HSE.zone 火灾事故调查报告库 事故案例主库

ima 知识库全量抓取数据 | 原文为 MARKDOWN 转换文本
‹ 上一篇:04_火灾司法案例_part03.md
下一篇:06_境外及港澳台调查报告_part02.md ›

06_境外及港澳台调查报告_part05.md

分类:13_整合MD与总目录 / 2026 年份:— 大小:7,812.8 KB 知识库创建:2026-08-05 09:07:21 抓取时间:2026-10-22 08:31:37

06_境外及港澳台调查报告 · 整合分片 part05

本片含 46 份报告。

FD064482012_美国_Bayer CropScience Pesticide Waste 储罐 爆炸 - Bayer CropScience Pesticide Waste Tank Explosion__最终报告_2_2.pdf2012燃气/爆炸
FD064492012_美国_CSB_Chevron Richmond 炼油厂 火灾 - Chevron Richmond Refinery Fire__最终报告_2.pdf2012化工/石化
FD064502012_美国_Chevron Richmond 炼油厂 火灾 - Chevron Richmond Refinery Fire__最终报告.pdf2012化工/石化
FD064512012_美国_Chevron Richmond 炼油厂 火灾 - Chevron Richmond Refinery Fire__最终报告_3.pdf2012化工/石化
FD064522012_美国_Chevron Richmond 炼油厂 火灾 - Chevron Richmond Refinery Fire__最终报告_5.pdf2012化工/石化
FD064532012_美国_Chevron Richmond 炼油厂 火灾 - Chevron Richmond Refinery Fire__最终报告_6.pdf2012化工/石化
FD064542012_美国_final-investigation-report---chevron-refinery-and-fire.pdf2012
FD064552012_美国_tesoro-anacortes-refinery-fatal-explosion-and-fire.pdf2012
FD064562013_CSB_2013_West_Fertilizer_Company_Fire_and_Explosion_Investigation_Report.pdf2013
FD064582013_美国_West 肥料 爆炸 与 火灾 - West Fertilizer Explosion and Fire__最终报告.pdf2013燃气/爆炸
FD064592013_美国_West 肥料 爆炸 与 火灾 - West Fertilizer Explosion and Fire__最终报告_3.pdf2013燃气/爆炸
FD064602013_美国_West_肥料_爆炸_与火灾-_West_Fertilizer_Explosion_and_Fire__最终报告_2.pdf2013燃气/爆炸
FD064612013_美国_Williams_Olefins_工厂_爆炸_与火灾-_Williams_Olefins_Plant_Explosion_and_Fire__最终报告.pdf2013厂房/车间燃气/爆炸
FD064622013_美国_carbide-industries-fire-explosion.pdf2013
FD064632013_美国_donaldson-enterprises-inc-fatal-fireworks-disassembly-explosion-and-fire.pdf2013
FD064642013_美国_silver-eagle-refinery-flash-fire-and-explosion-and-catastrophic-pipe-explosion.pdf2013
FD064652014_美国_Chevron Richmond 炼油厂 火灾 - Chevron Richmond Refinery Fire__最终报告_4.pdf2014化工/石化
FD064662014_美国_DuPont La Porte 设施 有毒 化学品 泄漏 - DuPont La Porte Facility Toxic Chemical Release__最终报告_2.pdf2014化工/石化燃气/爆炸
FD064672014_美国_Macondo Blowout 与 爆炸 - Macondo Blowout and Explosion__最终报告_2.pdf2014燃气/爆炸
FD064682014_美国_Macondo Blowout 与 爆炸 - Macondo Blowout and Explosion__最终报告_3.pdf2014燃气/爆炸
FD064692014_美国_Tesoro_Martinez_Sulfuric_AcidSpill-_Tesoro_Martinez_Sulfuric_Acid_Spill__最终报告.pdf2014
FD064702014_美国_West 肥料 爆炸 与 火灾 - West Fertilizer Explosion and Fire__最终报告_5.pdf2014燃气/爆炸
FD064712014_美国_West 肥料 爆炸 与 火灾 - West Fertilizer Explosion and Fire__最终报告_6.pdf2014燃气/爆炸
FD064722014_美国_al-solutions-fatal-dust-explosion.pdf2014
FD064732014_美国_freedom-industries-chemical-release.pdf2014
FD064742015_US_CSB_ExxonMobil_Torrance_Refinery_ESP_Explosion_Investigation_Report.pdf2015
FD064752015_美国_CSB_DuPont_La_Porte有毒化学品泄漏_公开会议记录稿.pdf2015化工/石化燃气/爆炸
FD064762015_美国_CSB_DuPont_La_Porte有毒化学品泄漏_最终调查报告.pdf2015化工/石化燃气/爆炸
FD064772015_美国_Chevron_Richmond_炼油厂火灾-_Chevron_Richmond_Refinery_Fire__最终报告_2.pdf2015化工/石化
FD064782015_美国_DuPont La Porte 设施 有毒 化学品 泄漏 - DuPont La Porte Facility Toxic Chemical Release__最终报告.pdf2015化工/石化燃气/爆炸
FD064792015_美国_US Ink 火灾 - US Ink Fire__最终报告.pdf2015
FD064802015_美国_US Ink 火灾 - US Ink Fire__最终报告_2.pdf2015
FD064812015_美国_delaware-city-refining-company.pdf2015
FD064822015_美国_exxonmobil-torrance-refinery-explosion.pdf2015
FD064832015_美国_us-ink-fire.pdf2015
FD064842016_美国_AirGas_设施_Fatal爆炸-_AirGas_Facility_Fatal_Explosion__最终报告.pdf2016燃气/爆炸
FD064852016_美国_CSB_enterprise-pascagoula-gas-plant-explosion-and-fire.pdf2016
FD064862016_美国_Sunoco_Logistics_Partners_闪燃火灾-_Sunoco_Logistics_Partners_Flash_Fire__最终报告.pdf2016
FD064872016_美国_West 肥料 爆炸 与 火灾 - West Fertilizer Explosion and Fire__最终报告_4.pdf2016燃气/爆炸
FD064882016_美国_exxonmobil-baton-rouge-refinery-chemical-release-and-fire.pdf2016
FD064892017_美国_CSB_Didion_Milling粉尘爆炸与火灾_最终调查报告.pdf2017燃气/爆炸
FD064902017_美国_CSB_Didion_Milling粉尘爆炸与火灾_结构性能与倒塌分析附录.pdf2017燃气/爆炸
FD064912017_美国_CSB_loy-lange-box-company-pressure-vessel-explosion.pdf2017
FD064922017_美国_Didion Milling 公司 爆炸 与 火灾 - Didion Milling Company Explosion and Fire__最终报告.pdf2017燃气/爆炸
FD064932017_美国_Didion Milling 公司 爆炸 与 火灾 - Didion Milling Company Explosion and Fire__最终报告_2.pdf2017燃气/爆炸
FD064942017_美国_Didion Milling 公司 爆炸 与 火灾 - Didion Milling Company Explosion and Fire__最终报告_2_2.pdf2017燃气/爆炸

FD06448 | 2012_美国_Bayer CropScience Pesticide Waste 储罐 爆炸 - Bayer CropScience Pesticide Waste Tank Explosion__最终报告_2_2.pdf

分类:06_境外及港澳台调查报告 | 年份:2012 | 地域: | 严重程度: | 场所: | 起火原因:燃气/爆炸 | 来源格式:pdf

DETAILS Distribution, posting, or copying of this PDF is strictly prohibited without written permission of the National Academies Press. (Request Permission) Unless otherwise indicated, all materials in this PDF are copyrighted by the National Academy of Sciences. Copyright © National Academy of Sciences. All rights reserved. THE NATIONAL ACADEMIES PRESS Visit the National Academies Press at NAP.edu and login or register to get: – Access to free PDF downloads of thousands of scientific reports – 10% off the price of print titles – Email or social media notifications of new titles related to your interests – Special offers and discounts   GET THIS BOOK FIND RELATED TITLES This PDF is available at SHARE CONTRIBUTORS     SUGGESTED CITATION http://nap.edu/13385 The Use and Storage of Methyl Isocyanate (MIC) at Bayer CropScience (2012)

218 pages | 6 x 9 | HARDBACK

ISBN 978-0-309-38723-1 | DOI 10.17226/13385 Committee on Inherently Safer Chemical Processes: The Use of Methyl Isocyanate (MIC) at Bayer CropScience; Board on Chemical Sciences and Technology; Division on Earth and Life Studies; National Research Council National Research Council 2012. The Use and Storage of Methyl Isocyanate (MIC) at Bayer CropScience. Washington, DC: The National Academies Press. https://doi.org/10.17226/13385.

The Use and Storage of Methyl Isocyanate (MIC) at Bayer CropScience Copyright National Academy of Sciences. All rights reserved. Committee on Inherently Safer Chemical Processes: The Use of Methyl Isocyanate (MIC) at Bayer CropScience Board on Chemical Sciences and Technology Division on Earth and Life Studies THE NATIONAL ACADEMIES PRESS Washington, D.C. www.nap.edu

The Use and Storage of Methyl Isocyanate (MIC) at Bayer CropScience Copyright National Academy of Sciences. All rights reserved. THE NATIONAL ACADEMIES PRESS   500 Fifth Street, NW   Washington, DC 20001 NOTICE: The project that is the subject of this report was approved by the Governing Board of the National Research Council, whose members are drawn from the councils of the National Academy of Sciences, the National Academy of Engineering, and the Institute of Medicine. The members of the committee responsible for the report were chosen for their special competences and with regard for appropriate balance. This study was supported by the Chemical Safety and Hazard Investigation Board under Award No: TPD-CSB-1O-C-OOO1. Any opinions, findings, conclusions, or recommendations expressed in this publication are those of the authors and do not necessarily reflect the views of the organizations or agencies that provided support for the project. International Standard Book Number 13:  978-0-309-25543-1 International Standard Book Number 10:  0-309-25543-0 Cover image: Bayer CropScience. Additional copies of this report are available from the National Academies Press, 500 Fifth Street, NW, Keck 360, Washington, DC 20001; (800) 624-6242 or (202) 334-3313; http:// www.nap.edu. Copyright 2012 by the National Academy of Sciences. All rights reserved. Printed in the United States of America.

The Use and Storage of Methyl Isocyanate (MIC) at Bayer CropScience Copyright National Academy of Sciences. All rights reserved. The National Academy of Sciences is a private, nonprofit, self-perpetuating society of distinguished scholars engaged in scientific and engineering research, dedicated to the furtherance of science and technology and to their use for the general welfare. Upon the authority of the charter granted to it by the Congress in 1863, the Academy has a man- date that requires it to advise the federal government on scientific and technical matters. Dr. Ralph J. Cicerone is president of the National Academy of Sciences. The National Academy of Engineering was established in 1964, under the charter of the National Academy of Sciences, as a parallel organization of outstanding engineers. It is autonomous in its administration and in the selection of its members, sharing with the National Academy of Sciences the responsibility for advising the federal government. The National Academy of Engineering also sponsors engineering programs aimed at meeting national needs, encourages education and research, and recognizes the superior achievements of engineers. Dr. Charles M. Vest is president of the National Academy of Engineering. The Institute of Medicine was established in 1970 by the National Academy of Sciences to secure the services of eminent members of appropriate professions in the examina- tion of policy matters pertaining to the health of the public. The Institute acts under the responsibility given to the National Academy of Sciences by its congressional charter to be an adviser to the federal government and, upon its own initiative, to identify issues of medical care, research, and education. Dr. Harvey V. Fineberg is president of the Institute of Medicine. The National Research Council was organized by the National Academy of Sciences in 1916 to associate the broad community of science and technology with the Academy’s purposes of furthering knowledge and advising the federal government. Functioning in accordance with general policies determined by the Academy, the Council has become the principal operating agency of both the National Academy of Sciences and the National Academy of Engineering in providing services to the government, the public, and the scientific and engineering communities. The Council is administered jointly by both Academies and the Institute of Medicine. Dr. Ralph J. Cicerone and Dr. Charles M. Vest are chair and vice chair, respectively, of the National Research Council. www.national-academies.org

The Use and Storage of Methyl Isocyanate (MIC) at Bayer CropScience Copyright National Academy of Sciences. All rights reserved.

The Use and Storage of Methyl Isocyanate (MIC) at Bayer CropScience Copyright National Academy of Sciences. All rights reserved. COMMITTEE ON INHERENTLY SAFER CHEMICAL PROCESSES: THE USE OF METHYL ISOCYANATE (MIC) AT BAYER CROPSCIENCE Elsa Reichmanis (Chair), Georgia Institute of Technology Paul Amyotte, Dalhousie University Peter Beak, University of Illinois at Urbana-Champaign Michael L. P. Elliott, Georgia Institute of Technology Wayne B. Gray, Clark University Dennis C. Hendershot, Independent Consultant Andrea Kidd Taylor, Morgan State University Michael K. Lindell, Texas A&M University Jacqueline MacDonald Gibson, University of North Carolina at Chapel Hill Jeffery J. Siirola, Eastman Chemical Company (retired) John Sorensen, Oak Ridge National Laboratory (resigned from committee on 2/28/2011) National Research Council Staff Kathryn Hughes, Study Director Dorothy Zolandz, Director Jeffrey Jacobs, Director, Water Science and Technology Board Ericka McGowan, Program Officer (until April 2011) Sheena Siddiqui, Senior Program Associate Amanda Cline, Administrative Assistant Rachel Yancey, Senior Program Assistant v

The Use and Storage of Methyl Isocyanate (MIC) at Bayer CropScience Copyright National Academy of Sciences. All rights reserved. vi BOARD ON CHEMICAL SCIENCES AND TECHNOLOGY Pablo Debenedetti (Co-Chair), Princeton University C. Dale Poulter (Co-Chair), University of Utah, Salt Lake City Zhenan Bao, Stanford University Robert G. Bergman, University of California, Berkeley Henry E. Bryndza, E. I. du Pont de Nemours & Company Emily Carter, Princeton University David Christianson, University of Pennsylvania Mary Jane Hagenson, Chevron Phillips Chemical Company LLC Carol J. Henry, The George Washington University Jill Hruby, Sandia National Laboratories Michael Kerby, ExxonMobil Chemical Charles E. Kolb, Aerodyne Research, Inc. Josef Michl, University of Colorado, Boulder Sander G. Mills, Merck, Sharp, & Dohme Corporation David Morse, Corning Inc. Robert E. Roberts, Institute for Defense Analyses Darlene J. Solomon, Agilent Technologies Jean Tom, Bristol-Myers Squibb David Walt, Tufts University National Research Council Staff Dorothy Zolandz, Director Kathryn Hughes, Program Officer Tina M. Masciangioli, Senior Program Officer Douglas Friedman, Program Officer Amanda Cline, Administrative Assistant Sheena Siddiqui, Senior Program Associate Rachel Yancey, Senior Program Assistant

The Use and Storage of Methyl Isocyanate (MIC) at Bayer CropScience Copyright National Academy of Sciences. All rights reserved. vii The Committee on Inherently Safer Chemical Processes: The Use of Methyl Isocyanate (MIC) At Bayer CropScience would like to thank the many technical, chemical, and engineering experts who contributed to the integrity of this report through the submission of informative materials and attendance of committee meetings. The committee would like to acknowledge Amy McCormick and Lucy Sciallo-Tyler of the U.S. Chemical Safety and Hazard Investigation Board; Steven Smythe, Patrick Ragan, Connie Stewart, Cindi Lester, Walter Martin, and the staff of the Bayer CropScience facility in Institute, West Virginia; Scott Berger, Center for Chemical Process Safety; Randall Sawyer, Contra Costa County; George Famini and George Emmett, Department of Homeland Security Analysis Center; John Carberry, Carberry EnviroTech; Matthew Blackwood and Larry Zuspan, Kanawha Putman Emergency Planning Committee; Craig Mattheisson, U.S. Environmental Protection Agency; and Warren Woomer of Charleston, South Carolina. We would also like to thank West Virginia State University in Institute, West Virginia for hosting the committee members and National Research Council staff for an open public comment session. Our thanks to all those who participated in the comment periods and who contributed information in support of the com- mittee’s data-gathering efforts. Acknowledgments

The Use and Storage of Methyl Isocyanate (MIC) at Bayer CropScience Copyright National Academy of Sciences. All rights reserved.

The Use and Storage of Methyl Isocyanate (MIC) at Bayer CropScience Copyright National Academy of Sciences. All rights reserved. This report has been reviewed in draft form by persons chosen for their diverse perspectives and technical expertise in accordance with procedures approved by the National Research Council’s Report Review Committee. The purpose of this independent review is to provide candid and critical comments that will assist the institution in making the published report as sound as possible and to ensure that it meets institutional standards of objectivity, evidence, and responsiveness to the study charge. The review comments and draft manuscript remain confidential to protect the integrity of the deliberative process. We wish to thank the following for their review of this report: Daniel A. Crowl, Michigan Technological University Chau-Chyun Chen, AspenTech Martin Sherwin, W.R. Grace & Company, Retired John Sawyer, MATRIC Research Michael Wright, United Steel, Paper and Forestry, Rubber, Manufacturing, Energy, Allied Industrial and Service Workers International Union (United Steelworkers) Scott Farrow, UMBC Gail Bingham, RESOLVE Ned Heindel, Lehigh University Michael R. Hoffman, California Institute of Technology Pam Nixon, West Virginia Department of Environmental Protection May Berenbaum, University of Illinois at Urbana-Champaign John H. Sorensen, Oak Ridge National Laboratory (retired) ix Acknowledgment of Reviewers

The Use and Storage of Methyl Isocyanate (MIC) at Bayer CropScience Copyright National Academy of Sciences. All rights reserved. x PREFACE Although the reviewers listed above provided many constructive comments and suggestions, they were not asked to endorse the conclusions or recom- mendations, nor did they see the final draft of the report before its release. The review of this report was overseen by David Bonner, Stematix, Inc. and W. Carl ­Lineberger, University of Colorado at Boulder. Appointed by the National Research Council, they were responsible for making certain that an independent examination of this report was carried out in accordance with institutional proce- dures and that all review comments were carefully considered. Responsibility for the final content of this report rests entirely with the authors and the institution. ACKNOWLEDGMENTS

The Use and Storage of Methyl Isocyanate (MIC) at Bayer CropScience Copyright National Academy of Sciences. All rights reserved. xi Contents Summary 1 Technical Summary 13 1 Introduction 21 2 Bhopal and Chemical Process Safety 31 3 Industrial Production and Use of MIC at Bayer CropScience 43 4 The Concepts of Inherently Safer Processes and Assessment 59 5 MIC and Pesticide Production at the Institute Plant: Alternatives Assessment 83 6 A Framework for Decision Making 113 7 Process Safety Management at Bayer CropScience 131 8 Post-incident Retrospective Process Assessment 141 Appendixes A Statement of Task 155 B Carbamate Pesticide and Methyl Isocyanate Timeline 157 C Emergency Response and Emergency Preparedness 173 D Policy Context of Inherently Safer Processes 179 E Meeting Agendas 191 F Biographies of Committee Members 195 G Acronyms 201

The Use and Storage of Methyl Isocyanate (MIC) at Bayer CropScience Copyright National Academy of Sciences. All rights reserved.

The Use and Storage of Methyl Isocyanate (MIC) at Bayer CropScience Copyright National Academy of Sciences. All rights reserved. The use of hazardous chemicals such as methyl isocyanate can be a significant concern to the residents of communities adjacent to chemical facilities, but is often an integral, necessary part of the chemical manufac- turing process. In order to ensure that chemical manufacturing takes place in a manner that is safe for workers, members of the local community, and the environment, the philosophy of inherently safer processing can be used to identify opportunities to eliminate or reduce the hazards associated with chemical processing. However, the concepts of inherently safer process analysis have not yet been adopted in all chemical manufacturing plants. This report presents a possible framework to help plant managers choose between alternative processing options—considering factors such as environ- mental impact and product yield as well as safety—to develop a chemical manufacturing system. In 2008, an explosion at the Bayer CropScience chemical production plant in Institute, West Virginia, resulted in the deaths of two employees, a fire within the produc­tion unit, and extensive damage to nearby structures. The accident drew renewed attention to the fact that the Bayer facility manufactured and stored methyl isocyanate, or MIC—a volatile, highly toxic chemical (see Box 1) used in the production of carbamate pesticides and the agent responsible for thou­sands of deaths in Bhopal, India, in 1984. In the Institute incident, debris from the blast hit the shield surrounding a MIC storage tank, and although the container was not damaged, an investigation by the U.S. Chemical Safety and Hazard Investigation Board found that the debris could have struck a relief valve vent pipe and caused the release of MIC to the atmosphere. The Board’s investigation also highlighted 1 Summary

The Use and Storage of Methyl Isocyanate (MIC) at Bayer CropScience Copyright National Academy of Sciences. All rights reserved. 2 USE AND STORAGE OF METHYL ISOCYANATE (MIC) AT BAYER CROPSCIENCE a number of weaknesses in the Bayer facility’s emergency response systems. In light of these concerns, the Board requested the National Research Council con- vene a committee of independent experts to write a report that examines the use and storage of MIC at the Bayer facility, and to evaluate the analyses on alterna- tive production methods for MIC and carbamate pesticides performed by Bayer and the previous owners of the facility. Following the 2008 accident, Bayer halted MIC production while complet- ing safety modifications, such as reducing onsite inventory of MIC and build- ing underground storage facilities. Then, in 2011—with the National Research ­Council study already underway—the Environmental Protection Agency cancelled registration of aldicarb, a carbamate pesticide known commercially as TEMIK that is produced using MIC. Shortly afterwards, Bayer announced that production of certain carbamate pesticides was no longer economically viable for the company and would cease at the end of 2012. In the meantime, Bayer intended to finalize modifications to the MIC plant at Institute and restart manufacturing of aldicarb, carbaryl (another carbamate pesticide known commercially as SEVIN), and the interme­diatematerials required for their production (including MIC) in mid 2012. In February 2011, amid concerns about the safety of restarting MIC process- ing at the Institute, West Virginia plant, a group of local residents filed suit against Bayer. On March 18, 2011, Bayer announced that it no longer intended to restart production of MIC. In a press release, the company stated that “uncertainty over delays has led the company to the conclusion that a restart of production can no longer be expected in time for the 2011 growing season” (see Box 2). In response to these developments, the National Research Council report’s authoring committee felt it necessary to change their approach to addressing the tasks they had been given. In particular, it became apparent that a full review of technologies for carbamate pesticide manufacture was less relevant, as the pesticides would no longer be produced at the Institute plant. In addition, it BOX 1 What Is MIC?

MIC (methyl isocyanate) is a volatile, colorless liquid that is extremely flammable, and potentially explosive when mixed with air. MIC reacts with water, giving off heat and producing methylamine and carbon dioxide. The liquid and vapor are toxic when inhaled, ingested, or exposed to the eyes or skin. The release of a cloud of MIC gas caused the Bhopal disaster in 1984, killing close to 3,800 people who lived near the Union Carbide India ­Limited plant in Bhopal, India.

The Use and Storage of Methyl Isocyanate (MIC) at Bayer CropScience Copyright National Academy of Sciences. All rights reserved. SUMMARY 3 became clear that a full analysis of manufacturing and energy costs would require greater time and resources than were available for the study. Instead, the com- mittee focused on a limited number of possible alternative production processes, presenting trade-offs with particular atten­tion to safety considerations. Because deciding between alternative processes requires consideration and weighing of a number of different factors, including safety, one possible framework for evaluat- ing these complex decisions is presented. MAKING THE USE OF HAZARDOUS CHEMICALS SAFER Within the chemical engineering community, the use of process safety ­management—a methodology for controlling hazards across a facility or orga- nization to reduce the frequency or consequences of an accident—is a standard practice required by the Occupational Safety and Health Administration. The goal of process safety is a systematic approach to safety that involves the pro- active identification, evaluation, mitigation, or prevention of chemical releases that might occur as a result of failures in the process, procedures, or equipment. Process Safety Management ensures that facilities consider multiple options for achieving a safe process, and carefully weigh the possible outcomes of each decision, and the Process Safety Management Standard, promulgated by the Occupational Safety and Health Administration in 1992, lists 14 mandatory elements—­ranging from employee training to process hazard analysis—to build- ing a chemical processing system. One approach for considering each of the options for safer processing is to consider a hierarchy of hazard control. The hierarchy contains four tiers: inher- ent, passive, active, and procedural, described below. Considering these possible hazard control methods in turn can help identify options for process design or modifications to improve process safety. Inherent: The inherent approach to hazard control is to minimize or elimi- nate the hazard, for example by replacing a flammable solvent with water to elim- BOX 2 MIC Storage and Use in the United States

The Bayer CropScience facility in Institute, West Virginia was the only site in the U.S. that stored large quantities of MIC. The chemical is generated during chemical manufacturing at another chemical facility in Texas, but at this facility the chemical is used up in the next stages of the reaction moments after being produced. MIC is still produced at several other chemical facilities worldwide.

The Use and Storage of Methyl Isocyanate (MIC) at Bayer CropScience Copyright National Academy of Sciences. All rights reserved. 4 USE AND STORAGE OF METHYL ISOCYANATE (MIC) AT BAYER CROPSCIENCE inate a fire hazard, rather than accepting the existence of hazards and designing safety systems to control them (see Box 3). There are four strategies to consider when making any chemical process inherently safer: • Substitute—Use materials, chemistry, or processes that are less hazardous. • Minimize—Use the smallest quantity of hazardous materials feasible for the process, reduce the size of equipment operating under hazardous conditions such as high temperature or pressure. • Moderate—Reduce hazards by dilution, refrigeration, or process alterna- tives which operate at less hazardous conditions reduce the potential impact of an accident by siting hazardous facilities in locations far from people or other property. • Simplify—Eliminate unnecessary complexity, and design “user-friendly” plants. Passive: Passive safety systems are those that control hazards with process or equipment design features without additional, active functioning of any device. For example, a containment dike around a hazardous material storage tank is a passive system to restrict a chemical spill to a limited area. Active: Active safety systems control hazards through systems that monitor and maintain specific conditions, or are triggered by a specific event. Examples of active systems include a sprinkler system that is triggered by smoke or heat. Procedural: Procedural safety systems control hazards through personnel education and manage­ment. Such systems include standard operating procedures, safety rules and procedures, operator training, emergency response procedures, and management systems. Only the inherent tier of process safety management invites consideration of the elimination or minimization of a given hazard; the other tiers are focused on control of an existing hazard. Although a valuable tool, consideration of inher- ently safer processes is not currently a required component of the Occupational Safety and Health Administration’s Process Safety Management Standard. See Box 4 for the alternative production methods considered by Bayer. Each possible approach presents its own costs and benefits. For example, a non-MIC- based process for production of aldicarb (option 2) means that there is no risk of worker exposure to MIC. However, some non-MIC-based processes could result in lower purity in the aldicarb, which could negatively affect the characteristics of the final commercial product. Just-in-time production of gaseous MIC product (which falls under option 3) would eliminate the risk of catastrophic release of that material within the community, but it would require a significant re-design

The Use and Storage of Methyl Isocyanate (MIC) at Bayer CropScience Copyright National Academy of Sciences. All rights reserved. SUMMARY 5 of the facility and would, in its current form, result in a final product with lower purity than the existing process. In evaluating the alternatives, considering costs and benefits such as risk, cost, quality of final product, and community perception, no one method out- performed all others in every category. The process ultimately chosen by Bayer poses higher risks to the surrounding community due to the volume of MIC stored at the facility, but it also considerably decreases the amount of wastewater gener- ated by the process, thereby reducing health risks to the community from damage to local surface water quality (see Box 5). IMPLEMENTING INHERENTLY SAFER PROCESS ASSESSMENTS Inherently safer process assessments can be valuable components of process safety management that can help a facility consider the full range of options in process design. However, inherently safer process assessments will not always result in a clear, well-defined, and feasible path forward. Although one pro- cess alternative may be inherently safer with respect to one hazard—toxicity of by-products, for example—the process may present other hazards, such as an increased risk of fire or more severe environmental impacts. Choosing between options for process design involves considering a series of tradeoffs and develop- ing appropriate combinations of inherent, passive, active, and procedural safety systems to manage all hazards. Some hazards will be best managed using inherent BOX 3 Emergency Preparedness and Inherently Safer Processes

Inherently safer processes can help reduce demands on emergency services. Specifically, applying the inherently safer principle of substitu­ tion reduces vulnerability if a chemical release occurred; minimization reduces the quantity of chemical available for release; and moderation decreases the temperature and pressure of release.

However, the implementation of inherently safer processes can some­ times transfer risk to new sites. For example, reducing the storage of hazardous chemicals at a chemical facility may make it necessary to increase the number of shipments of chemicals to the site to meet pro­ cess requirements, with the potential to increase the risk of a chemical release along the transportation route. While the emergency services in a community that houses a chemical processing facility would likely be prepared for the possibility of a chemical release, sites along the transportation route would likely have fewer resources to support an emergency response.

The Use and Storage of Methyl Isocyanate (MIC) at Bayer CropScience Copyright National Academy of Sciences. All rights reserved. 6 USE AND STORAGE OF METHYL ISOCYANATE (MIC) AT BAYER CROPSCIENCE methods, but others will inevitably remain and be effectively managed with other process safety management systems. Although the philosophy of inherently safer processes applies at all stages of processing, the available options and the feasibility of implementing them can change over the course of a technology’s life cycle. For this reason, it is easiest to implement inherently safer process design before process technologies have been chosen, facilities built, or customers have made commitments based on products with particular characteristics. As a product moves through its life cycle, these and other factors may limit options, make changes more difficult, or involve more people and organizations in the change. In order to build an inherently safer system, each stage of the process life cycle should be considered: Selection of basic technology: Identify inherently safer options for chemi- cal synthesis. Implementation of selected technology: How will the chosen process chemistry be imple­mented? Can hazardous operating conditions be minimized? Can impurities and by-products be avoided to eliminate purification steps? Plant design: Considerations include plant proximity to the surrounding population, in-plant occupied areas, sensitive environmental areas, and the gen- eral layout of equipment on the plant site. Detailed equipment design: Minimize the inventory of hazardous material in specific pieces of process equipment. Consider the impact of equipment layout on the length and size of piping containing hazardous materials. Consider human factors in the design of equipment to minimize the potential for incorrect opera- tion and human error. Operation: Use inherently safer processing principles in ongoing process safety management activities such as management of change, inci­dent investiga- tion, pre-startup safety reviews, operating procedures, and training to identify new opportunities for inherently safer processes. Challenges in Measuring Inherent Safety There are tools to measure the degree of inherent safety of a given process or processing alternative, but there is no current consensus on the most reliable metrics. Some metrics consider the likelihood of different hazards such as fire, explosion, or toxicity using penalty factors assigned based on the severity of the hazard to calculate an overall hazard index. However, the origin and justification of this relative scale is unclear, and these indexes are not designed to be adjusted

The Use and Storage of Methyl Isocyanate (MIC) at Bayer CropScience Copyright National Academy of Sciences. All rights reserved. SUMMARY 7 readily in order to reflect the variation in preferences among attributes or will- ingness to tolerate risk that different constituencies may exhibit. For example, a company owner may be willing to tolerate a small risk of a spill that could have health effects in the community if the alternative involved a much higher risk of a fire that would seriously damage the facility, whereas members of the commu­nity may not accept such a tradeoff, and employees of the firm (who place some value on keeping the facility intact in order to retain their jobs) might fall somewhere in between the owner and the community. Choosing Between Alternative Processes: A Framework for Decision Making Choosing between multiple process alternatives with conflicting trade-offs is a concern faced by any chemical processing facility. When no option is clearly favorable to the others, the question arises as to what decision-making framework a company could use to consider the trade-offs of process choices from an inher- ently safer perspective. Employing Decision in Inherent Safety Assessments As currently performed, a potential concern with using inherently safer pro- cess analysis is that it may become focused too narrowly, and as a consequence, may overlook certain outcomes. Even when multiple outcomes are recognized, they may be inappropri­ately weighted. For example, existing indexes for assess- ing inherently safer processes cannot capture the preferences of all decision ­makers, and the many trade-offs, uncertainties, and risk tolerances are hidden from view as implicit assumptions rather than explicit chosen parameters. One possible method for incorporating these preferences is to draw upon multi-criteria decision analyses, which use mathemat­ical constructs to assess and evaluate stakeholder input to play a role in developing weighted compari­sons between options. One example of decision theory analysis is multi-attribute utility (MAU) theory. This is not a new idea to the chemical community—in 1995, the Center for Chemical Process Safety (CCPS) published a book that suggested this and other decision aids could be used to support process safety assessments. However, though employed regularly in other sectors, these decision aids have yet to take hold in the chemical process industry. Key obstacles to their use include lack of familiarity with the tools among chemical process industry decision makers and the fear that the methods are either too simplistic or too costly to use. Nonethe- less, the report’s authoring committee found that decision analysis techniques could prove valuable for strengthening the integration of safety concerns into decision-­making in the chemical process industry. The use of these techniques could benefit not only the communities at risk from safety breaches, but also the

The Use and Storage of Methyl Isocyanate (MIC) at Bayer CropScience Copyright National Academy of Sciences. All rights reserved. 8 USE AND STORAGE OF METHYL ISOCYANATE (MIC) AT BAYER CROPSCIENCE BOX 4 Alternative Methods for Producing MIC and Carbamate Pesticides

The report’s authoring committee reviewed Bayer’s assessment of alternative processes for the manufacture of MIC and carbamate pesti­ cides and considered the alternatives and trade-offs. The alternative processes Bayer considered fall into the following broad categories:

  1. Continue with the current process
  2. Adopt an alternative process that does not involve MIC
  3. Use an alternative process for MIC production that would consume

MIC immediately, and therefore onsite storage of MIC would not be required

  1. Reduce the volume of stored MIC, and the risks associated with

transporting MIC from site to site, by re-arranging process equipment BOX 5 Inherently Safer Process Assessments at Bayer CropScience

Because the view of what constitutes an inherently safer process ­varies among professionals, the chemical industry lacks a common under­standing and set of practice protocols for identifying safer pro­ cesses. In its presentations to the report’s authoring committee, Bayer stated that inherently safer processing is an integral part of its process safety management strategy. However, the committee found that inherent safety considerations were not explicitly stated in Bayer’s process safety management records. Bayer performed hazard and safety assessments and made business decisions which resulted in MIC inventory reduction, elimination of aboveground MIC storage, and adoption of various passive, active, and procedural safety measures. However, these assessments did not explicitly incorporate the principles of minimization, substitution, mod­ eration, and simplification that are the basis of inherently safer processes.

Without an emphasis on incorporating inherently safer processes into process safety management, it is unlikely that these concepts would ­become part of corporate memory, and therefore they could be for­ gotten or ignored over time. It would be beneficial for Bayer to formally incorporate inherently safer process assessments into the company’s process safety management system and training, and to record such assessments as part of its audit review processes.

The Use and Storage of Methyl Isocyanate (MIC) at Bayer CropScience Copyright National Academy of Sciences. All rights reserved. SUMMARY 9 industries themselves, as decision-making techniques can help with the identi­ fication of profitable safety solutions that otherwise could be overlooked. A formal plan from the Chemical Safety Board or other appropriate entity for incorporating decision theory frameworks into inherently safer process assess- ments could help chemical facilities adopt inherently safer processes. A working group including experts in chemical engineering, inherently safer process design, decision sciences, and negotia­tion could identify obstacles and identify options for tailoring methods from the decision sciences to process safety assessments. POST-INCIDENT PROCESS ASSESSMENT Incident investigation is one of the mandatory elements of the Occupational Safety and Health Administration’s process safety management stan­dard. Com- prehensive protocols and advice are available for conducting investigations of chemical process incidents. These guidelines emphasize the need for a process safety management system to be simultaneously retrospective and prospective, with incident investigation providing the vital bridge between the lessons of the past and safer designs and operation in the future. Incorporating the principles of inherently safer processes into incident inves- tigations can help prevent future potential incidents that may have similar causes. Over time, findings from inherently safer process assessments performed in the wake of accidents may identify trends in process design that could be used to improve future systems. Findings from an investigation may also be of use when refining the models that support existing inherently safer process assessments. A post-accident inherently safer process assessment may also help identify unantici- pated hazards within a process, which could help inform the redesign or rebuild of the facility.

The Use and Storage of Methyl Isocyanate (MIC) at Bayer CropScience Copyright National Academy of Sciences. All rights reserved. 10 USE AND STORAGE OF METHYL ISOCYANATE (MIC) AT BAYER CROPSCIENCE BOX 6 Summary of Findings, Conclusions, and a Recommendation Process Safety Management and Inherently Safer Process Assessments at Bayer CropScience

Although claimed to be an integral PSM component, inherent safety considerations are incorporated into Bayer’s PSM efforts in an implicit manner that is dependent on the knowledge base of the individual facili­ tating the particular activity (e.g., process hazard analysis or PHA).

Bayer and its predecessors did seek to reduce risks associated with MIC, and those efforts did incorporate some aspects of risk reduction associated with ISP principles. However, Bayer did not make statements or provide documentation indicating that it had engaged in a systematic effort to incorporate ISP into the decision-making process.

Bayer and its predecessors evaluated trade-offs among the alterna­ tives, but while this analysis provides a very useful starting point for a comparison of technologies, it excludes factors that may be impor­ tant in the decision, from the perspective of both the company and the community.

Bayer CropScience did perform Process Safety assessments, how­ ever, Bayer and the legacy companies did not perform systematic and complete ISP assessments on the processes for manufacturing MIC or the carbamate pesticides at the Institute site. Bayer and the pre­ vious owners performed hazard and safety assessments and made business decisions that resulted in MIC inventory reduction, elimination of aboveground MIC storage, and adoption of various passive, active, and procedural safety measures. However, these assessments did not incorporate in an explicit and structured manner, the principles of mini­ mization, substitution, moderation, and simplification. The legacy owners identified possible alternative methods that could have resulted in a re­ duction in MIC production and inventory, but determined that limitations of technology, product purity, cost, and other issues prohibited their implementation.

The Use and Storage of Methyl Isocyanate (MIC) at Bayer CropScience Copyright National Academy of Sciences. All rights reserved. SUMMARY 11 Inherently Safer Process Assessments and Decision Making

Inherently safer process assessments can be a valuable component of process safety management. However, the view of what constitutes an inherently safer process varies among professionals, so the chemical industry lacks a common understanding and set of practice protocols for identifying safer processes.

Consistent application of ISP strategies by a company has the po­ tential to decrease the required scope of organizational emergency pre­ paredness programs by reducing the size of the vulnerable zones around its facilities. Such reductions are achieved by reducing the toxicity of the chemicals being used or produced, the quantity of the chemicals being stored, and the conditions under which they are being stored.

As currently performed, a potential concern with using ISP analysis is that it may become focused too narrowly, and as a consequence, may overlook certain outcomes. Even when multiple outcomes are recog­ nized, they may be inappropriately weighted.

The committee recommends that the Chemical Safety Board or other appropriate entity convene a working group to chart a plan for incorpo­ rating decision theory frameworks into ISP assessments. The working group should include experts in chemical engineering, ISP design, deci­ sion sciences, negotiations, and other relevant disciplines. The working group should identify obstacles to employing methods from the decision sciences in process safety assessments. It should identify options for tailoring these methods to the chemical process industry and incentives that would encourage their use. The Use of Inherently Safer Process Assessments in Post-Incident Investigations

The principles of ISP assessment can be used to good effect in con­ ducting an incident investigation when the objective is the prevention of potential incidents having similar fundamental, underlying (root) causes.

The Use and Storage of Methyl Isocyanate (MIC) at Bayer CropScience Copyright National Academy of Sciences. All rights reserved.

The Use and Storage of Methyl Isocyanate (MIC) at Bayer CropScience Copyright National Academy of Sciences. All rights reserved. Technical Summary In 2008, an explosion and fire at a chemical production plant owned by Bayer CropScience (Bayer) in Institute, West Virginia resulted in the deaths of two employees and renewed attention to the onsite manufacture and storage of methyl isocyanate (MIC). MIC is a highly toxic inhalation hazard, and a large release of the chemical in Bhopal, India in 1984 resulted in the immediate deaths of over 3,000 people. In Institute, MIC was manufactured and stored onsite begin- ning in 1966 for use in the production of carbamate pesticides. These pesticides, including aldicarb (Temik) and carbaryl (Sevin), have been or are used for both agricultural and residential control of pest insects. Although no part of the MIC production or storage processes at the Institute facility played a role in the 2008 incident, the U.S. Chemical Safety and Hazard Investigation Board (CSB) found during its investigation that debris from the explosion hit the shield surrounding an aboveground storage container of MIC. The Board determined that, had the debris followed a different path, a relief valve vent pipe on the tank could have been damaged, which could have resulted in a release of MIC to the atmosphere. The investigation also highlighted a number of weaknesses in the Bayer facility’s emergency response systems and restart pro- cedures within the affected production unit. In light of these concerns, Congress directed the CSB to consult with the National Academy of Sciences for a study to examine the use and storage of MIC at the Bayer CropScience facility. The statement of task was finalized after a public comment period held by the CSB, and it can be found in Appendix A. In brief, the task was divided into three parts: (1) review current industry practice for the use and storage of MIC, including consideration of the key lessons of the Bhopal incident; (2) review current technologies for producing 13

The Use and Storage of Methyl Isocyanate (MIC) at Bayer CropScience Copyright National Academy of Sciences. All rights reserved. 14 USE AND STORAGE OF METHYL ISOCYANATE (MIC) AT BAYER CROPSCIENCE carbamate pesticides; and (3) examine the use and storage of MIC at the Bayer CropScience facility in Institute, West Virginia. The third part of the task was the most complex, containing the following subparts: 3.1. Identify possible approaches for eliminating or reducing the use of MIC in the Bayer carbamate pesticide manufacturing processes; 3.2. Estimate the projected costs of alternative approaches identified above; 3.3. Evaluate the projected benefits of alternative approaches identified above; 3.4. Compare this analysis to the inherently safer process assessments con- ducted by Bayer and previous owners of the Institute site; and 3.5. Comment, if possible, on whether and how inherently safer process (ISP) assessments can be utilized during post-incident investigations. STUDY CONTEXT Data gathering and report preparation were performed during a period of legal activity and community concern related to the facility and its production of MIC. When the study began in September 2010, the CSB investigation was not yet complete, and Bayer had begun efforts to reduce onsite inventory of MIC, and a new underground storage facility was being built for MIC in light of that reduction. In August 2010, Bayer announced that, because of the U.S. Environmental Protection Agency’s decision to cancel registration of aldicarb, the company would cease production of aldicarb by late 2014. This decision was followed up in January 2011 by a decision to shut down production of MIC by 2012 and cease production of aldicarb and two other pesticides, methomyl and carbaryl. At the time, Bayer intended to restart production of MIC in February 2011, after the plant modifications were complete, to continue production until the 2012 end date. However, also in February, a group of local residents filed suit against the company citing concerns about the restart process and MIC storage and manufacture onsite. This resulted in a court order to halt the restart process pending an evidentiary hearing, although preparations in anticipation of restart were allowed to continue. The court process continued through the month of February, and on March 18, stating that, “uncertainty over delays has led the com- pany to the conclusion that a restart of production can no longer be expected in time for the 2011 growing season”,1 Bayer announced that it no longer intended to restart production of MIC or aldicarb. In addressing the statement of task, the committee began by considering how to address Task 3 and determining the data-gathering required. In addressing Task 3, the committee quickly determined that a detailed, full analysis of all alter- 1  Bayer. 2011. Bayer CropScience Announces Decision Not to Resume MIC Production. Bayer Press Release: March 18, 2001 [online]. Available: www.bayercropscience.com/bcsweb/crop protection.nsf/id/84634C20BB57C2D3C125785700503244.

The Use and Storage of Methyl Isocyanate (MIC) at Bayer CropScience Copyright National Academy of Sciences. All rights reserved. TECHNICAL SUMMARY 15 native chemistries available for the production of aldicarb and carbaryl, including their manufacturing and energy costs, would require significantly greater invest- ments than were available for the study. The investment required to fully analyze any one alternative is typically a multi-million dollar expenditure, and further, costs are highly dependent on the facility design, and accurate financial analysis requires specialized tools and information that is often unavailable to the public. In addition, in light of the de-registration of aldicarb and subsequent cessation of MIC, aldicarb, and carbaryl production at the Institute plant, the value of a full literature review for the chemical manufacturing community was reduced as the information available from such a review would have no longer have a potential use for the facility. With these limitations in mind, the committee chose to focus on a select set of possible alternative production processes for aldicarb and carbaryl. These ­chosen alternatives had been evaluated by Bayer and the facility’s legacy ­owners, and as a result, information about the chemistry and possible manufacturing processes were available for each. This approach reduced further the value that a literature review, which would be limited in its scope to information about manufacturing processes available in the open literature. As a result of these various factors, the committee chose to focus its efforts primarily on Task 3 and addressed Task 2 only in the context of the chosen alternative production processes. In this report, the selected alternatives and associated trade-offs are pre- sented, with particular attention to safety considerations. In addition, the context in which these trade-offs must be evaluated (financial, regulatory, etc.) is dis- cussed. Finally, because deciding between alternative processes requires con- sideration and weighing of a number of different factors, including safety, one possible framework for evaluating these complex decisions is presented. Within this summary, the committee’s findings, conclusions, and recommendation have been highlighted in bold text. They have also been aggregated in Box 6 at the end of the summary chapter. INHERENTLY SAFER PROCESS ASSESSMENTS AND PROCESS SAFETY MANAGEMENT Within the chemical engineering community, the use of process safety man- agement (PSM) systems is considered standard practice. PSM is a methodology composed of a number of different elements that, when evaluated as a whole, support organizational safety culture and practices. Although the “elements” or components of any given PSM system may vary somewhat between countries and organizations, the fundamental structures remain similar. Within the United States, Occupational Safety and Health Administration (OSHA) administers the Process Safety Management Standard, which has fourteen mandatory elements relating to, among other things, training, documentation, incident investigation, compliance audits, and process hazard analysis. Although companies are required

The Use and Storage of Methyl Isocyanate (MIC) at Bayer CropScience Copyright National Academy of Sciences. All rights reserved. 16 USE AND STORAGE OF METHYL ISOCYANATE (MIC) AT BAYER CROPSCIENCE to address those 14 elements, they are not limited to them. PSM is most effective at supporting a safe environment when it is contained within an overall organiza- tional structure that encourages a culture of safety among its employees. Within the element of process hazard analysis, employers are required to, “identify, evaluate, and control the hazards involved in the process” (29 CFR § 1910.119). To accomplish control of hazards, companies can consider a hierarchy of hazard control with the tiers of inherent, passive, active, and procedural con- trols. Only the inherent tier invites consideration of elimination or minimization of a given hazard; all other tiers are focused on control of an existing hazard. It is important to remember, however, that making a system inherently safer through, for example, substitution may result in a shift from one hazard or risk to another, and the full impact of any change on the overall hazard analysis should be considered as part of the decision-making process. The context in which an inherently safer process assessment is performed is important as this can affect the way that a given risk or hazard is weighted against another in the analysis. Although a valuable tool, consideration of ISPs is not a required component of OSHA’s PSM Standard. INHERENTLY SAFER PROCESS ASSESSMENTS AT BAYER CROPSCIENCE To address the task, a great deal of information was received from Bayer regarding the use and storage of MIC at the facility under their management and the management of the legacy companies, particularly Union Carbide and Rhône Poulenc. This information was examined in order to assess whether ISP assessment or its principles of substitute, minimize, moderate, and simplify were mentioned or evaluated within the analysis of different processes and synthetic routes. In addition, the role that ISP or its principles play in the PSM systems of Bayer and the legacy companies was evaluated. Although materials relating to the alternatives and their evaluation were provided to the committee for review in good faith, the documentation was rather disjointed and discontinuous, with doc- uments ranging from undated handwritten notes without attribution to in-depth type-written analyses of findings. The assessments presented here are drawn from these documents and from the academic and patent literature, and information gaps within the historic documents could result in gaps within these assessments. In the course of the study, Bayer presented the company’s approach to PSM, stating that ISP is an integral part of its PSM analysis. However, although claimed to be an integral PSM component, inherent safety considerations are incor- porated into Bayer’s PSM efforts in an implicit manner that is dependent on the knowledge base of the individual facilitating the particular activity (e.g., process hazard analysis or PHA). Although an implicit system of ISP incorpora- tion does not mean an absence of a commitment to inherent safety, it does mean that the commitment is not visible to the extent that might be considered desirable.

The Use and Storage of Methyl Isocyanate (MIC) at Bayer CropScience Copyright National Academy of Sciences. All rights reserved. TECHNICAL SUMMARY 17 A risk of this implicit approach is that the ISP components and principles do not become part of corporate memory, and this can lead to missed opportunities for incorporation of ISPs and design into the production facility. Over the course of the study, the committee reviewed documentation describ- ing the history of the plant and alternative assessments performed by Bayer and the legacy owners of the facility. The committee finds Bayer and its prede- cessors did seek to reduce risks associated with MIC, and those efforts did incorporate some aspects of risk reduction associated with ISP principles. However, Bayer did not make statements or provide documentation indicat- ing that it had engaged in a systematic effort to incorporate ISP into the decision-making process. Several decisions regarding process safety were made over the years by the owners of the Institute plant. Most of these decisions involved adding additional safety protections to existing processes, rather than changes to the underlying process. Bayer and its predecessors evaluated trade-offs among the alterna- tives, but while analysis provides a very useful starting point for a compari- son of technologies, it excludes factors that may be important in the decision, from the perspective of both the company and the community. The committee concludes that Bayer CropScience did perform process safety assessments; however, Bayer and the legacy companies did not per- form systematic and complete ISP assessments on the process for manufac- turing MIC or the processes used to manufacture pesticides at the Institute site. Bayer and the previous owners performed hazard and safety assess- ments and made business decisions that resulted in MIC inventory reduction, elimination of aboveground MIC storage, and adoption of various passive, active, and procedural safety measures. However, these assessments did not incorporate in an explicit and structured manner, the principles of minimiza- tion, substitution, moderation, and simplification. The legacy owners identi- fied possible alternative methods that could have resulted in a reduction in MIC production and inventory, but determined that limitations of technol- ogy, product purity, cost, and other issues prohibited their implementation. INHERENTLY SAFER PROCESS ASSESSMENTS Within the statement of task, the NRC was specifically asked to compare its analysis of alternative approaches for eliminating or reducing MIC “to the inher- ently safer process assessments conducted by Bayer and previous owners of the Institute site.” This required consideration of the industry’s current understanding of ISPs and assessments as well as the approaches used by Bayer and the legacy companies. Drawing upon the expertise within the committee membership as well as that of the publications from the Center for Chemical Process Safety, the Department of Homeland Security, and other material available in the literature, the following findings, conclusions, and recommendation were developed.

The Use and Storage of Methyl Isocyanate (MIC) at Bayer CropScience Copyright National Academy of Sciences. All rights reserved. 18 USE AND STORAGE OF METHYL ISOCYANATE (MIC) AT BAYER CROPSCIENCE Inherently safer process assessments can be a valuable component of process safety management. However, the view of what constitutes an ISP varies among professionals, so the chemical industry lacks a common under- standing and set of practice protocols for identifying safer processes. Experts in ISP agree on the components that define ISP, but that understanding has not yet become common among the rest of the professional community. Although the general concept of ISP has made it into the community, the specifics are not well known outside of the expert group. One particular barrier for use of ISP assess- ments that has been noted by expert chemical engineers is a lack of effective methods for analyzing risk-based trade-offs. ISP assessments can be challenging because of the interconnected nature of chemical manufacturing processes, e.g., care must, taken that a risk reduction in one process element does not result in an unexpected risk transfer to a different element. One possible approach for addressing this issue is the use of multi-attribute or -criteria decision analysis, which is described briefly in the next section. Note that ISP analysis has the potential to reduce the impact of incidents by addressing some common concerns in emergency preparedness and response. In many cases, for example, emergency response units will spend the majority of their training on appropriate response to the most common incident rather than the most catastrophic incident. This is not unexpected in light of funding con- straints and the difficulties posed in coordinating the multitier, multiorganization response required for training for large-scale incidents or releases. However, it is just these large-scale incidents that pose the greatest risk to emergency respond- ers. Consistent application of ISP strategies by a company has the potential to decrease the required scope of organizational emergency preparedness programs by reducing the size of the vulnerable zones around its facilities. Such reductions are achieved by reducing the toxicity of the chemicals being used or produced, the quantity of the chemicals being stored, and the condi- tions under which they are being stored. PRODUCTION OF MIC AND CARBAMATE PESTICIDES: ALTERNATIVES ASSESSMENT Four possible categories of alternatives for the manufacture of carbamate pesticides were considered: (1) continuing with the existing process, (2) adopt- ing an alternative chemical process not involving MIC, (3) using an alternative process for MIC production that would consume MIC immediately and thus not require storage, and (4) reducing the volume of stored MIC and the risks of transporting MIC from one facility within the site to another by rearrang- ing process equipment. Note that the task was not to determine the best course of action but to consider and compare these alternatives and the trade-offs posed by each option with respect to costs and benefits to the company and community.

The Use and Storage of Methyl Isocyanate (MIC) at Bayer CropScience Copyright National Academy of Sciences. All rights reserved. TECHNICAL SUMMARY 19 Each possible approach presents its own costs and benefits. For example, a non-MIC-based process for production of aldicarb means that there is no risk of worker exposure to MIC. However, that same non-MIC-based process could result in lower purity of the final material, which could result in greater risk of worker exposure to hazardous dust. Just-in-time production of MIC through a gaseous product would eliminate the risk of catastrophic release of that material within the community, but it would require a significant redesign of the facility and would, in its current form, result in a final product with lower purity than the existing process. In evaluating all of the alternatives, it became clear that no one method outperformed all others in every category of cost and benefit. The above paragraph highlights some of the technical costs and benefits, but when evaluating alternative approaches, nontechnical considerations should also be considered. One example of this is the perception of the choice by the sur- rounding community. The facility in Institute, West Virginia, as is true for many chemical manufacturing facilities, exists in close proximity to the surrounding community. In such situations, it is important to recognize the influence that local communities can have on corporate decision making, whether welcomed by the company or not. For example, the suit filed by some members of the local com- munity against Bayer played a role in the company’s decision to cease MIC and aldicarb production before the anticipated 2012 stop date. This is an example of how the perception of risk posed by the facility by the members of a surrounding community can affect whether a material or process is readily accepted, and the nature of the relationship between the community and the company may influence that risk perception. At a basic level, a neutral or positive relationship between a facility and its community allows for open discussion about risks and responses. It allows for a sense of trust that the experts on site are operating with care and consideration. A negative relationship can influence the community perception of risk, lead to distrust, and create an environment of defensiveness and lack of engagement on important issues relevant to everyone involved. The process ultimately chosen for the Institute site by the facility’s owners, although posing higher risks to the surrounding community due to the volume of MIC stored, decreases the amount of wastewater produced as compared with other methods and thus decreases potential damage to local surface waters. Deciding between multiple process alternatives with conflicting trade-offs is a concern faced by any company. It is clear that the development of a method that companies could use to weigh all of the trade-offs involved when consider- ing process choice from an inherently safer design perspective would be a useful tool for evaluating these concerns. A potential concern with using ISP analy- sis is that it may become focused too narrowly, and as a consequence, may overlook certain outcomes. Even when multiple outcomes are recognized, they may be inappropriately weighted. Both of these problems can result in a choice that does not reflect the optimal conclusion or the decision makers’ preferences.

The Use and Storage of Methyl Isocyanate (MIC) at Bayer CropScience Copyright National Academy of Sciences. All rights reserved. 20 USE AND STORAGE OF METHYL ISOCYANATE (MIC) AT BAYER CROPSCIENCE To assist the chemistry community in addressing the last of these findings, which as mentioned above has been noted as a barrier to performing inherently safer process assessments, the committee highlighted a method of decision analy- sis, multi-attribute utility (MAU) theory. This method was considered as an option for addressing appropriate weightings of multiple outcomes of an ISP analysis or assessment and to assist with placement of the findings of that analysis within the context of a full analysis of all costs and benefits associated with a process. MAU theory provides one possible framework for incorporating input and relative weightings from multiple perspectives and stakeholders, and as such, could be an aid for decision making. As a result, the committee recommends that the U.S. Chemical Safety Board and Hazard Investigation Board or other appropri- ate entity convene a working group to chart a plan for incorporating decision theory frameworks into ISP assessments. The working group should include experts in chemical engineering, ISP design, decision sciences, negotiations, and other relevant disciplines. The working group should identify obstacles to employing methods from the decision sciences in process safety assess- ments. It should identify options for tailoring these methods to the chemical process industry and incentives that would encourage their use. INCIDENT INVESTIGATION AND EMERGENCY RESPONSE In examining the potential utility of ISP assessments to incident investiga- tion, it becomes clear that the principles of ISP assessment can be used to good effect in conducting an incident investigation when the objective is the pre- vention of potential incidents having similar fundamental, underlying (root) causes. It is possible that over time, findings from ISP assessments performed in the wake of an accident could identify trends in process design that could be used to improve future systems. Findings from an investigation may be of use when refining the models that support existing ISP assessments. A post-incident ISP assessment may help identify unanticipated hazards within a given process that could inform the rebuild or redesign of the facility.

The Use and Storage of Methyl Isocyanate (MIC) at Bayer CropScience Copyright National Academy of Sciences. All rights reserved. 1 Introduction In August 2008, an explosion of a pressurized vessel, known as a residue treater, at the Bayer CropScience (Bayer) facility in Institute, West Virginia resulted in the deaths of two plant employees, a fire within the production unit, and extensive damage to nearby structures.1 Of particular relevance to this report, one of the structures hit by debris from the explosion was an aboveground 6,700-gallon storage tank of methyl isocyanate (MIC) protected by a steel “blast mat”. The tank was located approximately 70 feet from the site of the explosion and, at the time, contained approximately 6.8 tons of liquid MIC, a volatile, toxic chemical. The proximity of this tank to the explosion caused concern, given that a release of over 40 tons of MIC from a chemical facility in Bhopal, India in 1984 resulted in the immediate death of more than 3,000 people in the vicinity and additional mortality and morbidity of 100,000-200,000 individuals. (See Chapter 2 for more information.) During an investigation of the 2008 explosion in West Virginia by the U.S. Chemical Safety and Hazard Investigation Board (CSB), the proximity of the tank to the explosion and the protections surrounding it were given careful consider- ation. Although the MIC tank at the Bayer facility was protected from the heat and debris of the blast by the steel protective shield, the CSB determined from its investigation that “had the residue treater traveled unimpeded in the direction of the day tank and struck the shield structure just above the top of the MIC 1  A full discussion of the accident and its subsequent investigation by the United States Chemi- cal Safety and Hazard Investigation Board (CSB) can be found in the Board’s January 2011 report number 2008-08-I-WV, “Investigation Report: Pesticide Chemical Runaway Reaction Pressure Vessel Explosion (Two Killed, Eight Injured)”. 21

The Use and Storage of Methyl Isocyanate (MIC) at Bayer CropScience Copyright National Academy of Sciences. All rights reserved. 22 USE AND STORAGE OF METHYL ISOCYANATE (MIC) AT BAYER CROPSCIENCE day tank, the shield structure might have impacted the relief valve vent pipe. A puncture or tear in the vent pipe or MIC day tank head would have released MIC vapor into the atmosphere above the day tank.” (CSB, 2011) In 2009, while the investigation was still underway, John Bresland, Chairman of the CSB, stated in testimony before Congress, Although the MIC tank and the blast mat escaped serious damage on August 28, there is reason for concern. This was potentially a serious near miss, the ­results of which might have been catastrophic for workers, responders, and the public. . . . There are hypothetical scenarios where the MIC storage tank could have been compromised during the August 28 explosion, either by powerful projectiles or by a collision with the residue treater vessel, had it traveled in that direction. Any release of MIC into the atmosphere is cause for great concern.” (Bresland, 2009) As a result of this information and additional testimony provided at the hear- ing, the Chairman of the House Committee on Energy and Commerce, requested that the CSB (Waxman et al., 2009):

  1. ”Conduct an investigation to determine options for Bayer to reduce or

eliminate the use or storage of MIC at its West Virginia facility by switching to alternative chemicals or processes and the estimated cost of these alternatives;

  1. Determine whether Bayer has adequately examined the feasibility of

switching to alternative chemicals or processes;

  1. Provide in its final report specific recommendations for Bayer and its state

and federal regulators on how to reduce the dangers posed by onsite storage of MIC; and

  1. Brief our staff on the Board’s findings and recommendations at the end

of its investigation.” As a result of this request, the 111th Congress provided funds to the CSB “for a study by the National Academy of Sciences [NAS] to examine the use and storage of methyl isocyanate including the feasibility of implementing alternative chemicals or processes and an examination of the cost of alternatives at the Bayer CropScience facility in Institute, West Virginia” (H.R. Rep.No.111-316, 111st Cong., 1st Sess. [2009]). This report presents the findings and conclusions of the NRC study committee convened to perform this examination. STATEMENT OF TASK On August 26, 2009, Bayer announced in a press release (Bayer ­CropScience, 2009) that it would “reduce methyl isocyanate (MIC) storage by 80 percent” at the facility and eliminate aboveground storage of MIC. The company stated that it would cease production of MIC-based products within a year, and that it would

The Use and Storage of Methyl Isocyanate (MIC) at Bayer CropScience Copyright National Academy of Sciences. All rights reserved. INTRODUCTION 23 “continue to evaluate the feasibility of further measures, which may also include the use of alternative process technologies.” MIC production and primary storage occurred at the East Carbamoylation Center along with the manufacture of car- baryl and aldicarb. The aboveground MIC storage and production of methomyl, thiodicarb, carbosulfan, and carbofuran were in the West Carbamoylation Center. Everyday, MIC was transferred from the primary storage facility to the above­ ground day-use storage tank. By ceasing production of methomyl and ­carbofuran, Bayer was able to remove the need for the aboveground tank. This change allowed for reduction in storage capacity. In addition, a new MIC underground storage facility would be built in the East Carbamoylation Center to accommodate the change in production quantity. In April 2010, in response to the mandate from Congress and acknowledging the 80 percent reduction plan, the CSB issued a draft statement of task for the National Academies in the Federal Register and solicited public comment on the language. The National Academies began its work in early September 2010 under the finalized statement of task, which can be read in Box 1.1 and Appendix A. This report contains the consensus findings, conclusions, and recommendation developed in response to this task. DEVELOPMENTS IN WEST VIRGINIA A number of significant changes occurred at the Bayer facility during the course of the study. A timeline of the events can be found in Figure 1.1, and additional details are provided below. On August 16, 2010, prior to the National Research Council (NRC) begin- ning its work, Bayer announced that, as part of an agreement with the U.S. Environmental Protection Agency, it would voluntarily cancel the registration of aldicarb (Temik) for use in or on the remaining crops for which the pesticide was being used, including potatoes, citrus, cotton, and peanuts. As part of the phase- out agreement, farmers would be allowed to continue to use aldicarb on potatoes and citrus until the end of 2011. For all other crops, production would end by December 2014, distribution and sale of aldicarb would end by December 2016, and growers’ stocks should be exhausted by August 2018. Citing this agreement and global restructuring of its parent company, on January 11, 2011 Bayer announced that “the production of certain carbamates is no longer economically viable for Bayer CropScience.” (Bayer CropScience, 2011b) The company’s intention was to finalize the modifi- cations to the MIC plant at Institute; restart manufacturing of aldicarb, carbaryl, and the intermediate materials required for their production, including MIC; and continue manufacturing those materials until mid-2012. On January 20, 2011, the CSB released its report on the 2008 accident. Key findings from the investigation identified weaknesses in the following areas: the process hazard analysis, the pre-startup safety review, the startup procedures for

The Use and Storage of Methyl Isocyanate (MIC) at Bayer CropScience Copyright National Academy of Sciences. All rights reserved. 24 USE AND STORAGE OF METHYL ISOCYANATE (MIC) AT BAYER CROPSCIENCE BOX 1.1 Statement of Task for the Committee on the Use and Storage of Methyl Isocyanate (MIC) at Bayer CropScience

The National Research Council will produce a detailed written report, conclusions, and recommendations where appropriate on the following subjects:

Review the current industry practice for the use and storage of methyl isocyanate (MIC) in manufacturing processes, including a sum­ mary of key lessons and conclusions arising from the 1984 Bhopal ­accident and resulting changes adopted by industrial users of MIC.

Review current and emerging technologies for producing carba­ mate pesticides, including carbaryl, aldicarb, and related compounds. The review should include:

  1. 1. Synthetic methods and patent literature
  1. 2. Manufacturing approaches used worldwide for these materials
  1. 3. Manufacturing costs for different synthetic routes
  1. 4. Environmental and energy costs and trade-offs for alternative

approaches

  1. 5. Any specific fixed-facility accident or transportation risks asso­

ciated with alternative approaches

  1. 6. Regulatory outlook for the pesticides including their expected

lifetime on the market

facility in Institute, West Virginia: 3.1. Identify possible approaches for eliminating or reducing the use of MIC in the Bayer carbamate pesticide manufacturing pro­ cesses, through, for example, substitution of less hazardous interme­ diates, intensifying existing manufacturing processes, or consuming MIC simultaneously with its production.

  1. 2. Estimate the projected costs of alternative approaches identi­

fied above.

  1. 3. Evaluate the projected benefits of alternative approaches

identified above, including any cost savings, reduced compliance costs, liability reductions, reduced emergency preparedness costs, and ­reduced likelihood or severity of a worst-case MIC release or other release affecting the surrounding community.

  1. 4. Compare this analysis to the inherently safer process assess­

ments conducted by Bayer and previous owners of the Institute site.

  1. 5. Comment, if possible, on whether and how inherently safer pro­

cess assessments can be utilized during post-incident investigations.

The Use and Storage of Methyl Isocyanate (MIC) at Bayer CropScience Copyright National Academy of Sciences. All rights reserved.

25 FIGURE 1.1  Timeline of events. SOURCE: NRC Staff/Committee Generated

The Use and Storage of Methyl Isocyanate (MIC) at Bayer CropScience Copyright National Academy of Sciences. All rights reserved. 26 USE AND STORAGE OF METHYL ISOCYANATE (MIC) AT BAYER CROPSCIENCE the methomyl unit, the MIC day tank shield structure design, emergency planning and response, environmental monitoring, and regulatory oversight of the facility (CSB, 2011). The report provided an overview of the alternative MIC technolo- gies considered by Bayer and the plant’s previous owners. The CSB also noted in the report that the board was considering the impact of Bayer’s announcement to cease production of MIC on the NAS study. In the end, no changes were made to the NAS study or its statement of task as a result of the announcement. Bayer intended to restart production of MIC to support production of ­aldicarb in February 2011. On February 8, 2011, local residents filed suit against Bayer in order to halt the restart of production until certain criteria were met, which resulted in a temporary restraining order to halt the process to restart production of MIC at the Institute facility and scheduled an evidentiary hearing for February 25, 2011 (Case 2:11-cv-00087 Document 16). On February 12, Bayer requested clarification and cancellation of the judge’s order, citing a need to continue pre-startup work related to its “MIC Safety Enhancement Project.” The request noted activities such as completion of opera- tor training and drafting of standard operating procedures for the new systems as well as completion of activities to support compliance with recommendations made by the CSB and other federal and local organizations (Case 2:11-cv-00087 Document 24). The judge indicated that the company could continue its work on the safety system, but he also noted that, “The court finds it remarkable that the defendant has yet to complete a wide array of safety measures, in light of the announcement in open court that but for the [temporary restraining order], MIC would have been produced within seven days at the Institute facility. Indeed, the defendant’s counsel indicated that Bayer was ‘in the process of startup right now,’ and that Bayer was ‘commissioning equipment’” (Case 2:11-cv-00087 Document 26). As part of the court proceedings, M. Sam Mannan, a chemical engineering professor from Texas A&M University and recognized expert in chemical process safety, was appointed by the court as an independent expert to review the MIC production process at Bayer CropScience. Professor Mannan was accepted by both the plaintiffs and the defendants in the suit. Mannan’s report was delivered to the court on March 14. On the basis of his assessment of the facility and on evaluation of two possible release scenarios (a condenser tube springing a 5-mm leak and deliberate sabotage), Professor Mannan concluded that “the probabilis- tic risk of the MIC process is very low.” (Case 2:11-cv-00087 Document 92-4). Finally, on March 18, 2011, Bayer CropScience announced that it would not restart the production of MIC. In a press release, the company stated that, “uncertainty over delays has led the company to the conclusion that a restart of production can no longer be expected in time for the 2011 growing season” (Bayer CropScience, 2011a), and this resulted in a dismissal of the case. These events were occurring as the committee was holding its data-gathering sessions.

The Use and Storage of Methyl Isocyanate (MIC) at Bayer CropScience Copyright National Academy of Sciences. All rights reserved. INTRODUCTION 27 • Meeting 1: February 9-10, 2011, in Washington, DC. • Meeting 2: March 20-22, 2011, at West Virginia State University in Insti- tute, West Virginia. Included public comment period and a visit to the Bayer facility. • Meeting 3: May 24-25, 2011, in Washington, DC. • Meeting 4: August 8-9, 2011, in Woods Hole, Massachusetts. In addressing the statement of task, the committee began by considering how to address Task 3 and determining the data-gathering required. While it initially seemed that information from the literature review in Task 2 could be useful in addressing Task 3, the committee quickly determined that a detailed, full analysis of all alternative chemistries available for the production of aldicarb and ­carbaryl, including their manufacturing and energy costs, would require sig- nificantly greater investments than were available for the study. The investment required to fully analyze any one alternative is typically a multi-million dollar expenditure, and further, costs are highly dependent on the facility design, and accurate financial analysis requires specialized tools and information that is often unavailable to the public. In addition, in light of the de-registration of aldicarb and subsequent cessation of MIC, aldicarb, and carbaryl production at the Institute plant, the value of a full literature review for the chemical manufacturing com- munity was reduced as the information available from such a review would no longer have a potential use for the facility. With these limitations in mind, the committee chose to focus on a select set of possible alternative production processes for aldicarb and carbaryl. These ­chosen alternatives had been evaluated by Bayer and the facility’s legacy ­owners, and as a result, information about the chemistry and possible manufacturing processes were available for each. This approach reduced further the value of a literature review, which would be limited in its scope to information about manufacturing processes available in the open literature. As a result of these various factors, the committee chose to focus its efforts primarily on Task 3 and addressed Task 2 only in the context of the chosen alternative production processes. In this report, the selected alternatives and associated trade-offs are pre- sented, with particular attention to safety considerations. In addition, the con- text in which these trade-offs must be evaluated (financial, regulatory, etc.) is discussed. Finally, as deciding between alternative processes requires consider- ation and weighing of a number of different factors, including safety, one pos- sible framework for evaluating these complex decisions is presented. Note that much of the information to perform the analysis of trade-offs was drawn from documentation provided by Bayer CropScience from the company’s archives and those of the previous owners of the facility. As many of these processes were in active use until very recently, much of the information was previously considered proprietary.

The Use and Storage of Methyl Isocyanate (MIC) at Bayer CropScience Copyright National Academy of Sciences. All rights reserved. 28 USE AND STORAGE OF METHYL ISOCYANATE (MIC) AT BAYER CROPSCIENCE STRUCTURE OF THE REPORT This report consists of eight chapters. Chapter 2 provides an overview of the incidents in Bhopal, India, which is called for in Task 1. Chapter 3 provides an overview of carbamate pesticides and their history in Institute, West Virginia and includes important information about changes in the plant design related to production of the pesticides and their precursors. Chapter 4 contains an introduction to Inherently Safer Processes (ISP) and ISP assessment and describes the role such concepts and assessment can play in process safety management. This background information is necessary context for the analysis provided for the remaining chapters. Chapter 5 addresses Tasks 3.1-3.3 by presenting an assessment of alternative methods for production of MIC, aldicarb, and carbaryl. The chapter also discusses the many factors that influence decision making in chemical manufacturing. This last point led the committee to consider a broader framework in which alterna- tives and trade-offs could be considered in corporate decision making. One pos- sible framework for decision making is discussed in Chapter 6. Chapter 7 compares the process analyses performed at the Institute facility by Bayer CropScience and the legacy owners as specifically called for in Task 3.4. Chapter 8 addresses Task 3.5 and considers the use of ISP assessments in post-incident investigations. After reading the findings from the CSB report, visiting the plant and talking with Bayer CropScience personnel, and listening to testimony from the public comment periods, it became clear that consideration of the context in which any ISP or process hazard assessment is performed is essential to allow for a complete analysis. To address this need, the discussions in Chapters 5 and 7 also touch on the role that an organizational safety culture plays in creating a safe operating environment and the broader context in which chemical plants operate, including local communities and policy concerns. REFERENCES Bayer CropScience. 2009. Bayer Crop Science Announces Investment of $25 Million for Institute Site. Bayer News Release: August 26, 2009 [online]. Available: http://www.bayerus.com/News/ NewsDetail.aspx?ID=586330BF-C83B-4EF3-93DBFF791373C7D7. Accessed: Feb. 14, 2012. Bayer CropScience. 2011a. Bayer CropScience to Reduce Operations in Institute, West Virginia, and Close Woodbine, Georgia, Site. News: January 11, 2011 [online]. Available: http://www.bayer cropscience.com/bcsweb/cropprotection.nsf/id/EN_20110111?open&l=EN&ccm=500020. Ac- cessed: Sept. 29, 2011. Bayer CropScience. 2011b. Bayer CropScience Announces Decision Not to Resume. News: March, 18, 2011 [online]. Available: http://www.press.bayer.com/baynews/baynews.nsf/id/Bayer-Crop Science-announces-decision-not-to-resume-MIC-production. Accessed: Sept. 29, 2011.

The Use and Storage of Methyl Isocyanate (MIC) at Bayer CropScience Copyright National Academy of Sciences. All rights reserved. INTRODUCTION 29 Bresland, J. S. 2009. Testimony of John S. Bresland, Chairman and Chief Executive Officer, U.S. Chemical Safety Board, Before the House of Representatives Committee on Energy and Com- merce, Subcommittee on Oversight and Investigations, Hearing on Secrecy in the Response to the Fatal Bayer Chemical Plant Explosion, 111th Congress, April 21, 2009 [online]. Available: http://www.csb.gov/assets/document/BreslandBayerCombinedTestimony.pdf. Accessed: Feb. 14, 2011. CSB (Chemical Safety Board). 2011. Investigation Report: Pesticide Chemical Runaway Reaction Pressure Vessel Explosion, Bayer CropScience, LP, Institute West Virginia, August 28, 2008. U.S. Chemical Safety and Hazard Investigation Board, Washington, DC [online]. Available: http://www.csb.gov/assets/document/Bayer_Report_Final.pdf. Accessed: Sept. 29, 2011. Waxman, H. A., J. D. Rockefeller, B. Stupak, and E. J Markey. 2009. Letter to John Bresland, Chairman and Chief Executive Officer, U.S. Chemical Safety and Hazard Investigation Board, Washington, DC, from Henry A. Waxman, Chairman, House Committee on Energy and Com- merce, John D. Rockefeller, Chairman, Senate Committee on Commerce, Science and Transpor- tation, Bart Stupak, Chairman House Committee on Energy and Commerce Subcommittee on Oversight and Investigations, and Edward J. Markey, Chairman, House Committee on Energy and Commerce Subcommittee on Energy and the Environment, Washington, DC, May 4, 2009 [online]. Available: http://democrats.energycommerce.house.gov/Press_111/20090504/bayer. pdf. Accessed: June 26, 2012.

The Use and Storage of Methyl Isocyanate (MIC) at Bayer CropScience Copyright National Academy of Sciences. All rights reserved.

The Use and Storage of Methyl Isocyanate (MIC) at Bayer CropScience Copyright National Academy of Sciences. All rights reserved. 2 Bhopal and Chemical Process Safety INTRODUCTION No discussion of inherent safety processes (ISPs), process safety manage- ment (PSM), and methyl isocyanate (MIC) is complete without a discussion of the history and legacy of the Bhopal incident and the lessons learned. In what has been described by many as the “world’s worst industrial disaster”, over 40 tons of MIC was released at a Union Carbide India Limited (UCIL) plant in Bhopal, India on December 2, 1984 (Dhara and Dhara, 2002; Broughton, 2005). Much has been written on the disaster, and this report does not endeavor to repeat or evaluate that work but rather to provide an overview of the event and a discussion of the key lessons of process safety learned from the disaster as necessary con- text for the report. Chapter 3 discusses the use of MIC at the Bayer CropScience ­facility in Institute, West Virginia. METHYL ISOCYANATE The UCIL facility in Bhopal, India was a manufacturing facility for carba- mate pesticides that had a design similar to the plant in Institute, West Virginia, and it had been manufacturing MIC on site since 1980. As an intermediate step to the production of these pesticides, the facility stored a large quantity of MIC on site, although it was not actively manufacturing the material at the time of the incident. MIC itself is a volatile, colorless liquid with a pungent odor. It is extremely flammable, potentially explosive when mixed with air, and reacts exo- thermically with water to form methylamine and carbon dioxide. The liquid and vapor are toxic when inhaled, ingested, and if eyes or skin are exposed. Its vapor 31

The Use and Storage of Methyl Isocyanate (MIC) at Bayer CropScience Copyright National Academy of Sciences. All rights reserved. 32 USE AND STORAGE OF METHYL ISOCYANATE (MIC) AT BAYER CROPSCIENCE pressure is high at 54 kPa at 20oC, its boiling point is 39oC, and the vapor ­density is greater than that of air, meaning that the liquid volatilizes readily and the vapor will stay near ground level. When stored, the liquid is kept between –10°C and 0°C in order to maintain a low vapor pressure and to prevent ­exothermic self-polymerization. THE BHOPAL DISASTER On the night of the incident, December 2, 1984, at 11:00 p.m. local time, while many of the Bhopal residents were asleep, it was reported that a plant operator noticed a small MIC gas leak and increased gas pressure inside a stor- age tank. This leak and pressure were due to water that had entered the storage vessel. At the time, critical refrigeration for the storage system had been moved to another area in the plant, and without refrigeration to slow the reaction of MIC with water, the temperature and pressure rapidly rose within the storage vessel. As the temperature rose, the MIC began to self-polymerize, adding to the heat and pressure. The vapor was first routed to a scrubber for the vent gas that should have neutralized at least some portion of the vapor, but this unit was not active.1 The vapor should then have passed to a flare tower to be destroyed, but the tower was out of service for maintenance because of pipe corrosion. Shortly after midnight, a safety valve opened, sending a MIC gas plume into the air (Broughton, 2005). An emergency water curtain intended to react with the MIC in case of such a release was not designed to manage a release of that scale and was also suffering from corrosion, which likely reduced its efficacy. More than 40 tons of MIC was released into the impoverished commu- nity that surrounded the facility. As the plume traveled through the area, the severe acute irritant effects caused residents living nearby to become disoriented and anxious. In their attempt to escape from the chemical, residents ran out of their homes directly into the gas cloud, which resulted in increased exposure to the chemical. Reportedly, close to 3,800 residents were killed immediately. ­Thousands more, with estimates of up to 100,000-200,000 people in and sur- rounding that community, have experienced significant morbidity and mortality, including being partially or totally disabled, and experiencing premature death (Andersson et al., 1990; Beckett, 1998; Hood, 2004; Broughton, 2005; Mishra et al., 2009). From reports on the event, it is clear that the Bhopal facility was operating with reduced safety standards and equipment. Specifically, the unavailability of the refrigeration, scrubber, flare tower, and water curtain, led Broughton (2005) to conclude that the Bhopal facility operated with “safety equipment and proce- 1  The caustic in the scrubber was warm the next morning, indicating that some of the MIC could have actually reacted with the system despite being offline, but it was not sufficient to control the release.

The Use and Storage of Methyl Isocyanate (MIC) at Bayer CropScience Copyright National Academy of Sciences. All rights reserved. BHOPAL AND CHEMICAL PROCESS SAFETY 33 dures well below the safety standards found at its sister plant in Institute, West Virginia”; and “the local government, although aware of some of the safety prob- lems”, was reluctant to enforce stronger safety and air pollution standards for fear of losing a large employer. Multiple reports on the incident (ICFTU-ICEF, 1985; Shrivastava, 1987; Broughton, 2005; Mannan, 2005) have identified root causes for the disaster that are tied to human and management factors in addition to the technical factors described above. Specific concerns include a lack of responsive- ness to safety concerns identified during inspections, poor management of change in response to new procedures, reduced staffing on site and high turnover among employees, and deficiencies in equipment maintenance and operation, including emergency equipment and procedures. RISKS ASSOCIATED WITH MIC The health risks of MIC exposure involve injuries to the ocular, respira- tory, gastrointestinal, reproductive, and nervous systems (Beckett, 1998; Dhara and Dhara, 2002; Broughton, 2005). Autopsies performed on 300 victims of the disaster showed lesions that were severely necrotized on the upper respiratory tract lining, the lung capillaries, alveoli, and bronchioles. In addition, the autopsies revealed edematous and enlarged lungs, hemorrhages, bronchopneumonia, and acute bronchiolitis (Dhara, 2000; Broughton, 2005). The acute health effects, par- ticularly those reported and observed in residents 0 to 6 months after the Bhopal disaster, were primarily injuries from the intensely irritating effect of MIC on the cornea and included severe ocular burning, persistent watery eyes, pain, ulcers, and photophobia. Lesions related to respiratory tract toxicity were seen in both the upper and lower respiratory tracts, and included chest pain and pulmonary distress, pneumonitis, pulmonary edema, and pneumothorax. Gastrointestinal problems included persistent diarrhea and persistent abdominal pain (Dhara and Dhara, 2002; Broughton, 2005). Genetic health effects included increased ­chromosomal abnormalities. Acute psychological health effects included ­neuroses, anxiety, and adjustment reactions; and acute neurobehavioral effects reported and observed were impaired audio and visual memory, psychomotor coordination, reasoning and spatial coordination (Broughton, 2005). Chronic and long-term health risks of MIC exposure, particularly 1 to 25 years after the Bhopal incident, also involved injuries to the ocular, respi- ratory, and other organ systems, including reports of long-term injuries to the reproductive and nervous systems. In published reviews and clinical studies of the health effects from exposure to MIC during the early and late recovery periods of the Bhopal incident, scientists reported persistent watering of the eyes, eyelid infections, corneal opacities, chronic conjunctivitis, tear secretion deficiency, and cataracts (Andersson et al., 1990; Dhara and Dhara, 2002; Broughton, 2005; Mishra et al., 2009). Decreased lung function, restrictive and obstructive airway disease, chest pain, dyspnea, wheezing, and allergic bronchoalveolitis were also

The Use and Storage of Methyl Isocyanate (MIC) at Bayer CropScience Copyright National Academy of Sciences. All rights reserved. 34 USE AND STORAGE OF METHYL ISOCYANATE (MIC) AT BAYER CROPSCIENCE identified as the chronic and long-term respiratory health symptoms related to MIC exposure (Andersson et al., 1990; Beckett, 1998; Dhara and Dhara, 2002; Broughton, 2005; Mishra et al., 2009). Long-term reproductive health risks include increased spontaneous abortions, increased perinatal and neonatal mortality, menstrual cycle alterations, decreased placental weights, and increased chromosomal alterations (Beckett et al., 1998, Dhara and Dhara 2002, Mishra et al., 2009). Neurological symptoms include depression, impaired associative learning, motor speed and precision, and muscle aches (Dhara and Dhara, 2002; Mishra et al., 2009). LESSONS FROM BHOPAL Process Safety Management Although equipment failures increased the severity of the Bhopal disaster, these failures and the poor emergency response to the incident are indicative of serious flaws in the management of the facility, and these flaws are considered a root cause of the incident. These factors will not be discussed in detail here as they have been the topic of many previous papers and reports (for example, Bowander et al., 1985; Shrivastava, 1987), but the recognition of these organizational and human factors concerns has contributed to the response of the chemical commu- nity described here. The incident served as a catalyst for the chemical industry, government, chemical engineers, professional organizations, and various stake- holders to develop and adopt stronger and improved standards and practices for chemical process safety. As described by one process safety expert: “A significant impact of Bhopal was to make everybody—corporate management, government, communities—aware of the potential magnitude of a chemical accident” (West et al., 2004). It is in this context that the widespread use and acceptance of the concept, “process safety,” and later, chemical process safety, was embraced and adopted as a standard practice in the industry. The heightened awareness resulted in new regulations for process safety; best-practices initiatives, such as ­Responsible Care;2 and an increased concern about the potential to export the risk as well as the benefits of technology to developing countries as the chemical industry expanded around the globe. The goal of process safety is to develop a systematic and comprehensive approach to safety that involves the proactive iden- tification, evaluation, and mitigation or prevention of chemical releases that might occur as a result of failures in the process, procedures, or equipment (Kletz, 1998). In 1990, two major developments in U.S. process safety occurred: the publication of a proposed standard from the Occupational Safety and Health 2  Responsible Care is a global program initiated by the Canadian Chemical Producers’ Associa- tion in 1985 as a voluntary, industry-driven program to support improvements in health, safety, and environmental practices in the chemical industry.

The Use and Storage of Methyl Isocyanate (MIC) at Bayer CropScience Copyright National Academy of Sciences. All rights reserved. BHOPAL AND CHEMICAL PROCESS SAFETY 35 Administration (OSHA), titled “Process Safety Management of Highly Haz- ardous Chemicals,” and the passage by the U.S. Congress of the Clean Air Act Amendments (CAAA) of 1990. The CAAA provided regulatory oversight of process safety in the chemical industry to OSHA and the U.S. Environmental Protection Agency (EPA). In particular, CAAA identified 14 minimum elements that the OSHA Process Safety Management Standard must require of employers (see Box 2.1). The final PSM standard was promulgated in 1992 by OSHA and is enforced by that office in coordination with EPA. The standard emphasizes the management of hazards through a comprehensive program that integrates management technologies, practices, and procedures and includes 14 mandatory elements that correlate to the CAAA requirements (see Box 2.2). Under CAAA, EPA has responsibilities relating to the prevention of accidental release, inven- tories of chemicals, and development of risk management plans (RMP), among other things. EPA, as directed by the CAAA, established its risk management program rule requiring companies that use toxic and flammable substances to develop and submit an RMP that must be revised and resubmitted every 5 years. A third major provision of the CAAA was the creation and establishment of the U.S. Chemical Safety and Hazard Investigation Board (CSB), an independent federal agency patterned after the National Transportation and Safety Board, to investigate major chemical accidents at fixed facilities (P.L. 101-549§ 304, 104 Stat. 2576 [1990]). The Bhopal disaster also resulted in changes from within the chemical engi- neering and chemical industry communities. The American Institute of Chemical Engineers (AIChE) launched a major initiative in February 1985 to improve and bring attention to the practices of process safety (Bollinger et al., 1996). AIChE focused on becoming a resource for information about process safety, providing training and education, advancing the state of the art in process safety, and pro- moting process safety as a key industry value. An AIChE task force was formed in March 1985, and its members proposed initial objectives to establish guidelines for hazard evaluation procedures; guidelines for bulk storage, handling, and trans- portation of toxic and/or reactive materials; and good plant operating procedures and training. As a result of these objectives, the AIChE Council officially approved the establishment of the Center for Chemical Process Safety (CCPS). The CCPS was fully established as a separate organization from AIChE in September 1985, with a director, part-time staff consultants in the industry, and close to 40 charter corporate members. In 1989, CCPS outlined 12 elements of process safety man- agement in its book Guidelines for Technical Management of Process Safety, and these have been serving as the foundation for process safety programs, standards and regulations throughout the chemical industry in the United States, and around the world (Mannan, 2005). These elements are listed in Box 2.3. In the chemical process industry, managing risks through the use and imple- mentation of these program elements of process safety management and the

The Use and Storage of Methyl Isocyanate (MIC) at Bayer CropScience Copyright National Academy of Sciences. All rights reserved. 36 USE AND STORAGE OF METHYL ISOCYANATE (MIC) AT BAYER CROPSCIENCE BOX 2.1 CAAA Process Safety Management Standard Requirements (P.L. 101-549§ 304, 104 Stat. 2576 [1990])   1. Develop and maintain written safety information identifying work­ place chemical and process hazards, equipment used in the pro­ cesses, and technology used in the processes;   2. Perform a workplace hazard assessment, including, as appro­ priate, identification of potential sources of accidental releases, identification of any previous release within the facility that had a potential for catastrophic consequences in the workplace, estima­ tion of workplace effects of a range of releases, and estimation of the health and safety effects of such a range on employees;   3. Consult with employees and their representatives on the develop­ ment and conduct of hazard assessments and the development of chemical accident prevention plans and provide access to these and other records required under the standard;   4. Establish a system to respond to the workplace hazard assessment findings, which shall address prevention, mitigation, and emergency responses;   5. Review periodically the workplace hazard assessment and ­response system;   6. Develop and implement written operating procedures for the chem­ ical processes, including procedures for each operating phase, operating limitations, and safety and health considerations; mandated requirements of OSHA and EPA generally assumes that the chemical hazard risk already exists and is accepted. The assumption is that once the risk is accepted, it does not go away. Unless the management system is actively moni- toring company operations and taking proactive approaches to correct potential problems, the opportunity for an unwanted event to occur will manifest. The “best practice” methods for managing risks are found in the elements and components of PSM, which are widely accepted and used worldwide. Community Right-to-Know Another important regulatory impact of the Bhopal disaster was the passage of the Emergency Planning and Community Right-to-Know Act (EPCRA, also

The Use and Storage of Methyl Isocyanate (MIC) at Bayer CropScience Copyright National Academy of Sciences. All rights reserved. BHOPAL AND CHEMICAL PROCESS SAFETY 37   7. Provide written safety and operating information for employees and employee training in operating procedures, by emphasizing hazards and safe practices that must be developed and made available;   8. Ensure contractors and contract employees are provided with appro­priate information and training;   9. Train and educate employees and contractors in emergency ­response procedures in a manner as comprehensive and effective as that required by the regulation promulgated pursuant to section 126(d) of the Superfund Amendments and Reauthorization Act;

Establish a quality assurance program to ensure that initial ­process-related equipment, maintenance materials, and spare parts are fabricated and installed consistent with design specifications;

Establish maintenance systems for critical process-related equip­ ment, including written procedures, employee training, appropriate inspections, and testing of such equipment to ensure ongoing mechanical integrity;

Conduct pre-startup safety reviews of all newly installed or modi­ fied equipment;

Establish and implement written procedures managing change to process chemicals, technology, equipment and facilities; and

Investigate every incident that results in or could have resulted in a major accident in the workplace, with any findings to be reviewed by operating personnel and modifications made, if appropriate. SOURCE: OSHA, 2000. known as SARA Title III because it is Title III of the Superfund Amendments and Reauthorization Act of 1986). This bill came about as a result of both the Bhopal disaster in 1984 and a release of aldicarb oxime that occurred at the Union Carbide plant in Institute, WV in 1985. The release in Institute resulted in the hospitalization of approximately 100 individuals, and occurred shortly after the re-start of production following a hiatus in response to the Bhopal release. EPCRA, managed by EPA, defines the community right-to-know obligations of government, industry, and Tribal authorities with respect to emergency response planning and hazardous and toxic chemicals in the area. The Act has three subtitles: Emergency Planning and Notification, Reporting Requirements, and General Provisions. Some important elements of the Act follow:

The Use and Storage of Methyl Isocyanate (MIC) at Bayer CropScience Copyright National Academy of Sciences. All rights reserved. 38 USE AND STORAGE OF METHYL ISOCYANATE (MIC) AT BAYER CROPSCIENCE BOX 2.2 Elements of OSHA’s Process Safety Management Standard • Process safety information. Employers must complete a compilation of written process safety information before conducting any process haz­ ard analysis required by the standard. Process safety information must include information on the hazards of the highly hazardous chemicals used or produced by the process, information on the technology of the process, and information on the equipment in the process. • Process hazard analysis. Employers must perform an initial process hazard analysis (hazard evaluation) on all processes covered by this standard. The process hazard analysis methodology selected must be appropriate to the complexity of the process and must identify, evaluate, and control the hazards involved in the process. • Operating procedures. Employers must develop and implement writ­ ten operating procedures, consistent with the process safety information, that provide clear instructions for safely conducting activities involved in each covered process. Activities to be covered include initial startup, ­normal operations, temporary operations, emergency shutdown, emer­ gency operations, normal shutdown, and startup following a turnaround, or after an emergency shutdown. • Employee participation. Employers must develop a written plan of action to implement the employee participation required by PSM. Under PSM, employers must consult with employees and their representatives on the conduct and development of process hazard analyses and on the development of the other elements of process management, and they must provide to employees and their representatives access to process hazard analyses and to all other information required to be developed by the standard. • Training. Each employee presently involved in operating a process or a newly assigned process must be trained in an overview of the process and in its operating procedures. The training must include emphasis on the specific safety and health hazards of the process, emergency opera­ tions including shutdown, and other safe work practices that apply to the employee’s job tasks. • Contractors. Contract employers involved in maintenance, repair, turnaround, major renovation or specialty work, on or near covered pro­ cesses are required to train their employees to safely perform their jobs. The contract employers must document that employees received and understood training, and assure that contract employees know about potential process hazards and the work-site employer’s emergency ac­ tion plan, assure that employees follow safety rules of the facility, and

The Use and Storage of Methyl Isocyanate (MIC) at Bayer CropScience Copyright National Academy of Sciences. All rights reserved. BHOPAL AND CHEMICAL PROCESS SAFETY 39 advise the work-site employer of hazards that contract work itself poses or hazards identified by contract employees.

The facility employer must obtain and evaluate information regarding the contract employer’s safety performance and programs. The employer also must inform contract employers of the known potential fire, explo­ sion, or toxic release hazards related to the contractor’s work and the process; explain to contract employers the applicable provisions of the emergency action plan; develop and implement safe work practices to control the presence, entrance, and exit of contract employers and contract employees in covered process areas; evaluate periodically the performance of contract employers in fulfilling their obligations; and main­ tain a contract employee injury and illness log related to the contractor’s work in the process areas. • Pre-startup safety review. A safety review is mandatory for new facili­ ties and significantly modified work sites to confirm that the construction and equipment of a process are in accordance with design specifications; to ensure that adequate safety, operating, maintenance and emergency procedures are in place; and to ensure that process operator training has been completed. Also, for new facilities, a process hazard analysis must be performed and recommendations resolved and implemented before startup. Modified facilities must meet management-of-change requirement. • Mechanical integrity. Employers must establish and implement written procedures to maintain the ongoing integrity of process equip­ ment, including pressure vessels, piping systems, relief and vent sys­ tems, emergency shutdown systems, controls, and pumps. Employees ­involved in maintaining the ongoing integrity of process equipment must be trained in an overview of that process and its hazards and trained in the procedures applicable to the employee’s job tasks. • Hot work. Hot work permits must be issued for hot work operations conducted on or near a covered process. • Management of change. Employers must establish and implement written procedures to manage changes (except for “replacements in kind”) to process chemicals, technology, equipment, and procedures, and change to facilities that affect a covered process. Employees and contract employees who operate a process and maintenance must be trained in the change prior to startup of the process or the affected part of the process. • Incident investigation. PSM requires the investigation of each inci­ dent that resulted in, or could reasonably have resulted in, a catastrophic release of a highly hazardous chemical in the workplace. The investiga­ tion must be initiated as promptly as possible, but not later than 48 hours continued

The Use and Storage of Methyl Isocyanate (MIC) at Bayer CropScience Copyright National Academy of Sciences. All rights reserved. 40 USE AND STORAGE OF METHYL ISOCYANATE (MIC) AT BAYER CROPSCIENCE following the incident. The investigation must be by a team consisting of at least one person knowledgeable in the process involved, including a contract employee if the incident involved the work of a contractor, and other persons with appropriate knowledge and experience to investigate and analyze the incident thoroughly. • Emergency planning and response. Requires employers to develop and implement an emergency action plan. The emergency action plan must include procedures for handling small releases. • Compliance audits. Employers must certify that they have evalu­ ated compliance with the provisions of PSM at least every three years to verify that the procedures and practices developed under the standard are adequate and are being followed. The compliance audit must be con­ ducted by at least one person knowledgeable in the process and a report of the findings of the audit must be developed and documented noting deficiencies that have been corrected. The two most recent compliance audit reports must be kept on file. • Trade secrets. Employers must make available all information neces­ sary to comply with PSM to those persons responsible for compiling the process safety information, those developing the process hazard analy­ sis, those responsible for developing the operating procedures, and those performing incident investigations, emergency planning and response, and compliance audits, without regard to the possible trade secret status of such information. The employer may require from those persons to enter into confidentiality agreements not to disclose the information. SOURCE: Adapted from OSHA (2000). BOX 2.2 Continued • the creation of local and state emergency planning committees (LEPC and SERC, respectively), • the requirement for plant operators to notify local and state officials in the event of a significant release of toxic materials, • the requirement for plant operators to report inventories of all onsite chemi- cals for which an MSDS exists to state and local officials and local fire departments, • the requirement for plant operators to submit a Toxic Release Inventory Form annually, and • the protection of “trade secrets” contingent on approval by the EPA. EPCRA, Responsible Care, and the continuing evolution of PSM systems

The Use and Storage of Methyl Isocyanate (MIC) at Bayer CropScience Copyright National Academy of Sciences. All rights reserved. BHOPAL AND CHEMICAL PROCESS SAFETY 41 are manifestations of another, less-well-defined legacy from Bhopal: the change in community and industry perceptions of hazardous and toxic materials and the risks they pose to personnel onsite and the local population surrounding chemical facilities. The effects of the MIC release in 1984 are still felt in Bhopal, India, and by the Dow Chemical Company, which purchased the facility from Union Carbide in 2001. Within Institute, WV, it would be naive to not recognize the impact the Bhopal release had, and continues to have, on the area, and it is clear that the release and its aftermath have affected local community relationships with the current and former owners of the facility. The nature of the relationships between a chemical company and its sur- rounding community and onsite personnel can and do influence the range of busi- ness decisions that a company can make. This relationship is discussed in greater detail in Chapters 6 and 7 in the context of external factors that affect decision- making. To emphasize the importance of these relationships, the committee notes here that in 1985, the DuPont facility in LaPorte, TX actually began onsite production, although not storage, of MIC. In describing the implementation of this process, Mr. John Carberry stated that its success was due in part to the site manager’s “long standing, strong, broad community and governmental relations” and because the company recognized that it needed to, “[m]anage community and governmental relations to insure a smooth acceptance of the new process” (Carberry, 2011). To address this need, DuPont pro-actively involved the com- munity in discussions about the change in procedures at multiple points during the decision-making process. This engagement with the community was credited with creating a relationship where objections could be voiced and addressed without community protest. BOX 2.3 12 Elements of Process Safety Management Defined by CCPS   1. Accountability: Objectives and Goals   2. Process Knowledge and Documentation   3. Process Safety Review Procedures for Capital Projects   4. Process Risk Management   5. Management of Change   6. Process and Equipment Integrity   7. Human Factors   8. Training and Performance   9. Incident Investigation

Company Standards, Codes and Regulations

Audits and Corrective Actions

Enhancement of Process Safety Knowledge

The Use and Storage of Methyl Isocyanate (MIC) at Bayer CropScience Copyright National Academy of Sciences. All rights reserved. 42 USE AND STORAGE OF METHYL ISOCYANATE (MIC) AT BAYER CROPSCIENCE REFERENCES Andersson, N., M. K. Ajwani, S. Mahashabde, M. K. Tiwari, M. K. Muir, V. Mehra, K. Ashiru, and C. D. Mackenzie. 1990. Delayed eye and other consequences from exposure to methyl isocyanate: 93% follow-up of exposed and unexposed cohorts in Bhopal. Br. J. Ind. Med. 47(8):553-558. Beckett, W. S. 1998. Persistent respiratory effects in survivors of the Bhopal disaster. Thorax 53(suppl. 2):S43-S46. Bollinger, R. E., D. G. Clark, R. M. Dowell, R. M. Ewbank, D. C. Henershot, W. K. Lutz, S. I. Meszaros, D. E. Park, and E. D. Wixom. 1996. Inherently Safer Chemical Processes: A Life Cycle Approach. New York: Center for Chemical Process Safety of American Institute of Chemical Engineers. Bowander, B., J. X. Kasperson, and R. E. Kasperson. 1985. “Avoiding Future Bhopals.” Environment. 27:6-13; 21-27. Broughton, E. 2005. The Bhopal disaster and its aftermath: A review. Environ. Health 4(1):6. Carberry, J. 2011.Transition to Just-in-time Production of MIC, February 9, 2011, Washington, DC. Dhara, V. R. 2000. Health effects of the Bhopal gas leak: A review. Pp. 15-67 in The Bhopal Gas Leak: Lessons from Studying the Impact of a Disaster in a Developing Nation. Ph.D. Disserta- tion, University of Massachusetts [online]. Available: https://webdrive.service.emory.edu/users/ vdhara/healtheffects/dissertation/ch2.pdf. Accessed: Sept. 27, 2011. Dhara, V. R., and R. Dhara. 2002. The Union Carbide disaster in Bhopal: A review of health effects. Arch. Environ. Health 57(5):391-404. FABIG (The Fire and Blast Information Group). 2009. Major Accidents: Bhopal [online]. Available: http://www.fabig.com/NR/rdonlyres/803AA0DA-87BF-4A60-AAD0-71D0842F3775/2603/ Bhopal.pdf. Accessed: Sept. 27, 2011. Fortun, K. 2001. P. 259 in Advocacy After Bhopal: Environmentalism, Disaster, New Global Orders. Chicago: University of Chicago Press. Hood, E. 2004. Lessons learned? Chemical plant safety since Bhopal. Environ. Health Perspect. 112(6):A352-A359. ICFTU-ICEF. 1985. The Report of the ICFTU-ICEF Mission to Study the Causes and Effects of the Methyl Isocyanate Gas Leak at the Union Carbide Pesticide Plant in Bhopal, India, on December 2-3-1984. Available: http://bhopal.bard.edu/resources/research.php?action=getfile&id=445521. Accessed: April 16, 2012. Kletz, T. A. 1998. Process Plants: A Handbook for Inherently Safer Design. Philadelphia, PA: Taylor & Francis. Mannan, S. (ed.). 2005. Lee’s Loss Prevention in the Process Industries, 3rd Edition. Oxford, UK: Elsevier Butterworth-Heinemann . Mishra, P. K., R. M. Smarth, N. Pathak, S. K. Jain, S. Banerjee, and K. K. Maudar. 2009. Bhopal gas tragedy: Review of clinical and experimental findings after 25 years. Int. J. Occup. Med. Environ. Health 22(3):193-202. OSHA (Occupational Safety and Health Administration). 2000. Process Safety Management. OSHA

  1. U.S. Department of Labor, Occupational Safety and Health Administration, Washington,

DC [online]. Available: http://www.osha.gov/Publications/osha3132.html. Accessed: Feb. 14, 2012. Public Law 101-549, title III, Sec. 304, Nov. 15, 1990, 104 Stat. 2576. Shrivastava, P. 1987. P. 184 in Bhopal: Anatomy of a Crisis. Cambridge, MA: Ballinger Publishing. West, A. S., D. Hendershot, J. F. Murphy, and R. Willey. 2004. Bhopal’s Impact on the Chemical Industry, Process Safety Progress 23(4):229-230.

The Use and Storage of Methyl Isocyanate (MIC) at Bayer CropScience Copyright National Academy of Sciences. All rights reserved. 3 Industrial Production and Use of MIC at Bayer CropScience The statement of task calls for an examination of the use and storage of methyl isocyanate (MIC) at the Bayer CropScience facility in Institute, West Virginia. This chapter provides an overview of the history of the plant, with a particular focus on processes relating to MIC and the pesticides it is used to synthesize. Alternative methods of producing these materials are presented in Chapter 5. HISTORY AND CHARACTERISTICS OF THE SITE The 460-acre, multitenant Institute Manufacturing Industrial Park is located 9 miles west of Charleston, West Virginia. The facility is on the Kanawha River to the south, abuts Route 25 and Interstate 64 to the north, and the West Virginia State University to the east. Transportation to and from the site is provided by barge, rail (located adjacent to the river), and truck. West Virginia State University is the oldest extant institution in the immedi- ate vicinity. Established in 1891 as a land grant college, the university enrolls 3,145 students on a 91-acre campus adjacent to the Institute industrial park (U.S. News, 2010). (See Figure 3.1) Originally home to the Wertz Field Airport, the site was converted to a synthetic rubber production plant by the U.S. Government Defense Corporation during World War II. Originally designed, built, and managed by the ­Carbide and Carbon Chemicals Corporation (a subsidiary of Union Carbide) and the U.S. ­Rubber Company, the facility has had a number of owners. Union ­Carbide Corporation (UCC) purchased the chemical manufacturing operations plant in 1947, which it used to produce a variety of chemicals including butanol, olefins, plasticizers, and acetic acid. The plant also produced some fungicides, although 43

The Use and Storage of Methyl Isocyanate (MIC) at Bayer CropScience Copyright National Academy of Sciences. All rights reserved. 44 USE AND STORAGE OF METHYL ISOCYANATE (MIC) AT BAYER CROPSCIENCE FIGURE 3.1  Google™ Earth satellite images of the facility at Institute, West Virginia and the surrounding area (accessed April 14, 2012). (a) The region around Institute, West Virginia (b) the Bayer CropScience facility and local area. SOURCE: Google Earth satellite image: ©Google 2012.

The Use and Storage of Methyl Isocyanate (MIC) at Bayer CropScience Copyright National Academy of Sciences. All rights reserved. INDUSTRIAL PRODUCTION AND USE OF MIC AT BAYER CROPSCIENCE 45 this was initially a small portion of the plant’s operations. In the 1960s, UCC expanded operations, including construction of facilities to produce ­carbamates and to allow for production of new synthetic intermediates for other companies (Woomer, 2000). Rhône-Poulenc purchased UCC’s agricultural division, including the Institute site, in 1986. In 2000, Aventis (formed by a merger of Rhône-Poulenc and AgrEvo) took over management of the facility. Finally, Bayer CropScience acquired the facility in 2002 (CSB, 2011). Bayer CropScience is a global provider of insecticides, herbicides, and fungicides. Independently operated within Bayer, AG, Bayer CropScience is headquartered in Germany. The company employs about 20,700 workers in over 120 countries (Bayer ­CropScience, 2011c). The U.S. headquarters are in Research Triangle Park, North Carolina. In 2008, the facility hosted seven tenants. Bayer CropScience owned and operated 9 of the 16 production units on the site. Two production units, owned by Adisseo and FMC Corporation, were also operated by Bayer. The remaining units were owned and operated by Dow Chemical, Catalyst Refiners, Reagent Chemical, and Praxair, respectively. Bayer employed approximately 85 percent of the 645 workers employed at the facility (CSB, 2011). HISTORY OF CARBAMATE INSECTICIDE MANUFACTURING The focus of production at the Bayer plant in 2008 was on carbamate pes- ticides, which have been shown to be effective against a variety of pests. The general structure of carbamate pesticides is R1NHCOOR2, where R represents alkyl or aryl groups. The facility in Institute manufactured a number of different carbamates over the years. The processes for manufacturing these materials have changed over time, some of which have implications for process safety. What follows here is a description of some of the major changes at the facility, and Appendix B contains a detailed timeline of modifications. The major carbamate products are summarized in Table 3.1. Carbamate pesticide production in Institute began in the 1960s with carbaryl. Carbaryl is a broad-spectrum pesticide and is used in a variety of commercial and residential settings for control of pests such as beetles, crickets, fleas, ticks, and moths (U.S. EPA, 2004). Production of MIC also began during that decade, although at that time it was only manufactured for use at other facilities and for sale to other companies rather than for use onsite. That changed in 1976 with the production of aldicarb in Institute. Aldicarb had previously been produced in Woodbine, Georgia, and although final formulation and packaging of the material continued at that site, synthesis of the pesticide was moved to Institute. While sharing basic carbamate chemistry with carbaryl, for reasons that are discussed in Chapter 5, production of aldicarb was carried out by a chemical pathway using phosgene and MIC. Aldicarb is primarily used to control nematodes and sucking insects in crops such as cotton, beans, and peanuts (U.S. EPA, 2010). The method for production of carbaryl was changed in 1978 from one that used naphthyl-

The Use and Storage of Methyl Isocyanate (MIC) at Bayer CropScience Copyright National Academy of Sciences. All rights reserved. 46 USE AND STORAGE OF METHYL ISOCYANATE (MIC) AT BAYER CROPSCIENCE TABLE 3.1  Trade Names and Structures of Pesticides Manufactured at the Bayer CropScience Facility Pesticide Trade Name Structure Carbaryl Sevin Aldicarb Temik Thiodicarb Larvin, CropStar Carbofuran Furadan Carbosulfan Marshal Methomyl CH3 S N CH3 O NH O CH3 chloroformate (NCF) as a starting material to one that used MIC. That year also saw the startup of a second, larger MIC unit to provide for the growing demand for aldicarb and changes to carbaryl production.1 In the early 1980s, carbamate 1  At that time, the facility shipped MIC around the world to customers in France, India, Brazil, and the United States, and to accommodate international demand, Union Carbide built a MIC unit in Bhopal in the late 1970s, with startup in 1980.

The Use and Storage of Methyl Isocyanate (MIC) at Bayer CropScience Copyright National Academy of Sciences. All rights reserved. INDUSTRIAL PRODUCTION AND USE OF MIC AT BAYER CROPSCIENCE 47 insecticide manufacturing was expanded to include methomyl (an intermediate feedstock sold internationally) and thiodicarb (an agricultural insecticide and ovicide used against cotton bollworms and budworms made from methomyl) (U.S. EPA, 1998), both of which required MIC for production. The MIC and phosgene production units, along with the units that were used to manufacture aldicarb and carbaryl, were all co-located in the East ­Carbamoylation Complex (ECC). Production units for methomyl and thiodicarb were located in the West Carbamoylation Complex (WCC). The ECC and WCC are highlighted in Figure 3.2. Liquid MIC was stored in underground refrigerated pressure vessels in the ECC where it was manufactured. It was later used as a chemical feedstock there or at the WCC to which it was transferred at night and stored for later use. On December 3, 1984, in response to the release in Bhopal, the MIC ­facility in Institute was shut down for several months while Union Carbide installed $5 million worth of safety equipment and enhancements (Los Angeles Times, 1985), which included increased MIC destruction capacity. However, the Institute site itself suffered an accident on August 11, 1985, FIGURE 3.2  The Bayer CropScience facility. The circle on the left marks the methomyl production unit, where the aboveground storage tank was located, in the West Carbamo- ylation Complex. The circle on the right marks the methyl isocyanate production unit in the East Carbamoylation Complex. SOURCE: Smythe, 2011.

The Use and Storage of Methyl Isocyanate (MIC) at Bayer CropScience Copyright National Academy of Sciences. All rights reserved. 48 USE AND STORAGE OF METHYL ISOCYANATE (MIC) AT BAYER CROPSCIENCE when 4,000 pounds of aldicarb oxime and methylene chloride were released, resulting in 136 people being sent to 5 local hospitals. No fatalities were reported, though 29 individuals were held for observation for one or more days (Houston Chronicle, 1985; Baron et al., 1988). Following Bhopal, shipments of MIC from Institute to U.S. customers were curtailed. Two of these customers were FMC, a manufacturer of the carba- mate pesticides carbofuran and carbosulfan and DuPont. In 1986, FMC built production units for carbosulfan and carbofuran in the WCC (Woomer, 2000). DuPont developed a process for manufacturing MIC as a feedstock that was almost instantaneously reacted into final product, thereby eliminating the need to purchase or store MIC. That same year, 1986, Rhône-Poulenc bought Union ­Carbide’s Agricultural Products Division. In 1993 a $50 million Institute modification project carried out various changes to the facility related to MIC, phosgene, and chlorine safety (Ward, 1994). As part of that project, MIC capacity was reduced by more than 80 percent to 22 million pounds per year. This change was largely justified as a consequence of DuPont and other customers no longer requiring the product, which had previ- ously been stored in batches of 240,000 pounds. Additional details about these changes can be found in Chapter 5. In 1999, Rhône-Poulenc purchased the carbofuran and carbosulfan manu- facturing facilities owned by FMC and established the Carbamate Excellence Center at Institute, and a new carbamate process, the oxamyl process, was added. In December of that year, Rhône-Poulenc SA merged with Hoechst AG to form Aventis. The Institute site became the largest site in North America for Aventis CropScience (Woomer, 2000). In 2001, EPA performed a series of inspections at the facility and identified a set of violations of environmental laws (EPA, 2009). Also in 2001, the facility was purchased by Bayer, thus moving the Institute plant to its current ownership, Bayer CropScience. As the legal successor to Aventis, Bayer settled with EPA regarding the 2001 violations in February 2009 with an agreement to pay a $112,500 penalty and to spend over $900,000 on supplemen- tal environmental projects. As part of the settlement, Bayer CropScience neither admitted nor denied the allegations. By 2008 the Institute plant was the only facility in the United States that manufactured, stored, and consumed large quantities of MIC. Liquid MIC was stored in underground refrigerated pressure vessels in the ECC, where it was manufactured before being used—either as a chemical feedstock there or at the WCC to which it was transferred at night and additionally stored. Each pressure vessel was insulated and had double-wall construction, with leak detection in the annulus between the inner and outer wall. The transfer from the ECC to the WCC occurred through a 2,500-foot, insulated, aboveground piping system to an aboveground “day tank” located on the southwest corner of the WCC. The stain- less steel tank, with a maximum capacity of 6,700 gallons, held approximately 37,000 pounds of MIC at its normal 75 percent operating capacity. A number of

The Use and Storage of Methyl Isocyanate (MIC) at Bayer CropScience Copyright National Academy of Sciences. All rights reserved. INDUSTRIAL PRODUCTION AND USE OF MIC AT BAYER CROPSCIENCE 49 safety features were incorporated into the day-tank design. The tank was filled once per day, and the pipes connecting the ECC to the WCC were purged after the transfer. The MIC was chilled, with methyl isobutyl ketone (MIBK) used as the chiller fluid because, unlike the water-ethylene glycol mixtures typically used in chillers, MIBK does not react with MIC and therefore poses less risk in case of a chiller leak. Fire suppressants were installed to prevent thermal reactions. Air monitors were in place to detect MIC leaks. Finally, the tank and top piping connections were surrounded with a blast blanket to prevent debris from striking the tank and to provide a thermal shield in case of fire (CSB, 2011). Each of the pesticides being manufactured onsite at Institute used different production processes: aldicarb was produced in a batch reactor, carbaryl in a continuous fixed-bed reactor, methomyl in a continuous plug flow reactor, and carbofuran used a solventless process. All of these processes were designed to use liquid MIC. The pesticides had different seasonal patterns of production, and there was considerable variation in the facility’s MIC consumption over time—between 5,000 and 100,000 pounds per day over the course of their history. To regulate car- bamate production and minimize startup/shutdown issues for MIC production, the facility maintained an inventory of up to 200,000 pounds of MIC—­approximately 10 days of normal production or 3 days of high production (Martin, 2011). On August 28, 2008, an uncontrolled chemical reaction inside a methomyl unit residue treater in the WCC caused the vessel to explode violently, causing the deaths of two employees. See the next chapter section (History of Emergency Preparedness and Accidents) for more information. As a result of the accident and the damage to the WCC, production of methomyl, MIC, and the carbamate-based pesticides ceased, pending investigation and evaluation of the production unit. In March 2009, EPA made a decision to ban the use of carbofuran pesticides (74 Fed.Reg.11,551 [2009]) leading to the decision by Bayer CropScience to stop production at Institute of all but two of the carbamate pesticides: aldicarb and carbaryl. Dropping the other products led to substantial reductions in the need for MIC, and so 2009 MIC production was only 9 million pounds, with planned 2010 production of 11.5 million pounds (Martin, 2011). In August 2009, Bayer announced a $25 million investment program “for further enhancing operational safety” (Bayer CropScience, 2009) at the facility, and as part of this program, the carbamate pesticide production would cease in the WCC approximately a year after the announcement. This would remove the need for the aboveground storage tank and for the transfer of MIC from the ECC to the WCC. Production would be limited to aldicarb and carbaryl, both of which were produced in the ECC. As part of the modification plan the decision was made to reduce by 80 per- cent the maximum amount of MIC being kept in storage on the Institute site, with additional passive and active safety systems on MIC production to mini- mize risks. Additional details will be provided in Chapter 5, but briefly, the MIC-production changes included building a new storage unit for the MIC with

The Use and Storage of Methyl Isocyanate (MIC) at Bayer CropScience Copyright National Academy of Sciences. All rights reserved. 50 USE AND STORAGE OF METHYL ISOCYANATE (MIC) AT BAYER CROPSCIENCE underground tanks; incorporation of a steam-ammonia curtain in the building’s perimeter to assist in controlling leaks, should they occur; and other passive and active safety controls. In 2010 Bayer reached an agreement with EPA to voluntarily cancel its registration of aldicarb, with production of the pesticide to end in 2014 and distribution and sales to end in 2016 (EPA, 2010; Ward, 2010). Citing this agree- ment and global restructuring of its parent company, on January 11, 2011 Bayer announced that “the production of certain carbamates is no longer economically viable.” (Bayer CropScience, 2011b) The company’s intention at that time was to continue to make modifications to the MIC plant at Institute; restart manufactur- ing of aldicarb, carbaryl, and the intermediate materials required for their produc- tion, including MIC; and continue manufacturing those materials until mid-2012. In February 2011 a group of Kanawha Valley residents filed suit to stop Bayer CropScience from restarting its production of MIC at the Institute plant until EPA and OSHA completed comprehensive plant inspections. A prelimi- nary injunction was granted, halting Bayer’s planned restart of MIC production (Ward, 2011). On March 18, 2011, Bayer CropScience announced that it would not restart the production of MIC. In a press release, the company stated that, “uncertainty over delays has led the company to the conclusion that a restart of production can no longer be expected in time for the 2011 growing season.” In light of this decision, the company said it would proceed with decommission- ing the MIC and carbamate production units at Institute, as well as closing the Woodbine facility, which had continued to finalize the aldicarb formulation and packaging since 1976 (Bayer CropScience, 2011a). HISTORY OF EMERGENCY PREPAREDNESS AND ACCIDENTS The Kanawha River Valley is the home of an extensive network of chemical and other manufacturing facilities and represents one of the highest concentra- tions of such industries in the United States. In 1954, these industries established the Kanawha Valley Emergency Planning Committee (KVEPC) following an explosion of an acrolein tank car. An explosion of an ethylene oxide distillation column in 1955 damaged parts of the Institute facility and led to a major safety review by the management (Woomer, 2000). After that, such safety reviews were conducted internally to the plant and its management until the Bhopal accident. Following Bhopal, public concern in the Kanawha Valley about chemical acci- dents increased, and with passage of the Emergency Planning and Community Right-to-Know Act (EPCRA, see Chapter 2), the Kanawha/Putnam Local Emer- gency Planning Committee (KPEPC) was established in 1987 (KPEPC, 2011). At the same time, local public concern about MIC led to the establishment of the organization People Concerned About MIC (PCMIC, 2011). In 1992, the KPEPC initiated the Kanawha Valley Hazard Assessment ­Project, which examined “worst-case” scenarios for all chemical plants in the ­valley. The

The Use and Storage of Methyl Isocyanate (MIC) at Bayer CropScience Copyright National Academy of Sciences. All rights reserved. INDUSTRIAL PRODUCTION AND USE OF MIC AT BAYER CROPSCIENCE 51 compilation of scenarios were presented during a June 3-4, 1994 workshop held in Charleston, West Virginia under the title “Safety Street: ­Managing Our Risk Together (Worst Case Scenario Presentations).” This was the first time such an activity had been held in the area, and according to the organizers, it was well received by the community (OECD, 1997). The materials identified a release from the MIC unit as one of worst-case scenarios associated with the Rhône- Poulenc-owned facility; the other two noted chemicals associated with the facility were phosgene and chlorine, the latter being used in the production of phosgene. The risk management plan from Rhône-Poulenc identified the worst case as the full release of 253,600 pounds of MIC from the ECC belowground storage tank. According to the analysis, such a release would exceed ERPG-2 (emergency response planning guidelines) levels out to a distance of 28 miles (at concentra- tion of 0.5 ppm) and ERPG-3 levels out to a distance of 9 miles (5 ppm) (Fortun, 2001, pp. 66-67). ERPG-2 levels indicate the “maximum airborne concentration below which it is believed that nearly all individuals could be exposed for up to 1 hour without experiencing or developing irreversible or serious health effects or symptoms which could impair an individual’s ability to take protective action”2, while ERPG-3 levels indicate the “maximum airborne concentration below which it is believed that nearly all individuals could be exposed for up to 1 hour with- out experiencing or developing life-threatening health effects”.3 This constitutes the largest scenario vulnerability zone of any chemical used in the ­valley at the ERPG-2 level and nearly largest vulnerability zone at the ERPG-3 level. At the time of the 1992 analysis, Rhône-Poulenc had just completed a 1.5- year study called Project Michelle (1989-1990) (as cited in Ward, 1994) which focused on improving the safety of thee MIC processes, including considering whether to put a “bubble” over the entire MIC unit to contain any leaks. Rhône- Poulenc had numerous active (and some passive) systems in place to reduce the risk associated with the MIC unit. These included:

  1. Process design. An emergency dump tank for safe transfer of MIC from

a leaking vessel, a scrubber to destroy MIC in the storage tank, a flare tower to destroy MIC from process vents, backup control room instruments, automatic MIC isolation valves to stop leaks, diking and spill collection sumps, a fire deluge system, MIC leak detection alarms, safety relief valves to protect vessels from overpressure, a diesel generator for backup power, sealless pumps for managing liquid MIC, fire protection for pipe rack transfer lines, and an independent nitro- gen supply to prevent cross contamination.

  1. Equipment design. A double-walled underground storage tank, special

pressure vessels, blast material protection for the aboveground MIC storage 2  AIHA Definition 3  AIHA Definition

The Use and Storage of Methyl Isocyanate (MIC) at Bayer CropScience Copyright National Academy of Sciences. All rights reserved. 52 USE AND STORAGE OF METHYL ISOCYANATE (MIC) AT BAYER CROPSCIENCE facilities, stainless steel construction, barriers to protect pipelines over roads, and double-walled pipelines with leak detection analyzers on critical transfer lines.

  1. Safety reviews and procedures. Process hazard analysis completed

every 5 years, ongoing safety reviews for design changes, operational reviews completed for all process changes, and safety review teams that included safety experts, engineers, union operators, and union maintenance personnel. It also established procedures and training inspection, emergency response and incident investigation systems (Fortun, 2001, p. 67). Between 1989 and 1993, although the facility had no EPA-reportable releases (threshold of 10 pounds), it did report 13 leaks of between 1 and 10 pounds, and 30 leaks of less than 1 pound to the local emergency authorities. In 1993, Rhône-Poulenc was fined by OSHA for alleged safety violations that occurred during a non-MIC-related explosion and fire within the methomyl manufacturing unit, which was located near the aboveground MIC storage unit. The incident claimed the life of one plant worker and injured two others. OSHA investigators concluded that the company tried to boost pesticide production without regard for safety (Ward, 1994). The Institute Community Liaison Committee (CLC) commissioned a review of the incident investigation by PrimaTech, Inc. in 1993 (PrimaTech, Inc., 1993). This incident caused considerable concern within the community, and the president of West Virginia State College,4 Hazo Carter, wrote to the plant man- ager stating, As president of West Virginia State College, I am quite concerned about the safety of the more than 5,000 students, faculty, staff, and community residents due to recent accidents and frequent spills at the Institute Rhône-Poulenc plant. I was especially concerned to read that a tank holding 30,000 pounds of methyl isocyanate [MIC] gas was within 250 feet of the explosion and fire. The severity of this situation makes it imperative that every precaution be taken to prevent accidents from happening and that immediate notification be given to us if such accidents should occur in the future. (Carter, 1993) In December 1994, following that explosion, Rhône-Poulenc completed the Institute Modification Project, involving $50 million in improvements. These improvements included: moving the phosgene unit closer to the MIC process to reduce the distance phosgene has to travel in pipes; adding a new cooling system for MIC tanks, using chloroform, rather than water-based brine; ­adding redundant warning systems to detect leaks and to monitor pressure, 4  West Virginia State College became West Virginia State University in 2004.

The Use and Storage of Methyl Isocyanate (MIC) at Bayer CropScience Copyright National Academy of Sciences. All rights reserved. INDUSTRIAL PRODUCTION AND USE OF MIC AT BAYER CROPSCIENCE 53 temperature, and possible water-contamination at concentrations as low as 2 ppm; upgrading the scrubber and flare systems; and adding another backup generator (Ward, 1994). The U.S. Chemical Safety and Hazard Investigation Board (CSB) report on the 2008 incident states that, [t]he five-year accident history for the RMP-regulated chemicals reports an acci- dent that released approximately 15 pounds of phosgene (October 1999), another that released less than 1 pound of chlorine (May 2000), and a third that released approximately 3,000 pounds of liquid chloroform (August 2001). Each resulted in one or more worker exposures, and the phosgene release prompted a shelter-in place-alert. However, the company reports none of the releases involved offsite consequences (CSB, 2011). Following its acquisition of the Institute facility from Aventis CropScience, Bayer CropScience completed 20 projects to enhance process safety and eco- nomic competitiveness, with particular attention paid to the phosgene and MIC units. These changes included a new, downsized phosgene unit, reductions in pipeline capacity in chlorine lines, downsizing the MIC unit to match lower demands (since inventory of MIC required for production was reduced by 80 per- cent since mid-1980s), modernizing equipment and instrumentation to safeguard the purity of the components used in the MIC process, additional emergency neutralization processes, and updated transfer processes. 2008 Accident in Methomyl Facility As described in an earlier section, the production requirements and schedules varied for the different pesticides manufactured at the plant, and the methomyl process (located in the WCC) was only operated periodically in response to sea- sonal demand for the product. These gaps in the production schedule provided opportunities to perform repairs and system upgrades. In 2008, Bayer upgraded the methomyl control system and replaced the residue treater with a stainless steel tank during one of these downtimes. The process was restarted in August, with operations personnel, engineering staff, and contractors working around the clock to complete system upgrades. Dwindling supplies of methomyl and an increase in demand for thiodicarb created pressure to restart the operation (CSB, 2011). On August 28, 2008, amid startup procedures, an explosion occurred, result- ing in the deaths of two plant operators and considerable damage to the WCC. A full investigation of the incident was performed by the CSB and the results of that investigation reported in 2011. An overview of key events and findings from that report is provided here. The upgrades on the methomyl control system were significant, and as a con- sequence, the restart procedures were not routine. At the time of the startup, criti-

The Use and Storage of Methyl Isocyanate (MIC) at Bayer CropScience Copyright National Academy of Sciences. All rights reserved. 54 USE AND STORAGE OF METHYL ISOCYANATE (MIC) AT BAYER CROPSCIENCE cal procedures had not been completed. In particular, process computer system engineers had not verified the functionality of all process controls and instruments in the new control system, and changes to standard operating procedures that were needed because of changes to system controls had not yet been finalized. In addition, the staff struggled with significant problems as they attempted to bring each subsystem online, including a missing valve on a solvent line, non- operational heat tracing on a process line, a broken stem on a vapor condenser water cooling system valve, and many problems tuning control loops and calibrat- ing instruments for the newly installed computer control system. These problems were further complicated by the operators’ lack of familiarity with new methomyl work station functions and changes to some process variables (CSB, 2011). The explosion originated in the new residue treater in the methomyl produc- tion unit. The methomyl was synthesized in solvent through a series of steps. In the final stage, the solvated methomyl was transferred to a crystallizer, where an “anti-solvent” was added to cause the product to precipitate. The solid methomyl was then separated from the solvent via centrifugation. The remaining liquid, consisting of solvent, residual methomyl, and other compounds resulting from the synthesis, was transferred to a “flasher,” where the solvent was separated from the other materials and recycled in the production process. After separa- tion of the solvent, the remaining material (residual solvent, up to 22 percent ­methomyl, and impurities) was transferred to the residue treater. The role of the residue treater was to decompose the remaining methomyl in this liquid to a concentration of no more than 0.5 percent. At that point, this flammable liquid could then be burned for fuel within the facility. By August 28, methomyl production had begun, although the residue treater had not yet been brought online. There were multiple issues with the production startup that operators were endeavoring to fix, one of which was that the system was depleting solvent faster than expected. This created a need to get the solvent recovery system on line as quickly as possible to replenish the solvent. Because the last stage in the solvent recovery process was the residue treater, that system also needed to be brought online. When beginning the startup of the recovery system, operators failed to prefill the residue treater to the minimum operating level and to heat the liquid to the minimum operating temperature before adding the methomyl. Decomposition of methomyl is an exothermic reaction, therefore it was necessary for safe operation of the system to control of temperature and solvent levels. A control system was designed to prevent addition of methomyl until the solvent was at minimum volume and temperature, but the operators bypassed the safety devices during the startup. In addition, samples taken from the liquid coming from the crystallizer indicated that methomyl concentrations were as much as eight times greater than the specified operating limit, the staff did not have time to review the laboratory results and were unaware of the problem (CSB, 2011).

The Use and Storage of Methyl Isocyanate (MIC) at Bayer CropScience Copyright National Academy of Sciences. All rights reserved. INDUSTRIAL PRODUCTION AND USE OF MIC AT BAYER CROPSCIENCE 55 At 10:25 PM, the residue treater high-pressure alarm sounded, and in response, a control board operator directed two outside operators to check the vent system of the residue treater. Eight minutes later, the vessel exploded and initiated a fire that burned for 4 hours. The explosion killed both operators who were sent to inspect the unit; two other workers onsite and six firefighters were treated for possible toxic chemical exposure at a local hospital. The Kanawha-Putnam County Emergency Management Director advised more than 40,000 residents, including the resident students at the West ­Virginia State University directly adjacent to the facility, to shelter-in-place for more than 3 hours (Huntington News Net., 2011). During the emergency, the Bayer ­CropScience emergency response organization failed to provide timely and accu- rate information about the incident. In part this was because, continuous air monitors located in and around the production units to detect MIC leaks had mal- functioned in May, causing spurious alarms. The system had not been repaired and restarted even though the MIC storage tank had been refilled. In addition, fence-line monitors were inadequately designed and located for detecting MIC releases (CSB, 2011). Emergency Response After 2008 In the wake of the accident, the emergency response systems in place at the facility and in the surrounding area were examined, and a number of recommen- dations were made by CSB in the areas of communication and planning. The report also noted efforts by local emergency responders (Metro 9-1-1), KPEPC, and Bayer to improve communication between the three groups in the event of an emergency. These efforts included direct telephone lines installed from the facil- ity to Metro 9-1-1 headquarters, development of a method for e-mailing residents in case of a release, increasing call center capacity, and introducing a 15-minute rule for calling an advisory shelter-in-place if an event has been reported but no additional information is available from the facility. Conversations with Matthew Blackwood and Larry Zuspan, representatives from KPEPC in 2011 and testi- mony provided by Chief Joseph Crawford before Congress in 2009 confirmed that changes to emergency response have been made since the 2008 explosion. CSB also advised modifying KPEPC’s Basic Plan and/or the Functional Annex 16, Chemical HazMat Response, to ensure clear delineation of onsite and offsite authority in case of an incident. The relevant changes within the two documents were adopted by KPEPC in May 2011. In February 2009, as part of a settlement with EPA to resolve issues identi- fied in 2001 at the facility, Bayer agreed to support the following activities as part of supplemental environmental projects (CIC, 2009): • Funding for a breathing air system for the Kanawha Valley Emergency Preparedness Training Center;

The Use and Storage of Methyl Isocyanate (MIC) at Bayer CropScience Copyright National Academy of Sciences. All rights reserved. 56 USE AND STORAGE OF METHYL ISOCYANATE (MIC) AT BAYER CROPSCIENCE • Equipment for the St. Albans, Jefferson and Institute fire departments; • Training courses for Kanawha Valley emergency responders; and • Enhancements for emission dispersion modeling programs for the Metro 9-1-1 center. Note that informal feedback was received after the public meeting in ­Institute, West Virginia from a local volunteer firefighter. He expressed concern about availability of emergency equipment in all jurisdictions in the Kanawha Valley. This question was later raised to KPEPC representatives, who stated that they had no knowledge of any particular concern but that efforts were underway to acquire equipment for local fire departments. It is beyond the scope of this study to look further into this question, but asking local personnel for additional input may aid in identification of any gaps in coverage or, if no such gaps are apparent, assist in dissemination of information about available resources. REFERENCES AAUP (American Association of University Professors). 2011 Black Colleges with Highest White Enrollments [online]. Available: http://www.aaup.org/AAUP/comm/rep/HBCUChart.htm. Ac- cessed: Sept. 29, 2011. Bayer CropScience. 2009. Bayer Crop Science Announces Investment of $25 Million for Insti- tute Site. Bayer News Release: August 26 [online]. Available: http://www.bayerus.com/News/ NewsDetail.aspx?ID=586330BF-C83B-4EF3-93DBFF791373C7D7. Accessed: Feb 14, 2012. Bayer CropScience. 2011a. Bayer CropScience Announces Decision not to Resume. News: March, 18, 2011 [online]. Available: http://www.press.bayer.com/baynews/baynews.nsf/id/Bayer-Crop- Science-announces-decision-not-to-resume-MIC-production. Accessed: Sept. 29, 2011. Bayer CropScience. 2011b. Bayer CropScience to Reduce Operations in Institute, West Virginia, and Close Woodbine, Georgia, Site. News: January 11, 2011 [online]. Available: http://www.bayer cropscience.com/bcsweb/cropprotection.nsf/id/EN_20110111?open&l=EN&ccm=500020. Ac- cessed: Sept. 29, 2011. Bayer CropScience. 2011c. Overview [online]. Available: http://www.bayercropscience.com/bcsweb/ cropprotection.nsf/id/AccessPlans. Accessed: Sept. 29, 2011. Baron, R. C., R. A. Etzel, and L. M. Sanderson. 1988. Surveillance for adverse health effects follow- ing a chemical release in West Virginia. Disasters 12:356-365. Blackwood, M. and Zuspan, L. 2011. Discussion with NRC Committee. Washington, DC. Carter, H. W. 1993. Letter to Van Long, Plant Manager, Rhône-Poulenc, Charleston, W., from Hazo W. Carter, President, West Virginia State College. August 30, 1993 [online]. Available: http:// library.wvstateu.edu/facultysenate/acadyear2008-2009/environmental-issues/Rhône-Polenc- PresCarter-Aug30-1993.pdf. Accessed: Feb. 16, 2012. CIC (Community Improvement Committee). 2009. Community Minutes of March 25 meeting. CSB (U.S. Chemical Safety and Hazard Investigation Board). 2011. Investigation Report: Pesticide Chemical Runaway Reaction Pressure Vessel Explosion, Bayer CropScience, LP, Institute West Virginia, August 28, 2008. Washington, DC: CSB [online]. Available: http://www.csb.gov/ assets/document/Bayer_Report_Final.pdf. Accessed: Sept. 29, 2011. EPA (U.S. Environmental Protection Agency). 2004. Carbaryl IRED Facts, October 2004 [online]. Available: http://www.epa.gov/opp0001/reregistration/REDs/factsheets/carbaryl_factsheet.pdf. Accessed: May 1, 2012.

The Use and Storage of Methyl Isocyanate (MIC) at Bayer CropScience Copyright National Academy of Sciences. All rights reserved. INDUSTRIAL PRODUCTION AND USE OF MIC AT BAYER CROPSCIENCE 57 EPA. 1998. R. E. D. Facts Thiodicarb [online]. Available: http://www.epa.gov/opp00001/chem_ search/reg-actions/reregistration/fs_PC-114501_1-Dec-98.pdf. Accessed: May 1, 2012. EPA. 2009. Bayer CropScience to Pay Penalty for Environmental Violations. U.S. Environmental Protection Agency, Region 3, News Release, February 27 [online]. Available http://yosemite. epa.gov/opa/admpress.nsf/90829d899627a1d98525735900400c2b/c0a0da8becf0bf6b8525756e 004d6226!OpenDocument. Accessed: Feb. 2, 2012. EPA. 2010. Agreement to Terminate All Uses of Aldicarb, October 2010 [online]. Available: http:// www.epa.gov/oppsrrd1/REDs/factsheets/aldicarb_fs.html. Accessed: Sept. 29, 2011. Fortun, K. 2001. Advocacy After Bhopal: Environmentalism, Disaster, New Global Orders. Chicago: University of Chicago Press. Houston Chronicle. 1985. Nervous System Toxin Predominated in Carbide Leak Section 1, p. 2, August 16 [online]. Available: http://www.chron.com/CDA/archives/archive.mpl/1985_31269/ nervous-system-toxin-predominated-in-carbide-leak.html. Accessed: Sept. 29, 2011. Huntington News Net. 2011. Abbreviated Text of Citizens Complaint against Bayer to Prevent MIC Restart, February 9. Available: http://www.huntingtonnews.net/1563?format=print. KPEPC (Kanawha/Putnam Emergency Planning Committee). 2011. History [online]. Available: https://www.kpepc.org/history/default.aspx. Accessed: Sept. 29, 2011. Los Angeles Times. 1985. Union Carbide Delays Resuming Production of Chemical That Killed 2,000. May 4 [online]. Available: http://articles.latimes.com/1985-05-04/news/mn-20608_1_ union-carbide-corp. Accessed Sept. 29, 2011. Martin, W. 2011. ECC Presentation to NAS. Presentation at the Second Meeting on Inherently Safer Chemical Processes. March 21-22, 2011, West Virginia State University. OECD (Organisation for Economic Co-operation and Development (OECD). 1997. OECD Environ- mental Health and Safety Publications Series on Chemical Accidents No. 1: Report of the OECD Workshop on Risk Assessment and Risk Communication in the Context of Chemical Accident Prevention, Preparedness and Response. Paris: OECD [online]. Available: http://www.oecd. org/officialdocuments/displaydocumentpdf/?cote=ocde/gd%2897%2931&doclanguage=en. Ac- cessed: Feb. 2, 2012. PCMIC (People Concerned About MIC). 2011. History [online]. Available: http://peopleconcerned- aboutmic.com/history/. Accessed: Sept. 29, 2011. PrimaTech, Inc. 1993. “Audit of Incident Investigation and Review of Emergency Response to August 18, 1993 Incident at Rhône-Poulenc AG Company Institute, West Virginia.” Princeton, NJ. Smythe, S. 2011. An Evaluation of Alternate MIC Technologies. Presentation at the First Meeting on Inherently Safer Chemical Processes, February 9. Washington, DC. U.S. News. 2010. College Ranking & Lists: West Virginia State University [online]. Available: http:// colleges.usnews.rankingsandreviews.com/best-colleges/west-virginia-state-3826. Accessed: Sept. 29, 2011. Ward, K., Jr. 1994. Is MIC unit safe or a potential Bhopal? Sunday Gazette Mail, B-1, May 8 [online]. Available: http://wvgazette.com/static/watchdog/micstory.pdf. Accessed: Sept. 28, 2011. Ward, K., Jr. 2010. Bayer to stop making one of its MIC pesticides. The Charleston Gazette, August 17 [online]. Available: http://blogs.wvgazette.com/watchdog/2010/08/17/bayer-to-stop-making- one-of-its-mic-pesticides/. Accessed: Sept. 29, 2011. Ward, K., Jr. 2011. Residents Sue to Delay Start-Up of Bayer’s MIC Unit. The Charleston Gazette, February 9 [online]. Available: http://wvgazette.com/News/Bayerexplosion/201102081007?pa ge=2&build=cache. Accessed: Sept. 29, 2011. Woomer, W. J. 2000. The Institute Site: From George Washington to the World of Chemicals. Charles- ton, WV: B. J. W Printing.

The Use and Storage of Methyl Isocyanate (MIC) at Bayer CropScience Copyright National Academy of Sciences. All rights reserved.

The Use and Storage of Methyl Isocyanate (MIC) at Bayer CropScience Copyright National Academy of Sciences. All rights reserved. 4 The Concepts of Inherently Safer Processes and Assessment INTRODUCTION The committee was asked to consider the processes used by Bayer Crop- Science to manufacture methyl isocyanate (MIC) and carbamate pesticides in Institute, West Virginia, and compare its analysis to “the inherently safer process assessments conducted by Bayer and previous owners of the Institute site.” Whereas the preceding chapter provided an overview of the plant and its history to provide background on the development of the processes, this chapter provides an overview to the concept of inherently safer processes (ISPs) and describes the role of ISPs in a process safety management (PSM) system as background for the analysis of the decisions made during those developments. Chapter 5 contains the analysis of alternative methods for production of MIC and the carbamate pesticides produced in Institute, including consideration of ISPs. This chapter also provides an introduction to the role that ISP analyses can play in decision- making. More information about the broader context in which companies manage decision making, and a suggested framework for approaching that process in complex scenarios, is presented in Chapter 6. THE ISP CONCEPT ISP is best described as a philosophy for engineering design of material processing plants, rather than a specific set of technologies or processes. The ISP philosophy can be applied at all stages in the life cycle of a manufacturing plant, from early process invention and research, through development, plant design, operation, and eventual shutdown and demolition, and at all levels of design detail. 59

The Use and Storage of Methyl Isocyanate (MIC) at Bayer CropScience Copyright National Academy of Sciences. All rights reserved. 60 USE AND STORAGE OF METHYL ISOCYANATE (MIC) AT BAYER CROPSCIENCE It is an approach that encourages the designer to attempt to eliminate or minimize hazards (physical, inhalational, etc.) identified at each stage in the process life cycle, and at every level of process and plant design, rather than accepting the existence of the hazards and designing safety systems to control those hazards. It may not always be feasible to eliminate or reduce hazards, but the ISP philosophy requires that this be attempted before moving on to specification of risk manage- ment equipment and procedures. Note that describing a process as “inherently safer” can only be done in the context of specific hazard or subset of hazards and that management of all hazards must be considered in order to design a safer process. Thus, a substitution (inherent) might eliminate one type of hazard but require the development of new standard operating procedures (procedural) to manage a different one. The terms “inherently safer processes” (ISPs),1 and variations such as “inher- ently safer technology” (IST) and “inherently safer design” (ISD) were first used in discussions about PSM in the 1970s after serious process industry incidents around that time.2 These incidents focused industry, government, and public attention on PSM, and resulted in the initial development of many of the PSM techniques and regulations that are in common use throughout the world today. The ISP philosophy was first fully articulated in 1977 by Trevor Kletz, a senior safety advisor for Imperial Chemical Industries (ICI). That year Kletz presented the Jubilee Lecture to the Society of Chemical Industry in Widnes, England, which he titled “What you don’t have, can’t leak.” In his talk, Kletz challenged the practice of storing large quantities of flammable or toxic mate- rials at manufacturing plants and questioned the need for the use of elevated temperatures and pressures in processing (Kletz, 1978). He also suggested that risk management efforts should aim at elimination of hazards where feasible, instead of using safety systems and procedures to manage the risk. This should be accomplished, for example, by reducing the amounts of hazardous material used in processes, using less-hazardous materials, or developing technology that allows for processes to proceed under milder conditions. Kletz described this as “inherently safer.”3 In subsequent years, a set of principles for ISPs were established within the chemical community, an effort supported by Kletz (1984, 1985, 1991, 1998) and others in the chemical industry (Puranik et al., 1990; Ashford, 1993; Windhorst, 1995; Mannan, 2005; See also additional references at the end of this chapter). As 1  The term “inherently safer processes” is used here in accordance with the language of the state- ment of task. 2  These included a 1974 explosion at a chemical plant in Flixborough, England that resulted in the deaths of 28 and injuries to another 36 individuals and a 1976 chemical release at Seveso in Milan, Italy that sickened many in the surrounding area. 3  In his 1977 lecture, Kletz used the term “intrinsically safer.” This was later changed to “inherently safer” to avoid confusion with the use of “intrinsically safe” to describe electrical equipment designed to meet specific hazardous area classification requirements.

The Use and Storage of Methyl Isocyanate (MIC) at Bayer CropScience Copyright National Academy of Sciences. All rights reserved. THE CONCEPTS OF INHERENTLY SAFER PROCESSES AND ASSESSMENT 61 the principles spread and were adopted, many examples of their implementation emerged. The Center for Chemical Process Safety (CCPS) aggregated this infor- mation in the book Inherently Safer Chemical Processes: A Life Cycle Approach (Bollinger et al., 1996; CCPS, 2008b). The early versions focused primarily on general concepts, but as acceptance of ISPs by the professional community has grown, the later versions extended the scope to provide more specific guidance on application of those concepts to process design. Today there are a number of working definitions of ISPs, some of which are presented in Box 4.1. In general, these definitions are quite consistent and reflect a consensus of the engineering community on what ISP means. BOX 4.1 Definitions of Inherently Safer Processes CCPS (2008b, p. 11). “Inherent safety is a concept, an approach to safety that focuses on eliminating or reducing the hazards associated with a set of conditions. A chemical manufacturing process is inherently safer if it reduces or eliminates the hazards associated with materials and operations used in the process and this reduction or elimination is permanent and inseparable. The process of identifying and implementing inherent safety in a specific context is called inherently safer design. A process with reduced hazards is described as inherently safer compared to a process with only passive, active, and procedural controls. An inher­ ently safer process should not, however, be considered ‘inherently safe’ or ‘absolutely safe.’ While implementing inherent safety concepts will move a process in the direction of reduced risk, it will not remove all risks. No chemical process is without risk, but all chemical processes can be made safer by applying inherently safer concepts.” Kletz and Amyotte (2010, p. 4). “Intensification, substitution, attenua­ tion, and limitation of effects produce inherently safer design because they avoid hazards instead of controlling them by adding protective equipment. The term inherently safer implies that the process is safer because of its very nature and not because equipment has been added to make it safer. Note that we talk of inherently safer plants, not inherently safe ones, for we cannot remove all hazards.” State of New Jersey and Contra Costa County, California. New ­Jersey, in its Toxic Catastrophe Prevention Act (TCPA) (NJDEP, 2009), and ­Contra Costa County, California, in its Industrial Safety Ordinance continued

The Use and Storage of Methyl Isocyanate (MIC) at Bayer CropScience Copyright National Academy of Sciences. All rights reserved. 62 USE AND STORAGE OF METHYL ISOCYANATE (MIC) AT BAYER CROPSCIENCE (­Contra Costa Health Services, 1999), require consideration of ISPs as part of their regulation of hazardous industrial facilities. Both regulations cite the 1996 CCPS definition of ISP (Bollinger et al., 1996) (the regula­ tions were ­issued before publication of the second edition of the CCPS book), which is substantially the same as the 2008 definition above, although not as concisely stated. U.S. Department of Homeland Security/CCPS. The U.S. Department of Homeland Security (DHS), concerned about the potential for intentional release of hazardous materials by terrorist attack, has been interested in ISP as an approach to chemical security. In 2010, the Chemical Security Analysis Center of DHS asked the CCPS to develop a scientific definition of IST (CCPS, 2010, p. Exec 1). A summary of that definition is: Inherently Safer Technology (IST), also known as Inherently Safer ­Design (ISD), permanently eliminates or reduces hazards to avoid or reduce the consequences of incidents. IST is a philosophy, applied to the design and operation life cycle. . . . IST considers options, including eliminating a hazard, reducing a hazard, substituting less hazardous material, using less hazardous process conditions, and design a process to reduce the potential for, or consequences of, human error, equipment failure. . . . IST’s are relative. A technology can only be described as inherently safer when compared to a different technology, including a description of the hazard or set of hazards being considered, their location, and the potentially ­affected population. . . . IST’s are based on an informed decision process. Because an option may be inherently safer with regard to some hazards and inherently less safe with regard to others, decisions about the optimum strategy for managing risks from all hazards are required. The decision process must consider the entire life cycle, the full spectrum of hazards and risks, and the potential for transfer of risk from one impacted popula­ tion to another. BOX 4.1 Continued HIERARCHY OF HAZARD CONTROL PSM is an interactive, ongoing method for controlling hazards across a facility or organization, with the overall goal of reducing the frequency and/or consequence of an incident. As described in Chapter 2, within the United States, requirements for PSM exist under the Occupational Health and Safety Administra- tion’s (OSHA) process safety management standard (OSHA, 29 CFR 1910.119). The PSM standard lists 14 mandatory elements ranging from employee training to process hazard analysis to change management. In practice, PSM is a system

The Use and Storage of Methyl Isocyanate (MIC) at Bayer CropScience Copyright National Academy of Sciences. All rights reserved. THE CONCEPTS OF INHERENTLY SAFER PROCESSES AND ASSESSMENT 63 that necessitates consideration of multiple options for achieving a safe process and the possible outcomes from each of those options. For example, when deter- mining which hazard management strategy is the best option for a given situation, it is important to understand the effect that any one change in process design may have on all classes of hazard and how that change may affect the type of control strategy required to maintain a safe working environment. One approach for acknowledging and addressing these trade-offs is to con- sider a hierarchy of hazard control. The hierarchy contains four tiers, inherent, passive, active, and procedural, which are described briefly below.4,5 Consider- ing these possible hazard control methods in turn can help identify options for process design or modifications to improve process safety. Inherent The inherent approach to hazard control is to minimize or eliminate the hazard. Substituting water for a flammable solvent to eliminate the fire hazard is an example. CCPS identifies four ISP strategies to consider when designing or modifying a process (CCPS, 2008b). As adapted from that volume, one can: Substitute—use materials, chemistry, and processes that are less hazardous; Minimize—use the smallest quantity of hazardous materials feasible for the process, reduce the size of equipment operating under hazardous conditions, such as high temperature or pressure; Moderate—reduce hazards by dilution, refrigeration, process alternatives that operate at less-hazardous conditions; reduce potential impact of an accident by siting hazardous facilities remotely from people and other property; or Simplify—eliminate unnecessary complexity, design “user-friendly” plants. Kletz and Amyotte (2010, pp. 16-17) use somewhat different terminology and identify more specific categories (which can be mapped into the four CCPS categories above), but the basic philosophy remains the same. As stated in that reference: One person’s intensify may be another’s minimize. Someone’s attenuate may be someone else’s moderate. You may wish to consider segregate as a measure 4  As with the terminology regarding inherent safety categories, these classifications fall along a spectrum of process safety approaches, and people may disagree about the category into which a par- ticular design falls. For example, some might consider that a high pressure reactor design capable of containing a runaway reaction is an inherently safer design. Others would call this a passive strategy because the hazard—the high pressure from the runaway reaction—still exists, although it is robustly contained by a high pressure vessel. 5  Not that the use of these terms is not limited to chemical process safety but are also used in consideration of nuclear facility design and management.

The Use and Storage of Methyl Isocyanate (MIC) at Bayer CropScience Copyright National Academy of Sciences. All rights reserved. 64 USE AND STORAGE OF METHYL ISOCYANATE (MIC) AT BAYER CROPSCIENCE separate from inherent safety; your colleague may consider it a form of limita- tion of effects….the characteristics of a user-friendly plant are sometimes not sharply divided and may merge into one another. Process design, like life, is seldom linear. The following definitions will be familiar to many in the process industry. These have been summarized and adapted from the 2008 publication Inherently Safer Chemical Processes: A Life Cycle Approach, 2nd Edition from the AIChE Center for Chemical Process Safety, and similar definitions can be found in many reference texts on process safety. Passive Passive safety systems are those that control hazards with process or equip- ment design features without additional, active functioning of any device. For example, a containment dike around a hazardous material storage tank limits a spill to an enclosed area because of the geometry and construction of the dike, and no action is required to provide this function. Active Active safety systems control hazards through controls and systems designed to monitor and maintain specific conditions or to be triggered by an event. Active systems include process controls, safety instrumented systems (SIS), and mitiga- tion systems. A sprinkler system put in place to extinguish a fire is an example of an active system designed to minimize consequences. A control system that regulates solvent flow into a reactor vessel and prevents overflow is an example of a monitoring system. Procedural Procedural safety systems control hazards through personnel education and management. Such systems include standard operating procedures, safety rules and procedures, operator training, emergency response procedures, and manage- ment systems. For example, an operator may be trained to monitor the solvent level in a reactor vessel and to shut off the feeds to the tank if the volume exceeds a given quantity. In general, inherent and passive strategies are the most robust and reliable, requiring the least monitoring or interaction to be effective, but incorporation of strategies from all tiers of the hierarchy should be considered and incorporated as needed for comprehensive PSM. Note that all process safety controls have the potential to reduce the probability or likelihood that a worst-case accident

The Use and Storage of Methyl Isocyanate (MIC) at Bayer CropScience Copyright National Academy of Sciences. All rights reserved. THE CONCEPTS OF INHERENTLY SAFER PROCESSES AND ASSESSMENT 65 occurs. However, the incorporation of ISP concepts into process design also has the potential to provide assurance that, should a worst-case release occur (i.e., the entire chemical inventory under worst meteorological conditions), an absolute upper bound to the magnitude of an offsite release exists, and that this upper bound is less severe than the worst-case accident resulting from conventional passive, active, and procedural controls. When performing a process safety assessment, one should consider each level of this process safety “hierarchy” in turn. Quite logically, if the hazard can be controlled with a system that emphasizes inherent safety, active controls will not be necessary. However, since ISP is defined in the context of a specific hazard, the risk of introducing new hazards must be considered. For example, one can describe a process alternative as inherently safer with respect to the acute toxicity of a particular raw material when compared with another alternative. This state- ment does not say anything about the relative inherent safety characteristics of the two processes with respect to other hazards (fire, explosion, reactive chemis- try, chronic toxicity, environmental impact, etc.). These hazards may be greater, reduced, or remain essentially unchanged between the two process alternatives, and the ISP for one hazard may also introduce new concerns. Thus, it will always be necessary for process plant designers and operators to develop rigorous PSM systems incorporating the appropriate combination of inherent, passive, active, and procedural safety systems to manage all hazards. Some will be best managed using inherent methods, but others will inevitably remain and be effectively managed with other PSM systems. One must never assume that it is unnecessary to worry about all elements of PSM because one “inherently safer” process has been implemented. INCORPORATING ISP INTO THE PROCESS LIFE CYCLE The philosophy of ISP applies at all stages, but available options, or the feasibility of implementing those options, change over the course of a tech- nology’s life cycle. Every life cycle begins with initial research and product/ process conception, and then moves through process development, conceptual plant design, scaleup, engineering and detailed plant design, plant construction, startup, and ongoing operation and future modification (Hendershot, 2011a,b). In each of these phases, different kinds of choices and decisions are made by chemists, engineers, and other technologists. Both the second edition of the CCPS book, Inherently Safer Chemical Processes: A Lifecycle Approach and the recent volume by Kletz and Amyotte contain examples of how such analyses can be incorporated into a process hazard analysis, including examples from industry, and each contains additional citations for more information. These descriptions will not be reproduced here. The purpose of this section is not to provide a step- by-step description of how such analyses can be done, but to provide the reader

The Use and Storage of Methyl Isocyanate (MIC) at Bayer CropScience Copyright National Academy of Sciences. All rights reserved. 66 USE AND STORAGE OF METHYL ISOCYANATE (MIC) AT BAYER CROPSCIENCE with a broad overview of the elements of the analysis as context for the rest of the report. There is potential synergy between process simulation and understanding ISP characteristics of a process. Process simulation is a mathematical representation of industrial chemical processes, often used in process design, control, and optimiza- tion. Simulations assist engineers in evaluating process alternatives and to identify possible options to, for example, reduce energy consumption, minimize waste, perform cost and benefit studies, and maximize profitability. These tools provide information about process operating conditions and inventory in-process equip- ment, both of which are important factors in understanding ISP. It may be possible to more explicitly incorporate ISP considerations into process simulation tools, e.g., the inventory of hazardous materials for different process options. Linking process simulation models to accident consequence and likelihood ­models would have the potential to facilitate the investigation of potential benefits of process alternatives being studied. It is clear that the best opportunity for implementing ISP into a facility is early in the life cycle of a product or process. At that early stage, process tech- nologies have not been chosen, facilities have not been built, and customers have not yet evaluated product samples or made commitments based on products with particular characteristics. As a product moves through its life cycle, these and other factors may limit options, make changes more difficult, or involve more people and organizations in the change. Development of an ISP, as with the devel- opment of any new process, requires extensive resources, including for example, expert personnel, laboratory facilities, pilot plant facilities, and significant finan- cial expenditures, and modifications can become more costly when the process involves modification of an existing facility. Some typical process life-cycle stages and some examples of ISP options that are best considered at an early stage include: • Selection of basic technology. Consider ISP options for the chemical synthesis route, raw material and chemical intermediate hazards, energetic reac- tions, etc. • Implementation of the selected technology. Consider how the chosen process chemistry will be implemented. Can hazardous operating conditions be minimized through better catalysts or other changes in operating conditions? Can impurities and by-products be avoided to eliminate purification steps? What specific unit operations are required? What is the order of processing steps? • Plant design. Consider ISP aspects of plant proximity to the surrounding population, in-plant occupied areas, and sensitive environmental areas; the gen- eral layout of the equipment on the selected plant site; and the number of parallel systems and size of those system (Hendershot, 2010a). • Detailed equipment design. Minimize the inventory of hazardous mate- rial in specific pieces of process equipment. Consider the impact of equipment

The Use and Storage of Methyl Isocyanate (MIC) at Bayer CropScience Copyright National Academy of Sciences. All rights reserved. THE CONCEPTS OF INHERENTLY SAFER PROCESSES AND ASSESSMENT 67 layout on the length and size of piping containing hazardous materials. Consider human factors in the design of equipment to minimize the potential for incorrect operation and human error (Hendershot, 2010a). • Operation. Use ISP principles on ongoing PSM activities such as man- agement of change, incident investigation, pre-startup safety reviews, operating procedures, and training to identify new opportunities for ISP. It is important to consider the entire footprint of a process when evaluating ISP options. Is risk actually reduced, or is it transferred somewhere else, perhaps increasing overall risk? One example used to demonstrate this concept relates to the balance of onsite storage versus increased deliveries of hazardous mate- rial (Hendershot, 2006; CCPS, 2010). If a plant reduces the size of a hazardous material storage tank, would the smaller tank size require a change from shipment of the material to the plant in railroad tank cars to much smaller trucks? Such a change could then result in a greater number of shipments overall to meet process requirements (one rail car can hold approximately an order of magnitude more material than a truck). With the additional shipments traveling by road instead of rail, the change in storage tank size could result in greater overall risk from release, depending on details of the transportation route. It is also important to recognize that an ISP assessment is often not going to result in a clear, well-defined, and feasible path forward for a company. It is a useful philosophy that can help a company reduce its risk and provide struc- ture for consideration of the full range of options in process design. The results of any analysis, however, have to be considered in context. For example, as already described, the inherent safety of one hazard may be reduced and another increased depending on size of a shipment or the mode of transportation of the shipment, or risk may shift from one community well equipped to respond to an emergency to one less able to do so. The cost to eliminate a hazard completely may be prohibitive, but introducing a well-designed passive control system may be feasible. Consideration of these and other, broader trade-offs (community perception, product quality requirements, etc.) should be factored into any final decision. ADDITIONAL CONSIDERATIONS As stated in Manuele (2003), “An organization’s culture consists of its ­values, beliefs, legends, rituals, mission, goals, performance measures, and sense of responsibility to its employees, to its customers, and to its community, all of which are translated into a system of expected behavior.” When the philosophy of ISP is incorporated into the culture of an organization, it becomes one of the cultural norms that guide behavior within that organization. Consideration of ISP can then be incorporated into all process and design activities rather than being considered an additional check-the-box exercise.

The Use and Storage of Methyl Isocyanate (MIC) at Bayer CropScience Copyright National Academy of Sciences. All rights reserved. 68 USE AND STORAGE OF METHYL ISOCYANATE (MIC) AT BAYER CROPSCIENCE CCPS (2008) highlighted elements within organizations that can encourage successful adoption of ISP as part of the organizational culture. The first of these is integration of ISP into the PSM system. This should include consideration of ISP at all stages in the process life cycle, particularly at three key stages: product and process development, conceptual facility planning and early design, and during routine operation (including modifications and incident investigation). The second element is education and awareness. ISP is a philosophy of design; its application should extend beyond just engineering design to plant operation activities. Identifying opportunities to eliminate or reduce hazards should be part of the job for everyone involved in the design and operation of a process facility. This can only happen if there is a broad awareness and understanding of ISP concepts and principles, and these require that education and supporting documentation be made available to personnel. RELATIONSHIP BETWEEN EMERGENCY PREPAREDNESS AND ISP Emergency preparedness (EP is often considered to be an alternative to ISP strategies because EP is a procedural control). However, as is the case with active, passive, and other procedural controls (e.g., personnel training), EP can—and should—be implemented concurrently with ISP, e.g., where Horng et al. (2005) recommended combining source reduction with warning systems to reduce ­chlorine risks in Taiwan. A closer examination reveals that EP and ISP are closely linked because the latter can be used to reduce the magnitude of incident demands on the onsite and offsite emergency response organizations by reducing the size of the vulnerable zones (VZs) around chemical facilities. Specifically, applying ISP principles to the EPA (1987) procedure for calculating VZs shows that substitution decreases VZ size by reducing source toxicity (i.e., level of concern), whereas minimization achieves this objective by reducing the quantity available for release, and moderation reduces VZ size by decreasing the temperature and pressure of a release. Smaller VZs reduce the demands on the emergency response organizations by reducing the size of the population at risk. Of particular importance is the fact that smaller VZs often mean that there are smaller special populations at risk—such as residents of schools, hospitals, nursing homes, jails, and athletic stadiums (see Lindell and Perry, 2006, Table 1, for a list of special facilities). Special populations generally have more logistical impediments to implementing population protection actions such as evacuation (Van Willigen et al., 2002) and, probably to a lesser extent, sheltering in-place (Sorensen et al., 2004). Although the adoption of ISP strategies can have a positive effect on nearby offsite risks, it is important to recognize that they can have a negative effect on more remote offsite risks by transferring rather than reducing total risk (see CCPS, 2008b, p. 212). This risk transfer occurs when reducing onsite chemical inventory has the unintended consequence of increasing the number of shipments

The Use and Storage of Methyl Isocyanate (MIC) at Bayer CropScience Copyright National Academy of Sciences. All rights reserved. THE CONCEPTS OF INHERENTLY SAFER PROCESSES AND ASSESSMENT 69 and thus increasing the probability of releases on transportation routes. This can have an adverse impact on emergency response because releases from onsite sources, by their very nature, take place at locations where they are expected to occur and where there are (relatively) ample resources for emergency response. Releases during transportation, by contrast, take place at unexpected locations where there are likely to be fewer resources to support an emergency response. For example, the sites of transportation incidents will lack the detection and monitoring systems that are often installed around fixed-site facilities. Moreover, the primary responders to transportation incidents will be public sector hazardous materials response teams that are likely to have a relatively limited knowledge of any given chemical, given that hundreds of chemicals might pass through their jurisdictions. By contrast, facility personnel often handle only a few chemicals and thus usually have a deeper knowledge of these chemicals’ characteristics and behavior. Additional information about the relationship between ISP and emergency response and emergency preparedness can be found in Appendix C. OPTIONS FOR INCORPORATING ISP IN PSM There are two common approaches to formal consideration of ISP: inde- pendent, stand-alone ISP reviews and incorporation of ISP into existing process safety review activities. Independent ISP Reviews An independent ISP review is conducted by a team that uses knowledge of chemistry, engineering, operation, process safety, and other relevant expertise to examine a process with the objective of understanding its hazards and finding ways to eliminate or reduce those hazards. The review can be done at any stage in the process life cycle from early product and process development through oper- ating facilities. The more established the process, the more difficult and costly it becomes to take advantage of ISP opportunities involving the basic process technology. Thus, early consideration of ISP in product and process selection is important. Major renovation of established facilities also provides an opportunity to reevaluate the basic process technology from an ISP perspective. The most important tool for an ISP review is an extensive checklist to help the team think about strategies and how they might apply to the process being considered. ISP reviews can draw upon any of the traditional process safety review techniques (e.g., HAZOP,6 What If, and Checklists) to identify hazards, 6  HAZOP (Hazard and Operability Analysis) is a method of systematic evaluation of existing pro- cesses and operations developed for process hazard analysis and commonly used within the chemical industry.

The Use and Storage of Methyl Isocyanate (MIC) at Bayer CropScience Copyright National Academy of Sciences. All rights reserved. 70 USE AND STORAGE OF METHYL ISOCYANATE (MIC) AT BAYER CROPSCIENCE and then use ISP checklists and principles to help identify opportunities to eliminate or reduce hazards. (See, CCPS, 2008b.) Some organizations have also incorporated incident consequence modeling into these reviews to help the review team understand the magnitude of a potential incident arising from the hazard and the potential benefit of ISP approaches to reducing the incident’s consequences. It is important to remember, however, that there are limitations to the use of checklists, and they should be considered only one element of the review and evaluation process. Incorporation into Process Safety Reviews Designers and operators of processing facilities use a series of health, safety, and environmental reviews at various stages in process design, development, and operation as a part of their PSM procedures. The goal is to identify hazards, and in many cases, the focus is on managing or mitigating the hazards through add-on safety devices and procedures once they have been identified. To include ISP considerations, the protocols for conducting these reviews need to specifically require consideration of ISP opportunities as a part of these reviews. Additional, ISP-specific guide words can be added to guide word-based methodologies, such as HAZOP to encourage ISP consideration. ISP consider- ations also can be incorporated into all PSM activities, for example, manage- ment of change, incident investigation, pre-startup safety reviews, operating procedures, human factors reviews, and any other activities that generate lists of hazards and potential incidents. The important thing is to make sure that the participants in the activity are encouraged and trained to focus initially on elimi- nating and reducing hazards instead of managing and controlling hazards. This may not always be possible or feasible, but the participants should look for those opportunities rather than just assume that the hazards are present and design systems and procedures to control them. These two approaches complement each other, and strong PSM programs incorporate both pieces. MEASURING INHERENT SAFETY When incorporating ISP into the PSM system, it would obviously be helpful to have a method for evaluating the inherent safety of any given approach. To that end, a relatively large number of ISP assessment tools exist for attempting to measure the degree of inherent safety of a given process or processing alter- native, but there is no current consensus on ISP metrics. These techniques have been reviewed by, among others, Lees (Mannan, 2005, pp. 32.11-32.18), Khan and Amyotte (2003), Khan et al. (2003), and Kletz and Amyotte (2010). Most of these reviews have originated in the academic arena, and in general, these indices have not been applied in industry because they are in early stages of develop-

The Use and Storage of Methyl Isocyanate (MIC) at Bayer CropScience Copyright National Academy of Sciences. All rights reserved. THE CONCEPTS OF INHERENTLY SAFER PROCESSES AND ASSESSMENT 71 ment and their value has not been accepted. One potential problem is that many of the proposed indices consider many different kinds of process hazards—fire, explosion, acute toxicity, chronic toxicity, temperature, pressure, etc.—and use penalty factors to create an overall hazard index. This means that the creator of the index has applied some kind of evaluation of the relative importance of different hazards. If, as is often the case, the origin and justification for the relative importance are unclear, appropriate use of the index can be challenging. One of the earliest efforts to develop an assessment tool was the approxi- mately decade-old INSIDE (INherent SHE [Safety, Health, Environment] In DEsign) project conducted in Europe, and which resulted in INSET (INherent SHE Evaluation Tool), a toolkit “to identify inherently safer design options throughout the life of a process and to evaluate the options” (CCPS, 2008a). There are also well-known process safety methodologies such as checklist and what-if analyses that have been adapted for ISP consideration, primarily in terms of identifying hazards that could be addressed by the principles of inherent safety. Well-established indexing methods such as the Dow Fire and Explosion Index (F&EI) (Dow Chemical Co., 1994b), the Dow Chemical Exposure Index (CEI) (Dow Chemical Co., 1994a), and the Mond Index (Doran and Greig, 1993) have numerous inherent safety aspects associated with their calculation procedures. The F&EI is a tool designed to help rank hazards in terms of relative physical damage in case of fire or explosion at a facility, and the CEI is a tool to aid in ranking the acute health hazard potentials of materials in the event of an airborne chemical release. The F&EI contains many elements related to ISP— for example, inventory of flammable or combustible material, high temperature, high pressure, exothermic reaction chemistry. However, the F&EI only considers fire and explosion hazards. The CEI was designed to consider material toxicity. Although these indexes have some value in characterizing the inherent safety of a plant, neither was developed with the intention of measuring inherent safety. The Mond Index is similar to the Dow F&EI, but is designed to address a wider range of materials and process and storage configurations. Etowa et al. (2002) quantified the ISP features of both Dow indexes (F&EI and CEI) and demonstrated the beneficial impact of the principles of minimi- zation, substitution, and moderation. The work of Edwards and coworkers at Loughborough University in the United Kingdom resulted in one of the first indexes designed specifically to address ISP opportunities—the prototype index of inherent safety, or PIIS (Edwards and Lawrence, 1993; Edwards et al., 1996). Over the past decade there has been a proliferation of ISP indexing proce- dures and assessment methodologies appearing in the process safety literature. Table 4.1, adapted and updated from Kletz and Amyotte (2010) presents a sum- mary of the literature in the area from 2002-2010. Observations on the entries in Table 4.1 (again adapted from Kletz and Amyotte, 2010) include the following:

The Use and Storage of Methyl Isocyanate (MIC) at Bayer CropScience Copyright National Academy of Sciences. All rights reserved. 72 USE AND STORAGE OF METHYL ISOCYANATE (MIC) AT BAYER CROPSCIENCE TABLE 4.1  Examples of Development of ISP Assessment Methodologies and Their Application and Extension, 2002-2010 Reference Contribution Adu et al. (2008) Comparative evaluation of various methods for assessing EHS hazards in early phases of chemical process design. Al-Mutairi et al. (2008) Linking of inherent safety and environmental concerns with optimization of process scheduling. Carvalho et al. (2008) Method for identifying retrofit design alternatives of chemical processes. Uses Inherent Safety Index (ISI) developed by other researchers. Cordella et al. (2009) Further development of procedure for decomposition product analysis (Cozzani et al., 2006) to account for acute and long-term harm to human health, ecosystem damage, and environmental media contamination. Cozzani et al. (2006) Procedure for assessment of hazards arising from decomposition products formed due to loss of chemical process control. Applicable to consideration of substitution principle. Gentile et al. (2003) Fuzzy-logic-based index for evaluation of inherently safer process alternatives with the aim of linking to process simulation. Gupta and Edwards (2003) Graphical approach for evaluating inherent safety based on earlier developed Loughborough Prototype Index of Inherent Safety (PIIS). Hassim and Hurme (2010a) An Inherent Occupational Health Index was developed to assess the health risk of process routes during the process research and development stage. The index can be used to compare process routes or to determine the level of inherent occupational health hazards. Hassim and Hurme (2010b) The Health Quotient Index (HQI) was developed for assessment during the preliminary process design phase. This index quantifies a worker’s health risk from exposure to fugitive emissions by using data from process flow diagrams. This method can be used to quantify the level of risk from a process or to compare alternative processes. Hassim and Hurme (2010c) The Occupational Health Index (OHI) was developed for assessment during the basic engineering stage. “This method relies on the information available in piping and instrumentation diagrams and the plot plan.” The health aspects considered are chronic and acute inhalation risks, and dermal/eye risk. Hassim and Hurme (2010d) This method estimates inhalation exposures and risks and can be used early in the design stages by utilizing process flow diagrams. The risk of chemical exposure can be evaluated through either the “hazard quotient method or calculating the carcinogenic chemicals intake and the resulting risk of cancer.”

The Use and Storage of Methyl Isocyanate (MIC) at Bayer CropScience Copyright National Academy of Sciences. All rights reserved. THE CONCEPTS OF INHERENTLY SAFER PROCESSES AND ASSESSMENT 73 Reference Contribution Hassim and Edwards (2006) Process Route Healthiness Index (PRHI) for quantification of health hazards arising from alternative chemical process routes. Application is in early stages of chemical plant design. Hurme and Rahman (2005) Discussion of implementation of inherent safety throughout process life-cycle phases. Use of ISI developed earlier. Khan and Amyotte (2004) Integrated Inherent Safety Index (I2SI). Khan and Amyotte (2005) Further development of I2SI to include cost model. Kossoy et al. (2007) Use of nonlinear optimization method to select inherently safer operational parameters for given configuration of reactor equipment and materials. Primary concern is cooling failure. Landucci et al. (2007) Procedure and indexes for evaluating inherent safety at preliminary process flow diagram (PFD) stage for hydrogen storage options. Landucci et al. (2008) Further development of PFD method (Landucci et al., 2007) by use of quantitative key performance indicators (KPIs) to remove subjective judgment. Leong and Shariff (2008) Further development of iRET (Shariff et al., 2006) to incorporate a quantitative inherent safety level (ISL), thus enabling integration of design simulation software with an Inherent Safety Index Module (ISIM). Application is again at the preliminary design stage. Leong and Shariff (2009) Evolution of ISIM (Leong and Shariff, 2008) to a Process Route Index (PRI) for comparison and ranking of different routes to manufacture the same product based on hazard potential of routes. Meel and Seider (2005) Use of game theory to achieve inherently safer operation of chemical reactors. Palaniappan et al. (2002a) “Methodology for the integrated inherent safety and waste minimization analysis during process design.” Palaniappan et al. (2002b) Indexing procedure for inherent safety analysis at process route selection stage. Palaniappan et al. (2002c) Indexing procedure for inherent safety analysis at process flowsheet development stage. Discussion of iSafe, an expert system for automating procedures developed by Palaniappan et al. (2002b,c). Rahman et al. (2005) Comparative evaluation of three ISIs with expert judgment at process concept phase. Rusli and Shariff (2010) This paper presents the Qualitative Assessment for Inherently Safer Design (QAISP) method for application during preliminary design. This qualitative method combines hazard review techniques with inherently safer design concepts to generate inherently safer plant options/proactive measures. Shah et al. (2003) SREST (substance, reactivity, equipment, and safety technology) layer assessment method for environment, health, and safety (EHS) aspects in early phases of chemical process design. TABLE 4.1  Continued continued

The Use and Storage of Methyl Isocyanate (MIC) at Bayer CropScience Copyright National Academy of Sciences. All rights reserved. 74 USE AND STORAGE OF METHYL ISOCYANATE (MIC) AT BAYER CROPSCIENCE Reference Contribution Shariff and Leong (2009) This paper proposes a method of evaluating inherent risk within a process as a result of the chemicals used and the process conditions. Through integration with HYSYS, the method can be used as early as the initial design stages to determine the probability and consequence of possible risk due to major accidents. Shariff and Zaini (2010) This paper reports on the development of Toxic Release Consequence Analysis Tool (TORCAT), a “tool for consequence analysis and design improvement via inherent safety principle by utilizing an integrated process design simulator with toxic release consequence analysis model.” Shariff et al. (2006) Integrated Risk Estimation Tool (iRET) for inherent safety application at preliminary design stage. iRET links the design simulation software HYSYS with an explosion consequence model. Srinivasan and Kraslawski (2006) Application of TRIZ methodology for creative problem solving to design of inherently safer chemical processes. Srinivasan and Nhan (2008) Inherent Benign-ness Indicator (IBI), a statistical-analysis- based method for comparing alternative chemical process routes. Tugnoli et al. (2009) A quantitative inherent safety assessment method is presented. This method utilizes process flow diagrams in early design stages. The result of the assessment is a quantification of the inherent safety of the process scheme by a set of key performance indicators. SOURCE: Adapted from Kletz and Amyotte (2010) and supplemented with additional citations from the literature from late 2009-2010. TABLE 4.1  Continued • Many of the methods deal specifically with the early concept and route- selection stages of the design process. • Some of the approaches use sophisticated mathematical and problem- solving techniques such as fuzzy logic. • There has been a growing trend to link inherent safety with environmental and health issues in an effort to achieve an integrated approach. • There have been attempts to incorporate inherent safety assessment into process design simulators, and these efforts should be encouraged. • Some of the indexing methods have been in existence long enough for comparative evaluations to be made among them. When commenting in 2005 on potential barriers to wider adoption of inher- ently safer design principles in the process industries, Edwards (2005) noted that the issue may not be the availability of ISP assessment tools but rather the limited use of these tools by industry. Reasons might include the subjective judgment

The Use and Storage of Methyl Isocyanate (MIC) at Bayer CropScience Copyright National Academy of Sciences. All rights reserved. THE CONCEPTS OF INHERENTLY SAFER PROCESSES AND ASSESSMENT 75 required by some of these tools and also their attendant complexity (Kletz and Amyotte, 2010). In 2011, it appears that the same availability of tools, yet limited uptake by industry, exists. Additional concerns surround the incorporation of ISP and PSM analysis into the business decisions a company must make. This is discussed in greater detail in Chapter 6. Another approach that considers some important aspects of ISP, is conse- quence analysis of potential incidents. Estimates of the potential impact of an incident will include evaluation of the effect of inventory of hazardous material, flammable and toxic properties, plant operating temperatures and pressures, plant location, and other factors. Designers considering ISP alternatives for a process can model consequences associated with potential design options and understand whether the proposed ISP options have a significant impact on incident conse- quences. However, modeling and evaluating potential probabilities and impacts of system failures (worst-case accidents) can present their own challenges, espe- cially with regards to modeling human behavior. This can lead to flawed evalu- ations in terms of emergency response and risk communication needs. This is described in greater detail in Box 4.2. BOX 4.2 ISP and Probability Safety Analysis

Assessments about the safety of systems comprising conventional ­active, passive, and procedural controls are typically based on probabi­ listic safety analyses (PSAs) that estimate the probability of a worst-case accident from three inputs. These are (1) a probabilistic safety model (e.g., a mathematical model such as a fault tree or event tree) that iden­ tifies the events, such as process component and engineering safety feature (ESF) failure, that are required to produce a release; (2) the esti­ mated probabilities of those events; and (3) the logical interrelationships among those events. The probabilistic safety model is used to combine the estimated probabilities of the individual events (component or ESF failure) to produce the estimated probability of the worst-case accident.

Once a probabilistic safety model has been developed, it can be used to compare the accident probabilities associated with different plant/process designs. Ultimately, the mathematical model is often used to determine when the probability of the worst-case accident has been decreased to a level that is acceptable to plant management. However, it is important to recognize that any mathematical model is a simplifica­ tion of reality that ignores factors the analyst considers to have minimal effects on the probability of an offsite release. In addition, probabilistic continued

The Use and Storage of Methyl Isocyanate (MIC) at Bayer CropScience Copyright National Academy of Sciences. All rights reserved. 76 USE AND STORAGE OF METHYL ISOCYANATE (MIC) AT BAYER CROPSCIENCE safety models sometimes ignore factors for which there are no available data or for which there is no established procedure for including them in the analysis.

One common problem in probabilistic safety models is that they are applied to systems composed of both people and technical systems but only the technical (equipment) components are modeled. This problem is being addressed in techniques that address human reliability (e.g., Swain and Guttman, 1983; Gertman et al., 2005; Spurgin, 2010) but human reliability is not always considered in plant PSAs.

Another common problem in probabilistic safety models is that the builders of the model often assume that the events in the model are independent. This assumption is violated when a common cause can fail multiple process components or ESFs, such as when an earthquake simultaneously fails a pipe carrying a toxic chemical, the secondary con­ tainment for that pipe, the flare tower, and the water curtain. Less obvi­ ously, the independence assumption is violated when a single operator fails to properly control multiple ESFs, a single maintenance person fails to properly maintain multiple ESFs, a single manager fails to properly supervise multiple operators or maintainers, or when an organizational unit’s safety culture tolerates inadequate performance. Such dependen­ cies could be included in the model, but often this is not done.

The neglect of human reliability and event dependence in probabilistic safety models leads to systematic underestimates of incident probabili­ ties. However, such underestimates will not create significant problems when two system designs being compared that are very similar in their susceptibility to human error and common-cause failures. This is be­ cause in such cases comparison of similar system designs by subtraction of the failure probability of one system from the failure probability of the other yields the correct difference even if both of the absolute estimates are biased. For example, suppose the estimated failure probability for System 1 is PE1 (which equals PT1 - PB, where PT1 is the true failure probability for System 1 and PB is the bias due to omitted error causes) and, similarly, the estimated failure probability for System 2 is PE2 (which equals PT2 - PB, where PT2 is the true failure probability for System 2 and PB is again the bias due to omitted error causes). The difference between the estimated failure probabilities for the two systems is unbiased as long as the omitted error causes are the same in both systems because PE2 - PE1 = (PT2 - PB) – (PT1 - PB) = PT2 - PT1. The difference between the estimated failure probabilities for the two systems is unbiased as long as the omitted error causes are the same in both systems because PE2 - PE1 = (PT2 - Pe) – (PT1 - Pe) = PT2 - PT1. By contrast, the absolute esti­ BOX 4.2 Continued

The Use and Storage of Methyl Isocyanate (MIC) at Bayer CropScience Copyright National Academy of Sciences. All rights reserved. THE CONCEPTS OF INHERENTLY SAFER PROCESSES AND ASSESSMENT 77 mates of failure probability (i.e., the differences of PE2 and PE1 from zero) are biased to the extent that failure causes have been omitted from the probabilistic safety model. This illustration explains why it is so important to compare probabilistic safety analyses of (relatively) similar systems and to be very skeptical of estimates of absolute failure probabilities. Unless the failure modes for both systems are identical, the bias in each estimate may not be the same in which case the probability models may not be useful even for comparing alternative systems unless they are corrected to account for common-cause failures and human errors.

One consequence of underestimating the failure probability of a con­ ventional system of active, passive, and procedural controls is that such underestimates make ISP strategies seem to be less advantageous than they would be if the failure probability of a conventional system of active, passive, and procedural controls were accurately estimated. If the magnitude of the underestimate were known to be small, then there would be little reason to be concerned about it. However, the magnitude of the under­estimate is not known, but the evidence from published post­ accident investigations suggests that it might be sufficiently large that conventional strategies of active, passive, and procedural controls are being chosen in situations where ISP strategies might produce signifi­ cantly greater levels of safety at reasonable cost. To avoid this problem of underestimation, PSAs need to more carefully consider human reliability, common-cause errors and, in particular, organizational safety culture.

Another consequence of underestimating the failure probability of a conventional system of active, passive, and procedural controls is that such underestimates can lead to a neglect of offsite emergency ­response and emergency preparedness because of the belief that they are ­unnecessary. Consequently, plant personnel have insufficient famil­ iarity with offsite agencies emergency plans and procedures to work effectively with them when emergencies occur. This can lead to major problems in the implementation of warning and protective actions (shelter in place or evacuation) of nearby residents.

Finally, underestimating the failure probability of a conventional sys­ tem of active, passive, and procedural controls hinders risk communica­ tion with other stakeholders. In many cases, community groups focus on the worst-case accident and have relatively little interest about the estimated probability of that event. By contrast, plant personnel typically focus on the (estimated) low probability of a worst-case accident and believe that this justifies a low priority for what they consider to be only marginally greater safety at significantly greater cost. The disagreements are likely to be particularly acute if community groups mistrust plant management and, thus, have low confidence in the effectiveness of a conventional system of active, passive, and procedural controls.

The Use and Storage of Methyl Isocyanate (MIC) at Bayer CropScience Copyright National Academy of Sciences. All rights reserved. 78 USE AND STORAGE OF METHYL ISOCYANATE (MIC) AT BAYER CROPSCIENCE REFERENCES Adu, I. K., H. Sugiyama, U. Fischer, and K. Hungerbuhler. 2008. Comparison of methods for assess- ing environmental, health and safety (EHS) hazards in early phases of chemical process design. Process Saf. Environ. Protect. 86(3):77-93. Al-Mutairi, E. M., J. A. Suardin, S. M. Mannan, and M. M. El-Halwagi. 2008. An optimization ap- proach to the integration of inherently safer design and process scheduling. J. Loss Prevent. Proc. Ind. 21(5):543-549. Amyotte, P. R., A. U. Goraya, D. C. Hendershot, and F. I. Khan. 2006. Incorporation of inherent safety principles in process safety management. Pp. 175-207 in 21st Annual Center for Chemical Process Safety International Conference on Process Safety Challenges in a Global Economy. New York: American Institute of Chemical Engineers. Ashford, N. A. 1993. The Encouragement of Technological Change for Preventing Chemical Ac- cidents: Moving Firms From Secondary Prevention and Mitigation to Primary Prevention. Cambridge, MA: Center for Technology, Policy and Industrial Development, Massachusetts Institute of Technology. Berger, S. A., and R. J. Lantzy. 1996. “Reducing Inherent Risk Through Consequence Modeling.”1996 Process Plant Safety Symposium, ed. Hatice Cullingford, 15-23. Houston, TX: South Texas Sec- tion of the American Institute of Chemical Engineers. Atherton, J., and F. Gil. 2008. Incidents that Define Process Safety. Hoboken, NJ: Wiley. Bollinger, R. E., D. G. Clark, R. M. Dowell, R. M. Ewbank, D. C. Henershot, W. K. Lutz, S. I. Meszaros, D. E. Park, and E. D. Wixom. 1996. Inherently Safer Chemical Processes: A Life Cycle Approach. New York: Center for Chemical Process Safety of American Institute of Chemical Engineers. Carvalho, A., R. Gani, and H. Matos. 2008. Design of sustainable chemical processes: System- atic retrofit analysis generation and evaluation alternatives. Process Saf. Environ. Protect. 86(5):328-346. CCPS (Center for Chemical Process Safety). 1998. Guidelines for Design Solutions for Process Equipment Failures. Hoboken, NJ: Wiley. CCPS. 2008. Guidelines for Hazard Evaluation Procedures, 3rd Ed. Hoboken, NJ: Wiley. CCPS. 2009. Inherently Safer Chemical Processes: A Life Cycle Approach, 2nd Ed. Hoboken, NJ: Wiley CCPS. 2010. Final Report: Definition for Inherently Safer Technology in Production, Transportation, Storage, and Use. Prepared by Center for Chemical Process Safety, The American Institute of Chemical Engineers, for U.S. Department of Homeland Security, Science & Technology, Chemical Security Analysis Center, Aberdeen Proving Ground, MD. July 19 [online]. Avail- able: http://www.aiche.org/uploadedFiles/CCPS/Resources/KnowledgeBase/IST%20Final%20 Definition%20Report.pdf. Accessed Sept. 23, 2011. Conta Costa Health Services. 1999. County Ordinance Chapter 450-8: Industrial Safety Ordi- nance. Contra Costa County, California [online]. Available: http://cchealth.org/groups/hazmat/ industrial_safety_ordinance.php. Accessed: Sept. 23, 2011. Cordella, M., A. Tugnoli, F. Barontini, G. Spadoni, and V. Cozzani. �����������������������������

  1. Inherent safety of sub-

stances: Identification of accidental scenarios due to decomposition products. J. Loss Prevent. Proc. Ind. 22(4):455-462. Cozzani, V., F. Barontini, and S. Zanelli. 2006. Assessing the inherent safety of substances: precursors of hazardous products in the loss of control of chemical systems. In 06 AIChe: Proceedings of American Institute of Chemical Engineers Spring National Meeting, April 23-27, 2006, Orlando, FL. New York: American Institute of Chemical Engineers. DHS (U.S. Department of Homeland Security). 2010. Final Report: Definition For Inherently Safer Technology in Production, Transportation, Storage, and Use. Prepared by CCPS for U.S. DHS. July 2010.

The Use and Storage of Methyl Isocyanate (MIC) at Bayer CropScience Copyright National Academy of Sciences. All rights reserved. THE CONCEPTS OF INHERENTLY SAFER PROCESSES AND ASSESSMENT 79 Doran, P., and T. R. Greig. 1993. Mond Index: How to Identify, Assess and Minimise Potential Haz- ards on Chemical Plant Units for New and Existing Processes, 2nd Ed. Northwich: Imperial Chemical Industries. Dow (Dow Chemical Company). 1994a. Dow’s Fire and Explosion Index Hazard Classification Guide, 7th Ed. New York: American Institute of Chemical Engineers. Dow. 1994b. Dow’s Chemical Exposure Index, 1st Ed. New York: American Institute of Chemical Engineers. Edwards, D. W. 2005. Are we too risk-averse for inherent safety? An examination of current status and barriers to adoption. Process Saf. Environ. Protect. 83(2):90-100. Edwards, D. W., and D. Lawrence. 1993. Assessing the inherent safety of chemical process routes. Process Saf. Environ. Protect. 71(B4):252-258. Edwards, D. W., A. G. Rushton, and D. Lawrence. 1996. Quantifying the Inherent Safety of Chemi- cal Process Routes. Paper presented at the 5th World Congress of Chemical Engineering, July 14-18, 1996, San Diego, CA. Englund, S. M. 1991. Design and operate plants for inherent safety—Part 2. Chem. Eng. Prog. (May):79-86. Englund S. M. 1991. Design and operate plants for inherent safety—Part 1. Chem. Eng. Prog. (March):85-91. Englund, S. M. 1993. “Process and Design Options for Inherently Safer Plants.” Prevention and Control of Accidental Releases of Hazardous Gases, ed. Vasilis M. Fthenakis, 9-62. New York: Van Nostrand Reinhold. Englund, S. 2007. Safety condition in chemical process industries. Pp. 83-146 in Kent and Riegel’s Handbook of Industrial Chemistry and Biotechnology, Vol. 1, ed. J. A. Kent. New York: Springer. EPA (U.S. Environmental Protection Agency). 1987. Technical Guidance for Hazards Analysis: Emer- gency Planning for Extremely Hazardous Substances. U.S. Environmental Protection Agency, Federal Emergency Management Agency, U.S. Department of Transportation. December [on- line]. Available: http://www.epa.gov/osweroe1/docs/chem/tech.pdf. Accessed: Oct. 4, 2011. Etowa, C. B., P. R. Amyotte, M. J. Pegg, and F. I. Khan. 2002. Quantification of inherent safety aspects of the Dow indices. J. Loss Prevent. Proc. Ind. 15(6):477-487. French, R. W., D. D. Williams, and E. D. Wixom. “Inherent Safety, Health and Environmental (SHE) Reviews.” Proceedings of the 29th Annual Loss Prevention Symposium, ed. Everett D. Wixom and Robert P. Benedetti, Paper 1c. New York: American Institute of Chemical Engineers, 1995. Gentile, M., W. J. Rogers, and M. S. Mannan. 2003. Development of a fuzzy logic-based inherent safety index. Process Saf. Environ. Protect. 81(6):444-456. Gertman, D., H. Blackman, J. Marble, J. Byers, and C. Smith. 2005. The SPAR-H Human Reliability Analysis Method. NUREG/CR-6883. Idaho National Laboratory. Rockville, MD: U.S. Nuclear Regulatory Commission [online]. Available: http://www.nrc.gov/reading-rm/doc-collections/ nuregs/contract/cr6883/cr6883.pdf. Accessed: Feb. 15, 2012. Gowland, R. T. 1995. “Applying Inherently Safer Concepts to an Acquisition Which Handles Phosgene.”Proceedings of the 29th Annual Loss Prevention Symposium, ed. Everett D. Wixom and Robert P. Benedetti, Paper No. 1d. New York: American Institute of Chemical Engineers. Gupta, J. P., and D. W. Edwards. 2003. A simple graphical method for measuring inherent safety. J. Hazard. Mater. 104(1-3):15-30. Hassim, M. H., and D. W. Edwards. 2006. Development of a methodology for assessing inherent occupational health hazards. Process Saf. Environ. Protect. 84(5):378-390. Hassim, M. H., and M. Hurme. 2010a. Inherent occupational health assessment during basic engineer- ing stage. J. Loss Prevent. Proc. Ind. 23(2):260-268. Hassim, M. H., and M. Hurme. 2010b. Inherent occupational health assessment during preliminary design stage. J. Loss Prevent. Proc. Ind. 23(3):476-482. Hassim, M. H., and M. Hurme. 2010c. Inherent occupational health assessment during process re- search and development stage. J. Loss Prevent. Proc. Ind. 23(1):127-138.

The Use and Storage of Methyl Isocyanate (MIC) at Bayer CropScience Copyright National Academy of Sciences. All rights reserved. 80 USE AND STORAGE OF METHYL ISOCYANATE (MIC) AT BAYER CROPSCIENCE Hassim, M. H., and M. Hurme. 2010d. Occupational chemical exposure and risk estimation in process development and design. Process Saf. Environ. Protect. 88(4):225-235. Hendershot, D.C. 2003. Inherently Safer Design. SACHE Faculty Workshop, September 2003, Baton Rouge, LA [online]. Available: http://static.scribd.com/docs/io019xho1iqpt.txt. Accessed: Sept. 27, 2011. Hendershot, D. C. 2006. An overview of inherently safer design. Process Saf. Prog. 25(2):98-107. Hendershot, D. C. 2010a. A summary of inherently safer technology. Process Saf. Prog. 29(4):389-392. Hendershot, D. C. 2010b. Inherently safer technology. J. Chem. Health Saf. 17(2):29-30. Hendershot, D. C. 2011a. Defining inherently safer technology. J. Chem. Health Saf. 18(1):46-47. Hendershot, D. C. 2011b. Inherently Safer Design: An Overview of Key Elements. All Business com [online]. Available: http://www.allbusiness.com/safety-accidents-disasters/accidents-chem- ical/15519792-1.html#ixzz1Y7Tswa3b. Accessed: Sept. 27, 2011. Hendershot, D. C., and S. Berger. 2006. Inherently Safer Design and Chemical Plant Security and Safety. Prepared for submission to the U.S. Senate Environment and Public Works Committee, June 21, Washington, DC [online]. �������������������������������������������������������� Available: http://epw.senate.gov/109th/Hendershot_Testi- mony.pdf. Accessed: Sept. 27, 2011. Horng, J-J., Y-S. Lin, C-M. Shu, and E. Tsai. (2005). Using consequence analysis on some chlorine operation hazards and their possible effects on neighborhoods in central Taiwan. J. Loss Prevent. Proc. Ind. 18:474-480. Hurme, M., and M. Rahman. 2005. Implementing inherent safety throughout process lifecycle. J. Loss Prevent. Proc. Ind. 18(4-6):238-244. Khan, F. I., and P. R. Amyotte. 2003. How to make inherent safety practice a reality. Can. J. Chem. Eng. 81(1):2-16. Khan, F. I., and P. R. Amyotte. 2004. Integrated inherent safety index (I2SI): A tool for inherent safety evaluation. Process Saf. Prog. 23(2):136-148. Khan, F. I., and P. R. Amyotte. 2005. I2SI: A comprehensive quantitative tool for inherent safety and cost evaluation. J. Loss Prevent. Proc. Ind. 18(4-6):310-326. Khan, F. I., R. Sadiq, and P. R. Amyotte. 2003. Evaluation of available indices for inherently safer design options. Process Saf. Prog. 22(2):83-97. Kletz, T. A. 1978. “What you don’t have, can’t leak.” Chem. Ind. (May 6):287-292. Kletz, T. A. 1984. Cheaper, Safer Plants, or Wealth and Safety at Work: Notes on Inherently Safer and Simpler Plants. Rugby, Warwickshire, UK: The Institution of Chemical Engineers. Kletz, T. A. 1985. Inherently safer plants. Plant/Operations Progress. 4(3):164-167. Kletz, T. A. 1991. Plant Design for Safety: A User-Friendly Approach. New York: Hemisphere Pub. Kletz, T. A. 1996. Inherently safer design: The growth of an idea. Process Saf. Prog. 15(1):5-8. Kletz, T. A. 1998. Process Plants: A Handbook for Inherently Safer Design. Philadelphia: Taylor & Francis. Kletz, T. A., and P. Amyotte. 2010. Process Plants: A Handbook for Inherently Safer Design, 2nd Ed. Boca Raton, FL: CRC Press. Kossoy, A., A. Benin, and Yu. Akhmetshin. 2007. Simulation-based approach to design of inherently safer processes. In Loss Prevention 2007: 12th International Symposium on Loss Prevention and Safety Promotion in the Process Industries. Rugby, UK: IChemE. Landucci, G., A. Tugnoli, C. Nicolella, and V. Cozzani. ���������������������������������������������

  1. Assessment of inherently safer technol-

ogies for hydrogen storage. Pp. 1191-1196 in Loss Prevention 2007: 12th International Sympo- sium on Loss Prevention and Safety Promotion in the Process Industries. Rugby, UK: IChemE. Landucci, G., A. Tugnoli, and V. Cozzani. ��������������������������������������������������������

  1. Inherent safety key performance indicators for hy-

drogen storage systems. J. Hazard. Mater. 159(2-3):554-566. Landucci, G., A. Tugnoli, C. Nicolella, and V. Cozzani. ���������������������������������������������

  1. Assessment of inherently safer technol-

ogies for hydrogen storage. Pp. 1191-1196 in Loss Prevention 2007: 12th International Sympo- sium on Loss Prevention and Safety Promotion in the Process Industries. Rugby, UK: IChemE.

The Use and Storage of Methyl Isocyanate (MIC) at Bayer CropScience Copyright National Academy of Sciences. All rights reserved. THE CONCEPTS OF INHERENTLY SAFER PROCESSES AND ASSESSMENT 81 Leong, C. T., and A. M. Shariff. 2008. Inherent safety index module (ISIM) to assess inherent safety level during preliminary design stage. Process Saf. Environ. Protect. 86(2):113-119. Leong, C. T., and A. M. Shariff. 2009. Process route index (PRI) to assess level of explosiveness for inherent safety quantification. J. Loss Prevent. Proc. Ind. 22(2):216-221. Lin, D., A. Mittelman, V. Halpin, and D. Cannon. 1994. Inherently Safer Chemistry: A Guide to Cur- rent Industrial Processes to Address High Risk Chemicals. Washington, DC: Office of Pollution Prevention and Toxics, U.S. Environmental Protection Agency. Lindell, M. K., and Perry, R. W. (2006). Onsite and offsite emergency preparedness. Pp. 1959-1971 in S. Lee. (Ed.) Encyclopedia of Chemical Processing. New York: Marcel Dekker. Mannan, S., ed. 2005. Lee’s Loss Prevention in the Process Industries, 3rd Ed. Oxford, UK: Elsevier Butterworth-Heinemann. Mansfield, D. P., R. D. Turney, R. L. Rogers, M. Verwoerd, and P. Bots. “How to Integrate Inherent SHE in Process Development and Plant Design.”IChemE Conference, Major Hazards Onshore and Offshore 1995. Manuele. F. A. 2003 On the Practice of Safety. Hoboken, NJ: John Wiley & Sons. Meel, A., and W. D. Seider. 2005. Dynamic risk assessment of inherently safe chemical processes: Ac- cident precursor approach. In 2005 Spring National Meeting Conference Proceedings, Atlanta, GA. New York: American Institute of Chemical Engineers. Mulhern, B. 2008. Up on green roofs. Turf Magazine, January [online]. Available: http://www.turf magazine.com/article-192.aspx. Accessed Sept. 27, 2011. NJ DEP (New Jersey Department of Environmental Protection). 2009. News about the TCPA Pro- gram: Toxic Catastrophe Prevention Act (TCPA) TCPA 13:1K-24, March 16 [online]. Available: http://www.state.nj.us/dep/rpp/brp/tcpa/tcpanews.htm. Accessed: Sept. 23, 2011. Palaniappan, C., R. Srinivasan, and I. Halim. 2002a. A material-centric methodology for develop- ing inherently safer environmentally benign processes. Comput. Chem. Eng. 26(4-5):757-774. Palaniappan, C., R. Srinivasan, and R. Tan. 2002b. Expert system for the design of inherently safer processes. 1. Route selection stage. Ind. Eng. Chem. Res. 41(26):6698-6710. Palaniappan, C., R. Srinivasan, and R. Tan. 2002c. Expert system for the design of inherently safer processes. 2. Flowsheet development stage. Ind. Eng. Chem. Res. 41(26):6711-6722. Puranik, S. A., K. K. Hathi, and R. Sengupta. “Prevention of Hazards Through Technological Alternatives.”Safety and Loss Prevention in the Chemical and Oil Processing Industries, 581-

  1. IChemE Symposium Series, no. 120. Rugby, Warwickshire, UK: The Institution of Chemical

Engineers, 1990. Rahman, M., A. M. Heikkila, and M. Hurme. 2005. Comparison of inherent safety indices in process concept evaluation. J. Loss Prevent. Proc. Ind. 18(4-6):327-334. Rogers, R. L., and S. Hallam. 1991. “A Chemical Approach to Inherent Safety.” IChemE Symposium Series No. 124:235-241. Rogers, R. L., D. P. Mansfield, Y. Malmen, R. D. Turney, and M. Verwoerd. 1995. The INSIDE project: Integrating inherent safety in chemical process development and plant design. In Inter- national Symposium on Runaway Reactions and Pressure Relief Design, ed. G. A. Melhem and Harold G. Fisher, 668-89. New York: American Institute of Chemical Engineers. Rusli, R., and A. M. Shariff. 2010. Qualitative assessment for inherently safer design (QAISP) at preliminary design stage. J. Loss Prevent. Proc. Ind. 23(1):157-165. Scheffler, N. E. 1995. Inherently safer latex plants. In Proceedings of the 29th Annual Loss Preven- tion Symposium, ed. Everett D. Wixom and Robert P. Benedetti, Paper 1b. New York: American Institute of Chemical Engineers. Shah, S., U. Fischer, and K. Hungerbuhler. 2003. A hierarchical approach for the evaluation of chemical process aspects from the perspective of inherent safety. Process Saf. Environ. Protect. 81(6):430-443. Shariff, A. M., and C. T. Leong. 2009. Inherent risk assessment—A new concept to evaluate risk in preliminary design stage. Process Saf. Environ. Protect. 87(6):371-376.

The Use and Storage of Methyl Isocyanate (MIC) at Bayer CropScience Copyright National Academy of Sciences. All rights reserved. 82 USE AND STORAGE OF METHYL ISOCYANATE (MIC) AT BAYER CROPSCIENCE Shariff, A. M., and D. Zaini. 2010. Toxic release consequence analysis tool (TORCAT) for inherently safer design plant. J. Hazard. Mater. 182(1-3):394-402. Shariff, A. M., R. Rusli, C. T. Leong, V. R. Radhakrishnan, and A. Buang. 2006. Inherent safety tool for explosion consequences study. J. Loss Prevent. Proc. Ind. 19(5):409-418. Sorensen, J. H., Shumpert, B. L. and. Vogt, B. M. (2004). Planning for protective action decision making: evacuate or shelter-in-place. J. Hazard. Mater. A109, 1-11. Spurgin, A. J. (2010). Human Reliability Assessment: Theory and Practice. Boca Raton: CRC Press. Srinivasan, R., and A. Kraslawski. 2006. Application of the TRIZ creativity enhancement approach to design of inherently safer chemical processes. Chem. Eng. Process. 45(6):507-514. Srinivasan, R., and N. T. Nhan. 2008. A statistical approach for evaluating inherent benign-ness of chemical process routes in early design stages. Process Saf. Environ. Protect. 86(3):163-174. Swain, A. D., and H. E., Guttmann. 1983. Handbook on Human Reliability Analysis with Emphasis on Nuclear Power Plant Application. NUREG/CR-1278. SAND 80-0200 RX, AN. Final Report. Rockville, MD: U.S. Nuclear Regulatory Commission. Tugnoli, A., G. Landucci, and V. Cozzani. ���������������������������������������������������������

  1. Key performance indicators for inherent safety: Ap-

plication to the hydrogen supply chain. Process Saf. Prog. 28(2):156-170. U.S. Department of Labor. Occupational Health and Safety Administration. Process safety man- agement of highly hazardous chemical. (29 CFR § 1910.119) [online]. Available at http:// www.osha.gov/pls/oshaweb/owadisp.show_document?p_table=STANDARDS&p_id=9760. Ac- cessed: April 6, 2011. Van Willigen, M., T. Edwards, B. Edwards, and S. Hessee. 2002. Riding out the storm: The experi- ences of the physically disabled during Hurricanes Bonnie, Dennis, and Floyd. Natural Hazards Review 3(3):98-106. Windhorst, J. C. A. 1995. Application of inherently safe design concepts, fitness for use and risk driven design process safety standards to an LPG project. In Loss Prevention and Safety Pro- motion in the Process Industries, ed. J. J. Mewis, Hans J. Pasman, and E. E. De Rademacker, 543-54. Amsterdam: Elsevier Science B. V.

The Use and Storage of Methyl Isocyanate (MIC) at Bayer CropScience Copyright National Academy of Sciences. All rights reserved. 5 MIC and Pesticide Production at the Institute Plant: Alternatives Assessment INTRODUCTION In this chapter, possible alternative methods for production of methyl iso- cyanate (MIC) and carbamate pesticides at the Bayer CropScience facility are presented. This chapter directly addresses Tasks 2 and 3.1 of the committee’s statement of task. Before beginning, however, it is important to address two points. First, when the committee began its work, there was an assumption that Bayer CropScience would be restarting production of MIC and the carbamate pesticides. Were that to be done, then a “[r]eview [of] current and emerging technologies for producing carbamate pesticides, including carbaryl, aldicarb, and related compounds.” (SOT, Task 2) would potentially have value for the company. During the course of the study, however, Bayer CropScience (Bayer) announced they would not be restarting production of MIC. This was based on a combination of the factors described in Chapters 1 and 3 including deregistration of aldicarb, carbosulfan, and carbofuran with the U.S. Environmental Protection Agency (EPA) and the continued economic viability of the other pesticides manu- factured at the facility. In light of these changes, the committee determined that an in-depth review of the field as a whole would provide little value to the sponsor or the reader beyond what a targeted review of processes considered by Bayer and the legacy owners of the facility would provide. Thus, the analyses presented in this chapter focus on those processes identified by the current and former owners as most likely to meet the manufacturing needs of the Institute facility. Second, the process assessments presented here may be incomplete because the analysis is based in large part on materials provided by Bayer CropScience that were generated by former site owners, primarily Rhône-Poulenc. At the first 83

The Use and Storage of Methyl Isocyanate (MIC) at Bayer CropScience Copyright National Academy of Sciences. All rights reserved. 84 USE AND STORAGE OF METHYL ISOCYANATE (MIC) AT BAYER CROPSCIENCE meeting of the committee, Dr. Steven Smythe speaking on behalf of the company, stated that 29 routes to MIC production had been identified, and four had been evaluated in greater detail. Although the materials relating to the alternatives and their evaluation were provided to the committee for review in good faith, the documentation was rather disjointed and discontinuous, with documents rang- ing from undated handwritten notes without attribution to in-depth typewritten analyses of findings. Therefore, the process assessments presented here are drawn from docu- ments provided by Bayer and from the current academic and patent literature. Information gaps within the historic documents could result in gaps within these assessments. ALTERNATIVES ASSESSMENT In considering the adoption of a new or redesigned process, it is helpful to break down the impact that the proposed redesign would have on the elements outlined in Chapter 4, namely selection of basic technology, implementation of the selected technology, plant design, detailed equipment design, and impact on operations. The options facing the facility’s owners—Bayer CropScience today and the legacy companies in the past—were (1) continuing with the existing pro- cess, (2) adopting an alternative chemical process not involving MIC, (3) using an alternative process involving MIC production that would consume MIC immedi- ately (just-in-time) and thus not require storage, and (4) reducing the volume of stored MIC and the risks of transporting MIC from one facility within the site to another by rearranging process equipment. Each of these has implications for the facility as a whole, and the technical considerations for them are presented below. However, a key motivation for this NRC study is to evaluate whether Bayer could have identified a superior process for manufacturing pesticides at the Institute facility that would have reduced risks to the surrounding communities. Any potential changes proposed by Bayer CropScience were compared to the processes in place in 2008, referred to here as the “existing process,” for the chemistry and production methods in place at that time. Production of MIC There are a number of possible methods for production of MIC. This chemis- try has been used for decades, and much has been written about the possible paths for production. In light of Bayer’s decision to no longer produce or store large quantities of MIC onsite, a full evaluation of every possible alternative method of production is not presented here. Rather, this section describes four methods eval- uated by Bayer and previous owners of the facility. The evaluations of these processes and the role those evaluations played in Bayer’s decision making are described in Chapter 6.

The Use and Storage of Methyl Isocyanate (MIC) at Bayer CropScience Copyright National Academy of Sciences. All rights reserved. MIC AND PESTICIDE PRODUCTION AT THE INSTITUTE PLANT 85 In 2010, Bayer identified four alternative processes for generating MIC (referred to here as DuPont, cyanate, diphenylcarbonate, and Enichem) based in part on earlier evaluations conducted by prior owners of the Institute site. The company stated that data for their analyses were derived in part from the follow- ing sources (Smythe, 2011): • The Union Carbide Corporation (UCC) process. Current operating data and cost • DuPont. Stanford Research Institute Report and internal evaluation per- formed by Rhône-Poulenc • Cyanate. Patent literature between 1973 and 1985 • Diphenylcarbonate. Domagen operating costs and conditions between 1971 and 2002 • Enichem. Patent literature from 1975 and internal evaluation performed by Rhône-Poulenc All four of the processes generate MIC in a gaseous form, rather than a liq- uid form, which would have necessitated some adjustments to the downstream production processes at Institute to be used directly or incorporation of a recovery step to condense or capture liquid-phase MIC. In addition, none of the processes had been run at a scale similar to the existing MIC process at Institute. Note that all process flow diagrams below were provided by Bayer ­CropScience to the committee. The Union Carbide Corporation (UCC) Process in Institute The synthetic method for the production of MIC has remained largely unchanged since 1966, when production began in Institute. In this process, devel- oped by Union Carbide, phosgene (Cl2CO) and methyl amine (CH3NH2, MMA) are combined to form N-methyl carbamoyl chloride (C2H4NClO, MCC), from which hydrogen chloride (HCl) is eliminated to generate MIC. See Figure 5.1. The MCC generation takes place at high temperature and low pressure in a reactor with a specialized design that permits very fast reaction times and com- plete conversion of MMA to MCC, followed by a pyrolizer to split MCC into FIGURE 5.1  Synthesis of MIC from N-methyl carbomoyl chloride, as used at the Bayer CropScience facility.

The Use and Storage of Methyl Isocyanate (MIC) at Bayer CropScience Copyright National Academy of Sciences. All rights reserved. 86 USE AND STORAGE OF METHYL ISOCYANATE (MIC) AT BAYER CROPSCIENCE UCC Process via Mono-Methylamine (MMA) and Phosgene Methylamine (MMA) CO Cl2 MIC Waste water HCl Chloroform (TCM) MIC Reaction MIC Recovery Phosgene generation HCl Scrubber HCl Absorption Residue treatment TCM extraction Phosgene Recovery Waste water DMAC Recycle DMAC Recycle Phosgene Recycle UCC Process via Mono-Methylamine (MMA) and Phosgene Methylamine (MMA) CO Cl2 MIC Waste water HCl Chloroform (TCM) MIC Reaction MIC Recovery Phosgene generation HCl Scrubber HCl Absorption Residue treatment TCM extraction Phosgene Recovery Waste water DMAC Recycle DMAC Recycle Phosgene Recycle FIGURE 5.2  Process flow diagram for production of MIC via mono-methylamine and phosgene (UCC process). SOURCE: Smythe (2011). MIC and HCl. The pyrolizer has an inclined orientation to separate the HCl from the MIC, avoiding any re-formation of MCC. The process, as used at the Bayer CropScience facility, produced extremely pure MIC (99.9 percent), which was then stored in liquid form before being transferred for use in production of carba- mate pesticides. A diagram of the process and the equipment used for production of MIC is shown in Figure 5.2. DuPont Process In 1985, DuPont developed a methylformamide oxidation process to make its own MIC when the Union Carbide facility halted production following the Bhopal disaster (Carcia, 1984; Rao, 1985). The DuPont process combines monomethyl- amine and carbon monoxide to provide N-methylformamide (see Figure 5.3). The N-­methylformamide is then oxidized with oxygen/palladium (through an air intake) at very high temperatures to generate gaseous MIC and water. To prevent the MIC from reacting with the water, it is almost immediately fed into a process to produce methomyl and oxamyl carbamate pesticides. When Rhône-Poulenc considered the plausibility of developing this method for producing MIC at the Institute facility, concerns, such as whether downstream

The Use and Storage of Methyl Isocyanate (MIC) at Bayer CropScience Copyright National Academy of Sciences. All rights reserved. MIC AND PESTICIDE PRODUCTION AT THE INSTITUTE PLANT 87 pesticide production could continue with the vapor phase MIC or if recovery of liquid MIC was required, had to be considered. If the vapor phase could be used, then this process would have the advantage of using MIC as soon as it is produced (just-in-time production). DuPont’s production facility in LaPorte, Texas is able to use vapor phase MIC, so there is no MIC storage on site, and since it is pro- duced as a gas rather than a liquid, only a small amount of MIC is in the system at any given time. However, according to Bayer’s analysis, the concentration of impurities in the MIC generated using the DuPont process is higher than with the UCC process. Cyanate Process The cyanate process has been used in South Africa, and it is currently used as a method for making MIC in Asian countries. This method combines ­potassium or sodium cyanate and dimethyl sulfate in an aromatic solvent to generate MIC and potassium or sodium sulfate (See Figures 5.4 and 5.5). This is one of the earliest methods for synthesis of isocyanates reported in the literature, having been discovered by Alfred Wurtz in 1849. In contrast to the DuPont process, but similar to the UCC process, the cyanate process is a batch process and requires some capacity for storing MIC. The yield of MIC was reported in a patent awarded in 1980 as on the order of 80-85 percent relative to added potassium cyanate (Giesselmann et al., 1980). An important consideration any company contemplating adoption of this process is the amount of waste generated as a result of this reaction, which is roughly 1.5 kg of solid K2SO4 or Na2SO4 waste per kg of MIC produced. FIGURE 5.3  Synthesis of MIC from N-methylformamide, used by DuPont. FIGURE 5.4  Synthesis of MIC from sodium cyanate, used in the cyanate process.

The Use and Storage of Methyl Isocyanate (MIC) at Bayer CropScience Copyright National Academy of Sciences. All rights reserved. 88 USE AND STORAGE OF METHYL ISOCYANATE (MIC) AT BAYER CROPSCIENCE Sodium Cyanate Process via Dimethyl Sulfate (DMS) DMS Solvent (e.g.o-DCB) MIC Waste water NaOCN Residue MIC Reaction MIC Recovery Solvent drying Hydrolysis Organic stripping Solvent Recycle Na2CO3 water Vent FIGURE 5.5  Process flow diagram for production of methyl isocyanate via dimethyl sulfate and sodium cyanate (cyanate process). SOURCE: Smythe (2011). Bayer Diphenylcarbonate and Dimethylurea Process Bayer used a diphenylcarbonate process to make MIC at its Dormagen plant between 1971 and 2002, combining diphenylcarbonate with dimethylurea (Kober and Smith, 1968). In this method, the dimethylurea and diphenyl­carbonate are heated to form MIC and phenol via an exchange-replacement-elimination sequence (See Figure 5.6). The diphenylcarbonate process has the advantage of not requiring chlorine or phosgene as inputs, but it does generate large amounts of phenol, although this can be recovered by cooling the product mixture and recycling for use in the production of diphenylcarbonate. The diagram in Figure 5.7 shows the process. Enichem Diphenylcarbonate Process Enichem, a chemical company based in Europe, also had a process to make MIC that combined diphenylcarbonate with methylamine (Romano et al., 1984;

The Use and Storage of Methyl Isocyanate (MIC) at Bayer CropScience Copyright National Academy of Sciences. All rights reserved. MIC AND PESTICIDE PRODUCTION AT THE INSTITUTE PLANT 89 DPC DMU Diphyl MIC PhOH Residue Vent Reaction mixture MIC Recovery PhOH Recovery PhOH Storage MIC Reaction Bayer Process via Diphenylcarbonate (DPC) and Dimethylurea (DMU) DPC DMU Diphyl MIC PhOH Residue Vent Reaction mixture MIC Recovery PhOH Recovery PhOH Storage MIC Reaction Bayer Process via Diphenylcarbonate (DPC) and Dimethylurea (DMU) FIGURE 5.7  Process flow diagram for production of MIC via diphenylcarbonate and dimethylurea (Bayer diphenylcarbonate process). SOURCE: Smythe (2011). FIGURE 5.6  Synthesis of MIC from diphenylcarbonate and dimethylurea, used in the diphenylcarbonate process. Rivetti et al., 1987) (see Figure 5.8). As with Bayer’s diphenylcarbonate process, the Enichem diphenylcarbonate process is essentially a replacement-elimination reaction. The two reactants are mixed and heated to form N-methylcarbamate, also known as phenyl-N-methylurethane, and phenol. Further heating leads to the elimination of MIC and additional phenol. The mixture is then cooled to remove the phenol and remaining N-methylcarbamate allowing MIC to undergo addi- tional purification steps (see Figure 5.9). Because phenol is also a by-product of the Enichem reaction, manufacturers using this method must consider whether to dispose of or recycle this material.

The Use and Storage of Methyl Isocyanate (MIC) at Bayer CropScience Copyright National Academy of Sciences. All rights reserved. 90 USE AND STORAGE OF METHYL ISOCYANATE (MIC) AT BAYER CROPSCIENCE DPC Methylamine (MMA) Diphyl MIC PhOH Residue Vent NMC Reaction MIC Recovery PhOH Recovery PhOH Storage MIC Reaction Enichem Process via N-Methylcarbamate (NMC) DPC Methylamine (MMA) Diphyl MIC PhOH Residue Vent NMC Reaction MIC Recovery PhOH Recovery PhOH Storage

MIC Reaction

FIGURE 5.8  Synthesis of MIC from diphenylcarbonate and methylamine, used in Enichem diphenylcarbonate process. FIGURE 5.9  Process flow diagram for production of MIC via N-methylcarbamate (Enichem process). SOURCE: Smythe (2011). In the late 1980s, Rhône-Poulenc considered this option in great detail, including the manufacture of diphenylcarbonate onsite from dimethylcarbon- ate and phenol, which would negate the need for phosgene in the production of diphenylcarbonate. The company then engaged with Enichem to evaluate the feasibility of adopting and licensing this process from Enichem in Institute, West Virginia. Carbamate Pesticide Production MIC was produced at the Institute facility to act as a reactant in the synthesis of carbamate pesticides. In this section the focus is primarily on the possible tech-

The Use and Storage of Methyl Isocyanate (MIC) at Bayer CropScience Copyright National Academy of Sciences. All rights reserved. MIC AND PESTICIDE PRODUCTION AT THE INSTITUTE PLANT 91 nical alternatives for production of carbamate pesticides at the Institute facility. The assumption that carbamate production would continue was implicit in the Committee’s Statement of Task, which focused on identifying different technolo- gies for producing carbamate pesticides and possible approaches for reducing or eliminating the use of MIC in their production. A broader range of alternatives could be considered, including not making any carbamate pesticides, or even not making any pesticides at all, which reduce safety risks. However, such alterna- tives could lead to a different set of risks to society—such as, losses of crop production, higher prices for food, possible starvation in developing countries unable to afford higher food costs, etc. Alternative processes that lead to lower quality and reduced effectiveness in the resulting pesticides, also relate to the overall benefits of the pesticide under consideration. Consideration of the various nonprocess alternatives are discussed briefly in Chapter 6 when ways to quantify the benefits and costs from different production processes are described. Alternative Production Methods for Carbamate Pesticides The carbamate pesticides in production in Institute in 2008 were all N-­monomethyl carbamates, with carbaryl, aldicarb, and thiodicarb the primary pesticides produced onsite. The chemical reactions used to produce these pesti- cides are summarized in Figure 5.10. There are two reaction types available for the final step in synthesizing carbamate pesticides: additions to MIC and replace- ments in carbamates and carbonates (second and third equations of 5.10). The different pesticides are characterized by differences in the R group and physical formulations, but the underlying synthetic chemistry is similar. Specific applica- tions of the carbamate synthesis equations are shown in Figure 5.11. An early CH3NCO HOR CH3NHCO2R CH3NHCOX CH3NHCO2R HOR HX CH3NH2 OC(OR)2 CH3NHCO2R HOR addition replacement replacement + + + + + FIGURE 5.10  Possible methods for synthesis of N-monomethyl carbamate pesticides. These equations represent the generic forms of the possible synthetic pathways discussed later in this chapter.

The Use and Storage of Methyl Isocyanate (MIC) at Bayer CropScience Copyright National Academy of Sciences. All rights reserved. 92 USE AND STORAGE OF METHYL ISOCYANATE (MIC) AT BAYER CROPSCIENCE FIGURE 5.11  Synthesis routes for the production of carbaryl (without and with MIC) and aldicarb (with MIC). (A) A synthetic route for production of carbaryl without the use of MIC; (B) A synthetic route for production of carbaryl using MIC; and (C) A synthetic route for the production of aldicarb using MIC. non-MIC process for carbaryl is shown in the first equation. The MIC-based syn- theses of carbaryl and aldicarb are shown in the second and third equations. The most recent processes used by Bayer, DuPont, and Enichem to produce carbamate pesticides (described earlier) all use MIC. Carbaryl The first carbamate pesticide in production at the Institute plant was ­carbaryl. This broad-spectrum pesticide has relatively moderate toxicity to mammals, and it is commonly found in both agricultural and residential uses. It has a dem- onstrated toxicity for aquatic life (EPA, 2004), and environmental release is a concern for users of carbaryl. See Tables 5.1 and 5.2. Carbaryl was originally produced with a non-MIC-based chloroformate pro- cess (see Figure 5.11) using intermediates produced elsewhere, and this process was used for many years (1961-1977). In this reaction, 1-naphthol is reacted with phosgene to create a chloroformate. Reaction of the chloroformate with methylamine results in the formation of carbaryl. In 1978, the production process for carbaryl was changed to use MIC. See Figure 5.12 for a flow diagram of this process. The reasons given for the change were that the chloroformate process was highly corrosive, had lower yield, and generated considerable waste products. One internal report stated that with the change in process, the yield of carbaryl went from 86 percent to 92 percent with respect to 1-naphthol with a purity of 99 percent (Peck, 1978). Production of carbaryl then became the largest volume consumer of MIC at the Institute plant. At one point, because of high demand for the product, 40 million pounds of MIC was produced annually. In 2008, the

The Use and Storage of Methyl Isocyanate (MIC) at Bayer CropScience Copyright National Academy of Sciences. All rights reserved. MIC AND PESTICIDE PRODUCTION AT THE INSTITUTE PLANT 93 TABLE 5.1  Acute Toxicity Categories for Carbaryl Guideline No. Study MRID No. Results Toxicity Categorya 81-1 Acute oral—rat (99% a.i.) 00148500 LD50 for males = 302.6 mg/k; for females = 311.5 mg/kg; combined = 307.0 mg/kg II 81-2 Acute dermal—rabbit (99% a.i.) 00148501 LD50 > 2000 mg/kg III 81-3 Acute inhalation—rat (99% a.i.) 00148502 LC50 > 3.4 mg/L IV 81-4 Primary eye irritation—rabbit (99% a.i.) 00148503 Not a primary eye irritant IV 81-5 Primary skin irritation—rabbit (99% a.i.) 00148504 Not a primary skin irritant IV 81-6 Dermal sensitization—guinea pig (99% a.i.) 00148505 Negative NA

aI, highly toxic, severely irritating; II, moderately toxic, moderately irritating; III, slightly toxic, slightly irritating; IV, practically non-toxic, not an irritant. SOURCE: EPA (2004). process used a continuous fixed bed reactor run for 12 days followed by shutdown for 3 days to dissolve the accumulation of solids from the reactor (Martin, 2011). Aldicarb The Institute plant began producing aldicarb in 1976 (equation 5.11). Bayer personnel stated that of all the carbamates being produced at Institute, aldicarb was most clearly dependent on the use of the highly purified MIC generated from the existing Institute process. The primary uses of this pesticide are in early applications in commercial agriculture to control nematodes and sucking insects (U.S. EPA, 2010). In contrast to carbaryl, aldicarb and its metabolites are highly toxic through oral, dermal, and inhalational routes of exposure. Aldicarb is also toxic to fish and aquatic invertebrates. To render it safe to use, the aldicarb was processed into granules that reduced generation of dust and facilitated handling of the material, which in turn reduced exposure to the users. The MIC-based aldicarb production process used a batch reactor, with an extended cook-out period that generated a complete reaction (see Figure 5.13). This material was then shipped to Woodbine, Georgia for binding onto particles of gypsum. This method necessitated a very clean coating of the pesticide being deposited on the particles of gypsum in the final formulation. Any impurities in the MIC could lead to imperfections in the coating, resulting in serious problems with clumping of the final product in the applicators. Such impurities could also

The Use and Storage of Methyl Isocyanate (MIC) at Bayer CropScience Copyright National Academy of Sciences. All rights reserved. 94 USE AND STORAGE OF METHYL ISOCYANATE (MIC) AT BAYER CROPSCIENCE TABLE 5.2  Typical Human Hazard and Precautionary Statements Toxicity Category Systemic effects (oral, dermal, inhalation toxicity) Irritation effects (skin and eye) Sensitizera I Fatal (poisonous) if swallowed [inhaled or absorbed through skin]. Do not breathe vapor [dust or spray mist]. Do not get in eyes, on skin, or on clothing. [Front panel first-aid statement required.] Corrosive, causes eye and skin damage [or skin irritation]. Do not get in eyes on skin, or on clothing. Wear goggles or face shield and rubber gloves when handling. Harmful or fatal if swallowed. [Front panel first- aid statement required.] If product is a sensitizer: Prolonged or frequently repeated skin contact may cause allergic reactions in some individuals. II May be fatal if swallowed, [inhaled or absorbed through the skin]. Do not breathe vapors [dust or spray mist]. Do not get in eyes, on skin, or on clothing. [Appropriate first-aid statement required.] Causes eye [and skin] irritation. Do not get in eyes, on skin, or on clothing. Harmful if swallowed. [Appropriate first-aid statement required.] III Harmful if swallowed [inhaled or absorbed through the skin]. Avoid breathing vapors [dust or spray mist]. Avoid contact with skin [eyes or clothing]. [Appropriate first-aid statement required.] Avoid contact with skin, eyes, or clothing. IV No precautionary statements required No precautionary statements required.

aThere are no categories of sensitization. SOURCE: 40 CFR § 156.62. lead to greater formation of dust with correspondingly higher health risks. These issues were identified as a serious problem with most alternative sources of MIC, which tended to produce MIC of lower purity, which would in turn affect produc- tion of aldicarb. Figure 5.13 shows a simple process flow diagram for production of aldicarb. Other Carbamates Other carbamate pesticides (utilizing MIC) were also in production at Institute in 2008, but were not analyzed by the Committee for reasons described below. These pesticides include thiodicarb (Larvin), carbosulfan (Marshal), methomyl, which used a continuous plug flow reactor; and carbofuran (Furadan), which used a solventless process. The carbofuran unit was owned by FMC and operated by Bayer. When the Committee’s investigation began, Bayer had already decided to shut down production of methomyl and carbofuran after the 2008 accident. Pro-

The Use and Storage of Methyl Isocyanate (MIC) at Bayer CropScience Copyright National Academy of Sciences. All rights reserved. MIC AND PESTICIDE PRODUCTION AT THE INSTITUTE PLANT 95 FIGURE 5.12 Basic process flow diagram for production of carbaryl. SOURCE: Martin (2011). FIGURE 5.13 Basic process flow diagram for production of aldicarb. SOURCE: Martin (2011).

The Use and Storage of Methyl Isocyanate (MIC) at Bayer CropScience Copyright National Academy of Sciences. All rights reserved. 96 USE AND STORAGE OF METHYL ISOCYANATE (MIC) AT BAYER CROPSCIENCE duction of carbosulfan and thiodicarb continue using methomyl and carbofuran from an external source. The decision to close down those lines was apparently related to their location: those operations were in another part of the plant, requir- ing a separate MIC storage tank and a long pipe to transfer the MIC to that area. Of the carbamate pesticides being produced at Institute in 2008, only ­carbaryl had been produced by a non-MIC process. At the time the present study was initiated, it appeared that a modified MIC process for the synthesis of carbaryl would be restarted at the Institute plant. In that case, a complete and critical review of the literature, patents, and worldwide practice for MIC-based and non-MIC-based N-monomethyl carbamate pesticide syntheses could have been appropriate, although such a review would have required considerable time and resources. Given the decision by Bayer to discontinue production of both MIC and N-monomethyl carbamate pesticides at the Institute plant, such a detailed review became unnecessary. ALTERNATIVE ARRANGEMENTS OF PROCESSES A key concern with the overall design of the production processes at the Institute plant was the need for storage of considerable amounts of MIC. This arose because of the characteristics of the production processes for MIC and the four carbamate pesticides. To account for the agricultural calendar, the production of MIC was ideally run on a continuous basis through most of the year, with only limited shutdowns (except for one long shutdown in July and August). The dif- ferent carbamate processes had different schedules. The aldicarb and ­carbofuran processes ran all year long, whereas the carbaryl, oxamyl, and ­methamyl processes only required MIC during 4-5 months of the year. In addition, the Institute aldicarb and oxamyl processes ran in batch mode, and the carbaryl process was shut down for a few days every two weeks to dissolve solids from the reactor. Between the seasonal fluctuations and the short-run fluctuations in the carbamate processes, there was considerable variation in the need for MIC over time. The operators at the Institute plant had developed some degree of flexibility in the production rate for the MIC process, roughly a 3:1 (high:low) ratio, but they still relied upon a maximum MIC inventory level of 200,000 pounds to coordinate the MIC and carbamate production over time (Martin, 2011). At various times the owners of the Institute site considered ways to reduce the amount of MIC being stored onsite. Reductions in MIC storage could offset impacts on the risk of the overall process. Smaller inventories of MIC would reduce the magnitude of damages from a potential accidental release of MIC from storage. However, holding smaller inventories would increase the number of times the MIC and carbamate processes had to be started or stopped, due to halting MIC production when the storage capacity was reached and stopping the carbamate process when the MIC in storage was used up. This could increase the overall risk of the process, because startup and shutdown periods have the

The Use and Storage of Methyl Isocyanate (MIC) at Bayer CropScience Copyright National Academy of Sciences. All rights reserved. MIC AND PESTICIDE PRODUCTION AT THE INSTITUTE PLANT 97 greatest potential for accidents (the 2008 methomyl accident happened during process startup) (CSB, 2011). There were substantial reductions in the maximal MIC storage amounts at the Institute plant, from 1 million pounds at its peak to about 200,000 pounds more recently, as the scale of overall MIC production fell from over 40 million pounds annually in the late 1970s to around 10 million pounds by 2008 (Smythe, 2011). From 1989 to 1991 Rhône-Poulenc conducted an evaluation of alterna- tive approaches to MIC production, including having separate MIC generators attached to each carbamate production line in order to reduce the need for MIC storage. This approach could have reduced the potential damage in the case of an accident because the amount of MIC being stored on each line would be smaller, but there would have been four times as many places for an accident to occur. In the end, the complications associated with having four separate MIC produc- tion units was considered to outweigh the benefits of reduced MIC storage, and the production process was not changed. In 1993, Rhône-Poulenc’s Institute Modification Project allowed the MIC production unit to operate at reduced rates, permitting a better match between MIC and carbamate production rates without increasing MIC storage. Most recently, in August 2009, Bayer announced plans to reduce the amount of MIC storage from 200,000 pounds to 40,000 pounds, as part of a $25 million investment project that also strengthened the layers of pro- tection around the MIC production and storage units, and eliminated aboveground storage of MIC (Bayer CropScience, 2009). Another important issue relates to the physical layout of the production process. In the case of the Institute plant, in 2008, the production of carbamate pesticides occurred in two separate areas of the plant, with the aldicarb and carbaryl processes located relatively close to the MIC production area, whereas the carbofuran and methomyl processes were located some distance away, in the West Carbamoylation Complex (WCC). Each night the MIC needed for the next day’s carbofuran and methomyl production was transferred to an aboveground holding tank. The proximity of that MIC tank to the explosion in the methomyl production unit in 2008 was a key concern in the investigation of the accident. Bayer’s 2009 decision to shut down the WCC helped reduce the risks associated with storing MIC in an aboveground tank and the overnight pumping of MIC to that tank (Bayer CropScience, 2009; Smythe, 2011). Technical Considerations A comparison of different production processes begins with consideration of the underlying chemical reaction. This determines the per-unit variable cost of production, along with energy and capital costs. There may be some uncertainty, especially on the capital costs, as well as a learning curve associ- ated with operating a new production process. These uncertainties provide a substantial advantage for an incumbent production process, along with the cost

The Use and Storage of Methyl Isocyanate (MIC) at Bayer CropScience Copyright National Academy of Sciences. All rights reserved. 98 USE AND STORAGE OF METHYL ISOCYANATE (MIC) AT BAYER CROPSCIENCE advantage that no additional capital costs are required to continue using the existing equipment. Balanced against the costs of production is the revenue to be gained, which is likely to be influenced by the quality of the product. For the four alternative MIC production methods described above (DuPont, cyanate, ­diphenylcarbonate, and Enichem), purity of the MIC produced was an issue. According to the anal- ysis provided by Bayer, the DuPont process generated considerable impurities at startup, which would have been unacceptable for the high-purity production requirements for the manufacture of aldicarb. Collection and purification of the gaseous MIC prior to use in the synthesis would require storage of a quantity of MIC on site and would, to some degree, reduce the benefit of just-in-time production of the chemical. Adoption of this process at the Institute site also presents additional technical challenges, since it would have required adapting the Institute aldicarb and carbaryl processes to work with gaseous MIC rather than liquid MIC. In addition, as production of aldicarb oxime ran as a batch process, onsite storage of MIC would still be required for at least short periods of time. The cyanate method could match MIC production more closely to the batch versions of carbamate production. However, in order to accommodate the con- tinuous production units of carbaryl and methomyl, onsite storage would again be required. In addition, the cyanate process is generally run on a much smaller scale than the UCC process; and adapting it to the Institute scale of production would require a very large number of reactors being built on site, which have an increased risk of leaks and equipment failures. Finally, as mentioned previously, the cyanate process generates significant quantities of hazardous waste that would need to be controlled and disposed of appropriately. The diphenylcarbonate process for MIC production was used by Bayer in Germany until 2002. When that process was phased out, the company lost its in-house expertise. More importantly, however, this process depends on a supply of dimethylurea, which had been purchased from BASF in Germany but was not readily available in the United States. It is unclear whether onsite production of DMU was considered. There were also concerns about the quality of the MIC produced by the process, which could affect the final production of aldicarb. As with the DuPont process, an additional purification step might have resolved this issue, thought this would also have introduced a requirement for some onsite stor- age capacity. This process also requires the generation of phenol, which is also a hazardous material that must be managed, either by recycling of the material in the process or through treatment and disposal. The Enichem process, although listed as potentially promising in the late 1980s, also presented some concerns. For example, the process had only been run on a very small scale (less than 5 percent of the level of production at Insti- tute), and there were also concerns about the quality of the MIC that would be produced. The different MIC processes vary considerably in the purity of the

The Use and Storage of Methyl Isocyanate (MIC) at Bayer CropScience Copyright National Academy of Sciences. All rights reserved. MIC AND PESTICIDE PRODUCTION AT THE INSTITUTE PLANT 99 product MIC, with the Institute UCC process providing the highest MIC purity, which affects the quality of the resulting carbamate pesticides. INFORMATION REQUIRED FOR SCREENING ALTERNATIVES Performing a comprehensive inherently safer processes (ISP) analysis requires considerable information (see Chapter 4). There are multiple dimen- sions along which the processes can be compared, and many characteristics of each process need to be taken into account. These comparisons can then be incorporated into the process safety management (PSM) evaluations and, in turn, can affect business decisions. Indirectly, incorporating or developing systems that are “inherently safer” may reduce overall lifetime costs to a company by reduc- ing the possibility of accidental release of hazardous materials from the process, with potential damages to personnel, the production facility, and the surrounding community. When a company faces a decision about whether or how to change a process, more than the safety elements are considered, although safety could be a deciding factor in whether to move ahead. Some process characteristics are obviously part of any business decision, including the costs of the chemicals, labor and energy requirements, and new capital expenditures, as well as the quality of the product and revenues expected from its production. There can also be environmental impacts anticipated from the process, depending on the nature of the inputs being used and any by-products being generated. Many of these characteristics involve a substantial degree of uncertainty. The underlying chemical reaction may support relatively straightforward calculations of the amounts of different chemical and energy inputs needed for the process, and hence the expected per-unit production costs. The costs of developing and installing new capital equipment for the pro- cess will be less certain, as will the steepness of the learning curve when starting a new process. On the other hand, the probability and consequences of a major accident are much less certain, making it difficult to quantify those risks and consider them along with the other characteristics in the final decision-making process. Any firm approaching a redesign must consider the position of the product in the market and its expected life-cycle. At this point, carbamate pesticides are relatively mature products, with a limited remaining market life, and hence a less desirable focus for new investment. Of the pesticides made at Institute, aldicarb seemed to have fewer competing products, which may help explain why Bayer was initially willing to spend $25 million in 2010 to extend aldicarb production for a limited number of additional years (Bayer CropScience, 2009). In addition to production costs, the reaction identifies the particular chemi- cals involved in the process, as either inputs or by-products, and hence the hazards associated with the process. In addition to MIC itself, phosgene and chlorine are commonly used as reactants in carbamate production, and generation

The Use and Storage of Methyl Isocyanate (MIC) at Bayer CropScience Copyright National Academy of Sciences. All rights reserved. 100 USE AND STORAGE OF METHYL ISOCYANATE (MIC) AT BAYER CROPSCIENCE of unwanted by-products such as phenol also increases risks. Balanced against the hazards from the chemicals are the safety measures being employed in the process. These add to the costs of running the process, but reduce the risk of accidental exposures, both within the facility and in the surrounding community. Regulatory Considerations A company’s decisions about production processes are also strongly influ- enced by constraints imposed by other entities. For example, manufacturing carbamate pesticides for sale in the United States requires that the pesticide be approved by EPA. The pesticide approval process can take multiple years, and approval is needed when there is a substantial change in the production pro- cess for the pesticide. This gives a considerable advantage to an incumbent process that has already been approved by EPA. When Bayer evaluated several alternative methods for producing MIC in 2010, a major drawback of all the alter- natives, as identified by the company, was that changing the MIC process would require an EPA review and reapproval of the “new” pesticide, because the purity of the MIC could change. The reregistration process can be lengthy, could result in significant periods of lost production. . . such a gap in production could risk permanent loss of customers (farmers), who would have to switch to alternative pest control measures for at least one growing season. Government regulation of workplace and environmental hazards can also influence company decisions, given the hazardous nature of the chemicals involved. For example, the creation of EPA and the federal Clean Air Act and Clean Water Act legislation increased pressure to reduce air and water pollution in the 1970s. This pressure to limit pollution helped drive the decision by Carbide to switch away from a highly-polluting (non-MIC) process for carbaryl production to a MIC-based process that generated less pollution. This example highlights the complexities of regulating production processes—efforts to reduce exposures to one set of hazardous chemicals may lead to changes that increase the risks of exposure to other chemicals. For more information about policy initiatives relat- ing to ISP, see Appendix D. Company-Community Relationships Government regulators are not the only source of external pressures on the company’s decisions. The local community can also influence the decisions, and the relationship between the company and the surrounding community can be very important in this process. The relationship between a chemical company and the community that sur- rounds it is a complex one. Chemical companies manufacture useful products and provide employment for the local communities, but to create these prod- ucts, most chemical manufacturing processes require use of hazardous materials

The Use and Storage of Methyl Isocyanate (MIC) at Bayer CropScience Copyright National Academy of Sciences. All rights reserved. MIC AND PESTICIDE PRODUCTION AT THE INSTITUTE PLANT 101 and/or processes of some form. These hazards are managed through, among other things, process controls, training and education, and management systems. Regulatory structures, professional standards, and other forms of required and voluntary guidance reinforce and encourage safe practices. In case of accidents or leaks, emergency response systems are in place to help minimize the adverse consequences and control the event. Ideally, these protective systems overlap and integrate in such a way that the risks posed by the chemical and physical hazards onsite are as low as possible. Community perception and understanding of risk and safety are important. For example, when considering responses to accidents or leaks, if an incident large enough to require local emergency response services to respond is a pos- sibility, then a thorough understanding of the potential risks posed is required for development of an appropriate response and training of emergency personnel and community members. At a basic level, a neutral or positive relationship between a facility and its community allows for open discussion about risks and responses. It allows for a sense of trust that the experts onsite are operating with care and consideration. A negative relationship can influence the community perception of risk, lead to distrust, and create an environment of defensiveness and lack of engagement on important issues relevant to everyone involved. This issue has been examined in the literature with respect to community risk perception of nuclear and chemical facilities among other hazards (Starr, 1969, 1981, 1985). Community perception is built on so-called risk perception “frames,” which are closely linked with individual views about how societal decisions should be made (social control frames) and the way they think about a given problem (cog- nitive frames) (Wildavsky and Dake, 1990; Dake, 1991; Elliott and Hanke, 2003; Gray, 2003; Lewicki et al., 2003). In short, people use different frames, based on background, education, social norms, and the like, to define whether a problem exists and if so, what the problem is. People with different frames may disagree about the problem, its size and scope, and how to address it. Relevant to chemical manufacturing, one area in which differences in fram- ing exist is in how people view environmental hazards and whether they pose health risks for the community. Researchers working in the field of risk percep- tion have shown that parties confronting environmental hazards develop consider- ably different frames about the characteristics and intensity of the hazard (Elliott, 1984). Conflicting differences in how technical and lay populations frame risks occur frequently: the former stress prediction and prevention of risks whereas the latter are concerned about risk detection and repairing damage from risks that have occurred. Community perceptions of risk stem from a diverse set of factors ranging from the psychological to social processes of framing, to cultural expectations, and these factors play themselves out within a context of a particu- lar facility and the risks associated with that facility, the relationship between the facility and the surrounding community, and corresponding processes of com- munication, control, and conflict or collaboration.

The Use and Storage of Methyl Isocyanate (MIC) at Bayer CropScience Copyright National Academy of Sciences. All rights reserved. 102 USE AND STORAGE OF METHYL ISOCYANATE (MIC) AT BAYER CROPSCIENCE With regards to consideration of ISP, discussions between a facility and the community regarding trade-offs between possible alternative manufacturing methods could help the two sides understand their respective risk perceptions and tolerances. These shared understandings could then be used to help develop reporting and emergency response systems, outreach and communication strate- gies, and other activities in support of maintaining a safe environment and posi- tive relationship. Analysis and discussion of trade-offs is likely to be complex, and decision-aid methods, such as the example described in Chapter 6, could be useful for framing such a discussion by identifying points of disagreement and concurrence among stakeholder groups. The findings from these analyses can be used by companies to aid in decision making by helping to clarify the issues of concern to the members of the community. A good example of the role communities can play in facility decision-making processes can be seen in a comparison of the community relations at the Institute plant with those at a DuPont plant in La Porte, Texas. DuPont had been producing their methomyl insecticide, Lannate, using MIC shipped from the Institute plant. In 1985, restrictions on transportation of MIC following the Bhopal accident led DuPont to modify their Lannate production process to generate its own MIC. DuPont’s good relationship with the surrounding community permitted an open exchange of information about the new process, so that the community was willing to allow DuPont to start producing MIC in the facility, albeit with a process that involved no storage of MIC and only a few pounds of MIC in the process at any one time (Carberry, 2011). In contrast, the poor relationship between Bayer and its surrounding community resulted in a court injunction filed by community mem- bers to stop Bayer from resuming MIC production at Institute. This contributed to a complete shutdown of MIC production, even though Bayer had been producing MIC there for many years, had recently spent $25 million installing additional safety features, had reduced MIC storage levels by 80 percent, and was planning to phase out MIC production altogether within a few years. Thus, good commu- nity relations are crucial to a facility’s gaining local acceptance of their decisions. Today, decision making for the production, storage, and use of MIC and other hazardous chemicals is predominantly made by facility operators within the context of national, state, and local regulations and requirements. At the same time, the chemical industry has increasingly realized the importance of effective working relations with the communities in which plants are located. One example of this is the Responsible Care program described briefly in Chapter 2. This vol- untary program seeks to improve health, safety, and environmental performance in the chemical industry. At the heart of the International Council of Chemical Associations program is an effort for “companies to be open and transparent with their stakeholders—from local communities to environmental lobby groups, from local authorities and government to the media, and of course the general public.” Community advisory panels, as well as a wide range of other outreach efforts, have followed.

The Use and Storage of Methyl Isocyanate (MIC) at Bayer CropScience Copyright National Academy of Sciences. All rights reserved. MIC AND PESTICIDE PRODUCTION AT THE INSTITUTE PLANT 103 These efforts by the chemical industry have increased transparency, outreach, and dialogue with stakeholders external to facilities. However, as is seen in the dynamics surrounding questions of safety associated with MIC production and use at Bayer in Institute, West Virginia, these efforts have sometimes failed to produce a convergence of perspectives as to what poses significant risks to the community or how best to manage those risks. Divergent perceptions of risk, a problem common to many facilities that pose some level of risk to the sur- rounding community, are particularly important when the risks are potentially as substantial as those for chemicals such as MIC or phosgene. In Institute, there are obviously divergent perceptions of the risk posed by large-scale manufacture and storage of MIC at the Bayer facility between individuals working at the facility and at least one subset of the community. The most prominent group advocating for the removal of MIC from the facility is People Concerned about MIC (PCMIC), a group formed after the Bhopal disaster and which has worked toward that goal since that time. QUANTIFYING COSTS AND BENEFITS OF ALTERNATIVES Corporate decision making, at least as modeled by economists, is funda- mentally driven by the goal of profit maximization. Nicholson (2005) provides a standard textbook discussion of various terms used in this section, including profit-maximization, capital costs, expected value, and externalities. In terms of the technical considerations mentioned earlier, decision making involves a com- parison of the revenues generated by a production process with the costs of that production. At its simplest level, per-unit revenues from the sale of a pesticide could be compared to the per-unit costs of the chemicals and energy needed to produce the pesticide, and so a firm choosing among alternative processes that produced exactly the same product should choose the lowest-cost alternative. This calculation could be complicated by consideration of the capital expenditures associated with the processes, which enter the calculations as a one-time cost rather than a per-unit cost. However, suitable tools are available to deal with that, such as the present discounted value of future costs and revenues, or the annual cost of renting the capital each year. A profit-maximizing firm should also consider any risks involved in the production process. An accident causing a temporary shutdown in production and extensive repairs will represent a cost to the firm, but a cost with consider- able uncertainty attached to it, both in terms of magnitude and probability. One approach would be to assign the “expected value” of the accident (accident cost*probability), and so an accident with $50 million of damages and a three percent chance of happening each year would be assigned an expected annual cost of $1.5 million. It would then be profitable for the firm to implement safety mea- sures that could cut the damages (or the accident probability) in half, as long as those safety measures cost less than $750,000 per year. Firms are often assumed

The Use and Storage of Methyl Isocyanate (MIC) at Bayer CropScience Copyright National Academy of Sciences. All rights reserved. 104 USE AND STORAGE OF METHYL ISOCYANATE (MIC) AT BAYER CROPSCIENCE to use expected values to make these calculations, although if the potential risks are extremely large (e.g., complete shutdown of the facility or bankruptcy of the firm), the firm might be “risk averse,” equivalent to being willing to pay more than the expected value of the risk for some sort of insurance policy to avoid the risk. In the case of production risk using ISP to avoid the risk entirely would be one way of “buying insurance” against an accident. From the point of view of the broader society, a key problem with the profit- maximizing decision described above is that the firm would not include in its calculations all the costs borne by people who might be exposed as a result of an accident at the facility. This discrepancy between “private” and “social” costs has been a central topic in Benefit-Cost Analysis (BCA) for many years (see Pigou, 1952 for an early example and Boardman et al., 2010) for a modern textbook approach). BCA is commonly applied to government (and private) decisions to see whether they are in society’s best interest (benefits>costs), and is required for major federal regulations (e.g., under Executive Order 13563, January 18, 2011, regulations “must take into account benefits and costs, both quantitative and qualitative”). A firm’s decisions about risks, even those involving risks to others, can sometimes coincide with the socially optimal decision. Risks to the facility’s workers could, at least in principle, be reflected in compensating differentials— higher wages needed to attract workers to those risky jobs (assuming they know about the risk)—and would be included as a cost in the firm’s profit calculations. However, risks affecting people outside the facility would not generally be con- nected to the firm’s costs. Ignoring these external costs, called externalities, can lead a profit-maximizing firm to choose a riskier production process than would be optimal for society as a whole (Nicholson, 2005). One way of forcing firms to “internalize” these external costs (recognize the costs in their decision making) is through legal liability—if those damaged by an accident can sue the firm and collect full compensation for their damages, it provides an incentive for firms to reduce risks. The existence of externalities provides an economic justification for the activities of regulatory agencies (such as EPA or OSHA) that constrain firms’ decisions about utilizing hazardous production processes with high levels of external risks. The presence of regulators imposing penalties for violations of safety regulations can provide an incentive to firms to reduce the risks associ- ated with their production processes. Community groups picketing the facility or organizing boycotts of the firm’s products can also impose direct costs on firms using risky production processes. Both types of external pressures, regulatory and community-based, can lead firms to reduce risks, in order to reduce their likeli- hood of being penalized for those risks. Corporate Social Responsibility (CSR), whose history is discussed in ­Carroll (1999) and elsewhere, is another approach to firms’ decision making that empha- sizes society’s role in permitting the firm to operate. CSR sees the firm as having

The Use and Storage of Methyl Isocyanate (MIC) at Bayer CropScience Copyright National Academy of Sciences. All rights reserved. MIC AND PESTICIDE PRODUCTION AT THE INSTITUTE PLANT 105 a responsibility to take into account the external effects of its decisions. From this perspective, firms should consider how their decisions could achieve socially- preferred outcomes, considering external costs and benefits even when there are no regulatory or community pressures to do so. Many discussions of CSR describe firms as accepting lower profits in return for social acceptance, but Porter and Kramer (2006) argue that socially responsible decisions can also benefit the firm’s long-run profitability, especially if the firm focuses on providing benefits to society using its areas of expertise. Whatever decision-making process is being followed, one key element in the calculation of the optimal decision is the risk of an accident. This can be complicated, especially when the risk of a substantial release affecting the area outside the facility involves the simultaneous failure of multiple layers of protec- tion. Calculations of such risks often assume that the probability of each layer’s failure is independent, so that three layers of protection, each with a 1-in-10,000 risk, would provide an overall risk of 1-in-a-trillion. One lesson from the Bhopal accident is that, at least in that institutional setting, failures to manage risk were correlated across the layers of protection, greatly increasing the risk of an acci- dent. Regulatory decisions under BCA can depend heavily on the calculations of the risk of low-probability events, such as the probability of a large accident at a chemical plant, or the probability of a given person dying of lung cancer after being exposed to air pollutants. A key difference between these two examples lies in the frequency of their observations. Millions of people are exposed to air pollution every year, and the (very small) fraction of individuals who die after the exposure can be calculated, which allows one to determine reasonably precise estimates of the risk’s probability. For large industrial accidents, which fortunately rarely occur, calculations of the probabilities involved depend on engineering models of the effectiveness of the different layers of protection. It is not that such calculations cannot be made—they are done regularly as part of both applications of BCA and profit maximizing decisions by firms—but as noted in Box 4.1, there are inherent uncertainties and biases involved. There is also the sensitive issue of assigning values to the illnesses or deaths of people that could result from a major accident. For profit-maximizing deci- sions by the firm, these values can be related back to the potential liability costs of an accident, as discussed earlier. For BCA applications, the most common tool is the “value of a statistical life” (VSL). Suppose that a typical worker requires $5,000 extra wages per year in order to accept a risky job that has a 1-in-1,000 chance of a fatal accident during the year. A group of 1,000 such workers would, on average, have suffered one extra death per year—and would have accepted a total of $5 million to bear the risk of that death—so the VSL would be $5 mil- lion. Considerable effort has been expended by both academics and regulatory agencies to refine their VSL estimates, as well as to consider whether and how VSL values might vary within the population (see Aldy and Viscusi, 2007 for a recent example). Despite the common use of VSL in these calculations, many

The Use and Storage of Methyl Isocyanate (MIC) at Bayer CropScience Copyright National Academy of Sciences. All rights reserved. 106 USE AND STORAGE OF METHYL ISOCYANATE (MIC) AT BAYER CROPSCIENCE are uncomfortable about “putting a dollar value on a life”, and regulators face considerable controversy when making adjustments to VSL (see Nelson, 2011 for a discussion of such controversies at EPA). IMPLEMENTING METRICS A fully quantitative inherently safer process (ISP) analysis that assigns val- ues to all the benefits and costs from alternative production processes, including risks of accidents and other uncertain outcomes, would require considerable resources and a level of detail about production costs and risks that were not made available for this study. The owners of the Institute plant have done some comparisons of alternative production processes, although these were not fully quantitative. The most recent example of this sort of analysis at Institute was an analysis of alternative methods of producing MIC, mentioned in above (Smythe, 2011). A summary of the results is shown in Table 5.3. The first thing to note is that the various dimensions in the analysis are described in qualitative terms (high, low, medium), which rules out any sort of fully quantitative analysis of trade-offs across dimensions. The underlying study did include dollar amounts for the per-unit cost of production (summarized here in low/high terms, to avoid revealing any confidential business information), but the other dimensions were qualitative. This sort of qualitative information could still be valuable in conducting an ISP analysis of the processes and could be used in support of or as a start- ing point to quantitative analyses. One value would come in identifying cases where option A is “dominated” by option B, that is B performs better on every dimension. This would be unusual, given multiple dimensions, but it helps to rule out clearly unsatisfactory options. A second value comes in helping focus the discussion of trade-offs. Also indicated in Table 5.3 that the Bayer process has low process complexity, low waste generation, and low internal recycle streams. All of these characteristics would tend to make it an “inherently safer” process, relative to the other four. However, the need for a supply of dimethylurea (DMU) was a major obstacle, because it was not available in the United States, made this option unfeasible at the Institute plant. It is unclear whether onsite production of DMU was considered as part of the analysis. When Bayer explained how this information was used in its decision mak- ing about the best MIC production process, major advantages were seen for the incumbent process. The “bottom line” yes/no questions— “adaptation of infra- structure,” “R&D required,” and “registration required” —played a crucial role in the decision. These all show “no” for the Institute process and “yes” for the four alternative processes. “Adaptation of infrastructure” refers to the potentially large capital costs that would be needed to install the equipment needed for a new process (while the equipment for the existing process is already in place). “R&D required” reflects the uncertainty and learning costs associated with beginning

The Use and Storage of Methyl Isocyanate (MIC) at Bayer CropScience Copyright National Academy of Sciences. All rights reserved.

perience Mature Mature Mature Mature One Unit? SOURCE: Adapted from Smythe, 2011. a: F – Very Flammable, F+ – Extremely Flammable, T – Toxic, T+ – Very Toxic, Xn – Harmful, C – Corrosive.

The Use and Storage of Methyl Isocyanate (MIC) at Bayer CropScience Copyright National Academy of Sciences. All rights reserved. 108 USE AND STORAGE OF METHYL ISOCYANATE (MIC) AT BAYER CROPSCIENCE any new production process. The final element, “registration required”, confers a unique advantage upon the incumbent process in the case of pesticide production. As noted earlier, the need for EPA to reapprove the “new” version of the pesticide (made using MIC generated by a new MIC production process with different impurities) would cause a delay of months to years (once the agricultural cycle is taken into account) in marketing the pesticide. Since carbamate pesticides are near the end of their marketing life anyway, such a delay could make the shift to a new process uneconomical. If it were possible to keep the old process operating during the EPA review of the new process, “registration required” might be less of an absolute barrier, but that was not the situation faced by Bayer in 2010, and few facilities would have the extra physical space needed to continue running the old process while constructing the new one. Bayer eventually decided to continue the existing MIC production process, but with an 80 percent reduction in the maximum MIC storage levels (from 200,000 pounds to 40,000 pounds), and other safety enhancements, including the elimination of aboveground MIC storage and the closure of the methomyl facility. The August 26, 2009 news release announcing this decision identified “the concerns of public officials and the site’s neighbors” as an important factor and promised to “continue its dialogue and close cooperation with the com- munity and govern­mental agencies involved” (Bayer CropScience, 2009). This highlights the importance of external pressures on the decision-making process. Bayer personnel indicated that the decision-making process was carried out at the corporate level, including the size of the reduction in MIC storage levels, and the facility’s involvement was limited to confirming that a reduction in MIC storage to 40,000 pounds was feasible. In particular, the size of the reduction in MIC storage did not seem to be based on a specific analysis of the potential trade-off between the risks of larger MIC storage capacity and the risks of more frequent startup/shutdown conditions (i.e., why was 40,000 pounds the optimal MIC stor- age capacity, rather than 30,000 or 60,000 pounds?). As noted earlier, this study focuses on alternative processes for producing carbamate pesticides at the Institute plant. In these calculations, the relative costs (both production costs and potential accident risks) associated with dif- ferent processes have been considered, but the decision whether to produce the pesticides at all, which would depend on the overall benefits and costs of pesticide production, was not. Expanding the analysis to include these decisions would require additional information, including the benefits of these particular pesticides to farmers, relative to using other pesticides or no pesticides at all. These benefits may be reflected (at least partially) in the price of the pesticide, and thus be included in the company’s decision. Many of the decisions by Bayer in recent years have been of this type: deciding first to shut down the methomyl and carbofuran production lines, then later to stop MIC production altogether, along with the production of additional carbamate pesticides. Looking again at the four MIC manufacturing processes in light of consider-

The Use and Storage of Methyl Isocyanate (MIC) at Bayer CropScience Copyright National Academy of Sciences. All rights reserved. MIC AND PESTICIDE PRODUCTION AT THE INSTITUTE PLANT 109 ations such as those discussed above, Bayer’s predecessors developed a table to help evaluate the trade-offs among the alternatives. Although this table provides a very useful starting point for a comparison of technologies, it excludes factors that may be important in the decision-making process, from the perspective of both the company and the community. For example, it does not include the vol- ume of onsite MIC storage required, the risk of an accidental release into the sur- rounding community (which is related to storage volumes), the purity of the resulting MIC, or the likelihood of facing a community lawsuit. The next chapter discusses one possible systematic framework for identifying the key attributes that must be included into this type of decision and for analyzing the trade-offs. CONCLUSIONS Several decisions regarding process safety were made over the years by the owners of the Institute, West Virginia plant. Most of these decisions involved add- ing safety protections to existing processes, rather than changes to the underlying process. Bayer and its predecessors evaluated trade-offs among the alterna- tives, but while analysis provides a very useful starting point for a comparison of technologies, it excludes factors that may be important in the decision, from the perspective of both the company and the community. The only major change in production process was in 1978 from chloroformate to isocyanate in the carbaryl production. For an ISP analysis that focused solely on MIC usage, this was going in the “wrong” direction, but increasing environmental concerns in the 1970s about the level of pollution by-products of the chloroformate process, relative to the isocyanate process, were the driving factor behind that decision. Depending on the extent of environmental damages caused by the pollution from the chloroformate process and the probability and magnitude of the damages from an accidental MIC release, the overall risks generated by carbaryl production at the Institute plant might well have been reduced by the change to using MIC. Decisions about the production processes at the Institute plant appear to have been driven by business conditions and external pressures, rather than resulting from an application of ISP analysis to the processes. A timeline of these decisions is provided in Appendix B. The earliest example in the data was the establishment of the Union Carbide Reactive Chemicals employee awareness training program and the Kanawha Valley Emergency Planning Committee, following explosions at the site in 1954 and 1955. The 1984 Bhopal accident led to expansion of the MIC destruction capacity and other safety enhancements. Restrictions on the shipment of MIC following Bhopal also led FMC to shift its production of carbofuran to the Institute plant. The 2008 methomyl accident and EPA regulatory decisions led Bayer to not restart the methomyl and carbofuran production lines, and the court injunction and other delays in restarting production eventually led Bayer to close down MIC production at Institute. The decisions at the Institute plant also demonstrate the importance of vari-

The Use and Storage of Methyl Isocyanate (MIC) at Bayer CropScience Copyright National Academy of Sciences. All rights reserved. 110 USE AND STORAGE OF METHYL ISOCYANATE (MIC) AT BAYER CROPSCIENCE ous barriers to change in existing production processes. On the cost side, there are investment costs for installing new production equipment and the uncertainty and learning costs associated with beginning a new process. In addition to these cost factors, a key factor in recent decisions at the Institute plant about their car- bamate pesticide production process was the requirement for EPA registration of pesticides. This gives a substantial advantage to incumbent production processes, since changing to a new production process for an existing product means a delay in production while the “new” version of the product is being approved by EPA—potentially losing customers as farmers switch to other products during one or more growing seasons. REFERENCES Aldy, J. E., and W. K. Viscusi. 2007. Age differences in the value of statistical life: Revealed prefer- ence evidence. Review of Environmental Economics and Policy. Vol. 1, Issue 2. Summer. Pp. 241-260. Bayer CropScience. 2009. Bayer Crop Science Announces Investment of $25 Million for Institute Site. Bayer News Release: August 26 [online]. Available: http://www.bayerus.com/News/News Detail.aspx?ID=586330BF-C83B-4EF3-93DBFF791373C7D7. Accessed: Feb 14, 2012. Boardman, A. E., D. H. Greenberg, A. R. Vining, and D. L. Weimer. 2010. Cost-Benefit Analysis: Concepts and Practice. 4th ed. Prentice-Hall. Carberry, J. 2011. Transition to Just-in-time Production of MIC. Presentation to the committee in Washington, DC. Carcia. P. F. et al. 1984. Catalytic Conversion of Formamides to Isocyanates. US Patent Number 4,469,640. Issued September 4. Carroll, A. B. 1999. Corporate social responsibility: Evolution of a definitional construct. Business and Society. Vol. 38. No. 3. September. Pp. 268-295. CSB (U.S. Chemical Safety and Hazard Investigation Board). 2011. Investigation Report: January 2011 Pesticide Chemical Runaway Reaction Pressure Vessel Explosion. Report No. 2008-08- I-WV [online]. Available: http://www.csb.gov/assets/document/Bayer_Report_Final.pdf. Ac- cessed: February 6, 2012. Dake, K. 1991. Orienting Dispositions in the Perception of Risk: An Analysis of Contemporary Worldviews and Cultural Biases. J. Cross-Cultural Psychol. 22:61-82. Elliott, M. 1984. Improving community acceptance of hazardous waste facilities through alternative systems for mitifating and managing risk. Hazardous Waste: A Journal for Technology, Health, Environmental and Policy Research 1(3):397-410. Elliott, M., and R. Hanke. 2003. Framing effect in toxic disputes: Cross-case analysis. Pp. 333-354 in Making Sense of Intractable Environmental Conflicts: Concepts and Cases, R. Lewicki, B. Gray, and M. Elliott, eds. Washington, DC: Island Press. EPA (U.S. Environmental Protection Agency). 2004. Carbaryl IRED Facts [online]. Available: http:// www.epa.gov/oppsrrd1/REDs/carbaryl_ired.pdf. Accessed: February 6, 2012. EPA. 2010. Agreement to Terminate All Uses of Aldicarb, October 2010 [online]. Available: http:// www.epa.gov/oppsrrd1/REDs/factsheets/aldicarb_fs.html. Accessed: Sept. 29, 2011. Giesselmann, G., K. Gunther, and W. aus der Funter. 1980. Process for the production of methyl isocyanate. U.S. Patent 4,206,136. Gray, B. 2003. Framing of environmental disputes. Pp. 11-34 in R. Lewicki, B. Gray, and M. Elliott (Eds.), Making Sense of Intractable Environmental Conflicts: Concepts and Cases. Washington, DC: Island Press.

The Use and Storage of Methyl Isocyanate (MIC) at Bayer CropScience Copyright National Academy of Sciences. All rights reserved. MIC AND PESTICIDE PRODUCTION AT THE INSTITUTE PLANT 111 International Council of Chemical Associations [online]. Available: http://www.icca-chem.org/en/ Home/Responsible-care/What-we-do/. Accessed: February 6, 2012. Kober, E., and T. Smith. 1968. Process for preparing isocyanates. United States Patent 3,366,662. Lewicki, R., B. Gray, and M. Elliott. 2003. Making Sense of Intractable Environmental Conflicts: Concepts and Cases. Washington, DC: Island Press. Martin, W. 2011. ECC Presentation to NAS. Presentation at the Second Meeting on Inherently Safer Chemical Processes. March 21-22, 2011. West Virginia State University. Peck, D. W. 1978. Technology Summary Report: Manufacture of Carbaryl. Memorandum. Nelson, G., “EPA Plans to Revisit a Touchy Topic—the Value of Saved Lives”. Greenwire.com. January 18, 2011. Nicholson, W. 2005. Microeconomic Theory: Basic Principles and Extensions. 9th Ed. South-Western. Pigou, A. C. 1948. The Economics of Welfare. 4th Ed. Macmillan and Co. Ltd. Porter, M. E., and M. R. Kramer. 2006. Strategy and society: The link between competitive advantage and corporate social responsibility. Harvard Business Review. December. Rao, V. N. M. et al., 1985. Multi-Stage Process with Adiabatic Reactors for the Preparation of Iso- cyanates. U.S. Patent Number 4,537,726. Issued: August 27, 1985. Rivetti, F., F. Mizia, G. Garone, and U. Romano. 1987. Process for the Production of N-Methylcar- bamates. U.S. Patent Number: 4,659,845. Issued: April 21, 1987. Romano, U., F. Rivetti, and G. Sasselli. 1984. Improved process for preparing alkyl isocyanates. European Patent Number: EP 0 125 726 A1. Issued: November 21, 1984. Smythe, S. 2011. An Evaluation of Alternate MIC Technologies. Presentation at the First Meeting on Inherently Safer Chemical Processes. February 9. Washington, DC. Starr, C. 1969. Social benefit versus technological risk. Science 165:1232. Starr, C. 1981. Risk criteria for nuclear power plants: A pragmatic proposal. Risk Anal. 1:113. Starr, C. 1985. Risk management assessment and acceptability. Risk Anal. 5:97. Wildavsky, A., and K. Dake. 1990. Theories of risk perception: Who fears what and why? Daedalus. 119:41-60.

The Use and Storage of Methyl Isocyanate (MIC) at Bayer CropScience Copyright National Academy of Sciences. All rights reserved.

The Use and Storage of Methyl Isocyanate (MIC) at Bayer CropScience Copyright National Academy of Sciences. All rights reserved. 6 A Framework for Decision Making INTRODUCTION Chapter 5 presented four alternatives available to Bayer: (1) continuing with the existing process, (2) adopting an alternative chemical process not involving MIC, (3) using an alternative process for MIC production that would consume MIC immediately and thus not require storage, and (4) reducing the volume of stored MIC and the risks of transporting MIC from one facility within the site to another by rearranging process equipment. Table 6.1 summarizes how these four alterna- tives compare along several key performance features, or “attributes”, some of which were captured in Table 5.3 and some of which are additional attributes that could have been considered an analysis of trade-offs. An “X” indicates that the given manufacturing approach is superior to the others along the given attribute. As is clear from this comparison, none of the alternatives is superior to all the ­others along every attribute. For example, the Institute process, while posing higher risks due to the volume of MIC stored, generates less wastewater than the original non- MIC process used to produce carbaryl, and also has many cost advantages Given that no alternative clearly dominates the others, the question arises as to what decision-making framework could be used to identify the “best” choice. Benefit-cost analysis (BCA), as described in Chapter 5, assigns dollar values to the different attributes, based on their expected values, adds together all the ben- efits and costs for each alternative, then chooses the one with the highest net ­benefits. While Chapter 5 illustrated that valuing uncertain attributes can be diffi- cult in many cases, BCA has been used extensively for many years by government agencies, and certain conventions have been adopted (such as using the value of a statistical life to evaluate fatality risks) to deal with some common attributes. 113

The Use and Storage of Methyl Isocyanate (MIC) at Bayer CropScience Copyright National Academy of Sciences. All rights reserved. 114 USE AND STORAGE OF METHYL ISOCYANATE (MIC) AT BAYER CROPSCIENCE TABLE 6.1  Multiple Attribute Analysis of Alternative Carbamate Pesticide Production Processes (1)—Existing Institute Process (2)—Non-MIC Processes (3)—Process Producing Gaseous MIC Consumed Immediately (4)—Alternative MIC-based Process Arrangements, Reducing Onsite Storage Potentially Important Attributes External/Regulatory Pressures Manufacturing Approach (1) (2) (3) (4) Liability for harm to surrounding communities X X Community acceptance X ? Liability for worker injury due to MIC exposure X ? Liability for worker injury due to dust exposure X Wastewater disposal requirements X X Length of time for regulatory approval X Internal/Cost Pressures Product purity X X Cost and availability of chemical feedstocks X X Capital costs X Equipment O&M costs X Costs of safety equipment ? ? ? ? Process corrosivity X X Process yield X Availability of in-house expertise X X Previous experience with large-scale production X NOTE: “X” indicates that the given pesticide manufacturing approach performs better than the others along the given attribute. “?” indicates that information available to the committee was insufficient to evaluate the approach along the given attribute. The complex, multi-attribute decision-making Bayer and the legacy owners faced when modifying the MIC and carbamate-pesticide production processes is a challenge that will be familiar to many in the chemical industry. Incorporating risk considerations into these analyses can be particularly challenging as the final decision may affect individuals and organizations beyond the company itself, e.g., reducing or increasing requirements for local emergency responders. In fact, several experts in chemical engineering have suggested that the lack of effective methods for analyzing such trade-offs is a major barrier to the widespread use of inherently safer processes (ISP; Khan and Amyotte, 2004). With this in mind, the committee chose to present one possible approach for analyzing these and other trade-offs, while recognizing other methods are also possible.

The Use and Storage of Methyl Isocyanate (MIC) at Bayer CropScience Copyright National Academy of Sciences. All rights reserved. A FRAMEWORK FOR DECISION MAKING 115 The alternative to BCA described in this chapter is multi-attribute utility theory (MAUT), one of a suite of methods—or decision aids—developed to assist with complex decision-making involving multiple stakeholders. MAU (described in more detail in the next section) keeps the attributes separate throughout the process and emphasizes the multi-dimensional nature of the decision process. The method recognizes explicitly that different people could assign different values to the different attributes—both in how strongly the person weights different attributes when making the final decision and possibly even in whether the attri- bute is considered to be positive or negative. By forcing the user to confront the multiple attributes and decide their relative importance, MAU may help clarify a difficult decision (or at least the difficult trade-offs involved). However, MAU is still a relatively unfamiliar process for most companies, which is a disadvantage when it comes to applying the method in real-world cases. MULTI-ATTRIBUTE UTILITY THEORY The need for trade-offs among conflicting objectives under uncertainty is pervasive in many decisions faced by businesses, government agencies, and other organizations. Decision scientists have conceived formal methods for balancing such trade-offs and have established mathematically that these methods yield the choice that maximizes the utility to the decision maker. Many approaches to multiple-criteria decision making are available from the fields of economics and decision analysis, including, for example, analytic hierarchy process (AHP) analysis and fuzzy set theory. Overviews of methods for multi-attribute or crite- ria decision analysis can be found in Belton and Stewart (2002), Figueira et al. (2005), and DeBrucker et al. (2012). There are strengths and weaknesses for each methodology, and these should be evaluated and understood by any user prior to application. MAU, one example of these analysis methods, assigns a numeric value (utility) representing a specific decision maker’s preferences to each of the (multi-attribute) outcomes of each choice under consideration. The discussion below illustrates how MAU could be employed in supporting decision making in the chemical manufacturing industry, while recognizing that the AHP, fuzzy set theory, and other decision-making frameworks also could be considered. MAU is not a new idea to the chemical community. In 1995, the Center for Chemical Process Safety (CCPS) published a book that suggested that MAU and other decision aids could be used to support process safety assessments (CCPS, 1995). However, these decision aids, although employed regularly in other busi- nesses, have yet to take hold in the chemical process industry. The CCPS’s obser- vation from its 1995 book remains true today: “Decision aids have been applied only to a very limited extent in risk decision problems in [the chemical process] industry.” The CCPS indicates key obstacles to adopting these tools include lack of familiarity with the tools among chemical process industry decision makers and fear that the methods are either too simple or too costly. Nonetheless, the

The Use and Storage of Methyl Isocyanate (MIC) at Bayer CropScience Copyright National Academy of Sciences. All rights reserved. 116 USE AND STORAGE OF METHYL ISOCYANATE (MIC) AT BAYER CROPSCIENCE committee believes that MAU and/or other techniques from decision analysis could prove highly valuable for strengthening the integration of safety concerns into decision making in the chemical process industry. Use of these techniques could benefit not only those at risk due to safety breaches but the industries themselves, as the techniques can lead to the identification of profitable safety solutions that otherwise may have been overlooked. These tools could also assist in strengthening the relationship between companies and communities by provid- ing a framework for requesting and receiving input from external stakeholders. Such input may help identify overlooked concerns or areas where additional com- munication and outreach could be beneficial for maintaining a safe environment and a positive relationship with the external stakeholders. This section first provides an overview of MAU theory and its use for analyz- ing trade-offs in complex decision problems under uncertainty. Then, it describes some limitations of the inherent safety indexes currently being used. Finally, it suggests an approach for employing MAU concepts in ISP assessments focused on improving the choice of chemical manufacturing process. However, as noted previously, MAU theory is not the sole method of approaching these difficult questions, although it is hoped that the discussion here will demonstrate the potential utility of these types of decision aids. Decision Sciences and MAU Models: Background The field of decision sciences emerged from the axioms of rational choice first posed by mathematician John von Neumann and economist Oskar ­Morgenstern in 1947. Von Neumann and Morgenstern proved that if an agent (decision maker) has preferences with four specific characteristics (completeness, transitivity, con- tinuity, and independence), then there must exist a mathematical equation known as a utility function such that the decision makers’ preferences can be captured by maximizing the equation’s expected value (von Neumann and ­Morgenstern, 1947; French, 1986). The utility function is usually designated as U(x), where x=(x1, . . ., xn) is a vector representing how well a particular decision option satisfies each of n attributes important to the decision maker. Because the utility function includes multiple attributes, it provides a framework to consider trade- offs among those attributes (for example, among cost, risk, and performance). Since von Neumann and Morgenstern published the axioms of rational util- ity, decision scientists have developed systematic methods for characterizing utility functions (see, e.g., Keeney and Raiffa, 1976; French, 1986; Raiffa et al., 2002). Many different mathematical forms for utility functions have been con- ceived. Each functional form makes certain assumptions about independence of and/or interactions among the conflicting objectives. For example, the simplest type of utility function is linear in all the attributes:

The Use and Storage of Methyl Isocyanate (MIC) at Bayer CropScience Copyright National Academy of Sciences. All rights reserved. A FRAMEWORK FOR DECISION MAKING 117

∑ ) ) ( (

…

= U x x kU x , , n i i i i n 1 1

(6.1) In this function, the Ui(xi) represents individual utility functions for each of the decision maker’s n objectives, and the ki represents weights assigned to the differ- ent objectives. These weights reflect the value to the decision maker of an option that offers the best possible outcome along objective i, while setting all other objectives at their worst possible values. For this type of utility function to accu- rately characterize preferences, certain strict independence conditions must hold (for details, see Clemen and Reilly, 2001, and other texts on decision theory). In essence, the decision makers’ preferences for one attribute cannot change as levels of some other attribute change, even if the outcomes along attributes are uncertain. Another type of utility function, requiring weaker independence condi- tions, is the multiplicative function, expressed as follows:

∏ ) ) ( ( +

…

+ kU x x kkU x 1 , , [ 1] n i i i 1

(6.2) Several textbooks explain in detail the methods for determining which func- tional form is appropriate for the decision situation at hand (e.g., Keeney and Raiffa, 1976; Bunn, 1984; Clemen and Reilly, 2001). Formal courses in decision analytic methods are offered in many business and engineering schools. In gen- eral, the methods involve the following steps: • Identifying the fundamental objectives of the decision makers and attri- butes that can be used to represent progress along each objective; • Eliciting individual utility functions for each attribute (the Ui(xi) in the above equations)—functions that may be linear, concave, or convex, depending on the decision makers’ risk tolerance; • Testing the attributes for independence to determine the appropriate func- tional form (e.g., linear, multiplicative, linear-multiplicative) for the MAU model; and • Eliciting the scaling constants (the k and ki in the above equations) for the multi-attribute function. The resulting MAU model will be specific to the decision makers upon whose values it is based, and as a practical matter, it may be difficult for the decision makers to identify their preferred attributes. Adding to the complexity, even if different interest groups can agree on the attributes that should be con- sidered in a decision, they may prefer different trade-offs among the attributes (e.g., willingness to trade cost savings for decreased health hazard) or have difficulty assigning values to the trade-offs, and they may exhibit different risk tolerances (willingness to gamble on outcomes with the potential for high payoff

The Use and Storage of Methyl Isocyanate (MIC) at Bayer CropScience Copyright National Academy of Sciences. All rights reserved. 118 USE AND STORAGE OF METHYL ISOCYANATE (MIC) AT BAYER CROPSCIENCE but also high risks of loss). As a result, different utility functions (with different single-attribute utility functions and scaling constants) are needed to reflect the preferences of groups with different values. It is worth noting that some efforts to develop indexes for ISP assessments assume that there is a single correct pro- cess design from an inherent safety perspective. However, groups with disparate values may have differing utility functions that may lead to differences in the preferred manufacturing process. Although multiple MAU models may be needed to reflect different groups’ values, these models can be extremely useful in guiding negotiations among groups in conflict (Raiffa et al., 2002). As Clemen and Reilly (2001) point out, “Understanding trade-offs can be crucial for making progress in negotiation set- tings.” By making values explicit, MAU models can reveal similarities and differ- ences in the value structures of groups. As an example, MAU models can be used to identify trade-offs between risk reductions and cost reductions. Keeney and McDaniels (1992) show that a MAU function developed to inform strategic deci- sions of the British Columbia Hydro and Power Authority (BC Hydro) implies that the company decision makers value a hectare of wilderness lost at $2,500 (see Box 6.1). That is, at least $2.5 million in economic benefits would be needed to justify a company choice that would damage a thousand hectares of wilderness. Disagreements on certain features of a decision do not always result in different preferred alternatives. That is, a MAU process may reveal that groups in conflict might make similar choices in spite of their different values. When groups do differ in their preferred alternatives, a MAU model can highlight the main features of the decision about which groups disagree, and this may facilitate compromise. Raiffa et al. (2002) provides detailed guidance on the use of MAU models in negotiations among parties in conflict. Decision analytic methods are now widely employed in business and other applications, from fire department operations planning to nuclear power facility siting (Keeney and Raiffa, 1976; von Winterfeldt and Edwards, 1986; Keefer et al., 2004). The Decision Analysis Society, a specialty group within INFORMS (Institute for Operations Research and the Management Sciences), organizes regular conferences to exchange both academic and practical information on decision analysis and publishes a journal, entitled Decision Analysis. Keeney and Raiffa (1976) and von Winterfeldt and Edwards (1986), along with more recent issues of Decision Analysis, provide many more practical examples of applica- tions of MAU theory to decision making. The example provided in Box 6.2 shows that firms can “discover” new information about their preferences by using MAU—in this case, an alternative that was preferred in four out of five attributes turned out not to be the optimal choice, because of the high value the firm placed on the fifth attribute. Note that MAU provides a framework for making rational decisions; it does not necessarily describe how people actually make decisions. In fact, substantial research has indicated that individuals often do not act in accordance with the

The Use and Storage of Methyl Isocyanate (MIC) at Bayer CropScience Copyright National Academy of Sciences. All rights reserved. A FRAMEWORK FOR DECISION MAKING 119 BOX 6.1 MAU Model Informs Strategic Decisions in the Hydropower Industry

The British Columbia Hydro and Power Authority (BC Hydro) has used MAU to inform strategic decisions since the late 1980s, when the company commissioned Ralph Keeney and Tim McDaniels to support a comprehensive reassessment of the company’s planning processes. Keeney and McDaniels constructed a MAU model that BC Hydro then used to support decisions related to capital equipment upgrades, supply planning, and other corporate strategic issues. Keeney and McDaniels (1992) and Clemen and Reilly (2001) summarize how the MAU model was developed and the values revealed by the model.

First, Keeney and McDaniels interviewed BC Hydro’s key decision makers to identify their objectives and sets of attributes for measuring progress toward those objectives. The result was the set of six funda­ mental objectives and 22 attributes for measuring performance shown in Table 6.2. Next, Keeney and McDaniels assessed a MAU function for combining all of these attributes into a summary measure of utility for the company. The result was a combination linear-multiplicative utility func­ tion (see Keeney and McDaniels, 1992). This function then was pro­ grammed into a spreadsheet to allow BC Hydro’s managers to assess the overall utility of various decision alternatives.

Keeney and McDaniels used the resulting MAU function to illustrate the dollar value, from the company’s perspective, of various attributes. For example, they showed that the value of a hectare of wilderness, from the company’s perspective, is equivalent to $2,500, so that any process change that would cause such a loss but produce less than $2,500 in expected gain would not be worthwhile. Similarly, they showed that two power outages per year of 2 hours duration each to 20,000 large (com­ mercial and industrial) customers was equivalent to $83 million. Keeney and McDaniels observed that “if BC Hydro had opportunities to reduce expected outages of that nature at a cost less than $83 million, those opportunities would be good investments from the utility’s perspective.”

After Keeney and McDaniels’ MAU decision support model was in place, BC Hydro’s Director of Strategic Planning commented, The structured set of objectives has influenced BC Hydro planning in many contexts. Two examples include our work to develop a decision framework for supply planning, and a case study of an investment to upgrade reliability. . . . Less obvious has been an evolution in how key senior planners view planning issues. The notion of a utility function over a range of objectives (rather than a single objective, like costs) is evident in many planning con­ texts. The specific trade-offs in the elicitation process are less important than the understanding that trade-offs are unavoidable in electricity utility decisions and that explicit, well-structured, informed trade-offs can be highly useful. (Keeney and McDaniels, 1992, p. 109, as quoted in Clemen and Reilly, 2001)

The Use and Storage of Methyl Isocyanate (MIC) at Bayer CropScience Copyright National Academy of Sciences. All rights reserved. 120 USE AND STORAGE OF METHYL ISOCYANATE (MIC) AT BAYER CROPSCIENCE TABLE 6.2  Fundamental Objectives and Attributes for Measuring Progress along Objectives Described in Hydropower Case Study in Box 6.1

  1. Maximize contribution to economic development

Minimize cost of electricity use (mills per kilowatt-hour in 1989 Canadian dollars)

Maximize funds transferred to government (annualized dividend payable)

Minimize economic implications of resource losses (cost of resource losses in 1989 Canadian dollars)

Act consistently with the public’s environmental values

About local environmental impacts

To flora (hectares of mature forest lost)

To fauna (hectares of wildlife habitat lost of Spatzizi Plateau quality)

To wildlife ecosystems hectares of wilderness lost of the Stikine Valley quality)

To limit recreational use (hectares of high quality recreational land lost)

To aesthetics (annual person-years viewing high voltage transmission lines in quality terrain)

About global impacts (generation capacity in megawatts that results in “fossil fuel” pollution)

Minimize detrimental health and safety impacts

To the public

Mortality (public person-years of life lost)

Morbidity (public person-years of disability equal in severity to that causing employee lost work time)

To employees

Mortality (employee person-years of life lost)

Morbidity (employee person-years of lost work time)

Promote equitable business arrangements

Equitable pricing to different customers (constructed scale, see text)

Equitable compensation for concentrated local impacts (number of individuals that feel they are inequitably treated)

Maximize quality of service

To small customers

Minimize outages (expected number of annual outages to a small customer annually)

Minimize duration of outages (average hours of outage per outage to small customers)

To large customers

Minimize outages (expected number of annual outages to a large customer annually)

Minimize duration of outages (average hours of outage per outage to large customers)

Improve new service (elapsed time until new service is installed)

Improve response to telephone inquiries (time until human answers the telephone)

Be recognized as public service oriented (constructed scale, see text) SOURCE: Keeney and McDaniels, 1992.

The Use and Storage of Methyl Isocyanate (MIC) at Bayer CropScience Copyright National Academy of Sciences. All rights reserved. A FRAMEWORK FOR DECISION MAKING 121 BOX 6.2 MAU Informs Materials Choices in the Automotive Industry

As an example of practical application of MAU to inform system de­ sign in industry, consider the example of choosing materials for automo­ bile frames and skins presented in Thurston (1990). Thurston designed a MAU model for use by a French automobile manufacturer working on long-range plans for its future vehicle fleets (those to be manufactured in the next 5-10 years). The company’s design engineers faced three ­options for vehicle frame-and-skin systems:

Traditional steel uni-body,

Internal steel frame with nonstructural external polymer composite skin, and

Steel and polymer composite frame with polymer composite skin.

The design engineers were perplexed about which material choice to pursue, because although steel could be produced with the lowest operating cost, it did not perform as well along other attributes (including durability and flexibility) as the other choices. Thurston, in describing this case study, noted, “When decision makers are faced with several alterna­ tive systems, each system may be represented as a bundle of seemingly incommensurate attributes. The best choice is not always clear.” In this case, the automotive company, with support from decision analysts, used a MAU model to help decide which of the three vehicle frame-and-skin systems maximized the utility to the company, given the need to trade-off cost and performance attributes.

Thurston interviewed the decision makers at the company (in this case, engineering materials design managers focused on long-term fleet planning) to determine which attributes were important in their decision. The decision makers identified five attributes:

Capital cost (billions of francs),

Operating cost (francs per vehicle),

Weight (kg),

Corrosion resistance (years of resistance to corrosion), and

Design flexibility (number of body styles possible per platform).

With the company’s engineers, Thurston then measured the perfor­ mance of each of the three materials options along these five attributes. Table 6.3 shows the results. continued

The Use and Storage of Methyl Isocyanate (MIC) at Bayer CropScience Copyright National Academy of Sciences. All rights reserved. 122 USE AND STORAGE OF METHYL ISOCYANATE (MIC) AT BAYER CROPSCIENCE

Next, through in-person and electronic surveys of the decision ­makers, Thurston determined an appropriate form for the MAU function—in this case, multiplicative: KU x Kk U x 1 1 i i i i n 1∏ ) ( ) ( ) (

+

+

Thurston then assessed the individual utility functions Ui(xi) for each of the five attributes, again through surveys of the decision makers, and the scaling constants ki for each utility function, as well as the overall scaling constant K. As an example, Figure 6.1 shows single-attribute utility functions for operating cost and flexibility in number of body types possible per platform.

As shown, these single-attribute functions convert the levels of each option along each attribute to a value between 0 and 1 that reflects the decision makers’ tolerance of risk. For example, the concave shapes of these utility functions show that the decision maker is risk averse in preferences for capital costs and flexibility, gaining more from initial incremental cost savings and design flexibility than from subsequent increments.

Figure 6.2 shows the resulting attribute scores and rankings of the three design alternatives. As shown, the steel frame with polymer com­ posite skin option has the highest utility. This result was counter-intuitive to the decision makers, since the polymer composite skin-and-frame option scored highest along four of the five attributes, including capital costs. However, the high variable costs of this latter system outweighed the benefits along the other four attributes. Thus if the decision makers TABLE 6.3  Alternative Automotive Frame-and-Skin Systems and Their Performance Along Key Attributes Design Capital Cost (Billion Francs) Operating Cost (Francs per Vehicle) Weight (Kilos) Design Flexibility (Number of Bodies per Platform) Corrosion Resistance (Years) Steel Uni-body 3 30 500 1 5 Steel Frame; PC Skin 2 40 425 5 15 Steel and PC Frame; PC Skin 1.5 45 350 5 15 SOURCE: Reproduced from Thurston, 1990. BOX 6.2 Continued

The Use and Storage of Methyl Isocyanate (MIC) at Bayer CropScience Copyright National Academy of Sciences. All rights reserved. A FRAMEWORK FOR DECISION MAKING 123 FIGURE 6.1  Single-attribute utility functions for cost and flexibility for the auto industry case study described in Box 6.2. Note that the dots represent points on the utility function assessed through structured interviews with the company’s decision makers. SOURCE: Thurston, 1990. continued

The Use and Storage of Methyl Isocyanate (MIC) at Bayer CropScience Copyright National Academy of Sciences. All rights reserved. 124 USE AND STORAGE OF METHYL ISOCYANATE (MIC) AT BAYER CROPSCIENCE had chosen the option that seemed intuitively to be the right choice, this decision would not have accurately reflected their true preferences. BOX 6.2 Continued FIGURE 6.2  Attribute levels and final rankings of the alternative auto frame- and-skin designs discussed in Box 6.2. SOURCE: Thurston, 1990. tenets of rational decision theory (Kahneman et al., 1982). Decision analysis, by providing a framework for the decision process, can help overcome the well- known human cognitive limitations that can lead to less-than-optimal decision- making (Clemen and Reilly, 2001). It is also important to recognize that, as with any modeling system, the quality of the data used in the analysis is critical, and care must be taken to ensure that the inputs collected from the various stakeholder communities—utility values for MAU—accurately represent their views. Limitations of Existing Inherent Safety Indexes Chemical engineers in the field of ISP design have conceived a number of summary indexes intended to capture the trade-offs in objectives embodied by

The Use and Storage of Methyl Isocyanate (MIC) at Bayer CropScience Copyright National Academy of Sciences. All rights reserved. A FRAMEWORK FOR DECISION MAKING 125 different design options. Examples include the integrated inherent safety index (I2SI) and a set of European Union (EU) indexes known as the INSET Toolkit. (For descriptions of these methods, see Chapter 4 and Khan and Amyotte, 2004.) When considered from a formal decision analysis perspective, these indexes have a number of limitations, both theoretical and practical. The main theoreti- cal weakness is that the indexes were not designed to follow the von Neumann- Morgenstern model of rational choice, so there is no guarantee that the index value for a given manufacturing process will be able to reflect a given decision maker’s actual preferences and attitudes toward risk. Perhaps more importantly, these indexes—in contrast to a MAU approach—do not allow for the possibility of multiple decision makers with different preferences. As an example, consider the I2SI index (Khan and Amyotte, 2004). This index is intended to combine assessments of multiple inherent safety attributes into a single numeric value. The equation for computing this index is:

I SI ISI PHCI HI PHCI 2 alt alt base

base

(6.3) where ISIalt, PHCIalt, HIbase, and PHCIbase are all subindexes computed as func- tions of various process design attributes. For each manufacturing process con- sidered, the ratio HIbase/PHCIbase is the same, so that when comparing multiple alternatives the above equation reduces to:

I SI c ISI PHCI c Min ISI PHCI 2 {200, } alt alt i i j j 2 1 5 1 10 ∑

∑

×

×

=

(6.4) where c is a constant and the summation terms in the equation represent the attri- butes listed in Table 6.4. The values for the summation terms are determined from a combination of subjective judgments about the degree to which each process unit satisfies the principles of ISP. An index such as the I2SI provides a single calculation that cannot be adjusted to reflect the variation in preferences among attributes and willingness to tolerate risk that different constituencies may exhibit. For example, a company owner may be willing to tolerate a small risk of a spill that could have health effects in the community if the alternative involved a much higher risk of a fire that would seriously damage the facility, whereas members of the community may not accept such a trade-off, and employees of the firm (who place some value on keeping the facility intact in order to retain their jobs) may prefer something in between the owner and the community. In addition to putting different weights

The Use and Storage of Methyl Isocyanate (MIC) at Bayer CropScience Copyright National Academy of Sciences. All rights reserved. 126 USE AND STORAGE OF METHYL ISOCYANATE (MIC) AT BAYER CROPSCIENCE TABLE 6.4  Attributes Included in the I2SI (Equation 6.4) Attribute Category : Adherence to principles of inherently safer design Attribute Description Representation in I2SI Equations Extent to which process minimizes use of hazardous materials ISI1 = ISIm Extent to which process substitutes safer materials for more hazardous ones ISI2 = ISIsu Extent to which process attenuates risks by operating under safer conditions (e.g., room temperature and pressure) ISI3 = ISIa Extent to which process simplifies manufacturing (e.g., by avoidance of multiproduct or multiunit operations or congested pipe or unit settings) ISI4 = ISIsi Extent to which process limits potential negative consequences of out-of- normal operations (e.g., by unit segregation) ISI5 = ISIl Attribute Category : Need for add-on processes to control hazards Attribute Description Representation in I2SI Equations Pressure control required PHCI1 = PHCIp Temperature control required PHCI2 = PHCIt Flow control required PHCI3 = PHCIf Level control required PHCI4 = PHCIl Concentration control necessary PHCI5 = PHCIc Inert venting necessary PHCI6 = PHCIiv Blast wall needed PHCI7 = PHCIbw Fire resistance wall needed PHCI8 = PHCIfr Sprinkler system necessary PHCI9 = PHCIs Forced dilution needed PHCI10 = PHCId on different attributes, a MAU model can reflect differences in risk tolerances in the form of the utility function: linear functions represent risk neutrality; concave functions represent a preference for gambling on high risks that have potentially high payoffs; and convex functions represent risk aversion (for details, see Cle- men and Reilly, 2001). The existing indexes are the proverbial black box: input a set of numbers based on the process being evaluated, and the index produces a single value for each alternative, which is then used to rank the different alternatives and identify the optimal decision. All of the trade-offs, uncertainties, and risk tolerances are hidden from view because they are implicitly assumed in the underlying calcula- tions, rather than explicitly chosen parameters. Because these indexes implicitly assume one value structure, the effects of alternative value structures on the pref- erence ordering of the alternatives cannot be assessed. Indeed, because the trade- offs in the index are completely opaque (to the analysts as well as to ­others), it is unlikely that companies will be able to use such indexes to build trust within the communities in which their facilities are located. A more transparent approach,

The Use and Storage of Methyl Isocyanate (MIC) at Bayer CropScience Copyright National Academy of Sciences. All rights reserved. A FRAMEWORK FOR DECISION MAKING 127 that is, one that makes the trade-offs in attributes and risk tolerances explicit, is needed if the outcomes of ISP assessments are to be widely embraced. EMPLOYING MAU MODELS IN ISP ASSESSMENTS The existing inherent safety indexes could serve as a starting point for building MAU functions to inform process design choices, with inherent safety in mind. For ISP design, fundamental objectives have been described as elimi- nation, minimization, substitution, moderation, and simplification. The indexes provide useful starting points for constructing MAU functions in that they identify a number of the attributes by which progress along these fundamental objectives could be measured. For example, the attributes in the I2SI include costs associated with any damage that might occur due to a safety breach and costs associated with a process control option under consideration. Other attributes that could be included might be the number of fatalities that could occur in an accident and the potential loss of community goodwill (which can lead to additional costs for the company in its future decision-making). CCPS (1996), mentioned at the beginning of this chapter, provides an illustration of the use of MAU to choose a process control device for a hypothetical chemical distillation column. EMPLOYING MAU MODELS AT BAYER CROPSCIENCE MAU and ISP decision-making tools could have been used to inform manu- facturing process design choices at numerous points in the history of the Institute pesticide plant, starting with the introduction of MIC to the site in 1978. As noted in Chapter 5, changes to the production process made at the Institute facility were generally considered in response to business conditions or external pressures, without explicit consideration of ISP principles. Several of these decision points could have provided opportunities to introduce MAU approaches, which would have recognized the multi-attribute nature of the decision and the differences in preferences between the firm and the community, perhaps resulting in a decision- making process that would have been more acceptable to the community. That, in turn, might have allowed production to continue at the plant in some form. Chapter 5 mentions the 1984 Bhopal accident and the 2008 methomyl acci- dent as significant opportunities for broadening the approach to decision making at Institute. Other opportunities arose when the plant changed ownership. Choices that better accounted for the multiple costs and benefits involved—including the costs associated with risks imposed on the community—could have prevented the types of accident risks that persisted until the use of MIC ceased at the site. Without such a multi-attribute decision framework in place, the decisions at the Institute site seem to have focused on production costs and the business risk of interrupting the flow of product to the market, which resulted in the decision to

The Use and Storage of Methyl Isocyanate (MIC) at Bayer CropScience Copyright National Academy of Sciences. All rights reserved. 128 USE AND STORAGE OF METHYL ISOCYANATE (MIC) AT BAYER CROPSCIENCE continue with the same basic production process with some modifications rather than adopting an entirely new approach. This bias in favor of an existing production process is not surprising and may even reflect the optimal decision, especially from the company’s point of view. “Steel in the ground” is a powerful motivator. It avoids the up-front capital costs of a new process, along with any uncertainties about how well the process will operate or what its operating cost will be. Critically and objectively reviewing a process that has been in operation for many years can be difficult for those work- ing at a chemical production facility. For example, from a practical standpoint, it is likely that, over time, a given process will have been modified from its initial design. Minor changes in procedures, modifications to existing equipment, and the effect of age and maintenance on the system must be taken into account dur- ing the trade-off analysis. This may be challenging if, due to staffing changes or insufficient documentation, the modifications from the initial design have not been recorded. In addition, alternative processes may always seem “hypothetical,” and concerns about risks expressed by community members may be ascribed to their lack of understanding of the process and its many layers of safety protec- tions. These factors make it difficult to apply MAU (and ISP) analyses to exist- ing plants in ways that can really identify promising alternatives to the existing process. Implementing a structured, multi-attribute decision process such as MAU analysis may be easier when designing a new production process or an entirely new facility. In such cases, no incumbent process has an advantage in terms of capital costs or production uncertainties, since all the alternative processes are new and hence hypothetical. In addition, the company may be involved in negoti- ations with regulators—who, in turn, are considering the concerns of community groups—in order to obtain an operating permit, so the need to address concerns held by those outside the facility will be more salient. During these initial inter- actions between the facility and its neighbors, a MAU analysis could serve to educate community members about the trade-offs between risks and economic considerations of importance to the company, while informing the company of the community’s concerns about different types of production risks. However, conducting a MAU analysis for the MIC issue would not neces- sarily have resulted in different decisions by the companies owning the Institute plant. Especially using the company’s own valuation on the multiple attributes of the alternatives, continuing with the existing MIC process might well have seemed optimal. The advantage that would be gained from using multi-criteria analysis is that the company would have explicitly identified the most important attributes of the alternative processes and assigned a valuation to those attributes. Using MAU could also have provided a calculation into which the preferences of others (e.g., community members) could easily be incorporated.

The Use and Storage of Methyl Isocyanate (MIC) at Bayer CropScience Copyright National Academy of Sciences. All rights reserved. A FRAMEWORK FOR DECISION MAKING 129 CONCLUSIONS No one carbamate pesticide production process dominates all the ­others along every attribute that owners of the Institute site considered or could have consid- ered. However, given the necessary trade-offs, a decision-analysis approach, such as MAU, could have helped the various plant owners consider all aspects of their choices. A decision analysis approach might also have facilitated the communi- cation process between the company and the surrounding community, allowing the two groups to compare their preferences regarding the decision attributes and their potentially differing tolerances and attitudes toward risk. Although the CCPS has advocated for the development of such an approach since 1995, it has not become institutionalized in the chemical process industry. A new decision- making framework, incorporating some of the work done to develop exist- ing ISP indexes but also allowing explicit consideration of differences in decision makers’ preferences across multiple attributes, could assist in the incorporation of ISP considerations into decision making in the chemical manufacturing industry and communication of those considerations to a concerned public. Design decisions cannot be strictly objective with regards to ISP as these choices will always require trade-offs among attributes and varying levels of risk; different individuals or constituencies may have different value systems and thus make different trade-offs. However, a new decision framework could support incorporation of the attributes in existing indexes, while adhering, and drawing benefit from, the mathematics of multi-attribute or -criteria decision analysis. The committee recommends that the Chemical Safety Board or other appropriate entity convene a working group to chart a plan for incorporat- ing decision theory frameworks into ISP assessments. The working group should include experts in chemical engineering, ISP design, decision sciences, negotiations, and other relevant disciplines. The working group should iden- tify obstacles to employing methods from the decision sciences in process safety assessments. It should identify options for tailoring these methods to the chemical process industry and incentives that would encourage their use. REFERENCES Belton, V.,and T. S. Stewart. 2002. Multiple Criteria Decision Analysis: An Integrated Approach. Norwell: Klumber Academic Publishers. Bunn, D. W. 1984. Applied Decision Analysis. New York: McGraw-Hill. CCPS (Center for Chemical Process Safety). 1995. Tools for Making Acute Risk Decisions with Chemical Process Safety Applications. New York: American Institute of Chemical Engineers. Clemen, R. T., and T. Reilly. 2001. Making Hard Decisions with Decision Tools. Belmont, CA: Duxbury Press. DeBrucker, K., Macharis, C., and A. Verbeke. 2012. Multi-criteria analysis and the resolution of sustainable development dilemmas: a stakeholder management approach. European Jounral of Operational Research. Available online.

The Use and Storage of Methyl Isocyanate (MIC) at Bayer CropScience Copyright National Academy of Sciences. All rights reserved. 130 USE AND STORAGE OF METHYL ISOCYANATE (MIC) AT BAYER CROPSCIENCE Figueira, J., S. Greco, and M. Ehrgott. 2005. Multiple Criteria Decision Analysis: State of the Art Surveys. New York: Springer Science and Business Media, Inc. French, S. 1986. Decision Theory: An Introduction to the Mathematics of Rationality. Chichester: Ellis Horwood. Kahneman, D., P. Slovic, and A. Tversky. 1982. Judgment Uner Uncertainty: Heuristics and Biases. Cambridge, UK: Cambridge University Press. Keefer, D. L., C. W. Kirkwood, and J. L. Corner. 2004. Perspective on decision analysis applications, 1990-2001. Decision Anal. 1(1):4-22. Keeney, R., and T. McDaniels. 1992. Value-focused thinking about strategic decisions at BC. Hydro. Interfaces 22(6):94-109. Keeney, R., and H. Raiffa. 1976. Decisions with Multiple Objectives: Preferences and Value Tradeoffs. New York: Wiley. Khan, F. I., and P. R. Amyotte. 2004. Integrated Inherent Safety Index (I2SI): A tool for inherent safety evaluation. Process Saf. Prog. 23(2):136-148. Raiffa, H., J. Richardson, and D. Metcalfe. 2002. Negotiation Analysis: The Science and Art of Col- laborative Decision Making. Boston: Belknap Harvard. Thurston, D. L. 1990. Multiattribute utility analysis in design management. IEEE Trans. Eng. Man- age. 37(4):296-301. von Neumann, J., and O. Morgenstern. 1947. Theory of Games and Economic Behavior, 2nd Ed. Princeton, NJ: Princeton University Press. von Winterfeldt, D., and W. Edwards. 1986. Decision Analysis and Behavioral Research. Cambridge, UK: Cambridge University Press.

The Use and Storage of Methyl Isocyanate (MIC) at Bayer CropScience Copyright National Academy of Sciences. All rights reserved. 7 Process Safety Management at Bayer CropScience 131 All safety assessments and practices exist within the context of an organiza- tion, and as a result, the environment in which a company operates and the safety culture that it fosters within its walls affect the efficacy of any hazard control system. This chapter presents process safety management (PSM) from both a general perspective and with specific reference to the system implemented at Bayer CropScience (Bayer) and considers the context in which this system oper- ates in Institute, WV. This chapter also addresses Bayer’s use of inherently safer process (ISP) assessments conducted by Bayer within their PSM system, as well as the context in which these assessments were considered. PSM—GENERAL CONSIDERATIONS PSM is a concept well familiar to the global chemical engineering community. These PSM systems, described in Chapter 4, are conceptual and management frameworks developed to aid in the control of hazards on site. The components of any given PSM system may vary somewhat between countries and organiza- tions, but the fundamental structures remain similar. These systems make explicit the understanding that controlling a hazard—whether physical, toxic, electrical, etc.—requires a sociotechnical system, and therefore, requires engagement at all levels of an organization. For example, if ventilation is required to maintain a safe environment, purchase of the equipment required to provide that ventilation is only one piece of the sociotechnical system. There must also be adequate training of personnel so that they know how and when to use the equipment, monitoring of the equipment’s performance and employee’s compliance with safety protocols, emergency response protocols in case the equipment fails, periodic auditing of the

The Use and Storage of Methyl Isocyanate (MIC) at Bayer CropScience Copyright National Academy of Sciences. All rights reserved. 132 USE AND STORAGE OF METHYL ISOCYANATE (MIC) AT BAYER CROPSCIENCE protocols regarding ventilation by management to proactively identify and address any emerging concerns or new understandings about the risk posed by a given material, etc. These systems have been developed in response to the knowledge that once a hazard and its risks are brought into an environment, the risk “remains, waiting for an opportunity to happen unless the management system is actively monitoring company operations for concerns and taking proactive actions to cor- rect potential problems” (Amyotte et al., 2007). Having an effective management system for process-related hazards—fire, explosion, and toxic release—is therefore considered by many in the chemical process industries to be a critical corporate objective. Formally, PSM is defined as the application of management principles to the identification, understanding, and control of process hazards to prevent process-related incidents OSHA’s PSM standard, 29 CFR § 1910.119. Various approaches exist for PSM. One example is the 1989 system developed by the Center for Chemical Process Safety (CCPS, 1989), which served as the basis for a 12-element system recommended by the Canadian Society for Chemical Engineering (CSChE, 2002). More recently, the CCPS has developed guidance on a 20-element, risk-based approach to managing process safety (CCPS, 2007); see Table 7.1. Within the United States, OSHA administers Process Safety Management of Highly Hazardous Chemicals standard 29 CFR § 1910.119, which defines requirements for handling of those materials. It consists of 16 elements, 14 of which are mandatory. PSM AT BAYER CROPSCIENCE As most companies do, Bayer CropScience has its own PSM system. ­Bayer’s 14-element system is shown in Table 7.2, with noted similarities between this system and the CCPS-developed listing in Table 7.1. For this discussion, Bayer’s element 4, Process hazard analysis, is most relevant. This analysis consists of the following steps (Patrick Ragan, Bayer CropScience unpublished material, August 8, 2011):

  1. Hazard identification (using a variety of methods including preliminary

safety analysis; hazard and operability study (HAZOP); what-if review; check- list review; what-if/checklist review; fault tree analysis; event tree analysis; and failure modes, effects and criticality analysis (FMECA);

  1. Severity determination;
  2. Probability determination;
  3. Risk assessment (using a risk matrix); and
  4. Risk management (including application of risk reduction measures).

Within step five, the list of preventive safety measures given includes pas- sive, active, and procedural measures for hazard control, but there is no specific requirement to consider ISP measures.

The Use and Storage of Methyl Isocyanate (MIC) at Bayer CropScience Copyright National Academy of Sciences. All rights reserved. PROCESS SAFETY MANAGEMENT AT BAYER CROPSCIENCE 133 TABLE 7.1  Risk-Based Process Safety Management System Accident Prevention Pillar Risk-Based Process Safety Element Commit to process safety Process safety culture Compliance with Standards Process safety competency Workforce involvement Stakeholder outreach Understand hazards and risk Process knowledge management Hazard identification and risk analysis Manage risk Operating procedures Safe work practices Asset integrity and reliability Contractor management Training and performance assurance Management of change Operational readiness Conduct of operations Emergency management Learn from experience Incident investigation Measurement and metrics Auditing Management review and continuous improvement SOURCE: Adapted from CCPS (2007). TABLE 7.2  Bayer CropScience System for PSM of Hazardous Chemicals Focus Element Commitment

  1. Leadership and culture
  2. Employee participation

Understanding risk

  1. Process safety information
  2. Process hazard analysis

Managing risk

  1. Operating procedures
  2. Training
  3. Contractors
  4. Pre-Startup safety review
  5. Mechanical integrity
  6. Safe work practices
  7. Management of change

Response and corrective action

  1. Incident investigation
  2. Emergency planning and response
  3. Compliance audits

SOURCE: Provided by Patrick Ragan, Bayer CropScience, on August 8, 2011.

The Use and Storage of Methyl Isocyanate (MIC) at Bayer CropScience Copyright National Academy of Sciences. All rights reserved. 134 USE AND STORAGE OF METHYL ISOCYANATE (MIC) AT BAYER CROPSCIENCE ISP ASSESSMENTS AT BAYER CROPSCIENCE Although claimed to be an integral PSM component, inherent safety considerations are incorporated into Bayer’s PSM efforts in an implicit man- ner that is dependent on the knowledge base of the individual facilitating the particular activity (e.g., process hazard analysis or PHA). Although an implicit system of ISP incorporation does not mean an absence of a commitment to inherent safety, it does mean that the commitment is not visible to the extent that could be considered desirable. The disadvantage of an implicit system of ISP is corporate memory. The extensive work of Professor Trevor Kletz over several decades of process safety research, practice and writing has clearly demonstrated that organizations do not generally have a long-term memory—at least not a memory longer than about 10 years. Corporate memory resides with individuals, and individuals retire, resign, or otherwise move on to other opportunities. While acknowledging the value of individual memory and active sharing of information between employees, if ISP consideration requirements are not explicitly recorded within the suite of PSM documentation, then such requirements may be forgotten or potentially ignored. It would be beneficial for Bayer to formally incorporate ISP assessment into the company’s PSM system and training and to record such assessments as part of its audit and review processes. Doing so would provide regular opportunities to update the assessment protocols in light of any new developments in the area. As mentioned in Chapter 4, descriptions on how ISP considerations can be incorporated into all elements of a PSM system are available. These include spe- cific suggestions for training initiatives using the various ISP resources. Recom- mendations are also given regarding compliance audits related to identification and implementation of ISP. Both of these elements (training and audits) would seem particularly relevant to the case of Bayer CropScience and the Institute facility. Documented training of personnel with respect to the concept of inher- ent safety, for example, would contribute to creating and maintaining a consistent level of knowledge within the organization and formalize corporate memory in this area. In the course of reviewing the materials provided by Bayer CropScience regarding the alternatives assessment performed by Bayer and the previous ­owners of the facility and the design of the post-2008 facility redesign, it was clear that safety considerations did come into play in the analysis. However, the focus of the alternatives assessments and the redesign was primarily directed toward managing the hazard rather than eliminating or reducing it, which is con- sistent with the focus on passive, active, and procedural controls within the PSM. Appendix B provides a detailed history of process changes that occurred at the Institute facility, and points where ISP-type decisions were made are highlighted. A summary of specific examples of the process changes that occurred are listed in Box 7.1. For example, every time a significant reduction of MIC inventory

The Use and Storage of Methyl Isocyanate (MIC) at Bayer CropScience Copyright National Academy of Sciences. All rights reserved. PROCESS SAFETY MANAGEMENT AT BAYER CROPSCIENCE 135 BOX 7.1 Summary of Process Design Changes with Implications for Safety at the Institute Facility Consistent with ISP Principles • Union Carbide Company (UCC) practiced principles of sustainability in 1978 when it switched from the chloroformate process to the ­isocyanate process for carbaryl production achieving higher yields, less waste, less corrosion, and less environmental impact. • UCC practiced passive and active safety strategies in 1978 and 1985 in the design of the MIC process featuring refrigerated underground stor­ age, emergency scrubbers, and emergency flares. • UCC followed ISP principles in its search for alternative chemistries to MIC prior to 1985. • UCC followed ISP principles in its focus on less hazardous MIC- adducts in 1986 (for remote production to avoid aldisol transportation). • Rhône-Poulenc practiced passive and active safety strategies in 1988 with MIC incinerator and carbaryl reliability optimization, and ISP prin­ ciples with MIC downsizing measures (Project MN). • Rhône-Poulenc followed ISP principles in 1989 to 1991 in the evalua­ tion and design of Enichem phenylmethylcarbamate process with cracking at remote (Project MS) or at four individual carbamate plants in Institute, eliminating MIC storage and transport and reducing total MIC inventory for all carbamate production to a few hundred pounds. However, this process was not implemented. • Rhône-Poulenc practiced passive and active safety strategies in its 1993 Institute Modification Project. • The Rhône-Poulenc 1994 Risk Management Plan contains passive, active, and mostly procedural safety elements. • Bayer followed ISP principles in modeling and analyzing the opera­ tional impacts of reducing MIC inventory. • Bayer MIC Unit Layers of Protection strategy contains mostly passive and active and some inherent safety elements. • Bayer (Project MINEXT) practiced ISP in 2010 by closing the West Carbamoylation Center and by reducing carbamate production to two products and reducing MIC inventory by 80 percent, and practiced pas­ sive and active safety strategies by eliminating aboveground storage, and using double-walled construction, steam-ammonia curtains, and other measures. • Bayer followed ISP principles in 2010 by evaluating alternative chem­ istries for the production and use of gaseous (instead of liquid) MIC, including chemistries avoiding the use of phosgene (although none was evaluated to be competitive or timely in the present business environment). • Bayer also followed ISP principles in 2010 by substituting a non­ reactive material for brine in the MIC storage tank refrigeration systems.

The Use and Storage of Methyl Isocyanate (MIC) at Bayer CropScience Copyright National Academy of Sciences. All rights reserved. 136 USE AND STORAGE OF METHYL ISOCYANATE (MIC) AT BAYER CROPSCIENCE occurred, one aspect of the philosophy of ISP (reduction) was implemented, even if that term was not used. Since ISP was not a formal consideration for the facility’s owners, the committee finds that the managers of the facility in Institute missed opportuni- ties to perform full safety assessments. Bayer CropScience did perform PSM assessments, however, Bayer and the legacy companies did not perform systematic and complete ISP assessments on the process for manufacturing MIC or the processes used to manufacture pesticides at the Institute site. Bayer and the previous owners performed various hazard and safety assess- ments and made certain business decisions that resulted in MIC inventory reduction, elimination of aboveground MIC storage, and adoption of various passive, active, and procedural safety measures. However, these assessments did not incorporate, in an explicit and structured manner, the principles of minimization, substitution, moderation, and simplification. The legacy owners identified possible alternative methods that could have resulted in a reduction in MIC production and inventory, but determined that limita- tions of technology, product purity, cost, and other issues prohibited their implementation. ISP ASSESSMENTS—EXTERNAL CONTEXT Because Bayer implicitly uses ISP practices and principles within their PSM system (e.g., reducing inventory of MIC and acknowledging the safety benefit drawn from that), it is a useful exercise to consider what incentives could exist for the explicit incorporation of ISP assessments into the PSM system. Indeed, within the industry broadly, there are barriers to the formal consideration of ISP including the perception that inherent safety is impractical, or costly, that there is a lack of institutional infrastructure and frameworks for evaluating inherently safer processes, and a lack of standards and guidance measures for existing opera- tions (CCPS, 2008). The purpose of this section of the report is not to endorse one method or another for encouraging the adoption of ISP. Rather it is to provide a brief overview of possible drivers and barriers to formal, explicit consideration of ISP by a company. One possible mechanism for overcoming these barriers is through profes- sional standards within the field of chemical engineering. Inherently safer pro- cess assessments are a valuable component of process safety management. However, as noted in Chapter 4, at this time the view of what constitutes an inherently safer process varies among professionals, so the chemical industry lacks a common understanding and set of practice protocols for identifying safer processes. Externally, industry standards could affect the formal incorporation of ISP into PSM. It is clear that companies look to professional organizations, such as CCPS, for guidance on these issues. Alternatively, were ISP to be incorporated

The Use and Storage of Methyl Isocyanate (MIC) at Bayer CropScience Copyright National Academy of Sciences. All rights reserved. PROCESS SAFETY MANAGEMENT AT BAYER CROPSCIENCE 137 into the standards of the American Chemistry Council Responsible Care Pro- gram, for example, it would likely encourage adoption of ISP concepts into PSM methodologies. Of course, regulatory policy could drive companies’ adoption of ISP ­analyses. In Chapter 4, Box 4.1 presented definitions of ISP, including two drawn from regu- latory policy initiatives within the United States that require consideration of ISP. In reviewing those policies, it is clear that the link between ISP strategies and the framework set down by cleaner production and pollution prevention regulations is seen as a starting place for considering the role of ISP in context (Zwetsloot and Ashford, 2003). It is important to remember, however, that the effective implemen- tation of ISP relies on the awareness of the professional, technical community, and studies (Wilson et al., 2008; Copsey, 2010) have highlighted the need to improve links between workforce preparation and industry knowledge of inherently safer strategies for risk reduction. In the United States, companies are required to have PSM systems in place for handling of highly hazardous chemicals. However, the elements of OSHA’s PSM (29 CFR § 1910.119) standard do not require any explicit consideration of ISP. Rather the requirements accept the presence of a hazard, and the risks that may come with its use, and are thus directed to the tiers of the PSM hierarchy geared toward control and management of the hazard and its risk rather than elimination of the hazard itself. The PSM elements required by OSHA were presented in detail in Chapter 2 and are listed in Table 7.3. The U.S. Environmental Protection Agency (EPA) policy has considered the possibility of inherent safety at least since the early 2000s, but measures regarding chemical accident prevention have tended to focus on prior planning and “inspection and . . . corrective and preventive maintenance.” (Ashford and ­Zwetsloot, 1999). Therefore, the concept of safety planning is far from new, but TABLE 7.3  Fourteen Required Elements of OSHA’s PSM Standard • Process safety information, • Process hazard analysis, • Operating procedures, • Employee participation, • Training, • Contractors, • Pre-startup safety review, • Mechanical integrity, • Hot work, • Management of change, • Incident investigation, • Emergency planning and response, • Compliance audits, and • Trade secrets.

The Use and Storage of Methyl Isocyanate (MIC) at Bayer CropScience Copyright National Academy of Sciences. All rights reserved. 138 USE AND STORAGE OF METHYL ISOCYANATE (MIC) AT BAYER CROPSCIENCE the far-reaching ramifications of ISP appear to require a greater degree of plan- ning and technological investment than do traditional safety strategies that tend to be “failsafe” rather than “foolproof.” (Ashford and Zwetsloot, 1999). The difficulties of implementing ISP also can be observed in the EPA Risk Management Program (RMP) (EPA, 2001), which is still intentionally more oriented to risk management than risk prevention (Malloy, 2008), and as a policy matter does not mandate ISP. Nevertheless, companies dealing with hazardous chemicals must develop accident prevention plans during hazard emergency response planning, but this policy does not extensively involve stakeholders out- side of firms (CCPS, 2009). Other pertinent regulations and laws include the Pollution Prevention Act (PPA), which is not primarily directed at accidents (Ashford and Caldhart, 2010), and the Department of Homeland Security’s Chemical Facility Anti-Terrorism Standards (CFATS) (Malloy, 2008). The post-September 11 approach is particu- larly amenable to ISP (CCPS, 2009), because the unpredictable nature of terror- ist attacks may create challenges for traditional assessments based on internal production risks. However, regulatory bodies have tended to conclude that ISP shift rather than prevent risks (Malloy, 2008). This is an important critique that warrants further research, because of the possibility that inherently safer technol- ogy may lead to the reallocating of risk to other areas of the production process (Hendershot, 2010). The previous paragraphs were a brief overview of the policy context for ISP. More information, including international initiatives, can be found in Appendix D. Finally, in regard to the perception of cost barriers to ISP, it is important to recognize that for most established manufacturing processes, the materials in use, whether hazardous or not, are cost competitive, and shifts to lower risk technol- ogy or process design can involve costs and uncertainties for companies (CCPS 2009). This being the case, these cost issues, and/or the perception of them, present a major practical barrier for industry to adopting safer processes (­Malloy, 2008). However, greater production stability associated with inherently safer technology may lead to “greater reliability of production” and operations econo- mies (Ashford and Zwetsloot, 1999; Malloy, 2008), which, if applicable, can be seen as an overall benefit to the company. As discussed earlier in this report, however, the costs associated with redesigning an existing facility mean that the barriers posed by these costs will be much lower when incorporated into an initial design or as part of a planned, significant modification of an existing site.

The Use and Storage of Methyl Isocyanate (MIC) at Bayer CropScience Copyright National Academy of Sciences. All rights reserved. PROCESS SAFETY MANAGEMENT AT BAYER CROPSCIENCE 139 REFERENCES Amyotte, P. R., A. U. Goraya, D. C. Hendershot, and F. I. Khan. 2006. Incorporation of inherent safety principles in process safety management. Pp. 175-207 in 21st Annual Center for Chemical Process Safety International Conference on Process Safety Challenges in a Global Economy. New York: American Institute of Chemical Engineers. Amyotte, P. R., A. U. Goraya, D. C. Hendershot, and F. I. Khan. 2007. Incorporation of inherent safety principles in process safety management. Process Saf. Prog. 26(4):333-346. Ashford, N., and C. Caldhart. 2010. Government regulation of environmental and occupational health and safety in the United States and the European Union. Chapter 30 in Occupational and Envi- ronmental Health: Recognizing and Preventing Disease and Injury, 6th Ed., B. S. Levy, D. H. Wegman, R. Sokas, and S. Baron, eds. Oxford, UK: Oxford University Press [online]. Available: http://hdl.handle.net/1721.1/55358 or from http://18.7.29.232/bitstream/handle/1721.1/55358/ Chapter-30%20_GovRegOfEnvl%26OccH_9Feb10.pdf?sequence=1. Ashford, N., and G. Zwetsloot. 1999. Encouraging inherently safer production in European firms: A report for the field. J. Hazard. Mater. 78:123-144 [online]. Available: http://dspace.mit.edu/ bitstream/handle/1721.1/1582/ISPRA.pdf?sequence=1. CCPS (Center for Chemical Process Safety). 1989. Guidelines for Technical Management of Chemical Process Safety. New York: American Institute of Chemical Engineers CCPS. CCPS. 2007. Guidelines for Risk Based Process Safety. Hoboken, NJ: John Wiley & Sons. CCPS. 2008. Guidelines for Hazard Evaluation Procedures, 3rd Ed. Hoboken, NJ: John Wiley & Sons. CCPS. 2009. Inherently Safer Chemical Processes: A Life Cycle Approach, 2nd Ed. Hoboken, NJ: John Wiley & Sons. Copsey, S., ed. 2010. Mainstreaming Occupational Safety and Health into University Education. Luxembourg: European Agency for Safety and Health at Work, Publications Office of the Euro- pean Union [online]. Available: http://osha.europa.eu/en/publications/reports/mainstream_osh_ university_education. Accessed: Oct. 3, 2011. CSChE (Canadian Society for Chemical Engineering). 2002. Process Safety Management, 3rd Ed. Ottawa, ON: Canadian Society for Chemical Engineering. EPA (U.S. Environmental Protection Agency). 2001. Hazardous Materials Emergency Planning Guide. NRT 1. National Response Team, U.S. Environmental Protection Agency. July 2001 [online]. Available: http://www.epa.gov/oem/docs/chem/cleanNRT10_12_distiller_complete. pdf. Accessed: Oct. 3, 2011. Hendershot, D. C. 2010. A summary of inherently safer technology. Process Saf. Prog. 28(4):389-392. Malloy, T. F. 2008. Of natmats, terrorism, and toxics: Regulatory adaptation in a changing world. UCLA J. Environ. Law & Policy. 26(1):97-127. OSHA (Occupational Safety and Administration). 1992. Process Safety Management 29 CFR 1910.119. Wilson, M. P., M. R. Schwarzman, T. F. Malloy, E. W. Fanning, and P. J. Sinsheimer. 2008. Green Chemistry: Cornerstone to a Sustainable California. University of California, Berkeley [on- line]. Available: http://coeh.berkeley.edu/greenchemistry/briefing/ or www.coeh.ucla.edu/green chemistry.htm. Zwetsloot, G., and N. Ashford. 2003. The feasibility of encouraging inherently safer production in industrial firms. Saf. Sci. 14(2/3):219-240 [online]. Available: http://dspace.mit.edu/bitstream/ handle/1721.1/1581/Feasibility.pdf?sequence=1.

The Use and Storage of Methyl Isocyanate (MIC) at Bayer CropScience Copyright National Academy of Sciences. All rights reserved.

The Use and Storage of Methyl Isocyanate (MIC) at Bayer CropScience Copyright National Academy of Sciences. All rights reserved. 8 Post-Incident Retrospective Process Assessment Part 3.5 of this study’s statement of task was to “[c]omment, if possible, on whether and how inherently safer process assessments can be utilized during post-incident investigations.” Unlike the preceding chapter, this portion of the task looks beyond Bayer and requires broad consideration of the application of inherently safer process (ISP) assessments under these circumstances. The conclusion from the analysis presented here is that the principles of ISP assess- ment can be used to good effect in conducting an incident investigation when the objective is the prevention of potential incidents having similar funda­ mental, underlying (root) causes. Examples are provided to demonstrate how this might be done and the extent of current practice in this regard. This chapter also provides information regarding emergency response systems and discusses how ISP assessments could be used to improve and support effective emergency planning and response. INCIDENT INVESTIGATION—AN ESSENTIAL COMPONENT OF A SAFETY MANAGEMENT SYSTEM As noted in Chapter 7, incident investigation is not a one-time, stand-alone event, but instead a necessary element within a functioning process safety man- agement (PSM) system. Indeed, it is one of the mandatory elements of OSHA’s PSM standard, which requires, “the investigation of each incident that resulted in, or could reasonably have resulted in, a catastrophic release of a highly hazardous chemical in the workplace” (Department of Labor, 2000). Comprehensive protocols and advice are available for conducting inves- tigations of chemical process incidents (e.g., CCPS, 2003). Such guidelines 141

The Use and Storage of Methyl Isocyanate (MIC) at Bayer CropScience Copyright National Academy of Sciences. All rights reserved. 142 USE AND STORAGE OF METHYL ISOCYANATE (MIC) AT BAYER CROPSCIENCE emphasize the need for a PSM system to be simultaneously retrospective and prospective, with incident investigation providing the vital bridge between the lessons of the past and safer designs and operation in the future (CCPS, 2003). This point is expanded upon in the following sections. Relationship Between A Priori and Post-Facto Assessment Although advance preparation is essential, incident investigations are con- ducted after the fact—that is, after a loss-producing event or a near-miss has occurred. In conducting a post-incident process assessment, it is important to avoid the problem of hindsight bias. Hindsight bias, known commonly as “­Monday morning quarterbacking” or “20-20 hindsight” is the tendency to view events as more foreseeable or more inevitable after the fact than they actually would have appeared at the time actions needed to be taken (Fischhoff, 1975; Blank et al., 2007; Louie et al., 2007). In particular, anyone who is judging the safety of a facility after an incident has information that was not available to those who conducted any pre-incident process assessment. Although most people recognize it would be unfair to use later information to second-guess earlier decisions, research on hindsight bias cited above has shown that cognitive biases can limit our ability to recognize the additional information that we have acquired after the event. While such new information should never be ignored, it is important to acknowledge that critical factors may not have been obvious before an incident, because this can help identify new opportunities for analysis, monitoring, communication, etc. The chain of events that produced a chemical release is obvious in retrospect because it happened, even though it might not have been obvious in prospect because safety analysts failed to imagine that such an event chain could happen. In such cases, it is important to judge what the safety analysts could reasonably have been expected to anticipate by examining the safety analyses conducted in other facilities. If facilities with similar designs had also failed to anticipate that chain of events, then those conducting a pos-tincident process assessment should be wary of the effects of hindsight bias. However, if facilities with similar designs had anticipated that chain of events, then those conducting a post-incident pro- cess assessment should be less concerned that their analyses are being affected by hindsight bias. Alternatively, it might be that the probability (rather than the possibility) of that chain of events might seem more likely in retrospect than in prospect because a pre-incident safety assessment underestimated the probability that such an event chain could happen. In this case, it is important to balance the possibil- ity that the post-incident process assessment is being affected by hindsight bias against the possibility that any pre-incident process assessment was affected by optimistic bias (Weinstein, 1989), also known as comparative optimism (Klar and Ayal, 2004). In other words, the pre-incident process assessment might have

The Use and Storage of Methyl Isocyanate (MIC) at Bayer CropScience Copyright National Academy of Sciences. All rights reserved. POST-INCIDENT RETROSPECTIVE PROCESS ASSESSMENT 143 assumed that engineered safety features would not fail, that emergency operating procedures would be implemented effectively, that everyone at risk would receive warning messages, and so on. Aside from any erroneous assumptions about the quality of the facility design, there is ample documentation that facilities “as built” and “as maintained” typically differ—sometimes substantially—from their original designs (as evidenced by the Bhopal tragedy). Further, operational and design changes over the life of a facility can introduce new hazards not anticipated by the original designers; this illustrates the need for an effective management-of-change protocol within an overall PSM system. Consequently, preincident process assessments can provide unrealistically optimistic estimates of incident probabilities. Issues of hindsight, and hindsight bias, are critical when the focus of an investigation is solely on a given incident itself, perhaps for reasons relating to litigation or disciplinary measures. It is precisely this retrospective nature of incident investigation, however, that gives this PSM element its dominant role in learning from experience. As noted in CCPS (2007), the process of incident investigation involves reporting, tracking, and investigating incidents, together with management of the development and documentation of recommendations arising from investigations. If the sole purpose is simply to establish guilt and assign blame to plant personnel, the result will not only be ineffective recommen- dations but also missed opportunities to prevent repeat occurrences. CCPS (2007) further comments that a much more effective approach to incident investigation is to develop recommendations that address systemic causes. In other words, it is the management system deficiencies (often termed root causes) that need to be identified in an effort to avoid not just the same or a similar incident from happening again, but also incidents that could occur because of the existence of deeper, management-system causation factors. Examples in this latter category would include shortcomings in any of the elements of a PSM system. Because PSM involves a suite of considerations that complement one another, efforts directed at a particular element can have a positive effect on one or more other elements. For example, commitment to a strong process safety culture will undoubtedly affect all remaining PSM elements as previously discussed in Chapter 7. It is difficult to envisage senior managers searching for PSM system deficiencies during an incident investigation without those same managers being fully committed to ensuring a sound safety culture; Sutton (2008) has demon- strated this strong correlation between root-cause analysis through incident inves- tigation and the development of a company’s safety culture. Similarly, hazard identification and risk analysis, which by their nature are a priori activities, can be used to inform the process of incident investigation, a post facto activity as previously mentioned. A tool commonly used to identify process hazards is a checklist of rel- evant concerns. Table 8.1 gives a partial listing of items drawn from the ISP checklist found in Appendix A of CCPS (2009). The recommended questions in

The Use and Storage of Methyl Isocyanate (MIC) at Bayer CropScience Copyright National Academy of Sciences. All rights reserved. 144 USE AND STORAGE OF METHYL ISOCYANATE (MIC) AT BAYER CROPSCIENCE TABLE 8.1  Partial ISP Checklist (adapted from CCPS, 2009) ISP Alternative a b c d e MINIMIZE Can hazardous raw materials inventory be reduced? Can hazardous in-process storage and inventory be reduced? Can hazardous finished product inventory be reduced? Can alternative equipment with reduced hazardous material inventory requirement be used? SUBSTITUTE Is this hazardous process/product necessary? Is it possible to completely eliminate hazardous raw materials, process intermediates, or by-products by using an alternative process or chemistry? Is an alternative process available for this product that eliminates or substantially reduces the need for hazardous raw materials or production of hazardous intermediates? Is it possible to substitute less hazardous raw materials? MODERATE Is it possible to limit the supply pressure of hazardous raw materials to less than the maximum allowable working pressure of the vessels to which they are delivered? Can the process be operated at less severe conditions for hazardous reactants or products by considering improved thermodynamics or kinetics to reduce operating temperatures or pressures? Can process units for hazardous materials be designed to limit the magnitude of process deviations? SIMPLIFY Can equipment be designed such that it is difficult or impossible to create a potential hazardous situation due to an operating or maintenance error? Can passive leak-limiting technology be used to limit potential loss of containment? Has attention to control system human factors been addressed through logical arrangement of controls and displays that match operator expectations? NOTES: a = Applicable (Y/N), b = Opportunities/Applications, c = Feasibility, d = Current Status, e = Recommendation. SOURCE: Adapted from CCPS (2009).

The Use and Storage of Methyl Isocyanate (MIC) at Bayer CropScience Copyright National Academy of Sciences. All rights reserved. POST-INCIDENT RETROSPECTIVE PROCESS ASSESSMENT 145 Table 8.1—which provide explicit, structured consideration of the four key ISP principles (minimization, substitution, moderation, and simplification)—can be asked at virtually any stage of process design and operation to identify potential hazards and suggest remedial actions. They can also be asked at the stage of inci- dent investigation with the aim of root-cause prevention. This point is elaborated upon in the following paragraph and later in this chapter. Kletz and Amyotte (2010) have commented that reports of incident investiga- tions often deal only with the immediate causes of the incident (i.e., the triggering events), but not with ways of avoiding the hazard. If an investigation protocol is designed primarily to determine why control of hazards was lost, it is unlikely that emphasis will be placed on examining why the hazard was tolerated and whether it could have been avoided in the first place. A primary function of effective inci- dent investigation must therefore be to challenge company personnel to question the basic technology underlying the affected materials, equipment, and processes. Several questions have been posed by Kletz and Amyotte (2010) to motivate incident investigators and investigation teams to think of less obvious ways of preventing process incidents. These questions, given below in adapted form, raise issues similar to the checklist questions listed in Table 8.1: • What is the purpose of the operation involved in the incident?

Why do we do this?

How else could we do it?

Who else could do it?

When else could we do it?

Where else could we do it?

What could we do instead? • What equipment failed?

How can we prevent failure or make it less likely?

How can we detect failure or approaching failure?

How can we control failure (i.e., minimize consequences)?

What does this equipment do?

What other equipment could we use instead?

What could we do instead? • What material leaked (exploded, decomposed, etc.)?

How can we prevent a leak (explosion, decomposition, etc.)?

How can we detect a leak or approaching leak (etc.)?

What does this material do?

What material could we use instead?

What safer form could we use the original material in?

What could we do instead? • Which people could have performed better? (Consider people who might supervise, train, inspect, check, or design better than they did, as well as people who might construct, operate, or maintain better than they did.)

The Use and Storage of Methyl Isocyanate (MIC) at Bayer CropScience Copyright National Academy of Sciences. All rights reserved. 146 USE AND STORAGE OF METHYL ISOCYANATE (MIC) AT BAYER CROPSCIENCE

What could they have done better?

How can we help them to perform better? (Consider training, instructions, inspections, audits, etc., as well as changes to design.)

What could we do instead? Kletz and Amyotte (2010) further challenge incident investigators to keep a more general, overarching set of questions in mind when following their estab- lished investigation protocol. These questions are as follows: • Did a lack of application of the principles of ISP play a role in incident causation? • Would minimization, substitution, moderation, and simplification have helped to prevent the incident or mitigate the consequences? • How effective were the available passive and active engineered safety devices with respect to prevention and mitigation? • How effective were the available procedural safety measures with respect to prevention and mitigation? • Were recommendations made to avoid the hazards and to permanently remove them wherever possible? AN APPROACH TO ISP-BASED INCIDENT INVESTIGATION The discussion in the preceding section demonstrated that similar questions can and should be asked during both hazard identification and incident investiga- tion. A structured use of checklist questions is, however, required for effective performance of the tasks of identifying hazards and investigating incidents. Hazard identification/risk analysis and incident investigation are distinct PSM elements. Because PSM is underpinned by the concept of continuous improvement, it stands to reason that the use of ISP principles in conducting these activities will lead to opportunities for refinement of the ISP assessment method- ologies. Mahnken (2001) has illustrated the general use of case histories arising from incident investigations to enhance process hazard analysis methodologies such as the familiar HAZOP (HAZard and OPerability study). Similarly, Khan (2006) has demonstrated how case histories can assist in identifying the need for improved hazard identification—particularly with respect to thermal stability of reactive materials and the potential for runaway chemical reactions. Khan (2006) further comments that “it is . . . necessary to make full use of all opportunities at the conceptual stages of process development and design to reduce the frequency of accidents in the chemical process industries.” This is essentially a call for early ISP consideration and an examination of the effectiveness of preincident ISP assessments based on the findings of post-incident investigations. Formalized approaches to ISP-based hazard identification are available in the process safety literature—for example, the protocol for use of ISP checklist

The Use and Storage of Methyl Isocyanate (MIC) at Bayer CropScience Copyright National Academy of Sciences. All rights reserved. POST-INCIDENT RETROSPECTIVE PROCESS ASSESSMENT 147 questions in conducting a process hazard analysis (PHA), which is described in Appendix B of CCPS (2009). In a similar vein, Goraya et al. (2004) have pro- posed the ISP-based protocol for incident investigation shown in Figure 8.1. Key features of this approach are as follows (Goraya et al., 2004): • Incorporation of a basic framework utilizing best practices drawn from industry; • Adoption of an integrated approach that considers all potential categories of loss (people, property, production, and environment; “property” meaning assets and “production” meaning uninterrupted business operation); • Classification of evidence collected after the incident into convenient data categories as appropriate with respect to data fragility (position, people, parts, and paper); • Use of a loss causation model for identification of factors which dis- tinguishes between “immediate causes, basic causes, and lack of management control factors” (i.e., management system deficiencies); • Introduction of inherent safety guidewords or “mind triggers”(minimize, substitute, moderate, and simplify) at both the initiation and completion of the protocol, in an attempt to encourage ISP considerations during the collection of data and the development of recommendations, respectively; • Use of explicit inherent safety checklist questions structured around key ISP principles (see, for example, Goraya et al., 2004; CCPS, 2009; Kletz and Amyotte, 2010) during root-cause analysis; and • Adoption of a layered approach for making recommendations. It is the last three items in the above list that make the protocol of Goraya et al. (2004) explicit in its consideration of ISP. The final item in particular, which was first introduced to the process safety community by Professor Trevor Kletz, is critical to the integration of ISP within the investigation protocol. As described previously in this chapter, it should be well-understood that the root causes of process incidents are typically management system deficiencies; this accounts for the third layer of recommendations shown in Figure 8.1. It is of course necessary to take immediate action to remove existing hazards following an incident; hence the first layer of recommendations in Figure 8.1. ISP, by its very nature, requires an attempt to avoid hazards and to permanently remove them wherever possible. It is therefore fundamentally impossible to address the second layer of recom- mendations in Figure 8.1 without explicit consideration of the principles of ISP. A positive result of second-layer ISP recommendations is thus the identification of opportunities for overall design improvements during facility rebuild in the case of significant asset loss. Such ISP opportunities represent a specific application of the well-established need to make general process improvements on the basis of both incident data (Leggett and Singh, 2000) and lessons learned from major incidents (Balasubramanian and Louvar, 2002).

The Use and Storage of Methyl Isocyanate (MIC) at Bayer CropScience Copyright National Academy of Sciences. All rights reserved. 148 USE AND STORAGE OF METHYL ISOCYANATE (MIC) AT BAYER CROPSCIENCE FIGURE 8.1  Inherent safety-based incident investigation methodology. SOURCE: Goraya et al. (2004).

The Use and Storage of Methyl Isocyanate (MIC) at Bayer CropScience Copyright National Academy of Sciences. All rights reserved. POST-INCIDENT RETROSPECTIVE PROCESS ASSESSMENT 149 However, the implementation of ISP improvements resulting from second- layer recommendations will not necessarily be seen as a practical approach by all decision makers. Sociologist Andrew Hopkins has addressed this issue in his recent book on high-reliability organizations (Hopkins, 2009). He comments that although a focus on incident investigation recommendations that are deemed practical to implement will at least increase the likelihood of action being taken, it will not ensure that more fundamental (and potentially more costly) system enhancements will be undertaken. Hopkins (2009) gives the example of additional training being provided to air traffic controllers who had made procedural errors, as opposed to removing hazards by making changes to the computer software running the air traffic con- trol consoles, which had been identified as the root-cause source of error. Such system-wide improvements to the underlying technology, although resource- intensive and requiring comprehensive risk assessment, remain the best response to hazards identified during an incident investigation (Hopkins, 2009). As discussed in Chapter 7, the principles of inherent safety have broad appli- cation to all elements of a PSM system. This point is repeated here as a reminder that ISP enhancements can be beneficial to all PSM aspects—not only those involving hazard identification, risk analysis, and incident investigation (Amyotte et al., 2007; CCPS, 2009; Kletz and Amyotte, 2010). LONG-TERM TRENDS IN INVESTIGATION RESULTS The documentation resulting from investigations by the U.S. Chemical Safety and Hazard Investigation Board (CSB) represents some of the most acces- sible process incident information available in the public domain. As noted on its Web site (www.csb.gov), CSB is an independent, nonregulatory federal agency charged with investigating industrial chemical incidents. Such incidents are inves- tigated by a team of CSB employees, and from the evidence collected, root and contributing causation factors are identified. With this information, the CSB creates sets of recommendations for various bodies such as facility managers, regulatory agencies, and technical associations. Following a completed investiga- tion, documentation in the form of a full investigation report, case study, safety bulletin, or urgent recommendations are made available on the CSB Web site. These documents often have accompanying video support and are widely recog- nized as valuable learning tools for improving safety in the process industries. An analysis of these publicly available CSB reports has recently been under- taken by Amyotte et al. (2011), primarily from the perspective of the actual and potential use of ISP principles in incident investigations. Approximately 60 reports covering the period 1998-2010 were reviewed; this resulted in the identifi- cation of numerous ISP examples related to incident prevention and consequence mitigation. These findings were often implicitly referenced in the documentation (i.e., not named as inherent safety per se), with a growing trend in recent years

The Use and Storage of Methyl Isocyanate (MIC) at Bayer CropScience Copyright National Academy of Sciences. All rights reserved. 150 USE AND STORAGE OF METHYL ISOCYANATE (MIC) AT BAYER CROPSCIENCE toward explicit use of ISP terminology when identifying causation factors and making recommendations. Particularly noteworthy in this latter regard are the BP Texas City (CSB, 2007), Valero McKee (CSB, 2008), and Xcel Energy (CSB, 2010a) investigation reports, as well as the urgent recommendations resulting from the Kleen Energy (CSB, 2010c) and ConAgra (CSB, 2010b) investigations. In accordance with the concept that ISP is not a stand-alone approach to risk reduction, the review of CSB reports by Amyotte et al. (2011) also identified a sig- nificant number of actual and potential measures related to the other categories in the overall hierarchy of controls. The majority of the non-ISP safety features were related to procedural safety, followed by active engineered devices and, to a lesser extent, passive engineered devices. These results were determined to be generally consistent with the work of Kidam et al. (2010), who reviewed 364 chemical pro- cess industry incident descriptions in the Failure Knowledge Database maintained on the Japan Science and Technology Web site. The analysis by Amyotte et al. (2011) identified investigation lessons similar to those given by Kaszniak (2010) in his independent review of CSB reports, and by Yang et al. (2009) in their analysis of case histories (including a small subset of CSB investigations). It is not known whether other organizations that conduct process incident investigations have adopted ISP as an integral component of their investiga- tion protocols. It does appear, however, that at least one such organization—the CSB—has made a conscious attempt to explicitly utilize the concept and prin- ciples of ISP during post-incident investigations. As noted by Amyotte et al. (2011), this is a welcome trend that should be encouraged and widely adopted in the process industries. Expanded use of ISP considerations during process inci- dent investigations is predicated on widespread knowledge and understanding of the inherent safety concept itself. Continued educational (e.g., Hendershot, 2006; Hendershot and Murphy, 2008) and training (e.g., IChemE, 2005) efforts in this regard are therefore imperative. CONCLUSIONS This chapter has provided a review of incident investigation from both a general perspective as a key element of a PSM system and with specific ISP considerations in mind. Incident investigations are most useful in the process industries when they are conducted with the objective of determining root causes. Such causes typically reside at the level of management system deficiencies and are often related to shortcomings in hazard identification and risk assessment protocols. Explicit incorporation of the principles of ISP can play an important role in the efficacy of an incident investigation protocol. Lessons learned from incident investigations—both general and those spe- cific to ISP—can also have a beneficial impact on PSM overall. Such lessons can be used to make systemic improvements involving all categories in the hierarchy of controls and to help identify previously unforeseen hazards in a given process

The Use and Storage of Methyl Isocyanate (MIC) at Bayer CropScience Copyright National Academy of Sciences. All rights reserved. POST-INCIDENT RETROSPECTIVE PROCESS ASSESSMENT 151 or industry sector. Because incident investigation acts within a management system based on continuous improvement, it is to be expected that investigation results will provide valuable input to the methodologies being used to predict hazards and prevent their occurrence. REFERENCES Amyotte, P. R., A. U. Goraya, D. C. Hendershot, and F. I. Khan. 2007. Incorporation of inherent safety principles in process safety management. Process Saf. Prog. 26(4):333-346. Amyotte, P. R., D. K. MacDonald, and F. I. Khan. 2011. An analysis of CSB investigation reports for inherent safety learnings. Paper No. 44a in Proceedings of 13th Process Plant Safety Sym- posium, 2011 Spring Meeting & 7th Global Congress on Process Safety, March 13-16, 2011, Chicago, IL. New York: American Institute of Chemical Engineers. Balasubramanian, S. G., and J. F. Louvar. 2002. Study of major accidents and lessons learned. Process Saf. Prog. 21(3):237-244. Blank, H., J. Musch, and R. F. Pohl. 2007. Hindsight bias: On being wise after the event. Soc. Cogni- tion 25(1):1-9. CCPS (Center for Chemical Process Safety). 1989. Guidelines for Technical Management of Chemical Process Safety. New York: American Institute of Chemical Engineers. CCPS. 2003. Guidelines for Investigating Chemical Process Incidents. 2nd Ed. New York: American Institute of Chemical Engineers. CCPS. 2007. Guidelines for Risk Based Process Safety. Hoboken, NJ: John Wiley & Sons. CCPS. 2009. Inherently Safer Chemical Processes: A Life Cycle Approach. 2nd Ed. Hoboken, NJ: John Wiley & Sons. CSB (Chemical Safety Board). 2007. Investigation Report: Refinery Explosion and Fire—BP, Texas City, TX. Report No. 2005-04-I-TX. Washington, DC: CSB [online]. Available: http://www.csb. gov/assets/document/CSBFinalReportBP.pdf. Accessed: Sept. 28, 2011. CSB. 2008. Investigation Report: LPG Fire at Valero-McKee Refinery—Valero Energy Corporation, Sunray, TX. Report No. 2007-05-I-TX. Washington, DC: CSB [online]. Available: http://www. csb.gov/assets/document/CSBFinalReportValeroSunray.pdf. Accessed: Sept. 28, 2011. CSB. 2010a. Investigation Report: Xcel Energy Hydroelectric Plant Penstock Fire—Cabin Creek, Georgetown, CO. Report No. 2008-01-I-CO. Washington, DC: CSB [online]. Available: http:// www.csb.gov/assets/document/Xcel_Energy_Report_Final.pdf. Accessed: Sept. 28, 2011. CSB. 2010b. Urgent Recommendations from ConAgra Investigation. Washington, DC: CSB [online]. Available: http://www.csb.gov/assets/document/CSB_Gas_Purging_Urgent_Recommendations. (2).pdf. Accessed Sept. 28, 2011. CSB. 2010c. Urgent Recommendations from Kleen Energy Investigation Washington, DC: CSB [online]. Available: http://www.csb.gov/assets/document/KleenUrgentRec.pdf. Accessed: Sept. 28, 2011. CSChE (Canadian Society for Chemical Engineering). 2002. Process Safety Management, 3rd Ed. Ottawa, ON: CSChE. Department of Labor. 2000. Process Safety Management. OSHA 3132. Washington, DC: OSHA Publications Office. Fischhoff, B. 1975. Hindsight ≠ foresight: The effect of outcome knowledge on judgment under uncertainty. J. Exp. Psychol. Human 1(3):288-299. Goraya, A., P. R. Amyotte, and F. I. Khan. 2004. An inherent safety-based incident investigation methodology. Process Saf. Prog. 23(3):197-205. Hendershot, D. C. 2006. Inherently Safer Design. SAChE (Safety and Chemical Engineering Educa- tion) [online]. Available: http://sache.org/index.asp. Accessed: Sept. 28, 2011.

The Use and Storage of Methyl Isocyanate (MIC) at Bayer CropScience Copyright National Academy of Sciences. All rights reserved. 152 USE AND STORAGE OF METHYL ISOCYANATE (MIC) AT BAYER CROPSCIENCE Hendershot, D. C., and J. Murphy. 2008. Inherently Safer Design Conflicts and Decisions. SAChE (Safety and Chemical Engineering Education) [online]. Available: http://sache.org/index.asp. Accessed Sept. 28, 2011. Hopkins, A, ed. 2009. Learning from High Reliability Organisations. Sydney, Australia: CCH Aus- tralia Limited. IChemE (Institution of Chemical Engineers). 2005. Inherently Safer Process Design, Training Re- source STP001. Rugby, UK: IChemE. Kaszniak, M. 2010. Oversights and omissions in process hazard analyses: Lessons learned from CSB investigations. Process Saf. Prog. 29(3):264–269. Khan, A. A. 2006. Case histories and recent developments to improve safety assessments during process development. Process Saf. Prog. 25(3):245-249. Khan, F. I., and P. R. Amyotte. 2003. How to make inherent safety practice a reality. Can. J. Chem. Eng. 81(1):2-16. Kidam, K., M. Hurme, and M. H. Hassim. 2010. Inherent safety based corrective actions in accident prevention. Pp. 447-450 in Proceedings of 13th International Symposium on Loss Prevention and Safety Promotion in the Process Industries, June 6-9, 2010, Bruges, Belgium, Vol. 2. Rugby, UK: Institution of Chemical Engineers. Klar, Y., and S. Ayal. 2004. Event frequency and comparative optimism: Another look at the indirect elicitation method of self-others risk. J. Exp. Soc. Psychol. 40(6):805-814. Kletz, T., and P. R. Amyotte. 2010. Process Plants: A Handbook for Inherently Safer Design. Boca Raton, FL: CRC Press. Leggett, D., and J. Singh. 2000. Process improvements from incident data. Process Saf. Prog. 19(1):13-18. Louie, T. A., M. N. Rajan, and R. E. Sibley. 2007. Tackling the Monday-morning quarterback: Ap- plications of hindsight bias in decision-making settings. Soc. Cognition 25(1):32-47. Mahnken, G. E. 2001. Use case histories to energize your HAZOP. Chem. Eng. Prog. 97(Mar.):73-78. OSHA (Occupational Safety and Health Administration). 2000. Process Safety Management. OSHA

  1. U.S. Department of Labor, Occupational Safety and Health Administration, Washington,

DC [online]. Available: http://www.osha.gov/Publications/osha3132.html. Accessed: Feb. 14, 2012. Sutton, I. S. 2008. Use root cause analysis to understand and improve process safety culture. Process Saf. Prog. 27(4):274-279. Weinstein, N.D. 1989. Optimistic biases about personal risks. Science 246(4935):1232-1233. Yang, X., L. Dinh, D. Castellanos, C. Osorio, D. Ng, and M.S. Mannan. 2009. Common lessons learned from an analysis of multiple case histories. Pp. 43-50 in Hazards XXI: Process Safety and Environmental Protection in Changing World, November 10-12, 2009, Manchester, UK. IChemE Symposium Series No. 155. Rugby, UK: Institution of Chemical Engineers.

The Use and Storage of Methyl Isocyanate (MIC) at Bayer CropScience Copyright National Academy of Sciences. All rights reserved. Appendixes

The Use and Storage of Methyl Isocyanate (MIC) at Bayer CropScience Copyright National Academy of Sciences. All rights reserved.

The Use and Storage of Methyl Isocyanate (MIC) at Bayer CropScience Copyright National Academy of Sciences. All rights reserved. Appendix A Statement of Task The National Research Council will produce a detailed written report, con- clusions, and recommendations where appropriate on the following subjects:

  1. Review the current industry practice for the use and storage of MIC in

manufacturing processes, including a summary of key lessons and con- clusions arising from the 1984 Bhopal accident and resulting changes adopted by industrial users of MIC.

  1. Review current and emerging technologies for producing carbamate

pesticides, including carbaryl, aldicarb, and related compounds.

The review should include:

  1. 1 Synthetic methods and patent literature
  1. 2 Manufacturing approaches used worldwide for these materials
  1. 3 Manufacturing costs for different synthetic routes
  1. 4 Environmental and energy costs and trade-offs for alternative

approaches

  1. 5 Any specific fixed-facility accident or transportation risks associated

with alternative approaches

  1. 6 Regulatory outlook for the pesticides including their expected life-

time on the market

  1. Examine the use and storage of MIC at the Bayer CropScience facility

in Institute, West Virginia:

  1. 1 Identify possible approaches for eliminating or reducing the use of

MIC in the Bayer carbamate pesticide manufacturing processes, through, for example, substitution of less hazardous intermediates, 155

The Use and Storage of Methyl Isocyanate (MIC) at Bayer CropScience Copyright National Academy of Sciences. All rights reserved. 156 USE AND STORAGE OF METHYL ISOCYANATE (MIC) AT BAYER CROPSCIENCE intensifying existing manufacturing processes, or consuming MIC simultaneously with its production.

  1. 2 Estimate the projected costs of alternative approaches identified

above.

  1. 3 Evaluate the projected benefits of alternative approaches identified

above, including any cost savings, reduced compliance costs, liabil- ity reductions, reduced emergency preparedness costs, and reduced likelihood or severity of a worst-case MIC release or other release affecting the surrounding community.

  1. 4 Compare this analysis to the inherently safer process assessments

conducted by Bayer and previous owners of the Institute site.

  1. 5 Comment, if possible, on whether and how inherently safer process

assessments can be utilized during post-accident investigations.

The Use and Storage of Methyl Isocyanate (MIC) at Bayer CropScience Copyright National Academy of Sciences. All rights reserved. Appendix B Carbamate Pesticide and Methyl Isocyanate Timeline 4 June 1954: Acrolein tank car explosion and 1955 ethylene oxide distillation column explosion at the Institute site led to the establishment of the Union ­Carbide Reactive Chemicals employee awareness training program and the Kanawha Valley Emergency Planning Committee. 1958: Carbaryl (Sevin) commercialized by Union Carbide (UCC); production by chloroformate process (phosgene + 1-naphthol → 1- naphthol chloroformate; naphthol chloroformate + methylamine → carbaryl) (None of the intermediates were made at Institute). 5 January 1961: First shipment of carbaryl from Institute. 1966: Methomyl introduced (and registered in 1968) by DuPont; production by isocyanate process (methomyl oxime + methyl isocyanate → methomyl). 1966: UCC startup of MIC Unit 1 for use in carbamate pesticides (other than carbaryl). 1976: UCC aldicarb (Temik) production started in Institute East Carbamoylation Center; production by isocyanate process (aldicarb oxime + methyl isocyanate → aldicarb). April 1978: UCC startup of new Syngas plant and MIC Unit 2 (Total Unit 1 and Unit 2 capacity: 42M lb/yr MIC). 157

The Use and Storage of Methyl Isocyanate (MIC) at Bayer CropScience Copyright National Academy of Sciences. All rights reserved. 158 USE AND STORAGE OF METHYL ISOCYANATE (MIC) AT BAYER CROPSCIENCE 1978: UCC carbaryl production changed to isocyanate process (phosgene + methylamine → methyl isocyanate; methyl isocyanate + naphthol → carbaryl) in Institute East Carbamoylation Center; isocyanate process claimed to involve higher overall yields, fewer losses from hydrochloride adduct by-products, less waste and environmental impact, and fewer and less severe corrosion problems. 1978: Sophisticated drum-filling operation enables MIC to be shipped to cus­ tomers in France, India, Brazil, and United States. Literature describes four general routes to carbaryl (http://www.exchemistry.com/ sevin.html):

  1. 1-naphthol + phosgene then + methylamine (chloroformate process),
  2. 1-naphthol + methyl isocyanate (isocyanate process),
  3. 1-naphthol + methyl carbamoyl chloride, and
  4. 1-naphthol + dimethyl urea.

In principle, these four approaches may also apply to any of the carbamates; as far as is known, however, only the chloroformate process was used as an alterna- tive to the isocyanate process, and that was for carbaryl, and that was abandoned. 1979: UCC shuts down MIC Unit 1 because of lower projected demand. 1984: UCC methomyl and Larvin production started using isocyanate process in Institute West Carbamoylation Center on old olefins site. 1984: Toluene diisocyanate site converted to Miscellaneous Carbamates Unit for aldicarb, Standak, Broot, and Zectran. 3 December 1984: Bhopal accident. 1985: MIC destruction capacity and other safety enhancements added at Institute. 23 April 1985: Boros (UCC) report on possible research alternatives:

  1. Aqueous medium for aldicarb oxime + MIC reaction (similar to DuPont

1970 patent).

  1. Onepot process for aldoxycarb (aldicarb oxime + methyl isocyanate

(water) → aldicarb; aldicarb + H2O2/HCOOH → aldoxycarb [Standik]).

  1. General process for carbamates: ROH + CO + CH3NH2 (Pd/O2) →

carbamate + H2O (caustic, chlorine, phosgene, MIC eliminated; need high Pd productivity and recovery) (based on Asahi Chemical article in Journal of Organic Chemistry, 1984).

The Use and Storage of Methyl Isocyanate (MIC) at Bayer CropScience Copyright National Academy of Sciences. All rights reserved. APPENDIX B 159

  1. Use of MIC/NaHSO3 solid adduct (reported 27 July 1976) instead of

MIC demonstrated for carbaryl, aldicarb, methomyl, and carbofuran.

  1. Conversion of methyl formamide to MIC over dehydrogenation catalyst

(Sun Ventures & DuPont, 1976).

  1. Review of 55 MIC patents between January 1944 and July 1979 reveal

primary method of MIC production to be phosgenation of methylamine followed by either (a) HCl removal by some separation technology, or (b) HCl removal by reaction with an acid receptor.

  1. NaOCN + dimethyl sulfate → MIC + sodium sulfate (cyanate process)

(Deutsche Gold patent; operated by Sunko, June 1980). June 1985: DuPont, given loss of availability of bulk MIC, develops methyl for- mamide oxidation process for MIC(g) production and integrates with continuous methomyl process for minimum MIC inventory. 11 August 1985: Accidental release of aldicarb oxime and methylene chloride in Miscellaneous Carbamates Unit (aldicarb plant) (Lead in part to new OSHA safety program for chemical plants and EPA Chemical Emergency Preparedness Program). January 1986: FMC, given the loss of availability of bulk MIC, starts production of carbofuran (Furadan) (operated by UCC on old ethyl alcohol site) in Institute West Carbamoylation Center; production by isocyanate process (carbofuran phe- nol + methyl isocyanate → carbofuran). 1986: UCC updates MIC patent review (July 1979-December 1985); patent activ- ity shifting to MIC “carriers”:

  1. Phosgenation of methylamine followed by pyrolysis of methyl car-

bamoyl chloride (traditional route; little patent activity);

  1. Phosgenation of ureas (Philagro);
  2. Thermal decomposition of carbamic acid esters (Bayer, EniChemica);
  3. Thermal decomposition of trisubstituted ureas (Bayer);
  4. Thermal decomposition of oxazolidinones (Agency of Industrial Science

and Technology);

  1. Thermal decomposition of oxalamate (BASF);
  2. Thermal decomposition of N-substituted acetylacetamides (Bayer);
  3. Thermal decomposition of dialkylmalonamides (Bayer);
  4. Thermal decomposition on N,N’-disubstituted allophanates (BASF);
  5. Thermal decomposition of organosilicon intermediates (Soviet publications);
  6. Thermal decomposition of reversible boron-MIC adducts (Vertac);
  7. Dehydrogenation of N-methylformamide (DuPont);
  8. Methylation of metal cyanate (Degussa, FMC);

The Use and Storage of Methyl Isocyanate (MIC) at Bayer CropScience Copyright National Academy of Sciences. All rights reserved. 160 USE AND STORAGE OF METHYL ISOCYANATE (MIC) AT BAYER CROPSCIENCE

  1. Acetyl chloride and sodium azide (USSR); and
  2. Amination of chloroformate (Hungary).

Recommended UCC research alkyl carbamates, boron compounds, and silyl carbamates. March 1986: UCC report on pyrolysis of aryl N-methyl carbamates to MIC. ~1986: UCC report on concept to react diphenyl carbonate and methylamine to make phenylmethylcarbamate based on EniChemica technology. October 1986: In a meeting with Nor-Am Chemical, UCC discloses that although it had been working on a phenyl methylcarbamate (and butylphenyl methylcar- bamate) process for shipment to make aldicarb at Woodbine, Georgia, Brazil, and France, it discovered that it could ship aldisol (aldicarb/methylene chloride solution) instead, and therefore was less interested in the phenyl methylcarbamate process. December 1986: Rhône-Poulenc (RP) buys Union Carbide Agricultural Products Division March 1987: Study by Schering Agrichemicals related to local Michigan pro- duction of carbamates given the loss of availability of bulk MIC (small scale: 1M lb/yr final product). Three basic approaches:

  1. Via MIC from onsite MIC generation,
  2. Via methyl carbamoyl chloride from methylamine phosgenation (with-

out pyrolysis), or

Via methyl carbamoyl chloride from methyl formamide and sulfuryl chloride. In turn, three cases were considered for onsite MIC generation:

  1. Sodium cyanate + dimethyl sulfate (Sunko);
  2. Methyl formamide oxidation (DuPont); and
  3. Diphenyl carbonate processes (two versions):

a) Diphenyl carbonate + methylamine (EniChemica and Union Carbide),

b) Diphenyl carbonate + dimethyl urea (Bayer). Concluded changing to EniChemica process had 5- to 6-year payback vs. contin- ued Sunko contract manufacture; recommended continue sulfuryl chloride route development.

The Use and Storage of Methyl Isocyanate (MIC) at Bayer CropScience Copyright National Academy of Sciences. All rights reserved. APPENDIX B 161 April 1988: RP evaluates DuPont methyl foramide oxidation route to MIC production. October 1988: RP Project MN:

  1. MIC vent gas incinerator,
  2. Carbaryl reliability and optimization,
  3. Comparison of UCC and RP syngas and phosgene technologies, and
  4. MIC downsizing (use of new discrete simulator software package).

31 January 1989: RP Project MS (presentation to Perez and Robirds) (preparation of MIC and aldicarb at Woodbine to eliminate aldisol transport from Institute to Woodbine). Two MIC processes considered:

  1. Cyanate process (NaOCN + dimethyl sulfate → MIC) (semibatch)

Pros: Low MIC inventory (200 lb or less); dimethyl sulfate to be made by RP

Cons: Dimethyl sulfate transportation; NaOCN availability; high vari- able costs; environmental protection concerns

  1. DuPont methyl formamide oxidation process (methyl formamide +

O2 → MIC + H2O)

Pros: DuPont technology; cost depends on methyl formamide cost, but lower than cyanate process

Cons: Need for pilot plant; Long development and startup time; lower MIC quality could risk lower aldicarb quality; needs “miracle” process and technology relationship with DuPont

Also considered transfer of Woodbine formulation capabilities to Institute (except gypsum granulation) and maintaining existing MIC and aldicarb technologies in Institute; this was the preferred alternative 1989: RP consideration of Enichem technology for phenyl methylcarbamate technology for individual MIC production at each carbamate process. July 1989: RP discussion of two alternative routes to diphenyl carbonate for Enichem process:

  1. Phenol phosgenation
  2. Phenol + CO + O2

December 1989: RP further discussions of Enichem MIC technology at Institute

  1. Manufacturing and inventory cost analysis,
  2. Concept and objectives,
  3. MIC generators/users interface,

The Use and Storage of Methyl Isocyanate (MIC) at Bayer CropScience Copyright National Academy of Sciences. All rights reserved. 162 USE AND STORAGE OF METHYL ISOCYANATE (MIC) AT BAYER CROPSCIENCE

  1. Quality program, and
  2. Impact on plant operaion.

Expected MIC inventories: 150 lb of methomyl, 300 lb of carbaryl, 50-300 lb of aldicarb. January 1990: RP considers MIC minimization (identified as “Bayer alterna- tive” based on diphenyl carbonate + dimethyl urea) as well as MIC containment alternatives. 10 July 1991: RP report on Enichem-RP technical meeting on dimethyl carbon- ate, diphenyl carbonate, and MIC

  1. Dimethylcarbonate is made from methanol, CO, and O2 over Cu and Pd;
  2. Diphenylcarbonate is either made from phenol and phosgene or phenol,

CO, and O2, or by transesterification of dimethylcarbonate with phenylacetate;

  1. Phenylmethylcarbamate is made from diphenylcarbonate and methyl-

amine to be cracked at each carbamate process to MIC. December 1991: RP designs (but does not build) a new MIC plant for Institute based on phenylmethylcarbonate production, storage, and distribution to various carbamate processes to be cracked to gaseous MIC. 18 August 1993: An explosion in the methomyl/Larvin plant killed one employee and critically injured two others. RP was charged with 27 safety violations including failure to properly maintain, inspect, and test piping systems and other equipment. OSHA fined RP a record $1.6 million. 1993: RP conducts $50M Institute Modification Project (IMP) related to MIC, phosgene, and chlorine safety. Aspects include chlorine unloading, chlorine trans- fer, phosgene production, elimination of hard-to-clean small diameter piping, MIC refining system and phosgene separation system leak detection, water leak detection by analysis for CO2, reduce number of make tanks, field storage tank modifications, MIC transfer line changes, methylamine storage relocation, local storage of caustic for MIC destruction, standby emergency diesel electric genera- tor; allow MIC production unit to operate at reduced rates (700-4000 lb/hr); new MIC instrumentation; replace Crane canned pumps with external recirculation with Sundyne canned pumps with internal recirculation; radiation shields for MIC and Cl2 transfer lines near fire hazards; control room air safety; replace Karbate reboilers with tantalum; MIC make analyzers; piperack crossing barriers; MIC capacity reduced to 22M lb/yr.

The Use and Storage of Methyl Isocyanate (MIC) at Bayer CropScience Copyright National Academy of Sciences. All rights reserved. APPENDIX B 163 1994: RP MIC Risk Management Plan. Process design

  1. Emergency dump tank available for safe transfer of product from leaking

vessel,

  1. Scrubber will destroy MIC from any storage tank,
  2. Flare tower will destroy MIC vapors from process vents,
  3. Backup control room instruments,
  4. Automatic MIC isolation valves stop leaks,
  5. Diking and spill collection sump,
  6. Fire deluge system,
  7. MIC leak detection alarms,
  8. Safety relief valves protect vessels from over pressure,
  9. Diesel generator for backup power,
  10. Sealless pumps for pure liquid MIC,
  11. Fire protection for pipe rack transfer lines, and
  12. Independent nitrogen supply to prevent cross contamination.

Equipment design

  1. Double-walled underground storage tank,
  2. Pressure vessels coded by ASME,
  3. Blastmat protection on aboveground MIC storage facilities,
  4. Stainless steel construction,
  5. Pipelines over roads protected by barriers, and
  6. Double-walled pipelines with leak detection analyzers on critical trans-

fer lines. Safety reviews

  1. Process hazard analysis completed every five years,
  2. Ongoing safety reviews for design changes,
  3. Operational reviews completed for all process changes, and
  4. Safety review team includes safety experts, engineers, union operators,

and union maintenance personnel. Procedures

  1. Strictly enforced inventory limits,
  2. Annual review of operating procedures,
  3. Personnel safety procedures, and
  4. Strictly enforced cross-plant transfer procedure.

Training

  1. Skilled union operators are trained and qualified,
  2. Maintenance personnel are fully trained, and

The Use and Storage of Methyl Isocyanate (MIC) at Bayer CropScience Copyright National Academy of Sciences. All rights reserved. 164 USE AND STORAGE OF METHYL ISOCYANATE (MIC) AT BAYER CROPSCIENCE

  1. Hazard communications training provided for all personnel, including

contractors. Mechanical Integrity

  1. Periodic testing and inspections for tanks, columns, heat exchangers,

pumps, instruments, pipes. Emergency Response

  1. Dedicated in-plant Emergency Operations Center,
  2. Trained Incident Commander onsite,
  3. Trained emergency squad onsite at all times,
  4. Plant-wide notification system,
  5. Dispersion modeling system,
  6. Regular meetings and coordination with community responders,
  7. Onsite dispensary and doctor,
  8. Periodic unannounced drills,
  9. Courtesy notification to METRO of minor releases, and
  10. Plant can activate community alarm (Good Samaritan Agreement).

Incident Investigation

  1. Formal investigations conducted for significant events,
  2. Reporting procedures for all events, and
  3. Conducted with operators, union, and safety representatives.

Audits

  1. In-plant audits,
  2. Corporate audits,
  3. Job observation,
  4. Auditing for critical safety procedures, performed by each department,
  5. CMA Responsible Care self-audits conducted annually, and
  6. Ongoing risk assessment process.

12 August 1996: AgrEvo evaluation of Kuo-Ching (Taiwan) MIC production MIC made batchwise by cyanate process (NaOCN + dimethyl sulfate); two batch lines; 1000kg/batch; no overnight storage. Has/Does: Scrubbers, dump tanks, backup control room instruments, auto- matic MIC isolation valves, diking, fire deluge system, pressure relief valves, backup diesel power, gravity flow for MIC, mechanical seals on agitators, fire protection for transfer lines, periodic process hazard analysis, safety reviews for design and equipment changes, operational reviews for process changes, safety review team expertise, inventory limits, annual review of procedures, personnel safety procedures, enforced plant procedures, trained and qualified operators, trained maintenance, hazard communications, testing and inspection for leaks,

The Use and Storage of Methyl Isocyanate (MIC) at Bayer CropScience Copyright National Academy of Sciences. All rights reserved. APPENDIX B 165 trained emergency squad, emergency notification system, coordination with com- munity emergency responders, unannounced drills, community alarm, formal incident investigation, reporting procedure, investigations conducted with opera- tors and safety representatives. Does Not Have/Do: Heat transfer fluid inert to MIC, MIC leak detection alarms, double-walled storage tanks, blastmat protection on aboveground storage tanks, double-walled pipelines, dedicated in-plant emergency operation center, onsite trained incident commander, onsite dispensary and doctor. AgrEvo expressed unspecified concerns over conditions of the MIC unit and a renovation was promised. March 1999: RP purchases FMC carbofuran and carbosulfan manufacturing facilities and establishes Carbamate Excellence Center. November 1999: RP begins production of new carbamate Oxamyl in Miscel- laneous Carbamates Unit. December 1999: Rhône-Poulenc agricultural products division merged with Hoechst Shering AgrEvo to form Aventis CropScience. October 2001: Aventis CropScience sold to Bayer to become Bayer CropScience. October 2002: Bayer conducts safety analyses of MIC and carbamate operations. 2002: Bayer MIC Inventory Reduction Conclusions.

  1. Increased unavailability of MIC could lead to operational delays in con-

suming units;

  1. Limiting maximum MIC capacity would lead to increased shut down start

up cycles for MIC unit;

  1. Points 1 and 2 are inversely proportional; and
  2. Forcing MIC inventory levels down appears feasible, but costly for MIC

manufacture and downstream consumers. 28 August 2008: Bayer methomyl residue treater accident. May 2009: Carbofuran banned by the U.S. Environmental Protection Agency. 2009: Bayer MIC production 9M lb. 5 April 2009: House Energy and Commerce Committee asks U.S. Chemical Safety and Hazard Investigation Board to investigate alternative MIC technologies.

The Use and Storage of Methyl Isocyanate (MIC) at Bayer CropScience Copyright National Academy of Sciences. All rights reserved. 166 USE AND STORAGE OF METHYL ISOCYANATE (MIC) AT BAYER CROPSCIENCE 26 August 2009: Bayer announces $25 M plant modification. Modification plan includes the following (Martin, 2011). Bayer MIC Unit Layers of Protection Primary measures:

  1. Process design.
  2. Equipment, piping, and instrumentation standards:

a. Exotic materials of construction throughout the process to minimize corrosion.

  1. Operator training and experience, mature, well-documented procedures.
  2. Online analysis allows verification of MIC quality before adding to stor-

age tank:

a. MIC purity must be maintained to minimize the probability and rate of undesirable reactions;

b. Multiple analyzers based on diverse technologies used to monitor MIC quality both before and after entering storage tanks; and

c. Proper levels of adverse reaction inhibitors are maintained in under- ground storage.

  1. MIC storage tanks are located underground:

a. Tank integrity is protected by jacket and vault.

  1. MIC tanks are maintained at low temperatures, minimum needed pres-

sure, and are instrumented with redundant pressure, level, temperature, and temperature rate of rise alarms:

a. Temperature rise is an indication of loss of refrigeration and/or reaction;

b. Higher temperature increases the rate of reaction for undesirable reactions; and

c. Pressure indicates venting due to contaminated MIC and/or loss of refrigeration.

  1. Buffered cooling with non-reactive solvent for all MIC storage:

a. Prevents contamination with reactive coolant.

  1. Canned rotor pumps are used for refined MIC service:

a. Prevents seal leakage to the environment even at trace levels.

  1. Dedicated nitrogen supply for MIC services which can also provide a

backup for instrument air.

  1. Distillation condensers are placed high in the structure to avoid reflux

pumps.

  1. Structured process hazards analysis by HAZOP method.
  2. The refined MIC has online analysis for water and major impurities:

a. Provides early detection of water contamination in the event of a leak in the condenser or vent condenser.

b. Both make stream and storage tanks in building are covered.

The Use and Storage of Methyl Isocyanate (MIC) at Bayer CropScience Copyright National Academy of Sciences. All rights reserved. APPENDIX B 167

  1. Continually charged MIC transfer lines outside MIC unit process struc-

ture are double-walled:

a. Adds additional structural integrity to the transfer lines,

b. Prevents small leakage from welds and flanges or from corrosion,

c. Annulus is nitrogen swept and the sweep gas analyzed for organics for early detection, and

d. Steam/ammonia curtain around MIC process structure to mitigate any leaks within structure.

  1. Transfer from MIC underground tank to carbaryl unit is done continu-

ously using double walled pipe. The MIC goes directly into the reaction loop around the continuous carbamoylation reactor. There is no MIC storage in the carbaryl unit.

  1. Transfer from MIC underground tank to the aldicarb unit is also done

continuously using double-walled pipe.The MIC goes directly into the batch aldicarb reactor and there is no MIC storage in the unit. Secondary measures:

  1. Emergency vents to scrubber then to flare:

a. MIC-bearing emergency vents have two buffers before the environment.

  1. Sufficient caustic to destroy all stored MIC in the unit:

a. Emergency equipment operates even in loss of site power and utilities.

  1. Diesel generator provides backup power for controls and pumps needed

to destroy MIC:

a. Allows operation of all equipment necessary to destroy MIC, even in the event of a complete electrical power outage, utility outage; and

b. Sphere nitrogen can quickly be set to supply unit instrument air header.

  1. Ambient air monitors are provided to detect MIC/phosgene release:

a. Provides an early warning of fast-developing releases;

b. Includes sweeps on double-walled equipment and piping; and

c. Covers process structure and storage building.

  1. An emergency dump tank as large as the single largest MIC tank is

provided:

a. Provides an additional storage location in case of an emergency around the MIC storage tanks; and

b. The tank is always empty, with a nitrogen blanket, is double-walled construction, and is underground. Bayer Phosgene Handling Considerations

  1. Phosgene product is condensed using chilled solvent.

The Use and Storage of Methyl Isocyanate (MIC) at Bayer CropScience Copyright National Academy of Sciences. All rights reserved. 168 USE AND STORAGE OF METHYL ISOCYANATE (MIC) AT BAYER CROPSCIENCE

  1. Small condenser accumulator is in place to provide a buffer to prevent

CO reaching the MIC process.

  1. All liquid phosgene vessels and piping are double walled.
  2. Phosgene product is transferred to the MIC unit phosgene vaporizer by

pressure to avoid pumps. 2010: Bayer planned MIC production: 11.5M lbs 2010: In response to House Energy and Commerce Committee request to investigate alternative MIC technologies, Bayer evaluated five most promising alternatives:

  1. Current Bayer (UCC) process MIC(l): (phosgene + methylamine)
  2. Diphenylcarbonate process MIC(g): (diphenyl carbonate + dimethyl urea

based on Bayer 1971-2002 Dormagen operating data)

  1. Enichem process MIC(g): (diphenylcarbonate + methylamine based on

RP 1989-1990 evaluation)

  1. Cyanate process MIC(g): (NaOCN + dimethyl sulfate based on Russian/

Japanese 1973-1985 patent literature)

  1. DuPont process MIC(g): (methyl foramide oxidation based on SRI and

RP evaluation). The carbaryl process needed to be modified to handle gaseous MIC in the last four alternatives. Evaluation Summary Diphenylcarbonate (Bayer) Pros • Investment smaller than Enichem process, • Good chemical stability of diphenylcarbonate, • Residue amount smaller than Enichem process, and • Lower storage requirements than Enichem process. Cons • Rely on competition for supply of raw material (dimethylurea from BASF); • Handling of other toxic materials (e.g., phenol); • Impact of MIC quality on product quality and hence registration likely (new registration, if at all, requires 2-3 years); in addition, impact on ­aldicarb formulation highly likely because of its complexity and ­sensitivity to low level of impurities; • Impact on manufacturing technologies for aldicarb and carbaryl; signifi- cant amount of process development required for adaptation (2-3 years); • Large amount of equipment required; • Diphenylcarbonate plants have been shut down more than 10 years; no in- house know-how available any longer; learning curve expected to be steep.

The Use and Storage of Methyl Isocyanate (MIC) at Bayer CropScience Copyright National Academy of Sciences. All rights reserved. APPENDIX B 169 Enichem Pros • No need for chlorine and phosgene, and • Reduction of MIC inventory. Cons • Impact of MIC quality on product quality and hence registration likely (new registration, if at all, requires 2-3 years); in addition, impact on ­aldicarb formulation highly likely because of its complexity and ­sensitivity to low level of impurities; • Impact on manufacturing technologies for aldicarb and carbaryl: signifi- cant amount of process development required for adaptation (2-3 years); • Utilization of recycle phenol (no experience of Enichem technology at large scale available); • Effluents quantities and qualities (residual phenol); and • Learning curve to be absorbed. Cyanate Pros • Currently used by most of the Asian suppliers at small scale, it has the advantage to produce MIC on demand: one batch of MIC for one ­carbamoylation batch. Cons • Includes handling of other toxic materials (e.g, DMS); • Produces large amount of waste (6 kg per kg MIC); • For large quantities such as 4,000 Mt/year and the need to feed large continuous units like carbaryl or methomyl, high level of MIC inventory is required; • MIC can only be produced in batch, requiring a large number of large- batch reactors; technology involves more equipment than currently at Institute, increasing safety risk; • Impact of MIC quality on product quality and hence registration likely (new registration, if at all, requires 2-3 years); in addition, impact on ­aldicarb formulation highly likely because of its complexity and s­ensitivity to low level of impurities; • Impact on manufacturing technologies for aldicarb and carbaryl: signifi- cant amount of process development required for adaptation (2-3 years); and • Learning curve will be steep. DuPont Pros • DuPont Technology produces MIC from air oxidation of methylfor- mamide; MIC is available diluted in N2 streams.

The Use and Storage of Methyl Isocyanate (MIC) at Bayer CropScience Copyright National Academy of Sciences. All rights reserved. 170 USE AND STORAGE OF METHYL ISOCYANATE (MIC) AT BAYER CROPSCIENCE Cons • MIC quality is different, impacting product quality and hence registration (new registration, if at all, requires 2-3 years); in addition, impact on aldi- carb formulation highly likely because of its complexity and sensitivity to low level of impurities; • Impact on manufacturing technologies for aldicarb and carbaryl: signifi- cant amount of process development required for adaptation (2-3 years); • Because of a mix of batch and continuous process, MIC inventory needed; • Process streams may contain traces of toxic materials (e.g., HCN); and • Supply of raw material (methylformamide) in the hands of competitors (BASF and DuPont). Conclusions Only DuPont process shows competitive manufacturing cost, but: • Unknown impact of by-products on product quality and registration; • Unknown impact of wastes on Institute waste handling facilities; and • Low catalyst lifetime (frequent shutdowns). Recommendation

Continue with the existing MIC technology at Institute but reduce manu- facturing to two products (aldicarb and carbaryl) allowing downsizing of the MIC plant and reduction of MIC inventory by 80 percent. 2010: Bayer $25M Project MINEXT to reduce inventory by MIC 80 percent

  1. Passive and active safety systems:

a. Underground storage, double-walled construction; SS inner shell;

b. Refrigerated MIC storage;

c. Adjacent empty dump tanks;

d. Scrubbers and flare system independently capable of destroying MIC in process and storage;

e. Double-walled piping with annular nitrogen purge;

f. Air monitoring;

g. Automated control system; automated safety supervisory system, trained operators, and technical professionals; and

h. Steam-ammonia curtain to mitigate phosgene or MIC leaks;

i. Leak detection and repair process for extremely small leaks. 11 January 2011: Bayer announces plans to restart the East Carbamoylation Center and the new reduced MIC inventory system for aldicarb and carbaryl production, but for a period of no more than 2 years.

The Use and Storage of Methyl Isocyanate (MIC) at Bayer CropScience Copyright National Academy of Sciences. All rights reserved. APPENDIX B 171 18 March 2011: As a result of legal challenges and delays that meant missing the production window to meet demand for the 2011 growing season, Bayer announces decision not to restart aldicarb, carbaryl, or MIC production facilities and to permanently shut down the East Carbamoylation Center, ending all MIC and carbamate pesticide production at Institute.

The Use and Storage of Methyl Isocyanate (MIC) at Bayer CropScience Copyright National Academy of Sciences. All rights reserved.

The Use and Storage of Methyl Isocyanate (MIC) at Bayer CropScience Copyright National Academy of Sciences. All rights reserved. Appendix C Emergency Response and Emergency Preparedness Emergency response is commonly conceived as providing an additional layer of protection that goes beyond engineered safety features (ESFs) such as water curtains and flare systems (CCPS, 2009). That is, the emergency response is intended to be independent of all ESFs so that it can perform even if those systems fail. Indeed, an effective emergency response involves linked onsite and offsite emergency response organizations that perform emergency assessment, hazard operations, population protection, and incident management actions. On the basis of federal guidance for nuclear and chemical emergency preparedness (USNRC/FEMA, 1980; NRT, 1987, 1988), Lindell and Perry (1992, 2006, 2007) defined emergency assessment as actions taken to define the nature and magnitude of an event by evaluating conditions in the facility and the surrounding physical environment—especially plant conditions, chemical releases, and meteorological conditions (McKenna, 2000). Hazard operations consist of preventive and correc- tive actions to control leaks, spills, fires, and stabilize containers (Lesak, 1999). Population protection includes the use of personal protective equipment and safe havens to protect facility personnel. In addition, it includes offsite actions such as warning people in potentially affected areas to shelter in-place or evacuate, providing evacuation transportation support and traffic management, establish- ing public shelters (congregate care facilities for those who lack the funds to pay for hotels/motels or nearby, and providing medical treatment for those who are injured (Perry and Lindell, 2007). Finally, incident management ensures that emergency assessment, hazard operations, and population protection actions are undertaken in a timely and effective manner and that responders have sufficient resources—including support staff, equipment, and facilities—to do their jobs. Effective incident management provides coordination between onsite and offsite 173

The Use and Storage of Methyl Isocyanate (MIC) at Bayer CropScience Copyright National Academy of Sciences. All rights reserved. 174 USE AND STORAGE OF METHYL ISOCYANATE (MIC) AT BAYER CROPSCIENCE emergency response organizations through a mutually agreed emergency clas- sification system and standardized forms for continuing emergency assessments. In addition, coordination between onsite and offsite organizations is facilitated by mutual adoption of organizational structures such as the Incident Command System (DHS, 2008). People sometimes erroneously assume that major disasters are just larger versions of routine emergencies, and so available personnel can improvise a satisfactory response using available resources. In fact, major disasters involve both quantitatively larger and qualitatively different demands that arise from tasks that are not performed, and resources that are not available, during routine operations. Thus, emergency planners need to follow a systematic process that develops accurate assessments of incident demands and community capabilities, identifies the gaps between demands and capabilities, and develops a strategic plan for reducing this gap (Lindell and Perry, 2007). Specifically, they must use hazard/vulnerability analysis to identify, in advance, what are the abnormal inci- dent demands that should be expected and what are the novel emergency response functions that will need to be performed in response to these demands. In addi- tion, they need to identify the organizations that will perform these emergency response functions and the resources those organizations will need in order to perform their emergency response functions. Emergency operations plans and procedures can be developed by following guidance from the federal government (NRT, 1987, 1988; FEMA, 2010) and chemical industry (CMA, 1985), national standards (NFPA, 2010), and accredi- tation programs (EMAP, 2010). These documents are sometimes misinterpreted to suggest that the development of paper plans and procedures is a sufficient condition for adequate emergency preparedness. Instead, development of written plans and procedures should be considered to be a necessary, but not a suffi- cient, condition. At minimum, plans and procedures need to be supplemented by periodic audits to ensure that they are current (e.g., telephone numbers are up to date) and that equipment is properly maintained (e.g., portable instruments are charged and calibrated). In addition to developing emergency operations plans and procedures, emer- gency planners need to conduct training needs assessments to identify any tasks that are critical, infrequent, and difficult (Goldstein and Ford, 2002). Critical tasks are those that are essential to protecting the health and safety of facility personnel, offsite responders, and the offsite population. In addition, although some emergency response tasks are the same as ones performed during normal operations, it is important to identify which of them are performed infrequently and therefore provide few opportunities for emergency responders to practice and develop skilled performance. Finally, some tasks might be difficult to perform because of their cognitive, psychomotor, or physical demands. Effective emer- gency preparedness requires identifying these infrequent, critical, and difficult tasks, selecting the appropriate personnel for each position in the emergency

The Use and Storage of Methyl Isocyanate (MIC) at Bayer CropScience Copyright National Academy of Sciences. All rights reserved. APPENDIX C 175 response organization, and providing the levels of initial and refresher training needed to ensure emergency responders continuing proficiency. Like safety train- ing, emergency response training can be accomplished in a number of different ways that address workers’ abilities and performance motivation (Lindell, 1994). Because of the significant uncertainties about disaster demands, emergency plan- ners need to provide training that facilitates emergency responders’ ability to improvise so that they can develop incident action plans that adapt to the distinc- tive circumstances of each emergency (Ford and Schmidt, 2000; Mendonça and Wallace, 2004). Finally, effective emergency preparedness programs rely on methods such as drills, exercises, and minor incidents. Individual responder drills—as well as tabletop, functional, and full-scale exercises—need to be reviewed by qualified evaluators. Critiques of these drills and exercises can be used not only to identify needs for additional individual training but also can be used as opportunities for organizational learning. That is, these critiques can be used as the basis for revis- ing plans, procedures, and selection and training programs. DEVELOPING AND MAINTAINING EMERGENCY PREPAREDNESS To identify organizational and contextual factors associated with establishing and maintaining emergency preparedness, we conducted a search for articles on emergency preparedness at chemical facilities. This search yielded a number of scholarly articles on emergency preparedness but most of them provide recom- mendations for developing facility emergency preparedness rather than examining factors that influence its development and maintenance. Of the few articles that discuss changes in facility emergency preparedness, most examine the effects that major incidents such as Bhopal exert on subsequent laws and regulations with which chemical facilities must then comply (e.g., Belke and Dietrich, 2005; Joseph et al., 2005; Gerbec and Kontic, 2009). Only two studies have examined factors influencing emergency preparedness at chemical facilities. Quarantelli et al. (1979) found that larger companies had more extensive planning processes than smaller ones, and Lindell and Perry’s (1998) examination of hazardous materi- als—handling firms in Los Angeles, California, found that all facilities in the study were more likely to engage in hazard assessment and emergency preparedness measures than hazard mitigation measures in the year after the 1994 Northridge Earthquake. Moreover, they substantially increased their implementation of hazard mitigation measures such as plant site, plant design, process modification, exter- nal hazard protection, chemical substitution, and administrative controls during that time period. Surprisingly, however, there was no evidence of a relationship between experienced damage and implementation of these mitigation measures. A broader literature on organizational emergency preparedness reveals that businesses generally engage in limited levels of emergency preparedness (Mileti et al., 1993; Drabek, 1994a; Dahlhamer and D’Sousa, 1997). As was the case

The Use and Storage of Methyl Isocyanate (MIC) at Bayer CropScience Copyright National Academy of Sciences. All rights reserved. 176 USE AND STORAGE OF METHYL ISOCYANATE (MIC) AT BAYER CROPSCIENCE in the Quarantelli et al. (1979) study, the most reliable indicator for predicting organizational emergency preparedness is organizational size (Drabek, 1991, 1994a,b; Dahlhamer and D’Souza, 1997; Perry and Lindell, 2007). In addition, some ­studies have found evidence of a positive relationship between disas- ter experience and business emergency preparedness (Dahlhamer and Reshaur, 1996; Dahlhamer and D’Souza, 1997; Webb et al., 2000). Finally, some studies on organizational emergency preparedness have found that other characteristics, including business age, scope (local vs. national) and type may correlate with degree of emergency preparedness, but at this time, the findings are inconsistent across studies. There has been a substantially smaller amount of research on the conditions that facilitate community emergency preparedness (Lindell and Perry, 2001, 2007). An analogue of management support, support from senior elected and appointed officials, as well as the wider community, is an important element in community emergency preparedness but other elements are also important (­Lindell and Perry, 2006, 2007). These include hazard exposure/vulnerability, community resources, extra-community resources, routine staffing/organization, and the type of planning process adopted. In addition, EPA performed a sys- tematic study of community preparedness for chemical accidents and found that there was often poor coordination between plants and communities as well as few communication protocols in place for emergency response (Rogers and Sorensen, 1991; Sorensen and Rogers, 1988­). All of these factors directly or indirectly affect individual outcomes for those participating in the community emergency preparedness system (job satisfaction, organizational commitment, organizational attachment, and organizational citizenship), as well as organizational outcomes such as the quality, timeliness, and cost of products such as hazard/vulnerability analyses, community capability assessments, emergency plans and procedures, training programs, and risk communication programs. SUMMARY Effective emergency response requires pre-incident emergency preparedness to ensure that onsite and offsite emergency response organizations have adequate staffing, training, and resources. There is extensive guidance available for devel- oping and maintaining emergency preparedness, but the level of organizational emergency preparedness is generally modest. It appears that a major impediment is that many organizations underestimate the demands of a major incident, or overestimate their ability to improvise an effective response, or both. Additional impediments to the development of effective emergency preparedness programs are perceptions that emergency preparedness is “an intractable problem and that disaster reduction policies lack clear and measurable performance objectives” (Waugh, 1988). These problems are exacerbated by the disparity between the costs and benefits of effective emergency preparedness programs; such programs

The Use and Storage of Methyl Isocyanate (MIC) at Bayer CropScience Copyright National Academy of Sciences. All rights reserved. APPENDIX C 177 have substantial short-term costs but only “pay off” in the long term. The limited amount of existing research suggests that organizational emergency preparedness is usually determined by factors such as organizational size and disaster experi- ence, but other factors also need to be examined (Lindell and Perry, 2007). ISP strategies can avoid some of the shortcomings of organizational emer- gency preparedness programs by reducing the toxicity of the chemicals being used or produced, the quantity of the chemicals being stored, and the conditions under which they are being stored. However, chemical facility designers need to consider the potential for ISD strategies to transfer risks from communities surrounding fixed-site facilities to those on transportation routes where the lower quantities released are likely to be at least partially offset by lower levels of emergency preparedness. REFERENCES Belke, J. C., and D. Y. Dietrich. 2005. The post-Bhopal and post-9/11 transformations in chemical emergency prevention and response policy in the United States. J. Loss Prevent. Proc. Ind. 18:375-379. CCPS (Center for Chemical Process Safety). 2009. Inherently Safer Chemical Processes: A Life Cycle Approach, 2nd ed. Hoboken NJ: John Wiley & Sons. CMA (Chemical Manufacturers Association). 1985. Community Awareness and Emergency Response: Program Handbook. Washington, DC: CMA. Dahlhamer, J. M., and M. J. D’Sousa. 1997. Determinants of business-disaster preparedness in two U.S. metropolitan areas. Int. J. Mass Emerg. Disasters 15:265-281. Dahlhamer, J. M., and L. M. Reshaur. 1996. Businesses and the 1994 Northridge Earthquake: An Analysis of Pre- and Post-disaster Preparedness. Newark, DE: University of Delaware Disaster Research Center. DHS (U.S. Department of Homeland Security). 2008. National Incident Management System. Wash- ington, DC: DHS. Drabek, T. E. 1991. Anticipating organizational evacuations: Disaster planning by managers of tourist- oriented private firms. Int. J. Mass Emerg. Disasters 9:219-245. Drabek, T. E. 1994a. Disaster Evacuation and the Tourist Industry. Boulder, CO: University of Colo- rado Institute of Behavioral Science. Drabek, T. E. 1994b. Risk perceptions of tourist business managers. Environ. Prof. 16:327-341. EMAP (Emergency Management Accreditation Program). 2010. EMAP Standard. Lexington, KY: EMAP. FEMA (Federal Emergency Management Agency). 2010. Developing and Maintaining Emergency Operations Plans, Comprehensive Preparedness Guide (CPG) 101, Ver. 2.0. Washington, DC: FEMA. Ford, J. K., and A. Schmidt. 2000. Emergency preparedness training: Strategies for enhancing real- world performance. J. Hazard. Mater. 75:195-215. Gerbec, M., and B. Kontic. 2009. Implementation of the Seveso II Directive in Slovenia: Survey of implementation and opinions of operators regarding its safety benefits. Saf. Sci. 47:561-568. Goldstein, I. L., and J. K. Ford. 2002. Training in Organizations: Needs Assessment, Development and Evaluation, 4th Ed. Pacific Grove, CA: Brooks/Cole. Joseph, G., M. Kaszniak, and L. Long. 2005. Lessons after Bhopal: CSB a catalyst for change. J. Loss Prevent. Proc. Ind. 18:537-548.

The Use and Storage of Methyl Isocyanate (MIC) at Bayer CropScience Copyright National Academy of Sciences. All rights reserved. 178 USE AND STORAGE OF METHYL ISOCYANATE (MIC) AT BAYER CROPSCIENCE Lesak, D. M. 1999. Hazardous Materials: Strategies and Tactics. Upper Saddle River, NJ: Prentice-Hall. Lindell, M. K. 1994. Motivational and organizational factors affecting implementation of worker safety training. Pp. 211-240 in Occupational Medicine State of the Art Reviews: Occupational Safety and Health Training, M. J. Colligan, ed. Philadelphia: Hanley and Belfus. Lindell, M. K., and R.W. Perry. 1992. Behavioral Foundations of Community Emergency Planning. Washington, DC: Hemisphere Press. Lindell, M. K., and R.W. Perry. 1998. Earthquake impacts and hazard adjustment by acutely hazard- ous materials facilities following the Northridge earthquake. Earthquake Spectra 14:285-299. Lindell, M. K., and R. W. Perry. 2001. Community innovation in hazardous materials management: Progress in implementing SARA Title III in the United States. J. Hazard Mater. 88:169-194. Lindell, M. K., and R. W. Perry. 2006. Onsite and offsite emergency preparedness. Pp. 1959-1971 in Encyclopedia of chemical processing, S. Lee, ed. New York: Marcel Dekker. Lindell, M. K., and R. W. Perry. 2007. Planning and preparedness. Pp. 113-141 in Emergency Management: Principles and Practice for Local Government, 2nd Ed., K. J. Tierney and W. F. Waugh, Jr., eds. Washington, DC: International City/County Management Association. McKenna, T. 2000. Protective action recommendations based upon plant conditions. J. Hazard. Mater. 75:145-164. Mendonça, D., and W. A. Wallace. 2004. Studying organizationally-situated improvisation in response to extreme events. Int. J. Mass Emergencies and Disasters 22:5-29. Mileti, D. S., J. D. Darlington, C. Fitzpatrick, and P. W. O’Brien. 1993. Communicating Earthquake Risk: Societal Response to Revised Probabilities in the Bay Area. Fort Collins, CO: Colorado State University Hazards Assessment Laboratory and Department of Sociology. NFPA (National Fire Protection Association). 2010. NFPA 1600: Standard on Disaster/Emergency Management and Business Continuity Programs. Quincy, MA: NFPA. NRT (National Response Team). 1987. Hazardous Materials Emergency Planning Guide. NRT-1. Washington DC: NRT. NRT. 1988. Criteria for Review of Hazardous Materials Emergency Plans. NRT-1A. Washington DC: NRT. Perry, R. W., and M. K. Lindell. 2007. Emergency Planning. Hoboken, NJ: John Wiley & Sons. Quarantelli, E. L., C. Lawrence, K. J. Tierney, and Q. T. Johnson. 1979. Initial findings from a study of socio-behavioral preparations and planning for acute chemical hazard disasters. J. .Hazard. Mater. 3:79-90. Rogers, G. and Sorensen, J. 1991. Adoption of Emergency Planning Practices for Chemical Hazards in the United States. Journal of Hazardous Materials. 27:3-26. Sorensen, J. H. and G. O. Rogers. 1988. Local Preparedness for Chemical Accidents: A survey of U.S. Communities. Industrial Crisis Quarterly 2:89-108. USNRC/FEMA (U.S. Nuclear Regulatory Commission/Federal Emergency Management Agency).

  1. Criteria for Preparation and Evaluation of Radiological Emergency Response Plans and

Preparedness in Support of Nuclear Power Plants. NUREG-0654/FEMA-REP-1. Washington, DC: USNRC/FEMA. Waugh, W. L., Jr. 1988. Current policy and implementation issues in disaster preparedness. Pp. 111- 125 in Managing Disaster: Strategies and Policy Perspectives, L. K. Comfort, ed. Durham, NC: Duke University Press. Webb, G. R., K. J. Tierney, and J. M. Dahlhamer. 2000. Business and disasters: Empirical patterns and unanswered questions. Nat. Hazards Rev. 1:83-90.

The Use and Storage of Methyl Isocyanate (MIC) at Bayer CropScience Copyright National Academy of Sciences. All rights reserved. Appendix D Policy Context of Inherently Safer Processes This appendix is an expansion of the discussion of the external policy con- text contained in Chapter 7. The purpose of this appendix is not to endorse any regulation or policy. Rather it is to provide a brief overview of the policy context in which inherently safer process assessments exist today. U.S. FEDERAL AND STATE REGULATIONS The U.S. Occupational Safety and Health Administration (OSHA) and Envi- ronmental Protection Agency (EPA) are the two main federal government bodies that administer regulations that potentially mandate, or encourage, inherently safer processes. Of these, OSHA is more relevant inside the plant because of its concern with the immediate safety of workers, whereas EPA regulations focus more on potential ramifications to more general environmental health and safety (Fallon et al., 2007; Malloy, 2008). Occupational Safety and Health Administration The OSHA process safety management of highly hazardous chemicals standard (29 CFR § 1910.119) requires companies handling listed hazardous ­chemicals to conduct a process hazard analysis (PHA), and develop a safety plan in accordance with 29 CFR 1910.119 (see also Fallon et al., 2007). It is there- fore potentially an institutional vehicle for the development of inherently safer processes in hazard planning at OSHA-supervised facilities, although it does not necessarily mandate such an approach. 179

The Use and Storage of Methyl Isocyanate (MIC) at Bayer CropScience Copyright National Academy of Sciences. All rights reserved. 180 USE AND STORAGE OF METHYL ISOCYANATE (MIC) AT BAYER CROPSCIENCE Within the process safety management standard, section 1910.119(c) man- dates employee participation in the elaboration of safety plans. The section states: “Employers shall consult with employees and their representatives on the conduct and development of process hazards analyses and on the development of the other elements of process safety management in this standard.” (29 CFR 1910.119 c) Despite this language the extent and methods of employee consultation are not described in the regulation. Buttressing employee participation in hazard manage- ment could be an effective organizational strategy for implementing inherently safer design in facilities with high risk for hazardous events, and warrants further research. Environmental Protection Agency (EPA) EPA policy has considered the possibility of inherently safer processes at least since the early 2000s, but measures regarding chemical accident prevention have tended to focus on prior planning and “inspection and to corrective and pre- ventive maintenance” (Ashford and Zwetsloot, 1999). Therefore, the concept of safety planning is far from new, but the far-reaching ramifications of inherently safer processes appear to require a greater degree of planning and technological investment than do traditional safety strategies that tend to be “failsafe” rather than “foolproof” (Ashford and Zwetsloot, 1999). The difficulties of implementing inherently safer design can be observed in the EPA Risk Management Program (RMP) (EPA, 2001), which is still intention- ally more oriented to risk management than risk prevention (Malloy, 2008), and as a policy matter does not mandate inherently safer processes. Nevertheless, companies dealing with hazardous chemicals must develop accident prevention plans during hazard emergency response planning, but this policy does not exten- sively involve stakeholders outside of firms (CCPS, 2009). Other pertinent regulations and laws include the Pollution Prevention Act (PPA), (which is not primarily directed at accidents) (Ashford and Caldhart, 2010), and the Department of Homeland Security’s Chemical Facility Anti- Terrorism Standards (CFATS) (Malloy, 2008). The post-September 11 approach is particularly amenable to inherently safer design (CCPS, 2009), because the unpredictable nature of terrorist attacks may create challenges for traditional assessments based on internal production risks. However, regulatory bodies have tended to conclude that inherently safer design shifts rather than pre- vents risks (Malloy, 2008). This is an important critique that warrants further research, because of the possibility that inherently safer technology may lead to the reallocating of risk to other areas of the production process (Hendershot, 2010).

The Use and Storage of Methyl Isocyanate (MIC) at Bayer CropScience Copyright National Academy of Sciences. All rights reserved. APPENDIX D 181 EUROPEAN SAFETY REGULATIONS Renewed European Policy for Chemicals The European Union’s Renewed European Policy for Chemicals (REACH) 2007 amendments (EC, 2006) require a registry system for hazardous chemicals, based on the “principle of substitution” (Garcia-Serna et al., 2007). Although REACH is primarily concerned with chemical toxicity, it also contains hazard prevention components. REACH is being gradually phased in, and technical sup- port on risk reduction is available Initially the REACH program was supervised by the European Chemicals Bureau (ECB) (Garcia-Serna et al., 2007), but in 2008 ECB was superseded by the European Chemicals Agency, which now runs a central database and registra- tion procedure. The program, is aimed at both producers and downstream users, and will mandate the progressive substitution of the most dangerous chemicals within a much larger system of registration. The crux of how REACH works in the case of dangerous chemicals is as follows: Substances with properties of very high concern will be made subject to authorization; the Agency will publish a list containing such candidate sub- stances. Applicants will have to demonstrate that risks associated with uses of these substances are adequately controlled or that the socioeconomic benefits of their use outweigh the risks. Applicants must also analyze whether there are safer suitable alternative substances or technologies. If there are, they must pre- pare substitution plans, if not, they should provide information on research and development activities, if appropriate. The Commission may amend or withdraw any authorization on review if suitable substitutes become available (EC, 2007). Seveso and Seveso II In the EU, the Seveso Directive (96/82/EC) revised the framework directive on Major Accident Hazards of Certain Industrial Activities, and for the first time promoted inherently safer processes as the recommended strategy for plant safety reports (Ashford and Zwetsloot, 1999; Zwetsloot and Ashford, 2003). In the late 1990s reforms were made, titled Seveso II (most recently updated in 2005). Seveso II is more directly oriented toward inherently safer processes than is the case for similar regulations in the United States. Under Seveso II, an operator must present a conceptual model for avoid- ing hazardous incidents, as well as documentation supporting the effective- ness of the safety plan (SFK, 2001). A more detailed comparison and examination of Seveso II’s mechanics is outside the scope of this appendix but Seveso II should be a priority for future research. It is also worth mentioning that Seveso II has important land use ramifica- tions. The different models of adoption of its directives in different EU member

The Use and Storage of Methyl Isocyanate (MIC) at Bayer CropScience Copyright National Academy of Sciences. All rights reserved. 182 USE AND STORAGE OF METHYL ISOCYANATE (MIC) AT BAYER CROPSCIENCE countries could provide interesting case studies for comparison (Basta et al., 2008). A preliminary review has found some evidence that European land use regulations are more explicitly oriented to creating frameworks for safer siting (Landucci et al., 2008). While further research into their details is required, two noteworthy examples are: a) “Decreto Ministeriale 9 Maggio 2001, Suppl. Ord. G. U. n.138 del 10/06/01, Requisiti minimi di sicurezza in materia di pianificazione urbanistica e territoriale per zone interessate da stabilimenti a rischio di incidente rilevante.” (Landucci et al., 2008) b) “Major Accident Commission, Technical Committee for Plant Safety (SFK/TAA Germany), Guidance SFK/TAA-GS-1, Recommendations for separation distances between establishments under major accidents ordinance and areas requiring protection within the framework of land use-planning (in German), Bonn (D), 2005” (Landucci et al., 2008) These regulations, and other similar ones, are potentially helpful illustrations of how local and county governments within the EU comply with Seveso II. For example, France employs a consequences-based approach, focusing on damages thresholds, whereas the Netherlands and the United Kingdom regulate on the basis of a risk-based approach, using “calculated risk indexes” (Cozzani et al., 2006).1 The former of these two methods tends to be more conservative, and prioritizes the reduction of inventories of hazardous materials. Therefore, although risk assessment can provide a starting point for analysis, a conse- quences-based approach may be more amenable to the creation of inherently safer land-use policies related to the siting of hazardous facilities (Cozzani et al., 2006). What is particularly different about the European approach, when compared with the U.S. approach, is the fluidity of the integration of land-use policy into safety policy. Example: United Kingdom The United Kingdom is involved in various policies to promote safer design. Health and Safety Executive’s (HSE) Policy and Guidance on Reducing Risks as Low as Reasonably Practicable in Design (HSE, 2003). It is a national level approach to assess safety management at the workplaces. This policy uses lan- guage suggesting an approach favoring inherent safety. However, more definite conclusions will require further research and comparison with OSHA regulations in the United States. 1  The U.S. Chemical Facility Anti-TerrorismStandards (72 Fed. Regist. 17688 [2007])) also uses risk-based performance safety.

The Use and Storage of Methyl Isocyanate (MIC) at Bayer CropScience Copyright National Academy of Sciences. All rights reserved. APPENDIX D 183 The UK also has a system of hazard prevention regulation in line with Seveso II, such as the Installation Handling Hazardous Substances Regulations (NIHHS), Control of Major Accidents Hazards Regulation (COMAH), the Planning Act 1990, and the Planning (Hazardous Substances) Regulations 1992 (Basta et al., 2008). Therefore, not only does the UK currently undertake workplace safety regulations that potentially promote inherently safer processes, but land-use plan- ning also interfaces with hazard planning (Basta et al., 2008). Coordination for these planning processes occurs under the auspices of the HSE, which takes a risk-oriented approach to chemical releases, but consequences-oriented approach to energy sector related risks (Basta et al., 2008). U.S. STATE REGULATIONS New Jersey New Jersey claims to be the first state to have implemented anti-terrorism and inherently safer process design into chemical plant regulation (Politicker NJ 2005), and the NJ Toxic Catastrophe Prevention Act Program is well discussed in current literature (see, e.g., CCPS, 2009). At present there are two primary pieces of legislation under which inherently safer systems and technology are regulated in the state: the New Jersey Domestic Security Preparedness Act (NJ OHSP, 2001) and the Toxic Catastrophe Prevention Act (TCPA) (NJ DEP, 2009; Fallon et al., 2007). New Jersey has the oldest and most developed toxic hazard regulation system in the United States, and its concept of inherently safer processes now extends to all registered facilities. TCPA was first passed in 1986, but only took force in 1988, and it now regulates all facilities using more than 10,000 pounds of listed hazardous substances per year (Fallon et al., 2007). The Bhopal accident inspired the first iteration of the TCPA, and the September 11, 2001, terrorist attacks led state officials to explore expansion the program to include concepts approximating inherently safer process requirements (CCPS, 2009). TCPA is overseen by the New Jersey Bureau of Release Prevention. Facili- ties must submit an offsite consequences report to the Bureau, while the State Domestic Security Preparedness Task Force2 oversees those regulations related to DSPA (Fallon et al., 2007). Using the CCPS’ framework, New Jersey established a concept of inherent safety based on reducing hazardous chemical stocks, find- ing less hazardous substitutes, using hazardous materials in their least dangerous form possible, and designing equipment with aims at eliminating equipment and human error (TCPA as cited in Fallon et al., 2007). The Task Force oversaw the important task of developing sector-specific industry best practices in conjunction with leading facilities. Now, TCPA facilities must, under a 2005 New Jersey executive order, comply with the Task Force’s 2  Overseen by the New Jersey Office of Homeland Security and Preparedness (OHSP).

The Use and Storage of Methyl Isocyanate (MIC) at Bayer CropScience Copyright National Academy of Sciences. All rights reserved. 184 USE AND STORAGE OF METHYL ISOCYANATE (MIC) AT BAYER CROPSCIENCE best practices (Fallon et al., 2007).3 For TCPA facilities, compliance involves conducting a review, and produces a reviewable assessment, of the viability of implementing inherently safer strategies and technology during mandatory vul- nerability assessments related to antiterrorism regulations (CCPS, 2009). This review was a 120-day process and only led to 19 percent of facilities finding new measures, and less than half made no new recommendations. However, CCPS notes that the existing hazard reduction framework had been in place since the 1985 introduction of the TCPA, and many facilities may have already incorpo- rated most practicable inherently safer policies. In sum, inherent safety reviews must be undertaken in all TCPA-regulated processes, and also in the case of vulnerability assessments under New Jersey state security requirements. In terms of creating an institutional environment to facilitate compliance, various consultants are now engaged in providing services to companies regulated under the New Jersey regulations, including, for example, Accu-Tech (2011) and Chilworth (2011). Moreover, New Jersey keeps data and plans prepared under the TSPA and DSPA confidential and privileged (P.L. 1963, c. 73 (C.47:1A-1 et seq; CCPS, 2009). This policy decision stems from a desire to create trust between facilities and regulators. Under the antiterrorism executive order, the New Jersey Domestic Security Preparedness Task Force submitted an inherently safer technol- ogy (IST) checklist to facilities hosting hazardous processes, which is one method recommended by Amyotte et al. (2007). Those authors also recommended policies based upon carefully designed guidewords—such as minimize, substitute, moder- ate, and simplify—that can be incorporated into hazard management planning to improve compliance with checklists. The idea behind checklists and guidewords is standardizing the concepts of inherent safety within the culture of facilities design and process management. On that note, one benefit of the longevity of New Jersey’s program is the potential to examine its effectiveness at standardizing the culture of inherent safety, which may prove necessary in creating programs to encourage more wide spread adoption of inherently safer design and technology. California Contra Costa County Contra Costa’s legislation4 (County Ordinance Chapter 450-8) provides an additional layer of regulation for facilities that are already under California Acci- dental Release Prevention (CalARP) and EPA supervision (CCPS, 2009). The Contra Costa Industrial Safety Ordinance (ISO) dates from 1998 after a series 3  However, under DSPA the number of reporting facilities is much greater, and over 800 facilities had to provide special vulnerabilities assessments (Fallon et al., 2007). 4  The Industrial Safety Ordinance has also been adopted by the City of Richmond, which is in Contra Costa County.

The Use and Storage of Methyl Isocyanate (MIC) at Bayer CropScience Copyright National Academy of Sciences. All rights reserved. APPENDIX D 185 of incidents spurred resident concern (Malloy, 2008). Like New Jersey, Contra Costa is also home to a national-level concentration of chemical plants, which brought heightened safety scrutiny, along with the need to protect the economic base the plants provide. These facilities must submit their safety plans to the county and show, through supporting documentation, that they have “to the greatest extent feasible” implemented safer systems (Malloy, 2008 and County Ordinance Chapter 450- 8.016(d)(3)). Under the Contra Costa Program Guidance document, determina- tions that inherently safer options are not feasible are more strictly scrutinized than in New Jersey. For a facility not to implement an inherently safer process requires conflict with the law, a financial analysis demonstrating economic infea- sibility, or an analysis based upon generally accepted engineering principles that risk will increase (Malloy, 2008). This requires weighing the circumstances, and in practice is designed to elicit proof that facilities have identified and acted to minimize hazard. However, at early stages of the Contra Costa program, efforts were limited by a lack of guidance as to expectations and best practices regard- ing inherently safer systems. CCPS has identified the publication of guidelines as important in fostering reasonable expectations about feasibility (CCPS, 2009). The Contra Costa County program is also much smaller than the New Jersey program, including only nine facilities (seven in the county and two in the City of Richmond): “two Air Products facilities (within the Shell Refinery and the Tesoro Refinery), ConocoPhillips Rodeo Refinery, Air Liquide-Rodeo Hydrogen Plant, General Chemical West’s Bay Point Works, Shell Oil Martinez Refinery and Tesoro Golden Eagle Refinery. The City of Richmond’s Industrial Safety Ordinance (Municipal Code Chapter 6.43, RISO) is almost identical (except for the 2006 amendment) to the County’s Industrial Safety Ordinance. The two facilities located in Richmond that are subject to this ordinance include: Chevron Richmond Refinery and General Chemical West’s Richmond Works” (Contra Costa Health Services, 2011a). Another important difference between the New Jersey initiative and that in Contra Costa is that the CalARP Program Guidance Document5 (compliance plan document) is administered by the Contra Costa Health Services Department, and not a security-oriented or industry-oriented regulator. However, the program’s key elements are very similar to New Jersey’s and include a 5-year incident his- tory, an offsite consequence analysis, process hazard analysis, 3-year compliance audits,6 emergency response planning, and a risk management plan (Contra Costa Health Services, 1998). Newer elements of the program include more focus on “human factors,” including safety culture assessments and security vulnerability analysis (Contra 5  http://cchealth.org/groups/hazmat/california_accidental_release_prevention_guidance_document. php. 6  The county is currently in its fourth round of audits.

The Use and Storage of Methyl Isocyanate (MIC) at Bayer CropScience Copyright National Academy of Sciences. All rights reserved. 186 USE AND STORAGE OF METHYL ISOCYANATE (MIC) AT BAYER CROPSCIENCE Costa Health Services, 2011b). County administrators claim that major accidents and releases have declined at a steady rate since the ISO’s implementation in 2000.7 It should be noted that in the Contra Costa and New Jersey programs, lim- ited public access to information about the facilities creates barriers to rigorous external evaluation of their performance (Malloy, 2008; CCPS, 2009). Beyond Contra Costa County, other California policies do appear to be rel- evant to inherently safer concepts. These include the Cal/EPA Green Chemistry Initiative, the California Accidental Release Prevention Program (CARPP), and the Silicon Valley Toxic Gas Ordinance. Green Chemistry California Assembly Bill 1879 directs the California Department of Toxic Substances Control (DTSC) to create a system for reducing, substituting, and in some cases banning chemicals of concern (Heartney and Norris, 2008). A “Green Ribbon Science Panel” has been established to advise the California Green Chemistry Initiative (CA DTSC, 2011), which will include a Toxics Information Clearing House. This is a more stringent pollution reduction program than the EPA’s Toxic Release Inventory (TRI), because it gives state regulators the ability to target specific chemicals, and design management and reduction processes for them throughout their lifecycle, including the “design, manufacturing, and distri- bution processes.” (CA DTSC, 2008a,b) This legislation is primarily concerned with exposure. California Accidental Release Prevention (CalARP) Program The CalARP Program requires risk management plans for facilities, as well as assessments of seismic risks, but does not explicitly mandate inherently safer design. It is a program similar to EPA’s Risk Management Program, although stricter and more detailed. One notable difference is the emphasis on stake- holder involvement in the planning process (Sawyer, 2010; Contra Costa Health Services, 2012). On the subject of worker involvement, the regulation requires training and information on safety management planning. However, this process is not central to the regulations, although, the programs administrators do include the following language in a document titled “Agency Guidance”: Never forget about who’s actually running the plant: it’s the “hourly” workers. As CalARP Program regulators, we’re typically only interacting with plant manage- 7  The graphs provided do not include four major chemical accidents or releases (MCAR), which occurred in November 2010 but produced limited effects to the community, nor do they include transportation-related events. This is an important gap in the data, given arguments that reducing onsite storage risk may increase transportation-related risks.

The Use and Storage of Methyl Isocyanate (MIC) at Bayer CropScience Copyright National Academy of Sciences. All rights reserved. APPENDIX D 187 ment, engineers, and “salaried” RMP/PSM staff. In theory, these ­people know how their plant operates and ultimately make decisions on process changes. In reality, it’s the hourly workers who really know the nuances of the operation, and can be invaluable in foreseeing the effects of any proposed modifications. This is one area of the Prevention Program where both the plant manager and the youngest apprentice should be regarded on the same level. Make sure that the plant manager and the hourly workers are both somehow included in this em- ployee participation plan. Don’t forget about contractors too, although if there’s going to be some major change, chances are that contractors are going to be involved as part of the mix at the management level anyway.8 (CA OES, 2005). Santa Clara County Toxic Gas Ordinance In Silicon Valley, Santa Clara County has implemented a Toxic Gas Ordi- nance to control dangerous conditions related to toxic gases. The ordinance dates from 1990 (Stanford University, 2009). This is a targeted program within the semi-conductor industry. SELECTED INTERNATIONAL GUIDELINES United Nations Environmental Program (UNEP) The United Nations Environment Program (UNEP) has produced A Flex- ible Framework for Addressing Chemical Accident Prevention and Preparedness (UNEP, 2009). Discussing the role of stakeholders, UNEP specifically mentions that one role of industrial management is to promote inherently safer processes. The UN’s direct role in managing chemical accident hazard is minimal, but it does have the capability of promoting common practices and discourse in a glob- ally consolidating industry. Therefore, implementation of inherently safer produc- tion within globally fluid supply chains could be aided by the UN framework. Organisation for Economic Cooperation and Development (OECD) Organisation for Economic Cooperation and Development (OECD) has pro- duced a detailed set of guidelines (OECD Guiding Principles for Chemical Acci- dent Prevention, Preparedness, and Response) for developing hazard management planning, and safety procedures in the relevant industries of its member countries. Although the document is not organized around the concept of inherent safety, it does state that: “Public authorities should encourage industry to take measures to improve safety, for example by utilizing the principles of inherently safer technol- 8  See California Regulations: http://www.oes.ca.gov/Operational/OESHome.nsf/PDF/CalARP%20 Guidance%201-31-05/$file/CalARPGuid1-05.pdf.

The Use and Storage of Methyl Isocyanate (MIC) at Bayer CropScience Copyright National Academy of Sciences. All rights reserved. 188 USE AND STORAGE OF METHYL ISOCYANATE (MIC) AT BAYER CROPSCIENCE ogy.” (OECD, 2003) Furthermore, the OECD recommends the establishment of safety performance indicator (SPI) programs. What distinguishes the OECD program from others is its extensive and detailed discussion of risk and hazard identification between facilities and stake- holder groups, including workers, the general public, and management. It is also noteworthy that the guidelines involve stakeholders in the assessment of accept- able community risks in the production process. International Labor Organization (ILO) Guidelines The International Labor Organization (ILO) has developed a set of workplace safety guidelines, incorporating a Plan Do Check Act (PDCA) system (SFK, 2001). What distinguishes the ILO model is a focus on employee participation in the creation of health and safety management systems (ILO, 2001). Further research could compare the ILO guidelines with actual practices at chemical plants in the United States. GENERAL COMMENTS Barriers include the perception that inherent safety is impractical or costly, the lack of institutional infrastructure and frameworks for evaluating inherently safer processes, and a lack of standards and guidance measures for existing opera- tions (CCPS, 2009). In order to prove more effective than existing practices, inherently safer programs must be distinguished from mitigation focused on “engineered safety” (device-centered) and “procedural safety” (behaviorally-centered) (Amyotte et al., 2007). Moreover the literature focuses on the benefits of beginning the plan- ning process as early as possible in the production lifecycle (Mary Kay O’Connor Process Safety Center, 2002).9 Current programs, such as those found in New Jersey and Contra Costa County, include broad mandates which might be improved through focusing efforts for improvements on more discrete elements of the production and tech- nology development process. Given that some studies have found that nearly 45 percent of incident causation is attributable to process and equipment integrity and process knowledge failures (Amyotte et al., 2007), these could be crucial phases of process to focus efforts for promoting inherent safety. 9  Malloy (2008) notes that some industry groups (DHS and American Chemical Council) criticize the concept of inherent safety because of its vagueness, arguing that it could lead to arbitrary penalties and results that actually increase facility risk.

The Use and Storage of Methyl Isocyanate (MIC) at Bayer CropScience Copyright National Academy of Sciences. All rights reserved. APPENDIX D 189 REFERENCES AcuTech. 2011. Inherently Safer Technology (IST). AcuTech, Alexandria, VA [online]. Available: http://www.acutech-consulting.com/images/file/AcuTech%20IST%20Flyer.pdf. Accessed: Oct 11, 2011. Amyotte, P. R., A. U. Goraya, D. C. Hendershot, and F. I. Khan. 2007. Incorporation of inherent safety principles in process safety management. Process Saf. Prog. 26(4):333-346. Ashford, N. A., and C. C. Caldhart. 2010. Government regulation of environmental and occupa- tional health and safety in the United States and the European Union. Pp. 640-663 in Occu- pational and Environmental Health: Recognizing and Preventing Disease and Injury, 6th Ed., B. S. Levy, D. H. Wegman, S. L. Baron, and R. K. Sokas, eds. New York: Oxford University Press [online]. Available: http://18.7.29.232/bitstream/handle/1721.1/55358/Chapter-30%20_ GovRegOfEnvl%26OccH_9Feb10.pdf?sequence=1. Accessed: Sept. 29, 2011. Ashford, N. A., and G. Zwetsloot. 1999. Encouraging inherently safer production in European firms: A report for the field. J. Hazard. Mater. 73(1-3):123-144. Basta, C., M. Christou, M. Struckl, and B. Ale. 2008. Translating the Risk of Major Accidents into Opportune Safety Distances from Dangerous Establishments: Recent Developments of the Eu- ropean Regulation as Deriving from Selected National Practices. Presentation at the PSAM08 International Congress, May 18-23, 2008, Hong Kong [online]. Available: http://www.delft cluster.nl/website/files//PSAM9_0421_paper.pdf. Accessed: Sept. 30, 2011. CA DTSC (California Department of Toxic Substances Control). 2008a. California Green Chem- istry Initiative, Final Report [online]. Available: http://www.dtsc.ca.gov/ PollutionPrevention/ GreenChemistryInitiative/upload/GREENChem.pdf. Accessed: Sept. 30, 2011. CA DTSC. 2008b. California Green Chemistry Initiative: Frequently Asked Questions. [online]. Available: http://www.dtsc.ca.gov/PollutionPrevention/GreenChemistryInitiative/ upload/FAQs greenchem.pdf. Accessed: Oct. 6, 2011. CA DTSC. 2011. Green Ribbon Science Panel Overview [online]. Available: http://www.dtsc.ca.gov/ PollutionPrevention/GreenChemistryInitiative/GreenRibbon.cfm. Accessed: Oct. 6, 2011. CA OES (California Governor’s Office of Emergency Services). 2005. California Accidental Release Prevention (CAlARP) Program: Administrative Agency Guidance [online]. Available: http:// www.oes.ca.gov/Operational/OESHome.nsf/PDF/ CalARP%20Guidance%201-31-05/$file/ CalARPGuid1-05.pdf. Accessed: Oct. 5, 2011. CCPS (Center for Chemical Process Safety). 2009. Inherently Safer Chemical Processes: A Life Cycle Approach, 2nd Ed. Hoboken, NJ: John Wiley & Sons. Chilworth. 2011. Chilworth Global, Princeton, NJ [online]. Available: http://www.chilworth.com/ consulting_team.cfm. Accessed: Oct. 11, 2011. Contra Costa Health Services. 1998. CalARP Program Guidance Document, July 1, 1998 [on- line]. Available: http://cchealth.org/groups/hazmat/california_accidental_release_ prevention_ guidance_document.php. Accessed: Oct 6, 2011. Contra Costa Health Services. 2011a. Industrial Safety Ordinance [online]. Available: http://cchealth. org/groups/hazmat/industrial_safety_ordinance.php. Accessed: Oct. 6, 2011. Contra Costa Health Services. 2011b. Industrial Safety Ordinance: Annual Performance Review and Evaluation Report, January 25, 2011 [online]. Available: http://cchealth.org/groups/hazmat/pdf/ iso/iso_report_2010.pdf. Accessed: Sept. 30, 2011. Contra Costa Health Services. 2012. Risk Management Program, CalARP and ISO Differences [on- line]. Available: http://cchealth.org/groups/hazmat/differences_rmp_calarp_iso.php. Accessed: Oct. 6, 2011. Cozzani, V., R. Bandini, C. Basta, and M. D. Christou. 2006. Application of land-use planning criteria for the control of major accident hazards: A case-study. J. Hazard. Mater. 136(2):170-180.

The Use and Storage of Methyl Isocyanate (MIC) at Bayer CropScience Copyright National Academy of Sciences. All rights reserved. 190 USE AND STORAGE OF METHYL ISOCYANATE (MIC) AT BAYER CROPSCIENCE EC (European Commission). 2006. Regulation (EC) No 1907/2006 of the European Parliament and of the Council of 18 December 2006 concerning the Registration, Evaluation, Authorization and Restriction of Chemicals (REACH), establishing a European Chemicals Agency, amending Directive 1999/45/EC and repealing Council Regulation (EEC) No 793/93 and Commission Regulation (EC) No 1488/94 as well as Council Directive 76/769/EEC and Commission Direc- tives 91/155/EEC, 93/67/EEC, 93/105/EC and 2000/21/EC [online]. Available: http://eur-lex. europa.eu/LexUriServ/ LexUriServ.do?uri=CELEX:32006R1907:en:NOT. Accessed: Oct. 3, 2011. EC. 2007. REACH in Brief. European Commission Environment Directorate General, October 2007 [online]. Available: http://ec.europa.eu/environment/ chemicals/reach/pdf/2007_02_reachin brief.pdf. Accessed Oct. 4, 2011. EPA (U.S. Environmental Protection Agency). 2001. Hazardous Materials Emergency Planning Guide. NRT 1. National Response Team, U.S. Environmental Protection Agency. July 2001 [online]. Available: http://www.epa.gov/oem/docs/chem/ cleanNRT10_12_distiller_complete. pdf. Accessed: Oct. 3, 2011. Fallon, R., D. M. Keller, M. Lenkowsky, T. C. Lung, R. Mosquea, E. Olsen, V. Remoquillo, and P. C. Steele. 2007. Chemical Security in New Jersey: An Overview of Planning, Information Shar- ing, and Response, June 11, 2007. Maxwell School of Syracuse Universitty [online]. Available: http://insct.syr.edu/uploadedFiles/insct/uploadedfiles/PDFs/Chemical%20Security%20in%20 New%20Jersey.pdf. Accessed: Oct. 3, 2011. Garcia-Serna, J., L. Perez-Barrigon, and M. J. Cocero. ��������������������������������������������

  1. New trends for design towards sustain-

ability in chemical engineering: Green engineering. Chem. Eng. J. 135(1-3):7-30. Heartney, M. T., and T. H. Norris. 2008. Update 1: California Enacts Sweeping “Green Chemistry” Laws. Client Advisory, October 2008. Arnold & Porter, LLP [online]. Available: http://www. martindale.com/environmental-law/article_Arnold-Porter-LLP_531198.htm. Accessed: Sept. 29, 2011. Hendershot, D. C. 2010. A summary of inherently safer technology. Process Saf. Prog. 29(4):389-392. HSE (Health and Safety Executive). 2003. Policy and Guidance on Reducing Risks as Low as Reason- ably Practicable in Design. Health and Safety Executive, UK [online]. Available: http://www. hse.gov.uk/risk/theory/alarp3.htm. Accessed: Oct. 6, 2011. ILO (International Labor Organization). 2001. Background. Chapter 1 in Guidelines on Occupa- tional Safety and Health Management Systems. ILO-OSH 2001. SafeWork/ILO, Geneva [on- line]. Available: http://www.ilo.org/wcmsp5/groups/public/---ed_protect/---protrav/---safework/ documents/publication/wcms_110496.pdf. Accessed: Oct. 3, 2011. Landucci, G., A. Tugnoli, C. Nicolella, and V. Cozzani. Assessment of inherently safer technologies for hydrogen production. Proceedings of the 5th International Seminar on Fire and Explosion Hazards, Edinburgh, UK, 23-27 April 2007. Edited by D. Drysdale, D. Bradley, V. Molkov and R. Carvel. Published by the School of Engineering and Electronics, University of Edinburgh,

  1. ISBN: 978-0-9557497-2-8. Pp. 138-148. Available: http://www.see.ed.ac.uk/feh5/pdfs/

FEH_pdf_pp138.pdf Malloy, T. 2008. Of natmats, terrorists, and toxics: Regulatory adaptation in a changing world. J. Environ. Law Policy 26(1):93-127. Mary Kay O’Connor Process Safety Center. 2002. White Paper: Challenges in Implementing Inherent Safety Principles in New and Existing Chemical Processes. Mary Kay O’Connor Process Safety Center, Texas Engineering Experiment Station, Texas A & M University System, College Sta- tion, TX [online]. Available: http://pscfiles.tamu.edu/library/center-publications/white-papers- and-position-statements/whitepaper_inherentsafety1.pdf. Accessed: Oct. 3, 2011. NJ DEP (New Jersey Department of Environmental Protection). 2009. Toxic Catastrophe Prevention Act (TCPA) Program [online]. Available: http://www.nj.gov/dep/rpp/brp/tcpa/. Accessed: Oct. 11, 2011.

The Use and Storage of Methyl Isocyanate (MIC) at Bayer CropScience Copyright National Academy of Sciences. All rights reserved. APPENDIX D 191 NJ OHSP (New Jersey Office of Homeland Security & Preparedness. 2001. New Jersey Domestic Security Preparedness Act [online]. Available: http://www.state.nj.us/njhomelandsecurity/about- us/dsptf.html. OECD (Organisation for Economic Co-operation and Development). 2003. Guiding Principles for Chemical Accident Prevention, Preparedness and Response: Guidance for Industry (Including Management and Labour), Public Authorities, Communities and Other Stakeholders. Series on Chemical Accidents No. 10. Paris: OECD [online]. Available: http://www.oecd.org/data oecd/10/37/2789820.pdf. Accessed: Oct. 7, 2011. Politicker NJ. 2005, November 29. New Jersey Becomes First State to Require Chemical Plant Se- curity Measures to Protect Against Terrorist Attack [online]. Available: http://www.politickernj. com/acting-governor-richard-j-codey-3. Accessed: Oct. 6, 2011. Sawyer, R. 2010. Writen Testimony of Randall L. Sawyer, Director, Contra Costa Health Services, Hearing on “Work Place Safety and Worker Protections in the Gas and Oil Industry” Before the Committee on Health, Education, Labor and Pensions, Subcommittee on Employment and Workplace Safety, U.S. Senate, June 10, 2010 [online]. Available: http://help.senate.gov/imo/ media/doc/Sawyer.pdf. Accessed: Oct. 3, 2011. SFK (Störfall-Kommission-Hazardous Incidents Commission). 2001. Aid for Integration of Safety Management System Pursuant to Annex III of the Hazardous Incident Ordinance of 2000 Within Existing Management Systems. SFK-GS-31. Prepared by the Working Group on Management Systems, Adapted at the 37th Meeting of the Hazardous Incidents Commission (SFK) on May 30, 2001. SFK Major Hazard Commission under the Federal Minister for the Environment, Nature Conservation and Nuclear Safety(BMU), Germany [online]. Available: http://www. kas-bmu.de/publikationen/sfk_gb/sfkgs31engl.pdf. Accessed: Oct. 3, 2011. Stanford University. 2009. Background on Santa Clara County’s Toxic Gas Ordinance [online]. Available: http://www.stanford.edu/dept/EHS/prod/researchlab/lab/tgo/08-133.pdf. Accessed: Oct. 11, 2011. UNEP (United Nations Environment Programme). 2009. A Flexible Framework for Addressing Chemical Accident Prevention and Preparedness: United Nations Environment Programme, January 27, 2009 [online]. Available: http://www.unep.fr/scp/sp/saferprod/pdf/Flexible Framework_Guidance_270109.pdf. Accessed: Oct. 7, 2011. Zwetsloot, G., and N. A. Ashford. 2003. The feasibility of encouraging inherently safer production in industrial firms. Safety Sci. 14(2/3): 219-240.

The Use and Storage of Methyl Isocyanate (MIC) at Bayer CropScience Copyright National Academy of Sciences. All rights reserved.

The Use and Storage of Methyl Isocyanate (MIC) at Bayer CropScience Copyright National Academy of Sciences. All rights reserved. Appendix E Meeting Agendas Inherently Safer Chemical Processes: The Use of Methyl Isocyanate (MIC) at Bayer CropScience The National Academy of Sciences Keck Center 500 Fifth Street, N.W., Room 100 Washington, DC 20001 AGENDA February 9, 2011 10:30 a.m. Welcome

• Elsa Reichmanis, Committee Chair 10:35 a.m. Overview of the National Academy of Sciences Study

• Kathryn Hughes, National Research Council 10:50 a.m. Context of the Study and Overview of CSB Investigation

• Amy McCormick and Lucy Sciallo-Tyler, U.S. Chemical Safety and Hazard Investigation Board (Study Sponsors) 11:30 a.m. Lunch

• Lunch available in the Keck Center Atrium on the 3rd floor 12:30 p.m. Overview of the use of MIC at Bayer CropScience

• Steven Smythe, Bayer CropScience 2:30 p.m. Overview of Inherently Safer Chemical Processes and Practices

• Scott Berger, Center for Chemical Process Safety, AIChE

• Randall Sawyer, Contra Costa County 193

The Use and Storage of Methyl Isocyanate (MIC) at Bayer CropScience Copyright National Academy of Sciences. All rights reserved. 194 USE AND STORAGE OF METHYL ISOCYANATE (MIC) AT BAYER CROPSCIENCE 3:20 p.m. Break 3:30 p.m. Defining Inherently Safer Processes at DHS

• George Famini and George Emmett, DHS Chemical Security Analysis Center 4:00 p.m. Public Comment Session

• Please sign up to speak during the public comment session

• All comments limited to 3 minutes 4:30 p.m. Transition to Just-in-Time Production of MIC

• John Carberry, Carberry EnviroTech 5:15 p.m. Adjourn Open Session Inherently Safer Chemical Processes: The Use of Methyl Isocyanate (MIC) at Bayer CropScience West Virginia State University Alumni Center Institute, WV 25112 AGENDA March 21, 2011—WVSU Alumni Center 6:15 p.m. Public Comment Session

• Please sign up to speak during the public comment session

• All comments limited to 3 minutes

Welcome

• Elsa Reichmanis, Committee Chair

Overview of National Academy of Sciences Study

• Kathryn Hughes, National Research Council 8:15 p.m. Adjourn Open Session

• Note: May adjourn earlier if no additional comments March 22, 2011—WVSU Alumni Center 11:20 a.m. Presentation—Bayer CropScience

• EHS and Training Procedures and Policies 12:30 p.m. Adjourn Open Session

The Use and Storage of Methyl Isocyanate (MIC) at Bayer CropScience Copyright National Academy of Sciences. All rights reserved. APPENDIX E 195 Inherently Safer Chemical Processes: The Use of Methyl Isocyanate (MIC) at Bayer CropScience National Academies Keck Center 500 Fifth Street, NW, Room 100 Washington, DC 20001 AGENDA May 24, 2011—Keck Center, Room 105 9:30 a.m. Kanawha Putman Emergency Planning Committee (via telephone)

• Matthew Blackwood et al. 10:15 a.m. Overview of the EPA Risk Management Program (tentative)

• Craig Mattheisson, EPA Inherently Safer Chemical Processes: The Use of Methyl Isocyanate (MIC) at Bayer CropScience National Academies Jonsson Center Woods Hole, Massachusetts AGENDA August 8, 2011 11:00 a.m. Patrick Ragan, Bayer CropScience

• Vice President Quality, Health, Safety and Environment, North America

The Use and Storage of Methyl Isocyanate (MIC) at Bayer CropScience Copyright National Academy of Sciences. All rights reserved.

The Use and Storage of Methyl Isocyanate (MIC) at Bayer CropScience Copyright National Academy of Sciences. All rights reserved. Appendix F Biographies of Committee Members Elsa Reichmanis (NAE) is a professor of chemical and biomolecular engineer- ing at the Georgia Institute of Technology. Prior to joining Georgia Tech, she was director of materials research at Bell Labs, Alcatel-Lucent. She is noted for the discovery, development, and engineering leadership of new families of lithographic materials and processes that enable very large scale integration manufacturing. Her research interests include the design and development of polymeric and hybrid organic/inorganic materials for electronic and photonic applications. A particular focus relates to organic/polymer semiconducting mate- rials and processes for plastic electronics and photovoltaics. She is the recipient of several awards, was elected to the National Academy of Engineering in 1995, and has participated in several National Research Council (NRC) activities. She currently serves as a member of the National Science Foundation (NSF) Math and Physical Sciences Advisory Committee, she recently served as cochair of the NRC Board on Chemical Sciences and Technology, and was a member of the Visiting Committee on Advanced Technology of the National Institute of Standards and Technology (NIST). She is an elected member of the Bureau of the International Union for Pure and Applied Chemistry (IUPAC). She has been active in the American Chemical Society throughout her career, having served as 2003 President of the Society. In other technical activities, she served as a member of the Air Force Scientific Advisory Board and is an associate editor of the ACS journal, Chemistry of Materials. Paul Amyotte is a professor of chemical engineering in the Department of Pro- cess Engineering and Applied Science, and the C.D. Howe Chair in Engineering, at Dalhousie University, Halifax, Canada. He holds a bachelor’s degree from the 197

The Use and Storage of Methyl Isocyanate (MIC) at Bayer CropScience Copyright National Academy of Sciences. All rights reserved. 198 USE AND STORAGE OF METHYL ISOCYANATE (MIC) AT BAYER CROPSCIENCE Royal Military College of Canada, a master’s from Queen’s University, and a Ph.D. from the Technical University of Nova Scotia, all in chemical engineering. He is a fellow of the Chemical Institute of Canada, the Engineering Institute of Canada, and Engineers Canada. He is a past president of the Canadian Society for Chemical Engineering and of the Association of Professional Engineers of Nova Scotia, and is a past chair of the Canadian Engineering Qualifications Board. He is the editor of the Journal of Loss Prevention in the Process Industries, and has recently served as chair of the Safety and Security Strategic Projects Panel of the Natural Sciences and Engineering Research Council of Canada. Dr. Amyotte’s teaching, research, and practice interests are in the areas of process safety, inher- ently safer design, and dust explosion risk reduction. He has consulted to industry, government, and academia in these and related areas, and has published or pre- sented approximately 180 papers in the field of industrial safety. Recent research accomplishments and professional engagements include the delivery of keynote lectures at the 2010 Mary Kay O’Connor Process Safety Center Annual Sympo- sium and Nanosafe 2010 (International Conference on Safe Production and Use of Nanomaterials), expert testimony at the U.S. Chemical Safety and Hazard Investigation Board public hearing on the Kleen Energy natural gas explosion (June 2010), and coauthorship with Professor Trevor Kletz on the second edition of Process Plants: A Handbook for Inherently Safer Design published by the Taylor & Francis Group in 2010. Peter Beak (NAS) is CAS Professor Emeritus at the University of Illinois at Urbana-Champaign. Dr. Beak’s research interests are in synthetic, structural, and mechanistic organic chemistry, new reaction processes, synthetic methodology, and reactive intermediates, and his work has clarified the effect of molecular environment on structure—stability relationships, provided new reactions that are widely used for chemical synthesis, and identified novel reactive intermediates. His current research involves the determination of reaction trajectories in atom- transfer reactions and asymmetric synthesis. Dr. Beak has held editorships, lec- tureships, and leadership positions in professional organizations. He has received a number of awards, lectured around the world, and served as research advisor for more than 100 graduate and postdoctoral students. Dr. Beak served on the NRC committee that authored the 1995 edition of Prudent Practices in the Laboratory. Dr. Beak is a member of the National Academy of Sciences (elected in 2003) and the American Academy of Arts and Sciences. He received his B.A. from Harvard University in 1957 and his Ph.D. from Iowa State University in 1961 and then joined the faculty at Illinois. Michael L. P. Elliott is the associate director, Center for Quality Growth and Regional Development, and associate professor, with joint appointments to the Schools of City and Regional Planning and Public Policy at the Georgia Insti- tute of Technology. He is a cofounder and has served as codirector of both the

The Use and Storage of Methyl Isocyanate (MIC) at Bayer CropScience Copyright National Academy of Sciences. All rights reserved. APPENDIX F 199 Consortium on Negotiation and Conflict Resolution and the Southeast Negotia- tion Network. Dr. Elliott’s work, both as a researcher and mediator, focuses on community engagement, environmental dispute management, risk perception and management, and environmental planning and policy. His particular expertise lies in the design and evaluation of environmental dispute resolution and participatory processes, and in the mediation of public policy disputes, especially as they relate to toxics and their management. In these capacities, he has worked regionally on issues ranging from specific conflicts over solid and hazardous waste and the sit- ing and managing of locally unwanted facilities to the design of local and regional policies for managing environmental risk, natural resources, and the quality of growth. Nationally, he has worked with agencies such as the U.S. Environmental Protection Agency, the National Park Service, the Army Environmental Policy Institute, the U.S. Council on Environmental Quality, and the President’s Confer- ence on Cooperative Conservation. Internationally, he has provided consultations and training for resolving environmental and land disputes in Estonia, Israel and Palestine, Nicaragua, Kazakhstan, and Germany. Dr. Elliott received his B.S. and Ph.D. from Massachusetts Institute of Technology and his M.C.P. from the University of California, Berkeley. Wayne B. Gray holds the John T. Croteau Chair in Economics at Clark Univer- sity, where he has taught since 1984, when he received his Ph.D. in economics from Harvard University. Dr. Gray is also a research associate at the National Bureau of Economic Research and the director of the Boston Census Research Data Center. He has served as a member of the U.S. Environmental Protection Agency’s (EPA’s) Advisory Council for Clean Air Compliance Analysis, the Science Advisory Board for Massachusetts’ Executive Office of Environmental Affairs, and a National Research Council committee examining proposed changes in EPA’s New Source Review program. Dr. Gray’s research focuses on the effec- tiveness and economic impact of government regulation of environmental and workplace hazards, including studies on productivity, investment, and plant loca- tion, working with plant-level data for steel mills, oil refineries, and pulp and paper mills. He has examined regulation of air and water pollution, and measured the effects of enforcement on compliance status and pollution emissions. He has also written several papers on the effectiveness of Occupational Safety and Health Administration enforcement activity, examining impacts on regulatory compli- ance, workplace injuries, and exposures to hazardous substances. Dennis C. Hendershot has been a staff consultant for the Center for Chemical Process Safety (CCPS) since 2005, and serves as editor of the monthly CCPS Process Safety Beacon. Mr. Hendershot spent 35 years working for Rohm and Haas Company, in process research and development for a variety of agricultural, chemical, acrylic monomer, and polymer processes. Since the late 1970s he has worked in development and implementation of process safety management pro-

The Use and Storage of Methyl Isocyanate (MIC) at Bayer CropScience Copyright National Academy of Sciences. All rights reserved. 200 USE AND STORAGE OF METHYL ISOCYANATE (MIC) AT BAYER CROPSCIENCE grams, including HAZOP, fault tree analysis, quantitative risk analysis, incident investigation, and process risk management systems. From 2005 through 2008, Mr. Hendershot worked with Chilworth Technology as a principal process safety specialist. Mr. Hendershot is a fellow of the American Institute of Chemical Engi- neers (AIChE), a fellow of the Center for Chemical Process Safety, and a member of the American Chemical Society. Mr. Hendershot was chair of the Safety and Health Division of AIChE, and a member of the AIChE Board of Directors. He has chaired a number of subcommittees of CCPS, including inherently safer design, risk assessment, hazard evaluation procedures, reactive chemistry, risk tolerance criteria, and undergraduate education. Mr. Hendershot has received the AIChE Doyle Award for the best paper presented at the annual Loss Prevention Symposium twice (1989 and 2002), and received AIChE’s Walton-Miller Award for contributions to process safety in 2006. In 2000, the Mary Kay O’Connor Process Safety Center at Texas A&M University presented Mr. Hendershot with its Merit Award for contributions to Process Safety. Andrea Kidd Taylor is a lecturer at the Morgan State University (MSU) School of Community Health and Policy (SCHP) in Baltimore, Maryland. She has more than 25 years’ experience in occupational and environmental health and safety. Before joining the MSU faculty, Dr. Taylor served a 5-year term on the U.S. Chemical Safety and Hazard Investigation Board (CSB), a board established under the Clean Air Act Amendments of 1990 to investigate chemical accidents at fixed facilities, an appointment that she received from President Clinton with confirmation by the U.S. Senate. Prior to the CSB, she worked as an industrial hygienist and occupa- tional health policy consultant for the United Auto ­Workers in Detroit, Michigan. Dr. Taylor serves as an executive board member of the American Public Health Association and as a member of the Beyond Pesticides/National Coalition against the Misuse of Pesticides Advisory Board. She formerly served as a member of the U.S. Presidential Advisory Committee on Gulf War Veterans’ Illnesses and as a health representative on the National Advisory Committee on Occupational Safety and Health (NACOSH). She has authored many publications, including articles that highlight minority workers, chemical safety, and disease and injury prevention. Dr. Taylor was selected by the MSU-SCHP students in 2007 and 2009 to receive the Golden Apple Award for excellence in teaching and advising. Her research interests are occupational and environmental health and safety interven- tions and policies, indoor air quality in public schools, minority workers, and the prevention of environmental exposure to pests and pesticides. Michael K. Lindell has a graduate degree in Social Psychology from the Univer- sity of Colorado (1975) with a specialty in disaster research and has completed hazardous materials emergency responder training through the Hazardous Mate­ rials Specialist level. Dr. Lindell has nearly 40 years of experience in the field of emergency management, during which time he has conducted 47 major research

The Use and Storage of Methyl Isocyanate (MIC) at Bayer CropScience Copyright National Academy of Sciences. All rights reserved. APPENDIX F 201 projects, many funded by the National Science Foundation, on the processes by which individuals and organizations respond to natural and technological hazards. In addition, he has had extensive experience in providing technical assistance to government agencies, industry groups, and private corporations in development of emergency plans and procedures. Professor Lindell organized and chaired an American Society of Civil Engineers Specialty Conference on Hazardous Facilities and served twice as Secretary of the Executive Commit- tee for the ASCE Council on Natural Disaster Reduction. He co-chaired the organizing committee for a conference on protective action decision making in nuclear power plant accidents and was a member of the steering committee for a similar conference on protective action decision making in chemical emergen- cies. He participated in NSF’s Second Assessment of Research and Applications on Natural Hazards, serving as a member of the committee on Preparedness and Response, and chairing the committee on Adoption, Implementation, and Evaluation of Hazard Adjustments. He has served on eight consultant panels for the International Atomic Energy Agency in developing planning guidance for response to nuclear and radiological incidents, has made presentations to five National Research Council panels, and served as a member of two National Research Council ­panels—Disasters Research in Social Sciences and Assessing Vulnerabilities Related to the Nation’s Chemical Infrastructure. Professor Lindell has made nearly 200 presentations before scientific societies and short courses for emergency planners, as well as being an invited participant in workshops on risk communication and emergency management in the United States and internationally. He has written extensively on emergency management and is the author of more than 80 technical reports, 100 journal articles and book chapters, and 10 books/monographs. The latter include a book on risk communication in multiethnic communities (Sage, 2004) and a textbook on community emergency planning (Wiley, 2007). Professor Lindell is currently a member of the federal Advisory Committee on Earthquake Hazards Reduction and is completing his term as editor of the International Journal of Mass Emergencies and Disasters. Jacqueline MacDonald Gibson is an assistant professor in the Department of Environmental Sciences and Engineering at the University of North Carolina, Chapel Hill. She conducts interdisciplinary research on the quantification of risks due to environmental contamination and on the quantitative comparison of policy options for controlling environmental risks. As an example, she is the principal investigator for a study to assess public health risks due to environmen- tal contamination in the United Arab Emirates and to develop a national strategy to reduce those risks. Dr. MacDonald Gibson earned a dual Ph.D. degree from the Department of Engineering and Public Policy and the Department of Civil and Environmental Engineering at Carnegie Mellon University in 2007. Prior to returning to school in 2003 to study for her Ph.D., she was a senior engineer at the RAND Corp. While at RAND, she served as liaison to the White House Office of

The Use and Storage of Methyl Isocyanate (MIC) at Bayer CropScience Copyright National Academy of Sciences. All rights reserved. 202 USE AND STORAGE OF METHYL ISOCYANATE (MIC) AT BAYER CROPSCIENCE Science and Technology Policy. She also previously was associate director of the Water Science and Technology Board, a unit of the National Research Council of the National Academy of Sciences. In those previous positions, she led a range of studies including assessment of options for improving potable water service to small U.S. communities, evaluation of regulatory requirements for the reme- diation of contaminated groundwater, assessment of research priorities for new environmental remediation technologies, evaluation of research on alternative methods for detecting and cleaning up landmines, and evaluation of risk assess- ment methods for sites contaminated with unexploded military ordnance. She has given briefings on these and other topics to a variety of federal officials, members of Congress and their staffs, and institutional advisory boards. Dr. MacDonald Gibson earned an M.S. degree from the Department of Civil and Environmental Engineering at the University of Illinois, Urbana-Champaign, and a B.A. in math- ematics from Bryn Mawr College. Jeffrey J. Siirola (NAE) is currently retired from the Eastman Chemical Com- pany where he was a technology fellow in Eastman Research in Kingsport, ­Tennessee. His areas of interest include chemical process synthesis, computer- aided conceptual process engineering, engineering design theory and meth- odology, chemical process development and technology assessment, resource conservation and recovery, sustainable development and growth, artificial intelli- gence, nonnumeric computer programming, and chemical engineering education. Dr. Siirola is secretary and a member of the Board of Directors of the Accredita- tion Board for Engineering and Technology. He is also a trustee and past president of CACHE (Computer Aids for Chemical Engineering Education), and a member of the American Chemical Society, the American Association for Artificial Intel- ligence, and the American Society for Engineering Education. He has served on numerous National Science Foundation and National Research Council panels, and on the advisory boards of several journals and chemical engineering depart- ments. Dr. Siirola is a member of the National Academy of Engineering and was the 2005 president of the American Institute of Chemical Engineers. He received a B.S. in chemical engineering from University of Utah in 1967 and a Ph.D. in chemical engineering from the University of Wisconsin-Madison in 1970.

The Use and Storage of Methyl Isocyanate (MIC) at Bayer CropScience Copyright National Academy of Sciences. All rights reserved. Appendix G Acronyms ACS American Chemical Society AHP Analytic Hierarchy Process AIChE The American Institute of Chemical Engineers ASCE Council on Natural Disaster Reduction BCA Benefit-Cost Analysis BC Hydro British Columbia Hydro and Power Authority CAAA U.S. Congress of the Clean Air Act Amendments CACHE Computer Aids for Chemical Engineering Education CalARP California Accidental Release Prevention CARPP California Accidental Release Prevention Program CCPS Center for Chemical Process Safety CEI Dow Chemical Exposure Index CFATS Department of Homeland Security’s Chemical Facility Anti- Terrorism Standards CLC The Institute Community Liaison Committee CMA Chemical Manufacturers Association COMAH Control of Major Accidents Hazards Regulation CPS Chemical Process Safety CSB U.S. Chemical Safety and Hazard Investigation Board CSR Corporate Social Responsibility DHS U.S. Department of Homeland Security DSPA New Jersey Domestic Security Preparedness Act 203

The Use and Storage of Methyl Isocyanate (MIC) at Bayer CropScience Copyright National Academy of Sciences. All rights reserved. 204 USE AND STORAGE OF METHYL ISOCYANATE (MIC) AT BAYER CROPSCIENCE DTSC California Department of Toxic Substances Control ECB European Chemicals Bureau ECC East Carbamoylation Complex EHS Environment, Health and Safety EP Emergency Preparedness EPA U.S. Environmental Protection Agency EPCRA Emergency Planning and Community Right-to-Know Act (also known as SARA Title III) ERPG Emergency Response Planning Guidelines ESF Engineering Safety Feature EU European Union F&EI Dow Fire and Explosion Index FMECA Fault Tree Analysis; Event Tree Analysis; and Failure Modes, Effects and Criticality Analysis HAZOP Hazard and Operability Analysis HCl Hydrogen Chloride HQI Health Quotient Index HSE Health and Safety Executive IBI Inherent Benign-ness Indicator ICI Imperial Chemical Industries ILO International Labor Organization INFORMS Institute for Operations Research and the Management Sciences INSET INherent SHE Evaluation Tool INSIDE INherent SHE [Safety, Health, Environment] In DEsign iRET Integrated Risk Estimation Tool ISD Inherently Safer Design I2SI Integrated Inherent Safety Index ISI Inherent Safety Index ISIM Inherent Safety Index Module ISL Inherent Safety Level ISO The Contra Costa Industrial Safety Ordinance ISP Inherently Safer Processes IST Inherently Safer Technology IUPAC Bureau of the International Union for Pure and Applied Chemistry KPEPC Kanawha/Putnam Local Emergency Planning Committee KPIs Key Performance Indicators KVEPC Kanawha Valley Emergency Planning Committee

The Use and Storage of Methyl Isocyanate (MIC) at Bayer CropScience Copyright National Academy of Sciences. All rights reserved. APPENDIX G 205 LEPC Local Emergency Planning Committees MAU Multi-Attribute Utility MAUT Multi-Attribute Utility Theory MCC N-Methyl Carbomoyl Chloride MIBK Methyl Isobutyl Ketone MIC Methyl isocyanate MMA Mono-Methylamine NACOSH National Advisory Committee on Occupational Safety and Health NAS National Academy of Sciences NCF Naphthylchloroformate NIST National Institute of Standards and Technology NIHHS Installation Handling Hazardous Substances Regulations NRC National Research Council NSF National Science Foundation OECD Organisation for Economic Cooperation and Development OHI Occupational Health Index OSHA United States, Occupational Safety and Health Administration PCMIC People Concerned about MIC PDCA Plan Do Check Act PFD Process Flow Diagram PHA Process Hazard Analysis PIIS Loughborough Prototype Index of Inherent Safety PPA Pollution Prevention Act PRI Process Route Index PRHI Process Route Healthiness Index PSAs Probabilistic Safety Analyses PSM Process Safety Management QAISP Qualitative Assessment for Inherently Safer Design REACH European Union’s Renewed European Policy for Chemicals RISO The City of Richmond’s Industrial Safety Ordinance RMP Risk Management Program SERC State Emergency Planning Committees SFK/TAA Major Accident Commission, Technical Committee for Plant Safety (Germany) SIS Safety Instrumented Systems

The Use and Storage of Methyl Isocyanate (MIC) at Bayer CropScience Copyright National Academy of Sciences. All rights reserved. 206 USE AND STORAGE OF METHYL ISOCYANATE (MIC) AT BAYER CROPSCIENCE SPI Safety Performance Indicator SREST Substance, Reactivity, Equipment, and Safety Technology TCPA Toxic Catastrophe Prevention Act TORCAT Toxic Release Consequence Analysis Tool TRI EPA’s Toxic Release Inventory UCC Union Carbide Corporation UCIL Union Carbide India Limited UNEP United Nations Environment Program VSL Value of a Statistical Life VZs Vulnerable Zones WCC West Carbamoylation Complex

FD06449 | 2012_美国_CSB_Chevron Richmond 炼油厂 火灾 - Chevron Richmond Refinery Fire__最终报告_2.pdf

分类:06_境外及港澳台调查报告 | 年份:2012 | 地域: | 严重程度: | 场所:化工/石化 | 起火原因: | 来源格式:pdf

19 potential worker fatalities, 6 injuries, 15,000 people sought medical treatment Oxygen source Ignition source People present “Hot Zone” not of sufficient size to protect personnel Released process fluid autoignited Leak in 4-Sidecut line 4-Sidecut piping component was extremely thin No formal method to communicate, implement, oversee and track to completion ETC findings and recommendations Line constructed of variable corrosion rate-prone carbon steel Turnaround team relied on inspection data Flammable material released PHYSICAL EVENTS AND CONDITIONS OUTCOME CHEVRON INDUSTRY CODES AND STANDARDS Increased sulfidation corrosion rates in low- silicon carbon steel Decision to remove insulation to identify leak location rather than shut down unit Essential process safety analyses not required by regulator No requirement for ALARP No Damage Mechanism Hazard Review performed Thorough safeguard evaluation not conducted in PHA Refer to Chevron Regulatory Report Refer to Chevron Interim Investigation Report Refer to Chevron Final Investigation Report LEGEND Chevron reliability programs not effective to implement ETC Sulfidation Failure Prevention Initiative No guiding emergency leak response protocol in place 100% component inspection not in Richmond Inspection Plan Consequences of potential damage mechanisms were not evaluated Unit metallurgists were not consulted Minimal industry emergency leak response protocol requirements Inconsistent API standards API does not require 100% component inspection Regulatory regime reactive and activity-based rather than goal-based Regulators had little input into safety precautions in the refinery. Assumption that non-inspected components were of sufficient thickness Important safety projects not brought to management rather than IMPACT team for approval if outside framing document requirements Requests for replacement or 100% inspection outside of framing document requirements Low-silicon component not inspected Inspection data did not indicate pipe was thin Risk of catastrophic failure not perceived by decision makers Trust in management Stop Work uncommon for shutting down plant “Stop Work” not called Past practice is to keep running with a small leak Recommendations to replace or 100% inpect 4-Sidecut line not implemented T-Min lowered so 4-sidecut could stay in operation Chevron did not use API 574 default values Chevron allowed inspector to lower alert thickness No MOC performed to evaluate risk of new T-Min Thorough inherently safer systems analysis not conducted in PHA Regulator does not require or oversee safety culture assessment follow-up action items

FD06450 | 2012_美国_Chevron Richmond 炼油厂 火灾 - Chevron Richmond Refinery Fire__最终报告.pdf

分类:06_境外及港澳台调查报告 | 年份:2012 | 地域: | 严重程度: | 场所:化工/石化 | 起火原因: | 来源格式:pdf

U.S. CHEMICAL SAFETY AND HAZARD INVESTIGATION BOARD

INTERIM INVESTIGATION REPORT

CHEVRON RICHMOND REFINERY FIRE

CHEVRON RICHMOND REFINERY RICHMOND, CALIFORNIA AUGUST 6, 2012 KEY ISSUES • INHERENTLY SAFER DESIGN • DAMAGE MECHANISM HAZARD REVIEW • EFFECTIVE ANALYSIS OF PROCESS SAFEGUARDS IN PROCESS HAZARD ANALYSIS

Chevron Richmond Refinery Interim Investigation Report April 2013

U.S. CHEMICAL SAFETY AND HAZARD INVESTIGATION BOARD

Chevron Richmond Refinery Interim Investigation Report April 2013

3 U.S. CHEMICAL SAFETY AND HAZARD INVESTIGATION BOARD

Summary On August 6, 2012, the Chevron U.S.A. Inc. Refinery in Richmond, California, experienced a catastrophic pipe failure in the #4 Crude Unit. The pipe ruptured, releasing flammable, hydrocarbon process fluid which partially vaporized into a large vapor cloud that engulfed nineteen Chevron employees. All of the employees escaped, narrowly avoiding serious injury. The flammable portion of the vapor cloud ignited just over two minutes after the pipe ruptured. The ignition and subsequent continued burning of the hydrocarbon process fluid resulted in a large plume of unknown and unquantified particulates and vapor traveling across the Richmond, California, area. In the weeks following the incident, approximately 15,000 people from the surrounding area sought medical treatment due to the release. Testing commissioned by the U.S. Chemical Safety and Hazard Investigation Board (CSB) and the California Division of Occupational Safety and Health (Cal/OSHA) determined that the pipe failed due to thinning caused by sulfidation corrosion, a common damage mechanism in refineries. As a result of the incident, the Chevron Richmond Refinery crude unit remains out of commission over eight months later. In addition, Cal/OSHA issued the refinery 17 citations related to the incident and eight additional citations, with a total proposed fine of nearly one million dollars. In this interim report, the CSB is issuing recommendations to Chevron, the City of Richmond, Contra Costa County, Cal/OSHA, the State of California, and the U.S. Environmental Protection Agency, addressing the need for inherently safer design, rigorous and documented damage mechanism hazard reviews, and thorough analyses of process safeguards. This interim investigation report contains detailed analyses of and makes recommendations to Chevron and regulatory bodies at the local, state, and federal level. The CSB believes the findings and recommendations presented in this report can be applied to refineries, chemical plants, and other industries nationwide to improve process safety. The CSB plans to release a comprehensive Final Investigation Report later in 2013 that will include analyses and recommendations relating to technical and regulatory investigation findings which are not included in this interim report. The Final Investigation Report will cover topics including: the importance of having a competent, well-funded regulator and an adaptable regulatory regime; Chevron safety culture; process safety indicator data collection and reporting; emergency planning and response; stop work authority; and recommendations for improvement of petroleum industry standards and recommended practices. Some of these issues are previewed at the end of this interim report under Additional Issues Currently Under Investigation.

Chevron Richmond Refinery Interim Investigation Report April 2013

4 U.S. CHEMICAL SAFETY AND HAZARD INVESTIGATION BOARD

Table of Contents Figures ........................................................................................................................ 5 Acronyms and Abbreviations .................................................................................... 6 Background and Findings .......................................................................................... 8 Sulfidation Corrosion ...............................................................................................16 Sulfidation Corrosion Inspection Techniques ..........................................................21 Chevron Sulfidation Corrosion Knowledge and Expertise .....................................24 Other Significant Sulfidation Occurrences ..............................................................27 Process Hazard Analysis ..........................................................................................31 Operational Changes ................................................................................................33 Chevron Sulfidation Corrosion Inspection and Mitigation .....................................36 Inherently Safer Systems .........................................................................................40 Regulatory Oversight ...............................................................................................46 Recommendations ....................................................................................................53 Additional Issues Currently Under Investigation ....................................................59 Regulatory Oversight ............................................................................................59 Emergency Planning and Reporting .....................................................................61 Emergency Response ............................................................................................62 Safety Culture .......................................................................................................62 References ................................................................................................................65

Chevron Richmond Refinery Interim Investigation Report April 2013

5 U.S. CHEMICAL SAFETY AND HAZARD INVESTIGATION BOARD Figures Figure 1. The burned remains of the fire truck that was consumed by the fire.

............................................ 9 Figure 2. Vapor cloud over Richmond area and smoke from Chevron Richmond Refinery fire

............... 10 Figure 3. Initial vapor cloud formation and subsequent ignition

................................................................ 11 Figure 4. C-1100 Crude Unit Atmospheric Column and Upstream Process Equipment

............................ 12 Figure 5. Overhead view of the equipment in the #4 Crude Unit

............................................................... 13 Figure 6. 4-sidecut line configuration……………………………………………………………...……..14 Figure 7. Photo of rupture on 4-sidecut 52-inch component

...................................................................... 15 Figure 8. Graph showing how corrosion rates increase in carbon steel.

..................................................... 18 Figure 9. 4-sidecut piping sample

.............................................................................................................. 20 Figure 10. Modified McConomy Curves from API RP 939-C

................................................................... 23 Figure 11. Chevron’s key sulfidation events between 1974 and 2013.

...................................................... 24 Figure 12. Schematic of failed piping from the Chevron Salt Lake Refinery.

........................................... 28 Figure 13. Failed piping component that resulted in the 2007 Richmond crude unit fire.

.......................... 29 Figure 14. Percentage increase of the sulfur content in the 4-sidecut.

........................................................ 34 Figure 15. Key events at the Richmond refinery between 1998 and 2013.

................................................ 36 Figure 16. Hierarchy of controls.

................................................................................................................ 41

Chevron Richmond Refinery Interim Investigation Report April 2013

6 U.S. CHEMICAL SAFETY AND HAZARD INVESTIGATION BOARD Acronyms and Abbreviations ALARP As Low As Reasonably Practicable API

American Petroleum Institute ASTM American Society for Testing and Materials BIN

Business Improvement Network bpd

Barrels Per Day BPTC BP Texas City CAA

Clean Air Act Cal/OSHA California Division of Occupational Safety and Health CCPS Center for Chemical Process Safety CCR California Code of Regulations Chevron ETC Chevron Energy Technology Company CML

Condition Monitoring Locations CSB

U.S. Chemical Safety and Hazard Investigation Board CSHO Compliance Safety and Health Officer CWS

Community Warning System EPA

Environmental Protection Agency °F

degree Fahrenheit HSE

Health and Safety Executive ISO

Industrial Safety Ordinance ISS

Inherently Safer Systems IST

Inherently Safer Technology KPI

Key Process Indicator

Chevron Richmond Refinery Interim Investigation Report April 2013

7 U.S. CHEMICAL SAFETY AND HAZARD INVESTIGATION BOARD LEPC Local Emergency Planning Committee LOPA Layers of Protection Analysis MOC Management of Change NEP

National Emphasis Program OEM U.S. EPA Office of Emergency Management OSHA Occupational Safety and Health Administration P&P

Policy and Procedures PHA

Process Hazard Analysis PMI

Positive Materials Identification psig

Pounds Per Square Inch Gauge PSM

Process Safety Management RISO City of Richmond Industrial Safety Ordinance RLOP Richmond Lube Oil Project RMP

Risk Management Plan SIP

Shelter-In-Place TML

Thickness Monitoring Location UK

United Kingdom USW United Steelworker International Union wt. % Weight Percent

Chevron Richmond Refinery Interim Investigation Report April 2013

8 U.S. CHEMICAL SAFETY AND HAZARD INVESTIGATION BOARD Background and Findings

  1. On August 6, 2012, the Chevron U.S.A. Inc. Refinery in Richmond, California (Chevron

Richmond Refinery), experienced a catastrophic pipe rupture in the #4 Crude Unit (crude unit). The ruptured pipe released a flammable hydrocarbon process fluid which then partially vaporized into a large vapor cloud that engulfed nineteen Chevron U.S.A. Inc. (Chevron) employees. At 6:33 pm, approximately two minutes after the release, the flammable portion of the vapor cloud ignited.i

i Surveillance footage provided by Chevron. Chevron clarified to CSB that video time is approximately 5 minutes out of sync. The video can be found at Eighteen of the employees safely escaped from the cloud just before ignition; one employee, a firefighter, was inside a fire engine that caught fire when the vapor cloud ignited (Figure 1). Because he was wearing full body fire-fighting protective equipment, he was able to make his way to safety. Six Chevron employees suffered minor injuries during the incident and subsequent emergency response efforts. http://www.csb.gov/videoroom/detail.aspx?VID=69 (accessed February 8, 2013).

Chevron Richmond Refinery Interim Investigation Report April 2013

9 U.S. CHEMICAL SAFETY AND HAZARD INVESTIGATION BOARD

Figure 1. The burned remains of the fire truck that was consumed by the fire. A firefighter was in the cab when the vapor cloud ignited. The fire truck was positioned approximately 65 feet from the leak location.

Chevron Richmond Refinery Interim Investigation Report April 2013

10 U.S. CHEMICAL SAFETY AND HAZARD INVESTIGATION BOARD

large plume of unknown and unquantified particulates and vapor traveling across the Richmond, California, area (Figures 2 and 3). This resulted in a Community Warning System (CWS) Level 3 alert,i and a shelter-in-placeii (SIP) was issued at 6:38 pm1 for the cities of Richmond, San Pablo, and North Richmond. It was lifted later that night at 11:12 pm after the fire was fully under control. In the weeks following the incident, nearby medical facilities received over 15,000 members of the public seeking treatment for ailments including breathing problems, chest pain, shortness of breath, sore throat, and headaches. Approximately 20 people were admitted to local hospitals as inpatients for treatment. Figure 2. Vapor cloud (white) over Richmond area and smoke (black) from Chevron Richmond Refinery fire as seen from San Rafael in Marin County.2

i A Community Warning System Level 3 alert indicates that a facility within Contra Costa County has had a release that has offsite impact and is categorized by any of the following:

mutual aid is requested to mitigate the event and the fire will last longer than 15 minutes.

consultation with the Contra Costa Health Services Hazardous Material Incident Response Team, requests that sirens should be sounded. See http://cchealth.org/hazmat/pdf/incident_notification_policy.pdf (accessed April 9, 2013). ii Contra Costa County considers a shelter-in-place to include going inside a home or nearest building, closing doors and windows, and turning off heating, ventilation, and air conditioning. See http://cchealth.org/emergencies/shelter- in-place.php (accessed February 6, 2013). Chevron Richmond Refinery Interim Investigation Report April 2013

11 U.S. CHEMICAL SAFETY AND HAZARD INVESTIGATION BOARD

Figure 3. Initial vapor cloud formation (white cloud) and subsequent ignition (black smoke) as seen from a pier in San Francisco, California.

  1. The incident occurred from the piping referred to as the “4-sidecut” stream, one of several

process streams exiting the C-1100 Crude Unit Atmospheric Column (Figure 4).i A plot plan of the crude unit shows the leak location relative to C-1100 (Figure 5). As shown in Figure 6, light gas oil (the crude unit 4-sidecut process fluid) exits the atmospheric column via a 20-inch nozzle and is split into a 12-inch line and an 8-inch line. The August 6, 2012, pipe rupture (Figure 7) occurred on a 52-inch long componentii of the 4-sidecut 8-inch line (the 52-inch component). The line operated at a temperature of 640 degrees Fahrenheit (°F)iii

i The atmospheric column separates crude oil feed into different streams through distillation. These streams are further processed in other units in the refinery. and had an operating pressure of approximately 55 pounds per square inch gauge (psig) at the rupture location. At the ii The term “component” refers to a portion of piping between welds or flanges. It includes straight run piping and pipe fittings. iii The auto-ignition temperature for this process, the temperature at which a material will combust in the presence of sufficient oxygen without an ignition source, was also 640 °F. This number is based on the Chevron Light Gas Oil Material Safety Data Sheet. Chemical testing of 4-sidecut samples following the incident indicated lower auto- ignition temperatures; however, these samples may not have been representative of typical 4-sidecut process fluid.

Chevron Richmond Refinery Interim Investigation Report April 2013

12 U.S. CHEMICAL SAFETY AND HAZARD INVESTIGATION BOARD time of the incident, light gas oil was flowing through the 8-inch line at a rate of approximately 10,800 barrels per day (bpd).i

Figure 4. C-1100 Crude Unit Atmospheric Column and Upstream Process Equipment.

i This is the equivalent of 315 gallons per minute (gpm). A barrel equals 42 gallons.

Chevron Richmond Refinery Interim Investigation Report April 2013

13 U.S. CHEMICAL SAFETY AND HAZARD INVESTIGATION BOARD

Figure 5. Overhead view of the equipment in the #4 Crude Unit showing the leak location, commonly referred to as a plot plan.

Chevron Richmond Refinery Interim Investigation Report April 2013

14 U.S. CHEMICAL SAFETY AND HAZARD INVESTIGATION BOARD

Figure 6. 4-sidecut line configuration and rupture location.

8-inch 4-sidecut line 12-inch 4-sidecut line 52-inch component Rupture Location

Chevron Richmond Refinery Interim Investigation Report April 2013

15 U.S. CHEMICAL SAFETY AND HAZARD INVESTIGATION BOARD

  1. The CSB commissioned Anamet, Inc., a materials engineering and laboratory testing company,

to conduct testing of the 4-sidecut pipe, including the failed 52-inch component. The testing concluded that the rupture was due to pipe wall thinning caused by sulfidation corrosion,3

  1. Anamet’s metallurgical analysis found that the 52-inch component where the rupture occurred

had experienced extreme thinning; the average wall thickness near the rupture location was approximately 40 percent thinner than a dime which is discussed below. i (the thinnest American coin). Between 1976 and 2012, the 52-inch piping component had lost, on average, 90 percent of its original wall thickness in the area near the rupture. The piping had an initial nominal wall thickness of 0.322- inchii

when it was installed in 1976. Figure 7. Photo of rupture on 4-sidecut 52-inch component.

i The U.S. Mint reports that a dime has a thickness of 1.35 mm, or 0.053 inches. Information can be found at http://www.usmint.gov/about_the_mint/?action=coin_specifications (accessed February 14, 2013). ii This portion of the 4-sidecut line was constructed of 8-inch Schedule 40 carbon steel piping.

Chevron Richmond Refinery Interim Investigation Report April 2013

16 U.S. CHEMICAL SAFETY AND HAZARD INVESTIGATION BOARD Sulfidation Corrosion

  1. Sulfidation corrosion is a damage mechanismi that is well understood in the refining industry.

The sulfidation corrosion industry guidance document, American Petroleum Institute (API) Recommended Practice (RP) 939-C Guidelines for Avoiding Sulfidation (Sulfidic) Corrosion Failures in Oil Refineriesii [Sulfidation] …is not a new phenomenon, but was first observed in the late 1800s in a pipe still (crude separation) unit, due to the naturally occurring sulfur compounds found in crude oil. When heated for separation, the various fractions in the crude were found to contain sulfur compounds that corroded the steel equipment. notes: 4

  1. Sulfidation corrosion, also known as sulfidic corrosion,

5 is a damage mechanism that causes thinning in iron-containing materials, such as steel, due to the reaction between sulfur compounds and iron at temperatures ranging from 450 °F to 800 °F.6 This damage mechanism causes pipe walls to gradually thin over time. Sulfidation corrosion is common in crude oil distillationiii where naturally occurring sulfur and sulfur compounds found in crude oil feed, such as hydrogen sulfide,iv

  1. The reaction between sulfur and iron produces a layer of iron sulfide scale

are available to react with steel piping and equipment. Process variables that affect corrosion rates include the total sulfur content of the oil, the sulfur species present, flow conditions, and the temperature of the system. Virtually all crude oil feeds contain sulfur compounds and, as a result, sulfidation corrosion is a damage mechanism present at every refinery that processes crude oil. Sulfidation corrosion can cause thinning to the point of pipe failure when not properly monitored and controlled. v on the inside surface of piping.7

i Piping damage mechanisms are any type of deterioration encountered in the refining and chemical process industry that can result in flaws/defects that can affect the integrity of piping (e.g. corrosion, cracking, erosion, dents, and other mechanical, physical or chemical impacts). See API 570. "Piping Inspection Code: In-Service Inspection, Rating, Repair, and Alteration of Piping Systems." 3rd ed., Section 3.1.1.5, November 2009. This reaction can be compared to that of oxygen and iron which also produces a scale, commonly known as rust. The type of scale formed by sulfidation corrosion is dependent upon the components contained in the steel. Certain scales formed are protective and actually reduce the reaction rate between sulfur compounds and iron, minimizing sulfidation corrosion ii API RP 939-C is one of several relevant American Petroleum Institute recommended practices and standards under evaluation by the CSB as part of this investigation. To the casual observer API RP 939-C appears to obligate the industry to take significant actions. However, the CSB concluded it was written to be permissive so that industry compliance with specific provisions would not be required. The complete findings from this evaluation will be included in the CSB’s Final Report. iii Distillation separates mixtures into broad categories of its components by heating the mixture in a distillation column where different products boil off and are recovered at different temperatures. See http://www.eia.gov/todayinenergy/detail.cfm?id=6970 (accessed April 4, 2013). iv Hydrogen sulfide is the most aggressive sulfur compound that causes sulfidation corrosion. v Scale is a nonmetallic layer on the surface of metals and is often a result of corrosion.

Chevron Richmond Refinery Interim Investigation Report April 2013

17 U.S. CHEMICAL SAFETY AND HAZARD INVESTIGATION BOARD rates. For instance, sulfidation corrosion affecting steel alloys containing greater than two weight percent (wt. %) chromium produces a protective scale that inhibits the reaction between the iron and sulfur compounds, thereby reducing corrosion rates.i With increasing percentages of chromium, the reaction is further slowed, greatly diminishing corrosion rates.8,ii For example, stainless steel (an 18 wt. % chromium alloy) is nearly 15 times more resistant to sulfidation corrosion than 9-Chrome (a 9 wt. % chromium alloy).9 Conversely, sulfidation corrosion rates are significantly higher in steels containing very little chromium. Carbon steel, the Chevron 4- sidecut line material of construction, was manufactured with a maximum concentration of 0.40 % chromium.10 The scale formed on carbon steel is less protective and allows continued reaction between the sulfur compounds and iron.11

  1. In addition to its inherently faster rate of sulfidation corrosion when compared with higher

chromium steels, carbon steel also experiences significant variation in corrosion rates due to variances in silicon content, a component used in the steel manufacturing process. Carbon steel piping containing silicon content less than 0.10 wt. % can corrode at accelerated rates, Thus, carbon steel corrodes at a rate that is significantly faster than other materials of construction, such as high chromium steels. 12

i At greater than two wt. % chromium, sulfur compounds react with the steel to form FeCr2S4 scale. This scale provides more protection than the FeS scale that forms on carbon steel piping. See Niccolls, E. H., J. M. Stankiewicz, J. E. McLaughlin, and K. Yamamoto. "High Temperature Sulfidation Corrosion in Refining." 17th International Corrosion Congress. Las Vegas: NACE International, 2008. up to sixteen times faster than carbon steel piping containing higher percentages of silicon as shown in Figure 8. This figure shows how carbon steel corrosion rates can greatly vary depending on silicon content. ii It has also been found that chromium “poisons” the decomposition of sulfur compounds to hydrogen sulfide which also slows down the sulfidation corrosion rate. See Couper, A.S. “High Temperature Mercaptan Corrosion of Steels.” 19th Annual Conference of the National Association of Corrosion Engineers. Pages 396t-401t, New York: March 1963.

Chevron Richmond Refinery Interim Investigation Report April 2013

18 U.S. CHEMICAL SAFETY AND HAZARD INVESTIGATION BOARD

Figure 8. This graph shows how corrosion rates increase in carbon steel containing decreasing percentages of silicon. This information can be found in Annex C of API RP 939- C.i

  1. The refining industry has been aware of increased rates of sulfidation corrosion in low-silicon

carbon steel piping since as early as 1974,

13 Sulfidation corrosion has caused severe fires and fatalities in the refining industry, primarily because it causes corrosion over a relatively large area, so failures tend to involve ruptures or large leaks rather than pinhole leaks. It can be insidious in that moderately high corrosion rates can go undetected for years before failure. Finally, process changes that increase the temperature or sulfur content can creep up over time and nearly 40 years before the August 6, 2012, incident and two years before the Chevron crude unit was constructed. Prior to the incident, Chevron documented its understanding of the significant consequences of sulfidation corrosion. This is reflected in Chevron’s Corrosion Prevention and Metallurgy Manual, which states:

i The y-axis of this figure is in units of mils per year (mpy). A “mil” is 1/1000 inch. Silicon Content (Weight %)

Chevron Richmond Refinery Interim Investigation Report April 2013

19 U.S. CHEMICAL SAFETY AND HAZARD INVESTIGATION BOARD multiply corrosion rates so that what was thought to be a low corrosion rate system becomes corrosive enough to fail before the increased corrosion rate is recognized.

  1. Carbon steel piping is manufactured to meet certain specifications, including American Society

for Testing and Materials (ASTM) A53B,14 ASTM A106,15 and API 5L.16 ASTM A53B and API 5L do not contain minimum silicon content requirements for carbon steel piping,17

  1. In the mid 1980s, pipe manufacturers began to simultaneously comply with all three

manufacturing specifications (ASTM A53B, ASTM A106, and API 5L) when manufacturing carbon steel piping. The majority of carbon steel piping purchased following this time period likely has a minimum of 0.10 wt. % silicon content. However, piping purchased and installed prior to the mid-1980s could still contain low silicon components that are susceptible to high, variable sulfidation corrosion rates. while ASTM A106 requires the piping to be manufactured with a minimum silicon content of 0.10 wt. %. As a result, manufacturers have used different levels of silicon in the carbon steel pipe manufacturing process. Thus, depending on the manufacturing specification for carbon steel susceptible to sulfidation corrosion, corrosion rates could vary depending on the silicon content within the steel.

  1. Over 95 percent of the 144 refineries in operation in the U.S., including the Chevron Richmond

Refinery,i were built before 1985,18

  1. The Chevron Richmond Refinery 4-sidecut piping circuit containing the 52-inch component that

failed was constructed of ASTM A53B carbon steel, which had no minimum specification for silicon content. Post-incident testing of samples of the 4-sidecut piping from the Chevron Richmond Refinery identified silicon content ranging from 0.01 wt. % to 0.2 wt. %. Of twelve samples taken from the 8-inch and 12-inch 4-sidecut line, six had a silicon concentration of less than 0.10 wt. %. The 52-inch pipe component that ruptured on the day of the incident had a silicon content of only 0.01 wt. %. The elbow component directly upstream of the 52-inch component that failed had a silicon concentration of 0.16 wt. % and showed considerably less thinning (Figure 9). and thus before piping manufacturers began producing carbon steel in compliance with all three manufacturing specifications. Therefore, the original carbon steel piping in these refineries is likely to contain varying percentages of silicon content and may experience highly variable sulfidation corrosion rates.

i The Chevron Richmond Refinery was constructed in 1902.

Chevron Richmond Refinery Interim Investigation Report April 2013

20 U.S. CHEMICAL SAFETY AND HAZARD INVESTIGATION BOARD

Figure 9. 4-sidecut piping sample (E-017-8) analyzed by Anamet Labs showing the relative thickness of low silicon piping on the left and the high silicon piping on the right. The ruptured pipe component (left) contained 0.01 % silicon and the upstream elbow component (right) contained 0.16 % silicon.19

The initial nominal thickness of this piping was 0.322- inch.

Chevron Richmond Refinery Interim Investigation Report April 2013

21 U.S. CHEMICAL SAFETY AND HAZARD INVESTIGATION BOARD Sulfidation Corrosion Inspection Techniques

  1. As evidenced by the chemical analysis performed on the Chevron 4-sidecut piping post-incident,

carbon steel piping components within a single circuiti can contain varying percentages of silicon, resulting in a large variation in sulfidation corrosion rates by component. Historically, sulfidation corrosion monitoring techniques required the measurement of pipe thickness at only a minimal number of permanent Condition Monitoring Locations (CMLs)ii along the piping. These CMLs are most frequently placed on elbows and fittings.iii However, due to details of the manufacturing process, carbon steel pipe fittings generally contain high percentages of silicon.20 When measurements are only taken at high-silicon containing fittings, the measurements can fail to identify high corrosion rates within a pipe circuit caused by low-silicon components. At the Chevron Richmond Refinery, the 4-sidecut piping had a total of 24 CMLsiv

  1. Determining silicon content in existing carbon steel piping and equipment in the field is a

difficult undertaking. To properly characterize the silicon content in each component in a piping circuit, every component must be inspected. This is known as 100 percent component inspection. Two techniques are currently used to determine silicon content in existing carbon steel piping circuits with unknown chemical composition: performing chemical analysis and pipe wall thickness measurements of every component. on piping and fittings. The CSB found that there were no CMLs placed on the low silicon piping component that failed. Chevron identified accelerated corrosion in the 52-inch component in a 2002 inspection. However, no CML was added to ensure future monitoring, and the 52-inch component was not inspected again. Instead, the CSB found that Chevron relied on inspection data gained primarily from high silicon pipe-fitting components, such as elbow components. This inspection data did not reflect the corrosion rates of the lower-silicon components of the 4- sidecut piping. Relying on the limited inspection data from the CMLs on the high silicon components, Chevron management denied multiple recommendations to replace the 4-sidecut line. As illustrated by the Chevron incident, inspection techniques alone may not accurately identify the most aggressive corrosion rates throughout an entire circuit of carbon steel piping. Low-silicon components can remain uninspected and unidentified until failures such as the August 6, 2012, Chevron incident occur. As will be discussed below, upgrading metallurgy is a more effective means of managing sulfidation corrosion.

i A piping circuit is a length of pipe and the fittings associated with a particular process service that operate at similar conditions. A circuit usually begins and ends at either a branch or a piece of process equipment such as a vessel or a pump. Reference to piping by circuits allows piping to be grouped conveniently by proximity and operating service. Piping circuits may also be referred to as piping runs. ii A condition monitoring location (CML) is a designated area where periodic thickness examinations are conducted. Each CML represents as many as four inspection locations located circumferentially around the pipe. CMLs are also referred to as thickness monitoring locations (TMLs). CML was historically referred to as corrosion monitoring locations (CMLs) and that terminology is sometimes still used within the industry. iii A fitting is a piping component usually associated with a change in direction or diameter. iv Many of these CMLs were added during the 2011 turnaround.

Chevron Richmond Refinery Interim Investigation Report April 2013

22 U.S. CHEMICAL SAFETY AND HAZARD INVESTIGATION BOARD

  1. Many field-portable instruments used for positive material identification cannot adequately

identify silicon content.21 If original manufacturing quality assurance datai are not available, as is generally the case with older plants, then chemical verification requires destructive testing. Metal shavings must be taken from each carbon steel piping component for chemical analysis in a laboratory.22

  1. Carbon steel components containing low concentrations of silicon can also potentially be

identified by performing thickness measurements of every component within a carbon steel circuit. This method requires that the insulation be removed for access to the piping so that each individual piping component can be sampled and verified. 23 This practice is only useful if the piping circuit has been exposed to sulfidation corrosion for a long enough time period so that variances in corrosion rate caused by differences in silicon content may be detected. Chemical analysis is therefore the most accurate technique to identify low-silicon carbon steel components. As with chemical analysis, the thickness measurement method requires that each individual piping component be identified by removing insulation (so every weld seam can be located), a time consuming and costly undertaking, or by using non-destructive examination techniques. Thickness measurements on high temperature piping typically can only be done accurately and safely during unit turnarounds.ii

  1. API Recommended Practice 939-C Guidelines for Avoiding Sulfidation (Sulfidic) Corrosion

Failures in Oil Refineries describes the challenges faced when attempting to thoroughly inspect carbon steel lines susceptible to sulfidation corrosion. The recommended practice states that older ASTM A53 piping, such as the Chevron piping that failed on August 6th, creates a “major inspection challenge” Although these various methods were available to detect the location of the field welds, Chevron had not used them to identify the 4-sidecut pipe segment locations. 24 and that “unless the refinery is fortunate enough to have located an inspection point on that particular [low silicon] section of pipe or fitting, it is very difficult to detect the thinning component.”25 It states that in some applications, carbon steel will appear to be adequate based on measured corrosion rates until failure occurs at some undocumented or unidentified low-silicon component.26

  1. Unlike silicon concentration, the chromium concentration of steel can easily be verified in the

field using portable positive material identification instruments. In addition, steel alloys containing at least 9 wt. % chromium are more resistant to sulfidation corrosion and do not run the risk of extreme variations in corrosion rates within components in the same piping circuit.

iii

i Manufacturing quality assurance data, also known as mill data, provides the chemical composition of the steel.

This makes alloys with higher chromium content an inherently safer choice in high temperature ii A “turnaround” is a scheduled shutdown of a process unit to perform maintenance, repairs, upgrades, and inspection of process equipment. iii The protective scale, FeCr2S4, begins to be the dominant scale formed in steels containing a chromium content of five wt. %. The 5Cr steel alloy can be manufactured to contain anywhere from 4% to 6% chromium. Thus, “the sulfidation corrosion rate can vary dramatically in 5Cr steels even in the same operating environment.” See Niccolls, E. H., J. M. Stankiewicz, J. E. McLaughlin, and K. Yamamoto. "High Temperature Sulfidation Corrosion in Refining." 17th International Corrosion Congress. Las Vegas: NACE International, 2008.

Chevron Richmond Refinery Interim Investigation Report April 2013

23 U.S. CHEMICAL SAFETY AND HAZARD INVESTIGATION BOARD sulfidation corrosion environments.i As shown in the Modified McConomy Curvesii from API RP 939-C (Figure 10), 9-Chromeiii corrodes 15 times faster than stainless steel,iv and carbon steelv corrodes 125 times faster than stainless steel.27

Figure 10. Modified McConomy Curves from API RP 939-C.

i Steels with higher chromium content are inherently safer than carbon steel with respect to sulfidation corrosion. However, analysis is still required to ensure that the best material of construction is selected. ii Modified McConomy Curves are the set of curves API RP 939-C uses to predict sulfidation corrosion rates versus temperature for several steel alloys. iii 9-Chrome contains 9 wt. % chromium. iv Stainless steel contains 18 wt. % chromium. v ASTM A53B carbon steel contains a maximum of 0.40 wt. % chromium. 100.0

Chevron Richmond Refinery Interim Investigation Report April 2013

24 U.S. CHEMICAL SAFETY AND HAZARD INVESTIGATION BOARD Chevron Sulfidation Corrosion Knowledge and Expertise

  1. Figure 11 shows a timeline of Chevron’s key sulfidation events. Chevron technical staff has

considerable knowledge and expertise regarding sulfidation corrosion, specifically with respect to corrosion rate variations caused by differing silicon concentration in carbon steel piping. Chevron employees have authored industry papers on sulfidation corrosion and had significant influence in the development of the industry sulfidation corrosion recommended practice, API RP 939-C. This recommended practice, first published in 2009, was developed under Chevron leadership. At the approximate time of publication of API RP 939-C, Chevron Energy Technology Company (Chevron ETC)i

created an internal document on the subject of sulfidation corrosion. Chevron ETC metallurgists released a formal report dated September 30, 2009 (nearly 3 years prior to the incident) to Chevron refinery-based reliability managers and chief inspectors entitled Updated Inspection Strategies for Preventing Sulfidation Corrosion Failures in Chevron Refineries. Figure 11. Chevron’s key sulfidation events between 1974 and 2013.

i The Chevron Energy Technology Company is a separate business unit within the Chevron Corporation that provides technology solutions and technical expertise for Chevron operations worldwide. See http://richmond.chevron.com/home/aboutchevronrichmond.aspx (accessed April 4, 2013)

Chevron Richmond Refinery Interim Investigation Report April 2013

25 U.S. CHEMICAL SAFETY AND HAZARD INVESTIGATION BOARD

  1. Sulfidation experts acknowledged in the Chevron ETC report that, “Until now, Chevron has not

directly addressed the risk of low Si[licon] carbon steel…”i Sulfidation corrosion failures are not common in Chevron or in the industry but they are of great concern because of the comparatively high likelihood of blowout or catastrophic failure […] . This can happen because corrosion occurs at a relatively uniform rate over a broad area so a pipe can get progressively thinner until it actually bursts rather than leaking at a pit or local thin area. In addition the process fluid is often above its autoignition temperature. The combination of these factors means that sulfidation corrosion failures frequently result in large fires. […] [S]everal case histories of sulfidation corrosion failures that have occurred in Chevron or in the industry several of which are blowouts. and that the report lays out a program that “seeks to close these gaps, and to maximize the effectiveness of our inspection.” The report clearly indicates that Chevron understood both the potential consequence and the high likelihood of a rupture or catastrophic failure from sulfidation corrosion and calls out Chevron’s need for action: This Chevron ETC report specifically recommends that inspectors perform 100 percent component inspection on high temperature carbon steel piping susceptible to sulfidation corrosion. However, this 100 percent component inspection program was not implemented at the Richmond refinery prior to the August 6, 2012 incident. The Chevron ETC report defines a priority ranking system to help focus the inspection implementation efforts. The process conditions of the 4-sidecut stream placed it in the highest priority for inspection.

  1. Chevron ETC technical experts issued a corporate newsletter in 2010 that again warned of the

potential consequence of sulfidation failures. In this newsletter, the 100 percent component inspection recommendation from the 2009 report was reiterated for piping systems such as the crude unit 4-sidecut piping. The newsletter states: Sulfidation corrosion failures … are of great concern because of the comparatively high likelihood of “blowout” or catastrophic failure. This typically happens because corrosion occurs at a relatively uniform rate over a broad area, so a pipe can get progressively thinner until it actually bursts rather than leaking at a pit or local thin area. In addition, the process fluid is often above its autoignition temperature. The combination of these factors means that sulfidation corrosion failures frequently result in large fires. Chevron and the industry have experienced numerous failures from this mechanism and recent incidents have reinforced the need for revised inspection strategies and a robust PMI (Positive Materials Identification) program.

i A 2003 corporate technical newsletter recommended 100 percent component inspection of carbon steel piping susceptible to sulfidation corrosion following a 2002 Chevron Salt Lake City sulfidation corrosion incident.

Chevron Richmond Refinery Interim Investigation Report April 2013

26 U.S. CHEMICAL SAFETY AND HAZARD INVESTIGATION BOARD The Chevron ETC 100 percent component inspection recommendation for high risk piping systems, established in 2009, was not implemented at Richmond; therefore, the thin-walled low silicon 4- sidecut piping component remained in service until it catastrophically failed on August 6, 2012.

  1. Chevron and Chevron ETC metallurgists, materials engineers, and piping inspectors had expertise

regarding sulfidation corrosion. They educated personnel and advocated for identification and control of damage mechanisms, including sulfidation corrosion. However, they had limited practical influence to implement their recommendations. These individuals did not participate in the crude unit Process Hazard Analysis (PHA)i and did not affect decisions concerning control of sulfidation corrosion during the crude unit turnaround process.ii

i A process hazard analysis is a hazard evaluation to identify, evaluate, and control the hazards involved in a process. Facilities that process a threshold quantity of hazardous materials, such as the Chevron Richmond refinery, are required to conduct a process hazard analysis per the California Code of Regulations Title 8 Section 5189. Process Safety Management of Acutely Hazardous Materials (1992). PHAs are also required by the California Accidental Release Prevention Program and the federal EPA Risk Management Program.

ii The turnaround process includes both the planning stage prior to the shutdown and the activities staged during the shutdown.

Chevron Richmond Refinery Interim Investigation Report April 2013

27 U.S. CHEMICAL SAFETY AND HAZARD INVESTIGATION BOARD Other Significant Sulfidation Occurrences

  1. The refining industry has experienced numerous sulfidation corrosion failures, primarily in

piping.28 API RP 939-C identifies 45 sulfidation corrosion failures, one third of which were found to have occurred in carbon steel piping containing low levels of silicon.29

  1. The August 6, 2012, Chevron Richmond Refinery 4-sidecut pipe rupture was not the first

sulfidation corrosion-related incident to occur at a Chevron refinery. In 1988, a low silicon carbon steel (0.02 wt. % silicon) piping component failed at the Chevron’s former El Paso Refinery

i

  1. In 2002, the Chevron Salt Lake City Refinery experienced a fire when process piping failed as a

result of sulfidation corrosion in a low silicon ASTM A53 carbon steel piping component. Chevron communicated the incident throughout the company in a technical newsletter. Chevron experts found that despite regular monitoring of the line for 30 years in compliance with industry standards, their inspection program failed to prevent the failure. Corrosion rates at the unmonitored failure location were found to be five times greater than corrosion rates at the monitored piping locations. The monitored locations were constructed of high silicon ASTM A106 piping (Figure 12). Chevron also found that in the years preceding the failure, both the temperature in El Paso, Texas. In addition, two sulfidation corrosion incidents occurred at the Chevron Pascagoula refinery in Pascagoula, Mississippi: one in 1993 and one in 1988 on a low- silicon carbon steel component. ii

i The El Paso Refinery is now owned by Western Refining. and hydrogen sulfide concentration in the process had been increasing. Each of these factors increased corrosion rates and contributed to the failure. In 2003, following this incident, Chevron experts recommended that refineries inspect every piping component (100 % component inspection) in all high-risk piping systems: those operating above 550 °F and containing hydrogen sulfide. ii The temperature in the line had been increased by over 170 °F throughout the life of the unit. During the two years prior to failure, temperatures of the line exceeded the measurement capabilities of the temperature measurement device and so the actual temperature increase cannot be determined.

Chevron Richmond Refinery Interim Investigation Report April 2013

28 U.S. CHEMICAL SAFETY AND HAZARD INVESTIGATION BOARD

Figure 12. Schematic of failed piping from the Chevron Salt Lake Refinery. Similar to the Chevron Richmond Refinery incident, the failed piping contained low amounts of silicon and corroded significantly faster than adjacent piping components.

  1. In January 2007, a failure due to sulfidation corrosion caused a serious fire in the Chevron

Richmond Refinery crude unit resulting in a CWS Level 3 alert, initiating a shelter-in-place for the surrounding community. A carbon steel piping spooli failed catastrophically during operation (Figure 13). The carbon steel piping contained a low percentage of silicon (<0.005 wt. %). The process fluid ignited, injuring a nearby worker. Chevron informed Contra Costa Health Services’ Hazardous Materials Programii

i A piping spool is a small, removable section of piping. In some cases, a piping spool is installed or removed in order to provide a temporary connection or complete disconnection between two piping circuits. (Contra Costa County) in a letter that the metallurgy had been upgraded following this incident as an inherently safer solution. However, the CSB learned that this upgrade was limited to only the immediate piping spool that failed. The inherently safer, more corrosion resistant metallurgy was not implemented more broadly in crude unit high temperature service as a result of this incident. ii Contra Costa Health Services’ Hazardous Materials program is designed to respond to emergencies and monitor hazardous materials within Contra Costa County. See http://cchealth.org/hazmat/ (accessed April 17, 2013).

Chevron Richmond Refinery Interim Investigation Report April 2013

29 U.S. CHEMICAL SAFETY AND HAZARD INVESTIGATION BOARD

Figure 13. Failed piping component that resulted in the 2007 Richmond crude unit fire. This carbon steel piping was found to contain less than 0.005 percent silicon.

  1. Following the August 6, 2012, incident, personnel at the Chevron El Segundo, California,

refinery, a near duplicate of the Richmond refinery, inspected their refinery’s crude unit 4- sidecut piping. Significant thinning was discovered in the line; the piping from the atmospheric crude column to the pumps was removed and substituted with 9-Chrome, an upgraded and inherently safer material of construction.

  1. On November 9, 2009, the Silver Eagle refinery in Woods Cross, Utah, experienced a

catastrophic piping failure due to sulfidation corrosion in a 10-inch pipe, while conducting a temporary operation at higher than normal operating temperature. The pipe was located on the

Chevron Richmond Refinery Interim Investigation Report April 2013

30 U.S. CHEMICAL SAFETY AND HAZARD INVESTIGATION BOARD bottom of a reactor in the de-waxing unit. The failed pipe released hydrogen which subsequently exploded, damaging over 100 homes in the nearby neighborhood.

  1. On October 6, 2011, an explosion and fire resulted from a catastrophic piping failure at a

Canadian refinery in Regina, Saskatchewan, injuring 52 workers. The piping component that failed was substantially thinner than neighboring components. Prior to the incident, the company’s inspection data indicated that wall thickness in the overall piping system was within acceptable limits. However, the specific component that failed was not inspected. Although Canadian authorities are still investigating, metallurgical testing has indicated that hydrogen sulfide corrosion contributed to the catastrophic failure.

  1. In February 2012, the BP refinery crude unit in Cherry Point, Washington, suffered a failure due

to sulfidation corrosion, causing a large fire. This incident demonstrates that even when applying inherently safer concepts to reduce the potential for major hazards, it is still vital to fully understand all processes and piping configurations and incorporate a rigorous inspection program. The piping that failed was constructed of 9-Chrome. The line was used only during start-up operations and otherwise remained in-service and non-flowing. Such lines that do not have regular process flow yet remain in contact with process fluids are commonly referred to as “dead legs.” The failure location was a high-point in the piping connected to the top of an operating process line. Hydrogen sulfide evolved from the process fluid and collected in the 9- Chrome piping. The concentrated vapor-phase hydrogen sulfide severely corroded the 9- Chrome, causing the failure. CMLs were located on adjacent elbow components; however, no CMLs were placed on the straight-run piping component where the failure occurred. The Cherry Point sulfidation failure demonstrates that even with more corrosion-resistant, inherently safer metallurgy, failure from sulfidation corrosion still may occur if piping is not effectively inspected or piping configurations are not adequately evaluated. In addition it is important to conduct a thorough analysis to determine the best material of construction for the process conditions.

Chevron Richmond Refinery Interim Investigation Report April 2013

31 U.S. CHEMICAL SAFETY AND HAZARD INVESTIGATION BOARD Process Hazard Analysis

  1. Chevron personnel analyze numerous deviationsi
  2. Sometimes referred to as a corrosion review, a damage mechanism hazard review analyzes risks

presented by all process failure mechanisms such as corrosion and cracking. Common process failure mechanisms are described in API 571: Damage Mechanisms Affecting Fixed Equipment in the Refining and Petrochemical Industries. for each portion of a process when conducting a Process Hazard Analysis (PHA). These include conditions such as changes in flow and temperature and pressure extremes. Specifically of interest, one of the deviations analyzed was “leak/rupture” of the particular vessel or pipe. For each deviation, the team’s responsibility was to identify causes, consequences, safeguards, and recommendations. The 4-sidecut line was analyzed in the most recent crude unit PHA. Corrosion was not identified as a potential cause of a leak/rupture in the piping (emphasis added). 30 Such a review ensures that potential hazards caused by process conditions, process materials, and external mechanisms are properly identified, analyzed, and systems are put in place to control or eliminate the hazard. Despite Chevron knowledge and expertise of potential damage mechanisms (such as sulfidation corrosion), the CSB found these hazards are only identified in a PHA if the participants conducting the PHA happen to have personal knowledge of the relevant mechanism. The Chevron PHA teams do not typically seek assistance from corrosion experts.ii The inclusion of a damage mechanism hazard review as part of the PHA is not required by the state of California, the California Division of Occupational Safety and Health (Cal/OSHA),iii Contra Costa County, the City of Richmond,iv

i Deviations using guide words (such as no, more, less, as well as) and process parameters (such as flow, pressure, temperature) are analyzed in PHAs. See Center for Chemical Process Safety (CCPS). “Guidelines for Hazard Evaluation Procedures.” 2nd ed., Page 132, 1992. or Chevron standards. Because Chevron does not conduct, and is not required to conduct, a formal damage mechanism hazard review, damage mechanisms are only identified when the PHA team happens to have some knowledge of the mechanism. As a result, many damage mechanisms which occur in various processes are not properly addressed. ii The Crude Unit Business Improvement Network (BIN) Leader, a crude unit expert, reviews portions of the PHA with the PHA team. However, this review did not identify the potential for sulfidation corrosion failures in the 4- sidecut piping. A rigorous review of corrosion and damage mechanisms present in the crude unit was not performed during the PHA process. iii The state of California, under an agreement with the federal Occupational Safety and Health Administration, or OSHA, operates an occupational safety and health program in accordance with Section 18 of the Occupational Safety and Health Act of 1970. See http://www.osha.gov/dcsp/osp/stateprogs/california.html (accessed April 17, 2013). The Department of Industrial Relations administers the California Occupational Safety and Health Program, commonly referred to as Cal/OSHA. The program applies to all public and private sector places of employment in the state, with some exceptions. See http://www.dir.ca.gov/dosh/dosh1.html (accessed April 17, 2013). iv The City of Richmond adopted an ordinance on Industrial Safety, Richmond Municipal Code Chapter 6.43 (also known as the RISO), on December 18, 2001, “for the purposes of protecting public health and safety by prevention of accidental release of hazardous materials and to assure protection of the environment.” Richmond Municipal Code §6.43.040 (February 5, 2013). There are two facilities, including Chevron, that are located in the City of Richmond and subject to this ordinance. More information about the RISO is provided later in the report.

Chevron Richmond Refinery Interim Investigation Report April 2013

32 U.S. CHEMICAL SAFETY AND HAZARD INVESTIGATION BOARD

  1. During a hazard analysis process such as a PHA, the evaluation team has to determine the

likelihood of a hazardous consequence occurring. Then the team must identify safeguards which will reduce the risk of the hazard to an acceptable level. A recognized methodology for consistently and objectively making these determinations could include the use of quantitative, semi-quantitative, or qualitative tools.31 Chevron does not employ a prescribed methodology for determining the likelihood that an incident will occur or whether a safeguard will be effective. Instead, Chevron relies upon the judgment of the people on the PHA team, who base their conclusions upon their collective experiences, beliefs, and areas of expertise. In its 2009 crude unit PHA, Chevron simply cited non-specific, judgment-based qualitative safeguards such as: utilizing metallurgy to minimize corrosion, having effective maintenance and inspection programs, and providing pipe wall corrosion allowances.i

  1. Following the August 6th incident, Cal/OSHA inspected the Chevron facility and issued

citations. Only one citation related to PHAs, and it was not associated with evaluating the effectiveness of safeguards. Rather, the emphasis was that Chevron’s PHA did not adequately account for hazards caused by other units associated with the crude unit. The citation stated “The Employer [Chevron] failed to perform an effective Process Hazard Analysis [PHA] of the crude unit. Specifically, it failed to identify, evaluate, and control potential hazards caused by upstream and downstream units that provide and receive feed from the crude unit.” The effectiveness of these safeguards was neither evaluated nor documented; instead the safeguards were merely listed in the PHA. Had the adequacy of these safeguards been verified, improved safeguards intended to protect against sulfidation-induced failure of carbon steel piping could have been recommended. 32

i Corrosion allowance refers to extra wall thickness added as a safety factor to the design of a piece of equipment beyond that needed solely for mechanical considerations such as design temperature and pressure. This extra thickness is provided to accommodate for expected loss of wall thickness due to corrosion over the life of the equipment. Had the Cal/OSHA regulation required documentation of the effectiveness of safeguards, Chevron would have been obligated to conduct this analysis and Cal/OSHA inspectors could rely on the regulation for support during inspections.

Chevron Richmond Refinery Interim Investigation Report April 2013

33 U.S. CHEMICAL SAFETY AND HAZARD INVESTIGATION BOARD Operational Changes

  1. The original design of the 4-sidecut circuit included equipment which had the effect of removing

dissolved hydrogen sulfide, the most aggressive sulfur compound associated with sulfidation corrosion, from the 4-sidecut light gas oil process fluid. As a result, the 4-sidecut equipment was effective in reducing the sulfidation corrosion rate. This allowed the 4-sidecut equipment to be constructed of carbon steel. In 1991, this 4-sidecut equipment was taken out of service. No management of changei

  1. Crude oil feedstock used at the Chevron Richmond Refinery is obtained from a variety of

different sources that are blended before processing. These various crudes have different compositions, such as varying sulfur compounds and concentrations. These crudes can have differing corrosion effects on process equipment and piping. There is an increasing trend in crude oil refining to process less expensive “opportunity crudes” because they can provide significant cost savings to the company. (MOC) was performed to analyze the effect of the elimination of this hydrogen sulfide-removing equipment on 4-sidecut corrosion rates. Such an MOC would have ensured that the increase in sulfur concentration on the carbon steel 4-sidecut piping was reviewed prior to removing the equipment. ii However, these crudes may contain more undesirable characteristics such as high sulfur content, high naphthenic acid content, or very heavy hydrocarbons33

i Management of change requires that employers have procedures to manage changes to process chemicals, technology, equipment, and procedures. The procedures must address the technical basis for the change, the impact on safety and health, and training required for employees affected by the change. that a refinery may not have been originally designed to process. Refinery equipment may not be the proper material of construction to achieve the design life of the equipment when exposed to the different operating conditions. Additional mitigation may be needed to reduce risk. In 1984, the Chevron Richmond Refinery crude oil feed contained approximately 85 volume % Alaskan North Slope (1 wt. %) crude oil. As the refinery began running more high-sulfur content crudes, the sulfur content in the 4-sidecut line steadily increased (Figure 14), as discussed below. ii Crude oil costs can account for up to 90% of the operating costs in a refinery. See Qu, Dingrong, Xiaohui Liu, Xiu Jiang, Zhenggui Lan, and Guangbin Shan. “Setting Critical Operational TAN and Sulfur Level for Crude Distillation Units.” Corrosion 2011 Conference & Expo. Paper No. 11362. NACE International, 2011.

Chevron Richmond Refinery Interim Investigation Report April 2013

34 U.S. CHEMICAL SAFETY AND HAZARD INVESTIGATION BOARD

Figure 14. Graph shows the percentage increase from 1984 values of the sulfur content in the 4-sidecut.

  1. When Chevron introduces a new crude, an MOC is generated to evaluate the potential impact on

the refinery.i

  1. The CSB found that increased Chevron Richmond usage of non-domestic crude feed stock over

time resulted in higher sulfur content in the process fluid passing through the 4-sidecut piping. Specifically, the percentage of sulfur in the Richmond refinery crudes increased nearly 85% between 1984 and 2012, including a significant jump of 32% from 1998 to 1999. This increase in sulfur content corresponded with a simultaneous increase in the usage of non-domestic crude feed at the Richmond refinery. While Chevron stayed under its established crude unit design basis for total wt. % sulfur of the blended feed to the crude unit, the sulfur composition significantly increased over time. Historic data indicates that the sulfur in the 4-sidecut stream has increased from 0.8 to 1.6 wt%. This increase in sulfur composition likely increased corrosion rates in the 4-sidecut line. Chevron did not conduct an MOC analyzing the impact that increases in sulfur composition would have on corrosion in the crude unit. Chevron also did not change its corrosion monitoring programs in response to the increased sulfur content.

i Chevron MOCs on new crudes considered general operational issues but did not analyze corrosion effects from sulfidation corrosion.

Chevron Richmond Refinery Interim Investigation Report April 2013

35 U.S. CHEMICAL SAFETY AND HAZARD INVESTIGATION BOARD

  1. Sulfidation corrosion rates increase in piping circuits as temperature and sulfur content increase.

Accordingly, the 4-sidecut sulfidation corrosion rate increased between 1984 and 2012 due to the increase in sulfur content in the line. The CSB found that for the 26-year period from the installation of the piping in 1976 through 2002, the 52-inch 4-sidecut component had lost approximately 33 percent of its wall thickness. From the single inspection of the 52-inch component in 2002 to the incident in 2012 – just ten years – an additional 57 percent of the original component nominal wall thickness was lost near the rupture location due to sulfidation corrosion.i

  1. API RP 939-C states that refinery feed stock changes reduce the relevance of past inspection

data when predicting future corrosion rates: In addition to the sulfur content increase, the 4-sidecut draw temperature increased from 625 °F in 1992 to 680 °F in 2002. Corrosion rates and remaining life calculations based on past sulfur content and temperatures may not accurately reflect current corrosion rates if process conditions have changed. Inspection based on historical corrosion rates may be too infrequent to detect an increase in corrosion caused by adverse changes in process conditions, potentially leading to equipment failure. Oil refineries that processed a consistent diet of a particular crude oil or crude blend could often base future predictions on past experience. However, over the past 20+ years, global economics have resulted in many refineries processing tens of different crudes in any given year; thus, minimizing the accuracy, or even feasibility, of predictions based on historical data. Additionally, the verification of the actual corrosion rate experienced while processing a specific crude oil is very difficult.34

  1. API 570 Piping Inspection Code: In-service Inspection, Rating, Repair, and Alteration of Piping

Systems, the API standard for inspecting piping, recommends companies to incorporate process changes into inspection programs. The standard states:

The owner/user is … responsible for implementing an effective MOC process that will review and control changes to the process and to the hardware. An effective MOC process is vital to the success of any piping integrity management program in order that the inspection group will be able to anticipate changes in corrosion or other deterioration variables and alter the inspection plan to account for those changes. The MOC process shall include the appropriate materials/corrosion experience and expertise in order to effectively forecast what changes might affect piping integrity. The inspection group shall be involved in the approval process for changes that may affect piping integrity.

i The 4-sidecut 52-inch component had an original wall thickness of 0.322 inches. Metallurgical analysis found the thinnest portion of the 52-inch 4-sidecut component was 0.03 inches.

Chevron Richmond Refinery Interim Investigation Report April 2013

36 U.S. CHEMICAL SAFETY AND HAZARD INVESTIGATION BOARD Changes to the hardware and the process shall be included in the MOC process to ensure its effectiveness [emphasis added].35 Chevron failed to comply with the requirements of API 570 when it did not conduct an MOC to thoroughly evaluate the change of increasing sulfur weight percentage in crude oil feed and to assess how it might affect corrosion rates within the 4-sidecut piping circuit. After the August 6, 2012, incident, Cal/OSHA inspected the Chevron Richmond Refinery and issued citations.

i Chevron Sulfidation Corrosion Inspection and Mitigation However, Cal/OSHA did not issue any citations for failing to perform an MOC when sulfur composition in the crude oil feed was increased.

  1. In the ten years prior to the incident, a small number of Chevron personnel with knowledge and

understanding of sulfidation corrosion made at least six recommendations (listed in the following six paragraphs and included in Figure 15) to increase inspections or upgrade the metallurgy in the 4-sidecut piping. The recommendations made by these personnel were not implemented by Chevron management.

Figure 15. Key events at the Richmond refinery between 1998 and 2013.

i Cal/OSHA citations issued January 30, 2013.

Chevron Richmond Refinery Interim Investigation Report April 2013

37 U.S. CHEMICAL SAFETY AND HAZARD INVESTIGATION BOARD

  1. In August 2002, a Chevron Richmond Refinery employee performed a study analyzing

sulfidation corrosion rates in the crude unit and identifying potentially vulnerable areas. The employee discovered that the 4-sidecut operating temperature had been increased and concluded that this increase would cause more hydrogen sulfide to evolve, leading to increased sulfidation corrosion rates. As a result of these findings, the employee recommended increased inspection of the 4-sidecut piping and noted that this piping might need to be upgraded from carbon steel to 5-Chrome, a steel alloy that is more resistant to sulfidation corrosion. In 2002, proactively following up on this study, the crude unit inspector conducted additional piping inspection and identified accelerated corrosion in the 52-inch 4-sidecut component. The inspector recommended upgrading this piping during the next shutdown in 2007. In the inspector’s 2002 accomplishments, Chevron management acknowledged this effort to prevent a significant incident; it was characterized as “a save.” However, during the 2007 turnaround the recommendation was not implemented, and because a CML was not added to the inspection program, the 52-inch component was not inspected after 2002.

  1. In February 2006, a team consisting of a materials and corrosion engineer, an inspector, a

process engineer, a metallurgist, and a design engineer issued a Corrosion Mitigation Plan for the Chevron Richmond Refinery crude unit. The report specifically identified the 4-sidecut piping to be at risk for high temperature sulfidation corrosion. The report described that low silicon carbon steel can corrode faster than carbon steel manufactured with higher silicon content, and recommended that 100 percent inspection be performed on the 4-sidecut line using continuous monitoring technology. During the 2007 crude unit turnaround, continuous monitoring probes were only installed on a segment of the 4-sidecut line that did not include the 52-inch component that ultimately failed. The 100 percent inspection recommended in the 2006 Corrosion Mitigation Plan was not performed.

  1. During the 2007 turnaround, the crude unit inspector recommended that the refinery upgrade the

entire 4-sidecut piping with 5-Chrome. The recommendation was based on findings obtained during the 2002 crude unit turnaround, where the crude unit inspector found that the 52-inch 4- sidecut component had lost one-third of its wall thickness due to corrosion. However, after evaluation, this recommendation was not accepted by the turnaround planning team. Basing its decision on limited inspection data, Chevron determined that the 8-inch portion of the 4-sidecut piping that ran from the atmospheric column to the pump, the portion which included the 52- inch component, had sufficient wall thickness to last to the next turnaround scheduled for Fall 2011.i

i This decision was made without reinspecting or evaluating the thickness of the thinned 52-inch component identified in 2002 that prompted the recommendation. The piping downstream of the pump, which operates at a higher pressure, was determined not to have sufficient wall thickness to last to the next turnaround. This piping was removed and replaced with 9-Chrome, an upgraded and inherently safer metallurgy. The 52- inch component of the 8-inch piping between the atmospheric column and the pump was not replaced during the 2007 turnaround even though it had been identified as thinned in 2002.

Chevron Richmond Refinery Interim Investigation Report April 2013

38 U.S. CHEMICAL SAFETY AND HAZARD INVESTIGATION BOARD Furthermore, a permanent CML was not placed on the 52-inch component, and it was not entered into the inspection database. As a result, the component was not inspected again.

  1. In September 2009, Chevron ETC corrosion experts released a formal technical report

discussing sulfidation corrosion and the specific issues associated with carbon steel, including the potential for high corrosion rates in carbon steel piping containing low percentages of silicon. In its report, Chevron ETC issued recommendations for inspection and provided guidelines for prioritizing piping circuits susceptible to sulfidation corrosion so that high-risk lines could be evaluated first. It was recommended that 100 percent component thickness testing be completed on all high priority lines one time to identify thin, low-silicon components to establish a baseline of corrosion rate and risk for failure. Following the release of the report, the Chevron Richmond Refinery materials group completed the risk-ranking of the carbon steel piping in the Richmond Lube Oil Project (RLOP) and in the crude unit, two units known to be susceptible to sulfidation corrosion. The group identified the crude unit 4-sidecut line as a high risk line per the report ranking guidance. Instead of completing the 100 percent component inspection, the 4-sidecut was recommended for replacement with 9-Chrome. However, the replacement recommendation was denied because the available, limited inspection data indicated the piping would last until the next turnaround. Subsequently, the alternative 100 percent component inspection was also never performed.

  1. Five months prior to the incident in March 2012, a Chevron corporate review of Richmond

identified that inspection of all carbon steel components susceptible to sulfidation corrosion was not being performed at the Richmond refinery. In addition to identifying that CMLs were not in the proper locations, this corporate review found that critical inspection recommendations were being submitted to the shutdown planning process, but were being denied. Chevron corporate identified that Richmond refinery leadership needed to review and implement the 2009 Chevron ETC report recommendations.

  1. Chevron conducts “Intensive Process Reviews” prior to turnarounds. This process involves

knowledgeable individuals including Business Improvement Network leaders, process engineers, metallurgical engineers, design engineers, and turnaround planners. The purpose of the review is to identify key unit issues that should be addressed and repaired during the unit turnaround. Prior to the 2011 crude unit turnaround, Chevron personnel conducted an Intensive Process Review of the crude unit and specifically recommended that the 4-sidecut carbon steel piping “should be upgraded to 5 Cr [5-Chrome]… due to sulfidation.” Although the Intensive Process Review identified sulfidation problems in the 4-sidecut line, this activity was ineffective. The 4-sidecut piping was not upgraded during the 2011 crude unit turnaround.

  1. In preparation of the work list for the 2011 crude unit turnaround, the crude unit inspector and

crude unit metallurgist recommended that the 4-sidecut line be replaced with an upgraded metallurgy, 9-chrome, the metallurgy recommended in the Chevron new construction guidelines for piping in high temperature and high sulfur service. The recommendation was based on the

Chevron Richmond Refinery Interim Investigation Report April 2013

39 U.S. CHEMICAL SAFETY AND HAZARD INVESTIGATION BOARD high priority ranking of the 4-sidecut line, corrosion history, and both Chevron and industry recommended best practice. However, the turnaround management team determined that the inspection data available for the 4-sidecut piping, from CMLs on elbow components which are less prone to sulfidation corrosion, did not support a material upgrade during the 2011 turnaround.i, ii

i This decision was made without reinspecting or evaluating the thickness of the 52-inch component identified in 2002. The lack of data on the more susceptible 4-sidecut straight-run piping components was not considered.

ii A portion of the 4-sidecut 12-inch line was replaced during the 2011 turnaround with carbon steel due to thinning caused by sulfidation corrosion.

Chevron Richmond Refinery Interim Investigation Report April 2013

40 U.S. CHEMICAL SAFETY AND HAZARD INVESTIGATION BOARD Inherently Safer Systems

  1. The Center for Chemical Process Safety (CCPS) is a corporate membership organization that

identifies and addresses process safety needs within the chemical, pharmaceutical, and petroleum industries.36 Chevron is a corporate member of CCPS.37 The CCPS book Inherently Safer Chemical Processes, 2nd ed. defines inherently safer design as the process of identifying and implementing inherent safety in a specific context that is permanent and inseparable.38 In the book Guidelines for Engineering Design for Process Safety, 2nd ed., CCPS states “inherently safer design solutions eliminate or mitigate the hazard by using materials and process conditions that are less hazardous.”39

  1. Inherently safer technologies are relative; a technology can only be described as inherently safer

when compared to a different technology with regard to a specific hazard or risk.

40 A technology may be inherently safer with respect to one risk but not safer from another risk. For this reason, it is important to carry out a comprehensive, documented hazard analysis to determine the individual and overall risks in a process and assess how the risks can be effectively minimized to control hazards. An inherently safer systems review details a list of choices offering various degrees of inherently safer implementation. The review should include risks of personal injury, environmental harm, and lost production, as well as evaluating economic feasibility.41

  1. It is simpler, less expensive, and more effective to introduce inherently safer features during the

design process of a facility rather than after the process is already operating.

42

  1. After a 2007 incident caused by a pipe failure in the Richmond refinery crude unit, Chevron

implemented an “Inherently Safer Solution” by upgrading the piping to metallurgy that was less susceptible to sulfidation corrosion. However, the change was implemented intuitively without a supporting inherent safety review or failure mechanism hazard review to provide a detailed documented technical rationale for the metallurgy selection. Without such a review, the material selected cannot be analyzed to determine if it is the best inherently safer solution for the process in order to minimize risk. Process upgrades, rebuilds, and repairs are additional opportunities to implement inherent safety concepts. Conducting a comprehensive hazard review to determine risks and identify ways to eliminate or reduce risks is an important step in implementing an inherently safer process. Chevron training programs on inherently safer systems reflect this approach, stating “we have the greatest opportunity to eliminate or minimize hazards during the development phase of new projects or major revamps of existing facilities.”

Chevron Richmond Refinery Interim Investigation Report April 2013

41 U.S. CHEMICAL SAFETY AND HAZARD INVESTIGATION BOARD

  1. Following the August 6, 2012, incident, the 4-sidecut piping circuit at the Richmond refinery

was upgraded from carbon steel to 9-Chrome.i However, Chevron did not produce a documented inherently safer hazard review before commencing the rebuild of the crude unit. The crude unit at the Chevron El Segundo refinery is nearly identical in construction and design to the Richmond refinery crude unit. Chevron informed the CSB that piping downstream of the 4-sidecut pumps in the 4-sidecut piping circuit at the El Segundo refinery was upgraded in 2001ii

  1. An effectiveness ranking of techniques used to control hazards and the risk they represent can be

described as a hierarchy of controls. The further up the hierarchy, the more effective the risk reduction achieved (Figure 16). All concepts in the hierarchy of controls should be included in the process of risk assessment and reduction. Upgrading metallurgy to a more corrosion resistant material may be a high ranking, inherently safer choice for certain corrosion mechanisms, such as sulfidation corrosion. Holding other variables constant, upgrading the material of construction may reduce the severity of corrosion and the likelihood of a failure.

from carbon steel to stainless steel. As stated previously, after the August 6, 2012, Richmond incident, the 4-sidecut piping upstream of the 4-sidecut pumps at the El Segundo refinery was upgraded from carbon steel to 9-Chrome. Had a comprehensive inherently safer systems review been conducted at the Richmond refinery following the August 6th incident, a different metallurgy, such as stainless steel which was installed at the Chevron El Segundo Refinery, may have been identified as inherently safer than 9-Chrome with respect to sulfidation corrosion.

Figure 16. Hierarchy of controls. The boxes reflect inherently safer controls from left to right, based on Process Plants: A Handbook for Inherently Safer Design Second Edition; Kletz, Trevor Amyotte, Paul; CRC Press 2010.

  1. Chevron employees have recommended implementing inherently safer designs through the

MOC process, incident investigations, technical reports, and recommendations from employees in the past. However, the CSB has not identified any documented, thorough analysis of the proposed inherently safer solutions. In addition, Chevron has repeatedly failed to implement proposed inherently safer recommendations. For example, following the discovery of significant 4-sidecut piping sulfidation corrosion in 2002, a Chevron inspector issued the following recommendation to replace the piping in the 2007 turnaround:

i After the 2012 incident, the Richmond refinery stated that stainless steel was susceptible to chloride stress corrosion cracking and should not be used. ii Chevron verbal estimate for date of piping installation. No MOC was conducted to review and document this change.

Chevron Richmond Refinery Interim Investigation Report April 2013

42 U.S. CHEMICAL SAFETY AND HAZARD INVESTIGATION BOARD The #4 sidecut piping from C-1100 to P-1149/A to E-1113 was RT (x- ray) inspected for hot H2S [sulfidation] corrosion. The piping is actively corroding, particularly on the section on the discharge line from the pumps near the exchanger; the line upstream of the P-1149/A pumps is corroding as well. Corrosion rates indicate that the piping has 4 years of remaining life until the refinery throwaway thickness of 0.14” [inch] is reached. The carbon steel piping is currently running at temperatures between 650 °F on the pump suction line to 641 °F on the line just before E1113; the upper limit for carbon steel piping in this service is 550 °F. A materials upgrade to 5 chrome would raise the upper limit to between 650-750 °F. Additionally, the ABCR piping loop from the same sidecut draw line off of the column to P-1148/A to E-1111 is also carbon steel and operates at the same temperatures, rendering the ABCR piping system to E-1111 susceptible to hot H2S corrosion as well. INFORMATION Replace the existing #4 sidecut piping noted above from C-1100 through P-1149/A to E1113 and P-1148/A to E-1111 (approximately 700’[feet] of 12”, 10”, 8” and 6”piping, plus some 4”and 3” at the P-1149/P-1148 suction/discharge headers). Upgrade the pipe material from carbon steel to 5 chrome. Recommendation To implement this recommendation, Chevron initiated an MOC in 2006 to replace the piping during the 2007 Turnaround. However, the MOC supporting documents had a narrowed scope to only replace the section of piping from P-1149/A pumps to the E-1113 heat exchanger because Chevron reduced the work scope during the 2007 turnaround planning process. The Description of Change in the MOC stated: Existing line is carbon steel in a hot service that operates in the range where high temperature sulfadation [sic] occurs. The line has been uti inspected and found to be nearing tminii Contradicting this Description of Change detailing a replacement of the entire 4-sidecut piping circuit, the MOC Summary Review and attached documentation only authorized replacement of the piping from the P-1149’s to E-1113. The MOC states: requiring replacement. Due to the higher temperature 9CR [9-Chrome] would be the prefered [sic] material.

i UT is an abbreviation used to indicate ultrasonic thickness testing inspection technique. ii Tmin is an abbreviation used to indicate minimum required piping wall thickness.

Chevron Richmond Refinery Interim Investigation Report April 2013

43 U.S. CHEMICAL SAFETY AND HAZARD INVESTIGATION BOARD 4 S/C piping has been operating hotter in recent years. The hotter temperatures 550 °F are in the high temperature sulfadation [sic] range. Additionally the section of 4 S/C piping from P-1149' s to E-1113 has been found to be nearing tmin. The section of pipng [sic] from P-1149’s to E-1113 will be replaced with 9 Cr [9-Chrome] piping. As a result, the portion of the piping containing the 52-inch component that failed on August 6th remained in service. Although the recommendation was intended to more broadly apply inherently safer materials of construction, the final implementation by the MOC limited the application of this more corrosion resistant metallurgy.i

  1. In 2007, the Chevron Richmond Refinery conducted training to teach employees about the

importance of complying with the City of Richmond’s Industrial Safety Ordinance (RISO) Again, the inherently safer, more corrosion resistant, metallurgy was not implemented more broadly in crude unit high temperature service. Other examples are discussed above in the section entitled Chevron Sulfidation Corrosion Inspection and Mitigation. ii inherent safety guidance. The training states “we should always strive to implement inherently safer strategies to the greatest extent feasible.” However, Chevron did not regularly or rigorouslyiii apply inherently safer design strategies in opportunities including PHAs, MOCs, incident investigation recommendations, and during turnarounds.iv

  1. Chevron uses an inherently safer design checklist

v

i As discussed earlier, only the section of piping downstream of the pumps was replaced with 9-Chrome. for PHAs to meet inherently safer systems analysis requirements of the RISO. The checklist, provided by Contra Costa County, is intended to aid identification of opportunities to implement inherently safer design during the PHA process. The checklist was intended to stimulate discussion and analysis of potential opportunities to implement inherently safer design. Contra Costa County’s guidance on the IST checklist states that some items may need to be reviewed by a team that is outside the PHA team in order to involve people with the required expertise. Chevron utilized the Contra Costa County inherently safer technologies checklist (IST Checklist) during the 2009 crude unit PHA. ii The RISO will be discussed in more detail in the Regulatory Oversight section below. iii Chevron does not utilize inherent safety guidewords or checklists during the MOC or incident investigation process. Inherently safer guidewords help direct the inherently safer review process. Examples of guidewords include minimization, substitution, moderation, and simplification. These words may be applied to materials, product inventory, process controls, process piping, and siting, among others. See Center for Chemical Process Safety (CCPS). “Inherently Safer Chemical Processes – A Life Cycle Approach.” 2nd ed., Table 8.3, 2009. iv As stated in the Regulatory Oversight section below, Chevron is only required to conduct inherently safer design strategies during PHAs and for the construction of new processes. v Contra Costa County’s guidance document entitled “Attachment C: Inherently Safer Systems Checklist” is provided as a tool for facilities to utilize during the PHA process. The actual use of the checklist is not required. See http://cchealth.org/hazmat/pdf/iso/attachment_c.pdf (accessed April 17, 2013).

Chevron Richmond Refinery Interim Investigation Report April 2013

44 U.S. CHEMICAL SAFETY AND HAZARD INVESTIGATION BOARD However, only three permissively wordedi inherently safer system recommendations were made, none of which addressed sulfidation corrosion or piping metallurgy. In addition, Chevron performed the checklist analysis using the same individuals who conducted the PHA despite Contra Costa County’s guidance to involve other personnel with additional expertise. Performing a superficial analysis, Chevron failed to adequately consider inherently safer systems like improved metallurgy for corrosion resistance. For instance, the checklist prompted: “Use corrosion resistant material?” In response, Chevron stated that “vessel specifications and piping classifications include a conservative wall thickness and an appropriate corrosion allowance for each service.” No mention is given to improving metallurgy to reduce corrosion. There is also no documented analysis regarding potential materials with enhanced corrosion resistance. There was no documentation of the inherently safer technologies analysis, and no inherently safer alternatives were documented. The checklist as applied by Chevron was a “check-the-box” exercise. Chevron Richmond PHAs were thus not an effective means of driving inherent safety. The table below gives a sample of the IST checklist questions along with the associated Chevron responses.ii Contra Costa County Checklist Question

Chevron IST Analysis Use Corrosion resistant materials? Vessel specifications and piping classifications include a conservative wall thickness and an appropriate corrosion allowance for each service. Use smallest diameter piping? Piping sizes are the smallest possible for the capacity of the unit. Substitute less hazardous raw materials? Raw materials in use are of minimal hazard. Dilute hazardous raw materials? Raw materials currently dilute where applicable. Minimize off-site impacts? #4 Crude Unit is located at a distance from public areas. Easy operation of valves designed to prevent inadvertent error? In general, valves are arranged in a logical manner. Increasing wall strength? Piping classifications include a conservative wall thickness and an appropriate corrosion allowance for each service.

implementation of the county’s inherently safer systems analysis requirements in the PHA process. The inspectors determined that Chevron’s PHAs “follows the requirements specified by … ISS [inherent safety systems] guidelines.” This approval by Contra Costa County i All began with “consider” and two began with “consider evaluating” which does not require any action by Chevron. ii The comprehensive list of IST checklist questions and Chevron’s corresponding answers are provided separately on the CSB website.

Chevron Richmond Refinery Interim Investigation Report April 2013

45 U.S. CHEMICAL SAFETY AND HAZARD INVESTIGATION BOARD conveyed to Chevron that the regulator considered that Chevron’s minimal analysis of opportunities to implement inherently safer design, its “check-the-box” exercise, was sufficient.

  1. Effectively implementing inherently safer technology provides an opportunity for preventing

major chemical incidents. The August 6, 2012, incident at Chevron and other incidents43

  1. It is essential that MOCs incorporate hazard analyses and the assessment of opportunities to

implement inherently safer systems. This process can be assisted through the use of guidewords to trigger the thought process. CCPS states that “by including inherent safety guidewords in a management of change program, the MOC protocol recognizes inherent safety as both a driving force for - and as an opportunity during - implementation.”

throughout the refining industry highlight the difficulty in preventing failure caused by sulfidation corrosion in low silicon carbon steel piping solely through inspection, a procedural safeguard that is low on the hierarchy of controls. Using inherently safer design concepts to avoid issues such as variation in corrosion rate in carbon steel piping due to hard-to-determine silicon content will reduce future similar failures in refineries. Chevron and other process plants’ implementation of inherently safer systems to the greatest extent feasible would provide a higher degree of protection from incidents like the one that occurred on August 6, 2012. 44

  1. Layer of Protection Analysis (LOPA) is a well-recognized hazard analysis methodology that is

intended to determine if a sufficient number of safeguards or layers of protection exist to protect against a particular hazard or accident scenario.

45 As the potential consequence of a particular scenario increases, the number of safeguards or protection layers must increase to reduce the risk of the scenario to what is considered an acceptable or tolerable level.46 LOPA can be used to help an organization decide if the risk of a scenario or hazard has been reduced to a level that is “as low as reasonably practicable” (ALARP).47 ALARP is a risk reduction goal, where risk reduction efforts are continued until the incremental effort to further reduce risk becomes grossly disproportionate to the level of additional risk reduction.48 By rigorously reviewing accident or hazard scenarios, evaluating the potential consequence of the scenario, and identifying the safeguards or layers of protection necessary to drive risk to as low as reasonably practicable, LOPA becomes an effective organizational tool for implementing a Process Safety Management (PSM) mechanical integrity program.49 LOPA also helps an organization decide which safeguards to focus on during operation, maintenance, and training.i, 50 In addition, the LOPA methodology includes provisions allowing an organization to determine the availabilityii and effectiveness of a safeguard or layer of protection in reducing the risk of a potential scenario.51

i Chevron is a member of CCPS and peer-reviewed the CCPS LOPA publication. See Center for Chemical Process Safety (CCPS). “Layer of Protection Analysis – Simplified Process Risk Assessment,” page xiv, 2001.

ii The probability that a system will be able to perform its designated function when required for use. Another term frequently used is Probability of Failure on Demand (PFD). Availability = 1 - PFD. See Center for Chemical Process Safety (CCPS), “Guidelines for Safe Automation of Chemical Processes,” page XIX, 1993.

Chevron Richmond Refinery Interim Investigation Report April 2013

46 U.S. CHEMICAL SAFETY AND HAZARD INVESTIGATION BOARD Regulatory Oversight

  1. The Contra Costa County Industrial Safety Ordinance (ISO) requires that regulated facilitiesi
  2. The purpose of the ISO is to “prevent accidental release of hazardous chemicals; improve

accident prevention by soliciting participation from industry and the community; require industry to submit a Safety Plan; and conduct audits of the plan and inspections of the industrial plants.”

within the county implement safety programs to prevent chemical incidents. Since the ISO took effect in January 1999, Contra Costa County has continued to make improvements to the implementation of the prevention program’s elements. 52

  1. Although the City of Richmond is located in Contra Costa County, the county does not have

jurisdiction over industrial facilities located within the city limits. Thus, the ISO is not enforceable within the City of Richmond. On December 18, 2001, the City of Richmond adopted its own industrial safety ordinance (RISO), based on the ISO.

ii, 53 The RISO covers the two facilities located within the City of Richmond: Chevron and General Chemical West Richmond Works.54 Pursuant to an agreement between the two parties, Contra Costa County inspects these two facilities and implements the RISO for the City of Richmond.55

  1. The ISO and RISO contain identical provisions that address the use of inherent safety concepts.

Each defines “inherently safer systems” as “feasible alternative equipment, processes, materials, lay-outs and procedures meant to eliminate, minimize, or reduce the risk of a major chemical accident or release by modifying a process rather than adding external layers of protection.”

56 For all covered processes, the stationary source shall consider the use of inherently safer systems in the development and analysis of mitigation items resulting from a process hazard analysis and in the design and review of new processes and facilities. The stationary source shall select and implement inherently safer systems to the greatest extent feasible. If a stationary source concludes that an inherently safer system is not feasible, the basis for this conclusion shall be documented in meaningful detail.

Both regulations also require that: 57

i The ISO applies to oil refineries and chemical plants within the county jurisdiction that are required to submit a Risk Management Plan to EPA and are program level 3 stationary sources as defined by the California Accidental Release Prevention (CalARP) Program. There are seven facilities covered by the ISO, five of which are refineries. See

http://cchealth.org/hazmat/iso/ (accessed April 17, 2013). ii At the time of the August 6th incident, the RISO did not include amendments made to the ISO in 2006. The 2006 amendments required an expansion of human factors programs, expanded management of organizational change reviews, security vulnerability analyses, and safety culture assessments. These amendments were subsequently adopted by the City of Richmond in February 2013. See http://cchealth.org/hazmat/iso/ (accessed on April 9, 2013).

Chevron Richmond Refinery Interim Investigation Report April 2013

47 U.S. CHEMICAL SAFETY AND HAZARD INVESTIGATION BOARD

  1. The apparent intent of the ISO and RISO regulations is to require companies to evaluate their

processes in order to identify opportunities to implement inherently safer systems. However, the plain language contained within these regulations conflicts with this intent. Both regulations contain the following permissive language: “the stationary source shall consider the use of inherently safer systems…”58

  1. The language within the ISO and RISO regulations also requires effective action to implement

inherently safer systems “to the greatest extent feasible.” This language does not require companies to conduct a comprehensive analysis and implement inherently safer systems even where feasible. It only requires such an analysis be considered. The regulations allow companies to merely engage in an activity contemplating the potential use of inherently safer systems. 59 If an inherently safer system is not implemented, the regulations require that the basis for this decision be “documented in meaningful detail.” 60 However, these regulations do not require documentation supporting the adequacy of existing “inherently safer” 61

  1. The inherently safer systems requirements of the ISO and RISO are only triggered by the

conduct of a PHA or the construction of a new process. claims. Chevron’s compliance with the RISO is indicative of this deficiency. In its inherently safer systems checklist, Chevron simply concluded that its systems were inherently safer to the extent that no modifications were necessary. However, the company offered no documentation to substantiate these claims. Had the ISO and RISO regulations required analysis of inherently safer systems regardless of what the site already had in place, Chevron may have implemented the inherently safer recommendations made by technical staff to replace the 4-sidecut with an inherently safer metallurgy. 62

  1. The Contra Costa County PHA guidance document presents four categories of risk reduction:

Rebuilds, repairs, MOCs, and the implementation of incident investigation corrective actions do not require the analysis and application of inherently safer systems. i inherent, passive, active, and procedural (Figure 15).ii It states that all four categories should be used in the development of recommendations from process hazard analyses.63 It reiterates the CCPS statement that all may contribute to the overall safety of a process, but that inherent safety is the most effective.64 It goes on to state “The inherent and passive categories should be implemented when feasible for new processes and facilities and used during the review of Inherently Safer Systems for existing processes if these processes could cause incidents that could result in a Major Chemical Accident or Release.”65

i The guidance document uses CCPS definitions for the identified categories of risk reduction. This wording in the guidance ii Inherent risk reduction involves eliminating the hazard by using materials and process conditions that are non- hazardous. Passive risk reduction is defined as minimizing the hazard through process and equipment design features that reduce the frequency or consequence of the hazard without active functioning of any device. Active risk reduction includes using controls, alarms, safety instrumented systems, and mitigation systems to detect and respond to process deviations from normal operation. Procedural risk reduction achieves the lowest level of risk reduction and involves using policies, operating procedures, training, administrative means, emergency response, and management approaches to prevent incidents and minimize the effects of an incident.

Chevron Richmond Refinery Interim Investigation Report April 2013

48 U.S. CHEMICAL SAFETY AND HAZARD INVESTIGATION BOARD document demonstrates the importance Contra Costa County places on risk reduction and prevention such as metallurgy upgrades; however, as a guidance document, it is non-mandatory.

  1. The California Division of Occupational Safety and Health (Cal/OSHA) has jurisdiction over

employee safety in California.66 Cal/OSHA is a division of the California Department of Industrial Relations and has operated a state plan industrial health and safety program since 1973 under a delegation from the U.S. Occupational Safety and Health Administration (OSHA). Cal/OSHA conducts inspections of California workplaces in response to industrial accidents, safety complaints, or as part of an inspection program targeting specific industries.67 Consideration of inherently safer processes is not currently a required component of any Cal/OSHA (or federal OSHA) standard or regulation.i

  1. The State of California has promulgated process safety regulations similar to OSHA

68 for the prevention or minimization of the consequences of the accidental release of acutely hazardous chemicals.69 These regulations require that covered employers perform a PHA to identify, evaluate and control hazards involved in the process using recognized methodologies.70

  1. California regulations, however, do not provide for a specific review of the effectiveness of the

proposed safeguards to control the hazards identified in the PHA using recognized methodologies such as Layers of Protection Analysis (LOPA).

71

  1. The Energy Institute, an industry technical working group

Additionally, California regulations do not have any requirements for the use of inherently safer systems analysis and the hierarchy of controls for establishing safeguards for identified process hazards. Cal/OSHA, like federal OSHA, also does not require damage mechanism hazard reviews as part of the PHA process. ii organized in the United Kingdom (UK), with contributions from regulators including the UK’s Health and Safety Executive (HSE),iii as well as other entities,iv developed a document in 2008v that provides guidance on damage mechanism hazard reviews in the UK’s offshore petrochemical industry. The guidance states that effective management of corrosion will contribute to equipment integrity and reduce risk from safety and environmental hazards.72 In addition, during the design of a process, a corrosion review can be used to eliminate risks and achieve inherent safety.73

i This is also the case for US EPA Risk Management Program and the California Accidental Release Prevention Program regulations. The guidance also iiThe Energy Institute is the leading chartered professional membership body supporting individuals and organizations across the energy industry. With a combined membership of over 13,500 individuals and 300 companies in 100 countries, it provides an independent focal point for the energy community and a powerful voice to engage business and industry, government, academia and the public internationally. See http://www.energyinst.org/about-us (accessed April 17, 2013). iii HSE is an independent regulator that is tasked with securing the health, safety and welfare of workers within the UK. See http://www.hse.gov.uk/aboutus/index.htm (accessed April 17, 2013). iv Chevron Energy Technology Company (ETC) was one of roughly 30 entities recognized in the guidance document as providing contributions to the institute that were “key to the development of this publication…”. See http://www.energyinstpubs.org.uk/pdfs/815.pdf (accessed April 17, 2013). v Ibid.

Chevron Richmond Refinery Interim Investigation Report April 2013

49 U.S. CHEMICAL SAFETY AND HAZARD INVESTIGATION BOARD notes that damage mechanism hazard reviews should provide a structured framework for identifying risks associated with corrosion and developing suitable risk reduction measures.74 These reviews should cover failure mechanisms including, but not limited to corrosion, environmental cracking, erosion, and mechanical damage, such as vibration induced fatigue.75 Finally, this guidance states that a formal, documented quantitative and logic based assessment should be used when conducting corrosion reviews.76

  1. Under a rule issued by the U.S. Environmental Protection Agency (EPA),

77 a facility with a tank, drum, pipe, or other processi that contains an extremely hazardous toxic or flammable substance listed at 40 CFR §68.130 in an amount above the “threshold quantity” specified for that substance, is required to conduct a hazard assessment as well as develop a prevention program and an emergency response program. These requirements are documented in a Risk Management Plan (RMP) that is submitted to EPA. Covered facilities must implement the RMP and update their RMPs periodically or when certain changes occur. The goal of EPA’s Risk Management Program is to prevent accidental releases of substances that can cause serious harm to the public and the environment from short-term exposures, and to mitigate the severity of releases that do occur.78

  1. The EPA RMP program provisions build on the planning and preparedness groundwork laid by

the Emergency Planning and Community Right-to-Know Act of 1986 (EPCRA). EPCRA establishes requirements for federal, state, and local governments, as well as industry, regarding emergency planning and “Community Right-to-Know” reporting on hazardous toxic chemicals. EPCRA “help[s] increase the public’s knowledge and access to information on chemicals at individual facilities, their uses, and releases into the environment.”

79 According to the U.S. EPA’s Chemical Emergency Preparedness and Prevention Office,ii Both EPCRA and the CAA [Clean Air Act] section 112(r) Risk Management Program encourage communication between facilities and the surrounding communities about chemical safety and chemical risks. Regulatory requirements, by themselves, will not guarantee safety from chemical accidents. Information about hazards in a community will allow local emergency officials and the public to work with industry to prevent accidents. transparency between industry and the public will improve community safety: 80

i “Process” means “any activity involving a regulated substance including any use, storage, manufacturing, handling, or on-site movement of such substances, or combination of these activities…” 40 CFR §68.3 (1997).

ii In 2004, the U.S. EPA’s Chemical Emergency Preparedness and Prevention Office was merged with the Superfund Emergency Response Program and Oil Spill Prevention Program to form the Office of Emergency Management, or OEM. OEM works with other EPA partners, federal, state, and local agencies, and industry to prevent accidents and maintain and provide superb response capabilities. See http://www.epa.gov/oem/about.htm (accessed April 17, 2013).

Chevron Richmond Refinery Interim Investigation Report April 2013

50 U.S. CHEMICAL SAFETY AND HAZARD INVESTIGATION BOARD The CCPS also notes that governments and advocacy organizations have been successful in driving performance improvement by using public disclosure to make safety information available to the public.81

  1. Under the RMP program’s hazard assessment requirement, a facility must prepare a worst-case

release scenario analysis

82 and complete a five-year accident history.83 A covered facility must also develop and implement an emergency response program that includes procedures for informing the public and local agencies about accidental releases and procedures and measures for emergency response after an accidental release.84

  1. Workforce involvement is a key element of process safety and effective chemical accident

prevention. In the Center for Chemical Process Safety publication, Guidelines for Risk Based Process Safety, it lists workforce involvement as one of 20 essential management systems necessary to reduce process safety risks and prevent chemical accidents. Officials and the public, including local emergency planning committees (LEPCs) can use this information to understand the chemical hazards in the community and then work with industry to address and mitigate those hazards. With both EPCRA and the Risk Management Program, the regulatory purpose and substantive provisions emphasize the importance of transparency, sharing of process safety data, and public participation to prevent chemical accidents. The CSB notes that post-incident, during the decision-making related to piping repairs to the crude unit, the public, worker representatives, regulators, and governmental bodies played a key role driving transparency, accountability, and improved risk reduction. 85 …workers are potentially the most knowledgeable people with respect to the day-to-day details of operating the process and maintaining the equipment and facilities and may be the sole source for some types of knowledge gained through their unique experiences. Workforce involvement provides management a mechanism for tapping into this valuable expertise. CCPS states that: 86 This CCPS publication discusses general areas of workforce involvement in risk assessments, inspections, audits, and performance reviews. The CCPS notes that participation leads to empowerment, management responsiveness, and process safety performance improvement.

87 The OSHA PSM Standard emphasizes the importance of participation by workers and their representatives. It requires employers to develop a written plan of action, consult with employees, and make available all process safety information. 88 In previous investigation reports, the CSB has identified that workers and their representatives play a very important role in major incident prevention. For example, in the BP Texas City oil refinery investigation report, the CSB recommended that BP and the United Steelworkers International Union (USW) establish a joint program to report incidents and near misses, and to ensure that recommendations made during investigations were implemented. The CSB also recommended

Chevron Richmond Refinery Interim Investigation Report April 2013

51 U.S. CHEMICAL SAFETY AND HAZARD INVESTIGATION BOARD that API and the USW work together to develop a safety standard addressing leading and lagging process safety indicators. i

  1. In July 2012, the CSB held a public hearing on process safety indicators

ii to explore how companies and regulators use process safety metrics to manage risks and drive continuous safety improvements. During this hearing the CSB stated that, following the 2005 BP Texas City accident, both the CSB and Baker Paneliii

  1. Process safety management systems are critical for reducing process safety incidents. Process

safety indicators are a significant element of these systems. Indicators measure the strengths and weaknesses of process safety management systems, to achieve and maintain safe and reliable operations. reports noted the lack of focus by BP on process safety and inadequate performance measurement indicators. The CSB also noted that one goal of process safety indicators is to drive continuous process safety improvement, and that regulators can utilize these indicators to focus inspections, audits, and investigations. 89 Properly selected and managed indicators will identify the successes and point out the flaws of the system.90

  1. In 2008, the CCPS published a guidance document for the development of leading

iv and laggingv process safety indicators to assist industry in avoiding catastrophic chemical incidents.91 While process safety indicators are an important tool for major accident prevention, the simple activity of identifying and recording process safety metrics will not drive process safety improvement. CCPS notes that these metrics must be “collected, analyzed, communicated, understood, and acted upon.”92

  1. The UK HSE has published a guidance document to help chemical and major hazard industries

develop process safety indicators. HSE states that:

Most systems and procedures deteriorate over time, and system failures discovered following a major incident frequently surprise senior managers, who sincerely believed that the controls were functioning as designed. Used effectively, process

i Process safety indicators are also referred to as safety performance indicators, metrics, key process indicators (KPI), performance measures, indicators, etc… ii See http://www.csb.gov/assets/1/19/CSB_20Public_20Hearing.pdf (accessed April 17, 2013). iii See http://www.bp.com/liveassets/bp_internet/globalbp/globalbp_uk_english/SP/STAGING/local_assets/assets/pd fs/Baker_panel_report.pdf (accessed April 12, 2013). iv Leading indicators are measurements that predict future performance to ensure that safety protection layers and operating discipline are being maintained, including unsafe behaviors or insufficient operating discipline equipment selection, engineering design, specification of inspection frequency, and technique. See Center for Chemical Process Safety (CCPS), Guidelines for Process Safety Metrics, Page 20. 2010. v Lagging indicators are facts about previous events, such as process safety incidents, that meet the threshold of severity and should be reported as part of the process safety metric. See Center for Chemical Process Safety (CCPS), “Guidelines for Process Safety Metrics,” 2010; Page 20.

Chevron Richmond Refinery Interim Investigation Report April 2013

52 U.S. CHEMICAL SAFETY AND HAZARD INVESTIGATION BOARD safety indicators can provide an early warning, before catastrophic failure, that critical controls have deteriorated to an unacceptable level. 93

  1. The public can play an important role in monitoring safety management systems. In its recent

guidelines, the CCPS promoted the sharing of process safety indicators with the public:

Sharing performance metrics and results broadly can engage the public as a partner in holding the organization accountable for process safety performance. Making metrics and performance public can be an especially powerful way of maintaining upper management commitment since it will likely be the CEO or other senior managers who will be called to account by the public if goals are not met or performance declines. Communicating process safety successes also demonstrates to employees and the public that positive change can be, and are being, made within an organization. 94

Chevron Richmond Refinery Interim Investigation Report April 2013

53 U.S. CHEMICAL SAFETY AND HAZARD INVESTIGATION BOARD Recommendations Under 42 U.S.C. 7412(r)(6)(C)(ii), the U.S. Chemical Safety and Hazard Investigation Board is charged with “recommending measures to reduce the likelihood or the consequences of incidental releases and proposing corrective steps to make chemical production, processing, handling and storage as safe and free from risk of injury as possible ….” The CSB makes recommendations based on the findings and conclusions of the investigation. Recommendations are made to parties that can affect change to prevent future incidents, which may include the company, contractors, industry organizations responsible for developing good practice guidelines, regulatory bodies, and/or organizations that have the ability to broadly communicate lessons learned from the incident, such as trade associations or professional societies. Chevron U.S.A (Urgent) 2012-03-I-CA-R1 At all Chevron U.S. refineries, engage a diverse team of qualified personnel to perform a documented damage mechanism hazard review. This review shall be an integral part of the Process Hazard Analysis cycle and shall be conducted on all PSM-covered process piping circuits and process equipment. The damage mechanism hazard review shall identify potential process damage mechanisms and consequences of failure, and shall ensure safeguards are in place to control hazards presented by those damage mechanisms. Analyze and incorporate into this review applicable industry best practices, Chevron Energy Technology Company findings and recommendations, and inherently safer systems to the greatest extent feasible. 2012-03-I-CA-R2 At all California Chevron U.S. refineries, report leading and lagging process safety indicators, such as the action item completion status of recommendations from damage mechanism hazard reviews, to the federal, state, and local regulatory agencies that have chemical release prevention authority.

Chevron Richmond Refinery Interim Investigation Report April 2013

54 U.S. CHEMICAL SAFETY AND HAZARD INVESTIGATION BOARD Mayor and City Council, City of Richmond, California 2012-03-I-CA-R3 Revise the Industrial Safety Ordinance (ISO) to require that Process Hazard Analyses include documentation of the recognized methodologies, rationale and conclusions used to claim that safeguards intended to control hazards will be effective. This process shall use established qualitative, quantitative, and/or semi-quantitative methods such as Layers of Protection Analysis (LOPA). 2012-03-I-CA-R4 Revise the Industrial Safety Ordinance (ISO) to require the documented use of inherently safer systems analysis and the hierarchy of controls to the greatest extent feasible in establishing safeguards for identified process hazards. The goal shall be to drive the risk of major accidents to As Low As Reasonably Practicable (ALARP). Include requirements for inherently safer systems analysis to be automatically triggered for all Management of Change and Process Hazard Analysis reviews, prior to the construction of new processes, process unit rebuilds, significant process repairs, and in the development of corrective actions from incident investigation recommendations. 2012-03-I-CA-R5 Ensure the effective implementation of the damage mechanism hazard review program (2012-03-I-CA- R1 and 2012-03-I-CA-R2), so that all necessary mechanical integrity work at the Chevron Richmond Refinery is identified and recommendations are completed in a timely way.

Chevron Richmond Refinery Interim Investigation Report April 2013

55 U.S. CHEMICAL SAFETY AND HAZARD INVESTIGATION BOARD Board of Supervisors Contra Costa County, California 2012-03-I-CA-R6 Revise the Industrial Safety Ordinance (ISO) to require that Process Hazard Analyses include documentation of the recognized methodologies, rationale and conclusions used to claim that safeguards intended to control hazards will be effective. This process shall use established qualitative, quantitative, and/or semi-quantitative methods such as Layers of Protection Analysis (LOPA). 2012-03-I-CA-R7 Revise the Industrial Safety Ordinance (ISO) to require the documented use of inherently safer systems analysis and the hierarchy of controls to the greatest extent feasible in establishing safeguards for identified process hazards. The goal shall be to drive the risk of major accidents to As Low As Reasonably Practicable (ALARP). Include requirements for inherently safer systems analysis to be automatically triggered for all Management of Change and Process Hazard Analysis reviews, prior to the construction of new processes, process unit rebuilds, significant process repairs, and in the development of corrective actions from incident investigation recommendations. 2012-03-I-CA-R8 Monitor and confirm the effective implementation of the damage mechanism hazard review program (2012-03-I-CA-R1 and 2012-03-I-CA-R2), so that all necessary mechanical integrity work at the Chevron Richmond Refinery is identified and recommendations are completed in a timely way.

Chevron Richmond Refinery Interim Investigation Report April 2013

56 U.S. CHEMICAL SAFETY AND HAZARD INVESTIGATION BOARD California State Legislature, Governor of California 2012-03-I-CA-R9 Revise the California Code of Regulations, Title 8, Section 5189, Process Safety Management of Acutely Hazardous Materials, to require improvements to mechanical integrity and process hazard analysis programs for all California oil refineries. These improvements shall include engaging a diverse team of qualified personnel to perform a documented damage mechanism hazard review. This review shall be an integral part of the Process Hazard Analysis cycle and shall be conducted on all PSM-covered process piping circuits and process equipment. The damage mechanism hazard review shall identify potential process damage mechanisms and consequences of failure, and shall ensure safeguards are in place to control hazards presented by those damage mechanisms. Require the analysis and incorporation of applicable industry best practices and inherently safety systems to the greatest extent feasible into this review. 2012-03-I-CA-R10 For all California oil refineries, identify and require the reporting of leading and lagging process safety indicators, such as the action item completion status of recommendations from damage mechanism hazard reviews, to state and local regulatory agencies that have chemical release prevention authority. These indicators shall be used to ensure that requirements described in 2012-03-I-CA-R9 are effective at improving mechanical integrity and process hazard analysis performance at all California oil refineries and preventing major chemical incidents.

2012-03-I-R11 Establish a multi-agency process safety regulatory program for all California oil refineries to improve the public accountability, transparency, and performance of chemical accident prevention and mechanical integrity programs. This program shall:

  1. Establish a system to report to the regulator the recognized methodologies, findings, conclusions

and corrective actions related to refinery mechanical integrity inspection and repair work arising from Process Hazard Analyses, California oil refinery turnarounds and maintenance-related shutdowns;

  1. Require reporting of information such as damage mechanism hazard reviews, notice of upcoming

maintenance-related shutdowns, records related to proposed and completed mechanical integrity work lists, and the technical rationale for any delay in work proposed but not yet completed;

Chevron Richmond Refinery Interim Investigation Report April 2013

57 U.S. CHEMICAL SAFETY AND HAZARD INVESTIGATION BOARD

  1. Establish procedures for greater workforce and public participation including the public reporting

of information; and

  1. Provide mechanisms for federal, state and local agency operational coordination, sharing of data

(including safety indicator data), and joint accident prevention activities. The California Department of Industrial Relations will be designated as the lead state agency for establishing a repository of joint investigative and inspection data, coordinating the sharing of data and joint accident prevention activities. 2012-03-I-CA-R12 Require that Process Hazard Analyses required under California Code of Regulations, Title 8, Section 5189 Section (e) include documentation of the recognized methodologies, rationale and conclusions used to claim that safeguards intended to control hazards will be effective. This process shall use established qualitative, quantitative, and/or semi-quantitative methods such as Layers of Protection Analysis (LOPA). 2012-03-I-CA-R13 Require the documented use of inherently safer systems analysis and the hierarchy of controls to the greatest extent feasible in establishing safeguards for identified process hazards. The goal shall be to drive the risk of major accidents to As Low As Reasonably Practicable (ALARP). Include requirements for inherently safer systems analysis to be automatically triggered for all Management of Change and Process Hazard Analysis reviews, prior to the construction of new process, process unit rebuilds, significant process repairs and in the development of corrective actions from incident investigation recommendations. 2012-03-I-CA-R14 Monitor and confirm the effective implementation of the damage mechanism hazard review program (2012-03-I-CA-R9 and 2012-03-I-CA-R10), so that all necessary mechanical integrity work at all California Chevron Refineries is identified and recommendations are completed in a timely way.

Chevron Richmond Refinery Interim Investigation Report April 2013

58 U.S. CHEMICAL SAFETY AND HAZARD INVESTIGATION BOARD The U.S. Environmental Protection Agency 2012-03-I-CA-R15 Jointly plan and conduct inspections with Cal/OSHA, California EPA and other state and local regulatory agencies with chemical accident prevention responsibilities to monitor the effective implementation of the damage mechanism hazard review and disclosure requirements under 2012-03-I-CA-R9 and R10 above.

The Board of Supervisors, Contra Costa County, California, 2012-03-I-CA-R16; The Mayor and City Council, City of Richmond, California, 2012-03-I-CA-R17; The California Air Quality Management Divisions, 2012-03-I-CA-R18; The U.S. Environmental Protection Agency, 2012-03-I-CA-R19; and The California Environmental Protection Agency, 2012-03-I-CA-R20;

Participate in the joint regulatory program described in recommendation 2012-03-I-CA-R11. This participation shall include contributing relevant data to the repository of investigation and inspection data created by the California Department of Industrial Relations and jointly coordinating activities.

Chevron Richmond Refinery Interim Investigation Report April 2013

59 U.S. CHEMICAL SAFETY AND HAZARD INVESTIGATION BOARD Additional Issues Currently Under Investigation The following section highlights additional issues which the CSB has identified to date in its investigation of the Chevron Richmond Refinery fire and major hydrocarbon release that occurred on August 6, 2012. These issues relate to the ongoing CSB investigation of the management and regulation of health and safety at refineries. The CSB final report will make additional recommendations consistent with this interim report and will present additional detailed findings and analyses in a final report on the incident, to be released later in 2013. Regulatory Oversight The CSB noted in its BP Texas City (BPTC) Final Investigation Report (issued in March 2007) the importance of having a well-resourced, competent regulator consisting of individuals with the necessary training, education, and experience to conduct planned comprehensive and robust inspections of facilities with the goal of preventing catastrophic accidents. In a 1992 compliance directivei the federal Occupational Safety and Health Administration (OSHA) stated that the primary enforcement model for the Process Safety Management of Highly Hazardous Chemicals (PSM) standard would be planned, comprehensive, and resource-intensive Program Quality Verification (PQV) inspections to help prevent catastrophic accidents.95 Spurred in part by the CSB’s recommendations, OSHA issued the Petroleum Refinery Process Safety Management National Emphasis Program (NEP) on June 7, 2007. However, the CSB report noted that for the 10-year period prior to the Texas City incident, federal OSHA had conducted no planned PQV inspections in oil refineries. Regular planned inspections appropriately emphasize the prevention of accidents that are potentially catastrophic. Issuing fines and prosecuting companies post-incident are not acceptable substitutes for prevention. As a result, CSB recommended in its report that OSHA strengthen the planned enforcement of the OSHA Process Safety Management (PSM) standard by developing more highly trained and experienced inspectors to conduct more comprehensive inspections similar to those under OSHA’s PQV program at facilities presenting the greatest risk of a catastrophic accident. ii The NEP was a federal program that established guidelines for inspecting petroleum refineries to assure compliance with the PSM standard, 29 CFR §1910.119.96 Unlike the PQV approach to inspections, which “employs a broad, open-ended inspection strategy and uses a more global approach to identify compliance deficiencies…,”97 the NEP “provide[d] a specific tool to evaluate compliance with the [PSM] standard…[which] identifies a particular set of requirements from the PSM standard from which CSHOs [Compliance Safety and Health Officers] are to review documents, interview employees, and verify implementation for specific processes, equipment, and procedures.”98

i Compliance directives are the main method OSHA uses to communicate plans, inspection methods, and compliance expectations to their Compliance Safety and Health Officers (CSHOs) for enforcing a new regulation. While the CSB called for an ongoing comprehensive inspection ii Originally Directive Number CPL 03-00-004. Extended August 18, 2099 as Directive Number CPL 03-00-010 to allow more time to complete NEP inspections under the original CPL 03-00-004.

Chevron Richmond Refinery Interim Investigation Report April 2013

60 U.S. CHEMICAL SAFETY AND HAZARD INVESTIGATION BOARD program, inspections being conducted pursuant to the NEP were terminated in 2011. The CSB recommendation to OSHA remains Open.i OSHA State Plan States

ii were strongly encouraged but not required to implement the NEP. California’s Division of Occupational Safety and Health (Cal/OSHA) did not adopt the NEP “because of its dedicated PSM Unit.”99 Cal/OSHA informed the CSB that federal OSHA approved this decision in 2007. In lieu of conducting NEP inspections, Cal/OSHA’s PSM Unit has conducted and continues to conduct a full range of programmed, accident, complaint, and referral inspections of PSM-covered facilities in the state of California pursuant to the California Labor Code, Title 8 regulations, and Cal/OSHA’s Policy and Procedures (P&P) Manual C-17 “Process Safety Management,”iii Between 2006 and August 6, 2012, Cal/OSHA conducted three planned inspections of the Chevron Richmond facility, totaling only 150 inspector hours of effort. None of these inspections resulted in citations or fines. In contrast, according to statistics provided by OSHA, federal NEP refinery inspections conducted between 2007 and the end of 2011 lasted roughly 1,000 inspector hours each and resulted in an average of 11.2 violations and $76,821 in penalties per inspection. OSHA noted that hours spent on a typical federal refinery NEP inspection were 40 times greater than the average OSHA inspection. These numbers indicate a major disparity in thoroughness and comprehensiveness between the planned inspections conducted by Cal/OSHA and the NEP inspections conducted by OSHA and other OSHA State Plan States. to ensure these facilities are complying with PSM requirements. The safety case is a rigorous prescriptive and goal-setting regulatory regime that is highlighted by its adaptability and requirements for continuous improvements in risk reduction for high hazard industrial facilities. The approach is used widely overseas but is not used currently for U.S. process industries. The CSB is currently examining whether the implementation of the safety case regime could be a more effective regulatory tool for Cal/OSHA in its effort to ensure that California refineries are identifying and controlling hazards and ultimately driving risk to as low as reasonably practicable (ALARP). Utilizing the safety case requires effective implementation by an independent, competent, well-funded regulator. Experience and competence of the regulator in technical areas such as chemical engineering, human factors, and process safety are necessary to provide effective auditing and regulatory oversight for prevention. To ensure effective implementation of the safety case, industry standards and guidelines must be rigorous and up-to-date as well. The CSB notes that relevant and applicable industry standards and guidelines – such as API RP 939-C – currently contain voluntary and permissive language. The CSB will be examining the need for more effective good practice standards and guidelines containing the necessary requirements to prevent catastrophic accidents.

i Open - Awaiting Response or Evaluation/Approval of Response (O - ARE/AR) - The recipient has not submitted a substantive response, or the evaluation by CSB staff of a response is pending, or the Board has not yet acted on staff recommendation of status. ii Section 18 of the Occupational Safety and Health Act of 1970 encourages States to develop and operate their own job safety and health programs, referred to informally as an OSHA State Plan. OSHA approves and monitors State plans and provides up to 50 percent of an approved plan's operating costs. iii Issued June 6, 1994. Revised August 1, 1994 and May 19, 2007.

Chevron Richmond Refinery Interim Investigation Report April 2013

61 U.S. CHEMICAL SAFETY AND HAZARD INVESTIGATION BOARD In addition to the issues discussed above, the CSB will also be examining the need for the reporting of leading and lagging process safety indicators to the regulator; the regulator’s effective use of these process safety indicators; workforce and stakeholder involvement in regulatory oversight of refineries; and the thoroughness of Contra Costa County’s safety auditing of the Chevron facility. Emergency Planning and Reporting According to information provided by Contra Costa Emergency Medical Services, 15,213 individuals sought emergency medical attention between August 6 and August 23, 2012, due to the Chevron refinery major hydrocarbon release and fire. CSB Investigation Team members visited local hospitals the week of the incident to better understand the impact on the surrounding community. Officials at Doctor’s Medical Center (DMC) in San Pablo, California, informed the CSB that in the days following the incident they were inundated with emergency room visits and found it difficult to handle the influx due to a lack of funding and staffing. Officials at both DMC and Kaiser Permanente Hospital (KP) in Richmond told the CSB that they lacked specific knowledge of the chemicals released as a result of the incident, complicating efforts to evaluate and treat individuals. The California Code of Regulations (CCR) requires that owners and operators of hazardous waste facilities make “arrangements to familiarize local hospitals with the properties of hazardous waste handled at the facility and the types of injuries or illnesses which could results from fires, explosions, or releases at the facility.”100 Following the incident, Contra Costa County’s Community Warning System (CWS) notified the surrounding community of a hazardous material incident and ordered a shelter-in-place (SIP). The CWS uses sirens, the news media, and phone calls to residents in order to initiate the SIP. Contra Costa County issued the SIP on August 6, 2012, at 6:38 pm for the cities of Richmond, San Pablo, and North Richmond, California, and lifted the SIP later that evening at 11:12 pm. However, the CSB has learned that some phone calls notifying residents of the SIP did not occur until over four hours after the release. The CSB is currently evaluating ways to ensure that hospitals have the information necessary to properly evaluate and treat individuals that may be exposed to releases from facilities in Contra Costa County. It is essential that responders, community residents, and hospitals in the areas surrounding industrial facilities be aware of what hazardous materials exist at these facilities, what specific chemicals are released into the community in the event of an incident, and what is known about the potential acute and chronic health impacts. The CSB will be analyzing ways to strengthen current regulations and policies to ensure there is proper emergency planning and reporting for industrial facilities in Contra Costa County and the state of California.

Chevron Richmond Refinery Interim Investigation Report April 2013

62 U.S. CHEMICAL SAFETY AND HAZARD INVESTIGATION BOARD Emergency Response OSHA provides guidance on emergency response in its Hazardous Waste Operations and Emergency Response standard, known as HAZWOPER, under 29 CFR §1910.120 (p) and (q). Under 29 CFR §1910.120(q)(6), the HAZWOPER standard contains requirements for training and qualification of all individuals involved in emergency response related to their roles and responsibilities. Good safety practice dictates that individuals responding to emergencies should have the technical knowledge to give input into shutdown decisions, set up an incident command structure, establish boundary limits, and evaluate the “hot zone.” Access to the hot zone must be strictly limited to personnel with higher degrees of specific training, experience, and appropriate personal protective equipment; all others must be removed to a safe location away from chemical hazards. Hot zone boundaries must be established to anticipate the possible escalation of releases and the positioning of firefighting equipment such as fire trucks. The CSB will be looking at the sufficiency of regulatory requirements, industry standards, and good practices, in addition to evaluating emergency response decision-making following the leak and subsequent pipe rupture (including the training and qualification of responders) to determine whether improvements are needed in these areas. Safety Culture The Center for Chemical Process Safety (CCPS) defines process safety culture as the “combination of group values and behaviors that determines the manner in which process safety is managed.”101 The CSB notes that on August 6, 2012, following discovery of the leak on the 4-sidecut piping, Chevron hoped to forestall a shutdown by installing a leak repair clamp. As the CSB noted in its BP Texas City Report, safety culture can be influenced by management changes, historical events, and economic pressures. After reviewing evidence and decisions made relating to materials of construction and mechanical integrity within the crude unit at the Chevron refinery, as well as the response to the leak on August 6, 2012, the CSB has determined that issues relating to safety culture are relevant to this incident. The CSB will examine the Chevron Richmond Refinery’s approach to safety, its safety culture and any organizational deficiencies, to determine how to best prevent future incidents. i Chevron’s mechanical integrity management system has not been fully successful in detecting and replacing deteriorated piping components prior to failure, resulting in the company’s frequent use of leak repair clampsii

i Chevron’s leak repair clamp vendor was called out to the scene of the leak to help determine potential clamping options. to externally stop process fluid leaks. Chevron’s reliance on such clamps to mitigate process piping component leaks identifies serious questions about its mechanical integrity program. The CSB determined that Chevron ii Leak repair clamps are mechanical devices designed and installed to stop a leak from a piping component such as piping, valves, flanges, and instrumentation. These devices are typically intended to provide a temporary repair while a process continues operation until a plant shutdown takes place and a permanent repair can be made.

Chevron Richmond Refinery Interim Investigation Report April 2013

63 U.S. CHEMICAL SAFETY AND HAZARD INVESTIGATION BOARD has more than 100 clamps on hydrocarbon and other process piping components at the Richmond refinery. The leak repair clamp is typically relied upon to prevent further leaking until the next unit turnaround, when the deteriorated piping component can be repaired. However, Cal/OSHA citations following the August 6, 2012, fire in the crude unit identified that Chevron has not always replaced these clamps during unit turnarounds and these devices then remain in service significantly longer than originally intended. The CSB determined that Chevron has leak repair clamps in place on piping components containing hazardous flammable process fluids including applications where the process material is above the autoignition temperature. Some of these leak repair clamp applications are in locations where a permanent repair would not have required a unit shutdown. The CSB will further evaluate the frequent use of leak repair clamps by Chevron and the potential that the deviance of a weak mechanical integrity management system has been normalized.i

i Normalization of deviance is a long-term phenomenon in which individuals or work teams gradually accept a lower standard of performance until the lower standard becomes the norm. It is typically the result of conditions slowly changing and eroding over time. See Center for Chemical Process Safety (CCPS), Recognizing Catastrophic Incident Warning Signs in the Process Industries, Page 4. 2012.

Chevron Richmond Refinery Interim Investigation Report April 2013

64 U.S. CHEMICAL SAFETY AND HAZARD INVESTIGATION BOARD BY THE U.S. Chemical Safety and Hazard Investigation Board

Rafael Moure-Eraso

Chair

Mark Griffon

Member

Beth Rosenberg

Member

Date of Approval April __, 2013.

Chevron Richmond Refinery Interim Investigation Report April 2013

65 U.S. CHEMICAL SAFETY AND HAZARD INVESTIGATION BOARD References

video-of-smoke/vdCJ7/ (accessed April 10, 2013).

Unit 8-Inch and 12-Inch 4-Sidecut Piping Involved in the August 6, 2012, Hydrocarbon Release and Fire." Prepared for: The Chemical Safety and Hazard Investigation Board (CSB), February 11, 2013.

1st ed., Section 4, May 2009.

International Publication 34103. Item No. 24222, 2004.

1st ed., May 2009.

Coated, Welded and Seamless." 2012.

Sulfidation Corrosion in Refining." 17th International Corrosion Congress. Las Vegas: NACE International, 2008.

1st ed., Section 6.2.3.2, May 2009.

Coated, Welded and Seamless." 2012.

Temperature Service." 2011.

Coated, Welded and Seamless." 2012.

Chevron Richmond Refinery Interim Investigation Report April 2013

66 U.S. CHEMICAL SAFETY AND HAZARD INVESTIGATION BOARD

Crude Unit 8-Inch and 12-Inch 4-Sidecut Piping Involved in the August 6, 2012, Hydrocarbon Release and Fire." Prepared for: The Chemical Safety and Hazard Investigation Board (CSB), February 11, 2013.

1st ed., Section 7.1.5, May 2009.

April 2011.

Assessment.” 2001.

Inspection Number 314331877, CSHO ID A0572, Citation 4 Item 1, January 30, 2013.

February 14, 2013).

1st ed., Section 4, May 2009.

Systems." 3rd ed., Section 4.3.1.2, November 2009.

Approach.” 2nd ed., Section 2.2, 2009. Chevron Richmond Refinery Interim Investigation Report April 2013

67 U.S. CHEMICAL SAFETY AND HAZARD INVESTIGATION BOARD

ed., Section 1.1, Page 14, 2010.

1st ed., May 2009.

Approach.” 2nd ed., Page 21, 2009.

http://www.ci.richmond.ca.us/archives/66/113%20N.S.%20amending%20Richmond%20Municipal %20Code%20Chapter%206.43%20to%20improve%20industrial%20safety-conformed.pdf (accessed April 11, 2013).

18, 2001. http://www.ci.richmond.ca.us/archives/66/113%20N.S.%20amending%20Richmond%20 Municipal%20Code%20Chapter%206.43%20to%20improve%20industrial%20safety-conformed.pdf (accessed April 11, 2013).

Hazardous Materials and Wastes. Chapter 450-8: Risk Management. Section 450-8.014 “Definitions” (2010). http://library.municode.com/index.aspx?clientId=16286 (accessed February 15, 2013). See also City of Richmond Municipal Code §6.43.050(g) (February 5, 2013).

Richmond Municipal Code §6.43.090(d)(3) (February 5, 2013). Chevron Richmond Refinery Interim Investigation Report April 2013

68 U.S. CHEMICAL SAFETY AND HAZARD INVESTIGATION BOARD

Analysis / Action Items. Subpart D.1.3. Process Hazard Analysis Recommendations and Mitigations. Published June 15, 2011. http://cchealth.org/hazmat/pdf/iso/section_d.pdf (accessed March 20, 2013).

Hazardous Materials http://www.dir.ca.gov/title8/5189.html (accessed February 15, 2013).

Safety of the American Institute of Chemical Engineers. 2001.

Section 1.1, May 2008.

Chemical Accident Prevention (40 CFR Part 68).” Page i. March 2009. http://www.epa.gov/oem/docs/chem/Intro_final.pdf (accessed April 3, 2013).

Chevron Richmond Refinery Interim Investigation Report April 2013

69 U.S. CHEMICAL SAFETY AND HAZARD INVESTIGATION BOARD

Other Local Agencies Can Include Information from Risk Management Plans in Their Ongoing Work.” November 1999. http://www.epa.gov/osweroe1/docs/chem/lepc-rmp.pdf (accessed April 17, 2013).

http://www.aiche.org/ccps/resources/overview/process-safety-metrics/recommended-process-safety- metrics (accessed April 12, 2013). 92.Center for Chemical Process Safety (CCPS), Guidelines for Process Safety Metrics, Page 97. 2010. 93.Health and Safety Executive (HSE), Developing Process Safety Indicators a Step-by-Step Guide for Chemical and Major Hazard Industries, HSE Guidance Series/HSG Series, HSG254, Page 4. 2006. 94.Center for Chemical Process Safety (CCPS), Guidelines for Process Safety Metrics, Page 109. 2010.

  1. OSHA Instruction CPL 02-02-045 (1992). Updated in 1994.
  2. CPL 03-00-004, Section VII. Federal Program Change. 2007.
  3. Ibid at Section X(D)(1).
  4. Ibid.
  5. Department of Industrial Relations, Division of Occupational Safety and Health, California, Process

Safety Management District Office. “Mission Statement: Goals Reached in 2011 & Strategic Plan for 2012.”

  1. 22 CCR §66265.32(a)(4)(2004).

Chevron Richmond Refinery Interim Investigation Report April 2013

70 U.S. CHEMICAL SAFETY AND HAZARD INVESTIGATION BOARD

FD06451 | 2012_美国_Chevron Richmond 炼油厂 火灾 - Chevron Richmond Refinery Fire__最终报告_3.pdf

分类:06_境外及港澳台调查报告 | 年份:2012 | 地域: | 严重程度: | 场所:化工/石化 | 起火原因: | 来源格式:pdf

U.S. CHEMICAL SAFETY AND HAZARD INVESTIGATION BOARD

REGULATORY REPORT

REPORT NO. 2012-03-I-CA DECEMBER 2013 DRAFT FOR PUBLIC COMMENT CHEVRON RICHMOND REFINERY PIPE RUPTURE AND FIRE

CHEVRON RICHMOND REFINERY #4 CRUDE UNIT RICHMOND, CALIFORNIA AUGUST 6, 2012

Chevron Richmond Refinery Regulatory Report December 2013

2 DRAFT FOR PUBLIC COMMENT

Chevron Richmond Refinery Regulatory Report December 2013

3 DRAFT FOR PUBLIC COMMENT Table of Contents Table of Contents .......................................................................................................................................... 3  Acronyms and Abbreviations ....................................................................................................................... 5  1.0  Executive Summary ......................................................................................................................... 7  1.1  Incident Summary ............................................................................................................................ 7  1.2  Interim Report .................................................................................................................................. 7  1.3  Background ...................................................................................................................................... 9  1.4  Key Findings .................................................................................................................................. 10  1.5  Regulatory Conclusions ................................................................................................................. 12  1.6  Recommendations .......................................................................................................................... 13  2.0  Introduction .................................................................................................................................... 14  3.0  The Safety Case Regulatory Regime ............................................................................................. 20  3.1  Introduction .................................................................................................................................... 20  3.2  Initial Safety Case Implementation ................................................................................................ 21  3.2.1  United Kingdom .................................................................................................................... 21  3.2.1.1  Onshore .......................................................................................................................... 21  3.2.1.2  Offshore ......................................................................................................................... 23  3.2.2  Global Analysis of Safety Case Implementation .................................................................. 26  3.2.2.1  Australia ........................................................................................................................ 26  3.2.2.1.1  Offshore ................................................................................................................. 26  3.2.2.1.2  Onshore .................................................................................................................. 27  3.2.2.2  Norway .......................................................................................................................... 27  3.2.2.3  The United States........................................................................................................... 28  3.2.2.3.1  OSHA PSM Standard ............................................................................................ 29  3.2.2.3.2  U.S. Environmental Protection Agency Risk Management Program .................... 32  3.2.2.3.3  Safety Case in the United States ............................................................................ 34  4.0  Key Features of an Effective Safety Case Regulatory Regime ...................................................... 36  4.1  Duty Holder Safety Responsibility, including a Written Case for Safety ...................................... 37  4.2  Continuous Risk Reduction to ALARP ......................................................................................... 39  4.3  Adaptability and Continuous Improvement ................................................................................... 43  4.4  Active Workforce Participation ..................................................................................................... 51  4.5  Process Safety Indicators that Drive Performance ......................................................................... 55 

Chevron Richmond Refinery Regulatory Report December 2013

4 DRAFT FOR PUBLIC COMMENT 4.6  Regulatory Assessment, Verification, and Intervention ................................................................ 59  4.7  Independent, Competent, Well-Funded Regulator ........................................................................ 63  5.0  Oversight of Petroleum Refineries in California ........................................................................... 67  5.1  Cal/OSHA ...................................................................................................................................... 67  5.1.1  Background Information ....................................................................................................... 67  5.1.2  Analysis ................................................................................................................................. 73  5.1.2.1  ALARP .......................................................................................................................... 73  5.1.2.2  Adaptability and Continuous Improvement ................................................................... 75  5.1.2.3  Process Safety Indicators ............................................................................................... 77  5.1.2.4  Inspections ..................................................................................................................... 77  5.1.2.5  Workforce Participation ................................................................................................ 78  5.1.2.6  Funding and Regulator Competency ............................................................................. 80  5.2  U.S. Environmental Protection Agency ......................................................................................... 82  5.2.1  Risk Management Plan (RMP) Program ............................................................................... 82  5.2.2  Implementation of the RMP Program ................................................................................... 83  5.3  Unified Program ............................................................................................................................ 84  5.3.1.1  Contra Costa County Hazardous Materials Programs ................................................... 84  5.3.1.1.1  CalARP .................................................................................................................. 85  5.3.1.1.2  Industrial Safety Ordinance ................................................................................... 86  5.3.1.1.3  City of Richmond Industrial Safety Ordinance ..................................................... 87  5.3.1.2  Analysis ......................................................................................................................... 87  6.0  Conclusion ..................................................................................................................................... 89  7.0  Recommendations .......................................................................................................................... 90  References ................................................................................................................................................... 93  Appendix A: Significant Petroleum Refinery Incidents in 2012 ............................................................... 96  Appendix B: Regulatory Comparison Table ............................................................................................ 101  Appendix C: Frequently Asked Questions (FAQs) Regarding the Safety Case Regulatory Approach ... 104 

Chevron Richmond Refinery Regulatory Report December 2013

5 DRAFT FOR PUBLIC COMMENT Acronyms and Abbreviations ALARA

As Low As Reasonably Achievable ALARP

As Low As Reasonably Practicable ALJ

Administrative Law Judge ANPRM

Advance Notice of Proposed Rulemaking APA

Administrative Procedure Act API

American Petroleum Institute ASARP

As Safe As Reasonably Practicable AST

Aboveground Storage Tank BSEE

Bureau of Safety and Environmental Enforcement CA

Competent Authority CAA

Clean Air Act CAAA

Clean Air Act Amendments CalARP

California Accidental Release Prevention Cal/EPA

California Environmental Protection Agency Cal/OSHA

California Division of Occupational Safety and Health CCHMP

Contra Costa Health Services’ Hazardous Materials Program CCPS

Center for Chemical Process Safety CCR

California Code of Regulations CERCLA Comprehensive Environmental Response, Compensation, and Liability Act CFR

Code of Federal Regulations CIMAH

Control of Industrial Major Accident Hazards COMAH

Control of Major Accidents Hazards Regulations CSB

U.S. Chemical Safety and Hazard Investigation Board CSHO

Compliance Safety and Health Officer CUPA

Certified Unified Program Agency EA

Environment Agency EPA

U.S. Environmental Protection Agency ETC

Chevron Energy Technology Company FSA

Formal Safety Assessment FY

Fiscal Year GAO

U.S. Government Accountability Office HSC

California Health and Safety Code HSE

Health and Safety Executive HTHA

High Temperature Hydrogen Attack ISO

Industrial Safety Ordinance ISOM

Isomerization LOHP

Labor Occupational Health Program

Chevron Richmond Refinery Regulatory Report December 2013

6 DRAFT FOR PUBLIC COMMENT MOC

Management of Change MOOC

Management of Organizational Change NASA

National Aeronautics and Space Administration NEP

National Emphasis Program NOHSC

Australia National Occupational Health and Safety Commission NOPSEMA Australian National Offshore Petroleum Safety and Environmental Management Authority NPRM Notice of Proposed Rulemaking NRC U.S. Nuclear Regulatory Commission OERI Operational Excellence and Reliability Intelligence OIAC HSE Offshore Industry Advisory Committee OIG Office of Inspector General OMB Office of Management and Budget OSHA

U.S. Occupational Safety and Health Administration OSHAct

Occupational Safety and Health Act PHA

Process Hazard Analysis PHMSA Department of Transportation, Pipeline and Hazardous Materials Safety Administration PQV Program Quality Verification PSA Petroleum Safety Authority PSI Process Safety Information PSLA Petroleum Submerged Lands Act PSLG Process Safety Leadership Group PSM Process Safety Management RAGAGEP Recognized and Generally Accepted Good Engineering Practices RFI Request for Information RISC Risk-Informed Safety Case RISO City of Richmond Industrial Safety Ordinance RLOP Richmond Lube Oil Plant RMP Risk Management Plan RP Recommended Practice SEPA Scottish Environmental Protection Agency SFAIRP So Far As Is Reasonably Practicable SOP Standard Operating Procedure UK

United Kingdom USCG

U.S. Coast Guard USW

United Steelworkers Union WIG

Workforce Involvement Group

Chevron Richmond Refinery Regulatory Report December 2013

7 DRAFT FOR PUBLIC COMMENT 1.0 Executive Summary 1.1 Incident Summary On August 6, 2012, the Chevron U.S.A. Inc. Refinery in Richmond, California, (“the Chevron Richmond Refinery”) experienced a catastrophic pipe failure in the #4 Crude Unit (“the crude unit”). The pipe, a 52- inch long carbon steel piping component of the #4 sidecut line, ruptured and released flammable, hydrocarbon process fluid, which partially vaporized into a large vapor cloud that engulfed 19 Chevron employees and ignited. All of the employees escaped, narrowly avoiding serious injury. The ignition of the flammable portion of the vapor cloud and subsequent continued burning of the hydrocarbon process fluid resulted in a large plume of particulates and vapor traveling across the Richmond, California area. Approximately 15,000 people from the surrounding area sought medical treatment due to the release. 1.2 Interim Report The CSB released an Interim Report on the Chevron incident in April 2013 (“the Interim Report”), which highlighted technical findings and safety system deficiencies. Testing conducted on the ruptured pipe determined that it had experienced extreme thinning near the rupture location due to sulfidation corrosion.1 Sulfidation corrosion is a damage mechanism that causes thinning in iron-containing materials, such as steel, due to the reaction between sulfur compounds and iron at temperatures ranging from 450 °F to 800 °F.2 This damage mechanism3 causes pipe walls to gradually thin over time, and is common in crude oil distillation4 where naturally occurring sulfur and sulfur compounds found in crude oil feed, such as hydrogen sulfide,5 are available to react with steel piping and equipment. The Interim Report noted that virtually all crude oil feeds contain sulfur compounds and, as a result, sulfidation corrosion is a damage mechanism present at every refinery that processes crude oil. Sulfidation corrosion can cause thinning to the point of pipe failure when not properly monitored and controlled.

The Interim Report noted a number of causal safety system deficiencies that highlight regulatory gaps relating to major accident prevention at California petroleum refineries. For example, in conducting its process hazard analysis6 (PHA) of the crude unit, which was required under California’s Process Safety

1 Carbon steel piping corrodes at a rate that is significantly faster than other materials of construction, such as high chromium steels, including stainless steel. 2 For an electronic copy of the CSB Chevron Interim Report see http://www.csb.gov/assets/1/19/Chevron_Interim_Report_Final_2013-04-17.pdf (accessed October 24. 2013). 3 Piping damage mechanisms are any type of deterioration encountered in the refining and chemical process industry that can result in flaws/defects that can affect the integrity of piping (e.g. corrosion, cracking, erosion, dents, and other mechanical, physical or chemical impacts). See API 570. "Piping Inspection Code: In-Service Inspection, Rating, Repair, and Alteration of Piping Systems." 3rd ed., Section 3.1.1.5, November 2009. 4 Distillation separates mixtures into broad categories of its components by heating the mixture in a distillation column where different products boil off and are recovered at different temperatures. See http://www.eia.gov/todayinenergy/detail.cfm?id=6970 (accessed April 4, 2013). 5 Hydrogen sulfide is the most aggressive sulfur compound that causes sulfidation corrosion. 6 A process hazard analysis (PHA) is a hazard evaluation to identify, evaluate, and control the hazards of a process. Facilities that process a threshold quantity of hazardous materials, such as the Chevron Richmond refinery, are required to conduct a process hazard analysis per the California Code of Regulations Title 8 Section 5189, Process

Chevron Richmond Refinery Regulatory Report December 2013

8 DRAFT FOR PUBLIC COMMENT Management (PSM) standard,7 Chevron did not conduct a rigorous review of corrosion and damage mechanisms present in the crude unit, and did not identify sulfidation corrosion as a hazard. As such, Chevron did not effectively address inherent safety or implement effective controls to prevent sulfidation corrosion, including those controls proposed by Chevron’s technical group. Although both the California and federal PSM standards require that hazards be identified, evaluated, and controlled, there is no further discussion of how far to reduce risks, and there is no requirement to address the effectiveness of controls or to use the hierarchy of controls. Therefore, this type of analysis was not required to be conducted, and Chevron was never cited post-incident for failing to evaluate the effectiveness of safeguards.

In another example, despite internal recommendations to replace the entire #4 sidecut piping with an inherently safer, more corrosion-resistant material of construction through the Management of Change (MOC) process, incident investigations, technical reports, and employee recommendations, Chevron repeatedly failed to implement those proposed recommendations. Chevron’s 2006 MOC analysis limited application of those recommendations to only a small section of the pipe. As a result, the portion of the pipe that failed on the August 6th incident remained in service until the incident. As there is no requirement to implement effective recommendations or control hazards under the MOC element, it is essentially an activity-based requirement. Chevron was not cited for narrowing the scope of the MOC, despite its disregard of internal recommendations. The CSB concluded in its Interim Report that Chevron did not regularly or rigorously apply inherently safer technology, which provides an opportunity for preventing major accidents, in its PHAs, MOCs, incident investigation recommendations, or during turnarounds.

The CSB made safety recommendations in the Interim Report to a number of entities, including the California State Legislature, the U.S. Environmental Protection Agency, and Contra Costa County. The Board recommended that the California State Legislature require California petroleum refineries to perform damage mechanism hazard reviews, to identify and report leading and lagging process safety indicators, to document recognized methodologies, rationale, and conclusions used to claim that safeguards intended to control hazards will be effective, and to document their inherently safer systems analysis and the hierarchy of controls in establishing safeguards for process hazards, with the goal of driving risk of major accidents to as low as reasonably practicable, or ALARP. These concepts, introduced in the Interim Report and highlighted in the recommendations, are the basic building blocks for the implementation of the safety case regime, a regulatory scheme that will be discussed in great detail in the following report.

The CSB concluded its Interim Report by highlighting additional issues that were still under investigation, including emergency planning and reporting, emergency response, safety culture, and regulatory oversight of petroleum refineries in California. The following report fulfills the CSB’s commitment to examine whether the implementation of the safety case regulatory regime could be a more effective regulatory tool to achieve major accident prevention for California petroleum refineries. The reader will find additional issues, arguments, and counterarguments regarding the safety case regulatory regime addressed in Appendix C of this report.

Safety Management of Acutely Hazardous Materials (1992). PHAs are also required by the California Accidental Release Prevention Program and the federal EPA Risk Management Program. 7 Under 8 CCR §5189 (e). https://www.dir.ca.gov/title8/5189.html (accessed September 25, 2013).

Chevron Richmond Refinery Regulatory Report December 2013

9 DRAFT FOR PUBLIC COMMENT 1.3 Background Although both the federal and California PSM standards, respectively, were intended to be goal-setting or performance-based, 8,9 in practice they appear to function primarily as reactive and activity-based10 regulatory schemes that require extensive rulemaking to modify. As a result, the federal and California PSM standards have become static in the face of advancing best practices and technology, with the emphasis placed on the completion of a task or activity rather than achievement of continuous risk reduction.11 Many regions around the world such as the UK, Australia, and Norway have acknowledged similar deficiencies and have implemented regulatory regimes consisting of both prescriptive12 and goal- setting elements that require duty holders13 to demonstrate to the regulator through rigorous reviews and audits that they have reduced risks to as low as reasonably practicable, or ALARP. This is referred to as the safety case regulatory regime.14 The safety case regulatory regime is a rigorous prescriptive and goal- setting regulatory approach applied globally both onshore and offshore. It is highlighted by its adaptability and requirements for continuous improvement in risk reduction for high hazard industrial facilities. A written case for safety, known as the safety case report, is generated by the duty holder and is generally rigorously reviewed, audited, and enforced by highly technically competent inspectors with skill sets familiar to those employed by the industries they oversee. Despite this global shift, the US has persisted in the use of a more activity-based regulatory scheme that lacks the ability to adapt to advancing technology and recently developed industry standards, and which has failed to adequately engage companies and their employees in continuous improvement and risk reduction with similarly-skilled inspectors.

8 Also referred to as performance-based regulations, goal-setting regulatory requirements and acceptance criteria are specified and industry must document that their specific solutions meet such requirements, e.g. in terms of acceptable risk levels. 9 See Preamble to Process Safety Management of Highly Hazardous Chemicals; Explosives and Blasting Agents. Section III. Summary and Explanation of the Final Rule (March 4, 1992). https://www.osha.gov/pls/oshaweb/owadisp.show_document?p_table=PREAMBLES&p_id=1041 (accessed August 13, 2013). 10 Activity-based standards and regulations require the mere completion of an activity and do not focus on the effectiveness of major accident prevention or risk reduction. 11 As will be discussed below, certain sections of the PSM standard have elements of a performance-based regulatory approach. 12 A prescriptive regulation or standard describes the specific means or activity-based actions to be taken for hazard abatement and compliance. Performance or goal-based regulations, on the other hand, state the objective to be obtained (such as risk reduction or hazard abatement) without describing the specific means of obtaining that objective. 13 Duty holders are considered to be “those who create and/or have the greatest control of the risks associated with a particular activity. Those who create the risks at the workplace are responsible for controlling them.” HSE. Planning to do business in the UK offshore oil and gas industry? What you should know about health and safety; October 2011; p 2. These entities may include operators, contractors, and subcontractors. http://www.hse.gov.uk/offshore/guidance/entrants.pdf (accessed June 5, 2013). 14 Norway’s offshore regulatory regime is not referred to as the safety case regime, but it does contain many of the same elements as the safety case regime, with some differences in style, substances, and implementation.

Chevron Richmond Refinery Regulatory Report December 2013

10 DRAFT FOR PUBLIC COMMENT 1.4 Key Findings Technical

In the ten years prior to the incident, highly knowledgeable and experienced Chevron technical staff repeatedly recommended that inspectors perform 100 percent component inspections on high temperature carbon steel piping susceptible to sulfidation corrosion. These recommendations were not implemented by Chevron management.15

Chevron technical staff recommended implementing inherently safer designs through the MOC process, incident investigations, technical reports, and past recommendations from employees. However, Chevron failed to implement proposed inherently safer recommendations prior to the incident. For example, an inspection recommendation to upgrade piping to 9-Chrome was made, but the MOC to implement the recommendation narrowed the scope, allowing the 52-inch component that failed to remain in service.

In January 2007, a failure due to sulfidation corrosion caused a fire in the Chevron Richmond Refinery crude unit, initiating a shelter-in-place for the surrounding community. A carbon steel piping spool16 failed catastrophically during operation. Chevron informed Contra Costa Health Services’ Hazardous Materials Program17 in a letter that the crude unit piping metallurgy had been upgraded following this incident as an inherently safer solution. However, this upgrade was limited to only the immediate piping spool that had failed. The inherently safer, more corrosion resistant metallurgy was not implemented more broadly in the crude unit as a result of this incident.

Chevron and Chevron ETC metallurgists, materials engineers, and piping inspectors had expertise regarding sulfidation corrosion. However, they had limited practical influence to implement their recommendations. They did not participate in the most recent crude unit PHA, and they did not affect decisions concerning control of sulfidation corrosion during the crude unit turnaround process.18

The 2009 crude unit PHA did not identify corrosion as a potential cause of a leak or rupture in piping. The PHA cited non-specific, judgment-based qualitative safeguards to reduce risk, such as: utilizing metallurgy to minimize corrosion, having effective maintenance and inspection programs, and providing pipe wall corrosion allowances.19 The effectiveness of these safeguards was neither evaluated nor documented; instead the safeguards were merely listed in the PHA. Had the adequacy of these safeguards

15 These recommendations are discussed in detail in paragraphs 44 through 51 of the Chevron Interim Report. 16 A piping spool is a small, removable section of piping. In some cases, a piping spool is installed or removed in order to provide a temporary connection or complete disconnection between two piping circuits. 17 Contra Costa Health Services’ Hazardous Materials program is designed to respond to emergencies and monitor hazardous materials within Contra Costa County. See http://cchealth.org/hazmat/ (accessed April 17, 2013). 18 The turnaround process includes both the planning stage prior to the shutdown and the activities staged during the shutdown. 19 Corrosion allowance refers to extra wall thickness added as a safety factor to the design of a piece of equipment beyond that needed solely for mechanical considerations such as design temperature and pressure. This extra thickness is provided to accommodate for expected loss of wall thickness due to corrosion over the life of the equipment.

Chevron Richmond Refinery Regulatory Report December 2013

11 DRAFT FOR PUBLIC COMMENT been verified, improved safeguards intended to protect against sulfidation-induced failure of carbon steel piping could have been recommended.

Regulatory

Following the August 6th incident, California’s Division of Occupational Safety and Health (Cal/OSHA) inspected the Chevron facility and issued citations. Only one citation was related to PHAs; and it was not associated with evaluating the effectiveness of safeguards. Rather, the emphasis was that Chevron’s PHA did not adequately account for hazards caused by other units associated with the crude unit. Had the California PSM standard required documentation of the effectiveness of safeguards, Chevron would have been obligated to conduct this analysis and Cal/OSHA inspectors could rely on the regulation for support during inspections.

There is a significant discrepancy in the compensation between the California regulators and the Chevron Richmond Refinery personnel they interact with. The California regulators also lack the technical staff with the necessary skills, knowledge, and experience to provide sufficient direct oversight of petroleum refineries in California.

The CSB has noted a considerable problem with significant and deadly incidents at petroleum refineries over the last decade. In 2012 alone, the CSB tracked 125 significant process safety tincidents at US petroleum refineries. Seventeen of these took place in California.

Under the existing regulatory regimes for onshore petroleum refineries in the US and California, such as the PSM and RMP programs, there is no requirement to reduce risks to ALARP. For example, under both PSM and RMP an employer must “control” hazards when conducting a process hazard analysis (PHA) of a covered process. However, there is no requirement to address the effectiveness of the controls or the hierarchy of controls. Thus, a PHA that meets the regulatory requirements may inadequately identify or mitigate major hazard risk. In addition, there is no requirement to submit PHAs to the regulator, and the regulator is not responsible for assessing the quality of the PHA or the proposed safeguards.

In the last decade, the CSB has made a number of process-safety related recommendations to OSHA and EPA in its investigation reports and studies (e.g. Motiva, BP Texas City, and Reactive Hazards). However, none of the regulatory recommendations have been implemented, and there have been no substantive changes made to the PSM and RMP regulations to improve the prevention of major accidents.

Available data from Norway and the United Kingdom (UK) shows a reduction in hydrocarbon releases offshore under the safety case regulatory regime.20

Regulatory approaches similar to the safety case regulatory regime, which require risk reduction to ALARP or equivalent, have been implemented in the nuclear sector by the Nuclear Regulatory Commission (NRC) and the aerospace sector by NASA.

20 Norway’s indicator data is discussed in Section 4.5. The UK data is discussed in Appendix C.

Chevron Richmond Refinery Regulatory Report December 2013

12 DRAFT FOR PUBLIC COMMENT

  1. Independent studies of the safety case in the UK have identified improvements to safety performance

from the safety case regulatory regime and a variety of stakeholders, including major oil companies, have shown support of the safety case.21 1.5 Regulatory Conclusions The existing regulatory regimes for onshore petroleum refineries in the US and California:

Rely on a safety and environmental management system framework that is primarily activity-based rather than goal-based risk reduction to as low as reasonably practicable (ALARP) or equivalent.

Are static, unable to adapt to innovation and advances in the management of major hazard risks.

Place the burden on the regulator to verify compliance with the regulations rather than shifting the burden to industries by requiring duty holders to effectively manage the risks they create and ensure regulator acceptance of their plans for controlling those risks.

Do not effectively incorporate lessons learned from major accidents; nor do they have the regulatory authority to require duty holders to address newly-identified safety issues as a result of such incidents.

Do not effectively collect or promote industry use of major accident performance indicators to drive industry to reduce risks to ALARP.

Do not require the use or implementation of inherently safer systems analysis or hierarchy of controls.

Do not effectively involve the workforce in hazard analysis and prevention of major accidents.

Do not provide the regulator with the authority to accept or reject a company’s hazard analysis, risk assessment, or proposed safeguards; and

Do not employ the requisite number of staff with the technical skills, knowledge, and experience to provide sufficient direct safety oversight of petroleum refineries.

21 See Sections 2.0, 3.2.12, and 3.2.2.3. Also see FAQ 4.

Chevron Richmond Refinery Regulatory Report December 2013

13 DRAFT FOR PUBLIC COMMENT 1.6 Recommendations As a result of the findings and conclusions of this report, the CSB makes recommendations, summarized below, to the following recipients:

California State Legislature, Governor of California

Develop and implement a step-by-step plan to establish a more rigorous safety management regulatory framework for petroleum refineries in the state of California based on the principles of the “safety case” framework.

Occupational Safety and Health Administration

As part of your response to Executive Order 13650, develop questions and evaluate issues raised from the findings and conclusions in this report concerning the safety case regime.

Section 7.0 details the recommendations.

Chevron Richmond Refinery Regulatory Report December 2013

14 DRAFT FOR PUBLIC COMMENT 2.0 Introduction

Despite the fact that the nation’s roughly 150 petroleum refineries represent only a small fraction of the thousands of industrial and chemical facilities that exist in the US, the CSB has seen a great number of serious and deadly incidents at refineries over the last decade.

In March 2005, the BP Texas City Refinery suffered one of the worst industrial accidents in recent US history, when overfill of a distillation column resulted in an explosion and fire that led to 15 fatalities, another 180 injuries, and the issuance of a shelter-in-place order that required 43,000 people to remain indoors. Houses were damaged as far as three-quarters of a mile away from the refinery. In a 2006 statement, former CSB Chairwoman Carolyn Merritt said that while BP did make some safety improvements before the March 2005 explosion, “the focus of many of these initiatives was on improving procedural compliance and reducing occupational injury rates, while catastrophic safety risks remained…”22 In November 2009, an explosion at the Silver Eagle Refinery damaged over 100 homes in a nearby subdivision in Woods Cross, Utah. At a public meeting to discuss the incident, former CSB Chairman John Bresland called on refineries to improve their safety performance, stating: The frequency of accidents in US refineries is very troubling. These accidents cost lives, inflict serious injuries and can harm communities. They also earn scrutiny from government regulators; in the past few weeks a refinery in Texas drew the largest OSHA fine in history, more than US $80 million, for alleged process safety violations. I call on all refineries to redouble their commitment to safer operations and safer communities. The current rate of accidents in refineries is not sustainable and it is not acceptable.23 On the five-year anniversary of the BP Texas City explosion in March 2010, Chairman Bresland continued to relay his concern regarding refinery safety, noting that “refinery accidents…continue to occur with dismaying frequency…[and] will only stop when every refinery has made the financial and human commitment to sound process safety management.”24 Yet just ten days later, seven workers were fatally injured at the Tesoro refinery in Anacortes, Washington, following the catastrophic failure of a heat exchanger. Again, Chairman Bresland pointed out the alarming frequency of refinery incidents, stating that “if the aviation industry had the same number and types of incidents as the refining industry, I don’t think people would be flying too much.”25 In 2012 alone, the CSB tracked 125 significant26 process safety incidents at US petroleum refineries, which are listed in Appendix A. Seventeen of these took

22 Scrutiny Finds BP Safety Troubles. http://usatoday30.usatoday.com/money/industries/energy/2006-10-30-bp- blast-findings_x.htm (accessed September 5, 2013). 23US Refineries Commitment to Safety Called Into Question. http://www.engineerlive.com/content/22354 (accessed September 5, 2013). 24 http://www.csb.gov/statement-from-csb-chairman-john-bresland-on-5th-anniversary-of-fatal-bp-texas-city-2005- explosion/?pg=18 (accessed September 5, 2013). 25Refinery Tragedies All Too Common. See http://seattletimes.com/html/localnews/2011518449_safetysunday04m.html (accessed September 5, 2013) 26 These incidents were reported to the Department of Energy and/or the National Response Center and examined by the CSB’s Incident Screening Department.

Chevron Richmond Refinery Regulatory Report December 2013

15 DRAFT FOR PUBLIC COMMENT The CSB tracked 125 significant petroleum refinery incidents in the US in 2012. place in California, including a major release of 8,614 pounds of highly toxic hydrogen sulfide at the Chevron Richmond Refinery on August 2, 2012, just four days prior to the incident. Of the 15 major accidents that the CSB is currently investigating, six occurred in petroleum refineries. These include two separate explosions at the Silver Eagle refinery in Woods Cross, Utah, which resulted in injuries and offsite consequences, the heat exchanger rupture at the Tesoro refinery in Anacortes, Washington, which resulted in seven fatalities, and a series of equipment failures at CITGO’s refinery in Corpus Christi, Texas, involving highly toxic hydrogen fluoride. The U.S. Environmental Protection Agency (EPA) has also documented 234 recordable accidents at petroleum refineries between 2000 and 2010, which is more than any other industry, including the much larger sector of chemical manufacturing, which EPA documented as having 218 recordable accidents.27

The CSB concludes that the continuing occurrence of refinery accidents demonstrates the pressing need to examine the current regulatory structure in place in the US and, in light of the Chevron incident, in the state of California for petroleum refineries. There have been a number of positive developments in the wake of the Chevron incident that demonstrate California’s prime opportunity to lead the nation in implementing changes to improve safety and health in the refining industry. In the Fall of 2012 following the Chevron incident, California Governor Jerry Brown created the California Interagency Working Group on Refinery Safety (“the working group”), charged with improving cooperation among agencies, including the U.S. Environmental Protection Agency (EPA), Cal EPA, California’s Division of Occupational Safety and Health (Cal/OSHA), and Contra Costa County, with the goal of improving safety at California’s petroleum refineries and preventing major accidents.

The working group began its initiative by commissioning the Labor Occupational Health Program28 (LOHP) to conduct “listening panels” throughout California, enabling community members to meet with working group members to discuss their concerns surrounding refineries. LOHP convened a series of meetings and conference calls with labor unions, community-based organizations, fire agencies, and environmental health groups between November 6, 2012, and March 18, 2013. Dr. Michael P. Wilson, the Director of LOHP, documented his findings and recommendations regarding refinery safety in a summary report entitled Refinery Safety in California: Labor, Community and Fire Agency Views, which was released on June 4, 2013.29 In the report, Dr. Wilson quoted Swiss Re’s finding that the US has experienced financial losses from refinery incidents that are three times that of industry counterparts in countries within the “EU cluster,”30 a gap which continues to grow due in part to the US refining

27 Matthiessen, Craig. EPA Risk Management Program: An Overview of the EPA Risk Management Program and Inherently Safer Processes. NAS-MIC Bayer Public Meeting Power Point Presentation; May 24, 2011; p 20. 28 LOHP is a public service program for the Center for Occupational and Environmental Health at UC Berkeley’s School of Public Health. LOHP seeks “to reduce occupational injury, illness and death by protecting the health and safety of workers worldwide.” For more information, see http://www.lohp.org/ (accessed July 8, 2013). 29 Dr. Wilson released an initial draft of the summary report on March 27, 2013. He then released a revised copy of the summary report on June 4, 2013. See http://www.lohp.org/projects/refinery_safety.html (accessed July 8, 2013). 30 The countries in the EU cluster are all of Europe, Singapore, South Korea, Japan, Saudi Arabia, Gulf States and Egypt.

Chevron Richmond Refinery Regulatory Report December 2013

16 DRAFT FOR PUBLIC COMMENT industry’s “pushing…mode of operation”, its “compliance-driven focus on safety”, and “a ‘detached’ workforce….”31

Dr. Wilson reiterated a number of the findings contained in the CSB’s Interim Report on the Chevron incident, including the “striking lack of attention on the part of the Richmond Chevron refinery to maintenance and metallurgy upgrades…,” and the Chevron Richmond Refinery’s failure to implement a recommended 100% component inspection program for high-risk piping. He also stated that California’s refineries are able to operate without demonstrating competence in health, safety, and environmental performance to a regulatory agency or to the public, and as such recommended that California establish a regulatory approach similar to that of the safety case regulatory regime, a rigorous prescriptive32 and goal- setting33 regulatory regime used widely by other regions throughout the world such as the United Kingdom (UK) and Australia to regulate high hazard industrial facilities. It is highlighted by its adaptability and requirements for continuous improvements in risk reduction, and shifts the burden to the industry to demonstrate its competence in health and safety to the regulator. The regime is overseen by highly competent, well-funded regulators that rigorously audit facilities for compliance with the written safety case report and good industry practice.

On July 11, 2013, the working group released a draft report entitled Improving Public and Worker Safety at Oil Refineries,34 which the CSB has recognized as an important step forward in improving petroleum refinery safety and environmental performance both in California and nationally. The report outlined the process of adopting several of the CSB‘s recommendations from its Interim Report on the Chevron incident, including requiring refineries to implement inherently safer systems and conduct damage mechanism hazard reviews. Furthermore, the report announced the creation of an Interagency Refinery Task Force within the California Environmental Protection Agency (Cal/EPA) by September 1, 2013, aimed at facilitating information sharing and improving coordination of oversight and enforcement activities among regulatory agencies. The CSB also welcomed the report’s recommendation for California to study the safety case regulatory approach.

In addition to the work being done by the working group, the California State Legislature approved a 2013-2014 state budget bill (AP 110) that allows the California Department of Industrial Relations to charge state petroleum refineries a “fee” by March 31, 2014, to help pay for at least 15 new positions in

31 Wilson, Michael P. Refinery Safety in California: Labor, Community and Fire Agency Views; Summary Report for Office of Governor Jerry Brown, Interagency Task Force on Refinery Safety; March 27, 2013, Revised June 4, 2013; pp 5 and 6. Citing Zirngast, Ernst. (June 6, 2006). Selective U/W in Oil-Petro Segment: Loss Burden in Different Regions, USA vs. Rest of the World, History of Selective U/W, Cause of Losses. Technical report-DRAFT- EXTRACT. Risk Engineering Services, Swiss Re. http://www.lohp.org/projects/refinery_safety.html (accessed July 8, 2013). 32 A prescriptive regulation or standard describes the specific means or activity-based actions to be taken for hazard abatement and compliance. Performance or goal-based regulations, on the other hand, state the objective to be obtained (such as risk reduction or hazard abatement) without describing the specific means of obtaining that objective. 33 Also referred to as performance-based regulations, goal-setting regulatory requirements and acceptance criteria are specified and industry must document that their specific solutions meet such requirements, e.g. in terms of acceptable risk levels. 34 See http://www.calepa.ca.gov/Publications/Reports/2013/Refineries.PDF (accessed September 25, 2013).

Chevron Richmond Refinery Regulatory Report December 2013

17 DRAFT FOR PUBLIC COMMENT Cal/OSHA’s Process Safety Unit, which enforces the California Process Safety Management (PSM) standard throughout the state.35

The Chevron incident also spurred the formation of the City of Richmond’s Collaborative on Refinery Safety and Community Health (“the collaborative”), which was launched on January 30, 2013, and is led by Dr. Wilson. The collaborative, whose members include the United Steelworkers36 (USW) Local 5, the USW International, Communities for a Better Environment,37 and LOHP,38 was launched after a preliminary exploratory meeting held on January 23, 2013, which was convened by LOHP and attended by CSB Board Members and the CSB Chevron Investigation Team. The collaborative advocates for community and worker safety, better transparency, and environmental health, and has already made recommendations to the working group to improve emissions reporting and require more thorough assessments of pipe corrosion damage at oil refineries.39

On October 10, 2013, the collaborative formally responded in a memo to the July 2013 draft report issued by the Interagency Working Group on Refinery Safety (Improving Public and Worker Safety at Oil Refineries). In the memo, the collaborative stated its support for the working group’s findings and recommendations. The collaborative also issued its own recommendations and highlighted 12 principles as being important to the development of effective regulatory policy in California. These principles include linking regulatory non-compliance to an operator’s license to operate and integrating meaningful participation in decision-making by workers and communities.40 The collaborative also noted in the memo that it supported “shifting the ‘burden of proof’ of safety from public agencies to the industry, as is required in the ‘Safety Case’ approach…”41

The CSB noted in its Chevron Interim Report the important role of transparency between industry and the public in improving health and safety for the facility and the surrounding communities. Following the Chevron incident the collaborative, worker representatives, regulators, and governmental bodies played a key role in driving transparency, accountability, and improved risk reduction during the decision-making process related to crude unit piping repairs. The CSB recommended to the California State Legislature in the Interim Report to establish a multi-agency process safety regulatory program for all California petroleum refineries to further improve public accountability and transparency by establishing a system to

35 See http://www.caltax.org/homepage/062113_Legislature_Approves.html (accessed July 9, 2013). 36 The USW is the largest industrial union in North America and has approximately 1.2 million active and retired members in the US, Canada, and the Caribbean. For more information see http://www.usw.org/ (accessed July 17, 2013). 37 Communities for a Better Environment is an “environmental justice organization[s]” in California which has the mission of “build[ing] people’s power in California’s communities of color and low income communities to achieve environmental health and justice by preventing and reducing pollution and building green, health and sustainable communities and environments.” See http://www.cbecal.org/about/mission-vision/ (accessed August 14, 2013). 38 Other members of the collaborative include the BlueGreen Alliance (a coalition of labor unions and environmental groups that advocate for a green economy and safer workplaces), the National Resources Defense Council, and the Asian Pacific Environmental Network. 39 See http://richmondconfidential.org/2013/02/20/labor-and-environmental-groups-join-forces-on-refinery-issues/ (accessed July 9, 2013). 40 Refinery Action Collaborative. Initial Response of the Collaborative to the Findings & Recommendations of The July 2013 Draft Report of the Interagency Working Group on Refinery Safety, Governor Jerry Brown. October 10, 2013; p 10. 41 Ibid at 7.

Chevron Richmond Refinery Regulatory Report December 2013

18 DRAFT FOR PUBLIC COMMENT report to the regulator methodologies, findings, conclusions, and corrective actions related to refinery mechanical integrity inspection and repair work arising from California petroleum refinery PHAs, turnarounds, and maintenance-related shutdowns. This system would require reporting of information such as damage mechanism hazard reviews, establish procedures for greater workforce and public participation, and provide mechanisms for federal, state, and local agency operational coordination, sharing of data, and joint accident prevention activities. California is actively working to implement this recommendation through the creation of the Interagency Refinery Task Force mentioned above.

The positive and productive developments that have taken place in the wake of the Chevron incident strongly suggest that California has a unique opportunity to implement changes to improve safety and health in the refining industry that can serve as a model to the rest of the country.

It is also important to note that a growing dialogue has emerged throughout the US surrounding the need to improve the regulation of hazardous materials and processes in the US, to which the CSB has been an important contributor. The CSB first examined the safety case in its 2002 investigation report entitled Improving Reactive Hazard Management42 as a potentially effective alternative framework for the regulation of reactive hazards. The CSB noted that successful implementation of this “comprehensive” regulatory approach required a competent and experienced regulator. In December 2010, the CSB held a public hearing in Washington, DC on the Regulatory Approaches to Offshore Oil and Gas Safety, where internationally recognized experts in industrial safety and accident analysis provided important testimony on managing risks offshore.43 Much of this testimony supported the implementation of the safety case as a model for regulating major hazards, both onshore and off. For example, a Shell Oil Company representative testified that the company had been using the safety case globally since 2002, and noted that the most valuable aspect of that type of regulatory regime was the need to demonstrate that major hazards have been managed using effective barriers44 and controls. In July 2012, the CSB held an additional public hearing on Safety Performance Indicators.45 A number of international regulators testified on the regulator’s ability under the safety case to drive continuous improvement in the oil and gas industry. Finally, on July 25, 2013, the CSB held a public meeting to discuss the U.S. Occupational Safety and Health Administration’s (OSHA) failure to implement a number of key CSB safety recommendations made to OSHA in the last decade to revise and improve its Process Safety Management (PSM) standard and to issue a new combustible dust standard.

On January 18, 2011, President Obama issued Executive Order 13563,46 which called for improvements in the nation’s regulatory system to promote predictability and reduce uncertainty and to use the best,

42 A full copy of the report is available at http://www.csb.gov/improving-reactive-hazard-management/ (accessed July 10, 2013). 43 For a copy of the transcript from the CSB Public Hearing on the Regulatory Approaches to Offshore Oil and Gas Safety, see http://www.csb.gov/assets/1/19/Transcript_of_Public_Meeting_12_15_2010.pdf (accessed August 14, 2013). 44 A barrier is a “technical, operational and/or organizational element[] which individually or collectively reduce[s] opportunities for specific error, hazard or accident to occur, or which limits its harm/drawbacks.” Petroleum Safety Authority. Safety Status & Signals, 2012-2012; 2013; p 31. 45 For the proceedings of the CSB Public Hearing on Safety Performance Indicators see http://www.csb.gov/events/csb-public-hearing-safety-performance-indicators/ (accessed August 14, 2013). 46 Exec. Order No. 13563, 76 Fed. Reg. 14 (January 21, 2011). http://www.archives.gov/federal-register/executive- orders/2011.html (accessed July 10, 2013).

Chevron Richmond Refinery Regulatory Report December 2013

19 DRAFT FOR PUBLIC COMMENT most innovative, and least burdensome tools for achieving regulatory ends. Specifically, it directed that agencies review existing and proposed standards and regulations to ensure they effectively protect “public health, welfare, safety, and our environment while promoting economic growth, innovation, competitiveness, and job creation.”47 Finally, the order emphasized that to the extent feasible, regulations and standards should specify performance objectives rather than the behavior or manner of compliance that regulated entities must adopt, and be adopted through a process that involves public participation. As a result of this Executive Order, OSHA, the Bureau of Safety and Environmental Enforcement (BSEE), the U.S. Environmental Protection Agency (EPA), the Department of Transportation’s Pipeline and Hazardous Materials Safety Administration (PHMSA), and the U.S. Coast Guard (USCG) solicited views from the public and stakeholders regarding opportunities to address improving efficiency and effectiveness of safety and environmental regulations and standards in the oil and gas industry.48 These five agencies then convened an expert forum49 in September 2012 in Texas City, Texas, to explore the benefits of implementing goal or performance-based regulatory models such as the safety case in the oil and gas industry, and ways to advance the use of such models in the US. The forum included a discussion of the safety case regulatory regime as a performance-based regulatory model, and industrial safety and accident analysis expert Dr. Andrew Hopkins spoke in support of that model.

The CSB has utilized a broad range of expert testimony and research to gain a comprehensive understanding of regulatory models for onshore and offshore oil and gas facilities in countries around the world, and, in light of this investigation, the state of California. This report highlights the significant attributes of the safety case regime that together result in a more effective regulatory approach to process safety and risk reduction. It also provides a detailed contrast of the safety case regulatory model to the existing regulatory structures in the US and California, and makes recommendations to improve California’s regulatory oversight of its petroleum refineries and to promote a broader national dialogue on the safety case regulatory approach.

47 Ibid. 48 For more information see https://www.osha.gov/pls/oshaweb/owadisp.show_document?p_table=FEDERAL_REGISTER&p_id=23267 (accessed July 10, 2013). 49 See https://www.osha.gov/pls/oshaweb/owadisp.show_document?p_table=FEDERAL_REGISTER&p_id=23267 (accessed August 13, 2013).

Chevron Richmond Refinery Regulatory Report December 2013

20 DRAFT FOR PUBLIC COMMENT 3.0 The Safety Case Regulatory Regime 3.1 Introduction Throughout modern history, major industrial accidents have been catalysts for significant regulatory reform, as countries around the world strive to mitigate risk and improve the safety of their facilities and processes in order to protect human health and the environment. According to industrial safety and accident analysis expert Dr. Andrew Hopkins, “[d]isasters…offer an unparalleled opportunity to study the workings of an organisation and to identify where things are going wrong.”50 Around the world, many of these large-scale incidents have resulted in sweeping changes to legislation surrounding industrial safety and health. These changes replace prescriptive, compliance-based regulations with goal-setting regulations supplemented by prescriptive requirements that support adaptability, require duty holders51 to demonstrate to the regulator that they have driven risks to as low as reasonably practicable (ALARP) or equivalent, and provide the regulator with the tools to drive continuous improvement among major hazard facilities.52 A majority of these regulatory regimes are referred to as the safety case, which Dr. Hopkins defines as: a case which the operator of a hazardous facility makes to the regulator, setting out how safety is to be managed. It must include details of the hazard identification process, the hazards which have been identified and the procedures which have been set in place to control them. The system remains self-regulatory in principle but rather than the facility being left to its own devices by the regulator it must convince the regulator that its strategy for managing safety is satisfactory [emphasis added]. Under any safety case regime, facility operators are expected to adopt best practice risk management.53 The safety case regulatory regime is much more than a written report; it shifts risk management responsibility to the company and its employees and provides for rigorous review and oversight by a technically competent regulator to ensure effective implementation. The remaining portions of Section 3 will introduce major accidents that have occurred around the world and discuss the history behind the global development and implementation of the safety case regulatory

50 Hopkins, Andrew. Managing Major Hazards: The Lessons of the Moura Mine Disaster; National Library of Australia, 1999; p 1. 51 Duty holders are considered to be “those who create and/or have the greatest control of the risks associated with a particular activity. Those who create the risks at the workplace are responsible for controlling them.” HSE. Planning to do business in the UK offshore oil and gas industry? What you should know about health and safety; October 2011; p 2. These entities may include operators, contractors, and subcontractors. http://www.hse.gov.uk/offshore/guidance/entrants.pdf (accessed June 5, 2013). 52 Major hazard facilities are workplaces that store, handle or process large quantities of hazardous material. Incidents at such facilities have the potential to cause serious damage to employees, people in surrounding areas, and the environment. See http://www.pc.gov.au/__data/assets/pdf_file/0018/82350/21-appendixd.pdf (accessed May 9, 2013). 53 Hopkins, Andrew. Lessons from Esso’s Gas Plant Explosion at Longford; Australian National University [Online]; p 7. http://www.sirfrt.com.au/Meetings/IMRt/Southeast/IMRt%20East%2000Nov30/Andrew%20Hopkins%20presentati on/Lonford%20talk.PDF (accessed May 8, 2013).

Chevron Richmond Refinery Regulatory Report December 2013

21 DRAFT FOR PUBLIC COMMENT approach on and offshore. Section 4.0 will then highlight major attributes of the safety case regulatory approach. The US regulatory model will also be introduced and discussed throughout these sections to allow for comparisons between the different approaches. Finally, Section 5.0 will discuss the regulation of petroleum refineries in California specifically, including Chevron. The report concludes with important recommendations focused on improving the regulatory oversight of California’s 15 refineries, and encouraging OSHA, industry, labor, and others to work together to improve the regulation of petroleum refineries throughout the US. 3.2 Initial Safety Case Implementation 3.2.1 United Kingdom 3.2.1.1 Onshore Two major onshore incidents in the 1970s helped spark legislative reform focused on major accident prevention and risk reduction for onshore major hazard facilities. A large dioxin54 release in Seveso, Italy, in 1976, which injured hundreds of individuals, led the European Commission55 to adopt legislation in 1982 known as the Seveso Directive, aimed at the prevention and control of major industrial accidents.56 Following the 1984 toxic release in Bhopal, India, which resulted in several thousand known fatalities, and the Sandoz chemical plant fire near Basel, Switzerland, which injured 14 individuals and released nearly 30 tons of pesticides into the Rhine River, turning it red, the Seveso Directive was amended and replaced in 1996 with the Seveso II Directive.57 The regulation requires owners or operators of facilities that contain threshold quantities of listed substances to submit safety reports to a competent authority (CA) within a Member State of the European Commission for its review and acceptance.58 These reports must demonstrate to the CA that major-accident prevention policies, safety management systems, and internal emergency plans have been created and implemented.59 The regulation also requires owners or operators to “prove to the competent authority…that he has taken all measures necessary as specified in this Directive.”60

54 The term Dioxin refers to a family of toxic chemicals. They have been characterized by EPA as likely to be human carcinogens and are anticipated to increase the risk of cancer at background levels of exposure. See http://www.epa.gov/pbt/pubs/dioxins.htm (accessed June 17, 2013). 55 The European Commission consists of 27 Commissioners and “represents the interests of the EU [European Union] as a whole. It proposes new legislation to the European Parliament and the Council of the European Union, and it ensures that EU law is correctly applied by member countries.” http://ec.europa.eu/atwork/index_en.htm (accessed May 6, 2013). 56 See http://ec.europa.eu/environment/seveso/ (accessed May 6, 2013). 57 The Seveso Directive was adopted in 1982 and was amended twice, in 1987 and 1988. On December 9, 1996, the Seveso II Directive was adopted and replaced the original Seveso Directive. The Seveso III Directive was then adopted on July 4, 2012, and became effective on August 13, 2012. Member States must implement Seveso III by June 1, 2015. http://ec.europa.eu/environment/seveso/ (accessed May 6, 2013). 58See http://ec.europa.eu/environment/seveso/legislation.htm (accessed May 6, 2013). 59 Seveso II Directive, Article 9 (1996). Available at http://eur- lex.europa.eu/LexUriServ/LexUriServ.do?uri=CONSLEG:1996L0082:20031231:EN:PDF (accessed July 15, 2013). 60 Seveso II Directive, Article 5, Paragraph 2 (1996). Available at http://eur- lex.europa.eu/LexUriServ/LexUriServ.do?uri=CONSLEG:1996L0082:20031231:EN:PDF (accessed July 15, 2013).

Chevron Richmond Refinery Regulatory Report December 2013

22 DRAFT FOR PUBLIC COMMENT The COMAH Regulations require covered onshore facilities in the UK to “take all measures necessary to prevent major accidents and limit their consequences to people and the environment.” The HSE interprets this duty as the equivalent of reducing risks to as low as reasonably practicable, or ALARP. On June 1, 1974, the Flixborough Works of Nypro (UK) Limited experienced a massive cyclohexane vapor cloud explosion, killing 28 workers and injuring 36 workers and hundreds of members of the public offsite. This incident along with the Seveso incident led to the Seveso Directive in 1982, and this was converted into legislation in the United Kingdom (UK) via the Control of Industrial Major Accident Hazards (CIMAH) 1984 Regulations. The Control of Major Accidents61 Hazards Regulations (COMAH) replaced CIMAH in April 1999 to conform to the updated Seveso II Directive. The Health and Safety Executive62 (HSE), the Environment Agency63 (EA), and the Scottish Environmental Protection Agency64 (SEPA) are considered to be the UK’s CA responsible for the enforcement of these regulations. A key feature differentiating these two regulations is the increasing emphasis from the operator having to “describe” the safety systems in CIMAH to being required to “demonstrate” their adequacy in COMAH.65 The COMAH regulations apply to all onshore facilities that have sufficient quantities of dangerous substances as listed in Schedule 166 of the regulations.67 The general duty for all duty holders of facilities covered under the COMAH regulations is to “take all measures necessary to prevent major accidents and limit their consequences to people and the environment.”68 The HSE interprets this duty as the equivalent of reducing risks69 to “as low as reasonably practicable,” or ALARP.70,71,72 Duty holders are required to

61 The COMAH regulations define “major accident” as “an occurrence (including in particular, a major emission, fire or explosion) resulting from uncontrolled developments in the course of the operation of any establishment and leading to serious danger to human health or the environment, immediate or delayed, inside or outside the establishment, and involving one or more dangerous substances…” COMAH Regulations, Part 1, Regulation 2 (2005). 62 HSE is an independent regulator, and “act[s] in the public interest to reduce work-related death and serious injury across Great Britain’s workplaces.” See http://www.hse.gov.uk/aboutus/ (accessed May 7, 2013). According to the HSE’s Enforcement Policy Statement, the HSE’s purpose is “to protect the health, safety and welfare of people at work, and to safeguard others, mainly members of the public, who may be exposed to risks from the way work is carried out.” http://www.hse.gov.uk/pubns/hse41.pdf (accessed May 7, 2013). 63 EA is an Executive Non-departmental Public Body responsible for protecting the environment and promoting sustainable development. For more information see http://www.environment-agency.gov.uk/default.aspx (accessed July 17, 2013). 64 SEPA is Scotland’s environmental regulator, aimed at protecting and improving the environment. For more information see http://www.sepa.org.uk/ (accessed July 17, 2013). 65 COMAH Regulations. Schedule 4, Part 1. Purpose of safety reports is to “1. demonstrate[e] that a major accident prevention policy and a safety management system for implementing it have been put into effect in accordance with the information set out in Schedule 2; 2. Demonstrate[e] that major accident hazards have been identified and that the necessary measures have been taken to prevent such accidents and to limit their consequences for persons and the environment; 3. Demonstrate[e] that adequate safety and reliability have been incorporated into the – (a) design and construction, and (b) operation and maintenance, of any installation and equipment and infrastructure connected with its operation which are linked to major accident hazards within the establishment…” (2005). 66 Available at http://www.legislation.gov.uk/uksi/1999/743/schedule/1/made (accessed June 17, 2013). 67 COMAH Regulations, Part 1, Regulation 3 (2005). 68 COMAH Regulations, Part 2, Section 4 (2005). 69 HSE describes “risk” as “the likelihood that a hazard will actually cause its adverse effects, together with a measure of the effect.” See http://www.hse.gov.uk/risk/theory/alarpglance.htm (accessed May 7, 2013). 70 See http://www.hse.gov.uk/foi/internalops/hid_circs/permissioning/spc_perm_37/ (accessed May 15, 2013).

Chevron Richmond Refinery Regulatory Report December 2013

23 DRAFT FOR PUBLIC COMMENT prepare a safety report that “demonstrate[s] to the CA that all measures necessary for the prevention and mitigation of major accidents have been taken.”73 These reports must contain information for the CA to review and analyze, including a policy on preventing and mitigating major accidents; a management system for implementing that policy that complies with good practice;74 an effective method for identifying any major accidents that might occur; and measures to prevent and mitigate major accidents.75 To assist operators with reducing risks to ALARP, HSE publishes guidance documents that contain good practice guidelines and standards and that discuss what constitutes good practice.76 3.2.1.2 Offshore The international offshore energy sector experienced several catastrophic incidents in the 1980s, including the Alexander Kielland77 incident in Norway in 1980 which resulted in 123 fatalities, and the Piper Alpha78 incident in the UK in 1988, which fatally injured 167 workers. These incidents initiated offshore regulatory changes focused on risk reduction and control that were modeled after the CIMAH regulations.

71 The principal health and safety legislation in the UK is the Health and Safety at Work etc. Act 1974. It requires employers to ensure that risks to employees and others are reduced “so far as is reasonably practicable,” or SFAIRP. Health and Safety at Work etc. Act, Part I, Section 2 (1) and (2) (1974). HSE has interpreted that SFAIRP duties call for the same set of tests to be applied as duties to reduce risks “as low as reasonably practicable,” or ALARP. According to HSE, “”the two terms mean essentially the same thing and at their core is the concept of ‘reasonably practicable’;…” See http://www.hse.gov.uk/risk/theory/alarpglance.htm (accessed May 7, 2013). 72 According to HSE, the concept of “reasonably practicable” “involves weighing a risk against the trouble, time and money needed to control it. Thus, ALARP describes the level to which [they] expect to see workplace risks controlled.” This allows HSE to “set goals for duty-holders, rather than being prescriptive; HSE’s policy is that any proposed regulatory action should be based on what is reasonably practicable.” According to HSE, in most situations, deciding whether the risks are ALARP involves a “comparison between the control measures a duty- holder has in place or is proposing and the measures [they] would normally expect to see in such circumstances i.e. relevant good practice. ‘Good practice’ is defined as ‘those standards for controlling risk that HSE has judged and recognized as satisfying the law, when applied to a particular relevant case, in an appropriate manner.’… Once what is good practice has been determined, much of the discussion with duty-holders about whether a risk is or will be ALARP is likely to be concerned with the relevance of the good practice, and how appropriately it has been (or will be) implemented.” See http://www.hse.gov.uk/risk/theory/alarpglance.htm (accessed May 7, 2013). 73COMAH Regulations, Schedule 4, Part 1 (2005). See http://www.hse.gov.uk/comah/background/comah99.htm (accessed May 7, 2013). 74 HSE defines “good practice” as “those standards for controlling risk that HSE has judged and recognized as satisfying the law, when applied to a particular relevant case, in an appropriate manner.” HSE, “Assessing compliance with the law in individual cases and the use of good practice,” May 2003. Available at http://www.hse.gov.uk/risk/theory/alarp2.htm (accessed June 11, 2013). 75 COMAH Regulations, Schedule 4, Part 2 (2005). See http://www.hse.gov.uk/comah/background/comah99.htm (accessed May 7, 2013). 76 Such as HSE’s “Guidance for the topic assessment of the major accident hazard aspects of safety cases,” published in April 2006, and HSE’s “Assessing compliance with the law in individual cases and the use of good practice,” May 2003, available at http://www.hse.gov.uk/risk/theory/alarp2.htm (accessed June 11, 2013). 77 The Alexander Kielland was a drilling rig built to house offshore workers in the North Sea. During a storm, it suffered a catastrophic failure that caused it to capsize. The incident resulted in 123 fatalities. 78 On July 6, 1988, an explosion occurred aboard the Piper Alpha oil production platform 120 miles off the coast of Scotland in the North Sea. A series of explosions and fire killed 167 workers and almost completed destroyed the platform. This incident became the deadliest accident in the history of the offshore industry.

Chevron Richmond Refinery Regulatory Report December 2013

24 DRAFT FOR PUBLIC COMMENT Following the Piper Alpha incident, the UK Secretary of State for the Department of Energy ordered that a public inquiry be held to determine the circumstances surrounding the incident.79 The Secretary directed Lord Cullen, a Senator of the College of Justice in Scotland, to hold the inquiry and report to the Secretary “the circumstances of the accident and its cause together with any observations and recommendations which he thinks fit to make with a view to the preservation of life and the avoidance of similar accidents in the future.”80 The result was The Public Inquiry into the Piper Alpha Disaster (“the Cullen Report”), an extensive report released in October 1990. The report called into question the adequacy of the detailed prescriptive regulatory regime that existed at the time of the incident81 for offshore oil and gas operations, and listed 106 recommendations to revamp offshore safety regulation in the UK, 57 of which the HSE was responsible for overseeing.82 The Cullen Report found that the operating company (Occidental Petroleum, a US company), “did not possess any system which ensured that such remote, but potentially disastrous, events were subjected to systematic scrutiny…[and] there was for major projects no comprehensive system of safety assessment and management did not appear to appreciate fully the contribution which it could make.”83 The report noted that there was a need for a formal safety assessment (FSA), “an assessment essentially equivalent to the Safety Case,”84 which “involves the identification and assessment of hazards over the whole life cycle of a project…[because]…the combinations of potential hardware and human failures are so numerous that a major accident hardly ever repeats itself…[and] [a] strategy for risk management must [] address the entire spectrum of possibilities.”85 In his analysis, Lord Cullen noted that the current offshore regulations were prescriptive in nature rather than goal-setting, and that this had the effect of hampering operators’ flexibility and stifling innovation.86 He stated that “one of the reasons for adopting the goal-setting approach was to make regulations that were more flexible, so that changing technology could be accommodated without the need for new legislation.”87 Lord Cullen pointed to the CIMAH Regulations, discussed above, as a forward-looking regulatory model, which required onshore major hazard installation operators to “provide HSE with a written report on the safety of the installation…commonly called the Safety Case.”88 Lord Cullen noted

79 Department of Energy. The Public Inquiry into the Piper Alpha Disaster; Presented to Parliament by the Secretary of State for Energy by Command of her Majesty; November 1990; p iii. 80 Department of Energy. The Public Inquiry into the Piper Alpha Disaster; Presented to Parliament by the Secretary of State for Energy by Command of her Majesty; November 1990; p iv. 81Department of Energy. The Public Inquiry into the Piper Alpha Disaster; Presented to Parliament by the Secretary of State for Energy by Command of her Majesty; November 1990; p 27. 82 Oil &Gas UK. Piper Alpha: Lessons Learnt; 2008; p 2. 83 Department of Energy. The Public Inquiry into the Piper Alpha Disaster; Presented to Parliament by the Secretary of State for Energy by Command of her Majesty; November 1990; p 275. 84 Lord Cullen describes the Safety Case as “a means by which an operator demonstrates to itself the safety of its activities…[and] as the basis for the regulation of major hazard activities…” Ibid at 276-277. 85 Ibid. 86 Department of Energy. The Public Inquiry into the Piper Alpha Disaster; Presented to Parliament by the Secretary of State for Energy by Command of her Majesty; November 1990; p 339. 87 Department of Energy. The Public Inquiry into the Piper Alpha Disaster; Presented to Parliament by the Secretary of State for Energy by Command of her Majesty; November 1990; p 364. 88 Ibid at 276.

Chevron Richmond Refinery Regulatory Report December 2013

25 DRAFT FOR PUBLIC COMMENT that the safety case “is a means by which an operator demonstrates to itself the safety of its activities…[and] also serves as the basis for the regulation of major hazard activities.”89 Lord Cullen concluded that an FSA “is an essential element in a modern safety regime for major hazard installations…that this FSA should take the form of a Safety Case…[and that] [t]he regime should have as its central feature demonstration of safe operation by the operator.”90 He recommended that a safety case regulatory regime be implemented offshore for both fixed and mobile installations as it already was for onshore major hazard installations, that it be complemented by other regulations dealing with specific features, that the safety case contain goal-setting regulations, and that it be part of a continuing dialogue between the operator and the regulatory body.91 Lord Cullen recommended the implementation of safety regulations requiring the owner or operator of every fixed and mobile installation operating in UK waters to submit a safety case to HSE. In response, the UK established the Offshore Installations (Safety Case) Regulations in 1992.92 The primary goal of these Regulations was “to reduce the risks from major accident hazards to the health and safety of the workforce employed on offshore installations or in connected activities.”93 Oil & Gas UK, 94 the main UK offshore oil industry trade association whose members include the major oil companies that operate in the Gulf of Mexico (such Shell and Exxon), has expressed strong support for the safety case regime. In its response to the European Commission’s published draft legislative proposals to modify offshore safety case regulations, Oil & Gas UK noted that those proposals would undermine the “proactive, flexible and responsive approach to managing risks, borne out of the lessons learnt from Piper Alpha as well as the evolving nature of the offshore oil and gas business itself.”95 In the wake of the Macondo incident in the Gulf of Mexico, the UK government directed Professor Geoffrey Maitland of Imperial College London to lead an independent review of the offshore safety case regime in the UK.96 In the report stemming from the review, which highlighted strengths of the safety case regime as well as recommendations for improvement, Professor Maitland commended the UK’s “‘goal-setting’ safety regime and its ability to foster innovation and continuous improvement in process integrity…”97 and noted that the UK authorities, including the HSE, are held in high regard by both the UK operators and international observers.98

89 Ibid at 276 and 277. 90 Ibid at 282. 91 Ibid at 283 and 284. 92 The 1992 Regulations have since been replaced by the Offshore Installations (Safety Case) Regulations 2005, which were effective as of April 6, 2006. The objective of the revisions in 2005 was “to improve the effectiveness of the regulations whilst at the same time reducing the burden of three yearly resubmissions.” Oil & Gas UK. Piper Alpha: Lessons Learnt; 2008. 93 HSE. A Guide to the Offshore Installations (Safety Case) Regulations 2005: Guidance on Regulations; 2006; p

  1. http://www.hse.gov.uk/pubns/priced/l30.pdf (accessed May 7, 2013).

94 See http://www.oilandgasuk.co.uk/aboutus/aboutus.cfm (accessed December 10, 2013). 95 Oil & Gas UK. European Commission Proposed Regulation on Offshore Safety and Related Issues: Oil & Gas UK Position Paper. November 2011; p 1. http://www.oilandgasuk.co.uk/ProposedEURegulation.cfm (accessed December 10, 2013). 96 Maitland, Geoffrey. Offshore Oil and Gas in the UK: an independent review of the regulatory regime. December 2011. https://www.gov.uk/government/uploads/system/uploads/attachment_data/file/48252/3875- offshore-oil-gas-uk-ind-rev.pdf (accessed December 10, 2013). 97 Ibid at 3. 98 Ibid at 3.

Chevron Richmond Refinery Regulatory Report December 2013

26 DRAFT FOR PUBLIC COMMENT 3.2.2 Global Analysis of Safety Case Implementation 3.2.2.1 Australia 3.2.2.1.1 Offshore Following the Piper Alpha disaster in 1988, the then Australian Commonwealth Minister for Resources at the time, Senator Peter Cook, formed a Consultative Committee on Safety in the Offshore Petroleum Industry to advise him on safety issues surrounding offshore operations in Australia. In 1991, the Committee released its Report of the Consultative Committee on Safety in the Offshore Petroleum Industry.99 In the report, the Committee examined the circumstances, causes, and recommendations described in both the Cullen Report and Esso Australia’s100 investigation report on a fire that occurred on the Tuna platform in April 1989 in Bass Strait that injured four individuals. The Committee noted that while there were many differences between the two incidents, they “both demonstrated the need for greater attention to the management of safety in a number of areas of offshore operations.”101 They pointed to the safety case as an important regulatory concept that should be applied to oil and gas operations in Australian waters, and concluded by recommending that the safety case concept described by Lord Cullen and carried out onshore by the Seveso Directive and CIMAH regulations be adopted for Australian offshore petroleum operations.102 It would “require the operator of a facility to formally document how safety is to be managed within the facility, [and] [] demonstrate that the major hazards of the installation have been identified and appropriate controls provided…”103 The Committee also recommended the implementation of both prescriptive and “objective” regulations.104 At that time, offshore petroleum safety was the joint responsibility of the Commonwealth and the States/Northern Territory. Following this inquiry, new Commonwealth regulations were created: for example, Schedule 8 on “Occupational Health and Safety” was added to the Petroleum Submerged Lands Act (PSLA) in 1992 to require safety cases to be developed for all offshore petroleum facilities. The Offshore Petroleum and Greenhouse Gas Storage (Safety) Regulations 2009 set out the requirements for the contents of offshore safety cases. The operator of an offshore petroleum facility must submit a safety case for review and acceptance to the Australian National Offshore Petroleum Safety and Environmental Management Authority (NOPSEMA), the Australian Commonwealth Statutory Agency charged with regulating the health and safety, structural integrity, and environmental management of all offshore petroleum facilities in Australian Commonwealth waters, and in coastal waters where State powers have been reduced. NOPSEMA accepts a safety case “if it is satisfied that the arrangements set out in the document demonstrate that the risks will be reduced to…ALARP.”105

99 See http://www.mrt.tas.gov.au/mrtdoc/petxplor/download/OR_0935/OR_0935.pdf (accessed May 8, 2013). 100 Esso was an oil and gas company in Australia that was sold to Mobil Oil Corporation in 1990. It is now part of Exxon Mobil. See http://www.exxonmobil.com/Australia-English/PA/about_who_history_esso.aspx (accessed May 8, 2013). 101 Report of the Consultative Committee on Safety in the Offshore Petroleum Industry, 1991; p 2. See http://www.mrt.tas.gov.au/mrtdoc/petxplor/download/OR_0935/OR_0935.pdf (accessed May 8, 2013). 102 Ibid at 25. 103 Report of the Consultative Committee on Safety in the Offshore Petroleum Industry, 1991; p 3. See http://www.mrt.tas.gov.au/mrtdoc/petxplor/download/OR_0935/OR_0935.pdf (accessed May 8, 2013). 104 Ibid. 105 See http://www.nopsema.gov.au/safety/safety-case/what-is-a-safety-case/ (accessed July 15, 2013).

Chevron Richmond Refinery Regulatory Report December 2013

27 DRAFT FOR PUBLIC COMMENT 3.2.2.1.2 Onshore In 1998, Esso Australia’s gas plant at Longford in Victoria suffered a major release and fire caused by cold temperature embrittlement due to a process upset and lack of engineering support for diagnosis, which resulted in two fatalities, eight additional injuries, and cut the State of Victoria’s gas supply for two weeks causing major industrial disruption and workforce stand downs. While the safety case at this time was required for offshore operations in Australia, onshore facilities like the Longford plant were subject only to prescriptive provisions contained within the Victoria Occupational Health and Safety Act 1985. In its report on the incident, the Royal Commission concluded that all major hazard facilities in Victoria should be required to develop and submit a safety case to the appropriate regulatory authority. In 1996, Australia’s National Occupational Health and Safety Commission106 (NOHSC) recommended the safety case be adopted for all major onshore hazard facilities in Australia, and in 2002 NOHSC established a National Standard for the Control of Major Hazard Facilities and a National Code of Practice for the Control of Major Hazard Facilities.107 The Standard states that operators of major hazard facilities “shall provide the relevant public authority with a safety report…” that, among other things, identifies the type, relative likelihood and consequences of major accidents that might occur, and provides details of the safety management system (SMS) for that facility.108 In addition, operators of major hazard facilities must identify all major hazards and the risks associated with those hazards, and minimize each risk “so far as practicable.”109 According to the Australian Safety and Compensation Council’s 2004 Annual Situation Report for the National Standard for the Control of Major Hazard Facilities, all Australian jurisdictions were expected to have the standard in place before the end of 2005, roughly three years after its inception.110 3.2.2.2 Norway Following the capsizing of the Alexander Kielland111 in 1980, Norway moved in a direction similar to the European Commission and developed performance-based regulations focused on major accident

106 In 1985 The National Occupational Health and Safety Commission (NOHSC) was established as a tripartite body to develop, facilitate and implement a unified national approach to occupational health and safety in Australia. On January 1, 2006, NOHSC was replaced by the Australian Safety and Compensation Council (ASCC). On March 31, 2009, the ASCC was abolished and replaced with Safe Work Australia. Safe Work Australia was established by the Safe Work Australia Act 2008 with the authority to help develop policy to improve worker health, safety, and compensation across Australia. It does not regulate work health and safety laws; rather it develops national policy. See http://www.safeworkaustralia.gov.au/sites/swa/about/pages/about (accessed May 8, 2013). 107 National standards are documents which prescribe preventative action to avert occupational deaths, injuries and diseases; national codes of practice are documents prepared for the purpose of advising employers and workers of acceptable ways of achieving national standards. National Standard for the Control of Major Hazard Facilities [NOHSC: 1014(2002)], p 2. http://www.safeworkaustralia.gov.au/sites/SWA/about/Publications/Documents/271/NationalStandard_ControlMajo rHazardFacilities_NOHSC_1014-2002_PDF.pdf (accessed May 8, 2013). 108 Ibid at 13. 109 Ibid at 12. 110Australian Safety and Compensation Council. Major Hazard Facilities Annual Situation Report; 2004; p1. http://www.safeworkaustralia.gov.au/sites/SWA/about/Publications/Documents/475/MHFAnSituationReport_2004. pdf (accessed May 8, 2013). 111 The Alexander Kielland was a flotel for housing workers. A total of 212 people were on board when it capsized near the Edda platform in the Ekofisk area of the North Sea on March 27, 1980. As a result of this incident, 123 individuals lost their lives and only 89 survived.

Chevron Richmond Refinery Regulatory Report December 2013

28 DRAFT FOR PUBLIC COMMENT prevention. Although the country did not adopt the safety case regulatory regime per se, the current regulatory approach implements many similar elements. Currently in Norway, the Petroleum Safety Authority112 (PSA) regulates safety for activities at onshore and offshore major hazard facilities, and requires the responsible party113 to reduce risk “to the extent possible,” and “select technical, operational and organisational solutions that reduce the probability that harm, errors and hazard and accident situations occur.”114 This concept is akin to ALARP whereby companies choose the solutions and barriers that have the greatest risk-reducing effect, provided the costs are not significantly disproportionate to the risk reduction achieved.115 However, unlike the UK and Australia, PSA regulations do not require the submission of a safety case report by the operator of a facility, although facilities are still expected to develop them and make them available to the regulator upon request for auditing purposes. Rather, PSA “supervises” industry, as explained in the following: Supervision involves much more than audits offshore or on land. It embraces the total contact between the regulator and the regulated. It covers everything which gives the PSA the necessary basis to determine whether the companies are accepting their responsibility to operate acceptably in all phases. Supervisory activities include investigations, considering consent applications and meetings with the industry.116 As will be discussed below, because the safety case regulatory approach requires the regulator to conduct detailed assessments of safety case reports and auditing of facilities against the safety case, its implementation requires substantial funding to support and maintain a sufficient number of highly experienced and competent staff. 3.2.2.3 The United States Despite this international shift to the safety case regime and even though major oil companies that operate globally both onshore and offshore have expressed their support for the safety case regime,117 the US has

112 The Petroleum Safety Authority (PSA) is “the regulatory authority for technical and operational safety and for the working environment.” PSA was created in 2004 as a result of a government decision to split the Norwegian Petroleum Directorate (NPD) into two parts. See http://www.ptil.no/main-page/category9.html (accessed May 8, 2013). 113 PSA defines a “responsible party” as “[t]he operator and others participating in activities covered by these regulations, without being a licensee or owner of an onshore facility.” Regulations Relating to Health, Safety and the Environment in the Petroleum Activities and at Certain Onshore Facilities (The Framework Regulations); Section 6(a). Definitions. http://www.ptil.no/framework-hse/category403.html (accessed November 26, 2013). 114 PSA. Regulations Relating to Health, Safety and the Environment in the Petroleum Activities and at Certain Onshore Facilities (The Framework Regulations); Section 11, Risk Reduction Principles. http://www.ptil.no/framework-hse/category403.html (accessed November 26, 2013). 115 Ibid. 116 http://www.ptil.no/supervision/what-is-supervision-article8519-88.html (accessed June 3, 2013). 117 Shell Geelong Refinery Plant Manager Huck Poh has stated, “As a Major Hazard Facility, Shell Geelong Refinery and Lara Terminal is required to submit a Safety Case for assessment by Safe Work Victoria. This document is a summary of that Safety Case and explains the potential impact of the facility on our neighbours and the community. We take a systematic approach to managing safety and preventing incidents that place our people, our neighbours, the Geelong community, the environment and our facilities at risk. This is reflected in our Safety Management System and the approach that has been undertaken for the development and review of the Safety Case. Shell is committed to achieving continuous Health, Safety, Security and Environment (HSSE) performance improvement. There are ongoing review and revision activities to ensure our analyses remain relevant and reflect

Chevron Richmond Refinery Regulatory Report December 2013

29 DRAFT FOR PUBLIC COMMENT persisted in the use of a more activity-based regulatory scheme that does not contain a specific risk reduction target and that lacks the ability to adapt to advancing technology and recently developed industry standards. Due to the major potential hazards present in onshore and offshore oil and gas operations, these sectors should have in place adaptable safety regimes that adequately engage companies and their employees in continuous improvement and risk reduction. As the CSB has devoted extensive time and resources to studying and analyzing the regulation of offshore oil and gas facilities in the US as a result of its Macondo incident investigation, this report will focus on the regulation of onshore oil and gas operations in the US and California. On October 23, 1989, a massive explosion and fire occurred at the Phillips 66 Company’s Houston Chemical Complex in Pasadena, Texas, resulting in 23 fatalities and injuring more than 130. In response, the U.S. Department of Labor issued a report to the President and declared, among other things, that the U.S. Occupational Safety and Health Administration (OSHA) would “expedite completion of its rulemaking requiring employers to implement comprehensive chemical process safety management plans for hazardous chemical processes.”118 Sparked by a number of serious accidents, including the Phillips 66 incident and the 1984 toxic release in Bhopal, India, which resulted in several thousand known fatalities, OSHA published in the Federal Register (55 FR 29150) on July 17, 1990, a proposed standard containing requirements for the management of hazards associated with processes using highly hazardous chemicals.119 Soon after, the Clean Air Act (CAA) Amendments (CAAA) of 1990 were adopted by Congress, which resulted in the creation of the CSB and authorized the first federal regulations specifically designed to prevent major chemical accidents that threaten workers, the public, and the environment: OSHA’s Process Safety Management (PSM) standard and the U.S. Environmental Protection Agency’s (EPA’s) Risk Management Program. 3.2.2.3.1 OSHA PSM Standard Section 304 of the CAAA mandated that OSHA develop “a chemical process safety standard designed to protect employees from hazards associated with accidental release of highly hazardous chemicals in the workplace.”120 OSHA responded by adopting 29 CFR §1910.119 Process Safety Management of Highly

the current status of operations and our risk reduction measures are consistent with latest industry practice. This commitment to continuous improvement is reflected in the Shell HSSE Policy and supported by our HSSE results.” See http://s04.static-shell.com/content/dam/shell-new/local/country/aus/downloads/geelong/safety-case- summary.pdf p3. (accessed December 10, 2013). Esso Longford Plant Manager Monte Olson has stated that “[t]he Safety Case is a systematic and comprehensive review of our operations and processes which includes the identification of potential major incidents that could occur, assesses the risks associated with these major incidents and demonstrates the controls we have in place to manage these risks to as low as reasonably practicable.” See http://www.exxonmobil.com/Australia-English/PA/Files/publication_Longford_Safety_Case_2013.pdf p5. (accessed December 10, 2013) 118 Dole, Elizabeth. Phillips 66 Company Houston Chemical Complex Explosion and Fire: Implications for Safety and Health in the Petrochemical Industry, A Report to the President; April 1990; p ix. http://ncsp.tamu.edu/reports/phillips/first%20part.pdf (accessed August 6, 2013). 119 Preamble to Process Safety Management of Highly Hazardous Chemicals; Explosives and Blasting Agents. Section 1 – I. Background (March 4, 1992). See http://www.osha.gov/pls/oshaweb/owadisp.show_document?p_table=PREAMBLES&p_id=1039 (accessed May 10, 2013). 120 Clean Air Act Amendments of 1990. Section 304(a). November 5, 1990. See http://www.epa.gov/air/caa/caaa.txt (accessed May 10, 2013).

Chevron Richmond Refinery Regulatory Report December 2013

30 DRAFT FOR PUBLIC COMMENT Hazardous Chemicals (PSM standard) in 1992. This standard applies to a process121 involving a chemical at or above the listed threshold quantity (also known as a highly hazardous chemical), or flammables in a quantity of 10,000 pounds or more.122 It contains 14 elements with broad requirements to implement management systems, identify and control hazards, and prevent “catastrophic releases of highly hazardous chemicals.” While the PSM standard was intended to be performance-based and does contain some goal- setting elements, a majority of the standard is activity-based, and there is no general duty requirement under the PSM standard to reduce risks to a certain extent or prevent catastrophic accidents. As will be discussed at length in Section 4.3, the PSM standard has essentially remained stagnant since its inception in 1992. According to Center for Chemical Process Safety (CCPS), the PSM standard has resulted “in a minimum cost, compliance-based approach to managing process safety… ‘If [it] isn’t a regulatory requirement, I’m not going to do it!’”123 A key provision of the PSM standard is the process hazard analysis (PHA) of covered processes. 124 PHA requirements include a review of the process to identify, evaluate, and control the hazards, and an evaluation of the consequences of failure of those controls.125,126 The PHA required by the OSHA PSM standard is an example of a goal-setting requirement in that it allows for a variety of hazard analysis methodologies to be performed to satisfy the requirement. However, the element is activity-based in that completing a PHA for each covered process and updating it at least every five years is satisfactory. The regulator is not responsible for evaluating the effectiveness of controls or safeguards, and there is no requirement to reduce risks to a certain extent such as ALARP. Thus, the resulting PHA that meets the regulatory requirements of “controlling” hazards may actually inadequately identify or mitigate the hazards. In addition, there is no requirement for employers to submit their PHAs to the regulator for review. In most cases, this means the regulator will not review these PHAs until there is a significant process accident, a complaint, or a (rare) planned inspection.

Another key element of the PSM standard, the Management of Change (MOC) provision, requires the development of written procedures “to manage changes to process chemicals, technology, equipment, and procedures…”127 The procedures must consider, among other things, the technical basis for a proposed change and its potential impact on safety and health.128 Historically, the MOC requirement has been

121 The PSM standard defines “process” as “any activity involving a highly hazardous chemical including any use, storage, manufacturing, handling, or the on-site movement of such chemicals, or combination of these activities.” 29 CFR §1910.119(b) (1992). 122 29 CFR §1910.119(a)(1) (1992). This standard also applies to the manufacture of explosives and pyrotechnics in any quantity [29 CFR §1910.109(k)(2) & (3)]. 123 CCPS. Guidelines for Risk Based Process Safety. 2007; p 2. 124 A Process hazard analysis is a thorough, orderly, systematic approach for identifying, evaluating, and controlling hazards of processes involving highly hazardous chemicals. The employer must perform an initial process hazard analysis on all processes covered by the PSM standard and all process hazard analyses must be updated and revalidated, based on their completion date, every five years. See http://www.osha.gov/doc/outreachtraining/htmlfiles/psm.html (accessed May 10, 2013). 125 29 CFR §1910.119(e) (1992). 126 The other elements of the PSM standard are process safety information, operating procedures, employee participation, training, contractor safety, pre-startup safety review, mechanical integrity, hot work permits, management of change, incident investigation, emergency planning and response, and compliance audits. The 14th “element” is mainly a requirement that maintaining trade secrecy not interfere with an employer’s compliance with the other 13 elements. 127 29 CFR §1910.119(l)(1) (1992). 128 Id at (l)(2)(i) and (ii) (1992).

Chevron Richmond Refinery Regulatory Report December 2013

31 DRAFT FOR PUBLIC COMMENT treated and enforced as an activity-based requirement as well. For example, when the BP Texas City refinery explosion and fire occurred on March 23, 2005, all 15 fatalities and many of the 180 injuries occurred in or around nine contractor trailers that were sited near process areas and as close as 121 feet to the isomerization (ISOM) unit where the incident occurred. The refinery had been using trailers as temporary office spaces for several years. The refinery addressed facility siting for trailers during its 2004 MOC for an upcoming 2005 turnaround. The MOC form indicated that a double-wide mobile office trailer would be temporarily sited in the open area between the ISOM and naphtha desulfurization units (NDU) for use during the upcoming turnaround, to be removed at the end of April 2005. However, the MOC did not analyze siting hazards; rather the MOC team attached a drawing showing the proposed interior configuration of the trailer and measured its location from the catalyst warehouse.129 In early 2005, eight other trailers were sited between the ISOM and NDU without even conducting an MOC. The CSB pointed out in its Urgent Recommendations stemming from the Texas City incident that these trailers could have been easily relocated to less hazardous sites, and BP did so following the incident.130 Despite this fact, BP’s siting policy considered that utilizing trailers in this way posed little or no danger to occupants, which conformed with the American Petroleum Institute’s (API) Recommended Practice (RP) 752, Management of Hazards Associated with Location of Process Plant Buildings.

Although the MOC failed to identify or analyze hazards stemming from siting trailers so close to process areas, OSHA did not cite BP for conducting a poor MOC following the incident, as merely completing the MOC satisfied the requirements of the PSM standard. As it would have been very practical to move the trailers to a safer location, a regulator under the safety case regulatory regime would have the ability to require BP to do just that to reduce risks to ALARP.

The OSHA PSM standard includes requirements for two of its 14 elements – mechanical integrity and process safety information (PSI) – to comply with recognized and generally accepted good engineering practices, or RAGAGEP.131 RAGAGEPs are technologically focused, with no emphasis on organizational, human factors, or culture-based measures. OSHA developed the mechanical integrity RAGAGEP requirement to “make sure that process equipment is inspected and tested properly, and that the inspections and tests are performed in accordance with appropriate codes and standards.”132 OSHA has recognized a number of practices, guidelines, and standards as RAGAGEPs, including the American Society of Civil Engineers (ASCE), Design of Blast Resistant Buildings in Petrochemical Facilities, the

129 To learn more about the PHA and MOC processes relating to the BP Texas City Refinery, see the CSB BP Texas City Final Investigation Report at http://www.csb.gov/assets/1/19/CSBFinalReportBP.pdf (accessed October 24. 2013). 130 See CSB Urgent Trailer Siting Recommendations at http://www.csb.gov/assets/1/19/BP_Recs_2.pdf (accessed October 24. 2013). 131 RAGAGEPs “are engineering, operation, or maintenance activities based on established codes, standards, published technical reports or recommended practices (RP) or a similar document. RAGAGEPs detail generally approved ways to perform specific engineering, inspection or mechanical integrity activities, such as fabricating a vessel, inspecting a storage tank, or servicing a relief valve.” OSHA Instruction CPL 03-00-004. June 7, 2007. https://www.osha.gov/pls/oshaweb/owadisp.show_document?p_id=3589&p_table=DIRECTIVES (accessed August 13, 2013). 132 OSHA. Preamble to 29 CFR Part 1910, Process Safety Management of Highly Hazardous Chemicals, Section 3, Title III. Summary and Explanation of the Final Rule, 1992. Available at http://www.osha.gov/pls/oshaweb/owadisp.show_document?p_table=PREAMBLES&p_id=1041 (accessed June 6, 2013).

Chevron Richmond Refinery Regulatory Report December 2013

32 DRAFT FOR PUBLIC COMMENT Department of Defense, TMS-1300 Structures to Resist the Effects of Accidental Explosions, and the American Petroleum Institute (API) Recommended Practice (RP) 520: Sizing, Selection, and Installation of Pressure-Relieving Devices in Refineries.133 Unlike other regulators such as the HSE, OSHA has not compiled a comprehensive list of good practices, or RAGAGEPs, for companies to utilize during operations, and the CSB has only identified two OSHA Letters of Interpretation regarding implementation of RAGAGEP in PSM. According to CCPS, “[o]rganizations lack a thorough understanding of recognized and generally accepted good engineering practices and are inconsistent in interpreting and applying them.”134 In addition, key PSM elements such as PHA, incident investigation, and MOC do not reference RAGAGEP, and have not kept up to date with good practice guidelines, including CCPS’ Guidelines for Risk Based Process Safety, which addresses 20 PSM elements for process safety, including human factors, workforce involvement, and safety culture.

Historically, OSHA has primarily enforced135 RAGAGEP reactively, and may cite companies for violations of RAGAGEPs following an incident. For example, following the BP Texas City Refinery incident, OSHA issued BP hundreds of citations, some of which covered BP’s willful violations of API 520 and the American Society of Mechanical Engineers (ASME) Boiler and Pressure Vessel Code, both considered by OSHA to be RAGAGEPs. Following the Chevron incident, California’s Division of Occupational Safety and Health (Cal/OSHA) issued Chevron two willful citations for allegedly not complying with API RP 939(c), Guidelines for Avoiding Sulfidation (Sulfidic) Corrosion Failures in Oil Refineries and Chevron’s own internal corrosion mitigation plan as RAGAGEPs (this will be discussed in greater detail in Section 5.1.2.2).

  1. 2.2.3.2 U.S. Environmental Protection Agency Risk Management Program

Section 301(r) of the CAAA called for EPA to develop regulations related to the prevention and detection of accidental releases for regulated substances, including requiring owners or operators of stationary sources that have regulated substances present to prepare and implement a “risk management plan to detect and prevent or minimize accidental releases of such substances from the stationary source…”136 The risk management plan would require a “hazard assessment to assess the potential effects of an accidental release of any regulated substance.”137 In 1996, EPA promulgated the Risk Management Program regulations at 40 CFR Part 68, which went into effect in 1999.

133 All three are cited in OSHA Letter of Interpretation. Applicability of the PSM standard’s mechanical integrity requirements to refinery structures, February 1, 2010. http://www.osha.gov/pls/oshaweb/owadisp.show_document?p_table=INTERPRETATIONS&p_id=27443 (accessed June 6, 2013). 134 CCPS. Guidelines for Risk Based Process Safety. 2007; p 2. 135 An exception to this would be OSHA’s NEP that was implemented from 2007 to 2011, where OSHA inspectors cited to RAGAGEP following NEP audits. 136 Clean Air Act Amendments of 1990. Section 301(r)(7)(B)(ii). November 5, 1990. See http://www.epa.gov/air/caa/caaa.txt (accessed May 10, 2013). 137 Clean Air Act Amendments of 1990. Section 301(r)(7)(B)(ii)(I). November 5, 1990. See http://www.epa.gov/air/caa/caaa.txt (accessed May 10, 2013).

Chevron Richmond Refinery Regulatory Report December 2013

33 DRAFT FOR PUBLIC COMMENT The EPA’s Risk Management Program requires facilities that contain more than the threshold quantity of any of the 77 listed toxic chemicals or 63 flammable substances138 to prepare and submit to the regulating agency emergency contact information, descriptions of processes and hazardous chemicals onsite, an accident history, and worst-case release scenarios.139 The regulation defines three different Program levels (Program 1, 2, or 3) based on a process unit’s potential for impact to the public and the requirements to prevent accidents.140 Program 3 processes are subject to additional, more stringent requirements to prevent accidents similar to those of the OSHA PSM standard. Program 3 facilities must implement elements of a prevention program, including: process safety information (PSI), PHA, standard operating procedures (SOPs), training, mechanical integrity, compliance audits, incident investigations, MOC, pre-startup reviews, employee participation, and hot work permits. These prevention program elements are based primarily on the OSHA PSM standard, and much of the language contained in each element is identical to the PSM standard. As such, the Risk Management Program regulations contain the same RAGAGEP requirements for mechanical integrity and PSI as the OSHA PSM standard for covered facilities. For example, 40 CFR §68.48 requires an owner or operator to “ensure that the process is designed in compliance with recognized and generally accepted good engineering practices [RAGAGEP].”141 Like OSHA, the EPA is able to cite facilities for failure to comply with RAGAGEP following an incident, but does not maintain a list of RAGAGEPs for reference.

Finally, each covered facility must submit a risk management plan (RMP) to EPA for all covered processes142 and update and resubmit these plans at least once every five years, or whenever a major accident occurs or the emergency contact information changes. Completing and submitting the RMP satisfies the regulatory requirement; again, the effectiveness of the RMP in risk reduction is not assessed by the EPA, rendering this another activity-based requirement for a covered facility. There is no approval of the RMP by the EPA, and there is no additional duty on the facility to implement what it says it is doing in the RMP, unlike the safety case regulatory regime.

Any facility with one or more covered processes must include in its RMP an executive summary the registration for the facility; the certification statement; a worst-case scenario for each process involving flammables or toxics; the five-year accident history for each process; information concerning emergency response at the facility; at least one alternative release scenario analysis for each regulated toxic substance or flammable; a summary of the prevention program for each Program 2 process; and a summary of the prevention program for each Program 3 process.143

The CSB found in its BP Texas City Investigation Report that as of March 2007, the RMP regulation had focused primarily on reviewing the submitted RMPs and required updates by covered facilities. The EPA

138According to 40 CFR §68.10(a), “[a]n owner or operator of a stationary source that has more than a threshold quantity of a regulated substance in a process, as determined under §68.115, shall comply with the requirements of this part no later than the latest of the following dates…” 139 See 40 CFR §68.12. General Requirements. 140 See 40 CFR §68.10. Applicability. 141 40 CFR §68.48(b) (1999). Additionally see 40 CFR §68.56 (d) which requires the owner or operator‘s inspection and testing procedures to “follow recognized and generally accepted good engineering practices.” 142 40 CFR §68.150 (1999). 143 EPA Office of Solid Waste and Emergency Response. General Guidance on Risk Management Programs for Chemical Accident Prevention (40 CFR Part 68); March 2009; pp 9-1 and 9-2. See http://www.epa.gov/osweroe1/docs/chem/Toc_final.pdf (accessed May 14, 2013).

Chevron Richmond Refinery Regulatory Report December 2013

34 DRAFT FOR PUBLIC COMMENT The NRC and NASA both implement safety case regulatory approaches in the US to regulate their respective highly hazardous activities. Office of Inspector General (OIG) concluded in 2009 that over half of the RMP-covered facilities identified in the US as high-risk144 had never received an on-site inspection or audit, and over 65 percent of all active RMP facilities had not received an on-site inspection or audit since inception of the RMP program in 1999.145 The EPA OIG also noted that of the 296 uninspected high-risk facilities managed by EPA, 151 of these could each impact 100,000 people or more in a worst-case accident scenario.146

  1. 2.2.3.3 Safety Case in the United States

In contrast to its mainly activity-based regulation of hazardous chemicals, including oil and gas operations, the US has adopted a more goal-based regulatory approach for its nuclear and aeronautics and space science sectors. The U.S. Nuclear Regulatory Commission (NRC) was an early adopter of goal or performance-based regulation, which it defines as “[a] regulatory approach that focuses on desired, measureable outcomes, rather than prescriptive processes, techniques, or procedures…[and] leads to defined results without specific direction regarding how those results are to be obtained.”147 According to the NRC, performance-based regulations permit licensees to “have flexibility to determine how to meet the established performance criteria in ways that encourage and reward improved outcomes.”148 The NRC’s Reactor Oversight Process, the means by which it achieves its mission of public health and safety in commercial nuclear power plant operations, is its primary performance-based regulation.149 It uses seven “cornerstones,” such as mitigating systems and barrier integrity, to monitor three performance areas (reactor safety, radiation safety, and security safeguards).150 Licensee performance data, inspection plans, quarterly assessments, and assessment and inspection responses are tied to each performance area and several cross-cutting objectives, such as worker involvement and human performance.151 Licensees are permitted to choose the precise methods they use to meet overarching performance goals, which are guided by their duty to reduce risks to as low as

144 A high-risk facility is one that meets one of more of the following characteristics established by the EPA Office of Emergency Management: 1) Facilities whose reported RMP worst-case scenario population exceeds 100,000 people; 2) Any RMP Program facility with a hazard index greater than or equal to 25; and/or 3) Facilities that have had one or more significant accidental releases within the previous five years. See “EPA Office of Inspector General, “Improvements Needed in EPA Training and Oversight for Risk Management Program Inspections.” March 21, 2013; Page 5. Available at http://www.epa.gov/oig/reports/2013/20130321-13-P-0178.pdf (accessed June 11, 2013). 145 EPA OIG. Evaluation Report: EPA Can Improve Implementation of the Risk Management Program for Airborne Chemical Releases; February 10, 2009; p 15. 146 Ibid. 147 See NRC Glossary, available at http://www.nrc.gov/reading-rm/basic-ref/glossary/performance-based- regulation.html (accessed June 10, 2013). 148 US NRC NUREG/BR-0303. Guidance for Performance-Based Regulation (2002). http://www.nrc.gov/reading- rm/doc-collections/nuregs/brochures/br0303/br0303.pdf (accessed June 13, 2013). 149 http://www.nrc.gov/about-nrc/regulatory/risk-informed/concept/performance.html#example (accessed June 13, 2013). 150 NRC Reactor Oversight Process publication (2006), available at http://pbadupws.nrc.gov/docs/ML0708/ML070890365.pdf (accessed June 13, 2013). 151 NRC Reactor Oversight Process publication (2006), available at http://pbadupws.nrc.gov/docs/ML0708/ML070890365.pdf (accessed June 13, 2013).

Chevron Richmond Refinery Regulatory Report December 2013

35 DRAFT FOR PUBLIC COMMENT reasonably achievable, or ALARA.152,153 The NRC has stated that this flexibility is one of the main reasons that its regulatory philosophy encourages continuous improvement.154

The National Aeronautics and Space Administration (NASA) has the goal of implementing a safety system that is “as safe as reasonably practicable,” or ASARP,155 which it considers to be closely related to ALARP. NASA relies on a risk-informed safety case, or RISC,156 to ensure that the system’s safety objectives, goals, and thresholds have been achieved, and that safety risk is as low as possible within reasonable impacts on cost, schedule, and performance.157

152 US NRC NUREG/BR-0303, Guidance for Performance-Based Regulation (2002). http://www.nrc.gov/reading- rm/doc-collections/nuregs/brochures/br0303/br0303.pdf (accessed June 13, 2013). 153 ALARA “means making every reasonable effort to maintain exposures to radiation as far below the dose limits in this part as is practical consistent with the purpose for which the licensed activity is undertaken, taking into account the state of technology, the economics of improvements in relation to state of technology, the economics of improvements in relation to benefits to the public health and safety, and other societal and socioeconomic considerations, and in relation to utilization of nuclear energy and licensed materials in the public interest.” 10 CFR §20.1003 (2007). 154 US NRC NUREG/BR-0303, Guidance for Performance-Based Regulation (2002). http://www.nrc.gov/reading- rm/doc-collections/nuregs/brochures/br0303/br0303.pdf 155 NASA defines ASARP as “a fundamental principle of adequate safety. A determination that a system is ASARP entails weighing its safety performance against the sacrifice needed to further improve it. The system is ASARP if an incremental improvement in safety would require a disproportionate deterioration of system performance in other areas.” NASA/SP-2010-580, NASA System Safety Handbook, Volume 1, System Safety Framework and Concepts for Implementation; November 2011; p 5. http://ntrs.nasa.gov/archive/nasa/casi.ntrs.nasa.gov/20120003291_2012003429.pdf (accessed June 10, 2013). 156 NASA defines RISC as “a structured argument, supported by a body of evidence that provides a compelling, comprehensive and valid case that a system is or will be adequately safe for a given application in a given environment. This is accomplished by addressing each of the operational safety objectives that have been negotiated for the system, including articulation of a roadmap for the achievement of safety objectives that are applicable to later phases of the system life cycle. The term ‘risk-informed’ is used to emphasize that a determination of adequate safety is the result of a deliberative decision making process that necessarily entails an assessment of risks and tries to achieve a balance between the system’s safety performance and its performance in other areas.” Ibid at 13. 157 Ibid at xiii.

Chevron Richmond Refinery Regulatory Report December 2013

36 DRAFT FOR PUBLIC COMMENT 4.0 Key Features of an Effective Safety Case Regulatory Regime

Following the Macondo disaster, the National Commission on the Macondo Oil Spill and Offshore Drilling158 made a recommendation in its Report to the President159 for the US to “develop a proactive, risk-based performance approach specific to individual facilities, operations and environments, similar to the ‘safety case’ approach in North Sea.”160 Despite the major potential hazards that are present in both onshore and offshore oil and gas operations, the safety case regime has not been implemented in the US for either sector. The US has instead implemented for major hazards at onshore facilities a more activity- based approach, resulting in static regulations such as the PSM and RMP regulations that have not seen significant improvements161 since their inception, despite advances in technology and good industry practice. According to Dr. Hopkins and other renowned experts in the field, it is essential for an effective major accident prevention safety regime to take the form of a safety case, with adaptable goal-setting regulations that facilitate innovation and sustainability, and that drive industry to continuously improve and reduce risks to ALARP. To accomplish this, the regime must utilize sufficient numbers of highly competent personnel to effectively collect or promote industry use of process safety indicators162 and to provide knowledgeable oversight of industry operations. The CSB has determined that there are several key features of an effective major accident prevention regulatory approach such as the safety case regime:  Duty Holder Safety Responsibility, including a Written Case for Safety  Continuous Risk Reduction to ALARP  Adaptability and Continuous Improvement  Active Workforce Participation  Process Safety Indicators that Drive Performance  Regulatory Assessment, Verification, and Intervention; and an  Independent, Competent, Well-Funded Regulator As will be discussed in Section 5, California’s patchwork of regulations does not effectively implement these features, which are also illustrated in the figure below. Section 4 provides a detailed discussion of these features.

158 President Barack Obama established the National Commission on the BP Macondo Oil Spill and Offshore Drilling through Executive Order 13543 on May 21, 20130 to examine the facts and circumstances concerning the root causes of the Macondo explosion and fire. For more information see http://www.oilspillcommission.gov/page/about-commission (accessed June 17, 2013). 159 Available at http://www.oilspillcommission.gov/final-report (accessed June 17, 2013). 160 National Commission on the BP Macondo Oil Spill and Offshore Drilling. Report to the President: Deep Water, The Gulf Oil Disaster and the Future of Offshore Drilling; January 2011; 252. 161 OSHA did implement changes to 29 CFR §1910.106, creating a new Hazard Communication Standard. However, no changes have been made that impact the management of process safety under PSM. See https://www.osha.gov/dsg/hazcom/ (accessed August 6, 2013). 162 Process safety indicators are also referred to as performance indicators, metrics, key process indicators (KPI), performance measures, indicators, etc.

Chevron Richmond Refinery Regulatory Report December 2013

37 DRAFT FOR PUBLIC COMMENT

Figure 1. Safety Case Attributes. 4.1 Duty Holder Safety Responsibility, including a Written Case for Safety Under the safety case regulatory regime, each individual company is responsible for the safety of each hazardous facility. The onus is on the duty holder163 to prove to the regulator that the company’s processes, methodologies used to assess risks, and reasoning for choosing one control over another have substantially reduced risks to as low as reasonably practicable (ALARP), or equivalent. The duty holder

163 Duty holders are considered to be “those who create and/or have the greatest control of the risks associated with a particular activity. Those who create the risks at the workplace are responsible for controlling them.” HSE. Planning to do business in the UK offshore oil and gas industry? What you should know about health and safety; October 2011; 2. http://www.hse.gov.uk/offshore/guidance/entrants.pdf (accessed June 5, 2013). These entities may include operators, contractors, and subcontractors. According to NOPSEMA, the idea is that those who create the risk must manage it. See http://www.nopsema.gov.au/safety/safety-case/what-is-a-safety-case/ (accessed July15, 2013).

Chevron Richmond Refinery Regulatory Report December 2013

38 DRAFT FOR PUBLIC COMMENT The written safety case report is an evergreen document that must be reviewed and revised so that it reflects the existing hazards. is required to prepare a written case for safety164 (“safety case report”) that identifies the hazards and risks and describes how they will be reduced to ALARP. The HSE has noted that the safety case report “demonstrates that the duty holder has arrangements in place which, if implemented, are capable of achieving compliance with legal objectives set out in other [] regulations…[and] provides a comprehensive core document that can be used as a check by both the duty holder and HSE that the accepted risk control measures and the health and safety management systems are in place and operate as they should.”165 The HSE has also stated: [t]he principal matters to be demonstrated in a safety case are that: a) the management system is adequate to ensure compliance with statutory health and safety requirements; and for management of arrangements with contractors and sub-contractors, b) that adequate arrangements have been made for audit and for audit reporting, [and] c) that all hazards with the potential to cause a major accident have been identified, their risks evaluated, and measures have been, or will be, taken to control those risks to ensure that the relevant statutory provisions will be complied with.166 The safety case report must also demonstrate “how inherently safer design concepts have been applied in the design decisions taken.”167 This principle applies to all stages of the installation’s life cycle, and includes materials selection and managing corrosion in the design. It is also important to note that safety case reports are meant to be evergreen documents that reflect continuous improvement in risk reduction. For onshore operations in the UK, the duty holder is required to review the safety case report during the construction of a new facility, whenever new facts or technical knowledge about safety matters become known, or whenever the operator makes a change to the safety management system that could have significant impacts on the prevention of major accidents.168 The duty holder must revise the safety report to ensure that it “remains up to date and continues to provide an accurate representation of the major accident hazards…and the measures in place to control them.”169 According to HSE guidance

164 The HSE defines “safety case” as “a document that gives confidence to both the duty holder and HSE that the duty holder has the ability and means to control major accident risks effectively. It provides an extra level of regulatory control on top of regulations such as the Offshore Installations (Prevention of Fire and Explosion, and Emergency Response) Regulations 1995 (PFEER) and the Offshore Installations and Wells (Design and Construction, etc) Regulations 1996 (DCR), justified by the major accident potential of the offshore activities within scope.” HSE. A Guide to the Offshore Installations (Safety Case) Regulations 2005: Guidance on Regulations; 2006; p 6. 165 HSE. A Guide to the Offshore Installations (Safety Case) Regulations 2005: Guidance on Regulations; 2006; p

  1. http://www.hse.gov.uk/pubns/priced/l30.pdf (accessed November 13, 2013).

166 HSE. Assessment Principles for Offshore Safety Cases (APOSC); March 2006; p 7. http://www.hse.gov.uk/offshore/aposc190306.pdf (accessed August 6, 2013). 167 Ibid at 16. 168 COMAH Regulations, Part 3, Regulation 8 (1) (a)(b) and (c) (1999). 169 The Competent Authority. Revised guidance for operators of top tier COMAH establishments. Review and revision of COMAH safety reports. December 2009; p 5. http://www.hse.gov.uk/comah/report-review.pdf (accessed November 26, 2013).

Chevron Richmond Refinery Regulatory Report December 2013

39 DRAFT FOR PUBLIC COMMENT on the offshore Safety Case Regulations, safety case reports are “intended to be living documents, kept up to date and revised as necessary during the operational life of the installation.”170 In order for the facility to begin operation or remain in operation, the regulator must “accept” 171 the facility’s safety case report; however, the regulator’s acceptance of a safety case does not license the facility or installation as “fit,”172 nor does it shift the duty of risk control and reduction away from the facility owner or operator and onto the regulator; rather, the duty of major accident prevention and risk reduction to ALARP remains with the duty holder throughout the life of the facility. Following the regulator’s acceptance of the safety case report, the duty holder must ensure that the installation is operated in conformity with the management system and other provisions described in the safety case.173 In the US, facilities commence operation before they are inspected or evaluated for complying with PSM or RMP regulations. In fact, the CSB has investigated incidents where the employer disputed tthat its process was covered by the PSM standard or RMP. Regulators do not evaluate and approve PHAs or other hazard reviews and do not have the authority to license specific facilities for operation, based on the adequacy of their process safety programs. If an operating facility contains processes covered by PSM, the facility must complete mostly activity-based regulatory requirements at least once every five years. Under the PSM standard the employer has no general duty to continually reduce risk or prevent the occurrence of a catastrophic accident. RMP-covered facilities must submit fairly high-level information exhibiting compliance with RMP requirements at least once every five years. While the regulator ensures the RMP has been filed and contains the required sections, there is no analysis of the effectiveness of controls identified in the RMP to mitigate hazards. 4.2 Continuous Risk Reduction to ALARP As discussed above, a majority of the safety case regimes implemented globally impose a duty on owners or operators of covered facilities on and offshore to reduce risks to ALARP or equivalent. The Center for Chemical Process Safety (CCPS) defines ALARP as “a risk reduction goal, where risk reduction efforts are continued until the incremental effort to further reduce risk becomes grossly disproportionate to the level of additional risk reduction.”174 This principle provides the regulator with the main foundation on which to accept or reject a safety case report. In essence, the regulator ultimately determines whether ALARP has been achieved through the authority to accept or reject the safety case report. An advantage

170 HSE. A Guide to the Offshore Installations (Safety Case) Regulations 2005: Guidance on Regulations; 2006; p

  1. http://www.hse.gov.uk/pubns/priced/l30.pdf (accessed May 7, 2013).

171 “Acceptance requires satisfaction with the duty holder’s approach to identifying and meeting health and safety needs…HSE ‘accepts’ the validity of the described approach as being capable, if implemented as described, of achieving the necessary degree of risk control, but HSE does not confirm the outcomes of that approach.” Therefore, “HSE will accept a safety case or a revision…when duty holders demonstrate and describe specified matters to HSE’s satisfaction. Acceptance will be based on HSE’s judgment that the arrangements and measures described in the safety case taken as a whole are likely to achieve compliance if implemented as described. To give acceptance HSE does not need to be satisfied that compliance will be achieved…” Ibid at 6. 172 TAF Powell, SPE, UK Health & Safety Executive. US Voluntary Semp Initiative: Holy Grail or Poisoned Chalice? Proceedings of the Offshore Technology Conference, Houston, Texas, May 8-9, 1996; p 8. 173 Ibid at 7. 174 Center for Chemical Process Safety (CCPS). Inherently Safer Chemical Processes – A Life Cycle Approach; 2nd ed., 2009; p 46.

Chevron Richmond Refinery Regulatory Report December 2013

40 DRAFT FOR PUBLIC COMMENT Risk reduction to ALARP requires at least a demonstration of relevant good practice. The regulator may require the duty holder to implement additional controls if they result in further risk reduction. of ALARP as opposed to a prescriptive or activity-based approach is that ALARP should result in the continuous reduction of risk and is not predicated on a specific risk acceptance target.175 In reviewing the safety case report, the regulator may accept the application of relevant good practice as a sufficient demonstration of ALARP.176 As the HSE notes, “the measures in place to prevent or limit major accidents should be described in the safety report and be at least to ‘relevant good practice.’”177 According to Dr. Hopkins, the duty of ALARP “provides leverage for the regulator…[i]f an operator wishes to adopt a procedure or a standard that falls short of good or best practice, the regulator can reject it on the grounds that it does not reduce the risk as low as reasonably practicable.”178 As noted above, regulators such as HSE provide guidance on what is considered good practice, and publish documents containing good practice standards to assist operators with applying this concept. However, the duty holder must make the case for the standard or practice being utilized, and the regulator may determine that applying good practice alone is not sufficient to demonstrate that risks have been reduced to ALARP. In addition, if there is no directly applicable rule or standard, operators still have a duty to manage risk, and they therefore must maintain a reasonable level of risk awareness that goes beyond mere compliance.179 This raises a safety case regime above the compliance mentality of a more activity-based regime, such as PSM, and requires the duty-holder and the regulator to continuously ask whether there are other measures that would be effective in further reducing risks. The UK HSE provides ample guidance on determining what is considered to be ALARP, and many British courts have interpreted the concept as well. In the 1949 case Edwards v. National Coal Board, decided by the Court of Appeal, Judge Asquith wrote: ‘Reasonably practicable’ is a narrower term than ‘physically possible’ and seems to me to imply that a computation must be made by the owner, in which the quantum of risk is placed on one scale and the sacrifice involved in the measures necessary for averting the risk (whether in money, time or trouble) is placed in the other; and that if it be shown that there is a gross disproportion between them – the risk being insignificant in relation to the sacrifice – the defendants discharge the onus on them.180 While some critics in the US have argued that the determination of ALARP is strictly a quantitative risk assessment (QRA) calculation that is not sufficiently protective, the CSB has found that the evaluation of ALARP has evolved, as the HSE now allows reliance upon qualitative assessments, QRA, and semi-

175 See http://www.hse.gov.uk/foi/internalops/hid_circs/permissioning/spc_perm_37/ (accessed December 9, 2013). 176 HSE. Assessing compliance with the law in individual cases and the use of good practice; May 2003. http://www.hse.gov.uk/risk/theory/alarp2.htm (accessed June 12, 2013). 177HSE. Guidance on ALARP Decisions in COMAH. http://www.hse.gov.uk/foi/internalops/hid_circs/permissioning/spc_perm_37/ (accessed November 26, 2013). 178 Hopkins, Andrew. The Meaning of “Safety Case”; February 2013; p 6. 179 Hopkins, Andrew. The Meaning of “Safety Case”; February 2013; p 6. 180 Edwards, [1949] 1 K.B. at 704.

Chevron Richmond Refinery Regulatory Report December 2013

41 DRAFT FOR PUBLIC COMMENT quantitative risk assessments to determine ALARP.181 According to the HSE, essential considerations for determining whether a duty holder has reduced risks to ALARP include “the adoption of inherently safer designs…”182 and “[i]dentification of possible further measures that could be applied to lower the risk.”183 The HSE also notes that the guidance to COMAH Regulation 4 (General Duty) “describes the application of all measures necessary to reduce risk of a major accident to ALARP based on a hierarchical approach (inherent safety, prevention, control, mitigation).”184 In Norway, PSA requires companies to “select technical, operational and organisational solutions that reduce the probability that harm, errors and hazard and accident situations occur.”185 PSA regulations require companies to choose the solutions that offer the best results, provided the costs are not significantly disproportionate to the risk reduction achieved.186 In Australia, the NOPSEMA enforces the Offshore Petroleum and Greenhouse Gas Storage Act 2006 and its regulations, which imposes a duty of care on the operator of a facility to “take all reasonably practicable steps” to ensure the facility is safe and all work and other activities are “carried out in a manner that is safe and without risk to the health of any person at or near the facility.”187 NOPSEMA explains that to achieve ALARP, the company “has to show, through reasoned and supported arguments, that there are no other practical measures that could reasonably be taken to reduce risks further.”188 In the US, the NRC has “gradually revised its original scheme, giving an increasing importance to the ‘economic and social factors’, in particular the involvement of all ‘stakeholders’ (authorities, management, staff, public) in the ALARA process.”189 For the regulator, the focus for whether ALARA

181 Center for Chemical Process Safety (CCPS) guidance on risk assessment implies that as the predicted consequence of potential hazard scenarios increases, the level of analytical detail should also increase. Risk assessment approaches range in order of increasing analytical detail from qualitative, to semi-quantitative, to quantitative. Qualitative risk assessment is the simplest approach where judgments about consequence, likelihood, and the tolerability of risk are made on a subjective basis using the knowledge and experience of team members and may not be consistently applied within an organization. Semi-quantitative risk assessment is the second level of analytical detail, where organizations develop and provide to team members predetermined risk matrices and guidance for establishing numerical consequence and frequency levels. This approach is of greater value to team members as based upon their collective experience; the team typically has a sense of how frequently an event might occur and how great the potential consequence may be within the predetermined ranges. Layer of protection analysis (LOPA) is a semi-quantitative form of risk assessment, using order of magnitude categories for evaluating frequency, consequence, and adequacy of safeguards. Quantitative risk assessment involves the highest level of analytical detail and typically involves specialized expertise to perform. Complex models are commonly developed to evaluate frequency, consequence, and the effectiveness of safeguards in a quantitative risk assessment. Such approaches are typically standardized to minimize result variability within an organization and even between organizations in countries where a quantitative risk assessment is mandated by regulatory authorities. Center for Chemical Process Safety (CCPS). Guidelines for Developing Quantitative Safety Risk Criteria; August 2009. 182 HSE. The Safety Report Assessment Manual, Sections 8 to 15. p 30. http://www.hse.gov.uk/comah/sram/s8- 15.pdf (accessed October 30, 2013). 183 Ibid at 8. 184 Ibid at 8. 185 Regulations Relating to Health, Safety and the Environment in the Petroleum Activities and at Certain Onshore Facilities (The Framework Regulations). Section 11, Risk Reduction Principles. http://www.ptil.no/framework- hse/category403.html (accessed November 26, 2013). 186 Ibid. 187 Offshore Petroleum and Greenhouse Storage Act 2006, Volume 3, Schedule 3, Clause 9. http://www.comlaw.gov.au/Details/C2012C00148/Html/Volume_3#_Toc315688204 (accessed October 30, 2013). 188 ALARP Guidance Note N-04-300-GN0166, Rev. 3 (Dec. 2011) available at http://www.nopsema.gov.au/assets/document/N-04300-GN0166-ALARP.pdf (accessed May 15, 2013). 189 Fasso, Alberto, and Rokni, S. Operational Radiation Protection in High Energy Physics Accelerators. Implementation of ALARA in Design and Operation of Accelerators. May 2009; p 6.

Chevron Richmond Refinery Regulatory Report December 2013

42 DRAFT FOR PUBLIC COMMENT has been achieved is on “processes, procedures, and judgments.”190 The duty holder must ensure that choices made to achieve ALARA are “fully documented together with the criteria which have brought to those choices. When the criteria are qualitative, it is more likely that subjective judgments play a large role, but those judgments must be equally recorded.”191 There is no corresponding duty to reduce risks to ALARP in the PSM standard or RMP program. Rather, these regulations require that facilities “control” identified hazards, with no further dialogue on how far the operator must go to control those hazards. Neither the facility nor the regulator is required to determine whether more could be done to control hazards or reduce risks to comply with these regulations, and this may result in the implementation of insufficient controls relating to a hazard. While OSHA and the EPA do rely on general duty standards when implementing the PSM standard and the RMP program, these duties do not drive onshore companies toward reducing the risks of their activities to ALARP, and instead are utilized as enforcement tools typically after an incident has occurred, meant to cover those activities not specifically regulated. These standards may also be used by OSHA or EPA to cite a company for not following a specific RAGAGEP for 2 of the 14 process safety elements - mechanical integrity and PSI. OSHA enforces section 5(a) of the Occupational Safety and Health Act (OSHAct), which states the following:

(a) Each employer – (1) shall furnish to each of his employees employment and a place of employment which are free from recognized hazards that are causing or are likely to cause death or serious physical harm to his employees; (2) shall comply with occupational safety and health standards promulgated under this act…192 Section 5(a)(1), also known as OSHA’s General Duty Clause, has been described as a “catch-all” provision meant to fill gaps in OSHA law for recognized unregulated hazards.193,194 In order for OSHA to issue a General Duty Clause violation, the hazard must be recognized, the employer must have failed to keep the workplace free of the hazard to which his or her employees were exposed, a practical method must be available to correct the hazard, and the hazard must be causing or likely to cause death or serious injury.195 This duty would thus only apply if the absence or failure of one control in a series of controls makes an accident likely to occur (emphasis added).

190 Ibid at 6. 191 Ibid at 6 and 7. 192 29 U.S.C. §654(a)(1) and (2) (2004). 193 Morrison, Kyle W. The General Duty Clause: What is it, how does OSHA use it and what should employers know? Safety + Health [Online]; May 1, 2011. http://www.nsc.org/safetyhealth/Pages/5%2011%20The%20General%20Duty%20Clause.aspx (accessed June 5, 2013). 194 According to the National Safety Council, General Duty Clause violations make up only about 1.5 percent of total violations issued annually by OSHA. Available at http://www.nsc.org/safetyhealth/Pages/5%2011%20The%20General%20Duty%20Clause.aspx (accessed June 5, 2013). 195 Ibid.

Chevron Richmond Refinery Regulatory Report December 2013

43 DRAFT FOR PUBLIC COMMENT On the other hand, in a safety case regulatory regime, the regulator proactively reviews identified hazards and risk reduction strategies proposed by the operator to ensure that risks are being reduced to ALARP. The regulator may require the installation of an absent control if such a control is considered good industry practice, or if it goes further in reducing risks to ALARP. This is a key feature of the safety case approach in preventing major accidents. Under the CAA, the General Duty Clause requires owners and operators “to identify hazards which may result from such releases using appropriate hazard assessment techniques, to design and maintain a safe facility taking such steps as are necessary to prevent releases, and to minimize the consequences of accidental releases which do occur.”196 Similar to OSHA, the EPA can use its General Duty Clause enforcement authority to create legally binding requirements or enforce actions for hazards that have not been specifically regulated. The EPA can use this authority proactively (before an incident) or reactively (following an incident), and can enforce the clause where it finds the possibility of imminent and substantial endangerment.197 According to EPA guidance on the RMP program, because it is the owner or operator’s duty to “prevent accidents and ensure safety at [their] source…” this may require steps to be taken “beyond those specified in the risk management program rule.”198 While this principle appears to be similar to ALARP requirements of the safety case, in practice whether this is done is not subject to regulation or review. In addition, it is permissive in that it uses the word “may.” Nothing additional, such as ALARP, is required. This will be addressed below in more detail in the discussion of implementation of the EPA RMP program in California. 4.3 Adaptability and Continuous Improvement A key strength of the safety case regulatory regime is that it provides the regulator with the tools to drive continuous improvement among facilities and ensure risks have been reduced to ALARP or equivalent, rather than focusing on compliance with activity-based regulatory requirements. Although complying with good practice may achieve ALARP, the regulator also has the ability under this regime to require facilities to go above and beyond good practices and standards to achieve ALARP without requiring rulemaking. The Baker Panel199 noted in its 2007 report (the Baker Report) on BP and its process safety performance following the 2005 BP Texas City disaster that an effective process safety management system builds upon an “improvement cycle” that “should include, in practice, continuous reduction of process risk and improvements in safety performance according to some measurable criteria.”200

196 42 U.S.C. §7412(r)(1) (1990). 197 42 U.S.C. §7412(r)(9) (1990). 198 EPA Office of Solid Waste and Emergency Response. General Guidance on Risk Management Programs for Chemical Accident Prevention (40 CFR Part 68); March 2009; p 7-7. http://www.epa.gov/osweroe1/docs/chem/Toc_final.pdf (accessed May 14, 2013). 199 In the aftermath of the BP Texas City Incident, BP followed the recommendation of the CSB and formed an independent panel known as the Baker Panel to conduct a thorough review of the company’s corporate safety culture, safety management systems, and corporate safety oversight at its US refineries. For a copy of their findings and recommendations see http://www.bp.com/liveassets/bp_internet/globalbp/globalbp_uk_english/SP/STAGING/local_assets/assets/pdfs/Bak er_panel_report.pdf (accessed August 13, 2013). 200 Baker, J. The Report of the BP U.S. Refineries Independent Safety Review Panel, 2007; p 166.

Chevron Richmond Refinery Regulatory Report December 2013

44 DRAFT FOR PUBLIC COMMENT The Baker Panel defined “continuous improvement” as  improving controls for process hazards, including process safety knowledge and competence of workers;   improving process safety leadership of supervisors;   improving process engineering to identify and then design to remove or mitigate the effects of process hazards;   going beyond legal compliance to best practices to reduce risks;   going beyond mere compliance with internal standards, but learning from operating experiences, incident and near miss investigations, hazard studies, audits, and other assessments to improve those internal standards; and   identifying and implementing not only those external standards that must be observed, but also those that represent best practices that can lead to process safety excellence.201  An independent review conducted of the Australian offshore safety case regime in 2000 echoes the importance of continuous improvement in process safety management, stating that “critical to the successful implementation of a safety case regime is the achievement of a qualitative shift in industry and regulatory safety cultures from the minimalist compliance of the prescriptive regime to the philosophy of best practice and continuous improvement.”202 Recently, Lord Cullen addressed the importance of adaptability as well, when he spoke at the 2013 Oil & Gas UK Piper 25 offshore safety conference in Aberdeen, Scotland.203 In his keynote speech, Lord Cullen quoted the Maitland panel, which examined the UK offshore safety regime after the Macondo incident, noting that “safety cases should be living documents [emphasis added] central to the way facilities are operated, with contents widely understood.”204 As changes to regulatory requirements necessitate an extensive, lengthy rulemaking process in the US,205 process safety-related regulations can remain static for decades, while industry standards (many of which are voluntary under the current US system), technologies, and improved procedures and practices continue to change and advance, and new chemicals come into production. In light of major accidents that have occurred, such as the BP Texas City explosion and fire which resulted in 15 fatalities, and the

201 Baker, J. The Report of the BP U.S. Refineries Independent Safety Review Panel, 2007; p 166. 202 Department of Industry, Science and Resources; Offshore Safety and Security, Petroleum and Electricity Division. Australian Offshore Petroleum Safety Case Review: Report of the Independent Review Team. 2000; p 33. 203 In June 2013, Oil & Gas UK held a large offshore safety conference in Aberdeen, which marked the 25th anniversary of the Piper Alpha disaster. For more information see http://www.oilandgasuk.co.uk/events/Piper25.cfm?frmAlias=/Piper25/ (accessed September 16, 2013). 204 Finding Petroleum. Review: Lord Cullen – what have we learned from Piper Alpha? September 16, 2013. http://www.findingpetroleum.com/n/Review_Lord_Cullen_what_have_we_learned_from_Piper_Alpha/044b5113.as px (accessed September 16, 2013). 205 5 U.S.C. Chapter 5, sections 511-599, also known as the Administrative Procedure Act, or APA, requires that federal agencies seeking to promulgate a rule or regulation submit to a lengthy notice and comment rulemaking process that includes publishing the proposed rule making in the Federal Register; providing the public with at least 30 days to participate in the rulemaking process by submitting written comments or data, and then discussing the public comments and providing a rationale for accepting or rejecting them. The OSHAct Section 6(b) specifies the procedures OSHA must use to promulgate, modify, or revoke its standards (29 U.S.C. §655(b)). These procedures include publishing the proposed rule in the Federal Register, providing interested persons an opportunity comment, and holding a public hearing upon request.

Chevron Richmond Refinery Regulatory Report December 2013

45 DRAFT FOR PUBLIC COMMENT Motiva Enterprises sulfuric acid tank explosion, which fatally injured one worker and injured eight others, the CSB has made a number of key recommendations to OSHA and the EPA to revise the PSM and RMP regulations, respectively. However, agencies have failed to implement these recommendations and these regulations have remained static despite the important lessons learned from these incidents. In addition, the OSHA PSM standard’s Appendix A, which contains a list of toxic and reactive highly hazardous chemicals and the threshold quantity for each, was originally created using a number of older sources, including the EPA’s “Extremely Hazardous Substance List,” the 1982 Seveso Directive, the 1984 CIMAH regulations, and others. A number of these sources have been revised, updated, and amended throughout the years, while Appendix A has not. In fact, no chemicals have been added to either the PSM or the RMP programs since the rules were initially adopted in the 1990s, even as numerous serious process incidents occurred involving chemicals that were not listed. The U.S. Government Accountability Office (GAO) published a 2012 report on OSHA’s standard setting abilities, which noted that between 1981 and 2010, OSHA took anywhere from 15 months to 19 years to develop and issue 58 significant safety and health standards (averaging seven years).206 According to the report, OSHA reasoned that it must evaluate technological and economic feasibility of a potential standard using data gathered by visiting worksites in industries that will be affected, on an industry-by- industry basis.207 This was described as “an enormous undertaking because, for example, it requires visits to multiple worksites.”208 In addition, Executive Order 12866209 requires that federal agencies, including OSHA, provide an assessment of the potential overall costs and benefits for significant rules to the Office of Management and Budget (OMB). OSHA will typically be required under the Small Business Regulatory Enforcement Fairness Act of 1996210 to initiate a panel process to receive and consider input from representatives of affected small businesses, which could take eight months or more.211 Only OSHA, the EPA, and the Consumer Financial Protection Bureau are subject to this requirement.212 Finally, the OSHAct directs courts to review OSHA’s standards using a more stringent legal standard than the Administrative Procedure Act’s (APA) “arbitrary and capricious” test213 when reviewing

206 GAO. Workplace Safety and Health: Multiple Challenges Lengthen OSHA’s Standard Setting; April 19, 2012; p

  1. Available at http://gao.gov/assets/600/590210.pdf (accessed June 12, 2013).

207 Ibid at 6. The Supreme Court has held that the OSHAct requires that standards be both technologically and economically feasible. Am. Textile Mfrs. Inst. V. Donovan, 452 U.S. 490, 513 n. 31 (1981). Also see United Steelworkers v. Marshall, 647 F. 2d 1189, 1301 (D.C. Cir. 1980), quoted in AFL-CIO v. OSHA, 955 F. 2d 962, 980 (11th Cir. 1992). Assessing feasibility on an industry-by-industry basis requires that the agency research all applications of the hazard being regulated, as well as the expected cost for mitigating exposure to that hazard, in every industry. 208 Ibid at 6. 209 Exec. Order No. 12866, 48 Fed. Reg. 190 (September 30, 1993). http://www.whitehouse.gov/sites/default/files/omb/inforeg/eo12866/eo12866_10041993.pdf (accessed June 12, 2013). 210 5 U.S.C. §609(b), (d) (1996). 211 GAO. Workplace Safety and Health: Multiple Challenges Lengthen OSHA’s Standard Setting; April 19, 2012; p

  1. Available at http://gao.gov/assets/600/590210.pdf (accessed June 12, 2013).

212 5 U.S.C. §609(d) (1996). 213 Pursuant to the APA, agency decisions may be set aside only if “arbitrary, capricious, an abuse of discretion, or otherwise not in accordance with law.” 5 U.S.C. §706(2)(A). There is abundant case law that discusses this standard. Courts have held that a court “may reverse under the arbitrary and capricious standard only if the agency has relied on factors that Congress has not intended it to consider, entirely failed to consider an important aspect of the problem, offered an explanation for its decision that runs counter to the evidence before the agency, or is so implausible that it could not be ascribed to a difference in view or the product of agency expertise. See Greater Yellowstone Coalition v. Lewis, 638 F. 3d 1143, 1148 (9th Cir. 2010) (as amended) (relaying on The Lands Council

Chevron Richmond Refinery Regulatory Report December 2013

46 DRAFT FOR PUBLIC COMMENT OSHA’s standards;214 an OSHA standard may only be upheld if it is supported by “substantial evidence in the record considered as a whole.”215 According to the GAO report, OSHA officials claim this more stringent standard (known as the “substantial evidence” standard) requires a higher level of scrutiny by the courts and as a result, OSHA staff must conduct a large volume of detailed research in order to understand all industrial processes involved in the hazard being regulated, and to ensure that a given hazard control would be feasible for each process.216 The GAO also found that although OSHA has the ability to address urgent hazards by issuing emergency temporary standards, the agency has not used this authority since 1983 because of the difficult hurdles the agency faces in presenting the evidence necessary to meet the statutory requirements.217 In summary, all of these extensive rulemaking constraints have resulted in OSHA’s failure to undertake many standard revisions or improvements. In Spring 2013, OSHA announced its new regulatory agenda, which stated that one of the things OSHA plans to consider is revising the PSM standard to “address gaps in safety coverage.”218 Potential revisions include “expanding coverage and requirements for reactivity hazards,” which the CSB addressed in its 2002 report entitled “Improving Reactive Hazard Management,”219 and “expanding the scope of paragraph (j) to cover the mechanical integrity of any safety-critical equipment…”220 However, OSHA has proposed changes to the PSM standard before, with no action ultimately being taken. On April 27, 1998, OSHA announced that it was considering issuing an Advance Notice of Proposed Rulemaking221 (ANPRM) “to address issues related to reactive chemicals raised by the explosion of a chemical plant in

v. McNair, 537 F.3d 981, 987 (9th Cir. 2008) (en banc), overruled on other grounds by Winter v. Natural Res. Def. Council, 555 U.S. 7 (2008)). 214 GAO. Workplace Safety and Health: Multiple Challenges Lengthen OSHA’s Standard Setting; April 19, 2012; p

  1. http://gao.gov/assets/600/590210.pdf (accessed June 12, 2013).

215 29 U.S.C. §655(f). 216 GAO. Workplace Safety and Health: Multiple Challenges Lengthen OSHA’s Standard Setting; April 19, 2012; p

  1. http://gao.gov/assets/600/590210.pdf (accessed June 12, 2013).

217 OSHA must demonstrate that workers are exposed to grave danger and establish that an emergency temporary standard is necessary to protect workers from that grave danger. OSHA is also required to replace an emergency temporary standard with a permanent standard within six months using the requirements laid out in OSHAct 6(b). Ibid at 11. 218 See OSHA’s rulemaking abstract at http://www.reginfo.gov/public/do/eAgendaViewRule?pubId=201304&RIN=1218-AC82 (accessed September 17, 2013). 219 In this report, the CSB recommended to OSHA that it amend the PSM standard “to achieve more comprehensive control of reactive hazards that could have catastrophic consequences.” The report is available at http://www.csb.gov/assets/1/19/ReactiveHazardInvestigationReport.pdf (accessed September 17, 2013). The recommendations start on page 89 of the report. 220 See OSHA’s rulemaking abstract at http://www.reginfo.gov/public/do/eAgendaViewRule?pubId=201304&RIN=1218-AC82 (accessed September 17, 2013). 221 Most federal agencies develop rules through “informal rulemaking.” Under the Administrative Procedure Act, or APA, informal rulemaking requires a publication of a “Notice of Proposed Rulemaking” (NPRM) in the Federal Register; opportunity for public participation by submission of written comments; consideration by the agency of the public comments and other relevant material; and publication of a final rule not less than 30 days before its effective date, with a statement explaining the purpose of the rule. Under the APA, an agency may publish an Advance Notice of Proposed Rulemaking (ANPRM) when the agency wants to test out a proposal or solicit ideas before it drafts its NPRM. For more information see http://www.foreffectivegov.org/node/226 (accessed September 17, 2013).

Chevron Richmond Refinery Regulatory Report December 2013

47 DRAFT FOR PUBLIC COMMENT Lodi, New Jersey in 1995.”222,223 On May 14, 2001, OSHA clarified its intent to publish an ANPRM “to address the need to add reactive chemicals that are not currently covered by PSM…”224 On December 3, 2001, however, the entry on reactives was withdrawn from the rulemaking agenda.225 Following the devastating ammonium nitrate explosion on April 17, 2013, in West, Texas, which resulted in at least 14 fatalities and mass destruction in the town of West, CSB Chairperson Moure-Eraso urged both OSHA and the EPA to expand their standards to include reactive chemicals and hazards such as ammonium nitrate.226 On July 25, 2013, the CSB held a public meeting in Washington, DC to discuss the status of key open recommendations the CSB has made to OSHA over the last decade to revise its PSM standard and create a new combustible dust standard. These recommendations, which include revising the PSM standard to require MOC reviews for organizational changes such as mergers and acquisitions that may impact process safety, and ensuring PSM coverage for atmospheric storage tanks that could be involved in a potential catastrophic release, have stemmed from major CSB investigations including its BP Texas City, Motiva, ConAgra, Kleen, Imperial Sugar, and Hoeganaes investigations, as well as its Combustible Dust Study.227 OSHA’s failure to implement these recommendations, which can be attributed to its lack of rulemaking activities over the last decade, led the CSB to reclassify seven key open recommendations as “Open-Unacceptable.” The CSB also adopted the OSHA Combustible Dust Standard recommendation as a CSB “Most Wanted Chemical Safety Improvement.” OSHA formally responded and cited to the GAO report discussed above, noting that on average, it takes OSHA seven years to issue a standard, a process that is only getting longer. Hence, OSHA reserves rulemaking for “widespread and serious hazards.” Needed petroleum refinery and chemical process safety improvements may never fall under this category. OSHA noted at the meeting that it will be utilizing a Request for Information228 (RFI) to aid in the revision of its PSM standard, which will contain questions aimed at addressing a number of issues that have developed in the 21 years since the PSM standard was promulgated in 1992. This is an important opportunity to enhance the dialogue on implementation of the safety case regulatory approach to enhance process safety management and risk reduction in the US. OSHA’s ability to adapt to process safety-related new or revised codes, standards, technology, and lessons learned is mainly limited to RAGAGEP requirements, which OSHA included in the mechanical

222 See https://www.osha.gov/pls/oshaweb/owadisp.show_document?p_table=FEDERAL_REGISTER&p_id=13792 (accessed September 17, 2013). 223 This incident took place on Friday, April 21, 1995, at a chemical facility occupied by Napp Technologies. The explosion and fire resulted in five fatalities. 224 See https://www.osha.gov/pls/oshaweb/owadisp.show_document?p_table=FEDERAL_REGISTER&p_id=16776 (accessed September 17, 2013). 225 See https://www.osha.gov/pls/oshaweb/owadisp.show_document?p_table=FEDERAL_REGISTER&p_id=16946 (accessed September 17, 2013). 226 In a 2002 study entitled Improving Reactive Hazard Management, the CSB made recommendations to OSHA and the EPA to expand their regulations to include reactive chemicals and hazards. To date, neither agency has acted on the recommendations. See http://www.csb.gov/in-safety-message-csb-chairperson-rafael-moure-eraso- calls-for-regulatory-coverage-of-reactive-chemicals-following-the-west-fertilizer-explosion-and-fire-/ (accessed September 23, 2013). 227 For more information on this meeting, see http://www.csb.gov/events/csb-public-meeting-to-vote-on-key-safety- recommendations-and-initiate-most-wanted-program/ (accessed July 29, 2013). 228 An RFI is a tool used by a federal agency to help it develop a proposed rule. Federal agencies generally use RFIs when they want public input on whether a new rule or changes to an existing rule are needed, and comments on what course the agency should take should it decide to move forward. More information available at http://www.dol.gov/regulations/participate.htm (accessed July 29, 2013).

Chevron Richmond Refinery Regulatory Report December 2013

48 DRAFT FOR PUBLIC COMMENT integrity and PSI elements of its PSM standard in part to “provide flexibility for the employer to choose the frequency which would provide the best assurance of equipment integrity.”229 OSHA meant for RAGAGEP to include “both appropriate internal standards and applicable codes and standards…”230 However, the concept of RAGAGEP only applies to 2 of the 14 PSM standard elements (mechanical integrity and PSI), only addresses equipment and mechanical integrity, and is usually utilized by OSHA as a mechanism to issue citations to companies post-incident. In addition, OSHA has had difficulty enforcing RAGAGEP citations. In a recent OSHA Review Commission proceeding, Secretary of Labor v BP Products North America, Inc., & BP-Husky Refining, LLC,231 and United Steelworkers Local 1-346, the Administrative Law Judge (ALJ) vacated OSHA RAGAGEP citations issued to BP for violations of 29 CFR §1910.119(d)(3)(ii)232 for failure to comply with a specific RAGAGEP, holding that OSHA impermissibly adopted a specific RAGAGEP, thereby diminishing the performance aspect of the RAGAGEP requirements contained within the OSHA PSM standard. The ALJ concluded that by citing to only one specific RAGAGEP, OSHA impermissibly adopted a prescriptive standard; in the ALJ’s view, OSHA should have acknowledged other possible RAGAGEPs for BP to comply with, including BP’s own internal standards. If upheld, this ruling may limit OSHA’s ability to utilize RAGAGEP as a means of requiring companies to implement industry good practices in the future.233 The cumbersome rulemaking process and lack of flexibility that has resulted in stagnant and static OSHA standards can be contrasted with the structure of the safety case regulatory regime, which facilitates adaptability and enables the regulator to improve industry safety performance and practices without requiring a major rule change. The safety case essentially provides the regulator with the tools to recognize more rigorous standards and practices that exist and drive a company to implement those practices to further reduce risks, as well as work with industry to improve existing standards and practices if necessary. It also enables companies to implement new, more efficient or safer technologies that do not necessarily meet strict prescriptive regulations, but that drive risk reduction. This adaptability is illustrated by the HSE’s recommendations following the 2004 Buncefield incident. On December 11, 2004, a number of explosions occurred at Buncefield Oil Storage Depot in Hemel Hemptstead, Hertfordshire, England following the overfilling of a gasoline tank. Over 40 people were injured and there was significant offsite damage to homes and businesses. An independently chaired Major Incident Investigation Board led by Lord Newton of Braintree was set up to investigate the incident. Between 2006 and 2008 the Board issued a number of reports and recommendations. In the report issued in March 2007 entitled “Recommendations on the design and operation of fuel storage sites,” the Board highlighted the adaptability of the existing regulatory regime by noting that the recommendations to improve standards and revise guidance should not require actual changes to the law, because the existing legal framework was “sufficient to ensure that necessary improvements are put in

229 57 Fed. Reg. 6390-6391 (1992). 230 Ibid at 6390-6391. 231 BP Products North America, Inc. operates a refinery in Oregon, Ohio. BP-Husky is a joint venture with a business interest in the refinery. 232 29 CFR 1910.119(d)(3)(ii) requires the employer to document that equipment complies with RAGAGEP. 233The Occupational Safety and Health Review Commission is scheduled to review the decision.

Chevron Richmond Refinery Regulatory Report December 2013

49 DRAFT FOR PUBLIC COMMENT place.”234 The Board followed by making its first recommendation of the report, to the COMAH CA and operators of Buncefield-type sites to develop and agree on a methodology to determine safety integrity level (SIL) requirements for overfill prevention systems, which takes account of, among other things, nearby resources or populations.235 The Board also recommended that the sector “develop guidance to incorporate the latest knowledge on preventing loss of primary containment and on inhibiting escalation if loss occurs.”236 Another key recommendation was made to the CA to “ensure that safety reports submitted under the COMAH Regulations contain information to demonstrate that good practice in human and organisational design, operation, maintenance and testing is implemented as rigorously as for control and environmental protection engineering systems.”237 Finally, the Board recommended in this report that the “sector agree with the Competent Authority on a system of leading238 and lagging239 performance indicators for process safety performance…” based on HSE’s guidance on Developing process safety indicators.240 Spurred by recommendations made surrounding the Buncefield incident, the BP Texas City incident, and the BP Grangemouth incident,241 the COMAH CA developed an Operational Delivery Guide entitled “COMAH Competent Authority Workstream 2e: Process safety performance indicators,”242 which was “designed to continue the promotion and development of site level process safety performance indicators (PSPIs) as part of the monitoring arrangements for an effective process safety management system at major hazard sites.”243 The guide states that by the end of March 2013 all “Buncefield-type” sites would “have effective monitoring of process safety performance in place and that site specific leading and lagging performance indicators have been developed…”244 and that by the end of 2015 “all major hazard establishments and duty holders will measure their performance on the control of major hazard risks by way of key leading and lagging performance indicators.”245 It lays out in detail a six-step process for implementing a process safety measurement system; how inspectors will assess a duty holder’s performance; and adds that full implementation of this program could take between 18 months and two and a half years from when the initial introduction takes place – all without requiring any fundamental changes to the COMAH regulations themselves.

234 Buncefield Major Incident Investigation Board. Recommendations on the design and operation of fuel storage sites; March 2007; p 3. http://www.buncefieldinvestigation.gov.uk/reports/recommendations.pdf (accessed May 21, 2013). 235 Ibid at 8. 236 Ibid at 15. 237 Ibid at 19. 238 Leading indicators are measurements that predict future performance to ensure that safety protection layers and operating discipline are being maintained, including unsafe behaviors or insufficient operating discipline equipment selection, engineering design, specification of inspection frequency, and technique. See Center for Chemical Process Safety (CCPS), Guidelines for Process Safety Metrics; October 2009; p 20. 239 Lagging indicators are facts about previous events, such as process safety incidents, that meet the threshold of severity and should be reported as part of the process safety metric. Ibid at 20. 240 Ibid at 13. 241 Between May 29 and June 10, 2000, three incidents occurred at the BP Grangemouth Petrochemical Complex in Scotland, which is one of the largest of the 950 COMAH sites in the UK. 242 Available at http://www.hse.gov.uk/comah/guidance/process-safety-performance-indicators.pdf (accessed May 21, 2013). 243 COMAH Competent Authority, “Workstream 2e: Process safety performance indicators,” 2012; page 3. 244 COMAH Competent Authority, “Workstream 2e: Process safety performance indicators,” 2012; page 6. 245 Ibid at 3.

Chevron Richmond Refinery Regulatory Report December 2013

50 DRAFT FOR PUBLIC COMMENT The COMAH CA Investigation Team noted in its publication summarizing the conclusions of the Buncefield investigation that following the incident, the CA, industry and trade unions worked together to “drive forward high standards at fuel storage sites…[which] has resulted in agreement on improved standards of safety and environmental protection for all UK sites storing large volumes of gasoline and to systematically upgrade sites to meet these standards…”246 In another example following the Buncefield incident, the Board recommended significantly higher standards than were generally in place in the sector. For example, the Board recommended that fuel storage tanks be fitted with automatic overfill protection equipment that would cut off supply if an overfill event occurs, rather than continuing to rely on operators to interrupt flow manually in the case of an event. In response, the UK Petroleum Industry Association and the Tank Storage Association adopted the recommendation, and the British government announced that it would require all sites to move to fully automatic shutdown systems on tanks storing gasoline. The Process Safety Leadership Group (PSLG) was formed to help develop the details of the new rule, and to “meet the need for an effective framework for interaction between industry, trade unions and the COMAH Competent Authority (CA)…”247 As will be discussed in the next section, workforce involvement is a key element of an effective safety case regulatory regime. In 2009, HSE published the PSLG’s work in a document entitled Safety and Environmental Standards for Fuel Storage Sites. The document lays out precisely which tanks must utilize automatic overfill protection equipment, and also allows for duty holders to demonstrate technical reasons as to why automatic overfill protection would not be appropriate by “prepar[ing] a robust demonstration that alternative measures are capable of achieving an equivalent ALARP outcome to an overfill protection system that is automatic…”248 This document in essence was developed as an industry good practice, and compliance with its requirements would likely ensure that the duty holder is complying with the law and reducing risks to ALARP.249 This can be contrasted with an even larger release of gasoline and a subsequent explosion that occurred in the 2009 tank overfill at the Caribbean Petroleum Corporation near San Juan, Puerto Rico. This incident severely damaged surrounding buildings and impacted moving vehicles. This incident has not resulted in any re-evaluation of safety rules by the EPA or OSHA, despite the fact that tank terminals largely fall outside the PSM and RMP program regulations, (let alone the more rigorous requirements of a major hazard safety case regulatory regime, as practiced in the UK). These post-Buncefield examples highlight one of the most important attributes of the safety case regulatory approach: it is a regulatory framework that implements a balance of goal-setting and prescriptive elements which enable the regulator to drive facilities to continuously improve practices aimed at reducing risks to ALARP, without having to adhere to the extensive and time-consuming rulemaking requirements that exist in the US. This flexibility and adaptability encourages facilities to focus on improving practices and technology rather than on completing activity-based requirements, which can have the effect of stifling innovation and technological advancement.

246 The Competent Authority. Buncefield: Why did it happen? The underlying causes of the explosion and fire at the Buncefield oil storage depot, Hemel Hempstead, Hertfordshire on 11 December 2005; February 2011; p 3. http://www.hse.gov.uk/comah/buncefield/buncefield-report.pdf (accessed May 21, 2013). 247 Process Safety Leadership Group. Safety and environmental standards for fuel storage sites; London, 2009; p 7. http://www.hse.gov.uk/comah/buncefield/fuel-storage-sites.pdf (accessed August 1, 2013). 248 Ibid at 29. 249 For a detailed discussion of rule-compliance and the safety case, see Hopkins, Andrew. Risk-management and rule-compliance: Decision-making in hazardous industries; Safety Science 49 (1011) 110-120.

Chevron Richmond Refinery Regulatory Report December 2013

51 DRAFT FOR PUBLIC COMMENT Critics argue that because there have been significant industry problems with the maintenance of safety critical equipment and aging equipment in the UK, 250 the safety case regime is not operating effectively. Regulators and commissions in the UK have found degradation of pipes, valves, and other equipment at many facilities due to company deferral of maintenance, insufficient testing of safety-critical elements, and a continuing industry culture of responding to disasters. However, the HSE has worked to make improvements to these areas. In 2010, the UK HSE initiated Key Programme 4 to address the issue of aging equipment offshore and the operation of installations beyond their design life.251 The same year, the HSE published a report intended to inform industry and aid in the prevention of major accidents entitled Managing Ageing Plant: A Summary Guide,252 which provides an overview of ageing plant mechanisms and their management. This document presents analysis and findings for loss of containment incidents to demonstrate how aging plant equipment may be a factor. The HSE has been able to take this type of programmatic proactive approach in the UK thanks to the safety case regime’s adaptive nature, which is lacking in the US both on and offshore. This is positive evidence of a competent and effective regulator with the capability under the safety case regime to identify and proactively address industry gaps in safety performance. 4.4 Active Workforce Participation As the CSB noted in its Interim Report on the Chevron incident, workforce participation is a key element of process safety and effective major accident prevention. In one of its publications, the Center for Chemical Process Safety (CCPS) lists workforce involvement as one of 20 essential management components necessary to reduce process safety risks and prevent chemical accidents.253 According to CCPS, …workers are potentially the most knowledgeable people with respect to the day-to-day details of operating the process and maintaining the equipment and facilities and may be the sole source for some types of knowledge gained through their unique experiences. Workforce involvement provides management a mechanism for tapping into this valuable expertise.254 This CCPS publication discusses general areas of workforce involvement in risk assessments, inspections, audits, and performance reviews, and notes that participation leads to empowerment, management responsiveness, and process safety performance improvement. 255 The OSHA PSM standard requires employers to consult with employees and their representatives on the conduct and development of PHAs and on the development of the 13 remaining PSM elements, and to develop a written plan of action

250 The HSE published a report to communicate the results and conclusions of the Asset Integrity Key Programme carried out between 2004 and 2007 by the Health and Safety Executive’s Offshore Division. See http://www.hse.gov.uk/offshore/kp3.pdf, (accessed August 28, 2013). 251 The UK launches Key Programmes to address poor performance in specific areas. Access the report entitled Key Programme 4 (KP$): Ageing and life extension at http://www.hse.gov.uk/offshore/ageing/kp4-interim-report.pdf (accessed November 1, 2013). 252 See http://www.hse.gov.uk/research/rrpdf/rr823-summary-guide.pdf (accessed November, 1, 2013). 253 CCPS. Guidelines for Risk Based Process Safety; March 2007; p liv. 254 Ibid at 124. 255 Ibid at 125.

Chevron Richmond Refinery Regulatory Report December 2013

52 DRAFT FOR PUBLIC COMMENT regarding the implementation of the employee participation required under this section.256 During facility inspections, OSHA inspectors must request and evaluate these written plans of action regarding the implementation of employee participation as well as interview employees and their representatives to verify that the employer is satisfying the requirements.257 In previous investigation reports, the CSB has identified that workers and their representatives play a very important role in major incident prevention. For example, as will be discussed in the next section on performance indicators, the CSB recommended in the BP Texas City investigation report that BP and the United Steelworkers Union (USW) establish a joint program to report incidents and near misses, and to ensure that recommendations made during investigations were implemented. The CSB also recommended that API and the USW work together to develop a safety standard addressing leading and lagging process safety indicators.258 However, representatives from the USW have stated to the CSB that it is a constant struggle for workers and their representatives to have a voice or play a role in the management of safety in US petroleum refineries. The law in the UK also requires employers to consult with their employees or their safety representatives on health and safety matters. The Safety Representatives and Safety Committees Regulations 1977 and the Health and Safety (Consultation with Employees) Regulations 1996 set out the legal framework for such consultation and worker involvement at both unionized and non-unionized onshore facilities.259 However, these regulations go further than the OSHA PSM standard in that they provide for the election of safety representatives by the workers to serve many health and safety-related functions, including investigating complaints and accidents and carrying out inspections. In his keynote speech at the Oil and Gas UK Piper 25 conference mentioned in Section 4.3, Lord Cullen stated that the safety representative positions have “important functions, such as the power to carry out investigations and reporting safety concerns to management, without fear of recrimination,” noting that they “help[] reinforce the principle that each employee is responsible for his own safety.”260 The regulations also require employers to establish a safety committee when one is requested by at least two health and safety representatives. The 1996 regulations require employers to consult with employees not represented by safety representatives under the 1977 Regulations on a number of health and safety-related matters, such as the introduction of any measure which may substantially affect their health and safety at work, the planning and organization

256 29 CFR §1910.119(c) (2012). 257 See OSHA CPL 02-02-045. Process Safety Management of Highly Hazardous Chemicals – Compliance Guidelines and Enforcement Procedures. September 13, 1994. https://www.osha.gov/pls/oshaweb/owadisp.show_document?p_id=1558&p_table=directives (accessed September 6, 2013). 258 Process safety indicators are also referred to as safety performance indicators, metrics, key process indicators, performance measures, indicators, etc… 259 The 1977 regulations apply to workplaces where the employer recognizes trade unions and trade unions are recognized for collective bargaining purposes. Regulations available at http://www.legislation.gov.uk/uksi/1977/500/contents/made (accessed September 4, 2013). The 1996 regulations apply to workplaces where employees are not in a trade union and/or the employer does not recognize the trade union, or the trade union does not represent those employees not in the trade union. Regulations available at http://www.legislation.gov.uk/uksi/1996/1513/contents/made (accessed September 4, 2013). 260 Finding Petroleum. Review: Lord Cullen – what have we learned from Piper Alpha? September 16, 2013. http://www.findingpetroleum.com/n/Review_Lord_Cullen_what_have_we_learned_from_Piper_Alpha/044b5113.as px (accessed September 16, 2013).

Chevron Richmond Refinery Regulatory Report December 2013

53 DRAFT FOR PUBLIC COMMENT of health and safety training, and the health and safety consequences of introducing new technology.261 The law in the UK protects employees from being penalized for taking part in health and safety consultation.262 The UK’s existing regulations and policies regarding worker involvement offshore were developed and strengthened as a result of the Piper Alpha incident. In the Piper Alpha Report, Lord Cullen emphasized the importance of workforce involvement in safe operations, and noted that a safety committee system is “the most visible instrument for the involvement of the workforce in safety.”263 He concluded by recommending that “the regulatory body, operators and contractors should support and encourage the involvement of the offshore workforce in safety.”264 HSE developed guidance in response to Lord Cullen’s recommendations entitled Play your part! How offshore workers can help improve health and safety, intended to encourage workforce participation offshore.265 The most current version of this guidance document, which was prepared by the Workforce Involvement Group (WIG),266 located within HSE’s Offshore Industry Advisory Committee (OIAC),267 utilizes good practice and examples of successful workforce involvement in improving health and safety with the goal of assisting operators, contractors, safety representatives, and others in effectively utilizing workforce involvement in their workplaces. It encourages companies to facilitate workforce involvement by providing information, improving communication at all levels, good training, and ensuring that all workers are represented in the decisions that affect them.268 The Piper Alpha incident also resulted in the swift development of the SI971 Offshore Regulations (Safety Representatives and Safety Committees) Regulations 1989 (“the SI971 Regulations”), which provide for the nomination and election of safety representatives and require offshore installations to establish safety committees.269270 The HSE has published a guidance document entitled A guide to the

261 See HSE. Consulting employees on health and safety: A brief guide to the law. 2013. http://www.hse.gov.uk/pubns/indg232.pdf (accessed September 4, 2013). 262 See Employment Rights Act 1996. Section 44. Health and safety cases. http://www.legislation.gov.uk/ukpga/1996/18/section/44 (accessed September 4, 2013). 263 Department of Energy. The Public Inquiry into the Piper Alpha Disaster; Presented to Parliament by the Secretary of State for Energy by Command of her Majesty; November 1990; p 301. 264 Department of Energy. The Public Inquiry into the Piper Alpha Disaster; Presented to Parliament by the Secretary of State for Energy by Command of her Majesty; November 1990; p 392. 265 See HSE. Play your part! How offshore workers can help improve health and safety; 2013. http://www.hse.gov.uk/pubns/indg421.pdf (accessed June 17, 2013). 266 The WIG’s mission is to improve safety “by stimulating lateral learning and best practice across the offshore industry through involvement of the whole workforce.” It looks at ways to increase worker involvement in health and safety matters offshore and is chaired by HSE. For more information see http://www.hse.gov.uk/aboutus/meetings/iacs/oiac/wig.htm (accessed June 17, 2013). 267 The OIAC is a tripartite committee that includes members representing employers, employees, unions, trade associations and other government departments. It is focused solely on the offshore sector. More information is available at http://www.hse.gov.uk/aboutus/meetings/iacs/oiac/information.htm (accessed June 17, 2013). 268 HSE. Play your part! How offshore workers can help improve health and safety; 2013; p 4. http://www.hse.gov.uk/pubns/indg421.pdf (accessed June 17, 2013). 269 Under Regulation 16, safety representatives are responsible for investigating potential hazards and incidents, examining causes of accidents, investigating complaints by any member of his or her constituency relating to occupational health and safety, representing members of the workforce in consultations on the offshore installation with inspectors, and consulting constituency members on any matters arising out of the Regulation. Under Regulation 17, a safety representative may inspect any part of the offshore installation or its equipment either on a regular basis or following an incident. According to HSE, “this can be of great benefit to the duty holder because it brings an independent look at health and safety factors from the workforce viewpoint. Workers are in the front line

Chevron Richmond Refinery Regulatory Report December 2013

54 DRAFT FOR PUBLIC COMMENT Offshore Installations (Safety Representatives and Safety Committees) Regulations 1989271 designed to assist duty holders, employers, installation managers, safety representatives, safety committee members and all members of the workforce in the offshore industry with what the regulations require and what must be done to comply with them. The document explains that although the primary responsibility for health and safety resides with the duty holder, “all members of the workforce must play their part if risks are to be eliminated or minimized.”272 It also emphasizes the importance of training of safety representatives, which enables them to effectively represent workers and fulfill their responsibilities and functions under these Regulations. In April 2010, HSE launched an inspection project to examine the effectiveness of the SI971 Regulations and the effectiveness of those regulations, as well as to collect examples of best practice to present to the offshore industry.273 Forty-one inspections were completed in a six-month period on offshore installations operated by 25 different duty holders. The project helped focus on the power of safety representatives and how to strengthen their ability to effectively perform their duties. It also was well received by the safety representatives, as it gave them encouragement and recognition, and sent a message to management on the importance of SI971 and the key role of safety representatives and committees in workplace health and safety. The HSE has placed great emphasis and importance on the role of worker involvement and consultation in improving workplace health and safety and reducing major accidents on and offshore. In June 2009, HSE launched a new strategy entitled Be part of the solution, which lists workforce involvement as one of its main priorities, and the agency has published a significant amount of guidance on worker involvement and consultation on its website.274 The Norwegian Working Environment Act addresses the rights and duties of safety representatives and committees in Norway. It applies to nearly all workers in Norway, including onshore and offshore oil workers. The Act provides for the election of government recognized safety representatives whose duty is to “safeguard the interests or employees in matters of the working environment.”275 These representatives have the right to information, consultation, and participation in inspections.276 They also have the right to halt unsafe work until the regulator decides when the work may continue.277

and are often well placed to see problems and put forward practical suggestions.” HSE. A guide to the Offshore Installations (Safety Representatives and Safety Committees) Regulations 1989; 2012; p 20. http://www.hse.gov.uk/pubns/priced/l110.pdf (accessed September 4, 2013). 270 Under Regulation 22, safety committees are responsible for reviewing the system of constituencies so as to ensure adequate representation of the workforce on health and safety matters, reviewing training of safety representatives, reviewing the frequency of safety committee meetings and the circumstances under which they may be called, and considering causes of accidents and making recommendations to the installation manager. 271Third edition published in 2012. Available at http://www.hse.gov.uk/pubns/priced/l110.pdf (accessed September 4, 2013). 272 Ibid at 7. 273 See HSE. Offshore workforce involvement and consultation: Compliance Inspection Project. Available at http://www.hse.gov.uk/offshore/si971.pdf (accessed September 4, 2013). 274 See http://www.hse.gov.uk/involvement/hsrepresentatives.htm (accessed September 4, 2013). 275 Act Relating to Working Environment, Working Hours and Employment Protection, Etc. (Working Environment Act). December 2012. Section 6-1. Obligation to elect safety representatives. 276 Ibid at Section 6-2. Duties of safety representatives. 277 Ibid at Section 6-3. The safety representative’s right to halt dangerous work.

Chevron Richmond Refinery Regulatory Report December 2013

55 DRAFT FOR PUBLIC COMMENT A tripartite system consisting of active and equal participation from the regulator, workforce, and industry, is necessary for effective safety case implementation. A fundamental element in effective safety management for major accident prevention is active and equal participation from the regulator, industry, and labor. Each entity provides unique and essential insights, and removing the participation of these entities removes a critical voice in health and safety matters. In the UK and Norway, tripartite systems consisting of industry, the regulator, and the workforce have been established to deal with safety and health issues at the highest levels beyond just site workforce representation. The CSB investigation staff has had extensive discussions with worker representatives who have voiced their opinions on their systems to the CSB. Roy Furre, a Representative from the Norwegian Union of Energy Workers, spoke at the CSB’s 2010 public hearing on the Regulatory Approaches to Offshore Oil and Gas Safety, and stated that the Norwegian working environment and the accompanying petroleum regulations empower unions and safety delegates in all phases of the petroleum activities.278 He also noted that the Norwegian petroleum regulations require that all necessary information about risks and decisions be given to the workers’ representatives.279 During the CSB’s public hearing on Safety Performance Indicators in July 2012, Jake Molloy, the Regional Organizer for the National Union of Rail, Maritime and Transport Workers in the UK, stated that the input of workers is “crucial” in major accident prevention and that “if the people operating these systems and delivering these results are unable for any reason to tell you what the true picture is, everything else is worthless.”280 When speaking at a “Step Change for Safety” Conference in Aberdeen, Scotland, on September 5, 2012, Mr. Molloy noted that attending the public hearing in Houston was “eye opening” and that hearing about the US system was like a “walk back in time.”281 4.5 Process Safety Indicators that Drive Performance As the CSB noted in both its July 2012 public hearing on Safety Performance Indicators and its Chevron Interim Report, leading and lagging process safety indicators help drive continuous process safety improvement, as long as regulators utilize these indicators to focus inspections, audits, and investigations, and organizations focus attention on them in a way that makes a difference. Process safety indicators are a significant element of process safety management systems. They measure the strengths and weaknesses of these systems to achieve and maintain safe and reliable operations282 and, if properly defined, collected and used, can identify the successes and flaws of the system.283 Lagging indicators are a “form of reactive monitoring”284 that includes events such as major spills, fires, or gas releases. Leading indicators, on the other hand, are a “form of active monitoring,”285 and are

278 CSB. Public Hearing: Regulatory Approaches to Offshore Oil and Gas Safety. December 15, 2010; p 300. http://www.csb.gov/assets/1/19/Transcript_of_Public_Meeting_12_15_2010.pdf (accessed December 10, 2013). 279 Ibid at 300. 280 CSB. Public Hearing: Safety Performance Indicators. July 23, 2013; p 143. http://www.csb.gov/assets/1/19/CSB_20Public_20Hearing.pdf (accessed December 10, 2013). 281 http://www.youtube.com/watch?v=-xDzb4x8t_c (accessed December 10, 2013). 282 CCPS. Guidelines for Process Safety Metrics; October 2009; p 109. 283 Ibid. 284 HSE. Developing process safety indicators: A step-by-step guide for chemical and major hazard industries; 2006; p 7. http://www.hse.gov.uk/pubns/books/hsg254.htm (accessed May 28, 2013). 285 Ibid.

Chevron Richmond Refinery Regulatory Report December 2013

56 DRAFT FOR PUBLIC COMMENT described as events that do not result in severe consequences and usually address safety system performance, such as deviations from safe operating limits or timely maintenance on safety critical equipment.286 Leading indicators “can be considered as measures of process or inputs essential to deliver the desired safety outcome.”287 The general thinking globally is that if companies rely primarily on lagging indicator data, which is retrospective, they are not effectively managing process safety to ensure major accidents are prevented. According to HSE, “[t]oo many organizations rely heavily on failure data to monitor performance, so improvements or changes are only determined after something has gone wrong. Discovering weaknesses in control systems by having a major incident is too late and too costly.”288 Rather, facilities must identify critical controls to monitor and set leading indicators against each one to show that the system is operating as intended. The HSE was one of the earliest regulators to adopt process safety indicators regulations. In 1995, the agency began requiring companies to report health and safety data, and then published annual reports based on those statistics. In 2006, the HSE developed a step-by-step guidance document entitled Developing process safety indicators289 to assist industry. The guide establishes and discusses in detail six main steps necessary to implement a process safety measurement system, including developing leading and lagging indicators. It also defines leading and lagging indicators for each of the controls in the risk control system. According to Jake Molloy, “It is our firm belief that the most influential and effective schemes using indicators to measure improvements and major accident prevention are those initiatives generated by our regulator, the Health and Safety Executive [HSE].”290 As discussed in the previous section, a number of large incidents, including BP Texas City and BP Grangemouth, have highlighted the need for the chemical and other major hazard sectors to demonstrate that risks are being adequately controlled. In response to recommendations stemming from such incidents, the COMAH CA developed an Operational Delivery Guide in 2010 on process safety performance indicators setting out four stages to aid facilities in the development of process safety indicators. The document sets out a goal that by the end of 2015 major hazard establishments and duty holders will measure their safety performance and control of risk by way of key leading and lagging performance indicators. Following the 2005 BP Texas City incident, BP developed company-wide process safety indicators, and now includes process safety metrics in performance contracts for its US refinery managers.291 However, existing guidance in the US pertaining to safety performance indicators does not adequately aid companies in managing major hazards onshore. The CSB has noted that in virtually every incident it investigates in the US, process safety indicators are either not used at all or not used effectively.292 Millions of workplaces around the US primarily measure their safety performance using OSHA

286 Hopkins, Andrew. Disastrous Decisions: The Human and Organisational Causes of the Gulf of Mexico Blowout; CCH Australia Limited, 2012; p 83. 287 HSE. Developing process safety indicators: A step-by-step guide for chemical and major hazard industries; 2006; p 7. http://www.hse.gov.uk/pubns/priced/hsg254.pdf (accessed October 30, 2013). 288 Ibid at 1. 289 Full title is Developing process safety indicators: A step-by-step guide for chemical and major hazard industries; first published in 2006. http://www.hse.gov.uk/pubns/books/hsg254.htm (accessed May 28, 2013). 290 Molloy Testimony. CSB Indicators Public Hearing Transcript; July 24, 2012; p 139. 291 Hopkins, Andrew. Disastrous Decisions: The Human and Organisational Causes of the Gulf of Mexico Blowout; CCH Australia Limited, 2012; p 84. 292 Donald Holmstrom. CSB Indicators Public Hearing Transcript; July 24, 2012; p 13.

Chevron Richmond Refinery Regulatory Report December 2013

57 DRAFT FOR PUBLIC COMMENT recordable injury and illness rates, which include slips, trips, and falls. While collecting this type of data is also necessary in hazardous operations, it is not sufficient. Injury rates do not depict the effectiveness of a high hazard facility’s process safety management program.293 For example, the CSB noted in its BP Texas City investigation that BP’s personal injury metrics were described as being at the best level on record; yet, around this same time, in March 2005, BP Texas City experienced the devastating 15-fatality incident, which resulted from a progressive erosion of process safety performance that was not reflected in injury statistics. Following the BP Texas City incident, a number of key recommendations were made to strengthen guidance on indicators in the US. For example, the Baker Panel294 issued a report (the Baker report) that recommended the incorporation of safety indicators to measure safety performance, and stated: The Panel believes that relying exclusively or predominantly on lagging indicators to assess process safety performance is ill-advised. … BP’s reliance on lagging, after-the-fact indicators of process safety performance rather than leading, predictive measures…impaired BP’s ability to measure, monitor and detect deteriorating or degraded process safety conditions and performance… This failure to use a set of effective performance metrics that includes leading indicators increased the likelihood that the organisation would identify the need for improvements or additional controls only after something had gone wrong.295 The Baker Panel also noted that it was not enough just to develop process indicators: these indicators needed to be meaningful to the company. As such, the Baker Panel also recommended that “a significant proportion of total compensation of refining line managers and supervisors [be] contingent on satisfactorily meeting process safety performance goals…”296 In its final investigation report on the incident, the CSB made a recommendation to API and USW to jointly lead development of a consensus standard for leading and lagging process safety indicators to drive performance improvements in the prevention of major incidents. API responded by issuing RP 754, Process Safety Performance Indicators for the Refining and Petrochemical Industries. However, this voluntary standard, which defines a framework of four tiered indicators that incorporate the concepts of lagging to leading measures, has significant shortcomings, as the CSB described in a two-day public hearing on Safety Performance Indicators that was held in July 2012. The CSB analysis found that the ability of RP 754 to drive performance improvement and inform key stakeholders will be hampered by

293 Ibid. 294 In the aftermath of the BP Texas City Incident, BP followed the recommendation of the CSB and formed an independent panel known as the Baker Panel to conduct a thorough review of the company’s corporate safety culture, safety management systems, and corporate safety oversight at its US refineries. For a copy of their findings and recommendations see http://www.bp.com/liveassets/bp_internet/globalbp/globalbp_uk_english/SP/STAGING/local_assets/assets/pdfs/Bak er_panel_report.pdf (accessed August 13, 2013).

295 Baker, J. The Report of the BP U.S. Refineries Independent Safety Review Panel, 2007; p 194. 296 Ibid at 251.

Chevron Richmond Refinery Regulatory Report December 2013

58 DRAFT FOR PUBLIC COMMENT PSA’s analysis of indicator data showed a decreasing trend in the number of reported hydrocarbon leaks offshore between 2007 and 2010.  lagging indicators with insufficient statistical rigor needed to allow for trending or incremental performance improvements;  the lack of well-defined standardized and normalized leading indicators that are needed for comparison among sites, corporations, or to national averages;  weak employee protection requirements; public reporting requirements that will be ineffective to adequately inform stakeholders; and  the lack of broadly based consensus in the standard’s development process.297 As a result, in 2012 the CSB Board designated the response to the CSB’s recommendation as “open- acceptable,”298 meaning that the recommendations recipient is moving in the right direction, but more remains to be done. The CSB also noted in the Chevron Interim Report the important role the public plays in monitoring safety management systems, and referenced CCPS as promoting the sharing of process safety indicators with the public: Sharing performance metrics and results broadly can engage the public as a partner in holding the organization accountable for process safety performance. Making metrics and performance public can be an especially powerful way of maintaining upper management commitment since it will likely be the CEO or other senior managers who will be called to account by the public if goals are not met or performance declines. Communicating process safety successes also demonstrates to employees and the public that positive change can be, and are being, made within an organization.299 The Petroleum Safety Authority (PSA) in Norway provides annual reports to the public on its website assessing indicators it has collected directly from offshore and onshore major hazard facilities since 2000 and 2006, respectively. The PSA utilizes the indicators data found in these reports to identify critical safety areas that must be targeted for improvement in order to prevent near misses and accidents.300 The onshore report, Risk level in the petroleum industry, Onshore facilities,301, 302 includes a description and explanation of the indicators collected and analysis of these data. In this report PSA notes a decreasing trend in the number of reported hydrocarbon leaks on offshore production

297 CSB Public Hearing: Safety Performance Indicators. July 23-24, 2012; p 26. http://www.csb.gov/events/csb- public-hearing-safety-performance-indicators/ (accessed August 14, 2013). 298 For more information on recommendations status designations, see http://www.csb.gov/recommendations/faq/#5 (accessed June 21, 2013). 299 Center for Chemical Process Safety (CCPS). Guidelines for Process Safety Metrics. 2010; p 109. 300 PSA. Trends in Risk Level: Summary Report 2012 – Norwegian Continental Shelf. 2012; p 1. 301 See http://www.ptil.no/publications/category175.html?ptil_md_art_list-select_group=Category-233. The CSB had the 2010 version of the onshore report translated into English. http://www.ptil.no/getfile.php/PDF/RNNP_2012/Trends%20in%20risk%20level_2012.pdf (accessed September 17,

  1. (accessed September 17, 2013).

302 The corresponding report discussing offshore indicator data is entitled Trends in Risk Level. http://www.ptil.no/getfile.php/PDF/RNNP_2012/Trends%20in%20risk%20level_2012.pdf (accessed September 17, 2013.

Chevron Richmond Refinery Regulatory Report December 2013

59 DRAFT FOR PUBLIC COMMENT facilities between 2007 and 2010.303 However, it is too soon for PSA to assess trends in the onshore indicators data, because the time period for onshore data collection has been relatively short and there are fewer data points with only eight facilities onshore. The PSA also indicated that it will take time for the onshore data to improve as indicators are refined, but recognized that the same approach has already yielded good results in the offshore sector.304 Additional information on data and trends based on safety case regime implementation are provided in Appendix C. 4.6 Regulatory Assessment, Verification, and Intervention To effectively oversee covered facilities and enforce safety case regulations, technically competent regulators review and assess305 safety case reports and utilize preventative inspections and audits to effectively intervene before high-risk activities commence. According to the HSE, “[t]he assessment process is only a part of the COMAH regime and examines at face value the factual information and examines arguments and demonstrations contained in the report against the requirements of the regulations.”306 The HSE places great emphasis during the assessment phase on the adoption of inherently safer designs307 and notes that “[m]ajor accident hazards should be avoided or reduced at source through the application of principles of inherent safety.”308 Conclusions on the adequacy of the safety case report are developed at the end of the assessment process, and, if deficiencies are found, an intervention strategy for the facility is developed to addresses those deficient measures. According to the HSE, assessment of a safety case report or document “is not a discrete activity but leads to further action under the intervention plan for the operator at that establishment.”309 Intervention by the regulator ensures that the facility and its operations are consistent with information provided in the safety case report, and that there are robust systems in place to “reduce the likelihood of hazards and to mitigate their consequences until the associated risks are ALARP.”310311 Under the safety case regulatory regime, the regulator has the authority to accept the safety case report or reject it and require additional measures to further reduce risks. Preventative inspections and audits by a technically competent regulator can also result in deep challenges to industry, which does not typically happen under PSM or RMP. In the UK, the COMAH regulations authorize the CA to

303 PSA. Risk level in the petroleum industry, Onshore facilities. 2010; p 80. 304 Ibid. 305 According to the HSE, the “assessment reviews the documentary evidence in the report and further documentation, as appropriate, which is referred to in the report or requested by the assessor.” HSE. The Safety Report Assessment Manual, Sections 2 to 7. p 3. http://www.hse.gov.uk/comah/sram/s2-7.pdf (November 26, 2013). 306 HSE. The Safety Report Assessment Manual, Sections 8 to 15. p 9. http://www.hse.gov.uk/comah/sram/s8- 15.pdf (accessed October 30, 2013). 307 Ibid at 30. 308 HSE. The Safety Report Assessment Manual, Sections 2 to 7. p 3. http://www.hse.gov.uk/comah/sram/s2-7.pdf (November 26, 2013). 309 HSE. The Safety Report Assessment Manual, Sections 8 to 15. p 4. http://www.hse.gov.uk/comah/sram/s8- 15.pdf (accessed October 30, 2013). 310 HSE. The Safety Report Assessment Manual, Sections 8 to 15. p 30. http://www.hse.gov.uk/comah/sram/s8- 15.pdf (accessed October 30, 2013). 311 According to HSE, essential considerations to ensure ALARP are “the scope of hazard elimination, the adoption of inherently safer designs, whether good practice has been, or is to be adopted, [and] the application of risk- reducing measures where relevant good practice is not yet established.” Ibid at 30 and 31.

Chevron Richmond Refinery Regulatory Report December 2013

60 DRAFT FOR PUBLIC COMMENT The safety case regulatory regime provides the regulator with the tools to accept or a reject a safety case report. organize an adequate system of inspections of establishments or other measures of control appropriate to the type of establishment concerned…[that are] sufficient for a planned and systematic examination of the systems being employed at the establishment, whether of a technical, organisational or managerial nature, so as to ensure…(a) that the operator can demonstrate that he has taken appropriate measures to prevent major accidents; (b) that the operator can demonstrate that he has provided appropriate means for limiting the consequences of major accidents both inside and outside the establishment; (c) that the information contained in any report sent to the competent authority by the operator of the establishment adequately reflects the conditions in the establishment…312 The CSB noted in its BP Texas City Final Investigation Report that in the UK, HSE inspectors thoroughly inspect high hazard facilities annually, and all COMAH-covered facilities are inspected every five years. For the approximately ten petroleum refineries in the UK, detailed planned inspections (ranging from 80 to 150 days) are conducted annually for each refinery by a multidisciplinary team (regulatory inspectors, process safety, mechanical engineering, electrical and instrumentation, and human factors specialists).313 On its website, HSE lists its offshore priorities as safety case assessment;314 verification;315 inspection; investigation; and enforcement.316 In its business plan for 2012-2015, HSE set out a goal of assessing 72 safety cases onshore and 100 safety cases offshore for 2013 and 2014.317 The work required to be conducted to assess a safety case both on and offshore is very resource-intensive (a typical new offshore safety case assessment requires anywhere from 100 to 300 hours of work), and demands that the regulator hire and retain individuals with significant oil and gas experience, specifically in areas such as process safety, human factors, engineering, and organizational performance. In Australia, the Offshore Petroleum and Greenhouse Gas Storage Act 2006 authorizes NOPSEMA to conduct planned inspections of offshore installations to ensure compliance with the Act.318 NOPSEMA notes that planned inspections “are a critical examination of aspects of a facility, its systems and

312 COMAH Regulations 1999 Part 6, Regulation 19(1) and (2). 313 The CSB. Investigation Report: BP Texas City Refinery Explosion and Fire. March 2007; p 205. http://www.csb.gov/assets/1/19/CSBFinalReportBP.pdf (accessed October 29, 2013). 314 An owner or operator (i.e. the duty holder) is required to submit a safety case to HSE for each offshore installation. HSE then assesses the safety case using both regulations and HSE’s “Assessment Principles for Offshore Safety Cases (APOSC) and must accept it before an installation can operate. See http://www.hse.gov.uk/offshore/aposc190306.pdf (accessed July 31, 2013). 315 Duty holders have a duty under the Offshore Installations (Safety Case) Regulations 2005 to put in place and keep under continual review a verification scheme by which assurance is obtained from an independent competent person (ICP) that safety critical elements and the PFEER (Offshore Installations (Prevention of Fire and Explosion, and Emergency Response) specified plant are suitable and remain suitable for the life of the installation. For more information see http://www.hse.gov.uk/offshore/verification.htm (accessed July 31, 2013). 316 See http://www.hse.gov.uk/offshore/priorities.htm (accessed July 15, 2013). 317 HSE. HSE Business Plan 2012-15; June 2012; p 14. http://www.hse.gov.uk/aboutus/strategiesandplans/businessplans/plan1215.pdf (accessed June 3, 2013). 318 Offshore Petroleum and Greenhouse Gas Storage Act 2006, Sections 600 and 601. See http://www.comlaw.gov.au/Series/C2006A00014 (accessed July 15, 2013).

Chevron Richmond Refinery Regulatory Report December 2013

61 DRAFT FOR PUBLIC COMMENT operations with information obtained from the facility safety case.”319 Subjects of planned inspections include risk control measures related to either a Major Accident Event320 or Occupational Health and Safety controls, or both. NOPSEMA states that it conducts at least two per year for each normally manned offshore installation.321 NOPSEMA distinguishes between two types of planned inspections: field-based inspections, which focus on implementation of control measures described in a facility’s safety case, and themed audits, which deal with inspection of organizational issues by following a common theme to direct lines of questioning.322 In a 1992 compliance directive,323 OSHA stated that the primary enforcement model for the PSM standard would be planned, comprehensive, and resource-intensive Program Quality Verification (PQV) inspections.324 These inspections consist of three parts: determining if the elements of a PSM program are in place; evaluating if the programs comply with the requirements of the standard; and verifying compliance with the standard through interviews, data sampling, and field observations. However, OSHA does not make planned inspections, which have the most opportunity for prevention, a high priority. Rather, OSHA lists its inspection priorities as 1) imminent danger situations; 2) fatalities and catastrophes; 3) complaints; 4) referrals; 5) follow-ups; and 6) planned inspections.325 The CSB does not consider reacting to catastrophic or potentially catastrophic incidents and issuing fines on the part of the regulator to be effective substitutes for preventative inspections and audits – especially for high hazard facilities where catastrophic incidents are possible. The CSB noted in its BP Texas City Final Investigation Report that for the 10-year period prior to the Texas City incident, federal OSHA had conducted no planned PQV inspections in oil refineries. As a result, CSB recommended in its report that OSHA strengthen the planned enforcement of the OSHA Process Safety Management (PSM) standard by developing more highly trained and experienced inspectors to conduct more comprehensive inspections, such as the PQV audits envisioned in the 1992 directive, at facilities presenting the greatest risk of a catastrophic accident. The intent of the recommendation was to establish a permanent, ongoing planned comprehensive inspections program. Spurred in part by the CSB’s recommendations, OSHA issued the Petroleum Refinery Process Safety Management National Emphasis Program (NEP) on June 7, 2007.326 The NEP was a federal program that established guidelines for inspecting petroleum refineries to assure compliance with the PSM standard. Unlike the PQV approach to inspections, which “employs a broad, open-ended inspection strategy and

319 NOPSEMA. Inspection Policy; p 2. http://www.nopsema.gov.au/assets/document/N-02000-PL0025- Inspection.pdf (accessed July 15, 2013). 320 Australia’s Offshore Petroleum and Greenhouse Gas Storage Regulations 2009 define an MAE as “an event connected with a facility, including a natural event, having the potential to cause multiple fatalities of person at or near the facility.” Chapter 1.5. See http://www.comlaw.gov.au/Details/F2009L04578/Html/Text#param5 (accessed July 15, 2013). 321 For more information, see http://www.nopsema.gov.au/safety/inspections/ (accessed July 15, 2013). 322 For more information, see http://www.nopsema.gov.au/assets/document/N-02000-PL0025-Inspection.pdf (accessed July 15, 2013). 323 Compliance directives are the main method OSHA uses to communicate plans, inspection methods, and compliance expectations to their Compliance Safety and Health Officers (CSHOs) for enforcing a new regulation. 324 OSHA Instruction CPL 02-02-045 (1994). 325 “OSHA Fact Sheet: OSHA Inspections,” available at http://www.osha.gov/OshDoc/data_General_Facts/factsheet-inspections.pdf (accessed on May 20, 2013). 326 Originally Directive Number CPL 03-00-004. Extended August 18, 2099 as Directive Number CPL 03-00-010 to allow more time to complete NEP inspections under the original CPL 03-00-004.

Chevron Richmond Refinery Regulatory Report December 2013

62 DRAFT FOR PUBLIC COMMENT uses a more global approach to identify compliance deficiencies…,” the NEP “provide[d] a specific tool to evaluate compliance with the [PSM] standard…[which] identifies a particular set of requirements from the PSM standard from which CSHOs [Compliance Safety and Health Officers] are to review documents, interview employees, and verify implementation for specific processes, equipment, and procedures.”327 The NEP inspections were meant to be more targeted and efficient than PQV inspections. However, the inspections being conducted pursuant to the NEP were terminated in 2011 partly because they were very time-consuming and resource-intensive. OSHA has publicly stated328 that NEP inspection hours were roughly 40 times greater than average OSHA inspection hours. OSHA described the NEP as its most effective emphasis program in its history, citing a disturbing number of issues and subsequent citations. In 1999, EPA established an audit329 program to help ensure compliance with the RMP. The audits were intended to provide an independent verification of the information in the RMP and include on-site inspections. Under these requirements, the implementing agency (EPA or a correlating state agency) must “periodically audit” RMPs to review their adequacy and require revisions when necessary to ensure compliance. 330 Between fiscal years (FY) 2010 and 2012, each EPA Region responsible for implementing the RMP program was mandated by EPA to perform inspections331 at five percent of the total number of regulated facilities in the regions, and a certain percentage of these facilities were required to be high-risk.332 In FY 2010, regions were to conduct 10 percent of the inspections at high-risk facilities, and in FYs 2011 and 2012, 25 percent at high-risk facilities.333 Although EPA has acknowledged that “full compliance with the Risk Management Program regulations cannot be determined without on-site or independent verification of all or part of the information

327 CPL 03-00-004, Section X(D)(1). 2007. 328 See Barab, Jordan. OSHA’s Refinery & Chemical National Emphasis Programs. Power Point presentation made at CSB Public Hearing on Process Safety Indicators; July 20, 2012. http://www.csb.gov/UserFiles/file/Barab%20%28OSHA%29%20PowerPoint.pdf (accessed August 14, 2013). Also see Transcript of CSB Public Hearing on Safety Performance Indicators; p 52. http://www.csb.gov/assets/1/19/CSB_20Public_20Hearing.pdf (accessed August 14, 2013). 329 Within Part 68, the term “audit” refers to the process that implementing agencies may use to verify the quality of the RMP submitted to EPA and require revisions when necessary to ensure compliance. RMP audits will generally involve on-site verification of a facility’s underlying risk management program. Section 68.220 of the RMP rule requires implementing agencies to select facilities for audits based on specific criteria, and to follow a specific process for resolving audit findings prior to any enforcement action. See EPA. Guidance for Conducting Risk Management Program Inspections under Clean Air Act Section 112(r); January 2011; p 4. Available at http://www.epa.gov/osweroe1/docs/chem/clean_air_guidance.pdf (accessed June 11, 2013). 330 40 CFR §68.220 (1999). 331 RMP inspections “are different from audits in that facilities are not necessarily selected for inspection based on Part 68 regulatory criteria, and inspections can lead directly to implementing agency enforcement actions for regulatory violations. Also, RMP inspections always involve on-site verification activities.” See EPA, “Guidance for Conducting Risk Management Program Inspections under Clean Air Act Section 112(r).” January 2011; page 4. Available at http://www.epa.gov/osweroe1/docs/chem/clean_air_guidance.pdf (accessed June 11, 2013). 332 Criteria used to determine high-risk includes the number of people in the footprint (if it is more than 100,000); accidental releases reported in the RMP; the hazard index (percentage of chemical quantity above threshold and number of chemicals onsite); and the number of Program Levels 2 or 3. US EPA Region 9 Emergency Prevention and Preparedness Program; Stanislaus County Powerpoint; March 2013. See http://www.condorearth.com/files/08- Enforcement_Priorities-Mary_Wesling.pdf (accessed May 14, 2013). 333 EPA OIG. Improvements Needed in EPA Training and Oversight for Risk Management Program Inspections; March 21, 2013; p 7. http://www.epa.gov/oig/reports/2013/20130321-13-P-0178.pdf (accessed June 11, 2013).

Chevron Richmond Refinery Regulatory Report December 2013

63 DRAFT FOR PUBLIC COMMENT submitted in an RMP[,]”334 the EPA has not effectively implemented the audit and inspection elements of the Risk Management Program. As mentioned above in Section 3.2.2.3.2, the EPA Office of Inspector General (OIG) concluded in 2009 that over half of the RMP-covered facilities identified in the US as high-risk335 had never received an on-site inspection or audit, and over 65 percent of all active RMP facilities had not received an on-site inspection or audit since inception of the RMP program in 1999.336 The EPA OIG also noted that of the 296 uninspected high-risk facilities managed by EPA, 151 of these could each impact 100,000 people or more in a worst-case accident scenario.337 4.7 Independent, Competent, Well-Funded Regulator As noted by NOPSEMA, a safety regulator “provides ‘independent’ assurance to society, governments and industry that companies have identified the risks to health and safety and have put appropriate measures in place to control these risks.”338 To ensure that companies are managing risks and employing the best available standards and technologies, the regulator must be independent,339 well-resourced, and retain a sufficient number of technically competent, experienced, and well-trained staff that can critically assess companies’ safety case reports and performance. Without independent and competent examinations, the safety case report becomes a meaningless document in terms of controlling risk and preventing major accidents. Offshore regulators in the UK and Australia also utilize independent third party specialist safety companies recognized by the regulator. Third party inspectors review important aspects of the safety case, such as safety critical elements340 and performance standards.341 Third party inspections, however, do not take the place of rigorous inspections by the regulator.

334 EPA. Guidance for Conducting Risk Management Program Inspections under Clean Air Act Section 112(r); January 2011; p 4. http://www.epa.gov/osweroe1/docs/chem/clean_air_guidance.pdf (accessed June 11, 2013). 335 A high-risk facility is one that meets one of more of the following characteristics established by the EPA Office of Emergency Management: 1) Facilities whose reported RMP worst-case scenario population exceeds 100,000 people; 2) Any RMP Program facility with a hazard index greater than or equal to 25; and/or 3) Facilities that have had one or more significant accidental releases within the previous five years. See “EPA Office of Inspector General, “Improvements Needed in EPA Training and Oversight for Risk Management Program Inspections.” March 21, 2013; Page 5. Available at http://www.epa.gov/oig/reports/2013/20130321-13-P-0178.pdf (accessed June 11, 2013). 336 EPA OIG. Evaluation Report: EPA Can Improve Implementation of the Risk Management Program for Airborne Chemical Releases; February 10, 2009; p 15. 337 Ibid. 338 See http://www.nopsema.gov.au/safety/safety-case/safety-case-approach/ (accessed May 31, 2013). 339 You will find a more detailed discussion of regulator independence in the CSB’s upcoming Macondo Final Investigation Report. 340 The UK HSE requires offshore installations to define “safety critical elements,” which are the technical barriers in place for the prevention, detection, control, and mitigation of major accident risks. Lauder, Bob. Major Hazard (Asset Integrity) Key Performance Indicators in use in the UK Offshore Oil and Gas Industry. Paper at the CSB Indicators Public Hearing. July 24, 2012. 341 In the UK, duty holders have a duty under the Offshore Installations (Safety Case) Regulations 2005 to “put in place and keep under continual review a verification scheme by means of which assurance is obtained from an independent competent person (ICP) that safety critical elements and PFEER [Offshore Installations ) Prevention of Fire and Explosion, and Emergency Response] specified plant are suitable and remain suitable for the lifetime of the installation.” See http://www.hse.gov.uk/offshore/verification.htm (accessed November 14, 2013).

Chevron Richmond Refinery Regulatory Report December 2013

64 DRAFT FOR PUBLIC COMMENT As of June 2012, the HSE employed roughly 3,300 staff, of which 1,381were front-line inspectors,342 whose responsibilities include conducting preventative inspections of roughly 950 COMAH facilities throughout the UK. The HSE employs roughly 105 inspectors to inspect approximately 300 offshore installations, in effect a one to three ratio. As such, the HSE, with a budget of roughly $472 million,343 has the authority to offer higher specialist salaries to attract and retain more experienced, competent personnel. According to information obtained from the HSE, in 2011 and 2012 their onshore specialist inspector pay ranged from $85,806 to $102,344, and their offshore inspector pay ranged from $134,387 to $148,423 at the highest grade and $116,288 to $131,499 at the next highest grade.344 A safety case regime requires regulators to conduct preventative facility inspections and audits against the safety case to ensure that specified controls are functioning as intended. Regulators must be capable of interacting as equals with company risk managers when conducting these inspections. Former HSE staff have communicated to the CSB that HSE seeks new employees with good communication skills in addition to education and experience, as the job of a safety case regulator requires encouraging companies to aspire to make safety improvements that they may not want to make. One message that current and former HSE staff have repeated is that the industry believes having competent regulatory staff adds significant value to their business.345 In any country, competent offshore regulatory staff can persuade companies to manage risks in a rigorous manner, knowing that if not done properly, their risk management practices will be challenged.346 This competence is also essential for companies’ confidence in the accuracy of the regulatory staff’s advice, inspections, and citations. According to a literature review on the safety case in the UK, “[s]ome companies see as positive the requirement to have ‘someone external to the company keeping you on your toes by regularly asking if you have done all you can,’ and that it ‘forces you to convince yourself’ that you have covered all the risks.”347 In the US, the federal government has used extensive resources to retain the best available talent to focus on health and safety oversight of US commercial and defense nuclear facilities.348 For instance, many nonsupervisory technical staff at the US Nuclear Regulatory Commission349 (NRC) and the Defense

342 HSE. The Health and Safety Executive Annual Report and Accounts 2011/12; July 2012; p 30. http://www.hse.gov.uk/aboutus/reports/1112/ar1112.pdf (accessed June 3, 2013). 343 For 2013/2014, HSE’s budget is listed as 308.1 £million. HSE recovers approximately 40 percent of its costs through income mainly in the nuclear, offshore, and chemical sectors, and the remainder is funded from Grant-in- Aid pursuant to the Health and Safety at Work etc. Act 1974, and fee for intervention (FFI).343 See HSE, “HSE Business Plan 2012-15,” July 2012; page 17. Available at http://www.hse.gov.uk/aboutus/strategiesandplans/businessplans/plan1215.pdf (accessed June 3, 2013). Conversion of UK Pounds to US Dollars is based on 1£ = 1.5313$. See http://wsj.com/mdc/public/page/2_3021-forex.html (accessed June 4, 2013). 344 Conversion of UK Pounds to US Dollars is based on 1£ = 1.5313$. See http://wsj.com/mdc/public/page/2_3021- forex.html (accessed June 4, 2013). 345 Based on conversations between the CSB staff and Mange Ognedal (Norway PSA), Ian Whewell (the UK HSE), Peter Wilkinson (Australia NOPSEMA), and John Clegg (Australia NOPSEMA). 346 Peter Wilkinson, Manager Review Implementation Team, Offshore Safety Section, Australia Department of Industry, Tourism and Resources, Presentation to the National Research Centre for Occupational Health and Safety, ANU (May 15, 2002). 347 Vectra Group Limited. Literature Review on the Perceived Benefits and Disadvantages of UK Safety Case Regimes; 2003; p 40. 348 DNFSB FY2013 Budget Justification at p. 100 http://www.dnfsb.gov/sites/default/files/About/Budget%20Requests/2013/FY%202013_CONG%20BUDGET_FIN AL.PDF (accessed May 15, 2013). 349 Presentation by NRC Executive Director Bill Borchardt, January 2011.

Chevron Richmond Refinery Regulatory Report December 2013

65 DRAFT FOR PUBLIC COMMENT Nuclear Facilities Safety Board are paid at the top of the General Schedule pay schedule.350 Virtually all technical staff at the Defense Nuclear Facilities Safety Board hold technical master’s degrees and approximately 25 percent hold doctoral degrees.351 The federal government has a unique category of non-executive positions that involve high-level research and development in the physical, biological, medical, or engineering sciences, or a closely-related field.352 These are known as “Scientific or Professional” positions, and they are classified above the highest general schedule pay level.353 These special salary authorizations contribute to the technical agencies’ ability to compete with private industry to recruit and retain highly competent staff. The NRC also has a type of funding mechanism that ensures that the agency’s budget adequately covers its regulator activities, as the NRC is required by law to recover at least 90 percent of its budget through licensing and inspection fees.354 Another method by which the NRC is able to attract and retain competent technical staff is its extensive training programs. For new inspection staff, the NRC requires a series of courses, assessments, and simulation, all of which takes approximately two years to complete.355 Inspectors must have a bachelor’s degree in engineering or a degree in a relevant scientific field and Professional Engineer certification.356 The agency operates a technical training center in Chattanooga, Tennessee, with various control room simulators that mirror licensees’ facilities. The NRC staff is expected to sufficiently understand this equipment so that they are able to conduct sufficient audits and investigations.357 Before he or she is fully qualified to conduct inspections, inspector candidates must be recommended by the NRC inspector qualification board and certified by the regional administrator or division director.358 As will be discussed in greater detail under Section 5.0, at the time of the Chevron incident, a majority of the regulators responsible for oversight of Chevron and other petroleum refineries in California did not have sufficient, sustainable funding or staffing to oversee major accident prevention activities. An effective safety case regulatory system would necessitate that the California industry regulator be well- resourced and retain a sufficient number of competent, well-trained and experienced staff to critically assess a company’s safety case. The overall knowledge and expertise of the regulator must at a minimum match that of industry in order for the regulator to successfully assess a company’s safety case with the ultimate goal of preventing major accidents.

350 $123,758 to $155,500 per year in 2012 in Washington, DC. See https://www.opm.gov/oca/12tables/html/dcb.asp (accessed May 15, 2013). 351 DNFSB FY2013 Budget Justification at p. 100 http://www.dnfsb.gov/sites/default/files/About/Budget%20Requests/2013/FY%202013_CONG%20BUDGET_FIN AL.PDF (accessed May 15, 2013). 352 http://www.opm.gov/ses/recruitment/stpositions.asp (accessed May 15, 2013). 353 http://www.opm.gov/ses/recruitment/stpositions.asp (accessed May 15, 2013). 354 Section 6101 “NRC User Fees and Annual Charges,” Omnibus Budget Reconciliation Act, Pub. L. 103-66. 107 Stat. 312 (Aug. 10, 1993). 355 NRC Inspection Manual, Qualification Program for Operating Reactor Programs (Ch. 1245) at 4, available at http://pbadupws.nrc.gov/docs/ML1110/ML11105A153.pdf (accessed May 28, 2013). 356 NRC Reactor Inspector Job Posting No. R-I/DRS-2013-0001 357 See, e.g., http://www.iaea.org/ns/tutorials/regcontrol/regbody/reg2124.htm (accessed May 28, 2013). 358 NRC Inspection Manual, Qualification Program for Operating Reactor Programs (Ch. 1245) available at http://pbadupws.nrc.gov/docs/ML1110/ML11105A153.pdf

Chevron Richmond Refinery Regulatory Report December 2013

66 DRAFT FOR PUBLIC COMMENT

Chevron Richmond Refinery Regulatory Report December 2013

67 DRAFT FOR PUBLIC COMMENT 5.0 Oversight of Petroleum Refineries in California

In California, there currently exists a patchwork of primarily activity-based federal, state, and local laws and regulations aimed at preventing harmful releases of hazardous materials at facilities such as petroleum refineries. This regulatory framework does not foster continuous improvement by driving companies to reduce risks of their hazardous activities to ALARP, nor does it have the requisite number of regulatory staff with the skills, knowledge, and experience to provide sufficient oversight. 5.1 Cal/OSHA 5.1.1 Background Information Section 18 of the OSHAct359 encourages states to develop and implement their own job safety and health programs. Twenty-five states (including California), Puerto Rico and the Virgin Islands currently implement OSHA-approved State Plans.360 States must set job safety and health standards that are “at least as effective as” comparable federal standards; most adopt standards that are identical to the federal standards.361 California was certified as an OSHA State Plan state on August 12, 1977.362 California’s Division of Occupational Safety and Health (Cal/OSHA) administers the California Occupational Safety and Health Program. A PSM District Office363 within Cal/OSHA enforces California’s PSM standard, which is established under Title 8, Section 5189 of the California Code of Regulations (CCR) and entitled Process Safety Management of Acutely Hazardous Materials.364,365 The PSM District Office is comprised of seven inspectors, known as Associate Safety Engineers, and one District Manager to regulate nearly 1,700 PSM-covered facilities in California, including 15 petroleum refineries. Only one of these individuals has a technical background, with a degree in Chemical Engineering. Appendix B of this report summarizes the key differences between the federal and California PSM standards and the safety case regulatory regime. A more detailed analysis of those differences will be provided in the remainder of Section 5.1.

The CSB in its Interim Report identified a number of weaknesses of Chevron’s process safety performance. In many of these causal issues, Chevron was not required to perform at a more effective level by the existing California PSM regulations. In Table 1 below, the CSB identifies the causal issues or findings, which highlight the gaps in the California and federal PSM regulations, and how each issue is more effectively managed in the safety case regulatory regime. In this section of the report, some of these examples will be examined in relation to key features of an effective regulatory approach such as the

359 29 U.S.C. §667 (2004). 360 These are referred to informally as OSHA State Plans. OSHA approves and monitors State plans and provides up to 50 percent of an approved plan's operating costs 361 29 U.S.C. §667 (c)(2) (2004). Also see http://www.osha.gov/dcsp/osp/faq.html (accessed May 13, 2013). 362 See http://www.osha.gov/dcsp/osp/stateprogs/california.html (accessed June 17, 2013). 363 The California PSM District Offices were established in 2001 after the February 1999 Tosco refinery incident in which four workers were fatally injured following the ignition of a highly flammable material during a turnaround operation. In January 2012 the two district offices were combined into one PSM District Office. 364 See http://www.osha.gov/dcsp/osp/stateprogs/california.html (accessed May 13, 2013). 365 8 CCR §5189 (2012).

Chevron Richmond Refinery Regulatory Report December 2013

68 DRAFT FOR PUBLIC COMMENT safety case. More information on these causal findings can also be found in the CSB Chevron Interim Report.

Process Safety Element Causal Finding California PSM Regulation The Safety Case Regulatory Regime** MOC Inspection recommendation to upgrade pipe to 9- Chrome not implemented. The MOC to implement the recommendation narrowed the scope allowing the 52- inch component that failed to remain in service. Implementation of 9- Chrome could have prevented the incident.366 MOC element requires implementation of written procedures to manage changes that shall address the impact of the change on health and safety; however the element is activity based and there is no requirement to implement effective recommendations or control hazards. There is no requirement in the MOC element to consider inherent safety. Cal/OSHA did not cite Chevron for this issue. Duty holder is required to drive risk to ALARP. Description of MOC procedures and demonstration of their effectiveness in managing major accident hazard risk are a key requirement of the safety case. Implementation of the concept of inherent safety is required.367

 Unless otherwise noted, California and federal PSM requirements are nearly identical. ** Regulatory regimes such as offshore in Norway have many attributes of the safety case regulatory regime but are not called the safety case regulatory regime. 366 For more information, see CSB’s Chevron Richmond Refinery Interim Investigation Report. April 2013; p 41 and 42. http://www.csb.gov/assets/1/19/Chevron_Interim_Report_Final_2013-04-17.pdf (accessed October 30, 2013). 367 According to the HSE, essential considerations for determining whether a duty holder has reduced risks to ALARP include “the adoption of inherently safer designs…”. HSE. The Safety Report Assessment Manual, Sections 8 to 15. p 30. http://www.hse.gov.uk/comah/sram/s8-15.pdf (accessed October 30, 2013). The HSE also notes that the guidance to COMAH Regulation 4 (General Duty) “describes the application of all measures necessary to reduce risk of a major accident to ALARP based on a hierarchical approach (inherent safety, prevention, control, mitigation).” Ibid at 8.

Chevron Richmond Refinery Regulatory Report December 2013

69 DRAFT FOR PUBLIC COMMENT Process Safety Element Causal Finding California PSM Regulation The Safety Case Regulatory Regime** MOC Chevron conducted MOCs to evaluate proposed changes to crude feed that introduced higher sulfur concentration. However, Chevron failed to thoroughly evaluate the change of increasing sulfur weight percentage in crude oil feed and to assess how it might affect corrosion rates within the 4-sidecut piping circuit. Cal/OSHA did not issue any citations for failing to consider the impact of corrosion in the MOC process when sulfur composition in the crude oil feed was increased.368 MOC element is activity- based rather than performance based and requirements in RAGAGEP such as API 570369 do not apply to the MOC element of PSM. Cal/OSHA did not cite Chevron for this issue. Duty holder is required to drive risk to ALARP. Duty holder must identify in the safety case report the standards that they are using to reduce risk such as API 570. The implementation of those standards can be enforced by the regulator to achieve ALARP. PHA In its 2009 crude unit PHA, Chevron simply cited non- specific, judgment-based qualitative safeguards such as: utilizing metallurgy to minimize corrosion, having effective maintenance and inspection programs, and providing pipe wall corrosion allowances. The effectiveness of these safeguards was neither evaluated nor documented; instead the safeguards were merely listed in the PHA. While the PHA element requires addressing the control of hazards, it does not require addressing the effectiveness of the controls or using the hierarchy of controls. For example, the standard would not require the use of improved metallurgy or inherent safety to mitigate corrosion hazards. Cal/OSHA did not cite Chevron for this issue. Requires the use of the most effective practical safeguards to achieve ALARP. The safety case requires the use of inherently safer design and the hierarchy of controls.370

368 For more information, see CSB’s Chevron Richmond Refinery Interim Investigation Report. April 2013; p 34, 35 and 36. http://www.csb.gov/assets/1/19/Chevron_Interim_Report_Final_2013-04-17.pdf (accessed October 30, 2013). 369 API 570. Piping Inspection Code: In-service Inspection, Rating, Repair, and Alteration of Piping Systems. November 2009. 370 According to the HSE, essential considerations for determining whether a duty holder has reduced risks to ALARP include “the adoption of inherently safer designs…”. HSE. The Safety Report Assessment Manual, Sections 8 to 15. p 30. http://www.hse.gov.uk/comah/sram/s8-15.pdf (accessed October 30, 2013). The HSE also notes that the guidance to COMAH Regulation 4 (General Duty) “describes the application of all measures necessary to reduce risk of a major accident to ALARP based on a hierarchical approach (inherent safety, prevention, control, mitigation).” Ibid at 8.

Chevron Richmond Refinery Regulatory Report December 2013

70 DRAFT FOR PUBLIC COMMENT Process Safety Element Causal Finding California PSM Regulation The Safety Case Regulatory Regime** PHA The 4-sidecut line was analyzed in the most recent crude unit PHA. Corrosion was not identified as a potential cause of a leak/rupture in the piping. Damage mechanism hazard reviews are not required by the PSM regulation. The process hazard analysis element does not require consideration of RAGAGEP such as API RP 571, Damage Mechanisms Affecting Fixed Equipment in the Refining Industry. Cal/OSHA did not cite Chevron for this issue. For example in the UK the HSE has worked with the industry to develop guidance on damage mechanism hazard reviews in the UK's offshore petrochemical industry. The implementation of best practice standards referenced by a duty holder’s safety case report may be enforced by the regulator to achieve ALARP. Incident Investigations Chevron made recommendations following its investigation of sulfidation incidents at Richmond, Salt Lake City and Pascagoula refineries requiring 100 percent component inspection in high risk piping systems. These recommendations were not implemented in the Richmond refinery crude unit prior to the incident. In 2007 Chevron identified the inherently safer solution of improved metallurgy to prevent sulfidation corrosion but only applied it to the crude unit small spool piece that failed. Neither California nor federal PSM regulations require root cause investigations or recommendations to be developed as the result of incident investigations. While California does require taking action to prevent reoccurrence, (goes beyond federal OSHA) it does not drive risk to ALARP. Cal/OSHA did not cite Chevron for this issue. Federal PSM does not require the development of recommendations or the prevention of future incidents. Investigation of incidents is required to demonstrate legal compliance with framework legislation. ALARP requirement would require remedial action including cross- company learning from incident investigations. HSE can require safety case duty holder compliance with investigation report recommendations (e.g. Buncefield Report- “determine SIL level requirements for overfill protection”).

Chevron Richmond Refinery Regulatory Report December 2013

71 DRAFT FOR PUBLIC COMMENT Process Safety Element Causal Finding California PSM Regulation The Safety Case Regulatory Regime** Mechanical Integrity Chevron was instrumental in the development of API RP 939-C, which suggests ("should") but does not require ("shall") that 100 percent component inspection be performed. API states that the use of "shall" denotes minimum requirements in the use of the standard - API RP 939- C has no minimum requirements (no substantive "shalls" are used in the recommended practice). The mechanical integrity element of PSM requires that for inspection and testing procedures, employers follow RAGAGEP. However, API RP 939-C has no minimum requirements. Nonetheless, Cal/OSHA cited Chevron for failure to follow API RP 939-C under this mechanical integrity provision. In the federal regulatory context, this approach has been called into question by the recent administrative law judge decision in BP Products. This case is scheduled for review by the full commission. In a safety case regime, the regulator can reject the use of weak and inadequate standards referenced in a safety case report (by rejecting the report) and can require more rigorous performance to achieve ALARP.

Chevron Richmond Refinery Regulatory Report December 2013

72 DRAFT FOR PUBLIC COMMENT Process Safety Element Causal Finding California PSM Regulation The Safety Case Regulatory Regime** Inherent Safety Chevron employees have recommended implementing inherently safer designs through the MOC process, incident investigations, technical reports, and past employee recommendations. However, the CSB has not identified any documented, thorough analysis of the proposed inherently safer solutions. In addition, Chevron has repeatedly failed to implement proposed inherently safer recommendations. Had Chevron implemented these recommendations, the incident could have been prevented. Neither California nor federal PSM regulations require the use or implementation of inherent safety. Cal/OSHA did not cite Chevron for this issue. In its Interim Report, the CSB made a recommendation to the California legislature and the Governor of California to use inherently safer systems analysis and the hierarchy of controls to the greatest extent feasible in establishing safeguards for identified process hazards. Safety case requires the implementation of inherently safer systems analysis.371 Regulator Enforcement Despite numerous safety system deficiencies the Cal/OSHA regulator failed to identify these issues prior to the incident. Cal/OSHA conducted three planned inspections prior to the incident that resulted in no citations or fines. The CSB determined Cal/OSHA lacked sufficient resources and numbers of highly qualified inspectors. California is adding 15 additional inspectors to its PSM unit. The Governor's Interagency Task Force on Refinery Safety will be proposing to implement additional recommendations from their draft report. A key feature of the safety case is a rigorous review of the safety case report that may be accepted or rejected by the regulator. Preventative audits of covered facilities are regularly performed by technically competent, well resourced regulators.

371 According to the HSE, essential considerations for determining whether a duty holder has reduced risks to ALARP include “the adoption of inherently safer designs…”. HSE. The Safety Report Assessment Manual, Sections 8 to 15. p 30. http://www.hse.gov.uk/comah/sram/s8-15.pdf (accessed October 30, 2013). The HSE also notes that the guidance to COMAH Regulation 4 (General Duty) “describes the application of all measures necessary to reduce risk of a major accident to ALARP based on a hierarchical approach (inherent safety, prevention, control, mitigation).” Ibid at 8.

Chevron Richmond Refinery Regulatory Report December 2013

73 DRAFT FOR PUBLIC COMMENT Process Safety Element Causal Finding California PSM Regulation The Safety Case Regulatory Regime** Workforce Involvement The workers in previous loss of containment incidents raised concerns about the level of corrosion in the Crude and RLOP incidents, but their concerns were not effectively addressed prior to the August 6, 2012, incident. The workforce participation element requires an employer to develop a written plan to "ensure employee participation in process safety management.” including "consultation with employees and their representatives on the conduct and development of the elements of process safety management...” However, development of a written plan to satisfy the regulatory requirements does not ensure that workers and their representatives in practice are able to effectively participate in a company's safety management system such as PHAs, MOCs, and investigation activities. Safety case sets out a legal framework for the participation of employees on health and safety-related matters, the election of safety representatives, and the establishment of safety committees to serve health and safety related functions. Workforce participation practices are documented by the duty holder and submitted to the regulator.

Table 1. CSB Causal Findings.

  1. 1.2

Analysis 5.1.2.1 ALARP Unlike the OSHAct, the California Occupational Safety and Health Act does not have a General Duty Clause. Rather, Section 5189 was established to “eliminate to a substantial degree, the risks to which employees are exposed in petroleum refineries, chemical plants and other facilities.”372 By focusing on the significant reduction of risk, this language supports the principle of ALARP, which requires a showing by the company that “there are no other practical measures that could reasonably be taken to reduce risks further.”373 However, this section, which lays out the “scope and purpose” of the regulation, is not an enforceable element of the regulation that is subject to citations, and the remaining PSM regulation elements do not lead in practice to that result. Rather, California’s PSM standard has remained activity-based, with many activity-based elements almost identical to the federal PSM standard. For example, an employer must “perform a hazard analysis [PHA] appropriate to the complexity of the

372 8 CCR §5189 (a) (2012). 373 ALARP Guidance Note N-04-300-GN0166, Rev. 3 (Dec. 2011) available at http://www.nopsema.gov.au/assets/document/N-04300-GN0166-ALARP.pdf (accessed May 15, 2013).

Chevron Richmond Refinery Regulatory Report December 2013

74 DRAFT FOR PUBLIC COMMENT process for identifying, evaluating, and controlling hazards involved in the process...”374 The PHA must address hazards of the process; engineering and administrative controls applicable to the hazards and their relationships; consequences of failure of these controls; facility siting; human factors; a qualitative evaluation of a range of the possible safety and health effects of the failure of controls on facility employees; and the identification of any previous incident which had a likely potential for catastrophic consequences in the workplace.”375 This language does not support the principle of ALARP, and makes no mention of risk or continuous improvement in any way. As a result, PHAs satisfy the California PSM regulatory requirement by merely listing safeguards; there is no requirement to evaluate or document the effectiveness of these safeguards, or to show that the safeguards in place are effectively reducing risks. As discussed in the CSB’s Interim Report on the Chevron incident, Chevron cited in its 2009 crude unit PHA non-specific, judgment-based qualitative safeguards such as: utilizing metallurgy to minimize corrosion, having effective maintenance and inspection programs, and providing pipe wall corrosion allowances.376 The effectiveness of these safeguards was neither evaluated nor documented. Had the adequacy of these safeguards been verified, improved safeguards intended to protect against sulfidation- induced failure of carbon steel piping could have been recommended. In addition, while the 4-sidecut line was analyzed in this PHA, corrosion was not identified as a potential cause of a leak/rupture in the piping (emphasis added). A corrosion review, also referred to as a damage mechanism hazard review, analyzes hazards presented by all process failure mechanisms such as corrosion and cracking. This type of review, while considered to be good practice,377 is not required by the PSM regulations either federally or in California, and as such the CSB made a recommendation in its Interim Report to require these in future California PHAs. Under a safety case regulatory regime, the regulator has the ability to drive industry to adapt new technologies and safer practices as soon as they are developed; new rulemaking is not required for immediate improvements, because companies are obligated to continually work toward specified performance goals such as reducing risks to ALARP. Therefore, under a safety case regulatory regime the regulator could require these types of reviews to be conducted to reduce risk without requiring additional legislation. Cal/OSHA does not typically review a company’s PHA as part of its routine oversight of process safety management unless there is a specific complaint, accident, or targeted inspection. Nor does it “accept” a company’s PHA and proposed hazard mitigations. Therefore, prior to the August 2012 incident, Cal/OSHA inspectors did not require any additional information or analysis to be provided in the Chevron crude unit PHA. Highlighting the reactive nature of the PSM standard, Cal/OSHA inspected the Chevron facility post-incident and issued 17 citations related to the incident and eight additional citations, with a total proposed fine of nearly $1 million. Only one citation related to PHAs, and it was not associated with evaluating the effectiveness of safeguards or failure to control the 4-sidecut corrosion hazard. Rather, the emphasis was that Chevron’s PHA did not adequately account for hazards caused by other units

374 8 CCR §5189 (e)(1) (2012). 375 8 CCR §5189 (e)(2) (A) through (G) (2012). 376 Corrosion allowance refers to extra wall thickness added as a safety factor to the design of a piece of equipment beyond that needed solely for mechanical considerations such as design temperature and pressure. This extra thickness is provided to accommodate for expected loss of wall thickness due to corrosion over the life of the equipment. 377 API RP 571, Damage Mechanisms Affecting Fixed Equipment in the Refining Industry, describes common process failure mechanism and is considered to be good practice for analyzing risks presented by process failure mechanisms such as corrosion and cracking.

Chevron Richmond Refinery Regulatory Report December 2013

75 DRAFT FOR PUBLIC COMMENT associated with the crude unit. This again highlights the lack of a requirement for Chevron to demonstrate that risks have been reduced to ALARP, or for Chevron to provide this type of analysis to Cal/OSHA to review.

  1. 1.2.2

Adaptability and Continuous Improvement

Of the 25 Cal/OSHA citations mentioned above, two were issued to Chevron for its failure to follow API RP 939-C, Guidelines for Avoiding Sulfidation (Sulfidic) Corrosion Failures in Oil Refineries as RAGAGEP. This voluntary API standard will be discussed in greater detail in the CSB’s Final Investigation Report on the Chevron incident. However, it is important to note for purposes of this report that API RP 939-C is a permissive, voluntary standard merely intended to provide guidance to industry personnel on how to address sulfidation corrosion in petroleum refining operations. Existing safety guidelines use words “shall” and “should” to denote either requirements or recommendations. API RP 939-C does not use the word “shall”; as such, it contains no requirements for industry. While the regulator in a safety case regulatory regime has the authority to analyze and challenge the requirements of API RP 939-C with the goal of driving continuous improvement and risk reduction (note the Buncefield examples discussed in Section 4.3), in the present case Cal/OSHA utilized the voluntary practice as an opportunity to issue a citation to Chevron post-incident. Cal/OSHA did not analyze API RP 939-C to determine whether its provisions are sufficient to reduce risks and manage hazards. It also remains to be seen whether this citation will be upheld considering the permissive language contained within the standard. Chevron has investigated a number of sulfidation incidents at its refineries over the years, including Richmond, Salt Lake City, and Pascagoula. Figure 2 shows a timeline of Chevron’s key sulfidation events. In January 2007, a failure due to sulfidation corrosion caused a serious fire in the Chevron Richmond Refinery crude unit resulting in a CWS Level 3 alert, injuring one worker and initiating a shelter-in-place for the surrounding community. As a result of these investigations, Chevron made internal recommendations to require 100 percent component inspections in high-risk piping systems. However, these recommendations were not implemented in the Richmond Refinery crude unit prior to the incident, highlighting a lack of learning from previous incidents by Chevron.

Chevron Richmond Refinery Regulatory Report December 2013

76 DRAFT FOR PUBLIC COMMENT

Figure 2. Chevron's key sulfidation events between 1974 and 2013.

In addition, as a result of the January 2007 incident, Chevron informed Contra Costa Health Services’ Hazardous Materials Program378 (CCHMP) in a letter that the crude unit piping metallurgy had been upgraded following this incident as an inherently safer solution. However, the CSB learned that this upgrade was limited to only the immediate piping spool379 that failed. Cal/OSHA also did not require Chevron to update the crude unit PHA to address the findings from this incident. Under a safety case regulatory regime, the regulator would work with the company to improve its practices following such an incident. The company would also be required to update its safety case report to address these corrosion hazards and demonstrate how the company has reduced risks to ALARP. The CSB also noted in its Chevron Interim Report that despite internal recommendations to replace the entire #4 sidecut piping with an inherently safer, more corrosion-resistant material of construction, Chevron’s 2006 Management of Change (MOC) analysis limited the application of those recommendations. Instead of replacing the entire piping segment identified by the original recommendation, the 2006 MOC considered only the replacement of a small section. Although the recommendation was intended to more broadly apply inherently safer materials of construction, the final implementation under the 2006 MOC limited the application of this more corrosion resistant

378 Contra Costa Health Services’ Hazardous Materials program is designed to respond to emergencies and monitor hazardous materials within Contra Costa County. See http://cchealth.org/hazmat/ (accessed April 17, 2013). CCHSHMP also implements the CalARP and ISO programs, which will be discussed in greater detail later on. 379 A piping spool is a small, removable section of piping. In some cases, a piping spool is installed or removed in order to provide a temporary connection or complete disconnection between two piping circuits.

Chevron Richmond Refinery Regulatory Report December 2013

77 DRAFT FOR PUBLIC COMMENT metallurgy.380 As the mere completion of an MOC and the implementation of any action item satisfy the California PSM standard requirements, regardless of its adequacy or effectiveness, Cal/OSHA did not evaluate the MOC or cite Chevron for narrowing the scope of the MOC, despite its disregard of internal recommendations. Neither the California nor the federal PSM standards allow citations for inadequate MOCs. In addition, RAGAGEP does not apply to the MOC PSM element. This can be contrasted with the safety case regulatory regime in the UK, where the HSE includes the adoption of inherently safer designs as an essential consideration for determining whether a duty holder has reduced risks to ALARP.381 The HSE also notes that the guidance to COMAH Regulation 4, (the COMAH General Duty provision) “describes the application of all measures necessary to reduce risk of a major accident to ALARP based on a hierarchical approach (inherent safety, prevention, control, mitigation).”382 5.1.2.3 Process Safety Indicators As the CSB has noted in its BP Texas City Investigation Report, Chevron Interim Report, and Section 4.5 of this report, process safety indicators are a significant element of process safety management systems and are critical for reducing process safety incidents. A major goal of process safety indicators is to drive continuous process safety improvement. Regulators can utilize these indicators to focus inspections, audits, and investigations.

Federally and in the state of California, neither the PSM standard nor the RMP rule require companies to utilize or report process safety indicators. Chevron voluntarily utilizes both leading and lagging indicators internally in its US petroleum refineries, in a system called Operational Excellence and Reliability Intelligence (OERI), which tracks 26 different process safety indicators. OERI was implemented in May 2009. However, Chevron is not required to report the status of its indicators to California regulators. Nor is Chevron held accountable to use the indicators to drive performance or continuous improvement. As a result, in its Interim Report, the CSB made a recommendation to the California State Legislature to identify and require the reporting of leading and lagging process safety indicators to state and local regulatory agencies, with the goal of improving mechanical integrity and process hazard analysis performance at all California petroleum refineries, and preventing major chemical incidents. 5.1.2.4 Inspections As noted in Section 4.6, safety case regulators utilize preventative inspections and audits to monitor compliance with legislation and to ensure that the facility and its operations are consistent with information provided in the safety case. However, like federal OSHA, California regulations require Cal/OSHA to prioritize accident, complaint, and referral-based inspections over planned inspections. As such, Cal/OSHA’s inspection program of the nearly 1,700 PSM-regulated facilities in California,

380 As discussed in the Interim Report, only the section of piping downstream of the pumps was replaced with 9- Chrome. 381 HSE. The Safety Report Assessment Manual, Sections 8 to 15. p 30. http://www.hse.gov.uk/comah/sram/s8- 15.pdf (accessed October 30, 2013). 382 Ibid at 8.

Chevron Richmond Refinery Regulatory Report December 2013

78 DRAFT FOR PUBLIC COMMENT including 15 petroleum refineries, 383 has been reactive in nature rather than proactive to maximize prevention. OSHA State Plan states384 were strongly encouraged but not required to implement the federal Petroleum Refinery NEP. Cal/OSHA did not adopt the NEP “because of its dedicated PSM Unit.”385 Between 2006 and August 6, 2012, the Cal/OSHA PSM District Office conducted only three planned inspections of the Chevron Richmond facility, totaling only 150 inspector hours of effort. Cal/OSHA has acknowledged that these were not PQV inspections, as envisioned in its mission statement and in the federal PSM compliance directive. None of these inspections resulted in citations or fines. According to statistics provided by OSHA, federal NEP refinery inspections conducted between 2007 and the end of 2011 required roughly 1,000 inspector hours each and resulted in an average of 11.2 violations and $76,821 in penalties per inspection. OSHA noted that hours spent on a typical federal refinery NEP inspection were 40 times greater than the average OSHA inspection. These numbers indicate a major disparity in thoroughness and comprehensiveness between the planned inspections conducted by Cal/OSHA and the NEP inspections conducted by OSHA and other OSHA State Plan States. The federal NEP, which represented a more robust and intensive inspection program, was terminated in 2011 due to the stated great demand on OSHA resources. 5.1.2.5 Workforce Participation Like the federal PSM standard, California’s PSM standard provides for workforce participation in a company’s process safety management program. 8 CCR §5189 (p) requires an employer to develop a written plan to “ensure employee participation in process safety management” including “consultation with employees and their representatives on the conduct and development of the elements of process safety management…”386 However, developing a written plan to satisfy the regulatory requirements does not ensure that workers and their representatives in practice are able to effectively participate in a company’s process safety management systems. In its investigation of the Chevron incident, the CSB noted that the Chevron Richmond Refinery workforce and its representatives, the United Steelworkers (USW), had expressed concerns regarding sulfidation corrosion and broader workplace safety issues, but were not consistently listened to by Chevron managers, and their concerns regarding corrosion were not adequately acted upon. In November 2011, Cal/OSHA investigated a complaint of unsafe working conditions during the fourth quarter Richmond Lube Oil Plant (RLOP) turnaround at the Richmond Refinery. The RLOP receives feedstock from the crude unit where the August 6th incident occurred and has similar sulfidation corrosion concerns. During the shutdown of the RLOP, a fire occurred at one of the RLOP furnaces. According to Cal/OSHA’s inspection report, Chevron employees told Cal/OSHA that “OPERATORS GET IGNORED.” Many of the employees were concerned about increased corrosion they were finding during the turnaround, and believed that increased temperatures and throughput rates had an adverse effect on

383 Also see the California Labor Code Sections 6309 to 6315 (The California Occupational Safety and Health Act of 1973). 384 Section 18 of the Occupational Safety and Health Act of 1970 encourages States to develop and operate their own job safety and health programs, referred to informally as an OSHA State Plan. OSHA approves and monitors State plans and provides up to 50 percent of an approved plan's operating costs. 385 Department of Industrial Relations, Division of Occupational Safety and Health, California, Process Safety Management District Office. Mission Statement: Goals Reached in 2011 & Strategic Plan for 2012. 386 8 CCR §5189(p)(1) (2012).

Chevron Richmond Refinery Regulatory Report December 2013

79 DRAFT FOR PUBLIC COMMENT equipment integrity. According to the interview notes, many operators had raised issues of corrosion in the RLOP to higher level supervisors to no avail; according to one, if you raise an issue a couple of times, “you get labeled a ‘pest.’” The CSB has not identified evidence indicating that Cal/OSHA took further action to respond to these concerns, and Cal/OSHA did not issue any citations as a result of its investigation.387 Post-incident, significant sulfidation corrosion was found in the RLOP and piping and equipment were replaced. The CSB found other significant evidence that increased workforce participation could have reduced the likelihood that unchecked corrosion would lead to the August 2012 incident. As discussed in the CSB’s Interim Report on the Chevron incident, Chevron technical staff has considerable knowledge and expertise regarding sulfidation corrosion, specifically with respect to corrosion rate variations caused by differing silicon concentration in carbon steel piping. Chevron employees have authored industry papers on sulfidation corrosion and had significant influence in the development of the industry sulfidation corrosion recommended practice, API RP 939-C. In 2009, Chevron Energy Technology Company (Chevron ETC)388 created an internal document on the subject of sulfidation corrosion. Chevron ETC metallurgists released a formal report dated September 30, 2009 (nearly 3 years prior to the incident) to Chevron refinery-based reliability managers and chief inspectors entitled Updated Inspection Strategies for Preventing Sulfidation Corrosion Failures in Chevron Refineries. Sulfidation experts explained in the Chevron ETC report that, “[u]ntil now, Chevron has not directly addressed the risk of low Si[licon] carbon steel…”389 and that the ETC report introduced a program that “seeks to close these gaps, and to maximize the effectiveness of our inspection.” The report clearly indicates that Chevron understood both the potential consequence and the high likelihood of a rupture or catastrophic failure from sulfidation corrosion and calls out Chevron’s need for action. The Chevron ETC report specifically recommended that inspectors perform 100 percent component inspection on high temperature carbon steel piping susceptible to sulfidation corrosion. However, this 100 percent component inspection program was not implemented at the Richmond refinery prior to the August 6, 2012, incident. The Chevron ETC report defined a priority ranking system to help focus the inspection implementation efforts. The process conditions of the 4-sidecut pipe placed it in the highest priority for inspection. Chevron ETC technical experts issued a corporate newsletter in 2010 that again warned of the potential consequence of sulfidation failures. In this newsletter, the 100 percent component inspection recommendation from the 2009 report was reiterated for piping systems such as the crude unit 4-sidecut piping. The newsletter stated: Sulfidation corrosion failures … are of great concern because of the comparatively high likelihood of ‘blowout’ or catastrophic failure. This typically happens because corrosion occurs at a relatively uniform rate over a broad area, so a pipe can get progressively thinner until it actually bursts rather than leaking at a pit or local thin area. In addition, the

387 Post-incident, there were significant mechanical integrity improvements and piping replaced in the RLOP unit. 388 The Chevron Energy Technology Company is a separate business unit within the Chevron Corporation that provides technology solutions and technical expertise for Chevron operations worldwide. See http://richmond.chevron.com/home/aboutchevronrichmond.aspx (accessed April 4, 2013) 389 A 2003 corporate technical newsletter recommended 100 percent component inspection of carbon steel piping susceptible to sulfidation corrosion following a 2002 Chevron Salt Lake City sulfidation corrosion incident.

Chevron Richmond Refinery Regulatory Report December 2013

80 DRAFT FOR PUBLIC COMMENT process fluid is often above its auto ignition temperature. The combination of these factors means that sulfidation corrosion failures frequently result in large fires. Chevron and the industry have experienced numerous failures from this mechanism and recent incidents have reinforced the need for revised inspection strategies and a robust PMI (Positive Materials Identification) program. The Chevron ETC 100 percent component inspection recommendation for high risk piping systems, established in 2009, was not implemented at Richmond, and the thin-walled low silicon 4-sidecut piping component remained in service until it catastrophically failed on August 6, 2012. Chevron and Chevron ETC metallurgists, materials engineers, and piping inspectors had expertise regarding sulfidation corrosion. They educated personnel and advocated for identification and control of damage mechanisms, including sulfidation corrosion. However, they had limited practical influence to implement their recommendations. These individuals did not participate in the crude unit PHA and did not affect decisions concerning control of sulfidation corrosion during the crude unit turnaround process.390 Despite the history of sulfidation corrosion incidents and the recommendations by Chevron’s workforce to implement better inspection methodologies, Cal/OSHA did not evaluate these recommendations or determine whether Chevron management ensured that the hazards of this damage mechanism were addressed and mitigated in Chevron’s PHAs. In addition, Cal/OSHA issued no citations to Chevron post- incident regarding the failure to address sulfidation corrosion in its crude unit PHA. Finally, when Chevron employees raised concerns, Cal/OSHA did not effectively address them. The examples highlighted in this section speak to the need for California to develop more effective regulation similar to the UK legislation discussed in Section 4.4, to ensure strong workforce involvement in health and safety matters at petroleum refineries. This will not only help prevent incidents such as the one that occurred at Chevron, but it will also help improve communication and ensure that workers are represented in the decisions that affect them. 5.1.2.6 Funding and Regulator Competency Cal/OSHA has not received sufficient funding to employ a well-staffed, multi-disciplinary team capable of conducting thorough inspections of PSM-covered facilities in California. This is apparent when examining the lack of preventative, planned inspections of petroleum refineries being conducted by the PSM team in the state. In order for a safety regulatory regime to successfully regulate with the goal of major accident prevention, there must be a technically competent, well-resourced regulator in place to sufficiently review, scrutinize, and challenge the hazard identification and evaluation that has been conducted and controls that have been put in place to reduce risk, to help drive continuous improvement and ensure that risks are being controlled. It is not an acceptable outcome for society that petroleum refineries with the potential for catastrophic accidents be inspected only after an accident occurs or a complaint is filed.

390 The turnaround process includes both the planning stage prior to the shutdown and the activities staged during the shutdown.

Chevron Richmond Refinery Regulatory Report December 2013

81 DRAFT FOR PUBLIC COMMENT Compensation is one important factor for recruiting and retaining technically competent personnel. The CSB found that California regulators are significantly less compensated when compared to their industry counterparts. Based on information Chevron provided to the CSB, the average annual salary of refinery personnel who would interact with a California regulator performing an audit or safety inspection is $187,630. Table 2 below provides the 2012 salaries of California regulatory personnel that the CSB determined would likely perform a safety inspection or a hypothetical safety case assessment. These figures indicate a substantial compensation gap between the regulator and the regulated. A Cal/OSHA PSM team of associate safety engineers receive an average annual salary that is 46 percent lower than the refinery employees they would likely interface with during an inspection. EPA RMP inspectors receive an annual salary that is 33 percent lower than their facility counterparts and Contra Costa County accidental release prevention engineers and their supervisor are paid 48 percent less than these industry personnel.391

Entity Average Annual Salary Refinery Personnel $187,630 Cal/OSHA $100,536 Contra Costa County $96,875 EPA $125,000 Table 2. Average 2012 salary for individuals selected by the CSB as representative of the professional staff within each California regulator and of the refinery professional staff who interface with the regulators regarding audits or safety inspections at the Chevron Richmond Refinery. As noted in the introduction of this report, the California State Legislature approved a 2013-2014 state budget bill (AP 110) that allows the California Department of Industrial Relations to charge state petroleum refineries a fee by March 31, 2014, to support an increase in funding and to pay for at least 15 new positions in Cal/OSHA’s PSM Unit.392 The CSB considers this to be a positive step towards improving process safety management in the state of California, as it will provide the team the opportunity to conduct more thorough inspections. However, it is imperative that these additional inspectors have the skills, knowledge, and experience to provide sufficient direct oversight over PSM- covered facilities. Despite the additional funding, there remains a longstanding salary cap on associate safety engineers within Cal/OSHA. This will continue to make it difficult for Cal/OSHA to consistently attract or retain the necessary talent and expertise to effectively oversee these facilities.

391 Compensation information is based on salary only. It does not take into account non-salary information such as bonuses, retirement programs, or benefit programs. 392 See http://www.caltax.org/homepage/062113_Legislature_Approves.html (accessed July 9, 2013).

Chevron Richmond Refinery Regulatory Report December 2013

82 DRAFT FOR PUBLIC COMMENT 5.2 U.S. Environmental Protection Agency According to the EPA OIG, as of May 2012, only eight states and five local agencies had accepted full or partial RMP program delegation from EPA.393 As such, EPA regions directly implement the RMP program in most states. As no state agency has requested or received delegation to implement the RMP program within EPA Region 9, the federal EPA regional office is responsible for RMP program implementation for California as well as Arizona, Nevada, Hawaii, the Pacific Islands, and 148 Tribal Nations. 5.2.1 Risk Management Plan (RMP) Program As of March 2013, there were 1,137 RMP-covered facilities in Region 9: 957 in California; 118 in Arizona; 42 in Nevada; 16 in Hawaii; and four in Guam.394 The Chevron Richmond Refinery has many processes covered by the RMP rule, including Program 3 processes, 395 such as the crude unit. As such, Chevron is required to submit an RMP every five years to EPA Region 9, and EPA is expected to audit the facility against this RMP to ensure compliance. According to Chevron’s most recent RMP submitted to EPA Region 9 in October 2011, its crude unit contained 400,000 pounds of a flammable mixture of propane, pentane, butane, ethane, and methane, well above the 10,000-pound threshold quantity for flammables.396 EPA Region 9 employs four full-time and two part-time RMP inspectors to implement the RMP program for the roughly 1,100 RMP-covered facilities in the entire region. Region 9 staff informed the EPA OIG that to most effectively utilize their resources, they “place an additional focus on facilities in States, such as Arizona, that do not have their own risk management or accident prevention programs.397 The EPA’s mandates to conduct a certain number of inspections at high-risk facilities plus a lack of resources and staffing prevent the inspectors from fully auditing many of the petroleum refineries in each state; thus, the inspectors aim to visit each refinery every three years, where they pick one process to evaluate for two to three days. These inspectors target their inspections towards a specific industry issue during these visits. For example, when they last inspected Chevron in 2010, the inspectors focused on the issue of high temperature hydrogen attack (HTHA) due to the Tesoro incident398 that occurred in April 2010.

393 EPA OIG. Improvements Needed in EPA Training and Oversight for Risk Management Program Inspections; March 21, 2013; p 2. 394 US EPA Region 9 Emergency Prevention and Preparedness Program; Stanislaus County Powerpoint; March

  1. See http://www.condorearth.com/files/08-Enforcement_Priorities-Mary_Wesling.pdf (accessed May 14,

2013). 395 Processes not eligible for Program 1 and either subject to OSHA’s PSM standard or classified in one of ten specified North American Industrial Classification System (NAICS) codes are placed in Program 3, which imposes OSHA’s PSM standard as the prevention program as well as additional hazard assessment, management, and emergency response requirements. 396 EPA List of Regulated Chemicals and Threshold Quantities for RMP program available at http://www.epa.gov/R5Super/cepps/pdfs/rmp-listed-chemicals-200708.pdf (accessed May 17, 2013). 397 California has its own RMP program, called CalARP. See EPA OIG. Evaluation Report: EPA Can Improve Implementation of the Risk Management Program for Airborne Chemical Releases; February 10, 2009; p 23. 398 On April 2, 2010, a heat exchanger ruptured due to high temperature hydrogen attack, resulting in seven worker fatalities at the Tesoro Anacortes Refinery in Anacortes, Washington. The CSB is currently investigating this incident.

Chevron Richmond Refinery Regulatory Report December 2013

83 DRAFT FOR PUBLIC COMMENT 5.2.2 Implementation of the RMP Program In order for a safety regime to function well, there must be a competent, well-resourced regulator in place to implement the regime. However, the EPA Region 9 RMP group is extremely understaffed and under- resourced, as there are only six full-time inspectors to cover over 1,100 facilities across many states. Instead of fully inspecting or auditing petroleum refineries, the group is able to inspect one process at each refinery for two to three days every three years, which makes fully inspecting these facilities or auditing against the RMPs submitted by these facilities impossible. In addition, this group has other responsibilities beyond the RMP program, including the management of contracts, emergency prevention and preparedness training and outreach, and reporting violations under the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA). The CSB has learned that because this group has such limited resources, it hopes to delegate RMP inspection authority to other agencies throughout the region, as long as it maintains power to enforce violations. Like the federal and California PSM standards, the RMP regulations provide for workforce participation399 and require facilities to prepare a written plan of action regarding employee participation. It is the RMP program’s policy to invite employee representatives to participate in all parts of onsite inspections. EPA Region 9 RMP staff told the CSB, however, that the limited amount of time they were able to spend onsite at refineries made speaking with facility inspectors and operators a difficult task. They expressed that a lesson learned from the Chevron incident was that EPA RMP inspectors should commit more time onsite during facility inspections and audits, which will allow them more time to speak with workers to gain a better insight into how any issues within the facility are being addressed and resolved.400 As mentioned above, EPA guidance on the RMP program states that the owner or operator’s duty to “prevent accidents and ensure safety at [their] source…” may require steps to be taken “beyond those specified in the risk management program rule.”401 While this principle appears to be similar to ALARP requirements of the safety case, in practice this is not required, and whether this is done is not subject to regulation or review. Similar to the PSM standard, RMP regulations require each facility with Program 3 processes to conduct a PHA as part of its prevention program that is “appropriate to the complexity of the process…and[] identify, evaluate, and control the hazards involved in the process.”402 However, these regulations do not require facilities to include these analyses in the RMPs they submit to EPA. Rather, facilities with Program 2 or 3 processes are only required to include in the RMP very high-level, simplified information on their prevention programs and their PHAs. The Chevron Richmond Refinery’s most recent RMP submission from October 2011 included the following information on the PHAs for each relevant process: the date of the last PHA for that process; what technique was used; what major hazards were identified; what process controls were in use (i.e. automatic shutoffs, interlocks, alarms, emergency power); what mitigation systems were in use (i.e. dikes, fire walls, water curtain); what monitoring/detection systems were in use (i.e. process area detectors); date of the most recent review or

399 See 40 CFR §68.83 (2000). 400 This need for greater interface with worker is a professional opinion by EPA staff, but has not resulted in EPA policy modifications to ensure effective worker input in future inspections. 401 EPA Office of Solid Waste and Emergency Response. General Guidance on Risk Management Programs for Chemical Accident Prevention (40 CFR Part 68); March 2009; p 7-7. See http://www.epa.gov/osweroe1/docs/chem/Toc_final.pdf (accessed May 14, 2013). 402 40 CFR §68.67(a) (1998).

Chevron Richmond Refinery Regulatory Report December 2013

84 DRAFT FOR PUBLIC COMMENT revision of training programs; and maintenance. Chevron included one paragraph entitled “E.5. General Accidental Release Prevention Program,” which stated that PSM is applied to the entire refinery, and the PSM program is documented in Refinery Instruction (RI)-360, “Richmond Refinery PSM Policy.” No additional information or analysis could be located concerning the identification or control of hazards, or risk reduction, as, unlike the safety case model, there is no requirement for the company to demonstrate to the regulator that it is effectively ensuring that the safety systems are functioning as intended. Under the EPA RMP program, there is no regulatory requirement to reduce risks to ALARP. In addition, there is no requirement to submit to the regulator detailed information relating to risk reduction or hazard assessments. Finally, the Region 9 EPA RMP inspection team does not have the resources to fully audit petroleum refineries and other high hazard facilities subject to the RMP program. As a result, the EPA RMP program is not comprehensive or rigorous enough to control major accident hazards and reduce risks. Instead, facilities submit high-level summary information providing evidence that the activity- based requirements contained within the RMP regulations have been completed by the facility. 5.3 Unified Program Chevron’s Richmond refinery was also subject to process safety regulatory requirements at the county and city level. The facility had to adhere to additional requirements above RMP and PSM, but these requirements were not sufficient to prevent the Chevron incident. The following sections will discuss those county and city requirements. In 1993, Chapter 418, Statutes of 1993 (Senate Bill 1082) established Chapter 6.11 of the California Health and Safety Code (HSC), which required the Secretary of the California Environmental Protection Agency (Cal/EPA) to adopt regulations creating a “unified hazardous waste and hazardous materials management” regulatory program, or Unified Program, by January 1, 1996, to consolidate and make consistent six existing hazardous materials and hazardous waste programs within the state.403 The Secretary of Cal/EPA was charged with ensuring that the Unified Program was established and implemented by a Certified Unified Program Agency, or CUPA, in all counties in California. Cal/EPA adopted the Unified Program regulations under Title 27, Division 1 of the California Code of Regulations, which integrated six existing programs: the Hazardous Waste Generator and Onsite Hazardous Waste Treatment programs; the Aboveground Storage Tank program; the Underground Storage Tank program; the Hazardous Materials Release Response Plans and Inventory program; the California Accidental Release Prevention (CalARP) program; and the California Uniform Fire Code.404 The CalARP program, which was created through Assembly Bill AB1889 with the goal of major accident prevention, will be discussed at greater length below. There are currently 83 CUPAs in the state of California that implement the Unified Program at a local level.405 5.3.1.1 Contra Costa County Hazardous Materials Programs The Chevron Richmond Refinery is located in the City of Richmond, within Contra Costa County. The local CUPA responsible for implementing the Unified Program in all areas of the country is the Contra

403 California Health and Safety Code §25404(b) (1993). Also see http://www.calepa.ca.gov/cupa/Reports/2002/ReimbAcct.pdf (accessed May 16, 2013). 404 27 CCR §15100 (a)(1) through (6) (1994). 405 See http://www.calepa.ca.gov/cupa/Documents/2012/FactSheet.pdf (accessed May 16, 2013).

Chevron Richmond Refinery Regulatory Report December 2013

85 DRAFT FOR PUBLIC COMMENT Costa Health Services’ Hazardous Materials Programs (CCHMP).406 CCHMP is responsible for implementing the Unified Program in all areas of Contra Costa County. CCHMP implements two programs that are relevant to this investigation: the CalARP program and the City of Richmond Industrial Safety Ordinance (RISO). CCHMP also implements the county’s own Industrial Safety Ordinance (ISO), which covers seven facilities. CCHMP has five full-time engineers, known as accidental release prevention engineers, who are responsible for implementing these programs for the county. While all have technical degrees in engineering, only two of these engineers have past refinery experience. 5.3.1.1.1 CalARP The California Health and Safety Code Article 2 (Chapter 6.95, Sections 25531 – 25543.3) was amended effective January 1, 1997, to implement EPA’s RMP program at the state level through the creation of the CalARP program regulations. Modeled after EPA’s RMP program and California’s Risk Management and Prevention Plan, which was enacted in 1986, the CalARP regulations (Title 19, Chapter 4.5 of the CCR) were implemented with the goal of preventing accidental releases of substances that can cause serious harm to the public and the environment, minimizing damage caused by a release, and to satisfy community right-to-know laws.407 California is one of at least three states that implement a state RMP program without delegation of the federal program from EPA.408 The CalARP regulations, including PHA requirements, are essentially duplicative in nature to EPA’s RMP program, with a few exceptions: the list of toxic chemicals covered is 276 instead of 77; the threshold quantities of some chemicals are smaller; CalARP requires a seismic analysis; and there is more interaction with the public and other agencies.409 The CalARP regulations require that businesses that produce, handle, process, distribute, or store certain chemicals over a certain threshold quantity develop a Risk Management Plan (RMP) and submit the RMP to a local CUPA for review. Like the EPA RMP program, facilities with a Program 3 process must develop a management system that includes a PHA and emergency response program.410 State oversight authority and responsibility for the CalARP program is with the California Emergency Management Agency (Cal EMA).411 The CalARP regulations apply to roughly 45 facilities in Contra Costa County, including the Chevron refinery in Richmond. Each covered facility is required to submit an updated RMP to CCHMP at least once every five years.412 The group of CCHMP engineers reviews these plans and is required to

406 Contra Costa County’s Hazardous Materials program is responsible for responding to emergencies and monitoring hazardous materials in Contra Costa County. It is the duty of CCC to safeguard the Contra Costa County ecosystem from the release of hazardous materials and other pollutants. For more information see http://cchealth.org/hazmat/ (accessed May 21, 2013). 407 Information available at http://www.calema.ca.gov/HazardousMaterials/Pages/Accidental-Release-Prevention- (CalARP).aspx (accessed May 16, 2013). 408EPA OIG. Evaluation Report: EPA Can Improve Implementation of the Risk Management Program for Airborne Chemical Releases; February 10, 2009; p 20. 409 Information on differences between EPA’s RMP program and CalARP available at http://cchealth.org/hazmat/differences-rmp-calarp-iso.php (accessed May 16, 2013). 410 22 CCR §2735.5(f) (2004). 411Cal EMA is responsible for the coordination of overall state agency response to major disasters in support of local government. For more information see http://www.calema.ca.gov/Pages/default.aspx (accessed May 21, 2013). 412 22 CCR §2745.10(a)(1) (2004).

Chevron Richmond Refinery Regulatory Report December 2013

86 DRAFT FOR PUBLIC COMMENT “periodically audit RMPs”413 against the regulations to ensure compliance. This group has told the CSB that it audits each facility at least once every three years. It last audited Chevron in February 2011, and has been conducting another audit in October and November 2013. Although CCHMP is authorized to issue enforcement actions for violations uncovered during facility audits, in practice CCHMP engineers issue “ensure” action items that list the deficiencies and recommend improvements. They then work with the facility to make sure that these action items are implemented. CCHMP has rarely issued fines or citations to facilities for violations. If the engineers identify other gaps or areas for improvement that are not actual regulatory violations, they can issue “consider” action items, which are essentially suggestions to the facility for improvements that are not technically required to be implemented by the regulation. Whether these types of action items are issued is dependent upon the knowledge and experience of the engineer conducting the audit. Once CCHMP engineers have completed the audit, CCHMP issues a final audit report on the facility, which they also supply to Cal/OSHA’s PSM District Office and the EPA Region 9 RMP group. 5.3.1.1.2 Industrial Safety Ordinance The Contra Costa County Industrial Safety Ordinance (ISO) became effective January 15, 1999. Adopted as County Ordinance Chapter 450-8, the ISO expands on the CalARP program in Contra Costa County for facilities meeting the following criteria: 1) the facility is within an unincorporated area of the County; 2) the facility is either a petroleum refinery or chemical plant; 3) the facility is required to submit a Risk Management Plan (RMP) to the EPA and the Contra Costa County Health Service; and 4) the facility has at least one Program 3 process.414 Seven of the 45 CalARP facilities in the county are currently required to comply with the ISO requirements. The ISO was adopted to improve industrial safety by, among other things, requiring more comprehensive coverage of the whole facility rather than only certain processes; providing review, inspection, auditing and safety requirements more stringent than are currently in effect; requiring the development and implementation of a human factors program; and preventing and reducing the number, frequency and severity of accidental releases in Contra Costa County.415 Facilities subject to the ISO are essentially required to treat every process as subject to the CalARP Program 3 prevention program requirements. Covered facilities have additional requirements as well, including developing and implementing a human factors program, considering inherently safer technologies and systems for new and existing facilities or processes, submitting a safety plan to CCHMP, and conducting a Management of Organizational Change (MOOC) prior to changes in permanent staffing levels or reorganization in operations, maintenance, health and safety, or emergency response.416

413 22 CCR §2775.2(a) (2004). 414 See http://cchealth.org/groups/hazmat/industrial_safety_ordinance.php (accessed May 21, 2013). 415 Chapter 450-8.004(a)(1) through (10) ( 416 Information available at http://cchealth.org/groups/hazmat/industrial_safety_ordinance_risk_management.php (accessed May 22, 2013).

Chevron Richmond Refinery Regulatory Report December 2013

87 DRAFT FOR PUBLIC COMMENT 5.3.1.1.3 City of Richmond Industrial Safety Ordinance On December 18, 2001, the City of Richmond adopted an Industrial Safety Ordinance (RISO) under Municipal Code Chapter 6.43 that was almost identical to the ISO. In February 2013, the City of Richmond Council amended the RISO to make it equivalent to the ISO. Chevron is one of two facilities subject to RISO requirements. Pursuant to an agreement with the City of Richmond, CCHMP implements and enforces the RISO within the city. Like the ISO, the RISO requires that a covered facility submit a safety plan to CCHMP that includes safety elements such as process safety information (PSI), operating procedures, mechanical integrity, employee participation, and management of change (MOC).417 CCHMP has posted a Safety Plan Guidance Document on its website to assist facilities in developing these plans. Each facility is also required to comply with safety requirements including performing PHAs, and must include a description of the manner of compliance with these in the safety plan.418 In performing a PHA, facilities are required to address the hazards of the process, identify any previous incident, identify controls applicable to the hazards, and identify consequences of failure of those controls, human factors, and a qualitative evaluation of a range of possible safety and health effects of failure of controls.419 The CCHMP engineers are required to review each facility’s safety plan as well as audit each facility to determine compliance with ISO or RISO. CCHMP engineers conduct the CalARP and ISO/RISO audits concurrently at each covered facility. CCHMP generally audits each facility once every three years. To aid in the auditing process, CCHMP engineers have entered all the CalARP program requirements into a database. They have taken each of these requirements and turned them into questions. When the engineers go onsite, they perform three main functions: 1) they identify and review any policy statement that directs how people should handle a particular piece of equipment; 2) they identify and review records of procedures, such as MOCs and permits; and 3) they randomly select and interview individuals about their familiarity with various aspects of different programs. If the engineers find a regulatory deficiency, they issue an ensure action item to the facility. Once the engineers have completed their facility audit, they issue a preliminary determination to the facility. The facility has 90 days to review the draft and provide a proposed remedy with specifics on how they it fix each deficiency, and the timeline. Once the report is finalized it goes out for public comment. Following public comment, it is issued to the facility and provided to Cal/OSHA’s PSM District Office and the EPA Region 9 RMP group. 5.3.1.2 Analysis Chevron submitted its most updated safety plan to CCHMP on February 25, 2013. Section 3.12 of the plan discusses PHAs and Action Items. Under this section, Chevron lists eight objectives of its PHAs, including identifying possible failures or releases, evaluating potential consequences, and proposing recommendations that would reduce the risks. Chevron also discusses its possible justifications for declining recommendations from PHAs, including the fact that an alternative measure would be sufficient, and that the recommendation may be infeasible. There was no additional information or

417 Richmond Municipal Code Section 6.43.090 (a) (2013). 418 Ibid at Sections (a) through (e) (2013). 419 Ibid at (d) (2013).

Chevron Richmond Refinery Regulatory Report December 2013

88 DRAFT FOR PUBLIC COMMENT analysis contained in this section concerning the identification or control of hazards, or risk reduction, as there is no requirement to do so. The RISO and CalARP regulations require that PHAs list controls and possible consequences of failure of those controls, but there is no specific requirement to include evaluations of the safeguards and controls in the PHA. As CCHMP engineers are only required to audit against the regulatory requirements, they would only examine the evaluation of safeguards if such an evaluation were performed and documented in the facility’s PHAs. As noted previously, Chevron’s most recent crude unit PHA ineffectively listed qualitative safeguards for corrosion and mechanical integrity. While CCHMP engineers are able to issue “consider” action items to the facility recommending actions above and beyond regulatory requirements, CCHMP engineers did not do this regarding Chevron’s Crude Unit PHA or its evaluation of safeguards. After reviewing CCHMP’s most recent audit of Chevron, the CSB could find nothing referring to sulfidation corrosion, reduction of risk, or safeguard evaluation. While CCHMP is able to utilize these “consider” action items to encourage facilities to go above and beyond regulatory requirements to reduce risk, CCHMP engineers have stated to the CSB that they do not make sufficient use of this mechanism. Rather, they tend to audit against the existing regulatory requirements to ensure compliance. Unlike the safety case regulatory approach, which requires a reduction of risk to ALARP or equivalent, facilities covered by RISO or ISO are only required to “consider [emphasis added] the use of inherently safer systems in the development and analysis of mitigation items resulting from a process hazard analysis [PHA] and in the design and review of new processes and facilities.”420 Despite multiple internal recommendations to replace its piping due to the risk of sulfidation corrosion, Chevron failed to replace the piping prior to the incident with an inherently safer material. Again, the CSB has not found evidence that CCHMP effectively encouraged Chevron to go above and beyond regulatory requirements by utilizing inherently safer systems to reduce risk. As emphasized repeatedly in this report, a regulatory regime is only as strong as its regulators, and must employ individuals with the requisite skills, knowledge, and experience to provide sufficient oversight over facilities. In the case of CCHMP, there are only five engineers for nearly 45 facilities in the county, and only two have previous refinery experience.421 In addition, while the CCHMP is funded mostly through CUPA fees, ISO fees, and other means of cost recovery, the engineers are part of a bargaining unit and their salaries are paid through the county’s general fund, which has experienced annual budget reductions in the millions.422 This has unnecessarily resulted in a decrease in the CCHMP engineers’ salaries and has made it extremely difficult for CCHMP to fill a current position that has been open over three years because of its inability to offer competitive salaries to attract its engineers. Overall, CCHMP suffers from a lack of resources and funding, limiting its ability to hire additional highly qualified staff to oversee the petroleum refineries in Contra Costa County.

420 City of Richmond Municipal Code §6.43.050(g) (February 5, 2013). 421 Two of the other engineers have chemical plant experience and have led or participated in refinery compliance audits in the past ten years.

Chevron Richmond Refinery Regulatory Report December 2013

89 DRAFT FOR PUBLIC COMMENT 6.0 Conclusion

This report has focused on seven aspects of the safety case regulatory approach that the CSB believes differentiate it from existing US and California process safety regulations: safety responsibility on the part of the facility; reduction of risk to ALARP; adaptability; workforce involvement; the effective use of process safety indicators; regulatory oversight; and an independent, competent, well-funded regulator. These attributes together enable industry and the regulator to ensure that facilities are developing and implementing comprehensive, robust safety management systems to prevent major accidents. Implementation of the safety case regulatory regime in California for petroleum refineries will require a commitment of extensive resources to fund a regulator that has the requisite skills, knowledge, and experience to ensure petroleum refineries in the state continually assess their practices and reduce risks to ALARP. However, the CSB believes that effective implementation of this regulatory approach will achieve greater major accident prevention in California and, in the process, provide greater protection for its workers and the public. The safety case provides the adaptability necessary to keep current with improving standards and advancing technology, without requiring lengthy and often unproductive rulemaking on the part of the regulator. With the safety case regulatory regime in place, a competent regulator will independently ensure that California refineries have taken all practical measures that can be reasonably taken to reduce risks. For example, the regulator would have the ability to work with these facilities to implement recommendations and lessons learned from significant petroleum refinery incidents throughout the world without requiring extensive rulemaking or legislation, as regulators have done post-incident in the UK, Norway, and Australia. If questions remain regarding the safety case regulatory regime after reading this report, see Appendix C for additional information and discussion. The safety case regulatory regime will require a full commitment and extensive effort by the California legislature, regulators, and California petroleum refineries. However, the CSB believes that this effort is necessary to ensure that California, like other regions around the world, is effectively managing process safety and risk, and in the process, preventing major accidents such as the August 6, 2012, Chevron pipe rupture and hydrocarbon release.

Chevron Richmond Refinery Regulatory Report December 2013

90 DRAFT FOR PUBLIC COMMENT 7.0 Recommendations Pursuant to its authority under 42 U.S.C. §7412(r)(6)(C)(i) and (ii), and in the interest of promoting safer operations at California petroleum refineries and protecting workers and communities from future accidents, the CSB makes the following safety recommendations: California State Legislature, Governor of California 2012-03-I-CA-R21 Develop and implement a step-by-step plan to establish a more rigorous safety management regulatory framework for petroleum refineries in the state of California based on the principles of the “safety case” framework in use in regulatory regimes such as those in the United Kingdom, Australia, and Norway, and as described in this report, with the following minimum components: a. A case for safety written by the duty holder that includes a systematic analysis and documentation of all major hazards and effective control methods implemented to reduce those risks as low as reasonably practicable (ALARP); b. A thorough review of the safety case report by technically competent regulatory personnel that requires modifications and improvements to the document as necessary prior to acceptance; c. Audits and preventative inspections by the regulator to verify effective implementation of safety case elements; d. A risk management approach that requires analysis and effective implementation of safeguards, using the hierarchy of controls, to protect people and the environment from major accident hazards. The effectiveness of the safeguards will be demonstrated through the use of leading and lagging process safety indicators; e. Ability to adapt and implement safety requirements in response to newly identified hazards, advances in technology, lessons learned from major accidents, and improved safety codes without the need for new rule-making; f. Determines when new or improved industry standards and practices are needed and initiates programs and other activities such as forums to prompt the timely development and implementation of such standards and practices; g. Uses a tripartite model where the regulator, the company, and workers and their representatives play an equal and essential role in the direction of preventing major accidents; h. A regulatory model and accompanying guidance based on the UK’s The Safety Representatives and Safety Committees Regulations 1977 and the Health and Safety (Consultation with Employees) Regulations 1996, which set out the legal framework for the rights and responsibilities of workers and their representatives on health and safety-related matters, and the election of safety representatives and establishment of safety committees to serve health and safety-related functions. The elected representatives should have a legally recognized role that goes beyond consultation in activities such as the development of the safety case report, process hazard analysis, management of change, incident investigation, audits, and identification

Chevron Richmond Refinery Regulatory Report December 2013

91 DRAFT FOR PUBLIC COMMENT and effective control of hazards. The representatives should also have the authority to stop work that is perceived to be unsafe or that presents a serious hazard until the regulator intervenes to address the safety concern. Workforce participation practices should be documented by the duty holder and submitted to the regulator; i. Requires reporting of information to the public such as a summary of the safety case report, a list of safeguards implemented and standards utilized to reduce risk, and process safety indicators that demonstrate the effectiveness of the safeguards and management systems; j. An independent, well-funded, well-staffed, technically competent regulator; and k. A compensation system to ensure the safety case regulator has the ability to attract and retain a sufficient number of employees with the necessary skills and experience to ensure regulator technical competency. Periodically conduct a market analysis and benchmarking review to ensure the compensation system remains competitive with California petroleum refineries.

2012-03-I-CA-R22 Work with the regulator, the petroleum refining industry, labor, and other relevant stakeholders in the state of California to develop and implement a system that collects, tracks, and analyzes process safety leading and lagging indicators from operators and contractors to promote continuous safety improvements. At a minimum, this program shall: a. Require the use of leading and lagging process safety indicators to actively monitor the effectiveness of process safety management systems and safeguards for major accident prevention. Include leading and lagging indicators that are measureable, actionable, and standardized. Require that the reported data be used for continuous process safety improvement and accident prevention; b. Analyze data to identify trends and poor performers and publish annual reports with the data at facility and corporate levels; c. Require companies to publicly report required indicators annually at facility and corporate levels; d. Use process safety indicators (1) to drive continuous improvement for major accident prevention by using the data to identify industry and facility safety trends and deficiencies and (2) to determine appropriate allocation of regulator resources and inspections; and e. Be periodically updated to incorporate new learning from world-wide industry improvements in order to drive continuous major accident safety improvements in California.

Occupational Safety and Health Administration 2012-03-I-CA-R23 This report highlights significant advantages of the safety case regime over the existing Process Safety Management standard to prevent potentially catastrophic chemical accidents that are relevant to OSHA’s response to Executive Order 13650. In the development of the OSHA EO response, incorporate a written

Chevron Richmond Refinery Regulatory Report December 2013

92 DRAFT FOR PUBLIC COMMENT plan that includes the evaluation of issues raised from the findings, conclusions and recommendations in this report concerning the safety case regime.

Chevron Richmond Refinery Regulatory Report December 2013

93 DRAFT FOR PUBLIC COMMENT References

Australian Safety and Compensation Council. Major Hazard Facilities Annual Situation Report; 2004. http://www.safeworkaustralia.gov.au/sites/SWA/about/Publications/Documents/475/MHFAnSituationRe port_2004.pdf (accessed May 8, 2013).

Baker, J. The Report of the BP U.S. Refineries Independent Safety Review Panel, 2007.

Buncefield Major Incident Investigation Board. Recommendations on the design and operation of fuel storage sites; March 2007. http://www.buncefieldinvestigation.gov.uk/reports/recommendations.pdf (accessed May 21, 2013).

Center for Chemical Process Safety (CCPS). Guidelines for Developing Quantitative Safety Risk Criteria; August 2009.

Center for Chemical Process Safety (CCPS). Guidelines for Process Safety Metrics; October 2009.

Center for Chemical Process Safety (CCPS). Guidelines for Risk Based Process Safety; March 2007.

Center for Chemical Process Safety (CCPS). Inherently Safer Chemical Processes – A Life Cycle Approach; 2nd ed., December 2008.

Department of Energy. The Public Inquiry into the Piper Alpha Disaster; Presented to Parliament by the Secretary of State for Energy by Command of her Majesty; November 1990.

Dole, Elizabeth. Phillips 66 Company Houston Chemical Complex Explosion and Fire: Implications for Safety and Health in the Petrochemical Industry, A Report to the President; April 1990. http://ncsp.tamu.edu/reports/phillips/first%20part.pdf (accessed August 6, 2013).

EPA OIG. Evaluation Report: EPA Can Improve Implementation of the Risk Management Program for Airborne Chemical Releases; February 10, 2009.

EPA OIG. Improvements Needed in EPA Training and Oversight for Risk Management Program Inspections; March 21, 2013. http://www.epa.gov/oig/reports/2013/20130321-13-P-0178.pdf (accessed June 11, 2013).

GAO. Workplace Safety and Health: Multiple Challenges Lengthen OSHA’s Standard Setting; April 19,

  1. http://gao.gov/assets/600/590210.pdf (accessed June 12, 2013).

Hopkins, Andrew. Disastrous Decisions: The Human and Organisational Causes of the Gulf of Mexico Blowout; CCH Australia Limited, 2012.

Hopkins, Andrew. Lessons from Esso’s Gas Plant Explosion at Longford; Australian National University [Online].

Chevron Richmond Refinery Regulatory Report December 2013

94 DRAFT FOR PUBLIC COMMENT http://www.sirfrt.com.au/Meetings/IMRt/Southeast/IMRt%20East%2000Nov30/Andrew%20Hopkins%2 0presentation/Lonford%20talk.PDF (accessed May 8, 2013).

Hopkins, Andrew. Managing Major Hazards: The Lessons of the Moura Mine Disaster; National Library of Australia, 1999;.

Hopkins, Andrew. The Meaning of “Safety Cas”e; February 2013.

HSE. A Guide to the Offshore Installations (Safety Case) Regulations 2005: Guidance on Regulations;

  1. http://www.hse.gov.uk/pubns/priced/l30.pdf (accessed May 7, 2013).

HSE. Assessment Principles for Offshore Safety Cases (APOSC); March 2006. http://www.hse.gov.uk/offshore/aposc190306.pdf (accessed August 6, 2013).

HSE. Assessing compliance with the law in individual cases and the use of good practice; May 2003. http://www.hse.gov.uk/risk/theory/alarp2.htm (accessed June 12, 2013).

HSE. Developing process safety indicators: A step-by-step guide for chemical and major hazard industries; 2006. http://www.hse.gov.uk/pubns/books/hsg254.htm (accessed May 28, 2013).

HSE. Planning to do business in the UK offshore oil and gas industry? What you should know about health and safety; October 2011. http://www.hse.gov.uk/offshore/guidance/entrants.pdf (accessed June 5, 2013).

HSE. Play your part! How offshore workers can help improve health and safety; 2013. http://www.hse.gov.uk/pubns/indg421.pdf (accessed June 17, 2013).

Oil & Gas UK. Piper Alpha: Lessons Learnt; 2008. Process Safety Leadership Group. Safety and environmental standards for fuel storage sites; London,

  1. http://www.hse.gov.uk/comah/buncefield/fuel-storage-sites.pdf (accessed August 1, 2013).

Process Safety Leadership Group. Safety and environmental standards for fuel storage sites; London,

  1. http://www.hse.gov.uk/comah/buncefield/fuel-storage-sites.pdf (accessed August 1, 2013).

TAF Powell, SPE, UK Health & Safety Executive. US Voluntary Semp Initiative: Holy Grail or Poisoned Chalice? Proceedings of the Offshore Technology Conference, Houston, Texas, May 8-9, 1996.

The Competent Authority. Buncefield: Why did it happen? The underlying causes of the explosion and fire at the Buncefield oil storage depot, Hemel Hempstead, Hertfordshire on 11 December 2005; February 2011. http://www.hse.gov.uk/comah/buncefield/buncefield-report.pdf (accessed May 21, 2013).

Chevron Richmond Refinery Regulatory Report December 2013

95 DRAFT FOR PUBLIC COMMENT Wilson, Michael P. Refinery Safety in California: Labor, Community and Fire Agency Views; Summary Report for Office of Governor Jerry Brown, Interagency Task Force on Refinery Safety; March 27, 2013, Revised June 4, 2013. Citing Zimgast, Erst. (June 6, 2006). Selective U/W in Oil-Petro Segment: Loss Burden in Different Regions, USA vs. Rest of the World, History of Selective U/W, Cause of Losses. Technical report-DRAFT-EXTRACT. Risk Engineering Services, Swiss Re. http://www.lohp.org/projects/refinery_safety.html (accessed July 8, 2013).

Chevron Richmond Refinery Regulatory Report December 2013

96 DRAFT FOR PUBLIC COMMENT Appendix A: Significant Petroleum Refinery Incidents in 2012 1. Tank failure at the ExxonMobil refinery in Beaumont, Texas on 11 January 2. Vessel pressure excursion at the Flint Hills refinery in St. Paul, Minnesota on 22 January 3. Hydrogen Sulfide release from mechanical integrity failure at the Northern Tier Energy refinery in St. Paul, Minnesota on 26 January 4. Sulfuric acid release from a mechanical integrity failure at the ConocoPhillips refinery in Wood River, Illinois on 27 January 5. Hydrogen Sulfide release from mechanical integrity failure at the Marathon refinery in Garyville, Louisiana on 31 January 6. Hydrocarbon and hydrogen fluoride release from a mechanical integrity failure at the Flint Hills refinery in Corpus Christi, Texas on 31 January 7. Sulfur dioxide and hydrogen sulfide release following a vessel pressure excursion at the Alon refinery in Big Spring, Texas on 1 February 8. Hydrocarbon release from a vessel pressure excursion at the ConocoPhillips refinery in Belle Chasse, Louisiana on 1 February 9. Benzene release from a mechanical integrity failure at the Husky refinery in Lima, Ohio on 16 February 10. Fire at the Tesoro refinery in Salt Lake City, Utah on 17 February 11. Fire at the BP refinery in Cherry Point, Washington on 17 February 12. Tank failure at the Shell refinery in Deer Park, Texas on 22 February 13. Tank failure at the Paulsboro refinery in Paulsboro, New Jersey on 23 February 14. Fire at the Citgo refinery in Corpus Christi, Texas on 24 February 15. Hydrogen Sulfide release from a mechanical integrity failure at the Flint Hills refinery in Rosemount, Minnesota on 28 February 16. Vessel pressure excursion at the Motiva refinery in St. Charles, Louisiana on 28 February 17. Benzene release from a mechanical integrity failure at the Chalmette refinery in Chalmette, Louisiana on 28 February 18. Crude oil release from a mechanical integrity failure at the Flint Hills refinery in North Pole, Alaska on 4 March 19. Hydrogen fluoride release from a mechanical integrity failure at the Citgo refinery in Corpus Christi, Texas on 6 March 20. 1 worker was fatally injured and 2 other workers were burned at the Valero refinery in Memphis, Tennessee on 6 March 21. Fire during a hot work activity at the Tesoro refinery in Martinez, California on 7 March 22. Benzene release from a mechanical integrity failure at the Chevron refinery in Pascagoula, Mississippi on 8 March 23. Heavy oil release from a mechanical integrity failure at the Chevron refinery in Pascagoula, Mississippi on 13 March 24. Benzene release from a mechanical integrity failure at the Marathon refinery in Texas City, Texas on 14 March 25. Fire at the PBF Energy refinery in Delaware City, Delaware on 16 March 26. Hydrocarbon release from a mechanical integrity failure at the Chevron refinery in Pascagoula, Mississippi on 19 March

Chevron Richmond Refinery Regulatory Report December 2013

97 DRAFT FOR PUBLIC COMMENT 27. Hydrocarbon release from a mechanical integrity failure at the Tesoro refinery in Anacortes, Washington on 23 March 28. Hydrocarbon release from a mechanical integrity failure at the ExxonMobil refinery in Baytown, Texas on 24 March 29. Fire at the ExxonMobil refinery in Billings, Montana on 25 March 30. Hydrogen fluoride release from a mechanical integrity failure at the BP refinery in Texas City, Texas on 27 March 31. Hydrocarbon release from a mechanical integrity failure at the Total refinery in Port Arthur, Texas on 11 April 32. Fire at the ConocoPhillips refinery in Rodeo, California on 13 April 33. Hydrocarbon release from a mechanical integrity failure at the Flint Hills refinery in Corpus Christi, Texas on 16 April 34. Crane fell over and damaged utility piping at the Citgo refinery in Lemont, Illinois on 17 April 35. Hydrocarbon release from a mechanical integrity failure at the Flint Hills refinery in Corpus Christi, Texas on 19 April 36. Fire at BP refinery in Texas City, Texas on 20 April 37. Hydrocarbon release from a mechanical integrity failure at the ConocoPhillips refinery in Sweeny, Texas on 24 April 38. Fire at the Sunoco refinery in Philadelphia, Pennsylvania on 8 May 39. 4 workers injured in fire at the Sinclair refinery in Sinclair, Wyoming on 8 May 40. Hydrocarbon release from a mechanical integrity failure at the LyondellBasell refinery in Houston, Texas on 8 May 41. Fire at the Sunoco refinery in Philadelphia, Pennsylvania on 9 May 42. Fire at the Motiva refinery in Port Arthur, Texas on 12 May 43. Hydrogen sulfide release from a mechanical integrity failure at the CVR Energy refinery in Wynnewood, Oklahoma on 11 May 44. Hydrogen fluoride release from a mechanical integrity failure at the Citgo refinery in Corpus Christi, Texas on 15 May 45. Hydrogen sulfide release from a mechanical integrity failure at the Shell refinery in Deer Park, Texas on 17 May 46. Benzene and hydrogen sulfide release from a mechanical integrity failure at the Flint Hills refinery in Corpus Christi, Texas on 21 May 47. Fire at the Montana Refining Company refinery in Great Falls, Montana on 24 May 48. Hydrocarbon release from a mechanical integrity failure at the Valero refinery in Memphis, Tennessee on 25 May 49. 2 workers injured from a fire at the Sinclair refinery in Sinclair, Wyoming on 28 May 50. Propylene release from overpressure event at the PBF Energy refinery in Delaware City, Delaware on 29 May 51. Hydrocarbon release from a mechanical integrity failure at the Valery refinery in Houston, Texas on 31 May 52. Hydrogen and hydrocarbon release due to loss of containment event at the Shell refinery in Deer Park, Texas on 7 June

Chevron Richmond Refinery Regulatory Report December 2013

98 DRAFT FOR PUBLIC COMMENT 53. Hydrogen sulfide and hydrocarbon release due to flare failure at the Motiva refinery in Norco, Louisiana on 7 June 54. Fire at the Motiva refinery in Port Arthur, Texas on 9 June 55. Hydrocarbon release due to a mechanical integrity failure at the BP refinery in Texas City, Texas on 9 June 56. Fire at the ExxonMobil refinery in Torrance, California on 11 June 57. Fire at the Total refinery in Port Arthur, Texas on 13 June 58. Hydrogen sulfide release from a tank failure at the ConocoPhillips refinery in Rodeo, California on 15 June 59. Hydrocarbon release at the Shell refinery in Deer Park, Texas on 20 June 60. Fire at the BP refinery in Whiting, Indiana on 21 June 61. Hydrocarbon release due to a mechanical integrity failure at the Valero refinery in Corpus Christi, Texas on 23 June 62. Benzene release due to a mechanical integrity failure at the ExxonMobil refinery in Baton Rouge, Louisiana on 25 June 63. Benzene release due to a mechanical integrity failure at the ExxonMobil refinery in Baytown, Texas on 28 June 64. Propane release due to a mechanical integrity failure at the Valero refinery in McKee, Texas on 28 June 65. Sulfuric acid release due to a mechanical integrity failure at the Chevron refinery in El Segundo, California on 2 July 66. Hydrocarbon release due to a mechanical integrity failure at the Phillips 66 refinery in Westlake, Louisiana on 14 July 67. Fire at the Citgo refinery in Corpus Christi, Texas on 16 July 68. Fire at the Valero refinery in Meraux, Louisiana on 22 July 69. Sulfuric acid release due to a mechanical integrity failure at the Sunoco Point Breeze refinery in Philadelphia, Pennsylvania on 22 July 70. Fire at the BP refinery in Whiting, Indiana on 23 July 71. Hydrocarbon and hydrogen fluoride release due to a mechanical integrity failure at the Flint Hills refinery in Corpus Christi, Texas on 24 July 72. Fire at the HollyFrontier refinery in Tulsa, Oklahoma on 2 August 73. 8,614 lbs of hydrogen sulfide were released to the atmosphere due to a mechanical integrity failure on a compressor suction line at the Chevron refinery in Richmond, California on 2 August. 74. Hydrogen sulfide release from an overpressure event at the Valero refinery in Texas City, Texas on 5 August 75. Fire at the Sinclair refinery in Sinclair, Wyoming on 5 August 76. Fire at the Chevron refinery in Richmond, California on 6 August 77. Fire at the Shell refinery in Martinez, California on 13 August 78. Hydrogen sulfide release from a mechanical integrity failure at the Shell refinery in Martinez, California on 14 August 79. 2 workers injured from a fire at the BP refinery in Whiting, Indiana on 14 August 80. Hydrogen sulfide release due to a mechanical integrity failure at the Phillips 66 refinery in Wood River, Illinois on 22 August

Chevron Richmond Refinery Regulatory Report December 2013

99 DRAFT FOR PUBLIC COMMENT 81. Fire at the Sinclair refinery in Sinclair, Wyoming on 24 August 82. Hydrocarbon release due to a mechanical integrity failure at the LyondellBasell refinery in Houston, Texas on 25 August 83. Hydrocarbon release due to a mechanical integrity failure at the Flint Hills refinery in Corpus Christi, Texas on 26 August 84. Hydrogen sulfide and propylene release due to a mechanical integrity failure at the ExxonMobil refinery in Beaumont, Texas on 29 August 85. Fire at the Phillips 66 refinery in Rodeo, California on 29 August 86. A high pressure excursion in a vessel resulted in a hydrocarbon release with offsite consequences at the Holly refinery in Woods Cross, Utah on 30 August 87. Worker injured following a fire at the Marathon refinery in Detroit, Michigan on 5 September 88. Chemical release with offsite consequences at the Marathon refinery in Detroit, Michigan on 8 September 89. Sulfuric acid release due to a mechanical integrity failure at the Tesoro refinery in Martinez, California on 10 September 90. Carbon monoxide and hydrogen sulfide release due to a mechanical integrity failure at the ExxonMobil refinery in Baytown, Texas on 11 September 91. Hydrogen sulfide release due to a mechanical integrity failure at the Marathon refinery in Garyville, Louisiana on 11 September 92. Hydrocarbon release due to a mechanical integrity failure at the Chevron refinery in Pascagoula, Mississippi on 14 September 93. Unspecified leak at the Tesoro refinery in Martinez, California on 15 September 94. Hydrocarbon release due to a mechanical integrity failure at the PBF Energy refinery in Delaware City, Delaware on 21 September 95. Hydrogen sulfide release due to a mechanical integrity failure at the Motiva refinery in Norco, Louisiana on 24 September 96. 1 worker killed and another worker injured from an explosion at the CVR Energy refinery in Wynnewood, Oklahoma on 28 September 97. Fire at the Motiva refinery in Convent, Louisiana on 1 October 98. Hydrogen fluoride release at the Placid refinery in Port Allen, Louisiana on 1 October 99. Hydrogen sulfide release from a high pressure excursion at the Valero refinery in Port Arthur, Texas on 1 October 100. Fire at the ExxonMobil refinery in Baytown, Texas on 3 October 101. Vapor cloud release at the Hess refinery in Port Reading, New Jersey on 3 October 102. Hydrocarbon release due to a mechanical integrity failure at the Phillips 66 refinery in Rodeo, California on 8 October 103. Fire at the Citgo refinery in Corpus Christi, Texas on 9 October 104. Vapor cloud release with offsite impact from the Kern Oil refinery in Bakersfield, California on 17 October 105. Hydrocarbon and hydrogen sulfide release from a pressure excursion at the ExxonMobil refinery in Joliet, Illinois on 19 October 106. Hydrocarbon release due to a mechanical integrity failure at the Citgo refinery in Sulfur, Louisiana on 22 October

Chevron Richmond Refinery Regulatory Report December 2013

100 DRAFT FOR PUBLIC COMMENT 107. Hydrogen sulfide release at the Chalmette refinery in Chalmette, Louisiana on 23 October 108. Fire at the Tesoro refinery in Martinez, California on 21 October 109. Fire at the BP refinery in Texas City, Texas on 30 October 110. Fire at the Valero refinery in Port Arthur, Texas on 3 November 111. Benzene release due to a mechanical integrity failure at the Shell refinery in Deer Park, Texas on 8 November 112. Vapor release at the Tesoro refinery in Martinez, California on 8 November 113. Hydrogen sulfide release due to a mechanical integrity failure or a high pressure excursion at the Shell refinery in Martinez, California on 24 November 114. Hydrogen sulfide and hydrocarbon release at the Northern Tier Energy refinery in St. Paul Park, Minnesota on 27 November 115. Benzene release due to a mechanical integrity failure at the ExxonMobil refinery in Baton Rouge, Louisiana on 1 December 116. Hydrogen fluoride release that killed one worker, injured 2 other workers and 7 emergency responders at the Valero refinery in Memphis, Tennessee on 3 December 117. Hydrocarbon release due to a mechanical integrity failure at the Flint Hills refinery in Corpus Christi, Texas on 5 December 118. Hydrogen sulfide release at the Phillips 66 refinery in Wood River, Illinois on 8 December 119. Fire at the Motiva refinery in Port Arthur, Texas on 11 December 120. Benzene release due to a mechanical integrity failure at the Alon refinery in Big Spring, Texas on 11 December 121. Hydrocarbon release due to a mechanical integrity failure at the Shell refinery in Deer Park, Texas on 11 December 122. Hydrocarbon release at the Shell refinery in Anacortes, Washington on 12 December 123. Hydrogen sulfide release due to a pressure excursion at the PBF Energy refinery in Paulsboro, New Jersey on 14 December 124. Hydrocarbon and hydrogen sulfide release due to a mechanical integrity failure at the Marathon refinery in Garyville, Louisiana on 15 December 125. Fire at the Motiva refinery in Port Arthur, Texas on 17 December Note -Incidents of hydrocarbon leaks into a cooling tower or releases to a flare system are not included in the above list.

Chevron Richmond Refinery Regulatory Report December 2013

101 DRAFT FOR PUBLIC COMMENT Appendix B: Regulatory Comparison Table OSHA PSM Standard California PSM Standard The Safety Case Regulatory Regime Scope Covered processes excluding oil and gas well drilling and servicing Covered processes excluding oil and gas well drilling and servicing Applies to offshore and onshore oil and gas operations Specific PSM/ Major Accident Focus Yes Yes Yes ALARP or Equivalent No No Yes Adaptability to New or Revised Codes, Standards, Technology, Hazard Information, Lessons Learned, etc. Limited to RAGAGEP –only addresses equipment and mechanical integrity (2 of 14 elements); RAGAGEP not defined in the standard or a referenced list, only a handful of standards referenced as RAGAGEP in OSHA interpretation letters Limited to RAGAGEP – only addresses equipment and mechanical integrity; RAGAGEP not defined in the standard or a referenced list, only a handful of standards referenced as RAGAGEP in OSHA interpretation letters Yes via safety case and supporting framework legislation PSM Indicators Req. No No Yes for Companies Competent Regulator 50% or more Engineers/PSM OSHA-some progress but no Cal/OSHA – some progress but no Yes Sufficient Funding for Competent Regulatory staff OSHA-No California is increasing funding to support additional staff on Cal/OSHA PSM team Yes Hazard Analysis Required – “shall identify, evaluate, and control the hazards involved in the process.” Required – “appropriate to the complexity of the process for identifying, evaluating, and controlling hazards involved in the process.” Is a specific aspect of SC and supporting framework regulation and is required for all onshore and offshore facilities. To meet legislative goal-setting requirements, a structured risk assessment including HA as appropriate is required from all “employers.”

Chevron Richmond Refinery Regulatory Report December 2013

102 DRAFT FOR PUBLIC COMMENT Incident Investigation Requires a report but activity- based; requires including “any recommendations resulting from the investigations” (what if there are none?); system required to “resolve the incident report findings and recommendation; no explicit requirement to prevent a similar occurrence or controlling hazards. Requires a report including “any recommendations resulting from the investigation.” System required to “establish a system to promptly address and resolve the report findings and recommendations and…implement the report recommendations in a timely manner, or take action to prevent a reoccurrence.” Investigation of incidents required to demonstrate legal compliance with framework legislation. ‘Reasonably practicable’ requirement would require remedial action and cross company learning from incident investigations. HSE can require SC duty holder compliance with investigation report recommendations (e.g. Buncefield Report-“determine SIL level requirements for overfill protection”) Management of Change Activity-based; the employer “shall establish and implement written procedures to manage changes;” “the procedures shall assure the following considerations are addressed…impact of change on safety and health;” no formal hazard analysis required; no requirement that the identified safety impacts or hazards be controlled. Activity-based: the employer “shall establish and implement written procedures to manage changes…;” “the procedures shall assure that the following are addressed prior to any change…technical basis for proposed change; impact of change on safety and health;” no formal hazard analysis required; no requirement that the identified safety impacts or hazards be controlled. Description of MOC procedures and demonstrations of their effectiveness in managing major accident hazard risk are a key requirement of the safety case. Workforce Participation “Employers shall develop a written plan of action regarding the implementation of the employee participation;” Employers shall consult with employees and their representatives on the conduct and development of PHAs and the other elements of PSM in this standard.” “Employer shall develop a written plan of action to ensure employee participation in process safety management;” includes employer consultation with employees and their representatives on the conduct and development of the elements of process safety management required by this section; and providing employees and their representatives with access to all information required to be developed by this section…” Provides for the election of protected safety representative positions and safety committees.

Chevron Richmond Refinery Regulatory Report December 2013

103 DRAFT FOR PUBLIC COMMENT Inherent Safety No No Yes

Chevron Richmond Refinery Regulatory Report December 2013

104 DRAFT FOR PUBLIC COMMENT Appendix C: Frequently Asked Questions (FAQs) Regarding the Safety Case Regulatory Approach

  1. Is it true that the safety case regulatory approach leads to self-regulation by industry?

Critics of the safety case regulatory approach have noted that this type of regulatory regime is likely to result in mere industry self-regulation.423 Critics have also noted that this is at least partly due to the fact that there is no will in the US to ensure that regulators have the tools, resources, and competence to effectively regulate workplaces. The CSB and those with experience in developing and implementing the safety case regulatory regime have repeatedly stated that the purpose of the safety case regulatory approach is to ensure that all hazards have been identified, evaluated, and controlled so that risks are reduced to as low as reasonably practicable, or ALARP. In simple terms, the safety case report is a series of claims as to how an installation is being safety operated. The real strength of the safety case regulatory regime is testing the validity of those claims through strategic intervention by competent, well-funded regulators. Advanced performance-based regulatory regimes in the United Kingdom (UK) and Norway, for example,424 incorporate a list of regulator-accepted standards and good practices that provide companies with the minimum performance that is expected. Companies must demonstrate that they meet or exceed those standards. Therefore, companies are aware of minimum performance expectations they must meet as they work to reduce risks to ALARP. If a competent regulator is not in place, then the safety case report equates to nothing more than a lifeless document sitting on a shelf, and the criticism of self-regulation becomes valid.

It is also important to point out that in a letter from the USW Local 5 to the CSB dated November 22, 2013, it was stated that “[t]he current system is truly a self regulated system, with the industry setting the rules, changing the rules, and monitoring themselves.” Individuals are noting that the current system in place has actually led to self-regulation despite the intent of the PSM standard and RMP program to be performance-based.

The CSB has also noted that post-incident criminal or civil enforcement is not an effective approach to prevent major accidents; rather than accepting the inevitability of catastrophic events, we should act to prevent them from happening. This sentiment has been shared by many members of Congress in the past year following serious incidents such as the Chevron pipe failure in Richmond, California, and the West Fertilizer explosion in West, Texas. As noted in this report, there is a movement in California to improve oversight of petroleum refineries – the Cal/OSHA PSM Unit is already receiving additional funding to help increase staffing numbers. There has also been increased dialogue in the US in recent years surrounding the regulation of the oil and gas industry and how to make improvements. As such, the support exists to not only shift the current activity-based regulatory structure to a more goal-based safety

423 See e.g. Rena Steinzor. Lessons from the North Sea: Should “Safety Cases” Come to America? Vol. 38: 417; 2011; p 439. Available at http://papers.ssrn.com/sol3/papers.cfm?abstract_id=1735537 (accessed September 4, 2013). 424 Norway requires many similar aspects of a safety case regime offshore but there are differences in implementation and style and content of the regulations. The UK implements a safety case regime both onshore and offshore.

Chevron Richmond Refinery Regulatory Report December 2013

105 DRAFT FOR PUBLIC COMMENT case regulatory regime, but to also ensure that competent, well-funded regulators are in place to implement and enforce such a regime.

rulemaking under the Administrative Procedure Act? The Administrative Procedure Act, or APA, was passed in 1947, and lays out the basic framework under which federal rulemaking is conducted. It defines “rule” as “the whole or a part of an agency statement of general or particular applicability and future effect designed to implement, interpret, or prescribe law or policy or describing the organization, procedure, or practice requirements of an agency…”425 “Rulemaking” is defined as the “agency process for formulating, amending, or repealing a rule.”426 Federal agencies often impact their specific area of jurisdiction by publishing rules promulgated through notice and comment rulemaking, or informal rulemaking, under the APA. Unfortunately, as this report discusses at length, the rulemaking process in the US is a cumbersome one, and some federal agencies, such as OSHA and the EPA, are subject to additional requirements and more stringent review standards that go above and beyond those contained in the APA. To avoid these additional burdens, many agencies provide further guidance to regulated parties through more informal means, such as answering questions and issuing policy statements, guidance, or opinion letters. Another way to lessen the burden on regulating agencies and their regulated entities is to adopt performance or goal-based regulations rather than prescriptive regulations. Performance-based standards state the objective or outcome to be achieved, such as risk reduction, without describing the specific means of obtaining that objective. This provides the regulated entities with the freedom and flexibility to work to achieve a stated goal, such as reducing risks to as low as reasonably practicable, or ALARP, through their chosen and preferred means.427 Performance-based standards also provide flexibility to the regulator; for example, in a safety case regulatory regime, should the regulator determine through assessment of the safety case report and/or inspection that the facility has not reduced risks to ALARP with regard to a specific hazard, he or she may require that the facility take additional steps to further reduce risk without needing to propose and adopt a new rule or regulation to address it. The regulator must accept the safety case report in order for the facility to operate.

The Regulatory Flexibility Act (RFA) was passed in 1980 during the Carter Administration. It requires agencies to prepare and make available for public comment regulatory flexibility analyses of proposed rulemaking, and also encourages agencies to consider alternatives to rulemaking, including “the use of performance rather than design standards…”428 Executive Order 13272 then directed federal agencies to establish procedures and policies to comply with the Act.429 Federal agencies have been encouraged to adopt performance-based standards in the US for decades. Recognizing the inefficient process of federal rulemaking in the US, President Clinton signed Executive Order 12866 in September of 1993, which, among other things, directed federal agencies to “identify and assess alternative forms of

425 5 U.S.C. §551(4) (2011). 426 5 U.S.C. §551(5) (2011). 427 Such as reliance upon qualitative assessments, quantitative assessments, semi-quantitative risk assessments, and good practice guidance. 428 5 U.S.C. §603(3) (2010). 429 Exec. Order No. 13272, 67 Fed. Reg. 159 (August 13, 2002). http://www.gpo.gov/fdsys/pkg/FR-2002-08- 16/pdf/02-21056.pdf (accessed September 24, 2013).

Chevron Richmond Refinery Regulatory Report December 2013

106 DRAFT FOR PUBLIC COMMENT regulation…[and] specify performance objectives, rather than specifying the behavior or manner of compliance that regulated entities must adopt.”430 Executive Order 13563, entitled Improving Regulation and Regulatory Review, supplemented and reaffirmed Executive Order 12866 by ordering agencies to “identify and consider regulatory approaches that reduce burdens and maintain flexibility and freedom of choice for the public.”431 Its stated goal was to “protect public health, welfare, safety, and our environment while promoting economic growth, innovation, competitiveness, and job creation.”432 Its seven guiding principles are as follows:  Increase predictability and reduce uncertainty;  Use and rely on best available science;  Ensure public participation and open exchange of ideas;  Use the most innovative and least burdensome tools;  Consider cost benefit analysis (quantitative and qualitative);  Ensure regulations are publicly available, consistent, written in plain language and easy to understand; and  Measure results and seek to improve actual results.433

The safety case regime aims to satisfy all of these principles.

California has adopted its own version of the APA, known as the California Administrative Procedure Act (CAPA) (California Government Code §11340 et seq.).434 Among its many requirements for California state agencies that adopt regulations, CAPA directs them to consider the substitution of performance standards for prescriptive standards.435 CAPA defines “performance standard” as “a regulation that describes an objective with the criteria stated for achieving the objective.”436

Federal agencies that are engaged in and responsible for regulating high hazards, such as NASA and the Nuclear Regulatory Commission (NRC), have adopted goal or performance-based standards that require risks to be reduced to “as safe as reasonably practicable” (ASARP) and “as low as reasonably achievable,” (ALARA), respectively. The OSHA Process Safety Management (PSM) standard also contains performance-based elements to some extent; for example, it provides regulated entities with flexibility in how to perform a process hazard analysis (PHA). However, it contains no risk reduction goals such as ALARP. This has resulted in an activity-based regulatory scheme that emphasizes completing activities, such as a PHA or a Management of Change (MOC) analysis, rather than actual risk reduction. Without a risk reduction goal such as ALARP in place, the PSM standard will not have the ability to successfully drive continuous improvement and adaptation of industry safety management advances.

430 Exec. Order No. 12866, 48 Fed. Reg. 190 (September 30, 1993). http://www.archives.gov/federal- register/executive-orders/pdf/12866.pdf (accessed September 24, 2013). 431 Exec. Order No. 13563, 76 Fed. Reg. 14 (January 21, 2011). http://www.gpo.gov/fdsys/pkg/FR-2011-01- 21/pdf/2011-1385.pdf (accessed September 24, 2013). 432 Ibid. 433 Ibid. 434 Available at http://www.oal.ca.gov/administrative_procedure_act.htm (accessed September 18, 2013). 435 California Government Code, §11340.1(a) (1995). 436 California Government Code, §11342.570 (1995).

Chevron Richmond Refinery Regulatory Report December 2013

107 DRAFT FOR PUBLIC COMMENT

  1. Can the safety case regulatory approach work in the US when workforce involvement is emphasized

less than other regions and unionization rates are lower than other countries?

A majority of the workforce in California petroleum refineries is unionized, as the unionization rate for the 15 petroleum refineries in California is actually 73 percent,437 which is significantly higher than the 2012 rates for the US as a whole (11.1 percent), Australia (17.9 percent), the UK (25.8 percent), and Norway (54.7 percent).438 Despite a declining unionization rate in the UK, the region has developed strong onshore and offshore regulations that provide for the creation of protected safety representative positions and safety committees for unionized and non-unionized facilities. These positions are meant to create a healthier and safer workplace, and result in better decision-making regarding health and safety, increased productivity, higher workforce motivation, a stronger commitment to implementing decisions or actions (as employees have been actively involved in reaching these decisions), and greater cooperation and trust.439 The HSE has devoted extensive time and resources to ensuring employers are complying with these regulations and understand the importance and benefits of involving workers in health and safety-related matters.

The UK also has a standard establishing the minimum level of training that elected safety representatives offshore should receive to enable them to fully perform their functions as defined in the Safety Representatives and Safety Committees Regulations – SI 1989/971. This training standard, entitled the OPITO Approved Standard, was developed by an industry workgroup facilitated by OPITO.440 In June 2013, Det Norske Veritas (DNV)441 became accredited by OPITO to offer newly developed training courses to more than 2,000 elected safety representatives in the offshore industry. The training, which has been driven and supported by HSE, Oil and Gas UK, and the Offshore Industry Advisory Committee’s (OIAC’s) Workforce Involvement Group, consists of four separate Modules run over the course of eight days.442 The training covers topics such as Understanding and Identifying Major Accident Hazards and Investigating Incidents and Applying Root Cause Analysis.

The CSB recognizes HSE’s effort to improve workforce involvement through regulations, protected positions, and training, and has recommended in this report that California develop regulations and guidelines to establish similar protected safety positions to ensure effective workforce participation. The CSB believes the HSE model can also be effective in the US as these regulations require effective safety representation regardless of unionization rates.

437 In September 2013, the USW provided the CSB with a list of California petroleum refinery locations as of October 2012 and the existing unionization representation at those refineries. Of the 15 petroleum refineries operating in California as of October 2012, 11 of those were unionized, with USW providing the union representation at all 11 facilities. 438 For complete statistics on trade union density for countries around the world see http://stats.oecd.org/Index.aspx?QueryId=20167 (accessed September 5, 2013). 439 HSE. Consulting employees on health and safety: A brief guide to the law. 2013; p 2. http://www.hse.gov.uk/pubns/indg232.pdf (accessed September 5, 2013). 440 OPITO is an industry-owned non-profit that serves the needs of the oil and gas industry in the UK and around the world. See http://www.opito.com/ (accessed September 10, 2013). 441 DNV is an independent foundation headquartered in Oslo, Norway, that provides services for managing risk around the world. For more information see http://www.dnv.com/ (accessed September 10, 2013). 442 http://www.marinelink.com/news/launches-offshore355749.aspx (accessed September 10, 2013).

Chevron Richmond Refinery Regulatory Report December 2013

108 DRAFT FOR PUBLIC COMMENT

  1. Has the safety case regulatory approach resulted in fewer major accidents?

Unfortunately, there have been few objective studies conducted on the impact of the safety case regulatory approach on safety performance onshore and offshore. In 1999, a report commissioned by the HSE (“the Aberdeen Report”) which evaluated the impact of the offshore Safety Case Regulations on offshore safety was published.443 One of the purposes of the study was to review published safety data for trends in offshore accidents and incidents from 1990 until 1997.444 Upon this review, it was determined there had been a decrease in accidents since the implementation of the offshore safety case regulations in the UK, but cautioned it was difficult to distinguish the effect of the safety case regulations from other industry activities such as the level and type of exploration and production activity, oil prices, and industry-led initiatives.445 The Aberdeen Report also cautioned about the difficulties in analyzing offshore data that also hold true for the more current data presented in Figure 3. The total number of accidents and incidents recorded can be affected by industry attitudes toward reporting, changes in how and what data is reported, and the decrease or increase in offshore activity. As stated in the Aberdeen Report, “[d]espite these cautions, accident statistics play an important role in the analysis of the state of safety in any industry, since accidents represent the ‘bottom line’ in safety. It is therefore important to analyze the trends, but to also take the drawbacks into consideration.”446 As discussed in this report, the reporting and analyzing leading process safety indicators is important to gain a better understanding of how safety management systems are functioning, and thus a better idea of how well the various regimes are managing hazards and mitigating risk. Statistics from the seven years covered by the Aberdeen Report indicated an overall decrease in reported accident rates in the UK and Norwegian databases up until 1994. From 1994 to 1997, both the UK and Norway reported a slight increase in the number of reported accidents.447 Norway did report a drop in 1997 from 1996. The decrease reported up until 1994 for the UK appeared to be independent of the offshore production activities as those levels had been on the increase during the same time period. Drilling in the UK decreased during the same time frame, making the cause for the decrease in reported drilling accidents unclear. More recent reviews of accident data indicate decreasing trends in accident statistics. The Presidential Oil Spill Commission noted the following in its report to the President on the Macondo disaster:

[f]rom 2004 to 2009, fatalities in the offshore oil and gas industry were more than four times higher per person-hours worked in U.S. waters than in European waters, even though many of the same companies work in both venues. This striking statistical discrepancy reinforces the view that the problem is not an inherent trait of the business itself, but rather

443 Evaluation of the Offshore Safety Legislative Regime—A study undertaken by AUPEC Ltd. For the Safety Policy Division, Health & Safety Executive, Ref: 8938/3714, June 1999. 444 Ibid at Ch 7. 445 Ibid at Ch 7, p 7-1. 446 Ibid at Ch. 7, p 7-11. 447 This was based on the number of accidents per million man hours for the two Continental Shelves (Ibid, Figure 7.8)

Chevron Richmond Refinery Regulatory Report December 2013

109 DRAFT FOR PUBLIC COMMENT depends on the differing cultures and regulatory systems under which members of the industry operate.448

In September 2013, Det Norske Veritas (DNV)449 released a position paper discussing necessary improvements to reduce risk of major offshore accidents, and noted in the report that “there are no good globally accepted metrics for major accident hazards…”450 However, DNV was able to point to UK HSE’s Hydrocarbon Releases Database System (HCR)451 in the North Sea to provide an example of improving safety performance trends.452 The HRC contains detailed voluntary information of over 4,000 hydrocarbon releases offshore from close to 300 installations since 1992. The HRC data, plotted in Figure 3, show the total number of releases to be on the decline. Classifying the severity of a release is based on agreed-upon criteria with the offshore industry.453 The UK has defined significant events to be those that, if ignited, have the potential to cause a major accident where multiple casualties could occur. The occurrence of any hydrocarbon release is undesirable because of the potential to escalate, and so reporting data from minor incidents has also been included in Figure 3 below.

Figure 3. Hydrocarbon releases in the North Sea reported to UK HSE as dangerous occurrences under the Reporting of Injuries, Diseases and Dangerous Occurrences Regulations.454

448 National Commission on the BP Deepwater Horizon Oil Spill. Deep Water: The Gulf Oil Disaster and the Future of Offshore Drilling. Report to the President; January 2011; Ch 8 p 225. 449 DNV is an independent foundation headquartered in Oslo, Norway, that provides services for managing risk around the world. For more information see http://www.dnv.com/ (accessed September 10, 2013). 450 DNV. Enhancing offshore safety and environmental performance: Key levers to further reduce the risk of major offshore accidents. 2013; p 5. http://www.dnv.com/industry/oil_gas/services_solutions/offshore_safety.asp (accessed September 10, 2013). 451 https://www.hse.gov.uk/hcr3/ 452 In its position paper, DNV cited data from 1996, but UK HSE has noted that the criteria for severity classification was refined in 1999 so data since that date is presented here. 453 Hydrocarbon Releases System Internet Help File, https://www.hse.gov.uk/hcr3/help/help_public.asp (accesses September 10, 2013) 454 RIDDOR – Reporting of Injuries, Diseases and Dangerous Occurrences Regulations 1995 became effective offshore on April 1, 1996, http://www.hse.gov.uk/riddor/ (accessed September 10, 2013) 0 50 100 150 200 250 Reported Releases Financial Year (April‐March)  2000/01 to 2012/13 Minor Significant Major Total

Chevron Richmond Refinery Regulatory Report December 2013

110 DRAFT FOR PUBLIC COMMENT It is important to note that major accidents are low-probability, high-consequence events, and as such they are difficult to measure. According to Dr. Andrew Hopkins, major accidents are more difficult to define than, say, a car accident, and they are rare, making it difficult to estimate the number of major accidents prevented.455 In addition, based on the data in existence, there is a continued need for improved data collection; key leading performance indicators development and implementation on a global scale would provide an improved glimpse into how safety is being managed for major accident prevention.

safety critical equipment, poor understanding of the potential impact of degrading plant and utility systems on safety critical elements, and lack of understanding of the role of asset integrity and the concept of barriers in major hazard risk control. Don’t these reports developed by the UK regulator demonstrate that the safety case is not effective and is not working? The CSB recognizes that there have been critiques of the safety case regime and its implementation. The CSB acknowledges that the safety case is not perfect and that no regulatory system will be perfect in its implementation. Some have noted the issue of aging equipment due to many issues, including the harsh conditions that exist in the North Sea. Regulators and commissions in the UK have found degradation of pipes, valves, and other equipment at many facilities due to company deferrals of maintenance, insufficient testing of safety-critical elements, and a continuing industry culture of responding to disasters, rather than anticipating worst-case scenarios. However, the safety case regime’s adaptive nature has been able to address these concerns. The HSE has recognized asset integrity management and the issue of ageing equipment as key issues to address in its inspection programs, and has developed internal processes and priorities for these areas. In 2010, the UK HSE initiated Key Programme 4 to address the issue of aging equipment offshore and the operation of installations beyond their design life.457 The same year, the HSE published a report intended to inform industry and aid in the prevention of major accidents entitled Managing Ageing Plant: A Summary Guide,458 which provides an overview of ageing plant mechanisms and their management and presents the findings of an analysis of loss of containment incidents to indicate the extent to which ageing plant equipment may be a factor. This type of programmatic proactive approach and information dissemination is lacking in the US both on and offshore. 455 Hopkins, Andrew. The Cost-Benefit Hurdle for Safety Case Regulation: A discussion paper prepared for the US Chemical Safety Board. Add Date, Page, and Link. 456 The HSE published a report to communicate the results and conclusions of the Asset Integrity Key Programme carried out between 2004 and 2007 by the Health and Safety Executive’s Offshore Division. See http://www.hse.gov.uk/offshore/kp3.pdf, (accessed August 28, 2013). 457 The report is available at http://www.hse.gov.uk/offshore/ageing/kp4-interim-report.pdf (accessed November 1, 2013). 458 See http://www.hse.gov.uk/research/rrpdf/rr823-summary-guide.pdf (accessed November, 1, 2013).

Chevron Richmond Refinery Regulatory Report December 2013

111 DRAFT FOR PUBLIC COMMENT

  1. How have other countries implemented the safety case regime? What challenges do the countries face

when transitioning to a safety case approach?

From the international safety case community, the CSB has found that when transitioning to a safety case regime there are many obstacles that may hinder the transition, such as:

 Major stakeholders not being committed to the process, unconvinced of the need;  Lack of understanding that the safety case regime is a “process” to be undertaken by the duty holder and the workforce to improve understanding of the hazards, risks, and their controls, and to put in place measures for continuous improvement, rather than just creation of a “document”;  Lack of sufficient funding by government and industry; and  Lack of the necessary legislative timetable.

The transition to a safety case regime has significant challenges for both the duty holder and the regulator, including:

 The safety case report could be treated as a check-the-box exercise;  Documented safety management system does not reflect reality;  Poor identification of hazards and risks;  Poor understanding of the performance of control systems;  Attempting to justify existing controls rather than to seek opportunity to improve;  Insufficient workforce involvement in the process;  The safety case process is under-resourced;  The safety case report is “inaccessible” so the report simply lives on the shelf;  The regulator does not use the safety case report to inform the inspection or audit;  Limited requirement for the reporting of accidents, dangerous occurrences and precursors resulting in lack of comprehensive performance data; and  The regulator is under-resourced, technically challenged, poorly trained, has poor systems and procedures, and is inconsistent.

In implementing the safety case regime, there should be regard for the regulatory principles and frameworks which represent best practice. The underlying principles are:

 The legislation and regulation should be fit for purpose, not simply superimposed on existing prescriptive regulation;  Regulation should be effective and efficient; and  Industry should move away from a culture of compliance with detailed prescriptive regulation to one of involving the workforce in understanding the hazards.

Some significant points worth noting from international experience in setting up the regulation are:

 Staff should be recruited against detailed job descriptions and should cover the full range of technical, management and regulatory requirements;

Chevron Richmond Refinery Regulatory Report December 2013

112 DRAFT FOR PUBLIC COMMENT  Pay rates and terms and conditions should be sufficient to attract highly qualified staff;  A competency framework needs to be developed reflecting the required knowledge, skills, and experience required to undertake;  Appropriate training programs must be in place;  An electronic dedicated safety case assessment procedure which captures the detail of the process to be followed and records the background to the decision-making process will be needed. This helps ensure good quality, consistent, and transparent assessment and provides a database of information which is used for future validation/topic facility inspections. It also provides a comprehensive record of the process which can be used in the event of an appeal against an assessment decision;  An accident and dangerous occurrence data base will be needed to store knowledge and data to provide reference information and the capacity to analyze trends; and  An emergency reporting and response process is necessary to ensure all significant events are properly logged and dealt with.

Chevron Richmond Refinery Regulatory Report December 2013

113 DRAFT FOR PUBLIC COMMENT

FD06452 | 2012_美国_Chevron Richmond 炼油厂 火灾 - Chevron Richmond Refinery Fire__最终报告_5.pdf

分类:06_境外及港澳台调查报告 | 年份:2012 | 地域: | 严重程度: | 场所:化工/石化 | 起火原因: | 来源格式:pdf

U.S. CHEMICAL SAFETY AND HAZARD INVESTIGATION BOARD

REGULATORY REPORT

CHEVRON RICHMOND REFINERY PIPE RUPTURE AND FIRE

CHEVRON RICHMOND REFINERY #4 CRUDE UNIT RICHMOND, CALIFORNIA AUGUST 6, 2012

REPORT NO. 2012-03-I-CA OCTOBER 2014

Chevron Richmond Refinery Regulatory Report October 2014

[This page left intentionally blank.]

2

Chevron Richmond Refinery Regulatory Report October 2014

Table of Contents Table of Contents .......................................................................................................................................... 3 Acronyms and Abbreviations ....................................................................................................................... 5 1.0 Executive Summary ......................................................................................................................... 7 1.1 Incident Summary ............................................................................................................................ 7 1.2 Interim Report .................................................................................................................................. 7 1.3 Background ...................................................................................................................................... 9 1.4 Key Findings .................................................................................................................................. 10 1.5 Regulatory Conclusions ................................................................................................................. 12 1.6 Recommendations .......................................................................................................................... 13 2.0 Introduction .................................................................................................................................... 14 3.0 The Safety Case Regulatory Regime ............................................................................................. 21 3.1 Introduction .................................................................................................................................... 21 3.2 Initial Safety Case Implementation ................................................................................................ 22 3.2.1 United Kingdom .................................................................................................................... 22 3.2.1.1 Onshore .......................................................................................................................... 22 3.2.1.2 Offshore ......................................................................................................................... 25 3.2.2 Global Analysis of Safety Case Implementation .................................................................. 27 3.2.2.1 Australia ........................................................................................................................ 27 3.2.2.1.1 Offshore ................................................................................................................. 27 3.2.2.1.2 Onshore .................................................................................................................. 28 3.2.2.2 Norway .......................................................................................................................... 29 3.2.2.3 The United States........................................................................................................... 30 3.2.2.3.1 OSHA PSM Standard ............................................................................................ 31 3.2.2.3.2 U.S. Environmental Protection Agency Risk Management Program .................... 33 3.2.2.3.3 Safety Case in the United States ............................................................................ 35 4.0 Key Features of an Effective Safety Case Regulatory Regime ...................................................... 37 4.1 Duty Holder Safety Responsibility, including a Written Case for Safety ...................................... 38 4.2 Continuous Risk Reduction to ALARP ......................................................................................... 40 4.3 Adaptability and Continuous Improvement ................................................................................... 44 4.4 Active Workforce Participation ..................................................................................................... 53 4.5 Process Safety Indicators that Drive Performance ......................................................................... 58 3

Chevron Richmond Refinery Regulatory Report October 2014

  1. 6 Regulatory Assessment, Verification, and Intervention ................................................................ 62
  2. 7 Independent, Competent, Well-Funded Regulator ........................................................................ 66
  3. 0

Oversight of Petroleum Refineries in California ........................................................................... 70 5.1 Cal/OSHA ...................................................................................................................................... 70 5.1.1 Background Information ....................................................................................................... 70 5.1.2 Analysis ................................................................................................................................. 76 5.1.2.1 ALARP .......................................................................................................................... 76 5.1.2.2 Adaptability and Continuous Improvement ................................................................... 78 5.1.2.3 Process Safety Indicators ............................................................................................... 80 5.1.2.4 Inspections ..................................................................................................................... 80 5.1.2.5 Workforce Participation ................................................................................................ 81 5.1.2.6 Funding and Regulator Competency ............................................................................. 83 5.2 U.S. Environmental Protection Agency ......................................................................................... 85 5.2.1 Risk Management Plan (RMP) Program ............................................................................... 85 5.2.2 Implementation of the RMP Program ................................................................................... 86 5.3 Unified Program ............................................................................................................................ 87 5.3.1.1 Contra Costa County Hazardous Materials Programs ................................................... 87 5.3.1.1.1 CalARP .................................................................................................................. 88 5.3.1.1.2 Industrial Safety Ordinance ................................................................................... 89 5.3.1.1.3 City of Richmond Industrial Safety Ordinance ..................................................... 90 5.3.1.2 Analysis ......................................................................................................................... 90 6.0 Conclusion ..................................................................................................................................... 92 7.0 Process Safety Management Reform at the Federal Level: A Path Forward ................................ 93 8.0 Recommendations .......................................................................................................................... 96 References ................................................................................................................................................. 100 Appendix A: Significant Petroleum Refinery Incidents in 2012 ............................................................. 103 Appendix B: Regulatory Comparison Table ............................................................................................ 108 Appendix C: Frequently Asked Questions (FAQs) Regarding the Safety Case Regulatory Approach ... 111 Appendix D: CSB Staff May 2014 Response to the Board’s Motion to Postpone issued on January 15, 2014 .......................................................................................................................................................... 121

4

Chevron Richmond Refinery Regulatory Report October 2014

Acronyms and Abbreviations ALARA

As Low As Reasonably Achievable ALARP

As Low As Reasonably Practicable ALJ

Administrative Law Judge ANPRM

Advance Notice of Proposed Rulemaking APA

Administrative Procedure Act API

American Petroleum Institute ASARP

As Safe As Reasonably Practicable BSEE

Bureau of Safety and Environmental Enforcement CA

Competent Authority CAA

Clean Air Act CAAA

Clean Air Act Amendments CalARP

California Accidental Release Prevention Cal/EPA

California Environmental Protection Agency Cal/OSHA

California Division of Occupational Safety and Health CAPA

California Administrative Procedure Act CCHMP

Contra Costa Health Services’ Hazardous Materials Program CCPS

Center for Chemical Process Safety CCR

California Code of Regulations CERCLA Comprehensive Environmental Response, Compensation, and Liability Act CFR

Code of Federal Regulations Chevron ETC Chevron Energy Technology Company CIMAH

Control of Industrial Major Accident Hazards COMAH

Control of Major Accidents Hazards Regulations CSB

U.S. Chemical Safety and Hazard Investigation Board CSHO

Compliance Safety and Health Officer CUPA

Certified Unified Program Agency DIR

California Department of Industrial Relations DNV

Det Norske Veritas EA

Environment Agency EPA

U.S. Environmental Protection Agency FSA

Formal Safety Assessment FY

Fiscal Year GAO

U.S. Government Accountability Office HSC

California Health and Safety Code HSE

Health and Safety Executive HTHA

High Temperature Hydrogen Attack ISO

Industrial Safety Ordinance 5

Chevron Richmond Refinery Regulatory Report October 2014

ISOM

Isomerization LOHP

Labor Occupational Health Program MOC

Management of Change MOOC

Management of Organizational Change NASA

National Aeronautics and Space Administration NDU

Naphtha Desulfurization Unit NEP

National Emphasis Program NOHSC

Australia National Occupational Health and Safety Commission NOPSEMA Australian National Offshore Petroleum Safety and Environmental Management Authority NPRM Notice of Proposed Rulemaking NRC U.S. Nuclear Regulatory Commission OERI Operational Excellence and Reliability Intelligence OIG Office of Inspector General OMB Office of Management and Budget OSHA

U.S. Occupational Safety and Health Administration OSHAct

Occupational Safety and Health Act PHA

Process Hazard Analysis PHMSA Department of Transportation, Pipeline and Hazardous Materials Safety Administration PQV Program Quality Verification PSA Petroleum Safety Authority PSI Process Safety Information PSLA Petroleum Submerged Lands Act PSLG Process Safety Leadership Group PSM Process Safety Management QRA Quantitative Risk Assessment RAGAGEP Recognized and Generally Accepted Good Engineering Practices RFI Request for Information RISC Risk-Informed Safety Case RISO City of Richmond Industrial Safety Ordinance RLOP Richmond Lube Oil Plant RMP Risk Management Plan RP Recommended Practice SEPA Scottish Environmental Protection Agency SFAIRP So Far As Is Reasonably Practicable SOP Standard Operating Procedure UK

United Kingdom USCG

U.S. Coast Guard USW

United Steelworkers Union 6

Chevron Richmond Refinery Regulatory Report October 2014

  1. 0 Executive Summary
  2. 1

Incident Summary On August 6, 2012, the Chevron U.S.A. Inc. Refinery in Richmond, California, (“the Chevron Richmond Refinery”) experienced a catastrophic pipe failure in the #4 Crude Unit (“the crude unit”). The pipe, a 52- inch long carbon steel piping component of the #4 sidecut line, ruptured and released flammable, hydrocarbon process fluid, which partially vaporized into a large vapor cloud that engulfed 19 Chevron employees and ignited. All of the employees escaped, narrowly avoiding serious injury. The ignition of the flammable portion of the vapor cloud and subsequent continued burning of the hydrocarbon process fluid resulted in a large plume of particulates and vapor traveling across the Richmond, California area. Approximately 15,000 people from the surrounding area sought medical treatment due to the release. 1.2 Interim Report The CSB released an Interim Report on the Chevron incident in April 2013 (“the Interim Report”), which highlighted technical findings and safety system deficiencies. Testing conducted on the ruptured pipe determined that it had experienced extreme thinning near the rupture location due to sulfidation corrosion.1 Sulfidation corrosion is a damage mechanism that causes thinning in iron-containing materials, such as steel, due to the reaction between sulfur compounds and iron at temperatures ranging from 450 °F to 800 °F.2 This damage mechanism3 causes pipe walls to gradually thin over time, and is common in crude oil distillation4 where naturally occurring sulfur and sulfur compounds found in crude oil feed, such as hydrogen sulfide,5 are available to react with steel piping and equipment. The Interim Report stated that virtually all crude oil feeds contain sulfur compounds and, as a result, sulfidation corrosion is a damage mechanism present at every refinery that processes crude oil. Sulfidation corrosion can cause thinning to the point of pipe failure when not properly monitored and controlled.

The Interim Report noted a number of causal safety system deficiencies that highlight regulatory gaps relating to major accident prevention at California petroleum refineries. For example, in conducting its process hazard analysis6 (PHA) of the crude unit, which was required under California’s Process Safety 1 With respect to the sulfidation corrosion damage mechanism that caused the Chevron incident, carbon steel piping corrodes at a rate that is significantly faster than other materials of construction, such as high chromium steels, including stainless steel. 2 For an electronic copy of the CSB Chevron Interim Report see http://www.csb.gov/assets/1/19/Chevron_Interim_Report_Final_2013-04-17.pdf (accessed October 24. 2013). 3 Piping damage mechanisms are any type of deterioration encountered in the refining and chemical process industry that can result in flaws/defects that can affect the integrity of piping (e.g. corrosion, cracking, erosion, dents, and other mechanical, physical or chemical impacts). See API 570. "Piping Inspection Code: In-Service Inspection, Rating, Repair, and Alteration of Piping Systems." 3rd ed., Section 3.1.1.5, November 2009. 4 Distillation separates mixtures into broad categories of its components by heating the mixture in a distillation column where different products boil off and are recovered at different temperatures. See http://www.eia.gov/todayinenergy/detail.cfm?id=6970 (accessed April 4, 2013). 5 Hydrogen sulfide is the most aggressive sulfur compound that causes sulfidation corrosion. 6 A process hazard analysis (PHA) is a hazard evaluation to identify, evaluate, and control the hazards of a process. Facilities that process a threshold quantity of hazardous materials, such as the Chevron Richmond refinery, are required to conduct a process hazard analysis per the California Code of Regulations Title 8 Section 5189, Process 7

Chevron Richmond Refinery Regulatory Report October 2014

Management (PSM) standard,7 Chevron did not conduct a rigorous review of corrosion and damage mechanisms present in the crude unit, and did not identify sulfidation corrosion as a hazard. As such, Chevron did not effectively address inherent safety8 or implement effective controls to prevent sulfidation corrosion, including those controls proposed by Chevron’s technical group. Although both the California and federal PSM standards require that hazards be identified, evaluated, and controlled, there is no further discussion of how far to reduce risks, and there is no requirement to address the effectiveness of controls or to use the hierarchy of controls.9 Therefore, this type of analysis was not required to be conducted, and Chevron was never cited post-incident for failing to evaluate the effectiveness of safeguards.

In another example, despite internal recommendations to replace the entire #4 sidecut piping with an inherently safer, more corrosion-resistant material of construction through the Management of Change (MOC) process, incident investigations, technical reports, and employee recommendations, Chevron repeatedly failed to implement those proposed recommendations. Chevron’s 2006 MOC analysis limited application of those recommendations to only a small section of the pipe. As a result, the portion of the pipe that failed on the August 6th incident remained in service until the incident. As there is no requirement to implement effective recommendations or control hazards under the MOC element, it is essentially an activity-based requirement. Chevron was not cited for narrowing the scope of the MOC, despite its disregard of internal recommendations. The CSB concluded in its Interim Report that Chevron did not regularly or rigorously apply inherently safer technology, which provides an opportunity for preventing major accidents, in its PHAs, MOCs, incident investigation recommendations, or during turnarounds.

The CSB made safety recommendations in the Interim Report to a number of entities, including the California State Legislature, the U.S. Environmental Protection Agency, and Contra Costa County. The Board recommended that the California State Legislature require California petroleum refineries to perform damage mechanism hazard reviews, to identify and report leading and lagging process safety indicators, to document recognized methodologies, rationale, and conclusions used to claim that safeguards intended to control hazards will be effective, and to document their inherently safer systems analysis and the hierarchy of controls in establishing safeguards for process hazards, with the goal of driving risk of major accidents to as low as reasonably practicable, or ALARP. These concepts, introduced in the Interim Report and highlighted in the recommendations, are the basic building blocks for the implementation of the safety case regime, a regulatory scheme that will be discussed in great detail in the following report.

The CSB concluded its Interim Report by highlighting additional issues that were still under investigation, including emergency planning and reporting, emergency response, safety culture, and regulatory oversight of petroleum refineries in California. The following report fulfills the CSB’s Safety Management of Acutely Hazardous Materials (1992). PHAs are also required by the California Accidental Release Prevention Program and the federal EPA Risk Management Program. 7 Under 8 CCR §5189 (e). https://www.dir.ca.gov/title8/5189.html (accessed September 25, 2013). 8 According to the Center for Chemical Process Safety (CCPS), “inherently safer design solutions eliminate or mitigate the hazard by using materials and process conditions that are less hazardous.” Center for Chemical Process Safety (CCPS). Inherently Safer Chemical Processes – A Life Cycle Approach. 2nd ed., Section 5.1.1, 2009. 9 An effectiveness ranking of techniques used to control hazards and the risk they represent can be described as a hierarchy of controls. The further up the hierarchy, the more effective the risk reduction achieved. 8

Chevron Richmond Refinery Regulatory Report October 2014

commitment to examine whether the implementation of the safety case regulatory regime could be a more effective regulatory tool to achieve major accident prevention for California petroleum refineries. The reader will find additional issues, arguments, and counterarguments regarding the safety case regulatory regime addressed in Appendix C of this report. 1.3 Background Although both the federal and California PSM standards, respectively, were intended to be goal-setting or performance-based,10,11 in practice they appear to function primarily as reactive and activity-based12 regulatory schemes that require extensive rulemaking to modify. As a result, the federal and California PSM standards have become static in the face of advancing best practices and technology, with the emphasis placed on the completion of a task or activity rather than achievement of continuous risk reduction.13 Many regions around the world such as the United Kingdom (UK), Australia, and Norway have acknowledged similar deficiencies and have implemented regulatory regimes consisting of both prescriptive14 and goal-setting elements that require duty holders15 to demonstrate to the regulator through rigorous reviews and audits that they have reduced risks to as low as reasonably practicable, or ALARP. This is referred to as the safety case regulatory regime.16 The safety case regulatory regime is a rigorous prescriptive and goal-setting regulatory approach applied globally both onshore and offshore. It is highlighted by its adaptability and requirements for continuous improvement in risk reduction for high hazard industrial facilities. A written case for safety, known as the safety case report, is generated by the duty holder and is generally rigorously reviewed, audited, and enforced by highly technically competent inspectors with skill sets familiar to those employed by the industries they oversee. Despite this global shift, the US has persisted in the use of a more activity-based regulatory scheme that lacks the ability to adapt to advancing technology and recently developed industry standards, and which has failed to adequately engage companies and their employees in continuous improvement and risk reduction with similarly-skilled inspectors. 10 Also referred to as performance-based regulations, goal-setting regulatory requirements and acceptance criteria are specified and industry must document that their specific solutions meet such requirements, e.g. in terms of acceptable risk levels. 11 See Preamble to Process Safety Management of Highly Hazardous Chemicals; Explosives and Blasting Agents. Section III. Summary and Explanation of the Final Rule (March 4, 1992). https://www.osha.gov/pls/oshaweb/owadisp.show_document?p_table=PREAMBLES&p_id=1041 (accessed August 13, 2013). 12 Activity-based standards and regulations require the mere completion of an activity and do not focus on the effectiveness of major accident prevention or risk reduction. 13 As will be discussed below, certain sections of the PSM standard have elements of a performance-based regulatory approach. 14 A prescriptive regulation or standard describes the specific means or activity-based actions to be taken for hazard abatement and compliance. Performance or goal-based regulations, on the other hand, state the objective to be obtained (such as risk reduction or hazard abatement) without describing the specific means of obtaining that objective. 15 Duty holders are considered to be “those who create and/or have the greatest control of the risks associated with a particular activity. Those who create the risks at the workplace are responsible for controlling them.” HSE. Planning to do business in the UK offshore oil and gas industry? What you should know about health and safety; October 2011; p 2. These entities may include operators, contractors, and subcontractors. http://www.hse.gov.uk/offshore/guidance/entrants.pdf (accessed June 5, 2013). 16 Norway’s offshore regulatory regime is not referred to as the safety case regime, but it does contain many of the same elements as the safety case regime, with some differences in style, substances, and implementation. 9

Chevron Richmond Refinery Regulatory Report October 2014

  1. 4

Key Findings Technical

In the ten years prior to the incident, highly knowledgeable and experienced Chevron technical staff repeatedly recommended that inspectors perform 100 percent component inspections on high temperature carbon steel piping susceptible to sulfidation corrosion. These recommendations were not implemented by Chevron management.17

Chevron technical staff recommended implementing inherently safer designs through the MOC process, incident investigations, technical reports, and past recommendations from employees. However, Chevron failed to implement proposed inherently safer recommendations prior to the incident. For example, an inspection recommendation to upgrade piping to 9-Chrome was made, but the MOC to implement the recommendation narrowed the scope, allowing the 52-inch component that failed to remain in service.

In January 2007, a failure due to sulfidation corrosion caused a fire in the Chevron Richmond Refinery crude unit, initiating a shelter-in-place for the surrounding community. A carbon steel piping spool18 failed catastrophically during operation. Chevron informed Contra Costa Health Services’ Hazardous Materials Program19 in a letter that the crude unit piping metallurgy had been upgraded following this incident as an inherently safer solution. However, this upgrade was limited to only the immediate piping spool that had failed. The inherently safer, more corrosion resistant metallurgy was not implemented more broadly in the crude unit as a result of this incident.

Chevron and Chevron Energy Technology Company metallurgists, materials engineers, and piping inspectors had expertise regarding sulfidation corrosion. However, they had limited practical influence to implement their recommendations. They did not participate in the most recent crude unit PHA, and they did not affect decisions concerning control of sulfidation corrosion during the crude unit turnaround process.20

The 2009 crude unit PHA did not identify corrosion as a potential cause of a leak or rupture in piping. The PHA cited non-specific, judgment-based qualitative safeguards to reduce risk, such as: utilizing metallurgy to minimize corrosion, having effective maintenance and inspection programs, and providing pipe wall corrosion allowances.21 The effectiveness of these safeguards was neither evaluated nor 17 These recommendations are discussed in detail in paragraphs 44 through 51 of the Chevron Interim Report. 18 A piping spool is a small, removable section of piping. In some cases, a piping spool is installed or removed in order to provide a temporary connection or complete disconnection between two piping circuits. 19 Contra Costa Health Services’ Hazardous Materials program is designed to respond to emergencies and monitor hazardous materials within Contra Costa County. See http://cchealth.org/hazmat/ (accessed April 17, 2013). 20 The turnaround process includes both the planning stage prior to the shutdown and the activities staged during the shutdown. 21 Corrosion allowance refers to extra wall thickness added as a safety factor to the design of a piece of equipment beyond that needed solely for mechanical considerations such as design temperature and pressure. This extra thickness is provided to accommodate for expected loss of wall thickness due to corrosion over the life of the equipment. 10

Chevron Richmond Refinery Regulatory Report October 2014

documented; instead the safeguards were merely listed in the PHA. Had the adequacy of these safeguards been verified, improved safeguards intended to protect against sulfidation-induced failure of carbon steel piping could have been recommended.

Regulatory

Following the August 6th incident, California’s Division of Occupational Safety and Health (Cal/OSHA) inspected the Chevron facility and issued citations. Only one citation was related to PHAs; and it was not associated with evaluating the effectiveness of safeguards. Rather, the emphasis was that Chevron’s PHA did not adequately account for hazards caused by other units associated with the crude unit. Had the California PSM standard required documentation of the effectiveness of safeguards, Chevron would have been obligated to conduct this analysis.

There is a significant discrepancy in the compensation between the California regulators and the Chevron Richmond Refinery personnel they interact with. The California regulators also lack the technical staff with the necessary skills, knowledge, and experience to provide sufficient direct oversight of petroleum refineries in California.

The CSB has examined records that demonstrate a considerable problem with significant and deadly incidents at petroleum refineries over the last decade. The EPA has noted 234 recordable accidents at petroleum refineries between 2000 and 2010. This is more than any other industry despite the fact that the nation’s petroleum refineries make up only roughly one percent of the some 13,000 facilities covered by the EPA’s Risk Management Program. In 2007, OSHA stated that according to its IMIS (Integrated Management Information System) database, since May 1992, 36 fatality/catastrophe (FAT/CAT) incidents related to HHC releases in the refining industry occurred. These incidents included 52 employee deaths and 250 employee injuries, 98 of these injuries required hospitalization. This number surpassed the combined total of the next three highest industries over the same period. In 2010, an OSHA official testified to a Congressional Subcommittee that over 20 major incidents resulting in injuries or fatalities across the country occurred between 2005 and 2010, including the Tesoro Anacortes explosion and fire in Washington. These incidents all repeated a lesson that should have already been learned by the industry. Finally, in 2012 alone, the CSB tracked 125 significant process safety incidents at US petroleum refineries. Seventeen of these took place in California.

Under the existing regulatory regimes for onshore petroleum refineries in the US and California, such as the PSM and RMP programs, there is no requirement to reduce risks to ALARP. For example, under both PSM and RMP an employer must “control” hazards when conducting a process hazard analysis (PHA) of a covered process. However, there is no requirement to address the effectiveness of the controls or the hierarchy of controls. Thus, a PHA that meets the regulatory requirements may inadequately identify or mitigate major hazard risk. In addition, there is no requirement to submit PHAs to the regulator, and the regulator is not responsible for assessing the quality of the PHA or the proposed safeguards.

11

Chevron Richmond Refinery Regulatory Report October 2014

The PSM standard does not effectively establish goals to prevent accidents or reduce risk. Only two of the 14 elements (PHA and mechanical integrity) of the PSM standard contain some goal-setting component.

In the last decade, the CSB has made a number of process-safety related recommendations to OSHA and EPA in its investigation reports and studies (e.g. Motiva, BP Texas City, and Reactive Hazards). However, none of the regulatory recommendations have been implemented, and there have been no substantive changes made to the PSM and RMP regulations to improve the prevention of major accidents.

Available data from Norway and the United Kingdom (UK) shows a reduction in hydrocarbon releases offshore under the safety case regulatory regime.22

Regulatory approaches similar to the safety case regulatory regime, which require risk reduction to ALARP or equivalent, have been implemented in the nuclear sector by the Nuclear Regulatory Commission (NRC) and the aerospace sector by NASA.

Independent studies of the safety case regulatory regime in the UK have identified improvements to safety performance from the safety case and a variety of stakeholders, including major oil companies, have shown support of the safety case.23

  1. 5

Regulatory Conclusions The existing regulatory regimes for onshore petroleum refineries in the US and California:

Rely on a safety and environmental management system framework that is primarily activity-based rather than requiring goal-based risk reduction to as low as reasonably practicable (ALARP) or equivalent.

Are static, unable to adapt to innovation and advances in the management of major hazard risks.

Do not require that companies effectively manage the risks they create; nor do they require regulator evaluation of the effectiveness of safeguards or regulator acceptance of companies’ plans for controlling those risks.

Do not ensure continuous improvement by effectively incorporating lessons learned from major accidents; nor do they require companies to address newly-identified safety issues as a result of such incidents.

Do not effectively collect or promote industry use of major accident performance indicators to drive industry to reduce risks to ALARP.

22 Norway’s indicator data is discussed in Section 4.5. The UK data is discussed in Appendix C. 23 See Sections 2.0, 3.2.1.2, and 3.2.2.3. Also see FAQ 4. 12

Chevron Richmond Refinery Regulatory Report October 2014

Do not require the use or implementation of inherently safer systems analysis or hierarchy of controls.

Do not effectively involve the workforce in risk reduction and prevention of major accidents.

Do not provide the regulator with the authority to accept or reject a company’s hazard analysis, risk assessment, or proposed safeguards; and

Do not employ the requisite number of staff with the technical skills, knowledge, and experience to provide sufficient direct safety oversight of petroleum refineries.

  1. 6

Recommendations As a result of the findings and conclusions of this report, the CSB makes recommendations, summarized below, to the state of California:

California State Legislature, Governor of California

Enhance and restructure California’s process safety management (PSM) regulations for petroleum refineries by including the goal-setting attributes identified in this report for petroleum refineries in the state of California.

Mayor and City Council, City of Richmond, California

Establish or cause to be established a compensation system to ensure regulator capability in process safety oversight and policy development in Richmond, California.

Board of Supervisors Contra Costa County, California

Establish a compensation system to ensure regulator capability in process safety oversight and policy development in Contra Costa County, California.

Section 8.0 details the recommendations. 13

Chevron Richmond Refinery Regulatory Report October 2014

  1. 0 Introduction

Despite the fact that the nation’s roughly 150 petroleum refineries represent only a small fraction of the thousands of industrial and chemical facilities that exist in the US, the CSB has seen a great number of serious and deadly incidents at refineries over the last decade.

In March 2005, the BP Texas City Refinery suffered one of the worst industrial accidents in recent US history, when overfill of a distillation column resulted in an explosion and fire that led to 15 fatalities, another 180 injuries, and the issuance of a shelter-in-place order that required 43,000 people to remain indoors. Houses were damaged as far as three-quarters of a mile away from the refinery. In a 2006 statement, former CSB Chairwoman Carolyn Merritt said that while BP did make some safety improvements before the March 2005 explosion, “the focus of many of these initiatives was on improving procedural compliance and reducing occupational injury rates, while catastrophic safety risks remained….”24

In November 2009, an explosion at the Silver Eagle Refinery damaged over 100 homes in a nearby subdivision in Woods Cross, Utah. At a public meeting to discuss the incident, former CSB Chairman John Bresland called on refineries to improve their safety performance, stating:

The frequency of accidents in US refineries is very troubling. These accidents cost lives, inflict serious injuries and can harm communities. They also earn scrutiny from government regulators; in the past few weeks a refinery in Texas drew the largest OSHA fine in history, more than US $80 million, for alleged process safety violations. I call on all refineries to redouble their commitment to safer operations and safer communities. The current rate of accidents in refineries is not sustainable and it is not acceptable.25 On the five-year anniversary of the BP Texas City explosion in March 2010, Chairman Bresland continued to relay his concern regarding refinery safety, noting that “refinery accidents…continue to occur with dismaying frequency…[and] will only stop when every refinery has made the financial and human commitment to sound process safety management.”26 Yet just ten days later, seven workers were fatally injured at the Tesoro refinery in Anacortes, Washington, following the catastrophic failure of a heat exchanger. Again, Chairman Bresland pointed out the alarming frequency of refinery incidents, stating that “if the aviation industry had the same number and types of incidents as the refining industry, I don’t think people would be flying too much.”27 24 Scrutiny Finds BP Safety Troubles. http://usatoday30.usatoday.com/money/industries/energy/2006-10-30-bp- blast-findings_x.htm (accessed September 5, 2013). 25US Refineries Commitment to Safety Called Into Question. http://www.engineerlive.com/content/22354 (accessed September 5, 2013). 26 http://www.csb.gov/statement-from-csb-chairman-john-bresland-on-5th-anniversary-of-fatal-bp-texas-city-2005- explosion/?pg=18 (accessed September 5, 2013). 27Refinery Tragedies All Too Common. See http://seattletimes.com/html/localnews/2011518449_safetysunday04m.html (accessed September 5, 2013) 14

Chevron Richmond Refinery Regulatory Report October 2014

On June 10, 2010, OSHA Deputy Assistant Secretary Jordan Barab testified before the Senate Committee on Health, Education, Labor and Pensions’ Subcommittee on Employment and Workplace Safety regarding worker safety in US energy production industries. Mr. Barab noted that OSHA had counted over 20 major incidents resulting in injuries or fatalities across the country that had occurred within the last five years, including the Tesoro Anacortes explosion and fire in Washington. These incidents all repeated a lesson that should have already been learned by the industry.28 According to Mr. Barab, “[t]his cycle of workers being hurt or killed because their employers failed to implement well-known safety measures points out major deficiencies in chemical process safety management in the nation’s refineries and, quite possibly, to systemic safety and health problems in the entire petrochemical industry.”29 According to OSHA’s compliance instruction document CPL-03-00-00430 on the OSHA Petroleum Process Safety Management National Emphasis Program (NEP) issued in 2007, Since the PSM standard was promulgated by OSHA in 1992, no other industry sector has had as many fatal or catastrophic incidents related to the release of HHC [highly hazardous chemicals] as the petroleum refining industry []. According to OSHA's IMIS [Integrated Management Information System] database, since May 1992, 36 fatality/catastrophe (FAT/CAT) incidents related to HHC releases in the refining industry have occurred. These incidents included 52 employee deaths and 250 employee injuries, 98 of these injuries required hospitalization. The number of refinery FAT/CAT incidents surpasses the combined total of the next three highest industries over the same period (SIC 2899 Chemical Manufacturing, Not Elsewhere Classified (NEC) – 12 FAT/CATs; SIC 2869 Industrial Organic Chemical Manufacturing, NEC – 12 FAT/CATs; and SIC 2892 Explosive Manufacturing – 11 FAT/CATs).31 In 2012 alone, the CSB tracked 125 significant32 process safety incidents at US petroleum refineries, which are listed in Appendix A. Seventeen of these took place in California, including a major release of 8,614 pounds of highly toxic hydrogen sulfide at the Chevron Richmond Refinery on August 2, 2012, just four days prior to the incident. Of the 14 major accidents that the CSB is currently investigating, five occurred in petroleum refineries. These include two separate explosions at the Silver Eagle refinery in Woods Cross, Utah, which resulted in injuries and offsite consequences, and a series of equipment failures at CITGO’s refinery in Corpus Christi, Texas, involving highly toxic hydrogen fluoride. In May 2014, the CSB released its final 28 Jordan Barab’s Congressional testimony is available at http://www.dol.gov/ocia/congressionaltestimony/20100610_JBarab.htm (accessed January 7, 2014). 29 Ibid. 30 OSHA Instruction CPL 03-00-004. Petroleum Refinery Process Safety Management National Emphasis Program. June 7, 2007. https://www.osha.gov/pls/oshaweb/owadisp.show_document?p_table=DIRECTIVES&p_id=3589#VIII (accessed January 7, 2014). 31 Ibid at Section VIII. 32 These incidents were reported to the Department of Energy and/or the National Response Center and examined by the CSB’s Incident Screening Department. The CSB believes that incidents that result in disruptions to the national energy supply, serious injuries, or receive high media attention are all significant. 15

Chevron Richmond Refinery Regulatory Report October 2014

investigation report on the heat exchanger rupture at the Tesoro refinery in Anacortes, Washington, which resulted in seven fatalities. The U.S. Environmental Protection Agency (EPA) has also documented 234 recordable accidents at petroleum refineries between 2000 and 2010. Despite the fact that the nation’s petroleum refineries make up only roughly one percent of the some 13,000 facilities covered by the EPA’s Risk Management Program, they accounted for more incidents in that time period than any other industry, including the much larger sector of chemical manufacturing, which EPA documented as having 218 recordable accidents.33

The CSB concludes that the continuing occurrence of refinery accidents demonstrates the pressing need to examine the current regulatory structure in place in the US and, in light of the Chevron incident, in the state of California for petroleum refineries. There have been a number of positive developments in the wake of the Chevron incident that demonstrate California’s prime opportunity to lead the nation in implementing changes to improve safety and health in the refining industry. In the Fall of 2012 following the Chevron incident, California Governor Jerry Brown created the California Interagency Working Group on Refinery Safety (“the working group”), charged with improving cooperation among agencies, including the EPA, Cal EPA, California’s Division of Occupational Safety and Health (Cal/OSHA), and Contra Costa County, with the goal of improving safety at California’s petroleum refineries and preventing major accidents.

The working group began its initiative by commissioning the Labor Occupational Health Program34 (LOHP) to conduct “listening panels” throughout California, enabling community members to meet with working group members to discuss their concerns surrounding refineries. LOHP convened a series of meetings and conference calls with labor unions, community-based organizations, fire agencies, and environmental health groups between November 6, 2012, and March 18, 2013. Dr. Michael P. Wilson, the former Director of LOHP,35 documented his findings and recommendations regarding refinery safety in a summary report entitled Refinery Safety in California: Labor, Community and Fire Agency Views, which was released on June 4, 2013.36 In the report, Dr. Wilson quoted Swiss Re’s finding that the US has experienced financial losses from refinery incidents that are three times that of industry counterparts in countries within the “EU cluster,”37 a gap which continues to grow due in part to the US refining industry’s “pushing…mode of operation”, its “compliance-driven focus on safety”, and “a ‘detached’ workforce….”38 33 Matthiessen, Craig. EPA Risk Management Program: An Overview of the EPA Risk Management Program and Inherently Safer Processes. NAS-MIC Bayer Public Meeting Power Point Presentation; May 24, 2011; p 20. 34 LOHP is a public service program for the Center for Occupational and Environmental Health at UC Berkeley’s School of Public Health. LOHP seeks “to reduce occupational injury, illness and death by protecting the health and safety of workers worldwide.” For more information, see http://www.lohp.org/ (accessed July 8, 2013). 35 Dr. Wilson now serves as Chief Scientist in the Office of the Director, California Department of Industrial Relations (DIR). DIR oversees state programs dedicated to protecting the health, safety, and economic security of California’s workers. 36 Dr. Wilson released an initial draft of the summary report on March 27, 2013. He then released a revised copy of the summary report on June 4, 2013. See http://www.lohp.org/projects/refinery_safety.html (accessed July 8, 2013). 37 The countries in the EU cluster are all of Europe, Singapore, South Korea, Japan, Saudi Arabia, Gulf States and Egypt. 38 Wilson, Michael P. Refinery Safety in California: Labor, Community and Fire Agency Views; Summary Report for Office of Governor Jerry Brown, Interagency Task Force on Refinery Safety; March 27, 2013, Revised June 4, 2013; pp 5 and 6. Citing Zirngast, Ernst. (June 6, 2006). Selective U/W in Oil-Petro Segment: Loss Burden in Different Regions, USA vs. Rest of the World, History of Selective U/W, Cause of Losses. Technical report-DRAFT- 16

Chevron Richmond Refinery Regulatory Report October 2014

Dr. Wilson reiterated a number of the findings contained in the CSB’s Interim Report on the Chevron incident, including the “striking lack of attention on the part of the Richmond Chevron refinery to maintenance and metallurgy upgrades…,” and the Chevron Richmond Refinery’s failure to implement a recommended 100% component inspection program for high-risk piping. He also stated that California’s refineries are able to operate without demonstrating competence in health, safety, and environmental performance to a regulatory agency or to the public, and as such recommended that California establish a regulatory approach similar to that of the safety case regulatory regime, a rigorous prescriptive39 and goal-setting40 regulatory regime used widely by other regions throughout the world such as the United Kingdom (UK) and Australia to regulate high hazard industrial facilities. It is highlighted by its adaptability and requirements for continuous improvements in risk reduction, places the duty on industry to demonstrate its competence in health and safety to the regulator. The regime is overseen by highly competent, well-funded regulators that rigorously audit facilities for compliance with the written safety case report and good industry practice.

On July 11, 2013, the working group released a draft report entitled Improving Public and Worker Safety at Oil Refineries,41 which the CSB has recognized as an important step forward in improving petroleum refinery safety and environmental performance both in California and nationally. The report outlined the process of adopting several of the CSB‘s recommendations from its Interim Report on the Chevron incident, including requiring refineries to implement inherently safer systems and conduct damage mechanism hazard reviews. Furthermore, the report announced the creation of an Interagency Refinery Task Force within the California Environmental Protection Agency (Cal/EPA) by September 1, 2013, aimed at facilitating information sharing and improving coordination of oversight and enforcement activities among regulatory agencies. The CSB welcomed the report’s recommendation for California to study the safety case regulatory approach.

In addition to the work being done by the working group, the California State Legislature approved a 2013-2014 state budget bill (AP 110) that allows the California Department of Industrial Relations to charge state petroleum refineries a “fee” by March 31, 2014, to help pay for at least 15 new positions in Cal/OSHA’s Process Safety Unit, which enforces the California Process Safety Management (PSM) standard throughout the state.42

The Chevron incident also spurred the formation of the City of Richmond’s Refinery Action Collaborative (“the collaborative”), which was launched on January 30, 2013. The collaborative, whose EXTRACT. Risk Engineering Services, Swiss Re. http://coeh.berkeley.edu/people/apers_educ/docs/LOHPRefinery%20Safety.pdf (accessed December 30, 2013). 39 A prescriptive regulation or standard describes the specific means or activity-based actions to be taken for hazard abatement and compliance. Performance or goal-based regulations, on the other hand, state the objective to be obtained (such as risk reduction or hazard abatement) without describing the specific means of obtaining that objective. 40 Also referred to as performance-based regulations, goal-setting regulatory requirements and acceptance criteria are specified and industry must document that their specific solutions meet such requirements, e.g. in terms of acceptable risk levels. 41 See http://www.calepa.ca.gov/Publications/Reports/2013/Refineries.PDF (accessed September 25, 2013). 42 See http://www.caltax.org/homepage/062113_Legislature_Approves.html (accessed July 9, 2013). 17

Chevron Richmond Refinery Regulatory Report October 2014

members include the United Steelworkers43 (USW) Local 5, the USW International, Communities for a Better Environment,44 and LOHP,45 was launched after a preliminary exploratory meeting held in October

  1. The collaborative advocates for community and worker safety, better transparency, and

environmental health, and has already made recommendations to the working group to improve emissions reporting and require more thorough assessments of pipe corrosion damage at oil refineries.46

On October 10, 2013, the collaborative formally responded in a memo to the July 2013 draft report issued by the Interagency Working Group on Refinery Safety (Improving Public and Worker Safety at Oil Refineries). In the memo, the collaborative stated its support for the working group’s findings and recommendations. The collaborative also issued its own recommendations and highlighted 12 principles as being important to the development of effective regulatory policy in California. These principles include linking regulatory non-compliance to an operator’s license to operate and integrating meaningful participation in decision-making by workers and communities.47 The collaborative also noted in the memo that it supported “shifting the ‘burden of proof’ of safety from public agencies to the industry, as is required in the ‘Safety Case’ approach….”48

The CSB noted in its Chevron Interim Report the important role of transparency between industry and the public in improving health and safety for the facility and the surrounding communities. Following the Chevron incident the collaborative, worker representatives, regulators, and governmental bodies played a key role in driving transparency, accountability, and improved risk reduction during the decision-making process related to crude unit piping repairs. The CSB recommended to the California State Legislature in the Interim Report to establish a multi-agency process safety regulatory program for all California petroleum refineries to further improve public accountability and transparency by establishing a system to report to the regulator methodologies, findings, conclusions, and corrective actions related to refinery mechanical integrity inspection and repair work arising from California petroleum refinery PHAs, turnarounds, and maintenance-related shutdowns.49 This system would require reporting of information such as damage mechanism hazard reviews, establish procedures for greater workforce and public participation, and provide mechanisms for federal, state, and local agency operational coordination, 43 The USW is the largest industrial union in North America and has approximately 1.2 million active and retired members in the US, Canada, and the Caribbean. For more information see http://www.usw.org/ (accessed July 17, 2013). 44 Communities for a Better Environment is an “environmental justice organization[s]” in California which has the mission of “build[ing] people’s power in California’s communities of color and low income communities to achieve environmental health and justice by preventing and reducing pollution and building green, health and sustainable communities and environments.” See http://www.cbecal.org/about/mission-vision/ (accessed August 14, 2013). 45 Other members of the collaborative include the BlueGreen Alliance (a coalition of labor unions and environmental groups that advocate for a green economy and safer workplaces), the National Resources Defense Council, and the Asian Pacific Environmental Network. 46 See http://richmondconfidential.org/2013/02/20/labor-and-environmental-groups-join-forces-on-refinery-issues/ (accessed July 9, 2013). 47 Refinery Action Collaborative. Initial Response of the Collaborative to the Findings & Recommendations of The July 2013 Draft Report of the Interagency Working Group on Refinery Safety, Governor Jerry Brown. October 10, 2013; p 10. 48 Ibid at 7. 49 Under the existing federal and California state PSM standards, this information is not currently made publicly available. 18

Chevron Richmond Refinery Regulatory Report October 2014

sharing of data, and joint accident prevention activities. California is actively working to implement this recommendation through the creation of the Interagency Refinery Task Force mentioned above.

It is also important to note that a growing dialogue has emerged throughout the US surrounding the need to improve the regulation of hazardous materials and processes, to which the CSB has been an important contributor. The CSB first examined the safety case in its 2002 investigation report entitled Improving Reactive Hazard Management50 as a potentially effective alternative framework for the regulation of reactive hazards. The CSB noted that successful implementation of this “comprehensive” regulatory approach required a competent and experienced regulator. In December 2010, the CSB held a public hearing in Washington, DC on the Regulatory Approaches to Offshore Oil and Gas Safety, where internationally recognized experts in industrial safety and accident analysis provided important testimony on managing risks offshore.51 Much of this testimony supported the implementation of the safety case as a model for regulating major hazards, both onshore and off. For example, a Shell Oil Company representative testified that the company had been using the safety case globally since 2002, and noted that the most valuable aspect of that type of regulatory regime was the need to demonstrate that major hazards have been managed using effective barriers52 and controls. In July 2012, the CSB held an additional public hearing on Safety Performance Indicators.53 A number of international regulators testified on the regulator’s ability under the safety case to drive continuous improvement in the oil and gas industry. Finally, on July 25, 2013, the CSB held a public meeting to discuss the U.S. Occupational Safety and Health Administration’s (OSHA’s) failure to implement a number of key CSB safety recommendations made to OSHA in the last decade to revise and improve its Process Safety Management (PSM) standard and to issue a new combustible dust standard.

On January 18, 2011, President Obama issued Executive Order 13563,54 which called for improvements in the nation’s regulatory system to promote predictability and reduce uncertainty and to use the best, most innovative, and least burdensome tools for achieving regulatory ends. Specifically, it directed that agencies review existing and proposed standards and regulations to ensure they effectively protect “public health, welfare, safety, and our environment while promoting economic growth, innovation, competitiveness, and job creation.”55 Finally, the order emphasized that to the extent feasible, regulations and standards should specify performance objectives rather than the behavior or manner of compliance that regulated entities must adopt, and be adopted through a process that involves public participation. As a result of this Executive Order, OSHA, the Bureau of Safety and Environmental Enforcement (BSEE), the EPA, the Department of Transportation’s Pipeline and Hazardous Materials Safety Administration 50 A full copy of the report is available at http://www.csb.gov/improving-reactive-hazard-management/ (accessed July 10, 2013). 51 For a copy of the transcript from the CSB Public Hearing on the Regulatory Approaches to Offshore Oil and Gas Safety, see http://www.csb.gov/assets/1/19/Transcript_of_Public_Meeting_12_15_2010.pdf (accessed August 14, 2013). 52 A barrier is a “technical, operational and/or organizational element[] which individually or collectively reduce[s] opportunities for specific error, hazard or accident to occur, or which limits its harm/drawbacks.” Petroleum Safety Authority. Safety Status & Signals, 2012-2012; 2013; p 31. 53 For the proceedings of the CSB Public Hearing on Safety Performance Indicators see http://www.csb.gov/events/csb-public-hearing-safety-performance-indicators/ (accessed August 14, 2013). 54 Improving Regulation and Regulatory Review. Exec. Order No. 13563, 76 Fed. Reg. 14 (January 21, 2011). http://www.archives.gov/federal-register/executive-orders/2011.html (accessed July 10, 2013). 55 Ibid. 19

Chevron Richmond Refinery Regulatory Report October 2014

(PHMSA), and the U.S. Coast Guard (USCG) solicited views from the public and stakeholders regarding opportunities to address improving efficiency and effectiveness of safety and environmental regulations and standards in the oil and gas industry.56 These five agencies then convened an expert forum57 in September 2012 in Texas City, Texas, to explore the benefits of implementing goal or performance-based regulatory models such as the safety case in the oil and gas industry, and ways to advance the use of such models in the US. The forum included a discussion of the safety case regulatory regime as a performance-based regulatory model, and industrial safety and accident analysis expert Dr. Andrew Hopkins spoke in support of that model.

In the wake of the April 2013 explosion and fire that occurred at a fertilizer storage and distribution facility in West, Texas, and resulted in fifteen fatalities and hundreds of injuries, President Obama issued Executive Order 1365058 on August 1, 2013. The Executive Order established the Chemical Facility Safety and Security Working Group, a working group of federal agencies59 tasked with, among other things, developing options for enhancing and modernizing policies, regulations, and standards to improve the safety and security of chemical facilities.60 As will be discussed in Section 4.3, the group has included the safety case regulatory model in a list of potential actions it may consider taking to improve chemical safety regulation.61

The CSB has utilized a broad range of expert testimony and research to gain a comprehensive understanding of regulatory models for onshore and offshore oil and gas facilities in countries around the world, and, in light of this investigation, the state of California. This report highlights the significant attributes of the safety case regime that together result in a more effective regulatory approach to process safety and risk reduction. It also provides a detailed contrast of the safety case regulatory model to the existing regulatory structures in the US and California, and makes recommendations to improve California’s regulatory oversight of its petroleum refineries and to promote a broader national dialogue on the safety case regulatory approach.

56 For more information see https://www.osha.gov/pls/oshaweb/owadisp.show_document?p_table=FEDERAL_REGISTER&p_id=23267 (accessed July 10, 2013). 57 See https://www.osha.gov/pls/oshaweb/owadisp.show_document?p_table=FEDERAL_REGISTER&p_id=23267 (accessed August 13, 2013). 58 Improving Chemical Facility Safety and Security. Exec. Order No. 13650, 78 Fed. Reg. 48029 (August 1, 2013). https://www.federalregister.gov/articles/2013/08/07/2013-19220/improving-chemical-facility-safety-and-security (accessed January 7, 2014). 59 The working group includes the EPA, the Department of Justice, the Department of Agriculture, the Department of Transportation, and the Department of Labor. 60 See Section 6 of the Executive Order. 61 See Working Group response to Executive Order 13650, Section 6(a) – Solicitation of Public Input on Options for Policy, Regulation, and Standards Modernization. https://www.osha.gov/chemicalexecutiveorder/Section_6ai_Options_List.html (accessed January 7, 2014). 20

Chevron Richmond Refinery Regulatory Report October 2014

  1. 0 The Safety Case Regulatory Regime
  2. 1

Introduction Throughout modern history, major industrial accidents have been catalysts for significant regulatory reform, as countries around the world strive to mitigate risk and improve the safety of their facilities and processes in order to protect human health and the environment. According to industrial safety and accident analysis expert Dr. Andrew Hopkins, “[d]isasters…offer an unparalleled opportunity to study the workings of an organisation and to identify where things are going wrong.”62 Around the world, many of these large-scale incidents have resulted in sweeping changes to legislation surrounding industrial safety and health. These changes replace prescriptive, compliance-based regulations with goal-setting regulations supplemented by prescriptive requirements that support adaptability, require duty holders63 to demonstrate to the regulator that they have driven risks to as low as reasonably practicable (ALARP) or equivalent, and provide the regulator with the tools to drive continuous improvement among major hazard facilities.64 A majority of these regulatory regimes are referred to as the safety case, which Dr. Hopkins defines as: a case which the operator of a hazardous facility makes to the regulator, setting out how safety is to be managed. It must include details of the hazard identification process, the hazards which have been identified and the procedures which have been set in place to control them. The system remains self-regulatory in principle but rather than the facility being left to its own devices by the regulator it must convince the regulator that its strategy for managing safety is satisfactory [emphasis added]. Under any safety case regime, facility operators are expected to adopt best practice risk management.65 The safety case regulatory regime is much more than a written report; it shifts risk management responsibility to the company and its employees and provides for rigorous review and oversight by a technically competent regulator to ensure effective implementation.66 62 Hopkins, Andrew. Managing Major Hazards: The Lessons of the Moura Mine Disaster; National Library of Australia, 1999; p 1. 63 Duty holders are considered to be “those who create and/or have the greatest control of the risks associated with a particular activity. Those who create the risks at the workplace are responsible for controlling them.” HSE. Planning to do business in the UK offshore oil and gas industry? What you should know about health and safety; October 2011; p 2. These entities may include operators, contractors, and subcontractors. http://www.hse.gov.uk/offshore/guidance/entrants.pdf (accessed June 5, 2013). 64 Major hazard facilities are workplaces that store, handle or process large quantities of hazardous material. Incidents at such facilities have the potential to cause serious damage to employees, people in surrounding areas, and the environment. See http://www.pc.gov.au/__data/assets/pdf_file/0018/82350/21-appendixd.pdf (accessed May 9, 2013). 65 Hopkins, Andrew. Lessons from Esso’s Gas Plant Explosion at Longford; Australian National University [Online]; p 7. http://www.sirfrt.com.au/Meetings/IMRt/Southeast/IMRt%20East%2000Nov30/Andrew%20Hopkins%20presentati on/Lonford%20talk.PDF (accessed May 8, 2013). 66 The CSB notes that that the burden is currently on the PSM regulator to verify compliance with existing regulations, which is primarily done following an incident or complaint. Rarely is this done proactively under the 21

Chevron Richmond Refinery Regulatory Report October 2014

The remaining portions of Section 3 will introduce major accidents that have occurred around the world and discuss the history behind the global development and implementation of the safety case regulatory approach on and offshore. Section 4.0 will then highlight major attributes of the safety case regulatory approach. The US regulatory model will also be introduced and discussed throughout these sections to allow for comparisons between the different approaches. Finally, Section 5.0 will discuss the regulation of petroleum refineries in California specifically, including Chevron. The report concludes with important recommendations focused on improving the regulatory oversight of California’s 14 refineries, and encouraging OSHA, industry, labor, and others to work together to improve the regulation of petroleum refineries throughout the US. 3.2 Initial Safety Case Implementation 3.2.1 United Kingdom 3.2.1.1 Onshore Two major onshore incidents in the 1970s helped spark legislative reform focused on major accident prevention and risk reduction for onshore major hazard facilities. A large dioxin67 release in Seveso, Italy, in 1976, which injured hundreds of individuals, led the European Commission68 to adopt legislation in 1982 known as the Seveso Directive, aimed at the prevention and control of major industrial accidents.69 Following the 1984 toxic release in Bhopal, India, which resulted in several thousand known fatalities, and the Sandoz chemical plant fire near Basel, Switzerland, which injured 14 individuals and released nearly 30 tons of pesticides into the Rhine River, turning it red, the Seveso Directive was amended and replaced in 1996 with the Seveso II Directive.70 The regulation requires owners or operators of facilities that contain threshold quantities of listed substances to submit safety reports to a competent authority (CA) within a Member State of the European Commission for its review and acceptance.71 These reports must demonstrate to the CA that major-accident prevention policies, safety management systems, and internal emergency plans have been created and implemented.72 The current system. The Refinery NEP is a primary example of proactive inspections to verify compliance. It was discontinued in 2011. 67 The term Dioxin refers to a family of toxic chemicals. They have been characterized by EPA as likely to be human carcinogens and are anticipated to increase the risk of cancer at background levels of exposure. See http://www.epa.gov/pbt/pubs/dioxins.htm (accessed June 17, 2013). 68 The European Commission consists of 27 Commissioners and “represents the interests of the EU [European Union] as a whole. It proposes new legislation to the European Parliament and the Council of the European Union, and it ensures that EU law is correctly applied by member countries.” http://ec.europa.eu/atwork/index_en.htm (accessed May 6, 2013). 69 See http://ec.europa.eu/environment/seveso/ (accessed May 6, 2013). 70 The Seveso Directive was adopted in 1982 and was amended twice, in 1987 and 1988. On December 9, 1996, the Seveso II Directive was adopted and replaced the original Seveso Directive. The Seveso III Directive was then adopted on July 4, 2012, and became effective on August 13, 2012. Member States must implement Seveso III by June 1, 2015. http://ec.europa.eu/environment/seveso/ (accessed May 6, 2013). 71See http://ec.europa.eu/environment/seveso/legislation.htm (accessed May 6, 2013). 72 Seveso II Directive, Article 9 (1996). Available at http://eur- lex.europa.eu/LexUriServ/LexUriServ.do?uri=CONSLEG:1996L0082:20031231:EN:PDF (accessed July 15, 2013). 22

Chevron Richmond Refinery Regulatory Report October 2014

regulation also requires owners or operators to “prove to the competent authority…that he has taken all measures necessary as specified in this Directive.”73 On June 1, 1974, the Flixborough Works of Nypro (UK) Limited experienced a massive cyclohexane vapor cloud explosion, killing 28 workers and injuring 36 workers and hundreds of members of the public offsite. This incident along with the Seveso incident led to the Seveso Directive in 1982, and this was converted into legislation in the United Kingdom (UK) via the Control of Industrial Major Accident Hazards (CIMAH) 1984 Regulations. The Control of Major Accidents74 Hazards Regulations (COMAH) replaced CIMAH in April 1999 to conform to the updated Seveso II Directive. The Health and Safety Executive75 (HSE), the Environment Agency76 (EA), and the Scottish Environmental Protection Agency77 (SEPA) are considered to be the UK’s CA responsible for the enforcement of these regulations. A key feature differentiating these two regulations is the increasing emphasis from the operator having to “describe” the safety systems in CIMAH to being required to “demonstrate” their adequacy in COMAH.78 73 Seveso II Directive, Article 5, Paragraph 2 (1996). Available at http://eurlex.europa.eu/LexUriServ/LexUriServ.do?uri=CONSLEG:1996L0082:20031231:EN:PDF (accessed July 15, 2013). 74 The COMAH regulations define “major accident” as “an occurrence (including in particular, a major emission, fire or explosion) resulting from uncontrolled developments in the course of the operation of any establishment and leading to serious danger to human health or the environment, immediate or delayed, inside or outside the establishment, and involving one or more dangerous substances…” COMAH Regulations, Part 1, Regulation 2 (2005). 75 HSE is an independent regulator, and “act[s] in the public interest to reduce work-related death and serious injury across Great Britain’s workplaces.” See http://www.hse.gov.uk/aboutus/ (accessed May 7, 2013). According to the HSE’s Enforcement Policy Statement, the HSE’s purpose is “to protect the health, safety and welfare of people at work, and to safeguard others, mainly members of the public, who may be exposed to risks from the way work is carried out.” http://www.hse.gov.uk/pubns/hse41.pdf (accessed May 7, 2013). 76 EA is an Executive Non-departmental Public Body responsible for protecting the environment and promoting sustainable development. For more information see http://www.environment-agency.gov.uk/default.aspx (accessed July 17, 2013). 77 SEPA is Scotland’s environmental regulator, aimed at protecting and improving the environment. For more information see http://www.sepa.org.uk/ (accessed July 17, 2013). 78 COMAH Regulations. Schedule 4, Part 1. Purpose of safety reports is to “1. demonstrate[e] that a major accident prevention policy and a safety management system for implementing it have been put into effect in accordance with the information set out in Schedule 2; 2. Demonstrate[e] that major accident hazards have been identified and that the necessary measures have been taken to prevent such accidents and to limit their consequences for persons and the environment; 3. Demonstrate[e] that adequate safety and reliability have been incorporated into the – (a) design and construction, and (b) operation and maintenance, of any installation and equipment and infrastructure connected with its operation which are linked to major accident hazards within the establishment.…” (2005). 23

Chevron Richmond Refinery Regulatory Report October 2014

The COMAH regulations apply to all onshore facilities that have sufficient quantities of dangerous substances as listed in Schedule 179 of the regulations.80 The general duty for all duty holders of facilities covered under the COMAH regulations is to “take all measures necessary to prevent major accidents and limit their consequences to people and the environment.”81 The HSE interprets this duty as the equivalent of reducing risks82 to “as low as reasonably practicable,” or ALARP.83,84,85 Duty holders are required to prepare a safety report that “demonstrate[s] to the CA that all measures necessary for the prevention and mitigation of major accidents have been taken.”86 These reports must contain information for the CA to review and analyze, including a policy on preventing and mitigating major accidents; a management system for implementing that policy that complies with good practice;87 an effective method for identifying any major accidents that might occur; and measures to prevent and mitigate major accidents.88 To assist operators with reducing risks to ALARP, the HSE publishes guidance documents that contain good practice guidelines and standards and that discuss what constitutes good practice.89 79 Available at http://www.legislation.gov.uk/uksi/1999/743/schedule/1/made (accessed June 17, 2013). 80 COMAH Regulations, Part 1, Regulation 3 (2005). 81 COMAH Regulations, Part 2, Section 4 (2005). 82 HSE describes “risk” as “the likelihood that a hazard will actually cause its adverse effects, together with a measure of the effect.” See http://www.hse.gov.uk/risk/theory/alarpglance.htm (accessed May 7, 2013). 83 See http://www.hse.gov.uk/foi/internalops/hid_circs/permissioning/spc_perm_37/ (accessed May 15, 2013). 84 The principal health and safety legislation in the UK is the Health and Safety at Work etc. Act 1974. It requires employers to ensure that risks to employees and others are reduced “so far as is reasonably practicable,” or SFAIRP. Health and Safety at Work etc. Act, Part I, Section 2 (1) and (2) (1974). HSE has interpreted that SFAIRP duties call for the same set of tests to be applied as duties to reduce risks “as low as reasonably practicable,” or ALARP. According to HSE, “”the two terms mean essentially the same thing and at their core is the concept of ‘reasonably practicable’;…” See http://www.hse.gov.uk/risk/theory/alarpglance.htm (accessed May 7, 2013). 85 According to HSE, the concept of “reasonably practicable” “involves weighing a risk against the trouble, time and money needed to control it. Thus, ALARP describes the level to which [they] expect to see workplace risks controlled.” This allows HSE to “set goals for duty-holders, rather than being prescriptive; HSE’s policy is that any proposed regulatory action should be based on what is reasonably practicable.” According to HSE, in most situations, deciding whether the risks are ALARP involves a “comparison between the control measures a duty- holder has in place or is proposing and the measures [they] would normally expect to see in such circumstances i.e. relevant good practice. ‘Good practice’ is defined as ‘those standards for controlling risk that HSE has judged and recognized as satisfying the law, when applied to a particular relevant case, in an appropriate manner.’… Once what is good practice has been determined, much of the discussion with duty-holders about whether a risk is or will be ALARP is likely to be concerned with the relevance of the good practice, and how appropriately it has been (or will be) implemented.” See http://www.hse.gov.uk/risk/theory/alarpglance.htm (accessed May 7, 2013). 86COMAH Regulations, Schedule 4, Part 1 (2005). See http://www.hse.gov.uk/comah/background/comah99.htm (accessed May 7, 2013). 87 HSE defines “good practice” as “those standards for controlling risk that HSE has judged and recognized as satisfying the law, when applied to a particular relevant case, in an appropriate manner.” HSE, “Assessing compliance with the law in individual cases and the use of good practice,” May 2003. Available at http://www.hse.gov.uk/risk/theory/alarp2.htm (accessed June 11, 2013). 88 COMAH Regulations, Schedule 4, Part 2 (2005). See http://www.hse.gov.uk/comah/background/comah99.htm (accessed May 7, 2013). 89 Such as HSE’s “Guidance for the topic assessment of the major accident hazard aspects of safety cases,” published in April 2006, and HSE’s “Assessing compliance with the law in individual cases and the use of good practice,” May 2003, available at http://www.hse.gov.uk/risk/theory/alarp2.htm (accessed June 11, 2013). 24

Chevron Richmond Refinery Regulatory Report October 2014

  1. 2.1.2

Offshore The international offshore energy sector experienced several catastrophic incidents in the 1980s, including the Alexander Kielland 90 incident in Norway in 1980 which resulted in 123 fatalities, and the Piper Alpha91 incident in the UK in 1988, which fatally injured 167 workers. These incidents initiated offshore regulatory changes focused on risk reduction and control that were modeled after the CIMAH regulations. Following the Piper Alpha incident, the UK Secretary of State for the Department of Energy ordered that a public inquiry be held to determine the circumstances surrounding the incident.92 The Secretary directed Lord Cullen, a Senator of the College of Justice in Scotland, to hold the inquiry and report to the Secretary “the circumstances of the accident and its cause together with any observations and recommendations which he thinks fit to make with a view to the preservation of life and the avoidance of similar accidents in the future.”93 The result was The Public Inquiry into the Piper Alpha Disaster (“the Cullen Report”), an extensive report released in October 1990. The report called into question the adequacy of the detailed prescriptive regulatory regime that existed at the time of the incident94 for offshore oil and gas operations, and listed 106 recommendations to revamp offshore safety regulation in the UK, 57 of which the HSE was responsible for overseeing.95 The Cullen Report found that the operating company (Occidental Petroleum, a US company), “did not possess any system which ensured that such remote, but potentially disastrous, events were subjected to systematic scrutiny…[and] there was for major projects no comprehensive system of safety assessment and management did not appear to appreciate fully the contribution which it could make.”96 The report noted that there was a need for a formal safety assessment (FSA), “an assessment essentially equivalent to the Safety Case,”97 which “involves the identification and assessment of hazards over the whole life cycle of a project…[because]…the combinations of potential hardware and human failures are so numerous that a major accident hardly ever repeats itself…[and] [a] strategy for risk management must [] address the entire spectrum of possibilities.”98 90 The Alexander Kielland was a flotel for housing workers. A total of 212 people were on board when it capsized near the Edda platform in the Ekofisk area of the North Sea on March 27, 1980. As a result of this incident, 123 individuals lost their lives and only 89 survived. 91 On July 6, 1988, an explosion occurred aboard the Piper Alpha oil production platform 120 miles off the coast of Scotland in the North Sea. A series of explosions and fire killed 167 workers and almost completed destroyed the platform. This incident became the deadliest accident in the history of the offshore industry. 92 Department of Energy. The Public Inquiry into the Piper Alpha Disaster; Presented to Parliament by the Secretary of State for Energy by Command of her Majesty; November 1990; p iii. 93 Department of Energy. The Public Inquiry into the Piper Alpha Disaster; Presented to Parliament by the Secretary of State for Energy by Command of her Majesty; November 1990; p iv. 94Department of Energy. The Public Inquiry into the Piper Alpha Disaster; Presented to Parliament by the Secretary of State for Energy by Command of her Majesty; November 1990; p 27. 95 Oil &Gas UK. Piper Alpha: Lessons Learnt; 2008; p 2. 96 Department of Energy. The Public Inquiry into the Piper Alpha Disaster; Presented to Parliament by the Secretary of State for Energy by Command of her Majesty; November 1990; p 275. 97 Lord Cullen describes the Safety Case as “a means by which an operator demonstrates to itself the safety of its activities…[and] as the basis for the regulation of major hazard activities…” Ibid at 276-277. 98 Ibid. 25

Chevron Richmond Refinery Regulatory Report October 2014

In his analysis, Lord Cullen noted that the current offshore regulations were prescriptive in nature rather than goal-setting, and that this had the effect of hampering operators’ flexibility and stifling innovation.99 He stated that “one of the reasons for adopting the goal-setting approach was to make regulations that were more flexible, so that changing technology could be accommodated without the need for new legislation.”100 Lord Cullen pointed to the CIMAH Regulations, discussed above, as a forward-looking regulatory model, which required onshore major hazard installation operators to “provide HSE with a written report on the safety of the installation…commonly called the Safety Case.”101 Lord Cullen noted that the safety case “is a means by which an operator demonstrates to itself the safety of its activities…[and] also serves as the basis for the regulation of major hazard activities.”102 Lord Cullen concluded that an FSA “is an essential element in a modern safety regime for major hazard installations…that this FSA should take the form of a Safety Case…[and that] [t]he regime should have as its central feature demonstration of safe operation by the operator.”103 He recommended that a safety case regulatory regime be implemented offshore for both fixed and mobile installations as it already was for onshore major hazard installations, that it be complemented by other regulations dealing with specific features, that the safety case contain goal-setting regulations, and that it be part of a continuing dialogue between the operator and the regulatory body.104 Lord Cullen recommended the implementation of safety regulations requiring the owner or operator of every fixed and mobile installation operating in UK waters to submit a safety case to HSE. In response, the UK established the Offshore Installations (Safety Case) Regulations in 1992.105 The primary goal of these Regulations was “to reduce the risks from major accident hazards to the health and safety of the workforce employed on offshore installations or in connected activities.”106 Oil & Gas UK, 107 the main UK offshore oil industry trade association whose members include the major oil companies that operate in the Gulf of Mexico (such Shell and Exxon), has expressed strong support for the safety case regime. In its response to the European Commission’s published draft legislative proposals to modify offshore safety case regulations, Oil & Gas UK noted that those proposals would undermine the “proactive, flexible and responsive approach to managing risks, borne out of the lessons learnt from Piper Alpha as well as the evolving nature of the offshore oil and gas business itself.”108 In the wake of the Macondo incident in the Gulf of Mexico, the UK government directed Professor Geoffrey 99 Department of Energy. The Public Inquiry into the Piper Alpha Disaster; Presented to Parliament by the Secretary of State for Energy by Command of her Majesty; November 1990; p 339. 100 Department of Energy. The Public Inquiry into the Piper Alpha Disaster; Presented to Parliament by the Secretary of State for Energy by Command of her Majesty; November 1990; p 364. 101 Ibid at 276. 102 Ibid at 276 and 277. 103 Ibid at 282. 104 Ibid at 283 and 284. 105 The 1992 Regulations have since been replaced by the Offshore Installations (Safety Case) Regulations 2005, which were effective as of April 6, 2006. The objective of the revisions in 2005 was “to improve the effectiveness of the regulations whilst at the same time reducing the burden of three yearly resubmissions.” Oil & Gas UK. Piper Alpha: Lessons Learnt; 2008. 106 HSE. A Guide to the Offshore Installations (Safety Case) Regulations 2005: Guidance on Regulations; 2006; p

  1. http://www.hse.gov.uk/pubns/priced/l30.pdf (accessed May 7, 2013).

107 See http://www.oilandgasuk.co.uk/aboutus/aboutus.cfm (accessed December 10, 2013). 108 Oil & Gas UK. European Commission Proposed Regulation on Offshore Safety and Related Issues: Oil & Gas UK Position Paper. November 2011; p 1. http://www.oilandgasuk.co.uk/ProposedEURegulation.cfm (accessed December 10, 2013). 26

Chevron Richmond Refinery Regulatory Report October 2014

Maitland of Imperial College London to lead an independent review of the offshore safety case regime in the UK.109 In the report stemming from the review, which highlighted strengths of the safety case regime as well as recommendations for improvement, Professor Maitland commended the UK’s “‘goal-setting’ safety regime and its ability to foster innovation and continuous improvement in process integrity…”110 and noted that the UK authorities, including the HSE, are held in high regard by both the UK operators and international observers.111 3.2.2 Global Analysis of Safety Case Implementation 3.2.2.1 Australia 3.2.2.1.1 Offshore Following the Piper Alpha disaster in 1988, the then Australian Commonwealth Minister for Resources at the time, Senator Peter Cook, formed a Consultative Committee on Safety in the Offshore Petroleum Industry to advise him on safety issues surrounding offshore operations in Australia. In 1991, the Committee released its Report of the Consultative Committee on Safety in the Offshore Petroleum Industry.112 In the report, the Committee examined the circumstances, causes, and recommendations described in both the Cullen Report and Esso Australia’s113 investigation report on a fire that occurred on the Tuna platform in April 1989 in Bass Strait that injured four individuals. The Committee noted that while there were many differences between the two incidents, they “both demonstrated the need for greater attention to the management of safety in a number of areas of offshore operations.”114 They pointed to the safety case as an important regulatory concept that should be applied to oil and gas operations in Australian waters, and concluded by recommending that the safety case concept described by Lord Cullen and carried out onshore by the Seveso Directive and CIMAH regulations be adopted for Australian offshore petroleum operations.115 It would “require the operator of a facility to formally document how safety is to be managed within the facility, [and] [] demonstrate that the major hazards of the installation have been identified and appropriate controls provided…”116 The Committee also recommended the implementation of both prescriptive and “objective” regulations.117 At that time, offshore petroleum safety was the joint responsibility of the Commonwealth and the States/Northern Territory. Following this inquiry, new Commonwealth regulations were created: for example, Schedule 109 Maitland, Geoffrey. Offshore Oil and Gas in the UK: an independent review of the regulatory regime. December 2011. https://www.gov.uk/government/uploads/system/uploads/attachment_data/file/48252/3875- offshore-oil-gas-uk-ind-rev.pdf (accessed December 10, 2013). 110 Ibid at 3. 111 Ibid at 3. 112 See http://www.mrt.tas.gov.au/mrtdoc/petxplor/download/OR_0935/OR_0935.pdf (accessed May 8, 2013). 113 Esso was an oil and gas company in Australia that was sold to Mobil Oil Corporation in 1990. It is now part of Exxon Mobil. See http://www.exxonmobil.com/Australia-English/PA/about_who_history_esso.aspx (accessed May 8, 2013). 114 Report of the Consultative Committee on Safety in the Offshore Petroleum Industry, 1991; p 2. See http://www.mrt.tas.gov.au/mrtdoc/petxplor/download/OR_0935/OR_0935.pdf (accessed May 8, 2013). 115 Ibid at 25. 116 Report of the Consultative Committee on Safety in the Offshore Petroleum Industry, 1991; p 3. See http://www.mrt.tas.gov.au/mrtdoc/petxplor/download/OR_0935/OR_0935.pdf (accessed May 8, 2013). 117 Ibid. 27

Chevron Richmond Refinery Regulatory Report October 2014

8 on “Occupational Health and Safety” was added to the Petroleum Submerged Lands Act (PSLA) in 1992 to require safety cases to be developed for all offshore petroleum facilities. The Offshore Petroleum and Greenhouse Gas Storage (Safety) Regulations 2009 set out the requirements for the contents of offshore safety cases. The operator of an offshore petroleum facility must submit a safety case for review and acceptance to the Australian National Offshore Petroleum Safety and Environmental Management Authority (NOPSEMA), the Australian Commonwealth Statutory Agency charged with regulating the health and safety, structural integrity, and environmental management of all offshore petroleum facilities in Australian Commonwealth waters, and in coastal waters where State powers have been reduced. NOPSEMA accepts a safety case “if it is satisfied that the arrangements set out in the document demonstrate that the risks will be reduced to…ALARP.”118 3.2.2.1.2 Onshore In 1998, Esso Australia’s gas plant at Longford in Victoria suffered a major release and fire caused by cold temperature embrittlement due to a process upset and lack of engineering support for diagnosis, which resulted in two fatalities, eight additional injuries, and cut the State of Victoria’s gas supply for two weeks causing major industrial disruption and workforce stand downs. While the safety case at this time was required for offshore operations in Australia, onshore facilities like the Longford plant were subject only to prescriptive provisions contained within the Victoria Occupational Health and Safety Act 1985. In its report on the incident, the Royal Commission concluded that all major hazard facilities in Victoria should be required to develop and submit a safety case to the appropriate regulatory authority. In 1996, Australia’s National Occupational Health and Safety Commission119 (NOHSC) recommended the safety case be adopted for all major onshore hazard facilities in Australia, and in 2002 NOHSC established a National Standard for the Control of Major Hazard Facilities and a National Code of Practice for the Control of Major Hazard Facilities.120 The Standard states that operators of major hazard facilities “shall provide the relevant public authority with a safety report…” that, among other things, identifies the type, relative likelihood and consequences of major accidents that might occur, and provides details of the safety management system (SMS) for that facility.121 In addition, operators of major hazard facilities must identify all major hazards and the risks associated with those hazards, and minimize each risk “so far as practicable.”122 118 See http://www.nopsema.gov.au/safety/safety-case/what-is-a-safety-case/ (accessed July 15, 2013). 119 In 1985 The National Occupational Health and Safety Commission (NOHSC) was established as a tripartite body to develop, facilitate and implement a unified national approach to occupational health and safety in Australia. On January 1, 2006, NOHSC was replaced by the Australian Safety and Compensation Council (ASCC). On March 31, 2009, the ASCC was abolished and replaced with Safe Work Australia. Safe Work Australia was established by the Safe Work Australia Act 2008 with the authority to help develop policy to improve worker health, safety, and compensation across Australia. It does not regulate work health and safety laws; rather it develops national policy. See http://www.safeworkaustralia.gov.au/sites/swa/about/pages/about (accessed May 8, 2013). 120 National standards are documents which prescribe preventative action to avert occupational deaths, injuries and diseases; national codes of practice are documents prepared for the purpose of advising employers and workers of acceptable ways of achieving national standards. National Standard for the Control of Major Hazard Facilities [NOHSC: 1014(2002)], p 2. http://www.safeworkaustralia.gov.au/sites/SWA/about/Publications/Documents/271/NationalStandard_ControlMajo rHazardFacilities_NOHSC_1014-2002_PDF.pdf (accessed May 8, 2013). 121 Ibid at 13. 122 Ibid at 12. 28

Chevron Richmond Refinery Regulatory Report October 2014

According to the Australian Safety and Compensation Council’s 2004 Annual Situation Report for the National Standard for the Control of Major Hazard Facilities, all Australian jurisdictions were expected to have the standard in place before the end of 2005, roughly three years after its inception.123 3.2.2.2 Norway Following the capsizing of the Alexander Kielland in 1980, Norway moved in a direction similar to the European Commission and developed performance-based regulations focused on major accident prevention. Although the country did not adopt the safety case regulatory regime per se, the current regulatory approach implements many similar elements. Currently in Norway, the Petroleum Safety Authority124 (PSA) regulates safety for activities at onshore and offshore major hazard facilities, and requires the responsible party125 to reduce risk “to the extent possible,” and “select technical, operational and organisational solutions that reduce the probability that harm, errors and hazard and accident situations occur.”126 This concept is akin to ALARP whereby companies choose the solutions and barriers that have the greatest risk-reducing effect, provided the costs are not significantly disproportionate to the risk reduction achieved.127 However, unlike the UK and Australia, PSA regulations do not require the submission of a safety case report by the operator of a facility, although facilities are still expected to develop them and make them available to the regulator upon request for auditing purposes. Rather, PSA “supervises” industry, as explained in the following: Supervision involves much more than audits offshore or on land. It embraces the total contact between the regulator and the regulated. It covers everything which gives the PSA the necessary basis to determine whether the companies are accepting their responsibility to operate acceptably in all phases. Supervisory activities include investigations, considering consent applications and meetings with the industry.128 As will be discussed below, because the safety case regulatory approach requires the regulator to conduct detailed assessments of safety case reports and auditing of facilities against the safety case, its implementation requires substantial funding to support and maintain a sufficient number of highly experienced and competent staff. 123Australian Safety and Compensation Council. Major Hazard Facilities Annual Situation Report; 2004; p1. http://www.safeworkaustralia.gov.au/sites/SWA/about/Publications/Documents/475/MHFAnSituationReport_2004. pdf (accessed May 8, 2013). 124 The Petroleum Safety Authority (PSA) is “the regulatory authority for technical and operational safety and for the working environment.” PSA was created in 2004 as a result of a government decision to split the Norwegian Petroleum Directorate (NPD) into two parts. See http://www.ptil.no/main-page/category9.html (accessed May 8, 2013). 125 PSA defines a “responsible party” as “[t]he operator and others participating in activities covered by these regulations, without being a licensee or owner of an onshore facility.” Regulations Relating to Health, Safety and the Environment in the Petroleum Activities and at Certain Onshore Facilities (The Framework Regulations); Section 6(a). Definitions. http://www.ptil.no/framework-hse/category403.html (accessed November 26, 2013). 126 PSA. Regulations Relating to Health, Safety and the Environment in the Petroleum Activities and at Certain Onshore Facilities (The Framework Regulations); Section 11, Risk Reduction Principles. http://www.ptil.no/framework-hse/category403.html (accessed November 26, 2013). 127 Ibid. 128 http://www.ptil.no/supervision/what-is-supervision-article8519-88.html (accessed June 3, 2013). 29

Chevron Richmond Refinery Regulatory Report October 2014

  1. 2.2.3

The United States Despite the international shift to the safety case regime and even though major oil companies that operate both onshore and offshore in the US also operate globally under safety case regimes and have shown support for the safety case,129 the US has persisted in the use of a more activity-based regulatory scheme that does not contain a specific risk reduction target and that lacks the ability to adapt to advancing technology and recently developed industry standards. Due to the major potential hazards present in onshore and offshore oil and gas operations, these sectors should have in place adaptable safety regimes that adequately engage companies and their employees in continuous improvement and risk reduction. As the CSB has devoted extensive time and resources to studying and analyzing the regulation of offshore oil and gas facilities in the US as a result of its Macondo incident investigation, this report will focus on the regulation of onshore oil and gas operations in the US and California. On October 23, 1989, a massive explosion and fire occurred at the Phillips 66 Company’s Houston Chemical Complex in Pasadena, Texas, resulting in 23 fatalities and injuring more than 130. In response, the U.S. Department of Labor issued a report to the President and declared, among other things, that the U.S. Occupational Safety and Health Administration (OSHA) would “expedite completion of its rulemaking requiring employers to implement comprehensive chemical process safety management plans for hazardous chemical processes.”130 Sparked by a number of serious accidents, including the Phillips 66 incident and the 1984 toxic release in Bhopal, India, which resulted in several thousand known fatalities, OSHA published in the Federal Register (55 FR 29150) on July 17, 1990, a proposed standard containing requirements for the management of hazards associated with processes using highly hazardous chemicals.131 Soon after, Congress adopted the Clean Air Act (CAA) Amendments (CAAA) of 1990, 129A Shell Oil Company representative testified at the CSB December 2010 public meeting on the safety case that the company had been using the safety case globally since 2002, and noted that the most valuable aspect of that type of regulatory regime was the need to demonstrate that major hazards have been managed using effective barriers and controls. Shell Geelong Refinery Plant Manager Huck Poh has stated, “As a Major Hazard Facility, Shell Geelong Refinery and Lara Terminal is required to submit a Safety Case for assessment by Safe Work Victoria. This document is a summary of that Safety Case and explains the potential impact of the facility on our neighbours and the community. We take a systematic approach to managing safety and preventing incidents that place our people, our neighbours, the Geelong community, the environment and our facilities at risk. This is reflected in our Safety Management System and the approach that has been undertaken for the development and review of the Safety Case. Shell is committed to achieving continuous Health, Safety, Security and Environment (HSSE) performance improvement. There are ongoing review and revision activities to ensure our analyses remain relevant and reflect the current status of operations and our risk reduction measures are consistent with latest industry practice. This commitment to continuous improvement is reflected in the Shell HSSE Policy and supported by our HSSE results.” See http://s04.static-shell.com/content/dam/shell-new/local/country/aus/downloads/geelong/safety-case- summary.pdf p3. (accessed December 10, 2013). Esso Longford Plant Manager Monte Olson has stated that “[t]he Safety Case is a systematic and comprehensive review of our operations and processes which includes the identification of potential major incidents that could occur, assesses the risks associated with these major incidents and demonstrates the controls we have in place to manage these risks to as low as reasonably practicable.” See http://www.exxonmobil.com/Australia-English/PA/Files/publication_Longford_Safety_Case_2013.pdf p5. (accessed December 10, 2013). 130 Dole, Elizabeth. Phillips 66 Company Houston Chemical Complex Explosion and Fire: Implications for Safety and Health in the Petrochemical Industry, A Report to the President; April 1990; p ix. http://ncsp.tamu.edu/reports/phillips/first%20part.pdf (accessed August 6, 2013). 131 Preamble to Process Safety Management of Highly Hazardous Chemicals; Explosives and Blasting Agents. Section 1 – I. Background (March 4, 1992). See http://www.osha.gov/pls/oshaweb/owadisp.show_document?p_table=PREAMBLES&p_id=1039 (accessed May 10, 2013). 30

Chevron Richmond Refinery Regulatory Report October 2014

which resulted in the creation of the CSB and authorized the first federal regulations specifically designed to prevent major chemical accidents that threaten workers, the public, and the environment: OSHA’s Process Safety Management (PSM) standard and the U.S. Environmental Protection Agency’s (EPA’s) Risk Management Program. 3.2.2.3.1 OSHA PSM Standard Section 304 of the CAAA mandated that OSHA develop “a chemical process safety standard designed to protect employees from hazards associated with accidental release of highly hazardous chemicals in the workplace.”132 OSHA responded by adopting 29 CFR §1910.119 Process Safety Management of Highly Hazardous Chemicals (“the PSM standard”) in 1992. The PSM standard applies to a process133 involving a chemical at or above the listed threshold quantity (also known as a highly hazardous chemical), or flammables in a quantity of 10,000 pounds or more.134 It contains 14 elements with broad requirements to implement management systems, identify and control hazards, and prevent “catastrophic releases of highly hazardous chemicals.” While the PSM standard was intended to be performance-based and does contain some goal-setting elements, a majority of the standard is activity-based, and there is no general duty requirement under the PSM standard to reduce risks to a certain extent or prevent catastrophic accidents. As will be discussed at length in Section 4.3, the PSM standard has essentially remained stagnant since its inception in 1992. According to the Center for Chemical Process Safety (CCPS), the PSM standard has resulted “in a minimum cost, compliance-based approach to managing process safety… ‘If [it] isn’t a regulatory requirement, I’m not going to do it!’”135 A key provision of the PSM standard is the process hazard analysis (PHA) of covered processes. 136 PHA requirements include a review of the process to identify, evaluate, and control the hazards, and an evaluation of the consequences of failure of those controls.137,138 The PHA required by the OSHA PSM standard is an example of a goal-setting requirement in that it allows for a variety of hazard analysis methodologies to be performed to satisfy the requirement. However, the element is activity-based in that completing a PHA for each covered process and updating it at least every five years is satisfactory. The regulator is not responsible for evaluating the effectiveness of controls or safeguards, and there is no requirement to reduce risks to a certain extent such as ALARP. Thus, the resulting PHA that meets the 132 Clean Air Act Amendments of 1990. Section 304(a). November 5, 1990. See http://www.epa.gov/air/caa/caaa.txt (accessed May 10, 2013). 133 The PSM standard defines “process” as “any activity involving a highly hazardous chemical including any use, storage, manufacturing, handling, or the on-site movement of such chemicals, or combination of these activities.” 29 CFR §1910.119(b) (1992). 134 29 CFR §1910.119(a)(1) (1992). This standard also applies to the manufacture of explosives and pyrotechnics in any quantity [29 CFR §1910.109(k)(2) & (3)]. 135 CCPS. Guidelines for Risk Based Process Safety. 2007; p 2. 136 A Process hazard analysis is a thorough, orderly, systematic approach for identifying, evaluating, and controlling hazards of processes involving highly hazardous chemicals. The employer must perform an initial process hazard analysis on all processes covered by the PSM standard and all process hazard analyses must be updated and revalidated, based on their completion date, every five years. See http://www.osha.gov/doc/outreachtraining/htmlfiles/psm.html (accessed May 10, 2013). 137 29 CFR §1910.119(e) (1992). 138 The other elements of the PSM standard are process safety information, operating procedures, employee participation, training, contractor safety, pre-startup safety review, mechanical integrity, hot work permits, management of change, incident investigation, emergency planning and response, and compliance audits. The 14th “element” is mainly a requirement that maintaining trade secrecy not interfere with an employer’s compliance with the other 13 elements. 31

Chevron Richmond Refinery Regulatory Report October 2014

regulatory requirements of “controlling” hazards may actually inadequately identify or mitigate the hazards. In addition, there is no requirement for employers to submit their PHAs to the regulator for review. In most cases, this means the regulator will not review these PHAs until there is a significant process accident, a complaint, or a (rare) planned inspection.

Another key element of the PSM standard, the Management of Change (MOC) provision, requires the development of written procedures “to manage changes to process chemicals, technology, equipment, and procedures…”139 The procedures must consider, among other things, the technical basis for a proposed change and its potential impact on safety and health.140 Historically, the MOC requirement has been treated and enforced as an activity-based requirement as well. For example, when the BP Texas City refinery explosion and fire occurred on March 23, 2005, all 15 fatalities and many of the 180 injuries occurred in or around nine contractor trailers that were sited near process areas and as close as 121 feet to the isomerization (ISOM) unit where the incident occurred. The refinery had been using trailers as temporary office spaces for several years. The refinery addressed facility siting for trailers during its 2004 MOC for an upcoming 2005 turnaround. The MOC form indicated that a double-wide mobile office trailer would be temporarily sited in the open area between the ISOM and naphtha desulfurization units (NDU) for use during the upcoming turnaround, to be removed at the end of April 2005. However, the MOC did not analyze siting hazards; rather the MOC team attached a drawing showing the proposed interior configuration of the trailer and measured its location from the catalyst warehouse.141 In early 2005, eight other trailers were sited between the ISOM and NDU without even conducting an MOC. The CSB pointed out in its Urgent Recommendations stemming from the Texas City incident that these trailers could have been easily relocated to less hazardous sites, and BP did so following the incident.142 Despite this fact, BP’s siting policy considered that utilizing trailers in this way posed little or no danger to occupants, which conformed with the American Petroleum Institute’s (API) Recommended Practice (RP) 752, Management of Hazards Associated with Location of Process Plant Buildings.

Although the MOC failed to identify or analyze hazards stemming from siting trailers so close to process areas, OSHA did not cite BP for conducting a poor MOC following the incident, as merely completing the MOC satisfied the requirements of the PSM standard. As it would have been very practical to move the trailers to a safer location, a regulator under the safety case regulatory regime would have the ability to require BP to do just that to reduce risks to ALARP.

The OSHA PSM standard includes requirements for two of its 14 elements – mechanical integrity and process safety information (PSI) – to comply with recognized and generally accepted good engineering practices, or RAGAGEP.143 RAGAGEPs are technologically focused, with no emphasis on 139 29 CFR §1910.119(l)(1) (1992). 140 Id at (l)(2)(i) and (ii) (1992). 141 To learn more about the PHA and MOC processes relating to the BP Texas City Refinery, see the CSB BP Texas City Final Investigation Report at http://www.csb.gov/assets/1/19/CSBFinalReportBP.pdf (accessed October 24. 2013). 142 See CSB Urgent Trailer Siting Recommendations at http://www.csb.gov/assets/1/19/BP_Recs_2.pdf (accessed October 24. 2013). 143 RAGAGEPs “are engineering, operation, or maintenance activities based on established codes, standards, published technical reports or recommended practices (RP) or a similar document. RAGAGEPs detail generally approved ways to perform specific engineering, inspection or mechanical integrity activities, such as fabricating a 32

Chevron Richmond Refinery Regulatory Report October 2014

organizational, human factors, or culture-based measures. OSHA developed the mechanical integrity RAGAGEP requirement to “make sure that process equipment is inspected and tested properly, and that the inspections and tests are performed in accordance with appropriate codes and standards.”144 OSHA has recognized a number of practices, guidelines, and standards as RAGAGEPs, including the American Society of Civil Engineers, Design of Blast Resistant Buildings in Petrochemical Facilities, the Department of Defense, TMS-1300 Structures to Resist the Effects of Accidental Explosions, and the American Petroleum Institute (API) Recommended Practice (RP) 520: Sizing, Selection, and Installation of Pressure-Relieving Devices in Refineries.145 Unlike other regulators such as the HSE, OSHA has not compiled a comprehensive list of good practices, or RAGAGEPs, for companies to utilize during operations, and the CSB has only identified two OSHA Letters of Interpretation regarding implementation of RAGAGEP in PSM. According to CCPS, “[o]rganizations lack a thorough understanding of recognized and generally accepted good engineering practices and are inconsistent in interpreting and applying them.”146 In addition, key PSM elements such as PHA, incident investigation, and MOC do not reference RAGAGEP, and have not kept up to date with good practice guidelines, including CCPS’ Guidelines for Risk Based Process Safety, which addresses 20 PSM elements for process safety, including human factors, workforce involvement, and safety culture.

Historically, OSHA has primarily enforced147 RAGAGEP reactively, and may cite companies for violations of RAGAGEPs following an incident. For example, following the BP Texas City Refinery incident, OSHA issued BP hundreds of citations, some of which covered BP’s willful violations of API 520 and the American Society of Mechanical Engineers (ASME) Boiler and Pressure Vessel Code, both considered by OSHA to be RAGAGEPs. Following the Chevron incident, California’s Division of Occupational Safety and Health (Cal/OSHA) issued Chevron two willful citations for allegedly not complying with API RP 939-C, Guidelines for Avoiding Sulfidation (Sulfidic) Corrosion Failures in Oil Refineries and Chevron’s own internal corrosion mitigation plan as RAGAGEPs (this will be discussed in greater detail in Section 5.1.2.2).

  1. 2.2.3.2 U.S. Environmental Protection Agency Risk Management Program

Section 301(r) of the CAAA called for EPA to develop regulations related to the prevention and detection of accidental releases for regulated substances, including requiring owners or operators of stationary sources that have regulated substances present to prepare and implement a “risk management plan to vessel, inspecting a storage tank, or servicing a relief valve.” OSHA Instruction CPL 03-00-004. June 7, 2007. https://www.osha.gov/pls/oshaweb/owadisp.show_document?p_id=3589&p_table=DIRECTIVES (accessed August 13, 2013). 144 OSHA. Preamble to 29 CFR Part 1910, Process Safety Management of Highly Hazardous Chemicals, Section 3, Title III. Summary and Explanation of the Final Rule, 1992. Available at http://www.osha.gov/pls/oshaweb/owadisp.show_document?p_table=PREAMBLES&p_id=1041 (accessed June 6, 2013). 145 All three are cited in OSHA Letter of Interpretation. Applicability of the PSM standard’s mechanical integrity requirements to refinery structures, February 1, 2010. http://www.osha.gov/pls/oshaweb/owadisp.show_document?p_table=INTERPRETATIONS&p_id=27443 (accessed June 6, 2013). 146 CCPS. Guidelines for Risk Based Process Safety. 2007; p 2. 147 An exception to this would be OSHA’s NEP that was implemented from 2007 to 2011, where OSHA inspectors cited to RAGAGEP following NEP audits. 33

Chevron Richmond Refinery Regulatory Report October 2014

detect and prevent or minimize accidental releases of such substances from the stationary source.…”148 The risk management plan would require a “hazard assessment to assess the potential effects of an accidental release of any regulated substance.”149 In 1996, EPA promulgated the Risk Management Program regulations at 40 CFR Part 68, which went into effect in 1999.

The EPA’s Risk Management Program requires facilities that contain more than the threshold quantity of any of the 77 listed toxic chemicals or 63 flammable substances150 to prepare and submit to the regulating agency emergency contact information, descriptions of processes and hazardous chemicals onsite, an accident history, and worst-case release scenarios.151 The regulation defines three different Program levels (Program 1, 2, or 3) based on a process unit’s potential for impact to the public and the requirements to prevent accidents.152 Program 3 processes are subject to additional, more stringent requirements to prevent accidents similar to those of the OSHA PSM standard. Program 3 facilities must implement elements of a prevention program, including: process safety information (PSI), PHA, standard operating procedures (SOPs), training, mechanical integrity, compliance audits, incident investigations, MOC, pre-startup reviews, employee participation, and hot work permits. These prevention program elements are based primarily on the OSHA PSM standard, and much of the language contained in each element is identical to the PSM standard. As such, the Risk Management Program regulations contain the same RAGAGEP requirements for mechanical integrity and PSI as the OSHA PSM standard for covered facilities. For example, 40 CFR §68.48 requires an owner or operator to “ensure that the process is designed in compliance with recognized and generally accepted good engineering practices [RAGAGEP].”153 Like OSHA, the EPA is able to cite facilities for failure to comply with RAGAGEP following an incident, but does not maintain a list of RAGAGEPs for reference.

Finally, each covered facility must submit a risk management plan (RMP) to EPA for all covered processes154 and update and resubmit these plans at least once every five years, or whenever a major accident occurs or the emergency contact information changes. Completing and submitting the RMP satisfies the regulatory requirement; again, the effectiveness of the RMP in risk reduction is not assessed by the EPA, rendering this another activity-based requirement for a covered facility. There is no approval of the RMP by the EPA, and there is no additional duty on the facility to implement what it says it is doing in the RMP, unlike the safety case regulatory regime.

Any facility with one or more covered processes must include in its RMP an executive summary; the registration for the facility; the certification statement; a worst-case scenario for each process involving flammables or toxics; the five-year accident history for each process; information concerning emergency 148 Clean Air Act Amendments of 1990. Section 301(r)(7)(B)(ii). November 5, 1990. See http://www.epa.gov/air/caa/caaa.txt (accessed May 10, 2013). 149 Clean Air Act Amendments of 1990. Section 301(r)(7)(B)(ii)(I). November 5, 1990. See http://www.epa.gov/air/caa/caaa.txt (accessed May 10, 2013). 150According to 40 CFR §68.10(a), “[a]n owner or operator of a stationary source that has more than a threshold quantity of a regulated substance in a process, as determined under §68.115, shall comply with the requirements of this part no later than the latest of the following dates.…” 151 See 40 CFR §68.12. General Requirements. 152 See 40 CFR §68.10. Applicability. 153 40 CFR §68.48(b) (1999). Additionally see 40 CFR §68.56 (d) which requires the owner or operator‘s inspection and testing procedures to “follow recognized and generally accepted good engineering practices.” 154 40 CFR §68.150 (1999). 34

Chevron Richmond Refinery Regulatory Report October 2014

response at the facility; at least one alternative release scenario analysis for each regulated toxic substance or flammable; a summary of the prevention program for each Program 2 process; and a summary of the prevention program for each Program 3 process.155

The CSB found in its BP Texas City Investigation Report that as of March 2007, the RMP regulation had focused primarily on reviewing the submitted RMPs and required updates by covered facilities. The EPA Office of Inspector General (OIG) concluded in 2009 that over half of the RMP-covered facilities identified in the US as high-risk156 had never received an on-site inspection or audit, and over 65 percent of all active RMP facilities had not received an on-site inspection or audit since inception of the RMP program in 1999.157 The EPA OIG also noted that of the 296 uninspected high-risk facilities regulated by the EPA, 151 of these could each impact 100,000 people or more in a worst-case accident scenario.158

  1. 2.2.3.3 Safety Case in the United States

In contrast to its mainly activity-based regulation of hazardous chemicals, including oil and gas operations, the US has adopted a more goal-based regulatory approach for its nuclear and aeronautics and space science sectors. The U.S. Nuclear Regulatory Commission (NRC) was an early adopter of goal or performance-based regulation, which it defines as “[a] regulatory approach that focuses on desired, measureable outcomes, rather than prescriptive processes, techniques, or procedures…[and] leads to defined results without specific direction regarding how those results are to be obtained.”159 According to the NRC, performance-based regulations permit licensees to “have flexibility to determine how to meet the established performance criteria in ways that encourage and reward improved outcomes.”160 The NRC’s Reactor Oversight Process, the means by which it achieves its mission of public health and safety in commercial nuclear power plant operations, is its primary 155 EPA Office of Solid Waste and Emergency Response. General Guidance on Risk Management Programs for Chemical Accident Prevention (40 CFR Part 68); March 2009; pp 9-1 and 9-2. See http://www.epa.gov/osweroe1/docs/chem/Toc_final.pdf (accessed May 14, 2013). 156 A high-risk facility is one that meets one of more of the following characteristics established by the EPA Office of Emergency Management: 1) Facilities whose reported RMP worst-case scenario population exceeds 100,000 people; 2) Any RMP Program facility with a hazard index greater than or equal to 25; and/or 3) Facilities that have had one or more significant accidental releases within the previous five years. See “EPA Office of Inspector General, “Improvements Needed in EPA Training and Oversight for Risk Management Program Inspections.” March 21, 2013; Page 5. Available at http://www.epa.gov/oig/reports/2013/20130321-13-P-0178.pdf (accessed June 11, 2013). 157 EPA OIG. Evaluation Report: EPA Can Improve Implementation of the Risk Management Program for Airborne Chemical Releases; February 10, 2009; p 15. 158 Ibid. 159 See NRC Glossary, available at http://www.nrc.gov/reading-rm/basic-ref/glossary/performance-based- regulation.html (accessed June 10, 2013). 160 US NRC NUREG/BR-0303. Guidance for Performance-Based Regulation (2002). http://www.nrc.gov/reading- rm/doc-collections/nuregs/brochures/br0303/br0303.pdf (accessed June 13, 2013). 35

Chevron Richmond Refinery Regulatory Report October 2014

performance-based regulation.161 It uses seven “cornerstones,” such as mitigating systems and barrier integrity, to monitor three performance areas (reactor safety, radiation safety, and security safeguards).162 Licensee performance data, inspection plans, quarterly assessments, and assessment and inspection responses are tied to each performance area and several cross-cutting objectives, such as worker involvement and human performance.163 Licensees are permitted to choose the precise methods they use to meet overarching performance goals, which are guided by their duty to reduce risks to as low as reasonably achievable, or ALARA.164,165 The NRC has stated that this flexibility is one of the main reasons that its regulatory philosophy encourages continuous improvement.166

The National Aeronautics and Space Administration (NASA) has the goal of implementing a safety system that is “as safe as reasonably practicable,” or ASARP,167 which it considers to be closely related to ALARP. NASA relies on a risk-informed safety case, or RISC,168 to ensure that the system’s safety objectives, goals, and thresholds have been achieved, and that safety risk is as low as possible within reasonable impacts on cost, schedule, and performance.169

161 http://www.nrc.gov/about-nrc/regulatory/risk-informed/concept/performance.html#example (accessed June 13, 2013). 162 NRC Reactor Oversight Process publication (2006), available at http://pbadupws.nrc.gov/docs/ML0708/ML070890365.pdf (accessed June 13, 2013). 163 NRC Reactor Oversight Process publication (2006), available at http://pbadupws.nrc.gov/docs/ML0708/ML070890365.pdf (accessed June 13, 2013). 164 US NRC NUREG/BR-0303, Guidance for Performance-Based Regulation (2002). http://www.nrc.gov/reading- rm/doc-collections/nuregs/brochures/br0303/br0303.pdf (accessed June 13, 2013). 165 ALARA “means making every reasonable effort to maintain exposures to radiation as far below the dose limits in this part as is practical consistent with the purpose for which the licensed activity is undertaken, taking into account the state of technology, the economics of improvements in relation to state of technology, the economics of improvements in relation to benefits to the public health and safety, and other societal and socioeconomic considerations, and in relation to utilization of nuclear energy and licensed materials in the public interest.” 10 CFR §20.1003 (2007). 166 US NRC NUREG/BR-0303, Guidance for Performance-Based Regulation (2002). http://www.nrc.gov/reading- rm/doc-collections/nuregs/brochures/br0303/br0303.pdf 167 NASA defines ASARP as “a fundamental principle of adequate safety. A determination that a system is ASARP entails weighing its safety performance against the sacrifice needed to further improve it. The system is ASARP if an incremental improvement in safety would require a disproportionate deterioration of system performance in other areas.” NASA/SP-2010-580, NASA System Safety Handbook, Volume 1, System Safety Framework and Concepts for Implementation; November 2011; p 5. http://ntrs.nasa.gov/archive/nasa/casi.ntrs.nasa.gov/20120003291_2012003429.pdf (accessed June 10, 2013). 168 NASA defines RISC as “a structured argument, supported by a body of evidence that provides a compelling, comprehensive and valid case that a system is or will be adequately safe for a given application in a given environment. This is accomplished by addressing each of the operational safety objectives that have been negotiated for the system, including articulation of a roadmap for the achievement of safety objectives that are applicable to later phases of the system life cycle. The term ‘risk-informed’ is used to emphasize that a determination of adequate safety is the result of a deliberative decision making process that necessarily entails an assessment of risks and tries to achieve a balance between the system’s safety performance and its performance in other areas.” Ibid at 13. 169 Ibid at xiii. 36

Chevron Richmond Refinery Regulatory Report October 2014

  1. 0 Key Features of an Effective Safety Case Regulatory Regime

Following the Macondo disaster, the National Commission on the Macondo Oil Spill and Offshore Drilling170 made a recommendation in its Report to the President171 for the US to “develop a proactive, risk-based performance approach specific to individual facilities, operations and environments, similar to the ‘safety case’ approach in North Sea.”172 Despite the major potential hazards that are present in both onshore and offshore oil and gas operations, the safety case regime has not been implemented in the US for either sector. The US has instead implemented for major hazards at onshore facilities a more activity- based approach, resulting in static regulations such as the PSM and RMP regulations that have not seen significant improvements173 since their inception, despite advances in technology and good industry practice. According to Dr. Hopkins and other renowned experts in the field, it is essential for an effective major accident prevention safety regime to take the form of a safety case, with adaptable goal-setting regulations that facilitate innovation and sustainability, and that drive industry to continuously improve and reduce risks to ALARP. To accomplish this, the regime must utilize sufficient numbers of highly competent personnel to effectively collect or promote industry use of process safety indicators174 and to provide knowledgeable oversight of industry operations. The CSB has determined that there are several key features of an effective major accident prevention regulatory approach such as the safety case regime: • Duty Holder Safety Responsibility, including a Written Case for Safety • Continuous Risk Reduction to ALARP • Adaptability and Continuous Improvement • Active Workforce Participation • Process Safety Indicators that Drive Performance • Regulatory Assessment, Verification, and Intervention; and an • Independent, Competent, Well-Funded Regulator As will be discussed in Section 5, California’s patchwork of regulations does not effectively implement these features, which are also illustrated in the figure below. Section 4 provides a detailed discussion of these features.

170 President Barack Obama established the National Commission on the BP Macondo Oil Spill and Offshore Drilling through Executive Order 13543 on May 21, 2010, to examine the facts and circumstances concerning the root causes of the Macondo explosion and fire. For more information see http://www.oilspillcommission.gov/page/about-commission (accessed June 17, 2013). 171 Available at http://www.oilspillcommission.gov/final-report (accessed June 17, 2013). 172 National Commission on the BP Macondo Oil Spill and Offshore Drilling. Report to the President: Deep Water, The Gulf Oil Disaster and the Future of Offshore Drilling; January 2011; 252. 173 OSHA did implement changes to 29 CFR §1910.106, creating a new Hazard Communication Standard. However, no changes have been made that impact the management of process safety under PSM. See https://www.osha.gov/dsg/hazcom/ (accessed August 6, 2013). 174 Process safety indicators are also referred to as performance indicators, metrics, key process indicators (KPI), performance measures, indicators, etc. 37

Chevron Richmond Refinery Regulatory Report October 2014

Figure 1. Safety Case Attributes. 4.1 Duty Holder Safety Responsibility, including a Written Case for Safety Under the safety case regulatory regime, each individual company is responsible for the safety of each hazardous facility. The onus is on the duty holder175 to prove to the regulator that the company’s processes, methodologies used to assess risks, and reasoning for choosing one control over another have substantially reduced risks to as low as reasonably practicable (ALARP), or equivalent. The duty holder 175 Duty holders are considered to be “those who create and/or have the greatest control of the risks associated with a particular activity. Those who create the risks at the workplace are responsible for controlling them.” HSE. Planning to do business in the UK offshore oil and gas industry? What you should know about health and safety; October 2011; p 2. http://www.hse.gov.uk/offshore/guidance/entrants.pdf (accessed June 5, 2013). These entities may include operators, contractors, and subcontractors. According to NOPSEMA, the idea is that those who create the risk must manage it. See http://www.nopsema.gov.au/safety/safety-case/what-is-a-safety-case/ (accessed July15, 2013). 38

Chevron Richmond Refinery Regulatory Report October 2014

is required to prepare a written case for safety176 (“safety case report”) that identifies the hazards and risks and describes how they will be reduced to ALARP. The HSE has noted that the safety case report “demonstrates that the duty holder has arrangements in place which, if implemented, are capable of achieving compliance with legal objectives set out in other [] regulations…[and] provides a comprehensive core document that can be used as a check by both the duty holder and HSE that the accepted risk control measures and the health and safety management systems are in place and operate as they should.”177 The HSE has also stated: [t]he principal matters to be demonstrated in a safety case are that: a) the management system is adequate to ensure compliance with statutory health and safety requirements; and for management of arrangements with contractors and sub-contractors, b) that adequate arrangements have been made for audit and for audit reporting, [and] c) that all hazards with the potential to cause a major accident have been identified, their risks evaluated, and measures have been, or will be, taken to control those risks to ensure that the relevant statutory provisions will be complied with.178 The safety case report must also demonstrate “how inherently safer design concepts have been applied in the design decisions taken.”179 This principle applies to all stages of the installation’s life cycle, and includes materials selection and managing corrosion in the design. It is also important to note that safety case reports are meant to be evergreen documents that reflect continuous improvement in risk reduction. For onshore operations in the UK, the duty holder is required to review the safety case report during the construction of a new facility, whenever new facts or technical knowledge about safety matters become known, or whenever the operator makes a change to the safety management system that could have significant impacts on the prevention of major accidents.180 The duty holder must revise the safety report to ensure that it “remains up to date and continues to provide an accurate representation of the major accident hazards…and the 176 The HSE defines “safety case” as “a document that gives confidence to both the duty holder and HSE that the duty holder has the ability and means to control major accident risks effectively. It provides an extra level of regulatory control on top of regulations such as the Offshore Installations (Prevention of Fire and Explosion, and Emergency Response) Regulations 1995 (PFEER) and the Offshore Installations and Wells (Design and Construction, etc) Regulations 1996 (DCR), justified by the major accident potential of the offshore activities within scope.” HSE. A Guide to the Offshore Installations (Safety Case) Regulations 2005: Guidance on Regulations; 2006; p 6. http://www.hse.gov.uk/pubns/priced/l30.pdf (accessed January 13, 2014). 177 Ibid at 6. 178 HSE. Assessment Principles for Offshore Safety Cases (APOSC); March 2006; p 7. http://www.hse.gov.uk/offshore/aposc190306.pdf (accessed August 6, 2013). 179 Ibid at 16. 180 COMAH Regulations, Part 3, Regulation 8 (1) (a)(b) and (c) (1999). 39

Chevron Richmond Refinery Regulatory Report October 2014

measures in place to control them.”181 According to HSE guidance on the offshore Safety Case Regulations, safety case reports are “intended to be living documents, kept up to date and revised as necessary during the operational life of the installation.”182 In order for the facility to begin operation or remain in operation, the regulator must “accept” 183 the facility’s safety case report; however, the regulator’s acceptance of a safety case does not license the facility or installation as “fit,”184 nor does it shift the duty of risk control and reduction away from the facility owner or operator and onto the regulator; rather, the duty of major accident prevention and risk reduction to ALARP remains with the duty holder throughout the life of the facility. Following the regulator’s acceptance of the safety case report, the duty holder must ensure that the installation is operated in conformity with the management system and other provisions described in the safety case.185 In the US, facilities commence operation before they are inspected or evaluated for complying with PSM or RMP regulations. In fact, the CSB has investigated incidents where the employer disputed that its process was covered by the PSM standard or RMP regulations. Regulators do not evaluate and approve PHAs or other hazard reviews and do not have the authority to license specific facilities for operation, based on the adequacy of their process safety programs. If an operating facility contains processes covered by the PSM standard, the facility must complete primarily activity-based regulatory requirements at least once every five years. The employer has no general duty to continually reduce risk. RMP- covered facilities must submit fairly high-level information exhibiting compliance with RMP requirements at least once every five years. While the regulator ensures the RMP has been filed and contains the required sections, there is no analysis of the effectiveness of controls identified in the RMP to mitigate hazards. 4.2 Continuous Risk Reduction to ALARP As discussed above, a majority of the safety case regimes implemented globally impose a duty on owners or operators of covered facilities on and offshore to reduce risks to ALARP or equivalent. The Center for Chemical Process Safety (CCPS) defines ALARP as “a risk reduction goal, where risk reduction efforts are continued until the incremental effort to further reduce risk becomes grossly disproportionate to the level of additional risk reduction.”186 This principle provides the regulator with the main foundation on 181 The Competent Authority. Revised guidance for operators of top tier COMAH establishments. Review and revision of COMAH safety reports. December 2009; p 5. http://www.hse.gov.uk/comah/report-review.pdf (accessed November 26, 2013). 182 HSE. A Guide to the Offshore Installations (Safety Case) Regulations 2005: Guidance on Regulations; 2006; p

  1. http://www.hse.gov.uk/pubns/priced/l30.pdf (accessed May 7, 2013).

183 “Acceptance requires satisfaction with the duty holder’s approach to identifying and meeting health and safety needs…HSE ‘accepts’ the validity of the described approach as being capable, if implemented as described, of achieving the necessary degree of risk control, but HSE does not confirm the outcomes of that approach.” Therefore, “HSE will accept a safety case or a revision…when duty holders demonstrate and describe specified matters to HSE’s satisfaction. Acceptance will be based on HSE’s judgment that the arrangements and measures described in the safety case taken as a whole are likely to achieve compliance if implemented as described. To give acceptance HSE does not need to be satisfied that compliance will be achieved.…” Ibid at 6. 184 TAF Powell, SPE, UK Health & Safety Executive. US Voluntary Semp Initiative: Holy Grail or Poisoned Chalice? Proceedings of the Offshore Technology Conference, Houston, Texas, May 8-9, 1996; p 8. 185 Ibid at 7. 186 Center for Chemical Process Safety (CCPS). Inherently Safer Chemical Processes – A Life Cycle Approach; 2nd ed., 2009; p 46. 40

Chevron Richmond Refinery Regulatory Report October 2014

which to accept or reject a safety case report. In essence, the regulator ultimately determines whether ALARP has been achieved through the authority to accept or reject the safety case report. An advantage of ALARP as opposed to a prescriptive or activity-based approach is that ALARP results in the continuous reduction of risk to keep up-to-date with advancing technology and industry best practices.187 Although two of the 14 PSM elements (PHA and mechanical integrity) contain performance-based or goal-setting requirements, 188 the PSM standard does not provide a specific risk reduction target such as ALARP. In reviewing the safety case report, the regulator may accept the application of relevant good practice as a sufficient demonstration of ALARP.189 As the HSE notes, “the measures in place to prevent or limit major accidents should be described in the safety report and be at least to ‘relevant good practice.’”190 According to Dr. Hopkins, the duty of ALARP “provides leverage for the regulator…[i]f an operator wishes to adopt a procedure or a standard that falls short of good or best practice, the regulator can reject it on the grounds that it does not reduce the risk as low as reasonably practicable.”191 As noted above, regulators such as HSE provide guidance on what is considered good practice, and publish documents containing good practice standards to assist operators with applying this concept. However, the duty holder must make the case for the standard or practice being utilized, and the regulator may determine that applying good practice alone is not sufficient to demonstrate that risks have been reduced to ALARP. In addition, if there is no directly applicable rule or standard, operators still have a duty to manage risk, and they therefore must maintain a reasonable level of risk awareness that goes beyond mere compliance.192 This raises a safety case regime above the compliance mentality of a more activity-based regime, such as PSM, and requires the duty-holder and the regulator to continuously ask whether there are other measures that would be effective in further reducing risks. The UK HSE provides ample guidance on determining what is considered to be ALARP, and many British courts have interpreted the concept as well. In the 1949 case Edwards v. National Coal Board, decided by the Court of Appeal, Judge Asquith wrote: ‘Reasonably practicable’ is a narrower term than ‘physically possible’ and seems to me to imply that a computation must be made by the 187 See http://www.hse.gov.uk/foi/internalops/hid_circs/permissioning/spc_perm_37/ (accessed December 9, 2013). 188 29 CFR §1910.119(e)(1) requires the employer to “identify, evaluate, and control the hazards involved in the process.” 29 CFR §1910.119(j)(5) states that “[t]he employer shall correct deficiencies in equipment that are outside acceptable limits (defined by the process safety information in paragraph (d) of this section) before further use or in a safe and timely manner when necessary means are taken to assure safe operation.” 189 HSE. Assessing compliance with the law in individual cases and the use of good practice; May 2003. http://www.hse.gov.uk/risk/theory/alarp2.htm (accessed June 12, 2013). 190HSE. Guidance on ALARP Decisions in COMAH. http://www.hse.gov.uk/foi/internalops/hid_circs/permissioning/spc_perm_37/ (accessed November 26, 2013). 191 Hopkins, Andrew. The Meaning of “Safety Case”; February 2013; p 6. 192 Hopkins, Andrew. The Meaning of “Safety Case”; February 2013; p 6. 41

Chevron Richmond Refinery Regulatory Report October 2014

owner, in which the quantum of risk is placed on one scale and the sacrifice involved in the measures necessary for averting the risk (whether in money, time or trouble) is placed in the other; and that if it be shown that there is a gross disproportion between them – the risk being insignificant in relation to the sacrifice – the defendants discharge the onus on them.193 While some critics in the US have argued that the determination of ALARP is strictly a quantitative risk assessment (QRA) calculation that is not sufficiently protective, the CSB has found that the HSE allows reliance upon qualitative assessments, QRA, and semi-quantitative risk assessments to determine ALARP.194 According to the HSE, essential considerations for determining whether a duty holder has reduced risks to ALARP include “the adoption of inherently safer designs…”195 and “[i]dentification of possible further measures that could be applied to lower the risk.”196 The HSE also notes that the guidance to COMAH Regulation 4 (General Duty) “describes the application of all measures necessary to reduce risk of a major accident to ALARP based on a hierarchical approach (inherent safety, prevention, control, mitigation).”197 In Norway, the PSA requires companies to “select technical, operational and organisational solutions that reduce the probability that harm, errors and hazard and accident situations occur.”198 PSA regulations require companies to choose the solutions that offer the best results, provided the costs are not significantly disproportionate to the risk reduction achieved.199 In Australia, the NOPSEMA enforces the Offshore Petroleum and Greenhouse Gas Storage Act 2006 and its regulations, which imposes a duty of care on the operator of a facility to “take all reasonably practicable steps” to ensure the facility is safe and all work and other activities are “carried out in a manner that is safe and 193 Edwards, [1949] 1 K.B. at 704. 194 Center for Chemical Process Safety (CCPS) guidance on risk assessment implies that as the predicted consequence of potential hazard scenarios increases, the level of analytical detail should also increase. Risk assessment approaches range in order of increasing analytical detail from qualitative, to semi-quantitative, to quantitative. Qualitative risk assessment is the simplest approach where judgments about consequence, likelihood, and the tolerability of risk are made on a subjective basis using the knowledge and experience of team members and may not be consistently applied within an organization. Semi-quantitative risk assessment is the second level of analytical detail, where organizations develop and provide to team members predetermined risk matrices and guidance for establishing numerical consequence and frequency levels. This approach is of greater value to team members as based upon their collective experience; the team typically has a sense of how frequently an event might occur and how great the potential consequence may be within the predetermined ranges. Layer of protection analysis (LOPA) is a semi-quantitative form of risk assessment, using order of magnitude categories for evaluating frequency, consequence, and adequacy of safeguards. Quantitative risk assessment involves the highest level of analytical detail and typically involves specialized expertise to perform. Complex models are commonly developed to evaluate frequency, consequence, and the effectiveness of safeguards in a quantitative risk assessment. Such approaches are typically standardized to minimize result variability within an organization and even between organizations in countries where a quantitative risk assessment is mandated by regulatory authorities. Center for Chemical Process Safety (CCPS). Guidelines for Developing Quantitative Safety Risk Criteria; August 2009. 195 HSE. The Safety Report Assessment Manual, Sections 8 to 15. p 30. http://www.hse.gov.uk/comah/sram/s8- 15.pdf (accessed October 30, 2013). 196 Ibid at 8. 197 Ibid at 8. 198 Regulations Relating to Health, Safety and the Environment in the Petroleum Activities and at Certain Onshore Facilities (The Framework Regulations). Section 11, Risk Reduction Principles. http://www.ptil.no/framework- hse/category403.html (accessed November 26, 2013). 199 Ibid. 42

Chevron Richmond Refinery Regulatory Report October 2014

without risk to the health of any person at or near the facility.”200 NOPSEMA explains that to achieve ALARP, the company “has to show, through reasoned and supported arguments, that there are no other practical measures that could reasonably be taken to reduce risks further.”201 In the US, the NRC has “gradually revised its original scheme, giving an increasing importance to the ‘economic and social factors’, in particular the involvement of all ‘stakeholders’ (authorities, management, staff, public) in the ALARA process.”202 For the regulator, the focus for whether ALARA has been achieved is on “processes, procedures, and judgments.”203 The duty holder must ensure that choices made to achieve ALARA are “fully documented together with the criteria which have brought to those choices. When the criteria are qualitative, it is more likely that subjective judgments play a large role, but those judgments must be equally recorded.”204 There is no corresponding duty to reduce risks to ALARP in the PSM standard or RMP program. Rather, these regulations require that facilities “control” identified hazards, with no further dialogue on how far the operator must go to control those hazards. Neither the facility nor the regulator is required to determine whether more could be done to control hazards or reduce risks to comply with these regulations, and this may result in the implementation of insufficient controls relating to a hazard. While OSHA and the EPA do rely on general duty standards when implementing the PSM standard and the RMP program, these duties do not drive onshore companies toward reducing the risks of their activities to ALARP, and instead are utilized as enforcement tools typically after an incident has occurred, meant to cover those activities not specifically regulated. These standards may also be used by OSHA or EPA to cite a company for not following a specific RAGAGEP for 2 of the 14 process safety elements - mechanical integrity and PSI. OSHA enforces section 5(a) of the Occupational Safety and Health Act (OSHAct), which states the following:

(a) Each employer – (1) shall furnish to each of his employees employment and a place of employment which are free from recognized hazards that are causing or are likely to cause death or serious physical harm to his employees; (2) shall comply with occupational safety and health standards promulgated under this act…205 Section 5(a)(1), also known as OSHA’s General Duty Clause, has been described as a “catch-all” provision meant to fill gaps in OSHA law for recognized unregulated hazards.206,207 In order for OSHA to 200 Offshore Petroleum and Greenhouse Storage Act 2006, Volume 3, Schedule 3, Clause 9. http://www.comlaw.gov.au/Details/C2012C00148/Html/Volume_3#_Toc315688204 (accessed October 30, 2013). 201 ALARP Guidance Note N-04-300-GN0166, Rev. 3 (Dec. 2011) available at http://www.nopsema.gov.au/assets/document/N-04300-GN0166-ALARP.pdf (accessed May 15, 2013). 202 Fasso, Alberto, and Rokni, S. Operational Radiation Protection in High Energy Physics Accelerators. Implementation of ALARA in Design and Operation of Accelerators. May 2009; p 6.

203 Ibid at 6. 204 Ibid at 6 and 7. 205 29 U.S.C. §654(a)(1) and (2) (2004). 206 Morrison, Kyle W. The General Duty Clause: What is it, how does OSHA use it and what should employers know? Safety + Health [Online]; May 1, 2011. 43

Chevron Richmond Refinery Regulatory Report October 2014

issue a General Duty Clause violation, the hazard must be recognized, the employer must have failed to keep the workplace free of the hazard to which his or her employees were exposed, a practical method must be available to correct the hazard, and the hazard must be causing or likely to cause death or serious injury.208 This duty would thus only apply if the absence or failure of one control in a series of controls makes an accident likely to occur (emphasis added). On the other hand, in a safety case regulatory regime, the regulator proactively reviews identified hazards and risk reduction strategies proposed by the operator to ensure that risks are being reduced to ALARP. The regulator may require the installation of an absent control if such a control is considered good industry practice, or if it goes further in reducing risks to ALARP. This is a key feature of the safety case approach in preventing major accidents. Under the CAA, the General Duty Clause requires owners and operators “to identify hazards which may result from such releases using appropriate hazard assessment techniques, to design and maintain a safe facility taking such steps as are necessary to prevent releases, and to minimize the consequences of accidental releases which do occur.”209 Similar to OSHA, the EPA can use its General Duty Clause enforcement authority to create legally binding requirements or enforce actions for hazards that have not been specifically regulated. The EPA can use this authority proactively (before an incident) or reactively (following an incident), and can enforce the clause where it finds the possibility of imminent and substantial endangerment.210 According to EPA guidance on the RMP program, because it is the owner or operator’s duty to “prevent accidents and ensure safety at [their] source…” this may require steps to be taken “beyond those specified in the risk management program rule.”211 While this principle appears to be similar to ALARP requirements of the safety case, in practice whether this is done is not subject to regulation or review. In addition, it is permissive in that it uses the word “may.” Nothing additional, such as ALARP, is required. This will be addressed below in more detail in the discussion of implementation of the EPA RMP program in California. 4.3 Adaptability and Continuous Improvement A key strength of the safety case regulatory regime is that it provides the regulator with the tools to drive continuous improvement among facilities and ensure risks have been reduced to ALARP or equivalent, rather than focusing on compliance with activity-based regulatory requirements. Although complying with good practice may achieve ALARP, the regulator also has the ability under this regime to require facilities to go above and beyond good practices and standards to achieve ALARP without requiring http://www.nsc.org/safetyhealth/Pages/5%2011%20The%20General%20Duty%20Clause.aspx (accessed June 5, 2013). 207 According to the National Safety Council, General Duty Clause violations make up only about 1.5 percent of total violations issued annually by OSHA. Available at http://www.nsc.org/safetyhealth/Pages/5%2011%20The%20General%20Duty%20Clause.aspx (accessed June 5, 2013). 208 Ibid. 209 42 U.S.C. §7412(r)(1) (1990). 210 42 U.S.C. §7412(r)(9) (1990). 211 EPA Office of Solid Waste and Emergency Response. General Guidance on Risk Management Programs for Chemical Accident Prevention (40 CFR Part 68); March 2009; p 7-7. http://www.epa.gov/osweroe1/docs/chem/Toc_final.pdf (accessed May 14, 2013). 44

Chevron Richmond Refinery Regulatory Report October 2014

rulemaking. The Baker Panel212 noted in its 2007 report (“the Baker Report”) on BP and its process safety performance following the 2005 BP Texas City disaster that an effective process safety management system builds upon an “improvement cycle” that “should include, in practice, continuous reduction of process risk and improvements in safety performance according to some measurable criteria.”213 The Baker Panel defined “continuous improvement” as • improving controls for process hazards, including process safety knowledge and competence of workers; • improving process safety leadership of supervisors; • improving process engineering to identify and then design to remove or mitigate the effects of process hazards; • going beyond legal compliance to best practices to reduce risks; • going beyond mere compliance with internal standards, but learning from operating experiences, incident and near miss investigations, hazard studies, audits, and other assessments to improve those internal standards; and • identifying and implementing not only those external standards that must be observed, but also those that represent best practices that can lead to process safety excellence.214 An independent review conducted of the Australian offshore safety case regime in 2000 echoes the importance of continuous improvement in process safety management, stating that “critical to the successful implementation of a safety case regime is the achievement of a qualitative shift in industry and regulatory safety cultures from the minimalist compliance of the prescriptive regime to the philosophy of best practice and continuous improvement.”215 Recently, Lord Cullen addressed the importance of adaptability as well, when he spoke at the 2013 Oil & Gas UK Piper 25 offshore safety conference in Aberdeen, Scotland.216 In his keynote speech, Lord Cullen quoted the Maitland panel, which examined the UK offshore safety regime after the Macondo incident, noting that “safety cases should be living documents [emphasis added] central to the way facilities are operated, with contents widely understood.”217 212 In the aftermath of the BP Texas City Incident, BP followed the recommendation of the CSB and formed an independent panel known as the Baker Panel to conduct a thorough review of the company’s corporate safety culture, safety management systems, and corporate safety oversight at its US refineries. For a copy of their findings and recommendations see http://www.bp.com/liveassets/bp_internet/globalbp/globalbp_uk_english/SP/STAGING/local_assets/assets/pdfs/Bak er_panel_report.pdf (accessed August 13, 2013). 213 Baker, J. The Report of the BP U.S. Refineries Independent Safety Review Panel, 2007; p 166. 214 Baker, J. The Report of the BP U.S. Refineries Independent Safety Review Panel, 2007; p 166. 215 Department of Industry, Science and Resources; Offshore Safety and Security, Petroleum and Electricity Division. Australian Offshore Petroleum Safety Case Review: Report of the Independent Review Team. 2000; p 33. 216 In June 2013, Oil & Gas UK held a large offshore safety conference in Aberdeen, which marked the 25th anniversary of the Piper Alpha disaster. For more information see http://www.oilandgasuk.co.uk/events/Piper25.cfm?frmAlias=/Piper25/ (accessed September 16, 2013). 217 Finding Petroleum. Review: Lord Cullen – what have we learned from Piper Alpha? September 16, 2013. http://www.findingpetroleum.com/n/Review_Lord_Cullen_what_have_we_learned_from_Piper_Alpha/044b5113.as px (accessed September 16, 2013). 45

Chevron Richmond Refinery Regulatory Report October 2014

As changes to regulatory requirements necessitate an extensive, lengthy rulemaking process in the US,218 process safety-related regulations can remain static for decades, while industry standards (many of which are voluntary under the current US system), technologies, and improved procedures and practices continue to change and advance, and new chemicals come into production. In light of major accidents that have occurred, such as the BP Texas City explosion and fire which resulted in 15 fatalities, and the Motiva Enterprises sulfuric acid tank explosion, which fatally injured one worker and injured eight others, the CSB has made a number of key recommendations to OSHA and the EPA to revise the PSM and RMP regulations, respectively. However, agencies have failed to implement these recommendations and these regulations have remained static despite the important lessons learned from these incidents. In addition, the OSHA PSM standard’s Appendix A, which contains a list of toxic and reactive highly hazardous chemicals and the threshold quantity for each, was originally created using a number of older sources, including the EPA’s “Extremely Hazardous Substance List,” the 1982 Seveso Directive, the 1984 CIMAH regulations, and others. A number of these sources have been revised, updated, and amended throughout the years, while Appendix A has not. In fact, no chemicals have been added to either the PSM or the RMP programs since the rules were initially adopted in the 1990s, even as numerous serious process incidents have occurred involving chemicals that were not listed. The U.S. Government Accountability Office (GAO) published a 2012 report on OSHA’s standard setting abilities, and noted that between 1981 and 2010, OSHA took anywhere from 15 months to 19 years to develop and issue 58 significant safety and health standards (averaging seven years).219 According to the report, OSHA reasoned that it must evaluate technological and economic feasibility of a potential standard using data gathered by visiting worksites in industries that will be affected, on an industry-by- industry basis.220 This was described as “an enormous undertaking because, for example, it requires visits to multiple worksites.”221 In addition, Executive Order 12866222 requires that federal agencies, including OSHA, provide an assessment of the potential overall costs and benefits for significant rules to the Office of Management and Budget (OMB). OSHA will typically be required under the Small Business Regulatory Enforcement Fairness Act of 1996223 to initiate a panel process to receive and consider input 218 5 U.S.C. Chapter 5, sections 511-599, also known as the Administrative Procedure Act, or APA, requires that federal agencies seeking to promulgate a rule or regulation submit to a lengthy notice and comment rulemaking process that includes publishing the proposed rule making in the Federal Register; providing the public with at least 30 days to participate in the rulemaking process by submitting written comments or data, and then discussing the public comments and providing a rationale for accepting or rejecting them. The OSHAct Section 6(b) specifies the procedures OSHA must use to promulgate, modify, or revoke its standards (29 U.S.C. §655(b)). These procedures include publishing the proposed rule in the Federal Register, providing interested persons an opportunity comment, and holding a public hearing upon request. 219 GAO. Workplace Safety and Health: Multiple Challenges Lengthen OSHA’s Standard Setting; April 19, 2012; p

  1. Available at http://gao.gov/assets/600/590210.pdf (accessed June 12, 2013).

220 Ibid at 6. The Supreme Court has held that the OSHAct requires that standards be both technologically and economically feasible. Am. Textile Mfrs. Inst. V. Donovan, 452 U.S. 490, 513 n. 31 (1981). Also see United Steelworkers v. Marshall, 647 F. 2d 1189, 1301 (D.C. Cir. 1980), quoted in AFL-CIO v. OSHA, 955 F. 2d 962, 980 (11th Cir. 1992). Assessing feasibility on an industry-by-industry basis requires that the agency research all applications of the hazard being regulated, as well as the expected cost for mitigating exposure to that hazard, in every industry. 221 Ibid at 6. 222 Exec. Order No. 12866, 48 Fed. Reg. 190 (September 30, 1993). http://www.whitehouse.gov/sites/default/files/omb/inforeg/eo12866/eo12866_10041993.pdf (accessed June 12, 2013). 223 5 U.S.C. §609(b), (d) (1996). 46

Chevron Richmond Refinery Regulatory Report October 2014

from representatives of affected small businesses, which could take eight months or more.224 Only OSHA, the EPA, and the Consumer Financial Protection Bureau are subject to this requirement.225 Finally, the OSHAct directs courts to review OSHA’s standards using a more stringent legal standard than the Administrative Procedure Act’s (APA’s) “arbitrary and capricious” test226 when reviewing OSHA’s standards;227 an OSHA standard may only be upheld if it is supported by “substantial evidence in the record considered as a whole.”228 According to the GAO report, OSHA officials claim this more stringent standard (known as the “substantial evidence” standard) requires a higher level of scrutiny by the courts and as a result, OSHA staff must conduct a large volume of detailed research in order to understand all industrial processes involved in the hazard being regulated, and to ensure that a given hazard control would be feasible for each process.229 The GAO also found that although OSHA has the ability to address urgent hazards by issuing emergency temporary standards, the agency has not used this authority since 1983 because of the difficult hurdles the agency faces in presenting the evidence necessary to meet the statutory requirements.230 In summary, all of these extensive rulemaking constraints have resulted in OSHA’s inability to undertake many standard revisions or improvements. In Spring 2013, OSHA announced its new regulatory agenda, which stated that one of the things OSHA plans to consider is revising the PSM standard to “address gaps in safety coverage.”231 Potential revisions include “expanding coverage and requirements for reactivity hazards,” which the CSB addressed in its 2002 report entitled “Improving Reactive Hazard Management,”232 and “expanding the scope of 224 GAO. Workplace Safety and Health: Multiple Challenges Lengthen OSHA’s Standard Setting; April 19, 2012; p

  1. Available at http://gao.gov/assets/600/590210.pdf (accessed June 12, 2013).

225 5 U.S.C. §609(d) (1996). 226 Pursuant to the APA, agency decisions may be set aside only if “arbitrary, capricious, an abuse of discretion, or otherwise not in accordance with law.” 5 U.S.C. §706(2)(A). There is abundant case law that discusses this standard. Courts have held that a court “may reverse under the arbitrary and capricious standard only if the agency has relied on factors that Congress has not intended it to consider, entirely failed to consider an important aspect of the problem, offered an explanation for its decision that runs counter to the evidence before the agency, or is so implausible that it could not be ascribed to a difference in view or the product of agency expertise. See Greater Yellowstone Coalition v. Lewis, 638 F. 3d 1143, 1148 (9th Cir. 2010) (as amended) (relaying on The Lands Council v. McNair, 537 F.3d 981, 987 (9th Cir. 2008) (en banc), overruled on other grounds by Winter v. Natural Res. Def. Council, 555 U.S. 7 (2008)). 227 GAO. Workplace Safety and Health: Multiple Challenges Lengthen OSHA’s Standard Setting; April 19, 2012; p

  1. http://gao.gov/assets/600/590210.pdf (accessed June 12, 2013).

228 29 U.S.C. §655(f). 229 GAO. Workplace Safety and Health: Multiple Challenges Lengthen OSHA’s Standard Setting; April 19, 2012; p

  1. http://gao.gov/assets/600/590210.pdf (accessed June 12, 2013).

230 OSHA must demonstrate that workers are exposed to grave danger and establish that an emergency temporary standard is necessary to protect workers from that grave danger. OSHA is also required to replace an emergency temporary standard with a permanent standard within six months using the requirements laid out in OSHAct 6(b). Ibid at 11. 231 See OSHA’s rulemaking abstract at http://www.reginfo.gov/public/do/eAgendaViewRule?pubId=201304&RIN=1218-AC82 (accessed September 17, 2013). 232 In this report, the CSB recommended to OSHA that it amend the PSM standard “to achieve more comprehensive control of reactive hazards that could have catastrophic consequences.” The report is available at http://www.csb.gov/assets/1/19/ReactiveHazardInvestigationReport.pdf (accessed September 17, 2013). The recommendations start on page 89 of the report. 47

Chevron Richmond Refinery Regulatory Report October 2014

paragraph (j) to cover the mechanical integrity of any safety-critical equipment….”233 However, OSHA has proposed changes to the PSM standard before, with no action ultimately being taken. On April 27, 1998, OSHA announced that it was considering issuing an Advance Notice of Proposed Rulemaking234 (ANPRM) “to address issues related to reactive chemicals raised by the explosion of a chemical plant in Lodi, New Jersey in 1995.”235,236 On May 14, 2001, OSHA clarified its intent to publish an ANPRM “to address the need to add reactive chemicals that are not currently covered by PSM…”237 On December 3, 2001, however, the entry on reactives was withdrawn from the rulemaking agenda.238 Following the devastating ammonium nitrate explosion on April 17, 2013, in West, Texas, which resulted in at least 14 fatalities and mass destruction in the town of West, CSB Chairperson Moure-Eraso urged both OSHA and the EPA to expand their standards to include reactive chemicals and hazards such as ammonium nitrate.239 On July 25, 2013, the CSB held a public meeting in Washington, DC to discuss the status of key open recommendations the CSB has made to OSHA over the last decade to revise its PSM standard and create a new combustible dust standard. These recommendations, which include revising the PSM standard to require MOC reviews for organizational changes such as mergers and acquisitions that may impact process safety, and ensuring PSM coverage for atmospheric storage tanks that could be involved in a potential catastrophic release, have stemmed from major CSB investigations including its BP Texas City, Motiva, ConAgra, Kleen, Imperial Sugar, and Hoeganaes investigations, as well as its Combustible Dust Study.240 OSHA’s failure to implement these recommendations, which can be attributed to its lack of rulemaking activities over the last decade, led the CSB to reclassify seven key open recommendations as “Open-Unacceptable.” The CSB also adopted the OSHA Combustible Dust Standard recommendation as a CSB “Most Wanted Chemical Safety Improvement.” OSHA formally responded and cited to the GAO report discussed above, noting that on average, it takes OSHA seven years to issue a standard, a process 233 See OSHA’s rulemaking abstract at http://www.reginfo.gov/public/do/eAgendaViewRule?pubId=201304&RIN=1218-AC82 (accessed September 17, 2013). 234 Most federal agencies develop rules through “informal rulemaking.” Under the Administrative Procedure Act, or APA, informal rulemaking requires a publication of a “Notice of Proposed Rulemaking” (NPRM) in the Federal Register; opportunity for public participation by submission of written comments; consideration by the agency of the public comments and other relevant material; and publication of a final rule not less than 30 days before its effective date, with a statement explaining the purpose of the rule. Under the APA, an agency may publish an Advance Notice of Proposed Rulemaking (ANPRM) when the agency wants to test out a proposal or solicit ideas before it drafts its NPRM. For more information see http://www.foreffectivegov.org/node/226 (accessed September 17, 2013). 235 See https://www.osha.gov/pls/oshaweb/owadisp.show_document?p_table=FEDERAL_REGISTER&p_id=13792 (accessed September 17, 2013). 236 This incident took place on Friday, April 21, 1995, at a chemical facility occupied by Napp Technologies. The explosion and fire resulted in five fatalities. 237 See https://www.osha.gov/pls/oshaweb/owadisp.show_document?p_table=FEDERAL_REGISTER&p_id=16776 (accessed September 17, 2013). 238 See https://www.osha.gov/pls/oshaweb/owadisp.show_document?p_table=FEDERAL_REGISTER&p_id=16946 (accessed September 17, 2013). 239 In a 2002 study entitled Improving Reactive Hazard Management, the CSB made recommendations to OSHA and the EPA to expand their regulations to include reactive chemicals and hazards. To date, neither agency has acted on the recommendations. See http://www.csb.gov/in-safety-message-csb-chairperson-rafael-moure-eraso- calls-for-regulatory-coverage-of-reactive-chemicals-following-the-west-fertilizer-explosion-and-fire-/ (accessed September 23, 2013). 240 For more information on this meeting, see http://www.csb.gov/events/csb-public-meeting-to-vote-on-key-safety- recommendations-and-initiate-most-wanted-program/ (accessed July 29, 2013). 48

Chevron Richmond Refinery Regulatory Report October 2014

that is only getting longer. Hence, OSHA reserves rulemaking for “widespread and serious hazards.” Needed petroleum refinery and chemical process safety improvements may never fall under this category. OSHA noted at the meeting that it would be utilizing a Request for Information241 (RFI) to aid in the revision of its PSM standard, aimed at addressing a number of issues that have developed in the 21 years since the PSM standard was promulgated in 1992. On December 9, 2013, OSHA published its RFI in the Federal Register.242 The RFI requests comment on potential revisions to OSHA’s PSM standard, among other regulations. The RFI identifies seventeen topics for potential rulemaking and enforcement changes, including clarifying the PSM exemption for atmospheric storage tanks and expanding PSM coverage and requirements for reactive hazards. The RFI also cites a number of CSB investigation reports and recommendations, including the CSB Reactive Hazard Study entitled Improving Reactive Hazard Management, the BP Texas City Investigation Report, and the Donaldson Enterprises, Inc., Investigation Report.243 Although the RFI is an important opportunity to enhance the dialogue on implementation of the safety case regulatory approach to enhance process safety management and risk reduction in the US, it does not specifically mention the safety case approach.244 On January 3, 2014, OSHA released a response to Section 6(a) of Executive Order 13650,245 which tasked the Chemical Facility Safety and Security Working Group, created by the Order and consisting of federal agencies such as OSHA, the EPA, and PHMSA,246 with considering options to improve chemical safety regulation. The document provides separate responses from each member agency of the group, and notes that the group is seeking public input on potential areas where standards could be improved. According to the document, three agencies – OSHA, the EPA, and PHMSA – have all included “[e]valuating the implementation of best practices and lessons learned such as the ‘safety case’ regulatory 241 An RFI is a tool used by a federal agency to help develop a proposed rule. Federal agencies generally use RFIs when they want public input on whether a new rule or changes to an existing rule are needed, and comments on what course the agency should take should it decide to move forward. More information available at http://www.dol.gov/regulations/participate.htm (accessed July 29, 2013). 242 78 Fed. Reg. 73756 (2013). 243 A full copy of the OSHA RFI is available at https://www.federalregister.gov/articles/2013/12/09/2013- 29197/process-safety-management-and-prevention-of-major-chemical-accidents (accessed January 7, 2014). 244 OSHA has released on its website a separate document responding to Executive Order 13650, Section 6(a) – Solicitation of Public Input on Options for Policy, Regulation, and Standards Modernization. OSHA states in this document that it is seeking public input on potential areas where it could improve its standards, and includes “[e]valuating the implementation of best practices and lessons learned such as the ‘safety case’ regulatory model to reduce risk in complex industrial processes” as an area to consider. https://www.osha.gov/chemicalexecutiveorder/Section_6ai_Options_List.html (accessed January 7, 2014). However, the safety case regulatory model is not mentioned in the RFI that was released for public comment. 245 This document is available at https://www.osha.gov/chemicalexecutiveorder/Section_6ai_Options_List.html (accessed January 7, 2014). 246 The Chemical Facility Safety and Security Working Group is co-chaired by the Secretary of Homeland Security, the Administrator of the EPA, and the Secretary of Labor. The Working Group must consist of the head or a designated representative of the Department of Justice, Department of Agriculture, and the Department of Transportation. The Working Group must also consult with representatives from the Council on Environmental Quality; the National Security Staff; the Domestic Policy Council; the Office of Science and Technology Policy; the Office of Management and Budget; the White House Office of Cabinet Affairs; and other agencies designated by the President. http://www.whitehouse.gov/the-press-office/2013/08/01/executive-order-improving-chemical-facility- safety-and-security (accessed January 13, 2014). 49

Chevron Richmond Refinery Regulatory Report October 2014

model to reduce risk in complex industrial processes” in a preliminary list of options to consider for improving chemical facility and safety.247 OSHA’s ability to adapt to process safety-related new or revised codes, standards, technology, and lessons learned is mainly limited to RAGAGEP requirements, which OSHA included in the mechanical integrity and PSI elements of its PSM standard in part to “provide flexibility for the employer to choose the frequency which would provide the best assurance of equipment integrity.”248 OSHA meant for RAGAGEP to include “both appropriate internal standards and applicable codes and standards.…”249 However, the concept of RAGAGEP only applies to 2 of the 14 PSM standard elements (mechanical integrity and PSI),250 only addresses equipment and mechanical integrity, and is usually utilized by OSHA as a mechanism to issue citations to companies post-incident. In addition, OSHA has had difficulty enforcing RAGAGEP citations. In a recent OSHA Review Commission proceeding, Secretary of Labor v BP Products North America, Inc., & BP-Husky Refining, LLC,251 and United Steelworkers Local 1-346, the Administrative Law Judge (ALJ) vacated OSHA RAGAGEP citations issued to BP for violations of 29 CFR §1910.119(d)(3)(ii)252 for failure to comply with a specific RAGAGEP, holding that OSHA impermissibly adopted a specific RAGAGEP, thereby diminishing the performance aspect of the RAGAGEP requirements contained within the OSHA PSM standard. The ALJ concluded that by citing to only one specific RAGAGEP, OSHA impermissibly adopted a prescriptive standard; in the ALJ’s view, OSHA should have acknowledged other possible RAGAGEPs for BP to comply with, including BP’s own internal standards. If upheld, this ruling may limit OSHA’s ability to utilize RAGAGEP as a means of requiring companies to implement industry good practices in the future.253 The cumbersome rulemaking process and lack of flexibility that has resulted in stagnant and static OSHA standards can be contrasted with the structure of the safety case regulatory regime, which facilitates adaptability and enables the regulator to improve industry safety performance and practices without requiring a major rule change. The safety case essentially provides the regulator with the tools to recognize more rigorous standards and practices that exist and drive a company to implement those practices to further reduce risks, as well as work with industry to improve existing standards and practices if necessary. It also enables companies to implement new, more efficient or safer technologies that do not necessarily meet strict prescriptive regulations, but that drive risk reduction. This adaptability is illustrated by the HSE’s recommendations following the 2004 Buncefield incident. On December 11, 2005, a number of explosions occurred at Buncefield Oil Storage Depot in Hemel Hemptstead, Hertfordshire, England following the overfilling of a gasoline tank. Over 40 people were injured and there was significant offsite damage to homes and businesses. An independently chaired Major Incident Investigation Board led by Lord Newton of Braintree was set up to investigate the incident. Between 2006 and 2008 the Board issued a number of reports and recommendations. In the 247 Ibid. 248 57 Fed. Reg. 6390-6391 (1992). 249 Ibid at 6390-6391. 250 29 CFR §§1910.119(d)(3)(ii) and (j)(4)(ii) and (iii). 251 BP Products North America, Inc. operates a refinery in Oregon, Ohio. BP-Husky is a joint venture with a business interest in the refinery. 252 29 CFR 1910.119(d)(3)(ii) requires the employer to document that equipment complies with RAGAGEP. 253The Occupational Safety and Health Review Commission is scheduled to review the decision. 50

Chevron Richmond Refinery Regulatory Report October 2014

report issued in March 2007 entitled “Recommendations on the design and operation of fuel storage sites,” the Board highlighted the adaptability of the existing regulatory regime by noting that the recommendations to improve standards and revise guidance should not require actual changes to the law, because the existing legal framework was “sufficient to ensure that necessary improvements are put in place.”254 The Board followed by making its first recommendation of the report to the COMAH CA and operators of Buncefield-type sites to develop and agree on a methodology to determine safety integrity level requirements for overfill prevention systems, which takes account of, among other things, nearby resources or populations.255 The Board also recommended that the sector “develop guidance to incorporate the latest knowledge on preventing loss of primary containment and on inhibiting escalation if loss occurs.”256 Another key recommendation was made to the CA to “ensure that safety reports submitted under the COMAH Regulations contain information to demonstrate that good practice in human and organisational design, operation, maintenance and testing is implemented as rigorously as for control and environmental protection engineering systems.”257 Finally, the Board recommended in this report that the “sector agree with the Competent Authority on a system of leading258 and lagging259 performance indicators for process safety performance…” based on HSE’s guidance on Developing process safety indicators.260 Spurred by recommendations made surrounding the Buncefield incident, the BP Texas City incident, and the BP Grangemouth incident,261 the COMAH CA developed an Operational Delivery Guide entitled “COMAH Competent Authority Workstream 2e: Process safety performance indicators,”262 which was “designed to continue the promotion and development of site level process safety performance indicators (PSPIs) as part of the monitoring arrangements for an effective process safety management system at major hazard sites.”263 The guide states that by the end of March 2013 all “Buncefield-type” sites would “have effective monitoring of process safety performance in place and that site specific leading and lagging performance indicators have been developed…”264 and that by the end of 2015 “all major hazard establishments and duty holders will measure their performance on the control of major hazard risks by way of key leading and lagging performance indicators.”265 It lays out in detail a six-step process for implementing a process safety measurement system; how inspectors will assess a duty holder’s 254 Buncefield Major Incident Investigation Board. Recommendations on the design and operation of fuel storage sites; March 2007; p 3. http://www.buncefieldinvestigation.gov.uk/reports/recommendations.pdf (accessed May 21, 2013). 255 Ibid at 8. 256 Ibid at 15. 257 Ibid at 19. 258 Leading indicators are measurements that predict future performance to ensure that safety protection layers and operating discipline are being maintained, including unsafe behaviors or insufficient operating discipline equipment selection, engineering design, specification of inspection frequency, and technique. See Center for Chemical Process Safety (CCPS), Guidelines for Process Safety Metrics; October 2009; p 20. 259 Lagging indicators are facts about previous events, such as process safety incidents, that meet the threshold of severity and should be reported as part of the process safety metric. Ibid at 20. 260 Ibid at 13. 261 Between May 29 and June 10, 2000, three incidents occurred at the BP Grangemouth Petrochemical Complex in Scotland, which is one of the largest of the 950 COMAH sites in the UK. 262 Available at http://www.hse.gov.uk/comah/guidance/process-safety-performance-indicators.pdf (accessed May 21, 2013). 263 COMAH Competent Authority, “Workstream 2e: Process safety performance indicators,” 2012; page 3. 264 COMAH Competent Authority, “Workstream 2e: Process safety performance indicators,” 2012; page 6. 265 Ibid at 3. 51

Chevron Richmond Refinery Regulatory Report October 2014

performance; and adds that full implementation of this program could take between 18 months and two and a half years from when the initial introduction takes place – all without requiring any fundamental changes to the COMAH regulations themselves. The COMAH CA Investigation Team noted in its publication summarizing the conclusions of the Buncefield investigation that following the incident, the CA, industry, and trade unions worked together to “drive forward high standards at fuel storage sites…[which] has resulted in agreement on improved standards of safety and environmental protection for all UK sites storing large volumes of gasoline and to systematically upgrade sites to meet these standards….”266 In another example following the Buncefield incident, the Board recommended significantly higher standards than were generally in place in the sector. For example, the Board recommended that fuel storage tanks be fitted with automatic overfill protection equipment that would cut off supply if an overfill event occurs, rather than continuing to rely on operators to interrupt flow manually in the case of an event. In response, the UK Petroleum Industry Association and the Tank Storage Association adopted the recommendation, and the British government announced that it would require all sites to move to fully automatic shutdown systems on tanks storing gasoline. The Process Safety Leadership Group (PSLG) was formed to help develop the details of the new rule, and to “meet the need for an effective framework for interaction between industry, trade unions and the COMAH Competent Authority (CA).…”267 As will be discussed in the next section, workforce involvement is a key element of an effective safety case regulatory regime. In 2009, HSE published the PSLG’s work in a document entitled Safety and Environmental Standards for Fuel Storage Sites. The document lays out precisely which tanks must utilize automatic overfill protection equipment, and also allows for duty holders to demonstrate technical reasons as to why automatic overfill protection would not be appropriate by “prepar[ing] a robust demonstration that alternative measures are capable of achieving an equivalent ALARP outcome to an overfill protection system that is automatic…”268 This document in essence was developed as an industry good practice, and compliance with its requirements would likely ensure that the duty holder is complying with the law and reducing risks to ALARP.269 This can be contrasted with an even larger release of gasoline and a subsequent explosion that occurred in the 2009 tank overfill at the Caribbean Petroleum Corporation near San Juan, Puerto Rico. This incident severely damaged surrounding buildings and impacted moving vehicles. However, the incident has not resulted in any re-evaluation of safety rules by the EPA or OSHA, despite the fact that tank terminals largely fall outside the PSM and RMP program regulations, (let alone the more rigorous requirements of a major hazard safety case regulatory regime, as practiced in the UK). These post-Buncefield examples highlight one of the most important attributes of the safety case regulatory approach: it is a regulatory framework that implements a balance of goal-setting and prescriptive elements which enable the regulator to drive facilities to continuously improve practices 266 The Competent Authority. Buncefield: Why did it happen? The underlying causes of the explosion and fire at the Buncefield oil storage depot, Hemel Hempstead, Hertfordshire on 11 December 2005; February 2011; p 3. http://www.hse.gov.uk/comah/buncefield/buncefield-report.pdf (accessed May 21, 2013). 267 Process Safety Leadership Group. Safety and environmental standards for fuel storage sites; London, 2009; p 7. http://www.hse.gov.uk/comah/buncefield/fuel-storage-sites.pdf (accessed August 1, 2013). 268 Ibid at 29. 269 For a detailed discussion of rule-compliance and the safety case, see Hopkins, Andrew. Risk-management and rule-compliance: Decision-making in hazardous industries; Safety Science 49 (1011) 110-120. 52

Chevron Richmond Refinery Regulatory Report October 2014

aimed at reducing risks to ALARP, without having to adhere to the extensive and time-consuming rulemaking requirements that exist in the US. This flexibility and adaptability encourages facilities to focus on improving practices and technology rather than on completing activity-based requirements, which can have the effect of stifling innovation and technological advancement. Critics argue that because there have been significant industry problems with the maintenance of safety critical equipment and aging equipment in the UK, 270 the safety case regime is not operating effectively. Regulators and commissions in the UK have found degradation of pipes, valves, and other equipment at many facilities due to company deferral of maintenance, insufficient testing of safety-critical elements, and a continuing industry culture of responding to disasters. However, the HSE has worked to make improvements to these areas. In 2010, the UK HSE initiated Key Programme 4 to address the issue of aging equipment offshore and the operation of installations beyond their design life.271 The same year, the HSE published a report intended to inform industry and aid in the prevention of major accidents entitled Managing Ageing Plant: A Summary Guide,272 which provides an overview of ageing plant mechanisms and their management. This document presents analysis and findings for loss of containment incidents to demonstrate how aging plant equipment may be a factor. The HSE has been able to take this type of programmatic proactive approach in the UK thanks to the safety case regime’s adaptive nature, which is lacking in the US both on and offshore. This is positive evidence of a competent and effective regulator with the tools under the safety case regime to identify and proactively address industry gaps in safety performance. 4.4 Active Workforce Participation As the CSB noted in its Interim Report on the Chevron incident, workforce participation is a key element of process safety and effective major accident prevention. In one of its publications, the Center for Chemical Process Safety (CCPS) lists workforce involvement as one of 20 essential management components necessary to reduce process safety risks and prevent chemical accidents.273 According to CCPS, …workers are potentially the most knowledgeable people with respect to the day-to-day details of operating the process and maintaining the equipment and facilities and may be the sole source for some types of knowledge gained through their unique experiences. Workforce involvement provides management a mechanism for tapping into this valuable expertise.274 This CCPS publication discusses general areas of workforce involvement in risk assessments, inspections, audits, and performance reviews, and notes that participation leads to empowerment, management 270 The HSE published a report to communicate the results and conclusions of the Asset Integrity Key Programme carried out between 2004 and 2007 by the Health and Safety Executive’s Offshore Division. See http://www.hse.gov.uk/offshore/kp3.pdf, (accessed August 28, 2013). 271 The UK launches Key Programmes to address poor performance in specific areas. Access the report entitled Key Programme 4 (KP$): Ageing and life extension at http://www.hse.gov.uk/offshore/ageing/kp4-interim-report.pdf (accessed November 1, 2013). 272 See http://www.hse.gov.uk/research/rrpdf/rr823-summary-guide.pdf (accessed November, 1, 2013). 273 CCPS. Guidelines for Risk Based Process Safety; March 2007; p liv. 274 Ibid at 124. 53

Chevron Richmond Refinery Regulatory Report October 2014

responsiveness, and process safety performance improvement. 275 The OSHA PSM standard requires employers to consult with employees and their representatives on the conduct and development of PHAs and on the development of the 13 remaining PSM elements, and to develop a written plan of action regarding the implementation of the employee participation required under this section.276 During facility inspections, OSHA inspectors must request and evaluate these written plans of action regarding the implementation of employee participation as well as interview employees and their representatives to verify that the employer is satisfying the requirements.277 In previous investigation reports, the CSB has identified that workers and their representatives play a very important role in major incident prevention. For example, as will be discussed in the next section on performance indicators, the CSB recommended in its BP Texas City Final Investigation Report that BP and the United Steelworkers Union (USW) establish a joint program to report incidents and near misses, and to ensure that recommendations made during investigations were implemented. The CSB also recommended that API and the USW work together to develop a safety standard addressing leading and lagging process safety indicators.278 However, representatives from the USW have stated to the CSB that it is a constant struggle for workers and their representatives to have a voice or play a role in the management of safety in US petroleum refineries. The law in the UK also requires employers to consult with their employees or their safety representatives on health and safety matters. The Safety Representatives and Safety Committees Regulations 1977 and the Health and Safety (Consultation with Employees) Regulations 1996 set out the legal framework for such consultation and worker involvement at both unionized and non-unionized onshore facilities.279 However, these regulations go further than the OSHA PSM standard in that they provide for the election of safety representatives by the workers to serve many health and safety-related functions, including investigating complaints and accidents and carrying out inspections. In his keynote speech at the Oil and Gas UK Piper 25 conference, Lord Cullen stated that the safety representative positions have “important functions, such as the power to carry out investigations and reporting safety concerns to management, without fear of recrimination,” noting that they “help[] reinforce the principle that each employee is responsible for his own safety.”280 The regulations also require employers to establish a safety committee when one is requested by at least two health and safety representatives. The 1996 regulations require employers to consult with employees not represented by safety representatives under the 1977 275 Ibid at 125. 276 29 CFR §1910.119(c) (2012). 277 See OSHA CPL 02-02-045. Process Safety Management of Highly Hazardous Chemicals – Compliance Guidelines and Enforcement Procedures. September 13, 1994. https://www.osha.gov/pls/oshaweb/owadisp.show_document?p_id=1558&p_table=directives (accessed September 6, 2013). 278 Process safety indicators are also referred to as safety performance indicators, metrics, key process indicators, performance measures, indicators, etc… 279 The 1977 regulations apply to workplaces where the employer recognizes trade unions and trade unions are recognized for collective bargaining purposes. Regulations available at http://www.legislation.gov.uk/uksi/1977/500/contents/made (accessed September 4, 2013). The 1996 regulations apply to workplaces where employees are not in a trade union and/or the employer does not recognize the trade union, or the trade union does not represent those employees not in the trade union. Regulations available at http://www.legislation.gov.uk/uksi/1996/1513/contents/made (accessed September 4, 2013). 280 Finding Petroleum. Review: Lord Cullen – what have we learned from Piper Alpha? September 16, 2013. http://www.findingpetroleum.com/n/Review_Lord_Cullen_what_have_we_learned_from_Piper_Alpha/044b5113.as px (accessed September 16, 2013). 54

Chevron Richmond Refinery Regulatory Report October 2014

Regulations on a number of health and safety-related matters, such as the introduction of any measure which may substantially affect their health and safety at work, the planning and organization of health and safety training, and the health and safety consequences of introducing new technology.281 The law in the UK protects employees from being penalized for taking part in health and safety consultation.282 The UK’s existing regulations and policies regarding worker involvement offshore were developed and strengthened as a result of the Piper Alpha incident. In the Piper Alpha Report, Lord Cullen emphasized the importance of workforce involvement in safe operations, and noted that a safety committee system is “the most visible instrument for the involvement of the workforce in safety.”283 He concluded by recommending that “the regulatory body, operators and contractors should support and encourage the involvement of the offshore workforce in safety.”284 The HSE developed guidance in response to Lord Cullen’s recommendations entitled Play your part! How offshore workers can help improve health and safety, intended to encourage workforce participation offshore.285 The most current version of this guidance document, which was prepared by the Workforce Involvement Group,286 located within the HSE’s Offshore Industry Advisory Committee,287 utilizes good practice and examples of successful workforce involvement in improving health and safety with the goal of assisting operators, contractors, safety representatives, and others in effectively utilizing workforce involvement in their workplaces. It encourages companies to facilitate workforce involvement by providing information, improving communication at all levels, good training, and ensuring that all workers are represented in the decisions that affect them.288 The Piper Alpha incident also resulted in the swift development of the SI971 Offshore Regulations (Safety Representatives and Safety Committees) Regulations 1989 (“the SI971 Regulations”), which provide for the nomination and election of safety representatives and require offshore installations to establish safety committees.289290 The HSE has published a guidance document entitled A guide to the 281 See HSE. Consulting employees on health and safety: A brief guide to the law; 2013. http://www.hse.gov.uk/pubns/indg232.pdf (accessed September 4, 2013). 282 See Employment Rights Act 1996. Section 44. Health and safety cases. http://www.legislation.gov.uk/ukpga/1996/18/section/44 (accessed September 4, 2013). 283 Department of Energy. The Public Inquiry into the Piper Alpha Disaster; Presented to Parliament by the Secretary of State for Energy by Command of her Majesty; November 1990; p 301. 284 Department of Energy. The Public Inquiry into the Piper Alpha Disaster; Presented to Parliament by the Secretary of State for Energy by Command of her Majesty; November 1990; p 392. 285 See HSE. Play your part! How offshore workers can help improve health and safety; 2013. http://www.hse.gov.uk/pubns/indg421.pdf (accessed June 17, 2013). 286 The Workforce Involvement Group’s mission is to improve safety “by stimulating lateral learning and best practice across the offshore industry through involvement of the whole workforce.” It looks at ways to increase worker involvement in health and safety matters offshore and is chaired by HSE. For more information see http://www.hse.gov.uk/aboutus/meetings/iacs/oiac/wig.htm (accessed June 17, 2013). 287 The Offshore Industry Advisory Committee is a tripartite committee that includes members representing employers, employees, unions, trade associations and other government departments. It is focused solely on the offshore sector. More information is available at http://www.hse.gov.uk/aboutus/meetings/iacs/oiac/information.htm (accessed June 17, 2013). 288 HSE. Play your part! How offshore workers can help improve health and safety; 2013; p 4. http://www.hse.gov.uk/pubns/indg421.pdf (accessed June 17, 2013). 289 Under Regulation 16, safety representatives are responsible for investigating potential hazards and incidents, examining causes of accidents, investigating complaints by any member of his or her constituency relating to occupational health and safety, representing members of the workforce in consultations on the offshore installation with inspectors, and consulting constituency members on any matters arising out of the Regulation. Under Regulation 17, a safety representative may inspect any part of the offshore installation or its equipment either on a 55

Chevron Richmond Refinery Regulatory Report October 2014

Offshore Installations (Safety Representatives and Safety Committees) Regulations 1989291 designed to assist duty holders, employers, installation managers, safety representatives, safety committee members and all members of the workforce in the offshore industry with what the regulations require and what must be done to comply with them. The document explains that although the primary responsibility for health and safety resides with the duty holder, “all members of the workforce must play their part if risks are to be eliminated or minimized.”292 It also emphasizes the importance of training of safety representatives, which enables them to effectively represent workers and fulfill their responsibilities and functions under these Regulations. In April 2010, the HSE launched an inspection project to examine the effectiveness of the SI971 Regulations and the effectiveness of those regulations, as well as to collect examples of best practice to present to the offshore industry.293 Forty-one inspections were completed in a six-month period on offshore installations operated by 25 different duty holders. The project helped focus on the power of safety representatives and how to strengthen their ability to effectively perform their duties. It also was well-received by the safety representatives, as it gave them encouragement and recognition, and sent a message to management on the importance of SI971 and the key role of safety representatives and committees in workplace health and safety. The HSE has placed great emphasis and importance on the role of worker involvement and consultation in improving workplace health and safety and reducing major accidents on and offshore. In June 2009, HSE launched a new strategy entitled Be part of the solution, which lists workforce involvement as one of its main priorities, and the agency has published a significant amount of guidance on worker involvement and consultation on its website.294 The Norwegian Working Environment Act addresses the rights and duties of safety representatives and committees in Norway. It applies to nearly all workers in Norway, including onshore and offshore oil workers. The Act provides for the election of government recognized safety representatives whose duty is to “safeguard the interests or employees in matters of the working environment.”295 These regular basis or following an incident. According to HSE, “this can be of great benefit to the duty holder because it brings an independent look at health and safety factors from the workforce viewpoint. Workers are in the front line and are often well placed to see problems and put forward practical suggestions.” HSE. A guide to the Offshore Installations (Safety Representatives and Safety Committees) Regulations 1989; 2012; p 20. http://www.hse.gov.uk/pubns/priced/l110.pdf (accessed September 4, 2013). 290 Under Regulation 22, safety committees are responsible for reviewing the system of constituencies so as to ensure adequate representation of the workforce on health and safety matters, reviewing training of safety representatives, reviewing the frequency of safety committee meetings and the circumstances under which they may be called, and considering causes of accidents and making recommendations to the installation manager. 291Third edition published in 2012. Available at http://www.hse.gov.uk/pubns/priced/l110.pdf (accessed September 4, 2013). 292 Ibid at 7. 293 See HSE. Offshore workforce involvement and consultation: Compliance Inspection Project. Available at http://www.hse.gov.uk/offshore/si971.pdf (accessed September 4, 2013). 294 See http://www.hse.gov.uk/involvement/hsrepresentatives.htm (accessed September 4, 2013). 295 Act Relating to Working Environment, Working Hours and Employment Protection, Etc. (Working Environment Act). December 2012. Section 6-1. Obligation to elect safety representatives. 56

Chevron Richmond Refinery Regulatory Report October 2014

representatives have the right to information, consultation, and participation in inspections.296 Unlike in the UK currently, they also have the legal authority to halt unsafe work until the regulator decides when the work may continue.297 A fundamental element in effective safety management for major accident prevention is active and equal participation from the regulator, industry, and labor. Each entity provides unique and essential insights, and removing the participation of these entities removes a critical voice in health and safety matters. In the UK and Norway, tripartite systems consisting of industry, the regulator, and the workforce have been established to deal with safety and health issues at the highest levels beyond just site workforce representation. The CSB investigation staff has had extensive discussions with worker representatives who have voiced their opinions on their systems to the CSB. Roy Furre, a Representative from the Norwegian Union of Energy Workers, spoke at the CSB’s 2010 public hearing on the Regulatory Approaches to Offshore Oil and Gas Safety, and stated that the Norwegian working environment and the accompanying petroleum regulations empower unions and safety delegates in all phases of the petroleum activities.298 He also noted that the Norwegian petroleum regulations require that all necessary information about risks and decisions be given to the workers’ representatives.299 During the CSB’s public hearing on Safety Performance Indicators in July 2012, Jake Molloy, the Regional Organizer for the National Union of Rail, Maritime and Transport Workers in the UK, stated that the input of workers is “crucial” in major accident prevention and that “if the people operating these systems and delivering these results are unable for any reason to tell you what the true picture is, everything else is worthless.”300 When speaking at a “Step Change for Safety” Conference in Aberdeen, Scotland, on September 5, 2012, Mr. Molloy noted that attending the public hearing in Houston was “eye opening” and that hearing about the US system was like a “walk back in time.”301

296 Ibid at Section 6-2. Duties of safety representatives. 297 Ibid at Section 6-3. The safety representative’s right to halt dangerous work. See also the Regulations Relating to Health, Safety and the Environment in the Petroleum Activities and at Certain Onshore Facilities (The Framework Regulations) Section 35. It states that “[t]he responsible safety delegate can, pursuant to Section 6-3 of the Working Environment Act, demand that a work operation or work process be halted by the person responsible for the operation or process. The operation or work shall stop immediately if the safety delegate does not accept the implementation of alternative measures.” http://www.ptil.no/framework-hse/category403.html#_Toc357595266 (accessed April 14, 2014).

298 CSB. Public Hearing: Regulatory Approaches to Offshore Oil and Gas Safety. December 15, 2010; p 300. http://www.csb.gov/assets/1/19/Transcript_of_Public_Meeting_12_15_2010.pdf (accessed December 10, 2013). 299 Ibid at 300. 300 CSB. Public Hearing: Safety Performance Indicators. July 23, 2013; p 143. http://www.csb.gov/assets/1/19/CSB_20Public_20Hearing.pdf (accessed December 10, 2013). 301 http://www.youtube.com/watch?v=-xDzb4x8t_c (accessed December 10, 2013). 57

Chevron Richmond Refinery Regulatory Report October 2014

  1. 5

Process Safety Indicators that Drive Performance As the CSB noted in both its July 2012 public hearing on Safety Performance Indicators and its Chevron Interim Report, leading and lagging process safety indicators help drive continuous process safety improvement, as long as regulators utilize these indicators to focus inspections, audits, and investigations, and organizations focus attention on them in a way that makes a difference. Process safety indicators are a significant element of process safety management systems. They measure the strengths and weaknesses of these systems to achieve and maintain safe and reliable operations302 and, if properly defined, collected and used, can identify the successes and flaws of the system.303 Lagging indicators are a “form of reactive monitoring”304 that includes events such as major spills, fires, or gas releases. Leading indicators, on the other hand, are a “form of active monitoring,”305 and are described as events that do not result in severe consequences and usually address safety system performance, such as deviations from safe operating limits or timely maintenance on safety critical equipment.306 Leading indicators “can be considered as measures of process or inputs essential to deliver the desired safety outcome.”307 The general thinking globally is that if companies rely primarily on lagging indicator data, which is retrospective, they are not effectively managing process safety to ensure major accidents are prevented. According to the HSE, “[t]oo many organizations rely heavily on failure data to monitor performance, so improvements or changes are only determined after something has gone wrong. Discovering weaknesses in control systems by having a major incident is too late and too costly.”308 Rather, facilities must identify critical controls to monitor and set leading indicators against each one to show that the system is operating as intended. The HSE was one of the earliest regulators to adopt process safety indicators regulations. In 1995, the agency began requiring companies to report health and safety data, and then published annual reports based on those statistics. In 2006, the HSE developed a step-by-step guidance document entitled Developing process safety indicators309 to assist industry. The guide establishes and discusses in detail six main steps necessary to implement a process safety measurement system, including developing leading and lagging indicators. It also defines leading and lagging indicators for each of the controls in the risk control system. According to Jake Molloy, “[i]t is our firm belief that the most influential and 302 CCPS. Guidelines for Process Safety Metrics; October 2009; p 109. 303 Ibid. 304 HSE. Developing process safety indicators: A step-by-step guide for chemical and major hazard industries; 2006; p 7. http://www.hse.gov.uk/pubns/books/hsg254.htm (accessed May 28, 2013). 305 Ibid. 306 Hopkins, Andrew. Disastrous Decisions: The Human and Organisational Causes of the Gulf of Mexico Blowout; CCH Australia Limited, 2012; p 83. 307 HSE. Developing process safety indicators: A step-by-step guide for chemical and major hazard industries; 2006; p 7. http://www.hse.gov.uk/pubns/priced/hsg254.pdf (accessed October 30, 2013). 308 Ibid at 1. 309 Full title is Developing process safety indicators: A step-by-step guide for chemical and major hazard industries; first published in 2006. http://www.hse.gov.uk/pubns/books/hsg254.htm (accessed May 28, 2013). 58

Chevron Richmond Refinery Regulatory Report October 2014

effective schemes using indicators to measure improvements and major accident prevention are those initiatives generated by our regulator, the Health and Safety Executive [HSE].”310 As discussed in the previous section, a number of large incidents, including BP Texas City and BP Grangemouth, have highlighted the need for the chemical and other major hazard sectors to demonstrate that risks are being adequately controlled. In response to recommendations stemming from such incidents, the COMAH CA developed an Operational Delivery Guide in 2010 on process safety performance indicators setting out four stages to aid facilities in the development of process safety indicators. The document sets out a goal that by the end of 2015 major hazard establishments and duty holders will measure their safety performance and control of risk by way of key leading and lagging performance indicators. Following the 2005 BP Texas City incident, BP developed company-wide process safety indicators, and now includes process safety metrics in performance contracts for its US refinery managers.311 However, existing guidance in the US pertaining to safety performance indicators does not adequately aid companies in managing major hazards onshore. The CSB has noted that in virtually every incident it investigates in the US, process safety indicators are either not used at all or not used effectively.312 Millions of workplaces around the US primarily measure their safety performance using OSHA recordable injury and illness rates, which include slips, trips, and falls. While collecting this type of data is also necessary in hazardous operations, it is not sufficient. Injury rates do not depict the effectiveness of a high hazard facility’s process safety management program.313 For example, the CSB noted in its BP Texas City investigation that BP’s personal injury metrics were described as being at the best level on record; yet, around this same time, in March 2005, BP Texas City experienced the devastating 15-fatality incident, which resulted from a progressive erosion of process safety performance that was not reflected in injury statistics. Following the BP Texas City incident, a number of key recommendations were made to strengthen guidance on indicators in the US. For example, the Baker Panel314 issued the Baker report, which recommended the incorporation of safety indicators to measure safety performance, and stated: The Panel believes that relying exclusively or predominantly on lagging indicators to assess process safety performance is ill-advised. … BP’s reliance on lagging, after-the-fact indicators of process safety performance rather than leading, predictive measures…impaired BP’s ability to measure, monitor and detect deteriorating or degraded process safety conditions and performance… This failure to use a set of effective performance metrics that includes leading indicators increased the 310 Molloy Testimony. CSB Indicators Public Hearing Transcript; July 24, 2012; p 139. 311 Hopkins, Andrew. Disastrous Decisions: The Human and Organisational Causes of the Gulf of Mexico Blowout; CCH Australia Limited, 2012; p 84. 312 Donald Holmstrom. CSB Indicators Public Hearing Transcript; July 24, 2012; p 13. 313 Ibid. 314 In the aftermath of the BP Texas City Incident, BP followed the recommendation of the CSB and formed an independent panel known as the Baker Panel to conduct a thorough review of the company’s corporate safety culture, safety management systems, and corporate safety oversight at its US refineries. For a copy of their findings and recommendations see http://www.bp.com/liveassets/bp_internet/globalbp/globalbp_uk_english/SP/STAGING/local_assets/assets/pdfs/Bak er_panel_report.pdf (accessed August 13, 2013). 59

Chevron Richmond Refinery Regulatory Report October 2014

likelihood that the organisation would identify the need for improvements or additional controls only after something had gone wrong.315 The Baker Panel also noted that it was not enough just to develop process indicators: these indicators needed to be meaningful to the company. As such, the Baker Panel also recommended that “a significant proportion of total compensation of refining line managers and supervisors [be] contingent on satisfactorily meeting process safety performance goals….”316 In its final investigation report on the incident, the CSB made a recommendation to API and the USW to jointly lead development of a consensus standard for leading and lagging process safety indicators to drive performance improvements in the prevention of major incidents. API responded by issuing RP 754, Process Safety Performance Indicators for the Refining and Petrochemical Industries. However, this voluntary standard, which defines a framework of four tiered indicators that incorporate the concepts of lagging to leading measures, has significant shortcomings, as the CSB described in a two-day public hearing on Safety Performance Indicators that was held in July 2012. The CSB analysis found that the ability of RP 754 to drive performance improvement and inform key stakeholders will be hampered by • lagging indicators with insufficient statistical rigor needed to allow for trending or incremental performance improvements; • the lack of well-defined standardized and normalized leading indicators that are needed for comparison among sites, corporations, or to national averages; • weak employee protection requirements; public reporting requirements that will be ineffective to adequately inform stakeholders; and • the lack of broadly based consensus in the standard’s development process.317 As a result, in 2012 the CSB Board designated the response to the CSB’s recommendation as “open- acceptable,”318 meaning that the recommendations recipient is moving in the right direction, but more remains to be done. The CSB also noted in the Chevron Interim Report the important role the public plays in monitoring safety management systems, and referenced CCPS as promoting the sharing of process safety indicators with the public: Sharing performance metrics and results broadly can engage the public as a partner in holding the organization accountable for process safety performance. Making metrics and performance public can be an especially powerful way of maintaining upper management commitment since it will likely be the CEO or other senior managers who will be called to account by the public if goals are not met or performance declines. Communicating process safety successes also demonstrates to 315 Baker, J. The Report of the BP U.S. Refineries Independent Safety Review Panel, 2007; p 194. 316 Ibid at 251. 317 CSB Public Hearing: Safety Performance Indicators. July 23-24, 2012; p 26. http://www.csb.gov/events/csb- public-hearing-safety-performance-indicators/ (accessed August 14, 2013). 318 For more information on recommendations status designations, see http://www.csb.gov/recommendations/faq/#5 (accessed June 21, 2013). 60

Chevron Richmond Refinery Regulatory Report October 2014

employees and the public that positive change can be, and are being, made within an organization.319 The Petroleum Safety Authority (PSA) in Norway provides annual reports to the public on its website assessing indicators it has collected directly from offshore and onshore major hazard facilities since 2000 and 2006, respectively. The PSA utilizes the indicators data found in these reports to identify critical safety areas that must be targeted for improvement in order to prevent near misses and accidents.320 The onshore report, Risk level in the petroleum industry, Onshore facilities,321, 322 includes a description and explanation of the indicators collected and analysis of these data. In this report the PSA notes a decreasing trend in the number of reported hydrocarbon leaks on offshore production facilities between 2007 and 2010.323 However, it is too soon for PSA to assess trends in the onshore indicators data, because the time period for onshore data collection has been relatively short and there are fewer data points with only eight facilities onshore. The PSA also indicated that it will take time for the onshore data to improve as indicators are refined, but recognized that the same approach has already yielded good results in the offshore sector.324 Additional information on data and trends based on safety case regime implementation are provided in Appendix C.

319 Center for Chemical Process Safety (CCPS). Guidelines for Process Safety Metrics. 2010; p 109. 320 PSA. Trends in Risk Level: Summary Report 2012 – Norwegian Continental Shelf. 2012; p 1. 321 The CSB had the 2010 version of the onshore report translated into English. http://www.ptil.no/getfile.php/PDF/RNNP_2012/Trends%20in%20risk%20level_2012.pdf (accessed September 17,

  1. (accessed September 17, 2013).

322 The corresponding report discussing offshore indicator data is entitled Trends in Risk Level. http://www.ptil.no/getfile.php/PDF/RNNP_2012/Trends%20in%20risk%20level_2012.pdf (accessed September 17, 2013. 323 PSA. Risk level in the petroleum industry, Onshore facilities. 2010; p 80. 324 Ibid. 61

Chevron Richmond Refinery Regulatory Report October 2014

  1. 6

Regulatory Assessment, Verification, and Intervention To effectively oversee covered facilities and enforce safety case regulations, technically competent regulators review and assess325 safety case reports and utilize preventative inspections and audits to effectively intervene before high-risk activities commence. According to the HSE, “[t]he assessment process is only a part of the COMAH regime and examines at face value the factual information and examines arguments and demonstrations contained in the report against the requirements of the regulations.”326 The HSE places great emphasis during the assessment phase on the adoption of inherently safer designs327 and notes that “[m]ajor accident hazards should be avoided or reduced at source through the application of principles of inherent safety.”328 Conclusions on the adequacy of the safety case report are developed at the end of the assessment process, and, if deficiencies are found, an intervention strategy for the facility is developed to addresses those deficient measures. According to the HSE, assessment of a safety case report or document “is not a discrete activity but leads to further action under the intervention plan for the operator at that establishment.”329 Intervention by the regulator ensures that the facility and its operations are consistent with information provided in the safety case report, and that there are robust systems in place to “reduce the likelihood of hazards and to mitigate their consequences until the associated risks are ALARP.”330,331 Under the safety case regulatory regime, the regulator has the authority to accept the safety case report or reject it and require additional measures to further reduce risks. Preventative inspections and audits by a technically competent regulator can also result in deep challenges to industry, which does not typically happen under the PSM or RMP regulations. In the UK, the COMAH regulations authorize the CA to

325 According to the HSE, the “assessment reviews the documentary evidence in the report and further documentation, as appropriate, which is referred to in the report or requested by the assessor.” HSE. The Safety Report Assessment Manual, Sections 2 to 7. p 3. http://www.hse.gov.uk/comah/sram/s2-7.pdf (November 26, 2013). 326 HSE. The Safety Report Assessment Manual, Sections 8 to 15. p 9. http://www.hse.gov.uk/comah/sram/s8- 15.pdf (accessed October 30, 2013). 327 Ibid at 30. 328 HSE. The Safety Report Assessment Manual, Sections 2 to 7. p 3. http://www.hse.gov.uk/comah/sram/s2-7.pdf (November 26, 2013). 329 HSE. The Safety Report Assessment Manual, Sections 8 to 15. p 4. http://www.hse.gov.uk/comah/sram/s8- 15.pdf (accessed October 30, 2013). 330 HSE. The Safety Report Assessment Manual, Sections 8 to 15. p 30. http://www.hse.gov.uk/comah/sram/s8- 15.pdf (accessed October 30, 2013). 331 According to HSE, essential considerations to ensure ALARP are “the scope of hazard elimination, the adoption of inherently safer designs, whether good practice has been, or is to be adopted, [and] the application of risk- reducing measures where relevant good practice is not yet established.” Ibid at 30 and 31. 62

Chevron Richmond Refinery Regulatory Report October 2014

organize an adequate system of inspections of establishments or other measures of control appropriate to the type of establishment concerned…[that are] sufficient for a planned and systematic examination of the systems being employed at the establishment, whether of a technical, organisational or managerial nature, so as to ensure…(a) that the operator can demonstrate that he has taken appropriate measures to prevent major accidents; (b) that the operator can demonstrate that he has provided appropriate means for limiting the consequences of major accidents both inside and outside the establishment; (c) that the information contained in any report sent to the competent authority by the operator of the establishment adequately reflects the conditions in the establishment…332 The CSB noted in its BP Texas City Final Investigation Report that in the UK, HSE inspectors thoroughly inspect high hazard facilities annually, and all COMAH-covered facilities are inspected every five years. For the approximately ten petroleum refineries in the UK, detailed planned inspections (ranging from 80 to 150 days) are conducted annually for each refinery by a multidisciplinary team (regulatory inspectors, process safety, mechanical engineering, electrical and instrumentation, and human factors specialists).333 The HSE lists its offshore priorities as safety case assessment;334 verification;335 inspection; investigation; and enforcement.336 In its business plan for 2012-2015, the HSE set out a goal of assessing 72 safety cases onshore and 100 safety cases offshore for 2013 and 2014.337 The work required to assess a safety case report both on and offshore is very resource-intensive (a typical new offshore safety case assessment requires anywhere from 100 to 300 hours of work), and demands that the regulator hire and retain individuals with significant oil and gas experience, specifically in areas such as process safety, human factors, engineering, and organizational performance. In Australia, the Offshore Petroleum and Greenhouse Gas Storage Act 2006 authorizes NOPSEMA to conduct planned inspections of offshore installations to ensure compliance with the Act.338 NOPSEMA notes that planned inspections “are a critical examination of aspects of a facility, its systems and 332 COMAH Regulations 1999 Part 6, Regulation 19(1) and (2). 333 The CSB. Investigation Report: BP Texas City Refinery Explosion and Fire. March 2007; p 205. http://www.csb.gov/assets/1/19/CSBFinalReportBP.pdf (accessed October 29, 2013). 334 An owner or operator (i.e. the duty holder) is required to submit a safety case to HSE for each offshore installation. HSE then assesses the safety case using both regulations and HSE’s “Assessment Principles for Offshore Safety Cases (APOSC) and must accept it before an installation can operate. See http://www.hse.gov.uk/offshore/aposc190306.pdf (accessed July 31, 2013). 335 Duty holders have a duty under the Offshore Installations (Safety Case) Regulations 2005 to put in place and keep under continual review a verification scheme by which assurance is obtained from an independent competent person (ICP) that safety critical elements and the PFEER (Offshore Installations (Prevention of Fire and Explosion, and Emergency Response) specified plant are suitable and remain suitable for the life of the installation. For more information see http://www.hse.gov.uk/offshore/verification.htm (accessed July 31, 2013). 336 See http://www.hse.gov.uk/offshore/priorities.htm (accessed July 15, 2013). 337 HSE. HSE Business Plan 2012-15; June 2012; p 14. http://www.hse.gov.uk/aboutus/strategiesandplans/businessplans/plan1215.pdf (accessed June 3, 2013). 338 Offshore Petroleum and Greenhouse Gas Storage Act 2006, Sections 600 and 601. See http://www.comlaw.gov.au/Series/C2006A00014 (accessed July 15, 2013). 63

Chevron Richmond Refinery Regulatory Report October 2014

operations with information obtained from the facility safety case.”339 Subjects of planned inspections include risk control measures related to either a Major Accident Event340 or Occupational Health and Safety controls, or both. NOPSEMA states that it conducts at least two per year for each normally manned offshore installation.341 NOPSEMA distinguishes between two types of planned inspections: field-based inspections, which focus on implementation of control measures described in a facility’s safety case, and themed audits, which deal with inspection of organizational issues by following a common theme to direct lines of questioning.342 In a 1992 compliance directive,343 OSHA stated that the primary enforcement model for the PSM standard would be planned, comprehensive, and resource-intensive Program Quality Verification (PQV) inspections.344 These inspections consist of three parts: determining if the elements of a PSM program are in place; evaluating if the programs comply with the requirements of the standard; and verifying compliance with the standard through interviews, data sampling, and field observations. However, OSHA does not make planned inspections, which have the most opportunity for prevention, a high priority. Rather, OSHA lists its inspection priorities as 1) imminent danger situations; 2) fatalities and catastrophes; 3) complaints; 4) referrals; 5) follow-ups; and 6) planned inspections.345 The CSB noted in its BP Texas City Final Investigation Report that for the 10-year period prior to the Texas City incident, federal OSHA had conducted no planned PQV inspections in oil refineries. As a result, CSB recommended in its report that OSHA strengthen the planned enforcement of the OSHA Process Safety Management (PSM) standard by developing more highly trained and experienced inspectors to conduct more comprehensive inspections, such as the PQV audits envisioned in the 1992 directive, at facilities presenting the greatest risk of a catastrophic accident. The intent of the recommendation was to establish a permanent, ongoing planned comprehensive inspections program. Spurred in part by the CSB’s recommendations, OSHA issued the Petroleum Refinery Process Safety Management National Emphasis Program (NEP) on June 7, 2007.346 The NEP was a federal program that established guidelines for inspecting petroleum refineries to assure compliance with the PSM standard. Unlike the PQV approach to inspections, which “employs a broad, open-ended inspection strategy and uses a more global approach to identify compliance deficiencies…,” the NEP “provide[d] a specific tool to evaluate compliance with the [PSM] standard…[which] identifies a particular set of requirements from the PSM standard from which CSHOs [Compliance Safety and Health Officers] are to review documents, 339 NOPSEMA. Inspection Policy; p 2. http://www.nopsema.gov.au/assets/document/N-02000-PL0025- Inspection.pdf (accessed July 15, 2013). 340 Australia’s Offshore Petroleum and Greenhouse Gas Storage Regulations 2009 define a Major Accident Event as “an event connected with a facility, including a natural event, having the potential to cause multiple fatalities of person at or near the facility.” Chapter 1.5. See http://www.comlaw.gov.au/Details/F2009L04578/Html/Text#param5 (accessed July 15, 2013). 341 For more information, see http://www.nopsema.gov.au/safety/inspections/ (accessed July 15, 2013). 342 For more information, see http://www.nopsema.gov.au/assets/document/N-02000-PL0025-Inspection.pdf (accessed July 15, 2013). 343 Compliance directives are the main method OSHA uses to communicate plans, inspection methods, and compliance expectations to their Compliance Safety and Health Officers (CSHOs) for enforcing a new regulation. 344 OSHA Instruction CPL 02-02-045 (1994). 345 “OSHA Fact Sheet: OSHA Inspections,” available at http://www.osha.gov/OshDoc/data_General_Facts/factsheet-inspections.pdf (accessed on May 20, 2013). 346 Originally Directive Number CPL 03-00-004. Extended August 18, 2099 as Directive Number CPL 03-00-010 to allow more time to complete NEP inspections under the original CPL 03-00-004. 64

Chevron Richmond Refinery Regulatory Report October 2014

interview employees, and verify implementation for specific processes, equipment, and procedures.”347 The NEP inspections were meant to be more targeted and efficient than PQV inspections. However, the inspections being conducted pursuant to the NEP were ended in 2011 partly because they were very time- consuming and resource-intensive.348 OSHA has publicly stated349 that NEP inspection hours were roughly 40 times greater than average OSHA inspection hours. OSHA described the NEP as its most effective emphasis program in its history, citing a disturbing number of issues and subsequent citations. In 1999, EPA established an audit350 program to help ensure compliance with the RMP program. The audits were intended to provide an independent verification of the information in the RMP and include on-site inspections. Under these requirements, the implementing agency (EPA or a correlating state agency) must “periodically audit” RMPs to review their adequacy and require revisions when necessary to ensure compliance. 351 Between fiscal years (FYs) 2010 and 2012, each EPA Region responsible for implementing the RMP program was mandated by EPA to perform inspections352 at five percent of the total number of regulated facilities in the regions, and a certain percentage of these facilities were required to be high-risk.353 In FY 347 CPL 03-00-004, Section X(D)(1). 2007. 348 Jordan Barab, Deputy Assistant Secretary of Labor for Occupational Safety and Health, stated the following during a symposium at the Mary K O’Connor Process Safety Center: “As our refinery NEP comes to an end, we are engaged in a process of trying to figure out how we will address refinery PSM issues in the future. Clearly OSHA's past practice of targeting inspection according to injury and illness numbers is not adequate. However, because of resource limitations, we are also unable to commit to a full-time NEP.” “Saving Lives and Transforming Workplaces: OSHA and Process Safety.” Remarks for Jordan Barab, Deputy Assistant Secretary of Labor for Occupational Safety and Health. Mary Kay O’Connor Process Safety Center International Symposium. Texas A&M University, College Station, Texas. Wednesday, October 27, 2010. https://www.osha.gov/pls/oshaweb/owadisp.show_document?p_table=SPEECHES&p_id=2311 (accessed January 13, 2014). 349 See Barab, Jordan. OSHA’s Refinery & Chemical National Emphasis Programs. Power Point presentation made at CSB Public Hearing on Process Safety Indicators; July 20, 2012. http://www.csb.gov/UserFiles/file/Barab%20%28OSHA%29%20PowerPoint.pdf (accessed August 14, 2013). Also see Transcript of CSB Public Hearing on Safety Performance Indicators; p 52. http://www.csb.gov/assets/1/19/CSB_20Public_20Hearing.pdf (accessed August 14, 2013). 350 Within Part 68, the term “audit” refers to the process that implementing agencies may use to verify the quality of the RMP submitted to EPA and require revisions when necessary to ensure compliance. RMP audits will generally involve on-site verification of a facility’s underlying risk management program. Section 68.220 of the RMP rule requires implementing agencies to select facilities for audits based on specific criteria, and to follow a specific process for resolving audit findings prior to any enforcement action. See EPA. Guidance for Conducting Risk Management Program Inspections under Clean Air Act Section 112(r); January 2011; p 4. Available at http://www.epa.gov/osweroe1/docs/chem/clean_air_guidance.pdf (accessed June 11, 2013). 351 40 CFR §68.220 (1999). 352 RMP inspections “are different from audits in that facilities are not necessarily selected for inspection based on Part 68 regulatory criteria, and inspections can lead directly to implementing agency enforcement actions for regulatory violations. Also, RMP inspections always involve on-site verification activities.” See EPA, “Guidance for Conducting Risk Management Program Inspections under Clean Air Act Section 112(r).” January 2011; page 4. Available at http://www.epa.gov/osweroe1/docs/chem/clean_air_guidance.pdf (accessed June 11, 2013). 353 Criteria used to determine high-risk includes the number of people in the footprint (if it is more than 100,000); accidental releases reported in the RMP; the hazard index (percentage of chemical quantity above threshold and number of chemicals onsite); and the number of Program Levels 2 or 3. US EPA Region 9 Emergency Prevention and Preparedness Program; Stanislaus County Powerpoint; March 2013. See http://www.condorearth.com/files/08- Enforcement_Priorities-Mary_Wesling.pdf (accessed May 14, 2013). 65

Chevron Richmond Refinery Regulatory Report October 2014

2010, regions were to conduct 10 percent of the inspections at high-risk facilities, and in FYs 2011 and 2012, 25 percent at high-risk facilities.354 Although EPA has acknowledged that “full compliance with the Risk Management Program regulations cannot be determined without on-site or independent verification of all or part of the information submitted in an RMP[,]”355 the EPA has not effectively implemented the audit and inspection elements of the Risk Management Program. As mentioned above in Section 3.2.2.3.2, the EPA Office of Inspector General (OIG) concluded in 2009 that over half of the RMP-covered facilities identified in the US as high-risk356 had never received an on-site inspection or audit, and over 65 percent of all active RMP facilities had not received an on-site inspection or audit since inception of the RMP program in 1999.357 The EPA OIG also noted that of the 296 uninspected high-risk facilities managed by EPA, 151 of these could each impact 100,000 people or more in a worst-case accident scenario.358 4.7 Independent, Competent, Well-Funded Regulator As noted by NOPSEMA, a safety regulator “provides ‘independent’ assurance to society, governments and industry that companies have identified the risks to health and safety and have put appropriate measures in place to control these risks.”359 To ensure that companies are managing risks and employing the best available standards and technologies, the regulator must be independent,360 well-resourced, and retain a sufficient number of technically competent, experienced, and well-trained staff that can critically assess companies’ safety case reports and performance. Without independent and competent examinations, the safety case report becomes a meaningless document in terms of controlling risk and preventing major accidents. Offshore regulators in the UK and Australia also utilize independent third party specialist safety companies recognized by the regulator. Third party inspectors review important aspects of the safety case, such as safety critical elements361 and performance standards.362 Third party inspections, however, do not take the place of rigorous inspections by the regulator. 354 EPA OIG. Improvements Needed in EPA Training and Oversight for Risk Management Program Inspections; March 21, 2013; p 7. http://www.epa.gov/oig/reports/2013/20130321-13-P-0178.pdf (accessed June 11, 2013). 355 EPA. Guidance for Conducting Risk Management Program Inspections under Clean Air Act Section 112(r); January 2011; p 4. http://www.epa.gov/osweroe1/docs/chem/clean_air_guidance.pdf (accessed June 11, 2013). 356 A high-risk facility is one that meets one of more of the following characteristics established by the EPA Office of Emergency Management: 1) Facilities whose reported RMP worst-case scenario population exceeds 100,000 people; 2) Any RMP Program facility with a hazard index greater than or equal to 25; and/or 3) Facilities that have had one or more significant accidental releases within the previous five years. See “EPA Office of Inspector General, “Improvements Needed in EPA Training and Oversight for Risk Management Program Inspections.” March 21, 2013; Page 5. Available at http://www.epa.gov/oig/reports/2013/20130321-13-P-0178.pdf (accessed June 11, 2013). 357 EPA OIG. Evaluation Report: EPA Can Improve Implementation of the Risk Management Program for Airborne Chemical Releases; February 10, 2009; p 15. 358 Ibid. 359 See http://www.nopsema.gov.au/safety/safety-case/safety-case-approach/ (accessed May 31, 2013). 360 You will find a more detailed discussion of regulator independence in the CSB’s upcoming investigation report on the Macondo incident. 361 The UK HSE requires offshore installations to define “safety critical elements,” which are the technical barriers in place for the prevention, detection, control, and mitigation of major accident risks. Lauder, Bob. Major Hazard (Asset Integrity) Key Performance Indicators in use in the UK Offshore Oil and Gas Industry. Paper at the CSB Indicators Public Hearing. July 24, 2012. 66

Chevron Richmond Refinery Regulatory Report October 2014

As of June 2012, the HSE employed roughly 3,300 staff, of which 1,381were front-line inspectors,363 whose responsibilities include conducting preventative inspections of roughly 950 COMAH facilities throughout the UK. The HSE employs roughly 105 inspectors to inspect approximately 300 offshore installations, in effect a one to three ratio. As such, the HSE, with a budget of roughly $472 million,364 has the authority to offer higher specialist salaries to attract and retain more experienced, competent personnel. According to information obtained from the HSE, in 2011 and 2012 their onshore specialist inspector pay ranged from $85,806 to $102,344, and their offshore inspector pay ranged from $134,387 to $148,423 at the highest grade and $116,288 to $131,499 at the next highest grade.365 A safety case regime requires regulators to conduct preventative facility inspections and audits against the safety case to ensure that specified controls are functioning as intended. Regulators must be capable of interacting as equals with company risk managers when conducting these inspections. Former HSE staff have communicated to the CSB that the HSE seeks new employees with good communication skills in addition to education and experience, as the job of a safety case regulator requires encouraging companies to aspire to make safety improvements that they may not want to make. One message that current and former HSE staff have repeated is that the industry believes having competent regulatory staff adds significant value to their business.366 In any country, competent offshore regulatory staff can persuade companies to manage risks in a rigorous manner, knowing that if not done properly, their risk management practices will be challenged.367 This competence is also essential for companies’ confidence in the accuracy of the regulatory staff’s advice, inspections, and citations. According to a literature review on the safety case in the UK, “[s]ome companies see as positive the requirement to have ‘someone external to the company keeping you on your toes by regularly asking if you have done all you can,’ and that it ‘forces you to convince yourself’ that you have covered all the risks.”368 362 In the UK, duty holders have a duty under the Offshore Installations (Safety Case) Regulations 2005 to “put in place and keep under continual review a verification scheme by means of which assurance is obtained from an independent competent person (ICP) that safety critical elements and PFEER [Offshore Installations ) Prevention of Fire and Explosion, and Emergency Response] specified plant are suitable and remain suitable for the lifetime of the installation.” See http://www.hse.gov.uk/offshore/verification.htm (accessed November 14, 2013). 363 HSE. The Health and Safety Executive Annual Report and Accounts 2011/12; July 2012; p 30. http://www.hse.gov.uk/aboutus/reports/1112/ar1112.pdf (accessed June 3, 2013). 364 For 2013/2014, HSE’s budget is listed as 308.1 £million. HSE recovers approximately 40 percent of its costs through income mainly in the nuclear, offshore, and chemical sectors, and the remainder is funded from Grant-in- Aid pursuant to the Health and Safety at Work etc. Act 1974, and fee for intervention (FFI).364 See HSE, “HSE Business Plan 2012-15,” July 2012; page 17. Available at http://www.hse.gov.uk/aboutus/strategiesandplans/businessplans/plan1215.pdf (accessed June 3, 2013). Conversion of UK Pounds to US Dollars is based on 1£ = 1.5313$. See http://wsj.com/mdc/public/page/2_3021-forex.html (accessed June 4, 2013). 365 Conversion of UK Pounds to US Dollars is based on 1£ = 1.5313$. See http://wsj.com/mdc/public/page/2_3021- forex.html (accessed June 4, 2013). 366 Based on conversations between the CSB staff and Magne Ognedal (Norway PSA), Ian Whewell (the UK HSE), Peter Wilkinson (Australia NOPSA [forerunner of NOPSEMA]), and John Clegg (inaugural CEO of NOPSA). 367 Peter Wilkinson, Manager Review Implementation Team, Offshore Safety Section, Australia Department of Industry, Tourism and Resources and “architect” of NOPSA. Presentation to the National Research Centre for Occupational Health and Safety, ANU (May 15, 2002). 368 Vectra Group Limited. Literature Review on the Perceived Benefits and Disadvantages of UK Safety Case Regimes; 2003; p 40. 67

Chevron Richmond Refinery Regulatory Report October 2014

In the US, the federal government has used extensive resources to retain the best available talent to focus on health and safety oversight of US commercial and defense nuclear facilities.369 For instance, many nonsupervisory technical staff at the US Nuclear Regulatory Commission370 (NRC) and the Defense Nuclear Facilities Safety Board are paid at the top of the General Schedule pay schedule.371 Virtually all technical staff at the Defense Nuclear Facilities Safety Board hold technical master’s degrees and approximately 25 percent hold doctoral degrees.372 The federal government has a unique category of non-executive positions that involve high-level research and development in the physical, biological, medical, or engineering sciences, or a closely-related field.373 These are known as “Scientific or Professional” positions, and they are classified above the highest general schedule pay level.374 These special salary authorizations contribute to the technical agencies’ ability to compete with private industry to recruit and retain highly competent staff. The NRC also has a type of funding mechanism that ensures that the agency’s budget adequately covers its regulator activities, as the NRC is required by law to recover at least 90 percent of its budget through licensing and inspection fees.375 Another method by which the NRC is able to attract and retain competent technical staff is its extensive training programs. For new inspection staff, the NRC requires a series of courses, assessments, and simulation, all of which takes approximately two years to complete.376 Inspectors must have a bachelor’s degree in engineering or a degree in a relevant scientific field and Professional Engineer certification.377 The agency operates a technical training center in Chattanooga, Tennessee, with various control room simulators that mirror licensees’ facilities. The NRC staff is expected to sufficiently understand this equipment so that they are able to conduct sufficient audits and investigations.378 Before he or she is fully qualified to conduct inspections, inspector candidates must be recommended by the NRC inspector qualification board and certified by the regional administrator or division director.379 As will be discussed in greater detail under Section 5.0, at the time of the Chevron incident, a majority of the regulators responsible for oversight of Chevron and other petroleum refineries in California did not have sufficient, sustainable funding or staffing to oversee major accident prevention activities. An effective safety case regulatory system would necessitate that the California industry regulator be well- 369 DNFSB FY2013 Budget Justification at p. 100 http://www.dnfsb.gov/sites/default/files/About/Budget%20Requests/2013/FY%202013_CONG%20BUDGET_FIN AL.PDF (accessed May 15, 2013). 370 Presentation by NRC Executive Director Bill Borchardt, January 2011. 371 $123,758 to $155,500 per year in 2012 in Washington, DC. See https://www.opm.gov/oca/12tables/html/dcb.asp (accessed May 15, 2013). 372 DNFSB FY2013 Budget Justification at p. 100 http://www.dnfsb.gov/sites/default/files/About/Budget%20Requests/2013/FY%202013_CONG%20BUDGET_FIN AL.PDF (accessed May 15, 2013). 373 http://www.opm.gov/ses/recruitment/stpositions.asp (accessed May 15, 2013). 374 http://www.opm.gov/ses/recruitment/stpositions.asp (accessed May 15, 2013). 375 Section 6101 “NRC User Fees and Annual Charges,” Omnibus Budget Reconciliation Act, Pub. L. 103-66. 107 Stat. 312 (Aug. 10, 1993). 376 NRC Inspection Manual, Qualification Program for Operating Reactor Programs (Ch. 1245) at 4, available at http://pbadupws.nrc.gov/docs/ML1110/ML11105A153.pdf (accessed May 28, 2013). 377 NRC Reactor Inspector Job Posting No. R-I/DRS-2013-0001 378 See, e.g., http://www.iaea.org/ns/tutorials/regcontrol/regbody/reg2124.htm (accessed May 28, 2013). 379 NRC Inspection Manual, Qualification Program for Operating Reactor Programs (Ch. 1245) available at http://pbadupws.nrc.gov/docs/ML1110/ML11105A153.pdf 68

Chevron Richmond Refinery Regulatory Report October 2014

resourced and retain a sufficient number of competent, well-trained and experienced staff to critically assess a company’s safety case. The overall knowledge and expertise of the regulator must at a minimum match that of industry in order for the regulator to successfully assess a company’s safety case with the ultimate goal of preventing major accidents.

69

Chevron Richmond Refinery Regulatory Report October 2014

  1. 0 Oversight of Petroleum Refineries in California

In California, there currently exists a patchwork of primarily activity-based federal, state, and local laws and regulations aimed at preventing harmful releases of hazardous materials at facilities such as petroleum refineries. This regulatory framework does not foster continuous improvement by driving companies to reduce risks of their hazardous activities to ALARP, nor does it have the requisite number of regulatory staff with the skills, knowledge, and experience to provide sufficient oversight. 5.1 Cal/OSHA 5.1.1 Background Information Section 18 of the OSHAct380 encourages states to develop and implement their own job safety and health programs. Twenty-five states (including California), Puerto Rico and the Virgin Islands currently implement OSHA-approved State Plans.381 States must set job safety and health standards that are “at least as effective as” comparable federal standards; most adopt standards that are identical to the federal standards.382 California was certified as an OSHA State Plan state on August 12, 1977.383 California’s Division of Occupational Safety and Health (Cal/OSHA) administers the California Occupational Safety and Health Program. A PSM District Office384 within Cal/OSHA enforces California’s PSM standard, which is established under Title 8, Section 5189 of the California Code of Regulations (CCR) and entitled Process Safety Management of Acutely Hazardous Materials.385,386 The PSM District Office is comprised of seven inspectors, known as Associate Safety Engineers, and one District Manager to regulate nearly 1,700 PSM-covered facilities in California, including 14 petroleum refineries. Only one of these individuals has a technical background, with a degree in Chemical Engineering. Appendix B of this report summarizes the key differences between the federal and California PSM standards and the safety case regulatory regime. A more detailed analysis of those differences will be provided in the remainder of Section 5.1.

The CSB in its Interim Report identified a number of weaknesses of Chevron’s process safety performance. In many of these causal issues, Chevron was not required to perform at a more effective level by the existing California PSM regulations. In Table 1 below, the CSB identifies the causal issues or findings, which highlight the gaps in the California and federal PSM regulations, and how each issue is more effectively managed in the safety case regulatory regime. In this section of the report, some of these examples will be examined in relation to key features of an effective regulatory approach such as the 380 29 U.S.C. §667 (2004). 381 These are referred to informally as OSHA State Plans. OSHA approves and monitors State plans and provides up to 50 percent of an approved plan's operating costs 382 29 U.S.C. §667 (c)(2) (2004). Also see http://www.osha.gov/dcsp/osp/faq.html (accessed May 13, 2013). 383 See http://www.osha.gov/dcsp/osp/stateprogs/california.html (accessed June 17, 2013). 384 The California PSM District Offices were established in 2001 after the February 1999 Tosco refinery incident in which four workers were fatally injured following the ignition of a highly flammable material during a turnaround operation. In January 2012 the two district offices were combined into one PSM District Office. 385 See http://www.osha.gov/dcsp/osp/stateprogs/california.html (accessed May 13, 2013). 386 8 CCR §5189 (2012). 70

Chevron Richmond Refinery Regulatory Report October 2014

safety case. More information on these causal findings can also be found in the CSB Chevron Interim Report.

Process Safety Element Causal Finding California PSM Regulation∗ The Safety Case Regulatory Regime** MOC Inspection recommendation to upgrade pipe to 9- Chrome not implemented. The MOC to implement the recommendation narrowed the scope allowing the 52- inch component that failed to remain in service. Implementation of 9- Chrome could have prevented the incident.387 MOC element requires implementation of written procedures to manage changes that shall address the impact of the change on health and safety; however the element is activity based and there is no requirement to implement effective recommendations or control hazards. There is no requirement in the MOC element to consider inherent safety. Cal/OSHA did not cite Chevron for this issue. Duty holder is required to drive risk to ALARP. Description of MOC procedures and demonstration of their effectiveness in managing major accident hazard risk are a key requirement of the safety case. Implementation of the concept of inherent safety is required.388 ∗ Unless otherwise noted, California and federal PSM requirements are nearly identical. ** Regulatory regimes such as offshore in Norway have many attributes of the safety case regulatory regime but are not called the safety case regulatory regime. 387 For more information, see CSB’s Chevron Richmond Refinery Interim Investigation Report. April 2013; p 41 and 42. http://www.csb.gov/assets/1/19/Chevron_Interim_Report_Final_2013-04-17.pdf (accessed October 30, 2013). 388 According to the HSE, essential considerations for determining whether a duty holder has reduced risks to ALARP include “the adoption of inherently safer designs…”. HSE. The Safety Report Assessment Manual, Sections 8 to 15. p 30. http://www.hse.gov.uk/comah/sram/s8-15.pdf (accessed October 30, 2013). The HSE also notes that the guidance to COMAH Regulation 4 (General Duty) “describes the application of all measures necessary to reduce risk of a major accident to ALARP based on a hierarchical approach (inherent safety, prevention, control, mitigation).” Ibid at 8. 71

Chevron Richmond Refinery Regulatory Report October 2014

Process Safety Element Causal Finding California PSM Regulation∗ The Safety Case Regulatory Regime** MOC Chevron conducted MOCs to evaluate proposed changes to crude feed that introduced higher sulfur concentration. However, Chevron failed to thoroughly evaluate the change of increasing sulfur weight percentage in crude oil feed and to assess how it might affect corrosion rates within the 4-sidecut piping circuit. Cal/OSHA did not issue any citations for failing to consider the impact of corrosion in the MOC process when sulfur composition in the crude oil feed was increased.389 MOC element is activity- based rather than performance based and requirements in RAGAGEP such as API 570390 do not apply to the MOC element of PSM. Cal/OSHA did not cite Chevron for this issue. Duty holder is required to drive risk to ALARP. Duty holder must identify in the safety case report the standards that they are using to reduce risk such as API 570. The implementation of those standards can be enforced by the regulator to achieve ALARP. PHA In its 2009 crude unit PHA, Chevron simply cited non- specific, judgment-based qualitative safeguards such as: utilizing metallurgy to minimize corrosion, having effective maintenance and inspection programs, and providing pipe wall corrosion allowances. The effectiveness of these safeguards was neither evaluated nor documented; instead the safeguards were merely listed in the PHA. While the PHA element requires addressing the control of hazards, it does not require addressing the effectiveness of the controls or using the hierarchy of controls. For example, the standard would not require the use of improved metallurgy or inherent safety to mitigate corrosion hazards. Cal/OSHA did not cite Chevron for this issue. Requires the use of the most effective practical safeguards to achieve ALARP. The safety case requires the use of inherently safer design and the hierarchy of controls.391 389 For more information, see CSB’s Chevron Richmond Refinery Interim Investigation Report. April 2013; p 34, 35 and 36. http://www.csb.gov/assets/1/19/Chevron_Interim_Report_Final_2013-04-17.pdf (accessed October 30, 2013). 390 API 570. Piping Inspection Code: In-service Inspection, Rating, Repair, and Alteration of Piping Systems. November 2009. 391 According to the HSE, essential considerations for determining whether a duty holder has reduced risks to ALARP include “the adoption of inherently safer designs…”. HSE. The Safety Report Assessment Manual, Sections 8 to 15. p 30. http://www.hse.gov.uk/comah/sram/s8-15.pdf (accessed October 30, 2013). The HSE also notes that the guidance to COMAH Regulation 4 (General Duty) “describes the application of all measures necessary to reduce risk of a major accident to ALARP based on a hierarchical approach (inherent safety, prevention, control, mitigation).” Ibid at 8. 72

Chevron Richmond Refinery Regulatory Report October 2014

Process Safety Element Causal Finding California PSM Regulation∗ The Safety Case Regulatory Regime** PHA The 4-sidecut line was analyzed in the most recent crude unit PHA. Corrosion was not identified as a potential cause of a leak/rupture in the piping. Damage mechanism hazard reviews are not required by the PSM regulation. The process hazard analysis element does not require consideration of RAGAGEP such as API RP 571, Damage Mechanisms Affecting Fixed Equipment in the Refining Industry. Cal/OSHA did not cite Chevron for this issue. For example in the UK the HSE has worked with the industry to develop guidance on damage mechanism hazard reviews in the UK's offshore petrochemical industry. The implementation of best practice standards referenced by a duty holder’s safety case report may be enforced by the regulator to achieve ALARP. Incident Investigations Chevron made recommendations following its investigation of sulfidation incidents at Richmond, Salt Lake City and Pascagoula refineries requiring 100 percent component inspection in high risk piping systems. These recommendations were not implemented in the Richmond refinery crude unit prior to the incident. In 2007 Chevron identified the inherently safer solution of improved metallurgy to prevent sulfidation corrosion but only applied it to the crude unit small spool piece that failed. Neither California nor federal PSM regulations require root cause investigations or recommendations to be developed as the result of incident investigations. While California does require taking action to prevent reoccurrence, (goes beyond federal OSHA) it does not drive risk to ALARP. Cal/OSHA did not cite Chevron for this issue. Federal PSM does not require the development of recommendations or the prevention of future incidents. Investigation of incidents is required to demonstrate legal compliance with framework legislation. ALARP requirement would require remedial action including cross- company learning from incident investigations. HSE can require safety case duty holder compliance with investigation report recommendations (e.g. Buncefield Report- “determine SIL level requirements for overfill protection”). 73

Chevron Richmond Refinery Regulatory Report October 2014

Process Safety Element Causal Finding California PSM Regulation∗ The Safety Case Regulatory Regime** Mechanical Integrity Chevron was instrumental in the development of API RP 939-C, which suggests ("should") but does not require ("shall") that 100 percent component inspection be performed. API states that the use of "shall" denotes minimum requirements in the use of the standard - API RP 939- C has no minimum requirements (no substantive "shalls" are used in the recommended practice). The mechanical integrity element of PSM requires that for inspection and testing procedures, employers follow RAGAGEP. However, API RP 939-C has no minimum requirements. Nonetheless, Cal/OSHA cited Chevron for failure to follow API RP 939-C under this mechanical integrity provision. In the federal regulatory context, this approach has been called into question by the recent administrative law judge decision in BP Products. This case is scheduled for review by the full commission. In a safety case regime, the regulator can reject the use of weak and inadequate standards referenced in a safety case report (by rejecting the report) and can require more rigorous performance to achieve ALARP. 74

Chevron Richmond Refinery Regulatory Report October 2014

Process Safety Element Causal Finding California PSM Regulation∗ The Safety Case Regulatory Regime** Inherent Safety Chevron employees have recommended implementing inherently safer designs through the MOC process, incident investigations, technical reports, and past employee recommendations. However, the CSB has not identified any documented, thorough analysis of the proposed inherently safer solutions. In addition, Chevron has repeatedly failed to implement proposed inherently safer recommendations. Had Chevron implemented these recommendations, the incident could have been prevented. Neither California nor federal PSM regulations require the use or implementation of inherent safety. Cal/OSHA did not cite Chevron for this issue. In its Interim Report, the CSB made a recommendation to the California legislature and the Governor of California to use inherently safer systems analysis and the hierarchy of controls to the greatest extent feasible in establishing safeguards for identified process hazards. Safety case requires the implementation of inherently safer systems analysis.392 Regulator Enforcement Despite numerous safety system deficiencies the Cal/OSHA regulator failed to identify these issues prior to the incident. Cal/OSHA conducted three planned inspections prior to the incident that resulted in no citations or fines. The CSB determined Cal/OSHA lacked sufficient resources and numbers of highly qualified inspectors. California is adding 15 additional inspectors to its PSM unit. The Governor's Interagency Task Force on Refinery Safety will be proposing to implement additional recommendations from their draft report. A key feature of the safety case is a rigorous review of the safety case report that may be accepted or rejected by the regulator. Preventative audits of covered facilities are regularly performed by technically competent, well resourced regulators. 392 According to the HSE, essential considerations for determining whether a duty holder has reduced risks to ALARP include “the adoption of inherently safer designs…”. HSE. The Safety Report Assessment Manual, Sections 8 to 15. p 30. http://www.hse.gov.uk/comah/sram/s8-15.pdf (accessed October 30, 2013). The HSE also notes that the guidance to COMAH Regulation 4 (General Duty) “describes the application of all measures necessary to reduce risk of a major accident to ALARP based on a hierarchical approach (inherent safety, prevention, control, mitigation).” Ibid at 8. 75

Chevron Richmond Refinery Regulatory Report October 2014

Process Safety Element Causal Finding California PSM Regulation∗ The Safety Case Regulatory Regime** Workforce Involvement The workers in previous loss of containment incidents raised concerns about the level of corrosion in the Crude and RLOP incidents, but their concerns were not effectively addressed prior to the August 6, 2012, incident. The workforce participation element requires an employer to develop a written plan to "ensure employee participation in process safety management…” including "consultation with employees and their representatives on the conduct and development of the elements of process safety management...” However, development of a written plan to satisfy the regulatory requirements does not ensure that workers and their representatives in practice are able to effectively participate in a company's safety management system such as PHAs, MOCs, and investigation activities. Safety case sets out a legal framework for the participation of employees on health and safety-related matters, the election of safety representatives, and the establishment of safety committees to serve health and safety related functions. Workforce participation practices are documented by the duty holder and submitted to the regulator.

Table 1. CSB Causal Findings.

  1. 1.2

Analysis 5.1.2.1 ALARP Unlike the OSHAct, the California Occupational Safety and Health Act does not have a General Duty Clause. Rather, Section 5189 was established to “eliminate to a substantial degree, the risks to which employees are exposed in petroleum refineries, chemical plants and other facilities.”393 By focusing on the significant reduction of risk, this language supports the principle of ALARP, which requires a showing by the company that “there are no other practical measures that could reasonably be taken to reduce risks further.”394 However, this section, which lays out the “scope and purpose” of the regulation, is not an enforceable element of the regulation that is subject to citations, and the remaining PSM regulation elements do not lead in practice to that result. Rather, California’s PSM standard has remained activity-based, with many activity-based elements almost identical to the federal PSM standard. For example, an employer must “perform a hazard analysis [PHA] appropriate to the complexity of the 393 8 CCR §5189 (a) (2012). 394 ALARP Guidance Note N-04-300-GN0166, Rev. 3 (Dec. 2011) available at http://www.nopsema.gov.au/assets/document/N-04300-GN0166-ALARP.pdf (accessed May 15, 2013). 76

Chevron Richmond Refinery Regulatory Report October 2014

process for identifying, evaluating, and controlling hazards involved in the process....”395 The PHA must address hazards of the process; engineering and administrative controls applicable to the hazards and their relationships; consequences of failure of these controls; facility siting; human factors; a qualitative evaluation of a range of the possible safety and health effects of the failure of controls on facility employees; and the identification of any previous incident which had a likely potential for catastrophic consequences in the workplace.”396 This language does not support the principle of ALARP, and makes no mention of risk or continuous improvement in any way. As a result, PHAs satisfy the California PSM regulatory requirement by merely listing safeguards; there is no requirement to evaluate or document the effectiveness of these safeguards, or to show that the safeguards in place are effectively reducing risks. As discussed in the CSB’s Interim Report on the Chevron incident, Chevron cited in its 2009 crude unit PHA non-specific, judgment-based qualitative safeguards such as: utilizing metallurgy to minimize corrosion, having effective maintenance and inspection programs, and providing pipe wall corrosion allowances.397 The effectiveness of these safeguards was neither evaluated nor documented. Had the adequacy of these safeguards been verified, improved safeguards intended to protect against sulfidation- induced failure of carbon steel piping could have been recommended. In addition, while the 4-sidecut line was analyzed in this PHA, corrosion was not identified as a potential cause of a leak/rupture in the piping (emphasis added). A corrosion review, also referred to as a damage mechanism hazard review, analyzes hazards presented by all process failure mechanisms such as corrosion and cracking. This type of review, while considered to be good practice,398 is not required by the PSM regulations either federally or in California, and as such the CSB made a recommendation in its Interim Report to require these in future California PHAs. Under a safety case regulatory regime, the regulator has the ability to drive industry to adapt new technologies and safer practices as soon as they are developed; new rulemaking is not required for immediate improvements, because companies are obligated to continually work toward specified performance goals such as reducing risks to ALARP. Therefore, under a safety case regulatory regime the regulator could require these types of reviews to be conducted to reduce risk without requiring additional legislation. Cal/OSHA does not typically review a company’s PHA as part of its routine oversight of process safety management unless there is a specific complaint, accident, or targeted inspection. Nor does it “accept” a company’s PHA and proposed hazard mitigations. Therefore, prior to the August 2012 incident, Cal/OSHA inspectors did not require any additional information or analysis to be provided in the Chevron crude unit PHA. Highlighting the reactive nature of the PSM standard, Cal/OSHA inspected the Chevron facility post-incident and issued 17 citations related to the incident and eight additional citations, with a total proposed fine of nearly $1 million. Only one citation related to PHAs, and it was not associated with evaluating the effectiveness of safeguards or failure to control the 4-sidecut corrosion hazard. Rather, the emphasis was that Chevron’s PHA did not adequately account for hazards caused by other units 395 8 CCR §5189 (e)(1) (2012). 396 8 CCR §5189 (e)(2) (A) through (G) (2012). 397 Corrosion allowance refers to extra wall thickness added as a safety factor to the design of a piece of equipment beyond that needed solely for mechanical considerations such as design temperature and pressure. This extra thickness is provided to accommodate for expected loss of wall thickness due to corrosion over the life of the equipment. 398 API RP 571, Damage Mechanisms Affecting Fixed Equipment in the Refining Industry, describes common process failure mechanism and is considered to be good practice for analyzing risks presented by process failure mechanisms such as corrosion and cracking. 77

Chevron Richmond Refinery Regulatory Report October 2014

associated with the crude unit. This again highlights the lack of a requirement for Chevron to demonstrate that risks have been reduced to ALARP, or for Chevron to provide this type of analysis to Cal/OSHA to review.

  1. 1.2.2

Adaptability and Continuous Improvement

Of the 25 Cal/OSHA citations mentioned above, two were issued to Chevron for its failure to follow API RP 939-C, Guidelines for Avoiding Sulfidation (Sulfidic) Corrosion Failures in Oil Refineries as RAGAGEP. This voluntary API standard will be discussed in greater detail in the CSB’s Final Investigation Report on the Chevron incident. However, it is important to note for purposes of this report that API RP 939-C is a permissive and voluntary standard merely intended to provide guidance to industry personnel on how to address sulfidation corrosion in petroleum refining operations. Existing safety guidelines use words “shall” and “should” to denote either requirements or recommendations. API RP 939-C does not use the word “shall”; as such, it contains no requirements for industry. While the regulator in a safety case regulatory regime has the authority to analyze and challenge the requirements of API RP 939-C with the goal of driving continuous improvement and risk reduction (note the Buncefield examples discussed in Section 4.3), in the present case Cal/OSHA utilized the voluntary practice as an opportunity to issue a citation to Chevron post-incident. Cal/OSHA did not analyze API RP 939-C to determine whether its provisions are sufficient to reduce risks and manage hazards. It also remains to be seen whether this citation will be upheld considering the permissive language contained within the standard. Chevron has investigated a number of sulfidation incidents at its refineries over the years, including Richmond, Salt Lake City, and Pascagoula. Figure 2 shows a timeline of Chevron’s key sulfidation events. In January 2007, a failure due to sulfidation corrosion caused a serious fire in the Chevron Richmond Refinery crude unit resulting in a CWS Level 3 alert, injuring one worker and initiating a shelter-in-place for the surrounding community. As a result of these investigations, Chevron made internal recommendations to require 100 percent component inspections in high-risk piping systems. However, these recommendations were not implemented in the Richmond Refinery crude unit prior to the incident, highlighting a lack of learning from previous incidents by Chevron. 78

Chevron Richmond Refinery Regulatory Report October 2014

Figure 2. Chevron's key sulfidation events between 1974 and 2013.

In addition, as a result of the January 2007 incident, Chevron informed Contra Costa Health Services’ Hazardous Materials Program399 (CCHMP) in a letter that the crude unit piping metallurgy had been upgraded following this incident as an inherently safer solution. However, the CSB learned that this upgrade was limited to only the immediate piping spool400 that failed. Cal/OSHA also did not require Chevron to update the crude unit PHA to address the findings from this incident. Under a safety case regulatory regime, the regulator would work with the company to improve its practices following such an incident. The company would also be required to update its safety case report to address these corrosion hazards and demonstrate how the company has reduced risks to ALARP.

The CSB also noted in its Chevron Interim Report that despite internal recommendations to replace the entire #4 sidecut piping with an inherently safer, more corrosion-resistant material of construction, Chevron’s 2006 Management of Change (MOC) analysis limited the application of those recommendations. Instead of replacing the entire piping segment identified by the original recommendation, the 2006 MOC considered only the replacement of a small section. Although the recommendation was intended to more broadly apply inherently safer materials of construction, the final implementation under the 2006 MOC limited the application of this more corrosion resistant 399 Contra Costa Health Services’ Hazardous Materials program is designed to respond to emergencies and monitor hazardous materials within Contra Costa County. See http://cchealth.org/hazmat/ (accessed April 17, 2013). CCHSHMP also implements the CalARP and ISO programs, which will be discussed in greater detail later on. 400 A piping spool is a small, removable section of piping. In some cases, a piping spool is installed or removed in order to provide a temporary connection or complete disconnection between two piping circuits. 79

Chevron Richmond Refinery Regulatory Report October 2014

metallurgy.401 As the mere completion of an MOC and the implementation of any action item satisfy the California PSM standard requirements, regardless of its adequacy or effectiveness, Cal/OSHA did not evaluate the MOC or cite Chevron for narrowing the scope of the MOC, despite its disregard of internal recommendations. Neither the California nor the federal PSM standards allow citations for inadequate MOCs. In addition, RAGAGEP does not apply to the MOC PSM element.

This can be contrasted with the safety case regulatory regime in the UK, where the HSE includes the adoption of inherently safer designs as an essential consideration for determining whether a duty holder has reduced risks to ALARP.402 The HSE also notes that the guidance to COMAH Regulation 4, (the COMAH General Duty provision) “describes the application of all measures necessary to reduce risk of a major accident to ALARP based on a hierarchical approach (inherent safety, prevention, control, mitigation).”403 5.1.2.3 Process Safety Indicators As the CSB has noted in its BP Texas City Investigation Report, Chevron Interim Report, and Section 4.5 of this report, process safety indicators are a significant element of process safety management systems and are critical for reducing process safety incidents. A major goal of process safety indicators is to drive continuous process safety improvement. Regulators can utilize these indicators to focus inspections, audits, and investigations.

Federally and in the state of California, neither the PSM standard nor the RMP rule require companies to utilize or report process safety indicators. Chevron voluntarily utilizes both leading and lagging indicators internally in its US petroleum refineries, in a system called Operational Excellence and Reliability Intelligence (OERI), which tracks 26 different process safety indicators. OERI was implemented in May 2009. However, Chevron is not required to report the status of its indicators to California regulators. Nor is Chevron held accountable to use the indicators to drive performance or continuous improvement. As a result, the CSB made a recommendation in its Chevron Interim Report to the California State Legislature to identify and require the reporting of leading and lagging process safety indicators to state and local regulatory agencies, with the goal of improving mechanical integrity and process hazard analysis performance at all California petroleum refineries, and preventing major chemical incidents. 5.1.2.4 Inspections As noted in Section 4.6, safety case regulators utilize preventative inspections and audits to monitor compliance with legislation and to ensure that the facility and its operations are consistent with information provided in the safety case. However, like federal OSHA, California regulations require Cal/OSHA to prioritize accident, complaint, and referral-based inspections over planned inspections. As such, Cal/OSHA’s inspection program of the nearly 1,700 PSM-regulated facilities in California, 401 As discussed in the Interim Report, only the section of piping downstream of the pumps was replaced with 9- Chrome. 402 HSE. The Safety Report Assessment Manual, Sections 8 to 15. p 30. http://www.hse.gov.uk/comah/sram/s8- 15.pdf (accessed October 30, 2013). 403 Ibid at 8. 80

Chevron Richmond Refinery Regulatory Report October 2014

including 14 petroleum refineries, 404 has been reactive in nature rather than proactive to maximize prevention. OSHA State Plan states405 were strongly encouraged but not required to implement the federal Petroleum Refinery NEP. Cal/OSHA did not adopt the NEP “because of its dedicated PSM Unit.”406 Between 2006 and August 6, 2012, the Cal/OSHA PSM District Office conducted only three planned inspections of the Chevron Richmond facility, totaling only 150 inspector hours of effort. Cal/OSHA has acknowledged that these were not PQV inspections, as envisioned in its mission statement and in the federal PSM compliance directive. None of these inspections resulted in citations or fines. According to statistics provided by OSHA, federal NEP refinery inspections conducted between 2007 and the end of 2011 required roughly 1,000 inspector hours each and resulted in an average of 11.2 violations and $76,821 in penalties per inspection. OSHA noted that hours spent on a typical federal refinery NEP inspection were 40 times greater than the average OSHA inspection. These numbers indicate a major disparity in thoroughness and comprehensiveness between the planned inspections conducted by Cal/OSHA and the NEP inspections conducted by OSHA and other OSHA State Plan States. The federal NEP, which represented a more robust and intensive inspection program, ended in 2011 due to the stated great demand on OSHA resources. 5.1.2.5 Workforce Participation Like the federal PSM standard, California’s PSM standard provides for workforce participation in a company’s process safety management program. 8 CCR §5189 (p) requires an employer to develop a written plan to “ensure employee participation in process safety management” including “consultation with employees and their representatives on the conduct and development of the elements of process safety management…”407 However, developing a written plan to satisfy the regulatory requirements does not ensure that workers and their representatives in practice are able to effectively participate in a company’s process safety management systems. In its investigation of the Chevron incident, the CSB noted that the Chevron Richmond Refinery workforce and its representatives, the United Steelworkers (USW), had expressed concerns regarding sulfidation corrosion and broader workplace safety issues, but were not consistently listened to by Chevron managers, and their concerns regarding corrosion were not adequately acted upon. In November 2011, Cal/OSHA investigated a complaint of unsafe working conditions during the fourth quarter Richmond Lube Oil Plant (RLOP) turnaround at the Richmond Refinery. The RLOP receives feedstock from the crude unit where the August 6th incident occurred and has similar sulfidation corrosion concerns. During the shutdown of the RLOP, a fire occurred at one of the RLOP furnaces. According to Cal/OSHA’s inspection report, Chevron employees told Cal/OSHA that “OPERATORS GET IGNORED.” Many of the employees were concerned about increased corrosion they were finding during the turnaround, and believed that increased temperatures and throughput rates had an adverse effect on 404 Also see the California Labor Code Sections 6309 to 6315 (The California Occupational Safety and Health Act of 1973). 405 Section 18 of the Occupational Safety and Health Act of 1970 encourages States to develop and operate their own job safety and health programs, referred to informally as an OSHA State Plan. OSHA approves and monitors State plans and provides up to 50 percent of an approved plan's operating costs. 406 Department of Industrial Relations, Division of Occupational Safety and Health, California, Process Safety Management District Office. Mission Statement: Goals Reached in 2011 & Strategic Plan for 2012. 407 8 CCR §5189(p)(1) (2012). 81

Chevron Richmond Refinery Regulatory Report October 2014

equipment integrity. According to the interview notes, many operators had raised issues of corrosion in the RLOP to higher level supervisors to no avail; according to one, if you raise an issue a couple of times, “you get labeled a ‘pest.’” The CSB has not identified evidence indicating that Cal/OSHA took further action to respond to these concerns, and Cal/OSHA did not issue any citations as a result of its investigation.408 Post-incident, significant sulfidation corrosion was found in the RLOP and piping and equipment were replaced. The CSB found other significant evidence that increased workforce participation could have reduced the likelihood that unchecked corrosion would lead to the August 2012 incident. As discussed in the CSB’s Interim Report on the Chevron incident, Chevron technical staff has considerable knowledge and expertise regarding sulfidation corrosion, specifically with respect to corrosion rate variations caused by differing silicon concentration in carbon steel piping. Chevron employees have authored industry papers on sulfidation corrosion and had significant influence in the development of the industry sulfidation corrosion recommended practice, API RP 939-C. In 2009, Chevron Energy Technology Company (Chevron ETC)409 created an internal document on the subject of sulfidation corrosion. Chevron ETC metallurgists released a formal report dated September 30, 2009 (nearly 3 years prior to the incident) to Chevron refinery-based reliability managers and chief inspectors entitled Updated Inspection Strategies for Preventing Sulfidation Corrosion Failures in Chevron Refineries. Sulfidation experts explained in the Chevron ETC report that, “[u]ntil now, Chevron has not directly addressed the risk of low Si[licon] carbon steel…”410 and that the report introduced a program that “seeks to close these gaps, and to maximize the effectiveness of our inspection.” The report clearly indicates that Chevron understood both the potential consequence and the high likelihood of a rupture or catastrophic failure from sulfidation corrosion and calls out Chevron’s need for action. The Chevron ETC report specifically recommended that inspectors perform 100 percent component inspection on high temperature carbon steel piping susceptible to sulfidation corrosion. However, this 100 percent component inspection program was not implemented at the Richmond refinery prior to the August 6, 2012, incident. The Chevron ETC report defined a priority ranking system to help focus the inspection implementation efforts. The process conditions of the 4-sidecut pipe placed it in the highest priority for inspection. Chevron ETC technical experts issued a corporate newsletter in 2010 that again warned of the potential consequence of sulfidation failures. In this newsletter, the 100 percent component inspection recommendation from the 2009 report was reiterated for piping systems such as the crude unit 4-sidecut piping. The newsletter stated: Sulfidation corrosion failures … are of great concern because of the comparatively high likelihood of ‘blowout’ or catastrophic failure. This typically happens because corrosion occurs at a relatively uniform rate over a broad area, so a pipe can get progressively thinner until it actually bursts rather than leaking at a pit or local thin area. In addition, the 408 Post-incident, there were significant mechanical integrity improvements and piping replaced in the RLOP unit. 409 The Chevron Energy Technology Company is a separate business unit within the Chevron Corporation that provides technology solutions and technical expertise for Chevron operations worldwide. See http://richmond.chevron.com/home/aboutchevronrichmond.aspx (accessed April 4, 2013). 410 A 2003 corporate technical newsletter recommended 100 percent component inspection of carbon steel piping susceptible to sulfidation corrosion following a 2002 Chevron Salt Lake City sulfidation corrosion incident. 82

Chevron Richmond Refinery Regulatory Report October 2014

process fluid is often above its auto ignition temperature. The combination of these factors means that sulfidation corrosion failures frequently result in large fires. Chevron and the industry have experienced numerous failures from this mechanism and recent incidents have reinforced the need for revised inspection strategies and a robust PMI (Positive Materials Identification) program. The Chevron ETC 100 percent component inspection recommendation for high risk piping systems, established in 2009, was not implemented at Richmond, and the thin-walled low silicon 4-sidecut piping component remained in service until it catastrophically failed on August 6, 2012. Chevron and Chevron ETC metallurgists, materials engineers, and piping inspectors had expertise regarding sulfidation corrosion. They educated personnel and advocated for identification and control of damage mechanisms, including sulfidation corrosion. However, they had limited practical influence to implement their recommendations. These individuals did not participate in the crude unit PHA and did not affect decisions concerning control of sulfidation corrosion during the crude unit turnaround process.411 Despite the history of sulfidation corrosion incidents and the recommendations by Chevron’s workforce to implement better inspection methodologies, Cal/OSHA did not evaluate these recommendations or determine whether Chevron management ensured that the hazards of this damage mechanism were addressed and mitigated in Chevron’s PHAs. In addition, Cal/OSHA issued no citations to Chevron post- incident regarding the failure to address sulfidation corrosion in its crude unit PHA. Finally, when Chevron employees raised concerns, Cal/OSHA did not effectively address them. The examples highlighted in this section speak to the need for California to develop more effective regulation similar to the UK legislation discussed in Section 4.4, to ensure strong workforce involvement in health and safety matters at petroleum refineries. This will not only help prevent incidents such as the one that occurred at Chevron, but it will also help improve communication and ensure that workers are represented in the decisions that affect them. 5.1.2.6 Funding and Regulator Competency Cal/OSHA has not received sufficient funding to employ a well-staffed, multi-disciplinary team capable of conducting thorough inspections of PSM-covered facilities in California. This is apparent when examining the lack of preventative, planned inspections of petroleum refineries being conducted by the PSM team in the state. In order for a safety regulatory regime to successfully regulate with the goal of major accident prevention, there must be a technically competent, well-resourced regulator in place to sufficiently review, scrutinize, and challenge the hazard identification and evaluation that has been conducted and controls that have been put in place to reduce risk, to help drive continuous improvement and ensure that risks are being controlled. It is not an acceptable outcome for society that petroleum refineries with the potential for catastrophic accidents be inspected only after an accident occurs or a complaint is filed.

411 The turnaround process includes both the planning stage prior to the shutdown and the activities staged during the shutdown. 83

Chevron Richmond Refinery Regulatory Report October 2014

Compensation is one important factor for recruiting and retaining technically competent personnel. The CSB found that California regulators are significantly less compensated when compared to their industry counterparts. Based on information Chevron provided to the CSB, the average annual salary of refinery personnel who would interact with a California regulator performing an audit or safety inspection is $187,630. Table 2 below provides the 2012 salaries of California regulatory personnel that the CSB determined would likely perform a safety inspection or a hypothetical safety case assessment. These figures indicate a substantial compensation gap between the regulator and the regulated. A Cal/OSHA PSM team of associate safety engineers receive an average annual salary that is 46 percent lower than the refinery employees they would likely interface with during an inspection. EPA RMP inspectors receive an annual salary that is 33 percent lower than their facility counterparts and Contra Costa County accidental release prevention engineers and their supervisor are paid 48 percent less than these industry personnel.412

Entity Average Annual Salary Refinery Personnel $187,630 Cal/OSHA $100,536 Contra Costa County $96,875 EPA $125,000 Table 2. Average 2012 salary for individuals selected by the CSB as representative of the professional staff within each California regulator and of the refinery professional staff who interface with the regulators regarding audits or safety inspections at the Chevron Richmond Refinery. As noted in the introduction of this report, the California State Legislature approved a 2013-2014 state budget bill (AP 110) that allows the California Department of Industrial Relations to charge state petroleum refineries a fee by March 31, 2014, to support an increase in funding and to pay for at least 15 new positions in Cal/OSHA’s PSM Unit.413 The CSB considers this to be a positive step towards improving process safety management in the state of California, as it will provide the team the opportunity to conduct more thorough inspections. However, it is imperative that these additional inspectors have the skills, knowledge, and experience to provide sufficient direct oversight over PSM- covered facilities. Despite the additional funding, there remains a longstanding salary cap on associate safety engineers within Cal/OSHA. This will continue to make it difficult for Cal/OSHA to consistently attract or retain the necessary talent and expertise to effectively oversee these facilities. 412 Compensation information is based on salary only. It does not take into account non-salary information such as bonuses, retirement programs, or benefit programs. 413 See http://www.caltax.org/homepage/062113_Legislature_Approves.html (accessed July 9, 2013). 84

Chevron Richmond Refinery Regulatory Report October 2014

  1. 2

U.S. Environmental Protection Agency According to the EPA OIG, as of May 2012, only eight states and five local agencies had accepted full or partial RMP program delegation from EPA.414 As such, EPA regions directly implement the RMP program in most states. As no state agency has requested or received delegation to implement the RMP program within EPA Region 9, the federal EPA regional office is responsible for RMP program implementation for California as well as Arizona, Nevada, Hawaii, the Pacific Islands, and 148 Tribal Nations. 5.2.1 Risk Management Plan (RMP) Program As of March 2013, there were 1,137 RMP-covered facilities in Region 9: 957 in California; 118 in Arizona; 42 in Nevada; 16 in Hawaii; and four in Guam.415 The Chevron Richmond Refinery has many processes covered by the RMP rule, including Program 3 processes, 416 such as the crude unit. As such, Chevron is required to submit an RMP every five years to EPA Region 9, and EPA is expected to audit the facility against this RMP to ensure compliance. According to Chevron’s most recent RMP submitted to EPA Region 9 in October 2011, its crude unit contained 400,000 pounds of a flammable mixture of propane, pentane, butane, ethane, and methane, well above the 10,000-pound threshold quantity for flammables.417 EPA Region 9 employs four full-time and two part-time RMP inspectors to implement the RMP program for the roughly 1,100 RMP-covered facilities in the entire region. Region 9 staff informed the EPA OIG that to most effectively utilize their resources, they “place an additional focus on facilities in States, such as Arizona, that do not have their own risk management or accident prevention programs.418 The EPA’s mandates to conduct a certain number of inspections at high-risk facilities plus a lack of resources and staffing prevent the inspectors from fully auditing many of the petroleum refineries in each state; thus, the inspectors aim to visit each refinery every three years, where they pick one process to evaluate for two to three days. These inspectors target their inspections towards a specific industry issue during these visits. For example, when they last inspected Chevron in 2010, the inspectors focused on the issue of high temperature hydrogen attack (HTHA) due to the Tesoro incident that occurred in April 2010.419 414 EPA OIG. Improvements Needed in EPA Training and Oversight for Risk Management Program Inspections; March 21, 2013; p 2. 415 US EPA Region 9 Emergency Prevention and Preparedness Program; Stanislaus County Powerpoint; March

  1. See http://www.condorearth.com/files/08-Enforcement_Priorities-Mary_Wesling.pdf (accessed May 14,

2013). 416 Processes not eligible for Program 1 and either subject to OSHA’s PSM standard or classified in one of ten specified North American Industrial Classification System (NAICS) codes are placed in Program 3, which imposes OSHA’s PSM standard as the prevention program as well as additional hazard assessment, management, and emergency response requirements. 417 EPA List of Regulated Chemicals and Threshold Quantities for RMP program available at http://www.epa.gov/R5Super/cepps/pdfs/rmp-listed-chemicals-200708.pdf (accessed May 17, 2013). 418 California has its own RMP program, called CalARP. See EPA OIG. Evaluation Report: EPA Can Improve Implementation of the Risk Management Program for Airborne Chemical Releases; February 10, 2009; p 23. 419 On April 2, 2010, a heat exchanger ruptured due to high temperature hydrogen attack, resulting in seven worker fatalities at the Tesoro Anacortes Refinery in Anacortes, Washington. The CSB is set to release its investigation report on this incident near the end of January 2014. 85

Chevron Richmond Refinery Regulatory Report October 2014

  1. 2.2

Implementation of the RMP Program In order for a safety regime to function well, there must be a competent, well-resourced regulator in place to implement the regime. However, the EPA Region 9 RMP group is extremely understaffed and under- resourced, as there are only six full-time inspectors to cover over 1,100 facilities across many states. Instead of fully inspecting or auditing petroleum refineries, the group is able to inspect one process at each refinery for two to three days every three years, which makes fully inspecting these facilities or auditing against the RMPs submitted by these facilities impossible. In addition, this group has other responsibilities beyond the RMP program, including the management of contracts, emergency prevention and preparedness training and outreach, and reporting violations under the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA). The CSB has learned that because this group has such limited resources, it hopes to delegate RMP inspection authority to other agencies throughout the region, as long as it maintains power to enforce violations. Like the federal and California PSM standards, the RMP regulations provide for workforce participation420 and require facilities to prepare a written plan of action regarding employee participation. It is the RMP program’s policy to invite employee representatives to participate in all parts of onsite inspections. EPA Region 9 RMP staff told the CSB, however, that the limited amount of time they were able to spend onsite at refineries made speaking with facility inspectors and operators a difficult task. They expressed that a lesson learned from the Chevron incident was that EPA RMP inspectors should commit more time onsite during facility inspections and audits, which will allow them more time to speak with workers to gain a better insight into how any issues within the facility are being addressed and resolved.421 As mentioned above, EPA guidance on the RMP program states that the owner or operator’s duty to “prevent accidents and ensure safety at [their] source…” may require steps to be taken “beyond those specified in the risk management program rule.”422 While this principle appears to be similar to ALARP requirements of the safety case, in practice this is not required, and whether this is done is not subject to regulation or review. Similar to the PSM standard, RMP regulations require each facility with Program 3 processes to conduct a PHA as part of its prevention program that is “appropriate to the complexity of the process…and[] identify, evaluate, and control the hazards involved in the process.”423 However, these regulations do not require facilities to include these analyses in the RMPs they submit to EPA. Rather, facilities with Program 2 or 3 processes are only required to include in the RMP very high-level, simplified information on their prevention programs and their PHAs. The Chevron Richmond Refinery’s most recent RMP submission from October 2011 included the following information on the PHAs for each relevant process: the date of the last PHA for that process; what technique was used; what major hazards were identified; what process controls were in use (i.e. automatic shutoffs, interlocks, alarms, emergency power); what mitigation systems were in use (i.e. dikes, fire walls, water curtain); what monitoring/detection systems were in use (i.e. process area detectors); date of the most recent review or 420 See 40 CFR §68.83 (2000). 421 This need for greater interface with worker is a professional opinion by EPA staff, but has not resulted in EPA policy modifications to ensure effective worker input in future inspections. 422 EPA Office of Solid Waste and Emergency Response. General Guidance on Risk Management Programs for Chemical Accident Prevention (40 CFR Part 68); March 2009; p 7-7. See http://www.epa.gov/osweroe1/docs/chem/Toc_final.pdf (accessed May 14, 2013). 423 40 CFR §68.67(a) (1998). 86

Chevron Richmond Refinery Regulatory Report October 2014

revision of training programs; and maintenance. Chevron included one paragraph entitled “E.5. General Accidental Release Prevention Program,” which stated that PSM is applied to the entire refinery, and the PSM program is documented in Refinery Instruction (RI)-360, “Richmond Refinery PSM Policy.” No additional information or analysis could be located concerning the identification or control of hazards, or risk reduction, as, unlike the safety case model, there is no requirement for the company to demonstrate to the regulator that it is effectively ensuring that the safety systems are functioning as intended. Under the EPA RMP program, there is no regulatory requirement to reduce risks to ALARP. In addition, there is no requirement to submit to the regulator detailed information relating to risk reduction or hazard assessments. Finally, the Region 9 EPA RMP inspection team does not have the resources to fully audit petroleum refineries and other high hazard facilities subject to the RMP program. As a result, the EPA RMP program is not comprehensive or rigorous enough to control major accident hazards and reduce risks. Instead, facilities submit high-level summary information providing evidence that the activity- based requirements contained within the RMP regulations have been completed by the facility. 5.3 Unified Program Chevron’s Richmond refinery was also subject to process safety regulatory requirements at the county and city level. The facility had to adhere to additional requirements above the PSM and RMP regulations, but these requirements were not sufficient to prevent the Chevron incident. The following sections will discuss those county and city requirements. In 1993, Chapter 418, Statutes of 1993 (Senate Bill 1082) established Chapter 6.11 of the California Health and Safety Code (HSC), which required the Secretary of the California Environmental Protection Agency (Cal/EPA) to adopt regulations creating a “unified hazardous waste and hazardous materials management” regulatory program, or Unified Program, by January 1, 1996, to consolidate and make consistent six existing hazardous materials and hazardous waste programs within the state.424 The Secretary of Cal/EPA was charged with ensuring that the Unified Program was established and implemented by a Certified Unified Program Agency, or CUPA, in all counties in California. Cal/EPA adopted the Unified Program regulations under Title 27, Division 1 of the California Code of Regulations, which integrated six existing programs: the Hazardous Waste Generator and Onsite Hazardous Waste Treatment programs; the Aboveground Storage Tank program; the Underground Storage Tank program; the Hazardous Materials Release Response Plans and Inventory program; the California Accidental Release Prevention (CalARP) program; and the California Uniform Fire Code.425 The CalARP program, which was created through Assembly Bill AB1889 with the goal of major accident prevention, will be discussed at greater length below. There are currently 83 CUPAs in the state of California that implement the Unified Program at a local level.426 5.3.1.1 Contra Costa County Hazardous Materials Programs The Chevron Richmond Refinery is located in the City of Richmond, within Contra Costa County. The local CUPA responsible for implementing the Unified Program in all areas of the country is the Contra 424 California Health and Safety Code §25404(b) (1993). Also see http://www.calepa.ca.gov/cupa/Reports/2002/ReimbAcct.pdf (accessed May 16, 2013). 425 27 CCR §15100 (a)(1) through (6) (1994). 426 See http://www.calepa.ca.gov/cupa/Documents/2012/FactSheet.pdf (accessed May 16, 2013). 87

Chevron Richmond Refinery Regulatory Report October 2014

Costa Health Services’ Hazardous Materials Programs (CCHMP).427 CCHMP is responsible for implementing the Unified Program in all areas of Contra Costa County. CCHMP implements two programs that are relevant to this investigation: the CalARP program and the City of Richmond Industrial Safety Ordinance (RISO). CCHMP also implements the county’s own Industrial Safety Ordinance (ISO), which covers seven facilities. CCHMP has five full-time engineers, known as accidental release prevention engineers, who are responsible for implementing these programs for the county. While all have technical degrees in engineering, only two of these engineers have past refinery experience. 5.3.1.1.1 CalARP The California Health and Safety Code Article 2 (Chapter 6.95, Sections 25531 – 25543.3) was amended effective January 1, 1997, to implement EPA’s RMP program at the state level through the creation of the CalARP program regulations. Modeled after EPA’s RMP program and California’s Risk Management and Prevention Plan, which was enacted in 1986, the CalARP regulations (Title 19, Chapter 4.5 of the CCR) were implemented with the goal of preventing accidental releases of substances that can cause serious harm to the public and the environment, minimizing damage caused by a release, and to satisfy community right-to-know laws.428 California is one of at least three states that implement a state RMP program without delegation of the federal program from EPA.429 The CalARP regulations, including PHA requirements, are essentially duplicative in nature to EPA’s RMP program, with a few exceptions: the list of toxic chemicals covered is 276 instead of 77; the threshold quantities of some chemicals are smaller; CalARP requires a seismic analysis; and there is more interaction with the public and other agencies.430 The CalARP regulations require that businesses that produce, handle, process, distribute, or store certain chemicals over a certain threshold quantity develop a Risk Management Plan (RMP) and submit the RMP to a local CUPA for review. Like the EPA RMP program, facilities with a Program 3 process must develop a management system that includes a PHA and emergency response program.431 State oversight authority and responsibility for the CalARP program is with the California Emergency Management Agency.432 The CalARP regulations apply to roughly 45 facilities in Contra Costa County, including the Chevron refinery in Richmond. Each covered facility is required to submit an updated RMP to CCHMP at least once every five years.433 The group of CCHMP engineers reviews these plans and is required to 427 Contra Costa County’s Hazardous Materials program is responsible for responding to emergencies and monitoring hazardous materials in Contra Costa County. It is the duty of CCC to safeguard the Contra Costa County ecosystem from the release of hazardous materials and other pollutants. For more information see http://cchealth.org/hazmat/ (accessed May 21, 2013). 428 Information available at http://www.calema.ca.gov/HazardousMaterials/Pages/Accidental-Release-Prevention- (CalARP).aspx (accessed May 16, 2013). 429EPA OIG. Evaluation Report: EPA Can Improve Implementation of the Risk Management Program for Airborne Chemical Releases; February 10, 2009; p 20. 430 Information on differences between EPA’s RMP program and CalARP available at http://cchealth.org/hazmat/differences-rmp-calarp-iso.php (accessed May 16, 2013). 431 22 CCR §2735.5(f) (2004). 432The California Emergency Management Agency is responsible for the coordination of overall state agency response to major disasters in support of local government. For more information see http://www.calema.ca.gov/Pages/default.aspx (accessed May 21, 2013). 433 22 CCR §2745.10(a)(1) (2004). 88

Chevron Richmond Refinery Regulatory Report October 2014

“periodically audit RMPs”434 against the regulations to ensure compliance. This group has told the CSB that it audits each facility at least once every three years. It last audited Chevron in February 2011, and has been conducting another audit in October and November 2013. Although CCHMP is authorized to issue enforcement actions for violations uncovered during facility audits, in practice CCHMP engineers issue “ensure” action items that list the deficiencies and recommend improvements. They then work with the facility to make sure that these action items are implemented. CCHMP has rarely issued fines or citations to facilities for violations. If the engineers identify other gaps or areas for improvement that are not actual regulatory violations, they can issue “consider” action items, which are essentially suggestions to the facility for improvements that are not technically required to be implemented by the regulation. Whether these types of action items are issued is dependent upon the knowledge and experience of the engineer conducting the audit. Once CCHMP engineers have completed the audit, CCHMP issues a final audit report on the facility, which they also supply to Cal/OSHA’s PSM District Office and the EPA Region 9 RMP group. 5.3.1.1.2 Industrial Safety Ordinance The Contra Costa County Industrial Safety Ordinance (ISO) became effective January 15, 1999. Adopted as County Ordinance Chapter 450-8, the ISO expands on the CalARP program in Contra Costa County for facilities meeting the following criteria: 1) the facility is within an unincorporated area of the County; 2) the facility is either a petroleum refinery or chemical plant; 3) the facility is required to submit a Risk Management Plan (RMP) to the EPA and the Contra Costa County Health Service; and 4) the facility has at least one Program 3 process.435 Seven of the 45 CalARP facilities in the county are currently required to comply with the ISO requirements. The ISO was adopted to improve industrial safety by, among other things, requiring more comprehensive coverage of the whole facility rather than only certain processes; providing review, inspection, auditing and safety requirements more stringent than are currently in effect; requiring the development and implementation of a human factors program; and preventing and reducing the number, frequency and severity of accidental releases in Contra Costa County.436 Facilities subject to the ISO are essentially required to treat every process as subject to the CalARP Program 3 prevention program requirements. Covered facilities have additional requirements as well, including developing and implementing a human factors program, considering inherently safer technologies and systems for new and existing facilities or processes, submitting a safety plan to CCHMP, and conducting a Management of Organizational Change (MOOC) prior to changes in permanent staffing levels or reorganization in operations, maintenance, health and safety, or emergency response.437

434 22 CCR §2775.2(a) (2004). 435 See http://cchealth.org/hazmat/pdf/iso/2006_iso_official_code_complete.pdf (accessed January 13, 2014). 436 County Ordinance Chapter 450-8.004(a)(1) through (10) (2006). http://cchealth.org/hazmat/pdf/iso/2006_iso_official_code_complete.pdf (accessed January 13, 2014). 437 Information available at http://cchealth.org/groups/hazmat/industrial_safety_ordinance_risk_management.php (accessed May 22, 2013). 89

Chevron Richmond Refinery Regulatory Report October 2014

  1. 3.1.1.3 City of Richmond Industrial Safety Ordinance

On December 18, 2001, the City of Richmond adopted an Industrial Safety Ordinance (RISO) under Municipal Code Chapter 6.43 that was almost identical to the ISO. In February 2013, the City of Richmond Council amended the RISO to make it equivalent to the ISO. Chevron is one of two facilities subject to RISO requirements. Pursuant to an agreement with the City of Richmond, CCHMP implements and enforces the RISO within the city. Like the ISO, the RISO requires that a covered facility submit a safety plan to CCHMP that includes safety elements such as process safety information (PSI), operating procedures, mechanical integrity, employee participation, and management of change (MOC).438 CCHMP has posted a Safety Plan Guidance Document on its website to assist facilities in developing these plans. Each facility is also required to comply with safety requirements including performing PHAs, and must include a description of the manner of compliance with these in the safety plan.439 In performing a PHA, facilities are required to address the hazards of the process, identify any previous incident, identify controls applicable to the hazards, and identify consequences of failure of those controls, human factors, and a qualitative evaluation of a range of possible safety and health effects of failure of controls.440 The CCHMP engineers are required to review each facility’s safety plan as well as audit each facility to determine compliance with ISO or RISO. CCHMP engineers conduct the CalARP and ISO/RISO audits concurrently at each covered facility. CCHMP generally audits each facility once every three years. To aid in the auditing process, CCHMP engineers have entered all the CalARP program requirements into a database. They have taken each of these requirements and turned them into questions. When the engineers go onsite, they perform three main functions: 1) they identify and review any policy statement that directs how people should handle a particular piece of equipment; 2) they identify and review records of procedures, such as MOCs and permits; and 3) they randomly select and interview individuals about their familiarity with various aspects of different programs. If the engineers find a regulatory deficiency, they issue an ensure action item to the facility. Once the engineers have completed their facility audit, they issue a preliminary determination to the facility. The facility has 90 days to review the draft and provide a proposed remedy with specifics on how they will fix each deficiency, and the timeline. Once the report is finalized it goes out for public comment. Following public comment, it is issued to the facility and provided to Cal/OSHA’s PSM District Office and the EPA Region 9 RMP group. 5.3.1.2 Analysis Chevron submitted its most updated safety plan to CCHMP on February 25, 2013. Section 3.12 of the plan discusses PHAs and Action Items. Under this section, Chevron lists eight objectives of its PHAs, including identifying possible failures or releases, evaluating potential consequences, and proposing recommendations that would reduce the risks. Chevron also discusses its possible justifications for declining recommendations from PHAs, including the fact that an alternative measure would be sufficient, and that the recommendation may be infeasible. There was no additional information or 438 Richmond Municipal Code Section 6.43.090 (a) (2013). 439 Ibid at Sections (a) through (e) (2013). 440 Ibid at (d) (2013). 90

Chevron Richmond Refinery Regulatory Report October 2014

analysis contained in this section concerning the identification or control of hazards, or risk reduction, as there is no requirement to do so. The RISO and CalARP regulations require that PHAs list controls and possible consequences of failure of those controls, but there is no specific requirement to include evaluations of the safeguards and controls in the PHA. As CCHMP engineers are only required to audit against the regulatory requirements, they would only examine the evaluation of safeguards if such an evaluation were performed and documented in the facility’s PHAs. As noted previously, Chevron’s most recent crude unit PHA ineffectively listed qualitative safeguards for corrosion and mechanical integrity. While CCHMP engineers are able to issue “consider” action items to the facility recommending actions above and beyond regulatory requirements, CCHMP engineers did not do this regarding Chevron’s Crude Unit PHA or its evaluation of safeguards. After reviewing CCHMP’s most recent audit of Chevron, the CSB could find nothing referring to sulfidation corrosion, reduction of risk, or safeguard evaluation. While CCHMP is able to utilize these “consider” action items to encourage facilities to go above and beyond regulatory requirements to reduce risk, CCHMP engineers have stated to the CSB that they do not make sufficient use of this mechanism. Rather, they tend to audit against the existing regulatory requirements to ensure compliance. Unlike the safety case regulatory approach, which requires a reduction of risk to ALARP or equivalent, facilities covered by RISO or ISO are only required to “consider [emphasis added] the use of inherently safer systems in the development and analysis of mitigation items resulting from a process hazard analysis [PHA] and in the design and review of new processes and facilities.”441 Despite multiple internal recommendations to replace its piping due to the risk of sulfidation corrosion, Chevron failed to replace the piping prior to the incident with an inherently safer material. Again, the CSB has not found evidence that CCHMP effectively encouraged Chevron to go above and beyond regulatory requirements by utilizing inherently safer systems to reduce risk. As emphasized repeatedly in this report, a regulatory regime is only as strong as its regulators, and must employ individuals with the requisite skills, knowledge, and experience to provide sufficient oversight over facilities. In the case of CCHMP, there are only five engineers for nearly 45 facilities in the county, and only two have previous refinery experience.442 In addition, while the CCHMP is funded mostly through CUPA fees, ISO fees, and other means of cost recovery, the engineers are part of a bargaining unit and their salaries are paid through the county’s general fund, which has experienced annual budget reductions in the millions.443 This has unnecessarily resulted in a decrease in the CCHMP engineers’ salaries and has made it extremely difficult for CCHMP to fill a current position that has been open over three years because of its inability to offer competitive salaries to attract its engineers. Overall, CCHMP suffers from a lack of resources and funding, limiting its ability to hire additional highly qualified staff to oversee the petroleum refineries in Contra Costa County.

441 City of Richmond Municipal Code §6.43.050(g) (February 5, 2013). 442 Two of the other engineers have chemical plant experience and have led or participated in refinery compliance audits in the past ten years. 443 More information available at http://www.co.contra-costa.ca.us/DocumentCenter/Home/View/8917 (accessed May 23, 2013). 91

Chevron Richmond Refinery Regulatory Report October 2014

  1. 0 Conclusion

This report has focused on several attributes of more robust process safety management regulatory regimes from around the world that the CSB believes would greatly enhance existing federal and California process safety regulations. Some attributes discussed include: an enhanced process hazard analysis; continuous risk reduction to ALARP; active workforce participation; the effective use of process safety indicators that drive performance; regulatory assessment, verification, and intervention; and an independent, competent, well-funded regulator. These attributes together enable industry and the regulator to ensure that facilities are developing and implementing comprehensive, robust safety management systems to prevent major accidents. Implementation of a more comprehensive process safety management regulatory approach in California for petroleum refineries will require a commitment of extensive resources to fund a regulator that has the requisite skills, knowledge, and experience to ensure petroleum refineries in the state continually assess their practices and reduce risks to ALARP. However, the CSB believes that effective implementation of this regulatory approach will achieve greater major accident prevention in California and, in the process, provide greater protection for its workers and the public. An enhanced process safety management regulatory model provides the adaptability necessary to keep current with improving standards and advancing technology, without requiring lengthy and often unproductive rulemaking on the part of the regulator. A competent regulator will independently ensure that California refineries have taken all practical measures that can be reasonably taken to reduce risks. For example, the regulator would have the ability to work with these facilities to implement recommendations and lessons learned from significant petroleum refinery incidents throughout the world without requiring extensive rulemaking or legislation, as regulators have done post-incident in the UK, Norway, and Australia. (Additional information and discussion of the safety case type regime is included in Appendix C).

92

Chevron Richmond Refinery Regulatory Report October 2014

  1. 0 Process Safety Management Reform at the Federal Level: A

Path Forward

As this report discusses, process safety management in the US has undergone little reform since its inception in the 1990s despite advancing best practices and technology. On July 25, 2013, the CSB held a public meeting to discuss the status of three key CSB safety recommendations made to OSHA in the last decade to revise and improve the Process Safety Management (PSM) standard.444 While acknowledging some positive steps taken by OSHA, such as including process safety management in its regulatory agenda, the CSB expressed at the meeting its disappointment with OSHA’s lack of progress with implementation of open CSB recommendations to improve the PSM standard.445 As a result of the meeting, the Board voted to change the status of the three recommendations made to OSHA concerning the PSM standard to “Open-Unacceptable”.446

Recent significant incidents such as the April 2013 explosion and fire that occurred at a fertilizer storage and distribution facility in West, Texas, and resulted in fifteen fatalities and hundreds of injuries, have resulted in an increased national dialogue on the issue of process safety management reform.447 As mentioned in Section 2.0 above, President Obama has issued a number of Executive Orders focused on improving chemical safety in the US. On January 18, 2011, President Obama issued Executive Order 13563,448 which called for improvements in the nation’s regulatory system to promote predictability and reduce uncertainty and to use the best, most innovative, and least burdensome tools for achieving regulatory ends. 444 The CSB made a fourth recommendation (2001-01-H-R1) to OSHA in its 2002 reactive hazards study to modify the PSM standard to more comprehensively manage reactive hazards. On January 28, 2004, the Board voted unanimously to designate the status of this recommendation as “Open-Unacceptable”. 445 For a copy of the public meeting transcript see http://www.csb.gov/assets/1/7/0725CSB-OSHA_(2).pdf (accessed October 27, 2014). 446 “Open-Unacceptable” means that the recommendation recipient responds by expressing disagreement with the need outlined in the recommendation. The Board believes, however, that there is enough supporting evidence to ask the recipient to reconsider. The three open recommendations concerning the PSM standard are: 1) Recommendation to ensure coverage under the Process Safety Management (PSM) standard for atmospheric storage tanks that could be involved in a potential catastrophic release as a result of being interconnected to a covered process with 10,000 pounds of a flammable substance. The recommendation was issued in 2002 following the CSB’s investigation of a 2001 explosion of a poorly maintained, corroded storage tank containing spent sulfuric acid and flammable hydrocarbons at the Motiva refinery in Delaware City, Delaware. A worker was conducting hot work which ignited vapor through holes in the deteriorated tank. 2) Recommendation to revise the PSM standard to require management of change (MOC) reviews for organizational changes such as mergers and acquisitions that may impact process safety. This recommendation, issued in 2007, followed the 2005 explosions and fire at the BP Texas City refinery which killed 15 workers and injured 180 others. 3) Recommendation that OSHA issue a fuel gas safety standard for construction and general industry. This recommendation, issued in June 2010 followed two catastrophic accidents that occurred that year: In one, an explosion caused a roof collapse at the ConAgra Slim Jim facility in Garner, North Carolina, killing four workers and injuring 67 others. A worker had been attempting to purge new natural gas piping during the installation of an industrial water heater, resulting in a large release of natural gas indoors. In the other, at the Kleen Energy power plant in Middletown, Connecticut, high pressure natural gas was being used to clean new piping and was released in a congested outdoor area. It ignited, killing six workers and injuring at least 50. 447 See CSB investigation of West, Texas, fertilizer incident at http://www.csb.gov/west-fertilizer-explosion-and- fire-/ (accessed October 27, 2014). 448 Improving Regulation and Regulatory Review. Exec. Order No. 13563, 76 Fed. Reg. 14 (January 21, 2011). http://www.archives.gov/federal-register/executive-orders/2011.html (accessed July 10, 2013). 93

Chevron Richmond Refinery Regulatory Report October 2014

Following the incident in West, Texas, President Obama issued Executive Order 13650, Improving Chemical Facility Safety and Security , on August 1, 2013.449 The Executive Order established the Chemical Facility Safety and Security Working Group, a working group of federal agencies450 tasked with, among other things, developing options for enhancing and modernizing policies, regulations, and standards to improve the safety and security of chemical facilities.451, 452

Consistent with Executive Order 13650, both OSHA and the EPA issued Requests for Information, or RFIs, in the last year, requesting comment on potential revisions to several standards, including the Process Safety Management (Standard) and the Risk Management Plan (RMP) Program regulations, respectively.453 These are all positive steps toward significant improvements in process safety management at the federal level. CSB Chairperson Rafael Moure-Eraso has publicly advocated for Executive Order 13650 implementation, including requirements for safer technologies, regulation of reactive chemicals like the ammonium nitrate stored at West's fertilizer site, public reporting of process safety indicators, and regulatory coverage for hazardous oil drilling and production operations.454

The CSB believes that it is important to continue to build upon this significant national dialogue. In the coming months, the CSB will consider adding the issue of federal process safety management reform and modernization to its Most Wanted Chemical Safety Improvements Program (“Most Wanted Program”).455 The purpose of the Most Wanted Program is to: • identify the most important chemical safety improvement goals of the CSB in the form of a “Most Wanted List” of Chemical Safety Improvements, which will be based on recommendations resulting from CSB investigations, studies, hearings, and similar fact-finding activities;

449 Improving Chemical Facility Safety and Security. Exec. Order No. 13650, 78 Fed. Reg. 48029 (August 1, 2013). https://www.federalregister.gov/articles/2013/08/07/2013-19220/improving-chemical-facility-safety-and-security (accessed January 7, 2014). 450 The working group includes the EPA, the Department of Justice, the Department of Agriculture, the Department of Transportation, and the Department of Labor. 451 See Section 6 of the Executive Order. 452 The group has included the safety case regulatory model in a list of potential actions it may consider taking to improve chemical safety regulation. See Working Group response to Executive Order 13650, Section 6(a) – Solicitation of Public Input on Options for Policy, Regulation, and Standards Modernization. https://www.osha.gov/chemicalexecutiveorder/Section_6ai_Options_List.html (accessed January 7, 2014). 453 OSHA issued its RFI on potential revisions to its standards, including the PSM standard, on December 9, 2013 (at 78 FR 73756). The CSB issued its formal response to the RFI on March 31, 2014. View the CSB’s response at http://www.csb.gov/assets/1/16/CSB_RFIcomments.pdf (accessed October 27, 2014). The EPA issued its RFI on potential revisions to the RMP program regulations and related programs on July 31, 2014 (at 79 FR 44603). View the EPA RFI at https://www.federalregister.gov/articles/2014/07/31/2014-18037/accidental-release-prevention- requirements-risk-management-programs-under-the-clean-air-act-section (accessed October 27, 2014). Responses to the RFI are due on or before October 29, 2014. 454 Moure-Eraso, Rafael. Effective regulation of chemical industry still elusive since 1989 accident: The 25 years after disaster at Pasadena’s Phillips 66 plant have brought reform, but more vigilance needed. The Houston Chronicle; October 23, 2014. http://www.houstonchronicle.com/opinion/outlook/article/Moure-Eraso-Effective- regulation-of-chemical-5843582.php (accessed October 27, 2014). 455 The CSB adopted the Most Wanted Program on June 12, 2012. Board Order 046, Most Wanted Chemical Safety Improvements Program, discusses the policies of the program in detail. See http://www.csb.gov/assets/Record/Order_046_(06122012).pdf (accessed October 27, 2014). 94

Chevron Richmond Refinery Regulatory Report October 2014

• make efficient use of limited resources to pursue implementation of changes that are most likely to achieve important national-level safety improvements;

• focus special advocacy efforts by Board Members and staff on the Most Wanted List;

• inform the CSB’s deployment decisions and strategic allocation of staff resources; and

• issue periodic reports of the activities of the Program.

Consistent with Executive Order 13650, the CSB will also hold a public hearing to discuss the need for process safety management regulatory reform at the federal level. The public hearing will include discussion of various models for high hazard facility safety regulation from around the US and the world – including consideration of safety case type models. Presentations, or written comments, regarding various regimes should discuss, at a minimum, the following:

• The role of transparency and community involvement;

• The effectiveness of worker (union and non-union) involvement programs and the effectiveness of protecting workers from retaliatory actions;

• The methods for measuring process safety performance and for reporting of process safety indicator data (to regulators, the public, third parties, or industry groups);

• The approach used to strive for risk reduction and continuous improvement;

• The approach for establishing a “tolerable” risk level; and

• The effectiveness of enforcement methods.

The CSB will hold this public hearing in the Spring of 2015, following the publication of this report. Upon completion of the public hearing the CSB will publish a document summarizing the proceedings.

95

Chevron Richmond Refinery Regulatory Report October 2014

  1. 0 Recommendations

Pursuant to its authority under 42 U.S.C. §7412(r)(6)(C)(i) and (ii), and in the interest of promoting safer operations at California petroleum refineries and protecting workers and communities from future accidents, the CSB makes the following safety recommendations:

California State Legislature, Governor of California

2012-03-I-CA-R21

Based on the findings in this report, enhance and restructure California’s process safety management (PSM) regulations for petroleum refineries by including the following goal-setting attributes:

a. Require a comprehensive process hazard analysis (PHA) written by the company that includes:

i. Systematic analysis and documentation of all major hazards and safeguards, using the hierarchy of controls to identify hazards and significantly reduce risks to a goal of as low as reasonably practicable (ALARP) or similar;

ii. Documentation of the recognized methodologies, rationale and conclusions used to claim that inherently safer systems have been implemented to as low as reasonably practicable (ALARP) or similar, and that additional safeguards intended to control remaining hazards will be effective;

iii. Documented damage mechanism hazard review conducted by a diverse team of qualified personnel. This review shall be an integral part of the process hazard analysis (PHA) cycle and shall be conducted on all covered processes, piping circuits and equipment. The damage mechanism hazard review shall identify potential process damage mechanisms and consequences of failure, and shall ensure effective safeguards are in place to prevent or control hazards presented by those damage mechanisms. Require the analysis and incorporation of applicable industry best practices and inherently safer design to the greatest extent feasible into this review; and iv. Documented use of inherently safer systems analysis and the hierarchy of controls to the greatest extent feasible in establishing safeguards for identified process hazards. The goal shall be to drive the risk of major accidents to As Low As Reasonably Practicable (ALARP) or similar. Include requirements for inherently safer systems analysis to be automatically triggered for all management of change (MOC) and process hazard analysis (PHA) reviews, as well as prior to the construction of new processes, process unit rebuilds, significant process repairs, and in the development of corrective actions from incident investigation recommendations.

96

Chevron Richmond Refinery Regulatory Report October 2014

b. Require a thorough review of the comprehensive process hazard analysis by technically competent regulatory personnel;

c. Require preventative audits and preventative inspections by the regulator to ensure the effective implementation of the comprehensive process hazard analysis (PHA);

d. Require that all safety codes, standards, employer internal procedures and recognized and generally accepted good engineering practices (RAGAGEP) used in the implementation of the regulations contain adequate minimum requirements;

e. Require mechanisms for the regulator, the refinery, and workers and their representatives to play an equal and essential role in the direction of preventing major incidents. Require an expanded role for workers in management of process safety by establishing the rights and responsibilities of workers and their representatives on health and safety-related matters, and the election of safety representatives and establishment of safety committees (with equal representation between management and labor) to serve health and safety-related functions. The elected representatives should have a legally recognized role that goes beyond consultation in activities such as the development of the comprehensive process hazard analysis, implementation of corrective actions generated from hierarchy of control analyses, management of change, incident investigation, audits, and the identification, prevention, and control of all process hazards. The regulation should provide workers and their representatives with the authority to stop work that is perceived to be unsafe until the employer resolves the matter or the regulator intervenes. Workforce participation practices should be documented by the refinery to the regulator;

f. Require reporting of information to the public to the greatest extent feasible, such as a summary of the comprehensive process hazard analysis (PHA) which should include a list of inherently safer systems implemented; safeguards implemented for remaining hazards; standards utilized to reduce risks to As Low As Reasonably Practicable (ALARP) or similar; and process safety indicators that demonstrate the effectiveness of the safeguards and management systems;

g. Implement an approach or system that determines when new or improved industry standards and practices are needed and initiate programs and other activities, such as an advisory committee or forum, to prompt the timely development and implementation of such standards and practices; and

h. Ensure that a means of sustained funding is established to support an independent, well-funded, well- staffed, technically competent regulator.

2012-03-I-CA-R22

Implement a compensation system to ensure the regulator has the ability to attract and retain a sufficient number of employees with the necessary skills and experience to ensure regulator technical competency at all levels of process safety regulatory oversight and policy development in California. A market analysis and benchmarking review should be periodically conducted to ensure the compensation system remains competitive with California petroleum refineries. 97

Chevron Richmond Refinery Regulatory Report October 2014

2012-03-I-CA-R23 Work with the regulator, the petroleum refining industry, labor, and other relevant stakeholders in the state of California to develop and implement a system that collects, tracks, and analyzes process safety leading and lagging indicators from refineries and contractors to promote continuous safety improvements. At a minimum, this program shall: a. Require the use of leading and lagging process safety indicators to actively monitor the effectiveness of process safety management systems and safeguards for major accident prevention. Include leading and lagging indicators that are measureable, actionable, and standardized. Require that the reported data be used for continuous process safety improvement and accident prevention; b. Analyze data to identify trends and poor performers and publish annual reports with the data at facility and corporate levels; c. Require companies to publicly report required indicators annually at facility and corporate levels; d. Use process safety indicators (1) to drive continuous improvement for major accident prevention by using the data to identify industry and facility safety trends and deficiencies and (2) to determine appropriate allocation of regulator resources and inspections; and e. Be periodically updated to incorporate new learning from world-wide industry improvements in order to drive continuous major accident safety improvements in California.

Mayor and City Council, City of Richmond, California

2012-03-I-CA-R24

Implement or cause to be implemented a compensation system to ensure the regulator has the ability to attract and retain a sufficient number of employees with the necessary skills and experience to ensure regulator technical competency at all levels of process safety regulatory oversight and policy development in Richmond, California. A market analysis and benchmarking review should be periodically conducted to ensure the compensation system remains competitive with California petroleum refineries.

98

Chevron Richmond Refinery Regulatory Report October 2014

Board of Supervisors Contra Costa County, California

2012-03-I-CA-R25

Implement a compensation system to ensure the regulator has the ability to attract and retain a sufficient number of employees with the necessary skills and experience to ensure regulator technical competency at all levels of process safety regulatory oversight and policy development in Contra Costa County, California. A market analysis and benchmarking review should be periodically conducted to ensure the compensation system remains competitive with California petroleum refineries.

99

Chevron Richmond Refinery Regulatory Report October 2014

References

Australian Safety and Compensation Council. Major Hazard Facilities Annual Situation Report; 2004. http://www.safeworkaustralia.gov.au/sites/SWA/about/Publications/Documents/475/MHFAnSituationRe port_2004.pdf (accessed May 8, 2013).

Baker, J. The Report of the BP U.S. Refineries Independent Safety Review Panel, 2007.

Buncefield Major Incident Investigation Board. Recommendations on the design and operation of fuel storage sites; March 2007. http://www.buncefieldinvestigation.gov.uk/reports/recommendations.pdf (accessed May 21, 2013).

Center for Chemical Process Safety (CCPS). Guidelines for Developing Quantitative Safety Risk Criteria; August 2009.

Center for Chemical Process Safety (CCPS). Guidelines for Process Safety Metrics; October 2009.

Center for Chemical Process Safety (CCPS). Guidelines for Risk Based Process Safety; March 2007.

Center for Chemical Process Safety (CCPS). Inherently Safer Chemical Processes – A Life Cycle Approach; 2nd ed., December 2008.

Department of Energy. The Public Inquiry into the Piper Alpha Disaster; Presented to Parliament by the Secretary of State for Energy by Command of her Majesty; November 1990.

Dole, Elizabeth. Phillips 66 Company Houston Chemical Complex Explosion and Fire: Implications for Safety and Health in the Petrochemical Industry, A Report to the President; April 1990. http://ncsp.tamu.edu/reports/phillips/first%20part.pdf (accessed August 6, 2013).

EPA OIG. Evaluation Report: EPA Can Improve Implementation of the Risk Management Program for Airborne Chemical Releases; February 10, 2009.

EPA OIG. Improvements Needed in EPA Training and Oversight for Risk Management Program Inspections; March 21, 2013. http://www.epa.gov/oig/reports/2013/20130321-13-P-0178.pdf (accessed June 11, 2013).

GAO. Workplace Safety and Health: Multiple Challenges Lengthen OSHA’s Standard Setting; April 19,

  1. http://gao.gov/assets/600/590210.pdf (accessed June 12, 2013).

Hopkins, Andrew. Disastrous Decisions: The Human and Organisational Causes of the Gulf of Mexico Blowout; CCH Australia Limited, 2012.

Hopkins, Andrew. Lessons from Esso’s Gas Plant Explosion at Longford; Australian National University [Online]. 100

Chevron Richmond Refinery Regulatory Report October 2014

http://www.sirfrt.com.au/Meetings/IMRt/Southeast/IMRt%20East%2000Nov30/Andrew%20Hopkins%2 0presentation/Lonford%20talk.PDF (accessed May 8, 2013).

Hopkins, Andrew. Managing Major Hazards: The Lessons of the Moura Mine Disaster; National Library of Australia, 1999;.

Hopkins, Andrew. The Meaning of “Safety Case”; February 2013.

HSE. A Guide to the Offshore Installations (Safety Case) Regulations 2005: Guidance on Regulations;

  1. http://www.hse.gov.uk/pubns/priced/l30.pdf (accessed May 7, 2013).

HSE. Assessment Principles for Offshore Safety Cases (APOSC); March 2006. http://www.hse.gov.uk/offshore/aposc190306.pdf (accessed August 6, 2013).

HSE. Assessing compliance with the law in individual cases and the use of good practice; May 2003. http://www.hse.gov.uk/risk/theory/alarp2.htm (accessed June 12, 2013).

HSE. Developing process safety indicators: A step-by-step guide for chemical and major hazard industries; 2006. http://www.hse.gov.uk/pubns/books/hsg254.htm (accessed May 28, 2013).

HSE. Planning to do business in the UK offshore oil and gas industry? What you should know about health and safety; October 2011. http://www.hse.gov.uk/offshore/guidance/entrants.pdf (accessed June 5, 2013).

HSE. Play your part! How offshore workers can help improve health and safety; 2013. http://www.hse.gov.uk/pubns/indg421.pdf (accessed June 17, 2013).

Oil & Gas UK. Piper Alpha: Lessons Learnt; 2008. Process Safety Leadership Group. Safety and environmental standards for fuel storage sites; London,

  1. http://www.hse.gov.uk/comah/buncefield/fuel-storage-sites.pdf (accessed August 1, 2013).

Process Safety Leadership Group. Safety and environmental standards for fuel storage sites; London,

  1. http://www.hse.gov.uk/comah/buncefield/fuel-storage-sites.pdf (accessed August 1, 2013).

TAF Powell, SPE, UK Health & Safety Executive. US Voluntary Semp Initiative: Holy Grail or Poisoned Chalice? Proceedings of the Offshore Technology Conference, Houston, Texas, May 8-9, 1996.

The Competent Authority. Buncefield: Why did it happen? The underlying causes of the explosion and fire at the Buncefield oil storage depot, Hemel Hempstead, Hertfordshire on 11 December 2005; February 2011. http://www.hse.gov.uk/comah/buncefield/buncefield-report.pdf (accessed May 21, 2013).

101

Chevron Richmond Refinery Regulatory Report October 2014

Wilson, Michael P. Refinery Safety in California: Labor, Community and Fire Agency Views; Summary Report for Office of Governor Jerry Brown, Interagency Task Force on Refinery Safety; March 27, 2013, Revised June 4, 2013. Citing Zimgast, Erst. (June 6, 2006). Selective U/W in Oil-Petro Segment: Loss Burden in Different Regions, USA vs. Rest of the World, History of Selective U/W, Cause of Losses. Technical report-DRAFT-EXTRACT. Risk Engineering Services, Swiss Re. http://www.lohp.org/projects/refinery_safety.html (accessed July 8, 2013).

102

Chevron Richmond Refinery Regulatory Report October 2014

Appendix A: Significant Petroleum Refinery Incidents in 2012 1. Tank failure at the ExxonMobil refinery in Beaumont, Texas on 11 January 2. Vessel pressure excursion at the Flint Hills refinery in St. Paul, Minnesota on 22 January 3. Hydrogen Sulfide release from mechanical integrity failure at the Northern Tier Energy refinery in St. Paul, Minnesota on 26 January 4. Sulfuric acid release from a mechanical integrity failure at the ConocoPhillips refinery in Wood River, Illinois on 27 January 5. Hydrogen Sulfide release from mechanical integrity failure at the Marathon refinery in Garyville, Louisiana on 31 January 6. Hydrocarbon and hydrogen fluoride release from a mechanical integrity failure at the Flint Hills refinery in Corpus Christi, Texas on 31 January 7. Sulfur dioxide and hydrogen sulfide release following a vessel pressure excursion at the Alon refinery in Big Spring, Texas on 1 February 8. Hydrocarbon release from a vessel pressure excursion at the ConocoPhillips refinery in Belle Chasse, Louisiana on 1 February 9. Benzene release from a mechanical integrity failure at the Husky refinery in Lima, Ohio on 16 February 10. Fire at the Tesoro refinery in Salt Lake City, Utah on 17 February 11. Fire at the BP refinery in Cherry Point, Washington on 17 February 12. Tank failure at the Shell refinery in Deer Park, Texas on 22 February 13. Tank failure at the Paulsboro refinery in Paulsboro, New Jersey on 23 February 14. Fire at the Citgo refinery in Corpus Christi, Texas on 24 February 15. Hydrogen Sulfide release from a mechanical integrity failure at the Flint Hills refinery in Rosemount, Minnesota on 28 February 16. Vessel pressure excursion at the Motiva refinery in St. Charles, Louisiana on 28 February 17. Benzene release from a mechanical integrity failure at the Chalmette refinery in Chalmette, Louisiana on 28 February 18. Crude oil release from a mechanical integrity failure at the Flint Hills refinery in North Pole, Alaska on 4 March 19. Hydrogen fluoride release from a mechanical integrity failure at the Citgo refinery in Corpus Christi, Texas on 6 March 20. 1 worker was fatally injured and 2 other workers were burned at the Valero refinery in Memphis, Tennessee on 6 March 21. Fire during a hot work activity at the Tesoro refinery in Martinez, California on 7 March 22. Benzene release from a mechanical integrity failure at the Chevron refinery in Pascagoula, Mississippi on 8 March 23. Heavy oil release from a mechanical integrity failure at the Chevron refinery in Pascagoula, Mississippi on 13 March 24. Benzene release from a mechanical integrity failure at the Marathon refinery in Texas City, Texas on 14 March 25. Fire at the PBF Energy refinery in Delaware City, Delaware on 16 March 26. Hydrocarbon release from a mechanical integrity failure at the Chevron refinery in Pascagoula, Mississippi on 19 March 103

Chevron Richmond Refinery Regulatory Report October 2014

Hydrocarbon release from a mechanical integrity failure at the Tesoro refinery in Anacortes, Washington on 23 March

Hydrocarbon release from a mechanical integrity failure at the ExxonMobil refinery in Baytown, Texas on 24 March

Fire at the ExxonMobil refinery in Billings, Montana on 25 March

Hydrogen fluoride release from a mechanical integrity failure at the BP refinery in Texas City, Texas on 27 March

Hydrocarbon release from a mechanical integrity failure at the Total refinery in Port Arthur, Texas on 11 April

Fire at the ConocoPhillips refinery in Rodeo, California on 13 April

Hydrocarbon release from a mechanical integrity failure at the Flint Hills refinery in Corpus Christi, Texas on 16 April

Crane fell over and damaged utility piping at the Citgo refinery in Lemont, Illinois on 17 April

Hydrocarbon release from a mechanical integrity failure at the Flint Hills refinery in Corpus Christi, Texas on 19 April

Fire at BP refinery in Texas City, Texas on 20 April

Hydrocarbon release from a mechanical integrity failure at the ConocoPhillips refinery in Sweeny, Texas on 24 April

Fire at the Sunoco refinery in Philadelphia, Pennsylvania on 8 May

4 workers injured in fire at the Sinclair refinery in Sinclair, Wyoming on 8 May

Hydrocarbon release from a mechanical integrity failure at the LyondellBasell refinery in Houston, Texas on 8 May

Fire at the Sunoco refinery in Philadelphia, Pennsylvania on 9 May

Fire at the Motiva refinery in Port Arthur, Texas on 12 May

Hydrogen sulfide release from a mechanical integrity failure at the CVR Energy refinery in Wynnewood, Oklahoma on 11 May

Hydrogen fluoride release from a mechanical integrity failure at the Citgo refinery in Corpus Christi, Texas on 15 May

Hydrogen sulfide release from a mechanical integrity failure at the Shell refinery in Deer Park, Texas on 17 May

Benzene and hydrogen sulfide release from a mechanical integrity failure at the Flint Hills refinery in Corpus Christi, Texas on 21 May

Fire at the Montana Refining Company refinery in Great Falls, Montana on 24 May

Hydrocarbon release from a mechanical integrity failure at the Valero refinery in Memphis, Tennessee on 25 May

2 workers injured from a fire at the Sinclair refinery in Sinclair, Wyoming on 28 May

Propylene release from overpressure event at the PBF Energy refinery in Delaware City, Delaware on 29 May

Hydrocarbon release from a mechanical integrity failure at the Valery refinery in Houston, Texas on 31 May

Hydrogen and hydrocarbon release due to loss of containment event at the Shell refinery in Deer Park, Texas on 7 June 104 Chevron Richmond Refinery Regulatory Report October 2014

Hydrogen sulfide and hydrocarbon release due to flare failure at the Motiva refinery in Norco, Louisiana on 7 June

Fire at the Motiva refinery in Port Arthur, Texas on 9 June

Hydrocarbon release due to a mechanical integrity failure at the BP refinery in Texas City, Texas on 9 June

Fire at the ExxonMobil refinery in Torrance, California on 11 June

Fire at the Total refinery in Port Arthur, Texas on 13 June

Hydrogen sulfide release from a tank failure at the ConocoPhillips refinery in Rodeo, California on 15 June

Hydrocarbon release at the Shell refinery in Deer Park, Texas on 20 June

Fire at the BP refinery in Whiting, Indiana on 21 June

Hydrocarbon release due to a mechanical integrity failure at the Valero refinery in Corpus Christi, Texas on 23 June

Benzene release due to a mechanical integrity failure at the ExxonMobil refinery in Baton Rouge, Louisiana on 25 June

Benzene release due to a mechanical integrity failure at the ExxonMobil refinery in Baytown, Texas on 28 June

Propane release due to a mechanical integrity failure at the Valero refinery in McKee, Texas on 28 June

Sulfuric acid release due to a mechanical integrity failure at the Chevron refinery in El Segundo, California on 2 July

Hydrocarbon release due to a mechanical integrity failure at the Phillips 66 refinery in Westlake, Louisiana on 14 July

Fire at the Citgo refinery in Corpus Christi, Texas on 16 July

Fire at the Valero refinery in Meraux, Louisiana on 22 July

Sulfuric acid release due to a mechanical integrity failure at the Sunoco Point Breeze refinery in Philadelphia, Pennsylvania on 22 July

Fire at the BP refinery in Whiting, Indiana on 23 July

Hydrocarbon and hydrogen fluoride release due to a mechanical integrity failure at the Flint Hills refinery in Corpus Christi, Texas on 24 July

Fire at the HollyFrontier refinery in Tulsa, Oklahoma on 2 August

8,614 lbs of hydrogen sulfide were released to the atmosphere due to a mechanical integrity failure on a compressor suction line at the Chevron refinery in Richmond, California on 2 August.

Hydrogen sulfide release from an overpressure event at the Valero refinery in Texas City, Texas on 5 August

Fire at the Sinclair refinery in Sinclair, Wyoming on 5 August

Fire at the Chevron refinery in Richmond, California on 6 August

Fire at the Shell refinery in Martinez, California on 13 August

Hydrogen sulfide release from a mechanical integrity failure at the Shell refinery in Martinez, California on 14 August

2 workers injured from a fire at the BP refinery in Whiting, Indiana on 14 August

Hydrogen sulfide release due to a mechanical integrity failure at the Phillips 66 refinery in Wood River, Illinois on 22 August 105 Chevron Richmond Refinery Regulatory Report October 2014

Fire at the Sinclair refinery in Sinclair, Wyoming on 24 August

Hydrocarbon release due to a mechanical integrity failure at the LyondellBasell refinery in Houston, Texas on 25 August

Hydrocarbon release due to a mechanical integrity failure at the Flint Hills refinery in Corpus Christi, Texas on 26 August

Hydrogen sulfide and propylene release due to a mechanical integrity failure at the ExxonMobil refinery in Beaumont, Texas on 29 August

Fire at the Phillips 66 refinery in Rodeo, California on 29 August

A high pressure excursion in a vessel resulted in a hydrocarbon release with offsite consequences at the Holly refinery in Woods Cross, Utah on 30 August

Worker injured following a fire at the Marathon refinery in Detroit, Michigan on 5 September

Chemical release with offsite consequences at the Marathon refinery in Detroit, Michigan on 8 September

Sulfuric acid release due to a mechanical integrity failure at the Tesoro refinery in Martinez, California on 10 September

Carbon monoxide and hydrogen sulfide release due to a mechanical integrity failure at the ExxonMobil refinery in Baytown, Texas on 11 September

Hydrogen sulfide release due to a mechanical integrity failure at the Marathon refinery in Garyville, Louisiana on 11 September

Hydrocarbon release due to a mechanical integrity failure at the Chevron refinery in Pascagoula, Mississippi on 14 September

Unspecified leak at the Tesoro refinery in Martinez, California on 15 September

Hydrocarbon release due to a mechanical integrity failure at the PBF Energy refinery in Delaware City, Delaware on 21 September

Hydrogen sulfide release due to a mechanical integrity failure at the Motiva refinery in Norco, Louisiana on 24 September

2 workers killed from an explosion at the CVR Energy refinery in Wynnewood, Oklahoma on 28 September

Fire at the Motiva refinery in Convent, Louisiana on 1 October

Hydrogen fluoride release at the Placid refinery in Port Allen, Louisiana on 1 October

Hydrogen sulfide release from a high pressure excursion at the Valero refinery in Port Arthur, Texas on 1 October

Fire at the ExxonMobil refinery in Baytown, Texas on 3 October

Vapor cloud release at the Hess refinery in Port Reading, New Jersey on 3 October

Hydrocarbon release due to a mechanical integrity failure at the Phillips 66 refinery in Rodeo, California on 8 October

Fire at the Citgo refinery in Corpus Christi, Texas on 9 October

Vapor cloud release with offsite impact from the Kern Oil refinery in Bakersfield, California on 17 October

Hydrocarbon and hydrogen sulfide release from a pressure excursion at the ExxonMobil refinery in Joliet, Illinois on 19 October

Hydrocarbon release due to a mechanical integrity failure at the Citgo refinery in Sulfur, Louisiana on 22 October 106 Chevron Richmond Refinery Regulatory Report October 2014

Hydrogen sulfide release at the Chalmette refinery in Chalmette, Louisiana on 23 October

Fire at the Tesoro refinery in Martinez, California on 21 October

Fire at the BP refinery in Texas City, Texas on 30 October

Fire at the Valero refinery in Port Arthur, Texas on 3 November

Benzene release due to a mechanical integrity failure at the Shell refinery in Deer Park, Texas on 8 November

Vapor release at the Tesoro refinery in Martinez, California on 8 November

Hydrogen sulfide release due to a mechanical integrity failure or a high pressure excursion at the Shell refinery in Martinez, California on 24 November

Hydrogen sulfide and hydrocarbon release at the Northern Tier Energy refinery in St. Paul Park, Minnesota on 27 November

Benzene release due to a mechanical integrity failure at the ExxonMobil refinery in Baton Rouge, Louisiana on 1 December

Hydrogen fluoride release that killed one worker, injured 2 other workers and 7 emergency responders at the Valero refinery in Memphis, Tennessee on 3 December

Hydrocarbon release due to a mechanical integrity failure at the Flint Hills refinery in Corpus Christi, Texas on 5 December

Hydrogen sulfide release at the Phillips 66 refinery in Wood River, Illinois on 8 December

Fire at the Motiva refinery in Port Arthur, Texas on 11 December

Benzene release due to a mechanical integrity failure at the Alon refinery in Big Spring, Texas on 11 December

Hydrocarbon release due to a mechanical integrity failure at the Shell refinery in Deer Park, Texas on 11 December

Hydrocarbon release at the Shell refinery in Anacortes, Washington on 12 December

Hydrogen sulfide release due to a pressure excursion at the PBF Energy refinery in Paulsboro, New Jersey on 14 December

Hydrocarbon and hydrogen sulfide release due to a mechanical integrity failure at the Marathon refinery in Garyville, Louisiana on 15 December

Fire at the Motiva refinery in Port Arthur, Texas on 17 December Note -Incidents of hydrocarbon leaks into a cooling tower or releases to a flare system are not included in the above list. 107

Chevron Richmond Refinery Regulatory Report October 2014

Appendix B: Regulatory Comparison Table OSHA PSM Standard California PSM Standard The Safety Case Regulatory Regime Scope Covered processes excluding oil and gas well drilling and servicing Covered processes excluding oil and gas well drilling and servicing Applies to offshore and onshore oil and gas operations Specific PSM/ Major Accident Focus Yes Yes Yes ALARP or Equivalent No No Yes Adaptability to New or Revised Codes, Standards, Technology, Hazard Information, Lessons Learned, etc. Limited to RAGAGEP –only addresses equipment and mechanical integrity (2 of 14 elements); RAGAGEP not defined in the standard or a referenced list, only a handful of standards referenced as RAGAGEP in OSHA interpretation letters Limited to RAGAGEP – only addresses equipment and mechanical integrity; RAGAGEP not defined in the standard or a referenced list, only a handful of standards referenced as RAGAGEP in OSHA interpretation letters Yes via safety case and supporting framework legislation PSM Indicators Req. No No Yes for Companies Competent Regulator 50% or more Engineers/PSM OSHA-some progress but no Cal/OSHA – some progress but no Yes Sufficient Funding for Competent Regulatory staff OSHA-No California is increasing funding to support additional staff on Cal/OSHA PSM team Yes Hazard Analysis Required – “shall identify, evaluate, and control the hazards involved in the process.” Required – “appropriate to the complexity of the process for identifying, evaluating, and controlling hazards involved in the process.” Is a specific aspect of SC and supporting framework regulation and is required for all onshore and offshore facilities. To meet legislative goal-setting requirements, a structured risk assessment including HA as appropriate is required from all “employers.” 108

Chevron Richmond Refinery Regulatory Report October 2014

OSHA PSM Standard California PSM Standard The Safety Case Regulatory Regime Incident Investigation Requires a report but activity- based; requires including “any recommendations resulting from the investigations” (what if there are none?); system required to “resolve the incident report findings and recommendation; no explicit requirement to prevent a similar occurrence or controlling hazards. Requires a report including “any recommendations resulting from the investigation.” System required to “establish a system to promptly address and resolve the report findings and recommendations and…implement the report recommendations in a timely manner, or take action to prevent a reoccurrence.” Investigation of incidents required to demonstrate legal compliance with framework legislation. ‘Reasonably practicable’ requirement would require remedial action and cross company learning from incident investigations. HSE can require SC duty holder compliance with investigation report recommendations (e.g. Buncefield Report-“determine SIL level requirements for overfill protection”) Management of Change Activity-based; the employer “shall establish and implement written procedures to manage changes;” “the procedures shall assure the following considerations are addressed…impact of change on safety and health;” no formal hazard analysis required; no requirement that the identified safety impacts or hazards be controlled. Activity-based: the employer “shall establish and implement written procedures to manage changes…;” “the procedures shall assure that the following are addressed prior to any change…technical basis for proposed change; impact of change on safety and health;” no formal hazard analysis required; no requirement that the identified safety impacts or hazards be controlled. Description of MOC procedures and demonstrations of their effectiveness in managing major accident hazard risk are a key requirement of the safety case. 109

Chevron Richmond Refinery Regulatory Report October 2014

OSHA PSM Standard California PSM Standard The Safety Case Regulatory Regime Workforce Participation “Employers shall develop a written plan of action regarding the implementation of the employee participation;” Employers shall consult with employees and their representatives on the conduct and development of PHAs and the other elements of PSM in this standard.” “Employer shall develop a written plan of action to ensure employee participation in process safety management;” includes employer consultation with employees and their representatives on the conduct and development of the elements of process safety management required by this section; and providing employees and their representatives with access to all information required to be developed by this section…” Provides for the election of protected safety representative positions and safety committees. Inherent Safety No No Yes

110

Chevron Richmond Refinery Regulatory Report October 2014

Appendix C: Frequently Asked Questions (FAQs) Regarding the Safety Case Regulatory Approach

  1. Is it true that the safety case regulatory approach leads to self-regulation by industry?

Critics of the safety case regulatory approach have noted that this type of regulatory regime is likely to result in mere industry self-regulation.456 Critics have also noted that this is at least partly due to the fact that there is no will in the US to ensure that regulators have the tools, resources, and competence to effectively regulate workplaces. The CSB and those with experience in developing and implementing the safety case regulatory regime have repeatedly stated that the purpose of the safety case regulatory approach is to ensure that all hazards have been identified, evaluated, and controlled so that risks are reduced to as low as reasonably practicable, or ALARP. In simple terms, the safety case report is a series of claims as to how an installation is being safety operated. The real strength of the safety case regulatory regime is testing the validity of those claims through strategic intervention by competent, well-funded regulators. Advanced performance-based regulatory regimes in the United Kingdom (UK) and Norway, for example,457 incorporate a list of regulator-accepted standards and good practices that provide companies with the minimum performance that is expected. Companies must demonstrate that they meet or exceed those standards. Therefore, companies are aware of minimum performance expectations they must meet as they work to reduce risks to ALARP. If a competent regulator is not in place, then the safety case report equates to nothing more than a lifeless document sitting on a shelf, and the criticism of self-regulation becomes valid.

It is also important to point out that in a letter from the USW Local 5 to the CSB dated November 22, 2013, it was stated that “[t]he current system is truly a self regulated system, with the industry setting the rules, changing the rules, and monitoring themselves.” Individuals are noting that the current system in place has actually led to self-regulation despite the intent of the PSM standard and RMP program to be performance-based.

Critics have also argued that there is a lack of transparency with the safety case regime. However, under the existing PSM standard, none of the PSM elements are made public by the company or the regulator, including the process hazard analyses and management of change documents. To improve transparency, many safety case regimes collect and report indicator data, and companies are required make safety case report summaries publicly available. These are high level documents that are published online and summarize safety assessments, hazardous materials, hazards and control measures, potential major incidents, emergency response, and safety management systems.

Rather than accepting the inevitability of catastrophic events, we should act to prevent them from happening. As discussed in this report, there is a movement in California to improve oversight of 456 See e.g. Rena Steinzor. Lessons from the North Sea: Should “Safety Cases” Come to America? Vol. 38: 417; 2011; p 439. Available at http://papers.ssrn.com/sol3/papers.cfm?abstract_id=1735537 (accessed September 4, 2013). 457 Norway requires many similar aspects of a safety case regime offshore but there are differences in implementation and style and content of the regulations. The UK implements a safety case regime both onshore and offshore. 111

Chevron Richmond Refinery Regulatory Report October 2014

petroleum refineries. There has also been increased dialogue in the US in recent years surrounding the regulation of the oil and gas industry and how to make improvements. As such, the support exists to not only shift the current activity-based regulatory structure to a more goal-based safety case regulatory regime, but to also ensure that competent, well-funded regulators are in place to implement and enforce such a regime.

rulemaking under the Administrative Procedure Act? The Administrative Procedure Act, or APA, was passed in 1947, and lays out the basic framework under which federal rulemaking is conducted. It defines “rule” as “the whole or a part of an agency statement of general or particular applicability and future effect designed to implement, interpret, or prescribe law or policy or describing the organization, procedure, or practice requirements of an agency…”458 “Rulemaking” is defined as the “agency process for formulating, amending, or repealing a rule.”459 Federal agencies often impact their specific area of jurisdiction by publishing rules promulgated through notice and comment rulemaking, or informal rulemaking, under the APA. Unfortunately, as this report discusses at length, the rulemaking process in the US is cumbersome and some federal agencies, such as OSHA and the EPA, are subject to additional requirements and more stringent review standards that go above and beyond those contained in the APA. To avoid these additional burdens, many agencies provide further guidance to regulated parties through more informal means, such as answering questions and issuing policy statements, guidance, or opinion letters. Another way to lessen the burden on regulating agencies and their regulated entities is to adopt performance or goal-based regulations rather than prescriptive regulations. Performance-based standards state the objective or outcome to be achieved, such as risk reduction, without describing the specific means of obtaining that objective. This provides the regulated entities with the freedom and flexibility to work to achieve a stated goal, such as reducing risks to as low as reasonably practicable, or ALARP, through their chosen and preferred means.460 Performance-based standards also provide flexibility to the regulator; for example, in a safety case regulatory regime, should the regulator determine through assessment of the safety case report and/or inspection that the facility has not reduced risks to ALARP with regard to a specific hazard, he or she may require that the facility take additional steps to further reduce risk without needing to propose and adopt a new rule or regulation to address it. The regulator must accept the safety case report in order for the facility to operate.

The Regulatory Flexibility Act was passed in 1980 during the Carter Administration. It requires agencies to prepare and make available for public comment regulatory flexibility analyses of proposed rulemaking, and also encourages agencies to consider alternatives to rulemaking, including “the use of performance rather than design standards…”461 Executive Order 13272 then directed federal agencies to establish procedures and policies to comply with the Act.462 Federal agencies have been encouraged to adopt 458 5 U.S.C. §551(4) (2011). 459 5 U.S.C. §551(5) (2011). 460 Such as reliance upon qualitative assessments, quantitative assessments, semi-quantitative risk assessments, and good practice guidance. 461 5 U.S.C. §603(3) (2010). 462 Exec. Order No. 13272, 67 Fed. Reg. 159 (August 13, 2002). http://www.gpo.gov/fdsys/pkg/FR-2002-08- 16/pdf/02-21056.pdf (accessed September 24, 2013). 112

Chevron Richmond Refinery Regulatory Report October 2014

performance-based standards in the US for decades. Recognizing the inefficient process of federal rulemaking in the US, President Clinton signed Executive Order 12866 in September of 1993, which, among other things, directed federal agencies to “identify and assess alternative forms of regulation…[and] specify performance objectives, rather than specifying the behavior or manner of compliance that regulated entities must adopt.”463 Executive Order 13563, entitled Improving Regulation and Regulatory Review, supplemented and reaffirmed Executive Order 12866 by ordering agencies to “identify and consider regulatory approaches that reduce burdens and maintain flexibility and freedom of choice for the public.”464 Its stated goal was to “protect public health, welfare, safety, and our environment while promoting economic growth, innovation, competitiveness, and job creation.”465 Its seven guiding principles are as follows: • Increase predictability and reduce uncertainty; • Use and rely on best available science; • Ensure public participation and open exchange of ideas; • Use the most innovative and least burdensome tools; • Consider cost benefit analysis (quantitative and qualitative); • Ensure regulations are publicly available, consistent, written in plain language and easy to understand; and • Measure results and seek to improve actual results.466

The safety case regime aims to satisfy all of these principles.

California has adopted its own version of the APA, known as the California Administrative Procedure Act (CAPA) (California Government Code §11340 et seq.).467 Among its many requirements for California state agencies that adopt regulations, CAPA directs them to consider the substitution of performance standards for prescriptive standards.468 CAPA defines “performance standard” as “a regulation that describes an objective with the criteria stated for achieving the objective.”469

Federal agencies that are engaged in and responsible for regulating high hazards, such as NASA and the Nuclear Regulatory Commission (NRC), have adopted goal or performance-based standards that require risks to be reduced to “as safe as reasonably practicable” (ASARP) and “as low as reasonably achievable,” (ALARA), respectively. The OSHA Process Safety Management (PSM) standard also contains performance-based elements to some extent; for example, it provides regulated entities with flexibility in how to perform a process hazard analysis (PHA). However, it contains no risk reduction goals such as ALARP. This has resulted in an activity-based regulatory scheme that emphasizes completing activities, such as a PHA or a Management of Change (MOC) analysis, rather than actual risk reduction. Without a risk reduction goal such as ALARP in place, the PSM standard will not have the 463 Exec. Order No. 12866, 48 Fed. Reg. 190 (September 30, 1993). http://www.archives.gov/federal- register/executive-orders/pdf/12866.pdf (accessed September 24, 2013). 464 Exec. Order No. 13563, 76 Fed. Reg. 14 (January 21, 2011). http://www.gpo.gov/fdsys/pkg/FR-2011-01- 21/pdf/2011-1385.pdf (accessed September 24, 2013). 465 Ibid. 466 Ibid. 467 Available at http://www.oal.ca.gov/administrative_procedure_act.htm (accessed September 18, 2013). 468 California Government Code, §11340.1(a) (1995). 469 California Government Code, §11342.570 (1995). 113

Chevron Richmond Refinery Regulatory Report October 2014

ability to successfully drive continuous improvement and adaptation of industry safety management advances.

less than other regions and unionization rates are lower than other countries? A majority of the workforce in California petroleum refineries is unionized, as the unionization rate for the 14 petroleum refineries in California is actually 73 percent,470 which is significantly higher than the 2012 rates for the US as a whole (11.1 percent), Australia (17.9 percent), the UK (25.8 percent), and Norway (54.7 percent).471 Despite a declining unionization rate in the UK, the region has developed strong onshore and offshore regulations that provide for the creation of protected safety representative positions and safety committees for unionized and non-unionized facilities. These positions are meant to create a healthier and safer workplace, and result in better decision-making regarding health and safety, increased productivity, higher workforce motivation, a stronger commitment to implementing decisions or actions (as employees have been actively involved in reaching these decisions), and greater cooperation and trust.472 The HSE has devoted extensive time and resources to ensuring employers are complying with these regulations and understand the importance and benefits of involving workers in health and safety-related matters.

The UK also has a standard establishing the minimum level of training that elected safety representatives offshore should receive to enable them to fully perform their functions as defined in the Safety Representatives and Safety Committees Regulations – SI 1989/971. This training standard, entitled the OPITO Approved Standard, was developed by an industry workgroup facilitated by OPITO.473 In June 2013, Det Norske Veritas (DNV)474 became accredited by OPITO to offer newly developed training courses to more than 2,000 elected safety representatives in the offshore industry. The training, which has been driven and supported by HSE, Oil and Gas UK, and the Offshore Industry Advisory Committee’s Workforce Involvement Group, consists of four separate Modules run over the course of eight days.475 The training covers topics such as Understanding and Identifying Major Accident Hazards and Investigating Incidents and Applying Root Cause Analysis.

The CSB recognizes the HSE’s effort to improve workforce involvement through regulations, protected positions, and training, and has recommended in this report that California develop regulations and guidelines to establish similar protected safety positions to ensure effective workforce participation. The 470 In September 2013, the USW provided the CSB with a list of California petroleum refinery locations as of October 2012 and the existing unionization representation at those refineries. Of the 15 petroleum refineries operating in California as of October 2012, 11 of those were unionized, with USW providing the union representation at all 11 facilities. 471 For complete statistics on trade union density for countries around the world see http://stats.oecd.org/Index.aspx?QueryId=20167 (accessed September 5, 2013). 472 HSE. Consulting employees on health and safety: A brief guide to the law. 2013; p 2. http://www.hse.gov.uk/pubns/indg232.pdf (accessed September 5, 2013). 473 OPITO is an industry-owned non-profit that serves the needs of the oil and gas industry in the UK and around the world. See http://www.opito.com/ (accessed September 10, 2013). 474 DNV is an independent foundation headquartered in Oslo, Norway, that provides services for managing risk around the world. For more information see http://www.dnv.com/ (accessed September 10, 2013). 475 http://www.marinelink.com/news/launches-offshore355749.aspx (accessed September 10, 2013). 114

Chevron Richmond Refinery Regulatory Report October 2014

CSB believes the HSE model can also be effective in the US as these regulations require effective safety representation regardless of unionization rates.

The CSB has identified a small number of independent studies conducted on the impact of the safety case regulatory approach on safety performance onshore and offshore. In 1999, a report commissioned by the HSE (“the Aberdeen Report”) which evaluated the impact of the offshore Safety Case Regulations on offshore safety was published.476 One of the purposes of the study was to review published safety data for trends in offshore accidents and incidents from 1990 until 1997.477 Upon this review, it was determined there had been a decrease in accidents since the implementation of the offshore safety case regulations in the UK, but cautioned it was difficult to distinguish the effect of the safety case regulations from other industry activities such as the level and type of exploration and production activity, oil prices, and industry-led initiatives.478 The Aberdeen Report also cautioned about the difficulties in analyzing offshore data that also hold true for the more current data presented in Figure 3. The total number of accidents and incidents recorded can be affected by industry attitudes toward reporting, changes in how and what data is reported, and the decrease or increase in offshore activity. As stated in the Aberdeen Report, “[d]espite these cautions, accident statistics play an important role in the analysis of the state of safety in any industry, since accidents represent the ‘bottom line’ in safety. It is therefore important to analyze the trends, but to also take the drawbacks into consideration.”479 As discussed in this report, the reporting and analyzing leading process safety indicators is important to gain a better understanding of how safety management systems are functioning, and thus a better idea of how well the various regimes are managing hazards and mitigating risk. Statistics from the seven years covered by the Aberdeen Report indicated an overall decrease in reported accident rates in the UK and Norwegian databases up until 1994. From 1994 to 1997, both the UK and Norway reported a slight increase in the number of reported accidents.480 Norway did report a drop in 1997 from 1996. The decrease reported up until 1994 for the UK appeared to be independent of the offshore production activities as those levels had been on the increase during the same time period. Drilling in the UK decreased during the same time frame, making the cause for the decrease in reported drilling accidents unclear. More recent reviews of accident data indicate decreasing trends in accident statistics. The Presidential Oil Spill Commission noted the following in its report to the President on the Macondo disaster: [f]rom 2004 to 2009, fatalities in the offshore oil and gas industry were more than four times higher per person-hours worked in U.S. waters than in European waters, even though many of the same companies work in both venues. This striking statistical discrepancy reinforces the view that the problem is not an inherent trait of the business itself, but rather 476 Evaluation of the Offshore Safety Legislative Regime—A study undertaken by AUPEC Ltd. For the Safety Policy Division, Health & Safety Executive, Ref: 8938/3714, June 1999. 477 Ibid at Ch 7. 478 Ibid at Ch 7, p 7-1. 479 Ibid at Ch. 7, p 7-11. 480 This was based on the number of accidents per million man hours for the two Continental Shelves (Ibid, Figure 7.8) 115

Chevron Richmond Refinery Regulatory Report October 2014

depends on the differing cultures and regulatory systems under which members of the industry operate.481

In September 2013, Det Norske Veritas (DNV)482 released a position paper discussing necessary improvements to reduce risk of major offshore accidents, and noted in the report that “there are no good globally accepted metrics for major accident hazards…”483 However, DNV was able to point to UK HSE’s Hydrocarbon Releases Database System (HCR)484 in the North Sea to provide an example of improving safety performance trends.485 The HRC contains detailed voluntary information of over 4,000 hydrocarbon releases offshore from close to 300 installations since 1992. The HRC data, plotted in Figure 3, show the total number of releases to be on the decline. Classifying the severity of a release is based on agreed-upon criteria with the offshore industry.486 The UK has defined significant events to be those that, if ignited, have the potential to cause a major accident where multiple casualties could occur. The occurrence of any hydrocarbon release is undesirable because of the potential to escalate, and so reporting data from minor incidents has also been included in Figure 3 below.

Figure 3. Hydrocarbon releases in the North Sea reported to UK HSE as dangerous occurrences under the Reporting of Injuries, Diseases and Dangerous Occurrences Regulations.487 481 National Commission on the BP Deepwater Horizon Oil Spill. Deep Water: The Gulf Oil Disaster and the Future of Offshore Drilling. Report to the President; January 2011; Ch 8, p 225. 482 DNV is an independent foundation headquartered in Oslo, Norway, that provides services for managing risk around the world. For more information see http://www.dnv.com/ (accessed September 10, 2013). 483 DNV. Enhancing offshore safety and environmental performance: Key levers to further reduce the risk of major offshore accidents. 2013; p 5. http://www.dnv.com/industry/oil_gas/services_solutions/offshore_safety.asp (accessed September 10, 2013). 484 https://www.hse.gov.uk/hcr3/ (accessed January 13, 2014). 485 In its position paper, DNV cited data from 1996, but UK HSE has noted that the criteria for severity classification was refined in 1999 so data since that date is presented here. 486 Hydrocarbon Releases System Internet Help File, https://www.hse.gov.uk/hcr3/help/help_public.asp (accessed September 10, 2013). 487 RIDDOR – Reporting of Injuries, Diseases and Dangerous Occurrences Regulations 1995 became effective offshore on April 1, 1996, http://www.hse.gov.uk/riddor/ (accessed September 10, 2013). 0 50 100 150 200 250 Reported Releases Financial Year (April-March) 2000/01 to 2012/13 Minor Significant Major Total 116

Chevron Richmond Refinery Regulatory Report October 2014

It is important to note that major accidents are low-probability, high-consequence events, and as such they are difficult to measure. According to Dr. Andrew Hopkins, major accidents are more difficult to define than, say, a car accident, and they are rare, making it difficult to estimate the number of major accidents prevented.488 In addition, based on the data in existence, there is a continued need for improved data collection; key leading performance indicators development and implementation on a global scale would provide an improved glimpse into how safety is being managed for major accident prevention.

A team of three independent safety experts was asked to conduct an independent evaluation of the operational effectiveness of the National Offshore Petroleum Safety Authority (NOPSA), which was established in January 2005 to regulate offshore health and safety in Australia (it was superseded by NOPSEMA in January 2012). The 2008 report released as a result of the evaluation noted that the team of experts received submissions identifying issues surrounding the safety case regime from twelve stakeholders, including the Australian Workers Union, the Maritime Union of Australia, and the International Association of Drilling Contractors. The report states that a majority of the submissions expressed that the safety case regime had “generally been a success…” and “had led to improvements and already brought forth better consistency in many areas….”489 The report noted that there was general stakeholder agreement “that the regulatory processes have been improved.”490

As mentioned in Section 3.2.1.2 of the report, following the Macondo incident in April 2010, an independent review of the offshore safety case regime in the UK was conducted by a panel consisting of three independent appointees, including Professor Geoffrey Maitland at Imperial College London. A report was published discussing the review in December 2011, and it noted that, while not perfect, the offshore safety case regime was “robust and effective at identifying risks and appropriate measures for mitigation and response….”491 The report stated the following:

From its analysis of the existing UK framework and the information it gleaned from its discussion with those directly involved in the sector from both an operational and regulatory perspective, the Review Panel was reassured that the UK regime already incorporates a number of positive, key features which were not present in the US at the time of the Macondo incident. At a high level, the Panel notes and commends in particular:

• the UK’s “goal-setting” safety regime and its ability to foster innovation and continuous improvement in process integrity,

488 Hopkins, Andrew. The Cost-Benefit Hurdle for Safety Case Regulation: A discussion paper prepared for the US Chemical Safety Board. Add Date, Page, and Link. 489 Ognedal, Magne; Griffiths, Derek; and Lake, Bruce. Review of the National Offshore Petroleum Safety Authority Operational Activities. February-March 2008; p 14. 490 Ibid at 28. 491 Maitland, Geoffrey. Offshore Oil and Gas in the UK: an independent review of the regulatory regime. December 2011; p 4. https://www.gov.uk/government/uploads/system/uploads/attachment_data/file/48252/3875- offshore-oil-gas-uk-ind-rev.pdf (accessed January 13, 2014). 117

Chevron Richmond Refinery Regulatory Report October 2014

• the strength of the mechanisms in place for independent, third party verification in the crucial areas of well design and integrity of safety critical equipment,

• the rigour with which the potential environmental impacts of the industry are examined and of the controls and procedures in place to mitigate them,

• the detailed and comprehensive emergency response framework which exists for managing the consequences of incidents should they occur,

• the high regard in which the UK authorities, in the form of DECC, HSE and MCA, are held both by UK operators and international observers,

• the fact that the events in the Gulf of Mexico have clearly acted as a catalyst for UK operators, working in concert with the regulators and other stakeholders, to redouble their efforts to improve safety and to strengthen response capabilities.492

safety critical equipment, poor understanding of the potential impact of degrading plant and utility systems on safety critical elements, and lack of understanding of the role of asset integrity and the concept of barriers in major hazard risk control. Don’t these reports developed by the UK regulator demonstrate that the safety case is not effective and is not working? The CSB recognizes that there have been critiques of the safety case regime and its implementation. The CSB acknowledges that the safety case is not perfect and that no regulatory system will be perfect in its implementation. Some have noted the issue of aging equipment due to many issues, including the harsh conditions that exist in the North Sea. Regulators and commissions in the UK have found degradation of pipes, valves, and other equipment at many facilities due to company deferrals of maintenance, insufficient testing of safety-critical elements, and a continuing industry culture of responding to disasters, rather than anticipating worst-case scenarios. However, the safety case regime’s adaptive nature has been able to address these concerns. The HSE has recognized asset integrity management and the issue of ageing equipment as key issues to address in its inspection programs, and has developed internal processes and priorities for these areas. In 2010, the UK HSE initiated Key Programme 4 to address the issue of aging equipment offshore and the operation of installations beyond their design life.494 The same year, the HSE published a report intended 492 Ibid at 3. 493 The HSE published a report to communicate the results and conclusions of the Asset Integrity Key Programme carried out between 2004 and 2007 by the Health and Safety Executive’s Offshore Division. See http://www.hse.gov.uk/offshore/kp3.pdf (accessed August 28, 2013). 494 The report is available at http://www.hse.gov.uk/offshore/ageing/kp4-interim-report.pdf (accessed November 1, 2013). 118 Chevron Richmond Refinery Regulatory Report October 2014

to inform industry and aid in the prevention of major accidents entitled Managing Ageing Plant: A Summary Guide,495 which provides an overview of ageing plant mechanisms and their management and presents the findings of an analysis of loss of containment incidents to indicate the extent to which ageing plant equipment may be a factor. This type of programmatic proactive approach and information dissemination is lacking in the US both on and offshore.

when transitioning to a safety case approach? From the international safety case community, the CSB has found that when transitioning to a safety case regime there are many obstacles that may hinder the transition, such as:

• Major stakeholders not being committed to the process, unconvinced of the need; • Lack of understanding that the safety case regime is a “process” to be undertaken by the duty holder and the workforce to improve understanding of the hazards, risks, and their controls, and to put in place measures for continuous improvement, rather than just creation of a “document”; • Lack of sufficient funding by government and industry; and • Lack of the necessary legislative timetable.

The transition to a safety case regime has significant challenges for both the duty holder and the regulator, including:

• The safety case report could be treated as a check-the-box exercise; • Documented safety management system does not reflect reality; • Poor identification of hazards and risks; • Poor understanding of the performance of control systems; • Attempting to justify existing controls rather than to seek opportunity to improve; • Insufficient workforce involvement in the process; • The safety case process is under-resourced; • The safety case report is “inaccessible” so the report simply lives on the shelf; • The regulator does not use the safety case report to inform the inspection or audit; • Limited requirement for the reporting of accidents, dangerous occurrences and precursors resulting in lack of comprehensive performance data; and • The regulator is under-resourced, technically challenged, poorly trained, has poor systems and procedures, and is inconsistent.

In implementing the safety case regime, there should be regard for the regulatory principles and frameworks which represent best practice. The underlying principles are:

• The legislation and regulation should be fit for purpose, not simply superimposed on existing prescriptive regulation; 495 See http://www.hse.gov.uk/research/rrpdf/rr823-summary-guide.pdf (accessed November, 1, 2013). 119

Chevron Richmond Refinery Regulatory Report October 2014

• Regulation should be effective and efficient; and • Industry should move away from a culture of compliance with detailed prescriptive regulation to one of involving the workforce in understanding the hazards.

Some significant points worth noting from international experience in setting up the regulation are:

• Staff should be recruited against detailed job descriptions and should cover the full range of technical, management and regulatory requirements; • Pay rates and terms and conditions should be sufficient to attract highly qualified staff; • A competency framework needs to be developed reflecting the required knowledge, skills, and experience required to undertake; • Appropriate training programs must be in place; • An electronic dedicated safety case assessment procedure which captures the detail of the process to be followed and records the background to the decision-making process will be needed. This helps ensure good quality, consistent, and transparent assessment and provides a database of information which is used for future validation/topic facility inspections. It also provides a comprehensive record of the process which can be used in the event of an appeal against an assessment decision; • An accident and dangerous occurrence data base will be needed to store knowledge and data to provide reference information and the capacity to analyze trends; and • An emergency reporting and response process is necessary to ensure all significant events are properly logged and dealt with.

120

Chevron Richmond Refinery Regulatory Report October 2014

Appendix D: CSB Staff May 2014 Response to the Board’s Motion to Postpone issued on January 15, 2014 Background

On January 15, 2014, the CSB held a public meeting in Richmond, California, to present the draft Chevron Regulatory Report for a vote by the Board. In the first CSB Chevron Report (the Chevron Interim Report), which was approved by the Board on April 19, 2013, the CSB staff committed to investigating additional issues which would be presented in a final report on the incident. These issues included the regulatory oversight of petroleum refineries in California. Due to deployments to West, Texas, and Geismar, Louisiana, the CSB Chevron investigation team produced a second interim draft report focused solely on the regulation of petroleum refineries. At the Richmond public meeting, the Board moved to postpone a vote on the draft regulatory report in order for the CSB investigation staff to address additional issues raised concerning regulatory oversight of petroleum refineries and the proposed safety case regime. The CSB staff was given 120 days from the date of the public meeting to respond to the motion.

I.

Does Cal/OSHA have sufficient authority to require timely abatement of hazards associated with serious and willful violations? CSB Investigations Staff Response:

Following the August 6th incident at the Chevron Richmond Refinery, Cal/OSHA cited Chevron for, among other things, failing to replace pipe clamps at the refinery, and ordered Chevron to replace those pipe clamps by a certain date. The CSB Chevron Interim Report states that Chevron has a history of frequently using leak repair clamps to externally stop process fluid leaks, and that following discovery of the leak on the 4-sidecut piping prior to the incident, “Chevron hoped to forestall a shutdown by installing a leak repair clamp.”496 The CSB determined that Chevron had more than 100 clamps on hydrocarbon and other piping components containing hazardous flammable process fluids at the Richmond refinery and that reliance on such clamps to mitigate leaks “identifies serious questions about its mechanical integrity program.”497 The interim report, which was approved by the Board on April 19, 2013, committed to evaluating the Chevron Richmond Refinery’s use of clamps and its mechanical integrity program as they relate to the refinery’s process safety culture in the final CSB report on the Chevron incident.

A letter written by California Representative George Miller dated January 15, 2014 discussed Chevron’s use of clamps and expressed concern that some of the clamps have not been replaced, and will not be replaced until late 2014. The letter stated that under the California Labor Code, an employer is not obligated to correct a Cal/OSHA safety violation if they appeal. According to Representative Miller, 496 CSB. Chevron Interim Report. April 19, 2013; p 62. 497 Ibid. 121

Chevron Richmond Refinery Regulatory Report October 2014

Chevron appealed its Cal/OSHA citations on February 19, 2013. In the letter Rep. Miller requested that given these facts, the CSB investigators should assess the issue of timely abatement, and consider making recommendations to the Legislature and Governor on this matter.

The CSB staff notes that while it has already committed to evaluating the use of clamps at the Chevron Richmond Refinery as it relates to mechanical integrity and process safety culture, we are not aware of a causal connection between the refinery’s use of the clamps to mitigate leaks and the August 6th incident. Regulatory bodies often cite companies for deficiencies following an incident that are not related to that incident. However, the CSB is directed under the Clean Air Act to “investigate (or cause to be investigated), determine and report to the public in writing the facts, conditions, and circumstances and the cause or probable cause” of an accidental release.498 (emphasis added). The CSB’s Board Order 040, Procedure G: Causal Analysis, discusses requirements of formal analysis tools that identify the multiple causes of an incident, including technical, organizational, and societal causes. Thus, while the CSB staff committed to analyzing the issue of clamps at the refinery as it pertains to safety culture, the staff did not analyze the usage of clamps and abatement in its regulatory report, as it was not determined to be causal and was therefore not within the scope of the regulatory investigation.

Should Contra Costa County Health Services have direct enforcement authority under the Industrial Safety Ordinance? The CSB staff looked into this matter, including interviewing key personnel, and determined that while having enforcement power is generally beneficial, a CSB recommendation on the issue is not warranted in this case, as Contra Costa County’s lack of enforcement authority under the ISO is not causal to the August 6th incident. According to Contra Costa County officials, the inspectors have never gone to the District Attorney to enforce the ISO. In addition, these officials have stated to the CSB that the Chevron Richmond Refinery has cooperated fully with past recommendations and has addressed any violations issued as a result of any audit conducted by Contra Costa County inspectors. While the CSB agrees that having enforcement power provides the regulator with another tool to ensure compliance with regulations, there is no causal connection to the August 6th incident and therefore no additional recommendation regarding this issue is warranted.

Does Contra Costa County Health Services have sufficient resources to conduct comprehensive inspections and retain technically qualified personnel? The report discusses the lack of resources and funding within the Contra Costa Hazardous Materials Program, which has limited its ability to hire additional highly qualified staff to oversee the petroleum refineries in Contra Costa County. The engineers are part of a bargaining unit and their salaries are paid through the county’s general fund, which has experienced annual budget reductions in the millions. The CSB agrees that for a performance based regulatory approach to be effective it is essential to have a well funded, qualified regulator and has therefore added a recommendation to the City of Richmond and Contra Costa County. 498 42 U.S.C. §7412 (r)(6)(C)(i) (1990). 122

Chevron Richmond Refinery Regulatory Report October 2014

Does Contra Costa County Health Services have sufficient authority to require facilities to undertake feasible risk reduction measures, such as best practices, which go beyond minimum regulatory requirements? The draft report discusses on page 89 that Contra Costa engineers conduct CalArp and ISO/RISO audits concurrently at each covered facility generally once every three years. The engineers are only able to audit against the regulatory requirements, and while they can issue “consider” action items to the facility recommending actions above and beyond regulatory requirements, they do this very infrequently.

The Chevron Interim Report addressed ISO regulatory deficiencies, including the fact that there is no required implementation of inherent safety (unlike in the safety case). The Interim Report issues recommendations R3, R4 and R6 and R7, which request the City of Richmond and Contra Costa County to revise the ISO to require damage mechanism hazard reviews and the documented use of inherently safer systems analysis and the hierarchy of controls “to the greatest extent feasible” in establishing safeguards for identified process hazards. The recommendations note that the goal shall be to drive the risk of major accidents to As Low As Reasonably Practicable, or ALARP.

The ISO is currently being revised to implement these recommendations, and should be finalized as early as June 2014. The revised regulatory language would require facilities to reduce risk to “the greatest extent feasible,” which is a concept that is very similar to ALARP. Contra Costa County will have the ability to issue guidance that elaborates on what will be required to achieve that standard.

The CSB staff believes that these recommendations cover the issue raised in this question, and no additional recommendations are warranted.

II.

In the motion to postpone the Board made the following proposal to have additional questions addressed by an expert panel:

The CSB staff shall convene a multidisciplinary expert panel (selected by the full Board), similar to the Baker Panel established after the BP Texas City incident, to provide the agency with an assessment of the following topics regarding regulating process safety in refineries in California:

To address questions raised in the comments received by the CSB, the panel shall assess the available process safety performance data to evaluate the effectiveness of the safety case regulatory model for refineries.

Assess the challenges of making safety case operational and effective with regard to the following topics:

a. What is the role of transparency and community involvement under this regime? Are safety case reports made public? 123

Chevron Richmond Refinery Regulatory Report October 2014

b. How are workers empowered as part of the tripartite model? Have there been retaliatory actions taken against workers for their involvement, and what protective measures are in place? c. Are safety committees mandatory or optional in non-union workplaces? How are safety committee members selected, and under what authority? d. Is there a public data base of incident and near miss reporting? How are process safety performance indicators developed and used? Are these made public? e. How are standards for minimum levels of risk set (ALARP presumably goes beyond minimum levels)? f. What are the enforcement methods used by regulators under the safety case? g. What are the key transition issues that were addressed with facilities in operation at the time the safety case was adopted?

In response to this Board motion the staff has developed a white paper with staff responses to the questions posed by the Board. Additionally, the CSB is planning a public hearing in the Spring of 2015 to discuss various models, including safety case, for regulating high hazard facility safety.

124

Chevron Richmond Refinery Regulatory Report October 2014

[This page left intentionally blank.]

125

Chevron Richmond Refinery Regulatory Report October 2014

126

FD06453 | 2012_美国_Chevron Richmond 炼油厂 火灾 - Chevron Richmond Refinery Fire__最终报告_6.pdf

分类:06_境外及港澳台调查报告 | 年份:2012 | 地域: | 严重程度: | 场所:化工/石化 | 起火原因: | 来源格式:pdf

U.S. CHEMICAL SAFETY AND HAZARD INVESTIGATION BOARD

REGULATORY REPORT

REPORT NO. 2012-03-I-CA MAY 2014 CHEVRON RICHMOND REFINERY PIPE RUPTURE AND FIRE

CHEVRON RICHMOND REFINERY #4 CRUDE UNIT RICHMOND, CALIFORNIA AUGUST 6, 2012

Chevron Richmond Refinery Regulatory Report May 2014

2

Chevron Richmond Refinery Regulatory Report May 2014

3

Table of Contents Table of Contents .......................................................................................................................................... 3  Acronyms and Abbreviations ....................................................................................................................... 5  1.0  Executive Summary ......................................................................................................................... 7  1.1  Incident Summary ............................................................................................................................ 7  1.2  Interim Report .................................................................................................................................. 7  1.3  Background ...................................................................................................................................... 9  1.4  Key Findings .................................................................................................................................. 10  1.5  Regulatory Conclusions ................................................................................................................. 12  1.6  Recommendations .......................................................................................................................... 13  2.0  Introduction .................................................................................................................................... 14  3.0  The Safety Case Regulatory Regime ............................................................................................. 21  3.1  Introduction .................................................................................................................................... 21  3.2  Initial Safety Case Implementation ................................................................................................ 22  3.2.1  United Kingdom .................................................................................................................... 22  3.2.1.1  Onshore .......................................................................................................................... 22  3.2.1.2  Offshore ......................................................................................................................... 25  3.2.2  Global Analysis of Safety Case Implementation .................................................................. 27  3.2.2.1  Australia ........................................................................................................................ 27  3.2.2.1.1  Offshore ................................................................................................................. 27  3.2.2.1.2  Onshore .................................................................................................................. 28  3.2.2.2  Norway .......................................................................................................................... 29  3.2.2.3  The United States........................................................................................................... 30  3.2.2.3.1  OSHA PSM Standard ............................................................................................ 31  3.2.2.3.2  U.S. Environmental Protection Agency Risk Management Program .................... 33  3.2.2.3.3  Safety Case in the United States ............................................................................ 35  4.0  Key Features of an Effective Safety Case Regulatory Regime ...................................................... 37  4.1  Duty Holder Safety Responsibility, including a Written Case for Safety ...................................... 38  4.2  Continuous Risk Reduction to ALARP ......................................................................................... 40  4.3  Adaptability and Continuous Improvement ................................................................................... 44  4.4  Active Workforce Participation ..................................................................................................... 53  4.5  Process Safety Indicators that Drive Performance ......................................................................... 58 

Chevron Richmond Refinery Regulatory Report May 2014

4

  1. 6 

Regulatory Assessment, Verification, and Intervention ................................................................ 61  4.7  Independent, Competent, Well-Funded Regulator ........................................................................ 66  5.0  Oversight of Petroleum Refineries in California ........................................................................... 69  5.1  Cal/OSHA ...................................................................................................................................... 69  5.1.1  Background Information ....................................................................................................... 69  5.1.2  Analysis ................................................................................................................................. 75  5.1.2.1  ALARP .......................................................................................................................... 75  5.1.2.2  Adaptability and Continuous Improvement ................................................................... 77  5.1.2.3  Process Safety Indicators ............................................................................................... 79  5.1.2.4  Inspections ..................................................................................................................... 79  5.1.2.5  Workforce Participation ................................................................................................ 80  5.1.2.6  Funding and Regulator Competency ............................................................................. 82  5.2  U.S. Environmental Protection Agency ......................................................................................... 84  5.2.1  Risk Management Plan (RMP) Program ............................................................................... 84  5.2.2  Implementation of the RMP Program ................................................................................... 85  5.3  Unified Program ............................................................................................................................ 86  5.3.1.1  Contra Costa County Hazardous Materials Programs ................................................... 86  5.3.1.1.1  CalARP .................................................................................................................. 87  5.3.1.1.2  Industrial Safety Ordinance ................................................................................... 88  5.3.1.1.3  City of Richmond Industrial Safety Ordinance ..................................................... 89  5.3.1.2  Analysis ......................................................................................................................... 89  6.0  Conclusion ..................................................................................................................................... 91  7.0  Recommendations .......................................................................................................................... 92  References ................................................................................................................................................... 95  Appendix A: Significant Petroleum Refinery Incidents in 2012 ............................................................... 98  Appendix B: Regulatory Comparison Table ............................................................................................ 103  Appendix C: Frequently Asked Questions (FAQs) Regarding the Safety Case Regulatory Approach ... 106  Appendix D: CSB Staff Response to the Board’s Motion to Postpone issued on January 15, 2014 ....... 116 

Chevron Richmond Refinery Regulatory Report May 2014

5

Acronyms and Abbreviations ALARA

As Low As Reasonably Achievable ALARP

As Low As Reasonably Practicable ALJ

Administrative Law Judge ANPRM

Advance Notice of Proposed Rulemaking APA

Administrative Procedure Act API

American Petroleum Institute ASARP

As Safe As Reasonably Practicable BSEE

Bureau of Safety and Environmental Enforcement CA

Competent Authority CAA

Clean Air Act CAAA

Clean Air Act Amendments CalARP

California Accidental Release Prevention Cal/EPA

California Environmental Protection Agency Cal/OSHA

California Division of Occupational Safety and Health CAPA

California Administrative Procedure Act CCHMP

Contra Costa Health Services’ Hazardous Materials Program CCPS

Center for Chemical Process Safety CCR

California Code of Regulations CERCLA Comprehensive Environmental Response, Compensation, and Liability Act CFR

Code of Federal Regulations Chevron ETC Chevron Energy Technology Company CIMAH

Control of Industrial Major Accident Hazards COMAH

Control of Major Accidents Hazards Regulations CSB

U.S. Chemical Safety and Hazard Investigation Board CSHO

Compliance Safety and Health Officer CUPA

Certified Unified Program Agency DIR

California Department of Industrial Relations DNV

Det Norske Veritas EA

Environment Agency EPA

U.S. Environmental Protection Agency FSA

Formal Safety Assessment FY

Fiscal Year GAO

U.S. Government Accountability Office HSC

California Health and Safety Code HSE

Health and Safety Executive HTHA

High Temperature Hydrogen Attack ISO

Industrial Safety Ordinance

Chevron Richmond Refinery Regulatory Report May 2014

6

ISOM

Isomerization LOHP

Labor Occupational Health Program MOC

Management of Change MOOC

Management of Organizational Change NASA

National Aeronautics and Space Administration NDU

Naphtha Desulfurization Unit NEP

National Emphasis Program NOHSC

Australia National Occupational Health and Safety Commission NOPSEMA Australian National Offshore Petroleum Safety and Environmental Management Authority NPRM Notice of Proposed Rulemaking NRC U.S. Nuclear Regulatory Commission OERI Operational Excellence and Reliability Intelligence OIG Office of Inspector General OMB Office of Management and Budget OSHA

U.S. Occupational Safety and Health Administration OSHAct

Occupational Safety and Health Act PHA

Process Hazard Analysis PHMSA Department of Transportation, Pipeline and Hazardous Materials Safety Administration PQV Program Quality Verification PSA Petroleum Safety Authority PSI Process Safety Information PSLA Petroleum Submerged Lands Act PSLG Process Safety Leadership Group PSM Process Safety Management QRA Quantitative Risk Assessment RAGAGEP Recognized and Generally Accepted Good Engineering Practices RFI Request for Information RISC Risk-Informed Safety Case RISO City of Richmond Industrial Safety Ordinance RLOP Richmond Lube Oil Plant RMP Risk Management Plan RP Recommended Practice SEPA Scottish Environmental Protection Agency SFAIRP So Far As Is Reasonably Practicable SOP Standard Operating Procedure UK

United Kingdom USCG

U.S. Coast Guard USW

United Steelworkers Union

Chevron Richmond Refinery Regulatory Report May 2014

7

  1. 0 Executive Summary
  2. 1

Incident Summary On August 6, 2012, the Chevron U.S.A. Inc. Refinery in Richmond, California, (“the Chevron Richmond Refinery”) experienced a catastrophic pipe failure in the #4 Crude Unit (“the crude unit”). The pipe, a 52- inch long carbon steel piping component of the #4 sidecut line, ruptured and released flammable, hydrocarbon process fluid, which partially vaporized into a large vapor cloud that engulfed 19 Chevron employees and ignited. All of the employees escaped, narrowly avoiding serious injury. The ignition of the flammable portion of the vapor cloud and subsequent continued burning of the hydrocarbon process fluid resulted in a large plume of particulates and vapor traveling across the Richmond, California area. Approximately 15,000 people from the surrounding area sought medical treatment due to the release. 1.2 Interim Report The CSB released an Interim Report on the Chevron incident in April 2013 (“the Interim Report”), which highlighted technical findings and safety system deficiencies. Testing conducted on the ruptured pipe determined that it had experienced extreme thinning near the rupture location due to sulfidation corrosion.1 Sulfidation corrosion is a damage mechanism that causes thinning in iron-containing materials, such as steel, due to the reaction between sulfur compounds and iron at temperatures ranging from 450 °F to 800 °F.2 This damage mechanism3 causes pipe walls to gradually thin over time, and is common in crude oil distillation4 where naturally occurring sulfur and sulfur compounds found in crude oil feed, such as hydrogen sulfide,5 are available to react with steel piping and equipment. The Interim Report stated that virtually all crude oil feeds contain sulfur compounds and, as a result, sulfidation corrosion is a damage mechanism present at every refinery that processes crude oil. Sulfidation corrosion can cause thinning to the point of pipe failure when not properly monitored and controlled.

The Interim Report noted a number of causal safety system deficiencies that highlight regulatory gaps relating to major accident prevention at California petroleum refineries. For example, in conducting its process hazard analysis6 (PHA) of the crude unit, which was required under California’s Process Safety

1 With respect to the sulfidation corrosion damage mechanism that caused the Chevron incident, carbon steel piping corrodes at a rate that is significantly faster than other materials of construction, such as high chromium steels, including stainless steel. 2 For an electronic copy of the CSB Chevron Interim Report see http://www.csb.gov/assets/1/19/Chevron_Interim_Report_Final_2013-04-17.pdf (accessed October 24. 2013). 3 Piping damage mechanisms are any type of deterioration encountered in the refining and chemical process industry that can result in flaws/defects that can affect the integrity of piping (e.g. corrosion, cracking, erosion, dents, and other mechanical, physical or chemical impacts). See API 570. "Piping Inspection Code: In-Service Inspection, Rating, Repair, and Alteration of Piping Systems." 3rd ed., Section 3.1.1.5, November 2009. 4 Distillation separates mixtures into broad categories of its components by heating the mixture in a distillation column where different products boil off and are recovered at different temperatures. See http://www.eia.gov/todayinenergy/detail.cfm?id=6970 (accessed April 4, 2013). 5 Hydrogen sulfide is the most aggressive sulfur compound that causes sulfidation corrosion. 6 A process hazard analysis (PHA) is a hazard evaluation to identify, evaluate, and control the hazards of a process. Facilities that process a threshold quantity of hazardous materials, such as the Chevron Richmond refinery, are required to conduct a process hazard analysis per the California Code of Regulations Title 8 Section 5189, Process

Chevron Richmond Refinery Regulatory Report May 2014

8

Management (PSM) standard,7 Chevron did not conduct a rigorous review of corrosion and damage mechanisms present in the crude unit, and did not identify sulfidation corrosion as a hazard. As such, Chevron did not effectively address inherent safety8 or implement effective controls to prevent sulfidation corrosion, including those controls proposed by Chevron’s technical group. Although both the California and federal PSM standards require that hazards be identified, evaluated, and controlled, there is no further discussion of how far to reduce risks, and there is no requirement to address the effectiveness of controls or to use the hierarchy of controls.9 Therefore, this type of analysis was not required to be conducted, and Chevron was never cited post-incident for failing to evaluate the effectiveness of safeguards.

In another example, despite internal recommendations to replace the entire #4 sidecut piping with an inherently safer, more corrosion-resistant material of construction through the Management of Change (MOC) process, incident investigations, technical reports, and employee recommendations, Chevron repeatedly failed to implement those proposed recommendations. Chevron’s 2006 MOC analysis limited application of those recommendations to only a small section of the pipe. As a result, the portion of the pipe that failed on the August 6th incident remained in service until the incident. As there is no requirement to implement effective recommendations or control hazards under the MOC element, it is essentially an activity-based requirement. Chevron was not cited for narrowing the scope of the MOC, despite its disregard of internal recommendations. The CSB concluded in its Interim Report that Chevron did not regularly or rigorously apply inherently safer technology, which provides an opportunity for preventing major accidents, in its PHAs, MOCs, incident investigation recommendations, or during turnarounds.

The CSB made safety recommendations in the Interim Report to a number of entities, including the California State Legislature, the U.S. Environmental Protection Agency, and Contra Costa County. The Board recommended that the California State Legislature require California petroleum refineries to perform damage mechanism hazard reviews, to identify and report leading and lagging process safety indicators, to document recognized methodologies, rationale, and conclusions used to claim that safeguards intended to control hazards will be effective, and to document their inherently safer systems analysis and the hierarchy of controls in establishing safeguards for process hazards, with the goal of driving risk of major accidents to as low as reasonably practicable, or ALARP. These concepts, introduced in the Interim Report and highlighted in the recommendations, are the basic building blocks for the implementation of the safety case regime, a regulatory scheme that will be discussed in great detail in the following report.

The CSB concluded its Interim Report by highlighting additional issues that were still under investigation, including emergency planning and reporting, emergency response, safety culture, and regulatory oversight of petroleum refineries in California. The following report fulfills the CSB’s

Safety Management of Acutely Hazardous Materials (1992). PHAs are also required by the California Accidental Release Prevention Program and the federal EPA Risk Management Program. 7 Under 8 CCR §5189 (e). https://www.dir.ca.gov/title8/5189.html (accessed September 25, 2013). 8 According to the Center for Chemical Process Safety (CCPS), “inherently safer design solutions eliminate or mitigate the hazard by using materials nad process conditions that are less hazardous.” Center for Chemical Process Safety (CCPS). Inherently Safer Chemical Processs – A Life Cycle Approach. 2nd ed., Section 5.1.1, 2009. 9 An effectiveness ranking of techniques used to control hazards and the risk they represent can be described as a hierarchy of controls. The further up the hierarchy, the more effective the risk reduction achieved.

Chevron Richmond Refinery Regulatory Report May 2014

9

commitment to examine whether the implementation of the safety case regulatory regime could be a more effective regulatory tool to achieve major accident prevention for California petroleum refineries. The reader will find additional issues, arguments, and counterarguments regarding the safety case regulatory regime addressed in Appendix C of this report. 1.3 Background Although both the federal and California PSM standards, respectively, were intended to be goal-setting or performance-based,10,11 in practice they appear to function primarily as reactive and activity-based12 regulatory schemes that require extensive rulemaking to modify. As a result, the federal and California PSM standards have become static in the face of advancing best practices and technology, with the emphasis placed on the completion of a task or activity rather than achievement of continuous risk reduction.13 Many regions around the world such as the United Kingdom (UK), Australia, and Norway have acknowledged similar deficiencies and have implemented regulatory regimes consisting of both prescriptive14 and goal-setting elements that require duty holders15 to demonstrate to the regulator through rigorous reviews and audits that they have reduced risks to as low as reasonably practicable, or ALARP. This is referred to as the safety case regulatory regime.16 The safety case regulatory regime is a rigorous prescriptive and goal-setting regulatory approach applied globally both onshore and offshore. It is highlighted by its adaptability and requirements for continuous improvement in risk reduction for high hazard industrial facilities. A written case for safety, known as the safety case report, is generated by the duty holder and is generally rigorously reviewed, audited, and enforced by highly technically competent inspectors with skill sets familiar to those employed by the industries they oversee. Despite this global shift, the US has persisted in the use of a more activity-based regulatory scheme that lacks the ability to adapt to advancing technology and recently developed industry standards, and which has failed to adequately engage companies and their employees in continuous improvement and risk reduction with similarly-skilled inspectors.

10 Also referred to as performance-based regulations, goal-setting regulatory requirements and acceptance criteria are specified and industry must document that their specific solutions meet such requirements, e.g. in terms of acceptable risk levels. 11 See Preamble to Process Safety Management of Highly Hazardous Chemicals; Explosives and Blasting Agents. Section III. Summary and Explanation of the Final Rule (March 4, 1992). https://www.osha.gov/pls/oshaweb/owadisp.show_document?p_table=PREAMBLES&p_id=1041 (accessed August 13, 2013). 12 Activity-based standards and regulations require the mere completion of an activity and do not focus on the effectiveness of major accident prevention or risk reduction. 13 As will be discussed below, certain sections of the PSM standard have elements of a performance-based regulatory approach. 14 A prescriptive regulation or standard describes the specific means or activity-based actions to be taken for hazard abatement and compliance. Performance or goal-based regulations, on the other hand, state the objective to be obtained (such as risk reduction or hazard abatement) without describing the specific means of obtaining that objective. 15 Duty holders are considered to be “those who create and/or have the greatest control of the risks associated with a particular activity. Those who create the risks at the workplace are responsible for controlling them.” HSE. Planning to do business in the UK offshore oil and gas industry? What you should know about health and safety; October 2011; p 2. These entities may include operators, contractors, and subcontractors. http://www.hse.gov.uk/offshore/guidance/entrants.pdf (accessed June 5, 2013). 16 Norway’s offshore regulatory regime is not referred to as the safety case regime, but it does contain many of the same elements as the safety case regime, with some differences in style, substances, and implementation.

Chevron Richmond Refinery Regulatory Report May 2014

10

  1. 4

Key Findings Technical

In the ten years prior to the incident, highly knowledgeable and experienced Chevron technical staff repeatedly recommended that inspectors perform 100 percent component inspections on high temperature carbon steel piping susceptible to sulfidation corrosion. These recommendations were not implemented by Chevron management.17

Chevron technical staff recommended implementing inherently safer designs through the MOC process, incident investigations, technical reports, and past recommendations from employees. However, Chevron failed to implement proposed inherently safer recommendations prior to the incident. For example, an inspection recommendation to upgrade piping to 9-Chrome was made, but the MOC to implement the recommendation narrowed the scope, allowing the 52-inch component that failed to remain in service.

In January 2007, a failure due to sulfidation corrosion caused a fire in the Chevron Richmond Refinery crude unit, initiating a shelter-in-place for the surrounding community. A carbon steel piping spool18 failed catastrophically during operation. Chevron informed Contra Costa Health Services’ Hazardous Materials Program19 in a letter that the crude unit piping metallurgy had been upgraded following this incident as an inherently safer solution. However, this upgrade was limited to only the immediate piping spool that had failed. The inherently safer, more corrosion resistant metallurgy was not implemented more broadly in the crude unit as a result of this incident.

Chevron and Chevron Energy Technology Company metallurgists, materials engineers, and piping inspectors had expertise regarding sulfidation corrosion. However, they had limited practical influence to implement their recommendations. They did not participate in the most recent crude unit PHA, and they did not affect decisions concerning control of sulfidation corrosion during the crude unit turnaround process.20

The 2009 crude unit PHA did not identify corrosion as a potential cause of a leak or rupture in piping. The PHA cited non-specific, judgment-based qualitative safeguards to reduce risk, such as: utilizing metallurgy to minimize corrosion, having effective maintenance and inspection programs, and providing pipe wall corrosion allowances.21 The effectiveness of these safeguards was neither evaluated nor

17 These recommendations are discussed in detail in paragraphs 44 through 51 of the Chevron Interim Report. 18 A piping spool is a small, removable section of piping. In some cases, a piping spool is installed or removed in order to provide a temporary connection or complete disconnection between two piping circuits. 19 Contra Costa Health Services’ Hazardous Materials program is designed to respond to emergencies and monitor hazardous materials within Contra Costa County. See http://cchealth.org/hazmat/ (accessed April 17, 2013). 20 The turnaround process includes both the planning stage prior to the shutdown and the activities staged during the shutdown. 21 Corrosion allowance refers to extra wall thickness added as a safety factor to the design of a piece of equipment beyond that needed solely for mechanical considerations such as design temperature and pressure. This extra thickness is provided to accommodate for expected loss of wall thickness due to corrosion over the life of the equipment.

Chevron Richmond Refinery Regulatory Report May 2014

11

documented; instead the safeguards were merely listed in the PHA. Had the adequacy of these safeguards been verified, improved safeguards intended to protect against sulfidation-induced failure of carbon steel piping could have been recommended.

Regulatory

Following the August 6th incident, California’s Division of Occupational Safety and Health (Cal/OSHA) inspected the Chevron facility and issued citations. Only one citation was related to PHAs; and it was not associated with evaluating the effectiveness of safeguards. Rather, the emphasis was that Chevron’s PHA did not adequately account for hazards caused by other units associated with the crude unit. Had the California PSM standard required documentation of the effectiveness of safeguards, Chevron would have been obligated to conduct this analysis.

There is a significant discrepancy in the compensation between the California regulators and the Chevron Richmond Refinery personnel they interact with. The California regulators also lack the technical staff with the necessary skills, knowledge, and experience to provide sufficient direct oversight of petroleum refineries in California.

The CSB has examined records that demonstrate a considerable problem with significant and deadly incidents at petroleum refineries over the last decade. The EPA has noted 234 recordable accidents at petroleum refineries between 2000 and 2010. This is more than any other industry despite the fact that the nation’s petroleum refineries make up only roughly one percent of the some 13,000 facilities covered by the EPA’s Risk Management Program. In 2007, OSHA stated that according to its IMIS (Integrated Management Information System) database, since May 1992, 36 fatality/catastrophe (FAT/CAT) incidents related to HHC releases in the refining industry occurred. These incidents included 52 employee deaths and 250 employee injuries, 98 of these injuries required hospitalization. This number surpassed the combined total of the next three highest industries over the same period. In 2010, an OSHA official testified to a Congressional Subcommittee that over 20 major incidents resulting in injuries or fatalities across the country occurred between 2005 and 2010, including the Tesoro Anacortes explosion and fire in Washington. These incidents all repeated a lesson that should have already been learned by the industry. Finally, in 2012 alone, the CSB tracked 125 significant process safety incidents at US petroleum refineries. Seventeen of these took place in California.

Under the existing regulatory regimes for onshore petroleum refineries in the US and California, such as the PSM and RMP programs, there is no requirement to reduce risks to ALARP. For example, under both PSM and RMP an employer must “control” hazards when conducting a process hazard analysis (PHA) of a covered process. However, there is no requirement to address the effectiveness of the controls or the hierarchy of controls. Thus, a PHA that meets the regulatory requirements may inadequately identify or mitigate major hazard risk. In addition, there is no requirement to submit PHAs to the regulator, and the regulator is not responsible for assessing the quality of the PHA or the proposed safeguards.

Chevron Richmond Refinery Regulatory Report May 2014

12

The PSM standard does not effectively establish goals to prevent accidents or reduce risk. Only two of the 14 elements (PHA and mechanical integrity) of the PSM standard contain some goal-setting component.

In the last decade, the CSB has made a number of process-safety related recommendations to OSHA and EPA in its investigation reports and studies (e.g. Motiva, BP Texas City, and Reactive Hazards). However, none of the regulatory recommendations have been implemented, and there have been no substantive changes made to the PSM and RMP regulations to improve the prevention of major accidents.

Available data from Norway and the United Kingdom (UK) shows a reduction in hydrocarbon releases offshore under the safety case regulatory regime.22

Regulatory approaches similar to the safety case regulatory regime, which require risk reduction to ALARP or equivalent, have been implemented in the nuclear sector by the Nuclear Regulatory Commission (NRC) and the aerospace sector by NASA.

Independent studies of the safety case regulatory regime in the UK have identified improvements to safety performance from the safety case and a variety of stakeholders, including major oil companies, have shown support of the safety case.23

  1. 5

Regulatory Conclusions The existing regulatory regimes for onshore petroleum refineries in the US and California:

Rely on a safety and environmental management system framework that is primarily activity-based rather than requiring goal-based risk reduction to as low as reasonably practicable (ALARP) or equivalent.

Are static, unable to adapt to innovation and advances in the management of major hazard risks.

Do not require that companies effectively manage the risks they create; nor do they require regulator evaluation of the effectiveness of safeguards or regulator acceptance of companies’ plans for controlling those risks.

Do not ensure continuous improvement by effectively incorporating lessons learned from major accidents; nor do they require companies to address newly-identified safety issues as a result of such incidents.

Do not effectively collect or promote industry use of major accident performance indicators to drive industry to reduce risks to ALARP.

22 Norway’s indicator data is discussed in Section 4.5. The UK data is discussed in Appendix C. 23 See Sections 2.0, 3.2.1.2, and 3.2.2.3. Also see FAQ 4.

Chevron Richmond Refinery Regulatory Report May 2014

13

Do not require the use or implementation of inherently safer systems analysis or hierarchy of controls.

Do not effectively involve the workforce in risk reduction and prevention of major accidents.

Do not provide the regulator with the authority to accept or reject a company’s hazard analysis, risk assessment, or proposed safeguards; and

Do not employ the requisite number of staff with the technical skills, knowledge, and experience to provide sufficient direct safety oversight of petroleum refineries.

  1. 6

Recommendations As a result of the findings and conclusions of this report, the CSB makes recommendations, summarized below, to the following recipients:

California State Legislature, Governor of California

Develop and implement a step-by-step plan to establish a more rigorous safety management regulatory framework for petroleum refineries in the state of California based on the principles of the “safety case” framework.

The Chemical Facility Safety and Security Working Group and the Occupational Safety and Health Administration

As part of your response to Executive Order 13650, develop questions and evaluate issues raised from the findings and conclusions in this report concerning the safety case regime.

Section 7.0 details the recommendations.

Chevron Richmond Refinery Regulatory Report May 2014

14

  1. 0 Introduction

Despite the fact that the nation’s roughly 150 petroleum refineries represent only a small fraction of the thousands of industrial and chemical facilities that exist in the US, the CSB has seen a great number of serious and deadly incidents at refineries over the last decade.

In March 2005, the BP Texas City Refinery suffered one of the worst industrial accidents in recent US history, when overfill of a distillation column resulted in an explosion and fire that led to 15 fatalities, another 180 injuries, and the issuance of a shelter-in-place order that required 43,000 people to remain indoors. Houses were damaged as far as three-quarters of a mile away from the refinery. In a 2006 statement, former CSB Chairwoman Carolyn Merritt said that while BP did make some safety improvements before the March 2005 explosion, “the focus of many of these initiatives was on improving procedural compliance and reducing occupational injury rates, while catastrophic safety risks remained….”24

In November 2009, an explosion at the Silver Eagle Refinery damaged over 100 homes in a nearby subdivision in Woods Cross, Utah. At a public meeting to discuss the incident, former CSB Chairman John Bresland called on refineries to improve their safety performance, stating:

The frequency of accidents in US refineries is very troubling. These accidents cost lives, inflict serious injuries and can harm communities. They also earn scrutiny from government regulators; in the past few weeks a refinery in Texas drew the largest OSHA fine in history, more than US $80 million, for alleged process safety violations. I call on all refineries to redouble their commitment to safer operations and safer communities. The current rate of accidents in refineries is not sustainable and it is not acceptable.25 On the five-year anniversary of the BP Texas City explosion in March 2010, Chairman Bresland continued to relay his concern regarding refinery safety, noting that “refinery accidents…continue to occur with dismaying frequency…[and] will only stop when every refinery has made the financial and human commitment to sound process safety management.”26 Yet just ten days later, seven workers were fatally injured at the Tesoro refinery in Anacortes, Washington, following the catastrophic failure of a heat exchanger. Again, Chairman Bresland pointed out the alarming frequency of refinery incidents, stating that “if the aviation industry had the same number and types of incidents as the refining industry, I don’t think people would be flying too much.”27

24 Scrutiny Finds BP Safety Troubles. http://usatoday30.usatoday.com/money/industries/energy/2006-10-30-bp- blast-findings_x.htm (accessed September 5, 2013). 25US Refineries Commitment to Safety Called Into Question. http://www.engineerlive.com/content/22354 (accessed September 5, 2013). 26 http://www.csb.gov/statement-from-csb-chairman-john-bresland-on-5th-anniversary-of-fatal-bp-texas-city-2005- explosion/?pg=18 (accessed September 5, 2013). 27Refinery Tragedies All Too Common. See http://seattletimes.com/html/localnews/2011518449_safetysunday04m.html (accessed September 5, 2013)

Chevron Richmond Refinery Regulatory Report May 2014

15

On June 10, 2010, OSHA Deputy Assistant Secretary Jordan Barab testified before the Senate Committee on Health, Education, Labor and Pensions’ Subcommittee on Employment and Workplace Safety regarding worker safety in US energy production industries. Mr. Barab noted that OSHA had counted over 20 major incidents resulting in injuries or fatalities across the country that had occurred within the last five years, including the Tesoro Anacortes explosion and fire in Washington. These incidents all repeated a lesson that should have already been learned by the industry.28 According to Mr. Barab, “[t]his cycle of workers being hurt or killed because their employers failed to implement well-known safety measures points out major deficiencies in chemical process safety management in the nation’s refineries and, quite possibly, to systemic safety and health problems in the entire petrochemical industry.”29 According to OSHA’s compliance instruction document CPL-03-00-00430 on the OSHA Petroleum Process Safety Management National Emphasis Program (NEP) issued in 2007, Since the PSM standard was promulgated by OSHA in 1992, no other industry sector has had as many fatal or catastrophic incidents related to the release of HHC [highly hazardous chemicals] as the petroleum refining industry []. According to OSHA's IMIS [Integrated Management Information System] database, since May 1992, 36 fatality/catastrophe (FAT/CAT) incidents related to HHC releases in the refining industry have occurred. These incidents included 52 employee deaths and 250 employee injuries, 98 of these injuries required hospitalization. The number of refinery FAT/CAT incidents surpasses the combined total of the next three highest industries over the same period (SIC 2899 Chemical Manufacturing, Not Elsewhere Classified (NEC) – 12 FAT/CATs; SIC 2869 Industrial Organic Chemical Manufacturing, NEC – 12 FAT/CATs; and SIC 2892 Explosive Manufacturing – 11 FAT/CATs).31 In 2012 alone, the CSB tracked 125 significant32 process safety incidents at US petroleum refineries, which are listed in Appendix A. Seventeen of these took place in California, including a major release of 8,614 pounds of highly toxic hydrogen sulfide at the Chevron Richmond Refinery on August 2, 2012, just four days prior to the incident. Of the 15 major accidents that the CSB is currently investigating, six occurred in petroleum refineries. These include two separate explosions at the Silver Eagle refinery in Woods Cross, Utah, which resulted in injuries and offsite consequences, the heat exchanger rupture at the Tesoro refinery in Anacortes, Washington, which resulted in seven fatalities, and a series of equipment failures at CITGO’s refinery in

28 Jordan Barab’s Congressional testimony is available at http://www.dol.gov/ocia/congressionaltestimony/20100610_JBarab.htm (accessed January 7, 2014). 29 Ibid. 30 OSHA Instruction CPL 03-00-004. Petroleum Refinery Process Safety Management National Emphasis Program. June 7, 2007. https://www.osha.gov/pls/oshaweb/owadisp.show_document?p_table=DIRECTIVES&p_id=3589#VIII (accessed January 7, 2014). 31 Ibid at Section VIII. 32 These incidents were reported to the Department of Energy and/or the National Response Center and examined by the CSB’s Incident Screening Department. The CSB believes that incidents that result in disruptions to the national energy supply, serious injuries, or receive high media attention are all significant.

Chevron Richmond Refinery Regulatory Report May 2014

16

Corpus Christi, Texas, involving highly toxic hydrogen fluoride. The U.S. Environmental Protection Agency (EPA) has also documented 234 recordable accidents at petroleum refineries between 2000 and

  1. Despite the fact that the nation’s petroleum refineries make up only roughly one percent of the

some 13,000 facilities covered by the EPA’s Risk Management Program, they accounted for more incidents in that time period than any other industry, including the much larger sector of chemical manufacturing, which EPA documented as having 218 recordable accidents.33

The CSB concludes that the continuing occurrence of refinery accidents demonstrates the pressing need to examine the current regulatory structure in place in the US and, in light of the Chevron incident, in the state of California for petroleum refineries. There have been a number of positive developments in the wake of the Chevron incident that demonstrate California’s prime opportunity to lead the nation in implementing changes to improve safety and health in the refining industry. In the Fall of 2012 following the Chevron incident, California Governor Jerry Brown created the California Interagency Working Group on Refinery Safety (“the working group”), charged with improving cooperation among agencies, including the EPA, Cal EPA, California’s Division of Occupational Safety and Health (Cal/OSHA), and Contra Costa County, with the goal of improving safety at California’s petroleum refineries and preventing major accidents.

The working group began its initiative by commissioning the Labor Occupational Health Program34 (LOHP) to conduct “listening panels” throughout California, enabling community members to meet with working group members to discuss their concerns surrounding refineries. LOHP convened a series of meetings and conference calls with labor unions, community-based organizations, fire agencies, and environmental health groups between November 6, 2012, and March 18, 2013. Dr. Michael P. Wilson, the former Director of LOHP,35 documented his findings and recommendations regarding refinery safety in a summary report entitled Refinery Safety in California: Labor, Community and Fire Agency Views, which was released on June 4, 2013.36 In the report, Dr. Wilson quoted Swiss Re’s finding that the US has experienced financial losses from refinery incidents that are three times that of industry counterparts in countries within the “EU cluster,”37 a gap which continues to grow due in part to the US refining industry’s “pushing…mode of operation”, its “compliance-driven focus on safety”, and “a ‘detached’ workforce….”38

33 Matthiessen, Craig. EPA Risk Management Program: An Overview of the EPA Risk Management Program and Inherently Safer Processes. NAS-MIC Bayer Public Meeting Power Point Presentation; May 24, 2011; p 20. 34 LOHP is a public service program for the Center for Occupational and Environmental Health at UC Berkeley’s School of Public Health. LOHP seeks “to reduce occupational injury, illness and death by protecting the health and safety of workers worldwide.” For more information, see http://www.lohp.org/ (accessed July 8, 2013). 35 Dr. Wilson now serves as Chief Scientist in the Office of the Director, California Department of Industrial Relations (DIR). DIR oversees state programs dedicated to protecting the health, safety, and economic security of California’s workers. 36 Dr. Wilson released an initial draft of the summary report on March 27, 2013. He then released a revised copy of the summary report on June 4, 2013. See http://www.lohp.org/projects/refinery_safety.html (accessed July 8, 2013). 37 The countries in the EU cluster are all of Europe, Singapore, South Korea, Japan, Saudi Arabia, Gulf States and Egypt. 38 Wilson, Michael P. Refinery Safety in California: Labor, Community and Fire Agency Views; Summary Report for Office of Governor Jerry Brown, Interagency Task Force on Refinery Safety; March 27, 2013, Revised June 4, 2013; pp 5 and 6. Citing Zirngast, Ernst. (June 6, 2006). Selective U/W in Oil-Petro Segment: Loss Burden in Different Regions, USA vs. Rest of the World, History of Selective U/W, Cause of Losses. Technical report-DRAFT-

Chevron Richmond Refinery Regulatory Report May 2014

17

Dr. Wilson reiterated a number of the findings contained in the CSB’s Interim Report on the Chevron incident, including the “striking lack of attention on the part of the Richmond Chevron refinery to maintenance and metallurgy upgrades…,” and the Chevron Richmond Refinery’s failure to implement a recommended 100% component inspection program for high-risk piping. He also stated that California’s refineries are able to operate without demonstrating competence in health, safety, and environmental performance to a regulatory agency or to the public, and as such recommended that California establish a regulatory approach similar to that of the safety case regulatory regime, a rigorous prescriptive39 and goal- setting40 regulatory regime used widely by other regions throughout the world such as the United Kingdom (UK) and Australia to regulate high hazard industrial facilities. It is highlighted by its adaptability and requirements for continuous improvements in risk reduction, places the duty on industry to demonstrate its competence in health and safety to the regulator. The regime is overseen by highly competent, well-funded regulators that rigorously audit facilities for compliance with the written safety case report and good industry practice.

On July 11, 2013, the working group released a draft report entitled Improving Public and Worker Safety at Oil Refineries,41 which the CSB has recognized as an important step forward in improving petroleum refinery safety and environmental performance both in California and nationally. The report outlined the process of adopting several of the CSB‘s recommendations from its Interim Report on the Chevron incident, including requiring refineries to implement inherently safer systems and conduct damage mechanism hazard reviews. Furthermore, the report announced the creation of an Interagency Refinery Task Force within the California Environmental Protection Agency (Cal/EPA) by September 1, 2013, aimed at facilitating information sharing and improving coordination of oversight and enforcement activities among regulatory agencies. The CSB welcomed the report’s recommendation for California to study the safety case regulatory approach.

In addition to the work being done by the working group, the California State Legislature approved a 2013-2014 state budget bill (AP 110) that allows the California Department of Industrial Relations to charge state petroleum refineries a “fee” by March 31, 2014, to help pay for at least 15 new positions in Cal/OSHA’s Process Safety Unit, which enforces the California Process Safety Management (PSM) standard throughout the state.42

The Chevron incident also spurred the formation of the City of Richmond’s Refinery Action Collaborative (“the collaborative”), which was launched on January 30, 2013. The collaborative, whose

EXTRACT. Risk Engineering Services, Swiss Re. http://coeh.berkeley.edu/people/apers_educ/docs/LOHPRefinery%20Safety.pdf (accessed December 30, 2013). 39 A prescriptive regulation or standard describes the specific means or activity-based actions to be taken for hazard abatement and compliance. Performance or goal-based regulations, on the other hand, state the objective to be obtained (such as risk reduction or hazard abatement) without describing the specific means of obtaining that objective. 40 Also referred to as performance-based regulations, goal-setting regulatory requirements and acceptance criteria are specified and industry must document that their specific solutions meet such requirements, e.g. in terms of acceptable risk levels. 41 See http://www.calepa.ca.gov/Publications/Reports/2013/Refineries.PDF (accessed September 25, 2013). 42 See http://www.caltax.org/homepage/062113_Legislature_Approves.html (accessed July 9, 2013).

Chevron Richmond Refinery Regulatory Report May 2014

18

members include the United Steelworkers43 (USW) Local 5, the USW International, Communities for a Better Environment,44 and LOHP,45 was launched after a preliminary exploratory meeting held in October

  1. The collaborative advocates for community and worker safety, better transparency, and

environmental health, and has already made recommendations to the working group to improve emissions reporting and require more thorough assessments of pipe corrosion damage at oil refineries.46

On October 10, 2013, the collaborative formally responded in a memo to the July 2013 draft report issued by the Interagency Working Group on Refinery Safety (Improving Public and Worker Safety at Oil Refineries). In the memo, the collaborative stated its support for the working group’s findings and recommendations. The collaborative also issued its own recommendations and highlighted 12 principles as being important to the development of effective regulatory policy in California. These principles include linking regulatory non-compliance to an operator’s license to operate and integrating meaningful participation in decision-making by workers and communities.47 The collaborative also noted in the memo that it supported “shifting the ‘burden of proof’ of safety from public agencies to the industry, as is required in the ‘Safety Case’ approach….”48

The CSB noted in its Chevron Interim Report the important role of transparency between industry and the public in improving health and safety for the facility and the surrounding communities. Following the Chevron incident the collaborative, worker representatives, regulators, and governmental bodies played a key role in driving transparency, accountability, and improved risk reduction during the decision-making process related to crude unit piping repairs. The CSB recommended to the California State Legislature in the Interim Report to establish a multi-agency process safety regulatory program for all California petroleum refineries to further improve public accountability and transparency by establishing a system to report to the regulator methodologies, findings, conclusions, and corrective actions related to refinery mechanical integrity inspection and repair work arising from California petroleum refinery PHAs, turnarounds, and maintenance-related shutdowns.49 This system would require reporting of information such as damage mechanism hazard reviews, establish procedures for greater workforce and public participation, and provide mechanisms for federal, state, and local agency operational coordination,

43 The USW is the largest industrial union in North America and has approximately 1.2 million active and retired members in the US, Canada, and the Caribbean. For more information see http://www.usw.org/ (accessed July 17, 2013). 44 Communities for a Better Environment is an “environmental justice organization[s]” in California which has the mission of “build[ing] people’s power in California’s communities of color and low income communities to achieve environmental health and justice by preventing and reducing pollution and building green, health and sustainable communities and environments.” See http://www.cbecal.org/about/mission-vision/ (accessed August 14, 2013). 45 Other members of the collaborative include the BlueGreen Alliance (a coalition of labor unions and environmental groups that advocate for a green economy and safer workplaces), the National Resources Defense Council, and the Asian Pacific Environmental Network. 46 See http://richmondconfidential.org/2013/02/20/labor-and-environmental-groups-join-forces-on-refinery-issues/ (accessed July 9, 2013). 47 Refinery Action Collaborative. Initial Response of the Collaborative to the Findings & Recommendations of The July 2013 Draft Report of the Interagency Working Group on Refinery Safety, Governor Jerry Brown. October 10, 2013; p 10. 48 Ibid at 7. 49 Under the existing federal and California state PSM standards, this information is not currently made publicly available.

Chevron Richmond Refinery Regulatory Report May 2014

19

sharing of data, and joint accident prevention activities. California is actively working to implement this recommendation through the creation of the Interagency Refinery Task Force mentioned above.

The positive and productive developments that have taken place in the wake of the Chevron incident strongly suggest that California has a unique opportunity to implement changes to improve safety and health in the refining industry that can serve as a model to the rest of the country.

It is also important to note that a growing dialogue has emerged throughout the US surrounding the need to improve the regulation of hazardous materials and processes, to which the CSB has been an important contributor. The CSB first examined the safety case in its 2002 investigation report entitled Improving Reactive Hazard Management50 as a potentially effective alternative framework for the regulation of reactive hazards. The CSB noted that successful implementation of this “comprehensive” regulatory approach required a competent and experienced regulator. In December 2010, the CSB held a public hearing in Washington, DC on the Regulatory Approaches to Offshore Oil and Gas Safety, where internationally recognized experts in industrial safety and accident analysis provided important testimony on managing risks offshore.51 Much of this testimony supported the implementation of the safety case as a model for regulating major hazards, both onshore and off. For example, a Shell Oil Company representative testified that the company had been using the safety case globally since 2002, and noted that the most valuable aspect of that type of regulatory regime was the need to demonstrate that major hazards have been managed using effective barriers52 and controls. In July 2012, the CSB held an additional public hearing on Safety Performance Indicators.53 A number of international regulators testified on the regulator’s ability under the safety case to drive continuous improvement in the oil and gas industry. Finally, on July 25, 2013, the CSB held a public meeting to discuss the U.S. Occupational Safety and Health Administration’s (OSHA’s) failure to implement a number of key CSB safety recommendations made to OSHA in the last decade to revise and improve its Process Safety Management (PSM) standard and to issue a new combustible dust standard.

On January 18, 2011, President Obama issued Executive Order 13563,54 which called for improvements in the nation’s regulatory system to promote predictability and reduce uncertainty and to use the best, most innovative, and least burdensome tools for achieving regulatory ends. Specifically, it directed that agencies review existing and proposed standards and regulations to ensure they effectively protect “public health, welfare, safety, and our environment while promoting economic growth, innovation, competitiveness, and job creation.”55 Finally, the order emphasized that to the extent feasible, regulations

50 A full copy of the report is available at http://www.csb.gov/improving-reactive-hazard-management/ (accessed July 10, 2013). 51 For a copy of the transcript from the CSB Public Hearing on the Regulatory Approaches to Offshore Oil and Gas Safety, see http://www.csb.gov/assets/1/19/Transcript_of_Public_Meeting_12_15_2010.pdf (accessed August 14, 2013). 52 A barrier is a “technical, operational and/or organizational element[] which individually or collectively reduce[s] opportunities for specific error, hazard or accident to occur, or which limits its harm/drawbacks.” Petroleum Safety Authority. Safety Status & Signals, 2012-2012; 2013; p 31. 53 For the proceedings of the CSB Public Hearing on Safety Performance Indicators see http://www.csb.gov/events/csb-public-hearing-safety-performance-indicators/ (accessed August 14, 2013). 54 Improving Regulation and Regulatory Review. Exec. Order No. 13563, 76 Fed. Reg. 14 (January 21, 2011). http://www.archives.gov/federal-register/executive-orders/2011.html (accessed July 10, 2013). 55 Ibid.

Chevron Richmond Refinery Regulatory Report May 2014

20

and standards should specify performance objectives rather than the behavior or manner of compliance that regulated entities must adopt, and be adopted through a process that involves public participation. As a result of this Executive Order, OSHA, the Bureau of Safety and Environmental Enforcement (BSEE), the EPA, the Department of Transportation’s Pipeline and Hazardous Materials Safety Administration (PHMSA), and the U.S. Coast Guard (USCG) solicited views from the public and stakeholders regarding opportunities to address improving efficiency and effectiveness of safety and environmental regulations and standards in the oil and gas industry.56 These five agencies then convened an expert forum57 in September 2012 in Texas City, Texas, to explore the benefits of implementing goal or performance-based regulatory models such as the safety case in the oil and gas industry, and ways to advance the use of such models in the US. The forum included a discussion of the safety case regulatory regime as a performance-based regulatory model, and industrial safety and accident analysis expert Dr. Andrew Hopkins spoke in support of that model.

In the wake of the April 2013 explosion and fire that occurred at a fertilizer storage and distribution facility in West, Texas, and resulted in fifteen fatalities and hundreds of injuries, President Obama issued Executive Order 1365058 on August 1, 2013. The Executive Order established the Chemical Facility Safety and Security Working Group, a working group of federal agencies59 tasked with, among other things, developing options for enhancing and modernizing policies, regulations, and standards to improve the safety and security of chemical facilities.60 As will be discussed in Section 4.3, the group has included the safety case regulatory model in a list of potential actions it may consider taking to improve chemical safety regulation.61

The CSB has utilized a broad range of expert testimony and research to gain a comprehensive understanding of regulatory models for onshore and offshore oil and gas facilities in countries around the world, and, in light of this investigation, the state of California. This report highlights the significant attributes of the safety case regime that together result in a more effective regulatory approach to process safety and risk reduction. It also provides a detailed contrast of the safety case regulatory model to the existing regulatory structures in the US and California, and makes recommendations to improve California’s regulatory oversight of its petroleum refineries and to promote a broader national dialogue on the safety case regulatory approach.

56 For more information see https://www.osha.gov/pls/oshaweb/owadisp.show_document?p_table=FEDERAL_REGISTER&p_id=23267 (accessed July 10, 2013). 57 See https://www.osha.gov/pls/oshaweb/owadisp.show_document?p_table=FEDERAL_REGISTER&p_id=23267 (accessed August 13, 2013). 58 Improving Chemical Facility Safety and Security. Exec. Order No. 13650, 78 Fed. Reg. 48029 (August 1, 2013). https://www.federalregister.gov/articles/2013/08/07/2013-19220/improving-chemical-facility-safety-and-security (accessed January 7, 2014). 59 The working group includes the EPA, the Department of Justice, the Department of Agriculture, the Department of Transportation, and the Department of Labor. 60 See Section 6 of the Executive Order. 61 See Working Group response to Executive Order 13650, Section 6(a) – Solicitation of Public Input on Options for Policy, Regulation, and Standards Modernization. https://www.osha.gov/chemicalexecutiveorder/Section_6ai_Options_List.html (accessed January 7, 2014).

Chevron Richmond Refinery Regulatory Report May 2014

21

  1. 0 The Safety Case Regulatory Regime
  2. 1

Introduction Throughout modern history, major industrial accidents have been catalysts for significant regulatory reform, as countries around the world strive to mitigate risk and improve the safety of their facilities and processes in order to protect human health and the environment. According to industrial safety and accident analysis expert Dr. Andrew Hopkins, “[d]isasters…offer an unparalleled opportunity to study the workings of an organisation and to identify where things are going wrong.”62 Around the world, many of these large-scale incidents have resulted in sweeping changes to legislation surrounding industrial safety and health. These changes replace prescriptive, compliance-based regulations with goal-setting regulations supplemented by prescriptive requirements that support adaptability, require duty holders63 to demonstrate to the regulator that they have driven risks to as low as reasonably practicable (ALARP) or equivalent, and provide the regulator with the tools to drive continuous improvement among major hazard facilities.64 A majority of these regulatory regimes are referred to as the safety case, which Dr. Hopkins defines as: a case which the operator of a hazardous facility makes to the regulator, setting out how safety is to be managed. It must include details of the hazard identification process, the hazards which have been identified and the procedures which have been set in place to control them. The system remains self-regulatory in principle but rather than the facility being left to its own devices by the regulator it must convince the regulator that its strategy for managing safety is satisfactory [emphasis added]. Under any safety case regime, facility operators are expected to adopt best practice risk management.65 The safety case regulatory regime is much more than a written report; it shifts risk management responsibility to the company and its employees and provides for rigorous review and oversight by a technically competent regulator to ensure effective implementation.66

62 Hopkins, Andrew. Managing Major Hazards: The Lessons of the Moura Mine Disaster; National Library of Australia, 1999; p 1. 63 Duty holders are considered to be “those who create and/or have the greatest control of the risks associated with a particular activity. Those who create the risks at the workplace are responsible for controlling them.” HSE. Planning to do business in the UK offshore oil and gas industry? What you should know about health and safety; October 2011; p 2. These entities may include operators, contractors, and subcontractors. http://www.hse.gov.uk/offshore/guidance/entrants.pdf (accessed June 5, 2013). 64 Major hazard facilities are workplaces that store, handle or process large quantities of hazardous material. Incidents at such facilities have the potential to cause serious damage to employees, people in surrounding areas, and the environment. See http://www.pc.gov.au/__data/assets/pdf_file/0018/82350/21-appendixd.pdf (accessed May 9, 2013). 65 Hopkins, Andrew. Lessons from Esso’s Gas Plant Explosion at Longford; Australian National University [Online]; p 7. http://www.sirfrt.com.au/Meetings/IMRt/Southeast/IMRt%20East%2000Nov30/Andrew%20Hopkins%20presentati on/Lonford%20talk.PDF (accessed May 8, 2013). 66 The CSB notes that that the burden is currently on the PSM regulator to verify compliance with existing regulations, which is primarily done following an incident or complaint. Rarely is this done proactively under the

Chevron Richmond Refinery Regulatory Report May 2014

22

The remaining portions of Section 3 will introduce major accidents that have occurred around the world and discuss the history behind the global development and implementation of the safety case regulatory approach on and offshore. Section 4.0 will then highlight major attributes of the safety case regulatory approach. The US regulatory model will also be introduced and discussed throughout these sections to allow for comparisons between the different approaches. Finally, Section 5.0 will discuss the regulation of petroleum refineries in California specifically, including Chevron. The report concludes with important recommendations focused on improving the regulatory oversight of California’s 14 refineries, and encouraging OSHA, industry, labor, and others to work together to improve the regulation of petroleum refineries throughout the US. 3.2 Initial Safety Case Implementation 3.2.1 United Kingdom 3.2.1.1 Onshore Two major onshore incidents in the 1970s helped spark legislative reform focused on major accident prevention and risk reduction for onshore major hazard facilities. A large dioxin67 release in Seveso, Italy, in 1976, which injured hundreds of individuals, led the European Commission68 to adopt legislation in 1982 known as the Seveso Directive, aimed at the prevention and control of major industrial accidents.69 Following the 1984 toxic release in Bhopal, India, which resulted in several thousand known fatalities, and the Sandoz chemical plant fire near Basel, Switzerland, which injured 14 individuals and released nearly 30 tons of pesticides into the Rhine River, turning it red, the Seveso Directive was amended and replaced in 1996 with the Seveso II Directive.70 The regulation requires owners or operators of facilities that contain threshold quantities of listed substances to submit safety reports to a competent authority (CA) within a Member State of the European Commission for its review and acceptance.71 These reports must demonstrate to the CA that major-accident prevention policies, safety management systems, and internal emergency plans have been created and implemented.72 The

current system. The Refinery NEP is a primary example of proactive inspections to verify compliance. It was discontinued in 2011. 67 The term Dioxin refers to a family of toxic chemicals. They have been characterized by EPA as likely to be human carcinogens and are anticipated to increase the risk of cancer at background levels of exposure. See http://www.epa.gov/pbt/pubs/dioxins.htm (accessed June 17, 2013). 68 The European Commission consists of 27 Commissioners and “represents the interests of the EU [European Union] as a whole. It proposes new legislation to the European Parliament and the Council of the European Union, and it ensures that EU law is correctly applied by member countries.” http://ec.europa.eu/atwork/index_en.htm (accessed May 6, 2013). 69 See http://ec.europa.eu/environment/seveso/ (accessed May 6, 2013). 70 The Seveso Directive was adopted in 1982 and was amended twice, in 1987 and 1988. On December 9, 1996, the Seveso II Directive was adopted and replaced the original Seveso Directive. The Seveso III Directive was then adopted on July 4, 2012, and became effective on August 13, 2012. Member States must implement Seveso III by June 1, 2015. http://ec.europa.eu/environment/seveso/ (accessed May 6, 2013). 71See http://ec.europa.eu/environment/seveso/legislation.htm (accessed May 6, 2013). 72 Seveso II Directive, Article 9 (1996). Available at http://eur- lex.europa.eu/LexUriServ/LexUriServ.do?uri=CONSLEG:1996L0082:20031231:EN:PDF (accessed July 15, 2013).

Chevron Richmond Refinery Regulatory Report May 2014

23

regulation also requires owners or operators to “prove to the competent authority…that he has taken all measures necessary as specified in this Directive.”73 On June 1, 1974, the Flixborough Works of Nypro (UK) Limited experienced a massive cyclohexane vapor cloud explosion, killing 28 workers and injuring 36 workers and hundreds of members of the public offsite. This incident along with the Seveso incident led to the Seveso Directive in 1982, and this was converted into legislation in the United Kingdom (UK) via the Control of Industrial Major Accident Hazards (CIMAH) 1984 Regulations. The Control of Major Accidents74 Hazards Regulations (COMAH) replaced CIMAH in April 1999 to conform to the updated Seveso II Directive. The Health and Safety Executive75 (HSE), the Environment Agency76 (EA), and the Scottish Environmental Protection Agency77 (SEPA) are considered to be the UK’s CA responsible for the enforcement of these regulations. A key feature differentiating these two regulations is the increasing emphasis from the operator having to “describe” the safety systems in CIMAH to being required to “demonstrate” their adequacy in COMAH.78

73 Seveso II Directive, Article 5, Paragraph 2 (1996). Available at http://eurlex.europa.eu/LexUriServ/LexUriServ.do?uri=CONSLEG:1996L0082:20031231:EN:PDF (accessed July 15, 2013). 74 The COMAH regulations define “major accident” as “an occurrence (including in particular, a major emission, fire or explosion) resulting from uncontrolled developments in the course of the operation of any establishment and leading to serious danger to human health or the environment, immediate or delayed, inside or outside the establishment, and involving one or more dangerous substances…” COMAH Regulations, Part 1, Regulation 2 (2005). 75 HSE is an independent regulator, and “act[s] in the public interest to reduce work-related death and serious injury across Great Britain’s workplaces.” See http://www.hse.gov.uk/aboutus/ (accessed May 7, 2013). According to the HSE’s Enforcement Policy Statement, the HSE’s purpose is “to protect the health, safety and welfare of people at work, and to safeguard others, mainly members of the public, who may be exposed to risks from the way work is carried out.” http://www.hse.gov.uk/pubns/hse41.pdf (accessed May 7, 2013). 76 EA is an Executive Non-departmental Public Body responsible for protecting the environment and promoting sustainable development. For more information see http://www.environment-agency.gov.uk/default.aspx (accessed July 17, 2013). 77 SEPA is Scotland’s environmental regulator, aimed at protecting and improving the environment. For more information see http://www.sepa.org.uk/ (accessed July 17, 2013). 78 COMAH Regulations. Schedule 4, Part 1. Purpose of safety reports is to “1. demonstrate[e] that a major accident prevention policy and a safety management system for implementing it have been put into effect in accordance with the information set out in Schedule 2; 2. Demonstrate[e] that major accident hazards have been identified and that the necessary measures have been taken to prevent such accidents and to limit their consequences for persons and the environment; 3. Demonstrate[e] that adequate safety and reliability have been incorporated into the – (a) design and construction, and (b) operation and maintenance, of any installation and equipment and infrastructure connected with its operation which are linked to major accident hazards within the establishment.…” (2005).

Chevron Richmond Refinery Regulatory Report May 2014

24

The COMAH regulations apply to all onshore facilities that have sufficient quantities of dangerous substances as listed in Schedule 179 of the regulations.80 The general duty for all duty holders of facilities covered under the COMAH regulations is to “take all measures necessary to prevent major accidents and limit their consequences to people and the environment.”81 The HSE interprets this duty as the equivalent of reducing risks82 to “as low as reasonably practicable,” or ALARP.83,84,85 Duty holders are required to prepare a safety report that “demonstrate[s] to the CA that all measures necessary for the prevention and mitigation of major accidents have been taken.”86 These reports must contain information for the CA to review and analyze, including a policy on preventing and mitigating major accidents; a management system for implementing that policy that complies with good practice;87 an effective method for identifying any major accidents that might occur; and measures to prevent and mitigate major accidents.88 To assist operators with reducing risks to ALARP, the HSE publishes guidance documents that contain good practice guidelines and standards and that discuss what constitutes good practice.89

79 Available at http://www.legislation.gov.uk/uksi/1999/743/schedule/1/made (accessed June 17, 2013). 80 COMAH Regulations, Part 1, Regulation 3 (2005). 81 COMAH Regulations, Part 2, Section 4 (2005). 82 HSE describes “risk” as “the likelihood that a hazard will actually cause its adverse effects, together with a measure of the effect.” See http://www.hse.gov.uk/risk/theory/alarpglance.htm (accessed May 7, 2013). 83 See http://www.hse.gov.uk/foi/internalops/hid_circs/permissioning/spc_perm_37/ (accessed May 15, 2013). 84 The principal health and safety legislation in the UK is the Health and Safety at Work etc. Act 1974. It requires employers to ensure that risks to employees and others are reduced “so far as is reasonably practicable,” or SFAIRP. Health and Safety at Work etc. Act, Part I, Section 2 (1) and (2) (1974). HSE has interpreted that SFAIRP duties call for the same set of tests to be applied as duties to reduce risks “as low as reasonably practicable,” or ALARP. According to HSE, “”the two terms mean essentially the same thing and at their core is the concept of ‘reasonably practicable’;…” See http://www.hse.gov.uk/risk/theory/alarpglance.htm (accessed May 7, 2013). 85 According to HSE, the concept of “reasonably practicable” “involves weighing a risk against the trouble, time and money needed to control it. Thus, ALARP describes the level to which [they] expect to see workplace risks controlled.” This allows HSE to “set goals for duty-holders, rather than being prescriptive; HSE’s policy is that any proposed regulatory action should be based on what is reasonably practicable.” According to HSE, in most situations, deciding whether the risks are ALARP involves a “comparison between the control measures a duty- holder has in place or is proposing and the measures [they] would normally expect to see in such circumstances i.e. relevant good practice. ‘Good practice’ is defined as ‘those standards for controlling risk that HSE has judged and recognized as satisfying the law, when applied to a particular relevant case, in an appropriate manner.’… Once what is good practice has been determined, much of the discussion with duty-holders about whether a risk is or will be ALARP is likely to be concerned with the relevance of the good practice, and how appropriately it has been (or will be) implemented.” See http://www.hse.gov.uk/risk/theory/alarpglance.htm (accessed May 7, 2013). 86COMAH Regulations, Schedule 4, Part 1 (2005). See http://www.hse.gov.uk/comah/background/comah99.htm (accessed May 7, 2013). 87 HSE defines “good practice” as “those standards for controlling risk that HSE has judged and recognized as satisfying the law, when applied to a particular relevant case, in an appropriate manner.” HSE, “Assessing compliance with the law in individual cases and the use of good practice,” May 2003. Available at http://www.hse.gov.uk/risk/theory/alarp2.htm (accessed June 11, 2013). 88 COMAH Regulations, Schedule 4, Part 2 (2005). See http://www.hse.gov.uk/comah/background/comah99.htm (accessed May 7, 2013). 89 Such as HSE’s “Guidance for the topic assessment of the major accident hazard aspects of safety cases,” published in April 2006, and HSE’s “Assessing compliance with the law in individual cases and the use of good practice,” May 2003, available at http://www.hse.gov.uk/risk/theory/alarp2.htm (accessed June 11, 2013).

Chevron Richmond Refinery Regulatory Report May 2014

25

  1. 2.1.2

Offshore The international offshore energy sector experienced several catastrophic incidents in the 1980s, including the Alexander Kielland 90 incident in Norway in 1980 which resulted in 123 fatalities, and the Piper Alpha91 incident in the UK in 1988, which fatally injured 167 workers. These incidents initiated offshore regulatory changes focused on risk reduction and control that were modeled after the CIMAH regulations. Following the Piper Alpha incident, the UK Secretary of State for the Department of Energy ordered that a public inquiry be held to determine the circumstances surrounding the incident.92 The Secretary directed Lord Cullen, a Senator of the College of Justice in Scotland, to hold the inquiry and report to the Secretary “the circumstances of the accident and its cause together with any observations and recommendations which he thinks fit to make with a view to the preservation of life and the avoidance of similar accidents in the future.”93 The result was The Public Inquiry into the Piper Alpha Disaster (“the Cullen Report”), an extensive report released in October 1990. The report called into question the adequacy of the detailed prescriptive regulatory regime that existed at the time of the incident94 for offshore oil and gas operations, and listed 106 recommendations to revamp offshore safety regulation in the UK, 57 of which the HSE was responsible for overseeing.95 The Cullen Report found that the operating company (Occidental Petroleum, a US company), “did not possess any system which ensured that such remote, but potentially disastrous, events were subjected to systematic scrutiny…[and] there was for major projects no comprehensive system of safety assessment and management did not appear to appreciate fully the contribution which it could make.”96 The report noted that there was a need for a formal safety assessment (FSA), “an assessment essentially equivalent to the Safety Case,”97 which “involves the identification and assessment of hazards over the whole life cycle of a project…[because]…the combinations of potential hardware and human failures are so numerous that a major accident hardly ever repeats itself…[and] [a] strategy for risk management must [] address the entire spectrum of possibilities.”98

90 The Alexander Kielland was a flotel for housing workers. A total of 212 people were on board when it capsized near the Edda platform in the Ekofisk area of the North Sea on March 27, 1980. As a result of this incident, 123 individuals lost their lives and only 89 survived. 91 On July 6, 1988, an explosion occurred aboard the Piper Alpha oil production platform 120 miles off the coast of Scotland in the North Sea. A series of explosions and fire killed 167 workers and almost completed destroyed the platform. This incident became the deadliest accident in the history of the offshore industry. 92 Department of Energy. The Public Inquiry into the Piper Alpha Disaster; Presented to Parliament by the Secretary of State for Energy by Command of her Majesty; November 1990; p iii. 93 Department of Energy. The Public Inquiry into the Piper Alpha Disaster; Presented to Parliament by the Secretary of State for Energy by Command of her Majesty; November 1990; p iv. 94Department of Energy. The Public Inquiry into the Piper Alpha Disaster; Presented to Parliament by the Secretary of State for Energy by Command of her Majesty; November 1990; p 27. 95 Oil &Gas UK. Piper Alpha: Lessons Learnt; 2008; p 2. 96 Department of Energy. The Public Inquiry into the Piper Alpha Disaster; Presented to Parliament by the Secretary of State for Energy by Command of her Majesty; November 1990; p 275. 97 Lord Cullen describes the Safety Case as “a means by which an operator demonstrates to itself the safety of its activities…[and] as the basis for the regulation of major hazard activities…” Ibid at 276-277. 98 Ibid.

Chevron Richmond Refinery Regulatory Report May 2014

26

In his analysis, Lord Cullen noted that the current offshore regulations were prescriptive in nature rather than goal-setting, and that this had the effect of hampering operators’ flexibility and stifling innovation.99 He stated that “one of the reasons for adopting the goal-setting approach was to make regulations that were more flexible, so that changing technology could be accommodated without the need for new legislation.”100 Lord Cullen pointed to the CIMAH Regulations, discussed above, as a forward-looking regulatory model, which required onshore major hazard installation operators to “provide HSE with a written report on the safety of the installation…commonly called the Safety Case.”101 Lord Cullen noted that the safety case “is a means by which an operator demonstrates to itself the safety of its activities…[and] also serves as the basis for the regulation of major hazard activities.”102 Lord Cullen concluded that an FSA “is an essential element in a modern safety regime for major hazard installations…that this FSA should take the form of a Safety Case…[and that] [t]he regime should have as its central feature demonstration of safe operation by the operator.”103 He recommended that a safety case regulatory regime be implemented offshore for both fixed and mobile installations as it already was for onshore major hazard installations, that it be complemented by other regulations dealing with specific features, that the safety case contain goal-setting regulations, and that it be part of a continuing dialogue between the operator and the regulatory body.104 Lord Cullen recommended the implementation of safety regulations requiring the owner or operator of every fixed and mobile installation operating in UK waters to submit a safety case to HSE. In response, the UK established the Offshore Installations (Safety Case) Regulations in 1992.105 The primary goal of these Regulations was “to reduce the risks from major accident hazards to the health and safety of the workforce employed on offshore installations or in connected activities.”106 Oil & Gas UK, 107 the main UK offshore oil industry trade association whose members include the major oil companies that operate in the Gulf of Mexico (such Shell and Exxon), has expressed strong support for the safety case regime. In its response to the European Commission’s published draft legislative proposals to modify offshore safety case regulations, Oil & Gas UK noted that those proposals would undermine the “proactive, flexible and responsive approach to managing risks, borne out of the lessons learnt from Piper Alpha as well as the evolving nature of the offshore oil and gas business itself.”108 In the wake of the Macondo incident in the Gulf of Mexico, the UK government directed Professor Geoffrey

99 Department of Energy. The Public Inquiry into the Piper Alpha Disaster; Presented to Parliament by the Secretary of State for Energy by Command of her Majesty; November 1990; p 339. 100 Department of Energy. The Public Inquiry into the Piper Alpha Disaster; Presented to Parliament by the Secretary of State for Energy by Command of her Majesty; November 1990; p 364. 101 Ibid at 276. 102 Ibid at 276 and 277. 103 Ibid at 282. 104 Ibid at 283 and 284. 105 The 1992 Regulations have since been replaced by the Offshore Installations (Safety Case) Regulations 2005, which were effective as of April 6, 2006. The objective of the revisions in 2005 was “to improve the effectiveness of the regulations whilst at the same time reducing the burden of three yearly resubmissions.” Oil & Gas UK. Piper Alpha: Lessons Learnt; 2008. 106 HSE. A Guide to the Offshore Installations (Safety Case) Regulations 2005: Guidance on Regulations; 2006; p

  1. http://www.hse.gov.uk/pubns/priced/l30.pdf (accessed May 7, 2013).

107 See http://www.oilandgasuk.co.uk/aboutus/aboutus.cfm (accessed December 10, 2013). 108 Oil & Gas UK. European Commission Proposed Regulation on Offshore Safety and Related Issues: Oil & Gas UK Position Paper. November 2011; p 1. http://www.oilandgasuk.co.uk/ProposedEURegulation.cfm (accessed December 10, 2013).

Chevron Richmond Refinery Regulatory Report May 2014

27

Maitland of Imperial College London to lead an independent review of the offshore safety case regime in the UK.109 In the report stemming from the review, which highlighted strengths of the safety case regime as well as recommendations for improvement, Professor Maitland commended the UK’s “‘goal-setting’ safety regime and its ability to foster innovation and continuous improvement in process integrity…”110 and noted that the UK authorities, including the HSE, are held in high regard by both the UK operators and international observers.111 3.2.2 Global Analysis of Safety Case Implementation 3.2.2.1 Australia 3.2.2.1.1 Offshore Following the Piper Alpha disaster in 1988, the then Australian Commonwealth Minister for Resources at the time, Senator Peter Cook, formed a Consultative Committee on Safety in the Offshore Petroleum Industry to advise him on safety issues surrounding offshore operations in Australia. In 1991, the Committee released its Report of the Consultative Committee on Safety in the Offshore Petroleum Industry.112 In the report, the Committee examined the circumstances, causes, and recommendations described in both the Cullen Report and Esso Australia’s113 investigation report on a fire that occurred on the Tuna platform in April 1989 in Bass Strait that injured four individuals. The Committee noted that while there were many differences between the two incidents, they “both demonstrated the need for greater attention to the management of safety in a number of areas of offshore operations.”114 They pointed to the safety case as an important regulatory concept that should be applied to oil and gas operations in Australian waters, and concluded by recommending that the safety case concept described by Lord Cullen and carried out onshore by the Seveso Directive and CIMAH regulations be adopted for Australian offshore petroleum operations.115 It would “require the operator of a facility to formally document how safety is to be managed within the facility, [and] [] demonstrate that the major hazards of the installation have been identified and appropriate controls provided…”116 The Committee also recommended the implementation of both prescriptive and “objective” regulations.117 At that time, offshore petroleum safety was the joint responsibility of the Commonwealth and the States/Northern Territory. Following this inquiry, new Commonwealth regulations were created: for example, Schedule

109 Maitland, Geoffrey. Offshore Oil and Gas in the UK: an independent review of the regulatory regime. December 2011. https://www.gov.uk/government/uploads/system/uploads/attachment_data/file/48252/3875- offshore-oil-gas-uk-ind-rev.pdf (accessed December 10, 2013). 110 Ibid at 3. 111 Ibid at 3. 112 See http://www.mrt.tas.gov.au/mrtdoc/petxplor/download/OR_0935/OR_0935.pdf (accessed May 8, 2013). 113 Esso was an oil and gas company in Australia that was sold to Mobil Oil Corporation in 1990. It is now part of Exxon Mobil. See http://www.exxonmobil.com/Australia-English/PA/about_who_history_esso.aspx (accessed May 8, 2013). 114 Report of the Consultative Committee on Safety in the Offshore Petroleum Industry, 1991; p 2. See http://www.mrt.tas.gov.au/mrtdoc/petxplor/download/OR_0935/OR_0935.pdf (accessed May 8, 2013). 115 Ibid at 25. 116 Report of the Consultative Committee on Safety in the Offshore Petroleum Industry, 1991; p 3. See http://www.mrt.tas.gov.au/mrtdoc/petxplor/download/OR_0935/OR_0935.pdf (accessed May 8, 2013). 117 Ibid.

Chevron Richmond Refinery Regulatory Report May 2014

28

8 on “Occupational Health and Safety” was added to the Petroleum Submerged Lands Act (PSLA) in 1992 to require safety cases to be developed for all offshore petroleum facilities. The Offshore Petroleum and Greenhouse Gas Storage (Safety) Regulations 2009 set out the requirements for the contents of offshore safety cases. The operator of an offshore petroleum facility must submit a safety case for review and acceptance to the Australian National Offshore Petroleum Safety and Environmental Management Authority (NOPSEMA), the Australian Commonwealth Statutory Agency charged with regulating the health and safety, structural integrity, and environmental management of all offshore petroleum facilities in Australian Commonwealth waters, and in coastal waters where State powers have been reduced. NOPSEMA accepts a safety case “if it is satisfied that the arrangements set out in the document demonstrate that the risks will be reduced to…ALARP.”118 3.2.2.1.2 Onshore In 1998, Esso Australia’s gas plant at Longford in Victoria suffered a major release and fire caused by cold temperature embrittlement due to a process upset and lack of engineering support for diagnosis, which resulted in two fatalities, eight additional injuries, and cut the State of Victoria’s gas supply for two weeks causing major industrial disruption and workforce stand downs. While the safety case at this time was required for offshore operations in Australia, onshore facilities like the Longford plant were subject only to prescriptive provisions contained within the Victoria Occupational Health and Safety Act 1985. In its report on the incident, the Royal Commission concluded that all major hazard facilities in Victoria should be required to develop and submit a safety case to the appropriate regulatory authority. In 1996, Australia’s National Occupational Health and Safety Commission119 (NOHSC) recommended the safety case be adopted for all major onshore hazard facilities in Australia, and in 2002 NOHSC established a National Standard for the Control of Major Hazard Facilities and a National Code of Practice for the Control of Major Hazard Facilities.120 The Standard states that operators of major hazard facilities “shall provide the relevant public authority with a safety report…” that, among other things, identifies the type, relative likelihood and consequences of major accidents that might occur, and provides details of the safety management system (SMS) for that facility.121 In addition, operators of major hazard facilities must identify all major hazards and the risks associated with those hazards, and minimize each risk “so far as practicable.”122

118 See http://www.nopsema.gov.au/safety/safety-case/what-is-a-safety-case/ (accessed July 15, 2013). 119 In 1985 The National Occupational Health and Safety Commission (NOHSC) was established as a tripartite body to develop, facilitate and implement a unified national approach to occupational health and safety in Australia. On January 1, 2006, NOHSC was replaced by the Australian Safety and Compensation Council (ASCC). On March 31, 2009, the ASCC was abolished and replaced with Safe Work Australia. Safe Work Australia was established by the Safe Work Australia Act 2008 with the authority to help develop policy to improve worker health, safety, and compensation across Australia. It does not regulate work health and safety laws; rather it develops national policy. See http://www.safeworkaustralia.gov.au/sites/swa/about/pages/about (accessed May 8, 2013). 120 National standards are documents which prescribe preventative action to avert occupational deaths, injuries and diseases; national codes of practice are documents prepared for the purpose of advising employers and workers of acceptable ways of achieving national standards. National Standard for the Control of Major Hazard Facilities [NOHSC: 1014(2002)], p 2. http://www.safeworkaustralia.gov.au/sites/SWA/about/Publications/Documents/271/NationalStandard_ControlMajo rHazardFacilities_NOHSC_1014-2002_PDF.pdf (accessed May 8, 2013). 121 Ibid at 13. 122 Ibid at 12.

Chevron Richmond Refinery Regulatory Report May 2014

29

According to the Australian Safety and Compensation Council’s 2004 Annual Situation Report for the National Standard for the Control of Major Hazard Facilities, all Australian jurisdictions were expected to have the standard in place before the end of 2005, roughly three years after its inception.123 3.2.2.2 Norway Following the capsizing of the Alexander Kielland in 1980, Norway moved in a direction similar to the European Commission and developed performance-based regulations focused on major accident prevention. Although the country did not adopt the safety case regulatory regime per se, the current regulatory approach implements many similar elements. Currently in Norway, the Petroleum Safety Authority124 (PSA) regulates safety for activities at onshore and offshore major hazard facilities, and requires the responsible party125 to reduce risk “to the extent possible,” and “select technical, operational and organisational solutions that reduce the probability that harm, errors and hazard and accident situations occur.”126 This concept is akin to ALARP whereby companies choose the solutions and barriers that have the greatest risk-reducing effect, provided the costs are not significantly disproportionate to the risk reduction achieved.127 However, unlike the UK and Australia, PSA regulations do not require the submission of a safety case report by the operator of a facility, although facilities are still expected to develop them and make them available to the regulator upon request for auditing purposes. Rather, PSA “supervises” industry, as explained in the following: Supervision involves much more than audits offshore or on land. It embraces the total contact between the regulator and the regulated. It covers everything which gives the PSA the necessary basis to determine whether the companies are accepting their responsibility to operate acceptably in all phases. Supervisory activities include investigations, considering consent applications and meetings with the industry.128 As will be discussed below, because the safety case regulatory approach requires the regulator to conduct detailed assessments of safety case reports and auditing of facilities against the safety case, its implementation requires substantial funding to support and maintain a sufficient number of highly experienced and competent staff.

123Australian Safety and Compensation Council. Major Hazard Facilities Annual Situation Report; 2004; p1. http://www.safeworkaustralia.gov.au/sites/SWA/about/Publications/Documents/475/MHFAnSituationReport_2004. pdf (accessed May 8, 2013). 124 The Petroleum Safety Authority (PSA) is “the regulatory authority for technical and operational safety and for the working environment.” PSA was created in 2004 as a result of a government decision to split the Norwegian Petroleum Directorate (NPD) into two parts. See http://www.ptil.no/main-page/category9.html (accessed May 8, 2013). 125 PSA defines a “responsible party” as “[t]he operator and others participating in activities covered by these regulations, without being a licensee or owner of an onshore facility.” Regulations Relating to Health, Safety and the Environment in the Petroleum Activities and at Certain Onshore Facilities (The Framework Regulations); Section 6(a). Definitions. http://www.ptil.no/framework-hse/category403.html (accessed November 26, 2013). 126 PSA. Regulations Relating to Health, Safety and the Environment in the Petroleum Activities and at Certain Onshore Facilities (The Framework Regulations); Section 11, Risk Reduction Principles. http://www.ptil.no/framework-hse/category403.html (accessed November 26, 2013). 127 Ibid. 128 http://www.ptil.no/supervision/what-is-supervision-article8519-88.html (accessed June 3, 2013).

Chevron Richmond Refinery Regulatory Report May 2014

30

  1. 2.2.3

The United States Despite the international shift to the safety case regime and even though major oil companies that operate both onshore and offshore in the US also operate globally under safety case regimes and have shown support for the safety case,129 the US has persisted in the use of a more activity-based regulatory scheme that does not contain a specific risk reduction target and that lacks the ability to adapt to advancing technology and recently developed industry standards. Due to the major potential hazards present in onshore and offshore oil and gas operations, these sectors should have in place adaptable safety regimes that adequately engage companies and their employees in continuous improvement and risk reduction. As the CSB has devoted extensive time and resources to studying and analyzing the regulation of offshore oil and gas facilities in the US as a result of its Macondo incident investigation, this report will focus on the regulation of onshore oil and gas operations in the US and California. On October 23, 1989, a massive explosion and fire occurred at the Phillips 66 Company’s Houston Chemical Complex in Pasadena, Texas, resulting in 23 fatalities and injuring more than 130. In response, the U.S. Department of Labor issued a report to the President and declared, among other things, that the U.S. Occupational Safety and Health Administration (OSHA) would “expedite completion of its rulemaking requiring employers to implement comprehensive chemical process safety management plans for hazardous chemical processes.”130 Sparked by a number of serious accidents, including the Phillips 66 incident and the 1984 toxic release in Bhopal, India, which resulted in several thousand known fatalities, OSHA published in the Federal Register (55 FR 29150) on July 17, 1990, a proposed standard containing requirements for the management of hazards associated with processes using highly hazardous chemicals.131 Soon after, Congress adopted the Clean Air Act (CAA) Amendments (CAAA) of 1990,

129A Shell Oil Company representative testified at the CSB December 2010 public meeting on the safety case that the company had been using the safety case globally since 2002, and noted that the most valuable aspect of that type of regulatory regime was the need to demonstrate that major hazards have been managed using effective barriers and controls. Shell Geelong Refinery Plant Manager Huck Poh has stated, “As a Major Hazard Facility, Shell Geelong Refinery and Lara Terminal is required to submit a Safety Case for assessment by Safe Work Victoria. This document is a summary of that Safety Case and explains the potential impact of the facility on our neighbours and the community. We take a systematic approach to managing safety and preventing incidents that place our people, our neighbours, the Geelong community, the environment and our facilities at risk. This is reflected in our Safety Management System and the approach that has been undertaken for the development and review of the Safety Case. Shell is committed to achieving continuous Health, Safety, Security and Environment (HSSE) performance improvement. There are ongoing review and revision activities to ensure our analyses remain relevant and reflect the current status of operations and our risk reduction measures are consistent with latest industry practice. This commitment to continuous improvement is reflected in the Shell HSSE Policy and supported by our HSSE results.” See http://s04.static-shell.com/content/dam/shell-new/local/country/aus/downloads/geelong/safety-case- summary.pdf p3. (accessed December 10, 2013). Esso Longford Plant Manager Monte Olson has stated that “[t]he Safety Case is a systematic and comprehensive review of our operations and processes which includes the identification of potential major incidents that could occur, assesses the risks associated with these major incidents and demonstrates the controls we have in place to manage these risks to as low as reasonably practicable.” See http://www.exxonmobil.com/Australia-English/PA/Files/publication_Longford_Safety_Case_2013.pdf p5. (accessed December 10, 2013) 130 Dole, Elizabeth. Phillips 66 Company Houston Chemical Complex Explosion and Fire: Implications for Safety and Health in the Petrochemical Industry, A Report to the President; April 1990; p ix. http://ncsp.tamu.edu/reports/phillips/first%20part.pdf (accessed August 6, 2013). 131 Preamble to Process Safety Management of Highly Hazardous Chemicals; Explosives and Blasting Agents. Section 1 – I. Background (March 4, 1992). See http://www.osha.gov/pls/oshaweb/owadisp.show_document?p_table=PREAMBLES&p_id=1039 (accessed May 10, 2013).

Chevron Richmond Refinery Regulatory Report May 2014

31

which resulted in the creation of the CSB and authorized the first federal regulations specifically designed to prevent major chemical accidents that threaten workers, the public, and the environment: OSHA’s Process Safety Management (PSM) standard and the U.S. Environmental Protection Agency’s (EPA’s) Risk Management Program. 3.2.2.3.1 OSHA PSM Standard Section 304 of the CAAA mandated that OSHA develop “a chemical process safety standard designed to protect employees from hazards associated with accidental release of highly hazardous chemicals in the workplace.”132 OSHA responded by adopting 29 CFR §1910.119 Process Safety Management of Highly Hazardous Chemicals (“the PSM standard”) in 1992. The PSM standard applies to a process133 involving a chemical at or above the listed threshold quantity (also known as a highly hazardous chemical), or flammables in a quantity of 10,000 pounds or more.134 It contains 14 elements with broad requirements to implement management systems, identify and control hazards, and prevent “catastrophic releases of highly hazardous chemicals.” While the PSM standard was intended to be performance-based and does contain some goal-setting elements, a majority of the standard is activity-based, and there is no general duty requirement under the PSM standard to reduce risks to a certain extent or prevent catastrophic accidents. As will be discussed at length in Section 4.3, the PSM standard has essentially remained stagnant since its inception in 1992. According to the Center for Chemical Process Safety (CCPS), the PSM standard has resulted “in a minimum cost, compliance-based approach to managing process safety… ‘If [it] isn’t a regulatory requirement, I’m not going to do it!’”135 A key provision of the PSM standard is the process hazard analysis (PHA) of covered processes. 136 PHA requirements include a review of the process to identify, evaluate, and control the hazards, and an evaluation of the consequences of failure of those controls.137,138 The PHA required by the OSHA PSM standard is an example of a goal-setting requirement in that it allows for a variety of hazard analysis methodologies to be performed to satisfy the requirement. However, the element is activity-based in that completing a PHA for each covered process and updating it at least every five years is satisfactory. The regulator is not responsible for evaluating the effectiveness of controls or safeguards, and there is no requirement to reduce risks to a certain extent such as ALARP. Thus, the resulting PHA that meets the

132 Clean Air Act Amendments of 1990. Section 304(a). November 5, 1990. See http://www.epa.gov/air/caa/caaa.txt (accessed May 10, 2013). 133 The PSM standard defines “process” as “any activity involving a highly hazardous chemical including any use, storage, manufacturing, handling, or the on-site movement of such chemicals, or combination of these activities.” 29 CFR §1910.119(b) (1992). 134 29 CFR §1910.119(a)(1) (1992). This standard also applies to the manufacture of explosives and pyrotechnics in any quantity [29 CFR §1910.109(k)(2) & (3)]. 135 CCPS. Guidelines for Risk Based Process Safety. 2007; p 2. 136 A Process hazard analysis is a thorough, orderly, systematic approach for identifying, evaluating, and controlling hazards of processes involving highly hazardous chemicals. The employer must perform an initial process hazard analysis on all processes covered by the PSM standard and all process hazard analyses must be updated and revalidated, based on their completion date, every five years. See http://www.osha.gov/doc/outreachtraining/htmlfiles/psm.html (accessed May 10, 2013). 137 29 CFR §1910.119(e) (1992). 138 The other elements of the PSM standard are process safety information, operating procedures, employee participation, training, contractor safety, pre-startup safety review, mechanical integrity, hot work permits, management of change, incident investigation, emergency planning and response, and compliance audits. The 14th “element” is mainly a requirement that maintaining trade secrecy not interfere with an employer’s compliance with the other 13 elements.

Chevron Richmond Refinery Regulatory Report May 2014

32

regulatory requirements of “controlling” hazards may actually inadequately identify or mitigate the hazards. In addition, there is no requirement for employers to submit their PHAs to the regulator for review. In most cases, this means the regulator will not review these PHAs until there is a significant process accident, a complaint, or a (rare) planned inspection.

Another key element of the PSM standard, the Management of Change (MOC) provision, requires the development of written procedures “to manage changes to process chemicals, technology, equipment, and procedures…”139 The procedures must consider, among other things, the technical basis for a proposed change and its potential impact on safety and health.140 Historically, the MOC requirement has been treated and enforced as an activity-based requirement as well. For example, when the BP Texas City refinery explosion and fire occurred on March 23, 2005, all 15 fatalities and many of the 180 injuries occurred in or around nine contractor trailers that were sited near process areas and as close as 121 feet to the isomerization (ISOM) unit where the incident occurred. The refinery had been using trailers as temporary office spaces for several years. The refinery addressed facility siting for trailers during its 2004 MOC for an upcoming 2005 turnaround. The MOC form indicated that a double-wide mobile office trailer would be temporarily sited in the open area between the ISOM and naphtha desulfurization units (NDU) for use during the upcoming turnaround, to be removed at the end of April 2005. However, the MOC did not analyze siting hazards; rather the MOC team attached a drawing showing the proposed interior configuration of the trailer and measured its location from the catalyst warehouse.141 In early 2005, eight other trailers were sited between the ISOM and NDU without even conducting an MOC. The CSB pointed out in its Urgent Recommendations stemming from the Texas City incident that these trailers could have been easily relocated to less hazardous sites, and BP did so following the incident.142 Despite this fact, BP’s siting policy considered that utilizing trailers in this way posed little or no danger to occupants, which conformed with the American Petroleum Institute’s (API) Recommended Practice (RP) 752, Management of Hazards Associated with Location of Process Plant Buildings.

Although the MOC failed to identify or analyze hazards stemming from siting trailers so close to process areas, OSHA did not cite BP for conducting a poor MOC following the incident, as merely completing the MOC satisfied the requirements of the PSM standard. As it would have been very practical to move the trailers to a safer location, a regulator under the safety case regulatory regime would have the ability to require BP to do just that to reduce risks to ALARP.

The OSHA PSM standard includes requirements for two of its 14 elements – mechanical integrity and process safety information (PSI) – to comply with recognized and generally accepted good engineering practices, or RAGAGEP.143 RAGAGEPs are technologically focused, with no emphasis on

139 29 CFR §1910.119(l)(1) (1992). 140 Id at (l)(2)(i) and (ii) (1992). 141 To learn more about the PHA and MOC processes relating to the BP Texas City Refinery, see the CSB BP Texas City Final Investigation Report at http://www.csb.gov/assets/1/19/CSBFinalReportBP.pdf (accessed October 24. 2013). 142 See CSB Urgent Trailer Siting Recommendations at http://www.csb.gov/assets/1/19/BP_Recs_2.pdf (accessed October 24. 2013). 143 RAGAGEPs “are engineering, operation, or maintenance activities based on established codes, standards, published technical reports or recommended practices (RP) or a similar document. RAGAGEPs detail generally approved ways to perform specific engineering, inspection or mechanical integrity activities, such as fabricating a

Chevron Richmond Refinery Regulatory Report May 2014

33

organizational, human factors, or culture-based measures. OSHA developed the mechanical integrity RAGAGEP requirement to “make sure that process equipment is inspected and tested properly, and that the inspections and tests are performed in accordance with appropriate codes and standards.”144 OSHA has recognized a number of practices, guidelines, and standards as RAGAGEPs, including the American Society of Civil Engineers, Design of Blast Resistant Buildings in Petrochemical Facilities, the Department of Defense, TMS-1300 Structures to Resist the Effects of Accidental Explosions, and the American Petroleum Institute (API) Recommended Practice (RP) 520: Sizing, Selection, and Installation of Pressure-Relieving Devices in Refineries.145 Unlike other regulators such as the HSE, OSHA has not compiled a comprehensive list of good practices, or RAGAGEPs, for companies to utilize during operations, and the CSB has only identified two OSHA Letters of Interpretation regarding implementation of RAGAGEP in PSM. According to CCPS, “[o]rganizations lack a thorough understanding of recognized and generally accepted good engineering practices and are inconsistent in interpreting and applying them.”146 In addition, key PSM elements such as PHA, incident investigation, and MOC do not reference RAGAGEP, and have not kept up to date with good practice guidelines, including CCPS’ Guidelines for Risk Based Process Safety, which addresses 20 PSM elements for process safety, including human factors, workforce involvement, and safety culture.

Historically, OSHA has primarily enforced147 RAGAGEP reactively, and may cite companies for violations of RAGAGEPs following an incident. For example, following the BP Texas City Refinery incident, OSHA issued BP hundreds of citations, some of which covered BP’s willful violations of API 520 and the American Society of Mechanical Engineers (ASME) Boiler and Pressure Vessel Code, both considered by OSHA to be RAGAGEPs. Following the Chevron incident, California’s Division of Occupational Safety and Health (Cal/OSHA) issued Chevron two willful citations for allegedly not complying with API RP 939-C, Guidelines for Avoiding Sulfidation (Sulfidic) Corrosion Failures in Oil Refineries and Chevron’s own internal corrosion mitigation plan as RAGAGEPs (this will be discussed in greater detail in Section 5.1.2.2).

  1. 2.2.3.2 U.S. Environmental Protection Agency Risk Management Program

Section 301(r) of the CAAA called for EPA to develop regulations related to the prevention and detection of accidental releases for regulated substances, including requiring owners or operators of stationary sources that have regulated substances present to prepare and implement a “risk management plan to

vessel, inspecting a storage tank, or servicing a relief valve.” OSHA Instruction CPL 03-00-004. June 7, 2007. https://www.osha.gov/pls/oshaweb/owadisp.show_document?p_id=3589&p_table=DIRECTIVES (accessed August 13, 2013). 144 OSHA. Preamble to 29 CFR Part 1910, Process Safety Management of Highly Hazardous Chemicals, Section 3, Title III. Summary and Explanation of the Final Rule, 1992. Available at http://www.osha.gov/pls/oshaweb/owadisp.show_document?p_table=PREAMBLES&p_id=1041 (accessed June 6, 2013). 145 All three are cited in OSHA Letter of Interpretation. Applicability of the PSM standard’s mechanical integrity requirements to refinery structures, February 1, 2010. http://www.osha.gov/pls/oshaweb/owadisp.show_document?p_table=INTERPRETATIONS&p_id=27443 (accessed June 6, 2013). 146 CCPS. Guidelines for Risk Based Process Safety. 2007; p 2. 147 An exception to this would be OSHA’s NEP that was implemented from 2007 to 2011, where OSHA inspectors cited to RAGAGEP following NEP audits.

Chevron Richmond Refinery Regulatory Report May 2014

34

detect and prevent or minimize accidental releases of such substances from the stationary source.…”148 The risk management plan would require a “hazard assessment to assess the potential effects of an accidental release of any regulated substance.”149 In 1996, EPA promulgated the Risk Management Program regulations at 40 CFR Part 68, which went into effect in 1999.

The EPA’s Risk Management Program requires facilities that contain more than the threshold quantity of any of the 77 listed toxic chemicals or 63 flammable substances150 to prepare and submit to the regulating agency emergency contact information, descriptions of processes and hazardous chemicals onsite, an accident history, and worst-case release scenarios.151 The regulation defines three different Program levels (Program 1, 2, or 3) based on a process unit’s potential for impact to the public and the requirements to prevent accidents.152 Program 3 processes are subject to additional, more stringent requirements to prevent accidents similar to those of the OSHA PSM standard. Program 3 facilities must implement elements of a prevention program, including: process safety information (PSI), PHA, standard operating procedures (SOPs), training, mechanical integrity, compliance audits, incident investigations, MOC, pre-startup reviews, employee participation, and hot work permits. These prevention program elements are based primarily on the OSHA PSM standard, and much of the language contained in each element is identical to the PSM standard. As such, the Risk Management Program regulations contain the same RAGAGEP requirements for mechanical integrity and PSI as the OSHA PSM standard for covered facilities. For example, 40 CFR §68.48 requires an owner or operator to “ensure that the process is designed in compliance with recognized and generally accepted good engineering practices [RAGAGEP].”153 Like OSHA, the EPA is able to cite facilities for failure to comply with RAGAGEP following an incident, but does not maintain a list of RAGAGEPs for reference.

Finally, each covered facility must submit a risk management plan (RMP) to EPA for all covered processes154 and update and resubmit these plans at least once every five years, or whenever a major accident occurs or the emergency contact information changes. Completing and submitting the RMP satisfies the regulatory requirement; again, the effectiveness of the RMP in risk reduction is not assessed by the EPA, rendering this another activity-based requirement for a covered facility. There is no approval of the RMP by the EPA, and there is no additional duty on the facility to implement what it says it is doing in the RMP, unlike the safety case regulatory regime.

Any facility with one or more covered processes must include in its RMP an executive summary; the registration for the facility; the certification statement; a worst-case scenario for each process involving flammables or toxics; the five-year accident history for each process; information concerning emergency

148 Clean Air Act Amendments of 1990. Section 301(r)(7)(B)(ii). November 5, 1990. See http://www.epa.gov/air/caa/caaa.txt (accessed May 10, 2013). 149 Clean Air Act Amendments of 1990. Section 301(r)(7)(B)(ii)(I). November 5, 1990. See http://www.epa.gov/air/caa/caaa.txt (accessed May 10, 2013). 150According to 40 CFR §68.10(a), “[a]n owner or operator of a stationary source that has more than a threshold quantity of a regulated substance in a process, as determined under §68.115, shall comply with the requirements of this part no later than the latest of the following dates…” 151 See 40 CFR §68.12. General Requirements. 152 See 40 CFR §68.10. Applicability. 153 40 CFR §68.48(b) (1999). Additionally see 40 CFR §68.56 (d) which requires the owner or operator‘s inspection and testing procedures to “follow recognized and generally accepted good engineering practices.” 154 40 CFR §68.150 (1999).

Chevron Richmond Refinery Regulatory Report May 2014

35

response at the facility; at least one alternative release scenario analysis for each regulated toxic substance or flammable; a summary of the prevention program for each Program 2 process; and a summary of the prevention program for each Program 3 process.155

The CSB found in its BP Texas City Investigation Report that as of March 2007, the RMP regulation had focused primarily on reviewing the submitted RMPs and required updates by covered facilities. The EPA Office of Inspector General (OIG) concluded in 2009 that over half of the RMP-covered facilities identified in the US as high-risk156 had never received an on-site inspection or audit, and over 65 percent of all active RMP facilities had not received an on-site inspection or audit since inception of the RMP program in 1999.157 The EPA OIG also noted that of the 296 uninspected high-risk facilities regulated by the EPA, 151 of these could each impact 100,000 people or more in a worst-case accident scenario.158

  1. 2.2.3.3 Safety Case in the United States

In contrast to its mainly activity-based regulation of hazardous chemicals, including oil and gas operations, the US has adopted a more goal-based regulatory approach for its nuclear and aeronautics and space science sectors. The U.S. Nuclear Regulatory Commission (NRC) was an early adopter of goal or performance-based regulation, which it defines as “[a] regulatory approach that focuses on desired, measureable outcomes, rather than prescriptive processes, techniques, or procedures…[and] leads to defined results without specific direction regarding how those results are to be obtained.”159 According to the NRC, performance-based regulations permit licensees to “have flexibility to determine how to meet the established performance criteria in ways that encourage and reward improved outcomes.”160 The NRC’s Reactor Oversight Process, the means by which it achieves its mission of public health and safety in commercial nuclear power plant operations, is its primary

155 EPA Office of Solid Waste and Emergency Response. General Guidance on Risk Management Programs for Chemical Accident Prevention (40 CFR Part 68); March 2009; pp 9-1 and 9-2. See http://www.epa.gov/osweroe1/docs/chem/Toc_final.pdf (accessed May 14, 2013). 156 A high-risk facility is one that meets one of more of the following characteristics established by the EPA Office of Emergency Management: 1) Facilities whose reported RMP worst-case scenario population exceeds 100,000 people; 2) Any RMP Program facility with a hazard index greater than or equal to 25; and/or 3) Facilities that have had one or more significant accidental releases within the previous five years. See “EPA Office of Inspector General, “Improvements Needed in EPA Training and Oversight for Risk Management Program Inspections.” March 21, 2013; Page 5. Available at http://www.epa.gov/oig/reports/2013/20130321-13-P-0178.pdf (accessed June 11, 2013). 157 EPA OIG. Evaluation Report: EPA Can Improve Implementation of the Risk Management Program for Airborne Chemical Releases; February 10, 2009; p 15. 158 Ibid. 159 See NRC Glossary, available at http://www.nrc.gov/reading-rm/basic-ref/glossary/performance-based- regulation.html (accessed June 10, 2013). 160 US NRC NUREG/BR-0303. Guidance for Performance-Based Regulation (2002). http://www.nrc.gov/reading- rm/doc-collections/nuregs/brochures/br0303/br0303.pdf (accessed June 13, 2013).

Chevron Richmond Refinery Regulatory Report May 2014

36

performance-based regulation.161 It uses seven “cornerstones,” such as mitigating systems and barrier integrity, to monitor three performance areas (reactor safety, radiation safety, and security safeguards).162 Licensee performance data, inspection plans, quarterly assessments, and assessment and inspection responses are tied to each performance area and several cross-cutting objectives, such as worker involvement and human performance.163 Licensees are permitted to choose the precise methods they use to meet overarching performance goals, which are guided by their duty to reduce risks to as low as reasonably achievable, or ALARA.164,165 The NRC has stated that this flexibility is one of the main reasons that its regulatory philosophy encourages continuous improvement.166

The National Aeronautics and Space Administration (NASA) has the goal of implementing a safety system that is “as safe as reasonably practicable,” or ASARP,167 which it considers to be closely related to ALARP. NASA relies on a risk-informed safety case, or RISC,168 to ensure that the system’s safety objectives, goals, and thresholds have been achieved, and that safety risk is as low as possible within reasonable impacts on cost, schedule, and performance.169

161 http://www.nrc.gov/about-nrc/regulatory/risk-informed/concept/performance.html#example (accessed June 13, 2013). 162 NRC Reactor Oversight Process publication (2006), available at http://pbadupws.nrc.gov/docs/ML0708/ML070890365.pdf (accessed June 13, 2013). 163 NRC Reactor Oversight Process publication (2006), available at http://pbadupws.nrc.gov/docs/ML0708/ML070890365.pdf (accessed June 13, 2013). 164 US NRC NUREG/BR-0303, Guidance for Performance-Based Regulation (2002). http://www.nrc.gov/reading- rm/doc-collections/nuregs/brochures/br0303/br0303.pdf (accessed June 13, 2013). 165 ALARA “means making every reasonable effort to maintain exposures to radiation as far below the dose limits in this part as is practical consistent with the purpose for which the licensed activity is undertaken, taking into account the state of technology, the economics of improvements in relation to state of technology, the economics of improvements in relation to benefits to the public health and safety, and other societal and socioeconomic considerations, and in relation to utilization of nuclear energy and licensed materials in the public interest.” 10 CFR §20.1003 (2007). 166 US NRC NUREG/BR-0303, Guidance for Performance-Based Regulation (2002). http://www.nrc.gov/reading- rm/doc-collections/nuregs/brochures/br0303/br0303.pdf 167 NASA defines ASARP as “a fundamental principle of adequate safety. A determination that a system is ASARP entails weighing its safety performance against the sacrifice needed to further improve it. The system is ASARP if an incremental improvement in safety would require a disproportionate deterioration of system performance in other areas.” NASA/SP-2010-580, NASA System Safety Handbook, Volume 1, System Safety Framework and Concepts for Implementation; November 2011; p 5. http://ntrs.nasa.gov/archive/nasa/casi.ntrs.nasa.gov/20120003291_2012003429.pdf (accessed June 10, 2013). 168 NASA defines RISC as “a structured argument, supported by a body of evidence that provides a compelling, comprehensive and valid case that a system is or will be adequately safe for a given application in a given environment. This is accomplished by addressing each of the operational safety objectives that have been negotiated for the system, including articulation of a roadmap for the achievement of safety objectives that are applicable to later phases of the system life cycle. The term ‘risk-informed’ is used to emphasize that a determination of adequate safety is the result of a deliberative decision making process that necessarily entails an assessment of risks and tries to achieve a balance between the system’s safety performance and its performance in other areas.” Ibid at 13. 169 Ibid at xiii.

Chevron Richmond Refinery Regulatory Report May 2014

37

  1. 0 Key Features of an Effective Safety Case Regulatory Regime

Following the Macondo disaster, the National Commission on the Macondo Oil Spill and Offshore Drilling170 made a recommendation in its Report to the President171 for the US to “develop a proactive, risk-based performance approach specific to individual facilities, operations and environments, similar to the ‘safety case’ approach in North Sea.”172 Despite the major potential hazards that are present in both onshore and offshore oil and gas operations, the safety case regime has not been implemented in the US for either sector. The US has instead implemented for major hazards at onshore facilities a more activity- based approach, resulting in static regulations such as the PSM and RMP regulations that have not seen significant improvements173 since their inception, despite advances in technology and good industry practice. According to Dr. Hopkins and other renowned experts in the field, it is essential for an effective major accident prevention safety regime to take the form of a safety case, with adaptable goal-setting regulations that facilitate innovation and sustainability, and that drive industry to continuously improve and reduce risks to ALARP. To accomplish this, the regime must utilize sufficient numbers of highly competent personnel to effectively collect or promote industry use of process safety indicators174 and to provide knowledgeable oversight of industry operations. The CSB has determined that there are several key features of an effective major accident prevention regulatory approach such as the safety case regime:  Duty Holder Safety Responsibility, including a Written Case for Safety  Continuous Risk Reduction to ALARP  Adaptability and Continuous Improvement  Active Workforce Participation  Process Safety Indicators that Drive Performance  Regulatory Assessment, Verification, and Intervention; and an  Independent, Competent, Well-Funded Regulator As will be discussed in Section 5, California’s patchwork of regulations does not effectively implement these features, which are also illustrated in the figure below. Section 4 provides a detailed discussion of these features.

170 President Barack Obama established the National Commission on the BP Macondo Oil Spill and Offshore Drilling through Executive Order 13543 on May 21, 2010, to examine the facts and circumstances concerning the root causes of the Macondo explosion and fire. For more information see http://www.oilspillcommission.gov/page/about-commission (accessed June 17, 2013). 171 Available at http://www.oilspillcommission.gov/final-report (accessed June 17, 2013). 172 National Commission on the BP Macondo Oil Spill and Offshore Drilling. Report to the President: Deep Water, The Gulf Oil Disaster and the Future of Offshore Drilling; January 2011; 252. 173 OSHA did implement changes to 29 CFR §1910.106, creating a new Hazard Communication Standard. However, no changes have been made that impact the management of process safety under PSM. See https://www.osha.gov/dsg/hazcom/ (accessed August 6, 2013). 174 Process safety indicators are also referred to as performance indicators, metrics, key process indicators (KPI), performance measures, indicators, etc.

Chevron Richmond Refinery Regulatory Report May 2014

38

Figure 1. Safety Case Attributes. 4.1 Duty Holder Safety Responsibility, including a Written Case for Safety Under the safety case regulatory regime, each individual company is responsible for the safety of each hazardous facility. The onus is on the duty holder175 to prove to the regulator that the company’s processes, methodologies used to assess risks, and reasoning for choosing one control over another have substantially reduced risks to as low as reasonably practicable (ALARP), or equivalent. The duty holder

175 Duty holders are considered to be “those who create and/or have the greatest control of the risks associated with a particular activity. Those who create the risks at the workplace are responsible for controlling them.” HSE. Planning to do business in the UK offshore oil and gas industry? What you should know about health and safety; October 2011; p 2. http://www.hse.gov.uk/offshore/guidance/entrants.pdf (accessed June 5, 2013). These entities may include operators, contractors, and subcontractors. According to NOPSEMA, the idea is that those who create the risk must manage it. See http://www.nopsema.gov.au/safety/safety-case/what-is-a-safety-case/ (accessed July15, 2013).

Chevron Richmond Refinery Regulatory Report May 2014

39

is required to prepare a written case for safety176 (“safety case report”) that identifies the hazards and risks and describes how they will be reduced to ALARP. The HSE has noted that the safety case report “demonstrates that the duty holder has arrangements in place which, if implemented, are capable of achieving compliance with legal objectives set out in other [] regulations…[and] provides a comprehensive core document that can be used as a check by both the duty holder and HSE that the accepted risk control measures and the health and safety management systems are in place and operate as they should.”177 The HSE has also stated: [t]he principal matters to be demonstrated in a safety case are that: a) the management system is adequate to ensure compliance with statutory health and safety requirements; and for management of arrangements with contractors and sub-contractors, b) that adequate arrangements have been made for audit and for audit reporting, [and] c) that all hazards with the potential to cause a major accident have been identified, their risks evaluated, and measures have been, or will be, taken to control those risks to ensure that the relevant statutory provisions will be complied with.178 The safety case report must also demonstrate “how inherently safer design concepts have been applied in the design decisions taken.”179 This principle applies to all stages of the installation’s life cycle, and includes materials selection and managing corrosion in the design. It is also important to note that safety case reports are meant to be evergreen documents that reflect continuous improvement in risk reduction. For onshore operations in the UK, the duty holder is required to review the safety case report during the construction of a new facility, whenever new facts or technical knowledge about safety matters become known, or whenever the operator makes a change to the safety management system that could have significant impacts on the prevention of major accidents.180 The duty holder must revise the safety report to ensure that it “remains up to date and continues to provide an accurate representation of the major accident hazards…and the

176 The HSE defines “safety case” as “a document that gives confidence to both the duty holder and HSE that the duty holder has the ability and means to control major accident risks effectively. It provides an extra level of regulatory control on top of regulations such as the Offshore Installations (Prevention of Fire and Explosion, and Emergency Response) Regulations 1995 (PFEER) and the Offshore Installations and Wells (Design and Construction, etc) Regulations 1996 (DCR), justified by the major accident potential of the offshore activities within scope.” HSE. A Guide to the Offshore Installations (Safety Case) Regulations 2005: Guidance on Regulations; 2006; p 6. http://www.hse.gov.uk/pubns/priced/l30.pdf (accessed January 13, 2014). 177 Ibid at 6. 178 HSE. Assessment Principles for Offshore Safety Cases (APOSC); March 2006; p 7. http://www.hse.gov.uk/offshore/aposc190306.pdf (accessed August 6, 2013). 179 Ibid at 16. 180 COMAH Regulations, Part 3, Regulation 8 (1) (a)(b) and (c) (1999).

Chevron Richmond Refinery Regulatory Report May 2014

40

measures in place to control them.”181 According to HSE guidance on the offshore Safety Case Regulations, safety case reports are “intended to be living documents, kept up to date and revised as necessary during the operational life of the installation.”182 In order for the facility to begin operation or remain in operation, the regulator must “accept” 183 the facility’s safety case report; however, the regulator’s acceptance of a safety case does not license the facility or installation as “fit,”184 nor does it shift the duty of risk control and reduction away from the facility owner or operator and onto the regulator; rather, the duty of major accident prevention and risk reduction to ALARP remains with the duty holder throughout the life of the facility. Following the regulator’s acceptance of the safety case report, the duty holder must ensure that the installation is operated in conformity with the management system and other provisions described in the safety case.185 In the US, facilities commence operation before they are inspected or evaluated for complying with PSM or RMP regulations. In fact, the CSB has investigated incidents where the employer disputed that its process was covered by the PSM standard or RMP regulations. Regulators do not evaluate and approve PHAs or other hazard reviews and do not have the authority to license specific facilities for operation, based on the adequacy of their process safety programs. If an operating facility contains processes covered by the PSM standard, the facility must complete primarily activity-based regulatory requirements at least once every five years. The employer has no general duty to continually reduce risk. RMP- covered facilities must submit fairly high-level information exhibiting compliance with RMP requirements at least once every five years. While the regulator ensures the RMP has been filed and contains the required sections, there is no analysis of the effectiveness of controls identified in the RMP to mitigate hazards. 4.2 Continuous Risk Reduction to ALARP As discussed above, a majority of the safety case regimes implemented globally impose a duty on owners or operators of covered facilities on and offshore to reduce risks to ALARP or equivalent. The Center for Chemical Process Safety (CCPS) defines ALARP as “a risk reduction goal, where risk reduction efforts are continued until the incremental effort to further reduce risk becomes grossly disproportionate to the level of additional risk reduction.”186 This principle provides the regulator with the main foundation on

181 The Competent Authority. Revised guidance for operators of top tier COMAH establishments. Review and revision of COMAH safety reports. December 2009; p 5. http://www.hse.gov.uk/comah/report-review.pdf (accessed November 26, 2013). 182 HSE. A Guide to the Offshore Installations (Safety Case) Regulations 2005: Guidance on Regulations; 2006; p

  1. http://www.hse.gov.uk/pubns/priced/l30.pdf (accessed May 7, 2013).

183 “Acceptance requires satisfaction with the duty holder’s approach to identifying and meeting health and safety needs…HSE ‘accepts’ the validity of the described approach as being capable, if implemented as described, of achieving the necessary degree of risk control, but HSE does not confirm the outcomes of that approach.” Therefore, “HSE will accept a safety case or a revision…when duty holders demonstrate and describe specified matters to HSE’s satisfaction. Acceptance will be based on HSE’s judgment that the arrangements and measures described in the safety case taken as a whole are likely to achieve compliance if implemented as described. To give acceptance HSE does not need to be satisfied that compliance will be achieved.…” Ibid at 6. 184 TAF Powell, SPE, UK Health & Safety Executive. US Voluntary Semp Initiative: Holy Grail or Poisoned Chalice? Proceedings of the Offshore Technology Conference, Houston, Texas, May 8-9, 1996; p 8. 185 Ibid at 7. 186 Center for Chemical Process Safety (CCPS). Inherently Safer Chemical Processes – A Life Cycle Approach; 2nd ed., 2009; p 46.

Chevron Richmond Refinery Regulatory Report May 2014

41

which to accept or reject a safety case report. In essence, the regulator ultimately determines whether ALARP has been achieved through the authority to accept or reject the safety case report. An advantage of ALARP as opposed to a prescriptive or activity-based approach is that ALARP results in the continuous reduction of risk to keep up-to-date with advancing technology and industry best practices.187 Although two of the 14 PSM elements (PHA and mechanical integrity) contain performance-based or goal-setting requirements, 188 the PSM standard does not provide a specific risk reduction target such as ALARP. In reviewing the safety case report, the regulator may accept the application of relevant good practice as a sufficient demonstration of ALARP.189 As the HSE notes, “the measures in place to prevent or limit major accidents should be described in the safety report and be at least to ‘relevant good practice.’”190 According to Dr. Hopkins, the duty of ALARP “provides leverage for the regulator…[i]f an operator wishes to adopt a procedure or a standard that falls short of good or best practice, the regulator can reject it on the grounds that it does not reduce the risk as low as reasonably practicable.”191 As noted above, regulators such as HSE provide guidance on what is considered good practice, and publish documents containing good practice standards to assist operators with applying this concept. However, the duty holder must make the case for the standard or practice being utilized, and the regulator may determine that applying good practice alone is not sufficient to demonstrate that risks have been reduced to ALARP. In addition, if there is no directly applicable rule or standard, operators still have a duty to manage risk, and they therefore must maintain a reasonable level of risk awareness that goes beyond mere compliance.192 This raises a safety case regime above the compliance mentality of a more activity-based regime, such as PSM, and requires the duty-holder and the regulator to continuously ask whether there are other measures that would be effective in further reducing risks. The UK HSE provides ample guidance on determining what is considered to be ALARP, and many British courts have interpreted the concept as well. In the 1949 case Edwards v. National Coal Board, decided by the Court of Appeal, Judge Asquith wrote: ‘Reasonably practicable’ is a narrower term than ‘physically possible’ and seems to me to imply that a computation must be made by the

187 See http://www.hse.gov.uk/foi/internalops/hid_circs/permissioning/spc_perm_37/ (accessed December 9, 2013). 188 29 CFR §1910.119(e)(1) requires the employer to “identify, evaluate, and control the hazards involved in the process.” 29 CFR §1910.119(j)(5) states that “[t]he employer shall correct deficiencies in equipment that are outside acceptable limits (defined by the process safety information in paragraph (d) of this section) before further use or in a safe and timely manner when necessary means are taken to assure safe operation.” 189 HSE. Assessing compliance with the law in individual cases and the use of good practice; May 2003. http://www.hse.gov.uk/risk/theory/alarp2.htm (accessed June 12, 2013). 190HSE. Guidance on ALARP Decisions in COMAH. http://www.hse.gov.uk/foi/internalops/hid_circs/permissioning/spc_perm_37/ (accessed November 26, 2013). 191 Hopkins, Andrew. The Meaning of “Safety Case”; February 2013; p 6. 192 Hopkins, Andrew. The Meaning of “Safety Case”; February 2013; p 6.

Chevron Richmond Refinery Regulatory Report May 2014

42

owner, in which the quantum of risk is placed on one scale and the sacrifice involved in the measures necessary for averting the risk (whether in money, time or trouble) is placed in the other; and that if it be shown that there is a gross disproportion between them – the risk being insignificant in relation to the sacrifice – the defendants discharge the onus on them.193 While some critics in the US have argued that the determination of ALARP is strictly a quantitative risk assessment (QRA) calculation that is not sufficiently protective, the CSB has found that the HSE allows reliance upon qualitative assessments, QRA, and semi-quantitative risk assessments to determine ALARP.194 According to the HSE, essential considerations for determining whether a duty holder has reduced risks to ALARP include “the adoption of inherently safer designs…”195 and “[i]dentification of possible further measures that could be applied to lower the risk.”196 The HSE also notes that the guidance to COMAH Regulation 4 (General Duty) “describes the application of all measures necessary to reduce risk of a major accident to ALARP based on a hierarchical approach (inherent safety, prevention, control, mitigation).”197 In Norway, the PSA requires companies to “select technical, operational and organisational solutions that reduce the probability that harm, errors and hazard and accident situations occur.”198 PSA regulations require companies to choose the solutions that offer the best results, provided the costs are not significantly disproportionate to the risk reduction achieved.199 In Australia, the NOPSEMA enforces the Offshore Petroleum and Greenhouse Gas Storage Act 2006 and its regulations, which imposes a duty of care on the operator of a facility to “take all reasonably practicable steps” to ensure the facility is safe and all work and other activities are “carried out in a manner that is safe and

193 Edwards, [1949] 1 K.B. at 704. 194 Center for Chemical Process Safety (CCPS) guidance on risk assessment implies that as the predicted consequence of potential hazard scenarios increases, the level of analytical detail should also increase. Risk assessment approaches range in order of increasing analytical detail from qualitative, to semi-quantitative, to quantitative. Qualitative risk assessment is the simplest approach where judgments about consequence, likelihood, and the tolerability of risk are made on a subjective basis using the knowledge and experience of team members and may not be consistently applied within an organization. Semi-quantitative risk assessment is the second level of analytical detail, where organizations develop and provide to team members predetermined risk matrices and guidance for establishing numerical consequence and frequency levels. This approach is of greater value to team members as based upon their collective experience; the team typically has a sense of how frequently an event might occur and how great the potential consequence may be within the predetermined ranges. Layer of protection analysis (LOPA) is a semi-quantitative form of risk assessment, using order of magnitude categories for evaluating frequency, consequence, and adequacy of safeguards. Quantitative risk assessment involves the highest level of analytical detail and typically involves specialized expertise to perform. Complex models are commonly developed to evaluate frequency, consequence, and the effectiveness of safeguards in a quantitative risk assessment. Such approaches are typically standardized to minimize result variability within an organization and even between organizations in countries where a quantitative risk assessment is mandated by regulatory authorities. Center for Chemical Process Safety (CCPS). Guidelines for Developing Quantitative Safety Risk Criteria; August 2009. 195 HSE. The Safety Report Assessment Manual, Sections 8 to 15. p 30. http://www.hse.gov.uk/comah/sram/s8- 15.pdf (accessed October 30, 2013). 196 Ibid at 8. 197 Ibid at 8. 198 Regulations Relating to Health, Safety and the Environment in the Petroleum Activities and at Certain Onshore Facilities (The Framework Regulations). Section 11, Risk Reduction Principles. http://www.ptil.no/framework- hse/category403.html (accessed November 26, 2013). 199 Ibid.

Chevron Richmond Refinery Regulatory Report May 2014

43

without risk to the health of any person at or near the facility.”200 NOPSEMA explains that to achieve ALARP, the company “has to show, through reasoned and supported arguments, that there are no other practical measures that could reasonably be taken to reduce risks further.”201 In the US, the NRC has “gradually revised its original scheme, giving an increasing importance to the ‘economic and social factors’, in particular the involvement of all ‘stakeholders’ (authorities, management, staff, public) in the ALARA process.”202 For the regulator, the focus for whether ALARA has been achieved is on “processes, procedures, and judgments.”203 The duty holder must ensure that choices made to achieve ALARA are “fully documented together with the criteria which have brought to those choices. When the criteria are qualitative, it is more likely that subjective judgments play a large role, but those judgments must be equally recorded.”204 There is no corresponding duty to reduce risks to ALARP in the PSM standard or RMP program. Rather, these regulations require that facilities “control” identified hazards, with no further dialogue on how far the operator must go to control those hazards. Neither the facility nor the regulator is required to determine whether more could be done to control hazards or reduce risks to comply with these regulations, and this may result in the implementation of insufficient controls relating to a hazard. While OSHA and the EPA do rely on general duty standards when implementing the PSM standard and the RMP program, these duties do not drive onshore companies toward reducing the risks of their activities to ALARP, and instead are utilized as enforcement tools typically after an incident has occurred, meant to cover those activities not specifically regulated. These standards may also be used by OSHA or EPA to cite a company for not following a specific RAGAGEP for 2 of the 14 process safety elements - mechanical integrity and PSI. OSHA enforces section 5(a) of the Occupational Safety and Health Act (OSHAct), which states the following:

(a) Each employer – (1) shall furnish to each of his employees employment and a place of employment which are free from recognized hazards that are causing or are likely to cause death or serious physical harm to his employees; (2) shall comply with occupational safety and health standards promulgated under this act…205 Section 5(a)(1), also known as OSHA’s General Duty Clause, has been described as a “catch-all” provision meant to fill gaps in OSHA law for recognized unregulated hazards.206,207 In order for OSHA to

200 Offshore Petroleum and Greenhouse Storage Act 2006, Volume 3, Schedule 3, Clause 9. http://www.comlaw.gov.au/Details/C2012C00148/Html/Volume_3#_Toc315688204 (accessed October 30, 2013). 201 ALARP Guidance Note N-04-300-GN0166, Rev. 3 (Dec. 2011) available at http://www.nopsema.gov.au/assets/document/N-04300-GN0166-ALARP.pdf (accessed May 15, 2013). 202 Fasso, Alberto, and Rokni, S. Operational Radiation Protection in High Energy Physics Accelerators. Implementation of ALARA in Design and Operation of Accelerators. May 2009; p 6.

203 Ibid at 6. 204 Ibid at 6 and 7. 205 29 U.S.C. §654(a)(1) and (2) (2004). 206 Morrison, Kyle W. The General Duty Clause: What is it, how does OSHA use it and what should employers know? Safety + Health [Online]; May 1, 2011.

Chevron Richmond Refinery Regulatory Report May 2014

44

issue a General Duty Clause violation, the hazard must be recognized, the employer must have failed to keep the workplace free of the hazard to which his or her employees were exposed, a practical method must be available to correct the hazard, and the hazard must be causing or likely to cause death or serious injury.208 This duty would thus only apply if the absence or failure of one control in a series of controls makes an accident likely to occur (emphasis added). On the other hand, in a safety case regulatory regime, the regulator proactively reviews identified hazards and risk reduction strategies proposed by the operator to ensure that risks are being reduced to ALARP. The regulator may require the installation of an absent control if such a control is considered good industry practice, or if it goes further in reducing risks to ALARP. This is a key feature of the safety case approach in preventing major accidents. Under the CAA, the General Duty Clause requires owners and operators “to identify hazards which may result from such releases using appropriate hazard assessment techniques, to design and maintain a safe facility taking such steps as are necessary to prevent releases, and to minimize the consequences of accidental releases which do occur.”209 Similar to OSHA, the EPA can use its General Duty Clause enforcement authority to create legally binding requirements or enforce actions for hazards that have not been specifically regulated. The EPA can use this authority proactively (before an incident) or reactively (following an incident), and can enforce the clause where it finds the possibility of imminent and substantial endangerment.210 According to EPA guidance on the RMP program, because it is the owner or operator’s duty to “prevent accidents and ensure safety at [their] source…” this may require steps to be taken “beyond those specified in the risk management program rule.”211 While this principle appears to be similar to ALARP requirements of the safety case, in practice whether this is done is not subject to regulation or review. In addition, it is permissive in that it uses the word “may.” Nothing additional, such as ALARP, is required. This will be addressed below in more detail in the discussion of implementation of the EPA RMP program in California. 4.3 Adaptability and Continuous Improvement A key strength of the safety case regulatory regime is that it provides the regulator with the tools to drive continuous improvement among facilities and ensure risks have been reduced to ALARP or equivalent, rather than focusing on compliance with activity-based regulatory requirements. Although complying with good practice may achieve ALARP, the regulator also has the ability under this regime to require facilities to go above and beyond good practices and standards to achieve ALARP without requiring

http://www.nsc.org/safetyhealth/Pages/5%2011%20The%20General%20Duty%20Clause.aspx (accessed June 5, 2013). 207 According to the National Safety Council, General Duty Clause violations make up only about 1.5 percent of total violations issued annually by OSHA. Available at http://www.nsc.org/safetyhealth/Pages/5%2011%20The%20General%20Duty%20Clause.aspx (accessed June 5, 2013). 208 Ibid. 209 42 U.S.C. §7412(r)(1) (1990). 210 42 U.S.C. §7412(r)(9) (1990). 211 EPA Office of Solid Waste and Emergency Response. General Guidance on Risk Management Programs for Chemical Accident Prevention (40 CFR Part 68); March 2009; p 7-7. http://www.epa.gov/osweroe1/docs/chem/Toc_final.pdf (accessed May 14, 2013).

Chevron Richmond Refinery Regulatory Report May 2014

45

rulemaking. The Baker Panel212 noted in its 2007 report (“the Baker Report”) on BP and its process safety performance following the 2005 BP Texas City disaster that an effective process safety management system builds upon an “improvement cycle” that “should include, in practice, continuous reduction of process risk and improvements in safety performance according to some measurable criteria.”213 The Baker Panel defined “continuous improvement” as  improving controls for process hazards, including process safety knowledge and competence of workers;   improving process safety leadership of supervisors;   improving process engineering to identify and then design to remove or mitigate the effects of process hazards;   going beyond legal compliance to best practices to reduce risks;   going beyond mere compliance with internal standards, but learning from operating experiences, incident and near miss investigations, hazard studies, audits, and other assessments to improve those internal standards; and   identifying and implementing not only those external standards that must be observed, but also those that represent best practices that can lead to process safety excellence.214  An independent review conducted of the Australian offshore safety case regime in 2000 echoes the importance of continuous improvement in process safety management, stating that “critical to the successful implementation of a safety case regime is the achievement of a qualitative shift in industry and regulatory safety cultures from the minimalist compliance of the prescriptive regime to the philosophy of best practice and continuous improvement.”215 Recently, Lord Cullen addressed the importance of adaptability as well, when he spoke at the 2013 Oil & Gas UK Piper 25 offshore safety conference in Aberdeen, Scotland.216 In his keynote speech, Lord Cullen quoted the Maitland panel, which examined the UK offshore safety regime after the Macondo incident, noting that “safety cases should be living documents [emphasis added] central to the way facilities are operated, with contents widely understood.”217

212 In the aftermath of the BP Texas City Incident, BP followed the recommendation of the CSB and formed an independent panel known as the Baker Panel to conduct a thorough review of the company’s corporate safety culture, safety management systems, and corporate safety oversight at its US refineries. For a copy of their findings and recommendations see http://www.bp.com/liveassets/bp_internet/globalbp/globalbp_uk_english/SP/STAGING/local_assets/assets/pdfs/Bak er_panel_report.pdf (accessed August 13, 2013). 213 Baker, J. The Report of the BP U.S. Refineries Independent Safety Review Panel, 2007; p 166. 214 Baker, J. The Report of the BP U.S. Refineries Independent Safety Review Panel, 2007; p 166. 215 Department of Industry, Science and Resources; Offshore Safety and Security, Petroleum and Electricity Division. Australian Offshore Petroleum Safety Case Review: Report of the Independent Review Team. 2000; p 33. 216 In June 2013, Oil & Gas UK held a large offshore safety conference in Aberdeen, which marked the 25th anniversary of the Piper Alpha disaster. For more information see http://www.oilandgasuk.co.uk/events/Piper25.cfm?frmAlias=/Piper25/ (accessed September 16, 2013). 217 Finding Petroleum. Review: Lord Cullen – what have we learned from Piper Alpha? September 16, 2013. http://www.findingpetroleum.com/n/Review_Lord_Cullen_what_have_we_learned_from_Piper_Alpha/044b5113.as px (accessed September 16, 2013).

Chevron Richmond Refinery Regulatory Report May 2014

46

As changes to regulatory requirements necessitate an extensive, lengthy rulemaking process in the US,218 process safety-related regulations can remain static for decades, while industry standards (many of which are voluntary under the current US system), technologies, and improved procedures and practices continue to change and advance, and new chemicals come into production. In light of major accidents that have occurred, such as the BP Texas City explosion and fire which resulted in 15 fatalities, and the Motiva Enterprises sulfuric acid tank explosion, which fatally injured one worker and injured eight others, the CSB has made a number of key recommendations to OSHA and the EPA to revise the PSM and RMP regulations, respectively. However, agencies have failed to implement these recommendations and these regulations have remained static despite the important lessons learned from these incidents. In addition, the OSHA PSM standard’s Appendix A, which contains a list of toxic and reactive highly hazardous chemicals and the threshold quantity for each, was originally created using a number of older sources, including the EPA’s “Extremely Hazardous Substance List,” the 1982 Seveso Directive, the 1984 CIMAH regulations, and others. A number of these sources have been revised, updated, and amended throughout the years, while Appendix A has not. In fact, no chemicals have been added to either the PSM or the RMP programs since the rules were initially adopted in the 1990s, even as numerous serious process incidents have occurred involving chemicals that were not listed. The U.S. Government Accountability Office (GAO) published a 2012 report on OSHA’s standard setting abilities, and noted that between 1981 and 2010, OSHA took anywhere from 15 months to 19 years to develop and issue 58 significant safety and health standards (averaging seven years).219 According to the report, OSHA reasoned that it must evaluate technological and economic feasibility of a potential standard using data gathered by visiting worksites in industries that will be affected, on an industry-by- industry basis.220 This was described as “an enormous undertaking because, for example, it requires visits to multiple worksites.”221 In addition, Executive Order 12866222 requires that federal agencies, including OSHA, provide an assessment of the potential overall costs and benefits for significant rules to the Office of Management and Budget (OMB). OSHA will typically be required under the Small Business Regulatory Enforcement Fairness Act of 1996223 to initiate a panel process to receive and consider input

218 5 U.S.C. Chapter 5, sections 511-599, also known as the Administrative Procedure Act, or APA, requires that federal agencies seeking to promulgate a rule or regulation submit to a lengthy notice and comment rulemaking process that includes publishing the proposed rule making in the Federal Register; providing the public with at least 30 days to participate in the rulemaking process by submitting written comments or data, and then discussing the public comments and providing a rationale for accepting or rejecting them. The OSHAct Section 6(b) specifies the procedures OSHA must use to promulgate, modify, or revoke its standards (29 U.S.C. §655(b)). These procedures include publishing the proposed rule in the Federal Register, providing interested persons an opportunity comment, and holding a public hearing upon request. 219 GAO. Workplace Safety and Health: Multiple Challenges Lengthen OSHA’s Standard Setting; April 19, 2012; p

  1. Available at http://gao.gov/assets/600/590210.pdf (accessed June 12, 2013).

220 Ibid at 6. The Supreme Court has held that the OSHAct requires that standards be both technologically and economically feasible. Am. Textile Mfrs. Inst. V. Donovan, 452 U.S. 490, 513 n. 31 (1981). Also see United Steelworkers v. Marshall, 647 F. 2d 1189, 1301 (D.C. Cir. 1980), quoted in AFL-CIO v. OSHA, 955 F. 2d 962, 980 (11th Cir. 1992). Assessing feasibility on an industry-by-industry basis requires that the agency research all applications of the hazard being regulated, as well as the expected cost for mitigating exposure to that hazard, in every industry. 221 Ibid at 6. 222 Exec. Order No. 12866, 48 Fed. Reg. 190 (September 30, 1993). http://www.whitehouse.gov/sites/default/files/omb/inforeg/eo12866/eo12866_10041993.pdf (accessed June 12, 2013). 223 5 U.S.C. §609(b), (d) (1996).

Chevron Richmond Refinery Regulatory Report May 2014

47

from representatives of affected small businesses, which could take eight months or more.224 Only OSHA, the EPA, and the Consumer Financial Protection Bureau are subject to this requirement.225 Finally, the OSHAct directs courts to review OSHA’s standards using a more stringent legal standard than the Administrative Procedure Act’s (APA’s) “arbitrary and capricious” test226 when reviewing OSHA’s standards;227 an OSHA standard may only be upheld if it is supported by “substantial evidence in the record considered as a whole.”228 According to the GAO report, OSHA officials claim this more stringent standard (known as the “substantial evidence” standard) requires a higher level of scrutiny by the courts and as a result, OSHA staff must conduct a large volume of detailed research in order to understand all industrial processes involved in the hazard being regulated, and to ensure that a given hazard control would be feasible for each process.229 The GAO also found that although OSHA has the ability to address urgent hazards by issuing emergency temporary standards, the agency has not used this authority since 1983 because of the difficult hurdles the agency faces in presenting the evidence necessary to meet the statutory requirements.230 In summary, all of these extensive rulemaking constraints have resulted in OSHA’s inability to undertake many standard revisions or improvements. In Spring 2013, OSHA announced its new regulatory agenda, which stated that one of the things OSHA plans to consider is revising the PSM standard to “address gaps in safety coverage.”231 Potential revisions include “expanding coverage and requirements for reactivity hazards,” which the CSB addressed in its 2002 report entitled “Improving Reactive Hazard Management,”232 and “expanding the scope of

224 GAO. Workplace Safety and Health: Multiple Challenges Lengthen OSHA’s Standard Setting; April 19, 2012; p

  1. Available at http://gao.gov/assets/600/590210.pdf (accessed June 12, 2013).

225 5 U.S.C. §609(d) (1996). 226 Pursuant to the APA, agency decisions may be set aside only if “arbitrary, capricious, an abuse of discretion, or otherwise not in accordance with law.” 5 U.S.C. §706(2)(A). There is abundant case law that discusses this standard. Courts have held that a court “may reverse under the arbitrary and capricious standard only if the agency has relied on factors that Congress has not intended it to consider, entirely failed to consider an important aspect of the problem, offered an explanation for its decision that runs counter to the evidence before the agency, or is so implausible that it could not be ascribed to a difference in view or the product of agency expertise. See Greater Yellowstone Coalition v. Lewis, 638 F. 3d 1143, 1148 (9th Cir. 2010) (as amended) (relaying on The Lands Council v. McNair, 537 F.3d 981, 987 (9th Cir. 2008) (en banc), overruled on other grounds by Winter v. Natural Res. Def. Council, 555 U.S. 7 (2008)). 227 GAO. Workplace Safety and Health: Multiple Challenges Lengthen OSHA’s Standard Setting; April 19, 2012; p

  1. http://gao.gov/assets/600/590210.pdf (accessed June 12, 2013).

228 29 U.S.C. §655(f). 229 GAO. Workplace Safety and Health: Multiple Challenges Lengthen OSHA’s Standard Setting; April 19, 2012; p

  1. http://gao.gov/assets/600/590210.pdf (accessed June 12, 2013).

230 OSHA must demonstrate that workers are exposed to grave danger and establish that an emergency temporary standard is necessary to protect workers from that grave danger. OSHA is also required to replace an emergency temporary standard with a permanent standard within six months using the requirements laid out in OSHAct 6(b). Ibid at 11. 231 See OSHA’s rulemaking abstract at http://www.reginfo.gov/public/do/eAgendaViewRule?pubId=201304&RIN=1218-AC82 (accessed September 17, 2013). 232 In this report, the CSB recommended to OSHA that it amend the PSM standard “to achieve more comprehensive control of reactive hazards that could have catastrophic consequences.” The report is available at http://www.csb.gov/assets/1/19/ReactiveHazardInvestigationReport.pdf (accessed September 17, 2013). The recommendations start on page 89 of the report.

Chevron Richmond Refinery Regulatory Report May 2014

48

paragraph (j) to cover the mechanical integrity of any safety-critical equipment.…”233 However, OSHA has proposed changes to the PSM standard before, with no action ultimately being taken. On April 27, 1998, OSHA announced that it was considering issuing an Advance Notice of Proposed Rulemaking234 (ANPRM) “to address issues related to reactive chemicals raised by the explosion of a chemical plant in Lodi, New Jersey in 1995.”235,236 On May 14, 2001, OSHA clarified its intent to publish an ANPRM “to address the need to add reactive chemicals that are not currently covered by PSM…”237 On December 3, 2001, however, the entry on reactives was withdrawn from the rulemaking agenda.238 Following the devastating ammonium nitrate explosion on April 17, 2013, in West, Texas, which resulted in at least 14 fatalities and mass destruction in the town of West, CSB Chairperson Moure-Eraso urged both OSHA and the EPA to expand their standards to include reactive chemicals and hazards such as ammonium nitrate.239 On July 25, 2013, the CSB held a public meeting in Washington, DC to discuss the status of key open recommendations the CSB has made to OSHA over the last decade to revise its PSM standard and create a new combustible dust standard. These recommendations, which include revising the PSM standard to require MOC reviews for organizational changes such as mergers and acquisitions that may impact process safety, and ensuring PSM coverage for atmospheric storage tanks that could be involved in a potential catastrophic release, have stemmed from major CSB investigations including its BP Texas City, Motiva, ConAgra, Kleen, Imperial Sugar, and Hoeganaes investigations, as well as its Combustible Dust Study.240 OSHA’s failure to implement these recommendations, which can be attributed to its lack of rulemaking activities over the last decade, led the CSB to reclassify seven key open recommendations as “Open-Unacceptable.” The CSB also adopted the OSHA Combustible Dust Standard recommendation as a CSB “Most Wanted Chemical Safety Improvement.” OSHA formally responded and cited to the GAO report discussed above, noting that on average, it takes OSHA seven years to issue a standard, a process

233 See OSHA’s rulemaking abstract at http://www.reginfo.gov/public/do/eAgendaViewRule?pubId=201304&RIN=1218-AC82 (accessed September 17, 2013). 234 Most federal agencies develop rules through “informal rulemaking.” Under the Administrative Procedure Act, or APA, informal rulemaking requires a publication of a “Notice of Proposed Rulemaking” (NPRM) in the Federal Register; opportunity for public participation by submission of written comments; consideration by the agency of the public comments and other relevant material; and publication of a final rule not less than 30 days before its effective date, with a statement explaining the purpose of the rule. Under the APA, an agency may publish an Advance Notice of Proposed Rulemaking (ANPRM) when the agency wants to test out a proposal or solicit ideas before it drafts its NPRM. For more information see http://www.foreffectivegov.org/node/226 (accessed September 17, 2013). 235 See https://www.osha.gov/pls/oshaweb/owadisp.show_document?p_table=FEDERAL_REGISTER&p_id=13792 (accessed September 17, 2013). 236 This incident took place on Friday, April 21, 1995, at a chemical facility occupied by Napp Technologies. The explosion and fire resulted in five fatalities. 237 See https://www.osha.gov/pls/oshaweb/owadisp.show_document?p_table=FEDERAL_REGISTER&p_id=16776 (accessed September 17, 2013). 238 See https://www.osha.gov/pls/oshaweb/owadisp.show_document?p_table=FEDERAL_REGISTER&p_id=16946 (accessed September 17, 2013). 239 In a 2002 study entitled Improving Reactive Hazard Management, the CSB made recommendations to OSHA and the EPA to expand their regulations to include reactive chemicals and hazards. To date, neither agency has acted on the recommendations. See http://www.csb.gov/in-safety-message-csb-chairperson-rafael-moure-eraso- calls-for-regulatory-coverage-of-reactive-chemicals-following-the-west-fertilizer-explosion-and-fire-/ (accessed September 23, 2013). 240 For more information on this meeting, see http://www.csb.gov/events/csb-public-meeting-to-vote-on-key-safety- recommendations-and-initiate-most-wanted-program/ (accessed July 29, 2013).

Chevron Richmond Refinery Regulatory Report May 2014

49

that is only getting longer. Hence, OSHA reserves rulemaking for “widespread and serious hazards.” Needed petroleum refinery and chemical process safety improvements may never fall under this category. OSHA noted at the meeting that it would be utilizing a Request for Information241 (RFI) to aid in the revision of its PSM standard, aimed at addressing a number of issues that have developed in the 21 years since the PSM standard was promulgated in 1992. On December 9, 2013, OSHA published its RFI in the Federal Register.242 The RFI requests comment on potential revisions to OSHA’s PSM standard, among other regulations. The RFI identifies seventeen topics for potential rulemaking and enforcement changes, including clarifying the PSM exemption for atmospheric storage tanks and expanding PSM coverage and requirements for reactive hazards. The RFI also cites a number of CSB investigation reports and recommendations, including the CSB Reactive Hazard Study entitled Improving Reactive Hazard Management, the BP Texas City Investigation Report, and the Donaldson Enterprises, Inc., Investigation Report.243 Although the RFI is an important opportunity to enhance the dialogue on implementation of the safety case regulatory approach to enhance process safety management and risk reduction in the US, it does not specifically mention the safety case approach.244 On January 3, 2014, OSHA released a response to Section 6(a) of Executive Order 13650,245 which tasked the Chemical Facility Safety and Security Working Group, created by the Order and consisting of federal agencies such as OSHA, the EPA, and PHMSA,246 with considering options to improve chemical safety regulation. The document provides separate responses from each member agency of the group, and notes that the group is seeking public input on potential areas where standards could be improved. According to the document, three agencies – OSHA, the EPA, and PHMSA – have all included “[e]valuating the implementation of best practices and lessons learned such as the ‘safety case’ regulatory model to reduce

241 An RFI is a tool used by a federal agency to help develop a proposed rule. Federal agencies generally use RFIs when they want public input on whether a new rule or changes to an existing rule are needed, and comments on what course the agency should take should it decide to move forward. More information available at http://www.dol.gov/regulations/participate.htm (accessed July 29, 2013). 242 78 Fed. Reg. 73756 (2013). 243 A full copy of the OSHA RFI is available at https://www.federalregister.gov/articles/2013/12/09/2013- 29197/process-safety-management-and-prevention-of-major-chemical-accidents (accessed January 7, 2014). 244 OSHA has released on its website a separate document responding to Executive Order 13650, Section 6(a) – Solicitation of Public Input on Options for Policy, Regulation, and Standards Modernization. OSHA states in this document that it is seeking public input on potential areas where it could improve its standards, and includes “[e]valuating the implementation of best practices and lessons learned such as the ‘safety case’ regulatory model to reduce risk in complex industrial processes” as an area to consider. https://www.osha.gov/chemicalexecutiveorder/Section_6ai_Options_List.html (accessed January 7, 2014). However, the safety case regulatory model is not mentioned in the RFI that was released for public comment. 245 This document is available at https://www.osha.gov/chemicalexecutiveorder/Section_6ai_Options_List.html (accessed January 7, 2014). 246 The Chemical Facility Safety and Security Working Group is co-chaired by the Secretary of Homeland Security, the Administrator of the EPA, and the Secretary of Labor. The Working Group must consist of the head or a designated representative of the Department of Justice, Department of Agriculture, and the Department of Transportation. The Working Group must also consult with representatives from the Council on Environmental Quality; the National Security Staff; the Domestic Policy Council; the Office of Science and Technology Policy; the Office of Management and Budget; the White House Office of Cabinet Affairs; and other agencies designated by the President. http://www.whitehouse.gov/the-press-office/2013/08/01/executive-order-improving-chemical-facility- safety-and-security (accessed January 13, 2014).

Chevron Richmond Refinery Regulatory Report May 2014

50

risk in complex industrial processes” in a preliminary list of options to consider for improving chemical facility and safety.247 OSHA’s ability to adapt to process safety-related new or revised codes, standards, technology, and lessons learned is mainly limited to RAGAGEP requirements, which OSHA included in the mechanical integrity and PSI elements of its PSM standard in part to “provide flexibility for the employer to choose the frequency which would provide the best assurance of equipment integrity.”248 OSHA meant for RAGAGEP to include “both appropriate internal standards and applicable codes and standards.…”249 However, the concept of RAGAGEP only applies to 2 of the 14 PSM standard elements (mechanical integrity and PSI),250 only addresses equipment and mechanical integrity, and is usually utilized by OSHA as a mechanism to issue citations to companies post-incident. In addition, OSHA has had difficulty enforcing RAGAGEP citations. In a recent OSHA Review Commission proceeding, Secretary of Labor v BP Products North America, Inc., & BP-Husky Refining, LLC,251 and United Steelworkers Local 1-346, the Administrative Law Judge (ALJ) vacated OSHA RAGAGEP citations issued to BP for violations of 29 CFR §1910.119(d)(3)(ii)252 for failure to comply with a specific RAGAGEP, holding that OSHA impermissibly adopted a specific RAGAGEP, thereby diminishing the performance aspect of the RAGAGEP requirements contained within the OSHA PSM standard. The ALJ concluded that by citing to only one specific RAGAGEP, OSHA impermissibly adopted a prescriptive standard; in the ALJ’s view, OSHA should have acknowledged other possible RAGAGEPs for BP to comply with, including BP’s own internal standards. If upheld, this ruling may limit OSHA’s ability to utilize RAGAGEP as a means of requiring companies to implement industry good practices in the future.253 The cumbersome rulemaking process and lack of flexibility that has resulted in stagnant and static OSHA standards can be contrasted with the structure of the safety case regulatory regime, which facilitates adaptability and enables the regulator to improve industry safety performance and practices without requiring a major rule change. The safety case essentially provides the regulator with the tools to recognize more rigorous standards and practices that exist and drive a company to implement those practices to further reduce risks, as well as work with industry to improve existing standards and practices if necessary. It also enables companies to implement new, more efficient or safer technologies that do not necessarily meet strict prescriptive regulations, but that drive risk reduction. This adaptability is illustrated by the HSE’s recommendations following the 2004 Buncefield incident. On December 11, 2005, a number of explosions occurred at Buncefield Oil Storage Depot in Hemel Hemptstead, Hertfordshire, England following the overfilling of a gasoline tank. Over 40 people were injured and there was significant offsite damage to homes and businesses. An independently chaired Major Incident Investigation Board led by Lord Newton of Braintree was set up to investigate the incident. Between 2006 and 2008 the Board issued a number of reports and recommendations. In the

247 Ibid. 248 57 Fed. Reg. 6390-6391 (1992). 249 Ibid at 6390-6391. 250 29 CFR §§1910.119(d)(3)(ii) and (j)(4)(ii) and (iii). 251 BP Products North America, Inc. operates a refinery in Oregon, Ohio. BP-Husky is a joint venture with a business interest in the refinery. 252 29 CFR 1910.119(d)(3)(ii) requires the employer to document that equipment complies with RAGAGEP. 253The Occupational Safety and Health Review Commission is scheduled to review the decision.

Chevron Richmond Refinery Regulatory Report May 2014

51

report issued in March 2007 entitled “Recommendations on the design and operation of fuel storage sites,” the Board highlighted the adaptability of the existing regulatory regime by noting that the recommendations to improve standards and revise guidance should not require actual changes to the law, because the existing legal framework was “sufficient to ensure that necessary improvements are put in place.”254 The Board followed by making its first recommendation of the report to the COMAH CA and operators of Buncefield-type sites to develop and agree on a methodology to determine safety integrity level requirements for overfill prevention systems, which takes account of, among other things, nearby resources or populations.255 The Board also recommended that the sector “develop guidance to incorporate the latest knowledge on preventing loss of primary containment and on inhibiting escalation if loss occurs.”256 Another key recommendation was made to the CA to “ensure that safety reports submitted under the COMAH Regulations contain information to demonstrate that good practice in human and organisational design, operation, maintenance and testing is implemented as rigorously as for control and environmental protection engineering systems.”257 Finally, the Board recommended in this report that the “sector agree with the Competent Authority on a system of leading258 and lagging259 performance indicators for process safety performance…” based on HSE’s guidance on Developing process safety indicators.260 Spurred by recommendations made surrounding the Buncefield incident, the BP Texas City incident, and the BP Grangemouth incident,261 the COMAH CA developed an Operational Delivery Guide entitled “COMAH Competent Authority Workstream 2e: Process safety performance indicators,”262 which was “designed to continue the promotion and development of site level process safety performance indicators (PSPIs) as part of the monitoring arrangements for an effective process safety management system at major hazard sites.”263 The guide states that by the end of March 2013 all “Buncefield-type” sites would “have effective monitoring of process safety performance in place and that site specific leading and lagging performance indicators have been developed…”264 and that by the end of 2015 “all major hazard establishments and duty holders will measure their performance on the control of major hazard risks by way of key leading and lagging performance indicators.”265 It lays out in detail a six-step process for implementing a process safety measurement system; how inspectors will assess a duty holder’s

254 Buncefield Major Incident Investigation Board. Recommendations on the design and operation of fuel storage sites; March 2007; p 3. http://www.buncefieldinvestigation.gov.uk/reports/recommendations.pdf (accessed May 21, 2013). 255 Ibid at 8. 256 Ibid at 15. 257 Ibid at 19. 258 Leading indicators are measurements that predict future performance to ensure that safety protection layers and operating discipline are being maintained, including unsafe behaviors or insufficient operating discipline equipment selection, engineering design, specification of inspection frequency, and technique. See Center for Chemical Process Safety (CCPS), Guidelines for Process Safety Metrics; October 2009; p 20. 259 Lagging indicators are facts about previous events, such as process safety incidents, that meet the threshold of severity and should be reported as part of the process safety metric. Ibid at 20. 260 Ibid at 13. 261 Between May 29 and June 10, 2000, three incidents occurred at the BP Grangemouth Petrochemical Complex in Scotland, which is one of the largest of the 950 COMAH sites in the UK. 262 Available at http://www.hse.gov.uk/comah/guidance/process-safety-performance-indicators.pdf (accessed May 21, 2013). 263 COMAH Competent Authority, “Workstream 2e: Process safety performance indicators,” 2012; page 3. 264 COMAH Competent Authority, “Workstream 2e: Process safety performance indicators,” 2012; page 6. 265 Ibid at 3.

Chevron Richmond Refinery Regulatory Report May 2014

52

performance; and adds that full implementation of this program could take between 18 months and two and a half years from when the initial introduction takes place – all without requiring any fundamental changes to the COMAH regulations themselves. The COMAH CA Investigation Team noted in its publication summarizing the conclusions of the Buncefield investigation that following the incident, the CA, industry, and trade unions worked together to “drive forward high standards at fuel storage sites…[which] has resulted in agreement on improved standards of safety and environmental protection for all UK sites storing large volumes of gasoline and to systematically upgrade sites to meet these standards….”266 In another example following the Buncefield incident, the Board recommended significantly higher standards than were generally in place in the sector. For example, the Board recommended that fuel storage tanks be fitted with automatic overfill protection equipment that would cut off supply if an overfill event occurs, rather than continuing to rely on operators to interrupt flow manually in the case of an event. In response, the UK Petroleum Industry Association and the Tank Storage Association adopted the recommendation, and the British government announced that it would require all sites to move to fully automatic shutdown systems on tanks storing gasoline. The Process Safety Leadership Group (PSLG) was formed to help develop the details of the new rule, and to “meet the need for an effective framework for interaction between industry, trade unions and the COMAH Competent Authority (CA).…”267 As will be discussed in the next section, workforce involvement is a key element of an effective safety case regulatory regime. In 2009, HSE published the PSLG’s work in a document entitled Safety and Environmental Standards for Fuel Storage Sites. The document lays out precisely which tanks must utilize automatic overfill protection equipment, and also allows for duty holders to demonstrate technical reasons as to why automatic overfill protection would not be appropriate by “prepar[ing] a robust demonstration that alternative measures are capable of achieving an equivalent ALARP outcome to an overfill protection system that is automatic…”268 This document in essence was developed as an industry good practice, and compliance with its requirements would likely ensure that the duty holder is complying with the law and reducing risks to ALARP.269 This can be contrasted with an even larger release of gasoline and a subsequent explosion that occurred in the 2009 tank overfill at the Caribbean Petroleum Corporation near San Juan, Puerto Rico. This incident severely damaged surrounding buildings and impacted moving vehicles. However, the incident has not resulted in any re-evaluation of safety rules by the EPA or OSHA, despite the fact that tank terminals largely fall outside the PSM and RMP program regulations, (let alone the more rigorous requirements of a major hazard safety case regulatory regime, as practiced in the UK). These post-Buncefield examples highlight one of the most important attributes of the safety case regulatory approach: it is a regulatory framework that implements a balance of goal-setting and prescriptive elements which enable the regulator to drive facilities to continuously improve practices

266 The Competent Authority. Buncefield: Why did it happen? The underlying causes of the explosion and fire at the Buncefield oil storage depot, Hemel Hempstead, Hertfordshire on 11 December 2005; February 2011; p 3. http://www.hse.gov.uk/comah/buncefield/buncefield-report.pdf (accessed May 21, 2013). 267 Process Safety Leadership Group. Safety and environmental standards for fuel storage sites; London, 2009; p 7. http://www.hse.gov.uk/comah/buncefield/fuel-storage-sites.pdf (accessed August 1, 2013). 268 Ibid at 29. 269 For a detailed discussion of rule-compliance and the safety case, see Hopkins, Andrew. Risk-management and rule-compliance: Decision-making in hazardous industries; Safety Science 49 (1011) 110-120.

Chevron Richmond Refinery Regulatory Report May 2014

53

aimed at reducing risks to ALARP, without having to adhere to the extensive and time-consuming rulemaking requirements that exist in the US. This flexibility and adaptability encourages facilities to focus on improving practices and technology rather than on completing activity-based requirements, which can have the effect of stifling innovation and technological advancement. Critics argue that because there have been significant industry problems with the maintenance of safety critical equipment and aging equipment in the UK, 270 the safety case regime is not operating effectively. Regulators and commissions in the UK have found degradation of pipes, valves, and other equipment at many facilities due to company deferral of maintenance, insufficient testing of safety-critical elements, and a continuing industry culture of responding to disasters. However, the HSE has worked to make improvements to these areas. In 2010, the UK HSE initiated Key Programme 4 to address the issue of aging equipment offshore and the operation of installations beyond their design life.271 The same year, the HSE published a report intended to inform industry and aid in the prevention of major accidents entitled Managing Ageing Plant: A Summary Guide,272 which provides an overview of ageing plant mechanisms and their management. This document presents analysis and findings for loss of containment incidents to demonstrate how aging plant equipment may be a factor. The HSE has been able to take this type of programmatic proactive approach in the UK thanks to the safety case regime’s adaptive nature, which is lacking in the US both on and offshore. This is positive evidence of a competent and effective regulator with the tools under the safety case regime to identify and proactively address industry gaps in safety performance. 4.4 Active Workforce Participation As the CSB noted in its Interim Report on the Chevron incident, workforce participation is a key element of process safety and effective major accident prevention. In one of its publications, the Center for Chemical Process Safety (CCPS) lists workforce involvement as one of 20 essential management components necessary to reduce process safety risks and prevent chemical accidents.273 According to CCPS, …workers are potentially the most knowledgeable people with respect to the day-to-day details of operating the process and maintaining the equipment and facilities and may be the sole source for some types of knowledge gained through their unique experiences. Workforce involvement provides management a mechanism for tapping into this valuable expertise.274 This CCPS publication discusses general areas of workforce involvement in risk assessments, inspections, audits, and performance reviews, and notes that participation leads to empowerment, management

270 The HSE published a report to communicate the results and conclusions of the Asset Integrity Key Programme carried out between 2004 and 2007 by the Health and Safety Executive’s Offshore Division. See http://www.hse.gov.uk/offshore/kp3.pdf, (accessed August 28, 2013). 271 The UK launches Key Programmes to address poor performance in specific areas. Access the report entitled Key Programme 4 (KP$): Ageing and life extension at http://www.hse.gov.uk/offshore/ageing/kp4-interim-report.pdf (accessed November 1, 2013). 272 See http://www.hse.gov.uk/research/rrpdf/rr823-summary-guide.pdf (accessed November, 1, 2013). 273 CCPS. Guidelines for Risk Based Process Safety; March 2007; p liv. 274 Ibid at 124.

Chevron Richmond Refinery Regulatory Report May 2014

54

responsiveness, and process safety performance improvement. 275 The OSHA PSM standard requires employers to consult with employees and their representatives on the conduct and development of PHAs and on the development of the 13 remaining PSM elements, and to develop a written plan of action regarding the implementation of the employee participation required under this section.276 During facility inspections, OSHA inspectors must request and evaluate these written plans of action regarding the implementation of employee participation as well as interview employees and their representatives to verify that the employer is satisfying the requirements.277 In previous investigation reports, the CSB has identified that workers and their representatives play a very important role in major incident prevention. For example, as will be discussed in the next section on performance indicators, the CSB recommended in its BP Texas City Final Investigation Report that BP and the United Steelworkers Union (USW) establish a joint program to report incidents and near misses, and to ensure that recommendations made during investigations were implemented. The CSB also recommended that API and the USW work together to develop a safety standard addressing leading and lagging process safety indicators.278 However, representatives from the USW have stated to the CSB that it is a constant struggle for workers and their representatives to have a voice or play a role in the management of safety in US petroleum refineries. The law in the UK also requires employers to consult with their employees or their safety representatives on health and safety matters. The Safety Representatives and Safety Committees Regulations 1977 and the Health and Safety (Consultation with Employees) Regulations 1996 set out the legal framework for such consultation and worker involvement at both unionized and non-unionized onshore facilities.279 However, these regulations go further than the OSHA PSM standard in that they provide for the election of safety representatives by the workers to serve many health and safety-related functions, including investigating complaints and accidents and carrying out inspections. In his keynote speech at the Oil and Gas UK Piper 25 conference, Lord Cullen stated that the safety representative positions have “important functions, such as the power to carry out investigations and reporting safety concerns to management, without fear of recrimination,” noting that they “help[] reinforce the principle that each employee is responsible for his own safety.”280 The regulations also require employers to establish a safety committee when one is requested by at least two health and safety representatives. The 1996 regulations require employers to consult with employees not represented by safety representatives under the 1977

275 Ibid at 125. 276 29 CFR §1910.119(c) (2012). 277 See OSHA CPL 02-02-045. Process Safety Management of Highly Hazardous Chemicals – Compliance Guidelines and Enforcement Procedures. September 13, 1994. https://www.osha.gov/pls/oshaweb/owadisp.show_document?p_id=1558&p_table=directives (accessed September 6, 2013). 278 Process safety indicators are also referred to as safety performance indicators, metrics, key process indicators, performance measures, indicators, etc… 279 The 1977 regulations apply to workplaces where the employer recognizes trade unions and trade unions are recognized for collective bargaining purposes. Regulations available at http://www.legislation.gov.uk/uksi/1977/500/contents/made (accessed September 4, 2013). The 1996 regulations apply to workplaces where employees are not in a trade union and/or the employer does not recognize the trade union, or the trade union does not represent those employees not in the trade union. Regulations available at http://www.legislation.gov.uk/uksi/1996/1513/contents/made (accessed September 4, 2013). 280 Finding Petroleum. Review: Lord Cullen – what have we learned from Piper Alpha? September 16, 2013. http://www.findingpetroleum.com/n/Review_Lord_Cullen_what_have_we_learned_from_Piper_Alpha/044b5113.as px (accessed September 16, 2013).

Chevron Richmond Refinery Regulatory Report May 2014

55

Regulations on a number of health and safety-related matters, such as the introduction of any measure which may substantially affect their health and safety at work, the planning and organization of health and safety training, and the health and safety consequences of introducing new technology.281 The law in the UK protects employees from being penalized for taking part in health and safety consultation.282 The UK’s existing regulations and policies regarding worker involvement offshore were developed and strengthened as a result of the Piper Alpha incident. In the Piper Alpha Report, Lord Cullen emphasized the importance of workforce involvement in safe operations, and noted that a safety committee system is “the most visible instrument for the involvement of the workforce in safety.”283 He concluded by recommending that “the regulatory body, operators and contractors should support and encourage the involvement of the offshore workforce in safety.”284 The HSE developed guidance in response to Lord Cullen’s recommendations entitled Play your part! How offshore workers can help improve health and safety, intended to encourage workforce participation offshore.285 The most current version of this guidance document, which was prepared by the Workforce Involvement Group,286 located within the HSE’s Offshore Industry Advisory Committee,287 utilizes good practice and examples of successful workforce involvement in improving health and safety with the goal of assisting operators, contractors, safety representatives, and others in effectively utilizing workforce involvement in their workplaces. It encourages companies to facilitate workforce involvement by providing information, improving communication at all levels, good training, and ensuring that all workers are represented in the decisions that affect them.288 The Piper Alpha incident also resulted in the swift development of the SI971 Offshore Regulations (Safety Representatives and Safety Committees) Regulations 1989 (“the SI971 Regulations”), which provide for the nomination and election of safety representatives and require offshore installations to establish safety committees.289290 The HSE has published a guidance document entitled A guide to the

281 See HSE. Consulting employees on health and safety: A brief guide to the law. 2013. http://www.hse.gov.uk/pubns/indg232.pdf (accessed September 4, 2013). 282 See Employment Rights Act 1996. Section 44. Health and safety cases. http://www.legislation.gov.uk/ukpga/1996/18/section/44 (accessed September 4, 2013). 283 Department of Energy. The Public Inquiry into the Piper Alpha Disaster; Presented to Parliament by the Secretary of State for Energy by Command of her Majesty; November 1990; p 301. 284 Department of Energy. The Public Inquiry into the Piper Alpha Disaster; Presented to Parliament by the Secretary of State for Energy by Command of her Majesty; November 1990; p 392. 285 See HSE. Play your part! How offshore workers can help improve health and safety; 2013. http://www.hse.gov.uk/pubns/indg421.pdf (accessed June 17, 2013). 286 The Workforce Involvement Group’s mission is to improve safety “by stimulating lateral learning and best practice across the offshore industry through involvement of the whole workforce.” It looks at ways to increase worker involvement in health and safety matters offshore and is chaired by HSE. For more information see http://www.hse.gov.uk/aboutus/meetings/iacs/oiac/wig.htm (accessed June 17, 2013). 287 The Offshore Industry Advisory Committee is a tripartite committee that includes members representing employers, employees, unions, trade associations and other government departments. It is focused solely on the offshore sector. More information is available at http://www.hse.gov.uk/aboutus/meetings/iacs/oiac/information.htm (accessed June 17, 2013). 288 HSE. Play your part! How offshore workers can help improve health and safety; 2013; p 4. http://www.hse.gov.uk/pubns/indg421.pdf (accessed June 17, 2013). 289 Under Regulation 16, safety representatives are responsible for investigating potential hazards and incidents, examining causes of accidents, investigating complaints by any member of his or her constituency relating to occupational health and safety, representing members of the workforce in consultations on the offshore installation with inspectors, and consulting constituency members on any matters arising out of the Regulation. Under Regulation 17, a safety representative may inspect any part of the offshore installation or its equipment either on a

Chevron Richmond Refinery Regulatory Report May 2014

56

Offshore Installations (Safety Representatives and Safety Committees) Regulations 1989291 designed to assist duty holders, employers, installation managers, safety representatives, safety committee members and all members of the workforce in the offshore industry with what the regulations require and what must be done to comply with them. The document explains that although the primary responsibility for health and safety resides with the duty holder, “all members of the workforce must play their part if risks are to be eliminated or minimized.”292 It also emphasizes the importance of training of safety representatives, which enables them to effectively represent workers and fulfill their responsibilities and functions under these Regulations. In April 2010, the HSE launched an inspection project to examine the effectiveness of the SI971 Regulations and the effectiveness of those regulations, as well as to collect examples of best practice to present to the offshore industry.293 Forty-one inspections were completed in a six-month period on offshore installations operated by 25 different duty holders. The project helped focus on the power of safety representatives and how to strengthen their ability to effectively perform their duties. It also was well-received by the safety representatives, as it gave them encouragement and recognition, and sent a message to management on the importance of SI971 and the key role of safety representatives and committees in workplace health and safety. The HSE has placed great emphasis and importance on the role of worker involvement and consultation in improving workplace health and safety and reducing major accidents on and offshore. In June 2009, HSE launched a new strategy entitled Be part of the solution, which lists workforce involvement as one of its main priorities, and the agency has published a significant amount of guidance on worker involvement and consultation on its website.294 The Norwegian Working Environment Act addresses the rights and duties of safety representatives and committees in Norway. It applies to nearly all workers in Norway, including onshore and offshore oil workers. The Act provides for the election of government recognized safety representatives whose duty is to “safeguard the interests or employees in matters of the working environment.”295 These

regular basis or following an incident. According to HSE, “this can be of great benefit to the duty holder because it brings an independent look at health and safety factors from the workforce viewpoint. Workers are in the front line and are often well placed to see problems and put forward practical suggestions.” HSE. A guide to the Offshore Installations (Safety Representatives and Safety Committees) Regulations 1989; 2012; p 20. http://www.hse.gov.uk/pubns/priced/l110.pdf (accessed September 4, 2013). 290 Under Regulation 22, safety committees are responsible for reviewing the system of constituencies so as to ensure adequate representation of the workforce on health and safety matters, reviewing training of safety representatives, reviewing the frequency of safety committee meetings and the circumstances under which they may be called, and considering causes of accidents and making recommendations to the installation manager. 291Third edition published in 2012. Available at http://www.hse.gov.uk/pubns/priced/l110.pdf (accessed September 4, 2013). 292 Ibid at 7. 293 See HSE. Offshore workforce involvement and consultation: Compliance Inspection Project. Available at http://www.hse.gov.uk/offshore/si971.pdf (accessed September 4, 2013). 294 See http://www.hse.gov.uk/involvement/hsrepresentatives.htm (accessed September 4, 2013). 295 Act Relating to Working Environment, Working Hours and Employment Protection, Etc. (Working Environment Act). December 2012. Section 6-1. Obligation to elect safety representatives.

Chevron Richmond Refinery Regulatory Report May 2014

57

representatives have the right to information, consultation, and participation in inspections.296 Unlike in the UK currently, they also have the legal authority to halt unsafe work until the regulator decides when the work may continue.297 A fundamental element in effective safety management for major accident prevention is active and equal participation from the regulator, industry, and labor. Each entity provides unique and essential insights, and removing the participation of these entities removes a critical voice in health and safety matters. In the UK and Norway, tripartite systems consisting of industry, the regulator, and the workforce have been established to deal with safety and health issues at the highest levels beyond just site workforce representation. The CSB investigation staff has had extensive discussions with worker representatives who have voiced their opinions on their systems to the CSB. Roy Furre, a Representative from the Norwegian Union of Energy Workers, spoke at the CSB’s 2010 public hearing on the Regulatory Approaches to Offshore Oil and Gas Safety, and stated that the Norwegian working environment and the accompanying petroleum regulations empower unions and safety delegates in all phases of the petroleum activities.298 He also noted that the Norwegian petroleum regulations require that all necessary information about risks and decisions be given to the workers’ representatives.299 During the CSB’s public hearing on Safety Performance Indicators in July 2012, Jake Molloy, the Regional Organizer for the National Union of Rail, Maritime and Transport Workers in the UK, stated that the input of workers is “crucial” in major accident prevention and that “if the people operating these systems and delivering these results are unable for any reason to tell you what the true picture is, everything else is worthless.”300 When speaking at a “Step Change for Safety” Conference in Aberdeen, Scotland, on September 5, 2012, Mr. Molloy noted that attending the public hearing in Houston was “eye opening” and that hearing about the US system was like a “walk back in time.”301

296 Ibid at Section 6-2. Duties of safety representatives. 297 Ibid at Section 6-3. The safety representative’s right to halt dangerous work. See also the Regulations Relating to Health, Safety and the Environment in the Petroleum Activities and at Certain Onshore Facilities (The Framework Regulations) Section 35. It states that “[t]he responsible safety delegate can, pursuant to Section 6-3 of the Working Environment Act, demand that a work operation or work process be halted by the person responsible for the operation or process. The operation or work shall stop immediately if the safety delegate does not accept the implementation of alternative measures.” http://www.ptil.no/framework-hse/category403.html#_Toc357595266 (accessed April 14, 2014).

298 CSB. Public Hearing: Regulatory Approaches to Offshore Oil and Gas Safety. December 15, 2010; p 300. http://www.csb.gov/assets/1/19/Transcript_of_Public_Meeting_12_15_2010.pdf (accessed December 10, 2013). 299 Ibid at 300. 300 CSB. Public Hearing: Safety Performance Indicators. July 23, 2013; p 143. http://www.csb.gov/assets/1/19/CSB_20Public_20Hearing.pdf (accessed December 10, 2013). 301 http://www.youtube.com/watch?v=-xDzb4x8t_c (accessed December 10, 2013).

Chevron Richmond Refinery Regulatory Report May 2014

58

  1. 5

Process Safety Indicators that Drive Performance As the CSB noted in both its July 2012 public hearing on Safety Performance Indicators and its Chevron Interim Report, leading and lagging process safety indicators help drive continuous process safety improvement, as long as regulators utilize these indicators to focus inspections, audits, and investigations, and organizations focus attention on them in a way that makes a difference. Process safety indicators are a significant element of process safety management systems. They measure the strengths and weaknesses of these systems to achieve and maintain safe and reliable operations302 and, if properly defined, collected and used, can identify the successes and flaws of the system.303 Lagging indicators are a “form of reactive monitoring”304 that includes events such as major spills, fires, or gas releases. Leading indicators, on the other hand, are a “form of active monitoring,”305 and are described as events that do not result in severe consequences and usually address safety system performance, such as deviations from safe operating limits or timely maintenance on safety critical equipment.306 Leading indicators “can be considered as measures of process or inputs essential to deliver the desired safety outcome.”307 The general thinking globally is that if companies rely primarily on lagging indicator data, which is retrospective, they are not effectively managing process safety to ensure major accidents are prevented. According to the HSE, “[t]oo many organizations rely heavily on failure data to monitor performance, so improvements or changes are only determined after something has gone wrong. Discovering weaknesses in control systems by having a major incident is too late and too costly.”308 Rather, facilities must identify critical controls to monitor and set leading indicators against each one to show that the system is operating as intended. The HSE was one of the earliest regulators to adopt process safety indicators regulations. In 1995, the agency began requiring companies to report health and safety data, and then published annual reports based on those statistics. In 2006, the HSE developed a step-by-step guidance document entitled Developing process safety indicators309 to assist industry. The guide establishes and discusses in detail six main steps necessary to implement a process safety measurement system, including developing leading and lagging indicators. It also defines leading and lagging indicators for each of the controls in

302 CCPS. Guidelines for Process Safety Metrics; October 2009; p 109. 303 Ibid. 304 HSE. Developing process safety indicators: A step-by-step guide for chemical and major hazard industries; 2006; p 7. http://www.hse.gov.uk/pubns/books/hsg254.htm (accessed May 28, 2013). 305 Ibid. 306 Hopkins, Andrew. Disastrous Decisions: The Human and Organisational Causes of the Gulf of Mexico Blowout; CCH Australia Limited, 2012; p 83. 307 HSE. Developing process safety indicators: A step-by-step guide for chemical and major hazard industries; 2006; p 7. http://www.hse.gov.uk/pubns/priced/hsg254.pdf (accessed October 30, 2013). 308 Ibid at 1. 309 Full title is Developing process safety indicators: A step-by-step guide for chemical and major hazard industries; first published in 2006. http://www.hse.gov.uk/pubns/books/hsg254.htm (accessed May 28, 2013).

Chevron Richmond Refinery Regulatory Report May 2014

59

the risk control system. According to Jake Molloy, “[i]t is our firm belief that the most influential and effective schemes using indicators to measure improvements and major accident prevention are those initiatives generated by our regulator, the Health and Safety Executive [HSE].”310 As discussed in the previous section, a number of large incidents, including BP Texas City and BP Grangemouth, have highlighted the need for the chemical and other major hazard sectors to demonstrate that risks are being adequately controlled. In response to recommendations stemming from such incidents, the COMAH CA developed an Operational Delivery Guide in 2010 on process safety performance indicators setting out four stages to aid facilities in the development of process safety indicators. The document sets out a goal that by the end of 2015 major hazard establishments and duty holders will measure their safety performance and control of risk by way of key leading and lagging performance indicators. Following the 2005 BP Texas City incident, BP developed company-wide process safety indicators, and now includes process safety metrics in performance contracts for its US refinery managers.311 However, existing guidance in the US pertaining to safety performance indicators does not adequately aid companies in managing major hazards onshore. The CSB has noted that in virtually every incident it investigates in the US, process safety indicators are either not used at all or not used effectively.312 Millions of workplaces around the US primarily measure their safety performance using OSHA recordable injury and illness rates, which include slips, trips, and falls. While collecting this type of data is also necessary in hazardous operations, it is not sufficient. Injury rates do not depict the effectiveness of a high hazard facility’s process safety management program.313 For example, the CSB noted in its BP Texas City investigation that BP’s personal injury metrics were described as being at the best level on record; yet, around this same time, in March 2005, BP Texas City experienced the devastating 15-fatality incident, which resulted from a progressive erosion of process safety performance that was not reflected in injury statistics. Following the BP Texas City incident, a number of key recommendations were made to strengthen guidance on indicators in the US. For example, the Baker Panel314 issued the Baker report, which recommended the incorporation of safety indicators to measure safety performance, and stated: The Panel believes that relying exclusively or predominantly on lagging indicators to assess process safety performance is ill-advised. … BP’s reliance on lagging, after-the-fact indicators of process safety performance rather than leading, predictive measures…impaired BP’s ability to measure, monitor and detect deteriorating or degraded process safety conditions and performance… This failure to use a set of effective

310 Molloy Testimony. CSB Indicators Public Hearing Transcript; July 24, 2012; p 139. 311 Hopkins, Andrew. Disastrous Decisions: The Human and Organisational Causes of the Gulf of Mexico Blowout; CCH Australia Limited, 2012; p 84. 312 Donald Holmstrom. CSB Indicators Public Hearing Transcript; July 24, 2012; p 13. 313 Ibid. 314 In the aftermath of the BP Texas City Incident, BP followed the recommendation of the CSB and formed an independent panel known as the Baker Panel to conduct a thorough review of the company’s corporate safety culture, safety management systems, and corporate safety oversight at its US refineries. For a copy of their findings and recommendations see http://www.bp.com/liveassets/bp_internet/globalbp/globalbp_uk_english/SP/STAGING/local_assets/assets/pdfs/Bak er_panel_report.pdf (accessed August 13, 2013).

Chevron Richmond Refinery Regulatory Report May 2014

60

performance metrics that includes leading indicators increased the likelihood that the organisation would identify the need for improvements or additional controls only after something had gone wrong.315 The Baker Panel also noted that it was not enough just to develop process indicators: these indicators needed to be meaningful to the company. As such, the Baker Panel also recommended that “a significant proportion of total compensation of refining line managers and supervisors [be] contingent on satisfactorily meeting process safety performance goals…”316 In its final investigation report on the incident, the CSB made a recommendation to API and the USW to jointly lead development of a consensus standard for leading and lagging process safety indicators to drive performance improvements in the prevention of major incidents. API responded by issuing RP 754, Process Safety Performance Indicators for the Refining and Petrochemical Industries. However, this voluntary standard, which defines a framework of four tiered indicators that incorporate the concepts of lagging to leading measures, has significant shortcomings, as the CSB described in a two-day public hearing on Safety Performance Indicators that was held in July 2012. The CSB analysis found that the ability of RP 754 to drive performance improvement and inform key stakeholders will be hampered by  lagging indicators with insufficient statistical rigor needed to allow for trending or incremental performance improvements;  the lack of well-defined standardized and normalized leading indicators that are needed for comparison among sites, corporations, or to national averages;  weak employee protection requirements; public reporting requirements that will be ineffective to adequately inform stakeholders; and  the lack of broadly based consensus in the standard’s development process.317 As a result, in 2012 the CSB Board designated the response to the CSB’s recommendation as “open- acceptable,”318 meaning that the recommendations recipient is moving in the right direction, but more remains to be done. The CSB also noted in the Chevron Interim Report the important role the public plays in monitoring safety management systems, and referenced CCPS as promoting the sharing of process safety indicators with the public: Sharing performance metrics and results broadly can engage the public as a partner in holding the organization accountable for process safety performance. Making metrics and performance public can be an especially powerful way of maintaining upper management commitment since it will likely be the CEO or other senior managers who will be called to account by the public if goals are not met or performance declines. Communicating process safety successes also demonstrates to

315 Baker, J. The Report of the BP U.S. Refineries Independent Safety Review Panel, 2007; p 194. 316 Ibid at 251. 317 CSB Public Hearing: Safety Performance Indicators. July 23-24, 2012; p 26. http://www.csb.gov/events/csb- public-hearing-safety-performance-indicators/ (accessed August 14, 2013). 318 For more information on recommendations status designations, see http://www.csb.gov/recommendations/faq/#5 (accessed June 21, 2013).

Chevron Richmond Refinery Regulatory Report May 2014

61

employees and the public that positive change can be, and are being, made within an organization.319 The Petroleum Safety Authority (PSA) in Norway provides annual reports to the public on its website assessing indicators it has collected directly from offshore and onshore major hazard facilities since 2000 and 2006, respectively. The PSA utilizes the indicators data found in these reports to identify critical safety areas that must be targeted for improvement in order to prevent near misses and accidents.320 The onshore report, Risk level in the petroleum industry, Onshore facilities,321, 322 includes a description and explanation of the indicators collected and analysis of these data. In this report the PSA notes a decreasing trend in the number of reported hydrocarbon leaks on offshore production facilities between 2007 and 2010.323 However, it is too soon for PSA to assess trends in the onshore indicators data, because the time period for onshore data collection has been relatively short and there are fewer data points with only eight facilities onshore. The PSA also indicated that it will take time for the onshore data to improve as indicators are refined, but recognized that the same approach has already yielded good results in the offshore sector.324 Additional information on data and trends based on safety case regime implementation are provided in Appendix C. 4.6 Regulatory Assessment, Verification, and Intervention To effectively oversee covered facilities and enforce safety case regulations, technically competent regulators review and assess325 safety case reports and utilize preventative inspections and audits to effectively intervene before high-risk activities commence. According to the HSE, “[t]he assessment process is only a part of the COMAH regime and examines at face value the factual information and examines arguments and demonstrations contained in the report against the requirements of the regulations.”326 The HSE places great emphasis during the assessment phase on the adoption of inherently safer designs327 and notes that “[m]ajor accident hazards should be avoided or reduced at source through the application of principles of inherent safety.”328 Conclusions on the adequacy of the safety case report are developed at the end of the assessment process, and, if deficiencies are found, an

319 Center for Chemical Process Safety (CCPS). Guidelines for Process Safety Metrics. 2010; p 109. 320 PSA. Trends in Risk Level: Summary Report 2012 – Norwegian Continental Shelf. 2012; p 1. 321 See http://www.ptil.no/publications/category175.html?ptil_md_art_list-select_group=Category-233. The CSB had the 2010 version of the onshore report translated into English. http://www.ptil.no/getfile.php/PDF/RNNP_2012/Trends%20in%20risk%20level_2012.pdf (accessed September 17,

  1. (accessed September 17, 2013).

322 The corresponding report discussing offshore indicator data is entitled Trends in Risk Level. http://www.ptil.no/getfile.php/PDF/RNNP_2012/Trends%20in%20risk%20level_2012.pdf (accessed September 17, 2013. 323 PSA. Risk level in the petroleum industry, Onshore facilities. 2010; p 80. 324 Ibid. 325 According to the HSE, the “assessment reviews the documentary evidence in the report and further documentation, as appropriate, which is referred to in the report or requested by the assessor.” HSE. The Safety Report Assessment Manual, Sections 2 to 7. p 3. http://www.hse.gov.uk/comah/sram/s2-7.pdf (November 26, 2013). 326 HSE. The Safety Report Assessment Manual, Sections 8 to 15. p 9. http://www.hse.gov.uk/comah/sram/s8- 15.pdf (accessed October 30, 2013). 327 Ibid at 30. 328 HSE. The Safety Report Assessment Manual, Sections 2 to 7. p 3. http://www.hse.gov.uk/comah/sram/s2-7.pdf (November 26, 2013).

Chevron Richmond Refinery Regulatory Report May 2014

62

intervention strategy for the facility is developed to addresses those deficient measures. According to the HSE, assessment of a safety case report or document “is not a discrete activity but leads to further action under the intervention plan for the operator at that establishment.”329 Intervention by the regulator ensures that the facility and its operations are consistent with information provided in the safety case report, and that there are robust systems in place to “reduce the likelihood of hazards and to mitigate their consequences until the associated risks are ALARP.”330,331 Under the safety case regulatory regime, the regulator has the authority to accept the safety case report or reject it and require additional measures to further reduce risks. Preventative inspections and audits by a technically competent regulator can also result in deep challenges to industry, which does not typically happen under the PSM or RMP regulations. In the UK, the COMAH regulations authorize the CA to organize an adequate system of inspections of establishments or other measures of control appropriate to the type of establishment concerned…[that are] sufficient for a planned and systematic examination of the systems being employed at the establishment, whether of a technical, organisational or managerial nature, so as to ensure…(a) that the operator can demonstrate that he has taken appropriate measures to prevent major accidents; (b) that the operator can demonstrate that he has provided appropriate means for limiting the consequences of major accidents both inside and outside the establishment; (c) that the information contained in any report sent to the competent authority by the operator of the establishment adequately reflects the conditions in the establishment…332 The CSB noted in its BP Texas City Final Investigation Report that in the UK, HSE inspectors thoroughly inspect high hazard facilities annually, and all COMAH- covered facilities are inspected every five years. For the approximately ten petroleum refineries in the UK, detailed planned inspections (ranging from 80 to 150 days) are conducted annually for each refinery by a multidisciplinary team (regulatory inspectors, process safety, mechanical engineering, electrical and instrumentation, and human factors specialists).333 The HSE lists its offshore priorities as safety case assessment;334 verification;335 inspection; investigation; and

329 HSE. The Safety Report Assessment Manual, Sections 8 to 15. p 4. http://www.hse.gov.uk/comah/sram/s8- 15.pdf (accessed October 30, 2013). 330 HSE. The Safety Report Assessment Manual, Sections 8 to 15. p 30. http://www.hse.gov.uk/comah/sram/s8- 15.pdf (accessed October 30, 2013). 331 According to HSE, essential considerations to ensure ALARP are “the scope of hazard elimination, the adoption of inherently safer designs, whether good practice has been, or is to be adopted, [and] the application of risk- reducing measures where relevant good practice is not yet established.” Ibid at 30 and 31. 332 COMAH Regulations 1999 Part 6, Regulation 19(1) and (2). 333 The CSB. Investigation Report: BP Texas City Refinery Explosion and Fire. March 2007; p 205. http://www.csb.gov/assets/1/19/CSBFinalReportBP.pdf (accessed October 29, 2013).

Chevron Richmond Refinery Regulatory Report May 2014

63

enforcement.336 In its business plan for 2012-2015, the HSE set out a goal of assessing 72 safety cases onshore and 100 safety cases offshore for 2013 and 2014.337 The work required to assess a safety case report both on and offshore is very resource-intensive (a typical new offshore safety case assessment requires anywhere from 100 to 300 hours of work), and demands that the regulator hire and retain individuals with significant oil and gas experience, specifically in areas such as process safety, human factors, engineering, and organizational performance. In Australia, the Offshore Petroleum and Greenhouse Gas Storage Act 2006 authorizes NOPSEMA to conduct planned inspections of offshore installations to ensure compliance with the Act.338 NOPSEMA notes that planned inspections “are a critical examination of aspects of a facility, its systems and operations with information obtained from the facility safety case.”339 Subjects of planned inspections include risk control measures related to either a Major Accident Event340 or Occupational Health and Safety controls, or both. NOPSEMA states that it conducts at least two per year for each normally manned offshore installation.341 NOPSEMA distinguishes between two types of planned inspections: field-based inspections, which focus on implementation of control measures described in a facility’s safety case, and themed audits, which deal with inspection of organizational issues by following a common theme to direct lines of questioning.342 In a 1992 compliance directive,343 OSHA stated that the primary enforcement model for the PSM standard would be planned, comprehensive, and resource-intensive Program Quality Verification (PQV) inspections.344 These inspections consist of three parts: determining if the elements of a PSM program are in place; evaluating if the programs comply with the requirements of the standard; and verifying compliance with the standard through interviews, data sampling, and field observations. However, OSHA does not make planned inspections, which have the most opportunity for prevention, a high

334 An owner or operator (i.e. the duty holder) is required to submit a safety case to HSE for each offshore installation. HSE then assesses the safety case using both regulations and HSE’s “Assessment Principles for Offshore Safety Cases (APOSC) and must accept it before an installation can operate. See http://www.hse.gov.uk/offshore/aposc190306.pdf (accessed July 31, 2013). 335 Duty holders have a duty under the Offshore Installations (Safety Case) Regulations 2005 to put in place and keep under continual review a verification scheme by which assurance is obtained from an independent competent person (ICP) that safety critical elements and the PFEER (Offshore Installations (Prevention of Fire and Explosion, and Emergency Response) specified plant are suitable and remain suitable for the life of the installation. For more information see http://www.hse.gov.uk/offshore/verification.htm (accessed July 31, 2013). 336 See http://www.hse.gov.uk/offshore/priorities.htm (accessed July 15, 2013). 337 HSE. HSE Business Plan 2012-15; June 2012; p 14. http://www.hse.gov.uk/aboutus/strategiesandplans/businessplans/plan1215.pdf (accessed June 3, 2013). 338 Offshore Petroleum and Greenhouse Gas Storage Act 2006, Sections 600 and 601. See http://www.comlaw.gov.au/Series/C2006A00014 (accessed July 15, 2013). 339 NOPSEMA. Inspection Policy; p 2. http://www.nopsema.gov.au/assets/document/N-02000-PL0025- Inspection.pdf (accessed July 15, 2013). 340 Australia’s Offshore Petroleum and Greenhouse Gas Storage Regulations 2009 define a Major Accident Event as “an event connected with a facility, including a natural event, having the potential to cause multiple fatalities of person at or near the facility.” Chapter 1.5. See http://www.comlaw.gov.au/Details/F2009L04578/Html/Text#param5 (accessed July 15, 2013). 341 For more information, see http://www.nopsema.gov.au/safety/inspections/ (accessed July 15, 2013). 342 For more information, see http://www.nopsema.gov.au/assets/document/N-02000-PL0025-Inspection.pdf (accessed July 15, 2013). 343 Compliance directives are the main method OSHA uses to communicate plans, inspection methods, and compliance expectations to their Compliance Safety and Health Officers (CSHOs) for enforcing a new regulation. 344 OSHA Instruction CPL 02-02-045 (1994).

Chevron Richmond Refinery Regulatory Report May 2014

64

priority. Rather, OSHA lists its inspection priorities as 1) imminent danger situations; 2) fatalities and catastrophes; 3) complaints; 4) referrals; 5) follow-ups; and 6) planned inspections.345 The CSB noted in its BP Texas City Final Investigation Report that for the 10-year period prior to the Texas City incident, federal OSHA had conducted no planned PQV inspections in oil refineries. As a result, CSB recommended in its report that OSHA strengthen the planned enforcement of the OSHA Process Safety Management (PSM) standard by developing more highly trained and experienced inspectors to conduct more comprehensive inspections, such as the PQV audits envisioned in the 1992 directive, at facilities presenting the greatest risk of a catastrophic accident. The intent of the recommendation was to establish a permanent, ongoing planned comprehensive inspections program. Spurred in part by the CSB’s recommendations, OSHA issued the Petroleum Refinery Process Safety Management National Emphasis Program (NEP) on June 7, 2007.346 The NEP was a federal program that established guidelines for inspecting petroleum refineries to assure compliance with the PSM standard. Unlike the PQV approach to inspections, which “employs a broad, open-ended inspection strategy and uses a more global approach to identify compliance deficiencies…,” the NEP “provide[d] a specific tool to evaluate compliance with the [PSM] standard…[which] identifies a particular set of requirements from the PSM standard from which CSHOs [Compliance Safety and Health Officers] are to review documents, interview employees, and verify implementation for specific processes, equipment, and procedures.”347 The NEP inspections were meant to be more targeted and efficient than PQV inspections. However, the inspections being conducted pursuant to the NEP were ended in 2011 partly because they were very time- consuming and resource-intensive.348 OSHA has publicly stated349 that NEP inspection hours were roughly 40 times greater than average OSHA inspection hours. OSHA described the NEP as its most effective emphasis program in its history, citing a disturbing number of issues and subsequent citations. In 1999, EPA established an audit350 program to help ensure compliance with the RMP program. The audits were intended to provide an independent verification of the information in the RMP and include

345 “OSHA Fact Sheet: OSHA Inspections,” available at http://www.osha.gov/OshDoc/data_General_Facts/factsheet-inspections.pdf (accessed on May 20, 2013). 346 Originally Directive Number CPL 03-00-004. Extended August 18, 2099 as Directive Number CPL 03-00-010 to allow more time to complete NEP inspections under the original CPL 03-00-004. 347 CPL 03-00-004, Section X(D)(1). 2007. 348 Jordan Barab, Deputy Assistant Secretary of Labor for Occupational Safety and Health, stated the following during a symposium at the Mary K O’Connor Process Safety Center: “As our refinery NEP comes to an end, we are engaged in a process of trying to figure out how we will address refinery PSM issues in the future. Clearly OSHA's past practice of targeting inspection according to injury and illness numbers is not adequate. However, because of resource limitations, we are also unable to commit to a full-time NEP.” “Saving Lives and Transforming Workplaces: OSHA and Process Safety.” Remarks for Jordan Barab, Deputy Assistant Secretary of Labor for Occupational Safety and Health. Mary Kay O’Connor Process Safety Center International Symposium. Texas A&M University, College Station, Texas. Wednesday, October 27, 2010. https://www.osha.gov/pls/oshaweb/owadisp.show_document?p_table=SPEECHES&p_id=2311 (accessed January 13, 2014). 349 See Barab, Jordan. OSHA’s Refinery & Chemical National Emphasis Programs. Power Point presentation made at CSB Public Hearing on Process Safety Indicators; July 20, 2012. http://www.csb.gov/UserFiles/file/Barab%20%28OSHA%29%20PowerPoint.pdf (accessed August 14, 2013). Also see Transcript of CSB Public Hearing on Safety Performance Indicators; p 52. http://www.csb.gov/assets/1/19/CSB_20Public_20Hearing.pdf (accessed August 14, 2013). 350 Within Part 68, the term “audit” refers to the process that implementing agencies may use to verify the quality of the RMP submitted to EPA and require revisions when necessary to ensure compliance. RMP audits will generally involve on-site verification of a facility’s underlying risk management program. Section 68.220 of the RMP rule

Chevron Richmond Refinery Regulatory Report May 2014

65

on-site inspections. Under these requirements, the implementing agency (EPA or a correlating state agency) must “periodically audit” RMPs to review their adequacy and require revisions when necessary to ensure compliance. 351 Between fiscal years (FYs) 2010 and 2012, each EPA Region responsible for implementing the RMP program was mandated by EPA to perform inspections352 at five percent of the total number of regulated facilities in the regions, and a certain percentage of these facilities were required to be high-risk.353 In FY 2010, regions were to conduct 10 percent of the inspections at high-risk facilities, and in FYs 2011 and 2012, 25 percent at high-risk facilities.354 Although EPA has acknowledged that “full compliance with the Risk Management Program regulations cannot be determined without on-site or independent verification of all or part of the information submitted in an RMP[,]”355 the EPA has not effectively implemented the audit and inspection elements of the Risk Management Program. As mentioned above in Section 3.2.2.3.2, the EPA Office of Inspector General (OIG) concluded in 2009 that over half of the RMP-covered facilities identified in the US as high-risk356 had never received an on-site inspection or audit, and over 65 percent of all active RMP facilities had not received an on-site inspection or audit since inception of the RMP program in 1999.357 The EPA OIG also noted that of the 296 uninspected high-risk facilities managed by EPA, 151 of these could each impact 100,000 people or more in a worst-case accident scenario.358

requires implementing agencies to select facilities for audits based on specific criteria, and to follow a specific process for resolving audit findings prior to any enforcement action. See EPA. Guidance for Conducting Risk Management Program Inspections under Clean Air Act Section 112(r); January 2011; p 4. Available at http://www.epa.gov/osweroe1/docs/chem/clean_air_guidance.pdf (accessed June 11, 2013). 351 40 CFR §68.220 (1999). 352 RMP inspections “are different from audits in that facilities are not necessarily selected for inspection based on Part 68 regulatory criteria, and inspections can lead directly to implementing agency enforcement actions for regulatory violations. Also, RMP inspections always involve on-site verification activities.” See EPA, “Guidance for Conducting Risk Management Program Inspections under Clean Air Act Section 112(r).” January 2011; page 4. Available at http://www.epa.gov/osweroe1/docs/chem/clean_air_guidance.pdf (accessed June 11, 2013). 353 Criteria used to determine high-risk includes the number of people in the footprint (if it is more than 100,000); accidental releases reported in the RMP; the hazard index (percentage of chemical quantity above threshold and number of chemicals onsite); and the number of Program Levels 2 or 3. US EPA Region 9 Emergency Prevention and Preparedness Program; Stanislaus County Powerpoint; March 2013. See http://www.condorearth.com/files/08- Enforcement_Priorities-Mary_Wesling.pdf (accessed May 14, 2013). 354 EPA OIG. Improvements Needed in EPA Training and Oversight for Risk Management Program Inspections; March 21, 2013; p 7. http://www.epa.gov/oig/reports/2013/20130321-13-P-0178.pdf (accessed June 11, 2013). 355 EPA. Guidance for Conducting Risk Management Program Inspections under Clean Air Act Section 112(r); January 2011; p 4. http://www.epa.gov/osweroe1/docs/chem/clean_air_guidance.pdf (accessed June 11, 2013). 356 A high-risk facility is one that meets one of more of the following characteristics established by the EPA Office of Emergency Management: 1) Facilities whose reported RMP worst-case scenario population exceeds 100,000 people; 2) Any RMP Program facility with a hazard index greater than or equal to 25; and/or 3) Facilities that have had one or more significant accidental releases within the previous five years. See “EPA Office of Inspector General, “Improvements Needed in EPA Training and Oversight for Risk Management Program Inspections.” March 21, 2013; Page 5. Available at http://www.epa.gov/oig/reports/2013/20130321-13-P-0178.pdf (accessed June 11, 2013). 357 EPA OIG. Evaluation Report: EPA Can Improve Implementation of the Risk Management Program for Airborne Chemical Releases; February 10, 2009; p 15. 358 Ibid.

Chevron Richmond Refinery Regulatory Report May 2014

66

  1. 7

Independent, Competent, Well-Funded Regulator As noted by NOPSEMA, a safety regulator “provides ‘independent’ assurance to society, governments and industry that companies have identified the risks to health and safety and have put appropriate measures in place to control these risks.”359 To ensure that companies are managing risks and employing the best available standards and technologies, the regulator must be independent,360 well-resourced, and retain a sufficient number of technically competent, experienced, and well-trained staff that can critically assess companies’ safety case reports and performance. Without independent and competent examinations, the safety case report becomes a meaningless document in terms of controlling risk and preventing major accidents. Offshore regulators in the UK and Australia also utilize independent third party specialist safety companies recognized by the regulator. Third party inspectors review important aspects of the safety case, such as safety critical elements361 and performance standards.362 Third party inspections, however, do not take the place of rigorous inspections by the regulator. As of June 2012, the HSE employed roughly 3,300 staff, of which 1,381were front-line inspectors,363 whose responsibilities include conducting preventative inspections of roughly 950 COMAH facilities throughout the UK. The HSE employs roughly 105 inspectors to inspect approximately 300 offshore installations, in effect a one to three ratio. As such, the HSE, with a budget of roughly $472 million,364 has the authority to offer higher specialist salaries to attract and retain more experienced, competent personnel. According to information obtained from the HSE, in 2011 and 2012 their onshore specialist inspector pay ranged from $85,806 to $102,344, and their offshore inspector pay ranged from $134,387 to $148,423 at the highest grade and $116,288 to $131,499 at the next highest grade.365 A safety case regime requires regulators to conduct preventative facility inspections and audits against the safety case to ensure that specified controls are functioning as intended. Regulators must be capable of interacting as equals with company risk managers when conducting these inspections. Former HSE staff

359 See http://www.nopsema.gov.au/safety/safety-case/safety-case-approach/ (accessed May 31, 2013). 360 You will find a more detailed discussion of regulator independence in the CSB’s upcoming investigation report on the Macondo incident. 361 The UK HSE requires offshore installations to define “safety critical elements,” which are the technical barriers in place for the prevention, detection, control, and mitigation of major accident risks. Lauder, Bob. Major Hazard (Asset Integrity) Key Performance Indicators in use in the UK Offshore Oil and Gas Industry. Paper at the CSB Indicators Public Hearing. July 24, 2012. 362 In the UK, duty holders have a duty under the Offshore Installations (Safety Case) Regulations 2005 to “put in place and keep under continual review a verification scheme by means of which assurance is obtained from an independent competent person (ICP) that safety critical elements and PFEER [Offshore Installations ) Prevention of Fire and Explosion, and Emergency Response] specified plant are suitable and remain suitable for the lifetime of the installation.” See http://www.hse.gov.uk/offshore/verification.htm (accessed November 14, 2013). 363 HSE. The Health and Safety Executive Annual Report and Accounts 2011/12; July 2012; p 30. http://www.hse.gov.uk/aboutus/reports/1112/ar1112.pdf (accessed June 3, 2013). 364 For 2013/2014, HSE’s budget is listed as 308.1 £million. HSE recovers approximately 40 percent of its costs through income mainly in the nuclear, offshore, and chemical sectors, and the remainder is funded from Grant-in- Aid pursuant to the Health and Safety at Work etc. Act 1974, and fee for intervention (FFI).364 See HSE, “HSE Business Plan 2012-15,” July 2012; page 17. Available at http://www.hse.gov.uk/aboutus/strategiesandplans/businessplans/plan1215.pdf (accessed June 3, 2013). Conversion of UK Pounds to US Dollars is based on 1£ = 1.5313$. See http://wsj.com/mdc/public/page/2_3021-forex.html (accessed June 4, 2013). 365 Conversion of UK Pounds to US Dollars is based on 1£ = 1.5313$. See http://wsj.com/mdc/public/page/2_3021- forex.html (accessed June 4, 2013).

Chevron Richmond Refinery Regulatory Report May 2014

67

have communicated to the CSB that the HSE seeks new employees with good communication skills in addition to education and experience, as the job of a safety case regulator requires encouraging companies to aspire to make safety improvements that they may not want to make. One message that current and former HSE staff have repeated is that the industry believes having competent regulatory staff adds significant value to their business.366 In any country, competent offshore regulatory staff can persuade companies to manage risks in a rigorous manner, knowing that if not done properly, their risk management practices will be challenged.367 This competence is also essential for companies’ confidence in the accuracy of the regulatory staff’s advice, inspections, and citations. According to a literature review on the safety case in the UK, “[s]ome companies see as positive the requirement to have ‘someone external to the company keeping you on your toes by regularly asking if you have done all you can,’ and that it ‘forces you to convince yourself’ that you have covered all the risks.”368 In the US, the federal government has used extensive resources to retain the best available talent to focus on health and safety oversight of US commercial and defense nuclear facilities.369 For instance, many nonsupervisory technical staff at the US Nuclear Regulatory Commission370 (NRC) and the Defense Nuclear Facilities Safety Board are paid at the top of the General Schedule pay schedule.371 Virtually all technical staff at the Defense Nuclear Facilities Safety Board hold technical master’s degrees and approximately 25 percent hold doctoral degrees.372 The federal government has a unique category of non-executive positions that involve high-level research and development in the physical, biological, medical, or engineering sciences, or a closely-related field.373 These are known as “Scientific or Professional” positions, and they are classified above the highest general schedule pay level.374 These special salary authorizations contribute to the technical agencies’ ability to compete with private industry to recruit and retain highly competent staff. The NRC also has a type of funding mechanism that ensures that the agency’s budget adequately covers its regulator activities, as the NRC is required by law to recover at least 90 percent of its budget through licensing and inspection fees.375

366 Based on conversations between the CSB staff and Magne Ognedal (Norway PSA), Ian Whewell (the UK HSE), Peter Wilkinson (Australia NOPSA [forerunner of NOPSEMA]), and John Clegg (inaugural CEO of NOPSA). 367 Peter Wilkinson, Manager Review Implementation Team, Offshore Safety Section, Australia Department of Industry, Tourism and Resources and “architect” of NOPSA. Presentation to the National Research Centre for Occupational Health and Safety, ANU (May 15, 2002). 368 Vectra Group Limited. Literature Review on the Perceived Benefits and Disadvantages of UK Safety Case Regimes; 2003; p 40. 369 DNFSB FY2013 Budget Justification at p. 100 http://www.dnfsb.gov/sites/default/files/About/Budget%20Requests/2013/FY%202013_CONG%20BUDGET_FIN AL.PDF (accessed May 15, 2013). 370 Presentation by NRC Executive Director Bill Borchardt, January 2011. 371 $123,758 to $155,500 per year in 2012 in Washington, DC. See https://www.opm.gov/oca/12tables/html/dcb.asp (accessed May 15, 2013). 372 DNFSB FY2013 Budget Justification at p. 100 http://www.dnfsb.gov/sites/default/files/About/Budget%20Requests/2013/FY%202013_CONG%20BUDGET_FIN AL.PDF (accessed May 15, 2013). 373 http://www.opm.gov/ses/recruitment/stpositions.asp (accessed May 15, 2013). 374 http://www.opm.gov/ses/recruitment/stpositions.asp (accessed May 15, 2013). 375 Section 6101 “NRC User Fees and Annual Charges,” Omnibus Budget Reconciliation Act, Pub. L. 103-66. 107 Stat. 312 (Aug. 10, 1993).

Chevron Richmond Refinery Regulatory Report May 2014

68

Another method by which the NRC is able to attract and retain competent technical staff is its extensive training programs. For new inspection staff, the NRC requires a series of courses, assessments, and simulation, all of which takes approximately two years to complete.376 Inspectors must have a bachelor’s degree in engineering or a degree in a relevant scientific field and Professional Engineer certification.377 The agency operates a technical training center in Chattanooga, Tennessee, with various control room simulators that mirror licensees’ facilities. The NRC staff is expected to sufficiently understand this equipment so that they are able to conduct sufficient audits and investigations.378 Before he or she is fully qualified to conduct inspections, inspector candidates must be recommended by the NRC inspector qualification board and certified by the regional administrator or division director.379 As will be discussed in greater detail under Section 5.0, at the time of the Chevron incident, a majority of the regulators responsible for oversight of Chevron and other petroleum refineries in California did not have sufficient, sustainable funding or staffing to oversee major accident prevention activities. An effective safety case regulatory system would necessitate that the California industry regulator be well- resourced and retain a sufficient number of competent, well-trained and experienced staff to critically assess a company’s safety case. The overall knowledge and expertise of the regulator must at a minimum match that of industry in order for the regulator to successfully assess a company’s safety case with the ultimate goal of preventing major accidents.

376 NRC Inspection Manual, Qualification Program for Operating Reactor Programs (Ch. 1245) at 4, available at http://pbadupws.nrc.gov/docs/ML1110/ML11105A153.pdf (accessed May 28, 2013). 377 NRC Reactor Inspector Job Posting No. R-I/DRS-2013-0001 378 See, e.g., http://www.iaea.org/ns/tutorials/regcontrol/regbody/reg2124.htm (accessed May 28, 2013). 379 NRC Inspection Manual, Qualification Program for Operating Reactor Programs (Ch. 1245) available at http://pbadupws.nrc.gov/docs/ML1110/ML11105A153.pdf

Chevron Richmond Refinery Regulatory Report May 2014

69

  1. 0 Oversight of Petroleum Refineries in California

In California, there currently exists a patchwork of primarily activity-based federal, state, and local laws and regulations aimed at preventing harmful releases of hazardous materials at facilities such as petroleum refineries. This regulatory framework does not foster continuous improvement by driving companies to reduce risks of their hazardous activities to ALARP, nor does it have the requisite number of regulatory staff with the skills, knowledge, and experience to provide sufficient oversight. 5.1 Cal/OSHA 5.1.1 Background Information Section 18 of the OSHAct380 encourages states to develop and implement their own job safety and health programs. Twenty-five states (including California), Puerto Rico and the Virgin Islands currently implement OSHA-approved State Plans.381 States must set job safety and health standards that are “at least as effective as” comparable federal standards; most adopt standards that are identical to the federal standards.382 California was certified as an OSHA State Plan state on August 12, 1977.383 California’s Division of Occupational Safety and Health (Cal/OSHA) administers the California Occupational Safety and Health Program. A PSM District Office384 within Cal/OSHA enforces California’s PSM standard, which is established under Title 8, Section 5189 of the California Code of Regulations (CCR) and entitled Process Safety Management of Acutely Hazardous Materials.385,386 The PSM District Office is comprised of seven inspectors, known as Associate Safety Engineers, and one District Manager to regulate nearly 1,700 PSM-covered facilities in California, including 14 petroleum refineries. Only one of these individuals has a technical background, with a degree in Chemical Engineering. Appendix B of this report summarizes the key differences between the federal and California PSM standards and the safety case regulatory regime. A more detailed analysis of those differences will be provided in the remainder of Section 5.1.

The CSB in its Interim Report identified a number of weaknesses of Chevron’s process safety performance. In many of these causal issues, Chevron was not required to perform at a more effective level by the existing California PSM regulations. In Table 1 below, the CSB identifies the causal issues or findings, which highlight the gaps in the California and federal PSM regulations, and how each issue is more effectively managed in the safety case regulatory regime. In this section of the report, some of these examples will be examined in relation to key features of an effective regulatory approach such as the

380 29 U.S.C. §667 (2004). 381 These are referred to informally as OSHA State Plans. OSHA approves and monitors State plans and provides up to 50 percent of an approved plan's operating costs 382 29 U.S.C. §667 (c)(2) (2004). Also see http://www.osha.gov/dcsp/osp/faq.html (accessed May 13, 2013). 383 See http://www.osha.gov/dcsp/osp/stateprogs/california.html (accessed June 17, 2013). 384 The California PSM District Offices were established in 2001 after the February 1999 Tosco refinery incident in which four workers were fatally injured following the ignition of a highly flammable material during a turnaround operation. In January 2012 the two district offices were combined into one PSM District Office. 385 See http://www.osha.gov/dcsp/osp/stateprogs/california.html (accessed May 13, 2013). 386 8 CCR §5189 (2012).

Chevron Richmond Refinery Regulatory Report May 2014

70

safety case. More information on these causal findings can also be found in the CSB Chevron Interim Report.

Process Safety Element Causal Finding California PSM Regulation The Safety Case Regulatory Regime** MOC Inspection recommendation to upgrade pipe to 9- Chrome not implemented. The MOC to implement the recommendation narrowed the scope allowing the 52- inch component that failed to remain in service. Implementation of 9- Chrome could have prevented the incident.387 MOC element requires implementation of written procedures to manage changes that shall address the impact of the change on health and safety; however the element is activity based and there is no requirement to implement effective recommendations or control hazards. There is no requirement in the MOC element to consider inherent safety. Cal/OSHA did not cite Chevron for this issue. Duty holder is required to drive risk to ALARP. Description of MOC procedures and demonstration of their effectiveness in managing major accident hazard risk are a key requirement of the safety case. Implementation of the concept of inherent safety is required.388

 Unless otherwise noted, California and federal PSM requirements are nearly identical. ** Regulatory regimes such as offshore in Norway have many attributes of the safety case regulatory regime but are not called the safety case regulatory regime. 387 For more information, see CSB’s Chevron Richmond Refinery Interim Investigation Report. April 2013; p 41 and 42. http://www.csb.gov/assets/1/19/Chevron_Interim_Report_Final_2013-04-17.pdf (accessed October 30, 2013). 388 According to the HSE, essential considerations for determining whether a duty holder has reduced risks to ALARP include “the adoption of inherently safer designs…”. HSE. The Safety Report Assessment Manual, Sections 8 to 15. p 30. http://www.hse.gov.uk/comah/sram/s8-15.pdf (accessed October 30, 2013). The HSE also notes that the guidance to COMAH Regulation 4 (General Duty) “describes the application of all measures necessary to reduce risk of a major accident to ALARP based on a hierarchical approach (inherent safety, prevention, control, mitigation).” Ibid at 8.

Chevron Richmond Refinery Regulatory Report May 2014

71

Process Safety Element Causal Finding California PSM Regulation The Safety Case Regulatory Regime** MOC Chevron conducted MOCs to evaluate proposed changes to crude feed that introduced higher sulfur concentration. However, Chevron failed to thoroughly evaluate the change of increasing sulfur weight percentage in crude oil feed and to assess how it might affect corrosion rates within the 4-sidecut piping circuit. Cal/OSHA did not issue any citations for failing to consider the impact of corrosion in the MOC process when sulfur composition in the crude oil feed was increased.389 MOC element is activity- based rather than performance based and requirements in RAGAGEP such as API 570390 do not apply to the MOC element of PSM. Cal/OSHA did not cite Chevron for this issue. Duty holder is required to drive risk to ALARP. Duty holder must identify in the safety case report the standards that they are using to reduce risk such as API 570. The implementation of those standards can be enforced by the regulator to achieve ALARP. PHA In its 2009 crude unit PHA, Chevron simply cited non- specific, judgment-based qualitative safeguards such as: utilizing metallurgy to minimize corrosion, having effective maintenance and inspection programs, and providing pipe wall corrosion allowances. The effectiveness of these safeguards was neither evaluated nor documented; instead the safeguards were merely listed in the PHA. While the PHA element requires addressing the control of hazards, it does not require addressing the effectiveness of the controls or using the hierarchy of controls. For example, the standard would not require the use of improved metallurgy or inherent safety to mitigate corrosion hazards. Cal/OSHA did not cite Chevron for this issue. Requires the use of the most effective practical safeguards to achieve ALARP. The safety case requires the use of inherently safer design and the hierarchy of controls.391

389 For more information, see CSB’s Chevron Richmond Refinery Interim Investigation Report. April 2013; p 34, 35 and 36. http://www.csb.gov/assets/1/19/Chevron_Interim_Report_Final_2013-04-17.pdf (accessed October 30, 2013). 390 API 570. Piping Inspection Code: In-service Inspection, Rating, Repair, and Alteration of Piping Systems. November 2009. 391 According to the HSE, essential considerations for determining whether a duty holder has reduced risks to ALARP include “the adoption of inherently safer designs…”. HSE. The Safety Report Assessment Manual, Sections 8 to 15. p 30. http://www.hse.gov.uk/comah/sram/s8-15.pdf (accessed October 30, 2013). The HSE also notes that the guidance to COMAH Regulation 4 (General Duty) “describes the application of all measures necessary to reduce risk of a major accident to ALARP based on a hierarchical approach (inherent safety, prevention, control, mitigation).” Ibid at 8.

Chevron Richmond Refinery Regulatory Report May 2014

72

Process Safety Element Causal Finding California PSM Regulation The Safety Case Regulatory Regime** PHA The 4-sidecut line was analyzed in the most recent crude unit PHA. Corrosion was not identified as a potential cause of a leak/rupture in the piping. Damage mechanism hazard reviews are not required by the PSM regulation. The process hazard analysis element does not require consideration of RAGAGEP such as API RP 571, Damage Mechanisms Affecting Fixed Equipment in the Refining Industry. Cal/OSHA did not cite Chevron for this issue. For example in the UK the HSE has worked with the industry to develop guidance on damage mechanism hazard reviews in the UK's offshore petrochemical industry. The implementation of best practice standards referenced by a duty holder’s safety case report may be enforced by the regulator to achieve ALARP. Incident Investigations Chevron made recommendations following its investigation of sulfidation incidents at Richmond, Salt Lake City and Pascagoula refineries requiring 100 percent component inspection in high risk piping systems. These recommendations were not implemented in the Richmond refinery crude unit prior to the incident. In 2007 Chevron identified the inherently safer solution of improved metallurgy to prevent sulfidation corrosion but only applied it to the crude unit small spool piece that failed. Neither California nor federal PSM regulations require root cause investigations or recommendations to be developed as the result of incident investigations. While California does require taking action to prevent reoccurrence, (goes beyond federal OSHA) it does not drive risk to ALARP. Cal/OSHA did not cite Chevron for this issue. Federal PSM does not require the development of recommendations or the prevention of future incidents. Investigation of incidents is required to demonstrate legal compliance with framework legislation. ALARP requirement would require remedial action including cross- company learning from incident investigations. HSE can require safety case duty holder compliance with investigation report recommendations (e.g. Buncefield Report- “determine SIL level requirements for overfill protection”).

Chevron Richmond Refinery Regulatory Report May 2014

73

Process Safety Element Causal Finding California PSM Regulation The Safety Case Regulatory Regime** Mechanical Integrity Chevron was instrumental in the development of API RP 939-C, which suggests ("should") but does not require ("shall") that 100 percent component inspection be performed. API states that the use of "shall" denotes minimum requirements in the use of the standard - API RP 939- C has no minimum requirements (no substantive "shalls" are used in the recommended practice). The mechanical integrity element of PSM requires that for inspection and testing procedures, employers follow RAGAGEP. However, API RP 939-C has no minimum requirements. Nonetheless, Cal/OSHA cited Chevron for failure to follow API RP 939-C under this mechanical integrity provision. In the federal regulatory context, this approach has been called into question by the recent administrative law judge decision in BP Products. This case is scheduled for review by the full commission. In a safety case regime, the regulator can reject the use of weak and inadequate standards referenced in a safety case report (by rejecting the report) and can require more rigorous performance to achieve ALARP.

Chevron Richmond Refinery Regulatory Report May 2014

74

Process Safety Element Causal Finding California PSM Regulation The Safety Case Regulatory Regime** Inherent Safety Chevron employees have recommended implementing inherently safer designs through the MOC process, incident investigations, technical reports, and past employee recommendations. However, the CSB has not identified any documented, thorough analysis of the proposed inherently safer solutions. In addition, Chevron has repeatedly failed to implement proposed inherently safer recommendations. Had Chevron implemented these recommendations, the incident could have been prevented. Neither California nor federal PSM regulations require the use or implementation of inherent safety. Cal/OSHA did not cite Chevron for this issue. In its Interim Report, the CSB made a recommendation to the California legislature and the Governor of California to use inherently safer systems analysis and the hierarchy of controls to the greatest extent feasible in establishing safeguards for identified process hazards. Safety case requires the implementation of inherently safer systems analysis.392 Regulator Enforcement Despite numerous safety system deficiencies the Cal/OSHA regulator failed to identify these issues prior to the incident. Cal/OSHA conducted three planned inspections prior to the incident that resulted in no citations or fines. The CSB determined Cal/OSHA lacked sufficient resources and numbers of highly qualified inspectors. California is adding 15 additional inspectors to its PSM unit. The Governor's Interagency Task Force on Refinery Safety will be proposing to implement additional recommendations from their draft report. A key feature of the safety case is a rigorous review of the safety case report that may be accepted or rejected by the regulator. Preventative audits of covered facilities are regularly performed by technically competent, well resourced regulators.

392 According to the HSE, essential considerations for determining whether a duty holder has reduced risks to ALARP include “the adoption of inherently safer designs…”. HSE. The Safety Report Assessment Manual, Sections 8 to 15. p 30. http://www.hse.gov.uk/comah/sram/s8-15.pdf (accessed October 30, 2013). The HSE also notes that the guidance to COMAH Regulation 4 (General Duty) “describes the application of all measures necessary to reduce risk of a major accident to ALARP based on a hierarchical approach (inherent safety, prevention, control, mitigation).” Ibid at 8.

Chevron Richmond Refinery Regulatory Report May 2014

75

Process Safety Element Causal Finding California PSM Regulation The Safety Case Regulatory Regime** Workforce Involvement The workers in previous loss of containment incidents raised concerns about the level of corrosion in the Crude and RLOP incidents, but their concerns were not effectively addressed prior to the August 6, 2012, incident. The workforce participation element requires an employer to develop a written plan to "ensure employee participation in process safety management…” including "consultation with employees and their representatives on the conduct and development of the elements of process safety management...” However, development of a written plan to satisfy the regulatory requirements does not ensure that workers and their representatives in practice are able to effectively participate in a company's safety management system such as PHAs, MOCs, and investigation activities. Safety case sets out a legal framework for the participation of employees on health and safety-related matters, the election of safety representatives, and the establishment of safety committees to serve health and safety related functions. Workforce participation practices are documented by the duty holder and submitted to the regulator.

Table 1. CSB Causal Findings.

  1. 1.2

Analysis 5.1.2.1 ALARP Unlike the OSHAct, the California Occupational Safety and Health Act does not have a General Duty Clause. Rather, Section 5189 was established to “eliminate to a substantial degree, the risks to which employees are exposed in petroleum refineries, chemical plants and other facilities.”393 By focusing on the significant reduction of risk, this language supports the principle of ALARP, which requires a showing by the company that “there are no other practical measures that could reasonably be taken to reduce risks further.”394 However, this section, which lays out the “scope and purpose” of the regulation, is not an enforceable element of the regulation that is subject to citations, and the remaining PSM regulation elements do not lead in practice to that result. Rather, California’s PSM standard has remained activity-based, with many activity-based elements almost identical to the federal PSM standard. For example, an employer must “perform a hazard analysis [PHA] appropriate to the complexity of the

393 8 CCR §5189 (a) (2012). 394 ALARP Guidance Note N-04-300-GN0166, Rev. 3 (Dec. 2011) available at http://www.nopsema.gov.au/assets/document/N-04300-GN0166-ALARP.pdf (accessed May 15, 2013).

Chevron Richmond Refinery Regulatory Report May 2014

76

process for identifying, evaluating, and controlling hazards involved in the process....”395 The PHA must address hazards of the process; engineering and administrative controls applicable to the hazards and their relationships; consequences of failure of these controls; facility siting; human factors; a qualitative evaluation of a range of the possible safety and health effects of the failure of controls on facility employees; and the identification of any previous incident which had a likely potential for catastrophic consequences in the workplace.”396 This language does not support the principle of ALARP, and makes no mention of risk or continuous improvement in any way. As a result, PHAs satisfy the California PSM regulatory requirement by merely listing safeguards; there is no requirement to evaluate or document the effectiveness of these safeguards, or to show that the safeguards in place are effectively reducing risks. As discussed in the CSB’s Interim Report on the Chevron incident, Chevron cited in its 2009 crude unit PHA non-specific, judgment-based qualitative safeguards such as: utilizing metallurgy to minimize corrosion, having effective maintenance and inspection programs, and providing pipe wall corrosion allowances.397 The effectiveness of these safeguards was neither evaluated nor documented. Had the adequacy of these safeguards been verified, improved safeguards intended to protect against sulfidation- induced failure of carbon steel piping could have been recommended. In addition, while the 4-sidecut line was analyzed in this PHA, corrosion was not identified as a potential cause of a leak/rupture in the piping (emphasis added). A corrosion review, also referred to as a damage mechanism hazard review, analyzes hazards presented by all process failure mechanisms such as corrosion and cracking. This type of review, while considered to be good practice,398 is not required by the PSM regulations either federally or in California, and as such the CSB made a recommendation in its Interim Report to require these in future California PHAs. Under a safety case regulatory regime, the regulator has the ability to drive industry to adapt new technologies and safer practices as soon as they are developed; new rulemaking is not required for immediate improvements, because companies are obligated to continually work toward specified performance goals such as reducing risks to ALARP. Therefore, under a safety case regulatory regime the regulator could require these types of reviews to be conducted to reduce risk without requiring additional legislation. Cal/OSHA does not typically review a company’s PHA as part of its routine oversight of process safety management unless there is a specific complaint, accident, or targeted inspection. Nor does it “accept” a company’s PHA and proposed hazard mitigations. Therefore, prior to the August 2012 incident, Cal/OSHA inspectors did not require any additional information or analysis to be provided in the Chevron crude unit PHA. Highlighting the reactive nature of the PSM standard, Cal/OSHA inspected the Chevron facility post-incident and issued 17 citations related to the incident and eight additional citations, with a total proposed fine of nearly $1 million. Only one citation related to PHAs, and it was not associated with evaluating the effectiveness of safeguards or failure to control the 4-sidecut corrosion hazard. Rather, the emphasis was that Chevron’s PHA did not adequately account for hazards caused by other units

395 8 CCR §5189 (e)(1) (2012). 396 8 CCR §5189 (e)(2) (A) through (G) (2012). 397 Corrosion allowance refers to extra wall thickness added as a safety factor to the design of a piece of equipment beyond that needed solely for mechanical considerations such as design temperature and pressure. This extra thickness is provided to accommodate for expected loss of wall thickness due to corrosion over the life of the equipment. 398 API RP 571, Damage Mechanisms Affecting Fixed Equipment in the Refining Industry, describes common process failure mechanism and is considered to be good practice for analyzing risks presented by process failure mechanisms such as corrosion and cracking.

Chevron Richmond Refinery Regulatory Report May 2014

77

associated with the crude unit. This again highlights the lack of a requirement for Chevron to demonstrate that risks have been reduced to ALARP, or for Chevron to provide this type of analysis to Cal/OSHA to review.

  1. 1.2.2

Adaptability and Continuous Improvement

Of the 25 Cal/OSHA citations mentioned above, two were issued to Chevron for its failure to follow API RP 939-C, Guidelines for Avoiding Sulfidation (Sulfidic) Corrosion Failures in Oil Refineries as RAGAGEP. This voluntary API standard will be discussed in greater detail in the CSB’s Final Investigation Report on the Chevron incident. However, it is important to note for purposes of this report that API RP 939-C is a permissive and voluntary standard merely intended to provide guidance to industry personnel on how to address sulfidation corrosion in petroleum refining operations. Existing safety guidelines use words “shall” and “should” to denote either requirements or recommendations. API RP 939-C does not use the word “shall”; as such, it contains no requirements for industry. While the regulator in a safety case regulatory regime has the authority to analyze and challenge the requirements of API RP 939-C with the goal of driving continuous improvement and risk reduction (note the Buncefield examples discussed in Section 4.3), in the present case Cal/OSHA utilized the voluntary practice as an opportunity to issue a citation to Chevron post-incident. Cal/OSHA did not analyze API RP 939-C to determine whether its provisions are sufficient to reduce risks and manage hazards. It also remains to be seen whether this citation will be upheld considering the permissive language contained within the standard. Chevron has investigated a number of sulfidation incidents at its refineries over the years, including Richmond, Salt Lake City, and Pascagoula. Figure 2 shows a timeline of Chevron’s key sulfidation events. In January 2007, a failure due to sulfidation corrosion caused a serious fire in the Chevron Richmond Refinery crude unit resulting in a CWS Level 3 alert, injuring one worker and initiating a shelter-in-place for the surrounding community. As a result of these investigations, Chevron made internal recommendations to require 100 percent component inspections in high-risk piping systems. However, these recommendations were not implemented in the Richmond Refinery crude unit prior to the incident, highlighting a lack of learning from previous incidents by Chevron.

Chevron Richmond Refinery Regulatory Report May 2014

78

Figure 2. Chevron's key sulfidation events between 1974 and 2013.

In addition, as a result of the January 2007 incident, Chevron informed Contra Costa Health Services’ Hazardous Materials Program399 (CCHMP) in a letter that the crude unit piping metallurgy had been upgraded following this incident as an inherently safer solution. However, the CSB learned that this upgrade was limited to only the immediate piping spool400 that failed. Cal/OSHA also did not require Chevron to update the crude unit PHA to address the findings from this incident. Under a safety case regulatory regime, the regulator would work with the company to improve its practices following such an incident. The company would also be required to update its safety case report to address these corrosion hazards and demonstrate how the company has reduced risks to ALARP.

The CSB also noted in its Chevron Interim Report that despite internal recommendations to replace the entire #4 sidecut piping with an inherently safer, more corrosion-resistant material of construction, Chevron’s 2006 Management of Change (MOC) analysis limited the application of those recommendations. Instead of replacing the entire piping segment identified by the original recommendation, the 2006 MOC considered only the replacement of a small section. Although the recommendation was intended to more broadly apply inherently safer materials of construction, the final implementation under the 2006 MOC limited the application of this more corrosion resistant

399 Contra Costa Health Services’ Hazardous Materials program is designed to respond to emergencies and monitor hazardous materials within Contra Costa County. See http://cchealth.org/hazmat/ (accessed April 17, 2013). CCHSHMP also implements the CalARP and ISO programs, which will be discussed in greater detail later on. 400 A piping spool is a small, removable section of piping. In some cases, a piping spool is installed or removed in order to provide a temporary connection or complete disconnection between two piping circuits.

Chevron Richmond Refinery Regulatory Report May 2014

79

metallurgy.401 As the mere completion of an MOC and the implementation of any action item satisfy the California PSM standard requirements, regardless of its adequacy or effectiveness, Cal/OSHA did not evaluate the MOC or cite Chevron for narrowing the scope of the MOC, despite its disregard of internal recommendations. Neither the California nor the federal PSM standards allow citations for inadequate MOCs. In addition, RAGAGEP does not apply to the MOC PSM element.

This can be contrasted with the safety case regulatory regime in the UK, where the HSE includes the adoption of inherently safer designs as an essential consideration for determining whether a duty holder has reduced risks to ALARP.402 The HSE also notes that the guidance to COMAH Regulation 4, (the COMAH General Duty provision) “describes the application of all measures necessary to reduce risk of a major accident to ALARP based on a hierarchical approach (inherent safety, prevention, control, mitigation).”403 5.1.2.3 Process Safety Indicators As the CSB has noted in its BP Texas City Investigation Report, Chevron Interim Report, and Section 4.5 of this report, process safety indicators are a significant element of process safety management systems and are critical for reducing process safety incidents. A major goal of process safety indicators is to drive continuous process safety improvement. Regulators can utilize these indicators to focus inspections, audits, and investigations.

Federally and in the state of California, neither the PSM standard nor the RMP rule require companies to utilize or report process safety indicators. Chevron voluntarily utilizes both leading and lagging indicators internally in its US petroleum refineries, in a system called Operational Excellence and Reliability Intelligence (OERI), which tracks 26 different process safety indicators. OERI was implemented in May 2009. However, Chevron is not required to report the status of its indicators to California regulators. Nor is Chevron held accountable to use the indicators to drive performance or continuous improvement. As a result, the CSB made a recommendation in its Chevron Interim Report to the California State Legislature to identify and require the reporting of leading and lagging process safety indicators to state and local regulatory agencies, with the goal of improving mechanical integrity and process hazard analysis performance at all California petroleum refineries, and preventing major chemical incidents. 5.1.2.4 Inspections As noted in Section 4.6, safety case regulators utilize preventative inspections and audits to monitor compliance with legislation and to ensure that the facility and its operations are consistent with information provided in the safety case. However, like federal OSHA, California regulations require Cal/OSHA to prioritize accident, complaint, and referral-based inspections over planned inspections. As such, Cal/OSHA’s inspection program of the nearly 1,700 PSM-regulated facilities in California,

401 As discussed in the Interim Report, only the section of piping downstream of the pumps was replaced with 9- Chrome. 402 HSE. The Safety Report Assessment Manual, Sections 8 to 15. p 30. http://www.hse.gov.uk/comah/sram/s8- 15.pdf (accessed October 30, 2013). 403 Ibid at 8.

Chevron Richmond Refinery Regulatory Report May 2014

80

including 14 petroleum refineries, 404 has been reactive in nature rather than proactive to maximize prevention. OSHA State Plan states405 were strongly encouraged but not required to implement the federal Petroleum Refinery NEP. Cal/OSHA did not adopt the NEP “because of its dedicated PSM Unit.”406 Between 2006 and August 6, 2012, the Cal/OSHA PSM District Office conducted only three planned inspections of the Chevron Richmond facility, totaling only 150 inspector hours of effort. Cal/OSHA has acknowledged that these were not PQV inspections, as envisioned in its mission statement and in the federal PSM compliance directive. None of these inspections resulted in citations or fines. According to statistics provided by OSHA, federal NEP refinery inspections conducted between 2007 and the end of 2011 required roughly 1,000 inspector hours each and resulted in an average of 11.2 violations and $76,821 in penalties per inspection. OSHA noted that hours spent on a typical federal refinery NEP inspection were 40 times greater than the average OSHA inspection. These numbers indicate a major disparity in thoroughness and comprehensiveness between the planned inspections conducted by Cal/OSHA and the NEP inspections conducted by OSHA and other OSHA State Plan States. The federal NEP, which represented a more robust and intensive inspection program, ended in 2011 due to the stated great demand on OSHA resources. 5.1.2.5 Workforce Participation Like the federal PSM standard, California’s PSM standard provides for workforce participation in a company’s process safety management program. 8 CCR §5189 (p) requires an employer to develop a written plan to “ensure employee participation in process safety management” including “consultation with employees and their representatives on the conduct and development of the elements of process safety management…”407 However, developing a written plan to satisfy the regulatory requirements does not ensure that workers and their representatives in practice are able to effectively participate in a company’s process safety management systems. In its investigation of the Chevron incident, the CSB noted that the Chevron Richmond Refinery workforce and its representatives, the United Steelworkers (USW), had expressed concerns regarding sulfidation corrosion and broader workplace safety issues, but were not consistently listened to by Chevron managers, and their concerns regarding corrosion were not adequately acted upon. In November 2011, Cal/OSHA investigated a complaint of unsafe working conditions during the fourth quarter Richmond Lube Oil Plant (RLOP) turnaround at the Richmond Refinery. The RLOP receives feedstock from the crude unit where the August 6th incident occurred and has similar sulfidation corrosion concerns. During the shutdown of the RLOP, a fire occurred at one of the RLOP furnaces. According to Cal/OSHA’s inspection report, Chevron employees told Cal/OSHA that “OPERATORS GET IGNORED.” Many of the employees were concerned about increased corrosion they were finding during the turnaround, and believed that increased temperatures and throughput rates had an adverse effect on

404 Also see the California Labor Code Sections 6309 to 6315 (The California Occupational Safety and Health Act of 1973). 405 Section 18 of the Occupational Safety and Health Act of 1970 encourages States to develop and operate their own job safety and health programs, referred to informally as an OSHA State Plan. OSHA approves and monitors State plans and provides up to 50 percent of an approved plan's operating costs. 406 Department of Industrial Relations, Division of Occupational Safety and Health, California, Process Safety Management District Office. Mission Statement: Goals Reached in 2011 & Strategic Plan for 2012. 407 8 CCR §5189(p)(1) (2012).

Chevron Richmond Refinery Regulatory Report May 2014

81

equipment integrity. According to the interview notes, many operators had raised issues of corrosion in the RLOP to higher level supervisors to no avail; according to one, if you raise an issue a couple of times, “you get labeled a ‘pest.’” The CSB has not identified evidence indicating that Cal/OSHA took further action to respond to these concerns, and Cal/OSHA did not issue any citations as a result of its investigation.408 Post-incident, significant sulfidation corrosion was found in the RLOP and piping and equipment were replaced. The CSB found other significant evidence that increased workforce participation could have reduced the likelihood that unchecked corrosion would lead to the August 2012 incident. As discussed in the CSB’s Interim Report on the Chevron incident, Chevron technical staff has considerable knowledge and expertise regarding sulfidation corrosion, specifically with respect to corrosion rate variations caused by differing silicon concentration in carbon steel piping. Chevron employees have authored industry papers on sulfidation corrosion and had significant influence in the development of the industry sulfidation corrosion recommended practice, API RP 939-C. In 2009, Chevron Energy Technology Company (Chevron ETC)409 created an internal document on the subject of sulfidation corrosion. Chevron ETC metallurgists released a formal report dated September 30, 2009 (nearly 3 years prior to the incident) to Chevron refinery-based reliability managers and chief inspectors entitled Updated Inspection Strategies for Preventing Sulfidation Corrosion Failures in Chevron Refineries. Sulfidation experts explained in the Chevron ETC report that, “[u]ntil now, Chevron has not directly addressed the risk of low Si[licon] carbon steel…”410 and that the report introduced a program that “seeks to close these gaps, and to maximize the effectiveness of our inspection.” The report clearly indicates that Chevron understood both the potential consequence and the high likelihood of a rupture or catastrophic failure from sulfidation corrosion and calls out Chevron’s need for action. The Chevron ETC report specifically recommended that inspectors perform 100 percent component inspection on high temperature carbon steel piping susceptible to sulfidation corrosion. However, this 100 percent component inspection program was not implemented at the Richmond refinery prior to the August 6, 2012, incident. The Chevron ETC report defined a priority ranking system to help focus the inspection implementation efforts. The process conditions of the 4-sidecut pipe placed it in the highest priority for inspection. Chevron ETC technical experts issued a corporate newsletter in 2010 that again warned of the potential consequence of sulfidation failures. In this newsletter, the 100 percent component inspection recommendation from the 2009 report was reiterated for piping systems such as the crude unit 4-sidecut piping. The newsletter stated: Sulfidation corrosion failures … are of great concern because of the comparatively high likelihood of ‘blowout’ or catastrophic failure. This typically happens because corrosion occurs at a relatively uniform rate over a broad area, so a pipe can get progressively thinner until it actually bursts rather than leaking at a pit or local thin area. In addition, the

408 Post-incident, there were significant mechanical integrity improvements and piping replaced in the RLOP unit. 409 The Chevron Energy Technology Company is a separate business unit within the Chevron Corporation that provides technology solutions and technical expertise for Chevron operations worldwide. See http://richmond.chevron.com/home/aboutchevronrichmond.aspx (accessed April 4, 2013). 410 A 2003 corporate technical newsletter recommended 100 percent component inspection of carbon steel piping susceptible to sulfidation corrosion following a 2002 Chevron Salt Lake City sulfidation corrosion incident.

Chevron Richmond Refinery Regulatory Report May 2014

82

process fluid is often above its auto ignition temperature. The combination of these factors means that sulfidation corrosion failures frequently result in large fires. Chevron and the industry have experienced numerous failures from this mechanism and recent incidents have reinforced the need for revised inspection strategies and a robust PMI (Positive Materials Identification) program. The Chevron ETC 100 percent component inspection recommendation for high risk piping systems, established in 2009, was not implemented at Richmond, and the thin-walled low silicon 4-sidecut piping component remained in service until it catastrophically failed on August 6, 2012. Chevron and Chevron ETC metallurgists, materials engineers, and piping inspectors had expertise regarding sulfidation corrosion. They educated personnel and advocated for identification and control of damage mechanisms, including sulfidation corrosion. However, they had limited practical influence to implement their recommendations. These individuals did not participate in the crude unit PHA and did not affect decisions concerning control of sulfidation corrosion during the crude unit turnaround process.411 Despite the history of sulfidation corrosion incidents and the recommendations by Chevron’s workforce to implement better inspection methodologies, Cal/OSHA did not evaluate these recommendations or determine whether Chevron management ensured that the hazards of this damage mechanism were addressed and mitigated in Chevron’s PHAs. In addition, Cal/OSHA issued no citations to Chevron post- incident regarding the failure to address sulfidation corrosion in its crude unit PHA. Finally, when Chevron employees raised concerns, Cal/OSHA did not effectively address them. The examples highlighted in this section speak to the need for California to develop more effective regulation similar to the UK legislation discussed in Section 4.4, to ensure strong workforce involvement in health and safety matters at petroleum refineries. This will not only help prevent incidents such as the one that occurred at Chevron, but it will also help improve communication and ensure that workers are represented in the decisions that affect them. 5.1.2.6 Funding and Regulator Competency Cal/OSHA has not received sufficient funding to employ a well-staffed, multi-disciplinary team capable of conducting thorough inspections of PSM-covered facilities in California. This is apparent when examining the lack of preventative, planned inspections of petroleum refineries being conducted by the PSM team in the state. In order for a safety regulatory regime to successfully regulate with the goal of major accident prevention, there must be a technically competent, well-resourced regulator in place to sufficiently review, scrutinize, and challenge the hazard identification and evaluation that has been conducted and controls that have been put in place to reduce risk, to help drive continuous improvement and ensure that risks are being controlled. It is not an acceptable outcome for society that petroleum refineries with the potential for catastrophic accidents be inspected only after an accident occurs or a complaint is filed.

411 The turnaround process includes both the planning stage prior to the shutdown and the activities staged during the shutdown.

Chevron Richmond Refinery Regulatory Report May 2014

83

Compensation is one important factor for recruiting and retaining technically competent personnel. The CSB found that California regulators are significantly less compensated when compared to their industry counterparts. Based on information Chevron provided to the CSB, the average annual salary of refinery personnel who would interact with a California regulator performing an audit or safety inspection is $187,630. Table 2 below provides the 2012 salaries of California regulatory personnel that the CSB determined would likely perform a safety inspection or a hypothetical safety case assessment. These figures indicate a substantial compensation gap between the regulator and the regulated. A Cal/OSHA PSM team of associate safety engineers receive an average annual salary that is 46 percent lower than the refinery employees they would likely interface with during an inspection. EPA RMP inspectors receive an annual salary that is 33 percent lower than their facility counterparts and Contra Costa County accidental release prevention engineers and their supervisor are paid 48 percent less than these industry personnel.412

Entity Average Annual Salary Refinery Personnel $187,630 Cal/OSHA $100,536 Contra Costa County $96,875 EPA $125,000 Table 2. Average 2012 salary for individuals selected by the CSB as representative of the professional staff within each California regulator and of the refinery professional staff who interface with the regulators regarding audits or safety inspections at the Chevron Richmond Refinery. As noted in the introduction of this report, the California State Legislature approved a 2013-2014 state budget bill (AP 110) that allows the California Department of Industrial Relations to charge state petroleum refineries a fee by March 31, 2014, to support an increase in funding and to pay for at least 15 new positions in Cal/OSHA’s PSM Unit.413 The CSB considers this to be a positive step towards improving process safety management in the state of California, as it will provide the team the opportunity to conduct more thorough inspections. However, it is imperative that these additional inspectors have the skills, knowledge, and experience to provide sufficient direct oversight over PSM- covered facilities. Despite the additional funding, there remains a longstanding salary cap on associate safety engineers within Cal/OSHA. This will continue to make it difficult for Cal/OSHA to consistently attract or retain the necessary talent and expertise to effectively oversee these facilities.

412 Compensation information is based on salary only. It does not take into account non-salary information such as bonuses, retirement programs, or benefit programs. 413 See http://www.caltax.org/homepage/062113_Legislature_Approves.html (accessed July 9, 2013).

Chevron Richmond Refinery Regulatory Report May 2014

84

  1. 2

U.S. Environmental Protection Agency According to the EPA OIG, as of May 2012, only eight states and five local agencies had accepted full or partial RMP program delegation from EPA.414 As such, EPA regions directly implement the RMP program in most states. As no state agency has requested or received delegation to implement the RMP program within EPA Region 9, the federal EPA regional office is responsible for RMP program implementation for California as well as Arizona, Nevada, Hawaii, the Pacific Islands, and 148 Tribal Nations. 5.2.1 Risk Management Plan (RMP) Program As of March 2013, there were 1,137 RMP-covered facilities in Region 9: 957 in California; 118 in Arizona; 42 in Nevada; 16 in Hawaii; and four in Guam.415 The Chevron Richmond Refinery has many processes covered by the RMP rule, including Program 3 processes, 416 such as the crude unit. As such, Chevron is required to submit an RMP every five years to EPA Region 9, and EPA is expected to audit the facility against this RMP to ensure compliance. According to Chevron’s most recent RMP submitted to EPA Region 9 in October 2011, its crude unit contained 400,000 pounds of a flammable mixture of propane, pentane, butane, ethane, and methane, well above the 10,000-pound threshold quantity for flammables.417 EPA Region 9 employs four full-time and two part-time RMP inspectors to implement the RMP program for the roughly 1,100 RMP-covered facilities in the entire region. Region 9 staff informed the EPA OIG that to most effectively utilize their resources, they “place an additional focus on facilities in States, such as Arizona, that do not have their own risk management or accident prevention programs.418 The EPA’s mandates to conduct a certain number of inspections at high-risk facilities plus a lack of resources and staffing prevent the inspectors from fully auditing many of the petroleum refineries in each state; thus, the inspectors aim to visit each refinery every three years, where they pick one process to evaluate for two to three days. These inspectors target their inspections towards a specific industry issue during these visits. For example, when they last inspected Chevron in 2010, the inspectors focused on the issue of high temperature hydrogen attack (HTHA) due to the Tesoro incident that occurred in April 2010.419

414 EPA OIG. Improvements Needed in EPA Training and Oversight for Risk Management Program Inspections; March 21, 2013; p 2. 415 US EPA Region 9 Emergency Prevention and Preparedness Program; Stanislaus County Powerpoint; March

  1. See http://www.condorearth.com/files/08-Enforcement_Priorities-Mary_Wesling.pdf (accessed May 14,

2013). 416 Processes not eligible for Program 1 and either subject to OSHA’s PSM standard or classified in one of ten specified North American Industrial Classification System (NAICS) codes are placed in Program 3, which imposes OSHA’s PSM standard as the prevention program as well as additional hazard assessment, management, and emergency response requirements. 417 EPA List of Regulated Chemicals and Threshold Quantities for RMP program available at http://www.epa.gov/R5Super/cepps/pdfs/rmp-listed-chemicals-200708.pdf (accessed May 17, 2013). 418 California has its own RMP program, called CalARP. See EPA OIG. Evaluation Report: EPA Can Improve Implementation of the Risk Management Program for Airborne Chemical Releases; February 10, 2009; p 23. 419 On April 2, 2010, a heat exchanger ruptured due to high temperature hydrogen attack, resulting in seven worker fatalities at the Tesoro Anacortes Refinery in Anacortes, Washington. The CSB is set to release its investigation report on this incident near the end of January 2014.

Chevron Richmond Refinery Regulatory Report May 2014

85

  1. 2.2

Implementation of the RMP Program In order for a safety regime to function well, there must be a competent, well-resourced regulator in place to implement the regime. However, the EPA Region 9 RMP group is extremely understaffed and under- resourced, as there are only six full-time inspectors to cover over 1,100 facilities across many states. Instead of fully inspecting or auditing petroleum refineries, the group is able to inspect one process at each refinery for two to three days every three years, which makes fully inspecting these facilities or auditing against the RMPs submitted by these facilities impossible. In addition, this group has other responsibilities beyond the RMP program, including the management of contracts, emergency prevention and preparedness training and outreach, and reporting violations under the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA). The CSB has learned that because this group has such limited resources, it hopes to delegate RMP inspection authority to other agencies throughout the region, as long as it maintains power to enforce violations. Like the federal and California PSM standards, the RMP regulations provide for workforce participation420 and require facilities to prepare a written plan of action regarding employee participation. It is the RMP program’s policy to invite employee representatives to participate in all parts of onsite inspections. EPA Region 9 RMP staff told the CSB, however, that the limited amount of time they were able to spend onsite at refineries made speaking with facility inspectors and operators a difficult task. They expressed that a lesson learned from the Chevron incident was that EPA RMP inspectors should commit more time onsite during facility inspections and audits, which will allow them more time to speak with workers to gain a better insight into how any issues within the facility are being addressed and resolved.421 As mentioned above, EPA guidance on the RMP program states that the owner or operator’s duty to “prevent accidents and ensure safety at [their] source…” may require steps to be taken “beyond those specified in the risk management program rule.”422 While this principle appears to be similar to ALARP requirements of the safety case, in practice this is not required, and whether this is done is not subject to regulation or review. Similar to the PSM standard, RMP regulations require each facility with Program 3 processes to conduct a PHA as part of its prevention program that is “appropriate to the complexity of the process…and[] identify, evaluate, and control the hazards involved in the process.”423 However, these regulations do not require facilities to include these analyses in the RMPs they submit to EPA. Rather, facilities with Program 2 or 3 processes are only required to include in the RMP very high-level, simplified information on their prevention programs and their PHAs. The Chevron Richmond Refinery’s most recent RMP submission from October 2011 included the following information on the PHAs for each relevant process: the date of the last PHA for that process; what technique was used; what major hazards were identified; what process controls were in use (i.e. automatic shutoffs, interlocks, alarms, emergency power); what mitigation systems were in use (i.e. dikes, fire walls, water curtain); what monitoring/detection systems were in use (i.e. process area detectors); date of the most recent review or

420 See 40 CFR §68.83 (2000). 421 This need for greater interface with worker is a professional opinion by EPA staff, but has not resulted in EPA policy modifications to ensure effective worker input in future inspections. 422 EPA Office of Solid Waste and Emergency Response. General Guidance on Risk Management Programs for Chemical Accident Prevention (40 CFR Part 68); March 2009; p 7-7. See http://www.epa.gov/osweroe1/docs/chem/Toc_final.pdf (accessed May 14, 2013). 423 40 CFR §68.67(a) (1998).

Chevron Richmond Refinery Regulatory Report May 2014

86

revision of training programs; and maintenance. Chevron included one paragraph entitled “E.5. General Accidental Release Prevention Program,” which stated that PSM is applied to the entire refinery, and the PSM program is documented in Refinery Instruction (RI)-360, “Richmond Refinery PSM Policy.” No additional information or analysis could be located concerning the identification or control of hazards, or risk reduction, as, unlike the safety case model, there is no requirement for the company to demonstrate to the regulator that it is effectively ensuring that the safety systems are functioning as intended. Under the EPA RMP program, there is no regulatory requirement to reduce risks to ALARP. In addition, there is no requirement to submit to the regulator detailed information relating to risk reduction or hazard assessments. Finally, the Region 9 EPA RMP inspection team does not have the resources to fully audit petroleum refineries and other high hazard facilities subject to the RMP program. As a result, the EPA RMP program is not comprehensive or rigorous enough to control major accident hazards and reduce risks. Instead, facilities submit high-level summary information providing evidence that the activity- based requirements contained within the RMP regulations have been completed by the facility. 5.3 Unified Program Chevron’s Richmond refinery was also subject to process safety regulatory requirements at the county and city level. The facility had to adhere to additional requirements above the PSM and RMP regulations, but these requirements were not sufficient to prevent the Chevron incident. The following sections will discuss those county and city requirements. In 1993, Chapter 418, Statutes of 1993 (Senate Bill 1082) established Chapter 6.11 of the California Health and Safety Code (HSC), which required the Secretary of the California Environmental Protection Agency (Cal/EPA) to adopt regulations creating a “unified hazardous waste and hazardous materials management” regulatory program, or Unified Program, by January 1, 1996, to consolidate and make consistent six existing hazardous materials and hazardous waste programs within the state.424 The Secretary of Cal/EPA was charged with ensuring that the Unified Program was established and implemented by a Certified Unified Program Agency, or CUPA, in all counties in California. Cal/EPA adopted the Unified Program regulations under Title 27, Division 1 of the California Code of Regulations, which integrated six existing programs: the Hazardous Waste Generator and Onsite Hazardous Waste Treatment programs; the Aboveground Storage Tank program; the Underground Storage Tank program; the Hazardous Materials Release Response Plans and Inventory program; the California Accidental Release Prevention (CalARP) program; and the California Uniform Fire Code.425 The CalARP program, which was created through Assembly Bill AB1889 with the goal of major accident prevention, will be discussed at greater length below. There are currently 83 CUPAs in the state of California that implement the Unified Program at a local level.426 5.3.1.1 Contra Costa County Hazardous Materials Programs The Chevron Richmond Refinery is located in the City of Richmond, within Contra Costa County. The local CUPA responsible for implementing the Unified Program in all areas of the country is the Contra

424 California Health and Safety Code §25404(b) (1993). Also see http://www.calepa.ca.gov/cupa/Reports/2002/ReimbAcct.pdf (accessed May 16, 2013). 425 27 CCR §15100 (a)(1) through (6) (1994). 426 See http://www.calepa.ca.gov/cupa/Documents/2012/FactSheet.pdf (accessed May 16, 2013).

Chevron Richmond Refinery Regulatory Report May 2014

87

Costa Health Services’ Hazardous Materials Programs (CCHMP).427 CCHMP is responsible for implementing the Unified Program in all areas of Contra Costa County. CCHMP implements two programs that are relevant to this investigation: the CalARP program and the City of Richmond Industrial Safety Ordinance (RISO). CCHMP also implements the county’s own Industrial Safety Ordinance (ISO), which covers seven facilities. CCHMP has five full-time engineers, known as accidental release prevention engineers, who are responsible for implementing these programs for the county. While all have technical degrees in engineering, only two of these engineers have past refinery experience. 5.3.1.1.1 CalARP The California Health and Safety Code Article 2 (Chapter 6.95, Sections 25531 – 25543.3) was amended effective January 1, 1997, to implement EPA’s RMP program at the state level through the creation of the CalARP program regulations. Modeled after EPA’s RMP program and California’s Risk Management and Prevention Plan, which was enacted in 1986, the CalARP regulations (Title 19, Chapter 4.5 of the CCR) were implemented with the goal of preventing accidental releases of substances that can cause serious harm to the public and the environment, minimizing damage caused by a release, and to satisfy community right-to-know laws.428 California is one of at least three states that implement a state RMP program without delegation of the federal program from EPA.429 The CalARP regulations, including PHA requirements, are essentially duplicative in nature to EPA’s RMP program, with a few exceptions: the list of toxic chemicals covered is 276 instead of 77; the threshold quantities of some chemicals are smaller; CalARP requires a seismic analysis; and there is more interaction with the public and other agencies.430 The CalARP regulations require that businesses that produce, handle, process, distribute, or store certain chemicals over a certain threshold quantity develop a Risk Management Plan (RMP) and submit the RMP to a local CUPA for review. Like the EPA RMP program, facilities with a Program 3 process must develop a management system that includes a PHA and emergency response program.431 State oversight authority and responsibility for the CalARP program is with the California Emergency Management Agency.432 The CalARP regulations apply to roughly 45 facilities in Contra Costa County, including the Chevron refinery in Richmond. Each covered facility is required to submit an updated RMP to CCHMP at least once every five years.433 The group of CCHMP engineers reviews these plans and is required to

427 Contra Costa County’s Hazardous Materials program is responsible for responding to emergencies and monitoring hazardous materials in Contra Costa County. It is the duty of CCC to safeguard the Contra Costa County ecosystem from the release of hazardous materials and other pollutants. For more information see http://cchealth.org/hazmat/ (accessed May 21, 2013). 428 Information available at http://www.calema.ca.gov/HazardousMaterials/Pages/Accidental-Release-Prevention- (CalARP).aspx (accessed May 16, 2013). 429EPA OIG. Evaluation Report: EPA Can Improve Implementation of the Risk Management Program for Airborne Chemical Releases; February 10, 2009; p 20. 430 Information on differences between EPA’s RMP program and CalARP available at http://cchealth.org/hazmat/differences-rmp-calarp-iso.php (accessed May 16, 2013). 431 22 CCR §2735.5(f) (2004). 432The California Emergency Management Agency is responsible for the coordination of overall state agency response to major disasters in support of local government. For more information see http://www.calema.ca.gov/Pages/default.aspx (accessed May 21, 2013). 433 22 CCR §2745.10(a)(1) (2004).

Chevron Richmond Refinery Regulatory Report May 2014

88

“periodically audit RMPs”434 against the regulations to ensure compliance. This group has told the CSB that it audits each facility at least once every three years. It last audited Chevron in February 2011, and has been conducting another audit in October and November 2013. Although CCHMP is authorized to issue enforcement actions for violations uncovered during facility audits, in practice CCHMP engineers issue “ensure” action items that list the deficiencies and recommend improvements. They then work with the facility to make sure that these action items are implemented. CCHMP has rarely issued fines or citations to facilities for violations. If the engineers identify other gaps or areas for improvement that are not actual regulatory violations, they can issue “consider” action items, which are essentially suggestions to the facility for improvements that are not technically required to be implemented by the regulation. Whether these types of action items are issued is dependent upon the knowledge and experience of the engineer conducting the audit. Once CCHMP engineers have completed the audit, CCHMP issues a final audit report on the facility, which they also supply to Cal/OSHA’s PSM District Office and the EPA Region 9 RMP group. 5.3.1.1.2 Industrial Safety Ordinance The Contra Costa County Industrial Safety Ordinance (ISO) became effective January 15, 1999. Adopted as County Ordinance Chapter 450-8, the ISO expands on the CalARP program in Contra Costa County for facilities meeting the following criteria: 1) the facility is within an unincorporated area of the County; 2) the facility is either a petroleum refinery or chemical plant; 3) the facility is required to submit a Risk Management Plan (RMP) to the EPA and the Contra Costa County Health Service; and 4) the facility has at least one Program 3 process.435 Seven of the 45 CalARP facilities in the county are currently required to comply with the ISO requirements. The ISO was adopted to improve industrial safety by, among other things, requiring more comprehensive coverage of the whole facility rather than only certain processes; providing review, inspection, auditing and safety requirements more stringent than are currently in effect; requiring the development and implementation of a human factors program; and preventing and reducing the number, frequency and severity of accidental releases in Contra Costa County.436 Facilities subject to the ISO are essentially required to treat every process as subject to the CalARP Program 3 prevention program requirements. Covered facilities have additional requirements as well, including developing and implementing a human factors program, considering inherently safer technologies and systems for new and existing facilities or processes, submitting a safety plan to CCHMP, and conducting a Management of Organizational Change (MOOC) prior to changes in permanent staffing levels or reorganization in operations, maintenance, health and safety, or emergency response.437

434 22 CCR §2775.2(a) (2004). 435 See http://cchealth.org/hazmat/pdf/iso/2006_iso_official_code_complete.pdf (accessed January 13, 2014). 436 County Ordinance Chapter 450-8.004(a)(1) through (10) (2006). http://cchealth.org/hazmat/pdf/iso/2006_iso_official_code_complete.pdf (accessed January 13, 2014). 437 Information available at http://cchealth.org/groups/hazmat/industrial_safety_ordinance_risk_management.php (accessed May 22, 2013).

Chevron Richmond Refinery Regulatory Report May 2014

89

  1. 3.1.1.3 City of Richmond Industrial Safety Ordinance

On December 18, 2001, the City of Richmond adopted an Industrial Safety Ordinance (RISO) under Municipal Code Chapter 6.43 that was almost identical to the ISO. In February 2013, the City of Richmond Council amended the RISO to make it equivalent to the ISO. Chevron is one of two facilities subject to RISO requirements. Pursuant to an agreement with the City of Richmond, CCHMP implements and enforces the RISO within the city. Like the ISO, the RISO requires that a covered facility submit a safety plan to CCHMP that includes safety elements such as process safety information (PSI), operating procedures, mechanical integrity, employee participation, and management of change (MOC).438 CCHMP has posted a Safety Plan Guidance Document on its website to assist facilities in developing these plans. Each facility is also required to comply with safety requirements including performing PHAs, and must include a description of the manner of compliance with these in the safety plan.439 In performing a PHA, facilities are required to address the hazards of the process, identify any previous incident, identify controls applicable to the hazards, and identify consequences of failure of those controls, human factors, and a qualitative evaluation of a range of possible safety and health effects of failure of controls.440 The CCHMP engineers are required to review each facility’s safety plan as well as audit each facility to determine compliance with ISO or RISO. CCHMP engineers conduct the CalARP and ISO/RISO audits concurrently at each covered facility. CCHMP generally audits each facility once every three years. To aid in the auditing process, CCHMP engineers have entered all the CalARP program requirements into a database. They have taken each of these requirements and turned them into questions. When the engineers go onsite, they perform three main functions: 1) they identify and review any policy statement that directs how people should handle a particular piece of equipment; 2) they identify and review records of procedures, such as MOCs and permits; and 3) they randomly select and interview individuals about their familiarity with various aspects of different programs. If the engineers find a regulatory deficiency, they issue an ensure action item to the facility. Once the engineers have completed their facility audit, they issue a preliminary determination to the facility. The facility has 90 days to review the draft and provide a proposed remedy with specifics on how they will fix each deficiency, and the timeline. Once the report is finalized it goes out for public comment. Following public comment, it is issued to the facility and provided to Cal/OSHA’s PSM District Office and the EPA Region 9 RMP group. 5.3.1.2 Analysis Chevron submitted its most updated safety plan to CCHMP on February 25, 2013. Section 3.12 of the plan discusses PHAs and Action Items. Under this section, Chevron lists eight objectives of its PHAs, including identifying possible failures or releases, evaluating potential consequences, and proposing recommendations that would reduce the risks. Chevron also discusses its possible justifications for declining recommendations from PHAs, including the fact that an alternative measure would be sufficient, and that the recommendation may be infeasible. There was no additional information or

438 Richmond Municipal Code Section 6.43.090 (a) (2013). 439 Ibid at Sections (a) through (e) (2013). 440 Ibid at (d) (2013).

Chevron Richmond Refinery Regulatory Report May 2014

90

analysis contained in this section concerning the identification or control of hazards, or risk reduction, as there is no requirement to do so. The RISO and CalARP regulations require that PHAs list controls and possible consequences of failure of those controls, but there is no specific requirement to include evaluations of the safeguards and controls in the PHA. As CCHMP engineers are only required to audit against the regulatory requirements, they would only examine the evaluation of safeguards if such an evaluation were performed and documented in the facility’s PHAs. As noted previously, Chevron’s most recent crude unit PHA ineffectively listed qualitative safeguards for corrosion and mechanical integrity. While CCHMP engineers are able to issue “consider” action items to the facility recommending actions above and beyond regulatory requirements, CCHMP engineers did not do this regarding Chevron’s Crude Unit PHA or its evaluation of safeguards. After reviewing CCHMP’s most recent audit of Chevron, the CSB could find nothing referring to sulfidation corrosion, reduction of risk, or safeguard evaluation. While CCHMP is able to utilize these “consider” action items to encourage facilities to go above and beyond regulatory requirements to reduce risk, CCHMP engineers have stated to the CSB that they do not make sufficient use of this mechanism. Rather, they tend to audit against the existing regulatory requirements to ensure compliance. Unlike the safety case regulatory approach, which requires a reduction of risk to ALARP or equivalent, facilities covered by RISO or ISO are only required to “consider [emphasis added] the use of inherently safer systems in the development and analysis of mitigation items resulting from a process hazard analysis [PHA] and in the design and review of new processes and facilities.”441 Despite multiple internal recommendations to replace its piping due to the risk of sulfidation corrosion, Chevron failed to replace the piping prior to the incident with an inherently safer material. Again, the CSB has not found evidence that CCHMP effectively encouraged Chevron to go above and beyond regulatory requirements by utilizing inherently safer systems to reduce risk. As emphasized repeatedly in this report, a regulatory regime is only as strong as its regulators, and must employ individuals with the requisite skills, knowledge, and experience to provide sufficient oversight over facilities. In the case of CCHMP, there are only five engineers for nearly 45 facilities in the county, and only two have previous refinery experience.442 In addition, while the CCHMP is funded mostly through CUPA fees, ISO fees, and other means of cost recovery, the engineers are part of a bargaining unit and their salaries are paid through the county’s general fund, which has experienced annual budget reductions in the millions.443 This has unnecessarily resulted in a decrease in the CCHMP engineers’ salaries and has made it extremely difficult for CCHMP to fill a current position that has been open over three years because of its inability to offer competitive salaries to attract its engineers. Overall, CCHMP suffers from a lack of resources and funding, limiting its ability to hire additional highly qualified staff to oversee the petroleum refineries in Contra Costa County.

441 City of Richmond Municipal Code §6.43.050(g) (February 5, 2013). 442 Two of the other engineers have chemical plant experience and have led or participated in refinery compliance audits in the past ten years.

Chevron Richmond Refinery Regulatory Report May 2014

91

  1. 0 Conclusion

This report has focused on several aspects of the safety case regulatory approach that the CSB believes differentiate it from existing US and California process safety regulations: safety responsibility on the part of the facility, including a written case for safety; continuous risk reduction to ALARP; adaptability and continuous improvement; active workforce participation; the effective use of process safety indicators that drive performance; regulatory assessment, verification, and intervention; and an independent, competent, well-funded regulator. These attributes together enable industry and the regulator to ensure that facilities are developing and implementing comprehensive, robust safety management systems to prevent major accidents. Implementation of the safety case regulatory regime in California for petroleum refineries will require a commitment of extensive resources to fund a regulator that has the requisite skills, knowledge, and experience to ensure petroleum refineries in the state continually assess their practices and reduce risks to ALARP. However, the CSB believes that effective implementation of this regulatory approach will achieve greater major accident prevention in California and, in the process, provide greater protection for its workers and the public. The safety case provides the adaptability necessary to keep current with improving standards and advancing technology, without requiring lengthy and often unproductive rulemaking on the part of the regulator. With the safety case regulatory regime in place, a competent regulator will independently ensure that California refineries have taken all practical measures that can be reasonably taken to reduce risks. For example, the regulator would have the ability to work with these facilities to implement recommendations and lessons learned from significant petroleum refinery incidents throughout the world without requiring extensive rulemaking or legislation, as regulators have done post-incident in the UK, Norway, and Australia. If questions remain regarding the safety case regulatory regime after reading this report, see Appendix C for additional information and discussion. The safety case regulatory regime will require a full commitment and extensive effort by the California legislature, regulators, and California petroleum refineries. However, the CSB believes that this effort is necessary to ensure that California, like other regions around the world, is effectively managing process safety and risk, and in the process, preventing major accidents such as the August 6, 2012, Chevron pipe rupture and hydrocarbon release.

Chevron Richmond Refinery Regulatory Report May 2014

92

  1. 0 Recommendations

Pursuant to its authority under 42 U.S.C. §7412(r)(6)(C)(i) and (ii), and in the interest of promoting safer operations at California petroleum refineries and protecting workers and communities from future accidents, the CSB makes the following safety recommendations: California State Legislature, Governor of California 2012-03-I-CA-R21 Develop and implement a step-by-step plan to supplement the existing process safety management regulatory framework for petroleum refineries in the state of California with a more rigorous safety management regulatory framework based on the principles of the “safety case” type regulatory regime in use in countries such as the United Kingdom, Australia, and Norway, and as described in this report, with the following minimum components: a. A case for safety written by the duty holder that includes a systematic analysis and documentation of all major hazards and effective control methods implemented to reduce those risks as low as reasonably practicable (ALARP); b. A thorough review of the safety case report by technically competent regulatory personnel that requires modifications and improvements to the document as necessary prior to acceptance; c. Audits and preventative inspections by the regulator to verify effective implementation of safety case elements; d. A risk management approach that requires analysis and effective implementation of safeguards, using the hierarchy of controls, to protect people and the environment from major accident hazards. The effectiveness of the safeguards will be demonstrated through the use of leading and lagging process safety indicators; e. Ability to adapt and implement safety requirements in response to newly identified hazards, advances in technology, lessons learned from major accidents, and improved safety codes without the need for new rule-making; f. Determines when new or improved industry standards and practices are needed and initiates programs and other activities such as forums to prompt the timely development and implementation of such standards and practices; g. Uses a tripartite model where the regulator, the company, and workers and their representatives play an equal and essential role in the direction of preventing major accidents; h. A regulatory model and accompanying guidance based on the UK’s The Safety Representatives and Safety Committees Regulations 1977 and the Health and Safety (Consultation with Employees) Regulations 1996, which set out the legal framework for the rights and responsibilities of workers and their representatives on health and safety-related matters, and the election of safety representatives and establishment of safety committees to serve health and safety-related functions. The elected representatives should have a legally recognized

Chevron Richmond Refinery Regulatory Report May 2014

93

role that goes beyond consultation in activities such as the development of the safety case report, process hazard analysis, management of change, incident investigation, audits, and identification and effective control of hazards. The representatives should also have the authority to stop work that is perceived to be unsafe or that presents a serious hazard until the regulator intervenes to address the safety concern.444 Workforce participation practices should be documented by the duty holder and submitted to the regulator; i. Requires reporting of information to the public to the greatest extent feasible such as a summary of the safety case report, the process hazard analysis, a list of safeguards implemented and standards utilized to reduce risk, and process safety indicators that demonstrate the effectiveness of the safeguards and management systems;445 j. An independent, well-funded, well-staffed, technically competent regulator; and k. A compensation system to ensure the safety case regulator has the ability to attract and retain a sufficient number of employees with the necessary skills and experience to ensure regulator technical competency. Periodically conduct a market analysis and benchmarking review to ensure the compensation system remains competitive with California petroleum refineries.

2012-03-I-CA-R22 Work with the regulator, the petroleum refining industry, labor, and other relevant stakeholders in the state of California to develop and implement a system that collects, tracks, and analyzes process safety leading and lagging indicators from operators and contractors to promote continuous safety improvements. At a minimum, this program shall: a. Require the use of leading and lagging process safety indicators to actively monitor the effectiveness of process safety management systems and safeguards for major accident prevention. Include leading and lagging indicators that are measureable, actionable, and standardized. Require that the reported data be used for continuous process safety improvement and accident prevention; b. Analyze data to identify trends and poor performers and publish annual reports with the data at facility and corporate levels; c. Require companies to publicly report required indicators annually at facility and corporate levels; d. Use process safety indicators (1) to drive continuous improvement for major accident prevention by using the data to identify industry and facility safety trends and deficiencies and (2) to determine appropriate allocation of regulator resources and inspections; and e. Be periodically updated to incorporate new learning from world-wide industry improvements in order to drive continuous major accident safety improvements in California.

444 See Regulations Relating to Health, Safety and the Environment in the Petroleum Activities and at Certain Onshore Facilities (The Framework Regulations) Section 35. http://www.ptil.no/framework- hse/category403.html#_Toc357595266 (accessed April 14, 2014). 445 Certain information such as the process hazard analysis may contain trade secret or confidential business information that would have to be identified and protected from public disclosure.

Chevron Richmond Refinery Regulatory Report May 2014

94

The Chemical Facility Safety and Security Working Group and the Occupational Safety and Health Administration 2012-03-I-CA-R23 This report highlights significant advantages of the safety case regime over the existing Process Safety Management standard to prevent potentially catastrophic chemical accidents that are relevant to OSHA’s response to Executive Order (EO) 13650. In the development of the OSHA EO response, incorporate a written plan that includes the evaluation of issues raised from the findings, conclusions and recommendations in this report concerning the safety case regime.

Chevron Richmond Refinery Regulatory Report May 2014

95

References

Australian Safety and Compensation Council. Major Hazard Facilities Annual Situation Report; 2004. http://www.safeworkaustralia.gov.au/sites/SWA/about/Publications/Documents/475/MHFAnSituationRe port_2004.pdf (accessed May 8, 2013).

Baker, J. The Report of the BP U.S. Refineries Independent Safety Review Panel, 2007.

Buncefield Major Incident Investigation Board. Recommendations on the design and operation of fuel storage sites; March 2007. http://www.buncefieldinvestigation.gov.uk/reports/recommendations.pdf (accessed May 21, 2013).

Center for Chemical Process Safety (CCPS). Guidelines for Developing Quantitative Safety Risk Criteria; August 2009.

Center for Chemical Process Safety (CCPS). Guidelines for Process Safety Metrics; October 2009.

Center for Chemical Process Safety (CCPS). Guidelines for Risk Based Process Safety; March 2007.

Center for Chemical Process Safety (CCPS). Inherently Safer Chemical Processes – A Life Cycle Approach; 2nd ed., December 2008.

Department of Energy. The Public Inquiry into the Piper Alpha Disaster; Presented to Parliament by the Secretary of State for Energy by Command of her Majesty; November 1990.

Dole, Elizabeth. Phillips 66 Company Houston Chemical Complex Explosion and Fire: Implications for Safety and Health in the Petrochemical Industry, A Report to the President; April 1990. http://ncsp.tamu.edu/reports/phillips/first%20part.pdf (accessed August 6, 2013).

EPA OIG. Evaluation Report: EPA Can Improve Implementation of the Risk Management Program for Airborne Chemical Releases; February 10, 2009.

EPA OIG. Improvements Needed in EPA Training and Oversight for Risk Management Program Inspections; March 21, 2013. http://www.epa.gov/oig/reports/2013/20130321-13-P-0178.pdf (accessed June 11, 2013).

GAO. Workplace Safety and Health: Multiple Challenges Lengthen OSHA’s Standard Setting; April 19,

  1. http://gao.gov/assets/600/590210.pdf (accessed June 12, 2013).

Hopkins, Andrew. Disastrous Decisions: The Human and Organisational Causes of the Gulf of Mexico Blowout; CCH Australia Limited, 2012.

Hopkins, Andrew. Lessons from Esso’s Gas Plant Explosion at Longford; Australian National University [Online].

Chevron Richmond Refinery Regulatory Report May 2014

96

http://www.sirfrt.com.au/Meetings/IMRt/Southeast/IMRt%20East%2000Nov30/Andrew%20Hopkins%2 0presentation/Lonford%20talk.PDF (accessed May 8, 2013).

Hopkins, Andrew. Managing Major Hazards: The Lessons of the Moura Mine Disaster; National Library of Australia, 1999;.

Hopkins, Andrew. The Meaning of “Safety Cas”e; February 2013.

HSE. A Guide to the Offshore Installations (Safety Case) Regulations 2005: Guidance on Regulations;

  1. http://www.hse.gov.uk/pubns/priced/l30.pdf (accessed May 7, 2013).

HSE. Assessment Principles for Offshore Safety Cases (APOSC); March 2006. http://www.hse.gov.uk/offshore/aposc190306.pdf (accessed August 6, 2013).

HSE. Assessing compliance with the law in individual cases and the use of good practice; May 2003. http://www.hse.gov.uk/risk/theory/alarp2.htm (accessed June 12, 2013).

HSE. Developing process safety indicators: A step-by-step guide for chemical and major hazard industries; 2006. http://www.hse.gov.uk/pubns/books/hsg254.htm (accessed May 28, 2013).

HSE. Planning to do business in the UK offshore oil and gas industry? What you should know about health and safety; October 2011. http://www.hse.gov.uk/offshore/guidance/entrants.pdf (accessed June 5, 2013).

HSE. Play your part! How offshore workers can help improve health and safety; 2013. http://www.hse.gov.uk/pubns/indg421.pdf (accessed June 17, 2013).

Oil & Gas UK. Piper Alpha: Lessons Learnt; 2008. Process Safety Leadership Group. Safety and environmental standards for fuel storage sites; London,

  1. http://www.hse.gov.uk/comah/buncefield/fuel-storage-sites.pdf (accessed August 1, 2013).

Process Safety Leadership Group. Safety and environmental standards for fuel storage sites; London,

  1. http://www.hse.gov.uk/comah/buncefield/fuel-storage-sites.pdf (accessed August 1, 2013).

TAF Powell, SPE, UK Health & Safety Executive. US Voluntary Semp Initiative: Holy Grail or Poisoned Chalice? Proceedings of the Offshore Technology Conference, Houston, Texas, May 8-9, 1996.

The Competent Authority. Buncefield: Why did it happen? The underlying causes of the explosion and fire at the Buncefield oil storage depot, Hemel Hempstead, Hertfordshire on 11 December 2005; February 2011. http://www.hse.gov.uk/comah/buncefield/buncefield-report.pdf (accessed May 21, 2013).

Chevron Richmond Refinery Regulatory Report May 2014

97

Wilson, Michael P. Refinery Safety in California: Labor, Community and Fire Agency Views; Summary Report for Office of Governor Jerry Brown, Interagency Task Force on Refinery Safety; March 27, 2013, Revised June 4, 2013. Citing Zimgast, Erst. (June 6, 2006). Selective U/W in Oil-Petro Segment: Loss Burden in Different Regions, USA vs. Rest of the World, History of Selective U/W, Cause of Losses. Technical report-DRAFT-EXTRACT. Risk Engineering Services, Swiss Re. http://www.lohp.org/projects/refinery_safety.html (accessed July 8, 2013).

Chevron Richmond Refinery Regulatory Report May 2014

98

Appendix A: Significant Petroleum Refinery Incidents in 2012 1. Tank failure at the ExxonMobil refinery in Beaumont, Texas on 11 January 2. Vessel pressure excursion at the Flint Hills refinery in St. Paul, Minnesota on 22 January 3. Hydrogen Sulfide release from mechanical integrity failure at the Northern Tier Energy refinery in St. Paul, Minnesota on 26 January 4. Sulfuric acid release from a mechanical integrity failure at the ConocoPhillips refinery in Wood River, Illinois on 27 January 5. Hydrogen Sulfide release from mechanical integrity failure at the Marathon refinery in Garyville, Louisiana on 31 January 6. Hydrocarbon and hydrogen fluoride release from a mechanical integrity failure at the Flint Hills refinery in Corpus Christi, Texas on 31 January 7. Sulfur dioxide and hydrogen sulfide release following a vessel pressure excursion at the Alon refinery in Big Spring, Texas on 1 February 8. Hydrocarbon release from a vessel pressure excursion at the ConocoPhillips refinery in Belle Chasse, Louisiana on 1 February 9. Benzene release from a mechanical integrity failure at the Husky refinery in Lima, Ohio on 16 February 10. Fire at the Tesoro refinery in Salt Lake City, Utah on 17 February 11. Fire at the BP refinery in Cherry Point, Washington on 17 February 12. Tank failure at the Shell refinery in Deer Park, Texas on 22 February 13. Tank failure at the Paulsboro refinery in Paulsboro, New Jersey on 23 February 14. Fire at the Citgo refinery in Corpus Christi, Texas on 24 February 15. Hydrogen Sulfide release from a mechanical integrity failure at the Flint Hills refinery in Rosemount, Minnesota on 28 February 16. Vessel pressure excursion at the Motiva refinery in St. Charles, Louisiana on 28 February 17. Benzene release from a mechanical integrity failure at the Chalmette refinery in Chalmette, Louisiana on 28 February 18. Crude oil release from a mechanical integrity failure at the Flint Hills refinery in North Pole, Alaska on 4 March 19. Hydrogen fluoride release from a mechanical integrity failure at the Citgo refinery in Corpus Christi, Texas on 6 March 20. 1 worker was fatally injured and 2 other workers were burned at the Valero refinery in Memphis, Tennessee on 6 March 21. Fire during a hot work activity at the Tesoro refinery in Martinez, California on 7 March 22. Benzene release from a mechanical integrity failure at the Chevron refinery in Pascagoula, Mississippi on 8 March 23. Heavy oil release from a mechanical integrity failure at the Chevron refinery in Pascagoula, Mississippi on 13 March 24. Benzene release from a mechanical integrity failure at the Marathon refinery in Texas City, Texas on 14 March 25. Fire at the PBF Energy refinery in Delaware City, Delaware on 16 March 26. Hydrocarbon release from a mechanical integrity failure at the Chevron refinery in Pascagoula, Mississippi on 19 March

Chevron Richmond Refinery Regulatory Report May 2014

99

Hydrocarbon release from a mechanical integrity failure at the Tesoro refinery in Anacortes, Washington on 23 March

Hydrocarbon release from a mechanical integrity failure at the ExxonMobil refinery in Baytown, Texas on 24 March

Fire at the ExxonMobil refinery in Billings, Montana on 25 March

Hydrogen fluoride release from a mechanical integrity failure at the BP refinery in Texas City, Texas on 27 March

Hydrocarbon release from a mechanical integrity failure at the Total refinery in Port Arthur, Texas on 11 April

Fire at the ConocoPhillips refinery in Rodeo, California on 13 April

Hydrocarbon release from a mechanical integrity failure at the Flint Hills refinery in Corpus Christi, Texas on 16 April

Crane fell over and damaged utility piping at the Citgo refinery in Lemont, Illinois on 17 April

Hydrocarbon release from a mechanical integrity failure at the Flint Hills refinery in Corpus Christi, Texas on 19 April

Fire at BP refinery in Texas City, Texas on 20 April

Hydrocarbon release from a mechanical integrity failure at the ConocoPhillips refinery in Sweeny, Texas on 24 April

Fire at the Sunoco refinery in Philadelphia, Pennsylvania on 8 May

4 workers injured in fire at the Sinclair refinery in Sinclair, Wyoming on 8 May

Hydrocarbon release from a mechanical integrity failure at the LyondellBasell refinery in Houston, Texas on 8 May

Fire at the Sunoco refinery in Philadelphia, Pennsylvania on 9 May

Fire at the Motiva refinery in Port Arthur, Texas on 12 May

Hydrogen sulfide release from a mechanical integrity failure at the CVR Energy refinery in Wynnewood, Oklahoma on 11 May

Hydrogen fluoride release from a mechanical integrity failure at the Citgo refinery in Corpus Christi, Texas on 15 May

Hydrogen sulfide release from a mechanical integrity failure at the Shell refinery in Deer Park, Texas on 17 May

Benzene and hydrogen sulfide release from a mechanical integrity failure at the Flint Hills refinery in Corpus Christi, Texas on 21 May

Fire at the Montana Refining Company refinery in Great Falls, Montana on 24 May

Hydrocarbon release from a mechanical integrity failure at the Valero refinery in Memphis, Tennessee on 25 May

2 workers injured from a fire at the Sinclair refinery in Sinclair, Wyoming on 28 May

Propylene release from overpressure event at the PBF Energy refinery in Delaware City, Delaware on 29 May

Hydrocarbon release from a mechanical integrity failure at the Valery refinery in Houston, Texas on 31 May

Hydrogen and hydrocarbon release due to loss of containment event at the Shell refinery in Deer Park, Texas on 7 June Chevron Richmond Refinery Regulatory Report May 2014

100

Hydrogen sulfide and hydrocarbon release due to flare failure at the Motiva refinery in Norco, Louisiana on 7 June

Fire at the Motiva refinery in Port Arthur, Texas on 9 June

Hydrocarbon release due to a mechanical integrity failure at the BP refinery in Texas City, Texas on 9 June

Fire at the ExxonMobil refinery in Torrance, California on 11 June

Fire at the Total refinery in Port Arthur, Texas on 13 June

Hydrogen sulfide release from a tank failure at the ConocoPhillips refinery in Rodeo, California on 15 June

Hydrocarbon release at the Shell refinery in Deer Park, Texas on 20 June

Fire at the BP refinery in Whiting, Indiana on 21 June

Hydrocarbon release due to a mechanical integrity failure at the Valero refinery in Corpus Christi, Texas on 23 June

Benzene release due to a mechanical integrity failure at the ExxonMobil refinery in Baton Rouge, Louisiana on 25 June

Benzene release due to a mechanical integrity failure at the ExxonMobil refinery in Baytown, Texas on 28 June

Propane release due to a mechanical integrity failure at the Valero refinery in McKee, Texas on 28 June

Sulfuric acid release due to a mechanical integrity failure at the Chevron refinery in El Segundo, California on 2 July

Hydrocarbon release due to a mechanical integrity failure at the Phillips 66 refinery in Westlake, Louisiana on 14 July

Fire at the Citgo refinery in Corpus Christi, Texas on 16 July

Fire at the Valero refinery in Meraux, Louisiana on 22 July

Sulfuric acid release due to a mechanical integrity failure at the Sunoco Point Breeze refinery in Philadelphia, Pennsylvania on 22 July

Fire at the BP refinery in Whiting, Indiana on 23 July

Hydrocarbon and hydrogen fluoride release due to a mechanical integrity failure at the Flint Hills refinery in Corpus Christi, Texas on 24 July

Fire at the HollyFrontier refinery in Tulsa, Oklahoma on 2 August

8,614 lbs of hydrogen sulfide were released to the atmosphere due to a mechanical integrity failure on a compressor suction line at the Chevron refinery in Richmond, California on 2 August.

Hydrogen sulfide release from an overpressure event at the Valero refinery in Texas City, Texas on 5 August

Fire at the Sinclair refinery in Sinclair, Wyoming on 5 August

Fire at the Chevron refinery in Richmond, California on 6 August

Fire at the Shell refinery in Martinez, California on 13 August

Hydrogen sulfide release from a mechanical integrity failure at the Shell refinery in Martinez, California on 14 August

2 workers injured from a fire at the BP refinery in Whiting, Indiana on 14 August

Hydrogen sulfide release due to a mechanical integrity failure at the Phillips 66 refinery in Wood River, Illinois on 22 August Chevron Richmond Refinery Regulatory Report May 2014

101

Fire at the Sinclair refinery in Sinclair, Wyoming on 24 August

Hydrocarbon release due to a mechanical integrity failure at the LyondellBasell refinery in Houston, Texas on 25 August

Hydrocarbon release due to a mechanical integrity failure at the Flint Hills refinery in Corpus Christi, Texas on 26 August

Hydrogen sulfide and propylene release due to a mechanical integrity failure at the ExxonMobil refinery in Beaumont, Texas on 29 August

Fire at the Phillips 66 refinery in Rodeo, California on 29 August

A high pressure excursion in a vessel resulted in a hydrocarbon release with offsite consequences at the Holly refinery in Woods Cross, Utah on 30 August

Worker injured following a fire at the Marathon refinery in Detroit, Michigan on 5 September

Chemical release with offsite consequences at the Marathon refinery in Detroit, Michigan on 8 September

Sulfuric acid release due to a mechanical integrity failure at the Tesoro refinery in Martinez, California on 10 September

Carbon monoxide and hydrogen sulfide release due to a mechanical integrity failure at the ExxonMobil refinery in Baytown, Texas on 11 September

Hydrogen sulfide release due to a mechanical integrity failure at the Marathon refinery in Garyville, Louisiana on 11 September

Hydrocarbon release due to a mechanical integrity failure at the Chevron refinery in Pascagoula, Mississippi on 14 September

Unspecified leak at the Tesoro refinery in Martinez, California on 15 September

Hydrocarbon release due to a mechanical integrity failure at the PBF Energy refinery in Delaware City, Delaware on 21 September

Hydrogen sulfide release due to a mechanical integrity failure at the Motiva refinery in Norco, Louisiana on 24 September

1 worker killed and another worker injured from an explosion at the CVR Energy refinery in Wynnewood, Oklahoma on 28 September

Fire at the Motiva refinery in Convent, Louisiana on 1 October

Hydrogen fluoride release at the Placid refinery in Port Allen, Louisiana on 1 October

Hydrogen sulfide release from a high pressure excursion at the Valero refinery in Port Arthur, Texas on 1 October

Fire at the ExxonMobil refinery in Baytown, Texas on 3 October

Vapor cloud release at the Hess refinery in Port Reading, New Jersey on 3 October

Hydrocarbon release due to a mechanical integrity failure at the Phillips 66 refinery in Rodeo, California on 8 October

Fire at the Citgo refinery in Corpus Christi, Texas on 9 October

Vapor cloud release with offsite impact from the Kern Oil refinery in Bakersfield, California on 17 October

Hydrocarbon and hydrogen sulfide release from a pressure excursion at the ExxonMobil refinery in Joliet, Illinois on 19 October

Hydrocarbon release due to a mechanical integrity failure at the Citgo refinery in Sulfur, Louisiana on 22 October Chevron Richmond Refinery Regulatory Report May 2014

102

Hydrogen sulfide release at the Chalmette refinery in Chalmette, Louisiana on 23 October

Fire at the Tesoro refinery in Martinez, California on 21 October

Fire at the BP refinery in Texas City, Texas on 30 October

Fire at the Valero refinery in Port Arthur, Texas on 3 November

Benzene release due to a mechanical integrity failure at the Shell refinery in Deer Park, Texas on 8 November

Vapor release at the Tesoro refinery in Martinez, California on 8 November

Hydrogen sulfide release due to a mechanical integrity failure or a high pressure excursion at the Shell refinery in Martinez, California on 24 November

Hydrogen sulfide and hydrocarbon release at the Northern Tier Energy refinery in St. Paul Park, Minnesota on 27 November

Benzene release due to a mechanical integrity failure at the ExxonMobil refinery in Baton Rouge, Louisiana on 1 December

Hydrogen fluoride release that killed one worker, injured 2 other workers and 7 emergency responders at the Valero refinery in Memphis, Tennessee on 3 December

Hydrocarbon release due to a mechanical integrity failure at the Flint Hills refinery in Corpus Christi, Texas on 5 December

Hydrogen sulfide release at the Phillips 66 refinery in Wood River, Illinois on 8 December

Fire at the Motiva refinery in Port Arthur, Texas on 11 December

Benzene release due to a mechanical integrity failure at the Alon refinery in Big Spring, Texas on 11 December

Hydrocarbon release due to a mechanical integrity failure at the Shell refinery in Deer Park, Texas on 11 December

Hydrocarbon release at the Shell refinery in Anacortes, Washington on 12 December

Hydrogen sulfide release due to a pressure excursion at the PBF Energy refinery in Paulsboro, New Jersey on 14 December

Hydrocarbon and hydrogen sulfide release due to a mechanical integrity failure at the Marathon refinery in Garyville, Louisiana on 15 December

Fire at the Motiva refinery in Port Arthur, Texas on 17 December Note -Incidents of hydrocarbon leaks into a cooling tower or releases to a flare system are not included in the above list. Chevron Richmond Refinery Regulatory Report May 2014

103

Appendix B: Regulatory Comparison Table OSHA PSM Standard California PSM Standard The Safety Case Regulatory Regime Scope Covered processes excluding oil and gas well drilling and servicing Covered processes excluding oil and gas well drilling and servicing Applies to offshore and onshore oil and gas operations Specific PSM/ Major Accident Focus Yes Yes Yes ALARP or Equivalent No No Yes Adaptability to New or Revised Codes, Standards, Technology, Hazard Information, Lessons Learned, etc. Limited to RAGAGEP –only addresses equipment and mechanical integrity (2 of 14 elements); RAGAGEP not defined in the standard or a referenced list, only a handful of standards referenced as RAGAGEP in OSHA interpretation letters Limited to RAGAGEP – only addresses equipment and mechanical integrity; RAGAGEP not defined in the standard or a referenced list, only a handful of standards referenced as RAGAGEP in OSHA interpretation letters Yes via safety case and supporting framework legislation PSM Indicators Req. No No Yes for Companies Competent Regulator 50% or more Engineers/PSM OSHA-some progress but no Cal/OSHA – some progress but no Yes Sufficient Funding for Competent Regulatory staff OSHA-No California is increasing funding to support additional staff on Cal/OSHA PSM team Yes Hazard Analysis Required – “shall identify, evaluate, and control the hazards involved in the process.” Required – “appropriate to the complexity of the process for identifying, evaluating, and controlling hazards involved in the process.” Is a specific aspect of SC and supporting framework regulation and is required for all onshore and offshore facilities. To meet legislative goal-setting requirements, a structured risk assessment including HA as appropriate is required from all “employers.”

Chevron Richmond Refinery Regulatory Report May 2014

104

Incident Investigation Requires a report but activity- based; requires including “any recommendations resulting from the investigations” (what if there are none?); system required to “resolve the incident report findings and recommendation; no explicit requirement to prevent a similar occurrence or controlling hazards. Requires a report including “any recommendations resulting from the investigation.” System required to “establish a system to promptly address and resolve the report findings and recommendations and…implement the report recommendations in a timely manner, or take action to prevent a reoccurrence.” Investigation of incidents required to demonstrate legal compliance with framework legislation. ‘Reasonably practicable’ requirement would require remedial action and cross company learning from incident investigations. HSE can require SC duty holder compliance with investigation report recommendations (e.g. Buncefield Report-“determine SIL level requirements for overfill protection”) Management of Change Activity-based; the employer “shall establish and implement written procedures to manage changes;” “the procedures shall assure the following considerations are addressed…impact of change on safety and health;” no formal hazard analysis required; no requirement that the identified safety impacts or hazards be controlled. Activity-based: the employer “shall establish and implement written procedures to manage changes…;” “the procedures shall assure that the following are addressed prior to any change…technical basis for proposed change; impact of change on safety and health;” no formal hazard analysis required; no requirement that the identified safety impacts or hazards be controlled. Description of MOC procedures and demonstrations of their effectiveness in managing major accident hazard risk are a key requirement of the safety case. Workforce Participation “Employers shall develop a written plan of action regarding the implementation of the employee participation;” Employers shall consult with employees and their representatives on the conduct and development of PHAs and the other elements of PSM in this standard.” “Employer shall develop a written plan of action to ensure employee participation in process safety management;” includes employer consultation with employees and their representatives on the conduct and development of the elements of process safety management required by this section; and providing employees and their representatives with access to all information required to be developed by this section…” Provides for the election of protected safety representative positions and safety committees.

Chevron Richmond Refinery Regulatory Report May 2014

105

Inherent Safety No No Yes

Chevron Richmond Refinery Regulatory Report May 2014

106

Appendix C: Frequently Asked Questions (FAQs) Regarding the Safety Case Regulatory Approach

  1. Is it true that the safety case regulatory approach leads to self-regulation by industry?

Critics of the safety case regulatory approach have noted that this type of regulatory regime is likely to result in mere industry self-regulation.446 Critics have also noted that this is at least partly due to the fact that there is no will in the US to ensure that regulators have the tools, resources, and competence to effectively regulate workplaces. The CSB and those with experience in developing and implementing the safety case regulatory regime have repeatedly stated that the purpose of the safety case regulatory approach is to ensure that all hazards have been identified, evaluated, and controlled so that risks are reduced to as low as reasonably practicable, or ALARP. In simple terms, the safety case report is a series of claims as to how an installation is being safety operated. The real strength of the safety case regulatory regime is testing the validity of those claims through strategic intervention by competent, well-funded regulators. Advanced performance-based regulatory regimes in the United Kingdom (UK) and Norway, for example,447 incorporate a list of regulator-accepted standards and good practices that provide companies with the minimum performance that is expected. Companies must demonstrate that they meet or exceed those standards. Therefore, companies are aware of minimum performance expectations they must meet as they work to reduce risks to ALARP. If a competent regulator is not in place, then the safety case report equates to nothing more than a lifeless document sitting on a shelf, and the criticism of self-regulation becomes valid.

It is also important to point out that in a letter from the USW Local 5 to the CSB dated November 22, 2013, it was stated that “[t]he current system is truly a self regulated system, with the industry setting the rules, changing the rules, and monitoring themselves.” Individuals are noting that the current system in place has actually led to self-regulation despite the intent of the PSM standard and RMP program to be performance-based.

Critics have also argued that there is a lack of transparency with the safety case regime. However, under the existing PSM standard, none of the PSM elements are made public by the company or the regulator, including the process hazard analyses and management of change documents. To improve transparency, many safety case regimes collect and report indicator data, and companies are required make safety case report summaries publicly available. These are high level documents that are published online and summarize safety assessments, hazardous materials, hazards and control measures, potential major incidents, emergency response, and safety management systems.

Rather than accepting the inevitability of catastrophic events, we should act to prevent them from happening. As discussed in this report, there is a movement in California to improve oversight of

446 See e.g. Rena Steinzor. Lessons from the North Sea: Should “Safety Cases” Come to America? Vol. 38: 417; 2011; p 439. Available at http://papers.ssrn.com/sol3/papers.cfm?abstract_id=1735537 (accessed September 4, 2013). 447 Norway requires many similar aspects of a safety case regime offshore but there are differences in implementation and style and content of the regulations. The UK implements a safety case regime both onshore and offshore.

Chevron Richmond Refinery Regulatory Report May 2014

107

petroleum refineries. There has also been increased dialogue in the US in recent years surrounding the regulation of the oil and gas industry and how to make improvements. As such, the support exists to not only shift the current activity-based regulatory structure to a more goal-based safety case regulatory regime, but to also ensure that competent, well-funded regulators are in place to implement and enforce such a regime.

rulemaking under the Administrative Procedure Act? The Administrative Procedure Act, or APA, was passed in 1947, and lays out the basic framework under which federal rulemaking is conducted. It defines “rule” as “the whole or a part of an agency statement of general or particular applicability and future effect designed to implement, interpret, or prescribe law or policy or describing the organization, procedure, or practice requirements of an agency…”448 “Rulemaking” is defined as the “agency process for formulating, amending, or repealing a rule.”449 Federal agencies often impact their specific area of jurisdiction by publishing rules promulgated through notice and comment rulemaking, or informal rulemaking, under the APA. Unfortunately, as this report discusses at length, the rulemaking process in the US is cumbersome and some federal agencies, such as OSHA and the EPA, are subject to additional requirements and more stringent review standards that go above and beyond those contained in the APA. To avoid these additional burdens, many agencies provide further guidance to regulated parties through more informal means, such as answering questions and issuing policy statements, guidance, or opinion letters. Another way to lessen the burden on regulating agencies and their regulated entities is to adopt performance or goal-based regulations rather than prescriptive regulations. Performance-based standards state the objective or outcome to be achieved, such as risk reduction, without describing the specific means of obtaining that objective. This provides the regulated entities with the freedom and flexibility to work to achieve a stated goal, such as reducing risks to as low as reasonably practicable, or ALARP, through their chosen and preferred means.450 Performance-based standards also provide flexibility to the regulator; for example, in a safety case regulatory regime, should the regulator determine through assessment of the safety case report and/or inspection that the facility has not reduced risks to ALARP with regard to a specific hazard, he or she may require that the facility take additional steps to further reduce risk without needing to propose and adopt a new rule or regulation to address it. The regulator must accept the safety case report in order for the facility to operate.

The Regulatory Flexibility Act was passed in 1980 during the Carter Administration. It requires agencies to prepare and make available for public comment regulatory flexibility analyses of proposed rulemaking, and also encourages agencies to consider alternatives to rulemaking, including “the use of performance rather than design standards…”451 Executive Order 13272 then directed federal agencies to establish procedures and policies to comply with the Act.452 Federal agencies have been encouraged to adopt

448 5 U.S.C. §551(4) (2011). 449 5 U.S.C. §551(5) (2011). 450 Such as reliance upon qualitative assessments, quantitative assessments, semi-quantitative risk assessments, and good practice guidance. 451 5 U.S.C. §603(3) (2010). 452 Exec. Order No. 13272, 67 Fed. Reg. 159 (August 13, 2002). http://www.gpo.gov/fdsys/pkg/FR-2002-08- 16/pdf/02-21056.pdf (accessed September 24, 2013).

Chevron Richmond Refinery Regulatory Report May 2014

108

performance-based standards in the US for decades. Recognizing the inefficient process of federal rulemaking in the US, President Clinton signed Executive Order 12866 in September of 1993, which, among other things, directed federal agencies to “identify and assess alternative forms of regulation…[and] specify performance objectives, rather than specifying the behavior or manner of compliance that regulated entities must adopt.”453 Executive Order 13563, entitled Improving Regulation and Regulatory Review, supplemented and reaffirmed Executive Order 12866 by ordering agencies to “identify and consider regulatory approaches that reduce burdens and maintain flexibility and freedom of choice for the public.”454 Its stated goal was to “protect public health, welfare, safety, and our environment while promoting economic growth, innovation, competitiveness, and job creation.”455 Its seven guiding principles are as follows:  Increase predictability and reduce uncertainty;  Use and rely on best available science;  Ensure public participation and open exchange of ideas;  Use the most innovative and least burdensome tools;  Consider cost benefit analysis (quantitative and qualitative);  Ensure regulations are publicly available, consistent, written in plain language and easy to understand; and  Measure results and seek to improve actual results.456

The safety case regime aims to satisfy all of these principles.

California has adopted its own version of the APA, known as the California Administrative Procedure Act (CAPA) (California Government Code §11340 et seq.).457 Among its many requirements for California state agencies that adopt regulations, CAPA directs them to consider the substitution of performance standards for prescriptive standards.458 CAPA defines “performance standard” as “a regulation that describes an objective with the criteria stated for achieving the objective.”459

Federal agencies that are engaged in and responsible for regulating high hazards, such as NASA and the Nuclear Regulatory Commission (NRC), have adopted goal or performance-based standards that require risks to be reduced to “as safe as reasonably practicable” (ASARP) and “as low as reasonably achievable,” (ALARA), respectively. The OSHA Process Safety Management (PSM) standard also contains performance-based elements to some extent; for example, it provides regulated entities with flexibility in how to perform a process hazard analysis (PHA). However, it contains no risk reduction goals such as ALARP. This has resulted in an activity-based regulatory scheme that emphasizes completing activities, such as a PHA or a Management of Change (MOC) analysis, rather than actual risk reduction. Without a risk reduction goal such as ALARP in place, the PSM standard will not have the

453 Exec. Order No. 12866, 48 Fed. Reg. 190 (September 30, 1993). http://www.archives.gov/federal- register/executive-orders/pdf/12866.pdf (accessed September 24, 2013). 454 Exec. Order No. 13563, 76 Fed. Reg. 14 (January 21, 2011). http://www.gpo.gov/fdsys/pkg/FR-2011-01- 21/pdf/2011-1385.pdf (accessed September 24, 2013). 455 Ibid. 456 Ibid. 457 Available at http://www.oal.ca.gov/administrative_procedure_act.htm (accessed September 18, 2013). 458 California Government Code, §11340.1(a) (1995). 459 California Government Code, §11342.570 (1995).

Chevron Richmond Refinery Regulatory Report May 2014

109

ability to successfully drive continuous improvement and adaptation of industry safety management advances.

less than other regions and unionization rates are lower than other countries? A majority of the workforce in California petroleum refineries is unionized, as the unionization rate for the 14 petroleum refineries in California is actually 73 percent,460 which is significantly higher than the 2012 rates for the US as a whole (11.1 percent), Australia (17.9 percent), the UK (25.8 percent), and Norway (54.7 percent).461 Despite a declining unionization rate in the UK, the region has developed strong onshore and offshore regulations that provide for the creation of protected safety representative positions and safety committees for unionized and non-unionized facilities. These positions are meant to create a healthier and safer workplace, and result in better decision-making regarding health and safety, increased productivity, higher workforce motivation, a stronger commitment to implementing decisions or actions (as employees have been actively involved in reaching these decisions), and greater cooperation and trust.462 The HSE has devoted extensive time and resources to ensuring employers are complying with these regulations and understand the importance and benefits of involving workers in health and safety-related matters.

The UK also has a standard establishing the minimum level of training that elected safety representatives offshore should receive to enable them to fully perform their functions as defined in the Safety Representatives and Safety Committees Regulations – SI 1989/971. This training standard, entitled the OPITO Approved Standard, was developed by an industry workgroup facilitated by OPITO.463 In June 2013, Det Norske Veritas (DNV)464 became accredited by OPITO to offer newly developed training courses to more than 2,000 elected safety representatives in the offshore industry. The training, which has been driven and supported by HSE, Oil and Gas UK, and the Offshore Industry Advisory Committee’s Workforce Involvement Group, consists of four separate Modules run over the course of eight days.465 The training covers topics such as Understanding and Identifying Major Accident Hazards and Investigating Incidents and Applying Root Cause Analysis.

The CSB recognizes the HSE’s effort to improve workforce involvement through regulations, protected positions, and training, and has recommended in this report that California develop regulations and guidelines to establish similar protected safety positions to ensure effective workforce participation. The

460 In September 2013, the USW provided the CSB with a list of California petroleum refinery locations as of October 2012 and the existing unionization representation at those refineries. Of the 15 petroleum refineries operating in California as of October 2012, 11 of those were unionized, with USW providing the union representation at all 11 facilities. 461 For complete statistics on trade union density for countries around the world see http://stats.oecd.org/Index.aspx?QueryId=20167 (accessed September 5, 2013). 462 HSE. Consulting employees on health and safety: A brief guide to the law. 2013; p 2. http://www.hse.gov.uk/pubns/indg232.pdf (accessed September 5, 2013). 463 OPITO is an industry-owned non-profit that serves the needs of the oil and gas industry in the UK and around the world. See http://www.opito.com/ (accessed September 10, 2013). 464 DNV is an independent foundation headquartered in Oslo, Norway, that provides services for managing risk around the world. For more information see http://www.dnv.com/ (accessed September 10, 2013). 465 http://www.marinelink.com/news/launches-offshore355749.aspx (accessed September 10, 2013).

Chevron Richmond Refinery Regulatory Report May 2014

110

CSB believes the HSE model can also be effective in the US as these regulations require effective safety representation regardless of unionization rates.

The CSB has identified a small number of independent studies conducted on the impact of the safety case regulatory approach on safety performance onshore and offshore. In 1999, a report commissioned by the HSE (“the Aberdeen Report”) which evaluated the impact of the offshore Safety Case Regulations on offshore safety was published.466 One of the purposes of the study was to review published safety data for trends in offshore accidents and incidents from 1990 until 1997.467 Upon this review, it was determined there had been a decrease in accidents since the implementation of the offshore safety case regulations in the UK, but cautioned it was difficult to distinguish the effect of the safety case regulations from other industry activities such as the level and type of exploration and production activity, oil prices, and industry-led initiatives.468 The Aberdeen Report also cautioned about the difficulties in analyzing offshore data that also hold true for the more current data presented in Figure 3. The total number of accidents and incidents recorded can be affected by industry attitudes toward reporting, changes in how and what data is reported, and the decrease or increase in offshore activity. As stated in the Aberdeen Report, “[d]espite these cautions, accident statistics play an important role in the analysis of the state of safety in any industry, since accidents represent the ‘bottom line’ in safety. It is therefore important to analyze the trends, but to also take the drawbacks into consideration.”469 As discussed in this report, the reporting and analyzing leading process safety indicators is important to gain a better understanding of how safety management systems are functioning, and thus a better idea of how well the various regimes are managing hazards and mitigating risk. Statistics from the seven years covered by the Aberdeen Report indicated an overall decrease in reported accident rates in the UK and Norwegian databases up until 1994. From 1994 to 1997, both the UK and Norway reported a slight increase in the number of reported accidents.470 Norway did report a drop in 1997 from 1996. The decrease reported up until 1994 for the UK appeared to be independent of the offshore production activities as those levels had been on the increase during the same time period. Drilling in the UK decreased during the same time frame, making the cause for the decrease in reported drilling accidents unclear. More recent reviews of accident data indicate decreasing trends in accident statistics. The Presidential Oil Spill Commission noted the following in its report to the President on the Macondo disaster: [f]rom 2004 to 2009, fatalities in the offshore oil and gas industry were more than four times higher per person-hours worked in U.S. waters than in European waters, even though many of the same companies work in both venues. This striking statistical discrepancy reinforces the view that the problem is not an inherent trait of the business itself, but rather

466 Evaluation of the Offshore Safety Legislative Regime—A study undertaken by AUPEC Ltd. For the Safety Policy Division, Health & Safety Executive, Ref: 8938/3714, June 1999. 467 Ibid at Ch 7. 468 Ibid at Ch 7, p 7-1. 469 Ibid at Ch. 7, p 7-11. 470 This was based on the number of accidents per million man hours for the two Continental Shelves (Ibid, Figure 7.8)

Chevron Richmond Refinery Regulatory Report May 2014

111

depends on the differing cultures and regulatory systems under which members of the industry operate.471

In September 2013, Det Norske Veritas (DNV)472 released a position paper discussing necessary improvements to reduce risk of major offshore accidents, and noted in the report that “there are no good globally accepted metrics for major accident hazards…”473 However, DNV was able to point to UK HSE’s Hydrocarbon Releases Database System (HCR)474 in the North Sea to provide an example of improving safety performance trends.475 The HRC contains detailed voluntary information of over 4,000 hydrocarbon releases offshore from close to 300 installations since 1992. The HRC data, plotted in Figure 3, show the total number of releases to be on the decline. Classifying the severity of a release is based on agreed-upon criteria with the offshore industry.476 The UK has defined significant events to be those that, if ignited, have the potential to cause a major accident where multiple casualties could occur. The occurrence of any hydrocarbon release is undesirable because of the potential to escalate, and so reporting data from minor incidents has also been included in Figure 3 below.

Figure 3. Hydrocarbon releases in the North Sea reported to UK HSE as dangerous occurrences under the Reporting of Injuries, Diseases and Dangerous Occurrences Regulations.477

471 National Commission on the BP Deepwater Horizon Oil Spill. Deep Water: The Gulf Oil Disaster and the Future of Offshore Drilling. Report to the President; January 2011; Ch 8 p 225. 472 DNV is an independent foundation headquartered in Oslo, Norway, that provides services for managing risk around the world. For more information see http://www.dnv.com/ (accessed September 10, 2013). 473 DNV. Enhancing offshore safety and environmental performance: Key levers to further reduce the risk of major offshore accidents. 2013; p 5. http://www.dnv.com/industry/oil_gas/services_solutions/offshore_safety.asp (accessed September 10, 2013). 474 https://www.hse.gov.uk/hcr3/ (accessed January 13, 2014). 475 In its position paper, DNV cited data from 1996, but UK HSE has noted that the criteria for severity classification was refined in 1999 so data since that date is presented here. 476 Hydrocarbon Releases System Internet Help File, https://www.hse.gov.uk/hcr3/help/help_public.asp (accessed September 10, 2013). 477 RIDDOR – Reporting of Injuries, Diseases and Dangerous Occurrences Regulations 1995 became effective offshore on April 1, 1996, http://www.hse.gov.uk/riddor/ (accessed September 10, 2013) 0 50 100 150 200 250 Reported Releases Financial Year (April‐March)  2000/01 to 2012/13 Minor Significant Major Total

Chevron Richmond Refinery Regulatory Report May 2014

112

It is important to note that major accidents are low-probability, high-consequence events, and as such they are difficult to measure. According to Dr. Andrew Hopkins, major accidents are more difficult to define than, say, a car accident, and they are rare, making it difficult to estimate the number of major accidents prevented.478 In addition, based on the data in existence, there is a continued need for improved data collection; key leading performance indicators development and implementation on a global scale would provide an improved glimpse into how safety is being managed for major accident prevention.

A team of three independent safety experts was asked to conduct an independent evaluation of the operational effectiveness of the National Offshore Petroleum Safety Authority (NOPSA), which was established in January 2005 to regulate offshore health and safety in Australia (it was superseded by NOPSEMA in January 2012). The 2008 report released as a result of the evaluation noted that the team of experts received submissions identifying issues surrounding the safety case regime from twelve stakeholders, including the Australian Workers Union, the Maritime Union of Australia, and the International Association of Drilling Contractors. The report states that a majority of the submissions expressed that the safety case regime had “generally been a success…” and “had led to improvements and already brought forth better consistency in many areas….”479 The report noted that there was general stakeholder agreement “that the regulatory processes have been improved.”480

As mentioned in Section 3.2.1.2 of the report, following the Macondo incident in April 2010, an independent review of the offshore safety case regime in the UK was conducted by a panel consisting of three independent appointees, including Professor Geoffrey Maitland at Imperial College London. A report was published discussing the review in December 2011, and it noted that, while not perfect, the offshore safety case regime was “robust and effective at identifying risks and appropriate measures for mitigation and response….”481 The report stated the following:

From its analysis of the existing UK framework and the information it gleaned from its discussion with those directly involved in the sector from both an operational and regulatory perspective, the Review Panel was reassured that the UK regime already incorporates a number of positive, key features which were not present in the US at the time of the Macondo incident. At a high level, the Panel notes and commends in particular:

• the UK’s “goal-setting” safety regime and its ability to foster innovation and continuous improvement in process integrity,

478 Hopkins, Andrew. The Cost-Benefit Hurdle for Safety Case Regulation: A discussion paper prepared for the US Chemical Safety Board. Add Date, Page, and Link. 479 Ognedal, Magne; Griffiths, Derek; and Lake, Bruce. Review of the National Offshore Petroleum Safety Authority Operational Activities. February-March 2008; p 14. 480 Ibid at 28. 481 Maitland, Geoffrey. Offshore Oil and Gas in the UK: an independent review of the regulatory regime. December 2011; p 4. https://www.gov.uk/government/uploads/system/uploads/attachment_data/file/48252/3875- offshore-oil-gas-uk-ind-rev.pdf (accessed January 13, 2014).

Chevron Richmond Refinery Regulatory Report May 2014

113

• the strength of the mechanisms in place for independent, third party verification in the crucial areas of well design and integrity of safety critical equipment,

• the rigour with which the potential environmental impacts of the industry are examined and of the controls and procedures in place to mitigate them,

• the detailed and comprehensive emergency response framework which exists for managing the consequences of incidents should they occur,

• the high regard in which the UK authorities, in the form of DECC, HSE and MCA, are held both by UK operators and international observers,

• the fact that the events in the Gulf of Mexico have clearly acted as a catalyst for UK operators, working in concert with the regulators and other stakeholders, to redouble their efforts to improve safety and to strengthen response capabilities.482

safety critical equipment, poor understanding of the potential impact of degrading plant and utility systems on safety critical elements, and lack of understanding of the role of asset integrity and the concept of barriers in major hazard risk control. Don’t these reports developed by the UK regulator demonstrate that the safety case is not effective and is not working? The CSB recognizes that there have been critiques of the safety case regime and its implementation. The CSB acknowledges that the safety case is not perfect and that no regulatory system will be perfect in its implementation. Some have noted the issue of aging equipment due to many issues, including the harsh conditions that exist in the North Sea. Regulators and commissions in the UK have found degradation of pipes, valves, and other equipment at many facilities due to company deferrals of maintenance, insufficient testing of safety-critical elements, and a continuing industry culture of responding to disasters, rather than anticipating worst-case scenarios. However, the safety case regime’s adaptive nature has been able to address these concerns. The HSE has recognized asset integrity management and the issue of ageing equipment as key issues to address in its inspection programs, and has developed internal processes and priorities for these areas. In 2010, the UK HSE initiated Key Programme 4 to address the issue of aging equipment offshore and the operation of installations beyond their design life.484 The same year, the HSE published a report intended 482 Ibid at 3. 483 The HSE published a report to communicate the results and conclusions of the Asset Integrity Key Programme carried out between 2004 and 2007 by the Health and Safety Executive’s Offshore Division. See http://www.hse.gov.uk/offshore/kp3.pdf (accessed August 28, 2013). 484 The report is available at http://www.hse.gov.uk/offshore/ageing/kp4-interim-report.pdf (accessed November 1, 2013).

Chevron Richmond Refinery Regulatory Report May 2014

114

to inform industry and aid in the prevention of major accidents entitled Managing Ageing Plant: A Summary Guide,485 which provides an overview of ageing plant mechanisms and their management and presents the findings of an analysis of loss of containment incidents to indicate the extent to which ageing plant equipment may be a factor. This type of programmatic proactive approach and information dissemination is lacking in the US both on and offshore.

when transitioning to a safety case approach? From the international safety case community, the CSB has found that when transitioning to a safety case regime there are many obstacles that may hinder the transition, such as:

 Major stakeholders not being committed to the process, unconvinced of the need;  Lack of understanding that the safety case regime is a “process” to be undertaken by the duty holder and the workforce to improve understanding of the hazards, risks, and their controls, and to put in place measures for continuous improvement, rather than just creation of a “document”;  Lack of sufficient funding by government and industry; and  Lack of the necessary legislative timetable.

The transition to a safety case regime has significant challenges for both the duty holder and the regulator, including:

 The safety case report could be treated as a check-the-box exercise;  Documented safety management system does not reflect reality;  Poor identification of hazards and risks;  Poor understanding of the performance of control systems;  Attempting to justify existing controls rather than to seek opportunity to improve;  Insufficient workforce involvement in the process;  The safety case process is under-resourced;  The safety case report is “inaccessible” so the report simply lives on the shelf;  The regulator does not use the safety case report to inform the inspection or audit;  Limited requirement for the reporting of accidents, dangerous occurrences and precursors resulting in lack of comprehensive performance data; and  The regulator is under-resourced, technically challenged, poorly trained, has poor systems and procedures, and is inconsistent.

In implementing the safety case regime, there should be regard for the regulatory principles and frameworks which represent best practice. The underlying principles are:

 The legislation and regulation should be fit for purpose, not simply superimposed on existing prescriptive regulation;

485 See http://www.hse.gov.uk/research/rrpdf/rr823-summary-guide.pdf (accessed November, 1, 2013).

Chevron Richmond Refinery Regulatory Report May 2014

115

 Regulation should be effective and efficient; and  Industry should move away from a culture of compliance with detailed prescriptive regulation to one of involving the workforce in understanding the hazards.

Some significant points worth noting from international experience in setting up the regulation are:

 Staff should be recruited against detailed job descriptions and should cover the full range of technical, management and regulatory requirements;  Pay rates and terms and conditions should be sufficient to attract highly qualified staff;  A competency framework needs to be developed reflecting the required knowledge, skills, and experience required to undertake;  Appropriate training programs must be in place;  An electronic dedicated safety case assessment procedure which captures the detail of the process to be followed and records the background to the decision-making process will be needed. This helps ensure good quality, consistent, and transparent assessment and provides a database of information which is used for future validation/topic facility inspections. It also provides a comprehensive record of the process which can be used in the event of an appeal against an assessment decision;  An accident and dangerous occurrence data base will be needed to store knowledge and data to provide reference information and the capacity to analyze trends; and  An emergency reporting and response process is necessary to ensure all significant events are properly logged and dealt with.

Chevron Richmond Refinery Regulatory Report May 2014

116

Appendix D: CSB Staff Response to the Board’s Motion to Postpone issued on January 15, 2014 Background

On January 15, 2014, the CSB held a public meeting in Richmond, California, to present the draft Chevron Regulatory Report for a vote by the Board. In the first CSB Chevron Report (the Chevron Interim Report), which was approved by the Board on April 19, 2013, the CSB staff committed to investigating additional issues which would be presented in a final report on the incident. These issues included the regulatory oversight of petroleum refineries in California. Due to deployments to West, Texas, and Geismar, Louisiana, the CSB Chevron investigation team produced a second interim draft report focused solely on the regulation of petroleum refineries. At the Richmond public meeting, the Board moved to postpone a vote on the draft regulatory report in order for the CSB investigation staff to address additional issues raised concerning regulatory oversight of petroleum refineries and the proposed safety case regime. The CSB staff was given 120 days from the date of the public meeting to respond to the motion. The following document contains the CSB staff’s response.

I.

Does Cal/OSHA have sufficient authority to require timely abatement of hazards associated with serious and willful violations? CSB Investigations Staff Response:

Following the August 6th incident at the Chevron Richmond Refinery, Cal/OSHA cited Chevron for, among other things, failing to replace pipe clamps at the refinery, and ordered Chevron to replace those pipe clamps by a certain date. The CSB Chevron Interim Report states that Chevron has a history of frequently using leak repair clams to externally stop process fluid leaks, and that following discovery of the leak on the 4-sidecut piping prior to the incident, “Chevron hoped to forestall a shutdown by installing a leak repair clamp.”486 The CSB determined that Chevron had more than 100 clamps on hydrocarbon and other piping components containing hazardous flammable process fluids at the Richmond refinery and that reliance on such clamps to mitigate leaks “identifies serious questions about its mechanical integrity program.”487 The interim report, which was approved by the Board on April 19, 2013, committed to evaluating the Chevron Richmond Refinery’s use of clamps and its mechanical integrity program as they relate to the refinery’s process safety culture in the final CSB report on the Chevron incident.

A letter written by California Representative George Miller dated January 15, 2014, which was delivered to Chevron investigators at the January 15th public meeting, discussed Chevron’s use of clamps and expressed concern that some of the clamps have not been replaced, and will not be replaced until late

486 CSB. Chevron Interim Report. April 19, 2013; p 62. 487 Ibid.

Chevron Richmond Refinery Regulatory Report May 2014

117

Cal/OSHA safety violation if they appeal. According to Representative Miller, Chevron appealed its Cal/OSHA citations on February 19, 2013. In the letter Rep. Miller requested that given these facts, the CSB investigators should assess the issue of timely abatement, and consider making recommendations to the Legislature and Governor on this matter. The first question raised by the Board in its motion to postpone is the same as the first issue raised in Representative Miller’s letter. The CSB staff notes that while it has already committed to evaluating the use of clamps at the Chevron Richmond Refinery as it relates to mechanical integrity and process safety culture, we are not aware of a causal connection between the refinery’s use of the clamps to mitigate leaks and the August 6th incident. Regulatory bodies often cite companies for deficiencies following an incident that are not related to that incident. However, the CSB is directed under the Clean Air Act to “investigate (or cause to be investigated), determine and report to the public in writing the facts, conditions, and circumstances and the cause or probable cause” of an accidental release.488 (emphasis added). The CSB’s Board Order 040, Procedure G: Causal Analysis, discusses requirements of formal analysis tools that identify the multiple causes of an incident, including technical, organizational, and societal causes. Thus, while the CSB staff committed to analyzing the issue of clamps at the refinery as it pertains to safety culture, the staff did not analyze the usage of clamps and abatement in its regulatory report, as it was not determined to be causal and was therefore not within the scope of the regulatory investigation.

Should Contra Costa County Health Services have direct enforcement authority under the Industrial Safety Ordinance? CSB Investigations Staff Response:

This question mirrors the second issue Representative Miller raises in his letter – that enforcement under the Industrial Safety Ordinance (ISO) is through the District Attorney, while Contra Costa County has the authority to enforce the California Accidental Release Program (CalArp) regulations because CalArp is considered to be a CUPA program, while the ISO is not.

The CSB staff looked into this matter further, including interviewing key personnel, and determined that while having enforcement power is generally beneficial, a CSB recommendation on the issue is not warranted in this case, as Contra Costa County’s lack of enforcement authority under the ISO is not causal to the August 6th incident. According to Contra Costa County officials, the inspectors have never gone to the District Attorney to enforce the ISO. In addition, these officials have stated to the CSB that the Chevron Richmond Refinery has cooperated fully with past recommendations and has addressed any violations issued as a result of any audit conducted by Contra Costa County inspectors. While the CSB agrees that having enforcement power provides the regulator with another tool to ensure compliance with regulations, there is no causal connection to the August 6th incident and therefore no additional recommendation regarding this issue is warranted.

488 42 U.S.C. §7412 (r)(6)(C)(i) (1990).

Chevron Richmond Refinery Regulatory Report May 2014

118

Does Contra Costa County Health Services have sufficient resources to conduct comprehensive inspections and retain technically qualified personnel? CSB Investigations Staff Response:

This question mirrors the third issue brought up in Representative Miller’s letter – he would like to see additional resources allocated to the Contra Costa Hazardous Materials Program to allow for additional hiring of qualified inspectors. The draft report discusses on the bottom of page 90 the lack of resources and funding within the Contra Costa Hazardous Materials Program, which has limited its ability to hire additional highly qualified staff to oversee the petroleum refineries in Contra Costa County. The engineers are part of a bargaining unit and their salaries are paid through the county’s general fund, which has experienced annual budget reductions in the millions. Again, the CSB did not find that this lack of funding was necessarily causal to the incident. However, the CSB staff proposes to produce the following additional recommendations in the draft regulatory report for additional funding:

Mayor and City Council, City of Richmond, California

2012-03-I-CA-R21

Implement or cause to be implemented a compensation system to ensure the regulator has the ability to attract and retain a sufficient number of employees with the necessary skills and experience to ensure regulator technical competency. Periodically conduct a market analysis and benchmarking review to ensure the compensation system remains competitive with California petroleum refineries.

Board of Supervisors Contra Costa County, California

2012-03-I-CA-R22

Implement a compensation system to ensure the regulator has the ability to attract and retain a sufficient number of employees with the necessary skills and experience to ensure regulator technical competency. Periodically conduct a market analysis and benchmarking review to ensure the compensation system remains competitive with California petroleum refineries. 4. Does Contra Costa County Health Services have sufficient authority to require facilities to undertake feasible risk reduction measures, such as best practices, which go beyond minimum regulatory requirements?

CSB Investigations Staff Response:

This last question mirrors the fourth and final issue discussed by Representative Miller in his letter – the need to authorize Contra Costa regulators to require risk reduction measures that go beyond regulations. He requests that the CSB make recommendations to strengthen the ISO by authorizing the Contra Costa

Chevron Richmond Refinery Regulatory Report May 2014

119

County Hazardous Materials Program officials to require refineries to adopt best industry practices or standards as part of its tool kit.

The draft report discusses on page 89 that Contra Costa engineers conduct CalArp and ISO/RISO audits concurrently at each covered facility generally once every three years. The engineers are only able to audit against the regulatory requirements, and while they can issue “consider” action items to the facility recommending actions above and beyond regulatory requirements, they do this very infrequently.

The Chevron Interim Report addressed ISO regulatory deficiencies, including the fact that there is no required implementation of inherent safety (unlike in the safety case). The Interim Report issues recommendations R3, R4 and R6 and R7, which request the City of Richmond and Contra Costa County to revise the ISO to require damage mechanism hazard reviews and the documented use of inherently safer systems analysis and the hierarchy of controls “to the greatest extent feasible” in establishing safeguards for identified process hazards. The recommendations note that the goal shall be to drive the risk of major accidents to As Low As Reasonably Practicable, or ALARP.

The ISO is currently being revised to implement these recommendations, and should be finalized as early as June 2014. The revised regulatory language would require facilities to reduce risk to “the greatest extent feasible,” which is a concept that is very similar to ALARP. Contra Costa County will have the ability to issue guidance that elaborates on what will be required to achieve that standard.

The CSB staff believes that these recommendations cover the issue raised in this question, and no additional recommendations are warranted.

II.

Note: CSB staff members Don Holmstrom, Cheryl MacKenzie, and Amanda Johnson traveled to the United Kingdom (UK) with Board Member Mark Griffon March 4th through the 14th to gather additional information on how the safety case is implemented and enforced in the UK for both the onshore and offshore oil and gas industry. The information gathered was produced in a notes document that was sent via email to CSB employees and Board members on March 31, 2014, and discussed with all agency staff and the Board on April 15, 2014. The information gathered by the CSB staff is also reflected in the responses to Part II of the Board Motion.

The CSB staff shall convene a multidisciplinary expert panel (selected by the full Board), similar to the Baker Panel established after the BP Texas City incident, to provide the agency with an assessment of the following topics regarding regulating process safety in refineries in California:

available process safety performance data to evaluate the effectiveness of the safety case regulatory model for refineries. CSB Investigations Staff Response:

Chevron Richmond Refinery Regulatory Report May 2014

120

It is necessary first to address the issue of convening a panel. Creating a panel similar to the Baker Panel, which cost roughly $30 million (funds that were fully covered by BP), would require a considerable amount of time, money, and resources that the CSB cannot afford. In addition, there are a number of procedural steps that must be met in order to establish this type of panel, known as a Federal Advisory Committee Act, or FACA, committee -- drafting and approval of a charter (including publication in the Federal Register), selection of Panel Members, financial conflict checks for Panel Members, need to maintain Panel membership balance, public meeting notices, etc. An advisory committee under the FACA can be created only when it is essential to the performance of a duty or responsibility conveyed upon the executive branch by law or Presidential Directive. Finally, Executive Order 12838 issued by President Clinton ordered executive departments and agencies to refrain from creating or sponsoring a new advisory committee subject to FACA “unless the committee is required by statute or the agency head (a) finds that compelling considerations necessitate creation of such a committee, and (b) receives the approval of the Director of the Office of Management and Budget.489” The CSB staff advises that creating a panel in this instance is neither compelling nor feasible.

To address Question 1, it is important to note that the Chevron Regulatory Report Draft FAQ 4 addressed the data surrounding the safety case and the occurrence of accidents. The FAQ stated that UK Health and Safety Executive’s (HSE’s) Hydrocarbon Releases Database System (HCR)490 in the North Sea, which contains detailed voluntary information of over 4,000 hydrocarbon releases offshore from installations since 1992, shows the total number of hydrocarbon releases offshore to be on the decline. The draft report also stated on pages 57 and 58 that the Petroleum Safety Authority (PSA) in Norway conducts analysis of indicator data as well and produces results on its website. Its analysis showed a decreasing trend in the number of reported hydrocarbon leaks offshore between 2007 and 2010. According to the data the Oil & Gas UK is collecting, the number of hydrocarbon releases has decreased over the last three years (roughly cut in half), but now they are going back up again, and they working to determine why. This highlights the usefulness in the collection and publication of indicator data, and it helps the industry to work towards continuous improvement.

While in the UK, the CSB staff spoke with Peter Davidson of the UK Petroleum Industry Association (UKPIA), a trade association that represents 9 member companies in the downstream oil and gas industry. This includes seven onshore petroleum refineries and roughly 30 terminals in the UK.491 The CSB staff learned that API 754 was adopted by UKPIA for onshore facilities in the UK, except that it was improved by adding criteria for root causes, and a tier 3 for small fire was created. UKPIA collects indicator data annually from all facilities within the onshore downstream oil and gas sector, analyzes the data, and produces an external report that is published and shared with the companies and with the public on their website. A more detailed analysis is published internally, and it drives UKPIA’s agenda. The UKPIA’s most recent annual Statistical Review (2013 Statistical Review), which is currently available on the UKPIA website,492 includes a section entitled Process Safety, which UKPIA states was produced as one of the key objectives of the UKPIA’s commitment to process safety, and in response to improvements

489 Termination and Limitation of Federal Advisory Committees. Exec. Order No. 12838, 58 Fed. Reg. 28 (February 12, 1993). http://www.archives.gov/federal-register/executive-orders/pdf/12838.pdf (accessed April 3, 2014). 490 https://www.hse.gov.uk/hcr3/ (accessed April 3, 2014). 491 See http://www.ukpia.com/home.aspx for more information. 492 See http://www.ukpia.com/files/pdf/statsreview2013.pdf (accessed April 3, 2014).

Chevron Richmond Refinery Regulatory Report May 2014

121

being made post-Buncefield regarding the reporting of key process safety performance indicators. This section provides data based on the indicators gathered that are classified as Tier 1, Tier 2, and Tier 3. According to the published data, the number of Tier 1 and Tier 2 events at refineries has decreased between 2010 and 2012 as well as the number of Tier 1 fires or explosions by consequence and the number of Tier 2 events by consequence.493 They want more sharing and learning from incidents, and want to improve searchability of data on their website.

topics: a. What is the role of transparency and community involvement under this regime? Are safety case reports made public?

CSB Investigations Staff Response:

In Australia, a summary of the safety case report is made public. In the UK, the CSB staff has learned that prior to 9/11 a similar summary was made publicly available. However, due to security reasons post- 9/11, the UK ceased to make that summary available under a Secretary of State order. A redacted version is available through the FOIA process in the UK. For example, the Elgin installation safety case was made available through a FOIA request following the 2012 Elgin blowout incident. Seveso III, the EU directive that will be effective as of June 2015, will broaden the availability of information. Seveso III “strengthens a number of areas such as public access to information and standards of inspection….”494 As the Chevron Regulatory Report Draft notes, the Seveso II Directive is currently implemented in the UK through the Control of Major Accident Hazards (COMAH) Regulations. Seveso III will be implemented through new COMAH Regulations as of June 1, 2015.

According to the HSE, the European Commission updated the Seveso Directive in accordance with the Aarhus Convention on public information, public participation in decision-making, and access to justice on environmental matters. The changes will mean that “the level and quality of information for the public will need to be improved…[and] the information will need to be available electronically and kept up to date.”495 In addition, “[r]equests from the public to see a safety report will be considered on a case-by- case basis as the current Secretary of State Direction will no longer apply.”496 The HSE told the CSB that Seveso III also calls for public reports which show how the performance of industry has improved or worsened.

In addition, as mentioned above, the UKPIA publishes numerous documents, including statistical reviews containing data analysis on its website to aid in transparency and community awareness. The HSE told the CSB staff that there is also transparency in the way the HSE does its work. For example, the HSE enforcement decision processes for the safety case are available to the public online. The decision

493 Ibid at 44 – 46. 494 See http://www.hse.gov.uk/seveso/introduction.htm (accessed April 3, 2014). 495 See http://www.hse.gov.uk/seveso/public.htm (accessed April 3, 2014). 496 Ibid.

Chevron Richmond Refinery Regulatory Report May 2014

122

process for accepting or rejecting a safety case is also public. Oil & Gas UK stated to the CSB staff that they publish a list of incidents on their website that includes the name of the operator, the type of release, and the quantity. They also have data on safety critical backlog and other metrics on their website.

The level of transparency the team saw in the UK is much greater than in the US – the regulator’s activities, standards, data, and other information is made available online to the public and is part of how these groups are continuously working in the UK to improve process safety. The potential recommendation to California in the Chevron Regulatory Report Draft addresses the importance of transparency and community involvement, as it includes a provision to require “reporting of information to the public to the greatest extent feasible such as a summary of the safety report, the process hazard analysis, a list of safeguards implemented and standards utilized to reduce risk, and process safety indicators that demonstrate the effectiveness of the safeguards and management systems….”

b. How are workers empowered as part of the tripartite model? Have there been retaliatory actions taken against workers for their involvement, and what protective measures are in place?

CSB Investigations Staff Response:

The CSB staff spent one of its days in the UK at a launch of a workforce initiative of great importance called the Workforce Engagement Support Team, or WEST. WEST is a workforce-led organization with tripartite membership from industry, the workforce, unions, and the regulator with the goal of creating a single consistent workforce agenda. This event brought together hundreds of individuals from the offshore oil and gas industry, including safety representatives, unions, and the HSE. The CSB staff set up a booth at the event and held 30-minute sessions where we engaged in an open dialogue with attendees discussing workforce engagement and involvement issues offshore. The CSB staff heard a lot from workers and safety representatives about the various levels of workforce involvement. One individual stated that best practice was introduced by the safety case, and this does not exist with compliance-based regulation. Another person stated that if a safety case is deficient, that means there was likely a lack of workforce involvement. We heard that there is safety representative involvement in ALARP, bowtie development and review, hazard analysis, and other safety activities. We also heard that the level of involvement may depend on the culture of the installation. It was really a defining moment to experience this kind of open dialogue between different groups that have come together to work to improve safety offshore. The CSB staff has never seen this kind of communication or collaboration in the US.

In addition, two years ago Step Change launched the workforce engagement tool – a survey meant to measure workforce involvement and organizational culture of each offshore manned facility. Over 10,000 workers have taken the survey and the results are currently being analyzed. Workers at the WEST launch told the CSB that the surveys are helpful and allow each installation to drive forward and improve.

The potential recommendation in the Chevron Regulatory Report Draft reflects the importance of workforce involvement, as it proposes that California “[u]se[] a tripartite model where the regulator, the company, and the workers and their representatives play an equal and essential role in the direction of preventing major accidents.” The CSB has also noted that while workers do not have stop work authority

Chevron Richmond Refinery Regulatory Report May 2014

123

in the UK, they do in Norway. Unions in the UK, such as Jake Molloy with RMT, have argued for stop work authority for UK offshore workers. The CSB staff included language in its potential safety case recommendation to California reflecting the importance of this type of authority. The potential recommendation currently states: “The representatives should also have the authority to stop work that is perceived to be unsafe or that presents a serious hazard until the regulator intervenes to address the safety concern.”

c. Are safety committees mandatory or optional in non-union workplaces? How are safety committee members selected, and under what authority?

CSB Investigations Staff Response:

The Chevron Regulatory Report Draft discusses on page 54 the fact that the law in the UK provides for consultation with employees or their safety representatives on health and safety matters at both unionized and non-unionized onshore facilities under the Safety Representatives and Safety Committees Regulations 1977 and the Health and Safety (Consultation with Employees) Regulations 1996. It is important to note, however, that all onshore oil and gas facilities in the UK are unionized. These regulations go further than the OSHA PSM standard in that they provide for the election of safety representatives by workers to serve many health and safety-related functions, including investigating complaints and accidents, and carrying out inspections. The regulations also require employers to establish a safety committee when one is requested by at least two health and safety representatives.

According to the HSE offshore division, it is up to the companies to decide how much they involve workers. Safety representatives have the legal right to initiate their own investigations, conduct inspections, resolve hazard complaints, and participate in risk management reviews and the development of safety case reports. The HSE also stated that an issue has been the competency and sufficiency of training of the safety representatives, and as such, the HSE is initiating more training to improve the involvement of safety representatives.

The Chevron Regulatory Report Draft proposes that California develop a regulatory model and accompanying guidance based on these UK regulations, and that the elected representatives should have a legally recognized role that goes beyond consultation in activities such as the development of the safety report, process hazard analysis, management of change, incident investigation, audits and identification and effective control of hazards. Workforce participation practices should be documented by the company and submitted to the regulator.

d. Is there a public data base of incident and near miss reporting? How are process safety performance indicators developed and used? Are these made public?

CSB Investigations Staff Response:

As discussed above, UKPIA collects Tier 1, Tier 2, and Tier 3 indicator data annually from all facilities within the onshore downstream oil and gas sector, analyzes the data, and produces an external report that

Chevron Richmond Refinery Regulatory Report May 2014

124

is published online and shared with the companies and with the public on their website. A more detailed analysis is published internally, and it drives UKPIA’s agenda. According to the COMAH Process safety performance indicators Operational Delivery Guide, by the end of 2015 all COMAH sites will measure their performance using “key leading and lagging performance indicators.”497 The expectation for COMAH sites as noted in this document is as follows:

– Have a programme for PSPIs [process safety performance indicators] – as one of the main ways the adequacy and performance of PS risk is managed, – PSPI’s are linked to effective Process Safety Leadership and should be used to inform high level decision making, – KPIs should be set according to risk profile of the activities undertaken – Adopt both Outcome (lagging) and Activity (leading) indicators, – Use the findings from the KPI programme to drive improvements on site, and – share sector performance data with the CA as part of a dialogue about performance.498

Inspectors are expected to monitor progress made towards the development of these indicators every 12 months and ensure it is “based on sound decisions/information.”499

Offshore, the HSE collects major accident data, hydrocarbon releases, and dangerous occurrence data. The offshore industry also collects a number of indicators and voluntarily provides them to Oil & Gas UK for annual industry data analysis. This data includes hydrocarbon releases, safety critical maintenance backlog, the number of failure identified by third party verification, the number of operational risk assessments in place, and employee involvement (scores of each facility based on safety culture survey). During the regulator’s inspection process, also known as the intervention, the HSE can ask for information on the company’s indicator’s system and for all of this industry-wide key performance indicators (KPI) data. The Oil & Gas UK is looking at what else could be usefully collected, and they are working on sharing more information. They want more sharing and learning from incidents, and want to improve searchability of data on their website. According to the data the Oil & Gas UK is collecting, the number of hydrocarbon releases has decreased over the last three years (roughly cut in half), but now they are going back up again, and they working to determine why. This highlights the usefulness in the collection and publication of indicator data, and it helps the industry to work towards continuous improvement.

e. How are standards for minimum levels of risk set (ALARP presumably goes beyond minimum levels)?

CSB Investigations Staff Response:

497 COMAH Competent Authority Workstream 2e, Process safety performance indicators (Operational Delivery Guide); p 3. http://www.hse.gov.uk/comah/guidance/process-safety-performance-indicators.pdf (accessed April 14, 2014). 498 Ibid. 499 Ibid.

Chevron Richmond Refinery Regulatory Report May 2014

125

For both the onshore and offshore safety case regime, a majority of the time ALARP is determined by existing best practices or standards. The regulator does have the ability to require a company to go above and beyond best practice to reduce risk. According to the HSE onshore division, ALARP is an active process and dialogue between inspectors and the duty holder. It is not simply a paper exercise; there is rigorous back and forth. The initial calculation of ALARP by the duty holder onshore is quantitative. Then the question becomes, “can I/you do more to reduce risk?” There is a risk carrot posted on the HSE website that illustrates the goal of moving risk down toward the bottom of the carrot. The aim is to get to the broadly acceptable risk level, which usually involves both quantitative and qualitative analysis tools. According to Peter Davidson of UKPIA, there has been increased focus onshore on ALARP since the 2005 Buncefield incident. If a new standard does come into existence, an existing facility must do a quantitative and qualitative gap analysis to demonstrate whether they can effectively mitigate risk without following the new standard.

A lead inspector with HSE onshore told the CSB staff that he has an initial safety report rejection rate of almost 100 percent, and that there is an ongoing dialogue/negotiation that occurs between the regulator and the duty holder as to reduction of risk. This ongoing dialogue of risk assessment and reduction was said to be more valuable than the safety report itself. As such, the credibility, persuasiveness, and personal communication are key attributes of HSE inspectors.

f. What are the enforcement methods used by regulators under the safety case?

CSB Investigations Staff Response:

Post-Buncefield, the HSE onshore stated to the CSB that they greatly emphasize interventions, or inspections, to ensure that companies are fulfilling their safety reports. Roughly 70 percent of an HSE onshore inspector’s time is spent inspecting. They greatly emphasized to the CSB staff importance of the inspections and dialogue between the inspector and the duty holder rather than the safety report document itself. They stated that the rest of an inspector’s time is spent on safety report assessment, investigation, and enforcement. To begin the safety report review process, the HSE initially assesses ALARP and the risks/hazards. They screen to see what they have and where, onsite and offsite, worst case scenarios, ALARP demonstration/analysis. Next the inspector(s) look at the measures and controls in place. This is done by discipline – process safety, human factors, etc. Inspectors use the Safety Report Assessment Manual (SRAM) as a guide during an assessment. This guide is also provided to duty holders. Next, the inspectors come back together after they have assessed the report for a conclusions meeting. They discuss whether there are any “serious deficiencies” in the report. A mechanical integrity issue is often a serious deficiency. If there are serious issues, the HSE will issue a formal improvement notice for the company to address any deficiencies. Issuing such a notice requires “clear evidence.”

If the HSE issues a COMAH prohibition notice, this stops a process in its tracks based on a serious deficiency. This results in the shutdown of the site. HSE issues three or four of these each year. Few regulators in the US have this direct power (Cal/OSHA does).

Chevron Richmond Refinery Regulatory Report May 2014

126

The initial safety report assessment helps form the HSE’s intervention plan for the facility. The HSE inspector uses this plan during the verification and inspection of the facility on site. Here, the HSE inspector can tell whether the company is actually doing what they say they are in their safety report. As discussed above, roughly 70 percent of an HSE inspector’s time is spent on inspections. Most inspections are planned, because inspectors review complex issues that require site specialists to be present during the inspections.

Each site visit has a detailed agenda and is provided to the facility roughly four weeks in advance of the visit. The HSE conducts 10 to 15 inspections per refinery per year; this results in an inspection report. The Goal is to inspect every COMAH facility once every three years; high hazard profile sites once per year, and refineries are visited monthly due to the regulator’s assessment of higher risk at refineries.

Offshore, the HSE can issue a prohibition notice if there is an immediate risk and “potential” for injury. During an appeal, this notice remains in effect. The HSE can also issue improvement notices that give the duty holder a period of time to make specific improvements. If they fail to make those improvements, the operation is stopped. Notices are placed on a public database once any appeal of a notice is resolved.

g. What are the key transition issues that were addressed with facilities in operation at the time the safety case was adopted?

CSB Investigations Staff Response:

The Chevron Regulatory Report Draft discusses key transition issues in FAQ 6 on pages 114-115. Major issues include lack of sufficient funding, lack of stakeholder commitment to the process, under resourcing of the safety case process, the regulator is poorly trained or technically challenged, and insufficient workforce involvement in the process.

It is also important to note that the CSB staff learned a lot of positives about the onshore COMAH and safety report process in the UK. For example, the staff learned that as a result of the Buncefield incident there has been an increased focus on inspections, there was a Process Safety Leadership Group formed that works to improve safety and share lessons learned, and there is more focus on ALARP. In addition, the staff learned from industry representatives that HSE onshore has a better reputation than HSE offshore in terms of inspections and challenging from the inspectors. HSE onshore is said to have a more robust, structured, inspection program, whereas HSE offshore needs to improve in that area. Overall, the CSB staff came away with a very positive view of the HSE onshore regime and COMAH. The amount of work that is put into continuous improvement, transparency, and workforce involvement is incomparable to what currently exists in the US.

As a result of the Board’s motion and expressed concerns regarding the proposed recommendation, the CSB staff proposes the following restructured proposed recommendations for the state of California.

California State Legislature,

Chevron Richmond Refinery Regulatory Report May 2014

127

Governor of California

2012-03-I-CA-R23

Based on the findings in this report, which detail effective features of chemical accident prevention regimes in other parts of the world, augment your existing process safety management regulations with a more rigorous regime that contains the following features:

a. A comprehensive process safety report written by the company that includes a systematic analysis and documentation of all major hazards and effective control methods implemented to reduce those risks to as low as reasonably practicable (ALARP);

b. A thorough review of the process safety report by technically competent regulatory personnel that requires modifications and improvements to the document as necessary prior to acceptance;

c. Audits and preventative inspections by the regulator to verify effective implementation of risk reduction measures;

d. A risk management approach that requires analysis and effective implementation of safeguards, using the hierarchy of controls, to protect people and the environment from major accident hazards. The effectiveness of the safeguards will be demonstrated through the use of leading and lagging process safety indicators;

e. Ability to adapt and implement safety requirements in response to newly identified hazards, advances in technology, lessons learned from major accidents, and improved safety codes without the need for new rule-making;

f. Determines when new or improved industry standards and practices are needed and initiates programs and other activities such as forums to prompt the timely development and implementation of such standards and practices;

g. Uses a tripartite model where the regulator, the company, and workers and their representatives play an equal and essential role in the direction of preventing major accidents;

h. A regulatory model and accompanying guidance based on the findings contained within this report on workforce engagement, which set out the legal framework for the rights and responsibilities of workers and their representatives on health and safety-related matters, and the election of safety representatives and establishment of safety committees (with equal representation between management and labor) to serve health and safety-related functions. The elected representatives should have a legally recognized role that goes beyond consultation in activities such as the development of the process safety report, process hazard analysis, management of change, incident investigation, audits, and identification and effective control of hazards. The representatives should also have the authority to stop work that is perceived to be unsafe or that presents a serious hazard until the regulator intervenes to resolve the safety concern. Workforce participation practices should be documented by the company to the regulator;

Chevron Richmond Refinery Regulatory Report May 2014

128

i. Requires reporting of information to the public to the greatest extent feasible such as a summary of the process safety report, the process hazard analyses, a list of safeguards implemented and standards utilized to reduce risk, and process safety indicators that demonstrate the effectiveness of the safeguards and management systems;

j. An independent, well-funded, well-staffed, technically competent regulator; and

k. A compensation system to ensure the regulator has the ability to attract and retain a sufficient number of employees with the necessary skills and experience to ensure regulator technical competency. Periodically conduct a market analysis and benchmarking review to ensure the compensation system remains competitive with California petroleum refineries.

2012-03-I-CA-R24

To further implementation of the rigorous process safety scheme referenced in Recommendation 23, study or cause to be studied and implement the findings addressing issues and obstacles of implementation of a more rigorous regime such as transition, resources, funding, and methods to enhance transparency, community involvement, effective worker participation, and protecting workers from retaliatory action.

2012-03-I-CA-R25

Work with the regulator, the petroleum refining industry, labor, and other relevant stakeholders in the state of California to develop and implement a system that collects, tracks, and analyzes process safety leading and lagging indicators from operators and contractors to promote continuous safety improvements. At a minimum, this program shall:

a. Require the use of leading and lagging process safety indicators to actively monitor the effectiveness of process safety management systems and safeguards for major accident prevention. Include leading and lagging indicators that are measureable, actionable, and standardized. Require that the reported data be used for continuous process safety improvement and accident prevention;

b. Analyze data to identify trends and poor performers and publish annual reports with the data at facility and corporate levels;

c. Require companies to publicly report required indicators annually at facility and corporate levels;

d. Use process safety indicators (1) to drive continuous improvement for major accident prevention by using the data to identify industry and facility safety trends and deficiencies and (2) to determine appropriate allocation of regulator resources and inspections; and

Chevron Richmond Refinery Regulatory Report May 2014

129

e. Be periodically updated to incorporate new learning from world-wide industry improvements in order to drive continuous major accident safety improvements in California.

FD06454 | 2012_美国_final-investigation-report---chevron-refinery-and-fire.pdf

分类:06_境外及港澳台调查报告 | 年份:2012 | 地域: | 严重程度: | 场所: | 起火原因: | 来源格式:pdf

U.S. CHEMICAL SAFETY AND HAZARD INVESTIGATION BOARD 

FINAL INVESTIGATION REPORT

REPORT NO. 2012-03-I-CA JANUARY 2015

CHEVRON RICHMOND REFINERY PIPE RUPTURE AND FIRE

CHEVRON RICHMOND REFINERY #4 CRUDE UNIT RICHMOND, CALIFORNIA KEY ISSUES: AUGUST 6, 2012  CHEVRON PROCESS SAFETY PROGRAMS  CHEVRON EMERGENCY RESPONSE  MECHANICAL INTEGRITY INDUSTRY STANDARD DEFICIENCIES  LEAK EVALUATION AND RESPONSE INDUSTRY STANDARD DEFICIENCIES

Chevron Richmond Refinery Investigation Report January 2015 ii U.S. CHEMICAL SAFETY AND HAZARD INVESTIGATION BOARD

[This page intentionally left blank.]

Chevron Richmond Refinery Investigation Report January 2015 iii U.S. CHEMICAL SAFETY AND HAZARD INVESTIGATION BOARD

Table of Contents 1.0  Executive Summary ......................................................................................................................... 1  1.1  Incident Summary .............................................................................................................................. 1  1.2 Chevron Interim Report ..................................................................................................................... 2 1.3  Chevron Regulatory Report .............................................................................................................. 4  1.4  Chevron Final Investigation Report ................................................................................................... 5  1.4.1  Technical Findings .................................................................................................................... 5  1.4.2  Organizational Findings ............................................................................................................ 7  1.4.3  Emergency Response Findings ............................................................................................... 12  1.4.4  Safety Culture Findings .......................................................................................................... 13  1.4.5  Industry Codes and Standards Findings .................................................................................. 14  1.4.6  Regulatory Findings ................................................................................................................ 14  1.5  Recommendations ............................................................................................................................ 15  2.0  Richmond Refinery Process Description ..................................................................................... 17  2.1  Chevron Background ....................................................................................................................... 17  2.2  Richmond Refinery .......................................................................................................................... 17  2.3  #4 Crude Unit ................................................................................................................................... 18  2.4  4-Sidecut Line .................................................................................................................................. 19  3.0  The Incident .................................................................................................................................... 22  3.1  Leak Discovery ................................................................................................................................ 22  3.2  Leak Response ................................................................................................................................. 25  3.3  Consequences ................................................................................................................................... 29  4.0  Technical Analysis ......................................................................................................................... 34  4.1  Sulfidation Corrosion ....................................................................................................................... 34  4.2  Sulfidation Corrosion Inspection Techniques .................................................................................. 41  4.3  Silicon Characterization Techniques ............................................................................................... 43  4.4  Inherently Safer Design ................................................................................................................... 45  5.0  Incident Analysis ............................................................................................................................ 48  5.1  Organizational Analysis ................................................................................................................... 50  5.1.1  Chevron Energy Technology Company .................................................................................. 53  5.1.1.1  ETC Sulfidation Failure Prevention Guidance ................................................................... 54  5.1.1.2  Chevron ETC Conclusions .................................................................................................. 56  5.1.2  Chevron Turnaround Management ......................................................................................... 58 

Chevron Richmond Refinery Investigation Report January 2015 iv U.S. CHEMICAL SAFETY AND HAZARD INVESTIGATION BOARD

  1. 1.2.1 

2007 Crude Unit Turnaround .............................................................................................. 59  5.1.2.1.1  Recommendations Regarding 4-Sidecut Line for 2007 Turnaround .......................... 60  5.1.2.2  2011 Crude Unit Turnaround .............................................................................................. 64  5.1.2.2.1  Recommendations Regarding 4-Sidecut Line for 2011 Turnaround .......................... 65  5.1.2.3  Chevron Richmond Refinery Turnaround-Planning Conclusions ...................................... 66  5.1.3  Chevron Unit Reliability Improvement Process ..................................................................... 68  5.1.4  Chevron Fixed Equipment Reliability Business Improvement Network ................................ 71  5.1.5  Chevron Minimum Pipe Thickness Program .......................................................................... 74  5.1.6  Chevron Process Safety Indicators Program ........................................................................... 78  5.1.7  Stop Work Authority ............................................................................................................... 79  5.1.8  Chevron Organizational Conclusions ..................................................................................... 83  5.2  Industry Sulfidation Corrosion Guidance ........................................................................................ 85  5.2.1 API RP 939-C: Guidelines for Avoiding Sulfidation (Sulfidic) Corrosion Failures in Oil Refineries ....................................................................................................................................... 85  5.2.2 API RP 571: Damage Mechanisms Affecting Fixed Equipment in the Refining Industry ..... 89  5.2.3  API 570: Piping Inspection Code: In-Service Inspection, Rating, Repair, and Alteration of Piping Systems ........................................................................................................................ 90  5.2.4  API RP 578: Material Verification Program for New and Existing Alloy Piping Systems .... 91  5.2.5  API RP 574: Inspection Practices for Piping System Components ........................................ 91  5.3  Chevron Emergency Response to Process Leaks ............................................................................. 92  5.3.1  Area Control and Hazardous Area Assessment ...................................................................... 92  5.3.2  Miscommunication regarding 4-sidecut properties ................................................................. 93  5.3.3  Leak Mitigation and Discovery Attempts Worsened Leak ..................................................... 94  5.3.4  Chevron’s New Leak Response Protocol ................................................................................ 97  5.3.5  Leak Response Conclusions .................................................................................................. 100  5.4  Industry Leak Response Guidance ................................................................................................. 100  5.4.1  API RP 574: Inspection Practices for Piping System Components ...................................... 100  5.4.2  API RP 2001: Fire Protection in Refineries ......................................................................... 101  5.4.3  API 570: Piping Inspection Code: In-Service Inspection, Rating, Repair, and Alteration of Piping Systems ...................................................................................................................... 103  5.4.4  ASME PCC-2-2011: Repair of Pressure Equipment and Piping .......................................... 103  5.4.5  Industry Leak Response Guidance Conclusions ................................................................... 104  5.5  Chevron Richmond Refinery Safety Culture ................................................................................. 104  5.5.1  Normalization of Deviance ................................................................................................... 105 

Chevron Richmond Refinery Investigation Report January 2015 v U.S. CHEMICAL SAFETY AND HAZARD INVESTIGATION BOARD

  1. 5.2 

Chevron Richmond Refinery Safety Culture Surveys .......................................................... 106  5.5.2.1  Stop Work Authority Safety Culture Survey Responses .................................................. 107  5.5.2.2  Mechanical Integrity Safety Culture Survey Responses ................................................... 108  5.5.2.3  Process Safety Analysis Safety Culture Survey Responses .............................................. 109  5.5.2.4  Regulator Overview of Safety Culture Survey Action Items ............................................ 110  6.0  Recommendations ........................................................................................................................ 112  6.1  American Petroleum Institute ........................................................................................................ 112  6.2  American Society of Mechanical Engineers .................................................................................. 115  6.3  Chevron USA ................................................................................................................................. 115  6.4  Board of Supervisors, Contra Costa County, California ................................................................ 116  6.5  Mayor and City Council, City of Richmond, California ................................................................ 116  Appendix A—Chevron Leak Response Protocol Developed Post-incident ............................................. 117  Appendix B—Contra Costa County Community Warning System .......................................................... 120  Appendix C—Usage of Clamps at Chevron Richmond Refinery ............................................................ 121 

Chevron Richmond Refinery Investigation Report January 2015 vi U.S. CHEMICAL SAFETY AND HAZARD INVESTIGATION BOARD

List of Figures Figure 1. To-scale schematic of 4-sidecut piping identifying key wall thickness values. ....................... 11  Figure 2. Aerial view of the Chevron Richmond Refinery. ..................................................................... 18  Figure 3. Schematic of C-1100 Crude Unit atmospheric column and upstream process equipment. ...... 20  Figure 4. 4-sidecut line configuration and rupture location. .................................................................... 21  Figure 5. Photo of rupture on 4-sidecut 52-inch component. .................................................................. 22  Figure 6. CSB animation depicting operator identifying the leaking 4-sidecut pipe. .............................. 23  Figure 7. Photo taken of the leaking 4-sidecut pipe on August 6, 2012, at the Chevron Richmond Refinery ..................................................................................................................................... 24  Figure 8. Timeline of events on August 6, 2012. ...................................................................................... 25  Figure 9. Example leak repair clamp for piping. It is installed over the leak location to prevent process fluid leakage to the atmosphere. ............................................................................................... 26  Figure 10. CSB animation of contractors erecting scaffolding beneath the leak location. ........................ 27  Figure 11. CSB animation of firefighters attempting to remove the 4-sidecut insulation, the resulting fire, and fire extinguishing. ............................................................................................................... 28  Figure 12. CSB animation of firefighters who dropped to their hands and knees to escape the vapor cloud. ......................................................................................................................................... 29  Figure 13. CSB animation of firefighter who was inside the fire engine when the light gas oil ignited. .. 31  Figure 14. Photo of the burned remains of the fire truck that was consumed by the fire. .......................... 32  Figure 15. Initial vapor cloud formation (white cloud) and subsequent ignition (black smoke) as seen from a pier in San Francisco, California. ........................................................................................... 33  Figure 16. Vapor cloud and ignition seen from Marin County. ................................................................. 34  Figure 17. Graph of sulfidation corrosion rates with respect to silicon content in carbon steel ................. 36  Figure 18. Locations of metallurgical samples taken from 8-inch 4-sidecut piping post-incident. ........... 38  Figure 19. Locations of metallurgical samples taken from 12-inch 4-sidecut piping post-incident. ......... 39  Figure 20. 4-sidecut piping sample (E-017-8) analyzed by Anamet Labs showing the relative thickness of low silicon piping on the left and the high silicon piping on the right. ..................................... 40  Figure 21. CML placement on 8-inch 4-sidecut piping. ............................................................................. 42  Figure 22. Modified McConomy Curves from API RP 939-C. .................................................................. 45  Figure 23. Hierarchy of controls ................................................................................................................. 46  Figure 24. Acci-Map of August 6, 2012, Chevron Refinery Fire. .............................................................. 49  Figure 25. Organizational decision-making schematic showing attempts to have carbon steel 4-sidecut piping 100 percent component inspected or replaced with a higher chromium steel alloy ...... 50  Figure 26. Key events at the Richmond refinery between 2002 and 2012. ............................................... 51  Figure 27. Chevron Corporation refinery process safety programs. .......................................................... 52  Figure 28. Chevron Energy Technology Company (ETC) organizational roles ........................................ 54  Figure 29. Presentation slide of ETC training course that guided refinery staff to perform 100 percent component inspection on high-temperature lines susceptible to sulfidation corrosion. ............ 55  Figure 30. Presentation slide of ETC training course that guided refinery staff on ways to reduce risk from sulfidation corrosion. ........................................................................................................ 56  Figure 31. Work list criteria requirements specified in the Framing Document used during Chevron’s 2007 Crude Unit turnaround. .................................................................................................... 60 

Chevron Richmond Refinery Investigation Report January 2015 vii U.S. CHEMICAL SAFETY AND HAZARD INVESTIGATION BOARD

Figure 32. Sample Inspection Database report analyzed by unit inspectors when determining piping remaining life and when making piping replacement recommendations .................................. 61  Figure 33. Crude column schematic indicating the piping downstream of the 4-sidecut pumps that was replaced during the 2007 Crude Unit turnaround ..................................................................... 63  Figure 34. Work list criteria requirements specified in the Framing Document used during Chevron’s 2011 Crude Unit turnaround. .................................................................................................... 64  Figure 35. Presentation slide showing corporate reliability leader’s findings that the Richmond Refinery was not complying with the ETC Sulfidation Failure Prevention Initiative. ............................ 73  Figure 36. To-scale schematic of 4-sidecut piping original wall thickness (0.322-inch), Minimum Alert Thickness (0.13-inch), and Minimal Required Thickness (0.11-inch) using API RP 574 default values. ....................................................................................................................................... 75  Figure 37. Text from Chevron design engineer indicating structural minimum thickness (t(min)) calculation results for small sections of suction piping upstream of the 4-sidecut pumps. ...... 76  Figure 38. Photo from API RP 939-C of a low-silicon pup piece that ruptured at a BP refinery .............. 86  Figure 39. Schematic from API RP 939-C of the piping shown in Figure 38. .......................................... 87  Figure 40. Photo of undamaged (top) and burned during incident (bottom) pike pole used in early attempts to remove 4-sidecut insulation. ................................................................................... 95  Figure 41. Photo showing that tip of fire pole matches apparent puncture location in failed 52-inch component of 4-sidecut piping. ................................................................................................. 96  Figure 42. Ideal communication flow to Incident Commander during refinery process fluid leak incident. .................................................................................................................................................................... 98  Figure 43. Chevron’s new Leak Response Protocol, developed post-incident .......................................... 99 

Chevron Richmond Refinery Investigation Report January 2015 viii U.S. CHEMICAL SAFETY AND HAZARD INVESTIGATION BOARD

List of Tables Table 1. Silicon characterization technique. .............................................................................................. 43  Table 2. Total number of employees surveyed and job functions of respondents in 2008 and 2010 Chevron Richmond Refinery staff safety culture surveys. ......................................................... 106  Table 3. Chevron Richmond Refinery 2008 Safety Culture Survey responses to question of “Stopping Unsafe Work” by operators and mechanics ............................................................................... 107  Table 4. Chevron Richmond Refinery 2008 and 2010 Safety Culture Survey responses to question of “Stopping Unsafe Work” by managers and engineers ............................................................... 108  Table 5. Chevron Richmond Refinery 2008 and 2010 Safety Culture Survey responses to question of “How do people feel about stopping unsafe work?” by operators and mechanics ..................... 108  Table 6. Chevron Richmond Refinery 2008 and 2010 Safety Culture Survey responses to the question: “How do we take care of equipment?” ....................................................................................... 109  Table 7. Chevron Richmond Refinery 2008 and 2010 Safety Culture Survey responses to the question “Process Safety Issues Are…” .................................................................................................. 109 

Chevron Richmond Refinery Investigation Report January 2015 ix U.S. CHEMICAL SAFETY AND HAZARD INVESTIGATION BOARD

Acronyms and Abbreviations ⁰C degrees Celsius ⁰F degrees Fahrenheit ABU Area Business Unit A/C Additional Considerations AcciMap Accident Map API American Petroleum Institute API 570 Piping Inspection Code: In-Service Inspection, Rating, Repair, and Alteration of Piping Systems API RP 2001 Fire Protection in Refineries API RP 571 Damage Mechanisms Affecting Fixed Equipment in the Refining Industry API RP 574 Inspection Practices for Piping System Components API RP 578 Material Verification Program for New and Existing Alloy Piping Systems API RP 754 Process Safety Performance Indicators for the Refining and Petrochemical Industries API RP 939-C Guidelines for Avoiding Sulfidation (Sulfidic) Corrosion Failures in Oil Refineries API RP API Recommended Practice ASME American Society of Mechanical Engineers ASME PCC-2-2011 Repair of Pressure Equipment and Piping ASTM American Society for Testing and Materials bpd barrels per day C/A Corrective Actions CML Condition Monitoring Location Cr Chromium CS Carbon Steel CSB U.S. Chemical Safety and Hazard Investigation Board CWS Community Warning System DRB Decision Review Board ETC Chevron Energy Technology Company FER BIN Fixed Equipment Reliability Business Improvement Network IMPACT Initiative for Managing Pacesetter Turnarounds ISO Industrial Safety Ordinance Mo Molybdenum

Chevron Richmond Refinery Investigation Report January 2015 x U.S. CHEMICAL SAFETY AND HAZARD INVESTIGATION BOARD

MOC Management of Change NFPA National Fire Protection Association NFPA 471 Recommended Practice for Responding to Hazardous Materials Incidents OERI Operational Excellence and Reliability Intelligence PHA Process Hazard Analysis PMI Positive Material Identification PPE Personal Protective Equipment psig pounds per square inch gauge PSM Process Safety Management RAGAGEP Recognized and Generally Accepted Good Engineering Practices RISO Richmond Industrial Safety Ordinance RLOP Richmond Lube Oil Project RT Radiographic Testing S/D Shutdown Si Silicon SIP shelter-in-place SIS Safety Instrumented Systems SME Subject Matter Expert STL Shift Team Leader SWA Stop Work Authority T-min minimum thickness TML Thickness Measurement Location or Thickness Monitoring Location TOP Triangle of Prevention URB Unit Reliability Brief URIP Unit Reliability Improvement Process UT Ultrasonic Testing

Chevron Richmond Refinery Investigation Report January 2015 1 U.S. CHEMICAL SAFETY AND HAZARD INVESTIGATION BOARD

  1. 0 Executive Summary
  2. 1 Incident Summary

On August 6, 2012, the Chevron U.S.A. Inc. Refinery in Richmond, California (“the Chevron Richmond Refinery”) experienced a catastrophic pipe rupture in the #4 Crude Unit. The incident occurred from piping referred to as the “4-sidecut” stream, one of several process streams exiting the refinery’s C-1100 Crude Unit Atmospheric Column.1 The pipe rupture occurred on a 52-inch long component2 of the 4- sidecut 8-inch line (the 52-inch component). At the time of the incident, light gas oil3 was flowing through the 8-inch line at a rate of approximately 10,800 barrels per day (bpd).4 The ruptured pipe released flammable, high temperature light gas oil, which then partially vaporized into a large, opaque vapor cloud that engulfed 19 Chevron U.S.A. Inc. (Chevron) employees.5 At 6:33 p.m., approximately two minutes following the release, the released process fluid ignited.6 Eighteen of the employees safely escaped from the vapor cloud just before ignition; one employee, a Chevron refinery firefighter, was inside a fire engine that was caught within the fireball when the process fluid ignited. Because he was wearing full-body fire-fighting protective equipment, he was able to make his way through the flames to safety. Six Chevron employees suffered minor injuries during the incident and subsequent emergency response efforts. The release, ignition, and subsequent burning of the hydrocarbon process fluid resulted in a large plume of vapor, particulates, and black smoke, which traveled across the surrounding area. This chain of events resulted in a Community Warning System (CWS) Level 3 alert,7 and a shelter-in-place8 advisory (SIP) was issued at 6:38 p.m.9 for the cities of Richmond, San Pablo, and North Richmond. It was lifted later

1 The atmospheric column separates crude oil feed into different streams through distillation. These streams are further processed in other units in the refinery. The location of the 4-sidecut, light gas oil stream was shown in Figure 4 (page 12) of the Interim Investigation Report Chevron Richmond Refinery Fire. See http://www.csb.gov/assets/1/19/Chevron_Interim_Report_Final_2013-04-17.pdf (accessed January 21, 2015). 2 “Component” refers to a portion of piping between welds. It includes straight run piping and pipe fittings. 3 Light gas oil is a component of crude oil with a boiling point range between 401°F and 653°F. 4 This quantity is the equivalent of 315 gallons per minute (gpm). A barrel is equivalent to 42 gallons. 5 This number is based on statements made to the CSB by each of the 19 employees caught in the vapor cloud. 6 Surveillance footage was provided by Chevron. Chevron clarified to the CSB that the video time stamp is approximately 5 minutes out of sync. The video is available at http://www.csb.gov/videoroom/detail.aspx?VID=69 (accessed February 8, 2013). 7 A Community Warning System Level 3 alert indicates that a facility within Contra Costa County has had a release that has offsite impact and is categorized by any of the following conditions:

  1. Off-site impact that may cause eye, skin, nose and/or respiratory irritation to the general population.
  2. Fire, explosion, heat, or smoke with an off-site impact. Example: On a process unit/storage tank where

mutual aid is requested to mitigate the event and the fire will last longer than 15 minutes.

  1. Hazardous material or fire incident where the Incident Commander or unified command, through

consultation with the Contra Costa Health Services Hazardous Material Incident Response Team, requests that sirens should be sounded. See http://cchealth.org/hazmat/pdf/incident_notification_policy.pdf (accessed April 9, 2013). 8 Contra Costa County considers a shelter-in-place to include going inside a home or nearest building, closing doors and windows, and turning off heating, ventilation, and air conditioning. See http://cchealth.org/emergencies/shelter- in-place.php (accessed February 6, 2013). 9 Chevron U.S.A. Inc. "30 Day Follow-Up Notification Report," September 5, 2012.

Chevron Richmond Refinery Investigation Report January 2015 2 U.S. CHEMICAL SAFETY AND HAZARD INVESTIGATION BOARD

that night, at 11:12 p.m., after the fire was fully under control. In the weeks following the incident, approximately 15,000 people from the surrounding communities sought medical treatment at nearby medical facilities for ailments including breathing problems, chest pain, shortness of breath, sore throat, and headaches. Approximately 20 of these people were admitted to local hospitals as inpatients for treatment.10 1.2 Chevron Interim Report The U.S. Chemical Safety Board (CSB) released its first report on the Chevron incident in April 2013 (“the Interim Report”), which highlighted technical findings and safety system deficiencies. The report issued recommendations to Chevron; the city of Richmond, California; Contra Costa County, California; the State of California; the California Air Quality Management Divisions; the California Environmental Protection Agency; and the U.S. Environmental Protection Agency, summarized below. As of January 2015, these groups have made progress in implementing the recommendations, summarized below, to improve the regulatory requirements for petroleum refineries in California.

Chevron U.S.A (Urgent) At all Chevron U.S. refineries and as part of the Process Hazard Analysis cycle, engage a diverse team of qualified personnel to perform a documented damage mechanism hazard review that identifies potential process damage mechanisms and consequences of failure and ensures safeguards are in place to control hazards presented by those damage mechanisms. Include in this review applicable industry best practices, Chevron Energy Technology Company findings and recommendations, and inherently safer systems to the greatest extent feasible. Report leading and lagging process safety indicators at all California Chevron U.S.A. refineries to the applicable regulatory agencies.

Mayor and City Council, City of Richmond, California; Board of Supervisors, Contra Costa County, California; California State Legislature, Governor of California Require that Process Hazard Analyses include documentation of the recognized methodologies, rationale and conclusions used to claim that safeguards intended to control hazards will be effective. Require the documented use of inherently safer systems analysis and the hierarchy of controls to the greatest extent feasible in establishing safeguards for identified process hazards. The goal shall be to drive the risk of major accidents to As Low As Reasonably Practicable (ALARP).

California State Legislature, Governor of California Require California petroleum refineries to engage a diverse team of qualified personnel to perform a documented damage mechanism hazard review as part of the Process Hazard Analysis cycle that identifies potential process damage mechanisms and consequences of failure and ensures safeguards are

10 Based on information provided to the CSB by local hospitals.

Chevron Richmond Refinery Investigation Report January 2015 3 U.S. CHEMICAL SAFETY AND HAZARD INVESTIGATION BOARD

in place to control hazards presented by those damage mechanisms. Require the analysis and incorporation of applicable industry best practices and inherently safety systems to the greatest extent feasible into this review. For all California oil refineries, identify and require the reporting of leading and lagging process safety indicators, such as the action item completion status of recommendations from damage mechanism hazard reviews, to state and local regulatory agencies that have chemical release prevention authority. Establish a multi-agency process safety regulatory program for all California oil refineries to improve the public accountability, transparency, and performance of chemical accident prevention and mechanical integrity programs.

The U.S. Environmental Protection Agency Jointly plan and conduct inspections with Cal/OSHA [California Division of Occupational Safety and Health], California EPA and other state and local regulatory agencies with chemical accident prevention responsibilities to monitor the effective implementation of the damage mechanism hazard review process.

The Board of Supervisors, Contra Costa County, California; The Mayor and City Council, City of Richmond, California; The California Air Quality Management Divisions; The U.S. Environmental Protection Agency; and The California Environmental Protection Agency Participate in the joint regulatory program to monitor the effective implementation of the damage mechanism hazard review process with Cal/OSHA and the U.S. Environmental Protection Agency.

Chevron Richmond Refinery Investigation Report January 2015 4 U.S. CHEMICAL SAFETY AND HAZARD INVESTIGATION BOARD

  1. 3 Chevron Regulatory Report

The CSB released its second finalized investigation report on the August 6, 2012, Chevron incident in October 2014 (the “Chevron Regulatory Report”). The report examines California process safety regulatory gaps and enforcement issues which contributed to the August 6th incident. The Chevron Regulatory Report also evaluates whether a rigorous goal-setting regulatory approach requiring employers to demonstrate that they have driven major accident risk to as low as reasonably practicable (ALARP) could be a more effective, prevention-focused regulatory system to reduce major accidents in California petroleum refineries. The Chevron Regulatory Report made the following recommendations:

California State Legislature, Governor of California Enhance and restructure California’s process safety management (PSM) regulations for petroleum refineries by including the goal-setting attributes identified in this report for petroleum refineries in the state of California.

Mayor and City Council, City of Richmond, California Implement or cause to be implemented a compensation system to ensure regulator capability in process safety oversight and policy development in Richmond, California.

Board of Supervisors Contra Costa County, California Implement a compensation system to ensure regulator capability in process safety oversight and policy development in Contra Costa County, California.

Chevron Richmond Refinery Investigation Report January 2015 5 U.S. CHEMICAL SAFETY AND HAZARD INVESTIGATION BOARD

  1. 4 Chevron Final Investigation Report

The following Chevron Final Investigation Report addresses additional investigation findings not covered in the two previous reports, including analysis of (1) the Chevron organization, emergency response, and safety culture; (2) industry leak response standards; and (3) mechanical integrity industry standards. This report supplements the information already published in the Interim Report and Regulatory Report. This is the third and final report the CSB is publishing on this incident. 1.4.1 Technical Findings This report highlights the following technical findings. (An in-depth discussion appears in the Chevron Interim Report.)

  1. The rupture of the 4-sidecut piping resulted from the 52-inch component being extremely thin due

to a damage mechanism11 known as sulfidation corrosion. Sulfidation corrosion, also known as sulfidic corrosion,12 is a damage mechanism that causes thinning in iron-containing materials, such as steel, due to the reaction between sulfur compounds and iron at temperatures ranging from 450°F to 1,000°F.13 This damage mechanism causes pipe walls to gradually thin over time. (See Section 4.1.)

  1. Sulfidation corrosion is common in crude oil distillation,14 where naturally occurring sulfur and

sulfur compounds found in crude oil feed, such as hydrogen sulfide,15 react with steel piping and equipment. Process variables that affect corrosion rates include the total sulfur content of the oil, the sulfur species present, the flow conditions, and the system temperature. Virtually all crude oil feeds contain sulfur compounds; as a result, sulfidation corrosion is a damage mechanism present at every refinery that processes crude oil. Sulfidation corrosion can cause thinning to the point of pipe failure when not properly monitored and controlled. (See Section 4.1.)

  1. The Chevron Richmond Refinery 4-sidecut piping was constructed of carbon steel, which

corrodes at a much faster rate from sulfidation than other typical alternative materials of construction, such as higher chromium-containing steels. In addition to its inherently faster rate of sulfidation corrosion when compared with higher chromium steels, carbon steel also experiences significant variation in corrosion rates due to possible variances in silicon content, a component used in the steel manufacturing process. Carbon steel piping containing silicon

11 Piping damage mechanisms are any type of deterioration encountered in the refining and chemical process industry that can result in flaws/defects that can affect the integrity of piping (e.g., corrosion, cracking, erosion, dents, and other mechanical, physical or chemical impacts). See API 570: Piping Inspection Code: In-Service Inspection, Rating, Repair, and Alteration of Piping Systems. 3rd ed., Section 3.1.1.5, November 2009. 12 API RP 939-C: Guidelines for Avoiding Sulfidation (Sulfidic) Corrosion Failures in Oil Refineries. 1st ed., Section 3.1.6, May 2009. 13 Ibid., Section 1. 14 Distillation separates mixtures into broad categories of its components by heating the mixture in a distillation column where different products boil off and are recovered at different temperatures. See http://www.eia.gov/todayinenergy/detail.cfm?id=6970 (accessed April 4, 2013). 15 Hydrogen sulfide is the most aggressive sulfur compound that causes sulfidation corrosion.

Chevron Richmond Refinery Investigation Report January 2015 6 U.S. CHEMICAL SAFETY AND HAZARD INVESTIGATION BOARD

content less than 0.10 weight percent can corrode at accelerated rates,16 up to 16 times faster than carbon steel piping containing higher percentages of silicon. (See Section 4.1.)

  1. Carbon steel piping components in refineries throughout the U.S. are susceptible to highly

variable sulfidation corrosion rates. Carbon steel piping is manufactured to meet certain specifications, including American Society for Testing and Materials (ASTM) A53B,17 ASTM A106,18 and American Petroleum Institute (API) 5L.19 ASTM A53B and API 5L do not contain minimum silicon content requirements for carbon steel piping,20 while ASTM A106 requires the piping to be manufactured with a minimum silicon content of 0.10 weight percent. As a result, manufacturers have used different levels of silicon in the carbon steel pipe manufacturing process. Thus, sulfidation corrosion rates could vary depending on the manufacturing specification for silicon content in the carbon steel installed in refinery processes. In the mid- 1980s, pipe manufacturers began to simultaneously comply with all three specifications, so most carbon steel piping purchased since then for refinery operations likely has a minimum of 0.10 weight percent silicon content. However, over 95 percent of the 144 refineries in the U.S., including the Chevron Richmond Refinery, were built before 1985. Therefore, the original carbon steel piping components in these refineries likely contain varying percentages of silicon, so they may experience highly variable sulfidation corrosion rates. (See Section 4.1.)

  1. The Chevron Richmond Refinery 4-sidecut piping circuit containing the 52-inch component that

failed was constructed of ASTM A53B carbon steel, which had no minimum specification for silicon content. Post-incident testing of samples of the 4-sidecut piping from the Chevron Richmond Refinery identified silicon content ranging from 0.01 weight percent to 0.2 weight percent. Of 12 samples taken from the 8-inch and the adjacent 12-inch 4-sidecut line, six had a silicon concentration of less than 0.10 weight percent. The 52-inch pipe component that ruptured on the day of the incident had a silicon content of only 0.01 weight percent. The elbow component directly upstream of the 52-inch component that failed had a silicon concentration of 0.16 weight percent, showing considerably less thinning. (See Section 4.1.)

  1. Determining silicon content in existing carbon steel piping and equipment in the field is a

difficult undertaking. Every component must be inspected to properly characterize the silicon content in each component of a piping circuit. This is known as 100 percent component inspection. Two techniques are used to inspect a component in an existing carbon steel piping circuit with unknown chemical composition for low silicon content and resulting variable corrosion rates: (1) performing laboratory-based chemical analysis of the carbon steel (a “destructive test,” meaning it requires removal of a sample of the steel), or (2) performing pipe

16 API RP 939-C: Guidelines for Avoiding Sulfidation (Sulfidic) Corrosion Failures in Oil Refineries. 1st ed., Section 6.2.3.2, May 2009. 17 ASTM Standard A53/A53M-12: Standard Specification for Pipe, Steel, Black and Hot-Dipped, Zinc-Coated, Welded and Seamless. 2012. 18 ASTM Standard A106/A106M–1:Standard Specification for Seamless Carbon Steel Pipe for High-Temperature Service. 2011. 19 API Specification 5L: Specification for Line Pipe. 45th ed., December 2012.

  1. ASTM Standard A53/A53M-12: Standard Specification for Pipe, Steel, Black and Hot-Dipped, Zinc-Coated,

Welded and Seamless. 2012.

Chevron Richmond Refinery Investigation Report January 2015 7 U.S. CHEMICAL SAFETY AND HAZARD INVESTIGATION BOARD

wall thickness measurements. Measuring pipe wall thickness of every component is useful as a means to ascertain silicon content only if the piping circuit has been exposed to sulfidation corrosion for a long enough time period so that variances in corrosion rate caused by differences in silicon content may be detected. Steel alloys containing at least 9 weight percent chromium are more resistant to sulfidation corrosion than carbon steel and do not present the hazard of extreme variations in corrosion rates in components within the same piping circuit due to slight differences in chemical composition.21 Thus, alloys with higher chromium content are an inherently safer choice in high-temperature sulfidation corrosion environments.22 (See Section 4.2 and Section 4.4.)

  1. Effectively implementing inherently safer design provides an opportunity for preventing major

chemical incidents. The August 6, 2012, incident at Chevron and other incidents23 throughout the refining industry highlight the difficulty in preventing failure caused by sulfidation corrosion in low-silicon carbon steel piping solely through inspection, a procedural safeguard that is low on the hierarchy of controls. Using inherently safer design concepts to eliminate the hazard of variation in corrosion rate in carbon steel piping due to hard-to-determine silicon content will prevent future similar failures in refineries. (See Section 4.4.) 1.4.2 Organizational Findings

  1. Chevron did not effectively implement internal recommendations to help prevent pipe failures

due to sulfidation corrosion. In the 10 years prior to the incident, a small number of Chevron personnel with knowledge and understanding of sulfidation corrosion recommended on several occasions either a one-time inspection of every component within the 4-sidecut piping circuit— known as 100 percent component inspection—or an upgrade of the material of construction of the 4-sidecut piping. The recommendations were not implemented effectively, and the 52-inch component remained in service until it failed on August 6, 2012. (See Section 5.1.)

  1. Chevron failed to perform internally recommended 100 percent component inspections. An

independent corporate entity within Chevron, the Chevron Energy Technology Company (ETC), provides technology solutions and technical expertise for Chevron operations worldwide. Chevron ETC metallurgists released within Chevron a formal report dated September 30, 2009 (nearly 3 years before the incident), titled Updated Inspection Strategies for Preventing Sulfidation Corrosion Failures in Chevron Refineries (ETC Sulfidation Failure Prevention Initiative). The initiative specifically recommends that inspectors perform 100 percent component inspection on high-temperature carbon steel piping susceptible to sulfidation corrosion. The initiative defines a priority ranking system to help focus the inspection

21 The protective scale, FeCr2S4, begins to be the dominant scale formed in steels containing a chromium content of five weight percent. The 5Cr steel alloy can be manufactured to contain anywhere from 4 percent to 6 percent chromium. Thus, “the sulfidation corrosion rate can vary dramatically in 5Cr steels even in the same operating environment.” See Niccolls, E. H., J. M. Stankiewicz, J. E. McLaughlin, and K. Yamamoto. "High Temperature Sulfidation Corrosion in Refining." 17th International Corrosion Congress. Las Vegas: NACE International, 2008. 22 Steels with higher chromium content are inherently safer than carbon steel with respect to sulfidation corrosion. However, analysis is still required to ensure that the best material of construction is selected. 23 API RP 939-C: Guidelines for Avoiding Sulfidation (Sulfidic) Corrosion Failures in Oil Refineries. 1st ed., May 2009.

Chevron Richmond Refinery Investigation Report January 2015 8 U.S. CHEMICAL SAFETY AND HAZARD INVESTIGATION BOARD

implementation efforts. The process conditions of the 4-sidecut stream placed it in the highest priority for 100 percent component inspection. However, the 4-sidecut piping was not 100 percent component inspected prior to the August 2012 incident. (See Section 5.1.1.)

  1. The CSB found that the Richmond refinery’s turnaround planning group rejected the

recommendations to 100 percent component inspect or replace the portion of the 4-sidecut piping that ultimately failed24. The turnaround work scope and approval process is guided by predetermined criteria in what Chevron calls a “Framing Document.” Turnaround work requests are approved or denied by the turnaround planning group based on the document criteria. The Framing Document sets the criteria for work items that can be automatically accepted as turnaround work items during the planned turnaround. Less urgent items and those that may be performed on the run (while the unit is operating) or during the next turnaround are not included by default in the turnaround work scope. Inspection data for the 4-sidecut piping, where measurements were historically taken on high-silicon fittings,25 indicated the 4-sidecut piping could safely operate through 2016. Therefore, recommendations to replace the 8-inch 4-sidecut piping during the 2007 and 2011 turnarounds were denied in accordance with the Framing Document criteria. The Sulfidation Failure Prevention Initiative developed by the ETC metallurgist experts was not considered a valid mandate for justifying turnaround work which otherwise fell outside the acceptance criteria of the Framing Document. (See Section 5.1.2.)

  1. A Crude Unit metallurgical analysis recommendation to perform 100 percent volumetric

inspection26 of the 4-sidecut line submitted for the 2007 turnaround was approved by the Crude Unit’s Area Business Unit (ABU) Manager. Chevron installed experimental “Guided Wave bracelets”27 which were designed to continuously perform 100 percent volumetric inspection. However, the guided wave bracelets were only installed on a small portion of the 4-sidecut line which did not include the 52-inch component that ultimately failed. In addition, when the Guided Wave bracelets were found to be unreliable, manual 100 percent component inspection was not conducted in its place. (See Section 5.1.2.1.1.)

  1. If a submitted turnaround work item recommendation was not accepted under the Chevron

Richmond Refinery turnaround Framing Document—for example, an “Industry Best Practice” that Chevron may not interpret as being supported by hard data needed to justify the work, or a profit-improvement project—there was an informal appeal process. A case for approval for the work had to be made to the ABU Manager for the unit where the turnaround was to occur. However, this approach was never attempted by Chevron inspection or metallurgical staff who submitted the recommendations to replace the 4-sidecut piping. In addition, no high-level manager was assigned responsibility to ensure that the ETC Sulfidation Failure Prevention Initiative or other ETC sulfidation recommendations were included in the turnaround scope, so all responsibility to implement the ETC recommendations was placed on lower-level employees, who did not have decision-making or funding authority. (See Section 5.1.2.3.)

24 Other portions of the 4-sidecut were replaced in 2007 and 2011. 25 A 2011 effort added an additional 12 CML locations on straight-run piping components. A CML was not placed, however, on the low-silicon 52-inch component that failed on August 6, 2012. 26 Common volumetric inspection techniques include ultrasonic and radiography testing. 27 Guided Wave bracelets are continuous monitoring probes that can, if proven reliable, remove the need for manual inspection of piping.

Chevron Richmond Refinery Investigation Report January 2015 9 U.S. CHEMICAL SAFETY AND HAZARD INVESTIGATION BOARD

including Unit Reliability Briefs (URBs) and Reliability Steering Committee meetings, to steward mechanical reliability at its various refineries. Employees meeting within the various URIP programs discussed the ETC Sulfidation Failure Prevention Initiative. However, the metallurgical and inspection staff assigned by the URB and Reliability Steering Committee to implement the ETC Sulfidation Failure Prevention Initiative routed all recommendations through the turnaround planning process. The turnaround planning group denied these recommendations because they did not meet turnaround Framing Document requirements. In addition, no high- level refinery managers who attended URBs and Reliability Steering Committee meetings took or were assigned responsibility for the ETC Sulfidation Failure Prevention Initiative and ETC sulfidation mitigation recommendations to assure their effective implementation within the Richmond refinery. (See Section 5.1.3.)

not effectively gain the necessary commitment from refinery management to implement the ETC Sulfidation Failure Prevention Initiative or other ETC recommendations to upgrade susceptible carbon steel piping to inherently safer, higher chromium steel. The FER BIN is intended to be a “best practice” network across all Chevron refineries for bringing up-to-date changes in industry standards and best practices into the organization. The FER BIN is headed by a technically qualified subject-matter expert, the FER BIN Leader. The individual who was in the FER BIN Leader role when the ETC Sulfidation Failure Prevention Initiative was issued retired in September 2010, before the initiative was fully developed and implemented at the Richmond refinery. A replacement for the FER BIN Leader was not assigned until four months after the previous FER BIN Leader’s retirement—in January 2011. The onboarding process for the new FER BIN Leader’s roles and responsibilities took additional time because of the hiring delay. When the new FER BIN Leader visited the Chevron Richmond Refinery in early 2012, he identified that the refinery was not successfully implementing the ETC Sulfidation Failure Prevention Initiative. However, he met only with inspection and reliability personnel—not with refinery management who had the authority to implement his recommendations to adhere to the ETC Sulfidation Failure Prevention Initiative guidance. (See Section 5.1.4.)

thinned piping. Chevron determines the date for replacing thinned piping by using a piping “Minimum Alert Thickness” and a piping “Minimum Required Thickness” (Figure 1).28 When piping reaches its Minimum Alert Thickness, an engineering evaluation is triggered to calculate the piping’s Minimum Required Thickness, or the lowest thickness that can withstand the pressure and structural stresses of the piping circuit, to determine whether the piping must be replaced immediately or if replacement can be safely delayed. This evaluation may result in the lowering of the Minimum Alert Thickness to 0.1-inch. Evaluation of the inspection thickness data obtained on the 4-sidecut piping during the 2011 turnaround indicated that the 4-sidecut piping would thin below its 0.14-inch Minimum Alert Thickness before the next turnaround scheduled for 2016. A minimum structural thickness value of 0.036-inch had been calculated for 28 Chevron’s term for “Minimum Alert Thickness” is “Flag Thickness,” and its term for “Minimum Required Thickness” is “T-min.”

Chevron Richmond Refinery Investigation Report January 2015 10 U.S. CHEMICAL SAFETY AND HAZARD INVESTIGATION BOARD

a small piping component within the 4-sidecut piping earlier during the turnaround. This 0.036- inch value was applied to the full length of the 8-inch 4-sidecut piping circuit. This calculation was used as a technical justification to reduce the 8-inch 4-sidecut Minimum Alert Thickness to 0.1-inch, and the piping wall thickness was predicted to stay above this Minimum Alert Thickness until after the next turnaround. The 4-sidecut line was therefore allowed to continue operating with replacement scheduled for the next turnaround in 2016. API RP 574: Inspection Practices for Piping System Components provides users with a default minimum structural thickness of 0.11-inch for piping with a diameter of 8-inches—which can be used as the Minimum Required Thickness for piping in lieu of detailed engineering calculations.29 Chevron performed a detailed calculation to determine the 4-sidecut Minimum Required Thickness and the API RP 574 default minimum structural thickness was not used. However, had Chevron used the API RP 574 default minimum structural thickness value of 0.11-inch as the 4-sidecut Minimum Required Thickness, the remaining life of the piping circuit would have been predicted to be less than ten years, and a turnaround planning group discussion should have been triggered to discuss replacement options for the 8-inch 4-sidecut piping. Such a discussion could have resulted in the decision to replace the 8-inch 4-sidecut piping during the 2011 turnaround, and the August 6, 2012, pipe rupture could have been prevented. In addition, Chevron does not require a formal multi-person review process to be performed to verify that available inspection data is reliable considering the relevant piping circuit damage mechanisms prior to changing the minimum thickness values used to project the remaining life of a piping circuit. (See Section 5.1.5.)

29 This minimum thickness is specified for piping between 6 and 18 inches in diameter that operates at temperatures under 400 ⁰F. The 4-sidecut piping operated at a higher temperature, likely requiring a greater minimum thickness.

Chevron Richmond Refinery Investigation Report January 2015 11 U.S. CHEMICAL SAFETY AND HAZARD INVESTIGATION BOARD

Figure 1. To-scale schematic of 4-sidecut piping identifying key wall thickness values. These include the original wall thickness (0.322-inch), “Minimum Alert Thickness” (0.13-inch), and “Minimum Required Thickness” (0.11-inch) using API RP 574 default values.

  1. Inspection data obtained during the 2011 Crude Unit turnaround identified that components of the

12-inch portion of the 4-sidecut piping had become so thin due to sulfidation corrosion that much of it had to be replaced during the turnaround. Even though the 12-inch 4-sidecut piping was manufactured from the same specification of carbon steel, contained the same process fluid, and experienced similar process conditions30 as the 8-inch 4-sidecut piping, Chevron turnaround management did not consider that components in the 8-inch 4-sidecut piping could also be too thin to allow the piping to continue in operation. Chevron personnel involved with the decision to replace portions of the 12-inch 4-sidecut piping concluded, based upon available inspection data, that all of the 8-inch 4-sidecut piping that had not been inspected, including the 52-inch component that ultimately failed, was acceptable for continued operation. (See Section 5.1.2.2.1.)

  1. Chevron does not effectively use its online dashboard, Operational Excellence and Reliability

Intelligence (OERI), which tracks 26 different process safety indicators, to track the implementation status of ETC recommendations and new industry guidance. OERI visually displays the status of many different process safety indicators. Management reviews these

30 The CSB notes that the process conditions of the 8-inch and 12-inch 4-sidecut piping were not identical.

Chevron Richmond Refinery Investigation Report January 2015 12 U.S. CHEMICAL SAFETY AND HAZARD INVESTIGATION BOARD

metrics weekly and schedules monthly meetings to discuss the items that need attention. The Chevron Richmond Refinery leadership team is held accountable for the status of these metrics. The Refinery manager and the president of global manufacturing meet regularly with members of the Chevron Richmond Refinery leadership team to discuss status of the metrics they oversee, and they incorporate into all leadership team members’ performance reviews their effectiveness in managing these metrics. Chevron does not track in OERI the implementation status of ETC recommendations or new industry guidance. Such an indicator could have ensured that the status of the ETC Sulfidation Failure Prevention Initiative at the Chevron Richmond Refinery received greater management attention. (See Section 5.1.6.) 1.4.3 Emergency Response Findings

  1. Chevron did not effectively identify in the Incident Command structure the damage mechanisms

that could have caused the 4-sidecut piping leak on the day of the incident. The OSHA Hazardous Waste Operations and Emergency Response (HAZWOPER) standard states that the Incident Commander “shall identify, to the extent possible, all hazardous substances or conditions present”31 in an emergency response situation. However, the appropriate technical expertise necessary to identify the potential for low-silicon, more rapidly corroding piping components in the 4-sidecut piping was not effectively consulted in the Incident Command structure on August 6, 2012. This lack of knowledge of all potential causes of the 4-sidecut piping leak led the Incident Commander to direct emergency responders to take actions that may have ultimately exacerbated the leak and put many Chevron personnel in harm’s way. It also led the Incident Commander to limit the “hot zone” to a small area that did not consider the possibility of pipe rupture. When the 4-sidecut piping ruptured, personnel and firefighting equipment positioned in the “cold zone” were engulfed in the large vapor cloud. (See Section 5.3.)

  1. Process conditions were not effectively identified and communicated in the Incident Command

structure on the day of the incident. The 4-sidecut leak response and mitigation strategy developed following an assessment of the leaking pipe by Chevron Fire Department leaders and other key Chevron operations personnel involved stripping insulation from the hot piping to identify the leak location. The CSB found that several Chevron Fire Department personnel responding to the leaking 4-sidecut pipe were not properly informed of the operating temperature of the line. CSB interviews identified that some firefighters believed the line was operating at a temperature of about 130°F rather than the actual temperature approaching 640°F. CSB interviews indicate that, had the responders been aware of the actual operating temperature, some likely would have raised concerns to their supervisors about the safety of performing aggressive leak response actions on a hot pipe. (See Section 5.3.2.)

  1. Chevron did not recognize or accommodate the shortcomings of reliance on Stop Work Authority

in averting major process hazards. The CSB learned that some personnel participating in the insulation removal process while the 4-sidecut line was leaking were uncomfortable with the safety of this activity because of potential exposure to the flammable process fluid. Some individuals even recommended that the Crude Unit be shut down, but they left the final decision

31 29 CFR §1910.120(q)(3)(ii) (2012).

Chevron Richmond Refinery Investigation Report January 2015 13 U.S. CHEMICAL SAFETY AND HAZARD INVESTIGATION BOARD

to the management personnel present. No one formally invoked their Stop Work Authority.32 In addition, Chevron safety culture surveys indicate that between 2008 and 2010, personnel had become less willing to use their Stop Work Authority. Regardless of how a Stop Work program is portrayed, there are a number of reasons why such a program may fail related to the ‘human factors’ issue of decision-making; these reasons include belief that the Stop Work decision should be made by someone else higher in the organizational hierarchy, reluctance to speak up and delay work progress, and fear of reprisal for stopping the job.33 (See Section 5.1.7 and Section 5.5.2.1.)

  1. On the day of the incident, Chevron had no leak response guidance or formal protocol for

operations personnel, refinery management, emergency responders, or the Incident Commander to refer to when determining how to handle a process leak. Without a protocol, Chevron had no formal system to ensure the right people were gathering all important information before deciding on leak mitigation strategies. Such an evaluation could have led to the conclusion that the cause of the leak was general thinning due to sulfidation corrosion, and clamping the pipe—a mitigation strategy being considered—was not a viable solution because the pipe likely did not have the structural integrity to support a clamp. This realization likely would have resulted in deciding to immediately shut down the unit. Following this incident, Chevron improved its internal policies by developing and implementing a leak response protocol for determining how to assess and mitigate leaks within the refinery.34 The new leak response protocol would require unit shutdown if a similar leak were to occur in a Chevron refinery. (See Section 5.3.4.) 1.4.4 Safety Culture Findings

  1. The CSB identified several contributing causes of the August 6, 2012, incident relating to the

Chevron Richmond Refinery’s safety culture: a. Decision making that encourages continued operation of a unit despite hazardous leaks. Examples include another leak incident in the Chevron Richmond Refinery in 2010, which was allowed to continue in operation, releasing high-temperature, flammable process fluid in an active unit, as well as continued efforts on August 6, 2012, to perform on-stream mitigation attempts despite high-temperature hydrocarbon vapor release and the occurrence of a flash fire; b. Reluctance among employees to use their Stop Work Authority. Recent safety culture surveys performed at the refinery indicate that employees had become less willing to use their Stop Work Authority between 2008 and 2010; and

32 Chevron defines “Stop Work Authority” as the “… responsibility and authority of any individual to stop work when an unsafe condition or act could result in an undesirable terms.” See http://upstream.chevron.com/contractorgom/forms_policies/stop_work_authority.aspx (accessed November 5, 2014). 33 A 2010 study by The RAD Group of 2,600 workers (primarily oil and gas service employees) found that the surveyed employees directly intervene in only 39% of the unsafe acts that they observe on the job. The study concluded people did not stop unsafe work were primarily because (1) they worry the person who is performing the unsafe work will become angry or defensive, and (2) they do not believe they can effectively stop unsafe work. See Ragain, R., Ragain, P., Allen, M. & Allen, M. “Study: Employees Intervene in Only 2 of 5 Observed Unsafe Acts.” Drilling Contractor. January / February 2011. 34 The entire Chevron leak response protocol is presented in Appendix A.

Chevron Richmond Refinery Investigation Report January 2015 14 U.S. CHEMICAL SAFETY AND HAZARD INVESTIGATION BOARD

c. Substandard equipment maintenance practices. Those same surveys indicate that Chevron Richmond Refinery employees saw increased problems in how the refinery maintained its equipment between 2008 and 2010. (See Section 5.5.)  1.4.5 Industry Codes and Standards Findings

  1. Industry falls short of requiring comprehensive inspection or effective facility upgrades.

American Petroleum Institute (API) Recommended Practice (RP) 939-C: Guidelines for Avoiding Sulfidation (Sulfidic) Corrosion Failures in Oil Refineries is the primary industry guidance document on ways to monitor and control sulfidation corrosion. It states that carbon steel piping can contain components with low silicon concentrations, and these components can corrode at a faster rate than adjacent piping components. However, API RP 939-C does not specifically require users to perform 100 percent component inspection or recommend that facilities upgrade high-risk carbon steel piping circuits to steel alloys that are more resistant to sulfidation corrosion. (See Section 5.2.1.)

  1. Industry guidance is inconsistent in the information presented about carbon steel piping

susceptible to sulfidation corrosion. API has published various codes and recommended practices in addition to API RP 939-C that discuss sulfidation corrosion, including API RP 571: Damage Mechanisms Affecting Fixed Equipment in the Refining Industry, API 570: Piping Inspection Code: In-Service Inspection, Rating, Repair, and Alteration of Piping Systems, API RP 578: Material Verification Program for New and Existing Alloy Piping Systems, and API RP 574: Inspection Practices for Piping System Components. While these documents provide some information on sulfidation corrosion, the information and guidance is varied and inconsistent. (See Sections 5.2.2, 5.2.3, 5.2.4, and 5.2.5.)

  1. Industry guidance for responding to process leak incidents can be improved. API and the

American Society of Mechanical Engineers (ASME) have published several codes, standards, and recommended practices that provide information on how to safely control, mitigate, or respond to hazardous process fluid leaks. However, the guidance is inconsistent, and none of the documents provide overall, comprehensive guidance to emergency responders, operations personnel, and facility management to respond safely to hazardous process leak incidents. (See Section 5.4.) 1.4.6 Regulatory Findings

  1. In the years leading to the August 6, 2012, incident, the Chevron Richmond Refinery identified

weaknesses in its Stop Work Authority program due to employee hesitation to use Stop Work Authority when witnessing an unsafe act. The Refinery also identified a decline in employee perception of its mechanical integrity programs. However, the regulator did not require the Chevron Richmond Refinery to take quality, constructive steps to improve these areas. Had steps been taken before the incident to encourage employees to use their Stop Work Authority or to determine why the refinery’s mechanical integrity programs were seen as deficient, the August 6, 2012, pipe rupture might have been prevented. (See Section 5.5.2.4.)

Chevron Richmond Refinery Investigation Report January 2015 15 U.S. CHEMICAL SAFETY AND HAZARD INVESTIGATION BOARD

  1. 5 Recommendations

As a result of the findings and conclusions of this report, the CSB makes recommendations, summarized below, to the following recipients (see Section 6.0 for full language of the recommendations):

American Petroleum Institute Revise API RP 939-C: Guidelines for Avoiding Sulfidation (Sulfidic) Corrosion Failures in Oil Refineries to establish minimum requirements for preventing catastrophic rupture of low-silicon carbon steel piping. Revise API RP 571: Damage Mechanisms Affecting Fixed Equipment in the Refining Industry to increase awareness of sulfidation corrosion characteristics and refer users to specific API standards that provide important information to prevent catastrophic rupture of low-silicon carbon steel piping. Revise API 570: Piping Inspection Code: In-service Inspection, Rating, Repair, and Alteration of Piping Systems to incorporate language consistent with API RP 939-C: Guidelines for Avoiding Sulfidation (Sulfidic) Corrosion Failures in Oil Refineries, increase awareness of sulfidation corrosion characteristics, provide additional information to prevent catastrophic rupture of low-silicon carbon steel piping, and require users to follow the proposed new leak response guidance in API RP 2001: Fire Protection in Refineries. Revise API RP 578: Material Verification Program for New and Existing Alloy Piping Systems, to require users to establish and implement a program to identify carbon steel piping circuits that are susceptible to sulfidation corrosion and may contain low-silicon components. Revise API RP 574: Inspection Practices for Piping System Components (3rd edition) to incorporate as a normative reference API RP 939-C: Guidelines for Avoiding Sulfidation (Sulfidic) Corrosion Failures in Oil Refineries and to follow the leak response protocol requirements established in API RP 2001: Fire Protection in Refineries. Revise API RP 2001: Fire Protection in Refineries to require users to develop a process fluid leak response protocol specific to their own facility that must be followed when a process fluid leak is discovered. Recommend users to incorporate key actions into their leak response protocol to effectively manage response to potential sulfidation corrosion piping failure.

American Society of Mechanical Engineers Refer users to follow the leak response guidance developed by the American Petroleum Institute prior to conducting leak repairs.

Chevron U.S.A. Develop an accountability method at Chevron to identify and track effective implementation of Chevron or industry best practices to ensure process safety or employee personal safety.

Chevron Richmond Refinery Investigation Report January 2015 16 U.S. CHEMICAL SAFETY AND HAZARD INVESTIGATION BOARD

Develop an auditable process for all recommended turnaround work items related to inspection or mechanical integrity recommendations that are denied or deferred. This process shall provide the submitter of the denied or deferred recommendation with a mechanism to further elevate and discuss the recommendation with higher level management. Develop an approval process that includes a technical review that must be implemented prior to resetting the minimum alert thickness to a lower value in the inspection database.

Board of Supervisors, Contra Costa County, California and Mayor and City Council, City of Richmond, California Revise the Industrial Safety Ordinance (ISO) regulations for petroleum refineries to require the development of an oversight committee comprised of the regulator, the company, the workforce and their representatives, and community representatives. Among the duties of this committee shall be to oversee the development and implementation of action items created as a result of safety culture assessment findings.

Chevron Richmond Refinery Investigation Report January 2015 17 U.S. CHEMICAL SAFETY AND HAZARD INVESTIGATION BOARD

  1. 0 Richmond Refinery Process Description
  2. 1 Chevron Background

Chevron was originally founded as the Pacific Coast Oil Company in 1879.35 In 1906, Pacific Coast Oil Company merged with Iowa Standard to form a new company known as Standard Oil Company of California.36 The company then acquired Gulf Oil Corporation in 1984 and changed its name to Chevron.37 Headquartered in San Ramon, California, Chevron Corporation is the third-largest American company by revenue.38 Globally, Chevron employs over 60,000 people.39 Chevron includes petroleum operations, chemicals operations, mining operations, power generation, and energy services.40 It operates seven petroleum refineries, five of which are in the United States. The five U.S. refineries process a combined crude oil capacity of approximately one million barrels per day (bpd).41 2.2 Richmond Refinery Chevron’s Richmond Refinery is located in Richmond, California, approximately 25 miles northeast of San Francisco in Contra Costa County. The original refinery units were built in 1902 by Pacific Coast Oil Company. The Richmond refinery covers approximately 2,900 acres of the San Pablo Peninsula (Figure 2) and processes 250,000 barrels of crude oil per day. Approximately 1,200 people are employed at the refinery.

35 http://www.chevron.com/about/history/ Chevron Company History Page (accessed June 5, 2014). 36 http://www.chevron.com/about/history/1876/ (accessed June 30, 2014).

37 http://www.chevron.com/about/leadership/ (accessed June 30, 2014). 38 http://money.cnn.com/magazines/fortune/fortune500/2012/full_list/. This ranking is by annual revenue (accessed June 30, 2014). 39 http://www.chevron.com/about/leadership/ (accessed June 30, 2014). 40 http://www.forbes.com/companies/chevron/ (accessed June 30, 2014). 41 See http://www.chevron.com/documents/pdf/UnitedStatesFactSheet.pdf (accessed December 18, 2014).

Chevron Richmond Refinery Investigation Report January 2015 18 U.S. CHEMICAL SAFETY AND HAZARD INVESTIGATION BOARD

Figure 2. Aerial view of the Chevron Richmond Refinery. 2.3 #4 Crude Unit The Richmond, California Chevron Refinery’s #4 Crude Unit (Crude Unit) performs the initial processing step in the refining process. Raw crude oil stored in storage tanks is pumped to the Crude Unit. After an initial “cleaning” of the oil through the use of a desalter, which removes corrosive salts, solids, and water,42 the oil is pre-heated and enters the C-1100 Crude Unit Atmospheric Column (Crude Column) at approximately 675 degrees Fahrenheit (°F). The Crude Column separates through distillation various hydrocarbon component mixtures in the crude feed, creating multiple streams coming off the column with differing boiling points. These streams include an overhead light hydrocarbon stream, jet oil streams, a

42 Removing chloride salts and water prevents the formation of hydrochloric acid, which can severely corrode downstream equipment. Other salts and solids are removed to prevent fouling within equipment such as heat exchangers, which can significantly reduce heat transfer.

Chevron Richmond Refinery Investigation Report January 2015 19 U.S. CHEMICAL SAFETY AND HAZARD INVESTIGATION BOARD

diesel stream, a light gas oil stream, and a bottoms stream composed of heavy liquid hydrocarbons. Each stream is further refined and processed in subsequent units within the refinery. 2.4 4-Sidecut Line The August 6, 2012, incident occurred from the piping referred to as the “4-sidecut” line, one of several process streams exiting the Crude Column (Figure 3).43 As shown in Figure 4, light gas oil, the Crude Unit 4-sidecut process fluid, exits the atmospheric column via a 20-inch nozzle and is split into a 12-inch line and an 8-inch line. The pipe rupture (Figure 5) occurred on a 52-inch long component44 of the 4- sidecut 8-inch line (the 52-inch component). The line operated at a temperature near 640°F45,46 and had an operating pressure of approximately 55 pounds per square inch gauge (psig) at the rupture location. At the time of the incident, light gas oil was flowing through the 8-inch line at a rate of approximately 10,800 bpd.47

43 The atmospheric column separates crude oil feed into different streams through distillation. These streams are further processed in other units in the refinery. 44 The term “component” refers to a portion of piping between welds or flanges. It includes straight run piping and pipe fittings. 45 The autoignition temperature for this process, the temperature at which a material will combust in the presence of sufficient oxygen without an ignition source, was 640°F. This number is based on the Chevron Light Gas Oil Material Safety Data Sheet. Chemical testing of 4-sidecut samples following the incident indicated lower autoignition temperatures; however, these samples may not have been representative of typical 4-sidecut process fluid. 46 Chevron instrumentation indicates that the process fluid entered the 4-sidecut piping at a temperature near 640°F and cooled to 625°F before reaching the piping circuit pumps downstream of the rupture location. 47 This rate is the equivalent of 315 gallons per minute (gpm). A barrel equals 42 gallons.

Chevron Richmond Refinery Investigation Report January 2015 20 U.S. CHEMICAL SAFETY AND HAZARD INVESTIGATION BOARD

Figure 3. Schematic of C-1100 Crude Unit atmospheric column and upstream process equipment.

Chevron Richmond Refinery Investigation Report January 2015 21 U.S. CHEMICAL SAFETY AND HAZARD INVESTIGATION BOARD

Figure 4. 4-sidecut line configuration and rupture location.

Chevron Richmond Refinery Investigation Report January 2015 22 U.S. CHEMICAL SAFETY AND HAZARD INVESTIGATION BOARD

Figure 5. Photo of rupture on 4-sidecut 52-inch component. 3.0 The Incident 3.1 Leak Discovery At approximately 3:50 p.m. on August 6, 2012, an outside operator performing routine checks of piping and equipment found an 18-inch puddle of what appeared to be a diesel-like material on the refinery concrete pad (Figure 6). Identifying that the leak was occurring from overhead, the operator observed intermittent drips as they accumulated on the underside of an insulated pipe 14 feet above ground level. The leaking pipe was identified to be a portion of the 4-sidecut piping that originated on the Crude Column. Visually analyzing the piping, the operator determined that the line could not be isolated from the process.

Chevron Richmond Refinery Investigation Report January 2015 23 U.S. CHEMICAL SAFETY AND HAZARD INVESTIGATION BOARD

Figure 6. CSB animation depicting operator identifying the leaking 4-sidecut pipe. The operator’s supervisor arrived at the leak location, shortly followed by the shift team leader. These individuals observed that the leak was dripping at a rate of approximately 40 drips per minute. The piping was insulated, so the individuals gathered near the leak could not identify its precise source (Figure 7). They concluded that the leak was not significant enough to require a shutdown, but was still a serious situation. Shortly after 4:00 p.m., they called the Chevron Fire Department to the scene, a typical practice at the refinery when leaks are discovered. Firefighters began to arrive at approximately 4:07 p.m. and established an Incident Command structure. A hot zone of 20 feet by 20 feet was established and taped off around the leak location by the Incident Commander. The area outside of the hot zone was considered the cold zone, or safe zone.48

48 A decontamination corridor is often established in the warm zone, an area established between the hot zone and the cold zone. “Decontamination involves thorough washing to remove contaminants. It should be performed in an area upwind of the Hot Zone. An area that is uphill, with good drainage, and easily accessible for responders is preferred.” See http://chemm.nlm.nih.gov/decontamination.htm (accessed January 21, 2015).

Chevron Richmond Refinery Investigation Report January 2015 24 U.S. CHEMICAL SAFETY AND HAZARD INVESTIGATION BOARD

Figure 7. Photo taken of the leaking 4-sidecut pipe on August 6, 2012, at the Chevron Richmond Refinery.49 Insulation obscured the actual leak location. Stain signifies where hydrocarbon process fluid was leaking from the 4-sidecut piping.

49 Photo from http://richmond.chevron.com/Files/richmond/Investigation_Report.pdf (accessed June 27, 2014).

Chevron Richmond Refinery Investigation Report January 2015 25 U.S. CHEMICAL SAFETY AND HAZARD INVESTIGATION BOARD

Beginning at approximately 4:15 p.m., many additional personnel were called to the scene of the leak to assist in the leak analysis. Various operations personnel were called to the leak. Two Chevron inspectors reported to the leak location to provide information on inspection history of the 4-sidecut line. The lead Crude Unit process engineer also arrived at the leak location to determine an estimate of the hole size and the quantity of material leaking so that proper environmental release calculations could be performed. At approximately 5:00 p.m., the shift team leader left the scene of the leak and went to the control room. He directed the board operator to reduce the feed to the 4-sidecut line by 5,000 bpd.

Figure 8. Timeline of events on August 6, 2012. 3.2 Leak Response Ultimately, a large group of Chevron employees—40 people in total throughout the hours leading to the incident—accumulated at the leak location. They began discussing their options to mitigate or stop the leak. The inspectors informed the group that the 4-sidecut pipe walls were thinning due to sulfidation corrosion, but data collected as recently as two months prior indicated the 4-sidecut line had sufficient wall thickness to last until the next turnaround in 2016. This assessment led the group to believe that a localized mechanism, such as abrasion on the line from a pipe support near the dripping location, was the likely cause of the leak. The group then called the leak repair contractor to the leak location to assess the possibility of clamping the line in an effort to stop the leak. A photo of a typical leak repair clamp is shown in Figure 9.

Chevron Richmond Refinery Investigation Report January 2015 26 U.S. CHEMICAL SAFETY AND HAZARD INVESTIGATION BOARD

Figure 9. Example leak repair clamp for piping.50 It is installed over the leak location to prevent process fluid leakage to the atmosphere. The group then decided to remove the insulation from the 4-sidecut pipe to determine the cause of the leak, a practice Chevron personnel call “daylighting the leak.” This procedure, they determined, would help in the decision either to repair the leak on-line or to shut down the unit. During preparation for the daylighting activity, the fire engine was repositioned in the cold zone to a location approximately 65 feet from the leak, fire monitors51 were set up pointing towards the leak location, and two hose lines were run from the fire engine to a position near the 4-sidecut piping. Two teams of three firefighters operated the hoses. All hoses and monitors were at-the-ready, able to respond should any incident occur. The first attempt to remove insulation was made by pulling on the insulation bands from the ground using a pike pole.52 This was unsuccessful. Rather, the piping actually moved from the force of the pulling, so the group determined it was too dangerous trying to remove the insulation in that way. The group then decided that scaffolding should be built to provide easy access so that firefighters could manually cut loose the piping insulation. At this point, shift change was occurring. Some individuals left for the day, and some volunteered to stay past their shift end time after their relief showed up. This change resulted in an increase of people standing near the 4-sidecut leak location.

50 Photo from http://www.huwa.com/en/vervolgpagina/83/37/HUWA_Split_Barrel/ (accessed June 27, 2014). 51 A fire monitor is a piece of firefighting equipment that sprays water and can be manually aimed and operated. 52 A “pike pole” is a long pole with a hooked metal end commonly used by firefighters.

Chevron Richmond Refinery Investigation Report January 2015 27 U.S. CHEMICAL SAFETY AND HAZARD INVESTIGATION BOARD

Contractors arrived at the scene to build the scaffold (Figure 10). During a pre-response safety meeting consisting of the Incident Commander, a safety officer, firefighters, and key operations personnel, one group of firefighters operating a hose was directed to spray the scaffold builders should an incident occur, and the other group of firefighters operating the second hose was directed to spray the pipe if needed. Three scaffold contractors then built the scaffold beneath the leaking 4-sidecut pipe.

Figure 10. CSB animation of contractors erecting scaffolding beneath the leak location. Once the scaffolding was built, two firefighters were directed to climb the scaffold and remove the aluminum sheathing and insulation (shown in Figure 7) from the 4-sidecut pipe. The battalion chief was aware that vapors leaking from under the insulation could mix with air and “light off,” or catch on fire, as the insulation was removed, so the firefighters made preparations for such a possibility by being at-the- ready with fire hoses. The firefighters on the scaffolding began to remove the aluminum sheathing surrounding the insulation by using a hook to pull the bands securing the insulation and sheathing sufficiently away from the insulation to allow for snipping the bands with cutters. Using this technique, the firefighters were able to remove several three-foot sections of the aluminum sheathing surrounding the insulation. As the firefighters were removing the sheathing of the 4-sidecut line (shown in Figure 7), white hydrocarbon vapor visibly began to emerge from under the now-exposed insulation material. The firefighters continued to remove the sheathing despite the formation of hydrocarbon vapor. During the continued sheathing removal, insulation that was soaked with hot 4-sidecut hydrocarbon autoignited once exposed to oxygen—only feet from the firefighters. The hose teams immediately put out the fire, and both firefighters quickly came down from the scaffold (Figure 11).

Chevron Richmond Refinery Investigation Report January 2015 28 U.S. CHEMICAL SAFETY AND HAZARD INVESTIGATION BOARD

Figure 11. CSB animation of firefighters attempting to remove the 4-sidecut insulation, the resulting fire, and fire extinguishing.

Chevron Richmond Refinery Investigation Report January 2015 29 U.S. CHEMICAL SAFETY AND HAZARD INVESTIGATION BOARD

The firefighters on the scaffolding successfully removed much of the aluminum sheathing surrounding the insulation; however, underlying insulation still obscured the location of the leak. Directed by the operations personnel, the Chevron Fire Department sprayed the insulation with hard, straight streams using the fire hoses in an attempt to knock the insulation off the pipe. The hose teams knocked off the insulation up to the location where the aluminum sheathing had been removed. At this point, they realized that the leak had significantly worsened; hydrocarbon liquid was now spraying from the pipe. Several operations managers present then decided to shut the unit down, an action that requires hours to complete. 3.3 Consequences A vapor cloud quickly began to accumulate. The hose teams attempted to keep the cloud at bay by spraying it with firefighting water. Suddenly, the vapor cloud worsened, engulfing 19 firefighters and operators standing in both the hot zone and cold zone in the hot hydrocarbon cloud. The cloud was dense and very hot, and many of the individuals caught in the cloud were not able to see anything around them. One person caught in the cloud told the CSB that he could not see his hand if he had held it directly in front of his face. Each person engulfed in the cloud began working their way out of the vapor cloud. Several of the firefighters operating the two hoses dropped to their hands and knees to follow their hose lines to safety, feeling their way out of the cloud (Figure 12).

Figure 12. CSB animation of firefighters who dropped to their hands and knees to escape the vapor cloud. At approximately 6:30 p.m., two minutes after the large vapor cloud formed, the light gas oil ignited.53 Eighteen employees safely escaped from the cloud just before ignition. One employee, a firefighter, was inside a fire engine that was engulfed in the fireball when the light gas oil ignited (Figure 13 and Figure

53 Shown by surveillance video recording.

Chevron Richmond Refinery Investigation Report January 2015 30 U.S. CHEMICAL SAFETY AND HAZARD INVESTIGATION BOARD

14). He told CSB interviewers, “… All I could see [was] heavy hydrocarbon-type boiling fire in every window of that truck. I can’t even begin to describe how hot it was. It was very intense.” He called “MAYDAY” over his radio but received no response. He informed the CSB, “I figured that everybody else was dead.” Because he was wearing full body firefighting protective equipment, he was able to escape through the flames surrounding the fire truck and make his way to safety without physical injury.

Chevron Richmond Refinery Investigation Report January 2015 31 U.S. CHEMICAL SAFETY AND HAZARD INVESTIGATION BOARD

Figure 13. CSB animation of firefighter who was inside the fire engine when the light gas oil ignited.

Chevron Richmond Refinery Investigation Report January 2015 32 U.S. CHEMICAL SAFETY AND HAZARD INVESTIGATION BOARD

Figure 14. Photo of the burned remains of the fire truck that was consumed by the fire. A firefighter was in the cab when the light gas oil ignited. The fire truck was positioned in the cold zone approximately 65 feet from the leak location. The leak resulted in a large plume of vapor which traveled across the surrounding area. The ignition and subsequent burning of the hydrocarbon process fluid created a large black cloud of smoke, which also swept across the surrounding area (Figure 15). This situation resulted in a Community Warning System (CWS) Level 3 alert,54 and a shelter-in-place55 advisory (SIP) was issued at 6:38 p.m.56 for Richmond, San Pablo, and North Richmond. It was lifted later that night at 11:12 p.m. after the fire was fully under control. In the weeks following the incident, nearby medical facilities received over 15,000 members of the public seeking treatment for ailments including breathing problems, chest pain, shortness of breath,

54 A Community Warning System Level 3 alert indicates that a facility within Contra Costa County has had a release that has offsite impact and is categorized by any of the following events:

  1. Offsite impact that may cause eye, skin, nose and/or respiratory irritation to the general population.
  2. Fire, explosion, heat, or smoke with an offsite impact. Example: On a process unit/storage tank where mutual

aid is requested to mitigate the event and the fire will last longer than 15 minutes.

  1. Hazardous material or fire incident where the Incident Commander or unified command, through consultation

with the Contra Costa Health Services Hazardous Material Incident Response Team, requests that sirens should be sounded. See http://cchealth.org/hazmat/pdf/incident_notification_policy.pdf (accessed April 9, 2013). 55 Contra Costa County considers a shelter-in-place to include going inside a home or nearest building, closing doors and windows, and turning off heating, ventilation, and air conditioning. See http://cchealth.org/emergencies/shelter-in-place.php (accessed February 6, 2013). 56 Chevron U.S.A. Inc. "30 Day Follow-Up Notification Report." September 5, 2012.

Chevron Richmond Refinery Investigation Report January 2015 33 U.S. CHEMICAL SAFETY AND HAZARD INVESTIGATION BOARD

sore throat, and headaches. According to information provided to the CSB by local hospitals, approximately 20 people were admitted to local hospitals as inpatients for treatment.

Figure 15. Initial vapor cloud formation (white cloud) and subsequent ignition (black smoke) as seen from a pier in San Francisco, California.57

57 Photos are from Fototaker.net.

Chevron Richmond Refinery Investigation Report January 2015 34 U.S. CHEMICAL SAFETY AND HAZARD INVESTIGATION BOARD

Figure 16. Vapor cloud and ignition seen from Marin County.58

  1. 0 Technical Analysis

The CSB commissioned Anamet, Inc., a materials engineering and laboratory testing company, to conduct testing of the 4-sidecut pipe, including the failed 52-inch component. The testing concluded that the rupture was due to pipe wall thinning caused by sulfidation corrosion.59 4.1 Sulfidation Corrosion Sulfidation corrosion, also known as sulfidic corrosion,60 is a damage mechanism61 that causes thinning in iron-containing materials, such as steel, due to the reaction between sulfur compounds and iron at temperatures ranging from 450°F to 1000°F.62 For pipe walls, this damage mechanism causes gradual

58 Photo is a screen capture from KTVU Channel 2 News. 59 Anamet, Inc. "Metallurgical Evaluation of Samples from the Chevron U.S.A. Inc., Richmond #4 Crude Unit 8 Inch and 12-Inch 4-Sidecut Piping Involved in the August 6, 2012, Hydrocarbon Release and Fire." Prepared for The Chemical Safety and Hazard Investigation Board (CSB), February 11, 2013. 60 API RP 939-C: Guidelines for Avoiding Sulfidation (Sulfidic) Corrosion Failures in Oil Refineries. 1st ed., Section 3.1.6, May 2009. 61 Piping damage mechanisms are any type of deterioration encountered in the refining and chemical process industry that can result in flaws/defects, thus affecting the integrity of piping (e.g., corrosion, cracking, erosion, dents, and other mechanical, physical or chemical impacts). See API 570: Piping Inspection Code: In-Service Inspection, Rating, Repair, and Alteration of Piping Systems. 3rd ed., Section 3.1.1.5, November 2009. 62 API RP 939-C: Guidelines for Avoiding Sulfidation (Sulfidic) Corrosion Failures in Oil Refineries. 1st ed., Section 1, May 2009.

Chevron Richmond Refinery Investigation Report January 2015 35 U.S. CHEMICAL SAFETY AND HAZARD INVESTIGATION BOARD

thinning over time. Sulfidation corrosion is common in crude oil distillation,63 where naturally occurring sulfur and sulfur compounds found in crude oil feed, such as hydrogen sulfide,64 are available to react with steel piping and equipment. Process variables that affect corrosion rates include the total sulfur content of the oil, the sulfur species present, flow conditions, and the temperature of the system. Virtually all crude oil feeds contain sulfur compounds; therefore, sulfidation corrosion is a damage mechanism present at every refinery that processes crude oil. Sulfidation corrosion can cause thinning to the point of pipe failure when not properly monitored and controlled. Sulfidation corrodes carbon steel at a much faster rate in comparison with its effect on other materials of construction, such as steels with a higher chromium content. This issue is discussed in depth in the CSB’s Interim Investigation Report of the August 6, 2012, Chevron incident.65 In addition to its naturally faster rate of sulfidation corrosion when compared with higher chromium steels, carbon steel can also experience significant variation in corrosion rates due to variances in silicon content, a component used in the steel manufacturing process. Carbon steel piping containing silicon content less than 0.10 weight percent can corrode at accelerated rates,66 up to 16 times faster than carbon steel piping containing higher percentages of silicon. Figure 17 shows how carbon steel corrosion rates can greatly vary depending on silicon content.

63 Distillation separates mixtures into broad categories of its components by heating the mixture in a distillation column where different products boil off and are recovered at different temperatures. See http://www.eia.gov/todayinenergy/detail.cfm?id=6970 (accessed April 4, 2013). 64 Hydrogen sulfide is the most aggressive sulfur compound that causes sulfidation corrosion. 65 http://www.csb.gov/assets/1/19/Chevron_Interim_Report_Final_2013-04-17.pdf (accessed April 2, 2014). 66API RP 939-C: Guidelines for Avoiding Sulfidation (Sulfidic) Corrosion Failures in Oil Refineries. 1st ed., Section 6.2.3.2, May 2009.

Chevron Richmond Refinery Investigation Report January 2015 36 U.S. CHEMICAL SAFETY AND HAZARD INVESTIGATION BOARD

Figure 17. Graph of sulfidation corrosion rates with respect to silicon content in carbon steel. This graph shows how corrosion rates increase in carbon steel containing decreasing percentages of silicon. This information can be found in Annex C of API RP 939-C.67 The refining industry has been aware of increased susceptibility to sulfidation corrosion in low-silicon carbon steel piping since as early as 1974,68 nearly 40 years before the August 6, 2012, incident and two years before the Chevron Crude Unit was constructed. Before the incident, Chevron documented its understanding of the potentially catastrophic nature of failures caused by sulfidation corrosion, as reflected in Chevron’s Corrosion Prevention and Metallurgy Manual: Sulfidation corrosion has caused severe fires and fatalities in the refining industry, primarily because it causes corrosion over a relatively large area, so failures tend to involve ruptures or large leaks rather than pinhole leaks. It can be insidious in that moderately high corrosion rates can go undetected for years before failure. Finally, process changes that increase the temperature or sulfur content can creep up over time and multiply corrosion rates so that what was thought to be a low corrosion rate system becomes corrosive enough to fail before the increased corrosion rate is recognized.

67 The y-axis of this figure is in units of mils per year (mpy). A “mil” is 1/1000 inch. 68 API Publication 943: High-Temperature Crude Oil Corrosivity Studies. September 1974.

Chevron Richmond Refinery Investigation Report January 2015 37 U.S. CHEMICAL SAFETY AND HAZARD INVESTIGATION BOARD

Carbon steel piping is manufactured to meet certain specifications. Prior to the mid-1980s, multiple carbon steel specifications were commonly and independently in use for refinery piping, including American Society for Testing and Materials (ASTM) A53B,69 ASTM A106,70 and American Petroleum Institute (API) 5L.71 ASTM A53B and API 5L do not contain minimum silicon content requirements for carbon steel piping,72 while ASTM A106 requires the piping to be manufactured with a minimum silicon content of 0.10 weight percent. As a result, manufacturers have used different levels of silicon in the carbon steel pipe manufacturing process. Thus, depending on the manufacturing specification for carbon steel, sulfidation corrosion rates could vary depending on the silicon content within the steel. In the mid-1980s, pipe manufacturers began to comply simultaneously with all three manufacturing specifications (ASTM A53B, ASTM A106, and API 5L) when manufacturing carbon steel piping, which resulted in piping being manufactured with at least 0.10 weight percent silicon content due to the ASTM A106 requirement. As a result, the majority of carbon steel piping purchased following this time period for refinery operations likely has a minimum of 0.10 weight percent silicon content. However, piping purchased and installed prior to the mid-1980s could still contain low silicon components susceptible to high, variable sulfidation corrosion rates. The timing of this manufacturing change has a profound impact on the susceptibility of refineries to variable sulfidation corrosion rates today. Over 95 percent of the 144 refineries in operation in the United States, including the Chevron Richmond Refinery,73 were built before 1985,74 before piping manufacturers began producing carbon steel in compliance with all three manufacturing specifications. Therefore, the original carbon steel piping components in these refineries is likely to contain varying percentages of silicon content and may experience highly variable sulfidation corrosion rates. The Chevron Richmond Refinery 4-sidecut piping circuit containing the 52-inch component that failed was constructed of ASTM A53B carbon steel, which had no minimum specification for silicon content. Post-incident testing of samples of the 4-sidecut piping from the Chevron Richmond Refinery identified silicon content ranging from 0.01 weight percent to 0.2 weight percent. Of 12 samples taken from the 8- inch and the adjacent 12-inch 4-sidecut line, six had a silicon concentration of less than 0.10 weight percent (Figure 18 and Figure 19). The 52-inch pipe component that ruptured on the day of the incident had a silicon content of only 0.01 weight percent. Illustrating the inherent variability in ASTM A53B carbon steel sulfidation corrosion rates, the elbow component directly upstream of the 52-inch component that failed had a silicon concentration of 0.16 weight percent and showed considerably less thinning (Figure 20).

69 ASTM Standard A53/A53M-12: Standard Specification for Pipe, Steel, Black and Hot-Dipped, Zinc-Coated, Welded and Seamless, 2012. 70 ASTM Standard A106/A106M–11: Standard Specification for Seamless Carbon Steel Pipe for High-Temperature Service, 2011. 71 API Specification 5L: Specification for Line Pipe. 45th ed., December 2012. 72 ASTM Standard A53/A53M-12: Standard Specification for Pipe, Steel, Black and Hot-Dipped, Zinc-Coated, Welded and Seamless, 2012. 73 The Chevron Richmond Refinery was constructed in 1902. 74 See http://www.eia.gov/tools/faqs/faq.cfm?id=29&t=6 (accessed February 14, 2013).

Chevron Richmond Refinery Investigation Report January 2015 38 U.S. CHEMICAL SAFETY AND HAZARD INVESTIGATION BOARD

Figure 18. Locations of metallurgical samples taken from 8-inch 4-sidecut piping post-incident. The seven samples taken are boxed in orange. Four of the seven components sampled (shown with an orange fill) were found to have a silicon content less than 0.10 weight percent.

Chevron Richmond Refinery Investigation Report January 2015 39 U.S. CHEMICAL SAFETY AND HAZARD INVESTIGATION BOARD

Figure 19. Locations of metallurgical samples taken from 12-inch 4-sidecut piping post-incident. The five samples taken are boxed in orange. Two of the five components sampled (shown with an orange fill) were found to have a silicon content less than 0.10 weight percent.

Chevron Richmond Refinery Investigation Report January 2015 40 U.S. CHEMICAL SAFETY AND HAZARD INVESTIGATION BOARD

Figure 20. 4-sidecut piping sample (E-017-8) analyzed by Anamet Labs showing the relative thickness of low silicon piping on the left and the high silicon piping on the right. The ruptured 52-inch pipe component (left) contained 0.01 weight percent silicon, and the upstream elbow component (right) contained 0.16 weight percent silicon.75 The initial nominal thickness of this piping was 0.322-inch.

75 Anamet, Inc. "Metallurgical Evaluation of Samples from the Chevron U.S.A. Inc., Richmond #4 Crude Unit 8- Inch and 12-Inch 4-Sidecut Piping Involved in the August 6, 2012, Hydrocarbon Release and Fire." Prepared for: The Chemical Safety and Hazard Investigation Board (CSB), February 11, 2013.

Chevron Richmond Refinery Investigation Report January 2015 41 U.S. CHEMICAL SAFETY AND HAZARD INVESTIGATION BOARD

  1. 2 Sulfidation Corrosion Inspection Techniques

As evidenced by the chemical analysis performed on the Chevron 4-sidecut piping post-incident, carbon steel piping components within a single circuit76 can contain varying percentages of silicon, resulting in a large variation in sulfidation corrosion rates by component. Current corrosion inspection guidance documents allow for the measurement of pipe thickness at a minimal number of permanent Condition Monitoring Locations (CMLs)77 along the piping length.78,79 These CMLs are most frequently placed on elbows and fittings80 because higher turbulence in these areas usually results in the fastest metal loss.81 However, due to details of the manufacturing process, carbon steel elbows and pipe fittings, even when manufactured to the ASTM A53B specification, generally contain relatively high percentages of silicon.82 When measurements are taken only at high silicon-containing fittings, the measurements can fail to identify high corrosion rates within a pipe circuit occurring within low-silicon, straight-run piping components. API Recommended Practice (RP) 939-C Guidelines for Avoiding Sulfidation (Sulfidic) Corrosion Failures in Oil Refineries describes the challenges when attempting to inspect carbon steel lines susceptible to sulfidation corrosion. The recommended practice states that older ASTM A53B piping, such as the Chevron piping that failed on August 6th, creates a “major inspection challenge”83 and “unless the refinery is fortunate enough to have located an inspection point on that particular [low silicon] section of pipe or fitting, it is very difficult to detect the thinning component.”84 It states that in some applications, carbon steel will appear to be adequate based on measured corrosion rates until failure occurs at some undocumented or unidentified low-silicon component.85 At the Chevron Richmond Refinery, the 8-inch 4-sidecut piping had a total of 19 CMLs86 on piping and fittings. Historically, most of the CMLs measured corrosion rates at high silicon pipe-fitting components, such as elbow components. An effort in 2011 added additional CMLs on straight-run components within

76 A piping circuit is a length of pipe and the fittings associated with a particular process service that operate at similar conditions. A circuit usually begins and ends at either a branch or a piece of process equipment, such as a vessel or a pump. Reference to piping by circuits allows piping to be grouped conveniently by proximity and operating service. Piping circuits may also be referred to as piping runs. 77 A condition monitoring location (CML) is a designated area where periodic thickness examinations are conducted. Each CML represents as many as four inspection locations located circumferentially around the pipe. CMLs are also referred to as thickness monitoring locations (TMLs). CMLs were historically referred to as corrosion (rather than condition) monitoring locations, and that terminology is sometimes still used within the industry. 78 API 570: Piping Inspection Code: In-service Inspection, Rating, Repair, and Alteration of Piping Systems, 3rd ed., Section 5.6.3, November 2009. 79 For most damage mechanisms that affect an entire piping circuit, the whole circuit loses metal at a similar rate. Monitoring pipe thickness at a minimal number of CMLs is considered representative of the entire pipe. 80 A fitting is a piping component usually associated with a change in direction or diameter. 81 API 570: Piping Inspection Code: In-service Inspection, Rating, Repair, and Alteration of Piping Systems, 3rd ed., Section 5.6.2, November 2009. 82 API RP 939-C: Guidelines for Avoiding Sulfidation (Sulfidic) Corrosion Failures in Oil Refineries, 1st ed., Section 7.1.5, May 2009. 83 Ibid., Section 9. 84 Ibid., Section 7.1.5. 85 Ibid., Section 6.2.3.2. 86 Many of these CMLs were added during the 2011 turnaround.

Chevron Richmond Refinery Investigation Report January 2015 42 U.S. CHEMICAL SAFETY AND HAZARD INVESTIGATION BOARD

the 8-inch 4-sidecut piping circuit, although 100 percent component inspection was not performed. The CSB found that, although a CML was located on the adjacent upstream elbow, no CMLs were placed on the low silicon piping component that failed (Figure 21). Chevron identified corrosion in the 52-inch component during a supplemental 2002 inspection,87 but the inspection results were not entered into the CML-tracking portion of the inspection database, and no new CML was required to be added to ensure future monitoring. As a result, the 52-inch component was never inspected again (Section 5.1.2.1.1).

Figure 21. CML placement on 8-inch 4-sidecut piping. Nineteen CMLs were used to monitor corrosion rates in the 8-inch 4-sidecut piping. A CML was not placed on the 52-inch component that ultimately failed. A CML was placed, however, on the upstream elbow adjacent to the 52-inch component. This inspection data gathered using the 19 CMLs did not reflect the corrosion rates of the quickly corroding, low-silicon components of the 4-sidecut piping. As illustrated by the Chevron incident, traditional inspection techniques alone—using only a limited amount of CMLs—may not accurately identify the most aggressive sulfidation corrosion rates throughout an entire circuit of carbon steel piping.

87 The inspector was supervising contractors who were conducting measurements on a CML located on the adjacent elbow. Prompted by a recent Chevron corrosion study, he decided to have them also measure the straight pipe about one foot before and after the elbow, on the other side of the welds, by radiographic thickness techniques (RT). These were not formal CMLs. In 2002, the 52-inch component had lost roughly a third of its original wall thickness. The only documentation of this measurement was a note in a history brief in the inspection database.

Chevron Richmond Refinery Investigation Report January 2015 43 U.S. CHEMICAL SAFETY AND HAZARD INVESTIGATION BOARD

Low-silicon components can remain uninspected and unidentified until failures such as the August 6, 2012, Chevron incident occur. As discussed in the CSB’s Interim Investigation Report of the Chevron incident and again in this report, upgrading material of construction to steels with higher chromium content is a more effective means of managing sulfidation corrosion. Indeed, Chevron’s internal “New Construction Guidelines” recommend that piping installed in high temperature and high sulfur service be constructed with 9-Chrome steel. 4.3 Silicon Characterization Techniques Determining silicon content in existing carbon steel piping and equipment in the field is a difficult undertaking. To characterize the silicon content in each component of a piping circuit properly, every component must be inspected. This is known as 100 percent component inspection. Two techniques are used to identify low-silicon content and resulting variable corrosion rates in existing carbon steel piping circuits with unknown chemical composition: (1) performing chemical analysis; or (2) performing pipe wall thickness measurements of every carbon steel component.88 Silicon Characterization Technique Description Chemical composition analysis of each component

Shavings of piping are analyzed in a laboratory to determine silicon content. Requires weld identification and insulation removal.

Thickness measurement of each component

Identifies gross differences in component thicknesses due to differing silicon concentrations. Must be performed on piping that has been in- service for long enough time to detect corrosion rate differences. Requires weld identification and insulation removal.

Table 1. Silicon characterization technique. Many field-portable instruments used for Positive Material Identification89 (PMI) cannot adequately identify silicon content.90,91 If original manufacturing quality assurance data92 are not available, as is

88 Pipe wall thickness measurement is difficult because of the high operating temperatures of piping subject to sulfidation corrosion. These measurements are commonly made only when the piping is out of service and cool, for example, during a unit maintenance activity. 89 Positive Material Identification is the identification and chemical analysis of various metal alloys through nondestructive methods. 90 API RP 939-C: Guidelines for Avoiding Sulfidation (Sulfidic) Corrosion Failures in Oil Refineries. 1st ed., Section 7.1.5, May 2009. 91 Recent technological advances may allow for nondestructive silicon detection using a hand-held composition analyzer. See http://www.olympus-ims.com/en/applications/using-handheld-xrf-to-manage-sulfidation-corrosion- in-carbon-steel/ (accessed October 29, 2014)

Chevron Richmond Refinery Investigation Report January 2015 44 U.S. CHEMICAL SAFETY AND HAZARD INVESTIGATION BOARD

generally the case with older plants, then chemical verification requires destructive testing. Metal shavings must be taken from each carbon steel piping component for chemical analysis in a laboratory.93 Care must be taken not to contaminate the sample with bits of metal from the tools used to gather the sample. Carbon steel components containing low concentrations of silicon can also be identified by performing one-time thickness measurements of every component within a carbon steel circuit.94 This practice is only useful as a means to ascertain silicon content if the piping circuit has been exposed to sulfidation corrosion for a long enough time period so that variances in corrosion rate caused by differences in silicon content may be detected. Chemical analysis is, therefore, the most reliable technique to identify low- silicon carbon steel components. Both characterization techniques require identification of each piping component, typically by removing insulation (so every weld seam can be located), a time consuming and costly undertaking. Weld seams can be located through insulation using specialized equipment and examination techniques, but this method can be less accurate than when weld seams are identified manually. Both silicon characterization techniques can be technically difficult and physically hazardous for inspectors because of the high operating temperatures of piping subject to sulfidation. It is common to make thickness measurements or take shaving samples only when the piping is out of service and cool, for example, during a unit maintenance turnaround.95 Unlike silicon concentration, the chromium concentration of steel can easily be verified in the field using portable positive material identification instruments. In addition, steel alloys containing at least 9 weight percent chromium are more resistant to sulfidation corrosion and do not run the risk of extreme variations in corrosion rates within components in the same piping circuit.96 This makes alloys with at least 9 weight percent chromium content an inherently safer choice97 in high temperature sulfidation corrosion environments because the hazard presented by varying corrosion rates within a single piping circuit is eliminated. As shown in the Modified McConomy Curves98 from API RP 939-C (Figure 22), higher chromium steels are also a better safeguard than carbon steel because sulfidation corrosion rates are

92 Manufacturing quality assurance data, also known as mill data, provides the chemical composition of the steel. 93 API RP 939-C: Guidelines for Avoiding Sulfidation (Sulfidic) Corrosion Failures in Oil Refineries. 1st ed., Section 7.1.5, May 2009. 94 Ibid., Section 7.1.5. 95 A “turnaround” is a scheduled shutdown of a process unit to perform maintenance, repairs, upgrades, and inspection of process equipment. 96 The protective scale, FeCr2S4, begins to be the dominant scale formed in steels containing a chromium content of five weight percent. The 5Cr steel alloy can be manufactured to contain anywhere from 4 percent to 6 percent chromium. Thus, “the sulfidation corrosion rate can vary dramatically in 5Cr steels even in the same operating environment.” See Niccolls, E. H., J. M. Stankiewicz, J. E. McLaughlin, and K. Yamamoto. "High Temperature Sulfidation Corrosion in Refining." 17th International Corrosion Congress. Las Vegas: NACE International, 2008. 97 Steels with higher chromium content are inherently safer than carbon steel with respect to sulfidation corrosion because they can eliminate the hazard of gross variations in corrosion rates within a single piping circuit. However, analysis is still required to ensure that the best material of construction is selected. 98 Modified McConomy Curves are the set of curves API RP 939-C uses to predict sulfidation corrosion rates versus temperature for several steel alloys.

Chevron Richmond Refinery Investigation Report January 2015 45 U.S. CHEMICAL SAFETY AND HAZARD INVESTIGATION BOARD

greatly reduced. Carbon steel99 corrodes approximately nine times faster than 9-Chrome steel, which contains 9 percent chromium, and carbon steel corrodes approximately 120 times faster than stainless steel, which contains 18 percent chromium.100,101

Figure 22. Modified McConomy Curves from API RP 939-C. 4.4 Inherently Safer Design Efforts to improve chemical process safety require the identification of process hazards, followed by the elimination, mitigation, or control of process hazards to reduce the overall risk of a process. A hazard can be defined as a “situation with the potential for harm.” Risk is then defined as a function of both the consequence (hazard) and likelihood (frequency).102 Risk reduction can be achieved by using, in order of robustness, inherently safer design, passive safeguards, active safeguards, and procedural safeguards.103 This can be thought of as a tiered or hierarchical approach to risk management, commonly referred to as a “hierarchy of controls.” The further

99 ASTM A53B carbon steel contains a maximum of 0.40 weight percent chromium. 100 9-Chrome contains 9 weight percent chromium. 101 These values were calculated using the McConomy Curves at 630°F. 102 Center for Chemical Process Safety (CCPS). Inherently Safer Chemical Processes – A Life Cycle Approach. 2nd ed., Section 2.1, 2009. 103 Ibid. 100.0

Chevron Richmond Refinery Investigation Report January 2015 46 U.S. CHEMICAL SAFETY AND HAZARD INVESTIGATION BOARD

up the hierarchy, the more effective the risk reduction achieved (Figure 23). Inherently safer design104 reduces risk by permanently reducing or eliminating a defined hazard itself, while safeguards defined as passive (design features), active (detection and automatic response), and procedural (policies, procedures, training, inspection, use of personal protective equipment) reduce risk by reducing the ultimate consequence or likelihood of the hazard.105

Figure 23. Hierarchy of controls. The further up the hierarchy (further to the left as shown here), the more effective the risk reduction achieved. Figure developed from concept presented in Kletz, Trevor; Amyotte, Paul. Process Plants: A Handbook for Inherently Safer Design, 2nd ed; 2010. These definitions are published by the Center for Chemical Process Safety (CCPS), a not-for-profit corporate membership organization within the American Institute of Chemical Engineers that identifies and addresses process safety needs within the chemical, pharmaceutical, and petroleum industries.106 The CCPS book Inherently Safer Chemical Processes, 2nd ed. designates a process as inherently safer “if it reduces or eliminates the hazards associated with materials and operations used in the process and this reduction or elimination is permanent and inseparable.”107 A facility can approach its inherently safer design strategy by looking for opportunities to minimize, substitute, moderate, or simplify.108 The August 6, 2012, sulfidation corrosion pipe rupture at the Chevron Richmond Refinery highlights a missed opportunity to incorporate inherently safer design strategies through the use of more robust materials of construction. CCPS states: The concept of inherent robustness … applies to designing equipment to be impervious to the corrosion mechanisms that are present given the materials of construction and within the process, and the operating conditions (i.e., temperature, pH, concentration, viscosity, etc.). The use of certain alloys will eliminate certain types of corrosive attack. […] Although robust equipment design may be considered to be a passive safeguard rather than an inherently safer design, it considerably simplifies the remainder of the process design. Therefore, it fits within the definition of simplification [an inherently safer design strategy]. It is also highly effective in eliminating the possibility of an uncontrolled loss

104 The concept of “inherently safer design” was first established by Trevor Kletz in 1977 in response to the 1974 Flixborough explosion in England. He presented a lecture titled “What You Don’t Have, Can’t Leak” at the Jubilee Lecture for the Society of Chemical Industry. 105 Center for Chemical Process Safety (CCPS). Inherently Safer Chemical Processes – A Life Cycle Approach. 2nd ed., Section 2.1, 2009. 106 www.aiche.org/ccps/about (accessed February 14, 2013). 107 Center for Chemical Process Safety (CCPS). Inherently Safer Chemical Processes – A Life Cycle Approach. 2nd ed., Section 2.2, 2009. 108 bid., Section 3.5.

Chevron Richmond Refinery Investigation Report January 2015 47 U.S. CHEMICAL SAFETY AND HAZARD INVESTIGATION BOARD

of containment. In a general sense, the removal of this possibility from a process design must be considered to be inherently safer.109 Thus, the use of a higher chromium steel alloy, such as 9-Chrome, is an inherently safer design strategy that could have prevented the Chevron Richmond Refinery pipe rupture. Installation of 9-Chrome piping during turnaround opportunities prior to the August 6, 2012, incident to replace the 4-sidecut carbon steel would have both eliminated the hazard of silicon-based variable corrosion rates within the components of the 4-sidecut piping circuit and at the same time also greatly reduced the underlying inherent rate of sulfidation corrosion. The use of 9-Chrome steel also simplifies the procedural inspection safeguards required, as 100 percent component inspection would not be required to monitor corrosion rates in steels containing at least 9 percent chromium; the typical inspection strategy of monitoring corrosion rates using a minimal amount of CMLs would be sufficient. It is important to remember that inherently safer design strategies are relative; a specific design can only be described as inherently safer when compared to a different design with regard to a specific hazard or risk.110 A design may be inherently safer by eliminating one hazard, but can inadvertently introduce or aggravate another hazard.111 For this reason, performing a comprehensive, documented hazard analysis is vital for identifying the individual hazards and the likelihood of those hazards occurring, followed by identifying how they can be effectively controlled to minimize overall risk. The review should include risks of personal injury, environmental harm, and lost production, as well as evaluating economic feasibility.112 An inherently safer systems review incorporated as an integral part of this hazard analysis generates an optimized list of hazard control choices, offering various degrees of inherently safer design strategies. Effectively implementing inherently safer design provides an opportunity for preventing major chemical incidents. The August 6, 2012, incident at Chevron and other incidents113 throughout the refining industry highlight the difficulty in preventing failure caused by sulfidation corrosion in low silicon carbon steel piping solely through inspection—a procedural safeguard that is thus among the least effective on the hierarchy of controls. Implementing inherently safer design concepts to the greatest extent feasible by Chevron and other refiners and chemical plant operators will avoid hazards such as variation in sulfidation corrosion rate in carbon steel piping due to hard-to-determine silicon content, and it will provide a higher degree of protection from incidents similar to the one that occurred on August 6, 2012.

109 Center for Chemical Process Safety (CCPS). Inherently Safer Chemical Processes – A Life Cycle Approach. 2nd ed., Section 4.5.1, 2009. 110 Center for Chemical Process Safety (CCPS). Guidelines for Engineering Design for Process Safety. 2nd ed., Section 5.2, 2012. 111 Center for Chemical Process Safety (CCPS). Inherently Safer Chemical Processes – A Life Cycle Approach. 2nd ed., Section 3.6, 2009. 112 Ibid., Section 8.6.4. 113 API RP 939-C: Guidelines for Avoiding Sulfidation (Sulfidic) Corrosion Failures in Oil Refineries. 1st ed., May 2009.

Chevron Richmond Refinery Investigation Report January 2015 48 U.S. CHEMICAL SAFETY AND HAZARD INVESTIGATION BOARD

  1. 0 Incident Analysis

The CSB investigation team developed an accident map (AcciMap)114 for the Chevron investigation (Figure 24). The AcciMap is a multilayered causal diagram that depicts immediate causes115 as well as higher level contributing causes at the corporate, governmental, and regulatory levels. This diagram includes five levels:

  1. Outcomes: the impact of the August 6, 2012, event to workers present and the surrounding

community;

  1. Physical Events and Conditions: the immediate causes of the incident as displayed in a traditional logic

tree;

  1. Chevron: company rules and policies; conduct of turnarounds; risk management; identification of

hazards and evaluation of safeguards; adoption of internal recommendations; safety programs; and emergency response;

  1. Industry Codes and Standards: good practice guidelines that provide safety requirements and

recommendations on topics including mechanical integrity and emergency response; and

  1. Government: laws and legislation developed to regulate process safety at refineries.

Some of these contributing factors are discussed in the Chevron Interim Report and the Chevron Regulatory Report. Refer to the AcciMap in Figure 24116 as a guide to locating information.

114 The AcciMap was originally developed by Jens Rasmussen in the article Rasmussen, Jens. “Risk Management in a Dynamic Society: A Modelling Problem.” Safety Science. Vol. 27, No 2/3, 1997; pp. 183-213. The AcciMap was subsequently used and popularized by Andrew Hopkins, in Hopkins, Andrew. “Lessons From Longford: The Esso Gas Plant Explosion.” CCH Australia Limited: Sydney, 2000; Chapter 10. 115 Immediate causes are the events or conditions that lead directly to an incident, such as mechanical failure or human error. 116 A high-resolution graphic of the AcciMap can be found on the CSB website.

Chevron Richmond Refinery Investigation Report January 2015 49 U.S. CHEMICAL SAFETY AND HAZARD INVESTIGATION BOARD

Figure 24. Acci-Map of August 6, 2012, Chevron Refinery Fire.

Chevron Richmond Refinery Investigation Report January 2015 50 U.S. CHEMICAL SAFETY AND HAZARD INVESTIGATION BOARD

  1. 1 Organizational Analysis

In the ten years prior to the incident, a small number of Chevron personnel with knowledge and understanding of sulfidation corrosion made recommendations to increase inspections or upgrade the material of construction in the 4-sidecut piping. Their recommendations were not effectively implemented. The process to implement important, safety-critical projects within the Chevron Richmond Refinery was not fully effective. As discussed in the following sections and depicted in Figure 25, a combination of (1) reliance on a turnaround management program that depended on only a fraction of necessary data to make important process safety decisions, (2) an unsuccessful bottom-up approach— with no management oversight or accountability—for implementing a crucial safety program, and (3) no formal method to track to completion the Chevron expert group’s findings and recommendations ultimately caused these recommendations to not be implemented.

Figure 25. Organizational decision-making schematic showing attempts to have carbon steel 4-sidecut piping 100 percent component inspected or replaced with a higher chromium steel alloy. Attempts failed due to lack of accountability and lack of authority to ensure recommendation implementation, and a rigid turnaround planning process that could not approve the 4-sidecut piping replacement recommendations. Figure 26 shows the sequence of sulfidation corrosion-related recommendations and events within Chevron Corporation and the Chevron Richmond Refinery between 2002 and the day of the incident. These events are discussed in subsequent sections of this report.

Chevron Richmond Refinery Investigation Report January 2015 51 U.S. CHEMICAL SAFETY AND HAZARD INVESTIGATION BOARD

Figure 26. Key events at the Richmond refinery between 2002 and 2012. The following sections discuss Chevron programs designed to improve equipment reliability and process safety. These programs are summarized in Figure 27 and Figure 28.

Chevron Richmond Refinery Investigation Report January 2015 52 U.S. CHEMICAL SAFETY AND HAZARD INVESTIGATION BOARD

Figure 27. Chevron Corporation refinery process safety programs.

Chevron Richmond Refinery Investigation Report January 2015 53 U.S. CHEMICAL SAFETY AND HAZARD INVESTIGATION BOARD

  1. 1.1 Chevron Energy Technology Company

In this section:

Within Chevron is a separate business unit called the Chevron Energy Technology Company (ETC). This unit provides technology solutions and technical expertise for Chevron operations worldwide (Figure 28). Chevron ETC technical staff has considerable knowledge and expertise regarding sulfidation corrosion, specifically with respect to corrosion rate variations caused by differing silicon concentration in carbon steel piping. Chevron ETC employees have authored industry papers on sulfidation corrosion and had significant influence in the development of the industry sulfidation corrosion recommended practice, API RP 939-C. This recommended practice, first published in 2009,117 was developed under Chevron leadership. Metallurgists within ETC had shared their knowledge on sulfidation corrosion via many outlets over the years to employees at Chevron refineries, as discussed in the following sections. Despite all of this institutional expertise, the 4-sidecut line ruptured due to sulfidation corrosion at the Chevron Richmond Refinery.

117 As of January 2015, the 2009 edition of API RP 939-C is the active edition of this standard.

Chevron Richmond Refinery Investigation Report January 2015 54 U.S. CHEMICAL SAFETY AND HAZARD INVESTIGATION BOARD

Figure 28. Chevron Energy Technology Company (ETC) organizational roles. ETC provides technology solutions and technical expertise throughout all Chevron (and affiliated companies) operations.

  1. 1.1.1 ETC Sulfidation Failure Prevention Guidance

At the approximate time of publication of API RP 939-C, Chevron ETC metallurgists released within Chevron a formal report dated September 30, 2009, nearly three years before the incident, titled Updated Inspection Strategies for Preventing Sulfidation Corrosion Failures in Chevron Refineries (hereinafter referred to as ETC Sulfidation Failure Prevention Initiative). The ETC Sulfidation Failure Prevention Initiative clearly indicates that Chevron technical experts understood the high likelihood that the consequence of a sulfidation corrosion failure could be a rupture or catastrophic failure. It specifically calls out Chevron’s need for action: Sulfidation corrosion failures are not common in Chevron or in the industry but they are of great concern because of the comparatively high likelihood of blowout or catastrophic failure…. This can happen because corrosion occurs at a relatively uniform rate over a broad area so a pipe can get progressively thinner until it actually bursts rather than leaking at a pit or local thin area. In addition the process fluid is often above its autoignition temperature. The combination of these factors means that sulfidation corrosion failures frequently result in large fires.… [S]everal case histories of sulfidation corrosion failures … have occurred in Chevron or in the industry, several of which are blowouts. The Chevron ETC Sulfidation Failure Prevention Initiative specifically recommends that inspectors perform 100 percent component inspection on high temperature carbon steel piping susceptible to sulfidation corrosion. The initiative defines a priority ranking system to help focus the inspection efforts. The process conditions of the 4-sidecut stream—operating temperatures greater than 600°F— placed it in the highest priority category for inspection. In 2010, Chevron ETC technical experts issued a corporate newsletter focusing on materials and corrosion, again warning of the potential consequence of sulfidation failures. This newsletter reiterated

Chevron Richmond Refinery Investigation Report January 2015 55 U.S. CHEMICAL SAFETY AND HAZARD INVESTIGATION BOARD

the recommendation from the 2009 ETC Sulfidation Failure Prevention Initiative to conduct 100 percent component inspection of carbon steel piping systems that operated over 600°F. The Richmond Crude Unit 4-sidecut piping fell within this high-priority inspection category. This newsletter was accessible to all employees on Chevron’s company intranet. Chevron ETC also regularly hosted training sessions for refinery personnel. One of these classes, designed for refinery inspection staff but also attended by refinery engineers and senior operators, focused specifically on crude units and on corrosion mechanisms within crude units—including sulfidation corrosion. One of the main messages from this training was that sulfidation corrosion in piping containing low-silicon components can result in catastrophic rupture, and that the means to prevent rupture from occurring is performing 100 percent component inspection or upgrading to a higher chromium steel (Figure 29 and Figure 30).

Figure 29. Presentation slide of ETC training course that guided refinery staff to perform 100 percent component inspection on high-temperature lines susceptible to sulfidation corrosion.

Chevron Richmond Refinery Investigation Report January 2015 56 U.S. CHEMICAL SAFETY AND HAZARD INVESTIGATION BOARD

Figure 30. Presentation slide of ETC training course that guided refinery staff on ways to reduce risk from sulfidation corrosion. The 2009 ETC Sulfidation Failure Prevention Initiative report was circulated to reliability managers and metallurgists at the individual refineries, as well as to the corporate reliability expert. The authors of the Chevron ETC report chose to send the report to these individuals specifically because they seemed to be the right people to perform and advocate for the necessary inspection and replacement work. However, the CSB discovered that the Reliability Department at the Chevron Richmond Refinery believed that the 100 percent component inspection initiative recommended by the ETC sulfidation failure prevention guidance, while important safety work, was an ambitious, unfunded, and unsupported initiative which could not be effectively performed solely within the normal budget and headcount resources of the Reliability group. Also, the Reliability group made attempts to forego the burdensome inspection initiative and simply implement the ETC alternative sulfidation mitigation strategy to improve sulfidation corrosion resistance through using higher chromium steel by recommending replacement of the 8-inch 4- sidecut piping with inherently safer higher chromium steel.118 However, these recommendations were denied on multiple occasions during the Chevron turnaround planning process (Section 5.1.2). As discussed in the following sections, the Chevron programs created to ensure that necessary work was performed to maintain reliable, safe operation and corporate-wide process safety were not successful in preventing the rupture that had the potential to seriously harm 19 Chevron employees on August 6, 2012. 5.1.1.2 Chevron ETC Conclusions Despite many attempts by Chevron ETC to warn and educate refinery personnel, neither 100 percent component inspection of high-risk carbon steel piping nor upgrading susceptible piping to an inherently safer material of construction was fully performed at the Chevron Richmond Refinery. In practical terms, because Chevron ETC was a separate business entity within the Chevron corporation and had no direct authority over the reliability management within the Chevron refineries, Chevron ETC sulfidation corrosion experts had limited influence on what actually occurred within refineries in their areas of expertise. These individuals did not participate in refinery-specific processes such as Process Hazard

118 Shown in Figure 30, ETC’s senior inspector and analysis training taught inspectors that sulfidation corrosion resistance could be improved by upgrading susceptible piping circuits to steels containing higher percentages of chromium.

Chevron Richmond Refinery Investigation Report January 2015 57 U.S. CHEMICAL SAFETY AND HAZARD INVESTIGATION BOARD

Analyses (PHAs)119 (see Chevron Interim Investigation Report) and did not affect decisions concerning monitoring and control of sulfidation corrosion during the Crude Unit turnaround process (Section 5.1.2). No formal system is in place at the Chevron Richmond Refinery to communicate to the refinery management and to track to completion ETC findings and recommendations. While Chevron does use an indicators tracking program (Section 5.1.6), the program does not measure the implementation status of ETC recommendations and new industry guidance determined by Chevron technical experts to be critical in ensuring continued safe operations at Chevron refineries.

119 A process hazard analysis is a hazard evaluation to identify, evaluate, and control the hazards involved in a process. Facilities that process a threshold quantity of hazardous materials, such as the Chevron Richmond refinery, are required to conduct a process hazard analysis per the California Code of Regulations Title 8 Section

  1. Process Safety Management of Acutely Hazardous Materials (1992). PHAs are also required by the

California Accidental Release Prevention Program and the federal EPA Risk Management Program. See the CSB’s Chevron Interim Investigation Report for a full analysis on this subject.

Chevron Richmond Refinery Investigation Report January 2015 58 U.S. CHEMICAL SAFETY AND HAZARD INVESTIGATION BOARD

  1. 1.2 Chevron Turnaround Management

In this section:

Chevron uses a turnaround planning and implementation process called Initiative for Managing Pacesetter Turnarounds, known within Chevron as the IMPACT process. It is organized into several different phases, each with a specific objective. The IMPACT process begins several years before each scheduled turnaround. Chevron’s stated goal of the IMPACT process is to perform turnarounds efficiently and effectively, ensuring that only the necessary work items that must be performed during the turnaround are performed, and all other items that can be performed on-the-run (while the unit is operating) or during the next turnaround are not included in the work scope. The turnaround work approval process is guided by what Chevron calls a “Framing Document.” It is developed over a year before the planned turnaround, by a group including turnaround planning management, a decision review board, and specific process unit managers. An IMPACT “Core Team” comprised of an operations representative, inspector, design engineer, process engineer, capital project representative, and maintenance representative are the main decision makers regarding what potential work items meet the requirements of the Framing Document and thus have the potential to be automatically included in the turnaround. The work items that pass the

Chevron Richmond Refinery Investigation Report January 2015 59 U.S. CHEMICAL SAFETY AND HAZARD INVESTIGATION BOARD

Framing Document test are then prioritized.120 A group of refinery managers determine a priority cutoff, and only items in this high-priority, Framing Document-approved list are automatically included in the turnaround scope. The items below the priority cutoff are reviewed by refinery managers and can be included in the turnaround scope on a case-by-case basis. The Core Team follows the strict criteria described in the turnaround Framing Document when approving or denying requested turnaround work submitted by refinery employees. If the Core Team determines that a potential work item does not meet the Framing Document requirements, it never reaches the prioritization step, so it is not part of a review by the refinery managers. 5.1.2.1 2007 Crude Unit Turnaround The Framing Document used for the 2007 Crude Unit turnaround specified that the primary requirements for the turnaround included performing any work needed to assure a minimum of 10 years (two turnaround cycles) before the next inspection or maintenance was required, performing all required compliance inspections, and recertifying state operating permits for boilers. The detailed work list criteria for the turnaround are shown in Figure 31.

120 The prioritization was based on a combined severity and likelihood of impacts in four individually-weighted categories: health, safety, environmental, and production. The higher the sum of these four values, the higher the priority for the potential work item.

Chevron Richmond Refinery Investigation Report January 2015 60 U.S. CHEMICAL SAFETY AND HAZARD INVESTIGATION BOARD

Figure 31. Work list criteria requirements specified in the Framing Document used during Chevron’s 2007 Crude Unit turnaround. 5.1.2.1.1 Recommendations Regarding 4-Sidecut Line for 2007 Turnaround The first recommendations to upgrade or 100 percent component inspect the 4-sidecut line were made for the 2007 Crude Unit turnaround. One such recommendation was based upon the findings from the 2002 turnaround. In August 2002, a Chevron Richmond Refinery employee analyzed sulfidation corrosion rates in the Crude Unit and identified potentially vulnerable areas based on process conditions. The employee discovered that the 4-sidecut operating temperature had increased, concluding this increase would cause more hydrogen sulfide to evolve, leading to increased sulfidation corrosion rates. The employee’s study recommended increased inspection of the 4-sidecut piping and noted that this piping might need upgrading from carbon steel to 5-Chrome, a steel alloy containing five percent chromium that is more resistant to sulfidation corrosion. In 2002, proactively following up on this study, the Crude Unit inspector conducted additional piping inspection and identified corrosion in a 52-inch 4-sidecut component, which is the component that ultimately failed on August 6, 2012. The corrosion was found during inspection on a component that was not a typical inspection location (i.e., not an official CML).

Chevron Richmond Refinery Investigation Report January 2015 61 U.S. CHEMICAL SAFETY AND HAZARD INVESTIGATION BOARD

Chevron inspection guidelines require that findings from additional discretionary inspection must be recorded only as notes in a “history brief” rather than input in the inspection database as is typically done for CMLs. Therefore, documentation of the corrosion identified in 2002 was recorded only as notes and was not formally input as data into the inspection database of permanent CML measurements. (An example of inspection database data appears in Figure 32.) The inspector formally recommended upgrading this piping during the next shutdown in 2007 to the IMPACT core team.

API does not require new CMLs to be established on components with non-uniform corrosion in potentially low silicon carbon steel piping circuits. Such a requirement in API RP 939-C would help to ensure that components experiencing non-uniform corrosion are effectively monitored, managed, and replaced to prevent sulfidation corrosion failures.

Figure 32. Sample Inspection Database report analyzed by unit inspectors when determining piping remaining life and when making piping replacement recommendations. This Inspection Database report is also analyzed by the IMPACT core team to determine Framing Document applicability.

Adhering to the Chevron turnaround work scope procedures, the IMPACT core team analyzed the available inspection data of the 4-sidecut line from the inspection database to determine whether upgrading the 4-sidecut piping met the Framing Document requirements. The recommendation to upgrade the 4-sidecut piping did not meet the 2007 turnaround Framing Document requirement #10, as all

Chevron Richmond Refinery Investigation Report January 2015 62 U.S. CHEMICAL SAFETY AND HAZARD INVESTIGATION BOARD

recorded data in the inspection database (from existing CMLs on relatively high-silicon piping fittings) indicated that the 4-sidecut piping upstream of the pumps had sufficient thickness to continue to safely operate until the next turnaround before requiring further inspection or maintenance. The recommendation to upgrade the 4-sidecut piping also did not meet the 2007 turnaround Framing Document requirement #5, as the IMPACT core team believed it was not a substantiated high-risk reliability issue because existing inspection data did not indicate an imminent reliability problem. It was determined, however, that the 4-sidecut piping downstream of the pumps required replacement,121 based on the same process of analysis, and only that piping was replaced with an upgraded, inherently safer material of construction, 9-Chrome (Figure 33).

Also prior to the 2007 turnaround in February 2006, a team consisting of a materials and corrosion engineer, an inspector, a process engineer, a metallurgist, and a design engineer issued a Corrosion Mitigation Plan for the Chevron Richmond Refinery Crude Unit. This report was developed specifically for the Area Business Unit (ABU) Manager, the highest ranking manager for the Crude Unit. The report specifically identified the 4-sidecut piping to be at risk from high temperature sulfidation corrosion. The team issued the following recommendation: Recommendation – Install Guided Wave bracelets [on the 4-sidecut piping] during the [2007 Crude Unit] Turnaround so that 100% volumetric inspection of the line can be done to ensure that there are no piping sections in the line that are corroding faster than the majority of the line…. [The] piping needs to be monitored in anticipation of future replacement and additionally, industry experience shows that sections of piping with low silica [sic] content will corrode at higher rates. Monitoring this section of line using global inspection technique like guided wave is the fastest way to determine if there are thin piping pups in the system.

121 The piping downstream of the pumps operates at a higher pressure, and thus the Minimum Required Thickness calculated was thicker than for the piping on the suction side of the pumps.

Chevron Richmond Refinery Investigation Report January 2015 63 U.S. CHEMICAL SAFETY AND HAZARD INVESTIGATION BOARD

Figure 33. Crude column schematic indicating the piping downstream of the 4-sidecut pumps that was replaced during the 2007 Crude Unit turnaround. The portion of the carbon steel line containing the component that failed on August 6, 2012 was not replaced. The recommendation to perform 100 percent volumetric inspection through the use of experimental guided wave technology was accepted and implemented by the ABU Manager. 122 The inspection recommendation met the framing document requirement #5 and requirement #8, as it was specified to be based upon past industry sulfidation experience and was approved by the ABU Manager. However, this recommendation was only partially implemented. The guided wave bracelets were installed only on a small portion of the 4-sidecut line, which did not include the 52-inch component that ultimately failed on

122 Common volumetric inspection techniques include ultrasonic and radiography testing.

Chevron Richmond Refinery Investigation Report January 2015 64 U.S. CHEMICAL SAFETY AND HAZARD INVESTIGATION BOARD

August 6, 2012.123 Furthermore, when the experimental guided wave bracelet data proved to be unreliable, manual 100 percent component inspection was not implemented to address the low-silicon piping component corrosion concerns raised in the February 2006 recommendation. In addition, because the Crude Unit inspector’s discretionary inspection observations were not input into the CML-tracking portion of the inspection database as an official CML (discussed earlier in this section), the 52-inch component in which the inspector identified corrosion in 2002—the component that failed on August 6, 2012—was never inspected again. 5.1.2.2 2011 Crude Unit Turnaround The Framing Document for the 2011 Crude Unit Turnaround states that some of the goals of the 2011 turnaround were to perform work to ensure a five year run; perform compliance inspections and requirements; and perform safety, environmental, and process improvement work that required a shutdown. The work list criteria requirements for the turnaround appear in Figure 34.

Figure 34. Work list criteria requirements specified in the Framing Document used during Chevron’s 2011 Crude Unit turnaround.

123 It was later determined that the guided wave data was unreliable, so the Crude Unit inspector resumed inspections using ultrasonic thickness measurements.

Chevron Richmond Refinery Investigation Report January 2015 65 U.S. CHEMICAL SAFETY AND HAZARD INVESTIGATION BOARD

A key change from the 2007 Framing Document directly affected whether work items such as 100 percent component inspection or replacement of the 4-sidecut could obtain Core Team approval. In 2007, the Core Team could approve a work item as meeting 2007 Framing Document criterion #10 for inspection, repair or replacement of equipment or piping if it was needed to ensure a minimum of 10 years (two turnaround cycles) before the next inspection or if maintenance was required. The guided wave inspection devices on the 4-sidecut met this criteria. In 2011, this Framing Document criterion was deleted. The Core Team in 2011 should refuse any work item for inspection, repair, or replacement of equipment or piping unless it required a rate cut or shutdown within only 5 years, before the next turnaround (items #2 and #6). 5.1.2.2.1 Recommendations Regarding 4-Sidecut Line for 2011 Turnaround Following the release of the Chevron ETC Sulfidation Failure Prevention Initiative report, discussed in Section 5.1.1, the Chevron Richmond Refinery materials group completed the risk-ranking of the carbon steel piping in the Richmond Lube Oil Project Unit (RLOP) and in the Crude Unit, two units with high temperature piping known to be susceptible to sulfidation corrosion. The group identified the Crude Unit 4-sidecut line as a high-risk line based on the report ranking guidance. Instead of requesting funding to perform the 100 percent component inspection, the group recommended the 4-sidecut for replacement with 9-Chrome. Just as when planning for the 2007 turnaround, the IMPACT team denied the recommendation because the inspection data available for the 4-sidecut piping did not support a material upgrade during the 2011 turnaround. The IMPACT team did not consider the lack of data on potentially more susceptible 4-sidecut straight-run pipe components. Chevron also conducts “Intensive Process Reviews” prior to turnarounds. This process involves knowledgeable individuals including Business Improvement Network leaders, process engineers, metallurgical engineers, design engineers, and turnaround planners. The review aims to identify key unit issues that should be addressed and repaired during the unit turnaround. Before the 2011 Crude Unit turnaround, Chevron personnel conducted an Intensive Process Review of the Crude Unit and specifically recommended that the 4-sidecut carbon steel piping “should be upgraded to [5-Chrome] […] due to sulfidation.” Although the Intensive Process Review identified sulfidation problems in the 4-sidecut line, this activity was ineffective. The 4-sidecut piping was not upgraded during the 2011 Crude Unit turnaround because the IMPACT core team determined that it did not meet the turnaround framing document requirements. During the 2011 turnaround, a portion of the 12-inch 4-sidecut piping was identified as unacceptably thin and was replaced. The 12-inch 4-sidecut piping was the same age, material of construction, and contained the same process fluid with similar process conditions124 as the 8-inch 4-sidecut piping. However, because Chevron relies on existing data to make equipment replacement decisions, employees did not consider that these significant sulfidation corrosion findings could be indicative of similar thinning that could be occurring in the 8-inch piping. This was another missed opportunity during the 2011 Crude Unit turnaround to identify that the 8-inch 4-sidecut piping needed replacement.

124 The CSB notes that the process conditions of the 8-inch and 12-inch 4-sidecut piping were not identical.

Chevron Richmond Refinery Investigation Report January 2015 66 U.S. CHEMICAL SAFETY AND HAZARD INVESTIGATION BOARD

  1. 1.2.3 Chevron Richmond Refinery Turnaround-Planning Conclusions

There were no 4-sidecut line inspection data indicating that the 8-inch 4-sidecut piping had thinned significantly enough from sulfidation corrosion to require replacement of the piping. Rather, the limited CML data, extrapolated to apply to the entire pipe, including the portion containing the component that failed on August 6, 2012, indicated that the pipe could remain in service until the 2016 turnaround. This oversight occurred for two reasons: (1) 100 percent component inspection was never performed, and (2) recorded data existed only on high-silicon components that corroded at much slower rates than the low- silicon 52-inch component. Chevron’s data-driven turnaround management framework led to unintended negative consequences. The current Chevron Richmond Refinery turnaround planning framework denies potential, discretionary turnaround work that does not yet have hard data gathered from refinery equipment to support it, even if the work request is based upon guidance issued by the industry trade association, American Petroleum Institute. This rejection is true even if, as in the case of 100 percent component inspection for sulfidation damage, the purpose of the work request is to actually generate the hard data. The only way a Chevron employee can have a work request approved based solely on industry guidance is to appeal to the ABU Manager for the work as an exception to the turnaround framing document criteria. (See 2007 turnaround Framing Document work criteria #8 and 2011 turnaround Framing Document work criteria #9.) The CSB cannot conclusively state whether even this method would have resulted in the approval to replace the 4-sidecut line, but Chevron reliability and metallurgical staff never attempted it. These individuals had not previously been in the position of having to convince management of the importance of their turnaround work recommendations, so advocating the Sulfidation Failure Prevention Initiative and persuading upper management to implement the ETC recommendations would be a foreign work area for them. In addition, no high-level manager was assigned responsibility to ensure that the ETC Sulfidation Failure Prevention Initiative or other ETC sulfidation recommendations were included in the turnaround scope. As a result, lower level employees who did not have decision-making or funding authority were burdened with convincing Chevron Richmond Refinery management to implement new industry guidance and the ETC recommendations. The requirement for hard data to justify turnaround work even affected decisions to mitigate hazards identified during a turnaround. During the 2011 turnaround, thinning from sulfidation corrosion in the 12-inch portion of the 4-sidecut piping was found to be so severe that the 12-inch piping had to be replaced immediately. Yet, Chevron replaced only the portions where hard data was available on the specific pipe to support the replacement. The hazardous condition did not prompt Chevron turnaround management to inspect all of the 4-sidecut piping or to preemptively implement the longstanding recommendation to replace all of the carbon steel portions. Post-incident, Chevron performed 100 percent component inspection of all Chevron Richmond Refinery Crude Unit piping susceptible to sulfidation corrosion. Four carbon steel piping components out of the 4,600 components inspected were identified to have higher corrosion rates than adjacent piping.125 Each

125 Steve Wildman (Chevron) letter to Randall Sawyer (Contra Costa Health Services), April 12, 2013. http://www.ci.richmond.ca.us/DocumentCenter/View/26802 (accessed June 30, 2014).

Chevron Richmond Refinery Investigation Report January 2015 67 U.S. CHEMICAL SAFETY AND HAZARD INVESTIGATION BOARD

of these four piping segments of which Chevron was unaware might have ultimately failed like the 52- inch 4-sidecut segment. This inspection activity may have prevented additional pipe ruptures in the unit due to accelerated sulfidation corrosion in low-silicon carbon steel.

Chevron Richmond Refinery Investigation Report January 2015 68 U.S. CHEMICAL SAFETY AND HAZARD INVESTIGATION BOARD

  1. 1.3 Chevron Unit Reliability Improvement Process

In this section:

Chevron’s Unit Reliability Improvement Process (URIP) formally integrates a broad range of reliability activities. This program applies to all of Chevron’s wholly owned refineries. The overall URIP consists of several sub-processes, including Reliability in Asset Integrity, Resolution of Significant Reliability Opportunities, Risk Assessment and Asset Strategy, Condition Monitoring and Surveillance, Proactive Maintenance, and Maintenance and Failure Prevention. Beginning in 2009 as part of the URIP process, Chevron refineries began holding monthly Unit Reliability Briefs (URBs) as a forum for discussing short-term and long-term equipment reliability issues. Participants in these meetings include operators, process engineers, area inspectors, materials engineers, machinery reliability employees, maintenance employees, and management, such as the ABU Manager. These meetings proved ineffectual in securing safety critical improvements on several occasions. Documentation indicates that the high risk of sulfidation corrosion in the 4-sidecut piping was discussed at least twice in the URB meetings in the years leading to the incident. In 2010, a discussion on the need

Chevron Richmond Refinery Investigation Report January 2015 69 U.S. CHEMICAL SAFETY AND HAZARD INVESTIGATION BOARD

to replace the 4-sidecut piping to 9-Chrome resulted in a recommendation to replace the piping during the 2011 turnaround. However, the IMPACT Core Team ultimately denied replacement (Section 5.1.2.2.1). In 2012, URB meetings raised the need for additional inspection of the 4-sidecut line. In early 2012, a plan was implemented to increase inspection on the 8-inch 4-sidecut line, but the plan did not include the complete 100 percent component inspection recommended by the ETC Sulfidation Failure Prevention Initiative. Upper management, with decision-making and funding authority, was not assigned to—nor took ownership of—assessing implementation of the ETC Sulfidation Failure Prevention Initiative or similar ETC strategies in the refinery. The net result was that the URB meetings were not successful in effectively advocating for the ETC Sulfidation Failure Prevention Initiative. The action items developed in the URB meetings were not implemented, and high-risk piping susceptible to sulfidation corrosion was not properly inspected or replaced. Also part of the URIP process is a Reliability Steering Committee (RSC) meeting which occurs twice per month at the Chevron Richmond Refinery. Participants include the reliability manager, operations manager, ABU Manager, and materials and design personnel. These meetings aim to help steward reliability in the Chevron refineries. Specifically, this committee is responsible for “[d]evelop[ing] a Long-Term Reliability Plan consisting of prioritized, sequenced, and resource scoped recommendations for achieving long-term reliability objectives.” This committee also monitors long-term reliability improvement plan work requests to completion. The RSC discussed the ETC Sulfidation Failure Prevention Initiative and assigned the refinery’s materials engineers to ensure its effective implementation at the Richmond refinery. The materials engineers risk-ranked piping in the Richmond refinery based on the ETC report’s guidance. In late 2010, the refinery materials engineers and the inspectors presented a case to the IMPACT core team for the Richmond Lube Oil Project (RLOP) turnaround to perform 100 percent component inspection of various piping segments during its 2011 turnaround. This group also presented the recommendations of the ETC Sulfidation Failure Prevention Initiative report to the IMPACT core team, informing the group that this initiative was what prompted the 100 percent component inspection recommendations. Because the IMPACT team concluded that the inspection could be performed on-the- run when the unit was operating, they denied the 100 percent component inspection work request for the 2011 RLOP turnaround. Nevertheless, disagreements surfaced among the IMPACT team and the individuals who submitted the recommendations regarding the feasibility, safety, and accuracy of measuring thickness on high-temperature piping while the unit was operating. Some employees felt that performing thickness measurements on-the-run was unsafe. In fact, the inspection database was set up to define any pipe over 450°F as too hot to safely inspect on-the-run. In addition to safety concerns, accuracy was also suspect. Thickness testing on hot piping is extremely difficult to do accurately. However, this objection was also overruled, in this case based on the belief that accuracy was not important because the on-the-run inspection would only be looking for gross differences in pipe component thicknesses. To implement the ETC recommendations in the Chevron Richmond Refinery Crude Unit, the unit’s materials engineer and inspector submitted a request to replace the 4-sidecut piping with 9-chrome, but as discussed in Section 5.1.2.2.1, this recommendation was denied because it did not meet the 2011

Chevron Richmond Refinery Investigation Report January 2015 70 U.S. CHEMICAL SAFETY AND HAZARD INVESTIGATION BOARD

turnaround Framing Document requirement of performing only work to ensure a five-year run. As yet, no data supported that the 4-sidecut piping could not remain in operation for at least another five years. In the case of the 2011 RLOP and Crude Unit turnarounds, Chevron Richmond Refinery staff had attempted to include work items to implement the ETC Sulfidation Failure Prevention Initiative. They made recommendations based on their authority in the Chevron Richmond Refinery inspection and materials engineering departments, and under the auspices of the URIP process and its URB and Reliability Steering Committee programs. However, they were unsuccessful; they were thwarted by the IMPACT turnaround planning process and the rigidity of its Framing Documents. No additional implementation efforts or appeals to refinery management were attempted, and no high-level refinery managers who attended URBs and Reliability Steering Committee meetings took responsibility of the ETC Sulfidation Failure Prevention Initiative and ETC sulfidation mitigation recommendations to ensure their effective implementation in the Richmond refinery.

Chevron Richmond Refinery Investigation Report January 2015 71 U.S. CHEMICAL SAFETY AND HAZARD INVESTIGATION BOARD

  1. 1.4 Chevron Fixed Equipment Reliability Business Improvement Network

In this section:

Chevron uses a corporate-wide equipment reliability expert group, called the Fixed Equipment Reliability Business Improvement Network (FER BIN), to monitor ongoing reliability efforts at each Chevron refinery as well as to promote new reliability improvement programs and align reliability practices at all of the Chevron refineries. The FER BIN is intended to be a “best practice” network that brings up to date changes in industry standards into Chevron. It is headed by a technically qualified subject-matter expert, the FER BIN Leader, who advocates for the implementation of new industry best practices or new reliability initiatives, such as the ETC Sulfidation Failure Prevention Initiative. Significant change occurred in the Chevron Business Improvement Network (BIN),126 and the FER BIN in particular, right after the ETC Sulfidation Failure Prevention Initiative was issued. The individual who

126 The Chevron Business Improvement Network (BIN) incorporates all areas of expertise needed to ensure process safety and mechanical integrity in Chevron refineries (e.g., expertise in specific chemical processes, rotating equipment expertise, and fixed equipment reliability expertise).

Chevron Richmond Refinery Investigation Report January 2015 72 U.S. CHEMICAL SAFETY AND HAZARD INVESTIGATION BOARD

was in the FER BIN Leader role when the ETC Sulfidation Failure Prevention Initiative was issued retired in September of 2010, before the initiative was fully developed and implemented. This previous FER BIN Leader had been in the role for many years, and had a close working relationship with ETC, including those responsible for developing the ETC Sulfidation Failure Prevention Initiative. Also in 2010, the organization to which the various BIN Leaders reported was restructured. They now reported to a new organization encompassing process safety, reliability, and energy management for the entire manufacturing organization. The structure of the new organization was changed as a result, and every position was filled “from a clean sheet of paper.” A replacement for the FER BIN Leader position was not assigned until four months after the previous FER BIN Leader’s retirement, in January 2011, and the onboarding process for the new FER BIN Leader’s roles and responsibilities took additional time because of the hiring delay. The FER BIN meets periodically to discuss status of ongoing reliability improvement strategies. One of the strategies that the FER BIN was tasked to focus on was implementing the ETC Sulfidation Failure Prevention Initiative at all of the Chevron refineries. The FER BIN 2012 business plan included a task item to develop and implement “shaping plans” at Chevron refineries to inspect for high temperature sulfidation. The FER BIN Leader was charged with tracking progress of the shaping plans at each refinery. However, the CSB found that the new FER BIN Leader had minimal authority to enforce implementation of the ETC Sulfidation Failure Prevention Initiative at the Chevron Richmond Refinery. No employees within the refinery directly reported to the FER BIN Leader. In addition, despite the IMPACT core team’s decision power, it did not analyze the fixed equipment reliability shaping plans when making turnaround work item decisions. No requirements existed in the IMPACT Framing Documents to comply with shaping document directives. In March 2012, five months prior to the incident, the FER BIN Leader visited the Chevron Richmond refinery and identified that inspection of all carbon steel components susceptible to sulfidation corrosion was not being performed as recommended by the ETC Sulfidation Failure Prevention Initiative (Figure 35). In addition to identifying that CML placement for piping may need to be reassigned, this review found that the IMPACT team was denying critical inspection recommendations during the turnaround planning process. The FER BIN Leader identified that Richmond refinery leadership needed to review and implement the 2009 Chevron ETC Sulfidation Failure Prevention Initiative report and recommendations.

Chevron Richmond Refinery Investigation Report January 2015 73 U.S. CHEMICAL SAFETY AND HAZARD INVESTIGATION BOARD

Figure 35. Presentation slide showing corporate reliability leader’s findings that the Richmond Refinery was not complying with the ETC Sulfidation Failure Prevention Initiative. When the FER BIN Leader visited refineries, he met solely with inspection managers and inspectors to track progress. He did not meet with higher management within the Richmond refinery, such as the ABU Manager, to give updates on whether the inspection group was meeting corporate expectations. His assumption was that the individual refinery lead inspectors would use the knowledge he provided to shepherd new safety programs outlined in the refinery FER shaping plan. However, that implementation strategy did not work at the Chevron Richmond Refinery. (See Section 5.1.2.) Despite the existence of the FER BIN, it was not successful in ensuring important fixed equipment reliability work was being performed at the Chevron Richmond Refinery. The FER BIN program did not effectively gain commitment from refinery management—the individuals capable of ensuring that the necessary reliability work was being performed—to implement the ETC Sulfidation Failure Prevention Initiative or other ETC recommendations to upgrade susceptible carbon steel piping to inherently safer, higher chromium steel.

Chevron Richmond Refinery Investigation Report January 2015 74 U.S. CHEMICAL SAFETY AND HAZARD INVESTIGATION BOARD

  1. 1.5 Chevron Minimum Pipe Thickness Program

In this section:

Inspection staff at the Chevron Richmond Refinery determines the necessary inspection practices, such as condition monitoring location (CML) placement, inspection time intervals, and minimum allowable pipe thicknesses, by following the Richmond Refinery Piping Inspection Guideline. The inspection staff followed this guideline when monitoring the 4-sidecut piping corrosion rates and “remaining life,” the amount of time before the piping would become unacceptably thin and require replacement. The Richmond Refinery Piping Inspection Guideline refers to two pipe thicknesses that must be known to properly determine remaining life of a pipe:  “Minimum Alert Thickness” (Chevron calls this Flag Thickness) – The “wall thickness value used for triggering the need for quantitative [“Minimum Required Thickness”] and

Chevron Richmond Refinery Investigation Report January 2015 75 U.S. CHEMICAL SAFETY AND HAZARD INVESTIGATION BOARD

half-life assessments.”127 The Richmond Refinery Piping Inspection Guideline assigns the 4-sidecut piping a “Minimum Alert Thickness” of 0.14-inch. This value may be reduced to 0.10-inch based upon a “thorough technical review.”  “Minimum Required Thickness” – The minimum thickness of piping that can withstand the existing pressure and structural stresses. Piping must be replaced before it reaches its “Minimum Required Thickness.” A visual depiction of the 4-sidecut original wall thickness, its Minimum Alert Thickness, and its Minimum Required Thickness appears in Figure 36. Chevron uses a database to store inspection findings, notes, and piping wall thickness values, and to track corrosion rates. This database allows the inspector to input a pipe’s “Min Value,” which can be either the piping’s Minimum Alert Thickness or Minimum Required Thickness—to help to determine a piping circuit’s remaining life.

Figure 36. To-scale schematic of 4-sidecut piping original wall thickness (0.322-inch), Minimum Alert Thickness (0.13-inch), and Minimal Required Thickness (0.11-inch) using API RP 574 default values.

127 API 570 Section 6.3.3 states, “thickness measurements should be scheduled at intervals that do not exceed the lesser of one half the remaining life determined from the corrosion rates…or the maximum intervals recommended” by API 570 Table 2.

Chevron Richmond Refinery Investigation Report January 2015 76 U.S. CHEMICAL SAFETY AND HAZARD INVESTIGATION BOARD

Inspection thickness data obtained during the 2011 turnaround indicated that the piping corrosion rates would result in the 4-sidecut piping wall thickness being reduced to below its 0.14-inch Minimum Alert Thickness before the next shutdown scheduled for 2016. According to the Richmond Refinery Piping Inspection Guideline, the next step would be to calculate a Minimum Required Thickness for the 8-inch 4-sidecut line and then determine if it needed to be replaced immediately, or if replacement could be safely delayed. This evaluation can also be used to lower the Minimum Alert Thickness to 0.1-inch following a thorough technical review. A structural minimum thickness value of 0.036-inch had been calculated for a small piping component on the suction of a 4-sidecut pump earlier during the turnaround. The inspector received this calculation in writing (Figure 37).

Figure 37. Text from Chevron design engineer indicating structural minimum thickness (t(min)) calculation results for small sections of suction piping upstream of the 4-sidecut pumps. A communication breakdown occurred in reviewing these results. The design engineer understood “suction piping” to refer to only a small section of piping upstream of the 4-sidecut pump P-1149, while the inspector understood “suction piping” to refer to the entire 4-sidecut circuit upstream of pump P-1149. They never met to clarify the calculation results. The calculated minimum structural thickness value of 0.036-inch for a small portion of the P-1149 suction piping was applied to the full length of the 8-inch 4- sidecut piping circuit. This calculation was used as a technical justification to reduce the 8-inch 4-sidecut Minimum Alert Thickness to 0.1-inch, and the piping wall thickness was predicted to stay above this Minimum Alert Thickness for at least six years. The 4-sidecut line was therefore allowed to continue operating with replacement scheduled for the next turnaround in 2016. API RP 574: Inspection Practices for Piping System Components gives specific guidance to users on Minimum Alert Thickness and Minimum Required Thickness. API RP 574 provides guidance on minimum thickness values only for piping that operates under 400°F. Piping that operates above this reference temperature of 400°F, such as Chevron’s 4-sidecut piping circuit, could be expected to require even greater minimum thickness values. API RP 574 provides an example of a minimum alert thickness

Chevron Richmond Refinery Investigation Report January 2015 77 U.S. CHEMICAL SAFETY AND HAZARD INVESTIGATION BOARD

of 0.13-inch for piping 6 to 18 inches in diameter. Chevron’s 0.14-inch Minimum Alert Thickness is a conservative value based on API RP 574’s guidance. API RP 574 also provides users with a default minimum structural thickness of 0.11-inch for piping with a diameter of 8-inches—which can be used as the Minimum Required Thickness for piping in lieu of detailed engineering calculations.128 Chevron performed a detailed calculation to determine the 4-sidecut Minimum Required Thickness and the API RP 574 default minimum structural thickness was not used. However, had Chevron used the API RP 574 default minimum structural thickness value of 0.11-inch as the 4-sidecut Minimum Required Thickness, the remaining life of the piping circuit would have been predicted to be less than ten years, and a turnaround planning group discussion should have been triggered to discuss replacement options for the 8-inch 4-sidecut piping. Such a discussion could have resulted in the decision to replace the 8-inch 4- sidecut piping during the 2011 turnaround, and the August 6, 2012, pipe rupture could have been prevented. Chevron allowed adjusting the minimum thickness value in the inspection database based upon an evaluation of existing inspection thickness data and minimum structural thickness calculations. However, its inspection procedures caution the inspector to validate the quality of the data. The Piping Inspection Guideline poses the questions “Were enough measurement points taken; [a]re measurements being taken at the right locations?” Had these questions been effectively considered, evaluation of the Chevron Sulfidation Failure Prevention Initiative could have aided in the determination that there was not sufficient thickness data gathered on the 4-sidecut piping to justify the minimum thickness value change. Chevron does not require a formal multi-person review process to be performed prior to changing minimum thickness values and remaining life predictions. Such a process may have identified that the inspection data was unreliable and insufficient for carbon steel piping susceptible to sulfidation corrosion, and the piping could have been replaced per Chevron’s policies during the 2011 turnaround. Chevron’s minimum pipe thickness program is intended to obtain the maximum life out of piping, yet replace piping before it becomes dangerously thin. However, the program allowed changes to minimum thickness values without a formal multi-person review process and lacked sufficient oversight to ensure the safety questions were adequately considered before minimum thickness values were altered. As a result, the 4-sidecut piping that ultimately failed in 2012 was allowed to continue in operation following the 2011 turnaround inspection findings. The Chevron Richmond Refinery should strengthen its minimum pipe thickness program when determining a piping circuit’s remaining life.

128 This minimum thickness is specified for piping between 6 and 18 inches in diameter that operates at temperatures under 400 ⁰F. The 4-sidecut piping operated at a higher temperature, likely requiring a greater minimum thickness.

Chevron Richmond Refinery Investigation Report January 2015 78 U.S. CHEMICAL SAFETY AND HAZARD INVESTIGATION BOARD

  1. 1.6 Chevron Process Safety Indicators Program

API RP 754: Process Safety Performance Indicators for the Refining and Petrochemical Industries states, “A comprehensive leading and lagging indicators program provides useful information for driving improvement and when acted upon contributes to reducing risks of major hazards….”129 Indicators can reveal safety gaps before an incident occurs. One goal of the use of indicators is to drive continuous safety improvement. Lagging indicators are facts about previous events, such as process safety incidents, that meet a certain severity threshold. Leading indicators are measurements that predict future performance. They help facilities maintain safety protection layers and operating discipline by monitoring items such as equipment selection, engineering design, and specification, technique, and frequency of inspection.130 The CSB’s 2007 BP Texas City investigation report describes the importance of analyzing leading and lagging indicators: Process safety [indicators] provide important information on the effectiveness of safety systems, and an early warning of impending catastrophic failure. The sole use of lagging safety indicators, such as injury rates or numbers of incidents, has been described as trying to drive down the road looking only in the rear view mirror—it tells you where you have been but not where you are headed. Process safety good practice guidelines recommend using both leading and lagging indicators for process safety. Leading indicators provide a check of system functioning—whether needed actions have been taken, such as equipment inspections completed by the target date or PSM action item closure. Lagging indicators, such as near-misses, provide evidence that a key outcome has failed or not met its objective. “Active monitoring” of both leading and lagging indicators is important to the health of process safety systems.131, 132 Chevron uses an online dashboard which was developed in 2009 called Operational Excellence and Reliability Intelligence (OERI) to track 26 different process safety indicators. OERI visually displays the status, represented in red, yellow, or green, of many different process safety indicators: green represents a good indicator status, yellow identifies a couple of action items are necessary, and red represents the need to complete many action items. Management reviews these metrics weekly and schedules monthly meetings to discuss the yellow or red items. OERI also has the ability to project 30 days into the future to show the status of metrics at that future date should no action be taken on these items. The Chevron Richmond Refinery leadership team is held accountable for the status of metrics that they oversee. The refinery manager and the president of global manufacturing meet regularly with the Chevron Richmond Refinery leadership team to discuss status of the metrics they oversee, and this is incorporated into each leadership team member’s performance review. Chevron tracks the following 26 process safety indicators in the OERI database:

129 ANSI/API RP 754: Process Safety Performance Indicators for the Refining and Petrochemical Industries. 1st ed., Foreword, April 2010. 130 Center for Chemical Process Safety (CCPS). Guidelines for Process Safety Metrics. Section 3.1, 2010. 131 U.K. Health and Safety Executive (HSE). Developing Process Safety Indicators: A Step-By-Step Guide For Chemical And Major Hazard Industries, 2006. 132 U.S. Chemical Safety Board (CSB). Investigation Report: Refinery Explosion and Fire (15 Killed, 180 Injured), BP Texas City, Texas, page 185, March 2007.

Chevron Richmond Refinery Investigation Report January 2015 79 U.S. CHEMICAL SAFETY AND HAZARD INVESTIGATION BOARD

 PHA Recommendation Implementation Overdue  Safety Instrumented Systems (SIS) Functions Disabled  SIS Functional Test Overdue  Open Safety Work Requests  Overdue Preventative Maintenance  Inspections Overdue  Overdue training  Training due in 30 days  Permanent MOCs Overdue  Temporary MOCs Overdue  Mechanical Availability  Incident Solutions Overdue  Investigations  Audit Action Items  Pre-Startup Safety Review Exceptions  Overdue Testing of Over Speed Trips  Overdue PRDs (Pressure relief valves) Testing  Days Exceeding Alarm Limit  Critical Process Variable Deviations  Routine Duties not Completed  Work Order Schedule Adherence  Open Temporary Leak Repairs  Utilization (Mechanical Utilization)  Reliability Clock (Mechanical Reliability)  Industrial Safety Ordinance Recommendation Implementation Overdue  Overdue Compliance Assurance Program tasks While Chevron’s OERI database is an excellent framework for tracking leading and lagging indicators to continuously monitor and improve process safety, it does not track the implementation of ETC process safety recommendations or new industry guidance as determined, for example, by Chevron technical experts to be critical to ensuring process safety in Chevron refineries. Such an indicator could have ensured that the ETC Sulfidation Failure Prevention Initiative and its status at the Chevron Richmond Refinery were at the forefront of management’s attention. Including an indicator into the OERI system for tracking the implementation of key ETC process safety recommendations or new industry guidance will aid in preventing future incidents at Chevron refineries. 5.1.7 Stop Work Authority Chevron’s corporate-wide Stop Work Authority policy applies to upstream drilling operations and downstream refining and manufacturing processes. It states:

Chevron Richmond Refinery Investigation Report January 2015 80 U.S. CHEMICAL SAFETY AND HAZARD INVESTIGATION BOARD

Stop Work Authority (SWA) establishes the responsibility and authority of any individual to stop work when an unsafe condition or act could result in an undesirable event. In general terms, the SWA process involves a stop, notify, correct, and resume approach for the resolution.133 In theory, Stop Work Authority is a safety critical power that workers can use to halt operations if they see an unsafe condition or act occurring. On August 6, 2012, Stop Work Authority was not used to require immediate and safe shutdown of the Crude Unit.134 Instead, the unit continued to operate for an extended time, during which the potentially risky removal of insulation from the 4-sidecut pipe took place. The CSB learned in interviews that some personnel participating in the insulation removal process while the 4-sidecut piping was leaking were uncomfortable with the operation and the possible exposure to flammable process fluid. Some individuals recommended that the Crude Unit be shut down, but they did not formally invoke their Stop Work Authority. They left the final decision to the management personnel present. One employee stated to CSB investigators: If we can’t isolate [the 4-sidecut piping] then we’re going to, you know, we should shut down…. At that time, once I gave my opinion, I walked away because I let the head operator handle the decisions, right? Stop Work Authority has been used successfully at the Chevron Richmond Refinery in unsafe work situations (e.g., skipping a step in a procedure, working in unsafe weather conditions, wearing improper personal protective equipment (PPE), employing improper safety precautions when working at heights). The difficulty arises when faced with a process safety situation—a leak, vibration, process upset— especially where shutdowns are being considered. Under these circumstances, there are significant limitations to a Stop Work Authority initiative, the most familiar being the reliance on the individual employee to assert a dissenting viewpoint in an atmosphere where a group of individuals may not agree. Groups of employees working together to solve a problem can be hindered by the “group think” mindset: Without conflict, or without enough conflict, a phenomenon called group think can result. This occurs when group members do not express their personal opinions but rather willingly submit to what the group as a whole thinks. Group think can lead to bad decisions and inappropriate actions.135

133 See http://upstream.chevron.com/contractorgom/forms_policies/stop_work_authority.aspx (accessed July 14, 2014). 134 In its Chevron Regulator Report, the CSB recommended that California enhance and restructure its process safety management (PSM) regulations for petroleum refineries by including specific goal-setting attributes. The recommendation included language to strengthen stop work authority, “The regulation should provide workers and their representatives with the authority to stop work that is perceived to be unsafe until the employer resolves the matter or the regulator intervenes.” http://www.csb.gov/assets/1/19/Chevron_Regulatory_Report_11102014_FINAL_-_post.pdf (accessed December 18, 2014). 135 Society of Manufacturing Engineers. “Personal Effectiveness,” Fundamentals of Manufacturing. 3rd ed. Philip D. Rufe, editor, 2013, page 596.

Chevron Richmond Refinery Investigation Report January 2015 81 U.S. CHEMICAL SAFETY AND HAZARD INVESTIGATION BOARD

Regardless of how a Stop Work program is portrayed, there are a number of reasons why such a program may fail related to the ‘human factors’ issue of decision-making; these reasons include belief that the Stop Work decision should be made by someone else higher in the organizational hierarchy, reluctance to speak up and delay work progress, and fear of reprisal for stopping the job.136 Another significant limitation is that, by design, Stop Work Authority is a decision process embedded into the chaos of the event itself. It becomes an option only when all other barriers have failed—often during a stressful atmosphere such as an emergency situation. Another employee stated to CSB investigators: We asked them, you know, shouldn’t we reevaluate this job, you know, stop it and try to figure something else out, because I’m thinking the leak is not where you say it is. It could be leaking up higher, and it would be a safer thing to shut this line down…. [The operations management present] said ‘This is an emergency. We need it done right now.’ … Everybody seemed to be in agreement that it needed to get done, and I didn’t want to argue anymore, because I don’t want to take any flack for stopping the job myself. These significant shortcomings of Stop Work Authority have been identified in previous CSB investigations. The CSB’s Investigation Report analyzing the refinery fire that occurred at the Tosco Avon Refinery in Martinez, California, on February 23, 1999 states: Tosco management stated that workers had the authority to stop unsafe work activity and should have stopped the line replacement job. However, stop work authority— though a desirable safety policy if properly encouraged—is a less effective measure for incident prevention than good job preplanning for the following reasons:  It is exercised during the execution of work, when pressures to get the job done are generally greater.137  It relies on the assertiveness of individual workers. To attempt to stop a job, a worker may need to assert a position that runs contrary to direct instructions from a supervisor.  Once the job has begun the idling of contractors and equipment can result in significant financial cost to the facility, which can add to the pressure to get the job done without delay.138

136 A 2010 study by The RAD Group of 2,600 workers, primarily oil and gas service employees, found that the surveyed employees directly intervene in only 39% of the unsafe acts that they observe on the job. The study concluded that they did not stop unsafe work because (1) they worry the person who is performing the unsafe work will become angry or defensive and (2) they do not believe they can effectively stop unsafe work. See Ragain, R., Ragain, P., Allen, M. & Allen, M. “Study: Employees Intervene in Only 2 of 5 Observed Unsafe Acts,” Drilling Contractor, January / February 2011. 137 In discussing the management dilemma of production versus process safety, CCPS guidelines state: “The continuity of operations can be best addressed at the planning stage.” See American Institute of Chemical Engineers (AIChE), Center for Chemical Process Safety (CCPS). Plant Guidelines for Technical Management of Chemical Process Safety. 1995c. page 17. 138 U.S. Chemical Safety Board. Investigation Report: Refinery Fire Incident (4 Dead, 1 Critically Injured), Tosco Avon Refinery, March 2001, page 43. See http://www.csb.gov/assets/1/19/Tosco_Final_Report.pdf (accessed November 14, 2013).

Chevron Richmond Refinery Investigation Report January 2015 82 U.S. CHEMICAL SAFETY AND HAZARD INVESTIGATION BOARD

Rather than relying on Stop Work Authority after an emergency process safety situation is identified, a more effective process is to rely upon formal procedures that reduce reliance on the individual,139 for example, having an established predetermined leak response plan. One should not rely on Stop Work Authority as a safeguard because it is not a formal procedure. Rather, it is a “residual reduction” technique, falling below “procedural safeguards” on the hierarchy of controls (Figure 23). With specific decision-making criteria in place, those responding to an emergency process safety event should not have to evaluate risk in the heat of an event, but only determine whether the event meets the predetermined criteria to stop operations and shut down a unit. At the time of the incident, Chevron did not recognize or accommodate the shortcomings of Stop Work Authority in averting major process hazards. The Chevron Stop Work Authority program was not designed to assist operations and emergency response personnel in determining whether taking aggressive emergency response actions to remove insulation from a leaking pipe was a wise decision. Since the incident, Chevron has created a Leak Response Protocol (Section 5.3.4) to lead emergency responders, operators, and other plant personnel in deciding how to handle a leaking pipe. Used effectively, this protocol could alleviate pressure from individuals to rely on their Stop Work Authority during potentially hazardous process operations. Other refiners and petrochemical producers should also take such action to develop process Leak Response Protocols for their facilities to help prevent incidents like the August 6, 2012, Chevron Richmond Refinery pipe rupture and fire.

139 “Experience indicates that effective systems require quite a high degree of formality. The purpose of these systems of work is to ensure a personal and collective discipline, to exploit the experience gained by the organization, and to provide checks to minimize problems and errors. The framework of such systems is typically a set of standing orders or instructions which lay down requirements for the conduct of particular activities.” Mannan, Sam. “Management and Management Procedures.” Lees’ Loss Prevention in the Process Industries: Hazard Identification, Assessment and Control. Volume 1, 4th ed., 2005, page 6/5.

Chevron Richmond Refinery Investigation Report January 2015 83 U.S. CHEMICAL SAFETY AND HAZARD INVESTIGATION BOARD

  1. 1.8 Chevron Organizational Conclusions

The CSB found that Chevron management, engineers, inspectors, and operators all see the importance of having good process safety systems and the value of ensuring that work processes are safe and equipment is reliable. (See Section 5.1.) Despite this mindset and the existing programs, the Chevron Richmond Refinery was unsuccessful in preventing the 4-sidecut pipe from rupturing. A desire to be safe is not enough; to ensure process safety, organizations must have a well-designed, integrated system, rigorous programs, and strong leadership for these programs. The critical flaw in Chevron’s safety programs is their reliance largely on individual personnel assertions and initiatives to implement new important safety programs—a bottom-up approach. While this can occasionally be a successful method, it is not a reliable way to implement safety-critical programs. Lees’ Loss Prevention in the Process Industries states: It is fundamental that responsibility for [safety and loss prevention] should be shared by all concerned in the project…. This does not mean, however, that reliance should be placed simply on individual competence and conscientiousness. It is essential to support the competent people with appropriate systems of work. Experience indicates that effective systems require quite a high degree of formality.140 To get the necessary work implemented, the ETC Sulfidation Failure Prevention Initiative and other ETC training course recommendations relied on the persuasive abilities of individual inspectors and metallurgists—who did not have final decision-making and funding ability. The Chevron turnaround IMPACT process relied solely on a data-driven decision process that did not account for all information, such as ETC publications and industry best practices. Inclusion of any yet-to-be justified work into Chevron Richmond Refinery turnarounds, even under the auspices of industry guidance and company experts, required the willingness of individual engineers or inspectors to step forward and advocate for the effort in the face of an already official IMPACT core team rejection. The Unit Reliability Improvement Process and the Business Improvement Network, among other programs, were ineffective in encouraging implementation of initiatives, such as the ETC Sulfidation Failure Prevention Initiative. Even analytical programs based on hard data and analysis, such as the Richmond Refinery Piping Inspection Guideline and the Operational Excellence and Reliability Intelligence program were not successful. And when these failures resulted in a dangerous leak in the 4- sidecut line, the Stop Work Authority program was ineffective because it relied on individuals to step out of the group-think mindset to persuade others that insulation removal might be dangerous. The failure to prevent this incident is indicative of a fragmented process safety management approach that placed responsibility to implement key process safety recommendations on lower-level employees without sufficient recommendation-approval and funding authority. These systems might have been successful in other incidents before August 6, 2012. However, depending on non-formalized individual

140 Mannan, Sam. “Management and Management Procedures.” Lees’ Loss Prevention in the Process Industries: Hazard Identification, Assessment and Control. Volume 1, 4th ed. 2005, page 6/5.

Chevron Richmond Refinery Investigation Report January 2015 84 U.S. CHEMICAL SAFETY AND HAZARD INVESTIGATION BOARD

employee performance to eliminate low frequency, high consequence events like the August 6, 2012, pipe rupture is often ineffective when systemic failures are present. Chevron can ensure the effectiveness of implementing new safety-critical programs at the refinery level, such as the ETC Sulfidation Failure Prevention Initiative, by developing a formalized system that identifies one individual or group with decision-making authority within each refinery to be responsible and accountable for program implementation. The implementation efforts can then be tracked as a leading indicator, such as in Chevron’s OERI system. CCPS’s Plant Guidelines for Technical Management of Chemical Process Safety states: Each technical element in a process safety management program needs to have a specific person or organizational unit clearly designated as responsible for its design, implementation, and maintenance as well as for proper review. Having this designated “champion” for the activity helps assure that it receives adequate management attention and support.141 At the Chevron Richmond Refinery, many individuals attempted to implement the ETC Sulfidation Failure Prevention Initiative and ETC training course recommendations either to 100 percent component inspect sulfidation-susceptible carbon steel piping or to replace sulfidation-susceptible carbon steel piping with an inherently safer, higher chromium material of construction. However, none of these individuals were held accountable for the implementation status of the ETC Sulfidation Failure Prevention Initiative or other ETC sulfidation prevention recommendations, nor did they have the authority to ensure the initiative and recommendations were implemented. As a result, the 4-sidecut piping was never 100 percent component inspected, nor was it ever upgraded to higher chromium steel before the incident.

141 Center for Chemical Process Safety of the American Institute of Chemical Engineers. Plant Guidelines for Technical Management of Chemical Process Safety. Revised Edition, Appendix 2A, 1995, page 10.

Chevron Richmond Refinery Investigation Report January 2015 85 U.S. CHEMICAL SAFETY AND HAZARD INVESTIGATION BOARD

  1. 2 Industry Sulfidation Corrosion Guidance

Industry organizations and trade associations, such as the American Petroleum Institute (API), the American Society of Mechanical Engineers (ASME), and the National Fire Protection Association (NFPA), develop codes, standards, and recommended practices which define requirements and recommendations to conduct operations safely. Codes, standards, and recommended practices are developed by a committee of experts on the basis of consensus and are often updated on fixed-year intervals. Codes can be adopted as requirements by regulatory agencies or authorities having jurisdiction.142 In addition, since these requirements are often considered Recognized and Generally Accepted Good Engineering Practices (RAGAGEP), regulators can cite industrial facilities for not following them. Codes and standards developed by API give specific information and guidance to industry on the technical details of sulfidation corrosion and ways to inspect piping and equipment susceptible to it. However, the CSB identified significant gaps in these standards. There is varying, sometimes conflicting information in many of API’s standards and recommended practices that describe sulfidation corrosion. All of these publications should align to deliver a constant message to users on inspecting for sulfidation corrosion and preventing sulfidation failures in low-silicon carbon steel. 5.2.1 API RP 939-C: Guidelines for Avoiding Sulfidation (Sulfidic) Corrosion Failures in Oil Refineries API RP 939-C: Guidelines for Avoiding Sulfidation (Sulfidic) Corrosion Failures in Oil Refineries is the primary industry guidance document on ways to monitor and control sulfidation corrosion. It aims “to provide practical guidance to inspectors, maintenance, reliability, project, operations and corrosion personnel on how to address sulfidation corrosion in petroleum refining operations.”143 It was published in 2009 following a string of sulfidation corrosion-related incidents in the early 2000s. The recommended practice cautions that low-silicon carbon steel piping can corrode at an accelerated rate.144 It states that carbon steel will appear to be of sufficient thickness based upon measured corrosion rates, typically at CMLs placed on elbows and fittings with higher silicon content,145 until failure occurs at an unmonitored or unidentified low-silicon piping component.146 API RP 939-C specifically discusses risks associated with sulfidation corrosion in low-silicon carbon steel piping. It acknowledges that older carbon steel piping can have low silicon content, creating:

142 American Petroleum Institute: Procedures for Standards Development. 4th ed., 2009, Section 5.4. See http://www.api.org/publications-standards-and-statistics/~/media/Files/Publications/FAQ/2011-Procedures- Final.ashx (accessed September 15, 2014). 143 API RP 939-C: Guidelines for Avoiding Sulfidation (Sulfidic) Corrosion Failures in Oil Refineries, Introduction, 2009. 144 Ibid., Section 6.2.3.2. 145 Ibid., Section 7.1.5. 146 Ibid., Section 6.2.3.2.

Chevron Richmond Refinery Investigation Report January 2015 86 U.S. CHEMICAL SAFETY AND HAZARD INVESTIGATION BOARD

a major inspection challenge, because small piping sections (pups) or fittings with low [silicon] may corrode at rates 2 to 10 times faster than surrounding higher [silicon] piping. Unless the refinery is fortunate enough to have located an inspection point on that particular section of pipe or fitting, it is very difficult to detect the thinning component.147 The document also communicates the risk of sulfidation corrosion failures, stating “ruptures are possible leading to the potential release of large quantities of hydrocarbon streams,”148 and sulfidation corrosion “continues to be a significant cause of leaks leading to equipment replacements, unplanned outages, and incidents associated with large property losses and injuries.”149 It shows an example of a rupture that occurred due to unmonitored low-silicon carbon steel components (Figure 38 and Figure 39).

Figure 38. Photo from API RP 939-C of a low-silicon pup piece that ruptured at a BP refinery. The surrounding piping had higher silicon content, and the pup piece’s accelerated corrosion rate was unmonitored.

147 API RP 939-C: Guidelines for Avoiding Sulfidation (Sulfidic) Corrosion Failures in Oil Refineries, Section 9, 2009. 148 Ibid., Section 4. 149 Ibid., Introduction.

Chevron Richmond Refinery Investigation Report January 2015 87 U.S. CHEMICAL SAFETY AND HAZARD INVESTIGATION BOARD

Figure 39. Schematic from API RP 939-C of the piping shown in Figure 38. The piping component that ruptured was significantly thinner than the surrounding piping. Despite the known risks of unmonitored sulfidation corrosion rates in potentially low-silicon carbon steel piping components, the CSB found that API RP 939-C specifically refrained from requiring companies to search for low-silicon piping components in their facilities. All guidance given on methods for identifying these components is written in a permissive way that does not require action by the operating companies. Specifically, API RP 939-C requires no action by the operating companies, as it states:  “Some refiners have instituted an approach similar to [positive material identification (PMI)] for identification of these materials. These approaches may involve an initial risk assessment to focus inspections on the circuits representing the highest risk. When mill certificates are

Chevron Richmond Refinery Investigation Report January 2015 88 U.S. CHEMICAL SAFETY AND HAZARD INVESTIGATION BOARD

available, some operators have used them to determine whether low-Si steels were procured and will try to locate the low-Si spools.”150  “Many field portable instruments used for PMI cannot identify silicon to the level needed to distinguish between high and low-Si-containing steel. Chemical verification requires that metal shavings of all components be taken and analyzed in a lab.”151  “As an alternative, insulation can be stripped and each piping segment can be exposed for UT inspection…. […] If a low-Si content material is identified, a risk assessment should be performed to determine if and when it should be replaced. Unless all components in a carbon steel system have been checked for either silicon content or thickness, the inspector should assume that low-Si steel may be present in the system and may corrode at much higher than nominal rates under some conditions.”152 While API RP 939-C informs the user that it “is preferable to specify higher alloy for better corrosion resistance to minimize the reliance on inspection,”153 it does not recommend that the user take such an approach. Susceptible piping contains sulfur species and operates between 450°F and 1000°F.154 Upgrading to a steel alloy that contains at least 9 percent chromium is an inherently safer choice in high- temperature sulfidation environments, and it is higher in the hierarchy of controls155 than inspection. High-chromium steels corrode due to sulfidation at a much slower rate than carbon steel and do not run the risk of extreme variations in corrosion rates within components of the same piping circuit.156 To ensure that a low-silicon carbon steel rupture does not again occur at a U.S. refinery, API RP 939-C should establish minimum requirements to prevent another catastrophic incident as a result of pipe rupture in low-silicon carbon steel piping. It should require 100 percent component inspection of existing in- service carbon steel piping susceptible to sulfidation corrosion that could contain low-silicon components,157 and should recommend users to replace carbon steel piping susceptible to sulfidation corrosion that could contain low-silicon components with a steel alloy that is more resistant to sulfidation corrosion to avoid the necessity to perform the 100 percent component inspection. Had API RP 939-C phrased these enhanced inspection strategies as requirements before the Chevron August 6, 2012, pipe rupture, the 100 percent component inspection and material of construction upgrade would not have been

150 API RP 939-C: Guidelines for Avoiding Sulfidation (Sulfidic) Corrosion Failures in Oil Refineries, Section 7.1.5, 2009. 151 Ibid. 152 Ibid. 153 Ibid., Section 7.1.9. 154 Ibid., Section 1. 155 An effectiveness ranking of techniques used to control hazards and the risk they represent as a hierarchy of controls. See U.S. Chemical Safety Board. Interim Investigation Report: Chevron Richmond Refinery Fire. April

  1. http://www.csb.gov/assets/1/19/Chevron_Interim_Report_Final_2013-04-17.pdf (accessed November 15,

2013). 156 U.S. Chemical Safety Board. Interim Investigation Report: Chevron Richmond Refinery Fire. April 2013, page 22, paragraph 20. http://www.csb.gov/assets/1/19/Chevron_Interim_Report_Final_2013-04-17.pdf (accessed November 15, 2013). 157 Two techniques are used to inspect a component in an existing carbon steel piping circuit with unknown chemical composition for low silicon content and resulting variable corrosion rates: (1) performing laboratory- based chemical analysis of the carbon steel (a “destructive test,” meaning it requires removal of a sample of the steel), or (2) performing pipe wall thickness measurements.

Chevron Richmond Refinery Investigation Report January 2015 89 U.S. CHEMICAL SAFETY AND HAZARD INVESTIGATION BOARD

considered “discretionary work items,” and Chevron management likely would have ensured that its refineries complied with the API requirements. 5.2.2 API RP 571: Damage Mechanisms Affecting Fixed Equipment in the Refining Industry API RP 571: Damage Mechanisms Affecting Fixed Equipment in the Refining Industry is a summary guidance document on the “most likely damage mechanisms affecting common alloys used in the refining and petrochemical industry and is intended to introduce the concepts of service-induced deterioration and failure modes.”158 Sulfidation corrosion is one of the 66 damage mechanisms159 summarized in the recommended practice. API RP 571 includes API RP 939-C as a reference document. However, the body of API RP 571 poses several clarity problems in its discussion of sulfidation corrosion:  Section 4.4.2, Sulfidation, summarizes API RP 939-C in a condensed format. While it does inform the reader that sulfidation corrosion can occur as localized corrosion160 and resistance is achieved by upgrading to a higher chromium alloy,161 its description of high-corrosion rate problems in low-silicon carbon steel is sparse. In fact, silicon is mentioned only once in this section, and this mention is in a figure caption,162 not in the text body.  Section 4.4.2.3, Critical Factors, does not explain that low-silicon carbon steel piping corrodes at a much faster rate than higher silicon carbon steel.  Section 4.4.2.5, Appearance or Morphology of Damage, does not specify that sulfidation corrosion rates can be significantly faster in just a few, individual piping components.  Section 4.4.2.7, Inspection and Monitoring, does not specify that 100 percent component inspection is necessary to identify any low-silicon components in a carbon steel piping circuit. API RP 571 should become more aligned with the content in API RP 939-C so that the information is presented to users in a more consistent way.

158 API RP 571: Damage Mechanisms Affecting Fixed Equipment in the Refining Industry, 2nd ed., Section 1.2, 2011. 159 Ibid., Table of Contents. 160 Ibid., Section 4.4.2.5. 161 Ibid., Section 4.4.2.6. 162 Ibid., Figure 4-117.

Chevron Richmond Refinery Investigation Report January 2015 90 U.S. CHEMICAL SAFETY AND HAZARD INVESTIGATION BOARD

  1. 2.3 API 570: Piping Inspection Code: In-Service Inspection, Rating, Repair, and

Alteration of Piping Systems API 570: Piping Inspection Code: In-Service Inspection, Rating, Repair, and Alteration of Piping Systems specifies “the in-service inspection and condition-monitoring program that is needed to determine the integrity of piping.”163 It discusses different inspection strategies that can be employed based on the type of damage mechanism the piping is susceptible to. The latest version of this document was released six months following the release of API RP 939-C, yet it fails to mention the localized corrosion possibilities in carbon steel susceptible to sulfidation corrosion, nor does it include API RP 939-C as a normative reference.164 Section 5.6.3, CML Selection, provides general guidance to inspectors for determining where to place piping CMLs for various corrosion mechanisms. It states: A number of corrosion processes common to refining and petrochemical units are relatively uniform in nature, resulting in a fairly constant rate of pipe wall reduction…. Examples of such corrosion phenomena include high-temperature sulfur corrosion …. In these situations, the number of CMLs required to monitor a circuit will be fewer than those required to monitor circuits subject to more localized metal loss.165 These statements directly oppose the inspection techniques required to identify low-silicon components in sulfidation-susceptible carbon steel piping circuits. Sulfidation corrosion in carbon steel piping can be localized to only a few components; therefore, 100 percent component inspection is required to identify low-silicon components. In addition, the use of “high-temperature sulfur corrosion” nomenclature rather than “sulfidation corrosion” (as is used in other API publications) can lead to confusion among users. To provide a consistent description of sulfidation corrosion throughout all pertinent API documents, content and nomenclature should be aligned. Sulfidation corrosion should be referenced using the same terminology in all API publications, and the potential for localized corrosion must also be emphasized. In addition, because API 570 is a piping inspection code, this document should also establish the 100 percent component inspection requirements necessary to identify low-silicon components in carbon steel piping circuits susceptible to sulfidation corrosion.

163 API 570: Piping Inspection Code: In-Service Inspection, Rating, Repair, and Alteration of Piping Systems, Section 1.1.2, 2009. 164 A “normative reference” is a reference to another code, standard, recommended practice, or regulation that provides additional useful information. 165 API 570: Piping Inspection Code: In-Service Inspection, Rating, Repair, and Alteration of Piping Systems, Section 5.6.3, 2009.

Chevron Richmond Refinery Investigation Report January 2015 91 U.S. CHEMICAL SAFETY AND HAZARD INVESTIGATION BOARD

  1. 2.4 API RP 578: Material Verification Program for New and Existing Alloy

Piping Systems API RP 578: Material Verification Program for New and Existing Alloy Piping Systems “provides the guidelines for material control and material verification programs….”166 This document does include API RP 939-C as a normative reference167 and discusses specifically the increased susceptibility of low-silicon carbon steel to sulfidation corrosion. Section 4.3.3.4, Process Units Susceptible to Sulfidation, states: Carbon steels with low silicon (<0.10%) content can corrode at an accelerated rate when exposed to hydrogen-free sulfidation conditions. These phenomena are discussed more extensively in API 571 and API 939-C. Owner/users with assets at risk from this type of degradation should consider the risks and the requirements to apply [positive material identification] control in order to determine silicon levels and the extent to which the material may corrode.168 While this guidance document does describe the accelerated corrosion rate that occurs in low-silicon carbon steel piping, it does not require facilities to establish and implement a program to identify low- silicon components that may not have been manufactured to ASTM A106 requirements in carbon steel piping circuits susceptible to sulfidation corrosion. Such a requirement is essential for facilities to successfully identify low-silicon components susceptible to sulfidation corrosion to prevent future pipe rupture incidents similar to the August 6, 2012, Chevron incident. 5.2.5 API RP 574: Inspection Practices for Piping System Components API RP 574: Inspection Practices for Piping System Components “supplements API 570 by providing piping inspectors with information that can improve skill and increase basic knowledge and practices.”169 The recommended practice lists 50 reference documents, including other API standards, that are “indispensible for the application”170 of the recommended practice. Several of these documents specifically discuss certain damage mechanisms. However, API RP 939-C is not listed among the reference documents. In addition, API RP 574 does specifically inform the reader that corrosion rates can be localized in carbon steel piping: “Nonsilicon-killed steel pipe (e.g. ASTM A53 and API 5L) can corrode at higher rates than silicon-killed steel pipe (e.g. ASTM A106) in high-temperature sulfidation environments.”171 However, it does not specifically point the reader to API RP 939-C to learn more information. To align the messages presented in all piping inspection-related API guidance documents, API RP 574 should refer the reader to the more enhanced information in API RP 939-C to increase understanding of important sulfidation corrosion characteristics and failure prevention strategies.

166 API RP 578: Material Verification Program for New and Existing Alloy Piping Systems, 2nd ed., Section 1, 2010. 167 API RP 578: Material Verification Program for New and Existing Alloy Piping Systems. 2nd ed., Section 2, 2010. 168 Ibid., Section 4.3.3.4. 169 API RP 574: Inspection Practices for Piping System Components, 3rd ed., Section 1, 2009. 170 Ibid., Section 2. 171 Ibid., Section 7.4.6.2.

Chevron Richmond Refinery Investigation Report January 2015 92 U.S. CHEMICAL SAFETY AND HAZARD INVESTIGATION BOARD

  1. 3 Chevron Emergency Response to Process Leaks

Following the identification of the leak in the 8-inch 4-sidecut piping circuit on August 6, 2012, a series of decisions ultimately put many people in harm’s way. Chevron has since developed a leak response protocol to be used when determining how to respond to future leaks in the refinery. 5.3.1 Area Control and Hazardous Area Assessment While the 4-sidecut line was leaking high temperature flammable process fluid, 40 individuals entered the Crude Unit. Many of these individuals entered the unit to assist in determining how to handle the leak. Individuals who entered the Crude Unit included the hydroprocessing refinery business manager, the Crude Unit section head, 14 operations personnel, the process engineering team lead, a field safety coordinator, two inspectors, the pipe clamp contractor, three scaffold builders, a pipe fitter, and 15 firefighters. API RP 574: Inspection Practices for Piping System Components warns: “Those who investigate [on-stream piping leaks] may be particularly at risk to the consequence associated with release of the process fluid.”172 A safer practice is to establish a safe location away from the active process leak to perform an analysis of the situation and to determine a path forward. Occupational Safety and Health Administration (OSHA) regulations for emergency response require limiting the number of personnel in the immediate vicinity of the incident “to those who are actively performing emergency operations.”173 Typically, management coordination is provided from an emergency operations center located remotely from the hazards of the emergency situation.174 When Chevron fire department personnel took control of the leak response, the fire fighters created and taped off a 20 foot by 20 foot “hot zone” around the leak location. Chevron defines a hot zone as “the immediate release area [emphasis in the original] of the incident where there is risk of exposure or injuries due to flame contact, radiant heat, or hazardous materials.” The size and location of the hot zone is determined by the Incident Commander.175 For this incident, Chevron had also established a “cold zone” immediately outside of the hot zone perimeter. In this area, key operations staff, additional fire department staff, and the Incident Commander were positioned to provide expert support during the leak response decision-making. The Chevron fire truck that was ultimately destroyed in the fire was also located in the designated “cold zone.”176 When the 4-sidecut pipe ruptured, a very large vapor cloud formed which engulfed all personnel both within the hot zone and standing in what was considered the “cold zone,” or the area where personnel should be safe from the adverse affects of a fire.177 The hot zone designated prior to the pipe rupture was not of sufficient size to ensure that individuals outside of the hot zone were safe from the high- temperature, flammable 4-sidecut process fluid when the sulfidation failure of the pipe occurred. As

172 API RP 574: Inspection Practices for Piping System Components, 3rd ed., Section 9.3, 2009. 173 29 CFR §1910.120(q)(3)(v) (2012). 174 API RP 2001: Fire Protection in Refineries, 9th ed., Section 9.2, 2012. 175 Chevron defines the Incident Commander as the “senior emergency response official” at an incident site who is responsible for overall incident objectives and controlling emergency operations at the site. Additional responsibilities include site hazard assessment to the extent possible all hazardous substances or conditions present are identified, establish hot zone, and address exposure control and PPE selection.” 176 The fire truck was positioned approximately 65 feet from the leak location. 177 National Fire Protection (NFPA) 600: Standard on Industrial Fire Brigades, Section 3.3.30, 2010.

Chevron Richmond Refinery Investigation Report January 2015 93 U.S. CHEMICAL SAFETY AND HAZARD INVESTIGATION BOARD

discussed in subsequent sections of this report, it is beneficial for various personnel with differing areas of process expertise to report their knowledge of the leak properties and potential causes of the leak to the Incident Commander. Had this been effectively communicated on the day of the incident, the Incident Commander might have been informed that the 4-sidecut piping had the potential to catastrophically rupture. This information could have led the incident command team to establish a much larger hot zone area. 5.3.2 Miscommunication regarding 4-sidecut properties The CSB found that many personnel responding to the leaking 4-sidecut pipe were not properly informed through information disseminated in the Incident Command structure of the operating temperature of the line. Interviews show that some firefighters believed the line was operating at a temperature of about 130°F rather than the actual temperature which approached 640°F. The CSB identified that this misunderstanding might have occurred because, during the initial incident response, much of the focus was on determining the flash point of the 4-sidecut fluid. Little to no discussion occurred about the actual operating temperature of the 4-sidecut line, which could have provided the most insight into the hazards of the situation. Furthermore, in a “Scene Safety and Action Plan” that was developed immediately before the leak response, the “Hazard Evaluation” section only identified as a hazard the pressure of the 4-sidecut line, recorded as 25 psi. The temperature of the piping circuit was not recorded. This inattention to the temperature hazard likely resulted in the miscommunication and misunderstanding of the actual operating temperature of the piping. Following the incident, Chevron Fire Department personnel developed an “Event Critique,” which, in part, was used to document areas that did not go well during the response activities. The Event Critique states, “Somewhere in the process, impression was given to [the Chevron Fire Department] that [the 4- sidecut temperature] was only 130 degrees F. [The Chevron Fire Department] [b]elieved [the temperature] to be far below the autoignition temperature and below [the flash point].” Regarding the white vapor formation that occurred during insulation removal (referred to as “smoke”), the Event Critique also states that the firefighters felt they “[n]ever put two and two together that additional smoke [formation was] because product [was] much hotter than 130 degrees.” CSB interviews indicate that had the responders been aware of the actual operating temperature, some likely would have raised concerns about the safety of removing insulation from the hot, leaking piping and concerns regarding the responders’ close proximity to the leak to their supervisors. In addition, no individuals determining how to handle the leak were aware that the leak was coming from a pipe component that had thinned so severely so that it could no longer contain the process fluid. All emergency response activities were conducted under the assumption that the 4-sidecut pipe was of acceptable thickness beneath the insulation. This incorrect conclusion was based on measurements of an adjacent CML—a high silicon-containing elbow—which had been found to be of acceptable thickness during the 2011 turnaround. The OSHA Hazardous Waste Operations and Emergency Response (HAZWOPER) standard states that the Incident Commander “shall identify, to the extent possible, all hazardous substances or conditions

Chevron Richmond Refinery Investigation Report January 2015 94 U.S. CHEMICAL SAFETY AND HAZARD INVESTIGATION BOARD

present.”178 The Incident Commander, as well as the individuals providing technical input to the Incident Commander, did not realize that the leak could be due to a highly thinned, low-silicon carbon steel piping component that could exist within the 4-sidecut piping circuit. Had the potential for a pipe thinned to the point of leak and loss of containment been recognized and communicated, the emergency response would likely have been handled very differently. The group might have decided to immediately shut down the Crude Unit. The firefighter post-incident Event Critique document highlights the need for all individuals to be made aware of operating conditions and potential failure modes, stating that hazard assessments performed prior to response activities must ask “all the proper questions for the hazard being addressed.” This comment indicates that the Incident Command structure did not have sufficient technical expertise reporting to it to provide the necessary information to determine the safest response to the leaking pipe. In this case, that response would have been to shut down the Crude Unit. 5.3.3 Leak Mitigation and Discovery Attempts Worsened Leak Operations and fire department personnel discussed their options to stop the leak. Since the 4-sidecut line could not be isolated from the process, the team decided their options were to 1) install a clamp on the leak while the 4-sidecut line was operating, or 2) shut down the unit to stop the leak and perform maintenance while the line was not in operation. The decision-makers tried to visually confirm the leak location by removing insulation covering the piping before determining whether to clamp the line or shut down the unit. However, attempts to remove the insulation actually worsened the leak, resulting in the ultimate pipe rupture and endangerment to the lives of everyone responding. Post-incident metallurgical analysis indicates that the firefighter pike pole used in an attempt to remove insulation may have stabbed through the highly thinned pipe, worsening the leak (Figure 40 and Figure 41).

178 29 CFR §1910.120(q)(3)(ii) (2012).

Chevron Richmond Refinery Investigation Report January 2015 95 U.S. CHEMICAL SAFETY AND HAZARD INVESTIGATION BOARD

Figure 40. Photo of undamaged179 (top) and burned during incident (bottom) pike pole used in early attempts to remove 4-sidecut insulation.

179http://www.safetyfirstweb.com/firefighting/accessories.html?page=shop.product_details&flypage=flypage.tpl&pr oduct_id=2411&category_id=96 (accessed July 14, 2014).

Chevron Richmond Refinery Investigation Report January 2015 96 U.S. CHEMICAL SAFETY AND HAZARD INVESTIGATION BOARD

Figure 41. Photo showing that tip of fire pole matches apparent puncture location in failed 52-inch component of 4-sidecut piping. To note, because the 4-sidecut leaking component was so thin, clamping the line would not have been a viable option because the pipe likely did not have the structural integrity to support a clamp. However, the potential for a thin pipe was not known by or communicated to the responding operators and Chevron fire fighters. In addition, the high-temperature of the piping and the process fluid introduced a significant hazard to both the individuals who would install the clamp and to individuals who would work near the piping before the clamp installation. If the decision-makers had been aware that the leak might have resulted from pipe thinning to the point of loss of containment, they would have been more likely to shut down the unit without removing the insulation, and this incident could have been prevented. In addition, had it been unacceptable within the Chevron organization to allow high-temperature, flammable process lines to continue leaking until a clamp could be installed, the unit would have been shut down, effectively preventing this incident.

Chevron Richmond Refinery Investigation Report January 2015 97 U.S. CHEMICAL SAFETY AND HAZARD INVESTIGATION BOARD

  1. 3.4 Chevron’s New Leak Response Protocol

OSHA requires that all individuals and organizations performing emergency response operations to follow the HAZWOPER standard.180 In part, HAZWOPER details the organizational structure and response elements to be performed when planning for and responding to an emergency. It requires facilities to develop an Emergency Response Plan that “shall be developed and implemented to handle anticipated emergencies prior to the commencement of emergency response operations.”181 Pursuant to this requirement, Chevron developed an emergency response plan comprised of a number of Refinery Instructions182 outlining the required response activities for specific types of emergencies. For example, the Chevron Richmond Refinery developed Refinery Instructions to be followed in the case of a fire in the refinery, oil spills to the adjacent bay, and releases of hydrogen sulfide, among other emergency situations. However, at the time of the incident, the refinery did not have a specific Refinery Instruction on how to assess and respond to hazardous process fluid leaks in the refinery. Chevron did not recognize this gap in the Chevron Richmond Refinery emergency response plan before the incident. In addition, current industry guidance on developing response plans to hazardous process fluid leaks is limited (Section 5.4). During emergency response operations, such as to a process leak, it is difficult to recall all of the necessary safety precautions and to ensure they are performed. It is therefore essential that process safety emergency response procedures are pre-established and followed to ensure that all safety critical steps are taken before performing any mitigation attempts. If Chevron had used a pre-established response procedure that required consultation with various subject-matter experts (Figure 42), the Incident Commander could have identified that sulfidation-induced failures have historically resulted in large blowouts and catastrophic failures.183 A clamp to mitigate a sulfidation leak would thus have to encompass the entire affected piping segment. The time required to engineer and build a clamp for this type of specialized application can be several days. In addition, the 4-sidecut process fluid was at a temperature near 640°F, which made it very hazardous to work on while in operation. It also meant that if the anticipated catastrophic-type sulfidation failure did occur, the resulting large release would potentially auto ignite. The CSB analysis suggests that had an effective leak response protocol been in place during the August 6, 2012, incident, it likely would have been clear there was little to no chance that the 4-sidecut leak could be stopped and that the Crude Unit should not continue to operate for any significant period. The analysis of the end result for every potential leak mitigation action likely would have resulted in the same decision: to shut down the Crude Unit immediately.

180 29 CFR §1910.120. 181 29 CFR §1910.120(q)(1) (2012). 182 Chevron calls its important internal, refinery-wide policies and procedures “Refinery Instructions.” 183 Chevron ETC Sulfidation Failure Prevention Initiative. See the block quote in Section 5.1.1.1 of this report.

Chevron Richmond Refinery Investigation Report January 2015 98 U.S. CHEMICAL SAFETY AND HAZARD INVESTIGATION BOARD

Figure 42. Ideal communication flow to Incident Commander during refinery process fluid leak incident. In industrial process fluid leak emergency situations, it is essential that various personnel with different areas of expertise communicate their relevant knowledge to the Incident Commander. Since the incident, Chevron has developed a leak response protocol184 to assist operators and fire department personnel when they are deciding how to handle a process leak. The protocol will assist Incident Command in identifying and gathering the pertinent process information prior to the performance of any aggressive action. This new protocol has been incorporated into the Chevron Richmond Refinery emergency response plan as a Refinery Instruction that must be followed when a potentially hazardous process leak is identified in the refinery. Under the new protocol, when a process fluid leak is identified in a Chevron refinery, several steps must be taken immediately. The Chevron emergency response team must deploy to the leak site, the area must be cleared of non-essential personnel, and a group of individuals with various areas of expertise (e.g., operators, managers, unit inspectors, materials engineers, and chemical engineers) must gather in a safe location to discuss the likely cause of the leak and mitigation options.

184 The entire Chevron leak response protocol is presented in Appendix A.

Chevron Richmond Refinery Investigation Report January 2015 99 U.S. CHEMICAL SAFETY AND HAZARD INVESTIGATION BOARD

Chevron’s new leak response protocol also includes a checklist to be completed during the pre-response meeting. It requires the group to answer questions including:  What is the likely cause [of the leak]?;   What is the current operating pressure and temperature?;   What is the pertinent pipe, vessel, structural integrity, or corrosion history of this leak?;   Is the product at or above its auto ignition temperature?;    Is the leak toxic?   This checklist facilitates evaluating all potential hazards when determining how to handle leaks in the refinery. This identification of hazards should allow the Incident Commander to more effectively determine an appropriately sized “hot zone” and safe distances to stage key equipment, such as responding fire engines. The new leak response protocol also provides examples of scenarios when it is required to shut down the unit. (See Figure 43) Effectively using it greatly reduces some of the inherent human factors concerns at play when invoking Stop Work Authority, as discussed in Section 5.1.7.

Figure 43. Chevron’s new Leak Response Protocol, developed post-incident. The new protocol advises plant personnel on when to shut down a unit due to a piping or equipment leak.

Chevron Richmond Refinery Investigation Report January 2015 100 U.S. CHEMICAL SAFETY AND HAZARD INVESTIGATION BOARD

  1. 3.5 Leak Response Conclusions

The piping rupture and subsequent hydrocarbon release occurred two hours after the original leak was identified, which would have been enough time to execute an emergency shutdown of the Crude Unit, or at a minimum, to initiate the shutdown and bring the unit to a much safer condition with no liquid in the 4-sidecut line. Early in this incident, Chevron personnel determined that the 4-sidecut pipe could not be isolated from the crude column. This resulted in the decision to reduce the feed rate to the Crude Column. However, had Chevron decided to shut down the unit once staff knew the line could not be isolated, the pipe rupture and the endangerment of the community and Chevron personnel could have been avoided. At the time of the incident, Chevron did not have procedures to direct when a unit should be shut down. Since the incident, Chevron has developed a leak response protocol that should be used to guide decisions in future leak incidents. If a similar leak were to occur in a Chevron refinery, the new leak response protocol would require unit shutdown. 5.4 Industry Leak Response Guidance API and ASME have issued several documents, discussed here, that provide guidance on leak response in refineries and chemical plants. 5.4.1 API RP 574: Inspection Practices for Piping System Components As specified in Section 5.2.5 of this report, API RP 574 is a guidance document for piping inspectors to improve their skills and practices. The CSB found that this document gives the most specific guidance on how to safely respond to leaks in refineries and chemical plants. Section 9.3, Investigation of Leaks, provides the following information: On-stream piping leaks in process units can occur for various reasons. Those who investigate the leak may be particularly at risk to the consequence associated with release of the process fluid. A site may want to create a general safety procedure to be followed during a piping leak investigation. A further precaution is to hold a safety review before any leak investigation. The review would consider the state of a piping system in terms of pressure, temperature, remaining inventory of process fluids, potential damage mechanisms and similar factors. The safety review team should define: a) a “hot zone” around the leak site, and establish PPE and additional firefighting equipment requirements to perform work inside this zone; b) decontamination requirements upon exit from the hot zone and other requirements necessary to protect personnel and the environment 185 API RP 574 even cautions the reader about potential consequence escalation: “The safety review team must be careful making assumptions about the leak’s cause. Incidents have occurred where investigative

185 API RP 574: Inspection Practices for Piping System Components, 3rd ed., Section 9.3, 2009.

Chevron Richmond Refinery Investigation Report January 2015 101 U.S. CHEMICAL SAFETY AND HAZARD INVESTIGATION BOARD

personnel assume they knew the cause of a small leak on an operating line and were caught unprepared when the leak suddenly became quite large.”186 Despite its positive aspects, API RP 574 should be improved to require facilities to develop a site-specific leak response protocol to be followed when a process fluid leak is discovered to help prevent and control future pipe leak incidents. For instance, users, such as Chevron, are not required to follow any of the guidance issued in Section 9.3, Investigation of Leaks. Permissive language informing users that they “may want to create” a safety procedure, or that a safety review “would consider” certain damage mechanisms requires no action by the operating companies. In addition, API RP 574:  Does not recommend limitation of site access around the leak to essential personnel only;  Does not specify employee job functions or leak analysis roles that should be established prior to performing the safety review of the leak (e.g., inspection staff, process engineers, metallurgical or mechanical engineers, operators, emergency responders);  Does not recommend evaluation of whether the leaking process fluid is near its autoignition temperature;  Does not recommend the determination of whether the leak is toxic; and  Does not recommend the user to evaluate the worst-case leak scenario. In addition, API RP 574 does not recommend the leaking piping circuit to be isolated—or recommend unit shutdown if the piping cannot be isolated—if leak response personnel cannot prove it is safe to continue operating the leaking line. Specifically, API RP 574 does not recommend piping isolation or unit shutdown if:  The leak poses immediate danger to safety, health, or the environment; or  The leak cannot be safely isolated or mitigated while the piping circuit is in operation. 5.4.2 API RP 2001: Fire Protection in Refineries API RP 2001: Fire Protection in Refineries “provide[s] a better understanding of refinery fire protection and the steps needed to promote safe storage, handling, and processing of petroleum and petroleum products in refineries. A basic principle of this standard is that fire prevention provides the fundamental foundation for fire protection.”187 This document also “examines fire protection concepts that should be covered in operating and maintenance practices and procedures ….”188

186 API RP 574: Inspection Practices for Piping System Components, 3rd ed., Section 9.3, 2009. 187 API RP 2001: Fire Protection in Refineries, 9th edition, Section 1.1, 2012. 188 Ibid., Section 1.2.

Chevron Richmond Refinery Investigation Report January 2015 102 U.S. CHEMICAL SAFETY AND HAZARD INVESTIGATION BOARD

Like API RP 574, API RP 2001 gives guidance to users on techniques for responding to process fluid leaks. Section 7.4, Loss of Containment, gives users guidance for both liquid leaks (Section 7.4.2) and gas leaks (Section 7.4.3). Interestingly, in areas where API RP 574 is lacking, API RP 2001 fills in some of the gaps. API RP 2001 suggests that response to control a leak should consider: a) Protection of personnel against exposure, b) Utilization of emergency response personnel and resources, c) Isolation of the fuel release or leak at the upstream source, d) Isolation of transfer medium, e) Isolation of ignition sources, f) Containment of product, g) Downwind and off-site impact, h) Displacement and/or removal of liquids still at risk, i) Reduction of hazard zone via application of firefighting foam for vapor suppression, and j) Development of mitigation cleanup strategies.189 Like API RP 574, API RP 2001 does not require users to follow its good practice guidance. Rather, it uses language like “Considerations… should include,” requiring no effective action by the operating companies to develop their own site-specific leak response protocol. Furthermore, API RP 2001 does not provide sufficient guidance on other safety critical leak response actions. It does not recommend:  Conducting a pre-response meeting with knowledgeable personnel to analyze the pressure, temperature, remaining inventory of process fluids, or potential damage mechanisms in the piping or equipment;  Limiting site access around the leak to essential personnel only;  Evaluating whether the leaking process fluid is near its autoignition temperature;  Determining whether the leak is toxic; and  Determining the worst-case leak scenario.

189 API RP 2001: Fire Protection in Refineries, 9th ed., Section 7.4.1, 2012.

Chevron Richmond Refinery Investigation Report January 2015 103 U.S. CHEMICAL SAFETY AND HAZARD INVESTIGATION BOARD

  1. 4.3 API 570: Piping Inspection Code: In-Service Inspection, Rating, Repair, and

Alteration of Piping Systems API 570: Piping Inspection Code: In-Service Inspection, Rating, Repair, and Alteration of Piping Systems specifies practices that must be performed regarding inspection, rating, repair, and alteration of metallic- and fiberglass-reinforced plastic piping systems.190 In Section 8, Repairs, Alterations, and Rerating of Piping Systems, the code specifies requirements when performing on-stream piping repairs, such as weld repairs, installing a clamp, or wrapping the piping. However, API 570 does not require safety evaluation of the leak—nor does it refer to any document that outlines the necessary safety precautions and evaluations—before attempting on-stream repairs. To better align the API standards that address leak repair and leak response, API 570 should require users to follow the process leak response safety requirements established in other standards. 5.4.4 ASME PCC-2-2011: Repair of Pressure Equipment and Piping ASME PCC-2-2011: Repair of Pressure Equipment and Piping is a standard that “provides methods for repair of equipment and piping within the scope of ASME Pressure Technology Codes and Standards after they have been placed in service.”191 It gives requirements for installing leak mitigation devices, such as clamps, which Chevron personnel considered installing on the 4-sidecut leak location before the pipe rupture. While the standard does discuss safety requirements before installing a clamp, they are vague and are lacking needed safety preventative measures. The safety requirements discussed in Article 3.6, Mechanical Clamp Repair state: Personnel shall be aware of hazards in installing clamps on degraded components, and shall take the necessary precautions to avoid unacceptable risks. A risk review shall be conducted before a clamp is installed. Personnel shall take any necessary precautions to avoid unacceptable risks. […] If the component is leaking or has the potential to leak during installation, and if the contents are hazardous, additional precautions should be taken and those precautions should be addressed during the pre-job hazard review meeting (e.g., need for fresh air suit, etc.).192 Article 2.4, Welded Leak Box Repair, gives similar safety guidance.193 This article goes on to state, “If the component is leaking prior to repair, consideration should be given to stopping the leak prior to welding the leak box.”194 Article 4.1, Nonmetallic Composite Repair Systems: High-Risk Applications, states the requirements for repairing leaks, or repairing piping and vessels that have defects from internal corrosion, among other

190 API 570: Piping Inspection Code: In-Service Inspection, Rating, Repair, and Alteration of Piping Systems, 3rd ed., Section 1.1.1, 2009. 191 ASME PCC-2-2011. Repair of Pressure Equipment and Piping, Section 1. 2011. 192 Ibid., Article 3.6. Sections 2.4 and 2.5. 193 Ibid., Article 2.4, Section 2.4. 194 Ibid., Article 2.4, Section 4.5.

Chevron Richmond Refinery Investigation Report January 2015 104 U.S. CHEMICAL SAFETY AND HAZARD INVESTIGATION BOARD

applications.195 It requires users to perform “an assessment of the risks associated with the defect and repair method.” It requires users before installation to consider: (1) Assessment of the nature and location of the defects (2) Design and operating conditions for the component and contents (including pressure, temperature, sizes, and combinations thereof) (5) Hazards associated with system service (9) Failure modes 196 While ASME PCC-2-2011 does describe general safety precaution requirements, they are not detailed enough to provide much value. Referencing other standards and recommended practices that give guidance on leak mitigation and response would add significant value to the user. 5.4.5 Industry Leak Response Guidance Conclusions Many industry standards, recommended practices, and guidance documents exist to aid refining and petrochemical personnel and facility management in industrial leak response. However, the documents are inconsistent, and none of them provide overall, comprehensive guidance or requirements for operations personnel and facility management to safely respond to hazardous process fluid leaks. The CSB found that existing API guidance language could be strengthened to control and prevent major process fluid releases and to ensure the safety of facility personnel. 5.5 Chevron Richmond Refinery Safety Culture The CSB found that weaknesses in the Chevron Richmond Refinery safety culture contributed to the August 6, 2012, pipe rupture. The CSB’s investigation report on the March 23, 2005, BP Texas City refinery incident presents the following definitions of the concept of safety culture: The U.K. Health and Safety Executive describes safety culture as “the product of individual and group values, attitudes, competencies and patterns of behaviour that determine the commitment to, and the style and proficiency of, an organization’s health and safety programs” (HSE, 2002). The CCPS cites a similar definition of process safety culture as the “combination of group values and behaviors that determines the manner in which process safety is managed” (CCPS, 2007, citing Jones, 2001). Well-known safety culture authors James Reason and Andrew Hopkins suggest that safety culture is defined by collective practices, arguing that this is a more useful definition because it suggests a practical way to create cultural change. More succinctly, safely culture can be defined as “the way we do things around here” (CCPS, 2007; Hopkins, 2005). An organization’s safety culture can be influenced by management changes, historical events, and economic pressures.

195 ASME PCC-2-2011. Repair of Pressure Equipment and Piping, Article 4.1, Section 1.2, 2011. 196 Ibid., Article 4.1, Section 1.3.

Chevron Richmond Refinery Investigation Report January 2015 105 U.S. CHEMICAL SAFETY AND HAZARD INVESTIGATION BOARD

Expanding on the above definitions, which are often applied to the petrochemical industry, the nuclear industry has developed definitions of safety culture that can be applied to all industrial sectors. The U.S. Nuclear Regulatory Commission (NRC) defines safety culture as “the core values and behaviors resulting from a collective commitment by leaders and individuals to emphasize safety over competing goals to ensure protection of people and the environment.”197 The Institute of Nuclear Power Operations (INPO), a nuclear power industry group, further expands upon this definition:

Nuclear safety is a collective responsibility. The concept of nuclear safety culture applies to every employee in the nuclear organization, from the board of directors to the individual contributor. No one in the organization is exempt from the obligation to ensure safety first.198

Discussed in the following sections are several aspects of safety culture at the Chevron Richmond Refinery that the CSB found contributed to the occurrence of the August 6, 2012, incident. 5.5.1 Normalization of Deviance “Normalization of deviance” is the acceptance of events that are not supposed to happen.199 Objective, outside observers see a situation as deviant, while people inside the situation see it as normal and acceptable.200 The August 6, 2012, pipe leak and subsequent response, as well as a previous incident in 2010, demonstrate efforts by Chevron employees to try to keep a unit operating during a hazardous leak, suggesting a culture at the Chevron Richmond Refinery that normalized this behavior. During response activities on August 6, 2012, Chevron firefighters performed physical actions that placed them in hazardous conditions by removing insulation on the high-temperature 4-sidecut piping while it was leaking flammable hydrocarbon process fluid. Even when hydrocarbon vapor visibly emerged from the pipe and a flash fire occurred during insulation removal attempts, the group decided to continue efforts to remove insulation from the on-stream pipe. This activity was acceptable to the individuals making the leak response decisions on the evening of the incident. A similar incident occurred before the 2012 incident. In April 2010, a pipe was found to be leaking on a high-temperature jet fuel pipe in the hydroprocessing unit at the Chevron Richmond Refinery. The operations staff reported the leak to management. However, no timely action was taken to repair the leak or shut down the unit. Unit operators expressed serious safety concerns with keeping the unit online with an active hazardous process leak. Nevertheless, the pipe remained in operation, still leaking, until the

197 Nuclear Regulatory Commission Final Safety Culture Policy Statement, 76 Fed. Reg. 34773 (June 14, 2011). 198 Institute of Nuclear Power Operations. Traits of a Healthy Nuclear Safety Culture. INPO 12-012. December 2012. 199 Vaughan, Diane, The Challenger Launch Decision: Risky Technology, Culture, and Deviance at NASA, University of Chicago Press, 1996. 200 Interview: Diane Vaughan, Consulting Newsline, May, 2008. See http://www.consultingnewsline.com/Info/Vie du Conseil/Le Consultant du mois/Diane Vaughan (English).html (accessed July 20, 2014).

Chevron Richmond Refinery Investigation Report January 2015 106 U.S. CHEMICAL SAFETY AND HAZARD INVESTIGATION BOARD

leak significantly worsened two days later. The unit was then shut down, and the leak was repaired. Both the April 2010 and August 2012 incidents are examples of decision making that encouraged and tolerated continued operation of a unit despite the presence of hazardous leaks in the Chevron Richmond Refinery. 5.5.2 Chevron Richmond Refinery Safety Culture Surveys The Chevron Richmond Refinery facilitated safety culture surveys of its staff.201 The surveys were designed as tools “by which the [Chevron Richmond Refinery] personnel’s perceptions about safety are revealed, explored, and developed.” One company conducted the safety culture surveys of Chevron Richmond staff in 2008 and 2010,202 providing the opportunity to identify any areas in which workers’ perceptions changed significantly and areas the Chevron Richmond Refinery may need to improve. The employees’ responses were divided into five groups based upon job categories: Operators and Mechanics, First Line Supervisors, Second Line Supervisors, Managers and Engineers, and “Other.” The number of employees surveyed and the job functions of the respondents are shown in Table 2. Refinery Job Position 2008 Survey Number of Respondents 2010 Survey Number of Respondents Operator 208 163 Mechanic 181 202 First Line Supervisor 53 103 Second Line Supervisor 47 66 Manager 18 46 Engineer 29 93 Other 125 263 Total Respondents 661 936 Table 2. Total number of employees surveyed and job functions of respondents in 2008 and 2010 Chevron Richmond Refinery staff safety culture surveys. Two types of comparison data were collected during these surveys. First, for each topic in the survey, the employees selected a statement supplied in one of four categories, in order of improving safety culture, to indicate their perception of the culture within the refinery. In the tables in the following sections, these selections are labeled “Current Conditions.” The change in employee perception of safety culture can be determined by examining the change in these answers from 2008 to 2010. The second type of data compared the employees’ view of the current environment at the refinery, or “Current Conditions,” with how they think things should be at the refinery, or “Hoped-for Conditions.” Comparing answers in the “Current Conditions” with the “Hoped-for Conditions” provides insight into the gaps in safety culture as seen by the employees.

201 Safety culture assessments are required by the City of Richmond RISO (See Section 5.5.2.4). However, the Chevron Richmond Refinery performed these surveys before they were a regulatory requirement. Safety Culture Assessments were not required by the RISO on August 6, 2012. The City of Richmond adopted this requirement in February 2013. See http://www.ci.richmond.ca.us/ArchiveCenter/ViewFile/Item/4988 (accessed December 21, 2014). 202 A safety culture survey was also performed in 2009, showing similar results to the 2008 and 2010 surveys. However, the company conducting the safety culture survey did not include the 2009 results in its 2008 and 2010 comparisons.

Chevron Richmond Refinery Investigation Report January 2015 107 U.S. CHEMICAL SAFETY AND HAZARD INVESTIGATION BOARD

Below is an analysis of three survey topics from the 2008 and 2010 safety culture surveys at the Chevron Richmond Refinery which evaluate two key safety culture characteristics having direct impact on an incident like the August 6, 2012, 4-sidecut piping failure: stop work authority and equipment maintenance. The CSB performed a statistical analysis of the results using a Chi-Square test.203 The information presented in the following section shows statistically significant changes in responses. 5.5.2.1 Stop Work Authority Safety Culture Survey Responses Both the 2008 and 2010 surveys polled workers on their perception of their own Stop Work Authority. The 2008 survey found that while 95 percent of operators and mechanics indicated that they desired to use their Stop Work Authority at any time they witnessed unsafe activity, only 68 percent said they would do so (Table 3). The analysis of this discrepancy concludes this “may imply a perceived barrier” to using one’s Stop Work Authority.

Question: Stopping Unsafe Work I would rarely, if ever do this. I would ask the safety person to do it. I do this with my own team. I do this with anyone and anytime there is unsafe activity. Operators & Mechanics 2008 Current Conditions 7% (27 responses) 6% (23 responses) 19% (74 responses) 68% (265 responses) Operators & Mechanics 2008 Hoped-for Conditions 0% 3% (12 responses) 2% (8 responses) 95% (369 responses) Table 3. Chevron Richmond Refinery 2008 Safety Culture Survey responses to question of “Stopping Unsafe Work” by operators and mechanics. Chevron Richmond Refinery 2008 process safety culture survey identified discrepancy between operators’ and mechanics’ desire and personnel willingness to use Stop Work Authority. A total of 389 operators and mechanics were polled for this survey.

Between 2008 and 2010, there also was a decrease in Chevron Richmond Refinery employees’ willingness to use their Stop Work Authority beyond their own work group. In 2010, a statistically significant portion of managers and engineers reported that they were less willing to use their Stop Work Authority at any time they witnessed unsafe activity (Table 4).

203 The Chi-Square test permits the determination of whether a significant difference exists between two sets of categorical data, an "observed" set and an "expected" set. It permits an answer to the question, "How well does our observed distribution fit the hypothetical distribution?"

Chevron Richmond Refinery Investigation Report January 2015 108 U.S. CHEMICAL SAFETY AND HAZARD INVESTIGATION BOARD

Question: Stopping Unsafe Work I would rarely, if ever do this. I would ask the safety person to do it. I do this with my own team. I do this with anyone and anytime there is unsafe activity. Managers & Engineers 2008 Current Conditions 6% (3 responses) 2% (1 response) 15% (7 responses) 77% (36 responses) Managers & Engineers 2010 Current Conditions 6% (8 responses) 4% (6 responses) 26% (36 responses) 64% (89 responses) Table 4. Chevron Richmond Refinery 2008 and 2010 Safety Culture Survey responses to question of “Stopping Unsafe Work” by managers and engineers. Between 2008 and 2010, a significant portion of managers and engineers became less willing to use their Stop Work Authority at any time. In 2008, the survey polled 47 managers and engineers. In 2010, the survey polled 139 managers and engineers. A similar question was then asked about how the refinery as a whole perceives Stop Work Authority. Between 2008 and 2010, a statistically significant, increased portion of operators and mechanics began to feel that they could get in trouble when using their Stop Work Authority (Table 5). These trends could explain why no individuals used their Stop Work Authority on the day of the incident despite some participants reporting in interviews with the CSB that they were not comfortable with the hazardous work activity taking place.

Question: How do people feel about stopping unsafe work? It could get you in trouble. It’s probably best to point it out to a supervisor first. They do it and know it might slow down the job. They will do it and know they will be backed up. Operators & Mechanics 2008 Current Conditions 7% (27 responses) 26% (101 responses) 25% (97 responses) 42% (164 responses) Operators & Mechanics 2010 Current Conditions 12% (44 responses) 24% (88 responses) 25% (91 responses) 39% (142 responses) Table 5. Chevron Richmond Refinery 2008 and 2010 Safety Culture Survey responses to question of “How do people feel about stopping unsafe work?” by operators and mechanics. Between 2008 and 2010, a significant portion of operators and mechanics began to feel they could get in trouble when using their Stop Work Authority. In 2008, the survey polled 389 operators and mechanics. In 2010, the survey polled 365 operators and mechanics. 5.5.2.2 Mechanical Integrity Safety Culture Survey Responses The 2008 and 2010 surveys polled Chevron Richmond Refinery employees on their perception of how equipment is maintained at the refinery. Table 6 summarizes the responses to this survey question.

Chevron Richmond Refinery Investigation Report January 2015 109 U.S. CHEMICAL SAFETY AND HAZARD INVESTIGATION BOARD

Question: How do we take care of equipment? Equipment is not cared for, and we often have breakdowns and near misses. We have procedures for updating and maintaining our equipment but they are not always followed. We use procedures for updating and maintaining our equipment but they are not always up to date. We work hard to think about what can go wrong, and fix the equipment before it causes harm. All Employees 2008 Current Conditions 8% (53 responses) 26% (172 responses) 35% (231 responses) 31% (205 responses) All Employees 2008 Hoped-for Conditions 1% (7 responses) 5% (33 responses) 8% (53 responses) 86% (568 responses) All Employees 2010 Current Conditions 12% (112 responses) 27% (253 responses) 30% (281 responses) 31% (290 responses) All Employees 2010 Hoped-for Conditions 2% (19 responses) 4% (37 responses) 9% (84 responses) 85% (796 responses) Table 6. Chevron Richmond Refinery 2008 and 2010 Safety Culture Survey responses to the question: “How do we take care of equipment?” Both surveys revealed that most employees felt procedures to maintain equipment were not always up to date, were not always followed, or that equipment was not properly maintained despite most individuals’ desire that the refinery fix equipment before it causes harm. Between the 2008 and 2010 surveys, a statistically significant portion of operators and mechanics began to feel that equipment was not cared for at the refinery. In addition, a statistically significant number of managers and engineers expressed that procedures for updating and maintaining equipment were not always followed. These results indicate that Chevron Richmond Refinery employees identified increased weakness in their mechanical integrity programs, which could result in equipment failures, such as the incident on August 6, 2012. 5.5.2.3 Process Safety Analysis Safety Culture Survey Responses The 2008 and 2010 surveys tasked Chevron Richmond Refinery employees to provide feedback on how process safety failures are investigated at the refinery. The survey results are shown in Table 7.

Question: Process Safety Issues Are… …usually not investigated. …investigated but not always resolved. …investigated and resolved if it’s in the budget. …routinely investigated, resolved and the lessons learned are shared with others. All Employees 2008 Current Conditions 2% (13 responses) 24% (159 responses) 21% (139 responses) 53% (350 responses) All Employees 2008 Hoped-for Conditions 1% (6 responses) 1% (7 responses) 3% (20 responses) 95% (628 responses) All Employees 2010 Current Conditions 3% (28 responses) 26% (243 responses) 17% (159 responses) 54% (506 responses) All Employees 2010 Hoped-for Conditions 2% (19 responses) 1% (9 responses) 4% (37 responses) 93% (871 responses) Table 7. Chevron Richmond Refinery 2008 and 2010 Safety Culture Survey responses to the question “Process Safety Issues Are…” Responses indicate employees desire process safety issues are investigated more thoroughly.

Chevron Richmond Refinery Investigation Report January 2015 110 U.S. CHEMICAL SAFETY AND HAZARD INVESTIGATION BOARD

The survey responses show a discrepancy between the “Current Conditions” and “Hoped-for Conditions.” While nearly all of the employees polled desired that process safety issues were “routinely investigated, resolved and the lessons learned [were] shared with others”, only about half of the employees reported that they believed the refinery achieved that goal. The safety culture survey analysis of this difference concluded, “There continues to be a very strong desire to investigate more thoroughly to ensure there is adequate learning.” 5.5.2.4 Regulator Overview of Safety Culture Survey Action Items Contra Costa County issues regulations to covered facilities within the county through its Industrial Safety Ordinance (ISO).204 Although the City of Richmond is located in Contra Costa County, the county does not have jurisdiction over industrial facilities located within city limits. Thus, the ISO is not enforceable within the City of Richmond. On December 18, 2001, the City of Richmond adopted its own industrial safety ordinance (RISO), based on the ISO, to extend jurisdiction of a similar sort over facilities located in the city. The RISO covers two facilities—one of which is the Chevron Richmond Refinery. Pursuant to an agreement between the two parties, Contra Costa County inspects these two facilities and implements the RISO for the City of Richmond. Both the Contra Costa County ISO and the City of Richmond RISO require covered facilities to perform safety culture assessments at least once every five years.205 In addition, Contra Costa County published an “Industrial Safety Ordinance Guidance Document” that establishes additional requirements covered facilities must perform. Section F: Safety Culture Assessments requires facilities to maintain the following records, which can be audited by the regulator: a. Safety Culture Assessment reports; b. Stated facility goals and objectives regarding safety culture and related topics; c. Documentation of the appropriateness of the participation level targeted and achieved; d. Assessment methodologies used for each work group and criteria for successful implementation; e. Criteria used for rejection of any results or findings; f. Criteria used for determining if no action(s) will be taken on assessment results or recommendations; g. Summary of the assessment components with key findings; h. Improvement plan with clear list of action items and identifiable milestones; i. Rationale for prioritizing action items and justification for the action items;

204 For more information on the Contra Costa County Industrial Safety Ordinance, and the City of Richmond Industrial Safety Ordinance, see the CSB’s draft Regulatory Report, http://www.csb.gov/chevron-refinery-fire/ (accessed September 9, 2014). 205 The Contra Costa County ISO has required covered facilities to perform Safety Culture Assessments at least every five years since 2006, but Richmond did not adopt these requirements until February 2013. See http://www.ci.richmond.ca.us/documentcenter/view/26375, page 22 (accessed July 11, 2014) and http://www.ci.richmond.ca.us/ArchiveCenter/ViewFile/Item/4988 (accessed December 21, 2014).

Chevron Richmond Refinery Investigation Report January 2015 111 U.S. CHEMICAL SAFETY AND HAZARD INVESTIGATION BOARD

j. Documentation of communications to workforce; and k. Qualitative and quantitative comparisons in subsequent assessments of whether improvement plans affected observable safety behavior, or culture.206 As items (h) and (k) show, Contra Costa County and the City of Richmond require facilities to develop an improvement plan based on the safety culture assessment findings. The facilities must also monitor whether the improvement plan results in observable changes to safety behavior and culture. These items set a requirement for facilities to strive for continuous improvement in process safety culture. However, no means are in place for the regulator to ensure that the action items are of sufficient quality to promote cultural change. As is currently written in the Contra Costa County guidance document, the regulator only requires facilities to develop action items following the conduct of safety culture assessments. The quality of these action items can be subpar, lacking in capability to significantly change culture, yet the regulator must still approve them in its document-verification audits. In the years leading to the August 6, 2012 incident, the Chevron Richmond Refinery identified weaknesses in its Stop Work Authority program due to employees’ hesitation to use their Stop Work Authority when they witnessed an unsafe act occurring. The refinery also identified a deteriorating employee perception of the mechanical integrity programs used at the refinery. However, the Chevron Richmond Refinery was not required to take quality, constructive steps to improve these areas.207 Had steps been taken prior to the incident to find ways to encourage employees to use their Stop Work Authority or to determine why the refinery’s mechanical integrity programs were seen as deficient, the August 6, 2012, pipe rupture might have been prevented. Contra Costa County and the City of Richmond should enhance the ISO and RISO, respectively, to require the development of an oversight committee to monitor the development and implementation of action items created as a result of safety culture assessment findings. This committee should also assess whether the action items that result from the safety culture assessments have the potential to effectively lead to improved process safety culture in the facility. This oversight committee should be comprised of regulator representatives, company representatives, and members of the workforce and their representatives. Many citizens of Contra Costa County and Richmond, California, are concerned about the environmental impacts of industrial process incidents on their community, so they passionately advocate for improved industrial process safety at the petrochemical facilities in the county. For this reason, it is important that Contra Costa County community members play an active role in overseeing and providing input into process safety culture improvement efforts at petrochemical facilities in Contra Costa and Richmond. Ideally, one to two community members—who are selected by their peers based upon their ability to effectively (1) communicate the concerns of community members and (2) provide valuable input into the process safety culture improvement plans—will also be member(s) of this oversight committee.

206 http://cchealth.org/hazmat/pdf/iso/section_f.pdf (accessed July 14, 2014). 207 Under the RISO, Chevron was not required to conduct safety culture assessments until February 2013.

Chevron Richmond Refinery Investigation Report January 2015 112 U.S. CHEMICAL SAFETY AND HAZARD INVESTIGATION BOARD

  1. 0 Recommendations

Under the authority of 42 U.S.C. §7412(r)(6)(C)(i) and (ii), and in the interest of promoting safer operations at petroleum refineries and protecting workers and communities from future accidents nationwide, the CSB makes the following safety recommendations: 6.1 American Petroleum Institute 2012-03-I-CA-R26 Revise API RP 939-C: Guidelines for Avoiding Sulfidation (Sulfidic) Corrosion Failures in Oil Refineries to establish minimum requirements for preventing catastrophic rupture of low-silicon carbon steel piping. At a minimum: a. Require users to identify carbon steel piping circuits susceptible to sulfidation corrosion that may contain low-silicon components. These circuits have the potential to contain carbon steel components that were not manufactured to the American Society for Testing and Materials (ASTM) A106 specification and may contain less than 0.10 weight percent silicon content. b. For piping circuits identified to meet the specifications detailed in 2012-03-I-CA-R26(a), require users to either (1) enact a program to inspect every component within the piping circuit once, known as 100 percent component inspection (per the requirements established pursuant to recommendation 2012-03-I-CA-28(c)), or (2) replace the identified at-risk carbon steel piping with a steel alloy that is more resistant to sulfidation corrosion. c. If low-silicon components or components with accelerated corrosion are identified in a carbon steel piping circuit meeting the specifications detailed in 2012-03-I-CA-R26(a), require designation of these components as permanent Condition Monitoring Locations (CMLs) until the piping components are replaced.  2012-03-I-CA-R27 Revise API RP 571: Damage Mechanisms Affecting Fixed Equipment in the Refining Industry to: a. Describe the potential for increased rates of sulfidation corrosion occurring in low-silicon carbon steel in Section 4.4.2.3 Critical Factors;   b. Specify that sulfidation corrosion rates in carbon steel piping can be significantly faster in a few, individual piping components in section 4.4.2.5 Appearance or Morphology of Damage; and c. Refer the reader to the 100 percent component inspection or pipe replacement requirements detailed in API RP 939-C: Guidelines for Avoiding Sulfidation (Sulfidic) Corrosion Failures in Oil Refineries (pursuant to recommendation 2012-03-I-CA-26) and API 570: Piping Inspection Code: In-service Inspection, Rating, Repair, and Alteration of Piping Systems (pursuant to

Chevron Richmond Refinery Investigation Report January 2015 113 U.S. CHEMICAL SAFETY AND HAZARD INVESTIGATION BOARD

2012-03-I-CA-28(c)) for carbon steel piping circuits susceptible to sulfidation corrosion that may contain low-silicon components. 2012-03-I-CA-R28

Revise API 570: Piping Inspection Code: In-service Inspection, Rating, Repair, and Alteration of Piping Systems to:

a. Use terminology consistent with API RP 939-C: Guidelines for Avoiding Sulfidation (Sulfidic) Corrosion Failures in Oil Refineries and other API standards and recommended practices discussed in this report. Replace the terminology “high-temperature sulfur corrosion” with “sulfidation corrosion”; b. Specify that sulfidation corrosion rates in carbon steel piping can be significantly faster in some individual piping components than in others; c. Establish a new section that details inspection requirements to identify low-silicon piping components in carbon steel circuits susceptible to sulfidation corrosion. This section shall require users to identify carbon steel piping circuits at risk to contain low-silicon components by following the requirements detailed in API RP 939-C: Guidelines for Avoiding Sulfidation (Sulfidic) Corrosion Failures in Oil Refineries (pursuant to 2012-03-I-CA-26(a)) and API RP 578: Material Verification Program for New and Existing Alloy Piping Systems (pursuant to 2012-03-I-CA-29). At a minimum, require users to either: i. Inspect every component within all carbon steel piping circuits susceptible to sulfidation corrosion that may contain low-silicon components once. The purpose of this practice is to identify any low-silicon components that are corroding at accelerated rates. Inspection may be performed through ultrasonic thickness measurements to establish corrosion rates for each component, destructive laboratory analysis, or other methods. Following the inspection, require users to follow the low-silicon corrosion rate monitoring requirements established in 2012-03-I-CA-R26(c); or ii. Replace the identified at-risk carbon steel piping with a steel alloy that is more resistant to sulfidation corrosion.

d. Incorporate as a “normative reference” API RP 939-C: Guidelines for Avoiding Sulfidation (Sulfidic) Corrosion Failures in Oil Refineries; and e. Require users to follow the minimum leak response guidance established in API RP 2001: Fire Protection in Refineries, developed in response to recommendation 2012-03-I-CA-R31.

Chevron Richmond Refinery Investigation Report January 2015 114 U.S. CHEMICAL SAFETY AND HAZARD INVESTIGATION BOARD

2012-03-I-CA-R29 Revise API RP 578: Material Verification Program for New and Existing Alloy Piping Systems, to require users to establish and implement a program to identify carbon steel piping circuits that are susceptible to sulfidation corrosion and may contain low-silicon components. These circuits have the potential to contain carbon steel components that were not manufactured to the American Society for Testing and Materials (ASTM) A106 specification and may contain less than 0.10 weight percent silicon content. Refer the reader to the 100 percent component inspection or pipe replacement requirements detailed in API RP 939-C: Guidelines for Avoiding Sulfidation (Sulfidic) Corrosion Failures in Oil Refineries (pursuant to recommendation 2012-03-I-CA-26(b)) and API 570: Piping Inspection Code: In-service Inspection, Rating, Repair, and Alteration of Piping Systems (pursuant to 2012-03-I-CA-28(c)) for carbon steel piping circuits susceptible to sulfidation corrosion that may contain low-silicon components. 2012-03-I-CA-R30

Revise API RP 574: Inspection Practices for Piping System Components (3rd edition) to: a. Incorporate as a normative reference API RP 939-C: Guidelines for Avoiding Sulfidation (Sulfidic) Corrosion Failures in Oil Refineries; b. Reference API RP 939-C: Guidelines for Avoiding Sulfidation (Sulfidic) Corrosion Failures in Oil Refineries when discussing that nonsilicon-killed carbon steel is susceptible to sulfidation corrosion; and c. In Section 9.3 Investigation of Leaks, require users to follow the leak response protocol requirements established in API RP 2001: Fire Protection in Refineries (pursuant to 2012-03-I- CA-R31). 2012-03-I-CA-R31 Revise API RP 2001: Fire Protection in Refineries to require users to develop a process fluid leak response protocol specific to their own facility that must be followed when a process fluid leak is discovered. Recommend users to incorporate the following actions into their leak response protocol: a. Establish an Incident Command structure upon identification of a process fluid leak; b. Conduct a pre-response meeting with personnel with specific technical expertise (e.g., inspectors, operators, metallurgists, engineers, and management) and the Incident Commander to determine pressure, temperature, remaining inventory of process fluids, potential damage mechanisms that caused the leak, and worst-case leak scenario;

Chevron Richmond Refinery Investigation Report January 2015 115 U.S. CHEMICAL SAFETY AND HAZARD INVESTIGATION BOARD

c. Establish a hot zone that identifies the area of risk of exposure or injuries due to flame contact, radiant heat, or contact to hazardous materials, taking into consideration the worst-case leak scenario; d. Limit site access around leak location to essential personnel only; e. Isolate the leaking piping or vessel, or if isolation is not possible, shutdown of the unit when the leaking process fluid poses immediate danger to safety, health, or the environment—such as piping fluid that is toxic or near the autoignition temperature. 6.2 American Society of Mechanical Engineers 2012-03-I-CA-R32

Revise ASME PCC-2-2011: Repair of Pressure Equipment and Piping to require users to follow the minimum process fluid leak response requirements established in API RP 2001: Fire Protection in Refineries, developed in response to recommendation 2012-03-I-CA-R31, before conducting process fluid leak repair. 6.3 Chevron USA 2012-03-I-CA-R33 Develop a method to assign accountability at Chevron to determine whether any new Energy Technology Company (ETC) recommended program or industry best practice, such as API guidance must be followed to ensure process safety or employee personal safety. This method shall include monitoring of these practices and guidance at a refining system level and at the refinery level. Develop a tracking system to monitor the progress of implementing these selected practices and guidance to completion. 2012-03-I-CA-R34 Develop an auditable process to be available for all recommended turnaround work items necessary to address mechanical integrity deficiencies or inspection recommendations that are denied or deferred. This process shall provide the submitter of the denied or deferred recommendation with the option to seek further review by his or her manager, who can further elevate and discuss the recommendation with higher level management, such as the Area Business Unit Manager. Maintain an auditable log of each of these potential turnaround work items, including the ultimate determination of approval, deferral, or rejection, justification determination, and the person or team responsible for that decision. 2012-03-I-CA-R35 Develop an approval process that includes a technical review that must be implemented prior to resetting the minimum alert thickness to a lower value in the inspection database.

Chevron Richmond Refinery Investigation Report January 2015 116 U.S. CHEMICAL SAFETY AND HAZARD INVESTIGATION BOARD

  1. 4 Board of Supervisors, Contra Costa County, California

2012-03-I-CA-R36 Revise the Industrial Safety Ordinance (ISO) regulations for petroleum refineries to require a process safety culture continuous improvement program including a written procedure for periodic process safety culture surveys across the work force. Require an oversight committee comprised of the regulator, the company, the company’s workforce and their representatives, and community representatives. This oversight committee shall: a. Select an expert third party that will administer a periodic process safety culture survey; b. Review and comment on the third party expert report developed from the survey; c. Oversee the development and effective implementation of action items to effectively address identified process safety culture issues; and d. Develop process safety culture indicators to measure major accident prevention performance. The periodic process safety culture report shall be made available to the plant workforce. 6.5 Mayor and City Council, City of Richmond, California 2012-03-I-CA-R37 Revise the Richmond Industrial Safety Ordinance (RISO) regulations for petroleum refineries to require a process safety culture continuous improvement program including a written procedure for periodic process safety culture surveys across the work force. Require an oversight committee comprised of the regulator, the company, the company’s workforce and their representatives, and community representatives. This oversight committee shall: a. Select an expert third party that will administer a periodic process safety culture survey; b. Review and comment on the third party expert report developed from the survey; c. Oversee the development and effective implementation of action items to effectively address identified process safety culture issues; and d. Develop process safety culture indicators to measure major accident prevention performance. The periodic process safety culture report shall be made available to the plant workforce.

Appendix A

117 U.S. CHEMICAL SAFETY AND HAZARD INVESTIGATION BOARD

Appendix A—Chevron Leak Response Protocol Developed Post-incident

Appendix A

118 U.S. CHEMICAL SAFETY AND HAZARD INVESTIGATION BOARD

Appendix A

119 U.S. CHEMICAL SAFETY AND HAZARD INVESTIGATION BOARD

Appendix B

120 U.S. CHEMICAL SAFETY AND HAZARD INVESTIGATION BOARD

Appendix B—Contra Costa County Community Warning System Following the incident, Contra Costa County’s Community Warning System was used to notify the surrounding community of the hazardous material incident and order a shelter-in-place. But for many people, the warning came hours after the Chevron fire began. The Community Warning System uses sirens, the news media, and phone calls to residents to initiate the shelter-in-place. Contra Costa County issued the shelter-in-place advisory on August 6, 2012, at 6:38 p.m. for the cities of Richmond, San Pablo, and North Richmond, and lifted the shelter-in-place later that evening at 11:12 p.m. However, some phone calls notifying residents of the shelter-in-place advisory did not occur until over four hours after the release. This delay could have resulted in nearby residents unnecessarily and unknowingly being exposed to materials released to the atmosphere during the Chevron process leak and fire. Since the incident, Contra Costa County has made efforts to improve the Community Warning System. It has contracted with a new vendor that will automatically call Contra Costa County residents in an emergency.208

208 See http://concord-ca.patch.com/groups/politics-and-elections/p/contra-costa-county-testing-new-community- alert-system and http://www.contracosta.ca.gov/documentcenter/view/8161.

Appendix C

121 U.S. CHEMICAL SAFETY AND HAZARD INVESTIGATION BOARD

Appendix C—Usage of Clamps at Chevron Richmond Refinery The CSB committed to analyzing Chevron’s culture of using clamps to temporarily stop a process fluid leak in “Additional Issues Currently Under Investigation” in its Interim Investigation Report on the August 6, 2012, Chevron Richmond Refinery incident. Following the August 6, 2012 incident, Cal/OSHA issued a citation to Chevron for nine temporary nonwelding repairs that had not been removed at the most recent turnaround.209 The CSB analyzed this citation and all available evidence on clamp usage at the Chevron Richmond Refinery. The CSB could not take a conclusive stance on whether the refinery over-relied on temporary leak repair clamps in its mechanical integrity program based upon available evidence. In addition, the CSB did not find any direct or relevant linkage between the specific clamps for which the citations were issued and the incident. As a result, this report does not analyze the use of leak repair clamps at the Chevron Richmond Refinery.

209 Division of Occupational Safety and Health, Cal/OSHA Process Safety Management District Office. Citation and Notification of Penalty. Inspection Number 314332370; Citations Issued to Chevron U.S.A. Inc.; Issuance Date 01/30/2013. Citation 8 Item 1. See http://www.dir.ca.gov/dosh/citations/Chevron_314332370_cites_issued_1-30-13.pdf#zoom=100 (accessed November 5, 2014).

Chevron Richmond Refinery Investigation Report January 2015 122 U.S. CHEMICAL SAFETY AND HAZARD INVESTIGATION BOARD

FD06455 | 2012_美国_tesoro-anacortes-refinery-fatal-explosion-and-fire.pdf

分类:06_境外及港澳台调查报告 | 年份:2012 | 地域: | 严重程度: | 场所: | 起火原因: | 来源格式:pdf

Birring NDE Center, Inc. 515 Tristar Drive, Webster, TX 77598 Tel: (832) 533-8366 Fax: (281) 488-8485

September 5, 2012 Ultrasonic Inspection Report HTHA Inspection of Exchangers E 6600 E and E 6600 B

Introduction: Inspection for detection of High Temperature Hydrogen Attack (HTHA) was performed at selected locations of Exchangers E 6600 E and E 6600 B

Inspection Dates: August 31, 2012 Client:

US Chemical and Safety Board Location:

Cleveland, OH Contact:

Roger Evans Inspectors:

Anmol Birring, ASNT Level III

Technique: Ultrasonic inspection for detection of HTHA was conducted using the following techniques: Base Metal: Backscatter for initial scanning. Velocity-ratio for verification, if backscatter is positive

Scope: Base Metal backscatter ultrasonic data was taken at selected locations in Exchangers E 6600 E and E 6600 B. The locations were selected by Roger Evans. All locations were at least 9 inches away from the welds.

UT Equipment: Backscatter: USN Go in the RF mode

Velocity Ratio: Panametrics Pulser 5052 with the Tektronix 2012 oscilloscope

UT Transducers: Backscatter: 5 MHz, 10 mm dia Dual L-wave transducer. Velocity ratio: 5 MHz, 12.5 mm dia Single L and S-wave transducers

Calibration: Base metal calibration performed on step block and HTHA sample. The HTHA signal was set to 80 % FSH at 62 dB as shown in Figure 2. Testing was performed at a gain of 62 dB

Velocity ratio calibration was performed on a step block with no HTHA and a sample with HTHA. The readings are given in Table 1.

RESULTS Backscatter measurements were taken at eight selected areas on E 6600 E and about six areas on E 6600 B. Each of the areas is about 4 inches in diameter. Within each area, five backscatter measurements were taken.

Birring NDE Center, Inc. 515 Tristar Drive, Webster, TX 77598 Tel: (832) 533-8366 Fax: (281) 488-8485

Backscatter was detected at all points. An indication of backscatter can mean base metal HTHA or stringers in steel (inclusions in steel). To determine the cause of backscatter, follow up inspections were done to measure velocity-ratio. This was done on Exchanger E 6600 E and the results are given in Table 2. All of the velocity-ratio measurements turned out to be in the normal range, an indication that the backscatter was caused by stringers in steel.

No follow-up velocity ratio measurements were taken on E 6600 B

CONCLUSIONS No base metal HTHA was detected at the locations inspected in the exchanger shell. One has to note that all measurements were taken quite far from the weld HAZ.

Table 1. Calibration for Velocity Ratio. Step Block and sample with actual HTHA

Block Thickness Backscatter depth Ratio Step Block 19.0 mm 0 mm 0.546 HTHA 1 SK 21.5 mm 14 mm 0.560

Table 2. Ultrasonic Data taken on E 6600 E for detection of base metal HTHA.

No. Location Thickness Backscatter Vel Ratio Comments 1 E 01 22 mm Yes 0.546 No HTHA 2 E 02 22 mm Yes 0.543 No HTHA 3 E 03 22 mm Yes 0.546 No HTHA 4 E 04 21.6 mm Yes 0.545 No HTHA 5 E 05 21.7 mm Yes 0.546 No HTHA 6 E 06 21.6 mm Yes 0.547 No HTHA 7 E 07 29.8 mm Yes 0.539 No HTHA 8 EC 01* 22.5 mm Yes 0.546 No HTHA

Birring NDE Center, Inc. 515 Tristar Drive, Webster, TX 77598 Tel: (832) 533-8366 Fax: (281) 488-8485

Figure 2. HTHA Backscatter Calibration at 62 dB. Top-left – Step block with no HTHA. Top- right and bottom - Representative HTHA backscatter signals from HTHA 1 SK sample

FD06456 | 2013_CSB_2013_West_Fertilizer_Company_Fire_and_Explosion_Investigation_Report.pdf

分类:06_境外及港澳台调查报告 | 年份:2013 | 地域: | 严重程度: | 场所: | 起火原因: | 来源格式:pdf

U.S. CHEMICAL SAFETY AND HAZARD INVESTIGATION BOARD

INVESTIGATION REPORT

FINAL WEST FERTILIZER COMPANY FIRE AND EXPLOSION (15 Fatalities, More Than 260 Injured)

WEST FERTILIZER COMPANY WEST, TX KEY ISSUES: APRIL 17, 2013 • REGULATORY OVERSIGHT • HAZARD AWARENESS • EMERGENCY PLANNING AND RESPONSE • FERTILIZER GRADE AMMONIUM NITRATE STORAGE PRACTICES • LAND USE PLANNING AND ZONING REPORT 2013-02-I-TX

[This page intentionally left blank.]

West Fertilizer Company Final Report January 2016

Dedication This report is dedicated to the 12 emergency responders and 3 members of the public who lost their lives as a result of the explosion at the West Fertilizer Company on April 17, 2013.

Morris Bridges Perry Calvin Jerry Dane Chapman Cody Frank Dragoo Kenneth Harris Adolph Lander James Matus Judith Ann Monroe Joseph Pustejovsky Cyrus Adam Reed Mariano C. Saldivar Kevin William Sanders Douglas Snokhous Robert Snokhous William Uptmor, Jr.

West Fertilizer Company Final Report January 2016 1 U.S. CHEMICAL SAFETY AND HAZARD INVESTIGATION BOARD

Contents 1.0 EXECUTIVE SUMMARY ........................................................................................................... 13 1.1 Overview ........................................................................................................................................ 13 1.2 Federal and State Response ........................................................................................................... 14 1.2.1 Joint SFMO/ATF Investigation ........................................................................................ 14 1.2.2 CSB Response ................................................................................................................... 15 2.0 BACKGROUND ........................................................................................................................... 16 2.1 West Fertilizer Company ............................................................................................................... 16 2.1.1 Facility Operations Description ........................................................................................ 18 2.1.2 Facility Layout and Materials of Construction ................................................................. 23 2.1.3 Unloading of Fertilizer ...................................................................................................... 25 2.1.4 Housekeeping .................................................................................................................... 26 3.0 INCIDENT DESCRIPTION .......................................................................................................... 27 3.1 West Police Department ................................................................................................................ 27 3.2 West Volunteer Fire Department (WVFD) .................................................................................... 28 3.3 Abbott, Bruceville-Eddy, Mertens, and Navarro Mills Volunteer Fire Departments .................... 29 3.4 Consequences ................................................................................................................................. 30 3.4.1 Fatalities and Injuries ........................................................................................................ 30 3.4.2 Property Damage .............................................................................................................. 32 3.4.3 West Independent School District .................................................................................... 39 3.4.4 West Rest Haven Nursing Home ...................................................................................... 49 3.4.5 West Terrace Apartment Complex ................................................................................... 53 3.4.6 Private Residences ............................................................................................................ 54 3.4.7 Infrastructure Damage to the City of West ....................................................................... 55 4.0 INCIDENT ANALYSIS ................................................................................................................ 57 4.1 Fertilizer Grade Ammonium Nitrate (FGAN) ............................................................................... 57 4.1.1 The Fertilizer Industry ...................................................................................................... 57 4.1.2 FGAN Properties .............................................................................................................. 57 4.1.3 FGAN Hazards ................................................................................................................. 58 4.1.4 Previous Incidents Involving FGAN ................................................................................ 61 4.1.5 Historical Knowledge of FGAN Fire and Explosion Hazards .......................................... 62

West Fertilizer Company Final Report January 2016 2 U.S. CHEMICAL SAFETY AND HAZARD INVESTIGATION BOARD

  1. 2

Factors Contributing to the Massive Fire and Explosion at the WFC ........................................... 64 4.2.1 Contamination of the FGAN Pile ..................................................................................... 64 4.2.2 Heating and Ventilation .................................................................................................... 66 4.3 Detonation Scenarios ..................................................................................................................... 68 4.3.1 Scenario 1: Detonation from the Top of the FGAN Pile .................................................. 69 4.3.2 Scenario 2: Detonation in Heated FGAN Along Exterior Wall Exposed to Fire ............. 71 4.3.3 Scenario 3: Detonation in Elevator Pit That Spread to Main FGAN Bin ......................... 73 4.4 Forensic Testing of West Fertilizer Company Samples ................................................................. 73 4.5 Blast and Impact Analysis ............................................................................................................. 78 4.5.1 Seismic Data ..................................................................................................................... 81 5.0 COMMERCIAL PROPERTY AND LIABILITY INSURANCE ................................................. 82 5.1 Triangle Insurance Coverage and Audits (2006–2010) ................................................................. 83 5.1.1 Triangle Loss Control Surveys That Did Not Include FGAN Hazards ............................ 86 5.2 U.S. Fire Insurance Coverage and Audits (2010–2013) ................................................................ 86 5.3 Insurance Claims and Other Aid after the Explosion .................................................................... 87 5.4 FGAN Facilities in Texas and the Potential for Offsite Consequences ......................................... 88 5.5 Limits of Insurance Coverage in Texas ......................................................................................... 90 5.6 Insurance Services Office Rating ................................................................................................... 94 5.6.1 Impact of the City of West Class 5 ISO Rating on the West Fertilizer Company ............ 95 6.0 INHERENTLY SAFER TECHNOLOGY ..................................................................................... 97 6.1 Alternative Formulations of FGAN ............................................................................................... 99 6.2 Inherently Safe Building Design and Storage .............................................................................. 102 7.0 EMERGENCY RESPONSE ........................................................................................................ 104 7.1 Firefighter Response .................................................................................................................... 105 7.2 Key Contributing Factors to Emergency Responders’ Fatality ................................................... 107 7.2.1 Lack of Incident Command System ................................................................................ 107 7.2.2 Lack of Established Incident Management System ........................................................ 108 7.2.3 Firefighter Training ......................................................................................................... 110 7.2.4 Firefighter FGAN Knowledge and Lack of HAZMAT Training ................................... 112 7.2.5 Lack of Situational Awareness and Risk Assessment Knowledge ................................. 116 7.2.6 Lack of Pre-Incident Planning at Facility ....................................................................... 117 7.3 Limited and Conflicting Technical Guidance on FGAN ............................................................. 119

West Fertilizer Company Final Report January 2016 3 U.S. CHEMICAL SAFETY AND HAZARD INVESTIGATION BOARD

  1. 3.1

Emergency Response Guidebook ................................................................................... 120 7.3.2 Safety Data Sheets .......................................................................................................... 125 7.4 Lessons Not Learned and Lessons Learned ................................................................................. 127 7.4.1 Pre-West-Incident FGAN-Related Fires and Explosions: Lessons Not Learned ........... 127 7.4.2 Post-West Incident FGAN-Related Fire: Lessons Learned ............................................ 131 7.5 Other Post-Incident Investigation Reports Related to Firefighting .............................................. 136 7.5.1 Texas State Fire Marshal’s Office (SFMO) .................................................................... 136 7.5.2 NIOSH Findings and Recommendations ........................................................................ 137 7.6 Summary of Incident Emergency Response ................................................................................ 138 7.7 Firefighter Training Grants and Programs ................................................................................... 139 7.7.1 Need for Training ............................................................................................................ 139 7.7.2 National Firefighter Training Funds and Programs ........................................................ 142 7.7.3 National Membership Firefighter Associations .............................................................. 163 8.0 REGULATORY ANALYSIS ...................................................................................................... 164 8.1 President Obama’s Executive Order 13650 ................................................................................. 164 8.2 OSHA Explosives and Blasting Agents Standard ........................................................................ 165 8.2.1 OSHA Issuance of Guidance on Explosives and Blasting Agents Standard .................. 171 8.2.2 Need for an Emphasis Program ...................................................................................... 173 8.3 Chemical Facility Anti-Terrorism Standards (CFATS) ............................................................... 173 8.3.1 AN Screening Thresholds ............................................................................................... 174 8.4 Safety Management Programs ..................................................................................................... 176 8.4.1 OSHA Process Safety Management Standard ................................................................ 176 8.4.2 EPA Risk Management Program Rule ........................................................................... 183 8.5 Emergency Planning .................................................................................................................... 195 8.5.1 Federal Emergency Planning .......................................................................................... 196 8.5.2 State Emergency Planning in the State of Texas ............................................................ 199 8.5.3 City Emergency Planning in the City of West ................................................................ 200 8.5.4 Other Emergency Planning Requirements ...................................................................... 204 8.6 Fire Protection Codes and Standards ........................................................................................... 205 8.6.1 National Fire Protection Association .............................................................................. 206 8.6.2 International Code Council ............................................................................................. 209 8.6.3 State Fire Codes .............................................................................................................. 210

West Fertilizer Company Final Report January 2016 4 U.S. CHEMICAL SAFETY AND HAZARD INVESTIGATION BOARD

  1. 7

Post-Incident State and Local Regulatory Developments ............................................................ 213 8.7.1 Texas Commercial Fertilizer Rules ................................................................................ 214 8.7.2 Texas House Bill 942 ...................................................................................................... 214 8.7.3 Athens City Ordinance .................................................................................................... 215 8.8 Industry Standards ....................................................................................................................... 216 8.8.1 The Fertilizer Institute (TFI) ........................................................................................... 216 8.8.2 Agricultural Retailers Association (ARA) ...................................................................... 218 8.8.3 Product Stewardship ....................................................................................................... 218 8.8.4 Efforts to Address FGAN Hazards Post-Incident ........................................................... 220 9.0 LAND USE .................................................................................................................................. 223 9.1 Land Use Planning: An Introduction ........................................................................................... 223 9.2 The City That “Came to” the WFC Over the Years .................................................................... 224 9.3 Lack of Zoning Regulations ......................................................................................................... 227 9.3.1 Importance of Land Use Planning in Siting Communities Near Facilities Storing FGAN and Other Hazardous Chemicals ..................................................................................... 233 9.3.2 International Perspectives ............................................................................................... 234 9.4 Efforts to Address Land Use Planning After the West Incident .................................................. 239 10.0 KEY FINDINGS .......................................................................................................................... 240 11.0 RECOMMENDATIONS ............................................................................................................. 242 12.0 APPENDIX A: REBUILDING OF THE WEST INDEPENDENT SCHOOL DISTRICT ........ 250 13.0 APPENDIX B: FGAN INCIDENTS TABLES ........................................................................... 252 14.0 APPENDIX C: TFI SAFETY AND SECURITY TOOLS .......................................................... 262 15.0 APPENDIX D: RESPONSIBLEAG ............................................................................................ 264

West Fertilizer Company Final Report January 2016 5 U.S. CHEMICAL SAFETY AND HAZARD INVESTIGATION BOARD

Figures Figure 1. 2013 Overview of WFC Facility (Source: Bing Maps) ............................................................... 18 Figure 2. Grain Silos (Source: WFC Insurer) ............................................................................................. 19 Figure 3. West View of Fertilizer Building (Source: Bing Maps) .............................................................. 20 Figure 4. Fertilizer Building Overview (Source: Atlas Engineering) ......................................................... 21 Figure 5. Southwest View from Northeast Corner of Fertilizer Building (Source: WFC Insurer) ............. 21 Figure 6. Anhydrous Ammonia Storage (Source: WFC Insurer) ............................................................... 22 Figure 7. West View from East of Fertilizer Building (Source: WFC Insurer) .......................................... 23 Figure 8. Plywood Bin Wall, Post-Explosion (Source: CSB) ..................................................................... 24 Figure 9. Elevator System Recovered from Blast Debris (Source: CSB) ................................................... 25 Figure 10. Video Stills of WFC Fire and Explosion (Source: Member of the Public) ............................... 30 Figure 11. Number of Nonfatal Injuries, by Injury Type (Source: Waco-McLennan County Public Health District) ..................................................................................................................................... 31 Figure 12. Overview of Damage to WFC Facility (Source: Texas Civil Air Patrol) .................................. 33 Figure 13. Damaged WVFD Water Tender (Source: ABS Consulting) ..................................................... 34 Figure 14. Farm Truck South of Crater, Near the Scale House (Source: ABS Consulting) ....................... 34 Figure 15. Railcar Loaded with FGAN, Destroyed and Overturned by Explosion (Source: CSB) ............ 35 Figure 16. Liquid Fertilizer Tank Damage (Source: CSB) ......................................................................... 35 Figure 17. Anhydrous Ammonia Pressure Vessels (Source: CSB) ............................................................ 36 Figure 18. Damaged Railroad Tracks Adjacent to WFC Facility (Source: CSB) ....................................... 37 Figure 19. Damaged Playground Equipment (Source: ABS Consulting) ................................................... 37 Figure 20. Damaged Basketball Goal Post at Park (Source: ABS Consulting) .......................................... 38 Figure 21. Anhydrous Ammonia Tank PRV, Post-Incident (Source: CSB) ............................................... 39 Figure 22. Proximity of WFC Facility to Schools and Other Public Structures (Source: Google Earth) ... 40 Figure 23. WIS Room Layout in Evacuation Plan (Source: CSB) ............................................................. 42 Figure 24. WIS North Hallway, Looking Toward Northeast Exit Door (Source: ABS Consulting) .......... 43 Figure 25. Glazing Hazard in WIS Room 12 (Source: ABS Consulting) ................................................... 43 Figure 26. Embedded Glass in Assignment Poster in WIS Room 12 (Source: ABS Consulting) ............. 44 Figure 27. Interior of Burned Northeast Section of WIS (Source: ABS Consulting) ................................ 44 Figure 28. WIS Gymnasium (Source: ABS Consulting) ............................................................................ 45 Figure 29. WIS Classroom 20 (Source: ABS Consulting) .......................................................................... 46 Figure 30. WHS Evacuation Map (Source: WISD) .................................................................................... 47

West Fertilizer Company Final Report January 2016 6 U.S. CHEMICAL SAFETY AND HAZARD INVESTIGATION BOARD

Figure 31. WMS Layout (Source: Bing Maps) ........................................................................................... 48 Figure 32. Classroom Annex Interior Hallway and Ceiling Damage at WMS (Source: ABS Consulting) 49 Figure 33. Damage to Reagan Street Entry of West Rest Haven (Source: ABS Consulting) ..................... 50 Figure 34. Emergency Exit Floor Plan for the West Rest Haven (Source: CSB) ....................................... 52 Figure 35. Crater and Debris (left) from Fragment (right) of WFC Facility Foundation that Impacted West Rest Haven (Source: ABS Consulting) ..................................................................................... 53 Figure 36. West Terrace Apartment Complex East Façade (Source: CSB) ................................................ 54 Figure 37. Example of Damage to Single-Family Residential Structure (Source: ABS Consulting) ......... 55 Figure 38. Initial Light Smoke (left) Followed by Dark Plume (right) (Source: Member of the Public) .. 65 Figure 39. Dark and Heavy Smoke, Rich in Soot (Source: Member of the Public) .................................. 66 Figure 40. Photographs from 7:42 pm (left) and 7:45 pm (right), Showing Transition to Lighter Smoke and Larger Flame, Before Detonation at Approximately 7:51 pm (Source: Member of the Public) ....................................................................................................................................... 67 Figure 41. Plume of Smoke from AN Fire in Bryan, Texas (Source: College Station Fire Department).. 68 Figure 42. Potential Explosive Train Layers on AN Pile Before Detonation (Source: CSB) ..................... 70 Figure 43. North Side of Structure Approximately 3 Minutes Before Detonation, with Dark Foreground Objects Associated with the Bin Complex North of Fertilizer Building (Source: Member of the Public) ....................................................................................................................................... 72 Figure 44. Solidified Fertilizer Collected from WFC Property (Approximate Location Unknown) (Source: Forensic Laboratory) ................................................................................................................. 75 Figure 45. FGAN Prills Collected from a Railcar on WFC Property (Source: Forensic Laboratory) ........ 75 Figure 46. Farmer’s Sample of FGAN and AS Blend (Source: Forensic Laboratory) ............................... 75 Figure 47. Physical Comparison of Samples (20x) (Source: Forensic Laboratory) ................................... 77 Figure 48. Ground-Level View of WFC Explosion Crater (Source: CSB) ................................................ 79 Figure 49. WFC Explosion Crater Profile Measurements (Source: Army Corps of Engineers) ................ 80 Figure 50. Overhead View of WFC Bins, with Crater Underlay (Source: Atlas Engineering) .................. 81 Figure 51. Elevation View of Fertilizer Building, with Crater Depth (Source: Atlas Engineering) ........... 81 Figure 52. Data Recorded at Lake Whitney Station, WHTX, and Seismograph by the USGS National Earthquake Information Center (Source: USGS) ...................................................................... 82 Figure 53. Exposed 440-Volt Electrical Wiring Identified in 2007 Survey (Source: Triangle Insurance Company) .................................................................................................................................. 84 Figure 54. Damaged Electrical Cord Identified in 2008 Insurance Survey (Source: Triangle Insurance Company) .................................................................................................................................. 85 Figure 55. Overhead View of a School Approximately 529 Feet from an FGAN Storage Facility (Source: Google Earth) ............................................................................................................................ 89

West Fertilizer Company Final Report January 2016 7 U.S. CHEMICAL SAFETY AND HAZARD INVESTIGATION BOARD

Figure 56. Breakdown of FGAN Storage Facilities (10,000 pounds or more) Within 1 Mile of a Texas School (Source: CSB) ............................................................................................................... 89 Figure 57. Overhead View of a Texas FGAN Storage Facility near a Hospital, Residence, and School (Source: Google Earth) ............................................................................................................. 90 Figure 58. Distribution of ISO Class Ratings for Cities and Communities in Texas (Source: ISO) .......... 95 Figure 59. Distribution of ISO Class Ratings for All U.S. Cities and Communities (Source: ISO) ........... 96 Figure 60. Risk Control Hierarchy (Source: CCPS) ................................................................................... 98 Figure 61. Reconstructed EDC Facility in Bryan, Texas (Source: CSB) ................................................. 104 Figure 62. Timeline of Events for Emergency Response to WFC Facility (Source: CSB) ....................... 106 Figure 63. Cover Page of 2012 Edition of ERG (Source: DOT PHMSA) ................................................ 121 Figure 64. Cover Page of 2016 Edition of ERG (Source: DOT PHMSA) ................................................ 124 Figure 65. Post-Incident Aerial View of EDC Facility Wooden Fertilizer Warehouse (Source: Bryan- College Station Eagle) ............................................................................................................ 130 Figure 66. Dark Grey Smoke Originating from East Texas Ag Supply Facility in Downtown Athens, Texas (Source: Athens Fire Department) ................................................................................ 133 Figure 67. Dark Smoke Combined with Flames at East Texas Ag Supply Facility in Athens, Texas (Source: Athens Fire Department) .......................................................................................... 134 Figure 68. East Texas Ag Supply Facility’s Masonry Brick Walls, Engulfed by Fire and Smoke (Source: Athens Fire Department) ......................................................................................................... 135 Figure 69. Comparison of Volunteer and Career Firefighter Deaths (1977–2013) (Source: NFPA) ....... 141 Figure 70. Assistance to Firefighter Grant Program Recipients in Texas (Source: FEMA) ..................... 147 Figure 71. SAFER Grant Award Recipients in Texas (Source: FEMA) .................................................. 148 Figure 72. FP&S Grant Recipients in Texas (Source: FEMA) ................................................................. 148 Figure 73. Percentage of AN Storage Facilities by Industry (Source: DHS) ............................................ 175 Figure 74. Progressive Development of West (Source: GeoSearch) ........................................................ 226 Figure 75. Aerial Photographs of the WFC Facility Before (left) and After (right) the Incident (Source: NBC News) ............................................................................................................................. 227

Tables Table 1. WFC Fertilizer Inventory in April 2013 ...................................................................................... 16 Table 2. Estimated Number of Students and Staff During School Hours .................................................. 41 Table 3. Infrastructure Repaired with FEMA Funding .............................................................................. 55 Table 4. Forensic Testing Results of Fertilizer Samples Collected from the WFC and the OTSC ............ 76 Table 5. Minimum Insurance Requirements in Texas ................................................................................ 92

West Fertilizer Company Final Report January 2016 8 U.S. CHEMICAL SAFETY AND HAZARD INVESTIGATION BOARD

Table 6. Inherently Safer Approaches for Handling FGAN ....................................................................... 98 Table 7. Examples of AN Fertilizer Alternatives...................................................................................... 100 Table 8. Training and Experience Information of the Fatally Injured Firefighters ................................... 112 Table 9. Comparison of Various AN-Related Firefighting Measures in April 2013 ................................ 126 Table 10. Funds Allocated to WVFD through the Rural VFD Assistance Program ................................ 158 Table 11. OSHA 29 CFR 1910.109(i) Citation History ............................................................................ 169 Table 12. CSB Investigations Involving Reactive Chemicals Since 2002 ............................................... 192 Table 13. EPCRA Chemicals and Reporting Thresholds ......................................................................... 196 Table 14. Relevant Siting Regulations ...................................................................................................... 228 Table 15. Investigations Involving Land Use Issues ................................................................................ 233 Table 16. Distribution of Grade Levels at the Old and New WISD Schools ............................................ 251 Table 17. FGAN Incidents at Stationary Sites .......................................................................................... 254 Table 18. Non-Stationary FGAN Incidents .............................................................................................. 259

West Fertilizer Company Final Report January 2016 9 U.S. CHEMICAL SAFETY AND HAZARD INVESTIGATION BOARD

Acronyms and Abbreviations

°C degrees Celsius °F degrees Fahrenheit AC air conditioning AFG Assistance to Firefighters Grant AHJ Authority Having Jurisdiction AN ammonium nitrate ANFO ammonium nitrate/fuel oil ANSI American National Standards Institute API American Petroleum Institute ARA Agricultural Retailers Association AS ammonium sulfate ATF Bureau of Alcohol, Tobacco, Firearms and Explosives CDC Centers for Disease Control and Prevention CDP Center for Domestic Preparedness CDT central daylight time CEPP Chemical Emergency Preparedness Program CERCLA Comprehensive Environmental Response, Compensation, and Liability Act CFATS Chemical Facility Anti-Terrorism Standards CFR Code of Federal Regulations CMU concrete masonry unit COI chemical of interest CSAT Chemical Security Assessment Tool CSB U.S. Chemical Safety and Hazard Investigation Board CTG Continuing Training Grant DHS U.S. Department of Homeland Security DOL U.S. Department of Labor DOT U.S. Department of Transportation DWC Division of Workers’ Compensation EDT eastern daylight time EHS extremely hazardous substance EMPG Emergency Management Performance Grant EMS emergency medical services EMT emergency medical technician

West Fertilizer Company Final Report January 2016 10 U.S. CHEMICAL SAFETY AND HAZARD INVESTIGATION BOARD

EO Executive Order EPA U.S. Environmental Protection Agency EPCRA Emergency Planning and Community Right-to-Know Act ERDC Engineer Research and Development Center ERG Emergency Response Guidebook ERP Emergency Response Plan EU European Union FAST firefighter assist and search team FEMA Federal Emergency Management Agency FFFIPP Fire Fighter Fatality Investigation and Prevention Program FGAN fertilizer grade ammonium nitrate FP&S Fire Prevention and Safety FR Federal Register FRS Facility Registry Service g/cm3 grams per cubic centimeter GAO U.S. Government Accountability Office GPD Grant Programs Directorate HAZMAT hazardous material HAZWOPER Hazardous Waste Operations and Emergency Response HCS Hazard Communication Standard HUD U.S. Department of Housing and Urban Development HSE UK Health and Safety Executive HSNTP Homeland Security National Training Program HVAC heating, ventilation, and air conditioning IAFC International Association of Fire Chiefs IAFF International Association of Fire Fighters IAP Incident Action Plan IBC International Building Code IC incident commander ICC International Code Council ICS Incident Command System ICT Insurance Council of Texas IFC International Fire Code IME Institute of Makers of Explosives ISO Insurance Services Office

West Fertilizer Company Final Report January 2016 11 U.S. CHEMICAL SAFETY AND HAZARD INVESTIGATION BOARD

IST inherently safer technology K-Mag potassium magnesium LEPC Local Emergency Planning Committee LNG liquefied natural gas MOU memorandum of understanding MSDS Material Safety Data Sheet NAICS North American Industry Classification System NEIC National Earthquake Information Center NERRTC National Emergency Response and Rescue Training Center NEW net explosive weight NFA National Fire Academy NFPA National Fire Protection Association NIMS National Incident Management System NIOSH National Institute for Occupational Safety and Health NOX nitrogen oxide NPD National Preparedness Directorate NTED National Training and Education Division NVFC National Volunteer Fire Council NYC New York City OSHA Occupational Safety and Health Administration OTSC Office of the Texas State Chemist PHMSA Pipeline and Hazardous Materials Safety Administration PPC Public Protection Classification PPE personal protective equipment PRV pressure relief valve PSI pounds per square inch PSM Process Safety Management (standard) PVC polyvinyl chloride Q&A question and answer RCRA Resource Conservation and Recovery Act RDPC Rural Domestic Preparedness Consortium RFI request for information RMP Risk Management Plan SAA State Administrative Agency SAFER Staffing for Adequate Fire and Emergency Response

West Fertilizer Company Final Report January 2016 12 U.S. CHEMICAL SAFETY AND HAZARD INVESTIGATION BOARD

SARA Superfund Amendments and Reauthorization Act SBA Small Business Administration SDS Safety Data Sheet SERC State Emergency Response Commission SFFMA State Firefighters’ and Fire Marshals’ Association SFMO State Fire Marshal’s Office SIC Standard Industrial Classification SOP standard operating procedure SPCC spill prevention, control, and countermeasures TAC Texas Administrative Code TCEQ Texas Commission on Environmental Quality TCFP Texas Commission on Fire Protection TDI Texas Department of Insurance TEEX Texas A&M Engineering Extension Service TFI The Fertilizer Institute TGAN technical grade ammonium nitrate TIESB Texas Industrial Emergency Services Board TNT Trinitrotoluene TR technical report TRANSCAER Transportation Community Awareness and Emergency Response TRI Toxics Release Inventory TX Texas U.K. United Kingdom USFA U.S. Fire Administration USGS U.S. Geological Survey VFD volunteer fire department WFC West Fertilizer Company WFD West Fire Department WIS West Intermediate School WISD West Independent School District WMS West Middle School WVFD West Volunteer Fire Department

West Fertilizer Company Final Report January 2016 13 U.S. CHEMICAL SAFETY AND HAZARD INVESTIGATION BOARD

  1. 0 Executive Summary
  2. 1 Overview

On April 17, 2013, a fire and explosion occurred at the West Fertilizer Company (WFC), a fertilizer blending, retail, and distribution facility in West, Texas. The violent detonation fatally injured 12 emergency responders and three members of the public. Local hospitals treated more than 260 injured victims, many of whom required hospital admission. The blast completely destroyed the WFC facility and caused widespread damage to more than 150 offsite buildings. The WFC explosion is one of the most destructive incidents ever investigated by the U.S. Chemical Safety and Hazard Investigation Board (CSB) as measured by the loss of life among emergency responders and civilians; the many injuries sustained by people both inside and outside the facility fenceline; and the extensive damage to residences, schools, and other structures. Following the explosion, WFC filed for bankruptcy. The explosion happened at about 7:51 pm central daylight time (CDT), approximately 20 minutes after the first signs of a fire were reported to the local 911 emergency response dispatch center. Several local volunteer fire departments responded to the facility, which had a stockpile of between 40 and 60 tons (80,000 to 120,000 pounds) fertilizer grade ammonium nitrate (FGAN), not counting additional FGAN not yet offloaded from a railcar. More than half of the structures damaged during the explosion were demolished to make way for reconstruction. The demolished buildings include an intermediate school (552 feet southwest of the facility), a high school (1,263 feet southeast), a two-story apartment complex with 22 units (450 feet west) where two members of the public were fatally injured, and a 145-bed nursing home (500 feet west) where many of the seriously injured civilians resided. A middle school (2,000 feet southwest) also sustained serious but reparable damage. Section 3 describes the incident and its consequences in detail. The CSB investigated the factors that contributed to the detonation of FGAN. Section 4 describes the properties of FGAN and posits three scenarios that could lead to its detonation under the conditions present during the WFC fire. CSB concluded that the construction of the bins and other building materials as well as the lack of an automatic sprinkler system plausibly contributed to the detonation. Section 6 describes inherently safer approaches to FGAN use and storage that reduce the risk of an FGAN detonation. The total insurance-related losses from the explosion are estimated to be around $230 million and federal disaster assistance is estimated to exceed $16 million. WFC was only insured for $1 million, which fell far short of the incident’s damage. Section 5 presents CSB’s analysis of the policies and regulations that led to this as well as to the failure of the insurer to identify the risks posed by FGAN. A few years prior to the incident, WFC was dropped by one insurer for failing to address safety concerns identified in loss control surveys. The company that insured WFC at the time of the incident did not appear to have conducted its own safety inspections of the facility.

West Fertilizer Company Final Report January 2016 14 U.S. CHEMICAL SAFETY AND HAZARD INVESTIGATION BOARD

CSB’s analysis of the emergency response, found in Section 7, concludes that the West Volunteer Fire Department did not conduct pre-incident planning or response training at WFC, was likely unaware of the potential for FGAN detonation, did not take recommended incident response actions at the fire scene, and did not have appropriate training in hazardous materials response. CSB found several shortcomings in federal and state regulations and standards that could reduce the risk of another incident of this type. These include the Occupational Safety and Health Administration’s Explosives and Blasting Agents and Process Safety Management standards, the Environmental Protection Agency’s Risk Management Program and Emergency Planning and Community Right-to-Know Act, and training provided or certified by the Texas Commission on Fire Protection and the State Firefighters’ and Fire Marshals’ Association of Texas. CSB’s complete analysis is presented in Section 8. The location of the WFC relative to the surrounding community exacerbated the offsite consequences, leading CSB to assess whether other FGAN storage facilities could pose significant offsite risks. CSB’s analysis shows that the risk to the public from a catastrophic incident exists at least within the state of Texas, if not more broadly. For example, 19 other Texas facilities storing more than 10,000 pounds of FGAN are located within 0.5 miles of a school, hospital, or nursing home, raising concerns that an incident with offsite consequences of this magnitude could happen again. Section 9 explores the connection between land use planning and offsite consequences. 1.2 Federal and State Response In response to this incident, President Barack Obama issued Executive Order (EO) 13650, “Improving Chemical Facility Safety and Security” to coordinate federal actions to reduce the risks of another incident of this type.1 Details and updates on the status of the EO are included in Section 8.1. Early investigation activities focused on law enforcement efforts to determine if there was a criminal element to the incident. Responding governmental agencies included the U.S. Bureau of Alcohol, Tobacco, Firearms and Explosives (ATF) National Response Team, Texas State Fire Marshal’s Office (SFMO), U.S. Occupational Safety and Health Administration (OSHA), Texas Commission on Environmental Equality, U.S. Federal Emergency Management Agency (FEMA), and U.S. Environmental Protection Agency (EPA). In addition, multiple state and local law enforcement and emergency response organizations responded to the scene. 1.2.1 Joint SFMO/ATF Investigation Immediately following the incident, ATF deployed to West at the invitation of SFMO and assumed control of the WFC site to conduct a joint investigation of the immediate cause and origin of the fire and explosion and determine whether the initiating fire was intentionally set. The two agencies retained

1 Executive Order 13650. “Improving Chemical Facility Safety and Security,” August 1, 2013. See: https://www.whitehouse.gov/the-press-office/2013/08/01/executive-order-improving-chemical-facility-safety-and- security (accessed on December 8, 2015).

West Fertilizer Company Final Report January 2016 15 U.S. CHEMICAL SAFETY AND HAZARD INVESTIGATION BOARD

control of the scene for about four weeks, interviewing witnesses, excavating the WFC site, and reconstructing the electrical system. To date, law enforcement has not made a final determination of the cause of the fire and ensuing explosion. Three possible scenarios remain under consideration: (1) faulty electrical wiring, (2) short circuit in an electrical golf cart, and (3) intentional act of arson.2 1.2.2 CSB Response CSB investigators from both the Washington, DC, and Denver, Colorado, offices deployed on April 18, 2013, supported by a contingent of contractors that included blast modeling, structural, urban search and rescue, and fire and explosion experts. The joint ATF-SFMO control of the site as a crime scene limited CSB site access and delayed CSB investigator execution of evidence-gathering protocols, chemical testing, and witness interviews. Despite the limited access in the initial stages, driven by the criminal investigation, CSB continued with its investigation. The investigation of the WFC incident analyzed several root causes and considered multiple contributing causes. Investigative teams partnered with urban search and rescue experts and fire and explosion consultants to survey damage to residences, schools, the nursing home, and other structures. The teams also conducted interviews with eyewitnesses, WFC managers, and hourly workers and gathered physical evidence for further laboratory testing and analysis. Key Findings The CSB’s analysis includes findings on the technical causes of the fire and explosion; regulatory changes that could have resulted in safety enhancements to the facility; the failure of the insurer to conduct safety inspections or provide an adequate level of coverage; shortcomings in emergency response, including pre-incident planning or response training of the volunteer fire fighters; and deficiencies in land use planning that permitted the City of West to encroach upon the WFC over the years. Section 10 presents the CSB’s key findings on the WFC incident. Recommendations As a result of the investigation of the WFC fire and explosion, CSB developed recommendations and directed them to the following recipients: • Environmental Protection Agency (EPA). • Occupational Safety and Health Administration (OSHA), U.S. Department of Labor. • Federal Emergency Management Agency (FEMA), U.S. Department of Homeland Security. • International Codes Council. • Texas Department of Insurance. • Texas Commission on Fire Protection. • State Firefighters’ and Fire Marshals’ Association of Texas. • Texas A&M Engineering Extension Services (TEEX).

2 See: http://www.tdi.texas.gov/news/2013/news201320.html (accessed on December 22, 2015).

West Fertilizer Company Final Report January 2016 16 U.S. CHEMICAL SAFETY AND HAZARD INVESTIGATION BOARD

• El Dorado Chemical Company (EDC). • West Volunteer Fire Department (WVFD).

Section 11 contains the complete set of recommendations. 2.0 Background 2.1 West Fertilizer Company The West Fertilizer Company (WFC) was located in the city of West, Texas. The city is approximately 80 miles south of Dallas, Texas, and has a population of about 2,800.3 The WFC stored and distributed fertilizers, chemicals, grains, and various other farming supplies. At the time of the incident, stockpiles of about 40 to 60 tons of FGAN were estimated to be onsite, and about 30 tons detonated. Table 1 shows the WFC inventory at the time of the explosion and fire. Table 1. WFC Fertilizer Inventory in April 2013 Fertilizer Name Amount (in tons) FGAN (fertilizer building) 40 to 60 FGAN (railcar) 100 Anhydrous ammonia 17 Potash4 45 Diammonium phosphate5 70 Diammonium phosphate and potash 25 Ammonium sulfate6 60 to 70 Zinc sulfate7 17.5

The fertilizer building was constructed in 1961, and business operations started in 1962. Photographs from 1972 show the closest residence about 265 feet from the WFC property. In addition, a baseball field

3 The 2010 U.S. Census data indicate that the population of West, Texas, is 2,807. See: http://www.census.gov/2010census/popmap/ (accessed on December 8, 2015). 4 Potash is an agricultural fertilizer and is a source of soluble potassium (K). 5 Diammonium phosphate (DAP), (NH4)2HPO4, is one of a series of water-soluble ammonium phosphate salts that can be produced when ammonia reacts with phosphoric acid. 6 Ammonium sulfate, (NH4)2SO4, is an inorganic salt with a number of commercial uses. The most common use is as a soil fertilizer. 7 Zinc sulfate, ZnSO4, is an inorganic compound and is a colorless solid that is a common source of soluble zinc ions.

West Fertilizer Company Final Report January 2016 17 U.S. CHEMICAL SAFETY AND HAZARD INVESTIGATION BOARD

was 58 feet from the property. In 1972, the town nursing home and the nearest group of homes were constructed about 500 feet away.8 Over the years, growth in the city of West led to the development of land closer to the WFC property line, including a park (less than 150 feet), an apartment complex, the nearest aggregation of homes (about 370 feet), West Intermediate School (a little more than 200 feet), and West High School (about 500 feet). Sections 3.4.2 through 3.4.7 provide additional details on the property damage resulting from the explosion.9 Figure 1 shows the WFC facility before the fire and explosion in relation to the nearby community, including details on the site and the location of various structures.

8 This information was determined using Image 272-37A provided by McLennan County and distances calculated using Google Earth (accessed on June 6, 2013). 9 Calculated using Google Earth (accessed on June 6, 2013).

West Fertilizer Company Final Report January 2016 18 U.S. CHEMICAL SAFETY AND HAZARD INVESTIGATION BOARD

WFC Facility Legend Figures in Report 1 Grain Silos 2 2 Location of Overturned FGAN Railcar (post-explosion) 15 3

Corn Silo

4

Office/Chemical Storage

5 Fertilizer Building 3-5, 7 6 Liquid Fertilizer Tanks 16 7 Anhydrous Ammonia Pressure Vessels 6, 17, 21 8

Scale House

9

Nearest Fire Hydrant

City of West Legend Figures in Report Approximate Distance from Seat of Blast to Fenceline (Feet)

West Fertilizer Company 2-8, 12 0

West High School 30 1157

West Intermediate School 23-29 552

Basketball Court 20 249

Playground 19 366

West Terrace Apartment Complex 36 454

West Rest Haven Nursing Home 33-35 629

Figure 1. 2013 Overview of WFC Facility (Source: Bing Maps) 2.1.1 Facility Operations Description The West, Texas, site consisted of two companies owned by the same family. Adair Grain, Inc., bought and sold grain while the WFC sold fertilizer, farming chemicals (pesticides and herbicides), and basic farm equipment (such as barbed wire, baling twine, and fencing). The WFC also rented farming equipment (fertilizer spreading equipment, tillage equipment) and spread fertilizer on farmland when needed, and its daily activities were largely based on season and weather.

West Fertilizer Company Final Report January 2016 19 U.S. CHEMICAL SAFETY AND HAZARD INVESTIGATION BOARD

Adair Grain bought grain (milo10 and corn) from farmers and stored it in four onsite silos (shown in Figure 1 and Figure 2). Adair Grain received grain from farmers’ trucks and deposited it into pits (Figure 3). An auger then transferred the grain from these pits, depositing it into the grain bin.

Figure 2. Grain Silos (Source: WFC Insurer)

10 Milo, also called grain sorghum, is a major feed grain for cattle.

West Fertilizer Company Final Report January 2016 20 U.S. CHEMICAL SAFETY AND HAZARD INVESTIGATION BOARD

Fertilizer Loading Pit and Conveyor Belt Railcar of Fertilizer

Figure 3. West View of Fertilizer Building (Source: Bing Maps) The WFC operated two buildings and a number of tanks (shown in Figures 1 and 3). One building served as a chemical warehouse, shop area, and office space. Most chemicals purchased by farmers were stored in that building. Such chemicals included Roundup®, Sevin®, and additives to make pesticides adhere to plants (such as Weedmaster® and Grazonnext®) and were stored in containers ranging in size from 2 to 300 gallons. The WFC also owned the fertilizer building, constructed in the 1960s, where dry fertilizer was stored (Figure 4). Fertilizers stored in that building included diammonium phosphate, ammonium sulfate, potash (potassium chloride), potassium magnesium sulfate (K-Mag), and FGAN. A seed room was located at the north end of this building (Figure 5).

West Fertilizer Company Final Report January 2016 21 U.S. CHEMICAL SAFETY AND HAZARD INVESTIGATION BOARD

Figure 4. Fertilizer Building Overview (Source: Atlas Engineering) Bagged Fertilizer Abandoned Bin Primary Ammonium Nitrate Bin Palletized Zinc Golf Cart Front End Loader Hay Seed Hay Seed Hay Seed Old Seed Storage Top of Elevator Twine

Figure 5. Southwest View from Northeast Corner of Fertilizer Building (Source: WFC Insurer) The WFC facility had two 12,000-gallon anhydrous ammonia11 (NH3) storage vessels, located to the south of the fertilizer building, for distribution and sale of the product to farmers (Figure 6). The

11 Anhydrous ammonia is a colorless and extremely water-soluble gas at room temperature, with a strong irritating odor. Ammonia gas is lighter than air, but under certain conditions, ammonia vapor can settle close to the ground during a leak, forming a white cloud. Ammonia can be compressed into a liquid under pressure, and within a concentration in air range of 15 to 28 percent, it is flammable. This is known as the lower explosive limit (LEL) and upper explosive limit (UEL), respectively. Ammonia exposure at lower concentrations can irritate the skin, eyes, and respiratory system, and at high concentrations, exposure can result in pulmonary edema and death.

West Fertilizer Company Final Report January 2016 22 U.S. CHEMICAL SAFETY AND HAZARD INVESTIGATION BOARD anhydrous ammonia was primarily trucked into the facility, but delivery by rail was also possible. Although anhydrous ammonia is used in the manufacture of AN, the WFC stored it onsite solely for sale to consumers as liquid fertilizer. Adjacent to the anhydrous ammonia tanks, liquid fertilizer was stored outside in several vertical tanks. This type of fertilizer included a urea ammonium nitrate (UAN) solution or liquid phosphate, and could be blended to meet specific farmer needs. One outside tank was normally full of water to mix with chemicals or liquid fertilizer. No products were manufactured onsite; the WFC was essentially a distribution center for suppliers such as Mosaic, BASF, Agri-Phos, El Dorado Chemical Company (EDC), and CF Industries. EDC and CF Industries are the only manufacturers of FGAN in the United States. The WFC mixed and sold bulk fertilizer components or unaltered products such as pure FGAN and ammonium sulfate. Farmers came to the WFC and bought fertilizer that was weighed in a hopper, blended in a mixer, and distributed by conveyor belt (the mixer and conveyor belt can be seen in Figure 7). The WFC also delivered and applied fertilizer or chemicals to a farmer’s fields if needed. Figure 6. Anhydrous Ammonia Storage (Source: WFC Insurer)

West Fertilizer Company Final Report January 2016 23 U.S. CHEMICAL SAFETY AND HAZARD INVESTIGATION BOARD

Figure 7. West View from East of Fertilizer Building (Source: WFC Insurer) 2.1.2 Facility Layout and Materials of Construction The fertilizer building (Figure 4) was a wood-framed structure with a concrete floor, at an elevation about 3 feet above grade. The building was constructed piecemeal over the years, starting with the original construction in 1961. The seed room was fabricated in the early 1980s, with a roof constructed of wooden rafters topped with plywood and covered with asphalt shingles. The only trench or drain in the building was in the cattle trough, which was used to collect fertilizer slurry when it became moist. A series of ladders were positioned adjacent to the elevator. FGAN was stored in two plywood bins along the west wall of the building and in one primary FGAN bin at the north end of building. The primary FGAN bin was normally no more than half full while the fertilizer bins on the west wall could be filled to the top of the containment. In the northeast corner of the building, an abandoned bin had been used to store fertilizer in the past but was unused at the time of the incident. The primary FGAN bin was constructed differently than the bins on the west wall. The bins on the west wall were composed of three walls rising to a height of about 10 feet and an open front. The primary bin was constructed by attaching plywood sheets to the inside of the exterior beams of the structure. The interior walls were also constructed of 6-inch beams with plywood attached. The main bin was estimated to be 8 feet wide, 20 feet long, and 30 feet high. A large hinged door covered the south end of the bin, with a 3-foot opening at the bottom. Holes were cut in the bin to provide air circulation, and a set of holes on the west wall allowed the bin to overflow into a smaller adjacent bin.

West Fertilizer Company Final Report January 2016 24 U.S. CHEMICAL SAFETY AND HAZARD INVESTIGATION BOARD

The door to the bin was normally closed when the bin was filled, and it could be opened to provide access after the inventory was reduced so that the fertilizer was not resting against the door. The bin was just wide enough (8 to 10 feet) to allow a front-end loader to drive in to access and gather the remaining FGAN. Like the west bins, the primary FGAN bin had plywood sheets (including some particle boards) and a wooden frame for support (shown post-explosion in Figure 8). The primary bin also had metal rods connected at opposite sides of the bin, providing internal stiffening support. About 2 years before the WFC explosion, the northeast corner of the north wall of the primary FGAN bin failed, and employees erected steel and concrete reinforcement around the bottom of the northeast corner to provide support and hold up the bin. As a result, the WFC never completely filled the primary bin to avoid another failure. A seed room,12 fabricated in 1980 and located at the north end of the fertilizer building served as the warehouse for seeds sold to consumers. Asphalt shingles covered the roof of the seed room of the fertilizer building. The seed room also stored more than 700 bags of zinc sulfate on the day of the fire and explosion. The zinc sulfate and seeds were stored in bags on pallets, with about 40 to 50 bags per pallet, stacked to a height of about 3 to 4 feet on each pallet. The seed room also contained two pallets of lawn and garden fertilizer (bagged at the WFC), twine, bailing wire, and fencing materials. At the west end of the seed room, 8 to 10 pallets of out-of-season seeds were segregated in an area cooled by an air

12 The seed room was used for storage of seed, bagged fertilizer, equipment, and vehicles, including a riding lawnmower, a golf cart, and a fork lift. It was constructed as an addition to the main fertilizer building in the early 1980s. . Figure 8. Plywood Bin Wall, Post-Explosion (Source: CSB)

West Fertilizer Company Final Report January 2016 25 U.S. CHEMICAL SAFETY AND HAZARD INVESTIGATION BOARD

conditioner. The east end of the seed room stored twine and netting. At the time of the incident, the room held a relatively low inventory of seeds (approximately 30 percent of the room’s capacity, or 3,000 bags of out-of-season seeds). 2.1.3 Unloading of Fertilizer Historically, suppliers delivered bulk fertilizer product by truck or rail, but immediately before the incident, most shipments arrived by truck. All bulk fertilizer was transferred into the bins (located as shown in Figure 4), using the same conveyor belt system described in the previous section. Delivered fertilizer was first deposited into a loading pit. An uncovered 20-inch-wide rubber conveyor belt then transported the product into the fertilizer building. The belt was cupped to hold the fertilizer, which was transferred from this conveyor belt to a bucket elevator (pictured post-explosion in Figure 9).

Figure 9. Elevator System Recovered from Blast Debris (Source: CSB) The elevator lifted the fertilizer to the cupola (the highest structure) and deposited it into polyvinyl chloride (PVC) pipes, which in turn conveyed the fertilizer to either the main FGAN bin or a horizontal conveyor belt for distribution to the bins along the west wall. A valve was used to gravity-feed material to either the large FGAN bin by way of PVC piping (approximately 20 feet long by 1 foot in diameter) or through an approximately 40-foot downpipe toward the horizontal conveyor belt in the main portion of the building. A piece of PVC piping could be added to the downpipe to direct product from the horizontal conveyor belt and to direct FGAN to the two FGAN overload bins on the west wall. The horizontal conveyor belt transported product to the bins in the southern portions of the building. A 6- to 8-foot “kicker” conveyor belt transferred the fertilizer from the horizontal conveyor belt to its final destination in any of the west wall bins. Electric motors powered the conveyor belts. Every fertilizer product used the same conveyor system process for filling the respective bins.

West Fertilizer Company Final Report January 2016 26 U.S. CHEMICAL SAFETY AND HAZARD INVESTIGATION BOARD

Workers used a front-end loader to move the fertilizer within the fertilizer building. For a blended fertilizer product, the operator would place a load of each product in a predetermined quantity into the weigh hopper. After all of the ingredients were weighed, the product was sent via a conveyor belt to a mixer, which had the appearance of a stationary concrete mixer. The mixed product was deposited on a conveyor belt and loaded into a truck or spreader. A yellow auger next to the conveyor mixed seed with fertilizer. Zinc sulfate could also be added to fertilizer. 2.1.4 Housekeeping Because unloading operations in the fertilizer building created a dusty environment, the first task of the day in the fertilizer building was cleaning the floor after work during the previous day and evening. To address these conditions during operating hours, the WFC used fans to control the dust during unloading, and on some occasions, workers added a vegetable oil coating to the ammonium phosphate to reduce the dust.13 An employee reported to CSB that some products were dustier than others and that floor sweeping compound was also applied to the fertilizer building floor on very wet days. When mixing fertilizer, operators usually added phosphate to the hopper and mixer first to eliminate any moisture. The employees reported that because FGAN tends to absorb moisture and dissolve, the WFC used air conditioning to cool and remove moisture from the primary FGAN bin. After the FGAN bin was emptied, it was swept to remove moisture. On damp or humid days, operators minimized handling FGAN unless necessary because it would “melt” and become lost product. When the fertilizer became damp and began to “sweat” onto the floor, it was swept into a trench (cattle trough) on the east side of the fertilizer building. The liquid captured as slurry in the trough was then pumped into a liquid fertilizer tank for disposal. Employees reported that the plywood walls between the bins “stayed pretty clean” and did not require any housekeeping. After a shipment of one type of fertilizer was unloaded, no cleaning process was used to clear the conveyor belt before the next load was transferred. During the unloading process, the fertilizer occasionally spilled because the conveyor belts got off track or ripped. In such cases, operators attempted to separate the products as best they could, but intermixing and cross-contamination nonetheless would occur. The fertilizer in the west bins was occasionally changed out, and if the product became damp and moist, it might have been emptied out with a “drier” product such as K-Mag placed into that bin. The K- Mag would dry out the bin, and afterward, the bin could revert to storage space for another product. Occasionally, the bin walls developed holes or cracks, and when that occurred, either new wood walls were put in place to replace the old ones or caulk was used to fill the holes.

13 Ammonium phosphate was the only product at the WFC with an oil coating.

West Fertilizer Company Final Report January 2016 27 U.S. CHEMICAL SAFETY AND HAZARD INVESTIGATION BOARD

  1. 0 Incident Description

On April 17, 2013, at approximately 7:29 pm, citizens reported signs of smoke and fire at the West Fertilizer Company (WFC) facility to the local 911 dispatch center. Within 20 minutes, a massive explosion occurred, killing 15 people and sending a blast wave through the town that damaged or destroyed many buildings and homes. The fire was witnessed from several vantage points by different individuals associated with the West Police Department, Dallas Fire-Rescue Department, and volunteer fire departments (VFDs) from West, Abbott, Bruceville-Eddy, Mertens, and Navarro Mills. These accounts assisted CSB in determining how the events of the day transpired. 3.1 West Police Department One of the first responders to the incident was a West Police Department officer who was on routine patrol that evening. The officer reported that he smelled smoke as he was driving through the city park14 but was not able to identify the exact location of the smoke until he encountered a concerned citizen who advised him that smoke was venting from the highest portion of the WFC building. The officer advised the dispatch center of the smoke and requested that the West Volunteer Fire Department (WVFD) be dispatched to the WFC facility. Once the officer arrived on scene, he witnessed flames that were visible through the wall, extending upward from the lower level to the upper level of the northeast corner of the two-story fertilizer storage building. Then he called dispatchers again and asked them to inform the WVFD that the smoke had escalated to a structure fire. The WVFD contacted the officer via radio and requested that he establish traffic control to prevent citizens from driving over the fire hoses once the fire engines arrived and laid down fire hoses. The officer agreed but notified the WVFD that he needed to evacuate the city park first. As the officer proceeded to the city park, the responding West firefighters drove past him, heading toward the facility. Once the officer reached the city park, he used his public address system to order an evacuation of the park. After the park was evacuated, he left the area to establish traffic control on the north end of the fertilizer facility. There was no traffic control at the south end toward West High School (WHS), so the officer asked a nearby resident to assist by using his truck to block that intersection. At this time, the officer contacted the police chief and another officer who had called to determine whether he needed assistance. The officer asked the police chief to establish traffic control by the West Intermediate School (WIS) and requested that the other officer relieve the resident who was helping near the high school. Numerous citizens began parking their cars at WHS to watch the fire. The WVFD truck left the WFC facility and headed toward the police officer. The manager of the WFC arrived on scene to assist the WVFD. Via radio traffic, the officer learned that the entire fertilizer storage building was engulfed in flames, and shortly thereafter he saw and felt the explosion. The officer was briefly disoriented and then unsuccessfully attempted via radio and cell phone to notify the dispatch center of the explosion. An

14 The city park consisted of the basketball court and the playground.

West Fertilizer Company Final Report January 2016 28 U.S. CHEMICAL SAFETY AND HAZARD INVESTIGATION BOARD

injured member of the public and an injured firefighter approached the officer, who assisted them. The possibility of further explosions or toxic releases was a concern because of the anhydrous ammonia pressure vessels on the south side of the WFC property. On the basis of this information, the officer decided to evacuate homes within a 1-mile radius. Because the officer’s patrol car would not start, he proceeded on foot along Jerry Mashek Drive and Main Street to alert people to evacuate (refer to Figure 1 for a map of the area). By the time the officer made his way to Reagan Street, he had become aware that other emergency responders had initiated the evacuation of the northern portion of the city. 3.2 West Volunteer Fire Department (WVFD) Emergency dispatchers paged the WVFD, and firefighters responded to the scene with two fire engines, two initial attack apparatus or brush trucks,15 and a water tender truck16 at various times. Dispatchers also paged mutual aid personnel from neighboring counties, including Abbott, which responded. Many of the firefighters also responded by using their personally owned vehicles (POVs). According to eyewitness accounts, the fire intensified very quickly and was described as a rolling fire that moved from the northeast end of the fertilizer building (in the seed storage area north of the office) toward the southern end of the building. Five firefighters arrived on scene in two fire engines at different times. The first fire engine arrived on scene and staged east of the burning structure while one of the brush trucks staged to the north of the first fire engine. Four other firefighters directed water (using two 1.5-inch hoses) from the first fire engine’s internal tank onto the fire through the northeast doorway of the bagged fertilizer room, where fire was present. Once the second fire engine arrived on scene, the two firefighters from that fire engine began laying 1,000 feet of 4-inch hose line from the fire hydrant near the high school (1,600 feet away) toward the fertilizer facility. After laying all of the hose lines from the second fire engine, they discovered that the hose was approximately 700 feet short of the length needed to effectively fight the fire. After assessing the situation, one firefighter arranged to take the first fire engine, which had a better pump with greater pressure capabilities and additional hose that would allow him to continue to reverse-lay the lines.17 However, rather than resuming where the first fire engine ran out of hose, the firefighter went back to the fire hydrant near the high school to connect the first engine to the hydrant without laying the additional length of hose needed to supplement the hose that had already been laid from the second

15 Initial attack fire apparatus as defined in NFPA 1901 is fire apparatus with a permanently mounted fire pump of at least 250 gallons per minute (gpm) capacity, water tank, and hose body whose primary purpose is to initiate a fire suppression attack on structural, vehicular, or vegetation fires and to support associated fire department operations. Normally, most initial attack fire apparatus are constructed on commercial-style chassis. NFPA 190:1 Standard for Automotive Fire Apparatus, 2016 Edition. Quincy, MA: NFPA, 2016. 16 A water tender is the National Incident Management Systems (NIMS) approved term for a wheeled vehicle carrying water for fire suppression. 17 In firefighting, reverse lay refers to the nozzle end of the hose being laid from the fire to a water source. This method is used when the pumper must first go to the fire location to size it up before laying supply line, and it is the most expedient way to lay hose if the apparatus must stay close to the water source.

West Fertilizer Company Final Report January 2016 29 U.S. CHEMICAL SAFETY AND HAZARD INVESTIGATION BOARD

engine. He saw flames (40 to 50 feet high) coming out of the cupola atop the fertilizer storage building and out of the door on the northeast corner of the building. Before the firefighter could make his way back to the end of the hose run, the explosion occurred. Before the explosion, the WVFD assistant chief arrived at the WFC facility, spoke with the police officer on scene, and advised him to begin evacuating nearby homes. He also made a radio request to the dispatch center, asking for a ladder truck to set up at the West Terrace Apartments in case a fire started there, but a ladder truck was not available. The WVFD chief and assistant fire chief were assessing the situation just before the explosion and were considering a total evacuation, even though neither believed that the FGAN would explode.18 On the basis of interviews that CSB conducted after the incident, the WVFD came to understand that it did not have enough water to effectively fight the fire.19 Accordingly, the WVFD was considering the appropriate course of action—possibly standing down, letting the structure burn, and focusing on evacuation. 3.3 Abbott, Bruceville-Eddy, Mertens, and Navarro Mills Volunteer Fire Departments On the evening of the incident, a group of volunteer firefighters from neighboring city fire departments (including Bruceville-Eddy, Mertens, and Navarro Mills), who were taking an Emergency Medical Technician (EMT)–Basic class at the West Emergency Medical Services (EMS) building, responded to the fire. The West EMS facility is located a few blocks west of the WFC facility.20 When these volunteer firefighters heard the sirens activated in the city, they immediately made their way to the site. In addition, an ambulance responded with two EMTs and a volunteer firefighter. According to interviews that CSB conducted with emergency responders, radio and cell phone capabilities at the scene were limited after the explosion. Following the explosion, officials established two different staging areas. The first staging area, at the high school football field about 0.25 miles from the blast site, was used as a triage area for injured residents. Injured personnel and residents were relocated from the football field to the second staging area, at the community center about 1 mile away.21 After the explosion at approximately 8:15 pm, additional volunteer firefighters from the neighboring cities of Abbott, Bruceville-Eddy, Mertens, and Navarro Mills responded to the WFC facility. Figure 10 shows the WFC explosion as it unfolded.

18 Section 7 of this report provides further details on how the evacuation occurred. 19 Employees and emergency responders should not fight AN fires past the incipient stage. Further details on responding to AN fires is available in Section 7.5 and Section 7.6 of this report. 20 State Fire Marshal’s Office. “Firefighter Fatality Investigation,” Investigation FFF FY 13-06 (West, TX). 21 Clements, Bruce. Texas Department of State Health Services, “The Texas Public Health Response to the West Fertilizer Plant Explosion,” October 8, 2013.

West Fertilizer Company Final Report January 2016 30 U.S. CHEMICAL SAFETY AND HAZARD INVESTIGATION BOARD

Figure 10. Video Stills of WFC Fire and Explosion (Source: Member of the Public) 3.4 Consequences 3.4.1 Fatalities and Injuries The violent explosion at the WFC facility fatally injured 12 emergency responders and 3 members of the public. All of the fatalities except one resulted from fractures, blunt force trauma, or blast force injuries sustained at the time of the explosion. Two fatally injured members of the public lived at a nearby apartment complex while the third resided at the nursing home and died from injuries brought on by the trauma of the explosion shortly after the incident. According to the Waco-McLennan County Public Health District’s report, 22 the incident resulted in more than 260 injured victims, including emergency responders and members of the public.23 Hill County (Hill Regional Hospital and Lake Whitney Medical Center) and McLennan County (Hillcrest Baptist Medical Center and Providence Health Center) hospitals received 81 percent of patient visits, with 104 injury visits at Hillcrest Baptist Medical Center, 82 visits at Providence Health Center, 41 injury visits to Hill Regional Hospital, and 1 injury visit at Lake Whitney Medical Center.24 The injuries ranged from relatively minor wounds (such as contusions, abrasions, and lacerations) to more serious injuries (such as fractures, closed head injuries, traumatic brain injuries, and skin burns). The majority of patients were treated and released after their initial visit to a hospital, medical center, or mobile medical unit. Figure 11 categorizes all injury types sustained by the 252 patients injured directly by the explosion; many patients received multiple types of injuries. The Waco- McLennan County Public Health report also identified the location where 76 percent of the reported 252

22 Waco-McLennan County Public Health District. “A Public Health Report on Injuries Related to the West (Texas) Fertilizer Plant Explosion,” June 24, 2014. 23 The number of injured victims includes patients who were treated after the explosion and sustained injuries during clean-up or by debris in the neighborhood. 24 Waco-McLennan County Public Health District. “A Public Health Report on Injuries Related to the West (Texas) Fertilizer Plant Explosion,” June 24, 2014: 7.

West Fertilizer Company Final Report January 2016 31 U.S. CHEMICAL SAFETY AND HAZARD INVESTIGATION BOARD

injuries occurred, outside or inside of a structure. More than half of the injured patients reported being inside a structure (55 percent), and the rest said they were outside (13 percent) or inside of a vehicle (8 percent). The locations cited by the injured also reflected the most common types of injuries. Patients who were inside a structure were twice as likely to suffer abrasions, contusions, and lacerations. People who were outside or inside of a vehicle were eight times more likely to have hearing loss or tinnitus, tympanic membrane rupture, or inhalation injuries. The majority of the injured were within 1,500 feet of the blast, although some were more than 2,000 feet from the explosion; people who were hospitalized were closer to the center of the blast than those who were not admitted. Notably, eye injuries—and traumatic brain injuries and concussions—were equally distributed among the injured, regardless of location.25 Detailed information regarding the cause of nonfatal injuries was not collected and analyzed. Possible causes of injuries include being struck by primary fragment projectiles, by secondary fragments from remote structures and vehicles, or directly by the blast wave.

Figure 11. Number of Nonfatal Injuries, by Injury Type (Source: Waco-McLennan County Public Health District)26 During the investigation, CSB noted two potential scenarios that could have led to more severe consequences. First, if the fire had started during the middle of a normal school day instead of the

25 Waco-McLennan County Public Health District. “A Public Health Report on Injuries Related to the West (Texas) Fertilizer Plant Explosion,” June 24, 2014. 26 Waco-McLennan County Public Health District. “Public Health Report: Injuries Related to the West (Texas) Fertilizer Plant Explosion,” April 2013 (issued on June 24, 2014). 141 134 53 34 31 30 29 21 12 12 6 0 20 40 60 80 100 120 140 160 Abrasions/contusions Lacerations/penetrating trauma Traumatic brain injuries/concussions Tinnitus/hearing problems Eye injuries Inhalation injuries Sprains/strains Fractures/dislocations Blast injuries Tympanic membrane ruptures Burns Number of Injuries

West Fertilizer Company Final Report January 2016 32 U.S. CHEMICAL SAFETY AND HAZARD INVESTIGATION BOARD

evening and if all other conditions remained unchanged (specifically, if onsite WFC employees were unable to extinguish the fire), students would have been present at the intermediate and high schools. Had the schools evacuated, students likely would have assembled in areas such as the gymnasium and multipurpose rooms within the schools (and in other pre-designated areas outside of the schools) before the evacuation to conduct a head count. Given the short time that elapsed before the explosion, many students and staff members might have been injured in the 20 minutes from the first discovery of a fire until the explosion. Second, a railcar loaded with more than 100 tons of FGAN toppled during the explosion but did not detonate. If the contents of the railcar had detonated, the damage, injuries, and fatalities would have been significantly worse. These scenarios are important to consider because throughout the United States, there are many facilities that, like WFC, are located near public structures such as schools.27 3.4.2 Property Damage The West incident caused considerable property damage, including the complete destruction of the WFC facility (Figure 12). An initial estimate by the Texas Department of Insurance set total property damage resulting from the explosion and fire at $100 million. CSB hired a consulting firm28 to perform an assessment of the structural and property damage caused by the fire and explosion. The assessment involved a thorough examination of damage to the WFC facility and to the community structures and facilities.29 As of the publication of this report, neither the owners of the WFC nor the city of West has decided whether the WFC facility would be rebuilt. Currently, the local farmers are using fertilizer from another fertilizer facility in Leroy, Texas, seven miles east of the city of West.

27 Section 5.4 provides further details on the location of schools in relation to FGAN facilities throughout Texas. 28 ABSG Consulting Inc. See: http://www.absconsulting.com/ (accessed on June 26, 2015). 29 Sites examined included the West Intermediate School (WIS), West High School (WHS), West Middle School (WMS), West Rest Haven nursing home, and the park.

West Fertilizer Company Final Report January 2016 33 U.S. CHEMICAL SAFETY AND HAZARD INVESTIGATION BOARD

Figure 12. Overview of Damage to WFC Facility (Source: Texas Civil Air Patrol) The explosion, overpressure, and debris completely destroyed a WVFD brush truck, water tender, and fire engine (Figure 13). The water tender was located southeast of the crater and likely moved about 6 inches south as a result of the blast overpressure. The explosion propelled the door from the water tender to the east. A large farm truck south of the fertilizer storage building and toward the scale house moved about 6 inches south of its original location because of the blast wave (Figure 14). All of the POVs belonging to responding volunteer firefighters who parked onsite were damaged or destroyed in the explosion. In addition, the explosion overturned and destroyed the railroad car loaded with FGAN, approximately 190 feet to the north of the crater (Figure 15).

Overturned FGAN Railcar Vertical Liquid Fertilizer Tanks Fire Department Water Tender EMS Vehicle Damaged Railroad Anhydrous Ammonia Pressure Vessels Overturned FGAN Railcar Vertical Liquid Fertilizer Tanks Fire Department Water Tender EMS Vehicle Anhydrous Ammonia Pressure Vessels

West Fertilizer Company Final Report January 2016 34 U.S. CHEMICAL SAFETY AND HAZARD INVESTIGATION BOARD

Figure 13. Damaged WVFD Water Tender (Source: ABS Consulting)

Figure 14. Farm Truck South of Crater, Near the Scale House (Source: ABS Consulting)

West Fertilizer Company Final Report January 2016 35 U.S. CHEMICAL SAFETY AND HAZARD INVESTIGATION BOARD

Figure 15. Railcar Loaded with FGAN, Destroyed and Overturned by Explosion (Source: CSB) The explosion completely demolished the scale house; the roof and all four walls failed. The explosion flattened the chemical storage and office building east of the fertilizer storage building—all that remained was a stack of metal debris where the building once stood. The explosion also destroyed the corn silo north of the fertilizer storage building. In addition, the blast heavily damaged the above-ground vertical liquid fertilizer storage tanks. As shown in Figure 16, the liquid level during the explosion in the tank to the left is clearly visible by the crease at the top of the tank where the deformation begins. The tank on the right in Figure 16 clearly shows a large debris impact that folded and crushed the tank.

Figure 16. Liquid Fertilizer Tank Damage (Source: CSB)

West Fertilizer Company Final Report January 2016 36 U.S. CHEMICAL SAFETY AND HAZARD INVESTIGATION BOARD

The two 12,000-gallon anhydrous ammonia pressure vessels were approximately 30 percent full of ammonia at the time of the explosion. As shown in Figure 17, the anhydrous ammonia pressure vessels were south of the crater. The pressure relief valves (PRVs) on the northern anhydrous ammonia pressure vessel still had their weather caps on and consequently did not relieve the pressure. The weather caps were missing on the PRVs in the middle of the southern anhydrous ammonia pressure vessel.30 Two additional liquid fertilizer storage tanks sat parallel to the railroad track southwest of the anhydrous ammonia pressure vessels. The blast of the explosion also damaged the tracks on the railroad between the WFC property and the park. The blast was sufficiently powerful to shift the tracks more than 2 feet to one side, creating a prominent curve in the tracks (Figure 18).

Figure 17. Anhydrous Ammonia Pressure Vessels (Source: CSB)

30 The condition of the anhydrous ammonia pressure vessels is discussed in further detail in Section 3.4.2.1 of this report.

West Fertilizer Company Final Report January 2016 37 U.S. CHEMICAL SAFETY AND HAZARD INVESTIGATION BOARD

Figure 18. Damaged Railroad Tracks Adjacent to WFC Facility (Source: CSB) The explosion damaged a playground and basketball court in a park located a few hundred feet west of the WFC facility (Figure 19). The blast destroyed equipment on the playground, including damaging the basketball goal posts on the basketball court (Figure 20). In addition, the trees in the vicinity of the park showed evidence of scorching,31 likely from the fireball when the explosion occurred. The trees were directly downwind of the anhydrous ammonia pressure vessels and were not within the smoke plume from the fire. Pre-explosion video of the fire shows the smoke traveling with the wind but crossing the playground equipment to the north of the basketball courts.

Figure 19. Damaged Playground Equipment (Source: ABS Consulting)

31 The ABS damage assessment did not include making a determination about whether the trees were scorched by the fire or by another source.

West Fertilizer Company Final Report January 2016 38 U.S. CHEMICAL SAFETY AND HAZARD INVESTIGATION BOARD

Figure 20. Damaged Basketball Goal Post at Park (Source: ABS Consulting) 3.4.2.1 WFC Anhydrous Ammonia Vessels The two 12,000-gallon anhydrous ammonia vessels were located at the south end of the storage building, about 150 feet from the site where the initial fire and smoke were observed. Each vessel was more than 46 feet long, with two affixed PRVs set to vent the tanks to the atmosphere if the pressure inside the tanks exceeded predetermined set points, estimated by one employee as between 250 and 300 pounds per square inch (psi). Both sets of PRVs were fitted with orange plastic caps intended to protect the devices from rain and dirt. The vessels shared a common pipeline that allowed switching between the tanks on occasion, but under normal operation, the connecting pipe was kept in a closed position. CSB observed the intact PRVs on top of the vessels (Figure 21) on May 28, 2013, although the polyvinyl chloride (PVC) protective caps were no longer in place on the PRVs of the southernmost tank. The absence of detectable residue of this protective material on the PRV suggested that it was exposed to fire to the degree that it melted. The caps were not found during any post-incident salvage or recovery activities. During salvage operations, a crane with lift bucket reportedly struck the PRV for the northernmost tank, knocking it to the ground where it was found.

West Fertilizer Company Final Report January 2016 39 U.S. CHEMICAL SAFETY AND HAZARD INVESTIGATION BOARD

Figure 21. Anhydrous Ammonia Tank PRV, Post-Incident (Source: CSB) From interviews with employees who were knowledgeable about the frequency of deliveries and volumes in the tanks, CSB learned that the site received as many as four deliveries of anhydrous ammonia per day under normal operating conditions with good weather and that each vessel was at 30 percent capacity, or about 7,200 gallons, at the time of the fire and explosion. After the incident, technicians removed all remaining contents in both vessels. When hazardous materials technicians in fully encapsulated personal protection equipment initially entered the area of the anhydrous ammonia vessels after the site was secured, they observed a leaking valve at the east end of the tanks. In light of a buildup of ice around the valve, it is thought that the material leaking was liquid anhydrous ammonia. Notably, anhydrous ammonia stored under pressure contains latent heat. As the liquid is released, it cools rapidly and interacts with moisture in the atmosphere and can freeze on the pipe and adjacent vessel. However, the vessels did not catastrophically fail on the night of the incident. The CSB considers this to be a near-miss of potentially significant consequence. 3.4.3 West Independent School District The WFC built its facility in 1962, before much of the surrounding community developed. In 1923, the West Independent School District (WISD) (Figure 22) built the West Middle School (WMS), which at the time served as the high school for the city of West. The WMS campus added a building in 1957 that served as supplementary classrooms and library space. The WISD also built West Elementary School (WES) in the early 1960s. WIS was built around 1985, and WHS was constructed in 2000, after the WFC facility was built. Four schools were in close proximity to the facility, including WIS (552 feet southwest

West Fertilizer Company Final Report January 2016 40 U.S. CHEMICAL SAFETY AND HAZARD INVESTIGATION BOARD

of the facility), WHS (1,263 feet southeast of the facility), WMS (2,000 feet southwest of the facility), and WES (4,867 feet southwest of the facility).32

Figure 22. Proximity of WFC Facility to Schools and Other Public Structures (Source: Google Earth)

32 The growth of the community around the WFC facility is discussed in further detail in Section 9 of this report. West Fertilizer Company West High School Playground West Rest Haven West Intermediate School West Middle School West Terrace Apartments West Elementary School

West Fertilizer Company Final Report January 2016 41 U.S. CHEMICAL SAFETY AND HAZARD INVESTIGATION BOARD

The overpressure from the explosion’s blast wave caused most of the damage, although some fires started post-explosion, including those at WIS and many nearby homes. At the time of the incident, school was not in session, which limited the number of fatalities and injuries to members of the public (including students, teachers, and other staff members). However, if the explosion had occurred during normal school hours, the number of injuries and fatalities from the blast wave could have been much higher. Table 2 indicates the projected number of students and staff members who would have been affected and could potentially have been injured or killed by the blast if school had been in session. If all enrolled students had been in school that day, approximately 1,486 students would have been present and vulnerable. Of this total, 665 students would have been at WIS and WHS, which suffered the most severe damage. If the explosion had occurred during school hours and all staff members had been present that day, approximately 191 staff members would have been vulnerable. Of this total, 86 staff members would have been at WIS and WHS. Because of the breadth of damage at the schools, the WISD decided to demolish WIS, WHS, and all WMS facilities except for the gymnasium and the 1923 building. The WISD also demolished select portions of the 1967 annex and the entire cafeteria at WMS. Appendix A includes a discussion of the details of WISD plans to restore and rebuild the school system. For a more complete understanding of the magnitude of the injuries and fatalities that the WFC incident could have caused, this report considers in greater detail the extent of damage at the schools. Table 2. Estimated Number of Students and Staff During School Hours School Grades Estimated Number of Students Enrolled Estimated Number of Staff Members West Intermediate School 4-5 246 22 West Middle School 6 320 40 West High School 7-12 419 64 West Elementary School K-3 501 45 Total Occupants

1,486 171

West Fertilizer Company Final Report January 2016 42 U.S. CHEMICAL SAFETY AND HAZARD INVESTIGATION BOARD

  1. 4.3.1 Damage Assessment of the West Intermediate School

The original WIS was a pre-engineered metal building consisting of lightweight steel frames, cold-formed girts,33 and purlins34 supporting lightweight metal decks. The gymnasium and cafeteria were also pre- engineered metal buildings. The remainder of the school was constructed of precast concrete tilt-up load- bearing walls that supported open webbed steel joists and a metal roof deck with a built-up roof. Figure 23 shows the building room layout in the school evacuation plan and highlights in yellow some classrooms with extensive damage. A considerable amount of debris accumulated in the hallway outside of rooms 11 and 12 (Figure 24). An interior doorframe blocked the hallway; the acoustic ceiling had collapsed; and numerous obstacles would have made exiting the building difficult for students and staff. In addition, the original metal school building just south of this location was involved in a fire after the explosion at the WFC facility, so students and staff members also would have been exposed to smoke and heat. The acoustic ceiling, light fixtures, and other debris were thrown onto all of the desks in the interior of classroom 12 (Figure 25). Moreover, the window on the north facade failed violently, and a large shard of glass (approximately 3 inches long) was embedded in the assignment poster on the south wall of the classroom (Figure 26). Room 8 Room 7 Room 6 Room 5 Room 9 5th Grade Lab Room 10 Girls RR Book Room Boys RR Lounge Workroom Storage Ja Nurse Asst Princ Room 12 Room 11 PRR Room 13 4th Grade Lab Library Room 4 Room 3 Room 2 Tech Room 1 Tech Room 18 Room 17 Room 16 Room 15 Comp Labs Room 19 Cafeteria Gym Gym RRs Room 21 Room 22 Room 23 Room 20 RRs Princ Office Area West Intermediate School Evacuation Route N REAGAN ST.

Figure 23. WIS Room Layout in Evacuation Plan (Source: CSB)

33 A horizontal structural member that spans columns or posts in framed construction and is used to support cladding. Dictionary of Construction, Surveying and Civil Engineering (2012). 34 A horizontal roof member that runs parallel to the ridge and spans the roof trusses and is used to support the roof covering. Dictionary of Construction, Surveying and Civil Engineering (2012).

West Fertilizer Company Final Report January 2016 43 U.S. CHEMICAL SAFETY AND HAZARD INVESTIGATION BOARD

Figure 24. WIS North Hallway, Looking Toward Northeast Exit Door (Source: ABS Consulting)

Figure 25. Glazing Hazard in WIS Room 12 (Source: ABS Consulting)

West Fertilizer Company Final Report January 2016 44 U.S. CHEMICAL SAFETY AND HAZARD INVESTIGATION BOARD

Figure 26. Embedded Glass in Assignment Poster in WIS Room 12 (Source: ABS Consulting) The pre-engineered portion of the school in the northeast corner was heavily damaged by blast overpressure and was also fully engulfed in flames. At the time of the physical survey, blast damage to this portion of the building could not be evaluated because of the magnitude of the fire and associated heat; however, Figure 27 does provide a view looking east down the hallway of this part of the school after the fire.

Figure 27. Interior of Burned Northeast Section of WIS (Source: ABS Consulting)

West Fertilizer Company Final Report January 2016 45 U.S. CHEMICAL SAFETY AND HAZARD INVESTIGATION BOARD

The WFC explosion heavily damaged the WIS gymnasium (Figure 28). There was evidence that some of the built-up roof over the gymnasium burned; however, the level of heat damage to the roof was minor compared to the damage from blast overpressure. The north half of the gymnasium roof failed. Within the gymnasium, the blast heavily damaged the pre-engineered frames, which were unstable as a result. The roof purlins were moderately deformed, with the exception of the failure that occurred on the north half of the frame spans. Furthermore, the windows from the south facade of the gymnasium failed, and the overpressure propelled them over the south bleachers and onto the gym floor. The explosion also heavily damaged the roof in the cafeteria to the south of the gymnasium.

Figure 28. WIS Gymnasium (Source: ABS Consulting) The interior of classroom 20 also sustained significant damage (Figure 29). The acoustic ceiling, light fixtures, and insulation were blown down onto the floor by a combination of the roof motion and the air blast entering through the heating, ventilation, and air conditioning (HVAC) duct after the explosion displaced the rooftop air conditioner. After the incident, the entire contents of the ceiling plenum were found on top of the desks. If the explosion had occurred during school hours, any students or staff members in the room would have been covered in this debris and would have had to climb over (or through) it to reach the exit. In addition, there was evidence that overpressure entered the room through the HVAC opening and was of sufficient magnitude to cause the door latch to fail. The damage to WIS decreased as the distance from the explosion source increased from the northeast to the southwest. WIS also housed the technical department where all of the school servers were kept. The servers and the data stored on them were lost in the explosion and fire.

West Fertilizer Company Final Report January 2016 46 U.S. CHEMICAL SAFETY AND HAZARD INVESTIGATION BOARD

Figure 29. WIS Classroom 20 (Source: ABS Consulting) 3.4.3.2 Damage Assessment of West High School WHS was constructed of concrete masonry unit walls supporting open webbed steel joists and a metal deck with built-up roofing and gravel ballast.35 The building room layout (on the basis of the school evacuation plan) shows that the school was organized into two wings (Figure 31). The north wing contained the activities area, including the two gymnasiums, two weight rooms, boy’s athletics locker room, girl’s athletics locker room, and band hall. The south wing included the classrooms as well as a large lecture hall. Between the two wings were the entry hall, administrative offices, common areas, kitchen, and (to the rear) auditorium. A pre-engineered maintenance building sat directly behind the school to the east.

35 Small gravel placed on a built-up roof to protect the roof from ultraviolet light, heat, and weather and to protect the roof membrane from degradation.

West Fertilizer Company Final Report January 2016 47 U.S. CHEMICAL SAFETY AND HAZARD INVESTIGATION BOARD

N

Figure 30. WHS Evacuation Map (Source: WISD) The WHS auditorium was a steel frame structure with masonry infill walls. After the WFC explosion, some of the masonry veneer on the exterior was loose near the northeast corner. Inside the auditorium, large areas of the hanging ceiling were unstable, and the supporting structure was compromised, especially one area of the ceiling (between the seating and the stage), which was near collapse because of the failed hanger connections. Viewed from underneath, evidence of damage to the ceiling was observable at light fixtures, and evidence of cracking and separation was visible near the walls. However, the severity of the damage and compromise to the ceiling hangers became fully evident when they were inspected from the catwalks above the auditorium. 3.4.3.3 Damage Assessment of West Middle School WMS was the school third farthest from the WFC site, and although it sustained less damage than WIS and WHS, it was nonetheless severely damaged in the explosion. WMS resided at the site of the original WHS, constructed in 1923. The athletic field east of WMS was the site employed for triage and evacuation of the wounded after the explosion (Figure 31).

West Fertilizer Company Final Report January 2016 48 U.S. CHEMICAL SAFETY AND HAZARD INVESTIGATION BOARD

Figure 31. WMS Layout (Source: Bing Maps) The practice gymnasium was a lightweight pre-engineered metal building with a brick facade. The pre- engineered frames buckled after the explosion, resulting in a small permanent deformation of the roof purlins. In addition, the overpressure damaged the roof purlins and frames. An external assessment of the cafeteria and auditorium indicated damage to the ceiling components. Many of the windows on the west facade were unbroken. The original high school classroom building at WMS was constructed in

  1. The windows facing north toward the WFC facility were broken, but only some of the remaining

windows had failed. The building originally was not air conditioned and had a high tin ceiling, but at a later date, a new drop ceiling was installed to accommodate central air conditioning. After the explosion, the new drop ceiling failed, but the original tin ceiling was still in place, and some of the windows were broken. Window hazards thus were low to moderate, and the damage to the exterior appeared to be superficial. The classroom annex building roof structures were open web steel joists supporting a built-up roof on metal deck. The roof structure showed no observable damage; however, the suspended ceiling failed because of the motion of the roof (Figure 32).

West Fertilizer Company Final Report January 2016 49 U.S. CHEMICAL SAFETY AND HAZARD INVESTIGATION BOARD

  1. 4.3.4 Damage Assessment of West Elementary School

WES was the campus farthest from the WFC site and sustained very minimal damage. WES received minor renovations, such as removing and replacing damaged ceilings, replacing damaged windows, and performing general interior clean-up.36 3.4.4 West Rest Haven Nursing Home The explosion also destroyed the West Rest Haven nursing home, located west and within 600 feet of the WFC facility, at the corner of North Reagan Street and West Haven Street (Figure 33). Since 1967, the nursing home had provided residents with routine care and also treated patients with Alzheimer’s disease, diabetes, and hypertension, among many medical conditions. Approximately 20 of the 155 staff members and 130 patients37 were in the nursing home during the explosion. All were evacuated with the assistance of the nursing home staff and neighborhood volunteers, yet 72 patients sustained injuries. The level of severity of the injuries varied from cuts caused by broken glass and building materials to broken bones. An 87-year-old man succumbed to a stress-related heart attack; however, his death was not a direct result of the explosion. Before the explosion, the nursing home’s medical director came to the Reagan Street entrance and directed the charge nurse to begin evacuating residents to the other side of the facility in response to the ongoing fire at the WFC facility. As the charge nurse began the evacuation process, the explosion occurred. During the post-blast evacuation, staff members and volunteers removed many bedridden

36 See: http://www.restorewestisd.com/plans.html (accessed on December 22, 2015). 37 The nursing home had a capacity of 145 individual licenses.

Figure 32. Classroom Annex Interior Hallway and Ceiling Damage at WMS (Source: ABS Consulting)

West Fertilizer Company Final Report January 2016 50 U.S. CHEMICAL SAFETY AND HAZARD INVESTIGATION BOARD

residents from the building through the windows instead of the hallways out of concern that the structure would collapse. The residents were moved from the back of the nursing home to the front during the fire, evacuated after the explosion to a helicopter pad and football field, and eventually moved to the community center. The 72 injured residents were transported to Providence Health Center and Hillcrest Baptist Medical Center to receive treatment. After the residents were treated and released, they were relocated to various nursing homes in the neighboring cities of Waco, Midway, Hewitt, Clifton, and Hillsboro. Uninjured residents were also relocated to these nursing homes. Within 2 months of the incident, 14 of the West Rest Haven nursing home residents died, a figure cited as unusually high by the facility’s administrator,38 and since the incident, approximately 50 patients have died. According to information the nursing home provided to CSB in May 2015, almost all of the 80 living patients who formerly resided at West Rest Haven tentatively planned to return to the nursing home once the new construction was complete.

Figure 33. Damage to Reagan Street Entry of West Rest Haven (Source: ABS Consulting)

38 See: http://www.dallasnews.com/news/west-explosion/human-toll/20130617-some-say-west-blast-rushed-nursing- home-patients-deaths.ece (accessed on December 22, 2015).

West Fertilizer Company Final Report January 2016 51 U.S. CHEMICAL SAFETY AND HAZARD INVESTIGATION BOARD

  1. 4.4.1 West Rest Haven Nursing Home Disaster and Evacuation Plan

West Rest Haven followed a disaster and evacuation plan that include policies and procedures39 to meet all potential types of emergency and nonemergency situations, including fires, disasters, explosions, toxic fumes, train derailments, broken gas mains, auto and truck collisions, and fire drills. The plan included detailed evacuation procedures in the event of a fire as well as shelter-in-place procedures for events such as severe weather. Depending on the location of the fire, patients could be evacuated to another portion of the building rather than being completely removed from the premises. The disaster and evacuation plan also contained transportation and sheltering agreements if needed during an emergency evacuation of the facility. The plan also provided guidance to the facility’s operators on responses to a derailed train or ruptured tank cars containing potentially hazardous liquids and on steps to shelter in place if the facility were exposed to hazardous gas or vapors.40 West Rest Haven scheduled monthly fire drills to meet the requirement to conduct fire drills during each of the three work shifts. In addition, the nursing home held a mock disaster drill approximately 3 months before the explosion, employing a scenario that assumed a toxic gas release from the WFC facility. 3.4.4.2 Damage Assessment of West Rest Haven Nursing Home The West Rest Haven nursing home was irreparably damaged (Figure 33), leading the city to completely demolish the structure 3 months after the incident.41 The nursing home was constructed of load-bearing wood stud walls (with brick veneer) and wood trusses that spanned the wings from exterior wall to exterior wall (east to west). The nursing home’s emergency exit plan (Figure 34) shows the floor plan and room layout. The explosion most heavily damaged the eastern-most corridor of the building. As a result of the explosion, the roof trusses collapsed, and the east wall failed. The eastern rooms were heavily damaged and subjected to flying wall debris and window fragments in addition to failing drywall, insulation, and light fixtures from the ceiling. Investigators observed high glazing hazards, including glass shards that penetrated the wall opposite the windows. The ceilings, insulation, and interior contents of rooms were lying on beds and blocking doorways, posing hazards to any occupants of these rooms. In addition, the air blast would have infiltrated the rooms through the failed windows. Pieces of broken glass littered the inside of the nursing home, with the exception of hallway corridors that were shielded from windows by interior partitions. The great rooms, lobby, and patient rooms were also subjected to significant hazards from broken shards of glass.

39 The disaster and evacuation plan also includes policy and procedures for severe weather, bomb threats, water shortages, electrical power outages, loss of comfort heating, heat and humidity, and floods. 40 West Rest Haven Inc. “Disaster and Evacuation Plan.” 41 See: http://video.dallasnews.com/Damaged-West-nursing-home-razed-3-months-after-blast- 24951515?freewheel=90850&sitesection=dallasnews_nws_non_non&VID=24951515#.Uv58DMKYbIU (accessed on January 4, 2016).

West Fertilizer Company Final Report January 2016 52 U.S. CHEMICAL SAFETY AND HAZARD INVESTIGATION BOARD

Figure 34. Emergency Exit Floor Plan for the West Rest Haven (Source: CSB) The blast also inflicted significant damage to the western portion of the nursing home, and the great rooms, such as the lobby, were hit particularly hard because of the large spans of the overhead trusses that failed and collapsed onto the furniture. In addition, hallways in this area presented many hazards, including hanging light fixtures, failed ceiling joists, and collapsed drywall and insulation on the floors. Moreover, the debris field of the nursing home contained secondary fragments from massive pieces of the WFC facility’s concrete foundation and also significant masses of earth. Observations indicated that a large piece of the WFC foundation, measuring 16 inches wide by 16 inches tall and 36 inches long (Figure 35, right) impacted room 79, traveling through the roof and the exterior wall (Figure 35, left). This debris fragment was calculated at a weight of approximately 800 pounds and had sufficient momentum after the impact to exit the nursing home, strike the ground, and then travel an additional 60 feet before coming to rest just to the west of North Davis Street.

West Fertilizer Company Final Report January 2016 53 U.S. CHEMICAL SAFETY AND HAZARD INVESTIGATION BOARD

Figure 35. Crater and Debris (left) from Fragment (right) of WFC Facility Foundation that Impacted West Rest Haven (Source: ABS Consulting) On April 4, 2014, the city of West broke ground at 503 Meadow Drive, a block away from the original site, on the new 120-bed West Rest Haven nursing home (with 75,000 square feet), which opened in summer 2015.42 The estimated construction cost is $11 million. West Rest Haven did not receive any grants or federal money to rebuild the facility. 3.4.5 West Terrace Apartment Complex The West Terrace Apartment Complex, a 22-unit apartment complex built in 1979 and owned by J&B Realty Ltd., was 450 feet due west of the epicenter of the explosion. Two members of the public were fatally injured at the apartment complex. One of the victims was most likely standing on the east side of the complex and watching the fire shortly before the explosion occurred. The second victim was most likely inside her lower-level one-bedroom apartment. The apartment building had four vacant units that were being used for storage. At the time of the explosion, a member of the cleaning staff was just finishing servicing one of the recently vacant units; she was injured in the blast while exiting the apartment building and walking down the stairs to her car. This worker’s mother accompanied her on the job that day and was in the just-serviced unit, waiting for her daughter to return with the car, when the explosion occurred; however, the worker’s mother was not injured. Four residents of the apartment

42 See: http://dfw.cbslocal.com/2014/04/04/groundbreaking-symbolizes-hope-in-west-one-year-later/ (accessed on April 4, 2014).

West Fertilizer Company Final Report January 2016 54 U.S. CHEMICAL SAFETY AND HAZARD INVESTIGATION BOARD

complex were treated at Hillcrest Baptist Medical Hospital, and two residents were treated at Providence Health Center for injuries sustained. The explosion completely destroyed West Terrace. The roof and walls of the building completely failed (Figure 36).

Figure 36. West Terrace Apartment Complex East Façade (Source: CSB) 3.4.6 Private Residences According to the Texas Department of State Health Services, the fire and explosion affected many of the homes within a 2-mile radius of the WFC facility. West had a total of 700 homes, and 350 of those were impacted— with 142with homes damaged beyond repair,43 51 homes suffering major damage, 27 homes incurring minor damage, and 130 homes otherwise affected.44 CSB consultants examined damage to 190 single-family residential buildings within a radius of 3,500 feet of the explosion crater45 and documented broken windows, facade damage, and nonstructural and structural component (e.g., wall and roof system) failures (Figure 37). The damage assessments were performed in the majority of the cases by inspecting the perimeter of the property. Access to home interiors was limited because owners either were not present or were unwilling to grant access.

43 Not all homes that were damaged beyond repair have been rebuilt. 44 Clements, Bruce. Texas Department of State Health Services, “The Texas Public Health Response to the West Fertilizer Plant Explosion,” October 8, 2013. See: http://www.astho.org/Preparedness/DPHP-Materials- 2013/WestTexasExplosion/ (accessed on January 18, 2016). 45 CSB contractors assessed damage that was measured to 3,500 feet from the WFC site, but damage occurred beyond that distance.

West Fertilizer Company Final Report January 2016 55 U.S. CHEMICAL SAFETY AND HAZARD INVESTIGATION BOARD

Figure 37. Example of Damage to Single-Family Residential Structure (Source: ABS Consulting) According to the city of West, 259 building permits were issued as of October 2014. Of those, 79 were for building new homes, 117 for remodeling homes, and 63 for making miscellaneous repairs (such as fence, shed, and carport restoration). 3.4.7 Infrastructure Damage to the City of West The explosion at the WFC facility damaged the West city infrastructure; it ruptured water lines, deformed sewer manholes, damaged water storage tanks, further rendered wells unusable, cracked walls of a pump house, and caused the loss of water supply to the community. Access to water was restored gradually as the affected infrastructure was repaired. As a result of the explosion, FEMA assisted the city in repairing some of the damaged infrastructure listed in Table 3, such as water facilities and water lines. Table 3. Infrastructure Repaired with FEMA Funding Affected Infrastructure Cost to Repair Damage Well 4, Ground Storage Tank $365,000

West Fertilizer Company Final Report January 2016 56 U.S. CHEMICAL SAFETY AND HAZARD INVESTIGATION BOARD

Well 4, Pump Station Door and Window $2,000 Davis Street Water Line $74,000 Walnut Street Sewer Manhole $9,200 Total $450,200

The West water system is fed by a 12-inch supply line from the city of Waco at a pump station 11 miles south of West. The pump station supplies 700 gallons per minute, with a storage capacity of 167,000 gallons. Water pressure for homes is usually 48 to 50 psi; however, on the morning after the incident, water pressure was measured at less than 20 psi because of damaged water lines. In response to the abnormal water pressure, the city issued a boil water order. West used two water wells to supply water to the community. The first well had a capacity of 250,000 gallons; however, it had been out of service for about 7 years at the time of the explosion. The second well also had a capacity of 250,000 gallons and was removed from service in January 2013 for rehabilitation.46 This well also was damaged as a result of the explosion but has since been repaired and was back online as of September 1, 2014. The city also has an above-ground water tower with a storage capacity of 150,000 gallons; the tower was nearly drained by the post-explosion fire department response.47 According to CSB interviews conducted with the Abbott Fire Department, West had a history of improperly working water hydrants and consistently low water pressure. Abbott firefighters had previously responded to fires in West and were unable to get hydrants to work adequately. The city had installed the above-ground water tower before the WFC incident to address the issue of low pressure. According to the Mayor of West, “The city generates its revenue in three ways—water and sewer rates, property tax, and sales tax.” During the first 2 months after the explosion, West experienced a loss of income (65 percent of water and sewer revenue and 30 percent of property tax values).48 As of June 2013, the city of West indicated that the fire and explosion at WFC had cost the city $17 million in actual damages; however, the total cost-to-date may be greater as additional demolition, renovation, and construction projects continue throughout the city. On April 15, 2014, the State of Texas provided additional disaster grant assistance49 to the city of West in the amount of $4,853,500 to fund the disaster recovery work on the water plants, water tank rehabilitation, wastewater outfall interceptor, and disaster zone infrastructure repairs.50 The first infrastructure project (costing $400,000) was completed in August 2014 and involved installation of a new well and upgrading of a storage tank located by the new nursing home.

46 State Fire Marshal’s Office. “Firefighter Fatality Investigation,” Investigation FFF FY 13-06 (West, TX). 47 Ibid. 48 See: http://www.cityofwest.com/wp-content/uploads/2012/12/June-2013.pdf (accessed on December 22, 2015). 49 The State of Texas provided an initial $3.2 million disaster grant in August 2013. 50 The State of Texas. Office of the Governor, “Letter to the City of West,” April 15, 2014.

West Fertilizer Company Final Report January 2016 57 U.S. CHEMICAL SAFETY AND HAZARD INVESTIGATION BOARD

  1. 0 Incident Analysis
  2. 1 Fertilizer Grade Ammonium Nitrate (FGAN)
  3. 1.1 The Fertilizer Industry

The Fertilizer Institute defines fertilizer as a “collection of elements needed for plants to grow well.”51 The application of fertilizer to soil provides nutrients for plants to enhance fertility and the production of crops. The primary nutrients for plant nutrition are nitrogen (N), phosphorous (P), and potassium (K). Nitrogen is considered the most important of the three nutrients because it is critical to the formation of protein, which composes the tissue of most living things. Although nitrogen exists in the composition of air, it does not exist in a form that plants can readily absorb. Accordingly, farmers apply fertilizers containing nitrogen compounds to their soils to enhance crop production. Nitrogen is most readily available for plants in its inorganic forms, such as ammonium (NH4+) or nitrate (NO3-) ions. It is applied to crops in different forms such as dry granules, liquid, or injection into the soil as a gas. The largest source of nitrogen by volume in commercial fertilizer is anhydrous ammonia, which is applied directly to crops.52 Other important nitrogen fertilizers include aqueous ammonia (NH3), ammonium sulfate ((NH4)2SO4)), ammonium thiosulfate (H8N2O3S2), calcium nitrate (Ca(NO3)2), sodium nitrate (NaNO3) and FGAN. FGAN, the substance in the fertilizer involved in the West Fertilizer Company (WFC) explosion, is primarily used on pastureland, hay, and fruit and vegetable crops. FGAN is most commonly used in the Southeast and Midwest in the United States, and the largest AN consumers are Missouri (20 percent), Tennessee (14 percent), Alabama (10 percent), and Texas (8 percent). 53 4.1.2 AN Properties AN (NH4NO3) is a salt compound produced by neutralizing nitric acid (HNO3) with anhydrous ammonia (NH3). The AN manufacturing process involves several steps, including solution formation and concentration; solids formation, finishing, screening, and coating; and product bagging, bulk shipping, or both. AN is marketed in different forms depending on its use, but it is primarily manufactured for use in fertilizers or as a precursor in the manufacture of explosives. Liquid FGAN can be sold as a fertilizer or may be concentrated to form a dry solid product. This solid product may be used for fertilizer or fertilizer blends or may be incorporated as part of an explosive. Pure solid AN is a white or grey odorless material that is marketed in several different forms, such as prills, grains, granules, or crystals. Prills are the most commonly produced form and take the shape of spherical pellets. High-density prills are used for FGAN;

51 The Fertilizer Institute. Fertilizer 101, Nourish, Replenish, Grow. Washington, DC: The Fertilizer Institute, 2010: 13. 52 See: https://www.tfi.org/safety-and-security-tools/get-know-fertilizer-retailer/infographics/ammonium-nitrate- infographic (accessed on November 18, 2015). 53 Ibid.

West Fertilizer Company Final Report January 2016 58 U.S. CHEMICAL SAFETY AND HAZARD INVESTIGATION BOARD

low-density porous prills are generally considered technical grade ammonium nitrate (TGAN) or explosive grade ammonium nitrate, both of which are used in the manufacturing of explosives. Chemically, however, these prills are identical; the difference is that small quantities of coatings and stabilizers are added to FGAN to prevent caking and degradation. 4.1.3 AN Hazards Under normal conditions, pure solid AN is a stable material; it usually is not sensitive to mild shock or other typical sources of detonation (such as sparks or friction). However, AN exhibits three main hazards in fire situations:

  1. Uncontrollable fire.
  2. Decomposition with the formation of toxic gases.
  3. Explosion.54

These hazards arise in part because AN is an oxidizer. This classification is demonstrated both by the U.S. Department of Transportation (DOT), which categorizes AN as a Class 5.1 oxidizer,55 and by OSHA, which describes it as an oxidizer in its Explosives and Blasting Agents standard, 29 CFR 1910.109. 56 Significantly, AN is classified as an “explosive” when the prills are produced with more than 0.2 percent carbonaceous material. Carbonaceous material is a substance rich in carbon, such as a hydrocarbon. OSHA defines “oxidizer” as a chemical that “initiates or promotes combustion in other materials, thereby causing fire either of itself or through the release of oxygen or other gases.”57 As an oxidizer, AN can increase the flammability or explosibility (or both) of other combustible substances when it decomposes after exposure to heat. As AN decomposes when in contact with heat or fire, the reactions can release gases such as nitric acid (HNO3), ammonia (NH3), nitrogen oxides (NO, NO2), nitrous oxide (N2O), nitrogen, oxygen, and water vapor, depending on the heat and pressure. Some by- products can be toxic when emitted. During fires, AN presents serious risks of explosion beyond those attributed to its oxidizing properties and ability to decompose and emit toxic gases. When AN is contaminated with organic carbon- containing materials or certain inorganic chemicals, its behavior can become dangerously unpredictable,

54 Resources Safety, Division of Mines and Petroleum. Safe Practice: Safe Storage of Solid Ammonium Nitrate. East Perth, Western Australia: Government of Western Australia, 2013. See: http://www.dmp.wa.gov.au/documents/Code_of_Practice/DGS_COP_StorageSolidAmmoniumNitrate.pdf (accessed on August 4, 2015). 55 U.S. DOT. “Hazardous Material Table,” 49 CFR 172.101. See: http://www.phmsa.dot.gov/portal/site/PHMSA/menuitem.6f23687cf7b00b0f22e4c6962d9c8789/?vgnextoid=d84ddf 479bd7d110VgnVCM1000009ed07898RCRD&vgnextchannel=4f347fd9b896b110VgnVCM1000009ed07898RCR D (accessed on August 4, 2015). 56 See: https://www.osha.gov/pls/oshaweb/owadisp.show_document?p_table=STANDARDS&p_id=9755 (accessed on January 13, 2016). 57 OSHA. See: https://www.osha.gov/dsg/hazcom/ghoshacomparison.html (accessed on August 4, 2015).

West Fertilizer Company Final Report January 2016 59 U.S. CHEMICAL SAFETY AND HAZARD INVESTIGATION BOARD

especially when the AN is confined and in the presence of fire or high heat.58 Thus, when AN is combined with contaminants, its explosive sensitivity increases sharply, and the result can lead to detonation.59 Examples of contaminants include organic chemicals, acids, and flammable and combustible materials.60 4.1.3.1 Decomposition of AN AN has a melting point between 311°F and 337°F (155°C and 169°C). It begins to rapidly decompose at a significant rate soon thereafter.61 When it is exposed to high heat and pressure, AN experiences endothermic (heat-absorbing) and exothermic (heat-producing) reactions simultaneously, causing the compound to split into its constituent molecules and also transforming it from solid state to molten, or liquefied, state. When AN decomposes or breaks down under thermal conditions, at least seven unique reactions can occur at varying temperatures, with different heat outputs and rates of reaction.62 Some reactions can produce toxic and detonable by-products. All of the reaction pathways begin with the AN splitting into gaseous ammonia (NH3) and nitric acid (HNO3), although that step is usually not explicit. In the following main exothermic reaction (Eq. 1), which can occur in conditions up to 482°F (250°C), AN yields nitrous oxide and water: NH4NO3 (s)  N2O (g) + 2 H2O (g) (Eq. 1) Above 482°F (250°C), a reversible endothermic reaction (Eq. 2) takes place at a significant rate, splitting the AN to form ammonia and nitric acid: NH4NO3 (s) ↔ NH3 (g) + HNO3 (g) (Eq. 2) This endothermic reaction is accompanied by a number of exothermic reactions between gaseous ammonia (NH3) and nitric acid (HNO3) that vary by degree, depending on reaction conditions. As previously described, AN is in a liquid or molten state, which is aerated with off-gases such as nitrogen oxides (NO, NO2), water vapor, and nitrous oxide (N2O). This bubbly liquid is much more sensitive to detonation than solid prills or unaerated liquid. Depending on the rate of these endothermic and

58 Greiner, Maurice. “Ammonium Nitrate: Hazards and Handling.” Fertilizer Progress January/February (1983): 26– 38. 59 Sun, J. et al. “Catalytic effects of inorganic acids on decomposition of ammonium nitrate.” Journal of Hazardous Materials B127 (2005): 204–210. 60 The OSHA Explosives and Blasting Agents Standard, 29 CFR 1910.109)(i)(5)(i)(a), lists examples of combustible materials or other contaminating substances, including animal fats, baled cotton, baled rags, baled scrap paper, bleaching powder, burlap or cotton bags, caustic soda, coal, coke, charcoal, cork, camphor, excelsior, fibers of any kind, fish oils, fish meal, foam rubber, hay, lubricating oil, linseed oil, or other oxidizable or drying oils, naphthalene, oakum, oiled clothing, oiled paper, oiled textiles, paint, straw, sawdust, wood shavings, or vegetable oil. 61 CF Industries. “FGAN.” Material Safety Data Sheet Number 004. See: http://www.cfindustries.com/pdf/Amtrate_AN_Fertilizer_SDS_NA_FINAL.pdf (accessed on August 4, 2015). 62 U.S. Department of the Army. Department of the Army Technical Manual, Ammunition, General, TM 9-1300-214. Washington, DC: U.S. Department of Defense, September 1984.

West Fertilizer Company Final Report January 2016 60 U.S. CHEMICAL SAFETY AND HAZARD INVESTIGATION BOARD

exothermic reactions, detonation can occur. Conditions other than heat and pressure, such as pH levels and the presence of impurities, can also influence the rate of reaction.63 The decomposition of AN can be controlled to the extent that the main exothermic reaction (Eq. 1) can be used to produce hospital-grade nitrous oxide.64 However, if the rate of reaction is uncontrolled (which happens, for example, when FGAN is exposed to fire), other reactions can occur as AN decomposes and melts. As the temperature rises over 482°F (250°C), liquid AN becomes less dense and contains many small bubbles of gaseous decomposition products and their reactants, primarily water vapor and nitrous oxide. At 500°F (260°C), liquid AN becomes much more sensitive to shock because these bubbles act as “hot spots” that focus the shock or magnify the energy input. Many tests have shown the direct correlation between temperature and sensitivity in molten AN.65 In other words, molten AN becomes more sensitive as the temperature under which it is kept rises. Although the exact sequence of chemical reactions is variable, the primary end products of the detonation process are consistently water, nitrogen (N2), and oxygen (O2). As reactions involving nitric acid (HNO3) and ammonia (NH3) (Eq. 2) produce these end products, heat is released, which adds energy to a detonation. The nitrous oxide (N2O) production process (Eq. 1) combines all of the internal fuel (hydrogen) with the oxygen from nitric acid to form water, so no additional oxidation can take place in the pure AN during the detonation reaction. The difference between the uncontrolled detonation reaction and the nitrous oxide reactions is the rate of the reaction and the formation of the triple bond in N2 and the double bond in O2, which are exothermic and therefore add to the energy yield during detonation. The following formula (Eq. 3) describes this overall decomposition reaction from the intermediate reactions where AN yields nitrogen, oxygen, and water: NH4NO3 (s)  N2 (g) + ½ O2 (g) + 2H2O (g) (Eq. 3) When mixed with AN, many combustible contaminants—including organic materials, fuels, and finely divided materials (e.g., flour, seed or grain dusts, asphalt or fuel oil, or very small metal flakes)—will provide additional fuel that can combine exothermically with the oxygen produced during detonation. Thus, for explosive uses, AN is nearly always combined with a fuel source. This approach increases the energy of the intended explosion and also reduces the toxicity of the end products by reducing nitrogen

63 Lees, F.P., and M.L. Ang (eds.). Safety Cases Within Control of Industrial Major Accident Hazards (CIMAH) Regulations, Chapter 9. Butterworth-Heinemann, 1984; January 1, 1989: 160. 64 Asia Industrial Gases Association. Safe Practices for the Production of Nitrous Oxide from Ammonium Nitrate, AIGA 080/13. Singapore: Asia Industrial Gases Association, 2013. See: http://www.asiaiga.org/docs/AIGA%20080_13%20Safe%20practices%20for%20the%20production%20of%20nitro us%20oxide%20from%20ammonium%20nitrate.pdf (accessed on November 19, 2015). 65 Van Dolah, R.W. et al. Explosion Hazards of Ammonium Nitrate Under Fire Exposure. Washington, DC: U.S. Department of the Interior, Bureau of Mines, 1966. See: http://www.osmre.gov/resources/blasting/docs/USBM/RI6773ExplosionHazardsAmmoniumNitrateUnderFireExpos ure.pdf (accessed on December 22, 2015).

West Fertilizer Company Final Report January 2016 61 U.S. CHEMICAL SAFETY AND HAZARD INVESTIGATION BOARD

oxide (NOx) production. Nitrogen oxides are produced, for example, by the following reaction (Eq. 4), which shows AN yielding nitrogen, water vapor, and nitrogen oxides: 4NH4NO3 (s)  2NO2 (g) + 8H2O (g) + 3N2 (g) (Eq. 4) An example of fueling AN to produce a blasting agent is the addition of fuel oil at around 6 percent by weight to produce ammonium nitrate/fuel oil (ANFO). ANFO may be used for mining and other purposes. Moreover, the military uses a mixture of fuel-rich trinitrotoluene (TNT), AN, and sometimes aluminum to produce a more effective explosive than TNT alone.66 4.1.4 Previous Incidents Involving FGAN AN-related explosions have occurred ever since large-scale AN production began in the late 19th century.67 One of the earlier notable explosions involving FGAN took place in Oppau, Germany, in 1921, when workers fired explosives into a caked mixture of fertilizer to loosen 4,500 tons of ammonium sulfate (AS) and FGAN. The explosion killed 500 to 600 people, injured an additional 2,000 more, and caused as much as $1.7 million (US) in property damage, destroying 80 percent of the city.68 Today, that property damage would equate to more than $22 million.69 Since then, a number of other FGAN incidents have occurred that involved a major fire, explosion, or both. This report highlights the following four incidents involving FGAN because they provide important information about the behavior of FGAN when exposed to fire: • Cherokee incident (1973). A fire in the storage building of FGAN producer Cherokee Nitrogen resulted in an FGAN detonation in Pryor Creek, OK. Of the 14,000 tons of FGAN in storage, only a few tons were involved. The detonation was believed to have been underneath a front-end loader parked in an area with FGAN on the floor and might have been initiated by one of the loader’s components exploding. It was theorized that contamination of the FGAN with flammable fluids in the loader occurred before the detonation. The detonation occurred 25 minutes after the fire was discovered but did not propagate into the main pile.70 • Cory’s Warehouse incident (1982). A fire in a warehouse storing wooden furniture, charcoal, and more than 3,000 tons of bagged FGAN and mixtures based on FGAN produced some deflagration of the FGAN but no detonation.71 Several small explosions occurred but were thought to be due

66 Ibid. 67 Barbrauskas, Vytenis. “Explosions of Ammonium Nitrate Fertilizer in Storage or Transportation Are Preventable Accidents.” Journal of Hazardous Materials 304, 5 (2016): 134–149. 68See: http://www.aria.developpement-durable.gouv.fr/wp-content/files_mf/FD_14373_oppau_1921_ang.pdf (accessed on December 19, 2015). 69 The CPI Inflation calculator. See: http://data.bls.gov/cgi- bin/cpicalc.pl?cost1=1%2C700%2C000&year1=1921&year2=2014 (accessed on December 30, 2014). 70 Freeman, R. “Cherokee Ammonia Plant Explosion.” Chemical Engineering Progress 71, 11 (1975). 71 A deflagration occurs when a combustion wave propagates at a velocity less than the speed of sound. A detonation is a combustion wave that propagates at a velocity greater than the speed of sound. Detonations create high-pressure shock waves that can cause damage at large distances from the source.

West Fertilizer Company Final Report January 2016 62 U.S. CHEMICAL SAFETY AND HAZARD INVESTIGATION BOARD

to reactions between sodium nitrate and charcoal. More than 1,000 people were evacuated, and controlling the fire took 6 hours. • EDC incident (2009). A fertilizer distribution facility in Bryan, Texas, caught fire and completely burned. Firefighters withdrew and evacuated the area. Unlike the West fire, the Bryan AN-related fire produced light-colored smoke as burning progressed, indicating that the fire was ventilated. No explosion occurred, and after the fire, much of the FGAN was still there. Some of the FGAN melted, spread away from the pile, and then re-solidified in a dark mass. The FGAN remaining in the pile had a black crust on it, but beneath that crust, the prills appeared to be unaffected.72 • East Texas Ag Supply incident (2014). A fertilizer warehouse in Athens, Texas, caught fire and burned. The warehouse was near the center of town, and the first responders evacuated the area as rapidly as possible. No explosion occurred. The walls of the structure were masonry, but the bins and roof structure were wood.73

A more comprehensive list of FGAN incidents involving fires and explosions is provided in Appendix B. 4.1.5 Historical Knowledge of AN Fire and Explosion Hazards Over the years, the explosibility and fire hazards of AN have been the subject of a number of research papers. Some of those papers were first published through the U.S. Department of Agriculture (USDA),74 U.S. Bureau of Mines,75 and other sources abroad. In 1945, a USDA-archived publication discussed in detail the properties of pure AN, based on worldwide research conducted up to that date.76 The paper notes the following: • Under favorable conditions of pressure, rapid heating, and retention of heat, AN may be exploded partially from heat alone near 300°F. • AN can detonate if subjected to a very strong initial impulse. • Six factors influence the sensitivity of AN toward an explosion: temperature, strength of initial impulse, density, packing, particle size, and moisture content of the material. Later, the Bureau of Mines (U.S. Department of the Interior) published reports on its investigation of the detonation of AN.77 Some of the key findings of a 1966 Bureau of Mines report indicated the following: • No transition to detonation of AN occurred in numerous burning experiments.

72 CSB conducted an assessment of the Bryan, Texas, incident. 73 CSB collected information after the Athens, Texas, incident. 74 Davis, R.O.E. “Explosibility and Fire Hazard of Ammonium Nitrate Fertilizer,” no. 719. Washington, DC: U.S. Department of Agriculture, 1945. 75 Van Dolah, R.W. et al. “Explosion Hazards of Ammonium Nitrate under Fire Exposure,” R. I. 6773. Pittsburgh: Bureau of Mines, 1966. 76 See: https://ia601703.us.archive.org/1/items/explosibilityfir719davi/explosibilityfir719davi.pdf (accessed on January 6, 2016). 77 In 1961, the Manufacturing Chemists’ Association asked the Bureau of Mines to investigate the potential explosion hazards of AN under the conditions of fire exposure that could occur in storage and transportation incidents.

West Fertilizer Company Final Report January 2016 63 U.S. CHEMICAL SAFETY AND HAZARD INVESTIGATION BOARD

• The critical diameter (minimum diameter to sustain detonation) of AN was quite small when just below the melting point. • Initiation of prills by oxygen-acetylene gas detonation was shown to be unlikely. • Detonations were achieved with fuel added in vessels with restricted vents. • The initiation of detonation in AN from fire exposure in normal storage is quite improbable. • The chance of modern AN detonating as the result of fire has been considered to be small or even nonexistent. • The initial shock need not have an amplitude adequate for immediate initiation of detonation. • Failure to detonate at a small scale should not be interpreted as meaning that the material is incapable of detonation. • An acetylene-oxygen mixture in a 3-inch tube failed to detonate hot pulverized AN prills. No attempt was made to initiate detonation in foaming liquid AN by using a gas mixture. • Large fire tests with bagged AN showed that heat penetrated less than 2 inches into the prills and that a crust formed, preventing liquid from penetrating the prills.78 The Bureau of Mines conducted a large-scale study (also in 1966) to determine distances for safe storage of AN. Cardboard tubes 1 meter in diameter were used as the donors and acceptors (the donor is detonated conventionally, and the acceptor, which is placed at a test-determined distance from the donor, either detonates or fails in each test). ANFO was the donor, and the acceptors were ANFO and straight AN. The tests were well documented and were of sufficient scale to produce reliable results. One of the findings was that sheet metal covering the donor increased the distance where sympathetic detonation (a follow-on detonation induced by the explosive effects of an initiating explosion) occurred. In a case with ANFO as the acceptor, a sympathetic detonation was produced over a 50-foot gap. With straight AN, the maximum gap was 19 feet. Without the metal, the gap was 12 feet for AN. The Bureau of Mines also conducted tests at smaller diameters, but no detonation was initiated in AN. One significant finding was that “strong evidence exists that the apparent insensitiveness of AN results largely from a manifestation of critical diameter effects,” highlighting the importance of scale. When evaluating test results, small-scale tests are not reliable indicators of large-scale behavior. In December 1997, EPA published an alert, “Explosion Hazard from Ammonium Nitrate,” with the following recommendations:79 • Avoid heating AN in a confined space (e.g., consider that processes involving AN should be designed to avoid this possibility). • Avoid localized heating of AN, which potentially leads to development of high-temperature areas. • Ensure that AN is not exposed to strong shock waves from explosives.

78 Van Dolah, R.W. et al. “Explosion Hazards of Ammonium Nitrate under Fire Exposure,” R. I. 6773. Pittsburgh: Bureau of Mines, 1966. 79 See: http://nepis.epa.gov/Exe/ZyPDF.cgi/P100BH59.PDF?Dockey=P100BH59.PDF (accessed on November 19, 2015).

West Fertilizer Company Final Report January 2016 64 U.S. CHEMICAL SAFETY AND HAZARD INVESTIGATION BOARD

• Avoid contamination of AN with combustible materials or organic substances, such as oils and waxes. • Avoid contamination of AN with inorganic materials that can contribute to its sensitivity to explosion, including chlorides and some metals, such as chromium, copper, cobalt, and nickel. • Maintain the pH of AN solutions within the safe operating range of the process, in particular avoiding low pH (acidic) conditions. This alert was later expanded in August 2013 as a joint EPA, OSHA, and ATF advisory, “Chemical Advisory: Safe Storage, Handling, and Management of Ammonium Nitrate.” A June 2015 revision refers explicitly to AN prills.80 4.2 Factors Contributing to the Massive Fire and Explosion at the WFC Because of the unpredictable behavior of FGAN in fire situations, the scenario that contributed to the detonation at the WFC might never be precisely determined; however, several detonation scenarios are plausible. CSB identified two factors or conditions that likely contributed to the intensity of the fire and detonation: (1) the contamination of FGAN with materials that served as fuel and (2) the nature of the heat buildup and ventilation of the FGAN storage space. These factors and scenarios for how the FGAN behaved on the night of the incident are based on the physical evidence that remained, blast analysis commissioned by CSB, U.S. Army Corps of Engineers crater analysis of the WFC explosion, eyewitness accounts, and previous research on FGAN incidents and testing. 4.2.1 Contamination of the FGAN Pile In fire situations, the behavior of FGAN is unpredictable, in part because of the number of endothermic and exothermic decomposition reactions that take place with increasing temperature. FGAN decomposition reactions beyond the first step have yet to be uniquely defined, and subsequent decomposition reactions of FGAN can only be assumed.81 When contaminants are added to AN, the decomposition reactions become increasingly more complex.82 Possible sources of contamination in an FGAN storage area can include ignitable liquids, finely divided metals or organic materials, chloride salts, carbons, acids, fibers, and sulfides. These contaminants can increase the explosive sensitivity of FGAN.

80 EPA, OSHA, and ATF. “Chemical Advisory: Safe Storage, Handling and Management of Solid Ammonium Nitrate Prills.” See: http://www2.epa.gov/sites/production/files/2015-06/documents/an_advisory_6-5-15.pdf (accessed on December 7, 2015). 81 Cagnina, Stefania; Rotureau, Patricia; and Carlo Adamo. “Study of Incompatibility of Ammonium Nitrate and its Mechanism of Decomposition by Theoretical Approach.” Chemical Engineering Transactions 31 (2013). See: http://www.aidic.it/lp2013/webpapers/141cagnina.pdf (accessed on December 7, 2015). 82 Ibid.

West Fertilizer Company Final Report January 2016 65 U.S. CHEMICAL SAFETY AND HAZARD INVESTIGATION BOARD

The molten FGAN at the WFC likely came in contact with contaminants that were stored in the fertilizer warehouse or were produced during the fire that preceded the explosion. Seed materials, zinc, and other organic products, including the wood-constructed bins, were present near the FGAN storage area or could have come in contact with molten FGAN. During the fire, soot from the smoke and also collapsing wood and roofing material might have mixed with the FGAN pile. The presence of possible contamination in the FGAN pile can be evidenced by changes in the smoke observed in the WFC fire before the explosion. The earliest sign of the WFC fire was white smoke streaming from vents in the elevator cupola on top of the fertilizer warehouse that stored the FGAN. Light-colored smoke is evidence of a well-ventilated fire, which would be typical of the early phase of a structure fire before it depletes the oxygen in the room. The initial smoke observed at the WFC was from the incipient fire, now believed to have started in the seed room. Shortly after authorities were notified, the smoke darkened and became opaque, indicating large quantities of soot83 or hydrocarbons burning (Figure 38). Such soot can be the result of a ventilation-limited fire or a soot-producing fuel such as plastic or asphalt, which produces large amounts of soot even in well-ventilated fires.84 The fact that smoke was observed coming from the same room that held the FGAN bin suggests that the bin was burning at that time. It is likely that soot or molten asphalt began accumulating on the AN shortly after the fire spread to the roof and the FGAN bin. The soot provided a source of fuel as it contaminated the surface of the pile. Soot also greatly increases the absorption of radiant heat from a fire.85

Figure 38. Initial Light Smoke (left) Followed by Dark Plume (right) (Source: Member of the Public)

83 Soot is finely divided carbon deposited from flames during the incomplete combustion of organic substances. 84 Fire Development and Behavior Indicators. See: http://cfbt-us.com/pdfs/FBIandFireDevelopment.pdf (accessed on November 19, 2015). 85 Glassman, Irvin and Yetter, Richard. Combustion. Burlington, MA: Academic Press, 2009: 458.

West Fertilizer Company Final Report January 2016 66 U.S. CHEMICAL SAFETY AND HAZARD INVESTIGATION BOARD

  1. 2.2 Heating and Ventilation

As the fire progressed, the available oxygen in the building was depleted as it was consumed in the fire. Although the fertilizer warehouse structure had some ventilation louvers in the cupola at the top, ventilation at ground level was limited to only a few louvered vents and the normal infiltration that exists around doors. The limited ventilation increased the quantity of soot in the smoke and the potential contamination of the FGAN pile. The path of the fire from the seed room to the main structure is unknown, but an opening, perhaps resulting from an interior wall or the roof burning, seems to have allowed hot smoke and later flame to flow from the seed room into the main structure and out the cupola. Initially, no flames were visible at the cupola, but as the fire progressed, videos and photographs taken before the explosion show the fuel-rich smoke generated by the burning material inside the structure. Subsequently, asphalt roof shingles ignited and began burning vigorously. With limited ventilation inside the structure, a hot layer of smoke likely would have developed in the upper portion of the room containing the FGAN bin. Because cooler air settles below warmer air, the air temperatures would have remained relatively cooler inside the bin. The ground-hugging nature of the evolving smoke plume, as evidenced in Figure 39, is a characteristic of partially cooled smoke, perhaps cooling as it passed through the elevator structure before it exited the cupola. Because the elevator likely was filled with opaque black smoke, radiant heat from the fire on the FGAN pile would be reduced because the opaque black smoke shielded the pile from the heat.

Figure 39. Dark and Heavy Smoke, Rich in Soot (Source: Member of the Public) At some point around 5 to 6 minutes before the detonation, the character of the fire changed, according to eyewitness accounts and photographic evidence (Figure 40). This change was most likely caused by increased ventilation through an opening low in the building, possibly when the fire burned through the seed room doors or the roof. The fire also might have been enhanced by oxidizing gases from the heated FGAN pile.

West Fertilizer Company Final Report January 2016 67 U.S. CHEMICAL SAFETY AND HAZARD INVESTIGATION BOARD

Figure 40. Photographs from 7:42 pm (left) and 7:45 pm (right), Showing Transition to Lighter Smoke and Larger Flame, Before Detonation at Approximately 7:51 pm (Source: Member of the Public) The additional ventilation caused a marked decrease in dark smoke and probably was accompanied by a major increase in heat radiation inside the fertilizer building because of increased oxygen availability to the burning wood and other fuels. With the dark smoke inside of the structure reduced, radiant heat would reach the surface of the FGAN in the bin, and the increased airflow through the building would greatly increase the radiant heat flux by raising the temperature of the burning wood. The surface of the FGAN, covered with soot or molten asphalt, would absorb the heat flux and cause a very rapid heating of the surface of the FGAN pile. The very hot and contaminated surface of the pile was then sensitive to detonation. If the building had been well ventilated, the ventilation-limited phase of the fire would not have been as prolonged, reducing the amount of soot and creosote on the pile. In this scenario, the increased intensity of the fire would heat the FGAN pile. The lighter color smoke would allow more heat to be reflected, and the liquid FGAN might have run off as it developed. CSB collected data on similar incidents at the facilities in Bryan, Texas, and Athens, Texas. These incidents demonstrate that an FGAN pile can experience a major structure fire without detonating. The plumes of smoke at the Bryan facility (Figure 41) and Athens facility indicated cleaner-burning fires with less soot production. One source of the difference in the fire plumes might be the level of ventilation inside of the structure, as described to CSB investigators by the Athens fire chief. Some materials, such as asphalt and polyvinyl chloride (PVC), will

West Fertilizer Company Final Report January 2016 68 U.S. CHEMICAL SAFETY AND HAZARD INVESTIGATION BOARD

produce dark plumes even when burning in the open air, but if that smoke production is outside of the structure, no contamination of the FGAN will occur.

Figure 41. Plume of Smoke from AN Fire in Bryan, Texas (Source: College Station Fire Department) 4.3 Detonation Scenarios CSB found that contamination (likely from the storage of nearby combustibles or the combustible materials used to construct the FGAN bins and building) and the lack of ventilation were contributing factors that ultimately led to the detonation. However, the exact behavior of the FGAN—specifically how the contaminants, decomposition by-products, ventilation issues, or a combination of those conditions led to the explosion—may never be known. Previous studies indicated that a detonation of modern FGAN prills under normal standard storage conditions when exposed to fire (unconfined storage without the potential for pressure buildup) was highly unlikely based on a number of factors. Therefore, the three scenarios in this section are considered plausible, but large-scale testing is needed to estimate their relative likelihood. One of the three scenarios (or a combination) is considered plausible as an explanation of event sequences: • Scenario 1: Detonation from the top of the FGAN pile. • Scenario 2: Detonation in heated FGAN along exterior wall exposed to fire. • Scenario 3: Detonation in elevator pit that spread to main FGAN bin.

West Fertilizer Company Final Report January 2016 69 U.S. CHEMICAL SAFETY AND HAZARD INVESTIGATION BOARD

  1. 3.1 Scenario 1: Detonation from the Top of the FGAN Pile

Based on the location of the pile and the properties of the bin along with the circumstances of other fire- induced incidents, one possible scenario is that a period of contamination with soot and other organics (possibly including molten asphalt and plastic dripping from the burning composite shingle roof and PVC drop pipe from the elevator mechanism) was followed by about 5 to 6 minutes of intense radiant heating from the flames above and adjacent to the main FGAN bin. During this time, a layer of very hot, contaminated, and sensitive liquid FGAN could have built up on the pile. The foaming FGAN likely produced oxidizing gases, and those mixed with flammable smoke to produce a detonable gas cloud over the FGAN pile in the main bin and possibly in an adjoining bin linked to the main bin through a series of holes cut in the partition between the bins. The cloud consisted of powerful oxidizers that would be expected when FGAN undergoes thermal decomposition—such as NO2, O2, and HNO3 as wells as fuel- rich smoke and pyrolysis86 products off-gassing from the molten FGAN. The gas cloud then might have ignited from above, undergoing a gas-phase deflagration-to-detonation transition (DDT) in the confinement of the bin. This transition could have been enhanced by the passage of the burning front through the openings between the main and secondary bins, which possibly contained a few hundred pounds of FGAN, in a process known as hot gas injection.87 Given the powerful oxidizers and mixture of fuels possible in this environment, a direct gas-phase DDT in the partial containment of the main bin by itself might be another possible initiator. This gas detonation then initiated an explosive train on the surface of the pile (Figure 42), moving through the contaminated and sensitive low-density foam, into the mixture of high-density foam and prills beneath, and then into the ambient prills composing the bulk of the pile.

86 Pyrolysis is the chemical decomposition of a substance by heat. 87 Byers, Kenneth J. “Pressure Piling and Other Issues Affecting Flameproof Enclosures.” Redbank, Australia: Testing and Certification Centre, SIMTARS, 1996.

West Fertilizer Company Final Report January 2016 70 U.S. CHEMICAL SAFETY AND HAZARD INVESTIGATION BOARD

Figure 42. Potential Explosive Train Layers on AN Pile Before Detonation (Source: CSB) In tests using 1-meter (diameter) cardboard tubes, ambient temperature FGAN has been detonated by a 10-centimeter layer of ANFO at the end of the tube, initiated by a flat shock wave.88 If a large portion of the surface of the AN pile was detonated by a gas explosion and if the sensitized layer detonated, then the minimum diameter for unconfined FGAN prills (around 1 meter) would be exceeded, and the detonation could potentially proceed through the pile in a complete detonation. In many historical accidents, only part of the AN detonates because of the inability of the detonation wave to spread from a small detonation source into the main pile.89 This type of incomplete or partial detonation does not seem to have occurred at the WFC; the crater and blast damage indicate a complete detonation of the main pile, however it is unknown how much of the FGAN burned prior to the explosion. Falling material from a roof collapse has been proposed as a possible initiator in previous accidents, but subsequent testing of falling objects and high-speed projectiles entering solid and molten FGAN did not support this scenario. Although tests have shown that high-velocity impacts (such as those from high-

88 Winning, C.H. “Detonation Characteristics of Prilled Ammonium Nitrate.” Fire Technology 1, 1 (1965): 23. 89 Freeman, R. “Cherokee Nitrogen Co., Pryor OK.” Chemical Engineering Progress 71, 11 (1975).

West Fertilizer Company Final Report January 2016 71 U.S. CHEMICAL SAFETY AND HAZARD INVESTIGATION BOARD

caliber bullets) can detonate molten FGAN, the low velocities of falling objects do not appear to provide the energy density needed to detonate even sensitized FGAN.90 Fragments from a fire-induced explosion—such as the materials that might be produced in a hot steel roller with FGAN trapped inside—are another potential initiation source at the top of the pile but likely would not create the large flat shock wave required to fully detonate FGAN. No known vehicles or pressure tanks were close enough to the bin to produce high-speed fragments or a strong shock wave on the top of the FGAN pile. A golf cart was in the seed room, and fire extinguishers and an air conditioner could have failed from overpressure due to overheating, but they were separated from the FGAN bin by the substantial walls of the bin and are unlikely to have produced high-speed fragments. As other researchers have noted, the common element linking recent fire-induced FGAN detonations is some level of confinement.91 At the WFC building in West, the confinement was the wooden bin, whereas in the transportation accidents in Mexico and Romania cited in the reference, the confinement was the semitrailer. The confinement provided by a wooden bin or a trailer would not allow sufficient pressure to build up to support a solid-phase DDT92 but could allow the gases escaping the heated FGAN to accumulate over the pile. Additional field testing of this possibility would be useful. 4.3.2 Scenario 2: Detonation in Heated FGAN Along Exterior Wall Exposed to Fire Another possible scenario is that the detonation at the WFC facility was initiated along one of the exterior walls of the bin. The north and east sides of the bin were exposed to the fire and could have been heated through the walls. No evidence indicates that the bin failed during the fire, although that cannot be ruled out, so the side of the FGAN pile likely would have no direct contact with flame, but some heat could have penetrated through the wall of the bin—more heat if the exterior wall adjacent to the seed room was penetrated and fire entered the space between the exterior sheathing and the plywood bin lining. Figure 43 shows some of the features of the fire on the north side of the structure a few minutes before detonation. The structure above the bin had lost its siding and was burning with good air flow. Flames were appearing through the siding outside the bin, indicating that the wooden exterior sheathing and roofing were beginning to burn. The seed room was just a burning frame, and most of its roof had burned and collapsed.

90 Van Dolah, R.W. et al. Explosion Hazards of Ammonium Nitrate Under Fire Exposure. Washington, DC: U.S. Department of the Interior, Bureau of Mines, 1966. See: http://www.osmre.gov/resources/blasting/docs/USBM/RI6773ExplosionHazardsAmmoniumNitrateUnderFireExpos ure.pdf (accessed on November 19, 2015). 91 Nygaard, E.C. “Large Scale Testing of Ammonium Nitrate.” 4th EFEE World Conference of Explosives and Blasting 4(1), 2007. 92 Van Dolah, R.W. et al. Explosion Hazards of Ammonium Nitrate Under Fire Exposure. Washington, DC: U.S. Department of the Interior, Bureau of Mines, 1966. See: http://www.osmre.gov/resources/blasting/docs/USBM/RI6773ExplosionHazardsAmmoniumNitrateunderFireExpos ure.pdf.pdf (accessed on December 22, 2015).

West Fertilizer Company Final Report January 2016 72 U.S. CHEMICAL SAFETY AND HAZARD INVESTIGATION BOARD

Figure 43. North Side of Structure Approximately 3 Minutes Before Detonation, with Dark Foreground Objects Associated with the Bin Complex North of Fertilizer Building (Source: Member of the Public) Even with some heating of the pile through the bin wall, it is difficult to envision a potential detonation source; FGAN does not normally detonate when heated except under severe confinement.93 Contamination also would be less likely in the FGAN exposed to heat along the exterior seed room wall, but some liquid AN, contaminated by soot and roofing components, on the pile surface might have penetrated along the heated wall of the bin if the temperature was high enough or the wall was partially breached. A small amount of wood from the bin also might be nitrated by nitric acid off-gassing from the heated FGAN to form nitrocellulose, but such a reaction has not been observed in testing, and no research papers supporting such a scenario were found. The WFC facility had a concrete floor that would have prevented heating of the pile from the bottom. Bin failure, preceded by leakage of the FGAN or FGAN liquid onto burning material such as seed or plastic cannot be ruled out. Because the bin floor was well above the floor of the seed room, the falling material would have some momentum and could produce

93 Arthur D. Little, Inc. Study of Ammonium Nitrate Materials. Springfield, VA: National Technical Information Service, 1952: 1–49. See: http://www.dtic.mil/dtic/tr/fulltext/u2/786334.pdf (accessed on November 19, 2015).

West Fertilizer Company Final Report January 2016 73 U.S. CHEMICAL SAFETY AND HAZARD INVESTIGATION BOARD

significant pressure under ideal conditions. Whether this situation could lead to a detonation is an open question. 4.3.3 Scenario 3: Detonation in Elevator Pit That Spread to Main FGAN Bin Another possible detonation scenario focuses on the elevator pit near the FGAN bin. A fiberglass lid covered the pit, and the floor sloped away from the pit to prevent runoff from entering it, but the fire might have melted the cover, and FGAN remnants could have been in the pit. The typical elevator mechanism would not provide any areas for strong confinement leading to high pressures, nor does it seem plausible that a small detonation in the pit could have initiated the main FGAN pile. If the detonation began in the pit, then the most feasible mechanism would be a collapse of the west wall of the bin, spilling FGAN into a mixture of burning rubber from the melted elevator belt and residual FGAN in the bottom of the pit. The mass of the falling FGAN, combined with the strong confinement of the concrete pit walls, might have provided the conditions for a solid phase DDT beginning in the bottom of pit and spreading into the main pile. The likelihood of sufficient FGAN near the door, where the pit was located, seems quite low. Liquid FGAN, if it somehow leaked into the pit, would have been under confinement conditions similar to those for liquid in the bin, with no obvious areas where pressure could build. The elevator itself is a belt with cups protected by a sheet metal box open at the top and bottom. The belt that brought the material in from the unloading pit outside provides no obvious containment other than the rollers, which are often hollow metal. Unlike the rollers above the bin, these rollers would have been shielded from the heat of the main fire but could have been heated by a fire (if it existed) in the pit. Molten and contaminated FGAN on the floor, initiated by an explosion from a burning loader, was suspected in the 1973 Cherokee FGAN storage explosion, but no known source of an initiating detonation existed at the WFC, and the detonation at Cherokee did not propagate into the main pile. The circumstances of the two accidents were too different to draw any firm conclusions about the role of molten AN in the detonations. Other fires involving FGAN (such as the fires in Bryan, Texas, and Athens, Texas) did not result in detonation, even though the fires totally consumed the structures housing the FGAN bins and the roofs collapsed. This evidence demonstrates the unpredictable behavior of FGAN exposed to fire. Possible differences between the fire incidents and the WFC are ventilation of the fire, which determines the degree of contamination from smoke products; level of confinement in the bin; and degree of direct heating on the FGAN pile. 4.4 Forensic Testing of West Fertilizer Company Samples On the day before the explosion, the WFC sold 8,000 pounds of an FGAN/AS blend of fertilizer to a farmer in Abbot, Texas. The farmer told CSB investigators that the fertilizer he received, which he estimated was about 75 percent FGAN and 25 percent AS, was dustier than usual during spreading. After

West Fertilizer Company Final Report January 2016 74 U.S. CHEMICAL SAFETY AND HAZARD INVESTIGATION BOARD

the incident, the Office of the Texas State Chemist (OTSC) retained a portion of the fertilizer and provided a sample to CSB for further testing. The OTSC is part of the Texas A&M University System and administers the requirements of the Texas Feed and Fertilizer Control Service. The OTSC regulates the sale of fertilizer and also conducts laboratory testing of FGAN to ensure that it meets quality guidelines for fertilizer. The OTSC conducted testing of the samples and shared the results with CSB. The OTSC spectral analysis found no activated carbon or any evidence of contamination of the FGAN sample. According to the report, the testing concluded that the sample was a mixture of FGAN and AS. The OTSC ran a nitrogen analysis in the state’s combustion laboratory; this is a routine test run by the OTSC to check the concentration of nitrogen in fertilizers. The OTSC determined that the amount of nitrogen contained in the FGAN/AS sample mixture had nitrogen percentages that ranged from 34.33 to 34.61 percent.94 The laboratory also conducted tests to determine the particle size distribution of the prills in the farmer’s FGAN/AS sample. Results verified that the FGAN/AS samples had high concentrations of fines (smaller broken-down prills). Approximately half (50 to 55 percent) of the farmer’s sample consisted of particles smaller than 200 micrometers (0.2 millimeters). Operating under the assumption that the farmer’s sample was a blend of FGAN and AS prills, the laboratory obtained a control sample of FGAN and AS mixed in 70:30 portions, respectively. The control sample contained 10 percent particles smaller than 200 micrometers. Although the farmer’s sample included a larger than usual number of fines, the particle sizes in this sample are not necessarily representative of the FGAN in the main bin at the WFC because of the addition of AS to the farmer’s mixture. Mechanical action such as blending might have taken place when creating the FGAN/AS mixture, reducing the particle size, and further breakage might have occurred during transit. CSB investigators collected samples of the fertilizer remaining at the WFC facility and the OTSC and in March 2015 commissioned a forensics laboratory to characterize the composition of eight samples by semi-quantitative analysis. Samples 1 through 5 were categorized as solidified and pulverized fertilizer collected from various bins (Figure 44); sample 6 was collected from the FGAN railcar on the WFC property that was the least disturbed by the explosion and firefighting efforts (Figure 45); and samples 7 and 8 were collected from the FGAN mixture purchased by the farmer on the day before the incident (Figure 46). According to shipment records, the railcar contained pure FGAN manufactured by CF Industries. The railcar arrived at the WFC site in early April 2013. At the time of the incident, the WFC had not yet unloaded the railcar. The WFC also received truckloads of EDC pure FGAN product in early April 2013. CSB is unable to conclude whether the CF Industries or EDC product, or a mixture of both, was present in the FGAN main bin at the WFC facility at the time of the explosion.

94 The percent of nitrogen (34 percent minimum) is typical for a high-density FGAN prill.

West Fertilizer Company Final Report January 2016 75 U.S. CHEMICAL SAFETY AND HAZARD INVESTIGATION BOARD

Figure 44. Solidified Fertilizer Collected from WFC Property (Approximate Location Unknown) (Source: Forensic Laboratory)

Figure 45. FGAN Prills Collected from a Railcar on WFC Property (Source: Forensic Laboratory)

Figure 46. Farmer’s Sample of FGAN and AS Blend (Source: Forensic Laboratory)

West Fertilizer Company Final Report January 2016 76 U.S. CHEMICAL SAFETY AND HAZARD INVESTIGATION BOARD

The laboratory used infrared spectroscopy and electron microscopy methods to determine the elemental compositions of each sample. Results of this testing confirmed the presence or absence of AN and other salts in some of the samples. Four of the eight samples (1, 2, 3, and 5) contained no FGAN (Table 4). The sample collected from the railcar (no. 6) was determined to contain wholly AN with 36 percent95 nitrogen and had a prill density of 1.59 grams per cubic centimeter (g/cm3).96 The railcar sample consisted of prilled particles with a polyolefin coating, which is commonly applied to reduce caking.97 Magnesium nitrate or magnesium oxide is also occasionally used as an additive to FGAN prills during the manufacturing process.98 The purpose of the additive is to act as a desiccant (absorbs moisture) and also to protect against the breakdown of prills at higher temperatures.99 CSB concluded that the chemical composition of the FGAN obtained from the rail car (no. 6) was typical of FGAN prills commonly used for fertilizer and for creation of fertilizer blends.

Table 4. Forensic Testing Results of Fertilizer Samples Collected from the WFC and the OTSC

95 FGAN prills typically contain about 34 percent nitrogen. The 36 percent nitrogen result in the sample is likely attributed to the percent error in the analytical method used. The laboratory conducted a linear regression analysis to determine the percentage error in the determination of elemental sulfur in the FGAN/AS samples compared to a control sample, and it estimated the error to be within +/- 0.3 percent of the sample. The laboratory concluded that the percentage error estimates would be similar for oxygen and nitrogen in the samples that underwent electron dispersive spectroscopy (EDS) methods. 96 FGAN is a higher-density prill in the range of 1.72 g/cm3. 97 According to the FGAN Safety Data Sheet (SDS) from CF Industries, the FGAN prills contain a 0 to 0.2 percent proprietary polyolefin conditioning agent. 98 Ammonium nitrate particulate fertilizer and method for producing the same. See: http://www.google.com/patents/US5720794 (accessed on November 25, 2015). 99 U.N. Industrial Development Organization. Fertilizer Manual, 3rd Edition. The Netherlands: Kluwer Academic Publishers, 1998: 227. No. Sample Location (if known) Sample Description Detected Compounds FGAN Detected 1 Unknown White and pink encrusted and prilled layers AS, magnesium phosphate (with iron), potassium sulfate No 2 Ammonium phosphate/potassium chloride bin White prilled particles, pink fragmented particles, and grey encrusted particles AS, ammonium phosphate, and possibly potassium chloride No 3 Space between FGAN and potassium chloride bins Dark pink fragments Ammonium phosphate, sulfate, alkali salts of fluoride, trace iron No 4 Backside of diammonium phosphate bin White powder with red streaks AN, AS, chlorides, ammonium phosphate, and trace amounts of potassium chloride Yes

West Fertilizer Company Final Report January 2016 77 U.S. CHEMICAL SAFETY AND HAZARD INVESTIGATION BOARD

The FGAN/AS mixture purchased by the farmer on the day before the incident was the only available sample representative of materials stored in the fertilizer building before the incident. In addition to the testing conducted by the OTSC to determine the percentage of nitrogen and quantity of fine in these samples, CSB commissioned additional laboratory testing of the prills contained in the FGAN/AS mixture (samples 7 and 8 in Table 4) in October 2015. Because the FGAN sample from the railcar on the WFC property remained relatively undisturbed during the fire and explosion, the laboratory also selected a prill from that sample (no. 6 in Table 4) for comparison. An image from a macroscopic examination of an individual prill from sample items 6, 7, and 8 is shown in Figure 47. Item 6, which was collected from the railcar, had a smooth and uniform coating-like texture, whereas evidence items 7 and 8, which were sampled from the farmer’s mixture, had an uneven surface made up of an agglomeration of amorphous (formless) and semicrystalline particles.

Figure 47. Physical Comparison of Samples (20x) (Source: Forensic Laboratory) 5 Backside of ammonium sulfate bin Sample containing gravel and pebbles (separated before analysis) AS, sulfates, and chlorides No 6 Railcar White prilled particles Prilled AN coated with polyolefin Yes 7 Farmer AS/FGAN mixture White prilled particles (partially agglomerated from wetting) AN, AS, sulfate, extractable polyolefin Yes 8 Farmer AS/FGAN mixture White prilled particles AN, AS, sulfate, extractable polyolefin Yes

West Fertilizer Company Final Report January 2016 78 U.S. CHEMICAL SAFETY AND HAZARD INVESTIGATION BOARD

Under a microscope, the polyolefin coating was visually apparent on the surface of the item 6 prill. Through infrared spectral analysis, the laboratory was able to chemically identify the external prill coating as a polyolefin. However, the external polyolefin coating on the surface of sample items 7 and 8 could not be identified through the same analysis. To determine whether a coating had been present, the laboratory quantitatively extracted residues from the prills in a solvent that could be analyzed through infrared spectra analysis. Although direct surface scans of items 7 and 8 did not reveal the presence of the coating, solvent extracts indicated the presence of a polyolefin. This coating could have been applied to the prills at some point in time but was no longer acting as a prill coating on the observed sample items 7 and 8. 4.5 Blast and Impact Analysis CSB commissioned a consultant firm to survey the property damage to the WFC and the surrounding community. On the basis of information obtained from the survey, the consultants characterized the force of the blast and estimated the energy produced during the explosion. Using indicators from the observed damage to residences and community structures, the consultants applied a guideline100 from the U.S. Army Corps of Engineers and created a three-dimensional model to predict the blast overpressure and determine the explosive weight that was best explained by the physical damage observed in West, Texas. The computational models and calculations expressed the AN explosive energy estimation normalized against the explosive power of TNT,101 a high-explosive compound commonly used to quantify blast loads. A TNT equivalence calculation provides an approximation of explosive energy in pounds of TNT. Several TNT equivalent equations are used in industry that employ actual and estimated explosion parameters such as heat capacity, weight of explosive charge, and explosion percent efficiency. Many of the parameters are specific to the material involved. TNT equivalent values are a rough approximation of explosive effects, and the variability of TNT equivalence (20 to 40 percent) might be a result of the ways that it is calculated based on pressure, impulse, crater size, or other damage measures.102 The blast modeling consultants estimated the range of potential explosive yields from the WFC explosion to be equivalent to a range of 20,000 to 40,000 pounds of TNT, based on the blast damage indicators recorded and analyzed from 20 lightweight metal buildings, the deformed basketball goalposts, and the condition of the apartment complex and nursing home. To further refine a specific explosive weight most consistent with all of the observed damage, the consultants used another modeling tool that incorporates a number of different blast prediction methodologies, including the development of a computational fluid dynamic simulation to characterize the shock wave as it wrapped around structures and other obstacles during the explosion. The CSB-

100 U.S. Army Corps of Engineers. “Estimating Damage to Structures from Terrorist Bombs Field Operations Guide,” ETL 1110-3-495. Washington, DC: U.S. Army Corps of Engineers, 1999. 101 One ton of TNT has an explosive energy of 4.184 gigajoules. 102 National Assessment Group. “Ammonium Nitrate Detonability Review and Assessment, Final Report.” Prepared for the Technical Support Working Groups, For Official Use Only. Kirtland AFB, NM: September 2, 2011: 7.

West Fertilizer Company Final Report January 2016 79 U.S. CHEMICAL SAFETY AND HAZARD INVESTIGATION BOARD

commissioned blast experts determined that the explosive energy of the WFC explosion that is most consistent with the observed damage is 25,000 pounds (12.5 tons) of TNT. With an estimated 30 tons of FGAN in the main WFC bin at the time of the blast, the 12.5-ton TNT equivalent is based on a 42 percent efficiency of the material that contributed to the explosive energy. Because the quantity of FGAN consumed in the fire before the explosion was not determined, the exact quantity of FGAN that contributed to the explosion remains unknown. The ATF National Response Team also requested that the U.S. Army Engineer Research and Development Center (ERDC) conduct an assessment of the WFC explosion damage and then estimate the equivalent explosive yield of the blast. The ERDC team arrived in West on April 29, 2013. As part of the site study, the ERDC team conducted a detailed survey of the crater left by the explosion (Figure 48), using survey and three-dimensional scanning equipment to verify critical dimensions. The shape of the crater was asymmetric, with an apparent diameter of 75 feet and a depth of nearly 8 feet (Figure 49).

Figure 48. Ground-Level View of WFC Explosion Crater (Source: CSB)

West Fertilizer Company Final Report January 2016 80 U.S. CHEMICAL SAFETY AND HAZARD INVESTIGATION BOARD

Figure 49. WFC Explosion Crater Profile Measurements (Source: Army Corps of Engineers) The ERDC team compared the field crater measurements with experimental data for blast craters and other sources to produce an estimate of the net explosive weight of the FGAN. The experimental data also took into consideration the near-surface geology (soil type and underlying rocks) surrounding the explosion, which has an effect on the crater depth and size. The ERDC team compared the crater dimensions and soil types from the WFC explosion with similar experimental data to estimate the explosive weight of FGAN. The final report on this analysis concluded that this method entails a degree of uncertainty because none of the experimental data included the type of soil with limestone found in Texas.103 In addition, the experimental charge was C-4, which might have a different explosive or cratering efficiency than FGAN. The ERDC team made assumptions to account for the lack of available data and, on the basis of the crater analysis, estimated the WFC explosion to be within the range of 10,000 to 21,500 pounds of TNT. The center of the crater was almost directly under the WFC facility’s main FGAN bin, which was likely the source of fuel for the explosion. This main bin contained an estimated 20 to 30 tons of FGAN at the time of the incident; however, the blast analyses from consultants hired by CSB and from the Army Corps of Engineers indicate that the quantity of FGAN that contributed to the explosion could have been smaller, based on the observed damage. To demonstrate the location of the crater in reference to the fertilizer storage building and the main FGAN bin, CSB commissioned a structural engineering firm to create a three-dimensional rendering of the fertilizer facility over the crater location (Figure 50).104 Figure 51 shows an elevation view of the fertilizer building, with the underlying crater.

103 The soil at the WFC consists of limestone with varying amounts of chalk and clay. This soil type is consistent with what would be expected in West, Texas. 104 Crater and building location are estimated to be within +/- 2 feet, based on global positioning information.

West Fertilizer Company Final Report January 2016 81 U.S. CHEMICAL SAFETY AND HAZARD INVESTIGATION BOARD

Figure 50. Overhead View of WFC Bins, with Crater Underlay (Source: Atlas Engineering)

Figure 51. Elevation View of Fertilizer Building, with Crater Depth (Source: Atlas Engineering) 4.5.1 Seismic Data According to the United States Geological Survey (USGS), the WFC explosion registered as an earthquake of magnitude 2.1 on the Richter scale. The Lake Whitney seismic station in Meridian, Texas, about 25 miles west-northwest of the WFC site, recorded seismic signals from the April 17, 2013, explosion. ATF concluded that there were two separate explosions, “one smaller and one larger,” based

West Fertilizer Company Final Report January 2016 82 U.S. CHEMICAL SAFETY AND HAZARD INVESTIGATION BOARD

on eyewitness accounts and seismic evidence.105 After conversations with USGS seismologists, CSB later learned that a system error occurred, and only one event was recorded at the Lake Whitney station. According to USGS, seismic signals resulting from the WFC explosion were recorded on nine seismic stations within a range of 25 to 360 miles. Using the onset time of the seismic energy at these stations and the known location of the explosion, the USGS National Earthquake Information Center estimated that the time of the explosion was 7:50:38 pm local time. According to USGS, the seismic data recording shows both energy that propagated through the earth as well as later-arriving energy that propagated through the air (Figure 52). USGS concluded that the event was a single large explosion, but it could not rule out the possibility of multiple closely timed explosions.

Figure 52. Data Recorded at Lake Whitney Station, WHTX, and Seismograph by the USGS National Earthquake Information Center (Source: USGS) 5.0 Commercial Property and Liability Insurance The West Fertilizer Company (WFC) had commercial property insurance to cover losses (such as building damage, damage to product, or loss of income due to property damage) from certain loss events, such as fires. The company also held a commercial liability insurance policy to protect itself against claims for bodily injury while onsite or while operating company automobiles. CSB examined available documentation of the WFC’s insurance coverage and inspections from 2007 until the April 2013 explosion. The WFC was insured by two different insurance companies, Triangle Insurance Company,

105 ATF. “ATF Press Conference Video,” May 16, 2013, minute 12:45. See: http://www.youtube.com/watch?v=OpLjSvcRqzU (accessed on November 19, 2015).

West Fertilizer Company Final Report January 2016 83 U.S. CHEMICAL SAFETY AND HAZARD INVESTIGATION BOARD

Inc. (Triangle) and the United States Fire Insurance Company (U.S. Fire). Triangle issued policies that included coverage for property damage, business interruption, bodily injury, and automobile accidents from 2007 to the end of 2009. In late 2009, Triangle decided not to renew the insurance policy because of the WFC’s lack of compliance with loss control recommendations. The WFC insurance policy expired on December 31, 2009. Thereafter, the WFC obtained similar coverage from U.S. Fire in January 2010 and renewed it in 2011, 2012, and 2013. The U.S. Fire insurance policy was in effect at the time of the 2013 explosion. 5.1 Triangle Insurance Coverage and Audits (2006–2010) Triangle conducted an initial onsite survey of the WFC facility in 2006 and provided insurance coverage from 2007 until 2010. The WFC had a $1 million commercial general liability policy and $2 million in coverage to cover onsite property and business losses. In 2009, Triangle gave notice to the WFC that it was not renewing the policy because of the WFC’s lack of compliance with loss control recommendations issued by Triangle following several onsite audits. Triangle conducted annual loss control surveys at the WFC facility from 2006 through 2009, and it issued a number of recommendations for suggested improvements to WFC operations. The Triangle loss control surveys included an evaluation of WFC automobiles and drivers, storage and application of dry and liquid fertilizers, grain and feed milling, and anhydrous ammonia. CSB investigators requested and reviewed insurance documentation from Triangle, including risk profiles, insurance audit reports, and communications from Triangle to the WFC. In 2006, Triangle performed an initial survey of the WFC facility before issuing coverage. Triangle loss control specialists made four recommendations to the WFC for safety improvements, including replacing missing guards on augers and conveyors and addressing visual damage to one of the grain bins. Triangle’s overall risk assessment categorized the facility as average, with housekeeping, maintenance, and grounds in average to fair condition. During the anhydrous ammonia survey, Triangle noted the close proximity of the WFC facility to schools, residences, and businesses and also documented concerns about the ammonia risk management plan (RMP) being out of date (discussed in Section 8.4.2.4). Triangle assigned a representative to work with the WFC to update and improve the RMP submission. In 2007, Triangle conducted another loss control survey and submitted 10 recommendations to the WFC; 4 of the 10 recommendations were restated from the 2006 survey because they remained unresolved. The loss control specialist identified several safety and compliance issues, including: • A corroded 440-volt wire ran from the pole on the north side of the plant through the bulk fertilizer facility to the anhydrous ammonia tank area on the south side of the facility. • An aluminum ground wire showed noticeable signs of corrosion from the fertilizer. The loss control specialist noted that the wire could lose its ability to ground, potentially causing shock and fire hazards (Figure 53). • Several temporary lighting sockets needed to be wired in permanently to reduce the potential for electrical shocks and fire hazards.

West Fertilizer Company Final Report January 2016 84 U.S. CHEMICAL SAFETY AND HAZARD INVESTIGATION BOARD

About 2 months later, the WFC responded to some of the Triangle recommendations and reported that 3 of the 10 recommendations were resolved, including replacing guards and repairing an electrical cord on an auger. The remaining seven recommendations, including the exposed 440-volt wire, remained outstanding. The Triangle loss control specialist’s overall opinion of risk, documented from this survey, was fair; housekeeping received a fair rating; and maintenance received a fair to poor rating.

Figure 53. Exposed 440-Volt Electrical Wiring Identified in 2007 Survey (Source: Triangle Insurance Company) In September 2008, a loss control specialist from Triangle conducted another renewal survey and made 14 recommendations, including several outstanding recommendations from the previous year. During this survey, Triangle identified additional damaged electrical wires at the facility in need of repair (Figure 54). The WFC submitted a completed recommendation form to Triangle later that month, stating that seven recommendations were addressed or in the process of being settled.

West Fertilizer Company Final Report January 2016 85 U.S. CHEMICAL SAFETY AND HAZARD INVESTIGATION BOARD

Figure 54. Damaged Electrical Cord Identified in 2008 Insurance Survey (Source: Triangle Insurance Company) In August 2009, Triangle identified six additional recommendations during the annual loss control survey. One recommendation was restated and designated as “critical” for a lack of safety chains on towing equipment. The Triangle consultant also noted that the WFC “seems to be resistant” to implementing a training program to address the frequency of vehicle and mobile equipment accidents. Triangle documented a large quantity of temporary exposed wiring in the WFC facility that needed to be run in conduits. When evaluating WFC safety programs in 2009, Triangle noted that the company had no positive safety culture and that “written programs are incomplete and outdated, there is no structured safety program.” In addition, Triangle found no accident investigation program and no evidence that the WFC held regular safety meetings for employees. The following excerpt from the 2009 survey indicates Triangle concerns: They need a SCMP (Safety and Compliance Management Programs) person to help them with safety issues, permits, etc. To my knowledge they have not had a safety meeting since we started insuring them in 2006…I have a concern with the wiring at both grain operation & the dry fertilizer plant. Only about 10% is run in conduit. The rest consist of a heavy flexible 4-wire cable, the type you would normally use to put outside on poles but it is not protected from cuts & abrasion.106 In September 2009, the loss control specialist stated in an internal Triangle email that “because of losses and non-compliance of recommendations, Triangle should non-renew Adair Grain, Inc./West Fertilizer Co. in West, Texas.”107 In September 2009, Triangle sent notification to the WFC that all policies would not be renewed for the following year. In 2010, the WFC retained U.S. Fire for insurance coverage.

106 Triangle Insurance Company Documentation, Loss Control Survey at Adair Grain/WFC. August 2009. 107 Triangle Representative. “Adair Grain,” email message to manager, Underwriting Services Triangle, September 14, 2009.

West Fertilizer Company Final Report January 2016 86 U.S. CHEMICAL SAFETY AND HAZARD INVESTIGATION BOARD

  1. 1.1 Triangle Loss Control Surveys That Did Not Include FGAN Hazards

CSB reviewed the WFC loss control survey documentation and the Triangle “Loss Control Best Practice Manual” for insurance inspectors and found no focus on FGAN fire and explosion hazards between 2006 and 2009. In the 2006 survey and subsequent surveys, Triangle documented the presence of ammonium nitrate (AN) onsite for security concerns and answered, “Yes” to the question, “Does the account meet state regulations for the storage and transportation of product?” Although no state-specific regulations for AN storage existed at the time, the survey did not include federal regulations, such as the OSHA Explosives and Blasting Agents standard (29 CFR 1910.109, discussed in Section 8.2), or industry consensus standards, such as National Fire Protection Association (NFPA) 400, Hazardous Materials Code (addressed in Section 8.6.1). Triangle guidance included a description of combustible and noncombustible bulk fertilizer storage buildings for informational purposes, but Triangle did not provide guidelines or requirements for specific storage practices, such as separation from potential contaminants, materials of construction, or mechanism for fire and explosion prevention. Other survey focus areas, such as grain milling and anhydrous ammonia, included a more detailed review of federal requirements, such as the OSHA Grain Handling Facilities Standard (29 CFR 1910.272) for the prevention of grain dust explosions and the EPA Risk Management Program rule for anhydrous ammonia storage. In November 2013, Triangle updated the best practice manual to include compliance with federal regulations in addition to state regulations for fertilizer storage and transportation. 5.2 U.S. Fire Insurance Coverage and Audits (2010–2013) U.S. Fire started providing insurance to the WFC in 2010 and renewed coverage for 2011, 2012, and

  1. The WFC was insured by U.S. Fire at the time of the April 2013 incident. The WFC general

liability policy had a maximum limit of $1 million, and the commercial property insurance policy had a limit of about $4.45 million, which included all buildings and equipment on the WFC property. In 2013, the WFC held U.S. Fire coverage for commercial property, general liability, inland marine,108 and commercial automobile. According to the insurance policy documentation for the WFC, U.S. Fire offered policyholders a loss control service that included onsite surveys of the facility to provide: • Safety information and educational material to minimize loss costs. • Initial survey and evaluation. • Specific suggestions for improving loss control practices. • Consultation and training to help management understand hazards associated with operations. • Follow-up surveys.

108 Commercial inland marine insurance covers property in transit or property that is movable or portable and is not at a fixed location.

West Fertilizer Company Final Report January 2016 87 U.S. CHEMICAL SAFETY AND HAZARD INVESTIGATION BOARD

CSB requested additional information from U.S. Fire related to the WFC insurance policy, including claims, audits and inspections, and training requirements for U.S. Fire loss consultants. CSB also requested documentation of U.S. Fire’s onsite inspections at the WFC facility over the time period it was insured. To date, U.S. Fire has not provided CSB with the requested documentation. Outside counsel for U.S. Fire indicated to a CSB investigator that the $1 million policy amount did not necessitate much onsite activity, such as audits or inspections, during the time that the WFC was insured. 109 5.3 Insurance Claims and Other Aid after the Explosion The Texas Department of Insurance (TDI) regulates the business of insurance in Texas and provides resources for people and businesses to obtain insurance in the state. In response to the WFC explosion, TDI assisted in securing the scene and mobilizing a disaster response program to assist consumers with filing insurance claims related to the incident. The Texas State Fire Marshal’s Office (SFMO) and the Division of Workers’ Compensation are units within TDI. The total insurance-related losses due to the explosion are estimated to be in the range of $230 million.110 Many of the residents in the area did not have home or rental insurance. Those individuals relied on aid from FEMA, Salvation Army, and American Red Cross operations. FEMA received a total of 1,108 applications for assistance as a result of the fire and explosion at the WFC facility.111 Nearly 6 months after the incident, FEMA112 reported providing federal disaster assistance exceeding $16 million to eligible survivors. This sum included more than $9 million in federal disaster loans from the U.S. Small Business Administration (SBA), nearly $840,000 in individual assistance grants from FEMA, and more than $6.2 million in FEMA Public Assistance funding.113 Low-interest disaster assistance loans from the SBA114 were also available to homeowners, renters, businesses of all sizes, and private nonprofit organizations whose property was damaged or destroyed by the incident. On the basis of data provided by FEMA, 580 applications were submitted for individuals or families that had homeowners, homeowners with small business loans, and mobile home insurance. FEMA verified losses totaled about $9,052,308. The real property FEMA verified losses amounted to about $8,145,750. The personal property FEMA verified losses totaled roughly $906,557. Although all losses related to the fire and explosion totaled nearly $250 million, the

109 Outside Counsel for U.S. Fire, conversation with CSB Investigator, January 20, 2015. 110 Texas House of Representatives, 84th Texas Legislative Session. Testimony on House Bill 2470. See: http://www.house.state.tx.us/video-audio/committee-broadcasts/ (accessed on January 6, 2016). 111 Official data provided by FEMA. 112 FEMA—under the authority of Section 408 of the Robert T. Stafford Disaster Relief and Emergency Assistance Act, 42 U.S.C. § 5174, and Title 44 of the Code of Federal Regulations (CFR)—may provide financial assistance and, if necessary, direct services to eligible individuals and households that, as a direct result of a major disaster, have necessary expenses and serious needs and are unable to meet such expenses or needs through other means. 113 See: http://www.fema.gov/news-release/2013/10/07/federal-disaster-assistance-tops-16-million-west-texas (accessed on January 6, 2016). 114 The SBA serves as the Federal government’s primary source of money for the long-term rebuilding of disaster- damaged private property. These disaster loans cover uninsured and uncompensated losses and do not duplicate benefits of other agencies or organizations.

West Fertilizer Company Final Report January 2016 88 U.S. CHEMICAL SAFETY AND HAZARD INVESTIGATION BOARD

WFC carried a policy from U.S. Fire at the time of the incident with a limit of only $1 million for bodily injury and offsite property damage. 5.4 FGAN Facilities in Texas and the Potential for Offsite Consequences Under the Texas Commercial Fertilizer Rule (described in Section 8.7.1), facilities that sell or offer to sell FGAN or FGAN-containing materials must obtain annual registrations from the Office of the Texas State Chemist (OTSC) to do business. The OTSC collects information on each facility storing more than 10,000 pounds (5 tons) of AN in Texas. According to the OTSC list of facilities as of September 2014, 80 facilities statewide stored AN in quantities exceeding 10,000 pounds. Of those 80 facilities, 43 stored FGAN, and 37 stored technical grade ammonium nitrate (TGAN). In October 2015, the OTSC reported 40 FGAN facilities in Texas.115 Of those 40 facilities, only nine (23 percent) are located in jurisdictions with an adopted fire code. CSB found that West, Texas, is not the only town in the state with FGAN storage in close proximity to residential areas, schools, and hospitals. In fact, some of these occupancies are directly adjacent to, or across the street from, FGAN storage. Because the WFC operated in close proximity to schools, residences, and a nursing home, CSB plotted the 40 FGAN storage facilities in Google Earth™ to determine whether FGAN storage facilities are also in close proximity to residential areas, schools, or other large population clusters. CSB found that 19 (48 percent) of the facilities storing more than 10,000 pounds of FGAN are located within 0.5 miles of a school, hospital, nursing home, or a combination of those occupancies. Of the 40 FGAN facilities, 33 (83 percent) of the FGAN storage facilities are located within 0.25 miles of a residence or apartment building.116 The WFC facility was about 550 feet (0.16 miles) from the closest school, which sustained catastrophic damage as a result of the explosion, which could have resulted in additional loss of life had the school been in session at the time of the incident. CSB identified one other school in Texas that is 529 feet (0.12 miles) from an FGAN storage facility, even closer than the school destroyed in West, Texas (Figure 55). Of the 40 FGAN storage facilities, 16 (40 percent) are within 0.5 miles of an elementary school, secondary school, or high school (Figure 56).

115 CSB noted that two new FGAN facilities registered with the OTSC between September 2014 and October 2015 and that five facilities were listed in September 2014 that did not register to sell FGAN in October 2015. 116 The closest structures with obvious characteristics of a private residence were selected for this measurement using Google Earth and Google Street View.

West Fertilizer Company Final Report January 2016 89 U.S. CHEMICAL SAFETY AND HAZARD INVESTIGATION BOARD

529 Feet FGAN Facility School

Figure 55. Overhead View of a School Approximately 529 Feet from an FGAN Storage Facility (Source: Google Earth)

Figure 56. Breakdown of FGAN Storage Facilities (10,000 pounds or more) Within 1 Mile of a Texas School (Source: CSB) 0 2 4 6 8 10 12 14 16 18 Less than 0.25 miles (< 0.4 km) 0.25 to 0.50 miles (0.4 to 0.8 km) 0.50 to 1 mile (0.8 to 1.6 km) Greater than 1 mile (> 1.6 km) Number of Texas FGAN Facilities Distance to Schools Fire Code No Fire Code

West Fertilizer Company Final Report January 2016 90 U.S. CHEMICAL SAFETY AND HAZARD INVESTIGATION BOARD

The West Rest Haven nursing home was located about 600 feet from the WFC facility and sustained irreparable damage as a result of the blast. CSB measured distances between Texas FGAN storage facilities and nearby hospitals and nursing homes and found that 38 percent of the facilities are within 1 mile of a nursing home or hospital. In one case, a fertilizer facility is adjacent to a 50-bed hospital and a residence, also a few blocks from a school (Figure 57). Hospital 278 Ft. FGAN Facility Residence 220 Ft. School 1432 Ft.

Figure 57. Overhead View of a Texas FGAN Storage Facility near a Hospital, Residence, and School (Source: Google Earth) Findings from the analysis of the proximity of FGAN storage facilities to various community structures show that the risk to the public from a catastrophic incident exists throughout the state of Texas. Injury data published by the Waco-McLennan County Health Department supported the conclusion that people within 1,500 feet (or 0.28 miles) from the blast epicenter were the majority of those injured in the WFC fire and explosion, particularly those who were inside a structure at the time of the blast.117 5.5 Limits of Insurance Coverage in Texas Property and liability insurance companies can complement government oversight of industry by identifying hazards and reducing losses through the insurance process. In some ways, insurance can

117 Waco-McLennan County Public Health District. “Public Health Report: Injuries Related to the West (Texas) Fertilizer Plant Explosion,” April 2013 (issued on June 24, 2014).

West Fertilizer Company Final Report January 2016 91 U.S. CHEMICAL SAFETY AND HAZARD INVESTIGATION BOARD

augment government standards and safety monitoring.118 The insurance industry provides coverage for losses at established premiums but also has an incentive to reduce and manage risks. Insurers perform functions of risk reduction and risk management by using tools such as auditing and inspecting their clients, managing loss prevention efforts, analyzing loss histories, identifying causes of accidents, and teaching clients how to avoid premium increases (or how to secure premium reductions).119 Insurance reinforces existing government regulations by expecting that policyholders comply with existing requirements. This approach can be effective at reducing risk and preventing incidents because annual insurance audits can be more frequent than state or federal enforcement inspections, such as those by SFMO or OSHA. Texas law does not require facilities that store FGAN to obtain commercial general liability or property insurance; however, the WFC voluntarily obtained insurance. The WFC’s $1 million general liability policy with U.S. Fire did not include excess or umbrella coverage for the consequences of serious incidents, such as bodily injury and property damage. If the WFC is found responsible for this incident in civil cases, its insurance would not be sufficient to pay the full amount of insurance claims for the catastrophic consequences caused by the blast. Texas law requires some businesses to have liability insurance for operations that potentially pose a lower level of public risk than the WFC incident (Table 5). Air conditioning and refrigeration contractors, mold assessors, and plumbers are some of the businesses or services subject to commercial general liability requirements in Texas. For amusement ride owners and operators, Texas set the minimum requirements for insurance at $1.5 million per occurrence and requires proof of insurance to operate an amusement ride. For an amusement park ride to operate in the state, the ride must be inspected at least annually by the insurer.120 The ride also must meet the standards for coverage and have an adequate amount of insurance coverage.121 Operators of amusement park rides annually must file copies of the inspection certificate and insurance policy with the TDI Commissioner. The Texas amusement ride regulation also requires operators of coin-operated rides and bounce houses to obtain liability insurance. However, FGAN storage facilities such as the WFC facility can operate next to schools, residential areas, and hospitals with little or no general liability insurance. Adequate levels of coverage would likely prompt rigorous onsite loss control audits by insurers.

118 Ben-Shahar, Omri, and Kyle D. Logue. “Outsourcing Regulation: How Insurance Reduces Moral Hazard,” Michigan Law Review 111:2 (2012); University of Michigan Law and Economics Research Paper No. 12-004; University of Chicago Institute for Law and Economics Olin Research Paper No. 593. See: http://ssrn.com/abstract=2038105 (accessed on January 6, 2016). 119 Ibid. 120 Texas Occupations Code, § 2151.101, “Regulations of Amusement Rides: Requirements for Operation.” See: http://www.statutes.legis.state.tx.us/Docs/OC/htm/OC.2151.htm (accessed on August 4, 2015). 121 Ibid.

West Fertilizer Company Final Report January 2016 92 U.S. CHEMICAL SAFETY AND HAZARD INVESTIGATION BOARD

Table 5. Minimum Insurance Requirements in Texas122 Business/Operation Minimum Amount Amusement ride operators $1.5 million Elevator/escalator contractors $1.5 million123 Mold assessors and remediators $1 million124 Electricians $600,000125 Residential appliance installers $600,000126 Plumbers $300,000127 Tow truck operators $300,000128 Structural pest control providers $300,000129 Used automotive parts recyclers $250,000130 Air conditioning service providers $200,000131

Previous incidents in Athens, Bryan, and West have demonstrated the risk imposed by FGAN facilities on Texas communities and the public. In the absence of a state fire code, there is limited state oversight to ensure that facilities are addressing conditions that could potentially lead to an incident similar to the WFC fire and explosion.

122 See: http://www.dallasnews.com/news/west-explosion/headlines/20130508-texas-makes-bounce-house-operators- carry-liability-coverage-but-not-plants-like-west-fertilizer.ece (accessed on January 6, 2016). 123 See: https://www.tdlr.texas.gov/elevator/Elevapp.pdf (accessed on January 6, 2016). 124 Texas Administrative Code Licensing Requirements. See: http://txrules.elaws.us/rule/title25_chapter295_sec.295.309 (accessed on January 6, 2016). 125 See: http://www.tdlr.texas.gov/electricians/forms/ElectricianCOI.pdf (accessed on January 6, 2016). 126 See: http://www.tdlr.texas.gov/electricians/forms/ELC012 Residential Appliance Installation Contractor License Application.pdf (accessed on January 6, 2016). 127 See: http://www.tsbpe.state.tx.us/common/CertificateofInsuranceForm-fillablefeb2012.pdf (accessed on January 6, 2016). 128 Administrative Rules of the Texas Department of Licensing and Regulation, § 86.400, “Insurance Requirements— Tow Truck Permits.” 33 TexReg 2940. New section adopted, effective April 15, 2008. 129 Texas Occupations Code, § 1951.312, “Liability Insurance.” See: http://www.statutes.legis.state.tx.us/Docs/OC/htm/OC.1951.htm (accessed on January 6, 2016). 130 See: https://www.tdlr.texas.gov/parts/aprrules.htm#8740 (accessed on January 6, 2016). 131 Proof of insurance is required only with an initial application for licensure, a change in license assignment (new company), or a request by the Department of Insurance.

West Fertilizer Company Final Report January 2016 93 U.S. CHEMICAL SAFETY AND HAZARD INVESTIGATION BOARD

Triangle conducted annual inspections at the WFC facility and identified conditions that could result in potential losses, such as fires and worker injuries. Although Triangle did not focus specifically on hazards related to FGAN storage, it offered recommendations to the WFC to correct conditions, such as electrical hazards, that could result in a fire. CSB did not receive any documentation that U.S. Fire continued performing similar audits and inspections at the WFC facility after Triangle’s nonrenewal. It is not common for states to have prescriptive requirements for insuring specific industries. However, TDI does impose liability insurance and inspection requirements for amusement park rides and establishes minimum liability insurance coverage for certain operations and services, as listed in Table 5. CSB identified other FGAN storage facilities located in close proximity to community structures; however, the level of insurance carried by these facilities remains unknown. In response to the WFC incident, TDI conducted a voluntary survey of 95 Texas fertilizer facilities in June 2013 and requested the names of the companies that insure those facilities against general liability, property, and workers’ compensation losses. TDI received 12 responses to the 95 inquiries. Although the number of responses does not suggest that the remaining fertilizer facilities are uninsured, there is no way to determine whether these facilities have insurance policies that incorporate audits and inspections to focus on safe FGAN storage and handling conditions. On March 5, 2015, House Bill 2470 proposed amendments to the Texas Commercial Fertilizer Rules to require proof of liability insurance coverage for annual registration, similar to the requirements for amusement park rides. The bill proposed to amend the Texas Agriculture Code to require public liability insurance to produce, store, transfer, blend, or sell FGAN or FGAN-containing materials upon applying for a permit under the Texas Commercial Fertilizer Rules.132 However, this bill did not pass the state legislature. Without insurance and inspection requirements for FGAN facilities, operators can sell bulk quantities of fertilizer with little or no insurance coverage. The process of obtaining insurance could encourage both agricultural insurers and insured parties to assess current risks and to increase the awareness and rigor of insurance audits to ensure that companies are safely storing FGAN in accordance with guidance released as part of Executive Order 13650 (addressed in Section 8.1), OSHA standards, and industry consensus standards such as NFPA 400. Minimum coverage requirements will spur more realistic risk analysis by insurers that write coverage for FGAN bulk storage retail facilities. By providing agricultural businesses the guidance to identify and address FGAN hazards when underwriting and conducting annual loss control inspections, insurers can play a role in ensuring that FGAN facilities mitigate hazardous conditions.

132 The required liability insurance policy proposed by HB 2470 afforded bodily injury and property damage protection in an amount determined by TDI to compensate a person who incurred damages as a result of FGAN operations. The bill also directed TDI to coordinate with the Texas State Fire Marshal, Department of Health Services, Office of the Texas State Chemist, and other agencies to study the risk exposure for FGAN activities to determine the appropriate requirements for a liability insurance policy.

West Fertilizer Company Final Report January 2016 94 U.S. CHEMICAL SAFETY AND HAZARD INVESTIGATION BOARD

  1. 6 Insurance Services Office Rating

The Insurance Services Office (ISO)133 is an independent commercial enterprise and insurance industry advisory company that provides information, evaluation, and underwriting on safety and risk management related to community fire protection and building code effectiveness, serving insurance companies and other fire safety organizations. ISO adopts a public protection classification (PPC) system to develop fire insurance premiums for residential and commercial properties.134 ISO obtains information on municipal fire protection efforts in communities throughout the United States. Those data are then analyzed and evaluated for communities, using a standardized method and criteria known as the Fire Suppression Rating Schedule (FSRS). The FSRS assigns a PPC rating (from 1 to 10) to fire departments in each community. Class 1 represents exemplary public protection, and Class 10 indicates that the area’s fire suppression program does not meet ISO minimum criteria. ISO develops a split classification; for example, 5/9. The first class (Class 5 in the example) applies to properties within 5 road miles of a fire station and within 1,000 feet of a fire hydrant. The second class (Class 9 in the example) applies to properties within 5 road miles of a fire station but farther than 1,000 feet from a hydrant. ISO generally assigns Class 10 to properties farther than 5 road miles from a fire station. To determine a community’s PPC, ISO conducts a field survey, with ISO staff members visiting the community to observe and evaluate features of the fire protection systems. Using the FSRS, ISO objectively evaluates three major areas: fire department,135 water supply,136 and fire alarm and communication systems.137 When ISO allocates a high class rating to a fire department, ISO works with the affected fire department and the city to make improvements to the fire department, water system, and/or fire and alarm communication systems. Once these improvements are completed, the city then requests a new ISO reclassification. ISO reevaluates the city and then notifies the fire department of the new PPC rating. If a lower rating is received, the city notifies all homeowners and business owners to inform their insurance carriers to adjust their policies based on the new classification.

133 See: http://www.isomitigation.com/index.php/about-iso (accessed on January 7, 2016). 134 Insurance companies often rely on information from ISO about a community’s fire protection services to evaluate claims and damages. 135 A review of the fire department accounts for 50 percent of the total classification. ISO focuses on a fire department’s first-alarm response and initial attack to minimize potential loss. Here, ISO reviews items such as engine companies, ladder or service companies, distribution of fire stations and fire companies, equipment carried on apparatus, pumping capacity, reserve apparatus, department personnel, and training. 136 A review of the water supply system accounts for 40 percent of the total classification. ISO reviews the water supply that a community uses to determine the adequacy for fire suppression purposes. It also considers hydrant size, type, and installation as well as the inspection frequency and condition of fire hydrants. 137 An ISO review of the fire alarm system accounts for 10 percent of the total classification. The review focuses on the community’s facilities and support for handling and dispatching fire alarms.

West Fertilizer Company Final Report January 2016 95 U.S. CHEMICAL SAFETY AND HAZARD INVESTIGATION BOARD

  1. 6.1 Impact of the City of West Class 5 ISO Rating on the West Fertilizer

Company According to the West Fire Department, ISO rated the city of West at Class 5 before April 17, 2013. The pre-incident ISO classification and PPC rating of the West Volunteer Fire Department (WVFD) placed the city of West among the top 25 percent of all Texas communities (Figure 58). The average classification rating for communities and fire departments in Texas is Class 7.

Figure 58. Distribution of ISO Class Ratings for Cities and Communities in Texas (Source: ISO)138 On the national scale, the average PPC for cities, fire departments, and communities in the United States is Class 7 (the same as the average for Texas). The current ISO rating of the WVFD places the city of West among the top 30 percent of all communities nationwide (Figure 59).

138 See: http://www.isomitigation.com/index.php/ppc-program/how-the-ppc-program-works/facts-and-figures (accessed on December 20, 2015).

West Fertilizer Company Final Report January 2016 96 U.S. CHEMICAL SAFETY AND HAZARD INVESTIGATION BOARD

Figure 59. Distribution of ISO Class Ratings for All U.S. Cities and Communities (Source: ISO)139 Firefighters who responded to the WFC fire reported difficulty in extending their 4-inch fire hoses to the nearest fire hydrant, which was located at West High School, more than 1,500 feet from the burning fertilizer plant. A surviving firefighter testified that the emergency responders had to use one of their fire trucks as a connector line to reach the nearest fire hydrant at the high school. After dropping all of the hose lines on the engine, they discovered that they were about 700 feet short of the length needed to effectively fight the fire. Some of the volunteer firefighters then arranged to take the engine with hose and continue to string lines. One of the firefighters subsequently returned to the hydrant near the high school to attempt to establish a connection from the hose line to the fire hydrant. The explosion occurred just as the firefighter arrived at the fire hydrant, and he survived the explosion, although with severe injuries. The WFC plant was not incorporated into the West city limits,140 so an ISO assessment of the city of West did not capture the fertilizer plant as a high-risk facility. An ISO evaluation of the WFC plant would have increased the city’s ISO rating and would have compelled the insured residents141 and industrial facilities to carry higher homeowners and industrial hazard insurance premiums.142 The WFC

139 Ibid. 140 Section 9 discusses land use planning and zoning. 141 If the WFC plant had been included in the ISO rating, the city of West would have had a higher classification score, with an increased insurance premium for homeowners in West because of the proximity of the fertilizer plant to residential neighborhoods. 142 The rating directly impacts the premiums that insurance companies charge for commercial and industrial facilities as well as homeowner’s coverage. A lower ISO rating means a lower price for insurance coverage.

West Fertilizer Company Final Report January 2016 97 U.S. CHEMICAL SAFETY AND HAZARD INVESTIGATION BOARD

had insurance coverage of $1 million, without any prior evaluation from ISO. If ISO had evaluated the fertilizer plant, insurance underwriters would have charged a higher premium for the WFC plant based on the level of risks and hazards associated with the chemicals and operations at the WFC facility. Also, the ISO rating system would have revealed the distance from the nearest fire hydrant to the fertilizer plant, which would have increased the PPC rating. To obtain lower ISO PPC ratings, the city of West would have had to make adjustments by installing and regularly maintaining fire hydrants with ISO-minimum water flow rates closer to the fertilizer plant to enable ease of reach during emergencies.143 6.0 Inherently Safer Technology FGAN has certain risk characteristics that can make it inherently dangerous under some conditions. Ammonium nitrate (AN) by itself is a powerful oxidizer; when mixed with fuel oil, it can be used as an industrial explosive when exposed to fire or shock. Traditional safety practices to control FGAN fire and explosion hazards through procedures, hazard awareness, and emergency response are important. However, applying the concept of inherently safer technology (IST) or inherently safer design (ISD) can substantially reduce risk. IST and ISD are recognized approaches for decreasing risk by permanently reducing or eliminating the hazards associated with materials and operations used in an industrial process.144 Trevor Kletz, an acknowledged expert on IST and chemical process safety, defined IST as the avoidance of hazards rather than the control of hazards by adding protective equipment.145 Inherently safer processes can be achieved by strategies such as: • Substituting dangerous chemicals or processes with safer alternatives. • Simplifying processes. • Minimizing the quantity of a chemical on hand or in a process. • Moderating the operating conditions of a process. Before the widespread adoption of IST, plant designs in the chemical industry tended to address reduction of risk by relying on layers of protective equipment, procedures, and alarms.146 IST is preferable to adding layers of protection because, while this approach might reduce the likelihood or impact of an event, the inherent hazards remain.147 The concept of IST can be derived from a list of strategies for

143 To qualify for rating credit, fire hydrants must be capable of delivering a minimum of 500 gpm for 30 minutes. 144 Center for Chemical Process Safety. Inherently Safer Chemical Processes—A Life Cycle Approach, Second Edition. New York: John Wiley & Sons, 2009. 145 Kletz, Trevor A., and Paul Amyotte. Process Plants: A Handbook for Inherently Safer Design. Boca Raton, FL: CRC Press, 2009. 146 Kletz, Trevor, and Paul Amyotte. Process Plants: A Handbook for Inherently Safer Design, Second Edition. Boca Raton, FL: Taylor & Francis, 2010. 147 Ibid.

West Fertilizer Company Final Report January 2016 98 U.S. CHEMICAL SAFETY AND HAZARD INVESTIGATION BOARD

reducing risk (Figure 60). IST is most effective when implemented during the earliest stages of the process design, but it can be applied at all stages of a life cycle (design, operation, shutdown, and demolition).148

Figure 60. Risk Control Hierarchy (Source: CCPS)149 Table 6 lists some IST approaches that can be applied to FGAN. Table 6. Inherently Safer Approaches for Handling FGAN150 Inherently Safer Strategy Description Examples Substitution Replacing a hazardous material with a safer option Use a fertilizer with less explosive potential than FGAN Minimization Reducing the quantity of a hazardous material used in a chemical process Store FGAN in purpose-built buildings holding smaller quantities of materials, well separated from one another and from potential sources of contamination Moderation Using a hazardous material under the least hazardous conditions Store FGAN in bins constructed of materials impervious to the effects of AN and in areas where electric service is not required Limitation of effects (a form of moderation) Changing designs or reaction conditions rather than adding protective equipment Construct FGAN storage bins to minimize the consequence of a possible explosion Simplification Eliminating process complexity to provide fewer opportunities for error and equipment failure Limit the types of FGAN blends sold to minimize the need for staff to handle FGAN.

148 National Research Council. The Use and Storage of Methyl Isocyanate (MIC) at Bayer CropScience. Washington, DC: The National Academies Press, 2012. 149 Center for Chemical Process Safety. Inherently Safer Chemical Processes—A Life Cycle Approach, Second Edition. New York: John Wiley & Sons, 2009: 3, 27. 150 Ibid.

West Fertilizer Company Final Report January 2016 99 U.S. CHEMICAL SAFETY AND HAZARD INVESTIGATION BOARD

Once all hazards associated with a chemical process are identified and understood, IST can be applied in the design phase or to existing processes. According to Kletz, the concepts of IST are not sharply defined and can merge into each other, depending on how they are applied.151 Although not always feasible or cost-effective, substitution is often the most desired approach for reducing hazards because it involves replacing a hazardous material with a safer alternative. Minimization to reduce the quantity of a hazardous chemical stored or used within a process can often have a dramatic effect on risk, albeit usually only locally. The concept of moderation usually involves processing or storing chemicals under conditions that are less likely to add to or exacerbate risk—such as lower temperatures and pressures, removal of potential catalysts and sources of ignition, or use of materials of construction that minimize heat exposure near FGAN. In addition, the concept of simplification involves modifying procedures to reduce the likelihood of operator error and designing processes that require little or no operator actions to render the process safe in the event of a loss of control. The implementation of one or more of the inherently safer options, if feasible, can eliminate or minimize hazards instead of controlling them. IST might not eliminate all risks associated with a process, and some apparently inherently safer options might introduce new hazards that are of greater concern than those eliminated. For example, a reduced quantity of a hazardous chemical at a plant can lead to greater risk in transportation systems or at the originating plant. Elimination of large FGAN inventories at facilities similar to the West Fertilizer Company (WFC) is impractical because farmers rely on large quantities of fertilizer for their crops. Lower inventories could potentially introduce new hazards from the larger number of FGAN shipments needed to supply storage facilities. Accordingly, before implementation, IST options must be thoroughly analyzed and assessed, considering all risks and not only the interests of an individual facility. In terms of reducing the fire and explosion hazards associated with storage and handling of FGAN, two inherently safe measures are described in the rest of this section: (1) modify or substitute for the formulation of FGAN, making it less susceptible to fire or explosion, and (2) modify the conditions in which FGAN is stored to eliminate the possibility of a large fire and explosion. 6.1 Alternative Formulations of FGAN An alternative formulation of FGAN could reduce the potential for a detonation under fire conditions. However, more testing is necessary to ensure that these formulations are safer in bulk quantities, agriculturally compatible, and environmentally acceptable. In response to the 1947 FGAN explosion in Texas City, Texas, and to subsequent AN-based bombings across the United States,152 researchers have

151 Ibid. 152 Past AN-based bombings in the United States include the 1970 University of Wisconsin bombing, the 1990 Internal Revenue Service building bombing and other attempted bombings in California, the 1995 Murrah Federal Building bombing in Oklahoma City, and the 1996 attempted bombing of the FBI fingerprint database complex in Clarksburg, West Virginia.

West Fertilizer Company Final Report January 2016 100 U.S. CHEMICAL SAFETY AND HAZARD INVESTIGATION BOARD

explored several options for inerting or desensitizing FGAN to lower the detonation sensitivity of the material. One method introduced in 1968 claimed to render FGAN inert with the addition of 5 to 10 percent monoammonium phosphate and diammonium phosphate.153 However, in 1995, a test showed that the mixture was detonable with a larger charge diameter than the initially presented charge.154 In 1997, the International Fertilizer Development Center conducted a study for ATF to study the feasibility, practicability, and impact of making nitrate-based fertilizer chemicals inert. The study concluded that it is not feasible to inert AN without adversely affecting its effectiveness and efficiency as a fertilizer.155 In 1998, the National Research Council (NRC) released a report that addressed existing studies for inerting AN. The NRC examination concluded that FGAN with altered prill porosity, dilutants, or chemical additives could still be detonable156 and that no current technology would reduce the risk without seriously affecting the utility of AN as a fertilizer.157 The NRC recommends further examinations of the impacts of alternate formulations on agricultural suitability, costs to the end-user and environmental impacts of additives or inertants.158 Large quantities of inert materials mixed with AN might not be practical because of the cost and the reduction in fertilizer effectiveness. Adding a percentage of another chemical to AN can make it safer, but farmers might need to buy and transport more fertilizer to deliver the same quantity of nitrogen to their crops.159 CSB has reviewed documentation and publications that describe a few of those alternatives to AN based on the addition of inert chemicals (Table 7). Table 7. Examples of AN Fertilizer Alternatives Name Method Claims

153 Porter, S.J. “Method of desensitizing fertilizer grade FGAN and the product contained,” U.S. Patent 3,366,468, 1968. 154 National Research Council. Containing the Threat from Illegal Bombings: An Integrated National Strategy for Marking, Tagging, Rendering Inert, and Licensing Explosives and Their Precursors. Washington, DC: National Research Council, 1998: 106. See: http://www.nap.edu/openbook.php?record_id=5966&page=106 (accessed on June 26, 2014). 155 See: https://www.atf.gov/file/57516/download (accessed on January 20, 2016). 156 National Research Council. Containing the Threat from Illegal Bombings: An Integrated National Strategy for Marking, Tagging, Rendering Inert, and Licensing Explosives and Their Precursors. Washington, DC: National Research Council, 1998: 106. See: http://www.nap.edu/openbook.php?record_id=5966&page=106 (accessed on June 26, 2014). 157 Ibid. 158 Ibid. 159 Thompson, Steve. Dallas News. Quoting Bob Best, Pentagon scientist: “There are safer alternatives to FGAN fertilizer. But a safer form?” See: http://watchdogblog.dallasnews.com/2013/10/there-are-safer-alternatives-to- ammonium-nitrate-fertilizer-but-a-safer-form.html/ (accessed on June 26, 2014).

West Fertilizer Company Final Report January 2016 101 U.S. CHEMICAL SAFETY AND HAZARD INVESTIGATION BOARD

Sulf-N® 26160 (ASN 26) FGAN fused with ammonium sulfate161 The addition of ammonium sulfate dampens the role of FGAN combustion.162 Ferti-Safe163 Fly-ash-coated and gypsum- coated fertilizer Detonation potential can be reduced or eliminated. Calcium ammonium nitrate (CAN) Mixture of FGAN and limestone (calcium carbonate) or dolomite (calcium magnesium carbonate) Some tests revealed less oxidizing capability than FGAN. CAN is less prone to thermal decomposition than FGAN.

Honeywell has developed a fertilizer called Sulf-N 26 (later marketed by J.R. Simplot Company as ASN 26), claimed to be inherently safer than FGAN. Sulf-N 26 is made of nitrogen and sulfur164 by fusing FGAN with ammonium sulfate (AS), a fire retardant. For the patent, tests were conducted according to United Nations Recommendations on the Transport of Dangerous Goods.165 The test method is designed to measure the potential for a solid substance to increase the burning rate or burning intensity of a combustible substance when the two are thoroughly mixed. The mixture of FGAN fused with AS did not burn in the test, and the mixture was not classified as an oxidizer. Sulf-N 26 contains significantly less nitrogen than FGAN (26 percent compared to 34 percent).166 This nitrogen level can be an issue for some farmers as the effective absorption rate of nitrogen is vitally important to plants. Sulf-N 26 also contains higher quantities of sulfur, which farmers can need for certain types of crops and soils but not for others. Further examination is necessary to fully assess the use of Sulf-N 26 as an inherently safer alternative to FGAN. Notably, a 50/50 mixture of AS and FGAN was involved in the 1921 Oppau, Germany, explosion. Researchers from the University of Kentucky developed a technology called Ferti-Safe to desensitize FGAN by coating it with an ash-like coal combustion by-product.167 They developed the technology with the intention of preventing the malicious use of FGAN for explosive devices. The Ferti-Safe formulation

160 Sulf-N 26 was not commercially available at the time of the WFC incident. 161 Honeywell. “Honeywell Sulf-N 26.” See: http://sulfn26.com/ (accessed on June 26, 2014). 162 Ibid. 163 Ferti-Safe was not commercially available at the time of the WFC incident. 164 Honeywell. “Honeywell Sulf-N 26.” See: http://sulfn26.com/ (accessed on June 26, 2014). 165 United Nations. Recommendations on the Transport of Dangerous Goods, Manual of Tests and Criteria, ST/SG/AC.10/11/Rev2, Section 34, Classification Procedures, Test Methods and Criteria Relating To Oxidizing Substances of Division 5.1, Test O.1: Test for Oxidizing Solids, 1995. 166 Bomgardener, Melody M. “Safer Fertilizer,” Chemical and Engineering News, December 6 (2011). See: http://cen.acs.org/articles/89/web/2011/12/Safer-Fertilizer.html (accessed on May-June 2015). 167 Taulbee, D. et al. Reducing the Explosion Potential of Ammonium Nitrate Fertilizer, Final Report to the National Institute of Hometown Security, Lexington, KY (2012).

West Fertilizer Company Final Report January 2016 102 U.S. CHEMICAL SAFETY AND HAZARD INVESTIGATION BOARD

involves coating FGAN with gypsum (calcium sulfate) and fly ash.168 Both coating options are claimed to be effective in stopping an explosion of a blend of ammonium nitrate/fuel oil (ANFO).169 Calcium ammonium nitrate (CAN) contains 26 percent nitrogen and about 25 percent inert calcium carbonate. Formulations of CAN have been used in Europe and other countries since the 1920s, but it is not manufactured in the United States. European safety data sheets state that CAN is not capable of self- sustaining progressive thermal decomposition.170 The scope of most existing studies on alternative forms of FGAN is focused on reducing or eliminating the security threats associated with using FGAN to construct improvised explosive devices with the addition of fuel oil, but such studies do not focus on FGAN used in agricultural operations. Although some of the available information on these options suggests that they might be inherently safer, only limited testing has been performed to characterize the behavior of the alternatives in fire situations similar to that at the WFC. FGAN is vital to the nourishment of crops across the country, and alternative formulations must also be capable of meeting agricultural fertilizer needs. Because of the lack of scientific literature to show that alternative formulations of bulk FGAN can resist detonation in fires, CSB concludes that FGAN detonations can currently best be avoided through better compliance with storage practices and the application of inherently safe building design and storage. 6.2 Inherently Safe Building Design and Storage In the United States, FGAN storage practices at facilities similar to the WFC have not significantly changed over time. Before the fires in Bryan, Athens, and West, these Texas FGAN facilities had similar construction, with combustible materials and construction and limited fire safety features. CSB visited another EDC facility in Itasca, Texas, in 2013 and also noted combustible construction for the storage facility and bins. Findings from the WFC incident demonstrate that inherently safer concepts can be applied to storage practices to significantly reduce the risk of a fire or explosion. Modifying existing facilities or constructing new storage facilities with inherently safe options—such as facility set-back distances and the use of noncombustible construction materials—can reduce such risks. Because FGAN behavior is unpredictable in fire conditions, the most immediately effective strategy for reducing risk in existing and future FGAN storage facilities is to use inherently safer building design options to avoid creating the hazardous conditions that can contribute to a large uncontrollable FGAN fire and detonation. CSB concluded that the storage of combustible materials near FGAN storage piles and the use of combustible bins likely facilitated the spread of the FGAN-related fire to other bins and nearby

168 Fly ash is a fine particle residue of coal combustion. 169 Taulbee, D. et al. Reducing the Explosion Potential of Ammonium Nitrate Fertilizer, Final Report to the National Institute of Hometown Security, Lexington, KY (2012). 170 See: http://www.eurochem.ru/wp-content/uploads/2012/08/SDB_27_KASweiss_0124_EU.pdf (accessed on January 7, 2016).

West Fertilizer Company Final Report January 2016 103 U.S. CHEMICAL SAFETY AND HAZARD INVESTIGATION BOARD

combustibles. The combustibles also likely acted as a fuel during the fire; the soot, creosote, and other contaminants from the burning wood materials mixed with the surface of the FGAN, potentially increasing its energy and sensitivity to detonation. By eliminating wood and other combustibles as construction materials for FGAN bins and storage facilities and also for the storage of nearby combustible materials, the possibility of contaminating FGAN during a fire or smoldering event is greatly reduced. However, organic materials (such as packing materials or seeds) that are commonly present with the storage of bulk fertilizer will increase the likelihood of an explosion and will make the FGAN explosion more energetic. Certain inorganic contaminants, including chlorides and some metals (such as aluminum powder, chromium, copper alloys, cobalt, and nickel), can also sensitize FGAN, increasing the likelihood of detonation.171 Current OSHA requirements in the Explosives and Blasting Agents standard in 29 CFR 1910.109(i) do not prohibit the use of wooden FGAN storage bins; instead, OSHA requires bins that are protected against FGAN impregnation (as noted in Section 8.2). The installation and use of concrete or metal172 storage bins would reduce the potential for a fire to spread throughout the facility and to other piles of FGAN or nearby combustible materials. It is also inherently safer to store FGAN in places where sources of ignition are not present. For example, a storage building without electric service eliminates the one of the possible sources of ignition and is thus inherently safer. In July 2009, an FGAN-related fire at the EDC fertilizer storage facility in Bryan, Texas, burned the facility to the ground, but the FGAN did not explode. The fire forced an evacuation of more than 80,000 residents in the Bryan area and students at the Texas A&M College Station campus. EDC rebuilt the facility, originally a wooden structure, with concrete bins surrounded by a concrete dome (Figure 61). EDC’s insurance company required the use of concrete construction materials instead of wood to minimize the fire risk.

171 EPA. “EPA Chemical Advisory: Safe Storage, Handling, and Management of Solid Ammonium Nitrate Prills.” See: http://www2.epa.gov/sites/production/files/2015-06/documents/an_advisory_6-5-15.pdf (accessed on November 30, 2015). 172 Galvanized iron, copper or copper alloys, lead, and zinc are not recommended metals for AN storage.

West Fertilizer Company Final Report January 2016 104 U.S. CHEMICAL SAFETY AND HAZARD INVESTIGATION BOARD

Figure 61. Reconstructed EDC Facility in Bryan, Texas (Source: CSB)

Use of concrete bins or external metal hoppers instead of wooden structures is considered an inherently safer option for FGAN storage. According to Kletz, the IST concept of moderation entails storing or transporting a hazardous material in a less hazardous manner.173 In this case, eliminating the presence of the combustibles removes an obvious and principal source of fuel and heat that contribute to detonation. Replacing bins with structures made of concrete instead of combustible materials also limits the quantity of FGAN available to support combustion by confining it to the bin and preventing the acceleration of a fire. It is well recognized that wood is not a preferred material of construction for buildings or bins storing FGAN, and untreated wooden bins should never be used to store FGAN because of the oxidizing properties of FGAN that will increase the burning temperature and rate of burn of the structure itself, facilitating the spread of a fire. Concrete or compatible metals should be used to avoid contamination during fires. The Health and Safety Executive in the United Kingdom states that FGAN storage “should be constructed of a material that does not burn, preferably concrete.”174 In March 2014, CSB responded to OSHA’s request for information (RFI) (at 78 Federal Register 73756) on future possible revisions to OSHA safety standards, including the Explosives and Blasting Agents standard in 29 CFR 1910.109(i) and the Process Safety Management standard in 29 CFR 1910.119. In response to the RFI, CSB urged OSHA to consider revising existing standards to provide more explicit requirements for the storage and handling of FGAN, including prohibiting wooden or combustible FGAN storage bins. 175 In May 2015, the NFPA issued a new edition of NFPA 400-2016, Hazardous Materials Code (Chapter 11, “Ammonium Nitrate”), which prohibits combustible construction materials for new FGAN storage facilities and establishes requirements for automated fire detection, fire suppression, alarm activation, and evacuation plans for existing facilities with combustible construction. CSB recommends that OSHA revise its standards to include requirements similar to those in NFPA 400-2016 for FGAN storage facilities to reduce the likelihood of a detonation when FGAN is exposed to fire. 7.0 Emergency Response The FGAN explosion at the West Fertilizer Company (WFC) facility killed 15 people and caused more than 260 injuries. Of the 15 fatalities, 12 were first responders (firefighters and emergency services) personnel who responded to the fire—eight volunteer firefighters, with five from the West Volunteer Fire Department (WVFD), two from the City of Abbott Fire Department, and one from the Mertens and

173 Kletz, Trevor, and Paul Amyotte. “Attenuation.” Process Plants: A Handbook for Inherently Safer Design, Second Edition. Boca Raton, FL: CRC Press, 2010: 103. 174 Health and Safety Executive (HSE). Storing and Handling Ammonium Nitrate. United Kingdom: Health and Safety Executive, 2004. See: http://www.hse.gov.uk/pubns/indg230.pdf (accessed on January 6, 2016). 175 CSB. “CSB Comments on the OSHA Proposed Rule: Process Safety Management and Prevention of Major Chemical Accidents.” See: http://www.regulations.gov/#!documentDetail;D=OSHA-2013-0020-0074 (accessed on November 30, 2015).

West Fertilizer Company Final Report January 2016 105 U.S. CHEMICAL SAFETY AND HAZARD INVESTIGATION BOARD

Navarro Mills Fire Department; an off-duty career firefighter (captain) from the City of Dallas Fire Department; an emergency medical technician (EMT) from West; and two good Samaritans who supported the emergency response at the fertilizer plant.176 One of the deceased volunteer firefighters who responded to the fire was also an employee of the WFC. CSB developed this section of our report to provide information to fire departments across the country by evaluating the key factors that contributed to the firefighter fatalities and to share lessons learned so that similar events can be avoided in the future. Accordingly, to determine what went wrong, CSB used emergency response documents, interviews, and video footage to analyze in detail the actions that were taken before and during the approximately 20 minutes that elapsed from the first call for assistance until the explosion occurred. This analysis is not focused only on volunteer firefighters; it demonstrates the need for effective pre- incident planning and firefighter training. Firefighters are expected to make risk assessments and decisions under time pressure with limited visibility during an actual response to a fire, which is almost impossible without adequate training. Although this analysis indicates that the emergency responders involved in this incident accepted an extremely high level of risk that resulted in multiple deaths, CSB recognizes that they were attempting to develop a plan of action for a fire scenario that none of them had prior practical experience with. 7.1 Firefighter Response The chain of events—from the time the volunteer firefighters and other emergency responders arrived at WFC until the time of the explosion—can never be precisely known. On the basis of interviews with surviving firefighters and the evaluation of the incident scene, CSB was able to assess the emergency response process on April 17, 2013. On the evening of the incident, the emergency responders who were initially dispatched to the fire arrived at the scene at different times. CSB obtained a street surveillance camera video recording and also camera footage from the inside of a neighboring hardware store in West.177 The surveillance recording indicated that four emergency response vehicles were en route between 7:37 pm and 7:51 pm, when the explosion occurred, as shown in the timeline of events in Figure 62.

176 One of these Good Samaritans was familiar with the equipment used by the WVFD and volunteered to assist the second, who was in the area tending to cattle and offered his help to the firefighters. These two deceased Good Samaritans were made honorary volunteer firefighters at the memorial for the fallen West, Texas, firefighters and other emergency responders held in Waco, Texas, on April 25, 2013. 177 The convenience store and street surveillance camera are located about a mile from the WFC facility at the intersection between East Pine Street and North Roberts Street.

West Fertilizer Company Final Report January 2016 106 U.S. CHEMICAL SAFETY AND HAZARD INVESTIGATION BOARD

Figure 62. Timeline of Events for Emergency Response to WFC Facility (Source: CSB)

Emergency responders were notified and dispatched to the scene at about 7:29 pm on April 17. The firefighters arrived on scene over a span of about 14 minutes, as recorded on surveillance footage of emergency vehicles en route to the WFC site that night.178 In the video footage, the WVFD fire chief can be observed driving the water tender toward the incident scene at about 7:41 pm. Firefighters were dispatched to the scene of the emergency without anyone’s knowledge of how long the fire had been

178 Because the WVFD is a volunteer-based service, it should be noted that the volunteer firefighters were not at the station at the time of the incident. Several firefighters were at home, attending to other personal activities or participating in an EMT training class.

West Fertilizer Company Final Report January 2016 107 U.S. CHEMICAL SAFETY AND HAZARD INVESTIGATION BOARD

burning or smoldering before being noticed.179 Upon arrival, they concentrated their efforts initially on the incident scene, preparing to suppress flames that were visible at the northeast portion of the storage structure. Without a robust incident pre-planning process in place, without adequate hazardous materials awareness training, and with no previous FGAN-related fire emergency training or drills, the firefighters had no expectation of a possible FGAN explosion. The firefighters were advised by the career fire captain that they did not have the resources to combat the growing fire and should concentrate on cooling the liquid anhydrous ammonia tanks located near the burning building to prevent the tank from rupturing or venting. However, they had not established that stream of water when the explosion occurred because they had to shut off the attack lines while the pumpers were repositioned.180 7.2 Key Contributing Factors to Emergency Responders’ Fatality CSB identified the following seven key factors that contributed to the fatalities of firefighters and other emergency responders in West:

  1. Lack of incident command system.
  2. Lack of established incident management system.
  3. Lack of hazardous materials (HAZMAT) and dangerous goods training.
  4. Lack of knowledge and understanding of the detonation hazards of FGAN.
  5. Lack of situational awareness and risk assessment knowledge on the scene of an FGAN-related

fire.

  1. Lack of pre-incident planning at the WFC facility.
  2. Limited and conflicting technical guidance on AN.
  3. 2.1 Lack of Incident Command System

CSB found that none of the responding emergency response personnel trained and certified in the National Incident Management System (NIMS) process formally assumed the position of Incident Commander (IC) who would have been responsible for conducting and coordinating an incident command system (ICS). Senior emergency response personnel at the WVFD arrived at the scene of the WFC incident at different times and did not delegate an IC to be in charge of the incident. Also, there was no record that arriving firefighters conducted an initial incident size-up or risk assessment to determine initial actions (offensive or defensive) that would be most suitable in responding to the incident based on the situation and available resources without putting emergency personnel at risk. Despite multiple responders having ICS training, none of them reportedly established command or took control of the fire ground. On the basis of a review of radio communications and interviews with surviving firefighters, CSB found no clear messaging or discussion among the responding firefighters on who should assume the role of the designated IC. Without a delegated IC officially taking control of the

179 CSB was unable to determine how long the fire had been burning before the firefighters were notified. 180 NIOSH Fire Fighter Fatality Investigation and Prevention Program. See: http://www.cdc.gov/niosh/fire/ (accessed on December 28, 2015).

West Fertilizer Company Final Report January 2016 108 U.S. CHEMICAL SAFETY AND HAZARD INVESTIGATION BOARD

fire ground operations, no ICS was established. Consequently, no senior emergency response personnel or IC was responsible for coordinating the various response activities carried out by individual firefighters on the scene. The West fire chief arrived on scene at about 7:41 pm and did not critically assess the conditions on the ground before the explosion 10 minutes later, at about 7:51 pm. The fire chief and assistant chief provided support and advisory functions but did not actively engage in fire ground function or take control of the fire ground; no record indicated that the West fire chief took command of the incident upon his arrival.181 Without direction to the contrary, the firefighters immediately took offensive action against the flames coming from the doors on north end of the east side of the structure. CSB interviews with surviving firefighters indicated that before the arrival of the fire chief, the other senior firefighters who had reached the incident scene about six minutes earlier had not delegated senior personnel with the training and expertise needed to formally assume responsibility as the IC. The firefighters had not reached a conclusion about how to establish a best approach and how to respond to the fire when the explosion occurred. Despite being trained for the ICS and NIMS process, none of the certified firefighters had prior practical experience in establishing incident command or coordinating and maintaining control of any previous emergency that merited the same approach as an FGAN-related fire scene. 7.2.2 Lack of Established Incident Management System CSB found that the emergency response personnel who responded to the WFC incident did not take time to set up, implement, and coordinate an effective incident management system plan that would have ensured evacuation of the nearby residents. Because no formal IC was in charge of the incident, none of the firefighters took responsibility for formally establishing and coordinating an effective incident management system. Witness testimonies revealed that emergency alert systems for the public were not activated before the explosion, although McLennan County had such systems in place.182 Many of the injuries might have been avoided or might have been less severe if an immediate evacuation had occurred. When the fire was first detected by a police officer, he ordered people in the parks near the facility to evacuate, and he blocked off roads. In addition, employees from the nursing home took the initiative as part of their company emergency response policy to move occupants to the back of the building for fear of smoke or an ammonia release. However, without a formal evacuation order to the entire affected community, many of the residents were left unaware of the risk and chose to watch the fire from inside their homes or vehicles or from the street, placing them within range of the high-pressure blast wave and in the line of flight of debris. In a study conducted after the WFC incident of FGAN-related fires worldwide since

181 NIMS requires that the ICS should be established by the first arriving NIMS qualified personnel. Best practices indicate that the fire chief does not need to be on the scene of a fire before the ICS can be established. 182 See Section 8.5 of this report.

West Fertilizer Company Final Report January 2016 109 U.S. CHEMICAL SAFETY AND HAZARD INVESTIGATION BOARD

1970, the majority of detonations occurred within 60 minutes of the initial fire report.183 Because this elapsed time to detonation might be shorter than the response times for emergency operations and potential firefighting, a ‘let-it-burn’ approach with a precautionary evacuation of the surrounding neighborhood is appropriate.184 An incident management system is intended to provide a standard approach to management of emergency incidents. The U.S. Department of Homeland Security (DHS) established NIMS in 2004.185 NFPA 1561 (2014 Edition) indicates, “[T]he incident management system shall provide structure and coordination to the management of emergency incident operations to provide for the safety and health of emergency services organization responders and other persons involved in those activities.”186 DHS developed the NIMS program to standardize the incident management process by facilitating coordination of an emergency among all responders (including all levels of government and public, private, and nongovernmental organizations) so that they work together seamlessly and manage incidents involving threats and hazards (regardless of cause, size, location, or complexity) to reduce loss of life, property damage, and harm to the environment. To achieve this objective, FEMA, an organization within DHS, developed a NIMS training program.187 All federal emergency responders, including firefighters, are required to receive NIMS training.188 Presidential Policy Directive 5, which established the NIMS training program, applies to all federal agencies, and non-federal entities, although not required to participate, are encouraged to do so.189 NFPA 1500 (Standard on Fire Department Occupational Safety and Health Program, 2013 Edition190) and NFPA 1561 (Standard on Emergency Services Incident Management System and Command Safety, 2014 Edition191) emphasize the need to use effective incident management systems at all emergency

183 Marlair, G., et al. Comments about the paper entitled “Lessons to be Learned from an analysis of ammonium nitrate disasters in the last 100 years,” by Pittman et al., Journal of Hazardous Materials 280 (2014). 184 Ibid. 185 See: https://www.fema.gov/national-incident-management-system (accessed on December 28, 2015). 186 NFPA. NFPA 1561: Standard on Emergency Services Incident Management System and Command Safety, 2014 Edition. Quincy, MA: NFPA, 2014. 187 The NIMS training program specifies National Integration Center and stakeholder responsibilities and activities for developing, maintaining, and sustaining NIMS training. The NIMS training program outlines responsibilities and activities that are consistent with the National Training Program, as mandated by the Post-Katrina Emergency Management Reform Act of 2006. This program integrates with FEMA training offered through the Emergency Management Institute (EMI) and USFA. See: http://www.fema.gov/pdf/emergency/nims/nims_training_program.pdf (accessed on December 28, 2015). 188 See: https://www.fema.gov/national-incident-management-system/training (accessed on December 28, 2015). 189 To compel non-Federal entities seeking grants, FEMA does require its grant recipients to verify that they are “NIMS-compliant.” However, there is no requirement for fire services not receiving federal grants to participate in NIMS. See: https://www.fema.gov/pdf/emergency/nims/nims_training_program.pdf (accessed on December 28, 2015). 190 NFPA. NFPA 1500: Fire Department Occupational Safety and Health Program, 2013 Edition. Quincy, MA: NFPA, 2013. 191 NFPA. NFPA 1561: Standard on Emergency Services Incident Management System and Command Safety, 2014 Edition. Quincy, MA: NFPA, 2014.

West Fertilizer Company Final Report January 2016 110 U.S. CHEMICAL SAFETY AND HAZARD INVESTIGATION BOARD

scenes. In most cases, this process is known as the ICS, with the primary objective of managing the incident. NFPA 1561 defines an incident management system as “a system that defines the roles and responsibilities to be assumed by responders and the standard operating procedures to be used in the management and direction of emergency incidents and other functions.” CSB concluded that despite multiple personnel in the WVFD being trained and certified to initiate and manage the NIMS process, none of the certified firefighters who responded to incident was designated to assume or assumed the role of IC to initiate and coordinate the ICS and incident management plan as stipulated in the NIMS process. If the West firefighters had executed a planned, tested, and practiced ICS and incident management plan, the number of injuries and casualties sustained by both responders and neighboring residents could have been reduced. 7.2.3 Firefighter Training Firefighters must cope with extraordinary situations and circumstances that threaten their personal safety. To improve execution and reduce the threat of injury or loss of life, it is vital for both volunteer and career firefighters to receive thorough training and information supporting effective decision making. CSB’s investigation of the WFC incident revealed that no standardized training requirement applies to volunteer firefighters across the nation.192 The NFPA has found that, in general, career firefighters have more funding from their local municipalities and thus are often better trained and better equipped compared to volunteer or hybrid fire departments across the country.193 In some communities, volunteer firefighters receive training in formal or informal settings; however, this training hinges on the state and regulatory authority, and the level and type of this basic and specialty training are not standardized. Some VFDs provide training programs equal to those of paid departments, but most volunteer firefighters either pay out of pocket or raise funds to pay for any additional specialty training. Such specialty training can address wildland firefighting, technical rescue, swift water rescue, HAZMAT response, vehicle extrication, and firefighter assist and search teams. CSB found that since there is no federal agency regulating municipal fire departments, some volunteer firefighters in less populated areas or rural communities rarely receive any major type of course training, and most of their initial training is usually on-the-job experience.194 In addition, some volunteer

192 Career firefighters have a standardized basic minimum training requirement. 193 In its report A Third Needs Assessment of the U.S. Fire Service, the NFPA found that compared to their big city counterparts, fire departments in smaller communities were more likely to report that many firefighters had not had formal training in various activities and did not have sufficient PPE. See: http://www.nfpa.org/~/media/files/research/nfpa-reports/fire-service-statistics/2011needsassessment.pdf?la=en (accessed on December 28, 2015). 194 Many volunteer firefighters near special or large manufacturing and storage facilities do receive training from the facility staff. This observation is particularly true when the volunteers include employees of the facility.

West Fertilizer Company Final Report January 2016 111 U.S. CHEMICAL SAFETY AND HAZARD INVESTIGATION BOARD

firefighters receive EMT195 and fire academy training.196 After completing the EMT and fire academy training, most firefighters are required to earn state certification. To maintain additional professional competency, some volunteer firefighters become state certified, but they must meet the same levels of requirements as those that apply to career firefighters. For example, in Texas, the general requirements for volunteer fire protection personnel certification programs are the same as those for paid personnel. Certification for paid fire protection personnel in Texas is mandatory, but for volunteer fire protection personnel, participation in a certification program is voluntary and not enforced.197 Texas does not require volunteer firefighters to receive a minimum level of training on how to respond to fires involving hazardous materials. In some cases, volunteer firefighters receive first-level certification, which gives an overview of fire suppression and rescue techniques, including HAZMAT and jaws-of-life training. NFPA 1001 (Standard for Fire Fighter Professional Qualifications, 2013 Edition198) provides recommended basic and minimum training requirements that all firefighters are expected to complete to respond to fire emergency calls. Once the basic training requirement has been met, the subsequent level of training differs between paid career and volunteer firefighters. In Texas, paid career firefighters are required to complete about 500 hours of training certification over four levels—introduction, basic, immediate, and advanced—through an academy-type program. Training and certification for volunteer firefighters are provided through the State Firefighters’ and Fire Marshals’ Association of Texas (SFFMA).199 The SFFMA sets up standards for training and certification, but local jurisdictions are left to decide how many firefighters should be sent for particular training and the level of certification needed to protect their respective localities. For example, VFDs in rural areas and sparsely populated communities might require their firefighters to be certified only at the introductory level because few

195 Some firefighters are mandated to receive certification as an EMT. The general EMT-Basic training requires about 100 hours of classroom or field instruction, usually involving some hours of practice in a hospital or ambulance. At the end of the training, EMT-Basic students must take and pass an examination. Firefighters seeking additional training may enroll in the EMT-Intermediate class or the Advanced EMT class, which includes an additional 1,000 hours of education in advanced medical emergency response and care. See: http://work.chron.com/certifications- need-become-firefighter-17338.html (accessed on December 28, 2015). 196 The fire academy training program prepares firefighters for state firefighter certification. The fire academy program involves the completion of classes in the fire science program. Other courses administered in the fire academy program for entry-level firefighters address building codes, emergency medical procedures, and prevention techniques. In addition, the programs train students to fight fires with standard equipment, such as fire extinguishers, ladders, axes, and chainsaws. See: http://work.chron.com/certifications-need-become-firefighter- 17338.html (accessed on December 28, 2015). 197 See: http://www.tcfp.texas.gov/certification/certification_overview.asp (accessed on December 28, 2015). 198 NFPA. NFPA 1001: Standard for Fire Fighter Professional Qualifications, 2013 Edition. Quincy, MA: NFPA, 2013. 199 According to its website, the SFFMA was established in 1876 to support fire and emergency service providers in Texas and beyond. The SFFMA offers support to more than 1,200 fire departments, 22,000 individual members, 80 industrial fire brigades, and EMS and international departments. See: http://www.sffma.org/web/SFFMA/About_Us/SFFMA/About.aspx?hkey=84e079d0-75c2-47df-b9e9- 7ae03d5685dd (accessed on December 28, 2015).

West Fertilizer Company Final Report January 2016 112 U.S. CHEMICAL SAFETY AND HAZARD INVESTIGATION BOARD

buildings are in the area. In contrast, other towns or communities (such as West) that are near a chemical plant might require their firefighters to receive HAZMAT training and certification. 7.2.4 Firefighter FGAN Knowledge and Lack of HAZMAT Training CSB determined that lack of knowledge and understanding of FGAN detonation hazards at the WFC facility contributed to the emergency responder fatalities. Interviews with surviving firefighters indicated that they did not have sufficient time and information to properly assess the WFC facility and evaluate the behavior of the FGAN-related fire. Because the firefighters did not have adequate knowledge of the FGAN hazard, they focused their emergency response efforts on the anhydrous ammonia tanks. The lack of adequate HAZMAT training and the lack of FGAN firefighting guidance contributed to the deaths of the emergency responders. A joint NFPA-USFA survey revealed that an estimated 36 percent of U.S. fire departments involved in HAZMAT responses have not provided formal training in those duties to all involved personnel.200 CSB reviewed the training and experience of the firefighters who were fatality injured in the WFC incident and found that all of the responding firefighters had minimum training and certifications for responding to fire emergencies, especially training through FEMA courses.201 In addition, very few of the volunteer firefighters involved in this explosion, including surviving officers, had received HAZMAT training. Only two of the deceased volunteer firefighters had taken the HAZMAT awareness course, which is the introductory basic level for HAZMAT training and includes recognition and use of the Emergency Response Guidebook (ERG) as well as notification protocols.202 Table 8 shows the age, rank, function at the scene, and training and experience levels of the victims. Table 8. Training and Experience Information of the Fatally Injured Firefighters203 Victim Rank Age Years of Experience Training Function on Scene 1 Firefighter 48 15 years with WVFD Landing zone safety, propane emergency response, fire and emergency management services emergency response, HAZMAT awareness, ladder practices, hose handling, live burns, basic self-contained breathing apparatus (SCBA), Introduction to Incident Dispatched to incident site by WVFD

200 NFPA, USFA. “Four Years Later: A Second Needs Assessment of the U.S. Fire Service.” See: www.usfa.fema.gov/downloads/pdf/publications/fa-303-508.pdf (accessed on December 28, 2015). 201 See: https://training.fema.gov/is/crslist.aspx?all=true (accessed on December 28, 2015). 202 NIOSH. “9 Volunteer Fire Fighters and 1 Off-Duty Career Fire Captain Killed by an Ammonium Nitrate Explosion at a Fertilizer Plant Fire–Texas.” NIOSH Report on Death in the Line of Duty. Report Number F2013-

  1. See: http://www.cdc.gov/niosh/fire/pdfs/face201311.pdf (accessed on December 28, 2015).

203 Ibid.

West Fertilizer Company Final Report January 2016 113 U.S. CHEMICAL SAFETY AND HAZARD INVESTIGATION BOARD

Victim Rank Age Years of Experience Training Function on Scene Command System (ICS-100),204 ICS for Single Resources and Initial Action Incidents (ICS-200),205 National Incident Management System (NIMS): An Introduction (IS-700),206 National Response Framework: An Introduction (IS-800b)207 2 Career Fire Captain (off duty) 52 31 years with career fire department 31 years as a career firefighter from Dallas (Training status unknown) Responded voluntarily to assist WVFD 3 Firefighter 26 2 years at mutual aid VFD ICS-100, ICS-200, IS-700a, NIMS Multiagency Coordination System (MACS) Course (IS-701a),208 NIMS Public Information Systems (IS-702a),209 NIMS Resource Management (IS- 703a)210 Dispatched for mutual aid 4 Firefighter 37 17 years at mutual aid VFDs211 Emergency vehicle operations, basic auto extrication, compressed air foam systems,212 basic firefighting, ICS-100, ICS-200, IS-700a, IS-800.b, HAZMAT I & II,213 Various training classes offered by TEEX and other departments since 1996.214 Responded in privately owned vehicle (POV); dispatched for mutual aid 5 Volunteer Captain 29 10 years at mutual aid VFD Training status unknown Attending EMT class nearby. Dispatched for mutual aid; responded in POV

204 See: https://training.fema.gov/is/courseoverview.aspx?code=IS-100.b (accessed on December 28, 2015). 205 See: https://training.fema.gov/is/courseoverview.aspx?code=IS-200.b (accessed on December 28, 2015). 206 See: https://training.fema.gov/is/courseoverview.aspx?code=IS-700.a (accessed on December 28, 2015). 207 See: https://training.fema.gov/is/courseoverview.aspx?code=IS-800.b (accessed on December 28, 2015). 208 See: https://training.fema.gov/is/courseoverview.aspx?code=IS-701.a (accessed on December 28, 2015). 209 See: https://training.fema.gov/is/courseoverview.aspx?code=IS-702.a (accessed on December 28, 2015). 210 See: https://training.fema.gov/is/courseoverview.aspx?code=IS-703.a (accessed on December 28, 2015). 211 Training information provided to the CSB by victim’s family. 212 Ibid. 213 Ibid. 214 Ibid.

West Fertilizer Company Final Report January 2016 114 U.S. CHEMICAL SAFETY AND HAZARD INVESTIGATION BOARD

Victim Rank Age Years of Experience Training Function on Scene 6 EMT, Firefighter 33 1 year at mutual aid VFD Training status unknown Attending EMT class nearby. Rode in city ambulance 7 On E-1 Firefighter 41 2 years with WVFD Basic auto extrication, emergency driving, landing zone safety, ICS-100, IS-700a Responded on Engine 1 8 Firefighter 50 13 years with city VFD Fire and EMS emergency vehicle response, landing zone safety, ground cover (basic and intermediate), EMS emergency vehicle response, vehicle extrication, propane ER, fire and EMS ER, Intro to IC, HAZMAT awareness, fire emergency vehicle response, ladder practices, hose handling, live burns, basic SCBA, ICS-100, ICS-700a, IS-800b Drove the brush truck 9 Volunteer Captain 50 18 years with WVFD Basic firefighting, propane emergency response, ICS-100, IS-700a Responded in POV 10

Firefighter 29 3 years with WVFD Firefighting phase 1, emergency driving, basic auto extrication, landing zone safety, SCBA and smokehouse training, ICS-100, ICS-200b, Intermediate ICS for Expanding Incidents (ICS-300),215 Advanced ICS (ICS-400),216 IS-700a, IS- 701a, IS-702a, IS-703a, NIMS Communication and Information Management (IS-704), NIMS Intrastate Mutual Aid: An Introduction (IS-706),217 IS-800b Drove in Engine 1 Texas provides voluntary certification for HAZMAT technicians and HAZMAT ICs through the Texas Commission on Fire Protection (TCFP).218 The TCFP was established under Texas Government Code, Chapter 419, to develop and enforce recognized professional standards for individuals and the fire service.219 In addition, the TCFP provides education and assistance to the fire service and enforces

215 Intermediate ICS for Expanding Incidents (ICS-300) provides training and resources for personnel who require advanced knowledge and application of the ICS. This course expands on information covered in the ICS-100 and ICS-200 courses. See: http://training.fema.gov/emiweb/is/icsresource/trainingmaterials.htm (accessed on December 28, 2015). 216 The Advanced ICS (ICS-400) course provides training and resources for personnel who require advanced application of ICS. This course expands on information covered in ICS-100 through ICS-300. See: http://training.fema.gov/emiweb/is/icsresource/trainingmaterials.htm (accessed on December 28, 2015). 217 See: https://training.fema.gov/is/courseoverview.aspx?code=IS-706 (accessed on December 28, 2015). 218 See: http://www.tcfp.texas.gov/certification/certification_requirements.asp (accessed on December 28, 2015). 219 See: http://www.statutes.legis.state.tx.us/Docs/GV/htm/GV.419.htm (accessed on December 28, 2015).

West Fertilizer Company Final Report January 2016 115 U.S. CHEMICAL SAFETY AND HAZARD INVESTIGATION BOARD

statewide fire service standards. The TCFP is responsible for certification, training approval, and testing and compliance.220 CSB evaluated the curriculum manual used for HAZMAT certification for firefighters in Texas and found that FGAN explosion hazards were not covered at all. In fact, the manual mentioned FGAN twice under United Nations (UN)/DOT hazard classes and divisions of hazardous materials and weapons of mass destruction (WMD)—as a Class 1, Division 1.5 insensitive explosive221 and as a Class 5, Division 5.1 oxidizing substance222—in the 349-page document.223 Nationally, CSB found that the curriculum used for HAZMAT training does not fully address the hazards and severity of FGAN-related fires and explosions. A review of the U.S. Fire Administration (USFA) National Fire Academy HAZMAT field course outlines confirmed that they place little emphasis on emergency response to storage sites containing dangerous reactive chemicals and oxidizers such as FGAN. Conversely, HAZMAT shipping and transportation are covered in detail in the courses. A review of one firefighter training reference manual, Fundamentals of Firefighter Skills, compiled by the International Association of Fire Chiefs (IAFC) and the NFPA, indicated that very little guidance is provided to firefighters regarding responses to HAZMAT incidents involving reactive chemicals. Chapter 29 (“Hazardous Materials: Recognizing and Identifying the Hazards”) of the second edition of the Fundamentals of Firefighter Skills reference manual includes in-depth information on various HAZMAT transportation methods and containers but does not consider storage and warehousing for these materials. FGAN is not mentioned in the entire chapter.224 CSB concludes that the current training resources at the local, state, and federal levels do not provide sufficient information for firefighters to understand the hazards of FGAN. It is therefore essential for firefighter and emergency response training institutions to collaborate with fire departments to develop and implement a realistic process for ensuring that hazard response knowledge, once attained, does not become unused and obsolete.225

220 TCFP. See: http://www.tcfp.texas.gov/about/mission_and_goals.asp (accessed on December 28, 2015). 221 AN is mentioned as FGAN fertilizer and fuel oil mixtures (ANFO), an example of a very insensitive explosive with a mass explosion hazard (blasting agent) under Division 1.5 (Explosives). Chapter 6, “Hazardous Materials Awareness.” United Nations/Department of Transportation (UN/DOT) Hazard Class and Division of Hazardous Materials and Weapons of Mass Destruction (WMD), Class 1. Section 601: 3. See: http://www.tcfp.texas.gov/manuals/curriculum_manual/chapter_6.pdf (accessed on December 28, 2015). 222 AN is mentioned as an example of a Division 5.1 oxidizing substance under U.N./DOT Hazard Class 5. Chapter 6, “Hazardous Materials Awareness,” Section 601: 4. See: http://www.tcfp.texas.gov/manuals/curriculum_manual/chapter_6.pdf (accessed on December 28, 2015). 223 TCFP. Chapter Six, “Hazardous Materials.” Certification Curriculum Manual, effective on June 1, 2010. Based on NFPA 472 (2008 Edition). See: http://www.tcfp.texas.gov/manuals/curriculum_manual/chapter_6.pdf (accessed on December 28, 2015). 224 NFPA, IAFC. Fundamentals of Fire Fighter Skills, 2nd Edition. Burlington, MA: Jones & Bartlett Publishers, 2008. 225 Hazard response knowledge must be retained, and an effective retraining process must be put in place to prevent the loss of its organizational value.

West Fertilizer Company Final Report January 2016 116 U.S. CHEMICAL SAFETY AND HAZARD INVESTIGATION BOARD

  1. 2.5 Lack of Situational Awareness and Risk Assessment Knowledge

Although many firefighter training courses provide overviews of initial fire scene size-up, assessment, incident planning, and execution, CSB found that none of the firefighter HAZMAT field training courses provide sufficient information on firefighter situational awareness and risk assessment that could help them make informed decisions while at the fire scene.226,227 The firefighters who initially responded to WFC did not have the tools to effectively perform the situational awareness and risk assessment that would have enabled them to make an informed decision to not fight the fire. Situational awareness in firefighting involves the capability to “read” the scene of a fire or emergency, including changes in the behavior of a fire. Effective situational awareness supports prompt decision making to either evacuate the scene of a fire or continue fighting the fire by taking a defensive or offensive stance. Chapter 4 of NFPA 472 (Standard for Competence of Responders to Hazardous Materials/Weapons of Mass Destruction Incidents, 2013 Edition) provides guidance on situational awareness competencies for responder-level personnel.228 In fires involving HAZMAT, it is not always possible for firefighters to obtain needed information before acting, but they might be able to characterize a HAZMAT incident based on initial information acquired from the emergency call center and dispatcher; emergency response manuals and guides; knowledge base on the response area; and visual, auditory, and olfactory (odorous) clues. In some cases, the fire department’s standard operating procedures (SOPs) and the level of training of the emergency response crew might be insufficient to respond at the incident scene to changing events and scenarios that were not planned for or anticipated—hence, the need for effective training on situational awareness and risk assessment. Clearly written SOPs would afford fire department trainees the opportunity to read and understand the operational procedures of their fire department. The NIOSH Alert, “Preventing Injuries and Deaths of Fire Fighters,” emphasizes the need for departments to establish and adhere to the firefighting policies and procedures stipulated in the SOPs.229 NFPA 1500 (Fire Department Occupational Safety and Health Program, 2013 Edition230) emphasizes the need for development of a risk management plan, including risk identification of actual and potential hazards. In addition, it states that “fire departments shall prepare and maintain policies and standard operating procedures that document the organizational structure, membership, roles and responsibilities, expected functions, and training requirements.” NFPA 1500 also

226 NFPA, IAFC. Fundamentals of Fire Fighter Skills, 2nd Edition. Burlington, MA: Jones & Bartlett Publishers, 2008. 227 Texas Commission on Fire Protection. Chapter Six, “Hazardous Materials.” Certification Curriculum Manual, effective on June 1, 2010. Based on NFPA 472 (2008 Edition). See: http://www.tcfp.texas.gov/manuals/curriculum_manual/chapter_6.pdf (accessed on December 28, 2015). 228 NFPA. NFPA 472: Standard for Competence of Responders to Hazardous Materials/Weapons of Mass Destruction Incidents, 2013 Edition. Quincy, MA: NFPA, 2013. 229 See: http://www.cdc.gov/niosh/docs/2005-132/pdfs/2005-132.pdf (accessed on December 28, 2015). 230 NFPA. NFPA 1500: Fire Department Occupational Safety and Health Program, 2013 Edition. Quincy, MA: NFPA, 2013.

West Fertilizer Company Final Report January 2016 117 U.S. CHEMICAL SAFETY AND HAZARD INVESTIGATION BOARD

provides guidance on the procedures to initiate and manage operations at the scene of an emergency incident. Moreover, NFPA 1561 (Standard on Emergency Services Incident Management System and Command Safety, 2014 Edition) states that “SOPs shall include the requirements for implementation of the incident management system and shall describe the options available for application according to the needs of each particular situation.”231 Firefighting environments are inherently unpredictable, volatile, and fraught with risk.232 It is therefore important for decisions to be made in a context of changing priorities, uncertain information, and limited resources. Firefighters must be able to rapidly size up233 any situation and create scenarios (or what-ifs) to make quick and informed decisions and predict the nature and behavior of a fire. NFPA 472 (Standard for Competence of Responders to Hazardous Materials/Weapons of Mass Destruction Incidents, 2013 Edition) offers guidance on competencies for ICs. Scene size-up is essential in any emergency situation, especially for HAZMAT incidents.234 This approach includes a thorough overall assessment of the scene and the identification of all possible hazards to ensure the safety of the emergency response crew. CSB concluded that training references and guides on emergency response do not address how to effectively respond to AN-related fires. 7.2.6 Lack of Pre-Incident Planning at Facility The fire department did not have a formal pre-incident planning program for FGAN at WFC. Firefighters responding to the incident were aware of the risks associated with anhydrous ammonia leaking from the tanks and that it could form a toxic flammable cloud that could leave the facility, drift into nearby homes, and potentially explode. Although some responding firefighters knew that FGAN was onsite, they did not anticipate a possible FGAN explosion. Some of the West fire department officials reported that they were aware of the chemicals routinely stored at the WFC, but there was never any formal training to prepare for a fire or chemical emergency. Effective site-specific pre-incident planning for emergency responders is essential to guide initial and subsequent actions while responders are at an emergency. Onsite pre- incident planning might have identified the possible FGAN explosion hazard. CSB did not find evidence of regularly scheduled training exercises to ensure that the WVFD conducted incident pre-planning and facility tours to address fire safety and chemicals onsite. A pre-incident plan must provide clear information on the magnitude of hazards in a chemical plant or business. A competent incident commander (IC) or designated authority must be capable of executing the pre-incident plan, including analyzing the incident, planning the response, implementing the planned

231 NFPA. NFPA 1561: Standard on Emergency Services Incident Management System and Command Safety, 2014 Edition. Quincy, MA: NFPA, 2014. 232 Flin, R. Sitting in the Hot Seat: Leaders and Teams for Critical Incident Management. Chichester: Wiley, 1996. 233 Incident size-up uses ongoing processes of information gathering and analysis that will help the firefighters make quick and informed decisions concerning how better to respond to the incident. 234 NFPA. NFPA 472: Standard for Competence of Responders to Hazardous Materials/Weapons of Mass Destruction Incidents, 2013 Edition. Quincy, MA: NFPA, 2013.

West Fertilizer Company Final Report January 2016 118 U.S. CHEMICAL SAFETY AND HAZARD INVESTIGATION BOARD

response, evaluating progress, retreating from the incident, and terminating the response. The NFPA 235 provides guidance on developing an effective incident response plan methodology for emergency responders.236 NFPA 472 (Standard for Competence of Responders to Hazardous Materials/Weapons of Mass Destruction Incidents, 2013 Edition237) provides guidance on the competencies required for hazardous materials responders (including the IC) involved in pre-incident planning and execution of the plan. The pre-incident plan also must be effectively communicated to other external emergency units in the surrounding areas for times when these agencies are called on for mutual aid. In addition, a pre-incident plan must be systemic and must include a realistic exit and evacuation strategy, especially when a decision is made to not take offensive action at a hazardous materials incident. Pre-incident planning must include all of the HAZMAT onsite. Plans must be put in place to address how to effectively respond to an emergency. NFPA 1620 (Standard for Pre-Incident Planning, 2015 Edition) states that the pre-incident plan “shall identify and document any special hazards recognized by the authority having jurisdiction that present extraordinary life safety challenges, operations challenges, or other challenges to emergency responders.”238 NFPA 1620 further states that the “pre-incident plan should be the foundation for decision making during an emergency situation and provides important data that will assist the IC in developing appropriate strategies and tactics for managing the incident.” This standard also states that the “primary purpose of a pre-incident plan is to help responding personnel effectively manage emergencies with available resources.” Pre-incident planning involves evaluating the protection systems, building construction, building contents, and operating procedures that can affect emergency operations. NFPA 1620 outlines the steps involved in developing, maintaining, and using a pre-incident plan by isolating the incident into pre-incident, incident, and post-incident phases. In the pre-incident phase, for example, the guidance covers factors such as physical elements and site or occupant considerations, protection systems, water supplies, hydrant locations, and special hazard considerations. Building characteristics—including type of construction, materials used, occupancy, fuel load, roof and floor design, and unusual or distinguishing characteristics—should be recorded, shared with other departments that provide mutual aid, and entered into the dispatcher’s computer if possible so that the information is readily available if an incident is reported at the noted address.

235 The NFPA, a nonprofit standards organization, has been developing standards since 1896 that directly affect fire services at the department level. The NFPA produces more than 300 consensus codes and standards intended to minimize the possibility and effects of fire and other risks. The codes are voluntary standards that industry can adopt and that regulatory agencies can enforce once the codes are signed into law. Standards are an attempt by an industry or profession to self-regulate by establishing minimal operating, performance, or safety criteria. See: http://www.nfpa.org/about-nfpa (accessed on December 28, 2015). 236 CSB referred to the most current edition of the NFPA codes and standards throughout this report. 237 NFPA. NFPA 472: Standard for Competence of Responders to Hazardous Materials/Weapons of Mass Destruction Incidents, 2013 Edition. Quincy, MA: NFPA, 2013. 238 NFPA. NFPA 1620: Standard for Pre-Incident Planning, 2015 Edition. Quincy, MA: NFPA, 2015.

West Fertilizer Company Final Report January 2016 119 U.S. CHEMICAL SAFETY AND HAZARD INVESTIGATION BOARD

An adequate pre-incident plan must include, at a minimum, specific tested and practiced procedures for responding to an emergency at a given facility; a list of potential HAZMAT such as FGAN, including the quantity of each chemical that may be onsite; details on HAZMAT handling and storage; chemical locations at a particular site; the likely behavior of chemicals in a fire, flood, or other emergency; worst case scenario regarding how these chemicals might behave or interact in an emergency; the Safety Data Sheet (SDS)239 for each of the HAZMAT; and specific recommendations on how to respond to a fire when these chemicals are involved. Before the incident, the WVFD did not conduct a pre-inspection for an FGAN-related fire emergency. In most cases, a site-specific pre-incident plan would be developed in partnership with each chemical plant or chemical business in the response jurisdiction. Although WFC reported the quantity and location of each of its hazardous chemicals, including FGAN, to the WVFD, no mechanism ensured that pre-incident drills or inspections were conducted. Although the firefighters in West conducted some onsite anhydrous ammonia drills, none of the drills or training focused on the potential of an FGAN-related fire emergency. A fire pre-plan would enable firefighters to determine various situations where conditions could dramatically change in a burning structure. This information would enable them to consider the hazards associated with each site. Also, the pre-incident plan could provide this advanced information, which might have aided the WVFD in developing a response strategy or might have facilitated a decision to stand down and allow the structure to burn to the ground if no lives were endangered by doing so. Whether a volunteer fire department (VFD) has pre-incident plans in place often depends on the individual fire department. Currently, no federal agency regulates municipal fire departments in the United States. Although the U.S. Congress funded the National Institute for Occupational Safety and Health (NIOSH) in 1998 to establish the Fire Fighter Fatality Investigation and Prevention Program, NIOSH only investigates on-the-job firefighter fatalities and makes recommendations for improvements to the profession. NIOSH lacks authority to enforce regulations or mandate firefighter training requirements.240 7.3 Limited and Conflicting Technical Guidance on FGAN Firefighters might not have at their fingertips all of the hazard information regarding the chemicals that can be found in their communities. Regardless of the instant availability of information on the hazards of a specific chemical, firefighters are required to respond immediately upon dispatch and are expected to

239 An SDS is a document developed by the manufacturer of a hazardous chemical product that communicates the hazards of the product. It is required under OSHA’s Hazard Communication Standard. Under this standard, all chemical manufacturers, distributors, or importers must provide to downstream users an SDS for each hazardous chemical. Previously, SDSs were known as Material Safety Data Sheets (MSDS); however, in 2012, the name underwent a change when OSHA decided to modify the Hazard Communication Standard to adopt the U.N. Globally Harmonized System. 240 NIOSH Fire Fighter Fatality Investigation and Prevention Program. See: http://www.cdc.gov/niosh/fire/ (accessed on December 28, 2015).

West Fertilizer Company Final Report January 2016 120 U.S. CHEMICAL SAFETY AND HAZARD INVESTIGATION BOARD

make prompt decisions. To make effective decisions in fire emergencies, some fire prevention and emergency response stakeholders have developed technical manuals and guidebooks. These guidebooks help emergency responders and firefighters to better understand chemical hazards. References include the Emergency Response Guidebook (ERG), SDSs, and NFPA standards.241 Although firefighting manuals support the prevention of injuries and fatalities, CSB found conflicting information and inconsistencies in various emergency response guidelines. 7.3.1 Emergency Response Guidebook The ERG is a readily available and widely used guidebook among the emergency response community. Formerly known as the DOT ERG, this document is now jointly produced by DOT, Transport Canada, and the Secretariat of Communications and Transportation (Mexico). The current ERG is designed as a resource for first responders to consult during the initial phase of a dangerous goods or HAZMAT transportation incident. Emergency response personnel (such as firefighters, EMTs, and police officers) in the United States, Canada, Mexico, and other countries use the ERG when responding to transportation emergencies involving HAZMAT. In most cases, firefighters who complete HAZMAT courses, the most basic of which is Awareness Level training, are expected to be familiar with the ERG. Figure 63 shows the 2012 edition of the ERG.

241 Annex E of NFPA 400 (2013 Edition) also provides AN firefighting guidance. NFPA. NFPA 400: Hazardous Materials Code, 2013 Edition. Quincy, MA: NFPA, 2013.

West Fertilizer Company Final Report January 2016 121 U.S. CHEMICAL SAFETY AND HAZARD INVESTIGATION BOARD

Figure 63. Cover Page of 2012 Edition of ERG (Source: DOT PHMSA)242 Most firefighting apparatuses have a copy of the ERG.243 After the WFC incident, NIOSH investigators found copies of the 2012 ERG in the glove boxes of some of the damaged fire equipment and apparatuses.244 However, CSB does not have any evidence that indicates whether the West firefighters consulted the ERG on the night of the explosion. The ERG is especially useful in situations when the relevant SDS is not readily available to firefighters. The ERG gives direction (based on DOT Hazard Classification Criteria) on response to HAZMAT and dangerous goods emergencies during transportation. It does not provide any specific guidance on the

242 DOT Pipeline and Hazardous Materials Safety Administration (PHMSA). See: http://phmsa.dot.gov/pv_obj_cache/pv_obj_id_7410989F4294AE44A2EBF6A80ADB640BCA8E4200/filename/ER G2012.pdf (accessed on December 28, 2015). 243 DOT. The Emergency Response Guidebook: A Guidebook for First Responders During the Initial Phase of a Dangerous Goods/Hazardous Materials Transportation Incident (ERG), 2012 Edition. See: http://phmsa.dot.gov/staticfiles//PHMSA/DownloadableFiles/Files/Hazmat/ERG2012.pdf (accessed on December 28, 2015). 244 NIOSH. “9 Volunteer Fire Fighters and 1 Off-Duty Career Fire Captain Killed by an Ammonium Nitrate Explosion at a Fertilizer Plant Fire–Texas.” NIOSH Report on Death in the Line of Duty. Report Number F2013-

  1. See: http://www.cdc.gov/niosh/fire/pdfs/face201311.pdf (accessed on December 28, 2015).

West Fertilizer Company Final Report January 2016 122 U.S. CHEMICAL SAFETY AND HAZARD INVESTIGATION BOARD

handling of ammonium fertilizer.245 In fact, the ERG includes the following commentary under the heading of its 2012 Edition: This guidebook will assist responders in making initial decisions upon arriving at the scene of a dangerous goods incident. It should not be considered as a substitute for emergency response training, knowledge or sound judgment. ERG2012 does not address all possible circumstances that may be associated with a dangerous goods incident. It is primarily designed for use at a dangerous goods incident occurring on a highway or railroad. Be mindful that there may be limited value in its application at fixed facility locations.246 The current edition of the ERG lists 15 variations of FGAN. Next to each FGAN variant is a guide number that leads to information on the potential hazard and the appropriate emergency response, but the suggested measures are broad and subject to varying interpretations. On October 1, 2014, CSB provided comments on a DOT request for information (RFI), “Hazardous Materials: Revision of Emergency Response Guidebook” (FR Doc. 2014-20683), which was published on August 29, 2014.247 CSB commented as follows: The ERG is intended for incidents involving the transport of hazardous materials and is limited to the size of the transportation containers involved.248 However, the CSB has found in several investigations249 that the ERG manual was used by emergency responders for incidents involving chemical fires, explosions and releases of hazardous materials at fixed facilities. Incidents at fixed facilities may involve larger quantities of hazardous materials as well as additional hazards involving process conditions or other hazardous chemicals stored nearby, resulting in higher risk to emergency responders. The directions regarding response to a chemical release or fire incident intended for transportation may be different when applied to an incident at a fixed chemical or manufacturing facility. For this reason, the CSB suggests that the DOT consider additional language to clarify ERG’s use limitations at fixed facilities. CSB also urged DOT to highlight in bold text on the front cover page of the next edition of the ERG: “Only Intended for Use When Responding to Transportation Incidents.” Realizing that emergency

245 The ERG provides some information and guidance on handling Division 5.1 oxidizers. 246 DOT. The Emergency Response Guidebook: A Guidebook for First Responders During the Initial Phase of a Dangerous Goods/Hazardous Materials Transportation Incident (ERG), 2012 Edition: 356. See: http://phmsa.dot.gov/staticfiles//PHMSA/DownloadableFiles/Files/Hazmat/ERG2012.pdf (accessed on December 28, 2015). 247 See: http://www.csb.gov/csb-recommends-safety-improvements-to-us-department-of-transportation-emergency- response-guidebook-widely-used-by-firefighters/ (accessed on December 28, 2015). 248 See: http://www.csb.gov/assets/1/7/DOT_ERG__RFI10_1_14.pdf (accessed on December 28, 2015). 249 Technics, Inc., 2003. See: http://www.csb.gov/technic-inc-ventilation-system-explosion/ (accessed on December 28, 2015); DuPont Belle, 2010. See: http://www.csb.gov/dupont-corporation-toxic-chemical-releases/ (accessed on December 28, 2015); Millard Refrigerated Services, 2010. See: http://www.csb.gov/millard-refrigerated-services-ammonia-release/ (accessed on December 28, 2015); AL Solutions, 2010. See: http://www.csb.gov/al-solutions-fatal-dust-explosion/ (accessed on December 28, 2015).

West Fertilizer Company Final Report January 2016 123 U.S. CHEMICAL SAFETY AND HAZARD INVESTIGATION BOARD

responders will continue to reference the ERG for incidents involving HAZMAT releases at fixed facilities, CSB suggested that DOT consider adding guidance such as the information that first responders should obtain and reference when responding to an incident at a fixed facility, such as the company SDSs and submitted Tier II information.250 CSB advised that such guidance also should be in the front section of the ERG (for example, on pages 1 and 2). In addition, CSB suggested that DOT move the user’s guide from page 356 to page 1 or 2 of the next ERG edition to provide users with earlier guidance. CSB also urged DOT to take the following actions: • Review and revise the ERG to remove generic and vague information in the emergency response section of Guide 140 and other ERG sections. • Include a statement that urges emergency responders to reference other sources in addition to the ERG to obtain more detailed instructions when responding to emergency incidents at fixed facilities. First responders should obtain and refer to the company SDSs or submitted Tier II information when responding to an incident at a fixed facility. This information should also be in the introduction of the ERG (for example, on pages 1 and 2). • Revise the ERG to address the unpredictable behavior of fires involving FGAN and the potential for detonation within a very short time frame. DOT should consider recommending a more conservative response to fires involving FGAN by emphasizing firefighter and resident evacuation when the threat is to human lives rather than property. • Revise Guide 140 to include a separate discussion of the properties and behaviors unique to FGAN (such as the potential for detonation within a very short time frame) that might differ from those of other oxidizers covered by Guide 140. On its website, DOT provided a preview of updates for the 2016 Edition of the ERG.251 The link to the ERG updates provided by DOT showed that the review working group on the ERG had made the following changes: • Replaced written instructions on page 1 with a flow chart to show how to use the new ERG (2016). • Expanded the Table of Placards and updated the title to Table of Markings, Labels, and Placards and Initial Response Guide to Use on Scene. • Expanded the Railcar Identification Chart and the Road Trailer Identification Chart to two pages each. • Updated Table 1 and Table 3 based on new toxic inhalation hazard (TIH)252 data and reactivity research.

250 Additional information on Tier II information is noted in Section 8.5 of this report. 251 DOT. “Preview of Updates for the ERG 2016.” See: http://www.phmsa.dot.gov/pv_obj_cache/pv_obj_id_CDF7F93A3E0C2F808D9EA09C262749DAEF400200/filena me/ERG2016_Preview.pdf (accessed on December 28, 2015). 252 TIH is the abbreviation for toxic inhalation hazard. Under the Hazardous Materials Regulations (HMR), 49 CFR Parts 171–180, TIH materials are gases or liquids that are known (or presumed on the basis of tests) to be so toxic to humans as to pose a hazard to health in the event of a release during transportation. See:

West Fertilizer Company Final Report January 2016 124 U.S. CHEMICAL SAFETY AND HAZARD INVESTIGATION BOARD

• Updated pipeline emergency response information. • Added information about Globally Harmonized System of Classification and Labeling of Chemicals (GHS) markings. • Added all new dangerous goods and HAZMAT listed in the U.N. Recommendations on the Transport of Dangerous Goods, 19th Revised Edition. • Added information on emergency response assistance plans applicable in Canada.

Also, DOT provided a snapshot of the cover page of the 2016 edition of the ERG (Figure 64) on its website.

Figure 64. Cover Page of 2016 Edition of ERG (Source: DOT PHMSA)253 CSB noticed (from the preview of the 2016 edition of the ERG), that DOT and other authors of the ERG moved the warning statement, “A Guidebook for First Responders During the Initial Phase of a Dangerous Goods/Hazardous Materials Transportation Incident” from the left side of the cover page of the 2012 edition to the top of the cover page, as recommended by CSB. However, DOT and other authors

https://www.federalregister.gov/articles/2004/08/16/04-18705/hazardous-materials-enhancing-rail-transportation- security-for-toxic-inhalation-hazard-materials (accessed on January 20, 2016). 253 See: http://www.phmsa.dot.gov/staticfiles/PHMSA/ImageCollections/Images/ERG2016_Cover.png (accessed on December 28, 2015).

West Fertilizer Company Final Report January 2016 125 U.S. CHEMICAL SAFETY AND HAZARD INVESTIGATION BOARD

of the ERG did not include the statement “Only Intended for Use When Responding to Transportation Incidents” in bold on the front cover page of the 2016 edition of the ERG, as suggested by CSB in its response to the DOT RFI for the ERG revision.254 Instead, DOT and other ERG authors modified the statement “A Guidebook for First Responders During the Initial Phase of a Dangerous Goods/Hazardous Materials Transportation Incident” to “A guidebook intended for use by first responders during the initial phase of a transportation incident involving dangerous goods/hazardous materials.”255 Note that “transportation incident involving dangerous goods/hazardous materials” is in bold on the cover page of the 2016 edition of the ERG. 7.3.2 Safety Data Sheets CSB did not find any record that the WVFD consulted the SDS for FGAN and other chemicals present at the WFC facility during the incident. After the incident, CSB reviewed the SDS (that was current at the time of the WFC incident) provided by CF Industries and EDC, the manufacturers of the FGAN used at the WFC. The CF Industries SDS for FGAN (SDS Number 004) provided guidance on FGAN hazards in the December 11, 2012, revision of the SDS.256 Under the Hazards Identification, Emergency Overview heading (item three, page 1), CF Industries described FGAN: Strong oxidizer. Contact with combustible material will increase fire hazard. May undergo detonation if heated under confinement causing pressure buildup or if subjected to strong shocks. Solid AN when sensitized or during decomposition may become unstable and/or explosive. When AN is heated to decomposition it may produce vapor which contains nitrogen oxides (NOX). AN is an oxidizer and as such may increase the flammability and/or explosiveness of other substances. Use water to control fires involving AN, if water is compatible with burning material. AN itself is non-flammable. AN can cause irritation to eyes and skin and may be an inhalation discomfort in confined locations.257 Under the Firefighting Measures heading (item five, page 3), CF Industries noted: Flood burning ammonium nitrate fertilizer with large volumes of low pressure water. Do not use salt water, carbon dioxide, dry chemicals or foam extinguishers. Never attempt to smother fire, such as by sealing off, closing a compartment or building doors when fire occurs. Do not add steam. Ammonium nitrate fertilizer does not have the property of spontaneous combustion. Fire fighters should wear approved self-contained breathing apparatus to protect themselves from the

254 See: http://www.csb.gov/csb-recommends-safety-improvements-to-us-department-of-transportation-emergency- response-guidebook-widely-used-by-firefighters/ (accessed on December 28, 2015). 255 See: http://www.phmsa.dot.gov/staticfiles/PHMSA/ImageCollections/Images/ERG2016_Cover.png (accessed on December 28, 2015). 256 CF Industries has since removed its December 11, 2012, SDS for FGAN from its website. CF industries replaced the December 11, 2012, SDS for FGAN with a revised and updated SDS for FGAN (April 23, 2013). See: http://www.cfindustries.com/pdf/Ammonium-Nitrate-Amtrate-MSDS.pdf (accessed on January 20, 2016). On May 15, 2015, CF Industries published its current SDS for Amtrate FGAN fertilizer, which supersedes every other SDS. See: http://www.cfindustries.com/pdf/Amtrate_AN_Fertilizer_SDS_NA_FINAL.pdf (accessed on December 28, 2015). 257 CF Industries LLC. “Safety Data Sheet, FGAN.” SDS Number 004, revised December 11, 2012.

West Fertilizer Company Final Report January 2016 126 U.S. CHEMICAL SAFETY AND HAZARD INVESTIGATION BOARD

toxic fumes of decomposing ammonium nitrate, and protective clothing to guard against molten nitrate splashes should also be worn.258 This SDS for FGAN referred to NFPA 400 (Hazardous Materials Code, 2013 Edition) under its section on handling and storage but not in its section on firefighting measures. Although Chapter 11 of NFPA 400 provided some recommendations for safe storage, handling, and use of AN, it did not include any specific guidelines on FGAN firefighting measures. Annex E of NFPA 400 outlined some general procedures and suggestions on firefighting for FGAN incidents. Section E.2.1 of Annex E of the 2013 edition of NFPA 400 states: [S]hould a fire break out in an area where FGAN is stored, it is important that the mass be kept cool and the burning be promptly extinguished. Apply large volumes of water as quickly as possible. If fires reach massive and uncontrollable proportions, fire-fighting personnel should evacuate the area and withdraw to a safe location.259 Also, Section E.2.2 of NFPA 400 suggested the provision of as much ventilation as possible to the fire area.260 Although the FGAN SDS provided by CF Industries contained some useful insights and guidance on how to respond to FGAN-related fires, it did not clearly define “a distance” from which a fire could be “flooded” (one of the special firefighting procedures) and did not specify what “volumes of low pressure water” would be needed. CSB compared the firefighting measures in the CF Industries and EDC SDS with those in the SDS provided by a similar large technical grade AN (TGAN) manufacturer (Orica)261 and with those in the current edition of the DOT ERG (Table 9). Table 9. Comparison of Various AN-Related Firefighting Measures in April 2013 EDC SDS (FGAN) CF Industries SDS (FGAN) Orica AN SDS (TGAN) DOT ERG (2012 Edition) If confined when an ignition occurs, an explosion may occur. FGAN may undergo detonation if heated under confinement. FGAN may explode under confinement and high temperature. FGAN may explode from heat or contamination. Flood with water. Flood fire area from a distance. Fires should be fought from a protected location. Flood large fire with water from a distance.

258 Ibid. 259 NFPA. NFPA 400: Hazardous Materials Code, 2013 Edition. Quincy, MA: NFPA, 2013. 260 Ibid. 261 According to its website, Orica is the largest provider of commercial explosives and blasting systems to the mining and infrastructure markets, a global leader in the provision of ground support in mining and tunneling, and a leading supplier of sodium cyanide for gold extraction. See: http://www.orica.com/About-Us#.VlXviHarSUk (accessed on December 28, 2015).

West Fertilizer Company Final Report January 2016 127 U.S. CHEMICAL SAFETY AND HAZARD INVESTIGATION BOARD

Firefighters should wear proper protective equipment and self- contained breathing apparatus. For massive fires, use unmanned fire nozzles; if this is impossible, withdraw from area, and let burn. A major fire may involve a risk of explosion. For massive fire, use unmanned hose holders or monitor nozzles; if this is impossible, withdraw from area and let fire burn.

These examples of guidance for fighting fires involving FGAN illustrate hazards that were broadly defined and were not clearly communicated to emergency responders. The use of vague and broad terminologies in some of the guidelines compared in Table 9 indicates that the behavior of FGAN under heat and confinement is not clearly understood because no standardized methods are used to communicate the hazards of FGAN and possible firefighting procedures to emergency responders. Also, terms such as “massive,” “major,” “large,” “protected location,” and “distance” were not clearly defined in the guidelines. The CF Industries SDS and the ERG suggested “flooding” a fire involving FGAN from a distance, and the Orica SDS suggested fighting such fires from a “protected location.” The EDC SDS instructed firefighting personnel to flood with water but did not address the need to extinguish fires from a distance or to evacuate under massive fire situations. In these guidelines, the safe distance or protected location is not clearly defined. Hence, a firefighter must make a judgment to determine which location or area is protected, which distance is safe enough to fight a fire involving FGAN, how much water is needed for flooding, and which fire is massive or major. Unfortunately, firefighters are often forced to make these decisions without adequate training, information, preparation, and pre-planning. The WFC incident highlighted the need for greater awareness of FGAN hazards. In response to the 2013 explosion, EDC updated its SDS to include more information about the explosive hazards of AN and information for firefighters. The revised EDC SDS now advises firefighters to fight AN fires remotely because of the risk of explosion. If an AN-containing structure is fully engulfed in flames, firefighters are instructed not to fight the fire and to evacuate the surrounding area to at least a one-half-mile radius.262 7.4 Lessons Not Learned and Lessons Learned 7.4.1 Pre-West-Incident FGAN-Related Fires and Explosions: Lessons Not Learned CSB found that lessons learned from previous firefighter fatalities and emergency responses to FGAN- related incidents were not effectively disseminated to firefighters and emergency responders in other communities where FGAN is stored or used. Had those lessons been applied to the very similar situation

262 See: www.eldoradochemical.com/MSDS_Sheets/EDC/EDC_Products/EDCC_AN_Prill_SDS_Information_Bulletin_No v_2014.pdf (accessed on December 28, 2015).

West Fertilizer Company Final Report January 2016 128 U.S. CHEMICAL SAFETY AND HAZARD INVESTIGATION BOARD

in West, the firefighters and emergency responders might have better understood the risks associated with FGAN-related fires. Although the firefighters in West knew of the hazards associated with the tanks of anhydrous ammonia as a result of previous releases, they were not alert to the explosion hazard from the FGAN inside the warehouse. Although FGAN itself does not burn, the conditions under which AN might detonate when exposed to fire are unpredictable and not clearly understood, and current guidance does not offer consistent advice on how to attempt to guarantee firefighter safety. The deaths of the volunteer firefighters and emergency responders in West was not the first time that firefighters have been killed when responding to FGAN-related explosion incidents. On April 16, 1947, a ship containing 7,000 tons of wax-coated FGAN263 exploded in the port of Texas City, Texas, killing 581 people, including all 26 Texas City firefighters who responded to the incident.264 The November 29, 1988, Kansas City, Missouri, ammonium nitrate/fuel oil (ANFO) incident, although not directly related to an FGAN fire, is worth mentioning because of its severity, the important lessons learned from the incident, and its implication for emergency response. Six firefighters from the Kansas City, Missouri, fire department were killed in an explosion while they were extinguishing a fire at a construction site.265 About 40 minutes later, a second explosion occurred, followed by several minor explosions. Investigators later learned that after the first explosion, the battalion chief immediately pulled back and prevented other firefighters from entering the area. A command post was set up at a safe distance, which ultimately prevented more firefighter casualties. The initial fire involved a trailer/magazine containing blasting mixtures of FGAN, fuel oil, and aluminum pellets. One end of the trailer contained approximately 3,500 pounds of ANFO mixture while the remainder of the load was approximately 17,000 pounds of ANFO mixed with 5 percent aluminum pellets. In addition, a second explosion rocked another trailer/magazine loaded with approximately 1,000 30-pound sacks of ANFO mixture with 5 percent aluminum pellets.266 Both explosions in Kansas City created large craters where the two trailers had been parked, similar to the impact of the explosion in West. The first trailer explosion produced a swimming-pool-like crater that

263 Although the Texas City incident involved a form of wax-coated FGAN that is no longer manufactured for fertilizer purposes and a form of strong confinement (the locked hull of a ship), the lessons of confinement were developed and incorporated into industry guidance after the Texas City incident. 264 See: https://www.txdps.state.tx.us/dem/temo/archives/2013/Vol60No4/Articles/article2.htm (accessed on December 28, 2015). 265 The Texas City incident is discussed in this section to indicate that firefighters have lost their lives in the past because of a lack of pre-incident planning, inadequate training and information, and erroneous knowledge of the hazards with which they were dealing. The same observation applied to Kansas City, even though it was an ANFO incident; firefighters were not equipped with the right information and had inadequate knowledge of the hazards of the explosive material (ANFO) that they dealt with that evening, and they lost their lives as a result. 266 USFA. “Six Firefighter Fatalities in Construction Site Explosion; Kansas City, Missouri.” Technical Report Series,” USFA-TR-024, November 1988. See: http://www.usfa.fema.gov/downloads/pdf/publications/tr024.pdf (accessed on January 20, 2016).

West Fertilizer Company Final Report January 2016 129 U.S. CHEMICAL SAFETY AND HAZARD INVESTIGATION BOARD

was 80 feet in diameter with a depth of 8 feet, connected to a smaller crater that was 20 feet in diameter and 6 feet deep. The second trailer explosion gouged a crater approximately 100 feet in diameter and 8 feet deep, similar in dimensions to the crater resulting from the explosion in West, Texas. The Kansas City incident investigation determined that the firefighters were not told specifically about the contents of the trailer/magazine, although the dispatcher did caution them about explosives on the site. The firefighters did not report any indication of the presence of warning placards on the trailers because there was no requirement by firefighters to report the presence or absence of warning placards over the radio upon their arrival at a scene of a fire. Also, it was not clear whether the firefighters realized that the trailers housed an explosive magazine.267 No record of communication among the dispatch official, fire chief, and firefighters indicated that the firefighters knew the contents of the magazine, and the firefighters did not seem alarmed when they arrived at the site. In addition, the fire department was not aware of the presence of the trailers/magazines or their contents before the incident because of a lack of jurisdictional authority. The Kansas City Fire Prevention and Protection Code did not require the city engineer to notify the fire department that blasting permits had been issued, although this provision was changed immediately after the incident. The Kansas City Fire Department had no authority or responsibility to inspect the construction site because it was a state enclave.268 Shortly after the Kansas City explosions, the USFA produced a technical report (USFA-TR- 024/November 1988)269 with findings of its investigation and lessons learned. Although the fertilizer- related incidents in Texas City and West did not involve explosives per se, the Kansas City incident further illustrated that the lack of knowledge about the stored HAZMAT and the lack of pre-incident planning by firefighters before their response led to the fatalities. Most of the recommendations based on lessons learned emphasized the need to be properly prepared through pre-incident planning and through the provision of clear information to firefighters and emergency responders dealing with fires involving HAZMAT. CSB observed that within the last 6 years, three notable FGAN-related incidents in Texas involved emergency responders. Subsequently, CSB reviewed the emergency response activities associated with the FGAN-related fires that occurred in 2009 at the EDC facility in Bryan, Texas, and in 2014 at the East Texas Ag Supply facility in Athens, Texas. On Thursday, July 30, 2009, at about 11:40 am CDT, a fire broke out at the EDC facility in Bryan. The EDC facility stores FGAN and blends it with other materials to create fertilizer. The fire at the EDC fertilizer plant led to the evacuation of more than 80,000 residents in the Bryan and College Station area.

267 An explosive magazine is an enclosed storage structure for holding explosives. 268 A state enclave is any portion of a state that is completely surrounded by the territory of another state. 269 USFA. “Six Firefighter Fatalities in Construction Site Explosion; Kansas City, Missouri.” Technical Report Series,” USFA-TR-024, November 1988. See: http://www.usfa.fema.gov/downloads/pdf/publications/tr024.pdf (accessed on January 20, 2016).

West Fertilizer Company Final Report January 2016 130 U.S. CHEMICAL SAFETY AND HAZARD INVESTIGATION BOARD

Although the storage structure burned to the ground, unlike the incident at the WFC facility, no explosion, loss of life, or major injuries were recorded. At Bryan, the firefighters were informed that a welder had accidentally heated an FGAN bin and that the chemical was smoldering. The firefighters decided not to fight the fire, evacuated the area, and let the facility burn to the ground, without any explosion. Their knowledge of FGAN and the risks associated with a probable explosion most likely led the Bryan firefighters to decide to evacuate. Figure 65 shows the post-incident aerial view of the EDC facility wooden fertilizer warehouse.

Figure 65. Post-Incident Aerial View of EDC Facility Wooden Fertilizer Warehouse (Source: Bryan-College Station Eagle) After the incident, the Bryan Fire Department—in conjunction with the emergency management divisions for Brazos County, the city of Bryan, the city of College Station, and Texas A&M University—performed an emergency review and analysis and released an after-action report and improvement plan. These documents were shared with fire departments and emergency response agencies that were involved in the incident response and investigation, including local and regional emergency response agencies—mostly

West Fertilizer Company Final Report January 2016 131 U.S. CHEMICAL SAFETY AND HAZARD INVESTIGATION BOARD

in the Brazos Valley area, where Brazos County, the cities of Bryan and College State, and Texas A&M University are located—and other state agencies that responded to the incident.270 The 2009 EDC fire after-action report for Brazos Valley highlighted the need for emergency response departments to reflect on protection, response, and recovery activities that occurred during the EDC incident, despite the fact that the community-wide response to the incident resulted in no loss of life or serious injuries. In addition, the after-action report identified potential strengths to be maintained and built on, noted potential areas for further improvement, and suggested recommendations for corrective and preventive actions based on the incident. The after-action report indicated: The Texas Division of Emergency Management provides the National Emergency Response and Rescue Training Center (NERRTC) funding to develop regional plans that will enable local emergency management to rapidly respond to disasters using the region’s resources before requesting assistance from State and Federal partners. Within that scope, NERRTC also develops after-action reports on behalf of local, regional and state governments that have been affected by major disasters. As in the case of the EDC fire, lessons learned help recognize needs for plans, policies and procedures revisions to enhance the effectiveness of response (personnel, teams and/or equipment).271 Unfortunately, CSB did not find any record that the WVFD requested or received a copy of the Brazos Valley after-action report and improvement plan. In addition, no record suggested that lessons learned from the EDC incident were discussed or shared with firefighters at West.272 Although circumstances in West might have differed from those in Bryan, if lessons learned had been effectively relayed among the firefighters at West, the volunteer firefighters who responded to the WFC incident possibly could have drawn on the experience of Bryan firefighters to inform response strategies, both in the pre-planning stages and in the response to the incident on the night of April 17, 2013. 7.4.2 Post-West Incident FGAN-Related Fire: Lessons Learned On May 29, 2014, at around 5:45 pm, a fire involving FGAN occurred at the East Texas Ag Supply facility in downtown Athens, Texas. Emergency dispatchers and the Athens Police Department promptly notified firefighters from the Athens Fire Department (AFD).273 Emergency response units from the AFD arrived on the scene of the fire at 5:50 pm and found fire and smoke coming from the northwest end of the 3,500-square-foot East Texas Ag Supply facility. This facility was built with masonry bricks and combustible wooden structures, similar to construction at the WFC facility.274 The AFD chief arrived

270 EDC. “2009 El Dorado Chemical Fire After-Action Report for Brazos Valley,” August 11, 2009. 271 Ibid. 272 CSB found that several surviving West firefighters interviewed after the WFC incident did not have adequate information about the EDC incident at Bryan (approximately 100 miles south of West, Texas). 273 The AFD was organized as a volunteer department in 1911. Currently, the AFD is a fully paid fire department with two stations and 27 firefighters. See: http://athenstexas.us/fire.cfm (accessed on December 28, 2015). 274 Shortly after the April 17, 2013, incident at the WFC facility in West, Texas, an investigative reporter from the Dallas news station (WFAA) entered the Athens facility with a camera crew and revealed that East Texas Ag Supply

West Fertilizer Company Final Report January 2016 132 U.S. CHEMICAL SAFETY AND HAZARD INVESTIGATION BOARD

about 2 minutes after the first responding units were dispatched to the site of the incident, and he found that the fire had self-ventilated at the northwest end. On the basis of his observation of the enormous scope of the fire and the possibility of detonation of FGAN in the engulfed building, the fire chief promptly decided to let the East Texas Ag Supply facility burn to the ground instead of attempting to fight the fire.275 He ordered his firefighters to retreat from the scene and began an extensive evacuation of the downtown Athens, Texas, area. The Athens Police Department coordinated the evacuation of the nearby residential areas, setting up an initial three-block evacuation perimeter, which was later expanded to five blocks.276 Fortunately, no injuries were associated with this incident. On June 2, 2014, the State Fire Marshal’s Office (SFMO) completed its investigation of the East Texas Ag Supply facility incident and released its findings, ruling and classifying the source of the fire as undetermined.277 The East Texas Ag Supply facility was a privately owned business with annual revenues estimated between $10 million to $20 million and a work force of approximately nine employees. The East Texas Ag Supply facility was an FGAN and potash fertilizer storage facility, and it was registered under Standard Industrial Classification Code 5191 (Farm Supplies) and North American Industry Classification System (NAICS) Code 424910 (Farm Supplies Merchant Wholesalers).278 On the day of this incident, the East Texas Ag Supply facility received approximately 70 tons of FGAN (total) and 100,000 pounds of potash, which were stored inside the building when the fire occurred. CSB gathered information concerning the East Texas Ag Supply incident from the emergency responders and the facility and also conducted an interview with the AFD fire chief. According to the incident statement provided to CSB, the Athens, Texas, fire chief stated: We allowed the fire to mitigate itself, with research showing that some such facilities had burned out with no explosions. We had learned a lot from West and had already removed other products that could cause contamination and had made the owner remove his diesel tractor from within the building and to keep it off site when not in use. We feel this was a major deterrent from having a detonation.279 Figure 66 and Figure 67 show photographs of the East Texas Ag Supply facility during the fire incident.

was receiving and storing the same substance thought to have been involved in the explosion in West. See: http://www.wfaa.com/story/news/local/investigates/2014/08/18/14029198/ (accessed on December 28, 2015). 275 According to the Athens, Texas, fire chief, the initial plan of action was to engage the fire at the incipient stage, but by the time he arrived on scene, the chief knew that the fire was well past the incipient stage and that the quantity of water needed to squelch the fire at that stage was beyond the capabilities of the equipment on hand. He gave the order for his men to cease firefighting based on his early observations and to begin evacuation activities. 276 The City of Athens police chief was in charge of the evacuation and the control of traffic. The police chief set the initial evacuation perimeter at three blocks from the facility based on the immediate resources available to the police chief at that time; the perimeter subsequently was expanded to five blocks. Police and fire personnel conducted the evacuation notification by using their public address systems and going door to door. 277 See: http://www.tdi.texas.gov/news/2014/news201443.html (accessed on December 28, 2015). 278 After the WFC incident in West, the city of Athens, Texas, received a lot of attention because of the presence of a fertilizer storage facility downtown that was similar to and older than the WFC facility. Wooden bins were used for storage of AN at the East Texas Ag Supply facility. 279 The fire incident statement was provided to CSB via email on October 3, 2014, by the Athens, Texas, fire chief.

West Fertilizer Company Final Report January 2016 133 U.S. CHEMICAL SAFETY AND HAZARD INVESTIGATION BOARD

Figure 66. Dark Grey Smoke280 Originating from East Texas Ag Supply Facility in Downtown Athens, Texas (Source: Athens Fire Department)

280 However, this smoke was not as black as the smoke from the WFC fire (see Section 4 of this report).

West Fertilizer Company Final Report January 2016 134 U.S. CHEMICAL SAFETY AND HAZARD INVESTIGATION BOARD

Figure 67. Dark Smoke Combined with Flames at East Texas Ag Supply Facility in Athens, Texas281 (Source: Athens Fire Department) In an interview, the fire chief reported that the AFD conducted extensive pre-planning, visited the East Texas Ag Supply fertilizer storage facility on multiple occasions, and instructed the owner of the facility to repair anything that seemed to be hazardous or noncompliant with the International Fire Code, which the city of Athens adopted in 2009. SFMO officials had also visited the facility previously on at least two occasions and compelled the owner of the East Texas Ag Supply facility to fix old broken machinery that was onsite.282 In addition to these visits from SFMO, AFD officials often toured the facility to randomly inspect loading and unloading operations and to take note of other fire safety issues, including the location and spacing of exits within the facility. Pre-incident assessment of the facility indicated that the fertilizer storage bins were old and constructed of double layer plywood, each about 10 feet from the ceiling of the 35- to 40-foot-tall building, with three of the bins used to store FGAN. Similar to the WFC facility in West, the East Texas Ag Supply facility had no sprinkler systems, and the building was

281 At the East Texas Ag Supply facility incident in Athens, Texas, the flame appeared to be the normal yellow color of many wood and other combustibles burning in normal air. Unlike the WFC incident, there was no detonation of FGAN; hence, no evidence of brighter (higher-temperature) white flame was observed before the detonation at West (see Section 4 of this report). 282 In addition to the actions taken by the city of Athens before the East Texas Ag Supply fire on May 29, 2014, the SFMO—as part of its endeavors to share the lessons learned from the West, Texas, AN explosion—went to all 66 counties with businesses that had 10,000 pounds or more of AN. The statewide tour started on December 12, 2013, and was completed on December 17, 2014. Local first responders, LEPC members, local officials, business staff, and citizens were invited to the public meetings organized by the SFMO. On April 3, 2014, the SFMO visited Athens, Texas (Henderson County) to enlighten the public on the hazards of FGAN. See: http://www.tdi.texas.gov/fire/fman.html (accessed on December 28, 2015).

West Fertilizer Company Final Report January 2016 135 U.S. CHEMICAL SAFETY AND HAZARD INVESTIGATION BOARD

constructed with masonry brick walls on three sides, covered with an asphalt shingle roof. Figure 68 shows the East Texas Ag Supply facility, including its masonry brick walls completely burned to the ground.

Figure 68. East Texas Ag Supply Facility’s Masonry Brick Walls, Engulfed by Fire and Smoke (Source: Athens Fire Department) The Athens community has two community alert systems, CodeRED and FIRST Alert. The CodeRED community alert system was developed to notify residents of any emergency. The FIRST Alert system is directed from the Henderson County 911 dispatch center.283 The protocol for use of the CodeRED system indicates that during any emergency situation or a fire incident, the fire chief or a designee (usually the police chief) would give the order for the CodeRED notification. Once a CodeRED order is given, the designee or authorized emergency staff member is expected to make a recorded speech, which is then broadcast over the Internet and to all landline telephones in the city. The process also notifies mobile phone subscribers. The CodeRED system was not deployed during the East Texas Ag Supply incident to notify Athens residents. 284 However, the CodeRED alert system was used the following day (May 30, 2014) to notify the community about the post-incident status of the East Texas Ag Supply facility and the conditions surrounding that facility. The Athens, Texas, fire chief compared the city’s situation to that in West and stated that the AFD conducted additional research and identified how best to respond to any emergency situation that could

283 Athens, Texas, is located in Henderson County, about 70 miles southeast of Dallas, Texas. 284 On the day of the incident, there was no clear communication on the designation of the appropriate party to make the outgoing emergency notification message. The fire chief maintained that because he was occupied with command firefighting operations, the task of making the announcement should have been transferred to the Athens Police Department (police chief); unfortunately, this was not the case. Moving forward with the post-incident critique, the fire chief indicated that standardizing the designation of who makes the announcement would be better defined for future community notifications.

West Fertilizer Company Final Report January 2016 136 U.S. CHEMICAL SAFETY AND HAZARD INVESTIGATION BOARD

arise because of the East Texas Ag Supply facility. In West, the WFC plant was primarily a fertilizer facility, with anhydrous ammonia tanks, carts, loaders, insecticides, and other potential contaminants for FGAN. On the basis of the aftermath of the WFC explosion in West, Henderson County reviewed its existing local emergency planning committee (LEPC) process. About a year before the Athens fire incident, the natural disaster planning LEPC was expanded, with the fire chief as its chair, to address emergencies arising from human activities or industrial facilities. Although the cause of the Athens fire incident has not been determined, the city of Athens initiated reforms aimed at protecting the city from another incident in the future. On May 29, 2015, a year after the fire at the East Texas Ag Supply facility, the city passed an ordinance that banned the bulk storage of FGAN in Athens. The ordinance included a mandatory reporting process for facilities with limited quantities of hazardous chemicals such as FGAN so that they would report the quantities of the hazardous chemicals in their facilities, thereby enabling VFDs to conduct inspections at such facilities.285 CSB investigators conducted a teleconference with the city of Athens fire chief on June 24, 2015. The fire chief stated that the East Texas Ag Supply facility had been torn down and will not be rebuilt within the Athens city limits. In addition, Athens is now considering efforts aimed at monitoring other hazardous chemicals (similar to FGAN) that are currently stored by facilities within the city limits.286 7.5 Other Post-Incident Investigation Reports Related to Firefighting After the fire and explosion at the WFC facility, several other agencies conducted investigations of the incident. EPA and OSHA conducted their investigations for violations of environmental and workplace safety and health laws, while the Texas SFMO and NIOSH conducted their investigations on the firefighters and the emergency response at the WFC facility. The ATF investigation of the WFC incident is ongoing. 7.5.1 Texas State Fire Marshal’s Office (SFMO) The SFMO 287 served as the lead Texas investigatory agency for the WFC incident, working in collaboration with ATF.288 On May 15, 2014, the SFMO released its line-of-duty deaths investigation of the West, Texas, incident, “Firefighter Fatality Investigation” (Investigation FFF FY 13-06).289 The SFMO report described the incident and issued recommendations focused on the emergency response to the WFC incident, including the conditions that led to the fire and explosion. The report indicated that the firefighters at West were not prepared for what they faced on the night of April 17, 2013. Also, the

285 Section 8.7.3 of this report discusses the Athens City ordinance in detail. 286 Section 8.7 of this report addresses state and local regulatory developments (post-West, Texas, and Athens, Texas, incidents). 287 See: http://www.tdi.texas.gov/fire/documents/fmohistory.pdf (accessed on December 28, 2015). 288 Section 1.2.1 of this report addresses the ATF investigation. 289 See: http://www.tdi.texas.gov/reports/fire/documents/fmloddwest.pdf (accessed on December 28, 2015).

West Fertilizer Company Final Report January 2016 137 U.S. CHEMICAL SAFETY AND HAZARD INVESTIGATION BOARD

SFMO highlighted that the emergency responders were victims of a “systemic deficiency in the training and preparation” of the WVFD, attempting to put out a fire that was beyond its incipient stage290 and could no longer be extinguished. The report also included findings related to training and operational best practices for firefighters. On page 47, the SFMO report identified training deficiency as a key finding: The State of Texas has not adopted minimum training standards for volunteer fire departments; however, all fire department members must be properly trained and qualified to perform their assigned duties. Members who are authorized to work in high-level assignments (rank) must be trained and evaluated in performing those duties. All members must be periodically re-evaluated to ensure that they are capable of performing their assigned duties safely and effectively.291 The SFMO firefighter fatality report on the WFC incident further proposed several recommendations based on training of firefighters, including establishment of “realistic training and educational requirements for all positions and ranks and a promotional process that ensures that ranking members demonstrate a progressive knowledge, skill, and ability to perform their assigned duties and responsibilities according to their position in the organization.” The SFMO report concludes by recommending that “fire departments should develop standard operating guidelines and appropriate training involving those critical findings specific to incident command, strategy and tactics, and firefighter safety.”292 The SFMO report findings and recommendations are similar to those of CSB in this report with regard to the emergency response in West. Section 7.2 of this report describes in detail pre-incident planning, fire scene risk assessment, and development of a clearly defined incident command structure for emergency situations.293 7.5.2 NIOSH Findings and Recommendations In 1998, the U.S. Congress funded NIOSH to establish the Fire Fighter Fatality Investigation and Prevention Program, which investigates on-the-job fatalities of firefighters and provides improvement recommendations to the profession.294 On November 12, 2014, NIOSH released its report on the emergency responder fatalities caused by the WFC explosion.295 The report, “9 Volunteer Fire Fighters and 1 Off-Duty Career Fire Captain Killed by an FGAN Explosion at a Fertilizer Plant Fire–Texas,” identified contributing factors to the firefighter fatalities, specifically failure to recognize hazards associated with FGAN, limited pre-incident planning of the commercial facility, quick spread of the fire

290 The term “incipient” has been widely used in the firefighting community and in various fire codes, including NFPA codes. However, CSB believes that it could be easily misinterpreted and imposes on firefighters a responsibility to make a subjective determination regarding the seriousness of a fire. 291 See: http://www.tdi.texas.gov/reports/fire/documents/fmloddwest.pdf (accessed on December 28, 2015). 292 Ibid. 293 Section 7.1 of this report considers the firefighter response and Section 7.2 discussed details of factors contributing to the firefighter and other emergency responder fatalities in West, Texas. 294 See: www.cdc.gov/niosh/fire (accessed on December 28, 2015). 295 See: http://www.cdc.gov/niosh/fire/pdfs/face201311.pdf (accessed on December 28, 2015).

West Fertilizer Company Final Report January 2016 138 U.S. CHEMICAL SAFETY AND HAZARD INVESTIGATION BOARD

to uncontrollable size, unexpected detonation of approximately 40 to 60 tons of solid FGAN, emergency responders working within the blast radius at the time of the explosion, and large non-sprinklered wood construction in the commercial structure.296 In addition, NIOSH issued recommendations to prevent a similar incident from recurring. Recommendations included pre-incident planning inspections of facilities within the jurisdiction of a fire department; development of a written risk management plan; fire department use of risk management principles at all structure fires, especially for incidents involving high-risk hazards; development, implementation, and enforcement of a written incident management system to be applied during all emergency incident operations; standards for firefighters to wear a full array of turnout clothing and personal protective equipment (PPE) appropriate for the assigned tasks; and firefighter training that meets or exceeds NFPA 1001 (Standard for Fire Fighter Professional Qualifications). CSB concluded that most of the key contributing factors and recommendations cited by NIOSH in its WFC incident investigation report are similar to those of CSB.297 7.6 Summary of Incident Emergency Response CSB found no evidence of pre-incident planning addressing the likelihood of a fire involving FGAN at the WFC facility. As a result, the firefighters who responded to the WFC fire did not take the time to critically assess the situation on the ground before the explosion occurred. Senior emergency response personnel from the WVFD arrived at the scene of the incident at different times, and firefighters who were ICS trained and certified in the NIMS process did not assume the role of IC to establish, implement, and coordinate an incident command structure and incident management system for the fire emergency. The firefighters did not fully understand the hazards of FGAN detonation and consequently shifted their firefighting tactics to strategies to ensure that the anhydrous ammonia tanks onsite did not rupture. Also, the emergency response personnel at West did not take the time to implement an incident management system plan, which would have facilitated the prompt and proper evacuation of the nearby residents. The volunteers who responded to the WFC facility fire did not have sufficient HAZMAT training to make an informed decision on how best to respond to the fire at the fertilizer facility. Furthermore, lessons learned from previous firefighter fatalities and emergency responses to FGAN-related incidents were not effectively disseminated to firefighters and emergency responders in other communities, such as West, where FGAN is stored or used. A review of firefighter training courses, information in emergency response guides, manufacturers’ manuals, and other information available to emergency responders concerning AN-related fires at incident sites confirms that such materials place little emphasis on how to effectively respond to fire

296 NIOSH. “9 Volunteer Fire Fighters and 1 Off-Duty Career Fire Captain Killed by an Ammonium Nitrate Explosion at a Fertilizer Plant Fire–Texas.” NIOSH Report on Death in the Line of Duty. Report Number F2013-

  1. See: http://www.cdc.gov/niosh/fire/pdfs/face201311.pdf (accessed on December 28, 2015).

297 Ibid.

West Fertilizer Company Final Report January 2016 139 U.S. CHEMICAL SAFETY AND HAZARD INVESTIGATION BOARD

incidents involving the handling and storage of FGAN and might altogether be insufficient to enable firefighters to recognize the potential magnitude of an FGAN explosion. The commonly used emergency response guides and manuals contain inconsistent information regarding the best response to FGAN- related fires. In a fire situation, an FGAN explosion could occur at any time, and without knowing how long an AN-related fire has been burning, firefighters might not be aware of how much time they have to make informed emergency response decisions before an explosion occurs. That is why in the DECIDE model widely used by HAZMAT responders, after it is determined that HAZMAT is present, the next step is to estimate likely harm, without intervention.298 Above all, the conditions under which FGAN might detonate when exposed to a fire are unpredictable and not clearly understood, and current guidance does not offer best practices to protect firefighters from FGAN fire and detonation hazards. 7.7 Firefighter Training Grants and Programs 7.7.1 Need for Training CSB found that currently no federal requirements compel municipal fire departments to develop site- specific pre-incident plans with businesses and chemical plants that process and store HAZMAT such as FGAN. To implement any reform in nationwide inspection of businesses and facilities storing hazardous chemicals, determining the number of fire departments and firefighters in the United States (especially in rural communities such as West, Texas) is important. In addition, it is important to understand how prepared fire departments and firefighters should respond to fires involving FGAN. Part of being prepared is being properly trained on the hazards surrounding a community. 7.7.1.1 U.S. Firefighter Statistics CSB conducted a review of firefighter statistics across the country at the time of the WFC fire and explosion. The review indicated that the majority of the nation’s firefighters are volunteers and that 85 percent of fire departments are composed of volunteer firefighters. In addition, the NFPA estimated the number of firefighters in the United States in 2013 at more than a million, including 345,600 career firefighters (31 percent of the total) and 786,150 volunteer firefighters (69 percent of the total).299 Approximately 95 percent of all volunteer firefighters serve in local fire departments that protect fewer than 25,000 people.300 More than half of these volunteer firefighters support small rural departments that protect fewer than 2,500 residents, such as the WVFD in West, Texas.301 At the end of 2012, an estimated 30,100 fire departments operated in the United States. Of these, 2,610 (9 percent of all departments) were composed of only career firefighters; 1,995 (7 percent) relied on mostly career

298 Ludwig Benner. “D.E.C.I.D.E in Hazardous Materials Emergencies.” See: http://www.henrycoema.org/EMA/HazMat_Training_Materials_files/DECIDE.pdf (accessed on January 8, 2016). 299 See: http://www.nfpa.org/research/reports-and-statistics/the-fire-service (accessed on December 28, 2015). 300 Ibid. 301 Ibid.

West Fertilizer Company Final Report January 2016 140 U.S. CHEMICAL SAFETY AND HAZARD INVESTIGATION BOARD

firefighters; 5,445 (18 percent) were supported by a mostly volunteer firefighting force; and 20,050 (67 percent) depended entirely on volunteer firefighters.302 Despite the fact that the majority of the nation’s firefighters are volunteers and that 85 percent of fire departments are composed of volunteers, no federal requirements mandate that VFDs work with businesses and chemical plants that process and store HAZMAT (such as FGAN) to develop site-specific pre-incident plans. 7.7.1.2 U.S. On-Duty Firefighter Fatalities Over the last few decades, the fire service industry has made notable advancements, including building code improvements, incorporation of sprinkler systems in commercial and industrial buildings, and development of improved personal protective gear and technologically advanced apparatus. In addition, several laws and programs have been implemented to improve firefighter health and safety in the United States.303,304,305 Despite these laws and improvements, many firefighters are injured or killed while on duty each year. The USFA has recorded the number of firefighter fatalities and conducted an annual analysis since 1977, noting almost 4,500 on-duty firefighter fatalities in the United States in the last 35 years.306 By the end of 2013, 101 firefighter fatalities were reported for the year nationally, including those in West, Texas; four Houston Fire Department firefighters who died while responding to a hotel fire on May 31, 2013; and 19 firefighters from the Prescott Fire Department who lost their lives while responding to a wildland fire in Arizona on June 30, 2013. The NFPA also publishes its own annual study detailing on-duty firefighter fatalities in the United States.307 The annual number of fatalities for volunteer firefighters is substantially higher than the annual number of fatalities for career firefighters (Figure 69).

302 NFPA, Fire Analysis and Research Division. “US Fire Department Profile 2012.” See: http://www.kolb.net/FireReports/2013/US_DeptProfile2012.pdf (accessed on December 28, 2015). 303 Fabio, A. et al. “Incident-level risk factors for firefighter injuries at structural fires.” Journal of Occupational and Environmental Medicine, 44(11) (2002): 1059–63. 304 NFPA. NFPA 1500: Standard on Fire Department Occupational Safety and Health Program. Quincy, MA: NFPA, 2013. 305 Moore-Merrell, L. et al. Contributing Factors to Firefighter Line-of-Duty Injury In Metropolitan Fire Departments in the United States. Emmitsburg, MD: USFA, 2008. 306 USFA. See: http://www.usfa.fema.gov (accessed on December 28, 2015). 307 NFPA. “U.S. Fire Service.” See: http://www.nfpa.org/research/fire-statistics/the-us-fire-service (accessed on December 28, 2015).

West Fertilizer Company Final Report January 2016 141 U.S. CHEMICAL SAFETY AND HAZARD INVESTIGATION BOARD

Figure 69. Comparison of Volunteer and Career Firefighter Deaths (1977–2013) (Source: NFPA)308 This discrepancy could be due to a number of factors, such as the larger population of volunteer firefighters (more than 67 percent of all firefighters nationwide) or the lack of standardized training requirements for volunteers. Of the 82 firefighter fatalities in 2012, 39 were volunteer firefighters (47.6 percent of the total), and 32 were career firefighters (39 percent of the total); in addition, four part-time wildland firefighters, three contract wildland firefighters, two paid on-call firefighters, one part-time (paid) firefighter, and one industrial firefighter lost their lives (1.2 percent of the total). CSB believes that adequate training is essential to reduce on-the-job firefighter fatalities, especially among volunteer firefighters who are not required to complete the same level of training as career firefighters. 7.8.1.3 U.S. Volunteer Firefighter Statistics A VFD is a fire department composed of volunteers, usually residents or nearby citizens, who perform fire suppression and other related emergency services for a local jurisdiction or community. The U.S. Department of Labor (DOL) classifies volunteer firefighters as firefighters who receive either no compensation or nominal fees (up to 20 percent of the compensation that a full-time firefighter would receive in the same capacity).309 DOL allows volunteer firefighters to receive benefits such as worker’s compensation, health insurance, life insurance, disability insurance, pension plans, length-of-service

308 See: http://nysfma.org/diyFiles/FirefighterFatalitiesinttheUS2013.pdf (accessed on December 28, 2015). 309 Dodge, G., and M. Mullarkey. Managing Volunteer Firefighters for FLSA Compliance: A Guide for Fire Chiefs and Community Leaders. Fairfax, VA: International Association of Fire Chiefs, 2006.

West Fertilizer Company Final Report January 2016 142 U.S. CHEMICAL SAFETY AND HAZARD INVESTIGATION BOARD

awards, and property tax relief. DOL also states that volunteer firefighters may be paid nominal fees on a per-call or per-shift basis or on the basis of various service requirements, but they may not be compensated based on productivity (such as receiving an hourly wage). Career firefighters are fully compensated for their services. Some volunteer firefighters might serve in a hybrid fire department that relies on both full-time and volunteer firefighters. In this approach, career firefighters can regularly staff a station for rapid response with needed apparatuses, and the volunteers can provide supplementary staffing and staff apparatuses before, during, and after an incident or while full- time career personnel are out of service for training. Moreover, volunteer firefighters can sometimes compose a group of part-time or on-call firefighters who have other occupations when not engaged in occasional firefighting. The West volunteer firefighters held other (full-time) jobs and were not financially compensated for their time. Some VFDs compensate their firefighters as employees during the time that they are responding to or attending to an emergency scene and possibly during training. An on-call firefighter can also volunteer time for other nonemergency duties, such as training, fundraising, and equipment maintenance. In addition to fundraising, fire departments and emergency response services often seek alternative sources to support and fund their daily operations and long-term plans. Federal and state funding is available through grants from DHS and FEMA to assist emergency responders and fire departments in addressing EMS and firefighter-related needs such as training and equipment procurement and maintenance. National programs that support the need for emergency preparedness, including firefighter training, are discussed in the next section of this report. 7.7.2 National Firefighter Training Funds and Programs 7.7.2.1 U.S. Department of Homeland Security (DHS) DHS was formed after the terrorist attacks of September 11, 2001, as part of a national effort to safeguard the United States against terrorism. The mission of DHS includes preventing terrorism and enhancing security, managing U.S. borders, administering immigration laws, securing cyberspace, and ensuring disaster resilience. DHS also provides the coordinated comprehensive federal response in the event of a terrorist attack, natural disaster, or other large-scale emergency while working with federal, state, local, and private sector partners to ensure a swift and effective recovery effort. DHS builds a ready and resilient nation through efforts to accomplish the following: • Bolstering information sharing and collaboration. • Providing grants, plans, and training to homeland security and law enforcement partners. • Facilitating rebuilding and recovery.310 Although the scope of DHS is expansive, it contains many components, including FEMA, where much of the federal funding flows to various FEMA programs that assist in elements of national resiliency, such as

310 See: http://www.dhs.gov/building-resilient-nation (accessed on December 28, 2015).

West Fertilizer Company Final Report January 2016 143 U.S. CHEMICAL SAFETY AND HAZARD INVESTIGATION BOARD

rebuilding and recovering after a disaster (such as the West, Texas, incident) or encouraging emergency response preparedness training. Federal Emergency Management Agency (FEMA) FEMA was created in 1979 in an effort to coordinate the federal government’s role in preparing for, preventing, mitigating the effects of, responding to, and recovering from all domestic disasters, whether natural or man-made, including acts of terror.311 On March 1, 2003, FEMA became part of DHS, and FEMA’s Office of National Preparedness was given responsibility for helping to ensure that the nation’s first responders were trained and equipped to deal with WMD along with other types of disasters. FEMA supports preparedness by developing policies; ensuring that adequate plans are in place and are validated; defining the necessary capabilities required to address threats; providing resources and technical assistance to state, local, tribal, and territorial partners; and integrating and synchronizing preparedness efforts throughout the nation. DHS and FEMA achieve their mission of ensuring disaster resiliency partly by providing funding and support to various federal programs that are tasked with preparing the nation to respond to various hazards, such as community exposure to chemicals and hazardous materials. Fire departments use the programs to assist in developing a well-organized, equipped, and trained function for the communities they serve. CSB reviewed the nationwide funding mechanisms available to career and VFDs through DHS and FEMA. Volunteer firefighters similar to those who responded at West have access to these firefighting resource funds if they can demonstrate that they have a need for it. CSB examined whether federal and state funds could be allocated to fire departments to assist them in obtaining the training that firefighters need to address fires and explosions involving HAZMAT such as FGAN. Grants It is important to understand the process for allocating grants to emergency responders such as fire departments. First, this section discusses the application process for a DHS FEMA grant. Second, the FEMA Grant Programs Directorate (GPD), the program that administers these grants once they receive proposals from applicants for funding is discussed. Third, the DHS FEMA preparedness (non-disaster) grants are described. Fourth, the Assistance to Firefighter Grants (AFG) Program is discussed in detail and in relation to funding in Texas. Specifically, the AFG, Staffing for Adequate Fire and Emergency Response (SAFER) grants, and the Fire Prevention and Safety (FP&S) grants are examined. DHS FEMA Grants Application Process Often federal grant funding flows to the local level through the states. However, some states provide direct funding for emergency medical services (EMS), especially in rural areas. On the other hand, some states have no funding for local programs. Most SFMOs and EMS bureaus offer technical assistance to

311 See: http://www.fema.gov/about-agency (accessed on December 28, 2015).

West Fertilizer Company Final Report January 2016 144 U.S. CHEMICAL SAFETY AND HAZARD INVESTIGATION BOARD

local agencies and subsidized training programs to first responders.312 A large portion of the federal grant budget is passed to the states through formula or block313 grants. The states then decide how to use the grant money. However, some direct federal grant programs are for fire departments and EMS agencies such as the AFG.314 Direct grants are given specifically to the applying agency, but pass-through grants315 require the state to apply to the federal government and then distribute grant money to agencies that request it. Project grants are the most common form of federal grant. Depending on the program requirements, EMS organizations gain access to the funds through a competitive bidding process. Application for a project grant does not guarantee an award, and the amount received by grantees is not predetermined by a formula.316 Although most DHS components possess some programs that support grants,317 FEMA has the majority of programs and funding.318 FEMA Grant Programs Directorate (GPD) The purpose of FEMA GPD is to strategically and effectively administer and manage FEMA grants to ensure critical and measurable results for customers and stakeholders. The mission is to manage federal assistance to measurably improve capability and reduce the risks that the nation faces in times of man- made and natural disasters. The focus of GPD is to provide customer service to all grantees as well as internal and external partners; establish and promote consistent outreach and communication with state, local, and tribal stakeholders; ensure transparency in the grant process; and enhance the nation’s level of preparedness and the public’s capability to prevent, protect, mitigate against, respond to, and recover from all hazards. GPD also holds program management responsibility for the suite of preparedness grants that included, and continue to include, the following goals and objectives: • Review, negotiate, award, and manage the FEMA preparedness grant portfolio. • Provide subject matter expertise in response to regional office and stakeholder inquiries. • Develop grant guidance. • Formulate risk methodology to support grant allocations. • Analyze investments. • Manage budget execution and formulation.

312 FEMA and USFA. “Funding Alternatives for Emergency Medical and Fire Services.” FA-331, April 2012. 313 A block grant does not involve competition. The federal government distributes funds to the states based on an established formula. 314 The AFG Program is discussed in further detail in the Assistance to Firefighters Grant Program Section of this report. 315 Funds issued by a federal agency to a state agency or institution that are then transferred to other state agencies, units of local government, or other eligible groups, per the award eligibility terms. 316 FEMA and USFA. “Funding Alternatives for Emergency Medical and Fire Services.” FA-331, April 2012. 317 DHS supports a wide variety of financial assistance, including post-disaster relief and resilience, preparedness, boating safety, cybersecurity, research, university centers of excellence, and assistance to firefighters. 318 See: http://www.dhs.gov/dhs-financial-assistance (accessed on December 28, 2015).

West Fertilizer Company Final Report January 2016 145 U.S. CHEMICAL SAFETY AND HAZARD INVESTIGATION BOARD

• Provide the driving force for grant management initiatives through the strategic delivery of policy, training, systems, and data analysis.319 The GPD carries out its mission through three divisions, including the GPD Front Office, Grant Operations Division, and Preparedness Grant Division.320 The FEMA grants that pertain to firefighter training and emergency response are discussed in the Preparedness (Non-Disaster) Grants and Assistance to Firefighters Grant Program Sections of this report. Preparedness (Non-Disaster) Grants FEMA provides state and local governments with preparedness program funding in the form of Non- Disaster Grants to enhance the capacity of state and local emergency responders to prevent, respond to, and recover from a WMD terrorism incident involving chemical, biological, radiological, nuclear, and explosive (CBRNE) devices and cyber attacks.321 The Emergency Management Performance Grant (EMPG) Program is a preparedness grant that provides more than $350 million to assist local, tribal, territorial, and state governments in enhancing and sustaining all-hazards emergency management capabilities.322 Either the State Administrative Agency (SAA) or the state’s Emergency Management Agency (EMA) is eligible to apply directly to FEMA for EMPG Program funds on behalf of state and local EMAs.323 The fiscal year (FY 2015) EMPG Program will focus on planning, operations, equipment acquisitions, training, exercises, construction, and renovation to enhance and sustain the all-hazards core capabilities of state, local, tribal, and territorial governments.324 The period of performance for the EMPG Program is 24 months. In FY 2015, the EMPG Program allocated $20,163,325 to the state of Texas.325 Assistance to Firefighters Grant Program Within FEMA, the AFG Program consists of three types of grants326 that support improvements in training, staffing, and safety within fire departments. These grants include the AFG, FP&S grants, and SAFER grants:

319 See: https://www.fema.gov/grant-programs-directorate (accessed on October, 23, 2015). 320 The Preparedness Grant Division includes the Preparedness (Non-Disaster) Grants. 321 See: https://www.fema.gov/preparedness-non-disaster-grants (accessed on October, 22, 2015). 322 See: http://www.dhs.gov/news/2015/07/28/dhs-announces-grant-allocations-fiscal-year-fy-2015-preparedness- grants (accessed on October 22, 2015). 323 See: http://www.fema.gov/media-library-data/1427284579730- 8faafd19a62444a974429c3e12d803fa/FY2015EMPG_FAQ.pdf (accessed on December 28, 2015). 324 See: http://www.fema.gov/media-library-data/1438020444107- 4db58a4f1c24b3bd0962b8327652df5b/FY_2015_EMPG_Fact_Sheet_Allocations.pdf (accessed on October 22, 2015). 325 See: http://www.fema.gov/media-library-data/1438020444107- 4db58a4f1c24b3bd0962b8327652df5b/FY_2015_EMPG_Fact_Sheet_Allocations.pdf (accessed on November 25, 2015) 326 The AFG Program also includes Assistance to Firefighters Fire Station Construction Grants.

West Fertilizer Company Final Report January 2016 146 U.S. CHEMICAL SAFETY AND HAZARD INVESTIGATION BOARD

• AFG. The primary goal of the AFG Program is to meet the firefighting and emergency response needs of fire departments and nonaffiliated EMS organizations. Since 2001, the AFG Program has helped firefighters and other first responders to obtain critically needed equipment, protective gear, emergency vehicles, training, and other resources needed to protect the public and emergency personnel from fire and related hazards.327 AFGs are awarded to fire departments, state fire training academies, and EMS organizations. • SAFER Grants. The SAFER Grants were created to provide funding directly to fire departments and volunteer firefighter interest organizations to help them increase the number of trained frontline firefighters available in their communities. The goal of SAFER is to enhance the local fire departments’ capabilities to comply with staffing, response, and operational standards established by the NFPA (NFPA 1710, NFPA 1720, or both).328 • FP&S Grants. The FP&S Grants are part of the AFG Program and support projects that enhance the safety of the public and firefighters from fire and related hazards.329 The primary goal is to reduce injury and prevent death among high-risk populations. In 2005, Congress reauthorized funding for FP&S Grants and expanded the eligible uses of funds to include firefighter safety research and development.330 In FY 2014, the AFG provided more than $300 million in grant money nationwide; of this $300 million, Texas received approximately $6.5 million. The AFG Program issued 2,243 individual grants nationwide, and of those, only 90 grants were to fire departments for the purpose of training firefighters.331 Moreover, in FY 2014, the AFG Program awarded grant money to 40 firefighting and EMS organizations in Texas to provide aid for much needed resources (Figure 70). Of those 40 Texas organizations, 20 career fire departments, but only 14 VFDs, were awarded funding through the AFG Program. The remaining six organizations include emergency service organizations and one state fire training academy. Notably, an interesting finding is that of the grants awarded in Texas, only one award was specific to training personnel while the majority of the awards were used to fund equipment, PPE, facility modifications, vehicle acquisitions, and wellness and fitness programs.

327 See: http://www.fema.gov/welcome-assistance-firefighters-grant-program (accessed on December 28, 2015). 328 See: http://www.fema.gov/staffing-adequate-fire-emergency-response-grants (accessed on December 28, 2015). 329 See: http://www.fema.gov/welcome-assistance-firefighters-grant-program (accessed on December 28, 2015). 330 See: http://www.fema.gov/fire-prevention-safety-grants (accessed on December 28, 2015). 331 See: http://www.fema.gov/assistance-firefighters-grants-award-year-2014 (accessed on October 21, 2015).

West Fertilizer Company Final Report January 2016 147 U.S. CHEMICAL SAFETY AND HAZARD INVESTIGATION BOARD

Organization City State Program Award Amount Activity Breakdown Award Date Martindale Volunteer Fire Dept. Co. Martindale TX Operations and Safety $46,196.00 Personal Protective Equipment ($48,005) 4/24/2015 Northwest Rural Emergency Medical Services Association, Inc. Tomball TX Operations and Safety $160,572.00 EMS Equipment ($168,600) 4/24/2015 Sulphur Springs Fire Rescue Sulphur Springs TX Operations and Safety $57,143.00 Modify Facilities ($60,000) 4/24/2015 Devine Volunteer Fire and Rescue Department Devine TX Operations and Safety $23,982.00 Equipment ($24,056) 5/8/2015 Farmers Branch Fire Department Farmers Branch TX Operations and Safety $223,773.00 Personal Protective Equipment ($246,150) 5/22/2015 Frankston Volunteer Fire Department Frankston TX Operations and Safety $80,000.00

Equipment ($45,900) || Personal Protective Equipment ($38,100) 5/22/2015 City of Paris Fire Department Paris TX Operations and Safety $11,632.00 Equipment ($12,795) 5/29/2015 Commerce Fire Department Commerce TX Operations and Safety $153,048.00 Personal Protective Equipment ($160,075) 5/29/2015 Texas Engineering Extension Service (TEEX) College Station TX State Fire Training Academy $265,243.00 Equipment ($265,600) 6/19/2015 Hitchcock Volunteer Fire Department Hitchcock TX Operations and Safety $160,667.00 Personal Protective Equipment ($167,500) 7/3/2015 Leander Fire Department Leander TX Operations and Safety $22,719.00 Wellness and Fitness Programs ($6,540) 7/10/2015 San Marcos Fire Department San Marcos TX Regional Request $707,546.00 Equipment ($778,300) 7/10/2015 Troup Volunteer Fire Dept Troup TX Vehicle Acquisition $238,096.00 Vehicle Acquisition ($250,000) 7/10/2015 Bonham Fire Department Bonham TX Vehicle Acquisition $663,713.00 Vehicle Acquisition ($696,898) 7/24/2015 Glenn Heights Fire Department Glenn Heights TX Operations and Safety $78,858.00 Personal Protective Equipment ($82,800) 7/24/2015 Houston Fire Department Houston TX Operations and Safety $915,120.00 Training ($1,008,732) 7/24/2015 Itasca Fire Department Itasca TX Vehicle Acquisition $103,621.00 Vehicle Acquisition ($108,802) 7/24/2015 Burnet County Emergency Services District No. 9 Spicewood TX Operations and Safety $72,000.00 Personal Protective Equipment ($75,600) 7/31/2015 Apple Springs Volunteer Fire Dept Apple Springs TX Operations and Safety $53,143.00 Personal Protective Equipment ($55,800) 8/14/2015 Mic-County Volunteer Fire Department Lockhart TX Regional Request $399,637.00 Equipment ($423,600) 8/14/2015 Orange County Emergency Services District #1 Vidor TX Operations and Safety $173,993.00 Personal Protective Equipment ($191,392) 8/14/2015 Anna Fire Department Anna TX Operations and Safety $28,572.00 Modify Facilities ($30,000) 8/21/2015 Cash Fire Department Assoc. Inc. Greenville TX Operations and Safety $71,760.00 Equipment ($74,355) 8/21/2015 City of Palestine Fire Department Palestine TX Operations and Safety $170,667.00 Personal Protective Equipment ($179,200) 8/21/2015 City of Terrell Fire Department Terrell TX Operations and Safety $246,215.00

Modify Facilities ($65,700) || Personal

Protective Equipment ($139,500) || Wellness and Fitness Programs ($53,325) 8/21/2015 eastex freeway volunteer fire department humble TX Operations and Safety $73,119.00 Equipment ($80,430) 8/21/2015 Elm Mott Volunteer Fire and Rescue Elm Mott TX Operations and Safety $31,429.00 Equipment ($33,000) 8/21/2015 Kilgore Fire Department Kilgore TX Operations and Safety $158,364.00 Personal Protective Equipment ($174,200) 8/21/2015 Comanche Volunteer Fire Department Comanche TX Operations and Safety $116,071.00 Personal Protective Equipment ($121,374) 8/28/2015 Sanger Volunteer Fire Department Sanger TX Operations and Safety $36,364.00 Equipment ($40,000) 8/28/2015 Tarkington Volunteer Fire Department Cleveland TX Operations and Safety $62,858.00 Personal Protective Equipment ($66,000) 8/28/2015 Kingsville Fire Department Kingsville TX Vehicle Acquisition $362,728.00 Vehicle Acquisition ($399,000) 9/4/2015 Muenster Volunteer Fire Department Muenster TX Operations and Safety $78,572.00 Personal Protective Equipment ($82,500) 9/4/2015 Richland Hills Fire Rescue Richland Hills TX Operations and Safety $41,214.00 Equipment ($43,274) 9/4/2015 Stafford, City of Stafford TX Operations and Safety $152,728.00 Personal Protective Equipment ($168,000) 9/4/2015 Quitman Fire & Rescue Quitman TX Operations and Safety $111,429.00 Personal Protective Equipment ($117,000) 9/11/2015 CITY OF WEBSTER WEBSTER TX Operations and Safety $23,620.00 Equipment ($24,800) 9/18/2015 Garland Fire Department Garland TX Operations and Safety $18,730.00 Equipment ($20,400) 9/18/2015 Van Alstyne Fire Department Van Alstyne TX Operations and Safety $33,387.00

Modify Facilities ($23,500) || Equipment ($10,056) 9/18/2015 Centerville Volunteer Fire Dept., Inc Centerville TX Operations and Safety $97,381.00 Personal Protective Equipment ($102,250) 9/25/2015 $6,525,910.00 Assistance to Firefighters Grant Program (AFG) FY 2014 Award Recipients Last Updated: 9/25/2015 - www.fema.gov/firegrants/ TOTAL

Figure 70. Assistance to Firefighter Grant Program Recipients in Texas (Source: FEMA) In FY 2014, the awarded SAFER Grants totaled approximately $11.7 million to five fire departments in Texas to increase the number of trained firefighters; of these five departments, only one was a VFD (Figure 71). Similarly, the awarded FP&S Grants totaled approximately $1.5 million to two organizations in Texas, neither of which were fire departments, to support projects that enhance the safety of the public and firefighters from fire and related hazards (Figure 72).

West Fertilizer Company Final Report January 2016 148 U.S. CHEMICAL SAFETY AND HAZARD INVESTIGATION BOARD

Figure 71. SAFER Grant Award Recipients in Texas (Source: FEMA)

Figure 72. FP&S Grant Recipients in Texas (Source: FEMA) On the basis of the analysis of the FEMA FY 2014 funding allocation to fire departments throughout the nation, it can be concluded that much of the grant monies went toward non training-related support. Given the constraints that many VFDs experience regarding funds to support training, fire departments should express a greater interest in also applying for federal grants for training purposes and not solely for supporting other firefighting-related needs such as equipment. For this reason, FEMA should develop a grant that specifically supports firefighter training needs and cannot be used toward funding other resource needs such as equipment or PPE. DHS FEMA Programs A general understanding of the intricate landscape of federal grant programs also enables a better understanding of many of the DHS and FEMA programs specific to training. This section describes the various components and programs that promote preparedness at a national level. First, the FEMA National Preparedness Directorate (NPD) serves as a mechanism for fostering programs and resources. Second, training programs reside within the National Training and Education Division (NTED). Third, the Homeland Security National Training Program (HSNTP) is positioned to create accessible training and specifically addresses national preparedness gaps. Fourth and fifth, the Center for Domestic Preparedness (CDP) and the Rural Domestic Preparedness Consortium (RDPC) are NTED training

West Fertilizer Company Final Report January 2016 149 U.S. CHEMICAL SAFETY AND HAZARD INVESTIGATION BOARD

partners. Sixth, the USFA role as a leader in firefighter training is reviewed. Each is discussed in detail in the rest of this section. National Preparedness Directorate (NPD) The NPD is an organizational component of FEMA that provides the doctrine, programs, and resources to prepare the nation to prevent, protect, mitigate, respond to, and recover from disasters while minimizing the loss of lives, infrastructure, and property.332 A variety of courses in all-hazards emergency planning and response constitutes a key aspect of building a culture of preparedness and involves training at many levels, including: • State, local, tribal, and territorial elected officials. • Emergency managers. • First responders. • Appropriate whole community members, such as volunteer organizations, Community Emergency Response Teams, Citizen Corps, and bystanders. • Other emergency responders. Through the NPD, FEMA has established and delivered effective training and professional education programs and developed a national certification system for overall emergency management competency and expertise. This work is accomplished by the National Emergency Training Center (NETC), CDP, and other training partners.333 National Training and Education Division (NTED) NTED serves the nation’s first responder community, offering more than 150 courses to help build critical skills that responders need to function effectively in mass consequence events. NTED primarily serves state, local, and tribal entities in 10 professional disciplines, but has expanded to serve the private sector and citizens as well. Instruction is offered at the awareness, performance, and management and planning levels. Emergency responders attend NTED courses to learn how to apply the basic skills of their profession in the context of preparing, preventing, deterring, responding to, and recovering from acts of terrorism and catastrophic events. Training partners or providers that develop and deliver NTED approved training courses include: • CDP. • Counterterrorism Operations Support. • Louisiana State University. • New Mexico Institute of Mining and Technology.

332 See: http://www.fema.gov/national-preparedness-directorate (accessed on December 28, 2015). 333 See: http://www.dhs.gov/topic/plan-and-prepare-disasters (accessed on December 28, 2015).

West Fertilizer Company Final Report January 2016 150 U.S. CHEMICAL SAFETY AND HAZARD INVESTIGATION BOARD

• Texas Engineering Extension Service.334 • Transportation Technology Center, Inc. • University of Hawaii, National Disaster Preparedness Training Center. Other training partners, such as the following, have developed or are developing training courses for NTED: • BCFS Health and Human Services. • Frederick Community College. • International Association of Fire Fighters.335 • Naval Postgraduate School. • RDPC.336 NTED training partners deliver training at no cost to the individual or to the individual’s jurisdiction or agency. In some circumstances, with approval from the SAA state/territory training point of contact, Homeland Security Grant Program (HSGP) funds 337 may be used for overtime and backfill costs for those individuals attending NTED courses. Training providers have a limited supply of training for each state. Occasionally, a state exhausts the available free training. In these cases, NTED has an Excess Delivery Acquisition Program that allows NTED training partners to charge for course delivery when more sessions of a requested class are needed than the grant funds can accommodate. Select training partners potentially could support training firefighters on the hazards associated with FGAN fires, as discussed in further detail. NTED courses include multiple delivery methods, specifically instructor-led (direct), train-the-trainers (indirect), customized (conferences and seminars), and web-based deliveries. Instructor-led courses are offered in residence (i.e., at a training facility) or through mobile programs that deliver courses to state and local jurisdictions that request the training. While the GPD, Grant Operations Division manages, administers, and conducts application budget review, creates the award package, approves, amends and closes out awards, the NPD NTED holds programmatic responsibility for the HSNTP Continuing Training Grants (CTG) Program and also maintains the program management function and responsibilities throughout the life cycle of the awarded grant.338

334 TEEX currently has an 8-hour course delivered in any participating jurisdiction that focuses on training responders to meet the requirements established in NFPA 472, Chapter 4, “Competencies for Awareness Level Personnel,” and the OSHA 29 CFR 1910.120 (q)(6)(i) (a–f) First Responder Awareness Level competencies. This course takes an all-hazards approach to HAZMAT incidents. It provides participants with the knowledge to recognize the HAZMAT, protect themselves, notify others, and secure the scene. As part of a DHS FEMA funded HSNTP Cooperative Agreement, this course is available at no direct cost to state, county, and local government agencies. 335 Section 7.7.3.1 of this report provides additional information about the IAFF. 336 RDPC is discussed in further details in the Rural Domestic Preparedness Consortium Section of this report. 337 HSGP funds can be used to reimburse the state agency or local jurisdiction for delivery of, and attendance to, the course. 338 DHS, HSNTP, CTG Program. “Notice of Funding Opportunity.” DHS-15-NPD-005-000-01.

West Fertilizer Company Final Report January 2016 151 U.S. CHEMICAL SAFETY AND HAZARD INVESTIGATION BOARD

Homeland Security National Training Program, Continuing Training Grants The FY 2015 HSNTP CTG program339 provides funding via cooperative agreements340 to training partners to develop and deliver training to prepare whole communities to prevent, protect against, mitigate, respond to, and recover from acts of terrorism and from natural, man-made, and technological hazards. An objective of the program is to create accessible training solutions to address specific national preparedness gaps across the country. For FY 2015, the total HSNTP funds available under the CTG Program is $11.521 million, to be used for training in the following focus areas: • Cybersecurity. • HAZMAT. • Countering violent extremism. • Rural training. The FY 2015 HSNTP CTG Program is an open and competitive funding opportunity, available to entities with existing programs or demonstrable expertise relevant to the focus areas in the funding opportunity announcement—including state, local, tribal, and territorial entities; nonprofit national associations and organizations; nonprofit higher education institutions; and nonprofits such as community and faith-based organizations. HAZMAT and rural training are two focus areas of interest to this investigation because fire departments with HAZMAT or FGAN facilities in their jurisdiction (or those in rural341 locations) can apply for this grant since they fall under these focus areas. Within the HAZMAT focus area, departments are required to identify current and emerging national gaps in HAZMAT incident planning, response, and recovery as well as the training solutions to address these gaps. The FY 2015 HSNTP CTG Program prescribed the following standards related to HAZMAT training: NFPA standards, including NFPA 472 (Standard for Competence of Responders to Hazardous Materials /Weapons of Mass Destruction Incidents), NFPA 473 (Standard for Competencies for EMS Personnel Responding to Hazardous Materials/Weapons of Mass Destruction Incidents), and 29 CFR 1910.120 (Hazardous Waste Operations and Emergency Response). In addition, Executive Order 13650, “Improving Chemical Facility Safety and Security,” and published reports from the Chemical Facility Safety and Security Working Group have been incorporated. The proposed training should address the following issues:

339 As appropriated by the Department of Homeland Security Appropriations Act, 2015 (Pub. L. 114-4) and authorized by the Implementing Recommendations of the 9/11 Commission Act of 2007 (Pub. L. 110-53) (hereafter the 9/11 Act), and the Homeland Security Act of 2002 (6 U.S.C. § 101 et seq.). 340 A legal instrument of financial assistance between a federal awarding agency or pass-through entity and a non- federal entity that is consistent with 31 U.S.C. 6302–6305. 341 The U.S. Census Bureau defines rural areas as all areas not meeting the following definition of a metropolitan area: Metropolitan statistical area (MSA) must include at least one city with 50,000 or more inhabitants or an urbanized area with at least 50,000 inhabitants and a total MSA population of at least 100,000.

West Fertilizer Company Final Report January 2016 152 U.S. CHEMICAL SAFETY AND HAZARD INVESTIGATION BOARD

• Planning, response and mitigation strategies, defensible critical decision making to save lives and property, and actions for fixed-facility spills and releases. • Increasing knowledge, skills, and abilities to achieve core capabilities of interdiction and disruption, on-scene security and protection, and operational communications and coordination to enhance a jurisdiction’s capability to mitigate and respond to HAZMAT incidents. • Responder health and safety to prepare for, respond to, and recover from HAZMAT incidents by including on-scene health risk assessments and hazard risk analysis, incident safety and health plans, air monitoring plans, PPE selection and use, and safe work practices. Many VFDs similar to the WVFD are situated in rural environments where the funding to support training is limited. The required training objectives for the rural training focus area include HAZMAT, mass fatality planning and response, crisis management for school-based incidents, development of emergency operations plans, railcar safety, agroterrorism and food and animal safety, and media engagement strategies for first responders.342 Center for Domestic Preparedness CDP opened in June 1998 as a training center for the nation’s emergency responders. The CDP mission is to train emergency response providers from state, local, and tribal governments as well as the Federal government, foreign governments, and private entities, as available. CDP training is also available for international, federal, and private sector responders who may participate if space is available on a fee-for- service basis. The scope of training includes preparedness, protection, and response. CDP provides onsite and mobile training at the performance, management, and planning levels while also facilitating the delivery of training by DHS training partners. DHS fully funds CDP training for state, local, and tribal responders. CDP has three distinct facilities that support training, specifically the Chemical, Ordnance, Biological, and Radiological Training Facility (COBRATF), Advanced Responder Training Complex (ARTC), and Noble Training Facility. The CDP COBRATF offers the only program in the nation featuring civilian training exercises in a toxic chemical agent environment, including biological materials. The advanced hands-on training enables responders to effectively respond to real-world incidents involving chemical, biological, explosive, or radiological materials or other HAZMAT. The ARTC provides responders with a realistic training environment to exercise the skills acquired during training. The CDP Noble Training Facility is the nation’s only hospital dedicated solely to preparing the health care, public health, and environmental health communities for mass casualty events related to terrorism or natural disasters. CDP’s federal training partners include agencies such as: • Emergency Management Institute (EMI). • National Fire Academy (NFA). • Federal Law Enforcement Training Centers.

342 DHS HSNTP CTP Program. “Notice of Funding Opportunity (NOFO),” DHS-15-NPD-005-000-01.

West Fertilizer Company Final Report January 2016 153 U.S. CHEMICAL SAFETY AND HAZARD INVESTIGATION BOARD

• Center for Disease Control and Prevention. • Veterans Administration. • DHS Office for Bombing Prevention. • Radiological Emergency Preparedness Program. • Department of Agriculture. • DHS Domestic Nuclear Detection Office. • Health and Human Services Division of Strategic National Stockpile. Rural Domestic Preparedness Consortium (RDPC) Rural emergency responders face unique challenges compared to their urban counterparts, such as limited access to funding for fundamental training. These challenges in providing consistent and high-quality training for first responders were recognized by Congress and DHS, which then established RDPC. Led by the Center for Rural Development, RDPC is a DHS-funded program providing training and resources to rural first responders. RDPC develops and delivers relevant all-hazards training specific to rural environments, and courses are offered both in person and online at no cost. To ensure that training directly reflects the needs of rural emergency responders, RDPC convenes a national rural preparedness summit and completes a biannual national survey of rural stakeholders. Data gathered from these activities are used to determine the type of training needs, level of need, and best delivery methods.343 U.S. Fire Administration (USFA) The USFA is currently an entity within FEMA. The USFA was established by the Federal Fire Prevention and Control Act of 1974. 344 The mission of the USFA is to provide leadership, coordination, and support for the nation’s fire prevention and control, fire training and education, and EMS activities and to prepare first responders and health care leaders to react to all-hazard and terrorism emergencies. One of USFA’s key objectives is to reduce the nation’s loss of life from fire while also reducing property loss and nonfatal injury due to fire.345 The USFA develops and delivers fire prevention and safety education programs in partnership with other federal agencies, the fire and emergency response community, media, and safety interest groups.346 The USFA collaborates with public and private groups to promote and improve fire prevention and life safety through research, testing, and evaluation. The USFA manages many of the federal programs related to firefighting, including the National Fire Incident Reporting System, a dataset and collection of statistical

343 See: https://www.ruraltraining.org/about/overview/ (accessed on October 21, 2015). 344 The U.S. Congress passed P.L. 93-498, the Federal Fire Prevention and Control Act, in 1974, which led to establishment of the USFA and the NFA. See: http://legcounsel.house.gov/Comps/FIREPREV.PDF (accessed on December 28, 2015). 345 See: https://www.fas.org/sgp/crs/homesec/RS20071.pdf (accessed on December 28, 2015). 346 See: http://www.usfa.fema.gov/about/index.html (accessed on December 28, 2015).

West Fertilizer Company Final Report January 2016 154 U.S. CHEMICAL SAFETY AND HAZARD INVESTIGATION BOARD

information relating to fire incidents, public fire education campaign materials, and information on grants and funding. The USFA oversees the NFA at the NETC in Emmitsburg, Maryland. The NFA works to enhance the capability of fire and emergency services and allied professionals to deal more effectively with fire- related emergencies. The NFA offers free training courses and programs on campus, online, and throughout the nation.347 The USFA offers federal funding and grants directly to local career fire departments and VFDs and unaffiliated EMS organizations to help address a variety of equipment, training, and other firefighter and EMS-related needs. The grants are provided through the Fire Act Grants under the FEMA AFG Program, FP&S Grants, and SAFER Grants, which provide grants for hiring, recruiting, and retaining firefighters.348 349 Firefighters often dedicate personal time for training, public education, fundraising, and other nonemergency department-related activities. In addition, they are often members of their local or national firefighter associations. 7.8.2 Texas Firefighting Training Organizations and Programs CSB reviewed the availability of national firefighter training grants and programs. The review revealed that career and volunteer firefighters and fire departments have access to many federally funded training grants and programs throughout the nation. Moreover, CSB reviewed state-level funding and programs available to Texas firefighters and fire departments in an effort to determine how access to HAZMAT and FGAN-specific training can be increased while also improving training standards for FGAN. Select state resources—such as the Texas Commission on Fire Protection (TCFP), Texas Rural Volunteer Fire Department Assistance Program, SFFMA, and Texas A&M Engineering & Extension Services (TEEX) are discussed further. As a result, CSB issues recommendations to some of these state resources, which are identified in Section 11. 7.7.2.2 Texas Commission on Fire Protection (TCFP) The TCFP, a state government agency, is one of many state and local agencies that compose the Texas fire protection community. The commission’s statutory authority and role within this community is to serve Texas fire departments as follows: • Provide training guidelines and assistance to the fire service. • Establish and enforce statewide fire service standards.350

347 See: http://www.usfa.fema.gov/training/nfa/ (accessed on December 28, 2015). 348 See: https://www.fema.gov/welcome-assistance-firefighters-grant-program (accessed on December 28, 2015). 349 The AFG, FP&S Grants, and SAFER Grants are discussed in the Assistance to Firefighters Grant Program Section of this report. 350 See: http://www.tcfp.texas.gov/about/compact.asp (accessed on November 13, 2015).

West Fertilizer Company Final Report January 2016 155 U.S. CHEMICAL SAFETY AND HAZARD INVESTIGATION BOARD

An important TCFP characteristic is its service to regulated organizations, including paid fire departments and those volunteer departments that choose to be voluntarily regulated. The policymaking body of the TCFP is a 13-member board appointed by the governor and confirmed by the Texas Senate. The commissioners adopt policies in accordance with Chapter 419 of the Texas Government Code. Upon adoption by the TCFP, these policies become state administrative laws collected under Part 13 of Title 37 of the Texas Administrative Code (TAC). The TCFP may propose or adopt changes to the TAC. The firefighter advisory committee351 is responsible for reviewing and commenting on the administrative rules that govern the state’s fire service and also assists the TCFP in matters relating to fire protection personnel, volunteer firefighters, fire departments, and VFDs.352 The advisory committee may submit new curricula (or changes to curricula) for study and review before approval by the TCFP. The commission often creates ad hoc advisory committees to assist in creating and updating curricula, validating test questions, and addressing other related matters. Members of the Texas fire service serve voluntarily on these committees.353 The goal of the TCFP compliance program is to ensure the safety of the state’s fire protection personnel by inspecting fire departments and other regulated entities to confirm that they are in compliance with state laws and rules. The compliance inspectors also inspect training records to ensure that fire protection personnel are in compliance with the appropriate certification rules for their disciplines. The commission’s compliance officers travel to every regulated entity at least once every 2 years to inspect fire protection personnel certifications, training records, breathing air test records, protective clothing, and self-contained breathing apparatus. If a fire department is found to be in violation of a state law or TCFP rule, the Compliance Section compels the department to correct the violation immediately or works with it to develop a plan that will lead to compliance.354 The TCFP certification program certifies approximately 32,000 fire protection personnel in Texas. State law requires paid fire protection personnel to be certified by this commission; volunteers and individuals not affiliated with a paid or volunteer department can voluntarily choose to be certified by TCFP. The commission certifies fire protection personnel to multiple levels (basic, intermediate, advanced, and master) in several different disciplines.355 In addition, TCFP certifies training facilities. When fire departments have unmet training needs, TCFP may take a number of actions: • Authorize reimbursement for a local government agency for training program expenses. • Provide staff or educational materials on request to training programs or fire departments.

351 The firefighter advisory committee is created by the TCFP enabling statute, Chapter 419 of the Government Code. The TCFP appoints members. See: http://www.statutes.legis.state.tx.us/Docs/GV/htm/GV.419.htm#419.023 (accessed on December 28, 2015). 352 See: http://www.tcfp.texas.gov/directory/commission_and_committees.asp (accessed on November 3, 2015). 353 See: http://www.tcfp.texas.gov/directory/commission_and_committees.asp (accessed on November 13, 2015). 354 See: http://www.tcfp.texas.gov/about/compact.asp (accessed on October 27, 2015). 355 Including structure fire protection, aircraft rescue fire protection, marine fire protection, fire inspector, fire and arson investigation, HAZMAT technician, pumper driver and operator, fire instructor, fire officer, and head of department.

West Fertilizer Company Final Report January 2016 156 U.S. CHEMICAL SAFETY AND HAZARD INVESTIGATION BOARD

• Establish minimum curriculum requirements for courses in schools operated by state or local governments. • Provide training assistance to fire departments through the following methods:  Purchase and provide training aids to fire departments, temporarily or permanently.  Finance training seminars for fire departments.  Pay instructor fees to teach specialized courses for fire departments that employ fully paid fire protection personnel.356 Although these four elements are cited in the TCFP statute (Section 419.028), the commission is no longer funded for the type of assistance provided by authorizing reimbursements or delivering training. The TCFP funding program that offers this type of training assistance to fire departments was transferred to the Texas A&M Forest Service in 2009.357 TCFP’s Certification Curriculum Manual supplies the curriculum for the training of structural fire suppression personnel, aircraft rescue fire protection personnel, and marine fire protection personnel as well as fire inspectors, fire investigators, HAZMAT technicians, pumper drivers and operators, fire instructors, fire officers, and wildland firefighters. 358 The Certification Curriculum Manual’s Hazardous Materials Awareness chapter was updated in June 2015. This chapter of the manual includes course material on Class 5 oxidizing substances and organic peroxides; this class includes AN.359 The curriculum sets the minimum standards for materials covered in the course; however, instructors decide whether to go into further detail within specific topic areas such as AN. The TCFP may consult and cooperate with a local governmental agency, other governmental agency, university, college, junior college, or other relevant institutions concerning the development of training schools and associated programs of courses of instruction for fire protection personnel, including the preparation or implementation of continuing education or training programs.360 The TCFP has entered into a memorandum of understanding (MOU) with TEEX361 to coordinate each organization’s training responsibilities. In addition, the TCFP has an MOU with the Texas A&M Forest Service to coordinate the provision of training assistance and other assistance to firefighting entities. The Texas A&M Forest Service consists of many programs directed to VFDs to enhance the ability of firefighters to protect themselves and the public from fire-related hazards. One such program within the Texas A&M Forest Service that supports volunteer firefighter training is discussed in more detail in the next section.

356 See: http://www.statutes.legis.state.tx.us/Docs/GV/htm/GV.419.htm (accessed on October 28, 2015), Section 419.028 through Section 419.031. 357 The Rural VFD Assistance Program in the Texas A&M Forest Service is discussed further in Section 7.7.4 of this report. 358 See: http://www.tcfp.texas.gov/manuals/curriculum_manual.asp (accessed on October 28, 2015). 359 See: http://www.tcfp.texas.gov/manuals/curriculum_manual/chapter_6.pdf (accessed on October 28, 2015). 360 Section 419.030. 361 Section 7.7.2.5 discusses TEEX in further detail.

West Fertilizer Company Final Report January 2016 157 U.S. CHEMICAL SAFETY AND HAZARD INVESTIGATION BOARD

  1. 7.2.3 Texas Rural Volunteer Fire Department Assistance Program (HB 2604)

In a January 2015 interim report by the Texas Committee on Homeland Security and Public Safety, Chairman Joe Pickett (D-El Paso) submitted recommendations to, and drafted legislation for consideration by, the House of Representatives, 84th Texas Legislature.362 The committee’s report indicates that of the 40 fire departments that represent the authority with jurisdiction for the 43 FGAN facilities across the state, 27 are VFDs; 7 are a combination of paid and volunteer firefighters; and 6 consist only of paid firefighters. A recommendation that stemmed from this finding encouraged the legislature to approve a rider in the Appropriations Bill for Texas A&M Forest Service that addresses funding in the Rural Volunteer Fire Department (Rural VFD) Assistance Program. The purpose of this funding is to provide training for VFDs across the state that are in a jurisdiction with an FGAN facility.363 The 77th Texas Legislature passed House Bill 2604 in 2001, establishing the Rural VFD Assistance Program.364 The primary goal of the VFD Assistance Programs is to enhance the emergency response capabilities of volunteer and combination fire departments with 20 or fewer paid members.365 The Texas Rural VFD Assistance Program provides funding to rural VFDs for the acquisition of firefighting vehicles, fire and rescue equipment, protective clothing, dry hydrants, computer systems, and firefighter training. This cost-share program is funded by the Texas State Legislature. Beginning on September 1, 2015, the annual grant budget for the program increased to $24.3 million from the previous annual budget of $12.8 million. Cost share assistance for training tuition has increased after changes to the Rural VFD Assistance Program that also took effect on September 1, 2015. The new reimbursement rate is 100 percent of the actual cost of tuition, not to exceed $125 per day up to a maximum of $625 per trainee per school. The annual maximum for training tuition grant assistance per fire department is $12,500.366 The Texas A&M Forest Service conducted a funding meeting for FY 2015 on March 11, 2015, to determine how grants would be awarded. During this meeting, approximately $1.4 million in grants was awarded to Texas VFDs. Two VFDs in McLennan County, Texas, were approved for funding, and one is the WVFD, approved for $8,000 for a training library (Table 10).367 All VFDs that apply for state grants,

362 See: http://www.house.state.tx.us/_media/pdf/committees/reports/83interim/House-Committee-on-Homeland- Security-and-Public-Safety-interim-report.pdf (accessed on October 28, 2015). 363 See: http://www.house.state.tx.us/_media/pdf/committees/reports/83interim/House-Committee-on-Homeland- Security-and-Public-Safety-interim-report.pdf (accessed on October 28, 2015): 22–24. 364 See: http://texasforestservice.tamu.edu/uploadedFiles/FRP/New_- _Local_Capacity_Building/TFS_Assistance_Programs/Historical_Funding_Summaries/2604/HB%202604%20Fund ing%20Meeting%20Approvals%2003_11_15.pdf (accessed on November 13, 2015). 365 See: http://texasforestservice.tamu.edu/content/article.aspx?id=19857 (accessed on October 28, 2015). 366 See: http://texasforestservice.tamu.edu/uploadedFiles/TFSMain/Preparing_for_Wildfires/Fire_Department_Programs/Lo cal_Volunteer_Fire_Department_Programs/Rural_VFD_AssistanceProgram/Special%20Announcement%20-- %20Program%20Changes%20FY16(1).pdf (accessed on October 27, 2015) 367 See: http://texasforestservice.tamu.edu/uploadedFiles/FRP/New- _Local_Capacity_Building/TFS_Assistance_Programs/Historical_Funding_Summaries/2604/HB%202604%20Fund ing%20Meeting%20Approvals%2003_11_15.pdf (accessed on November 16, 2015).

West Fertilizer Company Final Report January 2016 158 U.S. CHEMICAL SAFETY AND HAZARD INVESTIGATION BOARD

including matching federal funds, must certify that they have adopted NIMS. Before the WFC incident in December 2012, the WVFD had requested funds through the Rural VFD Assistance Program for a large brush truck, but the request was not approved. The WVFD requested this funding every year thereafter, although it did not meet the NIMS certification requirement.368 Table 10. Funds Allocated to WVFD through the Rural VFD Assistance Program Date Approved Equipment/Training Category Approved Amount January 2003 Truck Chassis Large $40,000 May 2004 C/S Structural Gear $6,000 September 2008 Wildland Gear $5,700 March 2015 Training Library $8,000

The SFFMA of Texas was instrumental in the creation of House Bill 2604, which annually distributes grant funding through the Texas Forest Service to fire departments in need. Similar to the TCFP, the SFFMA assists many volunteer firefighters and fire departments in obtaining training. 7.7.2.4 State Firefighters’ and Fire Marshals’ Association of Texas (SFFMA) Organized in 1876, the SFFMA is Texas’s oldest and largest fire association serving the fire and emergency service responders of Texas. The SFFMA has the support of more than 1,200 fire departments, 22,000 individual members, 80 industrial fire brigades, and EMS and international departments. The association is active in legislative efforts that affect the fire service in Texas.369 The SFFMA is a fee-based membership organization that offers individual and fire department memberships,370 and has partnered with the National Volunteer Fire Council (NVFC)371 to provide joint benefits to their members. The SFFMA consists of a volunteer firefighter certification program that encourages VFDs to initiate the program in an effort to upgrade training standards. A VFD must be a member of the SFFMA to participate in the certification programs. Through the program, the fire department’s selected

368 See: http://tfsweb.tamu.edu/HistoricalFunding/ (accessed on November 17, 2015). 369 See: http://www.sffma.org/web/SFFMA/About_Us/SFFMA/About.aspx?hkey=84e079d0-75c2-47df-b9e9- 7ae03d5685dd (accessed on October 29, 2015). 370 The fire department membership dues are based on the Federal Census population of the cities and towns that they serve. 371 NVFC is discussed in further detail in Section 7.7.3 of this report.

West Fertilizer Company Final Report January 2016 159 U.S. CHEMICAL SAFETY AND HAZARD INVESTIGATION BOARD

certification coordinator is required to attend a free certification workshop at least once every 2 years. The certification workshop is a requirement to maintain the departments’ participation status. The certification coordinator validates that all training and certifications meet state criteria; it is the coordinator’s responsibility to document the training and ensure that a qualified instructor has conducted the training. To verify that a department holds continual training and correctly maintains its records, the coordinator must submit an annual training summary or progress report.372 The SFFMA Certification Board sets the criteria for the training curriculum; however, it does not develop topic- specific training modules for firefighters and departments. The SFFMA relies on firefighter training schools, approved training providers, or certified training instructors to administer the training. The SFFMA Program allows individual departments and their members to decide how far they will go in the process. The process levels include NFPA 1403, Introductory; NFPA 1001, Firefighter I; NFPA 1001, Firefighter II; and Master certifications.373 Currently, the SFFMA does not have an exclusive program that certifies firefighters on HAZMAT or AN; however, part of the certification for the Firefighter I program includes a section on HAZMAT.374 As part of the minimum standards for firefighter certification, the section designates that trainees recognize the hazard classes and divisions of HAZMAT and WMD375 and identify common examples of materials and primary hazards in each hazard class or division, such as Class 5 oxidizers.376 The SFFMA Texas Industrial Emergency Services Board (TIESB) provides guidance for the Texas Industrial Fire Protection Program. The TIESB works with the Texas Chemical Council and the National Petroleum Refiners Association in reviewing differences among various industries in training needs for all emergencies and loss prevention programs. The TIESB has many objectives, including promoting the development of fire training and loss prevention programs for industrial firefighters or members of the SFFMA and also recommending for each member industry-minimum criteria for maintaining effective fire training, loss prevention, and educational programs.377 Currently, the TIESB has a certification program for industrial HAZMAT teams and emergency response personnel378 that establishes minimum criteria for certification but also provides flexibility so that each facility can structure its training programs to address individual needs. The TIESB has formally adopted NIMS, designating it as the incident management system for all members seeking certification of their training programs.379

372 See: http://www.sffma.org/web/SFFMAPages/Certification/2015/Navigating_Cert_2015_Apr.pdf (accessed on November 2, 2015). 373 See: http://www.sffma.org/WEB/SFFMAPages/Certification/Resources/Certification_FAQ.pdf?WebsiteKey=65a2a6d5- cf92-4d26-8251-b69cdeecaa68&hkey=1509bff9-ad5b-411d-904d-9de79e384a6d (accessed on October 30, 2015). 374 Of the 22 sections in the program, Section 18 covers HAZMAT. 375 NFPA 472, Section 4.2.1: 2, 3. 376 See: http://www.sffma.org/web/SFFMAPages/Certification/2015/Full_Program_2015_02.pdf (accessed on October 29, 2015): 61. 377 See: http://www.sffma.org/web/SFFMA/Divisions/Industrial/SFFMA/TIESB.aspx?hkey=60a9d6ce-7f4f-4d91- b642-d41585bf3597 (accessed on October 30, 2015). 378 Training program certification is for HAZMAT Technician, Specialist, and Incident Command levels. 379 See: http://www.sffma.org/web/SFFMAPages/TIESB/Policy_Docs/TIESB010.pdf (accessed on October 30, 2015).

West Fertilizer Company Final Report January 2016 160 U.S. CHEMICAL SAFETY AND HAZARD INVESTIGATION BOARD

Within Texas, multiple organizations support firefighter standards for training curricula and certification. These organizations work with training partners such as TEEX in the development of course curricula and the implementation of training programs that suit the diverse needs of fire departments. 7.7.2.5 Texas A&M Engineering Extension Services (TEEX) In 1929, the State Firemen’s and Fire Marshals' Association of Texas (SFFMA) selected Texas A&M College as the site for a permanent firefighter training school. In 1931, the Texas Legislature authorized the creation of a Firemen’s training school by passing House Bill No. 921. This bill authorized Texas A&M to create, conduct and maintain a Firemen’s training school. A member of The Texas A&M University System, the Texas A&M Engineering Extension Service (TEEX) has more than 80 years of experience in providing professional services with expertise in national and industrial security, emergency preparedness and response, public infrastructure, occupational safety, economic development, and technology assessment and validation. TEEX employees nearly 1,000 experts in various fields and is able to develop training solutions for emergency responders across the state and nationwide. Funding for Texas agencies and fire departments is available from several sources to support TEEX tuition, fees, and other related expenses. TEEX encourages fire departments to take advantage of federal funding programs such as those in DHS FEMA as well as no-cost training in Texas through the fire extension services, NFA, area schools, and other assistance programs and associations.380 TEEX tailors need-specific services and training at a number of its facilities and also at customer-specified locations worldwide. TEEX has the ability to offer a full-range of services and delivery methods, including: • Course design and development. • Online course delivery. • Hosting services for eLearning courses. • Classroom-based instruction. • Hands-on skills-based instruction. • National certification testing. • Technical assistance and technology validation. • Bilingual training and translation services. TEEX collaborates with resources within The Texas A&M University System to provide a unique blend of research and technical expertise. The TEEX Emergency Services Training Institute’s (ESTI) main training facility is the Brayton Firemen’s Training Field. Adjacent to this facility is Disaster City®, which is comprised of 296 acres in College Station, Texas, making it the world’s largest, most comprehensive campus for first responders. Each year thousands of students participate in ESTI’s hands-on training in firefighting, emergency medical services, hazardous materials, rescue, Incident Command, and

380 See: https://teex.org/Pages/about-us/funding-grants.aspx (accessed on November 6, 2015).

West Fertilizer Company Final Report January 2016 161 U.S. CHEMICAL SAFETY AND HAZARD INVESTIGATION BOARD

specialized programs. ESTI offers over 200 different courses in more than 130 specialty areas to students from across Texas, the United States and around the world.381 In FY15 TEEX/ESTI provided training for some 96,364 students in 3,670 separate classes which accounted for 1.625 million man contact hours. During the course of FY15 training, all 254 Texas Counties were served including 92% of all Texas Communities. TEEX/ESTI also trained students from 81 foreign countries during FY15. TEEX receives General Revenue from the State of Texas to provide outreach or extension training to the States Emergency Responders. In FY15, more than 20,000 responders of the State trained through this program at no cost to them or their department. Through its accreditation with the National Professional Qualification System (NPQS), or ProBoard, TEEX/ESTI is authorized to offer certification training in compliance with National Fire Protection Association (NFPA) standards.382ESTI is currently accredited to provide certifications in 46 individual disciplines. TEEX/ESTI currently leads the nation in the number of ProBoard certifications issued on an annual basis. The certification levels TEEX/ESTI offers include: • NFPA 1001 Fire fighter I & II. • NFPA 1002 Driver/Operator Pumper, Aerial, ARFF, Mobile Water Supply. • NFPA 1003 Airport Firefighter. • NFPA 1006 Rescue Technician - Rope Rescue I, II; Trench Rescue I, II; Confined Space Rescue I, II; Wilderness Rescue I, II; Vehicle & Machinery I, II; Structural Collapse I, II. • NFPA 1021 Fire Office I – IV. • NFPA 1031 Fire Inspector I & II, Plans Examiner I. • NFPA 1041 Fire Instructor I & II. • NFPA 1061 Public Safety Telecommunicator I & II. • NFPA 1081 Fire Brigade - Incipient, Advanced Exterior, Interior Structural, Leader. • NFPA 472 Hazardous Materials - Awareness; Operations Core; Operations Mission Specific: PPE, Product Control, Air Monitoring & Sampling, Response to Illicit Laboratory Incidents; Technician; Technician w/ Tank Car Specialty; Technician w/ Cargo Tank Specialty; Technician w/ Intermodal Tank Specialty; Technician with Flammable Liquids Bulk Storage Specialty; Incident Commander. ESTI supports FEMA’s HSNTP with the delivery of over twenty different courses across the nation with topics that range from tactical level, Wide Area Search and WMD Defensive Operations to simulation- driven incident management courses to executive-level workshops and seminars. In addition, ESTI provides technical assistance, exercise planning expertise and event review and After-Action Report support to organizations across the nation. Throughout the year, TEEX hosts full-scale operational readiness exercises (OREs) that test a team’s entire response capabilities.

381 See: https://teex.org/Pages/about-us/disaster-city.aspx (accessed on December 31, 2015). 382 See: https://teex.org/Pages/Program.aspx?catID=613&courseTitle=Pro%20Board (NPQS) (accessed on December 31, 2015).

West Fertilizer Company Final Report January 2016 162 U.S. CHEMICAL SAFETY AND HAZARD INVESTIGATION BOARD

TEEX/ESTI provides many DHS FEMA funded training programs that can be delivered online, face to face, or in a combination format. One such training program funded by DHS FEMA involves HAZMAT response; this training is geared toward emergency responders and focuses on the special challenges of dealing with WMDs or a terrorist incident, including knowledge of CBRNE events and responses to incidents involving CBRNE materials. The Standardized Awareness Training course focuses on training responders to meet competency requirements established in NFPA 472, Chapter 4, and in OSHA 29 CFR 1910.120. The course takes an all-hazards approach to HAZMAT incidents and gives participants the knowledge needed to recognize the hazardous material, protect themselves, notify others, and secure the scene. Another training program funded by DHS FEMA addresses incident management and response. These courses facilitate the implementation of the all-hazards multidisciplinary team-based approach outlined in the DHS National Response Framework, which is designed to respond to large-scale or expanding incidents, including those involving HAZMAT.383 In addition to the in-person training, ESTI offers a variety of web-based training, such as awareness-level courses and those within the innovative Online Recruit Academy. These interactive courses provide emergency responders with a convenient way to complete knowledge-based training at their own pace. There is an increasing need to provide training to responders who have the potential and will be expected to respond to Industrial Facilities/Industrial Emergencies in their area. There are multitudes of newly- introduced specialized hazards across the United States that First Responder communities have the potential to respond to. The increased potential for incidents to occur in these areas further highlights the need for all response and emergency management personnel be trained on how to properly preplan for, respond to, and mitigate these specialized incidents. Components of this training should address the preplanning, command, safety, operational, logistical, and local resource coordination and public information areas and should focus on assisting local responders in addressing key priorities and a safe outcome for their personnel. These hazards include emergencies that result from drilling and fracking operations, flammable liquid bulk storage facilities, transportation emergencies (pipelines, rail384, trucking, maritime, and air), and warehousing or storage of hazardous chemicals and materials such as FGAN. In light of these potential exposures to the response community, TEEX has developed a course entitled, “Industrial Emergencies for Municipal Based Responders” (IEMBR). This is a two-phased course with the awareness-level information contained in Phase I and the hands-on (firefighting and Hazardous Materials Response) contained in Phase II. TEEX is currently reaching out across the State of Texas and providing Phase I IEMBR training to first responders. Due to the complexity of the Phase II response scenarios and the

383 See: https://teex.org/Pages/Program.aspx?catID=469&courseTitle=Response- Hazardous%20Materials%20and%20Search%20and%20Rescue (accessed on November 6, 2015). 384 TEEX has also developed and is currently delivering a 24-hour Crude by Rail course. TEEX worked in corporation with rail service providers, owning companies and the response community to develop this course. It provides a detailed look at rail car construction, hazards associated with rail car emergencies, response plans, resource management and responder safety.

West Fertilizer Company Final Report January 2016 163 U.S. CHEMICAL SAFETY AND HAZARD INVESTIGATION BOARD

need for realistic training props, all Phase II training is conducted at the TEEX/ESTI Brayton Firemen’s Training Field. Phase II of the IEMBR course is more costly than Phase I due to the flammable liquid fuels, LPG and firefighting foams that are used as part of the training.385 There is a critical need to establish a funding mechanism for First Responders to attend IEMBR Phase II training. 7.7.3 National Membership Firefighter Associations Although several bodies represent the interests of firefighters and emergency responders, the three most prominent labor unions and associations for firefighters in the United States are the International Association of Fire Fighters (IAFF), NVFC, and IAFC. Combined, these three associations have more than a million members across the United States.386 An important aspect of the mission of each association entails providing training information and resources to members. 7.7.3.1 International Association of Fire Fighters (IAFF) The IAFF387 is a labor union that represents career firefighters in the United States and Canada. Established in 1918, the IAFF currently represents a membership of more than 300,000 professional firefighters in more than 3,200 fire departments. The IAFF acts to ensure that adequate resources and tools, including the development and implementation of new training and equipment, are provided to career firefighters and paramedics in all member fire departments. 7.7.3.2 National Volunteer Fire Council (NVFC) The NVFC is a nonprofit association that represents the interests of fire and emergency services at the national level by providing advocacy, information, resources, and programs to support volunteer first responders. The NVFC serves as the voice of the volunteer firefighter in the national arena and supplies tools, resources, programs, and advocacy for first responders nationwide. The NVFC also conducts national advocacy for first responders, including promoting legislation that benefits the fire and emergency medical services. The NVFC offers information, education, and training for volunteer fire and EMS organizations throughout their respective states.388 7.7.3.3 International Association of Fire Chiefs (IAFC) The IAFC represents the leadership of firefighters and emergency responders worldwide.389 With a network of more than 10,000 fire chiefs and emergency personnel, IAFC members include experts in firefighting, EMS, terrorism responses, HAZMAT spills, natural disasters, search and rescue operations, and public safety policy. The IAFC was established in 1873 to provide a forum for fire and emergency

385 See: https://teex.org/Documents/2014-04-firetalk.pdf (accessed December 31, 2015). 386 See: http://www.nfpa.org/research/reports-and-statistics/the-fire-service (accessed on December 28, 2015). 387 See: http://client.prod.iaff.org/#page=AboutUs (accessed on December 28, 2015). 388 NVFC. See: http://www.nvfc.org/ (accessed on December 28, 2015). 389 IAFC. See: http://www.iafc.org/About/?navItemNumber=537 (accessed on December 28, 2015).

West Fertilizer Company Final Report January 2016 164 U.S. CHEMICAL SAFETY AND HAZARD INVESTIGATION BOARD

service leaders to exchange ideas, develop professionally, and identify the latest products and services available to first responders, including career and VFD chiefs.390 8.0 Regulatory Analysis Multiple federal, state, and local agencies regulate FGAN storage and handling, depending on statutory requirements, which can address worker safety, environmental protection, public safety, national security, and transportation. Requirements for reporting bulk quantities of FGAN also vary. CSB reviewed FGAN safety-related requirements in the United States and found differences in how FGAN facilities are identified and regulated. This section includes a discussion of the requirements for FGAN safety and security as well as voluntary efforts by industry, including: • President Obama’s Executive Order (EO) 13650 (Section 8.1). • OSHA Explosives and Blasting Agents standard (Section 8.2). • DHS Chemical Facility Anti-Terrorism Standards (CFATS) (Section 8.3). • OSHA Process Safety Management (PSM) standard (Section 8.4.1). • EPA Risk Management Program rule (Section 8.4.2). • EPA Emergency Planning and Community Right-to-Know Act (EPCRA) regulations (Section 8.5). • National fire protection standards and Texas fire codes (Section 8.6). • Post incident state and local regulatory developments (Section 8.7). • Voluntary industry initiatives (Section 8.8). Each of these sections includes background and analysis. The sections provide supporting information for the CSB recommendations in Section 11, which includes recommendations to regulatory agencies to revise existing standards so that they include FGAN-specific requirements. 8.1 President Obama’s Executive Order 13650 In the aftermath of the West Fertilizer Company (WFC) incident, President Barack Obama issued EO 13650, “Improving Chemical Facility Safety and Security,” on August 1, 2013.391 The EO states that “…measures can be taken by executive departments and agencies with the regulatory authority to further improve chemical facility safety and security in coordination with owners and operators.”392 The EO established the Chemical Facility Safety and Security Working Group, which is co-chaired by the

390 According to its website, the mission of the IAFC is to provide leadership to current and future career, volunteer, fire rescue, and EMS chiefs; chief fire officers; and company officers and managers of emergency service organizations throughout the international community, using vision, information, education, services, and representation to enhance their professionalism and capabilities. See: http://www.iafc.org/About/index.cfm?navItemNumber=537 (accessed on December 28, 2015). 391 Executive Order 13650. “Improving Chemical Facility Safety and Security.” August 1, 2013. 392 Ibid.

West Fertilizer Company Final Report January 2016 165 U.S. CHEMICAL SAFETY AND HAZARD INVESTIGATION BOARD

Secretary of Homeland Security, the EPA Administrator, and the Secretary of Labor.393 Working with multiple governmental agencies, the EO Working Group was tasked with improving operational coordination with state, local, and tribal partners; enhancing federal coordination regarding chemical facility safety and security; improving information collection and sharing; modernizing key policies, regulations, and standards; and identifying best practices.394 One of the group’s first deliverables, issued in August 2013, was the document, “Chemical Advisory: Safe Storage, Handling, and Management of FGAN.”395 The advisory summarized best practices for AN storage, lessons learned from past AN incidents, hazard information, hazard reduction options, emergency planning activities, emergency response operations, and information resources.396 In June 2015, the advisory was reissued as “Chemical Advisory: Safe Storage, Handling, and Management of Solid Ammonium Nitrate Prills.”397 This advisory includes a more detailed and reorganized regulatory information section.398 It has been distributed by government agencies such as EPA and OSHA and by the two U.S. manufacturers of FGAN, CF Industries and EDC. In addition, in June 2014, the EO Working Group published “Actions to Improve Chemical Facility Safety and Security—A Shared Commitment: Report for the President.”399 That report summarized the EO Working Group’s progress, focusing on actions to date, findings and lessons learned, challenges, and high-priority next steps.400 The report includes an aggressive action plan that details specifically how the EO Working Group has begun to, or will, tackle each of its aforementioned tasks.401 8.2 OSHA Explosives and Blasting Agents Standard The 1971 OSHA Explosives and Blasting Agents standard (29 CFR 1910.109) regulates, in part, the storage, use, and transportation of explosives and blasting agents and specifies safety requirements for various grades of AN. The standard was based on two national consensus standards—NFPA402 495 (Code for the Manufacture, Transportation, Storage, and Use of Explosives and Blasting Agents, 1970

393 Ibid. 394 Ibid. 395 See: http://www.ctif.org/sites/default/files/news/files/fed_an_advisory-083013.pdf (accessed on December 28, 2015). 396 Ibid. 397 See: http://www.epa.gov/sites/production/files/2015-06/documents/an_advisory_6-5-15.pdf (accessed on December 28, 2015). 398 Ibid. 399 See: https://www.osha.gov/chemicalexecutiveorder/final_chemical_eo_status_report.pdf (accessed on December 28, 2015). 400 Ibid. 401 See: https://www.osha.gov/chemicalexecutiveorder/ (accessed on December 28, 2015). 402 NFPA codes, standards, and guides are voluntary consensus products that are not enforceable unless adopted into law.

West Fertilizer Company Final Report January 2016 166 U.S. CHEMICAL SAFETY AND HAZARD INVESTIGATION BOARD

Edition), and NFPA 490 (Code for the Storage of Ammonium Nitrate, 1970 Edition).403 The first nine sections of OSHA’s Explosives and Blasting Agents standard, (a) through (h), cover the storage and transportation of explosives and blasting agents. The last two sections, (j) and (k), address small arms ammunition and the manufacture of explosives and pyrotechnics. AN is covered in the middle of the standard, under section (g) when it is used as a blasting agent404 and under section (i) when it is stored in the form of crystals, flakes, grains, or prills, including fertilizer grade, dynamite grade, nitrous oxide grade, technical grade, and other mixtures containing 60 percent or more AN by weight.405 Included in 29 CFR 1910.109(i) are requirements for storage, building construction, ventilation, and fire protection associated with bulk and bagged AN. These requirements cover facilities that store more than 1,000 pounds of AN.406 At the time of the incident, the WFC facility stored FGAN well in excess of 1,000 pounds. The standard includes various requirements for the bulk storage of AN.407 For example, the standard mandates that warehouses have “adequate ventilation or be capable of adequate ventilation in case of fire.”408 Also, storage bins must “be clean and free of materials which may contaminate AN.”409 Bins storing bulk quantities of AN may not be constructed with galvanized iron, copper, lead, or zinc “unless suitably protected,” and wooden bins “protected against impregnation by AN” are permitted.410 The partitions dividing AN storage from other products that would contaminate the AN must be of “tight construction.”411 To avoid potentially dangerous contamination, AN must be in a separate building or must be separated by “approved type firewalls of not less than 1 hour fire-resistance rating from storage of organic chemicals, acids, or other corrosive materials, materials that may require blasting during processing or handling, compressed flammable gases, flammable and combustible materials or other contaminating substances.”412 While CSB found no evidence to suggest that any detonation of AN in the United States has occurred at a facility compliant with OSHA’s 1910.109(i) standard, CSB does find that these requirements do not offer sufficient safeguards concerning the bulk storage of FGAN. This conclusion is evidenced best by the

403 See: https://www.osha.gov/pls/oshaweb/owadisp.show_document?p_table=FEDERAL_REGISTER&p_id=19509 (accessed on December 28, 2015). The NFPA 490 standard went through several updates. The most recent edition was issued in 2002. In 2010, NFPA incorporated NFPA 490 into a more recently developed standard, NFPA 400 (Hazardous Materials Code) (discussed in detail in Section 8.6.1). OSHA, however, has not updated its Explosives and Blasting Agents standard to incorporate the provisions of NFPA 400 because OSHA’s legal authority to adopt consensus standards expired in the mid-1970s. 404 Because it was not pertinent to this investigation, 29 CFR 1910.109(g) is not discussed. 405 29 CFR 1910.109(i)(1)(i)(a). 406 29 CFR 1910.109(i)(2)(i). 407 Because bulk storage of FGAN was primarily at issue at the WFC facility, bagged storage is discussed only briefly for the sake of comparison. 408 29 CFR 1910.109(i)(4)(i)(a). 409 29 CFR 1910.109(i)(4)(ii)(a). 410 Ibid. 411 Ibid. 412 29 CFR 1910.109(i)(5)(i)(a).

West Fertilizer Company Final Report January 2016 167 U.S. CHEMICAL SAFETY AND HAZARD INVESTIGATION BOARD

WFC incident, in which the use of wooden bins (albeit not untreated wooden bins) to store FGAN was allowed under the 1910.109(i) standard. The CSB found that such construction likely facilitated the fire’s spread between storage bins.413 Moreover, the CSB found that even if the wooden bins had been treated (e.g., with coated or clad materials), the incident may have still occurred. This is because, as discussed previously, although coated or clad materials may protect wood against AN impregnation, they are not fire resistant and will still burn. Accordingly, CSB issued public comments on March 31, 2014 when OSHA released a Request for Information (RFI) to CSB and other stakeholders on its Explosives and Blasting Agents standard.414 The comments made by CSB pertained in part to the weakness of the provisions in 29 CFR 1910.109(i), particularly with respect to the bulk storage of FGAN.415 Specifically, CSB expressed concern that, because of certain gaps in 1910.109(i), users are left to decide appropriate safety measures without proper instruction.416 For example, 1910.109(i) permits the use of wooden bins “protected against impregnation of AN” without defining the word “impregnation.”417 Furthermore, even if the word had been defined, CSB noted that the use of wooden bins is not recommended in other countries, such as the United Kingdom (U.K.), which recommend the use of concrete for bulk AN storage.418 Moreover, CSB noted in its RFI comments that 1910.109(i) does not provide sufficient fire protection measures with respect to the storage of bulk quantities of FGAN because it requires sprinklers only for bagged AN in amounts exceeding 2,500 tons.419 CSB concluded that the requirement for sprinklers (or other fire suppression methods) as well as fire detection equipment likely would have helped minimize the severity of the impact of the WFC fire and explosion on the facility and on the surrounding community.420 In addition, CSB commented that the title of the standard, “Explosives and Blasting Agents,” should be revised so that it is clear that FGAN not used as a blasting agent or explosive is also covered under the standard.421 As currently titled, the name of the standard might mislead readers to believe that the standard applies only to the explosives industry. Accordingly, CSB recommended that the title be revised to clearly indicate that the standard also applies to the fertilizer industry. Similarly, CSB noted that no scope describing the purpose and application of the standard is listed at the beginning of the standard.422 Rather, the scope of 29 CFR 1910.109(i) that applies to FGAN appears in the middle of the standard.

413 It should be noted, however, that 29 CFR 1910.109(i) did prohibit the configuration and contents of the seed room adjacent to the AN bin. 414 On December 9, 2013, OSHA issued an RFI on 17 issues regarding revision to the agency’s regulatory standards. CSB commented on 15 of the 17 issues in a public comment dated March 31, 2014. The CSB comments are posted on the OSHA website; see: http://www.csb.gov/assets/1/16/CSB_RFIcomments.pdf (accessed on December 28, 2015). 415 See: http://www.csb.gov/assets/1/16/CSB_RFIcomments.pdf (accessed on December 28, 2015). 416 Ibid. 417 Ibid. 418 Ibid. 419 Ibid. See: 29 CFR 1910.109(i)(7)(i). 420 See: http://www.csb.gov/assets/1/16/CSB_RFIcomments.pdf (accessed on December 28, 2015). 421 Ibid. 422 Ibid.

West Fertilizer Company Final Report January 2016 168 U.S. CHEMICAL SAFETY AND HAZARD INVESTIGATION BOARD

CSB recommended changing this organization so that the scope is specified early in the document and is easy to locate. CSB concluded that the implementation of such recommendations regarding the standard’s title and scope would likely make the standard easier to understand. In addition to providing comments in response to the OSHA RFI, CSB reviewed guidance documents on FGAN from government and industry sources, finding that the only pre-WFC incident reference to the OSHA standard was in an EPA Chemical Safety Alert, “Explosion Hazard from AN,” from December 1997.423 In a letter to EPA, The Fertilizer Institute (TFI), a major trade association composed of fertilizer industry representatives, contended that the reference was inaccurate and that EPA therefore should remove it from its alert.424 Specifically, TFI said that the standard “was not applicable to facilities handling AN, unless the facility also handles an explosive or blasting agent.”425 This assertion, however, is incorrect; no part of the standard supports such a reading. As previously mentioned, 29 CFR 1910.109(i) clearly states that it applies to “. . . the storage of AN in the form of . . . prills including fertilizer grade . . .”426 Nonetheless, CSB finds that additional and well publicized guidance is needed to explain the applicability and provisions of the standard. Fertilizer industry representatives reported to the Government Accountability Office (GAO) that it was not well known that 1910.109(i) applies to FGAN.427 While conducting interviews with WFC management and employees, CSB found that WFC personnel knew little about the pertinent section. During these interviews, CSB learned that OSHA conducted its last inspection of the WFC plant428 in 1985, when the facility was cited for various violations concerning anhydrous ammonia, respiratory protection, and recordkeeping. CSB found no evidence that OSHA cited the WFC for violating any requirement of 1910.109(i) before the April 2013 fire and explosion. It is unknown whether OSHA inspected the facility against this section of the standard. CSB found that, in addition to WFC personnel, others who would reasonably be expected to know about 29 CFR 1910.109(i) might not have had such knowledge. After the current owners acquired the facility in 2004, third-party safety consultants who visited the facility never referenced 1910.109(i) in their final inspection reports. In fact, in reviewing documentation provided by the WFC, CSB identified only one mention of 1910.109(i)—in a Safety Data Sheet (SDS) provided by one of the WFC’s FGAN suppliers, CF Industries, which the WFC received in 2012. The GAO confirmed this observation, noting in its May

423 See: http://nepis.epa.gov/Exe/ZyPDF.cgi/P100BH59.PDF?Dockey=P100BH59.PDF (accessed on December 28, 2015). 424 The Fertilizer Institute. “Fertilizer Grade Ammonium Nitrate: Properties and Recommended Methods for Packaging, Handling, Transportation, Storage and Use.” 425 Leason, Chris S., counsel to TFI. Letter to Tawai-David Chung, EPA OSWER, CEPPO, June 27, 1997. At the request of CSB, EPA conducted a search to find its final signed response to TFI’s letter. Because of the age of the document, it would only exist in paper form; however, EPA no longer has paper files from that time frame. Thus, EPA’s response to this letter is unknown. 426 29 CFR 1910.109(i)(1)(i)(a). 427 GAO. “Chemical Safety: Actions Needed to Improve Federal Oversight of Facilities with Ammonium Nitrate.” Washington, DC: GAO, May 2014. 428 Certain structures of the WFC plant had not yet been built at the time of the 1985 OSHA inspection.

West Fertilizer Company Final Report January 2016 169 U.S. CHEMICAL SAFETY AND HAZARD INVESTIGATION BOARD

2014 report that it reviewed four SDSs from producers of solid FGAN fertilizer and only one mentioned the pertinent section of the OSHA standard.429 CSB notes as a concern the fact that the fertilizer industry, as recently as 2014, reported that personnel exhibited little recognition of the applicability of 1910.109(i) to FGAN.430 With respect to enforcement, CSB found very little history of OSHA using 29 CFR 1910.109(i) to cite fertilizer facilities. Table 11 shows OSHA’s record of 1910.109(i) citations and also the citation that OSHA issued against the WFC by Standard Industrial Classification (SIC)431 code. Table 11. OSHA 29 CFR 1910.109(i) Citation History No. Facility Inspection Year Standard Industrial Classification 1. Coshocton Farm Bureau (Coshocton, OH) 1974 5083: Farm and Garden Machinery 2. Smith-Douglass Chemical Div. Bo. (Clayton, DE) 1975 5191: Farm Supplies 3. Jr. Simplot Co. (Bartley, NE) 1975 2875: Fertilizers, Mixing Only 4. Farmers Union Cooperative Oil (Flandreau, SD) 1975 5541: Gasoline Service Stations 5. Old Fox Chemical Co, Inc. (East Providence, RI) 1976 2875: Fertilizers, Mixing Only 6. Drake Chemical Inc. (Lock Haven, PA) 1976 2865: Cyclic Crudes and Intermediates 7. IMC Chemical Group Inc. Trojan (New Tripoli, PA) 1976 2892: Explosives 8. Atlas Powder Co. Kinepak (Alvarado, TX) 1977 2892: Explosives 9. Jacklin-Plant Food Center (Post Falls, ID) 1977 5191: Farm Supplies

  1. Genstar Chemical Inc.

(Presque Isle, ME) 1978 2873: Nitrogenous Fertilizers

  1. Nipak Energy Corp.

(Krum, TX) 1979 2892: Explosives

  1. Iuka Coop Exchange

(Iuka, KS) 1979 5153: Grain and Field Beans

  1. Beaver Explosives Inc.

(New Castle, PA) 1980 2892: Explosives

  1. Independent Explosives Co. of

Pennsylvania (Pittston Township, PA) 1987 2892: Explosives

429 GAO. “Chemical Safety: Actions Needed to Improve Federal Oversight of Facilities with Ammonium Nitrate.” Washington, DC: GAO, May 2014. 430 Ibid. 431 SIC is a system for classifying industries according to industry-specific four-digit codes.

West Fertilizer Company Final Report January 2016 170 U.S. CHEMICAL SAFETY AND HAZARD INVESTIGATION BOARD

(Parrish, AL) 1990 2892: Explosives

(Kittanning, PA) 1994 2892: Explosives

(Orlando, FL) 1997 2875: Fertilizers, Mixing Only

(Good Springs-Tremont, PA) 1998 1629: Heavy Construction, Nec.

(Mount Carmel, PA) 1999 2892: Explosives

(West, TX) 2013 5191: Farm Supplies As shown in Table 11, 19 inspections resulted in citations, excluding the citation against the WFC. The SIC code for 10 of these citations are clearly nonfarm, addressing mostly explosives; the nine remaining citations are related to farm supplies. It is important to note, however, that these data reflect citations only, not inspections. That is, although the facilities in Table 11 were inspected against, and cited for violations of, 1910.109(i), they do not represent all inspections conducted by OSHA against that section of the standard. It is impossible to determine whether OSHA inspected any other facilities for compliance, but did not cite them. CSB found no evidence of citations from 1999 to 2013. The OSHA 29 CFR 1910.109(i) citation history in Table 11 is also similar to that of more recent OSHA enforcement data from 2005 to 2013. These data show that no other facility with the same North American Industry Classification System (NAICS)432 code as the WFC (NAICS Code 424910) received a citation for violating 1910.109(i). The GAO May 2014 report similarly concluded that OSHA rarely issued citations for violations of the standard’s requirements for FGAN storage at fertilizer facilities.433 GAO found that “a citation for a violation of [OSHA’s] AN storage regulations was issued as a result of an inspection of a fertilizer facility only once before the explosion in West, Texas.”434 After the WFC explosion, OSHA issued 24 citations to the WFC on October 9, 2013, including nine citations for serious violations of 29 CFR 1910.109(i).435 These violations included lack of adequate ventilation, absence of fire-resistive construction, and improper storage and bin pile heights.436 The agency also cited the WFC for not ensuring that the wooden bins it used to store FGAN were treated to prevent FGAN impregnation.437 OSHA and the WFC ultimately settled, with the WFC agreeing to pay

432 NAICS is the standard used by Federal statistical agencies in classifying business establishments for the purpose of collecting, analyzing, and publishing statistical data related to the U.S. business economy. 433 GAO. “Chemical Safety: Actions Needed to Improve Federal Oversight of Facilities with Ammonium Nitrate.” Washington, DC: GAO, May 2014. 434 Ibid. 435 OSHA. “Citation and Notification of Penalty to Adair Grain,” October 9, 2013. 436 Ibid. 437 Ibid.

West Fertilizer Company Final Report January 2016 171 U.S. CHEMICAL SAFETY AND HAZARD INVESTIGATION BOARD

penalties without admitting guilt about violating the standards under which it was cited, including 1910.109(i). There is evidence that the WFC owners made efforts to comply with regulations when notified of noncompliance. When the WFC owners acquired the facility in 2004, state and federal regulators found them to be noncompliant with environmental, product quality, and transportation regulations—issues that the owners promptly corrected. For example, Federal EPA inspectors cited the WFC for not refiling its Risk Management Plan (RMP) registration in 2004.438 This citation prompted the WFC to hire an insurance company to develop a comprehensive RMP for the safe storage of its anhydrous ammonia.439 Also, Texas Commission on Environmental Quality (TCEQ) inspectors issued a citation to the facility in 2006 for not having an air permit for anhydrous ammonia.440 The WFC subsequently developed maintenance and inspection programs to prevent anhydrous ammonia releases. As a result of these inspections and citations, the WFC took appropriate corrective actions. The importance of regulatory awareness and notification, therefore, cannot be overemphasized. 8.2.1 OSHA Issuance of Guidance on Explosives and Blasting Agents Standard In December 2014, the OSHA Directorate of Enforcement Programs issued investigatory and citation guidance to OSHA enforcement personnel on elements of 29 CFR 1910.109. The nine-page guidance document provides additional clarification of the scope of 1910.109(i) and its application to facilities that store FGAN. This document includes specific compliance guidance for the majority of standard provisions and describes conditions that would be considered in or out of compliance. This guidance further clarifies the application of the standard to facilities storing FGAN and provides a list of NAICS industry codes for facilities most likely to manufacture, use, store, handle, or possess FGAN. The list of NAICS codes includes facilities such as the WFC plant and states that particular attention to AN hazards is needed when inspecting these facilities. The guidance also clarifies the standard’s definition of “adequate ventilation” and includes the types of ventilation likely to be unacceptable under the regulations as well as a ventilation rate calculation to assess compliance. Furthermore, the guidance document provides additional clarification on the subject of wood protection against FGAN impregnation. As discussed previously, 1910.109(i) does not specifically define compliant approaches for the treatment of wood to protect against FGAN impregnation. The standard prohibits untreated wood bin construction for FGAN storage. Although OSHA does not recommend the use of treated wood bins, wood with impermeable coating and claddings (such as two-part epoxy coatings, steel sheet cladding, or sodium silicate) are considered acceptable means for protecting wood against FGAN impregnation. OSHA provides additional guidance for varying types of wood construction that might be encountered during field inspections, including citable conditions such as improperly treated wood and

438 EPA. “Enforcement Case Report to West Chemical & Fertilizer Company,” August 14, 2006. 439 Triangle Insurance Company. Anhydrous Ammonia Supplement for WFC, 2006. 440 TCEQ. “TCEQ Enforcement Referral to West Chemical & Fertilizer,” June 21, 2006.

West Fertilizer Company Final Report January 2016 172 U.S. CHEMICAL SAFETY AND HAZARD INVESTIGATION BOARD

treated wood that has not been maintained to protect the coating integrity. The guidance also addresses pile heights for clumping and caking conditions and fire prevention. The 2014 guidance document for 1910.109(i) addressed some of the issues with vague wording that CSB raised in the RFI comments. Some of the requirements listed under the standard, however, do not provide sufficient safeguards to a facility owner storing bulk quantities of FGAN. In the case of the WFC incident, the wood-constructed bins were made of combustible materials and likely facilitated the spread of a fire between storage bins. According to OSHA, AN impregnation of porous combustible materials, such as wood, can accelerate combustion in the event of a structural fire and increase the explosion risk.441 OSHA permits the use of wood bins and wood construction only if the wood is protected against impregnation. Although coated or clad materials can protect against AN impregnation, they are not fire resistant and will still burn, contributing to the generation of heat during a fire. CSB determined that the wood-constructed bins likely contaminated the AN, ultimately leading to the detonation by increasing AN energy and sensitivity (discussed in Section 4.2.1). Completely eliminating wood and other combustibles as materials for constructing FGAN bins and storage facilities greatly reduces the possibility of contaminating FGAN during a fire or smoldering event. Although OSHA enforcement guidance and other efforts have provided greater clarity on how 1910.109(i) applies to FGAN facilities, OSHA still needs to revise and update the standard to incorporate the most recent provisions in NFPA 400 (2016 Edition) that address the safe storage of FGAN. OSHA cannot enforce some of the regulations in the current 1910.109(i) because they contain requirements reserved for the authority having jurisdiction, such as the municipal or state code official for occupancy permits. Moreover, OSHA cannot cite the following requirements in the standard: • 29 CFR 1910.109(i)(2)(ii): Approval of large quantity storage shall be subject to due consideration of the fire and explosion hazards, including exposure to toxic vapors from burning or decomposing ammonium nitrate. • 29 CFR 1910.109(i)(2)(iii)(e): The continued use of an existing storage building or structure not in strict conformity with this paragraph may be approved in cases where such continued use will not constitute a hazard to life. Because the current version of 1910.109(i) has limited enforcement in some areas—and because NFPA 400 (2016 Edition) (discussed in Section 8.6.1.1) includes updated provisions, some in response to the WFC incident, for increasing the safety of AN storage facilities—OSHA should update 1910.109(i) to include requirements similar to the provisions in NFPA 400 (2016 Edition). It also should revise the rules that currently are enforceable only by municipal or state officials.

441 OSHA enforcement directive on 1910.109(i).

West Fertilizer Company Final Report January 2016 173 U.S. CHEMICAL SAFETY AND HAZARD INVESTIGATION BOARD

  1. 2.2 Need for an Emphasis Program

Unfortunately, only after the WFC incident was more attention focused on the hazards of FGAN and the role of applicable regulations. Since the explosion and issuance of the EO, OSHA has worked to increase awareness of FGAN and the scope of 29 CFR 1910.109(i) through the joint agency advisory on safe storage of FGAN, the letter to the fertilizer industry, and the guidance document for compliance officers to assist in enforcing the 1910.109 standard for FGAN facilities. However, enforcement guidance does not provide the resources needed by OSHA to increase the frequency of inspections, although such guidance may help ensure that 1910.109(i) is applied appropriately when OSHA compliance officers happen to inspect facilities that fall under the rule. A more realistic and immediate approach to confirm that FGAN facilities are complying with the standard would be for OSHA to launch a regional emphasis program (e.g., in Regions IV, VI, and VII442) where these types of facilities are more common. A regional emphasis program would include a certain number of annual inspections per year, which would facilitate bringing FGAN facility operators into compliance with both regulatory and industry standards and would reduce the potential for a future event similar to the WFC incident. Imposing stricter requirements on AN storage and handling could take several years before enactment into federal regulations. OSHA has initiated several national, regional, and local emphasis programs targeted at specific industries or located in specific geographical areas to help prevent hazards. Such emphasis programs have successfully focused inspection and enforcement efforts on specific industries. A 1910.109(i) emphasis program can include NFPA 400 (2016 Edition) as a guidance document for compliance officers to support recognition of hazardous conditions or issuance of violations when found. It would also prompt improvement of safe FGAN storage and handling practices through increased awareness and would allow OSHA to collect information and data that could support future revisions to current regulations on FGAN. 8.3 Chemical Facility Anti-Terrorism Standards (CFATS) DHS promulgated the CFATS in 2007 to address security issues at high-risk chemical facilities, including those that store certain quantities of FGAN. The rule establishes risk-based performance standards for chemical facility security and requires facilities to prepare vulnerability assessments and security plans to protect the public from a breach of security or an intentional release. Under CFATS, DHS collects information from facilities that possess designated quantities of chemicals of interest (COIs).443 In creating the COI list, DHS referenced other established lists that regulate

442 These regions include the following states: Alabama, Florida, Georgia, North Carolina, South Carolina, Tennessee, Mississippi, Kentucky, Nebraska, Kansas, Missouri, Iowa, Texas, Oklahoma, Arkansas, Louisiana, and New Mexico. 443 CFATS § 27.210(a)(1)(i).

West Fertilizer Company Final Report January 2016 174 U.S. CHEMICAL SAFETY AND HAZARD INVESTIGATION BOARD

chemicals—including the list of chemicals covered under the EPA Risk Management Program, the Chemical Weapons Convention, and DOT—and a list of chemicals with known inhalation hazards. The COI list includes 322 chemicals and also screening threshold quantities for each chemical as it relates to each of the three defined security hazards (release, theft, and sabotage). Chemical facilities that meet the COI criteria listed in Appendix A of the CFATS rule must complete and electronically submit a Chemical Security Assessment Tool (CSAT) Top-Screen form to DHS. Using the information collected from facility Top-Screen information, DHS assigns a preliminary risk-based tier— from the highest (tier 1) to the lowest “high-risk” level (tier 4) and the “not high-risk” level (tiered out)— based on a basic assessment of the potential consequences in association with the chemical holdings at each facility.444 Once a preliminary tier is assigned, each facility in tiers 1 through 4 must submit a CSAT Security Vulnerability Assessment to DHS, and DHS uses that assessment to make a final determination of the facility’s assessed level of risk. If DHS retains the facility in one of the four high-risk tiers, the facility must submit a site security plan. DHS reviews the plan, conducts an onsite inspection of the facility, and approves the plan if it is deemed adequate relative to the risks inherent in the facility, its chemical holdings, and potential consequences of a security breach. Since publication of the CFATS rule, DHS has received more than 50,000 Top-Screen forms submitted by chemical facilities. As of September 2015, DHS covers 3,182 high-risk facilities nationwide, and 2,607 of those sites have undergone onsite authorization inspections. 8.3.1 AN Screening Thresholds FGAN is listed in CFATS Appendix A as a DHS COI. A facility reports to DHS based on possession of AN under three conditions:

  1. If a facility possesses 5,000 pounds or more of FGAN with more than 0.2 percent combustible

substances, including any organic substance calculated as carbon, to the exclusion of any other added substance in bulk storage, the facility must report. Facilities meeting this threshold must also submit information to DHS on quantity and on method of storage or packaging.

  1. If a facility possesses 400 pounds or more of FGAN with more than 0.2 percent combustible

substances, including any organic substance calculated as carbon, to the exclusion of any other added substance in transportation packaging, the facility must report.

  1. If a facility possesses 2,000 pounds or more of solid FGAN with a nitrogen concentration of 23

percent or higher in transportation packaging, the facility must report.

CSB requested and reviewed CFATS data from all facilities in the United States that submitted information to DHS for storage of FGAN as of March 2014. According to the DHS data, 1,351 facilities in the United States store AN in quantities that exceed the screening thresholds. The majority of those

444 When determining whether a facility is high risk, DHS primarily focuses on the potential consequences associated with a successful terrorist attack on the facility (including the use of stolen or diverted materials in a separate attack offsite). A threat factor also is incorporated into the risk assessment for facilities with release hazards.

West Fertilizer Company Final Report January 2016 175 U.S. CHEMICAL SAFETY AND HAZARD INVESTIGATION BOARD

facilities store FGAN for agricultural uses (Figure 73). Based on the NAICS codes submitted with Top- Screen information, 46 percent of the facilities that report to DHS stock FGAN for agricultural purposes such as farm merchandising and wholesale or crop preparation. An additional 6 percent store FGAN for fertilizer mixing.

Figure 73. Percentage of AN Storage Facilities by Industry (Source: DHS) In 2008, DHS filed a reporting extension to agricultural facilities meeting screening thresholds of FGAN for farmers and agricultural end users of FGAN, such as the preparation and application of crops, feed, land, or livestock.445 However, this extension does not apply to chemical distribution facilities or to commercial chemical application services, such as the WFC. At the time of the April 2013 explosion, the WFC possessed an estimated maximum of 120,000 pounds of FGAN, about 60 times the screening threshold of 2,000 pounds, but did not submit Top-Screen information to DHS as required under the CFATS. Consequently, DHS was unaware that the WFC possessed FGAN until the 2013 explosion. After the incident, the WFC retroactively submitted a Top Screen to DHS upon notification that it was not compliant with the rule, and DHS did not issue a citation to the WFC for originally failing to submit the form. If the WFC had complied with the CFATS, a CFATS inspection or assistance visit might have noted the storage conditions at the WFC facility and prompted change. In addition, DHS engagement

445 73 Federal Register 1640.

West Fertilizer Company Final Report January 2016 176 U.S. CHEMICAL SAFETY AND HAZARD INVESTIGATION BOARD

with facility management might have prompted greater engagement by local law enforcement, which in turn might have supported greater involvement by other community emergency services. 8.4 Safety Management Programs Following a number of major chemical accidents in the United States and abroad in the 1970s and 1980s, Congress amended the Clean Air Act (CAA) in 1990 to require both OSHA and EPA to publish new regulations to help prevent similar accidents. Through Section 304 of the CAA Amendments, Congress directed the Secretary of Labor, in coordination with the EPA Administrator, to promulgate, pursuant to the Occupational Safety and Health Act of 1970, a chemical process safety standard to prevent accidental releases of chemicals that could pose a threat to employees.446 Also, through CAA Amendments Section 112(r), Congress required EPA to publish regulations and guidance for chemical accident prevention at facilities using substances that posed the greatest risk of harm from accidental releases.447 The following sections focus on the intertwined regulations that OSHA and EPA developed – the OSHA Process Safety Management of Highly Hazardous Chemicals standard and the EPA Risk Management Program rule. 8.4.1 OSHA Process Safety Management Standard OSHA’s Process Safety Management of Highly Hazardous Chemicals standard (29 CFR 1910.119) (known as the PSM standard) became effective in May 1992.448 The standard contains requirements for preventing or minimizing the consequences of catastrophic releases of toxic, reactive, flammable, or explosive chemicals.449 It includes the following 14 elements: 1. Employee participation. 2. Process safety information. 3. Process hazard analysis. 4. Operating procedures. 5. Training. 6. Contractors. 7. Pre-startup safety review. 8. Mechanical integrity. 9. Hot work permits. 10. Management of change. 11. Incident investigation. 12. Emergency planning and response. 13. Compliance audits.

446 See: https://www.osha.gov/Publications/osha3132.html (accessed December 28, 2013). 447 See: http://www.epa.gov/sites/production/files/2013-10/documents/caa112_rmp_factsheet.pdf (accessed December 28, 2015). 448 OSHA. “Process Safety Management.” OSHA 3132, 2000. 449 29 CFR 1910.119.

West Fertilizer Company Final Report January 2016 177 U.S. CHEMICAL SAFETY AND HAZARD INVESTIGATION BOARD

Trade secrets.450 The PSM standard states that it applies, in part, to “a process which involves a chemical at or above the specified threshold quantities listed in Appendix A [List of Highly Hazardous Chemicals, Toxics and Reactives] to this section.”451 Notably, FGAN is not on this list. In deciding which chemicals to regulate under the PSM standard, OSHA reviewed potential “highly reactive and explosive substances,” as required by Section 304(b) of the CAA Amendments.452 OSHA considered information drawn from multiple sources, including EPA, DOT, World Bank, NFPA, the Health and Safety Commission of the U.K., and the states of Delaware and New Jersey.453 With respect to reactives, OSHA chose to include only those chemicals with the two highest (i.e., most dangerous) reactivity ratings under NFPA 490 because of the significant risk that they posed to workers.454 These chemicals had reactivity ratings of 3 or 4.455 FGAN, however, was left off the PSM list, despite having a reactivity rating of 3.456 Although the agency did consider adding FGAN to the PSM list in the late 1990s, this effort failed due to “resource constraints and other priorities.”457 Thus, FGAN has yet to be regulated under the PSM standard. Anhydrous ammonia, on the other hand, is on the List of Highly Hazardous Chemicals, Toxics and Reactives, with a threshold quantity of 10,000 pounds. CSB found that, at the time of the incident, the WFC was storing the equivalent of 34,000 pounds of anhydrous ammonia, more than three times the threshold quantity that triggers PSM coverage. CSB also discovered that the WFC had previously stored 54,000 pounds of anhydrous ammonia in 2006 and 2011. Given these facts, the WFC should have complied with the PSM standard because the company stored anhydrous ammonia, at least in 2006, 2011, and 2013, in quantities that exceeded its threshold quantity. However, CSB learned that the PSM standard did not apply to the WFC at the time of the incident because the facility qualified under OSHA’s interpretation of the standard’s retail facilities exemption. At the time of the incident, a facility qualified under the retail facilities exemption if the following conditions were met: (1) the facility contained a highly hazardous chemical in a quantity that met or exceeded the threshold quantity for the chemical; (2) the facility used a process458 covered by the PSM

450 Ibid. 451 29 CFR 1910.119(a)(1)(i). 452 CONSAD OSHA Report, 1988. 453 55 Federal Register 29150. 454 CONSAD OSHA Report, 1988. 455 Ibid. 456 Federal OSHA in discussion with CSB, May 14, 2015. 457 See: https://www.osha.gov/pls/oshaweb/owadisp.show_document?p_table=FEDERAL_REGISTER&p_id=16946 (accessed December 28, 2015). 458 The PSM standard defines “process” as any activity involving a highly hazardous chemical, including any use, storage, manufacturing, handling, or onsite movement of such chemicals (or any combination of these activities). It also states that, for purposes of this definition, any group of vessels that are interconnected—and separate vessels

West Fertilizer Company Final Report January 2016 178 U.S. CHEMICAL SAFETY AND HAZARD INVESTIGATION BOARD

standard; and (3) more than 50 percent of the facility’s income was derived from direct end users.459 The WFC facility met all three conditions for its storage of anhydrous ammonia. It stored anhydrous ammonia, a highly hazardous chemical, in quantities that exceeded its threshold quantity. Also, the facility used a process because it stored the anhydrous ammonia, and storage meets the PSM standard definition of a “process.” Because the WFC primarily sold its products, including anhydrous ammonia, to farmers (i.e., direct end users), the company met the third condition as well. Thus, the WFC qualified under the PSM standard’s retail facilities exemption and was not required to comply with the standard. If the PSM standard had applied to the WFC for its storage of anhydrous ammonia however, the WFC would have been required to conduct a process hazard analysis (PHA). A PHA must address the following: • Hazards of the process. • Identification of any previous incident that had a potential for catastrophic consequences in the workplace. • Engineering and administrative controls applicable to the hazards and their interrelationships, such as appropriate application of detection methodologies to provide early warning of releases, with acceptable detection methods that might include process monitoring and control instrumentation with alarms and also detection hardware such as hydrocarbon sensors. • Consequences of a failure of engineering and administrative controls. • Facility siting. • Human factors. • Qualitative evaluation of a range of the possible safety and health effects on employees in the workplace if a failure of controls occurs.460 The WFC would have had to address facility siting as part of its PHA. Facility siting refers to the location of the covered process and its proximity to various other components within the facility’s property.461 It does not refer to the site of the facility in relation to the surrounding community.462 A facility siting analysis at the WFC likely would have identified the close proximity of the facility’s FGAN storage warehouse and its anhydrous ammonia storage tanks, thus triggering implementation of necessary safeguards to mitigate the possibility of potentially catastrophic successive incidents involving the two hazardous chemicals. This observation was a critical element of CSB’s investigation because evidence indicated that the FGAN explosion damaged the facility’s anhydrous ammonia tanks. If more force had been applied to the tanks, their contents could have been released into the neighboring community and

that are located so that a highly hazardous chemical could be involved in a potential release— must be considered a single process. 459 OSHA interpretation letter. See: https://www.osha.gov/pls/oshaweb/owadisp.show_document?p_table=INTERPRETATIONS&p_id=23885 (accessed December 28, 2015). 460 See: https://www.osha.gov/Publications/osha3132.html (accessed on December 28, 2015). 461 See: https://www.osha.gov/pls/oshaweb/owadisp.show_document?p_table=DIRECTIVES&p_id=1558 (accessed on December 28, 2015). 462 Ibid.

West Fertilizer Company Final Report January 2016 179 U.S. CHEMICAL SAFETY AND HAZARD INVESTIGATION BOARD

caused even more fatalities and injuries. However, the WFC was not required to conduct facility siting because it qualified for the PSM standard’s retail facilities exemption. CSB communicated its concern about the retail facilities exemption in its March 31, 2014, comments to OSHA’s December 9, 2013 RFI.463 CSB asked OSHA to consider whether the retail facilities exemption should be revised in order to cover facilities such as WFC, which stored bulk quantities of chemicals covered by the PSM standard.464 8.4.1.1 Revised Interpretation of the PSM Retail Facilities Exemption On July 22, 2015, OSHA issued a memorandum, “Process Safety Management of Highly Hazardous Chemicals and Application of the Retail Exemption” (Retail Exemption Memorandum).465 OSHA noted in the memorandum that the PSM exemption for retail facilities does not define the term “retail facility.”466 However, the agency also said that the preamble to the PSM standard does explain that chemicals in retail facilities are generally sold in “small volume packages, containers, and allotments.”467 OSHA pointed out that the preamble gives an example of a gasoline station as a type of facility that would fit within the definition of a retail facility and thus qualify for the exemption.468 OSHA also mentioned in the Retail Exemption Memorandum that other federal agencies define the term similarly.469 In particular, it states that the U.S. Department of Commerce, which develops NAICS codes, characterizes retail trade as follows (emphasis added): The Retail Trade sector comprises establishments engaged in retailing merchandise, generally without transformation, and rendering services incidental to the sale of merchandise. The retailing process is the final step in the distribution of merchandise; retailers are, therefore, organized to sell merchandise in small quantities to the general public. 470 However, this is not how OSHA had always interpreted its PSM retail exemption. After promulgation of the PSM standard, OSHA issued a series of letters of interpretation471 and a PSM compliance directive472 that interpreted the retail exemption more broadly than originally intended.473 Under these interpretations, a facility was considered exempt from the PSM standard if it derived “more

463 See: http://www.csb.gov/assets/1/16/CSB_RFIcomments.pdf (accessed on December 28, 2015). 464 Ibid. 465 OSHA. “Process Safety Management of Highly Hazardous Chemicals and Application of the Retail Exemption (29 CFR 1910.119(a)(2)(i)).” OSHA Memorandum, July 22, 2015. 466 Ibid. 467 57 Federal Register 6356, 6369. 468 Ibid. 469 OSHA. “Process Safety Management of Highly Hazardous Chemicals and Application of the Retail Exemption (29 CFR 1910.119(a)(2)(i)).” OSHA Memorandum, July 22, 2015. 470 U.S. Department of Commerce. NAICS Manual, Sector 44–45: Retail Trade. 471 OSHA letters of interpretation explain OSHA requirements, which are set by statute, standards, and regulations. 472 OSHA. Compliance Directive (CPL) 02-03-045. 473 OSHA. “Process Safety Management of Highly Hazardous Chemicals and Application of the Retail Exemption (29 CFR 1910.119(a)(2)(i)).” OSHA Memorandum, July 22, 2015.

West Fertilizer Company Final Report January 2016 180 U.S. CHEMICAL SAFETY AND HAZARD INVESTIGATION BOARD

than 50 percent of its income from direct sales of highly hazardous chemicals to the end user” (the 50 percent test).474 This rationale is how the WFC claimed the retail exemption for its storage of anhydrous ammonia. If FGAN had been covered under the PSM standard before the WFC incident, the retail exemption, as it had been interpreted, would have precluded PSM coverage at the WFC and similar facilities. In addition, this 50 percent test allowed employers that sold or distributed large bulk quantities of highly hazardous chemicals directly to end users to claim the exemption, even if the end users were themselves commercial establishments.475 This reasoning led to confusion about the definition of the term “end user.” In its Retail Exemption Memorandum, OSHA said that it did not intend either of these outcomes. OSHA’s Retail Exemption Memorandum rescinded all previous documents, letters of interpretation, and memoranda related to the retail exemption and the 50 percent test.476 OSHA states that its interpretation of the exemption is now more consistent with the standard’s original intent.477 In reference to the NAICS Manual, OSHA states that: Only facilities, or the portions of facilities, engaged in retail trade as defined by the current and any future updates to sectors 44 and 45 of the NAICS Manual may be afforded the retail exemption at 29 CFR 1910.119(a)(2)(i).478 Facilities that fall within Sectors 44–45: Retail Trade, consist of a number of subsectors. These facilities are now (or are still) considered retail facilities eligible for the retail exemption. Notably, NAICS codes typically used for FGAN bulk storage and sales do not fit into one of these classifications. As such, facilities that store or sell bulk FGAN do not qualify for the retail exemption. If OSHA’s new interpretation were in effect before the incident, the WFC could not have claimed the retail exemption for its storage of anhydrous ammonia. Furthermore, it could not have claimed the exemption for its storage of FGAN had FGAN been included on the PSM list pre-incident. If this new interpretation had been in effect before the incident, the WFC might have recognized that its storage of anhydrous ammonia was covered by the PSM standard. Although compliance efforts would have focused on this potential hazard, the WFC might have learned about FGAN-related hazards as well. As previously discussed, if the WFC had conducted a facility siting analysis, it could have identified the close proximity of its FGAN storage warehouse to its anhydrous ammonia pressure tanks. This may have

474 Ibid. 475 Ibid. 476 Ibid. 477 Ibid. According to a December 23, 2015, OSHA memorandum, through September 30, 2016, OSHA will not cite employers for violations of the PSM standard at facilities that it would not have cited applying the interpretation of the term “retail” that was in place prior to July 22, 2015. 478 OSHA. “Process Safety Management of Highly Hazardous Chemicals and Application of the Retail Exemption (29 CFR 1910.119(a)(2)(i)).” OSHA Memorandum, July 22, 2015. Facilities that fall under Sectors 44–45: Retail Trade consist of a number of subsectors, including Motor Vehicle and Parts Dealers (NAICS 441), Building Material and Garden Equipment and Supplies Dealers (NAICS 444), Gasoline Stations (NAICS 447), and General Merchandise Store (NAICS 452).

West Fertilizer Company Final Report January 2016 181 U.S. CHEMICAL SAFETY AND HAZARD INVESTIGATION BOARD

led the WFC to explore the potential for FGAN to catch fire and detonate under certain conditions. It also may have caused the WFC to implement safeguards to prevent hazards associated with the two different chemicals. OSHA’s revised interpretation of the retail exemption would mean that facilities such as the WFC would be covered for their use of anhydrous ammonia. According to the fertilizer industry, more than 3,800 U.S. retail facilities previously exempted by the older interpretation of the retail exemption would be covered under the requirements of the PSM standard because of anhydrous ammonia storage. 479 WFC use of FGAN could also be regulated directly in the future, but only if FGAN were added to PSM’s List of Highly Hazardous Chemicals, Toxics and Reactives. CSB recommends that OSHA consider including FGAN for coverage under the PSM standard.480 CSB supports OSHA’s revised interpretation of the retail exemption to guarantee that potential changes to the PSM standard will apply to facilities like the WFC that store anhydrous ammonia as well as FGAN, which would provide the basis for the CSB’s proposed recommendation to add FGAN to the PSM list. 8.4.1.2 Guidance on Recognized and Generally Accepted Good Engineering Practices Under the PSM Standard OSHA also recently addressed its reference to the common industry term, “recognized and generally accepted good engineering practices” (RAGAGEP), under its PSM standard. This term is often used in performance-based standards like PSM. Generally, standards can be either prescriptive or performance based. As its name suggests, a prescriptive standard sets rigid compliance specifications. A performance- based standard, on the other hand, simply delineates the expected performance outcome or end result, without specifying how the outcome or result is to be achieved. In other words, a prescriptive standard describes how something is to be achieved, but a performance-based standard only specifies what is to be accomplished. For example, OSHA’s Explosives and Blasting Agents standard (Section 8.2) is a prescriptive standard that contains FGAN-specific provisions. That part of the standard is prescriptive because its provisions set out how to handle FGAN; the provisions are inflexible. In contrast, OSHA’s PSM standard is performance-based. It employs a broad approach to materials and applications and enables incorporation of current industry practices. As a performance-based standard, it allows employers to select the RAGAGEP that they choose to apply to their facilities.481 These chosen RAGAGEP are the ones that employers must follow at their facilities so that they are deemed compliant. Although the PSM standard does not define RAGAGEP, OSHA’s Petroleum Refinery PSM National

479 TFI/ARA Hearing Statement: “Examining the Use of Agency Regulatory Guidance.” See: http://www.mo- ag.com/uploaded/Senate%20HSGAC%20RFAM%20Hearing%209-23-15.pdf (accessed December 1, 2015). 480 OSHA has initiated a Small Business Regulatory Enforcement Fairness Act panel on its PSM standard, after issuing an RFI in November 2013 seeking public comment on ways to improve the standard. ATF/OSHA/EPA. “Actions to Improve Chemical Facility Safety and Security.” ATF/OSHA/EPA Fact Sheet, June 2015. 481 OSHA. “RAGAGEP in Process Safety Management Enforcement.” OSHA Memorandum, June 8, 2015.

West Fertilizer Company Final Report January 2016 182 U.S. CHEMICAL SAFETY AND HAZARD INVESTIGATION BOARD

Emphasis Program references the definition established in the Center for Chemical Process Safety’s Guidelines for Mechanical Integrity Systems: Recognized and Generally Accepted Good Engineering Practices (RAGAGEP) are engineering, operation, or maintenance activities based on established codes, standards, published technical reports or recommended practices or a similar document. RAGAGEP detail generally approved ways to perform specific engineering, inspection or mechanical integrity activities, such as fabricating a vessel, inspecting a storage tank, or servicing a relief valve.482 This is the definition OSHA references in addressing its use of the term under the PSM standard. Following the WFC incident, OSHA provided guidance on its use of the term RAGAGEP under its PSM standard in a June 8, 2015, memorandum, “RAGAGEP in Process Safety Management Enforcement” (PSM RAGAGEP Memorandum). As noted by OSHA in its PSM RAGAGEP Memorandum, the PSM standard directly references or implies the use of RAGAGEP in three provisions:

  1. 29 CFR 1910.119(d)(3)(ii): Employers must document that all equipment in PSM-covered

processes complies with RAGAGEP.

  1. 29 CFR 1910.119(j)(4)(ii): Inspections and tests are performed on process equipment subject to

the standard’s mechanical integrity requirements in accordance with RAGAGEP.

  1. 29 CFR 1910.119(j)(4)(iii): Inspection and test frequency follows manufacturer’s

recommendations and good engineering practice, and more frequently if indicated by operating experience.483 Accordingly, RAGAGEP under the PSM standard apply to process equipment design, installation, operation, and maintenance; inspection and test practices; and inspection and test frequencies.484 The PSM RAGAGEP Memorandum notes the following primary sources of RAGAGEP: (1) published and widely adopted codes, (2) published consensus documents, and (3) published nonconsensus documents.485 Published and widely adopted codes are those consensus standards that have been widely adopted by federal, state, or municipal jurisdictions.486 Published consensus documents are identified as those published by certain organizations which must follow the American National Standards Institute (ANSI) “Essential Requirements: Due process requirements for American National Standards” (ANSI Essential Requirements).487 Published nonconsensus documents include publications that do not conform to the ANSI Essential Requirements and peer-reviewed technical articles.488 It is important to note that

482 OSHA. Compliance Directive (CPL) 03-00-010. 483 OSHA. “RAGAGEP in Process Safety Management Enforcement.” OSHA Memorandum, June 8, 2015. 484 Ibid. 485 Ibid. 486 Ibid. Examples of published and widely adopted codes include NFPA 101 (Life Safety Code) and NFPA 70 (National Electric Code). 487 Ibid. Examples of published consensus documents include the ASME B31.3, “Process Piping Code,” and the International Institute of Ammonia Refrigeration (IIAR) ANSI/IIAR 2-2008, “Equipment, Design, and Installation of Closed-Circuit Ammonia Mechanical Refrigerating Systems.” 488 Ibid. Examples of published nonconsensus documents include the Chlorine Institute “pamphlets” focusing on chlorine and sodium hypochlorite safety and the Design Institute for Emergency Relief Systems guideline book addressing technology for reactive and multiphase relief systems design.

West Fertilizer Company Final Report January 2016 183 U.S. CHEMICAL SAFETY AND HAZARD INVESTIGATION BOARD

while OSHA generally accepts published and widely adopted codes and published consensus documents as RAGAGEP, published nonconsensus documents are not necessarily generally accepted. However, OSHA may choose to accept them if they are applicable and appropriate.489 The PSM RAGAGEP Memorandum also explains the difference between “shall” and “should” language. In particular, OSHA notes that positive and negative uses of “shall,” “must,” or similar language in published RAGAGEP reflect the developer’s view that the practice is a mandatory minimum to control a hazard.490 Thus, if an employer deviates from such RAGAGEP, OSHA will presume a violation.491 Where “should” language applies in RAGAGEP, OSHA presumes that employer compliance with the recommended approach is acceptable.492 If an employer chooses to deviate from the recommended approach, however, OSHA will evaluate whether the employer has determined and documented that its alternative approach is at least as protective as the recommended approach or whether the recommended approach does not apply to the employer’s operation.493 OSHA presumes a violation if employers act in a way that RAGAGEP deem they “should not.”494 These enforcement considerations emphasize that RAGAGEP are more than optional recommendations. Many RAGAGEP are mandatory standards based on scientific data and previous incidents and it is crucial that employers comply with them. If FGAN is added to the PSM list, the use of RAGAGEP will allow facilities to select and comply with FGAN-specific standards, such as NFPA 400, that have been recently updated to address and help prevent the conditions that led to the WFC explosion. 8.4.2 EPA Risk Management Program Rule The EPA Risk Management Program rule (40 CFR Part 68, Subparts A through H) is intended to prevent and minimize the consequences of accidental releases of toxic or flammable substances.495 Enacted in 1996, the regulation required facilities to be compliant by 1999.496 In general, covered facilities are those with a substance on one of the Risk Management Program rule’s two lists, one for toxic substances and one for flammable substances, in a quantity that meets or exceeds the threshold quantity for the substance.497 These facilities must perform a hazard assessment, consisting of worst case and alternative release scenarios as well as a five-year accident history; implement an accident prevention program (which is required for most facilities); establish an emergency response program; and develop an RMP

489 Ibid. 490 Ibid. 491 Ibid. 492 Ibid. 493 Ibid. 494 Ibid. 495 EPA. “Accidental Release Prevention Requirements: Risk Management Program Under the Clean Air Act.” RFI, July 31, 2014. 496 See: http://nepis.epa.gov/Exe/ZyPDF.cgi/100038BD.PDF?Dockey=100038BD.PDF (accessed on December 28, 2015). 497 See: http://www.epa.gov/rmp/risk-management-plan-rmp-rule-overview (accessed on December 28, 2015).

West Fertilizer Company Final Report January 2016 184 U.S. CHEMICAL SAFETY AND HAZARD INVESTIGATION BOARD

and submit it to EPA.498 Facility management must revise and resubmit its RMP to EPA at least every five years.499 EPA has developed three program levels for process classification to ensure that individual processes are subject to requirements that appropriately match their size and risks they pose.500 Program Level 1 applies to processes with lower risks that would not significantly affect the public in a worst case release scenario and that have had no accidents with specific offsite consequences in the last five years.501 These facilities have limited and/or minimal accident prevention requirements.502 Program Levels 2 and 3 cover higher-risk facilities that must meet more stringent accident prevention requirements.503 A Program Level 3 facility is not eligible for classification under Program Level 1 and is either (1) subject to OSHA’s PSM standard or (2) classified in one of 10 specified NAICS codes.504 Program Level 3 requires implementation of an accident prevention program that is virtually equivalent to the one required under the PSM standard.505 Program Level 2 applies to facilities that are not eligible for classification in Program Level 1 or Program Level 3.506 Program Level 2 requires implementation of a streamlined accident prevention program.507 The WFC was a Program Level 2 facility under the Risk Management Program rule for its storage of anhydrous ammonia, a regulated substance, which the WFC kept in amounts that exceeded the substance’s threshold quantity. Program Level 2 facilities must conduct hazard reviews.508 For this requirement to be satisfied, facilities must conduct a review and identify the following: • Hazards associated with the Program 2 process and regulated substances. • Opportunities for equipment malfunction or human error that could cause a release. • Safeguards that will control the hazards or prevent the malfunction or error. • Steps to detect or monitor releases.509

498 Ibid. 499 Ibid. 500 See: http://www.epa.gov/sites/production/files/2013-10/documents/caa112_rmp_factsheet.pdf (accessed on December 28, 2015). 501 Ibid. 502 Ibid. 503 Ibid. 504 Ibid. These 10 manufacturing NAICS codes are (1) 32211 pulp mills; (2) 32411 petroleum refineries; (3) 32511 petrochemical manufacturing; (4) 325181 alkalis and chlorine manufacturing; (5) 325188 all other basic inorganic chemical manufacturing; (6) 325192 cyclic crude and intermediate manufacturing; (7) all other basic organic chemical manufacturing; (8) plastics material and resin manufacturing; (9) nitrogenous fertilizer manufacturing; and (10) pesticide and other agricultural chemical manufacturing. See: http://www2.epa.gov/sites/production/files/2013- 11/documents/cd-chap-02.pdf (accessed on December 28, 2015). 505 See: http://www.epa.gov/sites/production/files/2013-10/documents/caa112_rmp_factsheet.pdf (accessed on December 28, 2015). 506 Ibid. 507 Ibid. 508 See: http://www.epa.gov/sites/production/files/2013-11/documents/chap-06-final.pdf (accessed on December 28, 2015). 509 Ibid.

West Fertilizer Company Final Report January 2016 185 U.S. CHEMICAL SAFETY AND HAZARD INVESTIGATION BOARD

CSB discovered that the WFC implemented a prevention program that included a hazard review. In its most recent RMP from 2011, the WFC identified major hazards, which included toxic releases, equipment failure, and earthquakes, but did not include fire or explosion.510 The facility also indicated that it did not use mitigation systems, such as sprinklers, for its storage of anhydrous ammonia.511 Clearly, this hazard review did not provide the type of protection needed to address the fire and explosion that occurred on the day of the WFC incident. Because FGAN is not a regulated substance, the WFC was not required to conduct such a hazard review for its storage of FGAN. Accordingly, CSB recommends that FGAN be added to the Risk Management Program list.512 CSB contends that EPA should consider adding FGAN to the list of regulated substances, taking into account the more recent recognition of the unpredictable explosive hazards of FGAN, better awareness of the location of FGAN facilities across the United States, greater knowledge of the quantity of FGAN normally stored at these facilities, and continuance of FGAN-related incidents since the issuance of the final Risk Management Program list. As demonstrated in Appendix B, FGAN-related incidents continue to occur, domestically and abroad. Despite tremendous property damage and economic cost, the most devastating result of these incidents is the immeasurable loss of human life. CSB found that a likely cause of such loss of life is the alarming number of FGAN facilities located in communities—next to schools, hospitals, residences, and businesses (discussed in Section 9). Another cause, as determined by CSB, is the tendency of these facilities to store FGAN in large quantities. Coupling these factors with the more recent recognition that FGAN is susceptible to unstable detonation under certain conditions, CSB recommends that FGAN be listed under the Risk Management Program rule. Moreover, CSB reviewed original listing criteria and found that inclusion of FGAN on the Risk Management Program list is warranted. 8.4.2.1 Risk Management Program Rule Listing Criteria Background Under CAA Section 112(r)(4), the factors to be considered in listing substances for Risk Management Program rule coverage are (1) the severity of acute adverse health effects associated with accidental releases of the substance, (2) the likelihood of accidental releases of the substance, and (3) the potential magnitude of human exposure to accidental releases of the substance.513 When EPA first promulgated its Risk Management Program list of chemicals and threshold quantities in 1994, it reviewed 11 different lists, including three EPA lists.514 The criteria used for development of these lists were reviewed to determine whether the criteria were related to the factors mandated by Congress for list development

510 WFC 2011 RMP submission to EPA. 511 Ibid. 512 EPA has issued a RFI and worked on a Notice of Proposed Rulemaking for its Risk Management Program rule. ATF/OSHA/EPA. “Actions to Improve Chemical Facility Safety and Security.” ATF/OSHA/EPA Fact Sheet, June 2015. 513 58 Federal Register 5102 (January 19, 1993). 514 Ibid.

West Fertilizer Company Final Report January 2016 186 U.S. CHEMICAL SAFETY AND HAZARD INVESTIGATION BOARD

under CAA Section 112(r).515 Acute toxicity was generally considered in developing these lists of chemicals, but some also used flammability and explosivity as criteria for regulating chemicals.516 As part of its review of the first factor to be considered for listing substances under the Risk Management Program rule, EPA reviewed chemicals that could cause severe acute adverse health effects. EPA found that the severity of acute adverse health effects can be related to the inherent hazards (i.e., hazardous material properties that cannot be changed) of the substances of interest, such as the toxicity of a substance resulting in lethal effects.517 EPA noted that acute adverse health effects also could result from other inherent hazards, such as the flammability or high reactivity of the substance.518 Importantly, it stated that the phenomena associated with these hazards could be, for example, radiant heat from a chemical fire or blast waves from an explosion of a chemical.519 In reviewing the second Risk Management Program listing criteria factor, EPA stated that the likelihood of an accidental release of a chemical can be related to typical usage and handling scenarios, such as equipment commonly used in typical facility operations.520 EPA stated that ubiquitous substances, because of greater handling and use, might have a greater potential for an accidental release.521 The agency observed that a history of a large number of accidents in the past, for example, might be an indicator of an existing hazard related to a particular substance and its potential to be involved in accidental releases in the future.522 Notably, EPA stated that chemicals that are found in large volumes at many locations and chemicals that are particularly prevalent (e.g., commodity chemicals, like chlorine and ammonia) might be more likely to be involved in accidental releases than small-volume, less commonly used chemicals.523 With respect to the last factor to be considered for Risk Management Program listing, EPA found the magnitude of human exposure associated with accidental releases to be related to the severity of the health effects (hazards) and the likelihood of a release (the chance that a release will have an effect on the population of environment beyond the facility fenceline).524 The agency noted that this definition was somewhat different from the traditional risk assessment definition of human exposure, which relates magnitude of exposure to the population and sensitive environments that might be affected by a release from a specific site.525 It recognized that factors that might affect the magnitude of human exposure could be site specific or accident specific and could vary widely by location and incident.526 Significantly, EPA

515 Ibid. 516 Ibid. 517 Ibid. 518 Ibid. 519 Ibid. 520 Ibid. 521 Ibid. 522 Ibid. 523 Ibid. 524 Ibid. 525 Ibid. 526 Ibid.

West Fertilizer Company Final Report January 2016 187 U.S. CHEMICAL SAFETY AND HAZARD INVESTIGATION BOARD

also contended that proximity to population centers, for example, might play a role in the magnitude of accidental releases.527 8.4.2.2 Risk Management Program Rule Listing Criteria and Coverage for FGAN CSB reviewed the original listing criteria to determine their application to FGAN and found support for inclusion of FGAN on the Risk Management Program list. First, CSB found a high severity of acute adverse health effects related to accidental releases of FGAN because one of the phenomena associated with the hazards of FGAN as a reactive and as an explosive is blast waves from an FGAN explosion. Acute adverse health effects from blast waves can include not only major injuries (such as fractures and injuries to the head, ears, and eyes), but also death. All of these were reported after the WFC incident. As stated previously, EPA specifically deemed blast waves to be considered in assessing the severity of acute adverse health effects related to accidental releases of the substance. CSB concluded that FGAN meets the second criteria for listing under the Risk Management Program rule because the likelihood of accidental releases of FGAN is high. Before assessing the merits of this listing factor, CSB sought to define such accidental releases and ultimately found that they can be described as emissions of blast waves and thermal energy from FGAN explosions. An accidental release is defined by the CAA Amendments of 1990 as “an unanticipated emission of a regulated substance or other extremely hazardous substance into the ambient air from a stationary source.”528 In general, this definition has been interpreted to apply only to gases and liquids, not to solids such as FGAN.529 However, in its original Risk Management Program rule listing notice, EPA determined the proposed threshold quantity for high explosives530 based on the quantity that could produce potentially lethal blast waves from an explosion at a distance of 100 meters.531 This determination is significant because it supports the conclusion that EPA envisioned blast waves as qualifying as unanticipated emissions when it considered explosives for addition to the Risk Management Program list. CSB also conducted its own research on explosions and emissions. An explosion involves a sudden release of large amounts of energy. This energy release can be dissipated as blast waves, propulsion of

527 Ibid. 528 40 CFR 68.3 529 ARA. “Re: Accidental Release Prevention Requirements: Risk Management Programs under the Clean Air Act, Section 112(r)(7); Request for Information; Docket # EPA-HQ-OEM-2014-0328; FRL-9911-61-OSWER.” October 29, 2014. 530 High explosives represent the category of explosives that might most easily detonate. 59 Federal Register 4487 (January 31, 1994). They are likely to cause severe impacts in detonation scenarios. These explosives were subsequently deleted from coverage in 1998 due to settlement of litigation with the Institute for Manufacturers of Explosives. 63 Federal Register 640 (January 6, 1998). It is important to note, however, that this was not due to any potential misinterpretation of the term “accidental release” (as discussed in the Explosive Substances Section). 531 58 Federal Register 5102 (January 19, 1993).

West Fertilizer Company Final Report January 2016 188 U.S. CHEMICAL SAFETY AND HAZARD INVESTIGATION BOARD

debris, or the emission of thermal and ionizing radiation.532 Furthermore, the term “emissions” is not strictly limited to the release of toxic or flammable liquids and vapors. It can refer to the generation of hot gases and overpressures that result from explosions. This interpretation aligns with EPA’s reasoning that explosives can produce accidental releases, as demonstrated by EPA’s original inclusion of high explosives on the Risk Management Program list and by its associated determination of the appropriate threshold quantity for such explosives. CSB supports EPA’s original reasoning that blast waves are emissions for purposes of listing substances under the Risk Management Program rule. In particular, CSB supports that this reasoning should apply to FGAN. CSB concluded that there is a reasonable likelihood of an accidental release of FGAN because FGAN is a ubiquitous commodity chemical that is stored in large volumes at many locations. CSB found that this was true not only at the WFC facility (where the WFC stored 80,000 to 120,000 pounds of FGAN), but also at domestic fertilizer facilities throughout the South and the Midwest where Alabama, Missouri, Tennessee and Texas make up more than 50 percent of FGAN consumption in the United States.533 FGAN also has been involved in a large number of accidents in the past (described in Appendix B). It has been at the center of major disasters such as the Oppau, Germany, incident in 1921 and the Texas City, Texas, incident in 1947; each caused more than 500 fatalities. EPA considered these exact factors (i.e., ubiquity, commodity, volume, and past accident history) to be indicative of whether an accidental release of a substance is likely. Finally, CSB determined the magnitude of human exposure associated with accidental FGAN releases is significant because FGAN storage is commonly located close to many population centers. This was clearly the case in West, Texas, where a playground, four public school buildings, a nursing home, and an apartment complex all surrounded the WFC facility. It is also the case throughout Texas, where many fertilizer facilities are in communities and downtown neighborhoods (noted in Section 5.4). Because of the WFC investigation and other CSB investigations that identified offsite consequences from chemical releases, land use planning and siting of chemical facilities remain important issues for CSB. As discussed previously, EPA considered the proximity of facilities to population centers as a significant determinant of potential impact. The WFC incident demonstrates the validity of this conclusion. After finding that all three listing criteria were satisfied, CSB concludes that FGAN warrants listing under the Risk Management Program rule.

532 Akhavan, Chemistry of Explosives (3rd Edition). London: Royal Society of Chemistry, 2011. See: http://app.knovel.com/hotlink/toc/id:kpCEE0001C/chemistry-explosives/chemistry-explosives (accessed on November 14, 2015). 533 See: https://www.tfi.org/sites/default/files/documents/ammoniumnitrateinfographic.pdf (accessed November 17, 2015). Akhavan, Chemistry of Explosives (3rd Edition). London: Royal Society of Chemistry, 2011. See: http://app.knovel.com/hotlink/toc/id:kpCEE0001C/chemistry-explosives/chemistry-explosives (accessed on November 14, 2015). 533 See: https://www.tfi.org/sites/default/files/documents/ammoniumnitrateinfographic.pdf (accessed November 17, 2015).

West Fertilizer Company Final Report January 2016 189 U.S. CHEMICAL SAFETY AND HAZARD INVESTIGATION BOARD

  1. 4.2.3 Additional Support for Risk Management Program Rule Coverage for FGAN

Besides considering the three listing criteria factors mandated under the CAA, EPA identified other substances based on similarities with the mandated substances and selection criteria.534 EPA considered options that accounted for the inherent hazards of the substances to be listed and for the potential of these hazards to affect the community if an accidental release occurred.535 In particular, EPA analyzed hazards such as toxicity, flammability, reactivity, explosivity, and radioactivity, stating that all of them can result in acute effects after short-term exposure.536 EPA identified substances associated with each of these hazards, but also considered the potential impact that the identified substances would have on the community if a release took place.537 It evaluated each hazard independently, as well as each hazard’s potential to pose a threat to the community.538 Ultimately, a group of toxic substances, a group of flammable substances, and a group of explosive substances were proposed in the January 19, 1993, rule for addition to the 16 mandated substances in the CAA.539 Because they pertain to FGAN, CSB conducted further research on explosives and on reactive substances. Explosive Substances With respect to the group of explosive substances, EPA proposed to focus on physical hazards because of their ability to impact communities beyond the fenceline in the event of an accidental release.540 EPA viewed commercial high explosives, which have the potential to detonate, as the explosive substances with the greatest potential to affect such communities and therefore proposed commercial high explosives as a category for listing.541 In determining the threshold methodology, EPA indicated that a blast wave overpressure of 3.0 psi from a detonation could have potentially lethal effects in communities beyond the fenceline.542 The agency noted that this overpressure level could cause serious structural damage to buildings, lead to serious wounds from flying glass, and potentially cause eardrum rupture.543 The agency also considered reactive substances that have explosive properties, including oxidizers (e.g., pure AN), for listing.544 In its final decision however, EPA deferred listing these types of substances for lack of an adequate technical basis upon which to evaluate offsite consequences from unstable and reactive substances.545 Nonetheless, EPA concluded in its response that “this decision does not preclude the

534 58 Federal Register 5102 (January 19, 1993). 535 Ibid. 536 Ibid. 537 Ibid. 538 Ibid. 539 Ibid. 540 Ibid. 541 Ibid. 542 Ibid. 543 Ibid. 544 Ibid. 545 EPA. “Proposed List of Substances and Thresholds for Accidental Release Prevention: Summary and Response to Comments,” January 14, 1994: 146.

West Fertilizer Company Final Report January 2016 190 U.S. CHEMICAL SAFETY AND HAZARD INVESTIGATION BOARD

Agency from revisiting this issue in the future, in response to a petition to list, or when the list is reviewed and the listing criteria modified.”546 For several decades, a number of agencies and organizations have regulated materials with explosive potential. ATF regulates the manufacture, processing, use, distribution, and storage of explosive materials; ATF regulations include requirements for licensing, permitting, and recordkeeping and for storage of explosives.547 DOT regulates the transportation of explosives, and other agencies, such as OSHA, Mine Safety and Health Administration (MSHA), Department of Defense (DOD), and International Maritime Organization, regulate certain aspects of the explosive industry.548 In its 1993 Federal Register notice, however, EPA stated that although explosives are regulated by federal, state, and local governments, these regulations do not uniformly address the issue of using appropriate hazard assessment techniques to identify hazards, designing and maintaining a safe facility, and minimizing the consequences of accidental releases when they do occur.549 EPA noted that all of these elements were to be addressed in the Risk Management Program regulations, which it described as “intended to help focus on accident prevention.”550 The agency therefore asserted that these substances should be considered for purposes of list development and accidental release prevention regulations, and for some time, high explosives (classified as Class 1, Division 1.1 on DOT’s Hazardous Materials Table) were included on the final 1994 Risk Management Program list.551 However, DOT Division 1.1 explosives were delisted four years later.552 After promulgation of the Risk Management Program list, the Institute of Makers of Explosives (IME) petitioned against EPA for judicial review, challenging the listing of high explosives.553 IME objections included the contention that existing ATF, DOT, MSHA, and OSHA regulations already adequately controlled DOT Division 1.1 explosives.554 EPA and IME ultimately settled, with EPA agreeing to delist the explosives in exchange for IME’s promise to undertake specific measures to enhance local emergency response.555 CSB found this information important with respect to its investigation because FGAN has explosive properties under certain conditions. Accordingly, CSB conducted research to determine whether FGAN was listed and then delisted along with these DOT Division 1.1 explosives. CSB found that DOT Division 1.1 explosives include one less common form of AN (classified by the United Nations as UN0222) containing more than 0.2 percent carbonaceous material. However, this form of AN is not commercially used or manufactured. Importantly, CSB discovered that FGAN has never

546 Ibid. 547 58 Federal Register 5201 (January 19, 1993). 548 Ibid. 549 Ibid. 550 Ibid. 551 Ibid. 552 79 Federal Register 44607 (July 31, 2014). 553 61 Federal Register 16598 (April 15, 1996). 554 Ibid. 555 Ibid. See also: 63 Federal Register 640 (January 6, 1998).

West Fertilizer Company Final Report January 2016 191 U.S. CHEMICAL SAFETY AND HAZARD INVESTIGATION BOARD

been explicitly regulated under the Risk Management Program rule because it is not a DOT Division 1.1 explosive. Furthermore, even if FGAN were a DOT Division 1.1 explosive, the DOT Division 1.1 explosives were never specifically identified by name on the Risk Management Program list. Therefore, AN has never explicitly been listed under the Risk Management Program rule. Nonetheless, CSB found it significant that EPA evaluated explosives, and the effects they can have upon communities in detonation scenarios, when determining the substances to include on the Risk Management Program list.556 Because FGAN can detonate under certain conditions, CSB recommends that FGAN be included for coverage under the Risk Management Program rule. Further support for including FGAN on the Risk Management Program list can be found in EPA’s original inquiry into reactive substances and in CSB’s past work on reactives. Reactive Substances At the time of its 1993 Federal Register notice, EPA was attempting to evaluate the hazards of reactive and unstable chemicals and to develop an adequate technical basis for determining the potential effects on the community.557 For example, EPA investigated computer models that estimate heats of reaction and also the possible use of heats of reaction to compare the effects of an explosion of an unstable substance to the effects of an explosion of TNT.558 EPA stated that this method would only be appropriate for substances that detonate, an outcome that appeared to be unlikely for many unstable substances.559 Ultimately, EPA contended that unstable and reactive substances would be considered for listing for accidental release prevention if the evaluation indicated potential community consequences.560 On the basis of the WFC investigation and on the CSB’s “Improving Reactive Hazard Management” study, CSB recommends that FGAN be added to the Risk Management Program list. In the early 1990s, EPA considered listing reactive substances, such as AN, on the Risk Management Program list.561 Specifically, EPA assessed whether to include chemicals whose reactive properties could cause impacts on nearby communities in the event of an accident.562 In December 2002, CSB issued the study, “Improving Reactive Hazard Management,” which examined reactive hazard management across the United States.563 The study found regulatory coverage of reactive hazards to be a key issue.564 As a result of the study, CSB issued several regulatory recommendations, including the following recommendation to EPA: Revise the Accidental Release Prevention Requirements, 40 CFR 68, to explicitly cover catastrophic reactive hazards that have the potential to seriously impact the public, including

556 58 Federal Register 5102 (January 19, 1993). 557 Ibid. 558 Ibid. 559 Ibid. 560 Ibid. 561 Ibid. 562 Ibid. 563 CSB. “Hazard Investigation: Improving Reactive Hazard Management.” December 2001. 564 CSB. “Hazard Investigation: Improving Reactive Hazard Management.” December 2001, 3.

West Fertilizer Company Final Report January 2016 192 U.S. CHEMICAL SAFETY AND HAZARD INVESTIGATION BOARD

those resulting from self-reactive chemicals and combinations of chemicals and process-specific conditions. Take into account the recommendations of this report to OSHA on reactive hazard coverage. Seek congressional authority if necessary to amend the regulation.565 Unfortunately, EPA has not initiated rulemaking consistent with CSB’s recommendation more than 10 years since its issuance.566 Therefore, CSB has categorized the status of this recommendation as “Open— Unacceptable Response.”567 Since issuing its reactive hazard investigation study in 2002, CSB has investigated several industrial accidents involving reactive chemicals.568 These are summarized in Table 12. Table 12. CSB Investigations Involving Reactive Chemicals Since 2002 Incident Date Location Severity First Chemical Corp.: Reactive Chemical Explosion October 13, 2002 Pascagoula, MS • 3 injured MFG Chemical Inc.: Toxic Gas Release April 12, 2004 Dalton, GA • 154 hospitalized Synthron Chemical: Explosion July 31, 2007 Morganton, NC • 1 fatality • 12 injured T2 Laboratories Inc.: Reactive Chemical Explosion December 19, 2007 Jacksonville, FL • 4 fatalities • 13 hospitalized Bayer CropScience: Pesticide Waste Tank Explosion August 28, 2008 Institute, WV • 2 fatalities West Fertilizer Company: Explosion and Fire April 17, 2013 West, TX • 15 fatalities • More than 260 injured

It is important to note, however, that Table 12 depicts only those incidents involving reactive chemicals that CSB investigated since 2002. That is, these incidents do not represent the universe of reactive chemical accidents, which is much larger.

565 CSB. “Hazard Investigation: Improving Reactive Hazard Management.” December 2001, 102. 566 CSB. “Recommendations Status Change Summary.” Improving Reactive Hazard Management, 2001-1-H-R3. March 11, 2014. 567 See: http://www.csb.gov/recommendations/?F_RecipientId=8 (accessed on December 17, 2015). OSHA’s associated recommendations are also categorized as “Open—Unacceptable Response.” See: http://www.csb.gov/UserFiles/file/CSB-OSHACorrespondence.pdf (accessed on January 15, 2016). 568 CSB. “Recommendations Status Change Summary.” Improving Reactive Hazard Management, 2001-1-H-R3. March 11, 2014.

West Fertilizer Company Final Report January 2016 193 U.S. CHEMICAL SAFETY AND HAZARD INVESTIGATION BOARD

  1. 4.2.3.1.1 General Duty Clause

After the incident, CSB referenced its reactives study in “Preliminary Findings of the CSB from its Investigation of the West Fertilizer Explosion and Fire.”569 With respect to the EPA Risk Management Program rule, CSB specifically stated: In developing the RMP regulation, the EPA did not explicitly include explosives or reactive chemicals in the list of covered chemicals. In 2002, the CSB issued a study on reactive hazards, identifying 167 prior reactive incidents (including a 1994 explosion at an AN manufacturer). The Board recommended that . . . EPA expand [its] standard[] to include reactive chemicals and hazards. However, [EPA has not] yet acted upon the recommendation[].570 On June 6, 2014, after learning the Open—Unacceptable Response status of its recommendation, EPA raised, in a letter to CSB, its concern that CSB had mischaracterized in its reactives study the scope and history of EPA’s use of the CAA Section 112(r)(1), General Duty Clause (GDC).571 Because the GDC is a provision which CSB believes likely could have been used to cite the WFC facility, but was not, CSB conducted further research into the requirement. The GDC is a statutory obligation that makes owners and operators of facilities that possess regulated and other extremely hazardous substances responsible for ensuring that their chemicals are managed safely.572 In CAA Section 112(r)(1), the GDC states: The owners and operators of stationary sources producing, processing, handling or storing such substances [i.e., a chemical in 40 CFR Part 68 or any other extremely hazardous substance] have a general duty [in the same manner and to the same extent as the general duty clause in the Occupational Safety and Health Act] to identify hazards which may result from (such) releases using appropriate hazard assessment techniques, to design and maintain a safe facility taking such steps as are necessary to prevent releases, and to minimize the consequences of accidental releases which do occur.573 Accordingly, EPA has the authority to apply the GDC to facilities not only after incidents, but also before incidents to prevent them. The GDC is a broad provision with great potential to enhance safety measures at facilities that contain certain hazardous substances. In addressing the hazards associated with reactive substances and application of the GDC, CSB has stated that “many substances are unlikely to be considered ‘extremely hazardous’ since they do not present an inherent catastrophic reactive hazard until combined with other chemicals or under process-specific conditions.”574 This circumstance should not preclude, and EPA affirms has not precluded, such

569 CSB. “Preliminary Findings of the U.S. Chemical Safety Board from its Investigation of the West Fertilizer Explosion and Fire,” June 27, 2013. 570 Ibid. 571 EPA letter to CSB, June 6, 2014. 572 See: http://www2.epa.gov/sites/production/files/2013-10/documents/gdc-fact.pdf (accessed on December 29, 2015). 573 42 U.S.C. § 7412(r)(1). 574 CSB. “Recommendations Status Change Summary.” Improving Reactive Hazard Management, 2001-1-H-R3. March 11, 2014.

West Fertilizer Company Final Report January 2016 194 U.S. CHEMICAL SAFETY AND HAZARD INVESTIGATION BOARD

substances from enforcement under the GDC. EPA referenced a 1989 Report of the Senate Environment and Public Works Committee, which stated that the presumption should be that a substance is extremely hazardous if it causes significant adverse impacts by acute toxic effect or “by blast, fire, corrosion or other reaction.”575 The report also states that “extremely hazardous substances” would “include other agents which may or may not be listed” that “as the result of short-term exposures associated with [accidental] releases to the air cause death, injury or property damage due to their toxicity, reactivity, flammability, volatility, or corrosivity.”576 According to this report, therefore, EPA could apply the GDC to reactive substances. However, EPA did not use the GDC to cite the WFC after the incident for its unsafe storage of FGAN. Considering the totality of the EPA regulatory landscape, CSB determined that requirements for facilities to safely store and handle FGAN are insufficient. As discussed, the Risk Management Program rule does not regulate FGAN because FGAN is not on the list of regulated substances. Furthermore, while EPA could use the GDC to impose requirements on facilities to ensure the safe management of FGAN as a reactive substance, EPA does not contend that the GDC is as easy to apply as a regulation. EPA may have been able to apply the GDC against the WFC after the incident, but it did not. Therefore, without more from the GDC, it is the recommendation of CSB that FGAN be included on the Risk Management Program list, especially in light of the fatal incident in West, Texas. 8.4.2.4 Risk Management Program Rule and Coverage of Anhydrous Ammonia As previously discussed, although the WFC was not covered under the Risk Management Program rule for its storage of FGAN, it was covered under Program Level 2577 of the rule for its storage of more than 10,000 pounds, the threshold limit, of anhydrous ammonia. The facility submitted its RMP registration in 1999, 2006,578 and 2011.579 The WFC’s 2006 RMP for anhydrous ammonia included important safety elements to prevent, control, and respond to an anhydrous ammonia release.580 For example, the insurance company conducted a hazard review to identify major release scenarios and address actions that would prevent or mitigate a release.581 Another important feature of the RMP was development of an emergency action plan with step-by-step procedures, detailing how employees should respond to an anhydrous ammonia release.582 Other program elements included operating procedures, maintenance and

575 EPA letter to CSB, June 6, 2014. 576 Senate Committee on Environment and Public Works, CAA Amendments of 1989, Senate Report No. 228, 101st Congress, 1st Session 211 (1989). 577 The WFC fell under Program 2 requirements for its storage of anhydrous ammonia because it did not meet the requirements for Program Level 3 and was not eligible for Program Level 1 coverage. 578 The WFC did not resubmit its RMP registration as it was supposed to in 2004 because of a change in ownership. EPA cited the company in 2006 for failing to refile its RMP in a timely manner. The WFC refiled it in 2006. 579 WFC RMP submissions to EPA. 580 Ibid. 581 Ibid. 582 Ibid.

West Fertilizer Company Final Report January 2016 195 U.S. CHEMICAL SAFETY AND HAZARD INVESTIGATION BOARD

inspection programs, training programs, incident investigations, offsite consequence analyses, and compliance audits.583 The Risk Management Program rule also required the WFC to comply with RAGAGEP for anhydrous ammonia, such as ANSI K61.1, “Safety Requirements for the Storage and Handling of Anhydrous Ammonia,” and OSHA’s Storage and Handling of Anhydrous Ammonia regulation (29 CFR 1910.111).584 As previously mentioned, the Risk Management Program list does not include FGAN, so the WFC was not required to take related Risk Management Program safety measures for FGAN. Of course, FGAN coverage under the Risk Management Program rule likely would have increased awareness of the explosion hazards of FGAN, leading to better management of the substance through compliance with federal safety regulations and best industry practices. If EPA had included FGAN under the Risk Management Program rule, the WFC would have been required to apply it for its storage of FGAN and perhaps could have reduced the risk of catastrophic accidents like the one that occurred at the WFC. 8.5 Emergency Planning The CSB investigation of the WFC incident identified the explosive potential of FGAN. CSB further found that no immediate evacuation at the first sign of fire occurred, in part because no in-place emergency plan addressed response specifically to an incident at the WFC warehouse. This situation left emergency responders and the West community unaware of the urgent need to evacuate. For FGAN facilities, there must be a well-exercised local emergency plan that emphasizes immediate notification to emergency responders and the community at the first sign of fire, as well as evacuation protocols. If there was an immediate evacuation once the fire was detected at the WFC, the number of fatalities and injuries likely would have been lower. Emergency planning is part of emergency management, which includes four different stages: (1) mitigation, (2) planning, (3) response, and (4) recovery. The nation’s emergency management system is intended to prepare communities for all types of hazards, including natural disasters, terrorism, and hazardous materials (HAZMAT) incidents. The responsibilities of emergency management personnel are shared among federal agencies that provide assistance through funding and training. For example, DHS primarily focuses its efforts on terrorism and natural hazards and also serves as the umbrella organization for other agencies that supply assistance to state and local authorities. Other federal agencies such as EPA and OSHA have emergency planning regulations for environmental and occupational accidents involving HAZMAT. The next sections discuss these regulations at the federal, state, and city levels and discuss their relevance to the WFC incident.

583 Ibid. 584 40 CFR 68.48(b).

West Fertilizer Company Final Report January 2016 196 U.S. CHEMICAL SAFETY AND HAZARD INVESTIGATION BOARD

  1. 5.1 Federal Emergency Planning

In response to growing concerns about the safety and health of people and the environment after releases of hazardous substances in the U.S. in the 1970s and 1980s and the disaster in Bhopal, India, Congress passed new laws authorizing EPA and OSHA to regulate these risks. One was the Emergency Planning and Community Right-to-Know Act (EPCRA) of 1986, which was intended to address concerns about local preparedness for chemical emergencies and to ensure public access to information. EPCRA established a framework for states to organize resources to pre-plan for chemical accidents. EPCRA requirements include: (1) emergency planning (SARA Title III, Sections 301–303); and (2) emergency and hazardous chemical inventory reporting (SARA Title III, Sections 311 and 312).585 Each section of EPCRA covers a subset of chemicals and the statute and EPA regulations specify quantities that trigger reporting requirements (Table 13).586 Because they are pertinent to the WFC incident, requirements for emergency planning and hazardous chemical inventory reporting are discussed in greater detail. Table 13. EPCRA Chemicals and Reporting Thresholds

Section 302 Sections 311 and 312 Chemicals Covered 355 extremely hazardous substances (EHSs) Approximately 500,000 hazardous chemicals Thresholds Threshold planning quantity (TPQ): 1 to 10,000 lbs. onsite at any one time 500 lbs. or TPQ, whichever is lower, for EHSs; 75,000 gallons for gasoline; 100,000 gallons for diesel; and 10,000 lbs. for all other hazardous chemicals

EPCRA emergency planning establishes, in part, requirements for sharing information among industry and state, tribal, and local governments. As shown in Table 13, under Section 302, a facility that has an extremely hazardous substance (EHS) at or above its specific threshold planning quantity (TPQ) must report the substance. Reporting of EHSs, as well as other hazardous chemicals under Sections 311 and 312, must be made to the State Emergency Response Commission (SERC), Local Emergency Planning Committee (LEPC), and local fire department.587 State governors designated the SERCs which then designated roughly 3,500 local emergency planning districts and LEPCs for each district.588 At minimum, LEPCs must be composed of elected state and local officials; police, fire, civil defense, public health, transportation, and environmental professionals; representatives of facilities subject to EPCRA emergency planning requirements; community groups; and

585 Regulations implementing EPCRA are codified at 40 CFR Parts 350–372. 586 See: http://www2.epa.gov/sites/production/files/2013-08/documents/epcra_fact_sheet.pdf (accessed on December 29, 2015). 587 The local fire department receives only inventory information under Sections 311 and 312. 588 See: http://www2.epa.gov/sites/production/files/2013-08/documents/epcra_fact_sheet.pdf (accessed on December 29, 2015).

West Fertilizer Company Final Report January 2016 197 U.S. CHEMICAL SAFETY AND HAZARD INVESTIGATION BOARD

the media.589 SERCs are supposed to supervise and coordinate the activities of LEPCs, establish procedures for receiving and processing public requests for information, and review local emergency response plans.590 LEPCs are supposed to develop emergency response plans, review the plans annually, and provide information to the public.591 EPCRA emergency planning also requires LEPCs to develop and update emergency response plans. LEPCs are supposed to use information reported by facilities to develop these plans, which cover procedures that describe how emergency responders should respond to chemical releases.592 The plans must (1) identify EHS facilities and transportation routes; (2) describe emergency response procedures, onsite and offsite; (3) designate a community coordinator and facility coordinators to implement the plan; (4) outline emergency notification procedures; (5) explain the means to determine the probable area and population affected by chemical releases; (6) describe local emergency equipment and facilities and the people responsible for them; (7) outline evacuation plans; (8) provide a training program for emergency responders (including schedules); and (9) detail methods and schedules for exercising emergency response plans.593 Importantly, EPCRA emergency planning requirements mandate the identification of facilities with EHSs only; identification of facilities without EHSs is not required. Thus, although facilities must report EHSs and certain non-EHSs (i.e., other hazardous chemicals under Sections 311 and 312), only facilities with EHSs trigger EPCRA emergency response plan requirements.594 For purposes of the WFC investigation, CSB determined that while anhydrous ammonia is on the EHS list, FGAN is not. CSB found, however, that AN is on the list of hazardous chemicals under Sections 311 and 312 that triggers emergency and hazardous chemical inventory reporting requirements. EPCRA emergency and hazardous chemical inventory reporting requires reporting of certain quantities of EHSs and hazardous chemicals. As shown in Table 13, under Sections 311 and 312, an EHS must be reported if it is held at the lower of 500 pounds or the substance’s TPQ, gasoline must be reported at 75,000 gallons, diesel must be reported at 100,000 gallons, and all other hazardous chemicals must be reported at 10,000 pounds.595 These reporting requirements are tied to OSHA’s Hazard Communication Standard (29 CFR 1910.1200). This standard requires employers to maintain SDSs for all hazardous chemicals in the workplace.596 SDSs contain crucial information, including chemical and hazard

589 Ibid. See also: 42 U.S.C. §11001(c). 590 Ibid. See also: 42 U.S.C. §11001(a). 591 Ibid. See also: 42 U.S.C. §11001(c). 592 See: http://www2.epa.gov/sites/production/files/2013-08/documents/epcra_fact_sheet.pdf (accessed on December 29, 2015). 593 Ibid. See also: 42 U.S.C. §11003(c). 594 It should be noted that EPA has suggested, through guidance to SERCs and LEPCs (including the most recent fact sheet to these entities), that they include Sections 311 and 312 facilities in their planning process. 595 See: http://www.epa.gov/sites/production/files/2013-08/documents/epcra_fact_sheet.pdf (accessed on December 29, 2015). 596 Ibid.

West Fertilizer Company Final Report January 2016 198 U.S. CHEMICAL SAFETY AND HAZARD INVESTIGATION BOARD

identification; ingredient composition; first aid measures; firefighting measures; accidental release measures; handling and storage precautions; exposure controls and personal protection; physical and chemical properties; stability and reactivity properties; toxicological information; ecological concerns; disposal considerations; transport information; regulatory requirements; and other information.597 Facilities must maintain SDSs onsite and submit copies of them (or a list of SDS-covered chemicals) to their SERCs, LEPCs, and local fire departments.598 Facilities covered by Section 311 must also submit Emergency and Hazardous Chemical Inventory forms to their SERCs, LEPCs, and local fire departments annually.599 Facilities provide either a Tier I or Tier II inventory form.600 Tier I inventory form include the following aggregate information for each applicable hazard category: • An estimate (in ranges) of the maximum amount of hazardous chemicals for each category present at the facility at any time during the preceding calendar year. • An estimate (in ranges) of the average daily amount of hazardous chemicals in each category. • The general location of hazardous chemicals in each category.601 The Tier II inventory form contains basically the same information as the Tier I, but it must list the specific chemicals. Tier II inventory form provide the following for each chemical: • The chemical name or the common name as indicated on the SDS. • An estimate (in ranges) of the maximum amount of the chemical present at any time during the preceding calendar year and the average daily amount. • A brief description of the manner of storage of the chemical. • The location of the chemical at the facility. • An indication of whether the owner elects to withhold location information from disclosure to the public.602 Information submitted under Sections 311 and 312 is available to the public from SERCs and LEPCs.603

597 See: https://www.osha.gov/Publications/HazComm_QuickCard_SafetyData.html (accessed on December 29, 2015). OSHA does not enforce the ecological information, disposal considerations, transport information, and regulatory information sections of SDSs because other agencies regulate this information. 598 See: http://www2.epa.gov/sites/production/files/2013-08/documents/epcra_fact_sheet.pdf (accessed on December 29, 2015). 599 Ibid. 600 Ibid. 601 Ibid. 602 Ibid. It is important to note that under Section 312(f), upon request by the fire department with jurisdiction over the facility, owners/operators must provide fire departments with location information. They must also allow fire departments to conduct onsite inspections. 603 Ibid.

West Fertilizer Company Final Report January 2016 199 U.S. CHEMICAL SAFETY AND HAZARD INVESTIGATION BOARD

  1. 5.2 State Emergency Planning in the State of Texas

Texas has suffered some of the worst disasters in U.S. history, both in kind and magnitude. One of the first was the devastating hurricane in Galveston in 1900, which almost destroyed the city and killed thousands. In 1937, in New London, a gas leak explosion destroyed a school and killed approximately 300 students and teachers. Ten years later, the FGAN explosion in Texas City inflicted an enormous loss of life and property that remains unknown to this day; it is ranked as one of the worst industrial accidents in U.S. history.604 As a result of these disasters, Texas enacted statutes to address all-hazard emergency management.605 The Texas Disaster Act of 1975 requires local jurisdictions to designate an emergency management coordinator to develop an emergency operations plan composed of a basic plan with 22 annexes.606 The basic plan and its annexes outline guidance for emergency management activities and assign roles and responsibilities to local agencies.607 Although the basic plan offers general guidance, the annexes provide more detail.608 For example, Annex Q, “Hazardous Materials and Oil Spill Response,” identifies the HAZMAT incidents that could occur in a specific community and how such an incident would likely affect nearby populations.609 Once a hazard is identified, appropriate response actions must be planned, including timely notification, identification of evacuation routes, and assignment of roles and responsibilities.610 Training exercises and drills must also test response effectiveness.611 When Congress enacted EPCRA in 1986, its provisions were incorporated into Texas’s existing emergency planning framework and into state codes.612 The SERC is the Emergency Management Council of Texas and includes participation from multiple state agencies.613 Within that group of agencies, 10 are considered to be SERC members with specific roles in emergency response and planning. For example, the TCEQ is responsible for receiving reports about accidental spills and releases;614 the Texas Department of State Health Services is designated to receive the Tier I or Tier II Emergency and Hazardous Chemical Inventory forms submitted electronically by facilities;615 and the Texas Department of Public Safety, Division of Emergency Management, is tasked with overseeing the

604 Texas Emergency Management Executive Guide (FY 2014 Edition). 605 Ibid. 606 Texas Administrative Code, Title 37, Part 1, Chapter 7. Texas Government Code, Chapter 418. 607 See: Texas Emergency Management Executive Guide (FY 2014 Edition), 4. 608 Ibid. 609 See: McLennan County. Annex Q: Hazardous Materials & Oil Spill Response. Version 2.4, July 2009. 610 See: Texas Emergency Management Executive Guide (FY 2014 Edition), 4. 611 Ibid. 612 Texas Health and Safety Code, Title 6, Subtitle D, “Hazardous Substances,” Chapters 505 through 507. Texas Administrative Code, Title 37, Part 1, Chapter 7. Texas Government Code, Chapter 418. 613 Texas Department of Public Safety. See: https://www.txdps.state.tx.us/dem/stateLocalOrganizations.htm#EMC (accessed on December 29, 2015). 614 See: https://www.tceq.texas.gov/response/spills (accessed on December 29, 2015). 615 This designation has changed since the date of the WFC incident. The Tier II Chemical Reporting Program has moved to the TCEQ. See: https://www.dshs.state.tx.us/tiertwo/ (accessed on December 29, 2015).

West Fertilizer Company Final Report January 2016 200 U.S. CHEMICAL SAFETY AND HAZARD INVESTIGATION BOARD

all-hazard emergency management program and providing guidance and funding for cities, counties, and state agencies so that they can develop their own programs.616 8.5.3 City Emergency Planning in the City of West To fully understand the WFC incident, this section reviews emergency planning and management in West and at the WFC facility. West is located in McLennan County, which is West’s local emergency management district and which formed an LEPC in 1992. The McLennan County LEPC meets four times per year.617 Its members are nominated by the county judge and approved by the SERC.618 The LEPC membership consists of city, industry, hospital, and emergency response officials.619 CSB found that the WFC, however, was not listed on the attendance roster for any LEPC meeting for more than 21 years. As required by both state and federal regulations, the McLennan County LEPC prepared an emergency response plan (ERP) in accordance with guidance from the Texas Department of Public Safety, Division of Emergency Management.620 As discussed previously, this consisted of a basic plan with 22 annexes. It described in part McLennan County’s approach toward emergency planning, response, and notification. McLennan County officials review the plan annually and officially revise or update it every 5 years, as required by Texas law.621 Prior to the WFC incident, McLennan County last formally reviewed its ERP in 2010.622 The McLennan County ERP includes procedures on how to alert the public when natural or human- initiated disasters occur. ERP annexes describe actions to take in various scenarios, such as how to disseminate information quickly,623 how to warn special facilities (e.g., hospitals and schools) and populations of a hazard,624 and how to use alert systems to activate immediate evacuation.625 A vital component of ERPs and ERP annexes is LEPC engagement and communication. Without these, community members might not have the necessary information to respond appropriately to a specific type of incident. For example, on February 12, 2013, WIS was temporarily evacuated because of a controlled burn at the WFC facility. Before the evacuation, the school principal alerted 911 of the fire, but the 911 dispatcher did not acknowledge a coordinated burn. Students and staff were evacuated for approximately 30 minutes to WMS, using coordinated transportation. The WFC did not notify the WISD or WIS in advance that the

616 See: https://www.txdps.state.tx.us/internetforms/Forms/TDEM-10.pdf (accessed on December 29, 2015). 617 McLennan County LEPC Bylaws, Article II, Section 5, “Meetings.” 618 McLennan County LEPC Bylaws, Article II, Section 1, “Membership.” 619 Ibid. 620 State of Texas. Local Emergency Planning Committee (LEPC): A Primer for Local Planning for Hazardous Materials, July 2006. 621 Texas Administrative Code, Title 37, Part 1, Chapter 7, Subchapter B, Rule 7.12. 622 CSB reviewed the 2010 McLennan County ERP for this investigation report. 623 McLennan County Basic Plan, Annex I. 624 McLennan County Basic Plan, Annex E. 625 Ibid.

West Fertilizer Company Final Report January 2016 201 U.S. CHEMICAL SAFETY AND HAZARD INVESTIGATION BOARD

facility was conducting a controlled burn of pallets and brush. After this incident, the WISD asked the emergency service providers and the WFC to provide advance notice of future burning activities. The WFC could have communicated its plans to the WISD or WIS through LEPC activities. The McLennan County ERP specifically includes Annex Q, “Hazardous Material and Oil Spill Response,” which requires identification of all regulated facilities within the county.626 Such facilities are those that are regulated by EPCRA. In particular, a regulated facility is: A plant site where handling/transfer, processing, and/or storage of chemicals is performed. For the purposes of [Annex Q], regulated facilities (1) produce, use, or store EHSs in quantities which exceed threshold planning quantities or (2) hold one or more hazardous chemicals in a quantity greater than 10,000 pounds at any time.627 Because the WFC was regulated by EPCRA, it would follow that Annex Q might list the WFC. However, the WFC was not listed. EPCRA covered the WFC for at least two reasons. First, the WFC stored anhydrous ammonia in quantities that exceeded the anhydrous ammonia TPQ of 500 pounds. Specifically, CSB found that the WFC reported holding 34,000 pounds of anhydrous ammonia at the time of the incident. Clearly, the WFC had onsite sufficient amounts of an EPCRA Section 302 EHS. This triggered not only reporting requirements, but also emergency response planning requirements.628 Thus, the WFC should have been listed in Annex Q for its EPCRA-regulated storage of anhydrous ammonia. Second, the WFC stored FGAN, a hazardous chemical under EPCRA Sections 311 and 312, in quantities that exceeded the AN threshold quantity of 10,000 pounds. In particular, CSB found that the WFC reported 80,000 to 120,000 pounds of FGAN onsite at the time of the incident. As such, the WFC was required to report its quantities of FGAN under EPCRA. CSB obtained WFC Tier II form documents, dated from 2000 to 2012, and found that the WFC annually reported its quantities of anhydrous ammonia to the WVFD, McLennan County LEPC, and Texas Department of State Health Services, but reported its FGAN only in its 2012 Tier II report. Ideally, under the best set of circumstances, the WFC should have been listed in Annex Q for its storage of FGAN. The WFC was not listed in Annex Q, however, due to a misunderstanding of EPCRA’s agricultural use exemption. EPCRA’s agricultural use exemption is a statutory exemption to the definition of “hazardous chemical.” It reads: Hazardous Chemical Defined. For purposes of this section, the term “hazardous chemical” has the meaning given such term by section 1910.1200(c) of title 29 of the Code of Federal

626 McLennan County Basic Plan, Annex Q. 627 Ibid. 628 The WFC was also expected to develop an emergency response plan for its storage of anhydrous ammonia, as required by the Risk Management Program rule. According to EPA, the EPCRA plan and the RMP must be coordinated. See: http://www2.epa.gov/sites/production/files/2013-11/documents/chap-08-final.pdf (accessed on December 29, 2015). However, no evidence indicated that the WFC RMP was shared with the LEPC or the WVFD.

West Fertilizer Company Final Report January 2016 202 U.S. CHEMICAL SAFETY AND HAZARD INVESTIGATION BOARD

Regulations, except that such term does not include the following: . . . Any substance to the extent it is used in routine agricultural operations or is a fertilizer held for sale by a retailer to the ultimate customer.629 It is important to note that this exemption may apply only to Sections 311 and 312 reporting requirements; it does not apply to emergency planning requirements under Section 302. Furthermore, the agricultural use exemption applies directly to the hazardous chemical itself, not the specific individual or entity holding the chemical. That is, the exemption does not relieve an individual or entity of its responsibilities; rather, the individual or entity is exempt from EPCRA reporting requirements if the chemical in question is exempt. Where individuals or entities hold multiple chemicals, each chemical must be assessed individually to determine exemption status. The agricultural use exemption impacts those who use substances in “routine agricultural operations” and retailers who hold substances as fertilizer for sale to the ultimate customer. With respect to those who use substances in routine agricultural operations, CSB referred to guidance on EPA’s website that, in response to a question asking which hazardous chemicals are reportable for farmers under Sections 311 and 312, states: Under Section 311(e)(5), any substance when used in routine agricultural operations is exempt from reporting under Section 311 and 312. This exemption is designed to eliminate the reporting of fertilizers, pesticides, and other chemicals when stored, applied, or otherwise used at the farm facility as part of routine agricultural activities. . . . Thus, the storage and use of a pesticide or fertilizer on a farm would be considered the use of a chemical in routine agricultural operations and is, therefore, exempt under Sections 311 and 312.630 The belief is that minimal risk is involved when farmers use a substance in routine agricultural operations because farmers promptly apply those substances to their crops. Therefore, the exemption eliminates EPCRA reporting requirements under Sections 311 and 312 for at least certain farmers. However, for retailers who hold a substance as fertilizer for sale to the ultimate customer, CSB found that although EPA has published several hypothetical-based questions and answers on its website, it offers little general guidance. CSB discovered that the McLennan County LEPC reported that the WFC’s storage of anhydrous ammonia and FGAN appeared to qualify under EPCRA’s agricultural use exemption, a conclusion which the county stated was also confirmed by the SERC. The WFC’s anhydrous ammonia and FGAN were erroneously considered exempt from both emergency planning and hazardous chemical inventory reporting requirements because of the phrase “fertilizer held for sale by a retailer631 to the ultimate customer” and because the main WFC customers who bought fertilizer were nearby farmers (ultimate

629 EPCRA, Section 311(e)(5). 40 CFR 370.66. 630 See: https://emergencymanagement.zendesk.com/hc/en-us/articles/211416278-What-hazardous-chemicals-are- reportable-for-farmers-under-311-and-312- (accessed on December 29, 2015). It should be noted, however, that although farmers may be exempt under Section 311(e)(5) from reporting these fertilizers in their Sections 311 and 312 reports, they are still required to notify the SERC (or TERC), LEPC (or TEPC), and local fire department under Section 302 if they have an EHS at or above its TPQ. 631 There is no definition of “retailer” under EPCRA.

West Fertilizer Company Final Report January 2016 203 U.S. CHEMICAL SAFETY AND HAZARD INVESTIGATION BOARD

customers / end users). This reason likely explains why the McLennan County LEPC ERP did not include the WFC for its storage of anhydrous ammonia, despite the fact that the exemption does not relieve reporting requirements for EHSs under Section 302. Because the WFC facility not only sold pure fertilizer but also blended chemicals to make fertilizer (e.g., for custom orders), CSB also examined how the agricultural use exemption applies to blends. EPA states that chemicals “held for the purpose of producing fertilizer” are “starting materials used to make a fertilizer,” not the fertilizer itself, so the retailer therefore should report them.632 EPA recognizes, however, that if those chemicals are not blended but rather sold individually to the end customer, then those chemicals are exempt.633 EPA confirmed this position in a September 3, 2010, letter to TFI, stating that the “mixing of fertilizers” must be reported and reiterating that “fertilizer held for sale by a retailer to the ultimate customer . . . is one that is merely held for sale, not one that is mixed or formulated.”634 To bolster its reasoning, EPA further explained: Congress’ intent was to focus Section 311/312 reporting on manufacturers and wholesalers— those are facilities that typically have large quantities of fertilizer, and that use and manufacture a wide range of chemical compounds. Congress appreciated that such manufacturers and wholesalers presented significant risks that needed to be addressed by emergency response authorities, but that mere retailers did not. Assuming arguendo that Congress’ intent is ambiguous, the above interpretation is one that EPA adopts as being the most reasonable interpretation of the statute. Therefore, consistent with the Agency’s prior Q&A guidance, the amount of chemicals intended for blending and the new product should be reported under Section 311 and 312 if the reporting thresholds are exceeded.635 On this basis, facilities that blend chemicals to make fertilizer such as the WFC should not apply the agricultural use exemption to those chemicals meant for blending. However, there is confusion about both who specifically qualifies for the exemption as well as the issue of blending because, although hypothetical-based Q&As are available, limited general EPA guidance exists. Therefore, EPA should develop a general guidance document pertaining to EPCRA’s agricultural use exemption and make a widespread effort to communicate its contents to the fertilizer industry. Since the incident, the Agricultural Retailers Association (ARA), a nonprofit trade association that represents the interests of agricultural retailers and distributors on legislative and regulatory issues, issued an alert to its members on May 14, 2013, warning agricultural retailers that blend (i.e., use nonchemical reactions to mix) dry fertilizers to report those fertilizers on their annual Tier I or Tier II inventory reports submitted to SERCs, LEPCs, and local fire departments. The alert also warned members that EPA has

632 See: https://emergencymanagement.zendesk.com/hc/en-us/articles/212089537-Are-hazardous-chemicals-blended- for-fertilizer-exempted-under-agricultural-use-exemption- (accessed on December 29, 2015). 633 Ibid. 634 Dana S. Tulis, EPA Acting Director Office of Emergency Management. Letter to Chris S. Leason, counsel to TFI, September 3, 2010. 635 Ibid.

West Fertilizer Company Final Report January 2016 204 U.S. CHEMICAL SAFETY AND HAZARD INVESTIGATION BOARD

cited agricultural retailers for incomplete inventory forms.636 TFI further noted in a verbal statement on November 15, 2013, at the Washington, DC, “Listening Session Regarding President Obama’s Executive Order Improving Chemical Facility Safety and Security”: As most of you know, there is a fertilizer retail exclusion for reporting under EPCRA. TFI supports removal of this exclusion. We feel everyone should report hazardous chemicals stored on site to the LEPC and SERC and work with local fire departments without exception.637 Despite these post-incident efforts, the ARA and TFI cover only some of the thousands of FGAN facilities in the United States. Consequently, EPA should take steps to ensure that fertilizer facilities fully comply with EPCRA and do not mistakenly apply the agricultural use exemption. In fact, EPA already hosted, from May to September 2014, 32 workshops for members of Local Emergency Planning Committees, which were held in Texas, Arkansas, Louisiana, Oklahoma, and New Mexico and attended by 1,340 representatives from local, state, and federal government as well as industry.638 It also recently released an online training module of key requirements for SERCs and LEPCs and a factsheet, “How to Better Prepare Your Community for a Chemical Emergency: A Guide for State, Tribal, and Local Agencies.”639 While these efforts demonstrate progress, CSB believes the development of more general EPCRA guidance, as well as a guidance document on the agricultural use exemption, could help significantly improve emergency planning at all levels. 8.5.4 Other Emergency Planning Requirements During the course of its investigation, CSB also found issues in emergency planning related to FGAN training and compliance with OSHA’s Hazardous Waste Operations and Emergency Response (HAZWOPER) standard (29 CFR 1910.120). CSB determined that employees at the WFC had limited training on FGAN hazards. The agency learned through interviews that some WFC employees were unaware that the FGAN fertilizer stored onsite could explode. Many said the April 1995 Oklahoma City bombing was the only basis of their knowledge of this. Nonetheless, WFC employees generally understood FGAN security regulations so as to verify that customers buying FGAN were registered and were using it only for agricultural purposes. CSB found that the lack of formal training at the WFC was a central reason why employees were largely unaware of FGAN hazards. Some WFC employees recalled having discussions about avoiding FGAN contact with heat, fire, and moisture. However, CSB concluded that FGAN safety training was inconsistent and that no formal training addressed FGAN hazards or required discussion of the FGAN SDS. WFC employees also lacked formal training on the facility’s ERP for anhydrous ammonia. Employees informally shared information

636 Unfortunately, the alert, even if made before the date of the incident, would have had little impact on the WFC because the facility was not a member of the ARA. 637 See: http://www.tfi.org/media-center/news-releases/tfis-verbal-statement-presented-nov-15-washington-dc- listening-session-re (accessed on December 29, 2015). 638 See: https://www.osha.gov/chemicalexecutiveorder/EO13650FS-ImprovingChemicalFacilitySafety.pdf (accessed on December 29, 2015). 639 Ibid.

West Fertilizer Company Final Report January 2016 205 U.S. CHEMICAL SAFETY AND HAZARD INVESTIGATION BOARD

so that they knew to evacuate as far as possible if such a release occurred. They also knew which emergency numbers to call. However, much of the WFC employee training was hands on and job specific. Thus, a lack of comprehensive emergency planning and response training played a role in how the incident unfolded. In addition, CSB discovered issues with OSHA’s HAZWOPER standard, which too is an integral element of emergency planning. Under the HAZWOPER standard, the WFC was required to develop an ERP for all “hazardous substances.” As defined by the standard, hazardous substances include those covered by EPA or DOT.640 FGAN meets this definition because it is listed in DOT’s Hazardous Materials Table.641 The WFC was therefore required to develop a HAZWOPER ERP, or would be considered exempt if it met another OSHA standard, Emergency Actions Plans (29 CFR 1910.38).642 The HAZWOPER ERP should have addressed pre-emergency planning and coordination with outside parties, personnel roles, lines of authority, training and communication, emergency recognition and prevention, safe distances and places of refuge, site security and control, evacuation routes and procedures, decontamination, and emergency medical treatment and first aid.643 However, no evidence indicated that the WFC developed the HAZWOPER ERP or was considered exempt under the Emergency Action Plans standard for FGAN. Consequently, OSHA cited the WFC after the incident for not providing an FGAN-related HAZWOPER ERP. 8.6 Fire Protection Codes and Standards Fire protection codes and standards generally refer to the most recently developed practices to protect people and property from fire and natural disasters. When adopted by states or local jurisdictions, codes (including building, electrical, plumbing, mechanical, and other codes) represent mandatory regulations. Standards, on the other hand, provide methods to achieve compliance with codes. Both codes and standards must be adopted through some process, usually state-level fire or building codes. The legislature must enact that adoption before a fire protection (or prevention) code or standard applies. Because fire and building codes may also include references to many standards, such standards are generally not adopted separately but instead are included once the fire or building code is adopted. Fire codes specify practices that must be followed; that is, codes are mandatory only if adopted. In contrast, fire protection standards typically refer to practices that, despite their mandatory language, are voluntary unless adopted into law (e.g., as a state fire code). The nation’s leading fire protection codes and standards are issued by the NFPA and the International Code Council (ICC). Both employ a public consensus process to produce model codes and standards that jurisdictions can adopt into law. The NFPA updated its current code for FGAN, NFPA 400 (Hazardous Materials Code) Chapter 11, after the WFC

640 29 CFR 1910(a)(3). 641 49 CFR 172.101. 642 29 CFR 1910.120(q)(1). 643 29 CFR 1910.120(q)(2).

West Fertilizer Company Final Report January 2016 206 U.S. CHEMICAL SAFETY AND HAZARD INVESTIGATION BOARD

incident to address the conditions that likely led to the FGAN detonation. The ICC’s International Fire Code (IFC) also addresses storage and handling of oxidizing materials. Texas does not have a state-wide fire code and as a result, most fire departments in the state have no authority to inspect facilities against, or compel them to follow the safe practices outline in these codes, unless a fire code is adopted at the county or city level. In July 2015, the Texas Department of Insurance did adopt NFPA 1 (Fire Code) for inspections by the Texas State Fire Marshal’s office on the complaint of any person. However, even if fire protection standards are incorporated into state and local fire codes, catastrophic incidents can occur when such standards are deficient. CSB reviewed the ICC IFC and NFPA 1 (Fire Code). The IFC is in use or adopted in 42 states,644 and NFPA 1 is adopted statewide in 19 states. CSB also researched fire protection codes on the state, county, and city levels—specifically, in the state of Texas, in McLennan County, and in the city of West. The first part of this section describes the NFPA, with details on the NFPA standard for FGAN. The second part of this section describes the ICC, with details on how it addresses HAZMAT. The third and last part of this section describes fire code regimes on a more local level and analyzes codes in Texas, which can be improved to better protect emergency responders and the public from fire events. 8.6.1 National Fire Protection Association The NFPA is an international nonprofit organization that develops and publishes industry consensus codes and standards, guides, and recommended practices associated with fire prevention and related hazards. Companies can voluntarily comply with NFPA codes and standards or can be required to follow a standard if it is adopted by reference in local, state, or federal laws (e.g., in a local or state fire code). Many of the NFPA codes and standards are also incorporated in OSHA regulations. The EPA Risk Management Program rule and OSHA PSM standard regulations require owners and operators of covered facilities to ensure that facility processes are designed to comply with RAGAGEP, which can include NFPA codes and standards. However, if these consensus codes and standards are deficient, they can lead to insufficient protections. 8.6.1.1 NFPA Code for FGAN AN requirements were first covered by NFPA 490 (Storage of Ammonium Nitrate), which was adopted in

  1. In 2010, NFPA withdrew NFPA 490 when it was incorporated into NFPA 400 (Hazardous

Materials Code). NFPA 400 establishes provisions for the storage, use, and handling of a number of hazardous substances, using four broad categories addressing building construction, storage requirements, fire protection systems, and general protections against fire. The 2013 edition had been published and was in effect at the time of the incident. The code has a specific chapter on AN (Chapter 11, “Ammonium Nitrate Solids and Liquids”). This distinguishes AN from other chapters because other chapters of the code are organized by chemical

644 The IFC is also adopted in the District of Columbia, NYC, Guam and Puerto Rico.

West Fertilizer Company Final Report January 2016 207 U.S. CHEMICAL SAFETY AND HAZARD INVESTIGATION BOARD

properties (such as “oxidizers” or “unstable or water reactive materials”) that can each apply to several chemicals. The scope of Chapter 11 covers “the storage, use, and handling of solid or liquid AN” in quantities exceeding 1,000 pounds. The chapter does not include FGAN manufacturing operations or the composition of FGAN designated as DOT hazard Class 1 explosives. The NFPA 400 code includes provisions for indoor and outdoor storage, fire protection systems, and general use; annexes offer additional guidance. In addition, the maximum allowable quantity (MAQ) designation is used in building and fire codes when addressing the storage, handling, and use of HAZMAT. The MAQ is integral to the NFPA 400 approach. It includes provisions for classifying materials, determining their MAQs, and adding other protective features if the intention is to use greater quantities of material. When evaluating the provisions in NFPA 400 (2013 Edition) against the factors that likely contributed to the WFC incident, CSB found code deficiencies concerning scope, building design, storage practices, and fire prevention and firefighting response for facilities that store bulk FGAN. However, it is important to note that the WFC would not have been required to comply with the code at the time of the incident unless the authority having jurisdiction enforced it retroactively. The WFC facility was constructed in 1962, so the requirements of NFPA 400 did not apply. Nonetheless, in response to some of the lessons learned from the WFC incident, CSB and other agencies and organizations participated in meetings with the NFPA Technical Committee on Hazardous Chemicals to provide input on the next revision of NFPA 400 (2016 Edition). A significant effort of the NFPA Technical Committee focused on addressing the requirements for existing FGAN storage facilities covered under NFPA 400 because the previous editions had primarily covered requirements for new facilities.645 As discussed, the wood construction of the WFC warehouse and bins that stored FGAN not only assisted in the rapid spread of the fire but also increased the sensitivity of the material that led to the detonation. In addition, the WFC warehouse had no installed fire detection or suppression systems, allowing the fire to spread through the building. If a building fire detection system had been operational, the early stages of the fire possibly could have been extinguished. Furthermore, sprinklers could have extinguished the fire before it could heat the FGAN pile sufficiently to produce a detonation. Similar to the OSHA Explosives and Blasting Agents standard, NFPA 400 (2013 Edition) allowed wood and combustible construction materials for bulk storage bins for FGAN as long as the bins were “protected against impregnation by FGAN.” The code noted in an annex that sodium silicate, epoxy coatings, or polyvinyl chloride (PVC) coatings were acceptable means to achieve this protection. However, the method used to coat the wood to resist FGAN impregnation does not prevent a fire. The presence of combustibles during a fire can create explosive conditions within a building that stores bulk FGAN. NFPA 400 (2016 Edition) now prohibits the use of combustible materials for all construction and bins at new facilities, even when coatings are applied to protect against FGAN impregnation.

645 Pearce, Nancy. “Safer Storage.” NFPA Journal, May 1, 2015.

West Fertilizer Company Final Report January 2016 208 U.S. CHEMICAL SAFETY AND HAZARD INVESTIGATION BOARD

However, the 2016 revisions to NFPA 400 do not apply the same requirements to prohibit combustible construction at existing facilities. The NFPA was challenged to reasonably specify construction requirements for facilities with combustible construction, which comprise the majority of FGAN storage facilities.646 To address existing facilities, NFPA 400 (2016 Edition) contains the new Section 11.1.5, “Protection of Existing Buildings.” This includes requirements that apply retroactively, where adopted, for existing buildings with combustible content. Facilities are required to install automatic fire sprinkler and detection systems. Activation of the fire detection system must automatically initiate an audible and visual alarm at the facility as well as a public notification or alert system to warn individuals located within one mile of the facility that they need to evacuate. Another shortcoming of NFPA 400 (2013 Edition) lies in Annex E, “Properties and Uses of Ammonium Nitrate and Fire-Fighting Procedures,” which called for large volumes of water to be applied as quickly as possible unless the fire reached “massive and uncontrollable proportions,” when responders were advised to evacuate and withdraw to a safe location. CSB found this guidance to be vague because the user had to determine when to categorize a fire as “massive and uncontrollable” and when to make the decision to evacuate rather than attempt to extinguish the fire. Because of FGAN’s unpredictable nature, immediate evacuation should be the first action for responders, using a minimum evacuation distance calculated in advance based on the quantity of FGAN stored. The 2013 edition of NFPA 400 did not require pre- planning, but given the events that unfolded during the WFC response, firefighters should also have a pre- incident plan to facilitate quick and effective decision making when responding to an FGAN fire. NFPA 400 (2016 Edition) now requires new and existing facilities to have emergency action plans that clearly state that “fire potentially affecting FGAN storage beyond the initial (incipient) stage shall not be approached by facility personnel.”647 The emergency plan must also specify whether the FGAN storage facility has a sprinkler system and whether it is constructed of combustible materials. For new facilities, the plan must establish a safe evacuation distance based on an approved648 analysis of potential offsite consequences. If no analysis has been performed, a distance of one mile should be used. The revised Annex E of NFPA 400 (2016 Edition) offers additional guidance to firefighters, including information on the conditions that cause FGAN explosions. The guidance states that only incipient fires in FGAN storage areas (or in vehicles transporting FGAN) should be attacked by using manual fire extinguishing methods that require a human operator.649 Firefighters should withdraw to a safe distance and allow the structural fire to burn to completion once it progresses beyond the incipient stage.650

646 Ibid. 647 NFPA. NFPA 400: Hazardous Materials Code, 2016 Edition. Quincy, MA: NFPA, 2016. 648 Plan approvals are performed by the authority having jurisdiction, such as the fire department or fire marshal. 649 NFPA. NFPA 400: Hazardous Materials Code, Annex E, 2016 Edition. Quincy, MA: NFPA, 2016. 650 NFPA 400 (2016 Edition) states that “responses to incipient releases of hazardous materials where the material can be absorbed, neutralized, or otherwise controlled at the time of release by employees in the immediate release area, or by maintenance personnel, shall not be considered emergency responses as defined within the scope of this code.”

West Fertilizer Company Final Report January 2016 209 U.S. CHEMICAL SAFETY AND HAZARD INVESTIGATION BOARD

Following the WFC incident, the NFPA-sponsored Fire Protection Research Foundation651 (the Foundation) conducted a study652 to determine the adequacy of the separation distances prescribed for hazardous materials in NFPA 400, with a greater focus on FGAN. NFPA 400 specifies separation and clearance distances for newly constructed hazardous chemical storage from other on-site equipment and occupied buildings. The Foundation’s technical committee was made up of industry representatives, and research and engineering organizations that conducted literature reviews of existing methodologies to determine safe separation distances and testing to characterize the effect of AN detonations on personnel and processes near an explosive event. The study included reviews of various sources for risk-based and consequence- based methodologies for determining the safe distances as well as established distance tables. To study the adequacy of the existing separation distances in NFPA 400, the Foundation commissioned explosive testing to characterize the effects of nearby processes and personnel using a 3,000 pound ANFO donor charge to simulate an explosion. As part of the analysis, blast consultants compared the blast pressures and data recorded at various distances from the donor charge and compared the effects to the recommended distances for Class 3 Oxidizers in detached unsprinklered storage prescribed in NFPA 400 Chapter 15 (Oxidizer Solids and Liquids). The study concluded that the process-to-process separation distances for solid AN may be inadequate to provide protection against blast effects, but the process-to-personnel separation distances may be acceptable if personnel are inside buildings located at prescribed distances. However, the study concluded that additional testing and analysis is necessary to validate the absolute safety of personnel based on variations in processes, design, and potential reactants. The purpose of the project was to provide guidance to the NFPA technical committee for the development of technically-based separation distances for storage. Thus, the Foundation recommends a technical- based approach to establish safe separation distances that takes into account the risks associated with a known material and process, as well as the potential consequences of a catastrophic event involving that material. 8.6.2 International Code Council Like the NFPA, the ICC is an international nonprofit organization that develops and publishes consensus codes and standards. In addition to publishing the IFC, the ICC also produces the International Building Code (IBC), which is in use or adopted in 50 states. Jurisdictions can adopt the model codes by reference. The ICC views its codes as “companion” documents that work across disciplines (e.g., building construction, fire protection, mechanical systems, plumbing, zoning). Thus, a regulation for HAZMAT storage will affect building code requirements for construction, mechanical code requirements for

651 The Fire Protection Research Foundation is an affiliate of NFPA and plans, manages, and communicates research on fire safety issues in collaboration with academics, laboratories, and industry. 652 See: http://www.nfpa.org/Assets/files/AboutTheCodes/59A/RFSeparationDistancesNFPACodesAndStandards.pdf (accessed on December 30, 2015).

West Fertilizer Company Final Report January 2016 210 U.S. CHEMICAL SAFETY AND HAZARD INVESTIGATION BOARD

ventilation, plumbing code requirements for drainage, and fire code requirements for operations and handling. The codes are cross-referenced for ease of use. The ICC requirements for protecting AN from fire exposure and explosion are based on material properties, quantities stored, and storage and handling conditions. The ICC defines storage as “the keeping, retention or leaving of hazardous materials in closed containers, tanks, cylinders, or similar vessels; or vessels supplying operations through closed connections to the vessel.”653 Therefore, despite common references to the WFC FGAN as “in storage,” the IFC would interpret this application as “handling,” which it defines as “the deliberate transport by any means to a point of storage or use,” or as “use,” which it defines as “placing a material into action, including solids, liquids and gases.”654 The IFC does not have a separate chapter for AN. The IFC refers to NFPA 400 when AN intended for explosive materials is stored, handled, or used. Otherwise, AN is treated as an oxidizing agent, subject to the general requirements for each oxidizer class in IFC Chapter 63 (Oxidizers, Oxidizing Gases and Oxidizing Cryogenic Fluids) and Chapter 50 (Hazardous Materials). 8.6.3 State Fire Codes Without a comprehensive federal standard, states must rely on their own regulations to oversee HAZMAT storage. Most states have enacted fire codes or have adopted model fire codes. These codes typically include HAZMAT storage and emergency planning provisions. However, at the time of the incident, Texas had no state fire code, and the state still has no such code as of publication of this report. The majority of states have adopted model fire codes through referencing them into law.655 Two recognized model fire codes are the IFC and NFPA 1. Both establish minimum requirements for fire prevention and protection systems. Some states and municipalities have developed their own fire codes, using model codes as a guide. New York City updated its fire code in December 2007, marking its first major revision since 1913.656 After investigating an industrial waste explosion and fire in 2001 in the Chelsea district of Manhattan, CSB issued a recommendation to the Mayor and City Council to better address HAZMAT.657 The city developed its own code, borrowing heavily from the IFC (2003 Edition) but requiring some more stringent provisions. States could potentially apply other IFC chapters for storing bulk FGAN. For example, IFC Chapter 63 (Oxidizers, Oxidizing Gases and Oxidizing Cryogenic Fluids) includes provisions for storage and use of oxidizing materials, such as FGAN. This chapter says that indoor storage of oxidizers should be located in a detached building with an automatic sprinkler system and smoke detection systems. Additional

653 ICC. Chapter 50, Section 5002.1. International Fire Code, 2015 Edition. Washington, DC: ICC, 2015. 654 Ibid. 655 ICC. “International Code Adoption.” International Fire Code. Washington, DC: ICC, 2014. See: http://www.iccsafe.org/gr/Pages/adoptions.aspx (accessed on November 6, 2014). 656 Cassono, Salvatore. “A New Fire Code for New York City.” Building Safety Journal (July–August 2008). 657 CSB. “Chemical Waste-Mixing Incident: Kaltech Industries Group, Inc.” CSB Investigation Report, April 25, 2002.

West Fertilizer Company Final Report January 2016 211 U.S. CHEMICAL SAFETY AND HAZARD INVESTIGATION BOARD

requirements for storage configuration, separation barriers, and explosion control depend on the class of oxidizer, of which the IFC names four. NFPA 1 includes similar requirements for oxidizers in Chapter 70 (Oxidizer Solids and Liquids). This chapter directs users to follow NFPA 400, which also incorporates similar building and fire protection requirements for indoor storage of oxidizers. The WFC did not voluntarily implement any of the provisions from the oxidizer chapters of the IFC or NFPA 1, nor were they required to do so by the authority having jurisdiction. The WFC did not install an automatic sprinkler or smoke detection system in the fertilizer warehouse, nor did it store its FGAN in a separate building, away from combustibles. The location where the fire originated was adjacent to the FGAN bin, and no fire-rated wall separated the rooms. The WFC was not subject to code provisions because none of the relevant jurisdictions—not the state of Texas, McLennan County, or the city of West—had adopted a fire code. Texas affords counties and municipalities the discretion to adopt or develop fire codes. However, state law limits which counties can adopt such codes. Only a county with a population of more than 250,000 (and counties adjacent to a county with a population of more than 250,000) may adopt a fire code. Moreover, even if such a county does adopt a fire code, that code applies only to the unincorporated areas of the county. Cities within the county can adopt the county fire code, not adopt a fire code, or develop their own fire codes. Adoption of a city fire code does not affect any unincorporated areas outside the city. Although many major Texas cities have adopted fire codes, the pattern is inconsistent. As of September 2014, 43 facilities stored FGAN in 36 Texas counties. Only one of those 36 counties has a population of more than 250,000 people,658 and only six of those counties are adjacent to counties with populations that equal or exceed 250,000. Consequently, 79 percent of the 43 FGAN storage facilities are located in Texas jurisdictions that, under state law, cannot adopt a fire code. According to the 2010 census, the population of McLennan County was 241,281. Thus, the county fell below the population threshold. However, one of the seven adjacent counties had a population of more than 250,000. Accordingly, McLennan County had the authority to adopt a fire code, but this was not required. It is also important to note that the WFC facility was only partially within city limits. The fertilizer warehouse was located in an unincorporated area of West. If McLennan County had adopted a fire code, it would have applied to the WFC fertilizer warehouse only. Furthermore, if West had decided to adopt its own fire code, it would have applied to the entire WFC facility except for the warehouse. Although efforts have been made to make a state fire code in Texas mandatory, such endeavors have not been successful. The Texas Legislature debated the issue of adopting a state fire code at least as far back as 1978. Legislative committee reports between 1978 and 1984 from the Texas House of Representatives and the Texas State Senate identified the severe fire problem, and one report contended that the losses from fires exceeded “loss of life and property” from “all natural disasters combined” in the state.659 After

658 U.S. Census Bureau. 2010 U.S. Census. Washington, DC: U.S. Census Bureau, 2011. 659 Texas House of Representatives Committee on Business and Industry. “Interim Report,” October 13, 1978.

West Fertilizer Company Final Report January 2016 212 U.S. CHEMICAL SAFETY AND HAZARD INVESTIGATION BOARD

hearing multiple testimonies in public hearings across the state, a committee report concluded that Texas was “one of the leading states in property loss and lives lost because of fire.”660 This same committee report also found that such major losses occurred not in the most populated municipalities that had adopted fire and building codes, but in the unincorporated areas where fire codes did not apply.661 It stated that unincorporated areas were particularly problematic when annexed into a municipality because the city assumed responsibility for fire-prone buildings that were not built to code specifications.662 Because growth areas in counties are inevitable targets for municipal annexation, if counties are not granted proper regulatory authority, cities inevitably inherit the problems thus created. The Texas legislative committee reports also identified that without a state fire code, the State Fire Marshal cannot fulfill the duty of minimizing fire risks. One report noted that the State Fire Marshal has no authority to adopt a fire code, despite holding responsibility for the inspection of state-owned and state-leased buildings. Without a code, the State Fire Marshal is unable to set criteria to assess a fire hazard and enforce corrective actions. Moreover, although the local fire marshals hold authority to inspect facilities in their jurisdictions, without a fire code, they cannot enforce safety measures that are not legally required. The Texas Fire Protection Standard Committee, a special interim legislative committee, studied the fire problem and issued an interim report to the 69th session of the Texas Legislature in December 1984.663 This committee confirmed many of the findings above.664 In addition, the committee analyzed NFPA national fire data from 1978 to 1982.665 These data indicated that the per capita number of fires, deaths, and injuries and the dollar loss resulting from fire were all lower in states with fire codes than in those without them.666 The data also suggested that education alone to minimize human errors was insufficient to reduce fire loss because fire causation was mostly attributable to improper structural design and equipment malfunction.667 This committee also received extensive testimony from around the state indicating that the loss of life in the volunteer firefighter service was primarily “because there were no codes.”668 Over the years, proposed bills in the Texas Legislature for adoption of a fire code failed to gain support. In 1977, the Texas House of Representatives addressed a proposed bill to enforce a “fire prevention code” that would apply only to unincorporated areas and would be enforced by the state and county fire

660 Texas Senate Subcommittee on Consumer Affairs. “Final Staff Recommendations,” December 1980. 661 Ibid. 662 Ibid. 663 Texas Fire Protection Standards Committee. “Interim Report to the 69th Texas Legislature.” December 1984. 664 Ibid. 665 Ibid. 666 Ibid. It was noted in the report that the fire loss data had limitations because mandatory reporting requirements were not consistent throughout the nation. This limited statistical analysis nonetheless pointed out principal causes of fires. 667 Ibid. 668 Ibid.

West Fertilizer Company Final Report January 2016 213 U.S. CHEMICAL SAFETY AND HAZARD INVESTIGATION BOARD

marshals.669 In 1997, 20 years later, another proposed Texas House bill sought adoption of a code that would apply to (1) buildings located in unincorporated areas that have not adopted a fire code, (2) municipalities that did not adopt a fire code, (3) public assembly buildings in municipalities that have not adopted either model code, and (4) state-owned buildings.670 Neither bill progressed out of committee. In 1989, the Texas Legislature granted limited authority to counties with a population of 250,000 or more to adopt and enforce a fire code.671 This authority was later amended in 1997 to address growing populations and include counties adjacent to those with a population of at least 250,000.672 The failure to mandate a statewide fire code left some counties such as McLennan County without minimum fire protection measures. The absence of a state-wide fire code and the local population restrictions for code adoption remain an important issue for CSB. However, since the WFC incident, Texas has amended the administrative code to provide the State Fire Marshal with greater authority to enforce some NFPA codes at FGAN storage facilities, as well as to enter, upon complaint, and inspect facilities against the provisions of NFPA 1. Though the adoption did not create a state-wide fire code, it allows for the State Fire Marshal to inspect against a more comprehensive standard than NFPA 101 (Life Safety Code) that Texas previously adopted.673 Additional changes to the Texas State Fire Marshal’s authority to inspect FGAN facilities were enacted as part of House Bill 942 (described in Section 8.7.2). In addition, the Texas Agriculture Code was amended to impose additional requirements on FGAN retailers (described in Section 8.7.1). 8.7 Post-Incident State and Local Regulatory Developments Since the 2013 WFC incident, state and local legislators in Texas have attempted to improve FGAN safety through regulatory change. These efforts represent important first steps in recognizing the potential catastrophic hazards of FGAN under certain conditions. However, they are not entirely adequate. For example, when Texas House Bill (HB) 942 became law, it simply codified existing state hazardous chemical reporting requirements. Also, although the revised Texas Commercial Fertilizer Rules establish requirements for FGAN to be separated by at least 30 feet from combustible and flammable materials,674 this requirement is much less restrictive than the newly revised NFPA 400

669 65th Texas Legislative Session. House Bill (HB) 325, “An act relating to the promulgation and enforcement of a state fire prevention code for unincorporated areas of the state by the State Board of Insurance.” 670 75th Texas Legislative Session. HB 2922, “An act relating to a statewide building and fire code.” 671 71st Texas Legislative Session. HB 2252, “An act relating to the authority of the commissioners courts of certain counties to adopt a fire code for certain buildings in unincorporated areas.” 672 75th Texas Legislative Session. State Bill (SB) 10, “An act relating to the authority of certain counties to adopt and enforce a fire code.” 673 See: https://texreg.sos.state.tx.us/public/readtac$ext.TacPage?sl=R&app=9&p_dir=&p_rloc=&p_tloc=&p_ploc=&pg=1 &p_tac=&ti=28&pt=1&ch=34&rl=303 (accessed on December 30, 2015). 674 Texas Administrative Code, Title 4, Chapter 65, Section 65.6(d)(3). See: http://otscweb.tamu.edu/Laws/PDF/CommercialFertilizerRules.pdf (accessed on December 29, 2015).

West Fertilizer Company Final Report January 2016 214 U.S. CHEMICAL SAFETY AND HAZARD INVESTIGATION BOARD

standard and might not fully eliminate the risk of molten FGAN contamination during a fire. This section includes a discussion of the Texas Commercial Fertilizer Rules, a general analysis of HB 942 as well as a comparison of HB 942 to other legislation pending in committee as of this report’s publication date, and a review of an Athens, Texas, ordinance that mandates a ban on the bulk storage of FGAN. 8.7.1 Texas Commercial Fertilizer Rules The Office of the Texas State Chemist (OTSC) regulates the sale of FGAN and FGAN-containing materials. Enacted by 2007 amendments to the Texas Agricultural Code Section 65.6, the law places limits on FGAN sales. It establishes requirements for registration certificates issued by the Texas Feed and Fertilizer Control Service as a condition of selling (or offering to sell) FGAN.675 To reduce theft or terrorism, the requirements focus on security measures for FGAN storage and on recordkeeping to identify people who purchase FGAN. In June 2014, Texas revised the provisions of its Commercial Fertilizer Rules.676 The revised rules require FGAN facilities to file Top-Screen information under the federal CFATS rule as well as EPCRA Tier II information with the Texas Department of State Health Services as a condition for receiving an annual certificate of registration to sell FGAN. The 2014 revisions also require OTSC to inspect FGAN storage areas. Such inspections are to confirm that combustible and flammable materials, such as potential sources of ignition—fuels, oils, hay, or other organic materials—are separated from FGAN by at least 30 feet. If facilities do not comply with these requirements, OTSC can deny, suspend, or revoke annual certificates to sell (or offer to sell) FGAN. 8.7.2 Texas House Bill 942 The summary of Texas HB 942 says that it is an “act relating to the storage of certain hazardous chemicals; transferring enforcement of certain reporting requirements, including the imposition of criminal, civil, and administrative penalties, from the Department of State Health Services to the Texas Commission on Environmental Quality.” It became law on June16, 2015.677 The law bars facilities from storing FGAN with any nonfertilizer materials, requires that FGAN be stored at least 30 feet away from combustible materials, moves FGAN regulation from the Department of State Health Services to the TCEQ, allows the State Fire Marshal to inspect FGAN facilities, gives fire departments access for pre-fire planning assessments, and requires correction of hazardous conditions within 10 days.678 Although this law is an effort by state legislators to better regulate FGAN, it is not entirely adequate. For example, the requirement that FGAN storage be at least 30 feet from combustible materials was already required by the Texas Commercial Fertilizer Rules, as amended in June 2014 (and discussed in Section

675 See: http://www.tlc.state.tx.us/pubssoe/80soe/80soe.pdf (accessed on December 29, 2015). 676 See: http://otscweb.tamu.edu/Risk/AmNitrate/PDF/AN-Compliance-Guide.pdf (accessed on December 29, 2015). 677 Ibid. 678 See: http://kwbu.org/post/abbott-signs-bill-tackles-ammonium-nitrate-storage (accessed on December 29, 2015).

West Fertilizer Company Final Report January 2016 215 U.S. CHEMICAL SAFETY AND HAZARD INVESTIGATION BOARD

  1. 7.1), a year before HB 942 became law. During a May 2015 meeting of the Texas Senate Committee

on Natural Resources and Economic Development, Senator Brian Birdwell, who sponsored the bill, affirmed this fact. He said, “To be clear this is not a new regulatory scheme. HB 942 simply codifies existing regulations regarding reporting of hazardous chemicals. These are existing regulations which 100 percent of FGAN storage facilities in this state [must currently comply with].”679 A related bill, HB 417, would impose penalties for improper FGAN storage and would create rulemaking authority over FGAN facilities.680 The bill states, “The commissioner of insurance, after consultation with the state fire marshal, by rule shall adopt fire protection standards for FGAN storage facilities, including standards for the storage of FGAN at those facilities.”681 State Representative Joe Pickett, the author of HB 417, told the Texas House Committee on Environmental Regulation in April 2015 that “the rulemaking authority is a way to make changes without the Legislature being in session,” explaining that the Commissioner of Insurance would work with state agencies.682 This regulatory authority distinguishes HB 417 from HB 942. Although HB 417 does not necessarily establish new regulations, it gives the Commissioner of Insurance an opportunity to do so. As of December 2015, however, this bill remains pending in committee.683 8.7.3 Athens City Ordinance After the May 29, 2014, FGAN-related fire at the East Texas Ag Supply facility in Athens, Texas (discussed in Section 7.4), the city of Athens initiated efforts to prevent similar events. On May 29, 2015, Athens passed an ordinance that banned bulk storage of FGAN and anhydrous ammonia.684 The ordinance (No. O-24-14) states in simple terms, “Commercial Fertilizer Storage or Manufacturing Facilities used to produce, transfer, store, or offer for sale Bulk FGAN, Bulk FGAN Material and/or Anhydrous Ammonia shall not be allowed in any zoning district in the City.” A “commercial fertilizer storage or manufacturing facility” is defined as one that “stores, mixes, or manufactures 10,000 or more pounds of FGAN and/or anhydrous ammonia and/or is required to register with the Texas Feed and Fertilizer Control Service.” The ordinance also streamlines chemical reporting and allows volunteer fire departments to inspect facilities.685 However, this ordinance does not apply retroactively to the facilities that existed when the ordinance was enacted.

679 Ibid. 680 See: http://www.texastribune.org/2015/04/07/proposed-bill-aims-prevent-another-fertilizer-blas/ (accessed on December 29, 2015). 681 Texas HB 417, “An act relating to information regarding the storage of certain hazardous chemicals; providing penalties.” 682 See: http://www.texastribune.org/2015/04/07/proposed-bill-aims-prevent-another-fertilizer-blas/ (accessed on December 29, 2015). 683 See: http://txlege.texastribune.org/84/bills/HB417/ (accessed on December 29, 2015). 684 See: http://www.kltv.com/story/29192400/one-year-after-fire-city-of-athens-state-make-changes-in-ammonium- nitrate-storage (accessed on December 29, 2015). 685 Ibid.

West Fertilizer Company Final Report January 2016 216 U.S. CHEMICAL SAFETY AND HAZARD INVESTIGATION BOARD

  1. 8 Industry Standards

Since the WFC incident, the fertilizer industry has implemented initiatives to prevent such an incident from reoccurring. In February 2014, TFI and the ARA, two primary agricultural trade associations, developed and issued Safety and Security Guidelines for the Storage and Transportation of Fertilizer Grade Ammonium Nitrate at Fertilizer Retail Facilities (or Safety and Security Guidelines).686 This public document explains the OSHA Explosives and Blasting Agents standard, but also provides more specific guidance. In March 2014, TFI and the ARA initiated an FGAN stewardship program. Participation involves a voluntary assessment every three years of facility safety and security, focusing on FGAN and anhydrous ammonia. 8.8.1 The Fertilizer Institute (TFI) TFI is a major trade association for the fertilizer industry.687 TFI members include BP Energy Company, Dow AgroSciences, DuPont Sulfur Products, JP Morgan, Mitsubishi International Corporation, Shell Sulphur Solutions, and Union Pacific Railroad.688 TFI lists security, energy, the environment, and worker health and safety as concerns to its members.689 It also lists product safety stewardship as one of its key issues.690 TFI offers tools to enhance the safety and security of products and equipment (discussed in Appendix E) across the supply chain.691 Post-WFC incident tools include the Compliance Assessment Tool, the Safety and Security Guidelines, and the ResponsibleAg program. Each of these is discussed in the next sections. 8.8.1.1 Compliance Assessment Tool The Asmark Institute, a private not-for-profit educational organization that is a resource center for the agricultural retail industry, developed the web-based Compliance Assessment Tool.692 With regulatory compliance consistently cited during the last 18 years as one of the top 10 threats to the long-term viability of agricultural retail facilities, the Compliance Assessment Tool is meant to assist the agricultural retail industry.693 This tool helps personnel at facilities, terminals, warehouses, and farm equipment dealers in identifying the regulations that apply to their specific sites. 694 The Compliance Assessment Tool evaluates onsite compliance efforts.695 Through accessing the website, entering facility

686 ARA, TFI. “Safety and Security Guidelines for the Storage and Transportation of Fertilizer Grade Ammonium Nitrate at Fertilizer Retail Facilities,” February 2014. 687 See: http://www.tfi.org/about (accessed on December 29, 2015). 688 See: http://www.tfi.org/about/membership-list (accessed on December 29, 2015). 689 See: http://www.tfi.org/about (accessed on December 29, 2015). 690 See: https://www.tfi.org/advocacy/stewardship (accessed on December 29, 2015). 691 See: http://www.tfi.org/safety-and-security-tools (accessed on December 29, 2015). 692 See: http://www.tfi.org/compliance-assessment-tool (accessed on December 29, 2015). 693 See: https://www.asmark.org/Compass/ComplianceAssessmentTool/ (accessed on December 29, 2015). 694 Ibid. 695 Ibid.

West Fertilizer Company Final Report January 2016 217 U.S. CHEMICAL SAFETY AND HAZARD INVESTIGATION BOARD

information, and describing scope of operations, the user can download a specific compliance assessment document and then complete a worksheet.696 Periodic use of the tool is encouraged to help control risk and to support compliance efforts.697 8.8.1.2 Safety and Security Guidelines for the Storage and Transportation of FGAN at Fertilizer Retail Facilities TFI and the ARA created the Safety and Security Guidelines.698 TFI’s website notes that “the document was created to fill the void in emergency response guidelines specific to FGAN fertilizer at retail fertilizer facilities.”699 The guidelines outline best practices for safe and secure storage and transport of FGAN.700 They also summarize storage and handling regulations for FGAN facilities as well as recommendations for first responders.701 Moreover, they provide rules for transporting FGAN via truck, highway, rail, and barge.702 8.8.1.3 ResponsibleAg Created by TFI and the ARA in 2014, ResponsibleAg is a third-party auditing program for fertilizer retailers.703 Although any business that stores or handles fertilizer product is eligible to participate in the ResponsibleAg Certification Program, the first three years of the program focus on companies that store and handle AN and/or anhydrous ammonia fertilizer.704 Using federal requirements for the storage and handling of fertilizer products, ResponsibleAg has compiled a checklist of more than 320 questions for auditing each participating facility.705 The participating facility determines the audit scope; however, all participants must have a “base audit.”706 A participating facility may become ResponsibleAg certified only if it passes the initial audit or if it takes all necessary steps to correct the issues identified during the audit and documented in the facility’s corrective action plan.707 ResponsibleAg also allows its participating suppliers to access the list of participating facilities that have successfully completed the assessment and earned certification.708 This is important because it allows suppliers to determine whether prospective buyers have successfully completed the ResponsibleAg assessment, which thereby promoted federal regulatory compliance. This approach enables

696 Ibid. 697 Ibid. 698 See: http://www.tfi.org/ammonium_nitrate_guidelines (accessed on December 29, 2015). 699 Ibid. 700 Ibid. 701 Ibid. 702 Ibid. 703 Ibid. 704 See: http://www.responsibleag.org/About.cgi (accessed on December 29, 2015). 705 Ibid. 706 Ibid. 707 These corrective actions must be certified by ResponsibleAg, usually during a verification audit. 708 See: https://www.responsibleag.org/FAQ.cgi#Link02 (accessed on December 29, 2015).

West Fertilizer Company Final Report January 2016 218 U.S. CHEMICAL SAFETY AND HAZARD INVESTIGATION BOARD

ResponsibleAg members to engage in some elements of product stewardship (as discussed in Section 8.8.3). Notably, CF Industries and EDC, the only AN fertilizer manufacturers in the United States, are listed as ResponsibleAg participants.709 Appendix F includes additional information on the ResponsibleAg program process. 8.8.2 Agricultural Retailers Association (ARA) The ARA is also a major trade association for the fertilizer industry.710 It represents agricultural retailers and distributors across the United States on legislative and regulatory issues.711 ARA members represent the majority of agribusinesses in the United States.712 The ARA works with Congress to create legislation, and updates federal agencies and legislators on important issues affecting the industry.713 The ARA offers programs and services to keep its members informed of important industry issues.714 8.8.3 Product Stewardship As of this report’s publication, only two companies in the United States, CF Industries and EDC, manufacture FGAN.715 Fertilizer manufacturers can promote the safe storage and handling of FGAN by distributors and retailers by implementing product stewardship programs. According to the Center for Chemical Process Safety, product stewardship encourages safety and health in the design, manufacture, marketing, distribution, handling, use, and disposal of chemical products.716 Responsibility for safely managing the product is shared throughout the supply chain and the product life cycle. Because it is a self-regulated program, product stewardship can only be as effective as industry intends and allows. CSB determined that components of an effective product stewardship program should generally include the following elements for each product: • Identifying and communicating all product hazards among manufacturers, distributors, and retailers. • Providing supplemental technical information on safe handling practices for the product (furnished by manufacturers and/or distributors) to other distributors and/or retailers. • Establishing accountability for distributors and retailers to promote safe handling of a product throughout the chain of customers. • Performing monitoring and auditing, such as onsite visits to the locations where the product will be stored or used.

709 See: https://www.responsibleag.org/ParticipantList.cgi (accessed on December 29, 2015). 710 See: http://www.aradc.org/ARADC/About/About/ (accessed on December 29, 2015). 711 See: http://www.aradc.org/becomeamember/ (accessed on December 29, 2015). 712 Ibid. 713 Ibid. 714 See: http://www.aradc.org/about/about (accessed on December 29, 2015). 715 The WFC also reported receiving imported AN from foreign manufacturers between 2006 and 2013. 716 Center for Chemical Process Safety. Guidelines for Safe Handling of Powders and Bulk Solids. New York: Center for Chemical Process Safety/AIChE, 2005: 521.

West Fertilizer Company Final Report January 2016 219 U.S. CHEMICAL SAFETY AND HAZARD INVESTIGATION BOARD

• Developing mechanisms for outreach to communities near the facilities where the products are stored or used. Information sharing is an important component of product stewardship. When information about product hazards or details about the storage practices of a certain facility are known, people and companies dealing with the product or with the facility have the opportunity to effectively manage the risks associated with that product. The same logic applies to the management of FGAN. The WFC incident highlighted the need for greater awareness of the unpredictable nature of AN and the conditions under which it can detonate. Two industry programs, Responsible Care and ResponsibleAg, both advocate information sharing. Accordingly, the programs have serious product stewardship potential. As described in Section 8.8.1.3, the joint TFI-ARA ResponsibleAg program currently addresses some aspects of product stewardship. In particular, fertilizer sellers (i.e., manufacturers and/or distributors) may elect to access the list of ResponsibleAg-participating facilities to determine assessment completion and certification of prospective buyers (i.e., distributors and/or retailers). By doing so, the seller verifies that the buyer safely stores fertilizer (or at least has a record of safely storing fertilizer). Similarly, the American Chemistry Council’s (ACC) Responsible Care initiative includes information sharing in its product stewardship program. Participation in Responsible Care is a condition of membership for ACC members.717 The program specifies 11 management practices and focuses on leadership commitment, accountability and management, prioritization of products, product information, risk characterization, management of new information, product safety management, product design and improvement, value chain communication, cooperation and outreach, information sharing, and performance assessment and continual improvement.718 Serious participation in product stewardship programs such as ResponsibleAg and Responsible Care can promote the safe handling and storage of domestically manufactured FGAN. This is especially true for FGAN because there are only two companies, CF Industries and EDC, that manufacture FGAN in the United States. As such, domestically manufactured FGAN product can be linked to one of these two companies. CF Industries and EDC are already members of ResponsibleAg. Product stewardship programs such as ResponsibleAg can ensure that FGAN management practices, starting with FGAN manufacturers CF Industries and EDC, are subject to greater scrutiny. However, it is also important to make sure that distributors and retailers handle and store the product safely. Because responsibility for a chemical product does not always end after it is manufactured, it is important that manufacturing companies know how the product is handled and stored once it leaves the production site. In other words, a manufacturer cannot simply confirm that its direct buyer safely stores and handles the manufacturer’s product because that buyer may in turn sell to another buyer that does not store or handle the product safely. The same reasoning applies to communicating product hazards. Of course, requiring the manufacturer to communicate the hazards of its product to its buyer is surely a step in the

717 See: http://responsiblecare.americanchemistry.com/ (accessed on November 30, 2015). 718 See: http://responsiblecare.americanchemistry.com/Responsible-Care-Program-Elements/Product-Safety- Code/Responsible-Care-Product-Safety-Code-PDF.pdf (accessed on November 30, 2015).

West Fertilizer Company Final Report January 2016 220 U.S. CHEMICAL SAFETY AND HAZARD INVESTIGATION BOARD

right direction, but the buyer must also communicate the same hazards to its buyers, if any. Otherwise, catastrophic incidents can occur. Importantly, therefore, these distribution chains must not break; effective communication must endure from top to bottom. To ensure continuity of communication throughout the supply chain, industry should voluntarily take an active role. Because government agencies cannot reasonably be expected to routinely inspect every FGAN facility, industry’s product stewardship programs must play a significant role in making sure that this top-to-bottom approach is implemented. Product stewardship offers an important opportunity for industry to further manage risk, beyond providing SDSs to retailers. Although CF Industries and EDC use different business models, both have executed initiatives that ascribe to product stewardship elements post-incident. 8.8.4 Efforts to Address FGAN Hazards Post-Incident Since the WFC incident, both CF Industries and EDC have made additional efforts to make sure that their FGAN product is stored and handled safely as it moves out of their manufacturing facilities. CF Industries has implemented a certification process for its customers (purchasing organizations as well as facilities that receive FGAN deliveries) to confirm that customers communicate both the hazards and safe storage and handling practices of FGAN. As of December 31, 2014, CF Industries requires existing facilities to certify through a signed certification letter that they are in compliance with applicable guidelines and regulations before they can receive FGAN product. All new purchasing organizations and sites must also return the signed certification letter before receiving FGAN from CF Industries. Specifically, the letter requires senior responsible officials at both the purchasing organization and the delivery facility to certify that they are either in compliance with, or legally exempt from, 17 items. These items include, for example, attestations that: • The purchasing organization provided the FGAN SDS developed by CF Industries to all of its sites. • The purchasing organization and site provided copies of the CF Industries FGAN SDS to all employees. • The site complies with OSHA requirements for FGAN storage. • The site filed EPCRA and SARA Tier II Chemical Inventory Reports with appropriate emergency response organizations. • The site maintains and follows an emergency response plan and written procedures for the safe handling of AN. By signing the certification statement, officials at the purchasing organization certify that all relevant personnel at the site are aware of FGAN safety handling requirements and that adequate procedures are in place to comply with all 17 listed items. The certification packet also includes an up-to-date FGAN SDS developed by CF Industries and the TFI-ARA guidance for FGAN. CSB determined that this process could provide a reasonable degree of assurance that FGAN product hazards are being communicated as the product is delivered to new and existing customers and, most important, that those customers comply

West Fertilizer Company Final Report January 2016 221 U.S. CHEMICAL SAFETY AND HAZARD INVESTIGATION BOARD

with applicable regulations and practices in order to receive product. If CF Industries does not receive a completed and signed certification statement, it will not sell FGAN product. Although not in the form of a certification statement program, EDC also took steps to enhance the safety of its FGAN product post-incident. EDC updated its SDS for FGAN to include more information regarding firefighter precautions and added a reference to NFPA 400.719 Moreover, EDC developed a product information bulletin to accompany its SDS to emphasize FGAN hazards and safety measures.720 To better communicate FGAN hazards in response to the WFC incident, EDC conducted mass mailings to all of its customers. The mailings included the following: • EDC’s revised SDS (September 2013 and November 2014 versions). • TFI-ARA Safety and Security Guidelines for Ammonium Nitrate. • OSHA Guidance on Ammonium Nitrate Storage Requirements in 29 CFR 1910.109(i). In addition, EDC repaired and replaced wooden bins at its own owned-and-operated retail site locations to ensure compliance with OSHA requirements regarding the protection of bins against AN impregnation. In gathering information regarding these post-incident safety initiatives, CSB found that CF Industries and EDC operate under different business models, despite their status as the only two manufacturers of FGAN in the United States. CF Industries does not directly sell to retailers, but may deliver directly to retailers at the instruction of a direct customer. It delivers FGAN only to independently owned and operated distributors or their retail customers. CF Industries does not own any of the distribution facilities to which it ships product, and it does not sell directly to retailers, although it might deliver directly to retailers at the instruction of a direct customer. Unlike CF Industries, EDC delivers some FGAN product to its own owned-and-operated distribution sites. In this regard, the business models of CF Industries and EDC differ. EDC produces FGAN in El Dorado, Arkansas, which is shipped by rail or truck to either (1) its own distribution sites, which operate under the name EDC Ag Products Company, LLC (EDC Ag Products),721 or (2) its larger customers. Approximately 40 percent of the FGAN produced at the EDC Arkansas manufacturing facility is shipped to its 11 EDC Ag Products distributor locations (most in Texas), and approximately 60 percent is sold directly to customers. From the EDC Ag Products distributor locations, FGAN may be sold to other distributors or to retailers or farmers. All of the FGAN sold directly from the EDC manufacturing facility in Arkansas is delivered mainly to dealers, with a small quantity to brokers.

719 See: http://eldoradochemical.com/MSDS_Sheets/EDC/EDC_Products/EDCC_AN_Prill_SDS_Information_Bulletin_No v_2014.pdf (accessed December 29, 2015). 720 Ibid. 721 At the time of the incident, the distribution sites operated under the name El Dorado Chemical. El Dorado Chemical Company and EDC Ag Products Company, LLC are subsidiaries of LSB Industries, a manufacturing and marketing company.

West Fertilizer Company Final Report January 2016 222 U.S. CHEMICAL SAFETY AND HAZARD INVESTIGATION BOARD

At the time of the WFC incident and as long ago as 2004, EDC sold products to International Chemical Company (Inter-Chem), which acted as a trader or supplier of FGAN, among other fertilizer products. Through its Domestic Plant Foods Group, Inter-Chem is a distributor of phosphate, nitrogen, and potash products in the United States.722 Essentially, Inter-Chem served as a broker and consignee of finished fertilizer products to the WFC. Although Inter-Chem did not produce or manufacture the fertilizer product that was sold to the WFC, its role as a broker was significant. Importantly, Inter-Chem functioned as another link in the chain of commerce as the FGAN traveled from manufacturer to retailer through the broker. To better understand the chain of hazard communication involved in this investigation, CSB started at the top with the manufacturers and analyzed the pre-incident SDSs and hazard communication practices of both EDC and CF Industries. Before the WFC incident, EDC provided a copy of its SDS to its customers and to Inter-Chem. The EDC SDS in use at the time of the 2013 WFC incident was last revised in 2011. CSB reviewed the SDS and found that it lacked certain safety information, specifically related to firefighting measures. The 2011 EDC SDS included warnings about the hazards of AN, such as its capability to support combustion and become explosive in the presence of contaminants or when under confinement. Under the firefighting measures section, the SDS instructed firefighters to “flood with water” but did not address the proper way to handle massive and uncontrollable fires, the need to extinguish such fires from a distance, or the possible need for evacuation. In addition, the SDS lacked references to applicable AN safety standards, such as the OSHA Explosives and Blasting Agents standard and NFPA 400 (2010 Edition). On the other hand, the CF Industries pre-incident SDS included a comprehensive list of AN hazards and firefighting measures. Nonetheless, both CF Industries and EDC made changes to enhance the safe handling of their products after the WFC incident. As previously discussed, both U.S. FGAN manufacturers have improved communications with their customers about FGAN hazards and safe storage practices since the WFC incident. CF Industries implemented a program to certify compliance with applicable standards and guidelines as a condition of sale. In contrast, EDC conducted hazard communication in the form of mass mailings, replaced and repaired its own wooden bins at EDC Ag Products facilities, and continues to audit and inspect its retail sites (which it can readily do because EDC owns and operates these retail divisions) to make sure that about 40 percent of its manufactured FGAN is stored in compliance with applicable standards. These efforts represent a step in the right direction. However, because both EDC and CF Industries sell significant quantities of FGAN through brokers or through independent warehouses or distributors, whose direct customers may be unknown to EDC and CF Industries, it might not be possible in certain situations for the manufacturers to always ensure that their product is handled and stored in accordance with safety guidelines as the product moves downstream. At the very least, however, the certification statement program implemented by CF Industries attempts to ensure compliance with applicable regulations by causing its customers to attest to having knowledge of them.

722 See: http://www.ictulsa.com/domestic_fert.html (accessed on December 29, 2015).

West Fertilizer Company Final Report January 2016 223 U.S. CHEMICAL SAFETY AND HAZARD INVESTIGATION BOARD

As previously discussed, the CF Industries certification program strives to certify compliance by requiring purchasing organizations to affirm that their customers are in compliance with the CF Industries certification program elements. CSB found no evidence of such a program at EDC. Because EDC also sells product through wholesalers and distributors, a similar certification program, if implemented properly in conjunction with other components of product stewardship, will ensure that EDC product is handled safely throughout by its chain of customers. In concert with CF Industries’ efforts, this can effectively promote the safety of all domestically manufactured FGAN. 9.0 Land Use The West Fertilizer Company (WFC) incident led many observers to ask a seemingly simple question: Why would a community be located so close to a facility storing a potentially dangerous chemical? Although the question might be simple, the answer is not. In fact, the city of West, Texas, was so near the WFC facility primarily because of the following factors: • The city “came to” the WFC facility over the years. • There was a lack of zoning regulations. These factors are interrelated. The growth of the community near the WFC facility made it difficult for the city to later enact zoning regulations to require risk mitigating actions such as a buffer zone between the facility and the community. This is not to say that West is an anomaly. Many communities in Texas and nationwide are located too close to facilities resembling the WFC plant.723 This reality highlights the need to explore why communities live with these hazards so that authorities can better mitigate the offsite consequences from incidents such as the fire and explosion at the WFC plant in West. In this section, CSB seeks to explain the previously mentioned factors, providing insights into the proximity of the WFC facility to the West community. Following that discussion, other CSB investigations involving offsite consequences are highlighted to emphasize the scope of the problem. International land use perspectives also are provided to compare various approaches to the issue. In addition, efforts to address land use planning after the WFC incident are discussed. 9.1 Land Use Planning: An Introduction Land use planning is a complex and controversial topic. It provides a framework for limiting private land use when necessary for the public benefit. However, economic, social, safety, and environmental interests must be effectively balanced to achieve this benefit. Such competing interests generate highly emotional and contentious debates. Ultimately, however, the decision is political in nature. The community must decide on the best use of land for its development and growth. Urban sprawl,

723 As of December 6, 2013, Texas had 104 facilities storing 10,000 pounds or more of FGAN.

West Fertilizer Company Final Report January 2016 224 U.S. CHEMICAL SAFETY AND HAZARD INVESTIGATION BOARD

environmental concerns, and hazardous conditions are just some of the issues that land use planning addresses. The United States takes a decentralized approach to land use planning; that is, states are largely vested with the authority to regulate and enforce the private use of land. In turn, the states delegate this authority to local governments. This approach generally results in municipalities establishing land use regulations for various areas within their respective jurisdictions. The federal or state government has asserted authority in some areas of land use planning, but the majority of land use planning authority in the United States lies with local governments. The benefits of such an approach stem from the regulatory flexibility to address issues of land use. The judiciary resolves any potential conflicts. Land use planning cannot be said to solve all developmental issues that a community encounters. Land use regulation does give the community a control mechanism to reduce the consequences of an incident but does not eliminate the need for preventive controls. Rather, the mitigative control of land use planning must be combined with preventive controls employed by a variety of different stakeholders. Land use planning is a critical control to foster community development, but it must be integrated with other complementary approaches. At its heart, land use planning offers the means for dealing with development and growth. However, many interests must be taken into account when attempting to effectively ensure a safe and satisfying community. Land use planning considerations can offer insights into the issues evident in the WFC incident. The location of the city of West near the WFC facility produced numerous benefits for the community; however, as the WFC fire and explosion revealed, such siting also had deadly consequences. 9.2 The City That “Came to” the WFC Over the Years The WFC facilities were constructed and began operations in 1962.724 At the time, the facilities were largely surrounded by open fields, raising little concern about any potential offsite consequences. Furthermore, no zoning regulations existed when the WFC began business.725 Over the years, however, the city of West began to slowly develop around the WFC property. As the WFC was grandfathered into West ordinances and the city was subsequently zoned residential, little attention was paid to the city’s slow but steady encroachment toward the WFC facility.

724 Crain, Zac. “Love and Loss in a Small Texas Town.” D Magazine (July 2013). See: http://www.dmagazine.com/Home/D_Magazine/2013/July/West_Texas_Love_and_Loss_in_a_Small_Town.aspx?p age=1 (accessed on November 25, 2014). 725 According to the West Code of Ordinances, the earliest zoning regulation was adopted on March 21, 1967. City of West. Chapter 14, Section 14.01.001. Code of Ordinances. See: http://z2codes.franklinlegal.net/franklin/Z2Browser2.html?showset=westset (accessed on November 25, 2014).

West Fertilizer Company Final Report January 2016 225 U.S. CHEMICAL SAFETY AND HAZARD INVESTIGATION BOARD

West was officially incorporated as a city in 1892, and with the help of a railroad track and fertile land for farming, it thrived.726 Before construction of the WFC plant, the area north of the city was largely open fields used for agriculture and ranching. At the time that the WFC began operations, the area maintained the same character except for a residence located approximately 250 feet north of the WFC property line.727 The location was ideal for such a business—just outside of the city, next to a railroad track, and within a convenient distance for local farmers. West lacked zoning regulations when the WFC completed its construction, and there appeared to be little need for such regulations as the WFC facilities were far removed from the city. Furthermore, the portion of the WFC property where fertilizers and pesticides were stored was outside of the West city limits and thus outside of its jurisdiction.728 Within this framework, the city of West began to expand and grow around the WFC facility. As shown in Figure 74, the city began developing further north over the years. This growth continued until the community was adjacent to the WFC property. Parks, subdivisions, nursing homes, schools, and an apartment complex sat within a 600-foot radius of the facilities. Furthermore, as the city continued to build its infrastructure near the WFC facility, the area became an even more attractive target for development. The community hardly noticed the WFC facility. It was only aware of the risk of accidental releases of anhydrous ammonia but viewed such events with little concern. Figure 75 shows the WFC facility before and after the incident.

726 City of West. “City of West, Our History.” See: http://www.cityofwest.com/our-history (accessed on November 25, 2014). 727 Determined by using the December 14, 1964, aerial photograph of West, Texas, and employing Google Earth. 728 McLennan CAD. “Property Search Results: Property ID 2013357, Adair Grain, Inc. for Year 2013.” See: https://propaccess.trueautomation.com/Map/View/Map/20/201357/2013 (accessed on December 28, 2015).

West Fertilizer Company Final Report January 2016 226 U.S. CHEMICAL SAFETY AND HAZARD INVESTIGATION BOARD

Figure 74. Progressive Development of West (Source: GeoSearch)

West Fertilizer Company Final Report January 2016 227 U.S. CHEMICAL SAFETY AND HAZARD INVESTIGATION BOARD

Figure 75. Aerial Photographs of the WFC Facility Before (left) and After (right) the Incident (Source: NBC News) This lack of proper foresight played a significant role in explaining why West came to be located so close to the WFC plant. Unfortunately, as the WFC was grandfathered into the city’s Code of Ordinances,729 the city was not required to address the risks involved in this encroachment. Not that West is a peculiar case; in many instances across the country, similar problems exist.730 9.3 Lack of Zoning Regulations Both the federal government and Texas have failed to issue regulations relating to siting facilities that store and distribute FGAN near communities such as West. If a regulation had addressed issues such as buffer zones, barricades, or other techniques to mitigate consequences, the severity of the casualties and damage experienced in West could have been significantly reduced. Moreover, although regulation cannot solve all problems, it serves as a mechanism to compel all industries to adopt and implement safer operations. Ultimately, the failure to mitigate the consequences of incidents such as the WFC fire and explosion in West exists at all levels of government. U.S. law largely assigns the authority to regulate private land use to the individual states.731 In turn, the states generally assign this authority to individual municipalities. It is important to note, however, that

729 City of West. Chapter 14. Code of Ordinances. See: http://z2codes.franklinlegal.net/franklin/Z2Browser2.html?showset=westset (accessed on November 25, 2014). 730 For example, CSB reports on NDK, DPC, Concept Sciences, and the Caribbean Petroleum Refining tank explosion and fire. 731 Because the Federal government is only vested with the powers delegated to it through the Constitution—such as the power to regulate interstate commerce, coin money, and so forth—it is limited in its capability to regulate issues

West Fertilizer Company Final Report January 2016 228 U.S. CHEMICAL SAFETY AND HAZARD INVESTIGATION BOARD

the state’s authority can be preempted by the federal government in certain instances, and two of the main instances are matters concerning interstate commerce732 and international treaties.733 This dual sovereignty can allow for greater flexibility in resolving land use issues that affect the public. Over time, the federal government has assumed an increasing role in the regulation of land use issues, including those relating to storing chemicals such as FGAN. ATF, the U.S. Department of Housing and Urban Development (HUD), the Pipeline and Hazardous Materials Safety Administration (PHMSA), OSHA, and EPA have all promulgated regulations or recommendations relating to the siting of explosives, reactives, oxidizers such as FGAN, and flammable cryogenics such as liquefied natural gas (LNG) near populated areas. Table 14 briefly lists the relevant regulations issued by these agencies. Table 14. Relevant Siting Regulations Agency Regulation CFR ATF Commerce in Explosives 27 CFR Part 555 DOT Liquefied Natural Gas Facilities: Federal Safety Standards 49 CFR Part 193 HUD Environmental Criteria and Standards 24 CFR Part 51 OSHA Occupational Safety and Health Standards 29 CFR Part 1910 EPA Chemical Accident Prevention Provisions 40 CFR Part 68 Standards for Owners and Operators of Hazardous Waste Treatment, Storage, and Disposal Facilities 40 CFR Part 264

ATF holds the authority to require setting off stored explosive materials and low-explosive materials from inhabited buildings, public highways, public railways, and magazines.734 Although explosive grades of FGAN are currently listed as explosive materials, the FGAN stored at the WFC facility is not categorized as an explosive material or a low-explosive735 material.736 Therefore, WFC storage of FGAN was not

related to land use. See: 10th Amendment, U.S. Constitution. However, state zoning regulations are subject to Federal preemption in areas where the use of land affects interstate commerce, international treaties, and Federal government spending powers. 732 U.S. Constitution, Article I, Section 8. 733 U.S. Constitution, Article VI. 734 27 CFR 555.218–219: “Explosive materials” are defined as explosives, blasting agents, water gels, and detonators. 27 CFR 555.11: “Explosives” are defined as any chemical compound, mixture, or device, the primary or common purpose of which is to function by explosion. 735 Low explosives are defined as “explosive materials which can be caused to deflagrate when confined. See: http://www.gpo.gov/fdsys/pkg/FR-2012-09-20/pdf/2012-23241.pdf (accessed on December 29, 2015). 736 See: http://www.gpo.gov/fdsys/pkg/FR-2012-09-20/pdf/2012-23241.pdf (accessed on December 28, 2015). See also: 27 CFR 555.220 Note (1), which states: “FGAN, by itself, is not considered to be a [explosive or blasting

West Fertilizer Company Final Report January 2016 229 U.S. CHEMICAL SAFETY AND HAZARD INVESTIGATION BOARD

subject to ATF set-off distances.737 However, ATF has the authority to require a minimum separation distance between the FGAN stored at the WFC facility and certain blasting agents.738 DOT received Congressional authorization to “prescribe minimum safety standards for deciding on the location of a new liquefied natural gas [LNG] pipeline facility,” which it oversees through PHMSA.739 In turn, PHMSA has promulgated a series of recommendations concerning siting requirements for LNG facilities.740 The regulations are based on NFPA 59A concerning the production, storage, and handling of LNG.741 The siting requirements address issues such as thermal radiation protection, flammable vapor- gas dispersion protection, and wind forces. PHMSA applies the regulations to LNG facilities “designed, constructed, replaced, relocated or significantly altered after March 31, 2000,” thereby grandfathering LNG facilities that existed before the March 31 date.742 However, PHMSA has no regulations concerning the siting of AN facilities. HUD requires projects receiving its assistance to be separated by an acceptable distance from specific stationary hazardous operations that store, handle, or process hazardous substances.743 Hazardous substances are defined as “petroleum products (petrochemicals)” and other hazardous chemicals identified by HUD that can produce blast overpressure or thermal radiation levels in excess of HUD standards.744 FGAN is not identified as a hazardous substance for the purposes of this standard.745 In addition, the city of West would not qualify for HUD assistance as it does not meet HUD eligibility requirements.746

agent].” See also: 72 Federal Register 18792, 18796, which states: “[A]lthough FGAN is a component of certain explosives such as ANFO, by itself, it is not an explosive. Therefore, it is not regulated by these ATF regulations.” 737 The purpose behind regulating the siting of ANFO was “to protect interstate and foreign commerce against interference and interruption by reducing the hazard to persons and property arising from misuse and unsafe or insecure storage of explosive materials.” Section 1101, Public Law 91-452, reprinted in: U.S. Code Congressional and Administrative News 1109 (1970). 738 27 CFR 555.220. 739 49 U.S.C. § 60103 (2014). 740 49 CFR 193 Subpart B (2014). 741 65 CFR 10950 (2000) and 69 Federal Register 11330 (2004). 742 49 CFR § 193.2051(2014). 743 24 CFR Subpart C; specifically 24 CFR 51.204 and 24 CFR 51.205. See: http://portal.hud.gov/hudportal/HUD?src=/program_offices/comm_planning/environment/training/guidebooks/hazfa cilities (accessed on December 28, 2015). The intent in creating these regulations was “to encourage improvements in housing standards and conditions.” “The National Housing Act.” See: http://portal.hud.gov/hudportal/documents/huddoc?id=HUD-Guidebook.pdf (accessed on December 28, 2015): 3–4. 744 24 CFR 51.201, 203. 745 24 CFR Part 51, Appendix I to Subpart C. Anhydrous ammonia is also not listed as a hazardous substance; however, under special circumstances, the Secretary may require the application of a substance not listed in Appendix I to Subpart C. See: 24 CFR 51.207 (2014). 746 See: http://portal.hud.gov/hudportal/HUD?src=/program_offices/comm_planning/communitydevelopment/programs/entit lement (accessed on December 28, 2015). Eligible HUD grantees include (1) principal cities of metropolitan statistical areas, (2) other metropolitan cities with populations of at least 50,000, and (3) qualified urban counties with populations of at least 200,000 (excluding the population of entitled cities).

West Fertilizer Company Final Report January 2016 230 U.S. CHEMICAL SAFETY AND HAZARD INVESTIGATION BOARD

OSHA requires facilities handling highly hazardous chemicals to address facility siting issues; however, the requirement only deals with onsite consequences, not the issue of siting communities near highly hazardous chemical facilities.747 This requirement is part of the Process Safety Management (PSM) regulation, which seeks to prevent or minimize the consequences of catastrophic releases of “highly hazardous chemicals.”748 However, the PSM regulation does not include FGAN as a highly hazardous chemical.749 In addition, OSHA has the authority to require separation distances between FGAN and blasting agents,750 in the same manner as ATF.751 The federal agency concerned with offsite consequences, EPA, addresses the siting of hazardous facilities near population centers by issuing various regulations and guidance.752 For example, EPA regulates facility siting through its Risk Management Program rule, which calls on operators to address “stationary source siting” in its Program Level 3 process hazard analysis.753 However, EPA offers little to no guidance to operators on how to satisfy the “stationary source siting” requirement.754 The Risk Management Program rule also requires operators to conduct an offsite consequence analysis to provide government officials and the public with information about the potential consequences of an accidental release.755 However, as FGAN is not classified as a hazardous regulated substance under the Risk Management Program rule, the WFC was not required to conduct such an analysis for its stored FGAN. In addition, EPA is currently considering the inclusion of “facility and equipment siting factors” in the Risk Management Program rule.756 Furthermore, EPA addresses facility siting through regulation and guidance concerning the siting of hazardous waste management facilities near communities and sensitive environments.757 EPA also has issued guidelines relating to siting schools near potential environmental hazards, which could have proven

747 29 CFR 1910.119(e)(3)(vii). 748 29 CFR 1910.119. 749 29 CFR 1910.119, Appendix A. 750 29 CFR 1910.109, Table H-22. 751 27 CFR 555.220. 752 See: http://www.epa.gov/statelocalclimate/local/topics/land.html (accessed on December 28, 2015). 753 40 CFR 68.67(c)(5) (2014). 754 The only real guidance on these terms is found in API RP 752, “Permanent Building Siting”; API RP 753, “Portable Building Siting”; and API RP 756, Tent Siting (to be issued in 2014). However, these guidance documents have been developed without any regulatory guidance. Furthermore, the identified standards have nothing to do with the relationship of the facility to its surrounding community. See: http://www.absconsulting.com/webinars/facility-siting.cfm (accessed on December 28, 2015). 755 40 CFR 68.150–68.195 (2014). The analysis consists of two elements, a worst case release scenario and alternative release scenarios. 756 See: https://www.osha.gov/chemicalexecutiveorder/final_chemical_eo_status_report.pdf (accessed on December 28, 2015): 36. 757 See: http://www.epa.gov/osw/hazard/tsd/permit/site/sites.htm (accessed on December 28, 2015); 42 U.S.C. § 6924 (2014); 40 CFR 264.18 (2014); 40 CFR 265.18 (2014); 40 CFR 270.14(b)(11) (2014); and 40 CFR 270.32(b)(2) (2014). See also: http://homer.ornl.gov/sesa/environment/guidance/rcra/locate.pdf (accessed on December 28, 2015).

West Fertilizer Company Final Report January 2016 231 U.S. CHEMICAL SAFETY AND HAZARD INVESTIGATION BOARD

helpful to West and similarly situated communities.758 Moreover, EPA has recommended using information related to the Emergency Planning and Community Right-to-Know Act to inform a community’s decisions concerning zoning and land use planning.759 Thus, federal regulations and guidance on land use do exist and do give communities valuable information regarding various chemical hazards. However, because FGAN is not defined as an explosive or hazardous material, it is excluded from federal zoning regulations. Unfortunately, this situation allows fertilizer facilities to store FGAN onsite without any federal oversight to confirm that the associated risks of locating communities nearby are mitigated to sufficient levels. At the state level, Texas does little to oversee land use issues.760 Instead, Texas grants the most land use oversight authority to its municipalities.761 Texas has no regulation relating to siting hazardous facilities near communities.762 Moreover, no state administrative agency oversees hazardous facility siting.763 At the county level, regulatory authority is limited to zoning specific areas (such as Padre Island, Lake Tawakoni, and Falcon Lake), which results in a failure to approach county zoning from a general perspective.764 This observation does not indicate that a one-size-fits-all approach to zoning is always desired.765 In fact, in many instances, land use oversight needs to be tailored to specific political, social, economic, and environmental needs of the community.766

758 See: http://www.epa.gov/schools/siting/basic.html (accessed on December 28, 2015). 759 See: http://www.epa.gov/osweroe1/docs/chem/notice.pdf (accessed on January 6, 2016): 7; see also: http://www.nicsinfo.org/docs/LEPCStudyFinalReport.pdf (accessed on December 28, 2015): 7. 760 See: http://stateimpact.npr.org/texas/2013/04/22/after-west-fertilizer-explosion-concerns-over-safety-regulation- and-zoning/ (accessed on December 28, 2015). 761 Texas Statute, Local Government Code, Title 7, “Regulation of Land Use, Structures, Businesses, and Related Activities.” See: http://www.statutes.legis.state.tx.us/ (accessed on January 6, 2016). For instance, municipalities must adopt a zoning ordinance in accordance with a comprehensive plan; county zoning ordinances deal with specific areas such as military zones, Padre Island, and Amistad Recreation Area. See: http://www.statutes.legis.state.tx.us/Docs/LG/htm/LG.231.htm (accessed on December 28, 2015). 762 The Texas Administrative Code fails to address such siting issues. The Texas Department of Public Safety, Division of Emergency Management, holds responsibility for preparing the state emergency management plan, which may include “recommendations for zoning, building restrictions, and other land-use controls . . . to eliminate or reduce disasters or their impact . . . .” Texas Government Code, Title 4, Subtitle B, Chapter 418, Section 418.042. However, the state has not issued any such recommendations. See: https://www.txdps.state.tx.us/dem/downloadableforms.htm#stateplan (accessed on December 28, 2015). 763 See: http://texreg.sos.state.tx.us/public/readtac$ext.ViewTAC (accessed on December 29, 2015). 764 See: http://www.statutes.legis.state.tx.us/Docs/LG/htm/LG.231.htm (accessed on December 28, 2015). Texas House of Representatives, Committee on County Affairs. “Interim Report to the 80th Texas Legislature,” December 2006: 7. See also: http://www.lrl.state.tx.us/scanned/interim/79/C832.pdf (accessed on December 8, 2014). 765 APA discussion on Growing Smart project with Stuart Meck. See: http://www.planning.org/growingsmart/background.htm (accessed on January 6, 2016). 766 See: http://www.planning.org/growingsmart/background.htm (accessed on December 28, 2015).

West Fertilizer Company Final Report January 2016 232 U.S. CHEMICAL SAFETY AND HAZARD INVESTIGATION BOARD

At the local level, Texas municipalities are granted the authority to regulate private land, including the location of hazardous facilities.767 Among other requirements, the zoning regulations must be designed to ensure public safety from fires and other dangers.768 However, the municipality is not given the authority to remove the hazardous condition on the property that exists at the time the governing body implements zoning authority and that is used in a public service business.769 The municipality is allowed to impose zoning regulations relevant to the storage and use of hazardous substances.770 In the case of West, Texas, this arrangement led to the city being vested with the most authority in regulating public use. West exercised this authority through its Code of Ordinances.771 West had zoned all property within the city limits for residential purposes only. However, all real property that had been used for commercial purposes before 1987 could remain commercial in nature. Any future development with commercial intent required a rezoning procedure.772 This provision is consistent with West’s comprehensive plan to zone all property within the city limits as residential property. In essence, regulatory authority has been delegated to municipalities to oversee the siting of facilities storing and distributing FGAN near cities such as West. Neither the federal government nor the state of Texas takes any part in oversight. In many instances, however, municipalities are unable to adequately address this complex issue through regulatory mechanisms. For instance, facilities such as the WFC plant existed before promulgation of the city’s Code of Ordinances, posing an issue of grandfathered facilities. Many different economic, safety, environmental, and agricultural interests must also be balanced. Furthermore, municipalities already face a shortage of resources for other essential governmental functions. However, safety issues can be addressed through reasoned regulation, using a number of methods. For example, a regulation requiring separation distances between public receptors and facilities handling FGAN could help mitigate offsite consequences in cities such as West. At root, however, locating these facilities near communities represents a national concern; therefore, all levels of government should give consideration to developing land use regulations to counter this problem.

767 Texas Statute, Local Government Code, Title 7, Subtitle A, Chapter 211, Section 211.003. See: http://www.statutes.legis.state.tx.us/Docs/LG/pdf/LG.211.pdf (accessed on December 28, 2015). 768 Texas Statute, Local Government Code, Title 7, Subtitle A, Chapter 211, Section 211.004. See: http://www.statutes.legis.state.tx.us/Docs/LG/pdf/LG.211.pdf (accessed on December 28, 2015). 769 Texas Statute, Local Government Code, Title 7, Subtitle A, Chapter 211, Section 211.013. See: http://www.statutes.legis.state.tx.us/Docs/LG/pdf/LG.211.pdf (accessed on December 28, 2015). 770 Texas Statute, Local Government Code, Title 7, Subtitle A, Chapter 211, Section 211.017. See: http://www.statutes.legis.state.tx.us/Docs/LG/pdf/LG.211.pdf (accessed on December 28, 2015). The term “hazardous substances” is not defined in the chapter. 771 See: http://z2codes.franklinlegal.net/franklin/Z2Browser2.html?showset=westset (accessed on December 28, 2015). 772 Section 14.01.002. See: http://z2codes.franklinlegal.net/franklin/Z2Browser2.html?showset=westset (accessed on December 28, 2015).

West Fertilizer Company Final Report January 2016 233 U.S. CHEMICAL SAFETY AND HAZARD INVESTIGATION BOARD

  1. 3.1 Importance of Land Use Planning in Siting Communities Near Facilities

Storing FGAN and Other Hazardous Chemicals The issue of siting hazardous facilities storing FGAN near cities such as West is not an anomaly; it is a nationwide problem. In addition, although not directly associated with FGAN storage facilities, land use issues have been at the forefront of multiple CSB investigations. Furthermore, CSB has identified— multiple times—the risks of locating a hazardous chemical facility near public receptors. Table 15 lists CSB investigations that involved land use issues. Table 15. Investigations Involving Land Use Issues Investigation Public Receptors Chemical Involved Offsite Consequences NDK Crystal, Inc. Interstate commerce, businesses Synthetic quartz crystal (silica and NaOH) 1 fatality DPC (Festus, MO) Highways, railroads, residences, businesses, farms Chlorine 63 residents who sought medical treatment Concept Sciences Businesses, residences Hydroxylamine 5 fatalities, 14 injuries, significant damage to buildings and shattered windows at residences CAI/Arnel Businesses, residences Heptane, isopropyl alcohol, n-propyl alcohol 10 injuries, 24 houses and 6 businesses significantly destroyed DPC (Glendale, AZ) Residences Chlorine 14 injuries Freedom Industries Residences, businesses, drinking water supply MCHM, PPH 369 residents who sought medical treatment for exposure Millard Refrigerated Services Businesses, environment Anhydrous ammonia 150 people who sought medical treatment for ammonia exposure T-2 Laboratories Inc. Businesses, residences, railroads Methylcyclopentadienyl manganese tri-carbonyl 28 injuries, significant property damage to nearby businesses Silver Eagle Refinery Residences Hydrocarbons Damage to residences Kaltech Residences, businesses, public streets Chemical waste At least 36 injured people, damage to residences and businesses Chevron Refinery Residences, businesses, public streets Hydrocarbons Approximately 15,000 people who sought medical treatment

West Fertilizer Company Final Report January 2016 234 U.S. CHEMICAL SAFETY AND HAZARD INVESTIGATION BOARD

Investigation Public Receptors Chemical Involved Offsite Consequences Caribbean Petroleum Residences, businesses, public streets Hydrocarbons Shutdown of major highways, evacuation of local residents Bayer CropScience Residences, college, businesses, interstate commerce, waterways Methomyl, methyl isobutyl ketone Property damage, community shelter-in- place activated

In light of this information, the WFC incident in West serves as yet another unnecessary and deadly reminder that little has been done to address the risks of locating communities near facilities handling hazardous chemicals such as FGAN. Furthermore, if the incident had occurred during school hours, many more adults and children could have been injured. This incident represents a microcosm of the potential harms that many communities across the nations could endure.773 9.3.2 International Perspectives Other countries have confronted problems similar to those in West, Texas, and have taken a variety of approaches to address them. The European and Australian strategies merit consideration given their sophistication relative to the current U.S. approach. The discussion in this section explores the approaches taken by the European Union (EU), the United Kingdom (U.K.), and Australia. 9.3.2.1 European Union Through its Seveso III Directive, the EU requires member countries to take land use planning policies “into account” as part of major accident prevention.774 The policy behind the requirement is designed to mitigate the consequences of major chemical accidents experienced by public receptors. The EU developed this requirement in the aftermath of major industrial incidents, including the FGAN explosion in Toulouse.775 In fact, the Seveso III Directive lists AN as a “dangerous substance,” classifying the chemical into four different categories, depending on whether it is FGAN, technical grade ammonium

773 See: http://news.yahoo.com/devastated-texas-town-ponders-schools-140711695.html (accessed on December 29, 2015). Jaeah Lee. “Map: Is There a Risky Chemical Plant Near You?” Mother Jones (April 17, 2014). See: http://www.motherjones.com/environment/2014/04/west-texas-hazardous-chemical-map (accessed on July 8, 2014). 774 Seveso III Directive, Article 13, “Land-use planning.” See: http://eur-lex.europa.eu/legal- content/EN/TXT/?uri=CELEX:32012L0018 (accessed on November, 2, 2015). 775 G. Vierendeels, et al. “Modeling the major accident prevention legislation change process within Europe.” Safety Science. 516 (2010).

West Fertilizer Company Final Report January 2016 235 U.S. CHEMICAL SAFETY AND HAZARD INVESTIGATION BOARD

nitrate (TGAN), off-specification ammonium nitrate (AN), or AN capable of self-sustaining decomposition.776 Under the Seveso III requirements, member countries are to ensure that their policies address “appropriate distances” between covered facilities and residential areas. Furthermore, the countries must “set up appropriate consultation procedures” with competent authorities to “facilitate the implementation” of the land use planning policies. The Seveso III Directive applies to new facilities, facilities undergoing modifications, and new developments. Existing facilities must determine whether additional technical measures are required to avoid an increase in risk to the nearby community.777 The Seveso III Directive does not prescribe best practice guidance for its technical requirements (such as separation distances), consistent with its respect for each country’s political, cultural, technical, and economic differences. However, various entities such as the Institute for Systems and Informatics and Safety provide best practice guidance, which refers to the use of technical approaches and procedural issues.778 Although such guidance offers helpful insights to member countries, the appropriate response for a specific site is still recognized as a matter of interpretation for each country. Given the immense differences among the approaches to land use planning of the member countries, it is difficult to compare EU country land use policies. However, the establishment of groups such as the European Commission and the Committee of the Competent Authorities under the Seveso III Directive emphasizes the important role that land use planning issues play in the European community.779 Although issues still remain relating to each country’s practices and methodologies, the emphasis on siting of facilities storing hazardous materials near public receptors highlights the importance that the European community places on land use planning in major accident prevention. 9.3.2.2 United Kingdom The U.K. vests a hazardous substances authority with the power to administer and enforce land use planning as it relates to storing or using hazardous substances. The hazardous substances authority is generally an entity charged with dealing with land use planning and zoning issues, known as the local

776 Seveso III Directive, Notes Section, “AN compounds with more that 28% by weight and AN based fertilizers.” 2012/18/EU. See: http://eur-lex.europa.eu/legal-content/EN/TXT/?uri=CELEX:32012L0018 (accessed on November 2, 2015). 777 Seveso III Directive, Article 13, “Land-use planning.” 2012/18/EU. See: http://eur-lex.europa.eu/legal- content/EN/TXT/?uri=CELEX:32012L0018 (accessed on November 2, 2015). 778 Christou, M.D., and S. Porter. “Guidance on Land Use Planning as Required by Council Directive 96/82/EC (Seveso II).” Institute for Systems Informatics and Safety, 1999. See: http://ipsc.jrc.ec.europa.eu/fileadmin/repository/sta/mahb/docs/LandUsePlanning/EUR18695EN_LandUsePlanning Guidance.pdf (accessed on December 28, 2015). 779 Major Accident Hazards Bureau. “Land Use Planning.” See: http://ipsc.jrc.ec.europa.eu/index.php/Land-use- planning/694/0/ (accessed on December 28, 2015).

West Fertilizer Company Final Report January 2016 236 U.S. CHEMICAL SAFETY AND HAZARD INVESTIGATION BOARD

planning authority.780 Consequently, the U.K. takes an approach similar to that of the United States in decentralizing land use planning to allow a local authority to promulgate and enforce land use requirements.781 For the WFC incident in West, Texas, the West City Council would be the analogue to the U.K. hazardous substances authority. The U.K., however, requires land use policies to account for major accidents caused by hazardous substances.782 This responsibility is executed through a collaborative effort among the hazardous substances authority, U.K. Health and Safety Executive (HSE),783 U.K. Environment Agency,784 and other interested stakeholders. Essentially, organizers of a proposed development must seek a hazardous substances consent from the hazardous substances authority to establish a facility that will store or use hazardous substances785 within its jurisdiction.786 When the hazardous substances authority receives an application for consent, it must consult with the HSE and the U.K. Environment Agency for advice on whether consent to the proposed development is warranted. Other interested stakeholders are also consulted or given the opportunity to publicly comment on the proposed development.787 Using all of the relevant information provided, the hazardous substances authority weighs all competing interests and decides whether to grant a hazardous substances consent to the proposed development.788 The U.K. attempts to balance each local community’s interest in deciding the risks that it will tolerate, drawing on the expertise and resources of national governmental bodies. Such an approach makes it more likely that all relevant issues and concerns about locating a development that stores or uses hazardous substances near the public will be presented to the hazardous substances authority before a

780 See: https://www.gov.uk/government/uploads/system/uploads/attachment_data/file/16628/hazardoussubstancesguide.pdf (accessed on December 28, 2015). 781 The U.K. has experienced similar catastrophic incidents that had effects on the population, including the Flixborough (Nypro UK) Explosion in 1974 and the Buncefield incident in 2005. See: http://www.hse.gov.uk/comah/sragtech/caseflixboroug74.htm and http://www.buncefieldinvestigation.gov.uk/, respectively (accessed on December 28, 2015). 782 Seveso Directive II, Article 12, “Land Use Planning.” See: http://eur- lex.europa.eu/LexUriServ/LexUriServ.do?uri=CONSLEG:1996L0082:20031231:EN:PDF (accessed on December 28, 2015). 783 The U.K. HSE is a governmental body responsible for enforcing health and safety at workplaces. See: http://www.hse.gov.uk/contact/authority.htm (accessed on December 28, 2015). 784 The U.K. Environment Agency is a governmental body responsible for protecting and improving the environment and for promoting sustainable development. See: http://www.environment-agency.gov.uk/aboutus/default.aspx (accessed on December 28, 2015). 785 FGAN is included within the definition of a “hazardous substance.” See: http://www.legislation.gov.uk/uksi/1999/981/schedule/1/made (accessed on December 28, 2015). 786 See: http://www.hse.gov.uk/landuseplanning/what.htm (accessed on December 28, 2015). 787 Other stakeholders include the local parish council, fire and civil defense authorities, and the governmental agency English Nature. 788 See: http://www.environment-agency.gov.uk/aboutus/default.aspx (accessed on December 28, 2015).

West Fertilizer Company Final Report January 2016 237 U.S. CHEMICAL SAFETY AND HAZARD INVESTIGATION BOARD

decision is rendered. The U.K. thus believes that major offsite risks can be effectively managed before permitting a hazardous substance to be stored near a population in its vicinity.789 9.3.2.3 Western Australia Australia’s land use planning methods regarding hazardous substances vary across jurisdictions.790 Although each Australian state and territory applies varying regulations regarding land use planning of FGAN storage facilities, the Government of Western Australia employs an insightful and sophisticated approach to the issue. In essence, Western Australia uses a risk-based method that subjects FGAN storage facility siting to government approval.791 Western Australia legislatively addresses land use issues concerning FGAN through its Dangerous Goods Safety Act 2004 (the Dangerous Goods Act). This act places a duty on all people involved with dangerous goods to minimize risk associated with those goods.792 To minimize risk, the Dangerous Goods Act requires that “all reasonably practicable measures” be used. In determining whether a measure is “reasonably practicable,” consideration is given to issues such as the severity of the harm, severity of the risk to people, and suitability of the means in question.793 FGAN is treated as a dangerous good under the Dangerous Goods Safety (Storage and Handling Non-Explosives) Regulations 2007 and the Dangerous Goods Safety (Major Hazard Facilities) Regulations 2007, which both support the Dangerous Goods Act.794

789 See: https://www.gov.uk/government/uploads/system/uploads/attachment_data/file/16628/hazardoussubstancesguide.pdf (accessed on December 28, 2015). 790 See: http://www.chemicalspolicy.org/downloads/chemicals-plastics-regulation.pdf (accessed on December 29, 2015). 791 Dangerous Goods Safety Act 2004. See: http://www.slp.wa.gov.au/legislation/statutes.nsf/main_mrtitle_242_homepage.html (accessed on December 28, 2015). Dangerous Goods Safety (Storage and Handling Non-Explosives) Regulations 2007. See: http://www.slp.wa.gov.au/legislation/statutes.nsf/main_mrtitle_12972_homepage.html (accessed on December 28, 2015). Dangerous Goods Safety (Major Hazard Facilities) Regulations 2007. See: http://www.slp.wa.gov.au/legislation/statutes.nsf/main_mrtitle_12983_homepage.html (accessed on December 28, 2015). Department of Consumer and Employment Protection Government of Western Australia. Safe Storage of Solid FGAN: Code of Practice: iii. See: https://miningandblasting.files.wordpress.com/2009/09/safe-storage-of- solid-ammonium-nitrate-code-of-practice.pdf (accessed on December 28, 2015). 792 Dangerous Goods Safety Act 2004, Part 2. See: http://www.slp.wa.gov.au/legislation/statutes.nsf/main_mrtitle_242_homepage.html (accessed on December 28, 2015). 793 Ibid. 794 Dangerous Goods Safety (Storage and Handling Non-Explosives) Regulations 2007. See: http://www.slp.wa.gov.au/legislation/statutes.nsf/main_mrtitle_12972_homepage.html (accessed on December 28, 2015). Dangerous Goods Safety (Major Hazard Facilities) Regulations 2007. See: http://www.slp.wa.gov.au/legislation/statutes.nsf/main_mrtitle_12983_homepage.html (accessed on December 28, 2015). Department of Consumer and Employment Protection Government of Western Australia. Safe Storage of Solid FGAN: Code of Practice: iii. See: https://miningandblasting.files.wordpress.com/2009/09/safe-storage-of- solid-ammonium-nitrate-code-of-practice.pdf (accessed on December 28, 2015).

West Fertilizer Company Final Report January 2016 238 U.S. CHEMICAL SAFETY AND HAZARD INVESTIGATION BOARD

Land use planning as related to siting facilities storing FGAN near public receptors is implemented by applying separation distances. These distances are subject to acceptance by Resource Safety, a department of the Government of Western Australia.795 If it is determined that an FGAN facility is not satisfying the separation distance requirement, Resource Safety may limit the quantity of FGAN within the facility or require that other safety conditions be met.796 The New South Wales Department developed the required separation distances with the intent of reducing the risk of offsite consequences insofar as reasonably practicable.797 The distances were not designed to completely eliminate the risks associated with offsite consequences, nor were they intended to replace preventive controls.798 The separation distances are categorized by a threshold quantity (i.e., whether FGAN is stored in quantities greater than or less than 10 metric tons). For instance, if FGAN exceeding 10 tons is stored at a facility, it must be separated by at least 300 meters (985 feet) from critical infrastructure, 240 meters (790 feet) from residential buildings, and 140 meters (460 feet) from commercial buildings.799 Western Australia seeks to address land use planning through a risk-based scheme that requires government permission to site FGAN facilities near public receptors. Depending on the quantity of FGAN stored, each facility must be sited at a minimum distance from such public receptors. Furthermore, if the facility is not sited at the required minimum distance, it might have to limit the maximum quantity of FGAN that it can store. A study of the risk associated with a particular facility might be required to reach agreement between the government and the facility on appropriate separation

795 Department of Consumer and Employment Protection Government of Western Australia. Safe Storage of Solid FGAN: Code of Practice: 8–10. See: https://miningandblasting.files.wordpress.com/2009/09/safe-storage-of-solid- ammonium-nitrate-code-of-practice.pdf (accessed on December 28, 2015). See also: http://www.dmp.wa.gov.au/6611.aspx (accessed on December 28, 2015). 796 Department of Consumer and Employment Protection Government of Western Australia. Safe Storage of Solid FGAN: Code of Practice: 8–10. See: https://miningandblasting.files.wordpress.com/2009/09/safe-storage-of-solid- ammonium-nitrate-code-of-practice.pdf (accessed on December 28, 2015). 797 Department of Consumer and Employment Protection Government of Western Australia. Safe Storage of Solid FGAN: Code of Practice: 8–10. See: https://miningandblasting.files.wordpress.com/2009/09/safe-storage-of-solid- ammonium-nitrate-code-of-practice.pdf. Government of Western Australia. Code of Practice: Safe Storage of solid FGAN, 3rd Edition: 6-7. See: http://www.dmp.wa.gov.au/Documents/Dangerous-Goods/DGS_COP_StorageSolidAmmoniumNitrate.pdf (accessed on December 29, 2015). Hazardous Industry Planning Advisory Paper No. 4—Risk criteria for land use safety planning. HIPAP4. See: http://www.planning.nsw.gov.au/Policy-and- Legislation/~/media/0D39F08E7889409BBA1FA88D5FB859FD.ashx (accessed on January 7, 2014). 798 Department of Consumer and Employment Protection Government of Western Australia. Safe Storage of Solid Ammonium Nitrate: Code of Practice: 8–10. See: https://miningandblasting.files.wordpress.com/2009/09/safe- storage-of-solid-ammonium-nitrate-code-of-practice.pdf (accessed on January 6, 2016). Government of Western Australia. Code of Practice: Safe Storage of solid ammonium nitrate, 3rd Edition: 6–7. See: http://www.dmp.wa.gov.au/Documents/Dangerous-Goods/DGS_COP_StorageSolidAmmoniumNitrate.pdf (accessed on December 29, 2015). 799 Government of Western Australia. Code of Practice: Safe Storage of solid ammonium nitrate, 3rd Edition: 6–7. See: http://www.dmp.wa.gov.au/Documents/Dangerous-Goods/DGS_COP_StorageSolidAmmoniumNitrate.pdf (accessed on December 29, 2015).

West Fertilizer Company Final Report January 2016 239 U.S. CHEMICAL SAFETY AND HAZARD INVESTIGATION BOARD

distances. This approach gives Western Australia the capability to balance the risk associated with storing FGAN against the need for land development. 9.4 Efforts to Address Land Use Planning After the West Incident In the weeks, months, and years following the West incident, few inroads have been made to resolve land use issues. The federal government has developed a working group that is tasked with developing recommendations related to chemical facility safety and security; however, the timeline for delivery has been extended.800 At the state level, general opposition remains to any type of change in the Texas approach to land use planning.801 In fact, strong opposition has contested any regulation of FGAN facilities in Texas.802 The city of West is currently awaiting recommendations from state and federal officials; however, it does plan on siting any new fertilizer facilities away from the community.803 The Texas State Fire Marshal’s Office (SFMO) has taken a proactive approach by providing all counties with software demonstrations that estimate blast zones from facilities storing FGAN.804 In addition to assisting first responders, the software gives community leaders the opportunity to assess community impacts relating to the siting of a new FGAN facility. In addition, the SFMO will assist each county in reviewing best practices for dealing with the storage and handling of FGAN. At the county level, the McLennan County Local Emergency Planning Committee (LEPC) has emphasized the importance of land use issues in agreeing to focus on “upfront planning” when siting community buildings such as schools or hospitals near chemical facilities.805 The LEPC has agreed to continue to meet quarterly. The city of West has also committed to advising other communities about identifying the potential hazards that they might face in locating chemical facilities near their towns and citizens.806 Applied Research Associates, Inc. (Applied Research) has engaged in an effort to understand and validate the separation distances prescribed in NFPA 400. After completing a literature review, Applied Research selected a consequence-based case study and developed a test plan. The firm then carried out the case

800 See: https://www.osha.gov/chemicalexecutiveorder/index.html (accessed on December 28, 2015). 801 See: http://www.nytimes.com/2013/05/10/us/after-plant-explosion-texas-remains-wary-of-regulation.html?_r=0 (accessed on December 28, 2015). 802 Henry, Terrence, NPR. “Proposals to Prevent Another Fertilizer Explosion Immediately Meet Resistance,” July 2,

  1. See: http://stateimpact.npr.org/texas/2014/07/02/proposals-to-prevent-another-fertilizer-explosion-

immediately-meet-resistance/ (accessed on December 8, 2014). The Associated Press. “New bill on West blast would delay new rules.” CBS DFW (August 5, 2014). See: http://dfw.cbslocal.com/2014/08/05/new-bill-on-west- blast-would-delay-new-rules/ (accessed on December 29, 2015). 803 See: http://res.dallasnews.com/interactives/2013_December/westretrospective/1215_westretrospective.html (accessed on December 28, 2015). 804 See: http://res.dallasnews.com/interactives/2013_December/westretrospective/1215_assessment.html (accessed on December 28, 2015). 805 Ibid. 806 Ibid.

West Fertilizer Company Final Report January 2016 240 U.S. CHEMICAL SAFETY AND HAZARD INVESTIGATION BOARD

study test plan to assess the adequacy of the separation distance for safe storage of AN and the safe separation distance for personnel in a process building in the event of an explosion. Applied Research then developed a series of recommendations regarding separation distances in NFPA 400, including possible approaches for improving those distances, to guide NFPA and its affiliated Fire Protection Research Foundation project panel in future research efforts.807 The city of West is currently rebuilding. The blast substantially damaged more than 350 homes, completely destroying 150 of them, and caused approximately $100 million in damages.808 The West High School has been razed, and a new school will be constructed on the same site.809 The site of the accident will likely become an industrial park.810 10.0 Key Findings Technical Findings

  1. The presence of combustible materials used for construction of the facility and the fertilizer grade

ammonium nitrate (FGAN) storage bins, in addition to the West Fertilizer Company (WFC) practice of storing combustibles near the FGAN pile, contributed to the progression and intensity of the fire and likely resulted in the detonation.

  1. The WFC facility did not have a fire detection system to alert emergency responders or an

automatic sprinkler system to extinguish the fire at an earlier stage of the incident.

  1. On the basis of interviews with eyewitnesses and supporting photographic evidence, the first

observed fire and smoke originated in and above the seed room and progressed throughout the northern half of the WFC facility. The radiant heat from the fire, fueled by the structure, flammable building contents, and the asphalt roof shingles, likely heated the surface of the FGAN pile. Contamination from soot, molten asphalt, and molten polyvinyl chloride (PVC) from an overhead conveyer produced a detonable mixture of combustibles and FGAN oxidizers. Increased ventilation generated a brighter and hotter flame, heating the FGAN-fuel mixture on the surface of the pile. Regulatory Findings

  1. Occupational Safety and Health Administration (OSHA) efforts to oversee facilities that store and

handle FGAN fell short at the time of the incident.

807 Fire Protection Research Foundation. “Separation Distances in NFPA Codes and Standards, 2014.” See: http://www.nfpa.org/Assets/files/AboutTheCodes/59A/RFSeparationDistancesNFPACodesAndStandards.pdf (accessed on September 25, 2015). 808 See: http://www.hazmatmag.com/news/in-harms-way/1002482923/ (accessed on January 6, 2016) and http://res.dallasnews.com/interactives/2013_December/westretrospective/1215_whatwelearned.html (accessed on December 28, 2015). 809 CBS. “DFW, West Getting New Schools After Explosion,” October 30, 2014. See: http://dfw.cbslocal.com/2014/10/30/west-getting-new-schools-after-explosion/ (accessed on December 6, 2014). 810 See: http://res.dallasnews.com/interactives/2013_December/westretrospective/1215_westretrospective.html (accessed on December 28, 2015).

West Fertilizer Company Final Report January 2016 241 U.S. CHEMICAL SAFETY AND HAZARD INVESTIGATION BOARD

a. Section (i) of the OSHA Explosives and Blasting Agents standard, 29 CFR 1910.109(i), was not very well known among those in the fertilizer industry, likely due in part to the fact that (1) application of the section was unclear; and (2) the section had rarely been used previously to cite fertilizer facilities. b. OSHA inadvertently omitted ammonium nitrate (AN) from the List of Highly Hazardous Chemicals, Toxics and Reactives in its Process Safety Management (PSM) standard, 29 CFR 1910.119, even though AN possesses reactive characteristics that would have triggered its inclusion.

  1. Because the WFC facility was covered under the U.S. Environmental Protection Agency (EPA)

Risk Management Program rule for its anhydrous ammonia tanks (but not for its FGAN), WFC employees and emergency responders demonstrated a greater awareness of the hazards associated with onsite storage of anhydrous ammonia than those associated with FGAN. AN is not on the EPA Risk Management Program list of chemicals, so the WFC was not required to take safety measures for FGAN similar to those for ammonia. Insurance Findings

  1. WFC’s previous property and liability insurer, which provided insurance to WFC from 2006

through 2009, did not focus on FGAN hazards in its annual insurance inspections because it was not required to do so. However, the insurer did not renew WFC’s commercial property policy in 2010 because WFC repeatedly failed to comply with the insurer’s safety-related recommendations (e.g., to replace corroded electrical wiring), which were identified in loss control surveys. The CSB found little evidence of onsite activity or inspections by WFC’s subsequent insurer, U.S. Fire, which insured the facility at the time of the incident. Emergency Response Findings

  1. The West Volunteer Fire Department (WVFD) did not conduct pre-incident planning or response

training at the WFC facility to address FGAN-related incidents because was no such regulatory requirement. Thus, the firefighters who responded to the WFC fire did not have sufficient information to make an informed decision on how best to respond to the fire at the fertilizer facility.

  1. Federal and state of Texas curriculum manuals used for hazardous materials (HAZMAT) training

and certification of firefighters placed little emphasis on emergency response to storage sites containing FGAN. On the other hand, HAZMAT shipping and transportation were covered frequently in the courses. Many federal and state grants support the resource needs of firefighters and fire departments; however, these grants are used more often for resources such as personal protection equipment or firefighting equipment rather than for training.

  1. Lessons learned from previous FGAN-related fires and explosions were not shared with volunteer

fire departments, including the WVFD. If previous lessons learned had been applied in West, the firefighters and emergency personnel who responded to the incident might have better understood the risks associated with FGAN-related fire.

West Fertilizer Company Final Report January 2016 242 U.S. CHEMICAL SAFETY AND HAZARD INVESTIGATION BOARD

Emergency Planning Findings

  1. Despite WFC documentation of its FGAN in a 2012 Tier II report, the WVFD did not conduct

drills and exercises at the WFC facility before the 2013 fire and explosion.

  1. The agricultural use exemption under the Emergency Planning and Community Right-to-Know

Act (EPCRA) is not clear about which facilities are covered under the exemption. Before the WFC fire and explosion, the state of Texas determined that the WFC was exempt under the EPCRA agricultural use exemption. Land Use Planning Findings

  1. At the time of its construction, the WFC facility was surrounded by open fields, and no zoning

regulations existed when it began operations.

  1. As the city of West developed over the years, it expanded toward the WFC facility.
  2. The proximity of the city of West to the WFC facility magnified the offsite consequence impacts.
  3. Other FGAN facilities throughout Texas are located in close proximity to schools, residences, and

care facilities. Of the 40 FGAN facilities in Texas as of October 2015, 48 percent are within 0.5 miles of a school, nursing home, or hospital while 83 percent are within 0.25 miles of a residence.

  1. 0 Recommendations

U.S. Environmental Protection Agency (EPA) 2013-02-I-TX R1

Develop a guidance document on Emergency Planning and Community Right-to-Know Act (EPCRA) requirements that is issued annually to State Emergency Response Commissions (SERCs) and Local Emergency Planning Committees (LEPCs) and ensure that the guidance focuses on the following: a. Explains which chemicals are exempt and which must be reported. b. Describes how emergency responders should use Tier I and Tier II inventory reports and Safety Data Sheets, such as in safety training, practice drills, and for emergency planning. c. Includes comprehensive LEPC planning requirements, with an emphasis on annual training exercises and drills for local emergency response agencies.

2013-02-I-TX R2

Develop a general guidance document on the agricultural exemption under EPCRA Section 311(e)(5) and its associated regulation, 40 CFR 370.13(c)(3), to clarify that fertilizer facilities that store or blend fertilizer are covered under EPCRA. Communicate to the fertilizer industry publication of this guidance document as well as the intention of Section 311(e)(5).

West Fertilizer Company Final Report January 2016 243 U.S. CHEMICAL SAFETY AND HAZARD INVESTIGATION BOARD

2013-02-I-TX R3

Revise the Risk Management Program rule to include fertilizer grade ammonium nitrate (FGAN) at an appropriate threshold quantity on the List of Regulated Substances. a. Ensure that the calculation for the offsite consequence analysis considers the unique explosive characteristics of FGAN explosions to determine the endpoint for explosive effects and overpressure levels. Examples of such analyses include that adopted by the 2014 Fire Protection Research Foundation report, “Separation Distances in NFPA Codes and Standards,” Great Britain’s Health and Safety Executive, and other technical guidance. b. Develop Risk Management Program rule guidance document(s) for regulated FGAN facilities. U.S. Occupational Safety and Health Administration (OSHA) 2013-02-I-TX R4

Develop and issue a Regional Emphasis Program for Section (i) of the Explosives and Blasting Agent standard, 29 CFR 1910.109(i), in appropriate regions (such as Regions IV, VI, and VII) where fertilizer grade ammonium nitrate (FGAN) facilities similar to the West Fertilizer Company facility are prevalent. Establish a minimum number of emphasis program inspections per region for each fiscal year. Work with regional offices to communicate information about the emphasis program to potential inspection recipients.

2013-02-I-TX R5

Implement one of the following two regulatory changes, either option (a) or (b) below, to address FGAN hazards: a. Add FGAN to the OSHA Process Safety Management (PSM) standard List of Highly Hazardous Chemicals, Toxics and Reactives in 29 CFR 1910.119, Appendix A, and establish an appropriate threshold quantity. Identify National Fire Protection Association (NFPA) 400 as a source of Recognized and Generally Accepted Good Engineering Practices (RAGAGEP) for PSM-covered FGAN equipment and processes. b. Revise the OSHA Explosives and Blasting Agents standard, 29 CFR 1910.109, to ensure that the title, scope, or both make(s) clear that the standard applies to facilities that store bulk quantities of FGAN. Revise 1910.109(i), “Storage of Ammonium Nitrate,” to include requirements similar to those in NFPA 400, Hazardous Materials Code (2016 Edition), Chapter 11. Ensure the following elements are considered: i. For new construction, prohibit combustible materials of construction for FGAN facilities and FGAN bins. For existing facilities, establish a phase-in requirement for the replacement of wooden bins with bins made of noncombustible materials of construction within a reasonable time period (e.g., 3 to 5 years from the date standard revisions are enacted), based on feedback from the fertilizer industry. ii. Require automatic fire sprinkler systems and fire detection systems for indoor FGAN storage areas.

West Fertilizer Company Final Report January 2016 244 U.S. CHEMICAL SAFETY AND HAZARD INVESTIGATION BOARD

iii. Define adequate ventilation for FGAN for indoor storage areas. iv. Require all FGAN storage areas to be isolated from the storage of combustible, flammable, and other contaminating materials. v. Establish separation distances between FGAN storage areas and other hazardous chemicals, processes, and facility boundaries. International Code Council (ICC) 2013-02-I-TX R6

In a subsequent edition of the International Fire Code, develop a chapter or a separate section under Chapter 50 (“Hazardous Materials”) or Chapter 63 (“Oxidizers, Oxidizing Gases and Oxidizing Cryogenic Fluids”) that includes the following requirements for the storage and handling of ammonium nitrate (AN): a. Require automatic fire detection and suppression systems in existing buildings constructed of combustible materials b. Provide ventilation requirements in accordance with the International Mechanical Code to prevent the accumulation of off-gases produced during AN decomposition c. Provide smoke and heat vents to remove heat from AN during fire situations d. Establish minimum safe separation distances between AN and combustible materials to avoid contamination in the event of fire. e. Prohibit the use of combustible materials of construction. Department of Homeland Security, Federal Emergency Management Agency (FEMA) 2013-02-I-TX R7

Through a new or existing program and in conjunction with training partners, create and implement a competitive funding mechanism to provide training to regional, state, and local career and volunteer fire departments on how to respond to fire and explosion incidents at facilities that store fertilizer grade ammonium nitrate (FGAN). Continue to use available funding to ensure training effectiveness.

2013-02-I-TX R8

During the proposal review process for the program, ensure that the FGAN training includes multiple delivery methods to enable a broad reach. Training should allow for instructor-led, web- based, and train-the-trainer courses; initial orientation; and refresher training. Training also should accommodate both resident and mobile capabilities to facilitate flexible delivery.

Objectives of the selected training course should address the following: a. Previous FGAN fire and explosion incidents, incorporating lessons learned b. Hazards posed by other materials and chemicals stored near FGAN, including FGAN incompatibility with those materials and chemicals

West Fertilizer Company Final Report January 2016 245 U.S. CHEMICAL SAFETY AND HAZARD INVESTIGATION BOARD

c. Pre-incident planning for fires involving FGAN d. On-scene emergency response and decision-making requirements for FGAN fires, including risk assessment, scene size-up, and situational awareness e. National Incident Management System and Incident Command System.

2013-02-I-TX R9

Assist training partners to develop and provide continual oversight for an FGAN training program. In addition, evaluate the training curriculum to confirm that it adequately meets course objectives as well as the details of recommendation 2013-02-I-TX R8.

2013-02-I-TX R10

Develop an outreach program that notifies regional, state, and local fire departments about available FGAN training opportunities. The program should include the following: a. Guidance for fire departments on how to identify FGAN hazards within their communities by engaging State Emergency Response Commissions and Local Emergency Planning Committees b. Details on how to obtain FGAN training by submitting a proposal in response to the funding opportunity c. Information on training partners and programs that provide FGAN training. Texas Commission on Fire Protection (TCFP) 2013-02-I-TX R11

Develop minimum standards for course curricula to include hazard awareness of fertilizer grade ammonium nitrate (FGAN) for those fire departments that either have FGAN facilities in their jurisdictions or respond as mutual aid to other jurisdictions with FGAN facilities. In addition, develop a training program specific to FGAN.

Objectives of the program’s training course should address the following: a. Previous FGAN fire and explosion incidents, incorporating lessons learned b. Hazards posed by other materials and chemicals stored near FGAN, including FGAN incompatibility with those materials and chemicals c. Pre-incident planning for fires involving FGAN d. On-scene emergency response and decision-making requirements for FGAN fires, including risk assessment, scene size-up, and situational awareness e. National Incident Management System and Incident Command System.

2013-02-I-TX R12

Implement outreach to regional, state, and local fire departments that either have FGAN facilities in their jurisdictions or respond as mutual aid to jurisdictions with FGAN facilities, informing them about the new FGAN training certification requirements and opportunities to receive training. Include the following in the outreach:

West Fertilizer Company Final Report January 2016 246 U.S. CHEMICAL SAFETY AND HAZARD INVESTIGATION BOARD

a. Guidance for fire departments on how to identify FGAN hazards within their communities by engaging State Emergency Response Commissions and Local Emergency Planning Committees b. Encouragement for fire departments in jurisdictions with FGAN facilities to become certified in FGAN training. State Firefighters’ and Fire Marshals’ Association of Texas (SFFMA) 2013-02-I-TX R13

Develop a fertilizer grade ammonium nitrate (FGAN) training certification program for fire departments that either have FGAN facilities in their jurisdictions or respond as mutual aid to other jurisdictions with FGAN facilities. The certification program should include multiple delivery methods to enable a broad reach. The certification program should allow for instructor- led, web-based, and train-the-trainer courses; initial orientation; and refresher training. The training also should accommodate both resident and mobile capabilities to facilitate flexibility in delivery.

The criteria for the certification program should address the following: a. Previous FGAN fire and explosion incidents, incorporating lessons learned b. Hazards posed by other materials and chemicals stored near FGAN, including FGAN incompatibility with those materials and chemicals c. Pre-incident planning for fires involving FGAN d. On-scene emergency response and decision-making requirements for FGAN fires, including risk assessment, scene size-up, and situational awareness e. National Incident Management System and Incident Command System.

2013-02-I-TX R14

Develop an outreach component for the training certification program that notifies regional, state, and local fire departments with FGAN facilities in their jurisdictions about the training certification opportunities available for FGAN. Ensure that the following items are included in the development of this program: a. Guidance for fire departments on how to identify FGAN hazards within their communities by engaging State Emergency Response Commissions and Local Emergency Planning Committees b. Encouragement for members in jurisdictions with FGAN facilities to become certified in FGAN training c. Information on training partners and programs that provide FGAN training. Texas A&M Engineering Extension Services (TEEX) 2013-02-I-TX R15

West Fertilizer Company Final Report January 2016 247 U.S. CHEMICAL SAFETY AND HAZARD INVESTIGATION BOARD

Develop and administer a hazardous materials training module for career and volunteer fire departments that addresses fertilizer grade ammonium nitrate (FGAN) and other hazardous materials or chemicals that could pose new specialized hazards. Ensure that the training includes multiple delivery methods to enable a broad reach. The training should allow for instructor-led, web-based, and train-the-trainer courses; initial orientation; and refresher training. The training also should accommodate both resident and mobile capabilities to facilitate flexibility in delivery.

Objectives of the training course should address the following: a. How to respond to industrial fires involving FGAN and other hazardous materials or chemicals that could pose new specialized hazards to responding firefighters b. Previous FGAN fire and explosion incidents, incorporating lessons learned c. Hazards posed by other materials and chemicals stored near the FGAN, including FGAN incompatibility with those materials and chemicals d. Pre-incident planning for fires involving FGAN and other hazardous materials or chemicals that could pose new specialized hazards to responding firefighters e. On-scene emergency response and decision-making requirements for FGAN fires, including risk assessment, scene size-up, and situational awareness f. National Incident Management System and Incident Command System.

2013-02-I-TX R16

Develop an outreach program that notifies state, regional, and local fire departments about available FGAN training opportunities. The program should include the following elements: a. Guidance for fire departments on how to identify FGAN and other recognized hazards associated with other hazardous materials or chemicals within their communities by engaging with State Emergency Response Commissions and Local Emergency Planning Committees b. Promotion of use of the hazardous materials training module with TEEX training partners. Texas Department of Insurance (TDI) 2013-02-I-TX R17

For companies that provide insurance to agricultural facilities storing bulk fertilizer grade ammonium nitrate (FGAN) in Texas, including surplus lines insurers and Texas-registered risk retention groups, develop and issue guidance to assist in underwriting risk and conducting annual loss control surveys. Guidance should include the following: a. Combustible materials of construction for facilities and bins storing FGAN b. Storage of combustible materials near FGAN piles c. Adequate ventilation for indoor FGAN storage areas d. Automatic sprinklers and smoke detection systems for indoor FGAN storage areas e. Separation distances between FGAN and other hazardous materials onsite

West Fertilizer Company Final Report January 2016 248 U.S. CHEMICAL SAFETY AND HAZARD INVESTIGATION BOARD

f. Potential for offsite consequences from a fire or explosion, including the proximity of FGAN facilities to nearby residences, schools, hospitals, and other community structures. Provide references in the guidance document to existing materials from the following sources or to other equivalent guidance: a. National Fire Protection Association (NFPA), NFPA 400, Hazardous Materials Code, 2016 Edition, Chapter 11, “Ammonium Nitrate” b. FM Global, “Property Loss Prevention Data Sheet 7-89” c. U.S. Environmental Protection Agency, Occupational Safety and Health Administration, and Bureau of Alcohol, Tobacco, Firearms and Explosives; “Chemical Advisory: Safe Storage, Handling, and Management of Solid Ammonium Nitrate Prills” d. TDI, “Best Practices for the Storage of Ammonium Nitrate” e. National Fire Protection Research Foundation, “Separation Distances and NFPA Codes and Standards.” West Volunteer Fire Department (WVFD) 2013-02-I-TX R18

Develop standard operating procedures for pre-incident planning for facilities that store or handle hazardous materials such as fertilizer grade ammonium nitrate (FGAN). El Dorado Chemical Company (EDC) 2013-02-I-TX R19

For all distributors and bulk retail sites (i.e., customers) that receive fertilizer grade ammonium nitrate (FGAN) manufactured by El Dorado Chemical Company (EDC) for storage, shipment, and sale: a. Encourage customers to conduct internal monitoring and auditing (in accordance with recent industry standards and guidelines) in locations where FGAN will be stored or used. Communicate that such internal monitoring and auditing may be conducted through established product safety programs, including ResponsibleAg. b. Develop a process to establish mutual product stewardship expectations for the downstream chain of customers. Communicate expectations to existing customers, and to new customers before their first shipment of FGAN. Include the following components: i. For all FGAN sold to distributors, encourage distributors to provide Safety Data Sheets and FGAN safety guidance to their customers and bulk retail sites to which FGAN is sold or shipped ii. For all EDC bulk retailers and non-EDC bulk retailers that store and sell FGAN, encourage bulk retailers to address, such as through certification checklists, the following: • Written procedures for the safe handling of FGAN, including employee training

West Fertilizer Company Final Report January 2016 249 U.S. CHEMICAL SAFETY AND HAZARD INVESTIGATION BOARD

• Emergency response plans to be sent to Local Emergency Planning Committees and local fire departments • Tier II Chemical Inventory Report submissions. This signature block is placed immediately after the last recommendation. By the U.S. Chemical Safety and Hazard Investigation Board

Vanessa Allen Sutherland

Chair

Kristen Kulinowski

Member

Manuel Ehrlich

Member

Richard Engler

Member

Date of Board Approval

West Fertilizer Company Final Report January 2016 250 U.S. CHEMICAL SAFETY AND HAZARD INVESTIGATION BOARD

  1. 0 Appendix A: Rebuilding of the West Independent School

District The West Independent School District (WISD) ultimately decided to demolish the West Intermediate School (WIS),1 West High School (WHS), and approximately half of West Middle School (WMS) based on the level of damage to these buildings. The WISD is rebuilding by constructing a combined middle school and high school consisting of a common entryway, cafeteria, and auditorium but separate offices and gymnasiums for each school. The left side of the structure will accommodate the middle school students (grades 6 through 8), and the right side will serve high school students (grades 9 through 12). Table 16 shows the distribution of grade levels within the old facilities and the new facilities. Groundbreaking took place on October 30, 2014, and construction began shortly thereafter; the WISD expects the school to open in September 2016. The new West Middle School/West High School will be located on the same site as the previous WHS campus. The site will house the WISD baseball field, softball field, eight-lane running track and facilities for field events, two practice fields, four tennis courts, and supporting concession and restroom facilities.2 Although the city demolished the WIS campus, the existing site paving remained in place so that it could serve as temporary parking for the WISD transportation department. The former WIS site currently houses a donated metal building used for agriculture shop for WHS students3 but could potentially become the final location of the WISD transportation, maintenance, and receiving facility.

1 WIS will not be rebuilt. 2 See: http://www.restorewestisd.com/assets/sd_west-hs-ms-final-web.pdf (accessed on December 30, 2015). 3 The donated metal building is approximately a block and a half from the temporary high school; however, it would take up too much instructional time for students to walk there, so buses take each class to the shop on days when students participate in agriculture class.

West Fertilizer Company Final Report January 2016 251 U.S. CHEMICAL SAFETY AND HAZARD INVESTIGATION BOARD

Table 16. Distribution of Grade Levels at the Old and New WISD Schools School Old Facilities (Grades) New Facilities (Grades) West Intermediate School 4 and 5 Not rebuilt West Middle School 6 and 7 6 through 8 West High School 7 through 12 9 through 12 West Elementary School K through 3 K through 5

During the rebuild, the WISD created a temporary campus for middle and high school students, ultimately locating it on the existing middle school site. Students in grades pre-K through 5 attended school at West Elementary School, which sustained minimal damage in the explosion. Students in grades 6 through 12 were housed in temporary facilities at the existing WMS site.4 The sixth graders from WMS initially transferred to portable structures behind the elementary school until the end of the school year before moving to the middle school site for the 2013–2014 school year. The students in grades 7 through 12 moved to empty buildings owned by the Connally Independent School District,5 which is about 9 miles south of West, from April 17, 2013, until the end of the school year. Although the physical location of classes changed, WISD teachers still taught these students, who were still enrolled in the WISD. In August 2013, all of the students in grades 7 through 12 returned to West for classes in modular and portable buildings, and they eventually will transfer to the new school once the rebuild is complete. The temporary middle school and high school site consisted of 17 temporary portable facilities, 10 portable facilities donated by surrounding school districts that were leased by the WISD, and a temporary structure to cover the existing foundation and floor system saved from the original practice gymnasium.6 FEMA provided the WISD with a grant totaling nearly $20.8 million to assist in providing secure temporary classrooms and administrative buildings to replace those that were destroyed.7 The FEMA grant will pay the federal share, or 75 percent, of the eligible costs for the rebuild, and the WISD will

4 See: http://www.restorewestisd.com/plans.html (accessed on December 30, 2015). 5 Connally Independent School District is a Texas public school district located in central McLennan County, serving the cities of Lacy, Lakeview, and Waco as well as the communities of Elm Mott, Chalk Bluff, and Gholson. 6 See: http://www.restorewestisd.com/plans.html (accessed on December 30, 2015). 7 See: http://www.fema.gov/news-release/2013/08/01/fema-obligates-nearly-28-million-west-texas-independent- school-district (accessed on December 30, 2015). See: http://www.wfaa.com/story/local/2015/07/06/14167886/ (accessed on December 30, 2015).

West Fertilizer Company Final Report January 2016 252 U.S. CHEMICAL SAFETY AND HAZARD INVESTIGATION BOARD

cover the remaining 25 percent of the cost. The remaining cost to rebuild will be funded by the Texas Education Agency, which is providing the WISD with almost $10.3 million in Foundation School Program funds. At the time of the incident, the WISD was insured for $58 million. The school district received $30 million from the Argonaut Insurance Company, the WISD’s insurance carrier at the time of the explosion; however, WISD assessments indicate that the damage to its four schools far exceeded $30 million. Currently, the WISD is in litigation with Argonaut Insurance Company,8 Trident Insurance Services LLC,9and the Texas Association of Public Educators.10 Based on a district assessment and planning presentation to the WISD Board of Trustees on April 29, 2013, the proposed cost for rebuilding temporary facilities and renovating the facilities damaged by the explosion would amount to $16,562,706.11 This Phase One cost estimate for temporary facilities and renovations includes the following: • Existing administrative and office building renovations. • High school football stadium renovations. • Existing middle school site (1967 gymnasium repair, 1923 and 1957 building weatherization, maintenance and transportation building replacement). • Existing elementary school cafeteria additions and building renovations. • WISD-wide demolition and temporary classrooms. • Loose equipment moving and temporary storage. • WISD-wide technology connectivity. • Contingency funds. The initial proposed estimated cost for Phase Two rebuilding—including a new high school, new intermediate and middle school, new track and field facility, new maintenance and transportation permanent replacement building and contingency, and program financial audit—was $100,791,719.12 13.0 Appendix B: FGAN Incidents Tables Appendix B provides two tables, both depicting incidents involving FGAN. CSB listed only those incidents that it could confirm. As such, these lists are not meant to be comprehensive. The first table

8 Argonaut Insurance provides specialty property and casualty insurance and is a subsidiary of Argo Group International Holdings, Ltd. 9 Trident Insurance Services is a specialty commercial insurance provider for small- to middle-market public sector entities; it served as the administrator and adjustor for the insurance policy sold by Argonaut Insurance Company. 10 The Texas Association of Public Educators is a nonprofit organization managed by Argonaut Insurance Company to assist in the procurement of insurance and the administration of claims for school districts. 11 See: http://www.restorewestisd.com/assets/west-isd-presentation_final-sm.pdf (accessed on December 30, 2015). 12 See: http://www.restorewestisd.com/assets/west-isd-presentation_final-sm.pdf (accessed on December 30, 2015).

West Fertilizer Company Final Report January 2016 253 U.S. CHEMICAL SAFETY AND HAZARD INVESTIGATION BOARD

(Table 17) provides only those FGAN incidents that occurred at stationary sites. The second table (Table 18) shows all other FGAN incidents, many of which are transportation-related. The incidents are listed chronologically. Date, location, and a brief description of each incident are provided. For transportation incidents, the location given is the location where the incident occurred. An indication of whether the incident involved fire and/or explosion is also included. Quantity, or mass, of FGAN involved in each incident is provided as well. This information may or may not reflect the quantity of FGAN that actually caught fire and/or detonated. Where available, a description of casualties and property damage is given. Where information could not be found or determined, entries appear blank. Of the 32 total confirmed FGAN incidents researched by CSB, 22 occurred at stationary sites. At least 654 fatalities resulted from these stationary-site incidents. Thousands were injured and/or evacuated. Of the 10 FGAN incidents that occurred at non-stationary sites, at least 823 were fatally injured. Again, thousands were injured and/or evacuated.

West Fertilizer Company Final Report January 2016 254 Table 17. FGAN Incidents at Stationary Sites Date Location Description Fire Explosion Quantity (lbs) Casualties Property Damage References 14-Jan- 1916 Gibbstown NJ, USA Explosion occurred in evaporating pan

x 4K • One fatality • 12 injured Plant property heavily damaged 1 21-May -1921 Oppau, Germany Detonation involved FGAN and ammonium sulfate mixture or hidden explosives

x 900K • 561 fatalities • 2,000 injured Buildings flattened 2 1-Mar- 1924 New Brunswick (Nixon), NJ Explosion occurred at fertilizer building x x

• At least 20 fatalities • A dozen missing

3 5-Aug- 1940 Miramas, France Explosion of freight car launched explosive shell into burning mixture of FGAN and toluene at storage building x x 480K

4 26-Aug- 1947 Presque Isle, ME Fire involving fertilizers occurred

x

5

1 NFPA. Quarterly of the NFPA, Vol. 16, No. 1. July 1922. See: https://books.google.com/books?id=- MAdAQAAIAAJ&printsec=frontcover&source=gbs_ge_summary_r&cad=0#v=onepage&q&f=false (accessed on December 30, 2015). 2 Oxley, J.C. et al. “AN: thermal stability and explosivity modifiers.” Thermochimica Acta 384 (2002): 23–45. 3 See: http://query.nytimes.com/gst/abstract.html?res=9E05EEDD1E3CE733A25751C0A9659C946595D6CF (accessed on December 31, 2015). 4 See: http://www.societechimiquedefrance.fr/extras/Guiochon%20VO/exinvolontaireVO.htm (accessed on December 31, 2015). 5 Oxley, J.C. et al. “AN: thermal stability and explosivity modifiers.” Thermochimica Acta 384 (2002): 23–45.

West Fertilizer Company Final Report January 2016 255 Date Location Description Fire Explosion Quantity (lbs) Casualties Property Damage References 1-Sep- 1947 St. Stephens, Canada Fire occurred in warehouse containing bagged FGAN

x

800K

6 14-Oct- 1949 Independence, KS Fire occurred in warehouse next to storage building containing FGAN piled in paper bags

x

  1. 8– 5.4 million

7 9-Nov- 1966 Mt. Vernon, MO Explosion involving bagged FGAN occurred x x 100K

8 c. 1967 USA Screw conveyor shaft for FGAN burst after welding operation x x

9 c. 1973 Cherokee, OK Severe storage fire occurred in wooden FGAN storage area x x 28 million None injured

10 c. 1978 Rocky Mountain, NC Fire occurred at storage facility containing FGAN

x

1 million

Storage facility destroyed by fire 11

6 Ibid. 7 Ibid. 8 Ibid. 9 ABS Consulting. “West Fertilizer Incident Support Services Final Report.” August 28, 2015. 10 Marlair, G., and M.A. Kordek. “Safety and security issues relating to low capacity storage of AN-based fertilizers.” Journal of Hazardous Materials 123(1–3) (2005): 13–28. 11 Oxley, J.C. et al. “AN: thermal stability and explosivity modifiers.” Thermochimica Acta 384 (2002): 23–45.

West Fertilizer Company Final Report January 2016 256 Date Location Description Fire Explosion Quantity (lbs) Casualties Property Damage References c. 1979 Moreland, ID Fire involved wood framework and belting of overhead conveyor system in fertilizer plant while being used to unload railroad car of FGAN

x

400K

Fire spread to roof 12 c. 1982 United Kingdom Fire in warehouse where wooden furniture stored near FGAN resulted in deflagration x x 6 million 750–1,000 evacuated

13 13-Dec- 1994 Port Neal, IA Two explosions occurred at the Terra Industries AN plant

x

• Four fatalities • 18 injured • Anhydrous ammonia released • Ground water under plant contaminated 14 6-Jan- 1998 Xingping, Shaanxi, China Explosions occurred at fertilizer company

x

• 24 fatalities • 56 injured

12 Boggs, Thomas L. et al. “Realistic Safe-Separation Distance Determination for Mass Fire Hazards.” Naval Air Warfare Center Weapons Division. March 2013. 13 Nygaard, Erik C. et al. “Safety of Ammonium Nitrate.” International Society of Explosives Engineers. Vol. 2, 2006. See: https://miningandblasting.files.wordpress.com/2009/09/safety-of-ammonium-nitrate.pdf (accessed on January 4, 2016). 14 Boggs, Thomas L. et al. “Realistic Safe-Separation Distance Determination for Mass Fire Hazards.” Naval Air Warfare Center Weapons Division. March 2013.

West Fertilizer Company Final Report January 2016 257 Date Location Description Fire Explosion Quantity (lbs) Casualties Property Damage References 21-Sep- 2001 Toulouse, France Explosion occurred in warehouse containing FGAN and TGAN

x 400 – 600 K (TGAN+FGAN) • 29 fatalities • Nearly 2,500 injured, 30 of which severe Severe damage to plant and surrounding community 15 Jan- 2003 Cartagena, Murcia, Spain Fertilizer storage facility held self-sustained detonation fire x x

16 Oct- 2003 Saint-Romain- en-Jarez, France Fire occurred in end user storage facility containing FGAN in bags x x 10K Three heavily injured

17 30-Jul- 2009 Bryan, TX Fertilizer plant caught fire x

Over 80,000 evacuated

18

15 Nygaard, Erik C. et al. “Safety of Ammonium Nitrate.” International Society of Explosives Engineers. Vol. 2, 2006. See: https://miningandblasting.files.wordpress.com/2009/09/safety-of-ammonium-nitrate.pdf (accessed on January 4, 2016). 16 Boggs, Thomas L. et al. “Realistic Safe-Separation Distance Determination for Mass Fire Hazards.” Naval Air Warfare Center Weapons Division. March 2013. 17 Marlair, G., and M.A. Kordek. “Safety and security issues relating to low capacity storage of AN-based fertilizers.” Journal of Hazardous Materials 123(1–3) (2005): 13–28. 18 Boggs, Thomas L. et al. “Realistic Safe-Separation Distance Determination for Mass Fire Hazards.” Naval Air Warfare Center Weapons Division. March 2013.

West Fertilizer Company Final Report January 2016 258 Date Location Description Fire Explosion Quantity (lbs) Casualties Property Damage References 17-Apr- 2013 West, TX Fire and explosion occurred at fertilizer plant x x 80 – 100 K • 15 fatalities • Over 236 injured • Facility destroyed • Widespread damage to over 150 offsite buildings, including high school, middle school, intermediate school, apartment complex, and nursing home • Early estimates placed property damage at over $100 million

29-May- 2014 Athens, TX Fertilizer warehouse containing FGAN caught fire and burned x

19 12-Aug- 2015 Tianjin, China Hazardous materials storage warehouse containing AN* caught fire and exploded x x

Over 100 fatalities

20

19 Babrauskas, Vytenis. “Explosions of ammonium nitrate fertilizer in storage or transportation are preventable accidents.” Journal of Hazardous Materials (2015). 20 See: http://www.theguardian.com/world/2015/aug/18/tianjin-blasts-warehouse-handled-toxic-chemicals-without-licence-reports (accessed on January 19, 2016)

West Fertilizer Company Final Report January 2016 259 Table 18. Non-Stationary FGAN Incidents Date Location Description Fire Explosion Quantity (lbs) Casualties Property Damage References 16-Apr- 1947 Texas City, TX Fire occurred in hold of ship and detonated x x 4–11 million • Approximately 500 fatalities • Approximately 3,000 injured • 2,000 left homeless

• Commercial and residential buildings damaged or destroyed • Ships destroyed • Two planes knocked out of sky • Barge lifted out of water • Early property damage total estimated at approximately $40 million 21 23-Jan- 1953 Red Sea, Israel Spontaneous ignition of paper bags containing FGAN on ship x x 8–16 K

Ship destroyed 22 17-Dec- 1960 Traskwood, AR Explosion occurred in cars containing FGAN, petroleum, and paper x x 80—100 K

23

21 NFPA. “The Texas City Disaster.” The Quarterly. July 1947. 22 Oxley, J.C. et al. “AN: thermal stability and explosivity modifiers.” Thermochimica Acta 384 (2002): 23–45. 23 Ibid.

West Fertilizer Company Final Report January 2016 260 Date Location Description Fire Explosion Quantity (lbs) Casualties Property Damage References 1972 Taroon, Australia Transport of low density bagged AN prills involved in fire and explosion x x

Three fatalities

24 c. 1997 Brazil Delayed explosion occurred involving truck loaded with FGAN that caught fire due to nearby petrol tanker x x

25 c. 2000 FL Collision occurred between AN truck and gasoline tanker

x

26 18-Feb- 2004 Neyshabur, Khorasan, Iran Fire and explosion resulted from derailment of train containing bagged FGAN x x 840K 300 fatalities

27 Feb- 2004 Barracas, Spain Accident occurred during road transport of FGAN x x 50K • Two fatalities • Three injured

28

24 Marlair, G., and M.A. Kordek. “Safety and security issues relating to low capacity storage of AN-based fertilizers.” Journal of Hazardous Materials 123(1–3) (2005): 13–28. 25 Ibid. 26 Ibid. 27 Nygaard, Erik C. et al. “Safety of Ammonium Nitrate.” International Society of Explosives Engineers. Vol. 2, 2006. See: https://miningandblasting.files.wordpress.com/2009/09/safety-of-ammonium-nitrate.pdf (accessed on January 4, 2016). 28 Marlair, G., and M.A. Kordek. “Safety and security issues relating to low capacity storage of AN-based fertilizers.” Journal of Hazardous Materials 123(1–3) (2005): 13–28.

West Fertilizer Company Final Report January 2016 261 Date Location Description Fire Explosion Quantity (lbs) Casualties Property Damage References May- 2004 Near Bucharest, Romania Truck accident occurred during road transport of bagged FGAN x x 50K At least 18 fatalities

29 17-Feb- 2007 Estaca de Bares, Spain Self-sustained decomposition fire of nitrogen, phosphorous, potassium (NPK) fertilizer occurred in cargo of ship x

  1. 024

million (NPK)

30

29 Ibid. 30 Boggs, Thomas L. et al. “Realistic Safe-Separation Distance Determination for Mass Fire Hazards.” Naval Air Warfare Center Weapons Division. March 2013.

West Fertilizer Company Final Report January 2016 262 14.0 Appendix C: TFI Safety and Security Tools The Fertilizer Institute (TFI) offers a wide variety of tools designed to support the fertilizer industry. Most of these tools are information based and readily accessible online; some of the tools, however, are also interactive, allowing for personalization and customization. These tools include the following: • Access to a new online Compliance Assessment Tool. • General fertilizer retail industry information resources, such as industry fact sheets, fertilizer product fact sheets, and infographics. • New fertilizer grade ammonium nitrate (FGAN) guidelines, “Safety and Security Guidelines for the Storage and Transportation of Fertilizer Grade Ammonium Nitrate at Retail Facilities.” • An educational brochure, “America’s Security Begins with You,” designed to alert the agriculture community of the dangers associated with ammonium nitrate (AN) if it ends up in the wrong hands. • A brochure, “Health Effects of Ammonia,” discussing the sources and uses of ammonia as well as how the body processes it. • Newly updated liquid fertilizer guidelines, “Aboveground Storage Tanks Containing Liquid Fertilizer–Recommended Mechanical Integrity Practices,” which provides recommended uniform industry inspection and maintenance procedures for aboveground storage tanks of liquid fertilizer.1 • An anhydrous ammonia brochure, “Recommended Practices for Loading/Unloading Anhydrous Ammonia Rail Tank Cars in North America–Reduce and Eliminate Non-Accidental Release,” accompanied by an associated DVD. • Access to a new nonprofit organization, ResponsibleAg, an industry-led stewardship2 initiative founded to promote the public welfare by helping agribusinesses comply with safety and security rules regarding the handling and storage of fertilizer products.3 • Access to a multimedia safety training program, the “Anhydrous Ammonia Training Tour,” developed through TFI sponsorship of the Transportation Community Awareness and Emergency Response and focused on the provision of pertinent information regarding the properties of ammonia, steps that should be taken to ensure safe transport of ammonia, appropriate emergency response measures in case of an ammonia release, and hands-on training.4 • Access to free web-based anhydrous ammonia safety training, composed of subject-based training modules on (1) properties of ammonia, (2) personal protective equipment, (3) transportation of ammonia to and from the field, (4) safe hook-up of ammonia tanks in the field, and (5) emergency response and first aid procedures.5

1 See: http://www.tfi.org/safety-and-security-tools/recommended-mechanical-integrity-guidelines-aboveground- storage-tanks-liqu (accessed on December 30, 2015). 2 Merriam-Webster defines a stewardship as “the activity or job of protecting and being responsible for something.” 3 See: http://www.responsibleag.org/FAQ.cgi (accessed on December 30, 2015). 4 See: http://www.tfi.org/safety-and-security-tools/transcaer%C2%AE-anhydrous-ammonia-safety-training (accessed on December 30, 2015). 5 See: http://www.tfi.org/safety-and-security-tools/web-based-anhydrous-ammonia-safety-training (accessed on December 30, 2015).

West Fertilizer Company Final Report January 2016 263 • Access to a web-based compliance tool, myRMP Suite of Guidance Materials, a revised version of the Retail Guidance Document for Agricultural Retailers supported by the U.S. Environmental Protection Agency.6 • A new suite of second-generation web-based tools, mySPCC Suite of Guidance Materials Version 2.0, developed exclusively to assist agricultural retailers in implementing their Spill Prevention, Control, and Countermeasures (SPCC) plans, which enables the personalization of such plans to specific facilities and incorporates base information from the SPCC rule with accumulated knowledge gained by industry over the last 20 years.7

6 See: http://www.tfi.org/safety-and-security-tools/myrmp (accessed on December 30, 2015). 7 See: https://www.asmark.org/mySPCC/ (accessed on December 30, 2015).

West Fertilizer Company Final Report January 2016 264 15.0 Appendix D: ResponsibleAg As part of the ResponsibleAg program, participating facilities undergo an audit once every 3 years, and as many as 17 areas of a facility (e.g., dry fertilizer, liquid fertilizer, anhydrous ammonia, shop, office, and grounds) are assessed.1 Within 24 hours after completing the audit, the auditor enters findings into a secure portal on the ResponsibleAg website.2 Once the information is processed, the participating facility receives a corrective action plan if applicable, detailing any issues detected during the audit.3 This plan not only lists the issues discovered but also provides information on how to correct the issues and a recommended time frame for doing so.4 At the end of the recommended period of time, the auditor visits the facility again for a verification audit. The participating facility obtains certification only after all outstanding issues are addressed.5 To ensure a high level of reliability, a statistically valid sample of all participating facilities receives random verification from an independent auditor, approved by ResponsibleAg, every year.6 An annual accountability report includes the number of registered facilities, credentialed auditors, completed assessments, and random verifications.

1 See: http://www.responsibleag.org/About.cgi (accessed on December 30, 2015). 2 Ibid. 3 Ibid. 4 Ibid. 5 Ibid. 6 See: http://www.tfi.org/node/736 (accessed on January 6, 2016). See also: https://www.responsibleag.org/documents/RAHandout.pdf (accessed on December 30, 2015).

FD06458 | 2013_美国_West 肥料 爆炸 与 火灾 - West Fertilizer Explosion and Fire__最终报告.pdf

分类:06_境外及港澳台调查报告 | 年份:2013 | 地域: | 严重程度: | 场所: | 起火原因:燃气/爆炸 | 来源格式:pdf

U.S. Chemical Safety and Hazard Investigation Board

Rafael Moure-Eraso, Ph.D. Chairperson

Mark Griffon Board Member

Beth J. Rosenberg, ScD, MPH Board Member

May 17, 2013

The Honorable Barbara Boxer Chairman U.S. Senate Committee on Environment and Public Works 410 Dirksen Senate Office Building Washington, DC 20510

Dear Chairman Boxer:

Thank you for the opportunity to share information on the U.S. Chemical Safety Board’s (CSB’s) ongoing investigation into the tragic explosion and fire on April 17, 2013, at the West Fertilizer Company in West, Texas. I would also like to thank you for your ongoing support and interest in the CSB’s investigations and mission.

The CSB deployed a team of 18 investigators and other technical experts within 24 hours of the incident and has maintained a continuous presence in West. The sudden blast at West Fertilizer led to at least 14 fatalities, approximately 200 injuries, and widespread damage and destruction to the surrounding community. The damage to homes and apartments – as well as vulnerable facilities like schools and a nursing home – are the worst the CSB has ever seen from any chemical incident since we were established in 1998.

To summarize what is currently known about the incident: the disaster occurred at the West Fertilizer site after normal business hours, at about 8 p.m. on April 17. The facility was a small retail distribution center that served farmers in the surrounding community and had approximately 15 employees. No manufacturing occurred at the site, only blending of fertilizers for retail customers. Fertilizers such as ammonium nitrate and anhydrous ammonia were delivered to the site by rail car or truck. The ammonium nitrate, a granular solid, was stored in the facility’s fertilizer warehouse building in bins. Both the warehouse building itself and the bins were of combustible wooden construction, and the building also contained significant quantities of combustible materials such as seeds stored near the ammonium nitrate. Not only did the building lack fire protection systems such as automatic sprinklers, but current U.S. fire codes do not clearly require sprinklers in such buildings, leaving such decisions to the discretion of local authorities. Since the state of Texas and many Texas counties (including McLennan

U.S. Chemical Safety and Hazard Investigation Board

County where the West facility was located) have not adopted any mandatory fire code, it is not clear that sprinklers could have been required at West Fertilizer.

The incident began with a small fire that spread to involve the combustible materials surrounding the ammonium nitrate. Through an as-yet undetermined mechanism, this caused the ammonium nitrate to detonate with the force of multiple tons of TNT. First responders who were nearby were killed or severely injured, and the resulting shockwave damaged or destroyed buildings in a large area of West, including three public schools, an apartment block, and a nursing home.

We have received valuable cooperation in the investigation from West Fertilizer company personnel as well as the mayor and other civic leaders in West. We have also had exchanges of information with the fertilizer industry, including The Fertilizer Institute, which represents manufacturers and distributors of ammonium nitrate as well as many other fertilizer materials. We believe the industry is committed to learning from this incident and making any appropriate safety improvements.

The CSB is dedicated to providing a thorough public account of all the factors that led to this catastrophe. After a disaster of this scale, it is essential to pursue improved safety as we look toward the future. Here are our answers to the specific questions you asked in your April 30 letter.

Question 1: Please describe the CSB’s plans to investigate the explosion at the West facility, including the scope and timelines of the investigation.

The CSB will be examining many issues surrounding the explosion such as the safe storage and handling of ammonium nitrate, the siting of hazardous chemical facilities in proximity to vulnerable buildings and residences, and emergency responder safety. The investigation will examine the adequacy of national standards, industry practices, and regulations for the safe storage and handling of ammonium nitrate.

The CSB’s timeline for completion of its investigation is 12 – 18 months but we will seek to release preliminary findings, and possibly interim or urgent safety recommendations, as appropriate prior to the release of a final report. The investigation is occurring at time of many challenges for the agency, including a longstanding backlog of open investigations (related to a limited number of investigators on staff) and the impact of the current budget sequestration, which greatly constrains new hiring.

The CSB’s investigative team has identified a number of key areas of inquiry that we will pursue over the course of our investigation:

of ammonium nitrate (AN). Two prominent U.S. code organizations (the National Fire Protection Association and the International Code Council) have developed fire safety codes for AN. The CSB will examine the adequacy of these codes (such as NFPA 400) in light of the findings about this incident. The current codes discourage U.S. Chemical Safety and Hazard Investigation Board

the storage of combustibles near AN but have not incorporated recommendations from overseas regulators for measures such as dedicated, noncombustible storage buildings for AN.

  1. Application of fire codes to the West facility. As the CSB pointed out in a 2003

investigation of a major petroleum blending facility fire south of Houston, Texas has no statewide fire code and has adopted unusual provisions prohibiting many rural counties from adopting any fire code. As a result, the West facility was not legally required to follow either NFPA or ICC consensus fire codes related to ammonium nitrate storage.

  1. Hazardous facility siting, zoning and land use planning. The West Fertilizer site

had existed since at least the early 1960’s before the northern section of West was extensively developed. Over the ensuing years, numerous residences, a nursing home, a health care facility, several schools, athletic fields, and other facilities were constructed nearby the fertilizer site. The explosion destroyed buildings hundreds of feet away and caused significant damage to buildings as much as half a mile distant. Several fatalities occurred offsite in public or residential facilities. The CSB will examine how land use planning around hazardous facilities can be improved to better protect the public. The CSB will also conduct vulnerability assessments to seek to understand the potential “worst case” from an ammonium nitrate explosion near structures like schools. In West, the town’s Intermediate School was located only a few hundred feet from the site and was virtually destroyed; had children been present at the time of the explosion, the effects could have extremely severe. The fact there are several thousand retail fertilizer facilities across the country underscores the importance of these assessments.

  1. Ammonium nitrate detonation mechanisms. Catastrophic ammonium nitrate

explosions have occurred periodically around the world over the past hundred years. Scientific literature suggests that pure ammonium nitrate is difficult to detonate but can be sensitized by heating, shock, contamination, and/or confinement. The CSB will examine which of these factors may have contributed to the West explosion and how other facilities that store AN fertilizer should minimize the risk of an explosion.

  1. Inherently safety alternatives. The CSB has already began a dialogue with the

fertilizer industry and others to better understand the usage of AN fertilizer, which currently represents only about 2% of applied nitrogen fertilizer in the U.S. The CSB will examine whether other AN or nitrogen formulations could achieve the same benefit for farmers with a significantly reduced risk of explosion for storage sites.

  1. EPA Risk Management Program (RMP). Following the Bhopal disaster in India in

1984, Congress mandated in 1990 that EPA adopt a regulatory Risk Management Program (RMP) to prevent acute chemical catastrophes that would threaten the public. EPA’s final rule in 1996 imposed safety requirements for certain toxic and flammable substances but did not include reactive or explosive materials like AN. In 2002, the CSB recommended that EPA broaden the coverage under the RMP program

U.S. Chemical Safety and Hazard Investigation Board

to include hazardous reactive chemicals, of which AN is an example.1

  1. Emergency preparedness for chemical disasters. Numerous CSB investigations

around the country have highlighted community challenges in preparing for and responding to major chemical incidents. In 1986, Congress established a system to improve preparedness through state and local emergency planning committees, which were required to be set up across the country. However, this system has no federal funding mechanism and often relies on the services of volunteers and local committees that lack much real authority. The CSB will examine the efforts of West Fertilizer and community authorities to exchange information about the site’s hazards. EPA has not acted on the recommendation to broaden coverage, and as EPA Inspector General reports have noted the agency has also had difficulty providing resources and adequate inspections to enforce even the existing programs at thousands of hazardous facilities across the country. This issue should be revisited in light of the community devastation from the West explosion, as well as the ongoing occurrence of a significant number of other reactive incidents nationally.

  1. Firefighter training and hazard awareness. The extensive and tragic loss of life in

West – the incident killed ten responders along with two members of the public who were assisting the response – makes it important to look for opportunities to improve training materials and guidance for fighting fires that may involve ammonium nitrate. The CSB will review fire codes, DOT guidance for firefighters, and others materials that may guide responses to future AN fires.

Questions 2: Please provide a list and description of all recommendations you have made in the past relating to reducing risks at facilities that handle highly explosive and toxic materials and whether they have been adopted by government or industry Question 3: Please identify the recipients of these recommendations

The CSB identified a number of prior investigations that related to highly explosive or toxic materials, dating back to the CSB’s establishment in 1998. Most CSB reports include multiple recommendations designed to promote improved safety in the future. The attached table summarizes the recommendations from these reports, including the text, date of issue, and current status or date of closure. Across all of its investigations, the CSB has now achieved a favorable closure rate of approximately 72%, and this figure continues to increase. However, the CSB recognizes that certain key recommendations over the years – including the above-mentioned recommendations for strengthening the EPA Risk Management Program – continue to need further action.

Additional Relevant Issues and Challenges For the CSB’s West Investigation

The CSB considers the West explosion to be among the most serious U.S. chemical incidents affecting the public in many decades. We believe that an independent root-

1 The West Fertilizer facility was covered under the RMP program for its anhydrous ammonia but not for its ammonium nitrate. The ammonia was not directly involved in the explosion.

U.S. Chemical Safety and Hazard Investigation Board

cause investigation is therefore of the utmost priority. In addition the CSB is statutorily compelled to investigate the accident under its authorizing statute, due to the fatalities among members of the public. Although we remain hopeful of meeting the timeline and key objectives discussed above, we also note that the investigation has encountered very significant obstacles and challenges.

At the same time the CSB deployed its investigative team and associated fire and blast experts, the Justice Department’s Bureau of Alcohol, Tobacco, Firearms, and Explosives (ATF) mobilized a large “national response team” that assumed essentially exclusive control of the incident site in concert with Texas State Fire Marshal’s Office (SFMO) personnel. These criminal investigators have exercised exclusive control of the site for a full one-month period, from April 17, 2013, until today and have altered or removed almost all relevant physical evidence at the site. The ATF and SFMO consistently expressed the position that CSB was not permitted to conduct separate interviews, prepare expert analysis, or author its own independent report. The ATF and SFMO stated that because in their view this was exclusively a criminal investigation, there could be only one version of what occurred and one report.

During the critical period before the accident site was completely altered, CSB investigators were explicitly excluded from the site by ATF/SFMO and received only limited access days later. The CSB investigative leadership had no meaningful input into how the site was managed or what pieces of potential evidence were collected, altered, removed, destroyed, or discarded. Throughout this period, the incident site was massively and irreversibly altered by and under the direction of ATF personnel, who used cranes, bulldozers, and other excavation apparatus in an ultimately unsuccessful quest to find a single ignition source for the original fire. In a news statement on May 16, the ATF said that over the past month it has “spent approximately $500,000 in the rental of heavy equipment, which assisted in excavating the scene”2

– fully half the cost of their overall inquiry. In return for limited and unsatisfactory site access, the CSB had to agree to conduct no witness interviews, which form an integral and essential part of the CSB investigative process. This state of affairs with witness interviews continued for almost three weeks after the incident -- an unprecedented and harmful delay. On the morning of May 7, the CSB finally commenced its interview process with a knowledgeable plant employee who had already been interviewed multiple times by the ATF. As soon as the witness left his car near the CSB’s temporary offices in downtown West, he was suddenly surrounded by four armed ATF and SFMO agents and taken away for further ATF interrogation at an unknown location. This occurred without any explanation or prior notice to the CSB. Only after numerous protests and inquiries did the witness eventually reappear about four hours later.

2 http://www.atf.gov/press/releases/2013/05/051613-hou-atf-and-the-state-fire-marshals-office-conclude- scene-investigation-at-the-west-fertilizer-plant.html (Accessed May 17, 2013).

U.S. Chemical Safety and Hazard Investigation Board

Other troubling occurrences include the removal by ATF of chemical evidence from the site (such as residual ammonium nitrate masses that might show signs of how the material became sensitized to explosion). These actions followed a May 4 written agreement between the ATF and the CSB that explicitly provided the CSB with authority to take its own chemical samples. ATF further disregarded the May 4 agreement by denying site access to CSB personnel after May 13, including denying access to two presidentially appointed CSB board members.

Finally in announcing its departure from the site in a news conference on May 16, ATF officials called the incident of “undetermined” origin and proposed three possible ignition sources for the initial small fire: an electric fault, a golf cart, or an “intentional act.”3 In response to media questions, the state’s assistant fire marshal said the ATF/SFMO team would not release its collected evidence to the CSB because of what he termed the “ongoing criminal investigation.” This collected evidence, which remains unavailable, includes chemical samples, unique company documents that potential include chemical inventory information and safety records,4

debris objects collected from the site, and digital measurements of the AN explosion crater that the ATF obtained and then denied the CSB and other parties the right to obtain separately. The ATF then dug up the crater with heavy equipment, making duplication of the measurements impossible. Conclusion

The CSB is uniquely positioned to determine the root cause of major chemical accidents and to make safety recommendations that will assure greater safety at industrial facilities around the country. The April 17 explosion at West Fertilizer was a terrible tragedy and one of the worst chemical accidents in the U.S. in decades. We believe the CSB’s findings and safety recommendations will be important not only to the community of West, Texas, but also to similar facilities and communities across the country where ammonium nitrate or other hazardous substances are produced, stored, or distributed.

Due to the circumstances outlined above, whereby the CSB was precluded from obtaining key evidentiary materials currently in the possession of ATF, we would like to

3 We are not aware of any affirmative evidence of an intentional criminal act that led or contributed to the fire of explosion. All indications are that the event was an industrial accident within the CSB’s investigative jurisdiction. Although ATF personnel detained a West paramedic on illegal munitions charges on May 3, no evidence has surfaced linking him to the initiation of the incident. West municipal officials have stated they believe the incident was of accidental original and discounted any role of the paramedic. 4 During periods when they did have limited access to the site, CSB investigators observed unsecured company documents blowing around the site and exposed to rain and the elements. The ATF had no apparent interest in the documents, which the CSB observed included potentially unique records of chemicals stored or sold at the site. The CSB team pointed out this issue to ATF field personnel, and then the CSB chairperson raised the issue to U.S. Deputy Attorney General James Cole in a meeting in Washington, DC, on April 26, at which meeting the deputy attorney general and the chairperson pledged cooperation, preservation of evidence at West, and the ability for the CSB to conduct its independent statutory investigation. ATF later asserted the documents at West had been secured but has nonetheless refused to provide any copies to the CSB, and their current location is unknown.

U.S. Chemical Safety and Hazard Investigation Board

request your assistance in obtaining a number of specific items that remain under ATF/SFMO custody. They include but are not limited to:

• Continued access to the accident site • GIS mapping of the crater and GPS debris coordinates • Priority access to the physical evidence • Unique company documents including: o records of chemical inventories o safety records o employee training records o any other company documents • Debris collected from the site • Digital measurements of the AN explosion crater

To date the CSB has experienced significant obstacles that potentially compromise and delay our ability to complete the “comprehensive investigation” that you have rightly demanded, and that we would very much like to produce. We expect that with your support we can obtain the critical investigation data necessary to generate a valuable safety investigation that will provide clear, actionable recommendations to prevent the repetition of this tragedy.

Again, thank you for your continued support of the CSB’s mission and activities.

Sincerely,

Rafael Moure-Eraso, Ph.D., CIH Chairperson

FD06459 | 2013_美国_West 肥料 爆炸 与 火灾 - West Fertilizer Explosion and Fire__最终报告_3.pdf

分类:06_境外及港澳台调查报告 | 年份:2013 | 地域: | 严重程度: | 场所: | 起火原因:燃气/爆炸 | 来源格式:pdf

U.S. CHEMICAL SAFETY AND HAZARD INVESTIGATION BOARD INVESTIGATION REPORT FINAL WEST FERTILIZER COMPANY FIRE AND EXPLOSION (15 Fatalities, More Than 260 Injured) WEST FERTILIZER COMPANY WEST, TX KEY ISSUES: APRIL 17, 2013 • REGULATORY OVERSIGHT • HAZARD AWARENESS • EMERGENCY PLANNING AND RESPONSE • FERTILIZER GRADE AMMONIUM NITRATE STORAGE PRACTICES • LAND USE PLANNING AND ZONING REPORT 2013-02-I-TX

[This page intentionally left blank.]

West Fertilizer Company Final Report January 2016

Dedication This report is dedicated to the 12 emergency responders and 3 members of the public who lost their lives as a result of the explosion at the West Fertilizer Company on April 17, 2013.

Morris Bridges Perry Calvin Jerry Dane Chapman Cody Frank Dragoo Kenneth Harris Adolph Lander James Matus Judith Ann Monroe Joseph Pustejovsky Cyrus Adam Reed Mariano C. Saldivar Kevin William Sanders Douglas Snokhous Robert Snokhous William Uptmor, Jr.

West Fertilizer Company Final Report January 2016 1 U.S. CHEMICAL SAFETY AND HAZARD INVESTIGATION BOARD

Contents 1.0 EXECUTIVE SUMMARY ........................................................................................................... 13 1.1 Overview ........................................................................................................................................ 13 1.2 Federal and State Response ........................................................................................................... 14 1.2.1 Joint SFMO/ATF Investigation ........................................................................................ 14 1.2.2 CSB Response ................................................................................................................... 15 2.0 BACKGROUND ........................................................................................................................... 16 2.1 West Fertilizer Company ............................................................................................................... 16 2.1.1 Facility Operations Description ........................................................................................ 18 2.1.2 Facility Layout and Materials of Construction ................................................................. 23 2.1.3 Unloading of Fertilizer ...................................................................................................... 25 2.1.4 Housekeeping .................................................................................................................... 26 3.0 INCIDENT DESCRIPTION .......................................................................................................... 27 3.1 West Police Department ................................................................................................................ 27 3.2 West Volunteer Fire Department (WVFD) .................................................................................... 28 3.3 Abbott, Bruceville-Eddy, Mertens, and Navarro Mills Volunteer Fire Departments .................... 29 3.4 Consequences ................................................................................................................................. 30 3.4.1 Fatalities and Injuries ........................................................................................................ 30 3.4.2 Property Damage .............................................................................................................. 32 3.4.3 West Independent School District .................................................................................... 39 3.4.4 West Rest Haven Nursing Home ...................................................................................... 49 3.4.5 West Terrace Apartment Complex ................................................................................... 53 3.4.6 Private Residences ............................................................................................................ 54 3.4.7 Infrastructure Damage to the City of West ....................................................................... 55 4.0 INCIDENT ANALYSIS ................................................................................................................ 57 4.1 Fertilizer Grade Ammonium Nitrate (FGAN) ............................................................................... 57 4.1.1 The Fertilizer Industry ...................................................................................................... 57 4.1.2 FGAN Properties .............................................................................................................. 57 4.1.3 FGAN Hazards ................................................................................................................. 58 4.1.4 Previous Incidents Involving FGAN ................................................................................ 61 4.1.5 Historical Knowledge of FGAN Fire and Explosion Hazards .......................................... 62

West Fertilizer Company Final Report January 2016 2 U.S. CHEMICAL SAFETY AND HAZARD INVESTIGATION BOARD

  1. 2

Factors Contributing to the Massive Fire and Explosion at the WFC ........................................... 64 4.2.1 Contamination of the FGAN Pile ..................................................................................... 64 4.2.2 Heating and Ventilation .................................................................................................... 66 4.3 Detonation Scenarios ..................................................................................................................... 68 4.3.1 Scenario 1: Detonation from the Top of the FGAN Pile .................................................. 69 4.3.2 Scenario 2: Detonation in Heated FGAN Along Exterior Wall Exposed to Fire ............. 71 4.3.3 Scenario 3: Detonation in Elevator Pit That Spread to Main FGAN Bin ......................... 73 4.4 Forensic Testing of West Fertilizer Company Samples ................................................................. 73 4.5 Blast and Impact Analysis ............................................................................................................. 78 4.5.1 Seismic Data ..................................................................................................................... 81 5.0 COMMERCIAL PROPERTY AND LIABILITY INSURANCE ................................................. 82 5.1 Triangle Insurance Coverage and Audits (2006–2010) ................................................................. 83 5.1.1 Triangle Loss Control Surveys That Did Not Include FGAN Hazards ............................ 86 5.2 U.S. Fire Insurance Coverage and Audits (2010–2013) ................................................................ 86 5.3 Insurance Claims and Other Aid after the Explosion .................................................................... 87 5.4 FGAN Facilities in Texas and the Potential for Offsite Consequences ......................................... 88 5.5 Limits of Insurance Coverage in Texas ......................................................................................... 90 5.6 Insurance Services Office Rating ................................................................................................... 94 5.6.1 Impact of the City of West Class 5 ISO Rating on the West Fertilizer Company ............ 95 6.0 INHERENTLY SAFER TECHNOLOGY ..................................................................................... 97 6.1 Alternative Formulations of FGAN ............................................................................................... 99 6.2 Inherently Safe Building Design and Storage .............................................................................. 102 7.0 EMERGENCY RESPONSE ........................................................................................................ 104 7.1 Firefighter Response .................................................................................................................... 105 7.2 Key Contributing Factors to Emergency Responders’ Fatality ................................................... 107 7.2.1 Lack of Incident Command System ................................................................................ 107 7.2.2 Lack of Established Incident Management System ........................................................ 108 7.2.3 Firefighter Training ......................................................................................................... 110 7.2.4 Firefighter FGAN Knowledge and Lack of HAZMAT Training ................................... 112 7.2.5 Lack of Situational Awareness and Risk Assessment Knowledge ................................. 116 7.2.6 Lack of Pre-Incident Planning at Facility ....................................................................... 117 7.3 Limited and Conflicting Technical Guidance on FGAN ............................................................. 119

West Fertilizer Company Final Report January 2016 3 U.S. CHEMICAL SAFETY AND HAZARD INVESTIGATION BOARD

  1. 3.1

Emergency Response Guidebook ................................................................................... 120 7.3.2 Safety Data Sheets .......................................................................................................... 125 7.4 Lessons Not Learned and Lessons Learned ................................................................................. 127 7.4.1 Pre-West-Incident FGAN-Related Fires and Explosions: Lessons Not Learned ........... 127 7.4.2 Post-West Incident FGAN-Related Fire: Lessons Learned ............................................ 131 7.5 Other Post-Incident Investigation Reports Related to Firefighting .............................................. 136 7.5.1 Texas State Fire Marshal’s Office (SFMO) .................................................................... 136 7.5.2 NIOSH Findings and Recommendations ........................................................................ 137 7.6 Summary of Incident Emergency Response ................................................................................ 138 7.7 Firefighter Training Grants and Programs ................................................................................... 139 7.7.1 Need for Training ............................................................................................................ 139 7.7.2 National Firefighter Training Funds and Programs ........................................................ 142 7.7.3 National Membership Firefighter Associations .............................................................. 163 8.0 REGULATORY ANALYSIS ...................................................................................................... 164 8.1 President Obama’s Executive Order 13650 ................................................................................. 164 8.2 OSHA Explosives and Blasting Agents Standard ........................................................................ 165 8.2.1 OSHA Issuance of Guidance on Explosives and Blasting Agents Standard .................. 171 8.2.2 Need for an Emphasis Program ...................................................................................... 173 8.3 Chemical Facility Anti-Terrorism Standards (CFATS) ............................................................... 173 8.3.1 AN Screening Thresholds ............................................................................................... 174 8.4 Safety Management Programs ..................................................................................................... 176 8.4.1 OSHA Process Safety Management Standard ................................................................ 176 8.4.2 EPA Risk Management Program Rule ........................................................................... 183 8.5 Emergency Planning .................................................................................................................... 195 8.5.1 Federal Emergency Planning .......................................................................................... 196 8.5.2 State Emergency Planning in the State of Texas ............................................................ 199 8.5.3 City Emergency Planning in the City of West ................................................................ 200 8.5.4 Other Emergency Planning Requirements ...................................................................... 204 8.6 Fire Protection Codes and Standards ........................................................................................... 205 8.6.1 National Fire Protection Association .............................................................................. 206 8.6.2 International Code Council ............................................................................................. 209 8.6.3 State Fire Codes .............................................................................................................. 210

West Fertilizer Company Final Report January 2016 4 U.S. CHEMICAL SAFETY AND HAZARD INVESTIGATION BOARD

  1. 7

Post-Incident State and Local Regulatory Developments ............................................................ 213 8.7.1 Texas Commercial Fertilizer Rules ................................................................................ 214 8.7.2 Texas House Bill 942 ...................................................................................................... 214 8.7.3 Athens City Ordinance .................................................................................................... 215 8.8 Industry Standards ....................................................................................................................... 216 8.8.1 The Fertilizer Institute (TFI) ........................................................................................... 216 8.8.2 Agricultural Retailers Association (ARA) ...................................................................... 218 8.8.3 Product Stewardship ....................................................................................................... 218 8.8.4 Efforts to Address FGAN Hazards Post-Incident ........................................................... 220 9.0 LAND USE .................................................................................................................................. 223 9.1 Land Use Planning: An Introduction ........................................................................................... 223 9.2 The City That “Came to” the WFC Over the Years .................................................................... 224 9.3 Lack of Zoning Regulations ......................................................................................................... 227 9.3.1 Importance of Land Use Planning in Siting Communities Near Facilities Storing FGAN and Other Hazardous Chemicals ..................................................................................... 233 9.3.2 International Perspectives ............................................................................................... 234 9.4 Efforts to Address Land Use Planning After the West Incident .................................................. 239 10.0 KEY FINDINGS .......................................................................................................................... 240 11.0 RECOMMENDATIONS ............................................................................................................. 242 12.0 APPENDIX A: REBUILDING OF THE WEST INDEPENDENT SCHOOL DISTRICT ........ 250 13.0 APPENDIX B: FGAN INCIDENTS TABLES ........................................................................... 252 14.0 APPENDIX C: TFI SAFETY AND SECURITY TOOLS .......................................................... 262 15.0 APPENDIX D: RESPONSIBLEAG ............................................................................................ 264

West Fertilizer Company Final Report January 2016 5 U.S. CHEMICAL SAFETY AND HAZARD INVESTIGATION BOARD

Figures Figure 1. 2013 Overview of WFC Facility (Source: Bing Maps) ............................................................... 18 Figure 2. Grain Silos (Source: WFC Insurer) ............................................................................................. 19 Figure 3. West View of Fertilizer Building (Source: Bing Maps) .............................................................. 20 Figure 4. Fertilizer Building Overview (Source: Atlas Engineering) ......................................................... 21 Figure 5. Southwest View from Northeast Corner of Fertilizer Building (Source: WFC Insurer) ............. 21 Figure 6. Anhydrous Ammonia Storage (Source: WFC Insurer) ............................................................... 22 Figure 7. West View from East of Fertilizer Building (Source: WFC Insurer) .......................................... 23 Figure 8. Plywood Bin Wall, Post-Explosion (Source: CSB) ..................................................................... 24 Figure 9. Elevator System Recovered from Blast Debris (Source: CSB) ................................................... 25 Figure 10. Video Stills of WFC Fire and Explosion (Source: Member of the Public) ............................... 30 Figure 11. Number of Nonfatal Injuries, by Injury Type (Source: Waco-McLennan County Public Health District) ..................................................................................................................................... 31 Figure 12. Overview of Damage to WFC Facility (Source: Texas Civil Air Patrol) .................................. 33 Figure 13. Damaged WVFD Water Tender (Source: ABS Consulting) ..................................................... 34 Figure 14. Farm Truck South of Crater, Near the Scale House (Source: ABS Consulting) ....................... 34 Figure 15. Railcar Loaded with FGAN, Destroyed and Overturned by Explosion (Source: CSB) ............ 35 Figure 16. Liquid Fertilizer Tank Damage (Source: CSB) ......................................................................... 35 Figure 17. Anhydrous Ammonia Pressure Vessels (Source: CSB) ............................................................ 36 Figure 18. Damaged Railroad Tracks Adjacent to WFC Facility (Source: CSB) ....................................... 37 Figure 19. Damaged Playground Equipment (Source: ABS Consulting) ................................................... 37 Figure 20. Damaged Basketball Goal Post at Park (Source: ABS Consulting) .......................................... 38 Figure 21. Anhydrous Ammonia Tank PRV, Post-Incident (Source: CSB) ............................................... 39 Figure 22. Proximity of WFC Facility to Schools and Other Public Structures (Source: Google Earth) ... 40 Figure 23. WIS Room Layout in Evacuation Plan (Source: CSB) ............................................................. 42 Figure 24. WIS North Hallway, Looking Toward Northeast Exit Door (Source: ABS Consulting) .......... 43 Figure 25. Glazing Hazard in WIS Room 12 (Source: ABS Consulting) ................................................... 43 Figure 26. Embedded Glass in Assignment Poster in WIS Room 12 (Source: ABS Consulting) ............. 44 Figure 27. Interior of Burned Northeast Section of WIS (Source: ABS Consulting) ................................ 44 Figure 28. WIS Gymnasium (Source: ABS Consulting) ............................................................................ 45 Figure 29. WIS Classroom 20 (Source: ABS Consulting) .......................................................................... 46 Figure 30. WHS Evacuation Map (Source: WISD) .................................................................................... 47

West Fertilizer Company Final Report January 2016 6 U.S. CHEMICAL SAFETY AND HAZARD INVESTIGATION BOARD

Figure 31. WMS Layout (Source: Bing Maps) ........................................................................................... 48 Figure 32. Classroom Annex Interior Hallway and Ceiling Damage at WMS (Source: ABS Consulting) 49 Figure 33. Damage to Reagan Street Entry of West Rest Haven (Source: ABS Consulting) ..................... 50 Figure 34. Emergency Exit Floor Plan for the West Rest Haven (Source: CSB) ....................................... 52 Figure 35. Crater and Debris (left) from Fragment (right) of WFC Facility Foundation that Impacted West Rest Haven (Source: ABS Consulting) ..................................................................................... 53 Figure 36. West Terrace Apartment Complex East Façade (Source: CSB) ................................................ 54 Figure 37. Example of Damage to Single-Family Residential Structure (Source: ABS Consulting) ......... 55 Figure 38. Initial Light Smoke (left) Followed by Dark Plume (right) (Source: Member of the Public) .. 65 Figure 39. Dark and Heavy Smoke, Rich in Soot (Source: Member of the Public) .................................. 66 Figure 40. Photographs from 7:42 pm (left) and 7:45 pm (right), Showing Transition to Lighter Smoke and Larger Flame, Before Detonation at Approximately 7:51 pm (Source: Member of the Public) ....................................................................................................................................... 67 Figure 41. Plume of Smoke from AN Fire in Bryan, Texas (Source: College Station Fire Department).. 68 Figure 42. Potential Explosive Train Layers on AN Pile Before Detonation (Source: CSB) ..................... 70 Figure 43. North Side of Structure Approximately 3 Minutes Before Detonation, with Dark Foreground Objects Associated with the Bin Complex North of Fertilizer Building (Source: Member of the Public) ....................................................................................................................................... 72 Figure 44. Solidified Fertilizer Collected from WFC Property (Approximate Location Unknown) (Source: Forensic Laboratory) ................................................................................................................. 75 Figure 45. FGAN Prills Collected from a Railcar on WFC Property (Source: Forensic Laboratory) ........ 75 Figure 46. Farmer’s Sample of FGAN and AS Blend (Source: Forensic Laboratory) ............................... 75 Figure 47. Physical Comparison of Samples (20x) (Source: Forensic Laboratory) ................................... 77 Figure 48. Ground-Level View of WFC Explosion Crater (Source: CSB) ................................................ 79 Figure 49. WFC Explosion Crater Profile Measurements (Source: Army Corps of Engineers) ................ 80 Figure 50. Overhead View of WFC Bins, with Crater Underlay (Source: Atlas Engineering) .................. 81 Figure 51. Elevation View of Fertilizer Building, with Crater Depth (Source: Atlas Engineering) ........... 81 Figure 52. Data Recorded at Lake Whitney Station, WHTX, and Seismograph by the USGS National Earthquake Information Center (Source: USGS) ...................................................................... 82 Figure 53. Exposed 440-Volt Electrical Wiring Identified in 2007 Survey (Source: Triangle Insurance Company) .................................................................................................................................. 84 Figure 54. Damaged Electrical Cord Identified in 2008 Insurance Survey (Source: Triangle Insurance Company) .................................................................................................................................. 85 Figure 55. Overhead View of a School Approximately 529 Feet from an FGAN Storage Facility (Source: Google Earth) ............................................................................................................................ 89

West Fertilizer Company Final Report January 2016 7 U.S. CHEMICAL SAFETY AND HAZARD INVESTIGATION BOARD

Figure 56. Breakdown of FGAN Storage Facilities (10,000 pounds or more) Within 1 Mile of a Texas School (Source: CSB) ............................................................................................................... 89 Figure 57. Overhead View of a Texas FGAN Storage Facility near a Hospital, Residence, and School (Source: Google Earth) ............................................................................................................. 90 Figure 58. Distribution of ISO Class Ratings for Cities and Communities in Texas (Source: ISO) .......... 95 Figure 59. Distribution of ISO Class Ratings for All U.S. Cities and Communities (Source: ISO) ........... 96 Figure 60. Risk Control Hierarchy (Source: CCPS) ................................................................................... 98 Figure 61. Reconstructed EDC Facility in Bryan, Texas (Source: CSB) ................................................. 104 Figure 62. Timeline of Events for Emergency Response to WFC Facility (Source: CSB) ....................... 106 Figure 63. Cover Page of 2012 Edition of ERG (Source: DOT PHMSA) ................................................ 121 Figure 64. Cover Page of 2016 Edition of ERG (Source: DOT PHMSA) ................................................ 124 Figure 65. Post-Incident Aerial View of EDC Facility Wooden Fertilizer Warehouse (Source: Bryan- College Station Eagle) ............................................................................................................ 130 Figure 66. Dark Grey Smoke Originating from East Texas Ag Supply Facility in Downtown Athens, Texas (Source: Athens Fire Department) ................................................................................ 133 Figure 67. Dark Smoke Combined with Flames at East Texas Ag Supply Facility in Athens, Texas (Source: Athens Fire Department) .......................................................................................... 134 Figure 68. East Texas Ag Supply Facility’s Masonry Brick Walls, Engulfed by Fire and Smoke (Source: Athens Fire Department) ......................................................................................................... 135 Figure 69. Comparison of Volunteer and Career Firefighter Deaths (1977–2013) (Source: NFPA) ....... 141 Figure 70. Assistance to Firefighter Grant Program Recipients in Texas (Source: FEMA) ..................... 147 Figure 71. SAFER Grant Award Recipients in Texas (Source: FEMA) .................................................. 148 Figure 72. FP&S Grant Recipients in Texas (Source: FEMA) ................................................................. 148 Figure 73. Percentage of AN Storage Facilities by Industry (Source: DHS) ............................................ 175 Figure 74. Progressive Development of West (Source: GeoSearch) ........................................................ 226 Figure 75. Aerial Photographs of the WFC Facility Before (left) and After (right) the Incident (Source: NBC News) ............................................................................................................................. 227

Tables Table 1. WFC Fertilizer Inventory in April 2013 ...................................................................................... 16 Table 2. Estimated Number of Students and Staff During School Hours .................................................. 41 Table 3. Infrastructure Repaired with FEMA Funding .............................................................................. 55 Table 4. Forensic Testing Results of Fertilizer Samples Collected from the WFC and the OTSC ............ 76 Table 5. Minimum Insurance Requirements in Texas ................................................................................ 92

West Fertilizer Company Final Report January 2016 8 U.S. CHEMICAL SAFETY AND HAZARD INVESTIGATION BOARD

Table 6. Inherently Safer Approaches for Handling FGAN ....................................................................... 98 Table 7. Examples of AN Fertilizer Alternatives...................................................................................... 100 Table 8. Training and Experience Information of the Fatally Injured Firefighters ................................... 112 Table 9. Comparison of Various AN-Related Firefighting Measures in April 2013 ................................ 126 Table 10. Funds Allocated to WVFD through the Rural VFD Assistance Program ................................ 158 Table 11. OSHA 29 CFR 1910.109(i) Citation History ............................................................................ 169 Table 12. CSB Investigations Involving Reactive Chemicals Since 2002 ............................................... 192 Table 13. EPCRA Chemicals and Reporting Thresholds ......................................................................... 196 Table 14. Relevant Siting Regulations ...................................................................................................... 228 Table 15. Investigations Involving Land Use Issues ................................................................................ 233 Table 16. Distribution of Grade Levels at the Old and New WISD Schools ............................................ 251 Table 17. FGAN Incidents at Stationary Sites .......................................................................................... 254 Table 18. Non-Stationary FGAN Incidents .............................................................................................. 259

West Fertilizer Company Final Report January 2016 9 U.S. CHEMICAL SAFETY AND HAZARD INVESTIGATION BOARD

Acronyms and Abbreviations

°C degrees Celsius °F degrees Fahrenheit AC air conditioning AFG Assistance to Firefighters Grant AHJ Authority Having Jurisdiction AN ammonium nitrate ANFO ammonium nitrate/fuel oil ANSI American National Standards Institute API American Petroleum Institute ARA Agricultural Retailers Association AS ammonium sulfate ATF Bureau of Alcohol, Tobacco, Firearms and Explosives CDC Centers for Disease Control and Prevention CDP Center for Domestic Preparedness CDT central daylight time CEPP Chemical Emergency Preparedness Program CERCLA Comprehensive Environmental Response, Compensation, and Liability Act CFATS Chemical Facility Anti-Terrorism Standards CFR Code of Federal Regulations CMU concrete masonry unit COI chemical of interest CSAT Chemical Security Assessment Tool CSB U.S. Chemical Safety and Hazard Investigation Board CTG Continuing Training Grant DHS U.S. Department of Homeland Security DOL U.S. Department of Labor DOT U.S. Department of Transportation DWC Division of Workers’ Compensation EDT eastern daylight time EHS extremely hazardous substance EMPG Emergency Management Performance Grant EMS emergency medical services EMT emergency medical technician

West Fertilizer Company Final Report January 2016 10 U.S. CHEMICAL SAFETY AND HAZARD INVESTIGATION BOARD

EO Executive Order EPA U.S. Environmental Protection Agency EPCRA Emergency Planning and Community Right-to-Know Act ERDC Engineer Research and Development Center ERG Emergency Response Guidebook ERP Emergency Response Plan EU European Union FAST firefighter assist and search team FEMA Federal Emergency Management Agency FFFIPP Fire Fighter Fatality Investigation and Prevention Program FGAN fertilizer grade ammonium nitrate FP&S Fire Prevention and Safety FR Federal Register FRS Facility Registry Service g/cm3 grams per cubic centimeter GAO U.S. Government Accountability Office GPD Grant Programs Directorate HAZMAT hazardous material HAZWOPER Hazardous Waste Operations and Emergency Response HCS Hazard Communication Standard HUD U.S. Department of Housing and Urban Development HSE UK Health and Safety Executive HSNTP Homeland Security National Training Program HVAC heating, ventilation, and air conditioning IAFC International Association of Fire Chiefs IAFF International Association of Fire Fighters IAP Incident Action Plan IBC International Building Code IC incident commander ICC International Code Council ICS Incident Command System ICT Insurance Council of Texas IFC International Fire Code IME Institute of Makers of Explosives ISO Insurance Services Office

West Fertilizer Company Final Report January 2016 11 U.S. CHEMICAL SAFETY AND HAZARD INVESTIGATION BOARD

IST inherently safer technology K-Mag potassium magnesium LEPC Local Emergency Planning Committee LNG liquefied natural gas MOU memorandum of understanding MSDS Material Safety Data Sheet NAICS North American Industry Classification System NEIC National Earthquake Information Center NERRTC National Emergency Response and Rescue Training Center NEW net explosive weight NFA National Fire Academy NFPA National Fire Protection Association NIMS National Incident Management System NIOSH National Institute for Occupational Safety and Health NOX nitrogen oxide NPD National Preparedness Directorate NTED National Training and Education Division NVFC National Volunteer Fire Council NYC New York City OSHA Occupational Safety and Health Administration OTSC Office of the Texas State Chemist PHMSA Pipeline and Hazardous Materials Safety Administration PPC Public Protection Classification PPE personal protective equipment PRV pressure relief valve PSI pounds per square inch PSM Process Safety Management (standard) PVC polyvinyl chloride Q&A question and answer RCRA Resource Conservation and Recovery Act RDPC Rural Domestic Preparedness Consortium RFI request for information RMP Risk Management Plan SAA State Administrative Agency SAFER Staffing for Adequate Fire and Emergency Response

West Fertilizer Company Final Report January 2016 12 U.S. CHEMICAL SAFETY AND HAZARD INVESTIGATION BOARD

SARA Superfund Amendments and Reauthorization Act SBA Small Business Administration SDS Safety Data Sheet SERC State Emergency Response Commission SFFMA State Firefighters’ and Fire Marshals’ Association SFMO State Fire Marshal’s Office SIC Standard Industrial Classification SOP standard operating procedure SPCC spill prevention, control, and countermeasures TAC Texas Administrative Code TCEQ Texas Commission on Environmental Quality TCFP Texas Commission on Fire Protection TDI Texas Department of Insurance TEEX Texas A&M Engineering Extension Service TFI The Fertilizer Institute TGAN technical grade ammonium nitrate TIESB Texas Industrial Emergency Services Board TNT Trinitrotoluene TR technical report TRANSCAER Transportation Community Awareness and Emergency Response TRI Toxics Release Inventory TX Texas U.K. United Kingdom USFA U.S. Fire Administration USGS U.S. Geological Survey VFD volunteer fire department WFC West Fertilizer Company WFD West Fire Department WIS West Intermediate School WISD West Independent School District WMS West Middle School WVFD West Volunteer Fire Department

West Fertilizer Company Final Report January 2016 13 U.S. CHEMICAL SAFETY AND HAZARD INVESTIGATION BOARD

  1. 0 Executive Summary
  2. 1 Overview

On April 17, 2013, a fire and explosion occurred at the West Fertilizer Company (WFC), a fertilizer blending, retail, and distribution facility in West, Texas. The violent detonation fatally injured 12 emergency responders and three members of the public. Local hospitals treated more than 260 injured victims, many of whom required hospital admission. The blast completely destroyed the WFC facility and caused widespread damage to more than 150 offsite buildings. The WFC explosion is one of the most destructive incidents ever investigated by the U.S. Chemical Safety and Hazard Investigation Board (CSB) as measured by the loss of life among emergency responders and civilians; the many injuries sustained by people both inside and outside the facility fenceline; and the extensive damage to residences, schools, and other structures. Following the explosion, WFC filed for bankruptcy. The explosion happened at about 7:51 pm central daylight time (CDT), approximately 20 minutes after the first signs of a fire were reported to the local 911 emergency response dispatch center. Several local volunteer fire departments responded to the facility, which had a stockpile of between 40 and 60 tons (80,000 to 120,000 pounds) fertilizer grade ammonium nitrate (FGAN), not counting additional FGAN not yet offloaded from a railcar. More than half of the structures damaged during the explosion were demolished to make way for reconstruction. The demolished buildings include an intermediate school (552 feet southwest of the facility), a high school (1,263 feet southeast), a two-story apartment complex with 22 units (450 feet west) where two members of the public were fatally injured, and a 145-bed nursing home (500 feet west) where many of the seriously injured civilians resided. A middle school (2,000 feet southwest) also sustained serious but reparable damage. Section 3 describes the incident and its consequences in detail. The CSB investigated the factors that contributed to the detonation of FGAN. Section 4 describes the properties of FGAN and posits three scenarios that could lead to its detonation under the conditions present during the WFC fire. CSB concluded that the construction of the bins and other building materials as well as the lack of an automatic sprinkler system plausibly contributed to the detonation. Section 6 describes inherently safer approaches to FGAN use and storage that reduce the risk of an FGAN detonation. The total insurance-related losses from the explosion are estimated to be around $230 million and federal disaster assistance is estimated to exceed $16 million. WFC was only insured for $1 million, which fell far short of the incident’s damage. Section 5 presents CSB’s analysis of the policies and regulations that led to this as well as to the failure of the insurer to identify the risks posed by FGAN. A few years prior to the incident, WFC was dropped by one insurer for failing to address safety concerns identified in loss control surveys. The company that insured WFC at the time of the incident did not appear to have conducted its own safety inspections of the facility.

West Fertilizer Company Final Report January 2016 14 U.S. CHEMICAL SAFETY AND HAZARD INVESTIGATION BOARD

CSB’s analysis of the emergency response, found in Section 7, concludes that the West Volunteer Fire Department did not conduct pre-incident planning or response training at WFC, was likely unaware of the potential for FGAN detonation, did not take recommended incident response actions at the fire scene, and did not have appropriate training in hazardous materials response. CSB found several shortcomings in federal and state regulations and standards that could reduce the risk of another incident of this type. These include the Occupational Safety and Health Administration’s Explosives and Blasting Agents and Process Safety Management standards, the Environmental Protection Agency’s Risk Management Program and Emergency Planning and Community Right-to-Know Act, and training provided or certified by the Texas Commission on Fire Protection and the State Firefighters’ and Fire Marshals’ Association of Texas. CSB’s complete analysis is presented in Section 8. The location of the WFC relative to the surrounding community exacerbated the offsite consequences, leading CSB to assess whether other FGAN storage facilities could pose significant offsite risks. CSB’s analysis shows that the risk to the public from a catastrophic incident exists at least within the state of Texas, if not more broadly. For example, 19 other Texas facilities storing more than 10,000 pounds of FGAN are located within 0.5 miles of a school, hospital, or nursing home, raising concerns that an incident with offsite consequences of this magnitude could happen again. Section 9 explores the connection between land use planning and offsite consequences. 1.2 Federal and State Response In response to this incident, President Barack Obama issued Executive Order (EO) 13650, “Improving Chemical Facility Safety and Security” to coordinate federal actions to reduce the risks of another incident of this type.1 Details and updates on the status of the EO are included in Section 8.1. Early investigation activities focused on law enforcement efforts to determine if there was a criminal element to the incident. Responding governmental agencies included the U.S. Bureau of Alcohol, Tobacco, Firearms and Explosives (ATF) National Response Team, Texas State Fire Marshal’s Office (SFMO), U.S. Occupational Safety and Health Administration (OSHA), Texas Commission on Environmental Equality, U.S. Federal Emergency Management Agency (FEMA), and U.S. Environmental Protection Agency (EPA). In addition, multiple state and local law enforcement and emergency response organizations responded to the scene. 1.2.1 Joint SFMO/ATF Investigation Immediately following the incident, ATF deployed to West at the invitation of SFMO and assumed control of the WFC site to conduct a joint investigation of the immediate cause and origin of the fire and explosion and determine whether the initiating fire was intentionally set. The two agencies retained

1 Executive Order 13650. “Improving Chemical Facility Safety and Security,” August 1, 2013. See: https://www.whitehouse.gov/the-press-office/2013/08/01/executive-order-improving-chemical-facility-safety-and- security (accessed on December 8, 2015).

West Fertilizer Company Final Report January 2016 15 U.S. CHEMICAL SAFETY AND HAZARD INVESTIGATION BOARD

control of the scene for about four weeks, interviewing witnesses, excavating the WFC site, and reconstructing the electrical system. To date, law enforcement has not made a final determination of the cause of the fire and ensuing explosion. Three possible scenarios remain under consideration: (1) faulty electrical wiring, (2) short circuit in an electrical golf cart, and (3) intentional act of arson.2 1.2.2 CSB Response CSB investigators from both the Washington, DC, and Denver, Colorado, offices deployed on April 18, 2013, supported by a contingent of contractors that included blast modeling, structural, urban search and rescue, and fire and explosion experts. The joint ATF-SFMO control of the site as a crime scene limited CSB site access and delayed CSB investigator execution of evidence-gathering protocols, chemical testing, and witness interviews. Despite the limited access in the initial stages, driven by the criminal investigation, CSB continued with its investigation. The investigation of the WFC incident analyzed several root causes and considered multiple contributing causes. Investigative teams partnered with urban search and rescue experts and fire and explosion consultants to survey damage to residences, schools, the nursing home, and other structures. The teams also conducted interviews with eyewitnesses, WFC managers, and hourly workers and gathered physical evidence for further laboratory testing and analysis. Key Findings The CSB’s analysis includes findings on the technical causes of the fire and explosion; regulatory changes that could have resulted in safety enhancements to the facility; the failure of the insurer to conduct safety inspections or provide an adequate level of coverage; shortcomings in emergency response, including pre-incident planning or response training of the volunteer fire fighters; and deficiencies in land use planning that permitted the City of West to encroach upon the WFC over the years. Section 10 presents the CSB’s key findings on the WFC incident. Recommendations As a result of the investigation of the WFC fire and explosion, CSB developed recommendations and directed them to the following recipients: • Environmental Protection Agency (EPA). • Occupational Safety and Health Administration (OSHA), U.S. Department of Labor. • Federal Emergency Management Agency (FEMA), U.S. Department of Homeland Security. • International Codes Council. • Texas Department of Insurance. • Texas Commission on Fire Protection. • State Firefighters’ and Fire Marshals’ Association of Texas. • Texas A&M Engineering Extension Services (TEEX).

2 See: http://www.tdi.texas.gov/news/2013/news201320.html (accessed on December 22, 2015).

West Fertilizer Company Final Report January 2016 16 U.S. CHEMICAL SAFETY AND HAZARD INVESTIGATION BOARD

• El Dorado Chemical Company (EDC). • West Volunteer Fire Department (WVFD).

Section 11 contains the complete set of recommendations. 2.0 Background 2.1 West Fertilizer Company The West Fertilizer Company (WFC) was located in the city of West, Texas. The city is approximately 80 miles south of Dallas, Texas, and has a population of about 2,800.3 The WFC stored and distributed fertilizers, chemicals, grains, and various other farming supplies. At the time of the incident, stockpiles of about 40 to 60 tons of FGAN were estimated to be onsite, and about 30 tons detonated. Table 1 shows the WFC inventory at the time of the explosion and fire. Table 1. WFC Fertilizer Inventory in April 2013 Fertilizer Name Amount (in tons) FGAN (fertilizer building) 40 to 60 FGAN (railcar) 100 Anhydrous ammonia 17 Potash4 45 Diammonium phosphate5 70 Diammonium phosphate and potash 25 Ammonium sulfate6 60 to 70 Zinc sulfate7 17.5

The fertilizer building was constructed in 1961, and business operations started in 1962. Photographs from 1972 show the closest residence about 265 feet from the WFC property. In addition, a baseball field

3 The 2010 U.S. Census data indicate that the population of West, Texas, is 2,807. See: http://www.census.gov/2010census/popmap/ (accessed on December 8, 2015). 4 Potash is an agricultural fertilizer and is a source of soluble potassium (K). 5 Diammonium phosphate (DAP), (NH4)2HPO4, is one of a series of water-soluble ammonium phosphate salts that can be produced when ammonia reacts with phosphoric acid. 6 Ammonium sulfate, (NH4)2SO4, is an inorganic salt with a number of commercial uses. The most common use is as a soil fertilizer. 7 Zinc sulfate, ZnSO4, is an inorganic compound and is a colorless solid that is a common source of soluble zinc ions.

West Fertilizer Company Final Report January 2016 17 U.S. CHEMICAL SAFETY AND HAZARD INVESTIGATION BOARD

was 58 feet from the property. In 1972, the town nursing home and the nearest group of homes were constructed about 500 feet away.8 Over the years, growth in the city of West led to the development of land closer to the WFC property line, including a park (less than 150 feet), an apartment complex, the nearest aggregation of homes (about 370 feet), West Intermediate School (a little more than 200 feet), and West High School (about 500 feet). Sections 3.4.2 through 3.4.7 provide additional details on the property damage resulting from the explosion.9 Figure 1 shows the WFC facility before the fire and explosion in relation to the nearby community, including details on the site and the location of various structures.

8 This information was determined using Image 272-37A provided by McLennan County and distances calculated using Google Earth (accessed on June 6, 2013). 9 Calculated using Google Earth (accessed on June 6, 2013).

West Fertilizer Company Final Report January 2016 18 U.S. CHEMICAL SAFETY AND HAZARD INVESTIGATION BOARD

WFC Facility Legend Figures in Report 1 Grain Silos 2 2 Location of Overturned FGAN Railcar (post-explosion) 15 3

Corn Silo

4

Office/Chemical Storage

5 Fertilizer Building 3-5, 7 6 Liquid Fertilizer Tanks 16 7 Anhydrous Ammonia Pressure Vessels 6, 17, 21 8

Scale House

9

Nearest Fire Hydrant

City of West Legend Figures in Report Approximate Distance from Seat of Blast to Fenceline (Feet)

West Fertilizer Company 2-8, 12 0

West High School 30 1157

West Intermediate School 23-29 552

Basketball Court 20 249

Playground 19 366

West Terrace Apartment Complex 36 454

West Rest Haven Nursing Home 33-35 629

Figure 1. 2013 Overview of WFC Facility (Source: Bing Maps) 2.1.1 Facility Operations Description The West, Texas, site consisted of two companies owned by the same family. Adair Grain, Inc., bought and sold grain while the WFC sold fertilizer, farming chemicals (pesticides and herbicides), and basic farm equipment (such as barbed wire, baling twine, and fencing). The WFC also rented farming equipment (fertilizer spreading equipment, tillage equipment) and spread fertilizer on farmland when needed, and its daily activities were largely based on season and weather.

West Fertilizer Company Final Report January 2016 19 U.S. CHEMICAL SAFETY AND HAZARD INVESTIGATION BOARD

Adair Grain bought grain (milo10 and corn) from farmers and stored it in four onsite silos (shown in Figure 1 and Figure 2). Adair Grain received grain from farmers’ trucks and deposited it into pits (Figure 3). An auger then transferred the grain from these pits, depositing it into the grain bin.

Figure 2. Grain Silos (Source: WFC Insurer)

10 Milo, also called grain sorghum, is a major feed grain for cattle.

West Fertilizer Company Final Report January 2016 20 U.S. CHEMICAL SAFETY AND HAZARD INVESTIGATION BOARD

Fertilizer Loading Pit and Conveyor Belt Railcar of Fertilizer

Figure 3. West View of Fertilizer Building (Source: Bing Maps) The WFC operated two buildings and a number of tanks (shown in Figures 1 and 3). One building served as a chemical warehouse, shop area, and office space. Most chemicals purchased by farmers were stored in that building. Such chemicals included Roundup®, Sevin®, and additives to make pesticides adhere to plants (such as Weedmaster® and Grazonnext®) and were stored in containers ranging in size from 2 to 300 gallons. The WFC also owned the fertilizer building, constructed in the 1960s, where dry fertilizer was stored (Figure 4). Fertilizers stored in that building included diammonium phosphate, ammonium sulfate, potash (potassium chloride), potassium magnesium sulfate (K-Mag), and FGAN. A seed room was located at the north end of this building (Figure 5).

West Fertilizer Company Final Report January 2016 21 U.S. CHEMICAL SAFETY AND HAZARD INVESTIGATION BOARD

Figure 4. Fertilizer Building Overview (Source: Atlas Engineering) Bagged Fertilizer Abandoned Bin Primary Ammonium Nitrate Bin Palletized Zinc Golf Cart Front End Loader Hay Seed Hay Seed Hay Seed Old Seed Storage Top of Elevator Twine

Figure 5. Southwest View from Northeast Corner of Fertilizer Building (Source: WFC Insurer) The WFC facility had two 12,000-gallon anhydrous ammonia11 (NH3) storage vessels, located to the south of the fertilizer building, for distribution and sale of the product to farmers (Figure 6). The

11 Anhydrous ammonia is a colorless and extremely water-soluble gas at room temperature, with a strong irritating odor. Ammonia gas is lighter than air, but under certain conditions, ammonia vapor can settle close to the ground during a leak, forming a white cloud. Ammonia can be compressed into a liquid under pressure, and within a concentration in air range of 15 to 28 percent, it is flammable. This is known as the lower explosive limit (LEL) and upper explosive limit (UEL), respectively. Ammonia exposure at lower concentrations can irritate the skin, eyes, and respiratory system, and at high concentrations, exposure can result in pulmonary edema and death.

West Fertilizer Company Final Report January 2016 22 U.S. CHEMICAL SAFETY AND HAZARD INVESTIGATION BOARD anhydrous ammonia was primarily trucked into the facility, but delivery by rail was also possible. Although anhydrous ammonia is used in the manufacture of AN, the WFC stored it onsite solely for sale to consumers as liquid fertilizer. Adjacent to the anhydrous ammonia tanks, liquid fertilizer was stored outside in several vertical tanks. This type of fertilizer included a urea ammonium nitrate (UAN) solution or liquid phosphate, and could be blended to meet specific farmer needs. One outside tank was normally full of water to mix with chemicals or liquid fertilizer. No products were manufactured onsite; the WFC was essentially a distribution center for suppliers such as Mosaic, BASF, Agri-Phos, El Dorado Chemical Company (EDC), and CF Industries. EDC and CF Industries are the only manufacturers of FGAN in the United States. The WFC mixed and sold bulk fertilizer components or unaltered products such as pure FGAN and ammonium sulfate. Farmers came to the WFC and bought fertilizer that was weighed in a hopper, blended in a mixer, and distributed by conveyor belt (the mixer and conveyor belt can be seen in Figure 7). The WFC also delivered and applied fertilizer or chemicals to a farmer’s fields if needed. Figure 6. Anhydrous Ammonia Storage (Source: WFC Insurer)

West Fertilizer Company Final Report January 2016 23 U.S. CHEMICAL SAFETY AND HAZARD INVESTIGATION BOARD

Figure 7. West View from East of Fertilizer Building (Source: WFC Insurer) 2.1.2 Facility Layout and Materials of Construction The fertilizer building (Figure 4) was a wood-framed structure with a concrete floor, at an elevation about 3 feet above grade. The building was constructed piecemeal over the years, starting with the original construction in 1961. The seed room was fabricated in the early 1980s, with a roof constructed of wooden rafters topped with plywood and covered with asphalt shingles. The only trench or drain in the building was in the cattle trough, which was used to collect fertilizer slurry when it became moist. A series of ladders were positioned adjacent to the elevator. FGAN was stored in two plywood bins along the west wall of the building and in one primary FGAN bin at the north end of building. The primary FGAN bin was normally no more than half full while the fertilizer bins on the west wall could be filled to the top of the containment. In the northeast corner of the building, an abandoned bin had been used to store fertilizer in the past but was unused at the time of the incident. The primary FGAN bin was constructed differently than the bins on the west wall. The bins on the west wall were composed of three walls rising to a height of about 10 feet and an open front. The primary bin was constructed by attaching plywood sheets to the inside of the exterior beams of the structure. The interior walls were also constructed of 6-inch beams with plywood attached. The main bin was estimated to be 8 feet wide, 20 feet long, and 30 feet high. A large hinged door covered the south end of the bin, with a 3-foot opening at the bottom. Holes were cut in the bin to provide air circulation, and a set of holes on the west wall allowed the bin to overflow into a smaller adjacent bin.

West Fertilizer Company Final Report January 2016 24 U.S. CHEMICAL SAFETY AND HAZARD INVESTIGATION BOARD

The door to the bin was normally closed when the bin was filled, and it could be opened to provide access after the inventory was reduced so that the fertilizer was not resting against the door. The bin was just wide enough (8 to 10 feet) to allow a front-end loader to drive in to access and gather the remaining FGAN. Like the west bins, the primary FGAN bin had plywood sheets (including some particle boards) and a wooden frame for support (shown post-explosion in Figure 8). The primary bin also had metal rods connected at opposite sides of the bin, providing internal stiffening support. About 2 years before the WFC explosion, the northeast corner of the north wall of the primary FGAN bin failed, and employees erected steel and concrete reinforcement around the bottom of the northeast corner to provide support and hold up the bin. As a result, the WFC never completely filled the primary bin to avoid another failure. A seed room,12 fabricated in 1980 and located at the north end of the fertilizer building served as the warehouse for seeds sold to consumers. Asphalt shingles covered the roof of the seed room of the fertilizer building. The seed room also stored more than 700 bags of zinc sulfate on the day of the fire and explosion. The zinc sulfate and seeds were stored in bags on pallets, with about 40 to 50 bags per pallet, stacked to a height of about 3 to 4 feet on each pallet. The seed room also contained two pallets of lawn and garden fertilizer (bagged at the WFC), twine, bailing wire, and fencing materials. At the west end of the seed room, 8 to 10 pallets of out-of-season seeds were segregated in an area cooled by an air

12 The seed room was used for storage of seed, bagged fertilizer, equipment, and vehicles, including a riding lawnmower, a golf cart, and a fork lift. It was constructed as an addition to the main fertilizer building in the early 1980s. . Figure 8. Plywood Bin Wall, Post-Explosion (Source: CSB)

West Fertilizer Company Final Report January 2016 25 U.S. CHEMICAL SAFETY AND HAZARD INVESTIGATION BOARD

conditioner. The east end of the seed room stored twine and netting. At the time of the incident, the room held a relatively low inventory of seeds (approximately 30 percent of the room’s capacity, or 3,000 bags of out-of-season seeds). 2.1.3 Unloading of Fertilizer Historically, suppliers delivered bulk fertilizer product by truck or rail, but immediately before the incident, most shipments arrived by truck. All bulk fertilizer was transferred into the bins (located as shown in Figure 4), using the same conveyor belt system described in the previous section. Delivered fertilizer was first deposited into a loading pit. An uncovered 20-inch-wide rubber conveyor belt then transported the product into the fertilizer building. The belt was cupped to hold the fertilizer, which was transferred from this conveyor belt to a bucket elevator (pictured post-explosion in Figure 9).

Figure 9. Elevator System Recovered from Blast Debris (Source: CSB) The elevator lifted the fertilizer to the cupola (the highest structure) and deposited it into polyvinyl chloride (PVC) pipes, which in turn conveyed the fertilizer to either the main FGAN bin or a horizontal conveyor belt for distribution to the bins along the west wall. A valve was used to gravity-feed material to either the large FGAN bin by way of PVC piping (approximately 20 feet long by 1 foot in diameter) or through an approximately 40-foot downpipe toward the horizontal conveyor belt in the main portion of the building. A piece of PVC piping could be added to the downpipe to direct product from the horizontal conveyor belt and to direct FGAN to the two FGAN overload bins on the west wall. The horizontal conveyor belt transported product to the bins in the southern portions of the building. A 6- to 8-foot “kicker” conveyor belt transferred the fertilizer from the horizontal conveyor belt to its final destination in any of the west wall bins. Electric motors powered the conveyor belts. Every fertilizer product used the same conveyor system process for filling the respective bins.

West Fertilizer Company Final Report January 2016 26 U.S. CHEMICAL SAFETY AND HAZARD INVESTIGATION BOARD

Workers used a front-end loader to move the fertilizer within the fertilizer building. For a blended fertilizer product, the operator would place a load of each product in a predetermined quantity into the weigh hopper. After all of the ingredients were weighed, the product was sent via a conveyor belt to a mixer, which had the appearance of a stationary concrete mixer. The mixed product was deposited on a conveyor belt and loaded into a truck or spreader. A yellow auger next to the conveyor mixed seed with fertilizer. Zinc sulfate could also be added to fertilizer. 2.1.4 Housekeeping Because unloading operations in the fertilizer building created a dusty environment, the first task of the day in the fertilizer building was cleaning the floor after work during the previous day and evening. To address these conditions during operating hours, the WFC used fans to control the dust during unloading, and on some occasions, workers added a vegetable oil coating to the ammonium phosphate to reduce the dust.13 An employee reported to CSB that some products were dustier than others and that floor sweeping compound was also applied to the fertilizer building floor on very wet days. When mixing fertilizer, operators usually added phosphate to the hopper and mixer first to eliminate any moisture. The employees reported that because FGAN tends to absorb moisture and dissolve, the WFC used air conditioning to cool and remove moisture from the primary FGAN bin. After the FGAN bin was emptied, it was swept to remove moisture. On damp or humid days, operators minimized handling FGAN unless necessary because it would “melt” and become lost product. When the fertilizer became damp and began to “sweat” onto the floor, it was swept into a trench (cattle trough) on the east side of the fertilizer building. The liquid captured as slurry in the trough was then pumped into a liquid fertilizer tank for disposal. Employees reported that the plywood walls between the bins “stayed pretty clean” and did not require any housekeeping. After a shipment of one type of fertilizer was unloaded, no cleaning process was used to clear the conveyor belt before the next load was transferred. During the unloading process, the fertilizer occasionally spilled because the conveyor belts got off track or ripped. In such cases, operators attempted to separate the products as best they could, but intermixing and cross-contamination nonetheless would occur. The fertilizer in the west bins was occasionally changed out, and if the product became damp and moist, it might have been emptied out with a “drier” product such as K-Mag placed into that bin. The K- Mag would dry out the bin, and afterward, the bin could revert to storage space for another product. Occasionally, the bin walls developed holes or cracks, and when that occurred, either new wood walls were put in place to replace the old ones or caulk was used to fill the holes.

13 Ammonium phosphate was the only product at the WFC with an oil coating.

West Fertilizer Company Final Report January 2016 27 U.S. CHEMICAL SAFETY AND HAZARD INVESTIGATION BOARD

  1. 0 Incident Description

On April 17, 2013, at approximately 7:29 pm, citizens reported signs of smoke and fire at the West Fertilizer Company (WFC) facility to the local 911 dispatch center. Within 20 minutes, a massive explosion occurred, killing 15 people and sending a blast wave through the town that damaged or destroyed many buildings and homes. The fire was witnessed from several vantage points by different individuals associated with the West Police Department, Dallas Fire-Rescue Department, and volunteer fire departments (VFDs) from West, Abbott, Bruceville-Eddy, Mertens, and Navarro Mills. These accounts assisted CSB in determining how the events of the day transpired. 3.1 West Police Department One of the first responders to the incident was a West Police Department officer who was on routine patrol that evening. The officer reported that he smelled smoke as he was driving through the city park14 but was not able to identify the exact location of the smoke until he encountered a concerned citizen who advised him that smoke was venting from the highest portion of the WFC building. The officer advised the dispatch center of the smoke and requested that the West Volunteer Fire Department (WVFD) be dispatched to the WFC facility. Once the officer arrived on scene, he witnessed flames that were visible through the wall, extending upward from the lower level to the upper level of the northeast corner of the two-story fertilizer storage building. Then he called dispatchers again and asked them to inform the WVFD that the smoke had escalated to a structure fire. The WVFD contacted the officer via radio and requested that he establish traffic control to prevent citizens from driving over the fire hoses once the fire engines arrived and laid down fire hoses. The officer agreed but notified the WVFD that he needed to evacuate the city park first. As the officer proceeded to the city park, the responding West firefighters drove past him, heading toward the facility. Once the officer reached the city park, he used his public address system to order an evacuation of the park. After the park was evacuated, he left the area to establish traffic control on the north end of the fertilizer facility. There was no traffic control at the south end toward West High School (WHS), so the officer asked a nearby resident to assist by using his truck to block that intersection. At this time, the officer contacted the police chief and another officer who had called to determine whether he needed assistance. The officer asked the police chief to establish traffic control by the West Intermediate School (WIS) and requested that the other officer relieve the resident who was helping near the high school. Numerous citizens began parking their cars at WHS to watch the fire. The WVFD truck left the WFC facility and headed toward the police officer. The manager of the WFC arrived on scene to assist the WVFD. Via radio traffic, the officer learned that the entire fertilizer storage building was engulfed in flames, and shortly thereafter he saw and felt the explosion. The officer was briefly disoriented and then unsuccessfully attempted via radio and cell phone to notify the dispatch center of the explosion. An

14 The city park consisted of the basketball court and the playground.

West Fertilizer Company Final Report January 2016 28 U.S. CHEMICAL SAFETY AND HAZARD INVESTIGATION BOARD

injured member of the public and an injured firefighter approached the officer, who assisted them. The possibility of further explosions or toxic releases was a concern because of the anhydrous ammonia pressure vessels on the south side of the WFC property. On the basis of this information, the officer decided to evacuate homes within a 1-mile radius. Because the officer’s patrol car would not start, he proceeded on foot along Jerry Mashek Drive and Main Street to alert people to evacuate (refer to Figure 1 for a map of the area). By the time the officer made his way to Reagan Street, he had become aware that other emergency responders had initiated the evacuation of the northern portion of the city. 3.2 West Volunteer Fire Department (WVFD) Emergency dispatchers paged the WVFD, and firefighters responded to the scene with two fire engines, two initial attack apparatus or brush trucks,15 and a water tender truck16 at various times. Dispatchers also paged mutual aid personnel from neighboring counties, including Abbott, which responded. Many of the firefighters also responded by using their personally owned vehicles (POVs). According to eyewitness accounts, the fire intensified very quickly and was described as a rolling fire that moved from the northeast end of the fertilizer building (in the seed storage area north of the office) toward the southern end of the building. Five firefighters arrived on scene in two fire engines at different times. The first fire engine arrived on scene and staged east of the burning structure while one of the brush trucks staged to the north of the first fire engine. Four other firefighters directed water (using two 1.5-inch hoses) from the first fire engine’s internal tank onto the fire through the northeast doorway of the bagged fertilizer room, where fire was present. Once the second fire engine arrived on scene, the two firefighters from that fire engine began laying 1,000 feet of 4-inch hose line from the fire hydrant near the high school (1,600 feet away) toward the fertilizer facility. After laying all of the hose lines from the second fire engine, they discovered that the hose was approximately 700 feet short of the length needed to effectively fight the fire. After assessing the situation, one firefighter arranged to take the first fire engine, which had a better pump with greater pressure capabilities and additional hose that would allow him to continue to reverse-lay the lines.17 However, rather than resuming where the first fire engine ran out of hose, the firefighter went back to the fire hydrant near the high school to connect the first engine to the hydrant without laying the additional length of hose needed to supplement the hose that had already been laid from the second

15 Initial attack fire apparatus as defined in NFPA 1901 is fire apparatus with a permanently mounted fire pump of at least 250 gallons per minute (gpm) capacity, water tank, and hose body whose primary purpose is to initiate a fire suppression attack on structural, vehicular, or vegetation fires and to support associated fire department operations. Normally, most initial attack fire apparatus are constructed on commercial-style chassis. NFPA 190:1 Standard for Automotive Fire Apparatus, 2016 Edition. Quincy, MA: NFPA, 2016. 16 A water tender is the National Incident Management Systems (NIMS) approved term for a wheeled vehicle carrying water for fire suppression. 17 In firefighting, reverse lay refers to the nozzle end of the hose being laid from the fire to a water source. This method is used when the pumper must first go to the fire location to size it up before laying supply line, and it is the most expedient way to lay hose if the apparatus must stay close to the water source.

West Fertilizer Company Final Report January 2016 29 U.S. CHEMICAL SAFETY AND HAZARD INVESTIGATION BOARD

engine. He saw flames (40 to 50 feet high) coming out of the cupola atop the fertilizer storage building and out of the door on the northeast corner of the building. Before the firefighter could make his way back to the end of the hose run, the explosion occurred. Before the explosion, the WVFD assistant chief arrived at the WFC facility, spoke with the police officer on scene, and advised him to begin evacuating nearby homes. He also made a radio request to the dispatch center, asking for a ladder truck to set up at the West Terrace Apartments in case a fire started there, but a ladder truck was not available. The WVFD chief and assistant fire chief were assessing the situation just before the explosion and were considering a total evacuation, even though neither believed that the FGAN would explode.18 On the basis of interviews that CSB conducted after the incident, the WVFD came to understand that it did not have enough water to effectively fight the fire.19 Accordingly, the WVFD was considering the appropriate course of action—possibly standing down, letting the structure burn, and focusing on evacuation. 3.3 Abbott, Bruceville-Eddy, Mertens, and Navarro Mills Volunteer Fire Departments On the evening of the incident, a group of volunteer firefighters from neighboring city fire departments (including Bruceville-Eddy, Mertens, and Navarro Mills), who were taking an Emergency Medical Technician (EMT)–Basic class at the West Emergency Medical Services (EMS) building, responded to the fire. The West EMS facility is located a few blocks west of the WFC facility.20 When these volunteer firefighters heard the sirens activated in the city, they immediately made their way to the site. In addition, an ambulance responded with two EMTs and a volunteer firefighter. According to interviews that CSB conducted with emergency responders, radio and cell phone capabilities at the scene were limited after the explosion. Following the explosion, officials established two different staging areas. The first staging area, at the high school football field about 0.25 miles from the blast site, was used as a triage area for injured residents. Injured personnel and residents were relocated from the football field to the second staging area, at the community center about 1 mile away.21 After the explosion at approximately 8:15 pm, additional volunteer firefighters from the neighboring cities of Abbott, Bruceville-Eddy, Mertens, and Navarro Mills responded to the WFC facility. Figure 10 shows the WFC explosion as it unfolded.

18 Section 7 of this report provides further details on how the evacuation occurred. 19 Employees and emergency responders should not fight AN fires past the incipient stage. Further details on responding to AN fires is available in Section 7.5 and Section 7.6 of this report. 20 State Fire Marshal’s Office. “Firefighter Fatality Investigation,” Investigation FFF FY 13-06 (West, TX). 21 Clements, Bruce. Texas Department of State Health Services, “The Texas Public Health Response to the West Fertilizer Plant Explosion,” October 8, 2013.

West Fertilizer Company Final Report January 2016 30 U.S. CHEMICAL SAFETY AND HAZARD INVESTIGATION BOARD

Figure 10. Video Stills of WFC Fire and Explosion (Source: Member of the Public) 3.4 Consequences 3.4.1 Fatalities and Injuries The violent explosion at the WFC facility fatally injured 12 emergency responders and 3 members of the public. All of the fatalities except one resulted from fractures, blunt force trauma, or blast force injuries sustained at the time of the explosion. Two fatally injured members of the public lived at a nearby apartment complex while the third resided at the nursing home and died from injuries brought on by the trauma of the explosion shortly after the incident. According to the Waco-McLennan County Public Health District’s report, 22 the incident resulted in more than 260 injured victims, including emergency responders and members of the public.23 Hill County (Hill Regional Hospital and Lake Whitney Medical Center) and McLennan County (Hillcrest Baptist Medical Center and Providence Health Center) hospitals received 81 percent of patient visits, with 104 injury visits at Hillcrest Baptist Medical Center, 82 visits at Providence Health Center, 41 injury visits to Hill Regional Hospital, and 1 injury visit at Lake Whitney Medical Center.24 The injuries ranged from relatively minor wounds (such as contusions, abrasions, and lacerations) to more serious injuries (such as fractures, closed head injuries, traumatic brain injuries, and skin burns). The majority of patients were treated and released after their initial visit to a hospital, medical center, or mobile medical unit. Figure 11 categorizes all injury types sustained by the 252 patients injured directly by the explosion; many patients received multiple types of injuries. The Waco- McLennan County Public Health report also identified the location where 76 percent of the reported 252

22 Waco-McLennan County Public Health District. “A Public Health Report on Injuries Related to the West (Texas) Fertilizer Plant Explosion,” June 24, 2014. 23 The number of injured victims includes patients who were treated after the explosion and sustained injuries during clean-up or by debris in the neighborhood. 24 Waco-McLennan County Public Health District. “A Public Health Report on Injuries Related to the West (Texas) Fertilizer Plant Explosion,” June 24, 2014: 7.

West Fertilizer Company Final Report January 2016 31 U.S. CHEMICAL SAFETY AND HAZARD INVESTIGATION BOARD

injuries occurred, outside or inside of a structure. More than half of the injured patients reported being inside a structure (55 percent), and the rest said they were outside (13 percent) or inside of a vehicle (8 percent). The locations cited by the injured also reflected the most common types of injuries. Patients who were inside a structure were twice as likely to suffer abrasions, contusions, and lacerations. People who were outside or inside of a vehicle were eight times more likely to have hearing loss or tinnitus, tympanic membrane rupture, or inhalation injuries. The majority of the injured were within 1,500 feet of the blast, although some were more than 2,000 feet from the explosion; people who were hospitalized were closer to the center of the blast than those who were not admitted. Notably, eye injuries—and traumatic brain injuries and concussions—were equally distributed among the injured, regardless of location.25 Detailed information regarding the cause of nonfatal injuries was not collected and analyzed. Possible causes of injuries include being struck by primary fragment projectiles, by secondary fragments from remote structures and vehicles, or directly by the blast wave.

Figure 11. Number of Nonfatal Injuries, by Injury Type (Source: Waco-McLennan County Public Health District)26 During the investigation, CSB noted two potential scenarios that could have led to more severe consequences. First, if the fire had started during the middle of a normal school day instead of the

25 Waco-McLennan County Public Health District. “A Public Health Report on Injuries Related to the West (Texas) Fertilizer Plant Explosion,” June 24, 2014. 26 Waco-McLennan County Public Health District. “Public Health Report: Injuries Related to the West (Texas) Fertilizer Plant Explosion,” April 2013 (issued on June 24, 2014). 141 134 53 34 31 30 29 21 12 12 6 0 20 40 60 80 100 120 140 160 Abrasions/contusions Lacerations/penetrating trauma Traumatic brain injuries/concussions Tinnitus/hearing problems Eye injuries Inhalation injuries Sprains/strains Fractures/dislocations Blast injuries Tympanic membrane ruptures Burns Number of Injuries

West Fertilizer Company Final Report January 2016 32 U.S. CHEMICAL SAFETY AND HAZARD INVESTIGATION BOARD

evening and if all other conditions remained unchanged (specifically, if onsite WFC employees were unable to extinguish the fire), students would have been present at the intermediate and high schools. Had the schools evacuated, students likely would have assembled in areas such as the gymnasium and multipurpose rooms within the schools (and in other pre-designated areas outside of the schools) before the evacuation to conduct a head count. Given the short time that elapsed before the explosion, many students and staff members might have been injured in the 20 minutes from the first discovery of a fire until the explosion. Second, a railcar loaded with more than 100 tons of FGAN toppled during the explosion but did not detonate. If the contents of the railcar had detonated, the damage, injuries, and fatalities would have been significantly worse. These scenarios are important to consider because throughout the United States, there are many facilities that, like WFC, are located near public structures such as schools.27 3.4.2 Property Damage The West incident caused considerable property damage, including the complete destruction of the WFC facility (Figure 12). An initial estimate by the Texas Department of Insurance set total property damage resulting from the explosion and fire at $100 million. CSB hired a consulting firm28 to perform an assessment of the structural and property damage caused by the fire and explosion. The assessment involved a thorough examination of damage to the WFC facility and to the community structures and facilities.29 As of the publication of this report, neither the owners of the WFC nor the city of West has decided whether the WFC facility would be rebuilt. Currently, the local farmers are using fertilizer from another fertilizer facility in Leroy, Texas, seven miles east of the city of West.

27 Section 5.4 provides further details on the location of schools in relation to FGAN facilities throughout Texas. 28 ABSG Consulting Inc. See: http://www.absconsulting.com/ (accessed on June 26, 2015). 29 Sites examined included the West Intermediate School (WIS), West High School (WHS), West Middle School (WMS), West Rest Haven nursing home, and the park.

West Fertilizer Company Final Report January 2016 33 U.S. CHEMICAL SAFETY AND HAZARD INVESTIGATION BOARD

Figure 12. Overview of Damage to WFC Facility (Source: Texas Civil Air Patrol) The explosion, overpressure, and debris completely destroyed a WVFD brush truck, water tender, and fire engine (Figure 13). The water tender was located southeast of the crater and likely moved about 6 inches south as a result of the blast overpressure. The explosion propelled the door from the water tender to the east. A large farm truck south of the fertilizer storage building and toward the scale house moved about 6 inches south of its original location because of the blast wave (Figure 14). All of the POVs belonging to responding volunteer firefighters who parked onsite were damaged or destroyed in the explosion. In addition, the explosion overturned and destroyed the railroad car loaded with FGAN, approximately 190 feet to the north of the crater (Figure 15).

Overturned FGAN Railcar Vertical Liquid Fertilizer Tanks Fire Department Water Tender EMS Vehicle Damaged Railroad Anhydrous Ammonia Pressure Vessels Overturned FGAN Railcar Vertical Liquid Fertilizer Tanks Fire Department Water Tender EMS Vehicle Anhydrous Ammonia Pressure Vessels

West Fertilizer Company Final Report January 2016 34 U.S. CHEMICAL SAFETY AND HAZARD INVESTIGATION BOARD

Figure 13. Damaged WVFD Water Tender (Source: ABS Consulting)

Figure 14. Farm Truck South of Crater, Near the Scale House (Source: ABS Consulting)

West Fertilizer Company Final Report January 2016 35 U.S. CHEMICAL SAFETY AND HAZARD INVESTIGATION BOARD

Figure 15. Railcar Loaded with FGAN, Destroyed and Overturned by Explosion (Source: CSB) The explosion completely demolished the scale house; the roof and all four walls failed. The explosion flattened the chemical storage and office building east of the fertilizer storage building—all that remained was a stack of metal debris where the building once stood. The explosion also destroyed the corn silo north of the fertilizer storage building. In addition, the blast heavily damaged the above-ground vertical liquid fertilizer storage tanks. As shown in Figure 16, the liquid level during the explosion in the tank to the left is clearly visible by the crease at the top of the tank where the deformation begins. The tank on the right in Figure 16 clearly shows a large debris impact that folded and crushed the tank.

Figure 16. Liquid Fertilizer Tank Damage (Source: CSB)

West Fertilizer Company Final Report January 2016 36 U.S. CHEMICAL SAFETY AND HAZARD INVESTIGATION BOARD

The two 12,000-gallon anhydrous ammonia pressure vessels were approximately 30 percent full of ammonia at the time of the explosion. As shown in Figure 17, the anhydrous ammonia pressure vessels were south of the crater. The pressure relief valves (PRVs) on the northern anhydrous ammonia pressure vessel still had their weather caps on and consequently did not relieve the pressure. The weather caps were missing on the PRVs in the middle of the southern anhydrous ammonia pressure vessel.30 Two additional liquid fertilizer storage tanks sat parallel to the railroad track southwest of the anhydrous ammonia pressure vessels. The blast of the explosion also damaged the tracks on the railroad between the WFC property and the park. The blast was sufficiently powerful to shift the tracks more than 2 feet to one side, creating a prominent curve in the tracks (Figure 18).

Figure 17. Anhydrous Ammonia Pressure Vessels (Source: CSB)

30 The condition of the anhydrous ammonia pressure vessels is discussed in further detail in Section 3.4.2.1 of this report.

West Fertilizer Company Final Report January 2016 37 U.S. CHEMICAL SAFETY AND HAZARD INVESTIGATION BOARD

Figure 18. Damaged Railroad Tracks Adjacent to WFC Facility (Source: CSB) The explosion damaged a playground and basketball court in a park located a few hundred feet west of the WFC facility (Figure 19). The blast destroyed equipment on the playground, including damaging the basketball goal posts on the basketball court (Figure 20). In addition, the trees in the vicinity of the park showed evidence of scorching,31 likely from the fireball when the explosion occurred. The trees were directly downwind of the anhydrous ammonia pressure vessels and were not within the smoke plume from the fire. Pre-explosion video of the fire shows the smoke traveling with the wind but crossing the playground equipment to the north of the basketball courts.

Figure 19. Damaged Playground Equipment (Source: ABS Consulting)

31 The ABS damage assessment did not include making a determination about whether the trees were scorched by the fire or by another source.

West Fertilizer Company Final Report January 2016 38 U.S. CHEMICAL SAFETY AND HAZARD INVESTIGATION BOARD

Figure 20. Damaged Basketball Goal Post at Park (Source: ABS Consulting) 3.4.2.1 WFC Anhydrous Ammonia Vessels The two 12,000-gallon anhydrous ammonia vessels were located at the south end of the storage building, about 150 feet from the site where the initial fire and smoke were observed. Each vessel was more than 46 feet long, with two affixed PRVs set to vent the tanks to the atmosphere if the pressure inside the tanks exceeded predetermined set points, estimated by one employee as between 250 and 300 pounds per square inch (psi). Both sets of PRVs were fitted with orange plastic caps intended to protect the devices from rain and dirt. The vessels shared a common pipeline that allowed switching between the tanks on occasion, but under normal operation, the connecting pipe was kept in a closed position. CSB observed the intact PRVs on top of the vessels (Figure 21) on May 28, 2013, although the polyvinyl chloride (PVC) protective caps were no longer in place on the PRVs of the southernmost tank. The absence of detectable residue of this protective material on the PRV suggested that it was exposed to fire to the degree that it melted. The caps were not found during any post-incident salvage or recovery activities. During salvage operations, a crane with lift bucket reportedly struck the PRV for the northernmost tank, knocking it to the ground where it was found.

West Fertilizer Company Final Report January 2016 39 U.S. CHEMICAL SAFETY AND HAZARD INVESTIGATION BOARD

Figure 21. Anhydrous Ammonia Tank PRV, Post-Incident (Source: CSB) From interviews with employees who were knowledgeable about the frequency of deliveries and volumes in the tanks, CSB learned that the site received as many as four deliveries of anhydrous ammonia per day under normal operating conditions with good weather and that each vessel was at 30 percent capacity, or about 7,200 gallons, at the time of the fire and explosion. After the incident, technicians removed all remaining contents in both vessels. When hazardous materials technicians in fully encapsulated personal protection equipment initially entered the area of the anhydrous ammonia vessels after the site was secured, they observed a leaking valve at the east end of the tanks. In light of a buildup of ice around the valve, it is thought that the material leaking was liquid anhydrous ammonia. Notably, anhydrous ammonia stored under pressure contains latent heat. As the liquid is released, it cools rapidly and interacts with moisture in the atmosphere and can freeze on the pipe and adjacent vessel. However, the vessels did not catastrophically fail on the night of the incident. The CSB considers this to be a near-miss of potentially significant consequence. 3.4.3 West Independent School District The WFC built its facility in 1962, before much of the surrounding community developed. In 1923, the West Independent School District (WISD) (Figure 22) built the West Middle School (WMS), which at the time served as the high school for the city of West. The WMS campus added a building in 1957 that served as supplementary classrooms and library space. The WISD also built West Elementary School (WES) in the early 1960s. WIS was built around 1985, and WHS was constructed in 2000, after the WFC facility was built. Four schools were in close proximity to the facility, including WIS (552 feet southwest

West Fertilizer Company Final Report January 2016 40 U.S. CHEMICAL SAFETY AND HAZARD INVESTIGATION BOARD

of the facility), WHS (1,263 feet southeast of the facility), WMS (2,000 feet southwest of the facility), and WES (4,867 feet southwest of the facility).32

Figure 22. Proximity of WFC Facility to Schools and Other Public Structures (Source: Google Earth)

32 The growth of the community around the WFC facility is discussed in further detail in Section 9 of this report. West Fertilizer Company West High School Playground West Rest Haven West Intermediate School West Middle School West Terrace Apartments West Elementary School

West Fertilizer Company Final Report January 2016 41 U.S. CHEMICAL SAFETY AND HAZARD INVESTIGATION BOARD

The overpressure from the explosion’s blast wave caused most of the damage, although some fires started post-explosion, including those at WIS and many nearby homes. At the time of the incident, school was not in session, which limited the number of fatalities and injuries to members of the public (including students, teachers, and other staff members). However, if the explosion had occurred during normal school hours, the number of injuries and fatalities from the blast wave could have been much higher. Table 2 indicates the projected number of students and staff members who would have been affected and could potentially have been injured or killed by the blast if school had been in session. If all enrolled students had been in school that day, approximately 1,486 students would have been present and vulnerable. Of this total, 665 students would have been at WIS and WHS, which suffered the most severe damage. If the explosion had occurred during school hours and all staff members had been present that day, approximately 191 staff members would have been vulnerable. Of this total, 86 staff members would have been at WIS and WHS. Because of the breadth of damage at the schools, the WISD decided to demolish WIS, WHS, and all WMS facilities except for the gymnasium and the 1923 building. The WISD also demolished select portions of the 1967 annex and the entire cafeteria at WMS. Appendix A includes a discussion of the details of WISD plans to restore and rebuild the school system. For a more complete understanding of the magnitude of the injuries and fatalities that the WFC incident could have caused, this report considers in greater detail the extent of damage at the schools. Table 2. Estimated Number of Students and Staff During School Hours School Grades Estimated Number of Students Enrolled Estimated Number of Staff Members West Intermediate School 4-5 246 22 West Middle School 6 320 40 West High School 7-12 419 64 West Elementary School K-3 501 45 Total Occupants

1,486 171

West Fertilizer Company Final Report January 2016 42 U.S. CHEMICAL SAFETY AND HAZARD INVESTIGATION BOARD

  1. 4.3.1 Damage Assessment of the West Intermediate School

The original WIS was a pre-engineered metal building consisting of lightweight steel frames, cold-formed girts,33 and purlins34 supporting lightweight metal decks. The gymnasium and cafeteria were also pre- engineered metal buildings. The remainder of the school was constructed of precast concrete tilt-up load- bearing walls that supported open webbed steel joists and a metal roof deck with a built-up roof. Figure 23 shows the building room layout in the school evacuation plan and highlights in yellow some classrooms with extensive damage. A considerable amount of debris accumulated in the hallway outside of rooms 11 and 12 (Figure 24). An interior doorframe blocked the hallway; the acoustic ceiling had collapsed; and numerous obstacles would have made exiting the building difficult for students and staff. In addition, the original metal school building just south of this location was involved in a fire after the explosion at the WFC facility, so students and staff members also would have been exposed to smoke and heat. The acoustic ceiling, light fixtures, and other debris were thrown onto all of the desks in the interior of classroom 12 (Figure 25). Moreover, the window on the north facade failed violently, and a large shard of glass (approximately 3 inches long) was embedded in the assignment poster on the south wall of the classroom (Figure 26). Room 8 Room 7 Room 6 Room 5 Room 9 5th Grade Lab Room 10 Girls RR Book Room Boys RR Lounge Workroom Storage Ja Nurse Asst Princ Room 12 Room 11 PRR Room 13 4th Grade Lab Library Room 4 Room 3 Room 2 Tech Room 1 Tech Room 18 Room 17 Room 16 Room 15 Comp Labs Room 19 Cafeteria Gym Gym RRs Room 21 Room 22 Room 23 Room 20 RRs Princ Office Area West Intermediate School Evacuation Route N REAGAN ST.

Figure 23. WIS Room Layout in Evacuation Plan (Source: CSB)

33 A horizontal structural member that spans columns or posts in framed construction and is used to support cladding. Dictionary of Construction, Surveying and Civil Engineering (2012). 34 A horizontal roof member that runs parallel to the ridge and spans the roof trusses and is used to support the roof covering. Dictionary of Construction, Surveying and Civil Engineering (2012).

West Fertilizer Company Final Report January 2016 43 U.S. CHEMICAL SAFETY AND HAZARD INVESTIGATION BOARD

Figure 24. WIS North Hallway, Looking Toward Northeast Exit Door (Source: ABS Consulting)

Figure 25. Glazing Hazard in WIS Room 12 (Source: ABS Consulting)

West Fertilizer Company Final Report January 2016 44 U.S. CHEMICAL SAFETY AND HAZARD INVESTIGATION BOARD

Figure 26. Embedded Glass in Assignment Poster in WIS Room 12 (Source: ABS Consulting) The pre-engineered portion of the school in the northeast corner was heavily damaged by blast overpressure and was also fully engulfed in flames. At the time of the physical survey, blast damage to this portion of the building could not be evaluated because of the magnitude of the fire and associated heat; however, Figure 27 does provide a view looking east down the hallway of this part of the school after the fire.

Figure 27. Interior of Burned Northeast Section of WIS (Source: ABS Consulting)

West Fertilizer Company Final Report January 2016 45 U.S. CHEMICAL SAFETY AND HAZARD INVESTIGATION BOARD

The WFC explosion heavily damaged the WIS gymnasium (Figure 28). There was evidence that some of the built-up roof over the gymnasium burned; however, the level of heat damage to the roof was minor compared to the damage from blast overpressure. The north half of the gymnasium roof failed. Within the gymnasium, the blast heavily damaged the pre-engineered frames, which were unstable as a result. The roof purlins were moderately deformed, with the exception of the failure that occurred on the north half of the frame spans. Furthermore, the windows from the south facade of the gymnasium failed, and the overpressure propelled them over the south bleachers and onto the gym floor. The explosion also heavily damaged the roof in the cafeteria to the south of the gymnasium.

Figure 28. WIS Gymnasium (Source: ABS Consulting) The interior of classroom 20 also sustained significant damage (Figure 29). The acoustic ceiling, light fixtures, and insulation were blown down onto the floor by a combination of the roof motion and the air blast entering through the heating, ventilation, and air conditioning (HVAC) duct after the explosion displaced the rooftop air conditioner. After the incident, the entire contents of the ceiling plenum were found on top of the desks. If the explosion had occurred during school hours, any students or staff members in the room would have been covered in this debris and would have had to climb over (or through) it to reach the exit. In addition, there was evidence that overpressure entered the room through the HVAC opening and was of sufficient magnitude to cause the door latch to fail. The damage to WIS decreased as the distance from the explosion source increased from the northeast to the southwest. WIS also housed the technical department where all of the school servers were kept. The servers and the data stored on them were lost in the explosion and fire.

West Fertilizer Company Final Report January 2016 46 U.S. CHEMICAL SAFETY AND HAZARD INVESTIGATION BOARD

Figure 29. WIS Classroom 20 (Source: ABS Consulting) 3.4.3.2 Damage Assessment of West High School WHS was constructed of concrete masonry unit walls supporting open webbed steel joists and a metal deck with built-up roofing and gravel ballast.35 The building room layout (on the basis of the school evacuation plan) shows that the school was organized into two wings (Figure 31). The north wing contained the activities area, including the two gymnasiums, two weight rooms, boy’s athletics locker room, girl’s athletics locker room, and band hall. The south wing included the classrooms as well as a large lecture hall. Between the two wings were the entry hall, administrative offices, common areas, kitchen, and (to the rear) auditorium. A pre-engineered maintenance building sat directly behind the school to the east.

35 Small gravel placed on a built-up roof to protect the roof from ultraviolet light, heat, and weather and to protect the roof membrane from degradation.

West Fertilizer Company Final Report January 2016 47 U.S. CHEMICAL SAFETY AND HAZARD INVESTIGATION BOARD

N

Figure 30. WHS Evacuation Map (Source: WISD) The WHS auditorium was a steel frame structure with masonry infill walls. After the WFC explosion, some of the masonry veneer on the exterior was loose near the northeast corner. Inside the auditorium, large areas of the hanging ceiling were unstable, and the supporting structure was compromised, especially one area of the ceiling (between the seating and the stage), which was near collapse because of the failed hanger connections. Viewed from underneath, evidence of damage to the ceiling was observable at light fixtures, and evidence of cracking and separation was visible near the walls. However, the severity of the damage and compromise to the ceiling hangers became fully evident when they were inspected from the catwalks above the auditorium. 3.4.3.3 Damage Assessment of West Middle School WMS was the school third farthest from the WFC site, and although it sustained less damage than WIS and WHS, it was nonetheless severely damaged in the explosion. WMS resided at the site of the original WHS, constructed in 1923. The athletic field east of WMS was the site employed for triage and evacuation of the wounded after the explosion (Figure 31).

West Fertilizer Company Final Report January 2016 48 U.S. CHEMICAL SAFETY AND HAZARD INVESTIGATION BOARD

Figure 31. WMS Layout (Source: Bing Maps) The practice gymnasium was a lightweight pre-engineered metal building with a brick facade. The pre- engineered frames buckled after the explosion, resulting in a small permanent deformation of the roof purlins. In addition, the overpressure damaged the roof purlins and frames. An external assessment of the cafeteria and auditorium indicated damage to the ceiling components. Many of the windows on the west facade were unbroken. The original high school classroom building at WMS was constructed in

  1. The windows facing north toward the WFC facility were broken, but only some of the remaining

windows had failed. The building originally was not air conditioned and had a high tin ceiling, but at a later date, a new drop ceiling was installed to accommodate central air conditioning. After the explosion, the new drop ceiling failed, but the original tin ceiling was still in place, and some of the windows were broken. Window hazards thus were low to moderate, and the damage to the exterior appeared to be superficial. The classroom annex building roof structures were open web steel joists supporting a built-up roof on metal deck. The roof structure showed no observable damage; however, the suspended ceiling failed because of the motion of the roof (Figure 32).

West Fertilizer Company Final Report January 2016 49 U.S. CHEMICAL SAFETY AND HAZARD INVESTIGATION BOARD

  1. 4.3.4 Damage Assessment of West Elementary School

WES was the campus farthest from the WFC site and sustained very minimal damage. WES received minor renovations, such as removing and replacing damaged ceilings, replacing damaged windows, and performing general interior clean-up.36 3.4.4 West Rest Haven Nursing Home The explosion also destroyed the West Rest Haven nursing home, located west and within 600 feet of the WFC facility, at the corner of North Reagan Street and West Haven Street (Figure 33). Since 1967, the nursing home had provided residents with routine care and also treated patients with Alzheimer’s disease, diabetes, and hypertension, among many medical conditions. Approximately 20 of the 155 staff members and 130 patients37 were in the nursing home during the explosion. All were evacuated with the assistance of the nursing home staff and neighborhood volunteers, yet 72 patients sustained injuries. The level of severity of the injuries varied from cuts caused by broken glass and building materials to broken bones. An 87-year-old man succumbed to a stress-related heart attack; however, his death was not a direct result of the explosion. Before the explosion, the nursing home’s medical director came to the Reagan Street entrance and directed the charge nurse to begin evacuating residents to the other side of the facility in response to the ongoing fire at the WFC facility. As the charge nurse began the evacuation process, the explosion occurred. During the post-blast evacuation, staff members and volunteers removed many bedridden

36 See: http://www.restorewestisd.com/plans.html (accessed on December 22, 2015). 37 The nursing home had a capacity of 145 individual licenses.

Figure 32. Classroom Annex Interior Hallway and Ceiling Damage at WMS (Source: ABS Consulting)

West Fertilizer Company Final Report January 2016 50 U.S. CHEMICAL SAFETY AND HAZARD INVESTIGATION BOARD

residents from the building through the windows instead of the hallways out of concern that the structure would collapse. The residents were moved from the back of the nursing home to the front during the fire, evacuated after the explosion to a helicopter pad and football field, and eventually moved to the community center. The 72 injured residents were transported to Providence Health Center and Hillcrest Baptist Medical Center to receive treatment. After the residents were treated and released, they were relocated to various nursing homes in the neighboring cities of Waco, Midway, Hewitt, Clifton, and Hillsboro. Uninjured residents were also relocated to these nursing homes. Within 2 months of the incident, 14 of the West Rest Haven nursing home residents died, a figure cited as unusually high by the facility’s administrator,38 and since the incident, approximately 50 patients have died. According to information the nursing home provided to CSB in May 2015, almost all of the 80 living patients who formerly resided at West Rest Haven tentatively planned to return to the nursing home once the new construction was complete.

Figure 33. Damage to Reagan Street Entry of West Rest Haven (Source: ABS Consulting)

38 See: http://www.dallasnews.com/news/west-explosion/human-toll/20130617-some-say-west-blast-rushed-nursing- home-patients-deaths.ece (accessed on December 22, 2015).

West Fertilizer Company Final Report January 2016 51 U.S. CHEMICAL SAFETY AND HAZARD INVESTIGATION BOARD

  1. 4.4.1 West Rest Haven Nursing Home Disaster and Evacuation Plan

West Rest Haven followed a disaster and evacuation plan that include policies and procedures39 to meet all potential types of emergency and nonemergency situations, including fires, disasters, explosions, toxic fumes, train derailments, broken gas mains, auto and truck collisions, and fire drills. The plan included detailed evacuation procedures in the event of a fire as well as shelter-in-place procedures for events such as severe weather. Depending on the location of the fire, patients could be evacuated to another portion of the building rather than being completely removed from the premises. The disaster and evacuation plan also contained transportation and sheltering agreements if needed during an emergency evacuation of the facility. The plan also provided guidance to the facility’s operators on responses to a derailed train or ruptured tank cars containing potentially hazardous liquids and on steps to shelter in place if the facility were exposed to hazardous gas or vapors.40 West Rest Haven scheduled monthly fire drills to meet the requirement to conduct fire drills during each of the three work shifts. In addition, the nursing home held a mock disaster drill approximately 3 months before the explosion, employing a scenario that assumed a toxic gas release from the WFC facility. 3.4.4.2 Damage Assessment of West Rest Haven Nursing Home The West Rest Haven nursing home was irreparably damaged (Figure 33), leading the city to completely demolish the structure 3 months after the incident.41 The nursing home was constructed of load-bearing wood stud walls (with brick veneer) and wood trusses that spanned the wings from exterior wall to exterior wall (east to west). The nursing home’s emergency exit plan (Figure 34) shows the floor plan and room layout. The explosion most heavily damaged the eastern-most corridor of the building. As a result of the explosion, the roof trusses collapsed, and the east wall failed. The eastern rooms were heavily damaged and subjected to flying wall debris and window fragments in addition to failing drywall, insulation, and light fixtures from the ceiling. Investigators observed high glazing hazards, including glass shards that penetrated the wall opposite the windows. The ceilings, insulation, and interior contents of rooms were lying on beds and blocking doorways, posing hazards to any occupants of these rooms. In addition, the air blast would have infiltrated the rooms through the failed windows. Pieces of broken glass littered the inside of the nursing home, with the exception of hallway corridors that were shielded from windows by interior partitions. The great rooms, lobby, and patient rooms were also subjected to significant hazards from broken shards of glass.

39 The disaster and evacuation plan also includes policy and procedures for severe weather, bomb threats, water shortages, electrical power outages, loss of comfort heating, heat and humidity, and floods. 40 West Rest Haven Inc. “Disaster and Evacuation Plan.” 41 See: http://video.dallasnews.com/Damaged-West-nursing-home-razed-3-months-after-blast- 24951515?freewheel=90850&sitesection=dallasnews_nws_non_non&VID=24951515#.Uv58DMKYbIU (accessed on January 4, 2016).

West Fertilizer Company Final Report January 2016 52 U.S. CHEMICAL SAFETY AND HAZARD INVESTIGATION BOARD

Figure 34. Emergency Exit Floor Plan for the West Rest Haven (Source: CSB) The blast also inflicted significant damage to the western portion of the nursing home, and the great rooms, such as the lobby, were hit particularly hard because of the large spans of the overhead trusses that failed and collapsed onto the furniture. In addition, hallways in this area presented many hazards, including hanging light fixtures, failed ceiling joists, and collapsed drywall and insulation on the floors. Moreover, the debris field of the nursing home contained secondary fragments from massive pieces of the WFC facility’s concrete foundation and also significant masses of earth. Observations indicated that a large piece of the WFC foundation, measuring 16 inches wide by 16 inches tall and 36 inches long (Figure 35, right) impacted room 79, traveling through the roof and the exterior wall (Figure 35, left). This debris fragment was calculated at a weight of approximately 800 pounds and had sufficient momentum after the impact to exit the nursing home, strike the ground, and then travel an additional 60 feet before coming to rest just to the west of North Davis Street.

West Fertilizer Company Final Report January 2016 53 U.S. CHEMICAL SAFETY AND HAZARD INVESTIGATION BOARD

Figure 35. Crater and Debris (left) from Fragment (right) of WFC Facility Foundation that Impacted West Rest Haven (Source: ABS Consulting) On April 4, 2014, the city of West broke ground at 503 Meadow Drive, a block away from the original site, on the new 120-bed West Rest Haven nursing home (with 75,000 square feet), which opened in summer 2015.42 The estimated construction cost is $11 million. West Rest Haven did not receive any grants or federal money to rebuild the facility. 3.4.5 West Terrace Apartment Complex The West Terrace Apartment Complex, a 22-unit apartment complex built in 1979 and owned by J&B Realty Ltd., was 450 feet due west of the epicenter of the explosion. Two members of the public were fatally injured at the apartment complex. One of the victims was most likely standing on the east side of the complex and watching the fire shortly before the explosion occurred. The second victim was most likely inside her lower-level one-bedroom apartment. The apartment building had four vacant units that were being used for storage. At the time of the explosion, a member of the cleaning staff was just finishing servicing one of the recently vacant units; she was injured in the blast while exiting the apartment building and walking down the stairs to her car. This worker’s mother accompanied her on the job that day and was in the just-serviced unit, waiting for her daughter to return with the car, when the explosion occurred; however, the worker’s mother was not injured. Four residents of the apartment

42 See: http://dfw.cbslocal.com/2014/04/04/groundbreaking-symbolizes-hope-in-west-one-year-later/ (accessed on April 4, 2014).

West Fertilizer Company Final Report January 2016 54 U.S. CHEMICAL SAFETY AND HAZARD INVESTIGATION BOARD

complex were treated at Hillcrest Baptist Medical Hospital, and two residents were treated at Providence Health Center for injuries sustained. The explosion completely destroyed West Terrace. The roof and walls of the building completely failed (Figure 36).

Figure 36. West Terrace Apartment Complex East Façade (Source: CSB) 3.4.6 Private Residences According to the Texas Department of State Health Services, the fire and explosion affected many of the homes within a 2-mile radius of the WFC facility. West had a total of 700 homes, and 350 of those were impacted— with 142with homes damaged beyond repair,43 51 homes suffering major damage, 27 homes incurring minor damage, and 130 homes otherwise affected.44 CSB consultants examined damage to 190 single-family residential buildings within a radius of 3,500 feet of the explosion crater45 and documented broken windows, facade damage, and nonstructural and structural component (e.g., wall and roof system) failures (Figure 37). The damage assessments were performed in the majority of the cases by inspecting the perimeter of the property. Access to home interiors was limited because owners either were not present or were unwilling to grant access.

43 Not all homes that were damaged beyond repair have been rebuilt. 44 Clements, Bruce. Texas Department of State Health Services, “The Texas Public Health Response to the West Fertilizer Plant Explosion,” October 8, 2013. See: http://www.astho.org/Preparedness/DPHP-Materials- 2013/WestTexasExplosion/ (accessed on January 18, 2016). 45 CSB contractors assessed damage that was measured to 3,500 feet from the WFC site, but damage occurred beyond that distance.

West Fertilizer Company Final Report January 2016 55 U.S. CHEMICAL SAFETY AND HAZARD INVESTIGATION BOARD

Figure 37. Example of Damage to Single-Family Residential Structure (Source: ABS Consulting) According to the city of West, 259 building permits were issued as of October 2014. Of those, 79 were for building new homes, 117 for remodeling homes, and 63 for making miscellaneous repairs (such as fence, shed, and carport restoration). 3.4.7 Infrastructure Damage to the City of West The explosion at the WFC facility damaged the West city infrastructure; it ruptured water lines, deformed sewer manholes, damaged water storage tanks, further rendered wells unusable, cracked walls of a pump house, and caused the loss of water supply to the community. Access to water was restored gradually as the affected infrastructure was repaired. As a result of the explosion, FEMA assisted the city in repairing some of the damaged infrastructure listed in Table 3, such as water facilities and water lines. Table 3. Infrastructure Repaired with FEMA Funding Affected Infrastructure Cost to Repair Damage Well 4, Ground Storage Tank $365,000

West Fertilizer Company Final Report January 2016 56 U.S. CHEMICAL SAFETY AND HAZARD INVESTIGATION BOARD

Well 4, Pump Station Door and Window $2,000 Davis Street Water Line $74,000 Walnut Street Sewer Manhole $9,200 Total $450,200

The West water system is fed by a 12-inch supply line from the city of Waco at a pump station 11 miles south of West. The pump station supplies 700 gallons per minute, with a storage capacity of 167,000 gallons. Water pressure for homes is usually 48 to 50 psi; however, on the morning after the incident, water pressure was measured at less than 20 psi because of damaged water lines. In response to the abnormal water pressure, the city issued a boil water order. West used two water wells to supply water to the community. The first well had a capacity of 250,000 gallons; however, it had been out of service for about 7 years at the time of the explosion. The second well also had a capacity of 250,000 gallons and was removed from service in January 2013 for rehabilitation.46 This well also was damaged as a result of the explosion but has since been repaired and was back online as of September 1, 2014. The city also has an above-ground water tower with a storage capacity of 150,000 gallons; the tower was nearly drained by the post-explosion fire department response.47 According to CSB interviews conducted with the Abbott Fire Department, West had a history of improperly working water hydrants and consistently low water pressure. Abbott firefighters had previously responded to fires in West and were unable to get hydrants to work adequately. The city had installed the above-ground water tower before the WFC incident to address the issue of low pressure. According to the Mayor of West, “The city generates its revenue in three ways—water and sewer rates, property tax, and sales tax.” During the first 2 months after the explosion, West experienced a loss of income (65 percent of water and sewer revenue and 30 percent of property tax values).48 As of June 2013, the city of West indicated that the fire and explosion at WFC had cost the city $17 million in actual damages; however, the total cost-to-date may be greater as additional demolition, renovation, and construction projects continue throughout the city. On April 15, 2014, the State of Texas provided additional disaster grant assistance49 to the city of West in the amount of $4,853,500 to fund the disaster recovery work on the water plants, water tank rehabilitation, wastewater outfall interceptor, and disaster zone infrastructure repairs.50 The first infrastructure project (costing $400,000) was completed in August 2014 and involved installation of a new well and upgrading of a storage tank located by the new nursing home.

46 State Fire Marshal’s Office. “Firefighter Fatality Investigation,” Investigation FFF FY 13-06 (West, TX). 47 Ibid. 48 See: http://www.cityofwest.com/wp-content/uploads/2012/12/June-2013.pdf (accessed on December 22, 2015). 49 The State of Texas provided an initial $3.2 million disaster grant in August 2013. 50 The State of Texas. Office of the Governor, “Letter to the City of West,” April 15, 2014.

West Fertilizer Company Final Report January 2016 57 U.S. CHEMICAL SAFETY AND HAZARD INVESTIGATION BOARD

  1. 0 Incident Analysis
  2. 1 Fertilizer Grade Ammonium Nitrate (FGAN)
  3. 1.1 The Fertilizer Industry

The Fertilizer Institute defines fertilizer as a “collection of elements needed for plants to grow well.”51 The application of fertilizer to soil provides nutrients for plants to enhance fertility and the production of crops. The primary nutrients for plant nutrition are nitrogen (N), phosphorous (P), and potassium (K). Nitrogen is considered the most important of the three nutrients because it is critical to the formation of protein, which composes the tissue of most living things. Although nitrogen exists in the composition of air, it does not exist in a form that plants can readily absorb. Accordingly, farmers apply fertilizers containing nitrogen compounds to their soils to enhance crop production. Nitrogen is most readily available for plants in its inorganic forms, such as ammonium (NH4+) or nitrate (NO3-) ions. It is applied to crops in different forms such as dry granules, liquid, or injection into the soil as a gas. The largest source of nitrogen by volume in commercial fertilizer is anhydrous ammonia, which is applied directly to crops.52 Other important nitrogen fertilizers include aqueous ammonia (NH3), ammonium sulfate ((NH4)2SO4)), ammonium thiosulfate (H8N2O3S2), calcium nitrate (Ca(NO3)2), sodium nitrate (NaNO3) and FGAN. FGAN, the substance in the fertilizer involved in the West Fertilizer Company (WFC) explosion, is primarily used on pastureland, hay, and fruit and vegetable crops. FGAN is most commonly used in the Southeast and Midwest in the United States, and the largest AN consumers are Missouri (20 percent), Tennessee (14 percent), Alabama (10 percent), and Texas (8 percent). 53 4.1.2 AN Properties AN (NH4NO3) is a salt compound produced by neutralizing nitric acid (HNO3) with anhydrous ammonia (NH3). The AN manufacturing process involves several steps, including solution formation and concentration; solids formation, finishing, screening, and coating; and product bagging, bulk shipping, or both. AN is marketed in different forms depending on its use, but it is primarily manufactured for use in fertilizers or as a precursor in the manufacture of explosives. Liquid FGAN can be sold as a fertilizer or may be concentrated to form a dry solid product. This solid product may be used for fertilizer or fertilizer blends or may be incorporated as part of an explosive. Pure solid AN is a white or grey odorless material that is marketed in several different forms, such as prills, grains, granules, or crystals. Prills are the most commonly produced form and take the shape of spherical pellets. High-density prills are used for FGAN;

51 The Fertilizer Institute. Fertilizer 101, Nourish, Replenish, Grow. Washington, DC: The Fertilizer Institute, 2010: 13. 52 See: https://www.tfi.org/safety-and-security-tools/get-know-fertilizer-retailer/infographics/ammonium-nitrate- infographic (accessed on November 18, 2015). 53 Ibid.

West Fertilizer Company Final Report January 2016 58 U.S. CHEMICAL SAFETY AND HAZARD INVESTIGATION BOARD

low-density porous prills are generally considered technical grade ammonium nitrate (TGAN) or explosive grade ammonium nitrate, both of which are used in the manufacturing of explosives. Chemically, however, these prills are identical; the difference is that small quantities of coatings and stabilizers are added to FGAN to prevent caking and degradation. 4.1.3 AN Hazards Under normal conditions, pure solid AN is a stable material; it usually is not sensitive to mild shock or other typical sources of detonation (such as sparks or friction). However, AN exhibits three main hazards in fire situations:

  1. Uncontrollable fire.
  2. Decomposition with the formation of toxic gases.
  3. Explosion.54

These hazards arise in part because AN is an oxidizer. This classification is demonstrated both by the U.S. Department of Transportation (DOT), which categorizes AN as a Class 5.1 oxidizer,55 and by OSHA, which describes it as an oxidizer in its Explosives and Blasting Agents standard, 29 CFR 1910.109. 56 Significantly, AN is classified as an “explosive” when the prills are produced with more than 0.2 percent carbonaceous material. Carbonaceous material is a substance rich in carbon, such as a hydrocarbon. OSHA defines “oxidizer” as a chemical that “initiates or promotes combustion in other materials, thereby causing fire either of itself or through the release of oxygen or other gases.”57 As an oxidizer, AN can increase the flammability or explosibility (or both) of other combustible substances when it decomposes after exposure to heat. As AN decomposes when in contact with heat or fire, the reactions can release gases such as nitric acid (HNO3), ammonia (NH3), nitrogen oxides (NO, NO2), nitrous oxide (N2O), nitrogen, oxygen, and water vapor, depending on the heat and pressure. Some by- products can be toxic when emitted. During fires, AN presents serious risks of explosion beyond those attributed to its oxidizing properties and ability to decompose and emit toxic gases. When AN is contaminated with organic carbon- containing materials or certain inorganic chemicals, its behavior can become dangerously unpredictable,

54 Resources Safety, Division of Mines and Petroleum. Safe Practice: Safe Storage of Solid Ammonium Nitrate. East Perth, Western Australia: Government of Western Australia, 2013. See: http://www.dmp.wa.gov.au/documents/Code_of_Practice/DGS_COP_StorageSolidAmmoniumNitrate.pdf (accessed on August 4, 2015). 55 U.S. DOT. “Hazardous Material Table,” 49 CFR 172.101. See: http://www.phmsa.dot.gov/portal/site/PHMSA/menuitem.6f23687cf7b00b0f22e4c6962d9c8789/?vgnextoid=d84ddf 479bd7d110VgnVCM1000009ed07898RCRD&vgnextchannel=4f347fd9b896b110VgnVCM1000009ed07898RCR D (accessed on August 4, 2015). 56 See: https://www.osha.gov/pls/oshaweb/owadisp.show_document?p_table=STANDARDS&p_id=9755 (accessed on January 13, 2016). 57 OSHA. See: https://www.osha.gov/dsg/hazcom/ghoshacomparison.html (accessed on August 4, 2015).

West Fertilizer Company Final Report January 2016 59 U.S. CHEMICAL SAFETY AND HAZARD INVESTIGATION BOARD

especially when the AN is confined and in the presence of fire or high heat.58 Thus, when AN is combined with contaminants, its explosive sensitivity increases sharply, and the result can lead to detonation.59 Examples of contaminants include organic chemicals, acids, and flammable and combustible materials.60 4.1.3.1 Decomposition of AN AN has a melting point between 311°F and 337°F (155°C and 169°C). It begins to rapidly decompose at a significant rate soon thereafter.61 When it is exposed to high heat and pressure, AN experiences endothermic (heat-absorbing) and exothermic (heat-producing) reactions simultaneously, causing the compound to split into its constituent molecules and also transforming it from solid state to molten, or liquefied, state. When AN decomposes or breaks down under thermal conditions, at least seven unique reactions can occur at varying temperatures, with different heat outputs and rates of reaction.62 Some reactions can produce toxic and detonable by-products. All of the reaction pathways begin with the AN splitting into gaseous ammonia (NH3) and nitric acid (HNO3), although that step is usually not explicit. In the following main exothermic reaction (Eq. 1), which can occur in conditions up to 482°F (250°C), AN yields nitrous oxide and water: NH4NO3 (s)  N2O (g) + 2 H2O (g) (Eq. 1) Above 482°F (250°C), a reversible endothermic reaction (Eq. 2) takes place at a significant rate, splitting the AN to form ammonia and nitric acid: NH4NO3 (s) ↔ NH3 (g) + HNO3 (g) (Eq. 2) This endothermic reaction is accompanied by a number of exothermic reactions between gaseous ammonia (NH3) and nitric acid (HNO3) that vary by degree, depending on reaction conditions. As previously described, AN is in a liquid or molten state, which is aerated with off-gases such as nitrogen oxides (NO, NO2), water vapor, and nitrous oxide (N2O). This bubbly liquid is much more sensitive to detonation than solid prills or unaerated liquid. Depending on the rate of these endothermic and

58 Greiner, Maurice. “Ammonium Nitrate: Hazards and Handling.” Fertilizer Progress January/February (1983): 26– 38. 59 Sun, J. et al. “Catalytic effects of inorganic acids on decomposition of ammonium nitrate.” Journal of Hazardous Materials B127 (2005): 204–210. 60 The OSHA Explosives and Blasting Agents Standard, 29 CFR 1910.109)(i)(5)(i)(a), lists examples of combustible materials or other contaminating substances, including animal fats, baled cotton, baled rags, baled scrap paper, bleaching powder, burlap or cotton bags, caustic soda, coal, coke, charcoal, cork, camphor, excelsior, fibers of any kind, fish oils, fish meal, foam rubber, hay, lubricating oil, linseed oil, or other oxidizable or drying oils, naphthalene, oakum, oiled clothing, oiled paper, oiled textiles, paint, straw, sawdust, wood shavings, or vegetable oil. 61 CF Industries. “FGAN.” Material Safety Data Sheet Number 004. See: http://www.cfindustries.com/pdf/Amtrate_AN_Fertilizer_SDS_NA_FINAL.pdf (accessed on August 4, 2015). 62 U.S. Department of the Army. Department of the Army Technical Manual, Ammunition, General, TM 9-1300-214. Washington, DC: U.S. Department of Defense, September 1984.

West Fertilizer Company Final Report January 2016 60 U.S. CHEMICAL SAFETY AND HAZARD INVESTIGATION BOARD

exothermic reactions, detonation can occur. Conditions other than heat and pressure, such as pH levels and the presence of impurities, can also influence the rate of reaction.63 The decomposition of AN can be controlled to the extent that the main exothermic reaction (Eq. 1) can be used to produce hospital-grade nitrous oxide.64 However, if the rate of reaction is uncontrolled (which happens, for example, when FGAN is exposed to fire), other reactions can occur as AN decomposes and melts. As the temperature rises over 482°F (250°C), liquid AN becomes less dense and contains many small bubbles of gaseous decomposition products and their reactants, primarily water vapor and nitrous oxide. At 500°F (260°C), liquid AN becomes much more sensitive to shock because these bubbles act as “hot spots” that focus the shock or magnify the energy input. Many tests have shown the direct correlation between temperature and sensitivity in molten AN.65 In other words, molten AN becomes more sensitive as the temperature under which it is kept rises. Although the exact sequence of chemical reactions is variable, the primary end products of the detonation process are consistently water, nitrogen (N2), and oxygen (O2). As reactions involving nitric acid (HNO3) and ammonia (NH3) (Eq. 2) produce these end products, heat is released, which adds energy to a detonation. The nitrous oxide (N2O) production process (Eq. 1) combines all of the internal fuel (hydrogen) with the oxygen from nitric acid to form water, so no additional oxidation can take place in the pure AN during the detonation reaction. The difference between the uncontrolled detonation reaction and the nitrous oxide reactions is the rate of the reaction and the formation of the triple bond in N2 and the double bond in O2, which are exothermic and therefore add to the energy yield during detonation. The following formula (Eq. 3) describes this overall decomposition reaction from the intermediate reactions where AN yields nitrogen, oxygen, and water: NH4NO3 (s)  N2 (g) + ½ O2 (g) + 2H2O (g) (Eq. 3) When mixed with AN, many combustible contaminants—including organic materials, fuels, and finely divided materials (e.g., flour, seed or grain dusts, asphalt or fuel oil, or very small metal flakes)—will provide additional fuel that can combine exothermically with the oxygen produced during detonation. Thus, for explosive uses, AN is nearly always combined with a fuel source. This approach increases the energy of the intended explosion and also reduces the toxicity of the end products by reducing nitrogen

63 Lees, F.P., and M.L. Ang (eds.). Safety Cases Within Control of Industrial Major Accident Hazards (CIMAH) Regulations, Chapter 9. Butterworth-Heinemann, 1984; January 1, 1989: 160. 64 Asia Industrial Gases Association. Safe Practices for the Production of Nitrous Oxide from Ammonium Nitrate, AIGA 080/13. Singapore: Asia Industrial Gases Association, 2013. See: http://www.asiaiga.org/docs/AIGA%20080_13%20Safe%20practices%20for%20the%20production%20of%20nitro us%20oxide%20from%20ammonium%20nitrate.pdf (accessed on November 19, 2015). 65 Van Dolah, R.W. et al. Explosion Hazards of Ammonium Nitrate Under Fire Exposure. Washington, DC: U.S. Department of the Interior, Bureau of Mines, 1966. See: http://www.osmre.gov/resources/blasting/docs/USBM/RI6773ExplosionHazardsAmmoniumNitrateUnderFireExpos ure.pdf (accessed on December 22, 2015).

West Fertilizer Company Final Report January 2016 61 U.S. CHEMICAL SAFETY AND HAZARD INVESTIGATION BOARD

oxide (NOx) production. Nitrogen oxides are produced, for example, by the following reaction (Eq. 4), which shows AN yielding nitrogen, water vapor, and nitrogen oxides: 4NH4NO3 (s)  2NO2 (g) + 8H2O (g) + 3N2 (g) (Eq. 4) An example of fueling AN to produce a blasting agent is the addition of fuel oil at around 6 percent by weight to produce ammonium nitrate/fuel oil (ANFO). ANFO may be used for mining and other purposes. Moreover, the military uses a mixture of fuel-rich trinitrotoluene (TNT), AN, and sometimes aluminum to produce a more effective explosive than TNT alone.66 4.1.4 Previous Incidents Involving FGAN AN-related explosions have occurred ever since large-scale AN production began in the late 19th century.67 One of the earlier notable explosions involving FGAN took place in Oppau, Germany, in 1921, when workers fired explosives into a caked mixture of fertilizer to loosen 4,500 tons of ammonium sulfate (AS) and FGAN. The explosion killed 500 to 600 people, injured an additional 2,000 more, and caused as much as $1.7 million (US) in property damage, destroying 80 percent of the city.68 Today, that property damage would equate to more than $22 million.69 Since then, a number of other FGAN incidents have occurred that involved a major fire, explosion, or both. This report highlights the following four incidents involving FGAN because they provide important information about the behavior of FGAN when exposed to fire: • Cherokee incident (1973). A fire in the storage building of FGAN producer Cherokee Nitrogen resulted in an FGAN detonation in Pryor Creek, OK. Of the 14,000 tons of FGAN in storage, only a few tons were involved. The detonation was believed to have been underneath a front-end loader parked in an area with FGAN on the floor and might have been initiated by one of the loader’s components exploding. It was theorized that contamination of the FGAN with flammable fluids in the loader occurred before the detonation. The detonation occurred 25 minutes after the fire was discovered but did not propagate into the main pile.70 • Cory’s Warehouse incident (1982). A fire in a warehouse storing wooden furniture, charcoal, and more than 3,000 tons of bagged FGAN and mixtures based on FGAN produced some deflagration of the FGAN but no detonation.71 Several small explosions occurred but were thought to be due

66 Ibid. 67 Barbrauskas, Vytenis. “Explosions of Ammonium Nitrate Fertilizer in Storage or Transportation Are Preventable Accidents.” Journal of Hazardous Materials 304, 5 (2016): 134–149. 68See: http://www.aria.developpement-durable.gouv.fr/wp-content/files_mf/FD_14373_oppau_1921_ang.pdf (accessed on December 19, 2015). 69 The CPI Inflation calculator. See: http://data.bls.gov/cgi- bin/cpicalc.pl?cost1=1%2C700%2C000&year1=1921&year2=2014 (accessed on December 30, 2014). 70 Freeman, R. “Cherokee Ammonia Plant Explosion.” Chemical Engineering Progress 71, 11 (1975). 71 A deflagration occurs when a combustion wave propagates at a velocity less than the speed of sound. A detonation is a combustion wave that propagates at a velocity greater than the speed of sound. Detonations create high-pressure shock waves that can cause damage at large distances from the source.

West Fertilizer Company Final Report January 2016 62 U.S. CHEMICAL SAFETY AND HAZARD INVESTIGATION BOARD

to reactions between sodium nitrate and charcoal. More than 1,000 people were evacuated, and controlling the fire took 6 hours. • EDC incident (2009). A fertilizer distribution facility in Bryan, Texas, caught fire and completely burned. Firefighters withdrew and evacuated the area. Unlike the West fire, the Bryan AN-related fire produced light-colored smoke as burning progressed, indicating that the fire was ventilated. No explosion occurred, and after the fire, much of the FGAN was still there. Some of the FGAN melted, spread away from the pile, and then re-solidified in a dark mass. The FGAN remaining in the pile had a black crust on it, but beneath that crust, the prills appeared to be unaffected.72 • East Texas Ag Supply incident (2014). A fertilizer warehouse in Athens, Texas, caught fire and burned. The warehouse was near the center of town, and the first responders evacuated the area as rapidly as possible. No explosion occurred. The walls of the structure were masonry, but the bins and roof structure were wood.73

A more comprehensive list of FGAN incidents involving fires and explosions is provided in Appendix B. 4.1.5 Historical Knowledge of AN Fire and Explosion Hazards Over the years, the explosibility and fire hazards of AN have been the subject of a number of research papers. Some of those papers were first published through the U.S. Department of Agriculture (USDA),74 U.S. Bureau of Mines,75 and other sources abroad. In 1945, a USDA-archived publication discussed in detail the properties of pure AN, based on worldwide research conducted up to that date.76 The paper notes the following: • Under favorable conditions of pressure, rapid heating, and retention of heat, AN may be exploded partially from heat alone near 300°F. • AN can detonate if subjected to a very strong initial impulse. • Six factors influence the sensitivity of AN toward an explosion: temperature, strength of initial impulse, density, packing, particle size, and moisture content of the material. Later, the Bureau of Mines (U.S. Department of the Interior) published reports on its investigation of the detonation of AN.77 Some of the key findings of a 1966 Bureau of Mines report indicated the following: • No transition to detonation of AN occurred in numerous burning experiments.

72 CSB conducted an assessment of the Bryan, Texas, incident. 73 CSB collected information after the Athens, Texas, incident. 74 Davis, R.O.E. “Explosibility and Fire Hazard of Ammonium Nitrate Fertilizer,” no. 719. Washington, DC: U.S. Department of Agriculture, 1945. 75 Van Dolah, R.W. et al. “Explosion Hazards of Ammonium Nitrate under Fire Exposure,” R. I. 6773. Pittsburgh: Bureau of Mines, 1966. 76 See: https://ia601703.us.archive.org/1/items/explosibilityfir719davi/explosibilityfir719davi.pdf (accessed on January 6, 2016). 77 In 1961, the Manufacturing Chemists’ Association asked the Bureau of Mines to investigate the potential explosion hazards of AN under the conditions of fire exposure that could occur in storage and transportation incidents.

West Fertilizer Company Final Report January 2016 63 U.S. CHEMICAL SAFETY AND HAZARD INVESTIGATION BOARD

• The critical diameter (minimum diameter to sustain detonation) of AN was quite small when just below the melting point. • Initiation of prills by oxygen-acetylene gas detonation was shown to be unlikely. • Detonations were achieved with fuel added in vessels with restricted vents. • The initiation of detonation in AN from fire exposure in normal storage is quite improbable. • The chance of modern AN detonating as the result of fire has been considered to be small or even nonexistent. • The initial shock need not have an amplitude adequate for immediate initiation of detonation. • Failure to detonate at a small scale should not be interpreted as meaning that the material is incapable of detonation. • An acetylene-oxygen mixture in a 3-inch tube failed to detonate hot pulverized AN prills. No attempt was made to initiate detonation in foaming liquid AN by using a gas mixture. • Large fire tests with bagged AN showed that heat penetrated less than 2 inches into the prills and that a crust formed, preventing liquid from penetrating the prills.78 The Bureau of Mines conducted a large-scale study (also in 1966) to determine distances for safe storage of AN. Cardboard tubes 1 meter in diameter were used as the donors and acceptors (the donor is detonated conventionally, and the acceptor, which is placed at a test-determined distance from the donor, either detonates or fails in each test). ANFO was the donor, and the acceptors were ANFO and straight AN. The tests were well documented and were of sufficient scale to produce reliable results. One of the findings was that sheet metal covering the donor increased the distance where sympathetic detonation (a follow-on detonation induced by the explosive effects of an initiating explosion) occurred. In a case with ANFO as the acceptor, a sympathetic detonation was produced over a 50-foot gap. With straight AN, the maximum gap was 19 feet. Without the metal, the gap was 12 feet for AN. The Bureau of Mines also conducted tests at smaller diameters, but no detonation was initiated in AN. One significant finding was that “strong evidence exists that the apparent insensitiveness of AN results largely from a manifestation of critical diameter effects,” highlighting the importance of scale. When evaluating test results, small-scale tests are not reliable indicators of large-scale behavior. In December 1997, EPA published an alert, “Explosion Hazard from Ammonium Nitrate,” with the following recommendations:79 • Avoid heating AN in a confined space (e.g., consider that processes involving AN should be designed to avoid this possibility). • Avoid localized heating of AN, which potentially leads to development of high-temperature areas. • Ensure that AN is not exposed to strong shock waves from explosives.

78 Van Dolah, R.W. et al. “Explosion Hazards of Ammonium Nitrate under Fire Exposure,” R. I. 6773. Pittsburgh: Bureau of Mines, 1966. 79 See: http://nepis.epa.gov/Exe/ZyPDF.cgi/P100BH59.PDF?Dockey=P100BH59.PDF (accessed on November 19, 2015).

West Fertilizer Company Final Report January 2016 64 U.S. CHEMICAL SAFETY AND HAZARD INVESTIGATION BOARD

• Avoid contamination of AN with combustible materials or organic substances, such as oils and waxes. • Avoid contamination of AN with inorganic materials that can contribute to its sensitivity to explosion, including chlorides and some metals, such as chromium, copper, cobalt, and nickel. • Maintain the pH of AN solutions within the safe operating range of the process, in particular avoiding low pH (acidic) conditions. This alert was later expanded in August 2013 as a joint EPA, OSHA, and ATF advisory, “Chemical Advisory: Safe Storage, Handling, and Management of Ammonium Nitrate.” A June 2015 revision refers explicitly to AN prills.80 4.2 Factors Contributing to the Massive Fire and Explosion at the WFC Because of the unpredictable behavior of FGAN in fire situations, the scenario that contributed to the detonation at the WFC might never be precisely determined; however, several detonation scenarios are plausible. CSB identified two factors or conditions that likely contributed to the intensity of the fire and detonation: (1) the contamination of FGAN with materials that served as fuel and (2) the nature of the heat buildup and ventilation of the FGAN storage space. These factors and scenarios for how the FGAN behaved on the night of the incident are based on the physical evidence that remained, blast analysis commissioned by CSB, U.S. Army Corps of Engineers crater analysis of the WFC explosion, eyewitness accounts, and previous research on FGAN incidents and testing. 4.2.1 Contamination of the FGAN Pile In fire situations, the behavior of FGAN is unpredictable, in part because of the number of endothermic and exothermic decomposition reactions that take place with increasing temperature. FGAN decomposition reactions beyond the first step have yet to be uniquely defined, and subsequent decomposition reactions of FGAN can only be assumed.81 When contaminants are added to AN, the decomposition reactions become increasingly more complex.82 Possible sources of contamination in an FGAN storage area can include ignitable liquids, finely divided metals or organic materials, chloride salts, carbons, acids, fibers, and sulfides. These contaminants can increase the explosive sensitivity of FGAN.

80 EPA, OSHA, and ATF. “Chemical Advisory: Safe Storage, Handling and Management of Solid Ammonium Nitrate Prills.” See: http://www2.epa.gov/sites/production/files/2015-06/documents/an_advisory_6-5-15.pdf (accessed on December 7, 2015). 81 Cagnina, Stefania; Rotureau, Patricia; and Carlo Adamo. “Study of Incompatibility of Ammonium Nitrate and its Mechanism of Decomposition by Theoretical Approach.” Chemical Engineering Transactions 31 (2013). See: http://www.aidic.it/lp2013/webpapers/141cagnina.pdf (accessed on December 7, 2015). 82 Ibid.

West Fertilizer Company Final Report January 2016 65 U.S. CHEMICAL SAFETY AND HAZARD INVESTIGATION BOARD

The molten FGAN at the WFC likely came in contact with contaminants that were stored in the fertilizer warehouse or were produced during the fire that preceded the explosion. Seed materials, zinc, and other organic products, including the wood-constructed bins, were present near the FGAN storage area or could have come in contact with molten FGAN. During the fire, soot from the smoke and also collapsing wood and roofing material might have mixed with the FGAN pile. The presence of possible contamination in the FGAN pile can be evidenced by changes in the smoke observed in the WFC fire before the explosion. The earliest sign of the WFC fire was white smoke streaming from vents in the elevator cupola on top of the fertilizer warehouse that stored the FGAN. Light-colored smoke is evidence of a well-ventilated fire, which would be typical of the early phase of a structure fire before it depletes the oxygen in the room. The initial smoke observed at the WFC was from the incipient fire, now believed to have started in the seed room. Shortly after authorities were notified, the smoke darkened and became opaque, indicating large quantities of soot83 or hydrocarbons burning (Figure 38). Such soot can be the result of a ventilation-limited fire or a soot-producing fuel such as plastic or asphalt, which produces large amounts of soot even in well-ventilated fires.84 The fact that smoke was observed coming from the same room that held the FGAN bin suggests that the bin was burning at that time. It is likely that soot or molten asphalt began accumulating on the AN shortly after the fire spread to the roof and the FGAN bin. The soot provided a source of fuel as it contaminated the surface of the pile. Soot also greatly increases the absorption of radiant heat from a fire.85

Figure 38. Initial Light Smoke (left) Followed by Dark Plume (right) (Source: Member of the Public)

83 Soot is finely divided carbon deposited from flames during the incomplete combustion of organic substances. 84 Fire Development and Behavior Indicators. See: http://cfbt-us.com/pdfs/FBIandFireDevelopment.pdf (accessed on November 19, 2015). 85 Glassman, Irvin and Yetter, Richard. Combustion. Burlington, MA: Academic Press, 2009: 458.

West Fertilizer Company Final Report January 2016 66 U.S. CHEMICAL SAFETY AND HAZARD INVESTIGATION BOARD

  1. 2.2 Heating and Ventilation

As the fire progressed, the available oxygen in the building was depleted as it was consumed in the fire. Although the fertilizer warehouse structure had some ventilation louvers in the cupola at the top, ventilation at ground level was limited to only a few louvered vents and the normal infiltration that exists around doors. The limited ventilation increased the quantity of soot in the smoke and the potential contamination of the FGAN pile. The path of the fire from the seed room to the main structure is unknown, but an opening, perhaps resulting from an interior wall or the roof burning, seems to have allowed hot smoke and later flame to flow from the seed room into the main structure and out the cupola. Initially, no flames were visible at the cupola, but as the fire progressed, videos and photographs taken before the explosion show the fuel-rich smoke generated by the burning material inside the structure. Subsequently, asphalt roof shingles ignited and began burning vigorously. With limited ventilation inside the structure, a hot layer of smoke likely would have developed in the upper portion of the room containing the FGAN bin. Because cooler air settles below warmer air, the air temperatures would have remained relatively cooler inside the bin. The ground-hugging nature of the evolving smoke plume, as evidenced in Figure 39, is a characteristic of partially cooled smoke, perhaps cooling as it passed through the elevator structure before it exited the cupola. Because the elevator likely was filled with opaque black smoke, radiant heat from the fire on the FGAN pile would be reduced because the opaque black smoke shielded the pile from the heat.

Figure 39. Dark and Heavy Smoke, Rich in Soot (Source: Member of the Public) At some point around 5 to 6 minutes before the detonation, the character of the fire changed, according to eyewitness accounts and photographic evidence (Figure 40). This change was most likely caused by increased ventilation through an opening low in the building, possibly when the fire burned through the seed room doors or the roof. The fire also might have been enhanced by oxidizing gases from the heated FGAN pile.

West Fertilizer Company Final Report January 2016 67 U.S. CHEMICAL SAFETY AND HAZARD INVESTIGATION BOARD

Figure 40. Photographs from 7:42 pm (left) and 7:45 pm (right), Showing Transition to Lighter Smoke and Larger Flame, Before Detonation at Approximately 7:51 pm (Source: Member of the Public) The additional ventilation caused a marked decrease in dark smoke and probably was accompanied by a major increase in heat radiation inside the fertilizer building because of increased oxygen availability to the burning wood and other fuels. With the dark smoke inside of the structure reduced, radiant heat would reach the surface of the FGAN in the bin, and the increased airflow through the building would greatly increase the radiant heat flux by raising the temperature of the burning wood. The surface of the FGAN, covered with soot or molten asphalt, would absorb the heat flux and cause a very rapid heating of the surface of the FGAN pile. The very hot and contaminated surface of the pile was then sensitive to detonation. If the building had been well ventilated, the ventilation-limited phase of the fire would not have been as prolonged, reducing the amount of soot and creosote on the pile. In this scenario, the increased intensity of the fire would heat the FGAN pile. The lighter color smoke would allow more heat to be reflected, and the liquid FGAN might have run off as it developed. CSB collected data on similar incidents at the facilities in Bryan, Texas, and Athens, Texas. These incidents demonstrate that an FGAN pile can experience a major structure fire without detonating. The plumes of smoke at the Bryan facility (Figure 41) and Athens facility indicated cleaner-burning fires with less soot production. One source of the difference in the fire plumes might be the level of ventilation inside of the structure, as described to CSB investigators by the Athens fire chief. Some materials, such as asphalt and polyvinyl chloride (PVC), will

West Fertilizer Company Final Report January 2016 68 U.S. CHEMICAL SAFETY AND HAZARD INVESTIGATION BOARD

produce dark plumes even when burning in the open air, but if that smoke production is outside of the structure, no contamination of the FGAN will occur.

Figure 41. Plume of Smoke from AN Fire in Bryan, Texas (Source: College Station Fire Department) 4.3 Detonation Scenarios CSB found that contamination (likely from the storage of nearby combustibles or the combustible materials used to construct the FGAN bins and building) and the lack of ventilation were contributing factors that ultimately led to the detonation. However, the exact behavior of the FGAN—specifically how the contaminants, decomposition by-products, ventilation issues, or a combination of those conditions led to the explosion—may never be known. Previous studies indicated that a detonation of modern FGAN prills under normal standard storage conditions when exposed to fire (unconfined storage without the potential for pressure buildup) was highly unlikely based on a number of factors. Therefore, the three scenarios in this section are considered plausible, but large-scale testing is needed to estimate their relative likelihood. One of the three scenarios (or a combination) is considered plausible as an explanation of event sequences: • Scenario 1: Detonation from the top of the FGAN pile. • Scenario 2: Detonation in heated FGAN along exterior wall exposed to fire. • Scenario 3: Detonation in elevator pit that spread to main FGAN bin.

West Fertilizer Company Final Report January 2016 69 U.S. CHEMICAL SAFETY AND HAZARD INVESTIGATION BOARD

  1. 3.1 Scenario 1: Detonation from the Top of the FGAN Pile

Based on the location of the pile and the properties of the bin along with the circumstances of other fire- induced incidents, one possible scenario is that a period of contamination with soot and other organics (possibly including molten asphalt and plastic dripping from the burning composite shingle roof and PVC drop pipe from the elevator mechanism) was followed by about 5 to 6 minutes of intense radiant heating from the flames above and adjacent to the main FGAN bin. During this time, a layer of very hot, contaminated, and sensitive liquid FGAN could have built up on the pile. The foaming FGAN likely produced oxidizing gases, and those mixed with flammable smoke to produce a detonable gas cloud over the FGAN pile in the main bin and possibly in an adjoining bin linked to the main bin through a series of holes cut in the partition between the bins. The cloud consisted of powerful oxidizers that would be expected when FGAN undergoes thermal decomposition—such as NO2, O2, and HNO3 as wells as fuel- rich smoke and pyrolysis86 products off-gassing from the molten FGAN. The gas cloud then might have ignited from above, undergoing a gas-phase deflagration-to-detonation transition (DDT) in the confinement of the bin. This transition could have been enhanced by the passage of the burning front through the openings between the main and secondary bins, which possibly contained a few hundred pounds of FGAN, in a process known as hot gas injection.87 Given the powerful oxidizers and mixture of fuels possible in this environment, a direct gas-phase DDT in the partial containment of the main bin by itself might be another possible initiator. This gas detonation then initiated an explosive train on the surface of the pile (Figure 42), moving through the contaminated and sensitive low-density foam, into the mixture of high-density foam and prills beneath, and then into the ambient prills composing the bulk of the pile.

86 Pyrolysis is the chemical decomposition of a substance by heat. 87 Byers, Kenneth J. “Pressure Piling and Other Issues Affecting Flameproof Enclosures.” Redbank, Australia: Testing and Certification Centre, SIMTARS, 1996.

West Fertilizer Company Final Report January 2016 70 U.S. CHEMICAL SAFETY AND HAZARD INVESTIGATION BOARD

Figure 42. Potential Explosive Train Layers on AN Pile Before Detonation (Source: CSB) In tests using 1-meter (diameter) cardboard tubes, ambient temperature FGAN has been detonated by a 10-centimeter layer of ANFO at the end of the tube, initiated by a flat shock wave.88 If a large portion of the surface of the AN pile was detonated by a gas explosion and if the sensitized layer detonated, then the minimum diameter for unconfined FGAN prills (around 1 meter) would be exceeded, and the detonation could potentially proceed through the pile in a complete detonation. In many historical accidents, only part of the AN detonates because of the inability of the detonation wave to spread from a small detonation source into the main pile.89 This type of incomplete or partial detonation does not seem to have occurred at the WFC; the crater and blast damage indicate a complete detonation of the main pile, however it is unknown how much of the FGAN burned prior to the explosion. Falling material from a roof collapse has been proposed as a possible initiator in previous accidents, but subsequent testing of falling objects and high-speed projectiles entering solid and molten FGAN did not support this scenario. Although tests have shown that high-velocity impacts (such as those from high-

88 Winning, C.H. “Detonation Characteristics of Prilled Ammonium Nitrate.” Fire Technology 1, 1 (1965): 23. 89 Freeman, R. “Cherokee Nitrogen Co., Pryor OK.” Chemical Engineering Progress 71, 11 (1975).

West Fertilizer Company Final Report January 2016 71 U.S. CHEMICAL SAFETY AND HAZARD INVESTIGATION BOARD

caliber bullets) can detonate molten FGAN, the low velocities of falling objects do not appear to provide the energy density needed to detonate even sensitized FGAN.90 Fragments from a fire-induced explosion—such as the materials that might be produced in a hot steel roller with FGAN trapped inside—are another potential initiation source at the top of the pile but likely would not create the large flat shock wave required to fully detonate FGAN. No known vehicles or pressure tanks were close enough to the bin to produce high-speed fragments or a strong shock wave on the top of the FGAN pile. A golf cart was in the seed room, and fire extinguishers and an air conditioner could have failed from overpressure due to overheating, but they were separated from the FGAN bin by the substantial walls of the bin and are unlikely to have produced high-speed fragments. As other researchers have noted, the common element linking recent fire-induced FGAN detonations is some level of confinement.91 At the WFC building in West, the confinement was the wooden bin, whereas in the transportation accidents in Mexico and Romania cited in the reference, the confinement was the semitrailer. The confinement provided by a wooden bin or a trailer would not allow sufficient pressure to build up to support a solid-phase DDT92 but could allow the gases escaping the heated FGAN to accumulate over the pile. Additional field testing of this possibility would be useful. 4.3.2 Scenario 2: Detonation in Heated FGAN Along Exterior Wall Exposed to Fire Another possible scenario is that the detonation at the WFC facility was initiated along one of the exterior walls of the bin. The north and east sides of the bin were exposed to the fire and could have been heated through the walls. No evidence indicates that the bin failed during the fire, although that cannot be ruled out, so the side of the FGAN pile likely would have no direct contact with flame, but some heat could have penetrated through the wall of the bin—more heat if the exterior wall adjacent to the seed room was penetrated and fire entered the space between the exterior sheathing and the plywood bin lining. Figure 43 shows some of the features of the fire on the north side of the structure a few minutes before detonation. The structure above the bin had lost its siding and was burning with good air flow. Flames were appearing through the siding outside the bin, indicating that the wooden exterior sheathing and roofing were beginning to burn. The seed room was just a burning frame, and most of its roof had burned and collapsed.

90 Van Dolah, R.W. et al. Explosion Hazards of Ammonium Nitrate Under Fire Exposure. Washington, DC: U.S. Department of the Interior, Bureau of Mines, 1966. See: http://www.osmre.gov/resources/blasting/docs/USBM/RI6773ExplosionHazardsAmmoniumNitrateUnderFireExpos ure.pdf (accessed on November 19, 2015). 91 Nygaard, E.C. “Large Scale Testing of Ammonium Nitrate.” 4th EFEE World Conference of Explosives and Blasting 4(1), 2007. 92 Van Dolah, R.W. et al. Explosion Hazards of Ammonium Nitrate Under Fire Exposure. Washington, DC: U.S. Department of the Interior, Bureau of Mines, 1966. See: http://www.osmre.gov/resources/blasting/docs/USBM/RI6773ExplosionHazardsAmmoniumNitrateunderFireExpos ure.pdf.pdf (accessed on December 22, 2015).

West Fertilizer Company Final Report January 2016 72 U.S. CHEMICAL SAFETY AND HAZARD INVESTIGATION BOARD

Figure 43. North Side of Structure Approximately 3 Minutes Before Detonation, with Dark Foreground Objects Associated with the Bin Complex North of Fertilizer Building (Source: Member of the Public) Even with some heating of the pile through the bin wall, it is difficult to envision a potential detonation source; FGAN does not normally detonate when heated except under severe confinement.93 Contamination also would be less likely in the FGAN exposed to heat along the exterior seed room wall, but some liquid AN, contaminated by soot and roofing components, on the pile surface might have penetrated along the heated wall of the bin if the temperature was high enough or the wall was partially breached. A small amount of wood from the bin also might be nitrated by nitric acid off-gassing from the heated FGAN to form nitrocellulose, but such a reaction has not been observed in testing, and no research papers supporting such a scenario were found. The WFC facility had a concrete floor that would have prevented heating of the pile from the bottom. Bin failure, preceded by leakage of the FGAN or FGAN liquid onto burning material such as seed or plastic cannot be ruled out. Because the bin floor was well above the floor of the seed room, the falling material would have some momentum and could produce

93 Arthur D. Little, Inc. Study of Ammonium Nitrate Materials. Springfield, VA: National Technical Information Service, 1952: 1–49. See: http://www.dtic.mil/dtic/tr/fulltext/u2/786334.pdf (accessed on November 19, 2015).

West Fertilizer Company Final Report January 2016 73 U.S. CHEMICAL SAFETY AND HAZARD INVESTIGATION BOARD

significant pressure under ideal conditions. Whether this situation could lead to a detonation is an open question. 4.3.3 Scenario 3: Detonation in Elevator Pit That Spread to Main FGAN Bin Another possible detonation scenario focuses on the elevator pit near the FGAN bin. A fiberglass lid covered the pit, and the floor sloped away from the pit to prevent runoff from entering it, but the fire might have melted the cover, and FGAN remnants could have been in the pit. The typical elevator mechanism would not provide any areas for strong confinement leading to high pressures, nor does it seem plausible that a small detonation in the pit could have initiated the main FGAN pile. If the detonation began in the pit, then the most feasible mechanism would be a collapse of the west wall of the bin, spilling FGAN into a mixture of burning rubber from the melted elevator belt and residual FGAN in the bottom of the pit. The mass of the falling FGAN, combined with the strong confinement of the concrete pit walls, might have provided the conditions for a solid phase DDT beginning in the bottom of pit and spreading into the main pile. The likelihood of sufficient FGAN near the door, where the pit was located, seems quite low. Liquid FGAN, if it somehow leaked into the pit, would have been under confinement conditions similar to those for liquid in the bin, with no obvious areas where pressure could build. The elevator itself is a belt with cups protected by a sheet metal box open at the top and bottom. The belt that brought the material in from the unloading pit outside provides no obvious containment other than the rollers, which are often hollow metal. Unlike the rollers above the bin, these rollers would have been shielded from the heat of the main fire but could have been heated by a fire (if it existed) in the pit. Molten and contaminated FGAN on the floor, initiated by an explosion from a burning loader, was suspected in the 1973 Cherokee FGAN storage explosion, but no known source of an initiating detonation existed at the WFC, and the detonation at Cherokee did not propagate into the main pile. The circumstances of the two accidents were too different to draw any firm conclusions about the role of molten AN in the detonations. Other fires involving FGAN (such as the fires in Bryan, Texas, and Athens, Texas) did not result in detonation, even though the fires totally consumed the structures housing the FGAN bins and the roofs collapsed. This evidence demonstrates the unpredictable behavior of FGAN exposed to fire. Possible differences between the fire incidents and the WFC are ventilation of the fire, which determines the degree of contamination from smoke products; level of confinement in the bin; and degree of direct heating on the FGAN pile. 4.4 Forensic Testing of West Fertilizer Company Samples On the day before the explosion, the WFC sold 8,000 pounds of an FGAN/AS blend of fertilizer to a farmer in Abbot, Texas. The farmer told CSB investigators that the fertilizer he received, which he estimated was about 75 percent FGAN and 25 percent AS, was dustier than usual during spreading. After

West Fertilizer Company Final Report January 2016 74 U.S. CHEMICAL SAFETY AND HAZARD INVESTIGATION BOARD

the incident, the Office of the Texas State Chemist (OTSC) retained a portion of the fertilizer and provided a sample to CSB for further testing. The OTSC is part of the Texas A&M University System and administers the requirements of the Texas Feed and Fertilizer Control Service. The OTSC regulates the sale of fertilizer and also conducts laboratory testing of FGAN to ensure that it meets quality guidelines for fertilizer. The OTSC conducted testing of the samples and shared the results with CSB. The OTSC spectral analysis found no activated carbon or any evidence of contamination of the FGAN sample. According to the report, the testing concluded that the sample was a mixture of FGAN and AS. The OTSC ran a nitrogen analysis in the state’s combustion laboratory; this is a routine test run by the OTSC to check the concentration of nitrogen in fertilizers. The OTSC determined that the amount of nitrogen contained in the FGAN/AS sample mixture had nitrogen percentages that ranged from 34.33 to 34.61 percent.94 The laboratory also conducted tests to determine the particle size distribution of the prills in the farmer’s FGAN/AS sample. Results verified that the FGAN/AS samples had high concentrations of fines (smaller broken-down prills). Approximately half (50 to 55 percent) of the farmer’s sample consisted of particles smaller than 200 micrometers (0.2 millimeters). Operating under the assumption that the farmer’s sample was a blend of FGAN and AS prills, the laboratory obtained a control sample of FGAN and AS mixed in 70:30 portions, respectively. The control sample contained 10 percent particles smaller than 200 micrometers. Although the farmer’s sample included a larger than usual number of fines, the particle sizes in this sample are not necessarily representative of the FGAN in the main bin at the WFC because of the addition of AS to the farmer’s mixture. Mechanical action such as blending might have taken place when creating the FGAN/AS mixture, reducing the particle size, and further breakage might have occurred during transit. CSB investigators collected samples of the fertilizer remaining at the WFC facility and the OTSC and in March 2015 commissioned a forensics laboratory to characterize the composition of eight samples by semi-quantitative analysis. Samples 1 through 5 were categorized as solidified and pulverized fertilizer collected from various bins (Figure 44); sample 6 was collected from the FGAN railcar on the WFC property that was the least disturbed by the explosion and firefighting efforts (Figure 45); and samples 7 and 8 were collected from the FGAN mixture purchased by the farmer on the day before the incident (Figure 46). According to shipment records, the railcar contained pure FGAN manufactured by CF Industries. The railcar arrived at the WFC site in early April 2013. At the time of the incident, the WFC had not yet unloaded the railcar. The WFC also received truckloads of EDC pure FGAN product in early April 2013. CSB is unable to conclude whether the CF Industries or EDC product, or a mixture of both, was present in the FGAN main bin at the WFC facility at the time of the explosion.

94 The percent of nitrogen (34 percent minimum) is typical for a high-density FGAN prill.

West Fertilizer Company Final Report January 2016 75 U.S. CHEMICAL SAFETY AND HAZARD INVESTIGATION BOARD

Figure 44. Solidified Fertilizer Collected from WFC Property (Approximate Location Unknown) (Source: Forensic Laboratory)

Figure 45. FGAN Prills Collected from a Railcar on WFC Property (Source: Forensic Laboratory)

Figure 46. Farmer’s Sample of FGAN and AS Blend (Source: Forensic Laboratory)

West Fertilizer Company Final Report January 2016 76 U.S. CHEMICAL SAFETY AND HAZARD INVESTIGATION BOARD

The laboratory used infrared spectroscopy and electron microscopy methods to determine the elemental compositions of each sample. Results of this testing confirmed the presence or absence of AN and other salts in some of the samples. Four of the eight samples (1, 2, 3, and 5) contained no FGAN (Table 4). The sample collected from the railcar (no. 6) was determined to contain wholly AN with 36 percent95 nitrogen and had a prill density of 1.59 grams per cubic centimeter (g/cm3).96 The railcar sample consisted of prilled particles with a polyolefin coating, which is commonly applied to reduce caking.97 Magnesium nitrate or magnesium oxide is also occasionally used as an additive to FGAN prills during the manufacturing process.98 The purpose of the additive is to act as a desiccant (absorbs moisture) and also to protect against the breakdown of prills at higher temperatures.99 CSB concluded that the chemical composition of the FGAN obtained from the rail car (no. 6) was typical of FGAN prills commonly used for fertilizer and for creation of fertilizer blends.

Table 4. Forensic Testing Results of Fertilizer Samples Collected from the WFC and the OTSC

95 FGAN prills typically contain about 34 percent nitrogen. The 36 percent nitrogen result in the sample is likely attributed to the percent error in the analytical method used. The laboratory conducted a linear regression analysis to determine the percentage error in the determination of elemental sulfur in the FGAN/AS samples compared to a control sample, and it estimated the error to be within +/- 0.3 percent of the sample. The laboratory concluded that the percentage error estimates would be similar for oxygen and nitrogen in the samples that underwent electron dispersive spectroscopy (EDS) methods. 96 FGAN is a higher-density prill in the range of 1.72 g/cm3. 97 According to the FGAN Safety Data Sheet (SDS) from CF Industries, the FGAN prills contain a 0 to 0.2 percent proprietary polyolefin conditioning agent. 98 Ammonium nitrate particulate fertilizer and method for producing the same. See: http://www.google.com/patents/US5720794 (accessed on November 25, 2015). 99 U.N. Industrial Development Organization. Fertilizer Manual, 3rd Edition. The Netherlands: Kluwer Academic Publishers, 1998: 227. No. Sample Location (if known) Sample Description Detected Compounds FGAN Detected 1 Unknown White and pink encrusted and prilled layers AS, magnesium phosphate (with iron), potassium sulfate No 2 Ammonium phosphate/potassium chloride bin White prilled particles, pink fragmented particles, and grey encrusted particles AS, ammonium phosphate, and possibly potassium chloride No 3 Space between FGAN and potassium chloride bins Dark pink fragments Ammonium phosphate, sulfate, alkali salts of fluoride, trace iron No 4 Backside of diammonium phosphate bin White powder with red streaks AN, AS, chlorides, ammonium phosphate, and trace amounts of potassium chloride Yes

West Fertilizer Company Final Report January 2016 77 U.S. CHEMICAL SAFETY AND HAZARD INVESTIGATION BOARD

The FGAN/AS mixture purchased by the farmer on the day before the incident was the only available sample representative of materials stored in the fertilizer building before the incident. In addition to the testing conducted by the OTSC to determine the percentage of nitrogen and quantity of fine in these samples, CSB commissioned additional laboratory testing of the prills contained in the FGAN/AS mixture (samples 7 and 8 in Table 4) in October 2015. Because the FGAN sample from the railcar on the WFC property remained relatively undisturbed during the fire and explosion, the laboratory also selected a prill from that sample (no. 6 in Table 4) for comparison. An image from a macroscopic examination of an individual prill from sample items 6, 7, and 8 is shown in Figure 47. Item 6, which was collected from the railcar, had a smooth and uniform coating-like texture, whereas evidence items 7 and 8, which were sampled from the farmer’s mixture, had an uneven surface made up of an agglomeration of amorphous (formless) and semicrystalline particles.

Figure 47. Physical Comparison of Samples (20x) (Source: Forensic Laboratory) 5 Backside of ammonium sulfate bin Sample containing gravel and pebbles (separated before analysis) AS, sulfates, and chlorides No 6 Railcar White prilled particles Prilled AN coated with polyolefin Yes 7 Farmer AS/FGAN mixture White prilled particles (partially agglomerated from wetting) AN, AS, sulfate, extractable polyolefin Yes 8 Farmer AS/FGAN mixture White prilled particles AN, AS, sulfate, extractable polyolefin Yes

West Fertilizer Company Final Report January 2016 78 U.S. CHEMICAL SAFETY AND HAZARD INVESTIGATION BOARD

Under a microscope, the polyolefin coating was visually apparent on the surface of the item 6 prill. Through infrared spectral analysis, the laboratory was able to chemically identify the external prill coating as a polyolefin. However, the external polyolefin coating on the surface of sample items 7 and 8 could not be identified through the same analysis. To determine whether a coating had been present, the laboratory quantitatively extracted residues from the prills in a solvent that could be analyzed through infrared spectra analysis. Although direct surface scans of items 7 and 8 did not reveal the presence of the coating, solvent extracts indicated the presence of a polyolefin. This coating could have been applied to the prills at some point in time but was no longer acting as a prill coating on the observed sample items 7 and 8. 4.5 Blast and Impact Analysis CSB commissioned a consultant firm to survey the property damage to the WFC and the surrounding community. On the basis of information obtained from the survey, the consultants characterized the force of the blast and estimated the energy produced during the explosion. Using indicators from the observed damage to residences and community structures, the consultants applied a guideline100 from the U.S. Army Corps of Engineers and created a three-dimensional model to predict the blast overpressure and determine the explosive weight that was best explained by the physical damage observed in West, Texas. The computational models and calculations expressed the AN explosive energy estimation normalized against the explosive power of TNT,101 a high-explosive compound commonly used to quantify blast loads. A TNT equivalence calculation provides an approximation of explosive energy in pounds of TNT. Several TNT equivalent equations are used in industry that employ actual and estimated explosion parameters such as heat capacity, weight of explosive charge, and explosion percent efficiency. Many of the parameters are specific to the material involved. TNT equivalent values are a rough approximation of explosive effects, and the variability of TNT equivalence (20 to 40 percent) might be a result of the ways that it is calculated based on pressure, impulse, crater size, or other damage measures.102 The blast modeling consultants estimated the range of potential explosive yields from the WFC explosion to be equivalent to a range of 20,000 to 40,000 pounds of TNT, based on the blast damage indicators recorded and analyzed from 20 lightweight metal buildings, the deformed basketball goalposts, and the condition of the apartment complex and nursing home. To further refine a specific explosive weight most consistent with all of the observed damage, the consultants used another modeling tool that incorporates a number of different blast prediction methodologies, including the development of a computational fluid dynamic simulation to characterize the shock wave as it wrapped around structures and other obstacles during the explosion. The CSB-

100 U.S. Army Corps of Engineers. “Estimating Damage to Structures from Terrorist Bombs Field Operations Guide,” ETL 1110-3-495. Washington, DC: U.S. Army Corps of Engineers, 1999. 101 One ton of TNT has an explosive energy of 4.184 gigajoules. 102 National Assessment Group. “Ammonium Nitrate Detonability Review and Assessment, Final Report.” Prepared for the Technical Support Working Groups, For Official Use Only. Kirtland AFB, NM: September 2, 2011: 7.

West Fertilizer Company Final Report January 2016 79 U.S. CHEMICAL SAFETY AND HAZARD INVESTIGATION BOARD commissioned blast experts determined that the explosive energy of the WFC explosion that is most consistent with the observed damage is 25,000 pounds (12.5 tons) of TNT. With an estimated 30 tons of FGAN in the main WFC bin at the time of the blast, the 12.5-ton TNT equivalent is based on a 42 percent efficiency of the material that contributed to the explosive energy. Because the quantity of FGAN consumed in the fire before the explosion was not determined, the exact quantity of FGAN that contributed to the explosion remains unknown. The ATF National Response Team also requested that the U.S. Army Engineer Research and Development Center (ERDC) conduct an assessment of the WFC explosion damage and then estimate the equivalent explosive yield of the blast. The ERDC team arrived in West on April 29, 2013. As part of the site study, the ERDC team conducted a detailed survey of the crater left by the explosion (Figure 48), using survey and three-dimensional scanning equipment to verify critical dimensions. The shape of the crater was asymmetric, with an apparent diameter of 75 feet and a depth of nearly 8 feet (Figure 49). Figure 48. Ground-Level View of WFC Explosion Crater (Source: CSB)

West Fertilizer Company Final Report January 2016 80 U.S. CHEMICAL SAFETY AND HAZARD INVESTIGATION BOARD Figure 49. WFC Explosion Crater Profile Measurements (Source: Army Corps of Engineers) The ERDC team compared the field crater measurements with experimental data for blast craters and other sources to produce an estimate of the net explosive weight of the FGAN. The experimental data also took into consideration the near-surface geology (soil type and underlying rocks) surrounding the explosion, which has an effect on the crater depth and size. The ERDC team compared the crater dimensions and soil types from the WFC explosion with similar experimental data to estimate the explosive weight of FGAN. The final report on this analysis concluded that this method entails a degree of uncertainty because none of the experimental data included the type of soil with limestone found in Texas.103 In addition, the experimental charge was C-4, which might have a different explosive or cratering efficiency than FGAN. The ERDC team made assumptions to account for the lack of available data and, on the basis of the crater analysis, estimated the WFC explosion to be within the range of 10,000 to 21,500 pounds of TNT. The center of the crater was almost directly under the WFC facility’s main FGAN bin, which was likely the source of fuel for the explosion. This main bin contained an estimated 20 to 30 tons of FGAN at the time of the incident; however, the blast analyses from consultants hired by CSB and from the Army Corps of Engineers indicate that the quantity of FGAN that contributed to the explosion could have been smaller, based on the observed damage. To demonstrate the location of the crater in reference to the fertilizer storage building and the main FGAN bin, CSB commissioned a structural engineering firm to create a three-dimensional rendering of the fertilizer facility over the crater location (Figure 50).104 Figure 51 shows an elevation view of the fertilizer building, with the underlying crater. 103 The soil at the WFC consists of limestone with varying amounts of chalk and clay. This soil type is consistent with what would be expected in West, Texas. 104 Crater and building location are estimated to be within +/- 2 feet, based on global positioning information.

West Fertilizer Company Final Report January 2016 81 U.S. CHEMICAL SAFETY AND HAZARD INVESTIGATION BOARD

Figure 50. Overhead View of WFC Bins, with Crater Underlay (Source: Atlas Engineering)

Figure 51. Elevation View of Fertilizer Building, with Crater Depth (Source: Atlas Engineering) 4.5.1 Seismic Data According to the United States Geological Survey (USGS), the WFC explosion registered as an earthquake of magnitude 2.1 on the Richter scale. The Lake Whitney seismic station in Meridian, Texas, about 25 miles west-northwest of the WFC site, recorded seismic signals from the April 17, 2013, explosion. ATF concluded that there were two separate explosions, “one smaller and one larger,” based

West Fertilizer Company Final Report January 2016 82 U.S. CHEMICAL SAFETY AND HAZARD INVESTIGATION BOARD

on eyewitness accounts and seismic evidence.105 After conversations with USGS seismologists, CSB later learned that a system error occurred, and only one event was recorded at the Lake Whitney station. According to USGS, seismic signals resulting from the WFC explosion were recorded on nine seismic stations within a range of 25 to 360 miles. Using the onset time of the seismic energy at these stations and the known location of the explosion, the USGS National Earthquake Information Center estimated that the time of the explosion was 7:50:38 pm local time. According to USGS, the seismic data recording shows both energy that propagated through the earth as well as later-arriving energy that propagated through the air (Figure 52). USGS concluded that the event was a single large explosion, but it could not rule out the possibility of multiple closely timed explosions.

Figure 52. Data Recorded at Lake Whitney Station, WHTX, and Seismograph by the USGS National Earthquake Information Center (Source: USGS) 5.0 Commercial Property and Liability Insurance The West Fertilizer Company (WFC) had commercial property insurance to cover losses (such as building damage, damage to product, or loss of income due to property damage) from certain loss events, such as fires. The company also held a commercial liability insurance policy to protect itself against claims for bodily injury while onsite or while operating company automobiles. CSB examined available documentation of the WFC’s insurance coverage and inspections from 2007 until the April 2013 explosion. The WFC was insured by two different insurance companies, Triangle Insurance Company,

105 ATF. “ATF Press Conference Video,” May 16, 2013, minute 12:45. See: http://www.youtube.com/watch?v=OpLjSvcRqzU (accessed on November 19, 2015).

West Fertilizer Company Final Report January 2016 83 U.S. CHEMICAL SAFETY AND HAZARD INVESTIGATION BOARD

Inc. (Triangle) and the United States Fire Insurance Company (U.S. Fire). Triangle issued policies that included coverage for property damage, business interruption, bodily injury, and automobile accidents from 2007 to the end of 2009. In late 2009, Triangle decided not to renew the insurance policy because of the WFC’s lack of compliance with loss control recommendations. The WFC insurance policy expired on December 31, 2009. Thereafter, the WFC obtained similar coverage from U.S. Fire in January 2010 and renewed it in 2011, 2012, and 2013. The U.S. Fire insurance policy was in effect at the time of the 2013 explosion. 5.1 Triangle Insurance Coverage and Audits (2006–2010) Triangle conducted an initial onsite survey of the WFC facility in 2006 and provided insurance coverage from 2007 until 2010. The WFC had a $1 million commercial general liability policy and $2 million in coverage to cover onsite property and business losses. In 2009, Triangle gave notice to the WFC that it was not renewing the policy because of the WFC’s lack of compliance with loss control recommendations issued by Triangle following several onsite audits. Triangle conducted annual loss control surveys at the WFC facility from 2006 through 2009, and it issued a number of recommendations for suggested improvements to WFC operations. The Triangle loss control surveys included an evaluation of WFC automobiles and drivers, storage and application of dry and liquid fertilizers, grain and feed milling, and anhydrous ammonia. CSB investigators requested and reviewed insurance documentation from Triangle, including risk profiles, insurance audit reports, and communications from Triangle to the WFC. In 2006, Triangle performed an initial survey of the WFC facility before issuing coverage. Triangle loss control specialists made four recommendations to the WFC for safety improvements, including replacing missing guards on augers and conveyors and addressing visual damage to one of the grain bins. Triangle’s overall risk assessment categorized the facility as average, with housekeeping, maintenance, and grounds in average to fair condition. During the anhydrous ammonia survey, Triangle noted the close proximity of the WFC facility to schools, residences, and businesses and also documented concerns about the ammonia risk management plan (RMP) being out of date (discussed in Section 8.4.2.4). Triangle assigned a representative to work with the WFC to update and improve the RMP submission. In 2007, Triangle conducted another loss control survey and submitted 10 recommendations to the WFC; 4 of the 10 recommendations were restated from the 2006 survey because they remained unresolved. The loss control specialist identified several safety and compliance issues, including: • A corroded 440-volt wire ran from the pole on the north side of the plant through the bulk fertilizer facility to the anhydrous ammonia tank area on the south side of the facility. • An aluminum ground wire showed noticeable signs of corrosion from the fertilizer. The loss control specialist noted that the wire could lose its ability to ground, potentially causing shock and fire hazards (Figure 53). • Several temporary lighting sockets needed to be wired in permanently to reduce the potential for electrical shocks and fire hazards.

West Fertilizer Company Final Report January 2016 84 U.S. CHEMICAL SAFETY AND HAZARD INVESTIGATION BOARD

About 2 months later, the WFC responded to some of the Triangle recommendations and reported that 3 of the 10 recommendations were resolved, including replacing guards and repairing an electrical cord on an auger. The remaining seven recommendations, including the exposed 440-volt wire, remained outstanding. The Triangle loss control specialist’s overall opinion of risk, documented from this survey, was fair; housekeeping received a fair rating; and maintenance received a fair to poor rating.

Figure 53. Exposed 440-Volt Electrical Wiring Identified in 2007 Survey (Source: Triangle Insurance Company) In September 2008, a loss control specialist from Triangle conducted another renewal survey and made 14 recommendations, including several outstanding recommendations from the previous year. During this survey, Triangle identified additional damaged electrical wires at the facility in need of repair (Figure 54). The WFC submitted a completed recommendation form to Triangle later that month, stating that seven recommendations were addressed or in the process of being settled.

West Fertilizer Company Final Report January 2016 85 U.S. CHEMICAL SAFETY AND HAZARD INVESTIGATION BOARD

Figure 54. Damaged Electrical Cord Identified in 2008 Insurance Survey (Source: Triangle Insurance Company) In August 2009, Triangle identified six additional recommendations during the annual loss control survey. One recommendation was restated and designated as “critical” for a lack of safety chains on towing equipment. The Triangle consultant also noted that the WFC “seems to be resistant” to implementing a training program to address the frequency of vehicle and mobile equipment accidents. Triangle documented a large quantity of temporary exposed wiring in the WFC facility that needed to be run in conduits. When evaluating WFC safety programs in 2009, Triangle noted that the company had no positive safety culture and that “written programs are incomplete and outdated, there is no structured safety program.” In addition, Triangle found no accident investigation program and no evidence that the WFC held regular safety meetings for employees. The following excerpt from the 2009 survey indicates Triangle concerns: They need a SCMP (Safety and Compliance Management Programs) person to help them with safety issues, permits, etc. To my knowledge they have not had a safety meeting since we started insuring them in 2006…I have a concern with the wiring at both grain operation & the dry fertilizer plant. Only about 10% is run in conduit. The rest consist of a heavy flexible 4-wire cable, the type you would normally use to put outside on poles but it is not protected from cuts & abrasion.106 In September 2009, the loss control specialist stated in an internal Triangle email that “because of losses and non-compliance of recommendations, Triangle should non-renew Adair Grain, Inc./West Fertilizer Co. in West, Texas.”107 In September 2009, Triangle sent notification to the WFC that all policies would not be renewed for the following year. In 2010, the WFC retained U.S. Fire for insurance coverage.

106 Triangle Insurance Company Documentation, Loss Control Survey at Adair Grain/WFC. August 2009. 107 Triangle Representative. “Adair Grain,” email message to manager, Underwriting Services Triangle, September 14, 2009.

West Fertilizer Company Final Report January 2016 86 U.S. CHEMICAL SAFETY AND HAZARD INVESTIGATION BOARD

  1. 1.1 Triangle Loss Control Surveys That Did Not Include FGAN Hazards

CSB reviewed the WFC loss control survey documentation and the Triangle “Loss Control Best Practice Manual” for insurance inspectors and found no focus on FGAN fire and explosion hazards between 2006 and 2009. In the 2006 survey and subsequent surveys, Triangle documented the presence of ammonium nitrate (AN) onsite for security concerns and answered, “Yes” to the question, “Does the account meet state regulations for the storage and transportation of product?” Although no state-specific regulations for AN storage existed at the time, the survey did not include federal regulations, such as the OSHA Explosives and Blasting Agents standard (29 CFR 1910.109, discussed in Section 8.2), or industry consensus standards, such as National Fire Protection Association (NFPA) 400, Hazardous Materials Code (addressed in Section 8.6.1). Triangle guidance included a description of combustible and noncombustible bulk fertilizer storage buildings for informational purposes, but Triangle did not provide guidelines or requirements for specific storage practices, such as separation from potential contaminants, materials of construction, or mechanism for fire and explosion prevention. Other survey focus areas, such as grain milling and anhydrous ammonia, included a more detailed review of federal requirements, such as the OSHA Grain Handling Facilities Standard (29 CFR 1910.272) for the prevention of grain dust explosions and the EPA Risk Management Program rule for anhydrous ammonia storage. In November 2013, Triangle updated the best practice manual to include compliance with federal regulations in addition to state regulations for fertilizer storage and transportation. 5.2 U.S. Fire Insurance Coverage and Audits (2010–2013) U.S. Fire started providing insurance to the WFC in 2010 and renewed coverage for 2011, 2012, and

  1. The WFC was insured by U.S. Fire at the time of the April 2013 incident. The WFC general

liability policy had a maximum limit of $1 million, and the commercial property insurance policy had a limit of about $4.45 million, which included all buildings and equipment on the WFC property. In 2013, the WFC held U.S. Fire coverage for commercial property, general liability, inland marine,108 and commercial automobile. According to the insurance policy documentation for the WFC, U.S. Fire offered policyholders a loss control service that included onsite surveys of the facility to provide: • Safety information and educational material to minimize loss costs. • Initial survey and evaluation. • Specific suggestions for improving loss control practices. • Consultation and training to help management understand hazards associated with operations. • Follow-up surveys.

108 Commercial inland marine insurance covers property in transit or property that is movable or portable and is not at a fixed location.

West Fertilizer Company Final Report January 2016 87 U.S. CHEMICAL SAFETY AND HAZARD INVESTIGATION BOARD

CSB requested additional information from U.S. Fire related to the WFC insurance policy, including claims, audits and inspections, and training requirements for U.S. Fire loss consultants. CSB also requested documentation of U.S. Fire’s onsite inspections at the WFC facility over the time period it was insured. To date, U.S. Fire has not provided CSB with the requested documentation. Outside counsel for U.S. Fire indicated to a CSB investigator that the $1 million policy amount did not necessitate much onsite activity, such as audits or inspections, during the time that the WFC was insured. 109 5.3 Insurance Claims and Other Aid after the Explosion The Texas Department of Insurance (TDI) regulates the business of insurance in Texas and provides resources for people and businesses to obtain insurance in the state. In response to the WFC explosion, TDI assisted in securing the scene and mobilizing a disaster response program to assist consumers with filing insurance claims related to the incident. The Texas State Fire Marshal’s Office (SFMO) and the Division of Workers’ Compensation are units within TDI. The total insurance-related losses due to the explosion are estimated to be in the range of $230 million.110 Many of the residents in the area did not have home or rental insurance. Those individuals relied on aid from FEMA, Salvation Army, and American Red Cross operations. FEMA received a total of 1,108 applications for assistance as a result of the fire and explosion at the WFC facility.111 Nearly 6 months after the incident, FEMA112 reported providing federal disaster assistance exceeding $16 million to eligible survivors. This sum included more than $9 million in federal disaster loans from the U.S. Small Business Administration (SBA), nearly $840,000 in individual assistance grants from FEMA, and more than $6.2 million in FEMA Public Assistance funding.113 Low-interest disaster assistance loans from the SBA114 were also available to homeowners, renters, businesses of all sizes, and private nonprofit organizations whose property was damaged or destroyed by the incident. On the basis of data provided by FEMA, 580 applications were submitted for individuals or families that had homeowners, homeowners with small business loans, and mobile home insurance. FEMA verified losses totaled about $9,052,308. The real property FEMA verified losses amounted to about $8,145,750. The personal property FEMA verified losses totaled roughly $906,557. Although all losses related to the fire and explosion totaled nearly $250 million, the

109 Outside Counsel for U.S. Fire, conversation with CSB Investigator, January 20, 2015. 110 Texas House of Representatives, 84th Texas Legislative Session. Testimony on House Bill 2470. See: http://www.house.state.tx.us/video-audio/committee-broadcasts/ (accessed on January 6, 2016). 111 Official data provided by FEMA. 112 FEMA—under the authority of Section 408 of the Robert T. Stafford Disaster Relief and Emergency Assistance Act, 42 U.S.C. § 5174, and Title 44 of the Code of Federal Regulations (CFR)—may provide financial assistance and, if necessary, direct services to eligible individuals and households that, as a direct result of a major disaster, have necessary expenses and serious needs and are unable to meet such expenses or needs through other means. 113 See: http://www.fema.gov/news-release/2013/10/07/federal-disaster-assistance-tops-16-million-west-texas (accessed on January 6, 2016). 114 The SBA serves as the Federal government’s primary source of money for the long-term rebuilding of disaster- damaged private property. These disaster loans cover uninsured and uncompensated losses and do not duplicate benefits of other agencies or organizations.

West Fertilizer Company Final Report January 2016 88 U.S. CHEMICAL SAFETY AND HAZARD INVESTIGATION BOARD

WFC carried a policy from U.S. Fire at the time of the incident with a limit of only $1 million for bodily injury and offsite property damage. 5.4 FGAN Facilities in Texas and the Potential for Offsite Consequences Under the Texas Commercial Fertilizer Rule (described in Section 8.7.1), facilities that sell or offer to sell FGAN or FGAN-containing materials must obtain annual registrations from the Office of the Texas State Chemist (OTSC) to do business. The OTSC collects information on each facility storing more than 10,000 pounds (5 tons) of AN in Texas. According to the OTSC list of facilities as of September 2014, 80 facilities statewide stored AN in quantities exceeding 10,000 pounds. Of those 80 facilities, 43 stored FGAN, and 37 stored technical grade ammonium nitrate (TGAN). In October 2015, the OTSC reported 40 FGAN facilities in Texas.115 Of those 40 facilities, only nine (23 percent) are located in jurisdictions with an adopted fire code. CSB found that West, Texas, is not the only town in the state with FGAN storage in close proximity to residential areas, schools, and hospitals. In fact, some of these occupancies are directly adjacent to, or across the street from, FGAN storage. Because the WFC operated in close proximity to schools, residences, and a nursing home, CSB plotted the 40 FGAN storage facilities in Google Earth™ to determine whether FGAN storage facilities are also in close proximity to residential areas, schools, or other large population clusters. CSB found that 19 (48 percent) of the facilities storing more than 10,000 pounds of FGAN are located within 0.5 miles of a school, hospital, nursing home, or a combination of those occupancies. Of the 40 FGAN facilities, 33 (83 percent) of the FGAN storage facilities are located within 0.25 miles of a residence or apartment building.116 The WFC facility was about 550 feet (0.16 miles) from the closest school, which sustained catastrophic damage as a result of the explosion, which could have resulted in additional loss of life had the school been in session at the time of the incident. CSB identified one other school in Texas that is 529 feet (0.12 miles) from an FGAN storage facility, even closer than the school destroyed in West, Texas (Figure 55). Of the 40 FGAN storage facilities, 16 (40 percent) are within 0.5 miles of an elementary school, secondary school, or high school (Figure 56).

115 CSB noted that two new FGAN facilities registered with the OTSC between September 2014 and October 2015 and that five facilities were listed in September 2014 that did not register to sell FGAN in October 2015. 116 The closest structures with obvious characteristics of a private residence were selected for this measurement using Google Earth and Google Street View.

West Fertilizer Company Final Report January 2016 89 U.S. CHEMICAL SAFETY AND HAZARD INVESTIGATION BOARD

529 Feet FGAN Facility School

Figure 55. Overhead View of a School Approximately 529 Feet from an FGAN Storage Facility (Source: Google Earth)

Figure 56. Breakdown of FGAN Storage Facilities (10,000 pounds or more) Within 1 Mile of a Texas School (Source: CSB) 0 2 4 6 8 10 12 14 16 18 Less than 0.25 miles (< 0.4 km) 0.25 to 0.50 miles (0.4 to 0.8 km) 0.50 to 1 mile (0.8 to 1.6 km) Greater than 1 mile (> 1.6 km) Number of Texas FGAN Facilities Distance to Schools Fire Code No Fire Code

West Fertilizer Company Final Report January 2016 90 U.S. CHEMICAL SAFETY AND HAZARD INVESTIGATION BOARD

The West Rest Haven nursing home was located about 600 feet from the WFC facility and sustained irreparable damage as a result of the blast. CSB measured distances between Texas FGAN storage facilities and nearby hospitals and nursing homes and found that 38 percent of the facilities are within 1 mile of a nursing home or hospital. In one case, a fertilizer facility is adjacent to a 50-bed hospital and a residence, also a few blocks from a school (Figure 57). Hospital 278 Ft. FGAN Facility Residence 220 Ft. School 1432 Ft.

Figure 57. Overhead View of a Texas FGAN Storage Facility near a Hospital, Residence, and School (Source: Google Earth) Findings from the analysis of the proximity of FGAN storage facilities to various community structures show that the risk to the public from a catastrophic incident exists throughout the state of Texas. Injury data published by the Waco-McLennan County Health Department supported the conclusion that people within 1,500 feet (or 0.28 miles) from the blast epicenter were the majority of those injured in the WFC fire and explosion, particularly those who were inside a structure at the time of the blast.117 5.5 Limits of Insurance Coverage in Texas Property and liability insurance companies can complement government oversight of industry by identifying hazards and reducing losses through the insurance process. In some ways, insurance can

117 Waco-McLennan County Public Health District. “Public Health Report: Injuries Related to the West (Texas) Fertilizer Plant Explosion,” April 2013 (issued on June 24, 2014).

West Fertilizer Company Final Report January 2016 91 U.S. CHEMICAL SAFETY AND HAZARD INVESTIGATION BOARD

augment government standards and safety monitoring.118 The insurance industry provides coverage for losses at established premiums but also has an incentive to reduce and manage risks. Insurers perform functions of risk reduction and risk management by using tools such as auditing and inspecting their clients, managing loss prevention efforts, analyzing loss histories, identifying causes of accidents, and teaching clients how to avoid premium increases (or how to secure premium reductions).119 Insurance reinforces existing government regulations by expecting that policyholders comply with existing requirements. This approach can be effective at reducing risk and preventing incidents because annual insurance audits can be more frequent than state or federal enforcement inspections, such as those by SFMO or OSHA. Texas law does not require facilities that store FGAN to obtain commercial general liability or property insurance; however, the WFC voluntarily obtained insurance. The WFC’s $1 million general liability policy with U.S. Fire did not include excess or umbrella coverage for the consequences of serious incidents, such as bodily injury and property damage. If the WFC is found responsible for this incident in civil cases, its insurance would not be sufficient to pay the full amount of insurance claims for the catastrophic consequences caused by the blast. Texas law requires some businesses to have liability insurance for operations that potentially pose a lower level of public risk than the WFC incident (Table 5). Air conditioning and refrigeration contractors, mold assessors, and plumbers are some of the businesses or services subject to commercial general liability requirements in Texas. For amusement ride owners and operators, Texas set the minimum requirements for insurance at $1.5 million per occurrence and requires proof of insurance to operate an amusement ride. For an amusement park ride to operate in the state, the ride must be inspected at least annually by the insurer.120 The ride also must meet the standards for coverage and have an adequate amount of insurance coverage.121 Operators of amusement park rides annually must file copies of the inspection certificate and insurance policy with the TDI Commissioner. The Texas amusement ride regulation also requires operators of coin-operated rides and bounce houses to obtain liability insurance. However, FGAN storage facilities such as the WFC facility can operate next to schools, residential areas, and hospitals with little or no general liability insurance. Adequate levels of coverage would likely prompt rigorous onsite loss control audits by insurers.

118 Ben-Shahar, Omri, and Kyle D. Logue. “Outsourcing Regulation: How Insurance Reduces Moral Hazard,” Michigan Law Review 111:2 (2012); University of Michigan Law and Economics Research Paper No. 12-004; University of Chicago Institute for Law and Economics Olin Research Paper No. 593. See: http://ssrn.com/abstract=2038105 (accessed on January 6, 2016). 119 Ibid. 120 Texas Occupations Code, § 2151.101, “Regulations of Amusement Rides: Requirements for Operation.” See: http://www.statutes.legis.state.tx.us/Docs/OC/htm/OC.2151.htm (accessed on August 4, 2015). 121 Ibid.

West Fertilizer Company Final Report January 2016 92 U.S. CHEMICAL SAFETY AND HAZARD INVESTIGATION BOARD

Table 5. Minimum Insurance Requirements in Texas122 Business/Operation Minimum Amount Amusement ride operators $1.5 million Elevator/escalator contractors $1.5 million123 Mold assessors and remediators $1 million124 Electricians $600,000125 Residential appliance installers $600,000126 Plumbers $300,000127 Tow truck operators $300,000128 Structural pest control providers $300,000129 Used automotive parts recyclers $250,000130 Air conditioning service providers $200,000131

Previous incidents in Athens, Bryan, and West have demonstrated the risk imposed by FGAN facilities on Texas communities and the public. In the absence of a state fire code, there is limited state oversight to ensure that facilities are addressing conditions that could potentially lead to an incident similar to the WFC fire and explosion.

122 See: http://www.dallasnews.com/news/west-explosion/headlines/20130508-texas-makes-bounce-house-operators- carry-liability-coverage-but-not-plants-like-west-fertilizer.ece (accessed on January 6, 2016). 123 See: https://www.tdlr.texas.gov/elevator/Elevapp.pdf (accessed on January 6, 2016). 124 Texas Administrative Code Licensing Requirements. See: http://txrules.elaws.us/rule/title25_chapter295_sec.295.309 (accessed on January 6, 2016). 125 See: http://www.tdlr.texas.gov/electricians/forms/ElectricianCOI.pdf (accessed on January 6, 2016). 126 See: http://www.tdlr.texas.gov/electricians/forms/ELC012 Residential Appliance Installation Contractor License Application.pdf (accessed on January 6, 2016). 127 See: http://www.tsbpe.state.tx.us/common/CertificateofInsuranceForm-fillablefeb2012.pdf (accessed on January 6, 2016). 128 Administrative Rules of the Texas Department of Licensing and Regulation, § 86.400, “Insurance Requirements— Tow Truck Permits.” 33 TexReg 2940. New section adopted, effective April 15, 2008. 129 Texas Occupations Code, § 1951.312, “Liability Insurance.” See: http://www.statutes.legis.state.tx.us/Docs/OC/htm/OC.1951.htm (accessed on January 6, 2016). 130 See: https://www.tdlr.texas.gov/parts/aprrules.htm#8740 (accessed on January 6, 2016). 131 Proof of insurance is required only with an initial application for licensure, a change in license assignment (new company), or a request by the Department of Insurance.

West Fertilizer Company Final Report January 2016 93 U.S. CHEMICAL SAFETY AND HAZARD INVESTIGATION BOARD

Triangle conducted annual inspections at the WFC facility and identified conditions that could result in potential losses, such as fires and worker injuries. Although Triangle did not focus specifically on hazards related to FGAN storage, it offered recommendations to the WFC to correct conditions, such as electrical hazards, that could result in a fire. CSB did not receive any documentation that U.S. Fire continued performing similar audits and inspections at the WFC facility after Triangle’s nonrenewal. It is not common for states to have prescriptive requirements for insuring specific industries. However, TDI does impose liability insurance and inspection requirements for amusement park rides and establishes minimum liability insurance coverage for certain operations and services, as listed in Table 5. CSB identified other FGAN storage facilities located in close proximity to community structures; however, the level of insurance carried by these facilities remains unknown. In response to the WFC incident, TDI conducted a voluntary survey of 95 Texas fertilizer facilities in June 2013 and requested the names of the companies that insure those facilities against general liability, property, and workers’ compensation losses. TDI received 12 responses to the 95 inquiries. Although the number of responses does not suggest that the remaining fertilizer facilities are uninsured, there is no way to determine whether these facilities have insurance policies that incorporate audits and inspections to focus on safe FGAN storage and handling conditions. On March 5, 2015, House Bill 2470 proposed amendments to the Texas Commercial Fertilizer Rules to require proof of liability insurance coverage for annual registration, similar to the requirements for amusement park rides. The bill proposed to amend the Texas Agriculture Code to require public liability insurance to produce, store, transfer, blend, or sell FGAN or FGAN-containing materials upon applying for a permit under the Texas Commercial Fertilizer Rules.132 However, this bill did not pass the state legislature. Without insurance and inspection requirements for FGAN facilities, operators can sell bulk quantities of fertilizer with little or no insurance coverage. The process of obtaining insurance could encourage both agricultural insurers and insured parties to assess current risks and to increase the awareness and rigor of insurance audits to ensure that companies are safely storing FGAN in accordance with guidance released as part of Executive Order 13650 (addressed in Section 8.1), OSHA standards, and industry consensus standards such as NFPA 400. Minimum coverage requirements will spur more realistic risk analysis by insurers that write coverage for FGAN bulk storage retail facilities. By providing agricultural businesses the guidance to identify and address FGAN hazards when underwriting and conducting annual loss control inspections, insurers can play a role in ensuring that FGAN facilities mitigate hazardous conditions.

132 The required liability insurance policy proposed by HB 2470 afforded bodily injury and property damage protection in an amount determined by TDI to compensate a person who incurred damages as a result of FGAN operations. The bill also directed TDI to coordinate with the Texas State Fire Marshal, Department of Health Services, Office of the Texas State Chemist, and other agencies to study the risk exposure for FGAN activities to determine the appropriate requirements for a liability insurance policy.

West Fertilizer Company Final Report January 2016 94 U.S. CHEMICAL SAFETY AND HAZARD INVESTIGATION BOARD

  1. 6 Insurance Services Office Rating

The Insurance Services Office (ISO)133 is an independent commercial enterprise and insurance industry advisory company that provides information, evaluation, and underwriting on safety and risk management related to community fire protection and building code effectiveness, serving insurance companies and other fire safety organizations. ISO adopts a public protection classification (PPC) system to develop fire insurance premiums for residential and commercial properties.134 ISO obtains information on municipal fire protection efforts in communities throughout the United States. Those data are then analyzed and evaluated for communities, using a standardized method and criteria known as the Fire Suppression Rating Schedule (FSRS). The FSRS assigns a PPC rating (from 1 to 10) to fire departments in each community. Class 1 represents exemplary public protection, and Class 10 indicates that the area’s fire suppression program does not meet ISO minimum criteria. ISO develops a split classification; for example, 5/9. The first class (Class 5 in the example) applies to properties within 5 road miles of a fire station and within 1,000 feet of a fire hydrant. The second class (Class 9 in the example) applies to properties within 5 road miles of a fire station but farther than 1,000 feet from a hydrant. ISO generally assigns Class 10 to properties farther than 5 road miles from a fire station. To determine a community’s PPC, ISO conducts a field survey, with ISO staff members visiting the community to observe and evaluate features of the fire protection systems. Using the FSRS, ISO objectively evaluates three major areas: fire department,135 water supply,136 and fire alarm and communication systems.137 When ISO allocates a high class rating to a fire department, ISO works with the affected fire department and the city to make improvements to the fire department, water system, and/or fire and alarm communication systems. Once these improvements are completed, the city then requests a new ISO reclassification. ISO reevaluates the city and then notifies the fire department of the new PPC rating. If a lower rating is received, the city notifies all homeowners and business owners to inform their insurance carriers to adjust their policies based on the new classification.

133 See: http://www.isomitigation.com/index.php/about-iso (accessed on January 7, 2016). 134 Insurance companies often rely on information from ISO about a community’s fire protection services to evaluate claims and damages. 135 A review of the fire department accounts for 50 percent of the total classification. ISO focuses on a fire department’s first-alarm response and initial attack to minimize potential loss. Here, ISO reviews items such as engine companies, ladder or service companies, distribution of fire stations and fire companies, equipment carried on apparatus, pumping capacity, reserve apparatus, department personnel, and training. 136 A review of the water supply system accounts for 40 percent of the total classification. ISO reviews the water supply that a community uses to determine the adequacy for fire suppression purposes. It also considers hydrant size, type, and installation as well as the inspection frequency and condition of fire hydrants. 137 An ISO review of the fire alarm system accounts for 10 percent of the total classification. The review focuses on the community’s facilities and support for handling and dispatching fire alarms.

West Fertilizer Company Final Report January 2016 95 U.S. CHEMICAL SAFETY AND HAZARD INVESTIGATION BOARD

  1. 6.1 Impact of the City of West Class 5 ISO Rating on the West Fertilizer

Company According to the West Fire Department, ISO rated the city of West at Class 5 before April 17, 2013. The pre-incident ISO classification and PPC rating of the West Volunteer Fire Department (WVFD) placed the city of West among the top 25 percent of all Texas communities (Figure 58). The average classification rating for communities and fire departments in Texas is Class 7.

Figure 58. Distribution of ISO Class Ratings for Cities and Communities in Texas (Source: ISO)138 On the national scale, the average PPC for cities, fire departments, and communities in the United States is Class 7 (the same as the average for Texas). The current ISO rating of the WVFD places the city of West among the top 30 percent of all communities nationwide (Figure 59).

138 See: http://www.isomitigation.com/index.php/ppc-program/how-the-ppc-program-works/facts-and-figures (accessed on December 20, 2015).

West Fertilizer Company Final Report January 2016 96 U.S. CHEMICAL SAFETY AND HAZARD INVESTIGATION BOARD

Figure 59. Distribution of ISO Class Ratings for All U.S. Cities and Communities (Source: ISO)139 Firefighters who responded to the WFC fire reported difficulty in extending their 4-inch fire hoses to the nearest fire hydrant, which was located at West High School, more than 1,500 feet from the burning fertilizer plant. A surviving firefighter testified that the emergency responders had to use one of their fire trucks as a connector line to reach the nearest fire hydrant at the high school. After dropping all of the hose lines on the engine, they discovered that they were about 700 feet short of the length needed to effectively fight the fire. Some of the volunteer firefighters then arranged to take the engine with hose and continue to string lines. One of the firefighters subsequently returned to the hydrant near the high school to attempt to establish a connection from the hose line to the fire hydrant. The explosion occurred just as the firefighter arrived at the fire hydrant, and he survived the explosion, although with severe injuries. The WFC plant was not incorporated into the West city limits,140 so an ISO assessment of the city of West did not capture the fertilizer plant as a high-risk facility. An ISO evaluation of the WFC plant would have increased the city’s ISO rating and would have compelled the insured residents141 and industrial facilities to carry higher homeowners and industrial hazard insurance premiums.142 The WFC

139 Ibid. 140 Section 9 discusses land use planning and zoning. 141 If the WFC plant had been included in the ISO rating, the city of West would have had a higher classification score, with an increased insurance premium for homeowners in West because of the proximity of the fertilizer plant to residential neighborhoods. 142 The rating directly impacts the premiums that insurance companies charge for commercial and industrial facilities as well as homeowner’s coverage. A lower ISO rating means a lower price for insurance coverage.

West Fertilizer Company Final Report January 2016 97 U.S. CHEMICAL SAFETY AND HAZARD INVESTIGATION BOARD

had insurance coverage of $1 million, without any prior evaluation from ISO. If ISO had evaluated the fertilizer plant, insurance underwriters would have charged a higher premium for the WFC plant based on the level of risks and hazards associated with the chemicals and operations at the WFC facility. Also, the ISO rating system would have revealed the distance from the nearest fire hydrant to the fertilizer plant, which would have increased the PPC rating. To obtain lower ISO PPC ratings, the city of West would have had to make adjustments by installing and regularly maintaining fire hydrants with ISO-minimum water flow rates closer to the fertilizer plant to enable ease of reach during emergencies.143 6.0 Inherently Safer Technology FGAN has certain risk characteristics that can make it inherently dangerous under some conditions. Ammonium nitrate (AN) by itself is a powerful oxidizer; when mixed with fuel oil, it can be used as an industrial explosive when exposed to fire or shock. Traditional safety practices to control FGAN fire and explosion hazards through procedures, hazard awareness, and emergency response are important. However, applying the concept of inherently safer technology (IST) or inherently safer design (ISD) can substantially reduce risk. IST and ISD are recognized approaches for decreasing risk by permanently reducing or eliminating the hazards associated with materials and operations used in an industrial process.144 Trevor Kletz, an acknowledged expert on IST and chemical process safety, defined IST as the avoidance of hazards rather than the control of hazards by adding protective equipment.145 Inherently safer processes can be achieved by strategies such as: • Substituting dangerous chemicals or processes with safer alternatives. • Simplifying processes. • Minimizing the quantity of a chemical on hand or in a process. • Moderating the operating conditions of a process. Before the widespread adoption of IST, plant designs in the chemical industry tended to address reduction of risk by relying on layers of protective equipment, procedures, and alarms.146 IST is preferable to adding layers of protection because, while this approach might reduce the likelihood or impact of an event, the inherent hazards remain.147 The concept of IST can be derived from a list of strategies for

143 To qualify for rating credit, fire hydrants must be capable of delivering a minimum of 500 gpm for 30 minutes. 144 Center for Chemical Process Safety. Inherently Safer Chemical Processes—A Life Cycle Approach, Second Edition. New York: John Wiley & Sons, 2009. 145 Kletz, Trevor A., and Paul Amyotte. Process Plants: A Handbook for Inherently Safer Design. Boca Raton, FL: CRC Press, 2009. 146 Kletz, Trevor, and Paul Amyotte. Process Plants: A Handbook for Inherently Safer Design, Second Edition. Boca Raton, FL: Taylor & Francis, 2010. 147 Ibid.

West Fertilizer Company Final Report January 2016 98 U.S. CHEMICAL SAFETY AND HAZARD INVESTIGATION BOARD

reducing risk (Figure 60). IST is most effective when implemented during the earliest stages of the process design, but it can be applied at all stages of a life cycle (design, operation, shutdown, and demolition).148

Figure 60. Risk Control Hierarchy (Source: CCPS)149 Table 6 lists some IST approaches that can be applied to FGAN. Table 6. Inherently Safer Approaches for Handling FGAN150 Inherently Safer Strategy Description Examples Substitution Replacing a hazardous material with a safer option Use a fertilizer with less explosive potential than FGAN Minimization Reducing the quantity of a hazardous material used in a chemical process Store FGAN in purpose-built buildings holding smaller quantities of materials, well separated from one another and from potential sources of contamination Moderation Using a hazardous material under the least hazardous conditions Store FGAN in bins constructed of materials impervious to the effects of AN and in areas where electric service is not required Limitation of effects (a form of moderation) Changing designs or reaction conditions rather than adding protective equipment Construct FGAN storage bins to minimize the consequence of a possible explosion Simplification Eliminating process complexity to provide fewer opportunities for error and equipment failure Limit the types of FGAN blends sold to minimize the need for staff to handle FGAN.

148 National Research Council. The Use and Storage of Methyl Isocyanate (MIC) at Bayer CropScience. Washington, DC: The National Academies Press, 2012. 149 Center for Chemical Process Safety. Inherently Safer Chemical Processes—A Life Cycle Approach, Second Edition. New York: John Wiley & Sons, 2009: 3, 27. 150 Ibid.

West Fertilizer Company Final Report January 2016 99 U.S. CHEMICAL SAFETY AND HAZARD INVESTIGATION BOARD

Once all hazards associated with a chemical process are identified and understood, IST can be applied in the design phase or to existing processes. According to Kletz, the concepts of IST are not sharply defined and can merge into each other, depending on how they are applied.151 Although not always feasible or cost-effective, substitution is often the most desired approach for reducing hazards because it involves replacing a hazardous material with a safer alternative. Minimization to reduce the quantity of a hazardous chemical stored or used within a process can often have a dramatic effect on risk, albeit usually only locally. The concept of moderation usually involves processing or storing chemicals under conditions that are less likely to add to or exacerbate risk—such as lower temperatures and pressures, removal of potential catalysts and sources of ignition, or use of materials of construction that minimize heat exposure near FGAN. In addition, the concept of simplification involves modifying procedures to reduce the likelihood of operator error and designing processes that require little or no operator actions to render the process safe in the event of a loss of control. The implementation of one or more of the inherently safer options, if feasible, can eliminate or minimize hazards instead of controlling them. IST might not eliminate all risks associated with a process, and some apparently inherently safer options might introduce new hazards that are of greater concern than those eliminated. For example, a reduced quantity of a hazardous chemical at a plant can lead to greater risk in transportation systems or at the originating plant. Elimination of large FGAN inventories at facilities similar to the West Fertilizer Company (WFC) is impractical because farmers rely on large quantities of fertilizer for their crops. Lower inventories could potentially introduce new hazards from the larger number of FGAN shipments needed to supply storage facilities. Accordingly, before implementation, IST options must be thoroughly analyzed and assessed, considering all risks and not only the interests of an individual facility. In terms of reducing the fire and explosion hazards associated with storage and handling of FGAN, two inherently safe measures are described in the rest of this section: (1) modify or substitute for the formulation of FGAN, making it less susceptible to fire or explosion, and (2) modify the conditions in which FGAN is stored to eliminate the possibility of a large fire and explosion. 6.1 Alternative Formulations of FGAN An alternative formulation of FGAN could reduce the potential for a detonation under fire conditions. However, more testing is necessary to ensure that these formulations are safer in bulk quantities, agriculturally compatible, and environmentally acceptable. In response to the 1947 FGAN explosion in Texas City, Texas, and to subsequent AN-based bombings across the United States,152 researchers have

151 Ibid. 152 Past AN-based bombings in the United States include the 1970 University of Wisconsin bombing, the 1990 Internal Revenue Service building bombing and other attempted bombings in California, the 1995 Murrah Federal Building bombing in Oklahoma City, and the 1996 attempted bombing of the FBI fingerprint database complex in Clarksburg, West Virginia.

West Fertilizer Company Final Report January 2016 100 U.S. CHEMICAL SAFETY AND HAZARD INVESTIGATION BOARD

explored several options for inerting or desensitizing FGAN to lower the detonation sensitivity of the material. One method introduced in 1968 claimed to render FGAN inert with the addition of 5 to 10 percent monoammonium phosphate and diammonium phosphate.153 However, in 1995, a test showed that the mixture was detonable with a larger charge diameter than the initially presented charge.154 In 1997, the International Fertilizer Development Center conducted a study for ATF to study the feasibility, practicability, and impact of making nitrate-based fertilizer chemicals inert. The study concluded that it is not feasible to inert AN without adversely affecting its effectiveness and efficiency as a fertilizer.155 In 1998, the National Research Council (NRC) released a report that addressed existing studies for inerting AN. The NRC examination concluded that FGAN with altered prill porosity, dilutants, or chemical additives could still be detonable156 and that no current technology would reduce the risk without seriously affecting the utility of AN as a fertilizer.157 The NRC recommends further examinations of the impacts of alternate formulations on agricultural suitability, costs to the end-user and environmental impacts of additives or inertants.158 Large quantities of inert materials mixed with AN might not be practical because of the cost and the reduction in fertilizer effectiveness. Adding a percentage of another chemical to AN can make it safer, but farmers might need to buy and transport more fertilizer to deliver the same quantity of nitrogen to their crops.159 CSB has reviewed documentation and publications that describe a few of those alternatives to AN based on the addition of inert chemicals (Table 7). Table 7. Examples of AN Fertilizer Alternatives Name Method Claims

153 Porter, S.J. “Method of desensitizing fertilizer grade FGAN and the product contained,” U.S. Patent 3,366,468, 1968. 154 National Research Council. Containing the Threat from Illegal Bombings: An Integrated National Strategy for Marking, Tagging, Rendering Inert, and Licensing Explosives and Their Precursors. Washington, DC: National Research Council, 1998: 106. See: http://www.nap.edu/openbook.php?record_id=5966&page=106 (accessed on June 26, 2014). 155 See: https://www.atf.gov/file/57516/download (accessed on January 20, 2016). 156 National Research Council. Containing the Threat from Illegal Bombings: An Integrated National Strategy for Marking, Tagging, Rendering Inert, and Licensing Explosives and Their Precursors. Washington, DC: National Research Council, 1998: 106. See: http://www.nap.edu/openbook.php?record_id=5966&page=106 (accessed on June 26, 2014). 157 Ibid. 158 Ibid. 159 Thompson, Steve. Dallas News. Quoting Bob Best, Pentagon scientist: “There are safer alternatives to FGAN fertilizer. But a safer form?” See: http://watchdogblog.dallasnews.com/2013/10/there-are-safer-alternatives-to- ammonium-nitrate-fertilizer-but-a-safer-form.html/ (accessed on June 26, 2014).

West Fertilizer Company Final Report January 2016 101 U.S. CHEMICAL SAFETY AND HAZARD INVESTIGATION BOARD

Sulf-N® 26160 (ASN 26) FGAN fused with ammonium sulfate161 The addition of ammonium sulfate dampens the role of FGAN combustion.162 Ferti-Safe163 Fly-ash-coated and gypsum- coated fertilizer Detonation potential can be reduced or eliminated. Calcium ammonium nitrate (CAN) Mixture of FGAN and limestone (calcium carbonate) or dolomite (calcium magnesium carbonate) Some tests revealed less oxidizing capability than FGAN. CAN is less prone to thermal decomposition than FGAN.

Honeywell has developed a fertilizer called Sulf-N 26 (later marketed by J.R. Simplot Company as ASN 26), claimed to be inherently safer than FGAN. Sulf-N 26 is made of nitrogen and sulfur164 by fusing FGAN with ammonium sulfate (AS), a fire retardant. For the patent, tests were conducted according to United Nations Recommendations on the Transport of Dangerous Goods.165 The test method is designed to measure the potential for a solid substance to increase the burning rate or burning intensity of a combustible substance when the two are thoroughly mixed. The mixture of FGAN fused with AS did not burn in the test, and the mixture was not classified as an oxidizer. Sulf-N 26 contains significantly less nitrogen than FGAN (26 percent compared to 34 percent).166 This nitrogen level can be an issue for some farmers as the effective absorption rate of nitrogen is vitally important to plants. Sulf-N 26 also contains higher quantities of sulfur, which farmers can need for certain types of crops and soils but not for others. Further examination is necessary to fully assess the use of Sulf-N 26 as an inherently safer alternative to FGAN. Notably, a 50/50 mixture of AS and FGAN was involved in the 1921 Oppau, Germany, explosion. Researchers from the University of Kentucky developed a technology called Ferti-Safe to desensitize FGAN by coating it with an ash-like coal combustion by-product.167 They developed the technology with the intention of preventing the malicious use of FGAN for explosive devices. The Ferti-Safe formulation

160 Sulf-N 26 was not commercially available at the time of the WFC incident. 161 Honeywell. “Honeywell Sulf-N 26.” See: http://sulfn26.com/ (accessed on June 26, 2014). 162 Ibid. 163 Ferti-Safe was not commercially available at the time of the WFC incident. 164 Honeywell. “Honeywell Sulf-N 26.” See: http://sulfn26.com/ (accessed on June 26, 2014). 165 United Nations. Recommendations on the Transport of Dangerous Goods, Manual of Tests and Criteria, ST/SG/AC.10/11/Rev2, Section 34, Classification Procedures, Test Methods and Criteria Relating To Oxidizing Substances of Division 5.1, Test O.1: Test for Oxidizing Solids, 1995. 166 Bomgardener, Melody M. “Safer Fertilizer,” Chemical and Engineering News, December 6 (2011). See: http://cen.acs.org/articles/89/web/2011/12/Safer-Fertilizer.html (accessed on May-June 2015). 167 Taulbee, D. et al. Reducing the Explosion Potential of Ammonium Nitrate Fertilizer, Final Report to the National Institute of Hometown Security, Lexington, KY (2012).

West Fertilizer Company Final Report January 2016 102 U.S. CHEMICAL SAFETY AND HAZARD INVESTIGATION BOARD

involves coating FGAN with gypsum (calcium sulfate) and fly ash.168 Both coating options are claimed to be effective in stopping an explosion of a blend of ammonium nitrate/fuel oil (ANFO).169 Calcium ammonium nitrate (CAN) contains 26 percent nitrogen and about 25 percent inert calcium carbonate. Formulations of CAN have been used in Europe and other countries since the 1920s, but it is not manufactured in the United States. European safety data sheets state that CAN is not capable of self- sustaining progressive thermal decomposition.170 The scope of most existing studies on alternative forms of FGAN is focused on reducing or eliminating the security threats associated with using FGAN to construct improvised explosive devices with the addition of fuel oil, but such studies do not focus on FGAN used in agricultural operations. Although some of the available information on these options suggests that they might be inherently safer, only limited testing has been performed to characterize the behavior of the alternatives in fire situations similar to that at the WFC. FGAN is vital to the nourishment of crops across the country, and alternative formulations must also be capable of meeting agricultural fertilizer needs. Because of the lack of scientific literature to show that alternative formulations of bulk FGAN can resist detonation in fires, CSB concludes that FGAN detonations can currently best be avoided through better compliance with storage practices and the application of inherently safe building design and storage. 6.2 Inherently Safe Building Design and Storage In the United States, FGAN storage practices at facilities similar to the WFC have not significantly changed over time. Before the fires in Bryan, Athens, and West, these Texas FGAN facilities had similar construction, with combustible materials and construction and limited fire safety features. CSB visited another EDC facility in Itasca, Texas, in 2013 and also noted combustible construction for the storage facility and bins. Findings from the WFC incident demonstrate that inherently safer concepts can be applied to storage practices to significantly reduce the risk of a fire or explosion. Modifying existing facilities or constructing new storage facilities with inherently safe options—such as facility set-back distances and the use of noncombustible construction materials—can reduce such risks. Because FGAN behavior is unpredictable in fire conditions, the most immediately effective strategy for reducing risk in existing and future FGAN storage facilities is to use inherently safer building design options to avoid creating the hazardous conditions that can contribute to a large uncontrollable FGAN fire and detonation. CSB concluded that the storage of combustible materials near FGAN storage piles and the use of combustible bins likely facilitated the spread of the FGAN-related fire to other bins and nearby

168 Fly ash is a fine particle residue of coal combustion. 169 Taulbee, D. et al. Reducing the Explosion Potential of Ammonium Nitrate Fertilizer, Final Report to the National Institute of Hometown Security, Lexington, KY (2012). 170 See: http://www.eurochem.ru/wp-content/uploads/2012/08/SDB_27_KASweiss_0124_EU.pdf (accessed on January 7, 2016).

West Fertilizer Company Final Report January 2016 103 U.S. CHEMICAL SAFETY AND HAZARD INVESTIGATION BOARD

combustibles. The combustibles also likely acted as a fuel during the fire; the soot, creosote, and other contaminants from the burning wood materials mixed with the surface of the FGAN, potentially increasing its energy and sensitivity to detonation. By eliminating wood and other combustibles as construction materials for FGAN bins and storage facilities and also for the storage of nearby combustible materials, the possibility of contaminating FGAN during a fire or smoldering event is greatly reduced. However, organic materials (such as packing materials or seeds) that are commonly present with the storage of bulk fertilizer will increase the likelihood of an explosion and will make the FGAN explosion more energetic. Certain inorganic contaminants, including chlorides and some metals (such as aluminum powder, chromium, copper alloys, cobalt, and nickel), can also sensitize FGAN, increasing the likelihood of detonation.171 Current OSHA requirements in the Explosives and Blasting Agents standard in 29 CFR 1910.109(i) do not prohibit the use of wooden FGAN storage bins; instead, OSHA requires bins that are protected against FGAN impregnation (as noted in Section 8.2). The installation and use of concrete or metal172 storage bins would reduce the potential for a fire to spread throughout the facility and to other piles of FGAN or nearby combustible materials. It is also inherently safer to store FGAN in places where sources of ignition are not present. For example, a storage building without electric service eliminates the one of the possible sources of ignition and is thus inherently safer. In July 2009, an FGAN-related fire at the EDC fertilizer storage facility in Bryan, Texas, burned the facility to the ground, but the FGAN did not explode. The fire forced an evacuation of more than 80,000 residents in the Bryan area and students at the Texas A&M College Station campus. EDC rebuilt the facility, originally a wooden structure, with concrete bins surrounded by a concrete dome (Figure 61). EDC’s insurance company required the use of concrete construction materials instead of wood to minimize the fire risk.

171 EPA. “EPA Chemical Advisory: Safe Storage, Handling, and Management of Solid Ammonium Nitrate Prills.” See: http://www2.epa.gov/sites/production/files/2015-06/documents/an_advisory_6-5-15.pdf (accessed on November 30, 2015). 172 Galvanized iron, copper or copper alloys, lead, and zinc are not recommended metals for AN storage.

West Fertilizer Company Final Report January 2016 104 U.S. CHEMICAL SAFETY AND HAZARD INVESTIGATION BOARD

Figure 61. Reconstructed EDC Facility in Bryan, Texas (Source: CSB)

Use of concrete bins or external metal hoppers instead of wooden structures is considered an inherently safer option for FGAN storage. According to Kletz, the IST concept of moderation entails storing or transporting a hazardous material in a less hazardous manner.173 In this case, eliminating the presence of the combustibles removes an obvious and principal source of fuel and heat that contribute to detonation. Replacing bins with structures made of concrete instead of combustible materials also limits the quantity of FGAN available to support combustion by confining it to the bin and preventing the acceleration of a fire. It is well recognized that wood is not a preferred material of construction for buildings or bins storing FGAN, and untreated wooden bins should never be used to store FGAN because of the oxidizing properties of FGAN that will increase the burning temperature and rate of burn of the structure itself, facilitating the spread of a fire. Concrete or compatible metals should be used to avoid contamination during fires. The Health and Safety Executive in the United Kingdom states that FGAN storage “should be constructed of a material that does not burn, preferably concrete.”174 In March 2014, CSB responded to OSHA’s request for information (RFI) (at 78 Federal Register 73756) on future possible revisions to OSHA safety standards, including the Explosives and Blasting Agents standard in 29 CFR 1910.109(i) and the Process Safety Management standard in 29 CFR 1910.119. In response to the RFI, CSB urged OSHA to consider revising existing standards to provide more explicit requirements for the storage and handling of FGAN, including prohibiting wooden or combustible FGAN storage bins. 175 In May 2015, the NFPA issued a new edition of NFPA 400-2016, Hazardous Materials Code (Chapter 11, “Ammonium Nitrate”), which prohibits combustible construction materials for new FGAN storage facilities and establishes requirements for automated fire detection, fire suppression, alarm activation, and evacuation plans for existing facilities with combustible construction. CSB recommends that OSHA revise its standards to include requirements similar to those in NFPA 400-2016 for FGAN storage facilities to reduce the likelihood of a detonation when FGAN is exposed to fire. 7.0 Emergency Response The FGAN explosion at the West Fertilizer Company (WFC) facility killed 15 people and caused more than 260 injuries. Of the 15 fatalities, 12 were first responders (firefighters and emergency services) personnel who responded to the fire—eight volunteer firefighters, with five from the West Volunteer Fire Department (WVFD), two from the City of Abbott Fire Department, and one from the Mertens and

173 Kletz, Trevor, and Paul Amyotte. “Attenuation.” Process Plants: A Handbook for Inherently Safer Design, Second Edition. Boca Raton, FL: CRC Press, 2010: 103. 174 Health and Safety Executive (HSE). Storing and Handling Ammonium Nitrate. United Kingdom: Health and Safety Executive, 2004. See: http://www.hse.gov.uk/pubns/indg230.pdf (accessed on January 6, 2016). 175 CSB. “CSB Comments on the OSHA Proposed Rule: Process Safety Management and Prevention of Major Chemical Accidents.” See: http://www.regulations.gov/#!documentDetail;D=OSHA-2013-0020-0074 (accessed on November 30, 2015).

West Fertilizer Company Final Report January 2016 105 U.S. CHEMICAL SAFETY AND HAZARD INVESTIGATION BOARD

Navarro Mills Fire Department; an off-duty career firefighter (captain) from the City of Dallas Fire Department; an emergency medical technician (EMT) from West; and two good Samaritans who supported the emergency response at the fertilizer plant.176 One of the deceased volunteer firefighters who responded to the fire was also an employee of the WFC. CSB developed this section of our report to provide information to fire departments across the country by evaluating the key factors that contributed to the firefighter fatalities and to share lessons learned so that similar events can be avoided in the future. Accordingly, to determine what went wrong, CSB used emergency response documents, interviews, and video footage to analyze in detail the actions that were taken before and during the approximately 20 minutes that elapsed from the first call for assistance until the explosion occurred. This analysis is not focused only on volunteer firefighters; it demonstrates the need for effective pre- incident planning and firefighter training. Firefighters are expected to make risk assessments and decisions under time pressure with limited visibility during an actual response to a fire, which is almost impossible without adequate training. Although this analysis indicates that the emergency responders involved in this incident accepted an extremely high level of risk that resulted in multiple deaths, CSB recognizes that they were attempting to develop a plan of action for a fire scenario that none of them had prior practical experience with. 7.1 Firefighter Response The chain of events—from the time the volunteer firefighters and other emergency responders arrived at WFC until the time of the explosion—can never be precisely known. On the basis of interviews with surviving firefighters and the evaluation of the incident scene, CSB was able to assess the emergency response process on April 17, 2013. On the evening of the incident, the emergency responders who were initially dispatched to the fire arrived at the scene at different times. CSB obtained a street surveillance camera video recording and also camera footage from the inside of a neighboring hardware store in West.177 The surveillance recording indicated that four emergency response vehicles were en route between 7:37 pm and 7:51 pm, when the explosion occurred, as shown in the timeline of events in Figure 62.

176 One of these Good Samaritans was familiar with the equipment used by the WVFD and volunteered to assist the second, who was in the area tending to cattle and offered his help to the firefighters. These two deceased Good Samaritans were made honorary volunteer firefighters at the memorial for the fallen West, Texas, firefighters and other emergency responders held in Waco, Texas, on April 25, 2013. 177 The convenience store and street surveillance camera are located about a mile from the WFC facility at the intersection between East Pine Street and North Roberts Street.

West Fertilizer Company Final Report January 2016 106 U.S. CHEMICAL SAFETY AND HAZARD INVESTIGATION BOARD

Figure 62. Timeline of Events for Emergency Response to WFC Facility (Source: CSB)

Emergency responders were notified and dispatched to the scene at about 7:29 pm on April 17. The firefighters arrived on scene over a span of about 14 minutes, as recorded on surveillance footage of emergency vehicles en route to the WFC site that night.178 In the video footage, the WVFD fire chief can be observed driving the water tender toward the incident scene at about 7:41 pm. Firefighters were dispatched to the scene of the emergency without anyone’s knowledge of how long the fire had been

178 Because the WVFD is a volunteer-based service, it should be noted that the volunteer firefighters were not at the station at the time of the incident. Several firefighters were at home, attending to other personal activities or participating in an EMT training class.

West Fertilizer Company Final Report January 2016 107 U.S. CHEMICAL SAFETY AND HAZARD INVESTIGATION BOARD

burning or smoldering before being noticed.179 Upon arrival, they concentrated their efforts initially on the incident scene, preparing to suppress flames that were visible at the northeast portion of the storage structure. Without a robust incident pre-planning process in place, without adequate hazardous materials awareness training, and with no previous FGAN-related fire emergency training or drills, the firefighters had no expectation of a possible FGAN explosion. The firefighters were advised by the career fire captain that they did not have the resources to combat the growing fire and should concentrate on cooling the liquid anhydrous ammonia tanks located near the burning building to prevent the tank from rupturing or venting. However, they had not established that stream of water when the explosion occurred because they had to shut off the attack lines while the pumpers were repositioned.180 7.2 Key Contributing Factors to Emergency Responders’ Fatality CSB identified the following seven key factors that contributed to the fatalities of firefighters and other emergency responders in West:

  1. Lack of incident command system.
  2. Lack of established incident management system.
  3. Lack of hazardous materials (HAZMAT) and dangerous goods training.
  4. Lack of knowledge and understanding of the detonation hazards of FGAN.
  5. Lack of situational awareness and risk assessment knowledge on the scene of an FGAN-related

fire.

  1. Lack of pre-incident planning at the WFC facility.
  2. Limited and conflicting technical guidance on AN.
  3. 2.1 Lack of Incident Command System

CSB found that none of the responding emergency response personnel trained and certified in the National Incident Management System (NIMS) process formally assumed the position of Incident Commander (IC) who would have been responsible for conducting and coordinating an incident command system (ICS). Senior emergency response personnel at the WVFD arrived at the scene of the WFC incident at different times and did not delegate an IC to be in charge of the incident. Also, there was no record that arriving firefighters conducted an initial incident size-up or risk assessment to determine initial actions (offensive or defensive) that would be most suitable in responding to the incident based on the situation and available resources without putting emergency personnel at risk. Despite multiple responders having ICS training, none of them reportedly established command or took control of the fire ground. On the basis of a review of radio communications and interviews with surviving firefighters, CSB found no clear messaging or discussion among the responding firefighters on who should assume the role of the designated IC. Without a delegated IC officially taking control of the

179 CSB was unable to determine how long the fire had been burning before the firefighters were notified. 180 NIOSH Fire Fighter Fatality Investigation and Prevention Program. See: http://www.cdc.gov/niosh/fire/ (accessed on December 28, 2015).

West Fertilizer Company Final Report January 2016 108 U.S. CHEMICAL SAFETY AND HAZARD INVESTIGATION BOARD

fire ground operations, no ICS was established. Consequently, no senior emergency response personnel or IC was responsible for coordinating the various response activities carried out by individual firefighters on the scene. The West fire chief arrived on scene at about 7:41 pm and did not critically assess the conditions on the ground before the explosion 10 minutes later, at about 7:51 pm. The fire chief and assistant chief provided support and advisory functions but did not actively engage in fire ground function or take control of the fire ground; no record indicated that the West fire chief took command of the incident upon his arrival.181 Without direction to the contrary, the firefighters immediately took offensive action against the flames coming from the doors on north end of the east side of the structure. CSB interviews with surviving firefighters indicated that before the arrival of the fire chief, the other senior firefighters who had reached the incident scene about six minutes earlier had not delegated senior personnel with the training and expertise needed to formally assume responsibility as the IC. The firefighters had not reached a conclusion about how to establish a best approach and how to respond to the fire when the explosion occurred. Despite being trained for the ICS and NIMS process, none of the certified firefighters had prior practical experience in establishing incident command or coordinating and maintaining control of any previous emergency that merited the same approach as an FGAN-related fire scene. 7.2.2 Lack of Established Incident Management System CSB found that the emergency response personnel who responded to the WFC incident did not take time to set up, implement, and coordinate an effective incident management system plan that would have ensured evacuation of the nearby residents. Because no formal IC was in charge of the incident, none of the firefighters took responsibility for formally establishing and coordinating an effective incident management system. Witness testimonies revealed that emergency alert systems for the public were not activated before the explosion, although McLennan County had such systems in place.182 Many of the injuries might have been avoided or might have been less severe if an immediate evacuation had occurred. When the fire was first detected by a police officer, he ordered people in the parks near the facility to evacuate, and he blocked off roads. In addition, employees from the nursing home took the initiative as part of their company emergency response policy to move occupants to the back of the building for fear of smoke or an ammonia release. However, without a formal evacuation order to the entire affected community, many of the residents were left unaware of the risk and chose to watch the fire from inside their homes or vehicles or from the street, placing them within range of the high-pressure blast wave and in the line of flight of debris. In a study conducted after the WFC incident of FGAN-related fires worldwide since

181 NIMS requires that the ICS should be established by the first arriving NIMS qualified personnel. Best practices indicate that the fire chief does not need to be on the scene of a fire before the ICS can be established. 182 See Section 8.5 of this report.

West Fertilizer Company Final Report January 2016 109 U.S. CHEMICAL SAFETY AND HAZARD INVESTIGATION BOARD

1970, the majority of detonations occurred within 60 minutes of the initial fire report.183 Because this elapsed time to detonation might be shorter than the response times for emergency operations and potential firefighting, a ‘let-it-burn’ approach with a precautionary evacuation of the surrounding neighborhood is appropriate.184 An incident management system is intended to provide a standard approach to management of emergency incidents. The U.S. Department of Homeland Security (DHS) established NIMS in 2004.185 NFPA 1561 (2014 Edition) indicates, “[T]he incident management system shall provide structure and coordination to the management of emergency incident operations to provide for the safety and health of emergency services organization responders and other persons involved in those activities.”186 DHS developed the NIMS program to standardize the incident management process by facilitating coordination of an emergency among all responders (including all levels of government and public, private, and nongovernmental organizations) so that they work together seamlessly and manage incidents involving threats and hazards (regardless of cause, size, location, or complexity) to reduce loss of life, property damage, and harm to the environment. To achieve this objective, FEMA, an organization within DHS, developed a NIMS training program.187 All federal emergency responders, including firefighters, are required to receive NIMS training.188 Presidential Policy Directive 5, which established the NIMS training program, applies to all federal agencies, and non-federal entities, although not required to participate, are encouraged to do so.189 NFPA 1500 (Standard on Fire Department Occupational Safety and Health Program, 2013 Edition190) and NFPA 1561 (Standard on Emergency Services Incident Management System and Command Safety, 2014 Edition191) emphasize the need to use effective incident management systems at all emergency

183 Marlair, G., et al. Comments about the paper entitled “Lessons to be Learned from an analysis of ammonium nitrate disasters in the last 100 years,” by Pittman et al., Journal of Hazardous Materials 280 (2014). 184 Ibid. 185 See: https://www.fema.gov/national-incident-management-system (accessed on December 28, 2015). 186 NFPA. NFPA 1561: Standard on Emergency Services Incident Management System and Command Safety, 2014 Edition. Quincy, MA: NFPA, 2014. 187 The NIMS training program specifies National Integration Center and stakeholder responsibilities and activities for developing, maintaining, and sustaining NIMS training. The NIMS training program outlines responsibilities and activities that are consistent with the National Training Program, as mandated by the Post-Katrina Emergency Management Reform Act of 2006. This program integrates with FEMA training offered through the Emergency Management Institute (EMI) and USFA. See: http://www.fema.gov/pdf/emergency/nims/nims_training_program.pdf (accessed on December 28, 2015). 188 See: https://www.fema.gov/national-incident-management-system/training (accessed on December 28, 2015). 189 To compel non-Federal entities seeking grants, FEMA does require its grant recipients to verify that they are “NIMS-compliant.” However, there is no requirement for fire services not receiving federal grants to participate in NIMS. See: https://www.fema.gov/pdf/emergency/nims/nims_training_program.pdf (accessed on December 28, 2015). 190 NFPA. NFPA 1500: Fire Department Occupational Safety and Health Program, 2013 Edition. Quincy, MA: NFPA, 2013. 191 NFPA. NFPA 1561: Standard on Emergency Services Incident Management System and Command Safety, 2014 Edition. Quincy, MA: NFPA, 2014.

West Fertilizer Company Final Report January 2016 110 U.S. CHEMICAL SAFETY AND HAZARD INVESTIGATION BOARD

scenes. In most cases, this process is known as the ICS, with the primary objective of managing the incident. NFPA 1561 defines an incident management system as “a system that defines the roles and responsibilities to be assumed by responders and the standard operating procedures to be used in the management and direction of emergency incidents and other functions.” CSB concluded that despite multiple personnel in the WVFD being trained and certified to initiate and manage the NIMS process, none of the certified firefighters who responded to incident was designated to assume or assumed the role of IC to initiate and coordinate the ICS and incident management plan as stipulated in the NIMS process. If the West firefighters had executed a planned, tested, and practiced ICS and incident management plan, the number of injuries and casualties sustained by both responders and neighboring residents could have been reduced. 7.2.3 Firefighter Training Firefighters must cope with extraordinary situations and circumstances that threaten their personal safety. To improve execution and reduce the threat of injury or loss of life, it is vital for both volunteer and career firefighters to receive thorough training and information supporting effective decision making. CSB’s investigation of the WFC incident revealed that no standardized training requirement applies to volunteer firefighters across the nation.192 The NFPA has found that, in general, career firefighters have more funding from their local municipalities and thus are often better trained and better equipped compared to volunteer or hybrid fire departments across the country.193 In some communities, volunteer firefighters receive training in formal or informal settings; however, this training hinges on the state and regulatory authority, and the level and type of this basic and specialty training are not standardized. Some VFDs provide training programs equal to those of paid departments, but most volunteer firefighters either pay out of pocket or raise funds to pay for any additional specialty training. Such specialty training can address wildland firefighting, technical rescue, swift water rescue, HAZMAT response, vehicle extrication, and firefighter assist and search teams. CSB found that since there is no federal agency regulating municipal fire departments, some volunteer firefighters in less populated areas or rural communities rarely receive any major type of course training, and most of their initial training is usually on-the-job experience.194 In addition, some volunteer

192 Career firefighters have a standardized basic minimum training requirement. 193 In its report A Third Needs Assessment of the U.S. Fire Service, the NFPA found that compared to their big city counterparts, fire departments in smaller communities were more likely to report that many firefighters had not had formal training in various activities and did not have sufficient PPE. See: http://www.nfpa.org/~/media/files/research/nfpa-reports/fire-service-statistics/2011needsassessment.pdf?la=en (accessed on December 28, 2015). 194 Many volunteer firefighters near special or large manufacturing and storage facilities do receive training from the facility staff. This observation is particularly true when the volunteers include employees of the facility.

West Fertilizer Company Final Report January 2016 111 U.S. CHEMICAL SAFETY AND HAZARD INVESTIGATION BOARD

firefighters receive EMT195 and fire academy training.196 After completing the EMT and fire academy training, most firefighters are required to earn state certification. To maintain additional professional competency, some volunteer firefighters become state certified, but they must meet the same levels of requirements as those that apply to career firefighters. For example, in Texas, the general requirements for volunteer fire protection personnel certification programs are the same as those for paid personnel. Certification for paid fire protection personnel in Texas is mandatory, but for volunteer fire protection personnel, participation in a certification program is voluntary and not enforced.197 Texas does not require volunteer firefighters to receive a minimum level of training on how to respond to fires involving hazardous materials. In some cases, volunteer firefighters receive first-level certification, which gives an overview of fire suppression and rescue techniques, including HAZMAT and jaws-of-life training. NFPA 1001 (Standard for Fire Fighter Professional Qualifications, 2013 Edition198) provides recommended basic and minimum training requirements that all firefighters are expected to complete to respond to fire emergency calls. Once the basic training requirement has been met, the subsequent level of training differs between paid career and volunteer firefighters. In Texas, paid career firefighters are required to complete about 500 hours of training certification over four levels—introduction, basic, immediate, and advanced—through an academy-type program. Training and certification for volunteer firefighters are provided through the State Firefighters’ and Fire Marshals’ Association of Texas (SFFMA).199 The SFFMA sets up standards for training and certification, but local jurisdictions are left to decide how many firefighters should be sent for particular training and the level of certification needed to protect their respective localities. For example, VFDs in rural areas and sparsely populated communities might require their firefighters to be certified only at the introductory level because few

195 Some firefighters are mandated to receive certification as an EMT. The general EMT-Basic training requires about 100 hours of classroom or field instruction, usually involving some hours of practice in a hospital or ambulance. At the end of the training, EMT-Basic students must take and pass an examination. Firefighters seeking additional training may enroll in the EMT-Intermediate class or the Advanced EMT class, which includes an additional 1,000 hours of education in advanced medical emergency response and care. See: http://work.chron.com/certifications- need-become-firefighter-17338.html (accessed on December 28, 2015). 196 The fire academy training program prepares firefighters for state firefighter certification. The fire academy program involves the completion of classes in the fire science program. Other courses administered in the fire academy program for entry-level firefighters address building codes, emergency medical procedures, and prevention techniques. In addition, the programs train students to fight fires with standard equipment, such as fire extinguishers, ladders, axes, and chainsaws. See: http://work.chron.com/certifications-need-become-firefighter- 17338.html (accessed on December 28, 2015). 197 See: http://www.tcfp.texas.gov/certification/certification_overview.asp (accessed on December 28, 2015). 198 NFPA. NFPA 1001: Standard for Fire Fighter Professional Qualifications, 2013 Edition. Quincy, MA: NFPA, 2013. 199 According to its website, the SFFMA was established in 1876 to support fire and emergency service providers in Texas and beyond. The SFFMA offers support to more than 1,200 fire departments, 22,000 individual members, 80 industrial fire brigades, and EMS and international departments. See: http://www.sffma.org/web/SFFMA/About_Us/SFFMA/About.aspx?hkey=84e079d0-75c2-47df-b9e9- 7ae03d5685dd (accessed on December 28, 2015).

West Fertilizer Company Final Report January 2016 112 U.S. CHEMICAL SAFETY AND HAZARD INVESTIGATION BOARD

buildings are in the area. In contrast, other towns or communities (such as West) that are near a chemical plant might require their firefighters to receive HAZMAT training and certification. 7.2.4 Firefighter FGAN Knowledge and Lack of HAZMAT Training CSB determined that lack of knowledge and understanding of FGAN detonation hazards at the WFC facility contributed to the emergency responder fatalities. Interviews with surviving firefighters indicated that they did not have sufficient time and information to properly assess the WFC facility and evaluate the behavior of the FGAN-related fire. Because the firefighters did not have adequate knowledge of the FGAN hazard, they focused their emergency response efforts on the anhydrous ammonia tanks. The lack of adequate HAZMAT training and the lack of FGAN firefighting guidance contributed to the deaths of the emergency responders. A joint NFPA-USFA survey revealed that an estimated 36 percent of U.S. fire departments involved in HAZMAT responses have not provided formal training in those duties to all involved personnel.200 CSB reviewed the training and experience of the firefighters who were fatality injured in the WFC incident and found that all of the responding firefighters had minimum training and certifications for responding to fire emergencies, especially training through FEMA courses.201 In addition, very few of the volunteer firefighters involved in this explosion, including surviving officers, had received HAZMAT training. Only two of the deceased volunteer firefighters had taken the HAZMAT awareness course, which is the introductory basic level for HAZMAT training and includes recognition and use of the Emergency Response Guidebook (ERG) as well as notification protocols.202 Table 8 shows the age, rank, function at the scene, and training and experience levels of the victims. Table 8. Training and Experience Information of the Fatally Injured Firefighters203 Victim Rank Age Years of Experience Training Function on Scene 1 Firefighter 48 15 years with WVFD Landing zone safety, propane emergency response, fire and emergency management services emergency response, HAZMAT awareness, ladder practices, hose handling, live burns, basic self-contained breathing apparatus (SCBA), Introduction to Incident Dispatched to incident site by WVFD

200 NFPA, USFA. “Four Years Later: A Second Needs Assessment of the U.S. Fire Service.” See: www.usfa.fema.gov/downloads/pdf/publications/fa-303-508.pdf (accessed on December 28, 2015). 201 See: https://training.fema.gov/is/crslist.aspx?all=true (accessed on December 28, 2015). 202 NIOSH. “9 Volunteer Fire Fighters and 1 Off-Duty Career Fire Captain Killed by an Ammonium Nitrate Explosion at a Fertilizer Plant Fire–Texas.” NIOSH Report on Death in the Line of Duty. Report Number F2013-

  1. See: http://www.cdc.gov/niosh/fire/pdfs/face201311.pdf (accessed on December 28, 2015).

203 Ibid.

West Fertilizer Company Final Report January 2016 113 U.S. CHEMICAL SAFETY AND HAZARD INVESTIGATION BOARD

Victim Rank Age Years of Experience Training Function on Scene Command System (ICS-100),204 ICS for Single Resources and Initial Action Incidents (ICS-200),205 National Incident Management System (NIMS): An Introduction (IS-700),206 National Response Framework: An Introduction (IS-800b)207 2 Career Fire Captain (off duty) 52 31 years with career fire department 31 years as a career firefighter from Dallas (Training status unknown) Responded voluntarily to assist WVFD 3 Firefighter 26 2 years at mutual aid VFD ICS-100, ICS-200, IS-700a, NIMS Multiagency Coordination System (MACS) Course (IS-701a),208 NIMS Public Information Systems (IS-702a),209 NIMS Resource Management (IS- 703a)210 Dispatched for mutual aid 4 Firefighter 37 17 years at mutual aid VFDs211 Emergency vehicle operations, basic auto extrication, compressed air foam systems,212 basic firefighting, ICS-100, ICS-200, IS-700a, IS-800.b, HAZMAT I & II,213 Various training classes offered by TEEX and other departments since 1996.214 Responded in privately owned vehicle (POV); dispatched for mutual aid 5 Volunteer Captain 29 10 years at mutual aid VFD Training status unknown Attending EMT class nearby. Dispatched for mutual aid; responded in POV

204 See: https://training.fema.gov/is/courseoverview.aspx?code=IS-100.b (accessed on December 28, 2015). 205 See: https://training.fema.gov/is/courseoverview.aspx?code=IS-200.b (accessed on December 28, 2015). 206 See: https://training.fema.gov/is/courseoverview.aspx?code=IS-700.a (accessed on December 28, 2015). 207 See: https://training.fema.gov/is/courseoverview.aspx?code=IS-800.b (accessed on December 28, 2015). 208 See: https://training.fema.gov/is/courseoverview.aspx?code=IS-701.a (accessed on December 28, 2015). 209 See: https://training.fema.gov/is/courseoverview.aspx?code=IS-702.a (accessed on December 28, 2015). 210 See: https://training.fema.gov/is/courseoverview.aspx?code=IS-703.a (accessed on December 28, 2015). 211 Training information provided to the CSB by victim’s family. 212 Ibid. 213 Ibid. 214 Ibid.

West Fertilizer Company Final Report January 2016 114 U.S. CHEMICAL SAFETY AND HAZARD INVESTIGATION BOARD

Victim Rank Age Years of Experience Training Function on Scene 6 EMT, Firefighter 33 1 year at mutual aid VFD Training status unknown Attending EMT class nearby. Rode in city ambulance 7 On E-1 Firefighter 41 2 years with WVFD Basic auto extrication, emergency driving, landing zone safety, ICS-100, IS-700a Responded on Engine 1 8 Firefighter 50 13 years with city VFD Fire and EMS emergency vehicle response, landing zone safety, ground cover (basic and intermediate), EMS emergency vehicle response, vehicle extrication, propane ER, fire and EMS ER, Intro to IC, HAZMAT awareness, fire emergency vehicle response, ladder practices, hose handling, live burns, basic SCBA, ICS-100, ICS-700a, IS-800b Drove the brush truck 9 Volunteer Captain 50 18 years with WVFD Basic firefighting, propane emergency response, ICS-100, IS-700a Responded in POV 10

Firefighter 29 3 years with WVFD Firefighting phase 1, emergency driving, basic auto extrication, landing zone safety, SCBA and smokehouse training, ICS-100, ICS-200b, Intermediate ICS for Expanding Incidents (ICS-300),215 Advanced ICS (ICS-400),216 IS-700a, IS- 701a, IS-702a, IS-703a, NIMS Communication and Information Management (IS-704), NIMS Intrastate Mutual Aid: An Introduction (IS-706),217 IS-800b Drove in Engine 1 Texas provides voluntary certification for HAZMAT technicians and HAZMAT ICs through the Texas Commission on Fire Protection (TCFP).218 The TCFP was established under Texas Government Code, Chapter 419, to develop and enforce recognized professional standards for individuals and the fire service.219 In addition, the TCFP provides education and assistance to the fire service and enforces

215 Intermediate ICS for Expanding Incidents (ICS-300) provides training and resources for personnel who require advanced knowledge and application of the ICS. This course expands on information covered in the ICS-100 and ICS-200 courses. See: http://training.fema.gov/emiweb/is/icsresource/trainingmaterials.htm (accessed on December 28, 2015). 216 The Advanced ICS (ICS-400) course provides training and resources for personnel who require advanced application of ICS. This course expands on information covered in ICS-100 through ICS-300. See: http://training.fema.gov/emiweb/is/icsresource/trainingmaterials.htm (accessed on December 28, 2015). 217 See: https://training.fema.gov/is/courseoverview.aspx?code=IS-706 (accessed on December 28, 2015). 218 See: http://www.tcfp.texas.gov/certification/certification_requirements.asp (accessed on December 28, 2015). 219 See: http://www.statutes.legis.state.tx.us/Docs/GV/htm/GV.419.htm (accessed on December 28, 2015).

West Fertilizer Company Final Report January 2016 115 U.S. CHEMICAL SAFETY AND HAZARD INVESTIGATION BOARD

statewide fire service standards. The TCFP is responsible for certification, training approval, and testing and compliance.220 CSB evaluated the curriculum manual used for HAZMAT certification for firefighters in Texas and found that FGAN explosion hazards were not covered at all. In fact, the manual mentioned FGAN twice under United Nations (UN)/DOT hazard classes and divisions of hazardous materials and weapons of mass destruction (WMD)—as a Class 1, Division 1.5 insensitive explosive221 and as a Class 5, Division 5.1 oxidizing substance222—in the 349-page document.223 Nationally, CSB found that the curriculum used for HAZMAT training does not fully address the hazards and severity of FGAN-related fires and explosions. A review of the U.S. Fire Administration (USFA) National Fire Academy HAZMAT field course outlines confirmed that they place little emphasis on emergency response to storage sites containing dangerous reactive chemicals and oxidizers such as FGAN. Conversely, HAZMAT shipping and transportation are covered in detail in the courses. A review of one firefighter training reference manual, Fundamentals of Firefighter Skills, compiled by the International Association of Fire Chiefs (IAFC) and the NFPA, indicated that very little guidance is provided to firefighters regarding responses to HAZMAT incidents involving reactive chemicals. Chapter 29 (“Hazardous Materials: Recognizing and Identifying the Hazards”) of the second edition of the Fundamentals of Firefighter Skills reference manual includes in-depth information on various HAZMAT transportation methods and containers but does not consider storage and warehousing for these materials. FGAN is not mentioned in the entire chapter.224 CSB concludes that the current training resources at the local, state, and federal levels do not provide sufficient information for firefighters to understand the hazards of FGAN. It is therefore essential for firefighter and emergency response training institutions to collaborate with fire departments to develop and implement a realistic process for ensuring that hazard response knowledge, once attained, does not become unused and obsolete.225

220 TCFP. See: http://www.tcfp.texas.gov/about/mission_and_goals.asp (accessed on December 28, 2015). 221 AN is mentioned as FGAN fertilizer and fuel oil mixtures (ANFO), an example of a very insensitive explosive with a mass explosion hazard (blasting agent) under Division 1.5 (Explosives). Chapter 6, “Hazardous Materials Awareness.” United Nations/Department of Transportation (UN/DOT) Hazard Class and Division of Hazardous Materials and Weapons of Mass Destruction (WMD), Class 1. Section 601: 3. See: http://www.tcfp.texas.gov/manuals/curriculum_manual/chapter_6.pdf (accessed on December 28, 2015). 222 AN is mentioned as an example of a Division 5.1 oxidizing substance under U.N./DOT Hazard Class 5. Chapter 6, “Hazardous Materials Awareness,” Section 601: 4. See: http://www.tcfp.texas.gov/manuals/curriculum_manual/chapter_6.pdf (accessed on December 28, 2015). 223 TCFP. Chapter Six, “Hazardous Materials.” Certification Curriculum Manual, effective on June 1, 2010. Based on NFPA 472 (2008 Edition). See: http://www.tcfp.texas.gov/manuals/curriculum_manual/chapter_6.pdf (accessed on December 28, 2015). 224 NFPA, IAFC. Fundamentals of Fire Fighter Skills, 2nd Edition. Burlington, MA: Jones & Bartlett Publishers, 2008. 225 Hazard response knowledge must be retained, and an effective retraining process must be put in place to prevent the loss of its organizational value.

West Fertilizer Company Final Report January 2016 116 U.S. CHEMICAL SAFETY AND HAZARD INVESTIGATION BOARD

  1. 2.5 Lack of Situational Awareness and Risk Assessment Knowledge

Although many firefighter training courses provide overviews of initial fire scene size-up, assessment, incident planning, and execution, CSB found that none of the firefighter HAZMAT field training courses provide sufficient information on firefighter situational awareness and risk assessment that could help them make informed decisions while at the fire scene.226,227 The firefighters who initially responded to WFC did not have the tools to effectively perform the situational awareness and risk assessment that would have enabled them to make an informed decision to not fight the fire. Situational awareness in firefighting involves the capability to “read” the scene of a fire or emergency, including changes in the behavior of a fire. Effective situational awareness supports prompt decision making to either evacuate the scene of a fire or continue fighting the fire by taking a defensive or offensive stance. Chapter 4 of NFPA 472 (Standard for Competence of Responders to Hazardous Materials/Weapons of Mass Destruction Incidents, 2013 Edition) provides guidance on situational awareness competencies for responder-level personnel.228 In fires involving HAZMAT, it is not always possible for firefighters to obtain needed information before acting, but they might be able to characterize a HAZMAT incident based on initial information acquired from the emergency call center and dispatcher; emergency response manuals and guides; knowledge base on the response area; and visual, auditory, and olfactory (odorous) clues. In some cases, the fire department’s standard operating procedures (SOPs) and the level of training of the emergency response crew might be insufficient to respond at the incident scene to changing events and scenarios that were not planned for or anticipated—hence, the need for effective training on situational awareness and risk assessment. Clearly written SOPs would afford fire department trainees the opportunity to read and understand the operational procedures of their fire department. The NIOSH Alert, “Preventing Injuries and Deaths of Fire Fighters,” emphasizes the need for departments to establish and adhere to the firefighting policies and procedures stipulated in the SOPs.229 NFPA 1500 (Fire Department Occupational Safety and Health Program, 2013 Edition230) emphasizes the need for development of a risk management plan, including risk identification of actual and potential hazards. In addition, it states that “fire departments shall prepare and maintain policies and standard operating procedures that document the organizational structure, membership, roles and responsibilities, expected functions, and training requirements.” NFPA 1500 also

226 NFPA, IAFC. Fundamentals of Fire Fighter Skills, 2nd Edition. Burlington, MA: Jones & Bartlett Publishers, 2008. 227 Texas Commission on Fire Protection. Chapter Six, “Hazardous Materials.” Certification Curriculum Manual, effective on June 1, 2010. Based on NFPA 472 (2008 Edition). See: http://www.tcfp.texas.gov/manuals/curriculum_manual/chapter_6.pdf (accessed on December 28, 2015). 228 NFPA. NFPA 472: Standard for Competence of Responders to Hazardous Materials/Weapons of Mass Destruction Incidents, 2013 Edition. Quincy, MA: NFPA, 2013. 229 See: http://www.cdc.gov/niosh/docs/2005-132/pdfs/2005-132.pdf (accessed on December 28, 2015). 230 NFPA. NFPA 1500: Fire Department Occupational Safety and Health Program, 2013 Edition. Quincy, MA: NFPA, 2013.

West Fertilizer Company Final Report January 2016 117 U.S. CHEMICAL SAFETY AND HAZARD INVESTIGATION BOARD

provides guidance on the procedures to initiate and manage operations at the scene of an emergency incident. Moreover, NFPA 1561 (Standard on Emergency Services Incident Management System and Command Safety, 2014 Edition) states that “SOPs shall include the requirements for implementation of the incident management system and shall describe the options available for application according to the needs of each particular situation.”231 Firefighting environments are inherently unpredictable, volatile, and fraught with risk.232 It is therefore important for decisions to be made in a context of changing priorities, uncertain information, and limited resources. Firefighters must be able to rapidly size up233 any situation and create scenarios (or what-ifs) to make quick and informed decisions and predict the nature and behavior of a fire. NFPA 472 (Standard for Competence of Responders to Hazardous Materials/Weapons of Mass Destruction Incidents, 2013 Edition) offers guidance on competencies for ICs. Scene size-up is essential in any emergency situation, especially for HAZMAT incidents.234 This approach includes a thorough overall assessment of the scene and the identification of all possible hazards to ensure the safety of the emergency response crew. CSB concluded that training references and guides on emergency response do not address how to effectively respond to AN-related fires. 7.2.6 Lack of Pre-Incident Planning at Facility The fire department did not have a formal pre-incident planning program for FGAN at WFC. Firefighters responding to the incident were aware of the risks associated with anhydrous ammonia leaking from the tanks and that it could form a toxic flammable cloud that could leave the facility, drift into nearby homes, and potentially explode. Although some responding firefighters knew that FGAN was onsite, they did not anticipate a possible FGAN explosion. Some of the West fire department officials reported that they were aware of the chemicals routinely stored at the WFC, but there was never any formal training to prepare for a fire or chemical emergency. Effective site-specific pre-incident planning for emergency responders is essential to guide initial and subsequent actions while responders are at an emergency. Onsite pre- incident planning might have identified the possible FGAN explosion hazard. CSB did not find evidence of regularly scheduled training exercises to ensure that the WVFD conducted incident pre-planning and facility tours to address fire safety and chemicals onsite. A pre-incident plan must provide clear information on the magnitude of hazards in a chemical plant or business. A competent incident commander (IC) or designated authority must be capable of executing the pre-incident plan, including analyzing the incident, planning the response, implementing the planned

231 NFPA. NFPA 1561: Standard on Emergency Services Incident Management System and Command Safety, 2014 Edition. Quincy, MA: NFPA, 2014. 232 Flin, R. Sitting in the Hot Seat: Leaders and Teams for Critical Incident Management. Chichester: Wiley, 1996. 233 Incident size-up uses ongoing processes of information gathering and analysis that will help the firefighters make quick and informed decisions concerning how better to respond to the incident. 234 NFPA. NFPA 472: Standard for Competence of Responders to Hazardous Materials/Weapons of Mass Destruction Incidents, 2013 Edition. Quincy, MA: NFPA, 2013.

West Fertilizer Company Final Report January 2016 118 U.S. CHEMICAL SAFETY AND HAZARD INVESTIGATION BOARD

response, evaluating progress, retreating from the incident, and terminating the response. The NFPA 235 provides guidance on developing an effective incident response plan methodology for emergency responders.236 NFPA 472 (Standard for Competence of Responders to Hazardous Materials/Weapons of Mass Destruction Incidents, 2013 Edition237) provides guidance on the competencies required for hazardous materials responders (including the IC) involved in pre-incident planning and execution of the plan. The pre-incident plan also must be effectively communicated to other external emergency units in the surrounding areas for times when these agencies are called on for mutual aid. In addition, a pre-incident plan must be systemic and must include a realistic exit and evacuation strategy, especially when a decision is made to not take offensive action at a hazardous materials incident. Pre-incident planning must include all of the HAZMAT onsite. Plans must be put in place to address how to effectively respond to an emergency. NFPA 1620 (Standard for Pre-Incident Planning, 2015 Edition) states that the pre-incident plan “shall identify and document any special hazards recognized by the authority having jurisdiction that present extraordinary life safety challenges, operations challenges, or other challenges to emergency responders.”238 NFPA 1620 further states that the “pre-incident plan should be the foundation for decision making during an emergency situation and provides important data that will assist the IC in developing appropriate strategies and tactics for managing the incident.” This standard also states that the “primary purpose of a pre-incident plan is to help responding personnel effectively manage emergencies with available resources.” Pre-incident planning involves evaluating the protection systems, building construction, building contents, and operating procedures that can affect emergency operations. NFPA 1620 outlines the steps involved in developing, maintaining, and using a pre-incident plan by isolating the incident into pre-incident, incident, and post-incident phases. In the pre-incident phase, for example, the guidance covers factors such as physical elements and site or occupant considerations, protection systems, water supplies, hydrant locations, and special hazard considerations. Building characteristics—including type of construction, materials used, occupancy, fuel load, roof and floor design, and unusual or distinguishing characteristics—should be recorded, shared with other departments that provide mutual aid, and entered into the dispatcher’s computer if possible so that the information is readily available if an incident is reported at the noted address.

235 The NFPA, a nonprofit standards organization, has been developing standards since 1896 that directly affect fire services at the department level. The NFPA produces more than 300 consensus codes and standards intended to minimize the possibility and effects of fire and other risks. The codes are voluntary standards that industry can adopt and that regulatory agencies can enforce once the codes are signed into law. Standards are an attempt by an industry or profession to self-regulate by establishing minimal operating, performance, or safety criteria. See: http://www.nfpa.org/about-nfpa (accessed on December 28, 2015). 236 CSB referred to the most current edition of the NFPA codes and standards throughout this report. 237 NFPA. NFPA 472: Standard for Competence of Responders to Hazardous Materials/Weapons of Mass Destruction Incidents, 2013 Edition. Quincy, MA: NFPA, 2013. 238 NFPA. NFPA 1620: Standard for Pre-Incident Planning, 2015 Edition. Quincy, MA: NFPA, 2015.

West Fertilizer Company Final Report January 2016 119 U.S. CHEMICAL SAFETY AND HAZARD INVESTIGATION BOARD

An adequate pre-incident plan must include, at a minimum, specific tested and practiced procedures for responding to an emergency at a given facility; a list of potential HAZMAT such as FGAN, including the quantity of each chemical that may be onsite; details on HAZMAT handling and storage; chemical locations at a particular site; the likely behavior of chemicals in a fire, flood, or other emergency; worst case scenario regarding how these chemicals might behave or interact in an emergency; the Safety Data Sheet (SDS)239 for each of the HAZMAT; and specific recommendations on how to respond to a fire when these chemicals are involved. Before the incident, the WVFD did not conduct a pre-inspection for an FGAN-related fire emergency. In most cases, a site-specific pre-incident plan would be developed in partnership with each chemical plant or chemical business in the response jurisdiction. Although WFC reported the quantity and location of each of its hazardous chemicals, including FGAN, to the WVFD, no mechanism ensured that pre-incident drills or inspections were conducted. Although the firefighters in West conducted some onsite anhydrous ammonia drills, none of the drills or training focused on the potential of an FGAN-related fire emergency. A fire pre-plan would enable firefighters to determine various situations where conditions could dramatically change in a burning structure. This information would enable them to consider the hazards associated with each site. Also, the pre-incident plan could provide this advanced information, which might have aided the WVFD in developing a response strategy or might have facilitated a decision to stand down and allow the structure to burn to the ground if no lives were endangered by doing so. Whether a volunteer fire department (VFD) has pre-incident plans in place often depends on the individual fire department. Currently, no federal agency regulates municipal fire departments in the United States. Although the U.S. Congress funded the National Institute for Occupational Safety and Health (NIOSH) in 1998 to establish the Fire Fighter Fatality Investigation and Prevention Program, NIOSH only investigates on-the-job firefighter fatalities and makes recommendations for improvements to the profession. NIOSH lacks authority to enforce regulations or mandate firefighter training requirements.240 7.3 Limited and Conflicting Technical Guidance on FGAN Firefighters might not have at their fingertips all of the hazard information regarding the chemicals that can be found in their communities. Regardless of the instant availability of information on the hazards of a specific chemical, firefighters are required to respond immediately upon dispatch and are expected to

239 An SDS is a document developed by the manufacturer of a hazardous chemical product that communicates the hazards of the product. It is required under OSHA’s Hazard Communication Standard. Under this standard, all chemical manufacturers, distributors, or importers must provide to downstream users an SDS for each hazardous chemical. Previously, SDSs were known as Material Safety Data Sheets (MSDS); however, in 2012, the name underwent a change when OSHA decided to modify the Hazard Communication Standard to adopt the U.N. Globally Harmonized System. 240 NIOSH Fire Fighter Fatality Investigation and Prevention Program. See: http://www.cdc.gov/niosh/fire/ (accessed on December 28, 2015).

West Fertilizer Company Final Report January 2016 120 U.S. CHEMICAL SAFETY AND HAZARD INVESTIGATION BOARD

make prompt decisions. To make effective decisions in fire emergencies, some fire prevention and emergency response stakeholders have developed technical manuals and guidebooks. These guidebooks help emergency responders and firefighters to better understand chemical hazards. References include the Emergency Response Guidebook (ERG), SDSs, and NFPA standards.241 Although firefighting manuals support the prevention of injuries and fatalities, CSB found conflicting information and inconsistencies in various emergency response guidelines. 7.3.1 Emergency Response Guidebook The ERG is a readily available and widely used guidebook among the emergency response community. Formerly known as the DOT ERG, this document is now jointly produced by DOT, Transport Canada, and the Secretariat of Communications and Transportation (Mexico). The current ERG is designed as a resource for first responders to consult during the initial phase of a dangerous goods or HAZMAT transportation incident. Emergency response personnel (such as firefighters, EMTs, and police officers) in the United States, Canada, Mexico, and other countries use the ERG when responding to transportation emergencies involving HAZMAT. In most cases, firefighters who complete HAZMAT courses, the most basic of which is Awareness Level training, are expected to be familiar with the ERG. Figure 63 shows the 2012 edition of the ERG.

241 Annex E of NFPA 400 (2013 Edition) also provides AN firefighting guidance. NFPA. NFPA 400: Hazardous Materials Code, 2013 Edition. Quincy, MA: NFPA, 2013.

West Fertilizer Company Final Report January 2016 121 U.S. CHEMICAL SAFETY AND HAZARD INVESTIGATION BOARD

Figure 63. Cover Page of 2012 Edition of ERG (Source: DOT PHMSA)242 Most firefighting apparatuses have a copy of the ERG.243 After the WFC incident, NIOSH investigators found copies of the 2012 ERG in the glove boxes of some of the damaged fire equipment and apparatuses.244 However, CSB does not have any evidence that indicates whether the West firefighters consulted the ERG on the night of the explosion. The ERG is especially useful in situations when the relevant SDS is not readily available to firefighters. The ERG gives direction (based on DOT Hazard Classification Criteria) on response to HAZMAT and dangerous goods emergencies during transportation. It does not provide any specific guidance on the

242 DOT Pipeline and Hazardous Materials Safety Administration (PHMSA). See: http://phmsa.dot.gov/pv_obj_cache/pv_obj_id_7410989F4294AE44A2EBF6A80ADB640BCA8E4200/filename/ER G2012.pdf (accessed on December 28, 2015). 243 DOT. The Emergency Response Guidebook: A Guidebook for First Responders During the Initial Phase of a Dangerous Goods/Hazardous Materials Transportation Incident (ERG), 2012 Edition. See: http://phmsa.dot.gov/staticfiles//PHMSA/DownloadableFiles/Files/Hazmat/ERG2012.pdf (accessed on December 28, 2015). 244 NIOSH. “9 Volunteer Fire Fighters and 1 Off-Duty Career Fire Captain Killed by an Ammonium Nitrate Explosion at a Fertilizer Plant Fire–Texas.” NIOSH Report on Death in the Line of Duty. Report Number F2013-

  1. See: http://www.cdc.gov/niosh/fire/pdfs/face201311.pdf (accessed on December 28, 2015).

West Fertilizer Company Final Report January 2016 122 U.S. CHEMICAL SAFETY AND HAZARD INVESTIGATION BOARD

handling of ammonium fertilizer.245 In fact, the ERG includes the following commentary under the heading of its 2012 Edition: This guidebook will assist responders in making initial decisions upon arriving at the scene of a dangerous goods incident. It should not be considered as a substitute for emergency response training, knowledge or sound judgment. ERG2012 does not address all possible circumstances that may be associated with a dangerous goods incident. It is primarily designed for use at a dangerous goods incident occurring on a highway or railroad. Be mindful that there may be limited value in its application at fixed facility locations.246 The current edition of the ERG lists 15 variations of FGAN. Next to each FGAN variant is a guide number that leads to information on the potential hazard and the appropriate emergency response, but the suggested measures are broad and subject to varying interpretations. On October 1, 2014, CSB provided comments on a DOT request for information (RFI), “Hazardous Materials: Revision of Emergency Response Guidebook” (FR Doc. 2014-20683), which was published on August 29, 2014.247 CSB commented as follows: The ERG is intended for incidents involving the transport of hazardous materials and is limited to the size of the transportation containers involved.248 However, the CSB has found in several investigations249 that the ERG manual was used by emergency responders for incidents involving chemical fires, explosions and releases of hazardous materials at fixed facilities. Incidents at fixed facilities may involve larger quantities of hazardous materials as well as additional hazards involving process conditions or other hazardous chemicals stored nearby, resulting in higher risk to emergency responders. The directions regarding response to a chemical release or fire incident intended for transportation may be different when applied to an incident at a fixed chemical or manufacturing facility. For this reason, the CSB suggests that the DOT consider additional language to clarify ERG’s use limitations at fixed facilities. CSB also urged DOT to highlight in bold text on the front cover page of the next edition of the ERG: “Only Intended for Use When Responding to Transportation Incidents.” Realizing that emergency

245 The ERG provides some information and guidance on handling Division 5.1 oxidizers. 246 DOT. The Emergency Response Guidebook: A Guidebook for First Responders During the Initial Phase of a Dangerous Goods/Hazardous Materials Transportation Incident (ERG), 2012 Edition: 356. See: http://phmsa.dot.gov/staticfiles//PHMSA/DownloadableFiles/Files/Hazmat/ERG2012.pdf (accessed on December 28, 2015). 247 See: http://www.csb.gov/csb-recommends-safety-improvements-to-us-department-of-transportation-emergency- response-guidebook-widely-used-by-firefighters/ (accessed on December 28, 2015). 248 See: http://www.csb.gov/assets/1/7/DOT_ERG__RFI10_1_14.pdf (accessed on December 28, 2015). 249 Technics, Inc., 2003. See: http://www.csb.gov/technic-inc-ventilation-system-explosion/ (accessed on December 28, 2015); DuPont Belle, 2010. See: http://www.csb.gov/dupont-corporation-toxic-chemical-releases/ (accessed on December 28, 2015); Millard Refrigerated Services, 2010. See: http://www.csb.gov/millard-refrigerated-services-ammonia-release/ (accessed on December 28, 2015); AL Solutions, 2010. See: http://www.csb.gov/al-solutions-fatal-dust-explosion/ (accessed on December 28, 2015).

West Fertilizer Company Final Report January 2016 123 U.S. CHEMICAL SAFETY AND HAZARD INVESTIGATION BOARD

responders will continue to reference the ERG for incidents involving HAZMAT releases at fixed facilities, CSB suggested that DOT consider adding guidance such as the information that first responders should obtain and reference when responding to an incident at a fixed facility, such as the company SDSs and submitted Tier II information.250 CSB advised that such guidance also should be in the front section of the ERG (for example, on pages 1 and 2). In addition, CSB suggested that DOT move the user’s guide from page 356 to page 1 or 2 of the next ERG edition to provide users with earlier guidance. CSB also urged DOT to take the following actions: • Review and revise the ERG to remove generic and vague information in the emergency response section of Guide 140 and other ERG sections. • Include a statement that urges emergency responders to reference other sources in addition to the ERG to obtain more detailed instructions when responding to emergency incidents at fixed facilities. First responders should obtain and refer to the company SDSs or submitted Tier II information when responding to an incident at a fixed facility. This information should also be in the introduction of the ERG (for example, on pages 1 and 2). • Revise the ERG to address the unpredictable behavior of fires involving FGAN and the potential for detonation within a very short time frame. DOT should consider recommending a more conservative response to fires involving FGAN by emphasizing firefighter and resident evacuation when the threat is to human lives rather than property. • Revise Guide 140 to include a separate discussion of the properties and behaviors unique to FGAN (such as the potential for detonation within a very short time frame) that might differ from those of other oxidizers covered by Guide 140. On its website, DOT provided a preview of updates for the 2016 Edition of the ERG.251 The link to the ERG updates provided by DOT showed that the review working group on the ERG had made the following changes: • Replaced written instructions on page 1 with a flow chart to show how to use the new ERG (2016). • Expanded the Table of Placards and updated the title to Table of Markings, Labels, and Placards and Initial Response Guide to Use on Scene. • Expanded the Railcar Identification Chart and the Road Trailer Identification Chart to two pages each. • Updated Table 1 and Table 3 based on new toxic inhalation hazard (TIH)252 data and reactivity research.

250 Additional information on Tier II information is noted in Section 8.5 of this report. 251 DOT. “Preview of Updates for the ERG 2016.” See: http://www.phmsa.dot.gov/pv_obj_cache/pv_obj_id_CDF7F93A3E0C2F808D9EA09C262749DAEF400200/filena me/ERG2016_Preview.pdf (accessed on December 28, 2015). 252 TIH is the abbreviation for toxic inhalation hazard. Under the Hazardous Materials Regulations (HMR), 49 CFR Parts 171–180, TIH materials are gases or liquids that are known (or presumed on the basis of tests) to be so toxic to humans as to pose a hazard to health in the event of a release during transportation. See:

West Fertilizer Company Final Report January 2016 124 U.S. CHEMICAL SAFETY AND HAZARD INVESTIGATION BOARD

• Updated pipeline emergency response information. • Added information about Globally Harmonized System of Classification and Labeling of Chemicals (GHS) markings. • Added all new dangerous goods and HAZMAT listed in the U.N. Recommendations on the Transport of Dangerous Goods, 19th Revised Edition. • Added information on emergency response assistance plans applicable in Canada.

Also, DOT provided a snapshot of the cover page of the 2016 edition of the ERG (Figure 64) on its website.

Figure 64. Cover Page of 2016 Edition of ERG (Source: DOT PHMSA)253 CSB noticed (from the preview of the 2016 edition of the ERG), that DOT and other authors of the ERG moved the warning statement, “A Guidebook for First Responders During the Initial Phase of a Dangerous Goods/Hazardous Materials Transportation Incident” from the left side of the cover page of the 2012 edition to the top of the cover page, as recommended by CSB. However, DOT and other authors

https://www.federalregister.gov/articles/2004/08/16/04-18705/hazardous-materials-enhancing-rail-transportation- security-for-toxic-inhalation-hazard-materials (accessed on January 20, 2016). 253 See: http://www.phmsa.dot.gov/staticfiles/PHMSA/ImageCollections/Images/ERG2016_Cover.png (accessed on December 28, 2015).

West Fertilizer Company Final Report January 2016 125 U.S. CHEMICAL SAFETY AND HAZARD INVESTIGATION BOARD

of the ERG did not include the statement “Only Intended for Use When Responding to Transportation Incidents” in bold on the front cover page of the 2016 edition of the ERG, as suggested by CSB in its response to the DOT RFI for the ERG revision.254 Instead, DOT and other ERG authors modified the statement “A Guidebook for First Responders During the Initial Phase of a Dangerous Goods/Hazardous Materials Transportation Incident” to “A guidebook intended for use by first responders during the initial phase of a transportation incident involving dangerous goods/hazardous materials.”255 Note that “transportation incident involving dangerous goods/hazardous materials” is in bold on the cover page of the 2016 edition of the ERG. 7.3.2 Safety Data Sheets CSB did not find any record that the WVFD consulted the SDS for FGAN and other chemicals present at the WFC facility during the incident. After the incident, CSB reviewed the SDS (that was current at the time of the WFC incident) provided by CF Industries and EDC, the manufacturers of the FGAN used at the WFC. The CF Industries SDS for FGAN (SDS Number 004) provided guidance on FGAN hazards in the December 11, 2012, revision of the SDS.256 Under the Hazards Identification, Emergency Overview heading (item three, page 1), CF Industries described FGAN: Strong oxidizer. Contact with combustible material will increase fire hazard. May undergo detonation if heated under confinement causing pressure buildup or if subjected to strong shocks. Solid AN when sensitized or during decomposition may become unstable and/or explosive. When AN is heated to decomposition it may produce vapor which contains nitrogen oxides (NOX). AN is an oxidizer and as such may increase the flammability and/or explosiveness of other substances. Use water to control fires involving AN, if water is compatible with burning material. AN itself is non-flammable. AN can cause irritation to eyes and skin and may be an inhalation discomfort in confined locations.257 Under the Firefighting Measures heading (item five, page 3), CF Industries noted: Flood burning ammonium nitrate fertilizer with large volumes of low pressure water. Do not use salt water, carbon dioxide, dry chemicals or foam extinguishers. Never attempt to smother fire, such as by sealing off, closing a compartment or building doors when fire occurs. Do not add steam. Ammonium nitrate fertilizer does not have the property of spontaneous combustion. Fire fighters should wear approved self-contained breathing apparatus to protect themselves from the

254 See: http://www.csb.gov/csb-recommends-safety-improvements-to-us-department-of-transportation-emergency- response-guidebook-widely-used-by-firefighters/ (accessed on December 28, 2015). 255 See: http://www.phmsa.dot.gov/staticfiles/PHMSA/ImageCollections/Images/ERG2016_Cover.png (accessed on December 28, 2015). 256 CF Industries has since removed its December 11, 2012, SDS for FGAN from its website. CF industries replaced the December 11, 2012, SDS for FGAN with a revised and updated SDS for FGAN (April 23, 2013). See: http://www.cfindustries.com/pdf/Ammonium-Nitrate-Amtrate-MSDS.pdf (accessed on January 20, 2016). On May 15, 2015, CF Industries published its current SDS for Amtrate FGAN fertilizer, which supersedes every other SDS. See: http://www.cfindustries.com/pdf/Amtrate_AN_Fertilizer_SDS_NA_FINAL.pdf (accessed on December 28, 2015). 257 CF Industries LLC. “Safety Data Sheet, FGAN.” SDS Number 004, revised December 11, 2012.

West Fertilizer Company Final Report January 2016 126 U.S. CHEMICAL SAFETY AND HAZARD INVESTIGATION BOARD

toxic fumes of decomposing ammonium nitrate, and protective clothing to guard against molten nitrate splashes should also be worn.258 This SDS for FGAN referred to NFPA 400 (Hazardous Materials Code, 2013 Edition) under its section on handling and storage but not in its section on firefighting measures. Although Chapter 11 of NFPA 400 provided some recommendations for safe storage, handling, and use of AN, it did not include any specific guidelines on FGAN firefighting measures. Annex E of NFPA 400 outlined some general procedures and suggestions on firefighting for FGAN incidents. Section E.2.1 of Annex E of the 2013 edition of NFPA 400 states: [S]hould a fire break out in an area where FGAN is stored, it is important that the mass be kept cool and the burning be promptly extinguished. Apply large volumes of water as quickly as possible. If fires reach massive and uncontrollable proportions, fire-fighting personnel should evacuate the area and withdraw to a safe location.259 Also, Section E.2.2 of NFPA 400 suggested the provision of as much ventilation as possible to the fire area.260 Although the FGAN SDS provided by CF Industries contained some useful insights and guidance on how to respond to FGAN-related fires, it did not clearly define “a distance” from which a fire could be “flooded” (one of the special firefighting procedures) and did not specify what “volumes of low pressure water” would be needed. CSB compared the firefighting measures in the CF Industries and EDC SDS with those in the SDS provided by a similar large technical grade AN (TGAN) manufacturer (Orica)261 and with those in the current edition of the DOT ERG (Table 9). Table 9. Comparison of Various AN-Related Firefighting Measures in April 2013 EDC SDS (FGAN) CF Industries SDS (FGAN) Orica AN SDS (TGAN) DOT ERG (2012 Edition) If confined when an ignition occurs, an explosion may occur. FGAN may undergo detonation if heated under confinement. FGAN may explode under confinement and high temperature. FGAN may explode from heat or contamination. Flood with water. Flood fire area from a distance. Fires should be fought from a protected location. Flood large fire with water from a distance.

258 Ibid. 259 NFPA. NFPA 400: Hazardous Materials Code, 2013 Edition. Quincy, MA: NFPA, 2013. 260 Ibid. 261 According to its website, Orica is the largest provider of commercial explosives and blasting systems to the mining and infrastructure markets, a global leader in the provision of ground support in mining and tunneling, and a leading supplier of sodium cyanide for gold extraction. See: http://www.orica.com/About-Us#.VlXviHarSUk (accessed on December 28, 2015).

West Fertilizer Company Final Report January 2016 127 U.S. CHEMICAL SAFETY AND HAZARD INVESTIGATION BOARD

Firefighters should wear proper protective equipment and self- contained breathing apparatus. For massive fires, use unmanned fire nozzles; if this is impossible, withdraw from area, and let burn. A major fire may involve a risk of explosion. For massive fire, use unmanned hose holders or monitor nozzles; if this is impossible, withdraw from area and let fire burn.

These examples of guidance for fighting fires involving FGAN illustrate hazards that were broadly defined and were not clearly communicated to emergency responders. The use of vague and broad terminologies in some of the guidelines compared in Table 9 indicates that the behavior of FGAN under heat and confinement is not clearly understood because no standardized methods are used to communicate the hazards of FGAN and possible firefighting procedures to emergency responders. Also, terms such as “massive,” “major,” “large,” “protected location,” and “distance” were not clearly defined in the guidelines. The CF Industries SDS and the ERG suggested “flooding” a fire involving FGAN from a distance, and the Orica SDS suggested fighting such fires from a “protected location.” The EDC SDS instructed firefighting personnel to flood with water but did not address the need to extinguish fires from a distance or to evacuate under massive fire situations. In these guidelines, the safe distance or protected location is not clearly defined. Hence, a firefighter must make a judgment to determine which location or area is protected, which distance is safe enough to fight a fire involving FGAN, how much water is needed for flooding, and which fire is massive or major. Unfortunately, firefighters are often forced to make these decisions without adequate training, information, preparation, and pre-planning. The WFC incident highlighted the need for greater awareness of FGAN hazards. In response to the 2013 explosion, EDC updated its SDS to include more information about the explosive hazards of AN and information for firefighters. The revised EDC SDS now advises firefighters to fight AN fires remotely because of the risk of explosion. If an AN-containing structure is fully engulfed in flames, firefighters are instructed not to fight the fire and to evacuate the surrounding area to at least a one-half-mile radius.262 7.4 Lessons Not Learned and Lessons Learned 7.4.1 Pre-West-Incident FGAN-Related Fires and Explosions: Lessons Not Learned CSB found that lessons learned from previous firefighter fatalities and emergency responses to FGAN- related incidents were not effectively disseminated to firefighters and emergency responders in other communities where FGAN is stored or used. Had those lessons been applied to the very similar situation

262 See: www.eldoradochemical.com/MSDS_Sheets/EDC/EDC_Products/EDCC_AN_Prill_SDS_Information_Bulletin_No v_2014.pdf (accessed on December 28, 2015).

West Fertilizer Company Final Report January 2016 128 U.S. CHEMICAL SAFETY AND HAZARD INVESTIGATION BOARD

in West, the firefighters and emergency responders might have better understood the risks associated with FGAN-related fires. Although the firefighters in West knew of the hazards associated with the tanks of anhydrous ammonia as a result of previous releases, they were not alert to the explosion hazard from the FGAN inside the warehouse. Although FGAN itself does not burn, the conditions under which AN might detonate when exposed to fire are unpredictable and not clearly understood, and current guidance does not offer consistent advice on how to attempt to guarantee firefighter safety. The deaths of the volunteer firefighters and emergency responders in West was not the first time that firefighters have been killed when responding to FGAN-related explosion incidents. On April 16, 1947, a ship containing 7,000 tons of wax-coated FGAN263 exploded in the port of Texas City, Texas, killing 581 people, including all 26 Texas City firefighters who responded to the incident.264 The November 29, 1988, Kansas City, Missouri, ammonium nitrate/fuel oil (ANFO) incident, although not directly related to an FGAN fire, is worth mentioning because of its severity, the important lessons learned from the incident, and its implication for emergency response. Six firefighters from the Kansas City, Missouri, fire department were killed in an explosion while they were extinguishing a fire at a construction site.265 About 40 minutes later, a second explosion occurred, followed by several minor explosions. Investigators later learned that after the first explosion, the battalion chief immediately pulled back and prevented other firefighters from entering the area. A command post was set up at a safe distance, which ultimately prevented more firefighter casualties. The initial fire involved a trailer/magazine containing blasting mixtures of FGAN, fuel oil, and aluminum pellets. One end of the trailer contained approximately 3,500 pounds of ANFO mixture while the remainder of the load was approximately 17,000 pounds of ANFO mixed with 5 percent aluminum pellets. In addition, a second explosion rocked another trailer/magazine loaded with approximately 1,000 30-pound sacks of ANFO mixture with 5 percent aluminum pellets.266 Both explosions in Kansas City created large craters where the two trailers had been parked, similar to the impact of the explosion in West. The first trailer explosion produced a swimming-pool-like crater that

263 Although the Texas City incident involved a form of wax-coated FGAN that is no longer manufactured for fertilizer purposes and a form of strong confinement (the locked hull of a ship), the lessons of confinement were developed and incorporated into industry guidance after the Texas City incident. 264 See: https://www.txdps.state.tx.us/dem/temo/archives/2013/Vol60No4/Articles/article2.htm (accessed on December 28, 2015). 265 The Texas City incident is discussed in this section to indicate that firefighters have lost their lives in the past because of a lack of pre-incident planning, inadequate training and information, and erroneous knowledge of the hazards with which they were dealing. The same observation applied to Kansas City, even though it was an ANFO incident; firefighters were not equipped with the right information and had inadequate knowledge of the hazards of the explosive material (ANFO) that they dealt with that evening, and they lost their lives as a result. 266 USFA. “Six Firefighter Fatalities in Construction Site Explosion; Kansas City, Missouri.” Technical Report Series,” USFA-TR-024, November 1988. See: http://www.usfa.fema.gov/downloads/pdf/publications/tr024.pdf (accessed on January 20, 2016).

West Fertilizer Company Final Report January 2016 129 U.S. CHEMICAL SAFETY AND HAZARD INVESTIGATION BOARD

was 80 feet in diameter with a depth of 8 feet, connected to a smaller crater that was 20 feet in diameter and 6 feet deep. The second trailer explosion gouged a crater approximately 100 feet in diameter and 8 feet deep, similar in dimensions to the crater resulting from the explosion in West, Texas. The Kansas City incident investigation determined that the firefighters were not told specifically about the contents of the trailer/magazine, although the dispatcher did caution them about explosives on the site. The firefighters did not report any indication of the presence of warning placards on the trailers because there was no requirement by firefighters to report the presence or absence of warning placards over the radio upon their arrival at a scene of a fire. Also, it was not clear whether the firefighters realized that the trailers housed an explosive magazine.267 No record of communication among the dispatch official, fire chief, and firefighters indicated that the firefighters knew the contents of the magazine, and the firefighters did not seem alarmed when they arrived at the site. In addition, the fire department was not aware of the presence of the trailers/magazines or their contents before the incident because of a lack of jurisdictional authority. The Kansas City Fire Prevention and Protection Code did not require the city engineer to notify the fire department that blasting permits had been issued, although this provision was changed immediately after the incident. The Kansas City Fire Department had no authority or responsibility to inspect the construction site because it was a state enclave.268 Shortly after the Kansas City explosions, the USFA produced a technical report (USFA-TR- 024/November 1988)269 with findings of its investigation and lessons learned. Although the fertilizer- related incidents in Texas City and West did not involve explosives per se, the Kansas City incident further illustrated that the lack of knowledge about the stored HAZMAT and the lack of pre-incident planning by firefighters before their response led to the fatalities. Most of the recommendations based on lessons learned emphasized the need to be properly prepared through pre-incident planning and through the provision of clear information to firefighters and emergency responders dealing with fires involving HAZMAT. CSB observed that within the last 6 years, three notable FGAN-related incidents in Texas involved emergency responders. Subsequently, CSB reviewed the emergency response activities associated with the FGAN-related fires that occurred in 2009 at the EDC facility in Bryan, Texas, and in 2014 at the East Texas Ag Supply facility in Athens, Texas. On Thursday, July 30, 2009, at about 11:40 am CDT, a fire broke out at the EDC facility in Bryan. The EDC facility stores FGAN and blends it with other materials to create fertilizer. The fire at the EDC fertilizer plant led to the evacuation of more than 80,000 residents in the Bryan and College Station area.

267 An explosive magazine is an enclosed storage structure for holding explosives. 268 A state enclave is any portion of a state that is completely surrounded by the territory of another state. 269 USFA. “Six Firefighter Fatalities in Construction Site Explosion; Kansas City, Missouri.” Technical Report Series,” USFA-TR-024, November 1988. See: http://www.usfa.fema.gov/downloads/pdf/publications/tr024.pdf (accessed on January 20, 2016).

West Fertilizer Company Final Report January 2016 130 U.S. CHEMICAL SAFETY AND HAZARD INVESTIGATION BOARD

Although the storage structure burned to the ground, unlike the incident at the WFC facility, no explosion, loss of life, or major injuries were recorded. At Bryan, the firefighters were informed that a welder had accidentally heated an FGAN bin and that the chemical was smoldering. The firefighters decided not to fight the fire, evacuated the area, and let the facility burn to the ground, without any explosion. Their knowledge of FGAN and the risks associated with a probable explosion most likely led the Bryan firefighters to decide to evacuate. Figure 65 shows the post-incident aerial view of the EDC facility wooden fertilizer warehouse.

Figure 65. Post-Incident Aerial View of EDC Facility Wooden Fertilizer Warehouse (Source: Bryan-College Station Eagle) After the incident, the Bryan Fire Department—in conjunction with the emergency management divisions for Brazos County, the city of Bryan, the city of College Station, and Texas A&M University—performed an emergency review and analysis and released an after-action report and improvement plan. These documents were shared with fire departments and emergency response agencies that were involved in the incident response and investigation, including local and regional emergency response agencies—mostly

West Fertilizer Company Final Report January 2016 131 U.S. CHEMICAL SAFETY AND HAZARD INVESTIGATION BOARD

in the Brazos Valley area, where Brazos County, the cities of Bryan and College State, and Texas A&M University are located—and other state agencies that responded to the incident.270 The 2009 EDC fire after-action report for Brazos Valley highlighted the need for emergency response departments to reflect on protection, response, and recovery activities that occurred during the EDC incident, despite the fact that the community-wide response to the incident resulted in no loss of life or serious injuries. In addition, the after-action report identified potential strengths to be maintained and built on, noted potential areas for further improvement, and suggested recommendations for corrective and preventive actions based on the incident. The after-action report indicated: The Texas Division of Emergency Management provides the National Emergency Response and Rescue Training Center (NERRTC) funding to develop regional plans that will enable local emergency management to rapidly respond to disasters using the region’s resources before requesting assistance from State and Federal partners. Within that scope, NERRTC also develops after-action reports on behalf of local, regional and state governments that have been affected by major disasters. As in the case of the EDC fire, lessons learned help recognize needs for plans, policies and procedures revisions to enhance the effectiveness of response (personnel, teams and/or equipment).271 Unfortunately, CSB did not find any record that the WVFD requested or received a copy of the Brazos Valley after-action report and improvement plan. In addition, no record suggested that lessons learned from the EDC incident were discussed or shared with firefighters at West.272 Although circumstances in West might have differed from those in Bryan, if lessons learned had been effectively relayed among the firefighters at West, the volunteer firefighters who responded to the WFC incident possibly could have drawn on the experience of Bryan firefighters to inform response strategies, both in the pre-planning stages and in the response to the incident on the night of April 17, 2013. 7.4.2 Post-West Incident FGAN-Related Fire: Lessons Learned On May 29, 2014, at around 5:45 pm, a fire involving FGAN occurred at the East Texas Ag Supply facility in downtown Athens, Texas. Emergency dispatchers and the Athens Police Department promptly notified firefighters from the Athens Fire Department (AFD).273 Emergency response units from the AFD arrived on the scene of the fire at 5:50 pm and found fire and smoke coming from the northwest end of the 3,500-square-foot East Texas Ag Supply facility. This facility was built with masonry bricks and combustible wooden structures, similar to construction at the WFC facility.274 The AFD chief arrived

270 EDC. “2009 El Dorado Chemical Fire After-Action Report for Brazos Valley,” August 11, 2009. 271 Ibid. 272 CSB found that several surviving West firefighters interviewed after the WFC incident did not have adequate information about the EDC incident at Bryan (approximately 100 miles south of West, Texas). 273 The AFD was organized as a volunteer department in 1911. Currently, the AFD is a fully paid fire department with two stations and 27 firefighters. See: http://athenstexas.us/fire.cfm (accessed on December 28, 2015). 274 Shortly after the April 17, 2013, incident at the WFC facility in West, Texas, an investigative reporter from the Dallas news station (WFAA) entered the Athens facility with a camera crew and revealed that East Texas Ag Supply

West Fertilizer Company Final Report January 2016 132 U.S. CHEMICAL SAFETY AND HAZARD INVESTIGATION BOARD

about 2 minutes after the first responding units were dispatched to the site of the incident, and he found that the fire had self-ventilated at the northwest end. On the basis of his observation of the enormous scope of the fire and the possibility of detonation of FGAN in the engulfed building, the fire chief promptly decided to let the East Texas Ag Supply facility burn to the ground instead of attempting to fight the fire.275 He ordered his firefighters to retreat from the scene and began an extensive evacuation of the downtown Athens, Texas, area. The Athens Police Department coordinated the evacuation of the nearby residential areas, setting up an initial three-block evacuation perimeter, which was later expanded to five blocks.276 Fortunately, no injuries were associated with this incident. On June 2, 2014, the State Fire Marshal’s Office (SFMO) completed its investigation of the East Texas Ag Supply facility incident and released its findings, ruling and classifying the source of the fire as undetermined.277 The East Texas Ag Supply facility was a privately owned business with annual revenues estimated between $10 million to $20 million and a work force of approximately nine employees. The East Texas Ag Supply facility was an FGAN and potash fertilizer storage facility, and it was registered under Standard Industrial Classification Code 5191 (Farm Supplies) and North American Industry Classification System (NAICS) Code 424910 (Farm Supplies Merchant Wholesalers).278 On the day of this incident, the East Texas Ag Supply facility received approximately 70 tons of FGAN (total) and 100,000 pounds of potash, which were stored inside the building when the fire occurred. CSB gathered information concerning the East Texas Ag Supply incident from the emergency responders and the facility and also conducted an interview with the AFD fire chief. According to the incident statement provided to CSB, the Athens, Texas, fire chief stated: We allowed the fire to mitigate itself, with research showing that some such facilities had burned out with no explosions. We had learned a lot from West and had already removed other products that could cause contamination and had made the owner remove his diesel tractor from within the building and to keep it off site when not in use. We feel this was a major deterrent from having a detonation.279 Figure 66 and Figure 67 show photographs of the East Texas Ag Supply facility during the fire incident.

was receiving and storing the same substance thought to have been involved in the explosion in West. See: http://www.wfaa.com/story/news/local/investigates/2014/08/18/14029198/ (accessed on December 28, 2015). 275 According to the Athens, Texas, fire chief, the initial plan of action was to engage the fire at the incipient stage, but by the time he arrived on scene, the chief knew that the fire was well past the incipient stage and that the quantity of water needed to squelch the fire at that stage was beyond the capabilities of the equipment on hand. He gave the order for his men to cease firefighting based on his early observations and to begin evacuation activities. 276 The City of Athens police chief was in charge of the evacuation and the control of traffic. The police chief set the initial evacuation perimeter at three blocks from the facility based on the immediate resources available to the police chief at that time; the perimeter subsequently was expanded to five blocks. Police and fire personnel conducted the evacuation notification by using their public address systems and going door to door. 277 See: http://www.tdi.texas.gov/news/2014/news201443.html (accessed on December 28, 2015). 278 After the WFC incident in West, the city of Athens, Texas, received a lot of attention because of the presence of a fertilizer storage facility downtown that was similar to and older than the WFC facility. Wooden bins were used for storage of AN at the East Texas Ag Supply facility. 279 The fire incident statement was provided to CSB via email on October 3, 2014, by the Athens, Texas, fire chief.

West Fertilizer Company Final Report January 2016 133 U.S. CHEMICAL SAFETY AND HAZARD INVESTIGATION BOARD

Figure 66. Dark Grey Smoke280 Originating from East Texas Ag Supply Facility in Downtown Athens, Texas (Source: Athens Fire Department)

280 However, this smoke was not as black as the smoke from the WFC fire (see Section 4 of this report).

West Fertilizer Company Final Report January 2016 134 U.S. CHEMICAL SAFETY AND HAZARD INVESTIGATION BOARD

Figure 67. Dark Smoke Combined with Flames at East Texas Ag Supply Facility in Athens, Texas281 (Source: Athens Fire Department) In an interview, the fire chief reported that the AFD conducted extensive pre-planning, visited the East Texas Ag Supply fertilizer storage facility on multiple occasions, and instructed the owner of the facility to repair anything that seemed to be hazardous or noncompliant with the International Fire Code, which the city of Athens adopted in 2009. SFMO officials had also visited the facility previously on at least two occasions and compelled the owner of the East Texas Ag Supply facility to fix old broken machinery that was onsite.282 In addition to these visits from SFMO, AFD officials often toured the facility to randomly inspect loading and unloading operations and to take note of other fire safety issues, including the location and spacing of exits within the facility. Pre-incident assessment of the facility indicated that the fertilizer storage bins were old and constructed of double layer plywood, each about 10 feet from the ceiling of the 35- to 40-foot-tall building, with three of the bins used to store FGAN. Similar to the WFC facility in West, the East Texas Ag Supply facility had no sprinkler systems, and the building was

281 At the East Texas Ag Supply facility incident in Athens, Texas, the flame appeared to be the normal yellow color of many wood and other combustibles burning in normal air. Unlike the WFC incident, there was no detonation of FGAN; hence, no evidence of brighter (higher-temperature) white flame was observed before the detonation at West (see Section 4 of this report). 282 In addition to the actions taken by the city of Athens before the East Texas Ag Supply fire on May 29, 2014, the SFMO—as part of its endeavors to share the lessons learned from the West, Texas, AN explosion—went to all 66 counties with businesses that had 10,000 pounds or more of AN. The statewide tour started on December 12, 2013, and was completed on December 17, 2014. Local first responders, LEPC members, local officials, business staff, and citizens were invited to the public meetings organized by the SFMO. On April 3, 2014, the SFMO visited Athens, Texas (Henderson County) to enlighten the public on the hazards of FGAN. See: http://www.tdi.texas.gov/fire/fman.html (accessed on December 28, 2015).

West Fertilizer Company Final Report January 2016 135 U.S. CHEMICAL SAFETY AND HAZARD INVESTIGATION BOARD

constructed with masonry brick walls on three sides, covered with an asphalt shingle roof. Figure 68 shows the East Texas Ag Supply facility, including its masonry brick walls completely burned to the ground.

Figure 68. East Texas Ag Supply Facility’s Masonry Brick Walls, Engulfed by Fire and Smoke (Source: Athens Fire Department) The Athens community has two community alert systems, CodeRED and FIRST Alert. The CodeRED community alert system was developed to notify residents of any emergency. The FIRST Alert system is directed from the Henderson County 911 dispatch center.283 The protocol for use of the CodeRED system indicates that during any emergency situation or a fire incident, the fire chief or a designee (usually the police chief) would give the order for the CodeRED notification. Once a CodeRED order is given, the designee or authorized emergency staff member is expected to make a recorded speech, which is then broadcast over the Internet and to all landline telephones in the city. The process also notifies mobile phone subscribers. The CodeRED system was not deployed during the East Texas Ag Supply incident to notify Athens residents. 284 However, the CodeRED alert system was used the following day (May 30, 2014) to notify the community about the post-incident status of the East Texas Ag Supply facility and the conditions surrounding that facility. The Athens, Texas, fire chief compared the city’s situation to that in West and stated that the AFD conducted additional research and identified how best to respond to any emergency situation that could

283 Athens, Texas, is located in Henderson County, about 70 miles southeast of Dallas, Texas. 284 On the day of the incident, there was no clear communication on the designation of the appropriate party to make the outgoing emergency notification message. The fire chief maintained that because he was occupied with command firefighting operations, the task of making the announcement should have been transferred to the Athens Police Department (police chief); unfortunately, this was not the case. Moving forward with the post-incident critique, the fire chief indicated that standardizing the designation of who makes the announcement would be better defined for future community notifications.

West Fertilizer Company Final Report January 2016 136 U.S. CHEMICAL SAFETY AND HAZARD INVESTIGATION BOARD

arise because of the East Texas Ag Supply facility. In West, the WFC plant was primarily a fertilizer facility, with anhydrous ammonia tanks, carts, loaders, insecticides, and other potential contaminants for FGAN. On the basis of the aftermath of the WFC explosion in West, Henderson County reviewed its existing local emergency planning committee (LEPC) process. About a year before the Athens fire incident, the natural disaster planning LEPC was expanded, with the fire chief as its chair, to address emergencies arising from human activities or industrial facilities. Although the cause of the Athens fire incident has not been determined, the city of Athens initiated reforms aimed at protecting the city from another incident in the future. On May 29, 2015, a year after the fire at the East Texas Ag Supply facility, the city passed an ordinance that banned the bulk storage of FGAN in Athens. The ordinance included a mandatory reporting process for facilities with limited quantities of hazardous chemicals such as FGAN so that they would report the quantities of the hazardous chemicals in their facilities, thereby enabling VFDs to conduct inspections at such facilities.285 CSB investigators conducted a teleconference with the city of Athens fire chief on June 24, 2015. The fire chief stated that the East Texas Ag Supply facility had been torn down and will not be rebuilt within the Athens city limits. In addition, Athens is now considering efforts aimed at monitoring other hazardous chemicals (similar to FGAN) that are currently stored by facilities within the city limits.286 7.5 Other Post-Incident Investigation Reports Related to Firefighting After the fire and explosion at the WFC facility, several other agencies conducted investigations of the incident. EPA and OSHA conducted their investigations for violations of environmental and workplace safety and health laws, while the Texas SFMO and NIOSH conducted their investigations on the firefighters and the emergency response at the WFC facility. The ATF investigation of the WFC incident is ongoing. 7.5.1 Texas State Fire Marshal’s Office (SFMO) The SFMO 287 served as the lead Texas investigatory agency for the WFC incident, working in collaboration with ATF.288 On May 15, 2014, the SFMO released its line-of-duty deaths investigation of the West, Texas, incident, “Firefighter Fatality Investigation” (Investigation FFF FY 13-06).289 The SFMO report described the incident and issued recommendations focused on the emergency response to the WFC incident, including the conditions that led to the fire and explosion. The report indicated that the firefighters at West were not prepared for what they faced on the night of April 17, 2013. Also, the

285 Section 8.7.3 of this report discusses the Athens City ordinance in detail. 286 Section 8.7 of this report addresses state and local regulatory developments (post-West, Texas, and Athens, Texas, incidents). 287 See: http://www.tdi.texas.gov/fire/documents/fmohistory.pdf (accessed on December 28, 2015). 288 Section 1.2.1 of this report addresses the ATF investigation. 289 See: http://www.tdi.texas.gov/reports/fire/documents/fmloddwest.pdf (accessed on December 28, 2015).

West Fertilizer Company Final Report January 2016 137 U.S. CHEMICAL SAFETY AND HAZARD INVESTIGATION BOARD

SFMO highlighted that the emergency responders were victims of a “systemic deficiency in the training and preparation” of the WVFD, attempting to put out a fire that was beyond its incipient stage290 and could no longer be extinguished. The report also included findings related to training and operational best practices for firefighters. On page 47, the SFMO report identified training deficiency as a key finding: The State of Texas has not adopted minimum training standards for volunteer fire departments; however, all fire department members must be properly trained and qualified to perform their assigned duties. Members who are authorized to work in high-level assignments (rank) must be trained and evaluated in performing those duties. All members must be periodically re-evaluated to ensure that they are capable of performing their assigned duties safely and effectively.291 The SFMO firefighter fatality report on the WFC incident further proposed several recommendations based on training of firefighters, including establishment of “realistic training and educational requirements for all positions and ranks and a promotional process that ensures that ranking members demonstrate a progressive knowledge, skill, and ability to perform their assigned duties and responsibilities according to their position in the organization.” The SFMO report concludes by recommending that “fire departments should develop standard operating guidelines and appropriate training involving those critical findings specific to incident command, strategy and tactics, and firefighter safety.”292 The SFMO report findings and recommendations are similar to those of CSB in this report with regard to the emergency response in West. Section 7.2 of this report describes in detail pre-incident planning, fire scene risk assessment, and development of a clearly defined incident command structure for emergency situations.293 7.5.2 NIOSH Findings and Recommendations In 1998, the U.S. Congress funded NIOSH to establish the Fire Fighter Fatality Investigation and Prevention Program, which investigates on-the-job fatalities of firefighters and provides improvement recommendations to the profession.294 On November 12, 2014, NIOSH released its report on the emergency responder fatalities caused by the WFC explosion.295 The report, “9 Volunteer Fire Fighters and 1 Off-Duty Career Fire Captain Killed by an FGAN Explosion at a Fertilizer Plant Fire–Texas,” identified contributing factors to the firefighter fatalities, specifically failure to recognize hazards associated with FGAN, limited pre-incident planning of the commercial facility, quick spread of the fire

290 The term “incipient” has been widely used in the firefighting community and in various fire codes, including NFPA codes. However, CSB believes that it could be easily misinterpreted and imposes on firefighters a responsibility to make a subjective determination regarding the seriousness of a fire. 291 See: http://www.tdi.texas.gov/reports/fire/documents/fmloddwest.pdf (accessed on December 28, 2015). 292 Ibid. 293 Section 7.1 of this report considers the firefighter response and Section 7.2 discussed details of factors contributing to the firefighter and other emergency responder fatalities in West, Texas. 294 See: www.cdc.gov/niosh/fire (accessed on December 28, 2015). 295 See: http://www.cdc.gov/niosh/fire/pdfs/face201311.pdf (accessed on December 28, 2015).

West Fertilizer Company Final Report January 2016 138 U.S. CHEMICAL SAFETY AND HAZARD INVESTIGATION BOARD

to uncontrollable size, unexpected detonation of approximately 40 to 60 tons of solid FGAN, emergency responders working within the blast radius at the time of the explosion, and large non-sprinklered wood construction in the commercial structure.296 In addition, NIOSH issued recommendations to prevent a similar incident from recurring. Recommendations included pre-incident planning inspections of facilities within the jurisdiction of a fire department; development of a written risk management plan; fire department use of risk management principles at all structure fires, especially for incidents involving high-risk hazards; development, implementation, and enforcement of a written incident management system to be applied during all emergency incident operations; standards for firefighters to wear a full array of turnout clothing and personal protective equipment (PPE) appropriate for the assigned tasks; and firefighter training that meets or exceeds NFPA 1001 (Standard for Fire Fighter Professional Qualifications). CSB concluded that most of the key contributing factors and recommendations cited by NIOSH in its WFC incident investigation report are similar to those of CSB.297 7.6 Summary of Incident Emergency Response CSB found no evidence of pre-incident planning addressing the likelihood of a fire involving FGAN at the WFC facility. As a result, the firefighters who responded to the WFC fire did not take the time to critically assess the situation on the ground before the explosion occurred. Senior emergency response personnel from the WVFD arrived at the scene of the incident at different times, and firefighters who were ICS trained and certified in the NIMS process did not assume the role of IC to establish, implement, and coordinate an incident command structure and incident management system for the fire emergency. The firefighters did not fully understand the hazards of FGAN detonation and consequently shifted their firefighting tactics to strategies to ensure that the anhydrous ammonia tanks onsite did not rupture. Also, the emergency response personnel at West did not take the time to implement an incident management system plan, which would have facilitated the prompt and proper evacuation of the nearby residents. The volunteers who responded to the WFC facility fire did not have sufficient HAZMAT training to make an informed decision on how best to respond to the fire at the fertilizer facility. Furthermore, lessons learned from previous firefighter fatalities and emergency responses to FGAN-related incidents were not effectively disseminated to firefighters and emergency responders in other communities, such as West, where FGAN is stored or used. A review of firefighter training courses, information in emergency response guides, manufacturers’ manuals, and other information available to emergency responders concerning AN-related fires at incident sites confirms that such materials place little emphasis on how to effectively respond to fire

296 NIOSH. “9 Volunteer Fire Fighters and 1 Off-Duty Career Fire Captain Killed by an Ammonium Nitrate Explosion at a Fertilizer Plant Fire–Texas.” NIOSH Report on Death in the Line of Duty. Report Number F2013-

  1. See: http://www.cdc.gov/niosh/fire/pdfs/face201311.pdf (accessed on December 28, 2015).

297 Ibid.

West Fertilizer Company Final Report January 2016 139 U.S. CHEMICAL SAFETY AND HAZARD INVESTIGATION BOARD

incidents involving the handling and storage of FGAN and might altogether be insufficient to enable firefighters to recognize the potential magnitude of an FGAN explosion. The commonly used emergency response guides and manuals contain inconsistent information regarding the best response to FGAN- related fires. In a fire situation, an FGAN explosion could occur at any time, and without knowing how long an AN-related fire has been burning, firefighters might not be aware of how much time they have to make informed emergency response decisions before an explosion occurs. That is why in the DECIDE model widely used by HAZMAT responders, after it is determined that HAZMAT is present, the next step is to estimate likely harm, without intervention.298 Above all, the conditions under which FGAN might detonate when exposed to a fire are unpredictable and not clearly understood, and current guidance does not offer best practices to protect firefighters from FGAN fire and detonation hazards. 7.7 Firefighter Training Grants and Programs 7.7.1 Need for Training CSB found that currently no federal requirements compel municipal fire departments to develop site- specific pre-incident plans with businesses and chemical plants that process and store HAZMAT such as FGAN. To implement any reform in nationwide inspection of businesses and facilities storing hazardous chemicals, determining the number of fire departments and firefighters in the United States (especially in rural communities such as West, Texas) is important. In addition, it is important to understand how prepared fire departments and firefighters should respond to fires involving FGAN. Part of being prepared is being properly trained on the hazards surrounding a community. 7.7.1.1 U.S. Firefighter Statistics CSB conducted a review of firefighter statistics across the country at the time of the WFC fire and explosion. The review indicated that the majority of the nation’s firefighters are volunteers and that 85 percent of fire departments are composed of volunteer firefighters. In addition, the NFPA estimated the number of firefighters in the United States in 2013 at more than a million, including 345,600 career firefighters (31 percent of the total) and 786,150 volunteer firefighters (69 percent of the total).299 Approximately 95 percent of all volunteer firefighters serve in local fire departments that protect fewer than 25,000 people.300 More than half of these volunteer firefighters support small rural departments that protect fewer than 2,500 residents, such as the WVFD in West, Texas.301 At the end of 2012, an estimated 30,100 fire departments operated in the United States. Of these, 2,610 (9 percent of all departments) were composed of only career firefighters; 1,995 (7 percent) relied on mostly career

298 Ludwig Benner. “D.E.C.I.D.E in Hazardous Materials Emergencies.” See: http://www.henrycoema.org/EMA/HazMat_Training_Materials_files/DECIDE.pdf (accessed on January 8, 2016). 299 See: http://www.nfpa.org/research/reports-and-statistics/the-fire-service (accessed on December 28, 2015). 300 Ibid. 301 Ibid.

West Fertilizer Company Final Report January 2016 140 U.S. CHEMICAL SAFETY AND HAZARD INVESTIGATION BOARD

firefighters; 5,445 (18 percent) were supported by a mostly volunteer firefighting force; and 20,050 (67 percent) depended entirely on volunteer firefighters.302 Despite the fact that the majority of the nation’s firefighters are volunteers and that 85 percent of fire departments are composed of volunteers, no federal requirements mandate that VFDs work with businesses and chemical plants that process and store HAZMAT (such as FGAN) to develop site-specific pre-incident plans. 7.7.1.2 U.S. On-Duty Firefighter Fatalities Over the last few decades, the fire service industry has made notable advancements, including building code improvements, incorporation of sprinkler systems in commercial and industrial buildings, and development of improved personal protective gear and technologically advanced apparatus. In addition, several laws and programs have been implemented to improve firefighter health and safety in the United States.303,304,305 Despite these laws and improvements, many firefighters are injured or killed while on duty each year. The USFA has recorded the number of firefighter fatalities and conducted an annual analysis since 1977, noting almost 4,500 on-duty firefighter fatalities in the United States in the last 35 years.306 By the end of 2013, 101 firefighter fatalities were reported for the year nationally, including those in West, Texas; four Houston Fire Department firefighters who died while responding to a hotel fire on May 31, 2013; and 19 firefighters from the Prescott Fire Department who lost their lives while responding to a wildland fire in Arizona on June 30, 2013. The NFPA also publishes its own annual study detailing on-duty firefighter fatalities in the United States.307 The annual number of fatalities for volunteer firefighters is substantially higher than the annual number of fatalities for career firefighters (Figure 69).

302 NFPA, Fire Analysis and Research Division. “US Fire Department Profile 2012.” See: http://www.kolb.net/FireReports/2013/US_DeptProfile2012.pdf (accessed on December 28, 2015). 303 Fabio, A. et al. “Incident-level risk factors for firefighter injuries at structural fires.” Journal of Occupational and Environmental Medicine, 44(11) (2002): 1059–63. 304 NFPA. NFPA 1500: Standard on Fire Department Occupational Safety and Health Program. Quincy, MA: NFPA, 2013. 305 Moore-Merrell, L. et al. Contributing Factors to Firefighter Line-of-Duty Injury In Metropolitan Fire Departments in the United States. Emmitsburg, MD: USFA, 2008. 306 USFA. See: http://www.usfa.fema.gov (accessed on December 28, 2015). 307 NFPA. “U.S. Fire Service.” See: http://www.nfpa.org/research/fire-statistics/the-us-fire-service (accessed on December 28, 2015).

West Fertilizer Company Final Report January 2016 141 U.S. CHEMICAL SAFETY AND HAZARD INVESTIGATION BOARD

Figure 69. Comparison of Volunteer and Career Firefighter Deaths (1977–2013) (Source: NFPA)308 This discrepancy could be due to a number of factors, such as the larger population of volunteer firefighters (more than 67 percent of all firefighters nationwide) or the lack of standardized training requirements for volunteers. Of the 82 firefighter fatalities in 2012, 39 were volunteer firefighters (47.6 percent of the total), and 32 were career firefighters (39 percent of the total); in addition, four part-time wildland firefighters, three contract wildland firefighters, two paid on-call firefighters, one part-time (paid) firefighter, and one industrial firefighter lost their lives (1.2 percent of the total). CSB believes that adequate training is essential to reduce on-the-job firefighter fatalities, especially among volunteer firefighters who are not required to complete the same level of training as career firefighters. 7.8.1.3 U.S. Volunteer Firefighter Statistics A VFD is a fire department composed of volunteers, usually residents or nearby citizens, who perform fire suppression and other related emergency services for a local jurisdiction or community. The U.S. Department of Labor (DOL) classifies volunteer firefighters as firefighters who receive either no compensation or nominal fees (up to 20 percent of the compensation that a full-time firefighter would receive in the same capacity).309 DOL allows volunteer firefighters to receive benefits such as worker’s compensation, health insurance, life insurance, disability insurance, pension plans, length-of-service

308 See: http://nysfma.org/diyFiles/FirefighterFatalitiesinttheUS2013.pdf (accessed on December 28, 2015). 309 Dodge, G., and M. Mullarkey. Managing Volunteer Firefighters for FLSA Compliance: A Guide for Fire Chiefs and Community Leaders. Fairfax, VA: International Association of Fire Chiefs, 2006.

West Fertilizer Company Final Report January 2016 142 U.S. CHEMICAL SAFETY AND HAZARD INVESTIGATION BOARD

awards, and property tax relief. DOL also states that volunteer firefighters may be paid nominal fees on a per-call or per-shift basis or on the basis of various service requirements, but they may not be compensated based on productivity (such as receiving an hourly wage). Career firefighters are fully compensated for their services. Some volunteer firefighters might serve in a hybrid fire department that relies on both full-time and volunteer firefighters. In this approach, career firefighters can regularly staff a station for rapid response with needed apparatuses, and the volunteers can provide supplementary staffing and staff apparatuses before, during, and after an incident or while full- time career personnel are out of service for training. Moreover, volunteer firefighters can sometimes compose a group of part-time or on-call firefighters who have other occupations when not engaged in occasional firefighting. The West volunteer firefighters held other (full-time) jobs and were not financially compensated for their time. Some VFDs compensate their firefighters as employees during the time that they are responding to or attending to an emergency scene and possibly during training. An on-call firefighter can also volunteer time for other nonemergency duties, such as training, fundraising, and equipment maintenance. In addition to fundraising, fire departments and emergency response services often seek alternative sources to support and fund their daily operations and long-term plans. Federal and state funding is available through grants from DHS and FEMA to assist emergency responders and fire departments in addressing EMS and firefighter-related needs such as training and equipment procurement and maintenance. National programs that support the need for emergency preparedness, including firefighter training, are discussed in the next section of this report. 7.7.2 National Firefighter Training Funds and Programs 7.7.2.1 U.S. Department of Homeland Security (DHS) DHS was formed after the terrorist attacks of September 11, 2001, as part of a national effort to safeguard the United States against terrorism. The mission of DHS includes preventing terrorism and enhancing security, managing U.S. borders, administering immigration laws, securing cyberspace, and ensuring disaster resilience. DHS also provides the coordinated comprehensive federal response in the event of a terrorist attack, natural disaster, or other large-scale emergency while working with federal, state, local, and private sector partners to ensure a swift and effective recovery effort. DHS builds a ready and resilient nation through efforts to accomplish the following: • Bolstering information sharing and collaboration. • Providing grants, plans, and training to homeland security and law enforcement partners. • Facilitating rebuilding and recovery.310 Although the scope of DHS is expansive, it contains many components, including FEMA, where much of the federal funding flows to various FEMA programs that assist in elements of national resiliency, such as

310 See: http://www.dhs.gov/building-resilient-nation (accessed on December 28, 2015).

West Fertilizer Company Final Report January 2016 143 U.S. CHEMICAL SAFETY AND HAZARD INVESTIGATION BOARD

rebuilding and recovering after a disaster (such as the West, Texas, incident) or encouraging emergency response preparedness training. Federal Emergency Management Agency (FEMA) FEMA was created in 1979 in an effort to coordinate the federal government’s role in preparing for, preventing, mitigating the effects of, responding to, and recovering from all domestic disasters, whether natural or man-made, including acts of terror.311 On March 1, 2003, FEMA became part of DHS, and FEMA’s Office of National Preparedness was given responsibility for helping to ensure that the nation’s first responders were trained and equipped to deal with WMD along with other types of disasters. FEMA supports preparedness by developing policies; ensuring that adequate plans are in place and are validated; defining the necessary capabilities required to address threats; providing resources and technical assistance to state, local, tribal, and territorial partners; and integrating and synchronizing preparedness efforts throughout the nation. DHS and FEMA achieve their mission of ensuring disaster resiliency partly by providing funding and support to various federal programs that are tasked with preparing the nation to respond to various hazards, such as community exposure to chemicals and hazardous materials. Fire departments use the programs to assist in developing a well-organized, equipped, and trained function for the communities they serve. CSB reviewed the nationwide funding mechanisms available to career and VFDs through DHS and FEMA. Volunteer firefighters similar to those who responded at West have access to these firefighting resource funds if they can demonstrate that they have a need for it. CSB examined whether federal and state funds could be allocated to fire departments to assist them in obtaining the training that firefighters need to address fires and explosions involving HAZMAT such as FGAN. Grants It is important to understand the process for allocating grants to emergency responders such as fire departments. First, this section discusses the application process for a DHS FEMA grant. Second, the FEMA Grant Programs Directorate (GPD), the program that administers these grants once they receive proposals from applicants for funding is discussed. Third, the DHS FEMA preparedness (non-disaster) grants are described. Fourth, the Assistance to Firefighter Grants (AFG) Program is discussed in detail and in relation to funding in Texas. Specifically, the AFG, Staffing for Adequate Fire and Emergency Response (SAFER) grants, and the Fire Prevention and Safety (FP&S) grants are examined. DHS FEMA Grants Application Process Often federal grant funding flows to the local level through the states. However, some states provide direct funding for emergency medical services (EMS), especially in rural areas. On the other hand, some states have no funding for local programs. Most SFMOs and EMS bureaus offer technical assistance to

311 See: http://www.fema.gov/about-agency (accessed on December 28, 2015).

West Fertilizer Company Final Report January 2016 144 U.S. CHEMICAL SAFETY AND HAZARD INVESTIGATION BOARD

local agencies and subsidized training programs to first responders.312 A large portion of the federal grant budget is passed to the states through formula or block313 grants. The states then decide how to use the grant money. However, some direct federal grant programs are for fire departments and EMS agencies such as the AFG.314 Direct grants are given specifically to the applying agency, but pass-through grants315 require the state to apply to the federal government and then distribute grant money to agencies that request it. Project grants are the most common form of federal grant. Depending on the program requirements, EMS organizations gain access to the funds through a competitive bidding process. Application for a project grant does not guarantee an award, and the amount received by grantees is not predetermined by a formula.316 Although most DHS components possess some programs that support grants,317 FEMA has the majority of programs and funding.318 FEMA Grant Programs Directorate (GPD) The purpose of FEMA GPD is to strategically and effectively administer and manage FEMA grants to ensure critical and measurable results for customers and stakeholders. The mission is to manage federal assistance to measurably improve capability and reduce the risks that the nation faces in times of man- made and natural disasters. The focus of GPD is to provide customer service to all grantees as well as internal and external partners; establish and promote consistent outreach and communication with state, local, and tribal stakeholders; ensure transparency in the grant process; and enhance the nation’s level of preparedness and the public’s capability to prevent, protect, mitigate against, respond to, and recover from all hazards. GPD also holds program management responsibility for the suite of preparedness grants that included, and continue to include, the following goals and objectives: • Review, negotiate, award, and manage the FEMA preparedness grant portfolio. • Provide subject matter expertise in response to regional office and stakeholder inquiries. • Develop grant guidance. • Formulate risk methodology to support grant allocations. • Analyze investments. • Manage budget execution and formulation.

312 FEMA and USFA. “Funding Alternatives for Emergency Medical and Fire Services.” FA-331, April 2012. 313 A block grant does not involve competition. The federal government distributes funds to the states based on an established formula. 314 The AFG Program is discussed in further detail in the Assistance to Firefighters Grant Program Section of this report. 315 Funds issued by a federal agency to a state agency or institution that are then transferred to other state agencies, units of local government, or other eligible groups, per the award eligibility terms. 316 FEMA and USFA. “Funding Alternatives for Emergency Medical and Fire Services.” FA-331, April 2012. 317 DHS supports a wide variety of financial assistance, including post-disaster relief and resilience, preparedness, boating safety, cybersecurity, research, university centers of excellence, and assistance to firefighters. 318 See: http://www.dhs.gov/dhs-financial-assistance (accessed on December 28, 2015).

West Fertilizer Company Final Report January 2016 145 U.S. CHEMICAL SAFETY AND HAZARD INVESTIGATION BOARD

• Provide the driving force for grant management initiatives through the strategic delivery of policy, training, systems, and data analysis.319 The GPD carries out its mission through three divisions, including the GPD Front Office, Grant Operations Division, and Preparedness Grant Division.320 The FEMA grants that pertain to firefighter training and emergency response are discussed in the Preparedness (Non-Disaster) Grants and Assistance to Firefighters Grant Program Sections of this report. Preparedness (Non-Disaster) Grants FEMA provides state and local governments with preparedness program funding in the form of Non- Disaster Grants to enhance the capacity of state and local emergency responders to prevent, respond to, and recover from a WMD terrorism incident involving chemical, biological, radiological, nuclear, and explosive (CBRNE) devices and cyber attacks.321 The Emergency Management Performance Grant (EMPG) Program is a preparedness grant that provides more than $350 million to assist local, tribal, territorial, and state governments in enhancing and sustaining all-hazards emergency management capabilities.322 Either the State Administrative Agency (SAA) or the state’s Emergency Management Agency (EMA) is eligible to apply directly to FEMA for EMPG Program funds on behalf of state and local EMAs.323 The fiscal year (FY 2015) EMPG Program will focus on planning, operations, equipment acquisitions, training, exercises, construction, and renovation to enhance and sustain the all-hazards core capabilities of state, local, tribal, and territorial governments.324 The period of performance for the EMPG Program is 24 months. In FY 2015, the EMPG Program allocated $20,163,325 to the state of Texas.325 Assistance to Firefighters Grant Program Within FEMA, the AFG Program consists of three types of grants326 that support improvements in training, staffing, and safety within fire departments. These grants include the AFG, FP&S grants, and SAFER grants:

319 See: https://www.fema.gov/grant-programs-directorate (accessed on October, 23, 2015). 320 The Preparedness Grant Division includes the Preparedness (Non-Disaster) Grants. 321 See: https://www.fema.gov/preparedness-non-disaster-grants (accessed on October, 22, 2015). 322 See: http://www.dhs.gov/news/2015/07/28/dhs-announces-grant-allocations-fiscal-year-fy-2015-preparedness- grants (accessed on October 22, 2015). 323 See: http://www.fema.gov/media-library-data/1427284579730- 8faafd19a62444a974429c3e12d803fa/FY2015EMPG_FAQ.pdf (accessed on December 28, 2015). 324 See: http://www.fema.gov/media-library-data/1438020444107- 4db58a4f1c24b3bd0962b8327652df5b/FY_2015_EMPG_Fact_Sheet_Allocations.pdf (accessed on October 22, 2015). 325 See: http://www.fema.gov/media-library-data/1438020444107- 4db58a4f1c24b3bd0962b8327652df5b/FY_2015_EMPG_Fact_Sheet_Allocations.pdf (accessed on November 25, 2015) 326 The AFG Program also includes Assistance to Firefighters Fire Station Construction Grants.

West Fertilizer Company Final Report January 2016 146 U.S. CHEMICAL SAFETY AND HAZARD INVESTIGATION BOARD

• AFG. The primary goal of the AFG Program is to meet the firefighting and emergency response needs of fire departments and nonaffiliated EMS organizations. Since 2001, the AFG Program has helped firefighters and other first responders to obtain critically needed equipment, protective gear, emergency vehicles, training, and other resources needed to protect the public and emergency personnel from fire and related hazards.327 AFGs are awarded to fire departments, state fire training academies, and EMS organizations. • SAFER Grants. The SAFER Grants were created to provide funding directly to fire departments and volunteer firefighter interest organizations to help them increase the number of trained frontline firefighters available in their communities. The goal of SAFER is to enhance the local fire departments’ capabilities to comply with staffing, response, and operational standards established by the NFPA (NFPA 1710, NFPA 1720, or both).328 • FP&S Grants. The FP&S Grants are part of the AFG Program and support projects that enhance the safety of the public and firefighters from fire and related hazards.329 The primary goal is to reduce injury and prevent death among high-risk populations. In 2005, Congress reauthorized funding for FP&S Grants and expanded the eligible uses of funds to include firefighter safety research and development.330 In FY 2014, the AFG provided more than $300 million in grant money nationwide; of this $300 million, Texas received approximately $6.5 million. The AFG Program issued 2,243 individual grants nationwide, and of those, only 90 grants were to fire departments for the purpose of training firefighters.331 Moreover, in FY 2014, the AFG Program awarded grant money to 40 firefighting and EMS organizations in Texas to provide aid for much needed resources (Figure 70). Of those 40 Texas organizations, 20 career fire departments, but only 14 VFDs, were awarded funding through the AFG Program. The remaining six organizations include emergency service organizations and one state fire training academy. Notably, an interesting finding is that of the grants awarded in Texas, only one award was specific to training personnel while the majority of the awards were used to fund equipment, PPE, facility modifications, vehicle acquisitions, and wellness and fitness programs.

327 See: http://www.fema.gov/welcome-assistance-firefighters-grant-program (accessed on December 28, 2015). 328 See: http://www.fema.gov/staffing-adequate-fire-emergency-response-grants (accessed on December 28, 2015). 329 See: http://www.fema.gov/welcome-assistance-firefighters-grant-program (accessed on December 28, 2015). 330 See: http://www.fema.gov/fire-prevention-safety-grants (accessed on December 28, 2015). 331 See: http://www.fema.gov/assistance-firefighters-grants-award-year-2014 (accessed on October 21, 2015).

West Fertilizer Company Final Report January 2016 147 U.S. CHEMICAL SAFETY AND HAZARD INVESTIGATION BOARD

Organization City State Program Award Amount Activity Breakdown Award Date Martindale Volunteer Fire Dept. Co. Martindale TX Operations and Safety $46,196.00 Personal Protective Equipment ($48,005) 4/24/2015 Northwest Rural Emergency Medical Services Association, Inc. Tomball TX Operations and Safety $160,572.00 EMS Equipment ($168,600) 4/24/2015 Sulphur Springs Fire Rescue Sulphur Springs TX Operations and Safety $57,143.00 Modify Facilities ($60,000) 4/24/2015 Devine Volunteer Fire and Rescue Department Devine TX Operations and Safety $23,982.00 Equipment ($24,056) 5/8/2015 Farmers Branch Fire Department Farmers Branch TX Operations and Safety $223,773.00 Personal Protective Equipment ($246,150) 5/22/2015 Frankston Volunteer Fire Department Frankston TX Operations and Safety $80,000.00

Equipment ($45,900) || Personal Protective Equipment ($38,100) 5/22/2015 City of Paris Fire Department Paris TX Operations and Safety $11,632.00 Equipment ($12,795) 5/29/2015 Commerce Fire Department Commerce TX Operations and Safety $153,048.00 Personal Protective Equipment ($160,075) 5/29/2015 Texas Engineering Extension Service (TEEX) College Station TX State Fire Training Academy $265,243.00 Equipment ($265,600) 6/19/2015 Hitchcock Volunteer Fire Department Hitchcock TX Operations and Safety $160,667.00 Personal Protective Equipment ($167,500) 7/3/2015 Leander Fire Department Leander TX Operations and Safety $22,719.00 Wellness and Fitness Programs ($6,540) 7/10/2015 San Marcos Fire Department San Marcos TX Regional Request $707,546.00 Equipment ($778,300) 7/10/2015 Troup Volunteer Fire Dept Troup TX Vehicle Acquisition $238,096.00 Vehicle Acquisition ($250,000) 7/10/2015 Bonham Fire Department Bonham TX Vehicle Acquisition $663,713.00 Vehicle Acquisition ($696,898) 7/24/2015 Glenn Heights Fire Department Glenn Heights TX Operations and Safety $78,858.00 Personal Protective Equipment ($82,800) 7/24/2015 Houston Fire Department Houston TX Operations and Safety $915,120.00 Training ($1,008,732) 7/24/2015 Itasca Fire Department Itasca TX Vehicle Acquisition $103,621.00 Vehicle Acquisition ($108,802) 7/24/2015 Burnet County Emergency Services District No. 9 Spicewood TX Operations and Safety $72,000.00 Personal Protective Equipment ($75,600) 7/31/2015 Apple Springs Volunteer Fire Dept Apple Springs TX Operations and Safety $53,143.00 Personal Protective Equipment ($55,800) 8/14/2015 Mic-County Volunteer Fire Department Lockhart TX Regional Request $399,637.00 Equipment ($423,600) 8/14/2015 Orange County Emergency Services District #1 Vidor TX Operations and Safety $173,993.00 Personal Protective Equipment ($191,392) 8/14/2015 Anna Fire Department Anna TX Operations and Safety $28,572.00 Modify Facilities ($30,000) 8/21/2015 Cash Fire Department Assoc. Inc. Greenville TX Operations and Safety $71,760.00 Equipment ($74,355) 8/21/2015 City of Palestine Fire Department Palestine TX Operations and Safety $170,667.00 Personal Protective Equipment ($179,200) 8/21/2015 City of Terrell Fire Department Terrell TX Operations and Safety $246,215.00

Modify Facilities ($65,700) || Personal

Protective Equipment ($139,500) || Wellness and Fitness Programs ($53,325) 8/21/2015 eastex freeway volunteer fire department humble TX Operations and Safety $73,119.00 Equipment ($80,430) 8/21/2015 Elm Mott Volunteer Fire and Rescue Elm Mott TX Operations and Safety $31,429.00 Equipment ($33,000) 8/21/2015 Kilgore Fire Department Kilgore TX Operations and Safety $158,364.00 Personal Protective Equipment ($174,200) 8/21/2015 Comanche Volunteer Fire Department Comanche TX Operations and Safety $116,071.00 Personal Protective Equipment ($121,374) 8/28/2015 Sanger Volunteer Fire Department Sanger TX Operations and Safety $36,364.00 Equipment ($40,000) 8/28/2015 Tarkington Volunteer Fire Department Cleveland TX Operations and Safety $62,858.00 Personal Protective Equipment ($66,000) 8/28/2015 Kingsville Fire Department Kingsville TX Vehicle Acquisition $362,728.00 Vehicle Acquisition ($399,000) 9/4/2015 Muenster Volunteer Fire Department Muenster TX Operations and Safety $78,572.00 Personal Protective Equipment ($82,500) 9/4/2015 Richland Hills Fire Rescue Richland Hills TX Operations and Safety $41,214.00 Equipment ($43,274) 9/4/2015 Stafford, City of Stafford TX Operations and Safety $152,728.00 Personal Protective Equipment ($168,000) 9/4/2015 Quitman Fire & Rescue Quitman TX Operations and Safety $111,429.00 Personal Protective Equipment ($117,000) 9/11/2015 CITY OF WEBSTER WEBSTER TX Operations and Safety $23,620.00 Equipment ($24,800) 9/18/2015 Garland Fire Department Garland TX Operations and Safety $18,730.00 Equipment ($20,400) 9/18/2015 Van Alstyne Fire Department Van Alstyne TX Operations and Safety $33,387.00

Modify Facilities ($23,500) || Equipment ($10,056) 9/18/2015 Centerville Volunteer Fire Dept., Inc Centerville TX Operations and Safety $97,381.00 Personal Protective Equipment ($102,250) 9/25/2015 $6,525,910.00 Assistance to Firefighters Grant Program (AFG) FY 2014 Award Recipients Last Updated: 9/25/2015 - www.fema.gov/firegrants/ TOTAL

Figure 70. Assistance to Firefighter Grant Program Recipients in Texas (Source: FEMA) In FY 2014, the awarded SAFER Grants totaled approximately $11.7 million to five fire departments in Texas to increase the number of trained firefighters; of these five departments, only one was a VFD (Figure 71). Similarly, the awarded FP&S Grants totaled approximately $1.5 million to two organizations in Texas, neither of which were fire departments, to support projects that enhance the safety of the public and firefighters from fire and related hazards (Figure 72).

West Fertilizer Company Final Report January 2016 148 U.S. CHEMICAL SAFETY AND HAZARD INVESTIGATION BOARD

Figure 71. SAFER Grant Award Recipients in Texas (Source: FEMA)

Figure 72. FP&S Grant Recipients in Texas (Source: FEMA) On the basis of the analysis of the FEMA FY 2014 funding allocation to fire departments throughout the nation, it can be concluded that much of the grant monies went toward non training-related support. Given the constraints that many VFDs experience regarding funds to support training, fire departments should express a greater interest in also applying for federal grants for training purposes and not solely for supporting other firefighting-related needs such as equipment. For this reason, FEMA should develop a grant that specifically supports firefighter training needs and cannot be used toward funding other resource needs such as equipment or PPE. DHS FEMA Programs A general understanding of the intricate landscape of federal grant programs also enables a better understanding of many of the DHS and FEMA programs specific to training. This section describes the various components and programs that promote preparedness at a national level. First, the FEMA National Preparedness Directorate (NPD) serves as a mechanism for fostering programs and resources. Second, training programs reside within the National Training and Education Division (NTED). Third, the Homeland Security National Training Program (HSNTP) is positioned to create accessible training and specifically addresses national preparedness gaps. Fourth and fifth, the Center for Domestic Preparedness (CDP) and the Rural Domestic Preparedness Consortium (RDPC) are NTED training

West Fertilizer Company Final Report January 2016 149 U.S. CHEMICAL SAFETY AND HAZARD INVESTIGATION BOARD

partners. Sixth, the USFA role as a leader in firefighter training is reviewed. Each is discussed in detail in the rest of this section. National Preparedness Directorate (NPD) The NPD is an organizational component of FEMA that provides the doctrine, programs, and resources to prepare the nation to prevent, protect, mitigate, respond to, and recover from disasters while minimizing the loss of lives, infrastructure, and property.332 A variety of courses in all-hazards emergency planning and response constitutes a key aspect of building a culture of preparedness and involves training at many levels, including: • State, local, tribal, and territorial elected officials. • Emergency managers. • First responders. • Appropriate whole community members, such as volunteer organizations, Community Emergency Response Teams, Citizen Corps, and bystanders. • Other emergency responders. Through the NPD, FEMA has established and delivered effective training and professional education programs and developed a national certification system for overall emergency management competency and expertise. This work is accomplished by the National Emergency Training Center (NETC), CDP, and other training partners.333 National Training and Education Division (NTED) NTED serves the nation’s first responder community, offering more than 150 courses to help build critical skills that responders need to function effectively in mass consequence events. NTED primarily serves state, local, and tribal entities in 10 professional disciplines, but has expanded to serve the private sector and citizens as well. Instruction is offered at the awareness, performance, and management and planning levels. Emergency responders attend NTED courses to learn how to apply the basic skills of their profession in the context of preparing, preventing, deterring, responding to, and recovering from acts of terrorism and catastrophic events. Training partners or providers that develop and deliver NTED approved training courses include: • CDP. • Counterterrorism Operations Support. • Louisiana State University. • New Mexico Institute of Mining and Technology.

332 See: http://www.fema.gov/national-preparedness-directorate (accessed on December 28, 2015). 333 See: http://www.dhs.gov/topic/plan-and-prepare-disasters (accessed on December 28, 2015).

West Fertilizer Company Final Report January 2016 150 U.S. CHEMICAL SAFETY AND HAZARD INVESTIGATION BOARD

• Texas Engineering Extension Service.334 • Transportation Technology Center, Inc. • University of Hawaii, National Disaster Preparedness Training Center. Other training partners, such as the following, have developed or are developing training courses for NTED: • BCFS Health and Human Services. • Frederick Community College. • International Association of Fire Fighters.335 • Naval Postgraduate School. • RDPC.336 NTED training partners deliver training at no cost to the individual or to the individual’s jurisdiction or agency. In some circumstances, with approval from the SAA state/territory training point of contact, Homeland Security Grant Program (HSGP) funds 337 may be used for overtime and backfill costs for those individuals attending NTED courses. Training providers have a limited supply of training for each state. Occasionally, a state exhausts the available free training. In these cases, NTED has an Excess Delivery Acquisition Program that allows NTED training partners to charge for course delivery when more sessions of a requested class are needed than the grant funds can accommodate. Select training partners potentially could support training firefighters on the hazards associated with FGAN fires, as discussed in further detail. NTED courses include multiple delivery methods, specifically instructor-led (direct), train-the-trainers (indirect), customized (conferences and seminars), and web-based deliveries. Instructor-led courses are offered in residence (i.e., at a training facility) or through mobile programs that deliver courses to state and local jurisdictions that request the training. While the GPD, Grant Operations Division manages, administers, and conducts application budget review, creates the award package, approves, amends and closes out awards, the NPD NTED holds programmatic responsibility for the HSNTP Continuing Training Grants (CTG) Program and also maintains the program management function and responsibilities throughout the life cycle of the awarded grant.338

334 TEEX currently has an 8-hour course delivered in any participating jurisdiction that focuses on training responders to meet the requirements established in NFPA 472, Chapter 4, “Competencies for Awareness Level Personnel,” and the OSHA 29 CFR 1910.120 (q)(6)(i) (a–f) First Responder Awareness Level competencies. This course takes an all-hazards approach to HAZMAT incidents. It provides participants with the knowledge to recognize the HAZMAT, protect themselves, notify others, and secure the scene. As part of a DHS FEMA funded HSNTP Cooperative Agreement, this course is available at no direct cost to state, county, and local government agencies. 335 Section 7.7.3.1 of this report provides additional information about the IAFF. 336 RDPC is discussed in further details in the Rural Domestic Preparedness Consortium Section of this report. 337 HSGP funds can be used to reimburse the state agency or local jurisdiction for delivery of, and attendance to, the course. 338 DHS, HSNTP, CTG Program. “Notice of Funding Opportunity.” DHS-15-NPD-005-000-01.

West Fertilizer Company Final Report January 2016 151 U.S. CHEMICAL SAFETY AND HAZARD INVESTIGATION BOARD

Homeland Security National Training Program, Continuing Training Grants The FY 2015 HSNTP CTG program339 provides funding via cooperative agreements340 to training partners to develop and deliver training to prepare whole communities to prevent, protect against, mitigate, respond to, and recover from acts of terrorism and from natural, man-made, and technological hazards. An objective of the program is to create accessible training solutions to address specific national preparedness gaps across the country. For FY 2015, the total HSNTP funds available under the CTG Program is $11.521 million, to be used for training in the following focus areas: • Cybersecurity. • HAZMAT. • Countering violent extremism. • Rural training. The FY 2015 HSNTP CTG Program is an open and competitive funding opportunity, available to entities with existing programs or demonstrable expertise relevant to the focus areas in the funding opportunity announcement—including state, local, tribal, and territorial entities; nonprofit national associations and organizations; nonprofit higher education institutions; and nonprofits such as community and faith-based organizations. HAZMAT and rural training are two focus areas of interest to this investigation because fire departments with HAZMAT or FGAN facilities in their jurisdiction (or those in rural341 locations) can apply for this grant since they fall under these focus areas. Within the HAZMAT focus area, departments are required to identify current and emerging national gaps in HAZMAT incident planning, response, and recovery as well as the training solutions to address these gaps. The FY 2015 HSNTP CTG Program prescribed the following standards related to HAZMAT training: NFPA standards, including NFPA 472 (Standard for Competence of Responders to Hazardous Materials /Weapons of Mass Destruction Incidents), NFPA 473 (Standard for Competencies for EMS Personnel Responding to Hazardous Materials/Weapons of Mass Destruction Incidents), and 29 CFR 1910.120 (Hazardous Waste Operations and Emergency Response). In addition, Executive Order 13650, “Improving Chemical Facility Safety and Security,” and published reports from the Chemical Facility Safety and Security Working Group have been incorporated. The proposed training should address the following issues:

339 As appropriated by the Department of Homeland Security Appropriations Act, 2015 (Pub. L. 114-4) and authorized by the Implementing Recommendations of the 9/11 Commission Act of 2007 (Pub. L. 110-53) (hereafter the 9/11 Act), and the Homeland Security Act of 2002 (6 U.S.C. § 101 et seq.). 340 A legal instrument of financial assistance between a federal awarding agency or pass-through entity and a non- federal entity that is consistent with 31 U.S.C. 6302–6305. 341 The U.S. Census Bureau defines rural areas as all areas not meeting the following definition of a metropolitan area: Metropolitan statistical area (MSA) must include at least one city with 50,000 or more inhabitants or an urbanized area with at least 50,000 inhabitants and a total MSA population of at least 100,000.

West Fertilizer Company Final Report January 2016 152 U.S. CHEMICAL SAFETY AND HAZARD INVESTIGATION BOARD

• Planning, response and mitigation strategies, defensible critical decision making to save lives and property, and actions for fixed-facility spills and releases. • Increasing knowledge, skills, and abilities to achieve core capabilities of interdiction and disruption, on-scene security and protection, and operational communications and coordination to enhance a jurisdiction’s capability to mitigate and respond to HAZMAT incidents. • Responder health and safety to prepare for, respond to, and recover from HAZMAT incidents by including on-scene health risk assessments and hazard risk analysis, incident safety and health plans, air monitoring plans, PPE selection and use, and safe work practices. Many VFDs similar to the WVFD are situated in rural environments where the funding to support training is limited. The required training objectives for the rural training focus area include HAZMAT, mass fatality planning and response, crisis management for school-based incidents, development of emergency operations plans, railcar safety, agroterrorism and food and animal safety, and media engagement strategies for first responders.342 Center for Domestic Preparedness CDP opened in June 1998 as a training center for the nation’s emergency responders. The CDP mission is to train emergency response providers from state, local, and tribal governments as well as the Federal government, foreign governments, and private entities, as available. CDP training is also available for international, federal, and private sector responders who may participate if space is available on a fee-for- service basis. The scope of training includes preparedness, protection, and response. CDP provides onsite and mobile training at the performance, management, and planning levels while also facilitating the delivery of training by DHS training partners. DHS fully funds CDP training for state, local, and tribal responders. CDP has three distinct facilities that support training, specifically the Chemical, Ordnance, Biological, and Radiological Training Facility (COBRATF), Advanced Responder Training Complex (ARTC), and Noble Training Facility. The CDP COBRATF offers the only program in the nation featuring civilian training exercises in a toxic chemical agent environment, including biological materials. The advanced hands-on training enables responders to effectively respond to real-world incidents involving chemical, biological, explosive, or radiological materials or other HAZMAT. The ARTC provides responders with a realistic training environment to exercise the skills acquired during training. The CDP Noble Training Facility is the nation’s only hospital dedicated solely to preparing the health care, public health, and environmental health communities for mass casualty events related to terrorism or natural disasters. CDP’s federal training partners include agencies such as: • Emergency Management Institute (EMI). • National Fire Academy (NFA). • Federal Law Enforcement Training Centers.

342 DHS HSNTP CTP Program. “Notice of Funding Opportunity (NOFO),” DHS-15-NPD-005-000-01.

West Fertilizer Company Final Report January 2016 153 U.S. CHEMICAL SAFETY AND HAZARD INVESTIGATION BOARD

• Center for Disease Control and Prevention. • Veterans Administration. • DHS Office for Bombing Prevention. • Radiological Emergency Preparedness Program. • Department of Agriculture. • DHS Domestic Nuclear Detection Office. • Health and Human Services Division of Strategic National Stockpile. Rural Domestic Preparedness Consortium (RDPC) Rural emergency responders face unique challenges compared to their urban counterparts, such as limited access to funding for fundamental training. These challenges in providing consistent and high-quality training for first responders were recognized by Congress and DHS, which then established RDPC. Led by the Center for Rural Development, RDPC is a DHS-funded program providing training and resources to rural first responders. RDPC develops and delivers relevant all-hazards training specific to rural environments, and courses are offered both in person and online at no cost. To ensure that training directly reflects the needs of rural emergency responders, RDPC convenes a national rural preparedness summit and completes a biannual national survey of rural stakeholders. Data gathered from these activities are used to determine the type of training needs, level of need, and best delivery methods.343 U.S. Fire Administration (USFA) The USFA is currently an entity within FEMA. The USFA was established by the Federal Fire Prevention and Control Act of 1974. 344 The mission of the USFA is to provide leadership, coordination, and support for the nation’s fire prevention and control, fire training and education, and EMS activities and to prepare first responders and health care leaders to react to all-hazard and terrorism emergencies. One of USFA’s key objectives is to reduce the nation’s loss of life from fire while also reducing property loss and nonfatal injury due to fire.345 The USFA develops and delivers fire prevention and safety education programs in partnership with other federal agencies, the fire and emergency response community, media, and safety interest groups.346 The USFA collaborates with public and private groups to promote and improve fire prevention and life safety through research, testing, and evaluation. The USFA manages many of the federal programs related to firefighting, including the National Fire Incident Reporting System, a dataset and collection of statistical

343 See: https://www.ruraltraining.org/about/overview/ (accessed on October 21, 2015). 344 The U.S. Congress passed P.L. 93-498, the Federal Fire Prevention and Control Act, in 1974, which led to establishment of the USFA and the NFA. See: http://legcounsel.house.gov/Comps/FIREPREV.PDF (accessed on December 28, 2015). 345 See: https://www.fas.org/sgp/crs/homesec/RS20071.pdf (accessed on December 28, 2015). 346 See: http://www.usfa.fema.gov/about/index.html (accessed on December 28, 2015).

West Fertilizer Company Final Report January 2016 154 U.S. CHEMICAL SAFETY AND HAZARD INVESTIGATION BOARD

information relating to fire incidents, public fire education campaign materials, and information on grants and funding. The USFA oversees the NFA at the NETC in Emmitsburg, Maryland. The NFA works to enhance the capability of fire and emergency services and allied professionals to deal more effectively with fire- related emergencies. The NFA offers free training courses and programs on campus, online, and throughout the nation.347 The USFA offers federal funding and grants directly to local career fire departments and VFDs and unaffiliated EMS organizations to help address a variety of equipment, training, and other firefighter and EMS-related needs. The grants are provided through the Fire Act Grants under the FEMA AFG Program, FP&S Grants, and SAFER Grants, which provide grants for hiring, recruiting, and retaining firefighters.348 349 Firefighters often dedicate personal time for training, public education, fundraising, and other nonemergency department-related activities. In addition, they are often members of their local or national firefighter associations. 7.8.2 Texas Firefighting Training Organizations and Programs CSB reviewed the availability of national firefighter training grants and programs. The review revealed that career and volunteer firefighters and fire departments have access to many federally funded training grants and programs throughout the nation. Moreover, CSB reviewed state-level funding and programs available to Texas firefighters and fire departments in an effort to determine how access to HAZMAT and FGAN-specific training can be increased while also improving training standards for FGAN. Select state resources—such as the Texas Commission on Fire Protection (TCFP), Texas Rural Volunteer Fire Department Assistance Program, SFFMA, and Texas A&M Engineering & Extension Services (TEEX) are discussed further. As a result, CSB issues recommendations to some of these state resources, which are identified in Section 11. 7.7.2.2 Texas Commission on Fire Protection (TCFP) The TCFP, a state government agency, is one of many state and local agencies that compose the Texas fire protection community. The commission’s statutory authority and role within this community is to serve Texas fire departments as follows: • Provide training guidelines and assistance to the fire service. • Establish and enforce statewide fire service standards.350

347 See: http://www.usfa.fema.gov/training/nfa/ (accessed on December 28, 2015). 348 See: https://www.fema.gov/welcome-assistance-firefighters-grant-program (accessed on December 28, 2015). 349 The AFG, FP&S Grants, and SAFER Grants are discussed in the Assistance to Firefighters Grant Program Section of this report. 350 See: http://www.tcfp.texas.gov/about/compact.asp (accessed on November 13, 2015).

West Fertilizer Company Final Report January 2016 155 U.S. CHEMICAL SAFETY AND HAZARD INVESTIGATION BOARD

An important TCFP characteristic is its service to regulated organizations, including paid fire departments and those volunteer departments that choose to be voluntarily regulated. The policymaking body of the TCFP is a 13-member board appointed by the governor and confirmed by the Texas Senate. The commissioners adopt policies in accordance with Chapter 419 of the Texas Government Code. Upon adoption by the TCFP, these policies become state administrative laws collected under Part 13 of Title 37 of the Texas Administrative Code (TAC). The TCFP may propose or adopt changes to the TAC. The firefighter advisory committee351 is responsible for reviewing and commenting on the administrative rules that govern the state’s fire service and also assists the TCFP in matters relating to fire protection personnel, volunteer firefighters, fire departments, and VFDs.352 The advisory committee may submit new curricula (or changes to curricula) for study and review before approval by the TCFP. The commission often creates ad hoc advisory committees to assist in creating and updating curricula, validating test questions, and addressing other related matters. Members of the Texas fire service serve voluntarily on these committees.353 The goal of the TCFP compliance program is to ensure the safety of the state’s fire protection personnel by inspecting fire departments and other regulated entities to confirm that they are in compliance with state laws and rules. The compliance inspectors also inspect training records to ensure that fire protection personnel are in compliance with the appropriate certification rules for their disciplines. The commission’s compliance officers travel to every regulated entity at least once every 2 years to inspect fire protection personnel certifications, training records, breathing air test records, protective clothing, and self-contained breathing apparatus. If a fire department is found to be in violation of a state law or TCFP rule, the Compliance Section compels the department to correct the violation immediately or works with it to develop a plan that will lead to compliance.354 The TCFP certification program certifies approximately 32,000 fire protection personnel in Texas. State law requires paid fire protection personnel to be certified by this commission; volunteers and individuals not affiliated with a paid or volunteer department can voluntarily choose to be certified by TCFP. The commission certifies fire protection personnel to multiple levels (basic, intermediate, advanced, and master) in several different disciplines.355 In addition, TCFP certifies training facilities. When fire departments have unmet training needs, TCFP may take a number of actions: • Authorize reimbursement for a local government agency for training program expenses. • Provide staff or educational materials on request to training programs or fire departments.

351 The firefighter advisory committee is created by the TCFP enabling statute, Chapter 419 of the Government Code. The TCFP appoints members. See: http://www.statutes.legis.state.tx.us/Docs/GV/htm/GV.419.htm#419.023 (accessed on December 28, 2015). 352 See: http://www.tcfp.texas.gov/directory/commission_and_committees.asp (accessed on November 3, 2015). 353 See: http://www.tcfp.texas.gov/directory/commission_and_committees.asp (accessed on November 13, 2015). 354 See: http://www.tcfp.texas.gov/about/compact.asp (accessed on October 27, 2015). 355 Including structure fire protection, aircraft rescue fire protection, marine fire protection, fire inspector, fire and arson investigation, HAZMAT technician, pumper driver and operator, fire instructor, fire officer, and head of department.

West Fertilizer Company Final Report January 2016 156 U.S. CHEMICAL SAFETY AND HAZARD INVESTIGATION BOARD

• Establish minimum curriculum requirements for courses in schools operated by state or local governments. • Provide training assistance to fire departments through the following methods:  Purchase and provide training aids to fire departments, temporarily or permanently.  Finance training seminars for fire departments.  Pay instructor fees to teach specialized courses for fire departments that employ fully paid fire protection personnel.356 Although these four elements are cited in the TCFP statute (Section 419.028), the commission is no longer funded for the type of assistance provided by authorizing reimbursements or delivering training. The TCFP funding program that offers this type of training assistance to fire departments was transferred to the Texas A&M Forest Service in 2009.357 TCFP’s Certification Curriculum Manual supplies the curriculum for the training of structural fire suppression personnel, aircraft rescue fire protection personnel, and marine fire protection personnel as well as fire inspectors, fire investigators, HAZMAT technicians, pumper drivers and operators, fire instructors, fire officers, and wildland firefighters. 358 The Certification Curriculum Manual’s Hazardous Materials Awareness chapter was updated in June 2015. This chapter of the manual includes course material on Class 5 oxidizing substances and organic peroxides; this class includes AN.359 The curriculum sets the minimum standards for materials covered in the course; however, instructors decide whether to go into further detail within specific topic areas such as AN. The TCFP may consult and cooperate with a local governmental agency, other governmental agency, university, college, junior college, or other relevant institutions concerning the development of training schools and associated programs of courses of instruction for fire protection personnel, including the preparation or implementation of continuing education or training programs.360 The TCFP has entered into a memorandum of understanding (MOU) with TEEX361 to coordinate each organization’s training responsibilities. In addition, the TCFP has an MOU with the Texas A&M Forest Service to coordinate the provision of training assistance and other assistance to firefighting entities. The Texas A&M Forest Service consists of many programs directed to VFDs to enhance the ability of firefighters to protect themselves and the public from fire-related hazards. One such program within the Texas A&M Forest Service that supports volunteer firefighter training is discussed in more detail in the next section.

356 See: http://www.statutes.legis.state.tx.us/Docs/GV/htm/GV.419.htm (accessed on October 28, 2015), Section 419.028 through Section 419.031. 357 The Rural VFD Assistance Program in the Texas A&M Forest Service is discussed further in Section 7.7.4 of this report. 358 See: http://www.tcfp.texas.gov/manuals/curriculum_manual.asp (accessed on October 28, 2015). 359 See: http://www.tcfp.texas.gov/manuals/curriculum_manual/chapter_6.pdf (accessed on October 28, 2015). 360 Section 419.030. 361 Section 7.7.2.5 discusses TEEX in further detail.

West Fertilizer Company Final Report January 2016 157 U.S. CHEMICAL SAFETY AND HAZARD INVESTIGATION BOARD

  1. 7.2.3 Texas Rural Volunteer Fire Department Assistance Program (HB 2604)

In a January 2015 interim report by the Texas Committee on Homeland Security and Public Safety, Chairman Joe Pickett (D-El Paso) submitted recommendations to, and drafted legislation for consideration by, the House of Representatives, 84th Texas Legislature.362 The committee’s report indicates that of the 40 fire departments that represent the authority with jurisdiction for the 43 FGAN facilities across the state, 27 are VFDs; 7 are a combination of paid and volunteer firefighters; and 6 consist only of paid firefighters. A recommendation that stemmed from this finding encouraged the legislature to approve a rider in the Appropriations Bill for Texas A&M Forest Service that addresses funding in the Rural Volunteer Fire Department (Rural VFD) Assistance Program. The purpose of this funding is to provide training for VFDs across the state that are in a jurisdiction with an FGAN facility.363 The 77th Texas Legislature passed House Bill 2604 in 2001, establishing the Rural VFD Assistance Program.364 The primary goal of the VFD Assistance Programs is to enhance the emergency response capabilities of volunteer and combination fire departments with 20 or fewer paid members.365 The Texas Rural VFD Assistance Program provides funding to rural VFDs for the acquisition of firefighting vehicles, fire and rescue equipment, protective clothing, dry hydrants, computer systems, and firefighter training. This cost-share program is funded by the Texas State Legislature. Beginning on September 1, 2015, the annual grant budget for the program increased to $24.3 million from the previous annual budget of $12.8 million. Cost share assistance for training tuition has increased after changes to the Rural VFD Assistance Program that also took effect on September 1, 2015. The new reimbursement rate is 100 percent of the actual cost of tuition, not to exceed $125 per day up to a maximum of $625 per trainee per school. The annual maximum for training tuition grant assistance per fire department is $12,500.366 The Texas A&M Forest Service conducted a funding meeting for FY 2015 on March 11, 2015, to determine how grants would be awarded. During this meeting, approximately $1.4 million in grants was awarded to Texas VFDs. Two VFDs in McLennan County, Texas, were approved for funding, and one is the WVFD, approved for $8,000 for a training library (Table 10).367 All VFDs that apply for state grants,

362 See: http://www.house.state.tx.us/_media/pdf/committees/reports/83interim/House-Committee-on-Homeland- Security-and-Public-Safety-interim-report.pdf (accessed on October 28, 2015). 363 See: http://www.house.state.tx.us/_media/pdf/committees/reports/83interim/House-Committee-on-Homeland- Security-and-Public-Safety-interim-report.pdf (accessed on October 28, 2015): 22–24. 364 See: http://texasforestservice.tamu.edu/uploadedFiles/FRP/New_- _Local_Capacity_Building/TFS_Assistance_Programs/Historical_Funding_Summaries/2604/HB%202604%20Fund ing%20Meeting%20Approvals%2003_11_15.pdf (accessed on November 13, 2015). 365 See: http://texasforestservice.tamu.edu/content/article.aspx?id=19857 (accessed on October 28, 2015). 366 See: http://texasforestservice.tamu.edu/uploadedFiles/TFSMain/Preparing_for_Wildfires/Fire_Department_Programs/Lo cal_Volunteer_Fire_Department_Programs/Rural_VFD_AssistanceProgram/Special%20Announcement%20-- %20Program%20Changes%20FY16(1).pdf (accessed on October 27, 2015) 367 See: http://texasforestservice.tamu.edu/uploadedFiles/FRP/New- _Local_Capacity_Building/TFS_Assistance_Programs/Historical_Funding_Summaries/2604/HB%202604%20Fund ing%20Meeting%20Approvals%2003_11_15.pdf (accessed on November 16, 2015).

West Fertilizer Company Final Report January 2016 158 U.S. CHEMICAL SAFETY AND HAZARD INVESTIGATION BOARD

including matching federal funds, must certify that they have adopted NIMS. Before the WFC incident in December 2012, the WVFD had requested funds through the Rural VFD Assistance Program for a large brush truck, but the request was not approved. The WVFD requested this funding every year thereafter, although it did not meet the NIMS certification requirement.368 Table 10. Funds Allocated to WVFD through the Rural VFD Assistance Program Date Approved Equipment/Training Category Approved Amount January 2003 Truck Chassis Large $40,000 May 2004 C/S Structural Gear $6,000 September 2008 Wildland Gear $5,700 March 2015 Training Library $8,000

The SFFMA of Texas was instrumental in the creation of House Bill 2604, which annually distributes grant funding through the Texas Forest Service to fire departments in need. Similar to the TCFP, the SFFMA assists many volunteer firefighters and fire departments in obtaining training. 7.7.2.4 State Firefighters’ and Fire Marshals’ Association of Texas (SFFMA) Organized in 1876, the SFFMA is Texas’s oldest and largest fire association serving the fire and emergency service responders of Texas. The SFFMA has the support of more than 1,200 fire departments, 22,000 individual members, 80 industrial fire brigades, and EMS and international departments. The association is active in legislative efforts that affect the fire service in Texas.369 The SFFMA is a fee-based membership organization that offers individual and fire department memberships,370 and has partnered with the National Volunteer Fire Council (NVFC)371 to provide joint benefits to their members. The SFFMA consists of a volunteer firefighter certification program that encourages VFDs to initiate the program in an effort to upgrade training standards. A VFD must be a member of the SFFMA to participate in the certification programs. Through the program, the fire department’s selected

368 See: http://tfsweb.tamu.edu/HistoricalFunding/ (accessed on November 17, 2015). 369 See: http://www.sffma.org/web/SFFMA/About_Us/SFFMA/About.aspx?hkey=84e079d0-75c2-47df-b9e9- 7ae03d5685dd (accessed on October 29, 2015). 370 The fire department membership dues are based on the Federal Census population of the cities and towns that they serve. 371 NVFC is discussed in further detail in Section 7.7.3 of this report.

West Fertilizer Company Final Report January 2016 159 U.S. CHEMICAL SAFETY AND HAZARD INVESTIGATION BOARD

certification coordinator is required to attend a free certification workshop at least once every 2 years. The certification workshop is a requirement to maintain the departments’ participation status. The certification coordinator validates that all training and certifications meet state criteria; it is the coordinator’s responsibility to document the training and ensure that a qualified instructor has conducted the training. To verify that a department holds continual training and correctly maintains its records, the coordinator must submit an annual training summary or progress report.372 The SFFMA Certification Board sets the criteria for the training curriculum; however, it does not develop topic- specific training modules for firefighters and departments. The SFFMA relies on firefighter training schools, approved training providers, or certified training instructors to administer the training. The SFFMA Program allows individual departments and their members to decide how far they will go in the process. The process levels include NFPA 1403, Introductory; NFPA 1001, Firefighter I; NFPA 1001, Firefighter II; and Master certifications.373 Currently, the SFFMA does not have an exclusive program that certifies firefighters on HAZMAT or AN; however, part of the certification for the Firefighter I program includes a section on HAZMAT.374 As part of the minimum standards for firefighter certification, the section designates that trainees recognize the hazard classes and divisions of HAZMAT and WMD375 and identify common examples of materials and primary hazards in each hazard class or division, such as Class 5 oxidizers.376 The SFFMA Texas Industrial Emergency Services Board (TIESB) provides guidance for the Texas Industrial Fire Protection Program. The TIESB works with the Texas Chemical Council and the National Petroleum Refiners Association in reviewing differences among various industries in training needs for all emergencies and loss prevention programs. The TIESB has many objectives, including promoting the development of fire training and loss prevention programs for industrial firefighters or members of the SFFMA and also recommending for each member industry-minimum criteria for maintaining effective fire training, loss prevention, and educational programs.377 Currently, the TIESB has a certification program for industrial HAZMAT teams and emergency response personnel378 that establishes minimum criteria for certification but also provides flexibility so that each facility can structure its training programs to address individual needs. The TIESB has formally adopted NIMS, designating it as the incident management system for all members seeking certification of their training programs.379

372 See: http://www.sffma.org/web/SFFMAPages/Certification/2015/Navigating_Cert_2015_Apr.pdf (accessed on November 2, 2015). 373 See: http://www.sffma.org/WEB/SFFMAPages/Certification/Resources/Certification_FAQ.pdf?WebsiteKey=65a2a6d5- cf92-4d26-8251-b69cdeecaa68&hkey=1509bff9-ad5b-411d-904d-9de79e384a6d (accessed on October 30, 2015). 374 Of the 22 sections in the program, Section 18 covers HAZMAT. 375 NFPA 472, Section 4.2.1: 2, 3. 376 See: http://www.sffma.org/web/SFFMAPages/Certification/2015/Full_Program_2015_02.pdf (accessed on October 29, 2015): 61. 377 See: http://www.sffma.org/web/SFFMA/Divisions/Industrial/SFFMA/TIESB.aspx?hkey=60a9d6ce-7f4f-4d91- b642-d41585bf3597 (accessed on October 30, 2015). 378 Training program certification is for HAZMAT Technician, Specialist, and Incident Command levels. 379 See: http://www.sffma.org/web/SFFMAPages/TIESB/Policy_Docs/TIESB010.pdf (accessed on October 30, 2015).

West Fertilizer Company Final Report January 2016 160 U.S. CHEMICAL SAFETY AND HAZARD INVESTIGATION BOARD

Within Texas, multiple organizations support firefighter standards for training curricula and certification. These organizations work with training partners such as TEEX in the development of course curricula and the implementation of training programs that suit the diverse needs of fire departments. 7.7.2.5 Texas A&M Engineering Extension Services (TEEX) In 1929, the State Firemen’s and Fire Marshals' Association of Texas (SFFMA) selected Texas A&M College as the site for a permanent firefighter training school. In 1931, the Texas Legislature authorized the creation of a Firemen’s training school by passing House Bill No. 921. This bill authorized Texas A&M to create, conduct and maintain a Firemen’s training school. A member of The Texas A&M University System, the Texas A&M Engineering Extension Service (TEEX) has more than 80 years of experience in providing professional services with expertise in national and industrial security, emergency preparedness and response, public infrastructure, occupational safety, economic development, and technology assessment and validation. TEEX employees nearly 1,000 experts in various fields and is able to develop training solutions for emergency responders across the state and nationwide. Funding for Texas agencies and fire departments is available from several sources to support TEEX tuition, fees, and other related expenses. TEEX encourages fire departments to take advantage of federal funding programs such as those in DHS FEMA as well as no-cost training in Texas through the fire extension services, NFA, area schools, and other assistance programs and associations.380 TEEX tailors need-specific services and training at a number of its facilities and also at customer-specified locations worldwide. TEEX has the ability to offer a full-range of services and delivery methods, including: • Course design and development. • Online course delivery. • Hosting services for eLearning courses. • Classroom-based instruction. • Hands-on skills-based instruction. • National certification testing. • Technical assistance and technology validation. • Bilingual training and translation services. TEEX collaborates with resources within The Texas A&M University System to provide a unique blend of research and technical expertise. The TEEX Emergency Services Training Institute’s (ESTI) main training facility is the Brayton Firemen’s Training Field. Adjacent to this facility is Disaster City®, which is comprised of 296 acres in College Station, Texas, making it the world’s largest, most comprehensive campus for first responders. Each year thousands of students participate in ESTI’s hands-on training in firefighting, emergency medical services, hazardous materials, rescue, Incident Command, and

380 See: https://teex.org/Pages/about-us/funding-grants.aspx (accessed on November 6, 2015).

West Fertilizer Company Final Report January 2016 161 U.S. CHEMICAL SAFETY AND HAZARD INVESTIGATION BOARD

specialized programs. ESTI offers over 200 different courses in more than 130 specialty areas to students from across Texas, the United States and around the world.381 In FY15 TEEX/ESTI provided training for some 96,364 students in 3,670 separate classes which accounted for 1.625 million man contact hours. During the course of FY15 training, all 254 Texas Counties were served including 92% of all Texas Communities. TEEX/ESTI also trained students from 81 foreign countries during FY15. TEEX receives General Revenue from the State of Texas to provide outreach or extension training to the States Emergency Responders. In FY15, more than 20,000 responders of the State trained through this program at no cost to them or their department. Through its accreditation with the National Professional Qualification System (NPQS), or ProBoard, TEEX/ESTI is authorized to offer certification training in compliance with National Fire Protection Association (NFPA) standards.382ESTI is currently accredited to provide certifications in 46 individual disciplines. TEEX/ESTI currently leads the nation in the number of ProBoard certifications issued on an annual basis. The certification levels TEEX/ESTI offers include: • NFPA 1001 Fire fighter I & II. • NFPA 1002 Driver/Operator Pumper, Aerial, ARFF, Mobile Water Supply. • NFPA 1003 Airport Firefighter. • NFPA 1006 Rescue Technician - Rope Rescue I, II; Trench Rescue I, II; Confined Space Rescue I, II; Wilderness Rescue I, II; Vehicle & Machinery I, II; Structural Collapse I, II. • NFPA 1021 Fire Office I – IV. • NFPA 1031 Fire Inspector I & II, Plans Examiner I. • NFPA 1041 Fire Instructor I & II. • NFPA 1061 Public Safety Telecommunicator I & II. • NFPA 1081 Fire Brigade - Incipient, Advanced Exterior, Interior Structural, Leader. • NFPA 472 Hazardous Materials - Awareness; Operations Core; Operations Mission Specific: PPE, Product Control, Air Monitoring & Sampling, Response to Illicit Laboratory Incidents; Technician; Technician w/ Tank Car Specialty; Technician w/ Cargo Tank Specialty; Technician w/ Intermodal Tank Specialty; Technician with Flammable Liquids Bulk Storage Specialty; Incident Commander. ESTI supports FEMA’s HSNTP with the delivery of over twenty different courses across the nation with topics that range from tactical level, Wide Area Search and WMD Defensive Operations to simulation- driven incident management courses to executive-level workshops and seminars. In addition, ESTI provides technical assistance, exercise planning expertise and event review and After-Action Report support to organizations across the nation. Throughout the year, TEEX hosts full-scale operational readiness exercises (OREs) that test a team’s entire response capabilities.

381 See: https://teex.org/Pages/about-us/disaster-city.aspx (accessed on December 31, 2015). 382 See: https://teex.org/Pages/Program.aspx?catID=613&courseTitle=Pro%20Board (NPQS) (accessed on December 31, 2015).

West Fertilizer Company Final Report January 2016 162 U.S. CHEMICAL SAFETY AND HAZARD INVESTIGATION BOARD

TEEX/ESTI provides many DHS FEMA funded training programs that can be delivered online, face to face, or in a combination format. One such training program funded by DHS FEMA involves HAZMAT response; this training is geared toward emergency responders and focuses on the special challenges of dealing with WMDs or a terrorist incident, including knowledge of CBRNE events and responses to incidents involving CBRNE materials. The Standardized Awareness Training course focuses on training responders to meet competency requirements established in NFPA 472, Chapter 4, and in OSHA 29 CFR 1910.120. The course takes an all-hazards approach to HAZMAT incidents and gives participants the knowledge needed to recognize the hazardous material, protect themselves, notify others, and secure the scene. Another training program funded by DHS FEMA addresses incident management and response. These courses facilitate the implementation of the all-hazards multidisciplinary team-based approach outlined in the DHS National Response Framework, which is designed to respond to large-scale or expanding incidents, including those involving HAZMAT.383 In addition to the in-person training, ESTI offers a variety of web-based training, such as awareness-level courses and those within the innovative Online Recruit Academy. These interactive courses provide emergency responders with a convenient way to complete knowledge-based training at their own pace. There is an increasing need to provide training to responders who have the potential and will be expected to respond to Industrial Facilities/Industrial Emergencies in their area. There are multitudes of newly- introduced specialized hazards across the United States that First Responder communities have the potential to respond to. The increased potential for incidents to occur in these areas further highlights the need for all response and emergency management personnel be trained on how to properly preplan for, respond to, and mitigate these specialized incidents. Components of this training should address the preplanning, command, safety, operational, logistical, and local resource coordination and public information areas and should focus on assisting local responders in addressing key priorities and a safe outcome for their personnel. These hazards include emergencies that result from drilling and fracking operations, flammable liquid bulk storage facilities, transportation emergencies (pipelines, rail384, trucking, maritime, and air), and warehousing or storage of hazardous chemicals and materials such as FGAN. In light of these potential exposures to the response community, TEEX has developed a course entitled, “Industrial Emergencies for Municipal Based Responders” (IEMBR). This is a two-phased course with the awareness-level information contained in Phase I and the hands-on (firefighting and Hazardous Materials Response) contained in Phase II. TEEX is currently reaching out across the State of Texas and providing Phase I IEMBR training to first responders. Due to the complexity of the Phase II response scenarios and the

383 See: https://teex.org/Pages/Program.aspx?catID=469&courseTitle=Response- Hazardous%20Materials%20and%20Search%20and%20Rescue (accessed on November 6, 2015). 384 TEEX has also developed and is currently delivering a 24-hour Crude by Rail course. TEEX worked in corporation with rail service providers, owning companies and the response community to develop this course. It provides a detailed look at rail car construction, hazards associated with rail car emergencies, response plans, resource management and responder safety.

West Fertilizer Company Final Report January 2016 163 U.S. CHEMICAL SAFETY AND HAZARD INVESTIGATION BOARD

need for realistic training props, all Phase II training is conducted at the TEEX/ESTI Brayton Firemen’s Training Field. Phase II of the IEMBR course is more costly than Phase I due to the flammable liquid fuels, LPG and firefighting foams that are used as part of the training.385 There is a critical need to establish a funding mechanism for First Responders to attend IEMBR Phase II training. 7.7.3 National Membership Firefighter Associations Although several bodies represent the interests of firefighters and emergency responders, the three most prominent labor unions and associations for firefighters in the United States are the International Association of Fire Fighters (IAFF), NVFC, and IAFC. Combined, these three associations have more than a million members across the United States.386 An important aspect of the mission of each association entails providing training information and resources to members. 7.7.3.1 International Association of Fire Fighters (IAFF) The IAFF387 is a labor union that represents career firefighters in the United States and Canada. Established in 1918, the IAFF currently represents a membership of more than 300,000 professional firefighters in more than 3,200 fire departments. The IAFF acts to ensure that adequate resources and tools, including the development and implementation of new training and equipment, are provided to career firefighters and paramedics in all member fire departments. 7.7.3.2 National Volunteer Fire Council (NVFC) The NVFC is a nonprofit association that represents the interests of fire and emergency services at the national level by providing advocacy, information, resources, and programs to support volunteer first responders. The NVFC serves as the voice of the volunteer firefighter in the national arena and supplies tools, resources, programs, and advocacy for first responders nationwide. The NVFC also conducts national advocacy for first responders, including promoting legislation that benefits the fire and emergency medical services. The NVFC offers information, education, and training for volunteer fire and EMS organizations throughout their respective states.388 7.7.3.3 International Association of Fire Chiefs (IAFC) The IAFC represents the leadership of firefighters and emergency responders worldwide.389 With a network of more than 10,000 fire chiefs and emergency personnel, IAFC members include experts in firefighting, EMS, terrorism responses, HAZMAT spills, natural disasters, search and rescue operations, and public safety policy. The IAFC was established in 1873 to provide a forum for fire and emergency

385 See: https://teex.org/Documents/2014-04-firetalk.pdf (accessed December 31, 2015). 386 See: http://www.nfpa.org/research/reports-and-statistics/the-fire-service (accessed on December 28, 2015). 387 See: http://client.prod.iaff.org/#page=AboutUs (accessed on December 28, 2015). 388 NVFC. See: http://www.nvfc.org/ (accessed on December 28, 2015). 389 IAFC. See: http://www.iafc.org/About/?navItemNumber=537 (accessed on December 28, 2015).

West Fertilizer Company Final Report January 2016 164 U.S. CHEMICAL SAFETY AND HAZARD INVESTIGATION BOARD

service leaders to exchange ideas, develop professionally, and identify the latest products and services available to first responders, including career and VFD chiefs.390 8.0 Regulatory Analysis Multiple federal, state, and local agencies regulate FGAN storage and handling, depending on statutory requirements, which can address worker safety, environmental protection, public safety, national security, and transportation. Requirements for reporting bulk quantities of FGAN also vary. CSB reviewed FGAN safety-related requirements in the United States and found differences in how FGAN facilities are identified and regulated. This section includes a discussion of the requirements for FGAN safety and security as well as voluntary efforts by industry, including: • President Obama’s Executive Order (EO) 13650 (Section 8.1). • OSHA Explosives and Blasting Agents standard (Section 8.2). • DHS Chemical Facility Anti-Terrorism Standards (CFATS) (Section 8.3). • OSHA Process Safety Management (PSM) standard (Section 8.4.1). • EPA Risk Management Program rule (Section 8.4.2). • EPA Emergency Planning and Community Right-to-Know Act (EPCRA) regulations (Section 8.5). • National fire protection standards and Texas fire codes (Section 8.6). • Post incident state and local regulatory developments (Section 8.7). • Voluntary industry initiatives (Section 8.8). Each of these sections includes background and analysis. The sections provide supporting information for the CSB recommendations in Section 11, which includes recommendations to regulatory agencies to revise existing standards so that they include FGAN-specific requirements. 8.1 President Obama’s Executive Order 13650 In the aftermath of the West Fertilizer Company (WFC) incident, President Barack Obama issued EO 13650, “Improving Chemical Facility Safety and Security,” on August 1, 2013.391 The EO states that “…measures can be taken by executive departments and agencies with the regulatory authority to further improve chemical facility safety and security in coordination with owners and operators.”392 The EO established the Chemical Facility Safety and Security Working Group, which is co-chaired by the

390 According to its website, the mission of the IAFC is to provide leadership to current and future career, volunteer, fire rescue, and EMS chiefs; chief fire officers; and company officers and managers of emergency service organizations throughout the international community, using vision, information, education, services, and representation to enhance their professionalism and capabilities. See: http://www.iafc.org/About/index.cfm?navItemNumber=537 (accessed on December 28, 2015). 391 Executive Order 13650. “Improving Chemical Facility Safety and Security.” August 1, 2013. 392 Ibid.

West Fertilizer Company Final Report January 2016 165 U.S. CHEMICAL SAFETY AND HAZARD INVESTIGATION BOARD

Secretary of Homeland Security, the EPA Administrator, and the Secretary of Labor.393 Working with multiple governmental agencies, the EO Working Group was tasked with improving operational coordination with state, local, and tribal partners; enhancing federal coordination regarding chemical facility safety and security; improving information collection and sharing; modernizing key policies, regulations, and standards; and identifying best practices.394 One of the group’s first deliverables, issued in August 2013, was the document, “Chemical Advisory: Safe Storage, Handling, and Management of FGAN.”395 The advisory summarized best practices for AN storage, lessons learned from past AN incidents, hazard information, hazard reduction options, emergency planning activities, emergency response operations, and information resources.396 In June 2015, the advisory was reissued as “Chemical Advisory: Safe Storage, Handling, and Management of Solid Ammonium Nitrate Prills.”397 This advisory includes a more detailed and reorganized regulatory information section.398 It has been distributed by government agencies such as EPA and OSHA and by the two U.S. manufacturers of FGAN, CF Industries and EDC. In addition, in June 2014, the EO Working Group published “Actions to Improve Chemical Facility Safety and Security—A Shared Commitment: Report for the President.”399 That report summarized the EO Working Group’s progress, focusing on actions to date, findings and lessons learned, challenges, and high-priority next steps.400 The report includes an aggressive action plan that details specifically how the EO Working Group has begun to, or will, tackle each of its aforementioned tasks.401 8.2 OSHA Explosives and Blasting Agents Standard The 1971 OSHA Explosives and Blasting Agents standard (29 CFR 1910.109) regulates, in part, the storage, use, and transportation of explosives and blasting agents and specifies safety requirements for various grades of AN. The standard was based on two national consensus standards—NFPA402 495 (Code for the Manufacture, Transportation, Storage, and Use of Explosives and Blasting Agents, 1970

393 Ibid. 394 Ibid. 395 See: http://www.ctif.org/sites/default/files/news/files/fed_an_advisory-083013.pdf (accessed on December 28, 2015). 396 Ibid. 397 See: http://www.epa.gov/sites/production/files/2015-06/documents/an_advisory_6-5-15.pdf (accessed on December 28, 2015). 398 Ibid. 399 See: https://www.osha.gov/chemicalexecutiveorder/final_chemical_eo_status_report.pdf (accessed on December 28, 2015). 400 Ibid. 401 See: https://www.osha.gov/chemicalexecutiveorder/ (accessed on December 28, 2015). 402 NFPA codes, standards, and guides are voluntary consensus products that are not enforceable unless adopted into law.

West Fertilizer Company Final Report January 2016 166 U.S. CHEMICAL SAFETY AND HAZARD INVESTIGATION BOARD

Edition), and NFPA 490 (Code for the Storage of Ammonium Nitrate, 1970 Edition).403 The first nine sections of OSHA’s Explosives and Blasting Agents standard, (a) through (h), cover the storage and transportation of explosives and blasting agents. The last two sections, (j) and (k), address small arms ammunition and the manufacture of explosives and pyrotechnics. AN is covered in the middle of the standard, under section (g) when it is used as a blasting agent404 and under section (i) when it is stored in the form of crystals, flakes, grains, or prills, including fertilizer grade, dynamite grade, nitrous oxide grade, technical grade, and other mixtures containing 60 percent or more AN by weight.405 Included in 29 CFR 1910.109(i) are requirements for storage, building construction, ventilation, and fire protection associated with bulk and bagged AN. These requirements cover facilities that store more than 1,000 pounds of AN.406 At the time of the incident, the WFC facility stored FGAN well in excess of 1,000 pounds. The standard includes various requirements for the bulk storage of AN.407 For example, the standard mandates that warehouses have “adequate ventilation or be capable of adequate ventilation in case of fire.”408 Also, storage bins must “be clean and free of materials which may contaminate AN.”409 Bins storing bulk quantities of AN may not be constructed with galvanized iron, copper, lead, or zinc “unless suitably protected,” and wooden bins “protected against impregnation by AN” are permitted.410 The partitions dividing AN storage from other products that would contaminate the AN must be of “tight construction.”411 To avoid potentially dangerous contamination, AN must be in a separate building or must be separated by “approved type firewalls of not less than 1 hour fire-resistance rating from storage of organic chemicals, acids, or other corrosive materials, materials that may require blasting during processing or handling, compressed flammable gases, flammable and combustible materials or other contaminating substances.”412 While CSB found no evidence to suggest that any detonation of AN in the United States has occurred at a facility compliant with OSHA’s 1910.109(i) standard, CSB does find that these requirements do not offer sufficient safeguards concerning the bulk storage of FGAN. This conclusion is evidenced best by the

403 See: https://www.osha.gov/pls/oshaweb/owadisp.show_document?p_table=FEDERAL_REGISTER&p_id=19509 (accessed on December 28, 2015). The NFPA 490 standard went through several updates. The most recent edition was issued in 2002. In 2010, NFPA incorporated NFPA 490 into a more recently developed standard, NFPA 400 (Hazardous Materials Code) (discussed in detail in Section 8.6.1). OSHA, however, has not updated its Explosives and Blasting Agents standard to incorporate the provisions of NFPA 400 because OSHA’s legal authority to adopt consensus standards expired in the mid-1970s. 404 Because it was not pertinent to this investigation, 29 CFR 1910.109(g) is not discussed. 405 29 CFR 1910.109(i)(1)(i)(a). 406 29 CFR 1910.109(i)(2)(i). 407 Because bulk storage of FGAN was primarily at issue at the WFC facility, bagged storage is discussed only briefly for the sake of comparison. 408 29 CFR 1910.109(i)(4)(i)(a). 409 29 CFR 1910.109(i)(4)(ii)(a). 410 Ibid. 411 Ibid. 412 29 CFR 1910.109(i)(5)(i)(a).

West Fertilizer Company Final Report January 2016 167 U.S. CHEMICAL SAFETY AND HAZARD INVESTIGATION BOARD

WFC incident, in which the use of wooden bins (albeit not untreated wooden bins) to store FGAN was allowed under the 1910.109(i) standard. The CSB found that such construction likely facilitated the fire’s spread between storage bins.413 Moreover, the CSB found that even if the wooden bins had been treated (e.g., with coated or clad materials), the incident may have still occurred. This is because, as discussed previously, although coated or clad materials may protect wood against AN impregnation, they are not fire resistant and will still burn. Accordingly, CSB issued public comments on March 31, 2014 when OSHA released a Request for Information (RFI) to CSB and other stakeholders on its Explosives and Blasting Agents standard.414 The comments made by CSB pertained in part to the weakness of the provisions in 29 CFR 1910.109(i), particularly with respect to the bulk storage of FGAN.415 Specifically, CSB expressed concern that, because of certain gaps in 1910.109(i), users are left to decide appropriate safety measures without proper instruction.416 For example, 1910.109(i) permits the use of wooden bins “protected against impregnation of AN” without defining the word “impregnation.”417 Furthermore, even if the word had been defined, CSB noted that the use of wooden bins is not recommended in other countries, such as the United Kingdom (U.K.), which recommend the use of concrete for bulk AN storage.418 Moreover, CSB noted in its RFI comments that 1910.109(i) does not provide sufficient fire protection measures with respect to the storage of bulk quantities of FGAN because it requires sprinklers only for bagged AN in amounts exceeding 2,500 tons.419 CSB concluded that the requirement for sprinklers (or other fire suppression methods) as well as fire detection equipment likely would have helped minimize the severity of the impact of the WFC fire and explosion on the facility and on the surrounding community.420 In addition, CSB commented that the title of the standard, “Explosives and Blasting Agents,” should be revised so that it is clear that FGAN not used as a blasting agent or explosive is also covered under the standard.421 As currently titled, the name of the standard might mislead readers to believe that the standard applies only to the explosives industry. Accordingly, CSB recommended that the title be revised to clearly indicate that the standard also applies to the fertilizer industry. Similarly, CSB noted that no scope describing the purpose and application of the standard is listed at the beginning of the standard.422 Rather, the scope of 29 CFR 1910.109(i) that applies to FGAN appears in the middle of the standard.

413 It should be noted, however, that 29 CFR 1910.109(i) did prohibit the configuration and contents of the seed room adjacent to the AN bin. 414 On December 9, 2013, OSHA issued an RFI on 17 issues regarding revision to the agency’s regulatory standards. CSB commented on 15 of the 17 issues in a public comment dated March 31, 2014. The CSB comments are posted on the OSHA website; see: http://www.csb.gov/assets/1/16/CSB_RFIcomments.pdf (accessed on December 28, 2015). 415 See: http://www.csb.gov/assets/1/16/CSB_RFIcomments.pdf (accessed on December 28, 2015). 416 Ibid. 417 Ibid. 418 Ibid. 419 Ibid. See: 29 CFR 1910.109(i)(7)(i). 420 See: http://www.csb.gov/assets/1/16/CSB_RFIcomments.pdf (accessed on December 28, 2015). 421 Ibid. 422 Ibid.

West Fertilizer Company Final Report January 2016 168 U.S. CHEMICAL SAFETY AND HAZARD INVESTIGATION BOARD

CSB recommended changing this organization so that the scope is specified early in the document and is easy to locate. CSB concluded that the implementation of such recommendations regarding the standard’s title and scope would likely make the standard easier to understand. In addition to providing comments in response to the OSHA RFI, CSB reviewed guidance documents on FGAN from government and industry sources, finding that the only pre-WFC incident reference to the OSHA standard was in an EPA Chemical Safety Alert, “Explosion Hazard from AN,” from December 1997.423 In a letter to EPA, The Fertilizer Institute (TFI), a major trade association composed of fertilizer industry representatives, contended that the reference was inaccurate and that EPA therefore should remove it from its alert.424 Specifically, TFI said that the standard “was not applicable to facilities handling AN, unless the facility also handles an explosive or blasting agent.”425 This assertion, however, is incorrect; no part of the standard supports such a reading. As previously mentioned, 29 CFR 1910.109(i) clearly states that it applies to “. . . the storage of AN in the form of . . . prills including fertilizer grade . . .”426 Nonetheless, CSB finds that additional and well publicized guidance is needed to explain the applicability and provisions of the standard. Fertilizer industry representatives reported to the Government Accountability Office (GAO) that it was not well known that 1910.109(i) applies to FGAN.427 While conducting interviews with WFC management and employees, CSB found that WFC personnel knew little about the pertinent section. During these interviews, CSB learned that OSHA conducted its last inspection of the WFC plant428 in 1985, when the facility was cited for various violations concerning anhydrous ammonia, respiratory protection, and recordkeeping. CSB found no evidence that OSHA cited the WFC for violating any requirement of 1910.109(i) before the April 2013 fire and explosion. It is unknown whether OSHA inspected the facility against this section of the standard. CSB found that, in addition to WFC personnel, others who would reasonably be expected to know about 29 CFR 1910.109(i) might not have had such knowledge. After the current owners acquired the facility in 2004, third-party safety consultants who visited the facility never referenced 1910.109(i) in their final inspection reports. In fact, in reviewing documentation provided by the WFC, CSB identified only one mention of 1910.109(i)—in a Safety Data Sheet (SDS) provided by one of the WFC’s FGAN suppliers, CF Industries, which the WFC received in 2012. The GAO confirmed this observation, noting in its May

423 See: http://nepis.epa.gov/Exe/ZyPDF.cgi/P100BH59.PDF?Dockey=P100BH59.PDF (accessed on December 28, 2015). 424 The Fertilizer Institute. “Fertilizer Grade Ammonium Nitrate: Properties and Recommended Methods for Packaging, Handling, Transportation, Storage and Use.” 425 Leason, Chris S., counsel to TFI. Letter to Tawai-David Chung, EPA OSWER, CEPPO, June 27, 1997. At the request of CSB, EPA conducted a search to find its final signed response to TFI’s letter. Because of the age of the document, it would only exist in paper form; however, EPA no longer has paper files from that time frame. Thus, EPA’s response to this letter is unknown. 426 29 CFR 1910.109(i)(1)(i)(a). 427 GAO. “Chemical Safety: Actions Needed to Improve Federal Oversight of Facilities with Ammonium Nitrate.” Washington, DC: GAO, May 2014. 428 Certain structures of the WFC plant had not yet been built at the time of the 1985 OSHA inspection.

West Fertilizer Company Final Report January 2016 169 U.S. CHEMICAL SAFETY AND HAZARD INVESTIGATION BOARD

2014 report that it reviewed four SDSs from producers of solid FGAN fertilizer and only one mentioned the pertinent section of the OSHA standard.429 CSB notes as a concern the fact that the fertilizer industry, as recently as 2014, reported that personnel exhibited little recognition of the applicability of 1910.109(i) to FGAN.430 With respect to enforcement, CSB found very little history of OSHA using 29 CFR 1910.109(i) to cite fertilizer facilities. Table 11 shows OSHA’s record of 1910.109(i) citations and also the citation that OSHA issued against the WFC by Standard Industrial Classification (SIC)431 code. Table 11. OSHA 29 CFR 1910.109(i) Citation History No. Facility Inspection Year Standard Industrial Classification 1. Coshocton Farm Bureau (Coshocton, OH) 1974 5083: Farm and Garden Machinery 2. Smith-Douglass Chemical Div. Bo. (Clayton, DE) 1975 5191: Farm Supplies 3. Jr. Simplot Co. (Bartley, NE) 1975 2875: Fertilizers, Mixing Only 4. Farmers Union Cooperative Oil (Flandreau, SD) 1975 5541: Gasoline Service Stations 5. Old Fox Chemical Co, Inc. (East Providence, RI) 1976 2875: Fertilizers, Mixing Only 6. Drake Chemical Inc. (Lock Haven, PA) 1976 2865: Cyclic Crudes and Intermediates 7. IMC Chemical Group Inc. Trojan (New Tripoli, PA) 1976 2892: Explosives 8. Atlas Powder Co. Kinepak (Alvarado, TX) 1977 2892: Explosives 9. Jacklin-Plant Food Center (Post Falls, ID) 1977 5191: Farm Supplies

  1. Genstar Chemical Inc.

(Presque Isle, ME) 1978 2873: Nitrogenous Fertilizers

  1. Nipak Energy Corp.

(Krum, TX) 1979 2892: Explosives

  1. Iuka Coop Exchange

(Iuka, KS) 1979 5153: Grain and Field Beans

  1. Beaver Explosives Inc.

(New Castle, PA) 1980 2892: Explosives

  1. Independent Explosives Co. of

Pennsylvania (Pittston Township, PA) 1987 2892: Explosives

429 GAO. “Chemical Safety: Actions Needed to Improve Federal Oversight of Facilities with Ammonium Nitrate.” Washington, DC: GAO, May 2014. 430 Ibid. 431 SIC is a system for classifying industries according to industry-specific four-digit codes.

West Fertilizer Company Final Report January 2016 170 U.S. CHEMICAL SAFETY AND HAZARD INVESTIGATION BOARD

(Parrish, AL) 1990 2892: Explosives

(Kittanning, PA) 1994 2892: Explosives

(Orlando, FL) 1997 2875: Fertilizers, Mixing Only

(Good Springs-Tremont, PA) 1998 1629: Heavy Construction, Nec.

(Mount Carmel, PA) 1999 2892: Explosives

(West, TX) 2013 5191: Farm Supplies As shown in Table 11, 19 inspections resulted in citations, excluding the citation against the WFC. The SIC code for 10 of these citations are clearly nonfarm, addressing mostly explosives; the nine remaining citations are related to farm supplies. It is important to note, however, that these data reflect citations only, not inspections. That is, although the facilities in Table 11 were inspected against, and cited for violations of, 1910.109(i), they do not represent all inspections conducted by OSHA against that section of the standard. It is impossible to determine whether OSHA inspected any other facilities for compliance, but did not cite them. CSB found no evidence of citations from 1999 to 2013. The OSHA 29 CFR 1910.109(i) citation history in Table 11 is also similar to that of more recent OSHA enforcement data from 2005 to 2013. These data show that no other facility with the same North American Industry Classification System (NAICS)432 code as the WFC (NAICS Code 424910) received a citation for violating 1910.109(i). The GAO May 2014 report similarly concluded that OSHA rarely issued citations for violations of the standard’s requirements for FGAN storage at fertilizer facilities.433 GAO found that “a citation for a violation of [OSHA’s] AN storage regulations was issued as a result of an inspection of a fertilizer facility only once before the explosion in West, Texas.”434 After the WFC explosion, OSHA issued 24 citations to the WFC on October 9, 2013, including nine citations for serious violations of 29 CFR 1910.109(i).435 These violations included lack of adequate ventilation, absence of fire-resistive construction, and improper storage and bin pile heights.436 The agency also cited the WFC for not ensuring that the wooden bins it used to store FGAN were treated to prevent FGAN impregnation.437 OSHA and the WFC ultimately settled, with the WFC agreeing to pay

432 NAICS is the standard used by Federal statistical agencies in classifying business establishments for the purpose of collecting, analyzing, and publishing statistical data related to the U.S. business economy. 433 GAO. “Chemical Safety: Actions Needed to Improve Federal Oversight of Facilities with Ammonium Nitrate.” Washington, DC: GAO, May 2014. 434 Ibid. 435 OSHA. “Citation and Notification of Penalty to Adair Grain,” October 9, 2013. 436 Ibid. 437 Ibid.

West Fertilizer Company Final Report January 2016 171 U.S. CHEMICAL SAFETY AND HAZARD INVESTIGATION BOARD

penalties without admitting guilt about violating the standards under which it was cited, including 1910.109(i). There is evidence that the WFC owners made efforts to comply with regulations when notified of noncompliance. When the WFC owners acquired the facility in 2004, state and federal regulators found them to be noncompliant with environmental, product quality, and transportation regulations—issues that the owners promptly corrected. For example, Federal EPA inspectors cited the WFC for not refiling its Risk Management Plan (RMP) registration in 2004.438 This citation prompted the WFC to hire an insurance company to develop a comprehensive RMP for the safe storage of its anhydrous ammonia.439 Also, Texas Commission on Environmental Quality (TCEQ) inspectors issued a citation to the facility in 2006 for not having an air permit for anhydrous ammonia.440 The WFC subsequently developed maintenance and inspection programs to prevent anhydrous ammonia releases. As a result of these inspections and citations, the WFC took appropriate corrective actions. The importance of regulatory awareness and notification, therefore, cannot be overemphasized. 8.2.1 OSHA Issuance of Guidance on Explosives and Blasting Agents Standard In December 2014, the OSHA Directorate of Enforcement Programs issued investigatory and citation guidance to OSHA enforcement personnel on elements of 29 CFR 1910.109. The nine-page guidance document provides additional clarification of the scope of 1910.109(i) and its application to facilities that store FGAN. This document includes specific compliance guidance for the majority of standard provisions and describes conditions that would be considered in or out of compliance. This guidance further clarifies the application of the standard to facilities storing FGAN and provides a list of NAICS industry codes for facilities most likely to manufacture, use, store, handle, or possess FGAN. The list of NAICS codes includes facilities such as the WFC plant and states that particular attention to AN hazards is needed when inspecting these facilities. The guidance also clarifies the standard’s definition of “adequate ventilation” and includes the types of ventilation likely to be unacceptable under the regulations as well as a ventilation rate calculation to assess compliance. Furthermore, the guidance document provides additional clarification on the subject of wood protection against FGAN impregnation. As discussed previously, 1910.109(i) does not specifically define compliant approaches for the treatment of wood to protect against FGAN impregnation. The standard prohibits untreated wood bin construction for FGAN storage. Although OSHA does not recommend the use of treated wood bins, wood with impermeable coating and claddings (such as two-part epoxy coatings, steel sheet cladding, or sodium silicate) are considered acceptable means for protecting wood against FGAN impregnation. OSHA provides additional guidance for varying types of wood construction that might be encountered during field inspections, including citable conditions such as improperly treated wood and

438 EPA. “Enforcement Case Report to West Chemical & Fertilizer Company,” August 14, 2006. 439 Triangle Insurance Company. Anhydrous Ammonia Supplement for WFC, 2006. 440 TCEQ. “TCEQ Enforcement Referral to West Chemical & Fertilizer,” June 21, 2006.

West Fertilizer Company Final Report January 2016 172 U.S. CHEMICAL SAFETY AND HAZARD INVESTIGATION BOARD

treated wood that has not been maintained to protect the coating integrity. The guidance also addresses pile heights for clumping and caking conditions and fire prevention. The 2014 guidance document for 1910.109(i) addressed some of the issues with vague wording that CSB raised in the RFI comments. Some of the requirements listed under the standard, however, do not provide sufficient safeguards to a facility owner storing bulk quantities of FGAN. In the case of the WFC incident, the wood-constructed bins were made of combustible materials and likely facilitated the spread of a fire between storage bins. According to OSHA, AN impregnation of porous combustible materials, such as wood, can accelerate combustion in the event of a structural fire and increase the explosion risk.441 OSHA permits the use of wood bins and wood construction only if the wood is protected against impregnation. Although coated or clad materials can protect against AN impregnation, they are not fire resistant and will still burn, contributing to the generation of heat during a fire. CSB determined that the wood-constructed bins likely contaminated the AN, ultimately leading to the detonation by increasing AN energy and sensitivity (discussed in Section 4.2.1). Completely eliminating wood and other combustibles as materials for constructing FGAN bins and storage facilities greatly reduces the possibility of contaminating FGAN during a fire or smoldering event. Although OSHA enforcement guidance and other efforts have provided greater clarity on how 1910.109(i) applies to FGAN facilities, OSHA still needs to revise and update the standard to incorporate the most recent provisions in NFPA 400 (2016 Edition) that address the safe storage of FGAN. OSHA cannot enforce some of the regulations in the current 1910.109(i) because they contain requirements reserved for the authority having jurisdiction, such as the municipal or state code official for occupancy permits. Moreover, OSHA cannot cite the following requirements in the standard: • 29 CFR 1910.109(i)(2)(ii): Approval of large quantity storage shall be subject to due consideration of the fire and explosion hazards, including exposure to toxic vapors from burning or decomposing ammonium nitrate. • 29 CFR 1910.109(i)(2)(iii)(e): The continued use of an existing storage building or structure not in strict conformity with this paragraph may be approved in cases where such continued use will not constitute a hazard to life. Because the current version of 1910.109(i) has limited enforcement in some areas—and because NFPA 400 (2016 Edition) (discussed in Section 8.6.1.1) includes updated provisions, some in response to the WFC incident, for increasing the safety of AN storage facilities—OSHA should update 1910.109(i) to include requirements similar to the provisions in NFPA 400 (2016 Edition). It also should revise the rules that currently are enforceable only by municipal or state officials.

441 OSHA enforcement directive on 1910.109(i).

West Fertilizer Company Final Report January 2016 173 U.S. CHEMICAL SAFETY AND HAZARD INVESTIGATION BOARD

  1. 2.2 Need for an Emphasis Program

Unfortunately, only after the WFC incident was more attention focused on the hazards of FGAN and the role of applicable regulations. Since the explosion and issuance of the EO, OSHA has worked to increase awareness of FGAN and the scope of 29 CFR 1910.109(i) through the joint agency advisory on safe storage of FGAN, the letter to the fertilizer industry, and the guidance document for compliance officers to assist in enforcing the 1910.109 standard for FGAN facilities. However, enforcement guidance does not provide the resources needed by OSHA to increase the frequency of inspections, although such guidance may help ensure that 1910.109(i) is applied appropriately when OSHA compliance officers happen to inspect facilities that fall under the rule. A more realistic and immediate approach to confirm that FGAN facilities are complying with the standard would be for OSHA to launch a regional emphasis program (e.g., in Regions IV, VI, and VII442) where these types of facilities are more common. A regional emphasis program would include a certain number of annual inspections per year, which would facilitate bringing FGAN facility operators into compliance with both regulatory and industry standards and would reduce the potential for a future event similar to the WFC incident. Imposing stricter requirements on AN storage and handling could take several years before enactment into federal regulations. OSHA has initiated several national, regional, and local emphasis programs targeted at specific industries or located in specific geographical areas to help prevent hazards. Such emphasis programs have successfully focused inspection and enforcement efforts on specific industries. A 1910.109(i) emphasis program can include NFPA 400 (2016 Edition) as a guidance document for compliance officers to support recognition of hazardous conditions or issuance of violations when found. It would also prompt improvement of safe FGAN storage and handling practices through increased awareness and would allow OSHA to collect information and data that could support future revisions to current regulations on FGAN. 8.3 Chemical Facility Anti-Terrorism Standards (CFATS) DHS promulgated the CFATS in 2007 to address security issues at high-risk chemical facilities, including those that store certain quantities of FGAN. The rule establishes risk-based performance standards for chemical facility security and requires facilities to prepare vulnerability assessments and security plans to protect the public from a breach of security or an intentional release. Under CFATS, DHS collects information from facilities that possess designated quantities of chemicals of interest (COIs).443 In creating the COI list, DHS referenced other established lists that regulate

442 These regions include the following states: Alabama, Florida, Georgia, North Carolina, South Carolina, Tennessee, Mississippi, Kentucky, Nebraska, Kansas, Missouri, Iowa, Texas, Oklahoma, Arkansas, Louisiana, and New Mexico. 443 CFATS § 27.210(a)(1)(i).

West Fertilizer Company Final Report January 2016 174 U.S. CHEMICAL SAFETY AND HAZARD INVESTIGATION BOARD

chemicals—including the list of chemicals covered under the EPA Risk Management Program, the Chemical Weapons Convention, and DOT—and a list of chemicals with known inhalation hazards. The COI list includes 322 chemicals and also screening threshold quantities for each chemical as it relates to each of the three defined security hazards (release, theft, and sabotage). Chemical facilities that meet the COI criteria listed in Appendix A of the CFATS rule must complete and electronically submit a Chemical Security Assessment Tool (CSAT) Top-Screen form to DHS. Using the information collected from facility Top-Screen information, DHS assigns a preliminary risk-based tier— from the highest (tier 1) to the lowest “high-risk” level (tier 4) and the “not high-risk” level (tiered out)— based on a basic assessment of the potential consequences in association with the chemical holdings at each facility.444 Once a preliminary tier is assigned, each facility in tiers 1 through 4 must submit a CSAT Security Vulnerability Assessment to DHS, and DHS uses that assessment to make a final determination of the facility’s assessed level of risk. If DHS retains the facility in one of the four high-risk tiers, the facility must submit a site security plan. DHS reviews the plan, conducts an onsite inspection of the facility, and approves the plan if it is deemed adequate relative to the risks inherent in the facility, its chemical holdings, and potential consequences of a security breach. Since publication of the CFATS rule, DHS has received more than 50,000 Top-Screen forms submitted by chemical facilities. As of September 2015, DHS covers 3,182 high-risk facilities nationwide, and 2,607 of those sites have undergone onsite authorization inspections. 8.3.1 AN Screening Thresholds FGAN is listed in CFATS Appendix A as a DHS COI. A facility reports to DHS based on possession of AN under three conditions:

  1. If a facility possesses 5,000 pounds or more of FGAN with more than 0.2 percent combustible

substances, including any organic substance calculated as carbon, to the exclusion of any other added substance in bulk storage, the facility must report. Facilities meeting this threshold must also submit information to DHS on quantity and on method of storage or packaging.

  1. If a facility possesses 400 pounds or more of FGAN with more than 0.2 percent combustible

substances, including any organic substance calculated as carbon, to the exclusion of any other added substance in transportation packaging, the facility must report.

  1. If a facility possesses 2,000 pounds or more of solid FGAN with a nitrogen concentration of 23

percent or higher in transportation packaging, the facility must report.

CSB requested and reviewed CFATS data from all facilities in the United States that submitted information to DHS for storage of FGAN as of March 2014. According to the DHS data, 1,351 facilities in the United States store AN in quantities that exceed the screening thresholds. The majority of those

444 When determining whether a facility is high risk, DHS primarily focuses on the potential consequences associated with a successful terrorist attack on the facility (including the use of stolen or diverted materials in a separate attack offsite). A threat factor also is incorporated into the risk assessment for facilities with release hazards.

West Fertilizer Company Final Report January 2016 175 U.S. CHEMICAL SAFETY AND HAZARD INVESTIGATION BOARD

facilities store FGAN for agricultural uses (Figure 73). Based on the NAICS codes submitted with Top- Screen information, 46 percent of the facilities that report to DHS stock FGAN for agricultural purposes such as farm merchandising and wholesale or crop preparation. An additional 6 percent store FGAN for fertilizer mixing.

Figure 73. Percentage of AN Storage Facilities by Industry (Source: DHS) In 2008, DHS filed a reporting extension to agricultural facilities meeting screening thresholds of FGAN for farmers and agricultural end users of FGAN, such as the preparation and application of crops, feed, land, or livestock.445 However, this extension does not apply to chemical distribution facilities or to commercial chemical application services, such as the WFC. At the time of the April 2013 explosion, the WFC possessed an estimated maximum of 120,000 pounds of FGAN, about 60 times the screening threshold of 2,000 pounds, but did not submit Top-Screen information to DHS as required under the CFATS. Consequently, DHS was unaware that the WFC possessed FGAN until the 2013 explosion. After the incident, the WFC retroactively submitted a Top Screen to DHS upon notification that it was not compliant with the rule, and DHS did not issue a citation to the WFC for originally failing to submit the form. If the WFC had complied with the CFATS, a CFATS inspection or assistance visit might have noted the storage conditions at the WFC facility and prompted change. In addition, DHS engagement

445 73 Federal Register 1640.

West Fertilizer Company Final Report January 2016 176 U.S. CHEMICAL SAFETY AND HAZARD INVESTIGATION BOARD

with facility management might have prompted greater engagement by local law enforcement, which in turn might have supported greater involvement by other community emergency services. 8.4 Safety Management Programs Following a number of major chemical accidents in the United States and abroad in the 1970s and 1980s, Congress amended the Clean Air Act (CAA) in 1990 to require both OSHA and EPA to publish new regulations to help prevent similar accidents. Through Section 304 of the CAA Amendments, Congress directed the Secretary of Labor, in coordination with the EPA Administrator, to promulgate, pursuant to the Occupational Safety and Health Act of 1970, a chemical process safety standard to prevent accidental releases of chemicals that could pose a threat to employees.446 Also, through CAA Amendments Section 112(r), Congress required EPA to publish regulations and guidance for chemical accident prevention at facilities using substances that posed the greatest risk of harm from accidental releases.447 The following sections focus on the intertwined regulations that OSHA and EPA developed – the OSHA Process Safety Management of Highly Hazardous Chemicals standard and the EPA Risk Management Program rule. 8.4.1 OSHA Process Safety Management Standard OSHA’s Process Safety Management of Highly Hazardous Chemicals standard (29 CFR 1910.119) (known as the PSM standard) became effective in May 1992.448 The standard contains requirements for preventing or minimizing the consequences of catastrophic releases of toxic, reactive, flammable, or explosive chemicals.449 It includes the following 14 elements: 1. Employee participation. 2. Process safety information. 3. Process hazard analysis. 4. Operating procedures. 5. Training. 6. Contractors. 7. Pre-startup safety review. 8. Mechanical integrity. 9. Hot work permits. 10. Management of change. 11. Incident investigation. 12. Emergency planning and response. 13. Compliance audits.

446 See: https://www.osha.gov/Publications/osha3132.html (accessed December 28, 2013). 447 See: http://www.epa.gov/sites/production/files/2013-10/documents/caa112_rmp_factsheet.pdf (accessed December 28, 2015). 448 OSHA. “Process Safety Management.” OSHA 3132, 2000. 449 29 CFR 1910.119.

West Fertilizer Company Final Report January 2016 177 U.S. CHEMICAL SAFETY AND HAZARD INVESTIGATION BOARD

Trade secrets.450 The PSM standard states that it applies, in part, to “a process which involves a chemical at or above the specified threshold quantities listed in Appendix A [List of Highly Hazardous Chemicals, Toxics and Reactives] to this section.”451 Notably, FGAN is not on this list. In deciding which chemicals to regulate under the PSM standard, OSHA reviewed potential “highly reactive and explosive substances,” as required by Section 304(b) of the CAA Amendments.452 OSHA considered information drawn from multiple sources, including EPA, DOT, World Bank, NFPA, the Health and Safety Commission of the U.K., and the states of Delaware and New Jersey.453 With respect to reactives, OSHA chose to include only those chemicals with the two highest (i.e., most dangerous) reactivity ratings under NFPA 490 because of the significant risk that they posed to workers.454 These chemicals had reactivity ratings of 3 or 4.455 FGAN, however, was left off the PSM list, despite having a reactivity rating of 3.456 Although the agency did consider adding FGAN to the PSM list in the late 1990s, this effort failed due to “resource constraints and other priorities.”457 Thus, FGAN has yet to be regulated under the PSM standard. Anhydrous ammonia, on the other hand, is on the List of Highly Hazardous Chemicals, Toxics and Reactives, with a threshold quantity of 10,000 pounds. CSB found that, at the time of the incident, the WFC was storing the equivalent of 34,000 pounds of anhydrous ammonia, more than three times the threshold quantity that triggers PSM coverage. CSB also discovered that the WFC had previously stored 54,000 pounds of anhydrous ammonia in 2006 and 2011. Given these facts, the WFC should have complied with the PSM standard because the company stored anhydrous ammonia, at least in 2006, 2011, and 2013, in quantities that exceeded its threshold quantity. However, CSB learned that the PSM standard did not apply to the WFC at the time of the incident because the facility qualified under OSHA’s interpretation of the standard’s retail facilities exemption. At the time of the incident, a facility qualified under the retail facilities exemption if the following conditions were met: (1) the facility contained a highly hazardous chemical in a quantity that met or exceeded the threshold quantity for the chemical; (2) the facility used a process458 covered by the PSM

450 Ibid. 451 29 CFR 1910.119(a)(1)(i). 452 CONSAD OSHA Report, 1988. 453 55 Federal Register 29150. 454 CONSAD OSHA Report, 1988. 455 Ibid. 456 Federal OSHA in discussion with CSB, May 14, 2015. 457 See: https://www.osha.gov/pls/oshaweb/owadisp.show_document?p_table=FEDERAL_REGISTER&p_id=16946 (accessed December 28, 2015). 458 The PSM standard defines “process” as any activity involving a highly hazardous chemical, including any use, storage, manufacturing, handling, or onsite movement of such chemicals (or any combination of these activities). It also states that, for purposes of this definition, any group of vessels that are interconnected—and separate vessels

West Fertilizer Company Final Report January 2016 178 U.S. CHEMICAL SAFETY AND HAZARD INVESTIGATION BOARD

standard; and (3) more than 50 percent of the facility’s income was derived from direct end users.459 The WFC facility met all three conditions for its storage of anhydrous ammonia. It stored anhydrous ammonia, a highly hazardous chemical, in quantities that exceeded its threshold quantity. Also, the facility used a process because it stored the anhydrous ammonia, and storage meets the PSM standard definition of a “process.” Because the WFC primarily sold its products, including anhydrous ammonia, to farmers (i.e., direct end users), the company met the third condition as well. Thus, the WFC qualified under the PSM standard’s retail facilities exemption and was not required to comply with the standard. If the PSM standard had applied to the WFC for its storage of anhydrous ammonia however, the WFC would have been required to conduct a process hazard analysis (PHA). A PHA must address the following: • Hazards of the process. • Identification of any previous incident that had a potential for catastrophic consequences in the workplace. • Engineering and administrative controls applicable to the hazards and their interrelationships, such as appropriate application of detection methodologies to provide early warning of releases, with acceptable detection methods that might include process monitoring and control instrumentation with alarms and also detection hardware such as hydrocarbon sensors. • Consequences of a failure of engineering and administrative controls. • Facility siting. • Human factors. • Qualitative evaluation of a range of the possible safety and health effects on employees in the workplace if a failure of controls occurs.460 The WFC would have had to address facility siting as part of its PHA. Facility siting refers to the location of the covered process and its proximity to various other components within the facility’s property.461 It does not refer to the site of the facility in relation to the surrounding community.462 A facility siting analysis at the WFC likely would have identified the close proximity of the facility’s FGAN storage warehouse and its anhydrous ammonia storage tanks, thus triggering implementation of necessary safeguards to mitigate the possibility of potentially catastrophic successive incidents involving the two hazardous chemicals. This observation was a critical element of CSB’s investigation because evidence indicated that the FGAN explosion damaged the facility’s anhydrous ammonia tanks. If more force had been applied to the tanks, their contents could have been released into the neighboring community and

that are located so that a highly hazardous chemical could be involved in a potential release— must be considered a single process. 459 OSHA interpretation letter. See: https://www.osha.gov/pls/oshaweb/owadisp.show_document?p_table=INTERPRETATIONS&p_id=23885 (accessed December 28, 2015). 460 See: https://www.osha.gov/Publications/osha3132.html (accessed on December 28, 2015). 461 See: https://www.osha.gov/pls/oshaweb/owadisp.show_document?p_table=DIRECTIVES&p_id=1558 (accessed on December 28, 2015). 462 Ibid.

West Fertilizer Company Final Report January 2016 179 U.S. CHEMICAL SAFETY AND HAZARD INVESTIGATION BOARD

caused even more fatalities and injuries. However, the WFC was not required to conduct facility siting because it qualified for the PSM standard’s retail facilities exemption. CSB communicated its concern about the retail facilities exemption in its March 31, 2014, comments to OSHA’s December 9, 2013 RFI.463 CSB asked OSHA to consider whether the retail facilities exemption should be revised in order to cover facilities such as WFC, which stored bulk quantities of chemicals covered by the PSM standard.464 8.4.1.1 Revised Interpretation of the PSM Retail Facilities Exemption On July 22, 2015, OSHA issued a memorandum, “Process Safety Management of Highly Hazardous Chemicals and Application of the Retail Exemption” (Retail Exemption Memorandum).465 OSHA noted in the memorandum that the PSM exemption for retail facilities does not define the term “retail facility.”466 However, the agency also said that the preamble to the PSM standard does explain that chemicals in retail facilities are generally sold in “small volume packages, containers, and allotments.”467 OSHA pointed out that the preamble gives an example of a gasoline station as a type of facility that would fit within the definition of a retail facility and thus qualify for the exemption.468 OSHA also mentioned in the Retail Exemption Memorandum that other federal agencies define the term similarly.469 In particular, it states that the U.S. Department of Commerce, which develops NAICS codes, characterizes retail trade as follows (emphasis added): The Retail Trade sector comprises establishments engaged in retailing merchandise, generally without transformation, and rendering services incidental to the sale of merchandise. The retailing process is the final step in the distribution of merchandise; retailers are, therefore, organized to sell merchandise in small quantities to the general public. 470 However, this is not how OSHA had always interpreted its PSM retail exemption. After promulgation of the PSM standard, OSHA issued a series of letters of interpretation471 and a PSM compliance directive472 that interpreted the retail exemption more broadly than originally intended.473 Under these interpretations, a facility was considered exempt from the PSM standard if it derived “more

463 See: http://www.csb.gov/assets/1/16/CSB_RFIcomments.pdf (accessed on December 28, 2015). 464 Ibid. 465 OSHA. “Process Safety Management of Highly Hazardous Chemicals and Application of the Retail Exemption (29 CFR 1910.119(a)(2)(i)).” OSHA Memorandum, July 22, 2015. 466 Ibid. 467 57 Federal Register 6356, 6369. 468 Ibid. 469 OSHA. “Process Safety Management of Highly Hazardous Chemicals and Application of the Retail Exemption (29 CFR 1910.119(a)(2)(i)).” OSHA Memorandum, July 22, 2015. 470 U.S. Department of Commerce. NAICS Manual, Sector 44–45: Retail Trade. 471 OSHA letters of interpretation explain OSHA requirements, which are set by statute, standards, and regulations. 472 OSHA. Compliance Directive (CPL) 02-03-045. 473 OSHA. “Process Safety Management of Highly Hazardous Chemicals and Application of the Retail Exemption (29 CFR 1910.119(a)(2)(i)).” OSHA Memorandum, July 22, 2015.

West Fertilizer Company Final Report January 2016 180 U.S. CHEMICAL SAFETY AND HAZARD INVESTIGATION BOARD

than 50 percent of its income from direct sales of highly hazardous chemicals to the end user” (the 50 percent test).474 This rationale is how the WFC claimed the retail exemption for its storage of anhydrous ammonia. If FGAN had been covered under the PSM standard before the WFC incident, the retail exemption, as it had been interpreted, would have precluded PSM coverage at the WFC and similar facilities. In addition, this 50 percent test allowed employers that sold or distributed large bulk quantities of highly hazardous chemicals directly to end users to claim the exemption, even if the end users were themselves commercial establishments.475 This reasoning led to confusion about the definition of the term “end user.” In its Retail Exemption Memorandum, OSHA said that it did not intend either of these outcomes. OSHA’s Retail Exemption Memorandum rescinded all previous documents, letters of interpretation, and memoranda related to the retail exemption and the 50 percent test.476 OSHA states that its interpretation of the exemption is now more consistent with the standard’s original intent.477 In reference to the NAICS Manual, OSHA states that: Only facilities, or the portions of facilities, engaged in retail trade as defined by the current and any future updates to sectors 44 and 45 of the NAICS Manual may be afforded the retail exemption at 29 CFR 1910.119(a)(2)(i).478 Facilities that fall within Sectors 44–45: Retail Trade, consist of a number of subsectors. These facilities are now (or are still) considered retail facilities eligible for the retail exemption. Notably, NAICS codes typically used for FGAN bulk storage and sales do not fit into one of these classifications. As such, facilities that store or sell bulk FGAN do not qualify for the retail exemption. If OSHA’s new interpretation were in effect before the incident, the WFC could not have claimed the retail exemption for its storage of anhydrous ammonia. Furthermore, it could not have claimed the exemption for its storage of FGAN had FGAN been included on the PSM list pre-incident. If this new interpretation had been in effect before the incident, the WFC might have recognized that its storage of anhydrous ammonia was covered by the PSM standard. Although compliance efforts would have focused on this potential hazard, the WFC might have learned about FGAN-related hazards as well. As previously discussed, if the WFC had conducted a facility siting analysis, it could have identified the close proximity of its FGAN storage warehouse to its anhydrous ammonia pressure tanks. This may have

474 Ibid. 475 Ibid. 476 Ibid. 477 Ibid. According to a December 23, 2015, OSHA memorandum, through September 30, 2016, OSHA will not cite employers for violations of the PSM standard at facilities that it would not have cited applying the interpretation of the term “retail” that was in place prior to July 22, 2015. 478 OSHA. “Process Safety Management of Highly Hazardous Chemicals and Application of the Retail Exemption (29 CFR 1910.119(a)(2)(i)).” OSHA Memorandum, July 22, 2015. Facilities that fall under Sectors 44–45: Retail Trade consist of a number of subsectors, including Motor Vehicle and Parts Dealers (NAICS 441), Building Material and Garden Equipment and Supplies Dealers (NAICS 444), Gasoline Stations (NAICS 447), and General Merchandise Store (NAICS 452).

West Fertilizer Company Final Report January 2016 181 U.S. CHEMICAL SAFETY AND HAZARD INVESTIGATION BOARD

led the WFC to explore the potential for FGAN to catch fire and detonate under certain conditions. It also may have caused the WFC to implement safeguards to prevent hazards associated with the two different chemicals. OSHA’s revised interpretation of the retail exemption would mean that facilities such as the WFC would be covered for their use of anhydrous ammonia. According to the fertilizer industry, more than 3,800 U.S. retail facilities previously exempted by the older interpretation of the retail exemption would be covered under the requirements of the PSM standard because of anhydrous ammonia storage. 479 WFC use of FGAN could also be regulated directly in the future, but only if FGAN were added to PSM’s List of Highly Hazardous Chemicals, Toxics and Reactives. CSB recommends that OSHA consider including FGAN for coverage under the PSM standard.480 CSB supports OSHA’s revised interpretation of the retail exemption to guarantee that potential changes to the PSM standard will apply to facilities like the WFC that store anhydrous ammonia as well as FGAN, which would provide the basis for the CSB’s proposed recommendation to add FGAN to the PSM list. 8.4.1.2 Guidance on Recognized and Generally Accepted Good Engineering Practices Under the PSM Standard OSHA also recently addressed its reference to the common industry term, “recognized and generally accepted good engineering practices” (RAGAGEP), under its PSM standard. This term is often used in performance-based standards like PSM. Generally, standards can be either prescriptive or performance based. As its name suggests, a prescriptive standard sets rigid compliance specifications. A performance- based standard, on the other hand, simply delineates the expected performance outcome or end result, without specifying how the outcome or result is to be achieved. In other words, a prescriptive standard describes how something is to be achieved, but a performance-based standard only specifies what is to be accomplished. For example, OSHA’s Explosives and Blasting Agents standard (Section 8.2) is a prescriptive standard that contains FGAN-specific provisions. That part of the standard is prescriptive because its provisions set out how to handle FGAN; the provisions are inflexible. In contrast, OSHA’s PSM standard is performance-based. It employs a broad approach to materials and applications and enables incorporation of current industry practices. As a performance-based standard, it allows employers to select the RAGAGEP that they choose to apply to their facilities.481 These chosen RAGAGEP are the ones that employers must follow at their facilities so that they are deemed compliant. Although the PSM standard does not define RAGAGEP, OSHA’s Petroleum Refinery PSM National

479 TFI/ARA Hearing Statement: “Examining the Use of Agency Regulatory Guidance.” See: http://www.mo- ag.com/uploaded/Senate%20HSGAC%20RFAM%20Hearing%209-23-15.pdf (accessed December 1, 2015). 480 OSHA has initiated a Small Business Regulatory Enforcement Fairness Act panel on its PSM standard, after issuing an RFI in November 2013 seeking public comment on ways to improve the standard. ATF/OSHA/EPA. “Actions to Improve Chemical Facility Safety and Security.” ATF/OSHA/EPA Fact Sheet, June 2015. 481 OSHA. “RAGAGEP in Process Safety Management Enforcement.” OSHA Memorandum, June 8, 2015.

West Fertilizer Company Final Report January 2016 182 U.S. CHEMICAL SAFETY AND HAZARD INVESTIGATION BOARD

Emphasis Program references the definition established in the Center for Chemical Process Safety’s Guidelines for Mechanical Integrity Systems: Recognized and Generally Accepted Good Engineering Practices (RAGAGEP) are engineering, operation, or maintenance activities based on established codes, standards, published technical reports or recommended practices or a similar document. RAGAGEP detail generally approved ways to perform specific engineering, inspection or mechanical integrity activities, such as fabricating a vessel, inspecting a storage tank, or servicing a relief valve.482 This is the definition OSHA references in addressing its use of the term under the PSM standard. Following the WFC incident, OSHA provided guidance on its use of the term RAGAGEP under its PSM standard in a June 8, 2015, memorandum, “RAGAGEP in Process Safety Management Enforcement” (PSM RAGAGEP Memorandum). As noted by OSHA in its PSM RAGAGEP Memorandum, the PSM standard directly references or implies the use of RAGAGEP in three provisions:

  1. 29 CFR 1910.119(d)(3)(ii): Employers must document that all equipment in PSM-covered

processes complies with RAGAGEP.

  1. 29 CFR 1910.119(j)(4)(ii): Inspections and tests are performed on process equipment subject to

the standard’s mechanical integrity requirements in accordance with RAGAGEP.

  1. 29 CFR 1910.119(j)(4)(iii): Inspection and test frequency follows manufacturer’s

recommendations and good engineering practice, and more frequently if indicated by operating experience.483 Accordingly, RAGAGEP under the PSM standard apply to process equipment design, installation, operation, and maintenance; inspection and test practices; and inspection and test frequencies.484 The PSM RAGAGEP Memorandum notes the following primary sources of RAGAGEP: (1) published and widely adopted codes, (2) published consensus documents, and (3) published nonconsensus documents.485 Published and widely adopted codes are those consensus standards that have been widely adopted by federal, state, or municipal jurisdictions.486 Published consensus documents are identified as those published by certain organizations which must follow the American National Standards Institute (ANSI) “Essential Requirements: Due process requirements for American National Standards” (ANSI Essential Requirements).487 Published nonconsensus documents include publications that do not conform to the ANSI Essential Requirements and peer-reviewed technical articles.488 It is important to note that

482 OSHA. Compliance Directive (CPL) 03-00-010. 483 OSHA. “RAGAGEP in Process Safety Management Enforcement.” OSHA Memorandum, June 8, 2015. 484 Ibid. 485 Ibid. 486 Ibid. Examples of published and widely adopted codes include NFPA 101 (Life Safety Code) and NFPA 70 (National Electric Code). 487 Ibid. Examples of published consensus documents include the ASME B31.3, “Process Piping Code,” and the International Institute of Ammonia Refrigeration (IIAR) ANSI/IIAR 2-2008, “Equipment, Design, and Installation of Closed-Circuit Ammonia Mechanical Refrigerating Systems.” 488 Ibid. Examples of published nonconsensus documents include the Chlorine Institute “pamphlets” focusing on chlorine and sodium hypochlorite safety and the Design Institute for Emergency Relief Systems guideline book addressing technology for reactive and multiphase relief systems design.

West Fertilizer Company Final Report January 2016 183 U.S. CHEMICAL SAFETY AND HAZARD INVESTIGATION BOARD

while OSHA generally accepts published and widely adopted codes and published consensus documents as RAGAGEP, published nonconsensus documents are not necessarily generally accepted. However, OSHA may choose to accept them if they are applicable and appropriate.489 The PSM RAGAGEP Memorandum also explains the difference between “shall” and “should” language. In particular, OSHA notes that positive and negative uses of “shall,” “must,” or similar language in published RAGAGEP reflect the developer’s view that the practice is a mandatory minimum to control a hazard.490 Thus, if an employer deviates from such RAGAGEP, OSHA will presume a violation.491 Where “should” language applies in RAGAGEP, OSHA presumes that employer compliance with the recommended approach is acceptable.492 If an employer chooses to deviate from the recommended approach, however, OSHA will evaluate whether the employer has determined and documented that its alternative approach is at least as protective as the recommended approach or whether the recommended approach does not apply to the employer’s operation.493 OSHA presumes a violation if employers act in a way that RAGAGEP deem they “should not.”494 These enforcement considerations emphasize that RAGAGEP are more than optional recommendations. Many RAGAGEP are mandatory standards based on scientific data and previous incidents and it is crucial that employers comply with them. If FGAN is added to the PSM list, the use of RAGAGEP will allow facilities to select and comply with FGAN-specific standards, such as NFPA 400, that have been recently updated to address and help prevent the conditions that led to the WFC explosion. 8.4.2 EPA Risk Management Program Rule The EPA Risk Management Program rule (40 CFR Part 68, Subparts A through H) is intended to prevent and minimize the consequences of accidental releases of toxic or flammable substances.495 Enacted in 1996, the regulation required facilities to be compliant by 1999.496 In general, covered facilities are those with a substance on one of the Risk Management Program rule’s two lists, one for toxic substances and one for flammable substances, in a quantity that meets or exceeds the threshold quantity for the substance.497 These facilities must perform a hazard assessment, consisting of worst case and alternative release scenarios as well as a five-year accident history; implement an accident prevention program (which is required for most facilities); establish an emergency response program; and develop an RMP

489 Ibid. 490 Ibid. 491 Ibid. 492 Ibid. 493 Ibid. 494 Ibid. 495 EPA. “Accidental Release Prevention Requirements: Risk Management Program Under the Clean Air Act.” RFI, July 31, 2014. 496 See: http://nepis.epa.gov/Exe/ZyPDF.cgi/100038BD.PDF?Dockey=100038BD.PDF (accessed on December 28, 2015). 497 See: http://www.epa.gov/rmp/risk-management-plan-rmp-rule-overview (accessed on December 28, 2015).

West Fertilizer Company Final Report January 2016 184 U.S. CHEMICAL SAFETY AND HAZARD INVESTIGATION BOARD

and submit it to EPA.498 Facility management must revise and resubmit its RMP to EPA at least every five years.499 EPA has developed three program levels for process classification to ensure that individual processes are subject to requirements that appropriately match their size and risks they pose.500 Program Level 1 applies to processes with lower risks that would not significantly affect the public in a worst case release scenario and that have had no accidents with specific offsite consequences in the last five years.501 These facilities have limited and/or minimal accident prevention requirements.502 Program Levels 2 and 3 cover higher-risk facilities that must meet more stringent accident prevention requirements.503 A Program Level 3 facility is not eligible for classification under Program Level 1 and is either (1) subject to OSHA’s PSM standard or (2) classified in one of 10 specified NAICS codes.504 Program Level 3 requires implementation of an accident prevention program that is virtually equivalent to the one required under the PSM standard.505 Program Level 2 applies to facilities that are not eligible for classification in Program Level 1 or Program Level 3.506 Program Level 2 requires implementation of a streamlined accident prevention program.507 The WFC was a Program Level 2 facility under the Risk Management Program rule for its storage of anhydrous ammonia, a regulated substance, which the WFC kept in amounts that exceeded the substance’s threshold quantity. Program Level 2 facilities must conduct hazard reviews.508 For this requirement to be satisfied, facilities must conduct a review and identify the following: • Hazards associated with the Program 2 process and regulated substances. • Opportunities for equipment malfunction or human error that could cause a release. • Safeguards that will control the hazards or prevent the malfunction or error. • Steps to detect or monitor releases.509

498 Ibid. 499 Ibid. 500 See: http://www.epa.gov/sites/production/files/2013-10/documents/caa112_rmp_factsheet.pdf (accessed on December 28, 2015). 501 Ibid. 502 Ibid. 503 Ibid. 504 Ibid. These 10 manufacturing NAICS codes are (1) 32211 pulp mills; (2) 32411 petroleum refineries; (3) 32511 petrochemical manufacturing; (4) 325181 alkalis and chlorine manufacturing; (5) 325188 all other basic inorganic chemical manufacturing; (6) 325192 cyclic crude and intermediate manufacturing; (7) all other basic organic chemical manufacturing; (8) plastics material and resin manufacturing; (9) nitrogenous fertilizer manufacturing; and (10) pesticide and other agricultural chemical manufacturing. See: http://www2.epa.gov/sites/production/files/2013- 11/documents/cd-chap-02.pdf (accessed on December 28, 2015). 505 See: http://www.epa.gov/sites/production/files/2013-10/documents/caa112_rmp_factsheet.pdf (accessed on December 28, 2015). 506 Ibid. 507 Ibid. 508 See: http://www.epa.gov/sites/production/files/2013-11/documents/chap-06-final.pdf (accessed on December 28, 2015). 509 Ibid.

West Fertilizer Company Final Report January 2016 185 U.S. CHEMICAL SAFETY AND HAZARD INVESTIGATION BOARD

CSB discovered that the WFC implemented a prevention program that included a hazard review. In its most recent RMP from 2011, the WFC identified major hazards, which included toxic releases, equipment failure, and earthquakes, but did not include fire or explosion.510 The facility also indicated that it did not use mitigation systems, such as sprinklers, for its storage of anhydrous ammonia.511 Clearly, this hazard review did not provide the type of protection needed to address the fire and explosion that occurred on the day of the WFC incident. Because FGAN is not a regulated substance, the WFC was not required to conduct such a hazard review for its storage of FGAN. Accordingly, CSB recommends that FGAN be added to the Risk Management Program list.512 CSB contends that EPA should consider adding FGAN to the list of regulated substances, taking into account the more recent recognition of the unpredictable explosive hazards of FGAN, better awareness of the location of FGAN facilities across the United States, greater knowledge of the quantity of FGAN normally stored at these facilities, and continuance of FGAN-related incidents since the issuance of the final Risk Management Program list. As demonstrated in Appendix B, FGAN-related incidents continue to occur, domestically and abroad. Despite tremendous property damage and economic cost, the most devastating result of these incidents is the immeasurable loss of human life. CSB found that a likely cause of such loss of life is the alarming number of FGAN facilities located in communities—next to schools, hospitals, residences, and businesses (discussed in Section 9). Another cause, as determined by CSB, is the tendency of these facilities to store FGAN in large quantities. Coupling these factors with the more recent recognition that FGAN is susceptible to unstable detonation under certain conditions, CSB recommends that FGAN be listed under the Risk Management Program rule. Moreover, CSB reviewed original listing criteria and found that inclusion of FGAN on the Risk Management Program list is warranted. 8.4.2.1 Risk Management Program Rule Listing Criteria Background Under CAA Section 112(r)(4), the factors to be considered in listing substances for Risk Management Program rule coverage are (1) the severity of acute adverse health effects associated with accidental releases of the substance, (2) the likelihood of accidental releases of the substance, and (3) the potential magnitude of human exposure to accidental releases of the substance.513 When EPA first promulgated its Risk Management Program list of chemicals and threshold quantities in 1994, it reviewed 11 different lists, including three EPA lists.514 The criteria used for development of these lists were reviewed to determine whether the criteria were related to the factors mandated by Congress for list development

510 WFC 2011 RMP submission to EPA. 511 Ibid. 512 EPA has issued a RFI and worked on a Notice of Proposed Rulemaking for its Risk Management Program rule. ATF/OSHA/EPA. “Actions to Improve Chemical Facility Safety and Security.” ATF/OSHA/EPA Fact Sheet, June 2015. 513 58 Federal Register 5102 (January 19, 1993). 514 Ibid.

West Fertilizer Company Final Report January 2016 186 U.S. CHEMICAL SAFETY AND HAZARD INVESTIGATION BOARD

under CAA Section 112(r).515 Acute toxicity was generally considered in developing these lists of chemicals, but some also used flammability and explosivity as criteria for regulating chemicals.516 As part of its review of the first factor to be considered for listing substances under the Risk Management Program rule, EPA reviewed chemicals that could cause severe acute adverse health effects. EPA found that the severity of acute adverse health effects can be related to the inherent hazards (i.e., hazardous material properties that cannot be changed) of the substances of interest, such as the toxicity of a substance resulting in lethal effects.517 EPA noted that acute adverse health effects also could result from other inherent hazards, such as the flammability or high reactivity of the substance.518 Importantly, it stated that the phenomena associated with these hazards could be, for example, radiant heat from a chemical fire or blast waves from an explosion of a chemical.519 In reviewing the second Risk Management Program listing criteria factor, EPA stated that the likelihood of an accidental release of a chemical can be related to typical usage and handling scenarios, such as equipment commonly used in typical facility operations.520 EPA stated that ubiquitous substances, because of greater handling and use, might have a greater potential for an accidental release.521 The agency observed that a history of a large number of accidents in the past, for example, might be an indicator of an existing hazard related to a particular substance and its potential to be involved in accidental releases in the future.522 Notably, EPA stated that chemicals that are found in large volumes at many locations and chemicals that are particularly prevalent (e.g., commodity chemicals, like chlorine and ammonia) might be more likely to be involved in accidental releases than small-volume, less commonly used chemicals.523 With respect to the last factor to be considered for Risk Management Program listing, EPA found the magnitude of human exposure associated with accidental releases to be related to the severity of the health effects (hazards) and the likelihood of a release (the chance that a release will have an effect on the population of environment beyond the facility fenceline).524 The agency noted that this definition was somewhat different from the traditional risk assessment definition of human exposure, which relates magnitude of exposure to the population and sensitive environments that might be affected by a release from a specific site.525 It recognized that factors that might affect the magnitude of human exposure could be site specific or accident specific and could vary widely by location and incident.526 Significantly, EPA

515 Ibid. 516 Ibid. 517 Ibid. 518 Ibid. 519 Ibid. 520 Ibid. 521 Ibid. 522 Ibid. 523 Ibid. 524 Ibid. 525 Ibid. 526 Ibid.

West Fertilizer Company Final Report January 2016 187 U.S. CHEMICAL SAFETY AND HAZARD INVESTIGATION BOARD

also contended that proximity to population centers, for example, might play a role in the magnitude of accidental releases.527 8.4.2.2 Risk Management Program Rule Listing Criteria and Coverage for FGAN CSB reviewed the original listing criteria to determine their application to FGAN and found support for inclusion of FGAN on the Risk Management Program list. First, CSB found a high severity of acute adverse health effects related to accidental releases of FGAN because one of the phenomena associated with the hazards of FGAN as a reactive and as an explosive is blast waves from an FGAN explosion. Acute adverse health effects from blast waves can include not only major injuries (such as fractures and injuries to the head, ears, and eyes), but also death. All of these were reported after the WFC incident. As stated previously, EPA specifically deemed blast waves to be considered in assessing the severity of acute adverse health effects related to accidental releases of the substance. CSB concluded that FGAN meets the second criteria for listing under the Risk Management Program rule because the likelihood of accidental releases of FGAN is high. Before assessing the merits of this listing factor, CSB sought to define such accidental releases and ultimately found that they can be described as emissions of blast waves and thermal energy from FGAN explosions. An accidental release is defined by the CAA Amendments of 1990 as “an unanticipated emission of a regulated substance or other extremely hazardous substance into the ambient air from a stationary source.”528 In general, this definition has been interpreted to apply only to gases and liquids, not to solids such as FGAN.529 However, in its original Risk Management Program rule listing notice, EPA determined the proposed threshold quantity for high explosives530 based on the quantity that could produce potentially lethal blast waves from an explosion at a distance of 100 meters.531 This determination is significant because it supports the conclusion that EPA envisioned blast waves as qualifying as unanticipated emissions when it considered explosives for addition to the Risk Management Program list. CSB also conducted its own research on explosions and emissions. An explosion involves a sudden release of large amounts of energy. This energy release can be dissipated as blast waves, propulsion of

527 Ibid. 528 40 CFR 68.3 529 ARA. “Re: Accidental Release Prevention Requirements: Risk Management Programs under the Clean Air Act, Section 112(r)(7); Request for Information; Docket # EPA-HQ-OEM-2014-0328; FRL-9911-61-OSWER.” October 29, 2014. 530 High explosives represent the category of explosives that might most easily detonate. 59 Federal Register 4487 (January 31, 1994). They are likely to cause severe impacts in detonation scenarios. These explosives were subsequently deleted from coverage in 1998 due to settlement of litigation with the Institute for Manufacturers of Explosives. 63 Federal Register 640 (January 6, 1998). It is important to note, however, that this was not due to any potential misinterpretation of the term “accidental release” (as discussed in the Explosive Substances Section). 531 58 Federal Register 5102 (January 19, 1993).

West Fertilizer Company Final Report January 2016 188 U.S. CHEMICAL SAFETY AND HAZARD INVESTIGATION BOARD

debris, or the emission of thermal and ionizing radiation.532 Furthermore, the term “emissions” is not strictly limited to the release of toxic or flammable liquids and vapors. It can refer to the generation of hot gases and overpressures that result from explosions. This interpretation aligns with EPA’s reasoning that explosives can produce accidental releases, as demonstrated by EPA’s original inclusion of high explosives on the Risk Management Program list and by its associated determination of the appropriate threshold quantity for such explosives. CSB supports EPA’s original reasoning that blast waves are emissions for purposes of listing substances under the Risk Management Program rule. In particular, CSB supports that this reasoning should apply to FGAN. CSB concluded that there is a reasonable likelihood of an accidental release of FGAN because FGAN is a ubiquitous commodity chemical that is stored in large volumes at many locations. CSB found that this was true not only at the WFC facility (where the WFC stored 80,000 to 120,000 pounds of FGAN), but also at domestic fertilizer facilities throughout the South and the Midwest where Alabama, Missouri, Tennessee and Texas make up more than 50 percent of FGAN consumption in the United States.533 FGAN also has been involved in a large number of accidents in the past (described in Appendix B). It has been at the center of major disasters such as the Oppau, Germany, incident in 1921 and the Texas City, Texas, incident in 1947; each caused more than 500 fatalities. EPA considered these exact factors (i.e., ubiquity, commodity, volume, and past accident history) to be indicative of whether an accidental release of a substance is likely. Finally, CSB determined the magnitude of human exposure associated with accidental FGAN releases is significant because FGAN storage is commonly located close to many population centers. This was clearly the case in West, Texas, where a playground, four public school buildings, a nursing home, and an apartment complex all surrounded the WFC facility. It is also the case throughout Texas, where many fertilizer facilities are in communities and downtown neighborhoods (noted in Section 5.4). Because of the WFC investigation and other CSB investigations that identified offsite consequences from chemical releases, land use planning and siting of chemical facilities remain important issues for CSB. As discussed previously, EPA considered the proximity of facilities to population centers as a significant determinant of potential impact. The WFC incident demonstrates the validity of this conclusion. After finding that all three listing criteria were satisfied, CSB concludes that FGAN warrants listing under the Risk Management Program rule.

532 Akhavan, Chemistry of Explosives (3rd Edition). London: Royal Society of Chemistry, 2011. See: http://app.knovel.com/hotlink/toc/id:kpCEE0001C/chemistry-explosives/chemistry-explosives (accessed on November 14, 2015). 533 See: https://www.tfi.org/sites/default/files/documents/ammoniumnitrateinfographic.pdf (accessed November 17, 2015). Akhavan, Chemistry of Explosives (3rd Edition). London: Royal Society of Chemistry, 2011. See: http://app.knovel.com/hotlink/toc/id:kpCEE0001C/chemistry-explosives/chemistry-explosives (accessed on November 14, 2015). 533 See: https://www.tfi.org/sites/default/files/documents/ammoniumnitrateinfographic.pdf (accessed November 17, 2015).

West Fertilizer Company Final Report January 2016 189 U.S. CHEMICAL SAFETY AND HAZARD INVESTIGATION BOARD

  1. 4.2.3 Additional Support for Risk Management Program Rule Coverage for FGAN

Besides considering the three listing criteria factors mandated under the CAA, EPA identified other substances based on similarities with the mandated substances and selection criteria.534 EPA considered options that accounted for the inherent hazards of the substances to be listed and for the potential of these hazards to affect the community if an accidental release occurred.535 In particular, EPA analyzed hazards such as toxicity, flammability, reactivity, explosivity, and radioactivity, stating that all of them can result in acute effects after short-term exposure.536 EPA identified substances associated with each of these hazards, but also considered the potential impact that the identified substances would have on the community if a release took place.537 It evaluated each hazard independently, as well as each hazard’s potential to pose a threat to the community.538 Ultimately, a group of toxic substances, a group of flammable substances, and a group of explosive substances were proposed in the January 19, 1993, rule for addition to the 16 mandated substances in the CAA.539 Because they pertain to FGAN, CSB conducted further research on explosives and on reactive substances. Explosive Substances With respect to the group of explosive substances, EPA proposed to focus on physical hazards because of their ability to impact communities beyond the fenceline in the event of an accidental release.540 EPA viewed commercial high explosives, which have the potential to detonate, as the explosive substances with the greatest potential to affect such communities and therefore proposed commercial high explosives as a category for listing.541 In determining the threshold methodology, EPA indicated that a blast wave overpressure of 3.0 psi from a detonation could have potentially lethal effects in communities beyond the fenceline.542 The agency noted that this overpressure level could cause serious structural damage to buildings, lead to serious wounds from flying glass, and potentially cause eardrum rupture.543 The agency also considered reactive substances that have explosive properties, including oxidizers (e.g., pure AN), for listing.544 In its final decision however, EPA deferred listing these types of substances for lack of an adequate technical basis upon which to evaluate offsite consequences from unstable and reactive substances.545 Nonetheless, EPA concluded in its response that “this decision does not preclude the

534 58 Federal Register 5102 (January 19, 1993). 535 Ibid. 536 Ibid. 537 Ibid. 538 Ibid. 539 Ibid. 540 Ibid. 541 Ibid. 542 Ibid. 543 Ibid. 544 Ibid. 545 EPA. “Proposed List of Substances and Thresholds for Accidental Release Prevention: Summary and Response to Comments,” January 14, 1994: 146.

West Fertilizer Company Final Report January 2016 190 U.S. CHEMICAL SAFETY AND HAZARD INVESTIGATION BOARD

Agency from revisiting this issue in the future, in response to a petition to list, or when the list is reviewed and the listing criteria modified.”546 For several decades, a number of agencies and organizations have regulated materials with explosive potential. ATF regulates the manufacture, processing, use, distribution, and storage of explosive materials; ATF regulations include requirements for licensing, permitting, and recordkeeping and for storage of explosives.547 DOT regulates the transportation of explosives, and other agencies, such as OSHA, Mine Safety and Health Administration (MSHA), Department of Defense (DOD), and International Maritime Organization, regulate certain aspects of the explosive industry.548 In its 1993 Federal Register notice, however, EPA stated that although explosives are regulated by federal, state, and local governments, these regulations do not uniformly address the issue of using appropriate hazard assessment techniques to identify hazards, designing and maintaining a safe facility, and minimizing the consequences of accidental releases when they do occur.549 EPA noted that all of these elements were to be addressed in the Risk Management Program regulations, which it described as “intended to help focus on accident prevention.”550 The agency therefore asserted that these substances should be considered for purposes of list development and accidental release prevention regulations, and for some time, high explosives (classified as Class 1, Division 1.1 on DOT’s Hazardous Materials Table) were included on the final 1994 Risk Management Program list.551 However, DOT Division 1.1 explosives were delisted four years later.552 After promulgation of the Risk Management Program list, the Institute of Makers of Explosives (IME) petitioned against EPA for judicial review, challenging the listing of high explosives.553 IME objections included the contention that existing ATF, DOT, MSHA, and OSHA regulations already adequately controlled DOT Division 1.1 explosives.554 EPA and IME ultimately settled, with EPA agreeing to delist the explosives in exchange for IME’s promise to undertake specific measures to enhance local emergency response.555 CSB found this information important with respect to its investigation because FGAN has explosive properties under certain conditions. Accordingly, CSB conducted research to determine whether FGAN was listed and then delisted along with these DOT Division 1.1 explosives. CSB found that DOT Division 1.1 explosives include one less common form of AN (classified by the United Nations as UN0222) containing more than 0.2 percent carbonaceous material. However, this form of AN is not commercially used or manufactured. Importantly, CSB discovered that FGAN has never

546 Ibid. 547 58 Federal Register 5201 (January 19, 1993). 548 Ibid. 549 Ibid. 550 Ibid. 551 Ibid. 552 79 Federal Register 44607 (July 31, 2014). 553 61 Federal Register 16598 (April 15, 1996). 554 Ibid. 555 Ibid. See also: 63 Federal Register 640 (January 6, 1998).

West Fertilizer Company Final Report January 2016 191 U.S. CHEMICAL SAFETY AND HAZARD INVESTIGATION BOARD

been explicitly regulated under the Risk Management Program rule because it is not a DOT Division 1.1 explosive. Furthermore, even if FGAN were a DOT Division 1.1 explosive, the DOT Division 1.1 explosives were never specifically identified by name on the Risk Management Program list. Therefore, AN has never explicitly been listed under the Risk Management Program rule. Nonetheless, CSB found it significant that EPA evaluated explosives, and the effects they can have upon communities in detonation scenarios, when determining the substances to include on the Risk Management Program list.556 Because FGAN can detonate under certain conditions, CSB recommends that FGAN be included for coverage under the Risk Management Program rule. Further support for including FGAN on the Risk Management Program list can be found in EPA’s original inquiry into reactive substances and in CSB’s past work on reactives. Reactive Substances At the time of its 1993 Federal Register notice, EPA was attempting to evaluate the hazards of reactive and unstable chemicals and to develop an adequate technical basis for determining the potential effects on the community.557 For example, EPA investigated computer models that estimate heats of reaction and also the possible use of heats of reaction to compare the effects of an explosion of an unstable substance to the effects of an explosion of TNT.558 EPA stated that this method would only be appropriate for substances that detonate, an outcome that appeared to be unlikely for many unstable substances.559 Ultimately, EPA contended that unstable and reactive substances would be considered for listing for accidental release prevention if the evaluation indicated potential community consequences.560 On the basis of the WFC investigation and on the CSB’s “Improving Reactive Hazard Management” study, CSB recommends that FGAN be added to the Risk Management Program list. In the early 1990s, EPA considered listing reactive substances, such as AN, on the Risk Management Program list.561 Specifically, EPA assessed whether to include chemicals whose reactive properties could cause impacts on nearby communities in the event of an accident.562 In December 2002, CSB issued the study, “Improving Reactive Hazard Management,” which examined reactive hazard management across the United States.563 The study found regulatory coverage of reactive hazards to be a key issue.564 As a result of the study, CSB issued several regulatory recommendations, including the following recommendation to EPA: Revise the Accidental Release Prevention Requirements, 40 CFR 68, to explicitly cover catastrophic reactive hazards that have the potential to seriously impact the public, including

556 58 Federal Register 5102 (January 19, 1993). 557 Ibid. 558 Ibid. 559 Ibid. 560 Ibid. 561 Ibid. 562 Ibid. 563 CSB. “Hazard Investigation: Improving Reactive Hazard Management.” December 2001. 564 CSB. “Hazard Investigation: Improving Reactive Hazard Management.” December 2001, 3.

West Fertilizer Company Final Report January 2016 192 U.S. CHEMICAL SAFETY AND HAZARD INVESTIGATION BOARD

those resulting from self-reactive chemicals and combinations of chemicals and process-specific conditions. Take into account the recommendations of this report to OSHA on reactive hazard coverage. Seek congressional authority if necessary to amend the regulation.565 Unfortunately, EPA has not initiated rulemaking consistent with CSB’s recommendation more than 10 years since its issuance.566 Therefore, CSB has categorized the status of this recommendation as “Open— Unacceptable Response.”567 Since issuing its reactive hazard investigation study in 2002, CSB has investigated several industrial accidents involving reactive chemicals.568 These are summarized in Table 12. Table 12. CSB Investigations Involving Reactive Chemicals Since 2002 Incident Date Location Severity First Chemical Corp.: Reactive Chemical Explosion October 13, 2002 Pascagoula, MS • 3 injured MFG Chemical Inc.: Toxic Gas Release April 12, 2004 Dalton, GA • 154 hospitalized Synthron Chemical: Explosion July 31, 2007 Morganton, NC • 1 fatality • 12 injured T2 Laboratories Inc.: Reactive Chemical Explosion December 19, 2007 Jacksonville, FL • 4 fatalities • 13 hospitalized Bayer CropScience: Pesticide Waste Tank Explosion August 28, 2008 Institute, WV • 2 fatalities West Fertilizer Company: Explosion and Fire April 17, 2013 West, TX • 15 fatalities • More than 260 injured

It is important to note, however, that Table 12 depicts only those incidents involving reactive chemicals that CSB investigated since 2002. That is, these incidents do not represent the universe of reactive chemical accidents, which is much larger.

565 CSB. “Hazard Investigation: Improving Reactive Hazard Management.” December 2001, 102. 566 CSB. “Recommendations Status Change Summary.” Improving Reactive Hazard Management, 2001-1-H-R3. March 11, 2014. 567 See: http://www.csb.gov/recommendations/?F_RecipientId=8 (accessed on December 17, 2015). OSHA’s associated recommendations are also categorized as “Open—Unacceptable Response.” See: http://www.csb.gov/UserFiles/file/CSB-OSHACorrespondence.pdf (accessed on January 15, 2016). 568 CSB. “Recommendations Status Change Summary.” Improving Reactive Hazard Management, 2001-1-H-R3. March 11, 2014.

West Fertilizer Company Final Report January 2016 193 U.S. CHEMICAL SAFETY AND HAZARD INVESTIGATION BOARD

  1. 4.2.3.1.1 General Duty Clause

After the incident, CSB referenced its reactives study in “Preliminary Findings of the CSB from its Investigation of the West Fertilizer Explosion and Fire.”569 With respect to the EPA Risk Management Program rule, CSB specifically stated: In developing the RMP regulation, the EPA did not explicitly include explosives or reactive chemicals in the list of covered chemicals. In 2002, the CSB issued a study on reactive hazards, identifying 167 prior reactive incidents (including a 1994 explosion at an AN manufacturer). The Board recommended that . . . EPA expand [its] standard[] to include reactive chemicals and hazards. However, [EPA has not] yet acted upon the recommendation[].570 On June 6, 2014, after learning the Open—Unacceptable Response status of its recommendation, EPA raised, in a letter to CSB, its concern that CSB had mischaracterized in its reactives study the scope and history of EPA’s use of the CAA Section 112(r)(1), General Duty Clause (GDC).571 Because the GDC is a provision which CSB believes likely could have been used to cite the WFC facility, but was not, CSB conducted further research into the requirement. The GDC is a statutory obligation that makes owners and operators of facilities that possess regulated and other extremely hazardous substances responsible for ensuring that their chemicals are managed safely.572 In CAA Section 112(r)(1), the GDC states: The owners and operators of stationary sources producing, processing, handling or storing such substances [i.e., a chemical in 40 CFR Part 68 or any other extremely hazardous substance] have a general duty [in the same manner and to the same extent as the general duty clause in the Occupational Safety and Health Act] to identify hazards which may result from (such) releases using appropriate hazard assessment techniques, to design and maintain a safe facility taking such steps as are necessary to prevent releases, and to minimize the consequences of accidental releases which do occur.573 Accordingly, EPA has the authority to apply the GDC to facilities not only after incidents, but also before incidents to prevent them. The GDC is a broad provision with great potential to enhance safety measures at facilities that contain certain hazardous substances. In addressing the hazards associated with reactive substances and application of the GDC, CSB has stated that “many substances are unlikely to be considered ‘extremely hazardous’ since they do not present an inherent catastrophic reactive hazard until combined with other chemicals or under process-specific conditions.”574 This circumstance should not preclude, and EPA affirms has not precluded, such

569 CSB. “Preliminary Findings of the U.S. Chemical Safety Board from its Investigation of the West Fertilizer Explosion and Fire,” June 27, 2013. 570 Ibid. 571 EPA letter to CSB, June 6, 2014. 572 See: http://www2.epa.gov/sites/production/files/2013-10/documents/gdc-fact.pdf (accessed on December 29, 2015). 573 42 U.S.C. § 7412(r)(1). 574 CSB. “Recommendations Status Change Summary.” Improving Reactive Hazard Management, 2001-1-H-R3. March 11, 2014.

West Fertilizer Company Final Report January 2016 194 U.S. CHEMICAL SAFETY AND HAZARD INVESTIGATION BOARD

substances from enforcement under the GDC. EPA referenced a 1989 Report of the Senate Environment and Public Works Committee, which stated that the presumption should be that a substance is extremely hazardous if it causes significant adverse impacts by acute toxic effect or “by blast, fire, corrosion or other reaction.”575 The report also states that “extremely hazardous substances” would “include other agents which may or may not be listed” that “as the result of short-term exposures associated with [accidental] releases to the air cause death, injury or property damage due to their toxicity, reactivity, flammability, volatility, or corrosivity.”576 According to this report, therefore, EPA could apply the GDC to reactive substances. However, EPA did not use the GDC to cite the WFC after the incident for its unsafe storage of FGAN. Considering the totality of the EPA regulatory landscape, CSB determined that requirements for facilities to safely store and handle FGAN are insufficient. As discussed, the Risk Management Program rule does not regulate FGAN because FGAN is not on the list of regulated substances. Furthermore, while EPA could use the GDC to impose requirements on facilities to ensure the safe management of FGAN as a reactive substance, EPA does not contend that the GDC is as easy to apply as a regulation. EPA may have been able to apply the GDC against the WFC after the incident, but it did not. Therefore, without more from the GDC, it is the recommendation of CSB that FGAN be included on the Risk Management Program list, especially in light of the fatal incident in West, Texas. 8.4.2.4 Risk Management Program Rule and Coverage of Anhydrous Ammonia As previously discussed, although the WFC was not covered under the Risk Management Program rule for its storage of FGAN, it was covered under Program Level 2577 of the rule for its storage of more than 10,000 pounds, the threshold limit, of anhydrous ammonia. The facility submitted its RMP registration in 1999, 2006,578 and 2011.579 The WFC’s 2006 RMP for anhydrous ammonia included important safety elements to prevent, control, and respond to an anhydrous ammonia release.580 For example, the insurance company conducted a hazard review to identify major release scenarios and address actions that would prevent or mitigate a release.581 Another important feature of the RMP was development of an emergency action plan with step-by-step procedures, detailing how employees should respond to an anhydrous ammonia release.582 Other program elements included operating procedures, maintenance and

575 EPA letter to CSB, June 6, 2014. 576 Senate Committee on Environment and Public Works, CAA Amendments of 1989, Senate Report No. 228, 101st Congress, 1st Session 211 (1989). 577 The WFC fell under Program 2 requirements for its storage of anhydrous ammonia because it did not meet the requirements for Program Level 3 and was not eligible for Program Level 1 coverage. 578 The WFC did not resubmit its RMP registration as it was supposed to in 2004 because of a change in ownership. EPA cited the company in 2006 for failing to refile its RMP in a timely manner. The WFC refiled it in 2006. 579 WFC RMP submissions to EPA. 580 Ibid. 581 Ibid. 582 Ibid.

West Fertilizer Company Final Report January 2016 195 U.S. CHEMICAL SAFETY AND HAZARD INVESTIGATION BOARD

inspection programs, training programs, incident investigations, offsite consequence analyses, and compliance audits.583 The Risk Management Program rule also required the WFC to comply with RAGAGEP for anhydrous ammonia, such as ANSI K61.1, “Safety Requirements for the Storage and Handling of Anhydrous Ammonia,” and OSHA’s Storage and Handling of Anhydrous Ammonia regulation (29 CFR 1910.111).584 As previously mentioned, the Risk Management Program list does not include FGAN, so the WFC was not required to take related Risk Management Program safety measures for FGAN. Of course, FGAN coverage under the Risk Management Program rule likely would have increased awareness of the explosion hazards of FGAN, leading to better management of the substance through compliance with federal safety regulations and best industry practices. If EPA had included FGAN under the Risk Management Program rule, the WFC would have been required to apply it for its storage of FGAN and perhaps could have reduced the risk of catastrophic accidents like the one that occurred at the WFC. 8.5 Emergency Planning The CSB investigation of the WFC incident identified the explosive potential of FGAN. CSB further found that no immediate evacuation at the first sign of fire occurred, in part because no in-place emergency plan addressed response specifically to an incident at the WFC warehouse. This situation left emergency responders and the West community unaware of the urgent need to evacuate. For FGAN facilities, there must be a well-exercised local emergency plan that emphasizes immediate notification to emergency responders and the community at the first sign of fire, as well as evacuation protocols. If there was an immediate evacuation once the fire was detected at the WFC, the number of fatalities and injuries likely would have been lower. Emergency planning is part of emergency management, which includes four different stages: (1) mitigation, (2) planning, (3) response, and (4) recovery. The nation’s emergency management system is intended to prepare communities for all types of hazards, including natural disasters, terrorism, and hazardous materials (HAZMAT) incidents. The responsibilities of emergency management personnel are shared among federal agencies that provide assistance through funding and training. For example, DHS primarily focuses its efforts on terrorism and natural hazards and also serves as the umbrella organization for other agencies that supply assistance to state and local authorities. Other federal agencies such as EPA and OSHA have emergency planning regulations for environmental and occupational accidents involving HAZMAT. The next sections discuss these regulations at the federal, state, and city levels and discuss their relevance to the WFC incident.

583 Ibid. 584 40 CFR 68.48(b).

West Fertilizer Company Final Report January 2016 196 U.S. CHEMICAL SAFETY AND HAZARD INVESTIGATION BOARD

  1. 5.1 Federal Emergency Planning

In response to growing concerns about the safety and health of people and the environment after releases of hazardous substances in the U.S. in the 1970s and 1980s and the disaster in Bhopal, India, Congress passed new laws authorizing EPA and OSHA to regulate these risks. One was the Emergency Planning and Community Right-to-Know Act (EPCRA) of 1986, which was intended to address concerns about local preparedness for chemical emergencies and to ensure public access to information. EPCRA established a framework for states to organize resources to pre-plan for chemical accidents. EPCRA requirements include: (1) emergency planning (SARA Title III, Sections 301–303); and (2) emergency and hazardous chemical inventory reporting (SARA Title III, Sections 311 and 312).585 Each section of EPCRA covers a subset of chemicals and the statute and EPA regulations specify quantities that trigger reporting requirements (Table 13).586 Because they are pertinent to the WFC incident, requirements for emergency planning and hazardous chemical inventory reporting are discussed in greater detail. Table 13. EPCRA Chemicals and Reporting Thresholds

Section 302 Sections 311 and 312 Chemicals Covered 355 extremely hazardous substances (EHSs) Approximately 500,000 hazardous chemicals Thresholds Threshold planning quantity (TPQ): 1 to 10,000 lbs. onsite at any one time 500 lbs. or TPQ, whichever is lower, for EHSs; 75,000 gallons for gasoline; 100,000 gallons for diesel; and 10,000 lbs. for all other hazardous chemicals

EPCRA emergency planning establishes, in part, requirements for sharing information among industry and state, tribal, and local governments. As shown in Table 13, under Section 302, a facility that has an extremely hazardous substance (EHS) at or above its specific threshold planning quantity (TPQ) must report the substance. Reporting of EHSs, as well as other hazardous chemicals under Sections 311 and 312, must be made to the State Emergency Response Commission (SERC), Local Emergency Planning Committee (LEPC), and local fire department.587 State governors designated the SERCs which then designated roughly 3,500 local emergency planning districts and LEPCs for each district.588 At minimum, LEPCs must be composed of elected state and local officials; police, fire, civil defense, public health, transportation, and environmental professionals; representatives of facilities subject to EPCRA emergency planning requirements; community groups; and

585 Regulations implementing EPCRA are codified at 40 CFR Parts 350–372. 586 See: http://www2.epa.gov/sites/production/files/2013-08/documents/epcra_fact_sheet.pdf (accessed on December 29, 2015). 587 The local fire department receives only inventory information under Sections 311 and 312. 588 See: http://www2.epa.gov/sites/production/files/2013-08/documents/epcra_fact_sheet.pdf (accessed on December 29, 2015).

West Fertilizer Company Final Report January 2016 197 U.S. CHEMICAL SAFETY AND HAZARD INVESTIGATION BOARD

the media.589 SERCs are supposed to supervise and coordinate the activities of LEPCs, establish procedures for receiving and processing public requests for information, and review local emergency response plans.590 LEPCs are supposed to develop emergency response plans, review the plans annually, and provide information to the public.591 EPCRA emergency planning also requires LEPCs to develop and update emergency response plans. LEPCs are supposed to use information reported by facilities to develop these plans, which cover procedures that describe how emergency responders should respond to chemical releases.592 The plans must (1) identify EHS facilities and transportation routes; (2) describe emergency response procedures, onsite and offsite; (3) designate a community coordinator and facility coordinators to implement the plan; (4) outline emergency notification procedures; (5) explain the means to determine the probable area and population affected by chemical releases; (6) describe local emergency equipment and facilities and the people responsible for them; (7) outline evacuation plans; (8) provide a training program for emergency responders (including schedules); and (9) detail methods and schedules for exercising emergency response plans.593 Importantly, EPCRA emergency planning requirements mandate the identification of facilities with EHSs only; identification of facilities without EHSs is not required. Thus, although facilities must report EHSs and certain non-EHSs (i.e., other hazardous chemicals under Sections 311 and 312), only facilities with EHSs trigger EPCRA emergency response plan requirements.594 For purposes of the WFC investigation, CSB determined that while anhydrous ammonia is on the EHS list, FGAN is not. CSB found, however, that AN is on the list of hazardous chemicals under Sections 311 and 312 that triggers emergency and hazardous chemical inventory reporting requirements. EPCRA emergency and hazardous chemical inventory reporting requires reporting of certain quantities of EHSs and hazardous chemicals. As shown in Table 13, under Sections 311 and 312, an EHS must be reported if it is held at the lower of 500 pounds or the substance’s TPQ, gasoline must be reported at 75,000 gallons, diesel must be reported at 100,000 gallons, and all other hazardous chemicals must be reported at 10,000 pounds.595 These reporting requirements are tied to OSHA’s Hazard Communication Standard (29 CFR 1910.1200). This standard requires employers to maintain SDSs for all hazardous chemicals in the workplace.596 SDSs contain crucial information, including chemical and hazard

589 Ibid. See also: 42 U.S.C. §11001(c). 590 Ibid. See also: 42 U.S.C. §11001(a). 591 Ibid. See also: 42 U.S.C. §11001(c). 592 See: http://www2.epa.gov/sites/production/files/2013-08/documents/epcra_fact_sheet.pdf (accessed on December 29, 2015). 593 Ibid. See also: 42 U.S.C. §11003(c). 594 It should be noted that EPA has suggested, through guidance to SERCs and LEPCs (including the most recent fact sheet to these entities), that they include Sections 311 and 312 facilities in their planning process. 595 See: http://www.epa.gov/sites/production/files/2013-08/documents/epcra_fact_sheet.pdf (accessed on December 29, 2015). 596 Ibid.

West Fertilizer Company Final Report January 2016 198 U.S. CHEMICAL SAFETY AND HAZARD INVESTIGATION BOARD

identification; ingredient composition; first aid measures; firefighting measures; accidental release measures; handling and storage precautions; exposure controls and personal protection; physical and chemical properties; stability and reactivity properties; toxicological information; ecological concerns; disposal considerations; transport information; regulatory requirements; and other information.597 Facilities must maintain SDSs onsite and submit copies of them (or a list of SDS-covered chemicals) to their SERCs, LEPCs, and local fire departments.598 Facilities covered by Section 311 must also submit Emergency and Hazardous Chemical Inventory forms to their SERCs, LEPCs, and local fire departments annually.599 Facilities provide either a Tier I or Tier II inventory form.600 Tier I inventory form include the following aggregate information for each applicable hazard category: • An estimate (in ranges) of the maximum amount of hazardous chemicals for each category present at the facility at any time during the preceding calendar year. • An estimate (in ranges) of the average daily amount of hazardous chemicals in each category. • The general location of hazardous chemicals in each category.601 The Tier II inventory form contains basically the same information as the Tier I, but it must list the specific chemicals. Tier II inventory form provide the following for each chemical: • The chemical name or the common name as indicated on the SDS. • An estimate (in ranges) of the maximum amount of the chemical present at any time during the preceding calendar year and the average daily amount. • A brief description of the manner of storage of the chemical. • The location of the chemical at the facility. • An indication of whether the owner elects to withhold location information from disclosure to the public.602 Information submitted under Sections 311 and 312 is available to the public from SERCs and LEPCs.603

597 See: https://www.osha.gov/Publications/HazComm_QuickCard_SafetyData.html (accessed on December 29, 2015). OSHA does not enforce the ecological information, disposal considerations, transport information, and regulatory information sections of SDSs because other agencies regulate this information. 598 See: http://www2.epa.gov/sites/production/files/2013-08/documents/epcra_fact_sheet.pdf (accessed on December 29, 2015). 599 Ibid. 600 Ibid. 601 Ibid. 602 Ibid. It is important to note that under Section 312(f), upon request by the fire department with jurisdiction over the facility, owners/operators must provide fire departments with location information. They must also allow fire departments to conduct onsite inspections. 603 Ibid.

West Fertilizer Company Final Report January 2016 199 U.S. CHEMICAL SAFETY AND HAZARD INVESTIGATION BOARD

  1. 5.2 State Emergency Planning in the State of Texas

Texas has suffered some of the worst disasters in U.S. history, both in kind and magnitude. One of the first was the devastating hurricane in Galveston in 1900, which almost destroyed the city and killed thousands. In 1937, in New London, a gas leak explosion destroyed a school and killed approximately 300 students and teachers. Ten years later, the FGAN explosion in Texas City inflicted an enormous loss of life and property that remains unknown to this day; it is ranked as one of the worst industrial accidents in U.S. history.604 As a result of these disasters, Texas enacted statutes to address all-hazard emergency management.605 The Texas Disaster Act of 1975 requires local jurisdictions to designate an emergency management coordinator to develop an emergency operations plan composed of a basic plan with 22 annexes.606 The basic plan and its annexes outline guidance for emergency management activities and assign roles and responsibilities to local agencies.607 Although the basic plan offers general guidance, the annexes provide more detail.608 For example, Annex Q, “Hazardous Materials and Oil Spill Response,” identifies the HAZMAT incidents that could occur in a specific community and how such an incident would likely affect nearby populations.609 Once a hazard is identified, appropriate response actions must be planned, including timely notification, identification of evacuation routes, and assignment of roles and responsibilities.610 Training exercises and drills must also test response effectiveness.611 When Congress enacted EPCRA in 1986, its provisions were incorporated into Texas’s existing emergency planning framework and into state codes.612 The SERC is the Emergency Management Council of Texas and includes participation from multiple state agencies.613 Within that group of agencies, 10 are considered to be SERC members with specific roles in emergency response and planning. For example, the TCEQ is responsible for receiving reports about accidental spills and releases;614 the Texas Department of State Health Services is designated to receive the Tier I or Tier II Emergency and Hazardous Chemical Inventory forms submitted electronically by facilities;615 and the Texas Department of Public Safety, Division of Emergency Management, is tasked with overseeing the

604 Texas Emergency Management Executive Guide (FY 2014 Edition). 605 Ibid. 606 Texas Administrative Code, Title 37, Part 1, Chapter 7. Texas Government Code, Chapter 418. 607 See: Texas Emergency Management Executive Guide (FY 2014 Edition), 4. 608 Ibid. 609 See: McLennan County. Annex Q: Hazardous Materials & Oil Spill Response. Version 2.4, July 2009. 610 See: Texas Emergency Management Executive Guide (FY 2014 Edition), 4. 611 Ibid. 612 Texas Health and Safety Code, Title 6, Subtitle D, “Hazardous Substances,” Chapters 505 through 507. Texas Administrative Code, Title 37, Part 1, Chapter 7. Texas Government Code, Chapter 418. 613 Texas Department of Public Safety. See: https://www.txdps.state.tx.us/dem/stateLocalOrganizations.htm#EMC (accessed on December 29, 2015). 614 See: https://www.tceq.texas.gov/response/spills (accessed on December 29, 2015). 615 This designation has changed since the date of the WFC incident. The Tier II Chemical Reporting Program has moved to the TCEQ. See: https://www.dshs.state.tx.us/tiertwo/ (accessed on December 29, 2015).

West Fertilizer Company Final Report January 2016 200 U.S. CHEMICAL SAFETY AND HAZARD INVESTIGATION BOARD

all-hazard emergency management program and providing guidance and funding for cities, counties, and state agencies so that they can develop their own programs.616 8.5.3 City Emergency Planning in the City of West To fully understand the WFC incident, this section reviews emergency planning and management in West and at the WFC facility. West is located in McLennan County, which is West’s local emergency management district and which formed an LEPC in 1992. The McLennan County LEPC meets four times per year.617 Its members are nominated by the county judge and approved by the SERC.618 The LEPC membership consists of city, industry, hospital, and emergency response officials.619 CSB found that the WFC, however, was not listed on the attendance roster for any LEPC meeting for more than 21 years. As required by both state and federal regulations, the McLennan County LEPC prepared an emergency response plan (ERP) in accordance with guidance from the Texas Department of Public Safety, Division of Emergency Management.620 As discussed previously, this consisted of a basic plan with 22 annexes. It described in part McLennan County’s approach toward emergency planning, response, and notification. McLennan County officials review the plan annually and officially revise or update it every 5 years, as required by Texas law.621 Prior to the WFC incident, McLennan County last formally reviewed its ERP in 2010.622 The McLennan County ERP includes procedures on how to alert the public when natural or human- initiated disasters occur. ERP annexes describe actions to take in various scenarios, such as how to disseminate information quickly,623 how to warn special facilities (e.g., hospitals and schools) and populations of a hazard,624 and how to use alert systems to activate immediate evacuation.625 A vital component of ERPs and ERP annexes is LEPC engagement and communication. Without these, community members might not have the necessary information to respond appropriately to a specific type of incident. For example, on February 12, 2013, WIS was temporarily evacuated because of a controlled burn at the WFC facility. Before the evacuation, the school principal alerted 911 of the fire, but the 911 dispatcher did not acknowledge a coordinated burn. Students and staff were evacuated for approximately 30 minutes to WMS, using coordinated transportation. The WFC did not notify the WISD or WIS in advance that the

616 See: https://www.txdps.state.tx.us/internetforms/Forms/TDEM-10.pdf (accessed on December 29, 2015). 617 McLennan County LEPC Bylaws, Article II, Section 5, “Meetings.” 618 McLennan County LEPC Bylaws, Article II, Section 1, “Membership.” 619 Ibid. 620 State of Texas. Local Emergency Planning Committee (LEPC): A Primer for Local Planning for Hazardous Materials, July 2006. 621 Texas Administrative Code, Title 37, Part 1, Chapter 7, Subchapter B, Rule 7.12. 622 CSB reviewed the 2010 McLennan County ERP for this investigation report. 623 McLennan County Basic Plan, Annex I. 624 McLennan County Basic Plan, Annex E. 625 Ibid.

West Fertilizer Company Final Report January 2016 201 U.S. CHEMICAL SAFETY AND HAZARD INVESTIGATION BOARD

facility was conducting a controlled burn of pallets and brush. After this incident, the WISD asked the emergency service providers and the WFC to provide advance notice of future burning activities. The WFC could have communicated its plans to the WISD or WIS through LEPC activities. The McLennan County ERP specifically includes Annex Q, “Hazardous Material and Oil Spill Response,” which requires identification of all regulated facilities within the county.626 Such facilities are those that are regulated by EPCRA. In particular, a regulated facility is: A plant site where handling/transfer, processing, and/or storage of chemicals is performed. For the purposes of [Annex Q], regulated facilities (1) produce, use, or store EHSs in quantities which exceed threshold planning quantities or (2) hold one or more hazardous chemicals in a quantity greater than 10,000 pounds at any time.627 Because the WFC was regulated by EPCRA, it would follow that Annex Q might list the WFC. However, the WFC was not listed. EPCRA covered the WFC for at least two reasons. First, the WFC stored anhydrous ammonia in quantities that exceeded the anhydrous ammonia TPQ of 500 pounds. Specifically, CSB found that the WFC reported holding 34,000 pounds of anhydrous ammonia at the time of the incident. Clearly, the WFC had onsite sufficient amounts of an EPCRA Section 302 EHS. This triggered not only reporting requirements, but also emergency response planning requirements.628 Thus, the WFC should have been listed in Annex Q for its EPCRA-regulated storage of anhydrous ammonia. Second, the WFC stored FGAN, a hazardous chemical under EPCRA Sections 311 and 312, in quantities that exceeded the AN threshold quantity of 10,000 pounds. In particular, CSB found that the WFC reported 80,000 to 120,000 pounds of FGAN onsite at the time of the incident. As such, the WFC was required to report its quantities of FGAN under EPCRA. CSB obtained WFC Tier II form documents, dated from 2000 to 2012, and found that the WFC annually reported its quantities of anhydrous ammonia to the WVFD, McLennan County LEPC, and Texas Department of State Health Services, but reported its FGAN only in its 2012 Tier II report. Ideally, under the best set of circumstances, the WFC should have been listed in Annex Q for its storage of FGAN. The WFC was not listed in Annex Q, however, due to a misunderstanding of EPCRA’s agricultural use exemption. EPCRA’s agricultural use exemption is a statutory exemption to the definition of “hazardous chemical.” It reads: Hazardous Chemical Defined. For purposes of this section, the term “hazardous chemical” has the meaning given such term by section 1910.1200(c) of title 29 of the Code of Federal

626 McLennan County Basic Plan, Annex Q. 627 Ibid. 628 The WFC was also expected to develop an emergency response plan for its storage of anhydrous ammonia, as required by the Risk Management Program rule. According to EPA, the EPCRA plan and the RMP must be coordinated. See: http://www2.epa.gov/sites/production/files/2013-11/documents/chap-08-final.pdf (accessed on December 29, 2015). However, no evidence indicated that the WFC RMP was shared with the LEPC or the WVFD.

West Fertilizer Company Final Report January 2016 202 U.S. CHEMICAL SAFETY AND HAZARD INVESTIGATION BOARD

Regulations, except that such term does not include the following: . . . Any substance to the extent it is used in routine agricultural operations or is a fertilizer held for sale by a retailer to the ultimate customer.629 It is important to note that this exemption may apply only to Sections 311 and 312 reporting requirements; it does not apply to emergency planning requirements under Section 302. Furthermore, the agricultural use exemption applies directly to the hazardous chemical itself, not the specific individual or entity holding the chemical. That is, the exemption does not relieve an individual or entity of its responsibilities; rather, the individual or entity is exempt from EPCRA reporting requirements if the chemical in question is exempt. Where individuals or entities hold multiple chemicals, each chemical must be assessed individually to determine exemption status. The agricultural use exemption impacts those who use substances in “routine agricultural operations” and retailers who hold substances as fertilizer for sale to the ultimate customer. With respect to those who use substances in routine agricultural operations, CSB referred to guidance on EPA’s website that, in response to a question asking which hazardous chemicals are reportable for farmers under Sections 311 and 312, states: Under Section 311(e)(5), any substance when used in routine agricultural operations is exempt from reporting under Section 311 and 312. This exemption is designed to eliminate the reporting of fertilizers, pesticides, and other chemicals when stored, applied, or otherwise used at the farm facility as part of routine agricultural activities. . . . Thus, the storage and use of a pesticide or fertilizer on a farm would be considered the use of a chemical in routine agricultural operations and is, therefore, exempt under Sections 311 and 312.630 The belief is that minimal risk is involved when farmers use a substance in routine agricultural operations because farmers promptly apply those substances to their crops. Therefore, the exemption eliminates EPCRA reporting requirements under Sections 311 and 312 for at least certain farmers. However, for retailers who hold a substance as fertilizer for sale to the ultimate customer, CSB found that although EPA has published several hypothetical-based questions and answers on its website, it offers little general guidance. CSB discovered that the McLennan County LEPC reported that the WFC’s storage of anhydrous ammonia and FGAN appeared to qualify under EPCRA’s agricultural use exemption, a conclusion which the county stated was also confirmed by the SERC. The WFC’s anhydrous ammonia and FGAN were erroneously considered exempt from both emergency planning and hazardous chemical inventory reporting requirements because of the phrase “fertilizer held for sale by a retailer631 to the ultimate customer” and because the main WFC customers who bought fertilizer were nearby farmers (ultimate

629 EPCRA, Section 311(e)(5). 40 CFR 370.66. 630 See: https://emergencymanagement.zendesk.com/hc/en-us/articles/211416278-What-hazardous-chemicals-are- reportable-for-farmers-under-311-and-312- (accessed on December 29, 2015). It should be noted, however, that although farmers may be exempt under Section 311(e)(5) from reporting these fertilizers in their Sections 311 and 312 reports, they are still required to notify the SERC (or TERC), LEPC (or TEPC), and local fire department under Section 302 if they have an EHS at or above its TPQ. 631 There is no definition of “retailer” under EPCRA.

West Fertilizer Company Final Report January 2016 203 U.S. CHEMICAL SAFETY AND HAZARD INVESTIGATION BOARD

customers / end users). This reason likely explains why the McLennan County LEPC ERP did not include the WFC for its storage of anhydrous ammonia, despite the fact that the exemption does not relieve reporting requirements for EHSs under Section 302. Because the WFC facility not only sold pure fertilizer but also blended chemicals to make fertilizer (e.g., for custom orders), CSB also examined how the agricultural use exemption applies to blends. EPA states that chemicals “held for the purpose of producing fertilizer” are “starting materials used to make a fertilizer,” not the fertilizer itself, so the retailer therefore should report them.632 EPA recognizes, however, that if those chemicals are not blended but rather sold individually to the end customer, then those chemicals are exempt.633 EPA confirmed this position in a September 3, 2010, letter to TFI, stating that the “mixing of fertilizers” must be reported and reiterating that “fertilizer held for sale by a retailer to the ultimate customer . . . is one that is merely held for sale, not one that is mixed or formulated.”634 To bolster its reasoning, EPA further explained: Congress’ intent was to focus Section 311/312 reporting on manufacturers and wholesalers— those are facilities that typically have large quantities of fertilizer, and that use and manufacture a wide range of chemical compounds. Congress appreciated that such manufacturers and wholesalers presented significant risks that needed to be addressed by emergency response authorities, but that mere retailers did not. Assuming arguendo that Congress’ intent is ambiguous, the above interpretation is one that EPA adopts as being the most reasonable interpretation of the statute. Therefore, consistent with the Agency’s prior Q&A guidance, the amount of chemicals intended for blending and the new product should be reported under Section 311 and 312 if the reporting thresholds are exceeded.635 On this basis, facilities that blend chemicals to make fertilizer such as the WFC should not apply the agricultural use exemption to those chemicals meant for blending. However, there is confusion about both who specifically qualifies for the exemption as well as the issue of blending because, although hypothetical-based Q&As are available, limited general EPA guidance exists. Therefore, EPA should develop a general guidance document pertaining to EPCRA’s agricultural use exemption and make a widespread effort to communicate its contents to the fertilizer industry. Since the incident, the Agricultural Retailers Association (ARA), a nonprofit trade association that represents the interests of agricultural retailers and distributors on legislative and regulatory issues, issued an alert to its members on May 14, 2013, warning agricultural retailers that blend (i.e., use nonchemical reactions to mix) dry fertilizers to report those fertilizers on their annual Tier I or Tier II inventory reports submitted to SERCs, LEPCs, and local fire departments. The alert also warned members that EPA has

632 See: https://emergencymanagement.zendesk.com/hc/en-us/articles/212089537-Are-hazardous-chemicals-blended- for-fertilizer-exempted-under-agricultural-use-exemption- (accessed on December 29, 2015). 633 Ibid. 634 Dana S. Tulis, EPA Acting Director Office of Emergency Management. Letter to Chris S. Leason, counsel to TFI, September 3, 2010. 635 Ibid.

West Fertilizer Company Final Report January 2016 204 U.S. CHEMICAL SAFETY AND HAZARD INVESTIGATION BOARD

cited agricultural retailers for incomplete inventory forms.636 TFI further noted in a verbal statement on November 15, 2013, at the Washington, DC, “Listening Session Regarding President Obama’s Executive Order Improving Chemical Facility Safety and Security”: As most of you know, there is a fertilizer retail exclusion for reporting under EPCRA. TFI supports removal of this exclusion. We feel everyone should report hazardous chemicals stored on site to the LEPC and SERC and work with local fire departments without exception.637 Despite these post-incident efforts, the ARA and TFI cover only some of the thousands of FGAN facilities in the United States. Consequently, EPA should take steps to ensure that fertilizer facilities fully comply with EPCRA and do not mistakenly apply the agricultural use exemption. In fact, EPA already hosted, from May to September 2014, 32 workshops for members of Local Emergency Planning Committees, which were held in Texas, Arkansas, Louisiana, Oklahoma, and New Mexico and attended by 1,340 representatives from local, state, and federal government as well as industry.638 It also recently released an online training module of key requirements for SERCs and LEPCs and a factsheet, “How to Better Prepare Your Community for a Chemical Emergency: A Guide for State, Tribal, and Local Agencies.”639 While these efforts demonstrate progress, CSB believes the development of more general EPCRA guidance, as well as a guidance document on the agricultural use exemption, could help significantly improve emergency planning at all levels. 8.5.4 Other Emergency Planning Requirements During the course of its investigation, CSB also found issues in emergency planning related to FGAN training and compliance with OSHA’s Hazardous Waste Operations and Emergency Response (HAZWOPER) standard (29 CFR 1910.120). CSB determined that employees at the WFC had limited training on FGAN hazards. The agency learned through interviews that some WFC employees were unaware that the FGAN fertilizer stored onsite could explode. Many said the April 1995 Oklahoma City bombing was the only basis of their knowledge of this. Nonetheless, WFC employees generally understood FGAN security regulations so as to verify that customers buying FGAN were registered and were using it only for agricultural purposes. CSB found that the lack of formal training at the WFC was a central reason why employees were largely unaware of FGAN hazards. Some WFC employees recalled having discussions about avoiding FGAN contact with heat, fire, and moisture. However, CSB concluded that FGAN safety training was inconsistent and that no formal training addressed FGAN hazards or required discussion of the FGAN SDS. WFC employees also lacked formal training on the facility’s ERP for anhydrous ammonia. Employees informally shared information

636 Unfortunately, the alert, even if made before the date of the incident, would have had little impact on the WFC because the facility was not a member of the ARA. 637 See: http://www.tfi.org/media-center/news-releases/tfis-verbal-statement-presented-nov-15-washington-dc- listening-session-re (accessed on December 29, 2015). 638 See: https://www.osha.gov/chemicalexecutiveorder/EO13650FS-ImprovingChemicalFacilitySafety.pdf (accessed on December 29, 2015). 639 Ibid.

West Fertilizer Company Final Report January 2016 205 U.S. CHEMICAL SAFETY AND HAZARD INVESTIGATION BOARD

so that they knew to evacuate as far as possible if such a release occurred. They also knew which emergency numbers to call. However, much of the WFC employee training was hands on and job specific. Thus, a lack of comprehensive emergency planning and response training played a role in how the incident unfolded. In addition, CSB discovered issues with OSHA’s HAZWOPER standard, which too is an integral element of emergency planning. Under the HAZWOPER standard, the WFC was required to develop an ERP for all “hazardous substances.” As defined by the standard, hazardous substances include those covered by EPA or DOT.640 FGAN meets this definition because it is listed in DOT’s Hazardous Materials Table.641 The WFC was therefore required to develop a HAZWOPER ERP, or would be considered exempt if it met another OSHA standard, Emergency Actions Plans (29 CFR 1910.38).642 The HAZWOPER ERP should have addressed pre-emergency planning and coordination with outside parties, personnel roles, lines of authority, training and communication, emergency recognition and prevention, safe distances and places of refuge, site security and control, evacuation routes and procedures, decontamination, and emergency medical treatment and first aid.643 However, no evidence indicated that the WFC developed the HAZWOPER ERP or was considered exempt under the Emergency Action Plans standard for FGAN. Consequently, OSHA cited the WFC after the incident for not providing an FGAN-related HAZWOPER ERP. 8.6 Fire Protection Codes and Standards Fire protection codes and standards generally refer to the most recently developed practices to protect people and property from fire and natural disasters. When adopted by states or local jurisdictions, codes (including building, electrical, plumbing, mechanical, and other codes) represent mandatory regulations. Standards, on the other hand, provide methods to achieve compliance with codes. Both codes and standards must be adopted through some process, usually state-level fire or building codes. The legislature must enact that adoption before a fire protection (or prevention) code or standard applies. Because fire and building codes may also include references to many standards, such standards are generally not adopted separately but instead are included once the fire or building code is adopted. Fire codes specify practices that must be followed; that is, codes are mandatory only if adopted. In contrast, fire protection standards typically refer to practices that, despite their mandatory language, are voluntary unless adopted into law (e.g., as a state fire code). The nation’s leading fire protection codes and standards are issued by the NFPA and the International Code Council (ICC). Both employ a public consensus process to produce model codes and standards that jurisdictions can adopt into law. The NFPA updated its current code for FGAN, NFPA 400 (Hazardous Materials Code) Chapter 11, after the WFC

640 29 CFR 1910(a)(3). 641 49 CFR 172.101. 642 29 CFR 1910.120(q)(1). 643 29 CFR 1910.120(q)(2).

West Fertilizer Company Final Report January 2016 206 U.S. CHEMICAL SAFETY AND HAZARD INVESTIGATION BOARD

incident to address the conditions that likely led to the FGAN detonation. The ICC’s International Fire Code (IFC) also addresses storage and handling of oxidizing materials. Texas does not have a state-wide fire code and as a result, most fire departments in the state have no authority to inspect facilities against, or compel them to follow the safe practices outline in these codes, unless a fire code is adopted at the county or city level. In July 2015, the Texas Department of Insurance did adopt NFPA 1 (Fire Code) for inspections by the Texas State Fire Marshal’s office on the complaint of any person. However, even if fire protection standards are incorporated into state and local fire codes, catastrophic incidents can occur when such standards are deficient. CSB reviewed the ICC IFC and NFPA 1 (Fire Code). The IFC is in use or adopted in 42 states,644 and NFPA 1 is adopted statewide in 19 states. CSB also researched fire protection codes on the state, county, and city levels—specifically, in the state of Texas, in McLennan County, and in the city of West. The first part of this section describes the NFPA, with details on the NFPA standard for FGAN. The second part of this section describes the ICC, with details on how it addresses HAZMAT. The third and last part of this section describes fire code regimes on a more local level and analyzes codes in Texas, which can be improved to better protect emergency responders and the public from fire events. 8.6.1 National Fire Protection Association The NFPA is an international nonprofit organization that develops and publishes industry consensus codes and standards, guides, and recommended practices associated with fire prevention and related hazards. Companies can voluntarily comply with NFPA codes and standards or can be required to follow a standard if it is adopted by reference in local, state, or federal laws (e.g., in a local or state fire code). Many of the NFPA codes and standards are also incorporated in OSHA regulations. The EPA Risk Management Program rule and OSHA PSM standard regulations require owners and operators of covered facilities to ensure that facility processes are designed to comply with RAGAGEP, which can include NFPA codes and standards. However, if these consensus codes and standards are deficient, they can lead to insufficient protections. 8.6.1.1 NFPA Code for FGAN AN requirements were first covered by NFPA 490 (Storage of Ammonium Nitrate), which was adopted in

  1. In 2010, NFPA withdrew NFPA 490 when it was incorporated into NFPA 400 (Hazardous

Materials Code). NFPA 400 establishes provisions for the storage, use, and handling of a number of hazardous substances, using four broad categories addressing building construction, storage requirements, fire protection systems, and general protections against fire. The 2013 edition had been published and was in effect at the time of the incident. The code has a specific chapter on AN (Chapter 11, “Ammonium Nitrate Solids and Liquids”). This distinguishes AN from other chapters because other chapters of the code are organized by chemical

644 The IFC is also adopted in the District of Columbia, NYC, Guam and Puerto Rico.

West Fertilizer Company Final Report January 2016 207 U.S. CHEMICAL SAFETY AND HAZARD INVESTIGATION BOARD

properties (such as “oxidizers” or “unstable or water reactive materials”) that can each apply to several chemicals. The scope of Chapter 11 covers “the storage, use, and handling of solid or liquid AN” in quantities exceeding 1,000 pounds. The chapter does not include FGAN manufacturing operations or the composition of FGAN designated as DOT hazard Class 1 explosives. The NFPA 400 code includes provisions for indoor and outdoor storage, fire protection systems, and general use; annexes offer additional guidance. In addition, the maximum allowable quantity (MAQ) designation is used in building and fire codes when addressing the storage, handling, and use of HAZMAT. The MAQ is integral to the NFPA 400 approach. It includes provisions for classifying materials, determining their MAQs, and adding other protective features if the intention is to use greater quantities of material. When evaluating the provisions in NFPA 400 (2013 Edition) against the factors that likely contributed to the WFC incident, CSB found code deficiencies concerning scope, building design, storage practices, and fire prevention and firefighting response for facilities that store bulk FGAN. However, it is important to note that the WFC would not have been required to comply with the code at the time of the incident unless the authority having jurisdiction enforced it retroactively. The WFC facility was constructed in 1962, so the requirements of NFPA 400 did not apply. Nonetheless, in response to some of the lessons learned from the WFC incident, CSB and other agencies and organizations participated in meetings with the NFPA Technical Committee on Hazardous Chemicals to provide input on the next revision of NFPA 400 (2016 Edition). A significant effort of the NFPA Technical Committee focused on addressing the requirements for existing FGAN storage facilities covered under NFPA 400 because the previous editions had primarily covered requirements for new facilities.645 As discussed, the wood construction of the WFC warehouse and bins that stored FGAN not only assisted in the rapid spread of the fire but also increased the sensitivity of the material that led to the detonation. In addition, the WFC warehouse had no installed fire detection or suppression systems, allowing the fire to spread through the building. If a building fire detection system had been operational, the early stages of the fire possibly could have been extinguished. Furthermore, sprinklers could have extinguished the fire before it could heat the FGAN pile sufficiently to produce a detonation. Similar to the OSHA Explosives and Blasting Agents standard, NFPA 400 (2013 Edition) allowed wood and combustible construction materials for bulk storage bins for FGAN as long as the bins were “protected against impregnation by FGAN.” The code noted in an annex that sodium silicate, epoxy coatings, or polyvinyl chloride (PVC) coatings were acceptable means to achieve this protection. However, the method used to coat the wood to resist FGAN impregnation does not prevent a fire. The presence of combustibles during a fire can create explosive conditions within a building that stores bulk FGAN. NFPA 400 (2016 Edition) now prohibits the use of combustible materials for all construction and bins at new facilities, even when coatings are applied to protect against FGAN impregnation.

645 Pearce, Nancy. “Safer Storage.” NFPA Journal, May 1, 2015.

West Fertilizer Company Final Report January 2016 208 U.S. CHEMICAL SAFETY AND HAZARD INVESTIGATION BOARD

However, the 2016 revisions to NFPA 400 do not apply the same requirements to prohibit combustible construction at existing facilities. The NFPA was challenged to reasonably specify construction requirements for facilities with combustible construction, which comprise the majority of FGAN storage facilities.646 To address existing facilities, NFPA 400 (2016 Edition) contains the new Section 11.1.5, “Protection of Existing Buildings.” This includes requirements that apply retroactively, where adopted, for existing buildings with combustible content. Facilities are required to install automatic fire sprinkler and detection systems. Activation of the fire detection system must automatically initiate an audible and visual alarm at the facility as well as a public notification or alert system to warn individuals located within one mile of the facility that they need to evacuate. Another shortcoming of NFPA 400 (2013 Edition) lies in Annex E, “Properties and Uses of Ammonium Nitrate and Fire-Fighting Procedures,” which called for large volumes of water to be applied as quickly as possible unless the fire reached “massive and uncontrollable proportions,” when responders were advised to evacuate and withdraw to a safe location. CSB found this guidance to be vague because the user had to determine when to categorize a fire as “massive and uncontrollable” and when to make the decision to evacuate rather than attempt to extinguish the fire. Because of FGAN’s unpredictable nature, immediate evacuation should be the first action for responders, using a minimum evacuation distance calculated in advance based on the quantity of FGAN stored. The 2013 edition of NFPA 400 did not require pre- planning, but given the events that unfolded during the WFC response, firefighters should also have a pre- incident plan to facilitate quick and effective decision making when responding to an FGAN fire. NFPA 400 (2016 Edition) now requires new and existing facilities to have emergency action plans that clearly state that “fire potentially affecting FGAN storage beyond the initial (incipient) stage shall not be approached by facility personnel.”647 The emergency plan must also specify whether the FGAN storage facility has a sprinkler system and whether it is constructed of combustible materials. For new facilities, the plan must establish a safe evacuation distance based on an approved648 analysis of potential offsite consequences. If no analysis has been performed, a distance of one mile should be used. The revised Annex E of NFPA 400 (2016 Edition) offers additional guidance to firefighters, including information on the conditions that cause FGAN explosions. The guidance states that only incipient fires in FGAN storage areas (or in vehicles transporting FGAN) should be attacked by using manual fire extinguishing methods that require a human operator.649 Firefighters should withdraw to a safe distance and allow the structural fire to burn to completion once it progresses beyond the incipient stage.650

646 Ibid. 647 NFPA. NFPA 400: Hazardous Materials Code, 2016 Edition. Quincy, MA: NFPA, 2016. 648 Plan approvals are performed by the authority having jurisdiction, such as the fire department or fire marshal. 649 NFPA. NFPA 400: Hazardous Materials Code, Annex E, 2016 Edition. Quincy, MA: NFPA, 2016. 650 NFPA 400 (2016 Edition) states that “responses to incipient releases of hazardous materials where the material can be absorbed, neutralized, or otherwise controlled at the time of release by employees in the immediate release area, or by maintenance personnel, shall not be considered emergency responses as defined within the scope of this code.”

West Fertilizer Company Final Report January 2016 209 U.S. CHEMICAL SAFETY AND HAZARD INVESTIGATION BOARD

Following the WFC incident, the NFPA-sponsored Fire Protection Research Foundation651 (the Foundation) conducted a study652 to determine the adequacy of the separation distances prescribed for hazardous materials in NFPA 400, with a greater focus on FGAN. NFPA 400 specifies separation and clearance distances for newly constructed hazardous chemical storage from other on-site equipment and occupied buildings. The Foundation’s technical committee was made up of industry representatives, and research and engineering organizations that conducted literature reviews of existing methodologies to determine safe separation distances and testing to characterize the effect of AN detonations on personnel and processes near an explosive event. The study included reviews of various sources for risk-based and consequence- based methodologies for determining the safe distances as well as established distance tables. To study the adequacy of the existing separation distances in NFPA 400, the Foundation commissioned explosive testing to characterize the effects of nearby processes and personnel using a 3,000 pound ANFO donor charge to simulate an explosion. As part of the analysis, blast consultants compared the blast pressures and data recorded at various distances from the donor charge and compared the effects to the recommended distances for Class 3 Oxidizers in detached unsprinklered storage prescribed in NFPA 400 Chapter 15 (Oxidizer Solids and Liquids). The study concluded that the process-to-process separation distances for solid AN may be inadequate to provide protection against blast effects, but the process-to-personnel separation distances may be acceptable if personnel are inside buildings located at prescribed distances. However, the study concluded that additional testing and analysis is necessary to validate the absolute safety of personnel based on variations in processes, design, and potential reactants. The purpose of the project was to provide guidance to the NFPA technical committee for the development of technically-based separation distances for storage. Thus, the Foundation recommends a technical- based approach to establish safe separation distances that takes into account the risks associated with a known material and process, as well as the potential consequences of a catastrophic event involving that material. 8.6.2 International Code Council Like the NFPA, the ICC is an international nonprofit organization that develops and publishes consensus codes and standards. In addition to publishing the IFC, the ICC also produces the International Building Code (IBC), which is in use or adopted in 50 states. Jurisdictions can adopt the model codes by reference. The ICC views its codes as “companion” documents that work across disciplines (e.g., building construction, fire protection, mechanical systems, plumbing, zoning). Thus, a regulation for HAZMAT storage will affect building code requirements for construction, mechanical code requirements for

651 The Fire Protection Research Foundation is an affiliate of NFPA and plans, manages, and communicates research on fire safety issues in collaboration with academics, laboratories, and industry. 652 See: http://www.nfpa.org/Assets/files/AboutTheCodes/59A/RFSeparationDistancesNFPACodesAndStandards.pdf (accessed on December 30, 2015).

West Fertilizer Company Final Report January 2016 210 U.S. CHEMICAL SAFETY AND HAZARD INVESTIGATION BOARD

ventilation, plumbing code requirements for drainage, and fire code requirements for operations and handling. The codes are cross-referenced for ease of use. The ICC requirements for protecting AN from fire exposure and explosion are based on material properties, quantities stored, and storage and handling conditions. The ICC defines storage as “the keeping, retention or leaving of hazardous materials in closed containers, tanks, cylinders, or similar vessels; or vessels supplying operations through closed connections to the vessel.”653 Therefore, despite common references to the WFC FGAN as “in storage,” the IFC would interpret this application as “handling,” which it defines as “the deliberate transport by any means to a point of storage or use,” or as “use,” which it defines as “placing a material into action, including solids, liquids and gases.”654 The IFC does not have a separate chapter for AN. The IFC refers to NFPA 400 when AN intended for explosive materials is stored, handled, or used. Otherwise, AN is treated as an oxidizing agent, subject to the general requirements for each oxidizer class in IFC Chapter 63 (Oxidizers, Oxidizing Gases and Oxidizing Cryogenic Fluids) and Chapter 50 (Hazardous Materials). 8.6.3 State Fire Codes Without a comprehensive federal standard, states must rely on their own regulations to oversee HAZMAT storage. Most states have enacted fire codes or have adopted model fire codes. These codes typically include HAZMAT storage and emergency planning provisions. However, at the time of the incident, Texas had no state fire code, and the state still has no such code as of publication of this report. The majority of states have adopted model fire codes through referencing them into law.655 Two recognized model fire codes are the IFC and NFPA 1. Both establish minimum requirements for fire prevention and protection systems. Some states and municipalities have developed their own fire codes, using model codes as a guide. New York City updated its fire code in December 2007, marking its first major revision since 1913.656 After investigating an industrial waste explosion and fire in 2001 in the Chelsea district of Manhattan, CSB issued a recommendation to the Mayor and City Council to better address HAZMAT.657 The city developed its own code, borrowing heavily from the IFC (2003 Edition) but requiring some more stringent provisions. States could potentially apply other IFC chapters for storing bulk FGAN. For example, IFC Chapter 63 (Oxidizers, Oxidizing Gases and Oxidizing Cryogenic Fluids) includes provisions for storage and use of oxidizing materials, such as FGAN. This chapter says that indoor storage of oxidizers should be located in a detached building with an automatic sprinkler system and smoke detection systems. Additional

653 ICC. Chapter 50, Section 5002.1. International Fire Code, 2015 Edition. Washington, DC: ICC, 2015. 654 Ibid. 655 ICC. “International Code Adoption.” International Fire Code. Washington, DC: ICC, 2014. See: http://www.iccsafe.org/gr/Pages/adoptions.aspx (accessed on November 6, 2014). 656 Cassono, Salvatore. “A New Fire Code for New York City.” Building Safety Journal (July–August 2008). 657 CSB. “Chemical Waste-Mixing Incident: Kaltech Industries Group, Inc.” CSB Investigation Report, April 25, 2002.

West Fertilizer Company Final Report January 2016 211 U.S. CHEMICAL SAFETY AND HAZARD INVESTIGATION BOARD

requirements for storage configuration, separation barriers, and explosion control depend on the class of oxidizer, of which the IFC names four. NFPA 1 includes similar requirements for oxidizers in Chapter 70 (Oxidizer Solids and Liquids). This chapter directs users to follow NFPA 400, which also incorporates similar building and fire protection requirements for indoor storage of oxidizers. The WFC did not voluntarily implement any of the provisions from the oxidizer chapters of the IFC or NFPA 1, nor were they required to do so by the authority having jurisdiction. The WFC did not install an automatic sprinkler or smoke detection system in the fertilizer warehouse, nor did it store its FGAN in a separate building, away from combustibles. The location where the fire originated was adjacent to the FGAN bin, and no fire-rated wall separated the rooms. The WFC was not subject to code provisions because none of the relevant jurisdictions—not the state of Texas, McLennan County, or the city of West—had adopted a fire code. Texas affords counties and municipalities the discretion to adopt or develop fire codes. However, state law limits which counties can adopt such codes. Only a county with a population of more than 250,000 (and counties adjacent to a county with a population of more than 250,000) may adopt a fire code. Moreover, even if such a county does adopt a fire code, that code applies only to the unincorporated areas of the county. Cities within the county can adopt the county fire code, not adopt a fire code, or develop their own fire codes. Adoption of a city fire code does not affect any unincorporated areas outside the city. Although many major Texas cities have adopted fire codes, the pattern is inconsistent. As of September 2014, 43 facilities stored FGAN in 36 Texas counties. Only one of those 36 counties has a population of more than 250,000 people,658 and only six of those counties are adjacent to counties with populations that equal or exceed 250,000. Consequently, 79 percent of the 43 FGAN storage facilities are located in Texas jurisdictions that, under state law, cannot adopt a fire code. According to the 2010 census, the population of McLennan County was 241,281. Thus, the county fell below the population threshold. However, one of the seven adjacent counties had a population of more than 250,000. Accordingly, McLennan County had the authority to adopt a fire code, but this was not required. It is also important to note that the WFC facility was only partially within city limits. The fertilizer warehouse was located in an unincorporated area of West. If McLennan County had adopted a fire code, it would have applied to the WFC fertilizer warehouse only. Furthermore, if West had decided to adopt its own fire code, it would have applied to the entire WFC facility except for the warehouse. Although efforts have been made to make a state fire code in Texas mandatory, such endeavors have not been successful. The Texas Legislature debated the issue of adopting a state fire code at least as far back as 1978. Legislative committee reports between 1978 and 1984 from the Texas House of Representatives and the Texas State Senate identified the severe fire problem, and one report contended that the losses from fires exceeded “loss of life and property” from “all natural disasters combined” in the state.659 After

658 U.S. Census Bureau. 2010 U.S. Census. Washington, DC: U.S. Census Bureau, 2011. 659 Texas House of Representatives Committee on Business and Industry. “Interim Report,” October 13, 1978.

West Fertilizer Company Final Report January 2016 212 U.S. CHEMICAL SAFETY AND HAZARD INVESTIGATION BOARD

hearing multiple testimonies in public hearings across the state, a committee report concluded that Texas was “one of the leading states in property loss and lives lost because of fire.”660 This same committee report also found that such major losses occurred not in the most populated municipalities that had adopted fire and building codes, but in the unincorporated areas where fire codes did not apply.661 It stated that unincorporated areas were particularly problematic when annexed into a municipality because the city assumed responsibility for fire-prone buildings that were not built to code specifications.662 Because growth areas in counties are inevitable targets for municipal annexation, if counties are not granted proper regulatory authority, cities inevitably inherit the problems thus created. The Texas legislative committee reports also identified that without a state fire code, the State Fire Marshal cannot fulfill the duty of minimizing fire risks. One report noted that the State Fire Marshal has no authority to adopt a fire code, despite holding responsibility for the inspection of state-owned and state-leased buildings. Without a code, the State Fire Marshal is unable to set criteria to assess a fire hazard and enforce corrective actions. Moreover, although the local fire marshals hold authority to inspect facilities in their jurisdictions, without a fire code, they cannot enforce safety measures that are not legally required. The Texas Fire Protection Standard Committee, a special interim legislative committee, studied the fire problem and issued an interim report to the 69th session of the Texas Legislature in December 1984.663 This committee confirmed many of the findings above.664 In addition, the committee analyzed NFPA national fire data from 1978 to 1982.665 These data indicated that the per capita number of fires, deaths, and injuries and the dollar loss resulting from fire were all lower in states with fire codes than in those without them.666 The data also suggested that education alone to minimize human errors was insufficient to reduce fire loss because fire causation was mostly attributable to improper structural design and equipment malfunction.667 This committee also received extensive testimony from around the state indicating that the loss of life in the volunteer firefighter service was primarily “because there were no codes.”668 Over the years, proposed bills in the Texas Legislature for adoption of a fire code failed to gain support. In 1977, the Texas House of Representatives addressed a proposed bill to enforce a “fire prevention code” that would apply only to unincorporated areas and would be enforced by the state and county fire

660 Texas Senate Subcommittee on Consumer Affairs. “Final Staff Recommendations,” December 1980. 661 Ibid. 662 Ibid. 663 Texas Fire Protection Standards Committee. “Interim Report to the 69th Texas Legislature.” December 1984. 664 Ibid. 665 Ibid. 666 Ibid. It was noted in the report that the fire loss data had limitations because mandatory reporting requirements were not consistent throughout the nation. This limited statistical analysis nonetheless pointed out principal causes of fires. 667 Ibid. 668 Ibid.

West Fertilizer Company Final Report January 2016 213 U.S. CHEMICAL SAFETY AND HAZARD INVESTIGATION BOARD

marshals.669 In 1997, 20 years later, another proposed Texas House bill sought adoption of a code that would apply to (1) buildings located in unincorporated areas that have not adopted a fire code, (2) municipalities that did not adopt a fire code, (3) public assembly buildings in municipalities that have not adopted either model code, and (4) state-owned buildings.670 Neither bill progressed out of committee. In 1989, the Texas Legislature granted limited authority to counties with a population of 250,000 or more to adopt and enforce a fire code.671 This authority was later amended in 1997 to address growing populations and include counties adjacent to those with a population of at least 250,000.672 The failure to mandate a statewide fire code left some counties such as McLennan County without minimum fire protection measures. The absence of a state-wide fire code and the local population restrictions for code adoption remain an important issue for CSB. However, since the WFC incident, Texas has amended the administrative code to provide the State Fire Marshal with greater authority to enforce some NFPA codes at FGAN storage facilities, as well as to enter, upon complaint, and inspect facilities against the provisions of NFPA 1. Though the adoption did not create a state-wide fire code, it allows for the State Fire Marshal to inspect against a more comprehensive standard than NFPA 101 (Life Safety Code) that Texas previously adopted.673 Additional changes to the Texas State Fire Marshal’s authority to inspect FGAN facilities were enacted as part of House Bill 942 (described in Section 8.7.2). In addition, the Texas Agriculture Code was amended to impose additional requirements on FGAN retailers (described in Section 8.7.1). 8.7 Post-Incident State and Local Regulatory Developments Since the 2013 WFC incident, state and local legislators in Texas have attempted to improve FGAN safety through regulatory change. These efforts represent important first steps in recognizing the potential catastrophic hazards of FGAN under certain conditions. However, they are not entirely adequate. For example, when Texas House Bill (HB) 942 became law, it simply codified existing state hazardous chemical reporting requirements. Also, although the revised Texas Commercial Fertilizer Rules establish requirements for FGAN to be separated by at least 30 feet from combustible and flammable materials,674 this requirement is much less restrictive than the newly revised NFPA 400

669 65th Texas Legislative Session. House Bill (HB) 325, “An act relating to the promulgation and enforcement of a state fire prevention code for unincorporated areas of the state by the State Board of Insurance.” 670 75th Texas Legislative Session. HB 2922, “An act relating to a statewide building and fire code.” 671 71st Texas Legislative Session. HB 2252, “An act relating to the authority of the commissioners courts of certain counties to adopt a fire code for certain buildings in unincorporated areas.” 672 75th Texas Legislative Session. State Bill (SB) 10, “An act relating to the authority of certain counties to adopt and enforce a fire code.” 673 See: https://texreg.sos.state.tx.us/public/readtac$ext.TacPage?sl=R&app=9&p_dir=&p_rloc=&p_tloc=&p_ploc=&pg=1 &p_tac=&ti=28&pt=1&ch=34&rl=303 (accessed on December 30, 2015). 674 Texas Administrative Code, Title 4, Chapter 65, Section 65.6(d)(3). See: http://otscweb.tamu.edu/Laws/PDF/CommercialFertilizerRules.pdf (accessed on December 29, 2015).

West Fertilizer Company Final Report January 2016 214 U.S. CHEMICAL SAFETY AND HAZARD INVESTIGATION BOARD

standard and might not fully eliminate the risk of molten FGAN contamination during a fire. This section includes a discussion of the Texas Commercial Fertilizer Rules, a general analysis of HB 942 as well as a comparison of HB 942 to other legislation pending in committee as of this report’s publication date, and a review of an Athens, Texas, ordinance that mandates a ban on the bulk storage of FGAN. 8.7.1 Texas Commercial Fertilizer Rules The Office of the Texas State Chemist (OTSC) regulates the sale of FGAN and FGAN-containing materials. Enacted by 2007 amendments to the Texas Agricultural Code Section 65.6, the law places limits on FGAN sales. It establishes requirements for registration certificates issued by the Texas Feed and Fertilizer Control Service as a condition of selling (or offering to sell) FGAN.675 To reduce theft or terrorism, the requirements focus on security measures for FGAN storage and on recordkeeping to identify people who purchase FGAN. In June 2014, Texas revised the provisions of its Commercial Fertilizer Rules.676 The revised rules require FGAN facilities to file Top-Screen information under the federal CFATS rule as well as EPCRA Tier II information with the Texas Department of State Health Services as a condition for receiving an annual certificate of registration to sell FGAN. The 2014 revisions also require OTSC to inspect FGAN storage areas. Such inspections are to confirm that combustible and flammable materials, such as potential sources of ignition—fuels, oils, hay, or other organic materials—are separated from FGAN by at least 30 feet. If facilities do not comply with these requirements, OTSC can deny, suspend, or revoke annual certificates to sell (or offer to sell) FGAN. 8.7.2 Texas House Bill 942 The summary of Texas HB 942 says that it is an “act relating to the storage of certain hazardous chemicals; transferring enforcement of certain reporting requirements, including the imposition of criminal, civil, and administrative penalties, from the Department of State Health Services to the Texas Commission on Environmental Quality.” It became law on June16, 2015.677 The law bars facilities from storing FGAN with any nonfertilizer materials, requires that FGAN be stored at least 30 feet away from combustible materials, moves FGAN regulation from the Department of State Health Services to the TCEQ, allows the State Fire Marshal to inspect FGAN facilities, gives fire departments access for pre-fire planning assessments, and requires correction of hazardous conditions within 10 days.678 Although this law is an effort by state legislators to better regulate FGAN, it is not entirely adequate. For example, the requirement that FGAN storage be at least 30 feet from combustible materials was already required by the Texas Commercial Fertilizer Rules, as amended in June 2014 (and discussed in Section

675 See: http://www.tlc.state.tx.us/pubssoe/80soe/80soe.pdf (accessed on December 29, 2015). 676 See: http://otscweb.tamu.edu/Risk/AmNitrate/PDF/AN-Compliance-Guide.pdf (accessed on December 29, 2015). 677 Ibid. 678 See: http://kwbu.org/post/abbott-signs-bill-tackles-ammonium-nitrate-storage (accessed on December 29, 2015).

West Fertilizer Company Final Report January 2016 215 U.S. CHEMICAL SAFETY AND HAZARD INVESTIGATION BOARD

  1. 7.1), a year before HB 942 became law. During a May 2015 meeting of the Texas Senate Committee

on Natural Resources and Economic Development, Senator Brian Birdwell, who sponsored the bill, affirmed this fact. He said, “To be clear this is not a new regulatory scheme. HB 942 simply codifies existing regulations regarding reporting of hazardous chemicals. These are existing regulations which 100 percent of FGAN storage facilities in this state [must currently comply with].”679 A related bill, HB 417, would impose penalties for improper FGAN storage and would create rulemaking authority over FGAN facilities.680 The bill states, “The commissioner of insurance, after consultation with the state fire marshal, by rule shall adopt fire protection standards for FGAN storage facilities, including standards for the storage of FGAN at those facilities.”681 State Representative Joe Pickett, the author of HB 417, told the Texas House Committee on Environmental Regulation in April 2015 that “the rulemaking authority is a way to make changes without the Legislature being in session,” explaining that the Commissioner of Insurance would work with state agencies.682 This regulatory authority distinguishes HB 417 from HB 942. Although HB 417 does not necessarily establish new regulations, it gives the Commissioner of Insurance an opportunity to do so. As of December 2015, however, this bill remains pending in committee.683 8.7.3 Athens City Ordinance After the May 29, 2014, FGAN-related fire at the East Texas Ag Supply facility in Athens, Texas (discussed in Section 7.4), the city of Athens initiated efforts to prevent similar events. On May 29, 2015, Athens passed an ordinance that banned bulk storage of FGAN and anhydrous ammonia.684 The ordinance (No. O-24-14) states in simple terms, “Commercial Fertilizer Storage or Manufacturing Facilities used to produce, transfer, store, or offer for sale Bulk FGAN, Bulk FGAN Material and/or Anhydrous Ammonia shall not be allowed in any zoning district in the City.” A “commercial fertilizer storage or manufacturing facility” is defined as one that “stores, mixes, or manufactures 10,000 or more pounds of FGAN and/or anhydrous ammonia and/or is required to register with the Texas Feed and Fertilizer Control Service.” The ordinance also streamlines chemical reporting and allows volunteer fire departments to inspect facilities.685 However, this ordinance does not apply retroactively to the facilities that existed when the ordinance was enacted.

679 Ibid. 680 See: http://www.texastribune.org/2015/04/07/proposed-bill-aims-prevent-another-fertilizer-blas/ (accessed on December 29, 2015). 681 Texas HB 417, “An act relating to information regarding the storage of certain hazardous chemicals; providing penalties.” 682 See: http://www.texastribune.org/2015/04/07/proposed-bill-aims-prevent-another-fertilizer-blas/ (accessed on December 29, 2015). 683 See: http://txlege.texastribune.org/84/bills/HB417/ (accessed on December 29, 2015). 684 See: http://www.kltv.com/story/29192400/one-year-after-fire-city-of-athens-state-make-changes-in-ammonium- nitrate-storage (accessed on December 29, 2015). 685 Ibid.

West Fertilizer Company Final Report January 2016 216 U.S. CHEMICAL SAFETY AND HAZARD INVESTIGATION BOARD

  1. 8 Industry Standards

Since the WFC incident, the fertilizer industry has implemented initiatives to prevent such an incident from reoccurring. In February 2014, TFI and the ARA, two primary agricultural trade associations, developed and issued Safety and Security Guidelines for the Storage and Transportation of Fertilizer Grade Ammonium Nitrate at Fertilizer Retail Facilities (or Safety and Security Guidelines).686 This public document explains the OSHA Explosives and Blasting Agents standard, but also provides more specific guidance. In March 2014, TFI and the ARA initiated an FGAN stewardship program. Participation involves a voluntary assessment every three years of facility safety and security, focusing on FGAN and anhydrous ammonia. 8.8.1 The Fertilizer Institute (TFI) TFI is a major trade association for the fertilizer industry.687 TFI members include BP Energy Company, Dow AgroSciences, DuPont Sulfur Products, JP Morgan, Mitsubishi International Corporation, Shell Sulphur Solutions, and Union Pacific Railroad.688 TFI lists security, energy, the environment, and worker health and safety as concerns to its members.689 It also lists product safety stewardship as one of its key issues.690 TFI offers tools to enhance the safety and security of products and equipment (discussed in Appendix E) across the supply chain.691 Post-WFC incident tools include the Compliance Assessment Tool, the Safety and Security Guidelines, and the ResponsibleAg program. Each of these is discussed in the next sections. 8.8.1.1 Compliance Assessment Tool The Asmark Institute, a private not-for-profit educational organization that is a resource center for the agricultural retail industry, developed the web-based Compliance Assessment Tool.692 With regulatory compliance consistently cited during the last 18 years as one of the top 10 threats to the long-term viability of agricultural retail facilities, the Compliance Assessment Tool is meant to assist the agricultural retail industry.693 This tool helps personnel at facilities, terminals, warehouses, and farm equipment dealers in identifying the regulations that apply to their specific sites. 694 The Compliance Assessment Tool evaluates onsite compliance efforts.695 Through accessing the website, entering facility

686 ARA, TFI. “Safety and Security Guidelines for the Storage and Transportation of Fertilizer Grade Ammonium Nitrate at Fertilizer Retail Facilities,” February 2014. 687 See: http://www.tfi.org/about (accessed on December 29, 2015). 688 See: http://www.tfi.org/about/membership-list (accessed on December 29, 2015). 689 See: http://www.tfi.org/about (accessed on December 29, 2015). 690 See: https://www.tfi.org/advocacy/stewardship (accessed on December 29, 2015). 691 See: http://www.tfi.org/safety-and-security-tools (accessed on December 29, 2015). 692 See: http://www.tfi.org/compliance-assessment-tool (accessed on December 29, 2015). 693 See: https://www.asmark.org/Compass/ComplianceAssessmentTool/ (accessed on December 29, 2015). 694 Ibid. 695 Ibid.

West Fertilizer Company Final Report January 2016 217 U.S. CHEMICAL SAFETY AND HAZARD INVESTIGATION BOARD

information, and describing scope of operations, the user can download a specific compliance assessment document and then complete a worksheet.696 Periodic use of the tool is encouraged to help control risk and to support compliance efforts.697 8.8.1.2 Safety and Security Guidelines for the Storage and Transportation of FGAN at Fertilizer Retail Facilities TFI and the ARA created the Safety and Security Guidelines.698 TFI’s website notes that “the document was created to fill the void in emergency response guidelines specific to FGAN fertilizer at retail fertilizer facilities.”699 The guidelines outline best practices for safe and secure storage and transport of FGAN.700 They also summarize storage and handling regulations for FGAN facilities as well as recommendations for first responders.701 Moreover, they provide rules for transporting FGAN via truck, highway, rail, and barge.702 8.8.1.3 ResponsibleAg Created by TFI and the ARA in 2014, ResponsibleAg is a third-party auditing program for fertilizer retailers.703 Although any business that stores or handles fertilizer product is eligible to participate in the ResponsibleAg Certification Program, the first three years of the program focus on companies that store and handle AN and/or anhydrous ammonia fertilizer.704 Using federal requirements for the storage and handling of fertilizer products, ResponsibleAg has compiled a checklist of more than 320 questions for auditing each participating facility.705 The participating facility determines the audit scope; however, all participants must have a “base audit.”706 A participating facility may become ResponsibleAg certified only if it passes the initial audit or if it takes all necessary steps to correct the issues identified during the audit and documented in the facility’s corrective action plan.707 ResponsibleAg also allows its participating suppliers to access the list of participating facilities that have successfully completed the assessment and earned certification.708 This is important because it allows suppliers to determine whether prospective buyers have successfully completed the ResponsibleAg assessment, which thereby promoted federal regulatory compliance. This approach enables

696 Ibid. 697 Ibid. 698 See: http://www.tfi.org/ammonium_nitrate_guidelines (accessed on December 29, 2015). 699 Ibid. 700 Ibid. 701 Ibid. 702 Ibid. 703 Ibid. 704 See: http://www.responsibleag.org/About.cgi (accessed on December 29, 2015). 705 Ibid. 706 Ibid. 707 These corrective actions must be certified by ResponsibleAg, usually during a verification audit. 708 See: https://www.responsibleag.org/FAQ.cgi#Link02 (accessed on December 29, 2015).

West Fertilizer Company Final Report January 2016 218 U.S. CHEMICAL SAFETY AND HAZARD INVESTIGATION BOARD

ResponsibleAg members to engage in some elements of product stewardship (as discussed in Section 8.8.3). Notably, CF Industries and EDC, the only AN fertilizer manufacturers in the United States, are listed as ResponsibleAg participants.709 Appendix F includes additional information on the ResponsibleAg program process. 8.8.2 Agricultural Retailers Association (ARA) The ARA is also a major trade association for the fertilizer industry.710 It represents agricultural retailers and distributors across the United States on legislative and regulatory issues.711 ARA members represent the majority of agribusinesses in the United States.712 The ARA works with Congress to create legislation, and updates federal agencies and legislators on important issues affecting the industry.713 The ARA offers programs and services to keep its members informed of important industry issues.714 8.8.3 Product Stewardship As of this report’s publication, only two companies in the United States, CF Industries and EDC, manufacture FGAN.715 Fertilizer manufacturers can promote the safe storage and handling of FGAN by distributors and retailers by implementing product stewardship programs. According to the Center for Chemical Process Safety, product stewardship encourages safety and health in the design, manufacture, marketing, distribution, handling, use, and disposal of chemical products.716 Responsibility for safely managing the product is shared throughout the supply chain and the product life cycle. Because it is a self-regulated program, product stewardship can only be as effective as industry intends and allows. CSB determined that components of an effective product stewardship program should generally include the following elements for each product: • Identifying and communicating all product hazards among manufacturers, distributors, and retailers. • Providing supplemental technical information on safe handling practices for the product (furnished by manufacturers and/or distributors) to other distributors and/or retailers. • Establishing accountability for distributors and retailers to promote safe handling of a product throughout the chain of customers. • Performing monitoring and auditing, such as onsite visits to the locations where the product will be stored or used.

709 See: https://www.responsibleag.org/ParticipantList.cgi (accessed on December 29, 2015). 710 See: http://www.aradc.org/ARADC/About/About/ (accessed on December 29, 2015). 711 See: http://www.aradc.org/becomeamember/ (accessed on December 29, 2015). 712 Ibid. 713 Ibid. 714 See: http://www.aradc.org/about/about (accessed on December 29, 2015). 715 The WFC also reported receiving imported AN from foreign manufacturers between 2006 and 2013. 716 Center for Chemical Process Safety. Guidelines for Safe Handling of Powders and Bulk Solids. New York: Center for Chemical Process Safety/AIChE, 2005: 521.

West Fertilizer Company Final Report January 2016 219 U.S. CHEMICAL SAFETY AND HAZARD INVESTIGATION BOARD

• Developing mechanisms for outreach to communities near the facilities where the products are stored or used. Information sharing is an important component of product stewardship. When information about product hazards or details about the storage practices of a certain facility are known, people and companies dealing with the product or with the facility have the opportunity to effectively manage the risks associated with that product. The same logic applies to the management of FGAN. The WFC incident highlighted the need for greater awareness of the unpredictable nature of AN and the conditions under which it can detonate. Two industry programs, Responsible Care and ResponsibleAg, both advocate information sharing. Accordingly, the programs have serious product stewardship potential. As described in Section 8.8.1.3, the joint TFI-ARA ResponsibleAg program currently addresses some aspects of product stewardship. In particular, fertilizer sellers (i.e., manufacturers and/or distributors) may elect to access the list of ResponsibleAg-participating facilities to determine assessment completion and certification of prospective buyers (i.e., distributors and/or retailers). By doing so, the seller verifies that the buyer safely stores fertilizer (or at least has a record of safely storing fertilizer). Similarly, the American Chemistry Council’s (ACC) Responsible Care initiative includes information sharing in its product stewardship program. Participation in Responsible Care is a condition of membership for ACC members.717 The program specifies 11 management practices and focuses on leadership commitment, accountability and management, prioritization of products, product information, risk characterization, management of new information, product safety management, product design and improvement, value chain communication, cooperation and outreach, information sharing, and performance assessment and continual improvement.718 Serious participation in product stewardship programs such as ResponsibleAg and Responsible Care can promote the safe handling and storage of domestically manufactured FGAN. This is especially true for FGAN because there are only two companies, CF Industries and EDC, that manufacture FGAN in the United States. As such, domestically manufactured FGAN product can be linked to one of these two companies. CF Industries and EDC are already members of ResponsibleAg. Product stewardship programs such as ResponsibleAg can ensure that FGAN management practices, starting with FGAN manufacturers CF Industries and EDC, are subject to greater scrutiny. However, it is also important to make sure that distributors and retailers handle and store the product safely. Because responsibility for a chemical product does not always end after it is manufactured, it is important that manufacturing companies know how the product is handled and stored once it leaves the production site. In other words, a manufacturer cannot simply confirm that its direct buyer safely stores and handles the manufacturer’s product because that buyer may in turn sell to another buyer that does not store or handle the product safely. The same reasoning applies to communicating product hazards. Of course, requiring the manufacturer to communicate the hazards of its product to its buyer is surely a step in the

717 See: http://responsiblecare.americanchemistry.com/ (accessed on November 30, 2015). 718 See: http://responsiblecare.americanchemistry.com/Responsible-Care-Program-Elements/Product-Safety- Code/Responsible-Care-Product-Safety-Code-PDF.pdf (accessed on November 30, 2015).

West Fertilizer Company Final Report January 2016 220 U.S. CHEMICAL SAFETY AND HAZARD INVESTIGATION BOARD

right direction, but the buyer must also communicate the same hazards to its buyers, if any. Otherwise, catastrophic incidents can occur. Importantly, therefore, these distribution chains must not break; effective communication must endure from top to bottom. To ensure continuity of communication throughout the supply chain, industry should voluntarily take an active role. Because government agencies cannot reasonably be expected to routinely inspect every FGAN facility, industry’s product stewardship programs must play a significant role in making sure that this top-to-bottom approach is implemented. Product stewardship offers an important opportunity for industry to further manage risk, beyond providing SDSs to retailers. Although CF Industries and EDC use different business models, both have executed initiatives that ascribe to product stewardship elements post-incident. 8.8.4 Efforts to Address FGAN Hazards Post-Incident Since the WFC incident, both CF Industries and EDC have made additional efforts to make sure that their FGAN product is stored and handled safely as it moves out of their manufacturing facilities. CF Industries has implemented a certification process for its customers (purchasing organizations as well as facilities that receive FGAN deliveries) to confirm that customers communicate both the hazards and safe storage and handling practices of FGAN. As of December 31, 2014, CF Industries requires existing facilities to certify through a signed certification letter that they are in compliance with applicable guidelines and regulations before they can receive FGAN product. All new purchasing organizations and sites must also return the signed certification letter before receiving FGAN from CF Industries. Specifically, the letter requires senior responsible officials at both the purchasing organization and the delivery facility to certify that they are either in compliance with, or legally exempt from, 17 items. These items include, for example, attestations that: • The purchasing organization provided the FGAN SDS developed by CF Industries to all of its sites. • The purchasing organization and site provided copies of the CF Industries FGAN SDS to all employees. • The site complies with OSHA requirements for FGAN storage. • The site filed EPCRA and SARA Tier II Chemical Inventory Reports with appropriate emergency response organizations. • The site maintains and follows an emergency response plan and written procedures for the safe handling of AN. By signing the certification statement, officials at the purchasing organization certify that all relevant personnel at the site are aware of FGAN safety handling requirements and that adequate procedures are in place to comply with all 17 listed items. The certification packet also includes an up-to-date FGAN SDS developed by CF Industries and the TFI-ARA guidance for FGAN. CSB determined that this process could provide a reasonable degree of assurance that FGAN product hazards are being communicated as the product is delivered to new and existing customers and, most important, that those customers comply

West Fertilizer Company Final Report January 2016 221 U.S. CHEMICAL SAFETY AND HAZARD INVESTIGATION BOARD

with applicable regulations and practices in order to receive product. If CF Industries does not receive a completed and signed certification statement, it will not sell FGAN product. Although not in the form of a certification statement program, EDC also took steps to enhance the safety of its FGAN product post-incident. EDC updated its SDS for FGAN to include more information regarding firefighter precautions and added a reference to NFPA 400.719 Moreover, EDC developed a product information bulletin to accompany its SDS to emphasize FGAN hazards and safety measures.720 To better communicate FGAN hazards in response to the WFC incident, EDC conducted mass mailings to all of its customers. The mailings included the following: • EDC’s revised SDS (September 2013 and November 2014 versions). • TFI-ARA Safety and Security Guidelines for Ammonium Nitrate. • OSHA Guidance on Ammonium Nitrate Storage Requirements in 29 CFR 1910.109(i). In addition, EDC repaired and replaced wooden bins at its own owned-and-operated retail site locations to ensure compliance with OSHA requirements regarding the protection of bins against AN impregnation. In gathering information regarding these post-incident safety initiatives, CSB found that CF Industries and EDC operate under different business models, despite their status as the only two manufacturers of FGAN in the United States. CF Industries does not directly sell to retailers, but may deliver directly to retailers at the instruction of a direct customer. It delivers FGAN only to independently owned and operated distributors or their retail customers. CF Industries does not own any of the distribution facilities to which it ships product, and it does not sell directly to retailers, although it might deliver directly to retailers at the instruction of a direct customer. Unlike CF Industries, EDC delivers some FGAN product to its own owned-and-operated distribution sites. In this regard, the business models of CF Industries and EDC differ. EDC produces FGAN in El Dorado, Arkansas, which is shipped by rail or truck to either (1) its own distribution sites, which operate under the name EDC Ag Products Company, LLC (EDC Ag Products),721 or (2) its larger customers. Approximately 40 percent of the FGAN produced at the EDC Arkansas manufacturing facility is shipped to its 11 EDC Ag Products distributor locations (most in Texas), and approximately 60 percent is sold directly to customers. From the EDC Ag Products distributor locations, FGAN may be sold to other distributors or to retailers or farmers. All of the FGAN sold directly from the EDC manufacturing facility in Arkansas is delivered mainly to dealers, with a small quantity to brokers.

719 See: http://eldoradochemical.com/MSDS_Sheets/EDC/EDC_Products/EDCC_AN_Prill_SDS_Information_Bulletin_No v_2014.pdf (accessed December 29, 2015). 720 Ibid. 721 At the time of the incident, the distribution sites operated under the name El Dorado Chemical. El Dorado Chemical Company and EDC Ag Products Company, LLC are subsidiaries of LSB Industries, a manufacturing and marketing company.

West Fertilizer Company Final Report January 2016 222 U.S. CHEMICAL SAFETY AND HAZARD INVESTIGATION BOARD

At the time of the WFC incident and as long ago as 2004, EDC sold products to International Chemical Company (Inter-Chem), which acted as a trader or supplier of FGAN, among other fertilizer products. Through its Domestic Plant Foods Group, Inter-Chem is a distributor of phosphate, nitrogen, and potash products in the United States.722 Essentially, Inter-Chem served as a broker and consignee of finished fertilizer products to the WFC. Although Inter-Chem did not produce or manufacture the fertilizer product that was sold to the WFC, its role as a broker was significant. Importantly, Inter-Chem functioned as another link in the chain of commerce as the FGAN traveled from manufacturer to retailer through the broker. To better understand the chain of hazard communication involved in this investigation, CSB started at the top with the manufacturers and analyzed the pre-incident SDSs and hazard communication practices of both EDC and CF Industries. Before the WFC incident, EDC provided a copy of its SDS to its customers and to Inter-Chem. The EDC SDS in use at the time of the 2013 WFC incident was last revised in 2011. CSB reviewed the SDS and found that it lacked certain safety information, specifically related to firefighting measures. The 2011 EDC SDS included warnings about the hazards of AN, such as its capability to support combustion and become explosive in the presence of contaminants or when under confinement. Under the firefighting measures section, the SDS instructed firefighters to “flood with water” but did not address the proper way to handle massive and uncontrollable fires, the need to extinguish such fires from a distance, or the possible need for evacuation. In addition, the SDS lacked references to applicable AN safety standards, such as the OSHA Explosives and Blasting Agents standard and NFPA 400 (2010 Edition). On the other hand, the CF Industries pre-incident SDS included a comprehensive list of AN hazards and firefighting measures. Nonetheless, both CF Industries and EDC made changes to enhance the safe handling of their products after the WFC incident. As previously discussed, both U.S. FGAN manufacturers have improved communications with their customers about FGAN hazards and safe storage practices since the WFC incident. CF Industries implemented a program to certify compliance with applicable standards and guidelines as a condition of sale. In contrast, EDC conducted hazard communication in the form of mass mailings, replaced and repaired its own wooden bins at EDC Ag Products facilities, and continues to audit and inspect its retail sites (which it can readily do because EDC owns and operates these retail divisions) to make sure that about 40 percent of its manufactured FGAN is stored in compliance with applicable standards. These efforts represent a step in the right direction. However, because both EDC and CF Industries sell significant quantities of FGAN through brokers or through independent warehouses or distributors, whose direct customers may be unknown to EDC and CF Industries, it might not be possible in certain situations for the manufacturers to always ensure that their product is handled and stored in accordance with safety guidelines as the product moves downstream. At the very least, however, the certification statement program implemented by CF Industries attempts to ensure compliance with applicable regulations by causing its customers to attest to having knowledge of them.

722 See: http://www.ictulsa.com/domestic_fert.html (accessed on December 29, 2015).

West Fertilizer Company Final Report January 2016 223 U.S. CHEMICAL SAFETY AND HAZARD INVESTIGATION BOARD

As previously discussed, the CF Industries certification program strives to certify compliance by requiring purchasing organizations to affirm that their customers are in compliance with the CF Industries certification program elements. CSB found no evidence of such a program at EDC. Because EDC also sells product through wholesalers and distributors, a similar certification program, if implemented properly in conjunction with other components of product stewardship, will ensure that EDC product is handled safely throughout by its chain of customers. In concert with CF Industries’ efforts, this can effectively promote the safety of all domestically manufactured FGAN. 9.0 Land Use The West Fertilizer Company (WFC) incident led many observers to ask a seemingly simple question: Why would a community be located so close to a facility storing a potentially dangerous chemical? Although the question might be simple, the answer is not. In fact, the city of West, Texas, was so near the WFC facility primarily because of the following factors: • The city “came to” the WFC facility over the years. • There was a lack of zoning regulations. These factors are interrelated. The growth of the community near the WFC facility made it difficult for the city to later enact zoning regulations to require risk mitigating actions such as a buffer zone between the facility and the community. This is not to say that West is an anomaly. Many communities in Texas and nationwide are located too close to facilities resembling the WFC plant.723 This reality highlights the need to explore why communities live with these hazards so that authorities can better mitigate the offsite consequences from incidents such as the fire and explosion at the WFC plant in West. In this section, CSB seeks to explain the previously mentioned factors, providing insights into the proximity of the WFC facility to the West community. Following that discussion, other CSB investigations involving offsite consequences are highlighted to emphasize the scope of the problem. International land use perspectives also are provided to compare various approaches to the issue. In addition, efforts to address land use planning after the WFC incident are discussed. 9.1 Land Use Planning: An Introduction Land use planning is a complex and controversial topic. It provides a framework for limiting private land use when necessary for the public benefit. However, economic, social, safety, and environmental interests must be effectively balanced to achieve this benefit. Such competing interests generate highly emotional and contentious debates. Ultimately, however, the decision is political in nature. The community must decide on the best use of land for its development and growth. Urban sprawl,

723 As of December 6, 2013, Texas had 104 facilities storing 10,000 pounds or more of FGAN.

West Fertilizer Company Final Report January 2016 224 U.S. CHEMICAL SAFETY AND HAZARD INVESTIGATION BOARD

environmental concerns, and hazardous conditions are just some of the issues that land use planning addresses. The United States takes a decentralized approach to land use planning; that is, states are largely vested with the authority to regulate and enforce the private use of land. In turn, the states delegate this authority to local governments. This approach generally results in municipalities establishing land use regulations for various areas within their respective jurisdictions. The federal or state government has asserted authority in some areas of land use planning, but the majority of land use planning authority in the United States lies with local governments. The benefits of such an approach stem from the regulatory flexibility to address issues of land use. The judiciary resolves any potential conflicts. Land use planning cannot be said to solve all developmental issues that a community encounters. Land use regulation does give the community a control mechanism to reduce the consequences of an incident but does not eliminate the need for preventive controls. Rather, the mitigative control of land use planning must be combined with preventive controls employed by a variety of different stakeholders. Land use planning is a critical control to foster community development, but it must be integrated with other complementary approaches. At its heart, land use planning offers the means for dealing with development and growth. However, many interests must be taken into account when attempting to effectively ensure a safe and satisfying community. Land use planning considerations can offer insights into the issues evident in the WFC incident. The location of the city of West near the WFC facility produced numerous benefits for the community; however, as the WFC fire and explosion revealed, such siting also had deadly consequences. 9.2 The City That “Came to” the WFC Over the Years The WFC facilities were constructed and began operations in 1962.724 At the time, the facilities were largely surrounded by open fields, raising little concern about any potential offsite consequences. Furthermore, no zoning regulations existed when the WFC began business.725 Over the years, however, the city of West began to slowly develop around the WFC property. As the WFC was grandfathered into West ordinances and the city was subsequently zoned residential, little attention was paid to the city’s slow but steady encroachment toward the WFC facility.

724 Crain, Zac. “Love and Loss in a Small Texas Town.” D Magazine (July 2013). See: http://www.dmagazine.com/Home/D_Magazine/2013/July/West_Texas_Love_and_Loss_in_a_Small_Town.aspx?p age=1 (accessed on November 25, 2014). 725 According to the West Code of Ordinances, the earliest zoning regulation was adopted on March 21, 1967. City of West. Chapter 14, Section 14.01.001. Code of Ordinances. See: http://z2codes.franklinlegal.net/franklin/Z2Browser2.html?showset=westset (accessed on November 25, 2014).

West Fertilizer Company Final Report January 2016 225 U.S. CHEMICAL SAFETY AND HAZARD INVESTIGATION BOARD

West was officially incorporated as a city in 1892, and with the help of a railroad track and fertile land for farming, it thrived.726 Before construction of the WFC plant, the area north of the city was largely open fields used for agriculture and ranching. At the time that the WFC began operations, the area maintained the same character except for a residence located approximately 250 feet north of the WFC property line.727 The location was ideal for such a business—just outside of the city, next to a railroad track, and within a convenient distance for local farmers. West lacked zoning regulations when the WFC completed its construction, and there appeared to be little need for such regulations as the WFC facilities were far removed from the city. Furthermore, the portion of the WFC property where fertilizers and pesticides were stored was outside of the West city limits and thus outside of its jurisdiction.728 Within this framework, the city of West began to expand and grow around the WFC facility. As shown in Figure 74, the city began developing further north over the years. This growth continued until the community was adjacent to the WFC property. Parks, subdivisions, nursing homes, schools, and an apartment complex sat within a 600-foot radius of the facilities. Furthermore, as the city continued to build its infrastructure near the WFC facility, the area became an even more attractive target for development. The community hardly noticed the WFC facility. It was only aware of the risk of accidental releases of anhydrous ammonia but viewed such events with little concern. Figure 75 shows the WFC facility before and after the incident.

726 City of West. “City of West, Our History.” See: http://www.cityofwest.com/our-history (accessed on November 25, 2014). 727 Determined by using the December 14, 1964, aerial photograph of West, Texas, and employing Google Earth. 728 McLennan CAD. “Property Search Results: Property ID 2013357, Adair Grain, Inc. for Year 2013.” See: https://propaccess.trueautomation.com/Map/View/Map/20/201357/2013 (accessed on December 28, 2015).

West Fertilizer Company Final Report January 2016 226 U.S. CHEMICAL SAFETY AND HAZARD INVESTIGATION BOARD

Figure 74. Progressive Development of West (Source: GeoSearch)

West Fertilizer Company Final Report January 2016 227 U.S. CHEMICAL SAFETY AND HAZARD INVESTIGATION BOARD

Figure 75. Aerial Photographs of the WFC Facility Before (left) and After (right) the Incident (Source: NBC News) This lack of proper foresight played a significant role in explaining why West came to be located so close to the WFC plant. Unfortunately, as the WFC was grandfathered into the city’s Code of Ordinances,729 the city was not required to address the risks involved in this encroachment. Not that West is a peculiar case; in many instances across the country, similar problems exist.730 9.3 Lack of Zoning Regulations Both the federal government and Texas have failed to issue regulations relating to siting facilities that store and distribute FGAN near communities such as West. If a regulation had addressed issues such as buffer zones, barricades, or other techniques to mitigate consequences, the severity of the casualties and damage experienced in West could have been significantly reduced. Moreover, although regulation cannot solve all problems, it serves as a mechanism to compel all industries to adopt and implement safer operations. Ultimately, the failure to mitigate the consequences of incidents such as the WFC fire and explosion in West exists at all levels of government. U.S. law largely assigns the authority to regulate private land use to the individual states.731 In turn, the states generally assign this authority to individual municipalities. It is important to note, however, that

729 City of West. Chapter 14. Code of Ordinances. See: http://z2codes.franklinlegal.net/franklin/Z2Browser2.html?showset=westset (accessed on November 25, 2014). 730 For example, CSB reports on NDK, DPC, Concept Sciences, and the Caribbean Petroleum Refining tank explosion and fire. 731 Because the Federal government is only vested with the powers delegated to it through the Constitution—such as the power to regulate interstate commerce, coin money, and so forth—it is limited in its capability to regulate issues

West Fertilizer Company Final Report January 2016 228 U.S. CHEMICAL SAFETY AND HAZARD INVESTIGATION BOARD

the state’s authority can be preempted by the federal government in certain instances, and two of the main instances are matters concerning interstate commerce732 and international treaties.733 This dual sovereignty can allow for greater flexibility in resolving land use issues that affect the public. Over time, the federal government has assumed an increasing role in the regulation of land use issues, including those relating to storing chemicals such as FGAN. ATF, the U.S. Department of Housing and Urban Development (HUD), the Pipeline and Hazardous Materials Safety Administration (PHMSA), OSHA, and EPA have all promulgated regulations or recommendations relating to the siting of explosives, reactives, oxidizers such as FGAN, and flammable cryogenics such as liquefied natural gas (LNG) near populated areas. Table 14 briefly lists the relevant regulations issued by these agencies. Table 14. Relevant Siting Regulations Agency Regulation CFR ATF Commerce in Explosives 27 CFR Part 555 DOT Liquefied Natural Gas Facilities: Federal Safety Standards 49 CFR Part 193 HUD Environmental Criteria and Standards 24 CFR Part 51 OSHA Occupational Safety and Health Standards 29 CFR Part 1910 EPA Chemical Accident Prevention Provisions 40 CFR Part 68 Standards for Owners and Operators of Hazardous Waste Treatment, Storage, and Disposal Facilities 40 CFR Part 264

ATF holds the authority to require setting off stored explosive materials and low-explosive materials from inhabited buildings, public highways, public railways, and magazines.734 Although explosive grades of FGAN are currently listed as explosive materials, the FGAN stored at the WFC facility is not categorized as an explosive material or a low-explosive735 material.736 Therefore, WFC storage of FGAN was not

related to land use. See: 10th Amendment, U.S. Constitution. However, state zoning regulations are subject to Federal preemption in areas where the use of land affects interstate commerce, international treaties, and Federal government spending powers. 732 U.S. Constitution, Article I, Section 8. 733 U.S. Constitution, Article VI. 734 27 CFR 555.218–219: “Explosive materials” are defined as explosives, blasting agents, water gels, and detonators. 27 CFR 555.11: “Explosives” are defined as any chemical compound, mixture, or device, the primary or common purpose of which is to function by explosion. 735 Low explosives are defined as “explosive materials which can be caused to deflagrate when confined. See: http://www.gpo.gov/fdsys/pkg/FR-2012-09-20/pdf/2012-23241.pdf (accessed on December 29, 2015). 736 See: http://www.gpo.gov/fdsys/pkg/FR-2012-09-20/pdf/2012-23241.pdf (accessed on December 28, 2015). See also: 27 CFR 555.220 Note (1), which states: “FGAN, by itself, is not considered to be a [explosive or blasting

West Fertilizer Company Final Report January 2016 229 U.S. CHEMICAL SAFETY AND HAZARD INVESTIGATION BOARD

subject to ATF set-off distances.737 However, ATF has the authority to require a minimum separation distance between the FGAN stored at the WFC facility and certain blasting agents.738 DOT received Congressional authorization to “prescribe minimum safety standards for deciding on the location of a new liquefied natural gas [LNG] pipeline facility,” which it oversees through PHMSA.739 In turn, PHMSA has promulgated a series of recommendations concerning siting requirements for LNG facilities.740 The regulations are based on NFPA 59A concerning the production, storage, and handling of LNG.741 The siting requirements address issues such as thermal radiation protection, flammable vapor- gas dispersion protection, and wind forces. PHMSA applies the regulations to LNG facilities “designed, constructed, replaced, relocated or significantly altered after March 31, 2000,” thereby grandfathering LNG facilities that existed before the March 31 date.742 However, PHMSA has no regulations concerning the siting of AN facilities. HUD requires projects receiving its assistance to be separated by an acceptable distance from specific stationary hazardous operations that store, handle, or process hazardous substances.743 Hazardous substances are defined as “petroleum products (petrochemicals)” and other hazardous chemicals identified by HUD that can produce blast overpressure or thermal radiation levels in excess of HUD standards.744 FGAN is not identified as a hazardous substance for the purposes of this standard.745 In addition, the city of West would not qualify for HUD assistance as it does not meet HUD eligibility requirements.746

agent].” See also: 72 Federal Register 18792, 18796, which states: “[A]lthough FGAN is a component of certain explosives such as ANFO, by itself, it is not an explosive. Therefore, it is not regulated by these ATF regulations.” 737 The purpose behind regulating the siting of ANFO was “to protect interstate and foreign commerce against interference and interruption by reducing the hazard to persons and property arising from misuse and unsafe or insecure storage of explosive materials.” Section 1101, Public Law 91-452, reprinted in: U.S. Code Congressional and Administrative News 1109 (1970). 738 27 CFR 555.220. 739 49 U.S.C. § 60103 (2014). 740 49 CFR 193 Subpart B (2014). 741 65 CFR 10950 (2000) and 69 Federal Register 11330 (2004). 742 49 CFR § 193.2051(2014). 743 24 CFR Subpart C; specifically 24 CFR 51.204 and 24 CFR 51.205. See: http://portal.hud.gov/hudportal/HUD?src=/program_offices/comm_planning/environment/training/guidebooks/hazfa cilities (accessed on December 28, 2015). The intent in creating these regulations was “to encourage improvements in housing standards and conditions.” “The National Housing Act.” See: http://portal.hud.gov/hudportal/documents/huddoc?id=HUD-Guidebook.pdf (accessed on December 28, 2015): 3–4. 744 24 CFR 51.201, 203. 745 24 CFR Part 51, Appendix I to Subpart C. Anhydrous ammonia is also not listed as a hazardous substance; however, under special circumstances, the Secretary may require the application of a substance not listed in Appendix I to Subpart C. See: 24 CFR 51.207 (2014). 746 See: http://portal.hud.gov/hudportal/HUD?src=/program_offices/comm_planning/communitydevelopment/programs/entit lement (accessed on December 28, 2015). Eligible HUD grantees include (1) principal cities of metropolitan statistical areas, (2) other metropolitan cities with populations of at least 50,000, and (3) qualified urban counties with populations of at least 200,000 (excluding the population of entitled cities).

West Fertilizer Company Final Report January 2016 230 U.S. CHEMICAL SAFETY AND HAZARD INVESTIGATION BOARD

OSHA requires facilities handling highly hazardous chemicals to address facility siting issues; however, the requirement only deals with onsite consequences, not the issue of siting communities near highly hazardous chemical facilities.747 This requirement is part of the Process Safety Management (PSM) regulation, which seeks to prevent or minimize the consequences of catastrophic releases of “highly hazardous chemicals.”748 However, the PSM regulation does not include FGAN as a highly hazardous chemical.749 In addition, OSHA has the authority to require separation distances between FGAN and blasting agents,750 in the same manner as ATF.751 The federal agency concerned with offsite consequences, EPA, addresses the siting of hazardous facilities near population centers by issuing various regulations and guidance.752 For example, EPA regulates facility siting through its Risk Management Program rule, which calls on operators to address “stationary source siting” in its Program Level 3 process hazard analysis.753 However, EPA offers little to no guidance to operators on how to satisfy the “stationary source siting” requirement.754 The Risk Management Program rule also requires operators to conduct an offsite consequence analysis to provide government officials and the public with information about the potential consequences of an accidental release.755 However, as FGAN is not classified as a hazardous regulated substance under the Risk Management Program rule, the WFC was not required to conduct such an analysis for its stored FGAN. In addition, EPA is currently considering the inclusion of “facility and equipment siting factors” in the Risk Management Program rule.756 Furthermore, EPA addresses facility siting through regulation and guidance concerning the siting of hazardous waste management facilities near communities and sensitive environments.757 EPA also has issued guidelines relating to siting schools near potential environmental hazards, which could have proven

747 29 CFR 1910.119(e)(3)(vii). 748 29 CFR 1910.119. 749 29 CFR 1910.119, Appendix A. 750 29 CFR 1910.109, Table H-22. 751 27 CFR 555.220. 752 See: http://www.epa.gov/statelocalclimate/local/topics/land.html (accessed on December 28, 2015). 753 40 CFR 68.67(c)(5) (2014). 754 The only real guidance on these terms is found in API RP 752, “Permanent Building Siting”; API RP 753, “Portable Building Siting”; and API RP 756, Tent Siting (to be issued in 2014). However, these guidance documents have been developed without any regulatory guidance. Furthermore, the identified standards have nothing to do with the relationship of the facility to its surrounding community. See: http://www.absconsulting.com/webinars/facility-siting.cfm (accessed on December 28, 2015). 755 40 CFR 68.150–68.195 (2014). The analysis consists of two elements, a worst case release scenario and alternative release scenarios. 756 See: https://www.osha.gov/chemicalexecutiveorder/final_chemical_eo_status_report.pdf (accessed on December 28, 2015): 36. 757 See: http://www.epa.gov/osw/hazard/tsd/permit/site/sites.htm (accessed on December 28, 2015); 42 U.S.C. § 6924 (2014); 40 CFR 264.18 (2014); 40 CFR 265.18 (2014); 40 CFR 270.14(b)(11) (2014); and 40 CFR 270.32(b)(2) (2014). See also: http://homer.ornl.gov/sesa/environment/guidance/rcra/locate.pdf (accessed on December 28, 2015).

West Fertilizer Company Final Report January 2016 231 U.S. CHEMICAL SAFETY AND HAZARD INVESTIGATION BOARD

helpful to West and similarly situated communities.758 Moreover, EPA has recommended using information related to the Emergency Planning and Community Right-to-Know Act to inform a community’s decisions concerning zoning and land use planning.759 Thus, federal regulations and guidance on land use do exist and do give communities valuable information regarding various chemical hazards. However, because FGAN is not defined as an explosive or hazardous material, it is excluded from federal zoning regulations. Unfortunately, this situation allows fertilizer facilities to store FGAN onsite without any federal oversight to confirm that the associated risks of locating communities nearby are mitigated to sufficient levels. At the state level, Texas does little to oversee land use issues.760 Instead, Texas grants the most land use oversight authority to its municipalities.761 Texas has no regulation relating to siting hazardous facilities near communities.762 Moreover, no state administrative agency oversees hazardous facility siting.763 At the county level, regulatory authority is limited to zoning specific areas (such as Padre Island, Lake Tawakoni, and Falcon Lake), which results in a failure to approach county zoning from a general perspective.764 This observation does not indicate that a one-size-fits-all approach to zoning is always desired.765 In fact, in many instances, land use oversight needs to be tailored to specific political, social, economic, and environmental needs of the community.766

758 See: http://www.epa.gov/schools/siting/basic.html (accessed on December 28, 2015). 759 See: http://www.epa.gov/osweroe1/docs/chem/notice.pdf (accessed on January 6, 2016): 7; see also: http://www.nicsinfo.org/docs/LEPCStudyFinalReport.pdf (accessed on December 28, 2015): 7. 760 See: http://stateimpact.npr.org/texas/2013/04/22/after-west-fertilizer-explosion-concerns-over-safety-regulation- and-zoning/ (accessed on December 28, 2015). 761 Texas Statute, Local Government Code, Title 7, “Regulation of Land Use, Structures, Businesses, and Related Activities.” See: http://www.statutes.legis.state.tx.us/ (accessed on January 6, 2016). For instance, municipalities must adopt a zoning ordinance in accordance with a comprehensive plan; county zoning ordinances deal with specific areas such as military zones, Padre Island, and Amistad Recreation Area. See: http://www.statutes.legis.state.tx.us/Docs/LG/htm/LG.231.htm (accessed on December 28, 2015). 762 The Texas Administrative Code fails to address such siting issues. The Texas Department of Public Safety, Division of Emergency Management, holds responsibility for preparing the state emergency management plan, which may include “recommendations for zoning, building restrictions, and other land-use controls . . . to eliminate or reduce disasters or their impact . . . .” Texas Government Code, Title 4, Subtitle B, Chapter 418, Section 418.042. However, the state has not issued any such recommendations. See: https://www.txdps.state.tx.us/dem/downloadableforms.htm#stateplan (accessed on December 28, 2015). 763 See: http://texreg.sos.state.tx.us/public/readtac$ext.ViewTAC (accessed on December 29, 2015). 764 See: http://www.statutes.legis.state.tx.us/Docs/LG/htm/LG.231.htm (accessed on December 28, 2015). Texas House of Representatives, Committee on County Affairs. “Interim Report to the 80th Texas Legislature,” December 2006: 7. See also: http://www.lrl.state.tx.us/scanned/interim/79/C832.pdf (accessed on December 8, 2014). 765 APA discussion on Growing Smart project with Stuart Meck. See: http://www.planning.org/growingsmart/background.htm (accessed on January 6, 2016). 766 See: http://www.planning.org/growingsmart/background.htm (accessed on December 28, 2015).

West Fertilizer Company Final Report January 2016 232 U.S. CHEMICAL SAFETY AND HAZARD INVESTIGATION BOARD

At the local level, Texas municipalities are granted the authority to regulate private land, including the location of hazardous facilities.767 Among other requirements, the zoning regulations must be designed to ensure public safety from fires and other dangers.768 However, the municipality is not given the authority to remove the hazardous condition on the property that exists at the time the governing body implements zoning authority and that is used in a public service business.769 The municipality is allowed to impose zoning regulations relevant to the storage and use of hazardous substances.770 In the case of West, Texas, this arrangement led to the city being vested with the most authority in regulating public use. West exercised this authority through its Code of Ordinances.771 West had zoned all property within the city limits for residential purposes only. However, all real property that had been used for commercial purposes before 1987 could remain commercial in nature. Any future development with commercial intent required a rezoning procedure.772 This provision is consistent with West’s comprehensive plan to zone all property within the city limits as residential property. In essence, regulatory authority has been delegated to municipalities to oversee the siting of facilities storing and distributing FGAN near cities such as West. Neither the federal government nor the state of Texas takes any part in oversight. In many instances, however, municipalities are unable to adequately address this complex issue through regulatory mechanisms. For instance, facilities such as the WFC plant existed before promulgation of the city’s Code of Ordinances, posing an issue of grandfathered facilities. Many different economic, safety, environmental, and agricultural interests must also be balanced. Furthermore, municipalities already face a shortage of resources for other essential governmental functions. However, safety issues can be addressed through reasoned regulation, using a number of methods. For example, a regulation requiring separation distances between public receptors and facilities handling FGAN could help mitigate offsite consequences in cities such as West. At root, however, locating these facilities near communities represents a national concern; therefore, all levels of government should give consideration to developing land use regulations to counter this problem.

767 Texas Statute, Local Government Code, Title 7, Subtitle A, Chapter 211, Section 211.003. See: http://www.statutes.legis.state.tx.us/Docs/LG/pdf/LG.211.pdf (accessed on December 28, 2015). 768 Texas Statute, Local Government Code, Title 7, Subtitle A, Chapter 211, Section 211.004. See: http://www.statutes.legis.state.tx.us/Docs/LG/pdf/LG.211.pdf (accessed on December 28, 2015). 769 Texas Statute, Local Government Code, Title 7, Subtitle A, Chapter 211, Section 211.013. See: http://www.statutes.legis.state.tx.us/Docs/LG/pdf/LG.211.pdf (accessed on December 28, 2015). 770 Texas Statute, Local Government Code, Title 7, Subtitle A, Chapter 211, Section 211.017. See: http://www.statutes.legis.state.tx.us/Docs/LG/pdf/LG.211.pdf (accessed on December 28, 2015). The term “hazardous substances” is not defined in the chapter. 771 See: http://z2codes.franklinlegal.net/franklin/Z2Browser2.html?showset=westset (accessed on December 28, 2015). 772 Section 14.01.002. See: http://z2codes.franklinlegal.net/franklin/Z2Browser2.html?showset=westset (accessed on December 28, 2015).

West Fertilizer Company Final Report January 2016 233 U.S. CHEMICAL SAFETY AND HAZARD INVESTIGATION BOARD

  1. 3.1 Importance of Land Use Planning in Siting Communities Near Facilities

Storing FGAN and Other Hazardous Chemicals The issue of siting hazardous facilities storing FGAN near cities such as West is not an anomaly; it is a nationwide problem. In addition, although not directly associated with FGAN storage facilities, land use issues have been at the forefront of multiple CSB investigations. Furthermore, CSB has identified— multiple times—the risks of locating a hazardous chemical facility near public receptors. Table 15 lists CSB investigations that involved land use issues. Table 15. Investigations Involving Land Use Issues Investigation Public Receptors Chemical Involved Offsite Consequences NDK Crystal, Inc. Interstate commerce, businesses Synthetic quartz crystal (silica and NaOH) 1 fatality DPC (Festus, MO) Highways, railroads, residences, businesses, farms Chlorine 63 residents who sought medical treatment Concept Sciences Businesses, residences Hydroxylamine 5 fatalities, 14 injuries, significant damage to buildings and shattered windows at residences CAI/Arnel Businesses, residences Heptane, isopropyl alcohol, n-propyl alcohol 10 injuries, 24 houses and 6 businesses significantly destroyed DPC (Glendale, AZ) Residences Chlorine 14 injuries Freedom Industries Residences, businesses, drinking water supply MCHM, PPH 369 residents who sought medical treatment for exposure Millard Refrigerated Services Businesses, environment Anhydrous ammonia 150 people who sought medical treatment for ammonia exposure T-2 Laboratories Inc. Businesses, residences, railroads Methylcyclopentadienyl manganese tri-carbonyl 28 injuries, significant property damage to nearby businesses Silver Eagle Refinery Residences Hydrocarbons Damage to residences Kaltech Residences, businesses, public streets Chemical waste At least 36 injured people, damage to residences and businesses Chevron Refinery Residences, businesses, public streets Hydrocarbons Approximately 15,000 people who sought medical treatment

West Fertilizer Company Final Report January 2016 234 U.S. CHEMICAL SAFETY AND HAZARD INVESTIGATION BOARD

Investigation Public Receptors Chemical Involved Offsite Consequences Caribbean Petroleum Residences, businesses, public streets Hydrocarbons Shutdown of major highways, evacuation of local residents Bayer CropScience Residences, college, businesses, interstate commerce, waterways Methomyl, methyl isobutyl ketone Property damage, community shelter-in- place activated

In light of this information, the WFC incident in West serves as yet another unnecessary and deadly reminder that little has been done to address the risks of locating communities near facilities handling hazardous chemicals such as FGAN. Furthermore, if the incident had occurred during school hours, many more adults and children could have been injured. This incident represents a microcosm of the potential harms that many communities across the nations could endure.773 9.3.2 International Perspectives Other countries have confronted problems similar to those in West, Texas, and have taken a variety of approaches to address them. The European and Australian strategies merit consideration given their sophistication relative to the current U.S. approach. The discussion in this section explores the approaches taken by the European Union (EU), the United Kingdom (U.K.), and Australia. 9.3.2.1 European Union Through its Seveso III Directive, the EU requires member countries to take land use planning policies “into account” as part of major accident prevention.774 The policy behind the requirement is designed to mitigate the consequences of major chemical accidents experienced by public receptors. The EU developed this requirement in the aftermath of major industrial incidents, including the FGAN explosion in Toulouse.775 In fact, the Seveso III Directive lists AN as a “dangerous substance,” classifying the chemical into four different categories, depending on whether it is FGAN, technical grade ammonium

773 See: http://news.yahoo.com/devastated-texas-town-ponders-schools-140711695.html (accessed on December 29, 2015). Jaeah Lee. “Map: Is There a Risky Chemical Plant Near You?” Mother Jones (April 17, 2014). See: http://www.motherjones.com/environment/2014/04/west-texas-hazardous-chemical-map (accessed on July 8, 2014). 774 Seveso III Directive, Article 13, “Land-use planning.” See: http://eur-lex.europa.eu/legal- content/EN/TXT/?uri=CELEX:32012L0018 (accessed on November, 2, 2015). 775 G. Vierendeels, et al. “Modeling the major accident prevention legislation change process within Europe.” Safety Science. 516 (2010).

West Fertilizer Company Final Report January 2016 235 U.S. CHEMICAL SAFETY AND HAZARD INVESTIGATION BOARD

nitrate (TGAN), off-specification ammonium nitrate (AN), or AN capable of self-sustaining decomposition.776 Under the Seveso III requirements, member countries are to ensure that their policies address “appropriate distances” between covered facilities and residential areas. Furthermore, the countries must “set up appropriate consultation procedures” with competent authorities to “facilitate the implementation” of the land use planning policies. The Seveso III Directive applies to new facilities, facilities undergoing modifications, and new developments. Existing facilities must determine whether additional technical measures are required to avoid an increase in risk to the nearby community.777 The Seveso III Directive does not prescribe best practice guidance for its technical requirements (such as separation distances), consistent with its respect for each country’s political, cultural, technical, and economic differences. However, various entities such as the Institute for Systems and Informatics and Safety provide best practice guidance, which refers to the use of technical approaches and procedural issues.778 Although such guidance offers helpful insights to member countries, the appropriate response for a specific site is still recognized as a matter of interpretation for each country. Given the immense differences among the approaches to land use planning of the member countries, it is difficult to compare EU country land use policies. However, the establishment of groups such as the European Commission and the Committee of the Competent Authorities under the Seveso III Directive emphasizes the important role that land use planning issues play in the European community.779 Although issues still remain relating to each country’s practices and methodologies, the emphasis on siting of facilities storing hazardous materials near public receptors highlights the importance that the European community places on land use planning in major accident prevention. 9.3.2.2 United Kingdom The U.K. vests a hazardous substances authority with the power to administer and enforce land use planning as it relates to storing or using hazardous substances. The hazardous substances authority is generally an entity charged with dealing with land use planning and zoning issues, known as the local

776 Seveso III Directive, Notes Section, “AN compounds with more that 28% by weight and AN based fertilizers.” 2012/18/EU. See: http://eur-lex.europa.eu/legal-content/EN/TXT/?uri=CELEX:32012L0018 (accessed on November 2, 2015). 777 Seveso III Directive, Article 13, “Land-use planning.” 2012/18/EU. See: http://eur-lex.europa.eu/legal- content/EN/TXT/?uri=CELEX:32012L0018 (accessed on November 2, 2015). 778 Christou, M.D., and S. Porter. “Guidance on Land Use Planning as Required by Council Directive 96/82/EC (Seveso II).” Institute for Systems Informatics and Safety, 1999. See: http://ipsc.jrc.ec.europa.eu/fileadmin/repository/sta/mahb/docs/LandUsePlanning/EUR18695EN_LandUsePlanning Guidance.pdf (accessed on December 28, 2015). 779 Major Accident Hazards Bureau. “Land Use Planning.” See: http://ipsc.jrc.ec.europa.eu/index.php/Land-use- planning/694/0/ (accessed on December 28, 2015).

West Fertilizer Company Final Report January 2016 236 U.S. CHEMICAL SAFETY AND HAZARD INVESTIGATION BOARD

planning authority.780 Consequently, the U.K. takes an approach similar to that of the United States in decentralizing land use planning to allow a local authority to promulgate and enforce land use requirements.781 For the WFC incident in West, Texas, the West City Council would be the analogue to the U.K. hazardous substances authority. The U.K., however, requires land use policies to account for major accidents caused by hazardous substances.782 This responsibility is executed through a collaborative effort among the hazardous substances authority, U.K. Health and Safety Executive (HSE),783 U.K. Environment Agency,784 and other interested stakeholders. Essentially, organizers of a proposed development must seek a hazardous substances consent from the hazardous substances authority to establish a facility that will store or use hazardous substances785 within its jurisdiction.786 When the hazardous substances authority receives an application for consent, it must consult with the HSE and the U.K. Environment Agency for advice on whether consent to the proposed development is warranted. Other interested stakeholders are also consulted or given the opportunity to publicly comment on the proposed development.787 Using all of the relevant information provided, the hazardous substances authority weighs all competing interests and decides whether to grant a hazardous substances consent to the proposed development.788 The U.K. attempts to balance each local community’s interest in deciding the risks that it will tolerate, drawing on the expertise and resources of national governmental bodies. Such an approach makes it more likely that all relevant issues and concerns about locating a development that stores or uses hazardous substances near the public will be presented to the hazardous substances authority before a

780 See: https://www.gov.uk/government/uploads/system/uploads/attachment_data/file/16628/hazardoussubstancesguide.pdf (accessed on December 28, 2015). 781 The U.K. has experienced similar catastrophic incidents that had effects on the population, including the Flixborough (Nypro UK) Explosion in 1974 and the Buncefield incident in 2005. See: http://www.hse.gov.uk/comah/sragtech/caseflixboroug74.htm and http://www.buncefieldinvestigation.gov.uk/, respectively (accessed on December 28, 2015). 782 Seveso Directive II, Article 12, “Land Use Planning.” See: http://eur- lex.europa.eu/LexUriServ/LexUriServ.do?uri=CONSLEG:1996L0082:20031231:EN:PDF (accessed on December 28, 2015). 783 The U.K. HSE is a governmental body responsible for enforcing health and safety at workplaces. See: http://www.hse.gov.uk/contact/authority.htm (accessed on December 28, 2015). 784 The U.K. Environment Agency is a governmental body responsible for protecting and improving the environment and for promoting sustainable development. See: http://www.environment-agency.gov.uk/aboutus/default.aspx (accessed on December 28, 2015). 785 FGAN is included within the definition of a “hazardous substance.” See: http://www.legislation.gov.uk/uksi/1999/981/schedule/1/made (accessed on December 28, 2015). 786 See: http://www.hse.gov.uk/landuseplanning/what.htm (accessed on December 28, 2015). 787 Other stakeholders include the local parish council, fire and civil defense authorities, and the governmental agency English Nature. 788 See: http://www.environment-agency.gov.uk/aboutus/default.aspx (accessed on December 28, 2015).

West Fertilizer Company Final Report January 2016 237 U.S. CHEMICAL SAFETY AND HAZARD INVESTIGATION BOARD

decision is rendered. The U.K. thus believes that major offsite risks can be effectively managed before permitting a hazardous substance to be stored near a population in its vicinity.789 9.3.2.3 Western Australia Australia’s land use planning methods regarding hazardous substances vary across jurisdictions.790 Although each Australian state and territory applies varying regulations regarding land use planning of FGAN storage facilities, the Government of Western Australia employs an insightful and sophisticated approach to the issue. In essence, Western Australia uses a risk-based method that subjects FGAN storage facility siting to government approval.791 Western Australia legislatively addresses land use issues concerning FGAN through its Dangerous Goods Safety Act 2004 (the Dangerous Goods Act). This act places a duty on all people involved with dangerous goods to minimize risk associated with those goods.792 To minimize risk, the Dangerous Goods Act requires that “all reasonably practicable measures” be used. In determining whether a measure is “reasonably practicable,” consideration is given to issues such as the severity of the harm, severity of the risk to people, and suitability of the means in question.793 FGAN is treated as a dangerous good under the Dangerous Goods Safety (Storage and Handling Non-Explosives) Regulations 2007 and the Dangerous Goods Safety (Major Hazard Facilities) Regulations 2007, which both support the Dangerous Goods Act.794

789 See: https://www.gov.uk/government/uploads/system/uploads/attachment_data/file/16628/hazardoussubstancesguide.pdf (accessed on December 28, 2015). 790 See: http://www.chemicalspolicy.org/downloads/chemicals-plastics-regulation.pdf (accessed on December 29, 2015). 791 Dangerous Goods Safety Act 2004. See: http://www.slp.wa.gov.au/legislation/statutes.nsf/main_mrtitle_242_homepage.html (accessed on December 28, 2015). Dangerous Goods Safety (Storage and Handling Non-Explosives) Regulations 2007. See: http://www.slp.wa.gov.au/legislation/statutes.nsf/main_mrtitle_12972_homepage.html (accessed on December 28, 2015). Dangerous Goods Safety (Major Hazard Facilities) Regulations 2007. See: http://www.slp.wa.gov.au/legislation/statutes.nsf/main_mrtitle_12983_homepage.html (accessed on December 28, 2015). Department of Consumer and Employment Protection Government of Western Australia. Safe Storage of Solid FGAN: Code of Practice: iii. See: https://miningandblasting.files.wordpress.com/2009/09/safe-storage-of- solid-ammonium-nitrate-code-of-practice.pdf (accessed on December 28, 2015). 792 Dangerous Goods Safety Act 2004, Part 2. See: http://www.slp.wa.gov.au/legislation/statutes.nsf/main_mrtitle_242_homepage.html (accessed on December 28, 2015). 793 Ibid. 794 Dangerous Goods Safety (Storage and Handling Non-Explosives) Regulations 2007. See: http://www.slp.wa.gov.au/legislation/statutes.nsf/main_mrtitle_12972_homepage.html (accessed on December 28, 2015). Dangerous Goods Safety (Major Hazard Facilities) Regulations 2007. See: http://www.slp.wa.gov.au/legislation/statutes.nsf/main_mrtitle_12983_homepage.html (accessed on December 28, 2015). Department of Consumer and Employment Protection Government of Western Australia. Safe Storage of Solid FGAN: Code of Practice: iii. See: https://miningandblasting.files.wordpress.com/2009/09/safe-storage-of- solid-ammonium-nitrate-code-of-practice.pdf (accessed on December 28, 2015).

West Fertilizer Company Final Report January 2016 238 U.S. CHEMICAL SAFETY AND HAZARD INVESTIGATION BOARD

Land use planning as related to siting facilities storing FGAN near public receptors is implemented by applying separation distances. These distances are subject to acceptance by Resource Safety, a department of the Government of Western Australia.795 If it is determined that an FGAN facility is not satisfying the separation distance requirement, Resource Safety may limit the quantity of FGAN within the facility or require that other safety conditions be met.796 The New South Wales Department developed the required separation distances with the intent of reducing the risk of offsite consequences insofar as reasonably practicable.797 The distances were not designed to completely eliminate the risks associated with offsite consequences, nor were they intended to replace preventive controls.798 The separation distances are categorized by a threshold quantity (i.e., whether FGAN is stored in quantities greater than or less than 10 metric tons). For instance, if FGAN exceeding 10 tons is stored at a facility, it must be separated by at least 300 meters (985 feet) from critical infrastructure, 240 meters (790 feet) from residential buildings, and 140 meters (460 feet) from commercial buildings.799 Western Australia seeks to address land use planning through a risk-based scheme that requires government permission to site FGAN facilities near public receptors. Depending on the quantity of FGAN stored, each facility must be sited at a minimum distance from such public receptors. Furthermore, if the facility is not sited at the required minimum distance, it might have to limit the maximum quantity of FGAN that it can store. A study of the risk associated with a particular facility might be required to reach agreement between the government and the facility on appropriate separation

795 Department of Consumer and Employment Protection Government of Western Australia. Safe Storage of Solid FGAN: Code of Practice: 8–10. See: https://miningandblasting.files.wordpress.com/2009/09/safe-storage-of-solid- ammonium-nitrate-code-of-practice.pdf (accessed on December 28, 2015). See also: http://www.dmp.wa.gov.au/6611.aspx (accessed on December 28, 2015). 796 Department of Consumer and Employment Protection Government of Western Australia. Safe Storage of Solid FGAN: Code of Practice: 8–10. See: https://miningandblasting.files.wordpress.com/2009/09/safe-storage-of-solid- ammonium-nitrate-code-of-practice.pdf (accessed on December 28, 2015). 797 Department of Consumer and Employment Protection Government of Western Australia. Safe Storage of Solid FGAN: Code of Practice: 8–10. See: https://miningandblasting.files.wordpress.com/2009/09/safe-storage-of-solid- ammonium-nitrate-code-of-practice.pdf. Government of Western Australia. Code of Practice: Safe Storage of solid FGAN, 3rd Edition: 6-7. See: http://www.dmp.wa.gov.au/Documents/Dangerous-Goods/DGS_COP_StorageSolidAmmoniumNitrate.pdf (accessed on December 29, 2015). Hazardous Industry Planning Advisory Paper No. 4—Risk criteria for land use safety planning. HIPAP4. See: http://www.planning.nsw.gov.au/Policy-and- Legislation/~/media/0D39F08E7889409BBA1FA88D5FB859FD.ashx (accessed on January 7, 2014). 798 Department of Consumer and Employment Protection Government of Western Australia. Safe Storage of Solid Ammonium Nitrate: Code of Practice: 8–10. See: https://miningandblasting.files.wordpress.com/2009/09/safe- storage-of-solid-ammonium-nitrate-code-of-practice.pdf (accessed on January 6, 2016). Government of Western Australia. Code of Practice: Safe Storage of solid ammonium nitrate, 3rd Edition: 6–7. See: http://www.dmp.wa.gov.au/Documents/Dangerous-Goods/DGS_COP_StorageSolidAmmoniumNitrate.pdf (accessed on December 29, 2015). 799 Government of Western Australia. Code of Practice: Safe Storage of solid ammonium nitrate, 3rd Edition: 6–7. See: http://www.dmp.wa.gov.au/Documents/Dangerous-Goods/DGS_COP_StorageSolidAmmoniumNitrate.pdf (accessed on December 29, 2015).

West Fertilizer Company Final Report January 2016 239 U.S. CHEMICAL SAFETY AND HAZARD INVESTIGATION BOARD

distances. This approach gives Western Australia the capability to balance the risk associated with storing FGAN against the need for land development. 9.4 Efforts to Address Land Use Planning After the West Incident In the weeks, months, and years following the West incident, few inroads have been made to resolve land use issues. The federal government has developed a working group that is tasked with developing recommendations related to chemical facility safety and security; however, the timeline for delivery has been extended.800 At the state level, general opposition remains to any type of change in the Texas approach to land use planning.801 In fact, strong opposition has contested any regulation of FGAN facilities in Texas.802 The city of West is currently awaiting recommendations from state and federal officials; however, it does plan on siting any new fertilizer facilities away from the community.803 The Texas State Fire Marshal’s Office (SFMO) has taken a proactive approach by providing all counties with software demonstrations that estimate blast zones from facilities storing FGAN.804 In addition to assisting first responders, the software gives community leaders the opportunity to assess community impacts relating to the siting of a new FGAN facility. In addition, the SFMO will assist each county in reviewing best practices for dealing with the storage and handling of FGAN. At the county level, the McLennan County Local Emergency Planning Committee (LEPC) has emphasized the importance of land use issues in agreeing to focus on “upfront planning” when siting community buildings such as schools or hospitals near chemical facilities.805 The LEPC has agreed to continue to meet quarterly. The city of West has also committed to advising other communities about identifying the potential hazards that they might face in locating chemical facilities near their towns and citizens.806 Applied Research Associates, Inc. (Applied Research) has engaged in an effort to understand and validate the separation distances prescribed in NFPA 400. After completing a literature review, Applied Research selected a consequence-based case study and developed a test plan. The firm then carried out the case

800 See: https://www.osha.gov/chemicalexecutiveorder/index.html (accessed on December 28, 2015). 801 See: http://www.nytimes.com/2013/05/10/us/after-plant-explosion-texas-remains-wary-of-regulation.html?_r=0 (accessed on December 28, 2015). 802 Henry, Terrence, NPR. “Proposals to Prevent Another Fertilizer Explosion Immediately Meet Resistance,” July 2,

  1. See: http://stateimpact.npr.org/texas/2014/07/02/proposals-to-prevent-another-fertilizer-explosion-

immediately-meet-resistance/ (accessed on December 8, 2014). The Associated Press. “New bill on West blast would delay new rules.” CBS DFW (August 5, 2014). See: http://dfw.cbslocal.com/2014/08/05/new-bill-on-west- blast-would-delay-new-rules/ (accessed on December 29, 2015). 803 See: http://res.dallasnews.com/interactives/2013_December/westretrospective/1215_westretrospective.html (accessed on December 28, 2015). 804 See: http://res.dallasnews.com/interactives/2013_December/westretrospective/1215_assessment.html (accessed on December 28, 2015). 805 Ibid. 806 Ibid.

West Fertilizer Company Final Report January 2016 240 U.S. CHEMICAL SAFETY AND HAZARD INVESTIGATION BOARD

study test plan to assess the adequacy of the separation distance for safe storage of AN and the safe separation distance for personnel in a process building in the event of an explosion. Applied Research then developed a series of recommendations regarding separation distances in NFPA 400, including possible approaches for improving those distances, to guide NFPA and its affiliated Fire Protection Research Foundation project panel in future research efforts.807 The city of West is currently rebuilding. The blast substantially damaged more than 350 homes, completely destroying 150 of them, and caused approximately $100 million in damages.808 The West High School has been razed, and a new school will be constructed on the same site.809 The site of the accident will likely become an industrial park.810 10.0 Key Findings Technical Findings

  1. The presence of combustible materials used for construction of the facility and the fertilizer grade

ammonium nitrate (FGAN) storage bins, in addition to the West Fertilizer Company (WFC) practice of storing combustibles near the FGAN pile, contributed to the progression and intensity of the fire and likely resulted in the detonation.

  1. The WFC facility did not have a fire detection system to alert emergency responders or an

automatic sprinkler system to extinguish the fire at an earlier stage of the incident.

  1. On the basis of interviews with eyewitnesses and supporting photographic evidence, the first

observed fire and smoke originated in and above the seed room and progressed throughout the northern half of the WFC facility. The radiant heat from the fire, fueled by the structure, flammable building contents, and the asphalt roof shingles, likely heated the surface of the FGAN pile. Contamination from soot, molten asphalt, and molten polyvinyl chloride (PVC) from an overhead conveyer produced a detonable mixture of combustibles and FGAN oxidizers. Increased ventilation generated a brighter and hotter flame, heating the FGAN-fuel mixture on the surface of the pile. Regulatory Findings

  1. Occupational Safety and Health Administration (OSHA) efforts to oversee facilities that store and

handle FGAN fell short at the time of the incident.

807 Fire Protection Research Foundation. “Separation Distances in NFPA Codes and Standards, 2014.” See: http://www.nfpa.org/Assets/files/AboutTheCodes/59A/RFSeparationDistancesNFPACodesAndStandards.pdf (accessed on September 25, 2015). 808 See: http://www.hazmatmag.com/news/in-harms-way/1002482923/ (accessed on January 6, 2016) and http://res.dallasnews.com/interactives/2013_December/westretrospective/1215_whatwelearned.html (accessed on December 28, 2015). 809 CBS. “DFW, West Getting New Schools After Explosion,” October 30, 2014. See: http://dfw.cbslocal.com/2014/10/30/west-getting-new-schools-after-explosion/ (accessed on December 6, 2014). 810 See: http://res.dallasnews.com/interactives/2013_December/westretrospective/1215_westretrospective.html (accessed on December 28, 2015).

West Fertilizer Company Final Report January 2016 241 U.S. CHEMICAL SAFETY AND HAZARD INVESTIGATION BOARD

a. Section (i) of the OSHA Explosives and Blasting Agents standard, 29 CFR 1910.109(i), was not very well known among those in the fertilizer industry, likely due in part to the fact that (1) application of the section was unclear; and (2) the section had rarely been used previously to cite fertilizer facilities. b. OSHA inadvertently omitted ammonium nitrate (AN) from the List of Highly Hazardous Chemicals, Toxics and Reactives in its Process Safety Management (PSM) standard, 29 CFR 1910.119, even though AN possesses reactive characteristics that would have triggered its inclusion.

  1. Because the WFC facility was covered under the U.S. Environmental Protection Agency (EPA)

Risk Management Program rule for its anhydrous ammonia tanks (but not for its FGAN), WFC employees and emergency responders demonstrated a greater awareness of the hazards associated with onsite storage of anhydrous ammonia than those associated with FGAN. AN is not on the EPA Risk Management Program list of chemicals, so the WFC was not required to take safety measures for FGAN similar to those for ammonia. Insurance Findings

  1. WFC’s previous property and liability insurer, which provided insurance to WFC from 2006

through 2009, did not focus on FGAN hazards in its annual insurance inspections because it was not required to do so. However, the insurer did not renew WFC’s commercial property policy in 2010 because WFC repeatedly failed to comply with the insurer’s safety-related recommendations (e.g., to replace corroded electrical wiring), which were identified in loss control surveys. The CSB found little evidence of onsite activity or inspections by WFC’s subsequent insurer, U.S. Fire, which insured the facility at the time of the incident. Emergency Response Findings

  1. The West Volunteer Fire Department (WVFD) did not conduct pre-incident planning or response

training at the WFC facility to address FGAN-related incidents because was no such regulatory requirement. Thus, the firefighters who responded to the WFC fire did not have sufficient information to make an informed decision on how best to respond to the fire at the fertilizer facility.

  1. Federal and state of Texas curriculum manuals used for hazardous materials (HAZMAT) training

and certification of firefighters placed little emphasis on emergency response to storage sites containing FGAN. On the other hand, HAZMAT shipping and transportation were covered frequently in the courses. Many federal and state grants support the resource needs of firefighters and fire departments; however, these grants are used more often for resources such as personal protection equipment or firefighting equipment rather than for training.

  1. Lessons learned from previous FGAN-related fires and explosions were not shared with volunteer

fire departments, including the WVFD. If previous lessons learned had been applied in West, the firefighters and emergency personnel who responded to the incident might have better understood the risks associated with FGAN-related fire.

West Fertilizer Company Final Report January 2016 242 U.S. CHEMICAL SAFETY AND HAZARD INVESTIGATION BOARD

Emergency Planning Findings

  1. Despite WFC documentation of its FGAN in a 2012 Tier II report, the WVFD did not conduct

drills and exercises at the WFC facility before the 2013 fire and explosion.

  1. The agricultural use exemption under the Emergency Planning and Community Right-to-Know

Act (EPCRA) is not clear about which facilities are covered under the exemption. Before the WFC fire and explosion, the state of Texas determined that the WFC was exempt under the EPCRA agricultural use exemption. Land Use Planning Findings

  1. At the time of its construction, the WFC facility was surrounded by open fields, and no zoning

regulations existed when it began operations.

  1. As the city of West developed over the years, it expanded toward the WFC facility.
  2. The proximity of the city of West to the WFC facility magnified the offsite consequence impacts.
  3. Other FGAN facilities throughout Texas are located in close proximity to schools, residences, and

care facilities. Of the 40 FGAN facilities in Texas as of October 2015, 48 percent are within 0.5 miles of a school, nursing home, or hospital while 83 percent are within 0.25 miles of a residence.

  1. 0 Recommendations

U.S. Environmental Protection Agency (EPA) 2013-02-I-TX R1

Develop a guidance document on Emergency Planning and Community Right-to-Know Act (EPCRA) requirements that is issued annually to State Emergency Response Commissions (SERCs) and Local Emergency Planning Committees (LEPCs) and ensure that the guidance focuses on the following: a. Explains which chemicals are exempt and which must be reported. b. Describes how emergency responders should use Tier I and Tier II inventory reports and Safety Data Sheets, such as in safety training, practice drills, and for emergency planning. c. Includes comprehensive LEPC planning requirements, with an emphasis on annual training exercises and drills for local emergency response agencies.

2013-02-I-TX R2

Develop a general guidance document on the agricultural exemption under EPCRA Section 311(e)(5) and its associated regulation, 40 CFR 370.13(c)(3), to clarify that fertilizer facilities that store or blend fertilizer are covered under EPCRA. Communicate to the fertilizer industry publication of this guidance document as well as the intention of Section 311(e)(5).

West Fertilizer Company Final Report January 2016 243 U.S. CHEMICAL SAFETY AND HAZARD INVESTIGATION BOARD

2013-02-I-TX R3

Revise the Risk Management Program rule to include fertilizer grade ammonium nitrate (FGAN) at an appropriate threshold quantity on the List of Regulated Substances. a. Ensure that the calculation for the offsite consequence analysis considers the unique explosive characteristics of FGAN explosions to determine the endpoint for explosive effects and overpressure levels. Examples of such analyses include that adopted by the 2014 Fire Protection Research Foundation report, “Separation Distances in NFPA Codes and Standards,” Great Britain’s Health and Safety Executive, and other technical guidance. b. Develop Risk Management Program rule guidance document(s) for regulated FGAN facilities. U.S. Occupational Safety and Health Administration (OSHA) 2013-02-I-TX R4

Develop and issue a Regional Emphasis Program for Section (i) of the Explosives and Blasting Agent standard, 29 CFR 1910.109(i), in appropriate regions (such as Regions IV, VI, and VII) where fertilizer grade ammonium nitrate (FGAN) facilities similar to the West Fertilizer Company facility are prevalent. Establish a minimum number of emphasis program inspections per region for each fiscal year. Work with regional offices to communicate information about the emphasis program to potential inspection recipients.

2013-02-I-TX R5

Implement one of the following two regulatory changes, either option (a) or (b) below, to address FGAN hazards: a. Add FGAN to the OSHA Process Safety Management (PSM) standard List of Highly Hazardous Chemicals, Toxics and Reactives in 29 CFR 1910.119, Appendix A, and establish an appropriate threshold quantity. Identify National Fire Protection Association (NFPA) 400 as a source of Recognized and Generally Accepted Good Engineering Practices (RAGAGEP) for PSM-covered FGAN equipment and processes. b. Revise the OSHA Explosives and Blasting Agents standard, 29 CFR 1910.109, to ensure that the title, scope, or both make(s) clear that the standard applies to facilities that store bulk quantities of FGAN. Revise 1910.109(i), “Storage of Ammonium Nitrate,” to include requirements similar to those in NFPA 400, Hazardous Materials Code (2016 Edition), Chapter 11. Ensure the following elements are considered: i. For new construction, prohibit combustible materials of construction for FGAN facilities and FGAN bins. For existing facilities, establish a phase-in requirement for the replacement of wooden bins with bins made of noncombustible materials of construction within a reasonable time period (e.g., 3 to 5 years from the date standard revisions are enacted), based on feedback from the fertilizer industry. ii. Require automatic fire sprinkler systems and fire detection systems for indoor FGAN storage areas.

West Fertilizer Company Final Report January 2016 244 U.S. CHEMICAL SAFETY AND HAZARD INVESTIGATION BOARD

iii. Define adequate ventilation for FGAN for indoor storage areas. iv. Require all FGAN storage areas to be isolated from the storage of combustible, flammable, and other contaminating materials. v. Establish separation distances between FGAN storage areas and other hazardous chemicals, processes, and facility boundaries. International Code Council (ICC) 2013-02-I-TX R6

In a subsequent edition of the International Fire Code, develop a chapter or a separate section under Chapter 50 (“Hazardous Materials”) or Chapter 63 (“Oxidizers, Oxidizing Gases and Oxidizing Cryogenic Fluids”) that includes the following requirements for the storage and handling of ammonium nitrate (AN): a. Require automatic fire detection and suppression systems in existing buildings constructed of combustible materials b. Provide ventilation requirements in accordance with the International Mechanical Code to prevent the accumulation of off-gases produced during AN decomposition c. Provide smoke and heat vents to remove heat from AN during fire situations d. Establish minimum safe separation distances between AN and combustible materials to avoid contamination in the event of fire. e. Prohibit the use of combustible materials of construction. Department of Homeland Security, Federal Emergency Management Agency (FEMA) 2013-02-I-TX R7

Through a new or existing program and in conjunction with training partners, create and implement a competitive funding mechanism to provide training to regional, state, and local career and volunteer fire departments on how to respond to fire and explosion incidents at facilities that store fertilizer grade ammonium nitrate (FGAN). Continue to use available funding to ensure training effectiveness.

2013-02-I-TX R8

During the proposal review process for the program, ensure that the FGAN training includes multiple delivery methods to enable a broad reach. Training should allow for instructor-led, web- based, and train-the-trainer courses; initial orientation; and refresher training. Training also should accommodate both resident and mobile capabilities to facilitate flexible delivery.

Objectives of the selected training course should address the following: a. Previous FGAN fire and explosion incidents, incorporating lessons learned b. Hazards posed by other materials and chemicals stored near FGAN, including FGAN incompatibility with those materials and chemicals

West Fertilizer Company Final Report January 2016 245 U.S. CHEMICAL SAFETY AND HAZARD INVESTIGATION BOARD

c. Pre-incident planning for fires involving FGAN d. On-scene emergency response and decision-making requirements for FGAN fires, including risk assessment, scene size-up, and situational awareness e. National Incident Management System and Incident Command System.

2013-02-I-TX R9

Assist training partners to develop and provide continual oversight for an FGAN training program. In addition, evaluate the training curriculum to confirm that it adequately meets course objectives as well as the details of recommendation 2013-02-I-TX R8.

2013-02-I-TX R10

Develop an outreach program that notifies regional, state, and local fire departments about available FGAN training opportunities. The program should include the following: a. Guidance for fire departments on how to identify FGAN hazards within their communities by engaging State Emergency Response Commissions and Local Emergency Planning Committees b. Details on how to obtain FGAN training by submitting a proposal in response to the funding opportunity c. Information on training partners and programs that provide FGAN training. Texas Commission on Fire Protection (TCFP) 2013-02-I-TX R11

Develop minimum standards for course curricula to include hazard awareness of fertilizer grade ammonium nitrate (FGAN) for those fire departments that either have FGAN facilities in their jurisdictions or respond as mutual aid to other jurisdictions with FGAN facilities. In addition, develop a training program specific to FGAN.

Objectives of the program’s training course should address the following: a. Previous FGAN fire and explosion incidents, incorporating lessons learned b. Hazards posed by other materials and chemicals stored near FGAN, including FGAN incompatibility with those materials and chemicals c. Pre-incident planning for fires involving FGAN d. On-scene emergency response and decision-making requirements for FGAN fires, including risk assessment, scene size-up, and situational awareness e. National Incident Management System and Incident Command System.

2013-02-I-TX R12

Implement outreach to regional, state, and local fire departments that either have FGAN facilities in their jurisdictions or respond as mutual aid to jurisdictions with FGAN facilities, informing them about the new FGAN training certification requirements and opportunities to receive training. Include the following in the outreach:

West Fertilizer Company Final Report January 2016 246 U.S. CHEMICAL SAFETY AND HAZARD INVESTIGATION BOARD

a. Guidance for fire departments on how to identify FGAN hazards within their communities by engaging State Emergency Response Commissions and Local Emergency Planning Committees b. Encouragement for fire departments in jurisdictions with FGAN facilities to become certified in FGAN training. State Firefighters’ and Fire Marshals’ Association of Texas (SFFMA) 2013-02-I-TX R13

Develop a fertilizer grade ammonium nitrate (FGAN) training certification program for fire departments that either have FGAN facilities in their jurisdictions or respond as mutual aid to other jurisdictions with FGAN facilities. The certification program should include multiple delivery methods to enable a broad reach. The certification program should allow for instructor- led, web-based, and train-the-trainer courses; initial orientation; and refresher training. The training also should accommodate both resident and mobile capabilities to facilitate flexibility in delivery.

The criteria for the certification program should address the following: a. Previous FGAN fire and explosion incidents, incorporating lessons learned b. Hazards posed by other materials and chemicals stored near FGAN, including FGAN incompatibility with those materials and chemicals c. Pre-incident planning for fires involving FGAN d. On-scene emergency response and decision-making requirements for FGAN fires, including risk assessment, scene size-up, and situational awareness e. National Incident Management System and Incident Command System.

2013-02-I-TX R14

Develop an outreach component for the training certification program that notifies regional, state, and local fire departments with FGAN facilities in their jurisdictions about the training certification opportunities available for FGAN. Ensure that the following items are included in the development of this program: a. Guidance for fire departments on how to identify FGAN hazards within their communities by engaging State Emergency Response Commissions and Local Emergency Planning Committees b. Encouragement for members in jurisdictions with FGAN facilities to become certified in FGAN training c. Information on training partners and programs that provide FGAN training. Texas A&M Engineering Extension Services (TEEX) 2013-02-I-TX R15

West Fertilizer Company Final Report January 2016 247 U.S. CHEMICAL SAFETY AND HAZARD INVESTIGATION BOARD

Develop and administer a hazardous materials training module for career and volunteer fire departments that addresses fertilizer grade ammonium nitrate (FGAN) and other hazardous materials or chemicals that could pose new specialized hazards. Ensure that the training includes multiple delivery methods to enable a broad reach. The training should allow for instructor-led, web-based, and train-the-trainer courses; initial orientation; and refresher training. The training also should accommodate both resident and mobile capabilities to facilitate flexibility in delivery.

Objectives of the training course should address the following: a. How to respond to industrial fires involving FGAN and other hazardous materials or chemicals that could pose new specialized hazards to responding firefighters b. Previous FGAN fire and explosion incidents, incorporating lessons learned c. Hazards posed by other materials and chemicals stored near the FGAN, including FGAN incompatibility with those materials and chemicals d. Pre-incident planning for fires involving FGAN and other hazardous materials or chemicals that could pose new specialized hazards to responding firefighters e. On-scene emergency response and decision-making requirements for FGAN fires, including risk assessment, scene size-up, and situational awareness f. National Incident Management System and Incident Command System.

2013-02-I-TX R16

Develop an outreach program that notifies state, regional, and local fire departments about available FGAN training opportunities. The program should include the following elements: a. Guidance for fire departments on how to identify FGAN and other recognized hazards associated with other hazardous materials or chemicals within their communities by engaging with State Emergency Response Commissions and Local Emergency Planning Committees b. Promotion of use of the hazardous materials training module with TEEX training partners. Texas Department of Insurance (TDI) 2013-02-I-TX R17

For companies that provide insurance to agricultural facilities storing bulk fertilizer grade ammonium nitrate (FGAN) in Texas, including surplus lines insurers and Texas-registered risk retention groups, develop and issue guidance to assist in underwriting risk and conducting annual loss control surveys. Guidance should include the following: a. Combustible materials of construction for facilities and bins storing FGAN b. Storage of combustible materials near FGAN piles c. Adequate ventilation for indoor FGAN storage areas d. Automatic sprinklers and smoke detection systems for indoor FGAN storage areas e. Separation distances between FGAN and other hazardous materials onsite

West Fertilizer Company Final Report January 2016 248 U.S. CHEMICAL SAFETY AND HAZARD INVESTIGATION BOARD

f. Potential for offsite consequences from a fire or explosion, including the proximity of FGAN facilities to nearby residences, schools, hospitals, and other community structures. Provide references in the guidance document to existing materials from the following sources or to other equivalent guidance: a. National Fire Protection Association (NFPA), NFPA 400, Hazardous Materials Code, 2016 Edition, Chapter 11, “Ammonium Nitrate” b. FM Global, “Property Loss Prevention Data Sheet 7-89” c. U.S. Environmental Protection Agency, Occupational Safety and Health Administration, and Bureau of Alcohol, Tobacco, Firearms and Explosives; “Chemical Advisory: Safe Storage, Handling, and Management of Solid Ammonium Nitrate Prills” d. TDI, “Best Practices for the Storage of Ammonium Nitrate” e. National Fire Protection Research Foundation, “Separation Distances and NFPA Codes and Standards.” West Volunteer Fire Department (WVFD) 2013-02-I-TX R18

Develop standard operating procedures for pre-incident planning for facilities that store or handle hazardous materials such as fertilizer grade ammonium nitrate (FGAN). El Dorado Chemical Company (EDC) 2013-02-I-TX R19

For all distributors and bulk retail sites (i.e., customers) that receive fertilizer grade ammonium nitrate (FGAN) manufactured by El Dorado Chemical Company (EDC) for storage, shipment, and sale: a. Encourage customers to conduct internal monitoring and auditing (in accordance with recent industry standards and guidelines) in locations where FGAN will be stored or used. Communicate that such internal monitoring and auditing may be conducted through established product safety programs, including ResponsibleAg. b. Develop a process to establish mutual product stewardship expectations for the downstream chain of customers. Communicate expectations to existing customers, and to new customers before their first shipment of FGAN. Include the following components: i. For all FGAN sold to distributors, encourage distributors to provide Safety Data Sheets and FGAN safety guidance to their customers and bulk retail sites to which FGAN is sold or shipped ii. For all EDC bulk retailers and non-EDC bulk retailers that store and sell FGAN, encourage bulk retailers to address, such as through certification checklists, the following: • Written procedures for the safe handling of FGAN, including employee training

West Fertilizer Company Final Report January 2016 249 U.S. CHEMICAL SAFETY AND HAZARD INVESTIGATION BOARD

• Emergency response plans to be sent to Local Emergency Planning Committees and local fire departments • Tier II Chemical Inventory Report submissions. This signature block is placed immediately after the last recommendation. By the U.S. Chemical Safety and Hazard Investigation Board

Vanessa Allen Sutherland

Chair

Kristen Kulinowski

Member

Manuel Ehrlich

Member

Richard Engler

Member

Date of Board Approval

West Fertilizer Company Final Report January 2016 250 U.S. CHEMICAL SAFETY AND HAZARD INVESTIGATION BOARD

  1. 0 Appendix A: Rebuilding of the West Independent School

District The West Independent School District (WISD) ultimately decided to demolish the West Intermediate School (WIS),1 West High School (WHS), and approximately half of West Middle School (WMS) based on the level of damage to these buildings. The WISD is rebuilding by constructing a combined middle school and high school consisting of a common entryway, cafeteria, and auditorium but separate offices and gymnasiums for each school. The left side of the structure will accommodate the middle school students (grades 6 through 8), and the right side will serve high school students (grades 9 through 12). Table 16 shows the distribution of grade levels within the old facilities and the new facilities. Groundbreaking took place on October 30, 2014, and construction began shortly thereafter; the WISD expects the school to open in September 2016. The new West Middle School/West High School will be located on the same site as the previous WHS campus. The site will house the WISD baseball field, softball field, eight-lane running track and facilities for field events, two practice fields, four tennis courts, and supporting concession and restroom facilities.2 Although the city demolished the WIS campus, the existing site paving remained in place so that it could serve as temporary parking for the WISD transportation department. The former WIS site currently houses a donated metal building used for agriculture shop for WHS students3 but could potentially become the final location of the WISD transportation, maintenance, and receiving facility.

1 WIS will not be rebuilt. 2 See: http://www.restorewestisd.com/assets/sd_west-hs-ms-final-web.pdf (accessed on December 30, 2015). 3 The donated metal building is approximately a block and a half from the temporary high school; however, it would take up too much instructional time for students to walk there, so buses take each class to the shop on days when students participate in agriculture class.

West Fertilizer Company Final Report January 2016 251 U.S. CHEMICAL SAFETY AND HAZARD INVESTIGATION BOARD

Table 16. Distribution of Grade Levels at the Old and New WISD Schools School Old Facilities (Grades) New Facilities (Grades) West Intermediate School 4 and 5 Not rebuilt West Middle School 6 and 7 6 through 8 West High School 7 through 12 9 through 12 West Elementary School K through 3 K through 5

During the rebuild, the WISD created a temporary campus for middle and high school students, ultimately locating it on the existing middle school site. Students in grades pre-K through 5 attended school at West Elementary School, which sustained minimal damage in the explosion. Students in grades 6 through 12 were housed in temporary facilities at the existing WMS site.4 The sixth graders from WMS initially transferred to portable structures behind the elementary school until the end of the school year before moving to the middle school site for the 2013–2014 school year. The students in grades 7 through 12 moved to empty buildings owned by the Connally Independent School District,5 which is about 9 miles south of West, from April 17, 2013, until the end of the school year. Although the physical location of classes changed, WISD teachers still taught these students, who were still enrolled in the WISD. In August 2013, all of the students in grades 7 through 12 returned to West for classes in modular and portable buildings, and they eventually will transfer to the new school once the rebuild is complete. The temporary middle school and high school site consisted of 17 temporary portable facilities, 10 portable facilities donated by surrounding school districts that were leased by the WISD, and a temporary structure to cover the existing foundation and floor system saved from the original practice gymnasium.6 FEMA provided the WISD with a grant totaling nearly $20.8 million to assist in providing secure temporary classrooms and administrative buildings to replace those that were destroyed.7 The FEMA grant will pay the federal share, or 75 percent, of the eligible costs for the rebuild, and the WISD will

4 See: http://www.restorewestisd.com/plans.html (accessed on December 30, 2015). 5 Connally Independent School District is a Texas public school district located in central McLennan County, serving the cities of Lacy, Lakeview, and Waco as well as the communities of Elm Mott, Chalk Bluff, and Gholson. 6 See: http://www.restorewestisd.com/plans.html (accessed on December 30, 2015). 7 See: http://www.fema.gov/news-release/2013/08/01/fema-obligates-nearly-28-million-west-texas-independent- school-district (accessed on December 30, 2015). See: http://www.wfaa.com/story/local/2015/07/06/14167886/ (accessed on December 30, 2015).

West Fertilizer Company Final Report January 2016 252 U.S. CHEMICAL SAFETY AND HAZARD INVESTIGATION BOARD

cover the remaining 25 percent of the cost. The remaining cost to rebuild will be funded by the Texas Education Agency, which is providing the WISD with almost $10.3 million in Foundation School Program funds. At the time of the incident, the WISD was insured for $58 million. The school district received $30 million from the Argonaut Insurance Company, the WISD’s insurance carrier at the time of the explosion; however, WISD assessments indicate that the damage to its four schools far exceeded $30 million. Currently, the WISD is in litigation with Argonaut Insurance Company,8 Trident Insurance Services LLC,9and the Texas Association of Public Educators.10 Based on a district assessment and planning presentation to the WISD Board of Trustees on April 29, 2013, the proposed cost for rebuilding temporary facilities and renovating the facilities damaged by the explosion would amount to $16,562,706.11 This Phase One cost estimate for temporary facilities and renovations includes the following: • Existing administrative and office building renovations. • High school football stadium renovations. • Existing middle school site (1967 gymnasium repair, 1923 and 1957 building weatherization, maintenance and transportation building replacement). • Existing elementary school cafeteria additions and building renovations. • WISD-wide demolition and temporary classrooms. • Loose equipment moving and temporary storage. • WISD-wide technology connectivity. • Contingency funds. The initial proposed estimated cost for Phase Two rebuilding—including a new high school, new intermediate and middle school, new track and field facility, new maintenance and transportation permanent replacement building and contingency, and program financial audit—was $100,791,719.12 13.0 Appendix B: FGAN Incidents Tables Appendix B provides two tables, both depicting incidents involving FGAN. CSB listed only those incidents that it could confirm. As such, these lists are not meant to be comprehensive. The first table

8 Argonaut Insurance provides specialty property and casualty insurance and is a subsidiary of Argo Group International Holdings, Ltd. 9 Trident Insurance Services is a specialty commercial insurance provider for small- to middle-market public sector entities; it served as the administrator and adjustor for the insurance policy sold by Argonaut Insurance Company. 10 The Texas Association of Public Educators is a nonprofit organization managed by Argonaut Insurance Company to assist in the procurement of insurance and the administration of claims for school districts. 11 See: http://www.restorewestisd.com/assets/west-isd-presentation_final-sm.pdf (accessed on December 30, 2015). 12 See: http://www.restorewestisd.com/assets/west-isd-presentation_final-sm.pdf (accessed on December 30, 2015).

West Fertilizer Company Final Report January 2016 253 U.S. CHEMICAL SAFETY AND HAZARD INVESTIGATION BOARD

(Table 17) provides only those FGAN incidents that occurred at stationary sites. The second table (Table 18) shows all other FGAN incidents, many of which are transportation-related. The incidents are listed chronologically. Date, location, and a brief description of each incident are provided. For transportation incidents, the location given is the location where the incident occurred. An indication of whether the incident involved fire and/or explosion is also included. Quantity, or mass, of FGAN involved in each incident is provided as well. This information may or may not reflect the quantity of FGAN that actually caught fire and/or detonated. Where available, a description of casualties and property damage is given. Where information could not be found or determined, entries appear blank. Of the 32 total confirmed FGAN incidents researched by CSB, 22 occurred at stationary sites. At least 654 fatalities resulted from these stationary-site incidents. Thousands were injured and/or evacuated. Of the 10 FGAN incidents that occurred at non-stationary sites, at least 823 were fatally injured. Again, thousands were injured and/or evacuated.

West Fertilizer Company Final Report January 2016 254 Table 17. FGAN Incidents at Stationary Sites Date Location Description Fire Explosion Quantity (lbs) Casualties Property Damage References 14-Jan- 1916 Gibbstown NJ, USA Explosion occurred in evaporating pan

x 4K • One fatality • 12 injured Plant property heavily damaged 1 21-May -1921 Oppau, Germany Detonation involved FGAN and ammonium sulfate mixture or hidden explosives

x 900K • 561 fatalities • 2,000 injured Buildings flattened 2 1-Mar- 1924 New Brunswick (Nixon), NJ Explosion occurred at fertilizer building x x

• At least 20 fatalities • A dozen missing

3 5-Aug- 1940 Miramas, France Explosion of freight car launched explosive shell into burning mixture of FGAN and toluene at storage building x x 480K

4 26-Aug- 1947 Presque Isle, ME Fire involving fertilizers occurred

x

5

1 NFPA. Quarterly of the NFPA, Vol. 16, No. 1. July 1922. See: https://books.google.com/books?id=- MAdAQAAIAAJ&printsec=frontcover&source=gbs_ge_summary_r&cad=0#v=onepage&q&f=false (accessed on December 30, 2015). 2 Oxley, J.C. et al. “AN: thermal stability and explosivity modifiers.” Thermochimica Acta 384 (2002): 23–45. 3 See: http://query.nytimes.com/gst/abstract.html?res=9E05EEDD1E3CE733A25751C0A9659C946595D6CF (accessed on December 31, 2015). 4 See: http://www.societechimiquedefrance.fr/extras/Guiochon%20VO/exinvolontaireVO.htm (accessed on December 31, 2015). 5 Oxley, J.C. et al. “AN: thermal stability and explosivity modifiers.” Thermochimica Acta 384 (2002): 23–45.

West Fertilizer Company Final Report January 2016 255 Date Location Description Fire Explosion Quantity (lbs) Casualties Property Damage References 1-Sep- 1947 St. Stephens, Canada Fire occurred in warehouse containing bagged FGAN

x

800K

6 14-Oct- 1949 Independence, KS Fire occurred in warehouse next to storage building containing FGAN piled in paper bags

x

  1. 8– 5.4 million

7 9-Nov- 1966 Mt. Vernon, MO Explosion involving bagged FGAN occurred x x 100K

8 c. 1967 USA Screw conveyor shaft for FGAN burst after welding operation x x

9 c. 1973 Cherokee, OK Severe storage fire occurred in wooden FGAN storage area x x 28 million None injured

10 c. 1978 Rocky Mountain, NC Fire occurred at storage facility containing FGAN

x

1 million

Storage facility destroyed by fire 11

6 Ibid. 7 Ibid. 8 Ibid. 9 ABS Consulting. “West Fertilizer Incident Support Services Final Report.” August 28, 2015. 10 Marlair, G., and M.A. Kordek. “Safety and security issues relating to low capacity storage of AN-based fertilizers.” Journal of Hazardous Materials 123(1–3) (2005): 13–28. 11 Oxley, J.C. et al. “AN: thermal stability and explosivity modifiers.” Thermochimica Acta 384 (2002): 23–45.

West Fertilizer Company Final Report January 2016 256 Date Location Description Fire Explosion Quantity (lbs) Casualties Property Damage References c. 1979 Moreland, ID Fire involved wood framework and belting of overhead conveyor system in fertilizer plant while being used to unload railroad car of FGAN

x

400K

Fire spread to roof 12 c. 1982 United Kingdom Fire in warehouse where wooden furniture stored near FGAN resulted in deflagration x x 6 million 750–1,000 evacuated

13 13-Dec- 1994 Port Neal, IA Two explosions occurred at the Terra Industries AN plant

x

• Four fatalities • 18 injured • Anhydrous ammonia released • Ground water under plant contaminated 14 6-Jan- 1998 Xingping, Shaanxi, China Explosions occurred at fertilizer company

x

• 24 fatalities • 56 injured

12 Boggs, Thomas L. et al. “Realistic Safe-Separation Distance Determination for Mass Fire Hazards.” Naval Air Warfare Center Weapons Division. March 2013. 13 Nygaard, Erik C. et al. “Safety of Ammonium Nitrate.” International Society of Explosives Engineers. Vol. 2, 2006. See: https://miningandblasting.files.wordpress.com/2009/09/safety-of-ammonium-nitrate.pdf (accessed on January 4, 2016). 14 Boggs, Thomas L. et al. “Realistic Safe-Separation Distance Determination for Mass Fire Hazards.” Naval Air Warfare Center Weapons Division. March 2013.

West Fertilizer Company Final Report January 2016 257 Date Location Description Fire Explosion Quantity (lbs) Casualties Property Damage References 21-Sep- 2001 Toulouse, France Explosion occurred in warehouse containing FGAN and TGAN

x 400 – 600 K (TGAN+FGAN) • 29 fatalities • Nearly 2,500 injured, 30 of which severe Severe damage to plant and surrounding community 15 Jan- 2003 Cartagena, Murcia, Spain Fertilizer storage facility held self-sustained detonation fire x x

16 Oct- 2003 Saint-Romain- en-Jarez, France Fire occurred in end user storage facility containing FGAN in bags x x 10K Three heavily injured

17 30-Jul- 2009 Bryan, TX Fertilizer plant caught fire x

Over 80,000 evacuated

18

15 Nygaard, Erik C. et al. “Safety of Ammonium Nitrate.” International Society of Explosives Engineers. Vol. 2, 2006. See: https://miningandblasting.files.wordpress.com/2009/09/safety-of-ammonium-nitrate.pdf (accessed on January 4, 2016). 16 Boggs, Thomas L. et al. “Realistic Safe-Separation Distance Determination for Mass Fire Hazards.” Naval Air Warfare Center Weapons Division. March 2013. 17 Marlair, G., and M.A. Kordek. “Safety and security issues relating to low capacity storage of AN-based fertilizers.” Journal of Hazardous Materials 123(1–3) (2005): 13–28. 18 Boggs, Thomas L. et al. “Realistic Safe-Separation Distance Determination for Mass Fire Hazards.” Naval Air Warfare Center Weapons Division. March 2013.

West Fertilizer Company Final Report January 2016 258 Date Location Description Fire Explosion Quantity (lbs) Casualties Property Damage References 17-Apr- 2013 West, TX Fire and explosion occurred at fertilizer plant x x 80 – 100 K • 15 fatalities • Over 236 injured • Facility destroyed • Widespread damage to over 150 offsite buildings, including high school, middle school, intermediate school, apartment complex, and nursing home • Early estimates placed property damage at over $100 million

29-May- 2014 Athens, TX Fertilizer warehouse containing FGAN caught fire and burned x

19 12-Aug- 2015 Tianjin, China Hazardous materials storage warehouse containing AN* caught fire and exploded x x

Over 100 fatalities

20

19 Babrauskas, Vytenis. “Explosions of ammonium nitrate fertilizer in storage or transportation are preventable accidents.” Journal of Hazardous Materials (2015). 20 See: http://www.theguardian.com/world/2015/aug/18/tianjin-blasts-warehouse-handled-toxic-chemicals-without-licence-reports (accessed on January 19, 2016)

West Fertilizer Company Final Report January 2016 259 Table 18. Non-Stationary FGAN Incidents Date Location Description Fire Explosion Quantity (lbs) Casualties Property Damage References 16-Apr- 1947 Texas City, TX Fire occurred in hold of ship and detonated x x 4–11 million • Approximately 500 fatalities • Approximately 3,000 injured • 2,000 left homeless

• Commercial and residential buildings damaged or destroyed • Ships destroyed • Two planes knocked out of sky • Barge lifted out of water • Early property damage total estimated at approximately $40 million 21 23-Jan- 1953 Red Sea, Israel Spontaneous ignition of paper bags containing FGAN on ship x x 8–16 K

Ship destroyed 22 17-Dec- 1960 Traskwood, AR Explosion occurred in cars containing FGAN, petroleum, and paper x x 80—100 K

23

21 NFPA. “The Texas City Disaster.” The Quarterly. July 1947. 22 Oxley, J.C. et al. “AN: thermal stability and explosivity modifiers.” Thermochimica Acta 384 (2002): 23–45. 23 Ibid.

West Fertilizer Company Final Report January 2016 260 Date Location Description Fire Explosion Quantity (lbs) Casualties Property Damage References 1972 Taroon, Australia Transport of low density bagged AN prills involved in fire and explosion x x

Three fatalities

24 c. 1997 Brazil Delayed explosion occurred involving truck loaded with FGAN that caught fire due to nearby petrol tanker x x

25 c. 2000 FL Collision occurred between AN truck and gasoline tanker

x

26 18-Feb- 2004 Neyshabur, Khorasan, Iran Fire and explosion resulted from derailment of train containing bagged FGAN x x 840K 300 fatalities

27 Feb- 2004 Barracas, Spain Accident occurred during road transport of FGAN x x 50K • Two fatalities • Three injured

28

24 Marlair, G., and M.A. Kordek. “Safety and security issues relating to low capacity storage of AN-based fertilizers.” Journal of Hazardous Materials 123(1–3) (2005): 13–28. 25 Ibid. 26 Ibid. 27 Nygaard, Erik C. et al. “Safety of Ammonium Nitrate.” International Society of Explosives Engineers. Vol. 2, 2006. See: https://miningandblasting.files.wordpress.com/2009/09/safety-of-ammonium-nitrate.pdf (accessed on January 4, 2016). 28 Marlair, G., and M.A. Kordek. “Safety and security issues relating to low capacity storage of AN-based fertilizers.” Journal of Hazardous Materials 123(1–3) (2005): 13–28.

West Fertilizer Company Final Report January 2016 261 Date Location Description Fire Explosion Quantity (lbs) Casualties Property Damage References May- 2004 Near Bucharest, Romania Truck accident occurred during road transport of bagged FGAN x x 50K At least 18 fatalities

29 17-Feb- 2007 Estaca de Bares, Spain Self-sustained decomposition fire of nitrogen, phosphorous, potassium (NPK) fertilizer occurred in cargo of ship x

  1. 024

million (NPK)

30

29 Ibid. 30 Boggs, Thomas L. et al. “Realistic Safe-Separation Distance Determination for Mass Fire Hazards.” Naval Air Warfare Center Weapons Division. March 2013.

West Fertilizer Company Final Report January 2016 262 14.0 Appendix C: TFI Safety and Security Tools The Fertilizer Institute (TFI) offers a wide variety of tools designed to support the fertilizer industry. Most of these tools are information based and readily accessible online; some of the tools, however, are also interactive, allowing for personalization and customization. These tools include the following: • Access to a new online Compliance Assessment Tool. • General fertilizer retail industry information resources, such as industry fact sheets, fertilizer product fact sheets, and infographics. • New fertilizer grade ammonium nitrate (FGAN) guidelines, “Safety and Security Guidelines for the Storage and Transportation of Fertilizer Grade Ammonium Nitrate at Retail Facilities.” • An educational brochure, “America’s Security Begins with You,” designed to alert the agriculture community of the dangers associated with ammonium nitrate (AN) if it ends up in the wrong hands. • A brochure, “Health Effects of Ammonia,” discussing the sources and uses of ammonia as well as how the body processes it. • Newly updated liquid fertilizer guidelines, “Aboveground Storage Tanks Containing Liquid Fertilizer–Recommended Mechanical Integrity Practices,” which provides recommended uniform industry inspection and maintenance procedures for aboveground storage tanks of liquid fertilizer.1 • An anhydrous ammonia brochure, “Recommended Practices for Loading/Unloading Anhydrous Ammonia Rail Tank Cars in North America–Reduce and Eliminate Non-Accidental Release,” accompanied by an associated DVD. • Access to a new nonprofit organization, ResponsibleAg, an industry-led stewardship2 initiative founded to promote the public welfare by helping agribusinesses comply with safety and security rules regarding the handling and storage of fertilizer products.3 • Access to a multimedia safety training program, the “Anhydrous Ammonia Training Tour,” developed through TFI sponsorship of the Transportation Community Awareness and Emergency Response and focused on the provision of pertinent information regarding the properties of ammonia, steps that should be taken to ensure safe transport of ammonia, appropriate emergency response measures in case of an ammonia release, and hands-on training.4 • Access to free web-based anhydrous ammonia safety training, composed of subject-based training modules on (1) properties of ammonia, (2) personal protective equipment, (3) transportation of ammonia to and from the field, (4) safe hook-up of ammonia tanks in the field, and (5) emergency response and first aid procedures.5

1 See: http://www.tfi.org/safety-and-security-tools/recommended-mechanical-integrity-guidelines-aboveground- storage-tanks-liqu (accessed on December 30, 2015). 2 Merriam-Webster defines a stewardship as “the activity or job of protecting and being responsible for something.” 3 See: http://www.responsibleag.org/FAQ.cgi (accessed on December 30, 2015). 4 See: http://www.tfi.org/safety-and-security-tools/transcaer%C2%AE-anhydrous-ammonia-safety-training (accessed on December 30, 2015). 5 See: http://www.tfi.org/safety-and-security-tools/web-based-anhydrous-ammonia-safety-training (accessed on December 30, 2015).

West Fertilizer Company Final Report January 2016 263 • Access to a web-based compliance tool, myRMP Suite of Guidance Materials, a revised version of the Retail Guidance Document for Agricultural Retailers supported by the U.S. Environmental Protection Agency.6 • A new suite of second-generation web-based tools, mySPCC Suite of Guidance Materials Version 2.0, developed exclusively to assist agricultural retailers in implementing their Spill Prevention, Control, and Countermeasures (SPCC) plans, which enables the personalization of such plans to specific facilities and incorporates base information from the SPCC rule with accumulated knowledge gained by industry over the last 20 years.7

6 See: http://www.tfi.org/safety-and-security-tools/myrmp (accessed on December 30, 2015). 7 See: https://www.asmark.org/mySPCC/ (accessed on December 30, 2015).

West Fertilizer Company Final Report January 2016 264 15.0 Appendix D: ResponsibleAg As part of the ResponsibleAg program, participating facilities undergo an audit once every 3 years, and as many as 17 areas of a facility (e.g., dry fertilizer, liquid fertilizer, anhydrous ammonia, shop, office, and grounds) are assessed.1 Within 24 hours after completing the audit, the auditor enters findings into a secure portal on the ResponsibleAg website.2 Once the information is processed, the participating facility receives a corrective action plan if applicable, detailing any issues detected during the audit.3 This plan not only lists the issues discovered but also provides information on how to correct the issues and a recommended time frame for doing so.4 At the end of the recommended period of time, the auditor visits the facility again for a verification audit. The participating facility obtains certification only after all outstanding issues are addressed.5 To ensure a high level of reliability, a statistically valid sample of all participating facilities receives random verification from an independent auditor, approved by ResponsibleAg, every year.6 An annual accountability report includes the number of registered facilities, credentialed auditors, completed assessments, and random verifications.

1 See: http://www.responsibleag.org/About.cgi (accessed on December 30, 2015). 2 Ibid. 3 Ibid. 4 Ibid. 5 Ibid. 6 See: http://www.tfi.org/node/736 (accessed on January 6, 2016). See also: https://www.responsibleag.org/documents/RAHandout.pdf (accessed on December 30, 2015).

FD06460 | 2013_美国_West_肥料_爆炸_与火灾-_West_Fertilizer_Explosion_and_Fire__最终报告_2.pdf

分类:06_境外及港澳台调查报告 | 年份:2013 | 地域: | 严重程度: | 场所: | 起火原因:燃气/爆炸 | 来源格式:pdf

1

Testimony of Rafael Moure-Eraso, Ph.D. Chairperson, U.S. Chemical Safety Board Before the U.S. Senate Committee on Environment and Public Works June 27, 2013

Chairman Boxer, Ranking Member Vitter, and distinguished members of the Committee – thank you for the opportunity to testify before you this morning. I am Dr. Rafael Moure-Eraso, and I am providing this testimony in my capacity as chairperson of the U.S. Chemical Safety Board, or CSB.

The CSB is an independent federal agency that investigates major chemical accidents and hazards, and develops safety recommendations to prevent their recurrence in the future. The Board is a non-regulatory, scientific, investigative agency. It has an annual budget, after the sequester, of $10.6 million and approximately 42 employees. In addition to investigations, safety studies, and recommendations, we do extensive outreach to companies and other organizations to inform them of our findings. Companies throughout the U.S. and the world use the information and recommendations developed by the CSB to help create what we hope are safer workplaces.

Congress frequently calls upon the CSB to investigate the root causes of some of the most complex and tragic industrial accidents across the country. Currently the CSB is involved in investigations of the Deepwater Horizon blowout in the Gulf of Mexico, the 2010 Tesoro refinery fire in Washington State, the 2012 Chevron refinery fire in California, and many other cases. Over the past two months, the CSB has begun investigations of the devastating explosion at West Fertilizer in West, Texas, on April 17, and the June 13 explosion at Williams Olefins in Geismar, Louisiana.

I will summarize the status of these two investigations and our preliminary findings, and then present some general thoughts on how the oversight of chemical safety might be improved.

West Fertilizer

West Fertilizer was a small retail distribution center that served farmers in the surrounding community and had approximately 15 employees. The facility was built in 1961, and at the time of the incident had a handful of buildings, including a warehouse where fertilizers and other materials were stored. The current owner, who operated an adjacent seed business, purchased the facility from liquidation in 2004.

No manufacturing occurred at the site, only blending of fertilizers for retail customers. Fertilizers such as ammonium nitrate and anhydrous ammonia were delivered to the site by rail car or truck. The ammonium nitrate, a granular solid, was stored in the facility’s fertilizer warehouse building in wood-framed bins with wooden walls. Both the warehouse building and the bins were constructed of combustible wooden material, and the building also contained significant quantities of combustible materials such as seeds stored near the bins of ammonium nitrate. The building had no automatic sprinkler or fire suppression features.

2

The facility straddles the city limit in the northeast section of West, Texas. When it was first built, the area was rural and there were few other structures nearby. Over time, many residences, a nursing home, an apartment complex, a high school, and an intermediate school were constructed within a 2000-foot radius of West Fertilizer.

On the evening of April 17, a fire of undetermined origin broke out at the facility, which had already closed for the day and was unattended. At 7:30 p.m. the fire was observed and reported to 9-1-1 dispatchers, who deployed the community’s volunteer firefighting force with four pieces of equipment. Firefighters found the warehouse building in flames and were in the process of extending hoses to fight the fire, and were applying some water to the blaze. Although the firefighters were aware of the hazard from the tanks of anhydrous ammonia as a result of previous releases, they were not informed of the explosion hazard from the approximately 60 tons of fertilizer grade ammonium nitrate inside the warehouse.

At about 7:50 p.m., while firefighters were positioned nearby, the ammonium nitrate suddenly detonated. A shock wave, traveling faster than the speed of sound, crushed buildings, flattened walls, and shattered windows. Innumerable projectiles of steel, wood, and concrete – some weighing hundreds of pounds – were hurled into neighborhoods. Twelve firefighters and emergency responders were killed. At least two members of the public died as well. More than 200 were injured. If this incident had occurred earlier in the day, many more people might have been killed or injured.

Residents of the West Rest Haven nursing home were severely affected, and according to nursing home officials 14 patients have passed away since the April 17 explosion, dying at twice the expected rate. The nursing home itself was destroyed, as was the apartment complex across the street. Two large schools – the high school and the intermediate school – were structurally damaged beyond repair and will be torn down, and a third school was also badly damaged. Because of the hour of day, all the schools were unoccupied. Had the explosion taken place during the day, severe casualties could have occurred in the intermediate school, which was devastated by both blast and fire. Post-explosion damage assessments indicate that it would have been difficult for children and others to escape from the building. The CSB is currently evaluating the vulnerability of this structure, to understand the potential consequences if the explosion had occurred when children were present and to inform future siting decisions.

Nearly 200 homes were severely damaged or destroyed, a sizeable fraction of all the houses in West. Financial damage is still being assessed, but the cost to rebuild the schools alone will reportedly approach $100 million. Some reports suggest total damages to the town may exceed $230 million, an unimaginable blow to a town of just 2800 residents – more than $80,000 for each man, woman, and child living in West.

CSB Investigation

A large CSB investigation team was assembled in West the day after the incident, on April 18. To date the CSB has conducted detailed interviews of about 30 witnesses, and has issued approximately 13 document requests to West Fertilizer, contract firms, hospitals, and regulators.

3

The CSB has also engaged external experts in blast reconstruction, fire codes and fire protection, and explosion mechanisms.

West Fertilizer and other companies have cooperated fully with the investigation. The CSB has also received outstanding cooperation from the mayor of West and its police and fire departments, and from other local agencies. The investigation has faced significant challenges as well, since the accident site was treated as a criminal scene for approximately five weeks after April 17 and was extensively altered during that time period, including the removal of most surviving physical evidence.1

I visited West, Texas, on May 2, just a couple of weeks after the explosion. The damage to homes, schools, and businesses was almost beyond imagination – even by the standards of large- scale chemical disasters. My heart goes out to the people of West, as they work to rebuild their proud and historic community. But I can assure you that it will be years before even the physical scars of this terrible explosion begin to fade.

Ammonium nitrate (AN) is a crop nutrient that represents about 2% of the total applied nitrogen fertilizer in the U.S. It is used primarily on pasture and citrus; its use has been declining in recent years as security concerns have increased since the Oklahoma City bombing in 1995. Ammonium nitrate is a strong oxidizer that reacts energetically with organic materials; it is also reactive by itself and capable of a runaway decomposition reaction and detonation under certain conditions.

Ammonium nitrate has historically been involved in some of the most severe chemical accidents of the past century, including disastrous explosions in the United States, Germany, and France. Two of these accidents – in Oppau, Germany, in 1921 and in Texas City, Texas, in 1947 – each killed 500 or more people. Additional safeguards were adopted following the Texas City disaster, such as avoiding contamination with petroleum-based materials that sensitize AN. These changes are credited with reducing the risk of a mass explosion of AN, but the risk of detonation was not eliminated. In September 2001, for example, a large AN explosion occurred at a factory in Toulouse, France, killing 30, injuring thousands of others, and damaging up to 30,000 buildings. Other serious AN-related accidents have occurred in the U.S. and other countries over the years.

Heat, fire, shock, confinement, and contamination are all factors that can sensitize ammonium nitrate to detonation. To quote from a comprehensive 1985 review of the hazards of AN:

The main thrust of the safety precautions recommended in most literature is the minimization of the most likely hazard, namely, the risk of fire. Ammonium nitrate should not be stored where it can be affected by any source of heat or by combustible materials.2

1 Within the past three weeks, the ATF has begun producing records and evidence from its investigation to the CSB. The ATF released the remains of the West site from its control back to the company on May 24. 2 Shah, K.D.; Roberts, A.G.; “Safety Considerations in the Processing, Handling, and Storage of Ammonium Nitrate;” In Keleti, C. (ed.); Nitric Acid and Fertilizer Nitrates; New York: Marcel Dekker Inc., 1985.

4

As simple as this sounds, this principle has not been fully adopted across the U.S., and was not implemented at West Fertilizer.

The CSB has made the following observations and preliminary findings to date, which are subject to further revision and development as the investigation unfolds:

1) The explosion at West Fertilizer resulted from an intense fire in a wooden warehouse building that led to the detonation of approximately 30 tons of AN stored inside in wooden bins. Not only were the warehouse and bins combustible, but the building also contained significant amounts of combustible seeds, which likely contributed to the intensity of the fire. According to available seismic data, the explosion was a very powerful event. 2) Whether additional factors such as material characteristics, shock, or contamination contributed to the incident remains to be determined. Company employees described a PVC plastic pipe that was located directly above the AN bin that detonated, and likely would have been melted by the fire. Additionally, large amounts of potentially flammable anhydrous ammonia were stored along the southern edge of the warehouse building. 3) The building lacked a sprinkler system or other systems to automatically detect or suppress fire, especially when the building was unoccupied after hours. By the time firefighters were able to reach the site, the fire was intense and out of control. Just 20 minutes after the first notification to the West Volunteer Fire Department, the detonation occurred. 4) Both National Fire Protection Association (NFPA) and the International Code Council (ICC), private organizations that develop fire codes that are widely applied across the U.S., have written code provisions for the safety of ammonium nitrate. Many of these safety provisions are quite old3 5) The existing fire codes do contain some useful provisions; for example the codes do require a fire resistant barrier between AN and any stored flammable or combustible materials and have provisions to avoid AN confinement and promote ventilation during fire conditions. However, even the most current NFPA 400 standard allows AN to be stored in wooden buildings and in wooden bins, and does not mandate automatic sprinkler systems unless more than 2500 tons of AN is being stored – vastly more than the approximately 30 tons that was sufficient to devastate much of the town of West. In addition, the standard contains a “grandfathering” provision that allows existing buildings that were constructed prior to code adoption – and fail to meet all of its provisions – to continue in use. and appear to be confusing or contradictory, even to code experts, and are in need of a comprehensive review in light of the West disaster and other recent accidents. For example the ICC’s International Fire Code directs users to a defunct code for ammonium nitrate (NFPA 490, last issued in 2002) rather than the current code, known as NFPA 400.

3 NFPA 400 refers users to a 1953 publication by the U.S. Bureau of Mines for information on the explosive properties of AN.

5

6) Texas has not adopted a statewide fire code, and state law actually prohibits most smaller rural counties from adopting a fire code. McLennan County, where the West facility was located, had not adopted a fire code, although it technically had the authority to do so because of its proximity to the more populous Bell County. The West Fertilizer facility was thus not required to follow any NFPA or ICC recommendations for the storage of AN. 7) Although some U.S. distributors have constructed fire-resistant concrete structures for storing AN, fertilizer industry officials have reported to the CSB that wooden buildings are still the norm for the distribution of AN fertilizer across the U.S. 8) Industry has developed other forms of ammonium nitrate that are reported to reduce or eliminate the risk of accidental detonation. For example, compounding the ammonium nitrate with calcium carbonate (limestone) “practically eliminates any risk of explosion in its storage, transportation, and handling,” while preserving the AN’s nutritive value.4 Calcium ammonium nitrate fertilizers have been widely used in Europe. Ammonium sulfate nitrate also has been found to be non-explosive provided the percentage of AN is held below about 37%.5 9) The federal OSHA standard for “Explosives and Blasting Agents” (29 CFR 1910.109) does have requirements for ammonium nitrate fertilizer; its provisions are similar to the NFPA codes. Unlike the NFPA codes – which West was not legally required to follow under any fire code – the OSHA standard would have applied. Like NFPA, however, the OSHA standard does not prohibit wooden bins or wooden construction, and does not require sprinklers unless more than 2500 tons of AN is present. However, OSHA public records indicate that OSHA last inspected the facility in 1985, and no citations were issued under the “Explosives and Blasting Agents” standard.

10) OSHA’s Process Safety Management standard (29 CFR 1910.119) or PSM was adopted in 1992 and is designed to prevent catastrophic workplace incidents involving highly hazardous chemicals. PSM requires companies to have a variety of management elements to prevent catastrophic incidents, such as conducting hazard analyses and developing emergency plans. Ammonium nitrate is not, however, one of the listed chemicals that triggers PSM coverage. The PSM standard also contains an exemption for retail facilities. 11) The EPA’s Risk Management Program rule (40 CFR Part 68) or RMP was adopted in 1996 and is designed to prevent catastrophic offsite and environmental damage from extremely hazardous substances. As the name suggests, the rule requires covered facilities to develop a Risk Management Plan, implement various safety programs, and analyze offsite consequences from potential accidents. Once again, however, ammonium nitrate is not one of the listed chemicals that triggers RMP coverage. West Fertilizer was RMP-covered due to its stored ammonia, and the company’s offsite consequence analysis considered only the possibility of an ammonia leak, not an explosion of ammonium nitrate.

4 Calcium ammonium nitrate (CAN) must still be protected from contamination with other chemicals that can re- sensitize it to detonation. See Popovici Ipochim, N.N.; Icechim, M.M.; “Other Ammonium Nitrate Fertilizers;” In Keleti, C. (ed.); Nitric Acid and Fertilizer Nitrates; New York: Marcel Dekker Inc., 1985. 5 Ibid.

6

12) OSHA considered adding ammonium nitrate along with other highly reactive chemicals to its list of PSM-covered substances in the late 1990’s. However, this proposal was shelved in 2001. In developing the RMP regulation, the EPA did not explicitly include explosives or reactive chemicals in the list of covered chemicals. In 2002, the CSB issued a study on reactive hazards, identifying 167 prior reactive incidents (including a 1994 explosion at an ammonium nitrate manufacturer). The Board recommended that both OSHA and EPA expand their standards to include reactive chemicals and hazards. However, neither agency has yet acted upon the recommendations. 13) No federal, state, or local standards have been identified that restrict the siting of ammonium nitrate storage facilities in the vicinity of homes, schools, businesses, and health care facilities. In West, Texas, there were hundreds of such buildings within a mile radius, which were exposed to serious or life-threatening hazards when the explosion occurred on April 17. 14) West volunteer firefighters were not made aware of the explosion hazard from the AN stored at West Fertilizer, and were caught in harm’s way when the blast occurred. NFPA recommends that firefighters evacuate from AN fires of “massive and uncontrollable proportions.” Federal DOT guidance contained in the Emergency Response Guidebook, which is widely used by firefighters, suggests fighting even large ammonium nitrate fertilizer fires by “flood[ing] the area with water from a distance.” However, the response guidance appears to be vague since terms such as “massive,” “uncontrollable,” “large,” and “distance” are not clearly defined. All of these provisions should be reviewed and harmonized in light of the West disaster to ensure that firefighters are adequately protected and are not put into danger protecting property alone. 15) While U.S. standards for ammonium nitrate have apparently remained static for decades, other countries have more rigorous standards covering both storage and siting of nearby buildings. For example, the U.K.’s Health and Safety Executive states in guidance dating to 1996 that “ammonium nitrate should normally be stored in single storey, dedicated, well-ventilated buildings that are constructed from materials that will not burn, such as concrete, bricks or steel.”6 16) CF Industries, a principal manufacturer of AN that was one of the suppliers to West, also recommends more rigorous safeguards in its Material Safety Data Sheet (MSDS) for the chemical. In the section entitled “Handling and Storage,” CF recommends that “Storage construction should be of non-combustible materials and preferably equipped with an automatic sprinkler system.” The U.K. guidance calls for storage bays “constructed of a material that does not burn, preferably concrete.” 7 17) The Bureau of Alcohol, Tobacco, Firearms, and Explosives (ATF) has regulations for ammonium nitrate used as an explosive but these do not apply to ammonium nitrate used as fertilizer. The U.S. Department of Homeland Security has reporting Although companies are required to issue MSDS’s, the recipients of this information like West Fertilizer are not obligated to follow the recommended safety precautions. West lacked these safeguards.

6 U.K. Health and Safety Executive; “Storing and Handling Ammonium Nitrate;” Available from http://www.hse.gov.uk/pubns/indg230.pdf 7 http://www.cfindustries.com/pdf/Ammonium-Nitrate-Amtrate-MSDS.pdf

7

requirements for companies that have a threshold amount of fertilizer grade ammonium nitrate. However, the authority of DHS is to require security measures to protect against theft, diversion, or other intentional acts; DHS does not regulate the safety of ammonium nitrate to prevent conditions leading to accidental detonation. 18) The Emergency Planning and Community Right-to-Know Act of 1986 (EPCRA) contains an exemption from hazardous chemical reporting for “fertilizer held for sale by a retailer to the ultimate customer.” The EPA has interpreted this provision as not applying to firms, like West, that make custom blends of bulk fertilizer for customers’ use. In 2012, West Fertilizer filed an EPCRA Tier II report with the McLennan County Local Emergency Planning Committee (LEPC). West reported the presence of up to 270 tons of ammonium nitrate, as well as anhydrous ammonia, at the site. The company did not provide the LEPC or the West Fire Department with an ammonium nitrate MSDS indicating the material’s hazards, nor does EPCRA automatically require that information to be provided. There is no indication that West’s filing with local authorities resulted in an effort to plan for an ammonium nitrate emergency. It is important to bear in mind the limitations on Local Emergency Planning Committees that operate in communities around the country. While these committees are required to exist under EPCRA, they are largely staffed by either volunteers or local officials who likely have many collateral duties. The law did not establish any funding stream for the LEPC’s, and they do not have any regulatory authority over chemical facilities. Their fundamental role is in emergency preparedness and coordination. The primary responsibility for developing and enforcing safety standards belongs to other federal and state agencies.

To summarize, the safety of ammonium nitrate fertilizer storage falls under a patchwork of U.S. regulatory standards and guidance – a patchwork that has many large holes. Specifically, the CSB has not identified any U.S. standards or guidance that prohibit or discourage many of the factors that likely contributed to the West disaster. Combustible wooden buildings and storage bins are permitted for storing AN across the U.S. – exposing AN to the threat of fire. Sprinklers are generally not required unless very large quantities of AN are being stored or fire authorities order sprinklers to be installed. Federal, state, and local rules do not prohibit the siting of AN storage near homes and other vulnerable facilities such as schools and hospitals.

The CSB has had a number of discussions with fertilizer industry representatives since April 17, including officials from The Fertilizer Institute and the Agricultural Retailers Association. We believe the industry has a strong and sincere interest in learning from the tragedy in West and taking steps to prevent future incidents involving ammonium nitrate, including the development of new audit tools and product stewardship programs. I applaud these efforts and encourage these organizations to draw upon the best science as well as the strongest safety recommendations from the U.S. and overseas, to ensure that U.S. fertilizer firms are applying the highest safety standards available anywhere in the world.

These voluntary programs should complement a thorough effort by the federal government to review and improve the comprehensive safety oversight of ammonium nitrate fertilizer distribution. The time for that effort is now.

8

Williams Olefins Explosion

On June 13, an explosion and fire occurred at the Williams Olefins plant in Geismar, Louisiana. This plant produces ethylene and propylene, which are raw materials for common plastics, and employs over one hundred workers. At the time of the incident, hundreds of contract workers were also present at the site for a major expansion project.

The CSB deployed a team of seven to the site, and CSB investigators have had a continuous presence in Geismar since June 15. The team has interviewed at least 28 witnesses and has reviewed documents and other information obtained from the company. Williams Olefins and other companies at the site have provided excellent cooperation with the investigation.

The incident involved a large distillation tower that processes propylene, propane, and other highly flammable hydrocarbons. The equipment was in normal operation on June 13. At 8:36 a.m. there was a sudden catastrophic failure involving a heat exchanger and associated piping attached to the distillation tower. The steel shell of the heat exchanger ripped open, and piping detached where it connected to the tower. The exact sequence and cause of these events remains to be determined.

In any event, there was a large-scale release of propylene, propane, and other hydrocarbons from multiple release points, forming a vapor cloud more than 200 feet high that is visible in surveillance video from the site. Within four seconds the vapor cloud ignited. Two Williams employees were fatally burned and approximately 105 other Williams employees and contractors were injured. The resulting fire burned for over four hours.

All of us at the CSB offer our deepest condolences and prayers for the families of the victims and for the injured. We are committed to a thorough investigation to determine why this horrible accident occurred.

CSB investigators have surveyed the scene from ground level and from the air, but currently the immediate area of the ruptured equipment remains too hazardous for entry due to overhanging debris. During the course of this week the area will be made safe for human entry, and this will allow investigators to observe the positions of key valves and obtain other important information. In addition we plan to recover and perform metallurgical tests on the heat exchanger and other piping. This testing will help determine whether the equipment that failed had weakened or deteriorated prior to the rupture, or some other factors were at play.

We are also working with the company to recover electronic control system data that will reveal process conditions at the time of the incident, such as material flows, pressures, and temperatures as well as valve positions. These data will also be important to understanding what occurred.

The assessment of the site and equipment is occurring in close coordination with federal OSHA inspectors. Within a few days of the incident, the CSB, OSHA, and the company entered into a written site and evidence control agreement to ensure that the evidence at the site is properly preserved in as-found condition, and all parties participate in the identification and testing of evidence. So far it has been a good model for how all incident sites should be handled.

9

CSB Investigative Capacity

The recent tragedies in West and Geismar have further taxed the CSB’s already overstretched staffing and resources. When the Congress requested that the CSB conduct a root-cause investigation of the Deepwater Horizon blowout, we informed Congress that this vital work would have unavoidable adverse effects on many other cases the CSB had already begun. The CSB already faced a record backlog of cases in 2010, when I became the chair. Not only have these adverse effects occurred, but Transocean – the operator of the Deepwater Horizon – has engaged in a lengthy legal challenge to the CSB’s authority to investigate the incident. On April 1, 2013, a federal district court in Houston ruled completely in the CSB’s favor and confirmed our offshore jurisdiction, but Transocean has indicated its intention to appeal the decision and seek a stay of enforcement. This unfortunate legal situation has continued to delay the CSB’s access to many documents and witnesses relevant to the investigation of the blowout.

The West and Geismar investigations have very significant financial costs associated with them and West in particular has required the diversion of a very large percentage of CSB’s investigators, who already had many months of work in the pipeline ahead of them when the tragedy struck. I would like to engage in a discussion with the Committee over the coming weeks about the impact of these new investigations on the CSB’s capacity to finish existing investigations – many of which have important stakeholders who have already been waiting a long time for answers. I also wish to notify the Committee that I believe the CSB has no capacity at this point to undertake any new investigative work, beyond what has already been promised and begun.

Possible Approaches for Reducing Risk

Since the CSB was established in 1998, the Board has made a number of safety recommendations for improving the oversight of facilities that handle hazardous substances. The CSB has made a number of recommendations to the Environmental Protection Agency, including the above-mentioned recommendation to broaden the application of the Risk Management Program to encompass reactive hazards that could have an impact on communities. The CSB has also recently recommended that the EPA strengthen the safety provisions for disposing of hazardous waste; this followed a recent tragedy in Hawaii where five federal subcontractors were killed disposing of illegal fireworks seized by the government.

In another recent case, the CSB urged the EPA to make greater use of its general duty clause authorities under the Clean Air Act by warning operators of their responsibility to safeguard remote oil and gas production sites; the CSB investigation found that 44 members of the public – children and young adults – died in explosions at these unsecured hazardous sites.

The Board has made a number of safety recommendations to OSHA as well. Among the improvements we have sought are a new regulatory standard for combustible dust; broadening the PSM standard to cover reactive chemicals and atmospheric storage tanks and to require more effective management of change reviews; modernization of standards for acetylene and compressed gases; and developing a new safety standard for fuel gases.

10

The majority of the CSB’s recommendations have not been directed to federal regulators but rather to other organizations around the country, including state and local governments, labor unions, trade associations, and the bodies like the ICC and NFPA that are responsible for developing consensus standards. The overall acceptance rate for CSB recommendations now exceeds 70%, and we track all recommendations to completion.

Improved enforcement efforts are just as important as having effective standards. In the CSB’s 2007 report on the explosion at BP’s Texas City refinery, the Board called for OSHA to expand its enforcement of process safety requirements by “hiring or developing a sufficient cadre of highly trained and experienced inspectors.” The Board report observed that there were few comprehensive OSHA inspections of refineries and other chemical sites, and OSHA had only a handful of inspectors with industrial process experience. By comparison, other countries like the U.K. had developed large bodies of specialized inspectors to perform ongoing, detailed safety inspections of hazardous facilities. OSHA responded in part to the recommendation by creating a new National Emphasis Program for refineries; the program was considered very effective by OSHA leaders, uncovering many safety problems in refineries. Unfortunately, OSHA did not have adequate resources to continue the program for more than a temporary period.

The EPA has also lacked the dedicated resources to conduct extensive enforcement of RMP program requirements. When this Committee conducted oversight of the program in 2007, the EPA told the late Senator Lautenberg that the total RMP-related fines collected for the entire country over nearly a four-year period (from fiscal year 2004-2007) were just over $3.5 million,8

a modest sum for a program that covers over 12,000 facilities. The CSB believes there are a number of serious challenges for improving industrial process safety in the U.S. As noted above, both OSHA and EPA process safety standards rely heavily upon list-based approaches for determining which facilities and companies have to comply with the most rigorous requirements. This concept of a hazardous chemical list was largely borrowed from environmental statutes of the 1970’s and 1980’s. However, process safety experts generally recognize that process hazards are a function of chemistry itself, and it makes little sense to assert that the overall risks from chemical processing and handling can be adequately captured using small lists of chemicals. Time and again the CSB has found large chemical hazards – capable of causing major disasters – residing in facilities that have largely escaped regulatory scrutiny. These facilities – of which West Fertilizer is but one example – fall outside the scope of existing regulatory standards, which were developed in the 1990’s and have seen few updates since then. All too often, a tragedy like the one at West suddenly exposes the hazards of a chemical or process that had somehow been overlooked.

The effects of these regulatory and enforcement challenges are evident in the accident rates for U.S. refineries and petrochemical sites. In 2008, a leading reinsurance company, Swiss Re, told the CSB and federal regulatory agencies that property losses from U.S. refinery accidents were occurring at approximately four times the rate of the rest of the world. In a follow-up briefing, Swiss Re officials asserted the gap between refinery safety performance in the U.S. and in the

8 Christopher P. Bliley, Associate Administrator, EPA; Letter to Senator Barbara Boxer, Chairman, Committee on Environment and Public Works, August 22, 2007.

11

rest of the world was continuing to widen. Many developed nations have adopted a different approach for controlling major process hazards. For example, nations in Europe and elsewhere have implemented a “safety case” regime, that requires hazardous facilities to continuously meet higher standards and reduce risk. Companies work directly with the regulator to identify the most appropriate safety standards from around the world, which they then are required to follow as a condition of operating. The focus is on preventing accidents in highly complex, technological systems rather than post-accident punishment.

Implementing an effective regulatory regime such as the safety case, with the ability to manage and regulate high hazard industries and prevent serious accidents, requires a number of inter- dependent features. First, the regulatory regime must be truly goal-setting in nature; another term for this is a performance-based regulatory regime. This approach provides industry the opportunity to tailor the regulations to its specific facilities with the goal of continuous risk reduction and incident prevention. The safety case regime also imposes a general duty on industry to reduce all risks in its operations to as low as reasonably practicable (ALARP). Such an approach places the impetus on industry to evolve with current best safety practices, wherever they have been developed anywhere in the world, to ensure that process hazards have been adequately identified, evaluated, and controlled. Furthermore, this regime requires industry to utilize leading and lagging indicators to drive risks involved in major hazard facilities to as low as reasonably practicable. Finally, for effective implementation, this type of regime requires an independent, competent, and well-funded regulator. Experience and competence in technical areas such as chemical engineering, human factors, and process safety management are necessary to provide effective auditing and regulatory oversight for prevention. In a recent federal OSHA forum on reforming process safety regulations, noted safety expert Andrew Hopkins pointed out that all of these elements are essential for an effective major accident prevention regime. Dr. Hopkins emphasized that the whole package of the safety case system needs to be introduced to make it work, including a competent, well-funded regulator.9

The CSB has begun to examine these alternative regulatory systems in the context of investigating the recent Chevron refinery fire in California and the Deepwater Horizon blowout in the Gulf. This April, the CSB issued its interim report on the Chevron refinery fire, which sent over 15,000 Richmond residents to the hospital in August 2012. California legislators have responded proactively to the accident and to the CSB’s recent findings and recommendations. A bill now before the California governor for signature would effectively triple the number of dedicated process safety inspectors in the state. This expansion will be funded by fees collected from the industry, and will not significantly burden taxpayers. And state legislators as well as leaders from Contra Costa County, where the refinery is located, have been working to implement other CSB recommendations for safer equipment designs and materials, reporting of process safety indicators, and improved maintenance procedures. California’s actions should be closely examined, we believe, as a potential model for other states and the federal government to follow.

Thank you again, Chairman Boxer and Ranking Member Vitter, for the opportunity to testify today.

9 OSHA Expert Forum on the Use of Performance-Based Regulatory Models in the U.S. Oil and Gas Industry, Offshore and Onshore; Texas City, Texas; September 20, 2012.

12

13

FD06461 | 2013_美国_Williams_Olefins_工厂_爆炸_与火灾-_Williams_Olefins_Plant_Explosion_and_Fire__最终报告.pdf

分类:06_境外及港澳台调查报告 | 年份:2013 | 地域: | 严重程度: | 场所:厂房/车间 | 起火原因:燃气/爆炸 | 来源格式:pdf

CSB · Williams Geismar Case Study 1

Published October 2016

Williams Geismar Olefins Plant Reboiler Rupture and Fire Geismar, Louisiana

Incident Date: June 13, 2013 Two Fatalities, 167 Reported Injuries No. 2013-03-I-LA

KEY ISSUES:

• Overpressure Protection • Process Hazard Analysis • Management of Change • Pre-Startup Safety Review • Operating Procedures • Hierarchy of Controls • Process Safety Culture

2 CSB · Williams Geismar Case Study

The U.S. Chemical Safety and Hazard Investigation Board (CSB) is an independent Federal agency whose mission is to drive chemical safety change through independent investigations to protect people and the environment. The CSB is a scientific investigative organization; it is not an enforcement or regulatory body. Established by the Clean Air Act Amendments of 1990, the CSB is responsible for determining the root and contributing causes of accidents, issuing safety recommendations, studying chemical safety issues, and evaluating the effectiveness of other government agencies involved in chemical safety. More information about the CSB is available at www.csb.gov. The CSB makes public its actions and decisions through investigative publications, all of which may include safety recommendations when appropriate. Examples of the types of publications include: CSB Investigation Reports: formal, detailed reports on significant chemical accidents and include key findings, root causes, and safety recommendations. CSB Investigation Digests: plain-language summaries of Investigation Reports. CSB Case Studies: shorter than a full investigative report, case studies present investigative information from specific accidents and include a discussion of relevant prevention practices. CSB Safety Bulletins: short, general-interest publications that provide new or timely information intended to facilitate the prevention of chemical accidents. CSB Hazard Investigations: broader studies of significant chemical hazards. Safety Videos: high-quality outreach products that result in improved worker and environmental protection. CSB publications can be downloaded at www.csb.gov or obtained by contacting: U.S. Chemical Safety and Hazard Investigation Board Office of Congressional, Public, and Board Affairs 1750 Pennsylvania Ave NW, Suite 910 Washington, DC 20006 (202) 261-7600 No part of the conclusions, findings, or recommendations of the CSB relating to any chemical accident may be admitted as evidence or used in any action or suit for damages. See 42 U.S.C. § 7412(r)(6)(G).

CSB · Williams Geismar Case Study 3

DEDICATION This CSB Case Study is dedicated to the two men, listed below, who lost their lives as a result of this incident, as well as to the numerous workers injured on June 13, 2013.

Zach Green, 29

Scott Thrower, 47

4 CSB · Williams Geismar Case Study

This page is intentionally blank.

CSB · Williams Geismar Case Study 5

  1. 0 INTRODUCTION

This case study examines the June 13, 2013 catastrophic equipment rupture, explosion, and fire at the Williams Olefins Plant in Geismar, Louisiana, which killed two Williams employees. The incident occurred during nonroutine operational activities that introduced heat to a type of heat exchanger called a “reboiler” which was offline, creating an overpressure event while the vessel was isolated from its pressure relief device. The introduced heat increased the temperature of the liquid propane mixture1 confined within the reboiler shell, resulting in a dramatic pressure rise within the vessel due to liquid thermal expansion. The reboiler shell catastrophically ruptured, causing a boiling liquid expanding vapor explosion (BLEVE)2 and fire. Process safety management program weaknesses at the Williams Geismar facility during the 12 years leading to the incident caused the reboiler to be unprotected from overpressure. These weaknesses include deficiencies in implementing Management of Change (MOC), Pre-Startup Safety Review (PSSR), and Process Hazard Analysis (PHA) programs. In addition, the company did not perform a hazard analysis or develop a procedure for the operational activities conducted on the day of the incident. This incident illustrates the importance of: • Using the hierarchy of controls when evaluating and selecting safeguards to control process hazards; • Establishing a strong organizational process safety culture; • Developing robust process safety management programs; and • Ensuring continual vigilance in implementing process safety management programs to prevent major process safety incidents. Following the incident, Williams implemented improvements in managing process safety. To prevent future incidents and further improve process safety at the Geismar plant, the U.S. Chemical Safety and Hazard Investigation Board (CSB) recommends that Williams strengthen existing safety management systems and adopt additional safety programs. The CSB also issues recommendations to the American Petroleum Institute (API) to help prevent future similar incidents industry-wide.

1 The process fluid in the reboiler contained an estimated 95% propane, with the balance composed mostly of propylene and C4 hydrocarbons, such as butane. 2 See section 4.0 for a technical explanation of the BLEVE mechanism, and a detailed sequence of events leading to the explosion. TABLE OF CONTENTS 1.0 Introduction 2.0 Background 3.0 The Incident 4.0 Technical Analysis 5.0 Analysis of Williams Geismar Process Safety Management Programs 6.0 Hierarchy of Controls 7.0 Industry Codes and Standards 8.0 Williams Geismar Post-incident Changes 9.0 Strategies for Improving Safety Culture 10.0 Key Lessons 11.0 Conclusions 12.0 Recommendations Appendix A – Causal Analysis AcciMap Appendix B – Failure Scenario Analysis Appendix C – Metallurgical Analysis Report “We would never knowingly tolerate a situation in which accidental operation of a valve resulted in the overpressuring of a vessel. We would install a relief valve. In the same way, accidental operation of a valve should not be allowed to result in explosion […].” Trevor Kletz, What Went Wrong? – Case Histories of Process Plant Disasters and How They Could Have Been Avoided, 5th ed., 2009

6 CSB · Williams Geismar Case Study

  1. 0 BACKGROUND
  2. 1

WILLIAMS BACKGROUND The Williams Companies, Inc. (“Williams”) is an energy infrastructure company headquartered in Tulsa, Oklahoma. Founded in 1908, Williams owns interests in natural gas and natural gas liquid (NGL) pipeline and processing facilities throughout North America, and conducts most of its operations through subsidiary companies. One of its subsidiary companies is Williams Olefins LLC, which owns and operates the Williams Geismar Olefins Plant. 2.2 GEISMAR OLEFINS PLANT The Williams Geismar Olefins Plant, which employs approximately 110 people, is located in Geismar, Louisiana, approximately 20 miles southeast of Baton Rouge. The Lummus Company designed and built the olefins plant in 1967, and Allied Chemical first operated it. In 1985, Union Texas Petroleum purchased the plant from Allied Chemical and sold it to Atlantic Richfield Company (ARCO) in 1998. Williams then purchased the facility in

  1. At the time of the incident, Williams Olefins LLC and Saudi Basic Industries Corporation (SABIC) jointly

owned the plant, and Williams Olefins was the sole operator. The Williams Geismar Olefins Plant produces ethylene and propylene for the petrochemical industry.3 The plant originally produced 600 million pounds of ethylene annually. Over the years, the production capacity increased to 1.35 billion pounds of ethylene and 80 million pounds of propylene per year. At the time of the incident, approximately 800 contractors worked at the Williams Geismar facility on an expansion project, with an end goal of increasing the production of ethylene to 1.95 billion pounds per year. 2.3 PROCESS OVERVIEW The June 13, 2013 incident occurred when a reboiler, a heat exchanger that supplies heat to a distillation column,4 catastrophically ruptured. The reboiler that failed, EA-425B (“Reboiler B”) was one of two reboilers (Reboiler A and Reboiler B) that supplied heat to the propylene fractionator—a distillation column that separates propylene and propane. The process fluid on the shell-side5 of these reboilers is heated by hot “quench water,” 6 flowing through the tubes. Reboiler B had been offline for 16 months while Reboiler A was in operation, but was clean and available for use when Reboiler A eventually fouled (see Section 2.4).7 Figure 1 is a simplified flow diagram highlighting the location of the propylene fractionator relative to the overall olefins production process.

3 Williams corporate website. https://co.williams.com/operations/ngl-petchem/olefins/ (accessed August 17, 2016). Olefins, also known as “alkenes,” are hydrocarbons that contain a carbon-carbon double bond. The primary olefins produced by the Williams Geismar facility are ethylene (H2C=CH2), and propylene (CH3CH=CH2). Ethylene is a basic chemical used in the production process of a variety of products including plastics, soaps, and antifreeze. A primary use of propylene is the manufacturing of plastic materials and antifreeze. 4 A distillation column is a type of process equipment that separates a feed mixture based upon the mixture components’ boiling point temperatures. Components with lower boiling point temperatures, the more volatile components, leave the upper portion of a distillation column, while components with higher boiling point temperatures, the less volatile components, leave the lower portion of a distillation column. 5 The propylene fractionator reboilers are shell and tube heat exchangers. This type of heat exchanger has a large cylindrical exterior or “shell,” with a bundle of tubes inside of the shell. 6 “Quench water” is water that is used to cool furnace effluent gases through direct contact with the gases. It is a “process water” stream because it directly contacts and often contains residual material from the furnace effluent gases. 7 Fouling historically occurred on the process water (quench water) side of the reboilers. Fouling is a term used to describe a buildup on equipment surfaces of undesired material that has an adverse impact such as reducing heat transfer efficiency.

CSB · Williams Geismar Case Study 7

  1. 3.1 OLEFINS PRODUCTION PROCESS DESCRIPTION

At the beginning of the olefins production process, ethane and propane enter “cracking furnaces”8 where they are converted to ethylene and propylene, as well as several byproducts including butadiene, aromatic compounds,9 methane, and hydrogen (Figure 1). The furnace effluent gases leave the cracking furnaces and enter heat exchangers that reduce the temperature of the gases. The furnace effluent gases then enter the quench tower for further cooling by direct contact with quench water, which is sprayed downward from the top of the tower. After additional processing, the cooled gases go to a series of distillation columns, such as the propylene fractionator, which separate the reaction products into individual components. The ethylene, propylene, butadiene, and aromatic compound products are then transported and sold to customers. Unreacted ethane and propane are recycled back to the beginning of the process. The quench water that directly contacts the heated furnace effluent gases is part of a closed-loop water circulation system. As the heated furnace effluent gases are cooled in the quench tower, heat transfers to the quench water. The heated quench water then serves as a heat source in various heat exchangers within the process, heating process streams while also reducing the temperature of the quench water. Finally, a cooling water system further cools the quench water before it circulates back to the quench tower (Figure 2).

8 “Cracking” is the breaking apart of molecules to form different molecules. 9 Examples of aromatic compounds, also called arenes, include benzene and toluene. FIGURE 1 Simplified flow diagram of the olefins process. The incident occurred when a propylene fractionator reboiler that had been offline for 16 months catastrophically ruptured. The propylene fractionator is highlighted in yellow.

8 CSB · Williams Geismar Case Study

Because the quench water directly contacts process gases, oily tar products10 contained in the gas condense into the quench water. The quench water settler removes most of the tar material (Figure 2); however, some oily material remains in the quench water. Over time, some of this material adheres to and builds up on the inside of process equipment such as heat exchanger tubes, resulting in a decrease in both heat transfer efficiency and quench water flow rate. The buildup of such material is called “fouling.” When quench water flow through the process periodically decreased due to fouling, Williams operations personnel would evaluate the quench water system by analyzing, among other things, flow rates through pumps and heat exchangers to identify the fouled piece of equipment likely causing the decrease in quench water flow. Williams personnel were performing this type of nonroutine operational activity when the incident occurred on June 13, 2013.

10 The tar products form in the cracking furnaces. FIGURE 2 Quench water system. The propylene fractionator Reboilers A and B are highlighted in yellow. The reboiler that ruptured, Reboiler B, is indicated with the red outline.

CSB · Williams Geismar Case Study 9

  1. 4

PROPYLENE FRACTIONATOR REBOILERS The propylene fractionator Reboilers A and B are shell and tube heat exchangers,11 where tube-side hot quench water vaporizes shell-side hydrocarbon process fluid, which is approximately 95% propane with the balance composed mostly of propylene and C4s12 (Figure 313 and Figure 4). (This report refers to the propane mixture as “propane.”) Quench water enters the propylene fractionator reboilers at approximately 185 °F and partially vaporizes the shell-side propane, which enters the reboiler at a temperature of approximately 130 °F. The original propylene fractionator design had both reboilers continuously operating. This process design required periodic propylene fractionator downtime when the reboilers fouled and required cleaning. In 2001, Williams installed valves on the shell-side and tube-side reboiler piping to allow for continuous operation with only one reboiler operating at a time. The other reboiler would be offline but ready for operation (see Section 5.1), isolated from the process by the new valves. This configuration allowed for cleaning of a fouled reboiler while the propylene fractionator continued to operate. Unforeseen at the time due to flaws in the Williams process safety management program (discussed in subsequent sections in this report), these valves also introduced a new process hazard. If the new valves were not in the proper position (open or closed) for each phase of operation, the reboiler could be isolated from its protective pressure relief valve located on top of the propylene fractionator (Figure 4).

11 The heat exchangers are 24 feet 8 inches long end-to-end. Each exchanger shell (the portion of the heat exchanger that holds the tube bundle) is approximately 18.5 feet long and over 5 feet in diameter. The tubes are each ¾-inch in diameter, and each heat exchanger contains 3,020 tubes. To put this in perspective, if one were to lay each tube from one heat exchanger end-to-end in a straight line, the tubes would span over 10.5 miles. 12 C4s are hydrocarbon molecules that contain four carbon atoms. For example, butane (C4H10) is a C4 molecule. 13 Depicted in Figure 3 as a two-pass heat exchanger for purposes of simplicity, the reboilers were six-pass heat exchangers. FIGURE 3 Propylene fractionator reboiler.

10 CSB · Williams Geismar Case Study

FIGURE 4 Propylene fractionator schematic. This schematic represents the equipment configuration at the time of the incident. The valves (gate valves) isolating the reboilers from the pressure relief valve at the top of the propylene fractionator were not part of the original design, and were installed in 2001. Section 5.1 provides additional information about these valves.

CSB · Williams Geismar Case Study 11

  1. 0 THE INCIDENT

On June 13, 2013, during a daily morning meeting with operations and maintenance personnel, the plant manager noted that the quench water flow through the operating propylene fractionator reboiler (Reboiler A) had dropped gradually over the past day (Figure 5). The group then analyzed plant data and noticed the entire quench water circulation rate seemed to be impaired. An operations supervisor, who Williams often relied on to troubleshoot and mitigate operational problems, informed the group that he would try to determine what caused the drop in flow. After evaluating the quench water system in the field, the operations supervisor informed several other personnel that fouling within the operating reboiler (Reboiler A) could be the problem and they might need to switch the propylene fractionator reboilers to correct the quench water flow. The operations supervisor attempted to meet with the operations manager to discuss switching the reboilers—a typical chain of communication—so that they could begin getting the necessary maintenance and operations personnel involved who needed to perform the work. The operations manager was not available, however, and the operations supervisor decided to return to the field and continue evaluating the quench water system.

The CSB determined that at 8:33 am, the operations supervisor likely opened the quench water valves on the offline reboiler, Reboiler B, as indicated by the rapid increase in quench water flow rate shown in Figure 6. Approximately three minutes later, Reboiler B exploded (Figure 7). Propane and propylene process fluid erupted from the ruptured reboiler and from the propylene fractionator due to failed piping. The process vapor ignited, creating a massive fireball. The force of the explosion launched a portion of the propylene fractionator reboiler piping into a pipe rack approximately 30 feet overhead (Figure 8). FIGURE 5 Graph of quench water flow rate through propylene fractionator Reboiler A prior to incident. Williams personnel identified that quench water flow rate had dropped.

12 CSB · Williams Geismar Case Study

FIGURE 7

Post-incident photo of the ruptured Reboiler B. A Williams operator working near the propylene fractionator at the time of the explosion died at the scene. The operations supervisor succumbed to severe burn injuries the next day. The explosion and fire also injured Williams employees and contractors who were working on a Williams facility expansion project—167 personnel reported injuries.14 The fire lasted approximately 3.5 hours, and Williams reported releasing over 30,000 pounds of flammable hydrocarbons during the incident.15 The plant remained down for 18 months and restarted in January 2015.

14 Of the 167 workers who reported injuries, three were Williams employees and 164 were contractors. 15 Louisiana Department of Environmental Quality Incident Report. See http://edms.deq.louisiana.gov/app/doc/view.aspx?doc=8925500&ob=yes&child=yes at p 2 (accessed August 28, 2016). FIGURE 6 Graph of quench water flow rate immediately prior to incident. Quench water flow rate rises when Reboiler B tube- side quench water valves are opened. Reboiler B ruptures approximately three minutes later.

CSB · Williams Geismar Case Study 13

FIGURE 8 Post-incident photo of the propylene fractionator reboilers and surrounding area. The Reboiler B vapor return piping can be seen overhead in the pipe rack (red circle). The approximate original configuration of the piping and equipment is shown in Figure 9 and Figure 14.

14 CSB · Williams Geismar Case Study

  1. 0 TECHNICAL ANALYSIS

The CSB commissioned metallurgical testing of the ruptured Reboiler B by agreement among Williams, OSHA, and the CSB.16 The metallurgical testing found that the propylene fractionator Reboiler B failed, resulting in the formation of a crack, at a high internal pressure estimated to be between 674 and 1,212 pounds per square inch gauge (psig). The CSB concluded that a pressure of this magnitude was likely the result of liquid thermal expansion in the liquid propane-filled and blocked-in Reboiler B shell, which overpressured the heat exchanger while it was isolated from its pressure relief device.17 The initial crack formation quickly progressed to catastrophic vessel failure, which resulted in a boiling liquid expanding vapor explosion (BLEVE) (see Section 4.2 for a technical description of the BLEVE mechanism). 4.1 FAILURE OF REBOILER B As explained above, following the 2001 valve installation, Williams Geismar operated one propylene fractionator reboiler at a time, keeping the other reboiler offline—in a configuration Williams called “standby.” After the operating reboiler fouled, Williams operations staff would put the standby reboiler online. They would then shut down, drain, blind,18 and clean the fouled reboiler. Next, they would remove the blinds and pressurize the reboiler with nitrogen,19 leaving the inlet and outlet block valves isolating the standby, nitrogen-filled reboiler shell from the propylene fractionator process fluid. The reboiler remained on standby, typically for a couple of years, until the second, now operating reboiler fouled. 4.1.1 STANDBY REBOILER B CONTAINED LIQUID PROPANE Williams performed maintenance on Reboiler B in February 2012. Following this maintenance activity, workers left Reboiler B on standby, reportedly filled with nitrogen and isolated from the process by a single closed block valve on the inlet piping and a single closed block valve on the outlet piping. The CSB determined that between the 2012 maintenance activity and the day of the incident—a period of 16 months—flammable liquid propane accumulated on the shell side of the standby Reboiler B (Figure 9).20 The propane could have entered the standby reboiler via a mistakenly opened valve, leaking block valve(s), or another unknown mechanism.21 (Depending on the scenario that allowed propane to enter the reboiler, the nitrogen could have compressed and/or been pushed from the reboiler into the process.) Williams had not installed instrumentation to detect process fluid within the reboiler. As a result, Williams personnel did not know that the standby Reboiler B contained liquid propane.22

16 The metallurgical report is located in Appendix C. 17 See Appendix B. 18 A blind is a metal plate inserted between flanges to ensure positive isolation of a vessel from the process. 19 Nitrogen is often used to fill a standby vessel because it is an inert gas. It is used to reduce the oxygen concentration in equipment in order to eliminate the possibility of a flammable mixture within the vessel or process. 20 Discussed in Appendix B, the reboiler was at least 65.5 vol% full of liquid propane. 21 Large gate valves such as the ones installed on the Williams reboilers are known to leak. The American Petroleum Institute (API) specifies allowable leakage rates through closed valves. For 16-inch and 18-inch valves such as the inlet valve and outlet valve on the propylene fractionator reboilers, API specifies an allowable leakage rate of 64 and 72 bubbles of gas per minute, respectively, during leak testing of the valves. (See API Standard 598, 9th ed. Valve Inspection and Testing, September 2009, p 10.) The reboiler block valves were leak tested following the incident. Their leakage rate was within that allowed by API Standard 598. While valve leakage likely allowed some process fluid to enter Reboiler B while it was on standby, a different mechanism could have introduced the bulk of the process fluid to the standby reboiler. 22 Records indicate that Williams filled the Reboiler B shell with nitrogen, to a pressure of approximately 50 psig, during a 2012 maintenance activity. Reboiler B did not have a pressure gauge installed on its shell to allow for periodic monitoring. A pressure gauge could have alerted the operations supervisor that the Reboiler B shell was at a pressure of at least 124 psig (the equilibrium vapor pressure of the process fluid at ambient temperature). This could have served as an indication that process fluid had entered the Reboiler B shell.

CSB · Williams Geismar Case Study 15

  1. 1.2 FAILURE OF REBOILER B DUE TO LIQUID THERMAL EXPANSION

Post-incident field observations identified that the Reboiler B tube-side hot quench water valves were in the open position (Figure 10). The shell-side process valves were closed, which isolated the shell of Reboiler B from its protective pressure relief valve on the top of the propylene fractionator (Figure 4). This valve alignment shows that heat was introduced into a closed system (i.e., the blocked-in Reboiler B shell).

When the Reboiler B hot quench water valves were opened, the liquid propane within the standby Reboiler B shell began to heat up. This caused the liquid propane to increase in volume due to liquid thermal expansion,23 filling any remaining occupiable vapor space within the shell. When the liquid could no longer expand due to confinement within the blocked-in Reboiler B shell, the pressure rapidly increased24 until the internal pressure exceeded the shell’s mechanical pressure limit (Figure 11), and the reboiler shell failed.25

23 Thermal expansion is the increase in volume of a given mass of a solid, liquid, or gas as it is heated to a higher temperature. 24 The liquid propane expanded and pressurized the reboiler faster than the vessel contents could escape through the leaking block valves. 25 The 2008 Goodyear Tire and Rubber Company explosion, investigated by the CSB, also occurred when heat was introduced to a heat exchanger that did not have an open path to its pressure relief device. That incident killed one person and injured six others. See the CSB’s final investigation report on the incident: Chemical Safety Board Website. Heat exchanger rupture and ammonia release in Houston, Texas. http://www.csb.gov/goodyear-heat-exchanger-rupture/ (Accessed August 17, 2016). FIGURE 9 Propane process fluid mixture entered standby Reboiler B by a mistakenly opened valve, valve leakage, and/or another mechanism. ***Note: Tube side piping not illustrated KEY LESSON

Closed gate (block) valves leak, and they are susceptible to inadvertent opening. Both scenarios can introduce process fluids to offline equipment. More robust isolation methods, such as inserting a blind, can better protect offline equipment from accumulation of process fluid.

16 CSB · Williams Geismar Case Study

FIGURE 10 Post-incident, the Reboiler B quench water inlet ball valve was found partially open (left), and the Reboiler B quench water outlet ball valve was found fully open (right). When the position indicator is parallel to the pipe, the valve is open; when the position indicator is perpendicular to the pipe, the valve is closed. “Equipment or pipelines which are full of liquid under no-flow conditions are subject to hydraulic expansion due to increase in temperature and, therefore, require overpressure protection. Sources of heat that cause this thermal expansion are solar radiation, heat tracing, heating coils, heat transfer from the atmosphere or other equipment. Another cause of overpressure is a heat exchanger blocked-in on the cold side while the flow continues on the hot side.” Center for Chemical Process Safety (CCPS), Guidelines for Engineering Design for Process Safety, 2nd ed., 2012 FIGURE 11 Expanding shell-side liquid propane could not sufficiently increase in volume due to the lack of overpressure protection and the closed shell-side process valves. As a result, shell-side pressure increased until reboiler shell failed.

CSB · Williams Geismar Case Study 17

  1. 2 BOILING LIQUID EXPANDING VAPOR

EXPLOSION (BLEVE) The high pressure generated from liquid thermal expansion of the propane cracked the reboiler shell. The shell contents began to vaporize near the crack opening, and a jet release of liquid and vapor accelerated out of the crack. The pressure loading on the open edges of the crack caused the crack to continue to grow along the vessel length. As the crack opening increased in size, the liquid and vapor jet release also rapidly grew. The continued internal pressure caused the reboiler shell to fail suddenly and catastrophically, splitting wide open (Figure 7 and Figure 12). With the shell confinement suddenly gone, the bulk of the shell contents abruptly lowered to atmospheric pressure. At atmospheric pressure, the liquid propane was above its boiling point (i.e. in a superheated state). (The atmospheric boiling point of the propane mixture was approximately -43 °F,26 and the liquid propane mixture was at a much higher temperature.) The propane explosively released into the surrounding area: propane vapor violently expanded and the superheated liquid rapidly vaporized. This type of explosion is known as a BLEVE.27 The propane then found an ignition source and ignited, creating a massive fireball. The blast effects flattened the reboiler shell (Figure 12).

26 Found using Aspen HYSYS simulation of Williams’ design composition of the propylene fractionator bottoms. 27 Center for Chemical Process Safety (CCPS). Guidelines for Vapor Cloud Explosion, Pressure Vessel Burst, BLEVE and Flash Fire Hazards, 2nd ed.; John Wiley & Sons, Inc.: Hoboken, New Jersey, 2010; p 311. BLEVE, pronounced ‘blev-ē, stands for “Boiling Liquid Expanding Vapor Explosion.” A BLEVE is the explosive release of expanding vapor and boiling liquid when a container holding a pressure liquefied gas—where the liquefied gas is above its normal atmospheric pressure boiling point temperature at the moment of vessel failure— suddenly fails catastrophically.i This explosive release creates an overpressure wave that can propel vessel fragments, damage nearby equipment and buildings, and injure people. If the pressurized liquid is flammable, a fireball or vapor cloud explosion often occurs. BLEVEs often result in the failed vessel flattened on the ground.

Fireball from propane BLEVE experiment.ii

Vessel flattened on ground following BLEVE.iii i. Birk, A.M.; Davison, C.; Cunningham, M.; Blast Overpressures from Medium Scale BLEVE Tests. Journal of Loss Prevention in the Process Industries, 2007, vol. 20, pp 194-206. ii.http://me.queensu.ca/People/Birk/Research/ThermalHazards/bl eve/FieldTrials2000-2002.html (accessed August 17, 2016). iii. Birk, A.M.; VanderSteen, J.D.J.; Davison, C.; Cunningham, M.H.; Mirzazadeh, I.; PRV Field Trials – The Effects of Fire Conditions and PRV Blowdown on Propane Tank Survivability in a Fire, TP 14045E, Transport Canada, 2003. What is a BLEVE?

18 CSB · Williams Geismar Case Study

FIGURE 12 Post-incident photo of Reboiler B shell. The pressure forces during the event flattened the cylindrical steel reboiler shell.

CSB · Williams Geismar Case Study 19

  1. 0 ANALYSIS OF WILLIAMS GEISMAR

PROCESS SAFETY MANAGEMENT PROGRAMS As will be explained in this section, the ineffective implementation of the Williams Geismar process safety management programs28 (Figure 13 shows a timeline of the program deficiencies during the 12 years leading to the incident), as well as weaknesses in Williams’ written programs themselves, were causal to the incident. Weaknesses in these programs resulted from a culture at the facility that did not foster and support strong process safety performance. Discussed in the following sections, Williams Geismar’s process safety management program deficiencies that contributed to the incident include: (1) Williams did not perform adequate Management of Change (MOC) or Pre-Startup Safety Reviews (PSSRs) for two significant process changes involving the propylene fractionator reboilers—the installation of block valves and the addition of car seals (see Section 5.1 and Section 5.2.2.1).29 As a result, the company did not evaluate and control all hazards introduced to the process by those changes. Not identifying and controlling the new process overpressurization hazard was causal to the incident; (2) Williams did not adequately implement action items developed during Process Hazard Analyses (PHAs) or recommendations from a contracted pressure relief system engineering analysis (see Section 5.2 and Section 5.4). Consequently, Williams did not effectively apply overpressure protection by either a pressure relief valve or by administrative controls to the standby Reboiler B; and (3) Williams did not perform a hazard analysis and develop a procedure prior to the operations activities conducted on the day of the incident (see Section 5.3).

28 Process safety management programs have been developed and described in industry good practice guidance (such as books published by the Center for Chemical Process Safety) and are required by both OSHA as part of its Process Safety Management (PSM) regulation and by the Environmental Protection Agency (EPA) as part of its Chemical Accident Prevention provisions (commonly referred to as its Risk Management Program (RMP) regulation). See 29 C.F.R. § 1910.119. Process Safety Management of Highly Hazardous Chemicals and 40 C.F.R. Part 68, Subpart D - Program 3 Prevention Program. 29 A car seal is a mechanical device that physically locks a valve in the open or closed position to prevent manipulation by an unauthorized person. A car seal is an administrative control. Nonmandatory Appendix M-5 of ASME Boiler and Pressure Vessel Code, Section VIII, Division 1, allows for the use of administrative controls such as car seals to ensure an open path between a pressure vessel and its pressure relief device(s). In recent years, process safety culture has been a topic of increased focus within the chemical process industry. “Safety Culture” is often simply described as “the way we do things around here,” or “how we behave when no one is watching.” The chemical process industry has defined process safety culture as “[t]he common set of values, behaviors, and norms at all levels in a facility or in the wider organization that affect process safety.”i A significant determinant of an organization’s process safety culture is the quality of its written safety management programs (e.g., process safety management procedures, including PHA, MOC, PSSR, operating procedures; and written corporate policies) and how well individuals within the organization, ranging from the CEO to the field operator, implement those programs. The Center for Chemical Process Safety has labeled these two facets as “Conduct of Operations” and “Operational Discipline,” respectively.ii Improving an organization’s process safety culture starts with management. Managers can help to set a high bar for the organization’s commitment to effectively implementing safety management programs and company expectations. i. Center for Chemical Process Safety (CCPS). Conduct of Operations and Operational Discipline—For Improving Process Safety in Industry; John Wiley & Sons, Inc.: Hoboken, New Jersey, 2011. ii. Ibid. Process Safety Culture

20 CSB · Williams Geismar Case Study

When the quench water valves were opened, therefore, there were no safeguards to prevent high pressure on the shell side of the reboiler. Since the reboiler lacked adequate overpressure protection, introducing heat to the standby reboiler initiated the overpressure event that caused the reboiler to rupture catastrophically.

“The process safety culture of an organization is a significant determinant of how it will approach process risk control issues, and process safety management system failures can often be linked to cultural deficiencies. Accordingly, enlightened organizations are increasingly seeking to identify and address such cultural root causes of process safety performance problems.” CCPS, Guidelines for Risk Based Process Safety, 2007.

CSB · Williams Geismar Case Study 21

FIGURE 13 Timeline of events leading to the June 2013 incident.

22 CSB · Williams Geismar Case Study

  1. 1

REBOILER VALVES INSTALLATION The original 1967 design of the propylene fractionator required both Reboiler A and Reboiler B in service at the same time. This design had no valves between the reboilers and the propylene fractionator, protecting the two reboilers from overpressure with the relief device located on top of the propylene fractionator. In subsequent years, Williams determined that the propylene fractionator could operate with only one reboiler in service. Operating with a single reboiler allowed continuous propylene fractionator operation and avoided shutdowns when the reboiler tubes fouled and required cleaning. To implement single reboiler operation, in 2000 Williams Geismar management approved a $270,000 investment to install valves on both the process side and quench water side of six of the quench water heat exchangers, including the propylene fractionator’s Reboiler A and Reboiler B. In 2001, Williams installed the valves (Figure 14); however, Williams did not identify the overpressure hazard that resulted from this change.

FIGURE 14 Illustration of the propylene fractionator reboilers prior to the incident, with shell-side piping shown. The four shell-side process valves were installed in 2001. ***Note: Tube-side piping not illustrated

CSB · Williams Geismar Case Study 23

  1. 1.1

VALVE INSTALLATION MANAGEMENT OF CHANGE Industry good practice guidance advises—and the OSHA PSM regulation and the EPA RMP regulation require—chemical process facilities to conduct a Management of Change (MOC) review before making a change to a covered process, such as a change in equipment.30 Among other requirements, OSHA and EPA require that a facility’s MOC reviews consider the impact of the change on safety and health, and whether operating procedures need modifications. OSHA and EPA also require that companies train affected employees on the change prior to startup or implementation.31 In 2001, Williams performed one MOC to cover the installation of valves on the six quench water heat exchangers identified in the 2000 proposal, including the propylene fractionator Reboiler A and Reboiler B. The Williams MOC process required the Operations Department, Maintenance Department, Technical Department, Environmental Department, Safety Department, and Project Engineering Department to consider the potential safety implications of installing the valves. They did this by answering checklist questions used to prompt targeted analysis for each department. Department managers were required to respond to each prompt by checking “yes,” “no,” or “n/a” (not applicable). While MOC checklists can ensure consideration of common hazards and typical change requirements, the Williams MOC reviewers nevertheless did not identify the serious overpressure hazards introduced by installing valves on the reboilers.32

30 29 C.F.R. § 1910.119(l) and 40 C.F.R. § 68.75. 31 29 C.F.R. § 1910.119(l)(3) and 40 C.F.R. § 68.75. 32 Installing block valves into a process can introduce overpressure hazards to process equipment. The ASME Boiler and Pressure Vessel Code allows block valves to be installed in a relief path where there is normally process flow, as long as the user provides a method of overpressure protection, such as applying administrative controls, mechanical locking elements, valve failure controls, and valve operation controls to provide an open path between the vessel and its pressure relief device(s). See American Society of Mechanical Engineers. ASME Boiler and Pressure Vessel Code, 2015. Section VIII, Division 1, UG-135 and Nonmandatory Appendix M-5.7(3). KEY LESSON

Robust Management of Change (MOC) practices are needed to ensure the review analyzes hazards in the entire process affected by the change. Similar to PHAs, conducting MOC reviews as a multidisciplinary group— composed of individuals with different experiences and different areas of expertise—can assist in identifying hazards introduced by a process change. Companies must conduct MOCs before implementing a change in the field, and should not treat them as a paperwork or check-the-box exercise.

24 CSB · Williams Geismar Case Study

  1. 1.1.1 MANAGEMENT OF CHANGE PERFORMED AFTER VALVE INSTALLATION

The MOC process at Williams intended to provide a method33 to identify and control34 all possible hazards presented by a process change before making the process change in the facility.35 Williams, however, did not perform an MOC before installing and commissioning the new block valves on the reboilers. In fact, Williams did not perform the MOC until after the plant was operating with the new valves.36 The MOC was an after-the- fact activity for Williams to address a regulatory requirement rather than an effective tool used to identify and control new process hazards prior to installing the new equipment.

  1. 1.1.2 MANAGEMENT OF CHANGE DID NOT IDENTIFY SIGNIFICANT HAZARDS

Installing block valves into a process where they previously did not exist is a significant process change that needs careful safety analysis during the MOC review. But the Williams 2001 MOC review did not identify the significant overpressure hazard introduced by the valves. Figure 15 highlights portions of the Williams MOC that the CSB identified as ineffective assessment of the change presented by the new valves. These weaknesses include: (1) The Williams MOC failed to identify or control the overpressure hazard. The MOC reviewers indicated that the valves did not have to be car sealed open (Figure 15), which would have provided overpressure protection for the reboilers. The option of using a car seal was the only specified overpressure protection method on the MOC checklist, even though in this case installing pressure relief valves could be a better option. Nevertheless, the MOC reviewers did not identify that the reboilers required overpressure protection—through either an open path to a pressure relief device using a car sealed open valve, or by installing a pressure relief device on each reboiler;

33 The Williams Geismar MOC procedure states, “the purpose of the MOC review process is to include a safety/health, environmental, technical, mechanical, engineering, and operations review of the change. Changes shall be reviewed for impact on safeguards, critical instrument systems, pressure relief systems, equipment inspection programs, operability of equipment, constraints in currently approved process or mechanical design, and operating procedures.” 34 The OSHA PSM and EPA RMP regulations do not specify that the purpose of the MOC is to identify and control hazards introduced by the process change. Rather, the regulations specify that the “impact of change on safety and health” must be considered. Industry guidance publications, as well as Williams’ internal MOC procedure, specify that MOCs should identify and control hazards introduced by the change prior to startup. 35 OSHA PSM and EPA RMP regulations require MOCs prior to the change. See 29 C.F.R. § 1910.119(l)(2) and 40 C.F.R. § 68.75(b). 36 Plant data indicates the unit was shut down between January 4, 2001 and February 20, 2001. The valves were installed during this period. The PSSR for the valves’ installation was performed on February 1, 2001, but the MOC was not initiated until March 2, 2001, and was not approved until April 6, 2001. OSHA PSM requires the MOC prior to implementing the change. See 29 C.F.R. § 1910.119(l)(2). When “it is difficult to get all of the required authorizations prior to implementation of the change […] [a]bove all, this indicates that there is a potential process safety culture issue that must be addressed. Site management should not tolerate the startup of a change prior to obtaining the necessary authorizations.” CCPS, Guidelines for Management of Change for Process Safety, 2008.

CSB · Williams Geismar Case Study 25

FIGURE 15 Portion of the MOC performed by Williams for the installation of the valves on Reboilers A and B. Yellow highlights indicate weaknesses in MOC analysis. Note: Image of document is poor quality.

26 CSB · Williams Geismar Case Study

(2) The MOC reviewers incorrectly indicated that existing operating procedures were adequate to account for the new valves, even though there was no procedure specifically for switching the propylene fractionator reboilers. The CSB found that Williams Geismar had relied on its generic procedure, last revised in 1996, to start up any reboiler within the entire facility. Williams considered this generic procedure applicable to start up the propylene fractionator Reboiler B; however, Williams’ generic procedure was based on the assumption that all reboilers had the process fluid on the tube side of the reboiler (Figure 16), which was not the configuration of the propylene fractionator Reboiler B. As a result, attempting to use this generic procedure to start up Reboiler B could be confusing to workers and could result in initiating an overpressure scenario on the shell side of Reboiler B—a pressure vessel that was not equipped with a protective pressure relief device. A robust, equipment-specific procedure detailing the steps to switch the propylene fractionator reboilers should communicate the importance of opening the process valves (cold side) before opening the quench water valves (hot side), and should communicate the importance of overpressure protection. The MOC process is intended to trigger—and should have triggered—the development of such a procedure: a procedure that is equipment-specific and addresses the hazards of the operation; (3) The MOC reviewers improperly indicated that the change did not require a Process Hazard Analysis (PHA), a more robust hazard evaluation option performed at the discretion of the MOC reviewers. The installation of the valves introduced a serious overpressure hazard to the reboilers, and a formal PHA would have been the best opportunity to identify and control that hazard; and (4) The MOC reviewers selected incorrect responses regarding whether the new equipment met all applicable codes and standards. Reviewers indicated either the valves met all codes and standards, or that the question was not applicable. The addition of the valves without ensuring overpressure protection for the reboilers, however, does not meet requirements within industry codes and standards by the American Petroleum Institute (API), and the American Society of Mechanical Engineers (ASME).37

37 Louisiana has not adopted Section VIII of the ASME Boiler and Pressure Vessel Code; however, Williams Geismar specified in site policy documents that they will follow the Code’s requirements. “Overpressure” in equipment occurs when the equipment is subjected to a pressure that exceeds a pre-defined pressure limit, such as the maximum allowable working pressure (MAWP). Such defined pressure limits are used to prevent equipment mechanical failure due to excess pressure. There are several methods to protect equipment from overpressure. One is the use of a pressure relief valve. Pressure relief valves are designed to open and relieve excess pressure by releasing process fluids from equipment when the equipment reaches a specified pressure set point. They are an “active control” that requires no human activation to function.

Photo of a pressure relief valve

Overpressure protection can also be provided to equipment by ensuring an open path to pressure relief by a locked open block valve. Valves are commonly locked open by using a “car seal,” a mechanical device that physically locks a valve in the open or closed position to prevent manipulation by an unauthorized person. Car seals are “administrative controls” that rely on human operation. They can be more prone to failure than active controls.

Depiction of a Car Seali

i. Car seal depiction from Total Lockout Website. Car Seals. http://www.totallockout.com/online-store/car-seals-2/ (accessed November 19, 2015). Overpressure Protection Methods

CSB · Williams Geismar Case Study 27

FIGURE 16 Schematic from the Williams Geismar Generic Reboiler Startup Procedure. This was the applicable procedure to startup the propylene fractionator reboilers. Since the procedure uses the reverse of the Reboiler B configuration, it can be confusing, and workers could initiate a high-pressure scenario on the shell (process) side. Williams had not equipped this reboiler with a protective pressure relief device.

28 CSB · Williams Geismar Case Study

The selected responses in the MOC checklist indicate that the reviewers focused largely on managing documentation and maintenance requirements for the new valves, such as needed process safety information updates and inspection requirements, and not on how the addition of the valves could affect the operability and safety of the overall process. Not only does this “focus-on-the-new-equipment-only” approach to conducting Management of Change not meet the intent of regulatory requirements,38 it can be dangerous. Williams introduced hazards that it did not fully understand or control. 5.1.1.3 PRE-STARTUP SAFETY REVIEW WAS INEFFECTIVE Following the installation of the propylene fractionator Reboiler A and Reboiler B valves, Williams performed a Pre-Startup Safety Review (PSSR) as required by process safety management regulations.39 Conducting the Williams PSSR required filling out a 21-question form. The CSB found that Williams reviewers either did not answer or incorrectly answered key PSSR process safety questions. Figure 17 shows a selection of these questions and their responses. The Williams PSSR instructions directed the reviewer to “Circle the appropriate response.” But each PSSR prompt question did not have a circled answer in the completed and management-approved documentation. The PSSR questions that Williams reviewers did not answer or answered incorrectly were areas that played a direct role in the June 13, 2013 incident. For example: • No response was given to the question, “Has a process hazard analysis been completed, recommendations resolved, and incorporated in design as deemed appropriate?” A PHA was not conducted, which could have identified hazards introduced by the valves;

38 The OSHA PSM and EPA RMP regulations require that Management of Change procedures shall ensure that the “impact of change on safety and health” is considered and addressed prior to the change. See 29 C.F.R. § 1910.119(l)(2)(ii) and 40 C.F.R. § 68.75(b)(2). 39 The OSHA Process Safety Management (PSM) regulation requires that “[t]he employer shall perform a pre-startup safety review for new facilities and for modified facilities when the modification is significant enough to require a change in the process safety information.” See 29 C.F.R. § 1910.119(i)(1). The EPA RMP regulation requires that “[t]he owner or operator shall perform a pre-startup safety review for new stationary sources and for modified stationary sources when the modification is significant enough to require a change in the process safety information.” See 40 C.F.R. § 68.77. Both regulations also state that the pre- startup safety review shall confirm, “safety, operating, maintenance, and emergency procedures are in place and are adequate.” KEY LESSON

Management of Change (MOC) practices should ensure the review analyzes hazards in the entire process affected by the change. Similar to PHAs, conducting MOC reviews as a multidisciplinary group—comprised of individuals with different experiences and different areas of expertise—can assist in identifying hazards introduced by a process change. MOCs must be conducted prior to implementing a change in the field. KEY LESSON

Pre-Startup Safety Reviews (PSSRs) are key opportunities to verify effective implementation of design intent, accuracy of process safety information, and proper installation and configuration of field equipment. Companies should conduct thorough and effective PSSRs before placing equipment in service.

CSB · Williams Geismar Case Study 29

• No response was given to the questions regarding operator training, and PSSR reviewers incorrectly answered “yes” to the questions “Are all necessary operating procedures in place and current for safety, environmental, operating, emergencies, maintenance and technical?” and “Are procedures available for new and modified equipment?” Operations personnel were not effectively trained and procedures were not developed to address the new propylene fractionator reboiler startup requirements; and • No response was given to the question, “PRV’s [pressure relief valves] lined up and block valves car sealed open? Pressure release systems in place and operational and traced where appropriate?” The company did not provide effective overpressure protection for the propylene fractionator reboilers. When a company does not effectively implement its written safety management programs—such as only partially completing the PSSR document and incorrectly answering some of the document questions—it indicates a weakness in process safety culture (see Section 9.0). Management’s approval of incomplete documentation can lead to a culture of complacency and, therefore, subpar and incomplete process safety analyses. At a company with a strong commitment to effectively implementing process safety management programs, everyone—from the front line worker to company executives—should perceive incomplete documentation, such as this PSSR document, as unacceptable.

“[U]nauthorized shortcuts should not be tolerated, even if there are short-term benefits.[…] In the absence of [operational discipline], management personnel intentionally turn a blind eye toward what workers do because they are only interested in achieving the desired results.” CCPS, Conduct of Operations and Operational Discipline, 2011. FIGURE 17 Selection of responses on the checklist filled out during the PSSR performed following the 2001 reboiler valve installation. Several key process safety questions were not answered or were answered incorrectly.

30 CSB · Williams Geismar Case Study

  1. 2 PROCESS HAZARD ANALYSES

Both OSHA PSM and the EPA RMP regulations require covered facilities to perform or revalidate a Process Hazard Analysis (PHA) at least every five years to identify, evaluate, and control the hazards involved in the process.40 Industry good practice publications provide guidance on how to conduct effective PHAs.41 Williams performed three PHAs following the installation of the valves on the propylene fractionator reboilers. Williams did not sufficiently implement the recommendations issued in those PHAs and did not effectively mitigate overpressure hazards in the propylene fractionator reboilers. This section analyzes the documented findings, recommendations, and actions taken pertaining to the propylene fractionator reboilers following the three PHAs, which Williams conducted in 2001, 2006, and 2011. 5.2.1 2001 PHA Williams performed a PHA on the process area that included the propylene fractionator reboilers in 2001—the year Williams installed valves on the propylene fractionator reboiler piping. The 2001 PHA evaluated possible consequences of closing the propylene fractionator reboiler process valves when they should be open. The PHA team did not identify reboiler overpressure as a possible safety consequence. Instead, the team identified a low-severity process upset. The CSB notes that an effective PHA should have identified the more serious safety consequence of reboiler overpressure, as it is a typical potential hazard for a pressure vessel. The PHA team correctly identified that the piping and instrumentation diagrams (P&IDs) did not show the new valves on the propylene fractionator reboilers. The PHA team recommended updating the relevant P&ID (Figure 18). The CSB notes that the P&ID update should have been required as part of the MOC process. In addition, the PSSR process should have reviewed a marked-up version of the P&ID showing the approved change. Such a review could have identified the significant error with the engineering drawing.

40 29 C.F.R. § 1910.119(e) and 40 C.F.R. § 68.67(f). 41 See CCPS publications including Center for Chemical Process Safety (CCPS). Guidelines for Hazard Evaluation Procedures. 3rd ed.; John Wiley & Sons, Inc.: Hoboken, New Jersey, 2008 and Frank, Walter L. and Whittle, David K. Revalidating Process Hazard Analyses. American Institute of Chemical Engineers: New York, New York, 2001. KEY LESSON

Overpressure protection is an essential safeguard for all pressure vessels. PHA teams must ensure that all pressure vessels have effective overpressure protection. At a minimum, a pressure relief device is a necessary safeguard to protect process equipment from overpressure scenarios where internal vessel pressure can exceed design code limits.

CSB · Williams Geismar Case Study 31

  1. 2.2 2006 PHA

During the 2006 review, the PHA team emphasized evaluating whether equipment had sufficient overpressure protection. The PHA team identified that the propylene fractionator reboilers “potentially don’t have sufficient relief capabilities – could overpressurize equipment” (Figure 19). As a result, the PHA team issued the following recommendation: Consider locking open at least one of the manual valves associated with each of the propylene fractionator reboilers (EA-425 A/B) so that the relief valves on top of the propylene fractionator can provide thermal relief protection for these reboilers. This 2006 PHA recommendation was marked “Complete” more than three years later in January 2010 in Williams’ action item tracking system. This action item, however, was not implemented as the PHA team had intended. The CSB found that only the shell-side outlet valve of the operating reboiler was car sealed open. The shell-side valves of the standby reboiler remained closed, with no car seals on the manual valves and no protective pressure relief device installed on the shell. This configuration isolated the standby reboiler from the relief device on top of the propylene fractionator, creating a high-risk scenario. This was an implementation error of the PHA recommendation. But as discussed in Section 5.2.2.1, the error remained unidentified because key process safety programs (i.e. MOC and PSSR), which could have identified the implementation error, were not performed. The CSB found that the contracted PHA facilitator was under the incorrect impression that both propylene fractionator reboilers operated at the same time. The CSB was not able to determine why the PHA team did not discuss that in practice only one reboiler operated at a time. This incorrect assumption likely contributed to the PHA team choosing car seals as the recommended overpressure protection strategy, as the shell-side valves would FIGURE 18 Excerpt from Williams Geismar 2001 PHA. The PHA recommended updating the applicable P&ID to indicate the valves installed on the propylene fractionator reboilers.

32 CSB · Williams Geismar Case Study

have to be open for both reboilers to operate. With the knowledge of the current practice—that only one reboiler operated at a time—a recommendation to car seal open both the operating and standby reboilers would be atypical; the standby reboiler would thus not be operating, but still open to the process and filled with process liquid. While unusual, this was a low corrosive and minimally fouling environment, and such a configuration would likely not harm equipment. This configuration, however, would have left an unnecessary inventory of hazardous chemicals in the process. An inherent safety review should identify the opportunity to minimize the hazardous chemical inventory by blinding the standby reboiler from the process.

The CSB notes that pressure relief valves (active safeguards) are a more robust safeguard compared to car seals (administrative safeguards), which are lower on the hierarchy of controls (Section 6.0). Administrative controls such as car seal programs fall low on the hierarchy of controls because of the many types of human factors42 that can reduce or eliminate their effectiveness. Misunderstanding of what equipment to car seal in order to satisfy the 2006 PHA action item likely contributed to only partial completion of the action item, resulting in only the active reboiler being car sealed open. This misunderstanding likely stemmed from the fact it would have been unusual to car seal open the standby reboiler, and the recommendation to car seal open the standby reboiler was a result of confusion by the PHA team. Had the 2006 PHA team instead recommended installing pressure relief valves on both propylene fractionator reboilers, that action item would have been more difficult to implement incorrectly, as the relief valves would be newly installed, fixed equipment.

42 “Human factors” are the environmental, organizational, or job factors, as well as a person’s individual characteristics, which can influence a person’s actions in a way that can affect health and safety. See Health and Safety Executive (HSE), Reducing Error and Influencing Behaviour, 2009, p 5. http://www.hse.gov.uk/pubns/priced/hsg48.pdf (accessed September 7, 2016). KEY LESSON

It is important to ensure that the final implementation of PHA action items addresses the original safety concerns identified by the PHA team. Companies should ensure that action items have been effectively implemented and field verified before closing them out. FIGURE 19 Excerpt from Williams Geismar 2006 PHA. The PHA recommended locking open at least one manual valve on each of the propylene fractionator reboilers to allow for thermal relief protection of the reboilers.

CSB · Williams Geismar Case Study 33

  1. 2.2.1 MANAGEMENT OF CHANGE NOT PERFORMED FOR CAR SEAL INSTALLATION

The installation of a car seal to lock open a propylene fractionator reboiler process valve—as recommended by the 2006 PHA—was a significant process change that required an MOC and a PSSR. But Williams did not perform an MOC or a PSSR for the installation of the car seal.43 The field verification portion of the PSSR should have provided an opportunity to identify that the PHA action item to car seal open a process valve on both reboilers was not complete. Yet, the PSSR was never performed. The CSB determined that Williams did not perform an MOC for the car seal installation likely because key operations personnel did not understand that an MOC was required. Also, before the June 13, 2013 incident, although prohibited by OSHA PSM regulatory requirements and company policies, at times Williams began fieldwork on a process change without a completed and approved MOC. 5.2.3 2011 PHA The next PHA of the propylene fractionator was in 2011. This PHA relied on Williams’ action item tracking system and MOC database to identify changes made to the process since the last PHA. The Williams PHA action item tracking system incorrectly indicated as “complete” the 2006 recommendation to lock open at least one of the manual process valves on each reboiler. Therefore, the PHA facilitator documented as safeguards in the 2011 spreadsheet that valves on both reboilers were car sealed open to provide relief protection (Figure 20). Williams did not perform a field verification of the documented safeguards as part of the PHA. As a result, they did not identify the discrepancy between documentation and the actual equipment installed in the field.

43 Performing an MOC and PSSR for this type of process change was required by OSHA PSM, EPA RMP Regulation, and by the Williams Geismar internal site policy on Management of Change. FIGURE 20 Excerpt from Williams Geismar 2011 PHA. The PHA recommended updating the propylene fractionator P&ID to show that the reboilers were car sealed open.

34 CSB · Williams Geismar Case Study

Relying on erroneous documentation that the outlet valve for each propylene fractionator reboiler was car sealed open, the 2011 PHA team identified that the applicable P&ID did not show the car seals. Therefore, the PHA team recommended updating the relevant P&ID (Figure 20): Update P&ID 8F to indicate that one manual valve associated with each propylene fractionator reboiler (EA-425 A/B) is car sealed open to ensure that the relief valves on top of the propylene fractionator provide thermal relief protection for the reboilers. In a May 2012 email, the Engineering Records Coordinator communicated to the PSM Coordinator that “[a]ccording to the car seal list only the in service exchanger is to be car sealed open. I will put a note on the P&ID to reflect this.” The Engineering Records Coordinator added a note to the applicable P&ID: The in service EA-425A/B Exchangers 18” block valve will be tagged (CSO) in the field to insure that the reboiler gets thermal protection from SV-421QA/QB.44 (emphasis added). This P&ID change did not address the full intent of the recommendation issued in the 2011 PHA because the standby reboiler valve was not car sealed open. Williams management, however, approved this recommendation as complete without verifying that the recommendation was implemented as intended. The PSM Coordinator tracked the status of the 2011 PHA recommendation as “Complete” in the PHA action item tracking spreadsheet, and did not include the additional emailed information provided by the Engineering Records Coordinator in the PHA action item tracking documentation.

Williams did not perform an MOC and PSSR for the installation of the car seal on the in-service propylene fractionator reboiler (see Section 5.2.2.1). Effectively performing these process safety programs could have identified that both reboilers required car seals and ensured accurate process safety information.

44 “CSO” is an acronym for “car sealed open.” “SV-421QA/QB” is the tag number for the pressure relief valves on top of the propylene fractionator. “More than ever before, companies recognize that insufficient control of changes plays a major role in accidents. … Experience has demonstrated that inadvertent, unintended, erroneous, or poorly performed changes – changes whose risk is not properly understood – can result in catastrophic fires, explosions, or toxic releases.” CCPS, Guidelines for Management of Change for Process Safety, 2008

CSB · Williams Geismar Case Study 35

  1. 3 LACK OF HAZARD ANALYSIS AND OPERATING PROCEDURE

On the day of the incident, a decreasing quench water flow through the propylene fractionator reboiler (Reboiler A) prompted the operations supervisor to enter the process unit to evaluate the cause of the decreased flow. During this evaluation, evidence indicates that the operations supervisor likely opened the quench water valves (hot side) on the standby reboiler (Reboiler B) while its shell-side process valves (cold side) remained closed, initiating the overpressure event. Prior to manipulating valves in the field, Williams did not conduct a hazard analysis and develop a procedure for the operations activity.45 The CSB could not conclusively determine the reason for opening these valves. As demonstrated by this incident, it can be hazardous to conduct field operations— both to personnel performing the operation and to personnel working in the vicinity—without first establishing procedures and evaluating and controlling hazards. As fouling in the quench water system was a known historical issue, Williams should have developed a procedure prior to the day of the incident detailing the method to assess the quench water system to identify the fouled heat exchanger. Furthermore, Williams could have better managed the heat exchanger fouling by establishing a routine maintenance schedule to take off-line and clean this equipment, which was known to foul, prior to the occurrence of any process deviations.

45 OSHA issued a “Willful” violation to Williams, with a proposed fine of $70,000, for not developing and implementing “written operating procedures that provide clear instructions for safely conducting activities…” This citation was contested by Williams, and was ultimately reduced to a “Serious” violation with a fine of $7,000. This resulted in a total fine amount of $36,000 for the violations identified by OSHA following the incident. (OSHA Inspection Number 915682). KEY LESSON

Operating procedures need sufficient detail to ensure effective performance of critical steps, including performing steps in the correct order. Affected employees such as operators must receive training on the procedures. Management must establish expectations to maintain and follow accurate procedures. “[T]reating procedures as if they were equipment (just like a pump, valve, reactor, or safety system), is fundamental for building a successful Process Safety Management system. Who would start up a new process without all of the pumps in place and tested? What craftsperson would tackle a pump seal replacement without the required tools and parts? By accepting this idea, that procedures are components, the [concept of requiring effective procedures] will naturally fall into place.” CCPS, Guidelines for Writing Effective Operating and Maintenance Procedures, 1996

36 CSB · Williams Geismar Case Study

Detailed written procedures can ensure that operations activities are safe and hazards are effectively controlled. In its book Guidelines for Writing Effective Operating and Maintenance Procedures, the Center for Chemical Process Safety (CCPS) states:

Procedures should identify the hazards presented by the process. Procedures should also state precautions necessary to prevent accidental chemical release, exposure, and injury. Process safety information is an important resource in developing procedures. Using this information ensures that the known hazards are addressed properly.46 When a process condition requires operator activity in the field, such as opening or closing valves, these operation activities can present hazards to workers. Before starting such field operations, a company’s process safety management system should ensure a procedure is developed and a thorough hazard evaluation is performed to identify and control hazards.

  1. 4

RELIEF VALVE ENGINEERING ANALYSIS The ASME Boiler and Pressure Vessel Code requires that all pressure vessels “shall be provided with overpressure protection […].”47 Williams contracted an engineering services firm to perform a relief valve engineering analysis of the Williams Geismar facility in 2008 to ensure the valves were properly sized for the equipment they were designed to protect. The analysis identified that the propylene fractionator reboilers did not have sufficient overpressure protection. A finding listed in the contractor’s analysis states: There are block valves at the inlet and outlet to the shell side of [the propylene fractionator reboilers]. Because those valves are not [car sealed open], [the propylene fractionator relief valves] will not provide overpressure protection to the shell side of the reboilers in the event of a fire or in the event of liquid expanding/vaporizing due to heat input from the hot side. Unless these valves are car sealed open, additional overpressure protection will be needed for the shell side of [the propylene fractionator reboilers]. The engineer who performed the relief valve engineering analysis also directly emailed a Williams project engineer, alerting him of the lack of overpressure protection on the reboilers, and indicating the two options to provide overpressure protection to the reboilers. Figure 21 shows her email. The CSB learned that Williams did not develop an action item to address this relief valve engineering analysis for the propylene fractionator reboilers. Williams determined their existing plan to car seal open both reboilers, from the recommendation in the 2006 PHA, would address the hazard. Because the company did not fully implement the 2006 PHA action item, this overpressure hazard remained unmitigated (see Section 5.2.2.).

46 Center for Chemical Process Safety (CCPS). Guidelines for Writing Effective Operating and Maintenance Procedures; American Institute of Chemical Engineers: New York, New York, 1996; p 18. 47 American Society of Mechanical Engineers. ASME Boiler and Pressure Vessel Code, 2015. Section VIII, Division 1, UG-125.

CSB · Williams Geismar Case Study 37

FIGURE 21 Email from engineering services firm engineer to Williams employee alerting that the propylene fractionator reboilers were not protected from overpressure. In figure, “SV-421QA/QB” are the propylene fractionator relief valves. “DA-406” is the propylene fractionator column. “EA-425A/B” are the propylene fractionator reboilers.

38 CSB · Williams Geismar Case Study

  1. 0 HIERARCHY OF CONTROLS

The Hierarchy of Controls48 is a method to provide effective risk reduction by applying, in order of robustness, inherently safer design, passive safeguards, active safeguards, and procedural safeguards (Figure 22).49 This strategy promotes a tiered or hierarchical approach to risk management. The higher in the hierarchy, the more effective the risk reduction achieved. Applying the hierarchy of controls at the design phase is the best opportunity to ensure that process hazards are properly analyzed and risks are effectively reduced, before the design is implemented in the field. After the design phase, when construction is complete and the process is operating, process safety management programs such as MOC and PHA are important opportunities to apply the hierarchy of controls to further reduce risk throughout the life of a process.

Williams did not effectively use the hierarchy of controls in the 2001 design change that added block valves to the propylene fractionator reboilers. Williams also missed key opportunities in its 2001, 2006, and 2011 PHAs to implement the hierarchy of controls when analyzing the risk of overpressure for the propylene fractionator reboilers.50 Instead of applying inherently safer design, passive safeguards, or active safeguards—design strategies that are higher on the hierarchy of controls—Williams relied upon administrative controls to mitigate a serious overpressure hazard. The use of a pressure relief valve is an “Active Safeguard”—a safeguard that requires a specific device to function when needed. Car seals, the safeguard chosen by Williams to provide a path to pressure relief for the reboilers, are

48 The CSB describes the concept of the “Hierarchy of Controls” in several previous investigation reports. See the CSB final reports on the Tesoro Anacortes Refinery investigation, the Chevron Richmond Refinery investigation, and “Key Lessons for Preventing Incidents from Flammable Chemicals in Educational Demonstrations.” (accessed August 17, 2016) 49 Center for Chemical Process Safety (CCPS). Inherently Safer Chemical Processes – A Life Cycle Approach. 2nd ed.; John Wiley & Sons, Inc.: Hoboken, New Jersey, 2009; Section 2.1. 50 As a result of its investigation of the 2012 Chevron refinery pipe rupture and fire in Richmond, California, the CSB recommended that the State of California update its process safety regulations to require the use of the hierarchy of controls in establishing safeguards for identified process hazards. FIGURE 22 Hierarchy of Controls. The higher in the hierarchy (further to the left), the more effective the risk reduction achieved. KEY LESSON

PHA and MOC teams should effectively use the hierarchy of controls to the greatest extent feasible when evaluating safeguards. Pressure relief devices are typically more robust safeguards than car seals. Pressure relief devices (active safeguards) are higher on the hierarchy of controls than car seals (administrative controls).

CSB · Williams Geismar Case Study 39

“Procedural Safeguards,” also known as “Administrative Controls.” Procedural safeguards require an action by a person, and are lower on the hierarchy of controls than active safeguards because of the many types of human factors that can reduce or eliminate their effectiveness. During the 2011 PHA, Williams correctly identified the high potential severity from equipment rupture, but incorrectly assessed the likelihood of an overpressure incident (see severity (S) and likelihood (L) rating in Figure 20). The 2011 PHA team categorized the likelihood of a propylene fractionator reboiler overpressurization as “improbable.” Such a low frequency indicates a weak evaluation and poor understanding of the availability of procedural safeguards such as car seals. CCPS Layer of Protection Analysis guidance suggests that users consider pressure relief valves to have 99 percent availability,51 while car seal availability is only 90 percent.52 Therefore, installing a pressure relief valve on the shell side of each propylene fractionator reboiler, the design strategy Williams applied post-incident, is a more robust approach to reduce the likelihood of an overpressure event than the use of car seals, an administrative control that is more prone to failure, and in fact did fail in this case.

51 CCPS provides a value of 0.01 as the generic probability of failure on demand for spring-operated pressure relief valves. See Center for Chemical Process Safety (CCPS). Guidelines for Initiating Events and Independent Protection Layers in Layer of Protection Analysis; Center for Chemical Process Safety / American Institute of Chemical Engineers: New York, New York, 2014; p 180. 52 CCPS provides a value of 0.1 as the generic probability of failure on demand for adjustable movement-limiting devices such as car seals. See Center for Chemical Process Safety (CCPS). Guidelines for Initiating Events and Independent Protection Layers in Layer of Protection Analysis; Center for Chemical Process Safety / American Institute of Chemical Engineers: New York, New York, 2014; p 260. “Administrative controls provide another safeguard or layer of protection, but should not be relied on in lieu of practical engineered controls. Administrative approaches that require human action can increase the likelihood of human error.” CCPS, A Practical Approach to Hazard Identification for Operations and Maintenance Workers, 2010

40 CSB · Williams Geismar Case Study

  1. 0 INDUSTRY CODES AND STANDARDS

The American Petroleum Institute (API), the American Society of Mechanical Engineers (ASME), and The National Board of Boiler and Pressure Vessel Inspectors develop codes and standards that detail requirements and recommended practices for overpressure protection of pressure vessels. 7.1 AMERICAN PETROLEUM INSTITUTE API is an industry trade association that develops standards and recommended practices for the oil and natural gas industry. These publications apply to petrochemical facilities, including the Williams Geismar Olefins Plant. At the time of the June 13, 2013 incident, the fifth edition (2007) of the API Standard 521, Pressure-Relieving and Depressuring Systems (“API 521-2007”) was the recognized and generally accepted good engineering practice (RAGAGEP) for pressure relieving and disposal systems. API 521-2007 divided guidelines into four main sections: causes of overpressure, determination of individual relieving rates, selection of disposal systems, and disposal systems. The CSB identifies below weaknesses and ambiguities in the “causes of overpressure” guidelines. API 521-2007 does not specifically address the hierarchy of controls; however, the standard does address the use of administrative controls and recommends the user apply “good engineering judgment” or “sound engineering judgment.”53 API 521-2007 provides guidance regarding inadvertent closure of a manual block valve on the outlet of an on-stream pressure vessel, which is applicable to the valves on the Williams propylene fractionator reboilers. The guidance presents users with a choice between two seemingly equivalent options: either install a pressure relief device or develop an administrative control. The API 521-2007 guidance states: The inadvertent closure of a manual block valve on the outlet of a pressure vessel while the equipment is on stream can expose the vessel to a pressure that exceeds the maximum allowable working pressure. If closure of an outlet-block valve can result in overpressure, a pressure-relief device is required unless administrative controls are in place.54 The API 521-2007 guidance cautions the user that catastrophic failure can occur when relying on administrative control, but the guidance is vague: If the pressure resulting from the failure of administrative controls can exceed the corrected hydrotest pressure55 […], reliance on administrative controls as the sole means to prevent overpressure might not be appropriate. The user is cautioned that some systems can have unacceptable risk due to failure of administrative controls and resulting consequences due

53 API does not define “good engineering judgment” or “sound engineering judgment;” however, it is generally taken to mean that users should apply their engineering knowledge when developing a qualitative basis for a design using the standard. 54 API Standard 521, 5th ed. Pressure-relieving and Depressuring Systems, January 2007, section 4.3.2. 55 API defines corrected hydrotest pressure as “hydrostatic test pressure multiplied by the ratio of stress value at design temperature to the stress value at test temperature.”

CSB · Williams Geismar Case Study 41

to loss of containment. In these cases, limiting the overpressure to the normally allowable overpressure can be more appropriate.56 Given the design of the Williams propylene fractionator reboilers, it was possible to exceed the corrected hydrotest pressure. (The maximum allowable working pressure was 300 psig, and the hydrostatic test pressure was 450 psig. Metallurgical analysis indicates the reboiler shell exceeded this pressure during the event, failing at a pressure of at least 674 psig.)57 The email shown in Figure 21 provides evidence that the API 521-2007 approach was applied during the relief valve engineering analysis at Williams. The engineering analysis performed on the propylene fractionator reboilers resulted in a choice between either installing car seals or adding pressure relief devices. Williams selected the car seal approach. In January 2014, seven months after the Williams incident, API published a new (Sixth) edition of API Standard 521, Pressure-relieving and Depressuring Systems (“API 521-2014”). The new version of the standard has significant improvements that address the gaps and ambiguities in API 521-2007 that contributed to the Williams incident. As shown below, when evaluating situations like the propylene fractionator reboilers at Williams, API 521-2014 requires a pressure relief device, prohibits reliance on administrative controls, and highlights the importance of the hierarchy of controls. The inadvertent closure of a valve on the outlet of pressure equipment while the equipment is on stream can expose the equipment to a pressure that exceeds the MAWP. Every valve (i.e. manual, control, or remotely operated) should be considered as being subject to inadvertent operation. If closure of an outlet valve can result in pressure in excess of that allowed by the design code, a PRD [pressure relief device] is required.58 (emphasis added) In the case of a manual valve, administrative controls can be used to prevent the closed outlet scenario unless the resulting pressure exceeds the maximum allowed by the pressure design code […].59 A hierarchy of measures should be used to ensure equipment is not subject to excess pressure. Such a hierarchy first involves avoiding or reducing risks, then providing engineering controls, and finally providing administrative controls. Avoiding risks includes, for example, setting the MAWP of the equipment above the maximum pressure of all possible sources. Engineering controls include providing pressure relief on the vessel. Administrative controls include provision of block valves of the locked-open design. The user is cautioned that some systems may have unacceptable risk due to failure of administrative controls and resulting consequences due to loss of containment.60 Although API 521-2014 made significant safety improvements that address API 521-2007 weaknesses revealed by the Williams incident, additional gaps still exist. For example, in one area of the standard that addresses hydraulic (thermal) expansion, the requirement to use a relief valve is not restated, and the language indicates that

56 API Standard 521, 5th ed. Pressure-relieving and Depressuring Systems, January 2007, section 4.3.2. 57 See Metallurgical Evaluation of Williams Olefins Ruptured Reboiler EA-425B in Appendix C. 58 API Standard 521, 6th ed. Pressure-relieving and Depressuring Systems, January 2014, section 4.4.2.1. 59 Ibid. 60 API Standard 521, 6th ed. Pressure-relieving and Depressuring Systems, January 2014, section 4.2.1.

42 CSB · Williams Geismar Case Study

administrative controls may be relied upon when a relief valve is not installed on a heat exchanger—even when the corrected hydrotest pressure can be exceeded. [C]losing the cold-fluid block valves on the exchanger unit should be controlled by administrative procedures and possibly the addition of signs stipulating the proper venting and draining procedures when shutting down and blocking in. Such cases are acceptable and do not compromise the safety of personnel or equipment, but the designer is cautioned to review each case carefully before deciding that a relieving device based on hydraulic expansion is not warranted because the corrected hydrotest pressure could be exceeded if the administrative procedures are not followed. 61 This language contradicts the language in the standard requiring a pressure relief device for scenarios that develop pressure greater than allowed by the design code. API should further enhance this standard to help prevent overpressurization incidents caused by failure of administrative controls by clearly requiring a pressure relief device for overpressure scenarios that can result in pressure greater than allowed by the design code. 7.2 AMERICAN SOCIETY OF MECHANICAL ENGINEERS The American Society of Mechanical Engineers (ASME) Boiler and Pressure Vessel Code, Section VIII, provides requirements for pressure vessel construction, inspection, and testing, including requirements for overpressure protection. Section UG-135 “Installation” details the requirements for placement of pressure relief devices on pressure vessels. UG-135 directs users to Nonmandatory Appendix M for guidance on placement of stop (block) valves between a pressure vessel and its relief device. Nonmandatory Appendix M, Section M-5.7, states that, “Stop valve(s), excluding remotely operated valves and process control valves, may be provided in the relief path where there is normally a process flow [...].”62 In order to install a block valve in the path between a vessel and its pressure relief device, the appendix specifies management system and design guidance. In situations where the closure of the stop (block) valve could overpressure a vessel, the appendix allows the user to “apply administrative controls, mechanical locking elements, valve failure controls, and valve operation controls[.]”63 While Louisiana has not adopted the ASME Boiler and Pressure Vessel Code, Section VIII, Williams Geismar has chosen to comply with the Code’s requirements. The CSB encourages all companies to follow the more robust pressure relief requirements in API 521-2014 that require a relief device if the overpressure scenario can result in pressure greater than allowed by the design code.

61 API Standard 521, 6th ed. Pressure-relieving and Depressuring Systems, January 2014, section 4.4.12.1. 62 American Society of Mechanical Engineers. ASME Boiler and Pressure Vessel Code, 2015. Section VIII, Division 1, Nonmandatory Appendix M, Section M-5.7. 63 Ibid.

CSB · Williams Geismar Case Study 43

  1. 3

THE NATIONAL BOARD OF BOILER AND PRESSURE VESSEL INSPECTORS The National Board Inspection Code (NBIC), developed by the National Board of Boiler and Pressure Vessel Inspectors, provides rules for installation, inspection, repair, and alteration of pressure vessels. Part 1, Section 4.5 Pressure Relief Devices details requirements for placement of pressure relief devices on pressure vessels.64 Section 4.5.3 Location states:

The pressure relief device shall be installed directly on the pressure vessel, unless the source of pressure is external to the vessel and is under such positive control that the pressure cannot exceed the maximum overpressure permitted by the original code of construction and the pressure relief device cannot be isolated from the vessel, except as permitted by NBIC Part 1, 4.5.6 e)2).65

That section states:

[W]hen necessary for the continuous operation of processing equipment … a full area stop valve between a pressure vessel and its pressure relief device should be provided for inspection and repair purposes only.66 (emphasis added)

At Williams, because the source of overpressuring the reboilers was internal to the vessel (i.e. hot quench water flowing through the vessel could cause the vessel to overpressure), the NBIC requires installing the pressure relief device directly on the vessel. The design of the Williams reboilers did not meet this design requirement. Louisiana, however, has not adopted this portion of the NBIC and Williams did not list the NBIC as a standard it would voluntarily follow.

64 Previous versions of the NBIC had similar requirements as the 2015 version. 65 The National Board of Boiler and Pressure Vessel Inspectors. National Board Inspection Code, 2015. Part 1-Installation, Section 4.5.3. 66 The National Board of Boiler and Pressure Vessel Inspectors. National Board Inspection Code, 2015. Part 1-Installation, Section 4.5.6, e2.

44 CSB · Williams Geismar Case Study

  1. 0 WILLIAMS GEISMAR POST-INCIDENT CHANGES

Williams made positive changes to its Geismar facility process safety management programs following the incident. Williams personnel told the CSB that a significant cultural shift occurred after the incident in understanding the importance of process safety programs in key areas where weaknesses contributed to the incident. The following sections detail some improvements that Williams Geismar implemented following the incident. 8.1 NEW REBOILER DESIGN Following the June 13, 2013 incident, Williams redesigned the propylene fractionator reboilers to include a pressure relief valve on the shell side of each reboiler (Figure 23). Discussed in Section 6.0, this design strategy of using pressure relief valves, categorized as active safeguards, is higher on the hierarchy of controls than using administrative controls, such as a car seals. This practice also aligns with guidance published by the American Petroleum Institute in API 521-2014 (see Section 7.0), which cautions the user that failure of administrative overpressure protection controls can lead to unacceptable risks. The Williams post-incident design also aligns with guidance published by the NBIC, which requires a pressure relief device installed directly on the reboiler.

FIGURE 23 Post-incident, the Williams Geismar facility added pressure relief valves to the shell side of Reboiler A and Reboiler B.

CSB · Williams Geismar Case Study 45

  1. 2

IMPROVED MANAGEMENT OF CHANGE PROCESS Before the incident, the Williams Geismar MOC reviews occurred in a sequential process, one person at a time, where the MOC document passed from reviewer to reviewer—a process that often occurred while the reviewers remained in their offices. Following the incident, Williams changed its MOC review to a more collaborative process, requiring an “MOC Review Team” to review every MOC in a group setting. Williams Geismar personnel informed the CSB that this new MOC process facilitates better identification of hazards introduced by proposed changes. An improved MOC process could have helped improve the hazard identification and evaluation process conducted in the 2001 MOC for the installation of the block valves on the propylene fractionator reboilers. A Williams technical employee described to the CSB the new MOC process: Pre-incident, an MOC was written, it was brought to [the PSM coordinator] for a number, it was put in a green folder, and it was passed from desk to desk or mailbox to mailbox. It was a fairly long process. If you had questions, you’d have to go track down who had seen that MOC so far and ask them those questions. […] Oftentimes that would result in a do- loop. You’d ask them a question, they’d answer it, that would spar off another question. Now [after the incident], by having everybody just come and sit around a table and discuss the MOC at once, if I ask you a question and you answer it, everyone else around the table that may have the same question hears that answer. And they don’t ask the same question, but it may spur another question. So I think we have a lot of really good conversation by having that process in place. It also makes it a lot easier to have broader employee involvement, because every department has to be represented. Because by having everybody sit around the table and everybody look at the form and discuss it at once, the [MOC] process doesn’t take place in a vacuum. It’s very transparent and very open and a very collaborative process. And so you do have some level of hazard analysis that takes place right there at that MOC review team meeting. And if it looks like we’re getting to the point of actually conducting a semi-HAZOP, then we can say, no, let’s refer this now to a PHA and let’s do a full-blown HAZOP on [the proposed change]. But I definitely think you get a much better hazard review in that collaborative [MOC] process. The CCPS book Guidelines for the Management of Change for Process Safety also advises readers that the team- based MOC approach can be a more effective MOC approach for identifying the potential safety and health effects of a proposed change (Figure 24).67

67 Center for Chemical Process Safety (CCPS). Guidelines for the Management of Change for Process Safety; John Wiley & Sons, Inc.: Hoboken, New Jersey, 2008; p 157.

46 CSB · Williams Geismar Case Study

Following the incident, Williams Geismar identified methods to communicate the types of changes that require an MOC. Also, Williams personnel informed the CSB that workers have an increased focus in ensuring MOCs are complete before fieldwork begins. Williams began facilitating this verification by sending around a plant- wide email to communicate MOC approval. If implemented effectively, these cultural and procedural changes can strengthen process safety management at the Williams Geismar facility. The CSB recommends to Williams several processes to ensure that these positive changes continue (Sections 9.0 and 12.0). 8.3 IMPROVED PHA ACTION ITEM IMPLEMENTATION PROCESS Before the incident, the Williams Geismar PHA procedure did not specify a method to follow when the leadership team decided to reject a PHA recommendation or deviate from the proposed recommendation language. Identifying this gap after the incident, Williams Geismar updated the Geismar PHA procedure accordingly (Figure 25), requiring a more robust process when deviating from the proposed PHA recommendation.

FIGURE 24 CCPS book Guidelines for the Management of Change for Process Safety suggests a team-based review can benefit MOC processes by more effectively identifying and controlling important health and safety impacts. FIGURE 25 The Williams Geismar revised, post-incident PHA procedure now specifies a method the leadership team must follow to implement PHA recommendations differently than originally worded.

CSB · Williams Geismar Case Study 47

The post-incident procedure change highlighted in Figure 25 reflects good practice guidance presented in the CCPS book Guidelines for Process Safety Documentation:

Resolution [of PHA recommendations] is not synonymous with adoption; not all recommendations will eventually be implemented as originally proposed. Circumstances change, some recommendations may ultimately be seen to be inappropriate, or a better means of achieving the same results may become known. […] In any event, the method of final resolution of recommendations should be documented, either in the summary report, in an addendum to the report, or in a separate follow-up report. The rationale for not implementing the recommendation as originally proposed, as well as any alternative course of action intended to achieve the objective, should be clearly documented.68

This new procedure can aid management when implementing action items differently than originally recommended by the PHA team. Williams has also increased emphasis on verifying proper completion of PHA action items. Before the incident, simply communicating to the PSM Coordinator, who tracks action items, was sufficient to close an action. This practice led to the ineffective implementation of an action item to install car seals on both propylene fractionator reboilers, and it prevented Williams Geismar from identifying that an MOC was not conducted for the change. Now, more enhanced closure verification requirements associated with PHA action items—for example the MOC and PSSR documentation—link to the PHA action item tracking system. This approach can more effectively verify PSM element completion. Williams also developed a new field verification requirement to ensure accuracy of all P&IDs associated with each PHA before conducting the PHA.69 If effectively implemented, this practice can help to ensure accurate process safety information prior to conducting the PHA. 8.4 NEW DEFINITIONS FOR “STANDBY” AND “OUT-OF-SERVICE” EQUIPMENT Before the incident, the differences in definitions and pressure relief requirements for “standby” and “out-of- service” equipment likely were not fully understood by all Williams personnel. When Williams implemented the 2006 PHA action item to car seal open the reboiler shell-side valves, only the active reboiler outlet valve was car sealed open. Prior to the incident, some Williams personnel may have believed that standby equipment, such as the standby propylene fractionator reboiler, did not require overpressure protection because they perceived it as “out-of-service.” To clarify these definitions and prevent future misunderstandings, after the incident Williams Geismar developed definitions for the two categories. The company now emphasizes these definitions in training and in operating procedures to ensure standby equipment has adequate overpressure protection:

68 Center for Chemical Process Safety. Guidelines for Process Safety Documentation; American Institute of Chemical Engineers: New York, New York, 1995; pp 102-103. 69 Williams has not developed a procedure for this practice.

48 CSB · Williams Geismar Case Study

Standby Equipment is a term used to describe equipment available for active service with a minimum of interaction and under the control of the operations group [through] normal operating procedures. Pressure relief protection is required and is available without further interaction by operators. Out-of-Service Equipment is a term used for positive isolation of a piece of equipment from active service. This is accomplished when isolation is complete and the process fluids have been emptied. At this point relief protection is not needed. Williams more clearly specified pressure relief requirements for “Standby” and “Out-of-Service” equipment internally; however, the CSB found little industry guidance on the definitions and pressure relief requirements for the two categories of inactive equipment. API Standard 521, Pressure-relieving and Depressuring Systems is the applicable industry standard to provide guidance on pressure relief requirements for standby versus out-of-service equipment. The CSB found that this industry standard defined neither standby equipment nor out-of-service equipment. In addition, pressure relief requirements for these classifications of equipment are not explicitly stated. API can improve the clarity of overpressure protection requirements by defining these terms and stating whether overpressure protection is required for each classification. 8.5 IMPROVED TROUBLESHOOTING SUPPORT Since the incident, Williams Geismar improved information provided to operators during an event that may require troubleshooting, such as when a process alarm activates. Now, when board operators get an alarm on the distributed control system (DCS), they can right-click on the alarm and display troubleshooting guidance. The guidance includes directions on what to check in the field, what the field operators should look for, and the consequences of improper field actions. This information is also in the standard operating procedures, and operators receive training on this information. A Williams Geismar technical employee informed the CSB, “Although troubleshooting is still kind of beyond the standard operating procedure, I think [this new practice] gives us a more disciplined set of guidelines, and it gives the operators [better] access to that guidance.”

CSB · Williams Geismar Case Study 49

  1. 6 IMPROVED FOCUS ON LEADING AND LAGGING INDICATORS

In recent years, both industry and the CSB have published guidance and conducted forums emphasizing the importance of collecting and analyzing leading70 and lagging71 indicators (metrics) to help prevent process safety incidents.72 The CSB conducted a 2012 public hearing and issued a recommendation to API to develop a consensus standard defining performance indicators for process safety for use in the refining and petrochemical industry. (In response, API developed API RP 754, Process Safety Performance Indicators for the Refining and Petrochemical Industries.) The CCPS book Guidelines for Process Safety Metrics describes the purpose of process safety metrics succinctly: Process safety metrics are critical indicators for evaluating a process safety management system’s performance. More than one metric and more than one type of metric are needed to monitor performance of a process safety management system. A comprehensive process safety management system should contain a variety of metrics that monitor different dimensions of the system and the performance of all critical elements […]. Good process safety metrics will reinforce a process safety culture promoting a belief that process safety incidents are preventable, that improvement is continuous, and that policies and procedures are necessary and will be followed. Continuous improvement is necessary and any improvement program must be based on measureable elements. Therefore, to continuously improve performance, organizations must develop, implement, and review effective process safety metrics.73

70 Leading Indicators can help to predict future performance. API RP 754 provides leading indicator examples, including process hazard evaluations completion, process safety action item closure, training completed on schedule, procedures current and accurate, and MOC and PSSR compliance. See API Recommended Practice 754, 2nd ed. Process Safety Performance Indicators for the Refining and Petrochemical Industries, April 2016, Section 8.3. 71 Lagging Indicators are retrospective, based on incidents that have occurred. API RP 754 provides lagging indicator examples, including number of recordable injuries, loss of containment incidents, and pressure relief device discharge events. See API Recommended Practice 754, 2nd ed. Process Safety Performance Indicators for the Refining and Petrochemical Industries, April 2016, Section 5.2.2 and Section 6.2.2. 72 Publications and events include (1) CSB Public Hearing: Safety Performance Indicators, July 23-24, 2012, Houston, Texas, http://www.csb.gov/events/csb-public-hearing-safety-performance-indicators/ (accessed August 17, 2016); (2) U.S. Chemical Safety and Hazard Investigation Board, Refinery Explosion and Fire, BP Texas City, REPORT NO. 2005-04-I-TX, (March 2007); (3) API Recommended Practice 754, 1st ed., Process Safety Performance Indicators for the Refining and Petrochemical Industries, April 2010; (4) International Association of Oil & Gas Producers Recommended Practice, Process Safety - Recommended Practice on Key Performance Indicators, Report No. 456, November 2011; (5) Center for Chemical Process Safety (CCPS). Guidelines for Process Safety Metrics; John Wiley & Sons, Inc.: Hoboken, New Jersey, 2010; among others. 73 Center for Chemical Process Safety (CCPS). Guidelines for Process Safety Metrics; John Wiley & Sons, Inc.: Hoboken, New Jersey, 2010; p 30. KEY LESSON

“Good process safety metrics will reinforce a process safety culture promoting a belief that process safety incidents are preventable, that improvement is continuous, and that policies and procedures are necessary and will be followed.”i By measuring and analyzing process safety metrics, weaknesses in a company’s process safety management program can be identified. Finding these weaknesses and taking proactive steps to improve upon them can help to strengthen safety culture and prevent process safety incidents.

i. Center for Chemical Process Safety (CCPS). Guidelines for Process Safety Metrics; John Wiley & Sons, Inc.: Hoboken, New Jersey, 2010; p 30.

50 CSB · Williams Geismar Case Study

Williams Geismar did not effectively measure leading and lagging process safety indicators before the incident. Such a system could have identified the excessive time it was taking to implement PHA action items. For example, it took three and a half years to close the 2006 PHA action item to car seal open the propylene fractionator reboiler valves. Since the incident, Williams worked to develop a leading and lagging process safety metrics system. For example, Williams Geismar increased its focus on incident and near miss74 reporting, and these events are now valued as learning opportunities. Williams distributes incident and near miss reports to all facility leads, supervisors, engineers, and managers. In addition, the company now investigates high potential near miss incidents using a root cause methodology. Williams began performing statistical analyses on the incidents reported, and the trends and findings are distributed each month to Williams employees and senior managers (Figure 26). Williams also implemented electronic tools and databases to track PHA action items and preventive maintenance items— with the ability to report overdue items or upcoming due dates for action items to management. These efforts are just the beginning in the development of a robust leading and lagging process safety indicators program. CCPS developed example leading and lagging indicators that facilities can use in all areas of process safety management. Figure 27 shows an example list of indicators for Management of Change published by CCPS.75 Williams Geismar should expand its existing indicators program to ensure all facets of its process safety management systems, including MOC, PSSR, PHAs, and operating procedures, are effective.

74 CCPS defines a near miss incident as “The description of less severe incidents (i.e., below the threshold for inclusion in a lagging metric), or unsafe conditions that activated one or more layers of protection. Although these events are actual events (i.e., a “lagging” metric), they are generally considered to be a good indicator of conditions that could ultimately lead to a severe incident.” Center for Chemical Process Safety (CCPS). Guidelines for Process Safety Metrics; John Wiley & Sons, Inc.: Hoboken, New Jersey, 2010; p xvii. 75 Table from Center for Chemical Process Safety (CCPS). Guidelines for Process Safety Metrics; John Wiley & Sons, Inc.: Hoboken, New Jersey, 2010; p 152. FIGURE 26 Sample indicators report circulated to Williams Geismar management.

CSB · Williams Geismar Case Study 51

  1. 7

PROCESS SAFETY MANAGEMENT PROGRAM ASSESSMENTS Conducting in-depth assessments of a facility’s process safety management program is another way to proactively identify weaknesses in process safety programs including MOC, PSSR, PHA, and operating procedure programs. These assessments go beyond the requirements of the OSHA PSM Compliance Audit—which only requires basic compliance with the OSHA PSM regulation—to evaluate the quality of each process safety management program and the quality of implementation of those programs. Such an evaluation requires detailed analyses of historical process safety management documentation, including MOC and PSSR forms, PHA recommendations, PHA action item tracking systems, and written operating procedures. Process safety management program assessments that analyze a high percentage of historical process safety documentation can be used to identify systemic safety management program failures. The CSB found that process safety management program deficiencies spanning the 12 years leading to the incident were causal to the June 13, 2013 Williams Geismar reboiler rupture and fire. A robust process safety management program assessment—that analyzes years of historical process safety documentation—should be instituted by Williams to identify past safety management deficiencies that could cause future process safety incidents. To drive continual improvement, the CSB recommends to Williams Geismar to conduct such process safety program assessments at least once every three years. FIGURE 27 Example MOC indicators published in the CCPS book Guidelines for Process Safety Metrics

52 CSB · Williams Geismar Case Study

  1. 0 STRATEGIES FOR IMPROVING SAFETY CULTURE

A sequence of process safety management deficiencies resulting in unmitigated hazards often precedes serious process safety incidents such as the June 13, 2013 Williams Geismar incident. Additionally, incidents often initiate when existing system gaps coincide with actions at the front line, where workers may not recognize the underlying hazards. To prevent process incidents, organizations must develop a culture that promotes effective process safety management systems. In recent years, the chemical process industry has increasingly focused on process safety culture (“safety culture”). An organization’s safety culture is determined by the quality of its written safety management programs (e.g., process safety management procedures, including PHA, MOC, PSSR, operating procedures; written corporate policies) and the quality of implementing those programs by individuals in the organization, ranging from the CEO to the field operator. The Center for Chemical Process Safety has labeled these two facets as “Conduct of Operations” and “Operational Discipline,” respectively.76 In the years leading up to the incident, Williams Geismar exhibited characteristics of a weak process safety culture. The weaknesses below contributed to the June 13, 2013 incident, reflecting both deficiencies in and poor implementation of the existing process safety management system: (1) Williams did not perform the 2001 MOC until after the plant was operating with the valves installed, and the associated PSSR was incomplete. These actions did not comply with facility (and regulatory) safety management system requirements; however, Williams management accepted both of these practices; (2) Car seals are low-level, administrative controls, but they were the favored safeguard in the 2006 PHA recommendation to prevent overpressure events. Williams Geismar did not have a policy requiring the effectiveness of safeguards to be analyzed; (3) Williams Geismar did not follow OSHA PSM regulatory requirements that operations activities have an associated procedure to safely conduct the work. For example, Williams did not create a procedure specifically for switching the propylene fractionator reboilers Such a procedure should have alerted the operations personnel of the overpressure hazard;

76 Center for Chemical Process Safety (CCPS). Conduct of Operations and Operational Discipline—For Improving Process Safety in Industry; John Wiley & Sons, Inc.: Hoboken, New Jersey, 2011, pp 6-7. Improving an organization’s process safety culture starts with management. Managers can help to set a high bar for the organization’s commitment to implement effective safety management programs and company expectations (i.e., operational discipline) by:

Requiring the collection of key performance indicators for process safety and regularly reviewing them; Setting process safety performance expectations and providing the resources to achieve them; Looking for management system failures as root causes for incidents; Consistently identifying and correcting substandard actions or conditions during field walkthroughs; Completing management reviews and approvals related to work activities in a timely manner; Holding everyone (including themselves) accountable for commitments and ensuring that issues are resolved in a timely manner; Ensuring adequate staffing to operate units safely; and Ensuring adequate funding to maintain equipment and safety systems in good condition.

These are examples from the CCPS book Conduct of Operations and Operational Discipline—For Improving Process Safety in Industry, 2011, p 5.

Improving Process Safety Culture – Management’s Obligations

CSB · Williams Geismar Case Study 53

(4) The Williams PHA policy did not require effective action item resolution and verification, resulting in incorrect action item implementation in the field; (5) The Williams PHA policy did not require PHA teams to effectively evaluate and control risk; and (6) Operations personnel had informal authorization to manipulate field equipment as part of assessing process deviations without first conducting a hazard evaluation and developing a procedure. Lessons from the Williams Geismar incident have broad application to other organizations. The deficiencies listed above highlight that both a strong written safety management system and effective implementation of that system are required to have good process safety performance. Lessons to consider include: (1) Ensure company standards always meet or exceed regulations, industry codes and standards, and best practices; (2) Verify the facility complies with company standards and procedures through activities such as performing audits and tracking indicators; and (3) Assess and strengthen the organizational safety culture including the organization’s commitment to process safety.77 Item (3) above can be the most challenging to measure and to identify action items to improve performance. Areas to consider include: (1) Leaders create culture by what they pay attention to. Is management, from the top down, engaged in process safety? Do leaders require proof of safety rather than proof of danger? (2) Does the organization have a reporting culture? Is reporting of incidents, near misses, and unsafe conditions encouraged? Can personnel report such occurrences without fear of retaliation? Does the company / site proactively investigate worker safety concerns and implement timely and effective corrective actions? (3) Does the organization encourage a learning culture? Does it examine incidents outside of the organization? Does it apply relevant lessons broadly across the organization? (4) Are employees effectively involved in process safety decisions? Before making decisions, is there an open and collaborative process to evaluate problem areas?

77 “Process safety” refers to strategies to prevent chemical releases, fires, and explosions through process design and process safety management programs. KEY LESSON

It is essential to maintain a high level of vigilance when implementing process safety management programs. Only partially or ineffectively conducting elements of PSM programs such as MOCs, PSSRs, PHAs, safeguard evaluations, and procedure development programs can cause significant hazards to be overlooked, and this can lead to catastrophic incidents, sometimes years later.

54 CSB · Williams Geismar Case Study

(5) Are members of the organization overconfident, or do they maintain a healthy sense of vulnerability regarding safety? Are employees susceptible to normalization of deviance?78 In its book Guidelines for Risk Based Process Safety, the Center for Chemical Process Safety provides example methods a facility can employ to improve its process safety culture. These include: (1) Establish process safety as a core value; (2) Provide strong leadership [for process safety]; (3) Establish and enforce high standards of [process safety] performance; (4) Maintain a sense of vulnerability; (5) Empower individuals to successfully fulfill their process safety responsibilities; (6) Defer to expertise; (7) Ensure open and effective communications; (8) Establish a questioning / learning environment; (9) Foster mutual trust; (10) Provide timely response to process safety issues and concerns; and (11) Provide continuous monitoring of [process safety] performance.79 Another tool to evaluate a facility’s safety culture is the use of anonymous safety culture assessments of staff. These assessments have historically been conducted by surveying a site’s employees through multiple-choice questionnaires. Facilities may also use qualitative assessment practices that go beyond simple employee questionnaire surveys. Such safety culture assessments include personnel interviews, focus group discussions, and detailed document analyses. With qualitative assessments, workers interact with auditors, “using their own terms and concepts to express their point of view…. [I]ntensive and in-depth information can be obtained using the [workers’] own language.” 80

78 Normalization of deviance is the acceptance of events that are not supposed to happen. Objective outside observers view the given situation as abnormal or deviant, whereas those individuals on the inside become accustomed to it and view it as normal and acceptable. See Vaughan, Diane. Interview with ConsultingNewsLine, May 2008, http://www.consultingnewsline.com/Info/Vie%20du%20Conseil/Le%20Consultant%20du%20mois/Diane%20Vaughan%20%28 English%29.html (accessed August 17, 2016). 79 Center for Chemical Process Safety (CCPS). Guidelines for Risk Based Process Safety; John Wiley & Sons, Inc.: Hoboken, New Jersey, 2007; pp 39-66. 80 Wiegmann, Douglas A.; Zhang, Hui; von Thaden, Terry L.; Sharma, Gunjan; Gibbons, Alyssa Mitchell. Safety Culture: An Integrative Review. The International Journal of Aviation Psychology, 2004, Vol 14, No 2, pp 117-134.

CSB · Williams Geismar Case Study 55

Guidance published in recent years describes how to conduct safety culture assessments of chemical process facilities. In 2011, Contra Costa County in California published a guidance document on conducting safety culture assessments.81 Also in 2011, CCPS released the second edition of its book Guidelines for Auditing Process Safety Management Systems. Chapter four of this book provides detailed guidance for auditors evaluating an organization’s safety culture.82 Such safety culture assessments are an additional tool for understanding the overall commitment to process safety at a facility, and facilities can use findings from the assessment to develop action items to continually improve the facility’s approach to safety. The CSB recommends that Williams begin implementing a process safety culture continual improvement program—using safety culture assessments—as another tool to improve overall safety at its Geismar facility.

81 Contra Costa Health Services. Industrial Safety Ordinance Guidance Document, Section F-Safety Culture Assessments; June 15,

  1. http://cchealth.org/hazmat/iso/guidance.php (accessed August 17, 2016).

82 Center for Chemical Process Safety (CCPS). Guidelines for Auditing Process Safety Management Systems; John Wiley & Sons, Inc.: Hoboken, New Jersey, 2011; pp 181-211. “Achieving and sustaining a positive [safety] culture is not a discreet event, but a journey. Organisations should never let their guard down. Healthy safety cultures result in high reliability organisations which are characterized by their “chronic sense of unease”. Organisations must ensure that senior management are committed to a journey of continuous improvement.” International Association of Oil & Gas Producers, A Guide to Selecting Appropriate Tools to Improve HSE Culture, 2010.

56 CSB · Williams Geismar Case Study

  1. 0 KEY LESSONS

Overpressure protection is an essential safeguard for all pressure vessels. PHA teams must ensure that all pressure vessels have effective overpressure protection. At a minimum, a pressure relief device is a necessary safeguard to protect process equipment from overpressure scenarios where internal vessel pressure can exceed design code limits. 2. Closed gate (block) valves leak, and they are susceptible to inadvertent opening. Both scenarios can introduce process fluids to offline equipment. More robust isolation methods, such as inserting a blind, can better protect offline equipment from accumulation of process fluid. 3. It is important to ensure that the final implementation of PHA action items addresses the original safety concerns identified by the PHA team. Companies should ensure that action items have been effectively implemented and field verified before closing them out. 4. Robust Management of Change (MOC) practices are needed to ensure the review analyzes hazards in the entire process affected by the change. Similar to PHAs, conducting MOC reviews as a multidisciplinary group—composed of individuals with different experiences and different areas of expertise—can assist in identifying hazards introduced by a process change. Companies must conduct MOCs before implementing a change in the field, and should not treat them as a paperwork or check-the-box exercise. 5. Pre-Startup Safety Reviews (PSSRs) are key opportunities to verify effective implementation of design intent, accuracy of process safety information, and proper installation and configuration of field equipment. Companies should conduct thorough and effective PSSRs before placing equipment in service. 6. Operating procedures need sufficient detail to ensure effective performance of critical steps, including performing steps in the correct order. Affected employees such as operators must receive training on the procedures. Management must establish expectations to maintain and follow accurate procedures. 7. PHA and MOC teams should effectively use the hierarchy of controls to the greatest extent feasible when evaluating safeguards. Pressure relief devices are typically more robust safeguards than car seals. Pressure relief devices (active safeguards) are higher on the hierarchy of controls than car seals (administrative controls). 8. “Good process safety metrics will reinforce a process safety culture promoting a belief that process safety incidents are preventable, that improvement is continuous, and that policies and procedures are necessary and will be followed.”83 By measuring and analyzing process safety metrics, weaknesses in a company’s process safety management program can be identified. Finding these weaknesses and taking proactive steps to improve upon them can help to strengthen safety culture and prevent process safety incidents. 9. It is essential to maintain a high level of vigilance when implementing process safety management programs. Only partially or ineffectively conducting elements of PSM programs such as MOCs, PSSRs, PHAs, safeguard evaluations, and procedure development programs can cause significant hazards to be overlooked, and this can lead to catastrophic incidents, sometimes years later.

83 Center for Chemical Process Safety (CCPS). Guidelines for Process Safety Metrics; John Wiley & Sons, Inc.: Hoboken, New Jersey, 2010; p 30.

CSB · Williams Geismar Case Study 57

  1. 0 CONCLUSIONS

In the years leading up to the June 13, 2013 incident, significant weaknesses in the Williams Geismar process safety culture were evident in a series of deficiencies in implementing the site’s process safety management programs and in weaknesses in the written programs themselves. These deficiencies include a poorly conducted MOC and PSSR, ineffective safeguard selections and insufficient safeguard evaluation requirements, poor implementation of PHA action items, inadequate focus on developing and maintaining operating procedures, and allowing uncontrolled field equipment manipulations without first assessing the hazards and developing a procedure. Those deficiencies ultimately contributed to the reboiler rupture and the deaths of two employees. This incident highlights that maintaining process safety excellence at a facility requires consistent and organized effort by a company and its employees. Former CSB Chairperson John Bresland called on companies to strive for process safety excellence when he stated, “Operating hazard[ous] chemical plants need to have the highest level of chemical process safety possible to make sure they operate safely day in and day out. It requires constant diligence and constant attention to process safety management.”84 While Williams made safety improvements following the incident, the CSB has identified additional good practices Williams Geismar should implement for further improvement. These strategies, including conducting safety culture assessments, developing a robust indicators tracking program, and conducting detailed process safety program assessments, can aid in maintaining a consistent focus on process safety. The CSB also identified gaps in industry guidance provided by the American Petroleum Institute (API). Post- incident, API now requires relief devices for scenarios that generate pressure greater than what is allowed by the equipment design code; however, the CSB found the API guidance remains inconsistent, as API still specifies in some guidance that reliance on administrative controls is sufficient to prevent equipment from overpressuring. In addition, the CSB found limited guidance from API on definitions and pressure relief requirements for standby and out-of-service equipment. Further enhancing guidance in API publications can enable broader learning of the lessons from the Williams incident. Applying these lessons industry-wide can prevent future catastrophic incidents.

84 Walter, Laura; CSB Issues Urgent Safety Recommendations Following CITGO Refinery Accident. EHS Today [Online] 2009. http://ehstoday.com/safety/news/csb-issues-urgent-safety-recommendations-citgo-refinery-accident-1411 (accessed August 17, 2016).

58 CSB · Williams Geismar Case Study

  1. 0 RECOMMENDATIONS
  2. 1 WILLIAMS GEISMAR OLEFINS FACILITY

2013-03-I-LA-R1 Implement a continual improvement program to improve the process safety culture at the Williams Geismar Olefins Plant. Ensure oversight of this program by a committee of Williams personnel (“committee”) that, at a minimum, includes safety and health representative(s), Williams management representative(s), and operations and maintenance workforce representative(s). Ensure the continual improvement program contains the following elements: a. Process Safety Culture Assessments. Engage a process safety culture subject-matter expert, who is selected by the committee and is independent of the Geismar site, to administer a periodic process safety culture assessment that includes surveys of personnel, interviews with personnel, and document analysis. Consider the process safety culture audit guidance provided in Chapter 4 of the CCPS book Guidelines for Auditing Process Safety Management Systems as a starting point. Communicate the results of the Process Safety Culture Assessment in a report; and

b. Workforce Involvement. Engage the committee to (1) review and comment on the expert report developed from the Process Safety Culture Assessments, and (2) oversee the development and effective implementation of action items to address process safety culture issues identified in the Process Safety Culture Assessment report.

As a component of the process safety culture continual improvement program, include a focus on the facility’s ability to comply with its internal process safety management program requirements. Make the periodic process safety culture report available to the plant workforce. Conduct the process safety culture assessments at least once every five years. 2013-03-I-LA-R2 Develop and implement a permanent process safety metrics program that tracks leading and lagging process safety indicators. Consider available industry guidance, such as the guidance presented in the Center for Chemical Process Safety (CCPS) book Guidelines for Process Safety Metrics and the example metrics provided in the book’s accompanying CD. Design this metrics program to measure the effectiveness of the Williams Geismar Olefins Facility’s process safety management programs. Include the following components in this program: a. Measure the effectiveness of the Williams Geismar Management of Change (MOC) program, including evaluating whether MOCs were performed for all applicable changes, the quality of MOC review, and the completeness of the MOC review; b. Measure the effectiveness of the Williams Geismar Pre-Startup Safety Review (PSSR) program, including the quality of the PSSR review and the completeness of the PSSR review;

CSB · Williams Geismar Case Study 59

c. Measure the effectiveness of the Williams Geismar methods to effectively and timely complete action items developed as a result of Process Hazard Analyses (PHAs), Management of Change (MOC), incident investigations, audits, and safety culture assessments; and d. Measure the effectiveness of the Williams Geismar development and implementation of operating procedures.

Develop a system to drive continual process safety performance improvements based upon the data identified and analysis developed as a result of implementing the permanent process safety metrics program.

2013-03-I-LA-R3

Develop and implement a program that demands robust and comprehensive assessments of the process safety programs at the Williams Geismar facility, at a minimum including Management of Change, Pre- Startup Safety Review, Process Hazard Analyses, and Operating Procedures. Ensure that the assessments thoroughly evaluate the effectiveness of these important safety programs. To drive continual improvement of process safety programs to meet good practice guidance, ensure these assessments result in the development and implementation of robust action items that address identified weaknesses. Engage an expert independent of the Geismar site to lead these assessments at least once every three years.

  1. 2 AMERICAN PETROLEUM INSTITUTE

2013-03-I-LA-R4 To help prevent future major incidents such as a rupture of a pressure vessel in a special operating status, strengthen API Standard 521, Pressure-relieving and Depressuring Systems, by defining the various types of equipment operating statuses. Include definitions for “standby” and “out-of-service.” Specify pressure relief requirements for each type of equipment operating status. 2013-03-I-LA-R5 To help prevent future major incidents such as pressure vessel rupture from ineffective or failed administrative controls, clarify API Standard 521, Pressure-relieving and Depressuring Systems, to require a pressure relief device for overpressure scenarios where internal vessel pressure can exceed what is allowed by the design code. Although some portions of API Standard 521 already require a pressure relief device for these scenarios, other areas, such as Section 4.4.12 Hydraulic Expansion, are not as protective. Section 4.4.12 Hydraulic Expansion (the failure mode that caused the Williams overpressure incident) permits omitting a pressure relief device and allows the exclusive use of administrative controls.

60 CSB · Williams Geismar Case Study

REFERENCES 29 CFR §1910.119 Process Safety Management of Highly Hazardous Chemicals. 40 CFR Chapter 1, Subchapter C, Part 68 – Chemical Accident Prevention Provisions. American Society of Mechanical Engineers. ASME Boiler and Pressure Vessel Code, 2015. Section VIII, Division 1. API Recommended Practice 754, 2nd ed. Process Safety Performance Indicators for the Refining and Petrochemical Industries, April 2016. API Recommended Practice 572, 3rd ed., Inspection Practices for Pressure Vessels, November 2009. API Standard 521, 5th Edition. Pressure-relieving and Depressuring Systems, January 2007. API Standard 521, 6th Edition. Pressure-relieving and Depressuring Systems, January 2014. API Standard 598, 9th ed. Valve Inspection and Testing, September 2009. Birk, A.M.; Davison, C.; Cunningham, M.; Blast Overpressures from Medium Scale BLEVE Tests. Journal of Loss Prevention in the Process Industries, 2007, vol. 20, pp 194-206. Birk, A.M.; VanderSteen, J.D.J.; Davison, C.; Cunningham, M.H.; Mirzazadeh, I.; PRV Field Trials – The Effects of Fire Conditions and PRV Blowdown on Propane Tank Survivability in a Fire, TP 14045E, Transport Canada, 2003. Center for Chemical Process Safety (CCPS). A Practical Approach to Hazard Identification for Operations and Maintenance Workers; John Wiley & Sons, Inc.: Hoboken, New Jersey, 2010. Center for Chemical Process Safety (CCPS). Guidelines for Auditing Process Safety Management Systems; John Wiley & Sons, Inc.: Hoboken, New Jersey, 2011. Center for Chemical Process Safety (CCPS). Guidelines for Enabling Conditions and Conditional Modifiers in Layer of Protection Analysis; John Wiley & Sons, Inc.: Hoboken, New Jersey, 2014. Center for Chemical Process Safety (CCPS). Guidelines for Engineering Design for Process Safety, 2nd ed.; American Institute of Chemical Engineers: New York, New York, 2012. Center for Chemical Process Safety (CCPS). Guidelines for Hazard Evaluation Procedures, 3rd ed.; John Wiley & Sons, Inc.: Hoboken, New Jersey, 2008. Center for Chemical Process Safety (CCPS). Guidelines for Initiating Events and Independent Protection Layers in Layer of Protection Analysis; John Wiley & Sons, Inc.: Hoboken, New Jersey, 2015.

CSB · Williams Geismar Case Study 61

Center for Chemical Process Safety (CCPS). Guidelines for Management of Change for Process Safety; John Wiley & Sons, Inc.: Hoboken, New Jersey, 2008. Center for Chemical Process Safety (CCPS). Guidelines for Process Safety Metrics; John Wiley & Sons, Inc.: Hoboken, New Jersey, 2010. Center for Chemical Process Safety (CCPS). Guidelines for Risk Based Process Safety; John Wiley & Sons, Inc.: Hoboken, New Jersey, 2007. Center for Chemical Process Safety (CCPS). Guidelines for Writing Effective Operating and Maintenance Procedures; American Institute of Chemical Engineers: New York, New York, 1996. Center for Chemical Process Safety (CCPS). Inherently Safer Chemical Processes – A Life Cycle Approach. 2nd ed.; John Wiley & Sons, Inc.: Hoboken, New Jersey, 2009. Center for Chemical Process Safety (CCPS). Recognizing Catastrophic Incident Warning Signs in the Process Industries; John Wiley & Sons, Inc.: Hoboken, New Jersey, 2012. Center for Chemical Process Safety (CCPS). Conduct of Operations and Operational Discipline—For Improving Process Safety in Industry; John Wiley & Sons, Inc.: Hoboken, New Jersey, 2011. Center for Chemical Process Safety (CCPS). Guidelines for Vapor Cloud Explosion, Pressure Vessel Burst, BLEVE and Flash Fire Hazards, 2nd ed.; John Wiley & Sons, Inc.: Hoboken, New Jersey, 2010. Center for Chemical Process Safety (CCPS). Layer of Protection Analysis – Simplified Process Risk Assessment; American Institute of Chemical Engineers: New York, New York, 2001. Center for Chemical Process Safety. Guidelines for Process Safety Documentation; American Institute of Chemical Engineers: New York, New York, 1995. Chemical Safety Board Public Hearing: Safety Performance Indicators, July 23-24, 2012, Houston, Texas, http://www.csb.gov/events/csb-public-hearing-safety-performance-indicators/ (Accessed August 17, 2016). Chemical Safety Board Website. BP America Refinery Explosion. http://www.csb.gov/bp-america- refinery-explosion/ (Accessed August 17, 2016). Chemical Safety Board Website. Heat exchanger rupture and ammonia release in Houston, Texas. http://www.csb.gov/goodyear-heat-exchanger-rupture/ (Accessed August 17, 2016). Contra Costa Health Services. Industrial Safety Ordinance Guidance Document, Section F-Safety Culture Assessments; June 15, 2011. http://cchealth.org/hazmat/iso/guidance.php (accessed August 17, 2016). Frank, Walter L. and Whittle, David K. Revalidating Process Hazard Analyses. American Institute of Chemical Engineers: New York, New York, 2001.

62 CSB · Williams Geismar Case Study

Health and Safety Executive (HSE), Reducing Error and Influencing Behaviour, 2009. http://www.hse.gov.uk/pubns/priced/hsg48.pdf (accessed September 7, 2016). International Association of Oil & Gas Producers, A Guide to Selecting Appropriate Tools to Improve HSE Culture, Report No. 435, March 2010. International Association of Oil & Gas Producers, Process Safety - Recommended Practice on Key Performance Indicators, Report No. 456, November 2011. Kletz, Trevor. What Went Wrong? – Case Histories of Process Plant Disasters and How They Could Have Been Avoided, 5th ed.; Elsevier: Burlington, Massachusetts, 2009. The National Board of Boiler and Pressure Vessel Inspectors. National Board Inspection Code, 2015. Part 1-Installation. Queen’s University Website. Recent Fire Testing and BLEVE Research at Queen’s University. http://me.queensu.ca/People/Birk/Research/ThermalHazards/bleve/FieldTrials2000-2002.html (accessed August 17, 2016). Total Lockout Website. Car Seals. http://www.totallockout.com/online-store/car-seals-2/ (accessed November 19, 2015). U.S. Chemical Safety and Hazard Investigation Board, Catastrophic Rupture of Heat Exchanger (Seven Fatalities), Tesoro Anacortes Refinery; Anacortes, Washington; April 2, 2010. Report 2010-08-I-WA, May 2014. http://www.csb.gov/tesoro-refinery-fatal-explosion-and-fire/ (accessed August 17, 2016). Vaughan, Diane. Interview with ConsultingNewsLine, May 2008, http://www.consultingnewsline.com/Info/Vie%20du%20Conseil/Le%20Consultant%20du%20mois/Dian e%20Vaughan%20%28English%29.html (accessed August 17, 2016). Walter, Laura; CSB Issues Urgent Safety Recommendations Following CITGO Refinery Accident. EHS Today [Online] 2009. http://ehstoday.com/safety/news/csb-issues-urgent-safety-recommendations-citgo- refinery-accident-1411 (accessed August 17, 2016). Wiegmann, Douglas A.; Zhang, Hui; von Thaden, Terry L.; Sharma, Gunjan; Gibbons, Alyssa Mitchell. Safety Culture: An Integrative Review. The International Journal of Aviation Psychology, 2004, Vol 14, No 2. Williams Company Website. https://co.williams.com/operations/ngl-petchem/olefins/ (accessed August 17, 2016).

Appendix A Causal Analysis - AcciMap CSB · Williams Geismar Case Study 63

Appendix B – Failure Scenario Analysis

64 CSB · Williams Geismar Case Study

CSB ANALYSIS OF LIKELY REBOILER FAILURE SCENARIO

Williams Geismar, LA Investigation

Incident Date: June 13, 2013

Appendix B – Failure Scenario Analysis

CSB · Williams Geismar Case Study 65

Table of Contents

  1. 0 Summary ……………………………………………………………………………………………………..66
  2. 0 Failure Scenarios Evaluated ……………………………………..………………………………………….66
  3. 1 Overpressurization Due to Equilibrium Vapor Pressure at Quench Water Feed Temperature ……….………67
  4. 2 Explosion Due to High Concentrations of Methyl Acetylene and Propadiene ……………………………….68
  5. 3 Overpressurization Due to Liquid Thermal Expansion………………………………………………………..69
  6. 0 Boiling Liquid Expanding Vapor Explosion (BLEVE)………………………………………………...…..72

Appendix B – Failure Scenario Analysis

66 CSB · Williams Geismar Case Study

  1. 0 SUMMARY

On June 13, 2013, a propylene fractionator reboiler (Reboiler B) catastrophically ruptured, resulting in the fatalities of two Williams employees. The reboiler had been offline, isolated from the propylene fractionator by a single valve on the inlet piping and a single valve on the outlet piping, when hot water was introduced to the tube side of the exchanger while the shell-side valves were still closed. Approximately three minutes after the tube- side hot water valves were opened, the reboiler ruptured. Post-incident analysis indicates the reboiler shell likely failed at an internal pressure estimated to be between 674 and 1,212 psig.85 The CSB determined that a pressure of this magnitude was likely generated by liquid thermal expansion in the liquid-filled, Reboiler B shell. The process liquid within the shell, which contained mostly propane with smaller amounts of propylene and C4 hydrocarbons, such as butane, likely entered the offline Reboiler B shell during the 16 months it was isolated from the process by at least one of the following: (1) a leaking process valve; (2) a mistakenly opened process valve; or, (3) another reason not identified. This report details the possible failure scenarios for the reboiler shell, which the CSB evaluated.

  1. 0 FAILURE SCENARIOS EVALUATED

The following sections detail the CSB’s analysis of possible propylene fractionator reboiler (Reboiler B) failure scenarios. These include overpressurization due to an increase in the equilibrium vapor pressure as the reboiler temperature increased, detonation due to an accumulation of methyl acetylene and propadiene (MAPD), and vessel rupture due to liquid thermal expansion.

85 See Metallurgical Evaluation of Williams Olefins Ruptured Reboiler EA-425B in Appendix C.

Appendix B – Failure Scenario Analysis

CSB · Williams Geismar Case Study 67

  1. 1 OVERPRESSURIZATION DUE TO EQUILIBRIUM VAPOR PRESSURE AT QUENCH

WATER FEED TEMPERATURE

The tube-side quench water was at a temperature of 187 °F. At equilibrium conditions at 187 °F, the shell-side propane mixture generates a vapor pressure of approximately 496 psig (Figure B-1). This pressure is not high enough to have ruptured the reboiler, which Finite Element Analysis predicts ruptured between 674 and 1,212 psig.86 The CSB concludes that the overpressurization of the Williams reboiler was likely not caused by an increase in vapor-liquid equilibrium pressure when heat was introduced to the closed shell side of the reboiler.

86 See Metallurgical Evaluation of Williams Olefins Ruptured Reboiler EA-425B in Appendix C. FIGURE B-1 Boiling Point Curve of Williams reboiler process fluid. Graph indicates process fluid could generate a vapor pressure of 496 psig at equilibrium conditions.

Appendix B – Failure Scenario Analysis

68 CSB · Williams Geismar Case Study

  1. 2 EXPLOSION DUE TO HIGH CONCENTRATIONS OF METHYL ACETYLENE AND

PROPADIENE Mixtures of methyl acetylene and propadiene (MAPD) can decompose and ignite without the presence of oxygen, resulting in an explosion inside of equipment that can violently rupture process vessels. Heat input to the mixture could be sufficient to initiate the ignition of the materials.87 Experimental studies have found that hydrocarbon mixtures containing approximately 60 mol% MAPD can sufficiently decompose and propagate a flame.88 The CSB analyzed whether the decomposition and ignition of MAPD in the reboiler shell caused this incident. Williams regularly sampled the MAPD composition exiting the propadiene converter, which was immediately upstream of the propylene fractionator (Figure B-2). The propadiene converter was installed into the process specifically to prevent accumulation of MAPD in the process. Plant data indicates the propadiene converter was functioning normally between a February 2012 maintenance activity and the day of the incident. Between the time Reboiler B was last opened for maintenance (February 2012) and the incident, available composition data indicates that the process fluid entering the propylene fractionator did not exceed approximately 1.4 mol% MAPD. This concentration likely was not enough to accumulate a high percentage of MAPD in the standby reboiler, which was isolated from the propylene fractionator by closed valves. In a 2013 presentation by Dow at the AIChE Ethylene Producers’ Conference, two scenarios were identified that could result in accumulation of MAPD in a propylene fractionator: operating on total reflux or operating with a loss of bottoms flow.89 The propylene fractionator was not operated under either condition between February 2012 and the incident. The CSB concludes that this incident was likely not caused by the accumulation and detonation of MAPD in the offline Reboiler B.

87 Kuchta, J.M.; Spolan, I.; Zabetakis, M.G. Flammability Characteristics of Methylacetylene, Propadiene (Allene), and Propylene Mixtures. Journal of Chemical and Engineering Data, 1964, Vol. 9, No. 3, 467-472. 88 Yoshimine, M.; Kern, W.G.; Belfit, R.W. Stabilization of Methylacetylene and Propadiene Mixtures. Journal of Chemical and Engineering Data, 1967, Vol. 12, No. 3, 399-405. 89 Feld, Peter; MAPD Stability and Management in Ethylene Plants, 2013 AIChE Spring National Meeting; San Antonio, Texas; May 1, 2013; AIChE Paper Number 111b. FIGURE B-2 Simplified flow diagram of the olefins process. The propadiene converter and the propylene fractionator are highlighted in yellow.

Appendix B – Failure Scenario Analysis

CSB · Williams Geismar Case Study 69

  1. 3

OVERPRESSURIZATION DUE TO LIQUID THERMAL EXPANSION Liquid expands as it is heated and has the ability to generate high pressures when the liquid is confined within a closed vessel. Based on equipment dimensions and the physical properties of the design composition of the propylene fractionator bottoms product, the CSB calculated the minimum quantity of process liquid required at ambient temperature (approx. 77 °F) to completely fill the propylene fractionator Reboiler B at the quench water temperature (187 °F). The following calculations were performed to determine the approximate quantity of liquid process fluid required on the shell side of the Williams reboiler and in connected piping to result in a liquid overpressurization of the reboiler shell. Total Volume Available Between Closed Valves 𝑉𝑉𝑡𝑡𝑡𝑡𝑡𝑡𝑡𝑡𝑡𝑡= 289.93 𝑓𝑓𝑓𝑓3

Volume of Process Fluid Required to Fill Exchanger Shell at Quench Water Feed Temperature Williams Propylene Fractionator Bottoms Design Case: Component Flow Rate (lbmol/hr) Propylene 8.327 Propane 235.921 C4’s 2.831

The density of this liquid was evaluated at two conditions using Aspen HYSYS, SRK equation of state: (1) Ambient temperature (77°F): 𝜌𝜌𝑙𝑙,77°𝐹𝐹= 30.89 𝑙𝑙𝑙𝑙𝑚𝑚 𝑓𝑓𝑓𝑓3 (2) Quench water inlet temperature (187°F): 𝜌𝜌𝑙𝑙,187°𝐹𝐹= 20.22 𝑙𝑙𝑙𝑙𝑚𝑚 𝑓𝑓𝑓𝑓3 Mass of liquid required to fill shell side volume at 187°F: 𝑚𝑚𝑙𝑙= (𝑉𝑉𝑡𝑡𝑡𝑡𝑡𝑡𝑡𝑡𝑡𝑡)൫𝜌𝜌𝑙𝑙,187°𝐹𝐹൯= (289.93 𝑓𝑓𝑓𝑓3)൬20.22 𝑙𝑙𝑙𝑙𝑚𝑚 𝑓𝑓𝑓𝑓3൰= 5,862.38 𝑙𝑙𝑙𝑙𝑚𝑚 Volume this mass occupies at 77°F: 𝑉𝑉𝑙𝑙,77°𝐹𝐹= 𝑚𝑚𝑙𝑙 𝜌𝜌𝑙𝑙,77°𝐹𝐹 = 5,862.38 𝑙𝑙𝑙𝑙𝑚𝑚 30.89 𝑙𝑙𝑙𝑙𝑚𝑚 𝑓𝑓𝑓𝑓3 = 189.78 𝑓𝑓𝑓𝑓3 Percentage total volume occupied at 77°F: 189.78 𝑓𝑓𝑓𝑓3 289.93 𝑓𝑓𝑓𝑓3 𝑥𝑥 100 = 65.5 𝑣𝑣𝑣𝑣𝑣𝑣% The piping and exchanger shell between the two closed reboiler process valves had to be at least 65.5 vol% full of the liquid propane mixture prior to the introduction of hot quench water to the tube side of the reboiler for liquid expansion to result in overpressurization of the exchanger shell and piping. A liquid inventory of at least this

Appendix B – Failure Scenario Analysis

70 CSB · Williams Geismar Case Study

minimum quantity of liquid is reasonable because (1) it would have resulted in a level in the reboiler below the liquid level in the propylene fractionator, and (2) this quantity of liquid would have had enough contact with the reboiler tubes to sufficiently heat and expand (Figure B-3). Reboiler B was likely between 65.5 vol% and 100 vol% full of the liquid propane mixture prior to the introduction of the 187 °F quench water.

FIGURE B-3 Depiction of minimum required liquid level in reboiler EA-425B (Reboiler B) to result in possible liquid overpressurization of reboiler shell.

Appendix B – Failure Scenario Analysis

CSB · Williams Geismar Case Study 71

Pressure Rise Due to Liquid Thermal Expansion The following equation was used to calculate the theoretical pressure that could be reached inside the Reboiler B shell due to liquid thermal expansion of the propane mixture. The calculation assumed that the reboiler was initially full of the liquid propane mixture. Assuming negligible leakage across the shell-side valves during the three minutes between the introduction of hot quench water and vessel failure:90 𝑃𝑃2 = 𝑃𝑃1 +

(𝑇𝑇2 −𝑇𝑇1)(𝛼𝛼𝑣𝑣−3𝛼𝛼|) 𝜒𝜒+ ൬ 𝑑𝑑 2𝐸𝐸𝛿𝛿𝑤𝑤൰(2.5 −2𝜇𝜇)

Where 𝑃𝑃2 is the final gauge pressure of blocked-in, liquid-full equipment, expressed in psig; 𝑃𝑃1 is the initial gauge pressure of blocked-in, liquid-full equipment, expressed in psig; 𝑇𝑇2 is the final temperature of blocked-in, liquid-full equipment, expressed in °F; 𝑇𝑇1 is the initial temperature of blocked-in, liquid-full equipment, expressed in °F; 𝛼𝛼𝑣𝑣 is the cubic expansion coefficient of the liquid, expressed in 1/°F;

𝛼𝛼| is the linear expansion coefficient of metal wall, expressed in 1/°F; 𝜒𝜒 is the isothermal compressibility coefficient of the liquid, express in 1/psi; 𝑑𝑑 is the internal pipe diameter, expressed in inches; 𝐸𝐸 is the modulus of elasticity for the metal wall at 𝑇𝑇2, expressed in psi; 𝛿𝛿𝑤𝑤 is the metal wall thickness, expressed in inches; 𝜇𝜇 is Poisson’s ratio, typically 0.3.

This calculation finds that the pressure inside of the Reboiler B shell could reach approximately 5,000 psig due to liquid thermal expansion of the propane mixture within the confined shell. Finite element analysis predicted the reboiler failed at an internal pressure between 674 and 1,212 psig.91 The pressure generated by liquid thermal expansion would be sufficient to achieve this failure pressure. The CSB concludes that liquid thermal expansion of the liquid-filled Reboiler B shell was the likely failure scenario that initiated the mechanical failure sequence resulting in the boiling liquid expanding vapor explosion (BLEVE).

90 Equation from API Standard 521, 6th ed. Pressure-relieving and Depressuring Systems, January 2014, section 4.4.12.4.1. 91 See Metallurgical Evaluation of Williams Olefins Ruptured Reboiler EA-425B in Appendix C.

Appendix B – Failure Scenario Analysis

72 CSB · Williams Geismar Case Study

  1. 0 BOILING LIQUID EXPANDING VAPOR EXPLOSION (BLEVE)

When the reboiler shell failed locally (cracked) due to liquid thermal expansion of the shell contents, the shell contents began to flash near the failure opening and a two-phase (liquid and vapor) jet release would have accelerated out of the failure opening. The two-phase flow would have choked in the failure opening, maintaining the pressure in the vessel for a short period of time. The pressure loading on the open edges of the failure caused the crack to continue to grow along the vessel length and the failure opening rapidly increased in size. As this opening increased in size, the two-phase jet would have grown rapidly. At some point, the full opening of the vessel would have resulted in an explosive release of the remaining vessel contents. This explosive release is called a boiling liquid expanding vapor explosion (BLEVE).92 The pressure forces during this process usually flatten the vessel cylinder on the ground (Figure B-4). The escaping propane mixture then found an ignition source and ignited.

92 Center for Chemical Process Safety (CCPS). Guidelines for Vapor Cloud Explosion, Pressure Vessel Burst, BLEVE and Flash Fire Hazards, 2nd ed.; John Wiley & Sons, Inc.: Hoboken, New Jersey, 2010; p 311. FIGURE B-4 Post-incident photo of Reboiler B shell. The originally cylindrical shell was flattened during the event.

Appendix C – Metallurgical Analysis Report

CSB · Williams Geismar Case Study 73

Appendix C – Metallurgical Analysis Report

The Metallurgical Analysis Report is on the CSB website on the Williams Olefins Plant Explosion and Fire investigation page.

74 CSB · Williams Geismar Case Study

Members of the U.S. Chemical Safety and Hazard Investigation Board:

Vanessa Allen Sutherland, J.D. Chairperson

Manuel Ehrlich Member

Richard Engler Member

Kristen Kulinowski, Ph.D. Member

FD06462 | 2013_美国_carbide-industries-fire-explosion.pdf

分类:06_境外及港澳台调查报告 | 年份:2013 | 地域: | 严重程度: | 场所: | 起火原因: | 来源格式:pdf

CSB • Carbide Industries Case Study 1 Carbide Industries Case Study Board Voting Copy February 2013 Case Study U.S. Chemical Safety and Hazard Investigation Board Carbide Industries, LLC, Louisville, KY Electric Arc Furnace Explosion March 21, 2011 2 Killed, 2 Injured No. 2011-05-I-KY On March 21, 2011, during calcium carbide production at the Carbide Industries plant in Louisville, KY, an electric arc furnace exploded, ejecting solid and powdered debris, flammable gases, and molten calcium carbide at temperatures near 3800°F (2100°C). Two workers died and two others were injured.

KEY ISSUES • Facility Siting • Normalization of Deviance • Consensus Standards INSIDE • Process Discussion • Incident Description • Emergency Response • Analysis • Key Findings • Recommendations

CSB • Carbide Industries Case Study 2 Carbide Industries Case Study Board Voting Copy February 2013 1.0 INTRODUCTION Two workers were killed and two were injured at the Carbide Industries, LLC facility in Louisville, KY, on Monday, March 21, 2011, when an electric arc furnace (EAF) overpres­ sured and emitted powdered debris, hot gases, and molten calcium carbide. The hot gases and debris blown from the furnace broke through the double-pane reinforced glass window of the control room, severely burning the two workers inside; they died within 24 hours from burn injuries. Carbide Industries, LLC is the larger of two North American producers of calcium carbide and supplies calcium carbide primarily to the iron and steel industry and to acetylene1 producers. The main Carbide Industries facility is adjacent to the Ohio River in the “Rubbertown” section of western Louisville, KY. The company employs about 160 workers in operations, maintenance, and administration. The Louisville site operated one 50-mega­ watt (MW) EAF with the capacity to produce 120,000 tons of molten calcium carbide per year. After draining the calcium carbide from the EAF and cooling it to a solid, the site grinds and packages the solid into multiple grades of calcium carbide for sale. Although the facility maintains an acetylene storage tank to collect fugitive acetylene gas from the calcium carbide plant, the operation does not produce acetylene gas to sell.2 TABLE OF CONTENTS 1.0 Introduction 2 2.0 Process Discussion 3 3.0 Emergency Planning

and Response 6 4.0 Incident Description 7 5.0 Analysis 8 6.0 Key Findings 13 7.0 Recommendations 14 8.0 References 15 9.0 Appendix A: Simplified

Diagram of Calcium

Carbide process 16

FIGURE 1 Satellite view of the Carbide Industries Louisville facility, with furnace building circled 1Adding water to calcium carbide produces acetylene gas and calcium hydroxide (lime). The acetylene gas is then purified to sell as welding gas and raw material for producing other chemicals. 2Carbide Industries burns the collected acetylene gas in a flare.

CSB • Carbide Industries Case Study 3 Carbide Industries Case Study Board Voting Copy February 2013 3According to the EPA, in 1999, there were 200 EAFs operated in US industry, 130 of which were used for steelmaking. 4Coke, a solid carbon that contains some hydrogen, is a black solid produced by high-temperature processing of high boiling petroleum- or coal-based process streams and residues in an oxygen-free environment. Only a few calcium carbide industry facilities operate in the United States. In addition to the Carbide Industries facility in Kentucky, Central Carbide Corporation in Pryor, OK, operates a 17-MW electric arc furnace. Central Carbide Corporation is under the same ownership as Carbide Industries, LLC. Although the majority of EAFs used in the U.S. are for steel manufacturing,3 similar chemical producing operations use EAFs in the ferrosilicon, silicon, and phosphorus industries. 2.0 PROCESS DISCUSSION 2.1. CHEMICAL PROPERTIES OF CALCIUM CARBIDE Pure calcium carbide (chemical formula CaC2) consists of two carbon atoms and one calcium atom; it melts at about 3500°F (1926°C). At room temperature, commercially produced calcium carbide is a gray to black solid that is typically supplied as granules or powder con­ taining about 75 to 85 weight percent calcium carbide with 15 to 25 weight percent calcium oxide and other impurities. Calcium carbide reacts with water, such as the humidity in air or the moisture in human tissues, to form acetylene gas (chemical formula C2H2) and calcium hydroxide (chemical formula Ca(OH)2). Acetylene is an extremely flammable gas. Calcium hydroxide is a caustic solid that can irritate the skin and eyes on contact and can lead to severe respiratory irritation and acute pulmonary edema when inhaled. 2.2. ELECTRIC ARC FURNACES FOR CALCIUM CARBIDE An EAF passes electricity through the air above a material to heat that material (indirect arc furnaces) and in some designs through the material as well (open arc and submerged arc furnaces). The electricity enters the EAF through large conductors called electrodes. Calcium carbide is manufactured in submerged arc EAFs through which electrodes protrude into the material to be heated. Radiative heating occurs from the arc in the air around the material, direct electrical resistance heating occurs as the electricity passes through the material, and convective heating occurs as the hot gases formed in the arc percolate through the material. EAFs can generate temperatures in the thousands of degrees centigrade. The calcium carbide process feeds coke4 pre-mixed with lime chunks (calcium oxide, (CaO)) to the EAF, and the electrodes protrude through the furnace cover into the pile of coke and lime. As the EAF provides electricity, heating the feed material to temperatures above 4100°F, the carbon in the coke reacts with the lime at high temperature to form liquid calcium carbide as a product and the toxic and flammable by-product carbon monoxide: CaO + 3C ∆→ CaC2 + CO Lime + carbon + heat → calcium carbide + carbon monoxide Since the coke contains some hydrogen atoms, the process also releases extremely flammable hydrogen gas (H2).

CSB • Carbide Industries Case Study 4 Carbide Industries Case Study Board Voting Copy February 2013 2.3 EQUIPMENT DESCRIPTION The EAF at Carbide Industries was located on the ground floor of the five-story furnace building (Figure 2). Due to the height of the furnace itself, the cover of the furnace was at the second floor level; the same level as the control room where the furnace operator controlled the chemical and electrical feeds to the furnace. The control room had a window made of dual-paned, one-half-inch thick, wire-reinforced glass. Figure 3 shows that the control room window was about 12 feet from the furnace cover. The furnace was a refractory-lined metal tank with three holes in the sidewall to drain the molten calcium carbide product. These three-hole positions were at the elevation of the mezzanine level, between the second and ground floor. The furnace cover was about four feet tall and made of refractory-lined metal that was water cooled. The refractory prevented the high-temperature materials in the furnace from contacting and melting the metal tank and cover. The furnace cover was fabricated in several sections and bolted together. Cooling water flowed through each hollow section as additional protection against overheating. Three electrodes protruded through the furnace cover. The electrodes extended from the fifth floor down to just below the second floor. Three transformers on the third floor supplied AC power to the electrodes. FIGURE 2 Cutaway view of the EAF building and location of victims at time of incident Location of victims

CSB • Carbide Industries Case Study 5 Carbide Industries Case Study Board Voting Copy February 2013 Tanks on the fourth level held pre-mixed feed until a conveyor system dispensed the material into chutes that distributed the feed around the furnace electrodes. The feed material flowed down into the furnace through the gaps between the electrode sheaths and the holes that the electrodes passed through in the furnace cover. 2.4. PROCESS DESCRIPTION The plant receives truck and rail deliveries of coke and lime respectively (Appendix A). An oven dries the coke and a weighing system mixes the coke with the lime in the desired weight ratio to feed the furnace. A system of tanks and chutes distributes the solid feed mixture (coke and lime) through the EAF cover and around the three electrodes. The furnace contains hot feed material, liquid calcium carbide, and flammable and toxic gases that are byproducts of the EAF, including hydrogen and carbon monoxide. The feed material falls through the feed chutes into the furnace and floats on the surface of the liquid calcium carbide, forming deep piles around each electrode. The furnace runs under slight pressure to prevent air from being drawn into the furnace and igniting the flammable gases. The gases produced in the furnace exit primarily through a vent system to a wet scrubber, a device that removes pollutants from gas through contact with liquid. Some of the gas exits into the second floor of the furnace building through the gaps between the electrode sheaths and the holes that the electrodes pass through in the furnace cover. In addition to monitoring electricity consumption, electrode consumption, FIGURE 3 Second floor of the furnace building and location of victims at the time of the incident Location of victims

CSB • Carbide Industries Case Study 6 Carbide Industries Case Study Board Voting Copy February 2013 and flowrates, workers look through the control room window to judge the process perfor­ mance by the appearance (volume, color, and motion) of the flames that the process gases create when they exit the furnace and auto-ignite on contact with the room air. Cooling wa­ ter exits the hollow furnace cover sections and returns to a trough before being recirculated. Molten calcium carbide exits the EAF at about 3800°F through the drain holes in the sidewall of the furnace. The operator uses a motorized train system to move a deep tray on wheels, called a chill mold, to a hole position and an electric arc device to tap a drain hole through the solidified calcium carbide and other materials that plug the hole in the side of the furnace. The molten calcium carbide inside the furnace then drains from the tap hole into the chill mold. After filling multiple chill molds, the calcium carbide in that section of the furnace is drained, and the flow from the tap hole slows significantly. Operators then plug the hole with a mixture similar to mud and clay and move to tap the next location. Downstream units on- site dump the chill molds, grind and screen the calcium carbide, and package the product. The calcium carbide remains in the molds until it cools to about 500°F. U.S. Chemical Safety Board (CSB) investigators interviewed Carbide Industries personnel regarding difficulties in operating the process. In addition to incidents of cooling water leak­ ing from the furnace cover into the furnace, workers described instances of excess pressure developing in the furnace. They called these excess pressure incidents “blows” because the excess pressure would blow hot gases, and sometimes coke and lime feed material, out of the furnace onto the second floor of the building. These blows occurred in the furnace a few times per year. After a furnace blow, the operators would remove the ejected material and restart the furnace. The effects of water leaks varied from no noticeable impacts to potential effects such as bridging,5 which ultimately led to blows. The CSB could not find, nor did Carbide provide in response to requests, any documentation to indicate that these incidents or “blows” were investigated to determine their root cause. However, accident/incident investi­ gations were completed when injuries not specifically related to the furnace “blows” occurred. For example, one accident/incident investigation report provided by Carbide indicated that the tap hole “blew hot carbide” causing burns to an employee. 3.0 EMERGENCY PLANNING AND RESPONSE 3.1. COMMUNITY NOTIFICATION The Rubbertown community includes homes and industrial facilities in close proximity, and in 2002, the Rubbertown Community Awareness Line (RCALL) notification system was established to alert residents of all natural and manmade disasters. For incidents at the surrounding industrial facilities, a company representative was responsible for calling into the RCALL system to leave a message for the public. In addition, emergency responders sounded a siren that prompted residents to call the RCALL system to hear the message from the company representative. 5Bridging, also called arching, is the formation of a hollow cavity under a pile of solids that would otherwise flow downward under the force of gravity. The hollow cavity forms due to the cohesiveness of the particles, which prevents flow and can be formed due to the presence of water or insufficient mixing of fine particles in the feed.

CSB • Carbide Industries Case Study 7 Carbide Industries Case Study Board Voting Copy February 2013 3.2. TRAINING FOR EMERGENCY RESPONDERS Carbide Industries trained some of its workers to act as on-site emergency responders and to provide general awareness training for contractors. The company also trained the Lake Dreamland6 Fire Department for occasions where they might be needed to respond to incidents at the facility. The training materials included a slide presentation and a video that focus on furnace area hazards such as: • Large amounts of electrical energy • Extremely hot substances and surfaces • Potential for high concentrations of carbon monoxide (CO gas) • Calcium oxide (lime) In 2006, Carbide Industries and the Lake Dreamland Fire Department collaborated to produce the training video “Carbide Industries LLC Fire Control Video.” The video shows Lake Dreamland Firefighters responding to calcium carbide acetylene fires in a controlled situation with Carbide personnel observing. The video narrator describes the hazards and issues involved in extinguishing calcium carbide acetylene fires. However, neither the slide show nor the video provide detailed information on the hazards of contacting chemicals such as calcium carbide or calcium hydroxide on site. 4.0 INCIDENT DESCRIPTION At about 5:40 pm on Monday, March 21, 2011, the EAF at the Carbide Rubbertown facility violently overpressured, ejecting solid and powdered debris, hot gases, and molten calcium carbide at temperatures near 3800°F (2100°C). Witnesses reported an initial overpressure event from the furnace, a large explosion, and two to three more overpres­ sure events. The cloud of debris and smoke traveled high enough to obscure the five-story furnace building (Figure 4). The hot gases and debris blown from the furnace broke through the double-pane reinforced glass window of the control room, severely burning the two workers inside; they died within 24 hours from their injuries. Hot material also was ejected from the active tap hole on the mezzanine level. One worker was in an operating shack about 30 feet from the tap hole. The door to the shack was ajar, and he crouched to the floor, seeking shelter from the hot gases and dust that engulfed him. He received a minor burn to the back of his neck, but did not seek medical treatment. Another worker was walking away from the furnace when the explosion knocked him to the ground and the hot gases and debris engulfed him. He was taken to a maintenance area, where he was given oxygen and his vital signs monitored. He was later taken to the hospital for observation and subsequently released. 4.1. EMERGENCY RESPONSE Carbide Industries Safety, Health and Environmental (SH&E) Manager and members of the Carbide emergency response team helped evacuate the two workers from the control room, provided oxygen, and monitored vital signs. 6The Lake Dreamland Fire District, located in southwestern Jefferson County, includes residential and commercial areas in addition to industrial facilities.

CSB • Carbide Industries Case Study 8 Carbide Industries Case Study Board Voting Copy February 2013 Incident command was established about two minutes after the event occurred. An Assistant Fire Chief of the Lake Dreamland Fire Department was driving by at the time of the incident and immediately responded by assuming the role of Incident Commander (IC) and activating response based on National Incident Management System (NIMS)7,8 protocols.9 Because of concerns of possible product contamination and the unknown conditions of the immediate location of the incident, the incident commander established a staging area about one-half mile upwind from the facility and a command post at the front gate and called ambulances to the staging area. The first ambulance was dispatched at 5:40 pm with two more dispatched shortly thereafter and arrived on scene within 15 minutes. Carbide personnel and Lake Dreamland Firefighters transported the injured employees to the main gate where they met emergency medical technicians (EMTs). The fire department decontaminated the injured employees with water while the Carbide emergency response team and a fire department paramedic provided oxygen and monitored vital signs. One victim went into cardiac arrest, and the paramedic began performing CPR on him. About 40 minutes after the initial incident, off-site EMS began transporting victims to the hospital. These victims arrived at the hospital about 12 minutes later, and succumbed to their injuries in less than 24 hours. A third ambulance transported the injured worker who had been knocked to the ground and injured by the blast. 5.0 ANALYSIS 5.1. PHYSICAL CAUSE OF THE INCIDENT The CSB was unable to determine the exact cause of the March 21 incident, but several plausible scenarios were developed through a review of plant records, interviews with em­ ployees, and reconstruction based on known characteristics of the calcium carbide process. FIGURE 4 (LEFT) Cloud of debris and smoke obscures the five- story furnace building (Photo courtesy Lake Dreamland FD) 7The Department of Homeland Security established the National Incident Management System as a uniform, scalable template to enable governments, nongovernmental organizations (NGOs), and the private sector to work together to prevent, protect against, respond to, recover from, and mitigate the effects of incidents. 8The community notification system in effect on the day of the incident was the Rubbertown Community Action Line (RCALL) system. Carbide personnel were focused on the victim rescue efforts and no one left information on the RCALL line for residents in the surrounding community. Because RCALL was the information conduit, the community had no updates on the incident for 90 minutes following the explosion. 9Lake Dreamland Fire Department’s jurisdiction includes 17 industrial and chemical facilities, and the incident commander reported being familiar with all of them through previous response efforts at those facilities. Lake Dreamland, Pleasure Ridge, and Dixie Suburban Fire Departments all responded to the incident. FIGURE 5 (RIGHT) Second floor of the EAF building after the explosion

CSB • Carbide Industries Case Study 9 Carbide Industries Case Study Board Voting Copy February 2013 Examination of the underside of the furnace cover revealed that much of the refractory lining was worn and identified holes where cooling water had leaked into the furnace. Figure 6 is a diagram of the furnace cover showing recent recurring water leaks in water cooling zones. The CSB considered several possible mechanisms that led to the tragic incident. Leaks begin due to thinning of the refractory lining, fouling,10 and the accumulation of solids inside the hollow chamber where water flows. Because the fouling insulates the metal on the under­ side of the furnace cover from the cooling water, the high temperature of the furnace softens the metal and the metal sags under its own weight (Figure 7). With continued exposure to the furnace temperatures, the sagging bulge cracks open, which led to the formation of a leak (Figures 7 and 8). Another possible cause of leaks is the sudden eruption of hot liquid from the furnace, which the operators call a boil-up. Repeated boil-ups of hot material from the furnace can cause a water leak by contacting the underside of the furnace cover, eroding its ceramic lining, and eventually melting a hole in the metal furnace cover causing a water leak. The presence of electric current requires that the furnace be shut down for workers to climb onto the furnace cover and repair water leaks. Carbide personnel described how they repair small holes by adding a mixture of oats and boiler solder, a commercially available powder used to repair leaks in steam boilers, to the cooling water. The cooling water flow pushes this mate­ rial to the leak, and as the water evaporates at the leak point, the oats and boiler solder form a plug. Carbide repairs larger leaks by welding metal plates on the inside of the hollow cavity through which the water flows to patch the hole; while this method prevents water from leaking 10Fouling is the accumulation of unwanted material on solid surfaces and decreases function. The fouling material can consist of either living organisms (biofouling) or a non-living substance (inorganic or organic). Fouling usually occurs on a surface of a component, system or plant performing a defined and useful function, and the fouling process impedes or interferes with this function. FIGURE 6 Diagram of the furnace cover showing areas of recent recurring water leaks

CSB • Carbide Industries Case Study 10 Carbide Industries Case Study Board Voting Copy February 2013 into the furnace, it leaves a lower layer of uncooled metal hanging beneath the now patched furnace cover. Maintenance records obtained by the CSB indicated 26 work orders to repair furnace cover water leaks in the four months prior to the March 2011 incident. As early as 1965, a publication by an EAF expert, G.W. Healy describes a similar sequence of overpressure events in calcium carbide furnaces and notes that fine particles in the feed material can possibly cause arching, even in the absence of water, and that insufficient mixing of the feed can cause the liquid to overheat. Healy also calculated that the temperature required to start an undesirable side reaction between calcium carbide and calcium oxide could be reached in as little as one minute after the feed arches. His calculations recognized that the reaction between calcium carbide and calcium oxide generates gas two and a half times as fast as the normal calcium carbide-forming reaction. Independent analysis performed for the CSB indicated that, based on the operating data from Carbide, operating conditions on the day of the incident would have generated sufficient energy to emit hot materials from inside the furnace. 5.2. NORMALIZATION OF DEVIANCE 5.2.1. Carbide Industries The Carbide Industries facility has operated for over 30 years, and had a history of low con­ sequence incidents in the furnace. The CSB interviews with operators indicated that smaller overpressure incidents (“blows”) occurred in the furnace for the last 20 years. In 1991 a large overpressure incident blew in the window to the control room; Carbide replaced the window glass with reinforced glass, which was damaged by a similar incident in 2004. After the 2004 incident, Carbide replaced the single pane reinforced glass with double pane reinforced glass, which was blown in by the March 2011 incident and which directly contributed to the fatal thermal injuries. Despite these previous incidents, Carbide’s response to the previous incidents did not sufficiently address the hazard nor prevent the events from escalating. The CSB requested investigation reports for the 1991 and 2004 incidents and engineering analyses for the modifications to the window, but Carbide was unable to provide any analyses, meeting summaries, or other documentation. Without a proper investigation of the incident, Carbide could not address the root causes to prevent future incidents, nor could the company perform a detailed hazard analysis that could have identified other potential incident scenarios. By failing to analyze these incidents further, Carbide did not identify and address the potential for even higher consequence incidents. Such an analysis would have likely identified the need to relocate the control room and install video cameras to monitor furnace operations. This would eliminate the need for a window and reduce personnel exposure to heat and overpressures produced by a furnace blow. FIGURE 7 (LEFT) Crack in furnace cover formed due to fouling FIGURE 8 (RIGHT) Cooling water leak in furnace cover with ceramic lining worn away

CSB • Carbide Industries Case Study 11 Carbide Industries Case Study Board Voting Copy February 2013 Furthermore, because Carbide did not thoroughly determine the root causes of the blows and eliminate them, the occurrence became normalized in the day-to-day operations of the facility, including a blow which occurred earlier during a shift on the day of the incident. This deficient approach to managing a process is termed by Diane Vaughn as, “normalization of deviance,” and is defined as the gradual shift in what is regarded as normal after repeated exposures to “deviant behavior.” In this instance, the behavior was a tolerance to what should have been abnormal events (the blows). The result was a new normal, in which a boom occurring in the furnace was routine. The CSB interviews verified that furnace blows were considered normal, as was revealed in the following information obtained during an interview with a Carbide employee: About 5:00 o’clock … we heard the – heard the furnace – you know – do a little booming – you know. And I didn’t think much – much of it, just the sound of it and stuff – you know. It – it sounded normal when it does it. And then, it was just a little while after that, it went off again, and it was – it wasn’t normal. Past Carbide incident investigations indicate that injuries occurred due to handling raw materi­ als, tapping holes, and blowing out lines at the furnace. These incidents speak to the hazards associated with the process of producing calcium carbide and further emphasize the need for additional analysis to determine the root causes. Normalization of deviance played a role in other major accidents investigated by the CSB such as the explosion at the BP refinery in Texas City, TX; the Imperial Sugar dust explosion in Port Wentworth, GA; and the fatal phosgene leak at the DuPont plant in Belle, WV. In spite of past warnings from alarms, near-misses, or lower severity incidents, each of these companies failed to control a hazard, and a high severity incident occurred later. 5.3. CODES AND STANDARDS 5.3.1. NFPA 86 Standard for Ovens and Furnaces The stated mission of the National Fire Protection Association (NFPA) is to reduce the worldwide burden of fire and other hazards on the quality of life by providing and advocat­ ing consensus codes and standards, research, training, and education. NFPA 86, Standard for Ovens and Furnaces, an industry consensus standard, applies to facilities with ovens and furnaces. The majority of the standard applies to new or significantly modified con­ struction, when the authority having jurisdiction adopts the standard into state or local codes, such as building codes and fire prevention codes. According to Section 3.3.25.3 of NFPA 86, Standard for Ovens and Furnaces (2011 ed.) a Class A furnace is, “An oven or furnace that has heat utilization equipment wherein there is a poten­ tial explosion or fire hazard that could be occasioned by the presence of flammable volatiles or combustible materials processed or heated in the furnace.” A Class B furnace is defined in the same standard as, “An oven or furnace that has heat utilization equipment wherein there are no flammable volatiles or combustible materials being heated.” While most EAFs are used for melting metals, and therefore are considered Class B furnaces, some products such as calcium carbide and ferrosilicon are produced in EAF processes that contain flammable gases and low oxygen atmospheres. The furnace involved in the March 21 incident is considered by definition a Class A furnace because it collects and vents flammable gases in a low oxygen environment that are a by- product of the chemical reactions that produce calcium carbide. Because NFPA 86 is silent on coverage for EAFs operating as Class A furnaces, there are no operational requirements

CSB • Carbide Industries Case Study 12 Carbide Industries Case Study Board Voting Copy February 2013 specifically directed to Class A EAFs for provisions such as safety devices, interlocks, and safe distances to occupied work areas. The NFPA 86 Section 11.7.1 for Class A furnaces includes specific requirements for operating “Low Oxygen Atmosphere Class A Ovens with Solvent Recovery.” The requirements contain specifications to ensure safe operation by urging: • Oven design that accommodates safe operating procedures (avoiding flammable atmospheres, purging with inert gas before start-up, shutdown procedures to avoid the flammable region of the solvent, and emergency shutdown procedures); • Oven construction and location that minimizes the exposure of people to possible injury from fire, explosion and hazardous materials, as found in the General Chapter, Chapter 5, Section 5.1.1.1 and 5.1.3; • Inert gas generation and storage, including compliance with ASME standard B31.3, and Section 11.7.8; • Continuous oxygen monitoring and control by inert gas addition as found in Section 11.7.2. 5.3.2. KENTUCKY STANDARDS OF SAFETY Kentucky Statute Section 227.300 created rules and regulations known as the “Standards of Safety,” which established requirements for design and construction of various facilities, including facilities with Class A furnaces. The State Fire Marshal is considered the authority having jurisdiction to enforce the standards, including approving new construction permits and conducting inspections. When Carbide Industries installed the EAF in 1968, adherence to NFPA 86 (1950 ed.) was required by the Kentucky Standards of Safety.11 The 1950 NFPA 86 definition of the Class A ovens and furnaces was similar to the definition in the current (2011) edition, but included an exclusion based on temperature, which the 1982 version eliminated. 5.4. FACILITY SITING In 1968, Carbide Industries installed the furnace 12 feet from the control room that served as a workstation for one employee continuously for each shift. As a result of the 2011 explosion, two employees in the control room at the time of the incident died from injuries sustained in the blast. Their injuries are attributed to their proximity to the furnace, and by the blast and thermal heat transfer when the incident occurred. The state fire prevention code, the Kentucky Standards of Safety (Section 4.5.4), required conformance to NFPA 86 at the time of furnace rebuild in 1982. The 2011 edition of NFPA 86, Standard for Ovens and Furnaces, lists the following requirements in Chapter 5, “Location and Construction”: Furnaces and related equipment shall be located so as to protect personnel and buildings from fire or explosion hazards. However, NFPA 86 does not provide specific requirements on determining the distances between occupied areas and processes capable of producing a fire, explosion or an overpressure event within the same building or enclosure. The CSB has noted the issue of siting hazardous processes near occupied areas in several of its investigations, including BP in Texas City, TX; Veolia Environmental Services in Carrollton, OH; First Chemical Corporation in Pascagoula, MS; and Sterigenics, Inc. in 11Kentucky Statute Section 227.300 established rules and regulations known as the “Standards of Safety.” The 1955 version, in effect at the time of the 1968 Carbide furnace construction, required conformance to the 1950 edition of NFPA 86, Standard for Class A Ovens and Furnaces.

CSB • Carbide Industries Case Study 13 Carbide Industries Case Study Board Voting Copy February 2013 Ontario, CA. In addition to the CSB, the American Petroleum Institute (API) and the Center for Chemical Process Safety (CCPS) have provided guidance for the proper siting of buildings near process units. NFPA codes, such as NFPA 30 and adopted building and fire codes, include considerations for location and construction of occupied areas near processes but do not give specified distances or a quantitative process for determining how far a control room, labo­ ratory, lunch area, or office should be located from a furnace, vessel, or chemical process with the potential for a fire or explosion. Little guidance exists in the public domain for the location of occupied areas within the same building or enclosure as a chemical process with deflagration or explosion potential. 5.5. REGULATORY OVERSIGHT 5.5.1. U.S. Occupational Safety and Health Administration (OSHA) The Process Safety Management Standard, 29 CFR 1910.119 (PSM), is an OSHA-enforceable regulation for processes that contain highly hazardous materials or significant quantities of flammables. The intent of PSM, as stated in the standard, is for “preventing or minimizing the consequences of catastrophic releases of toxic, reactive, flammable, or explosive chemicals. These releases may result in toxic, fire or explosion hazards.” PSM applies to processes using or producing any of the 137 listed toxic chemicals at or above threshold quantities and processes with flammable liquids or gases onsite in quantities of 10,000 pounds or more in one location. The EAF process at Carbide Industries did not contain chemicals in large enough quantity to be regulated by OSHA PSM. However, if applied to the Carbide Industries process, elements of PSM such as incident investigation, mechanical integrity, and training would have required prac­ tices and procedures that could have prevented or lessened the consequences of the explosion. Carbide Industries had scheduled to replace the furnace cover in May 2011, but the new cover was incomplete at the time of the explosion—it had been fabricated and was waiting for refractory lining. More important is that Carbide failed to implement a mechanical integrity program as would have been required under the PSM standard if it had applied; thus the company lacked a program to ensure the timely replacement of the furnace cover prior to failure. If Carbide had adhered to the standard, it could have systematically tracked the maintenance of the cover over time and predicted its safe service life. The Kentucky Labor Cabinet proposed penalties of $72,800.00 as a result of this incident. The Carbide facility received two citations—one willful, and one serious. As this case study went to publication, all penalties were being contested by Carbide, and the citations were unresolved. The citations alleged that employees worked in close proximity to electric arc furnaces that were not operated with a robust inspection and preventive maintenance program exposing them to serious or fatal injuries. The citations alleged that Carbide had knowledge of the hazards of furnace explosions and fires as documented in the plant’s 1998 Emergency Response Plan. The facility was also cited because emergency response team members allegedly had not received training with respect to response procedures for furnace explosions. 6.0 KEY FINDINGS During the investigation of the events at the Carbide Industries facility, the CSB found:

  1. The force of an explosion in the EAF broke the reinforced control room window, killing

two workers.

  1. Previous furnace overpressure events had broken the control room window but had not

caused fatalities.

CSB • Carbide Industries Case Study 14 Carbide Industries Case Study Board Voting Copy February 2013

  1. Despite past incidents, neither the previous owners nor Carbide Industries identified that

the control room should be relocated and cameras installed to better protect workers while they remotely monitored the furnace.

  1. Carbide Industries issued 26 work orders for leak repair for water leaks on the furnace cover

in the five months prior to the March 2011 incident, but continued operating the furnace despite the hazard from ongoing water leaks.

  1. The company did not adequately address past explosive incidents, which normalized blows as

routine events.

  1. Carbide Industries had a new furnace cover built, which was waiting for refractory lining at

the time of the incident.

  1. The company did not have a process safety management program in place that required the

elimination of overpressure incidents in the furnace.

  1. NFPA 86 does not specify safety requirements for electric arc furnaces operating as Class A

furnaces such as the one at Carbide Industries. 7.0 RECOMMENDATIONS 7.1. NATIONAL FIRE PROTECTION ASSOCIATION 2011-5-I-KY-R1 Establish a committee to evaluate and develop a standard that defines the safety requirements for electric arc furnaces operated with flamma­ ble materials and low oxygen atmospheres. At a minimum, establish requirements that electric arc furnaces containing flammables have:

• Adequate safety instrumentation and controls to prevent explosions and overpressure events;

• Mechanical integrity and inspection programs;

• A documented siting analysis to ensure that control rooms and other occupied areas are adequately protected. 7.2. CARBIDE INDUSTRIES 2011-5-I-KY-R2 Modify the design and procedures for the electric arc furnace and re­ lated structures including the control room to comply with the NFPA standard developed per R1 of this case study. 2011-5-I-KY-R3 Implement a mechanical integrity program for the electric arc furnace and cover, including preventive maintenance based on periodic inspec­ tions, and timely replacement of the furnace cover. At a minimum, the program should include factors such as leak detection and repair and refractory lining wear.

CSB • Carbide Industries Case Study 15 Carbide Industries Case Study Board Voting Copy February 2013 8.0 REFERENCES American Petroleum Institute (API). Standard RP-752: Management of Hazards Associated With Location of Process Plant Buildings. Publication 752. Washington DC, 2009. API. Standard RP-753: Management of Hazards Associated With Location of Process Plant Portable Buildings. Publication 753, Washington, DC, 2007. Babrauskas, V. Ignition Handbook, 1st ed. Issaquah, WA, Fire Science Publishers. 2003. Center for Chemical Process Safety (CCPS). Guidelines for Facility Siting and Layout, American Institute of Chemical Engineers, Center for Chemical Process Safety NY, NY. 2003. Healy, G. W. Why a Carbide Furnace Erupts: Proceedings of Electric Furnace Conference. 1965; pp 62-67. Kirk-Othmer Encyclopedia of Chemical Technology. 1st ed. John Wiley and Sons, Inc. NY: 1994; pp 228-242. Lewis, Sr., R. J., Sax’s Dangerous Properties of Industrial Materials. 9th ed. Van Nostrand Reinhold NY, 1996; p. 37. Pohanish, R. P., Sittig’s Handbook of Toxic and Hazardous Chemicals and Carcinogens. 4th ed. Noyes Publications / William Andrew Publishing. Norwich, NY. 2002. U.S. Chemical Safety and Hazard Investigation Board Investigation Report, Catalyst Systems Inc. Reactive Chemical Explosion, in Gnadenhutten, OH, No. 2003-03-C-OH. 2003. U.S. Chemical Safety and Hazard Investigation Board Investigation Report, DuPont Corporation Toxic Chemical Releases in Belle, WV. No. 2010-6-I-WV. 2010. U.S. Chemical Safety and Hazard Investigation Board Investigation Report, BP America Refinery Explosion, in Texas City, TX; No. 2005-04-I-TX. 2005. U.S. Chemical Safety and Hazard Investigation Board Investigation Report, First Chemical Corporation Reactive Chemical Explosion, in Pascagoula, MS; No. 2003-01-I-MS. 2003. U.S. Chemical Safety and Hazard Investigation Board Investigation Report, Imperial Sugar Company Dust Explosion and Fire, in Port Wentworth, GA; No. 2008-05-I-GA. 2008. U.S. Chemical Safety and Hazard Investigation Board Investigation Report, Sterigenics Ethylene Oxide Explosion in Ontario, CA; No. 2004-11-I-CA. 2004. U.S. Chemical Safety and Hazard Investigation Board Investigation Report, Veolia Environmental Services Flammable Vapor Explosion and Fire in West Carrollton, OH; No. 2009-10-I-OH. 2009. Urben, P.G., and Pitt, M.J. Bretherick’s Handbook of Reactive Chemical Hazards. 6th ed. Oxford: Butterworth Heinemann. 1999; p 254. Vaughn, D., Risky Technology, Culture, and Deviance at NASA. 1st ed. Chicago, IL University of Chicago Press. 1996.

CSB • Carbide Industries Case Study 16 Carbide Industries Case Study Board Voting Copy February 2013 APPENDIX A. SIMPLIFIED DIAGRAM OF CALCIUM CARBIDE PROCESS

CSB • Carbide Industries Case Study 17 Carbide Industries Case Study Board Voting Copy February 2013 CSB Investigation Reports are formal, detailed reports on significant chemical accidents and include key findings, root causes, and safety recommendations. CSB Hazard Investigations are broader studies of significant chemical hazards. CSB Safety Bulletins are short, general-interest publications that provide new or noteworthy information on preventing chemical accidents. CSB Case Studies are short reports on specific accidents and include a discus­ sion of relevant prevention practices. All reports may contain include safety recommendations when appropriate. CSB Investigation Digests are plain-language summaries of Investigation Reports. The U.S. Chemical Safety and Hazard Investigation Board (CSB) is an independent Federal agency whose mission is to ensure the safety of workers, the public, and the environment by investigating and preventing chemical incidents. The CSB is a scientific investigative orga­ nization; it is not an enforcement or regulatory body. Established by the Clean Air Act Amendments of 1990, the CSB is responsible for determining the root and contributing causes of accidents, issuing safety recommendations, studying chemical safety issues, and evaluating the effectiveness of other government agencies involved in chemical safety. No part of the conclusions, findings, or recommendations of the CSB relating to any chemical accident may be admitted as evidence or used in any action or suit for damages. See 42 U.S.C. § 7412(r)(6)(G). The CSB makes public its actions and decisions through investigation re­ ports, summary reports, safety bulletins, safety recommendations, case studies, incident digests, special technical publications, and statistical reviews. More information about the CSB is available at www.csb.gov. CSB publications can be downloaded at www.csb.gov or obtained by contacting: U.S. Chemical Safety and Hazard Investigation Board Office of Congressional, Public, and Board Affairs 2175 K Street NW, Suite 400 Washington, DC 20037-1848 (202) 261-7600

FD06463 | 2013_美国_donaldson-enterprises-inc-fatal-fireworks-disassembly-explosion-and-fire.pdf

分类:06_境外及港澳台调查报告 | 年份:2013 | 地域: | 严重程度: | 场所: | 起火原因: | 来源格式:pdf

Analysis of Pyrotechnic Components Results of chemical, thermal and mechanical insult testing of components of four fireworks samples 31 December 2013 Amy J. R. Bauer

1

Table of Contents Table of Figures ............................................................................................................................................. 3 List of Acronyms ............................................................................................................................................ 4 1.0 Executive Summary ................................................................................................................................. 5 2.0 Introduction ............................................................................................................................................ 5 3.0 Approach and Objectives ........................................................................................................................ 7 4.0 Experimental Methods and Procedures ................................................................................................. 9 4.1 Handling Precautions .......................................................................................................................... 9 4.2 Sample Preparation .......................................................................................................................... 10 4.2.1 Sample Preparation for Mechanical Insult Testing .................................................................... 10 4.2.2 Sample Preparation for Chemical and Thermal Testing ............................................................ 11 4.3 Brief Test Descriptions of All Tests .................................................................................................... 12 4.3.1 Mechanical Insult Test – Impact. ............................................................................................... 12 4.3.2 Mechanical insult test – Friction ................................................................................................ 13 4.3.3 Electrostatic Discharge test........................................................................................................ 14 4.3.4 Scanning Electron Microscope – Energy Dispersive X-ray (SEM-EDAX) Analysis ....................... 14 4.3.5 Inductively Coupled Plasma Atomic Emissions Spectroscopic (ICP-AES) Analysis ..................... 15 4.3.6 Fourier Transform Infrared Spectroscopy (FTIR) Analysis ......................................................... 15 4.3.6 Differential Scanning Calorimetry (DSC) Analysis ...................................................................... 15 5.0 Data, Observations and Results ............................................................................................................ 16 5.1 O-Triple-C Results.............................................................................................................................. 22 5.1.1 Sample O-Triple-C, Sub-sample A .............................................................................................. 22 5.1.2 Sample O-Triple-C, Sub-sample ................................................................................................. 25 5.1.3 O-Triple-C, Sub-sample C ........................................................................................................... 27 5.2 Sky Festival Samples.......................................................................................................................... 28 5.2.1. Sky Festival Sub-sample A ......................................................................................................... 28 5.2.2. Sky Festival Sub-sample B ......................................................................................................... 30 5.2.3. Sky Festival Sub-sample C ......................................................................................................... 31 5.2.4. Sky Festival Sub-sample D ......................................................................................................... 33 5.2.5. Sky Festival Sub-sample E ......................................................................................................... 35 5.2.6. Sky Festival Sub-sample F ......................................................................................................... 36 5.2.7. Sky Festival Sub-sample G ......................................................................................................... 38

2

  1. 3 Halawa Samples ................................................................................................................................ 39
  2. 3.1. Halawa Sample A ...................................................................................................................... 39
  3. 3.2. Halawa Sample B ....................................................................................................................... 40
  4. 3.3. Halawa Sample C ....................................................................................................................... 42
  5. 4 Krazy Kids Samples ............................................................................................................................ 43
  6. 4.1. Krazy Kids Sample A .................................................................................................................. 43
  7. 4.2. Krazy Kids Sample B .................................................................................................................. 45
  8. 4.3. Krazy Kids Sample C .................................................................................................................. 47
  9. 5 Standards .......................................................................................................................................... 48
  10. 5.1. Potassium chlorate and aluminum homemade flash powder .................................................. 48
  11. 5.2. Potassium perchlorate and aluminum homemade flash powder ............................................ 49
  12. 5.3. Potassium perchlorate/chlorate mixed and aluminum homemade flash powder................... 50
  13. 0 Discussion ............................................................................................................................................. 52
  14. 1 Results Categorization ...................................................................................................................... 52
  15. 1.1 Lift Charges................................................................................................................................. 53
  16. 1.2 Flash Powder .............................................................................................................................. 53
  17. 1.3 Stars/Comets .............................................................................................................................. 53
  18. 1.4 Clay ............................................................................................................................................. 54
  19. 2 Particle Size Effects ........................................................................................................................... 54
  20. 3 Differential Scanning Calorimetry Observations............................................................................... 54
  21. 0 Conclusion ............................................................................................................................................. 55
  22. 0 References ............................................................................................................................................ 55
  23. 0 Appendix .............................................................................................................................................. 55
  24. 0 Acknowledgments ............................................................................................................................... 56

3

Table of Figures Figure 1 Components of a typical aerial firework1 ....................................................................................... 6 Figure 2. Photo of initial cutting procedure. ............................................................................................... 10 Figure 3. Initial processing of the larger samples; chopping with a razor blade. ....................................... 11 Figure 4. Completely processed powder. ................................................................................................... 11 Figure 5. MBOM Impact Testing Machine .................................................................................................. 12 Figure 6. ABL Friction Testing Machine ...................................................................................................... 13 Figure 7. ABL Friction Machine, showing a positive result ........................................................................ 13 Figure 8. Detail of electrode assembly of ESD testing machine. ................................................................ 14 Figure 9. ABL Electrostatic Discharge Testing Machine. ............................................................................. 14 Figure 10. Enlarged photograph of O-Triple-C, A........................................................................................ 22 Figure 11. 40x SEM image of O-Triple-C, A. ................................................................................................ 22 Figure 12. SEM and EDAX data of O-Triple-C, A. ......................................................................................... 23 Figure 13. DSC results for O-Triple-C, A, showing no thermal decomposition below 500 degrees C. ....... 24 Figure 14. Enlarged photo of O-Triple-C, B. ................................................................................................ 25 Figure 15. SEM and EDAX data, O-Triple-C B. ............................................................................................. 25 Figure 16. DSC data from O-Triple-C, B. Sample decomposition onset at 365 degrees C. ....................... 26 Figure 17. Enlarged photo of O-Triple-C, C. ................................................................................................ 27 Figure 18. SEM and EDAX data for O-Triple-C, C......................................................................................... 27 Figure 19. Enlarged photo of Sky Festival A sample. .................................................................................. 29 Figure 20. SEM and EDAX data of Sky Festival A. ....................................................................................... 29 Figure 21. Enlarged photo of Sky Festival B. .............................................................................................. 30 Figure 22. SEM and EDAX data for Sky Festival B sample. .......................................................................... 31 Figure 23. Enlargement of photo of Sky Festival Sub-sample C. ................................................................ 32 Figure 24. The EDAX analysis on this slide is of the whole image.............................................................. 32 Figure 25. Enlarged photo of Sky Festival sample D. .................................................................................. 33 Figure 26. SEM and EDAX data on Sky Festival D, note the predominance of the P peak. ........................ 34 Figure 27. SEM and EDAX data on Sky Festival D. ....................................................................................... 34 Figure 28. Enlarged photo of Sky Festival E ................................................................................................ 35 Figure 29. SEM image of Sky Festival E, scale on bottom ........................................................................... 35 Figure 30. EDAX results of Sky Festival E, S and K dominating ................................................................... 36 Figure 31. Enlarged photo of Sky Festival F ............................................................................................... 37 Figure 32. SEM image of Sky Festival F, showing texture of black particle ............................................... 37 Figure 33. EDAX results of Sky Festival F, showing a clay-like composition .............................................. 37 Figure 34. Photo of Sky Festival G sample ................................................................................................. 38 Figure 35. SEM image of Sky Festival G sample ......................................................................................... 38 Figure 36. EDAX results of Sky Festival G sample ...................................................................................... 38 Figure 37. Enlarged photo of Halawa sample A. ........................................................................................ 39 Figure 38. SEM and EDAX data for Halawa sample A. ................................................................................ 40 Figure 39. Enlarged photo of Halawa sample B .......................................................................................... 41 Figure 40. SEM and EDAX data for Halawa sample B ................................................................................. 41

4

Figure 41. Enlarged photo of Halawa C sample. ........................................................................................ 42 Figure 42. SEM and EDAX data for Halawa C sample. ................................................................................ 43 Figure 43. Enlarged photo of Krazy Kids sample A. .................................................................................... 44 Figure 44. SEM and EDAX data of Krazy Kids sample A. ............................................................................. 44 Figure 45. Enlarged photo of Krazy Kids sample B. ..................................................................................... 45 Figure 46. SEM and EDAX data of white regions of Krazy Kids sample B, Ba peaks dominating. .............. 46 Figure 47. Enlarged photo of Krazy Kids sample C. ..................................................................................... 47 Figure 48. SEM and EDAX data of Krazy Kids sample C............................................................................... 47 Figure 49. KClO3 crystal in homemade flash powder ................................................................................. 49 Figure 50. EDAX results for KClO3 flash powder......................................................................................... 49 Figure 51. SEM of KClO4 and Al flash powder standard ............................................................................. 50 Figure 52. EDAX results from KClO4 and Al flash powder .......................................................................... 50 Figure 53. SEM image of KP&KC + Al homemade flash powder ................................................................ 51 Figure 54. EDAX analysis of the mixed flash powder ................................................................................. 51 Figure 55. DSC run of mixed flash powder, showing that chlorate can be detected in a DSC endotherm 52 List of Acronyms ABL - Alleghany Ballistics Laboratory ATF - Bureau of Alcohol, Tobacco, Firearms and Explosives ATF-FTIR - Attenuated total reflectance Fourier-transform infrared spectrometry ARA - Applied Research Associates CSB - U.S. Chemical Safety Board DI - deionized water DSC - differential scanning calorimetry EDS - electrostatic discharge EDAX - energy dispersive X-ray spectrometry FTIR - Fourier-transform infrared spectrometry IC - ion chromatography ICP-AES - inductively coupled plasma atomic emission spectrometry LC/MS - liquid chromatography mass spectrometry MBOM - modified Bureau of Mines ml - milliliter MIL-STD - military standard NA - not applicable NCOI - non-conflict of interest PETN - pentaerythritol tetranitrate PPE - personal protective equipment RDX - cyclotrimethylenetrinitramine SEM - scanning electron microscopy TIL- threshold of initiation level

5

  1. 0 Executive Summary

This document describes testing of the physical and chemical characteristics of component samples of four fireworks collected and provided by the CSB to determine whether these samples had chemical or physical characteristics that would potentially increase their susceptibility to unintentional or accidental initiation. This document contains a narrative that discusses the merged results of an extensive set of mechanical insult, thermal sensitivity and chemical composition testing. All the raw analytical data is present in the attached Appendices. Although no formal testing protocol exists to determine sensitivity of pyrotechnic materials, all analyses were performed with well-characterized, industry standard testing. Sensitivity to mechanical insult was evaluated through use of calibrated instruments and military-approved methods to establish response to impact, friction and electrostatic discharge. These mechanical insult tests showed that although some of the materials were indeed very sensitive, that appreciable similarity exists between samples of material having the same purpose within the firework (the components are discussed in the next section). It should also be noted at the outset that these materials are expected to be quite sensitive, and that our results are in agreement with the basic nature of all fireworks materials, especially flash powder mixtures. Elemental composition analysis was performed on the dry samples with scanning electron microscopy and x-ray elemental analysis (SEM-EDAX) and after partial dissolution in water, by inductively-coupled plasma spectrometry (ICP-AES). Anions were analyzed with liquid chromatography/mass spectrometry (LC/MS) (perchlorate) and ion chromatography (IC) (anions, in this case, chlorate and nitrate), and also by attenuated total reflectance Fourier- transform infrared spectrometry (ATF-FTIR) analyses. The results of the chemical analysis demonstrated no definitive unusual chemistry in any of the samples, and that the composition of different samples having the same purpose within the fireworks was relatively conserved. The likelihood of adverse reaction when exposed to high temperatures was evaluated with differential scanning calorimetry. None of the samples exhibited sensitivity to temperatures less than 350 °C. Key findings of the testing:  The presence of sensitizing chlorates was not established.  Thermal and testing regarding susceptibility to mechanical insult indicate that the flash powder type components are in general quite sensitive relative to standard reference material (military explosives and lab-generated flash powder), but that this sensitivity was expected by virtue of the chemical composition of the materials. 2.0 Introduction Fireworks are a class of explosive pyrotechnic devices used for aesthetic, cultural, and religious purposes. They are most commonly used as part of a fireworks display. Fireworks produce four primary effects: noise, light, smoke and floating materials (confetti, for example). They are designed to burn with flames and sparks of many colors. Displays are popular throughout the world and are the focal point of many cultural and religious celebrations, including Independence Day in the U.S.

6

Fireworks are generally classified as to where they perform, either as a ground or aerial firework. In the latter case they may provide their own propulsion (typically called a skyrocket) or be shot into the air by a mortar (aerial shell). The most common feature of fireworks is a paper or cardboard tube or casing filled with the combustible material, often pyrotechnic stars. The aerial shell is the backbone of today's commercial aerial display. A smaller version for consumer use is known as the festival ball in the United States. There are also ground fireworks; while less popular than aerial fireworks, they can produce various shapes like rotating circles, stars and 3D globes. Fireworks are composed of several types of materials that vary with their purpose in the overall device. Figure 1 shows the energetic material components of typical commercially-produced aerial display fireworks, consisting of an ignition fuse, lifting charge, time fuse, bursting charge and pyrotechnic “stars” or “comets.” These components, shown in Figure 1, each contain specific types of materials that enable that component to perform its established purpose.1

Figure 1 Components of a typical aerial firework1 Although there are numerous variations of actual fireworks construction, the lift and burst charges are propellants usually very similar to black powder (i.e. gun powder), comprised of mixtures of potassium nitrate (KNO3), charcoal and sulfur. Upon ignition, these materials generate the large quantities of gas needed to propel the rest of the device into the air. Flash powders, so named because of their initial use in early flash photography, are often used in fireworks to create a loud report and have compositions consisting of mixtures of potassium perchlorate, aluminum and magnesium powders and sulfur. The flash powder itself is often in the form of a very fine, silvery-colored powder, and in this powder form will react very quickly, especially when contained, to generate intense noises and brief, bright flash effects. The stars or comets are formed by blending variations of flash powder with binders so that they can be pressed or extruded into consolidated pellets. In pellet form, the stars or comets will burn relatively slowly to produce the aerial showers so popular in fireworks displays. Based on the literature, there are many types of stars and comets. A couple of well-represented recipes from Skylighter.com are shown here. The first type consists of a perchlorate/nitrate/gum rubber base which contains potassium perchlorate, a mix of finely divided aluminum and magnesium

7

powders, very fine charcoal powder, potassium nitrate, red gum, and powdered sulfur. In another major type, potassium perchlorate is substituted with potassium nitrate and blended with the fine charcoal powder, sulfur, dextrin, and flaked aluminum.2 Metal salts are added to create the colors associated with the fireworks. For example, strontium nitrate yields a bright red color, sodium nitrate is yellow and copper salts yield both blue and green, depending upon the anion associated with the copper. These components are assembled into a device as shown in Figure 1, and launched from a mortar to begin the processes that result in the display. As previously described, the lift charge propels the shell out of the mortar tube, and the time fuse ignites the burst charge at the correct altitude. The burst charge than creates the explosion of the shell and the release and ignition of the stars, causing the pattern that appears in the sky. One primary aim of the work was to test all the materials for the presence of chlorates, which used to be a common ingredient in flash powder mixtures. These compounds are recognized by the community to yield even more sensitive flash powder mixes than the more commonly used perchlorates. Chlorates are more dangerous in several ways. Firstly, they are known to be more inherently sensitive to mechanical insult. In addition, chlorates can react with sulfuric acid to form a highly reactive solution of chloric acid and potassium sulfate: 2 KClO3 + H2SO4 → 2 HClO3 + K2SO4 The products of the above reaction are sufficiently reactive that they will spontaneously ignite if combustible material (sugar, paper, etc.) is present.3 This is a particular problem when sulfur is present in the mixture, as almost all sulfur components will yield small amounts of sulfuric acid with time and exposure to humidity. The presence of chlorate compounds in fireworks is no longer common, but testing for this anion is important because of the additional danger in handling they represent. The results discussed in this report all indicate that the material submitted to us for testing is within the range of ordinary pyrotechnics recipes that can be discovered in literature and on the internet. This is not to say that the materials are not sensitive; they certainly are, as shown by the testing related to exposure to calibrated impact, frictional forces and electrostatic discharge. Quotations in the text describe that this degree of sensitivity is to be expected. 3.0 Approach and Objectives ARA received samples of 4 fireworks, each separated into subsamples by pyrotechnic component. These samples were chosen for analysis to determine if they were more sensitive to initiation than expected. This testing includes susceptibility to reaction by exposure to impact, frictional forces and exposure to electrostatic discharge, as well as chemical and thermal analysis. Altogether, 16 sampled materials were subjected to testing, along with five standard materials. Descriptions of all these materials are presented in Table 1.

8

Table 1. Samples and standards analyzed during this program Name of sample Physical Description Label markings Amount delivered O-Triple C #A fine gray sparkly powder

  1. 157 g

O-Triple C #B small black pebbles

  1. 294 g

O-Triple C #C round silver/gray balls about 0.25” in diameter

  1. 241 g

Sky Festival #A large gray pellets w/ black & brown crumbs “sm” 2.473 g Sky Festival #B large gray pellets w/ black & brown crumbs

  1. 482 g

Sky Festival #C fine gray sparkly powder “Lrg” 4.679 g Sky Festival #D fine gray sparkly powder “lrg tube” 5.063 g Sky Festival #E black particles, about 0 .5 mm across with copper colored dust “Large tube lift charge” 1.818 g Sky Festival #F copper-colored powder with black particles “Small ‘comet’ tube Lift Charge” 0.714 g Sky Festival #G grayish coarse powder “Small ‘Comet’ Tube Lift Charge Sample” 1.858 g Halawa #A small black pebbles “Lift charge” 6.680 g Halawa #B fine gray powder, with larger chunks

  1. 656 g

Halawa #C fine gray powder

  1. 706 g

Krazy Kids #A small black pebbles “Lift, 2 charges BSP” 8.178 g Krazy Kids #B 1 cm x 0.75 cm size silver/gray "pellets"

  1. 248 g

Krazy Kids #C 1 cm x 0.75 cm size silver/gray "pellets"

  1. 293 g

KP/Al standard fine gray powder

KC/Al standard fine gray powder

KP/KC/Al standard fine gray powder

RDX standard fine white powder

PETN standard fine white powder

The standards used in this work were of two distinct types. PETN (pentaerythritol tetranitrate) and RDX (cyclotrimethylenetrinitramine) are military grade explosives used to calibrate the instruments used to establish sensitivity to mechanical insult. It is a standard practice to compare the behavior of unfamiliar materials with those of PETN; PETN is considered to be either a relatively insensitive primary explosive, or one of the most sensitive secondary explosives, and is

9

thusly used to give a boundary between those two classes. PETN may be detonated by striking with a hammer on a hard steel surface, and is generally considered the least sensitive explosive with which this may be done. RDX is only slightly less sensitive to mechanical insult. By comparing the sensitivity of an explosive against the behavior of PETN, therefore, it may be determined whether or not the material can be classified as a primary or secondary explosive. This determination will impact the ability to safely handle the material, and give considerations on how this would be done. The second type of standards serves several purposes. The three homemade flash powders are stoichiometric mixtures of finely divided aluminum powder (Al) and potassium chlorate (Al + KClO3), potassium perchlorate (Al + KClO4) or a mix of the two (Al + KClO3 and KClO4). These materials are used to assure good detection of these important chemicals, which may be found in all the flash powder types of samples, to understand endothermic behavior in the thermal testing (as the oxidizers melt), to demonstrate the susceptibility to mechanical insult of sulfur-free flash powders, and to provide at least one sample that would analyze positively for chlorate. Other calibration verification standards were used in the chemical analysis and thermal testing. If those samples fell within appropriate limits, they are not discussed in this report. The primary objective of this work is to establish the relative sensitivity of each sub-sample as related to the chemistry of the material. Both the sensitivity to mechanical insult and the chemical composition were carefully evaluated, in comparison with the behavior of the standard materials and common recipes for amateur pyrotechnics production. Taken together, the measurements indicate that the samples provided are within the range of ordinary published formulations. 4.0 Experimental Methods and Procedures 4.1 Handling Precautions Fireworks components are known to be extremely sensitive to mechanical insult (i.e. impact, friction and electrostatic discharge). Flash powder, a mixture of finely divided metal powder and oxidizer, in particular is recognized by authors in the amateur pyrotechnics community, as being particularly dangerous: “The first rule of caution is to note that compositions are extremely hazardous when subjected to heat, friction, sparks, static electricity or a sharp blow. Mixing or manufacturing flash compositions is possibly more dangerous than attempting to manufacture black powder, improvised plastic or other nitrate type explosives.”4 Because flash powders are a component found in nearly every pyrotechnic device, all the samples were treated as a significant hazard. In spite of the limited amounts of material delivered as samples, an accident with any one of them could have resulted in disfiguring injuries for those involved. Therefore, we used all the normal safety precautions exercised in an explosives laboratory. The technicians performing the testing wore fireproof lab coats, laboratory glasses, nitrile gloves and grounding heel straps during the performance of this work. Additionally, when doing the sample processing, they were also wearing wrist grounding straps. When running the actual mechanical insult test series, they used hearing protection, in this case earplugs. No persons

10

uninvolved with the testing were permitted in the lab when the samples were not locked in storage. Normal safety precautions of banning spark-producing devices and cell phones from the lab were observed. The samples were stored in an ATF-approved explosives magazine. Chains of custody (included in the delivered materials) were utilized every time the samples were removed from the magazine, such that every usage of the material was documented. NCOI forms were signed by all technicians who took part in the program. A standard operating procedure including safety protocol and PPE requirements was written from the military standards and the samples were processed and tested for mechanical insult sensitivity at the ARA office in Panama City, FL. 4.2 Sample Preparation This section describes the preparation of all samples for each specific test. 4.2.1 Sample Preparation for Mechanical Insult Testing The samples with larger particle size distributions needed to be safely processed into a powder form prior to testing. The military standard specifies that the tests be performed on a particular sample quantity not possible on the large chunks present in some of the sub-samples. For the specimens not delivered as a fine powder, a processing technique was developed. To eliminate possible friction hazard, the process was performed on a plastic sheet over a paper towel, rather than on a metallic surface. This treatment provided an extra cushion that kept the applied impact to a minimum. Large sample particles were first cut into smaller pieces with a razor blade, and the resulting chunks crushed into a powder form with a non-sparking metal spatula. This process is shown in Figure 2 and the results in Figure 3. To keep the direct forces to a minimum, a small rolling action over the chunks generated a powder of more appropriate particle sizes. On every sample, this technique worked very well in producing a coarse powder (Figure 4). These powders, along with those samples that had arrived as powdered material, were submitted to the testing.

Figure 2. Photo of initial cutting procedure.

11

Figure 3. Initial processing of the larger samples; chopping with a razor blade.

Figure 4. Completely processed powder. 4.2.2 Sample Preparation for Chemical and Thermal Testing In preparations for SEM and EDAX, a small amount of the powder was removed from the container via spatula. Carbon tape was then lightly pressed against the powder, tapping off any loose power, leaving a thin monolayer of powder stuck to the tape. The carbon tape with the sample on it was then placed directly on the sample platform in the SEM. The carbon tape is composed largely of carbon and oxygen, and its use negates any information about these elements in the EDAX elemental composition data. The other reported elements come from calibrated signal channels. In the analysis of a single-phase, pure element, sample at 15 kV the smallest possible interaction volume is about 1 μm in diameter. Elements with atomic number higher than that of Na are well analyzed with this technique, and have detection limits in the range of 1/104 to 1/105. Actual interaction regions are slightly more diffuse with the real samples, which are heterogeneous in both composition and morphology. Regions where the electron beam is incident on the sample range from the very tightest focus (used to identify the composition of individual particles) to full-image (used to establish overall sample composition). Regions marked in some SEM images in the results section indicate the location of the interaction region, but not necessarily the size of the spot probed with EDAX. EDAX results are normally viewed as semi-quantitative, and are used in this work to establish presence or absence of certain materials, rather than the absolute concentration of them. Sample preparation for the ICP analysis consisted of 1 mg of sample being put into 10 ml of deionized water (DI). 1 ml of this slurry was then added to 10 ml of HNO3. Note that no sample

12

digestion was performed, as this data was viewed largely as a simple confirmation of EDAX results. In these results, scandium (Sc) was used as an internal standard, and several of the channels were not calibrated. This latter fact explains the presence of positive readings in the uranium channels, rather than the actual presence of uranium. Analysis of anions was performed by chromatographic techniques: Samples for the anion analyses were put into deionized water (DI), 0.25 g into 25 ml. Analyses were performed on filtered solution. No preservatives were used. IR spectroscopy was also used to analyze anions. This analysis was done with wetted samples largely to eliminate possible safety problems of squeezing the sample material between the sample holder and the pressure clamp. The sample holder allows the attenuated total reflectance to be measured through the sample. ATR-FTIR samples were generated by putting 1 mg of each sample into 10 ml of DI. This solution was thoroughly shaken and allowed to settle. 9 ml of liquid was removed, leaving behind a dense slurry of sample and DI. A disposable pipette was used to add 1 drop of the slurry to the diamond surface in the center of the metal sample holder on the FTIR and the IR tip was lowered onto the holder, pinning a thin layer of slurry between the tip and the holder. Blank backgrounds were collected prior to sample analyses. Thermal stability testing: Sample sizes of approximately 1 mg were directly put into sample pans and hermetically sealed before analysis in the differential scanning calorimeter (DSC). 4.3 Brief Test Descriptions of All Tests 4.3.1 Mechanical Insult Test – Impact. To establish sample sensitivities to initiation by impact, the Modified Bureau of Mines (MBOM) Impact test machine was used, shown in Figure

  1. MBOM Impact test machine creates high impact forces on energetic materials. The machine’s

impacting mass (2.5 kg) is dropped from programmable heights (up to 100 cm) before striking a sample situated on a steel anvil. The combined effects of impact and confinement ignite the material at heights that provide energy above the reactive threshold. Reaction of the material is determined by observation and/or examination of the sample residue. In order to determine the relative impact sensitivity, the “Bruceton” or “Stair-step” method of initiation threshold identification is performed. A 25 ± 5 mg sample of material is placed on 1 inch square 180 grit sandpaper in a small pile under the striker. The drop weight of 2.5 kg is set at the determined height. While observing the sample area, the drop weight is released via Figure 5. MBOM Impact Testing Machine

13

electromagnet. After recording the reaction as a “go” or “no go”, the drop weight is removed from the striker and the anvil and striker faces are cleaned. A “go” is determined by the operators observing smoke, flash, flame, sparks, or a loud report to differentiate it from regular machine noise. As per the “Bruceton” testing method, when a “go” is recorded, the operator sets the next test height to the next lower log interval. If a “no go” is recorded, the operator sets the next test height to the next higher log interval. The operator repeats this process 25 times. These numbers yield a H50%, or height where the sample will react 50% of the time. Calibration standards of RDX and PETN were run in this machine, and results well within the accepted limits of the military method were obtained. Testing was conducted in accordance with MIL- STD 1751A Method 1021.5 4.3.2 Mechanical insult test – Friction ARA used an Allegheny Ballistics Laboratory (ABL) Friction Test Apparatus for conducting these tests, shown in Figure 6. The apparatus delivers a sliding friction input into a small sample (nominally 10 mg) of test material. The primary parts of the test apparatus are a friction wheel that applies a load to the sample and a friction plate upon which the test sample is placed. An explosive sample is positioned on the friction plate; the friction wheel is lowered onto the sample at a pre-determined load, such that the sample is pinched between the plate and the wheel. The pendulum weight is raised to the 8 feet per second height and locked in place by an electromagnetic brake. When ready to test, the brake is released, and the pendulum weight impacts the friction plate causing it to slide rearwards. Initiation of the sample is determined by production of an audible pop, flame or smoke, as shown in Figure 7. This test simulates potential initiation of explosive that may be caught in mechanical parts, which could apply a pinch or sliding load on the explosive. Solids, liquids, or powders can be tested with this apparatus. Testing was conducted in accordance with MIL-STD 1751A Method 1021.5

Figure 6. ABL Friction Testing Machine Figure 7. ABL Friction Machine, showing a positive result

14

  1. 3.3 Electrostatic Discharge test

Total energy deposited in a human ESD event is reported to be tens of millijoules (mJ).6 Giving a safety factor of approximately 10x, any material initiated with discharges under 0.25 joules is normally classified as hazardous. Most explosives and pyrotechnics are hazardous to an electrostatically generated spark. A quantitative measure of sensitivity to spark is determined by the electrostatic discharge (ESD) test. The ABL ESD machine operates by generating an electric charge in a bank of capacitors across an electron gap at 5,000 VDC (Figure 8. Detail of electrode assembly of ESD testing machine.). The electric charge is discharged through a sample of the test material held on a grounded Teflon plate. The discharge point is a needle of specific design that is lowered toward the sample. As the distance between needle and the grounded plate narrows, the electricity arcs from the needle to the grounded plate. The electric arc passes through the test sample resulting in a reaction or non-reaction of the material. The whole apparatus is shown in Figure 9. The goal of the ESD test is to find the threshold of initiation level (TIL). This is the highest level of electrical energy (joules) at which 20 consecutive “no gos” are recorded. The operator places approximately 10 mgs of the test material on the platform. The appropriate capacitor is selected by the turn of two knobs and is charged to 5000 Vdc. The operator fires the machine and observes. If results are negative, i.e., no reaction, the test is continued until 20 consecutive “no-gos” are reported. If the test sample has a positive result, i.e., flash, spark, burn, odor, or noise other than instrument noise, then testing should be performed at the next lower level until 20 consecutive “no-gos” are reported. The final number is reported as number of “no gos” out of 20 at the tested power level; for example “0/20 “No Gos” @ 0.19 Joules.” 4.3.4 Scanning Electron Microscope – Energy Dispersive X-ray (SEM-EDAX) Analysis SEM is a type of high-magnification imaging in which the sample is scanned with a focused beam of electrons. These electrons typically interact with the sample material on an atomic level, yielding information about the material’s morphology (in the case of the fireworks samples, particle size and heterogeneity). Detection is performed through observation of an image of secondary electrons emitted from the sample after having been excited by the input Needle Sample Figure 8. Detail of electrode assembly of ESD testing machine. Figure 9. ABL Electrostatic Discharge Testing Machine.

15

beam. These images are not natively colored, because no light of visible wavelength is involved. The images are typically shown in black and white. When excited by the electron beam, X-rays characteristic of the atomic composition of the sample are also emitted, which forms the basis of the X-ray elemental analysis. The instrument was run under a relatively high-pressure and humidity environment, enabling imaging of materials sensitive to electrostatic discharge to be performed. 4.3.5 Inductively Coupled Plasma Atomic Emissions Spectroscopic (ICP-AES) Analysis

ICP-AES, also called ICP-optical emission spectrometry (ICP-OES) is a type of emission spectroscopy that uses a high-temperature plasma to excite atoms in a sample to highly excited states or to create ions. These excited or ionized atoms emit light at frequencies characteristic of their elemental composition. Detection of this light is used to determine the trace elements present in a sample. For this analysis, samples are typically dissolved or digested into an acidic aqueous matrix that is fed into the plasma torch through a nebulizer that sprays the matrix into the torch as an aerosol. Results are generated by comparing the amount of light produced at each of a number of wavelengths to those generated from a known amount of that same element from a standard. 4.3.6 Fourier Transform Infrared Spectroscopy (FTIR) Analysis In FTIR analysis, the absorbence of light in the IR region by the sample is measured. This type of instrument uses a broadband infrared source coupled with wavelength deconvolution with a Michelson interferometer to determine which molecular features are present from the sample. In the fireworks, FTIR is principally used for identification of anions in powdered salts, like the nitrate in potassium nitrate (NO3 -). The output spectra often has units of % transmission vs wavenumber. In this case, because of the sensitivity of the samples toward impact and friction, they were presented to this instrument dissolved in water. 4.3.6 Differential Scanning Calorimetry (DSC) Analysis Differential scanning calorimetry is a thermoanalytical technique in which the difference in the amount of heat required to increase the temperature of a sample and reference is measured as a function of temperature. Both the sample and reference are maintained at nearly the same temperature throughout the experiment. Generally, the temperature program for a DSC analysis is designed such that the sample holder temperature increases linearly as a function of time. The basic principle underlying this technique is that when the sample undergoes a physical transformation such as phase transitions, more or less heat will need to flow to it than the reference to maintain both at the same temperature. Whether less or more heat must flow to the sample depends on whether the process is exothermic or endothermic. Although the endothermic events result in remarkable data in this work, chiefly we are interested in exothermic behavior indicative of decomposition.

16

  1. 0 Data, Observations and Results

In this section, the results of the chemical composition testing will be presented sample by sample, and then compared with each sample’s sensitivity to initiation by mechanical insult. A small percentage of the data, mostly SEM images, are presented here to guide the reader. The section is organized into two tables of overall results. Table 2 is organized by sample name. Table 3 presents the same information broken down by sample type. Following the tables, each individual material is addressed. The results section for each material is structured into a description of the sample, both visual and SEM. The EDAX results are related to the SEM image, and here the overall composition is given, rather than the composition of individual particles, unless they are exceptional. Many other SEM-EDAX results are available on each material in the Appendix. Because of the heterogeneity of the powders, the EDAX should be considered a semi-quantitative measurement, a sort of overall average of the material seen in the SEM image. As previously mentioned, although oxygen and carbon values are given in the EDAX results, these numbers are probably not useful, because of the contribution of these signals from the tape used to present the sample to the testing. ICP data given in this section is largely a “presence or absence” measurement, a correlative study looking for agreement with the EDAX work. The samples were not digested prior to the testing, and therefore materials not soluble in water will appear only weakly, or not at all. However, in every case, good agreement was established between the elemental composition data from the EDAX and the ICP. FTIR and chromatographic analysis used to determine anions were also a correlative pair. In this case, the primary measurement was IC (for chlorate and nitrate) and LCMS (for perchlorate). These should also be considered semi-quantitative results, because of the small amount of material used to create the slurry for testing (FTIR) and the filtered solution used in the chromatographic analyses. It is unknown if sample heterogeneity can be adequately represented by samples as small as those we received The chief result from thermal testing is the decomposition temperature of small quantities of sample material. The testing takes the sample from room temperature to 500 °C at a rate of 20 °C per minute. Interesting data is also obtained from lower temperature endotherms where chemical components of the sample undergo crystal rearrangement or melt. These exact temperatures vary with sample particle size, and also the presence of the other components in the sample matrix. DSC thermograms are shown on only a few of the individual sample descriptions, in order to save space. All the others are available in the Appendix. The mechanical insult testing yields a value for each type of possible initiation; impact, friction and electrostatic discharge. These values are used to compare the behavior of the sample with those of the standards, in order to classify the samples as more (or less) dangerous to handle than military explosives that are often considered the least reactive primary explosives (PETN and RDX). A non-detect (ND) is reported if the sample is not sensitive to that particular stimulus. Results ordered by sample name are given in Table 2. Results that have been presented by type of material are shown in Table 3.

17

Table 2. Compiled Results of Testing by Sample Name Name of sample Physical Description Impact (H50%) Friction (F50%) ESD (joules) Major cations Major anions Sulfur %/wt Thermal decomp onset Units

cm psi 0/20 at

°C O-Triple C #A fine gray sparkly powder 62 9 0.063 Mg, Al, K, Ti

ClO4

  1. 5
500

O-Triple C #B small black pebbles ND ND 0.25 K

NO3

5-32 365 O-Triple C #C "BB" size round silver/gray balls 12 13 0.063 Mg, Al, K, Ti ClO4 -,

NO3

4-30 355 Sky Festival #A large gray pellets w/ black & brown crumbs 22 9 0.063 Mg, Al, K, Cu

ClO4

14 361 Sky Festival #B large gray pellets w/ black & brown crumbs 14 15 0.025 Mg, Al, K, Sr, Ca

ClO4

  1. 2
500

Sky Festival #C fine gray sparkly powder ND 9 0.025 Mg, Al, K

ClO4

ND

500

Sky Festival #D fine gray sparkly powder ND 9 0.025 Mg, Al, K, P Ca, Si, Fe

ClO4

ND

500

Sky Festival #E black particles, about 0 .5 mm across with copper colored dust ND ND 0.63 K

NO3

14 Not tested Sky Festival #F copper colored powder with black particles Not tested Not tested Not tested K, Si, Al and Fe

NO3

ND Not tested Sky Festival #G grayish coarse powder 20 9 0.25 Al, Mg, Sr, K

ClO4

  1. 7

Not tested Halawa #A small black pebbles ND ND 0.063 K

NO3

8 363 Halawa #B fine gray powder, with larger chunks 50 9 0.013 Mg, Al, K, Ti, Si

ClO4

  1. 4
500

18

Name of sample Physical Description Impact (H50%) Friction (F50%) ESD (joules) Major cations Major anions Sulfur %/wt Thermal decomp onset Units

cm psi 0/20 at

°C Halawa #C fine gray powder 72 9 0.063 Mg, Al, K, Ti

ClO4

4-13

500 Krazy Kids #A small black pebbles ND ND 0.25 K, Al

NO3

10 363 Krazy Kids #B 1 cm x 0.75 cm size silver/gray "pellets" 28 265 0.063 K, Al, Ba ClO4 -,

NO3

12 354 Krazy Kids #C 1 cm x 0.75 cm size silver/gray "pellets" 23 134 0.13 Mg, Al, K, Sr, Ca ClO4 -,

NO3

7

353 KP/Al fine gray powder 60 77 0.013 Al, K

ClO4

ND Not tested KC/Al fine gray powder 71 71 0.013 Al, K

ClO3

ND Not tested KP/KC/Al fine gray powder 55 77 0.013 Al, K ClO4 -,

ClO3

ND

500

RDX fine white powder 19 11 0.063 Not tested Not tested Not tested Not tested PETN fine white powder 12 13 0.063 Not tested Not tested Not tested Not tested

19

Table 3. Results segregated by sample type Name of sample Physical Description Impact (H50%) Friction (F50%) ESD (joules) Major cations Major anions Sulfur Thermal decomp onset Units

cm psi 0/20 at

°C

Flash powders without sulfur do not thermally decompose < 500 °C

O-Triple C #A fine gray sparkly powder 62 9 0.063 Mg, Al, K, Ti

ClO4

  1. 5
500

Sky Festival #C fine gray sparkly powder ND 9 0.025 Mg, Al, K

ClO4

ND

500

Sky Festival #D fine gray sparkly powder ND 9 0.025 Mg, Al, K, Ca, Si, Fe, P

ClO4

ND

500

Halawa #B fine gray powder, with larger chunks 50 9 0.013 Mg, Al, K, Ti, Si

ClO4

  1. 4
500

Halawa #C fine gray powder 72 9 0.063 Mg, Al, K, Ti

ClO4

4-13

500

KP/Al fine gray powder, standard 60 77 0.013 Al, K

ClO4

ND Not tested KC/Al fine gray powder, standard 71 71 0.013 Al, K

ClO3

ND Not tested KP/KC/Al fine gray powder, standard 55 77 0.013 Al, K ClO4 -,

ClO3

ND

500

Lift charges (black powders) are not sensitive to impact or friction.

Halawa #A small black pebbles ND ND 0.063 K

NO3

8 363

20

Name of sample Physical Description Impact (H50%) Friction (F50%) ESD (joules) Major cations Major anions Sulfur Thermal decomp onset Units

cm psi 0/20 at

°C O-Triple C #B small black pebbles ND ND 0.25 K

NO3

5-32 365 Krazy Kids #A small black pebbles ND ND 0.25 K, Al

NO3

10 363 Sky Festival #E black particles, about 0 .5 mm across with copper colored dust ND ND 0.63 K

NO3

14 Not tested

“Stars” and “comets” - sulfur usually sensitizes flash powder to both mechanical insult and thermal decomposition.

O-Triple C #C "BB" size round silver/gray balls 12 13 0.063 Mg, Al, K, Ti ClO4 -,

NO3

4-30 355 Sky Festival #A large gray pellets w/ black & brown crumbs 22 9 0.063

Mg, Al, K, Cu ClO4

14 361 Sky Festival #B large gray pellets w/ black & brown crumbs 14 15 0.025 Mg, Al, K, Sr, Ca

ClO4

  1. 2
500

Sky Festival #G grayish coarse powder 20 9 0.25 Al, Mg, K, Sr

ClO4

  1. 7

Not tested Krazy Kids #B 1 cm x 0.75 cm size silver/gray "pellets" 28 265 0.063 K, Al, Ba ClO4 -,

NO3

12 354 Krazy Kids #C 1 cm x 0.75 cm size silver/gray "pellets" 23 134 0.13 Mg, Al, K, Sr, Ca ClO4 -,

NO3

7 353

The following sample appears to be pyrotechnic clay, used to separate sections and guide gas emission.

Sky Festival #F copper colored powder with black particles Not tested Not tested Not tested K, Si, Al and Fe

NO3

ND Not tested

21

Name of sample Physical Description Impact (H50%) Friction (F50%) ESD (joules) Major cations Major anions Sulfur Thermal decomp onset Units

cm psi 0/20 at

°C

These samples are calibration samples for the mechanical insult testing machines.

RDX fine white powder 19 11 0.063 Not tested Not tested Not tested Not tested PETN fine white powder 12 13 0.063 Not tested Not tested Not tested Not tested

22

  1. 1 O-Triple-C Results
  2. 1.1 Sample O-Triple-C, Sub-sample A

This sample is a silvery gray powder that contains white flakes (0.2 - 0.5 mm in length). 5.157 g of this material was delivered. These white flakes are easily seen in an enlarged version of the optical photograph, Figure 10, and even more so in the 40x magnified SEM image (Figure 11). These white flakes are present in a matrix of darker pellets. The appearance is similar to that of the flash powder standards.

Figure 10. Enlarged photograph of O-Triple-C, A.

Figure 11. 40x SEM image of O-Triple-C, A. The SEM-EDAX analysis of O-Triple-C A is shown below ( Figure 12). The top composition analysis was performed on the wide particle that takes up most of the micrograph. This particle is composed of titanium, with hints of other metal particles. Titanium is used in fireworks to make bright whitish sparks, and magnesium and aluminum are also common components of flash powders. The smaller particles that appear darker in the micrograph are heavily laden with chlorine, making up the other chief component of common flash powders, the oxidizer component. The chlorine in the sample was found as perchlorate, observed in both FTIR and LC/MS data. No chlorate or nitrate anions were observed. The ICP data confirms the presence of K (likely the cation associated with the perchlorate), Mg and Al, but does not find Ti. This is due to the insolubility of the metal particles in the light acid treatment used to dissolve the sample in water for introduction to the ICP. Chemical composition shows this sample appears to be a flash

23

powder, with some additional metal dust that may serve to make streamers in the final pyrotechnic product. This sample is quite sensitive to various forms of mechanical insult, as is discussed in the section on mechanical insult below, but does not decompose when heated, as shown by DSC results.

Figure 12 . SEM image and two EDAX spectra of O-Triple-C, A. The arrows point to the source of the EDAX signals Figure 12. SEM and EDAX data of O-Triple-C, A.

24

Figure 13. DSC results for O-Triple-C, A, showing no thermal decomposition below 500 degrees C.

Data Summary of O-Triple-C A:

Mechanical Insult Data  Impact (H50%) – 62 cm  Friction (F50%) – 9 psi  ESD (Joules) – 0.063 J

Primary Chemical Results  Predominant metals (EDAX) – Mg, Al, K and flakes of Ti  Predominant metals (ICP-AES) – Mg, Al, K  Anion(s) – perchlorate  Other species – S (2.5%/wt) Thermal Sensitivity Data  DSC exotherm – NA  Other DSC features – endotherms at 112 and 305 °C indicate sulfur melting point or loss of water and KClO4 crystal phase transition, respectively. The endotherm at 455 °C may be related to sulfur volatilization (reported to boil at 444.6 °C) This material is a flash powder, having a normal composition compared to recipes on amateur fireworks websites given the data obtained during the testing. As such, it is very sensitive to initiation by ESD and frictional forces.

25

  1. 1.2 Sample O-Triple-C, Sub-sample B

This sample is composed of black pebbled material, as shown in an enlarged photograph in Figure 14. 8.294 g of this material was delivered. It has the overall appearance of black powder and there were pieces of fuse material delivered with the sample. The fuse material was not analyzed.

Figure 14. Enlarged photo of O-Triple-C, B. SEM shows it to be composed of large particles, and EDAX (Figure 15) taken across the entire field of view demonstrates that it is free of any chlorine compound, a result that is mirrored in both the FTIR and the anion (IC) analytical data. Instead, this sample contains nitrate, which is most likely the counter-ion to the potassium, and sulfur. Black powder has the general recipe of potassium nitrate (KNO3), sulfur and charcoal, which mirrors the composition found in this sample. ICP analysis verifies the presence of the potassium and the absence of any meaningful amount of any other metals.

Figure 15. SEM and EDAX data, O-Triple-C B. EDAX results collected from white regions in the SEM image result in a heavier potassium signal but not chlorine, which likely indicates that the white regions in the image are KNO3 crystals. Additionally, EDAX results from the grayish portions of the SEM image (as distinct from the smaller black particles) are even heavier on the potassium signal. The sulfur peak is smaller, perhaps indicating a lack of sulfur in the light smoother grayish places on the image.

26

This sample is quite heterogeneous, which is related to the wide range of sulfur measurements received in EDAX results. There was no “large area” EDAX taken for this particular sample, and therefore the range of the sulfur results is reported, rather than one that is representative of the sample as a whole. DSC results indicate that this sample begins to decompose when heated past 365 °C.

Figure 16. DSC data from O-Triple-C, B. Sample decomposition onset at 365 degrees C. Data Summary of O-Triple-C B:

Mechanical Insult Data  Impact (H50%) – No initiation observed  Friction (F50%) – No initiation observed  ESD (Joules) – 0.25 J Primary Chemical Results  Predominant metals (EDAX) – K  Predominant metals (ICP-AES) – K  Anion(s) – nitrate  Other species – sulfur (5-32%/wt) Thermal Sensitivity Data  DSC exotherm with onset at 365 and peaking at 437 °C is indicative of decomposition  Other DSC features – endotherm at 132 °C is likely a KNO3 (α to β) crystalline phase change. The endotherm at 330 °C is KNO3 melting. This sample appears from the presented data to be a lift charge; a variety of black powder. As such, it is less sensitive to initiation by mechanical forces than the flash powder samples that were analyzed.

27

  1. 1.3 O-Triple-C, Sub-sample C

This sample is composed of grayish powder and larger gray chunks. 10.241 g of this material was delivered. This sample is composed of a silvery gray powder and round gray balls a few mm in diameter. Figure 17 is an enlarged photograph of the sample material in a Velostat container. The larger particles were processed into powder with a razor blade at the time of the mechanical insult testing, and this prepared sample was also used to acquire SEM and EDAX data (Figure 18).

Figure 17. Enlarged photo of O-Triple-C, C.

Figure 18. SEM and EDAX data for O-Triple-C, C. EDAX on the entire region of the SEM image is dominated by metal powders (Al and Mg) and sulfur. Potassium is also present. The composition of metals is confirmed in the ICP data. Chlorine is also extant, as perchlorate, indicated in the anion analysis (LC/MS) and FTIR spectrum. Nitrate is present in a smaller quantity (seen in LC/MS data). EDAX analysis of the large white spade-shaped particle in the Figure 18 image yields a very high concentration of titanium. This sample is quite heterogeneous, which is related to the wide range of sulfur measurements received in EDAX results. There was no “large area” EDAX taken for this particular sample,

28

and therefore the range of the sulfur results is reported, rather than one that is representative of the sample as a whole. DSC results indicate that this sample begins to decompose when heated past 355 °C. Data Summary of O-Triple-C C:

Mechanical Insult Data

 Impact (H50%) – 12 cm  Friction (F50%) – 13 psi  ESD (Joules) – 0.063 J

Primary Chemical Results

 Predominant metals (EDAX) – Mg, Al, K and flakes of Ti  Predominant metals (ICP-AES) – Mg, Al, K  Anion(s) – perchlorate, smaller quantity of nitrate  Other species – sulfur (4-30%/wt)

Thermal Sensitivity Data  DSC exotherm with onset at 355 °C and peaking 403 °C is indicative of decomposition  Other DSC features – endotherm at 305 °C indicates a KClO4 crystal phase transition. This material appears to be pyrotechnic “star” or “comet” material, which is flash powder mixed with sulfur and various materials to cause the chunks to adhere together. Sulfur is a known sensitizer of flash powder, causing even higher degrees of sensitivity to initiation by mechanical insult, as well as to thermal decomposition. This sensitization is clearly observable in the data from this material. Even so, sulfur is a common component of pyrotechnic material and its presence is no way indicative of special compounding. 5.2 Sky Festival Samples 5.2.1. Sky Festival Sub-sample A 2.473 g of this material was delivered. It is composed of large gray pellets intermixed with smaller black and brown particulate. This material was processed into smaller particles for testing. These larger chunks are probably “stars” or “comets.” An enlarged photo of this material is shown in Figure 19.

29

Figure 19. Enlarged photo of Sky Festival A sample. This sample was found to be as sensitive to initiation by mechanical insult and ESD as the other flash powder-type samples. X-ray analysis (Figure 20) yields a composition very similar to the O-Triple-C C sample, which was delivered with similar physical appearance, having peaks associated with sulfur, chlorine, potassium, magnesium and aluminum. The presence of these components is confirmed in the ICP data and in LC/MS data, which indicates a high concentration of perchlorate. Both EDAX and ICP data show copper and chromium, likely coloring agents for the pyrotechnic materials. DSC results indicate that this sample begins to decompose when heated past 361 °C.

Figure 20. SEM and EDAX data of Sky Festival A. Data Summary of Sky Festival A:

Mechanical Insult Data

 Impact (H50%) – 22 cm  Friction (F50%) – 9 psi  ESD (Joules) – 0.063 J

Primary Chemical Results

 Predominant metals (EDAX) – Mg, Al, K with smaller amounts of Cu

30

 Predominant metals (ICP-AES) – Mg, Al, K, small amounts of Cu and Cr  Anion(s) – perchlorate  Other species – sulfur (14%/wt)

Thermal Sensitivity Data  DSC exotherm with onset at 361 and peaking at 411 °C  Other DSC features – endotherm at 305 °C indicates a KClO4 crystal phase transition. 5.2.2. Sky Festival Sub-sample B Sample B is also composed of large gray pellets intermixed with small black and brown particles. 2.482 g of this material was delivered. This material was processed into smaller particles for testing. These larger chunks are likely to serve as “stars” or “comets” when built into a pyrotechnic device. An enlarged photo of the material is shown in Figure 21.

Figure 21. Enlarged photo of Sky Festival B. This sample was found to be as sensitive to initiation by mechanical insult as the other sulfur- laden flash powder-type samples. X-ray analysis (Figure 22) yields a composition very similar to the Sky Festival A sample, having peaks associated with sulfur, chlorine, potassium, magnesium and aluminum. The presence of these components is confirmed in the ICP data and in IC/MS data, which indicates a high concentration of perchlorate. Both EDAX and ICP data show strontium, likely a coloring agent for the materials. The material also contains calcium, found in both EDAX and ICP data. DSC results indicate that this sample does not decompose at temperatures less than 500 °C.

31

Figure 22. SEM and EDAX data for Sky Festival B sample. Data Summary of Sky Festival B:

Mechanical Insult Data

 Impact (H50%) – 14 cm  Friction (F50%) – 15 psi  ESD (Joules) – 0.025 J

Primary Chemical Results

 Predominant metals (EDAX) – Mg, Al, K, Sr and Ca  Predominant metals (ICP-AES) – Mg, Al, K, Sr and Ca  Anion(s) – perchlorate  Other species – sulfur (1.2%/wt)

Thermal Sensitivity Data  DSC exotherm – NA  Other DSC features – endotherm and subsequent perturbation at and above 305 °C probably indicates a KClO4 crystal phase transition.

  1. 2.3. Sky Festival Sub-sample C
  2. 679 g of this material was delivered. This sample is a fine silvery powder, as shown in Figure
  3. SEM and EDAX data are shown in Figure 24. The X-ray data shown represents the entire

SEM image. The white particle in the box is nearly pure titanium, and the grayish particle is nearly completely aluminum.

32

Figure 23. Enlargement of photo of Sky Festival Sub-sample C. X-ray analysis indicates that the material is composed of magnesium and aluminum, potassium and chlorine. Small quantities of titanium are also present. There is no sulfur in this sample, and LC/MS and FTIR show that the chlorine is present as the perchlorate anion. This sample is appreciably less sensitive to initiation by impact than many of the other flash powder-like samples, perhaps because of the lack of sensitization by sulfur. DSC results indicate that this sample does not decompose at temperatures less than 500 °C.

Figure 24. The EDAX analysis on this slide is of the whole image.

Data Summary of Sky Festival C:

Mechanical Insult Data

 Impact (H50%) – Initiation not observed.  Friction (F50%) – 9 psi  ESD (Joules) – 0.025 J

Primary Chemical Results

 Predominant metals (EDAX) – Mg, Al, K

33

 Predominant metals (ICP-AES) – Mg, Al, K  Anion(s) – perchlorate  Other species – NA

Thermal Sensitivity Data  DSC exotherm – NA  Other DSC features – endotherm at 305 °C indicates a KClO4 crystal phase transition. 5.2.4. Sky Festival Sub-sample D This sample is another fine grayish powder, as shown in Figure 25. 5.063 g of this material was delivered. The SEM-EDAX data (Figure 26) of this sample shows a similar composition to Sky Festival C, except that one of the larger particles interrogated by the x-rays contains a large concentration of phosphorus. This signal is quite localized, not being visible in the x-ray signatures of the sample as a whole, and entirely missing from the ICP data. Potassium, aluminum and magnesium are present in large concentrations. This sample has a wide array of cations present in minor quantities, including calcium, silicon and iron. The only anion present in appreciable quantities is perchlorate, as reported by both FTIR and IC/MS. DSC results indicate that this sample does not decompose at temperatures less than 500 °C.

Figure 25. Enlarged photo of Sky Festival sample D.

34

Figure 26. SEM and EDAX data on Sky Festival D, note the predominance of the P peak.

Figure 27. SEM and EDAX data on Sky Festival D. Data Summary of Sky Festival D:

Mechanical Insult Data

 Impact (H50%) – Initiation not observed.  Friction (F50%) – 9 psi  ESD (Joules) – 0.025 J

Primary Chemical Results

 Predominant metals (EDAX) – Mg, Al, K, Ca, Si, Fe  Predominant metals (ICP-AES) – Mg, Al, K, Ca, Si, Fe  Anion(s) – perchlorate  Other species – P

35

Thermal Sensitivity Data  DSC exotherm – NA  Other DSC features – endotherm at 305 °C indicates a KClO4 crystal phase transition.

  1. 2.5. Sky Festival Sub-sample E
  2. 181 g of this sample was received. The sample is composed of coarse black particles, about
  3. 5 mm across. This material has x-ray signatures associated with black powder, potassium and

sulfur dominating. Insufficient sample quantity was delivered to perform all analyses on this sample, but it was submitted to SEM-EDAX, chromatography and mechanical insult testing.

Figure 28. Enlarged photo of Sky Festival E

Figure 29. SEM image of Sky Festival E, scale on bottom

36

Data Summary of Sky Festival E:

Mechanical Insult Data

 Impact (H50%) – Initiation not observed.  Friction (F50%) – Initiation not observed.  ESD (Joules) – 0.63 J

Primary Chemical Results

 Predominant metals (EDAX) – K and small amounts of other materials  Predominant metals (ICP-AES) – Not performed  Anion(s) – nitrate only  Other species – S (14%/wt)

Thermal Sensitivity Data  DSC exotherm – not performed  Other DSC features – not performed 5.2.6. Sky Festival Sub-sample F 0.714 g of this material was delivered. This was a generally copper colored powder with some black particles present. Elementally, the particles show a fairly homogenous make-up. Again, the powder was course grained, as shown in Figure 31. EDS shows the black particles as predominantly Si and Al, with Fe present, as shown in Figure 30. The copper colored particles have a similar elemental make-up. The use of the carbon tape to secure the samples to the stage in the instrument makes the C and O signals difficult to interpret, but judging from the rest of the x-ray data, this material is an alumino-silicate clay, sometimes used for creating gas nozzles and separating stages from one another. Due to the very small quantity of material received, only peremptory mechanical insult testing was done. There appeared to be no sensitivity to any stimulus in these tests. Anion analysis yielded a nitrate signal only. Figure 30. EDAX results of Sky Festival E, S and K dominating

37

Figure 31. Enlarged photo of Sky Festival F

Figure 32. SEM image of Sky Festival F, showing texture of black

particle

Data Summary of Sky Festival F:

Mechanical Insult Data

 Impact (H50%) – TIL not tested, appears to be unreactive  Friction (F50%) – TIL not tested, appears to be unreactive  ESD (Joules) – Not tested.

Primary Chemical Results

 Predominant metals (EDAX) – Al and Si, Fe, small amounts of K  Predominant metals (ICP-AES) – Not performed  Anion(s) – nitrate only  Other species – NA

Thermal Sensitivity Data Figure 33. EDAX results of Sky Festival F, showing a clay-like composition

38

 DSC exotherm – not performed  Other DSC features – not performed

  1. 2.7. Sky Festival Sub-sample G

This was a grayish, course grained powder (Figure 34 and Figure 35). EDAX composition shows the presence of S, Al, Mg and Sr, as shown in x-ray spectra presented in Figure 36. 1.858 g of this material was received. “Small ‘Comet’ Tube Lift Charge Sample” was written on the sample bag. The material as delivered had two pieces of fusing in it. This material was received also in very small quantity, so SEM-EDAX, chromatography and mechanical insult were the only tests performed on this material.

Figure 35. SEM image of Sky Festival G sample

Figure 36. EDAX results of Sky Festival G sample

Figure 34. Photo of Sky Festival G sample

39

Data Summary of Sky Festival G:

Mechanical Insult Data

 Impact (H50%) – 20 cm  Friction (F50%) – 9 psi  ESD (Joules) – 0.25 J

Primary Chemical Results

 Predominant metals (EDAX) – Mg, Al, K, and Sr  Predominant metals (ICP-AES) – not performed  Anion(s) – perchlorate  Other species – sulfur (1.7%/wt)

Thermal Sensitivity Data  DSC – not performed 5.3 Halawa Samples 5.3.1. Halawa Sample A This sample is composed of black pebbles, with brown granules. 6.680 g of this material was received, “Lift charge” was written on the sample bag. It is similar in appearance to the O Triple C B sample, save that it contains no fuse-type material. Figure 37 contains an enlarged photo of the sample in a Velostat container.

Figure 37. Enlarged photo of Halawa sample A. SEM and EDAX data for this sample is shown in Figure 38 which is dominated by potassium and sulfur signals. Chlorine is completely absent from the X-ray data. ICP analysis verifies the dominance of K and S, and also the lack of aluminum and magnesium. The sole anion identified by both FTIR and IC/MS is nitrate.

DSC results indicate that this sample begins to decompose when heated past 363 °C

40

Data Summary of Halawa A:

Mechanical Insult Data

 Impact (H50%) – Initiation not observed  Friction (F50%) – Initiation not observed  ESD (Joules) – 0.063 J

Primary Chemical Results

 Predominant metals (EDAX) – K  Predominant metals (ICP-AES) – K  Anion(s) – nitrate  Other species – S (8%/wt)

Thermal Sensitivity Data  DSC exotherm with onset at 363 and peaking at 433 °C is indicative of decomposition  Other DSC features – endotherm at 134 °C is likely the KNO3 (α to β) crystalline phase change. The endotherm at 332 °C is KNO3 melting.

  1. 3.2. Halawa Sample B

This sample is a fine gray powder containing larger gray chunks. 5.656 g of this material was received. An enlarged photograph of the sample in a Velostat container is shown in Figure 39. The chunks in this material are not as regular as in other similar samples. The SEM and EDAX data for this material is shown in Figure 40, which has an x-ray spectrum similar to that of the other flash powder samples, consisting of powdered aluminum and magnesium, chlorine and potassium and titanium. There is also a smaller concentration of silicon. These materials are Figure 38. SEM and EDAX data for Halawa sample A.

41

also identified in the ICP data. The sole anion identified by both LC/MS and FTIR is perchlorate. DSC results indicate that this sample does not decompose at temperatures less than 500 °C.

Figure 39. Enlarged photo of Halawa sample B

Figure 40. SEM and EDAX data for Halawa sample B

Data Summary of Halawa B:

Mechanical Insult Data

 Impact (H50%) – 50 cm  Friction (F50%) – 9 psi  ESD (Joules) – 0.013 J

Primary Chemical Results

 Predominant metals (EDAX) – Mg, Al, S, K, Ti, Si  Predominant metals (ICP-AES) – Mg, Al, K, Ti, Si  Anion(s) – perchlorate

42

 Other species – S (2.4%/wt)

Thermal Sensitivity Data  DSC exotherm – NA  Other DSC features – endotherm at 113 °C is likely loss of moisture, at 305 °C, the endotherm is likely KClO4 phase transition.

  1. 3.3. Halawa Sample C

This sample is another finely divided gray powder. 5.706 g of this material was received. A photo is provided in Figure 41. SEM and EDAX data is presented in Figure 42. The x-ray spectrum is very similar to the preceding sample, showing high concentrations of magnesium and aluminum, sulfur and chlorine. There are smaller amounts of potassium and titanium. These results are corroborated by the ICP analysis except that the sulfur is not seen in those data (the detection limits for S in ICP are quite high, so this is not a concern). The only anion observed in the data in any abundance is perchlorate. This sample is quite heterogeneous, which is related to the wide range of sulfur measurements received in EDAX results. There was no “large area” EDAX taken for this particular sample, and therefore the range of the sulfur results is reported, rather than one that is representative of the sample as a whole. DSC results indicate that this sample does not decompose at temperatures less than 500 °C.

Figure 41. Enlarged photo of Halawa C sample.

43

Figure 42. SEM and EDAX data for Halawa C sample. Data Summary of Halawa C:

Mechanical Insult Data

 Impact (H50%) – 72 cm  Friction (F50%) – 9 psi  ESD (Joules) – 0.063 J

Primary Chemical Results

 Predominant metals (EDAX) – Mg, Al, K, Ti  Predominant metals (ICP-AES) – Mg, Al, K, Ti  Anion(s) – perchlorate  Other species – sulfur (4-13%/wt)

Thermal Sensitivity Data  DSC exotherm – NA  Other DSC features – endotherm at 113 °C is either loss of moisture or melting of the small amount of sulfur in the sample. The endotherm at 305 °C, the endotherm is likely KClO4 phase transition.

  1. 4 Krazy Kids Samples
  2. 4.1. Krazy Kids Sample A

This sample is shown in an enlarged optical photograph in Figure 43. 8.178 g of this material was received, written on the sample bag were the words “Lift, 2 Charges BSP.” It has the overall appearance of lift charge material, “black powder,” and there were pieces of fuse material delivered with the sample. SEM (Figure 44) shows it to be composed of very large particles, and

44

EDAX taken across the entire field of view demonstrates that it is free of any chlorine compound, a result that is mirrored in both the FTIR and the anion (IC) analytical data. Instead, this sample contains nitrate, which is most likely the counter-ion to the potassium, and sulfur. ICP analysis verifies the presence of the potassium and the absence of any meaningful amount of any other metals. X-ray data indicates a small quantity of aluminum, possibly a local contaminant, since the ICP-OES analysis does not contain Al signals. DSC results indicate that this sample decomposes when heated above 363 °C.

Figure 43. Enlarged photo of Krazy Kids sample A.

Figure 44. SEM and EDAX data of Krazy Kids sample A. Data Summary of Krazy Kids A:

Mechanical Insult Data

 Impact (H50%) – Initiation not observed  Friction (F50%) – Initiation not observed  ESD (Joules) – 0.25 J

45

Primary Chemical Results

 Predominant metals (EDAX) – K, small peak associated with Al  Predominant metals (ICP-AES) – K  Anion(s) – nitrate  Other species – sulfur (10%/wt) Thermal Sensitivity Data  DSC exotherm with onset at 363 and peaking at 429 °C is indicative of decomposition; the appearance of an exotherm at 321 °C in one test has not been identified.  Other DSC features – endotherm at 134 °C is likely the KNO3 (α to β) crystalline phase change. The endotherm at 332 °C is KNO3 melting. 5.4.2. Krazy Kids Sample B 11.248 g of this sample was received. This sample is composed of a silvery gray powder and cylindrical gray pellets about 1 cm tall x 0.75 cm wide. Figure 45 is an enlarged optical photograph of the sample material in a Velostat container. The larger roundish particles were cut into powder with a razor blade at the time of the mechanical insult testing, and this prepared sampled was used to acquire SEM and EDAX data (Figure 46).

Figure 45. Enlarged photo of Krazy Kids sample B. The SEM and EDAX data show small peaks associated with aluminum and magnesium, larger ones that are characteristic of potassium and sulfur, and several features related to barium, an element usually used to create color in pyrotechnics. The barium signals are related to the white speckles in the SEM image, the darker material is devoid of this element, and the sulfur and potassium features dominate. This sample is unique in the test set in that there are two anionic species associated with it, nitrate and perchlorate. This is less obvious in the FTIR data than the aqueous laboratory work-up. DSC results indicate that this sample decomposes when heated above 354 °C.

46

Figure 46. SEM and EDAX data of white regions of Krazy Kids sample B, Ba peaks dominating. As we discussed in the initial description of samples, many star and comet recipes available on the internet have both nitrate and perchlorate in them. Data Summary of Krazy Kids B:

Mechanical Insult Data

 Impact (H50%) – 28 cm  Friction (F50%) – 265 psi  ESD (Joules) – 0.063 J

Primary Chemical Results

 Predominant metals (EDAX) – K, small peak associated with Al, lots of Ba  Predominant metals (ICP-AES) – K, Al (looks higher in the ICP than the EDAX), lots of Ba  Anion(s) – nitrate and perchlorate  Other species – S (12%/wt)

Thermal Sensitivity Data  DSC exotherm with onset at 354 and peaking at 439 °C is indicative of decomposition.  Other DSC features – endotherm at 113 °C is either loss of moisture or melting of the small amount of sulfur in the sample. The endotherm at 320 °C is likely KClO4 phase transition.

47

  1. 4.3. Krazy Kids Sample C
  2. 293 g of this sample was received. This sample is composed

of grayish powder and larger gray chunks. This sample is composed of a silvery gray powder and cylindrical gray pellets about the twice the size of BBs (dimensions approximately 1 cm tall x 0.75 cm wide). Figure 47 is an enlarged optical photograph of the sample material in a Velostat container. The larger cylindrical-shaped particles were cut into powder with a razor blade at the time of the mechanical insult testing, and this prepared sampled was used to acquire SEM and EDAX data (Figure 48). Figure 47. Enlarged photo of Krazy Kids sample C.

Figure 48. SEM and EDAX data of Krazy Kids sample C. X-ray data from this sample indicates classic flash powder components with strontium used as a colorant. ICP-AES corroborates the presence of aluminum, calcium, potassium, magnesium, sulfur and strontium. FTIR shows both nitrate and perchlorate, in agreement with LC/MS. DSC results indicate that this sample decomposes when heated above 353 °C. Data Summary of Krazy Kids C:

Mechanical Insult Data

 Impact (H50%) – 23 cm  Friction (F50%) – 134 psi  ESD (Joules) – 0.13 J

Primary Chemical Results

 Predominant metals (EDAX) – Mg, Al, K, Sr

48

 Predominant metals (ICP-AES) – Mg, Al, K, Sr, Ca  Anion(s) – nitrate and perchlorate  Other species – sulfur (7%/wt) Thermal Sensitivity Data  DSC exotherm with onset at 353 and peaking at 439 °C is indicative of decomposition. The small exotherm peaking at 300 °C in one test has not yet been identified.  Other DSC features – endotherm at 116 °C is either loss of moisture or melting of the small amount of sulfur in the sample. The endotherm at 300 °C is likely KClO4 phase transition. 5.5 Standards 5.5.1. Potassium chlorate and aluminum homemade flash powder This standard was made by mixing 1.38 grams of atomized aluminum powder with 0.62 grams of potassium chlorate. The two components were mixed by hand for approximately 10 minutes before being submitted to testing. Data Summary of KClO3 and Al standard:

Mechanical Insult Data

 Impact (H50%) – 71 cm  Friction (F50%) – 71 psi  ESD (Joules) – 0.013 J

Primary Chemical Results

 Predominant metals (EDAX) –Al, K, Cl  Predominant metals (ICP-AES) – Al and K  Anion(s) – chlorate and perchlorate, some question about the purity of this standard. Discussions with Test America yielded no particular reason that a sample that had been produced with only potassium chlorate and aluminum powder could result in a significant perchlorate signal.  Other species – NA

49

Figure 49. KClO3 crystal in homemade flash powder

Figure 50. EDAX results for KClO3 flash powder 5.5.2. Potassium perchlorate and aluminum homemade flash powder This standard was made by mixing 1.36 grams of atomized aluminum powder with 0.64 grams of potassium perchlorate. The two components were mixed by hand for approximately 10 minutes before being submitted to testing. Data Summary of KClO4 and Al standard:

Mechanical Insult Data

 Impact (H50%) – 60 cm  Friction (F50%) – 77 psi  ESD (Joules) – 0.013 J

Primary Chemical Results

 Predominant metals (EDAX) – Al, K, Cl  Predominant metals (ICP-AES) – Al and K  Anion(s) – perchlorate, very small chlorate signature  Other species – NA

50

Figure 51. SEM of KClO4 and Al flash powder standard

Figure 52. EDAX results from KClO4 and Al flash powder

  1. 5.3. Potassium perchlorate/chlorate mixed and aluminum homemade flash powder

This standard was made by mixing 0.63 grams of atomized aluminum powder with 0.685 grams of potassium perchlorate and 0.685 g of potassium chlorate. The three components were mixed by hand for approximately 10 minutes before being submitted to testing. DSC results indicate that this sample does not decompose at temperatures less than 500 °C. Data Summary of KClO3/KClO4 and Al standard:

Mechanical Insult Data

 Impact (H50%) – 55 cm  Friction (F50%) – 77 psi  ESD (Joules) – 0.013 J

Primary Chemical Results

 Predominant metals (EDAX) –Al, K, Cl  Predominant metals (ICP-AES) – Al and K  Anion(s) –perchlorate and chlorate  Other species – NA

51

Thermal Sensitivity Data  DSC exotherm - NA  Other DSC features –endotherms at 305 and 358 °C are likely KClO4 phase transition and the melting of the KClO3 in the sample, respectively. This result suggests that DSC alone can be utilized to determine the presence of chlorate in fireworks samples that decompose at temperatures higher than its melting point.

Figure 53. SEM image of KP&KC + Al homemade flash powder

Figure 54. EDAX analysis of the mixed flash powder

52

Figure 55. DSC run of mixed flash powder, showing that chlorate can be detected in a DSC endotherm 6.0 Discussion

In this section, items not fully addressed in sections related to individual materials are discussed. These issues include the categories into which the materials fall by virtue of chemical and physical characteristics, some commentary on particle size and a brief note about endothermic data in DSC test results. 6.1 Results Categorization Major results of this testing program are presented in Tables 2 and 3. Overall, the results of the chemical, thermal and mechanical insult testing of the materials fell naturally into three classes of explosive materials, and one sample of non-explosive material (See Table 3):  Lift Charges  Flash Powder  Stars/Comets  Clay The results demonstrate how chemical and physical properties of the various sections within the fireworks are conserved. Published melting point of KClO3 is 356 °C.

53

  1. 1.1 Lift Charges

Lift charge materials, with physical descriptions of “black pebbles” and the like, contain relatively high concentrations of sulfur (around 10%/wt) and large concentrations of KNO3. They all exhibit thermal decomposition events that show onset around 360 °C and peak at about 440 °C. They are sensitive to electrostatic discharge, but not impact or friction, and contain potassium and nitrate anions. The decomposition (ignition) temperature and overall lack of sensitivity to mechanical forces matches those in the literature well.8 6.1.2 Flash Powder The second clear category is flash powder material with a relatively low sulfur content (in general, %/wt). These materials are more sensitive to friction and ESD than PETN and RDX, and therefore to be classed as primary explosive materials, but less sensitive to impact than these standards. All samples contain high concentrations of both Al and Mg, and perchlorate. Very small chlorate signals are seen in some materials, but all represent overall chlorate concentrations of <0.1%/wt. These materials do not thermally decompose at temperatures less than 500 °C, further indicating negligable chlorate concentration. The high decomposition (ignition) temperature has been documented in the case of flash powder materials containing magnesium. The chemical components of these materials and sensitivity to mechanical forces match those in the literature well.8 6.1.3 Stars/Comets “Stars” or “comets” are larger particle size materials with a higher sulfur content. Most of these materials are quite sensitive to reaction after mechanical stress, and are also sensitive to ESD. Because of this sensitivity, these materials should also be considered primary explosives. As a class, they have more variability than the other two classes of results. In general, they have higher concentration of sulfur than the flash powder samples. They also have higher concentrations of salts related to color production in the device, only some of these materials contain nitrate. All samples contain large concentrations of perchlorate. Very small chlorate signals are seen in some materials, but all represent overall chlorate concentrations of <0.1%/wt. Decomposition at high temperatures happens in all samples, but under conditions that vary appreciably, instead of the relatively conserved behavior of the lift charge samples. In these samples, the onset of the exotherm is around 350 °C, and reaches its peak at 400-450 °C, roughly matching the ignition temperatures listed in Conkling for a flash powder recipe containing sulfur.8

54

  1. 1.4 Clay

The last sample, Sky Festival #F, appears to be pyrotechnic clay, as the primary elements found within are aluminum and silicon. This sample was not fully tested, as a very small quantity was received, but informal mechanical insult testing shows it to be insensitive. 6.2 Particle Size Effects For a given material, the level of insult required to initiate a reaction, and the subsequent extent of that reaction in any of these tests is not only a function of its basic chemical composition, but its physical characteristics as well. These physical characteristics include physical state (i.e., gas, liquid or solid), and in the case of solids in particular, compacted samples versus particulates or powders, and the particle size of those powders. Almost all commercial propellants and pyrotechnics are produced and packaged in powder form, although the particle sizes of those powders can vary significantly. Their reaction rates are a function of both pressure and of particle size: as pressure increases, the burn rate will increase and for a specific material at a fixed pressure, smaller grain powders will burn faster than larger grain powders. Likewise, a specific material will typically exhibit greater sensitivity to thermal insults, whether internally generated or from external heat sources, as the particle size is decreased. In the present results, there are notable differences in particle size (documented in SEM images), however, no analysis was performed upon this aspect of the sample. This is chiefly due to the presence of chemical variability that would serve to make unequivocal designation of particle size effects difficult and uncertain. 6.3 Differential Scanning Calorimetry Observations Differential scanning calorimetry (DSC) was performed on all but the Sky Festival samples #E, #F and #G. The DSC provides two principal types of information, the presence or absence of a decomposition exotherm, which has already been discussed. The second type of information is based on the interpretations of the endotherms which exist prior to any decomposition event. It is clear throughout the data that the presence and temperatures of these endotherms can help to identify fireworks components. For example, crystal rearrangement and melting of KNO3 were visible in the DSC data of the lift charges. The consistency of the temperature of all the decomposition exotherms present in this data set may well be related to the boiling point of sulfur at 445 °C and the substantial vapor pressure developed before reaching the actual boiling temperature. The most interesting thing about the endotherms are their probable use in distinguing the presence of substantial concentrations of pyrotechnically interesting salts based on melting or crystal rearrangement points.

55

The chemical formulations that are intimated by the testing are all quite ordinary, being discussed at length in both internet resources and hardcopy ones, with one exception.7,8 Sky Festival #D sample exhibited one particle with a significant phosphorus signature when probed by a very narrow excitation beam in EDAX. This signal is not repeated in either the less focused EDAX nor in the ICP data. In fact, of the five EDAX spectra collected on this particular sample, there is a phosphorus signature in only one, indicating a low overall concentration of this element in the material. This sample is not more sensitive than the other flash powder type materials, either on a mechanical or thermal basis, so this result, although interesting, in all likelihood does not represent a substantial deviation from the compositions of the other samples in the tested set. 7.0 Conclusion Analysis of Pyrotechnic Components results indicate that the test samples provided behaved in ways that are consistent with extant fireworks literature available both in internet and hardcopy resources. Flash powders and their derivatives are recognized as extremely dangerous materials that are very sensitive to ignition by common handling forces, including impact, friction and static discharges of the magnitude possible from the human body. This high level of sensitivity is the rationale behind safety warnings and precautionary advice given in every guide to handling these compounds. These warnings include remote mixing of larger quantities and advice not to store bulk flash powder near personnel. 8.0 References

  1. http://www.pyrouniverse.com/consumer/howtheywork.htm
  2. www.skylighter.com
  3. http://en.wikipedia.org/wiki/Potassium_chlorate
  4. Moran, Paul, Complete Book of Flash Powder, self published 1993
  5. MIL-STD-1751A, DEPARTMENT OF DEFENSE TEST METHOD STANDARD: SAFETY AND

PERFORMANCE TESTS FOR THE QUALIFICATION OF EXPLOSIVES (HIGH EXPLOSIVES, PROPELLANTS, AND PYROTECHNICS) (11 DEC 2001)

  1. Unger, B. “Electrostatic Discharge Failures of Semiconductor Devices,” IEEE International

Reliability Physics Symposium Proceedings, 1981

  1. Russell, Michael S., The Chemistry of Fireworks, 2nd Ed., Royal Society of Chemistry, 2009
  2. Conkling, John A., and Christopher J. Mocella, Chemistry of Pyrotechnics, 2nd Ed., CRC Press 2011
  3. 0 Appendix

To be submitted separately on a CD. Many of the raw data sets are very large files.

56

  1. 0 Acknowledgments

The author recognizes the hard work of both Mr. Andrew Goddard and Ms. Elizabeth Morgan in the collection of the mechanical insult data, and useful discussions with Fred Sandstrom and Dr. Scott Preston, all of ARA.

FD06464 | 2013_美国_silver-eagle-refinery-flash-fire-and-explosion-and-catastrophic-pipe-explosion.pdf

分类:06_境外及港澳台调查报告 | 年份:2013 | 地域: | 严重程度: | 场所: | 起火原因: | 来源格式:pdf

Failure Analysis Associates Silver Eagle Refinery Explosion Investigation: Metallurgical Analysis

  1. 000 A0F0 0613 RPT1

Silver Eagle Refinery Explosion Investigation: Metallurgical Analysis

Prepared for:

Dan Tillema, P.E. Chemical Incident Investigator U.S. Chemical Safety & Hazard Investigation Board

Prepared by:

Exponent Failure Analysis Associates 10850 Richmond Ave, Suite #175 Houston, TX 77042

June 19, 2013

 Exponent, Inc.

June 19, 2013 0907487.000 A0F0 0613 RPT1 ii Contents

Page List of Figures iii List of Tables v Acronyms and Abbreviations vi Limitations vii Investigation 1 Background 1 Site Visits to Silver Eagle Refinery 2 Ruptured Pipe in the MDDW 2 Sectioning and Removal of Ruptured Pipe Components 3 Engineering Analysis 5 Release and Explosion 5 Metallurgical Analysis 7 Discussion and Conclusions 11

June 19, 2013 0907487.000 A0F0 0613 RPT1 iii List of Figures Page Figure 1. Process and instrumentation diagram (P&ID) of the MDDW reactors. 14 Figure 2. Annotated P&ID of the rupture site. 14 Figure 3. R30101 inlet and exit temperatures. 15 Figure 4. R30101 inlet and exit temperatures (detail). 15 Figure 5. R30101 pressure during catalyst regeneration. 16 Figure 6. R30101 pressure at time of failure. 16 Figure 7. Security video before rupture. 17 Figure 8. Initial gas release on security video. 17 Figure 9. Security video showing gas release rapidly expanding. 18 Figure 10. Ignition of released gas. 18 Figure 11. R30101 discharge pipe bent around reactor support beam. 19 Figure 12. Ruptured end of pipe wrapped around support beam. 19 Figure 13. Ruptured end of pipe still attached to R30101. 20 Figure 14. Explosion damage to light structural elements, hydro pad. 20 Figure 15. View from hydro pad towards adjacent residential community. 21 Figure 16. Elevation view of surveyed pipe. 21 Figure 17. Plan view of surveyed pipe. 22 Figure 18. Pipe support location. 22 Figure 19. Images of the upstream end of the fractured pipe prior to its removal in March 2010. 23 Figure 20. Images of the "SER 34" ruptured segment after sectioning and removal in March 2010. 24 Figure 21. Image of the downstream fractured section "SER 35" prior to sectioning for removal from the site in March 2010. 25 Figure 22. Image of SER employees draining fluid from the "SER 36" valve in March 2010. 25

June 19, 2013 0907487.000 A0F0 0613 RPT1 iv Figure 23. Images of the "SER 27" item as-observed outside of the reactor skirt in March 2010. 26 Figure 24. Image of the "SER 27" item, found outside the reactor skirt, as labeled in March 2010. 27 Figure 25. Image of the "SER 28" item as-observed inside the reactor skirt in March 2010. 27 Figure 26. Images showing UT measurements taken on the SER 35 segment in August 2010. 28 Figure 27. The fractured end of SER 35 during sectioning in August 2010. 29 Figure 28. The fractured end of SER 34, before and after sectioning in August 2010. 30 Figure 29. Image showing quantitative chemical analysis samples being sectioned from the 10-inch pipe and flange on SER 35 (circled) in August 2010. 31 Figure 30. Images showing sectioning of the SER 34 fracture surface for metallographic and quantitative chemical analyses in August 2010. 31 Figure 31. Image of the metallographic longitudinal cross-section specimen from the 6-o'clock location on SER 34, showing wall thickness loss at the ID surface through the weld metal and base metal of the straight segment. 32 Figure 32. Images of the metallographic longitudinal cross-section specimen from the 12-o'clock location on SER 34, showing wall thickness loss at the ID surface through the weld metal and base metal of the straight segment. 32 Figure 33. Images of SER 27 showing the results of wall thickness measurements. 33 Figure 34. Images of SER 28 showing the results of wall thickness measurements. 34 Figure 35. Images showing the in-service locations of SER 34, SER 28, and SER 27 based on alignment of fracture surface features. 35

June 19, 2013 0907487.000 A0F0 0613 RPT1 v List of Tables Table 1. Composition of gas in R30101 during catalyst regeneration. 6 Table 2. Amount of gas released at the time of ignition. 6 Table 3. Summary of quantitative chemical analysis results from the pipe segment specimens. 8 Table 4. Summary of quantitative chemical analysis results from the SER 34 fracture cross-section specimens. 9 Table 5. Alloy composition specifications from the American Society for Testing and Materials in 1966, when the pressure vessel and piping were reportedly manufactured. 9

June 19, 2013 0907487.000 A0F0 0613 RPT1 vi Acronyms and Abbreviations CFEI Certified Fire and Explosion Investigator CSB Chemical Safety Board H2 Hydrogen H2S Hydrogen Sulfide LEL Lower Explosive Limit MDDW Mobil Distillate Dewaxing Unit NFPA National Fire Protection Association P&ID Process and Instrumentation Drawing PE Professional Engineer UEL Upper Explosive Limit

June 19, 2013 0907487.000 A0F0 0613 RPT1 vii Limitations At the request of the Chemical Safety Board (CSB), Exponent conducted an investigation of circumstances associated with the November 4, 2009 explosion at the Silver Eagle Refinery in Woods Cross, Utah. Exponent investigated specific issues relevant to this explosion as requested by the CSB. The scope of services performed during this investigation may not adequately address the needs of other users of this report, and any re-use of this report or its findings, conclusions, or recommendations presented herein is at the sole risk of the user. The opinions and comments formulated during this assessment are based on observations and information available at the time of the investigation. No guarantee or warranty as to future life or performance of any reviewed condition is expressed or implied. The findings presented herein are made to a reasonable degree of engineering and scientific certainty. We have made every effort to accurately and completely investigate all areas of concern identified during our investigation. If new data becomes available or there are perceived omissions or misstatements in this report regarding any aspect of those conditions, we ask that they be brought to our attention as soon as possible so that we have the opportunity to fully address them.

June 19, 2013 0907487.000 A0F0 0613 RPT1 1 Investigation Background On November 4, 2009, an explosion occurred in the Mobil Distillate Dewaxing Unit (MDDW) of the Silver Eagle refinery, located in Woods Cross, Utah. The unit was undergoing hot hydrogen regeneration of the catalyst at the time of the explosion. Regeneration of the catalyst is a periodically performed procedure, in which the normal liquid hydrocarbon feed is stopped and a hydrogen-rich gas mixture is fed through the catalyst bed. The process is also heated from a normal operating temperature of 700°F to approximately 800°F. This allows the hot hydrogen to desorb heavy ends from the dewaxing catalyst. A process and instrumentation drawing (P&ID) of the portion of the MDDW where the explosion occurred is shown in Figure 1. There are two catalyst bed reactors in the MDDW, the South Reactor (RTR30101) and the North Reactor (RTR30103). The pipe failure occurred as a sudden and complete rupture of the 10- inch diameter line at the exit of the South Reactor. The discharge line contracts to eight inches in diameter at a flange connection just downstream from the rupture site, with an eight-inch line feeding Heat Exchanger EXC-30115 (Figure 1). Temperature and pressure measurements were made at the discharge of the South Reactor, labeled “F” and “C” in Figure 2, respectively. Inlet and exit temperatures for the South Reactor are shown in Figure 3. The catalyst regeneration procedure began at 9:00 p.m., as seen in the initial heating of the reactor. The reactor inlet temperature rose from 680°F at 9:00 p.m. to 806°F at 3:00 a.m., and remained essentially constant for the start of a planned 24-hour catalyst regeneration cycle. At 9:11 a.m., approximately six hours into the procedure, the inlet temperature suddenly dropped, and the exit temperature increased to over 1000°F (Figure 4). This resulted from the pipe rupture between 9:11 a.m. and 9:12 a.m., causing the inlet temperature to drop as the system depressurized, and the outlet temperature to rise since the outlet thermocouple was exposed to the resulting fire. Pressure in R30101 was increased from normal operating levels just below 600 psig to about 640 psi during the catalyst regeneration process (Figure 5). At the time of the accident, the pressure was at 642 psi (Figure 6).

June 19, 2013 0907487.000 A0F0 0613 RPT1 2 Security video of the accident covered the MDDW (Figure 7). The location of the pipe rupture is marked with a red circle. A frame from this video reveals the initial release of gas from the ruptured pipe (Figure 8). This release rapidly expanded (Figure 9), and the hot gas mixture ignited shortly after rupture (Figure 10). A shock wave from the resulting explosion expanded through the adjacent neighborhood, causing varied degrees of blast damage to residential homes. Exponent’s explosion investigation and analysis was conducted by Gregory J. Haussmann, Ph.D., P.E. His report was issued to the CSB on June 30, 2012. Site Visits to Silver Eagle Refinery Exponent performed an initial site visit and inspection on January 7 and 8, 2010. This included an inspection and documentation of the MDDW and an inspection and survey of the residential community adjacent to the Silver Eagle refinery. Ruptured Pipe in the MDDW The origin of the explosion was a pipe failure at the bottom of South Reactor R30101. The 10-inch diameter discharge line ruptured in the skirt underneath the reactor. The discharge line runs from the bottom of R30101 up to Heat Exchanger EXC-30115. The resulting reaction force caused by rapidly escaping high pressure gas bent the piping around a reactor support beam (Figure 11). After rupture of the pipe, high pressure gas was escaping from both ends of the pipe failure. One end of the fractured pipe ended up wrapped around a reactor support beam (Figure 12), while the second end was attached to the bottom of the reactor (Figure 13). There was explosion damage to light structural elements on the adjacent “hydro pad”, where water blasting/cleaning activities took place (Figure 14). A view from the hydro pad includes the surrounding residential community (Figure 15). Exponent retained Balling Engineering to perform site survey activities. This included measuring the as-found geometry of the R30101 discharge piping. An elevation view is shown in Figure 16. The fractured end of the pipe is labeled as Point #1025. Before the rupture, this

June 19, 2013 0907487.000 A0F0 0613 RPT1 3 pipe ran through an opening in the skirt around the base of R30101, labeled as Point #1029. The rupture occurred under the skirt around R30101. A plan (overhead) view of the pipe is shown in Figure 17. The ruptured pipe ran from the bottom discharge of South Reactor R30101 to Heat Exchanger EXC-30115. A 10-inch diameter pipe exits Reactor R30101 and reduces to eight inches in diameter at a flange connection just downstream of the fracture location outside the reactor skirt. Pipe supports underneath the pipe are illustrated in Figure 17, with the longest unsupported run of pipe measuring just less than twelve feet. A photograph of one of the pipe supports is shown in Figure 18. A sliding support was observed, with reaction forces from the pipe rupture having shifted the pipe off the support plate. Inadequate pipe support is not considered a contributing factor to this accident. Sectioning and Removal of Ruptured Pipe Components A second site visit and inspection was conducted on March 29 and 30, 2010. The incident ruptured discharge line pipe in the MDDW Unit was examined, and components were sectioned and removed from the site for further metallurgical analysis, under the direction of Mr. Darko Babic. The upstream end of the fractured segment still attached to the bottom of the reactor was labeled “SER 34” and sectioned for removal from the site, as shown in Figure 19 and Figure 20. The downstream end of the fractured segment that had wrapped around a reactor support beam was labeled “SER 35” and also sectioned for removal from the site, as shown in Figure 21 with the sectioning location through the eight-inch-diameter pipe indicated. Prior to sectioning, fluid remaining in the piping was drained through the valve designated “SER 36” and stored in a glass bottle (Figure 22). Two additional items were found near the fractured sections SER 34 and SER 35 that appeared to be pieces of the ruptured piping segment. Outside of the reactor skirt, a piece of steel approximately 20 inches in length was found (Figure 23). This item was labeled “SER 27” and retained for further examination and analysis (Figure 24). Inside of the reactor skirt, a piece of

June 19, 2013 0907487.000 A0F0 0613 RPT1 4 steel approximately 32 inches in length was found (Figure 25). This item was labeled “SER 28” and also retained for further examination and analysis. Additional debris items found inside the reactor skirt were also collected and retained.

June 19, 2013 0907487.000 A0F0 0613 RPT1 5 Engineering Analysis Release and Explosion Following the sudden rupture of the R30101 exit pipe, high pressure gas was released from both ends of the ruptured pipe. These were a 10-inch diameter pipe connected to the bottom of R30101 (Figure 13) and a longer length of 10-inch diameter pipe connected by a flange to an eight-inch diameter stainless steel pipe that fed heat exchanger EXC 30115 (highlighted in Figure 1). The composition of the gases is listed in Table 1 below. The primary species was hydrogen (81% by volume), followed by C1 or methane (9.5%), and small amounts of other light hydrocarbons and nitrogen. Temperature (Figure 4) and pressure measurements in the MDDW unit (Figure 6) show conditions at the discharge of R30101 were 642 psig and 785°F. Choked flow calculations were conducted for the gas mixture described in Table 1, as pressures were high enough to produce sonic flow at the pipe discharge. Under these conditions, the release rate of each gas species was calculated. Analysis of the security video revealed that the time between pipe rupture (Figure 8) and the initial explosion (Figure 10) was approximately 0.66 seconds. This time was used to calculate the amount of each gas species released at the time of the explosion, as listed in Table 2.

June 19, 2013 0907487.000 A0F0 0613 RPT1 6 Table 1. Composition of gas in R30101 during catalyst regeneration.

Table 2. Amount of gas released at the time of ignition. Gas Species Quantity Hydrogen 43.0 kg Nitrogen 20.3 kg Methane 40.3 kg C2 Hydrocarbons 14.0 kg C3 Hydrocarbons 57.7 kg Total 175.3 kg

June 19, 2013 0907487.000 A0F0 0613 RPT1 7 Metallurgical Analysis Examination and analysis of the items removed from the Silver Eagle Refinery in March 2010 was conducted at Exponent’s laboratory in Phoenix, Arizona under the direction of Mr. Darko Babic on August 10 and 11, 2010. Ultrasonic thickness (UT) testing on the fractured end of the SER 35 segment was conducted at locations along the length and around the circumference of the ruptured pipe. Thickness measurements ranged from 0.120 to 0.244 inches (Figure 26). The fractured end was then sectioned from the remaining segment approximately 12 inches upstream of the flange shoulder with a handheld reciprocating saw (Figure 27). UT measurements were also conducted on the SER 34 segment, ranging from 0.522 to 0.570 inches along the elbow intrados (inner curve), and 0.372 to 0.448 inches along the elbow extrados (outer curve), with the wall thickness measurements generally decreasing with distance downstream. Wall thickness measurements near the fracture surface were taken around the circumference of the pipe, and ranged from 0.032 to 0.112 inches. At the upstream field-cut end of SER 34, thickness measurements were between 0.526 and 0.585 inches. The fractured end was then sectioned from the remaining segment approximately six inches upstream of the fracture with a band saw (Figure 28). Samples for quantitative chemical analysis were sectioned from the upstream field-cut end of the SER 34 segment, the lab-cut end of the SER 35 segment, the SER 35 segment flange, and the downstream eight-inch-diameter field-cut end of the SER 35 segment. All four samples were removed using a handheld reciprocating saw (Figure 29). Examination of the SER 34 fracture area revealed that the fracture occurred just downstream of the circumferential weld between the elbow and the straight segment. Cross-sectional specimens containing the weld and the fracture surface were then cut for metallographic and quantitative chemical analysis (Figure 30). The chemical analysis samples were sectioned from the 6 o’clock location and labeled “6-1” (the upstream elbow segment), “6-2” (the

June 19, 2013 0907487.000 A0F0 0613 RPT1 8 circumferential weld), and “6-3” (the downstream straight segment containing the fracture surface). Quantitative chemical analysis of the seven specimens was conducted. The Form U-1 Manufacturers’ Data Report from the original construction of the pressure vessel in 1966 had specified the ASTM alloys for the pressure vessel shell and heads, and for nozzles.1 The results are given in Table 3 and Table 4, with the applicable 1966 ASTM alloy specifications in Table

  1. The compositions of the specimens from the 10-inch straight segment (“SER 35” and “6-3”)

were consistent with the specifications current in 1966 for ASTM A213, Grade T12 alloy steel. The compositions of the specimens from the elbow segment (“SER 34” and “6-1”) were consistent with Grade T11. The 8-inch specimen was consistent with 304 stainless steel.

Table 3. Summary of quantitative chemical analysis results from the pipe segment specimens. Element SER 34 Composition, wt.% SER 35 Composition, wt.% Flange Composition, wt.% 8-inch Pipe Composition, wt.% Fe balance Balance balance balance C 0.09 0.15 0.17 0.05 Si 0.66 0.23 0.68 0.46 Cr 1.19 0.91 1.10 18.16 Mo 0.60 0.54 0.50 0.38 Mn 0.50 0.34 0.59 1.72 S 0.006 0.017 0.016 0.018 P 0.009 0.007 0.022 0.030 Cu 0.03 0.06 0.17 0.30 Ni 0.08 0.11 0.19 8.17 Al 0.02 <0.01 0.08 <0.01 Nb <0.01 <0.01 0.01 0.02 Ti <0.01 <0.01 <0.01 <0.01 V 0.01 0.01 0.02 0.06 Co <0.01 0.01 0.03 0.16 Sn 0.02 0.02 0.02 <0.01 W <0.01 <0.01 0.04 0.03

1 “Form U-1A, Manufacturers’ Data Report for Unfired Pressure Vessels”, completed by Sun Shipbuilding and Dry Dock Company, Chester, PA, dated September 1966. Doc. no. MDDW CSB 1DOC1 0065.

June 19, 2013 0907487.000 A0F0 0613 RPT1 9 Table 4. Summary of quantitative chemical analysis results from the SER 34 fracture cross-section specimens. Element 6-1 (Elbow) Composition, wt.% 6-2 (Weld) Composition, wt.% 6-3 (Straight Segment) Composition, wt.% Fe balance Balance balance C 0.10 0.07 0.15 Si 0.67 0.48 0.23 Cr 1.19 1.25 0.91 Mo 0.62 0.62 0.56 Mn 0.50 0.54 0.33 S 0.006 0.023 0.022 P 0.009 0.017 0.007 Cu 0.03 0.06 0.06 Ni 0.08 0.08 0.11 Al 0.04 <0.01 <0.01 Nb <0.01 0.01 <0.01 Ti <0.01 0.02 <0.01 V 0.01 0.05 0.01 Co <0.01 0.01 0.01 Sn 0.02 0.02 0.02 W <0.01 <0.01 <0.01

Table 5. Alloy composition specifications from the American Society for Testing and Materials in 1966, when the pressure vessel and piping were reportedly manufactured. Element ASTM A213-66 specification (Grade T11), wt.%2 ASTM A213-66 specification (Grade T12), wt.%2 ASTM A182-65 specification (Grade F11), wt.%3 Fe balance balance balance C 0.15 max 0.15 max 0.10-0.20 Si 0.50-1.00 0.50 max 0.50-1.00 Cr 1.00-1.50 0.80-1.25 1.00-1.50 Mo 0.44-0.65 0.44-0.65 0.44-0.65 Mn 0.30-0.60 0.30-0.61 0.30-0.80 S 0.030 max 0.045 max 0.040 max P 0.030 max 0.045 max 0.040 max

2 ASTM A213-66, “Standard Specification for Seamless Ferritic and Austenitic Alloy-Steel Boiler, Superheater, and Heat Exchanger Tubes”, American Society for Testing and Materials, 1966. 3 ASTM A182-65, “Standard Specifications for Forged or Rolled Alloy-Steel Pipe Flanges, Forged Fittings, and Valves and Parts for High-Temperature Service”, American Society for Testing and Materials, 1965.

June 19, 2013 0907487.000 A0F0 0613 RPT1 10 Examination of the metallographic longitudinal cross-sections that included the weld and the fracture surface clearly indicated that wall thinning had occurred through the weld metal and the base metal of the 10-inch straight segment from the inside diameter (ID), as shown in Figure 31 and Figure 32. The rupture was in the straight segment base metal. Thickness measurements were made near the edges of the fracture surfaces on the SER 27 and SER 28 pieces. On SER 27, measurements ranged between 0.065 and 0.171 inches (Figure 33). On SER 28, measurements ranged between 0.039 and 0.170 inches (Figure 34). Subsequently, SER 27 and SER 28 were aligned with the fracture surface from SER 34, with fracture surface features confirming their original in-service locations as part of the 10-inch straight segment (Figure 35).

June 19, 2013 0907487.000 A0F0 0613 RPT1 11 Discussion and Conclusions According to information provided to Exponent during the course of our investigation, the incident piping was installed and put into service in the MDDW at the Silver Eagle Refinery with the South Reactor (RTR30101) in 1993.4 The reactor pressure vessel was originally constructed in 1966. The unit typically operated in the temperature range of 500°F to 800°F, and was rated to 1000 psi at 800°F at the time of the incident.5 The nominal system pressure was reported to be 625 psi at 735°F. It has not been determined if the 10-inch elbow and straight segment were new at the time of the 1993 installation in the MDDW, or if they had been used in prior service with the reactor pressure vessel during its previous application as a lube stock hydrotreater. Regardless, to date no documentation has been produced indicating that the wall thickness of the straight segment was ever measured from build date to the time of the incident. In 1993, UT readings on the 10-inch elbow ranged from 0.671 to 0.805 inches. The October 2007 Inspection Sheet stated an “original thickness” noted by the inspector as “0.719" AS PER DWG”.4 To date, no documentation or design drawings have been produced to show or verify where the inspector determined this original thickness value. In October 2007, the UT thickness measurement for this elbow at Wall Thickness Measurement Location 43 was 0.483 inches, indicating wall thickness loss had occurred in the prior 14 years of service. A “Diesel Hydrotreater Startup Report” issued by Albemarle Catalysts following a turnaround in April 2006 indicated that sulfiding was conducted to activate the catalyst.6 The report mentioned that the “straight run diesel from the crude unit had a sulfur content of 1.0 wt%.” It also stated that hydrogen sulfide (H2S) concentration in the recycle gas “exceeded 0.5 vol%” during the sulfiding.

4 Silver Eagle MDDW Pressure Vessel Inspection Sheet, October 15, 2007, Doc. No. MDDW UOSH20 0025. 5 Silver Eagle PV-SER-1 Pressure Vessel External Inspection Report, October 18, 2007, Doc. No. MDDW UOSH20 0021. 6 Albemarle Catalysts Diesel Hydrotreater Startup Report, April 18, 2006, Doc. No. MDDW UOSH20 0035- 0042.

June 19, 2013 0907487.000 A0F0 0613 RPT1 12 Sulfidation corrosion is a known issue in oil refinery process streams operating between 450°F and 1000°F where sulfur or H2S is present.7 Low-alloy carbon steel with low levels of silicon, chromium, and molybdenum are particularly vulnerable. Reaction of the pipe metal surface with sulfur compounds in the process stream results in the formation of a sulfide scale. On susceptible components, this scale may be non-adherent and, particularly under turbulent flow conditions, leads to significant wall thinning. Naphthenic acid corrosion can also lead to damage in petrochemical process piping. The term “naphthenic acid” refers to all of the organic acids present in crude oil. There can be competition between the sulfidation corrosion and naphthenic acid corrosion reactions, and in some cases sulfidation corrosion can be accelerated by the presence of naphthenic acids.8 The naphthenic acid corrosion product is soluble in oil, which results in wall thinning without residual corrosion products or films remaining on the affected material. High velocities and turbulent flow can accelerate naphthenic acid corrosion, but the corrosion rates diminish above 700°F, and naphthenic acid corrosion will not occur when the organic acids have been transformed into the vapor phase.9 Naphthenic acid corrosion is typically characterized as having more localized attack than sulfidation corrosion, particularly at areas of high flow velocity.10 Service experience has reportedly shown that 304 stainless steel suffers localized corrosion in naphthenic acid service above 425°F, with the molybdenum-containing alloys such as 316 providing better corrosion resistance.8 While additional analysis, such as characterization of the surface scale still present on the incident piping components, may further confirm the presence of sulfide scale, the evidence is currently consistent with sulfidation corrosion as the primary cause of the wall thinning in the 10-inch piping that resulted in the rupture. Turbulent flow at the elbow likely caused the most

7 API Recommended Practice 939-C, “Guidelines for Avoiding Sulfidation (Sulfidic) Corrosion Failures in Oil Refineries”, First Edition, American Petroleum Institute, May 2009. 8 H.J. de Bruyn, “Naphthenic Acid Corrosion in Synthetic Fuels Production”, Proceedings of Corrosion 98, NACE International, 1998, Paper No. 576. 9 G.M. Bota et al., “Naphthenic Acid Corrosion of Mild Steel in the Presence of Sulfide Scales Formed in Crude Oil Fractions at High Temperature”, Proceedings of Corrosion 2010 Conference & Expo, NACE International, 2010, Paper No. 10353. 10 R.D. Kane and M.S. Cayard, “A Comprehensive Study on Naphthenic Acid Corrosion”, Proceedings of Corrosion 2002, NACE International, 2002, Paper No. 02555.

June 19, 2013 0907487.000 A0F0 0613 RPT1 13 significant wall thinning at the rupture location just downstream of the elbow. The low silicon, chromium, and molybdenum contents of the straight segment, and the service temperatures and process stream chemistry, are all consistent with sulfidation corrosion. It appears that corrosion monitoring of the straight segment was not conducted between 1993 and the time of the rupture. The remainder of the line downstream, composed of 8-inch-diameter 300-Series stainless steel, is less susceptible to sulfidation corrosion. In addition, because service temperatures were reportedly above 700°F, naphthenic acid corrosion is less likely to have been the primary cause of the wall thinning on the ruptured segment.

June 19, 2013 0907487.000 A0F0 0613 RPT1 14

Figure 1. Process and instrumentation diagram (P&ID) of the MDDW reactors.

Figure 2. Annotated P&ID of the rupture site.

June 19, 2013 0907487.000 A0F0 0613 RPT1 15

Figure 3. R30101 inlet and exit temperatures.

Figure 4. R30101 inlet and exit temperatures (detail).

June 19, 2013 0907487.000 A0F0 0613 RPT1 16 graphics

Figure 5. R30101 pressure during catalyst regeneration.

Figure 6. R30101 pressure at time of failure.

June 19, 2013 0907487.000 A0F0 0613 RPT1 17

Figure 7. Security video before rupture.

Figure 8. Initial gas release on security video.

June 19, 2013 0907487.000 A0F0 0613 RPT1 18

Figure 9. Security video showing gas release rapidly expanding.

Figure 10. Ignition of released gas.

June 19, 2013 0907487.000 A0F0 0613 RPT1 19

Figure 11. R30101 discharge pipe bent around reactor support beam.

Figure 12. Ruptured end of pipe wrapped around support beam.

June 19, 2013 0907487.000 A0F0 0613 RPT1 20

Figure 13. Ruptured end of pipe still attached to R30101.

Figure 14. Explosion damage to light structural elements, hydro pad.

June 19, 2013 0907487.000 A0F0 0613 RPT1 21

Figure 15. View from hydro pad towards adjacent residential community.

Figure 16. Elevation view of surveyed pipe.

June 19, 2013 0907487.000 A0F0 0613 RPT1 22

Figure 17. Plan view of surveyed pipe.

Figure 18. Pipe support location.

June 19, 2013 0907487.000 A0F0 0613 RPT1 23

Figure 19. Images of the upstream end of the fractured pipe prior to its removal in March 2010.

June 19, 2013 0907487.000 A0F0 0613 RPT1 24

Figure 20. Images of the "SER 34" ruptured segment after sectioning and removal in March 2010.

June 19, 2013 0907487.000 A0F0 0613 RPT1 25

Figure 21. Image of the downstream fractured section "SER 35" prior to sectioning for removal from the site in March 2010.

Figure 22. Image of SER employees draining fluid from the "SER 36" valve in March 2010.

June 19, 2013 0907487.000 A0F0 0613 RPT1 26

Figure 23. Images of the "SER 27" item as-observed outside of the reactor skirt in March 2010.

June 19, 2013 0907487.000 A0F0 0613 RPT1 27

Figure 24. Image of the "SER 27" item, found outside the reactor skirt, as labeled in March 2010.

Figure 25. Image of the "SER 28" item as-observed inside the reactor skirt in March 2010.

June 19, 2013 0907487.000 A0F0 0613 RPT1 28

Figure 26. Images showing UT measurements taken on the SER 35 segment in August 2010.

June 19, 2013 0907487.000 A0F0 0613 RPT1 29

Figure 27. The fractured end of SER 35 during sectioning in August 2010.

June 19, 2013 0907487.000 A0F0 0613 RPT1 30

Figure 28. The fractured end of SER 34, before and after sectioning in August 2010.

June 19, 2013 0907487.000 A0F0 0613 RPT1 31

Figure 29. Image showing quantitative chemical analysis samples being sectioned from the 10-inch pipe and flange on SER 35 (circled) in August 2010.

Figure 30. Images showing sectioning of the SER 34 fracture surface for metallographic and quantitative chemical analyses in August 2010.

June 19, 2013 0907487.000 A0F0 0613 RPT1 32

Figure 31. Image of the metallographic longitudinal cross-section specimen from the 6-o'clock location on SER 34, showing wall thickness loss at the ID surface through the weld metal and base metal of the straight segment.

Figure 32. Images of the metallographic longitudinal cross-section specimen from the 12-o'clock location on SER 34, showing wall thickness loss at the ID surface through the weld metal and base metal of the straight segment.

June 19, 2013 0907487.000 A0F0 0613 RPT1 33

Figure 33. Images of SER 27 showing the results of wall thickness measurements.

June 19, 2013 0907487.000 A0F0 0613 RPT1 34

Figure 34. Images of SER 28 showing the results of wall thickness measurements.

June 19, 2013 0907487.000 A0F0 0613 RPT1 35

Figure 35. Images showing the in-service locations of SER 34, SER 28, and SER 27 based on alignment of fracture surface features.

FD06465 | 2014_美国_Chevron Richmond 炼油厂 火灾 - Chevron Richmond Refinery Fire__最终报告_4.pdf

分类:06_境外及港澳台调查报告 | 年份:2014 | 地域: | 严重程度: | 场所:化工/石化 | 起火原因: | 来源格式:pdf

202-234-4433 Neal R. Gross and Co., Inc. Page 1 U.S. CHEMICAL SAFETY BOARD

CHEVRON RICHMOND REFINERY

PUBLIC MEETING

WEDNESDAY, JANUARY 15, 2014

U.S. CHEMICAL SAFETY BOARD MEMBERS PRESENT: RAFAEL MOURE-ERASO, Ph.D., Chairperson, U.S. Chemical Safety Board MARK GRIFFON, Member, U.S. Chemical Safety Board BETH J. ROSENBERG, Sc.D., M.P.H., Member, U.S. Chemical Safety Board STAFF PRESENT: DANIEL M. HOROWITZ, Ph.D., Managing Director RICHARD C. LOEB, General Counsel *HILLARY COHEN, Communications Manager DON HOLMSTROM, Director, Western Regional Office *AMY McCORMICK, Contracting Officer AMANDA JOHNSON, Investigator DAN TILLEMA, Team Lead This transcript produced from audio provided by the U.S. Chemical Safety Board.

202-234-4433 Neal R. Gross and Co., Inc. Page 2 T-A-B-L-E O-F C-O-N-T-E-N-T-S Welcome and Opening Statements by Board Chairperson Rafael Moure-Eraso . . . . . 3 Member Beth J. Rosenberg . . . . . . . .11 Member Mark Griffon. . . . . . . . . . .18 Address by Elected Officials Mayor Gayle McLaughlin . . . . . . . . .26 Vice-Mayor Jovanka Beckles . . . . . . .33 Barbara Johnson. . . . . . . . . . . . .36 Terrance Cheung. . . . . . . . . . . . .48 Jim Rogers . . . . . . . . . . . . . . .55 CSB Findings & Recommendations Don Holstrom . . . . . . . . . . . . . .62 Dan Tillema. . . . . . . . . . . . . . .67 Amanda Johnson . . . . . . . . . . . . .74 Reading of Investigative Team's Proposed Recommendations Don Holstrom . . . . . . . . . . . . . .82 Board Questions for Investigative Team . . . .89 Public Comments Daniel Horowitz. . . . . . . . . . . . 111 Board Consideration of Final Report. . . . . 261

202-234-4433 Neal R. Gross and Co., Inc. Page 3 1 P R O C E E D I N G S 2 (6:30 p.m.) 3 CHAIRPERSON MOURE-ERASO: And 4 that's kind of a reflection of the magnitude 5 that these problems can have. In here, we 6 have problems with the air. In Charleston, 7 West Virginia, they have serious problems with 8 the water. 9 Before we go any further 10 (inaudible), it's necessary that we review the 11 safety exits. If nothing happens to us and 12 everything is normal, you will leave the 13 building the way you entered. 14 But if something goes wrong, you 15 have to be aware that there is two exits here, 16 two emergency exits, in addition to the two 17 ones that are in the front over there. We are 18 supposed to do that in the safety meeting. 19 I would like to introduce my 20 fellow board members and the people that are 21 here on the panel. I am Rafael Moure-Eraso. 22 I am chairperson of the U.S. Chemical Safety

202-234-4433 Neal R. Gross and Co., Inc. Page 4 1 Board. 2

3 And with me I have, to my left, 4 Dr. Beth Rosenberg, CSB board member. I have, 5 to my right, Mark Griffon, which is also a CSB 6 board member. The three of us are, at this 7 time, the board of the Chemical Safety Board. 8 Also with me here, to my right, is 9 the General Counsel of the Chemical Safety 10 Board. And, you know, he is going to be 11 helping us to deal with any legal or any 12 matters that relate to how to run the meeting. 13 Mr. Richard Loeb is here, sitting to my right. 14 Also here is the investigative 15 team with the director of our Western office 16 is sitting to my left and our medical director 17 and our communications director is sitting to 18 my right. We'll go into details in those 19 presentations when they are to speak. 20 I don't know if all of you were 21 able to see an agenda. There is an agenda of 22 how we're going to proceed that I am going to

202-234-4433 Neal R. Gross and Co., Inc. Page 5 1 read as follows, the agenda. 2 The first thing I would like to do 3 is I am going to give you some introductory 4 remarks from the Chair. I am sure you all 5 know that we released the last draft of our 6 federal report, this precisely one that we are 7 looking today, at a press conference here on 8 December the 16th, 2013. 9 The objective of that press 10 conference and releasing the report then was 11 to ask for public comment on the contents of 12 the report and specifically on the 13 recommendations of the report. 14 And the comments are in and can be 15 reviewed on the CSB Website with our specific 16 responses that we have to the comments that 17 were presented. 18 The period that we asked for 19 people to send comments were from December 20 16th through January 3rd. And we got a 21 substantial amount of comments that we 22 reviewed.

202-234-4433 Neal R. Gross and Co., Inc. Page 6 1 We have considered and we have 2 incorporated suggestions from these comments 3 in the final report that we are discussing 4 today. 5 The comments that we received were 6 from the State of California, from California 7 OSHA, I'm sorry, from Federal OSHA, from the 8 Chevron Company, from the University of Texas 9 A&M, the Mary K. O'Connor Center for Process 10 Safety. 11 We have comments from the American 12 Petroleum Institute for the United Steel 13 Workers Local 5 which is the one that 14 represents the workers here in Richmond and 15 also comments from the United Steelworkers 16 International. 17 We have comments from the Center 18 for Chemical Process Safety, from the American 19 Institute of Chemical Engineers. We have 20 comments from the American Fuel and 21 Petrochemical Manufacturers, the American 22 Chemical Council, the Western States Petroleum

202-234-4433 Neal R. Gross and Co., Inc. Page 7 1 Association, the California Refinery Action 2 Collaborative and from 15 individuals that it 3 was their statement. 4 The work of our staff has been the 5 diligent and difficult work of trying to 6 understand and incorporate the suggestions 7 that we thought that were relevant into our 8 final report. 9 That report today is going to be 10 presented officially. And we are then voting, 11 the Board is going to vote for approval or 12 disapproval of the recommendations as they 13 appear in the report. 14 The reasons that we are here, that 15 we deployed to this problem and initiated 16 these investigations, is because we believe 17 that we have a fundamental refinery safety 18 problem in the United States. 19 In 2012 alone, the CSB tried 125 20 significant process safety incidents at the 21 U.S. petroleum refineries. Seventeen of these 22 took place in your State, in California. The

202-234-4433 Neal R. Gross and Co., Inc. Page 8 1 current regulatotry system clearly is not 2 working to make these facilities as safe as is 3 possible for you. 4 Refineries account for the highest 5 number of reportable accidents among the 6 facilities who are covered by the EPA risk 7 management program rules in the whole United 8 States. Refinery is the Number 1 industrial 9 group that has the most frequent accidents 10 that are reportable in their R and P. 11 We have examined a Swiss MS. 12 REYNOLDS: report. Swiss Re is a great 13 insurance company that looks at production 14 worldwide. And this company reported, with 15 data from 2005, that the dollar cost of losses 16 for accidents in U.S. American refineries was 17 almost three times that same cost of losses 18 from refineries from the European Union. So 19 we do have a problem in refineries. 20 In the world of the CSB, six of 21 our current 13 ongoing CSB investigations are 22 in U.S. refineries.

202-234-4433 Neal R. Gross and Co., Inc. Page 9 1 The OSHA, after our recommendation 2 on the BP Texas City explosion in 2005, 3 initiated a new emphasis program on process 4 safety management that looks at refineries. 5 And we took a sample of refineries 6 in the United States. And they have serious 7 problems of compliance with the process safety 8 management to be in this study that is called 9 the Emphasis Program for refineries. 10 All of these facts are presented 11 in detail, properly annotated, in the CSB 12 investigation report that we are voting on 13 today and that can be found outside. 14 Our CSB report finds that the 15 regulatory system in the U.S., we find it 16 wanting. The CSB report today calls for 17 sweeping changes in the way refineries are 18 regulated in California. 19 Our investigation team will 20 outline this report to you in detail. I urge 21 you to listen carefully to the special 22 recommendations that the Board will consider

202-234-4433 Neal R. Gross and Co., Inc. Page 10 1 for the State of California to establish a 2 more rigorous safety management regulatory 3 framework for petroleum refineries. 4 You will be hearing about what 5 will be a new approach in this country for 6 refinery regulation, the Safety Case regime. 7 The principles the Safety Case framework 8 actually use regulatory systems in the United 9 Kingdom, in Australia and in Norway. 10 The applications of similar 11 principles of the Safety Case regime are also 12 found in the United States. You will look at 13 the safety management of the Nuclear 14 Regulatory Commission and of NASA principles 15 of Safety Case are applied there. And they 16 are now conforming to the U.S. experience of 17 safety management. 18 By adopting our recommendation of 19 the Safety Case regime, the State of 20 California could become the National test bed 21 for refinery safety regulation designed to 22 prevent catastrophic failures.

202-234-4433 Neal R. Gross and Co., Inc. Page 11 1 Over the years, the CSB has 2 gathered a lot of data on the root causes of 3 biochemical accidents and has evaluated the 4 opportunities of the refinery and chemical 5 industry regulatory system. 6 I believe all of us on the Board 7 appreciate the work of our investigatory team 8 that has focused on this root cause and has 9 looked at all the issues that I am presenting 10 to you today. 11 We also would like to applaud the 12 work of the government of California 13 interagency task force for their proactive 14 approach to protect workers and public safety 15 in California following our interim report 16 last April and for the progress that they have 17 us on our recommendations to this particular 18 report. 19 Now, I would like to call on my 20 colleagues of the CSB Safety Board for any 21 opening remarks. So Member Rosenberg? 22 MEMBER ROSENBERG: Thank you.

202-234-4433 Neal R. Gross and Co., Inc. Page 12 1 Good evening. The CSB found that Chevron had 2 been warned at least seven times over a decade 3 that pipes were subject to sulfidation 4 corrosion and they should be inspected and, if 5 necessary, replaced. 6 All three board members, as well 7 as Congressman Miller, agreed that the pipe 8 failure was really a management failure to 9 heed any warnings of its own employees and 10 evidence from experts. Chevron's management 11 failure has yet to be explained. 12 And now we are proposing a 13 different regulatory regime which has been 14 widely touted as a new, improved safety 15 regime. 16 There are many appealing aspects 17 of the Safety Case regime which you will hear 18 about tonight. While I do not oppose trying 19 to implement some of the positive aspects of 20 the Safety Case regime in California, I have 21 reservations. 22 The idea of industry making the

202-234-4433 Neal R. Gross and Co., Inc. Page 13 1 case to a competent regulator that it can 2 carry out its business safely and having labor 3 provide checks and balances is a very nice 4 model if all three parties have somewhat equal 5 power. Safety Case regime can work if labor, 6 Government and industry are balanced. 7 I have real concerns that if we 8 implement the Safety Case regime, we will 9 simply be duplicating the same power relations 10 of weak labor, weak Government and strong 11 industry in a different format. 12 In the offshore oil industry in 13 the U.K., Safety Case has shown to improve 14 safety, not so on onshore facilities. 15 Dr. Nancy Leveson, an MIT 16 professor of engineering systems who served on 17 the Baker Panel that was convened by the CSB 18 in the aftermath of the BP Texas City incident 19 in 2005, says in her public comments that, 20 "The available evidence indicates that the 21 Safety Case offers no superior protection 22 against process safety incidents."

202-234-4433 Neal R. Gross and Co., Inc. Page 14 1 In fact, the poor use of Safety 2 Case has been faulted in numerous accidents. 3 An independent review of the 2006 loss of the 4 RAF Nimrod which resulted in 14 fatalities 5 leveled harsh criticisms of the Safety Case 6 regime including that, "The Safety Case regime 7 has lost its way, led to a culture of paper 8 safety at the expense of real safety." 9 Rory O'Neill, long time labor 10 activist in the U.K., editor of Hazard 11 Magazine and good friend of the United 12 Steelworkers, in a recent email sarcastically 13 referred to the magic Safety Case because it 14 was falling so far short of expectations. 15 In an email yesterday, O'Neill 16 said the Safety Case is, "Amounting to 17 enormous piles of paper submitted to an agency 18 with few and rapidly declining resources to 19 scrutinize them and fewer still to detect 20 compliance." 21 On the other hand, what we have 22 now is not working. And you deserve something

202-234-4433 Neal R. Gross and Co., Inc. Page 15 1 better. I understand your eagerness to try 2 something new. This report is a very good 3 start to exploring a new possibility about 4 what a Safety Case regime could be. 5 But the public comments, as well 6 as what I've learned about Safety Case in the 7 last year, give me pause. there is much more 8 to learn from other countries that have a 9 Safety Case regime about how it actually works 10 in practice. I'm uneasy with the fact that 11 Safety Cases are not public documents. So you 12 and I can't see them. 13 Three months ago, I asked you 14 Judith Hackitt, the head of HSE which is U.K's 15 OSHA, about the role of labor in Safety Cases. 16 She said that Safety Cases are mainly 17 negotiations between companies and the 18 Government, and labor isn't really involved, 19 nor is the public. 20 I cannot, in good conscience, 21 recommend something where labor and 22 communities might be weakened in any way.

202-234-4433 Neal R. Gross and Co., Inc. Page 16 1 Further, even if you decide to implement the 2 Safety Case regime, it will take years to 3 train regulators in industry and figure out 4 how it dovetails with regulations. Safety 5 Case regime is a long term plan. You need 6 more immediate remedies that have not been 7 implemented. 8 Contra Costa County has been 9 touted as a model program in refinery safety, 10 yet there were failures. 11 The CSB investigators know the 12 gaps in the safety program and made two 13 recommendations in our previous report but 14 left some gaps without remedies. 15 These include the need for more 16 resources to allow reasonable staffing levels 17 with adequate salaries for inspectors and for 18 inspectors to have direct enforcement 19 authority rather than having to refer 20 violations they find to the district attorney 21 with a recommendation for enforcement. The 22 CSB could investigate this problem quickly and

202-234-4433 Neal R. Gross and Co., Inc. Page 17 1 make appropriate recommendations. 2 The issue of timely abatement has 3 been brought up in this state. Currently, the 4 employer is not obligated to correct a 5 violation if the employer files an appeal. 6 And we know litigation can take years. If the 7 violation presents a serious hazard, it makes 8 no public health sense for a known hazard not 9 to be corrected. 10 Washington State has a version of 11 the timely abatement and even when an appeal 12 is filed while still giving employers due 13 process rights. OSHA supports this. 14 Assembly member Nancy Skinner and 15 Senator Loni Hancock passed such a bill last 16 year that was vetoed by the Government. But 17 thankfully, they have not given up and will 18 re-introduce it. We at the CSB should be 19 involved in this effort. 20 These few issues of resources for 21 Contra Costa County inspectors expanding 22 enforcement authority and timely abatement are

202-234-4433 Neal R. Gross and Co., Inc. Page 18 1 remedies that the CSB could make 2 recommendations on now. 3 So to summarize, this report is a 4 very, very good start in illustrating the 5 benefits of Safety Case regime. The staff is 6 to be commended for their excellent work thus 7 far. 8 I don't think we, that is both the 9 staff and the Board, have had time to 10 adequately examine the down sides of Safety 11 Case regimes in practice and how we can 12 prevent them from occurring here. 13 More importantly, there are clear 14 short term remedies that need our immediate 15 attention to protect workers and the public. 16 Thank you. 17 (Applause) 18 CHAIRPERSON MOURE-ERASO: The 19 statement of Board Member Griffon is next. 20 MEMBER GRIFFON: Thank you, Mr. 21 Chairman. Good evening. I'm excited to be 22 here in Richmond once more to discuss some

202-234-4433 Neal R. Gross and Co., Inc. Page 19 1 possible solutions which could go a long way 2 to preventing another incident like the one 3 that took place in August 2012. 4 I want to start by stressing what 5 I mentioned in the meeting that we had in 6 April of 2013. These type of incidents at 7 refineries around the U.S. are far too common. 8 I also say, again, that I believe 9 a significant factor contributing to the 10 incidents in the refinery sector is the age of 11 the facilities. 12 The fact that was stressed in the 13 U.K. health and safety executive study, which 14 showed that 50 percent of the major hazard 15 loss of containment events were primarily due 16 to aging plant mechanisms such as corrosion, 17 erosion and fatigue. Any regulatory solution 18 we consider must consider this important 19 factor. 20 Chevron was clearly aware of a 21 corrosion problem and yet repeated warnings 22 were dismissed. If Chevron management had

202-234-4433 Neal R. Gross and Co., Inc. Page 20 1 listened to their own experts, this incident 2 may have been prevented. 3 I am very interested in gaining a 4 better understanding of what appears to have 5 been management's failures. And as Dr. 6 Meshkati from the University of Southern 7 California noted in his comments to the CSB, 8 the oil refinery industry's safety culture, 9 and its senior management safety consciousness 10 and genuine commitment are the keys to moving 11 above and beyond the bare minimums achieved by 12 regulatory compliance. 13 These type of management failures, 14 it seems to me, are independent of the 15 regulatory framework in place. I look forward 16 to our final report on Chevron which will 17 cover these organizational questions. 18 So, we're here tonight to discuss 19 the regulatory findings and recommendations 20 for the County and the State. 21 When we first made our decision to 22 investigate the incident, a big factor was the

202-234-4433 Neal R. Gross and Co., Inc. Page 21 1 effect the incident had on the community and 2 the effectiveness of the Contra Costa County 3 Health Services model. After all, this model 4 was a model held up and touted by the CSB for 5 years. 6 In the CSB, their report, an 7 entire section was dedicated to describing the 8 Contra Costa model. And yesterday, someone in 9 Charleston, West Virginia, was calling for 10 implementation of CSB recommendations for 11 Kanawha County to adopt a model like the 12 Contra Costa County. 13 We need to know if this model 14 didn't work. And we need to, if possible, 15 make recommendations to improve the 16 effectiveness of the Contra Costa Industrial 17 Safety Ordinance. 18 The draft regulatory report makes 19 many very interesting findings with regard to 20 deficiencies in the current process safety 21 regulations and provides a good description of 22 an alternative model for Safety Case.

202-234-4433 Neal R. Gross and Co., Inc. Page 22 1 While the staff deserves credit 2 for their extensive research, the report 3 leaves many questions unanswered. Comments 4 received from a wide spectrum of stakeholders 5 and experts in just the past several weeks 6 indicate more study is needed. 7 The American Fuel and Petroleum 8 Manufacturers said the CSB should continue to 9 study and analyze different regulatory 10 regimes. 11 Professor Michael Baram of Boston 12 University said discussing implementation 13 issues would also correct an obvious imbalance 14 in the report. And Mike Wright of the United 15 Steelworkers said a great deal more work needs 16 to be done before a Safety Case system can be 17 fully considered as a regulatory model for 18 California. 19 I agree with these comments. It 20 also seems clear that many of the elements of 21 Safety Case may have applicability to the 22 current regulatory approach. This raises the

202-234-4433 Neal R. Gross and Co., Inc. Page 23 1 question should the CSB advocate for total 2 reform of the regulatory regime to a Safety 3 Case regime? Or should we propose to 4 strengthen the current regulatory approach? 5 I would argue this is not an 6 either/or proposition. We can and should do 7 both. In the near-term, I think it is 8 important to put forward options that 9 strengthen the current regulatory approaches. 10 For example, it seems to me that 11 an adequately resourced agency with a 12 sufficient number of highly qualified 13 inspectors is needed in the current system as 14 well as a possible Safety Case regime. 15 And also, it seems reasonable to 16 me to give the current regulator the authority 17 to require generally accepted best practices. 18 Perhaps such a change does not require a 19 regime change. 20 Considering recommendations to fix 21 the current regulatory approach may require 22 further work on the part of the CSB. But it

202-234-4433 Neal R. Gross and Co., Inc. Page 24 1 is also much more likely to have a more 2 immediate effect on improving safety for 3 California, and Contra Costa County refineries 4 and the communities near the refineries. 5 It is critical that the CSB 6 consider these more immediate options for both 7 Cal/OSHA and the Contra Costa Health Services. 8 I believe the Safety Case approach 9 is a very interesting model which may be the 10 future for process safety for highly hazardous 11 facilities in California and in the United 12 States. However, it is also clear to me that 13 much more needs to be studied, especially with 14 regard to implementation. 15 The draft report focuses on the 16 strengths of the Safety Case approach abroad 17 but falls short in addressing obstacles or 18 challenges to implementing such a regime in 19 California or the United States. 20 Please don't misinterpret my 21 statement to be against the concept of Safety 22 Case. In fact, quite the opposite is true.

202-234-4433 Neal R. Gross and Co., Inc. Page 25 1 I believe it has some very appealing 2 attributes. 3 But I also believe that for this 4 report to have the greatest impact it needs to 5 be more complete. The report needs to address 6 the criticisms head on and include a complete 7 assessment of challenges and potential 8 obstacles to implementation in California. 9 To close, I would like to say we 10 have a unique opportunity to consider reforms 11 of process safety, not only in California but 12 across the Nation. 13 The multi-agency working group 14 established under the Executive Order 13650 15 specifically asked for input on whether OSHA 16 and EPA should consider implementation of a 17 Safety Case regulatory model. 18 Additionally, OSHA has an open 19 request for information regarding the PSM, 20 process safety management requirement. A 21 strengthened CSB report could provide near- 22 term solutions as well as a path toward

202-234-4433 Neal R. Gross and Co., Inc. Page 26 1 broader reform. Thank you. 2 (Applause) 3 CHAIRPERSON MOURE-ERASO: Thank 4 you, Member Griffon. Following the agenda, we 5 have another request from the various elected 6 officials and the representatives to address 7 this group. 8 The first person that I would like 9 to give their statements is Mayor McLaughlin, 10 Mayor of the City of Richmond. So Mayor 11 McLaughlin? 12 (Applause) 13 MAYOR MCLAUGHLIN: Hello. 14 Welcome, everyone. I want to welcome you all, 15 the community, everyone here, the 16 organizations. 17 I want to thank the CSB for 18 holding your public meeting here. I want to 19 thank the CSB staff for your long, hard hours 20 in investigating this and, of course, the 21 Board in their review and investigation of all 22 the matters that are related to the oil

202-234-4433 Neal R. Gross and Co., Inc. Page 27 1 industry's problems and impact to that. 2 We feel, in Richmond, and we know 3 other areas of the Bay, and other areas of 4 California and our Nation suffer from it as 5 well. 6 Now, the Richmond Chevron Refinery 7 is the second largest oil refinery in the 8 State of California and the largest in the Bay 9 area. And in Richmond, our residents have 10 suffered decades of severe consequences from 11 its presence. 12 For too long, we've lived in the 13 shadow of this polluting industry, suffering 14 the impact of what comes out of the smoke 15 stacks. And it's rained into our air and into 16 our lungs. And we've suffered the impact of 17 incidents that have sent us into our homes 18 sheltering in place. 19 So I'm here today to stand with 20 community members, community organizers, and 21 responsible members of the scientific 22 community to say that it's essential that the

202-234-4433 Neal R. Gross and Co., Inc. Page 28 1 oil industry be held accountable to us. 2 Children in Richmond already 3 suffer disproportionately from severe asthma. 4 They are hospitalized for this condition at 5 twice the rate of children throughout the 6 County. 7 After August 6th, 2012, the day of 8 the fire, time and time again I have heard 9 testimony from residents about how the fire 10 has impacted their lives, burning eyes, 11 breathing difficulties, other respiratory 12 problems and concerns about other very, very 13 serious symptoms as well. 14 In fact, we know over 15,000 15 residents went to local hospitals with a host 16 of serious symptoms. And, of course, 19 17 workers nearly escaped with their lives. So 18 we know that this was a horrible incident. We 19 know that the horrible black plume of toxins 20 spread across Richmond and way beyond. 21 It's great that the CSB staff has 22 recommended such a progressive and aggressive

202-234-4433 Neal R. Gross and Co., Inc. Page 29 1 approach to safety. That is what is needed in 2 our community that has suffered for too long 3 with the risk and health impact of this 4 refinery. 5 So I'm very grateful to the CSB 6 staff for its work on investigating the fire 7 of 2012 which, by the way, was only the most 8 recent of dozens of incidents that have 9 occurred from Chevron Richmond refinery over 10 the past 20 years. 11 They are recommending, as you 12 heard, the Safety Case regime which is already 13 used in European countries. It's used by the 14 U.S. Nuclear Regulatory Commission, and it's 15 used by NASA. It needs to be used by the oil 16 industry as well. 17 It shifts the focus to prevention, 18 and it shifts the burden to the industry. We 19 want the industry to show us how major hazards 20 and risks will be reduced as low as reasonably 21 practicable. The industry needs to move from 22 a reactive approach to a preventative

202-234-4433 Neal R. Gross and Co., Inc. Page 30 1 approach. And that's exactly what's being 2 recommended. 3 Now, these recommendations are 4 very important to us here in Richmond. 5 Because we have a long history of an 6 environmental justice movement. And this new 7 Safety Case is absolutely what is needed. 8 And we should not move forward 9 with any permits for any projects of any oil 10 industry, I should say, not only of any 11 projects here at the Richmond Chevron 12 Refinery. We should not move forward with any 13 permits until the Safety Case regime is 14 implemented. 15 (Applause) 16 MAYOR MCLAUGHLIN: And I want to 17 say that that's already being worked on in 18 terms of the Industrial Safety Ordinance. I 19 know the Health Department in the County is 20 working and the community groups. And I will 21 be supporting that we intensely insert into 22 this ordinance the Safety Case regime.

202-234-4433 Neal R. Gross and Co., Inc. Page 31 1 And I know we have our Vice-Mayor 2 and Council Member, Council Member Rogers, 3 Vice-Mayor Beckles, that are on our committee 4 to review the ISO, the Industrial Safety 5 Ordinance. And that is what I know I will be 6 looking for in that ordinance. 7 So I want to end with basically 8 saying, you know, in Richmond, we're on the 9 cutting edge of a lot of progressive issues. 10 And that's because we want nothing short of 11 environmental justice, economic justice and 12 social justice. 13 We have no choice. This is our 14 home. We're the ones that hear the sirens. 15 We're the ones that are forced to pull our 16 kids off the streets when the sirens go off 17 and come into the homes and, you know, duct 18 tape the doors and the window and stay in our 19 homes, as if we're in prison, until we're told 20 all's clear, never knowing how much harm is 21 out there, what the toxins are, what the risk 22 is to us, and our children and grandchildren.

202-234-4433 Neal R. Gross and Co., Inc. Page 32 1 We're the ones that cannot stand 2 by and let an incident like what happened on 3 August 6th, 2012, ever, ever happen again. 4 Chevron is a multi-billion dollar 5 company. It has the means to do what is right 6 in a preventative way. So we know they can do 7 a whole lot better. We call on the Board to 8 please know that this is right for our 9 community. 10 We will move ahead anyway, 11 regardless. But we call on you to do what is 12 necessary for our rights, our safety and our 13 health. And so we will move forward to do the 14 right thing for our community with the elected 15 officials who are committed to stand by our 16 community. 17 We thank you for your 18 investigation. We hope you vote to move 19 forward with all the recommendations. And 20 with that, we call on Chevron to do better, 21 because we demand it of you. 22 (Applause)

202-234-4433 Neal R. Gross and Co., Inc. Page 33 1 CHAIRPERSON MOURE-ERASO: Thank 2 you very much, Mayor McLaughlin. The next 3 person is the Vice-Mayor Beckles. 4 (Off microphone discussion) 5 VICE-MAYOR BECKLES: Good evening, 6 everyone. So glad to see so many faces here 7 tonight supporting our community. That's 8 really a beautiful thing. So my name is 9 Jovanka Beckles. I'm the current Vice-Mayor 10 of the City of Richmond. 11 You know, for many years the only 12 places that people of color could afford or 13 were welcome in were the areas that others 14 regarded as too dangerous or too unpleasant. 15 So it's no surprise that the 16 makeup of the community closest to Chevron is 17 disproportionately people of color and low 18 income individuals. It's also no surprise 19 that we have to fight so hard to get Chevron 20 to take the steps that truly protect these 21 communities. 22 Now, how many of you know that,

202-234-4433 Neal R. Gross and Co., Inc. Page 34 1 you know, if this corporation might be a 2 little bit more motivated if its executives 3 lived right next to the refinery. How many of 4 you -- 5 (Applause) 6 (Off microphone discussion) 7 VICE-MAYOR BECKLES: Exactly. 8 But in reality, the social factors that lead 9 the world of the community are not really 10 relevant. 11 The fact is that there is now a 12 community in close proximity to a very 13 dangerous operation. And the needs of people 14 must always come first or we all lose our 15 humanity. 16 We are not just talking about the 17 big events like that of August 12th that could 18 have blown up this community. And it did 19 considerable health damages to our community. 20 But we're talking about the smaller events 21 that don't make the news, the leaks or the 22 flaring that put greater amounts of toxic

202-234-4433 Neal R. Gross and Co., Inc. Page 35 1 chemicals into the air of people who are 2 already suffering from high asthma rates. 3 The Chemical Safety Board has 4 identified the problem as not just one of 5 Chevron's neglects. The CSB is saying that we 6 don't have a regulatory system that actually 7 protects us from the dangers inherent in the 8 refinery process. 9 The Board is recommending a 10 doctrine of a more rigorous safety management 11 program for refineries in California, 12 specifically, well, the talk of the framework 13 that's already being done in the U.K. 14 However, as a member of the 15 committee, the safety ordinance committee, I'm 16 insisting, I'm insisting that the Safety Case 17 procedures be implemented in the ISO for 18 Contra Costa County. 19 Now, this would be the first step. 20 We realize that. Board Member Rosenberg is 21 actually correct, because without a stronger 22 (inaudible) that represents the people and not

202-234-4433 Neal R. Gross and Co., Inc. Page 36 1 corporations can this protect us. 2 So I thank you all so much for 3 being here and a big, big thank you, big thank 4 you to the Chemical Safety Board for your work 5 on behalf of us. And we certainly hope you 6 will vote on behalf of us. Thank you. 7 (Applause) 8 CHAIRPERSON MOURE-ERASO: Thank 9 you, Vice-Mayor Beckles. I would like to go 10 now to Barbara Johnson from the Office of 11 Congressman George Miller. Ms. Johnson? 12 (Off microphone discussion) 13 MS. JOHNSON: Thank you very much 14 for the opportunity to bring Congressman 15 Miller's message to you here tonight. It's a 16 little lengthy, so I'll get right to it. 17 "Dear Chairman Moure-Eraso, 18 Members Griffon and Rosenberg, I want to thank 19 the CSB for coming back to Richmond. I regret 20 that I'm unable to be there this evening, as 21 we have votes in Washington, D.C. today. 22 "I'm grateful to the CSB for

202-234-4433 Neal R. Gross and Co., Inc. Page 37 1 breaking ground on the discussion over Safety 2 Case model as a possible alternative to the 3 existing regulatory framework that is failing 4 to prevent all too frequent major accidents, 5 and fires and releases from oil refineries. 6 "There are objective indicators 7 worth noting. Financial losses at U.S. 8 refineries which pour into insurance data have 9 been three times higher than in European Union 10 countries and the Far East. 11 "What is new and different about 12 the Safety Case is that facilities must 13 demonstrate to an expert regulator that they 14 have assessed major accident hazards, have put 15 in place barriers and safety management 16 systems and that these systems are working. 17 Importantly, this demonstration is tied to 18 consent to operate. 19 "According to experts, the Safety 20 Case model has reduced major accidents at 21 offshore oil platforms. However, what is of 22 particular interest is this, have major

202-234-4433 Neal R. Gross and Co., Inc. Page 38 1 accidents been reduced at the oil refineries 2 after the Safety Case regime was implemented. 3 It would be helpful if CSB could provide that 4 data to clarify that point. 5 "While this report lays a valuable 6 foundation for further discussion on processes 7 and safety reforms, I would be remiss if I did 8 not note that there are near-term 9 opportunities for improvement in Cal/OSHA and 10 the Contra Costa County Health Services 11 programs that were excluded from the CSB 12 report. I would respectfully ask that you 13 consider these changes prior to finalizing 14 this report. 15 "Before we examine the role of 16 regulators, it's important to keep in focus 17 that the root cause of the August 6th, 2012, 18 fire was, at its core, a management systems 19 failure. 20 "We know that there was failure to 21 conduct inspections with 100 percent of piping 22 at risk for sulfidation corrosion as called

202-234-4433 Neal R. Gross and Co., Inc. Page 39 1 for in Chevron's internal procedures and in 2 industry guidance. Why did management fail to 3 adopt these recommendations from its 4 metallurgists and materials engineers? 5 "Chevron is filled with 6 extraordinary engineering expertise, but to 7 this day it remains puzzling how knowledge 8 about catastrophic failures caused by 9 sulfidation corrosion, coupled with red flags, 10 were not credited in the decision making 11 process that allowed paper-thin piping to 12 remain in use. 13 "It has been nearly a year since 14 Cal/OSHA assessed nearly a $1 million fine 15 against Chevron. It is the largest fine in 16 Cal/OSHA's history. 17 The agency issued 25 citations, 18 including 11 in the most serious category 19 designated as willful and serious. Those 20 include Chevron not following its own policies 21 to replace the corroded pipe, not implementing 22 its own emergency procedures and pervasive

202-234-4433 Neal R. Gross and Co., Inc. Page 40 1 violations in leak repair procedures such as 2 the failure to replace pipe clamps at the 3 turnaround or sooner. 4 "Clamps are commonly used as 5 temporary repairs to allow refineries to fix 6 leaking pipes without having to shutdown the 7 operation. But they are just that. They're 8 temporary. 9 "Cal/OSHA found Chevron left 10 clamps in place far longer than the previous 11 turnaround in violation of well-accepted 12 industry guidance. Cal/OSHA ordered the pipe 13 clamps to be replaced by March 4th, 2013. 14 "Yet ten months later, I'm advised 15 that some of the clamps put on valves and 16 pipes carrying hydrocarbons and hydrogen have 17 yet to be replaced and that Chevron will not 18 replace these until the next turnaround in 19 late 2014. 20 "This begs a number of questions. 21 Why is this the case nearly a year after 22 Chevron was cited? Who has assessed whether

202-234-4433 Neal R. Gross and Co., Inc. Page 41 1 there is an acceptable risk of keeping these 2 clamps in place? 3 "Under the California labor code, 4 an employer is not obligated to correct a 5 Cal/OSHA safety violation if they file an 6 appeal. Chevron appealed its citations on 7 February 19th, 2013, and the legal requirement 8 to correct these violations has now been 9 blocked until the litigation is completed. 10 Litigation can take years to resolve. 11 "The California model is not the 12 only model. Oregon and Washington State both 13 require timely abatement when an appeal is 14 filed while giving employers due process 15 rights. 16 "Assembly Member Nancy Skinner and 17 Senator Loni Hancock have passed a bill last 18 year that requires employers to correct 19 serious and willful safety violations while 20 litigating appeals unless they can demonstrate 21 to Cal/OSHA or a judge that the health and 22 safety of workers will not be adversely

202-234-4433 Neal R. Gross and Co., Inc. Page 42 1 affected by postponing the abatement. 2 "This framework ensures affected 3 workers and their unions have a voice in that 4 decision. Regrettably, this bill was vetoed 5 by the Governor. 6 "I would respectfully add that the 7 CSB, prior to finalizing this regulatory 8 report, assess the issue of timely abatement 9 and consider making recommendations to the 10 Legislature and the Governor on this matter. 11 "This should not be a new issue, 12 as my staff raised this issue with the CSB 13 last October. Further, timely abatement will 14 be an issue whether or not Safety Case regime 15 is adopted. 16 "An employer's ability to 17 effortlessly block timely abatement during the 18 pending of an appeal is at fundamental odds 19 with worker and public protection. 20 "The failure to close this 21 loophole and require abatement while employers 22 litigate led to the needless deaths of two

202-234-4433 Neal R. Gross and Co., Inc. Page 43 1 barge track workers near Pleasanton last year. 2 "In the opinion of many experts, 3 Contra Costa has the best Industrial Safety 4 Ordinance at the County level anywhere in the 5 country. 6 "When the fire broke out on August 7 6th, 2012, and a shelter in place order was 8 issued, the CSB deployed to assess what went 9 wrong but also advised my office that, in 10 light of this release, they wanted to see if 11 the Industrial Safety Ordinance and Contra 12 Costa's Health Services program had 13 opportunities for improvement. 14 "I was pleased that CSB provided 15 Contra Costa County and the City of Richmond 16 with two recommendations regarding the Safety 17 Case ordinance, ISO, in its interim report. 18 "I understand Supervisor John 19 Gioia and Richmond City officials are working 20 diligently to implement these recommendations, 21 particularly strengthening requirements for 22 process hazard analysis and demonstrating the

202-234-4433 Neal R. Gross and Co., Inc. Page 44 1 use of inherently safer systems. 2 "CSB staff has identified other 3 gaps in the Contra Costa safety program. 4 However, recommendations were not included in 5 the regulatory report before us today. These 6 include the need for Contra Costa Health 7 Services to have direct enforcement authority 8 under the Industrial Safety Ordinance. 9 "Since enforcement under the ISO 10 has to be referred to the district attorney 11 and his office has to decide whether to bring 12 such action in court, enforcement actions are 13 rare at best. 14 "When inspectors do find 15 violations, they are generally limited to 16 issuing recommendations. By contrast, Contra 17 Costa Health Services has authority to 18 directly enforce the California Accidental 19 Release Program regulations. 20 "It is logical to expand the 21 County's enforcement authority and also cover 22 the ISO. Now, the CSB assessed whether the

202-234-4433 Neal R. Gross and Co., Inc. Page 45 1 ISOs could be more effective if Contra Costa 2 Health Services had the authority to bring 3 enforcement actions on its own instead of 4 making recommendations when violations are 5 identified. 6 "If so, it's timely to issue a 7 recommendation that could strengthen," I'm 8 sorry. "If so, is it timely to issue a 9 recommendation that could strengthen the 10 enforcement? 11 "The need for added resources to 12 assure comprehensive facility inspections, the 13 hazardous materials program has a budget of 14 only $1.2 million and was allocated a mere 15 five employees to carry out inspections in the 16 seven major facilities covered on the ISO plus 17 38 other facilities covered under CalARP. 18 "As a result, hazardous materials 19 program officials can only inspect a fraction 20 of the operating units in refineries. 21 "CSB's report identified low 22 salaries as a barrier to fill in vacant

202-234-4433 Neal R. Gross and Co., Inc. Page 46 1 positions. Due to low salaries, one in five 2 positions has been vacant for three years. It 3 would be helpful if CSB could assess and make 4 specific recommendations regarding appropriate 5 levels of staffing, options for funding 6 sources, such as increasing fees, and the need 7 for adequate salaries to attract and retain 8 qualified engineers. 9 "The cornerstone of the Safety 10 Case is the authority for regulators to 11 require operators to raise the bar on safety 12 performance as new technology, scientific 13 findings and management systems are developed. 14 "CSB identified a weakness in the 15 County hazards materials program which limits 16 its compliance reviews to the regulations and 17 does not generally go beyond these, even when 18 there's well established data that shows that 19 the risk can be feasibly reduced. 20 "It would be helpful if CSB could 21 provide recommendations that would strengthen 22 the ISO by authorizing the hazardous materials

202-234-4433 Neal R. Gross and Co., Inc. Page 47 1 program officials to require refineries to 2 adopt best industry practices or standards as 3 part of its toolkit. 4 "In conclusion, I want to thank 5 CSB for coming back to Richmond, sharing its 6 expertise and ideas for reforms. I believe 7 the Safety Case merits consideration by the 8 state. And I'm pleased that the Governor's 9 Refinery Task Force will be studying it 10 carefully. 11 "At the same time, I would ask 12 that the CSB strengthen the recommendations in 13 this draft regulatory report by making 14 findings and recommendations to require timely 15 abatement as part of the California labor code 16 and to improve the Industrial Safety 17 Ordinance. 18 "These added measures, if adopted, 19 would provide near-term protections that 20 workers and residents need and deserve. 21 Sincerely, George Miller, Member of Congress." 22 Thank you very much for your time.

202-234-4433 Neal R. Gross and Co., Inc. Page 48 1 (Applause) 2 CHAIRPERSON MOURE-ERASO: The next 3 elected official is a representative of 4 Supervisor, John Gioia, Mr. Terrance Cheung. 5 MR. CHEUNG: Good evening, 6 Supervisor Gioia regrets he cannot be here 7 this evening. He's in Sacramento attending to 8 some county matters. 9 "Dear Chairman Moure-Eraso and 10 Members Griffon and Rosenberg, I want to thank 11 the U.S. Chemical Safety Board for its 12 thorough investigation and interim 13 recommendations regarding the August 2013 14 Chevron fire. 15 "The protection of residents and 16 workers around refineries can be improved and 17 more needs to be done to stop major fires, 18 accidents and releases. Our community 19 deserves nothing less than the safest 20 facilities possible. 21 "As a member of the California Air 22 Resources Board, the Bay Area Air Quality

202-234-4433 Neal R. Gross and Co., Inc. Page 49 1 Management District and the Contra Costa 2 County Board of Supervisors, I appreciate the 3 proactive role taken by the CSB to make 4 recommendations to improve our local 5 regulations with a goal of improving safety. 6 "Let me assure you that the March 7 2013 interim report's recommendations to 8 strengthen our local industry Industrial 9 Safety Ordinance to require the use of 10 inherently safer systems have been taken 11 seriously. 12 "A joint committee of city and 13 county officials has worked to draft 14 amendments to the ISO to implement your 15 recommendations. And I expect that those 16 amendments will go before the Board of 17 Supervisors and City Council in the next 18 months for adoption. 19 "The December 2013 draft final 20 report discussion on whether a better 21 regulatory model, such as a Safety Case 22 regime, could improve refinery safety

202-234-4433 Neal R. Gross and Co., Inc. Page 50 1 performance is important and should be 2 considered. 3 "The frequency of major refinery 4 accidents in the U.S., including here in 5 California, makes it timely to re-examine 6 whether there are more effective regulatory 7 models. 8 "However, there are some other 9 immediate opportunities to improve our local 10 Industrial Safety Ordinance that you may want 11 to consider in your recommendations. 12 "Many refinery safety experts, 13 including your own CSB staff, believe that 14 Contra Costa County has the most effective 15 Industrial Safety Ordinance in the United 16 States. 17 "CSB staff has identified other 18 areas that could be strengthened in our local 19 Industrial Safety Ordinance but are not 20 included in your draft report. I believe your 21 report should consider further discussion and 22 recommendations regarding these issues.

202-234-4433 Neal R. Gross and Co., Inc. Page 51 1 "First, the most effective 2 enforcement would be accomplished if Contra 3 Costa County Health Services had direct 4 enforcement authority under the ISO. 5 "Currently, enforcement of the ISO 6 is referred to the district attorney who has 7 the discretion to bring enforcement actions in 8 Court. Under the existing provisions of the 9 ISO, violations discovered by inspectors are 10 generally addressed through recommendations. 11 "Contra Costa Health Services does 12 have direct authority to enforce the 13 California Accidental Release Program 14 regulations, CalARP. It would make sense to 15 expand the county's enforcement authority to 16 include the ISO to correspond with its direct 17 enforcement authority under CalARP. 18 "Second, additional resources are 19 needed to assure comprehensive inspections, as 20 the County Hazardous Materials Program 21 officials can only inspect a fraction of the 22 operating units in refineries.

202-234-4433 Neal R. Gross and Co., Inc. Page 52 1 "The existing $1.2 million 2 Hazardous Materials Program budget only 3 supports five professional staff to conduct 4 inspections of the nine major facilities 5 covered under the ISO and the other 36 6 facilities covered under the California 7 Accidental Release Prevention Program. 8 "CSB staff has identified low 9 salaries as a barrier to filling the long 10 vacant positions and the need for individuals 11 with sufficient expertise. 12 "Having CSB make specific 13 recommendations regarding the need for 14 additional resources and appropriate levels of 15 staffing and salaries would help support local 16 action to raise the fees needed to properly 17 fund the vital program. 18 "Third, potential expansion of the 19 ISO to authorize improvements which go beyond 20 the regulations. The existing Industrial 21 Safety Ordinance limits its compliance review 22 to the regulations.

202-234-4433 Neal R. Gross and Co., Inc. Page 53 1 "I would ask that the CSB further 2 analyze and consider recommendations to 3 strengthen the ISO by authorizing Contra Costa 4 Health Services to require refineries to adopt 5 the best industry practices or standards as 6 opposed to simply asking such facilities to 7 consider such improvements. 8 "Let me briefly address the 9 Governor's work group on refinery safety. To 10 his credit, Governor Brown has established a 11 work group to look at refinery safety. The 12 work group issued a draft report in July of 13 2013 that included many recommendations to 14 address refinery safety and responding to 15 refinery accidents. 16 "A task force composed of federal, 17 state, local agencies has been formed to 18 address the findings of the report. The task 19 force will be making changes to the 20 regulations that will include addressing the 21 findings from the CSB's interim report on the 22 August 2012 Chevron fire investigation. The

202-234-4433 Neal R. Gross and Co., Inc. Page 54 1 task force will also be investigating the 2 implementation of the Safety Case regime for 3 California. 4 "I thank the CSB for supporting 5 the effort of the task force by loaning a CSB 6 employee to assist the task force. 7 "In conclusion, I want to thank 8 you for all your efforts to improve the safety 9 of workers and community and sharing your 10 staff, and expertise and thoughts. 11 "I encourage the Chemical Safety 12 Board to build upon the foundations set forth 13 in your August 2013 draft report by making 14 additional recommendations where the ISO can 15 be strengthened immediately. 16 "The issuance of your final report 17 presents an immediate opportunity to make 18 further recommendations to improve the current 19 regulatory structure to achieve near-term 20 improvements in safety. 21 Yours very truly, Supervisor John 22 Gioia, Contra Costa County." Thank you.

202-234-4433 Neal R. Gross and Co., Inc. Page 55 1 (Applause) 2 MR. CHEUNG: An electronic copy of 3 this was sent to Hillary early this afternoon. 4 CHAIRPERSON MOURE-ERASO: Thank 5 you. Thank you to Mr. Gioia and to you, Mr. 6 Cheung. I appreciate your presentation. 7 And the last person from elected 8 officials that I have here is an old friend 9 from CSB, Mr. Jim Rogers. And he has a 10 question. 11 (Off microphone discussion) 12 MR. ROGERS: Thank you. My name 13 is Jim Rogers. I'm a member of the Richmond 14 City Council, also a member of the joint 15 city/county committee that is charged with 16 developing recommendations to improve our 17 current county ISO. 18 I want to comment on, there are a 19 number of very thoughtful comments that I 20 heard, but one of them I just want to 21 emphasize. It's really worth repeating. 22 One of the comments we heard

202-234-4433 Neal R. Gross and Co., Inc. Page 56 1 tonight was that regardless of the plan, if 2 there's not people keeping after it, 3 enforcing, bird-dogging, whatever, it's not 4 going to work very well. I don't care whether 5 it's process safety management, whether it's 6 Safety Case, whatever it is, it's not going to 7 work well. 8 And the reality is that the 9 political system with refineries is that we 10 have an explosion, people pay attention. And 11 it's really important, I think, not just to 12 pay attention in the year or two after we have 13 the explosions, and the fires and the 14 releases, but to pay attention every year. 15 Because these things are a time 16 bomb ticking. And it's important that we 17 don't forget about it. You know, maybe we go 18 two, or three, or four years, five years, 19 whatever, with no incident. Well, it's still 20 a problem. And we still need to be vigilant. 21 So I'm proud that our community's 22 here, and there is concern about this. There

202-234-4433 Neal R. Gross and Co., Inc. Page 57 1 is a lot of thought going into it. And it's 2 a topic that needs a lot of thought. 3 And I think we're here tonight, we 4 have people who are clearly only interested in 5 safety. And there's different opinions about 6 the Safety Case idea as far as whether it's 7 actually ready for prime time or that it needs 8 to be looked at, et cetera, et cetera. 9 We have a very good ordinance in 10 the ISO. As a county supervisor many years 11 ago, as the author of the precursor which was 12 the Good Neighbor Ordinance that was replaced 13 by the ISO, and I think that even though it is 14 a good ordinance, compared to other parts of 15 this Country, it obviously didn't get the job 16 done on August 6th. 17 So we need to make changes. We 18 have made progress in the committee. We have 19 adopted many of the recommendations that we've 20 heard so far from the CSB. I at least am 21 hearing some tonight that I wasn't aware of. 22 And I will be taking those back to the

202-234-4433 Neal R. Gross and Co., Inc. Page 58 1 committee for looking at including them. 2 A couple of those would be getting 3 a better way to ensure that we do have 4 adequate enforcement. And to me it's pretty 5 simple. Chevron simply needs to pay for it. 6 And that's just the end of the story. 7 If there's regulation, whether 8 it's a question of more bodies or better paid, 9 more highly qualified bodies, whatever it is, 10 Chevron needs to pay for it. 11 And the CSB is right on target 12 that you should have people who have the same 13 level of professionalism and training as the 14 people in the industry side that they're 15 dealing with. I think that's a great 16 recommendation and one that we should be 17 supporting. 18 The timely abatement issue is one 19 which we need to look at. I believe we have 20 the authority to do that as part of our police 21 power here. And I will certainly be 22 recommending that to the committee.

202-234-4433 Neal R. Gross and Co., Inc. Page 59 1 The direct enforcement by County 2 staff is another good idea. Again, I will be 3 bringing it up to the committee as a 4 suggestion for something that we should 5 pursue. 6 When we are looking at these 7 issues, I think it's important to remember 8 (phonetic) that are a lot of very complicated 9 details. 10 And we've heard tonight that there 11 are people like Congressman Miller, some of 12 the union leaders who were mentioned earlier, 13 your Board has some different ideas about a 14 very complicated question about whether the 15 Safety Case regime is ready to be rolled out. 16 And I certainly respect those differences. 17 I think that if we're going to try 18 and move forward with this, I think that it's 19 important that we move forward in a united 20 front. 21 I think if we move forward in a 22 situation where some people are saying, yes,

202-234-4433 Neal R. Gross and Co., Inc. Page 60 1 we're ready for Safety Case and then a 2 majority of your Board says, no, you're not 3 quite ready, Congressman Miller doesn't think 4 we're ready, I frankly don't think that's 5 going to go very well. 6 And so my suggestion would be to 7 really do a full court press, try to work 8 through these issues, try to deal with some of 9 the flaws that were seen in the report, 10 provide perhaps some of the safeguards so that 11 the Safety Case doesn't become just another 12 paper shuffle as is what obviously happened 13 prior to August 6th. 14 There was lots of documentation 15 that things that should have been 16 investigated, should have been looked at under 17 our ordinance, in fact weren't. 18 And it wasn't a problem with the 19 ordinance. The ordinance said they were 20 supposed to be looked at and analyzed in a lot 21 of detail. And they weren't. They got a one 22 line, quick run over.

202-234-4433 Neal R. Gross and Co., Inc. Page 61 1 So I'm in favor of us moving 2 forward together. I think at the end of the 3 day that the Safety Case regime is a more 4 promising way to go. And I think that we 5 should be moving towards that. 6 At the same time, as Supervisor 7 Gioia indicated in his statement, that doesn't 8 mean that we can't move forward immediately 9 with the short term changes to our ISO to 10 improve that. 11 So I appreciate your time, 12 appreciate your effort. And I will be looking 13 forward to moving forward with the committee 14 and bringing recommendations back to the city 15 and the county to strengthen our ISO as much 16 as possible in the short term and hopefully to 17 have a united front where we can move forward 18 with the state and implement the Safety Case 19 regime. 20 CHAIRPERSON MOURE-ERASO: Thank 21 you very much. 22 (Applause)

202-234-4433 Neal R. Gross and Co., Inc. Page 62 1 CHAIRPERSON MOURE-ERASO: The next 2 part of the agenda is we are going to at last 3 hear from the horse's mouths, the people that 4 have been working for two years to put this 5 together and have done a tremendous job in 6 presenting us with two rule reports and have 7 a third on in preparation on the explosion of 8 August 2012. It is the investigative team of 9 the Chevron incident. 10 I would like to introduce our 11 director of the western office of the CSB that 12 had the investigative team under his 13 responsibility. And his name is -- a lot of 14 you have interacted with him -- is Mr. Don 15 Holmstrom. 16 And I would like to ask him to 17 introduce the members of the investigative 18 staff and to proceed with their presentation 19 of the report. So, Mr. Holmstrom? 20 MR. HOLMSTROM: Thank you, 21 Chairman Moure-Eraso. Good evening, thank you 22 for attending tonight's presentation on CSB

202-234-4433 Neal R. Gross and Co., Inc. Page 63 1 staff's presentation on the Richmond Refinery 2 accident. 3 My name is Don Holmstrom. I'm the 4 U.S. Regional Office Director. Our offices 5 are in Denver, Colorado. 6 Joining us here tonight is the 7 lead investigator, Dan Tillema, and also 8 Investigator Amanda Johnson. We will be 9 presenting findings and conclusions from our 10 draft regulatory report. 11 The report discusses the 12 regulatory gaps that exist relating to the 13 oversight of petroleum refineries in the U.S. 14 and in California. And it proposes the Safety 15 Case regime as a regulatory alternative to 16 control major hazards and reduce risk. 17 We would like to thank everyone 18 who submitted comments on the draft report to 19 the CSB. We carefully reviewed all the 20 comments and implemented changes accordingly 21 which are reflected in the report being voted 22 on by the Board this evening. And I believe

202-234-4433 Neal R. Gross and Co., Inc. Page 64 1 there's copies of those comments as well as 2 the staff response that were available on the 3 tables outside. 4 In tonight's presentation, members 5 of our investigation team will present our key 6 investigative findings followed by our 7 proposed recommendations. 8 The Board will have the 9 opportunity to ask the investigation team 10 questions. We will then hear statements by 11 the public. Finally, the Board will vote on 12 whether to adopt the draft Chevron Regulatory 13 Report and propose recommendations. 14 The need for regulatory change was 15 prompted by the August 6th, 2012, Chevron 16 incident. The seemingly small controllable 17 leak in the crude units for (inaudible) pipe 18 resulted in a very large fire at the Chevron 19 Richmond Refinery that burned for hours. 20 The pipe that was leaking was 21 actually extremely thin due to sulfidation 22 corrosion. This was not known to the

202-234-4433 Neal R. Gross and Co., Inc. Page 65 1 operations and emergency response personnel 2 who initially responded to the leak. 3 The severe thinning occurred 4 because the leaking pipe component had a very 5 low silicon content which greatly increased 6 the sulfidation corrosion rate of the steel. 7 This incident endangered the lives 8 of 19 Chevron fire fighters and operators. It 9 also impacted this community, causing over 10 15,000 residents to seek medical attention. 11 Over the last decade, there have 12 been considerable problems and significant 13 deadly incidents at petroleum refineries. In 14 2012 alone, the CSB has tracked 125 15 significant process safety incidents at U.S. 16 petroleum refineries. Seventeen of these 17 major incidents occurred in California. 18 The United States is experiencing 19 significantly more incidents at its refineries 20 in comparison with other countries. 21 Specifically, the U.S. has experienced 22 financial losses from refinery incidents that

202-234-4433 Neal R. Gross and Co., Inc. Page 66 1 are at least three times that of industry 2 counterparts in other countries. 3 The CSB has investigated some of 4 these major refinery incidents. CSB 5 investigated incidents that resulted in 6 multiple fatalities including the 1999 Tosco 7 Avon Refinery that resulted in four fatalities 8 -- that was in this County, Contra Costa 9 County, California -- the 2005 BP Texas City 10 Refinery incident that resulted in 15 11 fatalities, a 2005 Valero incident that 12 resulted in two fatalities, the 2010 Tesoro 13 Anacortes Refinery incident that resulted in 14 seven fatalities. 15 These are just a small fraction of 16 the refinery incidents that have occurred over 17 the last 15 years. 18 I will now turn over the 19 presentation to Investigator Dan Tillema to 20 discuss the key findings and conclusions of 21 the CSB's draft Chevron Regulatory Report. 22 Dan?

202-234-4433 Neal R. Gross and Co., Inc. Page 67 1 INVESTIGATOR TILLEMA: Thank you, 2 Don. CSB identified, in its Chevron 3 investigations, many causal findings that 4 allowed the core SICA (phonetic) piping at 5 the Chevron Richmond Refinery to rupture. 6 These findings highlight 7 regulatory gaps in the U.S. and California. 8 First, Chevron did not perform damage 9 mechanism hazard review to fully evaluate all 10 damage mechanisms in the refinery. 11 Second, the numerous 12 recommendations made over the years to replace 13 or inspect the Coresight(phonetic) deadlines 14 were never implemented. It just points to 15 organizational failures within Chevron. 16 Chevron also did not thoroughly 17 evaluate its process safeguards, such as 18 equipment material construction, to ensure 19 that they were effective. 20 Inherently safer design was never 21 employed prior to the incident to reduce the 22 risk from sulfidation corrosion, despite the

202-234-4433 Neal R. Gross and Co., Inc. Page 68 1 company's expertise in this area. 2 Finally, Chevron's corrective 3 actions developed from MOCs in incident 4 investigations did not effectively identify 5 and control process hazards. 6 In our presentation, we will show 7 how these process safety gaps causal to the 8 Chevron incident reflect California regulatory 9 weaknesses that could be best addressed 10 through the transition to a more rigorous, 11 performance based, regulatory approach already 12 in place around the world and in some U.S. 13 industries. 14 During the course of the Chevron 15 investigation, the CSB has found that the U.S 16 and California process safety regulatory 17 systems are ineffective which allowed 18 Chevron's process safety failures to occur. 19 The following slides identify the 20 CSB's key regulatory findings and conclusions. 21 Key Finding 1, the existing U.S. and 22 California process safety regimes rely on a

202-234-4433 Neal R. Gross and Co., Inc. Page 69 1 safety and environmental management system 2 framework that is primarily activity based 3 rather than goal based, risk reduction to as 4 low as reasonably practicable, CalARP or 5 equivalent. 6 The PSM standard does not 7 effectively establish goals to prevent 8 accidents or reduce risk. Only two of the 14 9 elements of the PSM standard, process hazard 10 analysis and mechanical integrity, contain 11 some goal setting components. 12 Key Finding 2, the existing 13 regulatory regimes for petroleum refineries in 14 the United States and California are static. 15 They're unable to adapt to innovation, newly 16 defined hazards and technical advancement. 17 Throughout the existence of the 18 Chemical Safety Board, the CSB has made a 19 number of process safety related 20 recommendations to both Federal OSHA and the 21 EPA. 22 However, none of these

202-234-4433 Neal R. Gross and Co., Inc. Page 70 1 recommendations have been implemented by these 2 agencies. In fact, there have been no 3 substantive changes made to the PSM or RMP 4 regulations in the past 20 years. 5 Key Finding 3, the existing 6 regulatory regimes for petroleum refineries in 7 the U.S. and California do not ensure 8 continuous improvement by effectively 9 incorporating lessons learned from major 10 accidents, nor do they have the authority to 11 require companies to address newly identified 12 safety issues as a result of such incidents. 13 In addition, these regimes do not 14 effectively bless or promote industry use of 15 major accident performance indicators to drive 16 industry to reduce risk or measure progress. 17 Key Finding 4, the existing U.S. 18 and California regimes do not require the use 19 or implementation of inherently safer systems 20 or the hierarchy of control. 21 Under both the PSM and RMP 22 regulations, an employer must control hazards

202-234-4433 Neal R. Gross and Co., Inc. Page 71 1 when conducting a process hazard analysis for 2 PHA of a covered process. However, there is 3 no requirement to address the effectiveness of 4 the controls or the hierarchy of control. 5 These are important concepts when 6 focusing on preventing hazards. Thus, a PHA 7 that meets the regulatory requirement may 8 inadequately identify or mitigate major hazard 9 risk. 10 Key Finding 5, the existing U.S. 11 and California regimes do not effectively 12 involve the workforce in hazard analyses and 13 prevention of major accidents. 14 For example, the CSB has found 15 that staff who were aware of sulfidation 16 corrosion impact, and others who were highly 17 knowledgeable and experienced in sulfidation 18 damage mechanism causes and hazards, were not 19 involved in the most recent crude unit PHA and 20 did not affect decisions concerning control of 21 sulfidaton corrosion during the turnaround 22 process.

202-234-4433 Neal R. Gross and Co., Inc. Page 72 1 Key Finding 6, the existing U.S. 2 and California regimes do not grant the 3 regulator the authority to accept or reject a 4 company's hazard analysis, risk assessment or 5 proposed safe guards prior to permission being 6 granted to the company who operates, which is 7 key for prevention. 8 Under the current system, the 9 regulator typically verifies compliance with 10 regulations reactively, that is following a 11 complaint or accident. 12 There is no requirement under the 13 current systems to submit PHAs to the 14 regulator. And the regulator is not 15 responsible for accepting the quality of the 16 PHA or the effectiveness of the proposed 17 safeguards. 18 And finally, Key Finding 7, the 19 existing U.S. and California regimes do not 20 employ the requisite number of staff with the 21 technical field knowledge and industry 22 experience to provide sufficient direct safety

202-234-4433 Neal R. Gross and Co., Inc. Page 73 1 oversight of petroleum refineries. CSB found 2 that there is a significant discrepancy in the 3 compensation between California regulators and 4 the Chevron Richmond Refinery personnel that 5 they interact with. 6 The CSB has addressed this issue 7 in our reports and is encouraged that the 8 California State Legislature has approved 9 funding for at least 15 new positions at 10 Cal/OSHAS's process safety unit. 11 The CSB's attempt to improve the 12 current PSM standards have been unsuccessful. 13 The regulation creation and regulation 14 updating process is too slow and burdensome to 15 be able to adequately respond to new technical 16 hazards and findings in the petroleum refining 17 industry. 18 The Safety Case regime requires 19 continuous risk reduction and is therefore a 20 better approach to preventing major accidents 21 at petroleum refineries. 22 The alternative, the occurrence of

202-234-4433 Neal R. Gross and Co., Inc. Page 74 1 a potentially catastrophic incident, is just 2 not an acceptable outcome for society. 3 In addition, the Safety Case 4 regulatory approach is already used to 5 regulate major hazards in the United States. 6 Both the nuclear industry and NASA use Safety 7 Case-like regulatory approaches. These 8 approaches require risk reduction with 9 specific targets similar to as low as 10 reasonably practicable. 11 I will now turn the presentation 12 over to Investigator Amanda Johnson to discuss 13 the Safety Case regime. 14 INSPECTOR JOHNSON: Thank you, 15 Dan. Noted process safety expert, Andrew 16 Hopkins, defines the Safety Case as a 17 verifiable case that the company makes to the 18 regulator. 19 The Safety Case includes 20 identification of hazards and their control, 21 demonstration by the company to the regulator 22 that its process safety strategy properly

202-234-4433 Neal R. Gross and Co., Inc. Page 75 1 manages risk and adoption of industry best 2 practices by the company. 3 The CSB has identified several key 4 features of the Safety Case regime shown in 5 this graphic. The first key feature we will 6 discuss is duty holder safety responsibility. 7 The duty holder must prepare a 8 written case for safety, known as the Safety 9 Case report, that identifies the hazards, and 10 risks and describes how they will be reduced 11 to as low as reasonably practicable, or ALARP. 12 The Safety Case report must 13 demonstrate how inherently safer design 14 concepts have been applied in the design 15 decision statement. 16 Safety Case reports are meant to 17 be evergreen documents that request continuous 18 improvement in risk reduction. Regulators 19 review the Safety Case report and must accept 20 them for the facility to operate. 21 In the United Kingdom, the 22 regulator reviews the Safety Case report at

202-234-4433 Neal R. Gross and Co., Inc. Page 76 1 least once every five years or sooner as 2 significant changes are made to a facility. 3 The second key feature is 4 continuous risk reduction to as low as 5 reasonably practicable or ALARP. The owners 6 and operators of covered facilities must 7 reduce risks to ALARP and demonstrate to the 8 regulator how they have done so in the Safety 9 Case report. 10 Typically, the definition of ALARP 11 is determined by best practice. So 12 ultimately, the regulator can require the 13 company to go above best practice to achieve 14 ALARP. This can occur when the industry best 15 practices are overly permissive and lack 16 minimum requirements to prevent hazards. 17 The third key feature of the 18 Safety Case regime is adaptability and 19 continuous improvement. This allows the 20 regulator to go above and beyond current 21 industry standards without requiring rule 22 making.

202-234-4433 Neal R. Gross and Co., Inc. Page 77 1 The adoption of the Safety Case 2 regulatory regime in California would allow 3 regulators to require inherently safer 4 material construction. For example, 5 regulators could require that carbon steel 6 systems and sulfidation corrosion environments 7 be upgraded to control damage mechanism 8 hazards, all without required rule making. 9 The fourth key feature of the 10 Safety Case regulatory regime is active 11 workforce participation. The Safety Case 12 regime provides for the election of safety 13 representatives and creation of safety 14 committees. 15 It also uses a triparthied 16 approach with active and equal participation 17 from the regulator, industry and labor. This 18 ensures that all factors of the workforce are 19 involved in continuous risk reduction. 20 This needs to be noted in the 21 Chevron interim report, the important role 22 transparency plays between industry and the

202-234-4433 Neal R. Gross and Co., Inc. Page 78 1 public in improving health and safety for the 2 facility and the surrounding communities. 3 The CSB recommended that 4 California establish a multi-agency process 5 safety regulatory program for all California 6 petroleum refineries to further include public 7 accountability and transparency. 8 Under the current system, key 9 records and corrective actions related to 10 refinery mechanical integrity inspection and 11 repair work arising from PHAs, turnarounds and 12 maintenance related shutdowns are not 13 currently made available to the public. 14 The CSB has found the public is 15 largely in the dark under the current case. 16 Under the Safety Case, many regimes collect 17 and require indicating data and companies are 18 required to make Safety Case report summaries 19 publicly available. 20 These are high level documents 21 that are published online and summarize safety 22 assessments, hazardous materials, hazards and

202-234-4433 Neal R. Gross and Co., Inc. Page 79 1 control measures, potential major incidents, 2 emergency response and safety management 3 systems. 4 The fifth key feature of the 5 Safety Case regime is the use of process 6 safety indicators. Currently, OSHA primarily 7 relies on recordable injury and illness rates. 8 These are personal safety measurements that 9 are not sufficient to measure the potential of 10 a major process safety incident. 11 The Safety Case regime allows 12 regulators to collect and analyze computer 13 data, release the data to the public, use the 14 data to target inspections and drive 15 continuous improvement. 16 The sixth key feature of the 17 Safety Case regime is regulatory assessment, 18 verification and intervention. The Safety 19 Case authorizes regulators to review and 20 accept or reject Safety Case reports. 21 The regulator can place a great 22 emphasis on inherently safer design and a

202-234-4433 Neal R. Gross and Co., Inc. Page 80 1 hierarchy of control when deciding to accept 2 or reject a Safety Case report. 3 The regulator also has the power 4 to reject a Safety Case report if a company 5 has not reduced risk to ALARP or as low as 6 reasonably practicable. 7 And finally, the regulator can 8 conduct (inaudible) and inspections to ensure 9 that a company is following the Safety Case 10 report. 11

12 The final key feature of the 13 Safety Case regime is ensuring a well funded 14 and qualified regulator is in place with skill 15 sets such as chemical engineering, 16 metallurgical and corrosion expertise, and 17 human factors, among others. This is 18 essential to having a highly functioning 19 Safety Case regime. 20 The regulator must be able to 21 interact with equal technical company 22 management. The regulator must also be able

202-234-4433 Neal R. Gross and Co., Inc. Page 81 1 to independently and sufficiently evaluate 2 risks identified by the company. To do this, 3 the regulator must retain technically 4 competent, experienced and well-trained staff 5 to correctly evaluate Safety Case reports. 6 Implementing the Safety Case 7 regime in California will take some time and 8 will not be an easy process. To ensure 9 effective implementation on the Safety Case 10 regime, major stakeholders must be committed 11 to the project. 12 The Safety Case report must be 13 treated as an evergreen document that 14 accurately reflects the new process hazards 15 and risks. And the Safety Case report must 16 not be treated as a check the box activity by 17 companies. 18 The transition to a Safety Case 19 regime must also be carefully planned and 20 managed. It may take several years to 21 effectively implement. 22 That concludes our investigation

202-234-4433 Neal R. Gross and Co., Inc. Page 82 1 presentation. Donald Holmstrom will now read 2 the team's proposed recommendations. 3 MR. HOLMSTROM: Thanks, Amanda. 4 The team proposes to the Board the following 5 recommendations. 6 Recommendation Number 1 to the 7 California State Legislature, the Governor of 8 California, develop and implement a step-by- 9 step plan to establish a more rigorous safety 10 management, regulatory framework for petroleum 11 refineries in the State of California based on 12 the principles of the Safety Case framework in 13 use in regulatory regimes such as those of the 14 United Kingdom, Australia and Norway, and as 15 described in this report and with the 16 following minimum components. 17 A, a case for safety written by 18 the duty holder or the employer, if you will, 19 that includes a systematic analysis and 20 documentation of all major hazards and 21 effective control methods implemented to 22 reduce those risks to as low as reasonably

202-234-4433 Neal R. Gross and Co., Inc. Page 83 1 practicable, or ALARP. 2 B, a thorough view of the Safety 3 Case report by technically competent 4 regulatory personnel that requires 5 modifications and improvements to the document 6 as necessary prior to acceptance. 7 C, audits and preventative 8 inspections by the regulators to verify 9 effective implementation of the Safety Case 10 elements. 11 D, a risk management approach that 12 requires analysis and effective implementation 13 of safeguards using the hierarchy of controls 14 to protect people and the environment from 15 major accident hazards. The effectiveness of 16 the safeguards will be demonstrated through 17 the use of leading and lagging process safety 18 indicators. 19 E, ability to adapt and implement 20 safety requirements in response to newly 21 identified hazards, advances in technology, 22 lessons learned from major accidents and

202-234-4433 Neal R. Gross and Co., Inc. Page 84 1 improved safety codes without the need for new 2 rule making. 3 F, determines when new or improved 4 industry strengths, standards and practices 5 are needed and initiates programs and other 6 activities such as forums to develop the 7 timely development and implementation of such 8 standards and practices. 9 G, used as a triparthied type 10 model where the regulator, the company, and 11 the workers and their representatives play an 12 equal and essential role in the direction of 13 preventing major accidents. 14 H, a regulatory model and 15 accompanying guidance based on the U.K.'s 16 Safety Committee regulations, 1977, and the 17 Health and Safety Consultation Employees 18 regulations, 1996, which set out the legal 19 framework for the rights and responsibilities 20 of workers and their representatives on health 21 and safety related matters, and the 22 establishment of safety representatives and

202-234-4433 Neal R. Gross and Co., Inc. Page 85 1 the establishment of safety committees to 2 serve health and safety related functions. 3 The elected representative should 4 have a legally recognized role that goes 5 beyond consultation and activities such as the 6 development of the Safety Case report, process 7 hazard analysis, management of change, 8 incident investigation, audits and the 9 identification and effective control of 10 hazards. 11 The representative should also 12 have the authority to stop work that is 13 perceived to be unsafe or that presents a 14 serious hazard until the regulator intervenes 15 to address the safety concern. 16 Workforce participation and 17 practices should be documented by the duty 18 holder and submitted to the regulator. 19 I, requires the reporting of 20 information to the public to the greatest 21 extent feasible, such as a summary of a Safety 22 Case report, a process hazard analysis, a list

202-234-4433 Neal R. Gross and Co., Inc. Page 86 1 of safeguards implemented and standards 2 utilized to reduce risk and process safety 3 indicators that demonstrate the effectiveness 4 of the safeguards in the management systems. 5 J, an independent, well funded, 6 well staffed, technically competent regulator. 7 K, a compensation system to ensure 8 the Safety Case regulator has the ability to 9 attract and retain a sufficient number of 10 employees with the necessary skills and 11 experience to ensure regulator or technical 12 competency, periodically conducting market 13 analysis and bench marking review to ensure 14 the comparison system remains competitive with 15 the California petroleum refineries. 16 Recommendation Number 2 to the 17 California State Legislature and the Governor 18 of California. Work with a regulator, 19 petroleum refining industry, labor and other 20 relevant stakeholders in the State of 21 California to develop and implement a system 22 that collects, tracks and analyzes process

202-234-4433 Neal R. Gross and Co., Inc. Page 87 1 safety leading and lagging indicators from 2 operators and contractors to promote 3 continuous safety improvement. 4 At a minimum this program shall, 5 A, require the use of leading and lagging 6 process safety indicators that actively 7 monitor the effectiveness of process safety 8 management systems and safeguards for major 9 accident prevention, including leading and 10 lagging indicators that are measurable, 11 actionable and standardized. 12 Require that the reported data be 13 used for continuous process safety improvement 14 and accident prevention. 15 B, analyze the data to identify 16 trends and poor performers and publish annual 17 reports with the data at the facility and 18 corporate level. 19 C, require companies to publicly 20 report required indicators annually at the 21 facility and corporate level. 22 D, use process safety indicators,

202-234-4433 Neal R. Gross and Co., Inc. Page 88 1 one, to drive continuous improvement for major 2 accident prevention by using the data to 3 identify industry and facility safety trends 4 and deficiencies. And two, to determine 5 appropriate allocation of regulatory resources 6 and inspections. 7 And E, be periodically updated to 8 incorporate new learnings from worldwide 9 industry improvements in order to drive 10 continuous major accident safety improvements 11 in California. 12 Recommendation Number 3, to the 13 Federal Chemical Facility Safety and Security 14 Working Group and to the Occupational Safety 15 and Health Administration. 16 This report highlights significant 17 advantages of the Safety Case regime over the 18 existing process safety management standard to 19 prevent potentially catastrophic chemical 20 accidents that are relevant to OSHA's response 21 to Executive Order 13650. 22 In the development of OSHA EO

202-234-4433 Neal R. Gross and Co., Inc. Page 89 1 response, incorporate a written plan that 2 includes the evaluation of the issues raised 3 in the findings, conclusions and 4 recommendations in this report concerning 5 Safety Case regime. 6 The CSB notes that the Safety Case 7 has now been listed by the Federal Working 8 Group as one of the options for reform under 9 the Executive Order and that they are 10 currently seeking public input. 11 That concludes our investigation 12 presentation. We would now like to take any 13 questions from the Board. Thank you. 14 CHAIRPERSON MOURE-ERASO: Thank 15 you. 16 (Applause) 17 CHAIRPERSON MOURE-ERASO: As it is 18 our custom, and after the presentation of the 19 staff, the Board members ask questions of the 20 staff about the report. So I would like to 21 start with Board Member Griffon if you have 22 any questions for them.

202-234-4433 Neal R. Gross and Co., Inc. Page 90 1 MEMBER GRIFFON: I'll keep it 2 brief, because I think we probably have quite 3 a few people that want to make public 4 comments. 5 I was looking at your slide. I 6 wish I had the slide number, talking about 7 publicly reported process safety indicators 8 data. And I wondered what do we know about 9 the performance of, did we look at any of 10 these metrics with regard to refineries? 11 I know there's some stuff in here 12 on the offshore experiments. But if it's 13 detailed indicator data, did we look at this 14 for refineries? And what did it show, or 15 should we include it in the report? 16 MR. HOLMSTROM: The report looks 17 at the different countries and the indicators 18 or reports on it, for Norway, for example, it 19 reports that Norway has noted a significant 20 decrease in hydrocarbon releases offshore. 21 The PSAs, the regulatory agency 22 that manages safety both onshore and offshore

202-234-4433 Neal R. Gross and Co., Inc. Page 91 1 in Norway also has some preliminary numbers 2 from onshore that look favorable. But they 3 have not released those. 4 In conversation with them, they 5 said that they believe the regime is headed in 6 the right direction. But they do not have 7 their, system for implementing those 8 indicators has not been in place long enough 9 for them to publish definite numbers in that 10 regard. 11 In the United Kingdom, they have a 12 much more lengthy period of using indicators 13 offshore. They have, for example, tracked 14 hydrocarbon releases which would be an issue 15 that would be both an issue for offshore oil 16 and gas production and onshore processing. 17 And they found offshore that 18 they've noted a decline in the number of 19 hydrocarbon releases that's fairly significant 20 over a number of years. Onshore, the COMAH 21 has put into, which is the onshore program for 22 major accident prevention, they put in place

202-234-4433 Neal R. Gross and Co., Inc. Page 92 1 an indicator program that's being implemented 2 over time. 3 The first phase of that 4 program is to require that the onshore duty 5 holders or employers collect data internally 6 that will be revealed to COMAH when they visit 7 the facility or if there's an intervention or 8 inspection. 9 And they plan by, I think, 2015 to 10 have a program in place where they'll report 11 that data to the regulator which currently 12 isn't in effect. 13 So the offshore program's much 14 more developed. I think one of the major 15 underpinnings that has been raised earlier was 16 that there's some significant difference 17 between onshore and offshore safety. 18 Particularly it involves production systems, 19 offshore versus refining offshore. 20 A lot of the same equipment, 21 there's separation that's occurring, there's 22 exchangers, there's valves, there's pressure

202-234-4433 Neal R. Gross and Co., Inc. Page 93 1 vessels, control valves, et cetera. So 2 releases offshore of hydrocarbons on a 3 production platform would have some of the 4 similar process safety issues as you would 5 have in a process plant. And so we think that 6 those sorts of examinations are issues 7 offshore. 8 Certainly, all those countries we 9 just named believe the Safety Case is an 10 appropriate regime onshore or offshore and has 11 implemented it in both areas, sometimes in 12 steps over time. 13 But certainly, as it exists now, 14 the system is fairly widespread throughout the 15 world, we would note, including recently the 16 Presidential Oil Spill Commission which was a 17 bipartisan commission recommending the Safety 18 Case for offshore production in the United 19 States. 20 MEMBER GRIFFON: And just a 21 follow-up, Don. Is there any reason why the 22 refinery sector seems to be lagging the

202-234-4433 Neal R. Gross and Co., Inc. Page 94 1 offshore in reporting stuff currently, or were 2 there programs put in place -- 3 MR. HOLMSTROM: I think the 4 programs were put in place later, as we 5 understand it. And we can, you know, we can 6 certainly provide you with that data. We have 7 an actual document related to the 8 implementation of the COMAH program. 9 And the other issue is COMAH 10 typically, I'm sure if you submitted an 11 inquiry to them they could provide that data. 12 But they have actually much broader coverage 13 under the COMAH program than just oil 14 refineries, not only chemical plants but 15 beyond even what's covered under the process 16 safety management program in the United 17 States. 18 For example, they cover chemical 19 storage facilities, storage tanks, large 20 storage tanks. We're obviously investigating 21 one of those right now in West Virginia. 22 They also cover power plants. We

202-234-4433 Neal R. Gross and Co., Inc. Page 95 1 investigated the Clean Energy incident. So 2 it's a much broader coverage of what they 3 consider to be higher hazard facilities than 4 is covered under, currently on our PSM and RMP 5 in the United States. 6 MEMBER GRIFFON: And my last 7 question is did we, I know this is difficult 8 given the locations of these regimes, but in 9 preparation for this meeting I was attempting 10 to review a full Safety Case report. And I 11 think I stumbled upon one that I could get my 12 hands on. 13 Most of them, as you said in your 14 presentation, the summary reports are publicly 15 available, but the full reports aren't. I 16 found one for offshore. 17 I was just curious if it's 18 (inaudible), and I understand it's 19 international travel. But did we get an 20 opportunity to review any Safety Cases for 21 refineries or actually get, you know, on scene 22 and see how they're actually implemented?

202-234-4433 Neal R. Gross and Co., Inc. Page 96 1 You know, as I went through this 2 offshore one, it strikes me also, it makes me 3 wonder about the worker involvement component. 4 There's some very high level analysis in a lot 5 of these documents. And it strikes me that, 6 you know, how are the workers really going to 7 be "involved" in blessing these things, so to 8 speak? 9 So I'm not sure. I think maybe in 10 these regimes the worker involvement component 11 is a bit overstated. And it might be an 12 improvement, but I just wonder about that, if 13 you've have visited any of these facilities 14 yet? 15 MR. HOLMSTROM: Okay. I'm glad 16 you brought up both of those points. Because 17 I think, while there may be different views on 18 these issues, I think the recommendations 19 address them explicitly. 20 So let me first say that, in terms 21 of the question of the Safety Case, we have 22 received, I think, a good part of, there's a

202-234-4433 Neal R. Gross and Co., Inc. Page 97 1 couple of Safety Cases from one of our 2 contractors who works in Australia. And we 3 have reviewed a couple of those. 4 But you're right, the Safety Cases 5 are not typically, as a whole, made public. 6 And one of the issues is Safety Case reports 7 can have confidential business information and 8 trade secrets in them. So that's one issue. 9 And there are Safety Case summaries that are 10 published online. 11 The second issue is the 12 involvement of the workforce. We've had 13 extensive, as you might imagine, conversations 14 with a number of unions in Australia, Norway 15 and the United Kingdom. 16 And it's very clear that they're 17 involved in a number of activities that lead 18 up to the development of the Safety Case. And 19 it's also clear that they're very supportive 20 of the Safety Case. 21 I know there was some commentary 22 earlier about possible concerns about the case

202-234-4433 Neal R. Gross and Co., Inc. Page 98 1 from unions, but if they interviewed, for 2 example, leaders of the RMP Union and Unites 3 in the United Kingdom, they clearly are 4 supportive. 5 In fact, one of the concerns that 6 those unions had was that, in a recent UE 7 initiative to implement a version of the 8 Safety Case, they defended their regime, as 9 did the industry, as being highly effective. 10 And the trade association, Oil and 11 Gas UK in the United Kingdom, defended the 12 regime as being very effective as well as both 13 of the unions I mentioned. So, in all 14 conversations, they're supportive. And 15 actually, in a CSB forum they've been very 16 supportive. 17 In terms of the participation 18 element and also the Safety Case transparency, 19 we recognize that there may be differences 20 there. But we have made it very clear in the 21 recommendations that there should be 22 significant transparency.

202-234-4433 Neal R. Gross and Co., Inc. Page 99 1 In fact, the recommendations call 2 for the involvement of the workforce in the 3 development of the safety case. 4 If there's any ambiguity or 5 differences there, clearly the recommendations 6 are calling for that, as well as a number of 7 the other elements that would lead up to the 8 development of the Safety Case. 9 The second question is about 10 transparency. We believe there is a 11 significant degree of transparency. But if 12 there may be disagreement to the extent or how 13 deep that is, we have made it very clear on 14 the recommendations that there should be 15 transparency to the public to the greatest 16 extent feasible. 17 So one of the things that's true 18 about the Safety Case is there's a number of 19 elements that one could take out of the Safety 20 Case and implement in another regime. 21 Transparency could be one. It's 22 not necessarily inherent to the Safety Case.

202-234-4433 Neal R. Gross and Co., Inc. Page 100 1 Worker participation and real empowerment's 2 not inherent, necessarily, to just the Safety 3 Case. 4 But the Safety Case as a whole 5 brings up all these strands together and I 6 think creates a stronger binding, if you will, 7 for an overall regime. 8 And clearly, in our 9 recommendations we're making it very clear 10 that we believe that transparency should be to 11 the greatest extent feasible. 12 What has always been the issue 13 with transparency -- and we deal with it all 14 the time in the CSB, because we receive all 15 kinds of documents, we like to make a number 16 of them public -- is questions about 17 confidentiality, confidential business 18 information and trade secrets. 19 And so like, for example, in our 20 BP Texas City investigation, we made public 21 about 150 documents, somewhere around there. 22 And we went through a CBI process. So we know

202-234-4433 Neal R. Gross and Co., Inc. Page 101 1 these documents can be released. 2 But sometimes it's more time 3 consuming, because you have to go through a 4 process to review any confidential business 5 information which, at least in our view under 6 typical legal analysis, it's a fairly narrow 7 analysis. And sometimes it becomes more 8 expansive when it becomes a back and forth 9 over what that is. 10 So those would be the only 11 limitations. So that's the intention of the 12 recommendations, is not to have any 13 limitations. And I think our recommendations 14 make it very clear that the workforce in this 15 triparthied and their representatives, the 16 union, should be involved in the development 17 of the case as well as all the supporting 18 documents. 19 And including, which we think is 20 even more critical and which is identified by 21 the unions in the United Kingdom, Australia 22 and Norway is very critical, is participation

202-234-4433 Neal R. Gross and Co., Inc. Page 102 1 as elective representatives represented by the 2 Government which goes much further than 3 anything that exists currently in the United 4 States where they have the authority to 5 address hazards, conduct investigations. And 6 that authority is recognized by the regulator. 7 Also, we recommend in the report 8 the authority to stop unsafe work, and also we 9 recommend that that work cannot commence, 10 which is the case in a couple of the countries 11 that have the Safety Case, until the regulator 12 intervenes. So we did address it in the 13 recommendation statement. 14 MEMBER GRIFFON: Thank you, thank 15 you. 16 CHAIRPERSON MOURE-ERASO: Board 17 Member Rosenberg? 18 MEMBER ROSENBERG: Okay. You sort 19 of addressed it, but I'm going to harp on it, 20 because it is what I harp on. 21 I believe that the single most 22 important criterion for a safe workplace is

202-234-4433 Neal R. Gross and Co., Inc. Page 103 1 the voice of labor. And I would like to know 2 from you why you think that a Safety Case 3 regime will give workers more power in this 4 country than they have now, the fear of 5 retaliation will be less. 6 MR. HOLMSTROM: Sure. I think 7 some of us who, you know, participated in the 8 development of the concept of the Safety Case 9 on the staff level, worked in plants and are 10 very familiar with the world of worker 11 participation. 12 I think that what we hear from 13 unions such as the Steelworkers and others, is 14 that current regime has the word developing 15 procedures for participation. But it's not 16 real empowerment. And it doesn't provide 17 workers with the ability to actively affect 18 safety. 19 What we noted in this 20 investigation is that workers and union 21 representatives pointed out in previous 22 incidents that there were problems with

202-234-4433 Neal R. Gross and Co., Inc. Page 104 1 sulfidation corrosion, and those issues 2 weren't addressed. 3 Clearly, under the Safety Case, 4 elected worker representatives would have the 5 power not only to raise that to the company, 6 they would have a regulatory recognized power 7 to raise that to the regulator. 8 And they would also have the power 9 to shutdown on safe work until the regulator 10 intervened. That is a much greater power than 11 exists. 12 Currently, the power that exists 13 in the United States is largely a result of 14 the strength of the group within the plant as 15 well as the, you know, regulatory mechanisms 16 that exist and in collective bargaining 17 agreements. 18 And those are certainly important 19 mechanisms for worker participation. But we 20 think, and we certainly heard, and we had 21 extensive conversations with workers in 22 Norway, United Kingdom, Australia and other

202-234-4433 Neal R. Gross and Co., Inc. Page 105 1 countries, that these elected representatives 2 was the key element for them and the safety 3 committees. 4 They've also established broader 5 groups. Within the United Kingdom, for 6 example, there's an organization called Step 7 Change for Safety which is, it's a triparthied 8 group consisting of the regulator, affected 9 companies and the trade unions and worker 10 representatives, a bunch of worker 11 representatives. 12 They've produced a lot of 13 guidance. They have a number of training 14 sessions for worker representatives. And they 15 have also written guidance, I think, which we 16 have circulated internally that's under the 17 sponsorship of the HSE of how to improve 18 worker representation and worker empowerment. 19 I don't think we've seen anything 20 like that in the United States that's 21 comparable, where actual workers are writing 22 documents under the auspices of OSHA, or EPA

202-234-4433 Neal R. Gross and Co., Inc. Page 106 1 or any other regulatory agency where they're 2 actually making recommendations and conducting 3 advocacy on the behalf of workers. And 4 they've spoken very eloquently to us about how 5 critical that is and how it's stabilized. 6 MEMBER ROSENBERG: Thank you. 7 CHAIRPERSON MOURE-ERASO: Thank 8 you. I have one question also. I don't know 9 if it's a logical question, you know. I have 10 been aware watching, the two years worth of 11 this investigative group, this investigative 12 team at Chevron, the exhaustive effort to make 13 recommendations that the investigative team 14 feels are priorities based on the facts that 15 we're investigating. 16 They have been practice for 17 organization, the CSB, to make recommendations 18 based on investigated facts and findings. 19 Today, there has been a number of additional 20 recommendations that, very interesting 21 recommendations that have been presented by a 22 number of the elected officials at this point.

202-234-4433 Neal R. Gross and Co., Inc. Page 107 1 And they have been suggested today at this 2 meeting. 3 However, to my knowledge, they are 4 not based on the specific findings that we're 5 investigating in this report, since there is 6 still a third pending report in Chevron. 7 Do you think, I'm asking the team, 8 would it be possible to investigate those new 9 recommendations that are presented here as 10 something that we should consider that could 11 inform, I mean, that we can investigate our 12 findings that could inform the suggestions, 13 recommendations that we are here in this long 14 distance being discussed today? 15 MR. HOLMSTROM: Well, that's a 16 good question. In every investigation we try 17 to make a distinction between causal findings 18 due to what actually occurred and what we 19 might call audit findings and things that are 20 problems or issues in the investigation. 21 And we try to focus on those 22 things that are the most closely related to

202-234-4433 Neal R. Gross and Co., Inc. Page 108 1 causation. Certainly in the course of our 2 investigation, there are things that have been 3 presented to us that are issues that people 4 have raised. 5 As a group of investigators who 6 are scientifically minded, we try to steer 7 tightly to those things that we think have 8 some causal relation. And we have tools like 9 logic trees, and Aximaps and cause and effect 10 diagrams that help guide us in that area. 11 We certainly think that some of 12 the issues tonight that have been raised are 13 important. And in fact, some of them, as we 14 stated in our interim report, we plan to 15 address. 16 One of those was the issue of the 17 history of using clamps in the facility. We 18 stated in the interim report that we're 19 concerned that that's a safety culture issue. 20 It's also, obviously, a process safety issue. 21 And the investigation team, Dan 22 and his team, are taking steps and have been

202-234-4433 Neal R. Gross and Co., Inc. Page 109 1 taking steps to collect information on that. 2 And we have set up interviews for February to 3 find out information about that issue in terms 4 of clamps. 5 And just so you're aware, we're 6 looking, you know, putting a clamp on a piece 7 of piping or equipment typically represents 8 what we would believe is a process safety 9 failure, a mechanical integrity failure. 10 And so it should be analyzed. Why 11 did that happen, why did you have a release or 12 a leak or anything that wasn't detected and 13 fixed prior to being put on a clamp? And so 14 that's also a cultural issue. Why were there 15 so many clamps? 16 Well, they're looking not only at 17 the clamps that had a due date and weren't 18 replaced, which I think were the ones that 19 OSHA looked at, but the broader issue is a 20 larger number of clamps. And how does that 21 issue impact a reflection of safety cultures? 22 So that's certainly something

202-234-4433 Neal R. Gross and Co., Inc. Page 110 1 we're going to look at. And certainly, as 2 part of that, there'd be a question of the 3 existing clamps that, you know, what is their 4 status, not only from an abatement perspective 5 but also a process safety perspective. 6 What is the plan for removing the 7 clamps, fixing mechanical integrity issues, 8 and what is the history there? And how does 9 that relate to any potential recommendations, 10 either related to process safety culture or 11 other issues? 12 So certainly we're going to be 13 examining that issue as a broader cultural 14 issue. And how it connects to this incident 15 is, when the initial small leak occurred, the 16 first inclination of evidence we have was that 17 people were considering placing a clamp on the 18 leak. 19 So certainly, as a cultural issue, 20 that leak, consider a clamp. With a clamp you 21 remove insulation, and that's when the serious 22 release occurred. So I don't know if that --

202-234-4433 Neal R. Gross and Co., Inc. Page 111 1 CHAIRPERSON MOURE-ERASO: No, no. 2 Because this is just a question. I would like 3 to now go to the public comments phase of 4 this. I would like to ask our Managing 5 Director, Dr. Daniel Horowitz, to please try 6 to manage the public comments. 7 DR. HOROWITZ: Okay. That is a 8 difficult assignment, Mr. Chairman, but I'm 9 happy to do it. 10 A number of people have signed up. 11 Could we have a show of hands of people who 12 have not signed up but who are interested in 13 commenting as well? Just a handful, okay. 14 Well, why don't we forge right ahead. 15 And we can start with Alice 16 Busching Reynolds, Deputy Secretary for 17 California State EPA. Ms. Reynolds? 18 MS. REYNOLDS: Yes. 19 DR. HOROWITZ: Thank you. 20 MS. REYNOLDS: Good evening, Mr. 21 Chair and members of the Board. 22 DR. HOROWITZ: Do you mind, and

202-234-4433 Neal R. Gross and Co., Inc. Page 112 1 I'm going to ask this of all the commenters to 2 please spell out your name for the court 3 reporter, who is essentially transcribes this? 4 (Off microphone discussion) 5 MS. REYNOLDS: Good evening, Mr. 6 Chair and members of the Board. My name Alice 7 Reynolds. My last name is spelled R-E-Y-N-O- 8 L-D-S. I'm the Deputy Secretary for Law 9 Enforcement and Counsel at California 10 Environmental Protection Agency. I'm also a 11 member of a California interagency refinery 12 task force. 13 And first I wanted to thank you 14 for the opportunity to speak with you today. 15 Refinery safety is something that is obviously 16 very important to the state. 17 And the task force values the 18 careful attention that the CSB staff gave to 19 this investigation. And we have appreciated 20 the opportunity to collaborate with staff over 21 the past months. 22 In the aftermath of the August

202-234-4433 Neal R. Gross and Co., Inc. Page 113 1 6th, 2012, fire at the Chevron Refinery, like 2 CSB, California also took action. We convened 3 a working group on the primary safety led by 4 the Governor's office. 5 The working group included 6 participants from 13 agencies and departments. 7 It met over a period of nine months with 8 industry, labor, community, environmental, 9 academic, local emergency response and other 10 stakeholders. 11 And the group issued a draft 12 report entitled Improving Public and Worker 13 Safety at Oil Refineries in July of 2013. The 14 Governor's working group expects to release 15 the final report later this month. 16 The report states the findings of 17 the working group, and it also does more than 18 restate existing practices and problems. It 19 includes goals that are not out of reach and 20 not unrealistic. 21 There are real achievable ways to 22 improve public and worker safety through

202-234-4433 Neal R. Gross and Co., Inc. Page 114 1 enhanced refinery oversight and also to 2 strengthen emergency preparedness in 3 anticipation of any major incident. 4 The working group findings 5 reflected significant concerns about ongoing 6 refinery practices and prevention of major 7 accidents. 8 All of the investigations of this 9 incident have identified incomplete or 10 inadequate policies and procedures at the 11 Richmond Refinery and failure to evaluate pipe 12 safety problems during the process hazard 13 analysis and failure to act on internal 14 reports about hazards. 15 The working group identified four 16 main areas in need of improvement, a need for 17 improved coordination between agencies, 18 including improved data, and information 19 sharing and improved oversight of refineries. 20 The second area is to strengthen 21 emergency response and preparedness, including 22 needed improvements in hazardous material area

202-234-4433 Neal R. Gross and Co., Inc. Page 115 1 plans and air monitoring. 2 The third area is the need for 3 changes in safety prevention, including needed 4 improvements to the Cal/OSHA Process Safety 5 Management Program and the California 6 Accidental Release Prevention Programs for 7 risk management and program regulations as 8 well the need for greater resources from 9 enforcement of these regulations. 10 Fourth, the need for enhanced 11 community education and alerts, including 12 greater public and worker input into decision 13 making. 14 These findings led to a series of 15 recommendations. And to implement the 16 recommendations, an interagency refinery task 17 force was created at Cal/EPA. The first 18 meeting of the task force was held in August 19 2013 with two additional meetings this fall 20 and multiple meetings of work groups. 21 There are nine state agencies or 22 departments represented along with partners

202-234-4433 Neal R. Gross and Co., Inc. Page 116 1 from U.S. EPA, seven local unified program 2 agencies or (inaudible) and four air pollution 3 control districts. 4 The task force has formed two work 5 groups, one on emergency preparedness and 6 response and one on safety and prevention. 7 These work groups have created work plans, and 8 time lines and are working to revise existing 9 regulations and guidelines. 10 And we're also planning for public 11 meetings early this year in the Bay area of 12 Southern California and Kern County. 13 Additionally, while the working 14 group was completing its process, several 15 enforcement actions were also proceeding 16 following the July 2012 incident. 17 Approximately six months after the 18 incident, on January 30th, 2013, Cal/OSHA 19 issued 25 citations to Chevron, including 11 20 willful, serious citations and almost $1 21 million in civil penalties. 22 On August 5th, 2013, the

202-234-4433 Neal R. Gross and Co., Inc. Page 117 1 California Attorney General and the District 2 Attorney for Contra Costa filed a criminal 3 action and plea agreement against Chevron 4 stemming from the August 6th incident. 5 In response to the complaint, 6 Chevron agreed to pay $2 million in fines and 7 restitution and pleaded no contest to six 8 misdemeanor counts. The U.S. Environmental 9 Protection Agency also issued findings of 10 violation in December of 2013. 11 We look forward to continuing to 12 work with the Chemical Safety Board as well as 13 labor, business, environmental groups and the 14 community to do our utmost to assure that 15 California refineries take stronger action to 16 eliminate fires or releases that threaten 17 workers and communities. Thank you. 18 CHAIRPERSON MOURE-ERASO: Thank 19 you. 20 DR. HOROWITZ: Thank you, Ms. 21 Reynolds. Next is Dr. Gina Solomon, also of 22 Cal/EPA. And do, please, spell your name for

202-234-4433 Neal R. Gross and Co., Inc. Page 118 1 the court reporter. 2 DR. SOLOMON: Absolutely. Good 3 evening, Mr. Chairman, members of the Board. 4 My name is Gina Solomon. My last name is 5 spelled S-O-L-O-M-O-N. And I'm the Deputy 6 Secretary for Science and Health at the 7 California EPA. And I'm also one of the 8 members of the interagency refinery task 9 force. 10 And I wanted to talk a little bit 11 about what we are doing concretely right now 12 to try to fix our current system. I wanted to 13 also mention, I heard in the initial comments 14 there was this issue of where the burden for 15 safety lies in the different systems. 16 And I want to emphasize that the 17 burden for assuring safety, even in our 18 current system, lies on the industry, as 19 members of the Board well know. And, of 20 course, the burden for trying to assure that 21 that really happens is on the agencies. 22 And so we've identified a whole

202-234-4433 Neal R. Gross and Co., Inc. Page 119 1 series of things that we can implement now to 2 fix the standards that we have while we look 3 at other models that are out there. 4 And so the first steps that we're 5 taking closely follow recommendations made by 6 CSB in your interim report. So thank you very 7 much for that guidance. We're moving forward 8 with an effort to amend both the PSM and the 9 Cal/ALARP regulations to require the conduct 10 of root cause analysis following significant 11 incidents or releases. 12 And root cause analysis needs to 13 involve workers in the process and also be 14 made publicly available so that community 15 members can better understand the causes, the 16 root causes of incidents if they do occur. 17 But the other pieces are even more 18 focused on prevention, the issue of corrosion, 19 obviously central to the Richmond fire. The 20 Governor's working group identified the need 21 to require damaged mechanism hazard reviews as 22 a component of process safety.

202-234-4433 Neal R. Gross and Co., Inc. Page 120 1 So refineries would be required to 2 more systematically assess and address issues 3 like corrosion. And so we are moving forward 4 with that recommendation. 5 We also are looking at human 6 factors such as fatigue, for example -- not 7 metal fatigue but people fatigue, both are 8 important -- by requiring that management 9 change procedures, look at management 10 organizational change, staffing changes, 11 reorganization, operations, maintenance, 12 health and safety or emergency response. 13 And those issues will be 14 incorporated as we move forward with our regs. 15 In addition, we're incorporating some goal 16 based continuous improvement approaches that 17 really are very much consistent with those 18 that we see in Safety Case regimes. 19 So we're going to go ahead with a 20 proposal to put those into our existing 21 regulatory framework. One of these is 22 including a requirement for periodic safety

202-234-4433 Neal R. Gross and Co., Inc. Page 121 1 culture assessments. 2 So this involves both workers, so 3 bottom up, and also management, top down, 4 culture of safety within individual companies. 5 And there are tools that are out there to 6 measure that. So we think we can do this. 7 Additionally, we're working on 8 applying the concept of inherent safety as 9 recommended by CSB to refineries. It's 10 another distinctive component that's 11 consistent with the Safety Case. 12 We're looking at terms such as 13 ALARP, as most reasonably practicable, and 14 other terms in situations where we, you know, 15 in the PSM regulations. And then we're also 16 looking at, in situations where inherent 17 safety cannot be achieved for good reasons, 18 then we're looking at regulatory requirements 19 like the hierarchy controls or layer 20 protection analysis that will assure that 21 we're moving toward this culture of continuous 22 improvement which we agree is exactly where we

202-234-4433 Neal R. Gross and Co., Inc. Page 122 1 need to be going. 2 The Governor's report identified 3 the Safety Case regime along with some other 4 issues as topics for future investigation. 5 And we are committed to doing that future 6 investigation. 7 We are acting immediately to 8 incorporate some elements of the Safety Case 9 regime. But other pieces, the wholesale 10 adoption of the Safety Case, would require a 11 major shift in California law, obviously, and 12 would also require some extensive additional 13 resources for regulatory agencies that we're 14 also working on. And that's what my 15 colleague, Dr. Wilson, will be speaking about 16 as well. 17 And so we also are going to be 18 looking at whether the Safety Case can be 19 implemented in a transparent way with 20 appropriate worker involvement and appropriate 21 public access. 22 So as we undertake this

202-234-4433 Neal R. Gross and Co., Inc. Page 123 1 evaluation, we're very interested in 2 continuing to work with CSB, to continue to 3 consult with you as we share the common goal 4 of moving towards safer design, safer 5 technology and enhanced protection to prevent 6 incidents like this from happening again in 7 the future. 8 If we can possibly do anything 9 then we'll do that. So thank you very much 10 for your time this evening. 11 DR. HOROWITZ: Thank you, Dr. 12 Solomon. And next I think we'll have Dr. 13 Michael Wilson who is the chief scientist with 14 the Department of Industrial Relations. And 15 please do spell your name, even though it's 16 Wilson. 17 DR. WILSON: Thank you. It's Mike 18 Wilson, W-I-L-S-O-N. Chairman Moure-Eraso, 19 and members Rosenberg and Griffon and CSB 20 staff, on behalf of the California Department 21 of Industrial Relations and DIR Director 22 Christine Baker, thank you for your leadership

202-234-4433 Neal R. Gross and Co., Inc. Page 124 1 in responding to the challenge of ensuring the 2 safety and security of the Nation's process 3 industries. 4 And thank you for your work here 5 in California and your investigative work of 6 the Richmond Chevron pipe rupture and fire. 7 We would also like to extend our 8 appreciation for the support that you have 9 offered California by deploying CSB process 10 safety expert, Mr. Bill Hoyle, from 11 Washington, D.C. to California. I cannot 12 overstate how important Mr. Hoyle's expertise 13 has been to California and our efforts to 14 date. Thank you. 15 As you know, the Department of 16 Industrial Relations oversees state programs 17 that are charged with protecting the health 18 and safety of California's 18 million workers. 19 Worker health and safety is often, of course, 20 inextricably linked to that of the community. 21 DIR is home to Cal/OSHA where 22 California's process safety management unit

202-234-4433 Neal R. Gross and Co., Inc. Page 125 1 resides, overseen by state-wide district 2 manager, Clyde Trombettas. 3 The DIR office of the director 4 together with our Cal/OSHA PSM unit is 5 participating in the leadership of the 6 Governor's interagency refinery task force 7 which was convened by Governor Brown 8 immediately following the incident at Chevron. 9 And as you've heard from the 10 Deputy Secretaries Solomon and Reynolds, the 11 task force consists of 13 state and local 12 agencies and departments and has basically 13 been charged by Governor Brown with 14 evaluating, and where necessary making changes 15 to the state's regulatory structure to ensure 16 that what happened here does not happen again 17 in California. 18 We appreciate that the resources 19 of the Chemical Safety Board are limited. We 20 know that it represents a significant 21 commitment on the part of the Board to 22 undertaken an investigation such as you've

202-234-4433 Neal R. Gross and Co., Inc. Page 126 1 done here. That is, one that uncovers not 2 only what happened at Chevron technically but 3 why. 4 Understanding the why of an event 5 requires answering complicated questions about 6 a plant's safety culture, its systems of 7 values and priorities, its mechanisms for 8 meaningful worker participation and for 9 transparency and accountability with the 10 community. 11 It requires understanding how a 12 plant decides when, and where and how much to 13 invest in maintenance and safety. The answers 14 to these questions are extraordinarily 15 valuable, because they are the factors that 16 dictate the path that an industrial facility 17 will follow. 18 That path can lead ultimately to a 19 catastrophic incident as we've seen here and 20 it can lead to the highest possible level of 21 attention to protecting worker, community and 22 environmental health.

202-234-4433 Neal R. Gross and Co., Inc. Page 127 1 I can assure you that the efforts 2 of your team, led by Dan Tillema and Don 3 Holmstrom, that you've taken to answer these 4 kinds of questions and bring light to the 5 underlying drivers of the Chevron fire are of 6 great value to our work here in the State of 7 California. 8 In responding to the Chevron 9 incident in our work with the Governor's task 10 force, the Department of Industrial Relations 11 has focused on three priorities. And I'll 12 mention each of those just briefly in the 13 context of your recent report. 14 Our first priority following the 15 incident was to take immediate action to 16 investigate potentially eminent worker and 17 community health and safety hazards at the 18 Chevron facility and throughout the California 19 refinery sector. 20 In early 2013, our Cal/OSHA PSM 21 unit, under Mr. Trombettas' direction, 22 inspected 2,000 pipe clamps in use at the

202-234-4433 Neal R. Gross and Co., Inc. Page 128 1 Chevron facility, launched a statewide 2 leak/seal special emphasis program targeting 3 the state's refineries and conducted 3,600 4 hours of inspections at nine refineries 5 statewide. 6 This year, we're defending our 25 7 citations at Chevron and about a million 8 dollars in civil penalties. And we're 9 enforcing the terms of Chevron's three year 10 probation pursuant to Contra Costa County's 11 criminal misdemeanor settlement. 12 This includes reviewing corrosion 13 reports for about 300 piping systems at 14 Chevron with our partners at Contra Costa 15 Health Services and U.S. EPA. We'll be 16 conducting ultrasonic verification testing on 17 a subset of piping to confirm the veracity of 18 these reports. 19 Our second priority is that we're 20 talking steps to increase funding to our PSM 21 unit. We recognize that overseeing process 22 safety requires resources.

202-234-4433 Neal R. Gross and Co., Inc. Page 129 1 Facilities that handle large 2 quantities of hazardous materials, often under 3 high temperature and pressure, employ hundreds 4 and sometimes thousands of workers. They're 5 often situated in close proximity to populated 6 areas and they're extraordinarily complex, 7 both technically and organizationally. 8 Major incidents are relatively 9 infrequent. But when they do occur, we have 10 seen time and again they have major 11 consequences for worker and community health 12 and safety. As your report describes, these 13 facilities therefore require special 14 regulatory oversight. 15 California is unique among U.S. 16 states in that we've developed our own process 17 safety management standard and have committed 18 resources in our PSM unit implementing that 19 standard. 20 California is the only state and 21 the only OSHA program nationally with a 22 dedicated PSM unit whose technical staff focus

202-234-4433 Neal R. Gross and Co., Inc. Page 130 1 exclusively on process safety. We're proud of 2 that fact, and we also acknowledge the immense 3 challenges our PSM staff are up against. 4 In answer to these challenges, the 5 California State Legislature directed Cal/OSHA 6 to adopt a means of assessing annual fees from 7 refineries to support regulatory oversight. 8 Governor Brown included authority in his 2013 9 state budget for Cal/OSHA to assess these fees 10 each year based on an individual refinery's 11 crude oil input as a proportion of the state's 12 goal of production. 13 We finalized emergency regulations 14 to take this action last year, and we are now 15 using these fees to increase the operational 16 capacity of our PSM unit. This steady source 17 of funding, supported by the industry itself, 18 is critical to efforts to modernize process 19 safety in California. And we believe the same 20 could be said for the U.S. as a whole. 21 Funding is our third priority. 22 We recognize that the state's

202-234-4433 Neal R. Gross and Co., Inc. Page 131 1 process safety regulations are in need of 2 modernization. As you've made abundantly 3 clear, the process safety management standard 4 is over 20 years old and much has changed in 5 our understanding of process safety. 6 We're seeking to do two thing in 7 our revisions, and you've heard earlier from 8 Dr. Solomon. One is provide a framework 9 within which the industry will continually 10 improve its safety performance. 11 Second is to provide our PSM 12 technical staff with the best possible tools 13 and information they need to do their job in 14 protecting worker and community health and 15 safety. 16 As we've found, many of the PSM 17 improvements we're contemplating have already 18 been put in place by leading companies in the 19 refinery sector. 20 And many of them have been 21 informed by improvements in the Federal PSM 22 standard that are under consideration by

202-234-4433 Neal R. Gross and Co., Inc. Page 132 1 Federal OSHA as part of President Obama's 2 Executive Order 13650 on improving chemical 3 facility safety and security written in the 4 wake of the West Texas disaster. We look 5 forward to working with the Obama 6 Administration in support of the Executive 7 Order. 8 As we work on regulatory changes, 9 we appreciate the Board's calling attention to 10 the Safety Case approach which has been 11 implemented by refineries operating in the 12 U.K., Australia and Norway. 13 Through the task force we are 14 establishing a work group to collect and 15 review data on the Safety Case regime and its 16 potential applications in California. 17 And in the interim, as Board 18 members Rosenberg and Griffon have noted, 19 we're evaluating the ways in which our changes 20 to the PSM standard can incorporate key 21 elements of a Safety Case approach today. 22 In closing, I'll say that our

202-234-4433 Neal R. Gross and Co., Inc. Page 133 1 objective here in California is to craft a 2 modern regulatory framework, a national model, 3 within which the state's refineries will 4 prioritize and continually improve their 5 safety, health and environmental performance 6 consistent with the highest industry standards 7 worldwide. 8 That concludes my remarks. And 9 once again, thank you for your 10 professionalism, and for your good work and 11 for you attention this evening. 12 CHAIRPERSON MOURE-ERASO: Thank 13 you. 14 DR. HOROWITZ: Thank you. And 15 next I think we'll have Randy Sawyer, the 16 Director of the Contra Costa Hazardous 17 Materials unit. We heard you were unwell, so 18 happy to see the Safety Case has restored you 19 to health. 20 (Laughter) 21 MR. SAWYER: I should hope so. 22 But bear with me. My voice may go away for a

202-234-4433 Neal R. Gross and Co., Inc. Page 134 1 moment. Good evening. My name's Randy 2 Sawyer, S-A-W-Y-E-R. And thank you, Chairman 3 Moure-Eraso and members of the Board for 4 allowing me to speak this evening. 5 My job is the chief environmental 6 health and hazardous materials officer for 7 Contra Costa County. Contra Costa County is 8 home for four petroleum refineries and several 9 medium to small chemical facilities. Contra 10 Costa hazardous materials staff implements the 11 City of Richmond and the County's Industrial 12 Safety Ordinances. 13 These ordinances go beyond the 14 requirements of the California XRE's 15 prevention program, OSHA, Cal/OSHA's process 16 safety management and U.S. (inaudible) 17 management. 18 The ordinance requires a regular 19 facilities review from the (inaudible) system, 20 expanse on human factors. It requires root 21 cause analysis as part of an incident 22 investigation. It requires facilities to

202-234-4433 Neal R. Gross and Co., Inc. Page 135 1 perform a safety culture assessment. And all 2 the processes and processed unit within the 3 refinery are subject to the ordinance. 4 The county adopted the ordinance 5 in January of 1999, and the City of Richmond 6 adopted the ordinance in January 2002. During 7 the 1990s there wasn't any average of a high 8 severity accident annually in Contra Costa 9 County. Since the ordinance was adopted by 10 the county, there's been only one high 11 severity accident, the August 6th, 2012, 12 Chevron fire. 13 There have been other less severe 14 accidents, but there has been general decline 15 in these accidents since 1999. I believe that 16 you can compare the success in industrial 17 safety favorably to the Safety Case being 18 implemented by the United Kingdom's health and 19 safety executive. 20 Even with this success, the August 21 6th, 2012, fire occurred. The Chemical Safety 22 Board, in their interim report on the

202-234-4433 Neal R. Gross and Co., Inc. Page 136 1 investigation of the fire, made a number of 2 recommendations to improve the Industrial 3 Safety Ordinance. 4 The City of Richmond and the 5 county staff have been working together and 6 making the necessary changes to address the 7 recommendations. 8 The Chemical Safety Board has been 9 willing to review drafts of these changes to 10 make sure that we are addressing their 11 findings and recommendations. I think these 12 changes will make the requirements of the 13 ordinance stronger. 14 I also remember the State's 15 refinery safety task force in which you've 16 heard more details from earlier speakers this 17 evening. 18 I thank the Board and their staff 19 for raising the question is there a better way 20 to prevent accidents such as the August 6th, 21 2012, fire and proposing a possible solution 22 to this question.

202-234-4433 Neal R. Gross and Co., Inc. Page 137 1 I believe that this question needs 2 to be addressed. I believe that all accidents 3 are preventable. I also believe that the 4 actions being taken by the city, county and 5 state, when implemented, will improve the 6 existing programs of the prevention of 7 refinery accidents. 8 Is this enough to do? Where 9 additional changes need to be made, such as 10 the implementation of the Safety Case regime, 11 will need to be determined. 12 It is my belief that, no matter 13 what the regulatory requirements are, 14 ultimately it comes down to the safety culture 15 within the facility and how successful the 16 facility will be in preventing such accidents. 17 If the facility has a good safety 18 culture, it will not matter. The regulatory 19 requirements of the facility would do, the 20 facility would then do whatever it's required 21 to do ending such accidents. I thank you this 22 evening for allowing my comments.

202-234-4433 Neal R. Gross and Co., Inc. Page 138 1 CHAIRPERSON MOURE-ERASO: Thank 2 you, Randy, appreciate it. 3 DR. HOROWITZ: Thank you. Next is 4 Ann Werboff, of the United Steelworkers. Ms. 5 Werboff, are you here? 6 (Pause) 7 MS. WERBOFF: Hi, my name is Ann 8 Werboff. That's spelled W-E-R-B-O-F-F. And 9 I represent the United Steelworkers Local 675. 10 Our union has 5,000 members in 11 Southern California and Nevada. Our members 12 work at the five refineries in the Greater Los 13 Angeles area, including the Chevron El Segundo 14 Refinery. 15 We are here today because what 16 happened at the Chevron Richmond Refinery 17 could just as easily have happened in the El 18 Segundo Refinery. 19 We believe that corrosion is 20 widespread in the industry, as evidenced by 21 the large number of temporary piping repairs 22 that are not permanently repaired for years.

202-234-4433 Neal R. Gross and Co., Inc. Page 139 1 Further, the industry's own 2 insurers acknowledge an accident rate that is 3 three times higher for U.S. refineries than 4 those cited in other countries. Clearly, our 5 current accident prevention programs here in 6 the U.S. are not as effective as they are 7 elsewhere. 8 The key findings in the Richmond 9 incident, that the pipe ruptured due to 10 sulfidation corrosion and that Chevron 11 management was aware of this corrosive pipe, 12 were also found to be true for the El Segundo 13 Refinery. 14 The El Segundo Refinery is located 15 at one end of a downtown business district and 16 is within six blocks of the town's elementary 17 and high schools. If this incident had 18 occurred there, the impact on the workers and 19 the local communities in El Segundo and the 20 neighboring city of Manhattan Beach would have 21 been very similar to that of Richmond. And 22 that is the reason we are here today, that I

202-234-4433 Neal R. Gross and Co., Inc. Page 140 1 came up from Los Angeles. 2 So the CSB has recommended the 3 Safety Case approach to reduce risks. And we 4 feel there are three components that need to 5 be included to be effective which have been 6 raised here today. And we want to support 7 them. 8 One is the active funding and 9 resources including personnel for regulatory 10 agencies. As a Safety Case system involves 11 Government inspection teams to ensure industry 12 compliance, sufficient resources must be 13 provided. And one potential source of 14 revenues could be these uncovered employers. 15 The second is the triparthied 16 approach, you know, in which workers and their 17 representatives are on equal footing with 18 industry and regulators. 19 Workers have intimate knowledge of 20 the plant in which they work and are the first 21 ones to respond to and be potentially hurt by 22 incidents or near misses. So a new regulatory

202-234-4433 Neal R. Gross and Co., Inc. Page 141 1 framework must ensure a meaningful role for 2 workers. 3 And thirdly, for the question of 4 accountability of industry, because again, it 5 is industry, not regulators, who are 6 responsible for safe workplaces. A properly 7 regulated Safety Case approach would put the 8 burden for safe workplaces where it belongs, 9 on the owners and the managers of the work 10 sites. 11 And we want to thank you for 12 letting us provide comments this evening. 13 CHAIRPERSON MOURE-ERASO: Thank 14 you very much. 15 (Applause) 16 DR. HOROWITZ: Thank you. Next is 17 Ron Chittim of the American Petroleum 18 Institute. Mr. Chittim? 19 MR. CHITTIM: Good evening, my 20 name is Ron Chittim, C-H-I-T-T-I-M. And I'm 21 a senior policy advisor with American 22 Petroleum Institute. API appreciates the

202-234-4433 Neal R. Gross and Co., Inc. Page 142 1 opportunity to be here tonight to provide 2 comments on the CSB draft regulatory report. 3 The API represents more than 550 4 companies involving all aspects of the oil and 5 natural gas industry. API members are 6 significantly affected by the efforts of the 7 CSB and are regularly called upon to respond 8 to and implement CSB's recommendations. 9 While API applauds CSB's continued 10 efforts to fulfill its core mission by 11 conducting investigations of accidental 12 releases and timely sharing of its findings, 13 API has a number of concerns about the CSB 14 recommendation to California related to the 15 establishment of the Safety Case approach. 16 The API believes the current OSHA 17 process safety management regulations are 18 effective and that an overhaul in PSM standard 19 is unwarranted. 20 The PSM standard is a consistent 21 and well understood framework that has been 22 used by manufacturing facilities for over 20

202-234-4433 Neal R. Gross and Co., Inc. Page 143 1 years. Changing to Safety Case would add 2 complexity and uncertainly with no 3 demonstrated benefit. 4 Even now, Federal OSHA is working 5 to enhance and improve the existing PSM 6 standard. OSHA is requesting information from 7 stakeholders regarding potential revisions to 8 the PSM standard. These efforts to improve 9 the PSM standard should be explored before the 10 introduction of an entirely new and different 11 regulatory approach. 12 To the extent CSB sees areas for 13 improvement, API encourages CSB to continue 14 its focus on enhancements to the current PSM 15 standard. 16 One avenue to identify potential 17 improvements for the PSM program effectiveness 18 is for CSB to look at the NSTB/FAA model for 19 lessons learned that can be applied to CSB's 20 interactions with other Government agencies. 21 Concerning criticisms that the 22 current PSM standard lacks adaptability and is

202-234-4433 Neal R. Gross and Co., Inc. Page 144 1 slow to respond to needed safety changes, we 2 must note that, unlike other countries, such 3 as Norway or the U.K., in the U.S. new 4 regulations and regulatory revisions must go 5 thorough notice and comment rule making which 6 just takes time. 7 Of particular concern to API is 8 the lack of meaningful data that demonstrates 9 that the Safety Case approach produces better 10 safety performance than the PSM standard. 11 In fact, CSB acknowledges that 12 there have been few objective studies 13 conducted on the impact of the Safety Case 14 regulatory approach on safety performance, 15 onshore and offshore. 16 The CSB draft report also 17 recognizes that the existing data mainly 18 relates to offshore operations which increases 19 API's concern about applying Safety Case to 20 refineries. 21 If Safety Case or other regulatory 22 regimes are to be considered, all the relevant

202-234-4433 Neal R. Gross and Co., Inc. Page 145 1 U.S. regulatory bodies should first collect 2 meaningful data that can be used to justify 3 further consideration of regulatory 4 alternatives. 5 A major difference that we should 6 note in the two regulatory programs is the 7 role of the regulator. For OSHA, the 8 regulator performs more of an enforcement type 9 role, whereas in the Safety Case approach, the 10 regulator performs more of an acceptance or 11 permissioning role where a site's case is 12 accepted by the regulator. 13 The Safety Case approach would 14 require a significant increase in the number 15 of technically competent, well-resourced 16 regulators to review the hazards identified in 17 the site's case and to evaluate the 18 effectiveness of the controls used to manage 19 the risks. 20 This difference in the roles would 21 be costly, very difficult to implement, 22 without a clear and corresponding benefit.

202-234-4433 Neal R. Gross and Co., Inc. Page 146 1 But in either case, as has been stated several 2 times today, it is the site operator that 3 ultimately determines how to ensure safe 4 operations. 5 So in conclusion, as CSB correctly 6 notes, Safety Case is not perfect and no 7 regulatory system will be perfect in its 8 implementation. 9 In light of this acknowledgment, 10 API thinks the CSB should focus its limited 11 resources on incident investigations and 12 reports rather than expending resources 13 advocating for new regulatory programs. 14 API thinks the current PSM program 15 is effective but can be made better and that 16 the OSHA request for information needs to be 17 carried out and the results analyzed which may 18 lead to improvements in the PSM standard. 19 Additionally, API thinks there's 20 lack of data at this point to support the 21 adoption of a Safety Case in the U.S. Safety 22 is a continuous improvement journey. And we

202-234-4433 Neal R. Gross and Co., Inc. Page 147 1 acknowledge more can be done to improve safety 2 under the current PSM system. 3 The effectiveness of any safety 4 program is only as good as the commitment made 5 in its preparation, its implementation and its 6 execution. And the site operator is 7 ultimately responsible to ensure safe 8 operations. Thank you for your attention. 9 (Applause) 10 DR. HOROWITZ: Thank you, Mr. 11 Chittim. And I do want to remind our 12 listening audience, watching audience on KCRT 13 that you're welcome to submit your comments by 14 email as well. And you can send those to 15 csbmeeting@csb.gov or to public@csb.gov. And 16 we'll be happy to read those comments or 17 summarize them and provide them into the 18 record. 19 And we did receive one online 20 comment from Mr. Rick Hind, the Legislative 21 Director of Greenpeace in Washington, D.C. 22 And he writes, "Thank you for holding this

202-234-4433 Neal R. Gross and Co., Inc. Page 148 1 meeting." 2 And he, to get right to his 3 question, says that in the CSB's draft report 4 you recommended that California implement new 5 chemical facility rules to prevent these 6 disasters by requiring them to use the safest 7 chemical processes available. 8 The EPA has the authority under 9 the Clean Air Act, Bhopal Amendment, 112R I 10 believe he means, to require safer chemical 11 processes at plants like Chevron, nationwide. 12 And he notes that EPA is currently considering 13 rule making in this area. 14 And he asks, "Will you also 15 recommend that the EPA implement new chemical 16 facility rules to prevent future disasters by 17 requiring them to use the safest chemical 18 processes available as you recommended for 19 California?" 20 And I wonder if I could ask the 21 team, because it's an important question, how 22 does the Safety Case system handle the issue

202-234-4433 Neal R. Gross and Co., Inc. Page 149 1 of inherently safer technologies? And perhaps 2 how is it handled in the United Kingdom, for 3 example? 4 MR. HOLMSTROM: Yes, the CSB has 5 actually distributed to a number of people the 6 assessment guidelines that are used by 7 inspectors for onshore facilities within the 8 United Kingdom. 9 And inherent safety is one of the 10 basis of assessments for the Safety Case in 11 the United Kingdom for high hazard facilities. 12 In fact, in the United Kingdom, if you look at 13 the specific guidelines they actually look at 14 the design stage which is currently not under 15 the purview across the safety management 16 standard or through the existing plan. 17 So they engage in conversations 18 about inherent safety when the plant is being 19 designed which I think most people would 20 recognize is the most effective time period to 21 implement inherent safety before the plant is 22 designed and built.

202-234-4433 Neal R. Gross and Co., Inc. Page 150 1 And they've looked at inherent 2 safety throughout the life cycle of the plant 3 including not only just inherent safety but a 4 hierarchy of control. Inherent safety in the 5 hierarchy of controls is the most preferred 6 control mechanism. Because at its strongest, 7 it substitutes or eliminates the hazard. 8 But there are a number of other 9 controls that are effective for controlling 10 hazards that are much more respected, for 11 example, engineering or design rather than 12 relying on administrative controls, such as 13 following a procedure or responding to an 14 alarm which the CSB has noted, in many 15 investigations. 16 (Inaudible) control when things 17 have failed that operator accident or 18 responding to alarms is often identified in 19 PHAs as a control measure. For example, that 20 was true in the BP Texas City case in the high 21 level that occurred in the blowdown drum that 22 controls air.

202-234-4433 Neal R. Gross and Co., Inc. Page 151 1 The safeguards were listed as 2 operator action and alarms which are the 3 lowest and the least effective controls. And 4 there's nothing in the current process safety 5 management standard that would require 6 strengthening those particular safeguards. 7 So we identified, on the other 8 hand, on the Safety Case, that they actually, 9 as part and parcel of how they accept their 10 cases, we find inherent safety to be a key 11 element. 12 DR. HOROWITZ: Okay, thank you. 13 And those of you who are watching on TV, 14 csbmeeting@csb.gov. Let's go back to our 15 audience here in the room. 16 And next is, I apologize in the 17 pronunciation, Lipo Kentasa (phonetic), 18 representing the Asian Pacific Environmental 19 Network. 20 MR. KENTASA (phonetic): It's Lipo 21 Kentasa and -- 22 DR. HOROWITZ: Okay.

202-234-4433 Neal R. Gross and Co., Inc. Page 152 1 MR. KENTASA: (Inaudible). 2 DR. HOROWITZ: Okay, thank you. 3 Please go ahead, sir. 4 MR. KENTASA: Hello, all the 5 Board. I'm Camo (phonetic) and also the 6 resident of Richmond. And my name is Lipo 7 Kentasa. And I'm a member of APEN. 8 I don't have anything to add 9 except just wanted to thank you for the Board 10 and the staff who do the investigation. And 11 we support your recommendation all the way. 12 And this is something for us who 13 are resident here want to hear for many, many 14 year, long time ago. We want to see this 15 recommendation be. Not only want to see the 16 recommendation, we want to see the 17 implementation right now as what we want to 18 see. And we want to thank you. 19 CHAIRPERSON MOURE-ERASO: Thank 20 you. 21 (Applause) 22 DR. HOROWITZ: And next is Dr.

202-234-4433 Neal R. Gross and Co., Inc. Page 153 1 Henry Clark of the West County Toxics 2 Coalition. Nice to see you again, Dr. Clark. 3 DR. CLARK: Good evening, members 4 of the U.S. Chemical Safety Board. Welcome 5 to Richmond. 6 West County Toxics Coalition is 7 one of the oldest environmental justice 8 organizations in the country. We've been 9 around for about 30 years. We've worked with 10 communities not only here in Richmond but 11 throughout the United States as well as our 12 community in West Texas, okay. 13 First of all I want to say, in 14 regard to this Safety Case model that you 15 have presented to us, it sounds pretty 16 decent. I will say that , most of the 17 provisions. 18 I am concerned about the trade 19 secret part of it, you know. This community 20 here, especially in the environmental justice 21 groups here that have been dealing with 22 Chevron over the years, you know, we've

202-234-4433 Neal R. Gross and Co., Inc. Page 154 1 always had a problem with the refinery or 2 regulatory agencies, how a trade secret that 3 denied relevant information to us to make 4 some determination as to the impacts of 5 refinery expenses on our community. 6 So I don't see why we would choose 7 to accept a trade secret aspect of this 8 proposal. And we've always rejected it 9 before. So I'm not convinced on that part. 10 The other issue of concern is this 11 committee that you referred to with the 12 workers and other people on it. And you've 13 been focusing on the labor aspect of it, that 14 labor may not have adequate resources to have 15 a technical person there to evaluate this 16 case. 17 Well, you know, as far as I'm 18 concerned, the company should provide the 19 resources for labor and anybody else that's 20 part of that committee to have the 21 appropriate technical people there to be able 22 to assess that proposal. Otherwise, it's

202-234-4433 Neal R. Gross and Co., Inc. Page 155 1 nonsense, okay. 2 And you referred to a regulator. 3 I don't quite understand what you mean in 4 that regard. We have a lot of regulatory 5 agencies that do inspections there at 6 Chevron. 7 You have the Bay Area Air Quality 8 Management District. From what I understand, 9 it has a permanent inspector there at the 10 refinery on a daily basis. You have Mr. 11 Randy Sawyer from the county that's doing 12 some inspections there. 13 Plus EPA, from what I understand, 14 does a, I believe it may be every five years, 15 but like an overhaul, overall inspection of 16 refineries. And so when you refer to the 17 regulator having some authority to do 18 something, what do you mean? Are you meaning 19 that all of those regulatory agencies 20 individually or collectively are in some way, 21 what are you actually talking about? 22 You know, and in terms of the

202-234-4433 Neal R. Gross and Co., Inc. Page 156 1 enforcement part of it over there, Council 2 member Jim Rogers indicated enforcement is 3 really important in this whole process. 4 Because we've seen this here a revolving door 5 syndrome of regulators working for some 6 regulatory agency today, and then tomorrow 7 they're working for Chevron or some other 8 company. 9 And we don't want that type of 10 nonsense to continue to occur. We want some 11 real enforcement. And I'm concerned, you 12 know, the bottom line is that the buck stops 13 with the local people, our decision makers 14 that issue permits to Chevron and other 15 companies to operate. 16 They definitely need to be in the 17 process and decisions need to have the 18 necessary resources to do whatever necessary 19 evaluations that needs to be done to protect 20 the public health and safety of residents in 21 this city. 22 Now, the other point is this here,

202-234-4433 Neal R. Gross and Co., Inc. Page 157 1 you know. We're talking about trying to do 2 some things to protect public health and 3 safety through this here Safety Case model. 4 But there's the other point here 5 that I think we're sort of overlooking. Even 6 on a daily basis, even say Chevron or any 7 other company came up with a plan, you know, 8 with this committee and all of that. You 9 know, this deal really doesn't get to the 10 overall problem. Because there's such a 11 thing as environmental justice, okay. 12 And under former President 13 Clinton's Executive Order 12898 on 14 environmental justice which the City of 15 Richmond has also adopted a similar 16 environmental justice order, as well as the 17 State of California. And most environmental 18 justice laws are based on President Clinton's 19 Executive Order which basically says that no 20 community or people should be 21 disproportionately impacted by environmental 22 policies, okay.

202-234-4433 Neal R. Gross and Co., Inc. Page 158 1 Well, the fact is that communities 2 here like North Richmond where I come from 3 and others here already are. We're already 4 disproportionately impacted. So in terms of 5 when Chevron got a big major modernization 6 project coming up, like right now the draft 7 environmental impact report's supposed to be 8 out, I believe, next month. And the city and 9 Chevron is expecting the project to hopefully 10 be approved by July. 11 Yet we're talking about, even if 12 this here safety model is adopted, you know, 13 years before it's implemented. So what does 14 that do for this major expansion or 15 modernization that is happening right now at 16 Chevron in our community, you know? 17 That in spite of the fact that all 18 of these environmental justice laws that are 19 on the books say that we should not be 20 disproportionately impacted, yet, you know, 21 they're trying to come around the corner 22 through the back door and still increase the

202-234-4433 Neal R. Gross and Co., Inc. Page 159 1 disproportionate impact by some cap and trade 2 pollution trading scheme which would allow 3 them to increase greenhouse gas emissions and 4 associated toxins that would create a hot 5 spot, in spite of the fact that the City of 6 Richmond here has adopted the precautionary 7 principle and this environmental justice 8 argument. 9 So that's just being nipped in the 10 bud. That's why the local power here in our 11 City Council should enforce the regulations 12 and the laws that they have adopted. 13 And if you're for environmental 14 justice and the arguments that you have 15 adopted, then you should draw the line, 16 period, and not allow the ongoing 17 disproportionate impact on communities of 18 color here in the city, like my community in 19 North Richmond, period. 20 Otherwise, we just still up here 21 talking and playing games and, you know, 22 putting on the dog and pony show for the

202-234-4433 Neal R. Gross and Co., Inc. Page 160 1 cameras. And our people in our community 2 continue to suffer and die from asthma and 3 cancer. 4 So we want to see some real 5 action. I wanted to see, you know, this 6 precautionary principle enforced here in 7 Richmond, the environmental justice laws on 8 the book enforced here in Richmond and stop 9 the ongoing pollution of our community, and 10 our people and putting us at risk. 11 The other point that was mentioned 12 is about these listening sessions that's 13 going on around the country here under the 14 Executive Order 13650 that President Obama 15 just signed after the West Texas disaster 16 here, you know. 17 So here again, that's all 18 irrelevant to the refinery and other chemical 19 companies here in our community. And so here 20 again, we're going to be waiting for years 21 before those recommendations are looked at 22 and put into practice.

202-234-4433 Neal R. Gross and Co., Inc. Page 161 1 Also that here again, leaves us 2 vulnerable and which, in my opinion, is where 3 the city council should step in and enforce 4 their laws on the environmental justice. 5 One other point on the enforcement 6 for the other document, again, we'll mention 7 that the district attorney has enforcement 8 authority here in Contra Costa County which 9 the District Attorney is an elected official 10 and has been doing little or nothing to hold 11 Chevron or companies accountable. 12 The July 26th, 1993, sulphuric 13 acid disaster at General Chemical Company has 14 sent over 20,000 people to local hospitals. 15 Now, the DA and the county was on the hot 16 seat after that. They were threatening to 17 file criminal charges against General 18 Chemical Company. 19 But the company paid a $5.5 20 million fine rather than face criminal 21 charges. And money went to build the Center 22 for Health in the North Richmond community.

202-234-4433 Neal R. Gross and Co., Inc. Page 162 1 I noticed that none of these 2 hearings or anything, the DA or any 3 representative is here, you know. And the 4 community and the city, we need to put the DA 5 also on the hot seat to enforce these 6 criminal charges. 7 These people, you have all these 8 residents already at the refinery. You mean 9 to say that they didn't know that Chevron had 10 all these patched up pipes and that was, you 11 know, corroded. But, you know, they had the 12 authority to do something then. But they 13 didn't do nothing, period. 14 The bottom line is, is this here. 15 Far as the West County's Toxins Coalition is 16 concerned, we want protection of our 17 community. We ain't playing no softball, 18 we're playing hardball. We're not going to 19 accept no more disproportionate impact, 20 putting our community and our people at risk, 21 period. 22 If you and the city and these

202-234-4433 Neal R. Gross and Co., Inc. Page 163 1 other regulations don't do the job, we'll do 2 the job. Because as we said, you know, ain't 3 no power like the power of the people. 4 Because the power of the people don't stop, 5 period. And we're going to stop this 6 nonsense. 7 (Applause) 8 DR. HOROWITZ: Thank you, Dr. 9 Clark. Next Greg Karras, Communities for 10 Better Environment. 11 MR. KARRAS: Thank you, good 12 evening. I'm Greg Karras, K-A-R-R-A-S, 13 senior scientist with Communities for a 14 Better Environment, CBE. 15 I want to thank you for your 16 continued service to our community tonight 17 and suggest an answer to perhaps the most 18 divisive argument the industry has raised 19 against your reports, proposed 20 recommendations. 21 Before I do that, just to be 22 clear, CBE has joined with the Refinery

202-234-4433 Neal R. Gross and Co., Inc. Page 164 1 Action Collaborative in supporting the report 2 and the recommendations in writing. We still 3 support that and urge your adoption tonight. 4 We see the strengthening 5 recommended amendments, probably most 6 specifically laid out by Congressman Miller 7 and Supervisor Gioia as being consistent 8 with, further to and maybe even prerequisite 9 for fully implementing the Safety Case that 10 we don't see. 11 And we understand the 12 recommendation to be an advisory one that the 13 State of California, Dr. Wilson and his 14 colleagues, would be charged with actually 15 fleshing out and developing with hopefully 16 full participation of the public, community 17 and the workers. 18 So on that basis, we do, Richard, 19 still feel that it's appropriate to adopt 20 tonight with those amendments and with the 21 either/or if you want. 22 We also really appreciate, I

202-234-4433 Neal R. Gross and Co., Inc. Page 165 1 really appreciate the emphasis on the root of 2 the problem being an imbalance of power. Oil 3 corporations get to decide to cut corners. 4 Workers and communities who live there, where 5 the bankers around the companies don't live, 6 bear the brunt of it. That's what we need to 7 fix. 8 And in that spirit, I would say 9 that the solution is very closely tied to the 10 most divisive argument that, to sort of quote 11 the way your staff put it on Page 104, 12 "There's no will in the U.S. to ensure that 13 regulators have the tools, resources and 14 competence to effectively regulate." 15 So I want to suggest that that's 16 at the nub of some of the friendly debate 17 we're having tonight and that there's an 18 answer to that I'd like to suggest. 19 Where I come from, your father 20 might come home dirty and shaking late one 21 night and try to explain to his kids about 22 the explosion at the plant that killed his

202-234-4433 Neal R. Gross and Co., Inc. Page 166 1 co-workers that day. 2 First time that happened to me I 3 was about six years old. The workers are a 4 part of the community, right. And before 5 Chevron's higher sulphur crude slate 6 accelerated the corrosion that burst the pipe 7 that led to the disaster last August, CBE 8 warned public officials about the higher 9 sulphur crude increasing incident risk. So 10 did workers. We're part of the same 11 community. 12 Now, and you've heard some about 13 this from other speakers, so I'll be brief, 14 Chevron proposes a project that could further 15 increase the sulphur content of the crude, 16 the corrosiveness of the crude. 17 At the same, it's fighting to get 18 a delay in fixing the corrosion clamps that 19 are widespread problems and safety violations 20 throughout the refinery. 21 CBE is following up on the court 22 orders that we've won demanding that Chevron

202-234-4433 Neal R. Gross and Co., Inc. Page 167 1 be transparent and that there be a full 2 review of the implications of that project. 3 That's our role. 4 The workers in the workers union, 5 meanwhile, have joined into that appeal on 6 the side of OSHA fighting Chevron in this 7 case to try to make sure those clamps get 8 replaced in that safety hazard. 9 Again, we sometimes have slightly 10 different roles. We sometimes have friendly 11 differences of opinion. Workers are part of 12 the community. We're in this together. 13 And statewide, the combination of 14 aging infrastructure that we agreed is a big 15 part of it, and the shift to even more 16 corrosive crude, is a ticking time bomb. 17 This is an urgent situation. 18 Communities are grappling with it in oil 19 projects in multiple communities here in the 20 Bay Area right now. 21 That's unfortunately not that 22 unusual in this state where wholesale oil

202-234-4433 Neal R. Gross and Co., Inc. Page 168 1 switch is going on in this, as you know, 2 somewhat broken regulatory system. We're 3 grappling with it. 4 Here in the Bay Area the 5 refineries' workers' union has joined us 6 through the Refinery Action Collaborative to 7 tell all of the local agencies that are 8 reviewing these projects that are going 9 forward that we want to see transparency, 10 full disclosure of changes in the crude slate 11 and their impacts. 12 That just happened last month 13 formally. That's noteworthy for several 14 reasons. But ultimately, it would not have 15 happened except that workers are part of the 16 community. 17 So the answer to this question, do 18 we have the will, the 10,000 or so refinery 19 workers in California are part of communities 20 numbering in the millions. And together we 21 have the will to protect our health, our 22 safety, our lives and our children. Big oil

202-234-4433 Neal R. Gross and Co., Inc. Page 169 1 is wrong about that. Please adopt this 2 report tonight. 3 (Applause) 4 DR. HOROWITZ: Thank you, Mr. 5 Karras. And next is Guy, is it Bjerke? 6 (Off microphone discussion) 7 DR. HOROWITZ: Oh, how did I get 8 that right? Please do spell it though, 9 because -- 10 MR. BJERKE: I will. 11 DR. HOROWITZ: -- they're not all 12 as good as I am. 13 MR. BJERKE: All right. Thank you 14 very much. Hello, my name's Guy Bjerke, B-J- 15 E-R-K-E. And I'm with the Western States 16 Petroleum Association. 17 Thank you for providing an 18 opportunity for us to comment on the U.S. 19 Chemical Safety and Hazard Investigation 20 Board's regulatory report. 21 The Western States Petroleum 22 Association is a non-profit trade association

202-234-4433 Neal R. Gross and Co., Inc. Page 170 1 representing companies that explore for, 2 produce, refine, transport and market 3 petroleum, petroleum products, natural gas 4 and other energy supplies in California, 5 Arizona, Nevada, Oregon, Washington and 6 Hawaii. 7 Our members operate the major 8 refineries in California and are committed to 9 safe and reliable operations and open to 10 suggestions to enhance the safety of our 11 industry, our workers and our neighbors. 12 Learning from incidents is an 13 essential element of the process safety 14 management framework. And the U.S. Chemical 15 Safety Board reports have been important 16 sources of lessons learned. 17 WSPA submitted written comments 18 with the American Petroleum Institute on 19 January 3rd. And I agree with the comments 20 presented to you earlier tonight by Ron 21 Chittim of API. 22 Today, I just wanted to make a

202-234-4433 Neal R. Gross and Co., Inc. Page 171 1 couple specific comments on your report's 2 recommendations that California replace its 3 current process safety management regulatory 4 scheme with an alternative regulatory regimen 5 known as the Safety Case. 6 In short, WSPA believes your 7 recommendations concerning changes to 8 regulatory oversight can be integrated into 9 the existing PSM and risk management program 10 regulatory framework. 11 By so doing, we can accomplish 12 additional safety gains and continually 13 foster better relationships with employees 14 and communities without introducing any 15 unintended consequences and burdens 16 associated with a complete overhaul of the 17 existing regulatory framework. 18 Changing the regulatory approach 19 to the Safety Case without a better 20 understanding of what one gains from the 21 action will add complexity and uncertainty 22 with no demonstrated benefit that is readily

202-234-4433 Neal R. Gross and Co., Inc. Page 172 1 understood. 2 This added complexity may even 3 increase risk due to conflicting priorities 4 created by potential overlay of new 5 regulations. Efforts to improve the existing 6 PSM regulatory program should be explored 7 before pursuing the introduction of an 8 entirely new and different regulatory 9 approach. 10 For example, we believe that 11 industry could better achieve the proposed 12 benefits of the Safety Case from additional 13 skilled regulators at the state level who can 14 more actively participate in assuring 15 effective implementation of existing PSM and 16 RMP programs, secondly, by improving 17 processes to effectively manage risk through 18 assessment safeguards and mitigation. 19 Our members are actively working 20 and cooperating with the Governor's task 21 force. They are actively working and 22 cooperating with the City of Richmond, with

202-234-4433 Neal R. Gross and Co., Inc. Page 173 1 the County of Contra Costa in improvements to 2 the industry safety ordinance. And we 3 believe that better integrating the PSM and 4 RMP requirements will achieve the goals 5 outlined in this report. 6 To the extent the CSB sees other 7 areas for improvement, WSPA stands ready to 8 dialogue. And we appreciate the meeting that 9 we had with Don, Amanda, earlier this year to 10 discuss the report. We appreciate the 11 efforts the staff has taken to reach out to 12 our industry to include us in the discussions 13 and in the process. 14 WSPA would like to thank the CSB 15 for coming out tonight, for hearing and 16 taking input. And we look forward to working 17 with you to improve the safety of our 18 industry. Thank you very much. 19 DR. HOROWITZ: Thank you. And 20 next we have a question email from Mr. John 21 Morawetz. And he is the Health and Safety 22 Director for the International Chemical

202-234-4433 Neal R. Gross and Co., Inc. Page 174 1 Workers Union. 2 And he welcomes the report. He 3 says the presentation of the Safety Case 4 deserves significant deliberation before 5 acceptance. And he asks a question. 6 And he writes, "From tonight's 7 presentation and initial reading of Andrew 8 Hopkins, Australian Professor, a leading 9 proponent of this model, one of the key 10 elements is employee involvement which is a 11 part of the CSB recommendation for 12 triparthied review. 13 "How does the CSB believe the 14 Safety Case will be effective in non-union 15 facilities where it is unlikely there will be 16 meaningful worker involvement or ability to 17 raise suggestions that are not welcome by 18 some of their supervisors or in direct 19 opposition to stated supervisor positions?" 20 And I know we looked at this both 21 from the standpoint of the unionization rate 22 at the 15 California refineries as well as

202-234-4433 Neal R. Gross and Co., Inc. Page 175 1 how it might work in non-union facilities. 2 So I wonder if the team would like to answer 3 Mr. Morawetz's question? 4 MR. HOLMSTROM: Well, first of 5 all, it's in our report that the unionization 6 rate in California refineries is, I think, 7 over 75 percent. And we know that the 8 unionization rate in, I think, Norway is well 9 over 50 percent. The U.K. is 20-some 10 percent, Australia I think is similar. 11 And so there is already, I think, 12 a basis for workers who are represented to 13 use that representation in the course of 14 participating in a more rigorous safety 15 management regime. 16 The other thing I would add to 17 that is that the Safety Case applies worker 18 empowering and participation elements that 19 would apply to facilities where workers were 20 not represented. 21 And what we heard actually from 22 the union representatives in the U.K. and in

202-234-4433 Neal R. Gross and Co., Inc. Page 176 1 Norway, although offshore Norway is mostly, I 2 think, almost entirely unionized, is that 3 even in those facilities, because they 4 interact, workers and representatives get 5 together in groups like Step Change for 6 Safety. They interact, and they feel that 7 they have important exchanges with them, and 8 develop better relations and understand some 9 of the advantages and disadvantages of their 10 various positions. 11 And they feel they can work 12 together to improve safety. So they think 13 overall it is a positive reform, because it 14 empowers workers in both union and non-union 15 locations. 16 That's what we hear from unions in 17 the United Kingdom and Norway. Obviously 18 they would feel, when they expressed to us 19 that they have more significance, more say 20 and more influence when they're represented. 21 Because they have the power of their 22 membership behind them.

202-234-4433 Neal R. Gross and Co., Inc. Page 177 1 DR. HOROWITZ: Thanks. Next is 2 Kim Nibarger of the United Steelworkers. 3 MR. NIBARGER: My name's Kim 4 Nibarger, N-I-B-A-R-G-E-R. Good evening, Mr. 5 Chairman, fellow Board Members. 6 I'm a health and safety specialist 7 for the United Steelworkers International 8 Union. We're the union that represents the 9 operators and proprietary maintenance 10 employees at the Chevron Richmond Refinery. 11 Our members are responsible for 12 approximately two-thirds of domestic oil 13 production in this country in over 70 14 refineries. We also represent many more 15 workers in highly hazardous chemical plants 16 which fall under many of the same safety 17 regulations. 18 A Safety Case requires, as does 19 the OSHA process safety management PSM 20 standard, a written plan that the company is 21 required to comply with. As proposed by the 22 CSB, the Safety Case requires that the

202-234-4433 Neal R. Gross and Co., Inc. Page 178 1 company manage identified risks, keep as low 2 as reasonably practicable or ALARP. 3 PSM requires companies to follow 4 practices that are recognized and generally 5 accepted good engineering practices, RAGAGEP. 6 And so the union reviewed a number 7 of accidents in the petroleum industry dating 8 back to the early days of PSM. We noted one 9 commonality. Companies had a failure to 10 execute. They did not follow their written 11 plans. 12 It's the obligation of the company 13 to operate in a responsible manner. With 14 that in mind, the International Union had 15 some comments about the implementation and 16 workability of the recommendations contained 17 in this report. 18 The advent of the implementation 19 of the process safety management standard 20 gave all of us in the refining business great 21 hope of improving safety in the industry. 22 For a few years, accidents seemed

202-234-4433 Neal R. Gross and Co., Inc. Page 179 1 to be on the decline, having just experienced 2 the terrible accidents in the U.S. at 3 Phillips Chemical complex and the ARCO 4 Channelview Refinery. 5 Refiners seemed intent on 6 developing plans to meet the intent of the 7 performance based PSM standard. The early 8 OSHA inspections at PSM regulated facilities 9 seemed to follow a more prescriptive format, 10 that which the compliance officers were used 11 to performing. 12 That seemed to push the refiners 13 to obtaining documentation to support the 14 elements of the standard. For example, 15 training used to be pretty effective hands- 16 on, face to face. And that was turned into 17 computer based training. 18 It was easier to generate a sign- 19 in list by completing a trackable computer 20 program that to be sure every individual got 21 their name on a physical piece of paper. 22 Management of changes were easier

202-234-4433 Neal R. Gross and Co., Inc. Page 180 1 to pull up for the regulator if it was a 2 check the box activity on the computer rather 3 than a rigorous exercise performed in the 4 field with operators and engineers on what 5 will the potential downfall be if we make 6 this change and how can it be remedied. 7 Process hazard analyses were in 8 the review cycle and too often, when 9 reviewing potential hazards, the consensus 10 was, well, that doesn't happen here. It 11 hasn't happened here, so it was dismissed as 12 not being able to happen. 13 That same attitude is taking place 14 with risk analysis. Because it had not 15 happened in the facility, the risk was 16 assumed to be acceptable, even though 17 research would have told you it had happened 18 at several other refineries. 19 Managing risk has turned into 20 taking a risk. The companies have written 21 plans on how they are to meet the elements of 22 the PSM standard. A Safety Case would

202-234-4433 Neal R. Gross and Co., Inc. Page 181 1 require a written plan by the company on how 2 they would manage risk to as low as 3 practicable. 4 If refiners are not following 5 their current written plans, what makes you 6 think they will follow the written Safety 7 Case? 8 There are some good elements in 9 the PSM standard, and there are good elements 10 in the Safety Case. The Safety Case should 11 certainly be explored and considered. But 12 there may be more immediate benefit in trying 13 to beef up the elements of the PSM standard 14 that are weak. 15 And we have a list of some of the 16 things that we think need to be beefed up. 17 In the meantime, we cannot let the perfect be 18 the enemy of the good or forego useful 19 incremental changes in the search for a more 20 major change. 21 There are many things that Federal 22 OSHA, Cal/OSHA and currently through the

202-234-4433 Neal R. Gross and Co., Inc. Page 182 1 county Industrial Safety Ordinance could do 2 to improve the regulation of oil refineries 3 and other high hazard plants short of 4 adopting a full Safety Case framework. 5 It may be easier improving what is 6 in place, considering the litigious 7 environment we now face with nearly every 8 OSHA citation going to a solicitor under 9 contest and sometimes waiting years for a 10 trial date. 11 Meanwhile, the workers are exposed 12 to the hazards the company was cited for 13 while they fight over a legal interpretation. 14 More focus needs to be put on 15 including the workforce in helping the 16 company make improvements to safety for the 17 workers and the community. 18 The Safety Case language we have 19 reviewed from the U.K. has the same weak 20 consult language as does the PSM standard. 21 The USW would recommend convening an expert 22 panel to review the first recommendation and

202-234-4433 Neal R. Gross and Co., Inc. Page 183 1 explore the advantages and drawbacks of 2 implementing the Safety Case or adding some 3 clarity to and expanding the current PSM 4 standard to include some form of the Safety 5 Case. 6 We fully support the second 7 recommendation in this report on leading and 8 lagging indicators and have expressed our 9 willingness to work with the industry on that 10 matter so long as the process is fair and 11 gives us and other stakeholders a significant 12 voice. 13 As for the third recommendation, 14 the International Union is fully engaged in 15 responses to the request for information for 16 Executive Order 13650 and would like to see 17 the kind of improvements we are seeking in 18 OSHA's PSM standards to be rapidly 19 incorporated and embraced. 20 We look forward to working with 21 the CSB, the State of California and the 22 refiners nationwide to make this industry as

202-234-4433 Neal R. Gross and Co., Inc. Page 184 1 safe as it can be. Thank you. 2 (Applause) 3 DR. HOROWITZ: Thank you, Mr. 4 Nibarger. And Lionel Trepanier, I believe it 5 is, emails. And he's been very persistent in 6 getting his email through from the Utah Tar 7 Sands Resistance in a lengthy email, Mr. 8 Chairman. 9 So I think, with your permission, 10 we'll include it in the record. And I'll 11 just summarize his comment which is that they 12 generally agree with and support the CSB's 13 recommendations for substantial changes to 14 the way oil refiners are regulated. 15 But they must "vigorously 16 protest," their words, that the CSB is not 17 making similar recommendation in Utah. And 18 he notes Chevron's sulfidation incident in 19 Utah as well as other refinery incidents that 20 have occurred there and notes that Utah has 21 only six compliance inspectors in process 22 safety management.

202-234-4433 Neal R. Gross and Co., Inc. Page 185 1 And they support the CSB's 2 recommendation, and they ask for it to be 3 extended to the Government of Utah. 4 Next is Sandy Saeteurn from the 5 Asian Pacific Environmental Network. Thank 6 you. Could you spell your name please? 7 MS. SAETEURN: Yes. First name is 8 Sandy, last name is Saeteurn, S-A-E-T-E-U-R- 9 N, and Sandy Saeteurn, Richmond resident and 10 community organizer for the Asian Pacific 11 Environmental Network, APEN. 12 For those of you who aren't 13 familiar with APEN, we're an organization 14 that's 20 years old. Our mission is to 15 organize low income immigrant and refugee 16 communities here in Richmond, Oakland, as 17 well as across the State of California on 18 environmental justice issues. 19 And first off, APEN would like to 20 thank the CSB for conducting a thorough 21 investigation and providing real solutions 22 and recommendations that the community can

202-234-4433 Neal R. Gross and Co., Inc. Page 186 1 rally behind. 2 And today, we're here not only 3 with our Richmond fellow residents and the 4 community here, but we have our brothers and 5 sisters from our neighboring refinery cities. 6 And we're all here tonight because 7 we want the same thing. We want 8 environmental protections. We want justice. 9 And so we're all scared, of course. I know 10 I'm scared. I grew up here in Richmond, 11 lived right across the street from the 12 refinery, had to deal with a lot of incidents 13 that, you know, me as a kid growing up here 14 shouldn't have to be dealing with. 15 I had tons of health issues 16 growing up. And now I'm raising a family 17 here. So I definitely am concerned. I know 18 all of our community members are as well. 19 And we look to all of you, the regulatory 20 agencies, our elected officials and the 21 Government to do your job and protect us. 22 So tonight, as a Richmond resident

202-234-4433 Neal R. Gross and Co., Inc. Page 187 1 and an APEN representative, I'm proud to say 2 I, we, support the Safety Case regime. We 3 urge the Board to adopt the staff 4 recommendations, and we also look forward to 5 more imitation and engagement on the 6 development of strong health and safety 7 models. Thank you. 8 DR. HOROWITZ: Thank you. 9 (Applause) 10 DR. HOROWITZ: And next we have a 11 question email from Charlotte Brody, who is 12 the Vice-President for the BlueGreen 13 Alliance. 14 And she writes, "Do you agree that 15 one of the key components for the effective 16 use of the Safety Case is parity of power 17 that allows triparthied safety management and 18 decision making? If you do, how do you think 19 we get there in our current regulatory 20 environment?" 21 And she writes, "Thank you for 22 your work and for this public meeting."

202-234-4433 Neal R. Gross and Co., Inc. Page 188 1 Would anyone like to address that question, 2 as to how do you achieve the triparthied 3 system? 4 MR. HOLMSTROM: Well, I mean, we 5 think that, as we say in our report, that the 6 elements are already there. That in 7 California you have, I mean, you've heard 8 from, I think, the two major locals, both in 9 the comment period and also here tonight, 10 engage very eloquently about issues they're 11 facing that the two unions have. 12 So I think that that element is 13 certainly strong and very committed to 14 improving the system. 15 I think we've heard from the 16 regulators here tonight that they're also 17 committed to improving the system. And I 18 think the comment that I heard earlier about 19 having the will to change is an important 20 one. 21 And I think there's always a lot 22 of reasons to not take action. But I think

202-234-4433 Neal R. Gross and Co., Inc. Page 189 1 what I observe from the various parties here 2 in California ever since we engaged out here 3 last August was a strong will to change, and 4 improve and prevent these incidents from 5 occurring from a number of different 6 stakeholders. 7 And we've heard that from industry 8 as well. We've heard a strong desire from 9 industry that these incidents are not 10 acceptable from their perspective. And 11 they're going to do everything they can to 12 prevent them. 13 So I think that, from the will 14 standpoint, I think it's off the charts from 15 what we've seen. And that's been our 16 experience. And I think, as one speaker said 17 earlier, it's at the execution stage. And I 18 think that's where we're at right now. And 19 that's obviously always a critical stage, 20 when people (inaudible). 21 DR. HOROWITZ: Thank you. And 22 we'll go back to the room. Next is Nicole

202-234-4433 Neal R. Gross and Co., Inc. Page 190 1 Heath of the Contra Costa Hazardous Materials 2 Program, I guess it is. Ms. Heath, are you 3 here? Ms. Heath? Well, maybe not. 4 Next is Gail Bateson, Worksafe. 5 Ms. Bateson? 6 MALE PARTICIPANT: She's over in 7 the comment section. 8 DR. HOROWITZ: Oh, there you are. 9 MS. BATESON: Thank you, good 10 evening. My name is Gail Bateson. It's 11 spelled B-A-T-E-S-O-N. I'm the executive 12 director of Worksafe. We're a statewide 13 advocacy group. 14 But I wanted to mention that I 15 also previously worked for almost two decades 16 with the Oil, Chemical and Atomic Workers 17 Union on their PSM curriculum and also with 18 the Labor Occupational Health Program 19 developing their human factors curriculum to 20 implement the countywide Industrial Safety 21 Ordinance. 22 I'd like to begin by thanking the

202-234-4433 Neal R. Gross and Co., Inc. Page 191 1 CSB members, and Chair and the staff for 2 coming out to the community, and not only for 3 that but for the work that you do and for 4 your work to really get through these 5 investigations, to find the root causes of 6 incidents but also for your consideration of 7 some new perspectives and approaches to 8 prevention. 9 Overall, while I think the Safety 10 Case approach is appealing, I actually agree 11 with several of the written comments on the 12 Website that point out that there are some 13 important underlying conditions that must be 14 in place before we can move away from the PSM 15 standard and embrace more of the Safety Case 16 approach, in particular, Steve Gill of the 17 U.K., and Naj Meshkati and many of the 18 comments made by Ms. Rosenberg. 19 I think at best it's a very long 20 term goal. And given the current state of 21 Cal/OSHA I think we're far from ready, 22 although I certainly appreciate the steps

202-234-4433 Neal R. Gross and Co., Inc. Page 192 1 outlined by Mike Wilson earlier. I think we 2 need to take a real assessment of where we 3 are right now. 4 But there are some short term 5 immediate recommendations that, if enacted, 6 could lay the foundation for, down the road, 7 integrating more of a Safety Case approach. 8 And a couple of these are, first, 9 to recommend to the Governor that California 10 reform its labor code to require the timely 11 abatement of serious violations. This was 12 raised by Congressman Miller. 13 This is a law that exists in 14 Oregon, and Washington and really throughout 15 the country through the IMAGE (phonetic) 16 program. And it's working very well at all 17 three locations. And we know this because we 18 have, through our office, interviewed the top 19 officers of all three of those programs. 20 So it really helps a great deal to 21 have that kind of recommendation coming from 22 the CSB to the Governor.

202-234-4433 Neal R. Gross and Co., Inc. Page 193 1 A second related point is that CSB 2 had a recommendation that Chevron make 3 certain changes in all of their (inaudible) 4 facilities. Now, I understand this is fairly 5 typical recommendation you make. It's 6 important to note that in California we still 7 do not ever have a repeat citation policy 8 which really ties the hands of the agency 9 when it finds similar violations at other 10 facilities in California, such as the people 11 who came up here from Los Angeles. 12 So having a repeat policy that's 13 at least as effective as Federal OSHA, with 14 Cal/OSHA's enforcement agency much more teeth 15 right away, not only across the refineries 16 but across the chemical plants and all the 17 facilities in California. Federal OSHA's 18 repeatedly raised this with Cal/OSHA through 19 its annual FAME audits. 20 We have had a lot of talk about 21 different regulatory regimes. But they will 22 really only work with effective enforcement

202-234-4433 Neal R. Gross and Co., Inc. Page 194 1 and adequate staffing. 2 And it's important to mention that 3 Cal/OSHA does have a couple of very special 4 strong tools. One is it actually does have 5 authority under its PSM to address inadequate 6 process hazard analyses and to cite the 7 companies for these. And they have done that 8 on some occasions. So that authority exists. 9 California is also unique to have 10 what we call orders prohibiting use, OP use 11 (phonetic). And as you know, that was used 12 in the Chevron Refinery to shutdown a unit 13 for eight months. So there're some really 14 great tools we have. 15 But what we really need is more 16 adequate staffing. And I think that we need 17 more than just more inspectors in this 18 isolated PSM unit but also throughout the 19 agency for when the citations get appealed. 20 Then you need to have the legal unit and 21 other experts come in and defend. So it just 22 can't be the PSM unit itself.

202-234-4433 Neal R. Gross and Co., Inc. Page 195 1 So if you look at what Federal 2 OSHA thinks we should have on benchmarks for 3 Cal/OSHA for inspectors it's 805. If you 4 look at what we should have if we had the 5 equivalent of what Oregon or Washington has, 6 we'd have close to 900. 7 But what do we have, in fact, 165, 8 and no real plan to change that except for 9 the latest budget which has 12 new safety 10 engineers, which I assume are going to the 11 PSM unit. 12 So we really need specific 13 instructions from you of what would be 14 adequate staffing if we're going to look for 15 the more aggressive safety regime approach. 16 Similarly, we commend your 17 recommendation to move for the more 18 triparthied model. But again, we agree with 19 some of the comments by Naj Meshkati about 20 the importance. In order to have true 21 employee involvement, that above that you 22 have to have genuine management commitment

202-234-4433 Neal R. Gross and Co., Inc. Page 196 1 and a safety culture. 2 And that means not just have the 3 operating plants here in California, but at 4 the parent company at the international level 5 where the major financial decisions are made 6 about investments in maintenance and 7 operations. 8 Employees may be participating on 9 some of these teams to do PHAs and some of 10 the follow-up recommendations so it can look 11 like there's employee involvement. But as 12 the interim CSB report showed, upper 13 management at Chevron often ignored internal 14 recommendations. 15 Years ago when I was working for 16 OCAW, I learned from workers at the Richmond 17 Refinery about how draft PHA reports were 18 always far more detailed with all kinds of 19 specific findings and recommendations. 20 But when the final PHAs were 21 reviewed and issued, as they generally do by 22 the legal department, they were much more

202-234-4433 Neal R. Gross and Co., Inc. Page 197 1 general and much less useful in terms of 2 pinpointing what the actual problems were. 3 So the problem was not employee 4 involvement but management commitment to 5 addressing hazards in a serious way. 6 Finally, I support the concept of 7 leading and lagging indicators. It's a great 8 idea that can be done immediately. It can 9 provide a more comprehensive set of factors 10 to consider when targeting inspections. And 11 Cal/OSHA already has the discretion in their 12 mandate to do that. 13 So finally, I just wanted to say, 14 and I think Henry mentioned it too about the 15 General Chemical spill, if anyone was around 16 here for that, California should expand this 17 initiative not only to protect people living 18 near refineries but also chemical plants that 19 kind of alter the whole jurisdiction of PSM. 20 And again, I want to thank you for 21 coming out tonight to Richmond to hear from 22 the community.

202-234-4433 Neal R. Gross and Co., Inc. Page 198 1 DR. HOROWITZ: Thank you, Ms. 2 Bateson. 3 (Applause) 4 DR. HOROWITZ: Next is Eduardo 5 Martinez representing the Richmond 6 Progressive Alliance. Mr. Martinez? 7 MR. MARTINEZ: Good evening. My 8 name is Eduardo Martinez, M-A-R-T-I-N-E-Z. 9 Environmental and community organizations, 10 residents of Richmond and Contra Costa 11 County, thank you for your investigation of 12 the Chevron fire and Chevron's managerial and 13 organizational culture that allowed the fire 14 to happen. 15 We thank you for your 16 recommendations to improve the safety 17 practices of the oil industry in the United 18 States. We welcome the Safety Care regime as 19 a method to shift from a system of crises 20 management to a system of best practices for 21 safety. 22 What we have today is a static

202-234-4433 Neal R. Gross and Co., Inc. Page 199 1 regulatory system that is managed by a strong 2 industry, a weak labor force and a weak 3 Government representation. 4 We see the strength of the oil 5 industry and the influence they wield in 6 public opinion and policy with their lobbiers 7 and their advertising. We see their strength 8 in the millions of dollars they spend on 9 local elections. 10 We see the weakness in unions when 11 industry is able to ignore their efforts and 12 their recommendations. We see the weakness 13 of unions when Government interferes with 14 their efforts to exert their power. 15 We see the weakness of our 16 Government when our legislators are unable to 17 hold the industry accountable, when our 18 Government can only fine Chevron less than 19 what they spend in a local election for 20 criminal actions for the fire created by 21 negligence. 22 So Richmond is in a special place

202-234-4433 Neal R. Gross and Co., Inc. Page 200 1 in that the city issues permits to Chevron 2 projects. Under the current system, these 3 permits have been approved on the words of 4 Chevron representation. But that must end. 5 Chevron must finance independent 6 regulators chosen by the city with guidance 7 of unions and local environmental groups. 8 And if Chevron does not meet the Safety Case 9 requirements, the regulators should have the 10 power to stop any processing in the sections 11 that fail the inspections. 12 Concern was voiced over a weak 13 Safety Case regime, but the flexibility of 14 the Safety Case regime would enable changes 15 which is not the case now. 16 The Contra Costa community has 17 awakened. We will make sure that we have a 18 strong Safety Case regime by pushing our 19 Government to do the right things necessary 20 for safety and by supporting our unions. 21 The unions are our first line in 22 defense against the excesses of industry. As

202-234-4433 Neal R. Gross and Co., Inc. Page 201 1 citizens, community members, we'll monitor 2 the actions taken by all involved in ensuring 3 our safety. Let's make this happen, thank 4 you. 5 (Applause) 6 DR. HOROWITZ: Thank you, Mr. 7 Martinez. And next we'll go to Diane Bailey 8 of the Natural Resources Defense Council. 9 Ms. Bailey? 10 Good evening, Chairman Moure- 11 Eraso, and Board members and staff. My name 12 is Diane Bailey. I'm a scientist with the 13 Natural Resources Defense Council. And we're 14 also members of the Bay Area Refinery Action 15 Collaborative. 16 I'm here today in strong support 17 of the CSB recommendations, including the 18 Safety Case. We're very grateful that you 19 came here to this community tonight and that 20 you're making a very serious effort to 21 address and improve refinery safety. 22 I want to echo and highlight just

202-234-4433 Neal R. Gross and Co., Inc. Page 202 1 briefly some of the comments that you've 2 already heard tonight. First, I'll note 3 Board member Griffon's comments about how 4 it's really not an either/or choice between 5 the Safety Case and regulation. We need 6 both. And we agree. 7 We support the staff's 8 recommendations on the Safety Case with many 9 of the strengthening recommendations that 10 you've heard here tonight, particularly from 11 the representatives of Congressman Miller and 12 Supervisor Gioia's office. 13 These were things like improved 14 enforcement, for example, giving the Contra 15 Costa County more authority for direct 16 enforcement, providing sufficient resources 17 for more qualified inspections and 18 inspectors, requiring the refineries to adopt 19 best practices and also timely abatement. 20 These are just some of the 21 strengthening provisions that I think that 22 you've heard a lot tonight. We really need a

202-234-4433 Neal R. Gross and Co., Inc. Page 203 1 proactive approach to refinery safety to 2 replace the current reactive approach. 3 Chevron, in its comments, says 4 that the current safety measures are working 5 just fine, and they support the status quo. 6 However, as your staff noted, in 7 2012 we saw 125 refinery safety incidents, 17 8 of which were in California, including the 9 August 6th, 2012, fire at Chevron Richmond. 10 And that sent 15,000 residents to the 11 hospitals as we've heard so much. And that's 12 the status quo, and the status quo must go. 13 As California faces the import of 14 ever dirtier, and more corrosive and more 15 dangerous crude oils, it is now more 16 important than ever that refinery safety be 17 improved. 18 I'll note that we strongly 19 support the many comments that the 20 steelworkers have made. We think that the 21 voice of the workers at refineries is really 22 essential to informing this process and

202-234-4433 Neal R. Gross and Co., Inc. Page 204 1 continuing to improve safety measures. 2 It's essential that the oil 3 industry be held accountable. We cannot let 4 the incident of August 6th, 2012, ever, ever 5 happen again. This is what the community 6 deserves. Thank you. 7 (Applause) 8 DR. HOROWITZ: Thank you, Ms. 9 Bailey. And next we go to Ross Nakasone, I 10 believe it is, of the BlueGreen Alliance. 11 Did I say that correctly, sir? 12 MR. NAKASONE: The BlueGreen 13 Alliance, yes. 14 (Laughter) 15 MR. NAKASONE: Ross Nakasone with 16 the BlueGreen Alliance, N-A-K-A-S-O-N-E. 17 DR. HOROWITZ: Yes, thank you. 18 MR. NAKASONE: Good evening. I'm 19 the California policy organizer with the 20 BlueGreen Alliance. The BlueGreen Alliance 21 (inaudible) via email is a national non- 22 profit that unites ten of the largest unions

202-234-4433 Neal R. Gross and Co., Inc. Page 205 1 here in the United States as well as four of 2 the larger environmental groups as well, 3 including NRDC and the Sierra Club. 4 We also are a partner in the 5 Refinery Action Collaborative of the Bay 6 Area. And we support the analysis and 7 direction of the CSB report on the Chevron 8 incident. 9 And specifically we commend the 10 report for accurately recognizing that 11 Chevron management repeatedly neglected to 12 respond to warnings, concerns and 13 recommendations issued by workers and 14 technical staff at the Richmond facility. 15 Even though Richmond Chevron 16 workers recommended employing inherently 17 safer systems due to management of change 18 process, Chevron management ignored those 19 recommendations. 20 We also commend the report's 21 acknowledgment that the California process 22 safety management standard needs to be

202-234-4433 Neal R. Gross and Co., Inc. Page 206 1 strengthened in order to prevent such 2 disasters from occurring again. (Inaudible) 3 referencing sulfidation corrosion as has been 4 discussed before. 5 And we also agree with the report 6 in recognizing that Cal/OSHA's ability to 7 sufficiently inspect the facilities and 8 report regulations is hampered by severe 9 under-staffing and under-funding of the 10 agency. 11 And so in accord with all of that, 12 I'd like to highlight the three 13 recommendations that would make an effective 14 system, and you've heard them before. 15 But I think they're worth 16 mentioning again, adequate financial and 17 personnel resources for Government agencies 18 to ensure more robust enforcement and 19 oversight and strong enforceable 20 requirements, including job protection, to 21 ensure meaningful worker involvement in 22 directing or preventing future accidents and

202-234-4433 Neal R. Gross and Co., Inc. Page 207 1 to clear focus and outcomes that are measured 2 by group safety rather than box checking. 3 Again, thank you so much for all 4 your work and the staff's work. It's really 5 quite a tremendous effort. And thank you for 6 your leadership. 7 DR. HOROWITZ: Thank you very 8 much. 9 (Applause) 10 DR. HOROWITZ: Next we'll go to 11 Andres Soto of Communities for a Better 12 Environment and the Richmond Progressive 13 Alliance. Mr. Soto, are you here? Oh, there 14 you are. 15 MR. SOTO: Good evening, Mr. Chair 16 and members of the Board, for coming here to 17 Richmond. I would like to thank you very 18 much, as well as for the work of your staff, 19 the diligent work that they've been doing to 20 examine really the causes of this. 21 And essentially it validates what 22 we in the community have been saying for

202-234-4433 Neal R. Gross and Co., Inc. Page 208 1 years, that Chevron and, by extension, the 2 industry in general, the WSPA folks and API 3 folks, that they put profits ahead of health 4 and safety. 5 They put profits ahead of the 6 health and safety of the community members, 7 of the labor force, and they squeeze every 8 penny that they can to enrich their 9 shareholders. 10 I had the benefit of attending the 11 Chevron shareholders meeting in 2013 in San 12 Ramon at their headquarters, their corporate 13 headquarters. I had to pass through a 14 phalanx of security, metal detectors, all 15 sorts of things. 16 And then once I got inside there, 17 it was really a parallel universe. Their 18 world is not the same as our world. And 19 those of us who are in the community and have 20 lived here in the shadow of these refineries, 21 have endured the flaring, endured the 22 consistent pollution, not just the episodic

202-234-4433 Neal R. Gross and Co., Inc. Page 209 1 pollution but also the persistent pollution 2 that has injured our community, not only 3 through cancers and asthma and all other 4 sorts of autoimmune diseases, but also the 5 way they have injured our democracy. 6 And particularly, this gets to the 7 question of the political will to actually 8 enforce some of these changes, make these 9 changes and make them enforceable as your 10 staff has recommended. 11 We, here in Richmond, just in the 12 last election, Chevron spent $1.2 million 13 which is more than the record fines they paid 14 for this incident. And that's in a local 15 city council election. Imagine what they're 16 spending in Sacramento, not to mention 17 Washington and all the other state capitals. 18 So that's the challenge that you 19 guys have presented to us and that we are 20 going to take on. And that's the challenge 21 that we are going to have to present to our 22 elected officials, you know.

202-234-4433 Neal R. Gross and Co., Inc. Page 210 1 We need the transparency of this 2 regulatory scheme, not just for the workers 3 but for the community. This issue, this 4 hiding behind the skirt of trade secrets is 5 really not a system that is going to impact 6 our community in a positive way. 7 And we have to strip that away. 8 Because these guys trade this stuff back and 9 forth. They're a cartel. We know that 10 because of the way they're planning their 11 bringing in of the North Dakota Bakken and 12 the tar sands into the Bay Area via rail, the 13 rolling pipelines, and the dangers that 14 presents. 15 That's not your bailiwick right 16 now. I guess that would be the NTSB, your 17 counterparts. But, you know, that makes our 18 lives complicated here. 19 But here in the Bay Area, we're 20 very lucky, because we have a long history of 21 experience in learning about this stuff. The 22 information presented in these reports has

202-234-4433 Neal R. Gross and Co., Inc. Page 211 1 been tremendously educational to our 2 community and to this region in general. 3 And so I want to thank you. I 4 urge you to adopt the recommendations of your 5 staff. If you need to take these necessary 6 recommendations or amendments that seem to 7 really reinforce what everybody is saying, 8 then go ahead and do that. 9 But I think we want to begin 10 implementing the Safety Case right here in 11 Richmond, right now. We want to do it 12 through our Industrial Safety Ordinance in 13 Richmond and Contra Costa County. 14 We need to have one in Pittsburgh, 15 because of the WesPac project and then, 16 ultimately, in Solano County because of 17 Venetia and, of course, our counterparts in 18 Southern California. 19 So I'll leave it at that. But 20 because of your great work, we want to 21 present you guys with some plaques of our 22 thank you for your great work.

202-234-4433 Neal R. Gross and Co., Inc. Page 212 1 (Applause) 2 CHAIRPERSON MOURE-ERASO: I 3 gratefully would like to say that we accept 4 them, with a lot of pride. 5 (Laughter) 6 CHAIRPERSON MOURE-ERASO: This is 7 one of the best reactions that we get from a 8 community for our work. And we are very, 9 very proud to have received this from you. 10 Thank you. 11 MR. SOTO: Well, thank you very 12 much. And once again, thank you to you and 13 your whole team. 14 (Applause) 15 DR. HOROWITZ: Thank you, Andres. 16 And next up is John Bresland, representing 17 Process Safety Risk Assessment. And Mr. 18 Bresland is a long time former CSB Board 19 member and also made the journey from West 20 Virginia with me, I guess, today, although 21 not on the same airplane. 22 MR. BRESLAND: Yes. It seems much

202-234-4433 Neal R. Gross and Co., Inc. Page 213 1 safer to be here at the -- 2 (Laughter) 3 DR. HOROWITZ: It does indeed. 4 MR. BRESLAND: I don't have any 5 plaques for you. Maybe I brought a message 6 that they don't quite appreciate us as much 7 as the one that can (phonetic). 8 Good evening, my name is John 9 Bresland, spelled B-R-E-S-L-A-N-D. I'm a 10 former chairperson and Board member of the 11 Chemical Safety Board. I had the pleasure of 12 serving the CSB for ten years. 13 I appreciate this opportunity to 14 make a statement regarding the CSB's 15 recommendation that California implement what 16 is known as the Safety Case. 17 I have over 40 years experience 18 with process safety, both in industry and 19 with the U.S. Government. Throughout my 20 career, including my tenure at the CSB, I've 21 focused on effective ways to prevent or 22 minimize the consequences of process safety

202-234-4433 Neal R. Gross and Co., Inc. Page 214 1 accidents such as fires, explosions and toxic 2 releases. 3 I know that incidents like these 4 hit close to home. As a CSB Board member I 5 met with families whose lives were forever 6 changed because of catastrophic accidents. 7 I understand the fear, the anger 8 and the uncertainty that grips the workforce 9 and the surrounding community following these 10 types of events. 11 I share the common desire of 12 workers, employers, elected officials and 13 communities to ensure that the facilities 14 operate safely. And most importantly, I 15 recognize that changes are required to 16 prevent process safety accidents from 17 occurring. 18 Calls for regulatory changes are 19 appropriate. It is important, however, to 20 ensure that we do not make decisions in haste 21 or simply for the purpose of change. To be 22 credible, findings and recommendations

202-234-4433 Neal R. Gross and Co., Inc. Page 215 1 arising from incident investigations must be 2 grounded in rigorous scientific and 3 engineering principles. 4 Arguments used to support them 5 must be supported by data and evidence that 6 has been subjected to rigorous technical 7 scrutiny. 8 Only then can we be certain that 9 we've identified the true root causes of an 10 incident and have developed effective 11 recommendations to prevent a recurrence. 12 Unfortunately, the CSB Safety Case 13 recommendations fall far short in this 14 regard. There is no empirical evidence that 15 the Safety Case is more effective at 16 preventing process safety incidents than 17 other regulatory approaches, including 18 California's process safety management 19 standard. 20 The CSB admits as much when it 21 states in the report that, "There have been 22 few objective studies conducted on the impact

202-234-4433 Neal R. Gross and Co., Inc. Page 216 1 of the Safety Case regulatory approach on 2 safety performance." 3 As a result, the CSB is left to 4 promote the benefits of a regulatory regime 5 unfamiliar to U.S. regulators and industry 6 alike through what is little more than a 7 limited survey of anecdotal reports and 8 personal opinions. 9 I'm not alone in my concern. A 10 number of highly regarded safety experts have 11 urged the CSB not to approve this 12 recommendation. 13 Dr. Nancy Leveson, for example, 14 has worked in the area of system safety for 15 34 years. She is currently a professor of 16 aeronautics and astronautics and a professor 17 of engineering systems at the Massachusetts 18 Institute of Technology. 19 In the area of public accident 20 investigation, she served as a senior 21 consultant for the Commission on Deep Water 22 Horizon and as a member of the Baker Panel.

202-234-4433 Neal R. Gross and Co., Inc. Page 217 1 Dr. Leveson has written a letter, 2 mentioned already this evening, has written a 3 letter to the CSB which expresses her strong 4 reservations about the Safety Case. And I 5 have a copy of her letter for introduction 6 into the record for this evening's meeting. 7 Dr. Leveson states that there is 8 insufficient objective evidence that the 9 Safety Case is superior to other regulatory 10 approaches or that it more effectively 11 promotes and improves process safety. 12 Careful evaluation in comparison 13 of the efficacy of the available approaches, 14 including the Safety Case, simply has not 15 been done. 16 She adds, "Most papers addressing 17 or promoting the use of the Safety Case 18 regimes ignore the fundamental question of 19 whether a Safety Case regime is effective, 20 let alone more effective than other 21 approaches. 22 Unfortunately, the draft

202-234-4433 Neal R. Gross and Co., Inc. Page 218 1 regulatory report suffers a similar 2 deficiency in that CSB has offered little 3 more than personal opinions regarding the 4 effectiveness of the Safety Case regime 5 supported by reference to other personal 6 opinions. 7 A far more thorough empirical 8 analysis is required before the CSB should 9 recommend such a sweeping change. In fact, 10 Dr. Leveson believes that, if anything, the 11 weight of the available evidence indicates 12 that the Safety Case offers no superior 13 protection against process safety incidents. 14 She observes that (inaudible) 15 Safety Cases have been faulted in numerous 16 accident reports. For these reasons, Dr. 17 Leveson very recently confirmed to me her 18 belief that, "This idea of using Safety Cases 19 in the U.S. is a very odd one." 20 I'm also concerned that the CSB 21 has not adequately considered or disclosed 22 the burdens and potential consequences of the

202-234-4433 Neal R. Gross and Co., Inc. Page 219 1 fundamental change that it is proposing. The 2 CSB report fails to consider the very real 3 potential for diminished safety reforms 4 during a transition to the Safety Case. 5 The Safety Case cannot be achieved 6 by executive directive. It can only be 7 implemented through legislative action. It 8 will take years to implement and comes at a 9 significant cost. 10 Every dollar spent by the State of 11 California to implement the Safety Case 12 approach is a dollar that is not spent on 13 other efforts including the existing process 14 safety programs. 15 Every hour spent by an inspector 16 learning how to implement the Safety Case is 17 an hour not spent on an on-site inspection. 18 Without clear empirical data showing a 19 guaranteed benefit, these tradeoffs are not 20 acceptable. 21 Dr. Leveson again shares my 22 concerns. She is worried that the agency

202-234-4433 Neal R. Gross and Co., Inc. Page 220 1 does not fully appreciate the resources that 2 the State of California would need to 3 implement the Safety Case recommendation. 4 Dr. Leveson believes that the 5 effective implementation of the Safety Case 6 would require California to allocate millions 7 of dollars to the hiring and training of a 8 significant number of additional regulators 9 and inspectors. 10 I believe that the CSB needs to 11 first conduct a rigorous technical study of 12 the different regulatory regimes so that it 13 can develop a meaningful data on which it can 14 then base a recommendation. 15 If there is a demonstrated benefit 16 to the Safety Case, elected officials and 17 regulators can then make an informed decision 18 about whether its benefits outweigh the 19 costs. 20 But the CSB is aware Federal OSHA 21 is working to improve the PSM standard 22 through a recently issued request for

202-234-4433 Neal R. Gross and Co., Inc. Page 221 1 information. 2 Furthermore, President Obama has 3 signed an Executive Order establishing a 4 federal multi-agency chemical facility and 5 safety and security working group with a 6 mandate to further improve chemical facility 7 safety and security in coordination with 8 owners and operators. 9 With these efforts underway, a 10 better approach would be for CSB to study the 11 Safety Case while exploring efforts to 12 improve the existing process safety 13 management program. 14 And for these reasons, I 15 respectfully oppose the CSB recommendation 16 directed to the State of California to 17 implement the Safety Case. Thank you for the 18 opportunity to speak here this evening. 19 DR. HOROWITZ: Thank you. Was 20 there a -- 21 (Applause) 22 DR. HOROWITZ: -- a letter that

202-234-4433 Neal R. Gross and Co., Inc. Page 222 1 you wanted to -- 2 MR. BRESLAND: I'll get it for 3 you. 4 DR. HOROWITZ: Okay. George R. 5 Monterrey, Mr. Monterrey? 6 MR. MONTERREY: Yes, my name is 7 George Monterrey. And it's spelled M-O-N-T- 8 E-R-R-E-Y. And thank you, CSB Board, for 9 letting me speak here tonight. 10 I represent PEC, Pittsburgh Ethics 11 Council. And in Pittsburgh we are upset that 12 our city council would consider a dangerous 13 product like WesPac and not notifying us 14 about this project. 15 WesPac is trying to refurbish and 16 build a huge storage and transfer terminal 17 for crude oils brought in by rail and barge 18 on an old and decrepit PG&E plant that has 19 not been in service for two decades. 20 And, it being so close to our 21 homes, schools, parks and churches, we stand 22 in support of the Chemical Safety Board's

202-234-4433 Neal R. Gross and Co., Inc. Page 223 1 recommendation for Safety Case regime before 2 any crude oil related project can start up. 3 If we have the Safety Case regime 4 now, WesPac's dirty crude by rail could not 5 go forward. So Pittsburgh would like you to 6 adopt the Safety Case regime. 7 And in closing, the gentleman that 8 spoke, all the gentleman that spoke for the 9 petroleum industry, they're still for the 10 crude. 11 (Applause) 12 DR. HOROWITZ: Thank you, Mr. 13 Monterrey. Next is Mr. Roger Lin of CBE. 14 Mr. Lin? 15 MR. LIN: Good evening, members of 16 the Board. I'm Roger Lin, L-I-N. I'm an 17 attorney with Communities for a Better 18 Environment. Thank you again for coming to 19 Richmond. I won't keep you long, just three 20 really quick points. 21 First, your staff's thorough and 22 extensive work correctly (phonetic) done by

202-234-4433 Neal R. Gross and Co., Inc. Page 224 1 the current refinery safety system is broken. 2 We need systems in place that would never 3 allow Chevron management to ignore the advice 4 of its own safety inspectors. 5 Second, the Safety Case regulatory 6 regime properly shifts risk management 7 responsibility to the company and its 8 employees and requires continuous risk 9 reduction. This community needs the Safety 10 Case. 11 Most of all, and in all due 12 respect to the prior chairperson of the CSB, 13 it replaces the relatively insignificant 14 fines that are basically like chump change to 15 the refineries with an actionable license to 16 operate. We need this. 17 Third and finally, to effectively 18 implement this new regulatory regime, it's 19 essential to obtain real and meaningful 20 community and worker participation. These 21 are the eyes and ears that will assist 22 regulators to ensure effective

202-234-4433 Neal R. Gross and Co., Inc. Page 225 1 implementation. 2 And as the Board's highlighted 3 tonight, the opinion of workers and community 4 must be given the same participatory weight 5 as industry and regulators. 6 If there are any doubts about the 7 effectiveness of this participation, remember 8 that this community, this community busted 9 Chevron for trying to hide the company's 10 switch to refining a lower quality oil feed 11 supplement. 12 And the Court of Appeal agreed 13 with us. We can get there without 14 litigation. But first we have to have that 15 equal weight participation. 16 Finally, this problem is real, 17 urgent and just as big, if not bigger, than 18 the required solution. Thank you again for 19 your time. Please adopt your staff's 20 recommendation. As I said, they're a great 21 start. 22 (Applause)

202-234-4433 Neal R. Gross and Co., Inc. Page 226 1 DR. HOROWITZ: Thank you, Mr. Lin. 2 Melvin Willis, ACCE. Mr. Willis? Thank you. 3 MR. WILLIS: Good evening, members 4 of the Board and staff, Melvin Willis, W-I-L- 5 L-I-S. 6 The last time you guys were out 7 here and came up with those great 8 recommendations for modernizing refineries as 9 nationwide recommendations, I sat here before 10 you and told you that when those 11 recommendations were made on the pipe that 12 exploded in 2012, happened in actually 2002. 13 I was 12 years old when those recommendations 14 were made. 15 And then in 2012, ten years later, 16 it was still left unattended, you know, pure 17 negligence. And nothing was done at the age 18 when I turned 22. 19 This is definitely something that 20 is really needed. I've heard arguments 21 saying that the current standards are okay 22 today but clearly not, if under those same

202-234-4433 Neal R. Gross and Co., Inc. Page 227 1 standards 15,000 people went to the hospital 2 and almost 19 workers have lost their lives 3 under those standards. 4 So just, you know, I don't want to 5 take any more of your time. You guys have 6 heard it all. 7 But one thing that I would ask 8 that be put on these recommendations for your 9 consideration is that when you recommend 10 these to the cities, states and other 11 entities that you say that these 12 recommendations should be immediately 13 adopted. Thank you very much. 14 (Applause) 15 DR. HOROWITZ: Thank you, Mr. 16 Willis. And next we will go to Mr. Andy 17 Katz. Mr. Katz, are you here? 18 MR. KATZ: Good evening, Board 19 members. My name is Andy Katz. I'm a 20 director at the East Bay Municipal Utility 21 District, and I'm a Clean Air advocate for 22 Breathe California, a public health

202-234-4433 Neal R. Gross and Co., Inc. Page 228 1 organization. 2 And we're here to support the 3 community, and the workers and the Chemical 4 Safety Board's recommendations. And I 5 encourage you to adopt the report in front of 6 you. 7 Your report is supported by your 8 findings. And your findings are supported by 9 the facts. Your report very well illustrates 10 the failures in the current system, the 11 failure of the facility to prevent the 12 disaster on August 6th, 2012, a failure to 13 perform adequate maintenance and the failure 14 to implement inherently safer technology that 15 would have prevented the sulphide corrosion 16 that was a major cause of the refinery 17 explosion. 18 The report goes into a number of 19 excellent issues. It discusses the 20 coordination between the agencies, 21 transparency and the empowerment of workers 22 through the triparthied system.

202-234-4433 Neal R. Gross and Co., Inc. Page 229 1 It's important to emphasize what 2 you've talked about in terms of regulator 3 competence and resources. But what's most 4 important about the Safety Case is ensuring 5 that there will be inherently safer 6 technology as a core component of the Safety 7 Case. 8 The demonstration to the regulator 9 that there must be the safest standard 10 achieved, that's a major improvement compared 11 to the current system and will help keep the 12 community safe, help keep the community 13 healthy and protected from future disasters. 14 I fully encourage the authority to 15 adopt the report in front of you to ensure 16 that we have the community's health and 17 safety protected. 18 I also encourage you to look at 19 the recommendations made by the elected 20 officials, Mayor McLaughlin, Vice-Mayor 21 Jovanka Beckles, Supervisor John Gioia and 22 Congressman Miller and follow through with

202-234-4433 Neal R. Gross and Co., Inc. Page 230 1 their recommendations in a subsequent report. 2 Because the issues have been 3 raised, such as Cal/OSHA improvements, the 4 ability for Cal/OSHA to be able to abate 5 violations in a faster fashion, inter-agency 6 roles, especially the ability of local 7 agencies to be able to take enforcement 8 actions, and many of those other suggestions 9 documented in their written letters. 10 It's very important to follow-up 11 on these issues. And I encourage those to be 12 looked at in a forthcoming report following 13 adoption of your current report tonight. 14 The follow through of the Chemical 15 Safety Board would be much appreciated. All 16 of your great work today, you fully deserve 17 the plaques that you were given tonight and 18 hopefully much more appreciation that those 19 symbolize. 20 Your independent voice and your 21 technical capacity has brought a real change 22 to the conversation, a real call to action.

202-234-4433 Neal R. Gross and Co., Inc. Page 231 1 And I thank you so much for providing those 2 resources and that momentum to this 3 community. Thank you. 4 (Applause) 5 DR. HOROWITZ: Thank you very 6 much, Mr. Katz. And now we'll go to Mike 7 Parker of the Richmond Progressive Alliance. 8 Mr. Parker? 9 MR. PARKER: Mike Parker, P-A-R-K- 10 E-R. It's a funny thing about regulation and 11 politics. Change only happens really in 12 spurts in response to incidents when the 13 public is focused on it and paying attention. 14 The net result of asking for 15 delays, and dragging things out and 16 perfecting things before things happen is, in 17 reality, a way to kill things. That's 18 because the public will not continue to focus 19 on this because there will be other incidents 20 and other problems that will happen. 21 Therefore, what I'm saying is that 22 the calls for delay by and large are calls

202-234-4433 Neal R. Gross and Co., Inc. Page 232 1 for maintaining the status quo. And that's 2 the one thing we cannot afford in the system. 3 So I urge adoption of what you 4 have here and it's clearly safer. After all, 5 it's only a recommendation. It just starts 6 the process somewhere else. This isn't the 7 final answer. All these things can be worked 8 out as it goes through the process. And then 9 we move on. 10 And we then move on to the kinds 11 of issues that were raised by Ms. Rosenberg 12 and Mr. Griffon, which is that any regulation 13 will fail is there are not two things. 14 The first is that if unions are 15 weak, they cannot protect the workers in 16 those plants who have to be the people who 17 are the onsite inspectors. And if they have 18 to be the whistle blowers and if the unions 19 cannot protect them as whistle blowers, we 20 have no safety regime at all. 21 Because outside regulation can 22 only go so far. There have to be people

202-234-4433 Neal R. Gross and Co., Inc. Page 233 1 onsite who know the process and are working 2 with it. And they have to be protected. 3 Secondly, even if the regulators 4 are trained and paid well, and I'm all for 5 doing that, they will still be a revolving 6 door with the industry, as we've seen with 7 the banking industry and every other 8 regulation that's taken place in this 9 country, unless the political authority that 10 is behind these regulators is concerned first 11 with the needs of the people rather than the 12 needs of the corporation. 13 When Chevron controls the 14 Government through its campaign 15 contributions, its lobbying activities and 16 various other ways of buying community 17 support, it doesn't really matter if we have 18 good trained regulators. 19 We still will get the same thing. 20 Namely, we'll get Chevron doing what it wants 21 to do in the name of higher profits. 22 So it would be good if the report

202-234-4433 Neal R. Gross and Co., Inc. Page 234 1 would note that problem and put in there that 2 something has to be done about the 3 contributions and the political power that 4 Chevron and the oil industry have as a result 5 of their money. 6 Only then, only when the public 7 understands that that really is their safety, 8 that they elect people who are willing to 9 represent the people rather than the 10 corporations, can we really make these kinds 11 of operations safe. Thank you. 12 FEMALE PARTICIPANT: Bravo. 13 (Applause) 14 DR. HOROWITZ: Thank you, Mr. 15 Parker. And how about Tarnel Abbott, Mr. 16 Tarnel? Ms. Abbott? 17 MS. ABBOTT: Yes. That's Tarnel 18 Abbott, it's T-A-R-N-E-L A-B-B-O-T-T. Thank 19 you very much for -- 20 DR. HOROWITZ: And representing 21 the Richmond Progressive Alliance also, 22 ma'am?

202-234-4433 Neal R. Gross and Co., Inc. Page 235 1 MS. ABBOTT: Yes. 2 DR. HOROWITZ: Thank you. 3 MS. ABBOTT: But I'm also 4 representing myself as a citizen of this 5 city, resident, long-term resident. I do 6 want to thank the CSB for coming to Richmond 7 and spending a lot of time on this issue. 8 I was pretty close when the fire 9 happened. And I also sought medical 10 attention. But because I did not go to an 11 ER, I went the next day and saw my doctor, my 12 visit was not recorded or counted. 13 I'm probably not the only one. So 14 let me say that 15,000 people went to get 15 medical help, it's at least 15,000 and maybe 16 more. 17 The toxic load in Richmond is 18 severe. It's from the Richmond Refinery, 19 it's from the port, it's from other 20 industrial sources. The people in this 21 community have an over-burden, a health over- 22 burden, an overload.

202-234-4433 Neal R. Gross and Co., Inc. Page 236 1 I worked for 22 years at the 2 Richmond Public Library as a librarian. And 3 I lost so many colleagues to cancer that it's 4 absolutely heart breaking, young people. And 5 it's continuing. 6 I do think Chevron is partly to 7 blame for that. My son had asthma, and I can 8 tell you now that he moved away, he doesn't 9 have asthma anymore. 10 In terms of the trade secrets, 11 Chevron has used proprietary information to 12 basically not allow testimony in a public 13 courtroom. And so I would be very wary about 14 that. 15 In terms of enforcement, the prior 16 speaker, Mr. Parker, said it beautifully, 17 because Chevron spends so much money on the 18 local elections it's very hard for the local 19 body to be the objective regulator that they 20 need to be. 21 They need to do the regulations, 22 but somehow the real teeth have to be

202-234-4433 Neal R. Gross and Co., Inc. Page 237 1 separated from the corruption of the 2 democratic process that happens when 3 elections are bought. And they are bought. 4 It's utterly shocking and 5 disingenuous when industry expresses fear 6 that the Safety Case approach might even 7 create more risk. That is just the most 8 ludicrous thing I've heard. 9 As I see it, the Safety Case 10 approach is something that strives towards 11 prevention of accidents, and because it sends 12 up the inclusion of the workforce into the 13 recommendations. 14 And they are the ones on the front 15 line who do know what's needed. I think 16 these are very good recommendations, and I 17 urge you to adopt it. Thank you very much. 18 (Applause) 19 DR. HOROWITZ: Thank you very 20 much. And next we'll go to Jeff Kilbreth, 21 Richmond Progressive Alliance. Mr. Kilbreth? 22 MS. ABBOTT: He's gone.

202-234-4433 Neal R. Gross and Co., Inc. Page 238 1 DR. HOROWITZ: He's gone, okay. 2 And Roger Lin, well, this is a duplicate. 3 Did you have an additional comment or perhaps 4 you just signed up twice? 5 (Off microphone discussion) 6 DR. HOROWITZ: He left. Okay, 7 very good. And next is Martin MacKerel, 8 Sunflower Alliance, Mr. MacKerel? 9 MR. MACKEREL: Thank you. Yes, 10 it's Martin MacKerel, A-C, capital K-E-R-E- 11 L. 12 DR. HOROWITZ: Oh. 13 MR. MACKEREL: You can say it 14 either way, that's fine. 15 DR. HOROWITZ: Okay. 16 MR. MACKEREL: So, yes, I'm with 17 the Sunflower Alliance and 350 Bay Area 18 working on climate and environmental justice. 19 I did have one comment for the 20 gentleman from WSPA and API. Please stop 21 exploring for fossil fuels. We already have 22 five times the amount in service than we can

202-234-4433 Neal R. Gross and Co., Inc. Page 239 1 safely burn. Thank you. 2 So regarding the Safety Case 3 regime, so I mean, look at some of the stuff 4 that's happened lately. We have the 5 explosion a year and half ago. We've been 6 seeing these bomb trains with Bakken shale 7 oil, just can't stop exploding, back two the 8 last couple of weeks. 9 We have this just absolutely 10 ridiculous disaster in West Virginia. It's 11 clear that there's a lot of industry that's 12 just out of control and that, across the 13 board, regulation is inadequate. 14 And I really hope that this can be 15 part of a sea change of how society interacts 16 with industry and really make the case. We 17 need to absolutely change the way we look at 18 things and have safety first. 19 And I think there's, you know, 20 this idea that somehow the Safety Case regime 21 would be more dangerous, it's ludicrous. And 22 I think there's one thing in there, if I

202-234-4433 Neal R. Gross and Co., Inc. Page 240 1 understand it correctly, that I think I see 2 why the corporations really don't like it, 3 which is to say that if things are unsafe the 4 regulators have the power to stop production. 5 That's what -- am I incorrect on that? 6 FEMALE PARTICIPANT: That's true, 7 but they don't do it. 8 MR. MACKEREL: Of course they 9 don't do it. So we're going to have to push 10 them on that. But the power is there. 11 So, I mean, Chevron could just 12 brush off a million dollar fine. Stopping 13 production would actually hurt them, and 14 actually they would have to stop with the 15 rest of the issues. 16 But at any rate, I think, you 17 know, we're in a crazy time right now. We're 18 facing myriad really complex crises. And 19 it's a time where we need, we need unlikely 20 heroes. 21 And we have, for example, here in 22 the Bay Area, the Bay Area Air Quality

202-234-4433 Neal R. Gross and Co., Inc. Page 241 1 Management District, which is kind of an 2 oddball regulatory agency, has really stepped 3 up to the plate and been really far sighted 4 about helping to regulate greenhouse 5 emissions and have a plan for the future, 6 actually reducing them. 7 And so I hope that, on this front 8 of chemical, you know, regulation, that the 9 CSB can do a similar thing. Thank you very 10 much. 11 (Applause) 12 DR. HOROWITZ: Thank you, Mr. 13 MacKerel. Next we have Ethan Buckner of 14 Forest Ethics. Mr. Buckner? 15 MR. BUCKNER: Hi there. My name's 16 Ethan Buckner. It's E-T-H-A-N B-U-C-K-N-E-R. 17 I'm the U.S. organizer for Forest Ethics. 18 And first I'd like to thank the CSB staff for 19 your tireless work -- it may be tired at this 20 point -- 21 (Laughter) 22 MR. BUCKNER: -- to draft this

202-234-4433 Neal R. Gross and Co., Inc. Page 242 1 report, the interview today. And I strongly 2 urge the CSB to adopt this report. 3 And there are many reasons why 4 adopting a Safety Case regime is critical to 5 protect workers, and communities and 6 environments. And I'd like to highlight one 7 particular aspect of the CSB's 8 recommendations that's essential, especially 9 here in the Bay Area and across the United 10 States. 11 The need for regulatory regime is 12 adaptable and continuously improved. If 13 regulations cannot keep up with a rapidly 14 expanding and changing industry, cities like 15 Richmond, Pittsburgh, Venetia, Rodeo, 16 communities that all here in the Bay Area are 17 facing proposals for expanded infrastructure, 18 will be at much greater risk for repeats of 19 the August 12th fire or worse. 20 We need regulations that can 21 specifically address the rapid increase of 22 unconventional, dirty and dangerous crude oil

202-234-4433 Neal R. Gross and Co., Inc. Page 243 1 being brought here into the Bay Area, 2 including tar sands from Alberta, noting that 3 the (inaudible) has a significantly higher 4 sulphur content than traditionally applied 5 crude. And it's been identified that 6 sulfidation was a significant cause of 7 corrosion to the pipes in the 2012 fire, and 8 also oil coming from North Dakota's Bakken 9 fields which is highly volatile and 10 dangerous, as pointed out by a letter just 11 released this past week by the Department of 12 Transportation and evidenced by countless 13 derailments and explosions, notably the Lac- 14 Megantic explosion that leveled the small 15 town and killed 47 people. 16 It's an industry that's intent on 17 maximizing profit at the expense of community 18 and worker health and safety. And we need a 19 strong regulatory regime to counter that. 20 We can't afford a reactive 21 approach of refinery regulation if this 22 approach is demonstrably ineffective. We

202-234-4433 Neal R. Gross and Co., Inc. Page 244 1 cannot afford to wait for another disaster. 2 We must take bold action to protect the 3 health and safety of workers and communities. 4 So I urge the CSB to approve this 5 report. And I urge municipal and regional 6 decision making bodies, particularly the 7 Contra Costa County Board of Supervisors and 8 the Bay Area Air and Quality Management 9 District to withhold any permit, to withhold 10 any oil expansion permit until Safety Case 11 regime is effectively adopted and 12 implemented. Thank you very much for your 13 work. 14 (Applause) 15 DR. HOROWITZ: Thank you. And 16 next is Stephanie Harvey, I believe, 17 Communities for a Better Environment. Ms. 18 Harvey? Is Ms. Harvey here? 19 (Off microphone discussion) 20 DR. HOROWITZ: Okay. And then 21 we'll go to Katrina Ruk, Council of 22 Industries. Ms. Ruk?

202-234-4433 Neal R. Gross and Co., Inc. Page 245 1 MS. RUK: Yes. 2 DR. HOROWITZ: Is it Rok or Ruk? 3 MS. RUK: It's Ruk. 4 DR. HOROWITZ: Oh, okay. 5 MS. RUK: Ruk, sorry. And it's 6 Katrinka, K-A -- 7 DR. HOROWITZ: Katrinka, I'm 8 sorry. 9 MS. RUK: Yes. I have a letter 10 I'll give you. 11 DR. HOROWITZ: Okay. 12 MS. RUK: I want to say good 13 evening and -- 14 DR. HOROWITZ: Could you just 15 spell it for the -- 16 MS. RUK: K-A-T-R-I-N-K-A. 17 DR. HOROWITZ: R-U-K? 18 MS. RUK: R-U-K. 19 DR. HOROWITZ: All right, thank 20 you. 21 MS. RUK: I want to thank you for 22 having the opportunity to speak today. I am

202-234-4433 Neal R. Gross and Co., Inc. Page 246 1 Executive Director of the Council of 2 Industries. 3 We are based in Richmond, and 4 we're a trade organization that represents 5 members in the West County area, industrial 6 facilities and other businesses. I also live 7 in Richmond, for the past 25 years. 8 Calls for regulatory changes to 9 improve industrial safety are appropriate as 10 that scenario where continuous improvement is 11 always warranted. 12 However, it's important that 13 proposals for a change in the safety regime 14 are considered and applied at the appropriate 15 level of Government to ensure that we do not 16 make decisions in haste or simply for the 17 purpose of change. 18 It is not that the Safety Case is 19 wrong or inherently flawed as a regulatory 20 approach. But it does need to be applied to 21 a broad level of industrial facilities to 22 ensure the best outcome in improving

202-234-4433 Neal R. Gross and Co., Inc. Page 247 1 industrial safety. 2 The CSB's report addresses its 3 recommendations to the State of California 4 rather than local or regional jurisdictions, 5 since the complexities of this issue are best 6 suited to be assessed at the state and 7 federal level. 8 It is unnecessary for the city to 9 act on its own, given the role that the State 10 is playing. Indications are that Cal/OSHA is 11 already working with the CSB regarding these 12 recommendations, and both the city and Contra 13 Costa County should be considered as 14 important stakeholders in the State's 15 process. 16 For the city to take ownership of 17 the complexity and cost of such a regulatory 18 overhaul, and the ultimate administration of 19 the safety regime that is unique to the City 20 of Richmond, would result in additional 21 layers of regulation with no guaranteed 22 benefit.

202-234-4433 Neal R. Gross and Co., Inc. Page 248 1 This approach would also undermine 2 the focus the city has on implementing the 3 recommendations the CSB already made to 4 Richmond in Contra Costa County to revise the 5 Industrial Safety Ordinance. 6 Industrial safety is a complex and 7 serious issue. Clearly by the amount of time 8 you all have spent on this, it shows that it 9 needs to be managed at the appropriate level 10 of government. 11 The city does not currently have 12 the capability, and it would be complicated 13 for the city to develop the capability to 14 manage a safety program that is not aligned 15 and consistent with other Government safety 16 oversight programs. 17 The Council of Industry believes 18 the City of Richmond and Contra Costa County 19 should participate in the Cal/OSHA process to 20 consider the CSB's recommendation to adopt 21 the Safety Case rather than pursuing local 22 adoption. Thank you for allowing me time to

202-234-4433 Neal R. Gross and Co., Inc. Page 249 1 speak. 2 DR. HOROWITZ: Thank you, Ms. Ruk. 3 Next we go to Joseph Pillao (phonetic). Mr. 4 Pillao, are you here, sir? 5 MR. PILLAO: Joseph Pillao, I'm 6 speaking for myself. I live in Richmond. I 7 want to thank the CSB for all its hard work 8 and voluminous information. 9 The Safety Case requires a five 10 part process. And I believe a fatal flaw has 11 been demonstrated tonight. We've heard from 12 labor, we've heard from the community. Where 13 is the 800 pound gorilla? 14 Chevron representatives are in 15 this auditorium. They chose not, they chose 16 not, they have not the character to come 17 forward tonight and address the findings and 18 recommendations of your report. What we'll 19 get tomorrow is their usual pablum of 20 (inaudible). 21 And there's a second 22 problem, absence in this room. The CSB

202-234-4433 Neal R. Gross and Co., Inc. Page 250 1 report acknowledges that the solution to the 2 safety problem is essentially political. 3 Government at various levels will be required 4 to adopt and enforce new safety rules. This 5 will be very difficult and is demonstrated by 6 the absence. 7 In the audience tonight you don't 8 see Chevron's chief political apologists, 9 Councilman Nat Bates and Councilman Corky 10 Booze. And without the change in the 11 political regime, all of these 12 recommendations will, when suggested, go to a 13 committee where all the issues die. Thank 14 you. 15 (Applause) 16 DR. HOROWITZ: Thank you, Mr. 17 Pillao. Next we will go to Roberta 18 Sweckerman (phonetic) or Swickerman 19 (phonetic). Ms Sweckerman? Roberta 20 Sweckerman? 21 (No response) 22 All right. And how about Sylvia

202-234-4433 Neal R. Gross and Co., Inc. Page 251 1 Gray-White? Is there a Sylvia Gray-White. 2 MALE PARTICIPANT: She's here. 3 (Pause) 4 MS. WHITE: Good evening. My name 5 is Sylvia Gray-White. I'm a member of CBE 6 and the RPA. And I live in Richmond, 7 California. 8 I wanted to first thank 9 the Chemical Safety Board for developing a 10 much needed way to increase our safety. And 11 I'm in total agreement with moving forward 12 with this procedure. 13 What is the real cost of Chevron 14 to the City of Richmond, California? We've 15 all heard numerous reports about how over 16 15,000 people sought medical treatment after 17 the August 6th, 2012, fire. 18 But have you heard any reports 19 that over 15,000 people received proper and 20 adequate treatment? No, you didn't hear 21 that. Because it didn't happen. How can 22 they treat you if they don't know what

202-234-4433 Neal R. Gross and Co., Inc. Page 252 1 chemicals are in your body, even though the 2 law requires that all companies that cause 3 chemical emissions inform the medical 4 community what the chemicals are and the 5 possible health issues that may occur? 6 Chevron has not done this. Can 7 you make them do this? If you ask for a test 8 for chemical toxicity, your doctor will say 9 he doesn't know what to test for. And he 10 doesn't. 11 I had to go for treatment three 12 days after the fire. The air was just that 13 polluted. We had three Spare the Air dates 14 after the fire. 15 The medical staff at Doctors 16 Hospital took my blood pressure which was 17 much higher than usual, they told me to take 18 an Ibuprofen and a cough drop. That was it. 19 They had no idea, and I had no 20 idea what was in my body. Even the Bay Area 21 Air Management District wouldn't tell us what 22 is in our bodies. They only test the air one

202-234-4433 Neal R. Gross and Co., Inc. Page 253 1 day a week. Yet we breathe 24 hours a day, 2 seven days a week. 3 The day of the fire was not one of 4 the days that they monitored. They don't 5 even test for chemicals like benzine which 6 are emitted every day. My daughter has 7 Hodgkin's Lymphoma. The multiple safety data 8 sheet says specifically that benzine causes 9 Hodgkin's Lymphoma. 10 She recently had a successful bone 11 marrow transplant to get rid of the cancer. 12 She is still healing though, because of the 13 effect of seven straight days of chemotherapy 14 included in the bone marrow transplant 15 procedure. 16 This challenge has been a part of 17 her life and my life for the past eight 18 years, just from breathing the air before the 19 fire. Her illness developed before the 20 August 6th, 2012, fire. 21 I had to retire from my job 22 because of getting sick from breathing the

202-234-4433 Neal R. Gross and Co., Inc. Page 254 1 air in Richmond, before the fire also. I 2 have many friends and relatives who are also 3 suffering from the daily polluted air. 4 The current emission regulation 5 standards are not strict enough. Please 6 investigate this and remedy. There is no 7 adequate monitoring of the rules that are in 8 place. 9 It has also been reported that no 10 deaths occurred as a result of the fire. How 11 can you say that when there's no reference to 12 the chemicals emitted and no one is 13 monitoring them. 14 Before the fire, Richmond citizens 15 have been getting sick and dying. Richmond 16 is said to have the highest cancer rate in 17 California. 18 I found out last year that Chevron 19 has representatives on the Board of Directors 20 for both Doctors Hospital and Kaiser 21 Hospital. They should be working together to 22 reduce the physical challenges, but that is

202-234-4433 Neal R. Gross and Co., Inc. Page 255 1 not happening, because they don't want 2 Chevron's name to be implicated. 3 No one is being tested for heavy 4 metals emissions, not even employees of 5 Chevron. Testing of heavy metals should be 6 required for all refinery employees and 7 should be provided for all Richmond citizens. 8 Because even if the pipes inside are up to 9 standard, we still have to breathe the air 10 going in and coming out of the refinery. 11 I live way across town in East 12 Richmond Heights and took a heavy metals hair 13 analysis test last year which showed I have 14 lead, mercury and arsenic in my system in 15 spite of my daily detoxing, according to my 16 (inaudible) doctor. Reports with that, the 17 hair analysis test is good, because it does 18 record what is stored in your body cells. 19 I've lost over $100,000 because of 20 Chevron, because I couldn't get to work. I 21 get sick driving to work, stop by Kaiser 22 Emergency a couple of hours and then go to

202-234-4433 Neal R. Gross and Co., Inc. Page 256 1 work around noon. I had to retire. 2 How much is Chevron costing other 3 Richmond families? Richmond reportedly is 4 underemployed. I believe that Chevron 5 emissions play a major part in this. 6 Heavy metals exposure affects you 7 physically and mentally. If it happened to 8 me, it could happen to everybody else. 9 Chevron has violated our rights, 10 our civil rights. We are all entitled to 11 life, liberty and the pursuit of happiness. 12 Breathing air full of toxic chemicals has 13 drastically reduced our quality of life, even 14 in (inaudible). It's bound our liberty, 15 consequently, there is no happiness. 16 We have had 27 Spare the Air days 17 in the last few months. Citizens are 18 prohibited from burning anything in their 19 fireplaces on these days unless it is their 20 only source of heat. 21 Yet, during the same period, there 22 are no restrictions on Chevron. Smoke is

202-234-4433 Neal R. Gross and Co., Inc. Page 257 1 still polluting the air 24 hours a day, seven 2 days a week. Why? This has gone on far too 3 long and has hurt and destroyed so many, many 4 people. 5 We need drastic changes in 6 operation, monitoring and enforcement. I'll 7 say that again in case you didn't hear it. 8 We need drastic changes in operation, 9 monitoring and enforcement. 10 Thank you once again, though, for 11 your acknowledgment of how much our city has 12 suffered and seeking to restore our community 13 and our health. Thank you. 14 (Applause) 15 DR. HOROWITZ: Thank you. And 16 next is Claudia Citren. 17 MS. CITREN: I guess I'll be last 18 one, so thank you for bearing with Richmond. 19 And I'm Claudia Citren, C-I-T-R-E-N. I'm a 20 Richmond resident. 21 First of all, I'm glad that 22 someone of the committee thought of giving

202-234-4433 Neal R. Gross and Co., Inc. Page 258 1 you an award. You deserve it, not only for 2 bearing with us, but also for educating the 3 community. 4 And that's the point I wanted to 5 get to which was brought up earlier about 6 transparency. If you run against walls with 7 government, and if it's even difficult for 8 our Congresswoman, Ms. Miller, to establish 9 changes, continue what you're doing with the 10 community. 11 I hope you're impressed by the 12 sheer presence of non-profit agencies, I had 13 no idea. Continue involving social media. 14 Be transparent. 15 I did an experiment yesterday. I 16 called EPA, Clean Air Board, I called all of 17 the agencies who should know about Chevron by 18 now. And I asked can you tell me which 19 chemicals were released? 20 I have 25 phone numbers now. And 21 one of the executive secretaries, after I 22 told her that I would call the Governor's

202-234-4433 Neal R. Gross and Co., Inc. Page 259 1 office, which I did, got behind and she 2 called me back. And she said, yes, there's a 3 lot of documents out there. It's at the 4 bottom of a document. 5 If you manage to continue to 6 educate the community, if you manage to 7 continue to counsel the representatives of 8 Richmond in how to proceed, you're going to 9 have a lot of experts here. 10 And if you continue to work on 11 transparency, if you continue to fight for 12 what the Richmond residents want, what the 13 general public is by law allowed to know, we 14 can do what you can't do. And we will do 15 what you can't do. And I hope that makes 16 your work a lot easier. 17 Because, and I'll finish, because 18 we are in an age where corporations are 19 afraid of the general public. Because we can 20 do what you can't do. So keep involving us 21 and keep counseling. Thank you. 22 (Applause)

202-234-4433 Neal R. Gross and Co., Inc. Page 260 1 DR. HOROWITZ: Thank you, Ms. 2 Citren. And is there anyone here who did not 3 sign up who'd like to speak now? Just come 4 up to the mic if you haven't talked. Sir, 5 yes. Come up, sir. 6 MR. GREAVES: My name is Steve 7 Greaves. I'm a pre-school teacher here in 8 Richmond. I've taught for ten years here in 9 the city. 10 DR. HOROWITZ: Could you spell 11 your name, sir? 12 MR. GREAVES: G-R-E-A-V-E-S. 13 DR. HOROWITZ: Thank you. 14 MR. GREAVES: So I have about 45 15 students each year, half of them in the 16 morning and half in the afternoon. 17 And probably more than half of my 18 children, when they are absent, their parents 19 say it's because of asthma. And the children 20 were all born in this community. Four are in 21 a nearby community. 22 And I think that's a factor to

202-234-4433 Neal R. Gross and Co., Inc. Page 261 1 look at too in terms of the disproportionate 2 pollution that people have to suffer in this 3 community. Thank you. 4 DR. HOROWITZ: Thank you, Mr. 5 Greaves. 6 (Applause) 7 DR. HOROWITZ: Anyone else who 8 would like to speak who hasn't spoken? 9 (No response) 10 CHAIRPERSON MOURE-ERASO: I would 11 like to continue the agenda, but first we're 12 getting five minutes. So let's reconvene in 13 five minutes please. 14 (Whereupon, the foregoing matter 15 went off the record at 3:49 p.m. and went 16 back on the record at 3:53 .m.) 17 CHAIRPERSON MOURE-ERASO: Okay, 18 the next item on the agenda, and I think we 19 can do here, Ben (phonetic), please. Ben, 20 would you, here. 21 The next item of the agenda is 22 we're going to proceed with the vote on the

202-234-4433 Neal R. Gross and Co., Inc. Page 262 1 report. So to get to this voting, I would 2 like to start. 3 I move that the Chemical Safety 4 Board vote to approve the Report Number 5 2012031 California and the following 6 recommendations included therein. 7 The first recommendation is 8 2012031CAR21 that refers to the Safety Case. 9 The second recommendation is 20120311CAR22 10 that refers to indicators of safety. And the 11 third one is 2012031 California R23 that 12 refers to a recommendation to OSHA to 13 consider the Safety Case in their 14 deliberations on the Executive Order in 15 chemical safety. 16 So in order for to have discussion 17 on this, I need to have a second to this 18 move. 19 MEMBER ROSENBERG: I second. 20 CHAIRPERSON MOURE-ERASO: Okay, we 21 heard a second from Member Rosenberg. So do 22 we have any discussion?

202-234-4433 Neal R. Gross and Co., Inc. Page 263 1 MEMBER GRIFFON: Yes. I'd just 2 like to make a motion to postpone the vote on 3 this report until the CSB more fully 4 addresses some serious issues raised both in 5 the public comments submitted to the Agency 6 as well as the comments made tonight. 7 Specifically, this motion to 8 postpone directs the staff, through the 9 Chairman, to do the following. 10 The CSB staff shall be directed to 11 investigate and make recommendations with 12 respect to the effectiveness of oversight and 13 enforcement by the State of California and 14 the Contra Costa Health Services. 15 One, does Cal/OSHA have sufficient 16 authority to require timely abatement of 17 hazards associated with serious and willful 18 violations? 19 Two, should Contra Costa County 20 Health Services have direct enforcement 21 authority under the Industrial Safety 22 Ordinance?

202-234-4433 Neal R. Gross and Co., Inc. Page 264 1 Three, does Contra Costa County 2 Health Services have sufficient resources to 3 conduct comprehensive inspections and retain 4 technically qualified personnel? 5 Four, does Contra County Health 6 Services have sufficient authority to require 7 facilities to undertake feasible risk 8 reduction measures such as best practices 9 which go beyond minimum regulatory 10 requirements? 11 Two, the staff shall convene a 12 multi-disciplinary expert panel selected by 13 the full Board, similar to the Baker panel 14 established after the BP Texas City incident, 15 to provide the Agency with an assessment of 16 the following topics regarding regulatory 17 process safety in refineries in California. 18 One, to address questions raised 19 in the comments received by the CSB, the 20 panel shall assess the available process 21 safety performance data to evaluate the 22 effectiveness of the Safety Case regulatory

202-234-4433 Neal R. Gross and Co., Inc. Page 265 1 model for refineries. 2 Two, assess the challenges of 3 making Safety Case operational and effective 4 with regard to the following topics. A, what 5 is the role of transparency and community 6 involvement under this regime? 7 B, how are workers empowered as 8 part of the triparthied model? Have there 9 been retaliatory actions taken against 10 workers for their involvement and what 11 protective measures are in place? 12 C, are safety committees mandatory 13 or optional in non-union work places? How 14 are safety committee members selected and 15 under what authority? 16 D, is there a public database of 17 incident and near-miss reporting? How are 18 process safety performance indicators 19 developed and used? Are these made public? 20 E, how are standards for minimum 21 levels of risk set? ALARP goes into the 22 risks beyond minimum levels.

202-234-4433 Neal R. Gross and Co., Inc. Page 266 1 F, what are the enforcement 2 methods used by regulators under the Safety 3 Case? For example, what are the enforcement 4 tools beyond withdrawal of consent to 5 operate? 6 G, What are the key transition 7 issues that were addressed facilities in 8 operation at the time Safety Case was adopted 9 abroad in other regimes? 10 Finally, the panel shall be 11 established and complete its assessment 12 within 120 days. Such assessment shall be 13 considered by the CSB and incorporated in the 14 Chevron regulatory report as appropriate. 15 And that's my motion to postpone. 16 CHAIRPERSON MOURE-ERASO: But, you 17 know, there's a little problem here. We have 18 a motion on the floor that has been moved 19 appropriately and has been seconded. 20 MEMBER GRIFFON: Right. 21 CHAIRPERSON MOURE-ERASO: And what 22 you are saying is that we postpone the vote.

202-234-4433 Neal R. Gross and Co., Inc. Page 267 1 I mean, that doesn't, it's not directs on the 2 motion's on the floor that has been seconded? 3 MEMBER GRIFFON: It's a procedural 4 recommendation to postpone for a definite 5 period of time, according to Robert's Rules. 6 CHAIRPERSON MOURE-ERASO: Well, I 7 mean, how do you propose that the motion that 8 has been seconded be addressed, that either 9 you are approving it, or disapproving or how 10 are we going to do it. You know what I'm 11 saying? What we should do is to postpone 12 action on this. That is -- 13 MEMBER GRIFFON: That's right. 14 I'm sorry, could you say your opinion on the 15 record, General Counsel? 16 MR. LOEB: You have two competing 17 motions right now. You have the first 18 motion, it was the motion that you moved and 19 that was seconded by Member Rosenberg. You 20 can take a vote on that. 21 And then you have a second motion. 22 And the second motion, we haven't had a

202-234-4433 Neal R. Gross and Co., Inc. Page 268 1 second on that yet. So you have a second 2 motion. 3 MEMBER GRIFFON: The first 4 motion's the main motion, that's a procedural 5 motion. 6 MR. LOEB: There're two competing 7 motions here. 8 CHAIRPERSON MOURE-ERASO: Well, 9 you know, what do the Robert's Rules or Order 10 arguing here? What I would like to, let's 11 cut to the chase here. 12 We have a report that has been 13 presented with two or three specific 14 recommendations. There has been some 15 suggestions, we included your suggestions 16 here. But a lot of other things need to 17 happen for having a vote on the specific 18 issues of this investigation. 19 So what I would need to deal with 20 this is, since this is the second part of a 21 three part report, what I propose is that we 22 vote this second recommendations of this

202-234-4433 Neal R. Gross and Co., Inc. Page 269 1 report as we have here. 2 And other recommendations that you 3 are making here to do additional 4 considerations, we consider in the third 5 report. And we evaluate it the way that you 6 want to evaluate it in the third report. 7 Because it seems to me that what 8 we have here in front of us is the results of 9 the specific investigation with non-specific 10 results with three recommendations. 11 So if anything additional has to 12 be considered, you have up here three pages 13 of additional considerations that you want to 14 happen. 15 Why don't we postpone that, as you 16 suggest, to be considered in the third report 17 that will be the final report of Chevron, 18 with that for consideration. 19 MEMBER GRIFFON: You know, for the 20 recommendations to Contra Costa and those 21 other regulatory recommendations that may 22 have some merit. But, I mean, the second

202-234-4433 Neal R. Gross and Co., Inc. Page 270 1 whole part of that is for further information 2 to consider Safety Case. 3 There are questions on the Safety 4 Case. And to move this report forward, with 5 outstanding questions out there, I think, I 6 just want to, I think Jim Rogers put it 7 right. I want to be in a place where we can 8 all come to agreement on this and get behind 9 the report. 10 And I think a little more work may 11 be not insignificant. But more work and a 12 more balanced report will get us there. 13 CHAIRPERSON MOURE-ERASO: Well, if 14 you feel so strongly about the difficulties 15 with the report as it's written, you have the 16 choice of voting no, you know. And then we 17 can come to a head. 18 But, you know, you are proposing 19 three pages of additional work that is going 20 to go to the staff, personally, to be 21 considered in this investigation. That is a 22 list of things that could perfectly be

202-234-4433 Neal R. Gross and Co., Inc. Page 271 1 addressed on the third report that is not 2 finished. 3 It seems to me that, I don't see 4 any reason that if you feel like you cannot 5 agree on what we are saying in this report 6 and these recommendations here, if you vote 7 no, I don't know what the other vote is going 8 to be. And then move again into a proposal 9 to consider the third report. 10 MEMBER GRIFFON: I mean, I don't 11 want to get into the Robert's Rules too much 12 either. But the motion to postpone does take 13 precedence. And that should be, once that's 14 on the table, if it's seconded, once that's 15 on the table that's what's discussed. 16 But, you know, I think that the 17 idea here is, I don't want to be in a 18 position to vote no. I want to be in a 19 position to vote to postpone for a definite 20 time to address these specific things where I 21 can come forward and be in a position for all 22 of us to vote yes.

202-234-4433 Neal R. Gross and Co., Inc. Page 272 1 CHAIRPERSON MOURE-ERASO: But you 2 are proposing this as an amendment to the 3 motion that I made? 4 MEMBER GRIFFON: It's not an 5 amendment. It's a procedural motion. 6 (Off microphone discussion) 7 CHAIRPERSON MOURE-ERASO: Yes. 8 But, I mean, do I have to accept the 9 procedural motion that he's proposing? 10 (Off microphone discussion) 11 CHAIRPERSON MOURE-ERASO: Well, do 12 you have a second? 13 MEMBER GRIFFON: I can't second my 14 own motion. But -- 15 MEMBER ROSENBERG: I second the 16 motion. 17 CHAIRPERSON MOURE-ERASO: Okay, so 18 we have a second. Okay, so we are going to 19 work within the procedures of the change that 20 you have recommended. 21 MEMBER GRIFFON: That's a, hold 22 on, a procedural motion that's seconded

202-234-4433 Neal R. Gross and Co., Inc. Page 273 1 (inaudible)? 2 MEMBER ROSENBERG: Yes. 3 CHAIRPERSON MOURE-ERASO: Okay, so 4 we vote the procedural motion first. Could 5 you please conduct the vote? 6 MR. LOEB: The vote is on 7 procedure. Just to be clear, there is a 8 motion on the floor made by the Chairman a 9 moment ago to adopt the report and three 10 recommendations. That was seconded by Member 11 Rosenberg. 12 There is a second motion. the 13 motion is a motion to postpone the first one. 14 That was also seconded by Ms. Rosenberg. So 15 the first vote will be on the motion to 16 postpone as read by Member Griffon. So we 17 should proceed with that. Member Griffon? 18 MEMBER GRIFFON: Aye. 19 MR. LOEB: Member Rosenberg? 20 MEMBER ROSENBERG: Aye. 21 MR. LOEB: Mr. Chairman? 22 CHAIRPERSON MOURE-ERASO: No.

202-234-4433 Neal R. Gross and Co., Inc. Page 274 1 MR. LOEB: The motion to postpone 2 has the vote. And that motion passes. 3 CHAIRPERSON MOURE-ERASO: So that 4 negates the vote, the motion that I made 5 first? 6 MR. LOEB: The second motion, 7 which was seconded, both motions were 8 seconded. But the second motion preempts the 9 first motion. 10 MEMBER ROSENBERG: The goal is to 11 make the report stronger. That's the goal, 12 in short order. 13 (Off microphone discussion) 14 CHAIRPERSON MOURE-ERASO: Okay, so 15 thank you to the Board members for their 16 involvement and their work. And I think you 17 have, if there is no more motions to 18 consider, I declare this meeting adjourned. 19 (Whereupon, the meeting in the 20 above-entitled matter was concluded at 4:07 21 a.m.) 22

202-234-4433 Neal R. Gross and Co., Inc. 202-234-4433 Neal R. Gross and Co., Inc. Page 275 A $1 39:14 116:20 $1.2 45:14 52:1 209:12 $100,000 255:19 $2 117:6 $5.5 161:19 A-B-B-O-T-T 234:18 A-C 238:10 A&M 6:9 a.m 274:21 abate 230:4 abatement 17:2,11 17:22 41:13 42:1 42:8,13,17,21 47:15 58:18 110:4 192:11 202:19 263:16 Abbott 234:15,16 234:17,18 235:1,3 237:22 ability 42:16 83:19 86:8 103:17 174:16 206:6 230:4,6 able 4:21 73:15 80:20,22 154:21 180:12 199:11 230:4,7 above-entitled 274:20 abroad 24:16 266:9 absence 249:22 250:6 absent 260:18 absolutely 30:7 118:2 236:4 239:9 239:17 abundantly 131:2 academic 113:9 ACCE 226:2 accelerated 166:6 accept 72:3 75:19 79:20 80:1 151:9 154:7 162:19 212:3 272:8 acceptable 41:1 74:2 180:16 189:10 219:20 acceptance 83:6 145:10 174:5 accepted 23:17 145:12 178:5 accepting 72:15 access 122:21 accident 37:14 63:2 70:15 72:11 83:15 87:9,14 88:2,10 91:22 135:8,11 139:2,5 150:17 216:19 218:16 accidental 44:18 51:13 52:7 115:6 142:11 accidents 8:5,9,16 11:3 14:2 37:4,20 38:1 48:18 50:4 53:15 69:8 70:10 71:13 73:20 83:22 84:13 88:20 114:7 135:14,15 136:20 137:2,7,16,21 178:7,22 179:2 206:22 214:1,6,16 237:11 accompanying 84:15 accomplish 171:11 accomplished 51:2 accord 206:11 account 8:4 accountability 78:7 126:9 141:4 accountable 28:1 161:11 199:17 204:3 accurately 81:14 205:10 achievable 113:21 achieve 54:19 76:13 172:11 173:4 188:2 achieved 20:11 121:17 219:5 229:10 acid 161:13 acknowledge 130:2 139:2 147:1 acknowledges 144:11 250:1 acknowledgment 146:9 205:21 257:11 act 114:13 148:9 247:9 acting 122:7 action 7:1 44:12 52:16 113:2 117:3 117:15 127:15 130:14 151:2 160:5 164:1 168:6 171:21 188:22 201:14 205:5 219:7 230:22 244:2 267:12 actionable 87:11 224:15 actions 44:12 45:3 51:7 68:3 78:9 116:15 137:4 199:20 201:2 230:8 265:9 active 77:10,16 140:8 actively 87:6 103:17 172:14,19 172:21 activist 14:10 activities 84:6 85:5 97:17 233:15 activity 69:2 81:16 180:2 actual 94:7 105:21 197:2 adapt 69:15 83:19 adaptability 76:18 143:22 adaptable 242:12 add 42:6 143:1 152:8 171:21 175:16 added 45:11 47:18 172:2 adding 183:2 addition 3:16 70:13 74:3 120:15 additional 51:18 52:14 54:14 106:19 115:19 122:12 137:9 171:12 172:12 220:8 238:3 247:20 269:3,11 269:13 270:19 Additionally 25:18 116:13 121:7 146:19 address 2:5 25:5 26:6 53:8,14,18 70:11 71:3 85:15 96:19 102:5,12 108:15 120:2 136:6 188:1 194:5 201:21 242:21 249:17 264:18 271:20 addressed 51:10 68:9 73:6 102:19 104:2 137:2 266:7 267:8 271:1 addresses 247:2 263:4 addressing 24:17 53:20 136:10 197:5 217:16 adds 217:16 adequate 16:17 46:7 58:4 154:14 194:1,16 195:14 206:16 228:13 251:20 254:7 adequately 18:10 23:11 73:15 218:21 adjourned 274:18 administration 88:15 132:6 247:18 administrative 150:12 admits 215:20 adopt 21:11 39:3 47:2 53:4 64:12 130:6 164:19 169:1 187:3 202:18 211:4 223:6 225:19 228:5 229:15 237:17 242:2 248:20 250:4 273:9 adopted 42:15 47:18 57:19 135:4 135:6,9 157:15 158:12 159:6,12 159:15 227:13 244:11 266:8 adopting 10:18 182:4 242:4 adoption 49:18 75:1 77:1 122:10 146:21 164:3 230:13 232:3 248:22 advancement 69:16 advances 83:21 advantages 88:17 176:9 183:1 advent 178:18 adversely 41:22 advertising 199:7 advice 224:3 advised 40:14 43:9 advisor 141:21 advisory 164:12 advocacy 106:3 190:13 advocate 23:1 227:21 advocating 146:13 aeronautics 216:16 affect 71:20 103:17 afford 33:12 232:2 243:20 244:1

202-234-4433 Neal R. Gross and Co., Inc. Page 276 afraid 259:19 aftermath 13:18 112:22 afternoon 55:3 260:16 age 19:10 226:17 259:18 agencies 53:17 70:2 113:6 114:17 115:21 116:2 118:21 122:13 125:12 140:10 143:20 154:2 155:5,19 168:7 186:20 206:17 228:20 230:7 258:12,17 agency 14:17 23:11 39:17 90:21 106:1 112:10 117:9 156:6 193:8,14 194:19 206:10 219:22 241:2 263:5 264:15 agenda 4:21,21 5:1 26:4 62:2 261:11 261:18,21 aggressive 28:22 195:15 aging 19:16 167:14 ago 15:13 57:11 152:14 196:15 239:5 273:9 agree 22:19 121:22 170:19 184:12 187:14 191:10 195:18 202:6 206:5 271:5 agreed 12:7 117:6 167:14 225:12 agreement 117:3 251:11 270:8 agreements 104:17 ahead 32:10 111:14 120:19 152:3 208:3,5 211:8 ain't 162:17 163:2 air 3:6 27:15 35:1 48:21,22 115:1 116:2 148:9 150:22 155:7 227:21 240:22 244:8 252:12,13 252:21,22 253:18 254:1,3 255:9 256:12,16 257:1 258:16 airplane 212:21 alarm 150:14 alarms 150:18 151:2 ALARP 75:11 76:5 76:7,10,14 80:5 83:1 121:13 178:2 265:21 Alberta 243:2 alerts 115:11 Alice 111:15 112:6 aligned 248:14 alike 216:6 all's 31:20 Alliance 187:13 198:6 204:10,13 204:16,20,20 207:13 231:7 234:21 237:21 238:8,17 allocate 220:6 allocated 45:14 allocation 88:5 allow 16:16 40:5 77:2 159:2,16 224:3 236:12 allowed 39:11 67:4 68:17 198:13 259:13 allowing 134:4 137:22 248:22 allows 76:19 79:11 187:17 alter 197:19 alternative 21:22 37:2 63:15 73:22 171:4 alternatives 145:4 Amanda 1:19 2:10 63:8 74:12 82:3 173:9 ambiguity 99:4 amend 119:8 amendment 148:9 272:2,5 amendments 49:14 49:16 164:5,20 211:6 American 6:11,18 6:20,21 8:16 22:7 141:17,21 170:18 amount 5:21 238:22 248:7 Amounting 14:16 amounts 34:22 AMY 1:19 Anacortes 66:13 analyses 71:12 180:7 194:6 analysis 43:22 69:10 71:1 72:4 82:19 83:12 85:7 85:22 86:13 96:4 101:6,7 114:13 119:10,12 121:20 134:21 180:14 205:6 218:8 255:13,17 analyze 22:9 53:2 79:12 87:15 analyzed 60:20 109:10 146:17 analyzes 86:22 Andres 207:11 212:15 Andrew 74:15 174:7 Andy 227:16,19 anecdotal 216:7 Angeles 138:13 140:1 193:11 anger 214:7 Ann 138:4,7 annotated 9:11 annual 87:16 130:6 193:19 annually 87:20 135:8 answer 127:3 130:4 163:17 165:18 168:17 175:2 232:7 answering 126:5 answers 126:13 anticipation 114:3 anybody 154:19 anymore 236:9 anyway 32:10 APEN 152:7 185:11,13,19 187:1 API 141:22 142:3,5 142:9,13,16 143:13 144:7 146:10,14,19 170:21 208:2 238:20 API's 144:19 apologists 250:8 apologize 151:16 appeal 17:5,11 41:6 41:13 42:18 167:5 225:12 appealed 41:6 194:19 appealing 12:16 25:1 191:10 appeals 41:20 appear 7:13 appears 20:4 applaud 11:11 applauds 142:9 Applause 18:17 26:2,12 30:15 32:22 34:5 36:7 48:1 55:1 61:22 89:16 141:15 147:9 152:21 163:7 169:3 184:2 187:9 198:3 201:5 204:7 207:9 212:1 212:14 221:21 223:11 225:22 227:14 231:4 234:13 237:18 241:11 244:14 250:15 257:14 259:22 261:6 applicability 22:21 applications 10:10 132:16 applied 10:15 75:14 143:19 243:4 246:14,20 applies 175:17 apply 175:19 applying 121:8 144:19 appreciate 11:7 49:2 55:6 61:11 61:12 125:18 132:9 138:2 164:22 165:1 173:8,10 191:22 213:6,13 220:1 appreciated 112:19 230:15 appreciates 141:22 appreciation 124:8 230:18 approach 10:5 11:14 22:22 23:4 23:21 24:8,16 29:1,22 30:1 68:11 73:20 74:4 77:16 83:11 132:10,21 140:3 140:16 141:7 142:15 143:11 144:9,14 145:9,13 171:18 172:9 191:10,16 192:7 195:15 203:1,2 216:1 219:12 221:10 237:6,10 243:21,22 246:20 248:1 approaches 23:9

202-234-4433 Neal R. Gross and Co., Inc. Page 277 74:7,8 120:16 191:7 215:17 217:10,13,21 appropriate 17:1 46:4 52:14 88:5 93:10 122:20,20 154:21 164:19 214:19 246:9,14 248:9 266:14 appropriately 266:19 approval 7:11 approve 216:11 244:4 262:4 approved 73:8 158:10 200:3 approving 267:9 approximately 116:17 177:12 April 11:16 19:6 ARCO 179:3 area 27:9 48:22 68:1 108:10 114:20,22 115:2 116:11 138:13 148:13 155:7 167:20 168:4 201:14 205:6 210:12,19 216:14 216:19 238:17 240:22,22 242:9 242:16 243:1 244:8 246:5 252:20 areas 27:3,3 33:13 50:18 93:11 114:16 129:6 143:12 173:7 argue 23:5 arguing 268:10 argument 159:8 163:18 165:10 arguments 159:14 215:4 226:20 arising 78:11 215:1 Arizona 170:5 arsenic 255:14 Asian 151:18 185:5 185:10 asked 5:18 15:13 25:15 258:18 asking 53:6 107:7 231:14 asks 148:14 174:5 aspect 154:7,13 242:7 aspects 12:16,19 142:4 Assembly 17:14 41:16 assess 42:8 43:8 46:3 120:2 130:9 154:22 264:20 265:2 assessed 37:14 39:14 40:22 44:22 247:6 assessing 130:6 assessment 25:7 72:4 79:17 135:1 149:6 172:18 192:2 212:17 264:15 266:11,12 assessments 78:22 121:1 149:10 assignment 111:8 assist 54:6 224:21 associated 159:4 171:16 263:17 association 7:1 98:10 169:16,22 169:22 assume 195:10 assumed 180:16 assure 45:12 49:6 51:19 117:14 118:20 121:20 127:1 assuring 118:17 172:14 asthma 28:3 35:2 160:2 209:3 236:7 236:9 260:19 astronautics 216:16 Atomic 190:16 attempt 73:11 attempting 95:9 attending 48:7 62:22 208:10 attention 18:15 56:10,12,14 65:10 112:18 126:21 132:9 133:11 147:8 231:13 235:10 attitude 180:13 attorney 16:20 44:10 51:6 117:1 117:2 161:7,9 223:17 attract 46:7 86:9 attributes 25:2 audience 147:12,12 151:15 250:7 audio 1:22 audit 107:19 auditorium 249:15 audits 83:7 85:8 193:19 August 19:3 28:7 32:3 34:17 38:17 43:6 48:13 53:22 54:13 57:16 60:13 62:8 64:15 112:22 115:18 116:22 117:4 135:11,20 136:20 166:7 189:3 203:9 204:4 228:12 242:19 251:17 253:20 auspices 105:22 Australia 10:9 82:14 97:2,14 101:21 104:22 132:12 175:10 Australian 174:8 author 57:11 authority 16:19 17:22 23:16 44:7 44:17,21 45:2 46:10 51:4,12,15 51:17 58:20 70:10 72:3 85:12 102:4 102:6,8 130:8 148:8 155:17 161:8 162:12 194:5,8 202:15 229:14 233:9 263:16,21 264:6 265:15 authorize 52:19 authorizes 79:19 authorizing 46:22 53:3 autoimmune 209:4 available 13:20 64:2 78:13,19 95:15 119:14 148:7,18 217:13 218:11 264:20 avenue 143:16 average 135:7 Avon 66:7 awakened 200:17 award 258:1 aware 3:15 19:20 57:21 71:15 106:10 109:5 139:11 220:20 Aximaps 108:9 Aye 273:18,20 B B 83:2 87:15 265:7 B-A-T-E-S-O-N 190:11 B-J 169:14 B-R-E-S-L-A-N-D 213:9 B-U-C-K-N-E-R 241:16 back 36:19 47:5 57:22 61:14 101:8 151:14 158:22 178:8 189:22 210:8 239:7 259:2 261:16 Bailey 201:7,9,12 204:9 bailiwick 210:15 Baker 13:17 123:22 216:22 264:13 Bakken 210:11 239:6 243:8 balanced 13:6 270:12 balances 13:3 bankers 165:5 banking 233:7 bar 46:11 Baram 22:11 Barbara 2:6 36:10 bare 20:11 bargaining 104:16 barge 43:1 222:17 barrier 45:22 52:9 barriers 37:15 base 220:14 based 68:11 69:2,3 82:11 84:15 106:14,18 107:4 120:16 130:10 157:18 179:7,17 246:3 basically 31:7 125:12 157:19 224:14 236:12 basis 149:10 155:10 157:6 164:18 175:12 Bates 250:9 Bateson 190:4,5,9 190:10 198:2 Bay 27:3,8 48:22 116:11 155:7 167:20 168:4 201:14 205:5 210:12,19 227:20 238:17 240:22,22 242:9,16 243:1 244:8 252:20 Beach 139:20 bear 133:22 165:6 bearing 257:18

202-234-4433 Neal R. Gross and Co., Inc. Page 278 258:2 beautiful 33:8 beautifully 236:16 Beckles 2:6 31:3 33:3,5,9 34:7 36:9 229:21 bed 10:20 beef 181:13 beefed 181:16 begs 40:20 behalf 36:5,6 106:3 123:20 belief 137:12 218:18 believe 7:16 11:6 19:8 24:8 25:1,3 47:6 50:13,20 58:19 63:22 91:5 93:9 99:10 100:10 102:21 109:8 130:19 135:15 137:1,2,3 138:19 148:10 155:14 158:8 172:10 173:3 174:13 184:4 204:10 220:10 244:16 249:10 256:4 believes 142:16 171:6 218:10 220:4 248:17 belongs 141:8 Ben 261:19,19 bench 86:13 benchmarks 195:2 benefit 143:3 145:22 171:22 181:12 208:10 219:19 220:15 247:22 benefits 18:5 172:12 216:4 220:18 benzine 253:5,8 best 23:17 43:3 44:13 47:2 53:5 68:9 75:1 76:11 76:13,14 131:12 191:19 198:20 202:19 212:7 246:22 247:5 264:8 Beth 1:13 2:3 4:4 better 15:1 20:4 32:7,20 49:20 58:3,8 73:20 119:15 136:19 144:9 146:15 163:10,14 171:13 171:19 172:11 173:3 176:8 207:11 221:10 223:17 244:17 beyond 20:11 28:20 46:17 52:19 76:20 85:5 94:15 134:13 264:9 265:22 266:4 Bhopal 148:9 big 20:22 34:17 36:3,3,3 158:5 167:14 168:22 225:17 bigger 225:17 bill 17:15 41:17 42:4 124:10 binding 100:6 biochemical 11:3 bipartisan 93:17 bird-dogging 56:3 bit 34:2 96:11 118:10 Bjerke 169:5,10,13 169:14 black 28:19 blame 236:7 bless 70:14 blessing 96:7 block 42:17 blocked 41:9 blocks 139:16 blood 252:16 blowdown 150:21 blowers 232:18,19 blown 34:18 BlueGreen 187:12 204:10,12,16,20 204:20 board 1:1,10,12,13 1:14,22 2:2,14,19 3:20 4:1,4,6,7,7 4:10 7:11 9:22 11:6,20 12:6 18:9 18:19 26:21 32:7 35:3,9,20 36:4 48:11,22 49:2,16 54:12 59:13 60:2 63:22 64:8,11 69:18 82:4 89:13 89:19,21 102:16 111:21 112:6 117:12 118:3,19 125:19,21 132:17 134:3 135:22 136:8,18 152:5,9 153:4 170:15 177:5 187:3 201:11 202:3 207:16 212:18 213:10,11 214:4 222:8 223:16 226:4 227:18 230:15 239:13 244:7 251:9 254:19 258:16 262:4 264:13 274:15 Board's 132:9 169:20 222:22 225:2 228:4 bodies 58:8,9 145:1 244:6 252:22 body 236:19 252:1 252:20 255:18 bold 244:2 bomb 56:16 167:16 239:6 bone 253:10,14 book 160:8 books 158:19 Booze 250:10 born 260:20 Boston 22:11 bottom 121:3 156:12 162:14 259:4 bought 237:3,3 bound 256:14 box 81:16 180:2 207:2 BP 9:2 13:18 66:9 100:20 150:20 264:14 Bravo 234:12 breaking 37:1 236:4 breathe 227:22 253:1 255:9 breathing 28:11 253:18,22 256:12 Bresland 212:16,18 212:22 213:4,9 222:2 brief 90:2 166:13 briefly 53:8 127:12 202:1 bring 36:14 44:11 45:2 51:7 127:4 bringing 59:3 61:14 210:11 brings 100:5 broad 246:21 broader 26:1 94:12 95:2 105:4 109:19 110:13 Brody 187:11 broke 43:6 broken 168:2 224:1 brothers 186:4 brought 17:3 96:16 213:5 222:17 230:21 243:1 258:5 Brown 53:10 125:7 125:13 130:8 brunt 165:6 brush 240:12 buck 156:12 Buckner 241:13,14 241:15,16,22 bud 159:10 budget 45:13 52:2 130:9 195:9 build 54:12 161:21 222:16 building 3:13 built 149:22 bunch 105:10 burden 29:18 118:14,17,20 141:8 235:22 burdens 171:15 218:22 burdensome 73:14 burn 239:1 burned 64:19 burning 28:10 256:18 burst 166:6 Busching 111:16 business 13:2 97:7 100:17 101:4 117:13 139:15 178:20 businesses 246:6 busted 225:8 buying 233:16 C C 1:17 3:1 83:7 87:19 265:12 C-H-I-T-T-I-M 141:20 C-I-T-R-E-N 257:19 C-O-N-T-E-N-T-S 2:1 Cal/ALARP 119:9 Cal/EPA 115:17 117:22 Cal/OSHA 24:7 38:9 39:14 40:9 40:12 41:5,21 115:4 116:18 124:21 125:4

202-234-4433 Neal R. Gross and Co., Inc. Page 279 127:20 130:5,9 181:22 191:21 193:18 194:3 195:3 197:11 230:3,4 247:10 248:19 263:15 Cal/OSHA's 39:16 134:15 193:14 206:6 Cal/OSHAS's 73:10 CalARP 45:17 51:14,17 69:4 California 6:6,6 7:1 7:22 9:18 10:1,20 11:12,15 12:20 20:7 22:18 24:3 24:11,19 25:8,11 27:4,8 35:11 41:3 41:11 44:18 47:15 48:21 50:5 51:13 52:6 54:3 63:14 65:17 66:9 67:7 68:8,16,22 69:14 70:7,18 71:11 72:2,19 73:3,8 77:2 78:4,5 81:7 82:7,8,11 86:15 86:17,18,21 88:11 111:17 112:9,11 113:2 115:5 116:12 117:1,15 118:7 122:11 123:20 124:5,9,11 124:13 125:17 127:7,18 129:15 129:20 130:5,19 132:16 133:1 134:14 138:11 142:14 148:4,19 157:17 164:13 168:19 170:4,8 171:2 174:22 175:6 183:21 185:17 188:7 189:2 192:9 193:6 193:10,17 194:9 196:3 197:16 203:8,13 204:19 205:21 211:18 213:15 219:11 220:2,6 221:16 227:22 247:3 251:7,14 254:17 262:5,11 263:13 264:17 California's 124:18 124:22 215:18 call 11:19 32:7,11 32:20 99:1 107:19 194:10 230:22 258:22 called 9:8 38:22 105:6 142:7 258:16,16 259:2 calling 21:9 99:6 132:9 calls 9:16 214:18 231:22,22 246:8 cameras 160:1 Camo 152:5 campaign 233:14 cancer 160:3 236:3 253:11 254:16 cancers 209:3 cap 159:1 capability 248:12 248:13 capacity 130:16 230:21 capital 238:10 capitals 209:17 carbon 77:5 care 56:4 198:18 career 213:20 careful 112:18 217:12 carefully 9:21 47:10 63:19 81:19 carried 146:17 carry 13:2 45:15 carrying 40:16 cartel 210:9 case 10:6,7,11,15 10:19 12:17,20 13:1,5,8,13,21 14:2,5,6,13,16 15:4,6,9 16:2,5 18:5,11 21:22 22:16,21 23:3,14 24:8,16,22 25:17 29:12 30:7,13,22 35:16 37:2,12,20 38:2 40:21 42:14 43:17 46:10 47:7 49:21 54:2 56:6 57:6 59:15 60:1 60:11 61:3,18 63:15 73:18 74:3 74:13,16,17,19 75:4,8,9,12,16,19 75:22 76:9,18 77:1,10,11 78:15 78:16,18 79:5,11 79:17,19,20 80:2 80:4,9,13,19 81:5 81:6,9,12,15,18 82:12,17 83:3,9 85:6,22 86:8 88:17 89:5,6 93:9 93:18 95:10 96:21 97:6,9,18,20,22 98:8,18 99:3,8,18 99:20,22 100:3,4 101:17 102:10,11 103:2,8 104:3 120:18 121:11 122:3,8,10,18 132:10,15,21 133:18 135:17 137:10 140:3,10 141:7 142:15 143:1 144:9,13,19 144:21 145:9,11 145:13,17 146:1,6 146:21 148:22 149:10 150:20 151:8 153:14 154:16 157:3 164:9 167:7 171:5 171:19 172:12 174:3,14 175:17 177:18,22 180:22 181:7,10,10 182:4 182:18 183:2,5 187:2,16 191:10 191:15 192:7 200:8,13,14,15,18 201:18 202:5,8 211:10 213:16 215:12,15 216:1 217:4,9,14,17,19 218:4,12 219:4,5 219:11,16 220:3,5 220:16 221:11,17 223:1,3,6 224:5 224:10 229:4,7 237:6,9 239:2,16 239:20 242:4 244:10 246:18 248:21 249:9 257:7 262:8,13 264:22 265:3 266:3,8 270:2,4 Case-like 74:7 cases 15:11,15,16 95:20 97:1,4 151:10 218:15,18 catastrophic 10:22 39:8 74:1 88:19 126:19 214:6 category 39:18 causal 67:3 68:7 107:17 108:8 causation 108:1 cause 11:8 38:17 108:9 119:10,12 134:21 228:16 243:6 252:2 caused 39:8 causes 11:2 71:18 119:15,16 191:5 207:20 215:9 253:8 causing 65:9 CBE 163:14,22 166:7,21 223:13 251:5 CBI 100:22 cells 255:18 Center 6:9,17 161:21 central 119:19 certain 193:3 215:8 certainly 36:5 58:21 59:16 93:8 93:13 94:6 104:18 104:20 108:1,11 109:22 110:1,12 110:19 181:11 188:13 191:22 cetera 57:8,8 93:1 Chair 5:4 111:21 112:6 191:1 207:15 Chairman 18:21 36:17 48:9 62:21 111:8 118:3 123:18 134:2 177:5 184:8 201:10 263:9 273:8,21 chairperson 1:11 2:3 3:3,22 18:18 26:3 33:1 36:8 48:2 55:4 61:20 62:1 89:14,17 102:16 106:7 111:1 117:18 133:12 138:1 141:13 152:19 212:2,6 213:10 224:12 261:10,17 262:20 266:16,21 267:6 268:8 270:13 272:1,7,11 272:17 273:3,22 274:3,14 challenge 124:1 209:18,20 253:16 challenges 24:18 25:7 130:3,4 254:22 265:2 change 23:18,19 64:14 85:7 105:7

202-234-4433 Neal R. Gross and Co., Inc. Page 280 120:9,10 176:5 180:6 181:20 188:19 189:3 195:8 205:17 214:21 218:9 219:1 224:14 230:21 231:11 239:15,17 246:13 246:17 250:10 272:19 changed 131:4 214:6 changes 9:17 38:13 53:19 57:17 61:9 63:20 70:3 76:2 115:3 120:10 125:14 132:8,19 136:6,9,12 137:9 144:1 168:10 171:7 179:22 181:19 184:13 193:3 200:14 209:8,9 214:15,18 246:8 257:5,8 258:9 changing 143:1 171:18 242:14 Channelview 179:4 character 249:16 charged 55:15 124:17 125:13 164:14 charges 161:17,21 162:6 Charleston 3:6 21:9 Charlotte 187:11 charts 189:14 chase 268:11 check 81:16 180:2 checking 207:2 checks 13:3 chemical 1:1,10,12 1:12,14,22 3:22 4:7,9 6:18,19,22 11:4 35:3 36:4 48:11 54:11 69:18 80:15 88:13,19 94:14,18 117:12 125:19 132:2 134:9 135:21 136:8 148:5,7,10 148:15,17 153:4 160:18 161:13,18 169:19 170:14 173:22 177:15 179:3 190:16 193:16 197:15,18 213:11 221:4,6 222:22 228:3 230:14 241:8 251:9 252:3,8 262:3,15 chemicals 35:1 252:1,4 253:5 254:12 256:12 258:19 chemotherapy 253:13 Cheung 2:7 48:4,5 55:2,6 Chevron 1:3 6:8 12:1 19:20,22 20:16 27:6 29:9 30:11 32:4,20 33:16,19 39:5,15 39:20 40:9,17,22 41:6 48:14 53:22 58:5,10 62:9 64:12,15,18 65:8 66:21 67:2,5,8,15 67:16 68:8,14 73:4 77:21 106:12 107:6 113:1 116:19 117:3,6 124:6 125:8 126:2 127:5,8,18 128:1 128:7,14 135:12 138:13,16 139:10 148:11 153:22 155:6 156:7,14 157:6 158:5,9,16 161:11 162:9 166:14,22 167:6 177:10 193:2 194:12 196:13 198:12 199:18 200:1,4,5,8 203:3 203:9 205:7,11,15 205:18 208:1,11 209:12 224:3 225:9 233:13,20 234:4 236:6,11,17 240:11 249:14 251:13 252:6 254:18 255:5,20 256:2,4,9,22 258:17 266:14 269:17 Chevron's 12:10 35:5 39:1 68:2,18 128:9 166:5 184:18 198:12 250:8 255:2 chief 123:13 134:5 250:8 children 28:2,5 31:22 168:22 260:18,19 Chittim 141:17,18 141:19,20 147:11 170:21 choice 31:13 202:4 270:16 choose 154:6 chose 249:15,15 chosen 200:6 Christine 123:22 chump 224:14 churches 222:21 circulated 105:16 citation 182:8 193:7 citations 39:17 41:6 116:19,20 128:7 194:19 cite 194:6 cited 40:22 139:4 182:12 cities 186:5 227:10 242:14 citizen 235:4 citizens 201:1 254:14 255:7 256:17 Citren 257:16,17 257:19 260:2 city 9:2 13:18 26:10 33:10 43:15,19 49:12,17 55:14 61:14 66:9 100:20 134:11 135:5 136:4 137:4 139:20 150:20 156:21 157:14 158:8 159:5,11,18 161:3 162:4,22 172:22 200:1,6 209:15 222:12 235:5 247:8,12,16 247:19 248:2,11 248:13,18 251:14 257:11 260:9 264:14 city/county 55:15 civil 116:21 128:8 256:10 clamp 109:6,13 110:17,20,20 clamps 40:2,4,10 40:13,15 41:2 108:17 109:4,15 109:17,20 110:3,7 127:22 166:18 167:7 clarify 38:4 clarity 183:3 Clark 153:1,2,3 163:9 Claudia 257:16,19 Clean 95:1 148:9 227:21 258:16 clear 18:13 22:20 24:12 31:20 97:16 97:19 98:20 99:13 100:9 101:14 131:3 145:22 163:22 207:1 219:18 239:11 273:7 clearly 8:1 19:20 57:4 98:3 99:5 100:8 104:3 139:4 226:22 232:4 248:7 climate 238:18 Clinton's 157:13,18 close 25:9 34:12 42:20 129:5 195:6 214:4 222:20 235:8 closely 107:22 119:5 165:9 closest 33:16 closing 132:22 223:7 Club 205:3 Clyde 125:2 co-workers 166:1 Coalition 153:2,6 162:15 code 41:3 47:15 192:10 codes 84:1 COHEN 1:17 collaborate 112:20 Collaborative 7:2 164:1 168:6 201:15 205:5 colleague 122:15 colleagues 11:20 164:14 236:3 collect 78:16 79:12 92:5 109:1 132:14 145:1 collective 104:16 collectively 155:20 collects 86:22 color 33:12,17 159:18 Colorado 63:5 COMAH 91:20 92:6 94:8,9,13 combination 167:13

202-234-4433 Neal R. Gross and Co., Inc. Page 281 come 31:17 34:14 158:2,21 165:19 165:20 194:21 249:16 260:3,5 270:8,17 271:21 comes 27:14 137:14 219:8 coming 36:19 47:5 158:6 173:15 191:2 192:21 197:21 207:16 223:18 235:6 243:8 255:10 commence 102:9 commend 195:16 205:9,20 commended 18:6 comment 5:11 55:18 144:5 147:20 169:18 184:11 188:9,18 190:7 238:3,19 commentary 97:21 commenters 112:1 commenting 111:13 comments 2:16 5:14,16,19,21 6:2 6:5,11,15,17,20 13:19 15:5 20:7 22:3,19 55:19,22 63:18,20 64:1 90:4 111:3,6 118:13 137:22 141:12 142:2 147:13,16 170:17 170:19 171:1 178:15 191:11,18 195:19 202:1,3 203:3,19 263:5,6 264:19 commission 10:14 29:14 93:16,17 216:21 commitment 20:10 125:21 147:4 195:22 197:4 committed 32:15 81:10 122:5 129:17 170:8 188:13,17 committee 31:3 35:15,15 49:12 55:15 57:18 58:1 58:22 59:3 61:13 84:16 154:11,20 157:8 250:13 257:22 265:14 committees 77:14 85:1 105:3 265:12 common 19:7 123:3 214:11 commonality 178:9 commonly 40:4 communications 1:17 4:17 communities 15:22 24:4 33:21 78:2 117:17 139:19 153:10 158:1 159:17 163:9,13 165:4 167:18,19 168:19 171:14 185:16 207:11 214:13 223:17 242:5,16 244:3,17 community 21:1 26:15 27:20,20,22 29:2 30:20 32:9 32:14,16 33:7,16 34:9,12,18,19 48:18 54:9 65:9 113:8 115:11 117:14 119:14 124:20 126:10,21 127:17 129:11 131:14 153:12,19 154:5 157:20 158:16 159:18 160:1,9,19 161:22 162:4,17,20 163:16 164:16 166:4,11 167:12 168:16 182:17 185:10,22 186:4 186:18 191:2 197:22 198:9 200:16 201:1,19 204:5 207:22 208:6,19 209:2 210:3,6 211:2 212:8 214:9 224:9 224:20 225:3,8,8 228:3 229:12,12 231:3 233:16 235:21 243:17 249:12 252:4 257:12 258:3,10 259:6 260:20,21 261:3 265:5 community's 56:21 229:16 companies 15:17 70:11 78:17 81:17 87:19 105:9 121:4 131:18 142:4 156:15 160:19 161:11 165:5 170:1 178:3,9 180:20 194:7 252:2 company 6:8 8:13 8:14 32:5 72:6 74:17,21 75:2 76:13 80:4,9,21 81:2 84:10 104:5 154:18 156:8 157:7 161:13,18 161:19 177:20 178:1,12 181:1 182:12,16 196:4 224:7 company's 68:1 72:4 225:9 comparable 105:21 compare 135:16 compared 57:14 229:10 comparison 65:20 86:14 217:12 compensation 73:3 86:7 competence 165:14 229:3 competency 86:12 competent 13:1 81:4 83:3 86:6 145:15 competing 267:16 268:6 competitive 86:14 complaint 72:11 117:5 complete 25:5,6 171:16 266:11 completed 41:9 completing 116:14 179:19 complex 129:6 179:3 240:18 248:6 complexities 247:5 complexity 143:2 171:21 172:2 247:17 compliance 9:7 14:20 20:12 46:16 52:21 72:9 140:12 179:10 184:21 complicated 59:8 59:14 126:5 210:18 248:12 comply 177:21 component 65:4 96:3,10 119:22 121:10 229:6 components 69:11 82:16 140:4 187:15 composed 53:16 comprehensive 45:12 51:19 197:9 264:3 computer 79:12 179:17,19 180:2 concept 24:21 103:8 121:8 197:6 concepts 71:5 75:14 concern 56:22 85:15 144:7,19 154:10 200:12 216:9 concerned 108:19 153:18 154:18 156:11 162:16 186:17 218:20 233:10 concerning 71:20 89:4 143:21 171:7 concerns 13:7 28:12 97:22 98:5 114:5 142:13 205:12 219:22 concluded 274:20 concludes 81:22 89:11 133:8 conclusion 47:4 54:7 146:5 conclusions 63:9 66:20 68:20 89:3 concretely 118:11 condition 28:4 conditions 191:13 conduct 38:21 52:3 80:8 102:5 119:9 220:11 264:3 273:5 conducted 128:3 144:13 215:22 conducting 71:1 86:12 106:2 128:16 142:11 185:20 conference 5:7,10 confidential 97:7 100:17 101:4 confidentiality 100:17 confirm 128:17 confirmed 218:17 conflicting 172:3 conforming 10:16 Congress 47:21 Congressman 12:7

202-234-4433 Neal R. Gross and Co., Inc. Page 282 36:11,14 59:11 60:3 164:6 192:12 202:11 229:22 Congresswoman 258:8 connects 110:14 conscience 15:20 consciousness 20:9 consensus 180:9 consent 37:18 266:4 consequences 27:10 129:11 171:15 213:22 218:22 consequently 256:15 consider 9:22 19:18 19:18 24:6 25:10 25:16 38:13 42:9 50:11,21 53:2,7 95:3 107:10 110:20 197:10 219:2 222:12 248:20 262:13 269:4 270:2 271:9 274:18 considerable 34:19 65:12 consideration 2:19 47:7 131:22 145:3 191:6 227:9 269:18 considerations 269:4,13 considered 6:1 22:17 50:2 144:22 181:11 218:21 246:14 247:13 266:13 269:12,16 270:21 considering 23:20 110:17 148:12 182:6 consistent 120:17 121:11 133:6 142:20 164:7 208:22 248:15 consisting 105:8 consists 125:11 construction 67:18 77:4 consult 123:3 182:20 consultant 216:21 consultation 84:17 85:5 consuming 101:3 contain 69:10 contained 178:16 containment 19:15 contemplating 131:17 content 65:5 166:15 243:4 contents 5:11 contest 117:7 182:9 context 127:13 continually 131:9 133:4 171:12 continue 22:8 123:2 143:13 156:10 160:2 231:18 258:9,13 259:5,7,10,11 261:11 continued 142:9 163:16 continuing 117:11 123:2 204:1 236:5 continuous 70:8 73:19 75:17 76:4 76:19 77:19 79:15 87:3,13 88:1,10 120:16 121:21 146:22 224:8 246:10 continuously 242:12 Contra 16:8 17:21 21:2,8,12,16 24:3 24:7 35:18 38:10 43:3,11,15 44:3,6 44:16 45:1 49:1 50:14 51:2,11 53:3 54:22 66:8 117:2 128:10,14 133:16 134:7,7,9 135:8 161:8 173:1 190:1 198:10 200:16 202:14 211:13 244:7 247:12 248:4,18 263:14,19 264:1,5 269:20 Contracting 1:19 contractors 87:2 97:2 contrast 44:16 contributing 19:9 contributions 233:15 234:3 control 63:16 68:5 70:20,22 71:4,20 74:20 77:7 79:1 80:1 82:21 85:9 93:1 116:3 150:4 150:6,16,19 239:12 controllable 64:16 controlling 150:9 controls 71:4 83:13 121:19 145:18 150:5,9,12,22 151:3 233:13 convene 264:11 convened 13:17 113:2 125:7 convening 182:21 conversation 91:4 230:22 conversations 97:13 98:14 104:21 149:17 convinced 154:9 cooperating 172:20 172:22 coordination 114:17 221:7 228:20 copies 64:1 copy 55:2 217:5 core 38:18 67:4 142:10 229:6 Coresight(phone... 67:13 Corky 250:9 corner 158:21 corners 165:3 cornerstone 46:9 corporate 87:18,21 208:12 corporation 34:1 233:12 corporations 36:1 165:3 234:10 240:2 259:18 correct 17:4 22:13 35:21 41:4,8,18 corrected 17:9 corrective 68:2 78:9 correctly 81:5 146:5 204:11 223:22 240:1 correspond 51:16 corresponding 145:22 corroded 39:21 162:11 corrosion 12:4 19:16,21 38:22 39:9 64:22 65:6 67:22 71:16,21 77:6 80:16 104:1 119:18 120:3 128:12 138:19 139:10 166:6,18 206:3 228:15 243:7 corrosive 139:11 167:16 203:14 corrosiveness 166:16 corruption 237:1 cost 8:15,17 219:9 247:17 251:13 Costa 16:8 17:21 21:2,8,12,16 24:3 24:7 35:18 38:10 43:3,15 44:3,6,17 45:1 49:1 50:14 51:3,11 53:3 54:22 66:8 117:2 128:10,14 133:16 134:7,7,10 135:8 161:8 173:1 190:1 198:10 200:16 202:15 211:13 244:7 247:13 248:4,18 263:14 263:19 264:1 269:20 Costa's 43:12 costing 256:2 costly 145:21 costs 220:19 cough 252:18 council 6:22 31:2,2 49:17 55:14 156:1 159:11 161:3 201:8,13 209:15 222:11,12 244:21 246:1 248:17 Councilman 250:9 250:9 counsel 1:17 4:9 112:9 259:7 267:15 counseling 259:21 counted 235:12 counter 243:19 counterparts 66:2 210:17 211:17 countless 243:12 countries 15:8 29:13 37:10 65:20 66:2 90:17 93:8 102:10 105:1 139:4 144:2 country 10:5 43:5 57:15 103:4 153:8 160:13 177:13 192:15 233:9 counts 117:8

202-234-4433 Neal R. Gross and Co., Inc. Page 283 county 16:8 17:21 20:20 21:2,11,12 24:3 28:6 30:19 35:18 38:10 43:4 43:15 46:15 48:8 49:2,13 50:14 51:3,20 54:22 55:17 57:10 59:1 61:15 66:8,9 116:12 134:7,7 135:4,9,10 136:5 137:4 153:1,6 155:11 161:8,15 173:1 182:1 198:11 202:15 211:13,16 244:7 246:5 247:13 248:4,18 263:19 264:1,5 county's 44:21 51:15 128:10 134:11 162:15 countywide 190:20 couple 58:2 97:1,3 102:10 171:1 192:8 194:3 239:8 255:22 coupled 39:9 course 26:20 28:16 68:14 108:1 118:20 124:19 175:13 186:9 211:17 240:8 court 44:12 51:8 60:7 112:2 118:1 166:21 225:12 courtroom 236:13 cover 20:17 44:21 94:18,22 coverage 94:12 95:2 covered 8:6 45:16 45:17 52:5,6 71:2 76:6 94:15 95:4 craft 133:1 crazy 240:17 create 159:4 237:7 created 115:17 116:7 172:4 199:20 creates 100:6 creation 73:13 77:13 credible 214:22 credit 22:1 53:10 credited 39:10 criminal 117:2 128:11 161:17,20 162:6 199:20 crises 198:19 240:18 criterion 102:22 critical 24:5 101:20 101:22 106:5 130:18 189:19 242:4 criticisms 14:5 25:6 143:21 crude 64:17 71:19 130:11 166:5,9,15 166:16 167:16 168:10 203:15 222:17 223:2,4,10 242:22 243:5 CSB 2:8 4:4,5 5:15 7:19 8:20,21 9:11 9:14,16 11:1,20 12:1 13:17 16:11 16:22 17:18 18:1 20:7 21:4,6,10 22:8 23:1,22 24:5 25:21 26:17,19 28:21 29:5 35:5 36:19,22 38:3,11 42:7,12 43:8,14 44:2,22 46:3,14 46:20 47:5,12 49:3 50:13,17 52:8,12 53:1 54:4 54:5 55:9 57:20 58:11 62:11,22 63:19 65:14 66:3 66:4 67:2 68:15 69:18 71:14 73:1 73:6 75:3 78:3,14 89:6 98:15 100:14 106:17 112:18 113:2 119:6 121:9 123:2,19 124:9 140:2 142:2,7,13 143:12,13,18 144:11,16 146:5 146:10 149:4 150:14 173:6,14 174:11,13 177:22 183:21 184:16 185:20 191:1 192:22 193:1 196:12 201:17 205:7 212:18 213:12,20 214:4 215:12,20 216:3 216:11 217:3 218:2,8,20 219:2 220:10,20 221:10 221:15 222:8 224:12 235:6 241:9,18 242:2 244:4 247:11 248:3 249:7,22 263:3,10 264:19 266:13 CSB's 45:21 53:21 66:21 68:20 73:11 142:8,9 143:19 148:3 184:12 185:1 213:14 242:7 247:2 248:20 csbmeeting@csb.... 147:15 151:14 cultural 109:14 110:13,19 culture 14:7 20:8 108:19 110:10 121:1,4,21 126:6 135:1 137:14,18 196:1 198:13 cultures 109:21 curious 95:17 current 8:1,21 21:20 22:22 23:4 23:9,13,16,21 33:9 54:18 55:17 72:8,13 73:12 76:20 78:8,15 103:14 118:12,18 139:5 142:16 143:14,22 146:14 147:2 151:4 171:3 181:5 183:3 187:19 191:20 200:2 203:2,4 224:1 226:21 228:10 229:11 230:13 254:4 currently 17:3 51:5 78:13 79:6 89:10 92:11 94:1 95:4 102:3 104:12 148:12 149:14 181:22 216:15 248:11 curriculum 190:17 190:19 custom 89:18 cut 165:3 268:11 cutting 31:9 cycle 150:2 180:8 D D 3:1 83:11 87:22 265:16 D.C 36:21 124:11 147:21 DA 161:15 162:2,4 daily 155:10 157:6 254:3 255:15 Dakota 210:11 Dakota's 243:8 damage 67:8,10 71:18 77:7 damaged 119:21 damages 34:19 Dan 1:20 2:9 63:7 66:19,22 74:15 108:21 127:2 dangerous 33:14 34:13 203:15 222:12 239:21 242:22 243:10 dangers 35:7 210:13 Daniel 1:16 2:17 111:5 dark 78:15 data 8:15 11:2 37:8 38:4 46:18 78:17 79:13,13,14 87:12 87:15,17 88:2 90:8,13 92:5,11 94:6,11 114:18 132:15 144:8,17 145:2 146:20 215:5 219:18 220:13 253:7 264:21 database 265:16 date 109:17 124:14 182:10 dates 252:13 dating 178:7 daughter 253:6 day 28:7 39:7 61:3 166:1 235:11 253:1,1,3,6 257:1 days 178:8 252:12 253:2,4,13 256:16 256:19 257:2 266:12 deadlines 67:13 deadly 65:13 deal 4:11 22:15 60:8 100:13 157:9 186:12 192:20 268:19 dealing 58:15 153:21 186:14 Dear 36:17 48:9 deaths 42:22 254:10 debate 165:16 decade 12:2 65:11 decades 27:10 190:15 222:19

202-234-4433 Neal R. Gross and Co., Inc. Page 284 December 5:8,19 49:19 117:10 decent 153:16 decide 16:1 44:11 165:3 decides 126:12 deciding 80:1 decision 20:21 39:10 42:4 75:15 115:12 156:13 187:18 220:17 244:6 decisions 71:20 156:17 196:5 214:20 246:16 declare 274:18 decline 91:18 135:14 179:1 declining 14:18 decrease 90:20 decrepit 222:18 dedicated 21:7 129:22 deep 99:13 216:21 defend 194:21 defended 98:8,11 defending 128:6 defense 200:22 201:8,13 deficiencies 21:20 88:4 deficiency 218:2 defined 69:16 defines 74:16 definite 91:9 267:4 271:19 definitely 156:16 186:17 226:19 definition 76:10 degree 99:11 delay 166:18 231:22 delays 231:15 deliberation 174:4 deliberations 262:14 demand 32:21 demanding 166:22 democracy 209:5 democratic 237:2 demonstrably 243:22 demonstrate 37:13 41:20 75:13 76:7 86:3 demonstrated 83:16 143:3 171:22 220:15 249:11 250:5 demonstrates 144:8 demonstrating 43:22 demonstration 37:17 74:21 229:8 denied 154:3 Denver 63:5 department 30:19 123:14,20 124:15 127:10 196:22 243:11 departments 113:6 115:22 125:12 deployed 7:15 43:8 deploying 124:9 Deputy 111:16 112:8 118:5 125:10 derailments 243:13 described 82:15 describes 75:10 129:12 describing 21:7 description 21:21 deserve 14:22 47:20 230:16 258:1 deserves 22:1 48:19 174:4 204:6 design 67:20 75:13 75:14 79:22 123:4 149:14 150:11 designated 39:19 designed 10:21 149:19,22 desire 189:8 214:11 despite 67:22 destroyed 257:3 detail 9:11,20 60:21 detailed 90:13 196:18 details 4:18 59:9 136:16 detect 14:19 detected 109:12 detectors 208:14 determination 154:4 determine 88:4 determined 76:11 137:11 determines 84:3 146:3 detoxing 255:15 develop 82:8 84:6 86:21 176:8 220:13 248:13 developed 46:13 68:3 92:14 129:16 215:10 253:19 265:19 developing 55:16 103:14 164:15 179:6 190:19 251:9 development 84:7 85:6 88:22 97:18 99:3,8 101:16 103:8 187:6 diagrams 108:10 dialogue 173:8 Diane 201:7,12 dictate 126:16 die 160:2 250:13 difference 92:16 145:5,20 differences 59:16 98:19 99:5 167:11 different 12:13 13:11 22:9 37:11 57:5 59:13 90:17 96:17 118:15 143:10 167:10 172:8 189:5 193:21 220:12 difficult 7:5 95:7 111:8 145:21 250:5 258:7 difficulties 28:11 270:14 diligent 7:5 207:19 diligently 43:20 diminished 219:3 DIR 123:21 124:21 125:3 direct 16:18 44:7 51:3,12,16 59:1 72:22 174:18 202:15 263:20 directed 130:5 221:16 263:10 directing 206:22 direction 84:12 91:6 127:21 205:7 directive 219:6 directly 44:18 director 1:16,18 4:15,16,17 62:11 63:4 111:5 123:21 125:3 133:16 147:21 173:22 190:12 227:20 246:1 Directors 254:19 directs 263:8 267:1 dirtier 203:14 dirty 165:20 223:4 242:22 disadvantages 176:9 disagreement 99:12 disapproval 7:12 disapproving 267:9 disaster 132:4 160:15 161:13 166:7 228:12 239:10 244:1 disasters 148:6,16 206:2 229:13 disclosed 218:21 disclosure 168:10 discovered 51:9 discrepancy 73:2 discretion 51:7 197:11 discuss 18:22 20:18 66:20 74:12 75:6 173:10 discussed 107:14 206:4 271:15 discusses 63:11 228:19 discussing 6:3 22:12 discussion 33:4 34:6 36:12 37:1 38:6 49:20 50:21 55:11 112:4 169:6 238:5 244:19 262:16,22 272:6 272:10 274:13 discussions 173:12 diseases 209:4 disingenuous 237:5 dismissed 19:22 180:11 disproportionate 159:1,17 162:19 261:1 disproportionately 28:3 33:17 157:21 158:4,20 distance 107:14 distinction 107:17 distinctive 121:10 distributed 149:5 district 16:20 44:10 49:1 51:6 117:1 125:1 139:15 155:8 161:7,9 227:21 241:1 244:9 252:21 districts 116:3 divisive 163:18

202-234-4433 Neal R. Gross and Co., Inc. Page 285 165:10 doctor 235:11 252:8 255:16 Doctors 252:15 254:20 doctrine 35:10 document 81:13 83:5 94:7 161:6 259:4 documentation 60:14 82:20 179:13 documented 85:17 230:9 documents 15:11 75:17 78:20 96:5 100:15,21 101:1 101:18 105:22 259:3 dog 159:22 doing 118:11 122:5 155:11 161:10 171:11 207:19 233:5,20 258:9 dollar 8:15 32:4 219:10,12 240:12 dollars 128:8 199:8 220:7 domestic 177:12 Don 1:18 2:9,12 62:14 63:3 67:2 93:21 127:2 173:9 Donald 82:1 door 156:4 158:22 233:6 doors 31:18 doubts 225:6 dovetails 16:4 downfall 180:5 downtown 139:15 dozens 29:8 Dr 4:4 13:15 20:5 111:5,7,19,22 117:20,21 118:2 122:15 123:11,11 123:12,17 131:8 133:14 138:3 141:16 147:10 151:12,22 152:2 152:22,22 153:2,3 163:8,8 164:13 169:4,7,11 173:19 177:1 184:3 187:8 187:10 189:21 190:8 198:1,4 201:6 204:8,17 207:7,10 212:15 213:3 216:13 217:1,7 218:10,16 219:21 220:4 221:19,22 222:4 223:12 226:1 227:15 231:5 234:14,20 235:2 237:19 238:1,6,12 238:15 241:12 244:15,20 245:2,4 245:7,11,14,17,19 249:2 250:16 257:15 260:1,10 260:13 261:4,7 draft 5:5 21:18 24:15 47:13 49:13 49:19 50:20 53:12 54:13 63:10,18 64:12 66:21 113:11 142:2 144:16 148:3 158:6 196:17 217:22 241:22 drafts 136:9 dragging 231:15 drastic 257:5,8 drastically 256:13 draw 159:15 drawbacks 183:1 drive 70:15 79:14 88:1,9 drivers 127:5 driving 255:21 drop 252:18 drum 150:21 duct 31:17 due 17:12 19:15 41:14 46:1 64:21 107:18 109:17 139:9 172:3 205:17 224:11 duplicate 238:2 duplicating 13:9 duty 75:6,7 82:18 85:17 92:4 dying 254:15 E E 3:1,1 83:19 88:7 265:20 E-R 231:10 E-R-K-E 169:15 E-R-R-E-Y 222:8 E-T-H-A-N 241:16 eagerness 15:1 earlier 59:12 92:15 97:22 131:7 136:16 170:20 173:9 188:18 189:17 192:1 258:5 early 55:3 116:11 127:20 178:8 179:7 ears 224:21 easier 179:18,22 182:5 259:16 easily 138:17 East 37:10 227:20 255:11 easy 81:8 echo 201:22 economic 31:11 edge 31:9 editor 14:10 Eduardo 198:4,8 educate 259:6 educating 258:2 education 115:11 educational 211:1 effect 21:1 24:2 92:12 108:9 253:13 effective 45:1 50:6 50:14 51:1 67:19 81:9 82:21 83:9 83:12 85:9 98:9 98:12 139:6 140:5 142:18 146:15 149:20 150:9 151:3 172:15 174:14 179:15 187:15 193:13,22 206:13 213:21 215:10,15 217:19 217:20 220:5 224:22 265:3 effectively 68:4 69:7 70:8,14 71:11 81:21 165:14 172:17 217:10 224:17 244:11 effectiveness 21:2 21:16 71:3 72:16 83:15 86:3 87:7 143:17 145:18 147:3 218:4 225:7 263:12 264:22 efficacy 217:13 effort 17:19 54:5 61:12 106:12 119:8 201:20 207:5 effortlessly 42:17 efforts 54:8 124:13 127:1 130:18 142:6,10 143:8 172:5 173:11 199:11,14 219:13 221:9,11 eight 194:13 253:17 either 110:10 146:1 238:14 267:8 271:12 either/or 23:6 164:21 202:4 El 138:13,17 139:12,14,19 elect 234:8 elected 2:5 26:5 32:14 48:3 55:7 85:3 104:4 105:1 106:22 161:9 186:20 209:22 214:12 220:16 229:19 election 77:12 199:19 209:12,15 elections 199:9 236:18 237:3 elective 102:1 electronic 55:2 element 98:18 105:2 151:11 170:13 188:12 elementary 139:16 elements 22:20 69:9 83:10 99:7 99:19 122:8 132:21 174:10 175:18 179:14 180:21 181:8,9,13 188:6 eliminate 117:16 eliminates 150:7 eloquently 106:4 188:10 email 14:12,15 147:14 173:20 184:6,7 187:11 204:21 emails 184:5 embrace 191:15 embraced 183:19 emergency 3:16 39:22 65:1 79:2 113:9 114:2,21 116:5 120:12 130:13 255:22 eminent 127:16 emission 254:4 emissions 159:3 241:5 252:3 255:4 256:5 emitted 253:6 254:12 emphasis 9:3,9

202-234-4433 Neal R. Gross and Co., Inc. Page 286 79:22 128:2 165:1 emphasize 55:21 118:16 229:1 empirical 215:14 218:7 219:18 employ 72:20 129:3 employed 67:21 employee 54:6 174:10 195:21 196:11 197:3 employees 12:9 45:15 84:17 86:10 171:13 177:10 196:8 224:8 255:4 255:6 employer 17:4,5 41:4 70:22 82:18 employer's 42:16 employers 17:12 41:14,18 42:21 92:5 140:14 214:12 employing 205:16 empowered 265:7 empowering 175:18 empowerment 103:16 105:18 228:21 empowerment's 100:1 empowers 176:14 enable 200:14 enacted 192:5 encourage 54:11 228:5 229:14,18 230:11 encouraged 73:7 encourages 143:13 endangered 65:7 endured 208:21,21 enemy 181:18 energy 95:1 170:4 enforce 44:18 51:12 159:11 161:3 162:5 209:8 250:4 enforceable 206:19 209:9 enforced 160:6,8 enforcement 16:18 16:21 17:22 44:7 44:9,12,21 45:3 45:10 51:2,4,5,7 51:15,17 58:4 59:1 112:9 115:9 116:15 145:8 156:1,2,11 161:5 161:7 193:14,22 202:14,16 206:18 230:7 236:15 257:6,9 263:13,20 266:1,3 enforcing 56:3 128:9 engage 149:17 188:10 engaged 183:14 189:2 engagement 187:5 engineering 13:16 39:6 80:15 150:11 178:5 215:3 216:17 engineers 6:19 39:4 46:8 180:4 195:10 enhance 143:5 170:10 enhanced 114:1 115:10 123:5 enhancements 143:14 enormous 14:17 enrich 208:8 ensure 58:3 67:18 70:7 80:8 81:8 86:7,11,13 125:15 140:11 141:1 146:3 147:7 165:12 206:18,21 214:13,20 224:22 229:15 246:15,22 ensures 42:2 77:18 ensuring 80:13 124:1 201:2 229:4 entered 3:13 entire 21:7 entirely 143:10 172:8 176:2 entities 227:11 entitled 113:12 256:10 environment 83:14 163:10,14 182:7 187:20 207:12 223:18 244:17 environmental 30:6 31:11 69:1 112:10 113:8 117:8,13 126:22 133:5 134:5 151:18 153:7,20 157:11,14,16,17 157:21 158:7,18 159:7,13 160:7 161:4 185:5,11,18 186:8 198:9 200:7 205:2 238:18 environments 77:6 242:6 EO 88:22 EPA 8:6 25:16 69:21 105:22 111:17 116:1 118:7 128:15 148:8,12,15 155:13 258:16 episodic 208:22 equal 13:4 77:16 80:21 84:12 140:17 225:15 equipment 67:18 92:20 109:7 equivalent 69:5 195:5 ER 235:11 Eraso 201:11 erosion 19:17 escaped 28:17 especially 24:13 153:20 230:6 242:8 essential 27:22 80:18 84:12 170:13 203:22 204:2 224:19 242:8 essentially 112:3 207:21 250:2 establish 10:1 69:7 78:4 82:9 258:8 established 25:14 46:18 53:10 105:4 264:14 266:11 establishing 132:14 221:3 establishment 84:22 85:1 142:15 et 57:8,8 93:1 Ethan 241:13,16 Ethics 222:10 241:14,17 European 8:18 29:13 37:9 evaluate 67:9,17 81:1,5 114:11 145:17 154:15 264:21 269:5,6 evaluated 11:3 evaluating 125:14 132:19 evaluation 89:2 123:1 217:12 evaluations 156:19 evening 12:1 18:21 33:5 36:20 48:5,7 62:21 63:22 111:20 112:5 118:3 123:10 133:11 134:1,4 136:17 137:22 141:12,19 153:3 163:12 177:4 190:10 198:7 201:10 204:18 207:15 213:8 217:2 221:18 223:15 226:3 227:18 245:13 251:4 evening's 217:6 event 126:4 events 19:15 34:17 34:20 214:10 evergreen 75:17 81:13 everybody 211:7 256:8 evidence 12:10 13:20 110:16 215:5,14 217:8 218:11 evidenced 138:20 243:12 exactly 30:1 34:7 121:22 examinations 93:6 examine 18:10 38:15 207:20 examined 8:11 examining 110:13 example 23:10 71:14 77:4 90:18 91:13 94:18 98:2 100:19 105:6 120:6 149:3 150:11,19 172:10 179:14 202:14 216:13 240:21 266:3 excellent 18:6 228:19 excesses 200:22 exchangers 92:22 exchanges 176:7 excited 18:21 excluded 38:11 exclusively 130:1 execute 178:10 execution 147:6 189:17 executive 19:13 25:14 88:21 89:9 132:2,6 135:19 157:13,19 160:14

202-234-4433 Neal R. Gross and Co., Inc. Page 287 183:16 190:11 219:6 221:3 246:1 258:21 262:14 executives 34:2 exercise 180:3 exert 199:14 exhaustive 106:12 exist 63:12 104:16 existence 69:17 existing 37:3 51:8 52:1,20 68:21 69:12 70:5,17 71:10 72:1,19 88:18 110:3 113:18 116:8 120:20 137:6 143:5 144:17 149:16 171:9,17 172:5,15 219:13 221:12 exists 93:13 102:3 104:11,12 192:13 194:8 exits 3:11,15,16 expand 44:20 51:15 197:16 expanded 242:17 expanding 17:21 183:3 242:14 expanse 134:20 expansion 52:18 158:14 244:10 expansive 101:8 expect 49:15 expectations 14:14 expecting 158:9 expects 113:14 expending 146:12 expense 14:8 243:17 expenses 154:5 experience 10:16 72:22 86:11 189:16 210:21 213:17 experienced 65:21 71:17 81:4 179:1 experiencing 65:18 experiment 258:15 experiments 90:12 expert 37:13 74:15 124:10 182:21 264:12 expertise 39:6 47:6 52:11 54:10 68:1 80:16 124:12 experts 12:10 20:1 22:5 37:19 43:2 50:12 194:21 216:10 259:9 explain 165:21 explained 12:11 explicitly 96:19 exploded 226:12 exploding 239:7 explore 170:1 183:1 explored 143:9 172:6 181:11 exploring 15:3 221:11 238:21 explosion 9:2 56:10 62:7 165:22 228:17 239:5 243:14 explosions 56:13 214:1 243:13 exposed 182:11 exposure 256:6 expressed 176:18 183:8 expresses 217:3 237:5 extend 124:7 extended 185:3 extension 208:1 extensive 22:2 97:13 104:21 122:12 223:22 extent 85:21 99:12 99:16 100:11 143:12 173:6 extraordinarily 126:14 129:6 extraordinary 39:6 extremely 64:21 eyes 28:10 224:21 F F 84:3 266:1 face 161:20 179:16 179:16 182:7 faces 33:6 203:13 facilities 8:2,6 13:14 19:11 24:11 37:12 45:16,17 48:20 52:4,6 53:6 76:6 94:19 95:3 96:13 129:1,13 134:9,19,22 142:22 149:7,11 174:15 175:1,19 176:3 179:8 193:4 193:10,17 206:7 214:13 246:6,21 264:7 266:7 facility 45:12 75:20 76:2 78:2 87:17 87:21 88:3,13 92:7 108:17 126:16 127:18 128:1 132:3 137:15,16,17,19 137:20 148:5,16 180:15 205:14 221:4,6 228:11 facing 188:11 240:18 242:17 fact 14:1 15:10 19:12 24:22 28:14 34:11 60:17 70:2 98:5 99:1 108:13 130:2 144:11 149:12 158:1,17 159:5 195:7 218:9 factor 19:9,19 20:22 260:22 factors 34:8 77:18 80:17 120:6 126:15 134:20 190:19 197:9 facts 9:10 106:14 106:18 228:9 fail 39:2 200:11 232:13 failed 150:17 failing 37:3 fails 219:2 failure 12:8,8,11 38:19,20 40:2 42:20 109:9,9 114:11,13 178:9 228:11,12,13 failures 10:22 16:10 20:5,13 39:8 67:15 68:18 228:10 fair 183:10 fairly 91:19 93:14 101:6 193:4 fall 115:19 177:16 215:13 falling 14:14 falls 24:17 FAME 193:19 familiar 103:10 185:13 families 214:5 256:3 family 186:16 far 14:14 18:7 19:7 37:10 40:10 57:6 57:20 154:17 162:15 191:21 196:18 215:13 218:7 232:22 241:3 257:2 fashion 230:5 faster 230:5 fatal 249:10 fatalities 14:4 66:6 66:7,11,12,14 father 165:19 fatigue 19:17 120:6 120:7,7 faulted 14:2 218:15 favor 61:1 favorable 91:2 favorably 135:17 fear 103:4 214:7 237:5 feasible 85:21 99:16 100:11 264:7 feasibly 46:19 feature 75:5 76:3 76:17 77:9 79:4 79:16 80:12 features 75:4 February 41:7 109:2 federal 5:6 6:7 53:16 69:20 88:13 89:7 131:21 132:1 143:4 181:21 193:13,17 195:1 220:20 221:4 247:7 feed 225:10 feel 27:2 140:4 164:19 176:6,11 176:18 270:14 271:4 feels 106:14 fees 46:6 52:16 130:6,9,15 fellow 3:20 177:5 186:3 FEMALE 234:12 240:6 fewer 14:19 field 72:21 180:4 fields 243:9 fifth 79:4 fight 33:19 182:13 259:11 fighters 65:8 fighting 166:17 167:6 figure 16:3 file 41:5 161:17 filed 17:12 41:14 117:2 files 17:5 fill 45:22

202-234-4433 Neal R. Gross and Co., Inc. Page 288 filled 39:5 filling 52:9 final 2:19 6:3 7:8 20:16 49:19 54:16 80:12 113:15 196:20 232:7 269:17 finalized 130:13 finalizing 38:13 42:7 finally 64:11 68:2 72:18 80:7 197:6 197:13 224:17 225:16 266:10 finance 200:5 financial 37:7 65:22 196:5 206:16 find 9:15 16:20 44:14 109:3 151:10 191:5 Finding 68:21 69:12 70:5,17 71:10 72:1,18 findings 2:8 20:19 21:19 46:13 47:14 53:18,21 63:9 64:6 66:20 67:3,6 68:20 73:16 89:3 106:18 107:4,12 107:17,19 113:16 114:4 115:14 117:9 136:11 139:8 142:12 196:19 214:22 228:8,8 249:17 finds 9:14 193:9 fine 39:14,15 161:20 199:18 203:5 238:14 240:12 fines 117:6 209:13 224:14 finish 259:17 finished 271:2 fire 28:8,9 29:6 38:18 43:6 48:14 53:22 64:18 65:8 113:1 119:19 124:6 127:5 135:12,21 136:1 136:21 198:12,13 199:20 203:9 235:8 242:19 243:7 251:17 252:12,14 253:3 253:19,20 254:1 254:10,14 fireplaces 256:19 fires 37:5 48:17 56:13 117:16 214:1 first 5:2 20:21 26:8 34:14 35:19 51:1 67:8 75:5 92:3 96:20 110:16 112:13 115:17 119:4 127:14 140:20 145:1 153:13 166:2 175:4 182:22 185:7,19 192:8 200:21 202:2 220:11 223:21 225:14 232:14 233:10 239:18 241:18 251:8 257:21 261:11 262:7 267:17 268:3 273:4,13,15 274:5,9 five 45:15 46:1 52:3 56:18 76:1 138:12 155:14 238:22 249:9 261:12,13 fix 23:20 40:5 118:12 119:2 165:7 fixed 109:13 fixing 110:7 166:18 flags 39:9 flaring 34:22 208:21 flaw 249:10 flawed 246:19 flaws 60:9 fleshing 164:15 flexibility 200:13 floor 266:18 267:2 273:8 focus 29:17 38:16 107:21 129:22 143:14 146:10 182:14 207:1 231:18 248:2 focused 11:8 119:18 127:11 213:21 231:13 focuses 24:15 focusing 71:6 154:13 folks 208:2,3 follow 119:5 126:17 178:3,10 179:9 181:6 229:22 230:14 follow-up 93:21 196:10 230:10 followed 64:6 following 11:15 26:4 39:20 68:19 72:10 80:9 82:4 82:16 116:16 119:10 125:8 127:14 150:13 166:21 181:4 214:9 230:12 262:5 263:9 264:16 265:4 follows 5:1 footing 140:17 force 11:13 47:9 53:16,19 54:1,5,6 112:12,17 115:17 115:18 116:4 118:9 125:6,11 127:10 132:13 136:15 172:21 199:2 208:7 forced 31:15 forego 181:18 foregoing 261:14 Forest 241:14,17 forever 214:5 forge 111:14 forget 56:17 form 183:4 formally 168:13 format 13:11 179:9 formed 53:17 116:4 former 157:12 212:18 213:10 forth 54:12 101:8 210:9 forthcoming 230:12 forum 98:15 forums 84:6 forward 20:15 23:8 30:8,12 32:13,19 59:18,19,21 61:2 61:8,13,13,17 117:11 119:7 120:3,14 132:5 168:9 173:16 183:20 187:4 223:5 249:17 251:11 270:4 271:21 fossil 238:21 foster 171:13 found 9:13 10:12 12:1 40:9 68:15 71:14 73:1 78:14 91:17 95:16 131:16 139:12 254:18 foundation 38:6 192:6 foundations 54:12 four 56:18 66:7 114:15 116:2 134:8 205:1 260:20 264:5 fourth 77:9 115:10 fraction 45:19 51:21 66:15 framework 10:3,7 20:15 35:12 37:3 42:2 69:2 82:10 82:12 84:19 120:21 131:8 133:2 141:1 142:21 170:14 171:10,17 182:4 frankly 60:4 frequency 50:3 frequent 8:9 37:4 friend 14:11 55:8 friendly 165:16 167:10 friends 254:2 front 3:17 59:20 61:17 228:5 229:15 237:14 241:7 269:8 Fuel 6:20 22:7 fuels 238:21 fulfill 142:10 full 60:7 95:10,15 164:16 167:1 168:10 182:4 256:12 264:13 fully 22:17 67:9 164:9 183:6,14 220:1 229:14 230:16 263:3 functioning 80:18 functions 85:2 fund 52:17 fundamental 7:17 42:18 217:18 219:1 funded 80:13 86:5 funding 46:5 73:9 128:20 130:17,21 140:8 funny 231:10 further 3:9 16:1 23:22 38:6 42:13 50:21 53:1 54:18 78:6 102:2 139:1 145:3 164:8 166:14 221:6 270:1

202-234-4433 Neal R. Gross and Co., Inc. Page 289 Furthermore 221:2 future 24:10 122:4 122:5 123:7 148:16 206:22 229:13 241:5 G G 3:1 84:9 266:6 G-R-E-A-V-E-S 260:12 Gail 190:4,10 gaining 20:3 gains 171:12,20 games 159:21 gaps 16:12,14 44:3 63:12 67:7 68:7 gas 91:16 98:11 142:5 159:3 170:3 gathered 11:2 Gayle 2:5 general 1:17 4:9 117:1 135:14 161:13,17 197:1 197:15 208:2 211:2 259:13,19 267:15 generally 23:17 44:15 46:17 51:10 178:4 184:12 196:21 generate 179:18 gentleman 223:7,8 238:20 genuine 20:10 195:22 George 36:11 47:21 222:4,7 getting 58:2 184:6 253:22 254:15 261:12 Gill 191:16 Gina 117:21 118:4 Gioia 43:19 48:4,6 54:22 55:5 61:7 164:7 229:21 Gioia's 202:12 give 5:3 15:7 23:16 26:9 103:3 245:10 given 17:17 95:8 191:20 225:4 230:17 247:9 gives 183:11 giving 17:12 41:14 202:14 257:22 glad 33:6 96:15 257:21 go 3:9 4:18 19:1 31:16 36:9 46:17 49:16 52:19 56:17 60:5 61:4 76:13 76:20 101:3 111:3 120:19 133:22 134:13 144:4 151:14 152:3 189:22 201:7 203:12 204:9 207:10 211:8 223:5 227:16 231:6 232:22 235:10 237:20 244:21 249:3 250:12,17 252:11 255:22 264:9 270:20 goal 49:5 69:3,11 120:15 123:3 130:12 191:20 274:10,11 goals 69:7 113:19 173:4 goes 3:14 85:4 102:2 228:18 232:8 265:21 going 4:10,22,22 5:3 7:9,11 56:4,6 57:1 59:17 60:5 62:2 96:6 102:19 110:1,12 112:1 120:19 122:1,17 160:13,20 162:18 163:5 168:1,8 182:8 189:11 195:10,14 209:20 209:21 210:5 240:9 255:10 259:8 261:22 267:10 270:19 271:7 272:18 good 12:1 14:11 15:2,20 18:4,21 21:21 33:5 48:5 57:9,12,14 59:2 62:21 96:22 107:16 111:20 112:5 118:2 121:17 133:10 134:1 137:17 141:19 147:4 153:3 163:11 169:12 177:4 178:5 181:8,9,18 190:9 198:7 201:10 204:18 207:15 213:8 223:15 226:3 227:18 233:18,22 237:16 238:7 245:12 251:4 255:17 gorilla 249:13 government 11:12 13:6,10 15:18 17:16 102:2 140:11 143:20 185:3 186:21 199:3,13,16,18 200:19 206:17 213:19 233:14 246:15 248:10,15 250:3 258:7 Governor 42:5,10 53:10 82:7 86:17 125:7,13 130:8 192:9,22 Governor's 47:8 53:9 113:4,14 119:20 122:2 125:6 127:9 172:20 258:22 grandchildren 31:22 grant 72:2 granted 72:6 graphic 75:5 grappling 167:18 168:3 grateful 29:5 36:22 201:18 gratefully 212:3 Gray-White 251:1 251:1,5 great 8:12 22:15 28:21 58:15 79:21 127:6 178:20 192:20 194:14 197:7 211:20,22 225:20 226:7 230:16 greater 34:22 104:10 115:8,12 138:12 242:18 greatest 25:4 85:20 99:15 100:11 greatly 65:5 Greaves 260:6,7,12 260:14 261:5 greenhouse 159:3 241:4 Greenpeace 147:21 Greg 163:9,12 grew 186:10 Griffon 1:12 2:4 4:5 18:19,20 26:4 36:18 48:10 89:21 90:1 93:20 95:6 102:14 123:19 132:18 232:12 263:1 266:20 267:3,13 268:3 269:19 271:10 272:4,13,21 273:16,17,18 Griffon's 202:3 grips 214:8 ground 37:1 grounded 215:2 group 8:9 25:13 26:7 53:9,11,12 88:14 89:8 104:14 105:8 106:11 108:5 113:3,5,11 113:14,17 114:4 114:15 116:14 119:20 132:14 190:13 207:2 221:5 groups 30:20 105:5 115:20 116:5,7 117:13 153:21 176:5 200:7 205:2 growing 186:13,16 guaranteed 219:19 247:21 guards 72:5 guess 190:2 210:16 212:20 257:17 guidance 39:2 40:12 84:15 105:13,15 119:7 200:6 guide 108:10 guidelines 116:9 149:6,13 Guy 169:5,14 guys 209:19 210:8 211:21 226:6 227:5 H H 84:14 Hackitt 15:14 hair 255:12,17 half 239:5 260:15 260:16,17 hampered 206:8 Hancock 17:15 41:17 hand 14:21 151:8 handful 111:13 handle 129:1 148:22 handled 149:2 hands 95:12 111:11 179:15 193:8 happen 32:3

202-234-4433 Neal R. Gross and Co., Inc. Page 290 109:11 125:16 180:10,12 198:14 201:3 204:5 231:16,20 251:21 256:8 268:17 269:14 happened 32:2 60:12 125:16 126:2 138:16,17 166:2 168:12,15 180:11,15,17 226:12 235:9 239:4 256:7 happening 123:6 158:15 255:1 happens 3:11 118:21 231:11 237:2 happiness 256:11 256:15 happy 111:9 133:18 147:16 hard 26:19 33:19 236:18 249:7 hardball 162:18 harm 31:20 harp 102:19,20 harsh 14:5 Harvey 244:16,18 244:18 haste 214:20 246:16 Hawaii 170:6 hazard 14:10 17:7 17:8 19:14 43:22 67:9 69:9 71:1,8 71:12 72:4 85:7 85:14,22 95:3 114:12 119:21 149:11 150:7 167:8 169:19 180:7 182:3 194:6 hazardous 24:10 45:13,18 46:22 51:20 52:2 78:22 114:22 129:2 133:16 134:6,10 177:15 190:1 hazards 29:19 37:14 46:15 63:16 68:5 69:16 70:22 71:6,18 73:16 74:5,20 75:9 76:16 77:8 78:22 81:14 82:20 83:15 83:21 85:10 102:5 114:14 127:17 145:16 150:10 180:9 182:12 197:5 263:17 head 15:14 25:6 270:17 headed 91:5 headquarters 208:12,13 healing 253:12 health 17:8 19:13 21:3 24:7 29:3 30:19 32:13 34:19 38:10 41:21 43:12 44:6,17 45:2 51:3 51:11 53:4 78:1 84:17,20 85:2 88:15 118:6 120:12 124:17,19 126:22 127:17 128:15 129:11 131:14 133:5,19 134:6 135:18 156:20 157:2 161:22 168:21 173:21 177:6 186:15 187:6 190:18 208:3,6 227:22 229:16 235:21 243:18 244:3 252:5 257:13 263:14,20 264:2,5 healthy 229:13 hear 12:17 31:14 62:3 64:10 103:12 152:13 176:16 197:21 251:20 257:7 heard 28:8 29:12 55:20,22 57:20 59:10 104:20 118:13 125:9 131:7 133:17 136:16 166:12 175:21 188:7,15 188:18 189:7,8 202:2,10,22 203:11 206:14 226:20 227:6 237:8 249:11,12 251:15,18 262:21 hearing 10:4 57:21 173:15 hearings 162:2 heart 236:4 heat 256:20 Heath 190:1,2,3 heavy 255:3,5,12 256:6 heed 12:9 Heights 255:12 held 21:4 28:1 115:18 204:3 Hello 26:13 152:4 169:14 help 52:15 108:10 229:11,12 235:15 helpful 38:3 46:3 46:20 helping 4:11 182:15 241:4 helps 192:20 Henry 153:1 197:14 heroes 240:20 Hi 138:7 241:15 hide 225:9 hiding 210:4 hierarchy 70:20 71:4 80:1 83:13 121:19 150:4,5 high 35:2 78:20 96:4 129:3 135:7 135:10 139:17 149:11 150:20 182:3 higher 37:9 95:3 139:3 166:5,8 233:21 243:3 252:17 highest 8:4 126:20 133:6 254:16 highlight 67:6 201:22 206:12 242:6 highlighted 225:2 highlights 88:16 highly 23:12 24:10 58:9 71:16 80:18 98:9 177:15 216:10 243:9 Hillary 1:17 55:3 Hind 147:20 hiring 220:7 history 30:5 39:16 108:17 110:8 210:20 hit 214:4 Hodgkin's 253:7,9 hold 161:10 199:17 272:21 holder 75:6,7 82:18 85:18 holders 92:5 holding 26:18 147:22 Holmstrom 1:18 62:15,19,20 63:3 82:1,3 90:16 94:3 96:15 103:6 107:15 127:3 149:4 175:4 188:4 Holstrom 2:9,12 home 31:14 124:21 134:8 165:20 214:4 homes 27:17 31:17 31:19 222:21 hope 32:18 36:5 133:21 178:21 239:14 241:7 258:11 259:15 hopefully 61:16 158:9 164:15 230:18 Hopkins 74:16 174:8 Horizon 216:22 Horowitz 1:16 2:17 111:5,7,19,22 117:20 123:11 133:14 138:3 141:16 147:10 151:12,22 152:2 152:22 163:8 169:4,7,11 173:19 177:1 184:3 187:8 187:10 189:21 190:8 198:1,4 201:6 204:8,17 207:7,10 212:15 213:3 221:19,22 222:4 223:12 226:1 227:15 231:5 234:14,20 235:2 237:19 238:1,6,12,15 241:12 244:15,20 245:2,4,7,11,14 245:17,19 249:2 250:16 257:15 260:1,10,13 261:4 261:7 horrible 28:18,19 horse's 62:3 hospital 227:1 252:16 254:20,21 hospitalized 28:4 hospitals 28:15 161:14 203:11 host 28:15 hot 159:4 161:15 162:5 hour 219:15,17 hours 26:19 64:19 128:4 253:1 255:22 257:1 Hoyle 124:10

202-234-4433 Neal R. Gross and Co., Inc. Page 291 Hoyle's 124:12 HSE 15:14 105:17 huge 222:16 human 80:17 120:5 134:20 190:19 humanity 34:15 hundreds 129:3 hurt 140:21 240:13 257:3 hydrocarbon 90:20 91:14,19 hydrocarbons 40:16 93:2 hydrogen 40:16 I Ibuprofen 252:18 idea 12:22 57:6 59:2 197:8 218:18 239:20 252:19,20 258:13 271:17 ideas 47:6 59:13 identification 74:20 85:9 identified 35:4 44:2 45:5,21 46:14 50:17 52:8 67:2 70:11 75:3 81:2 83:21 101:20 114:9,15 118:22 119:20 122:2 145:16 150:18 151:7 178:1 215:9 243:5 identifies 75:9 identify 68:4,19 71:8 87:15 88:3 143:16 ignore 199:11 217:18 224:3 ignored 196:13 205:18 illness 79:7 253:19 illustrates 228:9 illustrating 18:4 IMAGE 192:15 imagine 97:13 209:15 imbalance 22:13 165:2 imitation 187:5 immediate 16:6 18:14 24:2,6 50:9 54:17 127:15 181:12 192:5 immediately 54:15 61:8 122:7 125:8 197:8 227:12 immense 130:2 immigrant 185:15 impact 25:4 27:1 27:14,16 29:3 71:16 109:21 139:18 144:13 158:7 159:1,17 162:19 210:5 215:22 impacted 28:10 65:9 157:21 158:4 158:20 impacts 154:4 168:11 implement 12:19 13:8 16:1 43:20 49:14 61:18 81:21 82:8 83:19 86:21 98:7 99:20 115:15 119:1 142:8 145:21 148:4,15 149:21 190:20 213:15 219:8,11 219:16 220:3 221:17 224:18 228:14 implementation 21:10 22:12 24:14 25:8,16 54:2 70:19 81:9 83:9 83:12 84:7 94:8 137:10 146:8 147:5 152:17 172:15 178:15,18 220:5 225:1 implemented 16:7 30:14 35:17 38:2 63:20 67:14 70:1 82:21 86:1 92:1 93:11 95:22 122:19 132:11 135:18 137:5 158:13 219:7 244:12 implementing 24:18 39:21 81:6 91:7 129:18 164:9 183:2 211:10 248:2 implements 134:10 implicated 255:2 implications 167:2 import 203:13 importance 195:20 important 19:18 23:8 30:4 38:16 50:1 56:11,16 59:7,19 71:5 77:21 102:22 104:18 108:13 112:16 120:8 124:12 148:21 156:3 170:15 176:7 188:19 191:13 193:6 194:2 203:16 214:19 229:1,4 230:10 246:12 247:14 importantly 18:13 37:17 214:14 impressed 258:11 improve 13:13 21:15 47:16 49:4 49:22 50:9 54:8 54:18 55:16 61:10 73:11 105:17 113:22 131:10 133:4 136:2 137:5 143:5,8 147:1 172:5 173:17 176:12 182:2 189:4 198:16 201:21 204:1 220:21 221:6,12 246:9 improved 12:14 48:16 84:1,3 114:17,18,19 202:13 203:17 242:12 improvement 38:9 43:13 70:8 75:18 76:19 79:15 87:3 87:13 88:1 96:12 114:16 120:16 121:22 143:13 146:22 173:7 229:10 246:10 improvements 52:19 53:7 54:20 83:5 88:9,10 114:22 115:4 131:17,21 143:17 146:18 173:1 182:16 183:17 230:3 improves 217:11 improving 24:2 49:5 78:1 113:12 132:2 172:16 178:21 182:5 188:14,17 246:22 inadequate 114:10 194:5 239:13 inadequately 71:8 inaudible 3:10 35:22 64:17 80:8 95:18 116:2 134:16,19 150:16 152:1 189:20 193:3 204:21 206:2 218:14 243:3 249:20 255:16 256:14 273:1 incident 13:18 19:2 20:1,22 21:1 28:18 32:2 56:19 62:9 64:16 65:7 66:10,11,13 67:21 68:3,8 74:1 79:10 85:8 95:1 110:14 114:3,9 116:16,18 117:4 125:8 126:19 127:9,15 134:21 139:9,17 146:11 166:9 184:18 204:4 205:8 209:14 215:1,10 264:14 265:17 incidents 7:20 13:22 19:6,10 27:17 29:8 65:13 65:15,17,19,22 66:4,5,16 70:12 79:1 103:22 119:11,16 123:6 129:8 140:22 170:12 184:19 186:12 189:4,9 191:6 203:7 214:3 215:16 218:13 231:12,19 inclination 110:16 include 16:15 25:6 39:20 44:6 51:16 53:20 78:6 90:15 173:12 183:4 184:10 included 44:4 50:20 53:13 113:5 130:8 140:5 253:14 262:6 268:15 includes 74:19 82:19 89:2 113:19 128:12 including 14:6 39:18 50:4,13 58:1 66:6 87:9 93:15 101:19 114:18,21 115:3 115:11 116:19 120:22 138:13 140:9 150:3

202-234-4433 Neal R. Gross and Co., Inc. Page 292 182:15 201:17 203:8 205:3 206:20 213:20 215:17 217:14 219:13 243:2 inclusion 237:12 income 33:18 185:15 incomplete 114:9 incorporate 7:6 88:8 89:1 122:8 132:20 incorporated 6:2 120:14 183:19 266:13 incorporating 70:9 120:15 incorrect 240:5 increase 128:20 130:15 145:14 158:22 159:3 166:15 172:3 242:21 251:10 increased 65:5 increases 144:18 increasing 46:6 166:9 incremental 181:19 independent 14:3 20:14 86:5 200:5 230:20 independently 81:1 indicate 22:6 indicated 61:7 156:2 indicates 13:20 218:11 indicating 78:17 Indications 247:10 indicator 90:13 92:1 indicators 37:6 70:15 79:6 83:18 86:3 87:1,6,10,20 87:22 90:7,17 91:8,12 183:8 197:7 262:10 265:18 individual 121:4 130:10 179:20 individually 155:20 individuals 7:2 33:18 52:10 industrial 8:8 21:16 30:18 31:4 43:3,11 44:8 47:16 49:8 50:10 50:15,19 52:20 123:14,21 124:16 126:16 127:10 134:11 135:16 136:2 182:1 190:20 211:12 235:20 246:5,9,21 247:1 248:5,6 263:21 industries 68:13 124:3 244:22 246:2 industry 11:5 12:22 13:6,11,12 16:3 27:13 28:1 29:16 29:18,19,21 30:10 39:2 40:12 47:2 49:8 53:5 58:14 66:1 70:14,16 72:21 73:17 74:6 75:1 76:14,21 77:17,22 84:4 86:19 88:3,9 98:9 113:8 118:18 130:17 131:9 133:6 138:20 140:11,18 141:4,5 142:5 163:18 170:11 172:11 173:2,12,18 178:7 178:21 183:9,22 189:7,9 198:17 199:2,5,11,17 200:22 204:3 208:2 213:18 216:5 223:9 225:5 233:6,7 234:4 237:5 239:11,16 242:14 243:16 248:17 industry's 20:8 27:1 139:1 ineffective 68:17 243:22 inextricably 124:20 influence 176:20 199:5 inform 107:11,12 252:3 information 25:19 85:20 97:7 100:18 101:5 109:1,3 114:18 131:13 143:6 146:16 154:3 183:15 210:22 221:1 236:11 249:8 270:1 informed 131:21 220:17 informing 203:22 infrastructure 167:14 242:17 infrequent 129:9 inherent 35:7 99:22 100:2 121:8,16 149:9,18,21 150:1 150:3,4 151:10 inherently 44:1 49:10 67:20 70:19 75:13 77:3 79:22 149:1 205:16 228:14 229:5 246:19 initial 110:15 118:13 174:7 initially 65:2 initiated 7:15 9:3 initiates 84:5 initiative 98:7 197:17 injured 209:2,5 injury 79:7 innovation 69:15 input 25:15 89:10 115:12 130:11 173:16 inquiry 94:11 insert 30:21 inside 208:16 255:8 insignificant 224:13 270:11 insisting 35:16,16 inspect 45:19 51:21 67:13 206:7 inspected 12:4 127:22 inspection 78:10 92:8 140:11 155:15 219:17 inspections 38:21 45:12,15 51:19 52:4 79:14 80:8 83:8 88:6 128:4 155:5,12 179:8 197:10 200:11 202:17 264:3 inspector 74:14 155:9 219:15 inspectors 16:17,18 17:21 23:13 44:14 51:9 149:7 184:21 194:17 195:3 202:18 220:9 224:4 232:17 Institute 6:12,19 141:18,22 170:18 216:18 instructions 195:13 insufficient 217:8 insulation 110:21 insurance 8:13 37:8 insurers 139:2 integrated 171:8 integrating 173:3 192:7 integrity 69:10 78:10 109:9 110:7 intensely 30:21 intent 179:5,6 243:16 intention 101:11 inter-agency 230:5 interact 73:5 80:21 176:4,6 interacted 62:14 interactions 143:20 interacts 239:15 interagency 11:13 112:11 115:16 118:8 125:6 interest 37:22 interested 20:3 57:4 111:12 123:1 interesting 21:19 24:9 106:20 interferes 199:13 interim 11:15 43:17 48:12 49:7 53:21 77:21 108:14,18 119:6 132:17 135:22 196:12 internal 39:1 114:13 196:13 internally 92:5 105:16 international 6:16 95:19 173:22 177:7 178:14 183:14 196:4 interpretation 182:13 intervened 104:10 intervenes 85:14 102:12 intervention 79:18 92:7 interview 242:1 interviewed 98:1 192:18 interviews 109:2 intimate 140:19 introduce 3:19 62:10,17 introducing 171:14 introduction

202-234-4433 Neal R. Gross and Co., Inc. Page 293 143:10 172:7 217:5 introductory 5:3 invest 126:13 investigate 16:22 20:22 107:8,11 127:16 254:6 263:11 investigated 60:16 66:3,5 95:1 106:18 investigating 26:20 29:6 54:1 94:20 106:15 107:5 investigation 9:12 9:19 26:21 32:18 48:12 53:22 64:5 64:9 68:15 81:22 85:8 89:11 100:20 103:20 107:16,20 108:2,21 112:19 122:4,6 125:22 134:22 136:1 152:10 169:19 185:21 198:11 216:20 268:18 269:9 270:21 investigations 7:16 8:21 67:3 68:4 102:5 114:8 142:11 146:11 150:15 191:5 215:1 investigative 2:11 2:14 4:14 62:8,12 62:17 64:6 106:11 106:11,13 124:5 investigator 1:19 63:7,8 66:19 67:1 74:12 investigators 16:11 108:5 investigatory 11:7 investments 196:6 involve 71:12 119:13 involved 15:18 17:19 71:19 77:19 96:7 97:17 101:16 201:2 involvement 96:3 96:10 97:12 99:2 122:20 174:10,16 195:21 196:11 197:4 206:21 265:6,10 274:16 involves 92:18 121:2 140:10 involving 142:4 258:13 259:20 irrelevant 160:18 ISO 31:4 35:17 43:17 44:9,22 45:16 46:22 49:14 51:4,5,9,16 52:5 52:19 53:3 54:14 55:17 57:10,13 61:9,15 isolated 194:18 ISOs 45:1 issuance 54:16 issue 17:2 42:8,11 42:12,14 45:6,8 58:18 73:6 91:14 91:15 94:9 97:8 97:11 100:12 108:16,19,20 109:3,14,19,21 110:13,14,19 118:14 119:18 148:22 154:10 156:14 210:3 235:7 247:5 248:7 issued 39:17 43:8 53:12 113:11 116:19 117:9 196:21 205:13 220:22 issues 11:9 17:20 22:13 31:9 50:22 59:7 60:8 70:12 89:2 93:4,6 96:18 97:6 104:1 107:20 108:3,12 110:7,11 120:2,13 122:4 185:18 186:15 188:10 200:1 228:19 230:2,11 232:11 240:15 250:13 252:5 263:4 266:7 268:18 issuing 44:16 item 261:18,21 J J 1:13 2:3 86:5 January 1:7 5:20 116:18 135:5,6 170:19 Jeff 237:20 Jim 2:7 55:9,13 156:2 270:6 job 57:15 62:5 131:13 134:5 163:1,2 186:21 206:20 253:21 John 43:18 48:4 54:21 173:20 212:16 213:8 229:21 Johnson 1:19 2:6 2:10 36:10,11,13 63:8 74:12,14 joined 163:22 167:5 168:5 Joining 63:6 joint 49:12 55:14 Joseph 249:3,5 journey 146:22 212:19 Jovanka 2:6 33:9 229:21 judge 41:21 Judith 15:14 July 53:12 113:13 116:16 158:10 161:12 jurisdiction 197:19 jurisdictions 247:4 justice 30:6 31:11 31:11,12 153:7,20 157:11,14,16,18 158:18 159:7,14 160:7 161:4 185:18 186:8 238:18 justify 145:2 K K 6:9 86:7 K-A 245:6 K-A-R-R-A-S 163:12 K-A-T-R-I-N-K-A 245:16 K-E-R-E 238:10 Kaiser 254:20 255:21 Kanawha 21:11 Karras 163:9,11,12 169:5 Katrina 244:21 Katrinka 245:6,7 Katz 227:17,17,18 227:19 231:6 KCRT 147:12 keep 38:16 90:1 178:1 223:19 229:11,12 242:13 259:20,21 keeping 41:1 56:2 Kentasa 151:17,20 151:21 152:1,4,7 Kern 116:12 key 64:5 66:20 68:20,21 69:12 70:5,17 71:10 72:1,7,18 75:3,5 76:3,17 77:9 78:8 79:4,16 80:12 105:2 132:20 139:8 151:10 174:9 187:15 266:6 keys 20:10 kid 186:13 kids 31:16 165:21 Kilbreth 237:20,21 kill 231:17 killed 165:22 243:15 Kim 177:2,3 kind 3:4 183:17 192:21 197:19 241:1 kinds 100:15 127:4 196:18 232:10 234:10 Kingdom 10:9 75:21 82:14 91:11 97:15 98:3,11 101:21 104:22 105:5 149:2,8,11 149:12 176:17 Kingdom's 135:18 know 4:10,20 5:5 16:11 17:6 21:13 27:2 28:14,18,19 30:19 31:1,5,8,17 32:6,8 33:11,22 34:1 38:20 56:17 90:8,11 94:5 95:7 95:21 96:1,6 97:21 100:22 103:1,7 104:15 106:8,9 109:6 110:3,22 118:19 121:14 124:15 125:20 140:16 153:19,22 154:17 155:22 156:12 157:1,7,9 158:12 158:16,20 159:21 160:5,16 162:3,9 162:11,11 163:2 168:1 174:20 175:7 186:9,13,17 192:17 194:11 209:22 210:9,17 214:3 226:16 227:4 233:1 237:15 239:19 240:17 241:8 251:22 252:9

202-234-4433 Neal R. Gross and Co., Inc. Page 294 258:17 259:13 266:17 267:10 268:9 269:19 270:16,18 271:7 271:16 knowing 31:20 knowledge 39:7 72:21 107:3 140:19 knowledgeable 71:17 known 17:8 64:22 75:8 171:5 213:16 L L 238:11 L-D-S 112:8 L-I-N 223:16 L-I-S 226:5 labor 13:2,5,10 14:9 15:15,18,21 41:3 47:15 77:17 86:19 103:1 113:8 117:13 154:13,14 154:19 190:18 192:10 199:2 208:7 249:12 Lac 243:13 lack 76:15 144:8 146:20 lacks 143:22 lagging 83:17 87:1 87:5,10 93:22 183:8 197:7 laid 164:6 language 182:18,20 large 64:18 94:19 129:1 138:21 231:22 largely 78:15 104:13 larger 109:20 205:2 largest 27:7,8 39:15 204:22 late 40:19 165:20 lately 239:4 latest 195:9 Laughter 133:20 204:14 212:5 213:2 241:21 launched 128:1 law 112:8 122:11 192:13 252:2 259:13 laws 157:18 158:18 159:12 160:7 161:4 lay 192:6 layer 121:19 layers 247:21 lays 38:5 lead 1:20 34:8 63:7 97:17 99:7 126:18 126:20 146:18 255:14 leaders 59:12 98:2 leadership 123:22 125:5 207:6 leading 83:17 87:1 87:5,9 131:18 174:8 183:7 197:7 leak 40:1 64:17 65:2 109:12 110:15,18,20 leak/seal 128:2 leaking 40:6 64:20 65:4 leaks 34:21 learn 15:8 learned 15:6 70:9 83:22 143:19 170:16 196:16 learning 170:12 210:21 219:16 learnings 88:8 leave 3:12 211:19 leaves 22:3 161:1 led 14:7 42:22 113:3 115:14 127:2 166:7 left 4:3,16 16:14 40:9 216:3 226:16 238:6 legal 4:11 41:7 84:18 101:6 182:13 194:20 196:22 legally 85:4 legislative 147:20 219:7 legislators 199:16 Legislature 42:10 73:8 82:7 86:17 130:5 lengthy 36:16 91:12 184:7 lessons 70:9 83:22 143:19 170:16 let's 151:14 201:3 261:12 268:10 letter 217:1,3,5 221:22 243:10 245:9 letters 230:9 letting 141:12 222:9 level 43:4 58:13 78:20 87:18,21 96:4 103:9 126:20 150:21 172:13 196:4 246:15,21 247:7 248:9 leveled 14:5 243:14 levels 16:16 46:5 52:14 250:3 265:21,22 Leveson 13:15 216:13 217:1,7 218:10,17 219:21 220:4 liberty 256:11,14 librarian 236:2 Library 236:2 license 224:15 lies 118:15,18 life 150:2 253:17,17 256:11,13 light 43:10 127:4 146:9 limitations 101:11 101:13 limited 44:15 125:19 146:10 216:7 limits 46:15 52:21 Lin 223:13,14,15 223:16 226:1 238:2 line 60:22 156:12 159:15 162:14 200:21 237:15 lines 116:8 linked 124:20 Lionel 184:4 Lipo 151:17,20 152:6 list 85:22 179:19 181:15 270:22 listed 89:7 151:1 listen 9:21 listened 20:1 listening 147:12 160:12 litigate 42:22 litigating 41:20 litigation 17:6 41:9 41:10 225:14 litigious 182:6 little 34:2 36:16 118:10 161:10 216:6 218:2 266:17 270:10 live 165:4,5 246:6 249:6 251:6 255:11 lived 27:12 34:3 186:11 208:20 lives 28:10,17 65:7 168:22 210:18 214:5 227:2 living 197:17 load 235:17 loaning 54:5 lobbiers 199:6 lobbying 233:15 local 6:13 28:15 49:4,8 50:9,18 52:15 53:17 113:9 116:1 125:11 138:9 139:19 156:13 159:10 161:14 168:7 199:9,19 200:7 209:14 230:6 236:18,18 247:4 248:21 locals 188:8 located 139:14 locations 95:8 176:15 192:17 Loeb 1:17 4:13 267:16 268:6 273:6,19,21 274:1 274:6 logic 108:9 logical 44:20 106:9 long 14:9 16:5 19:1 26:19 27:12 29:2 30:5 52:9 91:8 107:13 152:14 183:10 191:19 210:20 212:18 223:19 257:3 long-term 235:5 longer 40:10 Loni 17:15 41:17 look 10:12 20:15 53:11 58:19 90:9 90:13 91:2 110:1 117:11 119:2 120:9 132:4 143:18 149:12,13 173:16 183:20 186:19 187:4 195:1,4,14 196:10 229:18 239:3,17 261:1 looked 11:9 57:8 60:16,20 109:19 150:1 160:21 174:20 230:12 looking 5:7 31:6 58:1 59:6 61:12 90:5 109:6,16 120:5 121:12,16

202-234-4433 Neal R. Gross and Co., Inc. Page 295 121:18 122:18 looks 8:13 9:4 90:16 loophole 42:21 Los 138:12 140:1 193:11 lose 34:14 loss 14:3 19:15 losses 8:15,17 37:7 65:22 lost 14:7 227:2 236:3 255:19 lot 11:2 31:9 32:7 57:1,2 59:8 60:20 62:13 92:20 96:4 105:12 155:4 186:12 188:21 193:20 202:22 212:4 235:7 239:11 259:3,9,16 268:16 lots 60:14 low 29:20 33:17 45:21 46:1 52:8 65:5 69:4 74:9 75:11 76:4 80:5 82:22 178:1 181:2 185:15 lower 225:10 lowest 151:3 lucky 210:20 ludicrous 237:8 239:21 lungs 27:16 Lymphoma 253:7 253:9 M m 1:16 261:16 M-A-R-T-I-N-E-Z 198:8 M-O-N-T 222:7 M.P.H 1:13 ma'am 234:22 MacKerel 238:7,8 238:9,10,13,16 240:8 241:13 Magazine 14:11 magic 14:13 magnitude 3:4 main 114:16 268:4 maintaining 232:1 maintenance 78:12 120:11 126:13 177:9 196:6 228:13 major 19:14 29:19 37:4,14,20,22 45:16 48:17 50:3 52:4 63:16 65:17 66:4 70:9,15 71:8 71:13 73:20 74:5 79:1,10 81:10 82:20 83:15,22 84:13 87:8 88:1 88:10 91:22 92:14 114:3,6 122:11 129:8,10 145:5 158:5,14 170:7 181:20 188:8 196:5 228:16 229:10 256:5 majority 60:2 makers 156:13 makeup 33:16 making 12:22 39:10 42:9 45:4 47:13 53:19 54:13 76:22 77:8 84:2 100:9 106:2 115:13 125:14 136:6 144:5 148:13 184:17 187:18 201:20 244:6 265:3 269:3 MALE 190:6 251:2 manage 111:6 145:18 172:17 178:1 181:2 248:14 259:5,6 managed 81:20 199:1 248:9 management 8:7 9:4,8 10:2,13,17 12:8,10 19:22 20:9,13 25:20 35:10 37:15 38:18 39:2 46:13 49:1 56:5 69:1 79:2 80:22 82:10 83:11 85:7 86:4 87:8 88:18 94:16 115:5 115:7 120:8,9 121:3 124:22 129:17 131:3 134:16,17 139:11 142:17 149:15 151:5 155:8 170:14 171:3,9 175:15 177:19 178:19 179:22 184:22 187:17 195:22 196:13 197:4 198:20 205:11,17,18,22 215:18 221:13 224:3,6 241:1 244:8 252:21 management's 20:5 manager 1:17 125:2 managerial 198:12 managers 141:9 manages 75:1 90:22 Managing 1:16 111:4 180:19 mandate 197:12 221:6 mandatory 265:12 Manhattan 139:20 manner 178:13 Manufacturers 6:21 22:8 manufacturing 142:22 March 40:13 49:6 Mark 1:12 2:4 4:5 market 86:12 170:2 marking 86:13 marrow 253:11,14 Martin 238:7,10 Martinez 198:5,6,7 198:8 201:7 Mary 6:9 Massachusetts 216:17 material 67:18 77:4 114:22 materials 39:4 45:13,18 46:15,22 51:20 52:2 78:22 129:2 133:17 134:6,10 190:1 matter 42:10 137:12,18 183:10 233:17 261:14 274:20 matters 4:12 26:22 48:8 84:21 maximizing 243:17 Mayor 2:5 26:9,10 26:10,13 30:16 33:2 229:20 McCORMICK 1:19 McLaughlin 2:5 26:9,11,13 30:16 33:2 229:20 mean 61:8 107:11 155:3,18 162:8 188:4,7 239:3 240:11 267:1,7 269:22 271:10 272:8 meaning 155:18 meaningful 126:8 141:1 144:8 145:2 174:16 206:21 220:13 224:19 means 32:5 130:6 148:10 196:2 meant 75:16 measurable 87:10 measure 70:16 79:9 121:6 150:19 measured 207:1 measurements 79:8 measures 47:18 79:1 203:4 204:1 264:8 265:11 mechanical 69:10 78:10 109:9 110:7 mechanism 67:9 71:18 77:7 119:21 150:6 mechanisms 19:16 67:10 104:15,19 126:7 media 258:13 medical 4:16 65:10 235:9,15 251:16 252:3,15 medium 134:9 meet 179:6 180:21 200:8 meeting 1:5 3:18 4:12 19:5 26:18 95:9 107:2 115:18 148:1 173:8 187:22 208:11 217:6 274:18,19 meetings 115:19,20 116:11 meets 71:7 Megantic 243:14 Melvin 226:2,4 member 1:12,13 2:3,4 4:4,6 11:21 11:22 17:14 18:19 18:20 26:4 31:2,2 35:14,20 41:16 47:21 48:21 55:13 55:14 89:21 90:1 93:20 95:6 102:14 102:17,18 106:6 112:11 152:7 156:2 202:3 212:19 213:10 214:4 216:22 251:5 262:19,21 263:1 266:20 267:3,13,19 268:3 269:19 271:10 272:4,13,15,21

202-234-4433 Neal R. Gross and Co., Inc. Page 296 273:2,10,16,17,18 273:19,20 274:10 members 1:10 3:20 12:6 27:20,21 36:18 48:10 62:17 64:4 89:19 111:21 112:6 118:3,8,19 119:15 123:19 132:18 134:3 138:10,11 142:5 153:3 170:7 172:19 177:5,11 186:18 191:1 201:1,11,14 207:16 208:6 223:15 226:3 227:19 246:5 265:14 274:15 membership 176:22 mentally 256:7 mention 118:13 127:12 161:6 190:14 194:2 209:16 mentioned 19:5 59:12 98:13 160:11 197:14 217:2 mentioning 206:16 mercury 255:14 mere 45:14 merit 269:22 merits 47:7 Meshkati 20:6 191:17 195:19 message 36:15 213:5 met 113:7 214:5 metal 120:7 208:14 metallurgical 80:16 metallurgists 39:4 metals 255:4,5,12 256:6 method 198:19 methods 82:21 266:2 metrics 90:10 mic 260:4 Michael 22:11 123:13 microphone 33:4 34:6 36:12 55:11 112:4 169:6 238:5 244:19 272:6,10 274:13 Mike 22:14 123:17 192:1 231:6,9 Miller 12:7 36:11 47:21 59:11 60:3 164:6 192:12 202:11 229:22 258:8 Miller's 36:15 million 39:14 45:14 52:1 116:21 117:6 124:18 128:7 161:20 209:12 240:12 millions 168:20 199:8 220:6 mind 111:22 178:14 minded 108:6 minimize 213:22 minimum 76:16 82:16 87:4 264:9 265:20,22 minimums 20:11 minutes 261:12,13 misdemeanor 117:8 128:11 misinterpret 24:20 misses 140:22 mission 142:10 185:14 MIT 13:15 mitigate 71:8 mitigation 172:18 MOCs 68:3 model 13:4 16:9 21:3,3,4,8,11,13 21:22 22:17 24:9 25:17 37:2,20 41:11,12 49:21 84:10,14 133:2 143:18 153:14 157:3 158:12 174:9 195:18 265:1,8 models 50:7 119:3 187:7 modern 133:2 modernization 131:2 158:5,15 modernize 130:18 modernizing 226:8 modifications 83:5 moment 134:1 273:9 momentum 231:2 money 161:21 234:5 236:17 monitor 87:7 201:1 monitored 253:4 monitoring 115:1 254:7,13 257:6,9 Monterrey 222:5,5 222:6,7 223:13 month 113:15 158:8 168:12 months 15:13 40:14 49:18 112:21 113:7 116:17 194:13 256:17 Morawetz 173:21 Morawetz's 175:3 morning 260:16 motion 263:2,7 266:15,18 267:7 267:18,18,21,22 268:2,4,5 271:12 272:3,5,9,14,16 272:22 273:4,8,12 273:13,13,15 274:1,2,4,6,8,9 motion's 267:2 268:4 motions 267:17 268:7 274:7,17 motivated 34:2 Moure 201:10 Moure-Eraso 1:11 2:3 3:3,21 18:18 26:3 33:1 36:8,17 48:2,9 55:4 61:20 62:1,21 89:14,17 102:16 106:7 111:1 117:18 123:18 133:12 134:3 138:1 141:13 152:19 212:2,6 261:10,17 262:20 266:16,21 267:6 268:8 270:13 272:1,7,11 272:17 273:3,22 274:3,14 mouths 62:3 move 29:21 30:8,12 32:10,13,18 59:18 59:19,21 61:8,17 120:14 191:14 195:17 232:9,10 262:3,18 270:4 271:8 moved 236:8 266:18 267:18 movement 30:6 moving 20:10 61:1 61:5,13 119:7 120:3 121:21 123:4 251:11 multi-agency 25:13 78:4 221:4 multi-billion 32:4 multi-disciplinary 264:12 multiple 66:6 115:20 167:19 253:7 municipal 227:20 244:5 myriad 240:18 N N 3:1 185:9 N-A-K-A-S-O-N-E 204:16 N-I-B-A-R-G-E-R 177:4 Naj 191:17 195:19 Nakasone 204:9,12 204:15,15,18 name 33:8 55:12 62:13 63:3 112:2 112:6,7 117:22 118:4,4 123:15 138:7 141:20 152:6 179:21 185:6,7,8 190:10 198:8 201:11 213:8 222:6 227:19 233:21 251:4 255:2 260:6 260:11 name's 134:1 169:14 177:3 241:15 named 93:9 Nancy 13:15 17:14 41:16 216:13 narrow 101:6 NASA 10:14 29:15 74:6 Nat 250:9 Nation 25:12 27:4 Nation's 124:2 national 10:20 133:2 204:21 nationally 129:21 nationwide 148:11 183:22 226:9 natural 142:5 170:3 201:8,13 near 24:4 25:21 43:1 140:22 197:18 near-miss 265:17 near-term 23:7 38:8 47:19 54:19 nearby 260:21 nearly 28:17 39:13 39:14 40:21 182:7

202-234-4433 Neal R. Gross and Co., Inc. Page 297 necessarily 99:22 100:2 necessary 3:10 12:5 32:12 83:6 86:10 125:14 136:6 156:18,18 200:19 211:5 need 16:5,15 18:14 21:13,14 44:6 45:11 46:6 47:20 52:10,13 56:20 57:17 58:19 64:14 84:1 114:16,16 115:2,8,10 119:20 122:1 131:1,13 137:9,11 140:4 156:16,17 162:4 165:6 181:16 192:2 194:15,16 194:20 195:12 202:5,22 210:1 211:5,14 220:2 224:2,16 236:20 236:21 239:17 240:19,19 242:11 242:20 243:18 246:20 257:5,8 262:17 268:16,19 needed 22:6 23:13 29:1 30:7 51:19 52:16 84:5 114:22 115:3 144:1 226:20 237:15 251:10 needless 42:22 needs 22:15 24:13 25:4,5 29:15,21 34:13 48:17 57:2 57:7 58:5,10 77:20 119:12 137:1 146:16 156:19 182:14 205:22 220:10 224:9 233:11,12 248:9 negates 274:4 neglected 205:11 neglects 35:5 negligence 199:21 226:17 negotiations 15:17 Neighbor 57:12 neighboring 139:20 186:5 neighbors 170:11 net 231:14 Network 151:19 185:5,11 Nevada 138:11 170:5 never 31:20 67:14 67:20 224:2 new 9:3 10:5 12:14 15:2,3 30:6 37:11 42:11 46:12 73:9 73:15 81:14 84:1 84:3 88:8 107:8 140:22 143:10 144:3 146:13 148:4,15 172:4,8 191:7 195:9 224:18 250:4 newly 69:15 70:11 83:20 news 34:21 Nibarger 177:2,3,4 184:4 nice 13:3 153:2 Nicole 189:22 night 165:21 Nimrod 14:4 nine 52:4 113:7 115:21 128:4 nipped 159:9 non 204:21 non-profit 169:22 258:12 non-specific 269:9 non-union 174:14 175:1 176:14 265:13 nonsense 155:1 156:10 163:6 noon 256:1 normal 3:12 North 158:2 159:19 161:22 210:11 243:8 Norway 10:9 82:14 90:18,19 91:1 97:14 101:22 104:22 132:12 144:3 175:8 176:1 176:1,17 notably 243:13 note 38:8 93:15 144:2 145:6 193:6 202:2 203:18 234:1 noted 20:7 74:15 77:20 90:19 91:18 103:19 132:18 150:14 178:8 203:6 notes 89:6 146:6 148:12 184:18,20 noteworthy 168:13 notice 144:5 noticed 162:1 notifying 222:13 noting 37:7 243:2 NRDC 205:3 NSTB/FAA 143:18 NTSB 210:16 nub 165:16 nuclear 10:13 29:14 74:6 number 8:5,8 23:12 40:20 55:19 69:19 72:20 82:6 86:9 86:16 88:12 90:6 91:18,20 97:14,17 99:6,18 100:15 105:13 106:19,22 109:20 111:10 136:1 138:21 142:13 145:14 149:5 150:8 178:6 189:5 216:10 220:8 228:18 262:4 numbering 168:20 numbers 91:1,9 258:20 numerous 14:2 67:11 218:15 251:15 O O 3:1 O'Connor 6:9 O'Neill 14:9,15 O-F 2:1 Oakland 185:16 Obama 132:5 160:14 221:2 Obama's 132:1 objective 5:9 37:6 133:1 144:12 215:22 217:8 236:19 obligated 17:4 41:4 obligation 178:12 observe 189:1 observes 218:14 obstacles 24:17 25:8 obtain 224:19 obtaining 179:13 obvious 22:13 obviously 57:15 60:12 94:20 108:20 112:15 119:19 122:11 176:17 189:19 OCAW 196:16 occasions 194:8 Occupational 88:14 190:18 occur 68:18 76:14 119:16 129:9 156:10 252:5 occurred 29:9 65:3 65:17 66:16 107:18 110:15,22 135:21 139:18 150:21 184:20 254:10 occurrence 73:22 occurring 18:12 92:21 189:5 206:2 214:17 October 42:13 odd 218:19 oddball 241:2 odds 42:18 offered 124:9 218:2 offers 13:21 218:12 office 1:18 4:15 36:10 43:9 44:11 62:11 63:4 113:4 125:3 192:18 202:12 259:1 officer 1:19 134:6 officers 179:10 192:19 offices 63:4 official 48:3 161:9 officially 7:10 officials 2:5 26:6 32:15 43:19 45:19 47:1 49:13 51:21 55:8 106:22 166:8 186:20 209:22 214:12 220:16 229:20 offshore 13:12 37:21 90:12,20,22 91:13,15,17 92:13 92:17,19,19 93:2 93:7,10,18 94:1 95:16 96:2 144:15 144:18 176:1 Oh 169:7 190:8 207:13 238:12 245:4 oil 13:12 20:8 26:22 27:7 28:1 29:15 30:9 37:5,21 38:1 91:15 93:16 94:13 98:10 113:13 130:11 142:4 165:2 167:18,22 168:22 177:12 182:2 184:14

202-234-4433 Neal R. Gross and Co., Inc. Page 298 190:16 198:17 199:4 204:2 223:2 225:10 234:4 239:7 242:22 243:8 244:10 oils 203:15 222:17 okay 96:15 102:18 111:7,13 151:12 151:22 152:2 153:12 155:1 157:11,22 222:4 226:21 238:1,6,15 244:20 245:4,11 261:17 262:20 272:17,18 273:3 274:14 old 55:8 131:4 166:3 185:14 222:18 226:13 oldest 153:7 on-site 219:17 once 18:22 76:1 133:9 208:16 212:12 257:10 271:13,14 ones 3:17 31:14,15 32:1 109:18 140:21 237:14 ongoing 8:21 114:5 159:16 160:9 online 78:21 97:10 147:19 onshore 13:14 90:22 91:2,16,20 91:21 92:4,17 93:10 144:15 149:7 onsite 232:17 233:1 OP 194:10 open 25:18 170:9 opening 2:2 11:21 operate 37:18 75:20 156:15 170:7 178:13 214:14 224:16 266:5 operates 72:6 operating 45:20 51:22 132:11 196:3 operation 34:13 40:7 257:6,8 266:8 operational 130:15 265:3 operations 65:1 120:11 144:18 146:4 147:8 170:9 196:7 234:11 operator 146:2 147:6 150:17 151:2 operators 46:11 65:8 76:6 87:2 177:9 180:4 221:8 opinion 43:2 161:2 167:11 199:6 225:3 267:14 opinions 57:5 216:8 218:3,6 opportunities 11:4 38:9 43:13 50:9 opportunity 25:10 36:14 54:17 64:9 95:20 112:14,20 142:1 169:18 213:13 221:18 245:22 oppose 12:18 221:15 opposed 53:6 opposite 24:22 opposition 174:19 optional 265:13 options 23:8 24:6 46:5 89:8 order 25:14 43:7 88:9,21 89:9 132:2,7 157:13,16 157:19 160:14 183:16 195:20 206:1 221:3 262:14,16 268:9 274:12 ordered 40:12 orders 166:22 194:10 ordinance 21:17 30:18,22 31:5,6 35:15 43:4,11,17 44:8 47:17 49:9 50:10,15,19 52:21 57:9,12,14 60:17 60:19,19 134:18 135:3,4,6,9 136:3 136:13 173:2 182:1 190:21 211:12 248:5 263:22 ordinances 134:12 134:13 Oregon 41:12 170:5 192:14 195:5 organization 105:6 106:17 185:13 228:1 246:4 organizational 20:17 67:15 120:10 198:13 organizationally 129:7 organizations 26:16 153:8 198:9 organize 185:15 organizer 185:10 204:19 241:17 organizers 27:20 OSHA 6:7,7 9:1 15:15 17:13 25:15 25:18 69:20 79:6 88:22 105:22 109:19 129:21 132:1 134:15 142:16 143:4,6 145:7 146:16 167:6 177:19 179:8 181:22 182:8 193:13 195:2 220:20 262:12 OSHA's 88:20 183:18 193:17 outcome 74:2 246:22 outcomes 207:1 outline 9:20 outlined 173:5 192:1 outside 9:13 64:3 232:21 outstanding 270:5 outweigh 220:18 over-burden 235:21 overall 100:7 155:15 157:10 176:13 191:9 overhaul 142:18 155:15 171:16 247:18 overlay 172:4 overload 235:22 overlooking 157:5 overly 76:15 overseeing 128:21 overseen 125:1 oversees 124:16 oversight 63:13 73:1 114:1,19 129:14 130:7 171:8 206:19 248:16 263:12 overstate 124:12 overstated 96:11 owners 76:5 141:9 221:8 ownership 247:16 P P 3:1 8:10 P-A-R-K 231:9 p.m 3:2 261:15 pablum 249:19 Pacific 151:18 185:5,10 Page 165:11 pages 269:12 270:19 paid 58:8 161:19 209:13 233:4 panel 3:21 13:17 182:22 216:22 264:12,13,20 266:10 paper 14:7,17 60:12 179:21 paper-thin 39:11 papers 217:16 parallel 208:17 parcel 151:9 parent 196:4 parents 260:18 parity 187:16 Parker 231:7,8,9,9 234:15 236:16 parks 222:21 part 23:22 47:3,15 58:20 62:2 96:22 110:2 125:21 132:1 134:21 151:9 153:19 154:9,20 156:1 166:4,10 167:11 167:15 168:15,19 174:11 239:15 249:10 253:16 256:5 265:8 268:20,21 270:1 PARTICIPANT 190:6 234:12 240:6 251:2 participants 113:6 participate 172:14 248:19 participated 103:7 participating 125:5 175:14 196:8 participation 77:11 77:16 85:16 98:17 100:1 101:22 103:11,15 104:19 126:8 164:16 175:18 224:20 225:7,15

202-234-4433 Neal R. Gross and Co., Inc. Page 299 participatory 225:4 particular 11:17 37:22 144:7 151:6 191:16 242:7 particularly 43:21 92:18 202:10 209:6 244:6 parties 13:4 189:1 partly 236:6 partner 205:4 partners 115:22 128:14 parts 57:14 pass 208:13 passed 17:15 41:17 passes 274:2 patched 162:10 path 25:22 126:16 126:18 pause 15:7 138:6 251:3 pay 56:10,12,14 58:5,10 117:6 paying 231:13 PEC 222:10 penalties 116:21 128:8 pending 42:18 107:6 penny 208:8 people 3:20 5:19 33:12,17 34:13 35:1,22 56:2,10 57:4 58:12,14 59:11,22 62:3 83:14 90:3 108:3 110:17 111:10,11 120:7 149:5,19 154:12,21 156:13 157:20 160:1,10 161:14 162:7,20 163:3,4 189:20 193:10 197:17 227:1 232:16,22 233:11 234:8,9 235:14,20 236:4 243:15 251:16,19 257:4 261:2 perceived 85:13 percent 19:14 38:21 175:7,9,10 perfect 146:6,7 181:17 perfecting 231:16 perfectly 270:22 perform 67:8 135:1 228:13 performance 46:12 50:1 68:11 70:15 90:9 131:10 133:5 144:10,14 179:7 216:2 264:21 265:18 performed 180:3 performers 87:16 performing 179:11 performs 145:8,10 period 5:18 91:12 113:7 149:20 159:16,19 162:13 162:21 163:5 188:9 256:21 267:5 periodic 120:22 periodically 86:12 88:7 permanent 155:9 permanently 138:22 permission 72:5 184:9 permissioning 145:11 permissive 76:15 permit 244:9,10 permits 30:9,13 156:14 200:1,3 persistent 184:5 209:1 person 26:8 33:3 55:7 154:15 personal 79:8 216:8 218:3,5 personally 270:20 personnel 65:1 73:4 83:4 140:9 206:17 264:4 perspective 110:4,5 189:10 perspectives 191:7 pervasive 39:22 Petrochemical 6:21 petroleum 6:12,22 7:21 10:3 22:7 63:13 65:13,16 69:13 70:6 73:1 73:16,21 78:6 82:10 86:15,19 134:8 141:17,22 169:16,21 170:3,3 170:18 178:7 223:9 PG&E 222:18 Ph.D 1:11,16 PHA 71:2,6,19 72:16 196:17 phalanx 208:14 PHAs 72:13 78:11 150:19 196:9,20 phase 92:3 111:3 Phillips 179:3 phone 258:20 phonetic 59:8 67:4 151:17,20 152:5 192:15 194:11 213:7 223:22 249:3 250:18,19 261:19 physical 179:21 254:22 physically 256:7 piece 109:6 179:21 pieces 119:17 122:9 piles 14:17 Pillao 249:3,4,5,5 250:17 pinpointing 197:2 pipe 12:7 39:21 40:2,12 64:17,20 65:4 114:11 124:6 127:22 139:9,11 166:6 226:11 pipelines 210:13 pipes 12:3 40:6,16 162:10 243:7 255:8 piping 38:21 39:11 67:4 109:7 128:13 128:17 138:21 Pittsburgh 211:14 222:10,11 223:5 242:15 place 7:22 19:3 20:15 27:18 37:15 40:10 41:2 43:7 68:12 79:21 80:14 91:8,22 92:10 94:2,4 131:18 180:13 182:6 191:14 199:22 224:2 233:8 254:8 265:11 270:7 places 33:12 265:13 placing 110:17 plan 16:5 56:1 82:9 89:1 92:9 108:14 110:6 149:16 157:7 177:20 181:1 195:8 241:5 planned 81:19 planning 116:10 210:10 plans 115:1 116:7 178:11 179:6 180:21 181:5 plant 19:16 93:5 104:14 126:12 140:20 149:18,21 150:2 165:22 222:18 plant's 126:6 plants 94:14,22 103:9 148:11 177:15 182:3 193:16 196:3 197:18 232:16 plaques 211:21 213:5 230:17 plate 241:3 platform 93:3 platforms 37:21 play 84:11 256:5 playing 159:21 162:17,18 247:10 plays 77:22 plea 117:3 pleaded 117:7 Pleasanton 43:1 please 24:20 32:8 111:5 112:2 117:22 123:15 152:3 169:1,8 185:6 225:19 238:20 254:5 261:13,19 273:5 pleased 43:14 47:8 pleasure 213:11 plume 28:19 plus 45:16 155:13 point 38:4 106:22 146:20 156:22 157:4 160:11 161:5 191:12 193:1 241:20 258:4 pointed 103:21 243:10 points 67:14 96:16 223:20 police 58:20 policies 39:20 114:10 157:22 policy 141:21 193:7 193:12 199:6 204:19 political 56:9 209:7 233:9 234:3 250:2 250:8,11 politics 231:11 polluted 252:13 254:3 polluting 27:13 257:1 pollution 116:2 159:2 160:9

202-234-4433 Neal R. Gross and Co., Inc. Page 300 208:22 209:1,1 261:2 pony 159:22 poor 14:1 87:16 populated 129:5 port 235:19 position 271:18,19 271:21 positions 46:1,2 52:10 73:9 174:19 176:10 positive 12:19 176:13 210:6 possibility 15:3 possible 8:3 19:1 21:14 23:14 37:2 48:20 61:16 97:22 107:8 126:20 131:12 136:21 252:5 possibly 123:8 postpone 263:2,8 266:15,22 267:4 267:11 269:15 271:12,19 273:13 273:16 274:1 postponing 42:1 potential 25:7 52:18 79:1,9 110:9 132:16 140:13 143:7,16 172:4 180:5,9 218:22 219:3 potentially 74:1 88:19 127:16 140:21 pound 249:13 pour 37:8 power 13:5,9 58:21 80:3 94:22 103:3 104:5,6,8,10,12 159:10 163:3,3,4 165:2 176:21 187:16 199:14 200:10 234:3 240:4,10 practicable 29:21 69:4 74:10 75:11 76:5 80:6 83:1 121:13 178:2 181:3 practice 15:10 18:11 76:11,13 106:16 160:22 practices 23:17 47:2 53:5 75:2 76:15 84:4,8 85:17 113:18 114:6 178:4,5 198:17,20 202:19 264:8 pre-school 260:7 precautionary 159:6 160:6 precedence 271:13 precisely 5:6 precursor 57:11 preempts 274:8 preferred 150:5 preliminary 91:1 preparation 62:7 95:9 147:5 prepare 75:7 preparedness 114:2,21 116:5 prerequisite 164:8 prescriptive 179:9 presence 27:11 258:12 present 1:10,15 64:5 209:21 211:21 presentation 55:6 62:18,22 63:1 64:4 66:19 68:6 74:11 82:1 89:12 89:18 95:14 174:3 174:7 presentations 4:19 presented 5:17 7:10 9:10 106:21 107:9 108:3 153:15 170:20 209:19 210:22 268:13 presenting 11:9 62:6 63:9 presents 17:7 54:17 85:13 210:14 President 132:1 157:12,18 160:14 221:2 Presidential 93:16 press 5:7,9 60:7 pressure 92:22 129:3 252:16 pretty 58:4 153:15 179:15 235:8 prevent 10:22 18:12 37:4 69:7 76:16 88:19 123:5 136:20 148:5,16 189:4,12 206:1 213:21 214:16 215:11 228:11 preventable 137:3 preventative 29:22 32:6 83:7 prevented 20:2 228:15 preventing 19:2 71:6 73:20 84:13 137:16 206:22 215:16 prevention 29:17 52:7 71:13 72:7 87:9,14 88:2 91:22 114:6 115:3 115:6 116:6 119:18 134:15 137:6 139:5 191:8 237:11 previous 16:13 40:10 103:21 previously 190:15 pride 212:4 primarily 19:15 69:2 79:6 primary 113:3 prime 57:7 principle 159:7 160:6 principles 10:7,11 10:14 82:12 215:3 prior 38:13 42:7 60:13 67:21 72:5 83:6 109:13 224:12 236:15 priorities 106:14 126:7 127:11 172:3 prioritize 133:4 priority 127:14 128:19 130:21 prison 31:19 proactive 11:13 49:3 203:1 probably 90:2 164:5 235:13 260:17 probation 128:10 problem 7:15,18 8:19 16:22 19:21 35:4 56:20 60:18 154:1 157:10 165:2 197:3 225:16 234:1 249:22 250:2 266:17 problems 3:5,6,7 9:7 27:1 28:12 65:12 103:22 107:20 113:18 114:12 166:19 197:2 231:20 procedural 267:3 268:4 272:5,9,22 273:4 procedure 150:13 251:12 253:15 273:7 procedures 35:17 39:1,22 40:1 103:15 114:10 120:9 272:19 proceed 4:22 62:18 259:8 261:22 273:17 proceeding 116:15 process 6:9,18 7:20 9:3,7 13:22 17:13 21:20 24:10 25:11 25:20 35:8 39:11 41:14 43:22 56:5 65:15 67:17 68:5 68:7,16,18,22 69:9,19 71:1,2,22 73:10,14 74:15,22 78:4 79:5,10 81:8 81:14 83:17 85:6 85:22 86:2,22 87:6,7,13,22 88:18 90:7 93:4,5 94:15 100:22 101:4 108:20 109:8 110:5,10 114:12 115:4 116:14 119:13,22 124:2,9,22 128:21 129:16 130:1,18 131:1,3,5 134:15 142:17 151:4 156:3,17 170:13 171:3 173:13 177:19 178:19 180:7 183:10 184:21 194:6 203:22 205:18,21 212:17 213:18,22 214:16 215:16,18 217:11 218:13 219:13 221:12 232:6,8 233:1 237:2 247:15 248:19 249:10 264:17,20 265:18 processed 135:2 processes 38:6 135:2 148:7,11,18 172:17 processing 91:16 200:10 produce 170:2 produced 1:22 105:12

202-234-4433 Neal R. Gross and Co., Inc. Page 301 produces 144:9 product 222:13 production 8:13 91:16 92:18 93:3 93:18 130:12 177:13 240:4,13 products 170:3 professional 52:3 professionalism 58:13 133:10 professor 13:16 22:11 174:8 216:15,16 profit 204:22 243:17 profits 208:3,5 233:21 program 8:7 9:3,9 16:9,12 35:11 43:12 44:3,19 45:13,19 46:15 47:1 51:13,20 52:2,7,17 78:5 87:4 91:21 92:1,4 92:10 94:8,13,16 115:5,7 116:1 128:2 129:21 134:15 143:17 146:14 147:4 171:9 172:6 179:20 190:2,18 192:16 221:13 248:14 program's 92:13 programs 38:11 84:5 94:2,4 115:6 124:16 137:6 139:5 145:6 146:13 172:16 192:19 219:14 248:16 progress 11:16 57:18 70:16 progressive 28:22 31:9 198:6 207:12 231:7 234:21 237:21 prohibited 256:18 prohibiting 194:10 project 81:11 158:6 158:9 166:14 167:2 211:15 222:14 223:2 projects 30:9,11 167:19 168:8 200:2 promising 61:4 promote 70:14 87:2 216:4 promotes 217:11 promoting 217:17 prompted 64:15 pronunciation 151:17 proper 251:19 properly 9:11 52:16 74:22 141:6 224:6 proponent 174:9 proportion 130:11 proposal 120:20 154:8,22 271:8 proposals 242:17 246:13 propose 23:3 64:13 267:7 268:21 proposed 2:11 64:7 72:5,16 82:2 163:19 172:11 177:21 proposes 63:14 82:4 166:14 proposing 12:12 136:21 219:1 270:18 272:2,9 proposition 23:6 proprietary 177:9 236:11 protect 11:14 18:15 33:20 36:1 83:14 156:19 157:2 168:21 186:21 197:17 232:15,19 242:5 244:2 protected 229:13 229:17 233:2 protecting 124:17 126:21 131:14 protection 13:21 42:19 48:15 112:10 117:9 121:20 123:5 162:16 206:20 218:13 protections 47:19 186:8 protective 265:11 protects 35:7 protest 184:16 proud 56:21 130:1 187:1 212:9 provide 13:3 25:21 38:3 46:21 47:19 60:10 72:22 94:6 94:11 103:16 131:8,11 141:12 142:1 147:17 154:18 197:9 264:15 provided 1:22 43:14 140:13 255:7 provides 21:21 77:12 providing 169:17 185:21 202:16 231:1 provisions 51:8 153:17 202:21 proximity 34:12 129:5 PSAs 90:21 PSM 25:19 69:6,9 70:3,21 73:12 95:4 119:8 121:15 125:4 127:20 128:20 129:18,22 130:3,16 131:11 131:16,21 132:20 142:18,20 143:5,8 143:9,14,17,22 144:10 146:14,18 147:2 171:9 172:6 172:15 173:3 177:19 178:3,8 179:7,8 180:22 181:9,13 182:20 183:3,18 190:17 191:14 194:5,18 194:22 195:11 197:19 220:21 public 1:5 2:16 5:11 11:14 13:19 15:5,11,19 17:8 18:15 26:18 42:19 64:11 78:1,6,13 78:14 79:13 85:20 89:10 90:3 97:5 99:15 100:16,20 111:3,6 113:12,22 115:12 116:10 122:21 156:20 157:2 164:16 166:8 187:22 199:6 216:19 227:22 231:13,18 234:6 236:2,12 259:13,19 263:5 265:16,19 public@csb.gov 147:15 publicly 78:19 87:19 90:7 95:14 119:14 publish 87:16 91:9 published 78:21 97:10 pull 31:15 180:1 pure 226:16 purpose 214:21 246:17 pursuant 128:10 pursue 59:5 pursuing 172:7 248:21 pursuit 256:11 purview 149:15 push 179:12 240:9 pushing 200:18 put 23:8 34:22 37:14 40:15 62:4 91:21,22 94:2,4 109:13 120:20 131:18 141:7 160:22 162:4 165:11 182:14 208:3,5 227:8 234:1 270:6 putting 109:6 159:22 160:10 162:20 puzzling 39:7 Q qualified 23:12 46:8 58:9 80:14 202:17 264:4 quality 48:22 72:15 155:7 225:10 240:22 244:8 256:13 quantities 129:2 question 23:1 55:10 58:8 59:14 95:7 96:21 99:9 106:8 106:9 107:16 110:2 111:2 136:19,22 137:1 141:3 148:3,21 168:17 173:20 174:5 175:3 187:11 188:1 209:7 217:18 questions 2:14 20:17 22:3 40:20 64:10 89:13,19,22 100:16 126:5,14 127:4 264:18 270:3,5 quick 60:22 223:20 quickly 16:22 quite 24:22 60:3 90:2 155:3 207:5 213:6 quo 203:5,12,12

202-234-4433 Neal R. Gross and Co., Inc. Page 302 232:1 quote 165:10 R R 3:1 8:10 222:4 R-E-Y-N-O 112:7 R-U-K 245:17,18 R23 262:11 RAF 14:4 Rafael 1:11 2:3 3:21 RAGAGEP 178:5 rail 210:12 222:17 223:4 rained 27:15 raise 46:11 52:16 104:5,7 174:17 raised 42:12 89:2 92:15 108:4,12 140:6 163:18 192:12 193:18 230:3 232:11 263:4 264:18 raises 22:22 raising 136:19 186:16 rally 186:1 Ramon 208:12 Randy 133:15 134:1 138:2 155:11 rapid 242:21 rapidly 14:18 183:18 242:13 rare 44:13 rate 28:5 65:6 139:2 174:21 175:6,8 240:16 254:16 rates 35:2 79:7 re-examine 50:5 re-introduce 17:18 reach 113:19 173:11 reactions 212:7 reactive 29:22 203:2 243:20 reactively 72:10 read 5:1 82:1 147:16 273:16 readily 171:22 reading 2:11 174:7 ready 57:7 59:15 60:1,3,4 173:7 191:21 real 13:7 14:8 100:1 103:16 113:21 156:11 160:4 185:21 192:2 195:8 219:2 224:19 225:16 230:21,22 236:22 251:13 reality 34:8 56:8 231:17 realize 35:20 really 12:8 15:18 33:8 34:9 55:21 56:11 60:7 96:6 118:21 120:17 156:3 157:9 164:22 165:1 191:4 192:14,20 193:8,22 194:13 194:15 195:12 202:4,22 203:21 207:4,20 208:17 210:5 211:7 223:20 226:20 231:11 233:17 234:7,10 239:14 239:16 240:2,18 241:2,3 reason 93:21 139:22 271:4 reasonable 16:16 23:15 reasonably 29:20 69:4 74:10 75:11 76:5 80:6 82:22 121:13 178:2 reasons 7:14 121:17 168:14 188:22 218:16 221:14 242:3 receive 100:14 147:19 received 6:5 22:4 96:22 212:9 251:19 264:19 recognize 98:19 128:21 130:22 149:20 214:15 recognized 85:4 102:6 104:6 178:4 recognizes 144:17 recognizing 205:10 206:6 recommend 15:21 102:7,9 148:15 182:21 192:9 218:9 227:9 recommendation 9:1 10:18 16:21 45:7,9 58:16 82:6 86:16 88:12 102:13 120:4 142:14 152:11,15 152:16 164:12 174:11 182:22 183:7,13 184:17 185:2 192:21 193:2,5 195:17 213:15 216:12 220:3,14 221:15 223:1 225:20 232:5 248:20 262:7,9,12 267:4 recommendations 2:8,11 5:13 7:12 9:22 11:17 16:13 17:1 18:2 20:19 21:10,15 23:20 30:3 32:19 39:3 42:9 43:16,20 44:4,16 45:4 46:4 46:21 47:12,14 48:13 49:4,7,15 50:11,22 51:10 52:13 53:2,13 54:14,18 55:16 57:19 61:14 64:7 64:13 67:12 69:20 70:1 82:2,5 89:4 96:18 98:21 99:1 99:5,14 100:9 101:12,13 106:2 106:13,17,20,21 107:9,13 110:9 115:15,16 119:5 136:2,7,11 142:8 160:21 163:20 164:2 171:2,7 178:16 184:13 185:22 187:4 192:5 196:10,14 196:19 198:16 199:12 201:17 202:8,9 205:13,19 206:13 211:4,6 214:22 215:11,13 226:8,9,11,13 227:8,12 228:4 229:19 230:1 237:13,16 242:8 247:3,12 248:3 249:18 250:12 262:6 263:11 268:14,22 269:2 269:10,20,21 271:6 273:10 recommended 28:22 30:2 78:3 121:9 140:2 148:4 148:18 164:5 205:16 209:10 272:20 recommending 29:11 35:9 58:22 93:17 reconvene 261:12 record 147:18 184:10 209:13 217:6 255:18 261:15,16 267:15 recordable 79:7 recorded 235:12 records 78:9 recurrence 215:11 red 39:9 reduce 63:16 67:21 69:8 70:16 76:7 82:22 86:2 140:3 254:22 reduced 29:20 37:20 38:1 46:19 75:10 80:5 256:13 reducing 241:6 reduction 69:3 73:19 74:8 75:18 76:4 77:19 224:9 264:8 refer 16:19 155:16 reference 218:5 254:11 referencing 206:3 referred 14:13 44:10 51:6 154:11 155:2 refers 262:8,10,12 refine 170:2 refineries 7:21 8:4 8:16,18,19,22 9:4 9:5,9,17 10:3 19:7 24:3,4 35:11 37:5 37:8 38:1 40:5 45:20 47:1 48:16 51:22 53:4 56:9 63:13 65:13,16,19 69:13 70:6 73:1 73:21 78:6 82:11 86:15 90:10,14 94:14 95:21 113:13 114:19 117:15 120:1 121:9 128:3,4 130:7 132:11 133:3 134:8 138:12 139:3 144:20 155:16 168:5 170:8 174:22 175:6 177:14 180:18 182:2 193:15 197:18 202:18

202-234-4433 Neal R. Gross and Co., Inc. Page 303 203:21 208:20 224:15 226:8 264:17 265:1 refiners 179:5,12 181:4 183:22 184:14 refinery 1:3 7:1,17 8:8 10:6,21 11:4 16:9 19:10 20:8 27:6,7 29:4,9 30:12 34:3 35:8 47:9 49:22 50:3 50:12 53:9,11,14 53:15 63:1 64:19 65:22 66:4,7,10 66:13,16 67:5,10 73:4 78:10 93:22 112:11,15 113:1 114:1,6,11 115:16 118:8 125:6 127:19 131:19 135:3 136:15 137:7 138:14,16 138:18 139:13,14 154:1,5 155:10 160:18 162:8 163:22 166:20 168:6,18 177:10 179:4 184:19 186:5,12 194:12 196:17 201:14,21 203:1,7,16 205:5 224:1 228:16 235:18 243:21 255:6,10 refinery's 130:10 refining 73:16 86:19 92:19 178:20 225:10 reflect 68:8 reflected 63:21 114:5 reflection 3:4 109:21 reflects 81:14 reform 23:2 26:1 89:8 176:13 192:10 reforms 25:10 38:7 47:6 219:3 refugee 185:15 refurbish 222:15 regard 21:19 24:14 90:10 91:10 153:14 155:4 215:14 265:4 regarded 33:14 216:10 regarding 25:19 43:16 46:4 48:13 50:22 52:13 143:7 213:14 218:3 239:2 247:11 264:16 regardless 32:11 56:1 regime 10:6,11,19 12:13,15,17,20 13:5,8 14:6,6 15:4 15:9 16:2,5 18:5 23:2,3,14,19 24:18 29:12 30:13 30:22 38:2 42:14 49:22 54:2 59:15 61:3,19 63:15 73:18 74:13 75:4 76:18 77:2,10,12 79:5,11,17 80:13 80:19 81:7,10,19 88:17 89:5 91:5 93:10 98:8,12 99:20 100:7 103:3 103:14 122:3,9 132:15 137:10 175:15 187:2 195:15 198:18 200:13,14,18 216:4 217:19 218:4 223:1,3,6 224:6,18 232:20 239:3,20 242:4,11 243:19 244:11 246:13 247:19 250:11 265:6 regimen 171:4 regimes 18:11 22:10 68:22 69:13 70:6,13,18 71:11 72:2,19 78:16 82:13 95:8 96:10 120:18 144:22 193:21 217:18 220:12 266:9 region 211:2 regional 1:18 63:4 244:5 247:4 regret 36:19 regrets 48:6 Regrettably 42:4 regs 120:14 regular 134:18 regularly 142:7 regulate 74:5 165:14 241:4 regulated 9:18 141:7 179:8 184:14 regulation 10:6,21 58:7 73:13,13 182:2 202:5 231:10 232:12,21 233:8 239:13 241:8 243:21 247:21 254:4 regulations 16:4 21:21 44:19 46:16 49:5 51:14 52:20 52:22 53:20 70:4 70:22 72:10 84:16 84:18 115:7,9 116:9 119:9 121:15 130:13 131:1 142:17 144:4 159:11 163:1 172:5 177:17 206:8 236:21 242:13,20 regulator 13:1 23:16 37:13 72:3 72:9,14,14 74:18 74:21 75:22 76:8 76:12,20 77:17 79:21 80:3,7,14 80:20,22 81:3 84:10 85:14,18 86:6,8,11,18 92:11 102:6,11 104:7,9 105:8 145:7,8,10,12 155:2,17 180:1 229:2,8 236:19 regulators 16:3 38:16 46:10 73:3 75:18 77:3,5 79:12,19 83:8 140:18 141:5 145:16 156:5 165:13 172:13 188:16 200:6,9 216:5 220:8,17 224:22 225:5 233:3,10,18 240:4 266:2 regulatory 9:15 10:2,8,14 11:5 12:13 19:17 20:12 20:15,19 21:18 22:9,17,22 23:2,4 23:9,21 25:17 29:14 35:6 37:3 42:7 44:5 47:13 49:21 50:6 54:19 63:10,12,15 64:12 64:14 66:21 67:7 68:8,11,16,20 69:13 70:6 71:7 74:4,7 77:2,10 78:5 79:17 82:10 82:13 83:4 84:14 88:5 90:21 104:6 104:15 106:1 120:21 121:18 122:13 125:15 129:14 130:7 132:8 133:2 137:13,18 140:9 140:22 142:2 143:11 144:4,14 144:21 145:1,3,6 146:7,13 154:2 155:4,19 156:6 168:2 169:20 171:3,4,8,10,17 171:18 172:6,8 186:19 187:19 193:21 199:1 210:2 214:18 215:17 216:1,4 217:9 218:1 220:12 224:5,18 241:2 242:11 243:19 246:8,19 247:17 264:9,16 264:22 266:14 269:21 regulatotry 8:1 reinforce 211:7 reject 72:3 79:20 80:2,4 rejected 154:8 relate 4:12 110:9 related 26:22 69:19 78:9,12 84:21 85:2 94:7 107:22 110:10 142:14 193:1 223:2 relates 144:18 relating 63:12 relation 108:8 relations 13:9 123:14,21 124:16 127:10 176:8 relationships 171:13 relatively 129:8 224:13 relatives 254:2 release 43:10 44:19 51:13 52:7 79:13 109:11 110:22 113:14 115:6 released 5:5 91:3 101:1 243:11 258:19 releases 37:5 48:18

202-234-4433 Neal R. Gross and Co., Inc. Page 304 56:14 90:20 91:14 91:19 93:2 117:16 119:11 142:12 214:2 releasing 5:10 relevant 7:7 34:10 86:20 88:20 144:22 154:3 reliable 170:9 relies 79:7 rely 68:22 relying 150:12 remain 39:12 remains 39:7 86:14 remarks 5:4 11:21 133:8 remedied 180:6 remedies 16:6,14 18:1,14 remedy 254:6 remember 59:7 136:14 225:7 remind 147:11 remiss 38:7 remove 110:21 removing 110:6 reorganization 120:11 repair 40:1 78:11 repaired 138:22 repairs 40:5 138:21 repeat 193:7,12 repeated 19:21 repeatedly 193:18 205:11 repeating 55:21 repeats 242:18 replace 39:21 40:2 40:18 67:12 171:2 203:2 replaced 12:5 40:13,17 57:12 109:18 167:8 replaces 224:13 report 2:19 5:6,10 5:12,13 6:3 7:8,9 7:13 8:12 9:12,14 9:16,20 11:15,18 15:2 16:13 18:3 20:16 21:6,18 22:2,14 24:15 25:4,5,21 38:5,12 38:14 42:8 43:17 44:5 45:21 47:13 49:20 50:20,21 53:12,18,21 54:13 54:16 60:9 62:19 63:10,11,18,21 64:13 66:21 75:9 75:12,19,22 76:9 77:21 78:18 80:2 80:4,10 81:12,15 82:15 83:3 85:6 85:22 87:20 88:16 89:4,20 90:15,16 92:10 95:10 102:7 107:5,6 108:14,18 113:12,15,16 119:6 122:2 127:13 129:12 135:22 142:2 144:16 148:3 164:1 169:2,20 173:5,10 174:2 175:5 178:17 183:7 188:5 196:12 205:7,10 206:5,8 215:21 218:1 219:2 228:5 228:7,9,18 229:15 230:1,12,13 233:22 242:1,2 244:5 247:2 249:18 250:1 262:1,4 263:3 266:14 268:12,21 269:1,5,6,16,17 270:4,9,12,15 271:1,5,9 273:9 274:11 report's 49:7 158:7 171:1 205:20 reportable 8:5,10 reported 8:14 87:12 90:7 254:9 reportedly 256:3 reporter 112:3 118:1 reporting 85:19 94:1 265:17 reports 62:6 73:7 75:16 79:20 81:5 87:17 90:18,19 95:14,15 97:6 114:14 128:13,18 146:12 163:19 170:15 196:17 210:22 216:7 218:16 251:15,18 255:16 represent 138:9 177:14 222:10 234:9 representation 105:18 175:13 199:3 200:4 representative 48:3 85:3,11 162:3 187:1 representatives 26:6 77:13 84:11 84:20,22 101:15 102:1 103:21 104:4 105:1,10,11 105:14 140:17 175:22 176:4 202:11 249:14 254:19 259:7 represented 102:1 115:22 175:12,20 176:20 representing 151:18 170:1 198:5 212:16 234:20 235:4 represents 6:14 35:22 109:7 125:20 142:3 177:8 246:4 request 25:19 26:5 75:17 146:16 183:15 220:22 requesting 143:6 require 23:17,18,21 41:13 42:21 46:11 47:1,14 49:9 53:4 70:11,18 74:8 76:12 77:3,5 78:17 87:5,12,19 92:4 119:9,21 122:10,12 129:13 145:14 148:10 151:5 181:1 192:10 220:6 263:16 264:6 required 77:8 78:18 87:20 120:1 137:20 177:21 214:15 218:8 225:18 250:3 255:6 requirement 25:20 41:7 71:3,7 72:12 120:22 requirements 43:21 76:16 83:20 121:18 134:14 136:12 137:13,19 173:4 200:9 206:20 264:10 requires 41:18 73:18 83:4,12 85:19 126:5,11 128:22 134:18,20 134:22 177:18,22 178:3 224:8 249:9 252:2 requiring 76:21 120:8 148:6,17 202:18 requisite 72:20 research 22:2 180:17 reservations 12:21 217:4 resident 152:6,13 185:9 186:22 235:5,5 257:20 residents 27:9 28:9 28:15 47:20 48:15 65:10 156:20 162:8 186:3 198:10 203:10 259:12 resides 125:1 Resistance 184:7 resolve 41:10 resourced 23:11 resources 14:18 16:16 17:20 45:11 48:22 51:18 52:14 88:5 115:8 122:13 125:18 128:22 129:18 140:9,12 146:11,12 154:14 154:19 156:18 165:13 201:8,13 202:16 206:17 220:1 229:3 231:2 264:2 respect 59:16 224:12 263:12 respected 150:10 respectfully 38:12 42:6 221:15 respiratory 28:11 respond 73:15 140:21 142:7 144:1 205:12 responded 65:2 responding 53:14 124:1 127:8 150:13,18 response 64:2 65:1 79:2 83:20 88:20 89:1 113:9 114:21 116:6 117:5 120:12 231:12 250:21 261:9 responses 5:16 183:15 responsibilities 84:19 responsibility 62:13 75:6 224:7

202-234-4433 Neal R. Gross and Co., Inc. Page 305 responsible 27:21 72:15 141:6 147:7 177:11 178:13 rest 240:15 restate 113:18 restitution 117:7 restore 257:12 restored 133:18 restrictions 256:22 result 45:18 70:12 104:13 216:3 231:14 234:4 247:20 254:10 resulted 14:4 64:18 66:5,7,10,12,13 results 146:17 269:8,10 retain 46:7 81:3 86:9 264:3 retaliation 103:5 retaliatory 265:9 retire 253:21 256:1 revealed 92:6 revenues 140:14 review 3:10 14:3 26:21 31:4 52:21 67:9 75:19 79:19 86:13 95:10,20 101:4 132:15 134:19 136:9 145:16 167:2 174:12 180:8 182:22 reviewed 5:15,22 63:19 97:3 178:6 182:19 196:21 reviewing 128:12 168:8 180:9 reviews 46:16 75:22 119:21 revise 116:8 248:4 revisions 131:7 143:7 144:4 revolving 156:4 233:5 Reynolds 8:12 111:16,17,18,20 112:5,7 117:21 125:10 Richard 1:17 4:13 164:18 Richmond 1:3 6:14 18:22 26:10 27:2 27:6,9 28:2,20 29:9 30:4,11 31:8 33:10 36:19 43:15 43:19 47:5 55:13 63:1 64:19 67:5 73:4 114:11 119:19 124:6 134:11 135:5 136:4 138:16 139:8,21 152:6 153:5,10 157:15 158:2 159:6,19 160:7,8 161:22 172:22 177:10 185:9,16 186:3,10 186:22 196:16 197:21 198:5,10 199:22 203:9 205:14,15 207:12 207:17 209:11 211:11,13 223:19 231:7 234:21 235:6,17,18 236:2 237:21 242:15 246:3,7 247:20 248:4,18 249:6 251:6,14 254:1,14 254:15 255:7,12 256:3,3 257:18,20 259:8,12 260:8 Rick 147:20 rid 253:11 ridiculous 239:10 right 4:5,8,13,18 32:5,8,14 34:3 36:16 58:11 91:6 94:21 97:4 111:14 118:11 148:2 152:17 158:6,15 166:4 167:20 169:8,13 186:11 189:18 192:3 193:15 200:19 210:15 211:10,11 240:17 245:19 250:22 266:20 267:13,17 270:7 rights 17:13 32:12 41:15 84:19 256:9 256:10 rigorous 10:2 35:10 68:10 82:9 175:14 180:3 215:2,6 220:11 risk 8:6 29:3 31:21 38:22 41:1 46:19 63:16 67:22 69:3 69:8 70:16 71:9 72:4 73:19 74:8 75:1,18 76:4 77:19 80:5 83:11 86:2 115:7 160:10 162:20 166:9 171:9 172:3,17 180:14,15,19,20 181:2 212:17 224:6,8 237:7 242:18 264:7 265:21 risks 29:20 75:10 76:7 81:2,15 82:22 140:3 145:19 178:1 265:22 RMP 70:3,21 95:4 98:2 172:16 173:4 road 192:6 Robert's 267:5 268:9 271:11 Roberta 250:17,19 robust 206:18 Rodeo 242:15 Roger 223:13,16 238:2 Rogers 2:7 31:2 55:9,12,13 156:2 270:6 Rok 245:2 role 15:15 38:15 49:3 77:21 84:12 85:4 141:1 145:7 145:9,11 167:3 247:9 265:5 roles 145:20 167:10 230:6 rolled 59:15 rolling 210:13 Ron 141:17,20 170:20 room 151:15 189:22 249:22 root 11:2,8 38:17 119:10,12,16 134:20 165:1 191:5 215:9 Rory 14:9 Rosenberg 1:13 2:3 4:4 11:21,22 35:20 36:18 48:10 102:17,18 106:6 123:19 132:18 191:18 232:11 262:19,21 267:19 272:15 273:2,11 273:14,19,20 274:10 Ross 204:9,15 RPA 251:6 Ruk 244:21,22 245:1,2,3,3,5,5,9 245:12,16,18,21 249:2 rule 62:6 76:21 77:8 84:2 144:5 148:13 rules 8:7 148:5,16 250:4 254:7 267:5 268:9 271:11 run 4:12 60:22 258:6 rupture 67:5 124:6 ruptured 139:9 S s 3:1 84:15 S-A-E-T-E-U-R 185:8 S-A-W-Y-E-R 134:2 S-O-L-O-M-O-N 118:5 Sacramento 48:7 209:16 Saeteurn 185:4,7,8 185:9 safe 8:2 72:5 102:22 104:9 141:6,8 146:3 147:7 170:9 184:1 229:12 234:11 safeguards 60:10 67:17 72:17 83:13 83:16 86:1,4 87:8 151:1,6 172:18 safely 13:2 214:14 239:1 safer 44:1 49:10 67:20 70:19 75:13 77:3 79:22 123:4 123:4 148:10 149:1 205:17 213:1 228:14 229:5 232:4 safest 48:19 148:6 148:17 229:9 safety 1:1,10,12,12 1:14,22 3:11,18 3:22 4:7,9 6:10,18 7:17,20 9:4,7 10:2 10:6,7,11,13,15 10:17,19,21 11:14 11:20 12:14,17,20 13:5,8,13,14,21 13:22 14:1,5,6,8,8 14:13,16 15:4,6,9 15:11,15,16 16:2 16:4,9,12 18:5,10 19:13 20:8,9 21:17,20,22 22:16 22:21 23:2,14 24:2,8,10,16,21 25:11,17,20 29:1

202-234-4433 Neal R. Gross and Co., Inc. Page 306 29:12 30:7,13,18 30:22 31:4 32:12 35:3,10,15,16 36:4 37:1,12,15 37:19 38:2,7 41:5 41:19,22 42:14 43:3,11,16 44:3,8 46:9,11 47:7,16 48:11 49:5,9,21 49:22 50:10,12,15 50:19 52:21 53:9 53:11,14 54:2,8 54:11,20 56:5,6 57:5,6 59:15 60:1 60:11 61:3,18 63:14 65:15 68:7 68:16,18,22 69:1 69:18,19 70:12 72:22 73:10,18 74:3,6,13,15,16 74:19,22 75:4,6,8 75:8,12,16,19,22 76:8,18 77:1,10 77:11,12,13 78:1 78:5,16,18,21 79:2,5,6,8,10,11 79:17,18,20 80:2 80:4,9,13,19 81:5 81:6,9,12,15,18 82:9,12,17 83:2,9 83:17,20 84:1,16 84:17,21,22 85:1 85:2,6,15,21 86:2 86:8 87:1,3,6,7,13 87:22 88:3,10,13 88:14,17,18 89:5 89:6 90:7,22 92:17 93:4,9,17 94:16 95:10,20 96:21 97:1,4,6,9 97:18,20 98:8,18 99:3,8,18,19,22 100:2,4 102:11 103:2,8,18 104:3 105:2,7 108:19,20 109:8,21 110:5,10 112:15 113:3,13 113:22 114:12 115:3,4 116:6 117:12 118:15,17 119:22 120:12,18 120:22 121:4,8,11 121:17 122:3,8,10 122:18 124:2,10 124:18,19,22 125:19 126:6,13 127:17 128:22 129:12,17 130:1 130:19 131:1,3,5 131:10,15 132:3 132:10,15,21 133:5,18 134:12 134:16 135:1,17 135:17,19,21 136:3,8,15 137:10 137:14,17 140:3 140:10 141:7 142:15,17 143:1 144:1,9,10,13,14 144:19,21 145:9 145:13 146:6,21 146:21 147:1,3 148:22 149:9,10 149:15,18,21 150:2,3,4 151:4,8 151:10 153:4,14 156:20 157:3,3 158:12 164:9 166:19 167:8 168:22 169:19 170:10,13,15 171:3,5,12,19 172:12 173:2,17 173:21 174:3,14 175:14,17 176:6 176:12 177:6,16 177:18,19,22 178:19,21 180:22 181:6,10,10 182:1 182:4,16,18 183:2 183:4 184:22 187:2,6,16,17 190:20 191:9,15 192:7 195:9,15 196:1 198:16,18 198:21 200:8,13 200:14,18,20 201:3,18,21 202:5 202:8 203:1,4,7 203:16 204:1 205:22 207:2 208:4,6 211:10,12 212:17 213:11,16 213:18,22 214:16 215:12,15,16,18 216:1,2,10,14 217:4,9,11,14,17 217:19 218:4,12 218:13,15,18 219:3,4,5,11,14 219:16 220:3,5,16 221:5,7,11,12,17 222:22 223:1,3,6 224:1,4,5,9 228:4 229:4,6,17 230:15 232:20 234:7 237:6,9 239:2,18 239:20 242:4 243:18 244:3,10 246:9,13,18 247:1 247:19 248:5,6,14 248:15,21 249:9 250:2,4 251:9,10 253:7 262:3,8,10 262:13,15 263:21 264:17,21,22 265:3,12,14,18 266:2,8 270:2,3 salaries 16:17 45:22 46:1,7 52:9 52:15 sample 9:5 San 208:11 sands 184:7 210:12 243:2 Sandy 185:4,8,9 sarcastically 14:12 sat 226:9 saw 203:7 235:11 Sawyer 133:15,21 134:2 155:11 saying 31:8 35:5 59:22 207:22 211:7 226:21 231:21 266:22 267:11 271:5 says 13:19 60:2 148:3 157:19 174:3 203:3 253:8 Sc.D 1:13 scared 186:9,10 scenario 246:10 scene 95:21 scheme 159:2 171:4 210:2 schools 139:17 222:21 Science 118:6 scientific 27:21 46:12 215:2 scientifically 108:6 scientist 123:13 163:13 201:12 scrutinize 14:19 scrutiny 215:7 sea 239:15 search 181:19 seat 161:16 162:5 second 27:7 51:18 67:11 76:3 97:11 99:9 114:20 128:19 131:11 140:15 183:6 193:1 224:5 249:21 262:9,17 262:19,21 267:21 267:22 268:1,1,20 268:22 269:22 272:12,13,15,18 273:12 274:6,8 seconded 266:19 267:2,8,19 271:14 272:22 273:10,14 274:7,8 secondly 172:16 233:3 secret 153:19 154:2 154:7 secretaries 125:10 258:21 Secretary 111:16 112:8 118:6 secrets 97:8 100:18 210:4 236:10 section 21:7 190:7 sections 200:10 sector 19:10 93:22 127:19 131:19 security 88:13 124:2 132:3 208:14 221:5,7 see 4:21 15:12 33:6 43:10 95:22 120:18 133:18 152:14,15,16,18 153:2 154:6 160:4 160:5 164:4,10 168:9 183:16 199:4,7,10,12,15 237:9 240:1 250:8 271:3 seeing 239:6 seek 65:10 seeking 89:10 131:6 183:17 257:12 seemingly 64:16 seen 60:9 105:19 126:19 129:10 156:4 189:15 233:6 sees 143:12 173:6 Segundo 138:13,18 139:12,14,19 selected 264:12 265:14 Senator 17:15 41:17 send 5:19 147:14 sends 237:11 senior 20:9 141:21 163:13 216:20 sense 17:8 51:14 sent 27:17 55:3 161:14 203:10

202-234-4433 Neal R. Gross and Co., Inc. Page 307 separated 237:1 separation 92:21 series 115:14 119:1 serious 3:7 9:6 17:7 28:13,16 39:18,19 41:19 85:14 110:21 116:20 192:11 197:5 201:20 248:7 263:4,17 seriously 49:11 serve 85:2 served 13:16 216:20 service 163:16 222:19 238:22 Services 21:3 24:7 38:10 43:12 44:7 44:17 45:2 51:3 51:11 53:4 128:15 263:14,20 264:2,6 serving 213:12 sessions 105:14 160:12 set 54:12 84:18 109:2 197:9 265:21 sets 80:15 setting 69:11 settlement 128:11 seven 12:2 45:16 66:14 116:1 253:2 253:13 257:1 Seventeen 7:21 65:16 severe 27:10 28:3 65:3 135:13 206:8 235:18 severity 135:8,11 shadow 27:13 208:20 shaking 165:20 shale 239:6 share 123:3 214:11 shareholders 208:9 208:11 shares 219:21 sharing 47:5 54:9 114:19 142:12 sheer 258:12 sheet 253:8 shelter 43:7 sheltering 27:18 shift 122:11 167:15 198:19 shifts 29:17,18 224:6 shocking 237:4 short 14:14 18:14 24:17 31:10 61:9 61:16 171:6 182:3 192:4 215:13 274:12 show 29:19 68:6 90:14 111:11 159:22 showed 19:14 196:12 255:13 showing 219:18 shown 13:13 75:4 shows 46:18 248:8 shuffle 60:12 shutdown 40:6 104:9 194:12 shutdowns 78:12 SICA 67:4 sick 253:22 254:15 255:21 side 58:14 167:6 sides 18:10 Sierra 205:3 sighted 241:3 sign 179:18 260:3 signed 111:10,12 160:15 221:3 238:4 significance 176:19 significant 7:20 19:9 65:12,15 73:2 76:2 88:16 90:19 91:19 92:16 98:22 99:11 114:5 119:10 125:20 145:14 174:4 183:11 219:9 220:8 243:6 significantly 65:19 142:6 243:3 silicon 65:5 similar 10:10 74:9 93:4 139:21 157:15 175:10 184:17 193:9 218:1 241:9 264:13 Similarly 195:16 simple 58:5 simply 13:9 53:6 58:5 214:21 217:14 246:16 Sincerely 47:21 single 102:21 sir 152:3 204:11 249:4 260:4,5,11 sirens 31:14,16 sisters 186:5 site 146:2 147:6 site's 145:11,17 sites 141:10 sitting 4:13,16,17 situated 129:5 situation 59:22 167:17 situations 121:14 121:16 six 8:20 116:17 117:7 139:16 166:3 184:21 sixth 79:16 skill 80:14 skilled 172:13 skills 86:10 Skinner 17:14 41:16 skirt 210:4 slate 166:5 168:10 slide 90:5,6 slides 68:19 slightly 167:9 slow 73:14 144:1 small 64:16 66:15 110:15 134:9 243:14 smaller 34:20 smoke 27:14 256:22 social 31:12 34:8 258:13 society 74:2 239:15 softball 162:17 Solano 211:16 solicitor 182:8 Solomon 117:21 118:2,4 123:12 125:10 131:8 solution 19:17 136:21 165:9 225:18 250:1 solutions 19:1 25:22 185:21 somewhat 13:4 168:2 son 236:7 sooner 40:3 76:1 sorry 6:7 45:8 245:5,8 267:14 sort 102:18 157:5 165:10 sorts 93:6 208:15 209:4 Soto 207:11,13,15 212:11 sought 235:9 251:16 sounds 153:15 source 130:16 140:13 256:20 sources 46:6 170:16 235:20 Southern 20:6 116:12 138:11 211:18 Spare 252:13 256:16 speak 4:19 96:8 112:14 134:4 221:18 222:9 245:22 249:1 260:3 261:8 speaker 189:16 236:16 speakers 136:16 166:13 speaking 122:15 249:6 special 9:21 128:2 129:13 194:3 199:22 specialist 177:6 specific 5:15 46:4 52:12 74:9 107:4 149:13 171:1 195:12 196:19 268:13,17 269:9 271:20 specifically 5:12 25:15 35:12 65:21 164:6 205:9 242:21 253:8 263:7 spectrum 22:4 spell 112:2 117:22 123:15 169:8 185:6 245:15 260:10 spelled 112:7 118:5 138:8 190:11 213:9 222:7 spend 199:8,19 spending 209:16 235:7 spends 236:17 spent 209:12 219:10,12,15,17 248:8 spill 93:16 197:15 spirit 165:8 spite 158:17 159:5 255:15 spoke 223:8,8 spoken 106:4 261:8 sponsorship 105:17 spot 159:5 spread 28:20 spurts 231:12

202-234-4433 Neal R. Gross and Co., Inc. Page 308 squeeze 208:7 stabilized 106:5 stacks 27:15 staff 1:15 7:4 18:5 18:9 22:1 26:19 28:21 29:6 42:12 44:2 50:13,17 52:3,8 54:10 59:2 62:18 64:2 71:15 72:20 81:4 89:19 89:20 103:9 112:18,20 123:20 129:22 130:3 131:12 134:10 136:5,18 152:10 165:11 173:11 187:3 191:1 201:11 203:6 205:14 207:18 209:10 211:5 226:4 241:18 252:15 263:8,10 264:11 270:20 staff's 63:1 202:7 207:4 223:21 225:19 staffed 86:6 staffing 16:16 46:5 52:15 120:10 194:1,16 195:14 stage 149:14 189:17,19 stakeholders 22:4 81:10 86:20 113:10 143:7 183:11 189:6 247:14 stand 27:19 32:1,15 222:21 standard 69:6,9 88:18 129:17,19 131:3,22 132:20 142:18,20 143:6,8 143:9,15,22 144:10 146:18 149:16 151:5 177:20 178:19 179:7,14 180:22 181:9,13 182:20 183:4 191:15 205:22 215:19 220:21 229:9 255:9 standardized 87:11 standards 47:2 53:5 73:12 76:21 84:4,8 86:1 119:2 133:6 183:18 226:21 227:1,3 254:5 265:20 standpoint 174:21 189:14 stands 173:7 start 15:3 18:4 19:4 89:21 111:15 223:2 225:21 262:2 starts 232:5 state 6:6 7:22 10:1 10:19 17:3,10 20:20 27:8 41:12 47:8 53:17 61:18 73:8 82:7,11 86:17,20 111:17 112:16 115:21 124:16 125:11 127:6 129:20 130:5,9 137:5 157:17 164:13 167:22 172:13 183:21 185:17 191:20 209:17 219:10 220:2 221:16 247:3,6,9 263:13 state's 125:15 128:3 130:11,22 133:3 136:14 247:14 state-wide 125:1 stated 108:14,18 146:1 174:19 statement 7:3 18:19 24:21 61:7 75:15 102:13 213:14 statements 2:2 26:9 64:10 states 6:22 7:18 8:8 9:6 10:12 24:12 24:19 50:16 65:18 69:14 74:5 93:19 94:17 95:5 102:4 104:13 105:20 113:16 129:16 153:11 169:15,21 198:18 205:1 215:21 217:7 227:10 242:10 statewide 128:1,5 167:13 190:12 static 69:14 198:22 status 110:4 203:5 203:12,12 232:1 stay 31:18 steady 130:16 steel 6:12 65:6 77:5 steelworkers 6:15 14:12 22:15 103:13 138:4,9 177:2,7 203:20 steer 108:6 stemming 117:4 step 35:19 82:9 105:6 161:3 176:5 step-by 82:8 Stephanie 244:16 stepped 241:2 steps 33:20 93:12 108:22 109:1 119:4 128:20 191:22 Steve 191:16 260:6 stop 48:17 85:12 102:8 160:8 163:4 163:5 200:10 238:20 239:7 240:4,14 255:21 Stopping 240:12 stops 156:12 storage 94:19,19,20 222:16 stored 255:18 story 58:6 straight 253:13 strands 100:5 strategy 74:22 street 186:11 streets 31:16 strength 104:14 199:4,7 strengthen 23:4,9 45:7,9 46:21 47:12 49:8 53:3 61:15 114:2,20 strengthened 25:21 50:18 54:15 206:1 strengthening 43:21 151:6 164:4 202:9,21 strengths 24:16 84:4 stressed 19:12 stressing 19:4 strict 254:5 strikes 96:2,5 strip 210:7 strives 237:10 strong 13:10 187:6 188:13 189:3,8 194:4 199:1 200:18 201:16 206:19 217:3 243:19 stronger 35:21 100:6 117:15 136:13 274:11 strongest 150:6 strongly 203:18 242:1 270:14 structure 54:19 125:15 students 260:15 studied 24:13 studies 144:12 215:22 study 9:8 19:13 22:6,9 220:11 221:10 studying 47:9 stuff 90:11 94:1 210:8,21 239:3 stumbled 95:11 subject 12:3 135:3 subjected 215:6 submit 72:13 147:13 submitted 14:17 63:18 85:18 94:10 170:17 263:5 subsequent 230:1 subset 128:17 substantial 5:21 184:13 substantive 70:3 substitutes 150:7 success 135:16,20 successful 137:15 253:10 suffer 27:4 28:3 160:2 261:2 suffered 27:10,16 29:2 257:12 suffering 27:13 35:2 254:3 suffers 218:1 sufficient 23:12 52:11 72:22 79:9 86:9 140:12 202:16 263:15 264:2,6 sufficiently 81:1 206:7 suggest 163:17 165:15,18 269:16 suggested 107:1 250:12 suggestion 59:4 60:6 suggestions 6:2 7:6 107:12 170:10 174:17 230:8 268:15,15 suited 247:6 sulfidation 12:3

202-234-4433 Neal R. Gross and Co., Inc. Page 309 38:22 39:9 64:21 65:6 67:22 71:15 71:17 77:6 104:1 139:10 184:18 206:3 243:6 sulfidaton 71:21 sulphide 228:15 sulphur 166:5,9,15 243:4 sulphuric 161:12 summaries 78:18 97:9 summarize 18:3 78:21 147:17 184:11 summary 85:21 95:14 Sunflower 238:8,17 superior 13:21 217:9 218:12 supervisor 43:18 48:4,6 54:21 57:10 61:6 164:7 174:19 202:12 229:21 supervisors 49:2,17 174:18 244:7 supplement 225:11 supplies 170:4 support 52:15 124:8 130:7 132:6 140:6 146:20 152:11 164:3 179:13 183:6 184:12 185:1 187:2 197:6 201:16 202:7 203:5,19 205:6 215:4 222:22 228:2 233:17 supported 130:17 215:5 218:5 228:7 228:8 supporting 30:21 33:7 54:4 58:17 101:17 164:1 200:20 supportive 97:19 98:4,14,16 supports 17:13 52:3 supposed 3:18 60:20 158:7 sure 5:4 94:10 96:9 103:6 136:10 167:7 179:20 200:17 surprise 33:15,18 surrounding 78:2 214:9 survey 216:7 Sweckerman 250:18,19,20 sweeping 9:17 218:9 Swickerman 250:18 Swiss 8:11,12 switch 168:1 225:10 Sylvia 250:22 251:1 251:5 symbolize 230:19 symptoms 28:13,16 syndrome 156:5 system 8:1 9:15 11:5 22:16 23:13 35:6 56:9 69:1 72:8 78:8 86:7,14 86:21 91:7 93:14 118:12,18 134:19 140:10 146:7 147:2 148:22 168:2 188:3,14,17 198:19,20 199:1 200:2 206:14 210:5 216:14 224:1 228:10,22 229:11 232:2 255:14 systematic 82:19 systematically 120:2 systems 10:8 13:16 37:16,16 38:18 44:1 46:13 49:10 68:17 70:19 72:13 77:6 79:3 86:4 87:8 92:18 118:15 126:6 128:13 205:17 216:17 224:2 T T-A-B-L-E 2:1 T-A-R-N-E-L 234:18 table 271:14,15 tables 64:3 take 16:2 17:6 33:20 41:10 81:7 81:20 89:12 99:19 117:15 127:15 130:14 188:22 192:2 209:20 211:5 219:8 227:5 230:7 244:2 247:16 252:17 267:20 271:12 taken 49:3,10 127:3 137:4 173:11 201:2 233:8 265:9 takes 144:6 talk 35:12 118:10 193:20 talked 229:2 260:4 talking 34:16,20 90:6 128:20 155:21 157:1 158:11 159:21 tanks 94:19,20 tape 31:18 tar 184:6 210:12 243:2 target 58:11 79:14 targeting 128:2 197:10 targets 74:9 Tarnel 234:15,16 234:17 task 11:13 47:9 53:16,18 54:1,5,6 112:12,17 115:16 115:18 116:4 118:8 125:6,11 127:9 132:13 136:15 172:20 taught 260:8 teacher 260:7 team 1:20 2:14 4:15 9:19 11:7 62:8,12 64:5,9 82:4 106:12,13 107:7 108:21,22 127:2 148:21 175:2 212:13 team's 2:11 82:2 teams 140:11 196:9 technical 69:16 72:21 73:15 80:21 86:11 129:22 131:12 154:15,21 205:14 215:6 220:11 230:21 technically 81:3 83:3 86:6 126:2 129:7 145:15 264:4 technologies 149:1 technology 46:12 83:21 123:5 216:18 228:14 229:6 teeth 193:14 236:22 tell 168:7 236:8 252:21 258:18 temperature 129:3 temporary 40:5,8 138:21 ten 40:14 204:22 213:12 226:15 260:8 tenure 213:20 term 16:5 18:14 25:22 61:9,16 191:20 192:4 terminal 222:16 terms 30:18 96:20 98:17 109:3 121:12,14 128:9 155:22 158:4 197:1 229:2 236:10,15 261:1 Terrance 2:7 48:4 terrible 179:2 Tesoro 66:12 test 10:20 252:7,9 252:22 253:5 255:13,17 tested 255:3 testimony 28:9 236:12 testing 128:16 255:5 Texas 6:8 9:2 13:18 66:9 100:20 132:4 150:20 153:12 160:15 264:14 thank 11:22 18:16 18:20 26:1,3,17 26:19 32:17 33:1 36:2,3,3,6,8,13,18 47:4,22 48:10 54:4,7,22 55:4,5 55:12 61:20 62:20 62:21 63:17 67:1 74:14 89:13,14 102:14,14 106:6,7 111:19 112:13 117:17,18,20 119:6 123:9,11,17 123:22 124:4,14 133:9,12,14 134:2 136:18 137:21 138:1,3 141:11,13 141:16 147:8,10 147:22 151:12 152:2,9,18,19 163:8,11,15 169:4 169:13,17 173:14 173:18,19 184:1,3 185:5,20 187:7,8 187:21 189:21 190:9 197:20 198:1,11,15 201:3

202-234-4433 Neal R. Gross and Co., Inc. Page 310 201:6 204:6,8,17 207:3,5,7,17 211:3,22 212:10 212:11,12,15 221:17,19 222:8 223:12,18 225:18 226:1,2 227:13,15 231:1,3,5 234:11 234:14,18 235:2,6 237:17,19 238:9 239:1 241:9,12,18 244:12,15 245:19 245:21 248:22 249:2,7 250:13,16 251:8 257:10,13 257:15,18 259:21 260:1,13 261:3,4 274:15 thankfully 17:17 thanking 190:22 Thanks 82:3 177:1 thin 64:21 thing 5:2 32:14 33:8 131:6 157:11 175:16 186:7 227:7 231:10 232:2 233:19 237:8 239:22 241:9 things 56:15 60:15 96:7 99:17 107:19 107:22 108:2,7 119:1 150:16 157:2 181:16,21 200:19 202:13 208:15 231:15,16 231:16,17 232:7 232:13 239:18 240:3 268:16 270:22 271:20 think 18:8 23:7 56:11 57:3,13 58:15 59:7,17,18 59:21 60:3,4 61:2 61:4 90:2 92:9,14 93:5 94:3 95:11 96:9,17,18,22 100:6 101:13,19 103:2,6,12 104:20 105:15,19 107:7 108:7,11 109:18 121:6 123:12 133:15 136:11 149:19 157:5 175:6,8,10,11 176:2,12 181:6,16 184:9 187:18 188:5,8,12,15,18 188:21,22 189:13 189:14,16,18 191:9,19,21 192:1 194:16 197:14 202:21 203:20 206:15 211:9 236:6 237:15 239:19,22 240:1 240:16 260:22 261:18 270:5,6,10 271:16 274:16 thinks 146:10,14,19 195:2 thinning 65:3 third 52:18 62:7 76:17 107:6 115:2 130:21 183:13 224:17 262:11 269:4,6,16 271:1 271:9 thirdly 141:3 thorough 48:12 83:2 144:5 185:20 218:7 223:21 thoroughly 67:16 thought 7:7 57:1,2 257:22 thoughtful 55:19 thoughts 54:10 thousands 129:4 threaten 117:16 threatening 161:16 three 4:6 8:17 12:6 13:4 15:13 37:9 46:2 56:18 66:1 127:11 128:9 139:3 140:4 192:17,19 206:12 223:19 252:11,13 264:1 268:13,21 269:10,12 270:19 273:9 ticking 56:16 167:16 tied 37:17 165:9 ties 193:8 tightly 108:7 Tillema 1:20 2:9 63:7 66:19 67:1 127:2 time 4:7 14:9 18:9 28:8,8 47:11,22 56:15 57:7 61:6 61:11 81:7 92:2 93:12 100:14 101:2 116:8 123:10 129:10 144:6 149:20 152:14 166:2 167:16 212:18 225:19 226:6 227:5 235:7 240:17,19 248:7 248:22 266:8 267:5 271:20 timely 17:2,11,22 41:13 42:8,13,17 45:6,8 47:14 50:5 58:18 84:7 142:12 192:10 202:19 263:16 times 8:17 12:2 37:9 66:1 139:3 146:2 238:22 tired 241:19 tireless 241:19 today 5:7 6:4 7:9 9:13,16 11:10 27:19 36:21 44:5 106:19 107:1,14 112:14 132:21 138:15 139:22 140:6 146:2 156:6 170:22 186:2 198:22 201:16 212:20 226:22 230:16 242:1 245:22 told 31:19 180:17 226:10 252:17 258:22 tomorrow 156:6 249:19 tonight 12:18 20:18 33:7 36:15 56:1 57:3,21 59:10 63:6 108:12 142:1 163:16 164:3,20 165:17 169:2 170:20 173:15 186:6,22 188:9,16 197:21 201:19 202:2,10,22 222:9 225:3 230:13,17 249:11,17 250:7 263:6 tonight's 62:22 64:4 174:6 tons 186:15 toolkit 47:3 tools 108:8 121:5 131:12 165:13 194:4,14 266:4 top 121:3 192:18 topic 57:2 topics 122:4 264:16 265:4 Tosco 66:6 total 23:1 251:11 touted 12:14 16:9 21:4 town 243:15 255:11 town's 139:16 toxic 34:22 214:1 235:17 256:12 toxicity 252:8 Toxics 153:1,6 toxins 28:19 31:21 159:4 162:15 track 43:1 trackable 179:19 tracked 65:14 91:13 tracks 86:22 trade 97:8 98:10 100:18 105:9 153:18 154:2,7 159:1 169:22 210:4,8 236:10 246:4 tradeoffs 219:19 trading 159:2 traditionally 243:4 train 16:3 trained 233:4,18 training 58:13 105:13 179:15,17 220:7 trains 239:6 transcribes 112:3 transcript 1:22 transfer 222:16 transition 68:10 81:18 219:4 266:6 transparency 77:22 78:7 98:18,22 99:10,11,15,21 100:10,13 126:9 168:9 210:1 228:21 258:6 259:11 265:5 transparent 122:19 167:1 258:14 transplant 253:11 253:14 transport 170:2 Transportation 243:12 travel 95:19 treat 251:22 treated 81:13,16 treatment 251:16 251:20 252:11 trees 108:9 tremendous 62:5 207:5 tremendously

202-234-4433 Neal R. Gross and Co., Inc. Page 311 211:1 trends 87:16 88:3 Trepanier 184:4 trial 182:10 tried 7:19 triparthied 77:15 84:9 101:15 105:7 140:15 174:12 187:17 188:2 195:18 228:22 265:8 Trombettas 125:2 127:21 true 24:22 99:17 139:12 150:20 195:20 215:9 240:6 truly 33:20 54:21 try 15:1 59:17 60:7 60:8 107:16,21 108:6 111:5 118:12 165:21 167:7 trying 7:5 12:18 118:20 157:1 158:21 181:12 222:15 225:9 turn 66:18 74:11 turnaround 40:3 40:11,18 71:21 turnarounds 78:11 turned 179:16 180:19 226:18 TV 151:13 twice 28:5 238:4 two 3:15,16,16 16:12 42:22 43:16 56:12,18 62:4,6 66:12 69:8 88:4 106:10 115:19 116:4 131:6 145:6 188:8,11 190:15 222:19 232:13 239:7 263:19 264:11 265:2 267:16 268:6,13 two-thirds 177:12 type 19:6 20:13 84:9 145:8 156:9 types 214:10 typical 101:6 193:5 typically 72:9 76:10 94:10 97:5 109:7 U U.K 13:13 14:10 19:13 35:13 84:15 132:12 144:3 175:9,22 182:19 191:17 U.K's 15:14 U.S 1:1,10,12,12,14 1:22 3:22 7:21 8:16,22 9:15 10:16 19:7 29:14 37:7 48:11 50:4 63:4,13 65:15,21 67:7 68:12,15,21 70:7,17 71:10 72:1,19 116:1 117:8 128:15 129:15 130:20 134:16 139:3,6 144:3 145:1 146:21 153:4 165:12 169:18 170:14 179:2 213:19 216:5 218:19 241:17 UE 98:6 UK 98:11 ultimate 247:18 ultimately 76:12 126:18 137:14 146:3 147:7 168:14 211:16 ultrasonic 128:16 unable 36:20 69:15 199:16 unanswered 22:3 unattended 226:16 uncertainly 143:2 uncertainty 171:21 214:8 unconventional 242:22 uncovered 140:14 uncovers 126:1 under-funding 206:9 under-staffing 206:9 underemployed 256:4 underlying 127:5 191:13 undermine 248:1 underpinnings 92:15 understand 7:6 15:1 43:18 94:5 95:18 119:15 155:3,8,13 164:11 176:8 193:4 214:7 240:1 understanding 20:4 126:4,11 131:5 171:20 understands 234:7 understood 142:21 172:1 undertake 122:22 264:7 undertaken 125:22 underway 221:9 uneasy 15:10 unfamiliar 216:5 unfortunately 167:21 215:12 217:22 unified 116:1 unintended 171:15 union 8:18 37:9 59:12 98:2 101:16 103:20 138:10 167:4 168:5 174:1 175:22 176:14 177:8,8 178:6,14 183:14 190:17 unionization 174:21 175:5,8 unionized 176:2 unions 42:3 97:14 98:1,6,13 101:21 103:13 105:9 176:16 188:11 199:10,13 200:7 200:20,21 204:22 232:14,18 unique 25:10 129:15 194:9 247:19 unit 71:19 73:10 124:22 125:4 127:21 128:21 129:18,22 130:16 133:17 135:2 194:12,18,20,22 195:11 united 6:12,15 7:18 8:7 9:6 10:8,12 14:11 22:14 24:11 24:19 50:15 59:19 61:17 65:18 69:14 74:5 75:21 82:14 91:11 93:18 94:16 95:5 97:15 98:3 98:11 101:21 102:3 104:13,22 105:5,20 135:18 138:4,9 149:2,8 149:11,12 153:11 176:17 177:2,7 198:17 205:1 242:9 unites 98:2 204:22 units 45:20 51:22 64:17 universe 208:17 University 6:8 20:6 22:12 unnecessary 247:8 unpleasant 33:14 unrealistic 113:20 unsafe 85:13 102:8 240:3 unsuccessful 73:12 unusual 167:22 unwarranted 142:19 unwell 133:17 updated 88:7 updating 73:14 upgraded 77:7 upper 196:12 upset 222:11 urge 9:20 164:3 187:3 211:4 232:3 237:17 242:2 244:4,5 urged 216:11 urgent 167:17 225:17 use 10:8 14:1 39:12 44:1 49:9 70:14 70:18 74:6 79:5 79:13 82:13 83:17 87:5,22 127:22 148:6,17 175:13 187:16 194:10,10 217:17 useful 181:18 197:1 uses 77:15 usual 249:19 252:17 USW 182:21 Utah 184:6,17,19 184:20 185:3 Utility 227:20 utilized 86:2 utmost 117:14 utterly 237:4 V vacant 45:22 46:2 52:10 Valero 66:11 validates 207:21 valuable 38:5 126:15 value 127:6 values 112:17 126:7 valves 40:15 92:22

202-234-4433 Neal R. Gross and Co., Inc. Page 312 93:1 various 26:5 176:10 189:1 233:16 250:3 Venetia 211:17 242:15 veracity 128:17 verifiable 74:17 verification 79:18 128:16 verifies 72:9 verify 83:8 version 17:10 98:7 versus 92:19 vessels 93:1 vetoed 17:16 42:4 Vice-Mayor 2:6 31:1,3 33:3,5,9 34:7 36:9 229:20 Vice-President 187:12 view 83:2 101:5 views 96:17 vigilant 56:20 vigorously 184:15 violated 256:9 violation 17:5,7 40:11 41:5 117:10 violations 16:20 40:1 41:8,19 44:15 45:4 51:9 166:19 192:11 193:9 230:5 263:18 Virginia 3:7 21:9 94:21 212:20 239:10 visit 92:6 235:12 visited 96:13 vital 52:17 voice 42:3 103:1 133:22 183:12 203:21 230:20 voiced 200:12 volatile 243:9 voluminous 249:8 vote 7:11 32:18 36:6 64:11 261:22 262:4 263:2 266:22 267:20 268:17,22 271:6,7 271:18,19,22 273:4,5,6,15 274:2,4 voted 63:21 votes 36:21 voting 7:10 9:12 262:1 270:16 vulnerable 161:2 W W-E-R-B-O-F-F 138:8 W-I-L 226:4 W-I-L-S-O-N 123:18 wait 244:1 waiting 160:20 182:9 wake 132:4 walls 258:6 want 19:4 26:14,17 26:18 29:19 30:16 31:7,10 36:18 47:4 48:10 50:10 54:7 55:18,20 90:3 118:16 140:6 141:11 147:11 152:13,14,15,16 152:17,18 153:13 156:9,10 160:4 162:16 163:15 164:21 165:15 168:9 186:7,7,8 197:20 201:22 211:3,9,11,20 227:4 235:6 245:12,21 249:7 255:1 259:12 269:6,13 270:6,7 271:11,17,18 wanted 43:10 112:13 118:10,12 152:9 160:5 170:22 190:14 197:13 222:1 251:8 258:4 wanting 9:16 wants 233:20 warned 12:2 166:8 warnings 12:9 19:21 205:12 warranted 246:11 wary 236:13 Washington 17:10 36:21 41:12 124:11 147:21 170:5 192:14 195:5 209:17 wasn't 57:21 60:18 109:12 135:7 watching 106:10 147:12 151:13 water 3:8 216:21 way 3:13 9:17 14:7 15:22 19:1 28:20 29:7 32:6 58:3 61:4 122:19 136:19 152:11 155:20 165:11 184:14 197:5 209:5 210:6,10 231:17 238:14 239:17 251:10 255:11 269:5 ways 113:21 132:19 213:21 233:16 we'll 4:18 123:9,12 128:15 133:15 147:16 161:6 163:1 184:10 189:22 201:1,7 207:10 231:6 233:20 237:20 244:21 249:18 we're 4:22 20:18 31:8,14,15,19,19 32:1 34:20 57:3 59:17 60:1,4 94:20 100:9 106:15 107:4 108:18 109:5 110:1,12 116:10 119:4,7 120:15,19 121:7,12,15,18,21 122:13 123:1 128:6,8,19 130:1 131:6,17 132:19 157:1,5 158:3,11 160:20 162:18,18 163:5 165:17 166:10 167:12 168:2 177:8 185:13 186:2,6,9 189:18 190:12 191:21 195:14 201:13,18 210:19 228:2 240:9,17,17 246:4 261:11,22 we've 27:12,16 57:19 59:10 97:12 105:19 118:22 126:19 129:16 131:16 153:8,9,22 154:8 156:4 166:22 188:15 189:7,8,15 203:11 215:9 233:6 239:5 249:11,12 251:14 weak 13:10,10 181:14 182:19 199:2,2 200:12 232:15 weakened 15:22 weakness 46:14 199:10,12,15 weaknesses 68:9 Website 5:15 191:12 WEDNESDAY 1:7 week 243:11 253:1 253:2 257:2 weeks 22:5 239:8 weight 218:11 225:4,15 welcome 2:2 26:14 26:14 33:13 147:13 153:4 174:17 198:18 welcomes 174:2 well-accepted 40:11 well-resourced 145:15 well-trained 81:4 went 28:15 43:8 96:1 100:22 161:21 227:1 235:11,14 261:15 261:15 Werboff 138:4,5,7 138:8 weren't 60:17,21 104:2 109:17 WesPac 211:15 222:13,15 WesPac's 223:4 West 3:7 21:9 94:21 132:4 153:1 153:6,12 160:15 162:15 212:19 239:10 246:5 western 1:18 4:15 6:22 62:11 169:15 169:21 whistle 232:18,19 WHITE 251:4 wholesale 122:9 167:22 wide 22:4 widely 12:14 widespread 93:14 138:20 166:19 wield 199:5 willful 39:19 41:19 116:20 263:17 willing 136:9 234:8 willingness 183:9 Willis 226:2,2,3,4 227:16 Wilson 122:15 123:13,16,17,18 164:13 192:1 window 31:18 wish 90:6

202-234-4433 Neal R. Gross and Co., Inc. Page 313 withdrawal 266:4 withhold 244:9,9 won 166:22 wonder 96:3,12 148:20 175:2 wondered 90:8 word 103:14 words 184:16 200:3 work 7:4,5 11:7,12 13:5 18:6 21:14 22:15 23:22 29:6 36:4 53:9,11,12 56:4,7 60:7 78:11 85:12 86:18 102:8 102:9 104:9 115:20 116:4,7,7 117:12 123:2 124:4,5 127:6,9 132:8,14 133:10 138:12 140:20 141:9 175:1 176:11 183:9 187:22 191:3,4 193:22 207:4,4,18 207:19 211:20,22 212:8 223:22 230:16 241:19 244:13 249:7 255:20,21 256:1 259:10,16 265:13 270:10,11,19 272:19 274:16 workability 178:16 worked 30:17 49:13 103:9 153:9 190:15 216:14 232:7 236:1 worker 42:19 96:3 96:10 100:1 103:10 104:4,19 105:9,10,14,18,18 113:12,22 115:12 122:20 124:19 126:8,21 127:16 129:11 131:14 174:16 175:17 206:21 224:20 243:18 workers 6:13,14 11:14 18:15 28:17 41:22 42:3 43:1 47:20 48:16 54:9 84:11,20 96:6 103:3,17,20 104:21 105:21 106:3 117:17 119:13 121:2 124:18 129:4 139:18 140:16,19 141:2 154:12 164:17 165:4 166:3,10 167:4,4 167:11 168:5,15 168:19 170:11 174:1 175:12,19 176:4,14 177:15 182:11,17 190:16 196:16 203:21 205:13,16 210:2 214:12 225:3 227:2 228:3,21 232:15 242:5 244:3 265:7,10 workforce 71:12 77:11,18 85:16 97:12 99:2 101:14 182:15 214:8 237:12 working 8:2 14:22 25:13 30:20 37:16 43:19 62:4 88:14 89:7 113:3,5,14 113:17 114:4,15 116:8,13 119:20 121:7 122:14 132:5 136:5 143:4 156:5,7 172:19,21 173:16 183:20 192:16 196:15 203:4 220:21 221:5 233:1 238:18 247:11 254:21 workplace 102:22 workplaces 141:6,8 works 15:9 97:2 Worksafe 190:4,12 world 8:20 34:9 68:12 93:15 103:10 208:18,18 worldwide 8:14 88:8 133:7 worried 219:22 worse 242:19 worth 37:7 55:21 106:10 206:15 wouldn't 252:21 Wright 22:14 writes 147:22 174:6 187:14,21 writing 105:21 164:2 written 75:8 82:17 89:1 105:15 132:3 170:17 177:20 178:10 180:20 181:1,5,6 191:11 217:1,2 230:9 270:15 wrong 3:14 43:9 169:1 246:19 WSPA 170:17 171:6 173:7,14 208:2 238:20 X XRE's 134:14 Y year 15:7 17:16 39:13 40:21 41:18 43:1 56:12,14 116:11 128:6,9 130:10,14 152:14 173:9 239:5 254:18 255:13 260:15 years 11:1 16:2 17:6 21:5 29:10 33:11 41:10 46:2 56:18,18 57:10 62:4 66:17 67:12 70:4 76:1 81:20 91:20 106:10 131:4 138:22 143:1 153:9,22 155:14 158:13 160:20 166:3 178:22 182:9 185:14 196:15 208:1 213:12,17 216:15 219:8 226:13,15 236:1 246:7 253:18 260:8 yesterday 14:15 21:8 258:15 young 236:4 Z 0 1 1 8:8 68:21 82:6 10,000 168:18 100 38:21 104 165:11 11 2:3 39:18 116:19 111 2:17 112R 148:9 12 195:9 226:13 120 266:12 125 7:19 65:14 203:7 12898 157:13 12th 34:17 242:19 13 8:21 113:6 125:11 13650 25:14 88:21 132:2 160:14 183:16 14 14:4 69:8 15 1:7 7:2 66:10,17 73:9 174:22 15,000 28:14 65:10 203:10 227:1 235:14,15 251:16 251:19 150 100:21 165 195:7 16th 5:8,20 17 203:7 18 2:4 124:18 19 28:16 65:8 227:2 1977 84:16 1990s 135:7 1993 161:12 1996 84:18 1999 66:6 135:5,15 19th 41:7 2 2 69:12 86:16 2,000 127:22 20 29:10 70:4 131:4 142:22 185:14 20-some 175:9 20,000 161:14 2002 135:6 226:12 2005 8:15 9:2 13:19 66:9,11 2006 14:3 2010 66:12 2012 7:19 19:3 28:7 29:7 32:3 38:17 43:7 53:22 62:8 64:15 65:14 113:1 116:16 135:11,21 136:21 203:7,9 204:4 226:12,15 228:12 243:7 251:17 253:20 2012031 262:5,11 20120311CAR22 262:9 2012031CAR21 262:8 2013 5:8 19:6 40:13 41:7 48:13 49:7 49:19 53:13 54:13 113:13 115:19 116:18,22 117:10 127:20 130:8 208:11 2014 1:7 40:19 2015 92:9

202-234-4433 Neal R. Gross and Co., Inc. Page 314 22 226:18 236:1 24 253:1 257:1 25 39:17 116:19 128:6 246:7 258:20 26 2:5 261 2:19 26th 161:12 27 256:16 3 3 2:3 70:5 88:12 3,600 128:3 3:49 261:15 3:53 261:16 30 153:9 300 128:13 30th 116:18 33 2:6 34 216:15 350 238:17 36 2:6 52:5 38 45:17 3rd 5:20 170:19 4 4 70:17 4:07 274:20 40 213:17 45 260:14 47 243:15 48 2:7 4th 40:13 5 5 6:13 71:10 5,000 138:10 50 19:14 175:9 55 2:7 550 142:3 5th 116:22 6 6 72:1 6:30 3:2 62 2:9 67 2:9 675 138:9 6th 28:7 32:3 38:17 43:7 57:16 60:13 64:15 113:1 117:4 135:11,21 136:20 203:9 204:4 228:12 251:17 253:20 7 7 72:18 70 177:13 74 2:10 75 175:7 8 800 249:13 805 195:3 82 2:12 89 2:14 9 900 195:6

NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W. (202) 234-4433 WASHINGTON, D.C. 20005-3701 www.nealrgross.com

C E R T I F I C A T E

MATTER:

DATE:

I hereby certify that the attached transcription of pages to inclusive are to the best of my belief and ability a true, accurate, and complete record of the above referenced proceedings as contained on the provided audio recording.

315 Chevron Richmond Refinery 01-15-14 1 315

FD06466 | 2014_美国_DuPont La Porte 设施 有毒 化学品 泄漏 - DuPont La Porte Facility Toxic Chemical Release__最终报告_2.pdf

分类:06_境外及港澳台调查报告 | 年份:2014 | 地域: | 严重程度: | 场所:化工/石化 | 起火原因:燃气/爆炸 | 来源格式:pdf

Investigation Report Toxic  Chemical  Release  at  the   DuPont  La  Porte  Chemical  Facility  

La  Porte,  Texas  |  Incident  Date:  November  15,  2014  |  No.  2015-­01-­I-­TX   U.S.  Chemical  Safety  and   Hazard  Investigation  Board   Investigation  Report   Published:  June  2019

KEY  ISSUES:     • Emergency  Planning  and  Response   (Preparedness)   • Implementation  of  Process  Safety   Management  Systems   •   Assessment  of  Process  Safety  Culture  

  Page  2  

La  Porte,  Texas  |  Incident  Date:  November  15,  2014  |  No.  2015-­01-­I-­TX   U.S.  Chemical  Safety  and   Hazard  Investigation  Board   Toxic  Chemical  Release  at  the   DuPont  La  Porte  Chemical  Facility   The U.S. Chemical Safety and Hazard Investigation Board (CSB) is an independent federal agency whose mission is to drive chemical safety change through independent investigations to protect people and the environment. The CSB is a scientific investigative organization, not an enforcement or regulatory body. Established by the Clean Air Act Amendments of 1990, the CSB is responsible for determining accident causes, issuing safety recommendations, studying chemical safety issues, and evaluating the effectiveness of other government agencies involved in chemical safety. More information about the CSB is available at www.csb.gov. The CSB makes public its actions and decisions through investigative publications, all of which may include safety recommendations when appropriate. Types of publications include: Investigation Reports: Formal, detailed reports on significant chemical incidents that include key findings, root causes, and safety recommendations Investigation Digests: Plain-language summaries of Investigation Reports Case Studies: Reports that examine fewer issues than Investigation Reports Safety Bulletins: Short publications typically focused on a single safety topic Hazard Investigations: Broader studies of significant chemical hazards Safety Videos: Videos that animate aspects of an incident or amplify CSB safety messages CSB products can be freely accessed at www.csb.gov or obtained by contacting: U.S. Chemical Safety and Hazard Investigation Board Office of Congressional, Public, and Board Affairs 1750 Pennsylvania Ave NW, Suite 910 Washington, DC 20006 (202) 261-7600 No part of the conclusions, findings, or recommendations of the Board relating to any accidental release or the investigation thereof shall be admitted as evidence or used in any action or suit for damages arising out of any matter mentioned in such report. See 42 U.S.C. § 7412(r)(6)(G).

  Page  3    

La  Porte,  Texas  |  Incident  Date:  November  15,  2014  |  No.  2015-­01-­I-­TX   U.S.  Chemical  Safety  and   Hazard  Investigation  Board   Toxic  Chemical  Release  at  the   DuPont  La  Porte  Chemical  Facility   TABLE  OF  CONTENTS     1   EXECUTIVE  SUMMARY..............................................................................................................................................  7   2    INCIDENT  DESCRIPTION  .........................................................................................................................................  12     METHYL  MERCAPTAN  RELEASE  ...............................................................................................................................  13     EMERGENCY  RESPONSE  .........................................................................................................................................  20   3   DELAYED  AWARENESS  OF  TOXIC  CHEMICAL  RELEASE  BY  OPERATIONS  ..................................................................  27   4   EMERGENCY  RESPONSE  OPERATIONS  ....................................................................................................................  30     ERT  BACKGROUND  ..............................................................................................................................................  31     PROCESS  COORDINATOR  WAS  MISSING  ....................................................................................................................  33     DELAY  IN  ERT  READINESS  TO  SEARCH  FOR  MISSING  WORKERS  .......................................................................................  36   4.3.1   Call  for  ERT  Response  ..................................................................................................................................  36   4.3.2   ERT  Mini-­‐Pumper  Truck  Not  Operational  .....................................................................................................  37     THE  SEARCH  FOR  MISSING  WORKERS  WAS  HIGH  RISK  ..................................................................................................  38   4.4.1   Entry  into  Potentially  Explosive  Atmosphere  ................................................................................................  38   4.4.2   No  Technology  to  Locate  Missing  Workers  ..................................................................................................  40   4.4.3   Unrecognized  Manufacturing  Building  Collapse  Hazard  ...............................................................................  41     DIFFICULTIES  NAVIGATING  MANUFACTURING  BUILDING  ................................................................................................  42     NO  ANALYSIS  OF  PROCESS  DATA  TO  IDENTIFY  SOURCE  OF  LEAK.......................................................................................  45     INADEQUATE  CREATION  AND  CONTROL  OF  HOT  ZONE  ..................................................................................................  48     DEFICIENCIES  IN  EVALUATING  RISK  TO  THE  PUBLIC  .......................................................................................................  50   4.8.1   Release  Modeling  .......................................................................................................................................  51   4.8.2   Physical  Properties  of  Methyl  Mercaptan  ....................................................................................................  54   4.8.3   Chemical  Sensor  Data  .................................................................................................................................  56   4.8.4   Air  Monitoring  ............................................................................................................................................  57     EMERGENCY  RESPONSE  CONCLUSIONS  ......................................................................................................................  58   5   DUPONT’S  PROCESS  SAFETY  MANAGEMENT  SYSTEM  ............................................................................................  59     OSHA  ..............................................................................................................................................................  60   5.1.1   The  Process  Safety  Management  Standard  .................................................................................................  60   5.1.2   DuPont  La  Porte’s  Implementation  of  PSM  ..................................................................................................  61   5.1.3   Recent  Developments  Affecting  the  PSM  Standard  ......................................................................................  63     ENVIRONMENTAL  PROTECTION  AGENCY  ....................................................................................................................  63   5.2.1   Risk  Management  Plan  Rule........................................................................................................................  63   5.2.2   DuPont  La  Porte’s  Implementation  of  RMP  ..................................................................................................  65   5.2.3   Recent  Developments  Affecting  the  RMP  Rule  .............................................................................................  65     AMERICAN  CHEMISTRY  COUNCIL  .............................................................................................................................  67   5.3.1   History  of  Responsible  Care  .........................................................................................................................  68   5.3.2   Responsible  Care  Requirements  ..................................................................................................................  69   5.3.3   Responsible  Care  Conformance  Audits  ........................................................................................................  71  

  Page  4  

La  Porte,  Texas  |  Incident  Date:  November  15,  2014  |  No.  2015-­01-­I-­TX   U.S.  Chemical  Safety  and   Hazard  Investigation  Board   Toxic  Chemical  Release  at  the   DuPont  La  Porte  Chemical  Facility   5.3.4   Recent  Developments  in  Responsible  Care  ...................................................................................................  74   5.3.5   Responsible  Care  Improvement  Opportunities  .............................................................................................  75     DUPONT’S  DEVELOPMENT  AND  IMPLEMENTATION  OF  ITS  PROCESS  SAFETY  MANAGEMENT  SYSTEM  ........................................  78   5.4.1   Building  a  Safety  Culture  .............................................................................................................................  80   5.4.2   Using  the  Process  Safety  Management  and  Risk  Model  ...............................................................................  90     DUPONT’S  PROCESS  SAFETY  MANAGEMENT  SYSTEM  CONCLUSIONS  ................................................................................  92   6   PROCESS  SAFETY  MANAGEMENT  DEFICIENCIES......................................................................................................  92     PROCESS  HAZARD  ANALYSIS  EVALUATION  ..................................................................................................................  93     IMPLEMENTATION  OF  CORRECTIVE  ACTIONS  ...............................................................................................................  96     PROCESS  SAFETY  PRACTICES  DURING  TROUBLESHOOTING  OPERATIONS  .............................................................................  99     MOC  PRACTICES  ..............................................................................................................................................  101   6.4.1   No  MOC  for  Heating  Piping  or  for  New  Piping  Alignment  ...........................................................................  102   6.4.2   No  MOC  for  New  Piping  Alignment  to  Nitrogen  Relief  Valves  .....................................................................  105   6.4.3   No  MOC  or  Procedure  for  Vent  Header  Draining  Operation  .......................................................................  106     LINE-­‐BREAKING  PRACTICES  ..................................................................................................................................  109     SHIFT  COMMUNICATION  PRACTICES  .......................................................................................................................  113   7   ADDITIONAL  FACTS,  CONDITIONS,  AND  CIRCUMSTANCES  IDENTIFIED  .................................................................  114     EMPLOYEE  INCENTIVE  PROGRAM  ...........................................................................................................................  115   8   KEY  FINDINGS  .......................................................................................................................................................  120   9   SAFETY  GUIDANCE  ................................................................................................................................................  121   10   RECOMMENDATIONS  ...........................................................................................................................................  124     DUPONT  LA  PORTE,  TEXAS,  CHEMICAL  FACILITY  .......................................................................................................  125     LOCAL  900C  OF  THE  INTERNATIONAL  CHEMICAL  WORKERS  UNION  COUNCIL  (ICWUC)  OF  THE  UNITED  FOOD  AND  COMMERCIAL   WORKERS  (UFCW)  .......................................................................................................................................................  126   REFERENCES  ..................................................................................................................................................................  128   APPENDIX  A:  CAUSAL  ANALYSIS....................................................................................................................................  144   APPENDIX  B:  INCIDENT  TIMELINE  .................................................................................................................................  145   APPENDIX  C:  ODOR  COMPLAINTS  FROM  NOVEMBER  15,  2014  .....................................................................................  150   APPENDIX  D:  EMERGENCY  RESPONSE  TABLES  ..............................................................................................................  151   APPENDIX  E:  DUPONT  SAFETY  PERCEPTION  SURVEYS...................................................................................................  156  

  Page  5    

La  Porte,  Texas  |  Incident  Date:  November  15,  2014  |  No.  2015-­01-­I-­TX   U.S.  Chemical  Safety  and   Hazard  Investigation  Board   Toxic  Chemical  Release  at  the   DuPont  La  Porte  Chemical  Facility   ACRONYMS  AND  INITIALISMS  

AAO ACC AEGL API acetaldehyde oxime American Chemistry Council acute exposure guideline level American Petroleum Institute CCPS CCTV Center for Chemical Process Safety closed circuit television CSB U.S. Chemical Safety and Hazard Investigation Board DCS DOT distributed control system U.S. Department of Transportation EMT EPA EOC ERPGs emergency medical technician U.S. Environmental Protection Agency Emergency Operations Center Emergency Response Planning Guidelines ERT FBU FEMA HAZCOM HAZWOPER emergency response team Fluoroproducts Business Unit U.S. Federal Emergency Management Agency Hazard Communication Standard Hazardous Waste Operations and Emergency Response Standard IBU ICWUC IDLH Insecticide Business Unit International Chemical Workers Union Council Immediately Dangerous to Life or Health LEL LFL LPBC lower explosive limit lower flammability limit Local Performance Based Compensation program MeSH methyl mercaptan MIC MOC methyl isocyanate management of change MSDS material safety data sheet

  Page  6  

La  Porte,  Texas  |  Incident  Date:  November  15,  2014  |  No.  2015-­01-­I-­TX   U.S.  Chemical  Safety  and   Hazard  Investigation  Board   Toxic  Chemical  Release  at  the   DuPont  La  Porte  Chemical  Facility   NAICS mph NEP North American Industrial Classification System miles per hour National Emphasis Program NFPA NIMS NIOSH National Fire Protection Association National Incident Management System National Institute for Occupational Safety and Health NRS NOx (nitrogen oxides) reduced scrubbed OSHA OSH Act U.S. Occupational Safety and Health Administration U.S. Occupational Safety and Health Act of 1970 PEL permissible exposure limit PHA ppb PPE process hazard analysis parts per billion personal protective equipment ppm parts per million PSM RCMS RCS REL Process Safety Management Responsible Care Management System® Relative Culture Strength recommended exposure limit RMP Risk Management Plan SCBA SDS self-contained breathing apparatus safety data sheet SHI TWA Substance Hazards Index Time-Weighted Average UFCW United Food and Commercial Workers

  Page  7    

La  Porte,  Texas  |  Incident  Date:  November  15,  2014  |  No.  2015-­01-­I-­TX   U.S.  Chemical  Safety  and   Hazard  Investigation  Board   Toxic  Chemical  Release  at  the   DuPont  La  Porte  Chemical  Facility   1   EXECUTIVE  SUMMARY   On November 15, 2014, approximately 24,000 poundsa of highly toxic methyl mercaptan was released from an insecticide productionb unit (Lannate® Unit) at the E. I. du Pont de Nemours and Company (DuPont) chemical manufacturing facility in La Porte, Texas.c The release killed three operators and a shift supervisor inside a manufacturing building.d They died from a combination of asphyxia and acute exposure (by inhalation) to methyl mercaptan. The CSB determined that the cause of the highly toxic methyl mercaptan release was the flawed engineering design and the lack of adequate safeguards.e Contributing to the severity of the incident were numerous safety management system deficiencies, including deficiencies in formal process safety culture assessments, auditing and corrective actions, troubleshooting operations, management of change, safe work practices, shift communications, building ventilation design, toxic gas detection, and emergency response. Weaknesses in the DuPont La Porte safety management systems resulted from a culture at the facility that did not effectively support strong process safety performance. The highly toxic methyl mercaptan release resulted from a long chain of process safety management system implementation failures stemming from ineffective implementation of the process safety management system at the DuPont La Porte facility. The CSB investigation viewed the chain of implementation failures as starting with the flawed engineering design of the $20 million nitrogen oxides (NOx) reduced scrubbed (NRS) incinerator, a capital project implemented in 2011. DuPont La Porte had long-standing issues with vent piping to this incinerator because the design did not address liquid accumulation in waste gas vent header vapor piping to the NRS, and DuPont La Porte did not fully resolve the liquid accumulation problem through hazard analyses or management of change reviews. Instead, to deal with these problems, daily instructions had been provided to operations personnel to drain liquid from these pipes to the atmosphere inside the Lannate® manufacturing building without specifically addressing the potential safety hazards this action could pose to the workers. DuPont La Porte’s instructions did

a 29 C.F.R. § 1910.119 Appendix A (2013). b The Insecticide Business Unit (IBU) was divided into two primary insecticide product lines: Lannate®, which is DuPont’s trade name for methomyl, and agricultural products intermediates, which were used to produce insecticides and nematicides known as Vydate®, the trade name for oxamyl [1, p. 11]. c Multiple business units were located at the DuPont La Porte site. The Lannate® Unit was part of the IBU. In addition to the IBU, the facility had an Herbicides Business Unit and a Fluoroproducts Business Unit (FBU). The FBU included an anhydrous hydrogen fluoride (HF) manufacturing unit. FBU assets were sold to Chemours on July 1, 2015. d The victims included operators Robert Tisnado (39), Gilbert Tisnado (48), Crystle Wise (53), and shift supervisor Wade Baker (60). One victim on the third floor was located near a methyl mercaptan leak source on the wet end (east) side. The other two victims on the third floor were on the dry end (west) side. The IBU was further subdivided into four functional areas: the wet end, the MIC (methyl isocyanate) area, the damp end, and the dry end. The wet end contained liquid reaction equipment. The MIC area contained equipment to generate and consume the MIC intermediate. The damp end isolated and dried insecticide crystals. The dry end processed the crystals and packaged them into various products [1, pp. 10-11]. e In September 2018, the CSB produced a Winterization Safety Digest that discussed DuPont La Porte’s lack of safeguards to prevent methyl mercaptan hydrate formation [173, p. 1].

  Page  8  

La  Porte,  Texas  |  Incident  Date:  November  15,  2014  |  No.  2015-­01-­I-­TX   U.S.  Chemical  Safety  and   Hazard  Investigation  Board   Toxic  Chemical  Release  at  the   DuPont  La  Porte  Chemical  Facility   not specify additional breathing protection for this task (Section 6.4.3 and Interim Recommendations) [1, p. 18]. On the night of the incident, not realizing the hydrate blockage in the methyl mercaptan feed piping was cleared, workers went to drain liquid from the waste gas vent piping. They did not know that high pressure in the waste gas vent piping was related to the fact that liquid methyl mercaptan was flowing through the methyl mercaptan feed piping and into the waste gas vent piping. The chain further developed when the ineffective building ventilation system failed to be addressed after DuPont auditors identified it as a safety concern about five years before the incident. DuPont La Porte’s management system did not resolve the process safety management recommendation (i.e., did not take corrective action) to address the building ventilation system (Section 6.1 and Interim Recommendations) [1, p. 34]. The ventilation design for the manufacturing building was based on flammability characteristics and did not take into consideration toxic chemical exposure hazards, even though the building contained two highly toxic materials, chlorine and methyl mercaptan. DuPont La Porte records indicated that the manufacturing building’s dilution air ventilation design was based on providing sufficient ventilation to ensure that the concentration of flammable gases did not exceed 25 percent of the lower explosion limit (LEL).a At the time of the incident, neither of the manufacturing building’s two rooftop ventilation fans was working, despite an “urgent” work order written nearly a month earlier. Even had the fans worked, they probably would not have prevented a lethal atmosphere inside the building due to the large amount of toxic gas released (Section 5.4.1.2 and Interim Recommendations) [1, pp. 3, 33-34]. DuPont La Porte’s installation of a methyl mercaptan detection system inside the manufacturing building added another link to the chain. Neither the workers nor the public was protected by DuPont’s toxic gas detection system on the night of the incident. The building where the workers died was not equipped with an adequate toxic gas detection system to alert personnel to the presence of dangerous chemicals. First, DuPont La Porte set the detector alarms well above safe exposure limits for workers. Second, DuPont La Porte relied on verbal communication of alarms that automatically displayed on a continuously manned control board. Finally, DuPont La Porte did not provide visual lights or audible alarms for the manufacturing building to warn workers of highly toxic gas concentrations inside it. When a release caused a detector to register a concentration above the alarm limit, the toxic gas detection system did not warn workers in the field about the potential leak and the need to evacuate. Among other factors, this detection system contributed to workers’ growing accustomed to smelling the methyl mercaptan odor in the unit. Additionally, when the toxic gas detectors triggered alarms, DuPont La Porte personnel investigated potential methyl mercaptan leaks without using respiratory protection. Personnel normalized unsafe methyl mercaptan detection practices by using odor to detect the gas, further

a DuPont records indicate that the manufacturing building ventilation system design code is NFPA 497, Recommended Practice for the Classification of Flammable Liquids, Gases, or Vapors and of Hazardous (Classified) Locations for Electrical Installations in Chemical Process Areas. NFPA 497 defines adequate ventilation as that sufficient to ensure that the concentration of flammable gases does not exceed 25 percent of the lower flammability limit (also referred to as lower explosion limit (LEL)) [136, p. 9]. However, there were no LEL detectors to monitor the atmospheric conditions inside the manufacturing building and alert workers of potential fire or explosion conditions. Furthermore, a methyl mercaptan concentration of 25 percent of the LEL is equivalent to 65 times greater than the 150 parts per million concentration that is considered immediately dangerous to life or health (IDLH).

  Page  9    

La  Porte,  Texas  |  Incident  Date:  November  15,  2014  |  No.  2015-­01-­I-­TX   U.S.  Chemical  Safety  and   Hazard  Investigation  Board   Toxic  Chemical  Release  at  the   DuPont  La  Porte  Chemical  Facility   deteriorating the importance or effectiveness of utilizing instrumentation in response to alarms signaling potential toxic gas releases (Section 3 and Interim Recommendations) [1, pp. 38-39]. In the spring of 2014, the chain propagated when DuPont La Porte’s interlock program did not require verification that interlocks that had been bypassed for turnaround maintenance were returned to service before the plant resumed operating. Because of this ineffective program, a bypassed interlock caused acetaldehyde oxime (AAO), a critical raw material, to become diluted, leading to a shutdown of the Lannate® Unit days before the November 2014 incident.a During the shutdown, water entered the methyl mercaptan feed piping and, due to the cold weather, formed a hydrate (an ice-like material) that plugged the piping and prevented workers from restarting the unit. Furthermore, DuPont La Porte did not establish adequate safeguards after a 2011 DuPont La Porte process hazard analysis identified hydrate formation in this piping, revealing yet another link in the chain (Section 6.1 and Interim Recommendations) [1, p. 22]. When the hydrate formed, lacking safeguards to control the potential safety hazards associated with dissociating (breaking up) the hydrate (such as using heat tracing to prevent the hydrate from forming a solid inside the piping or developing a procedure to dissociate the hydrate safely), DuPont workers went into troubleshooting mode (Section 6.3). Ineffective hazard management while troubleshooting the plugged methyl mercaptan feed piping formed yet another link in the chain and allowed liquid methyl mercaptan to flow into the waste gas vent header piping toward the NRS incinerator—a location where it was never intended to go (Section 6.4.1 and Interim Recommendations) [1, pp. 25-26]. As discussed earlier, DuPont La Porte did not fully resolve liquid accumulation in the waste gas vent header by the NRS incinerator. Consequently, DuPont La Porte workers dealt with the common problem of liquid accumulation in the waste gas vent header on a routine basis by draining the liquid (line breaking) without an engineered solution or without ensuring the use of safety procedures or personal protective equipment (Section 6.4.3 and Interim Recommendations) [1, pp. 18, 28]. However, when the liquid drain valves were opened on November 15, 2014, flammable and highly toxic methyl mercaptan flowed onto the floor and filled the manufacturing building with toxic vapor. Once the methyl mercaptan release began, an ineffective emergency response program at La Porte contributed to the extent and duration of the chemical release, placed other workers in harm’s way, and did not effectively evaluate whether the chemical release posed a safety threat to the public (Section 3 and Section 4).

a During the AAO truck unloading, a block valve downstream of what should have been an out-of-service water dilution control valve was inadvertently opened, allowing water to flow into the tank. The water dilution system had been installed in 2006 when container shipments of 100 percent AAO were judged to be more economical than diluted AAO. AAO is now typically purchased and stored as a 50 percent solution with water. A logistical problem resulted in an unusual delivery of 50 percent AAO by tank truck instead of by railcar. Two factors contributed to the tank overflow incident. First, DuPont did not have a procedure for unloading a 50 percent tank truck of AAO. Second, the AAO water dilution control valve was supposed to interlock closed when (1) the truck-unloading pump was off or (2) the AAO tank had a high liquid level. However, the interlock function had been bypassed in the field so that water could be used to decontaminate the tank during the turnaround in spring 2014. Instrument air supply tubing was connected directly to the interlock valve actuator, bypassing the interlock activation solenoid, and forcing the valve to remain fully open. The interlock could not function because the bypass was not removed at the completion of the turnaround [1, p. 33]. DuPont defines a safety interlock as a system or function that detects an out-of-limits (abnormal) condition or improper sequence and brings it to a safe condition [1, p. 38].

  Page  10  

La  Porte,  Texas  |  Incident  Date:  November  15,  2014  |  No.  2015-­01-­I-­TX   U.S.  Chemical  Safety  and   Hazard  Investigation  Board   Toxic  Chemical  Release  at  the   DuPont  La  Porte  Chemical  Facility   This chain of events illustrates DuPont La Porte’s ineffective implementation of its process safety management system. The individual components of this process safety management system exhibited cross-cutting weaknesses, resulting in the deaths of four workers and leading to the ultimate decision to close the DuPont La Porte facility. The DuPont La Porte incident is the CSB’s third investigation of a fatal DuPont incident in five years.a On September 30, 2015, the CSB issued a presentation, a safety video, and an Interim Recommendations report [1], which detailed needed safety improvements at the DuPont La Porte facility and issued recommendations for implementation before resuming operations of the Lannate® Unit [2].b Due to the amount of methyl mercaptan stored at the DuPont La Porte site, the Lannate® process was covered by the Process Safety Management (PSM) standard of the U.S. Occupational Safety and Health Administration (OSHA) and the Risk Management Plan (RMP) rule of the U.S. Environmental Protection Agency (EPA) [3]. In the Interim Recommendations, the CSB identified significant process safety management deficiencies at the La Porte facility, including delayed maintenance of safety-critical equipment, lack of written procedures, poor hazard analysis practices, lack of implementation of important inherently safer design concepts, and a lack of hazard recognition [1]. In response to the CSB findings and recommendations, DuPont committed to making changes at the La Porte facility. DuPont La Porte, however, was not able to address all of these findings and recommendations, because in the spring of 2016 DuPont announced that it would not reopen the Lannate® Unit. The company had determined that “significant changes in market conditions during the period of the shutdown [would] persist over the long term” [4] and that the cost required for the restart was “not a long-term viable and cost-efficient option for the DuPont Crop Protection business” [5]. In 2017, DuPont dismantled and removed from the DuPont La Porte facility the buildings and equipment that had been associated with its insecticide and herbicide business units, including the Lannate® Unit.c Despite the closure of the insecticide and herbicide units, the CSB determined that the DuPont La Porte incident offers important lessons for the chemical industry relating to the following areas: •   Emergency Response. The emergency response efforts at the DuPont La Porte facility during the toxic chemical release were disorganized and placed at risk operators, emergency responders, and potentially the public. Chemical plants need a robust emergency response program to mitigate emergencies and to protect the health of workers, emergency responders, and the public.d

a The CSB also investigated an incident at a DuPont plant in Belle, West Virginia (three incidents that occurred in a 33-hour period over January 22–23, 2010, resulting in one fatality) [121], and another in Buffalo, New York (a single incident that occurred on November 9, 2010, resulting in one fatality and one serious injury) [122]. b This report incorporates by reference the DuPont La Porte Interim Recommendations [1]. c Although DuPont dismantled the La Porte Crop Protection business, DuPont La Porte still operates as a landlord to other companies located at the La Porte site and provides wastewater treatment and utilities, as well as owning the emergency response program. d Emergency response and planning is one of five key safety topics that the CSB found needed improvement across industry nationwide; as a result, the CSB included that topic in its Drivers of Critical Chemical Safety Change program. Inadequate or poor emergency planning or response is a recurring finding in CSB investigations. At least 17 CSB incident investigations, including this one, identified emergency response deficiencies, resulting in 46 emergency response recommendations [33].

  Page  11    

La  Porte,  Texas  |  Incident  Date:  November  15,  2014  |  No.  2015-­01-­I-­TX   U.S.  Chemical  Safety  and   Hazard  Investigation  Board   Toxic  Chemical  Release  at  the   DuPont  La  Porte  Chemical  Facility   •   DuPont’s Process Safety Management System. DuPont created its own corporate process safety management system that integrated its internal safety requirements with those of the American Chemistry Council’s Responsible Care® programa and those required by regulations under the EPA RMP rule and the OSHA PSM standard. Over the course of five years, despite implementing its corporate process safety management system, DuPont experienced three major process safety incidents. In addition to developing an integrated process safety management system, DuPont established a program to implement it. According to DuPont, the implementation of the process safety management system can be broken down into two parts: (1) Building a Safety Culture and (2) Using the Process Safety Management and Risk Model. Although DuPont’s corporate standard recommended that its sites assess their process safety culture, DuPont La Porte had not formally evaluated process safety culture at its facility before the November 2014 incident. DuPont La Porte used a proprietary Safety Perception Survey that focused on personal or occupational safety but did not evaluate or assess the process safety culture. Because the Safety Perception Survey did not reasonably evaluate all safety aspects of culture, it could not help identify the significant process safety weaknesses at the DuPont La Porte facility, leaving the site vulnerable to potential process safety incidents. While measuring worker perceptions of personal safety is important, a safety culture assessment program should also provide an effective gauge of process safety. The second tool that DuPont used to implement its process safety management system was the Process Safety Management and Risk Model, the company’s visual representation of an effective process safety management system, showing the implementation and interaction of Management Leadership and Commitment, Comprehensive Process Safety Management Program, and Operational Discipline. •   DuPont La Porte’s Process Safety Management Deficiencies. The CSB identified significant process safety deficiencies at the DuPont La Porte site that contributed to the incident. DuPont’s corporate process safety management system did not identify, prevent, or mitigate these deficiencies. A company must effectively implement a process safety management system and its corresponding programs to reap the accompanying process safety benefits. •   DuPont La Porte’s Employee Incentive Program. The DuPont La Porte bonus structure may have disincentivized workers from reporting injuries, incidents, and “near misses.” Ensuring that employees can report injuries or incidents in accordance with the Occupational Safety and Health (OSH)Act and OSHA regulations, without fear of discrimination, retaliation, or other adverse consequence is central to protecting worker safety and health, and aiding accident prevention.

a The American Chemistry Council (ACC) is a trade group that represents chemical companies. ACC’s Responsible Care Program is a voluntary industry program.

  Page  12  

La  Porte,  Texas  |  Incident  Date:  November  15,  2014  |  No.  2015-­01-­I-­TX   U.S.  Chemical  Safety  and   Hazard  Investigation  Board   Toxic  Chemical  Release  at  the   DuPont  La  Porte  Chemical  Facility   This report encourages legacy DuPonta sites to strengthen employee incentive programs. It additionally presents a set of recommendations to the DuPont La Porte facility and Local 900C of the International Chemical Workers Union Council (ICWUC) of the United Food and Commercial Workers (UFCW) to improve emergency preparedness and response at the La Porte facility. Based on the CSB’s investigative findings related to emergency response, process safety management systems, and incentive programs (see Appendix A: Causal Analysis), this report presents lessons for the chemical industry in Guidance to Industry sections and summarizes them at the end of the report in Section 9: Safety Guidance.

2    INCIDENT  DESCRIPTION   The November 15, 2014 incident occurred in DuPont La Porte’s Lannate®b Unit, which produced insecticides. Part of the Lannate® process occurred inside a closed building (the manufacturing building)

a DuPont and Dow completed a merger of equals on August 31, 2017. The combined entity operated as a holding company called DowDuPont [105]. On April 1, 2019, DowDuPont successfully completed the spin-off of its Material Science division, Dow. DowDuPont intends to separate its Agriculture and Specialty Products divisions into independent, publicly traded companies by June 2019, subject to board approval [134]. b Lannate® is the DuPont trade name for methomyl, an insecticide [94, p. 1]. For more detail on the incident, see public meeting presentation, DuPont La Porte animation, public meeting transcript, and Interim Recommendations report [2].

Figure  1.    The  Lannate®  Manufacturing  Building.    The  methyl   mercaptan  release  occurred  in  the  manufacturing  building.    Source:   CSB.  

  Page  13    

La  Porte,  Texas  |  Incident  Date:  November  15,  2014  |  No.  2015-­01-­I-­TX   U.S.  Chemical  Safety  and   Hazard  Investigation  Board   Toxic  Chemical  Release  at  the   DuPont  La  Porte  Chemical  Facility   (Figure 1),a where most of the methyl mercaptan release occurred.b The Lannate® process used methyl mercaptan, a toxic and flammable chemical.c,d The sections below discuss the eventse leading to the methyl mercaptan release and the subsequent emergency response.   METHYL  MERCAPTAN  RELEASE   On Monday, November 10, 2014, an inadvertent chemical dilution caused operating difficulties that forced a shutdown of DuPont’s Lannate® Unit.f In response, DuPont La Porte personnel adjusted the unit’s control system to resume operations. On Wednesday, November 12, 2014, operators tried to restart the Lannate® process. During the shutdown, the methyl mercaptan piping to the reaction section of the process had become plugged due to the formation of a clathrate hydrate (hydrate),g halting restart. At that time, operators did not

a Chlorine and methyl isocyanate (MIC) were also used in the manufacturing building. b Although the bulk of the release occurred inside the manufacturing building, methyl mercaptan was also released from the nitrogen relief valves located at the methyl mercaptan railcar spots. c Symptoms of methyl mercaptan toxicity include narcosis (a state of stupor, drowsiness, or unconsciousness) and cyanosis (blue or purple coloration of the skin or mucous membranes caused by inadequate oxygenation of the blood) [50]. Methyl mercaptan is also a chemical asphyxiant [95]. Chemical asphyxiants are toxic agents that prevent red blood cells from carrying oxygen [90, p. 58]. The OSHA ceiling exposure limit is 10 parts per million (ppm). OSHA recommends that employers consider using the alternative occupational exposure limits because the agency believes that exposures above some of these alternative occupational exposure limits may be hazardous to workers, even when the exposure level complies with the relevant permissible exposure limit (PEL) [162]. The Division of Occupational Safety and Health of California (Cal-OSHA) PEL is an 8-hour time-weighted average (TWA) of 0.5 ppm, and the National Institute of Occupational Safety and Health (NIOSH) recommends a recommended exposure limit (REL) of a 15-minute ceiling limit of 0.5 ppm [163]. Methyl mercaptan is immediately dangerous to life and health at 150 ppm [50]. For methyl mercaptan, the 10-minute acute exposure guideline level (AEGL)-2 (disabling) is 40 ppm and the 10-minute AEGL-3 (lethal) is 120 ppm. According to the National Center for Biotechnology Information, “AEGL-2 is the airborne concentration (expressed as ppm or mg/m3) of a substance above which it is predicted that the general population, including susceptible individuals, could experience irreversible or other serious, long-lasting adverse health effects or an impaired ability to escape. AEGL-3 is the airborne concentration (expressed as ppm or mg/m3) of a substance above which it is predicted that the general population, including susceptible individuals, could experience life-threatening health effects or death” [130]. d Methyl mercaptan is flammable at concentrations between 3.9 percent and 21.8 percent in air [50]. e The sequence of events is also presented in   Appendix B: Incident Timeline. f The chemical involved in this dilution was acetaldehyde oxime (AAO). Additional information about the AAO dilution portion of the incident is in the CSB DuPont La Porte Interim Recommendations [1, pp. 20-21]. g At low temperatures (≤ 52 degrees Fahrenheit (°F)), water and methyl mercaptan form a solid, ice-like material called methyl mercaptan clathrate hydrate [72]. Temperatures in the Houston area for the 24 hours preceding the incident averaged approximately 40°F and had been consistently below 55°F since Tuesday, November 11, 2014. Although the potential for methyl mercaptan hydrate formation had been identified in DuPont’s methyl mercaptan technical standard and in process hazard analyses years earlier, DuPont never implemented safeguards, such as heat tracing, or developed a procedure to dissociate the hydrate safely [1, p. 22].

  Page  14  

La  Porte,  Texas  |  Incident  Date:  November  15,  2014  |  No.  2015-­01-­I-­TX   U.S.  Chemical  Safety  and   Hazard  Investigation  Board   Toxic  Chemical  Release  at  the   DuPont  La  Porte  Chemical  Facility   know the source of the plugging and began troubleshooting the process to try to clear the piping, unaware that the solid hydrate had formed. Two days later, on Friday, November 14, 2014, the troubleshooting efforts to clear the plugging were still ongoing. That morning, the Lannate® Unit Technical Team (Technical Team), composed of engineers and other employees experienced in the process, met with operations personnel to discuss troubleshooting options to clear the plugging. This meeting identified the likely scenario that water had entered the methyl mercaptan system, forming a solid hydrate. DuPont’s methyl mercaptan technical standard identifies the potential to form a hydrate at low temperatures. The technical standard states that methyl mercaptan “will form a hydrate with water, which is a solid below 40 deg F [degrees Fahrenheit] per information provided by a [methyl mercaptan] supplier.” Based on this understanding, the Technical Team asked that operators put hot water on the outside of the methyl mercaptan piping, under the insulation, to warm the piping and its contents to break up (dissociatea) the plugging. The Technical Team also realized that when heated, methyl mercaptan would expand, requiring a safe place to vent to avoid over-pressuring the piping. To address this concern, operations personnel opened valves between the methyl mercaptan piping and a waste gas vent header (vent header), not recognizing that this alignment created a pathway for liquid methyl mercaptan to eventually release from the piping inside the manufacturing building when drain valves were opened. In addition, when operations personnel opened other valves while troubleshooting, such as drain valves, methyl mercaptan was released to the atmosphere, causing a strong methyl mercaptan odorb that could be smelled by site personnel. During troubleshooting, methyl mercaptan was released both outside and inside the manufacturing building, triggering 32 methyl mercaptan gas alarmsc on the control panel throughout the 17 hours preceding the incident. Although methyl mercaptan is a toxic and flammable chemical, and at high enough concentrations lethal, some operations personnel did not respond in accordance with the nature of the emergency circumstances because they associated the alarms with the ongoing troubleshooting efforts. They did not perceive the methyl mercaptan alarms as signifying a serious hazard because they had normalizedd the methyl mercaptan odor within the Lannate® Unit, as well as the detector alarms. Early in the morning on Saturday, November 15, 2014, the hot water from the hoses warmed the hydrate plugging, causing it to dissociate, clearing the plugging. Due to the valve alignment, liquid methyl mercaptan

a Methyl mercaptan clathrate hydrate dissociates back to the liquid phases of methyl mercaptan and water at approximately 52°F [72]. b Methyl mercaptan has a low odor threshold. It gives off a smell like rotten cabbage. It can be smelled at only two parts per billion (ppb) [80, p. 1]. OSHA’s permissible exposure limit (PEL), however, is 10 parts per million (ppm), which is 5,000 times the minimum concentration that can be smelled. The low odor threshold of mercaptans makes them useful as fuel gas odorants [80, p. 2]. c DuPont used hydrogen sulfide (H2S) detectors to identify methyl mercaptan. The alarms activated when the detectors sensed the hydrogen sulfide equivalent of 25 ppm methyl mercaptan. Twenty-five ppm is the ERPG-2 level for methyl mercaptan (see Section 4.8) [82, p. 27]. This level “is the maximum airborne concentration below which nearly all individuals could be exposed for up to 1 hour without experiencing or developing irreversible or other serious health effects or symptoms which could impair an individual’s ability to take protective action.” Emergency responders use ERPG-1, -2, and -3 concentration data to determine how to protect the public [167]. DuPont records indicate that the device manufacturer stated the detector should be capable of detecting methyl mercaptan within 1 ppm [1, p. 37]. d Normalization of deviance is a phenomenon in which individuals or work teams gradually accept a lower standard of performance until the lower standard becomes the norm. It is typically the result of slowly changing and eroding conditions over time [79, p. 4].

  Page  15    

La  Porte,  Texas  |  Incident  Date:  November  15,  2014  |  No.  2015-­01-­I-­TX   U.S.  Chemical  Safety  and   Hazard  Investigation  Board   Toxic  Chemical  Release  at  the   DuPont  La  Porte  Chemical  Facility   flowed into the waste gas vent header, located inside the manufacturing building [1, pp. 25-26]. The vent header, however, was not intended nor designed for liquid methyl mercaptan. At 2:51 am, alarms began to sound on the control system indicating high pressure in equipment inside the manufacturing building. Operations personnel did not realize that liquid methyl mercaptan was causing the high pressure. Instead, they attributed the high pressure to a common, long-standing problem with process condensate, which DuPont La Porte personnel believed to be mostly water, accumulating in the vent header piping [1, p. 28]. The Lannate® control room board operator (Board Operator) contacted the night shift supervisor (Shift Supervisor) and another operator (Operator 1) separately, asking them to help troubleshoot the high-pressure situation. Manually draining the vent header inside the manufacturing building, a long-standing practice, was the typical approach used to remove process condensate from the vent header, as it successfully reduced system pressure many times in the past.a The Shift Supervisor and Operator 1 each went separately to the manufacturing building, likely in order to drain liquid from the vent header piping manually. Sometime between 3:01 am and 3:13 am, a worker (likely the Shift Supervisor)b manually opened two sets of drain valves on the vent header piping, located on the third floor of the manufacturing building (Figure 2). But instead of the expected condensate composed mostly of water, the liquid methyl mercaptan that had filled the piping escaped out of the valves, vaporized, and killed the Shift Supervisor. Between 3:24 am and 3:26 am, three methyl mercaptan detectors inside the manufacturing building sensed at least 25 parts per million (ppm)c of methyl mercaptand and triggered alarms at the control panel (Figure 3). The Board Operator—still focused on reducing the high pressure—did not realize a major chemical release was occurring inside the manufacturing building (Section 3).

a In 2011, DuPont installed a NOx (nitrogen oxides) reduced scrubbed (NRS) incinerator system. The waste gas vent header piping to the NRS incinerator was designed without sufficient consideration of liquid accumulation. It contained low points where liquid could accumulate, and there was no engineered equipment provided, such as a knock-out drum, to remove liquid safely from the waste gas vent header piping system. The liquid accumulation in the piping would create pressure in process equipment. Pressure buildup within the equipment was resolved by manually draining liquid from the waste gas vent header. See Section 6, Process Safety Management Deficiencies, and DuPont La Porte, Texas Chemical Facility Toxic Chemical Release: Interim Recommendations [1, p. 18]. b The Shift Supervisor was most likely the worker who opened the valves, based on both the location in the manufacturing building where he was recovered and information learned in interviews that suggested he was the worker most likely to have opened those specific valves to drain the vent header piping. c The methyl mercaptan detectors were evaluated post-incident. Although the detectors inside the building have the ability to span 0–50 ppm, these detectors were set to span 0–25 ppm. Post-incident, the span was increased to 50 ppm. Additionally, information from the methyl mercaptan detectors inside the manufacturing building displayed only on the distributed control system (DCS) monitor and was not recorded by the site’s DCS and data historian [1, p. 37]. CSB investigators, however, were able to obtain information about the alarms associated with the detectors from alarm logs. d The methyl mercaptan detectors alarm at 25 ppm—well above the NIOSH recommended exposure limit (REL) of 0.5 ppm and the OSHA enforceable PEL ceiling limit of 10 ppm. OSHA recommends that employers consider using the lower alternative occupational exposure limits because the agency believes that exposures above some of these alternative occupational exposure limits may be hazardous to workers, even when the exposure levels comply with the relevant PELs [149]. The Cal-OSHA permissible exposure limit (PEL) is an 8-hour time-weighted average (TWA) of 0.5 ppm, and the NIOSH REL is a 15-minute ceiling limit of 0.5 ppm [159], [50].

  Page  16  

La  Porte,  Texas  |  Incident  Date:  November  15,  2014  |  No.  2015-­01-­I-­TX   U.S.  Chemical  Safety  and   Hazard  Investigation  Board   Toxic  Chemical  Release  at  the   DuPont  La  Porte  Chemical  Facility   Figure  2.    Waste  Gas  Vent  Header  Piping  on  the  Third  Floor  of  the  Manufacturing  Building.    This  portion,  where  several  waste  gas   sources  come  together,  is  referred  to  as  the  waste  gas  vent  header.    Waste  gas  from  this  portion  of  the  vent  header  traveled  up  to   reach  the  NRS  incinerator,  a  piping  configuration  that  created  a  low  spot  where  liquid  accumulated.    To  remove  the  liquid  during  waste   gas  vent  header  piping  high-­‐pressure  events,  operators  were  instructed  to  open  valves  (yellow  circle)  and  drain  the  system  through  a   hose  routed  to  a  floor  drain  located  near  a  safety  shower.    The  floor  drain  is  connected  an  open  trench-­‐type  sump  on  the  first  floor.    At   the  time  of  the  incident,  a  second  set  of  drain  valves  (red  circle)  were  also  opened  directly  to  the  floor  inside  the  manufacturing   building.    Source:  CSB.  

  Page  17    

La  Porte,  Texas  |  Incident  Date:  November  15,  2014  |  No.  2015-­01-­I-­TX   U.S.  Chemical  Safety  and   Hazard  Investigation  Board   Toxic  Chemical  Release  at  the   DuPont  La  Porte  Chemical  Facility  

Figure  3.    Depiction  Showing  Where  Drain  Valves  Were  Opened.    These  drain  valves  released  toxic  methyl  mercaptan  into  the   manufacturing  building.    Methyl  mercaptan  detectors  on  the  first  and  fourth  floors  detected  high  concentrations  of  methyl   mercaptan  shortly  after  the  release  began.    This  depiction  is  a  simplified  graphic  of  the  manufacturing  building  (see  Section  4.5)  and   does  not  show  the  location  of  Operator  1.    Source:  CSB.   At about 3:30 am, Operator 1 made an urgent call for help over the radio. Various personnel interpreted her communication in different ways, generally as either “We need help!” or “I need help on the fourth floor!” The Board Operator tried to get more information through radio communication, but neither the Shift Supervisor nor Operator 1 ever responded [1, p. 29]. Two operators (Operator 2 and Operator 3) who were in the control room and heard the distress call ran to the manufacturing building to help. Another operator (Operator 4) saw Operator 2 and Operator 3 running to the manufacturing building, and he followed them. None of these operators knew of the major release of toxic methyl mercaptan inside of the manufacturing building; therefore, they did not wear any respiratory protection when they ran into the manufacturing building. The manufacturing building lacked automatic visual or audible

  Page  18  

La  Porte,  Texas  |  Incident  Date:  November  15,  2014  |  No.  2015-­01-­I-­TX   U.S.  Chemical  Safety  and   Hazard  Investigation  Board   Toxic  Chemical  Release  at  the   DuPont  La  Porte  Chemical  Facility   alarms to alert fieldworkers or prevent them from entering a potentially toxic atmosphere (Section 3). In addition, the building’s ventilation fans were not working, a situation that, in DuPont’s operating procedures, required “restricted access” to the building. But DuPont La Porte’s procedures did not define “restricted access” or require that operators wear respiratory protection in the building when access was restricted, even though a toxic chemical release could accumulate in the unventilated building [1, p. 29]. Operator 2, Operator 3, and Operator 4 each entered the south stairway and took different a route inside the manufacturing building to try to find Operator 1 (Figure 4). Operator 2 went to the third floor, where he was fatally overcome by methyl mercaptan [1, p. 29]. Operator 4 went to the second floor. He walked about 10 feet and hit what he later described as a “wall” of methyl mercaptan, but he managed to retreat to the stairwell [1, p. 29]. Operator 3 went to the fourth floor but did not find anyone. He then announced on the Lannate® Unit’s public-address system that he did not see anyone on the fourth floor. The Board Operator responded that the Shift Supervisor and Operator 1 may be on the third floor [1, p. 29]. Operator 3 then began to feel light-headed. He made his way to the stairwell and lost consciousness while descending from the fourth floor [1, p. 29].

  Page  19    

La  Porte,  Texas  |  Incident  Date:  November  15,  2014  |  No.  2015-­01-­I-­TX   U.S.  Chemical  Safety  and   Hazard  Investigation  Board   Toxic  Chemical  Release  at  the   DuPont  La  Porte  Chemical  Facility   The Board Operator then tried to reach the Shift Supervisor, Operator 1, and Operator 2 over the radio, but they did not respond. An operator in the control room, Operator 6a (the brother of Operator 2), then grabbed three 5- minute escape respirators. Other operators in the control room warned him not to enter the manufacturing building because they did not know what was going on or where the nonresponsive operators were. Operator 6, however, took the escape respirators and rushed to the manufacturing building [1, p. 29]. At about 3:40 am, Operator 6 encountered Operator 4 in the south stairway of the manufacturing building and put an escape respirator on him (Figure 5). The breathing air helped Operator 4 recover, and he exited the manufacturing building safely. A worker—likely Operator 6—then manually activated the manufacturing building fume release alarm, an alarm intended to alert area workers of a toxic chemical release in the building. Operator 6 then went to the third floor of the manufacturing building. At some point after helping Operator 4,

a Operator 6 was a board operator for another process in the Lannate® Unit. Figure  4.    Depiction  of  Paths  Taken  by  Operator  2,  Operator  3,  and  Operator  4  When  Whey  Responded  to  Operator  1’s  Distress  Call.    Locations  of  the  deceased  Shift  Supervisor  and  Operator  1  are  also  shown.    Operator  2  was  killed  by  methyl  mercaptan  exposure,   and  Operator  3  and  Operator  4  were  exposed  to  high  concentrations  of  methyl  mercaptan.    This  figure  shows  the  opposite  side  of   the  manufacturing  building  from  the  view  in  Figure  3.    Source:  CSB.

  Page  20  

La  Porte,  Texas  |  Incident  Date:  November  15,  2014  |  No.  2015-­01-­I-­TX   U.S.  Chemical  Safety  and   Hazard  Investigation  Board   Toxic  Chemical  Release  at  the   DuPont  La  Porte  Chemical  Facility   Operator 6 retrieved a self-contained breathing apparatus (SCBA) from inside the manufacturing building. He tried to rescue his brother (Operator 2) by putting one of the escape respirators on his face. Operator 6 was then fatally overcome by methyl mercaptan before he could connect his own respirator mask to his SCBA tank.

  EMERGENCY  RESPONSE   At about 3:50 am, the Board Operator called for the plant emergency response team (ERT)a to respond to the manufacturing building, stating over the intercom system, “We need rescue people, and there’s people missing.” This announcement started a chain of miscommunication. To the ERT, a request for “rescue” meant specifically

a At the time of the incident, three companies (DuPont, Kuraray, and Invista) operated at the La Porte site and shared one ERT for the site, which had members from each company and was managed by DuPont. The ERT members worked other, primary jobs for one of the three companies (such as unit operators), and they responded as ERT members during emergencies. The site’s ERT staffing included about 60 employees. Section 4.1 discusses the composition of the ERT in more detail.

Figure  5.    Depiction  of  the  Path  Taken  by  Operator  6  Inside  the  Manufacturing  Building.    Operator  6  helped  Operator  4  escape  by   providing  him  with  a  respirator.    Operator  6  was  fatally  overcome  by  methyl  mercaptan  when  trying  to  rescue  his  brother,   Operator  2,  on  the  third  floor.    Source:  CSB.

  Page  21    

La  Porte,  Texas  |  Incident  Date:  November  15,  2014  |  No.  2015-­01-­I-­TX   U.S.  Chemical  Safety  and   Hazard  Investigation  Board   Toxic  Chemical  Release  at  the   DuPont  La  Porte  Chemical  Facility   high-anglea or confined-space rescue. Therefore, the ERT responded to the request for help by gathering only technical rescue gear (e.g., harnesses and ropes), not knowing that there was a major toxic chemical release (Section 4.3.1) [1, p. 30]. At 3:57 am, the Board Operator called the security guard at the main entrance to ask the guard to call 9-1-1. The Board Operator communicated only that workers were missing and requested rescue. The guard, in turn, gave limited information to the 9-1-1 operator: 9-1-1 Operator: Harris County 911. What is the location of your emergency? Caller: This is DuPont on Strang Road…. They had an emergency out here. They got four people missing.… I was just called by the Lannate® supervisor [Board Operator] that he has four people missing. 9-1-1 Operator: So, are they somewhere there, or you don’t know where they’re at? Caller: I don’t know, ma’am. I am up in the front. I just got the phone call. 9-1-1 Operator: Okay, you don’t know their names or anything? Caller: No ma’am, just they needed rescue. 9-1-1 Operator: They need rescue? Caller: Yes ma’am. 9-1-1 Operator: And you don’t know their names, no descriptions, nothing? Caller: No ma’am. I just know that they’re workers. At 3:58 am, site emergency responders from the ERT arrived at the scene with only their technical rescue gear. They quickly realized that there was an ongoing chemical release and that they needed additional personal protective equipment (PPE). At 4:05 am, the Incident Commander, who had responded to the initial rescue request, called for the ERT to come to the scene with bunker gearb and SCBAs—the PPE necessary to enter an area with a toxic and flammable chemical release. When ERT members attempted to start the mini-pumper truck that contained SCBAs and radios, however, it would not start and could not make it to the incident scene (Section 4.3.2).c

a A high-angle rescue uses a variety of technical rope rescue techniques to retrieve injured or otherwise incapacitated persons on terrain at slopes of 60º or greater. Victims are hoisted from one level to another using ropes, pulleys, harnesses, belay devices, and various hauling implements [120]. b “Bunker gear” is a common term for firefighting protective clothing [96]. c The mini-pumper truck was located more than 2,000 feet from the control room.

  Page  22  

La  Porte,  Texas  |  Incident  Date:  November  15,  2014  |  No.  2015-­01-­I-­TX   U.S.  Chemical  Safety  and   Hazard  Investigation  Board   Toxic  Chemical  Release  at  the   DuPont  La  Porte  Chemical  Facility   The Incident Commander also requested safety data sheets for chemicals processed inside the manufacturing building, including methyl mercaptan. The ERT, however, did not initially use air monitoring equipment to determine what chemical was leaking. According to DuPont La Porte’s Lannate® emergency response plan,a area personnel control air monitoring equipment for their unit. Because the Shift Supervisor (Process Coordinator) who oversaw process operations was a victim of the incident and was not available to fulfill the assigned role of providing chemical hazard and unit-specific information about each of the processes to the ERT during an emergency, air monitoring was delayed during the early hours of the incident. Meanwhile, site personnel recognized the release by odor and believed that methyl mercaptan was the chemical leaking inside the building.b At around 4:10 am, the Incident Commander established a hot zone around the manufacturing building. The hot zone’s boundaries, however, were not clearly communicated or marked by the ERT (Section 4.7). At 4:12 am, an emergency operations center coordinator made a second 9-1-1 call, but he had not yet been informed by ERT personnel what chemical was leaking, or whether the leak posed a public threat, and was therefore unable to relay this critical information to the 9-1-1 operator: 9-1-1 Operator: Harris County 911. What is the location of your emergency? Caller: This is in La Porte, Texas.… We have an emergency at the DuPont Plant in La Porte.… We have a possible casualty five, is what my medics are telling me. We have some injuries. We need La Porte EMS for transportation.… 9-1-1 Operator: Okay, sir. How did this happen? Is it chemical-related? Caller: I am not certain. I just know … they’re doing a rescue—they’re doing a rescue right now. We have some injured people. I’m not sure if there’s any chemicals involved or not. I am just relaying the message. … Caller: I have just got some more information. We have five people unaccounted for. We have had a chemical release … I am not sure what chemical, in one of our buildings. Five people are unaccounted for. Rescue team is trying to reach them at this point. That’s all the information I can give you right now. …

a The Lannate® Unit emergency planning and response manual was developed to comply with the OSHA Process Safety Management of Highly Hazardous Chemicals standard, 29 C.F.R. § 1910.119(n) (2013). Under this standard, facilities are required to develop an emergency action plan and potentially an emergency response plan (29 C.F.R. § 1910.38 (2002); 29 C.F.R. §§ 1910.120 (a), (p), and (q) (2013)). An emergency response plan under the Hazardous Waste Operations and Emergency Response (HAZWOPER) standard is required if an internal emergency response team is responding to or has substantial threat of responding to releases of hazardous substances (29 C.F.R. §§ 1910.120 (a)(2)(iv) and (q)(1) (2013)). Because the La Porte site had an internal emergency response team that responded to releases of hazardous substances, HAZWOPER required that the site have an emergency response plan. b Using smell to locate or characterize sources of a release is a poor practice. Chemicals have different physical properties, including olfactory fatigue, no odor, and toxicity if inhaled.

  Page  23    

La  Porte,  Texas  |  Incident  Date:  November  15,  2014  |  No.  2015-­01-­I-­TX   U.S.  Chemical  Safety  and   Hazard  Investigation  Board   Toxic  Chemical  Release  at  the   DuPont  La  Porte  Chemical  Facility   9-1-1 Operator: Okay sir. And can you tell me, is this any risk to the public? Is it going to be a possible escaping from your premises? Caller: No ma’am, it is not. 9-1-1 Operator: No threat? Caller: No ma’am. … 9-1-1 Operator: And we don’t know what kind of chemical it is? Caller: No ma’am. As soon as I find out, I will let you know. I’ve got my team trying to determine that right now. At about 4:15 am, ERT members assigned an operator (Operator 7) to bring them SCBAs because the ERT mini-pumper truck holding SCBAs could not respond to the scene. DuPont stored additional SCBAs outside a building closer to the manufacturing building. Assisting the ERT as requested, Operator 7 went alone to retrieve these SCBAs and unknowingly walked into the path of the methyl mercaptan being released from the manufacturing building (Figure 6).a The hot zone was not clearly identified or communicated to plant personnel. As a result, when Operator 7 went to retrieve the SCBAs, she was unaware that she was entering a potentially hazardous area. When Operator 7 went outside, though unable to smell methyl mercaptan, she felt ill.b Realizing that she might be in a dangerous position, she retreated to the control roomc (Section 4.7). At about 4:20 am, Operator 3 regained consciousness and managed to exit the manufacturing building [1, p. 29].

a At 3:50 am, at Ellington Field, Texas (about 10.5 miles southwest of the DuPont La Porte facility), the wind was blowing from the northeast at 8.1 miles per hour (mph) [100]. b These symptoms are consistent with methyl mercaptan exposure. Olfactory fatigue is known to occur with exposure to methyl mercaptan, resulting in the exposed person not being able to detect the chemical by smell. Inhaling methyl mercaptan can also induce headaches, dizziness, nausea, vomiting, coma, and death [80]. c Operator 7 believes she was exposed to a high concentration of methyl mercaptan, but she was able to return to safety. Figure  6.    Depiction  of  Path  Taken  by  Operator  7  to  Retrieve   SCBAs  for  ERT  When  the  Mini  Pumper  Truck  Would  Not  Start.     The  hot  zone  was  not  controlled  adequately  to  ensure  that   personnel  did  not  enter  a  hazardous  area.    Source:  Google   Earth,  with  annotations  by  CSB.

  Page  24  

La  Porte,  Texas  |  Incident  Date:  November  15,  2014  |  No.  2015-­01-­I-­TX   U.S.  Chemical  Safety  and   Hazard  Investigation  Board   Toxic  Chemical  Release  at  the   DuPont  La  Porte  Chemical  Facility   ERT members saw him near the manufacturing building and escorted him to safety. Beginning at about 4:25 am, the first ERT entry team entered the manufacturing building. Although the ERT used breathing air (SCBAs) to protect themselves from toxic exposure, they did not monitor the atmosphere during this building entry to assess explosive hazards. Portions of the building likely had an explosive atmosphere during the incident (Section 4.4.1), and air monitoring could have alerted personnel to this potential hazard during this entry. The ERT’s post-incident critique stated “metering and [air] monitoring equipment were maintained by the unit. Since the technical knowledge basea was incapacitated, there was a delay in establishing [air] monitoring.” During the building entry, an ERT member found drain valvesb from the waste gas vent header on the third floor open, with a gas (later identified as methyl mercaptan) flowing from them. The ERT members also found the Shift Supervisor on the floor of the third story, about 30 feet north of the drain valves. They also found Operator 6 next to his brother (Operator 2), and both men were unresponsive. Operator 2 had a 5-minute escape respirator bag over his head. This respirator was one of the three escape packs brought into the building by Operator 6. Operator 6 had a 30-minute SCBA air bottle in front of him and the mask on his face, but he had not connected the mask to the air bottle. Methyl mercaptan likely incapacitated Operator 6 while he was trying to don his SCBA [1, p. 31]. A postmortem examination determined that the Shift Supervisor, Operator 2, and Operator 6 were killed by asphyxia through exposure to methyl mercaptan. During the release, the ERT used a plume dispersion model to predict the methyl mercaptan plume (cloud) size and concentration profile releasing from the manufacturing building. To predict the methyl mercaptan plume effectively, the modeling software required an estimate of the methyl mercaptan release rate. The emergency response personnel, however, did not have an available method to estimate the methyl mercaptan release rate. Lacking other data sources and based on the perceived low odor of methyl mercaptan outside the manufacturing building, they estimated a release rate of 10 pounds per hour. With this input, the model predicted that methyl mercaptan would not leave DuPont property at concentrations harmful to the public. The CSB determined, however, that the emergency response personnel greatly underestimated the release rate. It was not possible for the CSB to determine the exact off-site methyl mercaptan concentration immediately after the release; however, the CSB concluded that the total release of about 24,000 pounds of methyl mercaptan created the potential for a dangerous concentration of methyl mercaptan to have been released off-site (Section 4.8.1). Beginning at 5:08 am, three external firefighter groups arrived on-site, and at 5:15 am the ERT conducted its second entry into the manufacturing building. On the third floor, an ERT responder closed the open drain valves from which he had observed vapor (methyl mercaptan) escaping.

a The Shift Supervisor who served as the Process Coordinator—that is, the technical liaison—was killed by the release. b These drain valves were not closed at this time.

  Page  25    

La  Porte,  Texas  |  Incident  Date:  November  15,  2014  |  No.  2015-­01-­I-­TX   U.S.  Chemical  Safety  and   Hazard  Investigation  Board   Toxic  Chemical  Release  at  the   DuPont  La  Porte  Chemical  Facility   At about 5:40 am, emergency responders established and barricaded the hot zone. Until this point, the hot zone had not been marked clearly. At 5:57 am, the Incident Commander requested Harris County personnel to perform air monitoring off-site. At 6:02 am, approximately three hours after the release started, DuPont La Porte personnel turned off the methyl mercaptan storage tank pump, which had been operating since the last startup attempt, before the release began (Figure 7). Shutting off this pump significantly slowed the methyl mercaptan release rate (Section 4.6).a

Figure  7.    Location  of  Methyl  Mercaptan  Pump.    The  pump  was  turned  off  nearly  three  hours  after  the  release  began.    Source:   Google  Earth,  with  annotations  by  CSB.   From 6:10 am to 9:30 am, the ERT conducted the third, fourth, and fifth ERT building entries to search for Operator 1, who was still missing. Due to the complex layout and emergency responders’ lack of knowledge of the manufacturing building, the emergency responders had difficulty finding Operator 1. They had no maps to reference during their search, and DuPont La Porte did not have cameras in the manufacturing building to

a The design of the nitrogen relief valves at the railcar loading and unloading stations did not consider a scenario in which the relief valves could be lined up with the discharge of the methyl mercaptan pumps, as they were at the time of the incident. The methyl mercaptan pump discharge pressure (90 pounds per square inch gauge (psig)) was higher than the set pressure (80 psig) of these nitrogen relief valves. Therefore, the methyl mercaptan pump would cause the relief valve to open and release the highly toxic and highly flammable chemical to the atmosphere. When tested post-incident, three of the four nitrogen rupture discs burst, and all four of the nitrogen relief valves leaked. Because the rupture discs and relief valves would not hold pressure when tested, an atmospheric release of highly toxic and highly flammable liquid methyl mercaptan likely occurred during the incident through this relief system that was intended to release and disburse nitrogen vapor [1, p. 46]. A rupture disc is a non-reclosing pressure relief device, a type of emergency relief device. According to the Center for Chemical Process Safety (CCPS), an emergency relief device is designed to open during an emergency or during abnormal conditions to prevent rise of internal fluid pressure in excess of a specified value. The device also may be designed to prevent excessive internal vacuum [110]. For more information on pressure relief devices, see “An Overview of Pressure Relief Devices” [111, pp. 20-27].

  Page  26  

La  Porte,  Texas  |  Incident  Date:  November  15,  2014  |  No.  2015-­01-­I-­TX   U.S.  Chemical  Safety  and   Hazard  Investigation  Board   Toxic  Chemical  Release  at  the   DuPont  La  Porte  Chemical  Facility   provide a view of the different floors of the building (Section 4.5). To facilitate the search efforts, the ERT assigned area operators—including the Board Operator—to draw building maps to help emergency responders navigate the manufacturing building. During this time, ERT responders continued closing valves throughout the Lannate® Unit to stop the release of methyl mercaptan. At 6:14 am, a Harris County Sheriff’s sergeant noticed an “intense smell” in Deer Park (west of La Porte), and at 6:30 am, he communicated, “the odor on [Highway] 225 [is] strong” (Figure 8). At 8:07 am, Harris County’s Hazardous Materials Team performed off-site air monitoring to measure the concentration of toxic methyl mercaptan outside of the DuPont fence line. Harris County’s instrumentation did not detect methyl mercaptan in the air (Section 4.8.4). At 10:07 am—seven hours after the release began—DuPont activated the methyl mercaptan tank emergency isolation valve to isolate the methyl mercaptan storage tank completely from the leaking process piping (Section 4.6). Between 11:15 am and 11:55 am, during the sixth ERT entry into the manufacturing building, Operator 1 was found unresponsive in the north stairwell of the manufacturing building. The coroner later determined that Operator 1 had died from asphyxia and acute exposure to methyl mercaptan.

Figure  8.    Locations  Where  a  Sheriff’s  Sergeant  Reported  Strong  Methyl  Mercaptan  Odor  During  the  Incident.    Source:  Google  Earth,  with   annotations  by  CSB.  

  Page  27    

La  Porte,  Texas  |  Incident  Date:  November  15,  2014  |  No.  2015-­01-­I-­TX   U.S.  Chemical  Safety  and   Hazard  Investigation  Board   Toxic  Chemical  Release  at  the   DuPont  La  Porte  Chemical  Facility   3   DELAYED  AWARENESS  OF  TOXIC  CHEMICAL  RELEASE  BY  OPERATIONS   Highly toxic methyl mercaptan was released into the manufacturing building for about 40 minutes before operations personnel in the control room realized the extent of the emergency in the building, and for more than six additional hours before the release was fully controlled. The CSB identified factors that led to this delay in recognizing a major chemical release, including:

  1.   The Board Operator was focused on process equipment high-pressure events that he believed

were critical. Operations personnel became aware of the high-pressure events when insecticide manufacturing equipment venting into the waste gas vent header began to exhibit high-pressure alarms. At this point, operations personnel shifted their attention from the problem of plugging in the methyl mercaptan feed system to the current problem of high pressure in the waste gas vent header piping to the NRS incinerator. DuPont La Porte operations staff did not correlate the high- pressure problem with the troubleshooting efforts to unplug the methyl mercaptan feed piping through hydrate dissociation. Rather, they attributed the high-pressure events to the routine problem of liquid accumulation in the waste gas vent header piping. The Board Operator directed personnel to help troubleshoot the high-pressure problem [1, p. 28]. The operating pressure of various pieces of process equipment inside the manufacturing building, however, continued to increase, in some equipment exceeding the high-scale detection limits of process instrumentation. The Board Operator was concerned about the potential for equipment overpressure and the release of toxic chemicals to the atmosphere outside the manufacturing building. Even though methyl mercaptan detectors were beginning to alarm, the Board Operator either was unaware of them or had normalized them, not realizing the alarms were alerting him that a significant release had started to occur inside the building. Unaware that a significant methyl mercaptan release had begun, the Board Operator remained focused on controlling the high pressure he was observing inside the equipment.a

  1.   Lannate® Unit personnel accepted methyl mercaptan releases and the associated alarms as

normal because of methyl mercaptan’s low odor threshold,b a history of frequent alarms, and a lack of hazard recognition that methyl mercaptan could be lethal. Methyl mercaptan is a highly toxic chemical, but its odor can be detected at very low concentrations that are not

a Although the Board Operator acknowledged the methyl mercaptan alarms on the control system during the incident, afterwards he did not recall that any methyl mercaptan detectors inside the manufacturing build had alarmed. b Odor threshold, in general, is the lowest concentration of a gas or other material’s vapor that can be detected by odor. Odor threshold values are not fixed physiological parameters or physical constants but instead statistical points representing the best estimated value from a group of individual responses [112, p. 2]. The odor threshold for methyl mercaptan is approximately two parts per billion (2 ppb). However, olfactory fatigue is known to occur with methyl mercaptan, causing the exposed person no longer to be able to detect the chemical by smell. As a result, odor may not provide adequate warning of hazardous concentrations [80, p. 1].

  Page  28  

La  Porte,  Texas  |  Incident  Date:  November  15,  2014  |  No.  2015-­01-­I-­TX   U.S.  Chemical  Safety  and   Hazard  Investigation  Board   Toxic  Chemical  Release  at  the   DuPont  La  Porte  Chemical  Facility   considered a health risk to people.a Additionally, the Lannate® Unit used methyl isocyanate (MIC)b and chlorine,c which are generally accepted as being more hazardous (toxic) than methyl mercaptan.d As a result, even though Lannate® Unit personnel were trained on methyl mercaptan toxicity hazards,e personnel at the site became accustomed to smelling methyl mercaptan daily without experiencing negative health effects, leading workers to become less wary of methyl mercaptan leaks and the risks associated with them. According to one DuPont worker, there was a perception that methyl mercaptan (which workers called “MeSH”) was not dangerous: And I smell MeSH all the time … but it never … I smelled MeSH, but I never felt I couldn’t breathe. Like whether it’s, there’s—whether it’s a small leak or anything, it just never—I didn’t think MeSH was that dangerous. I thought it, you know, but it is. During the troubleshooting efforts before the major release began, smaller releases of methyl mercaptan had caused the site to have a strong odor of methyl mercaptan. Therefore, when the major release began, site personnel did not realize there was a major release, in part because they were accustomed to smelling the chemical.

  1.   Personnel were not wearing personal methyl mercaptan detectors. DuPont La Porte had some

personal methyl mercaptan detectors available, but they were never issued to operators to wear in the field. Such detectors could have warned Operator 2, Operator 3, and Operator 4 (personnel who initially responded to Operator 1’s distress call) of the high methyl mercaptan concentration inside the manufacturing building.

a Methyl mercaptan gives off a smell like rotten cabbage. It can be smelled at only 2 parts per billion [80, p. 1]. OSHA’s permissible exposure limit, however, is 10 parts per million, which is 5,000 times the minimum concentration that can be smelled. The low odor threshold of mercaptans makes them useful as fuel gas odorants [80, p. 2]. b MIC is a raw material used in the production of insecticides at La Porte, including the Lannate® process. The 1984 MIC release at the Union Carbide insecticide plant in Bhopal, India, that killed thousands of people is an example of the extremely toxic properties of MIC [148]. For more information, see Reflections on Bhopal after Thirty Years [148]. c DuPont’s corporate standard for the management of highly toxic materials identifies both methyl mercaptan and chlorine as highly toxic. DuPont considers a material to be highly toxic if it is handled, stored, or shipped in a sufficient quantity that a credible event could result in a concentration of Emergency Response Planning Guidelines (ERPG)–3, and if it has a Substance Hazards Index (SHI) greater than or equal to 4,000. This level “is the maximum airborne concentration below which nearly all individuals could be exposed for up to 1 hour without experiencing or developing life-threatening health effects.” Emergency responders use ERPG-1, -2, and -3 concentration data to determine how to protect the public [167]. DuPont determines the SHI using vapor pressure and ERPG-3 data for each chemical. Using this approach, DuPont derived an SHI of 19,855 for methyl mercaptan and 385,197 for chlorine. d Methyl mercaptan’s threshold quantity (5,000 pounds) that presents the potential for a catastrophic event, under PSM, is larger than that of chlorine (1,500 pounds) or MIC (250 pounds), making it less hazardous than either of the other two chemicals (29 C.F.R. § 1910.119, Appendix A). e DuPont La Porte used computer-based training to communicate hazards about methyl mercaptan (i.e., to perform hazard communication, or HAZCOM), consisting of methyl mercaptan hazard information and a quiz. The information gives some of the toxic exposure limits for methyl mercaptan. Additionally, the training details that gross exposure can result in death, but it does not specify the value at which the chemical is immediately dangerous to life and health. The training advises workers to use at a minimum an SCBA when responding to a methyl mercaptan alarm, and not to use smell to detect leaks because methyl mercaptan can cause olfactory fatigue, causing anyone exposed to it to stop perceiving an odor within minutes. If there is a leak, personal protective equipment (PPE) is supposed to be upgraded. Upgraded PPE also applies to line breaking, and it includes a chemical suit with taped sleeves and cuffs, chemical hood, chemical boots, chemical gloves, and an SCBA.

  Page  29    

La  Porte,  Texas  |  Incident  Date:  November  15,  2014  |  No.  2015-­01-­I-­TX   U.S.  Chemical  Safety  and   Hazard  Investigation  Board   Toxic  Chemical  Release  at  the   DuPont  La  Porte  Chemical  Facility  

  1.   DuPont La Porte did not have audible or visual alarms on or in the manufacturing building to

alert field personnel of a methyl mercaptan release automatically. DuPont La Porte relied on verbal communication of alarms, which automatically displayed on a continuously manned control board. The delay in recognizing this event as a major toxic chemical release that was becoming a deadly concentration of methyl mercaptan inside the building contributed to the response of Operator 2, Operator 3, and Operator 4 to Operator 1’s distress call without respiratory protection. According to DuPont La Porte’s Lannate® emergency planning and response manual, if a sensor detected a methyl mercaptan leak and initiated an alarm, personnel were required to notify a shift supervisor, sound a plantwide fume release alarm, and wear appropriate PPE (including SCBA) during any attempts to stop the leak. The manufacturing building, however, including the building’s overall construction, detectors, and alarms, was not designed such that personnel could be readily notified of a major chemical release in the manufacturing building. Without being made aware of the major chemical release inside the building, Operator 2, Operator 3, and Operator 4 entered without respiratory protection. As a result, Operator 2 was killed by methyl mercaptan exposure, and Operator 3 and Operator 4 were exposed to dangerous concentrations of methyl mercaptan. GUIDANCE  TO  INDUSTRY   It is crucial that workers understand when an emergency is occurring. OSHA’s Hazardous Waste Operations and Emergency Response (HAZWOPER) standard requires that an emergency response plan address emergency recognition and prevention.a For this standard to be effective, companies should ensure that their systems associated with emergency recognition and prevention, such as alarms and training, can inform workers of hazards and emergencies. For example, audible or visual alarms can automatically relay to personnel in the field information about a hazardous condition—such as a release of a toxic chemical. Systems like those implemented at DuPont, on the other hand, where alarms displayed only on an operator’s control board and still needed an operator to verbally communicate alarms, have inherent potential delays. The Center for Chemical Process Safety’s book Continuous Monitoring for Hazardous Material Releases provides guidance on the use of such alarms: There are occasions when process equipment must be located indoors due to weather-related or quality control issues. Combustible [and toxic] gas detection should be provided in these buildings…. This detection should be configured to: •   Send an alarm signal to a continuously manned location; •   Activate visible and audible alarm devices on the exterior of the building at each entranceway and within the structure. The devices within the structure should be

a 29 C.F.R. § 1910.120 (q)(2)(iii) (Feb. 8, 2013).

  Page  30  

La  Porte,  Texas  |  Incident  Date:  November  15,  2014  |  No.  2015-­01-­I-­TX   U.S.  Chemical  Safety  and   Hazard  Investigation  Board   Toxic  Chemical  Release  at  the   DuPont  La  Porte  Chemical  Facility   configured using the guidance for fire alarm devices, as provided in NFPA 72, National Fire Alarm and Signaling Code®; and •   Include a local means of silencing the alarms [6, pp. 63-64]. Training is another important way to address emergency recognition and prevention. Under OSHA’s Hazard Communication (HAZCOM) standard, companies are required to provide information to employees about the hazardous chemicals that they may be exposed to at work, including through training.a Companies should ensure that, in addition to having access to chemical information, employees understand the hazards of all chemicals they are working with and may be potentially exposed to if there is a release. In cases of multiple hazardous chemicals, such as MIC, chlorine, and methyl mercaptan, it is important that companies effectively train workers on the hazards of each chemical. This training is important for workers to help ensure they have a working knowledge of chemical hazards. Working knowledge of the hazards of all chemicals they are working with and may be potentially exposed to if a release occurs can improve employees’ recognition of emergency conditions and help them prevent major accidents in the manner that an emergency response plan intends.

4   EMERGENCY  RESPONSE  OPERATIONS   On the night of the incident, the Board Operator’s request for the emergency response team (ERT) to come to the scene triggered the start of emergency response operations. From this initial request for ERT aid to the final response activities, the La Porte site’s emergency response efforts were characterized by miscommunication, disorganization, and a lack of situational awareness. The following key emergency response weaknesses are discussed in this section: •   Based on DuPont La Porte’s emergency response plan, emergency response personnel relied on the expertise of the shift supervisor, who was the designated process coordinator. The Shift Supervisor, however, was a victim of the incident, and no one else on the shiftb was designated to backfill the role of process coordinator. This gap led to weaknesses in several aspects of the emergency response operations (Section 4.2), including the initial assessment of the problem and of the resources needed for an effective response. •   There was a delay in ERT deployment and readiness to respond to the release, due to both a misunderstanding of the type of emergency and the failure of an ERT mini-pumper truck that stored SCBAs to start (Section 4.3). •   Searching for the missing workers put the ERT responders at high risk. ERT responders entered a hazardous and potentially explosive atmosphere without performing air monitoring. Additionally—

a 29 C.F.R. § 1910.1200 (b)(1) (Feb. 8, 2013). b The Lannate® Unit’s emergency planning and response manual designated a primary and secondary backup for the process coordinator. These backups, however, were not on-site during the evenings and weekends, including when the incident occurred on November 15, 2014.

  Page  31    

La  Porte,  Texas  |  Incident  Date:  November  15,  2014  |  No.  2015-­01-­I-­TX   U.S.  Chemical  Safety  and   Hazard  Investigation  Board   Toxic  Chemical  Release  at  the   DuPont  La  Porte  Chemical  Facility   unbeknownst to them—they entered an area of the manufacturing building that DuPont La Porte had previously identified as a collapse risk in the event of an explosion (Section 4.4). •   DuPont La Porte’s emergency planning and response manual lacked a building map or floor plans to aid emergency responders in navigating the manufacturing building. As a result, the ERT experienced difficulties navigating the manufacturing building while searching for a missing operator; they resorted to assigning unit operators, including the Board Operator, to draw maps of the building to help guide them. This assignment diverted the Board Operator’s attention from other critical tasks, such as viewing process data on the control room computer screen to try to identify the source of the release (Section 4.5). •   The methyl mercaptan release was not controlled until three hours after it began. Personnel did not evaluate process data to determine the cause of the release until hours into the response efforts. Analysis of process data from the methyl mercaptan storage tank earlier during the release may have revealed that the methyl mercaptan storage tank level was continually dropping and that isolating the tank could stop the release (Section 4.6). •   Emergency responders established a hot zone that was not clearly marked or communicated, thereby allowing an operator to be potentially exposed to a dangerous concentration of methyl mercaptan when tasked to assist the ERT (Section 4.7). •   The ERT underestimated the quantity of toxic methyl mercaptan released. Because DuPont La Porte lacked fence-line monitors and the ERT did not conduct air monitoring to determine the concentration of methyl mercaptan leaving the site, the ERT did not have accurate values to use in its dispersion model. Instead, ERT members estimated a small quantity of methyl mercaptan based on verbal descriptions of the release’s downwind odor. As a result, the incident command did not issue warnings to the community surrounding the La Porte facility to take protective actions from the possibility of toxic concentration of methyl mercaptan exiting the site during the release. Furthermore, because air monitoring had not occurred during the release, neither DuPont La Porte nor the CSB can pinpoint the exact methyl mercaptan concentration that left the site, or what the potential health risk was to the public, if any (Section 4.8).   ERT  BACKGROUND   DuPont was originally the sole operator of the La Porte site. In recent years, however, DuPont had sold portions of the operations and leased its facilities to other companies, including Kuraraya and Invista.b Kuraray, Invista, and DuPont formed a consolidated ERT at the site, managed by DuPont but jointly staffed by members of the

a Kuraray is a chemical company that specializes in functional materials [169]. b Invista is a subsidiary of Koch Industries, Inc., that manufactures nylon, spandex, polyester, and specialty materials.

  Page  32  

La  Porte,  Texas  |  Incident  Date:  November  15,  2014  |  No.  2015-­01-­I-­TX   U.S.  Chemical  Safety  and   Hazard  Investigation  Board   Toxic  Chemical  Release  at  the   DuPont  La  Porte  Chemical  Facility   three companies.a All of the ERT members had other primary jobs for one of the three tenant companies (such as unit operators), and they responded as ERT members when alerted during emergencies. In its 2012 Risk Management Plan, DuPont La Porte stated that it used the National Incident Management System (NIMS) to systematically manage safety, tactics, strategy, personnel, equipment, and logistics, and to work seamlessly with any responding departments and agencies [7].b The site’s ERT was staffed by about 60 employees and had the following structure: •   Incident Command Organization: 2–4 trained incident commanders on each shift o   Training: National Pro Board Certifiedc as Fire Service Instructors (based on National Fire Protection Association, or NFPA, 1041 competencies), and Advanced Exterior Fire Fighters, Interior Structural Fire Fighters, and Industrial Fire Brigade Leaders (based on NFPA 1081 competencies) •   Fire Brigade Members: 12 members on each shift o   Training: National Pro Board Certified as Advanced Exterior Fire Fighters and Interior Structural Fire Fighters (based on NFPA 1081 competencies) •   Emergency Medical Services: 2–3 members on each shift o   Training: Texas Department of State Health Services–Certified Emergency Medical Technicians (EMTs), Basic and Intermediate Training •   Rescue Technicians: 3–5 members on each shift o   National Pro Board Certified in Rope, Confined Space, and High Line Rescue (based on NFPA 1006 competencies) •   HAZMAT Technicians: most ERT members o   Training: National Pro Board Certified (based on NFPA 472 competencies) Although ERT members were trained to perform emergency response functions, they were not trained on the specific hazards of each unit because there were many units within the three companies that processed various chemicals with different hazards. The La Porte site attempted to bridge this gap by designating a technical liaison position called the “process coordinator” to provide chemical hazard and unit-specific information about each of the processes to the ERT during an emergency. This position, along with the emergency operations

a Post-incident, on July 1, 2015, DuPont La Porte’s performance chemicals business unit was spun off to Chemours [107], [108, p. 35]. Chemours also provides ERT members to the La Porte site. b According to the U.S. Federal Emergency Management Agency (FEMA), “NIMS provides a common, nationwide approach to enable the whole community to work together to manage all threats and hazards. NIMS applies to all incidents, regardless of cause, size, location, or complexity” [132]. c The National Board on Fire Service Professional Qualifications (aka the Pro Board) is an accreditation body in the fire service training community. It accredits fire service training organizations, which in turn certify emergency responders to specific levels of training and competency in accordance with professional qualification consensus standards developed by the National Fire Protection Association [97].

  Page  33    

La  Porte,  Texas  |  Incident  Date:  November  15,  2014  |  No.  2015-­01-­I-­TX   U.S.  Chemical  Safety  and   Hazard  Investigation  Board   Toxic  Chemical  Release  at  the   DuPont  La  Porte  Chemical  Facility   center coordinators, was intended to play a critical role in interfacing with and helping to develop and execute emergency response actions with the ERT incident commander.   PROCESS  COORDINATOR  WAS  MISSING   The DuPont La Porte’s emergency response plan required the appointment of a shift “process coordinator” from each unit to assist the incident commander in providing technical knowledge specific about their unit. The emergency response plan defined the process coordinator as “the area emergency response director of the shop, warehouse, office building, or process unit involved in the incident who is responsible for developing an action plan with the Incident Commander and directing area resources.” The process coordinator was responsible for assisting the incident commander in several tasks during emergencies (see Figure 10), including the following:

  1.   Communicating (by radio) with the ERT’s incident commander and the site’s emergency operations

center, as the operations technical liaison

  1.   Determining the source and size of chemical leaks (see Figure 9)

Figure  9.    Responsibilities  of  the  Process  Coordinator  (Production  Shift  Supervisor).    In  the  Lannate®  Unit’s  emergency   planning  and  response  manual,  DuPont  La  Porte  provided  this  checklist  for  a  process  coordinator  to  use  to  gather   information.    Source:  DuPont.  

  1.   Deciding whether the site needs to perform off-site air monitoring
  2.   Deciding whether to evacuate the unit

  Page  34  

La  Porte,  Texas  |  Incident  Date:  November  15,  2014  |  No.  2015-­01-­I-­TX   U.S.  Chemical  Safety  and   Hazard  Investigation  Board   Toxic  Chemical  Release  at  the   DuPont  La  Porte  Chemical  Facility  

Figure  10.    A  Section  from  the  Lannate®  Unit’s  Emergency  Planning  and  Response  Manual.    It  details  the  process   coordinator’s  role  during  an  emergency.    Source:  DuPont.   As with most shifts, the Lannate® area process coordinator on the night of the incident was the Shift Supervisor. The Shift Supervisor in this case, however, was a victim of the toxic chemical release, and DuPont La Porte had not designated an on-site backup process coordinator for this shift.a As a result, these important functions were either performed in a disorganized manner by other operations personnel or never performed at all.

a The primary and secondary backup coordinator noted in Figure 10 were day shift employees and were not on-site at the time of the incident.

In DuPont’s emergency response critiques conducted after the incident, emergency response personnel communicated the following:

process. Personnel that would have staffed the technical specialists’ positions … were victims.”

  Page  35    

La  Porte,  Texas  |  Incident  Date:  November  15,  2014  |  No.  2015-­01-­I-­TX   U.S.  Chemical  Safety  and   Hazard  Investigation  Board   Toxic  Chemical  Release  at  the   DuPont  La  Porte  Chemical  Facility   GUIDANCE  TO  INDUSTRY   Specific technical knowledge from process unit experts—including technical and operations personnel—can be invaluable to the incident commander in an emergency at a chemical processing facility. The Hazardous Waste Operations and Emergency Response (HAZWOPER) standard identifies persons who can provide this information as specialist employees.a Companies need to ensure that these individuals are preidentified as technical support personnel and to provide backup capability for all situations in the event the primary technical support personnel are unavailable. The emergency response plan can address how technical and operations personnel are integrated into emergency response roles—the HAZWOPER standard requires that the emergency response plan address “personnel roles, lines of authority, training, and communication.”b When developing an emergency response plan, companies should also consider the nature and extent of duties designated to particular people to ensure they can reasonably carry out those duties during an emergency. One way companies can ensure that a backup is available during a shift is to have a recall list that identifies alternates who can provide technical support. The Center for Chemical Process Safety (CCPS) gives the following guidance in its book Guidelines for Technical Planning for On-Site Emergencies: Technical support consists of personnel within the organization and outside emergency response groups. Technical support personnel within the organization include engineers, chemists, operators, maintenance personnel, and managers having special knowledge of process operations, emergency systems, building plans and equipment layout, and hazardous materials present. A technical support team consisting of these experts or others with similar qualifications will provide the incident commander with a pool of knowledge to draw on during emergencies. Technical support team members should be placed on the recall list with designated alternates in the event team members are directly involved with the emergency or are not available 8, pp. 283-284. Another valuable tool that an emergency response team can use is a checklist. As suggested by CCPS, Planners should develop emergency action checklists to augment the emergency plan by providing memory joggers for actions. Action checklists are concise reminders to personnel of key actions that need to be undertaken [8, pp. 158-159].

a The HAZWOPER standard defines specialist employees as “employees who, in the course of their regular job duties, work with and are trained in the hazards of specific hazardous substances, and who will be called upon to provide technical advice or assistance at a hazardous substance release incident to the individual in charge”; it further specifies that they “shall receive training or demonstrate competency in the area of their specialization annually” (29 C.F.R. § 1910.120 (q)(5)). b 29 C.F.R. § 1910.120 (q)(2)(ii).

  Page  36  

La  Porte,  Texas  |  Incident  Date:  November  15,  2014  |  No.  2015-­01-­I-­TX   U.S.  Chemical  Safety  and   Hazard  Investigation  Board   Toxic  Chemical  Release  at  the   DuPont  La  Porte  Chemical  Facility   A company can develop these checklists in the incident response planning stage and use them during emergencies to ensure proper performance of important emergency response tasks like those DuPont assigned to the process coordinator, even in scenarios in which the primary assignee is unavailable.   DELAY  IN  ERT  READINESS  TO  SEARCH  FOR  MISSING  WORKERS   It took 35 minutes from the request for ERT assistance for the La Porte ERT to initiate the first entry into the manufacturing building to search for the missing workers. Discussed below, miscommunication, the lack of a process coordinator, and inadequate emergency preparation by DuPont all contributed to the ERT’s delayed response. 4.3.1  CALL  FOR  ERT  RESPONSE   When the Board Operator made his call for ERT assistance over the intercom system, he stated, “We need rescue people, and there’s people missing.” To the ERT, rescue specifically meant retrieval of a person from an area, so the team brought to the scene only technical rescue gear (e.g., ropes and harnesses). As discussed in Section 2.2, ERT members realized upon arrival that contrary to their presumption, there was a chemical release and they needed additional PPE. DuPont provided the CSB with a May 2014 slide presentation for new employees showing the structure of the ERT and how to request assistance from the ERT. The presentation detailed the differences in response groups (fire brigade, EMT, rescue, and fume release). While some operations personnel may have understood the organization of the ERT, a key problem at the time of the request for the ERT during the incident under study was that the incident was not yet fully understood. As a result, important details could not be communicated in the initial ERT call. In addition, DuPont lacked an on-site backup process coordinator to communicate and coordinate response operations with the ERT. In one of DuPont’s emergency response critiques conducted after the incident, emergency response personnel communicated the following:

For [a request for] rescue, only rescue responds, and for [a request for] ERT (fume/fire) then everyone responds.”

realizing that [the] leader had been lost. Operators were lost. No one [in the unit] knew how ERT worked.”

  Page  37    

La  Porte,  Texas  |  Incident  Date:  November  15,  2014  |  No.  2015-­01-­I-­TX   U.S.  Chemical  Safety  and   Hazard  Investigation  Board   Toxic  Chemical  Release  at  the   DuPont  La  Porte  Chemical  Facility   GUIDANCE  TO  INDUSTRY   Plant emergency procedures should clearly define the alerting and notification process for different types of plant emergencies. These procedures should also include guidance for situations in which initial information to effectively assess the nature of the problem and the amount and type of ERT resources required is incomplete. 4.3.2  ERT  MINI-­‐PUMPER  TRUCK  NOT  OPERATIONAL   When the ERT learned that the incident involved a chemical release, the Incident Commander asked ERT members to come to the scene with bunker gear and SCBAs. ERT members stored their SCBAs on a mini- pumper truck. When an ERT member tried to start this mini-pumper truck to bring the gear to the site where it was needed,a the vehicle did not start because of multiple mechanical malfunctions. An October 2, 2014, work order states, “Check[ed] batteries and they were not good, remove[d] and replace[d] with new ones.” Replacing the batteries, however, did not fully repair the truck, which failed to start at the time of the incident, impairing the effectiveness of the ERT response. After the incident, DuPont La Porte personnel replaced the truck’s alternator, battery cable, and belts to make it operable. Although the pumper truck was a critical piece of emergency response equipment, DuPont La Porte did not adequately maintain it before the incident to ensure its availability during an emergency. Since the mini-pumper truck holding SCBAs could not come to the scene, the ERT assigned an operator to retrieve additional SCBAs in the Lannate® Unit for the ERT to use.b Retrieving the SCBAs may have exposed the operator to a high methyl mercaptan concentration because these SCBAs were downwind of the methyl mercaptan release point (Section 4.7).

a The pumper truck was a Ford F-450 Mini Pumper. b The SCBAs on the truck were rated for 60 minutes. Initially, the ERT had to use SCBAs from the area that were rated for 30 minutes. Later on, 60-minute SCBAs were transported to the scene.

In DuPont’s emergency response critiques conducted after the incident, emergency response personnel communicated:

Perform maintenance in a timely fashion to ensure the functionality and reliability.”

and [think] it won’t happen to us, and it did.”

  Page  38  

La  Porte,  Texas  |  Incident  Date:  November  15,  2014  |  No.  2015-­01-­I-­TX   U.S.  Chemical  Safety  and   Hazard  Investigation  Board   Toxic  Chemical  Release  at  the   DuPont  La  Porte  Chemical  Facility   GUIDANCE  TO  INDUSTRY   Under the HAZWOPER standard, an emergency response plan must address PPE and emergency equipment,a such as the SCBAs and mini-pumper truck. It should also contain information on how to ensure that PPE and emergency equipment are always functional. Even though industrial facilities may call upon emergency response vehicles infrequently, it is essential that these vehicles operate as intended when needed. To ensure emergency vehicle reliability, companies need to develop and apply regular maintenance schedules. The National Fire Protection Association’s Standard for the Inspection, Maintenance, Testing, and Retirement of In-Service Emergency Vehicles (NFPA 1911) requires weekly visual and operational checks for emergency vehicles.b Annex C of NFPA 1911, titled Developing a Preventive Maintenance Program, also provides guidance and example checklists to use when performing preventive maintenance on emergency vehicles [9, pp. 79-99].   THE  SEARCH  FOR  MISSING  WORKERS  WAS  HIGH  RISK     When the HAZMAT-trained ERT members and the necessary PPE arrived at the scene of the release, the emergency response still faced three major issues:

  1.   The ERT initially did not use air monitoring equipment to identify whether the building had an

explosive atmosphere.

  1.   Emergency responders did not know the locations of the missing workers.
  2.   Emergency responders were not familiar with the layout of the building and processes.

While no emergency responders were injured, operations under these conditions exposed responders to increased risk. 4.4.1  ENTRY  INTO  POTENTIALLY  EXPLOSIVE  ATMOSPHERE   During the incident, Harris County emergency responders used a QRAE monitorc and a MultiRAE monitord during their building entries. These monitors can inform personnel whether the environment is explosive or

a 29 C.F.R. § 1910.120 (q)(2)(xi). b The 2017 version of NFPA 1911 states, “A visual and operational check of the apparatus shall be performed within 24 hours of a run or at least weekly” [9, p. 17]. The 2012 version of NFPA 1911, which was the applicable standard at the time of the incident, states, “An operational check and visual check of the fire apparatus shall be performed on a daily/weekly basis to ensure the operational readiness of the unit” [98, p. 13]. c The QRAE monitor is a four-sensor monitor specifically manufactured by RAE to continuously monitor, for example, oxygen, percentage of lower explosive limit, and toxic gases [124]. d The MultiRAE monitor, specifically manufactured by RAE, has up to six gas sensors to continuously monitor, for example, percentage of lower explosive limit (LEL), oxygen, and toxic gases [123]. To obtain percentage LEL, this type of detector is typically calibrated using methane, and the user multiplies the percentage LEL reading by a given correction factor to obtain the percentage LEL of the chemical of interest [84].

  Page  39    

La  Porte,  Texas  |  Incident  Date:  November  15,  2014  |  No.  2015-­01-­I-­TX   U.S.  Chemical  Safety  and   Hazard  Investigation  Board   Toxic  Chemical  Release  at  the   DuPont  La  Porte  Chemical  Facility   immediately dangerous to life or health (IDLH). Colorimetric gas detection tubes (e.g., Dräger-Tubes) can also measure gas concentrations during emergencies.a Air monitoring by ERT personnel is a critical element in employing a risk-based emergency response operation.b Failure to conduct air monitoring increases the potential for significant risks to emergency responders, employees, and the public, and it can lower the probability of a safe and effective emergency response. Emergency responders typically use portable air monitors to measure gas concentrations during entries into hazardous areas. During the ERT’s initial entry into the manufacturing building to search for the missing workers, ERT members did not use air monitoring equipment to characterize the building atmosphere. DuPont La Porte had assigned operations personnel to maintain and control air monitoring equipment within each of their business units to be made available to the incident commander or the process coordinator during emergencies. The DuPont La Porte emergency response plan identifies the incident commander as being responsible for directing personnelc to conduct air monitoring downwind of the release. There was a delay in air monitoring inside the building, and the ERT could not determine if there was an explosive atmosphere (methyl mercaptan is a flammable gas)d during the initial entry into the manufacturing building.e Without this monitoring, the ERT may have unknowingly entered an explosive atmosphere. Later, the ERT entered the building with other external emergency response groups that had air monitoring equipment. The potential for a methyl mercaptan explosion in the building posed a serious hazard to emergency responders, due to both the inherent explosion effects (e.g., overpressure, shrapnel) and the structural collapse risk (Section 4.4.3). GUIDANCE  TO  INDUSTRY   Entering a structure with an unknown environment may pose additional risks to emergency responders. For example, it may have the potential to be explosive, as in the situation at DuPont La Porte. Recognizing the issues associated with uncharacterized environments, the HAZWOPER standard requires the individual in charge (here, the incident commander) to identify to the extent possible “all hazardous substances or conditions present and shall address as appropriate site analysis, use of engineering controls, maximum exposure limits, hazardous substance handling procedures, and use of any new technologies.”f Additionally, the HAZWOPER

a “Dräger-Tubes are glass vials filled with a chemical reagent that reacts to a specific chemical or family of chemicals. A calibrated 100 ml sample of air is drawn through the tube. If the targeted chemical(s) is present, the reagent in the tube changes color and the length of the color change typically indicates the measured concentration” [125]. b A risk-based emergency response operation is an approach that sets policy and programmatic priorities based upon measured levels of risk to lives, property, and the environment [165, p. 6]. c Personnel can be either mechanics, operators, or emergency response personnel who are trained on air monitoring equipment and familiar with the area. d Methyl mercaptan is flammable at concentrations between 3.9 percent and 21.8 percent by volume [50]. e At approximately 7:30 am, the ERT was pulled out of the building to resolve issues with PPE because it was determined that methyl mercaptan posed a flammability risk. f 29 C.F.R. § 1910.120 (q)(3)(ii).

  Page  40  

La  Porte,  Texas  |  Incident  Date:  November  15,  2014  |  No.  2015-­01-­I-­TX   U.S.  Chemical  Safety  and   Hazard  Investigation  Board   Toxic  Chemical  Release  at  the   DuPont  La  Porte  Chemical  Facility   standard also identifies a safety officer as an individual who assists the incident commander in identifying these hazardsa and makes safety decisions surrounding them.b This standard gives the incident commander the responsibility of determining the risks associated with the emergency response using available personnel and tools (emergency equipment and PPE). Before directing emergency response activities, the nature of the hazards needs to be identified and characterized to determine the appropriate actions to be taken. Incident commanders, safety officers, and other emergency response personnel can look to industry guidance to help them determine the safest course of action in a given situation. For example, NFPA 472, Standard for Competence of Responders to Hazardous Materials/Weapons of Mass Destruction Incidents, gives illustrative example conditions—including those conditions present during the DuPont La Porte incident—in which NFPA recommends prohibiting emergency response personnel from entering the hot zone. They include, among other conditions: •   flammable or explosive atmosphere present and •   insufficient personnel to perform tasks [10, p. 100]. One method emergency responders can use to characterize unknown environments is air monitoring. To ensure that emergency responders can perform air monitoring of hazardous atmospheres, industrial facilities should provide ERT members with their own air monitoring equipment and train them in how to operate it (e.g., NFPA 472 requires that hazardous materials technicians be able “through detection, monitoring, and sampling,… [to] verify the presence of hazardous materials… [and] determine the concentration of hazardous materials in the atmosphere” [10, pp. 42-43]). If facilities choose to assign maintenance and storage of portable air monitoring equipment to non-ERT members, the company should also ensure that the ERT can readily locate and access the stored equipment. 4.4.2  NO  TECHNOLOGY  TO  LOCATE  MISSING  WORKERS   DuPont La Porte did not equip the manufacturing building with technology either to account for the entry of personnel into the building or to track their location once inside. The manufacturing building processed highly hazardous chemicals—including methyl mercaptan and chlorine—in an enclosed environment. Companies can use technology (such as cameras, badges, or chip readers) to track the locations of personnel upon entry into high-hazard areas or in the event of an incident. Knowing the location of personnel could help emergency responders conduct targeted rescues by allowing them to reach affected personnel quickly and minimize ERT member exposure to hazardous environments.

a “The individual in charge of the [incident command system] shall designate a safety officer, who is knowledgeable in the operations being implemented at the emergency response site, with specific responsibility to identify and evaluate hazards and to provide direction with respect to the safety of operations for the emergency at hand” (29 C.F.R. § 1910.120 (q)(3)(vii)). b “When activities are judged by the safety officer to be an IDLH and/or to involve an imminent danger condition, the safety officer shall have the authority to alter, suspend, or terminate those activities. The safety official shall immediately inform the individual in charge of the [incident command system] of any actions needed to be taken to correct these hazards at the emergency scene” (29 C.F.R. § 1910.120 (q)(3)(viii)).

  Page  41    

La  Porte,  Texas  |  Incident  Date:  November  15,  2014  |  No.  2015-­01-­I-­TX   U.S.  Chemical  Safety  and   Hazard  Investigation  Board   Toxic  Chemical  Release  at  the   DuPont  La  Porte  Chemical  Facility   GUIDANCE  TO  INDUSTRY   Facilities that handle large quantities of flammable or toxic chemicals have a responsibility to monitor high- hazard areas, such as DuPont’s Lannate® manufacturing building, for releases and personnel injuries. That monitoring capability must be available to emergency response personnel to assess the scope and nature of any incident, including possible locations of employees within the area. High-hazard areas should be equipped with sufficient monitoring devices, such as detectors, alarms, and surveillance technology, to identify whether there is a chemical release (or other type of emergency) and whether personnel are affected.a When surveillance cameras are used, companies should consider having the camera feeds go to multiple plant locations, including control rooms, plant security stations, and the plant emergency operations center (EOC). 4.4.3  UNRECOGNIZED  MANUFACTURING  BUILDING  COLLAPSE  HAZARD   A 2002 DuPont La Porte facility siting study predicted potential damage to the manufacturing building based upon various explosion scenarios. In the analysis of a hypothetical methyl mercaptan explosion on the first floor of the manufacturing building, the study listed the “Predicted Building Damage Level” as “Collapse []-Building fails completely. Repair is not feasible.” Neither DuPont La Porte’s emergency response plan nor the Lannate® Unit’s emergency planning and response manual included information from the 2002 study on the potential risk of structural collapse in the event of an explosion. DuPont La Porte did not have a system in place to ensure that emergency planning documents were updated when site studies, such as a process hazard analysis (PHA), identified relevant information. Consequently, the emergency planning documents did not prepare ERT members for the risk that the manufacturing building could collapse. Although an explosion did not occur and the manufacturing building did not collapse, entry into the manufacturing building posed a serious safety risk to members of the ERT during emergency response activities following a significant methyl mercaptan release. GUIDANCE  TO  INDUSTRY   NFPA 1620, Standard for Pre-incident Planning, states, “The pre-incident plan shall address the structural integrity of walls, roofs, and floors” [11, p. 9]. This standard is intended to provide information to the incident commander. To help emergency responders become knowledgeable of known unit hazards, companies should develop a system to update emergency planning documents when other studies identify pertinent hazards and risks.

a According to Sutton, author of Plant Design and Operations, closed circuit television (CCTV) “can help with fire response—not so much with the initial detection but in providing information that can help with control of the facility and direction of the emergency response team. Cameras can be installed in a fixed position focused on high-risk areas or may permanently scan large areas.… Typical locations for CCTV cameras are pump floors in process and oil movement areas, road/railcar loading areas, jetties, and buildings that contain process equipment” [85, p. 203].

  Page  42  

La  Porte,  Texas  |  Incident  Date:  November  15,  2014  |  No.  2015-­01-­I-­TX   U.S.  Chemical  Safety  and   Hazard  Investigation  Board   Toxic  Chemical  Release  at  the   DuPont  La  Porte  Chemical  Facility     DIFFICULTIES  NAVIGATING  MANUFACTURING  BUILDING     Many of the emergency responders searching the manufacturing building worked at the La Porte site as operators in other units or for other companies located there. Some of these responders, therefore, were unfamiliar with the manufacturing building—a four-story building containing a large amount of piping and process equipment, dividing walls, multiple stairwells, and an elevator. Figure 11 shows photos taken inside the manufacturing building, illustrating the complexity of the layout inside the building.

Figure  11.    Photos  of  the  Interior  of  the  Lannate®  Manufacturing  Building.    Source:  CSB.   The CSB found that the Lannate® Unit’s emergency planning and response manual did not have a building map or floor plan to aid emergency responders in understanding and navigating the manufacturing building during the incident. Emergency responders assigned Lannate® Unit operators—including the Board Operator—to draw maps of the manufacturing building to assist in the search. The Board Operator informed the CSB as follows: They got the big pad … and had me sit down and start drawing pictures. And [the emergency responder] said, “We want it as detailed as you can get.” So, I drew the building, I drew the stairwells, I drew the reactors, what reactors were where, you know, and coolers, you know, on each floor. That’s what they wanted me to do, draw a description of each floor as well as I could … so when they go in, they know where they’re going. They can look, and of course three of [the missing operators were] found already, but they never did—at that time, they didn’t know where [the fourth missing operator] was.… It took me about an hour and a half to draw stuff, you know.

  Page  43    

La  Porte,  Texas  |  Incident  Date:  November  15,  2014  |  No.  2015-­01-­I-­TX   U.S.  Chemical  Safety  and   Hazard  Investigation  Board   Toxic  Chemical  Release  at  the   DuPont  La  Porte  Chemical  Facility   Seven months before the incident, DuPont La Porte performed a response drill for operators in the Lannate® Unit and developed a follow-up action item that “plot plans should be readily available for responder reference” (Figure 12). The CSB found that the drill leader, however, did not assign this action item to specific personnel or input the item into the site’s action item tracking system. Consequently, no one took responsibility for the action items, and the recommended plot plans were never created.

Figure  12.    Excerpt  from  an  April  2014  Drill  Follow-­‐Up.    It  recommended  that  plot  plans  be  readily  available   for  responder  reference.    A  plot  plan  was  never  made  for  the  manufacturing  building.    Source:  DuPont.    

GUIDANCE  TO  INDUSTRY   Although the HAZWOPER standard requires that emergency response plans detail evacuation routes, evacuation procedures, safe distances, and places of refuge, it does not specifically require development of plot plans.a NFPA 1620, Standard for Pre-incident Planning, on the other hand, supports the development of plot plans in complex hazardous environments. The standard establishes criteria for developing “pre-incident plans to assist personnel in effectively managing incidents and events for the protection of occupants, responding personnel, property, and the environment” [11, p. 5]. It also defines different complexity levels of pre-incident plans: (1) Level 1, Basic, (2) Level 2, Intermediate, and (3) Level 3, Comprehensive. NFPA 1620 states, Level 3 information is the most detailed level of pre-incident planning and is intended to include process hazards and protection schemes, detailed occupancy considerations, room or area layouts, and operational features (e.g. ventilation, power) [11, p. 17]. (emphasis added) In addition, it is a good practice for site-level emergency responders—and external emergency response groups—to be familiar with the layout of enclosed buildings within chemical facilities in the event of an emergency. Familiarity with buildings and process areas can reduce recovery time and aid in life-saving rescue

a 29 C.F.R. § 1910.120 (q) (February 8, 2013).

  Page  44  

La  Porte,  Texas  |  Incident  Date:  November  15,  2014  |  No.  2015-­01-­I-­TX   U.S.  Chemical  Safety  and   Hazard  Investigation  Board   Toxic  Chemical  Release  at  the   DuPont  La  Porte  Chemical  Facility   operations. Periodic drills inside process structures can help familiarize responders with the buildings and improve responder navigation during emergencies.a To help prepare for emergencies, chemical facilities should do the following:

  1.   Develop site maps and plot plans of the facility, including the layout of process buildings. Ensure these

maps are up-to-date and readily available to emergency responders.

  1.   Coordinate regularly scheduled site tours for both plant and external emergency responders to establish

strong working relationships and help ensure emergency responders are familiar with facility access points, hazards, emergency response issues, and site or facility layout.b

  1.   Familiarize responders with process structures or buildings to improve responder navigation during

emergencies by having periodic drills inside them at established, recurring intervals. To enhance responder performance, members of an emergency response team should train together, especially in situations in which multiple companies are staffing a single team.

a NFPA 1, Fire Code, Annex D, “Hazardous Materials Management Plans and Hazardous Materials Inventory Statements,” requires detailed site, building, and structure drawings. Additionally, facilities are required to have inventory assessments that include chemical names and their common names. Annex D is not a requirement of NFPA 1 unless it is specifically adopted [106, pp. 731-740]. b NFPA 600, Standard on Industrial Fire Brigades, states, “Facility fire brigade management should maintain a close working relationship with all emergency response organizations that could reasonably be expected to respond to the facility during an incident. This relationship should include … an invitation to the emergency response organizations to participate in a pre-fire planning walk-through or tour of the facility” [103, p. 19].

  Page  45    

La  Porte,  Texas  |  Incident  Date:  November  15,  2014  |  No.  2015-­01-­I-­TX   U.S.  Chemical  Safety  and   Hazard  Investigation  Board   Toxic  Chemical  Release  at  the   DuPont  La  Porte  Chemical  Facility     NO  ANALYSIS  OF  PROCESS  DATA  TO  IDENTIFY  SOURCE  OF  LEAK   DuPont La Porte had installed an emergency isolation valve for the methyl mercaptan storage tank. Companies often install emergency isolation valves to avoid the need to isolate chemical release points manually during large releases of a flammable or toxic chemical; locations for such valves include, for example, points near property lines, at the boundaries of process units, or at liquid outlets of vessels containing flammable or toxic chemicals.a The installation and use of these valves can help prevent someone from having to enter a flammable or toxic atmosphere to stop a chemical release. Even though the methyl mercaptan storage tank had an emergency isolation valve, its closure was significantly delayed. The release began just after 3:00 am, but

  1.   the methyl mercaptan storage tank pump was not turned off until 6:02 am—three hours after the release

began—significantly reducing the rate of the methyl mercaptan release, and

  1.   the methyl mercaptan storage tank emergency isolation valve was not closed until 10:07 am—seven

hours after the release began—finally isolating the methyl mercaptan storage tank from the process (Figure 13).

a Emergency isolation valves could be designed to (1) close automatically, for example, during an emergency shutdown of a unit; (2) close remotely, by manual activation; or (3) be manually closed [81, pp. 123-124]. Figure  13.    Location  of  Methyl  Mercaptan  Emergency  Isolation  Valve  Relative  to  Manufacturing  Building  Where  Leak  Occurred.    The  emergency  isolation  valve  was  not  activated  until  seven  hours  after  the   release  began.    Source:  Google  Earth,  with  annotations  by  CSB.

  Page  46  

La  Porte,  Texas  |  Incident  Date:  November  15,  2014  |  No.  2015-­01-­I-­TX   U.S.  Chemical  Safety  and   Hazard  Investigation  Board   Toxic  Chemical  Release  at  the   DuPont  La  Porte  Chemical  Facility   Earlier performance of these two critical equipment manipulations could have controlled the release much sooner. The CSB determined that the delay in isolating the methyl mercaptan storage tank from the process occurred for two reasons:

  1.   Personnel did not recognize the need to close the methyl mercaptan storage tank isolation valve when

they determined that methyl mercaptan was the chemical being released inside the manufacturing building.

  1.   No one evaluated process data to determine what was causing the release until hours into the response

efforts. Had personnel looked at the process data earlier during the release, it should have been clear that methyl mercaptan was flowing from the methyl mercaptan storage tank, requiring closure of the emergency isolation valve (Figure 14).

The CSB identified three causes for not analyzing process data earlier during the release: Figure  14.    Process  Data  from  November  15,  2014.    Data  shows  that  methyl  mercaptan  was   abnormally  flowing  from  the  methyl  mercaptan  storage  tank.    No  one  analyzed  these  data  during   the  first  hours  of  the  incident.    Source:  CSB  graph  based  on  DuPont  data.

  Page  47    

La  Porte,  Texas  |  Incident  Date:  November  15,  2014  |  No.  2015-­01-­I-­TX   U.S.  Chemical  Safety  and   Hazard  Investigation  Board   Toxic  Chemical  Release  at  the   DuPont  La  Porte  Chemical  Facility  

  1.   The Lannate® Unit’s Shift Supervisor (Process Coordinator), who was responsible for determining the

source of any chemical release and identifying the valves to close to stop the release, had been overcome by methyl mercaptan exposure, and there was no designated backup on shift (Section 4.2).

  1.   During the chemical release, the Board Operator, who could have analyzed the process data, was

repeatedly pulled away from monitoring the process to communicate with emergency responders and perform tasks such as drawing maps of the building (Section 4.5).

  1.   Even though there was a troubleshooting operation going on in the Lannate® Unit before the release,

there was no technical or engineering support on-site to help the operators if the Lannate® process responded abnormally. Site personnel did not contact the on-call DuPont La Porte technical employeesa during the early stages of the incident for assistance in identifying the source of the methyl mercaptan release (Section 4.6). GUIDANCE  TO  INDUSTRY   When a process safety incident such as a chemical release occurs, it can be beneficial for technical personnel who are not immediately involved in emergency response functions to analyze process data and quickly identify the cause, scope, and magnitude of the incident. This analysis will help the company (or incident commander) identify needed equipment manipulations to stop or control the incident, such as shutting down equipment or closing isolation valves, to mitigate the effects of a release and the threat to responders and the public. In Guidelines for Technical Planning for On-Site Emergencies, CCPS provides guidance on the possible emergency roles of various plant personnel during an incident 8, p. 161.

a The DuPont La Porte technical employees were contacted individually throughout the morning by a variety of persons.

  Page  48  

La  Porte,  Texas  |  Incident  Date:  November  15,  2014  |  No.  2015-­01-­I-­TX   U.S.  Chemical  Safety  and   Hazard  Investigation  Board   Toxic  Chemical  Release  at  the   DuPont  La  Porte  Chemical  Facility  

Figure  15.    Example  Roles  for  Various  Plant  Personnel  During  and  after  an  Emergency.     Source:  CCPS.  

  INADEQUATE  CREATION  AND  CONTROL  OF  HOT  ZONE   The ERT did not adequately establish, physically mark, or communicate the boundary of the hot zone during the early stages of the emergency response efforts. The zone was physically marked only after external emergency services groups arrived at the scene. The absence of a clear hot zone boundary as part of the early emergency response led to poor incident scene control, including trouble determining who had entered and exited the hot zone and whether they were wearing proper PPE.

  Page  49    

La  Porte,  Texas  |  Incident  Date:  November  15,  2014  |  No.  2015-­01-­I-­TX   U.S.  Chemical  Safety  and   Hazard  Investigation  Board   Toxic  Chemical  Release  at  the   DuPont  La  Porte  Chemical  Facility   During the incident, the ERT asked an operator who was not an ERT member (Operator 7) to assist the team by retrieving SCBAs from the Lannate® Unit. Because the hot zone was not physically defined, and entry/exit control points were not staffed and controlled, the operator did not realize the SCBAs were in a potentially hazardous location. She entered the hot zone without respiratory protection and, based on the symptoms she exhibited, believes she was exposed to a high concentration of methyl mercaptan (Figure 6). GUIDANCE  TO  INDUSTRY   The establishment, communication, and control of a hot zone is necessary to help protect plant personnel and emergency responders. Under the HAZWOPER standard, an emergency response plan must address “safe distances and places of refuge.”a An emergency response plan can provide guidance in determining safe distances and places of refuge for different types of emergencies and in effectively communicating these zones. Companies can look to voluntary consensus standards for guidance on how to establish hot zones. For example, NFPA 472, Standard for Competence of Responders to Hazardous Materials/Weapons of Mass Destruction Incidents, requires that the hazardous materials safety officerb “identify whether the boundaries of the established control zones are clearly marked … and are being maintained” and “verify that each team is protected and prepared to perform its assigned tasks by … verify[ing] whether the selection of PPE and equipment is consistent with the site safety and control plan” [10, p. 61]. Once personnel establish and communicate a hot zone, they must control entry and exit. HAZWOPER states that the incident commander “shall limit the number of emergency response personnel at the emergency site, in those areas of potential or actual exposure to incident or site hazards, to those who are actively performing emergency operations. However, operations in hazardous areas shall be performed using the buddy system in groups of two or more.”c These requirements help ensure that emergency response personnel minimize their potential exposure to hazards.

a 29 C.F.R. § 1910.120 (q)(2)(iv). b The hazardous materials safety officer is part of the incident command system and ensures that safe practices are followed during hazardous materials incidents [10, p. 58]. c 29 C.F.R. § 1910.120 (q)(3)(v). In one of DuPont’s emergency response critiques conducted after the incident, emergency response personnel communicated: “Weakness: Visual markers and communication of the control zone boundaries.”

  Page  50  

La  Porte,  Texas  |  Incident  Date:  November  15,  2014  |  No.  2015-­01-­I-­TX   U.S.  Chemical  Safety  and   Hazard  Investigation  Board   Toxic  Chemical  Release  at  the   DuPont  La  Porte  Chemical  Facility   To prevent a similar hazardous situation to personnel assisting industrial emergency response teams, companies should ensure that emergency response team members are trained (1) to physically designate the hot zone, and (2) to communicate the location of the hot zone and its entry control points to all personnel assisting with the emergency response, including operations personnel.   DEFICIENCIES  IN  EVALUATING  RISK  TO  THE   PUBLIC   DuPont La Porte did not effectively evaluate the impact of a potential major methyl mercaptan release on members of the public. Site personnel had several available methods (discussed below) to help identify whether a hazardous concentration of toxic methyl mercaptan was traveling off-site. As discussed in this section, the emergency responders •   used a model of the chemical release that had inaccurate model inputs, •   did not use available on-site methyl mercaptan concentration data to evaluate the potential for an off- site release, •   misinterpreted methyl mercaptan physical property data by mistakenly believing methyl mercaptan was lighter than air and would not expose people off-site to hazardous concentrations, •   did not adequately communicate to external emergency response parties the name of the chemical being released, and •   did not perform air monitoring during the release to predict possible off-site consequences. Although there was a potential that methyl mercaptan may have exceeded ERPG-3a concentrations outside the fence line (see ERPG Levels box), the CSB is not aware of the actual

a The ERPG values for methyl mercaptan in parts per million are ERPG-1, 0.005; ERPG-2, 25; ERPG-3, 100 [82]. People can typically detect methyl mercaptan odor at about 2 parts per billion (ppb) [80, p. 1].

Emergency Response Planning Guidelines (ERPGs) are chemical concentration levels used when preparing for and responding to emergencies. They are designed to anticipate public health effects, not occupational health effects, from exposure to airborne chemicals. The three ERPG levels are as follows: ERPG-3: The maximum airborne concentration below which nearly all individuals could be exposed for up to one hour without experiencing or developing life-threatening health effects. ERPG-3 is a worst-case planning level. Exposure to concentrations above the ERPG-3 level will be lethal to some members of the community. ERPG-2: The maximum airborne concentration below which nearly all individuals could be exposed for up to one hour without experiencing or developing irreversible or other serious health effects, or symptoms that could impair an individual’s ability to take protective action. At concentrations above ERPG-2, some members of the community may experience significant health effects, which could impair them from taking protective action. Emergency responders often alert the community to take protective action in areas susceptible to the ERPG-2 concentration and above. ERPG-1: The maximum airborne concentration below which nearly all individuals could be exposed for up to one hour without experiencing more than mild, transient adverse health effects or without perceiving a clearly defined objectionable odor [86].

ERPG  Levels  

  Page  51    

La  Porte,  Texas  |  Incident  Date:  November  15,  2014  |  No.  2015-­01-­I-­TX   U.S.  Chemical  Safety  and   Hazard  Investigation  Board   Toxic  Chemical  Release  at  the   DuPont  La  Porte  Chemical  Facility   concentrations because timely air monitoring was not performed. Additionally, the CSB is unaware of any reported off-site injuries. 4.8.1  RELEASE  MODELING   The ERT used software called SAFERa to model chemical releases in real time to help identify areas susceptible to hazardous concentrations of the chemical being released. Chemical release modeling is commonly used for assessing response scenarios during the emergency planning process and can also be used as part of incident management activities during a response. Its use is dependent upon having accurate source data, such as the chemical release rate. To create an effective model of a chemical release, SAFER needs an estimated chemical release rate based on accurate data. The Lannate® Unit’s emergency planning and response manual called for the SAFER operator to create a model of the release. Because there was no air monitoring information available, the SAFER operator estimated a release rate based upon an ERT member’s observations regarding the relative strength of the chemical odor outside of the manufacturing building. The SAFER operator informed the CSB as follows: Once I found out what the chemical was—methyl mercaptan—I plugged it in [to SAFER] and we still didn’t know what kind of release rate we had. So, I went ahead and plugged in 10 pounds [per hour] because based on what [they’re] telling me [they] could barely smell anything. I didn’t realize it was a significant release. … So, I just had to plug something in, so I plugged in 10 pounds an hour release rate. … We were just guessing at the release rate. Using the estimated release rate of 10 pounds per hour, the SAFER software predicted that a hazardous concentration of methyl mercaptan would not leave the company property. In part because the software model showed the chemical was not hazardous off-site, DuPont La Porte did not notify the authorities to alert the community to shelter-in-place or to divert traffic from the nearby Highway 225 (Figure 16).

a At the time of the incident, DuPont La Porte was using SAFER Real-Time to do its emergency response dispersion modeling. This program is no longer supported, and SAFER has transitioned this program to SAFER TRACE [99].

  Page  52  

La  Porte,  Texas  |  Incident  Date:  November  15,  2014  |  No.  2015-­01-­I-­TX   U.S.  Chemical  Safety  and   Hazard  Investigation  Board   Toxic  Chemical  Release  at  the   DuPont  La  Porte  Chemical  Facility  

Companies should not rely on unsupported data when making critical emergency response decisions, such as those affecting workers or the surrounding public and community. Companies are best positioned to determine the types of hazards that their processes and chemicals pose. Moreover, in developing emergency response plans, companies can develop scenarios for potential releases, which can be an important resource during an emergency. The U.S. Department of Transportation’s (DOT) 2016 Emergency Response Guidebooka provides a format that can be used by companies to guide initial emergency response.b Table 1 in the guidebook provides

a The 2016 Emergency Response Guidebook is a joint publication of Transport Canada, the U.S. Department of Transportation (DOT), and the Secretariat of Communications and Transport of Mexico, with collaboration from Centro de Información Química para Emergencias of Argentina. The guidebook “is primarily a guide to aid first responders in quickly identifying the specific or generic hazards of the material(s) involved in the incident, and protecting themselves and the general public during the initial response phase of the incident.” It is primarily intended for use in transportation incidents involving dangerous goods [12, p. 358]. b The CSB has found in several of its investigations that application of the Emergency Response Guidebook may not be appropriate at all fixed industrial facilities due to larger quantities of chemicals at fixed facilities, hazardous process conditions, or possible proximity to other hazardous chemicals [142, p. 1]. Fixed facilities may find guidance in the Emergency Response Guidebook beneficial in some scenarios, but such facilities should also consider other information when conducting emergency response operations, such as equipment inventory, site-specific emergency response plans, and company-specific safety data sheets. If a site does use the Emergency Response Guidebook as an initial reference early in the release, process data, equipment inventory, and specific site hazards should always be evaluated to help determine effective emergency response operations.

Figure  16.    Overhead  Image  of  DuPont  La  Porte  Facility.    A  plume  of  methyl  mercaptan  left  the  DuPont  property  in  a   southeasterly  direction  toward  a  major  highway  and  residential  area.    Source:  Google  Earth,  with  annotations  by  CSB.    

  Page  53    

La  Porte,  Texas  |  Incident  Date:  November  15,  2014  |  No.  2015-­01-­I-­TX   U.S.  Chemical  Safety  and   Hazard  Investigation  Board   Toxic  Chemical  Release  at  the   DuPont  La  Porte  Chemical  Facility   standardized instructions for determining the isolation and protective action distances for small and large spills by predicting the size of downwind areas that could be affected by a cloud of toxic gas [12, p. 292]. This information is used as initial guidance to determine the size of the public area that should be alerted to take protective measures, including evacuation. The 2016 Emergency Response Guidebook is intended to be a reference for emergency responders during transportation emergency events that could affect the public. It has limitations when it comes to fixed chemical facilities. For example, in the guidebook, a large spill is anything greater than 55 gallons, yielding a very wide range in spill amounts. On the night of the incident, approximately 2,530 gallons of methyl mercaptan was released inside the Lannate® Unit,a which is about 46 times larger than 55 gallons. Even at 55 gallons, the guidebook recommends that in the event of large outdoor methyl mercaptan spills at night, emergency responders alert people to take protective action within 1.9 miles (3.1 kilometers) downwind of the release [12, p. 297]. Figure 17 shows the area to be protected if this guidance had been followed, which includes Highway 225 and a residential area. If DuPont La Porte had created its own version of a guidebook for release scenarios (including release of methyl mercaptan), actions may have been taken to protect the public. Following the incident, based on the methyl mercaptan storage tank level decrease, the CSB calculated that the methyl mercaptan release rate was closer to 9,000 pounds per hour, much of which was inside the manufacturing building—a rate 900 times greater than the dispersion model input. In an earlier study, DuPont determined that a leak greater than 4,500 pounds per hour (from an outdoor, elevated source) could result in hazardous off-site concentrations (ERPG-3 level) of methyl mercaptan.b According to DuPont’s guide for consequence analysis, concentrations above ERPG-2 require evacuation of the affected area. No evacuation occurred, because DuPont lacked adequate release information to provide to authorities.

a The amount of methyl mercaptan released is based on DuPont’s calculations of how much was released during the incident. b Previously, DuPont had found in a study on a methyl mercaptan storage tank that in the event of a fire, the tank’s relief valves could release about 10,000 pounds per hour of methyl mercaptan to the atmosphere, causing off-site concentrations exceeding the ERPG-3 value. To reduce this release rate, DuPont insulated the methyl mercaptan storage tank to decrease the amount of methyl mercaptan that would exit the relief valves during a fire. DuPont aimed to prevent any methyl mercaptan release rate of greater than 4,500 pounds per hour “to avoid ERPG-3 concentrations.” During the incident, methyl mercaptan released at a rate of 9,000 pounds per hour—double the threshold release rate DuPont specified to avoid ERPG-3 (100 ppm) concentrations.

  Page  54  

La  Porte,  Texas  |  Incident  Date:  November  15,  2014  |  No.  2015-­01-­I-­TX   U.S.  Chemical  Safety  and   Hazard  Investigation  Board   Toxic  Chemical  Release  at  the   DuPont  La  Porte  Chemical  Facility  

Figure  17.    Overhead  Image  of  DuPont  La  Porte  Facility  with  Recommended  Downwind  Protection  Zone  (Shown  in  Yellow)  Based   on  the  2016  Emergency  Response  Guidebook  [12,  p.  297].    Downwind  sections  of  Highway  225  and  residential  areas  were  within   the  area  recommended  for  public  protection  from  a  methyl  mercaptan  chemical  leak.    Source:  Google  Earth,  with  annotations  by   CSB.   GUIDANCE  TO  INDUSTRY   Chemical dispersion modeling can be an effective risk-based emergency response tool, but its results are highly dependent on accurate input data. During an emergency, it can be difficult to obtain an accurate release rate, limiting the validity of resulting models [8, p. 239]. Companies can better protect the public from hazardous chemical exposures by identifying a conservative area where people should take protective action (e.g., sheltering-in-place) in the event of a chemical release, and then scaling back that area only when reliable information becomes available to justify reducing the protection zone. In addition, the data available to emergency responders can be enhanced by fence-line monitoring using fixed or portable monitors (Section 4.8.4). Such monitors can provide real-time data on whether the hazardous chemical is migrating off-site at dangerous concentrations. 4.8.2  PHYSICAL  PROPERTIES  OF  METHYL  MERCAPTAN     The ERT did not alert the local authorities to notify the public of the chemical release because some emergency response personnel believed methyl mercaptan was lighter than air and would not affect the local community. A La Porte facility employee informed the CSB as follows:

  Page  55    

La  Porte,  Texas  |  Incident  Date:  November  15,  2014  |  No.  2015-­01-­I-­TX   U.S.  Chemical  Safety  and   Hazard  Investigation  Board   Toxic  Chemical  Release  at  the   DuPont  La  Porte  Chemical  Facility   The [sheriff’s deputy] asked me, how did I know that [methyl mercaptan] was not affecting anybody in the La Porte area. I said, “I’ll ask that question while I’ve got [an emergency response representative] on the phone.” So, I asked, and that’s when I was told that methyl mercaptan is lighter than air and it dilutes out, and that it would have dissipated, pretty much, by the fence line. Methyl mercaptan, however, is heavier than aira and will tend to stay near ground level. DuPont’s technical standard for methyl mercaptan states that methyl mercaptan “gas is colorless and heavier than air, so that it can spread at ground level.” Also, DuPont’s safety data sheet (SDS)b for methyl mercaptan specifies its vapor density, showing that methyl mercaptan is heavier than air (Figure 18). The CSB could not determine why the emergency response representative communicating this information believed that methyl mercaptan was lighter than air.

Figure  18.    DuPont’s  Safety  Data  Sheet  for  Methyl  Mercaptan.    It  indicates  that  methyl  mercaptan  is  heavier   than  air.    Source:  DuPont.   County emergency responders also had difficulty understanding the chemical properties of methyl mercaptan during the release. A post-incident narrative written by a member of the Harris County Hazardous Materials Response Team states:

a The relative gas density or vapor density of methyl mercaptan is 1.66, meaning it is heavier than air, whose density is 1 [50]. b Beginning in 2012, OSHA’s Hazard Communication Standard (HAZCOM) renamed material safety data sheet (MSDS) to safety data sheet (SDS) [156, pp. 5, 7]. Although referred to in this report as an SDS, the document shown in Figure 16 uses the older MSDS language.

  Page  56  

La  Porte,  Texas  |  Incident  Date:  November  15,  2014  |  No.  2015-­01-­I-­TX   U.S.  Chemical  Safety  and   Hazard  Investigation  Board   Toxic  Chemical  Release  at  the   DuPont  La  Porte  Chemical  Facility   Copies of the Safety Data Sheets were retrieved from the [Channel Industries Mutual Aid] Command Van. The terms “methyl mesh and methyl mash” were used in multiple conversations but there was no data in the SDSs concerning either term. “MeSH” is an industry initialism for methyl mercaptan, which DuPont personnel also use,a but personnel did not adequately communicate the formal chemical name to external emergency response agencies.b GUIDANCE  TO  INDUSTRY   Companies should ensure that all personnel who may assist with technical emergency response functions are trained on and understand the information contained in SDSs. Companies should also consider how to communicate formal chemical names to outside parties, such as emergency responders, by either ensuring that all staff are trained on and familiar with formal chemical names (e.g., methyl mercaptan, rather than MeSH) or by ensuring that SDSs include all alternative substance names, such as shorthand names, initialisms, or abbreviations [13]. 4.8.3  CHEMICAL  SENSOR  DATA   During the release, methyl mercaptan detectors inside and outside of the manufacturing building alarmed on the control panel. DuPont La Porte had designed the outside detectors to alarm on the control panel when they sensed a methyl mercaptan concentration of 25 parts per million (ppm) or greater,c specifically to “provide an early warning for a significant release of [methyl mercaptan] that could have impact off-site.” The three

a “MeSH” is shorthand based upon methyl mercaptan’s chemical formula: CH3SH. “Me” represents the methyl group (CH3) and “SH” represents the mercaptan group (SH)—these initialisms combine to form “MeSH.” b The material safety data sheet in Figure 16 does include the term “MeSH” as a synonym for methyl mercaptan. Emergency responders had access to this sheet; however, they may have been specifically looking for the term “methyl mesh” as a synonym and may not have realized that the listed synonym “MeSH” referred to the same chemical. c The ERPG-2 level for methyl mercaptan is 25 ppm. This level “is the maximum airborne concentration below which nearly all individuals could be exposed for up to one hour without experiencing or developing irreversible or other serious health effects or symptoms which could impair an individual’s ability to take protective action.” Emergency responders use ERPG-1, -2, and -3 concentration data to determine how to protect the public [167].

  Page  57    

La  Porte,  Texas  |  Incident  Date:  November  15,  2014  |  No.  2015-­01-­I-­TX   U.S.  Chemical  Safety  and   Hazard  Investigation  Board   Toxic  Chemical  Release  at  the   DuPont  La  Porte  Chemical  Facility   detectors inside the manufacturing buildinga (Figure 3) were also set to alarm on the control panel when they detected 25 ppm methyl mercaptan and were intended to protect workers from exposure to methyl mercaptan.b The ERT, however, did not use the data from these detectors to identify whether there was a potential for an off- site release.c The CSB found that during the incident, the Board Operator communicated information about the process to emergency response personnel, possibly including readings from these detectors, but these concentration data do not appear to have been considered when determining the potential for dangerous methyl mercaptan concentrations off-site. The loss of the Shift Supervisor (Process Coordinator) appears to have contributed to DuPont La Porte’s not considering these data when assessing the magnitude of the release during the incident. 4.8.4  AIR  MONITORING     DuPont La Porte personnel did not monitor (test) the air for methyl mercaptan along the site’s property line (fence line) during the release. DuPont did not have fixed fence-line detectors, necessitating the assignment of individuals to perform air monitoring manually. The company never performed this critical monitoring along the fence line during the initial release. Harris County personnel performed air monitoring near Texas Highway 225 (Figure 16) at approximately 8:07 am and did not detect methyl mercaptan in the air.d This air monitoring, however, was performed five hours after the release began and two hours after the methyl mercaptan pump was turned off (which significantly slowed the release). This value, therefore, did not accurately represent the off-site methyl mercaptan

a There were three methyl mercaptan detectors located inside the manufacturing building, on the first and fourth floors. The third floor, where the release occurred, did not have any methyl mercaptan detectors. b The 25 ppm alarm set point is 50 times NIOSH’s REL of 0.5 ppm, and more than double OSHA’s ceiling limit of 10 ppm [50]. Therefore, alarming at this detection level could not protect workers from exposure to methyl mercaptan. c Post-incident, the methyl mercaptan detectors were tested and evaluated to determine whether they worked. Not all of the detectors had the correct span of 0 to 50 ppm, and so some of them would not have been able to read up to 50 ppm. Additionally, these detectors are limited to detecting a maximum concentration of 50 ppm. d During the morning of November 15, 2014, the Harris County Pollution Control Services Department and the Houston Bureau of Pollution Control and Prevention investigated odor complaints. There were 10 confirmed odor complaints downwind from the DuPont La Porte facility (see Appendix C: Odor Complaints).

From DuPont’s management of change documentation for installation of methyl mercaptan detectors inside the manufacturing building: “Present Conditions and Description of Proposed Change: Personnel can enter a potentially hazardous location without knowing MeSH [methyl mercaptan] has been released to the environment.”

  Page  58  

La  Porte,  Texas  |  Incident  Date:  November  15,  2014  |  No.  2015-­01-­I-­TX   U.S.  Chemical  Safety  and   Hazard  Investigation  Board   Toxic  Chemical  Release  at  the   DuPont  La  Porte  Chemical  Facility   concentrations during the release. A measurable concentration of methyl mercaptan would have been more likely to be detected when the methyl mercaptan pump was operating. GUIDANCE  TO  INDUSTRY   Monitoring for hazardous gases along the fence line at chemical facilities can help the company, emergency responders, and the public understand the nature and extent of a chemical release. Monitoring for hazardous gases at fence lines can be performed by fixed detectors, which can continually collect and record data, providing early notification of releases outside the property.a When fixed detectors are not available, a person using a portable gas detector may also perform air monitoring. This strategy, however, introduces additional risk because that individual may enter a hazardous or toxic environment. Proper PPE, including respiratory protection, must be worn during manual air monitoring operations. In conditions with an unknown concentration and a potential inhalation hazard, the proper respiratory PPE for personnel, under HAZWOPER, would be positive pressure air-supplying respirators (i.e., SCBAs) until it is determined to be otherwise.b Including air monitoring requirements in company emergency response plans and action checklists can help ensure that fence-line air monitoring is performed during emergencies. Personnel responsible for performing air monitoring should also be preassigned and quickly able to access air monitoring equipment.   EMERGENCY  RESPONSE  CONCLUSIONS   As discussed in this section, there were significant deficiencies in DuPont La Porte’s emergency response to the toxic and flammable methyl mercaptan release. Many of the deficiencies stemmed from a flawed emergency response system, including flawed implementation of the emergency response plan. Solutions to most of these deficiencies are covered in Appendix D: Emergency Response Tables. The CSB encourages companies to review their emergency response systems and related plans to ensure they incorporate the lessons learned from this investigation.

a In 2015, the EPA finalized a rule for refineries to monitor benzene at their fence lines [153, p. 3], [154], 40 C.F.R §§ 60, 63 (2015). In promulgating this rule, the EPA acknowledges the importance of monitoring potential sources of hazardous materials and their impact on the surrounding community [153, pp. 6, 9]. The CSB supported the EPA’s proposal for fence-line monitoring and advocated for an automatic, continuous system providing real-time data for several reasons, including strengthening community planning and preparedness [141, pp. 1-3]. b “Employees engaged in emergency response and exposed to hazardous substances presenting an inhalation hazard or potential inhalation hazard shall wear positive pressure self-contained breathing apparatus while engaged in emergency response, until such time that the individual in charge of the [incident command system] determines through the use of air monitoring that a decreased level of respiratory protection will not result in hazardous exposures to employees” (29 C.F.R. § 1910.120 (q)(3)(iv).

  Page  59    

La  Porte,  Texas  |  Incident  Date:  November  15,  2014  |  No.  2015-­01-­I-­TX   U.S.  Chemical  Safety  and   Hazard  Investigation  Board   Toxic  Chemical  Release  at  the   DuPont  La  Porte  Chemical  Facility   5   DUPONT’S  PROCESS  SAFETY  MANAGEMENT  SYSTEM   DuPont, an American Chemistry Council (ACC) member company and Responsible Care practitioner, experienced three major process safety incidents that the CSB investigated over the course of five years, despite implementing its own corporate process safety management system. These incidents were the 2014 La Porte, Texas, methyl mercaptan release; the 2010 Belle, West Virginia, phosgene release [14];a and the 2010 Buffalo, New York, hot work incident [15].b During the present investigation, the CSB found a large number of significant process safety deficiencies at DuPont La Porte that contributed to the incident (see Interim Recommendations and Section 6) [1]. According to CCPS, process safety management systemsc are “comprehensive sets of policies, procedures, and practices designed to ensure that barriers to episodic incidents are in place, in use, and effective” [16]. A process safety management system will have a variety of programs to address process safety. In addition to process safety, chemical manufacturing facilities typically also have programs to address personal safety. Personal safetyd programs and process safetye programs are distinct, and both are important. DuPont developed its own corporate process safety management system that integrated regulatory requirements and voluntaryf elements. Companies create their own process safety management systems to address regulatory requirements, including those under OSHA’s Process Safety Management (PSM) standard and the EPA’s Risk Management Plan (RMP) rule. Based on the chemicals stored on-site, including methyl mercaptan, DuPont La Porte determined that PSM and RMP applied to the Lannate® process (Sections 5.1.1 and 5.2.1). These federal safety regulations provide a process safety management system framework for companies to use in developing their own programs. In addition to meeting these regulatory requirements, DuPont also voluntarily sought to integrate the Responsible Careg Management System (RCMS) framework into the company’s own management system.

a The CSB investigated three separate incidents that occurred in a 33-hour period at a DuPont facility in Belle, West Virginia. One worker was killed by the release of the highly toxic chemical phosgene [14]. b The CSB investigated a hot work incident in Buffalo, New York, that killed one contractor and seriously injured another [15]. c In general, the term process safety management system is interchangeable with process safety management program. d “Personal safety” incidents affect individual workers, resulting in first aid cases, recordable injuries, lost-time injuries, or fatalities. Typical causes of personal safety incidents include slips, trips, falls, lacerations, and dropped objects. Personal safety programs try to reduce the number of worker injuries from these types of hazards by managing individual behaviors. Common areas that personal safety programs address include personal protective equipment, stop work authority programs, working at heights, hazardous material communications, confined space permitting, lockout/tagout, cranes and heavy lifts, area access controls, and vehicle operation. e “Process safety” incidents, on the other hand, include chemical releases, fires, and explosions. Process safety incidents can result in large-scale destruction to site and community infrastructure and can lead to multiple injuries and fatalities. Process safety programs try to prevent these incidents by identifying and controlling the process hazards. Examples of process safety programs include process hazard analysis, inherently safer design, pressure relief systems, automated safety controls, operating procedures, management of change, audits, emergency response systems, and community involvement programs. f ACC’s Responsible Care Management System is one example of a voluntary process safety management system. Another is CCPS’s Risk Based Process Safety Management System, whose 20 process safety elements are detailed in Guidelines for Risk Based Process Safety [52]. g The chemical industry developed Responsible Care to help guide companies toward safe and responsible operation.

  Page  60  

La  Porte,  Texas  |  Incident  Date:  November  15,  2014  |  No.  2015-­01-­I-­TX   U.S.  Chemical  Safety  and   Hazard  Investigation  Board   Toxic  Chemical  Release  at  the   DuPont  La  Porte  Chemical  Facility   This section addresses DuPont’s requirements under OSHA, the EPA, and ACC that the DuPont La Porte site integrated into its site process safety management system used at the time of the November 15, 2014 incident: •   OSHA’s Process Safety Management Standard (Section 5.1) •   EPA’s Risk Management Plan Rule (Section 5.2) •   ACC’s Responsible Care (Section 5.3) Additionally, this section discusses how DuPont integrated and implemented the frameworks provided by PSM, RMP, and Responsible Care into its own corporate safety management system. Ultimately, this PSM system governed operations at the DuPont La Porte facility at the time of the November 2014 incident (Section 5.4). DuPont La Porte’s ineffective implementation of the PSM standard, the RMP rule, Responsible Care, and DuPont’s corporate process safety management system resulted in numerous process safety deficiencies that led to the incident (Section 6). The incident prompted OSHA and the EPA to investigate the DuPont La Porte site and resulted in each of these agencies’ initiating enforcement actions for alleged violations of federal process safety regulations (Section 5.1.2 and Section 5.2.2). The November 2014 incident also caused both ACC and DuPont to evaluate and make changes to their process safety management systems (Section 5.3.4, Section 5.4.1.3, and Section 6.1).   OSHA   The Occupational Safety and Health Act of 1970 (OSH Act) was enacted “to assure safe and healthful working conditions for working men and women; by authorizing enforcement of the standards developed under the Act; by assisting and encouraging the States in their efforts to assure safe and healthful working conditions; by providing for research, information, education, and training in the field of occupational safety and health; and for other purposes.”a The Act led to the establishment of OSHA on April 28, 1971 [17, p. 16]. OSHA developed the Process Safety Management standard in response to the 1990 Clean Air Act Amendments and multiple safety incidents, such as the 1984 Union Carbide toxic release in Bhopal, India, and the 1989 Phillips Petroleum Company explosions and fires in Pasadena, Texas [18]. 5.1.1  THE  PROCESS  SAFETY  MANAGEMENT  STANDARD   The stated purpose of the PSM standard is to prevent or minimize the consequences of catastrophic releases of toxic, reactive, flammable, or explosive chemicals that may result in toxicity, fire, or explosion hazards.b The standard aims to prevent these releases in locations where employees and others could be exposed to serious

a President Richard M. Nixon signed the Willams-Steiger Occupational Safety and Health Act of 1970 on December 29, 1970 [17, p. 17]. The OSH Act of 1970 (Jan. 1, 2004). b 29 C.F.R. § 1910.119.

  Page  61    

La  Porte,  Texas  |  Incident  Date:  November  15,  2014  |  No.  2015-­01-­I-­TX   U.S.  Chemical  Safety  and   Hazard  Investigation  Board   Toxic  Chemical  Release  at  the   DuPont  La  Porte  Chemical  Facility   hazards resulting from chemicals that pose catastrophic risk when stored in quantities greater than stated thresholds [19]. Through this standard, OSHA strives to bring a systematic approach to addressing the hazards associated with these chemicals by establishing a framework for a process safety management system that integrates technologies, procedures, and management practices [18]. It does so through the PSM standard’s 14 elements,a which formalize bedrock safety principles in the form of regulatory requirements. Some of the requirements include performing a process hazard analysis (PHA), managing changes to a process or equipment, establishing sound operating procedures, ensuring adequate employee training and involvement, maintaining the mechanical integrity of all process equipment, and ensuring a satisfactory level of emergency preparedness in the event of a hazardous chemical release.b 5.1.2  DUPONT  LA  PORTE’S  IMPLEMENTATION  OF  PSM   One of the avenues for the PSM standard to apply to a process is that a facility must store at least the established threshold quantity of what OSHA considers to be a highly hazardous chemical.c Based on the amount of methyl mercaptan stored at the DuPont La Porte facility, DuPont La Porte determined that PSM regulations applied.d Additionally, DuPont La Porte personnel integrated PSM requirements into the site’s process safety management system, including performing periodic PSM compliance audits. DuPont La Porte’s first-party PSM compliance audits,e which were divided over a three-year cycle, took 68 auditor-days to complete between 2012 and 2014.f These audits, however, did not identify or effectively correct long-standing PSM deficiencies in DuPont La Porte’s process safety management system (e.g., deficiencies in performing process hazard analysis and management of change) (for more detail, see Section 6: Process Safety Management Deficiencies). In the 10 years before the November 2014 incident, OSHA conducted one inspection at the DuPont La Porte facility following an oleumg release from the fluoroproducts section of the plant [20] [21]. After the November 2014

a The 14 PSM elements are the following: employee participation, process safety information, process hazard analysis, operating procedures, training, contractor management, pre-startup safety review, mechanical integrity, hot work permits, management of change, incident investigation, emergency planning and response, compliance, and trade secrets. See 29 C.F.R. § 1910.119. b 29 C.F.R. § 1910.119. c The PSM standard applies to “(i) A process which involves a chemical at or above the specified threshold quantities listed in appendix A to this section; (ii) A process which involves a Category 1 flammable gas (as defined in 1910.1200(c)) or a flammable liquid with a flashpoint below 100°F (37.8°C) on-site in one location, in a quantity of 10,000 pounds (4,535.9 kg) or more except for: (A) Hydrocarbon fuels used solely for workplace consumption as a fuel (e.g., propane used for comfort heating, gasoline for vehicle refueling), if such fuels are not a part of a process containing another highly hazardous chemical covered by this standard; (B) Flammable liquids with a flashpoint below 100°F (37.8°C) stored in atmospheric tanks or transferred which are kept below their normal boiling point without benefit of chilling or refrigeration.” The PSM standard does not apply to “(i) Retail facilities; (ii) Oil or gas well drilling or servicing operations; or (iii) Normally unoccupied remote facilities” (29 C.F.R. § 1910.119(a)). d Under the PSM standard, the threshold quantity of methyl mercaptan is 5,000 pounds. 29 C.F.R. § 1910.119 (App. A). e 29 C.F.R. § 1910.119(o). f By dividing the PSM audits into a three-year cycle, the DuPont La Porte site was continually evaluated to see if it met PSM requirements. g Oleum is a dense, corrosive liquid consisting of concentrated sulfuric acid containing excess sulfur trioxide in solution [133].

  Page  62  

La  Porte,  Texas  |  Incident  Date:  November  15,  2014  |  No.  2015-­01-­I-­TX   U.S.  Chemical  Safety  and   Hazard  Investigation  Board   Toxic  Chemical  Release  at  the   DuPont  La  Porte  Chemical  Facility   incident, OSHA investigated DuPont La Porte’s Lannate® facility for potential violations,a including identified PSM deficiencies that contributed to the methyl mercaptan release [22].b OSHA also performed an expanded inspection of the DuPont La Porte site (i.e., evaluated other business units’ compliance) under its National Emphasis Program (NEP) for chemical facilities [22].c Although the PSM standard was intended to be performance-based [23],d, e in some respects it functions primarily as a reactive and activity-basedf regulatory scheme. While OSHA intends for PSM program elements to reduce risk, no explicit requirement appears under the PSM standard to reduce risks or prevent catastrophic accidents. Moreover, OSHA is not responsible for proactively evaluating the effectiveness of controls or safeguards [24, pp. 31-32]. As discussed in the CSB’s investigation report Drilling Rig Explosion and Fire at the Macondo Well, Volume 4, the United States relies on a regulatory framework that can be satisfied by “checking the box” when completing a variety of required safety-related activities, such as a PHA or MOC. Yet mere compliance with those requirements can still fail to improve safety. The safety-related activity may not adequately identify major hazards or control major accident events, in part because the regulatory regime lacks targeted risk-reduction, goal-setting requirements [25, p. 26].g For example, a properly completed MOC can effectively reduce the potential for an accident; however, an ineffective one can satisfy regulatory requirements and still leave a facility with substantial unmitigated risk. Under the OSH Act, it is the employer’s responsibility to “furnish to each of his employees employment and a place of employment which are free from recognized hazards that are causing or are likely to cause death or serious physical harm to his employees” and to “comply with occupational safety and health standards.”h Consequently, it is a company’s responsibility to ensure that its implementation of the PSM standard protects

a Under Section 9 of the OSH Act, OSHA has six months to issue citations after a violation has occurred. b In May 2015, OSHA cited DuPont for 11 alleged safety violations stemming from the incident, including deficiencies in PHAs, operating procedures, equipment, MOCs, process safety information, training, alarm system, preventing toxic exposure, and contractor injury logs [164]. DuPont entered into a formal settlement with OSHA on July 17, 2017 [161]. c On July 9, 2015, OSHA cited DuPont for 8 alleged safety violations from an NEP inspection of the adjacent herbicide and fluoroproducts (hydrofluoric acid) business units at the DuPont La Porte site, including deficiencies in process safety information, process hazard analysis, operating procedures, inspections, and documenting and using recognized and generally accepted good engineering practices [155]. After issuing these citations, OSHA placed DuPont in its Severe Violator Enforcement Program [22]. On July 17, 2017, DuPont entered into a formal settlement agreement with OSHA [157]. d Also referred to as performance-based regulations, such goal-setting regulatory requirements and acceptance criteria are specified, and industry must document that its specific solutions meet the requirements, for example in terms of achieving acceptable risk levels. e Preamble to Process Safety Management of Highly Hazardous Chemicals; Explosives and Blasting Agents. Section III. Summary and Explanation of the Final Rule (February 24, 1992). f Activity-based standards and regulations require the mere completion of an activity and do not focus on the effectiveness of major accident prevention or risk reduction efforts. g The only two PSM elements that include goal-setting attributes are process hazard analysis and mechanical integrity. The PSM standard requires a PHA to “be appropriate to the complexity of the process and [to] identify, evaluate, and control the hazards involved in the process” (29 C.F.R. §1910.119(e)(1)). Additionally, under the heading “Mechanical Integrity,” the PSM standard requires that “the employer shall correct deficiencies in equipment that are outside acceptable limits (defined by the process safety information in paragraph (d) of this section) before further use or in a safe and timely manner when necessary means are taken to assure safe operation” (29 C.F.R. §1910.119(j)(5)). None of the other 12 elements include goal-setting requirements. Another example of a goal-setting system is ALARP (“As Low as Reasonably Practicable”). h 29 U.S.C. § 654 (a) (2010).

  Page  63    

La  Porte,  Texas  |  Incident  Date:  November  15,  2014  |  No.  2015-­01-­I-­TX   U.S.  Chemical  Safety  and   Hazard  Investigation  Board   Toxic  Chemical  Release  at  the   DuPont  La  Porte  Chemical  Facility   workers. OSHA typically investigates whether a company is effectively complying with PSM requirements, such as management of change, after an incident occurs. Some companies may be complying with PSM elements without actually reducing risks to employees, and that situation may not be recognized until after an incident occurs. For PSM elements to be effective in accident prevention, a facility’s implementation must be aimed at risk reduction, and company audits must be substantive, helping companies ensure that their PSM programs are working. 5.1.3  RECENT  DEVELOPMENTS  AFFECTING  THE  PSM  STANDARD   The PSM standard has undergone little reform since its inception in the 1990s. Following the April 2013 explosion and fire at a fertilizer storage and distribution facility in West, Texas, President Obama issued Executive Order 13650, “Improving Chemical Facility Safety and Security.”a The executive order tasked a working group of federal agencies, including OSHA and the EPA, with modernizing policies, regulations, and standards to improve the safety and security of chemical facilities. In addition, the CSB placed “process safety management for the 21st century” on its Drivers of Critical Chemical Safety Change list because additional work is necessary to modernize federal process safety regulations [26].   ENVIRONMENTAL  PROTECTION  AGENCY  

In early 1970, the United States began to experience a new and elevated sense of public concern about the environment, including air, land, and water pollution and protection. President Nixon sent to Congress a plan to consolidate many of the federal government’s environmental responsibilities under one new agency, the Environmental Protection Agency. Reorganizing would permit response to environmental problems in a manner that would exceed the previous capability of government pollution control programs. The EPA was established on December 2, 1970 [27]. 5.2.1  RISK  MANAGEMENT  PLAN  RULE   The EPA’s Risk Management Plan rule constitutes that agency’s efforts aimed at chemical accident prevention through the creation of a process safety management system framework, paralleling OSHA’s PSM standard, discussed in the previous section.b Similar to OSHA’s PSM standard, the RMP rule applies to facilities that the Clean Air Act defines as stationary sources of air pollution, and that use or store specific regulated substances that the EPA has determined to be extremely hazardous in nature. If any of the specified toxic chemicals or flammable substances are present at a facility at or above established threshold quantities listed by the EPA in its regulation, then the RMP rule applies to the chemical process using that substance at that facility.

a Exec. Order No. 13,650, 80 Fed. Reg. 34936 (Aug. 1, 2013). b 40 C.F.R. § 68.

  Page  64  

La  Porte,  Texas  |  Incident  Date:  November  15,  2014  |  No.  2015-­01-­I-­TX   U.S.  Chemical  Safety  and   Hazard  Investigation  Board   Toxic  Chemical  Release  at  the   DuPont  La  Porte  Chemical  Facility   After determining that the RMP rule covers a process, a facility must determine which “prevention program” level (Program 1, 2, or 3) applies to the process, based on the process’s potential impact on the public, by using off-site consequence analyses, accident history, North American Industrial Classification System (NAICS) code classification, and PSM program applicability. Program 3a processes are subject to additional, more stringent requirements than Program 1b and Program 2c processes and must implement elementsd of a prevention program that are based primarily on OSHA’s PSM standard. In addition, the RMP rule requires all facilities to complete a hazard assessment based on analysis of worst-case and alternative (more likely) accident scenarios, and identify off-site consequences, compile a 5-year accident history, and coordinate with local emergency responders. Program 2 and 3 facilities must develop a management system to implement the RMP elements and address emergency response requirements of a responding or nonresponding facility to accidental releases of RMP substances. All of these facilities must submit to the EPA a risk management plan, which is a high-level summary of a facility’s implementation of and conformance with the RMP rule for all covered processes. A facility’s EPA risk management plan summary must include •   an executive summary; •   the registration information of the facility; •   at least one worst-case scenario for regulated toxics and at least one worst-case scenario for flammables; •   the five-year accident history of covered processes; •   information concerning emergency response at the facility; •   at least one alternative release scenario analysis for each regulated toxic substance and at least one alternative release scenario to represent all flammable substances; •   a summary of the prevention program for each Program 2 process; and

a Program 3 is the highest-level management program. Most PSM-covered processes are in Program 3, which requires a rigorous management program with detailed record retention criteria and all PSM program elements. Program 3 processes are either subject to OSHA’s PSM standard under federal or state OSHA programs or classified in one of 10 specified NAICS codes that require placement in Program 3. This designation imposes OSHA’s PSM standard as the prevention program as well as additional hazard assessment, management, and emergency response requirements [152], (40 C.F.R. § 68.12). b Program 1 is the lowest, simplest management program, covering processes that would not affect the public in a worst-case scenario and facilities that have recorded no accidents with specific off-site consequences within the past five years. This designation imposes limited hazard assessment requirements and minimal prevention and emergency response requirements [152], (40 C.F.R. § 68.12). c Program 2 is an intermediate management-level program and covers processes that cannot be designated as Program 1 but are not hazardous enough to be in Program 3. Program 2 imposes streamlined prevention program requirements, as well as additional hazard assessment, management, and emergency response requirements [152], (40 C.F.R. § 68.12). d Elements of RMP, similar to PSM requirements, include the following: process safety information, process hazard analyses, standard operating procedures, training, mechanical integrity, compliance audits, incident investigations, management of change, pre-startup reviews, employee participation, hot work permits, and contractors (40 C.F.R. §§ 68.65–68.87, Program 3 Prevention Program).

  Page  65    

La  Porte,  Texas  |  Incident  Date:  November  15,  2014  |  No.  2015-­01-­I-­TX   U.S.  Chemical  Safety  and   Hazard  Investigation  Board   Toxic  Chemical  Release  at  the   DuPont  La  Porte  Chemical  Facility   •   a summary of the prevention program for each Program 3 process [28, pp. 1-2]. According to the EPA, the risk management plan can provide valuable information by identifying potential impacts of a chemical release, steps taken to prevent that release, and emergency procedures should the release occur, enhancing local first responders’ ability to prepare for and respond to an accident on a covered RMP process by fostering communications about and understanding of the hazards in the event of an emergency situation [29]. 5.2.2  DUPONT  LA  PORTE’S  IMPLEMENTATION  OF  RMP   Based on the amount of methyl mercaptan stored at the DuPont La Porte facility, DuPont La Porte personnel determined that the RMP rule applied to the Lannate® process.a Additionally, DuPont La Porte personnel decided that Program 3 requirements applied to the Lannate® process and integrated Program 3 requirements into its process safety management system. For example, DuPont La Porte personnel conducted first-party compliance audits on its RMP program. These audits, however, were superficial, focusing on information presented in the submitted EPA risk management plan summary and not the substance of the RMP rule requirements. Although completing and submitting the risk management plan summary satisfies a part of the EPA’s regulatory requirement, the EPA typically does not assess the risk management plan’s effectiveness in reducing risk until after an incident. Similar to PSM, a company and its site managers are responsible for making their risk management plan effective.b After the incident, the EPA conducted an inspection of the DuPont La Porte facility and alleged 22 separate violations of the RMP, including failure to develop and implement written operating procedures, failure to adequately implement MOC procedures, failure to implement safe work practices, and mechanical integrity violations. This RMP inspection was the first one conducted at the DuPont La Porte facility. Based on these allegations, on behalf of the EPA, the U.S. Department of Justice filed a complaint on Monday, July 23, 2018, along with a stipulation of settlement with DuPont, in the U.S. District Court for the Southern District of Texas. According to the settlement, DuPont was required to pay $3.1 million in civil penalties without admitting liability. The EPA did not seek corrective actions because the DuPont La Porte facility is no longer manufacturing chemicals [30]. 5.2.3  RECENT  DEVELOPMENTS  AFFECTING  THE  RMP  RULE   As noted above, President Obama’s Executive Order 13650, “Improving Chemical Facility Safety and Security,” created what the order referred to as the Chemical Facility Safety and Security Working Group. The

a Under RMP, the threshold quantity for methyl mercaptan is 10,000 pounds (40 C.F.R. § 68.130, Table 1). DuPont La Porte identified in its RMP a methyl mercaptan scenario that could lead to an off-site impact. b Under the General Duty Clause of the Clean Air Act Amendments of 1990, the owners and operators of facilities that have regulated and other extremely hazardous substances are responsible for ensuring that their chemicals are managed safely (42 U.S.C. § 7412(r)(1)).

  Page  66  

La  Porte,  Texas  |  Incident  Date:  November  15,  2014  |  No.  2015-­01-­I-­TX   U.S.  Chemical  Safety  and   Hazard  Investigation  Board   Toxic  Chemical  Release  at  the   DuPont  La  Porte  Chemical  Facility   working group took on many tasksa required by the executive order, including reviewing chemical hazards covered by RMP and PSM to determine if the RMP or PSM regulatory structures could and should be expanded to address additional regulated substances and types of hazards. In addition, the EPA and the Department of Labor were thereafter required to develop a plan, including a timeline and resource requirements, to implement and enforce any expansion of RMP and PSM in a manner that would address those additional regulated substances and types of hazards.b In response to the executive order, on July 31, 2014, the EPA published a request for information concerning its proposed supplementation of its RMP rule [31]. On March 14, 2016, the EPA published its proposed rule, titled Accidental Release Prevention Requirements: Risk Management Programs Under the Clean Air Act, Section 112(r)(7), for notice and comment [32]. On January 13, 2017, the EPA published a final RMP rule amending 40 C.F.R. § 68 requirements (82 Fed. Reg. 4594). Before the rule took effect, the EPA delayed the implementation of the January 13, 2017 amendments until February 19, 2019, to review three petitions it had received requesting reconsideration of the final rule.c Because PSM and RMP modernization is a priority goal of the CSB (see “Drivers of Critical Chemical Safety Change” [33]), the CSB provided written comments to the EPA on these occasions.d On September 21, 2018, the U.S. Court of Appeals for the D.C. Circuit issued its mandate, making the 2017 RMP Amendments Rule effective [34]. On December 3, 2018, the EPA published a final rule that will incorporate the RMP amendments into the Code of Federal Regulations (40 C.F.R. § 68) [34]. The EPA is also working on an RMP Reconsideration Rule, which proposes rescinding certain amendments, including those related to safer technology and alternative analyses, third-party audits, incident investigations, and information availability [35]. This proposed rule would also modify amendments relating to local emergency coordination, emergency exercises, public meetings, and compliance dates [35].

a For more information, see the Department of Homeland Security’s “Actions to Improve Chemical Facility Safety and Security—A Shared Commitment.” b Exec. Order No. 13,650, 80 Fed. Reg. 34936 (Aug. 1, 2013). c On June 14, 2017, the EPA published a final rule to delay the effective date of the RMP rule amendments until February 19, 2019 (82 Fed. Reg. 27133 (June 14, 2017)). In July 2017, various plaintiffs filed a petition for judicial review of the June 14, 2017 delay rule. On August 17, 2018, the U.S. Court of Appeals for the D.C. Circuit vacated the June 14, 2017 EPA regulation that delayed the effective date of the final RMP Amendments Rule (Air Alliance Houston et al. v. EPA et al., No. 17-1155 (DC Cir. 2018)). d Before the EPA issued its final RMP Amendments Rule on January 13, 2017, the CSB also expressed encouragement to the EPA over the needed improvements contained in its new regulations intended to prevent chemical incidents. The CSB viewed this activity to be a good initial step, since the rule adopted several new requirements to help advance chemical safety and the prevention of accidental releases, including improving communication between facilities and emergency responders, requiring root cause analyses of incidents and near misses, and requiring chemical facilities to consider “inherently safer” chemicals and production processes [143]. That is why, in July 2018, the CSB wrote with great concern to the EPA in response to that agency’s May 30, 2018, proposed rule, which proposed scaling back what had been previously proposed on January 13, 2017 [137]. For more information on the current RMP rule requirements, see “RMP Amendments Compliance Information” from the EPA.

  Page  67    

La  Porte,  Texas  |  Incident  Date:  November  15,  2014  |  No.  2015-­01-­I-­TX   U.S.  Chemical  Safety  and   Hazard  Investigation  Board   Toxic  Chemical  Release  at  the   DuPont  La  Porte  Chemical  Facility     AMERICAN  CHEMISTRY  COUNCIL   The roots of the American Chemistry Council (ACC) go back to the late 1800s and the formation of the Manufacturing Chemists’ Association. In 1978, the association changed its name to Chemical Manufacturers’ Association. Finally, in 2000, the association became the ACC [36]. The ACC’s mission is “to deliver value to our members through advocacy, using best-in-class member engagement, political advocacy, communications, and scientific research” [37]. The ACC is a trade organization in the United States that represents chemical companies [37] and requires its member companies to adhere to its Responsible Care program, a voluntary program developed by the chemical industry to help guide companies toward safe and responsible operation [38]. The design and implementation of this program are independent of government involvement and legislative or regulatory requirements.a According to the ACC, industry-based trade associations and process safety management systems, however, can only supplement government process safety regulations.b Even though DuPont experienced major chemical safety incidents and process safety management deficiencies, it still met its Responsible Care requirements. At the time of the November 15, 2014 incident, DuPont’s process safety management system conformed to the requirements of the Responsible Care Management System (RCMS), a key part of Responsible Care. As part of RCMS, DuPont La Porte’s process safety management system was audited for conformance. Neither first-party nor third-party Responsible Care conformance audits identified, prevented, or mitigated deficiencies in DuPont La Porte’s implementation of its management system (see Section 6). The November 15, 2014 incident at DuPont La Porte played a role in the ACC’s launch of a Process Safety Performance Improvement Task Force, discussed later in this section, endorsed to drive continuous improvement in process safety and occupational safety. This section discusses the history of Responsible Care (Section 5.3.1), the current requirements for Responsible Care (Section 5.3.2), the Responsible Care conformance audits at DuPont La Porte (Section 5.3.3), recent

a Responsible Care is practiced in 65 economies around the world [89]. In some instances, Responsible Care is a requirement of a local trade association, allowing the associations to implement it according to their needs [88, p. 2]. b In the ACC’s public comment to the EPA’s RMP revisions (see Section 5.2.1), it suggested that instead of having new requirements for Safer Technology and Alternatives Analysis, there should be a working group to evaluate leveraging the use of voluntary programs such as Responsible Care to achieve these goals [126, p. 43]. Additionally, the ACC’s Process Safety Code states that the code “is also intended to complement regulatory requirements (e.g., OSHA’s PSM standard and EPA’s RMP standard). Regulatory standards, by necessity, focus on process safety at an individual facility. In contrast, the Process Safety Code addresses issues at a more universal level, such as across a division or corporation, and includes a company commitment to set expectations regarding process safety, define accountability for process safety performance, and allocate adequate resources to achieve performance expectations” [44, p. 1].

  Page  68  

La  Porte,  Texas  |  Incident  Date:  November  15,  2014  |  No.  2015-­01-­I-­TX   U.S.  Chemical  Safety  and   Hazard  Investigation  Board   Toxic  Chemical  Release  at  the   DuPont  La  Porte  Chemical  Facility   developments in Responsible Care (Section 5.3.4), and improvement opportunities for Responsible Care (Section 5.3.5). 5.3.1  HISTORY  OF  RESPONSIBLE  CARE   Prompted by several serious process safety incidents in the 1980s (notably the 1984 Bhopal disaster),a the Canadian Chemical Producers’ Association drafted the original Responsible Care Codes. Member companies were required to adhere to these codes to build public trust by showing that they were committed to “doing the right thing” by operating safely and responsibly [39]. In 1988, the ACCb—a U.S. trade association that currently represents 187 companiesc—adopted Responsible Care and made it a condition of membership [40].d Since its adoption, ACC’s Responsible Care program has evolved through efforts to meet the needs of industry and its members.e For example, in 2003, ACC reshaped its Responsible Care obligations from a series of codes into a management system called RCMS,f which is intended to provide a framework for integrating Responsible Care within a company’s management system. In 2003, ACC also added a third-party audit verification requirement to determine whether member companies are meeting their Responsible Care obligations. ACC made additional changes to the Responsible Care requirements in 2004, 2005, 2008, 2012, 2013, and 2017.g Furthermore, according to the ACC, “the development of the Process Safety Code demonstrates how Responsible Care evolves to maintain and improve effectiveness, as well as responds to industry trends and field learnings.” The ability to make such changes to the Responsible Care program quickly gives the ACC the flexibility to adapt the program as needed areas of improvement are identified from industry trends and field learnings. Regulatory changes, on the other hand, are historically more difficult and time-intensive to implement (see Sections 5.1.1 and 5.2.1).

a On December 3, 1984, a methyl isocyanate release at the Union Carbide insecticide plant in Bhopal, India, resulted in an estimated 3,800 deaths within days, and tens of thousands of injuries. Over a period of years, the release killed tens of thousands of people [148]. b At the time of adoption of Responsible Care, the ACC was known as the Chemical Manufacturers Association. It changed its name to American Chemistry Council in June 2000 [119]. c The ACC represents 140 members, 17 affiliates, and 17 associate companies [170]. d An international trade association, the International Council of Chemical Associations, manages Responsible Care. The requirements, however, vary between member countries [89]. In this section, unless otherwise stated, Responsible Care requisites refer to the ACC’s obligations in the United States. e For example, an explosion occurred at the First Chemical plant in Pascagoula, Mississippi, in 2002. The CSB investigated the incident and found significant differences between what the company asserted in its Responsible Care self-audit report and the actual facility status before the explosion. After the accident, the ACC changed its audit methodology from sole reliance on first-party audits to the use of independent third-party audits [146, p. 59], [87, p. 20]. f The ACC defines a management system as a set of organized policies, procedures, and practices that express a set of commitments around a set of core objectives and values. g The ACC changed the Technical Specification in 2004, 2005, 2008, and 2013 [41, p. 18]. The Guiding Principles were revised in 2008 [40]. The third-party audit requirements were changed in 2017 [92]. The Product Safety Code and Process Safety Code were approved in 2012 and required beginning in 2013 [40], [41, p. 16].

  Page  69    

La  Porte,  Texas  |  Incident  Date:  November  15,  2014  |  No.  2015-­01-­I-­TX   U.S.  Chemical  Safety  and   Hazard  Investigation  Board   Toxic  Chemical  Release  at  the   DuPont  La  Porte  Chemical  Facility   5.3.2  RESPONSIBLE  CARE  REQUIREMENTS   Today’s Responsible Care program has four main program elements:

  1.   Adhering to the Responsible Care Guiding Principles
  2.   Implementing the Responsible Care Product Safety Code, Process Safety Code, and Security Code
  3.   Measuring and publicly reporting performancea
  4.   Applying the Responsible Care Management System to achieve and verify results [38]

According to the ACC, the Guiding Principles serve as the ethical foundation of the Responsible Care program [41, p. 1]; the Technical Specification of the RCMS and the supplemental codes are the portions of the system that have to be audited [42]. DuPont—as a member of the ACC—agreed to implement the latest versions of the Guiding Principles, Technical Specification, Security Code,b Product Safety Code,c and Process Safety Code. Per the ACC, Responsible Care’s 12 Guiding Principles are its foundation [41, p. 1]. ACC member companies endorse and commit to these aspirational objectives, which include the following: •   To design and operate facilities in a safe, secure, and environmentally sound manner •   To instill a culture throughout all levels of the organizations to continually identify, reduce, and manage process safety risks •   To make continual progress toward a goal of no accidents, injuries, or harm to human health and the environment from products and operations, and openly report health, safety, environmental, and security performance [43] The ACC built the RCMS from its Responsible Care principles. The ACC asserts that the RCMS “is an integrated health, safety, security and environmental management system based on the principles of Responsible Care and the Policy-Plan-Do-Check-Act continual improvement cycle” [41, p. 1]. The Responsible Care Technical Specification divides the requirements of the RCMS into five categories: policy and leadership; planning; implementation, operation, and accountability; performance measurement and corrective and preventive action; and management review [41, p. 5]. The requirements stated in the Technical Specification overlap with both PSM and RMP. These requirements incorporate developing a management system that

a The ACC publicly reports specific personal and process safety metrics by company and personal and process safety metrics in aggregate [127]. b According to the ACC, it adopted the Responsible Care Security Code “to further enhance the security of our facilities, our communities, and the essential products we produce” [128]. c According to the ACC, it adopted the Responsible Care Product Safety Code “to drive continuous improvement in chemical product safety as part of the industry’s signature environmental, health, safety, and security management system” [129].

  Page  70  

La  Porte,  Texas  |  Incident  Date:  November  15,  2014  |  No.  2015-­01-­I-­TX   U.S.  Chemical  Safety  and   Hazard  Investigation  Board   Toxic  Chemical  Release  at  the   DuPont  La  Porte  Chemical  Facility   includes employee participation, process safety information, compliance (conformance audits), incident investigation, training, emergency planning and response, MOC, PHA, and contractor management. The ACC expanded its third-party audit requirements by adding codes. The organization states that these codes aim to supplement the Technical Specification of the RCMS [44, p. 1]. In 2012, the ACC published its Responsible Care Process Safety Code of Management Practices [44], requiring member companies to implement it by January 1, 2013 [41, p. 16]. The ACC states that the code sets forth its “collective commitment to a culture of process safety throughout our chemical processing operations, management systems and leadership organizations” [44, p. 1]. Additionally, the code “aims to supplement existing process safety requirements contained within the Responsible Care Management System® … technical specifications, by specifically addressing process safety concepts such as leadership, accountability, and culture in order to drive overall process safety performance improvement” [44, p. 1]. The Process Safety Code breaks down its management practices into seven categories: leadership and culture; accountability; knowledge, expertise, and training; understanding and prioritization of process safety risk; comprehensive process safety management system; information sharing; and monitoring and improving performance [44, pp. 1-3]. This code strengthens and expands obligations stated in the Responsible Care Technical Specification for practitioners to establish a comprehensive process safety management system [44, p. 2].

From Responsible Care’s Process Safety Code of Management Practices:

“Companies will design systems to manage and mitigate identified risks with adequate safeguards. Management of process safety will take into account passive controls; engineering controls; operational controls; inherently safer approaches; inspection, maintenance and mechanical integrity programs; management of change procedures; and scenario planning” [44, p. 2].

  Page  71    

La  Porte,  Texas  |  Incident  Date:  November  15,  2014  |  No.  2015-­01-­I-­TX   U.S.  Chemical  Safety  and   Hazard  Investigation  Board   Toxic  Chemical  Release  at  the   DuPont  La  Porte  Chemical  Facility   5.3.3  RESPONSIBLE  CARE  CONFORMANCE  AUDITS   To verify conformance with the RCMSa and Responsible Care Codes,b ACC member companies must undergo an independent third-party auditc performed by a qualified auditord every three years [41, pp. 4, 16]. This audit evaluates the practicese of the corporation’s headquarters and a sampling of the company’s facilities,f depending on the number of facilities a company has [42, pp. 6-8]. For example, large companies, such as DuPont, which had more than 40 facilities at the time of the 2014 incident, can retain their certification by auditing only eight of their facilities and their headquarters every three years.g The ACC designed the auditing system to allow companies to manage their auditing process, including multiple location visits over their audit cycles. According to the ACC, companies can consider risk and other factors to determine which facilities to submit for third-party audits [42, pp. 7-8]. For example, DuPont’s Responsible Care auditing process began in 2005 and the company planned on completing all of its facility audits by 2019. As seen in DuPont’s plan, it could take more than 14 years before a facility is audited again under Responsible Care, potentially allowing facilities to fall out of certification or to be inconsistent with other company facilities for many years while the company remains certified under Responsible Care. Additionally, Responsible Care’s third-party audit requirements are divided into three groups, depending on the number of facilities a company has. As shown in Figure 19, the more facilities a company has, the smaller the percentage of its facilities that have to be audited during an audit cycle to obtain Responsible Care certification [42, p. 7].

a RCMS is contained in the Technical Specification of the code. This specification is the only portion of RCMS that is required to be audited. Responsible Care has undergone multiple changes including a shift to third-party audits and the addition of a Process Safety Code. The CSB recommended to the ACC in its investigation into an explosion at First Chemical that the ACC “ensure that ACC members understand the audit requirements of Responsible Care and accurately identify and address gaps in facility process safety programs” [146, p. 67]. Beginning in 2004, the ACC shifted from first-party to independent third-party audits for certification of a company’s RCMS program. It also required companies to report their statistics on the Responsible Care website. In 2012, Responsible Care added the Process Safety Code to supplement the Technical Specification, making it auditable as well [40]. b In November 2017, the ACC changed its third-party audit requirements [92, pp. 3-4]. c DuPont used both third-party audits and self-audits (first-party) to demonstrate conformance with Responsible Care. Self-audits are conducted by auditors from the facility being audited, and third-party audits are conducted by auditors from an independent organization [66, pp. 27-28]. d Third-party audits are not done by ACC; they are performed by independent auditing firms accredited by the ANSI-ASQ National Accreditation Board (ANAB). e The portions of Responsible Care that are audited are the Technical Specification and supplemental codes (Process Safety, Security, and Product) [45, p. 10]. f According to the ACC, for purposes of auditing, a facility is defined as a “location falling under an ACC member’s/Responsible Care Partner’s dues calculations at which commercial chemicals are manufactured, handled, transported, [and] stored and where employees or others working on behalf of the ACC member/Responsible Care Partner are present” [42, p. 2]. g The ACC requires that two-thirds of the facilities currently being audited be among those not audited in the previous audit cycle [42, p. 7].

  Page  72  

La  Porte,  Texas  |  Incident  Date:  November  15,  2014  |  No.  2015-­01-­I-­TX   U.S.  Chemical  Safety  and   Hazard  Investigation  Board   Toxic  Chemical  Release  at  the   DuPont  La  Porte  Chemical  Facility  

Figure  19.    Excerpt  from  Responsible  Care’s  Third-­‐party  Audit  Requirements.    It  shows  the  more  facilities  a   company  has,  the  lesser  are  the  audit  requirements  [42,  p.  7].    Source:  ACC.   The ACC acknowledged that the DuPont La Porte site met its Responsible Care requirementsa in 2007, following a third-party audit conducted at the DuPont La Porte facility that certified the facility to be in conformance with the RCMS Technical Specification requirements.b This was the only third-party Responsible Care evaluation ever performed at the DuPont La Porte facility. A third-party evaluator determines only if a facility is meeting the Responsible Care requirements that exist at the time of the third-party audit. Furthermore, a third-party certification does not imply that a facility is meeting its RCMS requirements years later without an additional evaluation of the facility. Additionally, DuPont La Porte personnel performed six self-audits between 2007 and the date of the incident.c None of these audits, however, identified or effectively corrected the many serious and long-standing process safety deficiencies at the site. These process safety deficiencies were discussed in the CSB Interim Recommendations for this incident and are also described in this report in Section 6 [1].

a At the time of the 2007 audit, the Product Safety and Process Safety codes were not in place and the Guiding Principles were located in the Technical Specification. b According to the ACC, conformance means meeting code implementation and reporting deadlines; completion of required RCMS third- party certification in three-year cycles; and annual reporting of performance results, including process safety incident data. c The DuPont La Porte facility did include in its first-party audit the new requirements for Responsible Care.

  Page  73    

La  Porte,  Texas  |  Incident  Date:  November  15,  2014  |  No.  2015-­01-­I-­TX   U.S.  Chemical  Safety  and   Hazard  Investigation  Board   Toxic  Chemical  Release  at  the   DuPont  La  Porte  Chemical  Facility   Although Responsible Care requires robust process safety programs at its member facilities, the CSB found that the RCMS on its own is not sufficient to ensure that a particular facility’s safety programs are effective.a For example, the quality of an audit or assessment can be affected by the amount of information it evaluates. An average Responsible Care third-party audit that evaluates a facility’s management system lasts three to five days [45, p. 6],b a relatively short amount of time to analyze significant and complex matters, which could potentially limit the scope and depth of any audit. The ACC’s expectation is that a company’s internal audit process be more detailed than the Responsible Care external audit. For example, a DuPont La Porte environmental, health, and safety manager stated that the facility’s Responsible Care audits were not as detailed as the audits the company performed to verify compliance under OSHA’s PSM standard.c DuPont La Porte’s 2007 third-party audit, which covered about 800 employees and contractors and three business units, took 12 auditor-days.d On the other hand, DuPont La Porte’s first-party PSM compliance audits,e which were divided over a three-year cycle, took 68 auditor-days to complete between 2012 and 2014.f Despite taking more than five times the auditor-days of the Responsible Care audit, the PSM compliance audit requirements were not sufficientg to identify and resolve process safety management deficiencies that contributed to the November 2014 incident (see Section 6). The ACC believes that Responsible Care audits verify that a robust, effective management system is in place [46]. The ACC further believes its auditable Process Safety Code “differs from regulatory standards that, by necessity, focus on process safety at an individual facility. The Process Safety Code is more universal—it addresses issues across a division or corporation, and includes a company commitment to set process safety expectations, define accountability for process safety performance and allocate adequate resources to achieve performance expectations” [47]. Understanding the health of an organization’s process safety management system, however, requires a comprehensive assessment of the content and implementation of its programs.

a The ACC has stated to the CSB, “RCMS is not intended to be a company’s sole safety program. RCMS is one component of the Responsible Care program.… Responsible Care is intended to complement regulatory requirements, a company’s safety processes, and other initiatives—not replace them.” Moreover, the 2004 RCMS Technical Specification states, “the RCMS is also designed to incorporate individual company processes for maintaining regulatory compliance and implementing other company programs and commitments such as sustainable development initiatives.” b According to a 2015 ACC document, the usual cost for a third-party conformance audit ranges from $6,000 to $10,000. The audit typically costs $2,000 per audit day (travel plus auditor time). The CSB calculated the three to five days for audits based on these numbers [45, p. 6]. See American Chemistry Council and National Association of Chemical Distributors, A Comparison of ACC Responsible Care® and NACD Responsible Distribution® Initiatives. c OSHA requires PSM audits to be performed at least every three years at all facilities covered by the standard (29 C.F.R. § 1910.119(o)). d Two auditors worked six days to complete the audit. e 29 C.F.R. § 1910.119(o). f Through the division of the PSM audits into a three-year cycle, the DuPont La Porte site was continually evaluated to see if it met PSM requirements. g In past investigations, the CSB has identified areas of PSM that could be improved upon. “Modernization of U.S. Process Safety Management Systems,” previously on the CSB’s Drivers of Critical Chemical Safety Change List, was renamed in 2018 to “Process Safety Management for the 21st century” and remains on the list [26].

  Page  74  

La  Porte,  Texas  |  Incident  Date:  November  15,  2014  |  No.  2015-­01-­I-­TX   U.S.  Chemical  Safety  and   Hazard  Investigation  Board   Toxic  Chemical  Release  at  the   DuPont  La  Porte  Chemical  Facility   Although the ACC can remove membership from companies not satisfactorily conforming to the Responsible Care program,a one of the program’s objectives “is to keep as many companies actively implementing the program and striving to continuously improve their performance as possible” [48, p. 1]. This objective is contained in its Guiding Principles: To make continual progress toward a goal of no accidents, injuries or harm to human health and the environment from products and operations and openly report health, safety, environmental and security performance [43]. DuPont was meeting its Responsible Care requirements, as demonstrated by its audits, even though it continued to have major process safety incidents across the company.b The ACC informed the CSB that the November 2014 incident at the DuPont La Porte facility, however, “played a role in the launch of an ACC Process Safety Performance Improvement Task Force.” 5.3.4  RECENT  DEVELOPMENTS  IN  RESPONSIBLE  CARE   As noted in the previous section, the November 15, 2014 incident played a role in launching the ACC Process Safety Performance Improvement Task Force. The ACC Board’s Responsible Care Committeec proposed the task force, and it was endorsed by the ACC in November 2015 to drive continuous improvement by industry in process safety and occupational safety. In June 2016, the ACC Board approved the task force’s recommendations, including the following: •   Establishment of new incident information and practice sharing forums •   Formation of regional support networks •   Enhanced collaboration with professional societies •   Enriched data analytics and modified responsible metrics reporting •   Continuous improvement Since the adoption of these recommendations, the ACC has begun implementing several of them. According to the ACC, starting in 2016, its Process Safety Committee has held annual process safety forums for ACC members to “share process safety information, lessons learned, and exemplary practices.” Additionally, the ACC developed a regional network model for sharing noncompetitive process safety knowledge and solutions between site process safety practitioners. Specifically, the ACC established regional networks in Houston and

a In the last 10 years, the ACC has removed six companies from its membership due to their failure to meet their Responsible Care requirements, and in other instances, companies opted to resign voluntarily from Responsible Care prior to potential removal. b The three major investigations were CSB DuPont La Porte Interim Recommendations [1]; E.I. DuPont de Nemours & Co., Inc., Belle, West Virginia: Methyl Chloride Release, Oleum Release, Phosgene Release [121]; E.I. DuPont de Nemours & Co Inc. Buffalo, New York Flammable Vapor Explosion [122]. c The Board Responsible Care Committee is composed of ACC member CEOs or presidents [45, p. 22].

  Page  75    

La  Porte,  Texas  |  Incident  Date:  November  15,  2014  |  No.  2015-­01-­I-­TX   U.S.  Chemical  Safety  and   Hazard  Investigation  Board   Toxic  Chemical  Release  at  the   DuPont  La  Porte  Chemical  Facility   Philadelphia and is developing three additional networks. Another development within the Responsible Care program is the ACC’s adoption of American Petroleum Institute (API) Recommended Practice 754—Process Safety Indicators for the Refining and Petrochemical Industries [49].a The ACC assessed some of its 2017 data and publicly reported its high-level findings in 2018.b 5.3.5  RESPONSIBLE  CARE  IMPROVEMENT  OPPORTUNITIES   In light of the multiple DuPont incidents, the CSB encourages the ACC to evaluate Responsible Care and the RCMS for additional improvement opportunities, with the goals of helping member companies identify and correct process safety deficiencies, and preventing major chemical incidents at member company facilities.c An example of an opportunity for Responsible Care to strengthen its verification systems is including the aspirational Guiding Principles in its third-party verification audits. For example, a Responsible Care auditor could delve deeper than the management system and evaluate buildings that contain process equipment, given that one of the Responsible Care Guiding Principles is “to design and operate facilities in a safe, secure, and environmentally sound manner” [43].d As demonstrated by the facts of this incident, the Lannate® manufacturing building had design deficiencies. The portion of the manufacturing building where the incident took place did not have a stated design purpose—the building was not designed for the process, and the process

a API 754 covers leading and lagging process safety indicators. According to API 754,  “The purpose of process safety indicators is to identify events or conditions that could ultimately lead to higher-level consequences. Indicators provide a means to measure activity, status, or performance against requirements and goals. Monitoring and analyzing performance enables Companies to take corrective action as needed. Properly defined and understood indicators can give Companies confidence that the right things are being managed and tracked” [49, p. 23]. API further explains, “Leading indicators tend to be forward-looking and indicate the performance of the key work processes, operating discipline, or protective barriers that prevent incidents. They are designed to give an indication of potential problems or deterioration in key safety systems early enough that corrective actions may be taken” [49, p. 24]. Conversely, API 754 elaborates, “Lagging indicators tend to be outcome-oriented and retrospective; they describe events that have already occurred and may indicate potential recurring problems [that] may include fires, releases, and explosions” [49, p. 23]. In reliance on the now-familiar four- tier pyramid diagram first introduced by H. W. Heinrich in 1931 as a representation of his study of accident data gleaned from the insurance industry, API 754 breaks down indicators across four tiers. From top to bottom, indicators progress from lagging (Tier 1) to leading (Tier 4) [49, pp. 11-12]. The ACC has adopted API 754 to the Tier 2 level—a loss of primary containment but of lesser consequence than a Tier 1 incident (e.g., no casualties, property damage less than $2,000, on a release of less than a predefined reportable quantity of a process chemical) [145, p. 153]. The ACC has required mandatory reporting under API 754 beginning in calendar year 2018 for 2017. The CSB has discussed API 754 in its Macondo (Volume 3) and Williams investigations. Additionally, as part of the Macondo investigation, the CSB held a public hearing on process safety indicators. The CSB has also looked toward CCPS on approaches to leading and lagging indicators in its Guidelines for Process Safety Metrics. b The ACC reported Tier 1 findings and is still in the process of reviewing Tier 2 events [104]. For more information, see Responsible Care Process Safety. c As a result of its First Chemical investigation, the CSB previously made a recommendation to the ACC to evaluate its audit program: “Ensure that ACC members understand the audit requirements of Responsible Care and accurately identify and address gaps in facility process safety programs” (2003-01-I-MS-R11), [146, p. 67]. d At the time of the 2007 third-party RCMS conformance audit, the Responsible Care Guiding Principles were different and were included in the RCMS Technical Specification. The principle at the time of the audit that most closely relates is “To operate our facilities in a manner that protects the environment and the health and safety of our employees and the public.”

  Page  76  

La  Porte,  Texas  |  Incident  Date:  November  15,  2014  |  No.  2015-­01-­I-­TX   U.S.  Chemical  Safety  and   Hazard  Investigation  Board   Toxic  Chemical  Release  at  the   DuPont  La  Porte  Chemical  Facility   equipment did not need to be inside a fully enclosed manufacturing building.a Yet even without a process requirement to do so, DuPont accepted significant process risk by housing process equipment inside the enclosed building, making personnel vulnerable to highly toxic chemical exposure and asphyxiation hazards that DuPont had not effectively identified or controlled. The manufacturing building was not designed to limit the impact of a toxic chemical leak by containing the leak and routing it to a destruction device, such as an incinerator or scrubber. The manufacturing building trapped vapors from highly toxic chemical leaks and concentrated them inside the building, increasing risk to workers [1, p. 3]. Furthermore, this design did not eliminate the hazards associated with a release to the community or environment, which an effectively designed containment buildingb could have done. Since the manufacturing building’s ventilation fans (if functional) routed any toxic chemicals within the manufacturing building to the roof, discharging them directly to the atmosphere without an additional destruction device, they did not decrease the potential for a hazardous off-site release [1, p. 33]. In this case, a robust assessment of the process’s location inside the manufacturing building could have identified the hazards presented. To achieve the ACC’s aspirational objectives, such as “design[ing] and operat[ing] facilities in a safe, secure and environmentally sound manner” [43], Responsible Care auditors should look for deficiencies inconsistent with Responsible Care’s Guiding Principles. When the ACC developed the original RCMS Technical Specification in 2003, it fully incorporated the entire aspirational Guiding Principles into the specification. The ACC informed the CSB that adding the Guiding Principles as an element into its RCMS Technical Specification proved challenging for auditors and those audited, since the Guiding Principles overlapped with requirements found in other sections of the Technical Specification or within a company’s existing procedures, creating confusion as to whether separate, additional actions were necessary to show conformance with this element. In 2008, the ACC replaced the listing of the Guiding Principles within the RCMS Technical Specification with what it believed was a streamlined set of auditable requirements intended to reflect the key objectives of the Guiding Principles. The ACC stated that based on its experience, it believes the change it adopted in 2008 is the most effective way to address the key objectives of the Responsible Care Guiding Principles. Another opportunity for Responsible Care to improve its verification program is to evaluate whether the company’s process safety management system is functioning as the company intends. For example, Responsible Care requires companies to establish and maintain systems to “protect the environment, conserve resources, protect worker health and create a safe and secure work environment” and to “establish and maintain procedures to respond to accidents and emergency situations, and for preventing and/or mitigating the impacts that may be associated with them” [41, pp. 8-9]. The CSB identified that the DuPont La Porte Responsible Care

a The packaging area of the building on the ground floor (west side) may have had a legitimate need to be inside a building. Dust control and keeping the packaging equipment and methomyl product dry appeared to be important considerations that may have justified keeping packaging area equipment housed inside a building [1, p. 32]. b A containment building is an enclosure around process equipment to contain potential releases to the environment. Companies typically use containment buildings to reduce off-site risk. DuPont La Porte has stated that the manufacturing building was not a containment building [1, p. 3]. According to CCPS, “a containment building provides protection outside the building, but can also trap and concentrate material from small leaks inside the building, increasing the risk to personnel. Provisions must be made to ensure worker protection for a process located in a containment building, such as monitoring the atmosphere in the containment structures, restricting access, and requiring proper personal protective equipment when entry into the containment structure becomes necessary” [109, p. 59].

  Page  77    

La  Porte,  Texas  |  Incident  Date:  November  15,  2014  |  No.  2015-­01-­I-­TX   U.S.  Chemical  Safety  and   Hazard  Investigation  Board   Toxic  Chemical  Release  at  the   DuPont  La  Porte  Chemical  Facility   audits, however, did not evaluate whether the safety programs implemented to protect employees from potentially hazardous environments, such as the toxic methyl mercaptan detectors inside the manufacturing building, met the facility’s stated design purpose. For example, the 2007 La Porte Responsible Care third-party audit identified the existence of the methyl mercaptan detection system but did not evaluate whether this system could effectively protect workers by warning them of potentially toxic environments. It found the detection system to be in conformance simply because it existed. The CSB, on the other hand, found by evaluating DuPont La Porte’s MOC documentation and relevant chemical safety information that the alarm limits did not meet the intent of protecting personnel. Specifically, the methyl mercaptan detectors inside the manufacturing building were set to alarm at 25 parts per million—a value 50 times greater than the NIOSH recommended exposure ceiling limit and more than double OSHA’s ceiling limit [50], [51]. During the November 2014 incident, these methyl mercaptan detectors were alarming; however, the system did not signify an early release of methyl mercaptan (see Section 4.8.3), and the detectors did not warn workers that they were potentially in a life-threatening toxic environment, because the alarms were set above OSHA’s ceiling limit and they were not communicated to personnel. Additionally, Responsible Care audits did not identify the gaps in DuPont’s corporate standard for the Management of Highly Toxic Materials that allowed toxic gas detection systems to be set above OSHA exposure limits. Although the ACC does not make prescriptive requirements for its member companies, it should ensure that safety systems, such as toxic gas detection systems, will protect workers from unsafe conditions by functioning as the company intended. An effective Responsible Care audit can identify these discrepancies and an auditor can issue nonconformances or recommendations (opportunities for improvement) at the end of the audit. The ACC has multiple opportunities to improve Responsible Care, including assessing Responsible Care’s Guiding Principles in conformance audits, ensuring that safety systems effectively control hazards presented, and seeking to add value to the safe operation of member companies where possibilities present themselves. Because Responsible Care is a voluntary program applied by 187 companies in the United States and can readily adapt to change, it has the potential to be a powerful process safety program.a To fulfill Responsible Care’s original mission to build public trust by showing that chemical companies are committed to “doing the right thing” by operating safely and responsibly, and its Guiding Principles “to seek continual improvement in the integrated Responsible Care Management System to address environmental, health, safety and security performance,” the ACC should continue to seek opportunities to strengthen its Responsible Care program [15], [43]. GUIDANCE  TO  INDUSTRY   Although this section focused on Responsible Care, these learnings can apply to any safety management system. Companies can use a variety of programs to manage and evaluate their process safety management systems. Without an adequate focus on the effectiveness of a process safety management system and its corresponding

a The ACC’s Responsible Care program covers multiple aspects of safety, including process safety, security, product safety, environmental protection, and occupational safety.

  Page  78  

La  Porte,  Texas  |  Incident  Date:  November  15,  2014  |  No.  2015-­01-­I-­TX   U.S.  Chemical  Safety  and   Hazard  Investigation  Board   Toxic  Chemical  Release  at  the   DuPont  La  Porte  Chemical  Facility   safety program elements, such as the 20 elements of Risk Based Process Safety [52], implementing the system will likely not be sufficient to prevent major chemical incidents. Chemical companies should conduct comprehensive assessments of their process safety management systems and the accompanying implementation of those systems and safety program elements to understand the overall health of their organizations, including the effectiveness of accident prevention efforts and the resiliency of operations. Companies should assess the implementation of these systems and their associated safety program elements associated with them. Some ways in which a company can ensure effectiveness include these:

  1.   Ensuring that all company sites adhere to core process safety management system elements and stay

current with all updates and changes to that system. Because companies can adapt to process safety learnings quickly, their process safety management systems should ensure that sites are evaluated to ensure consistency with evolving practices to maximize the effectiveness of these safety improvements.

  1.   Investing sufficient time and resources to conduct robust audits. This investment should help ensure

that audits are not rushed and help companies meet the goal of preventing major chemical accidents.

  DUPONT’S  DEVELOPMENT  AND  IMPLEMENTATION   OF  ITS  PROCESS  SAFETY  MANAGEMENT  SYSTEM     DuPont has long been perceived as a safety leadera and has asserted that its history of process safety extends over two centuries, from its gunpowder manufacturing through its present-day production of chemicals [53, p. 114]. Over the course of this time, DuPont’s process safety management system evolved with the emergence of federal regulations, such as the PSM standard and the RMP rule, as well as the decision to engage in Responsible Care. DuPont developed several methods that it uses to manage and integrate its process safety systems, including its proprietary Safety Perception Surveys and Process Safety Management and Risk Model.b Its corporate process safety management system and implementation process involves four steps: (1) building a safety culture, (2) management leadership and commitment, (3) implementing a comprehensive process safety management program, and (4) operational discipline [54, p. 2]. According to DuPont, the effective implementation of these steps will result in a robust process safety management system [55, p. 10]. Consequently, DuPont La Porte used

a As recently as 2013, the DuPont Corporation received the Robert W. Campbell Award from the National Safety Council. According to the National Safety Council, “winners represent organizations that have taken great strides in [environmental health and safety] excellence. Award winners are acknowledged not only as leaders in the business realm, but also as those that recognize the value of protecting employees and their environment” [115].   b According to DuPont, there was a demand from other companies for DuPont to share its learnings and safety practices. In 1968, it established DuPont Sustainable Solutions, the branch of DuPont (now DowDuPont) that sells the company’s safety systems [113], [114]. DowDuPont’s Specialty Products division announced it will divest its DuPont Sustainable Solutions to create a new, independent global operations management consulting firm. The transaction is expected to close in July 2019 pending the completion of all closing conditions [135].

  Page  79    

La  Porte,  Texas  |  Incident  Date:  November  15,  2014  |  No.  2015-­01-­I-­TX   U.S.  Chemical  Safety  and   Hazard  Investigation  Board   Toxic  Chemical  Release  at  the   DuPont  La  Porte  Chemical  Facility   both the Safety Perception Surveys and the Process Safety Management and Risk Model in implementing its process safety management system. Despite having robust written process safety management programs (i.e., MOC and PHA), over the course of five years, DuPont had major process safety incidents—including those at its Belle, West Virginia; Buffalo, New York; and La Porte, Texas sites, each of which resulted in fatalities. The CSB found that DuPont La Porte’s ineffective implementation of its integrated process safety management system contributed to the severity of the highly toxic material release in the manufacturing building at La Porte. DuPont’s corporate process safety management standard lists four key steps for the implementation and sustainability of an effective process safety management program:

  1.   Establishing an effective and sustainable unified safety culture (addressed in Section 5.4.1 below)
  2.   Providing management leadership and commitment (Section 5.4.2)
  3.   Implementing a comprehensive process safety management program, including organizational learning

and continuous improvement to integrate new risk management knowledge, learnings, and practices into existing site and corporate systems (Section 5.4.2)

  1.   Achieving operational excellence through operational discipline (Section 5.4.2)

This section breaks down these steps into two parts: (1) Building a Safety Culture (step one); and (2) Using the Process Safety Management and Risk Model (steps two through four). According to DuPont Sustainable Solutions’ “Quick 4-Step Review of Process Safety Management,”

“A strong safety culture, based on a commitment to core values on safety, health, and environmental issues, and as evidenced by organizational policies, goals, metrics, and day-to-day decision-making, supports establishing safety systems where safety priorities are recognized, not as conflicting with other priorities, but rather as inherently necessary for completing any task the right way” [54].

  Page  80  

La  Porte,  Texas  |  Incident  Date:  November  15,  2014  |  No.  2015-­01-­I-­TX   U.S.  Chemical  Safety  and   Hazard  Investigation  Board   Toxic  Chemical  Release  at  the   DuPont  La  Porte  Chemical  Facility   5.4.1  BUILDING  A  SAFETY  CULTURE   DuPont’s corporate process safety management standard states that process safety culturea “determines the manner by which PSM is implemented and managed at each site as part of both individual and group values and behaviors to enable sound decision making and continuous improvement.” Therefore, DuPont links the effectiveness of process safety management implementation to the process safety culture of a facility. Moreover, previous CSB investigations also support DuPont’s corporate standard that links effective process safety management systems with a strong process safety culture.b According to DuPont, establishing a safety culture is the first step in developing a process safety management system because a system will be only as effective as its safety culture permits. Additionally, DuPont’s corporate process safety management standard recommends periodic site evaluations of process safety culture.c DuPont’s standard further recommends that sites use the results of process safety culture assessments to highlight strengths and develop potential improvement strategies. For more than a decade, DuPont developed and honed a safety culture program to reduce its OSHA total recordable injury rate by assessing and improving occupational (personal) safety, using its Bradley Curve and Safety Perception Survey tools (Appendix E). These tools, however, focus on only one aspect of safety culture—personal safety. DuPont La Porte used the Safety Perception Survey without doing a process safety culture assessment as recommended in the corporate process safety management standard. Because this survey did not formally assess process safety culture perceptions, DuPont La Porte never evaluated its process safety culture. Had its efforts included a focus on perceptions of process safety as well as personal safety in its Safety Perception

a Examples of a process safety culture from DuPont’s corporate standard include maintaining a sense of vulnerability in terms of process safety management risks to prevent complacency or overconfidence, and transparent, timely, and thorough responses to PSM concerns, action items, and issues, including leadership measures to prevent a “check-the-box” mentality (i.e., simply accomplishing a task as the objective rather than ensuring a high degree of focus on risk management and prevention). b Among other investigations, the CSB investigation of the Williams Geismar Olefins Plant Reboiler Rupture and Fire demonstrates the CSB’s position that to prevent process incidents, organizations must develop a culture that promotes effective process safety management systems [71, p. 52]. c DuPont’s corporate process safety management standard does not specifically address how its sites should perform process safety culture assessments. DuPont’s standard directs sites to include interactions and discussions with employees, review results of audits, and observe physical conditions of the site in performing process safety culture assessments. In Essential Practices for Creating, Strengthening, and Sustaining Process Safety Culture, CCPS states,

“A strong, positive process safety culture enables the facility’s [process safety management system] to perform at its best. This gives the facility its best chance to prevent catastrophic fires, explosions, toxic releases, and major environmental damage” [56, p. 2].

  Page  81    

La  Porte,  Texas  |  Incident  Date:  November  15,  2014  |  No.  2015-­01-­I-­TX   U.S.  Chemical  Safety  and   Hazard  Investigation  Board   Toxic  Chemical  Release  at  the   DuPont  La  Porte  Chemical  Facility   Survey, or had it performed a separate process safety culture assessment with the intent of improving process safety culture as recognized in DuPont’s corporate process safety management standard, DuPont La Porte likely would have been more aware of potential process safety issues and better positioned to prevent or mitigate future process safety incidents. CCPS recognizes the importance of a strong process safety culture in preventing major accidents [56, p. 2]. This section discusses the following: •   The investigations into the catastrophic 2005 BP Texas City explosion that emphasized the way in which culture is shaped by the level of focus an organization places on process safety (Section 5.4.1.1) •   The lack of formal process safety culture assessments at DuPont La Porte (Section 5.4.1.2) •   Post-incident initiation of formal process safety culture assessments at DuPont legacy sites to address gaps in process safety culture perceptions in 2017 (Section 5.4.1.3)

  Page  82  

La  Porte,  Texas  |  Incident  Date:  November  15,  2014  |  No.  2015-­01-­I-­TX   U.S.  Chemical  Safety  and   Hazard  Investigation  Board   Toxic  Chemical  Release  at  the   DuPont  La  Porte  Chemical  Facility   5.4.1.1  BP  TEXAS  CITY  INCIDENT   The CSB investigated a 2005 incident at a BP refinery in Texas City, Texas,a and due to concerns about the effectiveness of the safety management systems at this refinery and BP’s other North American refineries, as well as concerns about BP’s corporate safety culture, the CSB issued an urgent safety recommendation to the BP Global Executive Board of Directors to commission an independent panel to conduct a thorough review of BP’s corporate organizational culture, safety management systems, and corporate safety oversight at its U.S. refineries [57, pp. 3-4]. As a result, BP formed the BP U.S. Refineries Independent Safety Review Panel, commonly referred to as the Baker Panel,b which conducted an independent organizational assessment of BP’s culture and its corporate-level oversight of safety management systems at its U.S. refineries [58, pp. viii-ix]. The Baker Panel developed a process safety culture survey and supervised its administration among BP’s U.S. refinery workforce, including employees and contractors [58, p. 7]. The survey contained 65 items related to the process safety culture at participants’ workplaces. The Baker Panel concluded that BP “mistakenly interpreted improving personal [worker] injury rates as an indication of acceptable process safety performance” (Figure 20) [58, p. xii]. The panel also noted, “the presence of an effective personal safety management system does not ensure the presence of an effective process safety management system … [and] BP’s [worker] injury rates were not predictive of process safety performance at BP’s five U.S. refineries” [58, p. 21].

a On March 23, 2005, a series of explosions occurred at the BP Texas City, Texas, refinery during the restarting of a hydrocarbon isomerization unit—killing 15 workers and injuring 180 others. The explosions occurred when a distillation tower flooded with hydrocarbons and was overpressurized, causing a geyser-like release from the vent stack [140]. For more information, see the CSB’s BP America Refinery Explosion investigation. b Former Secretary of State James Baker III chaired the BP U.S. Refineries Independent Safety Review Panel (the Baker Panel) [58, p. viii].

Figure  20.    Excerpt  from  the  Baker  Panel  Report.    The  Baker  Panel  found  that  BP   emphasized  personal  (worker)  safety  performance  and  did  not  adequately  focus  on   process  safety.    Similarly,  12  years  after  this  accident,  DuPont  La  Porte’s  safety  culture   assessments  at  its  site  focused  solely  on  personal  safety  performance.    Source:  Baker   Panel  Report  [58].

  Page  83    

La  Porte,  Texas  |  Incident  Date:  November  15,  2014  |  No.  2015-­01-­I-­TX   U.S.  Chemical  Safety  and   Hazard  Investigation  Board   Toxic  Chemical  Release  at  the   DuPont  La  Porte  Chemical  Facility   After the 2005 BP accident and the published findings of both the Baker Panel and the CSB, much of the chemical process industry began to emphasize the importance of understanding and assessing process safety culture.a A major process safety incident, such as the one at DuPont La Porte, can reveal weaknesses in the management of process safety.b 5.4.1.2  DUPONT  LA  PORTE  DID  NOT  FORMALLY  ASSESS  PROCESS  SAFETY  CULTURE   DuPont La Porte did not use any type of robust, formal process safety culture assessment. Process safety culture can affect whether a site has a sense of vulnerability in terms of process safety management risks; complacency or overconfidence; and transparent, timely, and thorough responses to PSM concerns, action items, and issues, including leadership measures to prevent a “check-the-box” mentality (i.e., simply accomplishing a task as the objective rather than ensuring a high degree of focus on risk management and prevention). The Safety Perception Surveys conducted at the DuPont La Porte facility before the November 2014 incident were designed to lower OSHA total recordable injury rates [59, p. 8]. DuPont did not intend for these surveys to measure or address the perception of process safety performance. As part of DuPont La Porte’s 2012 Safety Perception Survey, comments were collected and organized by job position. Some of these comments, from different levels of the organization, raised safety culture concerns. For example, one hourly worker (operator) stated, Some fi[rs]t line [supervisors]c turn the other way if a worker put[s] production over safety.d A professional employee expressed concerns about PSM initiatives at the site: Some days it seems like the focus is more about creating documentation and reviewing that documentation than on targeting those areas that will have the biggest impact on improved PSM performance. From my perspective, I feel like “real” process safety management has suffered in some respects and that our processes may actually be less safe than they were before the initiatives. Safety concerns were expressed by multiple supervisors in the survey comments: I hate to say it but not all employees put the same value on safety. That includes [wage roll] employees and first line supervisors. DuPont employee actions demonstrate to me that safety rules are suggestions and do not have to be followed.

a In March 2007—two years after the BP Texas City explosion—CCPS published its book Guidelines for Risk Based Process Safety, which featured “process safety culture” as an element in its new Risk Based Process Safety model [91]. b Other CSB investigations that found a weak process safety culture contributing to an incident include Williams Geismar Olefins Plant Reboiler Rupture and Fire [71, p. 52], CSB Macondo Investigation Report, Volume 3 [61, pp. 233-241], and CSB BP Texas City Investigation Report [60, pp. 142-195]. c At DuPont La Porte, first-line supervisors include shift supervisors. d Original comment was written using all capital letters.

  Page  84  

La  Porte,  Texas  |  Incident  Date:  November  15,  2014  |  No.  2015-­01-­I-­TX   U.S.  Chemical  Safety  and   Hazard  Investigation  Board   Toxic  Chemical  Release  at  the   DuPont  La  Porte  Chemical  Facility   DuPont has always been a strong leader in safety principles for the industry that we work in. The [La Porte] plant has a strong leadership for safety yet sometimes the message does not always get across to the employe[es]. Some still feel that production is above safety yet all managers have stated and demonstrated that production is far down the list when it comes to safety. I believe our “passion” for safety has slipped over the past 10 years. I believe this has impacted [our] ability to consistently achieve safety excellence. I interact with safety professionals from many companies in our area and my opinion is that, as a company, we are no longer the safety leader we were once thought of as. Despite concerns about its safety culture expressed by multiple levels of personnel within the organization, DuPont La Porte did not use these comments to take corrective actions that would institute process safety culture change at the DuPont La Porte facility. In 2014, DuPont La Porte hired an organizational consultant to increase production in the Lannate® Unit. Safety concerns resembling the ones from the 2012 Safety Perception Survey were raised again. According to an interview of a front-line supervisor in July 2014, four months before the incident, “…we just are not as good as we think we are.… not in pay, benefits, safety, etc.… We used to sell the safety program. We spend more time on driving incidents down, to keep the number down. We just have to make it look good. Don’t need to report every detail. Long slow slide— may not even notice how far we have fallen. This supervisor also noted in that interview that DuPont La Porte was at its most vulnerable point because younger engineers were most impressed by improved production, and “safety first” was not always the practice. Had DuPont La Porte formally assessed its process safety culture and taken effective corrective actions, cultural weakness that contributed to significant and long-standing process safety program deficiencies, which the CSB determined were causal to the November 15, 2014 incident (listed below), may have been identified, communicated, and addressed. These deficiencies are discussed in further detail in the CSB Interim Recommendations report on the incident [1] and Section 6: •   Poor hazard analysis practices. Site personnel did not perform a hazard analysis on the troubleshooting techniques that they used leading up to the incident. Additionally, the DuPont La Porte site did not adequately analyze hazards associated with the manufacturing building’s ventilation system in PHAs. A PHA on the ventilation system could have evaluated the ability of the fans to handle toxic releases and established more robust management systems to protect workers when a fan was broken [1, pp. 47; 25-26]. •   Poor design of the manufacturing building. DuPont housed the Lannate® process inside a manufacturing building. The building design increased hazards for the workforce by confining toxic chemicals indoors. The building’s ventilation design also did not consider chemical toxicity hazards inside the building [1, p. 33].

  Page  85    

La  Porte,  Texas  |  Incident  Date:  November  15,  2014  |  No.  2015-­01-­I-­TX   U.S.  Chemical  Safety  and   Hazard  Investigation  Board   Toxic  Chemical  Release  at  the   DuPont  La  Porte  Chemical  Facility   •   Failure to maintain safety-critical equipment. Two “PSM critical”a ventilation fans were not operational at the time of the incident [1, pp. 33-35]. DuPont recognized that a ventilation fan breakdown could result in a high-consequence event. Both fans, however, exhibited poor reliability. One fan had been down since June 2014, five months prior to the incident, due to an electrical problem. On October 20, 2014, the other fan was making a noise significant enough that DuPont operators turned it off and wrote an “urgent”b work order to have it repaired [1, p. 20]. Even had the fans worked, they probably would not have prevented a lethal atmosphere inside the building due to the large amount of toxic gas released [1, p. 3]. •   Failure to develop written procedures for operator actions. DuPont La Porte did not establish a formal procedure for draining liquid from the waste gas vent header piping, aside from its line-breaking policy (Section 6.5). In addition, when the DuPont Technical Team met to discuss how to clear the plugging in the piping system, they did not develop a written procedure for the techniques used to clear plugging in equipment, even though the plugging formed where it had never been before [1, p. 25]. •   Lack of hazard recognition. The methyl mercaptan detectors installed in the manufacturing building were not intended for worker safety—the alarms were set to alarm at 25 parts per million (ppm), which was above OSHA’s ceiling limitc of 10 ppm. Operators also normalized smelling methyl mercaptan because of its low odor threshold and perceived lack of negative health impacts at those low concentrations, even though it is a toxic chemical. Although formally trained,d numerous employees lacked a working knowledge of methyl mercaptan’s hazards and did not recognize that the chemical could be both lethal and explosive. As a result, operators often confirmed methyl mercaptan leaks by purposely smelling for the chemical’s odore without understanding the dangers of this practice. Furthermore, this method of leak confirmation is a poor, unsafe, and unreliable practice that could have been replaced by using portable monitors set at appropriate levels [1, pp. 37-39]. Further, as the CSB concluded in its 2005 BP Texas City investigation, personal safety performance is not an effective gauge of process safety performance [60]. Similar to its investigation findings from BP Texas City, the CSB found that DuPont La Porte also focused on personal safety and did not place enough emphasis on its process safety programs. For example, the Safety Perception Surveys used at the DuPont La Porte facility evaluated only the perception of personal safety performance and did not identify process safety weaknesses at the facility. Even though DuPont La Porte was aware of the importance of BP Texas City’s findings, before the

a DuPont assigns the designation of “PSM Critical” to equipment whose failure could result in a high-consequence event [1, p. 34]. b While the timing required to complete an “urgent” work order is not specifically defined, based on CSB’s review of DuPont records and interviews conducted with DuPont employees, it has a practical meaning of two to three days. c The ceiling limit for a substance is the concentration that must never be exceeded under OSHA (29 C.F.R. § 1910.1000(a)(1) (2016)). d DuPont La Porte included a toxic fume release and methyl mercaptan procedures in its emergency response plan. e The DuPont La Porte facility had an emergency response procedure for a methyl mercaptan leak. If a leak was detected, personnel were required to put on an air demand mask and contact a supervisor or the control room to sound a plantwide fume alarm.

  Page  86  

La  Porte,  Texas  |  Incident  Date:  November  15,  2014  |  No.  2015-­01-­I-­TX   U.S.  Chemical  Safety  and   Hazard  Investigation  Board   Toxic  Chemical  Release  at  the   DuPont  La  Porte  Chemical  Facility   incident it continued to use the Safety Perception Survey without conducting additional formal process safety culture assessments that could identify process safety weaknesses. 5.4.1.3  DUPONT’S  INITIATION  OF  PROCESS  SAFETY  CULTURE  ASSESSMENTS     DuPont La Porte’s safety culture assessment program (the Safety Perception Survey) before the November 2014 incident focused on lowering its OSHA total recordable injury rate. Even as the industry concentrated on improving process safety following the 2005 BP Texas City incident, and DuPont’s consultant arm developed process safety questions for the survey, DuPont La Porte lagged and did not incorporate DuPont’s process safety questions into its Safety Perception Survey.a Furthermore, DuPont La Porte did not formally assess aspects of its culture beyond the Safety Perception Survey. In 2017, however, DuPont required each site to assess its process safety culture periodically and added process safety questions to the Safety Perception Surveys.b This shift in incorporating process safety culture questions in its Safety Perception Surveys is important because, as explained in Chapter 6.2 of Volume 3 of the CSB’s Macondo report, the accuracy of a site’s culture assessment may be called into question if all aspects of culture are not considered as part of the assessment [61, pp. 236-238]. Furthermore, DuPont practice has become more aligned with its corporate philosophy that a process safety management program is only as effective as its safety culture. The CSB views the adoption of process safety culture questions in DuPont’s Safety Perception Survey as a positive development. GUIDANCE  TO  INDUSTRY   The CSB has investigated several major incidents caused by weaknesses in process safety culture.c In recent years, process safety culture has been studied as a component of the broader topic of organizational culture, an analytical approach that the CSB first articulated in Volume 3 of its Macondo report [61, pp. 233-41]. Referencing the work of Sonja Haber and Edgar Schein, the CSB explained that organizational culture refers to characteristics of the overall environment, values, and rules that shape employees’ perceptions and attitudes [61, pp. 234-36]. This analytical framework extends to a culture for process safety, as these same varied components work together to determine the importance that an organization places on process safety. A “safety culture” is thus often accurately described as “the way we do things around here,” or “how the organization behaves when no one is watching” [62, pp. 9-10]. The chemical process industry then further defined process safety culture as

a DuPont corporate conducted Safety Perception Surveys at all of its manufacturing sites. It chose not to include process safety perception questions in these surveys. b DuPont changed some of its process safety culture questions and increased the number of questions from 13 to 14. In 2017, DuPont updated its corporate process safety management standard to require each site to evaluate the process safety culture survey results and identify opportunities for improvement. c Other CSB investigations in which a weak process safety culture was found to contribute to the incident include Williams Geismar Olefins Plant Reboiler Rupture and Fire [71, p. 52], CSB Macondo Investigation Report, Volume 3 [61, pp. 233-241], and CSB BP Texas City Investigation Report [60, pp. 142-195].

  Page  87    

La  Porte,  Texas  |  Incident  Date:  November  15,  2014  |  No.  2015-­01-­I-­TX   U.S.  Chemical  Safety  and   Hazard  Investigation  Board   Toxic  Chemical  Release  at  the   DuPont  La  Porte  Chemical  Facility   “the common set of values, behaviors, and norms at all levels in a facility or in the wider organization that affect process safety” [63]. According to CCPS, a sound or positive safety culture is “the pattern of shared written and unwritten attitudes and behavioral norms that positively influence how a facility or company collectively supports the successful execution and improvement of its Process Safety Management System (PSMS) resulting in preventing process safety incidents” [56, p. 6]. Additionally, a company’s espoused commitments and values, its messages from management to its workforce and the public, the quality of its written safety management programs, and the effectiveness of the implementation of those programs in sound operations are all paramount.a In its book Guidelines for Risk Based Process Safety, CCPS identified six themes of process safety culture: •   Maintain a sense of vulnerability •   Combat normalization of deviance •   Establish an imperative for safety •   Perform valid/timely hazard/risk assessments •   Ensure open and frank communications •   Learn and advance the culture [56, p. 23], [52, pp. 39-66] CCPS expanded on these process safety culture themes in Guidelines for Risk Based Process Safety and developed 10 core principles of process safety culture in Essential Practices for Creating, Strengthening, and Sustaining Process Safety Culture [56, p. 23]. To successfully implement the process safety culture principles in Figure 21, the later principles should build upon the earlier principles because each principle depends on the others [56, pp. 24-25].

a CCPS focuses on the quality of programs and the fidelity to those programs as “Conduct of Operations” and “Operational Discipline,” respectively [63].

  Page  88  

La  Porte,  Texas  |  Incident  Date:  November  15,  2014  |  No.  2015-­01-­I-­TX   U.S.  Chemical  Safety  and   Hazard  Investigation  Board   Toxic  Chemical  Release  at  the   DuPont  La  Porte  Chemical  Facility  

Figure  21.    Excerpt  from  “Overview  of  Core  Principles  of  Process  Safety  Culture,”  in  CCPS,  Essential   Practices  for  Creating,  Strengthening,  and  Sustaining  Process  Safety  Culture  [56,  p.  24].    Source:   CCPS.  

One tool to evaluate a facility’s process safety culture is the use of anonymous process safety culture assessments of staff. These assessments have historically been conducted by surveying a site’s employees through multiple-choice questionnaires. Facilities may also use qualitative assessment practices that go beyond simple employee questionnaire surveys. Such process safety culture assessments include personnel interviews, focus group discussions, and detailed document analyses. In qualitative assessments, workers interact with

  Page  89    

La  Porte,  Texas  |  Incident  Date:  November  15,  2014  |  No.  2015-­01-­I-­TX   U.S.  Chemical  Safety  and   Hazard  Investigation  Board   Toxic  Chemical  Release  at  the   DuPont  La  Porte  Chemical  Facility   auditors, “using their own terms and concepts to express their point of view…. Intensive and in-depth information can be obtained using the [workers’] own language” [64]. Guidance published in recent years describes how to conduct process safety culture assessments of chemical process facilities. In 2011, Contra Costa County in California published a guidance document on conducting process safety culture assessments, and CCPS released the second edition of its book Guidelines for Auditing Process Safety Management Systems [65], [66]. Chapter 4 of the CCPS book provides detailed guidance for auditors evaluating an organization’s process safety culture [66]. Additionally, in 2018, CCPS published Essential Practices for Creating, Strengthening, and Sustaining Process Safety Culture, which details how to assess, develop, and sustain a process safety culture in relation to a company’s process safety management system [56].a In developing a process safety culture assessment, companies should follow the findings of the Baker Panel and ensure that improved injury rates are not perceived as an indication of acceptable process safety performance.b Process safety culture assessments are a tool for understanding a company’s overall commitment to process safety. Furthermore, companies can use the assessments’ findings to develop action items for continual improvement efforts. To ensure a strong culture of process safety, companies must address any process safety culture assessment findings not consistent with the core principles of their process safety culture. Leadership plays an important role in ensuring that deficiencies in the process safety culture are addressed. As Andrew Hopkins noted in his article “Why Safety Cultures Don’t Work,” improving an organization’s process safety culture flows from top management commitment and cascades down to managers and employees [67, pp. 1, 3-4]. Hopkins argued that companies with strong leadership will best achieve process safety excellence by establishing systems (including the use of leading indicators) that drive catastrophic accident prevention [48, pp. 1-3]. Such companies are better equipped to avoid or prevent major process safety incidents because, as Hopkins observed, such companies can better “identify the obvious precursors to catastrophe and get serious about eliminating them” [67, pp. 1, 3-4].

a Essential Practices for Creating, Strengthening, and Sustaining Process Safety Culture includes in an appendix that contains a sample process safety culture assessment protocol [56, pp. 343-380]. b The Baker Panel found that BP “mistakenly interpreted improving personal injury rates as an indication of acceptable process safety performance” (see Figure 20).

  Page  90  

La  Porte,  Texas  |  Incident  Date:  November  15,  2014  |  No.  2015-­01-­I-­TX   U.S.  Chemical  Safety  and   Hazard  Investigation  Board   Toxic  Chemical  Release  at  the   DuPont  La  Porte  Chemical  Facility   5.4.2  USING  THE  PROCESS  SAFETY  MANAGEMENT  AND  RISK  MODEL  

DuPont created the Process Safety Management and Risk Model (also called the PSM Wheel) to represent visually how the last three steps (management leadership and commitment, implementing a comprehensive process safety management program, and operational discipline) should interact with each other, using a wheel to show that DuPont’s process safety management system integrates management leadership and commitment with operational discipline (Figure 22) [54, p. 2]. The second step  in implementing DuPont’s process safety management system, management leadership and commitment, is at the center of the PSM Wheel. According to DuPont, it placed this core value at the center because it affects all aspects of a process safety management system, from forming and fostering a safety culture to implementing policies and providing resources for safety-related activities [54, p. 2]. Additionally, “the actions of all levels of management must support and reinforce strong PSM programs and accountability” [54, p. Figure  22.    DuPont’s  Process  Safety  Management  and  Risk  Model  [54,  p.  2].    Source:  DuPont   Sustainable  Solutions.  

  Page  91    

La  Porte,  Texas  |  Incident  Date:  November  15,  2014  |  No.  2015-­01-­I-­TX   U.S.  Chemical  Safety  and   Hazard  Investigation  Board   Toxic  Chemical  Release  at  the   DuPont  La  Porte  Chemical  Facility   2]. DuPont believes that visible top management involvement (i.e., “felt leadership”a) in safety systems, processes, and programs is necessary for their sustainability. In addition, it notes that felt leadership, commitment, and role modeling greatly influence employees’ interest in, understanding of, and value for safety. The third step in establishing DuPont’s process safety management system, Implementing a Comprehensive PSM Program, is in the spokes of the wheel. Each spoke represents one of 14 aspects of DuPont’s corporate process safety management program.b These spokes are divided into three groups: a.   Facilities to handle and manufacture hazardous materials:

  1.  

Management of “subtle changes”

  1.  

Mechanical integrity

  1.  

Pre-startup safety reviews

  1.  

Quality assurance

b.   Technology of the process:

  1.  

Management of technology change

  1.  

Operating procedures and safe practices

  1.  

Process hazards analysis

  1.  

Process safety information

c.   Personnel who operate, maintain, and support the process:

  1.  

Auditing

  1.  

Emergency planning and response

  1.  

Management of personnel change

  1.  

Incident investigation

  1.  

Contractors

  1.  

Training and performance [68, p. 2]

a DuPont defines “felt leadership” as a respect through action for the well-being of people. It is a building block in constructing trust and real-world relationships among employees, customers, shareholders, and communities [116]. CCPS also defined felt leadership in its CCPS Vision 20/20: “Felt leadership means that the executives and other leaders personally involve themselves in process safety activities. Employees know the executives care about process safety because of what they see and feel executives doing, not just by [what] they hear them saying. Felt leadership is leading by passionate example” [56, p. 31]. b Note that DuPont’s PSM Wheel does not include trade secrets and employee participation, which are elements of OSHA’s PSM standard.

  Page  92  

La  Porte,  Texas  |  Incident  Date:  November  15,  2014  |  No.  2015-­01-­I-­TX   U.S.  Chemical  Safety  and   Hazard  Investigation  Board   Toxic  Chemical  Release  at  the   DuPont  La  Porte  Chemical  Facility   The final step, Operational Discipline, is the rim of the PSM Wheel. DuPont defines operational discipline as “the deeply rooted dedication and commitment by every member of an organization to carry out each task, the right way, each time” [54, p. 2]. According to DuPont, operational discipline translates a documented process safety management system into tangible results (see Figure 23). Additionally, DuPont believes that it reflects the strength of an organization’s safety culture in making safety, health, and environmental (also known as SHE) systems effective and in providing observable results for preventing injuries and incidents [69, p. 58]. DuPont management uses the Process Safety Management and Risk Model at its sites, including DuPont La Porte, and sells its process safety management system to other companies.   DUPONT’S  PROCESS  SAFETY  MANAGEMENT  SYSTEM  CONCLUSIONS   DuPont integrated the PSM standard, RMP rule, and Responsible Care into its corporate process safety management system. In addition to other requirements, these frameworks obligate companies to establish a comprehensive corporate process safety management system. As shown in this section, companies need to ensure that there is an adequate focus on the effectiveness of a corporate process safety management system and its corresponding safety program elements. Without sufficient focus, implementing a corporate process safety management system will likely not be enough to prevent major chemical incidents. At the DuPont La Porte facility, an inadequate focus on the effective implementation of the corporate process safety management system resulted in process safety management deficiencies that led to the November 2014 incident. The following section discusses some of the deficiencies in DuPont La Porte’s process safety management system. 6   PROCESS  SAFETY  MANAGEMENT  DEFICIENCIES   As part of its investigation, the CSB evaluated DuPont La Porte’s implementation of its process safety management system at the site (see Appendix A: Causal Analysis). The CSB found that DuPont La Porte had multiple deficiencies in its process safety management program elements that contributed to the incident, Figure  23.    Excerpt  from  DuPont  Presentation  Titled  “Developing  a  Robust  PSM  Framework  at  DuPont.”  This  slide  illustrates  DuPont’s  perception  of  the  characteristics  of  an  effective   operational  discipline  program  that  translates  to  operational  excellence  [118,  p.  11].     Source:  DuPont  Sustainable  Solutions.

  Page  93    

La  Porte,  Texas  |  Incident  Date:  November  15,  2014  |  No.  2015-­01-­I-­TX   U.S.  Chemical  Safety  and   Hazard  Investigation  Board   Toxic  Chemical  Release  at  the   DuPont  La  Porte  Chemical  Facility   including process hazard analysis (PHA), auditing, management of change (MOC), operating procedures, and safe work practices.a This section details some of these process safety management system deficiencies at the DuPont La Porte facility. Section 4 discusses the deficiencies in DuPont La Porte’s emergency response program.b Additionally, the CSB found that DuPont La Porte’s incentive compensation program did not conform to the OSHA guidance that existed at the time of the incident. Even though DuPont and DuPont La Porte had extensive written policies, these policies did not translate into effective implementation of or adequate focus on the effectiveness of its process safety management system at the DuPont La Porte site. The CSB determined that a company’s development of its own process safety management system is critical to prevent major accidents. Companies should ensure that the safety program elements within their process safety management system are effective, fully implemented, and functioning as intended.   PROCESS  HAZARD  ANALYSIS  EVALUATION   DuPont’s internal PHA training documents state, “historically, the most significant failure in PHAs, identified through the investigation of incidents in which a breakdown of the PHA element was found to be a key factor, is the failure to identify the specific sequence of events that led to the accident (e.g., either failed to ask the right What If question or failed to completely develop the hazardous event scenario).” Without identifying the full extent of a potential hazardous event scenario, PHA teams are not likely to develop adequate safeguards to mitigate a hazard. One of the causes of the highly toxic methyl mercaptan release was a lack of safeguards to prevent the methyl mercaptan hydrate from solidifying in the feed piping. In one of the hundred-plus what-if scenarios considered

a Section 4 covers process safety management deficiencies related to emergency response. b The PSM standard requires companies to have either an emergency action plan or an emergency response plan. Although the standard does not detail requirements for an emergency response program, it incorporates by reference regulations that dictate requirements for emergency action plans and emergency response plans (29 C.F.R. § 1910.119(n)). Figure  24.    Where  PHA  is  Located  on  DuPont’s  Process  Safety  Management  and  Risk   Model  (PSM  Wheel)  [54,  p.  2].    Source:  DuPont,  with  annotations  by  CSB.

  Page  94  

La  Porte,  Texas  |  Incident  Date:  November  15,  2014  |  No.  2015-­01-­I-­TX   U.S.  Chemical  Safety  and   Hazard  Investigation  Board   Toxic  Chemical  Release  at  the   DuPont  La  Porte  Chemical  Facility   in the 2011 PHA, the DuPont La Porte PHA team acknowledged the potential for methyl mercaptan hydrate to solidify in the feed piping. The PHA team identified a scenario in which water back-flowing into the methyl mercaptan feed system could cause the formation of methyl mercaptan hydrate (Figure 25). The consequence of this scenario was the hydrate plugging the methyl mercaptan feed piping. The team identified that heating would dissociate the hydrate and unplug the system, but it did not fully develop (evaluate) the potential hazards resulting from the plugging, including hazards caused by dissociating the methyl mercaptan hydrate. The PHA team assessed the plugging as presenting an unlikely, low-severity hazard, assigning it the lowest possible risk ranking.a As a result of this risk ranking, no additional safeguards or further protective actions were required to address this scenario.

Figure  25.    CSB’s  Reproduction  of  the  Hazard  Evaluation  Worksheet  from  the  2011  PHA.    It  that  identified  the  methyl  mercaptan   hydrate  formation  as  a  hazard.    Source:  DuPont,  with  modifications  by  CSB  for  readability.   As discussed earlier, the PHA team did not comprehensively evaluate this scenario. For example, it did not ensure that a procedure or safeguard existed to heat the piping safely. Figure 25 shows that the PHA team identified one existing safeguard for the hydrate plugging scenario—the company’s standard for backflow prevention. This safeguard, however, was inadequate because this standard addresses backflow from a process (MeSNa cooler) to a service or a utility (water supply). Therefore, applying this standard would not have prevented or offered protection from water flowing into the methyl mercaptan feed piping. Hence, the PHA team underestimated the risk, noting, “Ultimately by heating the line externally it will vaporize and return to [methyl mercaptan] and water vapor.” Even though the PHA team identified heating as a means to dissociate the methyl mercaptan hydrate, DuPont La Porte did not identify the need to develop a formal procedure or engineered system to safely heat the line and address the hazard the team had identified. As a result, on November 14, 2014, the DuPont Technical Team had to develop a troubleshooting plan to address the

a DuPont La Porte used a risk matrix that evaluated risk by assessing consequence and frequency. The DuPont La Porte PHA team assigned the lowest-level possible consequence (C-1) and frequency (F-1) to the methyl mercaptan hydrate. This assignation resulted in the methyl mercaptan hydrate having the lowest possible risk (IV), which meant the PHA team did not have to mitigate the hazard. A C- 1 consequence equates to no significant injury or health impact on-site or off-site and no significant environmental impact. As long as the consequence was classified as C-1, the frequency of the event would not have mattered; the PHA still would not have had to mitigate the risk.

  Page  95    

La  Porte,  Texas  |  Incident  Date:  November  15,  2014  |  No.  2015-­01-­I-­TX   U.S.  Chemical  Safety  and   Hazard  Investigation  Board   Toxic  Chemical  Release  at  the   DuPont  La  Porte  Chemical  Facility   hydrate plugging (Section 6.3). This plan was developed without performing any hazard analysis, developing a written procedure, training personnel, or providing sufficient technical resources for the night shift. Although DuPont La Porte’s 2011 PHA of the process identified methyl mercaptan hydrate formation,a the PHA team did not recognize the need to address the potential methyl mercaptan hydrate formation risk by providing additional safeguards, such as heat tracing,b or to develop a written procedure to safely dissociate the hydrate (see Section 6.3). When critically evaluating any PHA scenario following a major accident, it is not uncommon to identify how a PHA team could have recommended additional or more effective safeguards. The difficulty PHA teams face is how to ensure that what is perceived as “good enough” when evaluating a potential hazard scenario will ultimately provide sufficient protection (effective risk mitigation). Had DuPont La Porte installed effective safeguards, such as heat tracing, to maintain the piping contents above 52°F, the facility could have avoided the abnormal situation that led to the deaths of four workers. Following the November 15, 2014 incident, DuPont completed two new baseline PHAs using a more robust PHA methodology for the Insecticide Business Unit. Despite performing PHAs for more than 30 years, DuPont La Porte employees told CSB investigators that the improved approach for conducting PHAs was resulting in hundreds of action items, never previously identified, to control hazards. Difficulties in performing PHAs highlight the importance of having a strong process safety culture foundation to drive site personnel to effectively respond to real-time events with robust process safety management system programs, including MOCs or safe work practices. GUIDANCE  TO  INDUSTRY   PHAs can be subjective and can result in underestimating the risk of potential hazardous event scenarios. Because in PHAs the assignment of event frequencies and consequence severities can make a significant difference in safeguard requirements, companies need to ensure that PHA teams have a robust process and adequate resources in place to fully develop hazard scenarios and assign appropriate initiating event frequencies and consequence severities to them. Additionally, PHA teams need to ensure that the safeguards applied to the hazard scenarios are relevant and effective in controlling the hazards.

a The methyl mercaptan hydrate hazard was also identified in DuPont La Porte’s technical standard (see Section 6.3). b “Heat tracing is used to prevent heat loss from liquids inside process piping in situations where low fluid temperatures could lead to problems such as an unacceptable increase in viscosity, hydrate formation, congealing or solidification, the separation of components, or when water in the line could form corrosive materials” [131, p. 157]. Heat tracing can be either steam or electrical heat applied to the surface of a pipe and covered by insulation [131, p. 158].

  Page  96  

La  Porte,  Texas  |  Incident  Date:  November  15,  2014  |  No.  2015-­01-­I-­TX   U.S.  Chemical  Safety  and   Hazard  Investigation  Board   Toxic  Chemical  Release  at  the   DuPont  La  Porte  Chemical  Facility     IMPLEMENTATION  OF  CORRECTIVE  ACTIONS     According to OSHA’s Process Safety Management Guidelines for Compliance, taking corrective actions is one of the most important parts of an audit and includes identifying deficiencies, planning, following up, and documenting needed corrections [19]. Audits, PHAs, incident investigations, and emergency response drills are among the various PSM program elements that can generate corrective action items. At times, the corrective action program at DuPont La Porte did not appropriately correct gaps identified by site PSM audits (Figure 26). One of DuPont’s process safety metrics was tracking the completion of corrective action items. However, this metric addressed only one aspect of the site’s corrective action program—time needed to close the corrective action. Time to close corrective actions can indicate the priority management gives to completion of corrective action items. DuPont La Porte’s focus on time to complete, however, sometimes resulted in closing action items after developing a plan to correct a deficiency rather than actually correcting it. In Guidelines for Risk Based Process Safety CCPS states, A safety management system can be seriously deficient, yet appear satisfactory by superficial measures—the paperwork appears to be in place and no serious incidents have been recorded. Complacency replaces a sense of vulnerability, and the execution of program tasks becomes perfunctory [52, p. 639]. Similarly, based on its corrective actions metric, the DuPont La Porte facility did not appear to have a large number of process safety management deficiencies—while the CSB’s review of corrective actions at La Porte Figure  26.    Where  Auditing  is  Located  on  DuPont’s  PSM  Wheel  [54,  p.  2].    Source:   DuPont,  with  annotations  by  CSB.

  Page  97    

La  Porte,  Texas  |  Incident  Date:  November  15,  2014  |  No.  2015-­01-­I-­TX   U.S.  Chemical  Safety  and   Hazard  Investigation  Board   Toxic  Chemical  Release  at  the   DuPont  La  Porte  Chemical  Facility   revealed that some corrective actions were closed without addressing the issue identified by the underlying recommendation.a As such, closing out some corrective actions became perfunctory paperwork closures. For example, in 2009, a second-party PSM audit found that the DuPont La Porte site lacked documentation showing the manufacturing building’s ventilation systemb was ever tested to ensure it could effectively distribute fresh air within the building. Based on this finding, the audit recommended that the site set up a program to test the manufacturing building’s ventilation system periodically. The two sides of the manufacturing building were separately ventilated by dilution air exhaust fans located on the roof of the building. The dilution air ventilation system design used roof-mounted fans to pull fresh dilution air into the manufacturing building. Fans drew fresh air into each floor on each side of the building, at floor level, through a mechanical louver system.c When the system operated properly, air would flow from the fresh air louvers, across the process equipment, and up into return ducts on the ceiling along the internal wall to sweep away any flammable or toxic gases.d Exhaust air from each side of each floor moved inside the ceiling-mounted duct toward the north end of the building (Figure 27), where it was collected in a vertical duct header that directed the exhaust air from all of the floors on each side up to the respective (wet or dry end) dilution air exhaust fan on the roof. Exhaust air from the fans discharged directly to atmosphere. The ventilation system was not equipped with any kind of environmental destruction system, such as a scrubber or incinerator, to remove contaminants.

a The CSB found multiple incidents at the DuPont La Porte facility in which corrective actions were closed by sending emails to relevant parties without following up to ensure effective implementation (e.g., coordination with other companies located on-site, deviation from a highly toxic material requirement, etc.). b The stated design objective for the ventilation system is as follows: “The main objectives of industrial ventilation for the LANNATE®/ [agricultural products intermediates] manufacturing building are to: a. control contaminants to acceptable work place exposure levels, e.g., comply with OSHA regulation or Corporate AELs (acceptable exposure limits), and b. prevent fires and explosions.” The actual design calculations, however, do not take toxicity into consideration. In addition, DuPont has not established an AEL for methyl mercaptan [1, p. 33]. c The louver is a set of angled slats or flat strips fixed or hung at regular intervals in a shutter to allow air to pass through [1, p. 13]. d DuPont La Porte records indicate that the manufacturing building ventilation system design code is National Fire Protection Association (NFPA) 497, Recommended Practice for the Classification of Flammable Liquids, Gases, or Vapors and of Hazardous (Classified) Locations for Electrical Installations in Chemical Process Areas. NFPA 497 defines adequate ventilation as that sufficient to ensure that the concentration of flammable gases does not exceed 25 percent of the lower flammability limit (also called the lower explosive limit (LEL)). DuPont’s methyl mercaptan safety data sheet indicates that the LEL for methyl mercaptan is 3.9 percent [1, p. 13].

  Page  98  

La  Porte,  Texas  |  Incident  Date:  November  15,  2014  |  No.  2015-­01-­I-­TX   U.S.  Chemical  Safety  and   Hazard  Investigation  Board   Toxic  Chemical  Release  at  the   DuPont  La  Porte  Chemical  Facility  

Figure  27.    Simplified  Graphical  Representation  of  a  Typical  Floor  of  the  Manufacturing  Building.    It  shows  how  fresh   air  was  pulled  in  from  the  outside  walls,  swept  across  the  floor,  and  entered  the  exhaust  return  air  ducts  on  each   side.    Source:  CSB.   To close the action item generated—to ensure the ventilation system was routinely tested—DuPont La Porte personnel created a program within their computerized maintenance system that periodically generated a work order to conduct dilution air flow testing [1, p. 34]. DuPont La Porte closed the corrective action in March 2010 after creating this program. But the CSB found serious deficiencies in the implementation of this program: •   DuPont La Porte personnel were supposed to schedule the first ventilation system test in November

  1. This test was delayed and did not occur until two years later, in 2012 [1, p. 34]. This delay

occurred in part because personnel closed the corrective action without assigning a specific individual to ensure completion of the ventilation testing. •   On the dry end side of the building, DuPont La Porte personnel measured dilution air flow without analyzing the data or establishing acceptable air flow criteria. Additionally, they never measured the air flow on the wet end side where the November 15, 2014 release occurred. Therefore, DuPont La Porte never verified whether the manufacturing building’s ventilation system could effectively remove flammable or toxic chemical leaks. Had the corrective action met the intent of the PSM audit recommendation, the need for additional safeguards in the manufacturing building (e.g., a better ventilation system, increased chemical detectors, respiratory protection) should have been evaluated. Effective ventilation system testing and analysis should have identified and corrected poorly ventilated areas to reduce worker hazards posed by potential flammable or toxic gas leaks in the manufacturing building.a

a For more information on the ventilation systems, see the Interim Recommendations report (CSB DuPont La Porte Interim Recommendations [1, pp. 12-16]).

  Page  99    

La  Porte,  Texas  |  Incident  Date:  November  15,  2014  |  No.  2015-­01-­I-­TX   U.S.  Chemical  Safety  and   Hazard  Investigation  Board   Toxic  Chemical  Release  at  the   DuPont  La  Porte  Chemical  Facility   At the time of the November 2014 incident, neither the wet end nor the dry end fans were functioning. Had the deficiencies in the DuPont La Porte ventilation system been recognized, access to the manufacturing building should have been restricteda and personnel could have been required to wear SCBAs inside it. Adequate safeguards could have protected workers when the fatal toxic release occurred. Closing corrective action items with only a limited plan to address an audit finding is a poor practice—it can result in the action item’s being implemented ineffectively or not at all. At DuPont La Porte, even though personnel closed as complete the ventilation system testing action item, they never completed the testing to ensure the effectiveness of the ventilation system. GUIDANCE  TO  INDUSTRY   Companies should ensure that their corrective actions meet the intent of their recommendations. One way to make the intention of the recommendation the focus of any follow-up activity is to evaluate the substance of the corrective action in addition to the time it takes to complete the action.   PROCESS  SAFETY  PRACTICES  DURING  TROUBLESHOOTING  OPERATIONS   A robust strategy for troubleshooting is important because if hazards are not identified before starting an activity, workers could be unprepared for dealing with them, like what happened during the November 2014 incident. Troubleshooting implicates multiple PSM elements, including management of change, operating procedures, and safe work practices (Figure 28). Although DuPont La Porte had written policies and procedures for MOCs, operating procedures, and safe work practices, it did not have a strong process safety approach for dealing with troubleshooting operations. During the morning of November 14, 2014, Lannate® Unit engineers and managers (Technical Team) met as a group with the day shift supervisor to discuss the plugging problem in the methyl mercaptan piping and to develop a troubleshooting plan for clearing the piping and restarting both the Lannate® and agricultural products

a The CSB Interim Recommendations report discusses how DuPont La Porte’s emergency procedures called for restricting access to the manufacturing building if a ventilation fan, such as the wet end or dry end fans, is out of service. However, the actual practice for manufacturing building access was no different with a fan out of service than if all the fans were operating [1, p. 35]. Figure  28.    Where  troubleshooting  Could  Fall  on  DuPont’s  PSM  Wheel  [54,  p.   2].    Source:  DuPont,  with  annotations  by  CSB.

  Page  100  

La  Porte,  Texas  |  Incident  Date:  November  15,  2014  |  No.  2015-­01-­I-­TX   U.S.  Chemical  Safety  and   Hazard  Investigation  Board   Toxic  Chemical  Release  at  the   DuPont  La  Porte  Chemical  Facility   intermediates processes [1, p. 23]. In this meeting, the Technical Team identified the likely scenario that water had entered the methyl mercaptan system, developing a solid hydrate. DuPont’s methyl mercaptan technical standard shows the potential formation of a hydrate at low temperatures. The technical standard states that methyl mercaptan “will form a hydrate with water, which is a solid below [40°F [degrees Fahrenheit]] per information provided by a [methyl mercaptan] supplier” [1, p. 23]. Prior to implementing the troubleshooting plan developed by the Technical Team, however, site personnel did not develop written procedures, conduct any type of hazard analysis for abnormal conditions, conduct a job safety analysis, perform an MOC process, or conduct any other type of hazard analysis [1, p. 25]. Several methods can identify potential hazards and prevent or mitigate potential incidents caused by troubleshooting, including development and use of MOC processes, operating procedures, or safe work practices. A robust troubleshooting approach can include the following methods: •   An MOC approach, which should identify and address possible hazards [52, pp. 423-426, 255-256] •   An operating procedure approach, which should incorporate safeguards while methodically working through troubleshooting steps [52, pp. 255-256] •   A safe work practices approach, which should address unexpected process upsets by using work permits (i.e., line-breaking permits) that can address specific troubleshooting hazards [70, p. 393], [52, pp. 285- 298] A combination of these PSM approaches may be prudent depending on the complexity and urgency of the problem. One or more of the noted PSM approaches could have identified the pathway the liquid methyl mercaptan took into the manufacturing building before personnel put hot water on the insulated piping, leading to the November 2014 incident. GUIDANCE  TO  INDUSTRY   Companies should develop an action plan to manage troubleshooting operations. There are multiple approaches a company can take, including addressing troubleshooting hazards in PHAs, operating procedures, MOCs, or work permits.

  Page  101    

La  Porte,  Texas  |  Incident  Date:  November  15,  2014  |  No.  2015-­01-­I-­TX   U.S.  Chemical  Safety  and   Hazard  Investigation  Board   Toxic  Chemical  Release  at  the   DuPont  La  Porte  Chemical  Facility     MOC  PRACTICES   According to OSHA, “contemplated changes to a process must be thoroughly evaluated to fully assess their impact on employee safety and health and to determine needed changes to operating procedures” [18]. Therefore, to prevent safety incidents and ensure worker safety, companies must ensure that the following considerations are addressed in their MOC process prior to the implementation of any change: •   The technical basis for the proposed change •   Impact of the change on employee safety and health •   Modifications to operating procedures •   Necessary time period for the change •   Authorization requirements for the proposed change [18]a As explained in the CSB’s Williams Geismar Olefin Plant Case Study, robust management of change practices are needed to ensure that personnel review hazards for the entire process affected by the change [71, p. 23]. Within DuPont, MOC policies are defined in standards at the corporate level and adopted according to each site’s procedures. The DuPont corporate standard defines three types of MOCs: technology, subtle changes, and personnel (Figure 29). An MOC for technology is defined as “any change in the technology of the process.”b A “subtle change” is defined as “any change within the documented technology that is not a replacement in kind.”c, d MOCs are intended to be completed prior to any implementation of these types of change. DuPont La Porte adopted DuPont’s corporate MOC policies into its own site policies and procedures. The CSB found, however,

a 29 C.F.R. § 1910.119 (l)(2). b According to DuPont, management of change of “subtle changes” includes rerouting a piping system during field modifications or replacement and installation of an automatic valve to replace a manual valve with the same function. c According to DuPont, management of change technology includes managing changes in the design basis for existing equipment, changes in process materials or operating parameters, and process control changes. d In its Belle investigation, the CSB recommended that DuPont “[r]eevaluate and clarify the DuPont corporate MOC policies to ensure that staff can properly identify and use the distinctions between subtle and full changes and train appropriate personnel how to properly apply the distinctions on any changes in the policy.” [144, p. 110]. The CSB closed the recommendation in April 2013 [147]. Figure  29.    Where  MOC  is  Located  on  DuPont’s  PSM  Wheel  [54,  p.  2].    Source:   DuPont,  with  annotations  by  CSB.  

  Page  102  

La  Porte,  Texas  |  Incident  Date:  November  15,  2014  |  No.  2015-­01-­I-­TX   U.S.  Chemical  Safety  and   Hazard  Investigation  Board   Toxic  Chemical  Release  at  the   DuPont  La  Porte  Chemical  Facility   that DuPont La Porte personnel did not use MOCs for changes to equipment or procedures that contributed to the incident. 6.4.1  NO  MOC  FOR  HEATING  PIPING  OR  FOR  NEW  PIPING  ALIGNMENT   To clear the plugging, the Technical Team asked operators to put hot water on the outside of the methyl mercaptan feed piping, under the insulation, to warm the piping and its contents to dissociate the hydrate back to liquid methyl mercaptan and water (Figure 30) [1, p. 23].

Figure  30.    Hot  Water  Hose  Positioned  on  the  Liquid  Methyl  Mercaptan  Feed  Piping.    Hot  water  flowed   between  the  piping  and  the  insulation  to  heat  the  piping  and  dissociate  the  solid  hydrate  that  had  formed   after  water  inadvertently  entered  the  methyl  mercaptan  storage  tank.    Source:  CSB.   At low temperatures (≤ 52°F), water and methyl mercaptan form a solid, ice-like material called methyl mercaptan clathrate hydrate [72]. Temperatures in the Houston area for the 24 hours preceding the incident averaged approximately 40°F and had been consistently below 55°F since Tuesday, November 11, 2014. Although years earlier, DuPont’s methyl mercaptan technical standard and a PHA identified the potential for methyl mercaptan hydrate formation, DuPont did not have safeguards, such as heat tracing, or develop a procedure to dissociate the hydrate safely [1, p. 22]. The Technical Team realized that when methyl mercaptan was heated it would expand and need a safe place to vent to avoid overpressure in the feed piping. To address this concern, DuPont operations personnel opened three valves between the methyl mercaptan feed line and the waste gas vent header—piping intended to remove excess or unwanted vapor from the process and route it to the NRS incinerator for thermal destruction. DuPont La Porte personnel used pressure gauges at those three valves (Figure 31) to determine the location of the

  Page  103    

La  Porte,  Texas  |  Incident  Date:  November  15,  2014  |  No.  2015-­01-­I-­TX   U.S.  Chemical  Safety  and   Hazard  Investigation  Board   Toxic  Chemical  Release  at  the   DuPont  La  Porte  Chemical  Facility   blockage and their progress in clearing it. At the time of the incident, one of these three valves between the methyl mercaptan feed system and the waste gas vent header was fully open, and a second valve was slightly open [1, p. 25].

Figure  31.    Excerpt  from  CSB  Animation.    It  depicts  the  three  locations  where  valves  connected  the  methyl  mercaptan  feed  piping   (blue)  to  the  waste  gas  vent  header  piping  (orange).    Workers  used  the  pressure  gauges  shown  at  these  locations  to  monitor  the   progress  of  clearing  the  hydrate  blockage  inside  the  methyl  mercaptan  feed  piping.    Source:  CSB.   Operations personnel began implementing the plan that the Technical Team had developed by applying hot water under the insulation, on the outside of the liquid methyl mercaptan piping. DuPont La Porte operators started this process at the methyl mercaptan storage tank and the associated methyl mercaptan feed pump piping segments, and then worked their way down the methyl mercaptan feed piping toward the reaction system. Workers used pressure gauges at each of the three block valves between the liquid methyl mercaptan feed piping and the vapor waste gas vent header piping system to determine the success and progress of the work [1, p. 26].

  Page  104  

La  Porte,  Texas  |  Incident  Date:  November  15,  2014  |  No.  2015-­01-­I-­TX   U.S.  Chemical  Safety  and   Hazard  Investigation  Board   Toxic  Chemical  Release  at  the   DuPont  La  Porte  Chemical  Facility  

Figure  32.    Excerpt  from  CSB  Animation.    It  depicts  the  piping  arrangement  that  allowed  liquid  methyl  mercaptan  from  the   feed  line  (blue)  to  flow  into  the  waste  gas  vent  header  piping  (orange).    Source:  CSB.   Using these valves in this way followed the plan developed by the Technical Team. This alignment, however, created a direct path between the liquid methyl mercaptan system and the waste gas vent header (vapor system), as shown in Figure 32, which was not DuPont’s design intent [1, p. 26]. Additionally, applying hot water to the outside of the methyl mercaptan liquid piping system exceeded the heat input design for the thermal expansion relief valve on this system [1, p. 26]. But DuPont La Porte personnel did not perform an MOC before instructing operations personnel to use the hot water to heat the piping, or before creating the piping alignment. DuPont corporate standards, as well as the EPA’s Risk Management Plan (RMP) rule and OSHA’s PSM regulations, require an MOC for these types of process changes [1, p. 25]. Performing an effective MOC before heating the piping with the hot water hose, and before creating the unusual piping alignment, could have identified and controlled the hazards that led to the incident. An MOC should have also triggered the creation of a written troubleshooting procedure. On the day of the incident, the Technical Team did not provide a written procedure to guide operations or to track the progress toward clearing the plugged methyl mercaptan feed piping. A written procedure should communicate the planned approach to multiple shifts and help avoid confusion. Additionally, it should alert personnel to potential hazards, such as the valve alignment that created the pathway for liquid methyl mercaptan to flow into the manufacturing building.

  Page  105    

La  Porte,  Texas  |  Incident  Date:  November  15,  2014  |  No.  2015-­01-­I-­TX   U.S.  Chemical  Safety  and   Hazard  Investigation  Board   Toxic  Chemical  Release  at  the   DuPont  La  Porte  Chemical  Facility   6.4.2  NO  MOC  FOR  NEW  PIPING  ALIGNMENT  TO  NITROGEN  RELIEF  VALVES   During the troubleshooting operations, the nearly identical nitrogen relief systems located at two railcar loading and unloading stations were lined up to the discharge of the methyl mercaptan pumps (Figure 33). The nitrogen relief valves, however, were not designed for this new piping alignment. DuPont La Porte PHAs and relief valve design documents did not consider the possibility of lining up the methyl mercaptan storage tank pumps to these relief valves—as they were at the time of the incident. As a result, liquid methyl mercaptan discharged from a system designed for nitrogen vapor because the methyl mercaptan pump discharge pressure (90 psig)a was higher than the set pressure (80 psig) of these nitrogen relief valves. Pressurized methyl mercaptan from the pump caused the relief valves to open and release the highly toxic and highly flammable methyl mercaptan to the atmosphere [1, p. 46]. No one recognized this serious hazard because DuPont La Porte personnel did not perform an MOC when it changed the piping alignment during troubleshooting operations. An effective MOC should look at the design basis for equipment to determine whether the proposed use is compatible with its design.

a The abbreviation psig stands for pounds per square inch gauge (pressure).

  Page  106  

La  Porte,  Texas  |  Incident  Date:  November  15,  2014  |  No.  2015-­01-­I-­TX   U.S.  Chemical  Safety  and   Hazard  Investigation  Board   Toxic  Chemical  Release  at  the   DuPont  La  Porte  Chemical  Facility  

Figure  33.    Nitrogen  Relief  Valves  at  One  of  the  Two  Methyl  Mercaptan  Railcar  Unloading  Stations.    DuPont  PHAs  and   relief  valve  design  documents  never  considered  the  possibility  of  lining  up  the  methyl  mercaptan  storage  tank  pumps   to  these  relief  valves—as  they  were  at  the  time  of  the  incident.    As  a  result,  liquid  methyl  mercaptan  was  discharged   from  a  system  designed  for  nitrogen  vapor.    Source:  CSB.   6.4.3  NO  MOC  OR  PROCEDURE  FOR  VENT  HEADER  DRAINING  OPERATION   In 2011, DuPont La Porte invested about $20 million in a project to increase production rates and reduce environmental emissions for the Insecticide Business Unit.a The key piece of equipment installed for this project was the nitrogen oxides (NOx) reduced scrubbed incinerator (NRS) shown in Figure 34.b

a Lannate® was a sold-out product, and DuPont routinely looked for opportunities to increase capacity [1, p. 17]. b The NOx (nitrogen oxides) reduced scrubbed (NRS) incinerator system was a vertical thermal oxidizer system for the destruction of organics, halogenated organics, and nitrogen-containing wastes with removal of acid gas from discharge [1, p. 18].

  Page  107    

La  Porte,  Texas  |  Incident  Date:  November  15,  2014  |  No.  2015-­01-­I-­TX   U.S.  Chemical  Safety  and   Hazard  Investigation  Board   Toxic  Chemical  Release  at  the   DuPont  La  Porte  Chemical  Facility  

Figure  34.    NRS  Incinerator.    NRS  was  installed  in  2011  to  reduce  emissions  and  allow   increased  production  at  the  DuPont  La  Porte  facility.    Source:  CSB.   The NRS incinerator destroyed process waste gas streams that vented from equipment throughout the process. One of these waste gas streams contained methyl mercaptan vapor collected in a process vent system, referred to as the waste gas vent header piping. This header originated from various Lannate® and agricultural products intermediates process vessels, from methyl mercaptan railcar unloading facilities, and from the methyl mercaptan storage tank. The waste gas vent header piping provided the path for these waste gas streams to be directed to the NRS incinerator for thermal destruction (combustion) [1, p. 18]. Following the 2011 installation of the NRS incinerator, DuPont experienced frequent high-pressure events in equipment connected to the waste gas vent header piping.a DuPont decided one significant cause of these high-

a The high pressure in the waste gas vent header piping restricted vent sources flowing into the header, causing high-pressure events in process equipment. If left unaddressed, these high-pressure events could result in relief valves’ opening and discharging hazardous chemicals to the atmosphere [1, p. 18].

  Page  108  

La  Porte,  Texas  |  Incident  Date:  November  15,  2014  |  No.  2015-­01-­I-­TX   U.S.  Chemical  Safety  and   Hazard  Investigation  Board   Toxic  Chemical  Release  at  the   DuPont  La  Porte  Chemical  Facility   pressure events was liquid accumulation in the vapor waste gas vent header piping.a DuPont La Porte personnel had designed and installed the waste gas vent header piping to the NRS incinerator in 2011 without sufficient consideration of liquid accumulation. For example, the piping had low points where liquid could accumulate, and with no engineered equipment provided, such as a knock-out drum,b liquids could not be safely removed from the waste gas vent header piping system.c Because some of the process vents contained water vapor, the common belief was that the accumulated liquid consisted primarily of condensed water with small amounts of other process chemicals, including methyl mercaptan. As a result, area management instructed operations personnel to address high-pressure events in the waste gas vent header piping by opening manual drain valves from the waste gas vent header piping to the atmosphere, directing the liquid toward floor drains located within the manufacturing building [1, p. 18]. DuPont La Porte personnel never completed an MOC or established a specific procedure or used safe work practices, such as line-breaking permits, for draining this liquid from the waste gas vent header piping. Rather, area management directed operators to drain the system through written instructions to operations staff in a daily instruction log book [1, p. 18]. Beginning January 14, 2014, and continuing until the incident, the daily instructions directed operators to drain the methyl mercaptan waste gas vent header’s “low point” on the third floor once per shift. After installation of a flexible hose from the waste gas vent header drain valve to the floor, the instructions changed to include directing the liquid through the hose under a running safety shower until the liquid stopped flowing from the hose [1, p. 18]. DuPont La Porte personnel never sampled or analyzed the liquid workers routinely drained from this system [1, p. 18]. Daily instructions before the incident asked the operators to sample the unknown liquid. DuPont La Porte wanted samples of the liquid for a subsequent laboratory analysis to identify its chemical composition because workers reported that the liquid had a strong, noxious odor of sulfur compounds [1, p. 18]. Even though DuPont La Porte was aware that the liquid likely contained more than just water and was unaware of the actual chemical composition [1, p. 18], instructions to workers did not specify that additional precautions—such as wearing additional personal protective equipment (PPE)—were needed when draining the waste gas vent header. Weeks before the November 2014 incident, DuPont La Porte employees started an MOC to reduce liquid buildup by connecting a hose from the waste gas vent header piping to a process vessel, thus eliminating the need to drain the header liquid onto the floor. This MOC recognized that draining the waste gas vent header on the third floor was “not a good practice, since sometimes nitrogen is used to purge the line, which can lead to a

a DuPont personnel believed the likely source of liquid accumulation was condensation from saturated vapor streams that originated in equipment operating above ambient temperatures. As these vapor streams entered the cooler waste gas vent header, liquid could condense and accumulate over time [1, p. 18]. b Knock-out drum is an industry term for a process vessel that provides for separation of vapor and liquid. c The CSB identified three locations in the waste gas vent header piping to the NRS incinerator where liquid could accumulate: (1) inside the manufacturing building, (2) the piping outside the manufacturing building as it passed through the MIC unit, and (3) at detonation arresters just prior to where the waste gas from the waste gas vent header entered the NRS incinerator. Each location was equipped with a drain valve—two locations had atmospheric drains and only one location’s drain was routed to a caustic scrubber [1, p. 18].

  Page  109    

La  Porte,  Texas  |  Incident  Date:  November  15,  2014  |  No.  2015-­01-­I-­TX   U.S.  Chemical  Safety  and   Hazard  Investigation  Board   Toxic  Chemical  Release  at  the   DuPont  La  Porte  Chemical  Facility   nitrogen release inside the building.” Although area management recognized that this draining “was not a good practice” and could lead to a release of nitrogen,a the practice continued. Once personnel recognized the hazardous nature of this practice, the draining should have at least required additional safeguards, such as restricted access and respiratory protection. GUIDANCE  TO  INDUSTRY   Companies should always use MOCs where required by corporate policy or federal process safety regulations. Special attention should be paid to nonroutine or abnormal operations because these may involve issues with safety systems, equipment, procedures, or personnel practices that can create additional hazards, potentially leading to serious safety incidents if there are poor MOC practices. Company MOC reviewers should be thoughtful and comprehensive so that potential dangers can be avoided or mitigated.

  LINE-­‐BREAKING  PRACTICES   Companies should ensure the use of safe work practices,b such as line- breaking permits, to manage nonroutinec processes, such as draining the waste gas vent header piping. Under the PSM standard, a company must develop and implement safe work practices to provide for the control of hazards during work activities, such as lockout/tagout, confined space entry, or opening process equipment or

a As an asphyxiant, nitrogen can displace oxygen, creating a potentially hazardous environment [168, p. 2]. b CCPS defines safe work practices as “an integrated set of policies, procedures, permits, and other systems that are designed to manage risks associated with non-routine activities such as performing hot work, opening process vessels or lines, or entering a confined space” [150]. c CCPS defines a nonroutine activity as any activity that is not fully described in an operating procedure. Additionally, nonroutine does not refer to the frequency of an activity; rather, it refers to whether the activity is part of the normal sequence of converting raw materials to finished materials [52, p. 288].

Figure  35.    Where  Safe  Work  Practices  Are  Located  on  DuPont’s  PSM  Wheel  [54,  p.   2].    Source:  DuPont,  with  annotations  by  CSB.

  Page  110  

La  Porte,  Texas  |  Incident  Date:  November  15,  2014  |  No.  2015-­01-­I-­TX   U.S.  Chemical  Safety  and   Hazard  Investigation  Board   Toxic  Chemical  Release  at  the   DuPont  La  Porte  Chemical  Facility   piping (i.e., line breaking).a According to Guidelines for Risk Based Process Safety, from CCPS, safe work practices help control hazards and manage risks involved with nonroutine activities [52, p. 286]. Managing risks associated with nonroutine processes requires robust systems, thorough training and awareness, sound culture, and diligence [52, p. 293]. CCPS further suggests developing an integrated system for safe work practices, including safe work procedures, permits, checklists, and other written standards 52, pp. 291-92. Any time a valve is opened to the atmosphere, the mechanical integrity of the system is compromised. Under PSM, employers must develop and implement safe work practices to control hazards during line breaking [18].b Figure 36 shows an approach to line and equipment opening (breaking) from a document that was produced under OSHA’s grant program.

Figure  36.    Triangle  Approach  to  Line  and  Equipment  Opening  Permits.    This  slide  is  from  a  training   document  about  OSHA  operating  procedures,  safe  work  practices,  and  training  [73,  p.  27].     Source:  OSHA  website.   Employees at the DuPont La Porte facility understood that there were hazards associated with nonroutine procedures, such as line breaking. DuPont’s corporate standard, which was also DuPont La Porte’s line- breaking procedure, specifically includes opening a valve to the atmosphere in its definition of line breaking,

a 29 C.F.R. § 1910.119 (f)(4). b According to OSHA, line breaking “means the intentional opening of a pipe, line, or duct that is or has been carrying flammable, corrosive, or toxic material, an inert gas, or any fluid at a volume, pressure, or temperature capable of causing injury” 29 C.F.R. § 1926.1202.

  Page  111    

La  Porte,  Texas  |  Incident  Date:  November  15,  2014  |  No.  2015-­01-­I-­TX   U.S.  Chemical  Safety  and   Hazard  Investigation  Board   Toxic  Chemical  Release  at  the   DuPont  La  Porte  Chemical  Facility   which requires a written job plan if it involves a hazardousa process or system.b Personnel at the DuPont La Porte facility, however, did not understand that draining the waste gas vent header through the flexible hose constituted a line break and required a permit. To drain the header using the existing equipment and work instructions, operations personnel had no choice but to open a valve to let the liquid flow toward the floor drain (and thus to the atmosphere), breaking the mechanical integrity of the line. Although area management left written instructions, there was no written job plan and no specific requirement to obtain a line-breaking permit before draining the header. Had the instructions specified the requirement, the personnel could have recognized the need.c

Figure  37.    Photo  Showing  Another  Line  Break.    Operators  drained  liquid  accumulation  in  another  vent  header   without  using  line-­‐breaking  procedures.    Source:  CSB.     In addition to the periodic draining of the waste gas vent header, the CSB found that DuPont La Porte operators routinely drained other hazardous process equipment (see Figure 37 and Figure 38) without using line-breaking procedures.

a DuPont line-breaking training defines a hazardous process or system as a “process or system that contains any material at any pressure that could cause a risk of injury to an individual(s), a risk of fire or explosion, an environmental risk, or an off-site risk. Examples of hazardous processes or systems include, but are not limited to, compressed fluids, especially gases in pipes and vessels; corrosive and/or flammable substances and toxic process lines; and any other lines that could contain material that is hazardous on contact or inhalation, including fluid whose temperature is higher than 140°F (60°C) or lower than 14°F (-10°C).” b DuPont’s corporate line-breaking standard and DuPont La Porte’s site line-breaking procedure states, “A written job plan that specifically addresses safety, health, and environment (SHE) issues shall be prepared and implemented for all line breaks on hazardous processes and systems until all hazards have been learned or controlled. The job plan shall be prepared by qualified personnel and reviewed by everyone involved in the work prior to the start of the line break.” c At the DuPont La Porte site, if a procedure described how to do a line break and the appropriate precautions to take, personnel were not required to obtain a permit.

  Page  112  

La  Porte,  Texas  |  Incident  Date:  November  15,  2014  |  No.  2015-­01-­I-­TX   U.S.  Chemical  Safety  and   Hazard  Investigation  Board   Toxic  Chemical  Release  at  the   DuPont  La  Porte  Chemical  Facility  

Figure  38.    Methylene  Chloridea  Compressor.    Photo  shows  where  operators  routinely  drained  liquid  accumulation   from  a  methylene  chloride  compressor  without  using  line-­‐breaking  procedures.    Source:  CSB.   In both February and October 2014, DuPont La Porte personnel held problem-solving meetings with two different shifts of operations personnel to discuss high-pressure events in the waste gas vent header, and both times personnel identified liquid accumulation in piping low points as well as draining liquid from the vent header. Additionally, both shifts proposed modifying piping to eliminate low points where liquid accumulated as a potential solution. These meetings, however, did not ensure that personnel were safely troubleshooting the high-pressure events. It is important for companies to recognize that problem-solving sessions are opportunities to evaluate hazards and ensure that MOCs, operating procedures, and safe work practices are being used. In situations with unknown conditions, safe work practices required by PSM provide an organized approach to proceed safely. Consistently using safe work practices, such as line-breaking permits, ensures that each time a piece of process equipment is put into a nonroutine situation, personnel use effective safeguards. Furthermore, a permit process can address procedures, hazard analysis, PPE, and safeguards. Additionally, if hazards are identified, corrective actions should be developed, and effective safeguards should be implemented. GUIDANCE  TO  INDUSTRY   Companies should recognize that nonroutine operations such as line breaking—even with established permit processes—can represent significant potential dangers. One way to help ensure that personnel understand the permit process is to train them on the different scenarios that would trigger a permit. Companies should analyze

a Methylene chloride is a toxic chemical that can cause death at certain concentrations [93].

  Page  113    

La  Porte,  Texas  |  Incident  Date:  November  15,  2014  |  No.  2015-­01-­I-­TX   U.S.  Chemical  Safety  and   Hazard  Investigation  Board   Toxic  Chemical  Release  at  the   DuPont  La  Porte  Chemical  Facility   recurring operational or safety issues that trigger permits and eliminate the underlying causes of those issues. In instances requiring repeated line breaking, a hazard analysis should be performed, and an engineering solution should be applied (following an effective MOC) to avoid recurrence of the hazard.   SHIFT  COMMUNICATION  PRACTICES   Companies should develop procedures and practices for effective communication among their personnel (Figure 39). Effective communication depends on reliable and complete information that is transmitted and received in a timely manner. Understanding the information is imperative for safe operations. In its Guidelines for Risk Based Process Safety, CCPS outlines several approaches for communications including formalizing communications between workers, formalizing communications between shifts, and formalizing communications between work groups. Depending on the type of communication and group involved, verbal or written communication may be appropriate. When verbal communication is used, there should be a sufficient dialogue to verify that the person receiving information understands it. Additionally, personnel can use log books and written communications to transmit particularly important information. Using a combination of these two methods can benefit operations, as the CCPS book notes in the section on how formalize shift communications [52, pp. 475-76]. During the troubleshooting operations, DuPont personnel relied upon verbal communications to convey the Technical Team’s plan to the incoming shift (the shift working at the time of the incident) [1, pp. 25-26]. Post- incident, it remains unclear what the prior shift communicated to the incoming shift about the Technical Team’s plan and the status of the troubleshooting, because this information was communicated only verbally.a According to a DuPont training, “An effective shift turnover is important for chemical operations to ensure continuity across operating shifts and ensure all operating personnel fully understand both normal and abnormal or unusual conditions within the operating area in order to avoid misunderstandings or lack of information.”

a The only written communication to the night shift supervisor was a note in the shift log that stated: “Unplugging M[e]SH Header.” MeSH is DuPont’s abbreviation for methyl mercaptan [1, p. 26]. Figure  39.    Where  Shift  Communication  Falls  on  DuPont’s  PSM  Wheel  [54,  p.  2].     Source:  DuPont,  with  annotations  by  CSB.  

  Page  114  

La  Porte,  Texas  |  Incident  Date:  November  15,  2014  |  No.  2015-­01-­I-­TX   U.S.  Chemical  Safety  and   Hazard  Investigation  Board   Toxic  Chemical  Release  at  the   DuPont  La  Porte  Chemical  Facility   Having continuity in operations from shift to shift ensures that processes run smoothly and equips workers coming on shift with information that helps strengthen process safety performance. During the troubleshooting operations, DuPont relied upon verbal communications at several key times: •   The Technical Team’s verbal communication of the plan to the day shift supervisor [1, p. 25]. •   The face-to-face verbal communication between shift supervisors to transition the efforts from the day shift to the night shift [1, pp. 25-26]. Reliance on verbal communication during this troubleshooting operation proved detrimental because this problem was novel, and the night shift supervisor (referred to in this report as the “Shift Supervisor”) was learning of the shutdown and subsequent startup difficulties for the first time when he came on shift. Although the Technical Team verbally communicated with the day shift supervisor, the Technical Team did not meet with the newly involved night shift supervisor, nor did it communicate verbally or in writing with the night shift operations personnel. Improved communication could have helped ensure continuity of the troubleshooting operation by better informing the night shift of all the relevant activities that had occurred during the week and the steps needed to continue with the troubleshooting process. It is important for a company to assess the type of communication necessary for effective information sharing between shifts and between departments or divisions of a company. The more complicated the process and the more novel the problem, the more imperative it is to have effective communication. Consideration should be given to using multiple modes of communication (including written communication) to ensure that all affected employees get the information they need to perform their jobs safely, within the broader context of other ongoing operational and process safety issues, to maximize the chance for continuity and safety in operations. GUIDANCE  TO  INDUSTRY   Effective communication between different operational units at a facility, and between supervisors and workers on changing shifts, is critical to safety. Communication is necessary to convey the status of operations, ongoing changes, abnormalities, unusual operating conditions, or other relevant issues associated with chemical process equipment. The more complex the process involved, the greater the imperative to ensure that communication is effective. Reliance solely upon one form of communication, especially verbal communication, can leave the workforce vulnerable to potential gaps in information communicated, misunderstandings, or absence of critical information in what oftentimes can be an evolving situation. 7   ADDITIONAL  FACTS,  CONDITIONS,  AND  CIRCUMSTANCES  IDENTIFIED   The CSB is tasked with investigating and reporting “to the public in writing the facts, conditions, and circumstances and the cause or probable cause of any accidental release resulting in a fatality, serious injury, or

  Page  115    

La  Porte,  Texas  |  Incident  Date:  November  15,  2014  |  No.  2015-­01-­I-­TX   U.S.  Chemical  Safety  and   Hazard  Investigation  Board   Toxic  Chemical  Release  at  the   DuPont  La  Porte  Chemical  Facility   substantial property damages.”a This information is beneficial in promoting safe workplaces and helping to protect workers, the public, and the environment. The CSB identified numerous conditions and circumstances that existed at the time of the November 15, 2014 DuPont La Porte incident. In September 2015, the CSB issued an Interim Recommendations report to address conditions and circumstances, some of which were causal to the incident, before the DuPont La Porte Lannate® facility restarted [1]. Similar to its Interim Recommendations, the CSB identified a condition and circumstance, DuPont La Porte’s employee incentive program, that could be strengthened to further promote safe workplaces at DuPont legacy sites. Section 7.1 addresses the guidance for incentive compensation programs that existed at the time, and the corresponding Guidance to Industry section covers newly published OSHA guidance and industry guidance.   EMPLOYEE  INCENTIVE  PROGRAM   Companies should ensure that safety incentive programs do not disincentivize personnel from reporting injuries or other deficiencies in process safety management systems.b The DuPont La Porte facility implemented a variable compensation (bonus) system called the La Porte Local Performance Based Compensation (LPBC) program. The LPBC, however, did not use process safety management performance metrics. Instead, it used a safety modifier based solely on OSHA total recordable injuries, and it was constructed in a way that could have potentially disincentivized reporting injuries. The stated purpose of the LPBC, which was in effect at the time of the November 2014 incident, was “to provide the opportunity for eligible employees to share in business results that exceed expectations.” This program created incentive compensation opportunities for DuPont La Porte employees in various categories, including operators, mechanics, and general helpers, who were represented by  the International Chemical Workers Union Council of the United Food and Commercial Workers (ICWUC/UFCW) Local 900C labor union. The structure of the LPBC program for this group of employees evolved over the established range of performance years but involved two primary components. The first part, referred to as the Business Metric,

a 42 U.S.C. § 7412(6)(C)(i). b Under OSHA’s Recording and Reporting Occupational Injuries and Illnesses regulations, an employer “must establish a reasonable procedure for employees to report work-related injuries and illnesses promptly and accurately. A procedure is not reasonable if it would deter or discourage a reasonable employee from accurately reporting a workplace injury or illness” (29 C.F.R. § 1904.35(b)(1)(i)). The OSH Act and OSHA regulations, including its Recording and Reporting Occupational Injuries and Illnesses regulations, prohibit employers from discriminating, retaliating, or instituting other adverse consequences on employees who report injuries or other safety concerns. According to OSHA, “OSHA’s Whistleblower Protection Program enforces the whistleblower provisions of more than twenty whistleblower statutes protecting employees who report violations of various workplace safety and health, airline, commercial motor carrier, consumer product, environmental, financial reform, food safety, health insurance reform, motor vehicle safety, nuclear, pipeline, public transportation agency, railroad, maritime, and securities laws. Rights afforded by these whistleblower protection laws include, but are not limited to, worker participation in safety and health activities, reporting a work-related injury, illness or fatality, or reporting a violation of the statutes herein” 166(1)(iv)).

  Page  116  

La  Porte,  Texas  |  Incident  Date:  November  15,  2014  |  No.  2015-­01-­I-­TX   U.S.  Chemical  Safety  and   Hazard  Investigation  Board   Toxic  Chemical  Release  at  the   DuPont  La  Porte  Chemical  Facility   rewarded success with respect to site financial goals, such as increases in after-tax operating income and improvement in cash flow from operations. The second part, referred to as Line of Sight, represented a weighted average of operational performance metrics among the different units at the DuPont La Porte site, and consisted of things like reducing costs and exceeding production targets. Any incentive eligible to be paid for exceeding business performance goals, however, would then potentially be reduced by what the LPBC termed a “safety modifier.” For example, in performance year 2011, the DuPont La Porte site established the safety modifier based on the number of OSHA total recordable injuries, with the number of recordable injuries causing a reduction in available incentive award payments that were otherwise due to be paid to members of that portion of the workforce. Specifically, at the program’s start in 2011, if there were three or fewer recordable injuries, the LPBC set the safety modifier value at 1, which did not reduce the incentive payable for business performance; however, as more recordable injuries occurred, the safety modifier incrementally reduced the total incentive paid to employees.a Over the years, the LPBC evolved in terms of how the safety modifier worked. In 2014, the year of this incident, the LPBC adjusted the safety modifier so that every reported worker injury would decrease the group’s bonus payout by 5 percent, with a maximum 50 percent reduction of any available bonus paid to employees. By using a safety modifier that considered only worker injuries, DuPont La Porte equated safety performance with occupational safety metrics, similar to DuPont’s Safety Perception Surveys. Thus, DuPont La Porte did not include a process safety performance metric in its incentive. A disproportionate emphasis on occupational safety metrics as the measurement for safety performance could confuse personnel into viewing occupational safety and process safety as the same or perceiving that occupational safety is more important than process safety. Furthermore, emphasizing a low number of total recordable injuries could give personnel false confidence about process safety performance.

a In 2011, if there were four recordable injuries, then the modifier reset to 0.9, if there were five recordable injuries it reset to 0.8, and for six or more recordable injuries it reset to 0.75. Over subsequent years, the safety modifier became more impactful in a negative way if the site had not improved its total recordable injury rate from the previous year. As stated recently by CCPS in its publication on process safety culture, Essential Practices for Creating, Strengthening, and Sustaining Process Safety Culture,

“Money is one of the strongest influences on human behavior, for better or worse. When developing compensation and incentive schemes based on process safety performance, it is critical to design them carefully to reinforce the desired cultural attributes and behaviors. It is equally critical to be aware of the many pitfalls that lead a well-intentioned compensation scheme to unwittingly support negative behaviors [56, p. 109].”

  Page  117    

La  Porte,  Texas  |  Incident  Date:  November  15,  2014  |  No.  2015-­01-­I-­TX   U.S.  Chemical  Safety  and   Hazard  Investigation  Board   Toxic  Chemical  Release  at  the   DuPont  La  Porte  Chemical  Facility   If a company decides to use an incentive to focus on safety performance, it should consider having a process safety component that uses leading indicators over multiple years. Because process safety incidents are typically infrequent, personnel can perform poorly in process safety for a long time without experiencing a major accident [56, p. 110]. Therefore, using lagging indicators, such as the number of process safety incidents, could hide poor process safety performance [56, p. 110]. On the other hand, using leading indicators related to correct behaviors, such as percentage of inspection completion, is better because the events on which such indicators are based happen more frequently [56, p. 110]. Additionally, companies can drive long-term process safety performance by using multiyear incentives because process safety needs to be performed consistently well over time [56, p. 110]. If companies employ yearly schemes, management should ensure that rewards are provided in recognition of steady process safety performance over the course of a year [56, pp. 110-111]. If a process safety incentive is used, companies should ensure that process safety incentives are measuring key aspects of process safety management systems or process safety culture, and not personal or occupational safety metrics [56, p. 112]. Furthermore, to prevent confusion between process safety and occupational safety, management should not combine process safety indicators and occupational safety indicators into a single safety incentive [56, p. 112]. Regardless of its precise formulation and despite small changes made to the safety modifier throughout the range of years represented in this program, DuPont La Porte’s LPBC potentially created a disincentive for workers to report injuries. Employees working under these types of programs would report injuries at financial risk to themselves and their co-workers. In addition, safety incentive programs like this one may not be effective in driving safety improvement [74]. Furthermore, when constructed in this manner, a safety incentive program can be susceptible to “gaming,” with workers refraining from reporting workplace injuries to earn the otherwise available incentive due to be paid [74].a This phenomenon can make it difficult to spot trends in worker safety issues, leaving other workers vulnerable to the same injury as potentially dangerous conditions go uncorrected, among other practical concerns. As OSHA Deputy Assistant Secretary Fairfax explained in a March 12, 2012, memorandum to agency regional administrators and whistleblower program managers, If employees do not feel free to report injuries or illnesses, the employer’s entire workforce is put at risk. Employers do not learn of and correct dangerous conditions that have resulted in injuries, and injured employees may not receive the proper medical attention, or the workers’ compensation benefits to which they are entitled. Ensuring that employees can report injuries or illnesses without fear of retaliation is therefore crucial to protecting worker safety and health [75]. The memorandum further expressed concern that these types of safety incentive bonus programs may place implicit pressure on employees not to report workplace injuries or illnesses:

a In a recent National Safety Council article, one corporate safety manager noted that these types of incentive programs have surface allure but do not usually drive actual safety improvement, and suggested that some incentive programs may instead actually promote “covering up” and “cooking the books” through underreporting or nonreporting of workplace illnesses or injuries so employees can remain eligible for rewards [74].

  Page  118  

La  Porte,  Texas  |  Incident  Date:  November  15,  2014  |  No.  2015-­01-­I-­TX   U.S.  Chemical  Safety  and   Hazard  Investigation  Board   Toxic  Chemical  Release  at  the   DuPont  La  Porte  Chemical  Facility   Some employers establish programs that unintentionally or intentionally provide employees an incentive to not report injuries. For example, an employer might enter all employees who have not been injured in the previous year in a drawing to win a prize, or a team of employees might be awarded a bonus if no one from the team is injured over some period of time. Such programs might be well-intentioned efforts by employers to encourage their workers to use safe practices. However, there are better ways to encourage safe work practices, such as incentives that promote worker participation in safety-related activities, such as identifying hazards or participating in investigations of injuries, incidents or “near misses.” OSHA’s [Voluntary Protection Programs] Guidance materials refer to a number of positive incentives, including providing tee shirts to workers serving on safety and health committees; offering modest rewards for suggesting ways to strengthen safety and health; or throwing a recognition party at the successful completion of company-wide safety and health training [75]. After the November 2014 incident, the DuPont La Porte site changed its LPBC bonus system to align it with OSHA guidance that existed at the time, such that the safety modifier would not discourage workers from reporting injuries. The new 2015 La Porte safety modifier was based on employees’ completing computer- based training courses and annual medical examinations. The CSB viewed DuPont La Porte’s correction of the potential disincentive in the LPBC as a positive development. The CSB lacks documentation showing that workers on DuPont La Porte’s Safety Committee or those covered by the LPBC objected to this safety modifier prior to the incident. None of the workers on the Safety Committee participated in the capacity of official union representative of ICWUC/UFCW Local 900C. However, when workers have concerns about an incentive program that can impact the reporting of incidents, they should report these concerns to their union, if they are represented, or to a health and safety committee or a manager. It is imperative, regardless of having a particular incentive program, that workers report unsafe conditions and safety (personal or process) incidents to help prevent future incidents. Consistent with OSHA regulations and guidance, all legacy DuPont sites should evaluate any safety incentive programs or variable pay initiatives that reduce employee bonus awards based solely upon injury rates, or that otherwise potentially impair OSHA record-keeping requirements, and change the payout structure to incentivize improved safety performance. OSHA itself does not consider “conditioning a benefit on compliance with legitimate safety rules or participation in safety-related activities” to violate section 1904.35(b)(1)(iv), so long as programs that do so are instituted appropriately.a As DuPont reviews incentive programs at its legacy sites, the CSB similarly encourages DuPont to continue to explore ways to encourage positive safety performance, with respect to both personal and process safety. Specifically, the CSB encourages DuPont to consider expanding consideration of safety incentive programs by broadening the company’s focus beyond personal safety

a “For example, raffling off a $500 gift card each month in which employees universally complied with legitimate workplace safety rules—such as using required hard hats and fall protection and following lockout-tagout procedures—would not violate the rule. Likewise, rewarding employees for participating in safety training or identifying unsafe working conditions would not violate the rule. On the contrary, OSHA encourages employers to find creative ways to incentivize safe work practices and accident-prevention measures that do not disproportionately penalize workers who report work-related injuries or illnesses” [158].

  Page  119    

La  Porte,  Texas  |  Incident  Date:  November  15,  2014  |  No.  2015-­01-­I-­TX   U.S.  Chemical  Safety  and   Hazard  Investigation  Board   Toxic  Chemical  Release  at  the   DuPont  La  Porte  Chemical  Facility   programs. If DuPont desires to retain safety incentive programs, the company should also consider how it can incentivize safety more holistically, ensuring that process safety and major accident prevention efforts are bolstereda along with more traditional efforts aimed at reducing workplace illnesses and injuries. In no case, however, should any incentive program act in any way to discourage the required reporting of safety issues such as injuries, illnesses, incidents, hazards, or near-miss incidents. GUIDANCE  TO  INDUSTRY   Understanding how incidents occur can be beneficial in preventing future worker injuries and strengthening process safety management systems. Some safety incentive programs, however, may create a culture of nonreporting of safety incidents, potentially hampering learning from the underlying events, possibly resulting in a failure to address the causes of the incident. In response to these types of concerns, OSHA created record- keeping requirements and issued regulations to prevent whistleblower retaliation for reporting injuries.b, c Additionally, OSHA recently published guidance on how to formulate an incentive without disincentivizing workers from reporting injuries. On October 11, 2018, Kim Stille, Acting Director of Enforcement Programs at OSHA, issued a memorandum to Regional Administrators titled “Clarification of OSHA’s Position on Workplace Safety Incentive Programs and Post-Incident Drug Testing Under 29 C.F.R. § 1904.35(b)(1)(iv)” [76]. In that memorandum, Acting Director Stille sought to clarify OSHA enforcement around workplace safety incentives paid by employers. She stated that “29 C.F.R. § 1904.35(b)(1)(iv) does not prohibit workplace safety incentive programs” as long as such programs “are not implemented in a manner that discourages reporting” of workplace injuries [76]. The memorandum then elaborated on how an employer could avoid even “inadvertent deterrent effects of a rate- based incentive program by taking positive steps to create a workplace culture that emphasizes safety, and not

a According Andrew Hopkins, “Other things like incentives need to be rethought. Performance agreements and bonuses now reinforce the priorities of speed and production. They’ve been made to reinforce personal safety in recent years. They need now to be rethought again to incentivize the avoidance of catastrophe” [67, p. 3]. b According to the 2012 Fairfax memorandum, “Incentive programs that discourage employees from reporting their injuries are problematic because, under section 11(c), an employer may not ‘in any manner discriminate’ against an employee because the employee exercises a protected right, such as the right to report an injury.… If an employee of a firm with a safety incentive program reports an injury, the employee, or the employee’s entire work group, will be disqualified from receiving the incentive, which could be considered unlawful discrimination. One important factor to consider is whether the incentive involved is of sufficient magnitude that failure to receive it ‘might have dissuaded reasonable workers from’ reporting injuries. Burlington Northern & Santa Fe Railway Co. v. White, 548 U.S. 53, 68 (2006).” The memorandum continues, “In addition, if the incentive is great enough that its loss dissuades reasonable workers from reporting injuries, the program would result in the employer’s failure to record injuries that it is required to record under Part 1904. In this case, the employer is violating that rule, and a referral for a recordkeeping investigation should be made.… This may be more likely in cases where an entire workgroup is disqualified because of a reported injury to one member, because the injured worker in such a case may feel reluctant to disadvantage the other workgroup members” [75]. c In explaining OSHA’s amended regulation found at 29 C.F.R. § 1904.35(b)(1)(i), OSHA Deputy Assistant Secretary Dorothy Dougherty made explicit the longstanding requirement for employers to have a reasonable procedure for employees to report work- related injuries and illnesses, and (b)(1)(iv) incorporated the existing prohibition on retaliating against employees for reporting work- related injuries or illnesses under section 11(c) of the OSH Act, 29 U.S.C. § 660(c). She also made clear, however, that “Section 1904.35(b)(1)(iv) does not prohibit safety incentive programs. Rather, it prohibits taking adverse action against employees simply because they report work-related injuries or illness. Withholding a benefit—such as a cash prize drawing or other substantial award— simply because of a reported injury or illness would likely violate section 1904.35(b)(1)(iv) regardless of whether such an adverse action is taken pursuant to an incentive program [158].”

  Page  120  

La  Porte,  Texas  |  Incident  Date:  November  15,  2014  |  No.  2015-­01-­I-­TX   U.S.  Chemical  Safety  and   Hazard  Investigation  Board   Toxic  Chemical  Release  at  the   DuPont  La  Porte  Chemical  Facility   just rates” [76]. For example, Acting Director Stille noted that any inadvertent deterrent effect caused by a rate- based incentive program could be “counterbalanced” by affirmative steps such as •   creating an incentive program that rewards employees for identifying unsafe conditions in the workplace; •   implementing a training program for all employees to reinforce reporting rights and responsibilities, emphasizing the employer’s nonretaliation policy; or •   instituting a mechanism for accurately evaluating employees’ willingness to report injuries and illnesses [76]. In Essential Practices for Creating, Strengthening, and Sustaining Process Safety Culture, CCPS posed the question of whether a company should forgo all process safety–related incentives. CCPS stated that an argument can be made to that effect, with working injury-free serving as a long-term benefit for any worker. Nevertheless, money is a strong human motivator, and if used with care, it can influence behavior for the better [56, p. 109]. As with occupational safety–based incentives, management should consider whether the use of a process safety incentive creates a potential for inverse effects. An incentive could lead to the opposite of the desired behavior (e.g., using incident numbers or incident reduction for the basis of an incentive “may drive personnel to hide or under-report incidents”) [56, p. 110]. Companies should assess safety incentive programs currently in place to ensure they are effective in driving positive safety change and do not serve as a disincentive for reporting workplace safety issues. 8   KEY  FINDINGS   In its investigation of the November 15, 2014, DuPont La Porte incident, the CSB found that

  1.   DuPont did not effectively respond to a toxic chemical release;
  2.   DuPont’s corporate process safety management system did not ensure that DuPont La Porte

implemented and maintained an effective process safety management system; and

  1.   DuPont La Porte did not assess its culture for process safety in the site’s Safety Perception Surveys or

any other formal assessment program, allowing serious process safety deficiencies to exist at the site. The CSB issues recommendations to the DuPont La Porte facility, DuPont, and the Local 900C of the International Chemical Workers Union Council of the United Food and Commercial Workers, as well as guidance and key lessons for the chemical industry, to address these key findings and to help prevent future incidents.

  Page  121    

La  Porte,  Texas  |  Incident  Date:  November  15,  2014  |  No.  2015-­01-­I-­TX   U.S.  Chemical  Safety  and   Hazard  Investigation  Board   Toxic  Chemical  Release  at  the   DuPont  La  Porte  Chemical  Facility   9   SAFETY  GUIDANCE   The CSB, through the course of its investigation, identified key lessons from the November 15, 2014 incident that companies can use at their facilities (for more information, see Guidance to Industry from referenced sections).

  1.   Companies should ensure that employees understand the hazards of chemicals that they are working

with and may be potentially exposed to if there is a release. Where there are multiple hazardous chemicals, such as methyl isocyanate (MIC) and methyl mercaptan, it is important that companies effectively train workers on the hazards of each chemical at their facility. Furthermore, companies should train workers who handle multiple highly toxic chemicals, such as methyl mercaptan and MIC, to treat these chemicals with equal importance. This training is important for workers to help ensure they have a working knowledge of the relevant chemical hazards. (Section 3: Delayed Awareness of Toxic Chemical Release)

  1.   Automatic alarms designed to alert personnel of hazardous conditions—such as a release of a toxic

chemical or the existence of an explosive atmosphere—can relay critical safety information immediately to personnel, without the potential delays inherent in a system that relies solely on a control room operator to communicate safety alarms verbally to operators in the field. (Section 3: Delayed Awareness of Toxic Chemical Release)

  1.   Specific technical knowledge from unit experts—including technical and operations personnel—can be

invaluable to the incident commander in an emergency at a chemical processing facility. Companies need to ensure that these individuals are preidentified as technical support personnel and that backup capability is available in the event the primary technical support personnel become unavailable. (Section 4.2: Process Coordinator Was Missing)

  1.   Plant emergency procedures should clearly outline the alerting and notification protocols for different

types of plant emergencies. These procedures should also include guidance for situations in which there is insufficient initial information to effectively assess the nature of the problem and the level of emergency response team resources required. (Section 4.3.1: Call for ERT Response)

  1.   Even though industrial facilities may infrequently call upon emergency response vehicles, it is essential

that those vehicles function as intended when needed. To ensure emergency vehicle reliability, companies must develop and apply regular maintenance and testing schedules for their emergency response vehicles. (Section 4.3.2: ERT Mini-Pumper Truck Not Operational)

  1.   Companies need a reliable means for emergency response teams to characterize hazardous atmospheres.

Companies should provide air monitoring equipment to emergency response teams and train those teams on how to operate the equipment and interpret monitoring results. At facilities that assign the inspection, maintenance, and storage of portable air monitoring equipment to personnel who are not members of the emergency response team, the company should ensure that team members know where

  Page  122  

La  Porte,  Texas  |  Incident  Date:  November  15,  2014  |  No.  2015-­01-­I-­TX   U.S.  Chemical  Safety  and   Hazard  Investigation  Board   Toxic  Chemical  Release  at  the   DuPont  La  Porte  Chemical  Facility   the equipment is stored and can access it. (Section 4.4.1: Entry into Potentially Explosive Atmosphere)

  1.   High-hazard areas should be equipped with adequate detectors, alarms, and surveillance technology to

identify whether there is a chemical release (or other type of emergency) and if personnel are affected. (Section 4.4.2: No Technology to Locate Missing Workers)

  1.   Companies need to develop a system to update emergency planning documents when pertinent hazards

are identified. Changes to emergency planning documents should be effectively communicated to the site emergency response team. (Section 4.4.3: Unrecognized Manufacturing Building Collapse Hazard)

  1.   Chemical facilities should ensure that their emergency response plans include maps showing the layout

of buildings containing hazardous chemicals, for use by emergency responders and to aid evacuation and rescue efforts. Facilities should also coordinate regularly scheduled site tours for both plant and external emergency responders to develop strong working relationships and help ensure responders are familiar with facility access points, hazards, emergency response issues, and site or facility layout. Additionally, facilities should familiarize responders with process structures or buildings by having periodic drills inside them, to improve responder navigation during emergencies. To enhance responder performance, members of an emergency response team should train together, especially when multiple companies are staffing a single, integrated team. (Section 4.5: Difficulties Navigating Manufacturing Building)

  1.  When a process safety incident occurs, such as a chemical release, it can be beneficial for technical

personnel who are not immediately involved in emergency response functions to analyze process data to assess the source, scope, and magnitude of the incident. This analysis can help the company (and the incident commander) identify needed equipment manipulations to stop or control the incident, such as shutting down pumps or closing isolation valves. (Section 4.6: No Analysis of Process Data to Identify Source of Leak)

  1.  Companies should ensure emergency response team members are trained to (1) physically designate the

hot zone; (2) communicate the location of the hot zone and entry control points to all personnel assisting with the emergency response, including operations personnel; and (3) control entry and exit points of the hot zone. (Section 4.7: Inadequate Creation and Control of Hot Zone)

  1.  Dispersion modeling of chemical releases can be an effective risk-based emergency response tool, but

its results are highly dependent on accurate input data. During an emergency, it can sometimes be difficult to obtain an accurate release rate, limiting the accuracy of resulting models. Companies should not rely on unsupported data when making critical emergency response decisions, such as those affecting workers, members of the public, or people or property in the surrounding area. In emergencies that could affect the public and in which chemical release rates cannot be accurately estimated (for model input), written guidelines for how and when to alert the public should be available to emergency responders. As better information about the release becomes available, the public protection zone can be adjusted accordingly. (Section 4.8.1: Release Modeling)

  Page  123    

La  Porte,  Texas  |  Incident  Date:  November  15,  2014  |  No.  2015-­01-­I-­TX   U.S.  Chemical  Safety  and   Hazard  Investigation  Board   Toxic  Chemical  Release  at  the   DuPont  La  Porte  Chemical  Facility  

  1.  Monitoring for hazardous gases along the fence line at chemical facilities can help companies

understand the extent of a release. This monitoring can be performed by fixed detectors, which can continually collect and record data, providing early notification of releases outside the property. When fixed detectors are not available, a person using a portable gas detector may also perform air monitoring. This strategy, however, introduces additional risk because that individual may enter a hazardous environment unknowingly. Proper personal protective equipment, including respiratory protection, is needed during manual air monitoring operations. (Section 4.8.4: Air Monitoring)

  1.  Employing any particular management system on its own, without additional work aimed at successful

implementation, may not be sufficient to prevent major chemical incidents. Companies should conduct periodic comprehensive assessments of their process safety management systems and their implementation of these systems at established intervals to evaluate and identify opportunities to strengthen their systems’ effectiveness. (Section 5.3: American Chemistry Council)

  1.  Companies should ensure that when a process safety management system changes, their sites update

their programs simultaneously and adhere to those changes. The ability to adapt quickly to industry trends and field learnings can be beneficial. To maximize the value of improvements, companies should consider reevaluating sites to ensure consistency with evolving practices. (Section 5.3.3: Responsible Care Conformance Audits)

  1.  Companies should invest time and resources to conduct audits. These resources should be used to

ensure that audits are robust and comprehensive. (Section 5.3.3: Responsible Care Conformance Audits)

  1.  Personal safety performance and process safety performance are two different safety measures that all

chemical process facilities should evaluate. Personal injury statistics are not an effective gauge of the quality of process safety management systems or process safety culture. (Section 5.4.1: Building a Safety Culture)

  1.  Companies should have a process in place to ensure that hazard scenarios are fully developed and that

process hazard analysis (PHA) teams assign appropriate initiating event frequencies and consequence severities to the scenario because it can make a significant difference in safeguard requirements. Additionally, PHA teams need to ensure that the safeguards applied to the hazard scenario are relevant and effective in controlling the hazard. (Section 6.1:Process Hazard Analysis Evaluation)

  1.  Companies should ensure before corrective actions are closed that the intent of a recommendation is

met. One way to make the intention of the recommendation the focus of a corporate or site action is to evaluate the substance of the corrective action in addition to the time it takes to complete the action. (Section 6.2: Implementation of Corrective Actions)

  1.  Companies should develop an action plan to identify and control hazards during troubleshooting

operations. There are multiple approaches a company can take to address troubleshooting, including PHAs, operating procedures, management of change (MOC) procedures, and safe work practices. (Section 6.3: Process Safety Practices during Troubleshooting Operations)

  Page  124  

La  Porte,  Texas  |  Incident  Date:  November  15,  2014  |  No.  2015-­01-­I-­TX   U.S.  Chemical  Safety  and   Hazard  Investigation  Board   Toxic  Chemical  Release  at  the   DuPont  La  Porte  Chemical  Facility  

  1.  Companies should always use MOCs where required by corporate policy or federal safety regulations

(OSHA’s Process Safety Management standard or the EPA’s Risk Management Plan rule). Special attention should be paid to nonroutine or abnormal operations because there may be issues with safety systems, equipment, procedures, or personnel practices that can create additional hazards, potentially leading to serious safety incidents if there are poor management of change practices. MOC reviewers should be thoughtful and comprehensive, so potential dangers can be avoided or mitigated. (Section 6.4: MOC Practices)

  1.  Companies should recognize that nonroutine operations such as line breaking—even with established

permit processes—can represent significant potential dangers. One way to help ensure that personnel understand the permit process is to train them on the different scenarios that would trigger a line- breaking permit. Companies should analyze recurring operational or safety issues that trigger permits and eliminate their underlying causes. In instances requiring repeated line breaking, for example, a hazard analysis should be performed, and an engineering solution should be applied (following an effective MOC) to avoid recurrence of the hazard. (Section 6.5: Line-Breaking Practices)

  1.  Effective communication between different operational units at a facility, and between supervisors and

workers on changing shifts, is critical to safety. Communications are essential to convey the status of operations, any ongoing changes, abnormalities, unusual operating conditions, or other relevant issues associated with chemical process equipment. The more complex the process involved, the more of an imperative exists to ensure that communication is effective. Reliance solely upon one form of communication, especially verbal communication, can leave the workforce vulnerable to potential gaps in information communicated, misunderstandings, or the absence of critical information in what oftentimes can be an evolving situation. (Section 6.6: Shift Communication Practices)

  1.  Employee incentive programs that reduce bonuses to employees based upon the number of recordable

injuries—or other similar metric—can create a disincentive for workers to report injuries or incidents. Understanding how incidents occur can be beneficial in preventing future worker injuries and strengthening process safety management systems. Some safety incentive programs, however, may create a culture of nonreporting of safety incidents, potentially hampering learning from the underlying events, possibly resulting in a failure to address the causes of the incident. If employees do not feel free to report workplace injuries, incidents, or near misses, the employer’s entire workforce is put at risk. Ensuring that employees can report injuries or other process safety management system deficiencies is therefore central to protecting worker safety and health and aiding accident prevention. (Section 7.1: Employee Incentive Program) 10   RECOMMENDATIONS   The CSB makes the following safety recommendations:

  Page  125    

La  Porte,  Texas  |  Incident  Date:  November  15,  2014  |  No.  2015-­01-­I-­TX   U.S.  Chemical  Safety  and   Hazard  Investigation  Board   Toxic  Chemical  Release  at  the   DuPont  La  Porte  Chemical  Facility     DUPONT  LA  PORTE,  TEXAS,  CHEMICAL  FACILITY     2015-01-I-TX-R8 Work together with emergency response team (ERT) member companies (DuPont, Chemours, Kuraray, and Invista), the International Chemical Workers Union Council of the United Food and Commercial Workers (ICWUC/UFCW) Local 900C, and the ICWUC/UFCW staff (if requested by the Local 900C) to update the DuPont La Porte emergency response plan. The emergency response program should ensure that periodic exercises or drills are performed on new procedures developed to address key lessons to strengthen ERT capabilities. The emergency response program should address the following: •   Preidentifying unit experts as technical support personnel and ensuring that backup capability is available in the event the primary technical support personnel become unavailable. (Section 4.2: Process Coordinator Was Missing)

•   Clearly detailing in plant emergency procedures the alerting and notification protocols for different types of plant emergencies. Provide initial training to new plant personnel and periodic training to all plant personnel on these emergency communication procedures. These procedures should also include guidance for emergency responders when there is insufficient initial information to effectively assess the nature of the problem and the level of ERT resources required. (Section 4.3.1: Call for ERT Response) •   Developing and applying regular maintenance schedules for emergency response vehicles consistent with the National Fire Protection Association’s Standard for the Inspection, Maintenance, Testing, and Retirement of In-Service Emergency Vehicles (NFPA 1911), which requires weekly visual and operational checks of emergency vehicles and has example checklists to use when performing preventive maintenance on emergency vehicles. (Section 4.3.2: ERT Mini-Pumper Truck Not Operational) •   Ensuring that ERTs have reliable means to characterize hazardous atmospheres, for example equipment that monitors toxicity, explosivity, and oxygen levels. Additionally, ensure that ERT members know where the equipment is stored, can access it, and are trained on its proper use. (Section 4.4.1: Entry into Potentially Explosive Atmosphere) •   Evaluating high-hazard areas, including PSM covered processes, to determine whether detectors and alarms are necessary to identify chemical releases (or other types of emergencies). Additionally, consider equipping high-hazard areas with surveillance technology to identify personnel in the field. (Section 4.4.2: No Technology to Locate Missing Workers) •   Developing and implementing written policy and procedures to update emergency response plan documents when hazards are identified. For example, personnel can identify these types of hazards in process hazard analyses, facility siting studies, management of change reviews, and incident investigations. Changes to emergency planning documents should be effectively communicated to the

  Page  126  

La  Porte,  Texas  |  Incident  Date:  November  15,  2014  |  No.  2015-­01-­I-­TX   U.S.  Chemical  Safety  and   Hazard  Investigation  Board   Toxic  Chemical  Release  at  the   DuPont  La  Porte  Chemical  Facility   site ERT as soon as possible after identifying the hazard. (Section 4.4.3: Unrecognized Manufacturing Building Collapse Hazard) •   Ensuring that emergency response planning accounts for difficulties in conducting response efforts, including (1) maps included in emergency response plans to show the layout of buildings containing hazardous chemicals, for use by emergency responders and to aid evacuation and rescue efforts; (2) coordination of periodic (at least annual) site tours for plant and external emergency responders; (3) training emergency responders to help ensure familiarity with facility access points, hazards, emergency response issues, and site or facility layout; and (4) building teamwork by having members (from the different companies) of the ERT field train (by conducting drills) together when practicable. (Section 4.5: Difficulties Navigating Manufacturing Building) •   Assigning knowledgeable personnel the responsibility to analyze process data to assess the source, scope, and magnitude of any incident. (Section 4.6: No Analysis of Process Data to Identify Source of Leak) •   Training emergency response team members to (1) physically designate the hot zone; (2) communicate the location of the hot zone and entry control points to all personnel assisting with the emergency response, including operations personnel; and (3) control entry and exit points of the hot zone. (Section 4.7: Inadequate Control of Hot Zone) •   Addressing in the emergency response plan how to characterize (including size, concentration, location, and direction of release) hazardous chemical releases and providing guidance on how and where people should take protective action (e.g., sheltering-in-place) in the event of a chemical release. (Section 4.8.1: Release Modeling) •   Developing a procedure in the emergency response plan to effectively monitor for hazardous gases along the fence line at chemical facilities during the release to help workers understand and clearly communicate the extent of a release. (Section 4.8.4: Air Monitoring) In addition, provide a copy of the emergency response plan to the Emergency Response Team and their local union representatives.

   LOCAL  900C  OF  THE  INTERNATIONAL  CHEMICAL  WORKERS  UNION  COUNCIL   (ICWUC)  OF  THE  UNITED  FOOD  AND  COMMERCIAL  WORKERS  (UFCW) a     2015-01-I-TX-R9

a The union members at the DuPont La Porte facility were represented by the (ICWUC) of the (UFCW) and Local 900C.

  Page  127    

La  Porte,  Texas  |  Incident  Date:  November  15,  2014  |  No.  2015-­01-­I-­TX   U.S.  Chemical  Safety  and   Hazard  Investigation  Board   Toxic  Chemical  Release  at  the   DuPont  La  Porte  Chemical  Facility   Work together with DuPont to develop and implement the emergency response plan described in Recommendation R8 (2015-01-I-TX-R8).

 

  Page  128  

La  Porte,  Texas  |  Incident  Date:  November  15,  2014  |  No.  2015-­01-­I-­TX   U.S.  Chemical  Safety  and   Hazard  Investigation  Board   Toxic  Chemical  Release  at  the   DuPont  La  Porte  Chemical  Facility   REFERENCES  

[1] U.S. Chemical Safety and Hazard Investigation Board (USCSB), "DuPont La Porte, Texas Chemical Facility Toxic Chemical Release: Interim Recommendations," 30 September 2015. [Online]. Available: https://www.csb.gov/assets/1/20/dupont_la_porte_interim_recommendations_2015-09-30_final1.pdf?15526. [2] U.S. Chemical Safety and Hazard Investigation Board (USCSB), "DuPont LaPorte Facility Toxic Chemical Release," [Online]. Available: http://www.csb.gov/dupont-laporte-facility-toxic-chemical-release-/. [3] U.S. Environmental Protection Agency (USEPA), "List of Regulated Substances under the Risk Management Plan (RMP) Program," [Online]. Available: https://www.epa.gov/rmp/list-regulated- substances-under-risk-management-plan-rmp-program. [Accessed 2017 August 28]. [4] K. Baker, "DuPont Closing Texas Plant Where 4 Died," The News Journal, 1 April 2016. [Online]. Available: https://www.usatoday.com/story/money/2016/04/01/dupont-closing-texas-plant-where-4- died/82512270/. [Accessed 29 June 2017]. [5] DuPont, "Form 8-K," 31 March 2016. [Online]. Available: https://www.sec.gov/Archives/edgar/data/30554/000003055416000115/dd33116form8-k.htm. [6] Center for Chemical Process Safety (CCPS), Continuous Monitoring for Hazardous Material Releases, CCPS/AIChE, 2009. [7] DuPont, "EPA RMP Submission for EPA Facility ID: 100000148912 La Porte Plant," 2012. [8] Center for Chemical Process Safety (CCPS), Guidelines for Technical Planning for On-Site Emergencies, 1995. [9] National Fire Protection Association (NFPA), "NFPA 1911: Standard for the Inspection, Maintenance, Testing, and Retirement of In-Service Emergency Vehicles," 2017. [Online]. Available: http://www.nfpa.org/codes-and-standards/all-codes-and-standards/list-of-codes-and- standards/detail?code=1911. [10] National Fire Protection Association (NFPA), "NFPA 472: Standard for Competence of Responders to Hazardous Materials/Weapons of Mass Destruction Incidents," 2018. [Online]. Available: http://www.nfpa.org/codes-and-standards/all-codes-and-standards/list-of-codes-and- standards/detail?code=472. [Accessed 26 12 2017]. [11] National Fire Protectioon Association (NFPA), "NFPA 1620: Standard for Pre-Incident Planning," 2015. [Online]. Available: http://www.nfpa.org/codes-and-standards/all-codes-and-standards/list-of-codes-and- standards/detail?code=1620. [Accessed 29 December 2017].

  Page  129    

La  Porte,  Texas  |  Incident  Date:  November  15,  2014  |  No.  2015-­01-­I-­TX   U.S.  Chemical  Safety  and   Hazard  Investigation  Board   Toxic  Chemical  Release  at  the   DuPont  La  Porte  Chemical  Facility   [12] U.S. Department of Transportation (USDOT), "2016 Emergency Response Guidebook," 2016. [Online]. Available: https://www.phmsa.dot.gov/sites/phmsa.dot.gov/files/docs/ERG2016.pdf. [13] U.S. Department of Labor (USDOL) Occupational Safety and Health Administration (OSHA), "OSHABrief

https://www.osha.gov/Publications/OSHA3514.html. [Accessed 10 Jan 2018]. [14] U.S. Chemical Safety and Hazard Investigation Board (USCSB), "DuPont Corporation Toxic Chemical Releases," [Online]. Available: http://www.csb.gov/dupont-corporation-toxic-chemical-releases/. [15] U.S. Chemical Safety and Hazard Investigation Board (USCSB), "E.I. DuPont De Nemours Co. Fatal Hotwork Explosion," [Online]. Available: https://www.csb.gov/e-i-dupont-de-nemours-co-fatal-hotwork- explosion/. [16] Center for Chemical Process Safety (CCPS), "Process Safety Glossary - Process Safety Management Systems," [Online]. Available: https://www.aiche.org/ccps/resources/glossary/process-safety- glossary/process-safety-management-systems. [Accessed 29 May 2019]. [17] U.S. Department of Labor (USDOL) Occupational Safety and Health Administration (OSHA), "OSHA Celebrates 40 years of accomplishments in the Workplace," 2011. [Online]. Available: https://www.osha.gov/osha40/OSHATimeline.pdf. [Accessed 25 September 2018]. [18] U.S. Department of Labor (USDOL) Occupational Safety and Health Administration (OSHA), "OSHA 3132: Process Safety Management," 2000. [Online]. Available: https://www.osha.gov/Publications/osha3132.html. [Accessed 29 March 2018]. [19] U.S. Department of Labor (USDOL) Occupational Safety and Health Administration (OSHA), "Process Safety Management Guidelines for Compliance," 1993. [Online]. Available: https://www.osha.gov/Publications/osha3133.html. [Accessed 31 August 2017]. [20] U.S. Department of Labor (USDOL) Occupational Safety and Health Administration (OSHA), "Inspection: 310260567 - Dupont Packaging & Industrial Polymers," [Online]. Available: https://www.osha.gov/pls/imis/establishment.inspection_detail?id=310260567. [Accessed 18 March 2019]. [21] K. Moran, "DuPont plant in La Porte releases acidic compound," 26 January 2007. [Online]. Available: https://www.chron.com/news/houston-texas/article/DuPont-plant-in-La-Porte-releases-acidic-compound- 1805747.php. [Accessed 18 March 2019]. [22] U.S. Department of Labor (USDOL) Occupational Safety and Health Administration (OSHA), "Deaths of four workers prompts deeper look at DuPont Safety Practices," 9 July 2015. [Online]. Available: https://www.osha.gov/news/newsreleases/region6/07092015. [Accessed 25 September 2018].

  Page  130  

La  Porte,  Texas  |  Incident  Date:  November  15,  2014  |  No.  2015-­01-­I-­TX   U.S.  Chemical  Safety  and   Hazard  Investigation  Board   Toxic  Chemical  Release  at  the   DuPont  La  Porte  Chemical  Facility   [23] U.S. Department of Labor (USDOL) Occupational Safety and Health Administration (OSHA), "Preamble to Process Safety Management of Highly Hazardous Chemicals; Explosives and Blasting Agents.," 24 February 1992. [Online]. Available: https://www.osha.gov/laws-regs/federalregister/1992-02-24. [Accessed 29 May 2019]. [24] U.S. Chemical Safety and Hazard Investigation Board (USCSB), "Regulatory Report: Chevron Richmond Refinery Pipe Rupture and Fire," 10 2014. [Online]. Available: https://www.csb.gov/chevron-refinery-fire/. [Accessed 29 10 2018]. [25] U.S. Chemical Safety and Hazard Investigation Board (USCSB), "Drilling Rig Explosion and Fire at the Macondo Well Report: Volume 4," 17 April 2016. [Online]. Available: https://www.csb.gov/macondo- blowout-and-explosion/. [Accessed 20 November 2018]. [26] U.S. Chemical Safety and Hazard Investigation Board (USCSB), "Process Safety Management for the 21st Century," [Online]. Available: https://www.csb.gov/recommendations/most-wanted-program-modernize-us- process-safety-management-regulations/. [Accessed 25 September 2018]. [27] U.S. Environmental Protection Agency (USEPA), "The Origins of EPA," [Online]. Available: https://www.epa.gov/history/origins-epa. [Accessed 3 October 2018]. [28] U.S. Environmental Protection Agency (USEPA), "General Guidance on Risk Management Program for Chemical Accident Prevention (40 CFR Part 68): Chapter 9," March 2009. [Online]. Available: https://www.epa.gov/sites/production/files/2013-11/documents/chap-09-final.pdf. [Accessed 12 October 2018]. [29] U.S. Environmental Protection Agency (USEPA), "Risk Management Plan (RMP) Rule Overview," [Online]. Available: https://www.epa.gov/rmp/risk-management-plan-rmp-rule-overview. [Accessed 3 October 2018]. [30] U.S. Environmental Protection Agency (USEPA), "EPA and Justice Department Reach $3.1 Million Settlement with DuPont for Alleged Chemical Accident Prevention Violations," 26 July 2018. [Online]. Available: https://www.epa.gov/newsreleases/epa-and-justice-department-reach-31-million-settlement- dupont-alleged-chemical-accident. [Accessed 14 November 2018]. [31] U.S. Chemical Safety and Hazard Investigation Board (USCSB), "U.S. Chemical Safety and Hazard Investigation Board’s (CSB’s) response to the EPA’s July 31, 2014 Request for Information (at 79 Fed. Reg. 44604) on potential revisions to its Risk Management Program regulations and program," 29 October 2014. [Online]. Available: https://www.csb.gov/assets/1/6/epa_rfi2.pdf. [Accessed 3 October 2018]. [32] U.S. Chemical Safety and Hazard Investigation Board (USCSB), "CSB’s response to the EPA’s March 14, 2016 Proposed Rule, “Accidental Release Prevention Requirements: Risk Management Programs Under the Clean Air Act, Section 112(r)(7)” (Docket No. EPA-HQ-QEM-2015-0725)," 10 May 2016. [Online].

  Page  131    

La  Porte,  Texas  |  Incident  Date:  November  15,  2014  |  No.  2015-­01-­I-­TX   U.S.  Chemical  Safety  and   Hazard  Investigation  Board   Toxic  Chemical  Release  at  the   DuPont  La  Porte  Chemical  Facility   Available: https://www.csb.gov/assets/1/6/csb_comments_epa-hq-oem-2015-0725_51020161.pdf. [Accessed 3 October 2018]. [33] U.S. Chemical Safety and Hazard Investigation Board (USCSB), "Drivers of Critical Chemical Safety Change," [Online]. Available: https://www.csb.gov/recommendations/mostwanted/. [Accessed 29 June 2017]. [34] U.S. Environmental Protection Agency (USEPA), "Risk Management Plan (RMP) Delay Rule Vacatur," [Online]. Available: https://www.epa.gov/rmp/risk-management-plan-rmp-delay-rule-vacatur. [Accessed 15 October 2018]. [35] U.S. Environmental Protection Agency (USEPA), "Proposed Risk Management Program (RMP) Reconsideration Rule," [Online]. Available: https://www.epa.gov/rmp/proposed-risk-management-program- rmp-reconsideration-rule. [Accessed 26 February 2019]. [36] Chemtrec, "History," [Online]. Available: https://www.chemtrec.com/about-chemtrec/who-we-are/history. [Accessed 3 October 2018]. [37] American Chemistry Council, "About the American Chemistry Council," [Online]. Available: https://www.americanchemistry.com/About/. [Accessed 2 November 2017]. [38] American Chemistry Council, "Responsible Care Program Elements," [Online]. Available: https://responsiblecare.americanchemistry.com/ResponsibleCare/Responsible-Care-Program-Elements.aspx. [Accessed 06 Oct 2017]. [39] Chemistry Industry Association of Canada, "A Brief History of Responsible Care," [Online]. Available: https://web.archive.org/web/20180610195147/http://www.canadianchemistry.ca/responsible_care/index.php/ en/responsible-care-history. [Accessed 10 Oct 2017]. [40] American Chemistry Council, "30 Years Responsible Care: Milestones and Achievements," 2018. [Online]. Available: https://responsiblecare.americanchemistry.com/rc/media/30-Years-Responsible-Care-Milestones- Achievements.pdf. [41] American Chemistry Council, "Responsible Care Management System: Technical Specification," 1 May

  1. [Online]. Available: https://responsiblecare.americanchemistry.com/Responsible-Care-Program-

Elements/Management-System-and-Certification/RCMS-Technical-Specifications.pdf. [42] American Chemistry Council, "Responsible Care Third-Party Audit Requirement Requirements for ACC Members and Responsible Care Partners," October 2017. [Online]. Available: https://responsiblecare.americanchemistry.com/Program-Elements/Management-System-and- Certification/RC501.pdf. [Accessed 29 March 2018].

  Page  132  

La  Porte,  Texas  |  Incident  Date:  November  15,  2014  |  No.  2015-­01-­I-­TX   U.S.  Chemical  Safety  and   Hazard  Investigation  Board   Toxic  Chemical  Release  at  the   DuPont  La  Porte  Chemical  Facility   [43] American Chemistry Council , "Responsible Care Guiding Principles," [Online]. Available: https://responsiblecare.americanchemistry.com/Responsible-Care-Program-Elements/Guiding- Principles/PDF-Responsible-Care-Guiding-Principles.pdf. [Accessed 2 March 2018]. [44] Amercian Chemistry Council, "Responsible Care Process Safety Code of Management Practices," 9 November 2012. [Online]. Available: https://responsiblecare.americanchemistry.com/Responsible-Care- Program-Elements/Process-Safety-Code/Responsible-Care-Process-Safety-Code-PDF.pdf. [Accessed 26 March 2018]. [45] American Chemistry Council and National Association of Chemical Distributors, "A Comparison of ACC Responsible Care and NACD Responsible Distribution Initiatives," 2015. [Online]. Available: https://www.nacd.com/pub/?id=35145BAD-93AE-F152-9978-FD6AE231C5F8. [Accessed 27 May 2019]. [46] American Chemistry Council, "Accountability & Impacts," [Online]. Available: https://responsiblecare.americanchemistry.com/AccountabilityandImpacts.html. [Accessed 20 November 2018]. [47] American Chemistry Council, "Process Safety Code," [Online]. Available: https://responsiblecare.americanchemistry.com/Process-Safety-Code/. [Accessed 30 May 2019]. [48] American Chemistry Council, "American Chemistry Council Letter to Center for Effective Government," 16 October 2015. [Online]. Available: https://www.foreffectivegov.org/sites/default/files/blowing-smoke/acc- response.pdf. [Accessed 10 December 2017]. [49] American Petroleum Institute (API), API Recommended Practice 754 - Process Safety Indicators for the Refining and Petrochemical Industries, 2016. [50] Centers for Disease Control and Prevention, "NIOSH Pocket Guide to Chemical Hazards: Methyl mercaptan," 11 April 2016. [Online]. Available: https://www.cdc.gov/niosh/npg/npgd0425.html. [Accessed 29 June 2017]. [51] U.S. Department of Labor (USDOL) Occupational Safety and Health Administration (OSHA), "Methyl Mercaptan," [Online]. Available: https://www.osha.gov/chemicaldata/chemResult.html?recNo=560. [Accessed 2 March 2018]. [52] Center for Chemical Process Safety (CCPS), Guidelines for Risk Based Process Safety, Hoboken, NJ: Wiley, 2007. [53] J. A. Klein, "Two Centuries of Process Safety at DuPont," Process Safety Progress, vol. 28, no. 2, pp. 114- 122, June 2009.

  Page  133    

La  Porte,  Texas  |  Incident  Date:  November  15,  2014  |  No.  2015-­01-­I-­TX   U.S.  Chemical  Safety  and   Hazard  Investigation  Board   Toxic  Chemical  Release  at  the   DuPont  La  Porte  Chemical  Facility   [54] DuPont Sustainable Solutions, "Quick 4-Step Review of Process Safety Management," [Online]. Available: http://www2.dupont.com/DuPont_Sustainable_Solutions/en_US/assets/downloads/Quick_4- Step_Review_Sheet.pdf. [Accessed 25 September 2018]. [55] DuPont Sustainable Solutions, "Developing a Robust PSM Framework at DuPont," February 2013. [Online]. Available: http://ips.se/files/pages/59/ips-david-guss-dupont-februari-2013.pdf. [Accessed 7 September 2018]. [56] Center for Chemical Process Safety (CCPS), Essential Practices for Creating, Strengthening, and Sustaining Process Safety Culture, Hoboken, NJ: John Wiley & Sons, Inc., 2018. [57] U.S. Chemical Safety and Hazard Investigation Board (USCSB), "CSB Urgent Recommendation BP Global Executive Board of Directors," 17 August 2005. [Online]. Available: https://www.csb.gov/assets/1/20/bp_recs.pdf?13851. [58] Baker Panel, "The Report of The BP U.S. Refineries Independent Safety Review Panel," January 2007. [Online]. Available: https://www.csb.gov/assets/1/20/baker_panel_report1.pdf?13842. [Accessed 27 December 2017]. [59] DuPont, "Relative Culture Strength: A Key to Sustainable World-Class Safety Performance," 2011. [Online]. Available: http://www.dupont.com/content/dam/dupont/products-and-services/consulting-services- and-process-technologies/consulting-services-and-process-technologies- landing/documents/Sustainable_World-Class_Safety_Performance.pdf. [60] U.S. Chemical Safety and Hazard Investigation Board (USCSB), "Investigation Report: Refinery Explosion and Fire: BP, Texas City, March 23, 2005," March 2007. [Online]. Available: https://www.csb.gov/bp- america-refinery-explosion/. [Accessed 27 December 2017]. [61] U.S. Chemical Safety and Hazard Identification Board (USCSB), "Investigation Report Volume 3: Drilling Rig Explosion and Fire at the Macondo Well," 17 April 2016. [Online]. Available: https://www.csb.gov/macondo-blowout-and-explosion/. [Accessed 29 May 2019]. [62] U.S. Chemical Safety and Hazard Investigation Board (USCSB), "Tesoro Martinez Refinery: Process Safety Culture Case Study: Martinez, California: February 12, 2014 and March 10, 2014 Sulfuric Acid Release Incidents," 2016. [Online]. Available: https://www.csb.gov/assets/1/20/tesoro_martinez_final_case_study1.pdf?15674. [Accessed 19 February 2017]. [63] Center for Chemical Process Safety (CCPS), Conduct of Operations and Operational Discipline-For Improving Process Safety in Industry, Hoboken, New Jersey: CCPS/John Wiley & Sons, Inc., 2011.

  Page  134  

La  Porte,  Texas  |  Incident  Date:  November  15,  2014  |  No.  2015-­01-­I-­TX   U.S.  Chemical  Safety  and   Hazard  Investigation  Board   Toxic  Chemical  Release  at  the   DuPont  La  Porte  Chemical  Facility   [64] D. A. Wiegmann, H. Zhang, T. L. von Thaden, G. Sharma and A. M. Gibbons, "Safety Culture: An Integrative Review," The International Journal of Aviation Psychology, vol. 14, no. 2, pp. 117-134, 2004. [65] Contra Costa Health Services, "Industrial Safety Ordinance Guidance Document, Section F-Safety Culture Assessments," 15 June 2011. [Online]. Available: http://cchealth.org/hazmat/pdf/iso/section_f.pdf. [Accessed 11 01 2018]. [66] Center for Chemical Process Safety (CCPS), Guidelines for Auditing Process Safety Management Systems, New York, New York: Wiley, 2011. [67] A. Hopkins, "Why Safety Cultures Don't Work," [Online]. Available: http://www.futuremedia.com.au/docs/Why_Safety_Cultures_Don't_Work.pdf. [Accessed 26 September 2018]. [68] DuPont, "DuPont Process Safety Management," [Online]. Available: http://www2.dupont.com/DuPont_Safety_Resources/en_SG/assets/downloads/PSM%20Brochure.pdf. [Accessed 26 September 2018]. [69] J. A. Klein, "A Revised Program for Operational Discipline," Process Safety Progress, vol. 27, no. 1, pp. 58- 65, March 2008. [70] Center for Chemical Process Safety (CCPS), Guidelines for Auditing Process Safety Management Systems, Hoboken: Wiley, 2011. [71] U.S. Chemical Safety and Hazard Identifcation Board (USCSB), "Williams Geismar Olefins Plant: Reboiler Rupture and Fire: Geismar, Louisiana," 2013. [Online]. Available: https://www.csb.gov/williams-olefins- plant-explosion-and-fire-/. [Accessed 29 May 2019]. [72] A. H. a. R. D. Mohammadi, "Equilibrium Data of Sulfur Dioxide and Methyl Mercaptan Clathrate Hydrates," Journal of Chemical & Engineering Data, vol. 56, pp. 1666-1668, 2011. [73] Georgia Tech Applied Research Corporation, "Process Safety Management of Highly Hazardous & Explosive Chemicals Module 4: PSM Standard Operating Procedures," [Online]. Available: https://www.osha.gov/harwoodgrants/grantmaterials/fy2008/sh-17811-08. [Accessed 29 5 2019]. [74] K. W. Morrison, "What's your reward? The debate over incentive programs," 1 April 2011. [Online]. Available: http://www.safetyandhealthmagazine.com/articles/5501-whats-your-reward. [Accessed 10 January 2018]. [75] U.S. Department of Labor (USDOL) Occupational Safety and Health Administration (OSHA), "Employer Safety Incentive and Disincentive Policies and Practices," 12 March 2012. [Online]. Available: https://www.osha.gov/as/opa/whistleblowermemo.html. [Accessed 2015].

  Page  135    

La  Porte,  Texas  |  Incident  Date:  November  15,  2014  |  No.  2015-­01-­I-­TX   U.S.  Chemical  Safety  and   Hazard  Investigation  Board   Toxic  Chemical  Release  at  the   DuPont  La  Porte  Chemical  Facility   [76] U.S. Department of Labor (USDOL) Occupational Safety and Health Administration (OSHA), "Clarification of OSHA’s Position on Workplace Safety Incentive Programs and Post-Incident Drug Testing Under 29 C.F.R. § 1904.35(b)(1)(iv)," 11 October 2018. [Online]. Available: https://www.osha.gov/laws- regs/standardinterpretations/2018-10-11. [Accessed 26 October 2018]. [77] DuPont Sustainable Solutions, "The DuPont Bradley Curve (video)," 5 November 2015. [Online]. Available: https://www.youtube.com/watch?v=tMoVi7vxkb0. [Accessed 17 November 2017]. [78] DuPont, "DuPont Bradley Curve," 2017. [Online]. Available: http://www.dupont.com/products-and- services/consulting-services-process-technologies/brands/sustainable-solutions/sub-brands/operational-risk- management/uses-and-applications/bradley-curve.html. [Accessed 17 November 2017]. [79] Center for Chemical Process Safety (CCPS), in RECOGNIZING CATASTROPHIC INCIDENT WARNING SIGNS IN THE PROCESS INDUSTRIES, Hoboken, New Jersey: Wiley, 2012. [80] Agency for Toxic Substances and Disease Registry (ATSDR), "Methyl Mercaptan," [Online]. Available: https://www.atsdr.cdc.gov/MHMI/mmg139.pdf. [Accessed 29 June 2017]. [81] Center for Chemical Process Safety (CCPS), Guidelines for Fire Protection in Chemical, Petrochemical, and Hydrocarbon Processing Facilities, New York, New York: American Institute of Chemical Engineers, 2003. [82] American Industrial Hygiene Association (AIHA), "Current ERPG Values," 2014. [Online]. Available: https://www.aiha.org/get- involved/AIHAGuidelineFoundation/EmergencyResponsePlanningGuidelines/Documents/2014%20ERPG% 20Values.pdf. [83] DowDuPont, "About DowDuPont," 2017. [Online]. Available: http://www.dow-dupont.com/about-dow- dupont/default.aspx. [Accessed 6 Oct 2017]. [84] RAE Systems by Honeywell, "Technical Note TN-156, Correction Factors for Combustible Gas (LEL) Sensors," [Online]. Available: http://www.raesystems.com/sites/default/files/content/resources/Technical%20Note%20156%20Correction %20Factors%20For%20Combustible%20Gas%20LEL%20Sensorsnr%2002%2016.pdf. [Accessed 06 Oct 2017]. [85] I. Sutton, Plant Design and Operations, 2nd ed., Cambridge, MA: Gulf Professional Publishing, 2017. [86] F. Cavender, S. Phillips and M. Holland, "Development of Emergency Response Planning Guidelines (ERPGs)," Journal of Medical Toxicology, vol. 4, no. 2, pp. 127-131, June 2008.

  Page  136  

La  Porte,  Texas  |  Incident  Date:  November  15,  2014  |  No.  2015-­01-­I-­TX   U.S.  Chemical  Safety  and   Hazard  Investigation  Board   Toxic  Chemical  Release  at  the   DuPont  La  Porte  Chemical  Facility   [87] American Chemistry Council, "ACC Responsible Care Management System and Certification Overview," 18 March 2003. [Online]. Available: https://texasiof.ceer.utexas.edu/texasshowcase/pdfs/presentations/b5/bstutts.pdf. [Accessed 10 Oct 2017]. [88] International Council of Chemical Associations, "2015 Responsible Care Status Report," [Online]. Available: https://www.icca-chem.org/wp-content/uploads/2015/09/2015-Responsible-Care-Status- Report.pdf. [Accessed 2 November 2017]. [89] International Council of Chemical Associations, "Responsible Care: The Quest for Performance Excellence," [Online]. Available: https://www.icca-chem.org/responsible-care/. [90] M. Speegle, Safety, Health, and Environmental Concepts for the Process Industry, 2nd ed., New York: Delmar, 2013, p. 58. [91] W. L. Frank, "Process safety culture in the CCPS risk based process safety model," Process Safety Progress, vol. 26, no. 3, pp. 203-208, September 2007. [92] American Chemistry Council, "Responsible Care Third-Party Audit Requirement," 10 2017. [Online]. Available: https://responsiblecare.americanchemistry.com/Program-Elements/Management-System-and- Certification/RC501.pdf. [Accessed 6 12 2017]. [93] CCOHS, "Methylene Chloride," 3 January 2017. [Online]. Available: http://www.ccohs.ca/oshanswers/chemicals/chem_profiles/methylene.html. [Accessed 9 December 2017]. [94] DuPont, "DuPont Lannate SP Insecticide," 14 1 2016. [Online]. Available: http://www.dupont.ca/content/dam/dupont/tools-tactics/crop/canada-label-msds/documents/cp_PSD- 68_Lannate_130000000505_20160114_MSDS_E.pdf. [Accessed 14 12 2017]. [95] U.S. National Library of Medicine, "Haz-Map Methyl Mercaptan," [Online]. Available: https://hazmap.nlm.nih.gov/category-details?id=192&table=copytblagents. [Accessed 14 12 2017]. [96] P. Hasenmeier, "The History of Firefighter Personal Protective Equipment," Fire Engineering , 6 6 2008. [Online]. Available: http://www.fireengineering.com/articles/2008/06/the-history-of-firefighter-personal- protective-equipment.html. [Accessed 14 12 2017]. [97] The Pro Board, "The Pro Board," [Online]. Available: http://www.theproboard.org/. [Accessed 15 12 2017]. [98] National Fire Protection Association (NFPA), "NFPA 1911: Standard for the Inspection, Maintenance, Testing, and Retirement of In-Service Emergency Vehicles," 2012. [Online]. Available: http://www.nfpa.org/codes-and-standards/all-codes-and-standards/list-of-codes-and- standards/detail?code=1911&year=2012. [Accessed 28 December 2017]. [99] SAFER Systems, "SAFER Trace," [Online]. Available: https://www.safersystem.com/products/safer-trace/. [Accessed 29 December 2017].

  Page  137    

La  Porte,  Texas  |  Incident  Date:  November  15,  2014  |  No.  2015-­01-­I-­TX   U.S.  Chemical  Safety  and   Hazard  Investigation  Board   Toxic  Chemical  Release  at  the   DuPont  La  Porte  Chemical  Facility   [100] Weather Underground, "Ellington Field, TX," [Online]. Available: https://www.wunderground.com/history/airport/KEFD/2018/1/8/DailyHistory.html?cm_ven=localwx_histor y. [Accessed 08 01 2018]. [101] American Society of Mechanical Engineers (ASME), Boiler & Pressure Vessel Code, VIII Rules for Construction of Pressure Vessels, Division 1, 2013. [102] American Petroleum Institute (API), API 521 - Pressure-relieving and Depressuring Systems, 6th ed., 2014. [103] National Fire Protection Association (NFPA), "NFPA 600: Standard on Facility Fire Brigades," 2015. [Online]. Available: http://www.nfpa.org/codes-and-standards/all-codes-and-standards/list-of-codes-and- standards/detail?code=600. [Accessed 29 December 2017]. [104] American Chemistry Council, "Safety," [Online]. Available: https://responsiblecare.americanchemistry.com/ResponsibleCare/Performance-Results/Safety/. [Accessed 29 March 2018]. [105] Dow, "DowDuPont Merger Successfully Completed," 1 September 2017. [Online]. Available: https://www.dow.com/en-us/news/press-releases/dowdupont-merger-successfully-completed. [Accessed 4 April 2018]. [106] National Fire Protection Association (NFPA), "NFPA 1: Fire Code," 2018. [Online]. Available: https://www.nfpa.org/codes-and-standards/all-codes-and-standards/list-of-codes-and- standards/detail?code=1. [Accessed 12 April 2018]. [107] DuPont, "DuPont Completes Spin-off of The Chemours Company," 1 July 2015. [Online]. Available: http://www.dupont.com/corporate-functions/media-center/press-releases/dupont-completes-spin-off-of-the- chemours-company.html. [Accessed 1 May 2018]. [108] Chemours, "Creating Higher Value Chemistry: The Chemours Company 2015 Annual Report," [Online]. Available: https://s21.q4cdn.com/411213655/files/doc_financials/annual_reports/Chemours-2015-Annual- Report.pdf. [Accessed 1 May 2018]. [109] Center for Chemical Process Safety (CCPS), Inherently Safer Chemical Processes - A Life Cycle Approach, 2nd ed., New York: John Wiley & Sons, Inc., 2009. [110] Center for Chemical Process Safety (CCPS), "Emergency Relief Device," [Online]. Available: https://www.aiche.org/ccps/resources/glossary/process-safety-glossary/emergency-relief-device. [Accessed 7 May 2018]. [111] Eastman Chemical Company, "An Overview of Pressure Relief Devices," 16 September 2014. [Online]. Available: https://www.google.com/url?sa=t&rct=j&q=&esrc=s&source=web&cd=5&ved=0ahUKEwj1q5yO9fXaAhU

  Page  138  

La  Porte,  Texas  |  Incident  Date:  November  15,  2014  |  No.  2015-­01-­I-­TX   U.S.  Chemical  Safety  and   Hazard  Investigation  Board   Toxic  Chemical  Release  at  the   DuPont  La  Porte  Chemical  Facility   C_4MKHesZAFcQFghVMAQ&url=https%3A%2F%2Fwww.aiche.org%2Fsites%2Fdefault%2Ffiles%2Fco mmunity%2F160956%2Faiche-community-site-files%2F198496%2Faichemeeting9162014.pptx&us. [112] S. S. Murnane, A. H. Lehocky and P. D. Owens, Odor Thresholds for Chemicals with Established Occupational Health Standards, 2nd ed., Falls Church, Virginia: American Industrial Hygiene Association (AIHA), 2013. [113] Chemical Processing, "DuPont Sustainable Solutions Celebrates 50th With Global Panel Series," 13 April

  1. [Online]. Available: https://www.chemicalprocessing.com/industrynews/2018/dupont-sustainable-

solutions-celebrates-50th-with-global-panel-series-2/. [Accessed 6 September 2018]. [114] DuPont Sustainable Solutions, "DuPont Sustainable Solutions," [Online]. Available: http://www.dupont.com/products-and-services/consulting-services-process-technologies/brands/about- us.html. [Accessed 6 September 2018]. [115] National Safety Council, "Robert W. Campbell Award," [Online]. Available: https://www.campbellaward.org/winners/. [Accessed 6 September 2018]. [116] DuPont Sustainable Solutions , "Felt Leadership Workshop," [Online]. Available: https://www.training.dupont.com/safety-workshops/felt-leadership. [Accessed 18 September 2018]. [117] DuPont Sustainable Solutions, "DuPont Sustainable Solutions Can Help Create Lasting Improvements to Your Process Safety Management Systems," [Online]. Available: http://www2.dupont.com/Sustainable_Solutions/en_US/assets/downloads/psm_infographic/PSMOverview_ SustainableImprovements.pdf. [Accessed 26 September 2018]. [118] DuPont Sustainable Solutions, "Developing a Robust PSM Framework at DuPont," February 2013. [Online]. Available: http://ips.se/files/pages/59/ips-david-guss-dupont-februari-2013.pdf. [Accessed 26 September 2018]. [119] ICIS, "US CMA Changing Name to American Chemistry Council," 09 Jun 2000. [Online]. Available: https://www.icis.com/resources/news/2000/06/09/114009/us-cma-changing-name-to-american-chemistry- council/. [Accessed 30 June 2017]. [120] Code Red Safety, "High Angle Resccue," [Online]. Available: https://coderedsafety.com/rescue- services/high-angle-rescue/. [Accessed 4 October 2018]. [121] U.S. Chemical Safety and Hazard Investigation Board (USCSB), "Investigation Report: E.I. DuPont DE Nemours & Co. Inc.: Belle, West Virginia," September 2011. [Online]. Available: https://www.csb.gov/assets/1/20/csb%20final%20report.pdf?13966.

  Page  139    

La  Porte,  Texas  |  Incident  Date:  November  15,  2014  |  No.  2015-­01-­I-­TX   U.S.  Chemical  Safety  and   Hazard  Investigation  Board   Toxic  Chemical  Release  at  the   DuPont  La  Porte  Chemical  Facility   [122] U.S. Chemical Safety and Hazard Investigation Board (USCSB), "Case Study: E.I. DuPont de Nemours & Co Inc.: Buffalo, New York," [Online]. Available: https://www.csb.gov/e-i-dupont-de-nemours-co-fatal- hotwork-explosion/. [123] RAE Systems, "MultiRAE," [Online]. Available: https://www.raesystems.com/products/multirae. [Accessed 23 October 2018]. [124] RAE Systems, "QRAE 3," [Online]. Available: http://www.raesystems.com/products/qrae-3. [Accessed 15 12 2017]. [125] Drager, "Drager-Tubes & accuro-Pump," [Online]. Available: https://www.draeger.com/Products/Content/tubes-accuro-pump-pi-us.pdf. [Accessed 06 Oct 2017]. [126] American Chemistry Council, "www.regulations.gov," 13 May 2016. [Online]. Available: https://www.regulations.gov/document?D=EPA-HQ-OEM-2015-0725-0537. [Accessed 4 December 2017]. [127] American Chemistry Council, "Safety," [Online]. Available: https://responsiblecare.americanchemistry.com/ResponsibleCare/Performance-Results/Safety/. [Accessed 29 10 2018]. [128] American Chemistry Council, "Security Code," [Online]. Available: https://responsiblecare.americanchemistry.com/Security-Code/. [Accessed 6 November 2018]. [129] American Chemistry Council, "Product Safety Code," [Online]. Available: https://responsiblecare.americanchemistry.com/Product-Safety-Code/. [Accessed 6 November 2018]. [130] National Center for Biotechnology Information, "Acute Exposure Guideline Levels for Selected Airborne Chemicals: Volume 15: 2. Methyl Mercaptan Acute Exposure Guideline Levels," [Online]. Available: https://www.ncbi.nlm.nih.gov/books/NBK201324/. [Accessed 14 November 2018]. [131] I. Sutton, Plant Design and Operations, Ashland: Elsevier, 2017. [132] USFEMA, "National Incident Management System," [Online]. Available: https://www.fema.gov/national- incident-management-system. [Accessed 21 February 2019]. [133] Oxford Dictionary, "Oleum," [Online]. Available: https://en.oxforddictionaries.com/definition/oleum. [Accessed 18 March 2019]. [134] DowDuPont, "DowDuPont," [Online]. Available: http://www.dow-dupont.com/home/default.aspx. [Accessed 26 April 2019]. [135] M. P. Bailey, "DuPont's Sustainable Solutions Business to Become Independent Consulting Firm," Chemical Engineering Essentials for the CPI Professional, 19 February 2019. [Online]. Available:

  Page  140  

La  Porte,  Texas  |  Incident  Date:  November  15,  2014  |  No.  2015-­01-­I-­TX   U.S.  Chemical  Safety  and   Hazard  Investigation  Board   Toxic  Chemical  Release  at  the   DuPont  La  Porte  Chemical  Facility   https://www.chemengonline.com/duponts-sustainable-solutions-business-to-become-independent- consulting-firm/. [Accessed 26 April 2019]. [136] National Fire Protection Association (NFPA), "NFPA 497: Recommended Practice for the Classification of Flammable Liquids, Gases, or Vapors and of Hazardous (Classified) Locations for Electrical Installations in Chemical Process Areas," 2017. [Online]. Available: https://www.nfpa.org/codes-and-standards/all-codes- and-standards/list-of-codes-and-standards/detail?code=497. [Accessed 29 May 2019]. [137] U.S. Chemical Safety and Hazard Investigation Board (USCSB), "Docket No. EPA-HQ-OEM-2015-0725, Accidental Release Prevention," 20 July 2018. [Online]. Available: https://www.csb.gov/assets/1/6/csb_comments_epa_rmp_20180720.pdf. [Accessed 17 October 2018]. [138] U.S. Chemical Safety and Hazard Investigation Board (USCSB), "Board Order 22: Recommendations Program," [Online]. Available: https://www.csb.gov/assets/record/csb_board_order_022_final_20161.pdf. [139] U.S. Chemical Safety and Hazard Investigation Board (USCSB), "Board Order 40: Investigation Program," [Online]. Available: https://www.csb.gov/assets/record/board_order_040_approved_2_14_17.pdf. [140] U.S. Chemical Safety and Hazard Investigation Board (USCSB), "BP American Refinery Explosion," [Online]. Available: https://www.csb.gov/bp-america-refinery-explosion/. [Accessed 15 May 2018]. [141] U.S. Chemical Safety and Hazard Investigation Board (USCSB), "CSB Letter to EPA: Re: Docket Number EPA-HQ-OAR-2010-0682," 28 October 2014. [Online]. Available: http://www.csb.gov/assets/1/7/EPA_Proposed_Rule_(Refineries)_10-28-2014.pdf. [142] U.S. Chemical Safety and Hazard Investigation Board (USCSB), "CSB Letter to PHMSA: Attention: Docket No. PHMSA-2014-0099; Notice No. 14-11," 3 October 2014. [Online]. Available: https://www.csb.gov/assets/1/6/dot_erg__rfi10_1_1411.pdf. [Accessed 23 October 2018]. [143] U.S. Chemical Safety and Hazard Investigation Board (USCSB), "Docket No. EPA-HQ-OEM-2015-0725, Accidental Release Prevention Requirements: Risk Management Programs Unde the Clean Air Action, Section 112(r)(7)," 10 May 2016. [Online]. Available: https://www.csb.gov/assets/1/6/csb_comments_epa- hq-oem-2015-0725_51020161.pdf. [Accessed 17 October 2018]. [144] U.S. Chemical Safety and Hazard Investigation Board (USCSB), "Final Investigation Report: E.I. DuPont de Nemours & Co., Inc. Belle, West Virginia," September 2011. [Online]. Available: https://www.csb.gov/assets/1/20/csb%20final%20report.pdf?13966. [Accessed 7 October 2018]. [145] U.S. Chemical Safety and Hazard Investigation Board (USCSB), "Investigation Report Volume 3: Drilling Rig Explosion and Fire at the Macondo Well," 17 April 2016. [Online]. Available: https://www.csb.gov/macondo-blowout-and-explosion/. [Accessed 27 March 2018].

  Page  141    

La  Porte,  Texas  |  Incident  Date:  November  15,  2014  |  No.  2015-­01-­I-­TX   U.S.  Chemical  Safety  and   Hazard  Investigation  Board   Toxic  Chemical  Release  at  the   DuPont  La  Porte  Chemical  Facility   [146] U.S. Chemical Safety and Hazard Investigation Board (USCSB), "Investigation Report: Explosion and Fire: First Chemical Corporation," October 2003. [Online]. Available: https://www.csb.gov/assets/1/20/first_report.pdf?13794. [147] U.S. Chemical Safety and Hazard Investigation Board (USCSB), "Recommendations Status Change Summary: 2010-6-I-WV-R14," 10 April 2013. [Online]. Available: https://www.csb.gov/assets/recommendation/status_change_summary_dupont_corporate_r14.pdf. [Accessed 10 October 2018]. [148] U.S. Chemical Safety and Hazard Investigation Board (USCSB), "Reflections on Bhopal after Thirty Year," 1 December 2014. [Online]. Available: http://www.csb.gov/videos/reflections-on-bhopal-after-thirty-years/. [Accessed 2 November 2017]. [149] U.S. Department of Labor (USDOL) Occupational Safety and Health Administration (OSHA), "Permissible Exposure Limits – Annotated Tables," [Online]. Available: https://www.osha.gov/dsg/annotated-pels/. [Accessed 9 May 2018]. [150] Center for Chemical Process Safety (CCPS), "CCPS Process Safety Glossary- Safe Work Practices," [Online]. Available: https://www.aiche.org/ccps/resources/glossary/process-safety-glossary/safe-work- practices. [Accessed 1 February 2017]. [151] U.S. Environmental Protection Agency (USEPA), "Chapter 8: Emergency Response Program," [Online]. Available: https://www.epa.gov/rmp/general-rmp-guidance-chapter-8-emergency-response-program. [Accessed 14 May 2018]. [152] U.S. Environmental Protection Agency (USEPA), "General Guidance on Risk Management Programs for Chemical Accident Prevention (40 CFR Part 68): Chapter 2: Applicability of Program Levels," [Online]. Available: https://www.epa.gov/sites/production/files/2013-10/documents/chap-02-final.pdf. [Accessed 3 October 2018]. [153] U.S. Environmental Protection Agency (USEPA), "Petroleum Refinery Fenceline Monitoring Stakeholder Engagement Webinar," 22 6 2016. [Online]. Available: https://www.epa.gov/sites/production/files/2016- 06/documents/state_local_tribal_webinar_june_2016.pdf. [Accessed 19 12 2017]. [154] U.S. Environmental Protection Agency (USEPA), "Petroleum Refinery Sector Risk and Technology Review and New Source Performance Standards (NSPS)," [Online]. Available: https://www.epa.gov/stationary- sources-air-pollution/petroleum-refinery-sector-risk-and-technology-review-and-new-source. [Accessed 19 12 2017]. [155] U.S. Department of Labor (USDOL) Occupational Safety and Health Administration (OSHA), "Citation and Notification of Penalty- Inspection Number: 1019650," 9 July 2015. [Online]. Available: https://www.osha.gov/ooc/citations/EIDuPontDeNemoursCo_1019650.pdf. [Accessed 21 February 2019].

  Page  142  

La  Porte,  Texas  |  Incident  Date:  November  15,  2014  |  No.  2015-­01-­I-­TX   U.S.  Chemical  Safety  and   Hazard  Investigation  Board   Toxic  Chemical  Release  at  the   DuPont  La  Porte  Chemical  Facility   [156] U.S. Department of Labor (USDOL) Occupational Safety and Health Administration (OSHA), "Hazard Communication 2012 - The Revised Standard and What Changes You Can Expect in the Workplace," 13 8

  1. [Online]. Available:

https://www.osha.gov/dsg/hazcom/schc_alliance_webinar_20120809/schc_alliance_webinar_20120809.pptx . [Accessed 19 12 2017]. [157] U.S. Department of Labor (USDOL) Occupational Safety and Health Administration (OSHA), "Inspection Detail: 1019650.015," [Online]. Available: https://www.osha.gov/pls/imis/establishment.inspection_detail?id=1019650.015. [Accessed 21 February 2019]. [158] U.S. Department of Labor (USDOL) Occupational Safety and Health Administration (OSHA), "Interpretation of 1904.35(b)(1)(i) and (iv)," 19 October 2016. [Online]. Available: https://www.osha.gov/recordkeeping/finalrule/interp_recordkeeping_101816.html. [Accessed 1 December 2017]. [159] U.S. Department of Labor (USDOL) Occupational Safety and Health Administration (OSHA), "OSHA Annotated Table Z-1," [Online]. Available: https://www.osha.gov/dsg/annotated-pels/tablez-1.html. [Accessed 9 May 2018]. [160] U.S. Department of Labor (USDOL) Occupational Safety and Health Administration (OSHA), "OSHA News Release - Region 6," 9 July 2015. [Online]. Available: https://www.osha.gov/news/newsreleases/region6/07092015. [Accessed 29 June 2017]. [161] U.S. Department of Labor (USDOL) Occupational Safety and Health Administration (OSHA), "OSHA: Inspection Detail 1008319.015," [Online]. Available: https://www.osha.gov/pls/imis/establishment.inspection_detail?id=1008319.015. [Accessed 21 February 2019]. [162] U.S. Department of Labor (USDOL) Occupational Safety and Health Administration (OSHA), "Permissible Exposure Limits - Annotated Tables," [Online]. Available: https://www.osha.gov/dsg/annotated-pels/. [Accessed 27 December 2017]. [163] U.S. Department of Labor (USDOL) Occupational Safety and Health Administration (OSHA), "Permissible Exposure Limits / OSHA Annotated Table Z-1," 2017. [Online]. Available: https://www.osha.gov/dsg/annotated-pels/tablez-1.html. [Accessed 27 December 2017]. [164] U.S. Department of Labor (USDOL) Occupational Safety and Health Administration (OSHA), "Proper protections could have saved four DuPont workers killed by gas," 14 May 2015. [Online]. Available: https://www.osha.gov/news/newsreleases/region6/05142015. [Accessed 21 February 2019]. [165] U.S. Federal Emergency Management Agency (USFEMA), "Risk-Based A Principal in Emergency Management," [Online]. Available:

  Page  143    

La  Porte,  Texas  |  Incident  Date:  November  15,  2014  |  No.  2015-­01-­I-­TX   U.S.  Chemical  Safety  and   Hazard  Investigation  Board   Toxic  Chemical  Release  at  the   DuPont  La  Porte  Chemical  Facility   https://training.fema.gov/hiedu/docs/principlesofem/principles%20of%20em%20-%20session%205%20- %20risk-based.ppt. [Accessed 9 May 2018]. [166] U.S. Department of Labor (USDOL) Occupational Safety and Health Administration (OSHA), "The Whistleblower Protection Programs," [Online]. Available: https://www.whistleblowers.gov/. [Accessed 12 April 2019]. [167] National Oceanic Atmospheric Association (NOAA), "Office of Response and Restoration: Emergency Response Planning Guidelines (ERPGs)," 29 June 2017. [Online]. Available: http://response.restoration.noaa.gov/oil-and-chemical-spills/chemical-spills/resources/emergency-response- planning-guidelines-erpgs.html. [168] U.S. Chemical Safety and Hazard Investigation Board (USCSB), "Safety Bulletin - Hazards of Nitrogen Asphyxiation," 6 2003. [Online]. Available: https://www.csb.gov/hazards-of-nitrogen-asphyxiation/. [Accessed 8 12 2017]. [169] Kuraray, "Corporate Overview," [Online]. Available: https://www.kuraray.com/company/overview. [Accessed 29 May 2019]. [170] American Chemistry Council, "Responsible Care: About," [Online]. Available: https://www.americanchemistry.com/Membership/MemberCompanies/. [Accessed 29 May 2019]. [171] U.S. Department of Labor Bureau of Labor Statistics, "Appendix C, Bulletin 2424: Occupational Injuries and Illnesses in the United States by Industry, 1991," May 1993. [Online]. Available: https://books.google.com/books?id=msRH9BUNUP0C&pg=PA75&lpg=PA75&dq=%22Incidence+rates+ca n+be+used+to+show+the+relative+level+of+injuries+and+illnesses+among+different+industries%22&sourc e=bl&ots=nnEiD8ko8E&sig=3rCxnPVa8dOykr8BAXCed4MKOs0&hl=en&sa=X&ved=0a. [Accessed 27 December 2017]. [172] National Fire Protection Association (NFPA), "NFPA 921: Guide for Fire & Explosion Investigations,"

  1. [Online]. Available: https://www.nfpa.org/codes-and-standards/all-codes-and-standards/list-of-codes-

and-standards/detail?code=921. [173] U.S. Chemical Safety and Hazard Identification Board (USCSB), "Safety Digest: Preparing Equipment and Instrumentation for Cold Weather Operations," September 2018. [Online]. Available: https://www.csb.gov/assets/1/6/csb_winterization_safety_digest.pdf. [Accessed 5 June 2019].

 

  Page  144  

La  Porte,  Texas  |  Incident  Date:  November  15,  2014  |  No.  2015-­01-­I-­TX   U.S.  Chemical  Safety  and   Hazard  Investigation  Board   Toxic  Chemical  Release  at  the   DuPont  La  Porte  Chemical  Facility   APPENDIX  A:  CAUSAL  ANALYSIS  

The AcciMapa (size 11" x 17") can be found at www.csb.gov on the DuPont La Porte investigation page.

 

a An AcciMap is a multilayered causal diagram that arranges the various causes of an accident in terms of their remoteness from the initiating events. This approach differs from other analysis techniques in that it identifies causes in all parts of the system, ranging from the physical sequence of events right up to causes at the governmental, regulatory, and societal levels. It is a CSB internal investigation procedure that is especially useful for developing broadly applicable recommendations for prevention.

  Page  145    

La  Porte,  Texas  |  Incident  Date:  November  15,  2014  |  No.  2015-­01-­I-­TX   U.S.  Chemical  Safety  and   Hazard  Investigation  Board   Toxic  Chemical  Release  at  the   DuPont  La  Porte  Chemical  Facility   APPENDIX  B:  INCIDENT  TIMELINE   Approximate Time Activity Wednesday, November 12, 2014

2:00–3:00 pm Operators attempt to restart the Lannate® process after a unit shutdown, but flow is not established because equipment is plugged. 3:00 pm Operators begin troubleshooting the Lannate® process to try to clear the plugging. Friday, November 14, 2014

10:00 am–3:02 am Methyl mercaptan is released outside and inside the manufacturing building while troubleshooting to clear the plugging continues. Detectors inside and outside the manufacturing building identify high levels of methyl mercaptan and trigger alarms 32 separate times. These alarms display only on the control panel (there are no building or exterior alarms). Operations personnel who are aware of the alarms and the troubleshooting do not perceive the leaks as posing a serious hazard (see Investigation Note below). Investigation Note Operations personnel likely normalized both the methyl mercaptan odor and the detector alarms. Personnel associated these methyl mercaptan leaks with the ongoing troubleshooting activities. Saturday, November 15, 2014 (Day of Incident)

2:51 am–2:54 am High pressure in equipment inside the manufacturing building triggers control system alarms. Operations personnel attribute the high pressure to a common long-standing problem with process condensate accumulating in the waste gas vent header piping. Unknown to the operations personnel, in this instance the high pressure is not caused by the typical process condensate accumulation. The high pressure is a symptom of a different problem: liquid methyl mercaptan flowing into the waste gas vent header piping, due to the piping alignment being used to clear the plugging during the troubleshooting efforts. 2:58 am–3:03 am Shift Supervisor and Operator 1 separately go to the third floor of the manufacturing building to try to reduce the equipment pressure. They plan to drain the equipment of what they believe is normal process condensate to reduce the high pressure—a long- standing practice used to reduce pressure in this equipment. 3:01 am–3:13 am Two drain valves on the waste gas vent header are manually opened on the third floor of the manufacturing building. Highly toxic and highly flammable liquid methyl mercaptan flows out of the valves, overcoming the Shift Supervisor.

  Page  146  

La  Porte,  Texas  |  Incident  Date:  November  15,  2014  |  No.  2015-­01-­I-­TX   U.S.  Chemical  Safety  and   Hazard  Investigation  Board   Toxic  Chemical  Release  at  the   DuPont  La  Porte  Chemical  Facility   3:13 am The second-floor chlorine detector records a value of -1. This type of detector is known to go negative when sensing methyl mercaptan (-1 parts per million chlorine indication ≈ 33 parts per million methyl mercaptan). 3:24 am–3:26 am Three methyl mercaptan detectors inside the manufacturing building (two on the first floor and one on the fourth floor) sense at least 25 parts per million methyl mercaptan, triggering alarms at the control panel. The Board Operator may see these alarms but does not realize a chemical release has begun, likely associating the alarms with process troubleshooting. His focus is on mitigating the equipment high-pressure event. 3:30 am Operator 1, who is likely on third floor of manufacturing building, makes an urgent distress call over the radio for help. Personnel do not know where Operator 1 is located or the type of emergency she is experiencing. Some DuPont La Porte personnel who hear her distress call interpret the communication to mean that Operator 1 has a personal injury—such as a broken leg. Personnel in the control room do not yet realize there is a toxic chemical release. 3:30 am Control room operator tries to get more information through radio communication, but neither the Shift Supervisor nor Operator 1 responds. 3:30 am – 3:40 am An operator (Operator 5) on the first floor of the manufacturing building is exposed to methyl mercaptan and experiences dizziness and blurry vision. He escapes from the manufacturing building, runs across the street, and lies down in the grass, where he starts to recover. 3:30 am Two operators (Operator 2 and Operator 3) in the control room run into the manufacturing building to respond to the distress call made by Operator 1. They do not realize they are responding to a serious toxic methyl mercaptan leak. They do not wear or take with them any respiratory protection. 3:30 am Operator 4, who is outside, sees Operator 2 and Operator 3 running into the manufacturing building and follows them. He also does not realize they are responding to a serious toxic methyl mercaptan leak. He does not wear or take with him any respiratory protection. Investigation Note No visual or audible alarms are installed inside the manufacturing building to warn operators in the field of the hazardous concentration of methyl mercaptan inside the manufacturing building. Operations personnel entering the manufacturing building responding to Operator 1’s distress call have no indication of a lethal methyl mercaptan concentration in the manufacturing building. 3:30–3:35 am Operator 2 enters the south stairway and likely goes directly to the third floor, where he is incapacitated by methyl mercaptan. 3:30–3:35 am Operator 3 goes up the stairs to the fourth floor but does not find anyone. 3:30–3:35 am Operator 4 goes up the stairs to the second floor. He walks about 10 feet and hits a “wall” of methyl mercaptan. He manages to retreat to the stairwell. 3:35 am Operator 3 announces on the unit’s public-address system that he does not see anyone on the fourth floor. The control operator responds that the Shift Supervisor and

  Page  147    

La  Porte,  Texas  |  Incident  Date:  November  15,  2014  |  No.  2015-­01-­I-­TX   U.S.  Chemical  Safety  and   Hazard  Investigation  Board   Toxic  Chemical  Release  at  the   DuPont  La  Porte  Chemical  Facility   Operator 1 may be on the third floor. Operator 3 begins to feel light-headed. He makes his way to the staircase and loses consciousness while descending the stairs from the fourth floor. 3:35 am The Board Operator attempts to reach the Shift Supervisor, Operator 1, and Operator 2 over the radio, but they do not respond. Personnel in the control room begin to realize something is wrong. Operator 6—the brother of Operator 2—grabs three 5- minute escape respirators. Other operators in the control room tell him not to enter the manufacturing building because they do not yet know what is going on or where the nonresponsive operators are. Operator 6, however, takes the escape respirators and heads into the manufacturing building. 3:40 am Operator 6 encounters Operator 4 in the stairway and puts an escape respirator on him. The breathing air helps Operator 4 recover, and he exits the manufacturing building safely. 3:40 am Operator 5 attempts to communicate by radio to inform co-workers of his exposure to a chemical release in the manufacturing building. (It is unclear if others hear him.) 3:40 am The manufacturing building fume release alarm sounds. It is a manually activated alarm intended to alert area workers of a toxic chemical release in the building. Operator 6 likely activated it. 3:50 am The Board Operator calls for the plant emergency response team (ERT) to respond, communicating that workers are missing. ERT members believe they are called to perform a rescue (e.g., broken bone) and do not know there is a toxic chemical release. 3:57 am The Board Operator calls the security guard at the main entrance and asks the guard to call 9-1-1. There is still confusion about what is going on, and the Board Operator communicates that workers are missing and requests rescue. The guard gives limited information to the 9-1-1 operator. 3:58 am Site emergency responders from the ERT arrive at the scene, but they do not have proper personal protective equipment (PPE) to enter a building with an active hazardous chemical release (methyl mercaptan is both highly toxic and highly flammable). They have prepared and responded to perform a technical rescue and brought gear only for that operation (harnesses, ropes, and haul systems). When they arrive at the manufacturing building, they realize it is a chemical release and they need additional PPE. 4:05 am The site Incident Commander who responded to the initial rescue request calls for the ERT to come to the scene with bunker gear and self-contained breathing apparatus (SCBA)—necessary PPE to enter an area with a toxic chemical release.

  Page  148  

La  Porte,  Texas  |  Incident  Date:  November  15,  2014  |  No.  2015-­01-­I-­TX   U.S.  Chemical  Safety  and   Hazard  Investigation  Board   Toxic  Chemical  Release  at  the   DuPont  La  Porte  Chemical  Facility   4:10 am The truck containing the ERT’s SCBAs and radios does not start and cannot come to the scene. An October 2, 2014 work order stated, “Check batteries and they were not good, remove and replace with new ones.” Replacing the battery did not fully repair the truck, and it still could not start at the time of the incident. After the incident, DuPont replaced the truck’s alternator, battery cable, and belts. DuPont did not adequately maintain the SCBA truck before the incident to ensure it could operate during an emergency. 4:12 am A second 9-1-1 call is made by one of the area supervisors. 4:18 am Harris County Sherriff’s deputies arrive at control room. 4:20 am Operator 3 regains consciousness and manages to exit the manufacturing building of his own volition. Fire brigade members escort him to safety. 4:25–4:45 am First ERT team enters manufacturing building. While they are in the manufacturing building they do not monitor the concentration of methyl mercaptan, which in addition to being toxic, is a highly flammable chemical. CSB calculations indicate that at times a portion of the building had an explosive atmosphere from the release. A 2002 DuPont study found that a methyl mercaptan vapor cloud explosion could cause the manufacturing building to collapse, but the ERT did not know that. An ERT member finds drain valves from the waste gas vent header on the third floor open with a gas (later determined to be methyl mercaptan) flowing from them. The Shift Supervisor is found unconscious on the third floor approximately 30 feet north of the drain valves. Operator 6 is found next to his brother (Operator 2), both unconscious. Operator 2 has a 5-minute escape respirator on his head. The respirator is one of the three escape packs brought into the building by his brother (Operator 6). Operator 6 has a 30-minute SCBA air bottle in front of him and the mask on his face, but he has not connected the mask to the air bottle. (Operator 6 was likely incapacitated by methyl mercaptan while trying to don the SCBA, before he connected his mask to the SCBA air bottle.) It is later determined that the Shift Supervisor, Operator 2, and Operator 6 died from toxic exposure / asphyxiation. 5:08 am First group of external fire fighters arrive on-site. 5:09 am Second group of external fire fighters arrive on-site. 5:10 am Third group of external fire fighters arrive on-site. 5:15 am Second ERT entry conducted. DuPont and other plant ERT emergency responders do not monitor the methyl mercaptan concentration inside of the manufacturing building. On the third floor, an ERT responder closes an open drain valve from which a gas (methyl mercaptan) is escaping. 6:02 am Methyl mercaptan storage tank pump is turned off, significantly slowing the methyl mercaptan release to the atmosphere. 6:10 am–9:30 am Third, fourth, and fifth ERT entries are conducted to look for missing Operator 1. DuPont and other plant ERT emergency responders do not monitor the methyl mercaptan concentration inside of the manufacturing building. (When Harris County emergency responders conduct building entries, beginning after about 6:40 am, they

  Page  149    

La  Porte,  Texas  |  Incident  Date:  November  15,  2014  |  No.  2015-­01-­I-­TX   U.S.  Chemical  Safety  and   Hazard  Investigation  Board   Toxic  Chemical  Release  at  the   DuPont  La  Porte  Chemical  Facility   monitor the air inside the manufacturing building using a QRAE monitor and a MultiRAE monitor.) Emergency responders cannot find Operator 1, possibly because there could be areas inside the manufacturing building that they are not aware they have not searched. They have no maps to reference during their search, and the manufacturing building is not equipped with cameras to view the different floors of the building. Area operators—including the Board Operator—draw building maps to assist emergency responders in navigating the manufacturing building. ERT responders continue closing valves to stop the release of methyl mercaptan. 6:14 am Sheriff’s sergeant notices an “intense smell” in Deer Park (west of La Porte). 6:38 am A sheriff’s sergeant driving on Texas Highway 225 communicates that “the odor on 225 is strong.” 8:07 am Harris County performs first off-site air monitoring (near Highway 225) and does not detect methyl mercaptan in the air. 10:07 am DuPont activates the methyl mercaptan tank emergency isolation valve to stop methyl mercaptan from flowing to the process. 11:15 am–11:55 am Sixth ERT entry is conducted. Operator 1 is recovered in the north stairwell of the manufacturing building. She is later determined to be deceased, having died from toxic exposure / asphyxiation. 11:40 am Final waste gas vent header drain valve is closed to fully stop methyl mercaptan release.

  Page  150  

La  Porte,  Texas  |  Incident  Date:  November  15,  2014  |  No.  2015-­01-­I-­TX   U.S.  Chemical  Safety  and   Hazard  Investigation  Board   Toxic  Chemical  Release  at  the   DuPont  La  Porte  Chemical  Facility   APPENDIX  C:  ODOR  COMPLAINTS  FROM  NOVEMBER  15,  2014  

Figure  40.    Map  of  the  Odor  Complaints  (Yellow  Pins)  from  the  November  15,  2014  Incident.    Source:  Harris  County,  Texas.  

  Page  151    

La  Porte,  Texas  |  Incident  Date:  November  15,  2014  |  No.  2015-­01-­I-­TX   U.S.  Chemical  Safety  and   Hazard  Investigation  Board   Toxic  Chemical  Release  at  the   DuPont  La  Porte  Chemical  Facility   APPENDIX  D:  EMERGENCY  RESPONSE  TABLES   The regulatory tables in this appendix focus on the most significant OSHA and EPA requirements regarding Emergency Response and Preparedness. Companies should first determine what regulations apply to their process or facility and whether they are statutorily required to conduct or will voluntarily conduct an emergency response.a Based on this information, companies should develop an integrated approach to their requirements. Table  1.    OSHA  and  EPA  Regulations  That  Apply  to  Emergency  Response  Preparedness.   Regulation Name Requirement 29 C.F.R. § 1910.119 Process Safety Management of Highly Hazardous Chemicals (PSM) Requires an emergency action plan or an emergency response plan (if there is an internal emergency response team). 29 C.F.R. § 1910.38 Emergency Action Plans Dictates the minimum procedures necessary to alert emergency personnel of an emergency. 29 C.F.R. § 1910.120 Hazardous Waste Operations and Emergency Response (HAZWOPER) Requires an emergency response plan if there are hazardous materials and there is an internal emergency response. 42 U.S.C. § 116 Emergency Planning and Community Right-to-Know Act (EPCRA) Requires states to develop a state emergency planning commission and local emergency planning committees (LEPC). Requires an emergency response plan and emergency notifications. 40 C.F.R. § 68(G) Risk Management Plan (RMP)b Requires an emergency response program. Requirements may potentially be fulfilled by developing emergency response plans required by other agencies.

a The term response has the same meaning under OSHA’s Hazardous Waste Operations and Emergency Response (HAZWOPER) standard and EPA’s Risk Management Plan rule [151, p. 2]. OSHA defines emergency response under the HAZWOPER standard as “a response effort by employees from outside the immediate release area or by other designated responders (i.e., mutual aid groups, local fire departments, etc.) to an occurrence which results, or is likely to result, in an uncontrolled release of a hazardous substance. Responses to incidental releases of hazardous substances where the substance can be absorbed, neutralized, or otherwise controlled at the time of release by employees in the immediate release area, or by maintenance personnel are not considered to be emergency responses within the scope of this standard. Responses to releases of hazardous substances where there is no potential safety or health hazard (i.e., fire, explosion, or chemical exposure) are not considered to be emergency responses” (29 C.F.R. § 1910.120(a)(3)). b The EPA has published general guidance on Emergency Response Programs and other aspects of RMP.

  Page  152  

La  Porte,  Texas  |  Incident  Date:  November  15,  2014  |  No.  2015-­01-­I-­TX   U.S.  Chemical  Safety  and   Hazard  Investigation  Board   Toxic  Chemical  Release  at  the   DuPont  La  Porte  Chemical  Facility     Table  2.    Requirements  for  an  Emergency  Action  Plan  (29  C.F.R.  §  1910.38)  and  Emergency  Response  Plan  (29  C.F.R.  §  1910.120)  under   OSHA.   Requirement Emergency Action Plan Emergency Response Plan Procedures for reporting a fire or other emergency ✓

Procedures for emergency evacuation, including type of evacuation and exit route assignments ✓

Procedures for employees who remain to operate critical plant operations before they evacuate ✓

Procedures to account for all employees after evacuation ✓

Procedures for employees performing rescue or medical duties ✓

The name or job title of every employee who may be contacted by employees who need more information about the plan or an explanation of their duties under the plan ✓

Pre-emergency planning and coordination with outside parties

✓ Personnel roles, lines of authority, training, and communication

✓ Emergency recognition and prevention

✓ Safe distances and places of refuge

✓ Site security and control

✓ Evacuation routes and procedures

✓ Decontamination

✓ Emergency medical treatment and first aid

✓ Emergency alerting and response procedures

✓ Critique of response and follow-up

✓ Personal protective equipment and emergency equipment

✓  

 

  Page  153    

La  Porte,  Texas  |  Incident  Date:  November  15,  2014  |  No.  2015-­01-­I-­TX   U.S.  Chemical  Safety  and   Hazard  Investigation  Board   Toxic  Chemical  Release  at  the   DuPont  La  Porte  Chemical  Facility   Table  3.    Emergency  Response  Program  requirements  under  RMP  for  Responding  Facilities.   Elements Requirement Emergency response plan An emergency response plan maintained at the facility that includes (1) procedures for informing the public and emergency response agencies about releases, (2) documentation of proper first aid and emergency medical treatment necessary to treat human exposures, and (3) procedures and measures for emergency response Planning coordination Coordination with local response agencies on responses to potential release of regulated substances Emergency equipment Procedures for using, inspecting, testing, and maintaining emergency response equipment Employee training Training for all employees in relevant procedures Response plan evaluation Procedures for reviewing and updating the response plan to reflect changes at the facility and for ensuring that employees are informed of the changes  

 

  Page  154  

La  Porte,  Texas  |  Incident  Date:  November  15,  2014  |  No.  2015-­01-­I-­TX   U.S.  Chemical  Safety  and   Hazard  Investigation  Board   Toxic  Chemical  Release  at  the   DuPont  La  Porte  Chemical  Facility   Table  4.    Industry  and  Government  Guidance  Related  to  Emergency  Response.   Organization Name Description Federal Emergency Management Agency (FEMA) National Incident Management System (NIMS) A common framework for overall incident management. A comprehensive approach that is applicable at all jurisdictional levels American Petroleum Institute (API) RP API 1174, API Recommended Practice for Pipeline Emergency Preparedness and Response Enhanced framework for an emergency management system for onshore hazardous liquid pipeline operators National Fire Protection Association (NFPA) NFPA 472, Standard for Competence of Responders to Hazardous Materials/Weapons of Mass Destruction Incidents Minimum levels of competence required by responders to emergencies involving hazardous materials or weapons of mass destruction National Fire Protection Association (NFPA) NFPA 475, Recommended Practice for Organizing, Managing, and Sustaining a Hazardous Materials/Weapons of Mass Destruction Response Program Criteria for the organization, management, and deployment of personnel, resources, and programs for entities responsible for the hazardous materials/weapons of mass destruction emergency preparedness function National Fire Protection Association (NFPA) NFPA 600, Standard on Facility Fire Brigades Requirements for organizing, operating, training, and equipping industrial fire brigades National Fire Protection Association (NFPA) NFPA 704, Standard System for the Identification of the Hazards of Materials for Emergency Response The NFPA’s Hazard Diamond, a labeling system that identifies the hazards of materials National Fire Protection Association (NFPA) NFPA 1221, Standard for the Installation, Maintenance, and Use of Emergency Services Communications Systems The installation, performance, operation, and maintenance of communications systems and facilities used by public emergency services National Fire Protection Association (NFPA) NFPA 1250, Recommended Practice in Fire and Emergency Service Organization Risk Management Criteria to develop, implement, or evaluate a fire and emergency service organization risk management program for effective risk identification, control, and financing National Fire Protection Association (NFPA) NFPA 1561, Standard on Emergency Services Incident Management System and Command Safety Requirements for the structure and operation of an incident management system for emergency services, including principles of command safety to be incorporated into all incidents, training, or emergencies, to ensure the safety of emergency responders and others on the scene of an incident National Fire Protection Association (NFPA) NFPA 1600, Standard on Continuity, Emergency, and Crisis Management Common set of criteria for all hazards, disaster, emergency management, and business continuity or continuity-of-operations programs

  Page  155    

La  Porte,  Texas  |  Incident  Date:  November  15,  2014  |  No.  2015-­01-­I-­TX   U.S.  Chemical  Safety  and   Hazard  Investigation  Board   Toxic  Chemical  Release  at  the   DuPont  La  Porte  Chemical  Facility   Organization Name Description National Fire Protection Association (NFPA) NFPA 1620, Standard for Pre- Incident Planning Criteria for developing pre-incident plans to help responders effectively manage emergencies

  Page  156  

La  Porte,  Texas  |  Incident  Date:  November  15,  2014  |  No.  2015-­01-­I-­TX   U.S.  Chemical  Safety  and   Hazard  Investigation  Board   Toxic  Chemical  Release  at  the   DuPont  La  Porte  Chemical  Facility   APPENDIX  E:  DUPONT  SAFETY  PERCEPTION  SURVEYS   For more than a decade, DuPont developed and honed a safety culture program to reduce its OSHA total recordable injury rate by assessing and improving occupational (personal) safety, using its Bradley Curve and Safety Perception Survey tools. In the 1990s, DuPont identified a significant discrepancy in safety performance at different DuPont sites around the world. Some of the company’s sites had few recordable injuries, and other sites had many. To improve safety performance at DuPont sites, a former DuPont Chairman and CEO created a team dubbed the Discovery Team to find a sustainable way to strengthen safety performance at all DuPont facilities, with the ultimate goal of having zero incidents throughout the entire organization [77]. The Discovery Team found that the sites with the best worker safety records more prevalently practiced DuPont safety principles. The Discovery Team also asserted that sites with the most worker injuries had a lack of management commitment to safety, more communication breakdowns, and inconsistent safety leadership. Overall, the Discovery Team claimed that DuPont sites with fewer worker injuries had a distinctive safety culture that permeated the entire facility [77]. Verlon Bradley, then manager of the DuPont plant in Beaumont, Texas, along with the Discovery Team, created a model named the Bradley Curve (Figure 41). The Bradley Curve aimed to illustrate the strength of an organization’s safety culture and its relationship to the number of worker (OSHA recordable) injuries [77]. DuPont began using the Bradley Curve model internally, and in 1995, DuPont’s consulting service, DuPont Sustainable Solutions, began applying the Bradley Curve model to improve safety performance at other companies in various industries [78].

  Page  157    

La  Porte,  Texas  |  Incident  Date:  November  15,  2014  |  No.  2015-­01-­I-­TX   U.S.  Chemical  Safety  and   Hazard  Investigation  Board   Toxic  Chemical  Release  at  the   DuPont  La  Porte  Chemical  Facility  

Figure  41.    The  DuPont  Bradley  Curve.    The  Bradley  Curve  correlates  improved  safety  culture  with  reduced  OSHA   recordable  injury  rates.    For  more  information,  see  Bradley  Curve.  Source:  DuPont.  

In 1999, DuPont formalized a method to assess an organization’s safety culture with its Safety Perception Surveya to measure the strength of the safety culture at each site. The Safety Perception Survey consists of 24 multiple-choice questions to measure safety culture across three categories of safety management: (1) leadership, (2) processes and actions, and (3) structure [59, p. 2]. The survey addresses only 12 of DuPont’s 22 essential elements of an integrated safety management system (Figure 42). It focuses on elements it labels “cultural” and places under “Management Commitment” and does not address components related to what it calls “risk-based” process safety, such as management of change. According to DuPont Sustainable Solutions, the Bradley Curve benchmarking system, combined with DuPont’s Safety Perception Surveys, has helped DuPont and its clients improve their safety culture performance [78].

a A safety management consultant and former DuPont executive developed the Safety Perception Survey, which was first published in

  1. DuPont acquired the survey in 2000. DuPont modified it and incorporated it into its consulting methodology for benchmarking

and action planning [59, p. 2].

  Page  158  

La  Porte,  Texas  |  Incident  Date:  November  15,  2014  |  No.  2015-­01-­I-­TX   U.S.  Chemical  Safety  and   Hazard  Investigation  Board   Toxic  Chemical  Release  at  the   DuPont  La  Porte  Chemical  Facility  

Figure  42.    To  DuPont,  Each  Wheel  Represents  Different  Aspects  of  Safety.    The  wheel  on  the  left   (Cultural)  represents  the  only  aspects  of  safety  that  DuPont’s  Safety  Perception  Surveys  cover.     The  wheel  on  the  right  (Risk-­‐Based)  represents  aspects  of  safety  typically  associated  with  process   safety.    Source:  DuPont.   Beginning in 2007, DuPont began calculating a “Relative Culture Strength” (RCS) score based on responses to the Safety Perception Surveys.a DuPont found that higher RCS correlated with a lower OSHA total recordable injury rate.b The correlation also fit the Bradley Curve (Figure 43) [59, p. 7]. Because of this correlation, DuPont often uses the OSHA total recordable injury rate “as [its] measure of safety performance” [59, p. 2]. Additionally, DuPont uses the RCS in combination with the Bradley Curve (Figure 43) to determine what stage of safety culture a facility has achieved. The curve represents the progress of a facility’s culture strength. The

a RCS is a proprietary number calculated by comparing a company’s responses to survey questions against a benchmark established by DuPont in 2008 based on the best and worst sites that had taken the Safety Perception Survey [59, p. 3]. b The OSHA recordable injury rate is the annual number of injuries and illnesses per 100 full-time workers. The OSHA injury rate, which excludes fatalities, is a normalized rate that is used for comparison across industries [171, p. 75].

  Page  159    

La  Porte,  Texas  |  Incident  Date:  November  15,  2014  |  No.  2015-­01-­I-­TX   U.S.  Chemical  Safety  and   Hazard  Investigation  Board   Toxic  Chemical  Release  at  the   DuPont  La  Porte  Chemical  Facility   higher the score, the further along the facility is on the curve, with the highest level designated “World Class.”a DuPont classified facilities with a calculated RCS value of 80 or greater as having a “World Class” safety culture. Results from a 2012 Safety Perception Survey conducted at the La Porte site, the last safety culture survey conducted at the site before the incident, classified its perception of safety performance as “World Class.” This safety classification, however, relied on the DuPont La Porte site’s employees’ perception of personal (worker) safety performance only, because the Safety Perception Survey used at DuPont La Porte did not include process safety considerations.

Figure  43.    DuPont  Bradley  Curve  with  Plotted  RCS  results  from  169,000  Safety  Perception  Surveys.    The  yellow  bars  show  the  range   of  the  middle  50  percent  of  the  data  in  each  category,  and  the  horizontal  blue  line  in  each  box  indicates  the  median.    DuPont  found   that  a  higher  RCS  correlated  with  a  lower  worker  injury  rate  (OSHA  total  recordable  injury  rate).    Source:  DuPont.  

a The Safety Perception Survey ranks performance by five categories (from best to worst): World Class, Excellence, Skill, Awareness, and Fundamentals. World Class is defined as “the organization leads its industry in safety performance as a direct result of its safety focus, leadership, deliberate organizational design, and the portfolio of activities it carries out to maintain a safe workplace.” Excellence is defined as “the organization has strong capabilities to identify, learn from, and correct at-risk behaviors and workplace hazards. Safety is a top priority. There is a free flow and exchange of information without the fear of retribution, and the organization is focused on learning and improving. Hazard reporting, auditing, and corrective implementation are well designed and executed on a regular basis.” The Skill level is defined as “the organization shows numerous signs of continuous improvement and has a track record of modest and consistent improvement in safety performance. Personnel are skilled in the application of basic safety management tools and techniques.” The Awareness level is defined as “the organization is aware of its performance and has established basic policies and processes to measure and improve safety performance. There is relatively high value for safety efforts, and an auditing system is in place to eliminate workplace hazards.” The Fundamentals level is defined as “the organization has processes in place to avoid known workplace hazards and uses trailing injury statistics for performance measurement. Injuries and incidents are the main driving force behind discussion of safety management practices. There is a written safety policy that may not be familiar to employees or be perceived as of high value. Safety performance is known to some in the organization but is not widely known or thought out.”

  Page  160  

La  Porte,  Texas  |  Incident  Date:  November  15,  2014  |  No.  2015-­01-­I-­TX   U.S.  Chemical  Safety  and   Hazard  Investigation  Board   Toxic  Chemical  Release  at  the   DuPont  La  Porte  Chemical  Facility   DuPont Sustainable Solutions responded to the new learnings about process safety culture after BP Texas City by developing 13 new process safety questions for its Safety Perception Surveys. These questions are considered optional and may be included in the survey at clients’ request.

  Page  161    

La  Porte,  Texas  |  Incident  Date:  November  15,  2014  |  No.  2015-­01-­I-­TX   U.S.  Chemical  Safety  and   Hazard  Investigation  Board   Toxic  Chemical  Release  at  the   DuPont  La  Porte  Chemical  Facility  

Members of the U.S. Chemical Safety and Hazard Investigation Board:

Kristen Kulinowski, PhD Interim Executive

Manuel Ehrlich Member

Richard Engler Member

FD06467 | 2014_美国_Macondo Blowout 与 爆炸 - Macondo Blowout and Explosion__最终报告_2.pdf

分类:06_境外及港澳台调查报告 | 年份:2014 | 地域: | 严重程度: | 场所: | 起火原因:燃气/爆炸 | 来源格式:pdf

Page 1 202-234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. U.S. CHEMICAL SAFETY BOARD

MACONDO WELL/DEEPWATER HORIZON

PUBLIC MEETING

THURSDAY, JUNE 5, 2014

U.S. CHEMICAL SAFETY BOARD MEMBERS PRESENT: RAFAEL MOURE-ERASO, Ph.D., Chairperson, U.S. Chemical Safety Board MARK GRIFFON, Member, U.S. Chemical Safety Board* STAFF PRESENT: DONALD HOLMSTROM, Director, Western Regional Office RICHARD C. LOEB, General Counsel CHERYL MacKENZIE, Investigator MARY BETH MULCAHY, Investigator *present via teleconference This transcript produced from audio provided by the U.S. Chemical Safety Board.

Page 2 202-234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. TABLE OF CONTENTS PAGE Opening Statements Rafael Moure-Eraso . . . . . . . . . . . 3 Mark A. Griffon. . . . . . . . . . . . . 9 Presentation of the CSB's Draft Report Don Holmstrom. . . . . . . . . . . . . .14 Cheryl MacKenzie . . . . . . . . . . . .15 Mary Beth Mulcahy. . . . . . . . . . . .33 Board Questions. . . . . . . . . . . . . . . .82 Public Comment . . . . . . . . . . . . . . . .93 Board Vote . . . . . . . . . . . . . . . . . 143 Closing Statement and Adjourn. . . . . . . . 145

Page 3 202-234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. 1 P-R-O-C-E-E-D-I-N-G-S 2 (time not provided) 3 CHAIRPERSON MOURE-ERASO: Good 4 afternoon, and welcome to this public meeting 5 of the U.S. Chemical Safety Board, the CSB. 6 I am Rafael Moure-Eraso, 7 Chairperson of the Board. 8 Joining me today via teleconference 9 from Australia is Board Member Mr. Mark 10 Griffon, who is over there. Also, sitting 11 with me at my left is Richard C. Loeb, CSB 12 General Counsel. I will be introducing later 13 the investigative panel. 14 The CSB is an independent, non- 15 regulatory, federal agency that investigates 16 major chemical accidents at fixed facilities. 17 The investigations examine all aspects of 18 chemical aspects, including physical causes 19 related to equipment design, as well as 20 (indiscernible due to accept) and regulations, 21 industry standards, and safety management 22 systems.

Page 4 202-234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. 1 Ultimately, we issue safety 2 recommendations which are designed to prevent 3 similar accidents in the future. The purpose 4 of today's meeting is for the CSB 5 investigative team to present to the Board the 6 first two volumes of their investigation 7 report into the Macondo oil well blowout that 8 occurred in April 20, 2010, in the Gulf of 9 Mexico. 10 As you have seen in the copies of 11 our report, the CSB has dedicated this report 12 to the 11 men that lost their lives as a 13 result of the explosion and fire. I will now 14 remember their names by mentioning them. They 15 are Jason Anderson, Aaron Dale Burkeen, Donald 16 Clark, Stephen Ray Curtis, Gordon Jones, Roy 17 Wyatt Kemp, Karl Klepinger, Jr., Keith Blair 18 Manuel, Dewey A. Revette, Shane M. Roshto, and 19 Adam Weise. 20 At this time, I would like to have 21 a moment of silence to remember these 11 22 individuals.

Page 5 202-234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. 1 (Moment of silence) 2 Thank you. 3 At this time, please allow me to go 4 over this afternoon agenda. Copies of the 5 agenda are in the front table at the entrance. 6 First, we are going to hear the 7 opening remarks of the Board. Then, we are 8 going to hear the official presentation of the 9 investigative team. And following the team's 10 presentation, the Board will be given an 11 opportunity to ask questions to the 12 investigative team. Thereafter, we will have 13 a public comment period, and then a vote on 14 approving or disapproving the draft report. 15 Before we begin, I'd like to point 16 out some safety information. Please take a 17 moment to note the location, to note the 18 locations of the exits and emergency exits of 19 this meeting room. There are the exits in the 20 back, and there are two exits on this side 21 that could be emergency exits as well as an 22 exit in this other side of the room.

Page 6 202-234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. 1 I also ask that you please mute 2 cell phones, so that these proceedings are not 3 disturbed. 4 I will follow with my opening 5 remarks. On April 20, 2010, the blowout 6 preventer, the BOP, on the Deepwater Horizon 7 drilling rig that was intended to shut off the 8 flow of high-pressure oil and gas from the 9 Macondo well in the Gulf of Mexico failed to 10 seal the well. 11 The blowout caused explosions and 12 a fire in the Deepwater Horizon rig, leading 13 to the deaths of 11 persons on board, and 14 serious injuries to 17 others. Nearly 100 15 persons escaped from the burning rig, which 16 sank two days later, leaving the Macondo well 17 spewing oil and gas into the Gulf waters for 18 a total of 87 days. By that time, the 19 resulting oil spill was the largest in 20 offshore history. 21 The CSB examined this report, this 22 event, from a process safety perspective,

Page 7 202-234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. 1 integrating fundamental safety concepts. That 2 is, the concept of the hierarchy of controls 3 and the concept of continuously driving rigs 4 as low as reasonably practicable. 5 While these approaches are not new 6 in the petrochemical world, or in other 7 offshore riggings around the globe, they are 8 not as commonplace in the U.S. outer 9 continental shelf. 10 Drilling continues to extend to new 11 depths and will operate in increasingly 12 challenging environments. The CSB report and 13 its key findings and recommendations are 14 intended to put the United States in a leading 15 role for improving well-controlled procedures 16 and practices. To maintain a leadership 17 position, the U.S. should adopt rigorous 18 management methods that go beyond current 19 industry good practices. 20 Today, the CSB investigators will 21 give an overview of the accident and describe 22 the technical factors that led to this

Page 8 202-234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. 1 blowout. Following the technical 2 presentation, they will describe the proposed 3 recommendations for ensuring greater safety in 4 the future. I thank them, I thank our 5 investigative team, for their efforts. This 6 is a small team, and this has been one of many 7 large challenging projects they have been 8 juggling. 9 If anyone in the audience wishes to 10 comment publicly after the investigator's 11 presentation, please sign up on the yellow 12 sheet in the check-in area at the entrance, 13 and I will call your name at the appropriate 14 time. 15 I will first call those who have 16 signed up, and then open the floor up to 17 anyone who wishes to speak. Please note that 18 we will have to limit public comments to three 19 minutes each. 20 I will now recognize Mr. Mark 21 Griffon, CSB Board Member, for an opening 22 statement. Mr. Griffon.

Page 9 202-234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. 1 MR. GRIFFON: Thank you, Mr. 2 Chairman. I hope my connection is okay. 3 I, first, would like to express my 4 condolences to the family and friends of those 5 who lost their lives in this tragedy. I am 6 glad to be participating here, or actually in 7 Sydney, Australia, to discuss the CSB's 8 initial report on the Macondo investigation. 9 I have been discussing this 10 incident with academics, workers, engineers, 11 and regulators around the world for several 12 years, including meetings over the last two 13 weeks in Australia. 14 Let there be no mistake, this 15 accident is not about workers making mistakes 16 or simply about equipment failing. It is 17 about organizational failures. If the lessons 18 are to be learned, they are not just lessons 19 for those involved in Macondo, but lessons for 20 the entire industry worldwide. 21 I think it is important to remember 22 why many urged the CSB to conduct this

Page 10 202-234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. 1 investigation. In June -- in a June 8th 2 letter in 2010, Congressman Waxman asked the 3 CSB to conduct this investigation because "We 4 believe the CSB's past work on BP puts it in 5 a unique position to address questions about 6 BP's safety culture and practices." 7 The letter goes on to say that as 8 part of our investigation we ask that you 9 consider the following. Due to circumstances 10 and events leading up to the Deepwater Horizon 11 explosion reflect problems in BP's corporate 12 safety culture, what role, if any, did cost- 13 cutting and budgetary concerns play in BP's 14 decisions about well design and testing? 15 How did BP Transocean and other 16 contractors apply management of changed 17 programs to assess the consequences of 18 modifications to process, technology, and 19 equipment on the Deepwater Horizon oil rig, as 20 well as organizational changes, including 21 changes to personnel, training, and budget? 22 Did BP provide adequate oversight of the

Page 11 202-234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. 1 contractors working on the well? 2 I hope these types of issues beyond 3 the blowout preventer are addressed in the 4 final two volumes of our investigation report. 5 I agree with Congressman Waxman that this is 6 the best place we can add value to the 7 learnings from this tragedy. As for the 8 reports being discussed tonight, I must first 9 say that I am disappointed with the internal 10 review process leading up to the release of 11 this report. 12 I received very interesting expert 13 review comments just days before the meeting, 14 and received a substantially revised final 15 report less than a week ago. After four years 16 of work to receive very thoughtful expert 17 comments only days before voting on our report 18 is unacceptable. This broken process, set up 19 as a norm by the Chairman and senior 20 management, has to stop. 21 As for the products being discussed 22 tonight, I am glad to see a focus on the

Page 12 202-234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. 1 effective identification and management of 2 safety critical elements, technical 3 organizational, operational, not just the 4 blowout preventer. I do, however, agree with 5 some of our expert reviewers that the report 6 should have included more extensive discussion 7 of barriers other than the blowout preventer. 8 Second, the report we are 9 discussing tonight is not meant to be CSB's 10 regulatory analysis, and yet Volume 2 includes 11 many statements comparing the approach under 12 the U.S. regulatory regime currently in place, 13 and other regimes around the world, safety 14 case type regimes. 15 I note that some expert reviewers 16 also noted a lack of evidence supporting some 17 of these statements. I look forward to a full 18 analysis of the regulatory issues, including 19 how the different regulatory approaches have 20 affected the actual operational activities on 21 offshore facilities in Volume 3 of our report. 22 Let me close by saying I hope the

Page 13 202-234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. 1 lessons of the Deepwater Horizon tragedy will 2 be transformative for offshore safety 3 worldwide. Industry must do everything they 4 can to prevent such a tragedy in the future. 5 Thank you. 6 CHAIRPERSON MOURE-ERASO: Thank you 7 very much for your statement, Board Member 8 Griffon. 9 At this time, we would like to 10 introduce the investigation team. I will 11 start by introducing the Western Office 12 Regional Director of the CSB, Mr. Donald 13 Holmstrom. Mr. Donald Holmstrom is the 14 Director of the WRO office in Denver, 15 Colorado. Mr. Holmstrom joined the CSB in 16 1999 and led and supervised a number of CSB 17 investigations, including the 2005 BP Texas 18 City refinery explosion and fire. 19 Prior to coming to the CSB, he 20 worked for 18 years in the oil refining 21 industry. He has extensive experience in 22 other refinery operations, process safety

Page 14 202-234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. 1 management, occupational health and safety, 2 and incident investigation. I will ask Mr. 3 Holmstrom to introduce the members of the 4 investigative team and to proceed from here. 5 Mr. Holmstrom. 6 MR. HOLMSTROM: Thank you, Chairman 7 Moure-Eraso. Today I would like to introduce 8 here at the table the investigative team. 9 First of all, I would like to introduce Cheryl 10 MacKenzie. She is the team lead of the 11 Macondo investigation. Cheryl joined the CSB 12 in 2004, and she has been involved in numerous 13 CSB investigations and safety studies, 14 including the 2005 BP Texas City refinery 15 explosion. 16 Also up here at the podium is Mary 17 Beth Mulcahy. Mary Beth has a Ph.D. in 18 physical chemistry from the University of 19 Colorado in Boulder, and she has overseen many 20 of the technical aspects of our Macondo 21 investigation. 22 Also joining us is Stan Chrisman,

Page 15 202-234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. 1 a CSB consultant. Stan has 38 years of 2 experience in petroleum drilling and 3 production. 4 With that, I would ask Cheryl 5 MacKenzie to start the presentation. 6 MS. MacKENZIE: Thank you, Mr. 7 Holmstrom. Thank you, Chairman Moure-Eraso 8 and Board Member Griffon. Good afternoon to 9 all of you. Thank you for coming here to hear 10 our findings and conclusions. 11 It has been four years since the 12 Macondo incident occurred, and there have been 13 many published reports that have described and 14 analyzed the events of April 20, 2010. So the 15 obvious question is: why another Macondo 16 report? Haven't all the lessons been learned? 17 The CSB has concluded no. 18 The CSB has carefully chosen issues 19 to address in the volumes of its reports that 20 have not been addressed by others or need 21 further development. This is certainly the 22 case here with the volumes we are presenting

Page 16 202-234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. 1 today. The blowout preventer was examined in 2 three phases identified here in this visual as 3 preliminary, Phase 1, and Phase 2. 4 Most of the major reports, except 5 Transocean, were either published before the 6 final phase was completed or did not have 7 access or address the full set of data. 8 Details that emerge in the third 9 phase of testing -- excuse me, in the second 10 phase of testing -- are imperative, as they 11 reveal latent failures that existed in the 12 Deepwater Horizon BOP before it was ever 13 deployed to the well head. 14 The CSB also conducted additional 15 testing, which further bolstered our findings 16 and analysis. All of this will be discussed 17 in more detail momentarily. 18 Ultimately, what our investigative 19 analysis shows is that the numerous technical 20 shortcomings in the hardware of the BOP were 21 manifestations of management system failures 22 that resulted in inadequate treatment of the

Page 17 202-234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. 1 blowout preventer as a safety critical device. 2 It is important to note, as this 3 visual depicts, the success of technical 4 elements, the equipment and engineered 5 controls, depends highly upon organizational 6 and operational practices. These human and 7 organizational factors will be briefly 8 mentioned throughout our discussion today, but 9 will be addressed more thoroughly in 10 subsequent volumes of the CSB Macondo 11 investigation report. 12 So today we are going to give you 13 a quick incident overview and play the CSB's 14 newly developed animation, which details the 15 immediate events leading up to the fire and 16 explosion on the Deepwater Horizon. 17 This will introduce you to some of 18 the offshore terminology and will provide you 19 with an initial look at the key aspects of our 20 significant technical findings. We will then 21 go over specifics regarding our BOP technical 22 failure analysis, and we will go beyond the

Page 18 202-234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. 1 events of April 20th and discuss the latent 2 safety management system deficiencies related 3 to the safety critical device. 4 We will wrap up with a discussion 5 of the role of regulations as they pertain to 6 the management of safety critical elements, 7 and then at that time we will present our 8 proposed recommendations for safety change to 9 the Board. 10 On April 20, 2010, the Deepwater 11 Horizon drilling rig, owned by TransOcean and 12 under contract by BP, experienced explosions 13 and fire at the Macondo well in the Gulf of 14 Mexico, resulting in 11 deaths, 17 critical 15 injuries, and the release of approximately 16 three to five million barrels of oil into the 17 Gulf. 18 At this time, I'd like to show you 19 our animation. 20 (Animation begins) 21 MALE VOICE: This is a model to 22 demonstrate the effect of pressure on pipe.

Page 19 202-234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. 1 What we have is an ordinary piece of garden 2 sprinkler pipe, and we have it connected to an 3 air pump. When we put pressure on the pipe, 4 let's see what happens. 5 MS. MacKENZIE: Something else we 6 wanted to show you. That's -- it's on a CD. 7 It's on a CD. It wasn't a file that we gave 8 earlier. 9 All right. Well, we'll skip the 10 animation. Maybe if they find it, we can come 11 back to it. Yes, okay. Thank you. 12 (Pause) 13 Technology. 14 (Pause) 15 I can continue while -- go ahead? 16 I'll need the slides back, though. 17 MALE VOICE: April 20th, 2010, 11 18 workers died and 17 were seriously injured by 19 an explosion on the Deepwater Horizon, an 20 offshore drilling rig located approximately 50 21 miles off the coast of Louisiana. The rig 22 burned for two days, eventually sinking and

Page 20 202-234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. 1 triggering the largest oil spill in U.S. 2 history, as oil and gas spewed up from the sea 3 floor. 4 The Deepwater Horizon had been 5 drilling an oil well in 5,000 feet of water in 6 an area of the Gulf of Mexico known as the 7 Macondo Prospect. 8 In 2010, the CSB launched an 9 investigation to examine the technical, 10 organizational, and regulatory factors that 11 contributed to the accident. During the 12 investigation, the CSB made new findings about 13 why a key piece of safety equipment, the 14 Deepwater Horizon's blowout preventer, failed 15 to seal the well during the emergency. 16 These new findings help explain why 17 the accident was so devastating, and the CSB 18 cautioned that other blowout preventers 19 currently in use could fail in similar ways. 20 Drilling an offshore well involves 21 creating a pathway between the drilling rig 22 and oil and gas reservoirs trapped beneath the

Page 21 202-234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. 1 sea floor. A deep whole or a well bore is 2 drilled through layers of sub-sea rock and 3 sediment. These rocky layers can contain 4 trapped water, crude oil, and natural gas 5 under pressure. 6 An unplanned flow of these well 7 fluids into the well bore, known in the 8 industry as a kick, can be dangerous. Without 9 careful management, a kick can lead to a 10 blowout, the uncontrolled release of flammable 11 oil and gas from the well. A blowout can be 12 catastrophic, since oil and gas reaching the 13 drilling rig can quickly find an ignition 14 switch, leading to a fire or explosion, 15 endangering the lives of the drilling crew. 16 To prevent kicks, drillers pump a 17 dense slurry called drilling mud into the well 18 creating a barrier between the undersea oil 19 and gas and the piping that leads to the rig. 20 If this mud barrier fails, or is somehow 21 removed, the safety of the drilling crew 22 depends on a critical piece of equipment

Page 22 202-234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. 1 located on the sea floor called the blowout 2 prevent, or BOP. 3 The BOP is a complex electrically 4 and hydraulically powered device that is 5 essential for controlling the well, and, in an 6 emergency situation, preventing a disaster on 7 the platform high above on the sea surface. 8 The BOP is connected to the rig by a large 9 diameter pipe called a riser. If a kick 10 occurs, the blowout preventer is designed to 11 prevent flammable oil and gas from traveling 12 up the riser to the drilling rig. This is 13 done by sealing the area around the drill pipe 14 known as the annular space. 15 To do this, the crew can manually 16 close pipe rams and donut-shaped rubber 17 devices known as annular preventers. If those 18 devices should fail to work, the last resort 19 is a pair of sharp metal blades, which form a 20 blind shear ram designed to cut the drill pipe 21 and seal the well. The blind shear ram can be 22 activated manually or by automated emergency

Page 23 202-234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. 1 systems. 2 At approximately 8:45 p.m. on 3 April 20th, 2010, a kick occurred in the 4 Macondo well. Oil and gas entered the well 5 bore undetected, eventually passing above the 6 blowout preventer and traveling quickly up the 7 riser toward the Deepwater Horizon and the 126 8 people onboard. 9 Just after 9:40 p.m., drilling mud 10 forced upwards by the rising oil and gas 11 suddenly blew out onto the rig. Crew members 12 responded by closing the upper annular 13 preventer in the BOP. However, this did not 14 seal the well as intended and flammable oil 15 and gas continued to flow into the riser 16 toward the rig. 17 Next, the crew closed a pipe ram. 18 This successfully closed the annular space and 19 sealed the well, but tragically this proved to 20 be only a temporary fix. Oil and gas that 21 were already above the pipe ram continued to 22 flow inexorably toward the Deepwater Horizon.

Page 24 202-234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. 1 At approximately 9:49 p.m., the flammable 2 hydrocarbons found an ignition source. The 3 first explosions shook the Deepwater Horizon. 4 As the oil and gas escaped the 5 riser onto the rig, the pressure dropped in 6 the annular space above the pipe ram, but at 7 the same time the pressure in the drill pipe 8 climbed substantially. The drill pipe was 9 closed at the top, but oil and gas continued 10 to flow in from the reservoir below. After 11 extensive analysis, the CSB concluded that 12 this large difference in pressure likely 13 caused the drill pipe to buckle, essentially 14 bending the pipe off center inside the blowout 15 preventer. 16 The buckling pushed sections of the 17 drill pipe outside of the reach of the blind 18 shear ram blades. This would eventually prove 19 to be catastrophic. With the drill pipe 20 buckled, the explosion and subsequent loss of 21 electrical and hydraulic power from the rig 22 likely activated an automated system on the

Page 25 202-234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. 1 blowout preventer known as the AMF/Deadman, 2 which closes the blind shear ram and cuts the 3 drill pipe. This emergency system is designed 4 to activate when electric power, hydraulic 5 pressure, and communications from the rig have 6 been lost. 7 The AMF/Deadman system was operated 8 by two redundant control systems on the BOP 9 known as the yellow pod and the blow pod. The 10 redundancy is supposed to increase the 11 reliability of the system in an emergency 12 situation. The yellow and blue pods worked 13 independently of each other, and were 14 comprised of identical enclosed computer 15 systems and sets of solenoid valves. 16 When activated, the solenoid valves 17 controlled important BOP functions, such as 18 closing the blind shear ram. If electrical 19 power from the rig was lost, as happened on 20 April 20th, 2010, both the yellow and blue 21 control pods contained backup 27-volt and 22 nine-volt batteries to power emergency

Page 26 202-234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. 1 functions. The nine-volt batteries powered 2 computers that would activate the solenoid 3 valves, which were powered by the 27-volt 4 batteries. 5 However, evidence indicates the 6 blue pod had been miswired at some time before 7 the BOP was lowered onto the sea floor. This 8 caused the pod's 27-volt battery to drain and 9 made it impossible to operate the solenoid 10 valve for the blind shear ram on the night of 11 the accident. And within the redundant yellow 12 pod, the solenoid for the blind shear ram had 13 been miswired. 14 The solenoid valves were controlled 15 by two coils of electrical wire. These two 16 coils were designed to work in concert, 17 generating a magnetic field strong enough to 18 operate the valve. But within the miswired 19 solenoid valve, the two coils actually opposed 20 each other, leaving the valve paralyzed. Only 21 a third unplanned failure allowed the yellow 22 pod to operate.

Page 27 202-234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. 1 On the night of the accident, one 2 of the nine-volt batteries that powered the 3 solenoid valve's computer had failed. As a 4 result, the affected computer system could not 5 initiate the command to energize the miswired 6 coil. Had both coils of the miswired solenoid 7 valve been energized, the two coils would have 8 generated opposing forces on the valve. The 9 solenoid valve would have remained closed, and 10 the blind shear ram would never have been 11 closed. 12 However, the failed battery 13 rendered one coil inoperable, and most likely 14 allowed the other coil to open the solenoid 15 valve by itself. This, in turn, initiated 16 closure of the blind shear ram. This should 17 have cut the drill pipe and sealed the well, 18 greatly reducing the impact of the accident. 19 But because the drill pipe was buckled and off 20 center inside the blowout preventer, it was 21 trapped and only partially cut. With the 22 failure of this last-ditch measure, there was

Page 28 202-234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. 1 nothing left to stop the massive oil spill and 2 the destruction of the rig. 3 During its investigation, the CSB 4 identified a mechanism that likely caused the 5 drill pipe to be buckled around the time of 6 the explosion. This mechanism is called 7 effective compression. Although effective 8 compression had previously been noted as a 9 hazard in other drilling operations, it had 10 never been identified as a problem affecting 11 drill pipe during well operations. 12 Effective compression occurs 13 because although pipe may appear to be 14 perfectly straight, in fact it has minute 15 bends and irregularities invisible to the 16 naked eye. Along these bends, the side of the 17 pipe that is curved outward is slightly longer 18 and has more surface area than the other side. 19 When there is a large difference in 20 pressure between the inside and outside of the 21 pipe, as happened on April 20th, 2010, the 22 longer side of the pipe experiences a larger

Page 29 202-234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. 1 bending force. Eventually, this force can 2 become great enough to buckle even heavy pipe. 3 This is an important finding, CSB 4 investigators said, because the same 5 conditions of differential pressure could 6 occur at other drilling rigs, even if a crew 7 successfully shuts in a well. 8 The CSB warned this could make 9 existing blowout preventer designs less 10 effective in emergency situations. 11 In the case of the Deepwater 12 Horizon accident, the buckled drill pipe 13 prevented the blind shear ram from sealing the 14 well. Oil and gas from the well flowed out of 15 the buckled drill pipe and into the Gulf of 16 Mexico for 87 days. A reported five million 17 barrels of oil eventually spilled, causing one 18 of the worst environmental disasters in United 19 States history. 20 (Video ends) 21 MS. MacKENZIE: These technical 22 findings reveal several new learnings critical

Page 30 202-234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. 1 for safe drilling operations offshore and 2 applicable for everyone in the industry. 3 First -- the slides back. First, 4 as the animation depicts, we conclude that the 5 automatic emergency response system within the 6 blowout preventer, the AMF/Deadman, actuated 7 on the night of April 20th, activating a sharp 8 pair of blades called the blind shear ram to 9 seal the well. 10 Other reports have concluded the 11 AMF did not fire and that the blind shear ram 12 was activated two days later. Our technical 13 findings also have led us to conclude that the 14 buckling of the drill pipe was actually the 15 result of a mechanism not revealed by other 16 reports on the incident, a phenomenon known as 17 effective compression. This will be discussed 18 in more detail shortly. 19 What these technical findings and 20 conclusions mean for industry is that the 21 buckling of the drill pipe can actually occur 22 when a well is successfully shut in by the

Page 31 202-234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. 1 drill crew and can remain undetected. This 2 hazard could impact even the best offshore 3 companies who are properly maintaining their 4 BOPs. 5 Our investigative analysis of the 6 technical failures also illustrate that 7 industry and regulatory practice for testing 8 of the rarely used AMF/Deadman emergency 9 system can give companies a false positive 10 result. The procedure for testing the AMF 11 actually masks potential failures in the 12 redundant components of the emergency system. 13 Thus, some of these components 14 meant to safely -- some of these components 15 meant to be safety redundancies to ensure 16 reliable functioning of the AMF may actually 17 fail during the test but remain undetected 18 until it is too late. This means that similar 19 deficiencies identified in the Deepwater 20 Horizon BOP could remain undetected in BOPs 21 today. 22 Overall, the numerous shortcomings

Page 32 202-234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. 1 in the hardware of the BOP were manifestations 2 of the lack of an effective management system 3 to ensure the functioning of this and other 4 safety critical barriers. The CSB found a 5 documented inability to reliably shear the 6 drill pipe was used for an extended period 7 during the drilling process. 8 Knowing this risk, Transocean 9 planned a two-step workaround that actually 10 would have high likelihood of failure in the 11 event that the two emergency systems, the 12 AMF/Deadman and auto shear, were activated. 13 CSB also found inadequate safety management 14 practices resulting in undocumented and 15 inadequate BOP maintenance and inspection. 16 Ultimately, although industry 17 guidance and offshore safety regulations have 18 advanced safety after Macondo, more change is 19 needed to ensure that all safety critical 20 elements -- technical, operational, and 21 organizational -- are effectively managed 22 through the life cycle of their use.

Page 33 202-234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. 1 I will now turn the presentation 2 over to Dr. Mulcahy, who will discuss the 3 technical failures in more detail. 4 DR. MULCAHY: Thank you. So 5 although I assume many people in this room are 6 familiar with the Macondo incident, I'm going 7 to step back and just give a couple of other 8 additional details that weren't covered in the 9 video. And then I'm going to step through the 10 technical findings, providing more detail than 11 was originally given in the video. 12 So the video mentioned two 13 different physical barriers, drilling mud that 14 was placed into the well, and also a blowout 15 preventer that was located at the well head. 16 There are also two other -- or three other 17 potential barriers that are in a well or used 18 in a well. The first is casing and the cement 19 that secures the casing to protect the walls 20 of the well bore, that help seal hydrocarbon- 21 bearing zones as the well bore is being 22 drilled.

Page 34 202-234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. 1 Another one is drilling crews can 2 install bottom hole cement at the bottom of a 3 well, again, to seal hydrocarbon-bearing zones 4 so that there is not an ingress into the well. 5 And, finally, there is an option of installing 6 a surface cement plug -- again, another 7 physical barrier that can seal a well. 8 At Macondo, at the time of the 9 incident, the crews were in the process of 10 temporarily abandoning the well, which means 11 they were removing various equipment and 12 drilling mud with the intent of leaving the 13 well ready for a production facility to come 14 back later and process the hydrocarbons that 15 were found in the well. 16 As it turned out, the cement 17 barrier that had been placed at the bottom of 18 the well had been tested, but the test results 19 had been misinterpreted, and this erroneously 20 led the drilling crew to believe that they had 21 sealed the well when in fact they had not. 22 And this is -- believing this, they began the

Page 35 202-234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. 1 process of displacing the drilling mud from 2 the well. 3 At the time of the incident, the 4 drilling mud was being removed. By removing 5 the drilling mud, the drilling crew was 6 removing one of the physical barriers that 7 could have prevented the ingress of 8 hydrocarbons into the well. The service 9 cement plug that had been planned as part of 10 the temporary abandonment process had not yet 11 been installed. As I mentioned previously, 12 the cement at the bottom of the well had 13 actually not been -- the integrity had not 14 been ensured, and the BOP at the well head was 15 in its open position. 16 So the timeline of events that day, 17 the CSB calculations and modeling, we predict 18 that at about 8:51 p.m. that evening the well 19 became underbalanced, meaning that 20 hydrocarbons from the well began to flow into 21 the well bore. A kick had begun. Over the 22 next 35 minutes, more hydrocarbons entered the

Page 36 202-234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. 1 well until they finally surpassed or passed 2 above the BOP. 3 Once the hydrocarbons got -- pass 4 above the BOP, they have only one place to go 5 and that's the rig. There is no physical 6 means to stop them from making their way to 7 the rig. The best hope the crew can have is 8 to divert them to a safe location. 9 It wasn't, though, until 9:40 when 10 mud passed -- or exited onto the rig floor 11 that the crew was aware of the problem of the 12 kick that had occurred in the well. At 13 approximately 9:43, they closed the upper 14 annular, but that failed to seal the well. 15 That was followed shortly after at about 9:47 16 with the closing of the pipe ram, which we do 17 believe sealed the well. But this turned out 18 to only be temporary because at approximately 19 9:49 the explosions on the rig occurred. 20 After the efforts had been 21 completed to stop flow from the well, the BOP, 22 the Deepwater Horizon BOP, was recovered and

Page 37 202-234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. 1 brought to a testing facility, and DNV was 2 contracted to do a forensic analysis of the 3 BOP. There was a lot of interest in people to 4 understanding why the BOP had not sealed the 5 well, particularly since it did have an 6 AMF/Deadman system. 7 The physical evidence showed one 8 very important aspect that has been well 9 documented and publicized. The BOP, if you 10 look at the image on the left, was designed to 11 seal a drill pipe that had been centered in 12 the well, but the physical evidence indicated 13 that it had not in fact been centered but was 14 off centered, and that is depicted in the 15 image on the right. 16 So that when the blind shear ram is 17 closed, a portion of the drill pipe was 18 outside of the shearing part of the rams, and 19 so it was actually squeezed and not completely 20 severed. And this eventually caused the blind 21 shear ram not to be able to close fully. 22 This physical evidence requires us

Page 38 202-234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. 1 to consider two very important conditions that 2 we have to match in time. The first is we 3 have to identify what caused or what activated 4 the blind shear rams to close. And, very 5 importantly, we have to correlate that in time 6 with the buckling mechanism that caused the 7 drill pipe to become off center in the well. 8 We see that there are two most 9 likely situations. The first one is -- that 10 I have represented up here on the left -- is 11 the triggering of the AMF/Deadman system, 12 which is a fully automated system that can 13 trigger the well -- or trigger the closure of 14 the blind shear rams. And the second one is 15 the auto shear system. That normally is not 16 triggered unless a rig drifts offsite, but in 17 this case -- this is an image taken from an 18 ROV or remotely-operated vehicle, where they 19 were able to use a robotic arm to trigger the 20 auto shear mechanism. 21 So the Deadman system, there are 22 three conditions that must be met in order for

Page 39 202-234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. 1 it to activate. The first is surface 2 electrical power and communications coming 3 from the rig have to be severed. Second, 4 there has to be a loss of communication 5 between the yellow and blue pods. And, third, 6 there has to be a loss of hydraulic pressure 7 coming from the rig. 8 We believe that the conditions that 9 were present by the initial explosions on the 10 rig likely established those conditions. 11 When we look at the auto shear, we 12 know from video evidence on April 22nd, 2010, 13 that the auto shear did likely trigger. 14 That's what it appears to look like when you 15 see the video. 16 But the triggering of the auto 17 shear on April 22nd does not preclude the 18 triggering of the blind shear rams originally 19 with the AMF/Deadman system. For reasons that 20 I will discuss shortly, we considered the most 21 likely scenario of the buckling led us to 22 examine more carefully the possibility of the

Page 40 202-234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. 1 AMF/Deadman being the cause of the closing of 2 the blind shear ram. 3 So what I'm about to present is 4 highly dependent on data that was collected 5 during this Phase 2 testing of the Deepwater 6 Horizon BOP. The other major reports, BP's 7 report, the Chief Counsel report from the 8 Presidential Oil Spill Commission, DNV's 9 report, all of those reports were published 10 before this Phase 2 testing was completed. 11 And there was critical information, and people 12 have heard now about miswiring of a critical 13 solenoid. It was mentioned in the video. 14 That wasn't discovered until the Phase 2 15 testing was complete. 16 When you look at the JAT reports 17 and NAE reports, they also do not address the 18 battery issues and miswiring that were 19 identified during Phase 2 testing. 20 So I hope -- for everybody sitting 21 in the audience, we have two very detailed 22 technical analyses/appendices that we are

Page 41 202-234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. 1 publishing with our report, and we have 2 summarized the findings more generally in our 3 main report. But all of those details, we 4 have tried to make that public, so that 5 everybody has access to them to consider. 6 So let me start with the blue pod. 7 I am -- there was a point-to-point wiring 8 check done of the blue pod SEMS, which are the 9 digital computers inside of the blue pod. And 10 what we found in Phase 2 testing was the 11 point-to-point wiring check did not match the 12 original manufacturer's drawings. So either 13 wires were broken, missing, or had been 14 disconnected at some point in the course of 15 the blue pod's life. 16 That miswiring would have had an 17 effect of establishing one of the two 18 conditions necessary for the AMF/Deadman to 19 fire, and that is loss of electrical power and 20 communication coming from the rig. 21 Now, if you look at the image on 22 the right, the cartoon shows a red box around

Page 42 202-234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. 1 the wiring of the SEM. That miswiring would 2 not have prohibited the blind -- or any of the 3 solenoids from opening, as long as the 27-volt 4 battery was good. But once that condition was 5 set and the AMF/Deadman was turned on at the 6 rig, and that condition was detected by the 7 blue pod SEM, it would have started to try and 8 monitor for the loss of hydraulic fluid 9 pressure. 10 That process of doing that 11 monitoring would have put a drain on the 12 battery, and we believe by the time the 13 incident occurred that that 27-volt battery 14 would have been drained to a point that it 15 would not have been able to have provided 16 enough energy to allow the solenoid valves to 17 open from the blue pod. 18 This, then, leads us to believe 19 that the blue pod was not capable of 20 activating the blind shear ram and carrying 21 out the AMF/Deadman sequence on the day of the 22 incident.

Page 43 202-234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. 1 So then we have to focus on the 2 yellow pod, and this is -- you saw in the 3 video that -- it animated how a solenoid 4 works, and I'll just repeat that briefly here. 5 The solenoids are designed with two redundant 6 metal coils that when current is run through 7 those coils that they produce a magnetic field 8 that then pulls up a plunger allowing 9 hydraulic fluid to flow through. It's the 10 flowing through this hydraulic fluid that then 11 triggers the closure of the blind shear ram as 12 one of the final steps of the AMF/Deadman 13 sequence. 14 The picture that you see on the 15 left is a picture that was taken while the 16 solenoid valve, Y103, responsible for closure 17 of the blind shear ram, was being 18 disassembled. And what you may not be able to 19 see clearly in the photo you should be able to 20 see more clearly in the cartoon at the right. 21 The wiring is supposed to be that 22 -- numbers one and three are supposed to be

Page 44 202-234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. 1 white, and two and four are supposed to be 2 black. Whereas, if you look in the photo, you 3 can see that the opposite is true. And so 4 this was a miswired solenoid valve. 5 One of the key factors that I won't 6 go into detail here, but it's important, that 7 there was a lot -- there were published 8 results of testing of the individual solenoid 9 valve that came out as a result of Phase 1. 10 We learned from information gathered in Phase 11 2 that we had to reinterpret those results, 12 because the miswired solenoid valve could not 13 open. 14 And so we learned during Phase 2 15 that equipment that was being used to test the 16 solenoid valve in Phase 1 was not opening or 17 triggering the valve in the way that we 18 thought. So that's a pretty big -- that is a 19 big change from what you would have learned if 20 you had looked at Phase 2 and gone on to Phase 21 1. 22 Ultimately, what is important to

Page 45 202-234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. 1 remember is that if all of the batteries in 2 the yellow pod were sound at the time of the 3 incident, this miswiring of the solenoid valve 4 would not have allowed the solenoid valve to 5 open. So if that had been the case, then the 6 yellow pod also would have been inoperable on 7 the day of the incident. 8 But we learned two things. When we 9 learned about the testing equipment and the 10 misunderstanding of how the testing equipment 11 worked in Phase 1, we realized that we had to 12 go back and reinterpret the results from 13 Phase 1. There was also information that came 14 out in Phase 2 through tests on the batteries 15 that we realized that the nine-volt -- one of 16 the nine-volt batteries in the yellow pod had 17 died, was almost completely drained. And it 18 was incapable of sending the command to open 19 up the solenoid valve. 20 What we also realized when we went 21 back and looked at Phase 1 is that there were 22 three successful AMF/Deadman tests that were

Page 46 202-234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. 1 completed during Phase 1 testing. And we 2 started to wonder, how could that possibly 3 have occurred? Why would the battery have 4 stopped -- or why would the solenoid have 5 started opening during the AMF/Deadman test? 6 And we started thinking of analogy 7 of anybody in here who might have started a 8 car on a cold day. If you've ever had the 9 experience where you have gone out to your car 10 on a cold day, and you've tried to start your 11 engine and it turns over but the engine -- 12 your car doesn't actually start, but if you 13 wait until later in the day and try it again, 14 your car will start. 15 This is because batteries are 16 affected by the temperature of the environment 17 in which they are performing. So we started 18 to consider the fact that the SEM pods that 19 were being tested at the Michoud facility 20 during Phase 1 testing were operating in 21 temperatures that were around 70 degrees 22 Fahrenheit.

Page 47 202-234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. 1 The temperatures at the bottom of 2 the ocean are closer to freezing, so closer to 3 36 degrees Fahrenheit. And so we started to 4 consider that a battery that barely worked in 5 ambient temperatures that were surrounding the 6 pod at 70 degrees Fahrenheit we felt would 7 have an unlikely ability to function at 36 8 degrees Fahrenheit. 9 And we did battery calculations and 10 drain calculations to show that we believe 11 that the nine-volt battery on the day of the 12 incident had actually drained, one of them had 13 drained, the one that had died, but it in the 14 cold temperatures had drained sufficiently to 15 not be able to send the command to trigger the 16 blind shear ram to open. 17 With that in mind, we had to 18 consider -- we still -- we now believed we had 19 two likely scenarios of the AMF being 20 triggered, but now we need to correlate this 21 in time with the pipe actually being buckled. 22 So there are three different theories that we

Page 48 202-234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. 1 considered. One of them is you could have 2 high flow rate going up through a drill pipe 3 that has at some point broken and lost 4 integrity at the top. Those forces, in 5 addition with forces pushing up on the bottom 6 of the drill pipe, could have caused it to -- 7 could that have caused it to buckle, and that 8 is the image depicted on the left. 9 Then, we have the image on the 10 right. Another possibility is that -- there 11 was witness testimony that equipment holding 12 the drill pipe up at the top of the rig had 13 actually failed. If that were true, then all 14 of the weight of the drill pipe, plus that 15 equipment, would have been pressing down on 16 the pipe rams that were closed around the 17 drill pipe. That's the second possibility. 18 And then, the third possibility is 19 this possibility of effective compression that 20 was just introduced in the animation. After 21 looking at all of the evidence that we had, 22 and considering various options, we believe

Page 49 202-234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. 1 the most likely scenario for pipe buckling 2 happened to be with effective compression, 3 which led us to choose the most likely 4 scenario of the AMF being triggered at the 5 time of the AMF/Deadman. 6 So pipe buckling is actually -- 7 it's not a new phenomenon that the CSB is 8 putting forth. It is actually one that is 9 well recognized in the oil and gas industry. 10 What you're looking at here is a picture of a 11 buckled choke and kill line that was being 12 pressure tested back in the 90s. It was 13 being pressured up to 15,000 psi, and you can 14 see here that it is bowed or buckled. 15 If there is anybody in the room who 16 does casing design or pipeline designs, they 17 could probably attest to having to consider 18 this phenomena because it is a concern in both 19 of those areas. What we did notice is no one 20 has mentioned effective compression in the 21 terms of drill pipe during a well control 22 incident.

Page 50 202-234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. 1 Part of this may be because this is 2 not a phenomena that is easily recognized if 3 you're on the drilling rig. There is no 4 instrumentation that will tell you directly 5 that you have drill pipe buckled in your BOP. 6 So this is a simple flowchart of 7 all the information I just presented to you. 8 We know that the annular preventer was 9 manually activated by the crew at 9:43 p.m. 10 approximately. They then followed that by 11 operating the pipe RAM, which we believe 12 sealed the well bore but caused a substantial 13 increase in pressure inside the drill pipe. 14 That also allowed pressure outside in the 15 annular space outside the drill pipe to drop 16 as that oil and gas in that area progressed up 17 towards the rig. 18 When this happened, when the pipe 19 RAM sealed, we now have the conditions 20 necessary, established, to have the pipe 21 buckled by effective compression. We then had 22 the explosion, which established the

Page 51 202-234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. 1 conditions necessary for the AMF/Deadman 2 system to trigger. We believe that due to 3 miswiring in the blue plod the 27-volt battery 4 was drained by the time of the incident and 5 incapable of actuating the Deadman system. 6 We believe the yellow pod had one 7 SEM battery that was already compromised, and 8 that by operating in the colder temperatures 9 had pushed it to a point that it was no longer 10 able to send the commands to trigger one of 11 the coils. This, then, left the other coil 12 unopposed and able to activate and 13 successfully attempt to close the blind shear 14 ram. 15 Because the blind shear ram was 16 buckled in the drill pipe at the time of 17 actuation, the blind shear ram did not fully 18 close, and in fact punctured the drill pipe 19 and, in reality, reestablished the flow that 20 then continued. 21 So Ms. MacKenzie noticed at the 22 beginning of the presentation that many of

Page 52 202-234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. 1 these shortcomings that we identify in the BOP 2 are really manifestations of safety management 3 system issues. So safety management systems, 4 in the words of other process safety experts, 5 one description is safety management systems 6 are recognized and accepted worldwide as the 7 best practice methods for managing risk. 8 Another expert has noted or 9 described safety management systems are those 10 that provide an organizational framework to 11 help manage critical safety barriers. 12 PSA has expanded this point and 13 described it a little more generally. They 14 say these barriers -- technical, operational 15 and/or organizational elements -- which 16 individually or collectively reduce 17 opportunities for specific error, hazard, or 18 accidents to occur, or which limits the 19 accidents drawbacks or harm. 20 So at the beginning when we 21 mentioned that the manifestations come out in 22 the technical equipment, what the PSA quote

Page 53 202-234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. 1 that I just read really takes into account is 2 that all of these types of barriers, 3 operational barriers, organizational barriers, 4 and technical barriers, play off of one 5 another. And that is actually quite apparent 6 when you think about a piece of hardware 7 equipment like the BOP. 8 We have an action we want the BOP 9 to take. We may actively, manually activate 10 it on a rig, and we want to make sure that it 11 does not fail when needed, shown over there at 12 the right. 13 So we have barriers put in place to 14 make sure that that occurs. We try to 15 recognize design limitations that can be 16 identified during a hazard analysis to ensure 17 that the BOP is not put in a situation it 18 cannot handle. There are inspection and 19 maintenance programs that are put in place to 20 make sure BOP is capable of operating when 21 called up. And, finally, we have drilling 22 crew vigilance and response listed as a

Page 54 202-234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. 1 barrier, because a BOP works best if it's not 2 closing on a flowing well. 3 All of these, or these three that 4 I have presented here, are examples of 5 organizational and operational barriers that 6 help ensure that the physical barrier, the 7 BOP, can actually function. 8 There is a quote that we borrowed 9 from BP. "Even the best barrier will not 10 achieve perfect reliability. It will have 11 holes. These holes can be latent or actively 12 opened or enlarged by the action or inaction 13 of people. The robustness of the barriers 14 changes with time and depends on factors 15 related to people, process, and plant." And 16 I skipped a line. "The holes can be latent or 17 actively opened or enlarged by action or 18 inaction of people." 19 We think this is a very apt quote 20 and why -- highlights why it is so important 21 to have a safety management system for your 22 safety critical elements. So I have shown up

Page 55 202-234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. 1 here two definitions of a safety critical 2 element. First, it is a piece of equipment or 3 an organizational operational barrier whose 4 failure could cause or contribute to a major 5 accident event. 6 Or, secondly, it has a specific 7 purpose to limit the effects of a major 8 accident event. In this case, a BOP actually 9 plays both roles. It is intended to stop a 10 kick from progressing into a blowout, but it 11 also has emergency systems that are intended 12 to activate after an emergency situation has 13 occurred. 14 So we would like to present the 15 idea of looking at how to manage a safety 16 critical element like the BOP with this life 17 cycle approach that you see represented up on 18 the board. 19 The first step of this life cycle 20 approach is actually a hazard analysis to 21 identify, what are your safety critical 22 elements? We are talking about the BOP today,

Page 56 202-234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. 1 but there are many other ones. So a hazard 2 analysis should identify all the sequence of 3 events that could lead -- in this case we are 4 talking about a kick that could then 5 potentially lead into a blowout. 6 Those sequence of events should be 7 clearly documented and include human -- any 8 potential human errors that may occur. If we 9 are going to designate something as a safety 10 critical element, a company might start with 11 a list that it has in a database somewhere. 12 But the important thing is to directly link 13 whatever you say is a safety critical element 14 to the major accidents that it is intended to 15 prevent. 16 Second we have listed is defining 17 a performance standard. So performance 18 standard is the basis for which a safety 19 critical element will prevent or mitigate a 20 major accident event. What we have listed 21 here is that a performance standard can 22 describe the functionality of a safety

Page 57 202-234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. 1 critical element, what is it required to do. 2 It can describe its availability, what will 3 its performance duration time be required. It 4 can describe its reliability, how likely is it 5 to perform upon demand, its survivability, 6 what post-event role must have performed or 7 survived in order to be able to perform, and 8 then also its interactions with other systems, 9 so what other systems must be functional in 10 order for it to be able to function itself. 11 These performance standards can be 12 based on national or internationally 13 recognized industry standards, or companies 14 may also use other various methods or 15 technological solutions to determine and 16 define the performance requirements of their 17 safety critical elements. 18 So compliance with the performance 19 standard is the basis for assuring that a 20 safety critical element will act as a barrier 21 to a major accident event. These activities 22 are conducted, or these performance assurance

Page 58 202-234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. 1 activities are conducted to ensure that the 2 safety critical element is functioning 3 appropriately and complying with the 4 performance standards that have previously 5 been set for that element. 6 And, finally, we list gap closure. 7 Gap closure is meant to encapsulate all the 8 methods employed by the companies to 9 continually monitor their safety critical 10 elements and actually improve upon them. So 11 I'm going to use the BOP as a specific example 12 to walk through this life cycle. And I'm 13 actually going to use an example that was not 14 in play on the day of the incident. 15 So we talk about that -- we mention 16 that you need to identify what your safety 17 critical elements are, and that should begin 18 with a hazard analysis. The hazard analysis 19 completed on the Deepwater Horizon did not 20 address the BOP's design limitations or 21 capabilities. 22 With that being said, what you see

Page 59 202-234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. 1 here is an image of a daily drilling report 2 from the Deepwater Horizon. Highlighted in 3 that pink box over at the left is the drill 4 pipe size that was used on the Deepwater 5 Horizon. That drill pipe size of 6-5/8-inch 6 was not listed as being reliably shearable or 7 not specified as being reliably shearable by 8 Cameron, the manufacturer of the BOP. 9 Now, we know that -- that there 10 were transition employees who are aware of 11 this fact. This is an excerpt from an email 12 that was sent from one Transocean employee to 13 another, and it says, "How can I get the chart 14 attachment to change the color on the 4614 psi 15 for shearing the 6-5/8-inch drill pipe to red? 16 Would Cameron have to edit this chart? This 17 is what Rod wants. He says if we can't shear 18 it, then it should be in red." 19 So Transocean did have -- you could 20 call -- they did have a basic statement that 21 stated that the blind shear rams on the BOP 22 must be capable of shearing the highest grade

Page 60 202-234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. 1 and heaviest drill pipe used on the rig and 2 sealing the well, and it must seal the well in 3 one operation. 4 But what we know happened was that 5 Transocean, aware of this problem of shearing 6 this heavier drill pipe that was used 7 throughout the drilling operation, that they 8 actually developed a two-step workaround. The 9 problem with this two-step workaround is it 10 would have worked for a system called the EDS, 11 where they had an option to close something 12 called the casing shear rams first and then 13 the blind shear rams. 14 The AMF system and the Auto-Shear 15 system, neither one of those had the 16 capability of pre-closing something called the 17 casing shear ram. So that means that they 18 didn't have that two-step process available to 19 them. 20 When we go back and we think about 21 a performance standard, one of the definitions 22 that we talked about is that you could

Page 61 202-234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. 1 include, what were the interactions that your 2 safety critical elements had with other 3 systems? So even though the drilling crew 4 found a two-step process that would work for 5 the EDS system, what they didn't consider is 6 that it wouldn't work for the AMF system or 7 the Auto-Shear system. 8 So that brings us to gap closure, 9 and gap closure is about maintaining -- not 10 only maintaining performance of your safety 11 critical element over time but actually 12 improving upon it. So we talk about active 13 monitoring in the report, and active 14 monitoring is really something completed by 15 all levels of management. It is how they 16 continuously monitor work activities, 17 organizational and operational practices, and 18 systems that impact safety critical elements. 19 So this is formal and informal 20 inquiries. It's not an audit. It's not 21 checking to see that somebody has done what 22 they were supposed to do, but it is actually

Page 62 202-234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. 1 increase and trying to check on the health of 2 the system. Was the two-step workaround 3 process -- was that part of Transocean's 4 organizational or operational goals? And, if 5 not, you would hope that management would be 6 engaging in conversations to discover what 7 those processes were, or what other 8 workarounds were being developed on the rig. 9 We also -- gap closure is about 10 looking at specifically the performance of the 11 BOP. There are mechanical integrity programs 12 that can be set up to ensure that adequate 13 testing, preventative maintenance, and other 14 activities are being conducted on the 15 equipment or the other safety critical 16 elements. 17 One final possibility is there is 18 a possibility of having an additional layer 19 that actually confirms that safety critical 20 elements are being managed effectively, and 21 that is having an independent, competent 22 person verify the activities that are being

Page 63 202-234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. 1 completed. This is something Cheryl will talk 2 again about shortly, and we see already 3 happening with BOPs in current post-Macondo 4 regulations. 5 So I'm not going to walk through 6 all those steps, but I am going to point out 7 a few more other assurance activities that 8 were not conducted on the Deepwater Horizon 9 BOP. 10 The first one is there was a lack 11 of documentation of testing on the BOP's 12 AMF/Deadman system components. So there was 13 a miswired solenoid, and a natural question to 14 ask is, well, who miswired the solenoid? And 15 we actually can't answer that question. We 16 know from looking at documents from Transocean 17 that they don't know either. Was it rig crew? 18 Was it a contractor? Was it -- where was it 19 rebuilt? Who did the miswiring? We don't 20 know because that was never recorded. 21 Another testing that was not 22 recorded was testing of the solenoid valves,

Page 64 202-234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. 1 both in documentation provided by Cameron, the 2 manufacturer, and also that Transocean had its 3 own procedure, instructed users who had 4 rewired or rebuild the solenoid valves to test 5 it, to test one coil, the second coil, and the 6 two coils together. It is impossible that 7 Y103, the solenoid valve responsible for 8 closing the blind shear ram in the yellow pod 9 could have passed that test. 10 While we were reviewing this, we 11 actually came across some interesting 12 observations about testing in general with 13 AMF/Deadman systems. So before the Macondo 14 incident, AMF/Deadman systems were not even 15 required on deepwater drilling rigs. Post- 16 Macondo, they are. So perhaps accordingly, 17 then, best industry practice guidance didn't 18 address testing of the AMF/Deadman systems. 19 Since that -- since Macondo, it 20 has, and there is some recommended testing 21 procedures in EPI-53, the fourth edition. So 22 that testing, what it does is it uses an

Page 65 202-234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. 1 external piece of equipment that -- and they 2 -- to provide power to the SEMS or the AMF or 3 the control pods, and then also hydraulic 4 supply. 5 And what that test says to do is 6 two -- or, sorry, the API test says cut 7 hydraulics and electrical at the same time, 8 and check to make sure that your AMF/Deadman 9 system triggers. That procedure differs from 10 the procedure, at least for this BOP, provided 11 by Cameron. The manufacturer's procedure 12 recommends that you do it in a two-step 13 process. 14 In the first step, indicated up 15 here at the top of this diagram, you are to 16 cut power and communications first, and then 17 wait and ensure that the Deadman system does 18 not fire. And then you cut hydraulic 19 pressure, and you wait and you see that it 20 does fire. 21 Second set of tests, they tell you 22 to do the reverse now. Cut power and

Page 66 202-234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. 1 communications, and wait and make sure the 2 Deadman system doesn't fire. Then, go back 3 and cut hydraulic pressure and wait and see 4 that the Deadman system fires. 5 So the testing or the miswiring 6 that we identified from the point-to-point 7 wiring checks found -- or conducted during 8 Phase 2 testing, this test would have caught 9 that miswiring. If the Deadman system 10 believed that it had already lost power and 11 communications from the rig because of the 12 wiring, or, in this case, the test equipment, 13 what would have happened when you turned off 14 the hydraulic pressure first and waited, the 15 Deadman system would have fired. 16 So had this test been done in this 17 way as opposed to turning off electrical and 18 hydraulic power at the same time, had it been 19 done sequentially, that miswiring would have 20 been detected by this test. And this is, 21 again, the test that is indicated by Cameron, 22 the manufacturer of the BOP.

Page 67 202-234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. 1 There is another difficulty or 2 something I think we should -- that everybody 3 in the industry should consider when they 4 conduct tests by just cutting hydraulic and 5 electrical power at the same time. The 6 Deadman system is designed with redundancy. 7 It is designed that either the SEM-A, so the 8 computer A in the blue pod, or computer B in 9 the yellow -- or computer B in the blue pod, 10 or computer A in the yellow pod, or the 11 computer B in the yellow pod, any one of those 12 four systems should be able to trigger the 13 AMF/Deadman system. 14 So let's think about the Deepwater 15 Horizon system. We know that the yellow -- 16 the two yellow systems could not have 17 triggered, miswired solenoid valve, assuming 18 that it had a good battery at the time. If 19 the 27-volt battery of the blue pod had been 20 good at the time that it was on the rig, it 21 actually would have passed the test and the 22 rig crew would have had no idea that two of

Page 68 202-234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. 1 the systems were inadequate or unable to 2 perform that function. 3 There would have been a misplaced 4 confidence on this -- or a redundancy because 5 it actually wasn't verified. It is possible 6 you could have just one SEM pass -- or trigger 7 the AMF/Deadman system successfully, and all 8 of the other SEMS fail for whatever reason, 9 and the rig crew would have no idea. They 10 wouldn't know if one was functioning 11 successfully or all four. 12 For a system that is one of your 13 last-ditch attempts at preventing or 14 mitigating a major accident event, we feel 15 that this needs to be addressed, this 16 shortcoming needs to be addressed, because, 17 really, ultimately what it means is that the 18 same latent failures found on the Deepwater 19 Horizon BOP could conceivably pass current, 20 new industry-recommended AMF/Deadman system 21 testing today. 22 So I'm going to now turn the

Page 69 202-234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. 1 presentation back over to Ms. MacKenzie. 2 MS. MacKENZIE: In the aftermath of 3 Macondo, a number of regulatory changes were 4 implemented, and industry standards and good 5 practice guidance was developed and revised. 6 These improvements should be commended for the 7 advancements made in efforts to improve 8 offshore safety. 9 One of the most significant changes 10 was the establishment of the safety and 11 environmental management systems, or SEMS 12 rule. The SEMS rule requires operators to 13 develop a safety and environmental management 14 system that incorporates several essential 15 elements, including hazard analysis, 16 management of change, mechanical integrity, 17 and many others. 18 The SEMS rule also generally 19 requires that the operator be responsible for 20 establishing goals and performance measures to 21 carry out an effective SEMS program. Yet the 22 SEMS rule lacks specific language focusing the

Page 70 202-234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. 1 responsible party to identify and establish a 2 comprehensive safety management system for all 3 safety critical elements. These are the 4 technical, operational, and organizational 5 elements. 6 The rule also lacks a requirement 7 for the operator and drilling contractor to 8 reduce risk to a targeted level such as as low 9 as reasonably practicable. These gaps allow 10 companies to ineffectively manage their safety 11 critical elements and yet remain in compliance 12 with the regulations. 13 The components of the safety 14 management system life cycle approach for 15 safety critical elements, as this visual 16 depicts, are not explicitly required for all 17 safety critical elements. For example, within 18 the life cycle safety management system 19 approach is the identification of safety 20 critical elements. 21 As discussed earlier, this is 22 accomplished, first and foremost, through a

Page 71 202-234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. 1 process of conducting a hazard analysis, yet 2 there is no requirement to identify and 3 document all safety critical elements as part 4 of that hazard analysis process. 5 Additionally, the hazard analysis 6 element of SEMS is not focused on targeted 7 risk reduction. Instead, the requirements are 8 activity-based where the hazards identified 9 must be managed, and any resulting 10 recommendations for mitigating or eliminating 11 the hazard must be resolved. 12 A system can be managed but managed 13 poorly. A recommendation can be resolved, 14 completed, or closed out, but the result may 15 not necessarily make things safer. Companies 16 could conduct a weak or inadequate hazard 17 analysis and not identify the appropriate 18 safety critical elements or operating 19 conditions of the safety critical elements, 20 and yet appear to be in compliance with the 21 regulation. This is something the CSB sees 22 again and again in its onshore investigations

Page 72 202-234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. 1 as well. 2 The absence of targeted risk 3 reduction parallels findings in two specific 4 CSB incident investigations that have come out 5 recently on onshore facilities -- the Chevron 6 refinery fire in Richmond, California, and the 7 Tesoro Anacortes Refinery in Anacortes, 8 Washington. 9 While these onshore sites are 10 regulated by agencies other than BSEE, the 11 California Division of Occupational Safety and 12 Health, and the Washington State Department of 13 Labor and Industries, these are both state -- 14 OSHA states -- the safety regulations parallel 15 the SEMS rule, both in the safety management 16 system framework of each, and that the onshore 17 and offshore regulations both lack targeted 18 risk reduction. 19 On August 6th, 2012, at the Chevron 20 refinery, a pipe containing flammable 21 hydrocarbon process fluids ruptured, resulting 22 in a large vapor cloud that ignited, sending

Page 73 202-234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. 1 a large uncharacterized plume across Richmond. 2 Fifteen thousand people sought medical 3 attention from that incident. 4 On April 2nd, 2010, at the Tesoro 5 refinery, a heat exchanger catastrophically 6 ruptured, releasing highly flammable hydrogen 7 naphtha at more than 500 degrees Fahrenheit 8 into a process unit where seven workers were 9 located and fatally injured. 10 In both cases, known hazards were 11 not controlled for or mitigated sufficiently 12 to prevent the tragic accidents from 13 occurring. Yet both companies had conducted 14 the requisite hazard analysis activity 15 stipulated in the regulations. Both of these 16 CSB investigations have incident reports for 17 those who wish to have more details. 18 It is also -- it is significant to 19 note that U.S. offshore voluntary guidance 20 developed post-Macondo support a risk 21 reduction target. API Bulletin 97 provides 22 guidance on the information to be shared

Page 74 202-234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. 1 between the operator and the drilling 2 contractor regarding well construction and 3 rig-specific operating guidelines. 4 The bulletin suggests that as part 5 of the well plan interface document, the risks 6 associated with implementation of the planned 7 well construction activities be identified, 8 and that the prevention and mitigation plans 9 be established for those identified risks in 10 order to reduce the possibility as low as 11 reasonably practical. 12 It goes on to state that these 13 identified risks and prevention mitigation 14 plans are to be communicated to all affected 15 personnel. 16 Furthermore, in August 2013, BSEE 17 proposed to amend and update an existing 18 regulation -- its oil and gas production 19 safety systems regulation -- that speaks to 20 the need for a life cycle approach to managing 21 safety critical equipment. 22 With a focus on production, this

Page 75 202-234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. 1 rule is not applicable to drilling facilities 2 such as the Deepwater Horizon. However, the 3 proposed changes are significant because they 4 highlight the importance of conducting and 5 documenting a life cycle analysis of specific 6 safety and pollution prevention equipment. 7 And while this rule excludes the 8 BOP, a 2013 proposal explicitly requested 9 public comment on the possibility of requiring 10 a similar life cycle analysis of the BOP. 11 This demonstrates an 12 acknowledgement by the regulator of the 13 benefits of a life cycle safety management 14 system approach, albeit for a few specific 15 pieces of equipment. 16 The CSB concludes that all safety 17 critical elements require this approach for 18 the prevention of major accidents. 19 I would now like to ask Don 20 Holmstrom to share the proposed 21 recommendations. 22 MR. HOLMSTROM: Thank you, Cheryl

Page 76 202-234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. 1 MacKenzie. The CSB makes recommendations, and 2 I'm going to read the draft recommendations, 3 subject to approval or voted by the Board that 4 came out of this -- the first two volumes of 5 our Macondo investigation. Once the 6 recommendations are voted on, the CSB has a 7 recommendations group that tracks the 8 recommendations until completion, so the CSB 9 doesn't just issue reports and moves on. We 10 have a mechanism similar to the National 11 Transportation Safety Board to issue 12 recommendations and track them to completion. 13 And the status of those recommendations is 14 also a vote of the Board, whether their open, 15 acceptable response; closed, acceptable 16 action; that's an evaluation by the staff and 17 a vote by the Board. 18 So we -- the recommendations are 19 the mechanism that drives safety change and 20 are very important to the Chemical Safety 21 Board. 22 The first draft recommendation this

Page 77 202-234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. 1 evening is to the Bureau of Safety and 2 Environmental Enforcement, United States 3 Department of Interior. Augment 33 CFR 4 Section 250, Subpart S, to require the 5 responsible parties, including the leasee, 6 operator, and drilling contractor to 7 effectively manage all safety critical 8 elements, technical, operational, and 9 organizational, thereby ensuring their 10 effective operation and reducing major 11 accident risk to as low as reasonably 12 practical. 13 At a minimum, require the following 14 improvements. A, written identification of 15 all safety critical elements for offshore 16 operation through hazard analysis. This list 17 will be made available for audits and 18 inspections before and by the responsible 19 parties. External entities, e.g. independent 20 competent parties, third party auditors, and 21 the regulator, and it will be shared among the 22 leasee, operator, and drilling contractor.

Page 78 202-234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. 1 Identifying all safety critical 2 elements shall ensure the establishment and 3 maintenance of effective safety barriers to 4 prevent major accidents. 5 B, documented performance 6 standards, as defined in Section 5.2 of the 7 Macondo investigation report, describing the 8 required performance of each safety critical 9 element, including its functionality, 10 availability, reliability, survivability, and 11 interactions with other systems. 12 C, augmentation of 30 CFR Section 13 250.1916, to include requirements for all 14 responsible parties, including contractors, to 15 conduct monitoring for continuous active 16 assurance of all identified safety critical 17 elements through each of the safety critical 18 element's life cycles. 19 Also, part of Recommendation R1 to 20 BSEE, documented independent verification 21 scheme for the identified safety critical 22 elements reported to, and it's subject to

Page 79 202-234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. 1 review by the regulator where, one, the 2 dependent party meets BSEE criteria that 3 guarantees its competence and independence 4 from the company or facility for which it is 5 providing verification. 6 Two, the independent verification 7 occurs prior to commencement of the offshore 8 drilling or production activity and 9 periodically as defined by BSEE. 10 Three, all resulting assessments of 11 the independent verification activities will 12 be tracked in a formal records management 13 system. 14 And, four, corrective action shall 15 be taken to address negative verification 16 findings and non-compliance. Verified non- 17 compliance shall be tracked by the responsible 18 party as a process safety key performance 19 indicator and be used to drive continuous 20 improvement. 21 The next recommendation to BSEE, 22 R2, publish safety guidance to assist the

Page 80 202-234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. 1 responsible parties in the fulfillment of 2 regulatory obligations stipulated in R1 for 3 the identification and effective management of 4 safety critical elements -- technical, 5 operational, and organizational -- with the 6 goal of reducing major accident risk to as low 7 as reasonably practical, including, but not 8 limited to, each of the identified minimum 9 requirements, which we identified in R1. 10 Recommendation Number 3 to the 11 American Petroleum Institute. Publish an 12 offshore exploration and production safety 13 standard for the identification and effective 14 management of safety critical elements, 15 technical, operational, and organizational, 16 with the goal of reducing major accident risk 17 to as low as reasonably practical, including, 18 but not limited to: A, development and 19 implementation of a safety critical element 20 management system that includes the minimum 21 necessary shall requirements in the standard 22 to establish and maintain effective safety

Page 81 202-234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. 1 barriers and prevent major accidents. 2 B, methodologies for the 3 identification of safety critical elements; 4 and, two, the development of performance 5 standards of each safety critical element, 6 including its functionality, availability, 7 reliability, survivability, and interactions 8 with other systems. 9 C, establishment of assurance 10 schemes for continuous active monitoring of 11 all identified safety critical elements 12 throughout each safety critical element's life 13 cycle. 14 And, D, fulfillment of independent 15 verification requirements and use of those 16 verification activities to demonstrate 17 robustness of the safety critical element 18 management process. 19 And, E, development of process 20 safety key performance indicators pertaining 21 to the effective management of safety critical 22 elements to drive continuous improvement.

Page 82 202-234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. 1 Recommendation Number R4 to the 2 American Petroleum Institute, revise blowout 3 prevention -- blowout preventer equipment 4 system for drilling wells, API Standard 53, 5 4th edition, to establish additional testing 6 or monitoring requirements that verify the 7 reliability of those individual redundant 8 blowout prevention systems that are separate 9 from the integrated system test currently 10 recommended. 11 This concludes our presentation, 12 and we will now welcome questions from the 13 Board. 14 Thank you. 15 CHAIRPERSON MOURE-ERASO: Thanks. 16 The next item on the agenda is questions from 17 the Board. I wonder if Mr. Griffon has some 18 questions that you would like to beam here to 19 the investigative team. Mr. Griffon? 20 MR. GRIFFON: Yes. Thank you, Mr. 21 Chairman. And thanks to the team for the 22 presentation. It is a bit difficult to

Page 83 202-234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. 1 follow. There is a little delay with the 2 slides and the audio. But, anyway, so some of 3 my questions you may have covered in the 4 presentation, and I apologize, but maybe if 5 you can just expand or reiterate the points. 6 Just a couple of questions. One, 7 I just was wondering if we have any evidence 8 about what is being done at the operational 9 level and whether these global companies are 10 using completely different approaches to 11 managing safety critical elements in the Gulf 12 compared to around the world? And are there 13 any discrepancies of what is being done in the 14 Gulf versus other -- around the world for, you 15 know, these global companies? 16 MR. HOLMSTROM: I'll start it out. 17 This is Don Holmstrom. At the Chemical Safety 18 Board, we adopted practice I think similar to 19 the National Transportation Board and -- 20 Safety Board in terms of our evaluation of 21 what practices are. We recognize there is a 22 wide range of practices, and then there is

Page 84 202-234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. 1 standards and regulatory requirements. 2 And because of the fact that these 3 practices vary considerably from company to 4 company, we focus on making improvements to 5 what we can identify, which are the generally 6 accepted good practices, usually published by 7 a standard-setting body such as American 8 Petroleum Institute, National Fire Protection 9 Association, et cetera. And, obviously, there 10 is international standards that we have looked 11 at and regulatory systems thoroughly the 12 world. 13 So we examine those as sort of the 14 floor of practice and examine whether those 15 particular practices and regulations are 16 sufficient to have prevented the incident 17 occurring given what we have identified in our 18 investigation report. 19 So if one adopts the perspective of 20 minimal compliance, which is often the case in 21 CSB investigations, often when we are 22 investigating an incident it's not the

Page 85 202-234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. 1 companies that are going above and beyond the 2 standards and regulations; it is often 3 somebody adopting a minimal compliance 4 approach. 5 And so if there's gaps in those 6 regulations, and people aren't following or 7 are not implementing -- only the regulations 8 and not going beyond those, and the incident 9 could occur given those gaps and weaknesses, 10 then we make recommendations for improvement. 11 So our typical approach is to 12 identify the practices in the incident that 13 we're investigating, and then look at 14 standards and regulations and see if those 15 need improvement to prevent -- especially when 16 you have a catastrophic incident with I think 17 what everyone would recognize as unacceptable 18 consequences for society, and certainly for 19 those people killed and injured, to prevent 20 that from occurring again. 21 PARTICIPANT: I would add that API- 22 53 is an international standard for BOP

Page 86 202-234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. 1 management, and I suspect when the findings of 2 this report come out that people around the 3 world would be considering some of the points 4 that we have made in our report. 5 CHAIRPERSON MOURE-ERASO: Mr. 6 Griffon? 7 MR. GRIFFON: Thank you. Thank 8 you. And I guess for me it was just as much 9 a curiosity as a -- you know, I just was 10 trying to imagine whether these very large 11 companies would operate a certain way in one 12 area and then, you know, a more limited, less 13 rigorous approach, you know, just because 14 they're in another -- under another regulatory 15 regime. So it was as much of a curiosity as 16 anything. 17 But let me ask the second part, 18 which is going into the SEMS a bit, and I 19 think, Cheryl, I -- this is probably something 20 that you may have even covered or touched on, 21 so maybe just to clarify for me. 22 I think it's in Section 6.1 of the

Page 87 202-234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. 1 report that I wondered if you could describe 2 a little further maybe what BSEE is doing with 3 regard to the SEMS regs. It seems that they 4 have some language at least that is very 5 similar to what we are recommending with 6 regard to safety critical element programs. 7 My sense, and I'm certainly no 8 expert on this regulation, but my sense is 9 that it's probably limited to equipment, not 10 other -- not the broader systems that you 11 talked about. Can you just explain for me 12 further what SEMS -- what is sort of covered 13 in the SEMS approach now and where the 14 deficiencies lie in our view and the 15 justification for our Recommendation R1? 16 MS. MacKENZIE: Sure. Yes. So a 17 subsequent volume of this investigation will 18 be looking at regulatory issues, and we look 19 at SEMS a lot more in-depth in that one -- not 20 just for safety critical elements but beyond 21 that. 22 In this case, regarding safety

Page 88 202-234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. 1 critical elements, it does speak to safety 2 critical equipment, and specifically we 3 highlighted in our report about the need to 4 look at safety critical tasks, the 5 operational/organizational elements that are 6 safety critical for safe operation and 7 prevention of major accidents. 8 The language of SEMS, as we tried 9 to quickly point out in this presentation, 10 allows, without a risk reduction target and 11 some of the language that is used within it, 12 it can allow some -- allow a company, a poor 13 performer, a bad actor, those that we 14 typically have to investigate, to fulfill the 15 requirements on paper and yet perform safety 16 management systems activities in a less-than- 17 stellar or inadequate manner. 18 And when comparing that language in 19 SEMS to regulatory regulations in other 20 offshore regions, we can see distinct 21 differences in the requirements put forward on 22 the -- those creating the risk. And because

Page 89 202-234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. 1 of that, we wanted to -- safety management 2 systems, it's in a safety -- excuse me, safety 3 critical elements is a safety management 4 system in and of itself. And it requires a 5 distinct and explicit requirement in the 6 regulations. 7 DR. MULCAHY: I think I would add 8 to that, too -- and this is Mary Beth speaking 9 -- we know already that BSEE has implemented 10 regulations to have third parties look at the 11 BOPs. But the BOP may not be the cause of the 12 next major accident event in the offshore 13 drilling industry. 14 So we know that there are other 15 systems, the fire suppression systems, 16 diverter systems, that are not receiving the 17 same attention or not given the same attention 18 by the regulations, whereas the approach that 19 we recommend would require it for all safety 20 critical elements. 21 MR. HOLMSTROM: One additional 22 point, Board Member Griffon, I would raise is

Page 90 202-234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. 1 that in SEMS, I'll use the example of the 2 hazard analysis. When we say it's more 3 activity-based than goal-setting, typically in 4 a goal-setting regime you have a goal to, you 5 know, prevent accidents or the goal to control 6 hazards. And in the SEMS element on hazard 7 analysis criteria, 1911, it talks about 8 managing hazard versus an activity. 9 This is different than the language 10 used for example in the process safety 11 management standard, which we also believe 12 lacks a specific risk target. But the PSM 13 standard, which applies to onshore process 14 facilities, like refineries and chemical 15 plants, requires the control of hazards. 16 So SEMS, on the other hand, only 17 talks about manage them, which is an activity 18 and is not a goal-based approach. 19 The other thing on recommendations 20 relative to hazard analysis that talks about 21 resolving recommendations, it doesn't 22 establish a goal to resolve recommendations to

Page 91 202-234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. 1 ensure the prevention of incidents, et cetera. 2 It just talks about resolving recommendations. 3 As we all know, those of us that 4 have participated in hazard analysis, like Haz 5 Ops, often you resolve a recommendation by not 6 addressing it or deciding not to take the 7 action that is recommended by the Haz Op team. 8 That is often -- or can be, you know, an 9 acceptable approach. So using the word 10 "resolve" doesn't -- is not goal-based. It's 11 activity-based. And so we have a specific 12 problem with that, because this is intended to 13 be goal-based, goal-setting-based regulatory 14 activity, but the language used is not goal- 15 setting. 16 MR. GRIFFON: Thank you. I'll turn 17 it back to the Chair. 18 CHAIRPERSON MOURE-ERASO: Okay. 19 Thank you, Mr. Griffon. 20 I only have one question that I 21 direct to anybody on the panel, the 22 investigative panel. The recommendations that

Page 92 202-234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. 1 were made are basically to Department of 2 Interior, to BSEE, to ask BSEE to require 3 offshore operators to manage all safety 4 critical elements requiring improvements or 5 current practices, I could presume. 6 After you were able to conduct your 7 investigation and evaluate other regimes in 8 other countries, and look at what has been 9 done in the United States, in your opinion, do 10 you think that the U.S. offshore operations 11 have the capabilities to implement the 12 improvements that are being recommended? 13 MS. MacKENZIE: Yes. You know, as 14 I had said in the presentation, I think that 15 we can all agree that great change has 16 happened offshore since Macondo. A number of 17 new regulation standards, good practice 18 guidance, have resulted, and that is 19 definitely taking us many strides forward in 20 advances in safety. 21 After SEMS came out, SEMS II came 22 out, which were amendments that further

Page 93 202-234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. 1 strengthened SEMS, and that is why in R1 we 2 make the recommendation to BSEE to amend SEMS, 3 because we feel that this is a way that they 4 can add on to the great start with SEMS, and 5 include a safety critical element management 6 system requirement to ensure that these 7 important elements are managed effectively 8 offshore. 9 CHAIRPERSON MOURE-ERASO: All 10 right. We are doing very well with time. So 11 I think before we enter into the next item of 12 the agenda, the public comments, I am going to 13 take a -- 14 (Brief break) 15 CHAIRPERSON MOURE-ERASO: We 16 continue with the program. 17 Before, I would like observe that 18 here on the table in front of the table of the 19 panel we have some examples of solenoids and 20 part of the equipment that we are talking 21 about in the report, if somebody would like to 22 physically examine them.

Page 94 202-234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. 1 On the agenda, we have this part 2 reserved for public comments. I would like 3 very much to keep the length of the comments 4 to three minutes. There is a lot of people 5 that are on the list that would like to talk, 6 and any extension over three minutes that you 7 are doing, you are taking away from the time 8 of other people, and that we want to keep the 9 proceedings fair. 10 I am going to ask Mr. Richard Loeb, 11 the CSB General Counsel, to lead this part of 12 the public comments. So, Mr. Loeb. 13 MR. LOEB: Thank you, Mr. Chairman. 14 Normally, Daniel Horowitz, our Managing 15 Director, takes this role, so forgive me if I 16 have not been practiced and schooled the way 17 that he has, but I will do my best. But I am 18 learning that the toughest part of this, just 19 reading the list, is some of you, or I guess 20 maybe all of you, should have become 21 physicians, because it's like reading a 22 prescription. I can't quite get it, but I

Page 95 202-234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. 1 will do my best. 2 If I mispronounce your name or your 3 affiliation, I would ask that all of you when 4 you come up to the microphone, which is up at 5 the front towards the panelists, that you 6 state your name and spell your last name, and 7 state your affiliation, because this meeting 8 is being transcribed. 9 So the first speaker is Holly 10 Hopkins from the American Petroleum Institute. 11 MS. HOPKINS: Hi. Good evening. In 12 the interest of time, I'm just going to read 13 a shortened statement. But if I can submit 14 the whole statement for the record, that would 15 be appreciated. 16 Good evening. My name is Holly 17 Hopkins, and I'm a Senior Policy Advisor in 18 Upstream and Industry Operations at the 19 American Petroleum Institute. API appreciates 20 the opportunity to provide verbal comments at 21 the U.S. Chemical Safety and Hazard 22 Investigation Board's public meeting on the

Page 96 202-234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. 1 first two volumes of the CSB report on the 2 April 2010 Macondo incident. 3 API represents more than 600 4 companies involved in all aspects of the oil 5 and natural gas industry, including 6 exploration and production, refining, 7 marketing, pipeline, and marine transporters, 8 as well as service and supply companies that 9 support all segments of the industry. 10 API and our members are 11 significantly affected by the efforts of the 12 CSB and are highly -- and are regularly called 13 upon to respond to and implement the CSB 14 recommendations. 15 The oil and natural gas industry is 16 committed to operating in a safe and 17 responsible manner while minimizing our impact 18 on the environment. Protecting the health and 19 safety of our workers, our contractors, and 20 our neighbors is a more imperative and a core 21 value for our industry. 22 No incident is acceptable. Our

Page 97 202-234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. 1 industry takes every incident seriously. 2 Continued vigilance is essential in helping to 3 prevent future incidents. We agree with Board 4 Member Griffon's comments on the review 5 process and the inadequate time given to 6 review the report and provide comments. While 7 API has not had the opportunity to fully 8 review Volumes 1 and 2 of this report, or its 9 proposed recommendations, we do have the 10 following general comments. 11 The CSB analysis in Volume 2 is 12 focused solely on the BOP, but fails to 13 acknowledge the entire system and the systems- 14 based approach that is essential for sale 15 operations. Despite the focus on the BOP and 16 its technical detail, the report draws 17 conclusions and recommendations related to the 18 entire offshore operating system without 19 presenting a legitimate analysis. 20 The significant safety strides that 21 are directly related to implementation of a 22 systems-based approach must be referenced in

Page 98 202-234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. 1 the report if the report is going to draw 2 conclusions and make recommendations beyond 3 the BOP failure analysis technical findings. 4 API requests the opportunity to 5 submit documents that describe the tremendous 6 progress made by the industry on offshore 7 safety and specifically on progress made on 8 systems-based approach to the CSB. 9 Additionally, there are many 10 comments throughout Volume 2 that compare the 11 U.S. and European regulatory approaches. As 12 API has stated in prior public comments, 13 industry is fully committed to safe 14 operations, both onshore and offshore. This 15 is particularly evident in the standards and 16 programs developed by the industry, 17 specifically Recommended Practice 75 on SEMS 18 and the SEMS resources and initiatives of the 19 Center for Offshore Safety. 20 The U.S. requires SEMS for offshore 21 operations, and the program includes third- 22 party audits. Nothing has been presented by

Page 99 202-234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. 1 the CSB to support a sudden shift to the 2 safety case regime. In other words, the CSB 3 has not demonstrated how a safety case regime 4 will result in a higher level of safety and 5 actual operations over a fully functional and 6 properly managed safety environmental 7 management system, such as described in API 8 Recommended Practice 75. 9 Additionally, all the specific 10 terms and concepts mentioned in the CSB 11 recommendation are included in the SEMS, and 12 were in fact commonly in practice before the 13 SEM regulatory requirement. 14 In the four years since the Macondo 15 incident, and CSB began its investigation, the 16 oil and natural gas industry has methodically 17 examined every aspect of offshore safety 18 measures and operations to identify potential 19 improvements in spill prevention, 20 intervention, safety management, and response 21 capabilities. 22 The process started immediately

Page 100 202-234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. 1 after the 2010 spill when industry, in 2 cooperation with federal regulators, launched 3 a systematic and comprehensive review. We 4 convened four joint industry task forces to 5 scrutinize all facets of the offshore drilling 6 process, from equipment and operating 7 procedures to subsidy well control and oil 8 spill response. 9 Working with the U.S. Department of 10 Interior, as well as the Presidential Oil 11 Spill Commission, industry experts developed 12 new recommendations and standards that guide 13 operations in both deep and shallow water 14 exploration. 15 Drawing on lessons learned from 16 Macondo, we revised existing standards and 17 created several new ones, including standards 18 dealing with well design, cementing, blot 19 prevention, subsidy equipment for capping 20 wells, and protection for oil spill response 21 workers. 22 One of the first recommendations

Page 101 202-234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. 1 implemented was boosting rapid subsidy 2 response capability for well containment. 3 Thanks to the establishment in 2010 of new 4 collaborative containment companies, state-of- 5 the-art containment technology can be deployed 6 quickly in the event of a spill. 7 The Center for Offshore Safety was 8 created in 2011 to promote the highest level 9 of safety for offshore drilling completions 10 and operations, fully dedicated to safety 11 management and safety culture, as recommended 12 in the Presidential Commission Report. 13 The Center works with the 14 independent third party auditors and 15 government regulators to reinforce the 16 industry safety culture, support good, safety 17 management audit tools and audit practices, 18 and ensure good operational safety practices 19 are communicated throughout the industry. 20 The Bureau of Safety and 21 Environmental Enforcement has already adopted 22 three of the Center's guidelines in its own

Page 102 202-234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. 1 regulations. The Safety Bureau is one of the 2 three new agencies formed from the 3 reorganization of the federal former Minerals 4 Management Service in response to Macondo, and 5 in recent congressional testimony the Safety 6 Bureau's Director, Brian Salerno, stated that 7 25 of the 33 BP Deepwater Horizon Commission 8 recommendations have been addressed or are 9 being addressed through ongoing initiatives 10 including rulemakings. 11 Offshore development is an 12 important element in realizing our full 13 potential as an energy superpower. Even one 14 incident is too many, and the oil and gas -- 15 natural gas industry has dedicated the past 16 four years to using the lessons learned from 17 Macondo to enhance safety and operational 18 practices. 19 To quote the co-chairs of the 20 Presidential Oil Spill Commission, offshore 21 drilling is safer than it was four years ago, 22 because industry and the government are

Page 103 202-234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. 1 working together to improve spill prevention 2 and response, implementing new rules, and 3 fostering a strong culture of safety within 4 the industry. 5 In closing, any incident is both 6 one too many and a powerful incident for API 7 and industry to improve training, operating 8 procedures, technology, and industry 9 standards. Our thoughts will always remain 10 with the families of all those who lost their 11 lives in this tragic incident, and we stand 12 ready to continue to work with government 13 regulators to improve safety. 14 Thank you. 15 MR. LOEB: Thank you, Ms. Hopkins. 16 Our next speaker is Charlie 17 Williams, and could you state your affiliation 18 when you're up at the mike. 19 MR. WILLIAMS: So I'm going to do 20 an abbreviated version as well. So good 21 evening. My name is Charlie Williams. I'm 22 Executive Director for the Center for Offshore

Page 104 202-234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. 1 Safety. COS appreciates the opportunity to 2 provide verbal comments to the U.S. Chemical 3 Safety Enhancement and Investigation Board's 4 public meeting on the first two volumes of the 5 CSB report on the April 20, 2010, Macondo 6 incident. 7 No incident is acceptable. Our 8 industry takes every incident seriously. 9 Continued vigilance is essential to helping 10 prevent future incidents. The COS was 11 established by the industry to ensure that our 12 commitment to improvement continues and that 13 there is a single group singularly focused on 14 SEMS, and that there is a group that is 15 responsive to the Presidential Commission's 16 recommendations on safety and safety culture. 17 The industry is committed to 18 ensuring that SEMS is a continuous learning 19 and enhancement process. Thus, a key mission 20 of the COS is enabling the sharing of industry 21 knowledge of SEMS and safety. These learnings 22 will be based on SEMS audits, safety

Page 105 202-234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. 1 performance indicators, and learning from 2 incidence data that includes near misses. The 3 SEMS audits are done by independent third 4 party auditors. 5 While COS has not had an 6 opportunity to fully review Volumes 1 and 2 of 7 the report, or its proposed recommendations, 8 we do have the following general comments. 9 The CSB analysis in Volume 2 is focused on the 10 BOP and, in particular, the technical aspects 11 of the BOPs. Yet well control in particular, 12 and safe operations in general, or an entire 13 system of technology, people, and processes, 14 and, thus, a systems-based approach is 15 essential for safe operations. 16 The focus could not be just on the 17 equipment. The report itself notes that many 18 safety systems processes were done at Macondo, 19 like hazard analysis, barrier analysis, and 20 management of change. Thus, the report should 21 do more to analyze these safety management 22 processes and make recommendations on how they

Page 106 202-234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. 1 could be enhanced and made more effective. 2 Yet the majority of the report is 3 on the technical details of a single piece of 4 equipment. Significant strides in safety are 5 directly related to implementation of systems- 6 based approaches, SEMS, and operationalizing 7 these systems in the field. There is no 8 discussion or recognition of the significant 9 SEMS enhancements in work by the industry, the 10 regulator, and the industry organization. COS 11 requests the opportunity to submit documents 12 to CSB that describe the COS SEMS progress 13 made by the industry regarding offshore 14 safety. 15 SEMS II is a regulatory 16 requirement. COS documents in API-RP 75 are 17 referenced in the regulations. And audits and 18 reporting on SEMS is required. The CSB 19 recommends a sudden shift away from SEMS 20 without clear explanation and analysis of why 21 or how another system will be more effective. 22 We believe that all the ideas, concepts,

Page 107 202-234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. 1 practices, and benefits of other forms of 2 safety management currently exist in SEMS and 3 the regulation. 4 SEMS and SEMS-A is being 5 implemented and enhanced offshore, has 6 benefits of being an active learning and 7 feedback safety management system with a focus 8 on being fully operationalized and 9 continuously benefiting the work and staff in 10 the field. 11 Additionally, SEMS has the benefits 12 of focusing on managing barriers, taking a 13 systematic approach to all parts of offshore 14 safety, and active monitoring. SEMS also has 15 both internal auditing and auditing and 16 verification required by regulation and done 17 by third parties. Significantly SEMS focuses 18 on the importance of leadership and the 19 interaction of leadership with staff to 20 deliver the safety culture we want. 21 We feel that the efforts going 22 forward should be put into continuous learning

Page 108 202-234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. 1 and enhancement of SEMS. We feel that an 2 important contribution of the CSB report will 3 be the analysis and recommendations on how 4 SEMS and SEMS processes that have been and are 5 in place can be more effective. 6 In closing, any incident one -- any 7 incident is both one too many and a powerful 8 incentive for COS and the industry to improve 9 SEMS and learning processes, skills and 10 knowledge, operating procedures and standards, 11 and the effectiveness and measures and audits. 12 Our thoughts will always remain 13 with the families and all of those who lost 14 their lives in this tragic accident, and we 15 stand ready to continue to work with the 16 government regulators to improve safety. 17 Thank you. 18 MR. LOEB: Thank you for your 19 comments, Mr. Williams. 20 Our next speaker is Mr. Kenneth 21 Arnold of the Society of Petroleum Engineers. 22 MR. ARNOLD: Hello. My name is

Page 109 202-234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. 1 Kenneth Arnold. That's A-R-N-O-L-D. I'm 2 representing the Society of Petroleum 3 Engineers, and I was also one of the three 4 reviewers who submitted our peer review of the 5 report last Tuesday, which I suspect didn't 6 make it into the final version, but I just got 7 the final version and I haven't seen how you 8 address the comments. 9 The CSB asked the Society of 10 Petroleum Engineers to do a peer review on the 11 May 5th draft. As you may know, SPE is not an 12 advocacy organization, but is a professional 13 society of individual engineers and 14 scientists. Our mission is to provide 15 networking and knowledge-sharing opportunities 16 for our global membership, and we represent 17 ourselves and not our individual companies. 18 We commend the CSB for completing 19 such a comprehensive review of this tragic 20 incident, and share your hope that the 21 learnings can be adopted by operators, 22 drilling companies, and service companies in

Page 110 202-234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. 1 the future, to prevent recurrence. We were 2 able to send the draft to three SPE members 3 who are recognized experts in the field for 4 their review, but we could not perform a full 5 SPE Board-approved peer review in the one week 6 that was allotted to us. 7 On May 27th, SPE submitted the 8 comments from the independent reviewers 9 dealing what these three individuals thought 10 were serious problems with these volumes. 11 Some common themes in the feedback emerged. 12 First, the team believed that the 13 CSB has done a good job at explaining the 14 technical issues of the solenoids and the 15 buckling of the drill pipe that has not been 16 adequately addressed in the past. 17 Two, there are many comments in the 18 volumes that compare the U.S. and European 19 regulatory frameworks that the team believed 20 warrant more evaluation and examples to prove 21 the contention that a redirection of the U.S. 22 regulatory framework to require identification

Page 111 202-234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. 1 specifically of SCEs and MAEs and verbiage to 2 prove a LARP will result in a higher level of 3 safety in actual operations. 4 The individual reviewers did not 5 think this point was valid at all. The full 6 comments include specific examples of where 7 the report has failed to prove this point in 8 Volumes 1 and 2. 9 The team believed that there are 10 some important items and assumptions that may 11 be technically incorrect, and that the CSB 12 should consider these before publishing the 13 final report. Specifics of these items are 14 included in the full comments which we 15 submitted to you on May 27th. 16 The team acknowledges that some, 17 but certainly not all, of the comments 18 resulting from this initial review may be 19 addressed in Volumes 3 and 4. For this 20 reason, we feel that the volumes are so 21 interrelated that all four volumes are 22 required to paint the full picture.

Page 112 202-234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. 1 It is possible that releasing the 2 Executive Summary and Volumes 1 and 2, before 3 releasing Volumes 3 and 4, would provide an 4 incomplete analysis that could lead to 5 inadequate and misguided actions. 6 Also, during the completion of 7 Volumes 3 and 4, it will probably be found 8 necessary to make revisions to Volumes 1 and 9 2 because of the interrelated nature. 10 In summary, SPE, as a technical 11 organization, believes these volumes of the 12 report should not be approved by the Board 13 until the questions raised by our reviewers 14 and others have been properly vetted and the 15 remaining volumes of the report are written, 16 reviewed, and vetted as well. 17 Thank you very much. 18 MR. LOEB: Thank you, Mr. Arnold. 19 The next speaker -- and thank you 20 so much for spelling your name and restating 21 your organizational affiliation -- is Rudolfo 22 Maya from Dupont.

Page 113 202-234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. 1 MR. MAYA: No comment. 2 MR. LOEB: Oh. No comment? Okay? 3 Well, going down the list, it's Lillian 4 Espinosa, yes, of Deepwater Horizon Study 5 Group. But I may have misstated that, so 6 please when you reach the mike let us all 7 know. 8 MS. ESPINOSA: Yes. I had the 9 honor and privilege of being a member of the 10 Deepwater Horizon Study Group. And we 11 actually had some of the survivors in the 12 early hours long before the NBI inquiry. 13 So today I will probably come -- I 14 thought I was coming, you know, just to see 15 about Volume 1 or 2, but I realize now I am 16 here as much for the survivors, some of whom 17 thought about talking to CSB, but not sure 18 that they can trust it. 19 The manslaughter trial, the hearing 20 is July 9th, so, you know, this thing is not 21 over. One of my questions -- did you all go 22 over any of the evidence from Phase 1 and 2

Page 114 202-234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. 1 from the civil trial? Cheryl, did you use any 2 evidence from Phase 1 and 2? 3 MS. MacKENZIE: Yes. Yes, yes. 4 MS. ESPINOSA: You know, my heart 5 says that maybe Ken Arnold is right. It would 6 be better to issue all four volumes. Like 7 trust is a really important thing. 8 And also, you know, I thought you 9 all were going to really focus on the human 10 factor. And I know this is just a technical 11 safety critical equipment, but I think it 12 would be such a greater impact if you issued 13 all four volumes. 14 MR. LOEB: Thank you very much, Ms. 15 Espinosa. 16 Our next speaker is Jacqueline 17 Weaver of the University of Houston Law 18 School. 19 MS. WEAVER: I thought that was 20 just a sign-in sheet. 21 MR. LOEB: Oh, well, yet another 22 one.

Page 115 202-234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. 1 MS. WEAVER: (Inaudible) 2 MR. LOEB: Well, I don't know if 3 that was picked up, but the next speaker I 4 think is Darryl -- is it Fett of Total? 5 MR. FETT: Yeah. I started as one 6 that also thought it was a sign-up list, but 7 I greatly appreciate the opportunity to talk 8 to you guys, because -- well, first of all, 9 let me introduce myself. I'm Darryl Fett. 10 I'm with Total E&P USA. 11 About 25 years in the industry, and 12 I work in drilling and completions as senior 13 drilling and wells advisor. But a lot of my 14 background is fluids and cementing. 15 And just a disclaimer, I am 16 speaking on behalf of myself and my own 17 personal thoughts and opinions and not those 18 of my company. 19 I'd like to focus a bit -- there 20 was quite a lot of discussion in the report 21 and today about the last line of defense, but 22 I want to speak briefly on what should have

Page 116 202-234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. 1 been and was designed to be the first line of 2 defense, and that's the cement job. 3 In the report, I want to refer to 4 page -- just for your records, to page 23, 5 where it defines the cement at the -- in the 6 annulus and the cement at the bottom of the 7 casing. In the presentation, it was also 8 referred to as sort of independent things -- 9 cemented annulus as being one barrier, cement 10 at the bottom of the casing being another. 11 You specifically refer to it as the 12 shoe track. And just a bit of education 13 because this isn't the first report that has 14 referred to the shoe track cement as the 15 barrier that failed. It was not. The barrier 16 that failed was the primary cement, and they 17 are not two distinct systems anyway. It is 18 all pumped as one slurry, and it's referred to 19 the primary cement job. 20 The purpose of the shoe track 21 cement is not necessarily to prevent the flow 22 of anything into the well bore. The purpose

Page 117 202-234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. 1 of the shoe track is it's a container that 2 captures contaminated cement from wiping the 3 casing with mud. So by design, it is supposed 4 to have contaminated -- be contaminated with 5 mud. 6 Therefore, it shouldn't be expected 7 to contain flow inside the casing. What it is 8 designed for is so that competent cement can 9 be in the annulus and prevent the flow of 10 hydrocarbons into the annulus in either 11 direction, up or down, depending on where the 12 flow path of the load may be. Hopefully, it 13 doesn't go anywhere, but there has been a lot 14 of reference to the failure of the shoe track 15 cement, and I'd really like to correct that in 16 future references to the failures of the 17 barriers. 18 One more thing. In your list on 19 page 18 of barriers, as well as the 20 presentation slide, you refer to all of the 21 types of barriers that we use, but there is 22 one -- there is two distinctions that I want

Page 118 202-234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. 1 to make. You said cement placed at the bottom 2 of the well to seal a hydrocarbon-bearing 3 zone. Again, in context, I take that to mean 4 that you are talking about the shoe track 5 cement. 6 It is not placed there separately 7 than the primary job. If it's not, if you're 8 talking about a cement plug, which is a 9 separate operation, that is the type of 10 barrier that we place there inside the well 11 bore separately than the primary cement job. 12 There is also a key omission here. 13 There is a mechanical barrier, either bridge 14 plug, cement retainer, or there are several 15 names for them, but essentially they are steel 16 or composite material that is placed in the 17 well bore to act as another barrier. 18 And I have to comment the drilling 19 safety rule, there was one of the -- in my 20 opinion, one of the best new regulations is 21 that we have to place a mechanical barrier, 22 another mechanical barrier above what is

Page 119 202-234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. 1 called our blow collar or our top plug in our 2 final casing string. 3 Just for the reason that I'm 4 talking about, is that that system that is 5 inside the casing at the end of a cement job 6 is never intended to prevent flow of 7 hydrocarbons. We normally drill it out 8 anyway. So in the final casing string you 9 have to put another mechanical barrier before 10 you put any negative load on it, and that's 11 why we do it, because it's another system. 12 So I would suggest maybe putting 13 cement plugs as another type of barrier that 14 we use. 15 Thank you. 16 MR. LOEB: Thank you. Thank you 17 very much, Mr. Fett. 18 Our next speaker is Ted Wilkerson. 19 MR. WILKERSON: No comment. 20 MR. LOEB: Oh, okay. We are going 21 through the list really quickly. 22 Dr. Malcolm Sharples of the

Page 120 202-234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. 1 Offshore Risk and Technologies. 2 DR. SHARPLES: I, too, thought it 3 was a sign-up sheet. But given the 4 opportunity, I would like to compliment you on 5 this new piece of technical evidence that you 6 have brought to light. Very, very helpful. 7 I would also like to say I do agree 8 with some of the other speakers in that I 9 think this is a bigger issue, particularly the 10 issue of safety culture, which doesn't seem to 11 be addressed. And on the -- and in regard to 12 that, particularly the area of sort of social 13 psychology to group-think, and, you know, when 14 one keeps seeing recommendations to doing 15 HAZIDs (phonetic), a lot of the -- whether a 16 HAZID is good or not depends upon the people 17 that are there and their experience. 18 And quite often you end up with 19 HAZIDs being conducted on the basis that 20 people are in the room, but those people don't 21 necessarily have the depth of knowledge, 22 particularly of the incidence and accidents.

Page 121 202-234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. 1 And I think that's an important area to do 2 something about. 3 I was curious why you just focused 4 on the BOP instead of things like the float 5 equipment, which also may have failed. 6 Perhaps that would have been a good thing to 7 look at, and perhaps no one seems much to have 8 focused on the regulation, which requires that 9 you -- you know, you have to pump something 10 down the well, like the lost circulation pill, 11 before you pump it overboard, which, as I 12 understand it, was one of the things that 13 blocked the kill line. 14 Nobody has talked much about that, 15 and whether repealing that requirement might 16 be a benefit in the future. 17 Thank you. 18 MR. LOEB: Thank you very much, Dr. 19 Sharples. 20 Our next speaker is John Morawetz 21 of the International Chemical Workers Union. 22 Welcome back, Mr. Morawetz.

Page 122 202-234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. 1 MR. MORAWETZ: Always a pleasure. 2 Well, one, it is always a pleasure, and it's 3 always interesting to hear the reports from 4 various investigators or supervisors and the 5 Board. These are very serious incidents, and 6 the ones that you have tackled here has not 7 just an occupational angle, not just an angle 8 for a small town, but nationwide and worldwide 9 significance given the scale of the 10 environmental damage in the release of the oil 11 over such a large area over such a long period 12 of time. 13 I don't rise to speak to say that 14 I know much about this particular report or 15 the industry technically. I think it would be 16 just inappropriate for me to say that. But, 17 clearly, it was very interesting, I think this 18 is a public meeting for the laypeople to see 19 this report, to see that it's not quite so 20 simple. It's not just one thing that fails, 21 and it was educational to see the questions of 22 the solenoid failure, the battery, the

Page 123 202-234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. 1 interactions, and I think that regardless of 2 the integral findings, seeing where things can 3 be put in place thoughtfully, that would 4 prevent these type of events from occurring, 5 I think is very important. 6 For instance, I am quite amazed 7 that -- if I got this right, that there is no 8 procedures for testing the batteries that are 9 placed 5,000 feet under the water, operate at 10 46 degrees Fahrenheit. I just find it 11 dumbfounding. I mean, you can set up a system 12 to see if it works, but that you don't say -- 13 in that kind of situation that you don't test 14 it beforehand I find very strange. 15 And just another comment that what 16 we're doing here is trying to prevent a 17 similar thing from happening. I don't think 18 the Board is mandated to, nor should it, try 19 to pass judgment on a whole industry. And I 20 don't take your comments that you are doing 21 that. You are looking at a particular event, 22 trying to examine it, find the root causes,

Page 124 202-234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. 1 and find recommendations. 2 I am a little bit troubled and torn 3 as to what to do in a report that I don't 4 think you have ever done before of two reports 5 and two more coming. I would just suggest 6 that there are a couple of ways to deal with 7 that. You could provisionally accept it 8 pending thoughtfulness on the part of the 9 Board and the staff to examine the comments 10 here today, and the written comments you 11 received. Or you could accept it and just 12 make changes later. It is a difficult 13 question given that there could be 14 interrelations between them. 15 But, anyway, thank you very much 16 for the presentations. 17 MR. LOEB: Thank you very much, Mr. 18 Morawetz. 19 We have one more in-person speaker. 20 I apologize. I just can't read your -- your 21 handwriting. From Transocean is all I can 22 read. Someone from Transocean? Okay. Well,

Page 125 202-234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. 1 that may -- oh, I was about to go on to people 2 who may wish to speak who are not on the 3 speakers list. You are welcome to speak now, 4 subject to the -- 5 MR. DAVIDSON: (Inaudible) 6 MR. LOEB: Yes, if you could, so we 7 could all hear you -- at the microphone, and 8 if you can spell your name, your last name 9 especially, and your affiliation, if you have 10 one. 11 MR. DAVIDSON: My name is Michael 12 Davidson. That's got to be the easiest name 13 in the world. And I work for Drill Science, 14 and I'm a petroleum engineer, and I want to 15 applaud you all for hiring Stan, he -- and 16 your report. 17 I think the determination of the 18 buckling is a very simple root cause. And 19 determining that -- identifying a safety 20 critical element I think is key as well. And 21 with that in mind, the BSEE put in the 30 -- 22 in their final ruling in the 30 CFR 250 a

Page 126 202-234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. 1 requirement for the very negative pressure 2 test that causes -- which it wasn't actually 3 required -- you can correct me if I'm wrong -- 4 before. Now it is, but the safety critical 5 element that caused all this is not required. 6 So we are now required to do 7 something without the safety critical element, 8 so you nailed that one on the head. What I'm 9 referring to is the safety critical element 10 that would have prevented the buckling, and 11 also its absence would have prevented killing 12 the well even if the BOP had functioned. And 13 that is that the drill string, the depth 14 between the deepest untested barrier and the 15 drill string that would have killed the well 16 has to be minimized. 17 It was three miles above the 18 deepest untested barrier at the time of the 19 test. That is your safety critical element, 20 and I think I would encourage you to point 21 that out to the BSEE. And I'm a proponent of 22 the safety case. I think the safety case needs

Page 127 202-234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. 1 to be tied to hazard levels and the safety 2 critical element that you brought. I never 3 even thought of that, but I think that's the 4 correct way to approach the safety case would 5 be hazard levels at different operational -- 6 on the timeline. 7 And I think you briefly touched on 8 the fact that some of the operations need to 9 be certified or signed off on, and I think the 10 engineer that designed the negative pressure 11 test on the very next well needs to sign off 12 on it. And that's it. 13 MR. LOEB: Thank you, Mr. Davidson. 14 Is there anyone else in the 15 audience who has not made a comment who would 16 like to make a comment? In that case, I would 17 -- oh, we've got at least one more. We've got 18 at least one more. No, no, that's one of our 19 staff. 20 (Laughter) 21 Even with these bright lights, I 22 recognize them.

Page 128 202-234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. 1 MR. GALLANDER: I'm going to be 2 like Van Morrison. He always starts his 3 concert off with his back to the group. Okay? 4 So my name is Frank Gallander. As of 4:00 5 this afternoon, I am a private citizen. Okay? 6 Now, I've got specific questions in 7 regard to the report that I'm going to go down 8 the line and ask these ladies and gentlemen 9 specifically for answers. And this has to do 10 with your report. 11 So I would like to go with the 12 easies first, and I will start off with Ms. 13 MacKenzie. You mentioned the pod, the 14 temperature outside the pod, was 36 degrees. 15 Do we know for a fact the temperature inside 16 the pod? 17 DR. MULCAHY: No, we don't, but we 18 can surmise. We have some evidence that has 19 come out of people discussing what they 20 thought the temperatures were, and we -- 21 MR. GALLANDER: Based on? 22 DR. MULCAHY: Based on readings of

Page 129 202-234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. 1 some vessel temperatures that were taken at 2 another time, and also based on somebody's 3 experience. 4 MR. GALLANDER: Okay. Because 5 sometimes the temperature inside gets warmer 6 because of the electronics and everything that 7 is involved. 8 DR. MULCAHY: Certainly. 9 MR. GALLANDER: So the 36 degrees, 10 the barrier life, and all this stuff, comes 11 into question, right? 12 DR. MULCAHY: Well, and point that 13 we -- I don't actually -- 14 MR. GALLANDER: I think that's a 15 yes or no. Yes? No? 16 MR. LOEB: Excuse me. 17 MR. GALLANDER: The question -- 18 MR. LOEB: Excuse me. I want to -- 19 you are -- feel free to ask the staff 20 questions. This is not an interrogation of 21 the staff, however. 22 MR. GALLANDER: Oh, I'm --

Page 130 202-234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. 1 MR. LOEB: Okay. 2 DR. MULCAHY: Well, it's -- I want 3 to be careful about just saying yes or no, and 4 there's a reason why. 5 MR. GALLANDER: Okay. 6 DR. MULCAHY: The pod operated at 7 -- it is going to -- the electronics will give 8 off heat, and the temperature will rise. The 9 environment of the actual battery is not 36 10 degrees or close -- you know, at freezing. 11 But there is a thermal difference, and the 12 ocean is a large heat sink. So it's also not 13 going to be warm at the surface at a 70-degree 14 Fahrenheit ambient temperature. It will be 15 warmer on the surface than it will be at the 16 -- on the sea floor. 17 MR. GALLANDER: Right. And that's 18 what I was going for. 19 DR. MULCAHY: Yeah. 20 MR. GALLANDER: But, you know, the 21 assumptions in the report was basically it was 22 36 degrees inside the pod where the batteries

Page 131 202-234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. 1 were located. 2 DR. MULCAHY: That's actually not 3 correct. The assumption was not that it was 4 36 degrees inside the pod. On the outside of 5 the pod, it was 36 degrees. The full 6 technical analysis in the appendix is very 7 clear about that. 8 MR. GALLANDER: Okay. Well, I 9 haven't seen the appendix. 10 DR. MULCAHY: It addresses it in a 11 footnote. I can point it out to you before 12 you leave if you're interested. 13 MR. GALLANDER: Okay. Well, that 14 would be fine. I will go to the next question 15 to Dr. Mulcahy. Is that right? 16 MS. MacKENZIE: This is -- 17 DR. MULCAHY: I'm Mary Beth 18 Mulcahy. 19 MR. GALLANDER: Oh, sorry. Okay. 20 Okay. I'll stay with you, then. So I'm going 21 to go through, and you mentioned Auto- 22 Shear/Deadman's, and AMF, and all this. So

Page 132 202-234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. 1 there are three different systems out there. 2 There's the AMF, there's the Deadman/Auto- 3 Shear, referred to as the DMAS, and there is 4 the EHBU. 5 Each one of these are supplied by 6 each of the different major manufacturers. So 7 of these, how many of these manufacturers 8 require battery operation similar to the 9 system that you are evaluating? How many of 10 these have a system that is similar in their 11 design that require the use of batteries to 12 operate? 13 PARTICIPANT: Are we talking about 14 Macondo or just -- 15 DR. MULCAHY: Yeah. Are you 16 talking about worldwide, or are you -- 17 MR. GALLANDER: I'm talking about 18 Macondo. 19 DR. MULCAHY: -- talking about -- 20 MR. GALLANDER: This knocks on to 21 the -- goes back to the regulations that -- 22 which I'm going to lead to next. And it's not

Page 133 202-234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. 1 an interrogation. I'm just asking for 2 clarity, because -- 3 CHAIRPERSON MOURE-ERASO: Three 4 minutes. 5 MR. GALLANDER: -- and the reason 6 I'm asking -- okay. The reason I'm asking the 7 question is because the recommendations out of 8 the group was to go to the regulations about 9 stricter testing and all of this other stuff. 10 When I looked at that, I assumed 11 that the drive was to get all of them to test 12 it the same way you could test this one, but 13 they're not all the same is what I'm trying to 14 say. 15 DR. MULCAHY: No. So I think that 16 would -- if that was the impression, I 17 apologize that's what you took it as. So this 18 is -- we have analyzed a Cameron BOP. Other 19 BOP manufacturer don't even use the same 20 solenoid -- 21 MR. CHRISMAN: The Mark II 22 specifically.

Page 134 202-234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. 1 DR. MULCAHY: Yeah, the Mark II 2 specifically. Thank you, Stan. Other BOP 3 manufacturers don't use the same redundant 4 solenoid design. For example, part about 5 doing a hazard risk assessment with a targeted 6 risk reduction in the way that we recommended 7 is that we don't believe all BOPs should be 8 treated the same. 9 I find one of the more interesting 10 conversations in the report is the question 11 of, should you have two blind shear rams, or 12 should you not? So we are saying that 13 sometimes we think it is the safest choice, 14 and sometimes the risk assessment might 15 determine that it's not the safest. No 16 regulation is a one size fits all. 17 There are prescriptive regulations 18 that everyone should follow, but the goal of 19 a risk-based regulation or performance-based 20 is that people choose what is the safest for 21 their environment. Not all wells have the 22 same characteristics. This is not a one size

Page 135 202-234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. 1 fits all solution, and that's why we don't 2 recommend a one size fits all solution in our 3 recommendations. 4 We expect you and want you to do 5 the hazard analysis for your specific well, 6 your BOP, do you have the rechargeable 7 batteries, do you not? Do you contract out 8 your rebuilding of your solenoids, or do you 9 do it in-house? This is not a one size fits 10 all. This is every individual operation needs 11 to be assessed. 12 MR. GALLANDER: Well, then -- okay. 13 Then the recommendations for the regulators 14 and stuff may have to be revisited because the 15 implied verbiage implies they are all equal is 16 what I read. And that was my point. 17 DR. MULCAHY: Thank you. 18 MR. GALLANDER: Okay. 19 DR. MULCAHY: I can certainly look 20 at that. 21 MR. GALLANDER: And I noticed -- I 22 noticed the video that you all had there,

Page 136 202-234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. 1 while we were trying to find the slideshow and 2 everything, and I know we've had discussions 3 about this, but the excessive compression 4 discussion, did we look at the -- when you 5 looked at the excessive compression -- and 6 this is all through the report, and it's a 7 very telling statement, but when you look at 8 the excessive compression, on the 6-5/8, 32- 9 pound, looking at the wall thickness, how much 10 pressure it would have taken to achieve the 11 amount of compression, differential, and you 12 do have pressure because the annular was 13 closed and the ram was closed. 14 DR. MULCAHY: Yep. 15 MR. GALLANDER: How much pressure 16 did it take to go inside the pipe to actually 17 get that deflection to go that far? 18 DR. MULCAHY: It was the pressure 19 that was measured on the drill pipe. So we 20 used real drill pipe data that was transmitted 21 from the Deepwater Horizon and collected 22 onshore. That was the basis of the modeling

Page 137 202-234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. 1 that we did. 2 MR. GALLANDER: Okay. So when you 3 did the modeling, then, you could see in that 4 20-foot section between the annular and the 5 ram, where it was closed, that you would get 6 that much excursion from the center weld bore 7 all the way up against the -- 8 DR. MULCAHY: Yeah. I'll let you 9 answer that one, Stan. 10 MR. CHRISMAN: Oh. How much 11 excursion, do you get? 12 MR. GALLANDER: Yeah. From 13 vertical all the way against the well bore 14 side. Was that included? 15 MR. CHRISMAN: I can -- I think I 16 can answer that. 17 MR. GALLANDER: What kind of 18 pressure are we looking at seeing? 19 MR. CHRISMAN: First, what was 20 actually found was that -- at Michoud there 21 was a measurement of the dimples and 22 impressions in the pipe, and that is

Page 138 202-234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. 1 documented in the DNV report. And that the 2 drill pipe was actually about a half-inch from 3 the BOP wall when it got trapped. That's what 4 actually happened. 5 In the finite element modeling, we 6 then attempted to see if we could make the 7 calculations match what we saw in the 8 evidence, and that is the report. I'll refer 9 you to get the details in the report. But 10 that's where we discovered that if the upper 11 pipe ram had been closed, as many had 12 originally assumed, including myself, the 13 drill pipe would not have been where we found 14 it. 15 The finite element modeling 16 predicts the deflection, and it created a 17 match if you assumed that the upper pipe ram 18 was open and the middle one was closed. So 19 the FEFA modeling calculates the deflection, 20 and I refer you to the report to see all of 21 the engineering details. 22 MR. GALLANDER: So all of the --

Page 139 202-234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. 1 what was the pressure of the requirement to 2 get it to move that far? I mean, did we have

3

4 MR. CHRISMAN: The pressure -- oh, 5 I see your question. The pressure requirement

6

7 MR. GALLANDER: Did it ever to get 8 that pressure -- 9 MR. CHRISMAN: -- to start 10 buckling, it's documented in the report, is -- 11 in the Macondo case it was about -- to buckle, 12 it was about 7,000 psi in the drill pipe, and 13 1,500 psi outside. And that's in the report 14 in one of the tables. 15 MR. GALLANDER: Okay. 16 MR. CHRISMAN: If I misquote by 500 17 off, the report is right. 18 MR. LOEB: (Inaudible) I think 19 that's more than twice what anyone else got, 20 so I'm not really sure if this -- this is a 21 public comment session. 22 MR. GALLANDER: Okay.

Page 140 202-234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. 1 MR. LOEB: And, you know, we have 2 allowed you to ask questions of the staff, 3 which is a bit unusual. 4 MR. GALLANDER: That was good. No, 5 no, no. I thought it was good. It was great 6 to be able to have this discussion. 7 MR. LOEB: Okay. Then, I hope that 8 -- that at least satisfied you for now. 9 MR. GALLANDER: Thanks. 10 DR. MULCAHY: But please come talk 11 to us afterwards. 12 MR. LOEB: Thank you very much. 13 Our last speaker is one of our 14 staff members, Hillary Cohen, our Director of 15 the Public Affairs Department. And she wishes 16 to put in the record two statements, one from 17 Senator Edward Markey of Massachusetts, and 18 Congressman Henry Waxman of California. 19 So please go ahead, Ms. Cohen. 20 MS. COHEN: Okay. I'll be reading 21 Senator Markey's statement first. 22 "Blowup preventers should be fail-

Page 141 202-234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. 1 safe, not destined to fail. This report is 2 another data point in a long history of 3 drilling safety failures that were discovered 4 following BP's oil spill. The report further 5 highlights that other blowout preventers 6 currently being used by the oil industry in 7 offshore drilling could have the same types of 8 deficiencies that led to the BP spill. 9 "If the oil industry ignores or 10 dismisses this report, they will be ignoring 11 these potential ticking time bombs and the 12 safety reforms that could prevent another 13 tragic incident. We need stronger safety 14 standards that build on the improvements 15 already undertaken by the Obama 16 administration, and we need an oil industry 17 that is willing to reform their ways before 18 history repeats itself." 19 And this is from Representative 20 Waxman. 21 "I applaud the Chemical Safety 22 Board's exhaustive technical review of how the

Page 142 202-234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. 1 Deepwater Horizon blowout preventer failed to 2 stop the tragic chain of events that killed 11 3 workers and caused untold environmental harm 4 in the Gulf of Mexico. 5 "The CSB investigation uncovered 6 new evidence showing that buckling of the 7 drill pipe rendered the blowout preventer 8 inoperable just minutes into the accident -- 9 a finding that has safety implications for the 10 proper functioning of blowout preventers still 11 in use around the world. I urge regulators 12 and the oil industry to review the CSB's 13 investigative findings and take appropriate 14 action to ensure the safety of offshore oil 15 and gas development." 16 MR. LOEB: Thank you, Ms. Cohen. 17 I might add both statements were in under 18 three minutes, so that's much appreciated. 19 With that, I turn it back to the 20 Chairman. 21 CHAIRPERSON MOURE-ERASO: Okay. 22 The next issue on the agenda is to take a

Page 143 202-234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. 1 Board vote on the report. And I am going to 2 ask -- I am going to make a motion that is as 3 follows. I move that the Chemical Safety 4 Board approve Investigation Report Number 210- 5 I05, Volumes 1 and 2, entitled Explosion and 6 Fire at the Macondo Well at the Deepwater 7 Horizon rig in the Mississippi Canyon of the 8 Gulf of Mexico that occurred on April 2010, 9 including our findings, recommendations, and 10 associated products, like videos contained in 11 the June 5, 2014, report. 12 Is there a second for this motion? 13 MR. GRIFFON: I second the motion, 14 Mr. Chairman. I also would like to make a 15 comment before we go to vote. 16 CHAIRPERSON MOURE-ERASO: Okay. 17 Yeah. We are open for discussion. So, Mr. 18 Griffon. 19 MR. GRIFFON: Okay. And I just 20 want to say I plan on voting for the report, 21 because I see the primary recommendation to 22 BSEE as enhancing the SEMS system. I do,

Page 144 202-234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. 1 however, urge the team in finalizing the 2 regulatory analysis in Volume 3 of our report 3 to examine how the differences in regulatory 4 approaches affect performance and practices on 5 offshore facilities around the world. 6 I urge them to look beyond the 7 regulatory language to actual implementation 8 experience. 9 I also share some of the concerns 10 expressed by the public in our public comment 11 session about the CSB addressing other non- 12 technical causes of the incident. Obviously, 13 we had to make a decision of how to release 14 the report, but I certainly agree that we need 15 to finalize Volume 4, which is where I think 16 we will address many of these factors as soon 17 as possible. 18 And that's all I have. Thank you, 19 Mr. Chairman. 20 CHAIRPERSON MOURE-ERASO: Thank 21 you. So I call the question. 22 PARTICIPANT: Okay. I will ask --

Page 145 202-234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. 1 I will record the vote, then. Mr. Griffon? 2 MR. GRIFFON: Yes. 3 PARTICIPANT: Okay. Thank you. 4 Mr. Chairman? 5 CHAIRPERSON MOURE-ERASO: Yes. 6 PARTICIPANT: In that case, the 7 report has -- and the motion has passed 8 unanimously. 9 Thank you. 10 CHAIRPERSON MOURE-ERASO: Thank you 11 very much. 12 In closing, I would like to say 13 that the report that we have just voted to 14 approve is comprehensive and far-reaching. I 15 believe it's a road map to vastly improve 16 safety in the U.S. offshore drilling industry. 17 The report makes a number of 18 recommendations to the U.S. Department of 19 Interior and to BSEE, and our findings raise 20 several functionality issues related to the 21 blowout preventer. Likewise, the CSB is 22 making a recommendation to the American

Page 146 202-234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. 1 Petroleum Institute to create and publish 2 guidance for industry to establish an 3 effective management system for safety 4 critical elements. 5 Drilling continues to extend to new 6 depths, and we will operate in increasingly 7 challenging environments. The CSB report and 8 its key findings and recommendations are 9 intended to put the United States in a leading 10 role for improving well-controlled procedures 11 and practices. 12 To maintain a leadership position, 13 the U.S. should adopt rigorous management 14 methods that go beyond current industry good 15 practices. 16 Thank you for attending this CSB 17 public meeting, and this meeting is adjourned. 18 (Whereupon, the above-entitled 19 matter went off the record.) 20

21

22

202-234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. 202-234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. Page 147 A A-R-N-O-L-D 109:1 Aaron 4:15 abandoning 34:10 abandonment 35:10 abbreviated 103:20 ability 47:7 able 37:21 38:19 42:15 43:18,19 47:15 51:10,12 57:7,10 67:12 92:6 110:2 140:6 above-entitled 146:18 absence 72:2 126:11 academics 9:10 accept 3:20 124:7 124:11 acceptable 76:15 76:15 91:9 96:22 104:7 accepted 52:6 84:6 access 16:7 41:5 accident 7:21 9:15 20:11,17 26:11 27:1,18 29:12 55:5,8 56:20 57:21 68:14 77:11 80:6,16 89:12 108:14 142:8 accidents 3:16 4:3 52:18,19 56:14 73:12 75:18 78:4 81:1 88:7 90:5 120:22 accomplished 70:22 account 53:1 achieve 54:10 136:10 acknowledge 97:13 acknowledgement 75:12 acknowledges 111:16 act 57:20 118:17 action 53:8 54:12 54:17 76:16 79:14 91:7 142:14 actions 112:5 activate 25:4 26:2 39:1 51:12 53:9 55:12 activated 22:22 24:22 25:16 30:12 32:12 38:3 50:9 activating 30:7 42:20 active 61:12,13 78:15 81:10 107:6 107:14 actively 53:9 54:11 54:17 activities 12:20 57:21 58:1 61:16 62:14,22 63:7 74:7 79:11 81:16 88:16 activity 73:14 79:8 90:8,17 91:14 activity-based 71:8 90:3 91:11 actor 88:13 actual 12:20 99:5 111:3 130:9 144:7 actuated 30:6 actuating 51:5 actuation 51:17 Adam 4:19 add 11:6 85:21 89:7 93:4 142:17 addition 48:5 additional 16:14 33:8 62:18 82:5 89:21 Additionally 71:5 98:9 99:9 107:11 address 10:5 15:19 16:7 40:17 58:20 64:18 79:15 109:8 144:16 addressed 11:3 15:20 17:9 68:15 68:16 102:8,9 110:16 111:19 120:11 addresses 131:10 addressing 91:6 144:11 adequate 10:22 62:12 adequately 110:16 Adjourn 2:21 adjourned 146:17 administration 141:16 adopt 7:17 146:13 adopted 83:18 101:21 109:21 adopting 85:3 adopts 84:19 advanced 32:18 advancements 69:7 advances 92:20 advisor 95:17 115:13 advocacy 109:12 Affairs 140:15 affect 144:4 affiliation 95:3,7 103:17 112:21 125:9 aftermath 69:2 afternoon 3:4 5:4 15:8 128:5 agencies 72:10 102:2 agency 3:15 agenda 5:4,5 82:16 93:12 94:1 142:22 ago 11:15 102:21 agree 11:5 12:4 92:15 97:3 120:7 144:14 ahead 19:15 140:19 air 19:3 albeit 75:14 allotted 110:6 allow 5:3 42:16 70:9 88:12,12 allowed 26:21 27:14 45:4 50:14 140:2 allowing 43:8 allows 88:10 amazed 123:6 ambient 47:5 130:14 amend 74:17 93:2 amendments 92:22 American 80:11 82:2 84:7 95:10 95:19 145:22 AMF 30:11 31:10 31:16 47:19 49:4 60:14 61:6 65:2 131:22 132:2 AMF/Deadman 25:1,7 30:6 31:8 32:12 37:6 38:11 39:19 40:1 41:18 42:5,21 43:12 45:22 46:5 49:5 51:1 63:12 64:13 64:14,18 65:8 67:13 68:7,20 amount 136:11 Anacortes 72:7,7 analogy 46:6 analyses/appendi... 40:22 analysis 12:10,18 16:16,19 17:22 24:11 31:5 37:2 53:16 55:20 56:2 58:18,18 69:15 71:1,4,5,17 73:14 75:5,10 77:16 90:2,7,20 91:4 97:11,19 98:3 105:9,19,19 106:20 108:3 112:4 131:6 135:5 144:2 analyze 105:21 analyzed 15:14 133:18 and/or 52:15 Anderson 4:15 angle 122:7,7 animated 43:3 animation 17:14 18:19,20 19:10 30:4 48:20 annular 22:14,17 23:12,18 24:6 36:14 50:8,15 136:12 137:4 annulus 116:6,9 117:9,10 answer 63:15 137:9 137:16 answers 128:9 anybody 46:7 49:15 91:21 anyway 83:2 116:17 119:8 124:15 API 65:6 73:21 82:4 85:21 95:19 96:3,10 97:7 98:4 98:12 99:7 103:6 API-RP 106:16 apologize 83:4 124:20 133:17 apparent 53:5 appear 28:13 71:20 appears 39:14 appendix 131:6,9 applaud 125:15 141:21 applicable 30:2 75:1 applies 90:13 apply 10:16 appreciate 115:7 appreciated 95:15 142:18 appreciates 95:19 104:1 approach 12:11 55:17,20 70:14,19

202-234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. Page 148 74:20 75:14,17 85:4,11 86:13 87:13 89:18 90:18 91:9 97:14,22 98:8 105:14 107:13 127:4 approaches 7:5 12:19 83:10 98:11 106:6 144:4 appropriate 8:13 71:17 142:13 appropriately 58:3 approval 76:3 approve 143:4 145:14 approved 112:12 approving 5:14 approximately 18:15 19:20 23:2 24:1 36:13,18 50:10 April 4:8 6:5 15:14 18:1,10 19:17 23:3 25:20 28:21 30:7 39:12,17 73:4 96:2 104:5 143:8 apt 54:19 area 8:12 20:6 22:13 28:18 50:16 86:12 120:12 121:1 122:11 areas 49:19 arm 38:19 Arnold 108:21,22 109:1 112:18 114:5 asked 10:2 109:9 asking 133:1,6,6 aspect 37:8 99:17 aspects 3:17,18 14:20 17:19 96:4 105:10 assess 10:17 assessed 135:11 assessment 134:5 134:14 assessments 79:10 assist 79:22 associated 74:6 143:10 Association 84:9 assume 33:5 assumed 133:10 138:12,17 assuming 67:17 assumption 131:3 assumptions 111:10 130:21 assurance 57:22 63:7 78:16 81:9 assuring 57:19 attachment 59:14 attempt 51:13 attempted 138:6 attempts 68:13 attending 146:16 attention 73:3 89:17,17 attest 49:17 audience 8:9 40:21 127:15 audio 1:21 83:2 audit 61:20 101:17 101:17 auditing 107:15,15 auditors 77:20 101:14 105:4 audits 77:17 98:22 104:22 105:3 106:17 108:11 Augment 77:3 augmentation 78:12 August 72:19 74:16 Australia 3:9 9:7 9:13 auto 32:12 38:15 38:20 39:11,13,16 131:21 Auto-Shear 60:14 61:7 automated 22:22 24:22 38:12 automatic 30:5 availability 57:2 78:10 81:6 available 60:18 77:17 aware 36:11 59:10 60:5 B B 67:8,9,11 78:5 81:2 back 5:20 19:11,16 30:3 33:7 34:14 45:12,21 49:12 60:20 66:2 69:1 91:17 121:22 128:3 132:21 142:19 background 115:14 backup 25:21 bad 88:13 barely 47:4 barrels 18:16 29:17 barrier 21:18,20 34:7,17 54:1,6,9 55:3 57:20 105:19 116:9,15,15 118:10,13,17,21 118:22 119:9,13 126:14,18 129:10 barriers 12:7 32:4 33:13,17 35:6 52:11,14 53:2,3,3 53:4,13 54:5,13 78:3 81:1 107:12 117:17,19,21 based 57:12 97:14 104:22 106:6 128:21,22 129:2 basic 59:20 basically 92:1 130:21 basis 56:18 57:19 120:19 136:22 batteries 25:22 26:1,4 27:2 45:1 45:14,16 46:15 123:8 130:22 132:11 135:7 battery 26:8 27:12 40:18 42:4,12,13 46:3 47:4,9,11 51:3,7 67:18,19 122:22 130:9 132:8 beam 82:18 bearing 33:21 began 34:22 35:20 99:15 beginning 51:22 52:20 begins 18:20 begun 35:21 behalf 115:16 believe 10:4 34:20 36:17 39:8 42:12 42:18 47:10 48:22 50:11 51:2,6 90:11 106:22 134:7 145:15 believed 47:18 66:10 110:12,19 111:9 believes 112:11 believing 34:22 bending 24:14 29:1 bends 28:15,16 beneath 20:22 benefit 121:16 benefiting 107:9 benefits 75:13 107:1,6,11 best 11:6 31:2 36:7 52:7 54:1,9 64:17 94:17 95:1 118:20 Beth 1:17 2:13 14:17,17 89:8 131:17 better 114:6 beyond 7:18 11:2 17:22 85:1,8 87:20 98:2 144:6 146:14 big 44:18,19 bigger 120:9 bit 82:22 86:18 115:19 116:12 124:2 140:3 black 44:2 blades 22:19 24:18 30:8 Blair 4:17 blew 23:11 blind 22:20,21 24:17 25:2,18 26:10,12 27:10,16 29:13 30:8,11 37:16,20 38:4,14 39:18 40:2 42:2 42:20 43:11,17 47:16 51:13,15,17 59:21 60:13 64:8 134:11 blocked 121:13 blot 100:18 blow 25:9 119:1 blowout 4:7 6:5,11 8:1 11:3 12:4,7 16:1 17:1 20:14 20:18 21:10,11 22:1,10 23:6 24:14 25:1 27:20 29:9 30:6 33:14 55:10 56:5 82:2,3 82:8 141:5 142:1 142:7,10 145:21 Blowup 140:22 blue 25:12,20 26:6 39:5 41:6,8,9,15 42:7,17,19 51:3 67:8,9,19 board 1:1,10,11,12 1:21 2:15,19 3:5,7 3:9 4:5 5:7,10 6:13 8:21 13:7 15:8 18:9 55:18 76:3,11,14,17,21 82:13,17 83:18,19 83:20 89:22 97:3 112:12 122:5 123:18 124:9

202-234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. Page 149 143:1,4 Board's 95:22 104:3 141:22 Board-approved 110:5 body 84:7 bolstered 16:15 bombs 141:11 boosting 101:1 BOP 6:6 16:12,20 17:21 22:2,3,8 23:13 25:8,17 26:7 31:20 32:1 32:15 35:14 36:2 36:4,21,22 37:3,4 37:9 40:6 50:5 52:1 53:7,8,17,20 54:1,7 55:8,16,22 58:11 59:8,21 62:11 63:9 65:10 66:22 68:19 75:8 75:10 85:22 89:11 97:12,15 98:3 105:10 121:4 126:12 133:18,19 134:2 135:6 138:3 BOP's 58:20 63:11 BOPs 31:4,20 63:3 89:11 105:11 134:7 bore 21:1,7 23:5 33:20,21 35:21 50:12 116:22 118:11,17 137:6 137:13 borrowed 54:8 bottom 34:2,2,17 35:12 47:1 48:5 116:6,10 118:1 Boulder 14:19 bowed 49:14 box 41:22 59:3 BP 10:4,15,22 13:17 14:14 18:12 54:9 102:7 141:8 BP's 10:6,11,13 40:6 141:4 break 93:14 Brian 102:6 bridge 118:13 Brief 93:14 briefly 17:7 43:4 115:22 127:7 bright 127:21 brings 61:8 broader 87:10 broken 11:18 41:13 48:3 brought 37:1 120:6 127:2 BSEE 72:10 74:16 78:20 79:2,9,21 87:2 89:9 92:2,2 93:2 125:21 126:21 143:22 145:19 buckle 24:13 29:2 48:7 139:11 buckled 24:20 27:19 28:5 29:12 29:15 47:21 49:11 49:14 50:5,21 51:16 buckling 24:16 30:14,21 38:6 39:21 49:1,6 110:15 125:18 126:10 139:10 142:6 budget 10:21 budgetary 10:13 build 141:14 bulletin 73:21 74:4 Bureau 77:1 101:20 102:1 Bureau's 102:6 Burkeen 4:15 burned 19:22 burning 6:15 C C 1:16 3:11 78:12 81:9 calculates 138:19 calculations 35:17 47:9,10 138:7 California 72:6,11 140:18 call 8:13,15 59:20 144:21 called 21:17 22:1,9 28:6 30:8 53:21 60:10,12,16 96:12 119:1 Cameron 59:8,16 64:1 65:11 66:21 133:18 Canyon 143:7 capabilities 58:21 92:11 99:21 capability 60:16 101:2 capable 42:19 53:20 59:22 capping 100:19 captures 117:2 car 46:8,9,12,14 careful 21:9 130:3 carefully 15:18 39:22 carry 69:21 carrying 42:20 cartoon 41:22 43:20 case 12:14 15:22 29:11 38:17 45:5 55:8 56:3 66:12 84:20 87:22 99:2 99:3 126:22,22 127:4,16 139:11 145:6 cases 73:10 casing 33:18,19 49:16 60:12,17 116:7,10 117:3,7 119:2,5,8 catastrophic 21:12 24:19 85:16 catastrophically 73:5 caught 66:8 cause 40:1 55:4 89:11 125:18 caused 6:11 24:13 26:8 28:4 37:20 38:3,6 48:6,7 50:12 126:5 142:3 causes 3:18 123:22 126:2 144:12 causing 29:17 cautioned 20:18 CD 19:6,7 cell 6:2 cement 33:18 34:2 34:6,16 35:9,12 116:2,5,6,9,14,16 116:19,21 117:2,8 117:15 118:1,5,8 118:11,14 119:5 119:13 cemented 116:9 cementing 100:18 115:14 center 24:14 27:20 38:7 98:19 101:7 101:13 103:22 137:6 Center's 101:22 centered 37:11,13 37:14 certain 86:11 certainly 15:21 85:18 87:7 111:17 129:8 135:19 144:14 certified 127:9 cetera 84:9 91:1 CFR 77:3 78:12 125:22 chain 142:2 Chair 91:17 Chairman 9:2 11:19 14:6 15:7 82:21 94:13 142:20 143:14 144:19 145:4 Chairperson 1:11 3:3,7 13:6 82:15 86:5 91:18 93:9 93:15 133:3 142:21 143:16 144:20 145:5,10 challenging 7:12 8:7 146:7 change 18:8 32:18 44:19 59:14 69:16 76:19 92:15 105:20 changed 10:16 changes 10:20,21 54:14 69:3,9 75:3 124:12 characteristics 134:22 Charlie 103:16,21 chart 59:13,16 check 41:8,11 62:1 65:8 check-in 8:12 checking 61:21 checks 66:7 chemical 1:1,10,11 1:12,21 3:5,16,18 76:20 83:17 90:14 95:21 104:2 121:21 141:21 143:3 chemistry 14:18 Cheryl 1:16 2:12 14:9,11 15:4 63:1 75:22 86:19 114:1 Chevron 72:5,19 Chief 40:7 choice 134:13 choke 49:11 choose 49:3 134:20 chosen 15:18 Chrisman 14:22 133:21 137:10,15 137:19 139:4,9,16 circulation 121:10 circumstances 10:9 citizen 128:5 City 13:18 14:14 civil 114:1 clarify 86:21

202-234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. Page 150 clarity 133:2 Clark 4:16 clear 106:20 131:7 clearly 43:19,20 56:7 122:17 climbed 24:8 close 12:22 22:16 37:21 38:4 51:13 51:18 60:11 130:10 closed 23:17,18 24:9 27:9,11 36:13 37:17 48:16 71:14 76:15 136:13,13 137:5 138:11,18 closer 47:2,2 closes 25:2 closing 2:21 23:12 25:18 36:16 40:1 54:2 64:8 103:5 108:6 145:12 closure 27:16 38:13 43:11,16 58:6,7 61:8,9 62:9 cloud 72:22 co-chairs 102:19 coast 19:21 Cohen 140:14,19 140:20 142:16 coil 27:6,13,14 51:11 64:5,5 coils 26:15,16,19 27:6,7 43:6,7 51:11 64:6 cold 46:8,10 47:14 colder 51:8 collaborative 101:4 collar 119:1 collected 40:4 136:21 collectively 52:16 color 59:14 Colorado 13:15 14:19 come 19:10 34:13 52:21 72:4 86:2 95:4 113:13 128:19 140:10 comes 129:10 coming 13:19 15:9 39:2,7 41:20 113:14 124:5 command 27:5 45:18 47:15 commands 51:10 commencement 79:7 commend 109:18 commended 69:6 comment 2:17 5:13 8:10 75:9 113:1,2 118:18 119:19 123:15 127:15,16 139:21 143:15 144:10 comments 8:18 11:13,17 93:12 94:2,3,12 95:20 97:4,6,10 98:10 98:12 104:2 105:8 108:19 109:8 110:8,17 111:6,14 111:17 123:20 124:9,10 Commission 40:8 100:11 101:12 102:7,20 Commission's 104:15 commitment 104:12 committed 96:16 98:13 104:17 common 110:11 commonly 99:12 commonplace 7:8 communicated 74:14 101:19 communication 39:4 41:20 communications 25:5 39:2 65:16 66:1,11 companies 31:3,9 57:13 58:8 70:10 71:15 73:13 83:9 83:15 85:1 86:11 96:4,8 101:4 109:17,22,22 company 56:10 79:4 84:3,4 88:12 115:18 compare 98:10 110:18 compared 83:12 comparing 12:11 88:18 competence 79:3 competent 62:21 77:20 117:8 complete 40:15 completed 16:6 36:21 40:10 46:1 58:19 61:14 63:1 71:14 completely 37:19 45:17 83:10 completing 109:18 completion 76:8,12 112:6 completions 101:9 115:12 complex 22:3 compliance 57:18 70:11 71:20 79:17 84:20 85:3 compliment 120:4 complying 58:3 components 31:12 31:13,14 63:12 70:13 composite 118:16 comprehensive 70:2 100:3 109:19 145:14 compression 28:7,8 28:12 30:17 48:19 49:2,20 50:21 136:3,5,8,11 comprised 25:14 compromised 51:7 computer 25:14 27:3,4 67:8,8,9,10 67:11 computers 26:2 41:9 conceivably 68:19 concept 7:2,3 concepts 7:1 99:10 106:22 concern 49:18 concerns 10:13 144:9 concert 26:16 128:3 conclude 30:4,13 concluded 15:17 24:11 30:10 concludes 75:16 82:11 conclusions 15:10 30:20 97:17 98:2 condition 42:4,6 conditions 29:5 38:1,22 39:8,10 41:18 50:19 51:1 71:19 condolences 9:4 conduct 9:22 10:3 67:4 71:16 78:15 92:6 conducted 16:14 57:22 58:1 62:14 63:8 66:7 73:13 120:19 conducting 71:1 75:4 confidence 68:4 confirms 62:19 congressional 102:5 Congressman 10:2 11:5 140:18 connected 19:2 22:8 connection 9:2 consequences 10:17 85:18 consider 10:9 38:1 41:5 46:18 47:4 47:18 49:17 61:5 67:3 111:12 considerably 84:3 considered 39:20 48:1 considering 48:22 86:3 construction 74:2,7 consultant 15:1 contain 21:3 117:7 contained 25:21 143:10 container 117:1 containing 72:20 containment 101:2 101:4,5 contaminated 117:2,4,4 contention 110:21 CONTENTS 2:1 context 118:3 continental 7:9 continually 58:9 continue 19:15 93:16 103:12 108:15 continued 23:15,21 24:9 51:20 97:2 104:9 continues 7:10 104:12 146:5 continuous 78:15 79:19 81:10,22 104:18 107:22 continuously 7:3 61:16 107:9 contract 18:12 135:7 contracted 37:2 contractor 63:18 70:7 74:2 77:6,22 contractors 10:16 11:1 78:14 96:19 contribute 55:4

202-234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. Page 151 contributed 20:11 contribution 108:2 control 25:8,21 49:21 65:3 90:5 90:15 100:7 105:11 controlled 25:17 26:14 73:11 controlling 22:5 controls 7:2 17:5 convened 100:4 conversations 62:6 134:10 cooperation 100:2 copies 4:10 5:4 core 96:20 corporate 10:11 correct 117:15 126:3 127:4 131:3 corrective 79:14 correlate 38:5 47:20 COS 104:1,10,20 105:5 106:10,12 106:16 108:8 cost 10:12 Counsel 1:16 3:12 40:7 94:11 countries 92:8 couple 33:7 83:6 124:6 course 41:14 covered 33:8 83:3 86:20 87:12 create 146:1 created 100:17 101:8 138:16 creating 20:21 21:18 88:22 crew 21:15,21 22:15 23:11,17 29:6 31:1 34:20 35:5 36:7,11 50:9 53:22 61:3 63:17 67:22 68:9 crews 34:1,9 criteria 79:2 90:7 critical 12:2 17:1 18:3,6,14 21:22 29:22 32:4,19 40:11,12 52:11 54:22 55:1,16,21 56:10,13,19 57:1 57:17,20 58:2,9 58:17 61:2,11,18 62:15,19 70:3,11 70:15,17,20 71:3 71:18,19 74:21 75:17 77:7,15 78:1,8,16,17,21 80:4,14,19 81:3,5 81:11,12,17,21 83:11 87:6,20 88:1,2,4,6 89:3,20 92:4 93:5 114:11 125:20 126:4,7,9 126:19 127:2 146:4 crude 21:4 CSB 3:5,11,14 4:4 4:11 6:21 7:12,20 8:21 9:22 10:3 13:12,15,16,19 14:11,13 15:1,17 15:18 16:14 17:10 20:8,12,17 24:11 28:3 29:3,8 32:4 32:13 35:17 49:7 71:21 72:4 73:16 75:16 76:1,6,8 84:21 94:11 96:1 96:12,13 97:11 98:8 99:1,2,10,15 104:5 105:9 106:12,18 108:2 109:9,18 110:13 111:11 113:17 142:5 144:11 145:21 146:7,16 CSB's 2:8 9:7 10:4 12:9 17:13 142:12 culture 10:6,12 101:11,16 103:3 104:16 107:20 120:10 curiosity 86:9,15 curious 121:3 current 7:18 43:6 63:3 68:19 92:5 146:14 currently 12:12 20:19 82:9 107:2 141:6 Curtis 4:16 curved 28:17 cut 22:20 27:17,21 65:6,16,18,22 66:3 cuts 25:2 cutting 10:13 67:4 cycle 32:22 55:17 55:19 58:12 70:14 70:18 74:20 75:5 75:10,13 81:13 cycles 78:18 D D 81:14 daily 59:1 Dale 4:15 damage 122:10 dangerous 21:8 Daniel 94:14 Darryl 115:4,9 data 16:7 40:4 105:2 136:20 141:2 database 56:11 Davidson 125:5,11 125:12 127:13 day 35:16 42:21 45:7 46:8,10,13 47:11 58:14 days 6:16,18 11:13 11:17 19:22 29:16 30:12 Deadman 38:21 51:5 65:17 66:2,4 66:9,15 67:6 Deadman/Auto 132:2 deal 124:6 dealing 100:18 110:9 deaths 6:13 18:14 deciding 91:6 decision 144:13 decisions 10:14 dedicated 4:11 101:10 102:15 deep 21:1 100:13 deepest 126:14,18 deepwater 6:6,12 10:10,19 13:1 16:12 17:16 18:10 19:19 20:4,14 23:7,22 24:3 29:11 31:19 36:22 40:5 58:19 59:2,4 63:8 64:15 67:14 68:18 75:2 102:7 113:4,10 136:21 142:1 143:6 defense 115:21 116:2 deficiencies 18:2 31:19 87:14 141:8 define 57:16 defined 78:6 79:9 defines 116:5 defining 56:16 definitely 92:19 definitions 55:1 60:21 deflection 136:17 138:16,19 degrees 46:21 47:3 47:6,8 73:7 123:10 128:14 129:9 130:10,22 131:4,5 delay 83:1 deliver 107:20 demand 57:5 demonstrate 18:22 81:16 demonstrated 99:3 demonstrates 75:11 dense 21:17 Denver 13:14 Department 72:12 77:3 92:1 100:9 140:15 145:18 dependent 40:4 79:2 depending 117:11 depends 17:5 21:22 54:14 120:16 depicted 37:14 48:8 depicts 17:3 30:4 70:16 deployed 16:13 101:5 depth 120:21 126:13 depths 7:11 146:6 describe 7:21 8:2 56:22 57:2,4 87:1 98:5 106:12 described 15:13 52:9,13 99:7 describing 78:7 description 52:5 design 3:19 10:14 49:16 53:15 58:20 100:18 117:3 132:11 134:4 designate 56:9 designed 4:2 22:10 22:20 25:3 26:16 37:10 43:5 67:6,7 116:1 117:8 127:10 designs 29:9 49:16 Despite 97:15 destined 141:1 destruction 28:2 detail 16:17 30:18 33:3,10 44:6 97:16 detailed 40:21 details 16:8 17:14 33:8 41:3 73:17 106:3 138:9,21

202-234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. Page 152 detected 42:6 66:20 determination 125:17 determine 57:15 134:15 determining 125:19 devastating 20:17 develop 69:13 developed 17:14 60:8 62:8 69:5 73:20 98:16 100:11 development 15:21 80:18 81:4,19 102:11 142:15 device 17:1 18:3 22:4 devices 22:17,18 Dewey 4:18 diagram 65:15 diameter 22:9 died 19:18 45:17 47:13 difference 24:12 28:19 130:11 differences 88:21 144:3 different 12:19 33:13 47:22 83:10 90:9 127:5 132:1 132:6 differential 29:5 136:11 differs 65:9 difficult 82:22 124:12 difficulty 67:1 digital 41:9 dimples 137:21 direct 91:21 direction 117:11 directly 50:4 56:12 97:21 106:5 Director 1:15 13:12,14 94:15 102:6 103:22 140:14 disappointed 11:9 disapproving 5:14 disassembled 43:18 disaster 22:6 disasters 29:18 disclaimer 115:15 disconnected 41:14 discover 62:6 discovered 40:14 138:10 141:3 discrepancies 83:13 discuss 9:7 18:1 33:2 39:20 discussed 11:8,21 16:16 30:17 70:21 discussing 9:9 12:9 128:19 discussion 12:6 17:8 18:4 106:8 115:20 136:4 140:6 143:17 discussions 136:2 dismisses 141:10 displacing 35:1 distinct 88:20 89:5 116:17 distinctions 117:22 disturbed 6:3 divert 36:8 diverter 89:16 Division 72:11 DMAS 132:3 DNV 37:1 138:1 DNV's 40:8 document 71:3 74:5 documentation 63:11 64:1 documented 32:5 37:9 56:7 78:5,20 138:1 139:10 documenting 75:5 documents 63:16 98:5 106:11,16 doing 42:10 87:2 93:10 94:7 120:14 123:16,20 134:5 Don 2:11 75:19 83:17 Donald 1:15 4:15 13:12,13 donut-shaped 22:16 Dr 33:2,4 89:7 119:22 120:2 121:18 128:17,22 129:8,12 130:2,6 130:19 131:2,10 131:15,17 132:15 132:19 133:15 134:1 135:17,19 136:14,18 137:8 140:10 draft 2:8 5:14 76:2 76:22 109:11 110:2 drain 26:8 42:11 47:10 drained 42:14 45:17 47:12,13,14 51:4 draw 98:1 drawbacks 52:19 Drawing 100:15 drawings 41:12 draws 97:16 drifts 38:16 drill 22:13,20 24:7 24:8,13,17,19 25:3 27:17,19 28:5,11 29:12,15 30:14,21 31:1 32:6 37:11,17 38:7 48:2,6,12,14 48:17 49:21 50:5 50:13,15 51:16,18 59:3,5,15 60:1,6 110:15 119:7 125:13 126:13,15 136:19,20 138:2 138:13 139:12 142:7 drilled 21:2 33:22 drillers 21:16 drilling 6:7 7:10 15:2 18:11 19:20 20:5,20,21 21:13 21:15,17,21 22:12 23:9 28:9 29:6 30:1 32:7 33:13 34:1,12,20 35:1,4 35:5,5 50:3 53:21 59:1 60:7 61:3 64:15 70:7 74:1 75:1 77:6,22 79:8 82:4 89:13 100:5 101:9 102:21 109:22 115:12,13 118:18 141:3,7 145:16 146:5 drive 79:19 81:22 133:11 drives 76:19 driving 7:3 drop 50:15 dropped 24:5 due 3:20 10:9 51:2 dumbfounding 123:11 Dupont 112:22 duration 57:3 E E 81:19 E&P 115:10 e.g 77:19 earlier 19:8 70:21 early 113:12 easies 128:12 easiest 125:12 easily 50:2 edit 59:16 edition 64:21 82:5 EDS 60:10 61:5 education 116:12 educational 122:21 Edward 140:17 effect 18:22 41:17 effective 12:1 28:7 28:7,12 29:10 30:17 32:2 48:19 49:2,20 50:21 69:21 77:10 78:3 80:3,13,22 81:21 106:1,21 108:5 146:3 effectively 32:21 62:20 77:7 93:7 effectiveness 108:11 effects 55:7 efforts 8:5 36:20 69:7 96:11 107:21 EHBU 132:4 either 16:5 41:12 63:17 67:7 117:10 118:13 electric 25:4 electrical 24:21 25:18 26:15 39:2 41:19 65:7 66:17 67:5 electrically 22:3 electronics 129:6 130:7 element 55:2,16 56:10,13,19 57:1 57:20 58:2,5 61:11 71:6 78:9 80:19 81:5,17 87:6 90:6 93:5 102:12 125:20 126:5,7,9,19 127:2 138:5,15 element's 78:18 81:12 elements 12:2 17:4 18:6 32:20 52:15 54:22 55:22 57:17 58:10,17 61:2,18 62:16,20 69:15 70:3,5,11,15,17 70:20 71:3,18,19 75:17 77:8,15 78:2,17,22 80:4 80:14 81:3,11,22 83:11 87:20 88:1

202-234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. Page 153 88:5 89:3,20 92:4 93:7 146:4 eliminating 71:10 email 59:11 emerge 16:8 emerged 110:11 emergency 5:18,21 20:15 22:6,22 25:3,11,22 29:10 30:5 31:8,12 32:11 55:11,12 employed 58:8 employee 59:12 employees 59:10 enabling 104:20 encapsulate 58:7 enclosed 25:14 encourage 126:20 endangering 21:15 ends 29:20 energize 27:5 energized 27:7 energy 42:16 102:13 Enforcement 77:2 101:21 engaging 62:6 engine 46:11,11 engineer 125:14 127:10 engineered 17:4 engineering 138:21 engineers 9:10 108:21 109:3,10 109:13 enhance 102:17 enhanced 106:1 107:5 enhancement 104:3,19 108:1 enhancements 106:9 enhancing 143:22 enlarged 54:12,17 ensure 31:15 32:3 32:19 53:16 54:6 58:1 62:12 65:17 78:2 91:1 93:6 101:18 104:11 142:14 ensured 35:14 ensuring 8:3 77:9 104:18 enter 93:11 entered 23:4 35:22 entire 9:20 97:13 97:18 105:12 entities 77:19 entitled 143:5 entrance 5:5 8:12 environment 46:16 96:18 130:9 134:21 environmental 29:18 69:11,13 77:2 99:6 101:21 122:10 142:3 environments 7:12 146:7 EPI-53 64:21 equal 135:15 equipment 3:19 9:16 10:19 17:4 20:13 21:22 34:11 44:15 45:9,10 48:11,15 52:22 53:7 55:2 62:15 65:1 66:12 74:21 75:6,15 82:3 87:9 88:2 93:20 100:6 100:19 105:17 106:4 114:11 121:5 erroneously 34:19 error 52:17 errors 56:8 escaped 6:15 24:4 especially 85:15 125:9 Espinosa 113:4,8 114:4,15 essential 22:5 69:14 97:2,14 104:9 105:15 essentially 24:13 118:15 establish 70:1 80:22 82:5 90:22 146:2 established 39:10 50:20,22 74:9 104:11 establishing 41:17 69:20 establishment 69:10 78:2 81:9 101:3 et 84:9 91:1 European 98:11 110:18 evaluate 92:7 evaluating 132:9 evaluation 76:16 83:20 110:20 evening 35:18 77:1 95:11,16 103:21 event 6:22 32:11 55:5,8 56:20 57:21 68:14 89:12 101:6 123:21 events 10:10 15:14 17:15 18:1 35:16 56:3,6 123:4 142:2 eventually 19:22 23:5 24:18 29:1 29:17 37:20 everybody 40:20 41:5 67:2 evidence 12:16 26:5 37:7,12,22 39:12 48:21 83:7 113:22 114:2 120:5 128:18 138:8 142:6 evident 98:15 examine 3:17 20:9 39:22 84:13,14 93:22 123:22 124:9 144:3 examined 6:21 16:1 99:17 example 58:11,13 70:17 90:1,10 134:4 examples 54:4 93:19 110:20 111:6 excerpt 59:11 excessive 136:3,5,8 exchanger 73:5 excludes 75:7 excursion 137:6,11 excuse 16:9 89:2 129:16,18 Executive 103:22 112:2 exhaustive 141:22 exist 107:2 existed 16:11 existing 29:9 74:17 100:16 exit 5:22 exited 36:10 exits 5:18,18,19,20 5:21 expand 83:5 expanded 52:12 expect 135:4 expected 117:6 experience 13:21 15:2 46:9 120:17 129:3 144:8 experienced 18:12 experiences 28:22 expert 11:12,16 12:5,15 52:8 87:8 experts 52:4 100:11 110:3 explain 20:16 87:11 explaining 110:13 explanation 106:20 explicit 89:5 explicitly 70:16 75:8 exploration 80:12 96:6 100:14 explosion 4:13 10:11 13:18 14:15 17:16 19:19 21:14 24:20 28:6 50:22 143:5 explosions 6:11 18:12 24:3 36:19 39:9 express 9:3 expressed 144:10 extend 7:10 146:5 extended 32:6 extension 94:6 extensive 12:6 13:21 24:11 external 65:1 77:19 eye 28:16 F facets 100:5 facilities 3:16 12:21 72:5 75:1 90:14 144:5 facility 34:13 37:1 46:19 79:4 fact 28:14 34:21 37:13 46:18 51:18 59:11 84:2 99:12 127:8 128:15 factor 114:10 factors 7:22 17:7 20:10 44:5 54:14 144:16 Fahrenheit 46:22 47:3,6,8 73:7 123:10 130:14 fail 20:19 22:18 31:17 53:11 68:8 140:22 141:1 failed 6:9 20:14 27:3,12 36:14 48:13 111:7 116:15,16 121:5 142:1 failing 9:16 fails 21:20 97:12 122:20 failure 17:22 26:21

202-234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. Page 154 27:22 32:10 55:4 98:3 117:14 122:22 failures 9:17 16:11 16:21 31:6,11 33:3 68:18 117:16 141:3 fair 94:9 false 31:9 familiar 33:6 families 103:10 108:13 family 9:4 far 136:17 139:2 far-reaching 145:14 fatally 73:9 federal 3:15 100:2 102:3 feedback 107:7 110:11 feel 68:14 93:3 107:21 108:1 111:20 129:19 feet 20:5 123:9 FEFA 138:19 felt 47:6 Fett 115:4,5,9 119:17 field 26:17 43:7 106:7 107:10 110:3 Fifteen 73:2 file 19:7 final 11:4,14 16:6 43:12 62:17 109:6 109:7 111:13 119:2,8 125:22 finalize 144:15 finalizing 144:1 finally 34:5 36:1 53:21 58:6 find 19:10 21:13 123:10,14,22 124:1 134:9 136:1 finding 29:3 142:9 findings 7:13 15:10 16:15 17:20 20:12 20:16 29:22 30:13 30:19 33:10 41:2 72:3 79:16 86:1 98:3 123:2 142:13 143:9 145:19 146:8 fine 131:14 finite 138:5,15 fire 4:13 6:12 13:18 17:15 18:13 21:14 30:11 41:19 65:18 65:20 66:2 72:6 84:8 89:15 143:6 fired 66:15 fires 66:4 first 4:6 5:6 8:15 9:3 11:8 14:9 24:3 30:3,3 33:18 38:2,9 39:1 55:2 55:19 60:12 63:10 65:14,16 66:14 70:22 76:4,22 95:9 96:1 100:22 104:4 110:12 115:8 116:1,13 128:12 137:19 140:21 fits 134:16 135:1,2 135:9 five 18:16 29:16 fix 23:20 fixed 3:16 flammable 21:10 22:11 23:14 24:1 72:20 73:6 float 121:4 floor 8:16 20:3 21:1 22:1 26:7 36:10 84:14 130:16 flow 6:8 21:6 23:15 23:22 24:10 35:20 36:21 43:9 48:2 51:19 116:21 117:7,9,12 119:6 flowchart 50:6 flowed 29:14 flowing 43:10 54:2 fluid 42:8 43:9,10 fluids 21:7 72:21 115:14 focus 11:22 43:1 74:22 84:4 97:15 105:16 107:7 114:9 115:19 focused 71:6 97:12 104:13 105:9 121:3,8 focuses 107:17 focusing 69:22 107:12 follow 6:4 83:1 134:18 followed 36:15 50:10 following 5:9 8:1 10:9 77:13 85:6 97:10 105:8 141:4 follows 143:3 footnote 131:11 force 29:1,1 forced 23:10 forces 27:8 48:4,5 100:4 foremost 70:22 forensic 37:2 forgive 94:15 form 22:19 formal 61:19 79:12 formed 102:2 former 102:3 forms 107:1 forth 49:8 forward 12:17 88:21 92:19 107:22 fostering 103:3 found 24:2 32:4,13 34:15 41:10 61:4 66:7 68:18 112:7 137:20 138:13 four 11:15 15:11 44:1 67:12 68:11 79:14 99:14 100:4 102:16,21 111:21 114:6,13 fourth 64:21 framework 52:10 72:16 110:22 frameworks 110:19 Frank 128:4 free 129:19 freezing 47:2 130:10 friends 9:4 front 5:5 93:18 95:5 fulfill 88:14 fulfillment 80:1 81:14 full 12:17 16:7 102:12 110:4 111:5,14,22 131:5 fully 37:21 38:12 51:17 97:7 98:13 99:5 101:10 105:6 107:8 function 47:7 54:7 57:10 68:2 functional 57:9 99:5 functionality 56:22 78:9 81:6 145:20 functioned 126:12 functioning 31:16 32:3 58:2 68:10 142:10 functions 25:17 26:1 fundamental 7:1 further 15:21 16:15 87:2,12 92:22 141:4 Furthermore 74:16 future 4:3 8:4 13:4 97:3 104:10 110:1 117:16 121:16 G Gallander 128:1,4 128:21 129:4,9,14 129:17,22 130:5 130:17,20 131:8 131:13,19 132:17 132:20 133:5 135:12,18,21 136:15 137:2,12 137:17 138:22 139:7,15,22 140:4 140:9 gap 58:6,7 61:8,9 62:9 gaps 70:9 85:5,9 garden 19:1 gas 6:8,17 20:2,22 21:4,11,12,19 22:11 23:4,10,15 23:20 24:4,9 29:14 49:9 50:16 74:18 96:5,15 99:16 102:14,15 142:15 gathered 44:10 general 1:16 3:12 64:12 94:11 97:10 105:8,12 generally 41:2 52:13 69:18 84:5 generated 27:8 generating 26:17 gentlemen 128:8 give 7:21 17:12 31:9 33:7 130:7 given 5:10 33:11 84:17 85:9 89:17 97:5 120:3 122:9 124:13 glad 9:6 11:22 global 83:9,15 109:16 globe 7:7 go 5:3 7:18 17:21 17:22 19:15 36:4 44:6 45:12 60:20 66:2 113:21 117:13 125:1 128:7,11 131:14 131:21 133:8

202-234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. Page 155 136:16,17 140:19 143:15 146:14 goal 80:6,16 90:4,5 90:22 91:14 134:18 goal-based 90:18 91:10,13 goal-setting 90:3,4 goal-setting-based 91:13 goals 62:4 69:20 goes 10:7 74:12 132:21 going 5:6,8 17:12 33:6,9 48:2 56:9 58:11,13 63:5,6 68:22 76:2 85:1,8 86:18 93:12 94:10 95:12 98:1 103:19 107:21 113:3 114:9 119:20 128:1,7 130:7,13 130:18 131:20 132:22 143:1,2 good 3:3 7:19 15:8 42:4 67:18,20 69:4 84:6 92:17 95:11,16 101:16 101:18 103:20 110:13 120:16 121:6 140:4,5 146:14 Gordon 4:16 government 101:15 102:22 103:12 108:16 grade 59:22 great 29:2 92:15 93:4 140:5 greater 8:3 114:12 greatly 27:18 115:7 Griffon 1:12 2:6 3:10 8:21,22 9:1 13:8 15:8 82:17 82:19,20 86:6,7 89:22 91:16,19 143:13,18,19 145:1,2 Griffon's 97:4 group 76:7 104:13 104:14 113:5,10 128:3 133:8 group-think 120:13 guarantees 79:3 guess 86:8 94:19 guidance 32:17 64:17 69:5 73:19 73:22 79:22 92:18 146:2 guide 100:12 guidelines 74:3 101:22 Gulf 4:8 6:9,17 18:13,17 20:6 29:15 83:11,14 142:4 143:8 guys 115:8 H half-inch 138:2 hand 90:16 handle 53:18 handwriting 124:21 happened 25:19 28:21 49:2 50:18 60:4 66:13 92:16 138:4 happening 63:3 123:17 happens 19:4 hardware 16:20 32:1 53:6 harm 52:19 142:3 Haz 91:4,7 hazard 28:9 31:2 52:17 53:16 55:20 56:1 58:18,18 69:15 71:1,4,5,11 71:16 73:14 77:16 90:2,6,8,20 91:4 95:21 105:19 127:1,5 134:5 135:5 hazards 71:8 73:10 90:6,15 HAZID 120:16 HAZIDs 120:15,19 head 16:13 33:15 35:14 126:8 health 14:1 62:1 72:12 96:18 hear 5:6,8 15:9 122:3 125:7 heard 40:12 hearing 113:19 heart 114:4 heat 73:5 130:8,12 heavier 60:6 heaviest 60:1 heavy 29:2 Hello 108:22 help 20:16 33:20 52:11 54:6 helpful 120:6 helping 97:2 104:9 Henry 140:18 Hi 95:11 hierarchy 7:2 high 22:7 32:10 48:2 high-pressure 6:8 higher 99:4 111:2 highest 59:22 101:8 highlight 75:4 highlighted 59:2 88:3 highlights 54:20 141:5 highly 17:5 40:4 73:6 96:12 Hillary 140:14 hiring 125:15 history 6:20 20:2 29:19 141:2,18 holding 48:11 hole 34:2 holes 54:11,11,16 Holly 95:9,16 Holmstrom 1:15 2:11 13:13,13,15 14:3,5,6 15:7 75:20,22 83:16,17 89:21 honor 113:9 hope 9:2 11:2 12:22 36:7 40:20 62:5 109:20 140:7 Hopefully 117:12 Hopkins 95:10,11 95:17 103:15 Horizon 1:3 6:6,12 10:10,19 13:1 16:12 17:16 18:11 19:19 20:4 23:7 23:22 24:3 29:12 31:20 36:22 40:6 58:19 59:2,5 63:8 67:15 68:19 75:2 102:7 113:4,10 136:21 142:1 143:7 Horizon's 20:14 Horowitz 94:14 hours 113:12 Houston 114:17 human 17:6 56:7,8 114:9 hydraulic 24:21 25:4 39:6 42:8 43:9,10 65:3,18 66:3,14,18 67:4 hydraulically 22:4 hydraulics 65:7 hydrocarbon 33:20 72:21 hydrocarbon-be... 34:3 118:2 hydrocarbons 24:2 34:14 35:8,20,22 36:3 117:10 119:7 hydrogen 73:6 I I05 143:5 idea 55:15 67:22 68:9 ideas 106:22 identical 25:14 identification 12:1 70:19 77:14 80:3 80:13 81:3 110:22 identified 16:2 28:4 28:10 31:19 40:19 53:16 66:6 71:8 74:7,9,13 78:16 78:21 80:8,9 81:11 84:17 identify 38:3 52:1 55:21 56:2 58:16 70:1 71:2,17 84:5 85:12 99:18 identifying 78:1 125:19 ignited 72:22 ignition 21:13 24:2 ignores 141:9 ignoring 141:10 II 92:21 106:15 133:21 134:1 illustrate 31:6 image 37:10,15 38:17 41:21 48:8 48:9 59:1 imagine 86:10 immediate 17:15 immediately 99:22 impact 27:18 31:2 61:18 96:17 114:12 imperative 16:10 96:20 implement 92:11 96:13 implementation 74:6 80:19 97:21 106:5 144:7 implemented 69:4 89:9 101:1 107:5 implementing 85:7 103:2 implications 142:9 implied 135:15 implies 135:15 importance 75:4 107:18

202-234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. Page 156 important 9:21 17:2 25:17 29:3 37:8 38:1 44:6,22 54:20 56:12 76:20 93:7 102:12 108:2 111:10 114:7 121:1 123:5 importantly 38:5 impossible 26:9 64:6 impression 133:16 impressions 137:22 improve 58:10 69:7 103:1,7,13 108:8 108:16 145:15 improvement 79:20 81:22 85:10 85:15 104:12 improvements 69:6 77:14 84:4 92:4 92:12 99:19 141:14 improving 7:15 61:12 146:10 in-depth 87:19 in-house 135:9 in-person 124:19 inability 32:5 inaction 54:12,18 inadequate 16:22 32:13,15 68:1 71:16 88:17 97:5 112:5 inappropriate 122:16 Inaudible 115:1 125:5 139:18 incapable 45:18 51:5 incentive 108:8 incidence 105:2 120:22 incident 9:10 14:2 15:12 17:13 30:16 33:6 34:9 35:3 42:13,22 45:3,7 47:12 49:22 51:4 58:14 64:14 72:4 73:3,16 84:16,22 85:8,12,16 96:2 96:22 97:1 99:15 102:14 103:5,6,11 104:6,7,8 108:6,7 109:20 141:13 144:12 incidents 91:1 97:3 104:10 122:5 include 56:7 61:1 78:13 93:5 111:6 included 12:6 99:11 111:14 137:14 includes 12:10 80:20 98:21 105:2 including 3:18 9:12 10:20 12:18 13:17 14:14 69:15 77:5 78:9,14 80:7,17 81:6 96:5 100:17 102:10 138:12 143:9 incomplete 112:4 incorporates 69:14 incorrect 111:11 increase 25:10 50:13 62:1 increasingly 7:11 146:6 independence 79:3 independent 3:14 62:21 77:19 78:20 79:6,11 81:14 101:14 105:3 110:8 116:8 independently 25:13 indicated 37:12 65:14 66:21 indicates 26:5 indicator 79:19 indicators 81:20 105:1 indiscernible 3:20 individual 44:8 82:7 109:13,17 111:4 135:10 individually 52:16 individuals 4:22 110:9 Industries 72:13 industry 3:21 7:19 9:20 13:3,21 21:8 30:2,20 31:7 32:16 49:9 57:13 64:17 67:3 69:4 89:13 95:18 96:5 96:9,15,21 97:1 98:6,13,16 99:16 100:1,4,11 101:16 101:19 102:15,22 103:4,7,8 104:8 104:11,17,20 106:9,10,13 108:8 115:11 122:15 123:19 141:6,9,16 142:12 145:16 146:2,14 industry-recom... 68:20 ineffectively 70:10 inexorably 23:22 informal 61:19 information 5:16 40:11 44:10 45:13 50:7 73:22 ingress 34:4 35:7 initial 9:8 17:19 39:9 111:18 initiate 27:5 initiated 27:15 initiatives 98:18 102:9 injured 19:18 73:9 85:19 injuries 6:14 18:15 inoperable 27:13 45:6 142:8 inquiries 61:20 inquiry 113:12 inside 24:14 27:20 28:20 41:9 50:13 117:7 118:10 119:5 128:15 129:5 130:22 131:4 136:16 inspection 32:15 53:18 inspections 77:18 install 34:2 installed 35:11 installing 34:5 instance 123:6 Institute 80:11 82:2 84:8 95:10 95:19 146:1 instructed 64:3 instrumentation 50:4 integral 123:2 integrated 82:9 integrating 7:1 integrity 35:13 48:4 62:11 69:16 intended 6:7 7:14 23:14 55:9,11 56:14 91:12 119:6 146:9 intent 34:12 interaction 107:19 interactions 57:8 61:1 78:11 81:7 123:1 interest 37:3 95:12 interested 131:12 interesting 11:12 64:11 122:3,17 134:9 interface 74:5 Interior 77:3 92:2 100:10 145:19 internal 11:9 107:15 international 84:10 85:22 121:21 internationally 57:12 interrelated 111:21 112:9 interrelations 124:14 interrogation 129:20 133:1 intervention 99:20 introduce 13:10 14:3,7,9 17:17 115:9 introduced 48:20 introducing 3:12 13:11 investigate 88:14 investigates 3:15 investigating 84:22 85:13 investigation 4:6 9:8 10:1,3,8 11:4 13:10 14:2,11,21 17:11 20:9,12 28:3 76:5 78:7 84:18 87:17 92:7 95:22 99:15 104:3 142:5 143:4 investigations 3:17 13:17 14:13 71:22 72:4 73:16 84:21 investigative 3:13 4:5 5:9,12 8:5 14:4,8 16:18 31:5 82:19 91:22 142:13 Investigator 1:16 1:17 investigator's 8:10 investigators 7:20 29:4 122:4 invisible 28:15 involved 9:19 14:12 96:4 129:7 involves 20:20 irregularities 28:15 issue 4:1 76:9,11 114:6 120:9,10 142:22 issued 114:12 issues 11:2 12:18 15:18 40:18 52:3

202-234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. Page 157 87:18 110:14 145:20 item 82:16 93:11 items 111:10,13 J Jacqueline 114:16 Jason 4:15 JAT 40:16 job 110:13 116:2 116:19 118:7,11 119:5 John 121:20 joined 13:15 14:11 joining 3:8 14:22 joint 100:4 Jones 4:16 Jr 4:17 judgment 123:19 juggling 8:8 July 113:20 June 1:7 10:1,1 143:11 justification 87:15 K Karl 4:17 keep 94:3,8 keeps 120:14 Keith 4:17 Kemp 4:17 Ken 114:5 Kenneth 108:20 109:1 key 7:13 17:19 20:13 44:5 79:18 81:20 104:19 118:12 125:20 146:8 kick 21:8,9 22:9 23:3 35:21 36:12 55:10 56:4 kicks 21:16 kill 49:11 121:13 killed 85:19 126:15 142:2 killing 126:11 kind 123:13 137:17 Klepinger 4:17 knocks 132:20 know 39:12 50:8 59:9 60:4 63:16 63:17,20 67:15 68:10 83:15 86:9 86:12,13 89:9,14 90:5 91:3,8 92:13 109:11 113:7,14 113:20 114:4,8,10 115:2 120:13 121:9 122:14 128:15 130:10,20 136:2 140:1 Knowing 32:8 knowledge 104:21 108:10 120:21 knowledge-shari... 109:15 known 20:6 21:7 22:14,17 25:1,9 30:16 73:10 L Labor 72:13 lack 12:16 32:2 63:10 72:17 lacks 69:22 70:6 90:12 ladies 128:8 language 69:22 87:4 88:8,11,18 90:9 91:14 144:7 large 8:7 22:8 24:12 28:19 72:22 73:1 86:10 122:11 130:12 larger 28:22 largest 6:19 20:1 LARP 111:2 last-ditch 27:22 68:13 late 31:18 latent 16:11 18:1 54:11,16 68:18 Laughter 127:20 launched 20:8 100:2 Law 114:17 layer 62:18 layers 21:2,3 laypeople 122:18 lead 14:10 21:9 56:3,5 94:11 112:4 132:22 leadership 7:16 107:18,19 146:12 leading 6:12 7:14 10:10 11:10 17:15 21:14 146:9 leads 21:19 42:18 learned 9:18 15:16 44:10,14,19 45:8 45:9 100:15 102:16 learning 94:18 104:18 105:1 107:6,22 108:9 learnings 11:7 29:22 104:21 109:21 leasee 77:5,22 leave 131:12 leaving 6:16 26:20 34:12 led 7:22 13:16 30:13 34:20 39:21 49:3 141:8 left 3:11 28:1 37:10 38:10 43:15 48:8 51:11 59:3 legitimate 97:19 length 94:3 less-than 88:16 lessons 9:17,18,19 13:1 15:16 100:15 102:16 let's 19:4 67:14 letter 10:2,7 level 70:8 83:9 99:4 101:8 111:2 levels 61:15 127:1,5 lie 87:14 life 32:22 41:15 55:16,19 58:12 70:14,18 74:20 75:5,10,13 78:18 81:12 129:10 light 120:6 lights 127:21 likelihood 32:10 Likewise 145:21 Lillian 113:3 limit 8:18 55:7 limitations 53:15 58:20 limited 80:8,18 86:12 87:9 limits 52:18 line 49:11 54:16 115:21 116:1 121:13 128:8 link 56:12 list 56:11 58:6 77:16 94:5,19 113:3 115:6 117:18 119:21 125:3 listed 53:22 56:16 56:20 59:6 little 52:13 83:1 87:2 124:2 lives 4:12 9:5 21:15 103:11 108:14 load 117:12 119:10 located 19:20 22:1 33:15 73:9 131:1 location 5:17 36:8 locations 5:18 Loeb 1:16 3:11 94:10,12,13 103:15 108:18 112:18 113:2 114:14,21 115:2 119:16,20 121:18 124:17 125:6 127:13 129:16,18 130:1 139:18 140:1,7,12 142:16 long 42:3 113:12 122:11 141:2 longer 28:17,22 51:9 look 12:17 17:19 37:10 39:11,14 40:16 41:21 44:2 85:13 87:18 88:4 89:10 92:8 121:7 135:19 136:4,7 144:6 looked 44:20 45:21 84:10 133:10 136:5 looking 48:21 49:10 55:15 62:10 63:16 87:18 123:21 136:9 137:18 loss 24:20 39:4,6 41:19 42:8 lost 4:12 9:5 25:6 25:19 48:3 66:10 103:10 108:13 121:10 lot 37:3 44:7 87:19 94:4 115:13,20 117:13 120:15 Louisiana 19:21 low 7:4 70:8 74:10 77:11 80:6,17 lowered 26:7 M M 4:18 MacKENZIE 1:16 2:12 14:10 15:5,6 19:5 29:21 51:21 69:1,2 76:1 87:16 92:13 114:3 128:13 131:16 Macondo 1:3 4:7 6:9,16 9:8,19 14:11,20 15:12,15 17:10 18:13 20:7 23:4 32:18 33:6 34:8 64:13,16,19 69:3 76:5 78:7 92:16 96:2 99:14 100:16 102:4,17 104:5 105:18

202-234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. Page 158 132:14,18 139:11 143:6 MAEs 111:1 magnetic 26:17 43:7 main 41:3 maintain 7:16 80:22 146:12 maintaining 31:3 61:9,10 maintenance 32:15 53:19 62:13 78:3 major 3:16 16:4 40:6 55:4,7 56:14 56:20 57:21 68:14 75:18 77:10 78:4 80:6,16 81:1 88:7 89:12 132:6 majority 106:2 making 9:15 36:6 84:4 145:22 Malcolm 119:22 MALE 18:21 19:17 manage 52:11 55:15 70:10 77:7 90:17 92:3 managed 32:21 62:20 71:9,12,12 93:7 99:6 management 3:21 7:18 10:16 11:20 12:1 14:1 16:21 18:2,6 21:9 32:2 32:13 52:2,3,5,9 54:21 61:15 62:5 69:11,13,16 70:2 70:14,18 72:15 75:13 79:12 80:3 80:14,20 81:18,21 86:1 88:16 89:1,3 90:11 93:5 99:7 99:20 101:11,17 102:4 105:20,21 107:2,7 146:3,13 managing 52:7 74:20 83:11 90:8 94:14 107:12 mandated 123:18 manifestations 16:21 32:1 52:2 52:21 manner 88:17 96:17 manslaughter 113:19 manually 22:15,22 50:9 53:9 Manuel 4:18 manufacturer 59:8 64:2 66:22 133:19 manufacturer's 41:12 65:11 manufacturers 132:6,7 134:3 map 145:15 marine 96:7 Mark 1:12 2:6 3:9 8:20 133:21 134:1 marketing 96:7 Markey 140:17 Markey's 140:21 Mary 1:17 2:13 14:16,17 89:8 131:17 masks 31:11 Massachusetts 140:17 massive 28:1 match 38:2 41:11 138:7,17 material 118:16 matter 146:19 Maya 112:22 113:1 mean 30:20 118:3 123:11 139:2 meaning 35:19 means 31:18 34:10 36:6 60:17 68:17 meant 12:9 31:14 31:15 58:7 measure 27:22 measured 136:19 measurement 137:21 measures 69:20 99:18 108:11 mechanical 62:11 69:16 118:13,21 118:22 119:9 mechanism 28:4,6 30:15 38:6,20 76:10,19 medical 73:2 meeting 1:5 3:4 4:4 5:19 11:13 95:7 95:22 104:4 122:18 146:17,17 meetings 9:12 meets 79:2 member 1:12 3:9 8:21 13:7 15:8 89:22 97:4 113:9 members 1:10 14:3 23:11 96:10 110:2 140:14 membership 109:16 men 4:12 mention 58:15 mentioned 17:8 33:12 35:11 40:13 49:20 52:21 99:10 128:13 131:21 mentioning 4:14 met 38:22 metal 22:19 43:6 methodically 99:16 methodologies 81:2 methods 7:18 52:7 57:14 58:8 146:14 Mexico 4:9 6:9 18:14 20:6 29:16 142:4 143:8 Michael 125:11 Michoud 46:19 137:20 microphone 95:4 125:7 middle 138:18 mike 103:18 113:6 miles 19:21 126:17 million 18:16 29:16 mind 47:17 125:21 Minerals 102:3 minimal 84:20 85:3 minimized 126:16 minimizing 96:17 minimum 77:13 80:8,20 minute 28:14 minutes 8:19 35:22 94:4,6 133:4 142:8,18 misguided 112:5 misinterpreted 34:19 misplaced 68:3 mispronounce 95:2 misquote 139:16 misses 105:2 missing 41:13 mission 104:19 109:14 Mississippi 143:7 misstated 113:5 mistake 9:14 mistakes 9:15 misunderstanding 45:10 miswired 26:6,13 26:18 27:5,6 44:4 44:12 63:13,14 67:17 miswiring 40:12,18 41:16 42:1 45:3 51:3 63:19 66:5,9 66:19 mitigate 56:19 mitigated 73:11 mitigating 68:14 71:10 mitigation 74:8,13 model 18:21 modeling 35:17 136:22 137:3 138:5,15,19 modifications 10:18 moment 4:21 5:1 5:17 momentarily 16:17 monitor 42:8 58:9 61:16 monitoring 42:11 61:13,14 78:15 81:10 82:6 107:14 Morawetz 121:20 121:22 122:1 124:18 Morrison 128:2 motion 143:2,12,13 145:7 Moure-Eraso 1:11 2:4 3:3,6 13:6 14:7 15:7 82:15 86:5 91:18 93:9 93:15 133:3 142:21 143:16 144:20 145:5,10 move 139:2 143:3 moves 76:9 mud 21:17,20 23:9 33:13 34:12 35:1 35:4,5 36:10 117:3,5 Mulcahy 1:17 2:13 14:17 33:2,4 89:7 128:17,22 129:8 129:12 130:2,6,19 131:2,10,15,17,18 132:15,19 133:15 134:1 135:17,19 136:14,18 137:8 140:10 mute 6:1 N NAE 40:17 nailed 126:8 naked 28:16 name 8:13 95:2,6,6 95:16 103:21 108:22 112:20 125:8,8,11,12 128:4 names 4:14 118:15

202-234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. Page 159 naphtha 73:7 national 57:12 76:10 83:19 84:8 nationwide 122:8 natural 21:4 63:13 96:5,15 99:16 102:15 nature 112:9 NBI 113:12 near 105:2 Nearly 6:14 necessarily 71:15 116:21 120:21 necessary 41:18 50:20 51:1 80:21 112:8 need 15:20 19:16 47:20 58:16 74:20 85:15 88:3 127:8 141:13,16 144:14 needed 32:19 53:11 needs 68:15,16 126:22 127:11 135:10 negative 79:15 119:10 126:1 127:10 neighbors 96:20 neither 60:15 networking 109:15 never 27:10 28:10 63:20 119:6 127:2 new 7:5,10 20:12 20:16 29:22 49:7 68:20 92:17 100:12,17 101:3 102:2 103:2 118:20 120:5 142:6 146:5 newly 17:14 night 26:10 27:1 30:7 nine-volt 25:22 26:1 27:2 45:15 45:16 47:11 non 3:14 79:16 144:11 non-compliance 79:16 norm 11:19 normally 38:15 94:14 119:7 note 5:17,17 8:17 12:15 17:2 73:19 noted 12:16 28:8 52:8 notes 105:17 notice 49:19 noticed 51:21 135:21,22 number 13:16 69:3 80:10 82:1 92:16 143:4 145:17 numbers 43:22 numerous 14:12 16:19 31:22 O Obama 141:15 obligations 80:2 observations 64:12 observe 93:17 obvious 15:15 obviously 84:9 144:12 occupational 14:1 72:11 122:7 occur 29:6 30:21 52:18 56:8 85:9 occurred 4:8 15:12 23:3 36:12,19 42:13 46:3 55:13 143:8 occurring 73:13 84:17 85:20 123:4 occurs 22:10 28:12 53:14 79:7 ocean 47:2 130:12 office 1:15 13:11,14 official 5:8 offshore 6:20 7:7 12:21 13:2 17:18 19:20 20:20 30:1 31:2 32:17 69:8 72:17 73:19 77:15 79:7 80:12 88:20 89:12 92:3,10,16 93:8 97:18 98:6 98:14,19,20 99:17 100:5 101:7,9 102:11,20 103:22 106:13 107:5,13 120:1 141:7 142:14 144:5 145:16 offsite 38:16 oh 113:2 114:21 119:20 125:1 127:17 129:22 131:19 137:10 139:4 oil 4:7 6:8,17,19 10:19 13:20 18:16 20:1,2,5,22 21:4 21:11,12,18 22:11 23:4,10,14,20 24:4,9 28:1 29:14 29:17 40:8 49:9 50:16 74:18 96:4 96:15 99:16 100:7 100:10,20 102:14 102:20 122:10 141:4,6,9,16 142:12,14 okay 9:2 19:11 91:18 113:2 119:20 124:22 128:3,5 129:4 130:1,5 131:8,13 131:19,20 133:6 135:12,18 137:2 139:15,22 140:7 140:20 142:21 143:16,19 144:22 145:3 omission 118:12 onboard 23:8 once 36:3 42:4 76:5 ones 56:1 100:17 122:6 ongoing 102:9 onshore 71:22 72:5 72:9,16 90:13 98:14 136:22 Op 91:7 open 8:16 27:14 35:15 42:17 44:13 45:5,18 47:16 76:14 138:18 143:17 opened 54:12,17 opening 2:3 5:7 6:4 8:21 42:3 44:16 46:5 operate 7:11 26:9 26:18,22 86:11 123:9 132:12 146:6 operated 25:7 130:6 operating 46:20 50:11 51:8 53:20 71:18 74:3 96:16 97:18 100:6 103:7 108:10 operation 60:3,7 77:10,16 88:6 118:9 132:8 135:10 operational 12:3 12:20 17:6 32:20 52:14 53:3 54:5 55:3 61:17 62:4 70:4 77:8 80:5,15 83:8 101:18 102:17 127:5 operational/orga... 88:5 operationalized 107:8 operationalizing 106:6 operations 13:22 28:9,11 30:1 92:10 95:18 97:15 98:14,21 99:5,18 100:13 101:10 105:12,15 111:3 127:8 operator 69:19 70:7 74:1 77:6,22 operators 69:12 92:3 109:21 opinion 92:9 118:20 opinions 115:17 opportunities 52:17 109:15 opportunity 5:11 95:20 97:7 98:4 104:1 105:6 106:11 115:7 120:4 opposed 26:19 66:17 opposing 27:8 opposite 44:3 Ops 91:5 option 34:5 60:11 options 48:22 order 38:22 57:7 57:10 74:10 ordinary 19:1 organization 106:10 109:12 112:11 organizational 9:17 10:20 12:3 17:5,7 20:10 32:21 52:10,15 53:3 54:5 55:3 61:17 62:4 70:4 77:9 80:5,15 112:21 original 41:12 originally 33:11 39:18 138:12 OSHA 72:14 outer 7:8 outside 24:17 28:20 37:18 50:14,15 128:14 131:4 139:13 outward 28:17 Overall 31:22 overboard 121:11

202-234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. Page 160 overseen 14:19 oversight 10:22 overview 7:21 17:13 owned 18:11 P P-R-O-C-E-E-D-... 3:1 p.m 23:2,9 24:1 35:18 50:9 page 2:2 116:4,4 117:19 paint 111:22 pair 22:19 30:8 panel 3:13 91:21,22 93:19 panelists 95:5 paper 88:15 parallel 72:14 parallels 72:3 paralyzed 26:20 part 10:8 35:9 37:18 50:1 62:3 71:3 74:4 78:19 86:17 93:20 94:1 94:11,18 124:8 134:4 partially 27:21 PARTICIPANT 85:21 132:13 144:22 145:3,6 participated 91:4 participating 9:6 particular 84:15 105:10,11 122:14 123:21 particularly 37:5 98:15 120:9,12,22 parties 77:5,19,20 78:14 80:1 89:10 107:17 parts 107:13 party 70:1 77:20 79:2,18 98:22 101:14 105:4 pass 36:3 68:6,19 123:19 passed 36:1,10 64:9 67:21 145:7 passing 23:5 path 117:12 pathway 20:21 Pause 19:12,14 peer 109:4,10 110:5 pending 124:8 people 23:8 33:5 37:3 40:11 54:13 54:15,18 73:2 85:6,19 86:2 94:4 94:8 105:13 120:16,20,20 125:1 128:19 134:20 perfect 54:10 perfectly 28:14 perform 57:5,7 68:2 88:15 110:4 performance 56:17 56:17,21 57:3,11 57:16,18,22 58:4 60:21 61:10 62:10 69:20 78:5,8 79:18 81:4,20 105:1 144:4 performance-bas... 134:19 performed 57:6 performer 88:13 performing 46:17 period 5:13 32:6 122:11 periodically 79:9 person 62:22 personal 115:17 personnel 10:21 74:15 persons 6:13,15 perspective 6:22 84:19 pertain 18:5 pertaining 81:20 petrochemical 7:6 petroleum 15:2 80:11 82:2 84:8 95:10,19 108:21 109:2,10 125:14 146:1 Ph.D 1:11 14:17 phase 16:3,3,6,9,10 40:5,10,14,19 41:10 44:9,10,14 44:16,20,20 45:11 45:13,14,21 46:1 46:20 66:8 113:22 114:2 phases 16:2 phenomena 49:18 50:2 phenomenon 30:16 49:7 phones 6:2 phonetic 120:15 photo 43:19 44:2 physical 3:18 14:18 33:13 34:7 35:6 36:5 37:7,12,22 54:6 physically 93:22 physicians 94:21 picked 115:3 picture 43:14,15 49:10 111:22 piece 19:1 20:13 21:22 53:6 55:2 65:1 106:3 120:5 pieces 75:15 pill 121:10 pink 59:3 pipe 18:22 19:2,3 22:9,13,16,20 23:17,21 24:6,7,8 24:13,14,17,19 25:3 27:17,19 28:5,11,13,17,21 28:22 29:2,12,15 30:14,21 32:6 36:16 37:11,17 38:7 47:21 48:2,6 48:12,14,16,17 49:1,6,21 50:5,11 50:13,15,18,20 51:16,18 59:4,5 59:15 60:1,6 72:20 110:15 136:16,19,20 137:22 138:2,11 138:13,17 139:12 142:7 pipeline 49:16 96:7 piping 21:19 place 11:6 12:12 36:4 53:13,19 108:5 118:10,21 123:3 placed 33:14 34:17 118:1,6,16 123:9 plan 74:5 143:20 planned 32:9 35:9 74:6 plans 74:8,14 plant 54:15 plants 90:15 platform 22:7 play 10:13 17:13 53:4 58:14 plays 55:9 please 5:3,16 6:1 8:11,17 113:6 140:10,19 pleasure 122:1,2 plod 51:3 plug 34:6 35:9 118:8,14 119:1 plugs 119:13 plume 73:1 plunger 43:8 plus 48:14 pod 25:9,9 26:6,12 26:22 41:6,8,9 42:7,17,19 43:2 45:2,6,16 47:6 51:6 64:8 67:8,9 67:10,11,19 128:13,14,16 130:6,22 131:4,5 pod's 26:8 41:15 podium 14:16 pods 25:12,21 39:5 46:18 65:3 point 5:15 41:14 42:14 48:3 51:9 52:12 63:6 88:9 89:22 111:5,7 126:20 129:12 131:11 135:16 141:2 point-to-point 41:7 41:11 66:6 points 83:5 86:3 Policy 95:17 pollution 75:6 poor 88:12 poorly 71:13 portion 37:17 position 7:17 10:5 35:15 146:12 positive 31:9 possibility 39:22 48:10,17,18,19 62:17,18 74:10 75:9 possible 68:5 112:1 144:17 possibly 46:2 Post 64:15 post-event 57:6 post-Macondo 63:3 73:20 potential 31:11 33:17 56:8 99:18 102:13 141:11 potentially 56:5 pound 136:9 power 24:21 25:4 25:19,22 39:2 41:19 65:2,16,22 66:10,18 67:5 powered 22:4 26:1 26:3 27:2 powerful 103:6 108:7 practicable 7:4 70:9 practical 74:11

202-234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. Page 161 77:12 80:7,17 practice 31:7 52:7 64:17 69:5 83:18 84:14 92:17 98:17 99:8,12 practiced 94:16 practices 7:16,19 10:6 17:6 32:14 61:17 83:21,22 84:3,6,15 85:12 92:5 101:17,18 102:18 107:1 144:4 146:11,15 pre-closing 60:16 preclude 39:17 predict 35:17 predicts 138:16 preliminary 16:3 prescription 94:22 prescriptive 134:17 present 1:10,14,18 4:5 18:7 39:9 40:3 55:14 presentation 2:8 5:8,10 8:2,11 15:5 33:1 51:22 69:1 82:11,22 83:4 88:9 92:14 116:7 117:20 presentations 124:16 presented 50:7 54:4 98:22 presenting 15:22 97:19 Presidential 40:8 100:10 101:12 102:20 104:15 pressing 48:15 pressure 18:22 19:3 21:5 24:5,7 24:12 25:5 28:20 29:5 39:6 42:9 49:12 50:13,14 65:19 66:3,14 126:1 127:10 136:10,12,15,18 137:18 139:1,4,5 139:8 pressured 49:13 presume 92:5 pretty 44:18 prevent 4:2 13:4 21:16 22:2,11 56:15,19 73:12 78:4 81:1 85:15 85:19 90:5 97:3 104:10 110:1 116:21 117:9 119:6 123:4,16 141:12 preventative 62:13 prevented 29:13 35:7 84:16 126:10 126:11 preventer 6:6 11:3 12:4,7 16:1 17:1 20:14 22:10 23:6 23:13 24:15 25:1 27:20 29:9 30:6 33:15 50:8 82:3 142:1,7 145:21 preventers 20:18 22:17 140:22 141:5 142:10 preventing 22:6 68:13 prevention 74:8,13 75:6,18 82:3,8 88:7 91:1 99:19 100:19 103:1 previously 28:8 35:11 58:4 primary 116:16,19 118:7,11 143:21 prior 13:19 79:7 98:12 private 128:5 privilege 113:9 probably 49:17 86:19 87:9 112:7 113:13 problem 28:10 36:11 60:5,9 91:12 problems 10:11 110:10 procedure 31:10 64:3 65:9,10,11 procedures 7:15 64:21 100:7 103:8 108:10 123:8 146:10 proceed 14:4 proceedings 6:2 94:9 process 6:22 10:18 11:10,18 13:22 32:7 34:9,14 35:1 35:10 42:10 52:4 54:15 60:18 61:4 62:3 65:13 71:1,4 72:21 73:8 79:18 81:18,19 90:10,13 97:5 99:22 100:6 104:19 processes 62:7 105:13,18,22 108:4,9 produce 43:7 produced 1:21 production 15:3 34:13 74:18,22 79:8 80:12 96:6 products 11:21 143:10 professional 109:12 program 69:21 93:16 98:21 programs 10:17 53:19 62:11 87:6 98:16 progress 98:6,7 106:12 progressed 50:16 progressing 55:10 prohibited 42:2 projects 8:7 promote 101:8 proper 142:10 properly 31:3 99:6 112:14 proponent 126:21 proposal 75:8 proposed 8:2 18:8 74:17 75:3,20 97:9 105:7 Prospect 20:7 protect 33:19 Protecting 96:18 protection 84:8 100:20 prove 24:18 110:20 111:2,7 proved 23:19 provide 10:22 17:18 52:10 65:2 95:20 97:6 104:2 109:14 112:3 provided 1:21 3:2 42:15 64:1 65:10 provides 73:21 providing 33:10 79:5 provisionally 124:7 PSA 52:12,22 psi 49:13 59:14 139:12,13 PSM 90:12 psychology 120:13 public 1:5 2:17 3:4 5:13 8:18 41:4 75:9 93:12 94:2 94:12 95:22 98:12 104:4 122:18 139:21 140:15 144:10,10 146:17 publicized 37:9 publicly 8:10 publish 79:22 80:11 146:1 published 15:13 16:5 40:9 44:7 84:6 publishing 41:1 111:12 pulls 43:8 pump 19:3 21:16 121:9,11 pumped 116:18 punctured 51:18 purpose 4:3 55:7 116:20,22 pushed 24:16 51:9 pushing 48:5 put 7:14 19:3 42:11 53:13,17,19 88:21 107:22 119:9,10 123:3 125:21 140:16 146:9 puts 10:4 putting 49:8 119:12 Q question 15:15 63:13,15 91:20 124:13 129:11,17 131:14 133:7 134:10 139:5 144:21 questions 2:15 5:11 10:5 82:12,16,18 83:3,6 112:13 113:21 122:21 128:6 129:20 140:2 quick 17:13 quickly 21:13 23:6 88:9 101:6 119:21 quite 53:5 94:22 115:20 120:18 122:19 123:6 quote 52:22 54:8 54:19 102:19 R R1 78:19 80:2,9 87:15 93:1 R2 79:22 R4 82:1 Rafael 1:11 2:4 3:6 raise 89:22 145:19 raised 112:13 ram 22:20,21 23:17

202-234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. Page 162 23:21 24:6,18 25:2,18 26:10,12 27:10,16 29:13 30:8,11 36:16 37:16,21 40:2 42:20 43:11,17 47:16 50:11,19 51:14,15,17 60:17 64:8 136:13 137:5 138:11,17 rams 22:16 37:18 38:4,14 39:18 48:16 59:21 60:12 60:13 134:11 range 83:22 rapid 101:1 rarely 31:8 rate 48:2 Ray 4:16 reach 24:17 113:6 reaching 21:12 read 53:1 76:2 95:12 124:20,22 135:16 reading 94:19,21 140:20 readings 128:22 ready 34:13 103:12 108:15 real 136:20 reality 51:19 realize 113:15 realized 45:11,15 45:20 realizing 102:12 really 52:2 53:1 61:14 68:17 114:7 114:9 117:15 119:21 139:20 reason 68:8 111:20 119:3 130:4 133:5 133:6 reasonably 7:4 70:9 74:11 77:11 80:7,17 reasons 39:19 rebuild 64:4 rebuilding 135:8 rebuilt 63:19 receive 11:16 received 11:12,14 124:11 receiving 89:16 rechargeable 135:6 recognition 106:8 recognize 8:20 53:15 83:21 85:17 127:22 recognized 49:9 50:2 52:6 57:13 110:3 recommend 89:19 135:2 recommendation 71:13 76:22 78:19 79:21 80:10 82:1 87:15 91:5 93:2 99:11 143:21 145:22 recommendations 4:2 7:13 8:3 18:8 71:10 75:21 76:1 76:2,6,7,8,12,13 76:18 85:10 90:19 90:21,22 91:2,22 96:14 97:9,17 98:2 100:12,22 102:8 104:16 105:7,22 108:3 120:14 124:1 133:7 135:3,13 143:9 145:18 146:8 recommended 64:20 82:10 91:7 92:12 98:17 99:8 101:11 134:6 recommending 87:5 recommends 65:12 106:19 record 95:14 140:16 145:1 146:19 recorded 63:20,22 records 79:12 116:4 recovered 36:22 recurrence 110:1 red 41:22 59:15,18 redirection 110:21 reduce 52:16 70:8 74:10 reducing 27:18 77:10 80:6,16 reduction 71:7 72:3,18 73:21 88:10 134:6 redundancies 31:15 redundancy 25:10 67:6 68:4 redundant 25:8 26:11 31:12 43:5 82:7 134:3 reestablished 51:19 refer 116:3,11 117:20 138:8,20 reference 117:14 referenced 97:22 106:17 references 117:16 referred 116:8,14 116:18 132:3 referring 126:9 refineries 90:14 refinery 13:18,22 14:14 72:6,7,20 73:5 refining 13:20 96:6 reflect 10:11 reform 141:17 reforms 141:12 regard 87:3,6 120:11 128:7 regarding 17:21 74:2 87:22 106:13 regardless 123:1 regime 12:12 86:15 90:4 99:2,3 regimes 12:13,14 92:7 Regional 1:15 13:12 regions 88:20 regs 87:3 regularly 96:12 regulated 72:10 regulation 71:21 74:18,19 87:8 92:17 107:3,16 121:8 134:16,19 regulations 3:20 18:5 32:17 63:4 70:12 72:14,17 73:15 84:15 85:2 85:6,7,14 88:19 89:6,10,18 102:1 106:17 118:20 132:21 133:8 134:17 regulator 75:12 77:21 79:1 106:10 regulators 9:11 100:2 101:15 103:13 108:16 135:13 142:11 regulatory 3:15 12:10,12,18,19 20:10 31:7 69:3 80:2 84:1,11 86:14 87:18 88:19 91:13 98:11 99:13 106:15 110:19,22 144:2,3,7 reinforce 101:15 reinterpret 44:11 45:12 reiterate 83:5 related 3:19 18:2 54:15 97:17,21 106:5 145:20 relative 90:20 release 11:10 18:15 21:10 122:10 144:13 releasing 73:6 112:1,3 reliability 25:11 54:10 57:4 78:10 81:7 82:7 reliable 31:16 reliably 32:5 59:6,7 remain 31:1,17,20 70:11 103:9 108:12 remained 27:9 remaining 112:15 remarks 5:7 6:5 remember 4:14,21 9:21 45:1 remotely-operated 38:18 removed 21:21 35:4 removing 34:11 35:4,6 rendered 27:13 142:7 reorganization 102:3 repealing 121:15 repeat 43:4 repeats 141:18 report 2:9 4:7,11 4:11 5:14 6:21 7:12 9:8 11:4,11 11:15,17 12:5,8 12:21 15:16 17:11 40:7,7,9 41:1,3 59:1 61:13 78:7 84:18 86:2,4 87:1 88:3 93:21 96:1 97:6,8,16 98:1,1 101:12 104:5 105:7,17,20 106:2 108:2 109:5 111:7 111:13 112:12,15 115:20 116:3,13 122:14,19 124:3 125:16 128:7,10 130:21 134:10 136:6 138:1,8,9 138:20 139:10,13 139:17 141:1,4,10

202-234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. Page 163 143:1,4,11,20 144:2,14 145:7,13 145:17 146:7 reported 29:16 78:22 reporting 106:18 reports 11:8 15:13 15:19 16:4 30:10 30:16 40:6,9,16 40:17 73:16 76:9 122:3 124:4 represent 109:16 Representative 141:19 represented 38:10 55:17 representing 109:2 represents 96:3 requested 75:8 requests 98:4 106:11 require 75:17 77:4 77:13 89:19 92:2 110:22 132:8,11 required 57:1,3 64:15 70:16 78:8 106:18 107:16 111:22 126:3,5,6 requirement 70:6 71:2 89:5 93:6 99:13 106:16 121:15 126:1 139:1,5 requirements 57:16 71:7 78:13 80:9,21 81:15 82:6 84:1 88:15 88:21 requires 37:22 69:12,19 89:4 90:15 98:20 121:8 requiring 75:9 92:4 requisite 73:14 reserved 94:2 reservoir 24:10 reservoirs 20:22 resolve 90:22 91:5 91:10 resolved 71:11,13 resolving 90:21 91:2 resort 22:18 resources 98:18 respond 96:13 responded 23:12 response 30:5 53:22 76:15 99:20 100:8,20 101:2 102:4 103:2 responsible 43:16 64:7 69:19 70:1 77:5,18 78:14 79:17 80:1 96:17 responsive 104:15 restating 112:20 result 4:13 27:4 30:15 31:10 44:9 71:14 99:4 111:2 resulted 16:22 92:18 resulting 6:19 18:14 32:14 71:9 72:21 79:10 111:18 results 34:18 44:8 44:11 45:12 retainer 118:14 reveal 16:11 29:22 revealed 30:15 reverse 65:22 Revette 4:18 review 11:10,13 79:1 97:4,6,8 100:3 105:6 109:4 109:10,19 110:4,5 111:18 141:22 142:12 reviewed 112:16 reviewers 12:5,15 109:4 110:8 111:4 112:13 reviewing 64:10 revise 82:2 revised 11:14 69:5 100:16 revisions 112:8 revisited 135:14 rewired 64:4 Richard 1:16 3:11 94:10 Richmond 72:6 73:1 rig 6:7,12,15 10:19 18:11 19:20,21 20:21 21:13,19 22:8,12 23:11,16 24:5,21 25:5,19 28:2 36:5,7,10,19 38:16 39:3,7,10 41:20 42:6 48:12 50:3,17 53:10 60:1 62:8 63:17 66:11 67:20,22 68:9 143:7 rig-specific 74:3 riggings 7:7 right 19:9 37:15 41:22 43:20 48:10 53:12 93:10 114:5 123:7 129:11 130:17 131:15 139:17 rigorous 7:17 86:13 146:13 rigs 7:3 29:6 64:15 rise 122:13 130:8 riser 22:9,12 23:7 23:15 24:5 rising 23:10 risk 32:8 52:7 70:8 71:7 72:2,18 73:20 77:11 80:6 80:16 88:10,22 90:12 120:1 134:5 134:6,14 risk-based 134:19 risks 74:5,9,13 road 145:15 robotic 38:19 robustness 54:13 81:17 rock 21:2 rocky 21:3 Rod 59:17 role 7:15 10:12 18:5 57:6 94:15 146:10 roles 55:9 room 5:19,22 33:5 49:15 120:20 root 123:22 125:18 Roshto 4:18 ROV 38:18 Roy 4:16 rubber 22:16 Rudolfo 112:21 rule 69:12,12,18,22 70:6 72:15 75:1,7 118:19 rulemakings 102:10 rules 103:2 ruling 125:22 run 43:6 ruptured 72:21 73:6 S S 77:4 safe 30:1 36:8 88:6 96:16 98:13 105:12,15 141:1 safely 31:14 safer 71:15 102:21 safest 134:13,15,20 safety 1:1,10,11,12 1:21 3:5,21 4:1 5:16 6:22 7:1 8:3 10:6,12 12:2,13 13:2,22 14:1,13 17:1 18:2,3,6,8 20:13 21:21 31:15 32:4,13,17,18,19 52:2,3,4,5,9,11 54:21,22 55:1,15 55:21 56:9,13,18 56:22 57:17,20 58:2,9,16 61:2,10 61:18 62:15,19 69:8,10,13 70:2,3 70:10,13,15,17,18 70:19 71:3,18,19 72:11,14,15 74:19 74:21 75:6,13,16 76:11,19,20 77:1 77:7,15 78:1,3,8 78:16,17,21 79:18 79:22 80:4,12,14 80:19,22 81:3,5 81:11,12,17,20,21 83:11,17,20 87:6 87:20,22 88:1,4,6 88:15 89:1,2,2,3 89:19 90:10 92:3 92:20 93:5 95:21 96:19 97:20 98:7 98:19 99:2,3,4,6 99:17,20 101:7,9 101:10,11,16,16 101:18,20 102:1,5 102:17 103:3,13 104:1,3,16,16,21 104:22 105:18,21 106:4,14 107:2,7 107:14,20 108:16 111:3 114:11 118:19 120:10 125:19 126:4,7,9 126:19,22,22 127:1,4 141:3,12 141:13,21 142:9 142:14 143:3 145:16 146:3 sale 97:14 Salerno 102:6 sank 6:16 satisfied 140:8 saw 43:2 138:7 saying 12:22 130:3 134:12 says 59:13,17 65:5 65:6 114:5 scale 122:9 scenario 39:21 49:1 49:4 scenarios 47:19

202-234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. Page 164 SCEs 111:1 scheme 78:21 schemes 81:10 School 114:18 schooled 94:16 Science 125:13 scientists 109:14 scrutinize 100:5 sea 20:2 21:1 22:1 22:7 26:7 130:16 seal 6:10 20:15 22:21 23:14 30:9 33:20 34:3,7 36:14 37:11 60:2 118:2 sealed 23:19 27:17 34:21 36:17 37:4 50:12,19 sealing 22:13 29:13 60:2 second 12:8 16:9 38:14 39:3 48:17 56:16 64:5 65:21 86:17 143:12,13 secondly 55:6 section 77:4 78:6 78:12 86:22 137:4 sections 24:16 secures 33:19 sediment 21:3 see 11:22 19:4 38:8 39:15 43:14,19,20 44:3 49:14 55:17 58:22 61:21 63:2 65:19 66:3 85:14 88:20 113:14 122:18,19,21 123:12 137:3 138:6,20 139:5 143:21 seeing 120:14 123:2 137:18 seen 4:10 109:7 131:9 sees 71:21 segments 96:9 SEM 42:1,7 46:18 51:7 68:6 99:13 SEM-A 67:7 SEMS 41:8 65:2 68:8 69:11,12,18 69:21,22 71:6 72:15 86:18 87:3 87:12,13,19 88:8 88:19 90:1,6,16 92:21,21 93:1,2,4 98:17,18,20 99:11 104:14,18,21,22 105:3 106:6,9,12 106:15,18,19 107:2,4,11,14,17 108:1,4,4,9 143:22 SEMS-A 107:4 Senator 140:17,21 send 47:15 51:10 110:2 sending 45:18 72:22 senior 11:19 95:17 115:12 sense 87:7,8 sent 59:12 separate 82:8 118:9 separately 118:6 118:11 sequence 42:21 43:13 56:2,6 sequentially 66:19 serious 6:14 110:10 122:5 seriously 19:18 97:1 104:8 service 35:8 96:8 102:4 109:22 session 139:21 144:11 set 11:18 16:7 42:5 58:5 62:12 65:21 123:11 sets 25:15 setting 91:15 seven 73:8 severed 37:20 39:3 shallow 100:13 Shane 4:18 share 75:20 109:20 144:9 shared 73:22 77:21 sharing 104:20 sharp 22:19 30:7 Sharples 119:22 120:2 121:19 shear 22:20,21 24:18 25:2,18 26:10,12 27:10,16 29:13 30:8,11 32:5,12 37:16,21 38:4,14,15,20 39:11,13,17,18 40:2 42:20 43:11 43:17 47:16 51:13 51:15,17 59:17,21 60:12,13,17 64:8 132:3 134:11 Shear/Deadman's 131:22 shearable 59:6,7 shearing 37:18 59:15,22 60:5 sheet 8:12 114:20 120:3 shelf 7:9 shift 99:1 106:19 shoe 116:12,14,20 117:1,14 118:4 shook 24:3 shortcoming 68:16 shortcomings 16:20 31:22 52:1 shortened 95:13 shortly 30:18 36:15 39:20 63:2 show 18:18 19:6 47:10 showed 37:7 showing 142:6 shown 53:11 54:22 shows 16:19 41:22 shut 6:7 30:22 shuts 29:7 side 5:20,22 28:16 28:18,22 137:14 sign 8:11 127:11 sign-in 114:20 sign-up 115:6 120:3 signed 8:16 127:9 significance 122:9 significant 17:20 69:9 73:18 75:3 97:20 106:4,8 significantly 96:11 107:17 silence 4:21 5:1 similar 4:3 20:19 31:18 75:10 76:10 83:18 87:5 123:17 132:8,10 simple 50:6 122:20 125:18 simply 9:16 single 104:13 106:3 singularly 104:13 sink 130:12 sinking 19:22 sites 72:9 sitting 3:10 40:20 situation 22:6 25:12 53:17 55:12 123:13 situations 29:10 38:9 size 59:4,5 134:16 134:22 135:2,9 skills 108:9 skip 19:9 skipped 54:16 slide 117:20 slides 19:16 30:3 83:2 slideshow 136:1 slightly 28:17 slurry 21:17 116:18 small 8:6 122:8 social 120:12 society 85:18 108:21 109:2,9,13 solely 97:12 solenoid 25:15,16 26:2,9,12,14,19 27:3,6,9,14 40:13 42:16 43:3,16 44:4,8,12,16 45:3 45:4,19 46:4 63:13,14,22 64:4 64:7 67:17 122:22 133:20 134:4 solenoids 42:3 43:5 93:19 110:14 135:8 solution 135:1,2 solutions 57:15 somebody 61:21 85:3 93:21 somebody's 129:2 soon 144:16 sorry 65:6 131:19 sort 84:13 87:12 116:8 120:12 sought 73:2 sound 45:2 source 24:2 space 22:14 23:18 24:6 50:15 SPE 109:11 110:2,5 110:7 112:10 speak 8:17 88:1 115:22 122:13 125:2,3 speaker 95:9 103:16 108:20 112:19 114:16 115:3 119:18 121:20 124:19 140:13 speakers 120:8 125:3 speaking 89:8 115:16 speaks 74:19 specific 52:17 55:6 58:11 69:22 72:3

202-234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. Page 165 75:5,14 90:12 91:11 99:9 111:6 128:6 135:5 specifically 62:10 88:2 98:7,17 111:1 116:11 128:9 133:22 134:2 specifics 17:21 111:13 specified 59:7 spell 95:6 125:8 spelling 112:20 spewed 20:2 spewing 6:17 spill 6:19 20:1 28:1 40:8 99:19 100:1 100:8,11,20 101:6 102:20 103:1 141:4,8 spilled 29:17 sprinkler 19:2 squeezed 37:19 staff 1:14 76:16 107:9,19 124:9 127:19 129:19,21 140:2,14 Stan 14:22 15:1 125:15 134:2 137:9 stand 103:11 108:15 standard 56:17,18 56:21 57:19 60:21 80:13,21 82:4 85:22 90:11,13 standard-setting 84:7 standards 3:21 57:11,13 58:4 69:4 78:6 81:5 84:1,10 85:2,14 92:17 98:15 100:12,16,17 103:9 108:10 141:14 start 13:11 15:5 41:6 46:10,12,14 56:10 83:16 93:4 128:12 139:9 started 42:7 46:2,5 46:6,7,17 47:3 99:22 115:5 starts 128:2 state 72:12,13 74:12 95:6,7 103:17 state-of 101:4 stated 59:21 98:12 102:6 statement 2:21 8:22 13:7 59:20 95:13,14 136:7 140:21 statements 2:3 12:11,17 140:16 142:17 states 7:14 29:19 72:14 77:2 92:9 146:9 status 76:13 stay 131:20 steel 118:15 stellar 88:17 step 33:7,9 55:19 65:14 Stephen 4:16 steps 43:12 63:6 stipulated 73:15 80:2 stop 11:20 28:1 36:6,21 55:9 142:2 stopped 46:4 straight 28:14 strange 123:14 strengthened 93:1 stricter 133:9 strides 92:19 97:20 106:4 string 119:2,8 126:13,15 strong 26:17 103:3 stronger 141:13 studies 14:13 Study 113:4,10 stuff 129:10 133:9 135:14 sub-sea 21:2 subject 76:3 78:22 125:4 submit 95:13 98:5 106:11 submitted 109:4 110:7 111:15 Subpart 77:4 subsequent 17:10 24:20 87:17 subsidy 100:7,19 101:1 substantial 50:12 substantially 11:14 24:8 success 17:3 successful 45:22 successfully 23:18 29:7 30:22 51:13 68:7,11 sudden 99:1 106:19 suddenly 23:11 sufficient 84:16 sufficiently 47:14 73:11 suggest 119:12 124:5 suggests 74:4 summarized 41:2 summary 112:2,10 superpower 102:13 supervised 13:16 supervisors 122:4 supplied 132:5 supply 65:4 96:8 support 73:20 96:9 99:1 101:16 supporting 12:16 supposed 25:10 43:21,22 44:1 61:22 117:3 suppression 89:15 sure 53:10,14,20 65:8 66:1 87:16 113:17 139:20 surface 22:7 28:18 34:6 39:1 130:13 130:15 surmise 128:18 surpassed 36:1 surrounding 47:5 survivability 57:5 78:10 81:7 survived 57:7 survivors 113:11 113:16 suspect 86:1 109:5 switch 21:14 Sydney 9:7 system 16:21 18:2 24:22 25:3,7,11 27:4 30:5 31:9,12 32:2 37:6 38:11 38:12,15,21 39:19 51:2,5 52:3 54:21 60:10,14,15 61:5 61:6,7 62:2 63:12 65:9,17 66:2,4,9 66:15 67:6,13,15 68:7,12,20 69:14 70:2,14,18 71:12 72:16 75:14 79:13 80:20 82:4,9 89:4 93:6 97:13,18 99:7 105:13 106:21 107:7 119:4,11 123:11 132:9,10 143:22 146:3 systematic 100:3 107:13 systems 3:22 23:1 25:8,15 32:11 52:3,5,9 55:11 57:8,9 61:3,18 64:13,14,18 67:12 67:16 68:1 69:11 74:19 78:11 81:8 82:8 84:11 87:10 88:16 89:2,15,15 89:16 97:13 105:18 106:5,7 116:17 132:1 systems-based 97:22 98:8 105:14 T table 2:1 5:5 14:8 93:18,18 tables 139:14 tackled 122:6 take 5:16 53:9 91:6 93:13 118:3 123:20 136:16 142:13,22 taken 38:17 43:15 79:15 129:1 136:10 takes 53:1 94:15 97:1 104:8 talk 58:15 61:12 63:1 94:5 115:7 140:10 talked 60:22 87:11 121:14 talking 55:22 56:4 93:20 113:17 118:4,8 119:4 132:13,16,17,19 talks 90:7,17,20 91:2 target 73:21 88:10 90:12 targeted 70:8 71:6 72:2,17 134:5 task 100:4 tasks 88:4 team 4:5 5:9,12 8:5 8:6 13:10 14:4,8 14:10 82:19,21 91:7 110:12,19 111:9,16 144:1 team's 5:9 technical 7:22 8:1 12:2 14:20 16:19 17:3,20,21 20:9 29:21 30:12,19 31:6 32:20 33:3

202-234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. Page 166 33:10 40:22 52:14 52:22 53:4 70:4 77:8 80:4,15 97:16 98:3 105:10 106:3 110:14 112:10 114:10 120:5 131:6 141:22 144:12 technically 111:11 122:15 technological 57:15 Technologies 120:1 technology 10:18 19:13 101:5 103:8 105:13 Ted 119:18 teleconference 1:18 3:8 tell 50:4 65:21 telling 136:7 temperature 46:16 128:14,15 129:5 130:8,14 temperatures 46:21 47:1,5,14 51:8 128:20 129:1 temporarily 34:10 temporary 23:20 35:10 36:18 terminology 17:18 terms 49:21 83:20 99:10 Tesoro 72:7 73:4 test 31:17 34:18 44:15 46:5 64:4,5 64:9 65:5,6 66:8 66:12,16,20,21 67:21 82:9 123:13 126:2,19 127:11 133:11,12 tested 34:18 46:19 49:12 testimony 48:11 102:5 testing 10:14 16:9 16:10,15 31:7,10 37:1 40:5,10,15 40:19 41:10 44:8 45:9,10 46:1,20 62:13 63:11,21,22 64:12,18,20,22 66:5,8 68:21 82:5 123:8 133:9 tests 45:14,22 65:21 67:4 Texas 13:17 14:14 thank 5:2 8:4,4 9:1 13:5,6 14:6 15:6,7 15:9 19:11 33:4 75:22 82:14,20 86:7,7 91:16,19 94:13 103:14,15 108:17,18 112:17 112:18,19 114:14 119:15,16,16 121:17,18 124:15 124:17 127:13 134:2 135:17 140:12 142:16 144:18,20 145:3,9 145:10 146:16 thanks 82:15,21 101:3 140:9 the-art 101:5 themes 110:11 theories 47:22 thermal 130:11 thickness 136:9 thing 56:12 90:19 113:20 114:7 117:18 121:6 122:20 123:17 things 45:8 71:15 116:8 121:4,12 123:2 think 9:21 53:6 54:19 60:20 67:2 67:14 83:18 85:16 86:19,22 89:7 92:10,14 93:11 111:5 114:11 115:4 120:9 121:1 122:15,17 123:1,5 123:17 124:4 125:17,20 126:20 126:22 127:3,7,9 129:14 133:15 134:13 137:15 139:18 144:15 thinking 46:6 third 16:8 26:21 39:5 48:18 77:20 89:10 98:21 101:14 105:3 107:17 thoroughly 17:9 84:11 thought 44:18 110:9 113:14,17 114:8,19 115:6 120:2 127:3 128:20 140:5 thoughtful 11:16 thoughtfully 123:3 thoughtfulness 124:8 thoughts 103:9 108:12 115:17 thousand 73:2 three 8:18 16:2 18:16 33:16 38:22 43:22 45:22 47:22 54:3 79:10 94:4,6 101:22 102:2 109:3 110:2,9 126:17 132:1 133:3 142:18 THURSDAY 1:7 ticking 141:11 tied 127:1 time 3:2 4:20 5:3 6:18 8:14 13:9 18:7,18 24:7 26:6 28:5 34:8 35:3 38:2,5 42:12 45:2 47:21 49:5 51:4 51:16 54:14 57:3 61:11 65:7 66:18 67:5,18,20 93:10 94:7 95:12 97:5 122:12 126:18 129:2 141:11 timeline 35:16 127:6 today 3:8 7:20 14:7 16:1 17:8,12 31:21 55:22 68:21 113:13 115:21 124:10 today's 4:4 tonight 11:8,22 12:9 tools 101:17 top 24:9 48:4,12 65:15 119:1 torn 124:2 total 6:18 115:4,10 touched 86:20 127:7 toughest 94:18 town 122:8 track 76:12 116:12 116:14,20 117:1 117:14 118:4 tracked 79:12,17 tracks 76:7 tragedy 9:5 11:7 13:1,4 tragic 73:12 103:11 108:14 109:19 141:13 142:2 tragically 23:19 training 10:21 103:7 transcribed 95:8 transcript 1:21 transformative 13:2 transition 59:10 transmitted 136:20 Transocean 10:15 16:5 18:11 32:8 59:12,19 60:5 63:16 64:2 124:21 124:22 Transocean's 62:3 Transportation 76:11 83:19 transporters 96:7 trapped 20:22 21:4 27:21 138:3 traveling 22:11 23:6 treated 134:8 treatment 16:22 tremendous 98:5 trial 113:19 114:1 tried 41:4 46:10 88:8 trigger 38:13,13,19 39:13 47:15 51:2 51:10 67:12 68:6 triggered 38:16 47:20 49:4 67:17 triggering 20:1 38:11 39:16,18 44:17 triggers 43:11 65:9 troubled 124:2 true 44:3 48:13 trust 113:18 114:7 try 42:7 46:13 53:14 123:18 trying 62:1 86:10 123:16,22 133:13 136:1 Tuesday 109:5 turn 27:15 33:1 68:22 91:16 142:19 turned 34:16 36:17 42:5 66:13 turning 66:17 turns 46:11 twice 139:19 two 4:6 5:20 6:16 9:12 11:4 19:22 25:8 26:15,15,19 27:7 30:12 32:11 33:12,16 38:1,8 40:21 41:17 43:5 44:1 45:8 47:19 55:1 64:6 65:6 67:16,22 72:3 76:4 79:6 81:4

202-234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. Page 167 96:1 104:4 110:17 116:17 117:22 124:4,5 134:11 140:16 two-step 32:9 60:8 60:9,18 61:4 62:2 65:12 type 12:14 118:9 119:13 123:4 types 11:2 53:2 117:21 141:7 typical 85:11 typically 88:14 90:3 U U.S 1:1,10,11,12,21 3:5 7:8,17 12:12 20:1 73:19 92:10 95:21 98:11,20 100:9 104:2 110:18,21 145:16 145:18 146:13 ultimately 4:1 16:18 32:16 44:22 68:17 unable 68:1 unacceptable 11:18 85:17 unanimously 145:8 uncharacterized 73:1 uncontrolled 21:10 uncovered 142:5 underbalanced 35:19 undersea 21:18 understand 121:12 understanding 37:4 undertaken 141:15 undetected 23:5 31:1,17,20 undocumented 32:14 Union 121:21 unique 10:5 unit 73:8 United 7:14 29:18 77:2 92:9 146:9 University 14:18 114:17 unopposed 51:12 unplanned 21:6 26:21 untested 126:14,18 untold 142:3 unusual 140:3 update 74:17 upper 23:12 36:13 138:10,17 Upstream 95:18 upwards 23:10 urge 142:11 144:1 144:6 urged 9:22 USA 115:10 use 20:19 32:22 38:19 57:14 58:11 58:13 81:15 90:1 114:1 117:21 119:14 132:11 133:19 134:3 142:11 users 64:3 uses 64:22 usually 84:6 V valid 111:5 value 11:6 96:21 valve 26:10,18,19 26:20 27:7,8,9,15 43:16 44:4,9,12 44:16,17 45:3,4 45:19 64:7 67:17 valve's 27:3 valves 25:15,16 26:3,14 42:16 63:22 64:4 Van 128:2 vapor 72:22 various 34:11 48:22 57:14 122:4 vary 84:3 vastly 145:15 vehicle 38:18 verbal 95:20 104:2 verbiage 111:1 135:15 verification 78:20 79:5,6,11,15 81:15,16 107:16 verified 68:5 79:16 verify 62:22 82:6 version 103:20 109:6,7 versus 83:14 90:8 vertical 137:13 vessel 129:1 vetted 112:14,16 video 29:20 33:9,11 33:12 39:12,15 40:13 43:3 135:22 videos 143:10 view 87:14 vigilance 53:22 97:2 104:9 visual 16:2 17:3 70:15 VOICE 18:21 19:17 volume 12:10,21 87:17 97:11 98:10 105:9 113:15 144:2,15 volumes 4:6 11:4 15:19,22 17:10 76:4 96:1 97:8 104:4 105:6 110:10,18 111:8 111:19,20,21 112:2,3,7,8,11,15 114:6,13 143:5 voluntary 73:19 vote 2:19 5:13 76:14,17 143:1,15 145:1 voted 76:3,6 145:13 voting 11:17 143:20 W wait 46:13 65:17,19 66:1,3 waited 66:14 walk 58:12 63:5 wall 136:9 138:3 walls 33:19 want 53:8,10 94:8 107:20 115:22 116:3 117:22 125:14 129:18 130:2 135:4 143:20 wanted 19:6 89:1 wants 59:17 warm 130:13 warmer 129:5 130:15 warned 29:8 warrant 110:20 Washington 72:8 72:12 wasn't 19:7 36:9 40:14 68:5 126:2 water 20:5 21:4 100:13 123:9 waters 6:17 Waxman 10:2 11:5 140:18 141:20 way 36:6 44:17 66:17 86:11 93:3 94:16 127:4 133:12 134:6 137:7,13 ways 20:19 124:6 141:17 we'll 19:9 we're 85:13 123:16 we've 127:17,17 136:2 weak 71:16 weaknesses 85:9 Weaver 114:17,19 115:1 week 11:15 110:5 weeks 9:13 weight 48:14 Weise 4:19 welcome 3:4 82:12 121:22 125:3 weld 137:6 well-controlled 7:15 146:10 WELL/DEEPW... 1:3 wells 82:4 100:20 115:13 134:21 went 45:20 146:19 weren't 33:8 Western 1:15 13:11 white 44:1 wide 83:22 Wilkerson 119:18 119:19 Williams 103:17,19 103:21 108:19 willing 141:17 wiping 117:2 wire 26:15 wires 41:13 wiring 41:7,11 42:1 43:21 66:7,12 wish 73:17 125:2 wishes 8:9,17 140:15 witness 48:11 wonder 46:2 82:17 wondered 87:1 wondering 83:7 word 91:9 words 52:4 99:2 work 10:4 11:16 22:18 26:16 61:4 61:6,16 103:12 106:9 107:9 108:15 115:12 125:13 workaround 32:9 60:8,9 62:2 workarounds 62:8 worked 13:20 25:12 45:11 47:4 60:10 workers 9:10,15 19:18 73:8 96:19

202-234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. Page 168 100:21 121:21 142:3 working 11:1 100:9 103:1 works 43:4 54:1 101:13 123:12 world 7:6 9:11 12:13 83:12,14 84:12 86:3 125:13 142:11 144:5 worldwide 9:20 13:3 52:6 122:8 132:16 worst 29:18 wouldn't 61:6 68:10 wrap 18:4 written 77:14 112:15 124:10 WRO 13:14 wrong 126:3 Wyatt 4:17 X Y Y103 43:16 64:7 Yeah 115:5 130:19 132:15 134:1 137:8,12 143:17 years 9:12 11:15 13:20 15:1,11 99:14 102:16,21 115:11 yellow 8:11 25:9,12 25:20 26:11,21 39:5 43:2 45:2,6 45:16 51:6 64:8 67:9,10,11,15,16 Yep 136:14 Z zone 118:3 zones 33:21 34:3 0 1 1 16:3 44:9,16,21 45:11,13,21 46:1 46:20 97:8 105:6 111:8 112:2,8 113:15,22 114:2 143:5 1,500 139:13 100 6:14 11 4:12,21 6:13 18:14 19:17 142:2 126 23:7 14 2:11 143 2:19 145 2:21 15 2:12 15,000 49:13 17 6:14 18:14 19:18 18 13:20 117:19 1911 90:7 1999 13:16 2 2 12:10 16:3 40:5 40:10,14,19 41:10 44:11,14,20 45:14 66:8 97:8,11 98:10 105:6,9 111:8 112:2,9 113:15,22 114:2 143:5 20 4:8 6:5 15:14 18:10 104:5 20-foot 137:4 2004 14:12 2005 13:17 14:14 2010 4:8 6:5 10:2 15:14 18:10 19:17 20:8 23:3 25:20 28:21 39:12 73:4 96:2 100:1 101:3 104:5 143:8 2011 101:8 2012 72:19 2013 74:16 75:8 2014 1:7 143:11 20th 18:1 19:17 23:3 25:20 28:21 30:7 210 143:4 22nd 39:12,17 23 116:4 25 102:7 115:11 250 77:4 125:22 250.1916 78:13 27-volt 25:21 26:3 26:8 42:3,13 51:3 67:19 27th 110:7 111:15 2nd 73:4 3 3 2:4 12:21 80:10 111:19 112:3,7 144:2 30 78:12 125:21,22 32 136:8 33 2:13 77:3 102:7 35 35:22 36 47:3,7 128:14 129:9 130:9,22 131:4,5 38 15:1 4 4 111:19 112:3,7 144:15 4:00 128:4 46 123:10 4614 59:14 4th 82:5 5 5 1:7 143:11 5,000 20:5 123:9 5.2 78:6 50 19:20 500 73:7 139:16 53 82:4 85:22 5th 109:11 6 6-5/8 136:8 6-5/8-inch 59:5,15 6.1 86:22 600 96:3 6th 72:19 7 7,000 139:12 70 46:21 47:6 70-degree 130:13 75 98:17 99:8 106:16 8 8:45 23:2 8:51 35:18 82 2:15 87 6:18 29:16 8th 10:1 9

NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W. (202) 234-4433 WASHINGTON, D.C. 20005-3701 www.nealrgross.com

C E R T I F I C A T E

MATTER:

DATE:

I hereby certify that the attached transcription of pages to inclusive are to the best of my belief and ability a true, accurate, and complete record of the above referenced proceedings as contained on the provided audio recording.

169 Macondo Well/Deepwater Horizon Public Meeting 06-05-14 1 169

FD06468 | 2014_美国_Macondo Blowout 与 爆炸 - Macondo Blowout and Explosion__最终报告_3.pdf

分类:06_境外及港澳台调查报告 | 年份:2014 | 地域: | 严重程度: | 场所: | 起火原因:燃气/爆炸 | 来源格式:pdf

Deepwater Horizon Blowout Preventer Failure Analysis Report To the U. S. Chemical Safety and Hazard Investigation Board CSB-FINAL REPORT-BOP(06-02-2014)

The Deepwater Horizon BOP stack at NASA-Michoud (with the upper LMRP portion on left)

This analysis considered the BOP examinations that were conducted by Det Norske Veritas (DNV) at the NASA Michoud facility near New Orleans, Louisiana. The examinations were in two phases, the first conducted for the Joint Investigation Team and a Phase 2 funded by BP. CSB and Engineering Services were excluded from Phase 2, but subsequently obtained examination information from that period.

CSB-FINAL REPORT-BOP(06-02-2014)

Page 2 of 83

U.S. Chemical Safety Board By Engineering Services, L.P. Contents 1. Introduction...............................................................................................................................3 2. Summary of incident failures and new opinions.......................................................................4 3. Incident summary timeline .......................................................................................................8 4. Incident progression: initial fluid displacement for the negative pressure test .....................13 5. Incident progression: negative pressure test ..........................................................................14 6. Incident progression: final displacement and initial oil flow starts .......................................18 7. Incident progression: oil flow increases..................................................................................20 8. Failure of the upper annular and sealing by a VBR...............................................................22 9. Incident progression: riser unloading and the explosion .......................................................22

  1. BSR failure to seal ...................................................................................................................23
  2. Pipe buckling at the Macondo well – effective compression...................................................24
  3. VBR friction ............................................................................................................................31
  4. Blind shear ram failure ...........................................................................................................32
  5. Results of drill pipe shearing using the FEA model ...............................................................37
  6. Blind shear ram capability during drilling.............................................................................38
  7. BOP accumulator capacity......................................................................................................39
  8. Pressure sensors in the BOP....................................................................................................39
  9. Conclusions/Lessons to be learned to avoid similar incidents................................................40

Appendices ......................................................................................................................................44 A. Incident Post-Explosion Events...............................................................................................44 B. BOP Stack Components ..........................................................................................................45 C. Condition of BOP as Found ....................................................................................................51 D. VBR Closing Force Calculations on the Bowed Drill Pipe.....................................................53 E. FEA Modeling of BSR.............................................................................................................58 F. Control System: BSR Actuation Scenarios.............................................................................61 G. Temporary abandonment draft procedures illuminate the differences for various options.61 H. BOP Accumulator System.......................................................................................................63 I. Location of Drill Pipe Within BOP.........................................................................................78 J. Top Drive Position at Time of Explosion................................................................................80 K. Change in Length for Drill Pipe Buckling Above the BOP....................................................80 L. Drill Pipe Separation Above the Upper Annular ...................................................................81 M. Rig Movement After Explosion...............................................................................................83

CSB-FINAL REPORT-BOP(06-02-2014)

Page 3 of 83

U.S. Chemical Safety Board By Engineering Services, L.P.

“Complex systems almost always fail in complex ways.”1 Such was the BP Deepwater Horizon blowout. While multiple safety barriers had been intended, all were penetrated by complex, multiple failures caused in total by unrecognized technical issues, procedural weaknesses, and human errors. This report is organized into an Introduction, Executive Summary, Incident Progression and Failure Discussions, Conclusions/Lessons, and Appendices. Reports by other organizations were considered and are referenced.2 1 Introduction The explosion on the Deepwater Horizon (DWH) floating drilling rig on the evening of April 20, 2010 was the result of four sequential failures of barriers and tests, as has been identified in previous reports.3

  1. Cement failed to seal the hydrocarbon formations from the wellbore.
  2. The negative pressure test failed to identify that the well was not sealed.
  3. After the negative test, the crew failed to detect that the well was flowing until gas and oil had nearly

reached the surface, and were well above the blowout preventer.

  1. The blowout preventer failed to stop the flow and seal the well long enough for corrective actions to be

taken. The blowout preventer (BOP) was the last failure before the explosion. The BOP is a complex arrangement of subsea components, designed with multiple functions to shut in a well. A Joint Investigation Team (JIT) was formed by the Bureau of Ocean Energy Management, Regulation and Enforcement (BOEMRE) and the United States Coast Guard (USCG). BOEMRE contracted Det Norske Veritas (DNV) to conduct a Forensic Examination of the BOP, which had been recovered and brought to a USCG base at the NASA Michoud Booster Assembly facility, near New Orleans, Louisiana. The objectives of conducting tests on the recovered BOP included determining the “performance of the BOP system during the well control event, any failures that may have occurred, and the sequence of events leading to failure(s) of the BOP.”4 Five other parties were organized along with the U.S. Chemical Safety Board (CSB) into a Technical Working Group (TWG): BP, Transocean, Cameron, U.S. Department of Justice, and the Multi-District Litigation group (MDL). The TWG served to review and approve protocols and to approve/disapprove any deviations in the test

1 Columbia Accident Investigation Board Report on Shuttle Tragedy; also quoted in the National Commission Report, pg. viii. 2 BP Report: Deepwater Horizon Accident Investigation Report, September 8, 2010. National Commission report: Deep Water – The Gulf Oil Disaster and the Future of Offshore Drilling – Report to the President, January 2011. Chief Counsel’s Report: Macondo – The Gulf Oil Disaster, Chief Counsel’s Report, February 2011. DNV Report: Forensic Examination of Deepwater Horizon Blowout Preventer, March 11, 2011, and Addenda, May 2, 2011. Transocean Report: Macondo Well Incident – Transocean Investigation Report, June 2011. DOI Report: Report Regarding The Causes Of The Macondo Well Blowout , Department of Interior, September 2011. NAE Report: Macondo Well–Deepwater Horizon Blowout: Lessons for Improving Offshore Drilling Safety, National Academy of Engineering. National Research Council Report, November 2011. 3 BP Report; National Commission Report. 4 DNV Report, page 1

CSB-FINAL REPORT-BOP(06-02-2014)

Page 4 of 83

U.S. Chemical Safety Board By Engineering Services, L.P. procedures as the need arose. The TWG members had a closer level of access than other party representatives in witnessing the actual testing. In addition, USCG, FBI, NASA, and EPA had various responsibilities at the test site. CSB contracted Engineering Services LP (ES) to assist in the BOP examination and analysis. An ES engineer usually served as the CSB TWG representative, although CSB staff also served in this role at times. After a testing plan was approved by the participants, the physical testing started November 15, 2010 at the NASA Michoud Booster Assembly Facility, outside of New Orleans. Testing was largely suspended from December 27 until January 28 for protective building construction. The site work, which was later referred to as Phase 1 BOP testing, was declared over by DNV and BOEMRE representatives on March 4, 2011. ES had a representative onsite along with a CSB investigator for essentially all Phase 1 BOP testing. ES provided advice to CSB and the TWG regarding test protocols and implementation. Some materials testing of samples from the recovered drill pipe was performed at the DNV Columbus, Ohio laboratory. An ES engineer monitored that testing. ES also provided ongoing interpretation of the examination results to CSB and to the TWG. For this report, the test results were analyzed along with various documents from CSB and public sources to further assess the incident failures and their technical and operational root causes. There was a Phase 2 of the BOP examination that excluded CSB and ES, but Phase 2 documents, photos, and videos were subsequently made available and considered in this report. In this phase, additional tests were conducted and some components further disassembled. In analyzing the BOP examination information, it was necessary to also study the incident well flow and the production casing loading. As a result, this report makes findings not only about the BOP equipment and well control procedures, but also about the negative pressure test and a likely wiper plug or production casing failure. 2 Summary of Incident Failures and New Opinions At least seven equipment and procedural failures occurred, listed below in chronological order. While ES agrees with many of the findings in prior incident reports, it notes important differences, with five new opinions on technical and operational aspects. Failures #1 and #2: The production casing cement and the cementing float valves. Both failures have been described in previous reports5. ES has nothing to add to these reports, which addressed why the cement sealed neither the annular space nor the casing shoe, and that the dual float valves also did not prevent flow from the casing shoe. The negative pressure test that was performed should have helped prevent these failures from leading to a well control event Failure #3: Negative pressure test. A negative pressure test of the wellbore identified the lack of integrity, but the crew failed to interpret it correctly due to are several contributing causes, summarized next in chronological sequence. These are ES opinions, many of which have been also identified in one or more of the prior reports. New opinions are identified. Cause: Under-displacement of test fluid. The spacer fluid was under-displaced, leaving part of the spacer below the BOP and adversely affecting the test interpretation.6 The calculated under-displacement of 65 bbls of dense spacer left below the BOP would have a height of about 1500 feet and increase the annular

5 BP report, pg. 54+; National Commission report, pg. 95+; Chief Counsel’s report, pg. 67+, Transocean Report, pg. 27+, DOI report, pg. 41+. 6 Transocean Report, Appendix G, iii.

CSB-FINAL REPORT-BOP(06-02-2014)

Page 5 of 83

U.S. Chemical Safety Board By Engineering Services, L.P. hydrostatic pressure in the annulus, substantially reducing surface kill line pressure. The kill line pressure would be later used to interpret the test results. Analysis of the real time data indicates that measured returns flow rates during the second displacement were substantially less than rates calculated from pump strokes. An attempt to account for this with a reduced pump efficiency resulted in a mismatch of standpipe pressures. ES believes that the cause might have been a loss of well integrity, either past a failed wiper plug in the casing shoe or an unidentified casing leak. Either of these would be counter to the positive pressure test of the casing earlier in the day.7 Cause: Failure to recognize improper drill pipe pressure at the end of the displacement of test fluid. When displacement pumping stopped, the crew apparently did not recognize that the drill pipe pressure was substantially higher than a correct displacement should have indicated (2,325 psig vs. 1,600 psig). This higher pressure was caused by the volume of spacer fluid that was left in the small annulus below the BOP. Because this annulus was smaller than the intended riser location, its height was increased, causing the greater U-tube pressure on the drill pipe. Cause: Bleed volume was too large. The crew did not behave as if they were aware that the negative test bleed volumes were substantially greater than compressibility of the well fluid would explain. The excess bleed volume was an indicator of either a well integrity or test setup problem. Cause: Misinterpretation of drill pipe and kill pressures as indicating a successful test. In the final negative pressure test, the crew incorrectly interpreted the lack of kill line pressure and flow as a successful test, even though the drill pipe pressure was 1,500 psig. It should have also been zero if the test was successful. The drill pipe pressure is a strong indicator of a failed or at least an inconclusive test. ES simulation calculates that the dense spacer fluid extended about 600 feet up into the kill line (from calculated kill line bleed volume). Adding that increased head to the calculated dense fluid below the BOP, the calculated kill pressure is only about 800 psi. As no kill line pressure was observed at the surface, ES theorizes that the viscous, gelling nature of the spacer fluid could have plugged the kill line, preventing this pressure from reaching the surface.8,9 The absence of kill line pressure gave the decision makers a flawed foundation for a positive test decision. Cause (new opinion): Did not utilize BOP pressure sensor data to aid in test interpretation. The DWH was equipped with two BOP pressure transducers that could be read by the driller. If checked, they should have shown the crew that the BOP pressure was consistent with the high drill pipe pressure, indicating a failed negative pressure test. There is no evidence that the crew looked at the BOP pressure sensor readings during the test. These sensor pressures had been recorded by the crew earlier in the well during a well control event a month earlier.10 Failure #4: Well influx detection. Starting about 8:50 p.m. during the final displacement, ES calculates that the well became underbalanced and began flowing through casing shoe via the failed cement job and float valves. By about 9:10 p.m., the calculated flow was 9 BPM (bbls/minute), and the calculated pit level had gained about 60

7 Transocean Report,pg. 91; Appendix G, 73-74; came to similar conclusions regarding lost pump volume, and the leakage location being either past the wiper plug or an unidentified casing leak. 8 National Commission Report, 106, 324, note 82. Chief Counsel Report, 151. The CC Report also noted that this material had never been tested for this application, that there was no operational reason to use this spacer, and that the lost circulation material spacer was pumped into the well to avoid disposal of the material as a hazardous waste pursuant to the Resource Conservation and Recovery Act (RCRA). 9 It also possible that a kill line valve on the BOP was accidentally closed during the test, but this is speculation with no evidence. 10 DNV Report, Vol. 2 (March 10, 2010), F-57 to F-61.

CSB-FINAL REPORT-BOP(06-02-2014)

Page 6 of 83

U.S. Chemical Safety Board By Engineering Services, L.P. bbls (over prior 16 minutes).11 The crew did not identify a problem with the returns rate or pit level, likely for reasons discussed in other reports.12 At this time, believing that the water-base spacer had reached the surface13 and no further synthetic oil mud remained, the crew diverted the well returns overboard to dispose of the spacer fluid. This action effectively removed any further measurement of pit gain, an important measurement in monitoring well control By the time the crew detected the well flow by mud erupting through the rig floor, the well flow rate had reached 40-100 BPM, setting up a highly unusual, extreme flow condition that the BOP would be asked to stop and seal. Failure #5: Diverter system did not redirect gas and oil flow away from the crew and the rig: The crew had set the diverter to flow the mud-gas separator, which was overwhelmed by the high rate. As a result, gas engulfed the rig floor and the rig generally. The gas quickly reached an ignition source for the explosion. One of the issues is why the diverter flow was not set up to go directly overboard instead of the separator, which may have prevented or delayed the explosion. This failure, its consequences, and causes have been well covered in previous reports.14,15,16 Failure #6: The BOP upper annular (UA) preventer did not seal the well flow. If it had sealed, the amount of oil and gas entering the riser and then escaping at the surface would have been substantially less, reducing the severity and probability of the explosion. As discussed in the Transocean report, the failure was likely caused by erosion of the preventer rubber.17 Later a VBR with similar finger design and rubber components successfully sealed the flow, until BSR failure (next item) opened a new leak path. A VBR closes more rapidly than an annular, reducing erosion potential. Failure #7: The BOP blind shear ram (BSR) did not seal. Whether actuated by the AMF/deadman at the time of the incident, or the later autoshear ROV intervention, BSR failure led to the protracted release of oil and gas. The BSR failure to seal was caused by the drill pipe being off-center, due to buckling from compressive load, leaving it partially outside the cutting blades and preventing full closure.18 Cause (new opinion): High internal pressure contributed to buckling the drill pipe. ES believes that pressure differential between the inside and outside of the drill pipe must be considered in assessing buckling loads and the amount of drill pipe deflection within the BSR. This engineering principle, often known as “effective compression,” is well recognized in many petroleum industry contexts.19 Force to buckle pipe: ES calculations indicate that well flow axial forces alone were insufficient to buckle the pipe at any time until the vessel sank. However, for a proper analysis, pressure must be also considered; doing so reveals that the DWH drill pipe could be buckled by flow rates within the assumed Macondo flow and

11 Flow rate and pit gain are from the ES simulation calculations. 12 BP report, pg. 93+; National Commission report, pg. 110+; Chief Counsel’s report, pg. 165+, Transocean Report, pg. 103+, DOI report, pg. 99+ 13 Chief Counsel Report, 179 14 Ibid, 194, 199, 237 15 BP Report, 112-122, 128-129, 138 16 Transocean Report, 31, 106, 144, 155, 174, 177, 193 17 Ibid, 154 18 Initially identified in DNV Report, 6, and supported by this study. 19 The concept was considered in the Transocean Report (Appendix M analysis, pages 1 and 28), but was not explicitly cited in the main report. The fluid mechanics concept was also cited in the NAE report (page 53), but was not pursued further. Also, the DNV Report (page 8) recommends additional study of “Computational Fluid Dynamic simulation of the flow through the drill pipe.”

CSB-FINAL REPORT-BOP(06-02-2014)

Page 7 of 83

U.S. Chemical Safety Board By Engineering Services, L.P. pressure envelope, as determined from simulation matching to real time data. The engineering concept to consider pressure is called ‘effective compression’, which this report discusses and applies to the Macondo BSR failure analysis. While not previously recognized in any published material (that ES could locate), effective compression can affect BOP performance due to buckling-related off-center pipe under high drill pipe pressure conditions. Drill pipe compressive buckling load from above and the potential impact of Variable Bore Ram (VBR) friction on the incident: An alternative method for the buckling load to have been applied is by the weight of the drill pipe above. This requires (a) that the pipe connection and support by the top drive fails (unknown, but possible by the time of the autoshear actuation) and (b) that the closed VBR develops enough friction to support the net weight of the drill string, about 178,000 lbs.20 (ES analysis indicates that low friction is not an essential assumption for buckling during the AMF/deadman timeframe (near the time of the explosion) because differential pressure dominates the causes of buckling load at that time. This analysis is discussed in the body of this report.) ES could not find documented test information on VBR friction. Undocumented anecdotal field experiences support low friction (10,000 to 30,000 lbs.),21 but are not conclusive for the DWH situation of high well pressure and offsetting zero closing pressure. Well control manuals describe a procedure for closing a VBR as a designated hang-off rams and then lowering the drill pipe to mechanically hang it by a tool joint on a pipe ram/VBR.22 This procedure is often employed in response to a kick and requires that VBR friction be low enough for the pipe weight to pull the pipe down through the closed ram until the tool joint makes contact. If the friction is too high for the available weight, the tool joint would be left some distance above the VBR, an undesirable and risky situation. If actual test data were to reveal that VBR friction can be high enough to defeat this hang off procedure, an industry safety improvement would be to inform drilling personnel of friction/weight limitations and alternative response steps. Other items relating to the BSR

  1. New opinion. Which VBR ram(s) were closed by the crew? ES believes that the crew closed only the

middle VBR ram and not the upper one. ES calculations reveal that the buckling deflection at the BSR from two closed VBRs was too small compared with what was actually determined by the BOP examination. The deflection from only the middle VBR being closed essentially matches the actual drill pipe position found in during post-incident examination. In the analysis, the upper VBR was subsequently closed by external sea water pressure being higher than VBR wellbore pressure, causing a closing force, and fully closing after the BSR sheared the drill pipe.

  1. Precharge pressure in the BOP accumulators (which supply power hydraulic fluid to the AMF/deadman

and autoshear systems): The precharge pressure met API standards. A higher precharge could have been used and would have provided a greater margin of reserve power than the API design factor of 1.10,

20 The VBR friction would have needed to support the entire string net weight (above and below the BOP). Air weight was about 208 kips (1000 lbs). Part of this weight was supported by the buoyancy/well pressure effect, which ES calculates at 22- 30 kips for an assumed range of 22-29 BPM blowout flow rates, leaving a net load of 186,000 to 178,000 lbs. (String weight is without the lower 3 ½” section, which ES believes may have fallen off during the final displacement – See report section 6

21 Various personal recollections reported to ES. 22 Examples include Transocean Well Control Handbook, Section 5.3: 1 (BP-HZN-CSB00079189) and BP Well Control Manual Table 4.2.2 (BP-HZN-CSB00163461).

CSB-FINAL REPORT-BOP(06-02-2014)

Page 8 of 83

U.S. Chemical Safety Board By Engineering Services, L.P. giving a somewhat higher final closing force on the BSR. However, FEA analyses by both DNV and an ES contractor indicated the additional force, by itself, would have been unlikely to seal the BSR.23

  1. New opinion. Shearing capability of the BSR shear packer, model SBR: ES calculations show that the

SBR model packer used in the DWH BOP did not meet Cameron’s published design bulletin on shearing the 6 5/8" drill pipe that was used for essentially all of the DWH drilling at Macondo.24 While 6 5/8" pipe was successfully sheared by the BSR in a 2003 DWH incident,25 this singular case (without a documented actual shear pressure safety margin) does not establish reliability, especially considering Cameron’s product advisory and revised ratings issued in 2007-2008. (The Cameron basis was met for 5½" pipe that was in the BOP at the time of the incident.) A more efficient shear packer, the DVS, was available, which was rated for the 6 5/8" pipe, and shears 5½" pipe at a lower power fluid pressure.26 It is not known if the DVS would have had a better chance of completing shear and sealing with the drill pipe in the buckled location at the time of the explosion. ES concludes that the BOP AMF/deadman system likely actuated the BSR. The details of this opinion are contained in the separate ES Deepwater Horizon RBS 8D BOP MUX Control System Report. 3 Incident Summary Timeline27 Activities leading up to loss of well control and a fatal explosion April 20, 2010. Operations to temporarily abandon the Macondo well included a negative pressure test, whose purpose was to determine if the recently installed production casing and cement job adequately sealed against flow from the oil reservoir.28 While the negative pressure test was not a regulatory requirement, BP elected to perform it before setting a cement plug inside the casing for the temporary abandonment.29 See Appendix E for a discussion on the risk associated with various iterations of test procedure considered by BP. Earlier in the day, a positive pressure test of 2,520 psig was successfully held under closed blind rams for 30 minutes, demonstrating outward pressure integrity of the production casing down to the wiper plug located at the top of the float collar. However, the positive pressure test could not verify integrity below the wiper plug where the shoe cement was set.30 BP engineering developed a general procedure during the few days before the test,31 and the rig-site team (BP, Transocean, and M-I SWACO) developed the specific operational steps.32 A portion of the well drilling mud (14

23 DNV report, Appendix G: 14. 24 IADC Daily Drilling Reports, Deepwater Horizon, February 16, 2010 to April 8, 2010. 25 BP Report, Appendix H, p. 234 26 The NAE Report discusses the differences in SBR and DVS shearing efficiency and centering capability, 42, 47 27 Clock times, displacement volumes, and other data from the BP Deepwater Horizon Investigation Report. Appendix D is the source of real-time data used in this report. 28 When a rig disconnects from a deepwater well, the hydrostatic pressure contribution by the riser fluid is replaced by the lower sea water density, resulting in a pressure reduction. Often the resulting hydrostatic pressure is less than the formation pressures, thus losing a barrier against flow. 29 BP Report, 39. 30 Transocean Daily Drilling Report for April 20, 2010, between 10:30 a.m. and 12:00 p.m. (TRN-USCG_MMS-00011646). 31 An email of April 20, 2010 (10:43 a.m.) from Brian Morel to Vadrine, Kaluza, et.al. contained plans for the next few days’ activities, including a negative test procedure: “RIH [run in hole] to 8367'; Displace to seawater from there to above the wellhead; With seawater in the kill close annular and do a negative test ~2350 psi differential.” BP-HZN-CEC008574.

CSB-FINAL REPORT-BOP(06-02-2014)

Page 9 of 83

U.S. Chemical Safety Board By Engineering Services, L.P. ppg synthetic oil-based fluid) was to be replaced by lower density sea water (8.55 ppg), thus reducing the hydrostatic pressure in a controlled manner. A leak would cause a contained, detectable surface pressure and/or flow during the test.

Figure 1: Fluid circulation for negative pressure test33 As illustrated in Figure 1, a circulation pipe was run to a depth of 8,367' (of the 18,304' total well depth) to begin displacement of the drilling mud from 8,367' upwards.34 Pumping started with a large volume (421 bbls35) of a viscous and dense (16 ppg) water-based spacer fluid, followed by sea water.36, 37 The plan was to pump water until all spacer fluid was above the blowout preventer (BOP). Pumping was stopped at 4:54 p.m. to conduct the negative pressure test.38

32 Chief Counsel’s Report, Chapters 4.5 and 4.6. 33 Chief Counsel’s Report, Figure 4.6.6.; failure annotation added by ES 34 The circulating string was 6 5/8" drill pipe from the surface to either (a) 4,103' (Transocean Report: 89) or (b) 4,177' (BP Report, Appendix W, Table 1.4), 5½" drill pipe to 7,546', and 3½" tubing pipe to 8,367'. The difference in the reported 6 5/8” drill pipe depth is not significant in the failure cause analysis. 35 TO Report, Appendix G, 56. 36 The BP Report states that a 30 bbl fresh water spacer was also pumped just after the 16 ppg spacer, based on information from M-I SWACO (Appendix Q). The Transocean Report (Appendix F, page 57) states it might not have been pumped and notes that it might have been done via a pit washing (and part of the reported sea water volume). ES found a slightly better simulation match to real-time data with the additional volume. 37 Well volumes: Circulating pipe = 200 bbls; riser annulus = 1644 bbls; annulus BOP to bottom of circulating pipe = 172 bbls; below circulating pipe = 507 bbls. 38 BP Report, 25.

CSB-FINAL REPORT-BOP(06-02-2014)

Page 10 of 83

U.S. Chemical Safety Board By Engineering Services, L.P. ES concludes that much of the spacer did not clear the BOP as planned.39 A portion of pumped both spacer and water volume apparently went below the drill pipe, replacing mud that leaked out of the wellbore, as indicated by ES simulations to match real time measured drill pipe pressures. These pressures are driven by both flow rate and wellbore fluid type locations. The leak possibilities were in either the casing or the wiper plug in the lower shoe. ES could find no evidence or technical reason why either of these should have leaked, but a leak assumption was necessary to match the real time data. For the ES simulation figures presented later, it was assumed that the leakage occurred at the casing shoe, but leakage at the casing crossover (12,488 ft.) also provided a good simulation match and led to similar calculation results for the wellbore pressures but with slightly lower flow rates at the possible times of BSR actuation. An annular preventer was closed to conduct the negative pressure test, initially using the drill pipe to sense pressure down the well. After attempts to bleed the drill pipe pressure to zero failed, the test was switched to the kill line, where a no-pressure/no-flow condition was achieved. Not reconciling the kill line pressure with the high drill pressure, the crew erroneously judged the test successful. At 8:00 p.m., displacement of the remaining drill mud with water resumed. Soon, as planned, the well hydrostatic pressure on bottom fell below the reservoir pressure. At about 8:51 p.m. (from ES computer simulation), reservoir flow into the wellbore through the casing shoe began at a slow rate. As time progressed, the oil and gas level rose in the well as depicted in Figure 2.

39 BP Report, Appendix W pg. 19; Transocean Report, 91, and Appendix G 73-74 and Item 5.1.1, 145

CSB-FINAL REPORT-BOP(06-02-2014)

Page 11 of 83

U.S. Chemical Safety Board By Engineering Services, L.P.

Figure 2: Key events in BOP operations after reservoir flow began At 9:08 p.m. (21:08), the crew determined that the first of the spacer had reached the surface and shut down the pumps for a sheen test40 to check acceptability for overboard disposal.41 Next, the return path was redirected overboard and pumping resumed.42 At this time, the ES simulation indicates about 9 BPM (bbls./minute) was flowing from the well, and the pit gain was about 60 bbls over 16 minutes.43 The crew should have noticed at least one of these significant flow indications, leading to closure of the BOP. They failed to do so for the potential reasons discussed in other reports.44,45 At 9:31 p.m. (21:31), the driller noticed an anomalous pressure difference between the drill pipe and kill line, which had just been opened.46 He shut down the pumps to investigate. An effort began to bleed the drill pipe pressure down. Nine minutes later, mud overflowed onto the rig floor, and the crew began well control response actions. By this time, oil and gas had filled most of the well and had risen past the BOP into the drilling riser, a

40 In a sheen test, a sample is added to water for a visual determination if it causes a sheen, indicating an unacceptable oil content for disposal into the sea. 41 BP Report: 42; Transocean Report, 21:09 in Transocean Report, 30. Evidently a slightly different interpretation of real- time data appears. 42 Chief Counsel’s Report,,178. 43 ES computer simulation. 44 BP Report, “Monitoring the Well,” 89. 45 National Commission Report, ”Kick Detection,”: 120. 46 Chief Counsel’s Report, 180.

CSB-FINAL REPORT-BOP(06-02-2014)

Page 12 of 83

U.S. Chemical Safety Board By Engineering Services, L.P. serious danger since it will be able to rise and expand rapidly to the surface. The BOP could only stop more gas from entering the riser. Activation of the BOP, explosion, and operation of BOP emergency systems Even with the late detection, the BOP faced pressures that were within its design pressure capability, but other aspects created a situation that it failed to handle for reasons that will be discussed. Four of the Deepwater Horizon BOP shut-in functions were summoned, each of which might have been able to stop the well flow at the BOP:

  1. At about 9:43 p.m., the upper annular was actuated by the crew but failed to seal or materially reduce the

well flow.47

  1. At 9:47 p.m., the crew closed the middle VBR48 and obtained a seal. A large amount of gas and oil had

already passed the BOP into the riser. The riser flow accelerated that was powered by a rapid gas expansion flow blowing mud up into the derrick. Gas and oil quickly followed, exploding at 9:49 p.m.

  1. After the explosion, the emergency disconnect system (EDS) button was pressed on the bridge at 9:56

p.m.49 The EDS should close the BSR and then disconnect the riser from the BOP, allowing the rig to move away from the location. Both surface instrumentation and the failure of the riser to disconnect indicated a non-function of the EDS, attributable to the explosion severing the MUX (electrical communication) line to the BOP.

  1. In the aftermath of the explosion, fire and heat apparently also failed the hydraulic fluid supply to the

BOP. With this, the AMF/deadman50 back-up system should have self-triggered to close the BSR. ES believes that the AMF system did actuate the BSR in spite of problems in this control system. But the BSR did not completely close and did not stop the flow. Computer dynamic flow simulation and analysis of the incident ES used dynamic flow computer simulations of the Macondo well flow for the time frame beginning with the displacement of the drilling mud, about 4 p.m., up to the surface blowout that occurred near 10 p.m.51 Input pump rates were calculated from the real time pump stroke rate with a pump volumetric efficiency (91%) that gave the best match for measured drill pipe pressures and returns flow rate. Pressure drop was calculated using the Bingham plastic/Moody turbulent models, viscosities being selected to maximize a match with the measured pressures. There is considerable uncertainty in such calculations, particularly the two-phase pressure drop and at the high Macondo flow rates as the oil and gas neared the surface. Other uncertainties are mixing effects of the various fluids and the wellbore fluid temperatures versus time. To align with the real time data, the simulation scenario

47 The BP Report has the lower annular being closed at this time, based on witness statements about indicator lights in the surface remote control panel. After that report was prepared, examination of the BOP presented evidence proving near certainty that the upper annular was closed. The inconsistency with the witness statement is unexplained. 48 Transocean Report, Vol.1: 153, 155, and other reports conclude that the upper pipe ram was also closed. ES analysis indicates the unlikelihood that the crew closed it, but rather it closed itself later in the incident, as discussed later in this report. 49 BP Report, 29. 50 ‘deadman’ is defined by API Specification 16D: a BOP safety system that is designed to automatically close the wellbore in the event of a simultaneous absence of hydraulic supply and signal transmission capacity in both subsea control pods. (5.9.3). AMF (Automatic Mode Function) is Cameron’s version of a deadman system. 51 ES Report, “Well Flow and BOP Ram Computer Simulations,” April 2, 2013.

CSB-FINAL REPORT-BOP(06-02-2014)

Page 13 of 83

U.S. Chemical Safety Board By Engineering Services, L.P. presented assumes that the wiper plug failed, as discussed earlier. Therefore, while the results were calibrated to real time measured properties, there may be other solutions that also match the real data. The ES model was used to explore different scenarios in the wellbore to help arrive at the opinions in this report. The computer program was also used to calculate information and figures for the incident sequence descriptions that follow next in this report. 4 Incident Progression: Initial Fluid Displacement for the Negative Pressure Test Displace mud with spacer fluid and water Referring to Figure 3, at 3:56 p.m., pumping began with 421 bbls52 of a 16 ppg spacer fluid down the drill pipe, taking fluid returns from the marine riser at the surface. This spacer was special lost-circulation fluid left over from the drilling phase and had a high effective viscosity.53

3:56 p.m. 4:12 p.m. start pumping spacer at bottom of drill pipe Figure 3: Initial displacement

52 TO Report Appendix G, 56. 53 BP Report, Appendix W, Section 1.6, states that the spacer fluid was pumped into the well so that it could be legally disposed overboard instead of being shipped back to shore for disposal, per EPA permit criteria.

CSB-FINAL REPORT-BOP(06-02-2014)

Page 14 of 83

U.S. Chemical Safety Board By Engineering Services, L.P. After the spacer, 30 bbls of fresh water tank wash54 (ES interpretation) and 285 bbls of sea water were pumped into the drill pipe. The intention was to displace all of the spacer above the BOP, but with the fluid leak out of the wellbore discussed earlier, a substantial portion remained below the BOP, extending about 2,000' below, as depicted in Figure 4. The ES simulation indicates that 65 bbls of fluid were lost from the wellbore prior to the negative pressure test.

4:30 p.m. 4:52 p.m 4:54 p.m. start pumping sea water end of pumping annular BOP closed;

riser level down 19 ft. Figure 4: Pumping sea water for the negative test; a downhole fluid loss should result in riser level drop after pumping is stopped. 5 Incident Progression: Negative Pressure Test After the pumps were stopped, the drill pipe had about 2,300 psig U-tube pressure, as shown in Figure 5. This pressure is the result of the drill pipe, full of water, having a lower hydrostatic pressure than the annulus, which had both water and dense spacer fluid, its height elongated to a length of about 1,500 feet by the small casing/drill pipe annulus However, the pressure should have been only about 1,600 psi, the amount that should have occurred with all of the spacer above the closed BOP.55 The high pressure indicated that something had not gone properly with the

54 ES concludes from its simulations that a planned 30 bbl. fresh water spacer likely was pumped as a tank wash after the spacer. Reference BP Report Appendix Q pg. 2 and Transocean Report, Appendix G (page 57) for additional discussions of this item 55 Planned U-tube pressure: riser annulus 14.2 mud to 3746 feet (= 2766 psi) then 421 bbls of 16 ppg spacer to BOP @ 5001 ft. (= 1045 psi) less 5001 feet of seawater in DP (= 2223 psi) = 1587 psi. (Below 5001 ft, both DP and annulus to have sea water)

CSB-FINAL REPORT-BOP(06-02-2014)

Page 15 of 83

U.S. Chemical Safety Board By Engineering Services, L.P. displacement, and that much of the dense spacer fluid was still below the BOP. ES could find no expected pressure in a procedure that the crew could have compared to the actual value as an indicator. After about two minutes, an annular preventer (probably the lower annular56) was closed to isolate the well from the riser fluid hydrostatic pressure. The real time drill pipe pressure started dropping, which indicates a leak bleeding off the pressure somewhere. ES found no evidence that the crew was aware of this indicator.

Figure 5: Drill pipe pressures during negative pressure test In this negative pressure test, reducing the surface pressure to zero should have caused the bottom hole hydrostatic pressure to fall to about 1,000 psi less than the reservoir pressure outside the casing.57 If the well were sealed, the drill pipe pressure should have been zero after bleeding the pressure. It was not. The crew first bled some fluid from the drill pipe, in two steps, reducing the drill pipe pressure to 273 psig while bleeding, but then rose to 1250 psig in six minutes. The crew noticed that the riser was not full and judged that the annular was leaking riser fluid and pressure down into the well keeping the drill pipe pressure up. However, that judgment was not unanimous.58

56 Witnesses at JIT hearings gave contradictory recollections. On May 27, 2010, Jimmy Harrell recalled the annual preventer was the upper one. On May 28, Chris Pleasant said it was the lower one, and on August 25, Mark Hay also said it was the lower. Mark Hay closed the preventer, and Chris Pleasant readjusted its setting later. 57 Hydrostatic pressure calculations were 8,367' of 8.55 ppg sea water plus 14 ppg mud to total depth of 18,304 ft = 10,954 psig; 14 ppg mud only to total depth = 13,325 psig. For a 12.6 ppg reservoir at total depth, the reservoir pressure is 11,992 psi. The difference is 1,039 psi. 58 JIT hearing, May 28, 2010 (26:30): Witness Christopher Pleasant, Transocean DWH subsea supervisor, recalled that Bob Kaluza (BP wellsite leader) spoke to the Jason Alexander (TO driller): “We didn’t lose no mud through the annular.’ He say it U-tubed. Where it U-tubed to, I don’t know.” (1:26:19): Christopher repeated essentially the same recollection.

CSB-FINAL REPORT-BOP(06-02-2014)

Page 16 of 83

U.S. Chemical Safety Board By Engineering Services, L.P. The crew increased the closing pressure of the annular from 1,500 psig to 1,900 psig to improve the seal. The riser was refilled with an estimated 20-25 bbls of mud (value not certain)59 and stayed full, which the crew interpreted as success in correcting a leak.60 The ES simulation indicates that there is another reasonable explanation.61 Losses through a failed wiper plug or casing, as discussed earlier, likely continued after pumping stopped. If so, as discussed earlier, the fluid level in the riser should drop during the two minutes between pump shutdown and annular closure. ES simulations calculate a loss of 5-15 bbls. This suggests that the observed riser loss may not have been due to an annular leak but rather that the riser loss had already occurred before it was closed. There is no evidence that any crew member checked the riser level before closing the annular (a common practice with at least one operator,62 but not a documented industry standard). A low level would have indicated a casing, riser, or other leak, which could be diagnosed and lead to remedial steps instead of proceeding with the negative pressure test. After refilling the riser, the crew returned to bleeding, as depicted in Figure 6.

5:05 p.m. 5:30 p.m. 6:00 p.m.

Bled 14 bbl in 2 steps (DP) Bled 15 bbl (DP) Bled 14 bbl (kill line)

Oil entering the well More oil in the well Figure 6: Bleed fluid steps during negative pressure test (simulation)

59 Chief Counsel Report, 155. 60 BP Report, 24. 61 The concept was originally publicized by Phillip Rae, industry commenter, in December 2010 in “Deepwater Horizon Macondo Blowout - Analysis of Negative Pressure Test Anomalies.” It suggests the loss was due to casing shoe/wiper plug failure. //calmap.gisc.berkeley.edu/dwh_doc_link/Processed_files/Macondo_Well_failure_analyses/DeepWater_HorizonBlowout Analysis_of_Negative_Test_Anomalies_December2010-_Phil_Rae_Final_Report.pdf. 62 ExxonMobil, personal communication with the author of this report.

CSB-FINAL REPORT-BOP(06-02-2014)

Page 17 of 83

U.S. Chemical Safety Board By Engineering Services, L.P. The supervisors discussed the results thus far, and a BP well site leader decided to change the procedure to test on the kill line, a relatively small diameter pipe that connects to the well directly at the BOP. This decision was based, at least in part, on the kill line being the test point mentioned in the MMS permit.63 Starting 5:52 p.m., the crew bled 3-15 bbls of sea water from the kill line over several minutes. Drill pipe pressure fell to about 200 psi. A witness reported continuous flow from the kill line that spurted and was still flowing when instructions were given to shut in the line.64 Meanwhile, the drill pipe pressure gradually rose to 1,400 psig and leveled off by 6:35 p.m. After discussion, the crew pumped sea water into the kill line to ensure it was full. Upon reopening, the crew bled only 0.2 bbl pressure followed by no flow for about 30 minutes.65 Discussions ensued concerning the 1,400 psig on the drill pipe versus the lack of pressure or flow on the kill line. At 7:55 p.m., the decision was that the test succeeded and that the production casing was sound.66 This ultimately proved to be an erroneous judgment. Dense spacer remaining below the BOP from the under-displacement would have increased the annular hydrostatic pressure, substantially reducing the surface kill line pressure and adversely affecting the test interpretation. Also, some of the viscous spacer had moved into the kill line during its bleed. Several reports note that this viscous, gelling fluid might have clogged the kill line.67,68 The ES simulation indicates that there were about 600 feet of the spacer in the kill line. The simulation calculated about 800 psig of pressure, which could be plausibly blocked by thickened spacer. The mud company (M-I SWACO) had earlier advised BP that this spacer had a risk of congealing in “small restrictions.”69 The absence of final kill line pressure and flow was the basis of the crew’s erroneous judgment of success. Overall between 5:08 p.m. and 7:55 p.m., the crew bled a total of 33 to 55 bbls70 from the well (simulation gives 41 bbls.), including perhaps 25 bbls that the crew had attributed to the annular leaking riser mud.71 These volumes are substantially greater than the 3.7 bbls fluid compressibility would explain,72 likely meaning that some external fluid had entered the well. The crew did not behave as they were aware that the total bleed volume was much too high.

63 National Commission Report, 107-108. 64 BP Report, 25. 65 Ibid 66 Ibid 67 National Commission Report, note 82, 324. Chief Counsel Report, 151 The GC Report also noted that this material had never been tested for this application, that there was no operational reason to use this spacer, and that it was pumped into the well to exploit an EPA RCRA provision to avoid shore disposal costs. BP Report, 40. Transocean Report, 99. 68 BP Report, Appendix Q, 3: concluded “Solids from the spacer could have plugged the kill line, or the viscosity or gel strength of the spacer could have been too high to allow pressure to be transmitted through the kill line. 69 Chief Counsel’s Report, 151. 70 Range of volumes come from different sources, both reported and computer simulation. 71 The riser fill volume is not accurately known, with wide range from various accounts. Chief Counsel’s Report, 152. 72 BP Report, Appendix R: 1.

CSB-FINAL REPORT-BOP(06-02-2014)

Page 18 of 83

U.S. Chemical Safety Board By Engineering Services, L.P. 6 Incident Progression: Final Displacement and Initial Oil Flow Starts

8:01 p.m. 8:04 p.m.

Open BOP; riser level drop Resume pumping; losses from casing continue

Some influx oil pushed back out shoe. Figure 7: Continue displacement; losses continue At 8:00 pm., not having recognized the failed negative pressure test, the upper annular was reopened. This operation increased the hydrostatic pressure from mud in the riser and caused the pressure at the bottom of the well to increase. The well became over-balanced, the flow of reservoir oil into the wellbore stopped, and likely caused some of the influx oil to start moving slowly back into the formation.

CSB-FINAL REPORT-BOP(06-02-2014)

Page 19 of 83

U.S. Chemical Safety Board By Engineering Services, L.P.

8:17 – 8:26 p.m. about 8:51 p.m. 8:57 p.m.

Hole develops in 3½" tubing Well going under-balanced under-balance now 200 psi Figure 8: Continue displacement – calculated results At 8:17 p.m., the drill pipe pump rate was increased to 22 BPM, and 7-8 BPM was added down the boost line (enters the riser just above the BOP). Analysis of real-time drill pipe pressures indicates that the high rate likely caused a washout (leak) to start at or near the top of the 3½" tubing (indicated by the red arrow in Figure 8) and develop into a large hole by 8:25 p.m. This would not have had significant consequence on the displacement, but it could have been a factor later if AMF/deadman failed. Under that scenario, the well flow below the BOP would have been flowing only up inside of the drill pipe. The absence of the 3½-inch section and its pressure drop would have decreased the uplift force, reducing the compression load and support of the drill pipe. This affects the drill pipe buckling analysis of the Autoshear scenario. Sometime about 8:51 pm, ES simulations indicate that enough of the mud in the riser had been replaced with sea water that the well went underbalanced and oil started flowing again slowly into the wellbore.

CSB-FINAL REPORT-BOP(06-02-2014)

Page 20 of 83

U.S. Chemical Safety Board By Engineering Services, L.P. 7 Incident Progression: Oil Flow Increases

9:00 p.m. 9:10 p.m.

Oil influx rate about 3 BPM Oil influx rate about 9 BPM Figure 9: Reservoir flow increases during final displacement As the spacer was expected to reach the surface at 9:08 p.m., the pumps were stopped for a spacer ‘sheen’ test to determine if there was oil content that would cause a sheen upon discharge into the sea. ES calculates that the surface pit volume had increased by about 60 bbls over the previous 16 minutes. Normally, a pit volume increase alarm is set by the crew to help them in kick detection. Often it can be set at about 10 bbls73, but higher value can be appropriate (to avoid false alarms) if rig motion is causing variations). However, the Macondo pit volume measurement during the temporary abandonment operations was frequently rapidly changing due to other operations,74 so it is likely that this changing pit volume display was preventing effective use of the alarm feature. The flow meter on returns showed an increase several minutes earlier, but would have been partly masked by pump rate changes. Upon stopping the pumps, the returns were switched overboard into the sea at 9:09 p.m., bypassing the real time returns flow meter, so no returns rate data exists for post-incident analysis. However, a second returns flow meter remained available to the crew, but they did not detect the increasing discrepancy in returns flow that must have occurred as the reservoir flow accelerated.75

73 Standard Handbook of Petroleum and Natural Gas Engineering: Volume 1, 1060 74 BP Report, 92-98. 75 Chief Counsel’s report, pg. 170

CSB-FINAL REPORT-BOP(06-02-2014)

Page 21 of 83

U.S. Chemical Safety Board By Engineering Services, L.P.

9:31 p.m. ~9:43 p.m 9:47 p.m. pumping stopped; driller discussion actuate annular; no seal VBR is closed and seals Figure 10 – Reservoir flow increases and goes above the BOP; VBR closed Pumping had resumed while the unrecognized well flow accelerated. Referring to Figure 10, at 9:31 p.m., pumps were stopped when the driller and toolpusher discussed “differential pressure.”76 At this time, the top of flow was near the end of the circulating string and flowing at a calculated 22 BPM and accelerating. About 9:43 p.m., they initiated well control actions and actuated the upper annular; gas and oil were at or above the BOP. Because detection was so late, the well was essentially full of oil and gas and flowing at a high rate. As a result, the pressures that would face the BOP system were high, but still within its pressure ratings (15,000 psi for the VBRs and BSR, 10,000 psi for the annulars).77 Flow rate was a different matter. While BOP equipment is not specifically designed to any specific flowing rate, it is common successful industry practice to shut-in a flowing well kicks, and the BOP is relied upon for that purpose. The rates that occur during these experiences are not publicized, but are usually below 10 BPM78, much less than the rates that existed these BOP operations. At 9:47 p.m., the crew closed a VBR, which did stop the flow at the BOP.79 However, oil and gas were already above the BOP and were rising from buoyant migration, gas release from the oil, and gas expansion from decreasing hydrostatic pressure.

76 BP report, pg. 27; National Commission report, pg. 112; Chief Counsel’s report, pg. 315 note 199, Transocean Report, pg. 128 77 BP report, Appendix H, 227, 230. The lower annular stripping packer was rated to hold 5,000 psi across the packer, and 10,000 psi within its body (e.g,, if the upper annular were sealed). The report describes that the lower annular was not used during the incident, so the packer rating of 5,000 psi is not relevant to the BOP failure. 78 Author’s understanding from personal experiences. 79 As indicated by the rapid increase in drill pipe pressure plus the DNV examination that found the Middle VBR closed when examined at Michoud. (DNV report, 27). Closure by the crew is the only possible mechanism that has been identified.

CSB-FINAL REPORT-BOP(06-02-2014)

Page 22 of 83

U.S. Chemical Safety Board By Engineering Services, L.P. 8 Failure of the Upper Annular and Sealing by a VBR Transocean’s customary response to a flowing well (well kick) with drill pipe in the hole is to actuate an annular preventer, preferably the upper.80 Witness accounts said that the bridge remote control panel indicated that the lower annular (LA) was closed.81 However, upon DNV examination at Michoud, the LA was found open and the upper annular closed.82 Based on simulation matching with the real time data, ES believes that the upper annular (UA) was actuated at 9:43 p.m., but it did not seal.83 If it had sealed, the drill pipe pressure at the surface would have rapidly increased to 5000+ psig (as it did when a VBR sealed a short time later at 9:47 p.m.). Rather the drill pipe pressure fluctuated between 1,800 and 400 psig in this period.84 Failure of the Upper Annular The upper annular failed to seal against the high flow rate encountered at Macondo. While closing, the flow rate through the upper annular was calculated to be about 35 BPM (bbls/minute).85 After closing, the calculated flow rate through the annular reduced by only a small amount to 20-25 BPM. ES attributes the annular failure to high-velocity flow within the annular, eroding the sealing rubber and possibly some of the drill pipe to create a flow path. It should also be recognized that annulars can usually seal with some flow, as proven by years of various industry experience. VBR Actuation and temporary successful sealing of the well ES believes that the crew closed at least one VBR at 9:47 p.m., and that it sealed the well, holding a pressure of about 9,000 psia (about 8,000 psi differential).86 While the VBR has a roughly similar metal fingered and sealing rubber design as the annular, it successfully sealed the well about 4 minutes later, when the flow rate was about the same. ES hypothesizes that the faster closing rate of the VBR helped give it a higher flow rate capability. During ensuing weeks of the blowout, the VBR lost its annular seal, likely due to its rubber sealing element failing due to extended high temperature. The temperature inside the BOP during these weeks was estimated by BP to be 180-220ºF.87 The Cameron rated operating range is 70-180ºF.88 While there must also be limits to the VBR ability to seal on high flow, this experience also demonstrates that a VBR can have higher high-flow capability than an annular.

80 Transocean Well Control Handbook 5.3.3 81 DNV Report, Vol. 2, F-102. 82 Ibid, Vol. 1, 27 83 To obtain a match with real time data, the annular had to be moved to 95% closed starting at 9:43 pm. (95% reflecting the deduced leak condition). The upper annular was found closed at Michoud, and the lower found open. See Appendix C, Condition of BOP as found 84 BP Report, Appendix Z, Figure 1. 85 ES simulation (volume rate in the BOP). 86 ES calculation using real time drill pipe pressure adjusted for water in the drill pipe and riser fluid density from simulation. 87 Flow Rates from the Macondo MC252 Well by Dr. R. C. Dykhuizen, Sandia Labs; 7 TREX-001452 88 Cameron bulletin 833D, 8/21/2006

CSB-FINAL REPORT-BOP(06-02-2014)

Page 23 of 83

U.S. Chemical Safety Board By Engineering Services, L.P. 9 Incident Progression: Riser Unloading and the Explosion At 9:40 pm, water and mud were coming up through the rotary table spilling onto the rig floor. ES estimates that by 9:47pm, when a VBR sealed the well at the BOP, the riser was 10-20 percent filled with oil and evolving gas, possibly much more. Eventually, Mud and water shot up through the derrick. After gas surfaced, the flow would surge and belch as gas bubbles surfaced, but would have decreased as the riser gas became exhausted, within 10-20 minutes.89 The source of oil and gas had been stopped by the closed VBR. The initial gas release rates were likely in the 100-400 mmcf/day range for 7-8 minutes.90 The rate and duration dispersed the gas to ignition sources in sufficient concentrations for the initial explosions to occur. At 9:56 p.m., the EDS (Emergency Disconnect System) button was pushed on the bridge and should have closed the BSR and disconnected the riser.91 However, there was no indication of actuation, e.g., riser disconnecting, and the low accumulator alarm was sounding, indicating loss of surface hydraulic power. It is likely that MUX communication was also lost in the initial explosion.92 These events would have satisfied the criteria for automatic activation of the AMF/deadman backup system within 1-2 minutes of their loss, i.e., before 9:58 p.m. 10 BSR Failure to Seal With its triggering conditions met, the AMF/deadman system is designed to automatically close the BSR. Despite likely actuation of the AMF/deadman at Macondo, the BSR was unable to fully close and seal the well. The DNV forensic analysis revealed that when the BSR activated, the drill pipe was positioned off-center near the inside wall of the BOP, partly outside of the range of the BSR cutting blades.93

89 BP Report, Appendix W, 56; Figure 3.35 shows calculated pressure above BOP fell from 2500 psi to 800 psia in ten minutes, and to 100 psia in another 10 minutes. 90 BP report, Appendix V, pg. ii, Figure ES-1 91 Chief Counsel’s report, pg. 198. 92 Ibid. 93 DNV report, 53-56, 100

CSB-FINAL REPORT-BOP(06-02-2014)

Page 24 of 83

U.S. Chemical Safety Board By Engineering Services, L.P. The BSR was equipped with the model SBR shearing packer.94 The SBR is designed to center an off-center pipe by means of an angled blade, as shown in Figure 11. As the rams move inward, the V-shape tries to center the pipe.

Figure 11: Cameron SBR – single V blade design95 Cameron engineers have stated Cameron had no test data of shearing pipe restrained against a BOP wall.96,97 ES could find no reports of off-center pipe having ever caused a malfunction. However, the DWH incident revealed a scenario that could create a firmly off-center situation. The drill pipe moved off-center when it buckled. Buckling can be caused by compressive force from (1) friction of the well fluids moving up past the drill pipe walls in the wellbore (drag forces) plus well fluid pressure pushing on the pipe bottom end, or (2) gravity force of the pipe weight above the BOP. Further, pipe buckling is influenced by pressure, with internal pressure adding to the buckling load. In fact, pipe can buckle with little axial compression force, or even in tension, when combined with high differential pressure (inside pressure higher than outside). A high differential pressure condition developed on the DWH after the VBR was closed (real time drill pipe pressure rose to over 5850 psig, which corresponds to over 6,800 psi of differential pressure at the BOP).

94 ES visually confirmed at Michoud that the DWH blade model was an SBR type. This is the model originally provided with the BOP by Cameron. Cameron. Deepwater Horizon TL BOP Stack Operation and Maintenance Manual, CAM-CSB 000005921, September 2000, 3-38. 95 Cameron Engineering Bulletin EB 852D Rev. A1 (Oct. 1998), “Shear Ram Product Line”: 1. 96 David McWhorter at DNV public hearing on the DNV Report, April 4-7, 2011 97 Deposition of Melvin Whitby, July 18, 2011, 42

CSB-FINAL REPORT-BOP(06-02-2014)

Page 25 of 83

U.S. Chemical Safety Board By Engineering Services, L.P. 11 Pipe Buckling at the Macondo Well – Effective Compression A differential pressure effect to promote pipe buckling is a consequence of fluid mechanics and physics, well documented in published professional engineering society papers.98 The phenomenon is also included in a DNV offshore code for submarine pipelines.99 Internal pressure does not create compressive force in the conventional sense, but rather creates bending moments that lead to buckling just as actual compression force can. As a result, higher internal pressure increases the buckling tendency of a pipe. An engineering parameter for this effect can be calculated and is termed effective compression.100 Differential pressure should be considered in assessing the amount of drill pipe deflection in the Deepwater Horizon BOP. As will be discussed next, axial forces alone were likely insufficient to buckle the pipe at any time until the vessel sank. Furthermore, and while perhaps not immediately obvious, an analysis of effective compression experienced by the drill pipe addresses the DNV recommendation to further study conditions leading to pipe buckling.101 The recommendation is important because as the effective compression analysis presented here demonstrates, pipe buckling conditions can exist even if timely well control actions initially shut in a well. The potential for drill pipe to buckle within the BSR during a shut-in well situation reveals previously unrecognized, credible scenarios in which a BSR could fail to seal.

98 A. Lubinski, W.S.Althouse, and J.L. Logan, Helical Buckling of Tubing Sealed in Packers, JPT (1962); A.J. Chesney Jr. and Juan Garcia, Load and Stability Analysis of Tubular Strings, 69-PET-15, ASME Petroleum Mechanical Engineering Conference, Tulsa, OK (1969); Stan A. Christman, Casing Stresses Caused by Buckling of Concentric Pipes, SPE 6059 (1976); R.F. Mitchell, Fluid Momentum Balance Defines the Effective Force, SPE/IADC 119954 (2009); R.F. Mitchell, Casing Design with Flowing Fluids, SPE/IADC 139829 (2011); A.C. Palmer, J.A.S. Baldry, Lateral Buckling of Axially Constrained Pipelines. University of Cambridge, JPT (1974); C.P, Sparks, “The Influence of Tension, Pressure and Weight on Pipe and Riser Deformations and Stresses,” Journal of Energy Resources Technology, ASME, (1980); Charles Sparks, “Effective Tension in Pipes and Risers: A Bold but Simple Concept World Oil, December 2012. 99 Submarine Pipeline Systems, DNV-OS-F101 Standard (2010), Section 4 G 300, 40. 100 Stress Engineering Services (SES), serving under contract from Transocean, did suggest effective compression to explain the pipe buckling. [Transocean, 2011, Appendix M] However, Transocean did not use the SES explanation in their investigation report. The National Academy of Engineering report notes the differences between the results of Transocean and of their contractor SES, but NAE does not acknowledge that SES is presenting effective compression values which include the effects of a pressure differential between the inside and outside of the pipe and accounts for the weight of the drill string and buoyancy forces [see NAE 2011, page 50]. 101 DNV Report, “Supplement the Finite Element Analysis buckling model with a Computational Fluid Dynamic simulation of the flow through the drill pipe”: 8.

CSB-FINAL REPORT-BOP(06-02-2014)

Page 26 of 83

U.S. Chemical Safety Board By Engineering Services, L.P. Pipe buckling equations Various mathematical techniques have been used to derive the equation for the combined effects of axial compression force and differential pressure on pipe buckling. The following formula calculates the effective compression as the sum of the axial force compression and the differential pressure effect terms.102,103 The formula to consider pressure in buckling is simple in its form:104 Fs = Fa + Pi Ai – Po Ao (3)

where Fs = effective compression Fa = axial tension (+ compression, – tension) Pi , Po = internal and external pressures, respectively Ai, Ao = inside and outside cross-section areas, respectively If Fs > Fcritical, the pipe will be unstable and buckle. where Fcritical is the calculated Euler buckling load for the pipe. Fcritical = π2 E I / (k L)2 (4)

k = 1.0 for pinned ends, 0.7 for one pinned and one fixed (rigidly clamped) end, 0.5 for fixed ends 5½" 21.9 ppf pipe, ID = 4.78" I = π (OD4 - ID4) / 64; E = 29,000,000 psi For 1 pinned and 1 fixed end and both UPR and MPR closed:105 L = 27.1 ft. from bottom of upper annular to top of upper VBR

Fcritical = 106,556 lbs. For only MPR closed (it still acts as nearly fixed end due to influence of casing ID below the BOP) L = 31.2 ft. from bottom of UA to top of middle VBR

Fcritical = 80,391 lbs. The two values of Fcritical show that the assumption of whether the upper VBR was closed by the crew (or later by some other mechanism) has a significant effect. This question will be explored later in the report.

102, Chesney, A.J. and Garcia, Juan, Load and Stability Analysis of Tubular Strings, 69-PET-15, ASME Petroleum Mechanical Engineering Conference, Tulsa, OK (1969) 103 Christman , Stan A., Casing Stresses Caused by Buckling of Concentric Pipes, SPE 6059 (1976) 104 Ibid with signs changed to reflect effective compression instead of stability load (effective tension) 105 ES treated the UA as a ‘pinned end’ for two reasons. Its rubber that laterally restrains the drill pipe is deformable and will allow the drill pipe to rotate vertically in response to the buckling bending moments. Second, the mechanism squeezing this rubber had lost most of its force due to the absence of closing pressure at the time of BSR operation (control system was de- energized). A ‘fixed end’ requires a fully rigid connection. ES believes the result is that the UA behaved as a pinned connection.

CSB-FINAL REPORT-BOP(06-02-2014)

Page 27 of 83

U.S. Chemical Safety Board By Engineering Services, L.P. The formulas are for a uniform diameter pipe. To consider the effect of tool joints, both DNV and CSB had finite element computer analyses (FEA) made. DNV used an ABAQUS computer model with axial compressive force,106 while the CSB model used the ANSYS model with internal pressure as the primary loading mechanism.107 A comparison of the maximum deflection with load is shown in Figure 12 along with the Euler formula value. All three methods give a similar value of the critical effective compression. This shows that the tool joint has a small effect; DNV values were 110,000 to 113,568 lbs., and the CSB model with 108,000 to 114,000 lbs. Both computer models revealed that the buckling deformation develops rapidly over a small increase above the critical load, as shown in the figure.

Figure 12: Comparison of CSB and DNV FEA calculations108,109 FEA models with a tool joint give slightly higher buckling load than Euler equation

106 DNV Report, 151, 153. 107A tool joint was placed at the UA. For the CSB ANSYS model, an axial force tension of 10,000 lbs. was set while internal pressure was increased to 7000 psia. 108 CSB ANSYS report Task 4 “Nonlinear Buckling Model Drill Pipe Under Internal Pressure” Engineering Services Deepwater horizon.pptx, May, 2012 109 DNV report, 153

CSB-FINAL REPORT-BOP(06-02-2014)

Page 28 of 83

U.S. Chemical Safety Board By Engineering Services, L.P. Shape of the buckled drill pipe and implications on which VBRs were closed by the crew FEA analysis can also determine the shape of the bow for a buckled pipe, which was helpful in assessing if the crew also closed the upper VBR pipe ram (UPR), as concluded by DNV because it was found in the closed position.110 Figure 13 shows the drill pipe bow shape assuming that both VBRs were closed.

Figure 13: CSB FEA calculation for both UPR and MPR closed.111 As pointed by the red arrows, the FEA deflection opposite the BSR is about 3.5 inches, while the deflection determined from the DNV laser scan images from Michoud is greater, 5.5 inches. See Figure 14.

Figure 14: Drill pipe off-center distance from DNV laser scans of DP and BSR block112 An alternative case is that the upper VBR did not center the drill pipe. An FEA buckling case was run assuming that the pipe deflection opposite the Upper VBR (UPR) was not less than 1.2 inches.

110 Ibid., 5 111 CSB ANSYS report Task 4A “Nonlinear Buckling Model Drill Pipe Under Internal Pressure” Engineering Services Deepwater horizon.pptx, May, 2012 112 DNV Report: 100; 5.5" + 2.75" (DP radius) = 8.25"; 18.75" nom.BOP = 18.882"/2= 9.441" radius; thus drill pipe was ~1.2" from BOP wall (9.441-8.25).

CSB-FINAL REPORT-BOP(06-02-2014)

Page 29 of 83

U.S. Chemical Safety Board By Engineering Services, L.P.

Figure 15: Assuming only MPR was closed – FEA closely matches actual drill pipe off-center location In Figure 15, the green line shows this pipe shape and is compared to one for both VBRs fully closed (red line). The blue arrows point to the 1.2 inch off-center displacement opposite the UPR versus zero displacement for the both rams fully closed. The ‘only MPR fully closed’ line has a 5 inch deflection (at green arrow), slightly less than the examination value and a much better match than 3.2 inches (red arrow) for both VBRs closed. After the drill pipe was sheared, the upper VBR could center the pipe and fully close. As discussed earlier, during the following weeks, ES believes that the rubber in both VBRs failed from extended high temperature. Weeks of flow through the leaking VBRs created similar erosion patterns on the drill pipe opposite the upper and middle VBRs.113 Thus, ES believes that only the MPR was closed by the crew and at the time of BSR actuation the UPR was not fully closed. This scenario raises the question of how the UPR ST locks got set, as they were found by the DNV examination.114 The explanation comes from the nature of the VBR operating pistons. After the explosion and BOP control system power was lost, both the opening and closing piston areas were vented to the sea floor water pressure. The design has a connecting rod that is exposed sea water pressure on its external side and well pressure on the internal side. Once power was lost, a moderate closing force would have developed due to the pressure difference between the external sea water pressure (2200 psig) and a lower BOP bore pressure (hydrostatic head of oil and gas that essentially filled the riser, assumed between 1000 and 1700 psig). This force, after the explosion, would push UPR inward until it met the resistance of the already buckled drill pipe. The resistance force came out of the FEA analysis, 4090 lbs. for 1.0 inch deflection, and 1300 lbs. for 1.2 inch deflection.115 As detailed in Appendix D. - VBR Closing Force Calculations on the Bowed Drill Pipe, the calculated equilibrium deflection ranges from 0.86 to 1.15 inches, depending on assumed BOP pressure (1000-1700 psig) and on steel-

113 DNV report, ‘Damage on Drill Pipe Segment in Variable Bore Rams’, 108-109 114 DNV report, 4, 61-73 115 Deepwater Horizon BOP Analysis - Task 4B-3 (4B-2 Addendum): Nonlinear Buckling Model Drill Pipe Under Internal Pressure, Nov. 2012; charts 12, 13

CSB-FINAL REPORT-BOP(06-02-2014)

Page 30 of 83

U.S. Chemical Safety Board By Engineering Services, L.P. on-steel friction factor (0.2-0.3) between the EAP fingers as they move past each other. The modeling assumed that the BOP packer rubber offered no resistance to EAP finger rotation; it must have to some degree, making the calculated deflection numbers somewhat low. However, the pipe could not have been deflected by more than 1.3 inches due to the design of the ram block, which inherently has a much higher centering force up to that value. ES concludes that drill pipe was centered at the middle VBR (not the upper VBR) and at the upper annular. Lower critical buckling load: An important consequence of this result is that the Macondo critical buckling load was less than it would have been with the both rams fully closed. From FEA analysis, the critical effective compression load was about 75,000 lbs., not 110,000 lbs. Buckling loads after the VBR closes and seals Table 1 summarizes the calculated effective compression loads for various time conditions and whether the load should have been sufficient to buckle the drill pipe, using 75,000 lbs. as the critical load in the BOP. Case & time Description DP Pressure at BOP DP Axial Force at BOP, lbs. Pressure component, lbs. Effective Compression, Fs, lbs. Buckled in BOP? 1 ~9:47 p.m. Just before VBR seals; buckling starts above BOP @DP surface pressure = 1700 psig; ~30 BPM flow rate up annulus 3940 psia -35,800 tension 42,100 6,400 In riser, not in BOP 2A 9:48 p.m. Possible initial buckling in BOP @DP surface pressure = 4600 psig 6850 psia -18,000 tension 93,300 75,300 Maybe 2B 9:49 p.m. Likely progression of buckling; @DP surface pressure = 5700 psig 7940 psia -12,500 tension 113,900 101,300 Yes 2C 9:49+ p.m. @time of explosion; DP surface pressure = 5850 psig 8090 psia -11,600 tension 116,600 104,900 Yes Table 1: Buckling of drill pipe in the BOP – well not flowing Assumed BOP pressure = 1200 psia. Flow rates, axial forces and pressures were developed from ES dynamic flow simulation model.116,117 Case 1 establishes the initial axial tension in the drill pipe, reduced from its free hanging pipe tension in the BOP of about 59 kips (buoyant in oil) to 35.8 kips by both flow drag forces and pressure uplift effects. The drill pipe is being primarily supported by the rig from the surface, or else the drill pipe would have dropped to land a tool joint on the closed VBR; this is not possible given the condition of the drill pipe as found. Case 2A shows that drill pipe buckling in the BOP may have initiated at 9:48 p.m. when the drill pipe surface pressure reached 4,600 psig.

116 A flow model uses fluid friction to calculate both the pressure drop and the drag forces on a pipe. Pressure acts on horizontal pipe areas to create force, and the wall drag adds force provide the total axial force in the pipe at the BSR. This force is combined with the pressure differential to determine the effective tension [Equation 3]. 117 These flow rates were calculated using assumptions of fluid viscosity, reservoir properties, and a particular fluid pressure model to obtain an approximate fit with real time data. It is likely than other sets of assumptions could also obtain an approximated data fit. After the blind shear ram closed, the well flow path greatly changed, and the rates and assumed properties in this report should not be used to infer subsequent flow rates or reservoir properties.

CSB-FINAL REPORT-BOP(06-02-2014)

Page 31 of 83

U.S. Chemical Safety Board By Engineering Services, L.P. Case 2B shows that buckling in the BOP almost certainly should have developed by 9:49 p.m. when the drill pipe surface pressure reached 5,700 psig. Case 2C At time of explosion, the drill pipe should have been buckled. Buckling can be elastic (deformation not permanent) or inelastic, even causing pipe damage, if the conditions are severe enough to stress the pipe above its metallurgical yield stress. The calculated pipe stress from the buckle is about 18 ksi. Combining this with the hoop stress (<50 ksi118) and tension stress (2 ksi), the pipe is well below its yield stress of 165 ksi. So the deformation is elastic, meaning the pipe returns to its original shape when loads are removed. The above cases apply to the time from the explosion through the time of expected AMF deadman actuation. As discussed elsewhere, ES considers it more likely than not that the AMF deadman closed the BSR. If the AMF did not function, it is certain that the ROV intervention would have closed the BSR with the autoshear system one-and-a-half days later, at which time the well was clearly flowing. This flow created uplift forces on the drill pipe below the BOP, causing axial compression in the drill pipe. And flow pressure drop above the BOP creates pressure in the drill pipe at the BOP depth. Buckling loads after drill pipe loses pressure integrity At an unknown time after the explosion, pressure integrity of the drill pipe (or its attachments) was lost at the surface, and possibly in the riser, e.g., above the upper annular.119 Regardless, the pressure in the drill pipe at the BOP then would have been driven by the pressure drop above the BOP, in turn governed by the flow rate. First, addressing the scenario with drill pipe flow to the surface, buckling requires a flow rate of 21.5 BPM and requires that only the MPR is closed, and not the UPR (Table 2, Cases 3A to 3D). If the crew also closed the UPR, the flow rate needs to be above 23.5 BPM for the calculations to indicate buckling. The actual flow rate at this time is not known, and a wide range is plausible.

118 ksi = 1000 pounds/square inch 119 The Transocean report concluded that the drill pipe parted just above the upper annular, pg. 31

CSB-FINAL REPORT-BOP(06-02-2014)

Page 32 of 83

U.S. Chemical Safety Board By Engineering Services, L.P.

Case Flow rate BPM DP pressure at BOP, psia DP Axial compressive force @ BOP, lbs.* Pressure component, lbs. Effective compression, Fs, lbs. Buckled in BOP? Drill pipe intact to surface 3A 20 2,300 43,000 13,000 56,000 No 3B 21.5 2,416 60,000 15,000 75,000 Only if UPR is not closed 3C 23 2,584 76,700 17,800 94,500 Only if UPR is not closed 3D 23.5 2,669 85,200 19,400 104,500 Maybe Drill pipe parted above BOP – 4A = high riser pressure/initial break, 4B = low riser pressure 4A 22 1,300 68,800 -5,200 63,600 No 4B 23 275 82,300 -1,600 80,700 Only if UPR is not closed Table 2 – Buckling of drill pipe in the BOP – well flow up drill pipe120,121 Cases 3A to 3D were run with BOP pressure = 1,200 psia hydrostatic, while Cases 4A & 4B have BOP pressure essentially equal to the riser pressure, Case 4A: high riser flow rate, e.g. right after explosion, and Case 4B: low riser flow (22:00) 122 *Axial force calculation considers the fluid flow drag forces as well as buoyant uplift from wellbore pressures (from ES dynamic flow simulation).

Cases 4A and 4B show cases if the drill pipe had parted above the BOP, with two different drill pipe (DP) pressures at the BOP, equaling the riser flowing pressure at the parted pipe. ES calculates a riser flowing pressure of 1300 psi for a flow rate of 22 BPM; as a sensitivity, Case 4B used 275 psia The different flow path would have reduced the effective compression enough to reduce the likelihood of buckling. To summarize, there may have been sufficient effective compression to create buckling at the time of ROV intervention if the BSR was not already closed by the AMF/deadman system. These calculations assume that pipe forces from below the BOP could be transmitted through the closed middle VBR, e.g., no friction. This topic is addressed next. 12 VBR Friction The drill pipe compression force transmitted from below the BOP would have been influenced by friction from the closed middle VBR. Undocumented anecdotal field experiences indicate this friction is low (10,000 to 30,000 lbs),123 but ES could locate no information that would reliably quantify this friction for the conditions that existed during the incident.

120 Flow calculations made with ES computer simulation, with pressure drop correlations from Production Associates computer program PRODENG, version 3.96; Flow correlation: Hagedorn & Brown; Gas-oil ratio correlation: Standing 121 See Table 2 footnote regarding the accuracy and inapplicability to these flow rates to times after the BSR was closed and punctured the drill pipe. 122 Calculation of riser unloading in BP report Appendix W, 56 123 Various personal recollections reported to the author.

CSB-FINAL REPORT-BOP(06-02-2014)

Page 33 of 83

U.S. Chemical Safety Board By Engineering Services, L.P. It is possible to construct a mathematical model of VBR friction, a complex accounting of pressure induced forces, rubber deformation stresses, and friction between steel and rubber elements. The following points would need to be recognized in such a model.

  1. No operating system closing pressure would remain on the VBR. The system closing pressure was lost

due to the explosion severing the BOP communications. The solenoid valves for the closing fluid return to a vent position upon loss of electric energy.

  1. Closing force from pressure difference across the VBR should be considered. The correct pressure

difference is not known, with the largest uncertainty being the pressure below the VBR. ES well flow calculations indicate the pressure was likely between 3,300 and 4,700 psia.

  1. Calculations must use a rubber-on-steel friction factor based on BOP rubber (not natural or tire rubber, for

example) and in an oil-base environment, which likely reduces friction compared to a water environment.

  1. Most important, the complex mathematical model by itself would not be reliable without verification and

calibration with actual VBR friction test data. Manufacturers are equipped to gather actual friction data as part of the API BOP packer stripping life testing, but no such data has been published, as far as ES could determine.124 These reasons make VBR modeling work (without test data) of so little accuracy and reliabilty for the forensic analysis that ES did not complete it. But the VBR friction question raises an important potential learning. If VBR friction could be very high (e.g., 100,000 to 200,000 lbs) under certain credible well kick conditions, it would have a serious, adverse implication for offshore drilling. An important situation occurs when it is decided to hang-off the drill pipe on a closed VBR, which is a well control procedure used by both BP and Transocean,125,126 and likely by most other operators and contractors. If high VBR friction exceeds the weight of the drill string, it would not be possible to lower the drill pipe onto the rams, thus leaving the tool joint potentially opposite a blind shear ram, which is typically not able to shear a tool joint. Regarding the Macondo blowout, high friction would not preclude the drill pipe from being buckled at the time the AMF/deadman should have closed the BSR immediately after the first explosion. The existing axial tension in the drill pipe was sufficiently low for the high differential pressure to buckle the pipe; no additional uplift compression after VBR closure was needed, as shown in the Effective Compression section of this report. 13 Blind Shear Ram Failure When actuated, the blind shear ram (BSR) did shear the drill pipe, but could not develop a seal. The ruptured drill pipe provided a new flow path, bypassing the closed VBR, to feed the riser and the surface fire. Michoud examination revealed evidence that the drill pipe was off-center, near the BOP wall, at the time the BSR was closed. This off-center condition prevented a seal, as will be discussed. Under a phenomenon known as buckling, a pipe can be bowed by high compressive load, and it can fail in bending if it does not contact a lateral support, which the BOP wall provides. The industry had not previously recognized that buckling of a drill pipe in a BOP could occur under certain conditions, forcing the pipe hard off- center.

124 API Standard 16A, 3rd Edition, section 5.7.2.3. calls for tests to move up to 50,000' of pipe through a closed ram under differential pressure. 125 BP Well Control Manual, December 2000, pg. 4-2-13 126 Transocean Well Control Handbook, “Actions Upon Taking a Kick,” Section 5.3 Drilling – subsea BOPs, 1

CSB-FINAL REPORT-BOP(06-02-2014)

Page 34 of 83

U.S. Chemical Safety Board By Engineering Services, L.P. At Macondo, upward forces were developed from below by pressure and flow forces, with a restraint being provided by the tool joint that was up against the closed upper annular.127 These compressive forces, by themselves, were not sufficient to buckle the pipe, based on ES calculation of Macondo pressure and flow at the times of possible BSR actuations. Alternatively, buckling can be caused by weight of drill pipe from above. At Macondo, this may have occurred after the rig support was lost, e.g., by parting of the drill pipe at the surface. This from-above scenario assumes that the AMF/deadman did not already shear the pipe and that the closed VBR(s) could have applied sufficient pipe friction to support the resulting weight. In addition, it is a known physical principle that internal pressure can create and augment the compressive load,128 and this is an important factor in this incident. It is now clear how buckling can happen during a well control operation. This report considers both the “from below” and “from above” scenarios and includes the pressure effect on buckling. Model of shear ram packer: The Cameron BSR has a design feature (Figure 16 shows a V-shape in one of the blades) that tends to center pipe, but it could not handle the high lateral force that buckling created.

Figure 16: Drill pipe off-center in blind shear ram with V-shape blade129 Cameron had not ever tested shearing an off-center pipe.130 API BOP standards are silent on the topic of an off- center pipe and do not provide a design standard, a testing protocol, nor service condition recommendations.131

127 DNV Report, 4 128 See footnote 98 129 Ibid, 15. 130 Cameron testimony by David McWhorter at JIT hearing, New Orleans, April 8, 2011. 131 API Specification 16A Drill Through Equipment, 3rd Edition (2004); API RP 53, Blowout Prevention Equipment Systems for Drilling Wells, 3rd Edition (1997), 4th Edition (2012); API RP 59 Well Control Operations, 2nd Edition (2006).

CSB-FINAL REPORT-BOP(06-02-2014)

Page 35 of 83

U.S. Chemical Safety Board By Engineering Services, L.P.

Figure 17 – Drill pipe positions in blind shear ram: normal and off-centered for Macondo132 Figure 17 illustrates the normal drill pipe centered position during shearing by a blind shear ram (BSR) compared to the off-center position nearly to the edge of the ram as revealed by the Michoud examination. Based on a study using ABACUS FEA (Finite Element Analysis) software, DNV concluded that the BSR was not able to move the entire pipe cross section into the shearing surfaces of the blades.133 As a consequence, the BSR could not fully close and seal. CSB authorized an independent study using ANSYS FEA software whose results support the DNV conclusion.134 The ANSYS study provides some additional images that help describe why the seal could not engage. Figure 18 shows how BSR seals normally work.

Figure 18: BSR full closure engages seals

132 Left: Chief Counsel’s Report, 66; right: DNV Report, 154. 133 DNV Report, 4. 134 ANSYS Deepwater Horizon BOP Analysis – Tasks 2 and 5-2: BSR Model Creation and Shearing Simulation, Dec. 2012. Additional details in Appendix E

CSB-FINAL REPORT-BOP(06-02-2014)

Page 36 of 83

U.S. Chemical Safety Board By Engineering Services, L.P.

Figure 19: Trapped off-center drill pipe prevents ram block faces from fully closing and seal cannot obtain contact Figure 19 (left) shows how the drill pipe near the block edge gets trapped between the flat metal faces (red) of the opposing ram blocks (arrows), preventing full closure. The side rubber seals (green) are not engaged. The right side of the figure shows the internal sealing elements are also not in contact with each other.

CSB-FINAL REPORT-BOP(06-02-2014)

Page 37 of 83

U.S. Chemical Safety Board By Engineering Services, L.P. 14 Results of Drill Pipe Shearing Using the FEA Model The force and closing pressure to shear the 5 ½”drill pipe were calculated with the ANSYS FEA computer simulation (described in the previous section). The base case was shearing the 5½" drill pipe centered and without axial or pressure load to compare to Cameron’s rating of 2,857 psig.135 This pressure corresponds to a closing force of 680 kips (kip = 1,000 lbs.). Drill pipe centered Force, kips Equivalent closing pressure, psig Source To shear Then seal To shear Then seal Cameron 702 D rating* 680 680 2,857 2,857 CSB ANSYS 652 647 2,739 2,720 DNV Abacus136 573 Not reported 2,408 Not reported Table 3 – Shearing and sealing forces and pressures (centered drill pipe)

Table 3 shows that the ANSYS result is slightly below (4%) the Cameron rating, a match ES considers acceptable. The DNV report contained their Abacus computer simulation results, which are 19% below Cameron’s rating. The difference between the two models demonstrate the inherent uncertainty of FEA large deformation modeling and/or the chosen material parameters. With the FEA model calibrated against Cameron data, runs were made for the drill pipe off-center near the BOP wall, Table 4.137 Drill pipe off-center DP pressure, psig DP axial tension, kips Force to shear, kips Force to seal, kips Pressure to shear, psig Closing Pressure to seal, psi No DP loads 0 0 607

1,304

2,550

5,480*

With internal pressure 5800 0 659

1,304*

2,767

5,480*

Add tension 5800 10 585

1,304*

585

5,480*

Table 4: ANSYS FEA shearing and sealing forces and pressures (off-centered drill pipe)

The important result is that the required closing pressure to seal is over 5,480 psig (seals still not engaged at this pressure). The DNV Abacus simulation was taken up to 5,280 psi with essentially the same result.138 The DWH accumulator system supply pressure was limited to 4,000 psi (regulator setting), so it could not possibly have sealed against a drill pipe that was off-center outside of the cutting blades.

135 Cameron Engineering Bulletin EB 702 D Rev B9 Shearing Capabilities of Cameron Shear Rams, January 21, 2008. Operating piston area of 238 sq. in. 136 DNV report, 158 137 The forensic evidence is that the drill pipe was about 1.2" from the wall, largely outside the cutting blade. 138 DNV Report Addendum, 14

CSB-FINAL REPORT-BOP(06-02-2014)

Page 38 of 83

U.S. Chemical Safety Board By Engineering Services, L.P. 15 Blind Shear Ram Capability During Drilling At the time of the incident, the drill pipe size through the BOP was 5½". However, during the most of the prior actual drilling operation with the DWH, the drill pipe size was a larger, stronger 6 5/8", 32 and 40 lb/ft weight from February 6 to April 8, 2011.139 Based on the 2008 Cameron shear rating formulas, the DWH shear ram packer (model SBR) appears to be unreliable for the larger drill pipe, even in a centered position. When the DWH was completed in 2001, its BOP manual, using then-current Cameron ratings, listed the SBR as capable of shearing 6 5/8" pipe.140 Also, a well control equipment commissioning report to BP stated the BSR was acceptable for 6 5/8" pipe, apparently also based on the then-current Cameron bulletin.141 The DWH BSR did successfully shear 6 5/8" drill pipe when an EDS function was executed in June 2003.142 This experience shows that the SBR rams can sometimes shear the larger pipe size, but it does not establish reliability in view of the later Cameron ratings and a 2007 Cameron Product Advisory.143 At least one of the DWH senior subsea supervisors was aware the rig BSR was not rated to shear 6 5/8" drill pipe; as a result, Transocean had a work-around, multi-step procedure for the larger pipe.144 The plan was to first shear the pipe with the casing shear rams, to shear the heavier pipe but not seal it, and then close the BSR with no pipe in it. This practice may require the driller to lift the drill pipe stub above the BSR if the pipe does not go up sufficiently by itself from the reduced stretch. While a more time-consuming method, it could be accomplished by the driller or by using the emergency disconnect system set in its Mode 2 operation. However, neither the AMF/deadman nor the autoshear system could have performed this operation, so they were unreliable with the larger drill pipe during the Macondo drilling phase of the well. This was an increased risk, as an accidental LMRP disconnect or riser failure could have immediately led to a well blowout.145

139 DNV Report, Volume 2, Comprehensive Time Line: F-33 to F-83. References to 6 5/8" drill pipe in BOP testing on February 6, 9, 10, 24, 25, March 4, 26, and April 10, 2010. IADC Daily Drilling Reports, Deepwater Horizon (February 16, 2010 to April 8, 2010) describe it as 32 and 40 ppf S-135 and V-150. The Cameron shear pressure for the 32 ppf S-135 is 4,175 psi at surface, 4,400 psi in 5,000-foot water depth and 14.2 ppg mud. These pressure requirements are greater than DWH BSR power fluid pressure, which is regulated to 4,000 psi maximum. Also, planned use of the larger pipe is implied by BP’s MMS Application for Revised New Well for Macondo, which removed the previously requested departure not to test the BOPs with 6 5/8" drill pipe. 140 Deepwater Horizon, TL BOP Stack Operation and Maintenance Manual; Cameron Engineering Bulletin 702D, Rev. B1, August 1991: 6; CAM-CSB 000005989. 141 In-Spec Inc. Report of Well Control Equipment Commissioning, March 2001; BP-HZN-B LY00058800, BP-HZN-B LY00058786 142 BP Report, Appendix H: 234. 143 Cameron Product Advisory #12114, EB 702D Update Regarding Shearing Capabilities of Cameron Shear Rams, June 21, 2007; Cameron Engineering Bulletin EB 701D Rev. BP “Shearing Capabilities of Cameron Shear Rams” (1/21/2008) 144 Deposition Testimony of Jim Owen McWhorter testimony, July 20, 2011: 116 (CSB2010-10-I-OS-636949 McWhorter Designations Vol. 1 McWhorter.PDF). 145 Loss of the riser would remove its hydrostatic mud pressure from the well, replaced by lower density seawater. For Macondo 14.2 ppg mud would result in the loss of 1,470 psi. For the pay zone at 17,800 feet with 13.1 ppg pressure (BP Report, Appendix W: 18), the wellbore pressure would fall to 450 psi less than the reservoir pressure. With no BOP closed, this would lead to oil and gas flow up and out of the well at the sea floor.

CSB-FINAL REPORT-BOP(06-02-2014)

Page 39 of 83

U.S. Chemical Safety Board By Engineering Services, L.P. Cameron offers a more efficient shearing packer, the DVS, which is rated to shear the 6 5/8" pipe. The DVS also has more centering capability that the SBR, but ES could not determine if it would have been sufficient to have worked during this incident. The DWH BSR would have accepted the DVS packer. 16 BOP Accumulator Capacity Power to close and shear with the BSR is provided by metal accumulator bottles on the BOP stack which contain liquid pressurized against a volume of nitrogen gas. Prior to running the BOP, the crew must select a gas precharge that will provide the required operating volume and pressure in the water depth of the well. A design parameter is the wellbore pressure that the BSR is to close against. At the time of the Macondo drilling, there was not explicit MMS guidance on what assumptions to make and a common practice was to assume that the annular BOPs would be open, so were the BOP pressure would be the hydrostatic head of drilling mud (14.2 ppg mud in the Well Plan). On this basis, the actual DWH precharge pressure of 3,500 to 3800 psi gave a design that exceeded the API recommendation design factor of 1.1 for the 5½" drill pipe. A more conservative approach is to assume an annular is closed on the maximum anticipated surface pressure (MASP) for the well. For Macondo, BP calculated this pressure to be 7,990 psi, based on “a column of 50% gas & 50% liquid back to mudline.”146 The DWH/Macondo plan did not meet the API design factor using MASP, as the precharge would need to have been at least 4,700 psig (5½" drill pipe). Supporting details on accumulator design are in Appendix F. In the case of the Macondo incident itself, the precharge used was sufficient to meet the MSS rule. However, if the closed upper annular had sealed, the BSR would have had to close against 8,550 psia, essentially the MASP. There would not have been sufficient accumulator energy, likely leaving a flow path up the drill pipe. 17 Pressure Sensors in the BOP A pressure sensor in the BOP stack can be useful in detecting if gas has entered the riser by observing a reduction in the BOP pressure which is a high-risk situation needing immediate attention. The DWH had two such sensors147, but ES could find no reference in BP and Transocean well control manuals regarding their use in operations. There was no alarm on this device. If it had one, the driller could have been alerted about ten minutes earlier than the mud flow across the rig floor and likely would have stopped circulating, closed a preventer, and initiated response actions with only a small amount of gas in the riser. Then the blowout would not have occurred. The pressure reading could have been helpful during the negative pressure test, which was incorrectly interpreted. The evidence is that the crew did not use this device for that test; the reason is unknown. No evidence has been found that the test was used to monitor for gas in the riser. It had been used earlier in the well to assist during a

146 BP MMS Application for Permit to Drill for MC 252 (APD Worksheet 13.625 Liner). 147 Pressure/temperature sensors were installed in the LMRP and the lower BOP (RBS 8D Multiplex Control System Manual Vol. 4, Bill of Material items 202 and 203 [CAM-CSB 000004965 and 4966]). Their readouts were located on the Driller Control Panel (Ibid, Vol. 5, Control Panel Drawing SK-122106-21-04 [CAM-CSB 000005286]).

CSB-FINAL REPORT-BOP(06-02-2014)

Page 40 of 83

U.S. Chemical Safety Board By Engineering Services, L.P. well control operation;148 the reported data suggest an accuracy of only +/- 400 psi, but their precision (sensitivity to change in pressure) appeared to be +/- 10 psi. Also, the pressure data has potential value in detecting gas in the drilling riser (by pressure falling). An improvement might be the development and installation of an alarm. 18 Conclusions/Lessons to be Learned to Avoid Similar Incidents Upper Annular Failure

  1. If the upper annular had sealed, considerably less gas and oil would have entered the riser. This smaller

volume should have had a lower likelihood of (or delayed) explosion, and the explosion could have been less severe.

  1. The annular failure probably was due to an inability to close and seal under high flow rate, likely due to

erosion of its rubber packer sealing material.

  1. BOP Phase 2 results did not find any damage in the operating mechanism, ruling out such a cause.

Lesson: Consider closing in a preventer other than the annular immediately after closing in on a high flow rate. Annular preventers may not seal when closing in on a high flow rate of some unknown threshold value. VBR Pipe Rams

  1. The middle VBR pipe ram successfully stopped a high flow rate and sealed the well.
  2. Ram type preventers probably have higher flow rate capability than annulars, but their use as a default

first shut-in device is impaired by their design pipe size restrictions (including tool joints).

  1. ES believes that the crew likely closed only the middle VBR, and not the upper VBR.
  2. The seal of the closed VBR was lost at some point later, likely to due to high temperature from the

flowing fluid, which approached the rating working temperature of the VBR rubber. There are conflicting goals in the selection of BOP elastomers, specifically to be flexible at low temperatures, but not extrude out at high temperature. Elastomers become more fluid with increasing temperature, so it should be recognized that sustained high flow may ultimately cause wellhead temperature to exceed elastomer capability and lead to failure.

Blind Shear Ram Failure

  1. ES concludes that the AMF/deadman system probably functioned to close the blind shear ram on the loss

of surface utilities, including electrical power, communications, and hydraulic pressure.

  1. The autoshear system149 was functioned by ROV intervention and closed the BSR, if it had not been

already closed by the AMF/deadman.

  1. The DWH drill pipe was located off-center nearly against the BOP wall at the time of BSR actuation. Its

position prevented the BSR from closing enough to seal with the available closing energy. The BSR did, however, rupture the drill pipe, releasing its shut-in pressure and providing a new flow path for reservoir fluids to the surface.

148 DNV Report, Volume 2, Timeline, March 10, 2010, F-57 to F-61 149 Autoshear is defined by API Specification 16D as “a safety system that is designed to automatically shut in the wellbore in the event of a disconnect of the LMRP. When the autoshear is armed, a disconnect of the LMRP closes the shear rams.”

CSB-FINAL REPORT-BOP(06-02-2014)

Page 41 of 83

U.S. Chemical Safety Board By Engineering Services, L.P.

  1. The drill pipe was off-center due to buckling by a combination of axial force and internal pressure.

Industry had not previously recognized that drill pipe would buckle in a BOP under certain high pressure conditions.

  1. The location of closed middle VBR determined how far off-center the buckled drill pipe was at the BSR.

If the upper VBR, which was closer to the BSR, had been closed by the crew, the drill pipe would have been substantially less off-center and the BSR might have been able to seal. Lesson: Investigate the conditions for pipe buckling in the BOP during well control to develop recommendations for BOP arrangement considerations and well control procedures.

  1. A higher accumulator precharge would have increased the available shearing pressure, but FEA computer

modeling concluded that the required shearing pressure was far beyond even a maximized accumulator capability.

  1. A higher capacity shear packer was available and was Cameron-rated to shear the larger drill pipe. It is

not known if this packer would have sheared and sealed the off-center 5½" pipe. (See near-miss learning on this topic below.) Blind Shear Ram – Near-miss lessons

  1. The blind shear ram packer did not have a Cameron shear rating suitable for the 6 5/8" drill pipe that was

used for most of the Macondo drilling. It is unknown if BP or Transocean was aware of this discrepancy or had other reasons to believe the BOP could reliably shear and seal the 6 5/8" drill pipe actually used. Lesson: Check for suitable BSR capability before each well and again during any rig or major well design changes.

  1. If the closed annular had sealed as designed, gas already in the riser could have surfaced and led to an

explosion and triggered the AMF deadman to close the BSR. However, in this scenario, the accumulator system might not have been capable of providing sufficient BSR operator energy to overcome the increased wellbore pressure that would have occurred. A partial closure would have created a flow path up the drill pipe. The Bureau of Safety and Environmental Enforcement rules now require that the blind shear ram be able to shear against maximum anticipated surface pressure (MASP).150 Lesson: Check for suitable BOP accumulator capacity to close the BSR under MASP conditions. Assess if the MASP basis is consistent with risk assessment scenarios for the well. Controls (in separate ES report on the MUX control system)

  1. Based on testing and evaluation of the BOP MUX control system, the AMF/deadman probably functioned

correctly even though several known deficiencies existed in the AMF and SEM (Subsea Electronics Module).151 Accumulator capacity

  1. The BSR was powered by an accumulator system which met API, BP, and Transocean standards for the

5½" drill pipe in the BOP at the time of the incident.

150 CFR § 250.416(e). 151 See separate ES report on MUX Control System.

CSB-FINAL REPORT-BOP(06-02-2014)

Page 42 of 83

U.S. Chemical Safety Board By Engineering Services, L.P. Lesson: Engineering should determine and rig crews should verify correct LMRP and BOP accumulator precharge pressures, meeting or exceeding API standard 16D criteria, including the volume for all ram locking and valve closing mechanisms that may be operated by deadman and autoshear systems.

  1. The BOP accumulator design depends on the pressure needed to operate the BSR. If the DWH upper

annular had sealed, the accumulator and BSR would not shear even a centered 5 ½” drill pipe. A higher precharge of 5000 psig, instead of 3700 psig, would have been needed. The MMS rule on the BOP pressure basis for BSRs was not clear prior to the incident. Lesson: Designing the BSR and accumulators to shear pipe with a maximum anticipated wellhead/BOP pressure would reduce risk. Since the incident, BSEE has adopted this requirement. Negative Pressure Test

  1. While not directly related to failure of the BOP, the negative pressure test was inadequate both in the

level of detail in the procedure and in the execution by the rig crew. The procedure did not contain sufficient information on steps, expected pressures at key points in the displacement and bleeding, expected bleed volumes, and criteria for a positive test. The inclusion of a large volume of dense, thick spacer made the test more complex and difficult to interpret pressures, especially if under-displaced and the pressure test point changed to the kill line. The Chief Counsel Report contains additional information and discussion.152 Lesson: Leaving negative test key steps and expected volume/pressure parameters to on-site, same day development increases the risk of incorrect test interpretation. Crew monitoring

  1. The DWH crew decision to close a preventer came only after a dangerous amount of oil and gas had

already entered the riser and flow rates had become very high. The well flow could have been detected much earlier when rates were much lower and likely to been within equipment capability to handle (e.g., annular preventer and diverter system). Lesson: Rig floor crews should always check that riser stays full after shutting off pumps, including during negative pressure tests. Lesson: Even after casing is in place and cemented, rig crews should continuously monitor both return circulation flow rates (in versus out) and pit levels, to detect a possible loss of well integrity. BOP pressure sensor

  1. The BOP stack contained a pressure sensor that, if used, could have led to better crew decision on the

negative pressure test.153 The instrument was operable, and ES could not determine why it was not used during the negative pressure test as a check against the conflicting drill pipe and kill line pressure

152 Chief Counsel Report, Section 4.6, pg. 143 153 These sensors were used a month earlier to monitor BOP pressures during the well control event on March 10, 2010; DNV Report, Volume 2: F-57 to F-61. The accuracy (report correct pressure) of these gauges is suspect, and the two differed by 700 psi in their readings. Even so, it appears that their precision (ability to detect changes in pressure) was good; therefore, they have operational value. The BOP sensor was to be checked in Phase 2 Testing.

CSB-FINAL REPORT-BOP(06-02-2014)

Page 43 of 83

U.S. Chemical Safety Board By Engineering Services, L.P. measurements. Also, equipping the measurement with an alarm could have automatically warned of gas in the riser (reduced pressure), enabling an earlier crew response. Lesson: Drilling contractors should develop and implement crew training on the various uses of any BOP pressure and temperature sensors. Industry should consider alarm settings for BOP pressure falling below mud hydrostatic or recent pressure history.

Report prepared under CSB contract with Engineering Services, LP P.O. Box 5811 Kingwood, Texas 77325-5811

Caveat and Disclaimer All opinions and conclusions stated in this report are based upon information as ES had at the time that this report was prepared. A change in any fact or circumstance upon which this report is based may affect what is expressed in this report. NO IMPLIED WARRANTY OF MERCHANTABILITY OR FITNESS FOR A PARTICULAR PURPOSE SHALL APPLY. ENGINEERING SERVICES, LP MAKES NO REPRESENTATION OR WARRANTY THAT THE IMPLEMENTATION OR USE OF THE OPINIONS OR CONCLUSIONS OF THIS REPORT WILL RESULT IN COMPLIANCE WITH APPLICABLE LAWS OR PERFECT RESULTS.

CSB-FINAL REPORT-BOP(06-02-2014)

Page 44 of 83

U.S. Chemical Safety Board By Engineering Services, L.P. Appendices

A. Incident Post-Explosion Events154 April 20 0 minutes (9:49 p.m.): Explosion 5 minutes (9:54 p.m.): Rig drifts to an offset of 2’ to 12’ from original location (for assumed range of wind/current velocities from 4/0.1 knots to 10/0.2 knots.155) The associated drill pipe lift is less than 0.1".156 Between 2 and 9 minutes (9:51 p.m. to 9:58 p.m.): AMF deadman should have activated blind shear ram. 7 minutes (9:56 p.m.): Attempt to activate EDS (Emergency Disconnect System) fails; alarm indicates low accumulator pressure, indicating loss of hydraulic pressure. 10 minutes (10:01 pm): Rig offset is 8’ to 45’; associated drill pipe lift is less than 2" (calculated). Within 30 minutes (time unknown): Drill pipe loses pressure integrity at the surface, allowing flow to resume up the drill pipe. Probable cause was fire damage to the drill pipe swivel or to the mud hose connecting the top drive and standpipe. ~30 minutes (10:19 p.m.): Top drive falls ~ 26 feet to rig floor.157 Rig offset is 70’ to 400’; associated drill pipe lift is 0.5’ to 15’ (calculated). April 22 7:36 a.m.: ROV intervention activates autoshear system to close BSR (if not already closed by AMF), but BSR fails to seal. 10:30 a.m.: Deepwater Horizon sinks.

154 DNV Report, Volume 2, Timeline information. 155 Appendix J. ES rig movement calculations using drag force coefficients. 156 Drill pipe lift/offset calculations made by ES. 157 Transocean Report, 162.

CSB-FINAL REPORT-BOP(06-02-2014)

Page 45 of 83

U.S. Chemical Safety Board By Engineering Services, L.P. B. BOP Stack Components

Figure B-1 – Deepwater Horizon BOP stack158

158 Transocean Report, 139.

CSB-FINAL REPORT-BOP(06-02-2014)

Page 46 of 83

U.S. Chemical Safety Board By Engineering Services, L.P. BOP Arrangement

Figure B-2 – Arrangement of LMRP and BOP stack sections159 (TrialGraphix) Both DWH annulars were Cameron model DL 18 3/4" (10,000 psi WP). Annular preventers are intended to close around pipe of any diameter (or even an open hole) and to seal the annulus. They do not affect the flow path within the pipe.

159 Chief Counsel’s Report; National Commission Report, Figure 2.9 (modified to change name of lower pipe ram to middle pipe ram).

CSB-FINAL REPORT-BOP(06-02-2014)

Page 47 of 83

U.S. Chemical Safety Board By Engineering Services, L.P.

Figure 11: Cameron D annular preventer closing mechanism A colorized view of the basic parts; seals by the rubber donut (green) pushing the insert packer (grey) against the pipe. Figure 11 illustrates the design of the Cameron annular. When closing pressure is applied (in spaces below the blue operating piston), the piston up and compresses the rubber donut, which in turn pushes inward on the Packer Insert (grey). As the packer closes, the annular flow space decreases and begins to restrict flow and then seal the annulus. Blind shear rams (BSR) The blind shear ram, when used in its shearing mode, is intended as a last resort to seal off a well from flowing. The BSR was intended to shear through drill pipe that may be in the BOP and then to provide a seal. There are limits to what size and type of drill pipe can be sheared. These limits are affected by the shear packer used, the wellbore pressure, and the accumulator system capability to provide the required operating fluid in sufficient volume and pressure. The DWH BSR was a Cameron model TL 18 3/4" (15,000 psi WP) with a type-SBR shear packer. Casing shear rams (CSR) Casing shear rams are intended as a last resort to shear casing in the BOP, but have no sealing capability. The DWH CSR was a Cameron model TL 18 3/4" (15,000 psi WP) with Super Shear operating bonnets. The CSR was not a contributing factor of the Macondo blowout.

CSB-FINAL REPORT-BOP(06-02-2014)

Page 48 of 83

U.S. Chemical Safety Board By Engineering Services, L.P. Variable Bore Ram (VBR) pipe rams VBRs are a type of pipe ram that can close on a range of pipe sizes. Pipe rams are intended to close around drill pipe and provide seal of the annulus (e.g., to prevent a well from flowing). They do not affect flow within the drill pipe. The DWH BOP had four Cameron model TL 18 3/4" (15,000 psi WP) with standard operating bonnets. All were equipped with VBR packers to close against a range of pipe outside diameters, 3½" to 6-5/8". Pipe rams and VBRs are designed to hold a pressure differential only from one direction, usually from below. The DWH VBR in the lowest BOP position was installed intentionally upside down to hold pressure from above, and it was designated as a Test Ram. This arrangement saves time in conducting the periodic subsea pressure tests of the BOP stack. In this role, it served no purpose in dealing with a well control event. It was not counted in meeting regulations or industry standards for BOP equipment. ST Locks The BSR and all VBRs were equipped with ST Locks. These devices can be actuated to keep a VBR closed even if operating pressure is lost. (Loss of MUX communication will vent all operating closing pressures.) The locks require a certain operating volume and pressure as well, but they will remain in the locked position even if operating closing pressure is then lost. BOP accumulators The DWH had two subsea accumulator banks. The accumulator bank of primary interest, located in the lower BOP section, provided a self-sufficient operating fluid source for the blind shear ram (BSR) and certain other functions.

CSB-FINAL REPORT-BOP(06-02-2014)

Page 49 of 83

U.S. Chemical Safety Board By Engineering Services, L.P.

Figure B-3 – Accumulator bottles on the lower BOP, 4 each on two sides As shown in Figure B-3, this accumulator system had eight 80-gallon steel bottles, rated for 6,000 psig maximum differential internal pressure. The bottles are prefilled with nitrogen gas up to a precharge pressure that has to be determined for each water depth, intended to be about 3,700 psia for Macondo. After running the BOP, high pressure hydraulic fluid from the surface is pumped into the bottles until they reach their charged pressure. For Macondo, the charged pressure was about 7200 psia, the result of the 5,000 psig surface pressure plus a hydrostatic head of about 2200 psi for 5000 feet water depth. There was also an LMRP accumulator bank that supplemented the surface supply of hydraulic fluid in normal operating BOP functions. It does not appear that the LMRP accumulator bank contributed to any of the Macondo failures. Primary control system overview The primary control system for the BOP functions was Cameron Mark 2, a multiplex electro-hydraulic system manufactured by Cameron Controls. Commands are entered by pushing buttons at one of the several surface controls panels. A coded electric signal is sent down the MUX cable to two redundant pods (called yellow and blue) on the LMRP, In each pod, the MUX signal is decoded and an operating voltage is sent to the appropriate solenoid valve(s). Pressured hydraulic fluid (5,000 psig surface pressure) is provided from the surface to accumulator (storage) bottles on the LMRP. High-pressure fluid is routed to one of the Yellow/Blue sets of solenoids, according to a pod selection setting at the surface. From the actuated solenoid valves, the high-pressure fluid is piped to an operating piston for the chosen function. (For many functions, the system sends the pressure to a pilot-operated valve of larger size for more flow capacity.)

CSB-FINAL REPORT-BOP(06-02-2014)

Page 50 of 83

U.S. Chemical Safety Board By Engineering Services, L.P. The solenoid valves have a non-energized, spring-return position. In the non-energized position, most functions are vented (i.e., bleed the function fluid). Also, most functions require a separate command operation to open and to close. Exceptions to this include the choke and kill valves which have a fail-safe spring to close in addition to the hydraulic close. The hydraulic fluid was water-based, and the system was not closed loop, with used fluid being discharged to the sea. Back-up BOP control systems: EDS, deadman, autoshear, & ROV The DWH BOP had four back-up control systems: The EDS (Emergency Disconnect Sequence): Operated from any of several control stations at the rig, including the rig floor and bridge. The EDS performs a pre-programmed sequence of BOP functions, including actuation of the BSR followed by disconnect of the LMRP from the BOP. The AMF/deadman (Automatic Mode Function): If the subsea pods detect that electric signal and hydraulic supply are both lost to both control pods, each pod will activate its deadman function. This simultaneously closes all choke & kill valves, sets all VBR locks, and closes the BSR. Autoshear: A trigger valve sensor was installed in the BOP stack to detect an accidental disconnect of the LMRP, at which time it initiates the same functions as the deadman system (close BSR and set ST Locks). ROV panel (Remotely Operated Vehicle): Intervention with an ROV connects to subsea stabs to activate certain BOP functions.

CSB-FINAL REPORT-BOP(06-02-2014)

Page 51 of 83

U.S. Chemical Safety Board By Engineering Services, L.P. C. Condition of BOP as Found Condition of Annular Preventers160 Both annular preventers were disassembled and inspected by DNV. The upper annular (UA) was found essentially completely closed with all elastomer eroded away from the steel fingers of the packer (Figure 12). The size of the opening was about six inches. The 5½" drill pipe (in the BOP at the time of the incident) tool joint OD was 6.5".

Figure 12: DWH upper annular after recovery161 Viewed with a borehole camera through the UA hole, the lower annular (LA) was found in a nearly open position with some erosion damage to its packer. The intervention team had attempted to close the LA four times, but closure was impeded by leaks in the hydraulic lines.162 The operating mechanisms of both preventers were found undamaged. Condition of Variable Bore Rams (VBR)163 The examination found the upper, middle, and lower VBR preventers all in the closed position. Their ST locks were all engaged except for one of the lower VBR locks, which was in the unlocked position. The packers of all VBRs were moderately to severely eroded.

160 DNV report, 106-107; and DNV Phase 2 examination 161 From DNV Michoud examination. 162 DNV Report, Vol. 2, F-140. 163 DNV report, 4, 61-73

CSB-FINAL REPORT-BOP(06-02-2014)

Page 52 of 83

U.S. Chemical Safety Board By Engineering Services, L.P. Condition of Blind Shear Ram (BSR)164 The BSR was found closed during initial recovery on the Q4000 rig.165 The BSR and the adjacent BOP wall had major erosion and almost all of its elastomeric components were eroded. The forensic evidence revealed that the drill pipe was off-center in the BSR (5.5 inches, or 1.2 inches from the BOP wall) at the time of attempted shearing.166

164 Ibid, 53-56, 100 165 YouTube, “Deepwater Horizon BOP secrets” video from Q4000 166 See Figure 14: Drill pipe off-center distance from DNV laser scans of DP and BSR block, pg. 28 in this report

CSB-FINAL REPORT-BOP(06-02-2014)

Page 53 of 83

U.S. Chemical Safety Board By Engineering Services, L.P. D. VBR Closing Force Calculations on the Bowed Drill Pipe Closing force calculation: With the control system de-energized and vented to the sea floor ambient pressure, a ram closing force can be developed by the pressure in the BOP being less than the sea water pressure outside, both acting on opposite ends of the control rod area (6.743" diameter).167 As gas unloaded the DWH riser, the BOP pressure fell below sea water pressure at about 9:48 p.m., and continued to fall.168 ES assumes that the pressure reached a minimum value no less than 1000 psia.169 This closing force must be transmitted through a complex motion of the VBR AEP (Anti-extrusion plate) ‘fingers’, and the resulting squeezing force would be resisted by the buckling lateral force trying to keep the pipe off-center. Determining the net squeezing force requires a simulation of this complex VBR mechanism, illustrated in Figures D-1 to D-3.

Figure D-1: VBR closing on centered pipe

167 Cameron CAD file: cam-csb-cad007 - highly confidential tail rod.igs. 168 BP Report, Appendix W, Figure 3.35. At 9:48 p.m., Figure shows a calculated a pressure of 1,500 psia 169 Assumes riser did not collapse prior to autoshear operation: sea water pressure 2200 psi less. ES calculated DWH collapse rating of 1,574 psi = 625 psi.

CSB-FINAL REPORT-BOP(06-02-2014)

Page 54 of 83

U.S. Chemical Safety Board By Engineering Services, L.P. An off-center pipe further complicates the calculation, as VBR closing is shown in 5 sequential steps in Figures 17 and 18. Note in Figure 17 that the ram block wedge and U-shape will push directly force the pipe into a deflection of 1.3 inches, as depicted in the 3 steps.

Figure D-2: VBR ram blocks closing on a pipe off-centered by 1.3 inches - first 3 steps. Green and blue lines outline the two ram blocks, which each contain 6 EAP fingers.

Figure D-3 – After the ram blocks come together, the EAP fingers slide across each other to rotate and move in. Much of the closing force is absorbed by steel-on-steel friction as the AEP fingers slide across each other to rotate and move in, shown by the red arrows in Figure D-3. For the case shown, the squeezing force reaches equilibrium with the outward buckling force (orange arrow) after only a small reduction in the off-center position. The amount depends on the wellbore pressure and the steel-on- steel friction coefficient for the EAPs sliding across each other.

CSB-FINAL REPORT-BOP(06-02-2014)

Page 55 of 83

U.S. Chemical Safety Board By Engineering Services, L.P. Centering forces were calculated for various assumed steel-on-steel friction factors and for two BOP pressures to be compared with deflection forces from an FEA buckling model. FEA deflection force calculations: ES used results from ANSYS FEA pipe non-linear buckling analysis to determine the pipe resistance to being pushed in.170

Figure D-4 – ANSYS Non-linear buckling analysis set-up The finite element model contained 94,199 solid (high order) elements. The drill pipe was modeled as elasto- plastic steel using a multi-linear plasticity model. A tensile axial force load (10,000 lb.) was applied at the bottom end of the drill pipe. Drill pipe internal pressure is increased until and beyond buckling. Solution details: An initial step was solved using the following loading conditions:

  1. A lateral perturbation force (500 lb) was applied in the +X direction 15 ft below the UA.
  2. The axial pipe force was ramped from 0 to 10,000 lb.
  3. The internal pressure in the pipe was ramped from 0 to 4000 psi.
  4. The external pressure on the pipe (below the closed MVBR) was ramped from 0 to 5539 psi.

A second step was used to complete the loading as follows: 1. The perturbation force was removed. 2. Axial pipe force was maintained at 10,000 lb. 3. Internal pipe pressure was ramped from 4000 to 7000 psi. 4. External pipe pressure (below the MVBR) was ramped from 5539 to 7539 psi.

170 Deepwater Horizon BOP Analysis - Task 4B-3 (2A Addendum): Nonlinear Buckling Model Drill Pipe Under Internal Pressure , Nov. 2012

CSB-FINAL REPORT-BOP(06-02-2014)

Page 56 of 83

U.S. Chemical Safety Board By Engineering Services, L.P. The calculation results are shown in the next two figures.

Figure D-4 – ANSYS Non-linear buckling forces – 1.0 inch UVBR deflection case

Figure D-5 – ANSYS Non-linear buckling forces – 1.2 inch UVBR deflection case

CSB-FINAL REPORT-BOP(06-02-2014)

Page 57 of 83

U.S. Chemical Safety Board By Engineering Services, L.P. In the figures below, the FEA results are plotted (dashed red line) along with the solid lines for the centering forces described earlier.

Figure D-6: VBR being held open by buckling if 1700 psia in BOP

Figure D-7 – VBR being held open by buckling if 1000 psia in BOP Considering the two pressure cases and all assumed friction cases in the two figures, the calculated equilibrium deflections range from 0.86 to 1.15 inches.

CSB-FINAL REPORT-BOP(06-02-2014)

Page 58 of 83

U.S. Chemical Safety Board By Engineering Services, L.P. E. FEA Modeling of BSR171 An FEA model of the BSR was developed using ANSYS FEA software. This appendix supplements the discussion in the main report body. The BSR ram components and drill pipe were modeled using ≈145,000 solid finite elements. The section of BOP cavity and the push rods are modeled as rigid. The assembly components are related using ≈ 70,000 contact element types.172 Components of the BSR assemblies are modeled using both steel and elastomer materials. Steel is modeled using a multi-linear isotropic hardening rule while the elastomer is modeled using a Neo-Hookean hyper-elastic property. Runs were first made with centered drill pipe to compare with Cameron rating and then drill pipe off-centered near the BOP wall (5.5 inches off-center, 1.2 inches from BOP wall), based on DNV laser scan analysis173.

Figure E-1 – FEA model geometry and element mesh

171 Deepwater Horizon BOP Analysis – Tasks 2 and 5-2: BSR Model Creation and Shearing Simulation, Dec. 2012 172 BSR dimensions from Cameron CAD drawing: cam-csb-cad001-bsr.igs 173 See Figure 14: Drill pipe off-center distance from DNV laser scans of DP and BSR block, pg. 28 in this report

CSB-FINAL REPORT-BOP(06-02-2014)

Page 59 of 83

U.S. Chemical Safety Board By Engineering Services, L.P.

Y-axis force, mN; X-axis is time, msecs; to convert to inches movement, multiply by 0.1576 Figure E-2 – Centered drill pipe gave a maximum shearing pressure of 2,739 psi Cameron rating 2,857 psi174; DNV Abaqus FEA gave 2,408 psi175

174 Calculated by ES using Cameron EB 702D, Jan. 2008 175 DNV report 159

CSB-FINAL REPORT-BOP(06-02-2014)

Page 60 of 83

U.S. Chemical Safety Board By Engineering Services, L.P.

Figure E-3 – drill pipe off-centered near BOP wall: pipe shears at 2,550 psi; BSR seal not yet engaged with 5,478 psi at end of time (start position/time was greater than Figure E-2 due to wedge shape)

CSB-FINAL REPORT-BOP(06-02-2014)

Page 61 of 83

U.S. Chemical Safety Board By Engineering Services, L.P. F. Control System: BSR Actuation Scenarios There are two moments during the incident when the BSR could have been initially closed. (It is generally agreed that the crew did not actuate the BSR, as it would not be consistent with their training176 or industry guidelines.177) BSR was closed by AMF/deadman control system When the MUX and hydraulic supply communication were lost, the AMF/deadman should have initiated. Within about a minute, hydraulic fluid should go simultaneously to the ST Locks (closing the locks on the already closed UPR), the choke & kill valves (were already closed by fail-safe springs), and the BSR. Or AMF/deadman failed to trigger, and BSR was closed by ROV initiation of the autoshear control About 32 hours after the initial explosion, an ROV cut a rod to actuate the autoshear, a back-up system to close the BSR. No change in flow was observed, indicating that any change was too small to observe and that the BSR did not seal.178 G. Temporary abandonment draft procedures illuminate the differences for various options In this section, the various procedure options that were considered for the Macondo well are reviewed and compared to the negative test objectives in order to illustrate both the range of the options and the decision process that was used. There are many variations possible in performing such a test, each with its advantages and disadvantages affected by the particular well characteristics, such as water depth and fluid densities. While these steps improved the procedure, ES found no explicit risk assessment step for the approved procedure. About April 14, the temporary abandonment plans were changed to include a negative pressure test; the original version appears to be based on one planned for another BP rig, the Discoverer Enterprise.179 The Discoverer procedure used the kill line by replacing its mud with low density base oil. Then with an annular closed to isolate the well, the kill line was bled and checked for no pressure and no flow. The tested negative pressure using this procedure was 1,844 psi,180 which would have been greater than the 1,755 psi181 value that would occur with a wellbore cement plug at 1000 feet (the usual MMS limit) and then the mud above the plug removed. However at Macondo, the cement plug was being planned for 3,300 feet below the seafloor, which increased the necessary

176 Transocean report, 177 177 IADC Deepwater Well Control Guidelines, section 2.6, “Gas in Rise Riser Diverter” 2-29 178 DNV report, 139 179 2/28/2010 e-mail, Discoverer Negative test of liner top discussion: Fowler to Stoltz, et al.; BP-HZN-BLY00062447; CSB2010-10-I-OS-51888. 180 Test negative pressure using 7 ppg base oil to seafloor = (water depth + rig floor height) x (mud density – test fluid density) = 0.052 (units conversion) x (4992’ + 75’) x (14 - 7 ppg) = 1844 psi. 181 Needed test negative pressure value using water to cement plug at 1000’ below seafloor = (cement plug + water depth + rig floor height) x mud density – (cement plug + water depth) x sea water density = 0.052 (units conversion) x (1000’ + 4992’ + 75’) x 14 ppg – (1000’ + 4992’) x 8.55 ppg = 1755 psi.

CSB-FINAL REPORT-BOP(06-02-2014)

Page 62 of 83

U.S. Chemical Safety Board By Engineering Services, L.P. test negative pressure beyond what the original procedure could provide. The table blows shows this and other procedure characteristics for the various versions. The procedure evolution can be organized into the seven versions summarized in Table G-1. The first three versions continued to use the kill line. Version 3 is from the MMS application form with the somewhat ambiguous wording “Negative test casing to seawater gradient equivalent for 30 min. with kill line” implying that the kill line would be filled with seawater, not base oil as internal versions continued to state until version 5.

Test parameters Underbalance pressures Procedure draft version draft date182 Test before setting cement plug? Test location Fluid in drill pipe* Fluid in kill line Actual prior to test Tested value (need 2371 psi) 1 4/14 no kill line n/a base oil 0 psi 1844 psi 2 4/15 yes kill line n/a base oil 0 psi 1844 psi 3** 4/16 yes kill line n/a water? 0 psi 1470 psi 4*** 4/18 11AM yes kill line n/a base oil 0 psi 1844 psi 5 4/18 5PM yes wellbore water water 2371 psi 2371 psi 6 4/20 10AM yes drillpipe or kill line water water 2371 psi 2371 psi 7**** 4/20 yes same water water 870 psi 2371 psi Table G-1: Evolution of procedure for performing the negative pressure test

** Version 3 was the method submitted on the MMS application. *** Version 4 included a flow check after water displacement as a second test at full underbalance. **** Added 16 ppg spacer to the displacement; intended to be above the BOP during test

Version 4 added a flow check after the negative test and the complete displacement to water as a test to a greater underbalance pressure, implicitly recognizing that the kill line test was using too low a test value for water to 8,367 feet. The table shows the kill line test versions were getting less than the needed 2,371 psi. Version 5 dropped the kill line test and would have relied on the flow check detection as a negative test, which has less control and more risk than a bleed type of negative test. Version 6 (April 20 Ops note Email) changed to a controlled test, filling the drillpipe and well annulus to achieve the needed underbalance. The Ops note did not specify if the bleeding and pressure monitoring should be done on the drillpipe or the kill line. Either can work, but using the kill line has somewhat more risk, as it is more likely to be affected by problems in the displacement, which did occur at Macondo.

182 4/14: e-mail Brian Morel to Ronald Sepulvado, BP-HZN-CSB00160178; 4/15: GoM Exploration Wells Surface and Cement Plug, 8, BP-HZN-CSB00027980; 4/16: Form MMS-124 Temporary Abandonment Procedure, 3, BP-HZN- CSB00163050; 4/18AM: 10:37 AM e-mail Brian Morel to John Guide, BP-HZN-BLY00070087; 4/18PM: 5:09PM e-mail Brian Morel to John Guide, BP-HZN-BLY00070087; 4/20AM: e-mail Brian Morel to Don Vidrine, Robert Kaluza et al., BP- HZN-CSB00056581; 4/20: BP report, Appendix P, 2

CSB-FINAL REPORT-BOP(06-02-2014)

Page 63 of 83

U.S. Chemical Safety Board By Engineering Services, L.P. This version called for displacing water all the way back up the annulus to the BOP. This condition allows for the test to be conducted on the kill line or the drillpipe, but it has the disadvantage of under-balancing the well prior to the test, as indicated in the table, much like Version 5. If the well does not have integrity and the underbalance is below reservoir pressure, the well will kick (take an influx) during the displacement, requiring crew detection and well control response. A kick did not actually occur because an insufficient displacement left 2,000 feet of spacer below the BOP,183 so that only about a 380 psi underbalance was actually achieved on the annulus side, leaving wellbore pressure above bottom hole reservoir pressure. A variation to avoid under-balancing the annulus would have been to displace only the drill pipe with water and limit the test to the drill pipe side. There is no evidence this was considered. Version 7 included a large volume (over 400 bbls) of 16 ppg spacer fluid in the displacement, whose hydrostatic head in the riser reduced the amount of underbalance before and immediately after the test. As long as the dense spacer was completely in the riser, it should not have affected the test. As it turned out, spacer was in the BOP and the wellbore below, significantly affecting pressure and flow measurements on the kill line. H. BOP Accumulator System The DWH lower BOP accumulator system provided high pressure power fluid (4000 psig) for manual high- pressure (HP) BSR functions (including EDS) and for both the AMF and autoshear automatic emergency systems to close the BSR as well as any unset ST locks and any open choke and kill inner valves.184 This system had eight 80-gallon bottles and, once initiated, was designed to operate without assistance from surface hydraulic power. A smaller separate accumulator system of four 60-gallon bottles was on the LMRP to enhance the surface source for normal functions at a lower operating pressure (1500 psig). How an accumulator works An accumulator system consists of multiple metallic bottles. Each bottle has an internal piston that separates its nitrogen gas precharge from subsequently pumped in high-pressure hydraulic fluid. Based on planned service conditions, the precharge pressure is calculated, and nitrogen gas is added or removed to set this pressure in each bottle before the BOP is run to the seafloor.

183 Estimates are based on an ES simulation. 184 Although DWH drawings indicate that only the BSR and ST-Locks are operated, examination of the BOP stack at Michoud revealed that all four inner CHOKE & KILL valves were also hooked up the AMF/deadman and autoshear systems.

CSB-FINAL REPORT-BOP(06-02-2014)

Page 64 of 83

U.S. Chemical Safety Board By Engineering Services, L.P.

Figure H-1: Accumulator bottle charge and discharge example Referring to Figure G-1, once the BOP is run, hydraulic fluid is pumped at a surface pressure of 5,000 psig (for the DWH). The fluid travels down the supply line and charges both the LMRP and BOP accumulator bottles. The resulting pressure in the bottles is 7,215 psi absolute, as 2,200 psig of hydraulic fluid hydrostatic head is added to the surface pressure, plus 15 psi atmospheric reference pressure. The gas volume in the bottles is compressed during this charging, its volume being replaced by the now stored hydraulic fluid. How much fluid is stored depends on the pressure (P) – volume (V) – temperature (T) characteristics of the nitrogen gas. For surface BOPs, the API specification for BOP control systems (16D) allows for the use of the ideal gas law to calculate the volume change, the assumption being that the term P x V / T is a constant. However, for deep water applications, API specifies that real gas behavior data be used to reflect the widening difference between ideal and real behavior that occurs at very high pressures. A BOP operation that requires the fluid to be delivered in a short time period is called a rapid discharge system. For such a system, 16D specifies that expansion cooling (adiabatic) of the gas be explicitly considered. This cooling causes the gas pressure to reduce faster. The DWH BOP accumulator bottles came under this requirement.

CSB-FINAL REPORT-BOP(06-02-2014)

Page 65 of 83

U.S. Chemical Safety Board By Engineering Services, L.P. Accumulator: required operating volumes In setting up or checking a BOP AMF/deadman and Autoshear system for a particular well, the required operating volume must be established, and in the case of Macondo, this is not just the BSR itself. The DWH HP BSR was set up also to close any inner choke and kill line valves that were open, and to close the ST locks of any closed rams. These actions could all occur at the same time. Table H-1 lists the resulting operating volume requirements, as compiled by ES.185 item number volume each maximum item volume comment Close any open choke & kill inner valves up to 4 0.75 gal. 3.0 gal Should fail-closed Set ram ST Locks up to 3** 3.4 gal. 10.2 gal.** Assumes BSR locks set after shearing Close BSR 1 24.6 gal. 24.6 gal.

total volume 37.8 gal. maximum design *If BSR lock engages before the position of peak shear load, then an additional 3.4 gal. of high pressure fluid is needed. Note: the BSR ST lock volume is excluded, assuming the locking starts after the blocks pass their peak shearing load.186 Table H-1: Operating volumes for deadman functions – ES maximum design basis The above design basis is very conservative as it assumes all of its items must be operated. In reality, the choke & kill valves have fail-safe springs and should be already closed, absent an unusual condition,187 at the time of a deadman or autoshear actuation; the choke & kill operators do not use any volume on already closed valves. Also, ST locks do not use any volume unless their VBR is already closed. ES suggests that a reasonable assumption is that no more than one VBR/pipe ram would be closed, so only one ST lock would likely need volume. Table H-2 shows that this design basis reduces the total volume to 28 gallons; this will be referred to as the “realistic’ design basis.” item number volume each ‘realistic’ item volume comment Close choke & kill valves Assume 0 0.75 gal. 0 gal Should fail-closed Set 1 pipe ram ST Lock Assume 1 3.4 gal. 3.4 gal. Assumes BSR locks set after shearing Close BSR 1 24.6 gal. 24.6 gal.

total volume 28.0 gal. ‘realistic’ design *If BSR lock engages before the position of peak shear load, then an additional 3.4 gal. of high pressure fluid is needed. Table H-2: Operating volumes for deadman functions – ES ‘realistic’ design basis During the Macondo incident, there were two VBRs closed (or mostly closed) whose ST Locks might have been be set before the peak BSR pressure requirement. There is no evidence that any volume was needed for the choke

185 Deepwater Horizon TL BOP Stack Operation and Maintenance Manual, Cameron, 3-42, 4-14, CAM-CSB00005805 186 The CSB ANSYS FEA model indicated that the peak shearing load occurs when the blocks are 2.2 inches from fully closed (shearing centered 5 ½” pipe). If the locks start to start to engage before the peak shear load, then the “Total volumes” in Tables F-1 and F-2 need to be 3.4 gal. larger. 187 Examples: a broken spring, an usually high friction or other resistance to closing.

CSB-FINAL REPORT-BOP(06-02-2014)

Page 66 of 83

U.S. Chemical Safety Board By Engineering Services, L.P. and kill valves. Thus, the needed operating volume for the incident may have been 30.4 gallons (28.0 gals. from Table F-2 plus 3.4 gals. for another VBR’s ST Locks). This value is slightly above the ES ‘realistic’ design case. Accumulator: required operating pressures The operating pressure requirement for each BOP item is normally 1,500 psig, except the BSR, whose requirement for a shearing operation is a function of the drill pipe to be sheared and the wellbore pressure. A Cameron engineering bulletin provides formulas to calculate the maximum shearing pressure based on actual testing.188 Also, actual shear test data for the 5½" pipe essentially matches the calculated pressure. ES was unable to locate any actual shear tests for the 6-5/8" pipe. Table H-3 shows the design operating pressure for two of the drill pipe sizes used in the DWH Macondo drilling. The 5½" size was in the BOP at the time of the incident, while 6 5/8” size was used during much of the drilling phase. Drill pipe size, weight, & grade Wellbore pressure at BOP Fluid pressure to shear, psig (EB 702D) Comments 5 ½” 21.9 ppf S-135

2200 psia (water) 2,857 ~same as a surface BOP 3700 psia (14.2 ppg mud in riser) 3,084

7990 psia (MASP**) 3,733 For closed annular 6 5/8” 32 ppf S-135

2200 psia (water) 4,175* ~same as a surface BOP 3700 psia (14.2 ppg mud in riser) 4,402*

7990 psia (MASP*) 5,051 For closed annular

** MASP = maximum anticipated surface pressure (from BP’s MMS application for permit to drill the Macondo well); based on 50% gas and 50% mud from originally proposed TD of 20,200 feet and with a formation pressure gradient of 14 ppg. Table H-3: Cameron rated shearing pressures for DWH SBR ram packer. All 6 5/8” shear pressures are above the accumulator maximum capability. Accumulator precharge gas pressures – actual and design The volume of available accumulator fluid to operate the BOP equipment is affected by the initial pressure of the nitrogen precharge gas, which is set/checked by the rig crew for each location as the proper value varies with water depth. If this initial gas pressure is too low, there will not be sufficient hydraulic pressure and volume to shear the pipe. The Transocean Well Control Manual requires that subsea accumulator bottles (in 4,500/5,000 psi systems) be precharged with nitrogen gas to 1,500 psig plus water depth hydrostatic (@0.445 psi/ft) and with temperature compensation (time of measurement to temperature at the sea floor). For Macondo, this equated to 3,725 psig at 39º F. (sea floor). The manual also notes, “designated shear ram bottles may be precharged higher to maximize the minimum amount of pressure to shear drillpipe.” There were two sets of subsea accumulators on the DWH, one on the lower BOP stack for the HP BSR function, and another on the LMRP to assist with all other functions.

188 Cameron Engineering Bulletin. Shearing Capabilities of Cameron Shear Rams, EB 702 D Rev B9, January 21, 2008.

CSB-FINAL REPORT-BOP(06-02-2014)

Page 67 of 83

U.S. Chemical Safety Board By Engineering Services, L.P. Michoud testing (1/26/2011) found three of the four LMRP bottles with precharge gas pressures of 3,400 to 3,425 psig (@46ºF). The pre-charge in bottle #1 was a low 1,225 psig, suggesting a significant leak; it is unknown when or why that leak might have occurred. The average of the other three bottles was 3,408 psig, which adjusts to 3,366 psig at 39ºF subsea temperature (using real nitrogen gas properties), 359 psi less than the Transocean manual value. Precharge gas pressure (psig) in bottle # Ambient temperature, ºF. 1 2 3 4 Avg. high low average (1225) 3425 3400 3400 3408 50 42 46

3581* Adjusted to 60ºF. standard

3366* Adjusted to 39ºF. subsea

Table H-4: Measured LMRP Accumulator Precharge Gas Pressures – 1/26/2011189

ES believes that the LMRP bottle performance was not a contributing factor to the incident because the surface accumulators had available fluid, and the large diameter rigid conduit line was sufficient, without LMRP bottle assistance, for the annular and VBR functions. ES found no evidence that these functions had insufficient power fluid. However, the LMRP precharge data is useful in helping to judge what pressure the rig crew used for the reported BOP accumulator bottle gas pressure check prior to running the BOP subsea, for which ES found no numerical record.190 For the BOP bottles, DNV made measurements on three dates at Michoud, shown in Table H-5.

Precharge gas pressure (psig) in bottle # Ambient temp. - ºF.

1 2 3 4 5 6 7 8 Avg. high low Avg. 12/22/2010 3,900 3,850 3,800 3,800 3,700 3,600 3,700 3,875 3,778 73 61 67 1/25/2011 3,800 3,725 3,650 3,650 3,550 3,425 3,575 3,725 3,638 60 54 57 1/27/2011 3,600 3,750 3,700 3,725 3,650 3,500 3,675 3,825 3,678 57 47 52

Adjusted to: 60ºF. standard temperature To 39ºF. subsea 12/22/2010 3,822 3,773 3,727 3,727 3,637 3,529 3,637 3,798 3,706 3,412 1/25/2011 3,833 3,757 3,682 3,682 3,581 3,454 3,606 3,757 3,669 3,476 1/27/2011 3,685 3,839 3,788 3,813 3,736 3,582 3,762 3,916 3,765 3,618 Average 3,780 3,790 3,732 3,741 3,651 3,522 3,668 3,824 3,713 3,502 Table H-5: Measured BOP Accumulator Precharge Gas Pressures – 1/26/2011191 Adjusted to a standard 60ºF. temperature, the average precharge gas pressures on each date were 3,706 psig, 3,669 psig, and 3,765 psig. The values for the last set indicate no leakage over the time period, within the accuracy of the data. ES believes that the DNV reported temperatures, which were the ambient high and low for the day, are not reliable measures of the actual gas temperature contributing to the variation; bottle surface temperature measurements should have been made on each bottle at the time of its test. Adjusted to the subsea temperature of 39ºF, the average precharge was 3,502 psig.

189 DNV report, Volume 2, March 19, 2010, E-8 190 Ibid, F-68. 191 Ibid, E-8

CSB-FINAL REPORT-BOP(06-02-2014)

Page 68 of 83

U.S. Chemical Safety Board By Engineering Services, L.P. With no leakage during the test period, ES assumes there was no gas leakage over the 7-8 month period from the start of the well and the incident to the testing dates. Also, the results indicate the BOP bottles had a slightly higher precharge pressure as the LMRP bottles (3,502 vs. 3,366 psig); a higher value is allowed by the Transocean manual. If the subsea supervisor did use Transocean’s required 3,725 psig LMRP precharge, the test measurements imply a pressure loss of 317 psi, which is 40 psi/month, or 0.1% per month. If the BOP bottles had the same leak rate, the implication would be the original BOP accumulator precharge gas pressure could have been about 3,800 psig. The following accumulator performance analyses considers both 3,500 psig (As-is case) and 4,000 psig (Sensitivity case). Required operating pressure to shear 5 ½” drill pipe A Cameron Engineering Bulletin provides formulas to calculate the maximum shearing pressure.192 The shearing pressure must be adjusted for water depth and for BOP pressure at the time of shearing. Table H-6 shows the calculated shearing pressures for the 5½" drill pipe used on April 20. Cases for several BOP pressure conditions are shown. BOP pressure condition BOP pressure, psia Shear pressure, psig (Cameron rating) Annular open with 14.2 ppg mud (well plan) 3,700 3,084 Annular closed; BOP at MASP193 7,990 3,733 Estimated during incident 1,200 2,706 If upper annular had sealed when closed. 8,550 3,818 Table H-6: 5 ½” drill pipe shear pressures with SBR ram packer From a well planning and accumulator design perspective, the first two rows are important, regarding whether to assume an annular is open or closed holding pressure during a well control event. MMS rules required that BP submit documentation showing the BSR had the ability to shear the drill pipe in the hole. However, BP failed to submit such a document, and the MMS failed to recognize this omission at the time.194 ES does not know which method BP used. The third row is the ES estimate of BOP pressure at the time the BSR closed during the incident with a failed upper annular, and has a shearing pressure less than the two design options. However, if the DWH upper annular had sealed, the fourth row for a 8,550 psia shut-in pressure (calculated from real time drill pipe pressure) shows a rated shearing pressure of 3818 psig, much greater than the 3,084 psig requirement from the well plan 14.2 ppg mud in the top row. If this had been the situation, as will be shown in the following sections on the DWH accumulator capability, the BSR would likely not have sheared even a centered 5 ½” drill pipe. The incident demonstrates the need to design to MASP, a requirement that has been added by BSEE since Macondo.

192 Cameron Engineering Bulletin EB 702 D Rev B9 Shearing Capabilities of Cameron Shear Rams, January 21, 2008 193 MASP, Maximum Anticipated Surface Pressure; for Macondo = 7,990 psi, from BP’s MMS Application for Permit to Drill for MC 252 (5/13/2009 APD Worksheet). MASP based on “a column of 50% gas & 50% liquid back to mudline” 194 DOI Report, 160.

CSB-FINAL REPORT-BOP(06-02-2014)

Page 69 of 83

U.S. Chemical Safety Board By Engineering Services, L.P. Pressure/volume performance curve: with As-is precharge gas pressure This section looks at the accumulator performance from a pre-drill design perspective. First, using the As-is 3,500 psig precharge gas pressure, the green line in the Figure H-2 shows how the accumulator pressure declines from the initial hydraulic fluid charge of 5,000 psig as gallons of fluid are delivered, which this report will refer to as the PV curve.195 The magenta line shows that the delivery capacity is 25 gallons to have 3,733 psig remaining closing pressure, needed for the MASP wellbore pressure design case. For the lower 14.2 ppg mud design case, 41 gallons can be delivered at the lower 3,084 psig needed pressure. The more conservative MASP design basis has 36% less volume capability.

Figure H-2 –Surface equivalent pressure versus accumulator fluid volume delivered -- with As-is gas initial precharge pressure of 3,500 psig

195 The PV curves in this report were calculated using the API 16D BOP Accumulator Sizing and Performance Tool computer program, version 1.03.

CSB-FINAL REPORT-BOP(06-02-2014)

Page 70 of 83

U.S. Chemical Safety Board By Engineering Services, L.P. Table H-7 applies these delivery volumes for the two design BOP pressure bases. The API-recommended design factor is met for the wellbore pressure of 14.2 ppg (and lower). The high MASP wellbore pressure case is not met. Under the API BOP standard 16D, the design factor should be at least 1.1.196

Volume design factors, As-is precharge BOP design pressure case ‘maximum’ (37.8 gals.) ‘realistic’ (28.0 gals.) MASP 0.7 0.9 14.2 ppg mud 1.1 1.5 Table H-7: Volume design factors – As-is precharge (API at least 1.1) At the time of the Macondo drilling, the MMS regulations required shear rams to be able to shear the drill pipe in use, but they did not specify a BOP pressure design standard. ES was not able to find a documented industry standard on the design basis. A logical design assumption could be that the annular rams above the BSR will be open before actuating a BSR, so that the pressure would be the mud hydrostatic, 14.2 ppg in the case of Macondo. A more conservative assumption would that an annular could be closed, giving MASP as the design pressure for the BSR to overcome, requiring more precharge pressure and potentially additional accumulator bottles.

196 API Specification 16D “Control Systems for Drilling Well Control Equipment and Control Systems for Diverter Equipment,” 2nd Edition, Table 2, Method C for rapid discharge systems, July 2004.

CSB-FINAL REPORT-BOP(06-02-2014)

Page 71 of 83

U.S. Chemical Safety Board By Engineering Services, L.P. Pressure/volume performance curves: with Sensitivity case precharge pressure Figure H-3 shows the same results using the sensitivity case precharge of 4,000 psig. The delivered pressures are 100-150 psi higher than the as-is case.

Figure H-3: Surface equivalent pressure versus accumulator fluid volume delivered -- with Sensitivity case precharge pressure of 4,000 psig Table H-7a shows the effect on design factors, compared to Table H-7, is positive but minor.

Volume design factors, Sensitivity precharge: Wellbore Pressure Case ‘maximum’ (37.8 gals.) ‘realistic’ (28.0 gals.) MASP 0.7 1.0 14.2 ppg mud 1.2 1.6 Table H-7a: Volume design factors - Sensitivity precharge (API at least 1.1)

CSB-FINAL REPORT-BOP(06-02-2014)

Page 72 of 83

U.S. Chemical Safety Board By Engineering Services, L.P. Pressure/volume performance curves: Cameron drawing precharge A Cameron drawing, “Stack Flow Diagram,” shows a precharge table. For 5,000 feet of water depth, it lists 5,500 psig for these accumulators.197 The operating conditions that this value is based on are not described. This precharge pressure would deliver accumulator fluid delivery pressures shown in Figure H-4.

Figure H-4: Surface equivalent pressure versus accumulator fluid volume delivered -- with Cameron drawing precharge pressure of 5,500 psig These final delivery pressures are ~350 psi higher than the As-is case of Figure G-2. Table H-7b shows the resulting design factor exceeds API for both realistic design cases and for the maximum design case with 14.2 ppg mud. The design factors are about 20 percent more conservative than the As-is and Sensitivity cases.

Volume design factors, Cameron precharge Wellbore Pressure Case ‘maximum’ (37.8 gals.) ‘realistic’ (28.0 gals.) MASP 0.9 1.2 14.2 ppg mud 1.4 1.9 Table H-7b: Volume design factors – Cameron precharge (API at least 1.1)

197 DNV Report, Volume 2, Appendix B, Cameron Controls drawing Stack Flow Diagram No. SK-122124-21-04 and -05 (TRN-USCG_MMS-00042587).

CSB-FINAL REPORT-BOP(06-02-2014)

Page 73 of 83

U.S. Chemical Safety Board By Engineering Services, L.P. Summary of shearing pressure cases and the effect of larger drill pipe Table H-8 shows whether the DWH accumulator could reliably shear pipe for the various BOP pressure conditions and for two precharge levels. For the 5 ½” drill pipe in the BOP, the As-is precharge would not have been able to shear if the BOP pressure was about 8,000 psia or higher.

BSR reliably shears with precharge* of: Drill pipe size >BOP pressure condition BOP pressure, psia Shear pressure, psig (Cameron rating) 3500 psig As- is 5500 psig Cameron chart 5½" 21.9 ppf S-135

Annular open with 14.2 ppg mud 3,700 3,084 Yes Yes Annular closed: BOP at MASP 7,990 3,733 No Yes

Estimated during event

1,200 2,706 Yes Yes if upper annular had sealed when closed 8,550 3,818 No Yes 6 5/8" 32 ppf S-135

Annular open with 14.2 ppg mud 3,700 4,402 No No Annular closed: BOP at MASP 7,990 5,051 No No

Table H-8: Drill pipe shear pressures with SBR ram packer

MMS rules required that BP submit documentation showing the BSR had the ability to shear the drill pipe planned to be across the BOP. However, BP failed to submit such a document, and the MMS failed to recognize this omission prior to the incident.198 As a consequence, ES does not know what size pipe was the basis for the Macondo well. From DDR reports, it is clear that 6 5/8" pipe that was used for most of the drilling phase.199 Table H-8 also shows shearing capability for the larger pipe. The required shearing pressures of 4,402 and 5,551 psig are well above the 4,000 psig pressure regulator setting of the accumulator system. The BSR could not have reliably sheared it regardless of precharge pressure (5,500 psig is a practical limit for the 6,000 psig MWP bottles, providing allowance for ambient temperature increase while at the surface).

198 DOI Report, 160. 199 IADC Daily Drilling Reports, Deepwater Horizon, February 16, 2010 to April 8, 2010.

CSB-FINAL REPORT-BOP(06-02-2014)

Page 74 of 83

U.S. Chemical Safety Board By Engineering Services, L.P. Accumulator precharge pressure effect on design factor Prior to running the BOP, the crew must select a precharge that will provide the required operating volume and pressure (from previous section) in the water depth of the well. Figure H-5 shows the design factors for various cases, with the API minimum being 1.10.

Figure H-5: Accumulator design factors versus gas precharge pressure for various cases Essentially all 14.2# mud cases (annular open during BSR operation) exceed the API standard of 1.1. If the annular is closed with a large amount of gas in the well (the MASP case), the ‘realistic’ design can be designed using a precharge of at least 5,000 psig, somewhat less than the Cameron drawing value. If more volume is needed to close additional ST locks and/or choke and kill valves, then the API 1.1 factor cannot be met without additional bottles.

CSB-FINAL REPORT-BOP(06-02-2014)

Page 75 of 83

U.S. Chemical Safety Board By Engineering Services, L.P. Deadman and Autoshear Tests: accumulator performance data (Michoud) DNV function tested the two automatic BSR systems at Michoud at two precharge levels: the original As-is pressure and then after bleeding the precharge gas down to 1,300 psig to give more realistic performance in the surface condition.

Precharge gas pressure case

‘As-is’ (3,713 psig) ‘Reduced’ (1,300 psig) System tested AMF* Autoshear Autoshear Autoshear AMF* AMF* Test # 1 2 3 4 5 6 Date (2011) Feb. 7 Feb. 8 Feb. 11 Feb. 16 Feb. 17 Feb. 18 Fill volume, gals. 210.35** 129.6 408 443.8 458 446 Start pressure 5,000 5,000 5,000 4,900 4,975 5,000 Time to close, sec. 23 28 26 26 24 24 Final accumulator pressure, psig 4,475 4,500 4,000 3,882 3,915 3,900 volume to open 26.4 28.1 29.9 13.25* 25.3 n/a volume to close*** 25.6 25.6 25.6 25.6 25.6 25.6 if ST lock 3.4 3.4 3.4 0 0 0 Total volume to close 29.0 29.0 29.0 25.6 25.6 25.6

**suspect data point; *** ‘volume to open’ is based on Feb. 18 test, the only good measurement of this parameter. Table H-9: Autoshear and AMF deadman function test data

CSB-FINAL REPORT-BOP(06-02-2014)

Page 76 of 83

U.S. Chemical Safety Board By Engineering Services, L.P. Figure H-6 has three pressure versus volume (PV) curves on it. The lower dashed line is operating in 5,000' water depth. The dashed and dotted lines show the dramatic effect of water depth.

Figure H-6: BOP Accumulator function tests at Michoud After running tests with the as-is precharge, testers reduced the precharge to 1,300 psig to move the PV curve closer to the deep water behavior, as shown by the magenta solid line. It is not possible to exactly match the deepwater curve with surface testing. In the tests, the accumulator pressure was measured immediately after the BSR closed. The data points are plotted with a BSR closed volume of 25.6 gallons (measured in only the February 18 test due to procedural difficulties). This measured volume is a slightly higher than the Cameron data sheet value of 24.6 gallons; the reason for the difference is unknown, but it could be caused by some air in the hydraulic system. The accuracy is adequate for this analysis. As plotted, the first three tests had to also close the BSR ST lock (design volume of 3.4 gallons) for a total volume of 29 gallons. The ST lock was bypassed for the other three tests, plotted at 25.6 gallons. The ‘As-is’ and ‘Reduced’ precharge test data points all fall somewhat above their respective PV curves (color coded green and purple). This indicates that the bottles had at least their nameplate volume of 80 gallons each and were not malfunctioning. The values are above the calculated curves is due to one or more of the following reasons: As specified in API 16D, these PV curves are based on gas expansion adiabatic cooling with no reheating from the ambient air. This expansion cooled the gas from ~60ºF to 32ºF (calculated, not feasible to measure). After test closure, the pressure was observed to increase 50-100 psi/minute due to reheating. The DWH bottles may be slightly larger than the nominal 80 gallons size.

CSB-FINAL REPORT-BOP(06-02-2014)

Page 77 of 83

U.S. Chemical Safety Board By Engineering Services, L.P. The actual BSR closing volume may be somewhat less than the single DNV measurement of 25.6 gallons used in the above calculation (See Table F-9 note). Cameron reports a design volume to close of 24.6 gallons, but that does not include any allowance for fluid compression in the hoses, etc. For the one test with a particularly high pressure point, there were operational complications that may have affected the reading, and it may not be valid test point. Quantitatively, the measured pressures were generally about 100 psi higher than adiabatic values, which may be viewed as an additional factor of safety. BOP accumulator precharge: Transocean and BP standards ES reviewed various documents to determine both Transocean’s and BP’s standards for setting precharge pressures. The Transocean Well Control Handbook calls for subsea accumulators to be precharged to “1500 psig plus hydrostatic and temperature compensation,”200 which would be 3,725 psig, close to the as-is measured value. If the subsea engineer did the temperature compensation, the as-is measured values should have been about 4,000 psig with no leakage. The Transocean Handbook also states, “Designated shear ram bottles may be precharged higher to maximize the minimum amount of pressure to shear drillpipe.” ES did not find any document or records indicating how much more that amount should have been or was for the DWH at Macondo. The BP Well Control Manual states, “Accumulator pre-charge pressure shall be recorded on the (Accumulator Closing Test) worksheet.”201 That worksheet presumably sank with the rig. It also states, “The working fluid volume of BOP accumulators and the BOP closing times shall comply with API RP 53 and the BP well control manual.”202 The 3rd Edition (March 1997) of API RP 53, in effect at the time of the Macondo well, did not address the Rapid Discharge type of accumulator system applicable to the BOP accumulators. API Specification 16D does address this system, but technically only applies to equipment manufacture. (A 4th Edition of API 53 was published in November 2012).203 ES could not find any documentation describing design basis for the operational fluid capacity the accumulator system was designed for (e.g., number of ST locks, choke & kill valve operations). Also, the wellbore pressure basis (riser mud weight vs. MASP) affects the volume/pressure supply requirement for the BSR. In addition to an original design matter, it is a management of change issue: the BOP modifications that added the choke & kill valves to the AMF deadman and autoshear backup systems. And as an ongoing operational matter, a BOP accumulator precharge pressure must be selected for each well water depth and maximum mud weight/MASP criteria.

200 Transocean Well Control Handbook, Section 9, subsection 3 (BP-HZN-C SB00079398), 6. 201 BP Well Control Manual (BP-HZN-CSB00088474), 20. 202 Ibid., 7-7-14, 16. 203 API Standard 53, “Blowout Prevention Equipment Systems for Drilling Wells,” November 2012.

CSB-FINAL REPORT-BOP(06-02-2014)

Page 78 of 83

U.S. Chemical Safety Board By Engineering Services, L.P. I. Location of Drill Pipe Within BOP The DNV Report contains a clear accounting of the various drill pipe segments that were recovered and an analysis of how they were aligned at the time of the BSR closure. ES concurs. A particularly important DP piece is Segment 1-B-1:

Figure I-1: Drill pipe segment 1-B-1 (left)204

Figure I-2: Laser scan image of segment 1-B-1205 This segment was located directly below the upper annular (UA) at the time of the BSR closure. The extensive flow erosion around the upper tool joint area, extending up 2", was adjacent to the UA packer.

204 DNV Report, 90. 205 Ibid., 91.

CSB-FINAL REPORT-BOP(06-02-2014)

Page 79 of 83

U.S. Chemical Safety Board By Engineering Services, L.P. Adding segment 1-B-1 to adjacent segments 1-B-2, 84, and 83 gives a pipe section of 21 feet length extending below the UA with its bottom located at the top of the BSR. As detailed in the DNV Report, the markings and shape of the bottom of this section show that the drill pipe had been, in fact, sheared by the BSR. Further, the pipe was sheared while it was essentially against, or near, the BOP wall on the kill side of the BOP. (DNV reports this side was oriented to the North.)

Figure I-3: Drill pipe layout in BOP206

206 DNV Report, 95.

CSB-FINAL REPORT-BOP(06-02-2014)

Page 80 of 83

U.S. Chemical Safety Board By Engineering Services, L.P. J. Top Drive Position at Time of Explosion Real-time data indicates that at the time of the explosion, the drill pipe was supported by the top drive, which was located 26' above the rig floor, where the driller had placed it several hours earlier. At such times, Transocean practices call for the drill pipe to be positioned with a tool joint above the blind shear ram. K. Change in Length for Drill Pipe Buckling Above the BOP High internal pressure also caused the drill pipe to buckle in the riser above the BOP, creating an uplift of the drill pipe. The equations below207 were evaluated above the BOP using 100' depth increments to consider the variation of pressures, axial force, and drill pipe size. The result is 4', with top of buckled helix at about 3,000' depth. Helix pitch= π (8 E I / Fs)½ (I-1) Helix amplitude, R = (OD of drill pipe tool joint – ID of riser) / 2 (I-2) Change in length due to buckling = -L Fs R2 / ( 4 E I) (I-3) Change in length due to ballooning = 2 μ L F /( E (γ^2-1)) (I-4) Change in length due to axial force = L F / (E A) (I-5) Where L = length

A = wall area = ∏ (OD2 - ID2) / 4 (I-6)

F = axial force; Fs = effective compression

μ = Poisson ratio

E = Young’s Modulus

γ = OD/ ID ratio (I-7)

I = bending moment of inertia = π (OD4 - ID4) / 64 (I-8)

207 Stan A. Christman, Casing Stresses Caused by Buckling of Concentric Pipes, SPE 6059 (1976).

CSB-FINAL REPORT-BOP(06-02-2014)

Page 81 of 83

U.S. Chemical Safety Board By Engineering Services, L.P. L. Drill Pipe Separation Above the Upper Annular DNV forensic analysis indicates that the drill pipe was eroded, as shown in figure below. The pipe had parted in the riser immediately above the upper annular.208 The pipe failure was in axial tension, as indicated by the red circle.

Figure L-1: Laser scan image of segment 1-B-1 (right side is top)209

208 DNV Report, 91. 209 Ibid.

CSB-FINAL REPORT-BOP(06-02-2014)

Page 82 of 83

U.S. Chemical Safety Board By Engineering Services, L.P. ES believes that the erosion occurred after the BSR closed on the drill pipe and ruptured it, allowing flow to resume up through the upper annular (mostly closed, but not sealing). High flow impinged on the drill pipe right above. Assuming that the pipe was still supported by the rig, whatever tension existed was sufficient to pull the pipe apart. After the separation and subsequent erosion failure of the pipe in the BSR, the 21' pipe segment (pieces 1-B-1, 1- B-2, 84, and 83) was ultimately pushed up through the annular by flow, leading to the side-by-side drill pipes found in the riser above the annular during intervention and later in the recovered riser section. Analysis made by DNV, with their figure reproduced below.

Figure L-2: Schematic Diagram of Sequence of Drill Pipe Segment Movement210

210 Ibid, 95. Portion of DNV report Figure 55.

CSB-FINAL REPORT-BOP(06-02-2014)

Page 83 of 83

U.S. Chemical Safety Board By Engineering Services, L.P. M. Rig Movement After Explosion Rig Movement by Environmental Forces 0 10 20 30 40 50 0 2 4 6 8 10 Elapsed time, minutes Movement, feet High side case: 10 kt. wind, 0.2 kt. current (30 kips force) Base case: 4 kt. wind, 0.1 kt. current (5 kips force)

(Base case environmental data from BP report211; ES estimated rig mass 50,000 tons) Figure M-1 – Rig Movement by Environmental Forces For the Base case in 5 minutes, the rig lateral movement is only 2', and the associated distance change from the rig to the BOP is essentially zero. For even a 50-foot lateral movement from the High-side case at 10 minutes, the rig to BOP distance change is less than 4", a minimal lifting of the dill pipe tool joint into the upper annular. For the 714' rig offset that was reported at 23:18 on the day after the explosion,212 (13.4% of water depth), the increased distance to the BOP is about 48'. This works out to an average riser angle was 7.5º. Since the riser was likely bowed slightly upward from buoyancy effects (riser buoyancy modules plus riser full of gas and oil), the riser length change (taken up by the telescoping joint) would have been slightly more than 48’.

211 BP Report, Appendix V Dispersion Analysis: i. 212 DNV report Vol. 2 , Timeline F-111

FD06469 | 2014_美国_Tesoro_Martinez_Sulfuric_AcidSpill-_Tesoro_Martinez_Sulfuric_Acid_Spill__最终报告.pdf

分类:06_境外及港澳台调查报告 | 年份:2014 | 地域: | 严重程度: | 场所: | 起火原因: | 来源格式:pdf

JULY 2016

CSB • Tesoro Martinez Case Study

Tesoro Martinez Refinery Process Safety Culture Case Study Martinez, California February 12, 2014 and March 10, 2014 Sulfuric Acid Release Incidents No. 2014-02-I-CA

Investigation Summary:

A strong process safety culture is necessary to help prevent process safety incidents and worker injuries. The CSB investigated two sulfuric acid releases that occurred at the Tesoro Martinez refinery in Martinez, California. The investigation found that a weak process safety culture created conditions conducive to the recurrence of sulfuric acid incidents that caused worker injuries over several years.

2 CSB • Tesoro Martinez Case Study The US Chemical Safety and Hazard Investigation Board (CSB) is an independent Federal agency whose mission is to independently investigate significant chemical incidents and hazards and effectively advocate the implementation of the resulting recommendations to protect workers, the public, and the environment. The CSB is a scientific investigative organization; it is not an enforcement or regulatory body. Established by the Clean Air Act Amendments of 1990, the CSB is responsible for determining the root and contributing causes of accidents, issuing safety recommendations, studying chemical safety issues, and evaluating the effectiveness of other government agencies involved in chemical safety. More information about the CSB is available at www.csb.gov. The CSB makes public its actions and decisions through investigative publications, all of which may include safety recommendations when appropriate. Examples of the types of publications include: CSB Investigation Reports: formal, detailed reports on significant chemical accidents and include key findings, root causes, and safety recommendations. CSB Investigation Digests: plain-language summaries of investigation reports. CSB Case Studies: shorter than a full investigative report, case studies present investigative information from specific accidents and include a discussion of relevant prevention practices. CSB Safety Bulletins: short, general-interest publications that provide new or timely information intended to facilitate the prevention of chemical accidents. CSB Hazard Investigations: broader studies of significant chemical hazards. Safety Videos: high-quality outreach products that result in improved worker and environmental protection. CSB publications can be downloaded at www.csb.gov or obtained by contacting: US Chemical Safety and Hazard Investigation Board Office of Congressional, Public, and Board Affairs 1750 Pennsylvania Ave NW, Suite 910 Washington, DC 20006 (202) 261-7600 No part of the conclusions, findings, or recommendations of the CSB relating to any chemical accident may be admitted as evidence or used in any action or suit for damages. See 42 U.S.C. § 7412(r)(6)(G).

CSB • Tesoro Martinez Case Study 3 Table of Contents Executive Summary ...................................................................................................................................... 5  Key Findings ............................................................................................................................................. 5  Safety Culture ....................................................................................................................................... 5  Regulator Inspections and the use of Indicators ................................................................................... 6  1.0  Background Information ................................................................................................................... 7  1.1  Refinery History ............................................................................................................................ 8  1.2  Alkylation and the Role of Sulfuric Acid ..................................................................................... 8  2.0  Introduction ....................................................................................................................................... 9  2.1  The Cultural Approach to Safety .................................................................................................. 9  2.2  Relevant Accident History at the Refinery ................................................................................. 10  3.0  February 12, 2014 Incident ............................................................................................................. 13  3.1  Incident Description .................................................................................................................... 13  3.2  Technical Analysis ...................................................................................................................... 15  3.3  Analysis of Sulfuric Acid Sampling System Design .................................................................. 17  3.3.1  Tesoro Martinez Refinery Sample Systems ........................................................................ 17  3.3.2  Tesoro Los Angeles Refinery Sample Systems .................................................................. 22  3.3.3  Company X Refinery Sample Systems ............................................................................... 23  3.3.4  Company Y Refinery Sample Systems ............................................................................... 24  3.4  Organizational Analysis .............................................................................................................. 25  3.4.1  Equipment Testing and Postponing Upgrades .................................................................... 25  3.4.2  PPE Unavailability and Insufficiency ................................................................................. 25  3.4.3  Production vs. Safety .......................................................................................................... 26  3.4.4  Caustic Sampling Issues ...................................................................................................... 26  4.0  March 10, 2014 Incident ................................................................................................................. 28  4.1  Incident Description .................................................................................................................... 28  4.2  Technical Analysis ...................................................................................................................... 31  4.3  Organizational Analysis .............................................................................................................. 33  4.3.1  Pressure to Expedite Maintenance Work ............................................................................ 33  4.3.2  Blinding and Isolation Requirements ................................................................................. 35  4.3.3  Lessons from Previous Incidents Not Learned ................................................................... 39  5.0  Tesoro Martinez Refinery Safety Culture Analysis ........................................................................ 42  5.1  Martinez Refinery Safety Culture Assessments .......................................................................... 42  5.1.1  Introduction ......................................................................................................................... 42  5.1.2  Industrial Safety Ordinance Safety Culture Requirements ................................................. 43 

4 CSB • Tesoro Martinez Case Study 5.1.3  History of Safety Culture Assessments ............................................................................... 44  5.2  Management Commitment to Worker Safety ............................................................................. 50  6.0  The Role of the Regulator ............................................................................................................... 57  6.1  Proactive and Preventive Inspections ......................................................................................... 57  6.2  Process Safety Indicators and Incident Investigations ................................................................ 58  7.0  Conclusion ...................................................................................................................................... 59  Appendix – Causal Analysis AcciMap ....................................................................................................... 60 

CSB • Tesoro Martinez Case Study 5 Executive Summary The US Chemical Safety Board (CSB) investigated two process safety incidents at the Tesoro Martinez refinery in Martinez, California that involved sulfuric acid injuries to workers. On February 12, 2014, a mechanical integrity failure released sulfuric acid in the alkylation unit, which burned two Tesoro Martinez refinery employees. Approximately 84,000 pounds of sulfuric acid were released during the incident. On March 10, 2014, sulfuric acid sprayed and burned two contract workers while they removed piping in the same alkylation unit. The CSB found that this second incident shared similar causation with a 1999 incident at the same refinery, then called the Avon refinery, owned by the Tosco Corporation, that resulted in four fatalities. Similarities between the two incidents suggest that the Tesoro Martinez refinery did not effectively continue to implement or communicate important safety lessons from the 1999 Tosco incident. The following case study highlights the details of the incidents and their technical and organizational causes. This case study also examines process safety culture (“safety culture”) weaknesses through the evaluation of the Tesoro Martinez refinery’s previous sulfuric acid incidents, worker statements, gaps in safety standards, deviations from established procedures and practices, and past efforts to assess and strengthen site safety culture. The CSB urges all refineries to review the key findings and conclusions for application to their own facilities, and to evaluate their safety culture, process safety management systems, and corporate safety oversight for potential improvements. Although primary safety responsibility rests with the companies who own and operate facilities in high hazard industries, regulators are well positioned and empowered to help direct positive change in matters concerning safety. In addition, regulators can be more effective through robust preventive inspections and audits to encourage industry to adopt safer practices and to reduce risks to as low as reasonably practicable, or ALARP. Thus, with the goal of preventing future incidents, the report concludes by reinforcing the need to strengthen the regulatory oversight of petroleum refineries in the state of California. Key Findings The CSB’s investigation of the February and March 2014 sulfuric acid incidents identified key findings related to safety culture, process safety indicators, and the continued need for a proactive regulator to conduct preventive inspections. Safety Culture A strong safety culture is necessary to help prevent process safety incidents, including worker injuries from sulfuric acid releases. The safety culture at the Tesoro Martinez refinery created conditions conducive to the occurrence and recurrence of process safety incidents that caused worker injuries at the refinery over several years. The February and March 2014 incidents are part of a lengthy pattern of sulfuric acid release-related injuries workers suffered at the facility since 2010, with many commonalities that suggest the refinery is not effectively implementing safety lessons from accidents. They are also illustrative of safety culture issues within the Tesoro Martinez refinery, such as:

6 CSB • Tesoro Martinez Case Study  Minimization of the seriousness of the February 12, 2014 process safety incident involving chemical burns to workers and a loss of primary containment;  Routine alkylation unit worker exposure to hazardous vapors, acids, and caustic;  Taking inherently safer acid sample systems out of service;  Reliance on inadequate temporary alkylation unit equipment or other workarounds;  Failure to provide alkylation unit workers with necessary and functional personal protective equipment (PPE);  Establishment of site-specific safety policies that were less protective than corporate standards and established industry good practice;  Permit readiness program deficiencies resulting in perceived pressure on alkylation unit workers to expedite work;  Failure to take corrective actions to address findings from refinery safety culture assessments;  Ineffective incorporation and communication of lessons learned from previous safety incidents;  Withdrawal from safety programs that workers believed were effective;  Reports of pressure on alkylation unit workers to reduce cost by running at lower acid concentrations, but without adequate technical controls and infrastructure needed to operate safely at the desired conditions;  Staffing resource limitations due to numerous worker injuries and workforce reductions; and  Reports of increased management pressure on alkylation unit workers to expedite training and qualifications in order to fill gaps in staffing. Regulator Inspections and the use of Indicators An effective, proactive regulator can play a positive role in preventing process safety incidents in addition to a company’s prioritization and implementation of safe practices and procedures. Robust, preventive inspections by the regulator are necessary to identify opportunities to implement good practices, use the hierarchy of controls, and reduce risk to as low as reasonably practicable (ALARP) among other critical tasks. Such inspections could have identified the weaknesses of the sampling stations at the Tesoro Martinez refinery and safer sampling approaches used at other California refineries. In addition, preventive inspections could have identified the weak equipment and pipe opening practices at the Tesoro Martinez refinery. The collection and assessment of a company’s leading and lagging process safety indicators can measure operational performance and promote ongoing safety improvement, leading to the potential for enhanced accident prevention efforts. Prior sulfuric acid exposure incidents at the Tesoro Martinez refinery could have properly been considered leading indicators of an impending serious chemical accident and then triggered preventive inspections and review of the refinery’s safety systems and equipment.

CSB • Tesoro Martinez Case Study 7 1.0 Background Information The US Chemical Safety Board (CSB) investigated two separate sulfuric acid release incidents that occurred in February and March 2014 in the alkylation unit of the Tesoro Martinez refinery in Martinez, California.1 The incidents caused acid burn injuries to four workers and two of these workers each missed over 150 days of work. The February incident also caused a significant release of approximately 84,000 pounds of sulfuric acid from a 100,000-gallon vessel containing sulfuric acid and hydrocarbons.2 Figure 1 below shows the location of the incidents within the refinery.

Figure 1. Overhead photo of the Tesoro Martinez refinery Alkylation Unit showing the approximate location of the February 12, 2014 (yellow star) and March 10, 2014 (red star) incidents. Credit Bing Maps.

1 At the time of these incidents, the CSB was completing its investigation of the multi-fatality Tesoro Anacortes refinery investigation that uncovered numerous safety culture deficiencies, and was assessing the regulatory oversight of petroleum refineries in California through its investigation of the Chevron Richmond refinery (accessed June 20, 2016). 2 Tesoro records indicate that the incident resulted in the release of 84,346 pounds of sulfuric acid and 26 pounds of sulfur dioxide.

8 CSB • Tesoro Martinez Case Study 1.1 Refinery History Tesoro Corporation began in 1968 as a petroleum exploration and production company. In 1969, Tesoro began operating its first refinery near Kenai, Alaska. A Fortune 100 company, Tesoro now operates six refineries in the western United States. These refineries have a combined production capacity of approximately 850,000 barrels per day (bpd).3 The Martinez refinery has been in operation for more than 80 years. Its main products are motor fuels such as gasoline and diesel. Tosco Corporation operated the refinery (known then as Avon) from 1976- 2000, when Tosco sold the refinery to Ultramar Diamond Shamrock which then renamed the Avon refinery the Golden Eagle refinery. Ultramar Diamond Shamrock then sold the refinery to Valero in 2002, and in rapid succession, Tesoro acquired the Golden Eagle refinery from Valero in 2002. In 2013, Tesoro renamed this facility the “Tesoro Martinez Refinery.” 1.2 Alkylation and the Role of Sulfuric Acid The alkylation process takes place in the alkylation unit of a refinery and occurs when isobutane combines with light olefins4 in the presence of a strong acid catalyst5 such as sulfuric acid. Tesoro describes alkylation as one of the most important processes in a modern refinery because it increases gasoline production by combining low value hydrocarbons such as propane and butane to produce a premium gasoline blend stock. The result is high-octane premium gasoline blending component, also known as high-octane alkylate. The alkylation unit’s spent sulfuric acid is highly corrosive, reactive, and can be flammable.6 In the event of contact, sulfuric acid can cause severe skin burns, serious eye damage, and respiratory irritation. To ensure the alkylation unit is operating within its safe operating limit the sulfuric acid concentration (strength) must be controlled, which requires frequent sampling and testing.7

3 See http://tsocorp.com/about-tesoro/locations/ and http://tsocorp.com/about-tesoro/company-history/ (accessed June 14, 2016). 4 Olefins, also known as “alkenes,” are hydrocarbons that contain a carbon-carbon double bond. 5 A catalyst allows a chemical reaction to take place, but is not consumed by the desired reaction. 6 The spent sulfuric acid within the refinery alkylation unit is primarily sulfuric acid but may also contain hydrocarbons, because of chemical processing operations such as intense mixing in the reactor during the alkylation process. 7 Undesired reactions consume the sulfuric acid in the alkylation process. As a result, the acid concentration (strength) is reduced from the fresh acid concentration (approximately 98.5 weight percent) to the final “spent” acid concentration (approximately 90 weight percent). If the acid is not maintained within safe operating limits, then the reactor could suffer an acid runaway. Section 5.2 describes this further.

CSB • Tesoro Martinez Case Study 9 2.0 Introduction 2.1 The Cultural Approach to Safety The CSB identified numerous process safety management system deficiencies in its investigation of the February and March 2014 sulfuric acid incidents at the Tesoro Martinez refinery that were causal to the incidents. This report discusses those in detail throughout the technical and organizational analysis sections, but ultimately seeks to frame many of the issues in terms of process safety culture (“safety culture”) at the refinery. As industrial safety and accident analysis expert Andrew Hopkins states in his book Safety, Culture and Risk, the safety culture perspective “does not replace the system perspective, it augments it. No one is saying, ‘ignore systems, all we need to do is get the culture right’; on the contrary, the right culture is necessary to make safety systems work.”8 Andrew Hopkins continues by noting that there is more attention paid to safety culture today partly because of the “recognition of the limitations of safety management systems as a means of achieving safety.”9 The CSB stated in its BP Texas City investigation report that experts such as Hopkins and James Reason have indicated that “safety culture, risk awareness, and effective organizational safety practices found in high reliability organizations (HROs)10 are closely related, in that ‘[a]ll refer to the aspects of organizational culture that are conducive to safety.’”11 The CSB added that these experts have noted, “safety management systems are necessary for prevention, but that much more is needed to prevent major accidents. Effective organizational practices, such as encouraging that incidents be reported and allocating adequate resources for safe operation, are required to make safety systems work successfully.”12 As such, while the report discusses many of the issues in terms of safety culture, the reader should note and seek to learn from the many systemic issues discussed, as those are imperative to worker safety. As discussed in the CSB’s Tesoro Anacortes refinery investigation report, Andrew Hopkins describes safety culture as “the way we do things around here.”13 Others simply describe safety culture as “how the

8 Hopkins Andrew. Safety, Culture and Risk; The Organisational Causes of Disaster. Sydney, New South Wales: CCH Australia Limited. 2005; p 5. 9 Ibid at p 3. 10 The CSB BP Texas City investigation report describes HROs as “organizations from higher risk sectors such as nuclear power plants, air traffic control, or nuclear aircraft carriers that have developed characteristics such as preoccupation with failure, reluctance to simplify, and mindfulness to operations, which enables them to more successfully manage unexpected events and suffer fewer incidents.” CSB Investigation Report. Refinery Explosion and Fire. BP Texas City. March 2007; p 139. http://www.csb.gov/assets/1/19/CSBFinalReportBP.pdf (accessed June 20, 2016). 11 Ibid. 12 Ibid. 13 CSB Investigation Report. Catastrophic Rupture of Heat Exchanger. Tesoro Anacortes Refinery. May 2014; p

  1. http://www.csb.gov/assets/1/7/Tesoro_Anacortes_2014-May-01.pdf (accessed June 14, 2016). Citing

Hopkins, Andrew. Safety, Culture and Risk; The Organisational Causes of Disaster. Sydney, New South Wales: CCH Australia Limited. 2005; p 7. And Center for Chemical Process Safety (CCPS), Guidelines for Risk Based Process Safety. 2007; p 40. More recently, the CSB identified that the original source of the phrase “the way we do things around here” may come from Marvin Bower’s 1966 book, The Will to Manage. Bower, Marvin, 1966. The Will to Manage: Corporate Success through Programmed Management. McGraw-Hill Book Company,

10 CSB • Tesoro Martinez Case Study organization behaves when no one is watching.”14 The CSB found that specific safety culture weaknesses at the Tesoro Martinez refinery, demonstrated by a history of alkylation unit sulfuric acid incidents, the minimization of the seriousness of process safety incidents, failure to learn from past incidents at the refinery and implement important safety lessons, taking safer sulfuric acid sampling equipment out of service, weak management commitment to robust practices and procedures, and tolerance of worker exposure to unsafe conditions, were causal to both the February and March 2014 sulfuric acid incidents. 2.2 Relevant Accident History at the Refinery Two previous major process safety incidents at the Martinez refinery in 1997 and 1999 resulted in federal investigations. On January 21, 1997, an explosion and fire occurred at the Hydrocracker Unit of the Martinez refinery (then owned by the Tosco Avon refinery). This incident resulted in one fatality, 46 worker injuries, and a community shelter-in-place.15 The EPA and OSHA both investigated this incident. The EPA found in its investigation, among other things, issues surrounding safety culture, including insufficient conditions to support and encourage employees to operate reactors in a safe manner, and inadequate supervision, which both contributed to the incident.16 On February 23, 1999, four workers were fatally injured and one critically injured when a fire occurred in the crude unit at the Avon refinery. Workers were attempting to replace piping attached to a 150-foot tall fractionator tower while the process unit remained in operation. Refinery management failed to formulate a plan to control the known hazards of cutting into piping containing flammable naphtha liquid. During removal of the piping, naphtha released onto the adjacent hot fractionator and ignited. The flames engulfed the five workers. As this report will discuss, although ownership at the refinery changed, some of the unsafe work practices previously identified at the site continued. Tesoro tolerated numerous sulfuric acid worker injuries during the five-year period of 2010 to 2014. These incidents provide evidence of deficiencies in the refinery’s organizational policies and practices governing safe work. The fact that these incidents continued for an extended period demonstrates a culture that does not effectively prioritize worker safety. The CSB found many commonalities that are illustrative of larger safety culture issues and which suggest the refinery is not effectively implementing safety lessons from accidents.

here (accessed June 6, 2016). 14 American Institute of Chemical Engineers (AIChE), Safety Culture: What is at Stake? http://www.aiche.org/ccps/topics/elements-process-safety/commitment-process-safety/process-safety- culture/building-safety-culture-tool-kit/what-is-at-stake (accessed June 14, 2016). 15 EPA. Chemical Accident Investigation Report; Tosco Avon Refinery, Martinez, California. November 1998; p vi. http://nepis.epa.gov/Exe/ZyPDF.cgi/10003A2E.PDF?Dockey=10003A2E.PDF (accessed June14, 2016). 16 Ibid at viii. CSB • Tesoro Martinez Case Study 11 For example, the CSB identified a history of recent sulfuric acid worker injuries listed below:

  1. In June 2010, a contract worker received a chemical burn from a sulfuric acid release

during nonroutine maintenance17 to remove a piping component connected to an alkylation reactor. Tesoro's investigation identified the cause of this incident to be improper personal protective equipment (PPE) due to a belief that sulfuric acid was not present at the time. Similar to the March 10, 2014 incident this piping should not have contained sulfuric acid; instead, it is intended to provide butane to the mechanical seal for one of the alkylation reactor agitators.

  1. In August 2010, a sulfuric acid leak burned a Tesoro employee when it released from a

piping component located above where the employee was working on an adjacent non- acid piping system.

  1. In October 2010, sulfuric acid burned a contract worker assisting with nonroutine

maintenance to isolate a process vessel when it released from the acid-containing equipment.

  1. In January 2012, a Tesoro worker was injured and transported to the hospital following

an acid release incident from a failed temporary pump. The permanently installed pump in this service was not operable. Rather than repairing the permanent pump, Tesoro opted to install a temporary pump that was not compatible with sulfuric acid as a work- around. According to its incident investigation records, Tesoro installed this temporary pump without a Management of Change (MOC)18 and the pump failed because it was not suitable for sulfuric acid service.

  1. Later in January 2012, a sulfuric acid release burned two contract workers during

nonroutine maintenance while isolating a process vessel in preparation for a larger maintenance activity.

  1. In February 2012, sulfuric acid burned a contract worker during nonroutine maintenance

to replace a valve.

  1. In August 2012, sulfuric acid burned a Tesoro employee when it drained from a hose that

was disconnected above the location where he was working.

17 Nonroutine maintenance refers generically to activities that do not happen frequently and where a procedure does not address the required actions. 18 Under OSHA’s Process Safety Management (PSM) Standard, proposed changes to a process must be analyzed to determine their technical basis, required authorizations, and impact on health and safety. 29 C.F.R. § 1910.119(l) (2012). The EPA’s Risk Management Plan (RMP) Rule also requires Management of Change under 40 C.F.R. § 68.175(i).

12 CSB • Tesoro Martinez Case Study

  1. Later in August 2012, almost eight months after the January 2012 chemical burn injury

from the temporary pump (incident No. 4 above), the hose to the temporary pump failed because it was also not suitable for sulfuric acid service. This incident injured two Tesoro workers. One worker received chemical burns to the face from sulfuric acid and the second worker injured his knee when he slipped on the sprayed acid. The temporary hose remained in service for nearly eight months and was determined after the incident to be incompatible with sulfuric acid.19

  1. Also in August 2012, sulfuric acid sprayed a Tesoro employee while working to mitigate

a piping leak to one of the alkylation unit reactors.

  1. In September 2012, sulfuric acid injured a contract worker when it sprayed from tubing

to one of the alkylation reactors during a nonroutine maintenance activity needed to prepare the reactor for maintenance.

  1. In January 2013, sulfuric acid burned a contract worker while disconnecting a hose that

Tesoro records indicate had not been in sulfuric acid service; unknown to the worker, acid had entered into the hose from an unanticipated source.

  1. In May 2013, sulfuric acid sprayed a Tesoro employee while working on instrumentation

connected to an alkylation reactor. A leaking valve had pressured the system with hydrocarbon and sulfuric acid.

  1. In November 2013, sulfuric acid sprayed a Tesoro employee while preparing sulfuric

acid piping for maintenance following a mechanical integrity failure.

19 Tesoro could have identified and controlled this hazard by performing a MOC or by more thoroughly investigating the January 2012 incident (incident 4 above).

CSB • Tesoro Martinez Case Study 13 3.0 February 12, 2014 Incident 3.1 Incident Description On February 12, 2014, two employees at the Tesoro Martinez refinery in Martinez, California, suffered first and second degree chemical burns while working to put a sulfuric acid sampling system20 in the refinery’s alkylation unit back in service following nonroutine maintenance. As will be further discussed below, concentrated sulfuric acid sprayed two workers following a mechanical integrity failure of a ¾- inch tubing connector adjacent to the acid sampling station. The incident occurred when the operators opened a valve (Figure 2) to return an acid sampling system back to service (Figure 3). Shortly after fully opening this valve, the tubing directly downstream of the valve came apart at the connector, spraying the two operators with acid. The operators immediately went to a nearby safety shower. Until responders were able to isolate the system, acid continued to spray out of the failed tubing for over two hours from a nearly 100,000-gallon acid settler21 that was operating below 100 pounds per square inch gauge (psig) and near the ambient temperature of approximately 50 degrees Fahrenheit (ºF). This resulted in the release of approximately 84,000 pounds of sulfuric acid. At the time of the incident, the two employees were wearing the personal protective equipment (PPE) required by company policy to put the sample system back in service – hard hat, safety shoes, goggles, flame retardant jacket and coveralls, and gloves. This PPE was, however, insufficient to protect against an acid spray injury. Emergency responders transferred the workers by helicopter and ambulance to the UC Davis Regional Burn Center for evaluation and treatment of their sulfuric acid burn injuries. Neither employee returned to work for over 150 days.22 Despite the serious nature of the employee injuries and quantity of hazardous chemicals released from the loss of containment,23 Tesoro challenged the CSB’s

20 A sampling station is industry terminology for the tubing, valves, and other equipment used to obtain a sample of process fluid needed for analysis. This sampling station design at Tesoro Martinez allowed for collection of two samples: one for immediate density analysis by the operator and a second for laboratory analysis to determine the weight percent acid. 21 In brief, the acid settler receives sulfuric acid and hydrocarbon from alkylation reactors. The settler operates full of liquid and provides a low velocity area in order to allow the hydrocarbon and sulfuric acid to separate into separate liquid layers. Liquid enters the settler as an emulsion that gradually separates into a top layer that contains mostly hydrocarbon and a bottom layer that primarily consists of sulfuric acid. 22 One worker returned to work on July 15, 2014 (153 days) and the second worker returned to work on August 4, 2014 (173 days). 23 The American Petroleum Institute (API) applies a “Tier” approach to classify the significance of a process safety event, ranging in decreasing severity from Tier 1 through Tier 4. Tier 1 represents “loss of primary containment” incidents with the “greatest consequence.” The February 12, 2014 incident is a Tier 1 process safety event. The incident resulted in “days away from work” injuries for two workers and released approximately 84,000 pounds of concentrated sulfuric acid, 34,195 pounds per hour for 148 minutes. API. Recommended Practice 754: Process Safety Performance Indicators for the Refining and Petrochemical Industries. April 2010; pp 8-9.

14 CSB • Tesoro Martinez Case Study authority to investigate the incident and failed to preserve key evidence.24 Tesoro corporate officials characterized the incident as a minor personal safety event rather than a process safety incident.25, 26 Based on information – including alkylation unit worker testimony – that the unit was not safe, the California Division of Occupational Safety and Health (Cal/OSHA) required the process to remain shut down from February 18, 2014 until February 28, 2014, when Tesoro completed abatement of the items identified in the order to prohibit use.27 The Cal/OSHA Process Safety Management (PSM) Unit investigated the incident and issued citations totaling $51,450.28 The citations were later reduced to three general and one serious, for a total penalty of $43,400.

Figure 2. Photo showing the tubing that separated (yellow oval) after the valve (red square) was opened in order to return the sample system back to service following maintenance. Two workers were injured from this acid release incident on February 12,

  1. This loss of containment from the open-ended tubing released 84,000 pounds of sulfuric acid.

24 Tesoro did not obtain a sample of the sulfuric acid in the settler as requested by the CSB following the February 12, 2014 incident. The CSB was interested in this sample because investigators learned during the investigation that the physical characteristics of the released acid appeared unusual to witnesses. In addition, Tesoro replaced the agitator coupling for the alkylation reactor Tesoro workers quickly shut down prior to the February 12, 2014 acid release without providing CSB investigators the opportunity to inspect and document its condition. Tesoro workers described an unusual “grinding noise” from this adjacent reactor just prior to the acid release. 25 The CSB investigation report on the 2005 BP Texas City refinery incident emphasized the distinction between personal safety and process safety. Personal safety is commonly described as slips, trips, and fall type incidents. Process safety addresses the control and prevention of fires, explosions, and accidental uncontrolled releases of hazardous substances. Process safety can be further simplified as the management systems that ensure that hazardous chemicals stay inside the pipes and equipment. See http://www.csb.gov/bp-america-refinery-explosion/ (accessed June 14, 2016). 26 The 100,000-gallon acid settler contains a flammable hydrocarbon liquid layer above the sulfuric acid layer. Had the sulfuric acid drained out, the flammable hydrocarbon layer on top of the acid would have followed, likely resulting in an escalation of the incident with the potential for an explosion and fire. 27 Issuing an Order to Prohibit Use is an enforcement action that Cal/OSHA infrequently implements. 28 Cal/OSHA citations included mechanical integrity related to the sample station tubing, PPE required for sampling, and process hazard analysis (PHA) deficiencies related to sampling. Cal/OSHA ultimately withdrew the PHA and mechanical integrity citations.

CSB • Tesoro Martinez Case Study 15

Figure 3. Photo showing the sulfuric acid sampling station at the Tesoro Martinez refinery. The photo on the left shows the sample station just after the February 12, 2014 incident and the photo on the right shows the sample station after repairs were made and the alkylation unit was again operating. Workers informed the CSB that the concrete containment area, clearly visible in the photos above, had badly deteriorated from routine exposure to sulfuric acid. 3.2 Technical Analysis The sample system involved in the February 12, 2014 incident was out of service for maintenance beginning November 26, 2013 due to leaking tubing and an improperly manufactured sample container. Despite the sample system being out of service, the alkylation unit continued to operate as usual. Tesoro technical personnel stated to the CSB that this sample station was not essential to daily operation of the alkylation unit. The alkylation unit technology licensor, however, recommends sampling this acid once per day to verify instrumentation and controls are functioning properly. Tesoro performed maintenance on the sample system on February 10 and 11, 2014, which included replacing the container. Due to maintenance program deficiencies including gaps in planning, documentation, and communication, Tesoro did not effectively repair or leak-test the tubing prior to placing it back in service. The Tesoro Martinez refinery did not require workers to leak-test tubing of this type following repairs.

In an agreement among the CSB, Cal/OSHA, and Tesoro, the CSB commissioned Anamet, Inc., a materials engineering and laboratory testing company, to conduct testing on the failed tubing (Figure 4). The CSB released a technical evaluation report detailing the testing results and conclusions on August 15,

16 CSB • Tesoro Martinez Case Study 2014.29 The report concluded that the sulfuric acid release on February 12, 2014 resulted from the failure of a ¾-inch diameter stainless steel tubing connector that came apart due to insufficient tightening between a tube and a compression joint at the sulfuric acid sampling station.

Figure 4. Photo of the tubing connection that failed and resulted in the February 12, 2014 incident. This photo is from the CSB’s technical evaluation report that determined the compression joint was insufficiently tightened. Following the February 12, 2014 incident, maintenance workers also found an inadequately tightened compression fitting for an adjacent sample station. This tubing connector did not fail during start-up like the other connector, however, because the tubing was wedged against a concrete wall, holding it in place.

29 Anamet, Inc. Examination of a 0.75-Inch Diameter Stainless Steel Tube Compression Joint Involved in the Tesoro Martinez Acid Spill that Burned Two Workers on February 12, 2014. See http://www.csb.gov/assets/1/7/Tesoro_Martinez_Metallurgical_Report.pdf. (accessed June 14, 2016). Figure 11 of this metallurgical report shows a sectioned example of a properly installed compression fitting.

CSB • Tesoro Martinez Case Study 17 3.3 Analysis of Sulfuric Acid Sampling System Design As the CSB discussed in many of its investigation reports, the effective implementation of inherently safer design30 and the hierarchy of controls31 are key to reducing risks and preventing major accidents. In January 2010, the Tesoro Martinez refinery made a substantial financial investment in what the refinery asserted was a more robust, “inherently safer” sampling system, which the refinery then failed to make operable and took out of service.32 On February 12, 2014, workers were putting the older, poorly designed system back into service when the incident occurred. The CSB notes that although the February 12, 2014 incident did not occur during acid sampling, differences in Tesoro Martinez operations and maintenance work practices meant that the workers would have leak-tested the piping and flanges in the sample system that was taken out of service, but not the tubing and fittings in the old system being brought back into service. The Tesoro Martinez refinery management therefore continued to rely on the older sampling system that they acknowledged presented a greater risk to workers.

To learn how other companies that operate refineries with sulfuric acid alkylation units controlled hazards from acid sampling, the CSB requested and received cooperation from two local refineries – Company X and Company Y. The CSB’s review of these companies’ sample systems revealed superior sampling equipment through more effective application of the hierarchy of controls. Both companies’ sample systems emphasized engineering controls (such as more robust piping) in addition to administrative controls (such as PPE). 3.3.1 Tesoro Martinez Refinery Sample Systems Sulfuric acid sampling systems at the Tesoro Martinez refinery routinely exposed operators to avoidable risks. Even when conducted as Tesoro intended, the sampling process generated a hazardous white vapor cloud likely consisting of acid gas and hydrocarbon vapor when the material drained from the acid settler to the process chemical sewer. This poses an obvious respiratory hazard to operators engaged in

30 The Center for Chemical Process Safety (CCPS) defines inherently safer design as the process of identifying and implementing safety in a specific context that is permanent and inseparable from the process. Center for Chemical Process Safety (CCPS). Inherently Safer Chemical Processes – A Life Cycle Approach. 2009; Section 2.2. In the book Guidelines for Engineering Design for Process Safety, the CCPS states “inherently safer design solutions eliminate or mitigate the hazard by using materials and process conditions that are less hazardous.” Center for Chemical Process Safety (CCPS). Guidelines for Engineering Design for Process Safety, 2nd ed., 2012. 31 The hierarchy of controls is a concept that refers to the ranking of the safety potential of various strategies for hazard management from most to least effective. Even if a greater risk-reduction action, such as minimizing hazardous chemicals, is used, it is still important to maintain other, lower level, administrative controls, such as wearing adequate personal protective equipment (PPE). This way even if one risk reduction system fails others are in place to prevent or minimize the incident’s impact. Prevention and mitigation strategies represent the safeguards designed to eliminate, prevent, reduce, or mitigate a scenario; they are also referred to as barriers, layers of protection, lines of defense, or control measures. CSB Investigation Report. Catastrophic Rupture of Heat Exchanger. Tesoro Anacortes Refinery. May 2014; pp 34-35. http://www.csb.gov/assets/1/7/Tesoro_Anacortes_2014-May-01.pdf (accessed June 20, 2016). 32 The CSB notes this is not the only example of the Tesoro Martinez refinery postponing efforts to correct problems with more robust equipment. Examples include the permanent pump identified in the January and August 2012 incidents summarized above in the Introduction.

18 CSB • Tesoro Martinez Case Study sampling. Additionally, due to the dangers this sampling station presented, the Tesoro Martinez refinery’s acid sampling procedure required operators to evacuate nearby workers from the area prior to initiating the sampling procedure. Rather than reengineering the process to eliminate the vapor cloud, Tesoro placed burlap bags around the process sewer drain opening to attempt to reduce the size of the vapor cloud generated by the sampling process (Figure 5).

Figure 5. The photo on the left shows a burlap bag covering the process sewer drain at one of the Tesoro Martinez refinery sulfuric acid sample stations. The photo on the right shows the white vapor cloud released from the process sewer drain when Tesoro operators conduct the procedure to sample the sulfuric acid. Although the Tesoro Martinez refinery’s acid sampling procedure warns that “acid fumes are harmful if inhaled” and that “extreme caution must be used to prevent irritation and/or injury from acid fumes,” the procedure did not recommend or require any respiratory protection to be worn (Figure 6). Tesoro operators informed the CSB that during acid sampling, their personal gas monitors routinely alarmed, indicating the presence of harmful sulfur dioxide gas.33 Furthermore, Tesoro operators informed the CSB that despite the fact that Tesoro Martinez required four items of PPE, the workers only wore the goggles and chemical gloves. The workers did not use the acid suit jacket required by the procedure because Tesoro stopped carrying this item in its PPE inventory. Operators also explained that because the face shield attachment interfered with how the goggles attached to the operators’ hard hats, they never wore the shields.

33 Tesoro records state that sulfur dioxide is a colorless, corrosive, toxic gas with an irritating pungent odor that can be perceived as "burnt matches." Cal/OSHA defines the Short Term Exposure Limit (STEL) as a 15-minute time- weighted average exposure, which is not to be exceeded at any time during a workday even if the 8-hour time- weighted average is below the PEL. See https://www.dir.ca.gov/title8/5155.html (accessed June 14, 2016). Cal/OSHA has set the STEL for sulfur dioxide as five parts of gas or vapor per million parts of air by volume at 25 °C and 760mm Hg pressure. See https://www.dir.ca.gov/title8/5155table_ac1.html (accessed June 14, 2016). Sulfur dioxide is a toxic gas that is immediately dangerous to life and health at a concentration of 100 parts per million. See http://nj.gov/health/eoh/rtkweb/documents/fs/1759.pdf (accessed June 14, 2016).

CSB • Tesoro Martinez Case Study 19

Figure 6. Excerpt of Tesoro’s sulfuric acid sampling procedure detailing the personal protective equipment (PPE) requirements. Tesoro workers informed the CSB that of the four items of PPE required by Tesoro, only goggles and chemical gloves were actually worn. After the February 12, 2014 incident, Tesoro upgraded the PPE requirements during acid sampling to include a full acid suit and air-purifying respirator (Figure 7).

Figure 7. Photos of an operator at the Tesoro Martinez refinery taking a sulfuric acid sample. These photos were taken following the February 12, 2014 incident with the new PPE requirements in place. Tesoro’s sulfuric acid sampling system requires two separate one-hour waiting periods to allow hydrocarbons to vent to the atmosphere. In addition to potential liquid acid exposure, the sampling process exposes the operator to hydrocarbon vapor, and sulfuric acid vapor. Following the incident, Tesoro upgraded the PPE requirements to include a full-face respirator and a full-body acid suit.

20 CSB • Tesoro Martinez Case Study In its 2009 process hazard analysis (PHA), Tesoro evaluated the hazards of sampling sulfuric acid. Tesoro’s PHA documentation indicates that the PHA Team identified the sampling hazard to have a potential severity of a lost workday injury, which they anticipated to be likely to occur within 20 years. Tesoro’s PHA risk matrix identifies this combination of severity and frequency to be “low risk.” The PHA team listed PPE as the only safeguard necessary to mitigate the worker injury hazard despite the fact that not all of the PPE required by the procedure was available. In addition, workers could not use some of the required PPE due to the incompatibility of the face shield, hard hat, and goggles. In its 2013 PHA, Tesoro did not specifically evaluate the hazards of the sulfuric acid sample stations. Instead, a human factors checklist was used to cover the sample systems. The checklist questions did not evaluate sampling system hazards and were limited to evaluating issues involving accessibility, such as the proximity to safety showers, eyewash stations, and transport of samples from elevated locations. Therefore, they were unlikely to trigger an effective evaluation of the sulfuric acid sampling system hazards. In addition, the report from Contra Costa County’s inspection following the February 12, 2014 incident concluded that neither the 2009 nor the 2012 alkylation unit PHAs adequately evaluated the hazards associated with the acid sample stations.34

Tesoro approved a project to install new closed loop sample systems in June 2009 (Figure 8). Tesoro designed these systems to be a significant upgrade to the existing sample stations, with the goal of minimizing operator exposure to the sulfuric acid when sampling, among other important reasons. Tesoro stated this new design was inherently safer than the existing sample system. Tesoro’s design improvement records show:

“Closed loop sampler design is inherently safe and will protect Operators against exposure to strong sulfuric acid when sampling.” “New closed loop sampler is simple to use and involves the use of only two valves each time a sample is taken. The isolation valve is spring loaded and must be held open to take a sample; thus, insures [sic] against the sampler being left open and accidentally spilling sulfuric acid or venting nitrogen to the atmosphere.”

34 Contra Costa County conducted an inspection of the alkylation unit at the Tesoro Martinez refinery following the February and March 2014 incidents. CCHMP issued a report Compliance with California Accidental Release Prevention (CalARP) & Contra Costa County Industrial Safety Ordinance (ISO) Programs: Alkylation Unit Inspection Report: Trade Secret Version on November 10, 2015. The 145-page report identified 50 regulatory concerns and developed 70 improvement suggestions to Tesoro. The 120 regulatory and improvement items identified by the Contra Costa County inspection report covered a broad range of process safety management categories, including: operating procedures; mechanical integrity; management of change; incident investigation; process safety information; process hazard analysis; human factors applications; safe work; management of organizational change; miscellaneous; and management systems. CalARP is an acronym for the California Accidental Release Program. See http://www.caloes.ca.gov/FireRescueSite/Documents/CalARP%20Regulations%2001012015.pdf (accessed June 14, 2016).

CSB • Tesoro Martinez Case Study 21 “The samplers will be located at waist level or slightly higher so that the Operators won't have to bend or stretch to take a sample.”

Figure 8. Photo showing one of the upgraded sample stations that Tesoro installed to reduce operator exposure to acid during sampling. Tesoro never resolved the reliability issues with these sample stations and the sample stations were taken out of service. As a result, they were not in use at the time of the February 12, 2014 incident. In addition to the safety improvements, the justification Tesoro stated for these upgraded sample systems included ensuring compliance with environmental regulations and a significant annual cost savings of approximately $300,000. Despite the significant cost to purchase and install the improved sample systems, Tesoro records show the new equipment would have a two-year payback time. Tesoro based the quick return on this investment on the company’s expectation that these new sample systems would allow the operations staff to further lower the spent sulfuric acid concentration. Due to reliability problems with these upgraded sample systems, however, Tesoro ceased efforts to make them functional and took them out of service.35 These problems included plugging, foaming of the collected sample, and problems with the nitrogen purge supply. According to Tesoro employee statements made to the CSB, Tesoro Martinez laid off the contract engineer responsible for identifying and correcting the sample system reliability problems.

Consequently, Tesoro relied on the old sample systems, the use of which resulted in the February 2014 sulfuric acid release incident that injured two workers. Ultimately, Tesoro continued to rely on PPE as the control method, which is a less effective method than engineering controls on the hierarchy of controls. As Tesoro did not provide appropriate PPE and compliance with PPE expectations were not reinforced, inadequate controls were in place to protect workers from the sulfuric acid hazards.

35 As of May 2016, the more robust sample systems were still not in service; however, Tesoro stated to the CSB that they are actively working with the supplier to address reliability and safety concerns.

22 CSB • Tesoro Martinez Case Study 3.3.2 Tesoro Los Angeles Refinery Sample Systems Tesoro records indicate that the Martinez refinery’s sulfuric acid alkylation unit acid sampling system has more potential for operator exposure to acid than those in use at the other Tesoro refinery in California, Tesoro’s Los Angeles refinery, which uses an enclosure around the sampling system to protect operators from potential acid spray (Figure 9).

Figure 9. Photo of the sulfuric acid sample station at the Tesoro Los Angeles refinery. This sample system includes an enclosure at the sample point to protect operators from potential acid spray.

CSB • Tesoro Martinez Case Study 23 3.3.3 Company X Refinery Sample Systems Company X refinery’s sulfuric acid alkylation unit acid sampling equipment (Figure 10) is similar to the inherently safer system that Tesoro installed but took out of service. Company X initiated efforts to upgrade its alkylation unit sample stations in 2012. The design justification for the upgrade includes improved design that would be safer because it would minimize the potential for worker exposure to sulfuric acid. Company X also uses a more robust piping material due to the “extremely high” corrosivity of the sulfuric acid. Company X installed these sample systems in 2013 and the CSB learned that although these systems had some initial reliability problems similar to those Tesoro Martinez experienced, Company X successfully transitioned to its more robust sample systems.

Figure 10. Photo of the sulfuric acid sample station at the Company X refinery. The photo on the left shows a typical sample station used by Company X workers to obtain sulfuric acid samples. The photo on the top right shows a typical sample bottle and the photo on the bottom right shows the sample bottle installed to obtain a sample.

24 CSB • Tesoro Martinez Case Study 3.3.4 Company Y Refinery Sample Systems Acid sampling equipment within the sulfuric acid alkylation unit at the Company Y refinery is also more robust than the system at Tesoro Martinez involved in the February 12, 2014 incident.36 Company Y’s acid sampling equipment consists primarily of piping with only a short section of tubing used to collect the acid sample (Figure 11). The sampling equipment (piping, valves, and tubing) used by Company Y is better designed and maintained than the equipment at the Tesoro Martinez refinery (left photo in Figure 3).

Figure 11. Photo of the sulfuric acid sample station at the Company Y refinery. The photo shows a typical sulfuric acid sampling station at the refinery. The yellow circle identifies the location where the operator obtains the acid sample.

36 Required sampling PPE at the Company Y refinery includes goggles, face shield, rubber gloves, and a rubber apron.

CSB • Tesoro Martinez Case Study 25 3.4 Organizational Analysis The Tesoro Martinez refinery’s practices of taking more robust equipment out of service, tolerating unnecessary worker exposure during sampling, and failing to ensure effective PPE all point to weaknesses in the refinery’s alkylation unit safety culture.

  1. 4.1 Equipment Testing and Postponing Upgrades

Tesoro requires workers to leak-test instrument tubing after installation and prior to initial operation, but there is no requirement to leak-test process tubing, such as the sample system tubing, after making modifications or repairs. In addition, piping and larger equipment would be leak-tested before putting them into service after maintenance repair work, but tubing such as that used for the acid sampling systems was not leak-tested. Workers at the site recognized the discrepancy but were not sure why Tesoro differentiated tubing this way. When asked why process tubing was not leak-tested prior to putting equipment back in service following nonroutine maintenance, such as repairs conducted the day before the February 2014 incident, one worker stated, “I’m not sure why. We just don’t.”

As previously described, Tesoro installed, but later ceased efforts to implement a more robust sulfuric acid sampling system. Taking the sample systems out of service that Tesoro had installed to protect workers and continuing to rely on the old sample systems that posed unnecessary risks to operators in terms of acid exposure further demonstrates a weak commitment to safety.

This type of decision-making also continued a trend of postponing completion of important equipment upgrades at the Tesoro Martinez refinery that led to subsequent worker injuries from sulfuric acid releases. For example, two additional acid release incidents that occurred in January and August 2012 (listed as incidents 4 and 8 in the Introduction) both occurred as the result of ceasing efforts to repair permanent equipment. Instead, Tesoro installed temporary equipment that was not compatible with sulfuric acid. In January 2012, a temporary pump failed and injured one worker. But Tesoro’s investigation of the January 2012 incident did not trigger a thorough hazard review of the temporary equipment and a temporary hose that was not compatible with sulfuric acid remained in service, but then subsequently failed in August 2012, injuring two more workers. 3.4.2 PPE Unavailability and Insufficiency As noted above, Tesoro Martinez operators informed the CSB that Tesoro failed to make important PPE, the acid suit jacket, required by refinery sulfuric acid sampling procedures available for operators to use. When confronting a particular safety issue, a company with a robust safety culture would use a hazard analysis to identify appropriate controls to minimize and mitigate the effects of those hazards. A culture that fosters safety should ensure that controls such as procedures reflect actual practices and address problems with PPE so that workers have the equipment they need, and that all PPE is functional. The required PPE was either not available, or did not fit correctly, and therefore Tesoro workers did not wear it. Tesoro alkylation unit operators stated that of the four items of PPE required by Tesoro, they only wore the goggles and chemical gloves. The workers stated that they did not use the acid suit jacket

26 CSB • Tesoro Martinez Case Study required by the sampling procedure because Tesoro stopped carrying this item in its PPE inventory several years before the February 2014 incident. In addition, operators did not wear the required face shield because it interfered with how the goggles attached to the operators’ hard hats. As a result, operators stated that they never wore the face shields. Some worker comments from a 2013 Tesoro Martinez refinery safety culture survey (discussed in more detail in Section 5.1) also reflect PPE availability problems at the refinery. Workers provided the following verbatim comments in the 2013 safety culture survey: “Selection & availability & maintenance of necessary PPE has slipped to unacceptable conditions. This needs to be addressed & fixed.” “PPE is out of stock or tough to get at the unit most times.” “We no longer keep an adequate amount of PPE on hand.” 3.4.3 Production vs. Safety In Tesoro’s 2013 safety culture assessment, some worker comments identified other weaknesses as well – weak safety values and a weak commitment to process safety. Tesoro Martinez alkylation unit workers informed the CSB that they believed the culture at the refinery favored production over safety, and management and workers alike were often hesitant to initiate a shutdown. A Tesoro operator told the CSB that during the February 12, 2014 incident, he had to use his stop work authority to promptly shut down the unit and disregard perceived management pressure to keep the unit operating during the 84,000- pound sulfuric acid release.37 The operator knew that if the acid drained out, the flammable hydrocarbon layer on top of the acid would follow, likely resulting in an escalation of the incident with the potential for an explosion and fire. Some alkylation unit workers informed the CSB, however, that not all workers would exercise their stop work authority due to a history of perceived retaliation at the facility for exercising stop work authority. 3.4.4 Caustic Sampling Issues Tesoro Martinez alkylation unit operators informed the CSB that the sodium hydroxide solution (“caustic”) sampling systems were even more hazardous than the sulfuric acid sampling systems. One employee explained that industrial hygienists and other safety staff accompanied him on a tour in order to observe employees taking a sample of caustic, which they witnessed periodically splattering from pockets of butane. This required the relocation of staff from the adjacent areas and temporary work stoppage until sampling ended. Another alkylation unit operator corroborated this, explaining the various Tesoro personnel who he brought to the area to show “how the caustic blows back” when operators take caustic samples. He stated that the “battle” over caustic spray incidents had been going on for “years and years” without the refinery resolving the issue. The employee explained:

37 Tesoro records indicate unit shutdown was initiated 16 minutes after the sulfuric acid release began.

CSB • Tesoro Martinez Case Study 27 “You crack it open a little bit and it just spits out. And you have to hide yourself behind piping to shield yourself from anything. It's like one of the only defenses that you have.” In addition, Contra Costa County’s report, detailing the results from its inspection conducted after the February 12, 2014 acid release incident, stated that Tesoro’s 2012 PHA identified the hazards caustic sampling presented to workers, but did not ensure the hazard would be corrected. The PHA stated, “[p]otential personnel exposure concerns to caustic and butane during sampling due to sample point not being a closed system. Operations experience suggests that foaming and HC [hydrocarbon] flashing causes caustic to spray out of the sample point increasing personnel exposure risk.” The county’s report also noted that no PHA recommendations were made as the “[t]eam noted that plans exist to upgrade the sampling systems.” Upgrades to the caustic sampling systems did not occur, however, until after the February 12, 2014 sulfuric acid release incident that injured two workers. An alkylation unit employee also reported that personal gas monitors for sulfur dioxide “always go off” (alarm) during caustic sampling. Alkylation unit operators reported numerous incidents involving workers being sprayed during caustic sampling, but also stated that there is underreporting of the incidents despite the widespread number of occurrences. CSB investigators learned from alkylation unit workers that these caustic spray incidents result in workers using the safety showers, but the workers “don’t want to report it” as a caustic spray incident, so they will say that they are “washing their hands” instead of washing the caustic off of their faces. “You know you're not washing your hands. You don't wash your hands out there. Okay. But if they're getting it off their face, and they don't want to report it, you know, just like I said, in fear of Tesoro.” Finally, following the February 12, 2014 incident, workers informed Cal/OSHA safety engineers about their safety concerns with the alkylation unit caustic sampling systems. Cal/OSHA referenced these sample systems in its order to prohibit use. With respect to the caustic sampling systems, the Cal/OSHA order stated: Operators state they are afraid to take caustic samples. The lines [piping] they use to get the Caustic samples always plug up on them and they have to hit the pipes with something to free the plug. They use a 1½- inch pipe with a cup on the end of it to grab the sample so they are very close to the caustic when they try to clear the line from the plugging. They also get bubbles of butane in the stream of caustic which causes the caustic to splatter out at them. Following Cal/OSHA’s enforcement efforts, Tesoro modified all of the caustic sampling stations to minimize worker exposure to caustic prior to resuming production at the alkylation unit. Furthermore, since Tesoro Martinez had no procedure to take caustic samples, Tesoro developed one and trained workers on it, in order to improve safety when sampling caustic. Tesoro Martinez also increased the PPE requirements during caustic sampling to include an acid suit and an air-purifying respirator.

28 CSB • Tesoro Martinez Case Study 4.0 March 10, 2014 Incident 4.1 Incident Description On March 10, 2014, sulfuric acid sprayed two contract workers while they conducted planned nonroutine maintenance work to remove approximately 40 feet of 1-inch piping in the same alkylation unit. The sulfuric acid sprayed the two workers when they cut into the piping using a portable band saw (Figure 12, Figure 13, and Figure 14). The piping was not adequately drained of process chemicals and remained under pressure despite Tesoro issuing a hot work permit to cut and remove a portion of the piping. This piping normally carries butane38 liquid to the mechanical seal39 of the alkylation reactor agitator (mixer), but at times has had sulfuric acid in it when the alkylation reactor pressure exceeds the butane supply pressure.

Although the maintenance workers were wearing protective suits while performing the work as a precaution for potential residual sulfuric acid, the acid still burned them. The hood of one worker’s acid suit caught on scaffolding as he evacuated from the temporary work platform, exposing his head and neck to the spraying acid. Acid drained onto the second worker’s neck and burned him while removing his PPE during decontamination in the safety shower. An ambulance transported both workers to a local hospital for evaluation and treatment of their first and second-degree chemical burn injuries. The Cal/OSHA PSM Unit investigated the incident and issued citations totaling $13,500 to the contractor and $45,970 to Tesoro.40

38 Although this utility system was commonly referred to as butane, Tesoro engineering documents indicate it is a hydrocarbon mixture that operates at approximately 150 pounds per square inch gauge (psig) and 20 °F and consists of approximately 79 weight percent (%) isobutane, 16% butane, and 5% other hydrocarbons. 39 Mechanical seals are used to keep the contents of rotating equipment such as pumps and compressors from escaping. They do this by sealing the shaft that protrudes from the casing. 40 Citations issued to the contractor included issues surrounding the proper use of PPE. Citations issued to Tesoro included missing pressure gauge in field that was shown on piping and instrument diagram, safe lockout and tagout, failure to confirm depressuring of line, and lack of safety procedures. The citations to Tesoro were later reduced to one general and one serious citation.

CSB • Tesoro Martinez Case Study 29

Figure 12. CSB depiction of the workers cutting the 1-inch butane piping just prior to the sulfuric acid spray incident on March 10, 2014.

30 CSB • Tesoro Martinez Case Study

Figure 13. Photo of piping involved with the March 10, 2014 incident. The yellow oval shows the cut the workers made using a band saw that resulted in the acid release. Figure 14 also shows the location of this piping.

Figure 14. Photo of location of the March 10, 2014 incident. As depicted in Figure 12, two workers were located on this temporary scaffold platform and were cutting the piping (yellow circle) with a portable band saw.

CSB • Tesoro Martinez Case Study 31 4.2 Technical Analysis The Tesoro Martinez refinery’s alkylation unit contains several reactors. To perform maintenance, Tesoro periodically shuts down each reactor while the other reactors continue to operate. As a result, refinery management regularly relies upon a single valve to isolate the butane piping. This design is the least effective approach to ensure the isolation of hazardous material and did not follow Tesoro corporate and industry standards. As a result, Tesoro’s isolation system design contributed to the March 10, 2014 incident.

At the time of the March 10, 2014 incident, other alkylation reactor agitator systems were operating with liquid butane flowing from a process pump to agitators for these reactor systems. Contrary to corporate requirements, the refinery used a single isolation valve to prevent liquid butane from flowing into the piping system workers were preparing to cut. Tesoro isolated the butane piping involved in the March 2014 incident with a single valve and placed it out of service in December 2013. It is likely that a slow leak through the single isolation valve gradually increased the pressure in the butane piping up to 150 psig between December 2013 and March 2014. Pressure from this butane caused the sulfuric acid to spray out of the piping when workers cut into it. The CSB learned from alkylation unit workers that Tesoro commonly used single valve isolation rather than blinding and flushing the piping before conducting hot work that involved what met the refinery’s definition of “low energy” tools.41

Figure 15 below defines Tesoro Martinez terminology used in its policies pertaining to controlling hazardous energy for maintenance operations. Fully draining, eliminating internal pressure, and removing hazardous material through flushing or other means should have enabled the workers to verify the piping was safe to allow for the cutting and pipe removal – especially if the cutting occurred in a timely manner, immediately following the flushing. The pipe cutting on March 10, 2014, however, had a three-month delay from when the piping was drained until the cutting was performed.

41 The permit stated that this work involved “low energy” tools. The permit defines “low energy tools” to include electric tools, battery powered tools, jackhammers, abrasive blasting, vacuum truck operation, motorized equipment, and refueling. The permit defines “high energy tools” to include welding, cutting, pre/post weld heat- treating, other open flame, abrasive blasting on the roof of a cone roof tank, grinding, powder-actuated tools, and welding on in-service/unclean piping and/or equipment.

32 CSB • Tesoro Martinez Case Study

Figure 15. Tesoro definitions relevant to controlling hazardous energy prior to performing a maintenance operation such as cutting the butane piping for removal. A Tesoro corporate standard is the source for the hot work definition. All other definitions are from Tesoro Martinez refinery procedures. A Tesoro alkylation unit operator stated to the CSB that on the day of the incident he understood (correctly) that the “line had already been opened once before.” In addition, the system was blinded on one end and locked closed on the other, giving him no reason to believe the pipe was not already empty and safe for workers to cut and remove. Regardless, prior to issuing the hot work permit for the job, the operator opened a drain valve associated with the piping system and he observed what appeared to be a “wisp” of butane vapor come out of the valve. The operator then used his gas meter to perform an atmospheric check for additional hydrocarbon flow from the drain valve, and found none. The operator explained: “So to me that meant that the line, in my mind, was cleared because I didn’t have a pressure gauge on that line to determine if there was in fact any pressure on there.” The contract workers who were present to cut and remove the piping also both knew the pipe was worked on before, had already been disconnected from the alkylation reactor with a blind flange installed, and saw that the drain valve was opened with no hydrocarbons detected on the operator’s gas meter. These factors reinforced to them the appearance of a safe condition for performing the work. After the incident, however, it was determined that the drain piping was internally plugged, preventing flow through the open drain valves, and as a result it provided the operator and contract workers with a false sense of security that the piping had been depressurized and drained of its contents (Figure 16).

CSB • Tesoro Martinez Case Study 33

Figure 16. Photo of drain piping and valves. Evaluation of this equipment after the incident identified plugging in these piping components that prevented liquid from freely draining through the open valves. 4.3 Organizational Analysis 4.3.1 Pressure to Expedite Maintenance Work To understand the March 10, 2014 incident it is also necessary to consider the broader cultural aspects of conducting maintenance and operations activities at the Tesoro Martinez refinery. Tesoro alkylation unit operators consistently described a difficult work environment where management criticized and even investigated workers for purportedly holding up maintenance work, and workers perceived intense pressure to avoid delaying maintenance work. Tesoro supervisors conducted routine investigations to determine why jobs took longer for the operators to prepare than the supervisors initially believed they should have taken. This caused alkylation unit workers to feel pressure to expedite work and take no additional precautions beyond the normal steps required to ensure work was safely prepared for maintenance. When asked why operators might not take the time to perform extra steps that could be prudent in order to ensure a system was effectively drained (such as, in this case, rodding out a valve or pressuring with nitrogen to verify that the system is ready and safe for maintenance), one operator stated that such actions would be “frowned upon by management.” He also noted that he would be “questioned

34 CSB • Tesoro Martinez Case Study by management” as to why he was taking those potentially unnecessary additional precautions. Thus, the organizational goals and practices, directed and supported by management, created a culture at the alkylation unit that tended to discourage the performance of extra work unless there was a clear indication of a dangerous condition.

As a result, the operator and contractors did not take any extra steps to ascertain whether the piping was properly drained and depressurized. All available evidence suggested that the pipe was properly drained and depressurized. Combined with the fact that the pressure indicator on this piping system was not available to alert the workers to hazardous conditions (because the pressure indicator had been previously removed and replaced with a plug as shown in Figure 17), the operator had no indication of the dangerous condition – that a pressurized inventory of concentrated (94 weight percent) sulfuric acid remained in the piping.42

Figure 17. Photo of piping involved with the March 10, 2014 incident (left photo). The photo on the right shows the piping after repairs were made and the pressure indicator was reinstalled. Note the yellow circle in the photo on the left that shows the location where a pressure indicator was supposed to be located, but had been removed. Had this pressure indicator been available it could have alerted workers that dangerous pressure remained in the piping system.

42 The CSB was unable to determine why the pressure indicator had been removed and replaced with a plug.

CSB • Tesoro Martinez Case Study 35 4.3.2 Blinding and Isolation Requirements Safety culture is a key factor in major accident prevention and, as the CSB noted in the Macondo investigation report, “is expressed not only in the stated goals, policies, procedures, and practices that a company formally adopts to enhance process safety, but also in the actual commitment by leaders, management, and the workforce to meet those corporate requirements. This commitment impacts ‘how the organization behaves when no one is watching’ and influences decisions by personnel at all levels of the organization.”43 As will be discussed below, Tesoro showed a lack of commitment to ensuring that refinery-specific policies and work practices met good process safety practices, standards, and corporate requirements. 4.3.2.1 Blinding Requirements In December 2013, workers disconnected the butane piping involved in the incident from the alkylation reactor, and then installed a blind flange on the reactor side in accordance with Tesoro standards and good industry practice, as shown in Figure 18. On the butane supply side, however, Tesoro relied on a single isolation valve, rather than disconnecting and/or blinding, contrary to corporate standards. The CSB learned that this was a common practice at the Tesoro Martinez refinery’s alkylation unit during hot work that involved “low energy” tools that met the site’s concept of “low risk.” The Tesoro Martinez policy defines “high risk” work as jobs that involve working on high-pressure systems, high hydrogen sulfide, sulfur dioxide, ammonia, and process streams above the auto ignition temperature. The policy provided no actual definition of “low risk.” The workers commonly understood that “low risk” applied to anything not defined as “high risk.” The workers considered the task performed on March 10, 2014, to be “low risk” work with a “low energy” cutting tool.

Figure 18. Photo of piping isolation at time of March 10, 2014 incident. The photo on the left shows the piping isolation on the reactor side. A blind flange (red arrow) was installed in December 2013 when the piping was disconnected from the alkylation reactor. The photo on the right (yellow arrow) shows the single valve used to isolate butane from the piping workers were cutting.

43 See page 235 of the CSB Macondo investigation report, Volume 3, available at http://www.csb.gov/assets/1/19/Macondo_Vol3_Final_20160527.pdf (accessed June 13, 2016).

36 CSB • Tesoro Martinez Case Study Tesoro’s corporate standards, however, were more protective than the site policy and required the Tesoro Martinez refinery to isolate the butane line using a blind rather than a single isolation valve. Blinding is a more robust isolation approach that should have prevented butane from pressuring up the line. According to Tesoro’s corporate engineering standard for metallic piping systems, isolation using a single valve is not permitted. The corporate standard requires a more robust isolation approach, such as blinding or a double block and bleed, in situations where “positive isolation is required.” In addition, another Tesoro corporate standard that governs blinding and isolation only allows single valve isolation for piping that contains low-risk material, such as air or water.

The United Kingdom safety regulator, the Health and Safety Executive (HSE), uses the hierarchy of controls to explain the mechanical security provided by various types of isolation methods.44 According to HSE, when using valves, the isolation reliability of a double block and bleed is greatest while that for a single valve is least.45 Furthermore, HSE states that companies should not use a single valve for isolation when working on a live plant containing hazardous substances.46

In addition, the American Petroleum Institute (API) industry standard that addresses safe hot work practices provides the following guidance: An important precaution before welding or cutting piping is to properly isolate the piping (e.g., blinding, disconnecting, or double blocking and bleeding). The type of isolation used will depend on the contents, pressure, or piping configuration. A single valve may be used, depending on conditions and if isolation is not required (e.g., welding on inert gas piping, water lines). However, if the work falls under certain regulatory standards (such as OSHA confined space or Lockout/Tagout standards) a single closed valve is not likely to be an acceptable means of isolation. (Emphasis added) 47 Despite the corporate and industry requirements and strong guidance, the Tesoro Martinez site policy allows the refinery to use single valve isolation for short duration “high risk” work that, as noted above, excludes some types of hot work on piping and equipment containing hazardous material. Further, although the Martinez policy acknowledges, “blinding is the best method of isolating piping system and equipment for cold work” (work performed via a hot work permit with low energy tools), the Tesoro Martinez policy nevertheless permitted the work to be performed using a single isolation valve – a much less effective approach. The Tesoro Martinez refinery policy states:

44 Health and Safety Executive (HSE). The Safe Isolation of Plant and Equipment, HSG253, pg. 25, 2006. http://www.hse.gov.uk/pubns/priced/hsg253.pdf (June 14, 2016). 45 HSE defines a double block and bleed as isolation method consisting of an arrangement of two block valves with a bleed valve located in between. Ibid at p 79. 46 HSE also defines a bleed valve as a valve that is used for draining liquids or venting gas from a pressurized system. Ibid at p 27. 47 API Recommended Practice (RP) 2009. Safe Welding, Cutting, and Hot Work Practices in the Petroleum and Petrochemical Industries. 7th Ed., Section 14.2, February 2002.

CSB • Tesoro Martinez Case Study 37 Blinding is the best method of isolating piping system and equipment for cold work. However, in many instances the low risk involved in doing a task does not justify installing blinds. In such cases a double block and bleed shall be used if it is available. If a double block and bleed is not available then single block valves may be used. Rather than limiting single valve isolation to low-risk situations involving air or water consistent with the corporate standard, the Martinez refinery policy greatly expanded upon the situations allowing single isolation valves. Consequently, this exposed workers to higher risks than allowed by the corporate and industry standards. 4.3.2.2 Requirements for Removing Pressure, Flushing, and Draining Although routinely not performed, the Tesoro Martinez refinery policy on blinding and isolation requirements does require flushing the piping prior to performing hot work on systems, such as the butane piping being cut on March 10, 2014. Extreme caution must be taken to insure that all hydrocarbons have been eliminated (i.e., steaming, purging, or water filling the equipment). The refinery management’s allowance of the improper use of a single isolation valve, however, prevented the workers from flushing the piping prior to performing hot work. As seen in Figure 19 below, Tesoro’s corporate blinding policy provides for a piping design that includes an additional valve that would allow flushing with water, whereas the single isolation valve does not. When workers went to the job site to cut and remove the butane piping, they did not know the drain piping was internally plugged, preventing the residual sulfuric acid inside the pipe from draining through the open valves. Had workers flushed the piping, it is likely that they would have identified the plugged drain valve when they attempted to drain the water. In addition, the workers believed the pipe had been drained and depressurized. Visually observing that the valves were open, seeing no flow from the open drain piping, and having no hydrocarbons detected on the operator’s gas meter during an atmospheric check, provided a false sense of security that the piping was safe to cut. In addition to flushing the butane piping system, both the Tesoro Martinez refinery policy and the Tesoro corporate standard required the system to be drained and internal pressure removed before cutting and removing the line: “Prior to opening lines or equipment: Gases, oils or chemicals must be drained, washed, and steamed or purged as applicable.” “When using vents or bleeders, pressure shall be relieved by opening high-point vents or bleeders and ensuring that vents and bleeders are not plugged. This can be accomplished by using the appropriate tools for clearing out lines and/or installing a pressure gauge.”

38 CSB • Tesoro Martinez Case Study “Pressure shall be reduced to atmospheric or as near atmospheric as is practical.” Due to the fact that the refinery policy allowed single isolation valves, and workers were unable to identify the plugged drain valve, the piping was not safe to cut at the time of the incident. 4.3.2.3 Isolation Improved after the Incident Two days after the March 2014 incident, Tesoro modified the isolation for the liquid butane piping from using single valve isolation to blinding, a more robust isolation approach that followed the best practice methods detailed in refinery procedures, corporate standards, and industry standards (Figure 19). Had Tesoro followed its own standards and recommended practices during the initial December 2013 isolation of this butane piping system, the March 10, 2014 incident could have been prevented. Piping should have been flushed to remove the acid, drained to ensure no residual liquid, and blinded to eliminate the potential for a slow leaking valve to pressure the piping system.

Figure 19. Photo of post-incident isolation of liquid butane supply piping to alkylation reactor. This photo shows the same piping shown in the right photo of Figure 18. Two days after the March incident, Tesoro modified the liquid butane isolation to match the API recommend practice, Tesoro’s corporate standards requirement, and Tesoro Martinez procedure recommendations by disconnecting and installing isolation flanges on each end of the isolated piping.

CSB • Tesoro Martinez Case Study 39 4.3.3 Lessons from Previous Incidents Not Learned 4.3.3.1 1999 Tosco Incident On February 23, 1999, a fire at the Tosco Avon refinery (now the Tesoro Martinez refinery) fatally injured four workers during a nonroutine maintenance activity to replace piping that had not been effectively isolated and drained. While working to remove the piping, flammable hydrocarbon liquid released and ignited. As the CSB most recently discussed in the Tesoro Anacortes investigation report,48 nonroutine work can be a highly hazardous activity, as seen in this case, because work was performed on equipment that contained hazardous process materials due to reliance on a single isolation valve. The Center for Chemical Process Safety (CCPS) has noted, “by its nature, nonroutine work carries with it the potential for unrecognized hazards that sometimes has led to a catastrophic incident.”49 The CSB investigated the 1999 Tosco incident and issued a final investigation report in March 2001.50 The CSB investigation found that on the day of the incident a Tosco work permit authorized maintenance workers to remove 100 feet of 6-inch piping that was not drained because drain lines were plugged and remained pressurized from the running process. When workers opened liquid-filled piping, flammable naphtha released onto a hot distillation column and ignited, quickly engulfing the equipment and the workers. As detailed in the CSB Tosco investigation report, although Tosco procedures required piping to be drained, depressurized, and flushed prior to opening, this was not accomplished.51 The CSB report noted the refinery had a historic practice of opening piping and equipment prior to draining and verifying removal of hazardous material.52 In addition, the CSB found that Tosco’s job planning procedures did not require a formal evaluation of the hazards associated with replacing the piping because Tosco classified it as low-risk maintenance and managers did not reevaluate the risks when workers alerted them about the fact that the line could not be drained and isolated. Thus, Tosco directed workers to conduct nonroutine maintenance to remove piping without proper assessment and control of hazards. Furthermore, the CSB found that Tosco supervisors were not involved in inspecting the job site or reviewing the work permit. The CSB investigation also noted the maintenance supervisor was the only management representative present during the nonroutine piping removal work. The CSB made a recommendation53 that addressed

48 CSB Investigation Report. Catastrophic Rupture of Heat Exchanger. Tesoro Anacortes Refinery. See http://www.csb.gov/assets/1/7/Tesoro_Anacortes_2014-May-01.pdf (accessed June 14, 2016). 49 Center for Chemical Process Safety (CCPS). Guidelines for Auditing Process Safety Management Systems. 2011; p 393. 50 CSB Investigation Report. Refinery Fire Incident. Tosco Avon Refinery. http://www.csb.gov/assets/1/19/Tosco_Final_Report.pdf (accessed June 14, 2016). 51 Ibid. 52 Ibid at p 47. 53 The CSB issued recommendation 1999-014-I-CA-2 to the Ultramar Diamond Shamrock Golden Eagle refinery (now Tesoro Martinez refinery) and the Board voted to designate it as “Closed – Acceptable Action” on July 5, 2005.

40 CSB • Tesoro Martinez Case Study the importance of advanced planning and thorough hazard evaluations for the safe performance of hazardous nonroutine work. The refinery developed and tracked corrective action items to address the CSB recommendation. Although these action items were closed in early 2002 when Valero still owned the refinery, Tesoro should have retained knowledge of these lessons. Managers who remained at the refinery under Tesoro ownership closed these action items. In addition, Tesoro’s corrective action tracking system still maintains the refinery’s documentation. Despite the major multi-fatality accident at this facility in 1999, the CSB notes that Tesoro has not effectively learned the major process safety lessons to prevent future similar incidents at this refinery. Although the incidents are not identical, the CSB identified that several significant process safety management system weaknesses that led to the 1999 incident were also present in the March 10, 2014 incident, as listed below:  Nonroutine maintenance was performed without the proper control of hazards;  Piping was not effectively drained and isolation was not verified prior to performing nonroutine maintenance;  The work was classified as low-risk, which resulted in less robust piping isolation practices such as relying on a single valve for isolation;  Hot work permits authorized workers to remove piping that had not been effectively isolated and drained; and  Supervisors were not involved in inspecting the job site or reviewing the work permit and the contract maintenance supervisor was the only management representative present during the inspection and review processes, as well as for the nonroutine piping removal work. In addition, Tesoro’s failure to learn the lessons of the 1999 incident at the refinery, under Tosco ownership, contributed to a weak safety culture that tolerated inadequate refinery policies, procedures, and work practices that led to the March 10, 2014 alkylation unit incident. 4.3.3.2 June 2010 Incident In June 2010, a Tesoro Martinez contract worker received a chemical burn from a sulfuric acid release during nonroutine maintenance to remove a piping component connected to an alkylation reactor. Tesoro's investigation identified the cause of this incident to be insufficient PPE due to a belief that acid was not present in the piping. Despite the fact that this piping was intended to contain butane and not sulfuric acid, the acid found its way into the line and inadequate approaches were taken to clear the line of its hazardous contents. Similar to the March 10, 2014 incident this piping provided butane to the mechanical seal for one of the alkylation reactor agitators.

CSB • Tesoro Martinez Case Study 41 In relation to the June 2010 incident, a Tesoro investigation team proposed corrective actions, including the installation of check valves to prevent a reverse flow of sulfuric acid from the reactor into this butane piping, as well as a post-shutdown wash to ensure acid did not remain in the butane piping. Two months later a management review eliminated these action items from the corrective action plan because Tesoro management determined they were not causally related to the incident. The CSB notes that if Tesoro had implemented the investigation team’s 2010 recommendations to provide reliable reverse flow protection and to perform a post-shutdown wash, the March 10, 2014 acid release incident could have been prevented. These proposed safeguards could have ensured that sulfuric acid would not be present in the butane piping.

42 CSB • Tesoro Martinez Case Study 5.0 Tesoro Martinez Refinery Safety Culture Analysis 5.1 Martinez Refinery Safety Culture Assessments 5.1.1 Introduction The Martinez refinery has a 15-year history of safety culture evaluations beginning with a 1999 assessment following the multi-fatality accident that occurred when Tosco owned and operated the facility. A follow-up evaluation in 2001 showed significant improvement in the safety culture at the refinery. In 2007 Tesoro conducted a corporate-wide safety culture survey based on the approach used by the Baker Panel, an independent panel that was formed as a result of a CSB recommendation made during the agency’s investigation of the 2005 BP Texas City refinery catastrophic accident.54 Beginning in 2009, local process safety regulations required covered refineries including Martinez to perform safety culture assessments every five years.55 The CSB investigation of the 2014 alkylation unit sulfuric acid releases and Tesoro’s own 2013 safety culture assessment identified some similar safety culture weaknesses. In addition, following the March 2014 acid release incident that injured workers, the United Steelworkers Tesoro Council, which represents Tesoro workers throughout the US, issued a statement calling for safety culture improvements at all Tesoro facilities.56 Despite performing these periodic safety culture assessments, significant safety culture weaknesses at the Tesoro Martinez refinery persist and these issues must be improved in order to prevent process safety incidents, such as the February and March 2014 sulfuric acid releases that injured four workers.

54 See http://www.csb.gov/assets/1/19/Baker_panel_report1.pdf (accessed June 14, 2016). 55 Chapter 450-8 of the Industrial Safety Ordinance (ISO), as amended by Ordinance 2006-22. The amendment modified some sections and also included a new subdivision (h) that required the completion of a Safety Culture Assessment within one year after development of guidance (which was completed on November 10, 2009), and at least once every five years thereafter. See http://cchealth.org/hazmat/pdf/iso/introduction.pdf (accessed June 14, 2016). 56 The council stated, “In light of the recent incidents at refineries owned by Tesoro, we the Tesoro Council, which represents workers at Tesoro facilities all across the United States, including refineries and pipelines, condemn Tesoro for its inadequate safety culture and call on Tesoro to improve safety at its facilities before even more catastrophic incidents occur which threaten workers, the community and property.” See http://www.usw.org/news/pdfs/Statement-Tesoro-Council-on-Safety-3.15.14.pdf (accessed June 14, 2016).

CSB • Tesoro Martinez Case Study 43 5.1.2 Industrial Safety Ordinance Safety Culture Requirements Contra Costa Health Services’ Hazardous Materials Programs (CCHMP)57 administers the Industrial Safety Ordinance (“ISO”), which covers seven facilities within Contra Costa County (“CCC”) – including the Tesoro Martinez refinery.58 The ISO requires, among other things, that covered facilities perform a safety culture assessment at least once every five years, and permits the CCHMP to audit the assessment and perform its own investigation following a major chemical accident or release59 or the occurrence of any incident that could reasonably have led to a major chemical accident or release.60 Following each assessment, the facility’s management, along with its workforce, must develop a plan to act on the audit findings that includes, among other things, the reasoning behind rejecting any findings and prioritizing the action items.61 CCHMP provides additional guidance on the conduct of safety culture assessments in ISO Guidance Document F: Safety Culture Assessments. The guidance defines “safety culture” as: [A] measure of the importance that individuals and organizations exhibit towards working safely. It is the summation of attitudes and actions people do at 2 a.m. on a Sunday night when no one is watching. An organization can influence employees to embrace positive shared safety values with consistent policies and practices and by leading through example.62

57 Contra Costa County’s Hazardous Materials program is responsible for responding to emergencies and monitoring hazardous materials in Contra Costa County (CCC). It is program’s mission to safeguard the Contra Costa County ecosystem from the release of hazardous materials and other pollutants. For more information see http://cchealth.org/hazmat/ (accessed June 14, 2016). 58 The ISO became effective January 15, 1999, and applies to petroleum refineries or chemical plants within Contra Costa County. The ISO was adopted to improve industrial safety by requiring more comprehensive coverage of the whole facility and providing more robust review, inspection, auditing, and safety requirements; requiring the development and implementation of a human factors program; and preventing and reducing the number, frequency, and severity of accidental releases in Contra Costa County. 59 The ISO defines “Major chemical accident or release” as “an incident that meets the definition of a level 3 or level 2 incident in the community warning system incident level classification system defined in the hazardous materials incident notification policy, as determined by the department; or results in the release of a regulated substance and meets one or more of the following criteria: (1) Results in one or more fatalities; (2) Results in at least twenty-four hours of hospital treatment of each of at least three persons; (3) Causes on- and/or off-site property damage (including clean-up and restoration activities) initially estimated at five hundred thousand dollars or more. Onsite estimates shall be performed by the stationary source. Off-site estimates shall be performed by appropriate agencies and compiled by the department; (4) Results in a vapor cloud of flammables and/or combustibles that is more than five thousand pounds.” County Ordinance Chapter 450-8.014(h). May 6, 2014. 60 County Ordinance Chapter 450-8.016(h). Safety Culture Assessment. May 6, 2014. See http://cchealth.org/hazmat/pdf/iso/Chapter-450-8-RISK-MANAGEMENT.pdf (accessed June 14, 2016). 61 ISO Guidance Document F: Safety Culture Assessments. June 15, 2011; p F-19. See http://cchealth.org/hazmat/pdf/iso/section_f.pdf (accessed June 14, 2016). 62 Ibid at p F-1.

44 CSB • Tesoro Martinez Case Study The guidance also elaborates on the importance of conducting safety culture assessments:

A Safety Culture Assessment will enable a facility to understand where they are in terms of risk acceptance. Additional benefits of performing a Safety Culture Assessment include:  Identify positive as well as negative aspects of the onsite health and safety program  Assist in identifying opportunities for improving health and safety  Another tool to improve facility personnel’s awareness and participation in health and safety  Identify perception gaps between managers, supervisors, and the workforce  Assist to demonstrate management’s commitment to safety by performing the assessment and visibly addressing the results63 The ISO also provides guidance for evaluating management commitment and leadership, which includes determining how effectively management “sets expectations to shutdown unsafe equipment or activities” and evaluating how effectively management responds to safety concerns.64 As discussed above, Tesoro alkylation unit workers told the CSB that Tesoro Martinez refinery management personnel pressured workers to delay the unit shutdown and were perceived to be unresponsive to workers’ safety concerns regarding the sampling systems.

  1. 1.3 History of Safety Culture Assessments

Following the 1999 Tosco incident CCHMP contracted a third party auditor, Arthur D. Little, to conduct a safety evaluation at the Avon (now Tesoro Martinez) refinery in March 1999, as well as a follow-up evaluation in April 2001. The initial assessment evaluated the refinery’s safety management systems, potential human factors issues, and safety culture, along with identifying potential deficiencies, and developing findings and recommendations.65 The evaluation found that refinery safety performance focused primarily on the number of injuries;66 that Tosco management lacked a commitment to safety;67 and workers perceived that organizational changes over the last decade were made for economic reasons and had a detrimental effect on the refinery’s safety culture.68 The assessment also found that lessons learned and safety performance issues in general needed to be communicated more effectively and

63 Ibid at p F-1. 64 Ibid at p F-17. 65 Little, Arthur D. Safety Evaluation of the Tosco Avon Refinery in Martinez, California; Final Report to the Contra Costa Health Services. May 10, 1999; p ES-1. 66 Ibid at p 7. 67 Ibid at p 34. 68 Ibid at p 34.

CSB • Tesoro Martinez Case Study 45 actively throughout the organization.69 To improve safety culture the evaluation team recommended that Tosco, among other things, develop and distribute a safety and health newsletter that emphasized safety performance and lessons learned, and that the refinery should increase the staffing levels and visibility of the refinery’s Health and Safety Department.70

Arthur D. Little conducted a follow-up assessment of the refinery in April 2001. Ultramar Inc.71 (“Ultramar”) purchased the refinery on September 1, 2000, and owned the refinery at the time of the 2001 evaluation. The goal of the assessment was to review progress made in implementing recommendations from the initial 1999 safety evaluation. The follow-up assessment team found that in the area of safety culture there was a “dramatic change in the attitudes and perceptions of the refinery workforce” since the original evaluation and described the difference as “like night and day.”72 The team found that results of incident and near miss investigations, general facility health and safety information, audits and process hazards analysis results, safety policies, and mission and vision statements were being communicated effectively and consistently.73 Ultramar management personnel were found to be firmly committed to core safety values including the mission statement, and were recognized as role models for good safety management.74 In addition, four positions were created in the Health and Safety Department and worker statements from CSB interviews showed they were a valuable addition.75

Tesoro acquired the Martinez refinery in 2002 and conducted its own safety culture surveys in 2007 and

  1. Following the Baker Panel approach, each survey administered 65 process safety specific questions

grouped into six categories: process safety reporting; safety values/commitment to process safety; supervisory involvement and support; procedure and equipment; worker professionalism/empowerment; and process safety training.76 The Baker Panel concluded that survey data (such as the data collected through Tesoro’s surveys) does have limitations, stating that “[s]urvey data generally reflect impressions, beliefs, and opinions of the group being surveyed,” and “[…] the [Baker] Panel does not construe survey responses as facts, but as data providing insights into perceptions of refinery personnel concerning process safety culture in their refineries.”77

The Baker Panel believed that responses “to a survey relating to process safety, which involves potentially catastrophic accidents, should be viewed differently from workforce surveys generally.”78 The Baker Panel also concluded that: “Given the importance of process safety to the well-being of a refinery workforce and the community in which a refinery is located, the [Baker] Panel believes that it should use

69 Ibid at p 16. 70 Ibid at pp 18 through 25. 71 Ultramar Inc. is a wholly owned subsidiary of Ultramar Diamond Shamrock. 72 Little, Arthur D. Follow-up Safety Assessment of the Ultramar Golden Eagle Refinery in Martinez, California: Draft Report to Contra Costa Health Services. May 21, 2001; p ES-3. 73 Ibid at p 9. 74 Ibid at p 14. 75 Ibid at p 16. 76 Baker III, James, A. et al. The Report of the BP U.S. Refineries Independent Safety Review Panel. January 2007; p 8. http://www.csb.gov/assets/1/19/Baker_panel_report1.pdf (accessed June 14, 2016). 77 Ibid at p 9. 78 Ibid at p 10.

46 CSB • Tesoro Martinez Case Study more stringent criteria, or effectively “raise the bar,” in its evaluation of the process safety culture survey data.79 Rather than taking a view that any particular level of “positive response rates are acceptable, favorable, or ‘good enough,’ the [Baker] Panel believed it was important to view more critically departures from 100 percent positive response rates.”80

Much of the information covered in the remainder of this report section (Section 5) describes negative results and worker comments to Tesoro’s 2013 process safety culture survey that represent clear departures from 100 percent positive response rates. These negative results and comments presented also support worker statements made to the CSB following the 2014 sulfuric acid release incidents in the alkylation unit; however, it is important to acknowledge that Tesoro’s safety culture surveys, which covered all workers at the refinery, also include many positive results and worker comments. Similar to the Baker Panel, the CSB “has focused necessarily on identified shortcomings” not “to present an unbalanced view of process safety culture” at the Tesoro Martinez refinery, “but rather to highlight areas for potential improvement.”81

Tesoro’s 2013 safety culture survey results, however, do indicate several areas of strength. For example, Tesoro outperformed the typical refining industry benchmarks to a statistically significant degree in the following areas where workers believed:  Within their work group, process safety concerns are more important than achieving production goals;  In areas of process safety, they can challenge decisions made by their supervisors without fear of a negative consequence; and  That they knew how to access appropriate process safety resources if needed. In addition, the Tesoro Martinez refinery exceeded or matched “best-in-class” refining industry benchmarks in two areas where workers believed:  That their process safety training has provided them with the ability to recognize when a process should be shutdown, if safety critical process safety equipment fails or is not available; and  That they felt responsible of identifying process safety concerns at the refinery.

79 Ibid at p 10. 80 Ibid at p 10. 81 Ibid at pp 10 and 11.

CSB • Tesoro Martinez Case Study 47 Examples of positive comments made by workers in Tesoro’s 2013 process safety culture survey include:

“I have worked in every refinery in the Bay area and I can truly say that I feel excited and glad on coming to work every day. At this refinery I get my safety concerns addressed and resolved and I am recognized for my hard work. Here I feel empowered and I can make a difference.” “This company demonstrates a strong commitment to safety.” “I have worked in all of the Bay Area refineries and here at GER [Golden Eagle Refinery] when it was Tosco. The safety culture here now has changed dramatically from the Tosco days and I believe now it is the best of all of the Bay Area refineries.” “I can tell you that today in contrast to the Tosco days, we are doing very well concerning safety. Thank you!!” “I believe that the supervisors do a good job of walking the walk and talking the talk and get the people in their departments involved and onboard process safety.” “Training around here is very high, this is one of the safest places I worked at.” “Like to thank all the supervision from the top to the bottom. Everyone seems to be on the same page, it's a fun and safe place to work. Thank you.” “Top of the industry standards at Golden Eagle. One of/if not the best place to work in all of the industry.” Following the February and March incidents, however, some alkylation unit workers stated to the CSB that they believed the alkylation unit to be the most difficult and dangerous unit to work in – a unit that employees feared and actively tried to transfer out of – and where many of the workers were assigned straight out of initial new-hire training. One worker in particular confirmed that “nobody” wants to work in the alky plant, though he himself wanted the job there to help “control the dangerous environment.” Thus, some differentiation must be made between positive worker perception and opinion comments related to general safety issues and even noted improvements that might be relevant to the overall operation of the refinery, versus the situation within the alkylation unit, the hazards specific to operations within it, and the repeated sulfuric acid accidents and other safety issues that alkylation unit workers described to the CSB, which were the focus of the CSB’s investigation.

Although considerable resources are typically needed to conduct a safety culture assessment, Tesoro did not follow through on its commitment to develop an action plan to strengthen areas of perceived weaknesses identified in the 2007 survey. The 2007 survey results showed that Tesoro management provided more favorable responses to questions in all six categories than all other types of workers at

48 CSB • Tesoro Martinez Case Study Tesoro. Furthermore, the 2007 survey showed there was a less favorable response overall, by the Martinez refinery as measured among the company’s other refineries in the following areas:  Workers are informed about the results of process related incident, accident, and near miss investigations;  Workers at all levels of my location actively participate in incident and accident investigations; and  Workers at this location feel pressured to work considerable overtime from their own sense of loyalty to their operating units. When asked, “What suggestions do you have for improving process safety at Tesoro?” the top responses were:

  1. Procedures and equipment
  2. Process Safety Training
  3. Safety Values / Commitment to Process Safety

Some employee written comments indicated that the refinery was perceived as having inadequate resources dedicated to keeping procedures updated and to repairing damaged equipment. Some workers stated that in their opinion management placed inadequate emphasis on process safety training and the refinery demonstrated more commitment to production than to process safety. Written comments also consistently expressed strong disagreement over the refinery’s reduction for safety department staffing. Tesoro’s 2013 safety culture survey identified numerous areas where the refinery could strengthen its process safety programs. Once again, workers provided significantly less favorable responses to questions than management. Tesoro’s results showed the refinery safety culture performance was significantly less favorable in all six categories than “best-in-class” refining industry benchmarks. In addition, Tesoro underperformed the typical refining industry benchmarks to a statistically significant degree in four of the six process safety categories:  Worker Professionalism and Empowerment;  Safety Values and Commitment to Process Safety;  Process Safety Reporting; and  Procedures and Equipment.

CSB • Tesoro Martinez Case Study 49 In addition, the least favorable results from the 2013 survey indicate workers believed:  There was pressure to work considerable overtime from management, supervisors, and due to loyalty;  The commitment to process safety was more words than action;  Equipment was not regularly tested, maintained, or properly restored as soon as possible; and  A culture at the refinery that encouraged raising process safety concerns did not exist. Compared to the 2007 survey results, the 2013 survey showed statistically significant declines in areas where workers believed:  Process equipment was not being regularly maintained;  Disabled or failed process safety devices were not restored to service as soon as possible;  Long-term process safety improvement was compromised by short-term financial goals;  Refinery management does not put a high priority on process safety through actions; and  Formal hazard assessments were not always performed to ensure that changes affecting processes will be safe. Some employee written comments indicated that workers were concerned that positive gains in the safety culture at the refinery since the 1999 Tosco incident had been lost and the refinery safety culture had deteriorated. Such worker comments included: “This refinery has become Tosco all over again. We are back to the days of do not fix it until it burns up or blows up. A refinery cannot operate safely when it is being run from the corporate office. It all comes down to money and the bottom line. Save the dollar now by not fixing equipment, so the books will look good. The end result is that it costs us more in lost production when the units are down.” “At the Operator level you quite often hear ‘We are going back to Tosco.’ As I lived through that difficult time I can say we are not that bad yet, but there is certainly a shift towards that level of short term thinking. The real profit will come with sustained safe operations, where everyone goes home safely.” “… [W]e the workers in the field have a fear amongst us that we are back to the Tosco way of making money at the cost of lives.” “After more than 20 [years] of service in this refinery the attitude of middle management reminds me of the end days of Tosco.”

50 CSB • Tesoro Martinez Case Study As stated previously, despite identifying concerning findings from its 2007 survey Tesoro Martinez did not conduct any follow-up corrective actions. Following the February and March 2014 sulfuric acid incidents, Tesoro Martinez refinery employees informed the CSB that the refinery was working to develop action items stemming from the 2013 safety culture survey results, but plans to strengthen process safety at the refinery had not yet been adopted. The CSB is not aware of the status of those action items. In the Final Chevron investigation report, the CSB made a recommendation to Contra Costa County (CCC) to conduct more robust safety culture assessments with an oversight committee comprised of the regulator, the company, the company’s workforce and their representatives, and community representatives. The committee would not only administer periodic safety culture surveys, but would also oversee the development and implementation of action items to address identified safety culture issues. Such a process could help resolve safety culture deficiencies like those identified at the Tesoro Martinez refinery and help prevent future sulfuric acid releases. 5.2 Management Commitment to Worker Safety Andrew Hopkins noted in his book Safety, Culture and Risk that identifying and controlling hazards using systematic hazard identification procedures requires a “management mindset that every significant hazard will be identified and controlled and a management commitment to make available whatever resources are necessary to ensure that the workplace is safe.”82 The CSB found that the culture at the Tesoro Martinez refinery’s alkylation unit lacked a sufficient focus on process safety, which was causal to the February and March 2014 incidents. The following section addresses safety culture and human factors83 weaknesses that the CSB found contributed to the significant number of sulfuric acid release incidents at the Tesoro Martinez refinery in recent years. Site Ends Participation in Two Voluntary Worker Safety Programs In 2012, Tesoro ended the Martinez refinery’s participation in two voluntary worker safety programs – the United Steelworkers (“USW”) Triangle of Prevention Program84 (“TOP”) and the California Voluntary Prevention Program, or Cal/VPP.85 A spokesperson for Tesoro stated that safety indicators in

82 Hopkins, Andrew. Safety, Culture and Risk;. The Organisational Causes of Disaster. Sydney, New South Wales: CCH Australia Limited. 2005; p 6 (emphasis in original). 83 “Human factors refer to environmental, organizational and job factors, and human and individual characteristics which influence behavior at work in a way which can affect health and safety. A simple way to view human factors is to think about three aspects: the job, the individual and the organization and how they impact people’s health and safety-related behavior.” UK Health and Safety Executive. Introduction to Human Factors. http://www.hse.gov.uk/humanfactors/introduction.htm (accessed June 14, 2016). 84 The USW Triangle of Prevention Program is a joint union-management workplace safety program that applies the knowledge of the workforce to understand and eliminate workplace hazards. 85 Cal/VPP is a joint safety and health leadership program between management, workers, and Cal/OSHA, for fixed and non-fixed facilities in California. The federal program is known as the Voluntary Protection Program, or VPP. See https://www.osha.gov/dcsp/vpp/all_about_vpp.html for more information.

CSB • Tesoro Martinez Case Study 51 Tesoro's performance review made it technically ineligible to participate in the VPP.86, 87 The only indicators the CSB identified that are not permitted under VPP are indicators that could provide a disincentive for workers to report injuries, such as using recordable injuries as part of an incentive or bonus program. Some Tesoro workers believe dropping these programs demonstrated further deterioration in Tesoro’s commitment to process safety. Some workers made strong statements against dropping these two programs in their comments to the 2013 safety culture survey. Comments included:

“The VPP was on the right track for identifying Safety issues and offering corrective actions when it was discontinued. In 2+ decades in this refinery, VPP was the only safety program that I saw making a difference in the culture.” “We recently had the VPP, TOP programs removed from our facility. In my opinion, these were outstanding safety programs that brought to light many of the safety issues in our facility. With these programs in place, the safety culture improved greatly. Now they are gone.” “I think it is very sad that the company decided not to follow through on the VPP program. I think it sent a message that Tesoro was backing off a bit on its commitment to safety.” “I feel that the elimination of safety programs (TOP and VPP) and the company’s pursuit of the elimination of several Health and Safety positions show a growing neglect for safety at our refinery. If this attitude continues I believe our safety record will suffer and our employees will be more susceptible to injury in the near future.” Encouragement of near miss reporting is another measure of effective management commitment and leadership the ISO safety culture assessment guidance provides.88 Some alkylation unit workers, however, informed the CSB that a culture of blame exists at the refinery and consequently many less

86 Rogers, Robert. Tesoro bashed for dropping worker-safety programs at Contra Costa refinery where acid spills occurred. The Mercury News, March 12, 2014. http://www.mercurynews.com/marcus-thompson/ci_25323196/ (accessed June 14, 2016). 87 OSHA Instruction CSP 03-01-003 addresses incentive programs regarding an employer’s recording of injuries and illnesses. Chapter VI Onsite Evaluations, Section III.B.1. Subsections b. and g. note that incentive programs should promote safety awareness and worker participation in safety-related activities, and must not be the cause of under-reporting of injuries and illnesses. According to OSHA, a site whose incentive program has the potential to discourage worker reporting fails to meet the VPP’s safety and health management system requirements. See MEMORANDUM FOR REGIONAL ADMINISTRATORS, DIRECTORATES, AND FREE STANDING OFFICES, FROM DAVID MICHAELS. Revised VPP Policy Memorandum #5: Further Improvements to the Voluntary Protection Programs (VPP). August 14, 2014. See https://www.osha.gov/dcsp/vpp/policy_memo5.html (accessed June 14, 2016). 88 ISO Guidance Document F: Safety Culture Assessments. June 15, 2011; p F-17. http://cchealth.org/hazmat/pdf/iso/section_f.pdf (accessed June 14, 2016).

52 CSB • Tesoro Martinez Case Study severe incidents are not reported. Acid and caustic exposure incidents were identified as prime candidates for not being reported. If the exposure was minor, the acid or caustic could be readily washed off, and if there were no management witnesses to the incident, alkylation unit workers believed the incident would not likely be reported. Some workers felt Cal/VPP was driving important safety improvements. For example, the Cal/VPP efforts identified that there were significant gaps between corporate standards and Tesoro Martinez site- specific procedures. One such gap was that the Tesoro Martinez procedure permitted the cutting of piping that was isolated from the process using only a single isolation valve, such as the butane piping involved in the March 10, 2014 incident that injured two workers, yet the Tesoro corporate standard prohibited this approach. PSM compliance audits conducted by Tesoro in 2009 and 2012 did not identify this gap. In addition, some workers raised issues with procedures in their comments to the 2013 safety culture survey.

[Refinery] Rules and Standing Instructions are difficult to use (locate specific Information) and therefore not adequately used as a decision making tool. They are often mis-quoted. The VPP was on the right track for identifying these issues and offering corrective actions when it was discontinued. Pressure to Operate with Unstable Conditions Some Tesoro Martinez alkylation unit operators said there is a “constant battle” with management wanting to cut acid feed to the alkylation reactors. Acid runaways are a significant concern with sulfuric acid alkylation units and can occur when acid concentrations fall below the operating limit. At these low acid strength conditions undesired reactions cause unstable plant conditions that are commonly referred to as “acid runaways.” Acid runaway events cause loss in alkylation capacity and a potential for equipment damage that results in a loss of primary containment. Operating at low acid strengths that are close to the operating limit is, however, more economical. As a result, there is a financial incentive to operate with lower acid strength. According to alkylation unit operators, Tesoro management had been trying to achieve more economical operation and was routinely pushing operators to run near these limits. In theory, there is nothing wrong with this type of approach, provided it can be done safely. Operators stated, however, that they believed existing alkylation unit controls were not sufficient to manage the process at the edge of safe operating parameters and the unit was not stable at these low acid strength conditions. Contra Costa County’s inspection report conducted following the February 2014 acid release incident noted that Tesoro’s alkylation unit operating manual indicates that “‘Acid Runaway’ episodes have occurred at the Golden Eagle unit a number of times.” Tesoro workers informed the CSB that the refinery experienced recent acid runaway incidents in October 2013 and in January 2014. Workers stated to the CSB that these incidents also resulted in accelerated corrosion and leaks in the spent acid piping system that contributed to worker injuries from sulfuric acid burns. In contrast, when the CSB evaluated other nearby refineries with sulfuric acid alkylation units, investigators were shown more advanced control systems and other significant technology improvements. These systems provided economical operation while retaining sufficient control to avoid acid runaway incidents.

CSB • Tesoro Martinez Case Study 53 Some worker comments to the 2013 safety culture assessment also reflected pressure from site supervisors. One worker wrote:

Pressure from our supervisors, everything is easily said in safety meeting (safety is #1, take time to do work safely). But when you are out in the field you are pushed and safety is overlooked. Cycle of Worker Injuries and Pressure to Fill Positions Tesoro reported that its worker safety performance in 2013 was the best in the history of the refinery, “with the equivalent of three recordable injuries in approximately 3.5 million working hours.”89 For a variety of reasons that included numerous injuries to alkylation unit workers, however, at the time of the March 10, 2014 incident only six of the 12 operator positions were filled. Alkylation unit workers told the CSB that injuries in 2013 resulted in pressure to fill the gap with overtime, which resulted in some workers having as many as 1,300 hours of overtime in 2013 as they filled the roles of their injured coworkers. In addition, Tesoro records show that in 2013 workers in the alkylation unit averaged nearly 800 hours of overtime, more than any of the other 15 units within the refinery and 180 percent above the refinery average. The ISO guidance for safety culture assessments calls out allocation of adequate resources to perform work safely as another focus area to evaluate effective management commitment and leadership.90 Due to the limited number of qualified operators in the alkylation unit, Tesoro attempted to reduce the required staffing to do some jobs, which would then increase the operator workload. Some alkylation unit operators who perform these tasks stated they strongly believed that in some situations, Tesoro has gone too far and the low staffing level resulted in unsafe conditions. As a result, some operators informed the CSB that they have resorted to signing documents “under duress” or something equivalent to communicate their disagreement with the modifications. Some operators stated that due to the low number of qualified operators in the alkylation unit, they have perceived tremendous pressure to expedite training to get qualified for the alkylation operator position. The CSB learned that while senior operators who qualified six to seven years ago typically had up to 12 months of training in order to get qualified, Tesoro more recently pressured operators to qualify in as little as 44 days. Some alkylation unit operators believe this pressure contributed to at least two of the recent operator injuries that occurred during training. Including the February 12, 2014 incident, alkylation unit workers informed the CSB that there were four operator injuries in the previous six months during training in the alkylation unit. One worker stated, “But the problem is they're out there busting their butts trying to get qualified, trying to avoid getting written up, because you've got this 44-day window you're

89 Rogers, Robert. Tesoro bashed for dropping worker-safety programs at Contra Costa refinery where acid spills occurred. The Mercury News, March 12, 2014. http://www.mercurynews.com/marcus-thompson/ci_25323196/ (accessed June 14, 2016). 90 ISO Guidance Document F: Safety Culture Assessments. June 15, 2011; p F-17. See http://cchealth.org/hazmat/pdf/iso/section_f.pdf (accessed June 14, 2016).

54 CSB • Tesoro Martinez Case Study giving them.” Some comments workers made in the 2013 safety culture assessment also reflected the intense pressure to complete training. “Add the 3 hours of cross-training we are responsible for each day and that doesn't leave much for time for getting familiar and really learning the unit. This is the pressure I feel as an operator. My stress level has increased significantly. With this added stress and constant pressure from the supervisor put in charge of training, I could easily not be focused on safety while performing my job as an operator.” “Stop rushing training and pressuring people to qualify on their positions. I feel like I'm training with a gun to my head. I used to love this job, now I hate this place. Someone is going to get hurt because I'm so worried about losing my job that I'm willing to have my qualification ‘pencil whipped.’” Communication of Safety Issues Another area the ISO guidance identifies to evaluate management commitment and leadership is management’s emphasis on communication of safety issues.91 Alkylation unit operators expressed concern to the CSB that Tesoro’s inspection department does not inform them of significant mechanical integrity issues, such as when they identify piping below its minimum required thickness. As a result, operators believe they may spend time near potentially dangerous equipment. Operators have requested that management inform them of these potential hazards so they can minimize their exposure, but alkylation unit workers indicated that this has not always occurred. Workers stated to the CSB that following the multi-fatality Tosco incident, many improvements were made. For example, health and safety staffing increased to provide full 24/7 coverage. Since Tesoro purchased the refinery, however, some workers believe that the health and safety department positions were cut and workers stated that many shifts now operate without health and safety coverage. One worker summarized their understanding of the staffing changes as, “[w]e hired all these health and safety guys and now they're cutting those people back.” As previously stated, some workers cited the deterioration of the health and safety department in their 2013 safety culture comments to support their view that Tesoro was not committed to worker safety. Pressure on Operators to Prepare Jobs for Maintenance Tesoro alkylation unit operators informed the CSB that work delays have occurred when maintenance workers arrive to obtain a permit to perform a job and the operators have not already prepared the job for maintenance. Equipment preparation is time consuming. It typically involves removing hazardous materials, washing, draining, purging, and locking out to make the equipment safe prior to issuing a work permit. Tesoro developed a “permit readiness” program to help maximize the efficiency of maintenance

91 Ibid at p F-17.

CSB • Tesoro Martinez Case Study 55 work. Through this program, Tesoro provides the night shift operators a list of work tasks planned for the following day, so they can prepare the jobs for maintenance. The intent of this program is to increase maintenance efficiency on the day shift. With this system, a day shift operator should only need to verify the job is prepared, rather than actually conducting the preparations. This allows night shift operators to make the equipment safe and mitigate the time pressure that day shift operators would typically experience. The idea was simple enough, but Tesoro alkylation unit workers described it as a “failed system.” According to alkylation unit operators, the primary problem is that Tesoro only informed night shift operators about 25 percent of permits requiring safe equipment preparation. As a result, day shift operators still experienced pressure to prepare many jobs for maintenance that could have been prepared during the previous night shift. Operators believe that not having permits ready when maintenance workers arrive to perform work developed into a significant problem at the alkylation unit. When maintenance workers cannot get a permit because they arrive at the control room and find a long line of workers already awaiting a permit, they inform their supervisor about the work delay. Rather than effectively addressing the problems with the permit readiness program, alkylation unit operators informed the CSB that operations supervisors directed the problem back to the operators and put pressure on the operators to get the jobs prepared faster. The perception that operators held up maintenance work also escalated to investigations where operators stated that management critically assessed their performance. “Just over and over, investigation after investigation. Why are you holding work up?” “And so it's always a constant of people trying to run around trying to find ways to make things go faster. And we always find ourselves back at square one trying to do it back right, the way it should be.” “I'll have 15 or 20 permits out on a day, or there'll be a line at 7:00, 8:00 in the morning, there'll be a line out the door of people waiting and I'm just one person.” The problem culminated in the March 10, 2014 incident when sulfuric acid sprayed two contract workers and sent them to the hospital. The job the workers were performing at the time was not on the permit readiness sheet as requiring a hot work permit (Figure 20).

Figure 20. Tesoro’s Permit Readiness Sheet. This is an excerpt from the permit readiness sheet provided to operations to communicate what maintenance work permits were needed on March 10, 2014. As indicated on the sheet, only a safe work permit was planned, while the butane pipe cutting actually required a hot work permit that required the operator to perform additional and unexpected work.

56 CSB • Tesoro Martinez Case Study When the maintenance supervisor arrived and needed a hot work permit instead of a safe work permit, the alkylation unit operator conducted a walk-through with the supervisor, reviewed the lockout, opened the drain valve, and checked for hydrocarbons. Workers indicated that jobs were beginning to “pile up,” however, and workers felt pressured to keep other maintenance jobs moving. Therefore, the operator issued the permit and turned his attention to the next job, which like many other work tasks, was also not on the permit readiness sheet. As previously discussed, when asked why operators might not take the time to perform extra steps that could be prudent in order to ensure a system was effectively drained, one operator stated that such actions would be “frowned upon by management.” He also noted that he would be “questioned by management” as to why he was taking those potentially unnecessary additional precautions, despite the fact that such actions could have protected workers. In light of the difficulties with the permit readiness program, and resulting pressure on workers, a picture begins to emerge with respect to why supervisors might frown upon safety activities and additional precautions.

In the end, Tesoro did not effectively prepare the butane piping prior to issuing the hot work permit for maintenance, as required by the Tesoro corporate blinding and isolation standard. Tesoro used a single valve to isolate the piping from the butane still flowing to other operating reactors. The piping was under pressure and was not flushed and drained to remove hazardous residual chemicals. These omissions led to the March 10, 2014 incident. Instead of taking the time to prepare the job for maintenance more effectively, Tesoro relied on PPE, a weaker safeguard to protect against potential hazardous material inside the pipe, the failure of which led to the contract workers’ injuries.

The safety culture at the Tesoro Martinez refinery’s alkylation unit did not support the safer course of action, involving additional steps such as blinding the piping on the butane side, verifying drain valves were open and free of plugging material, and flushing the line to ensure it was free of residual hazardous chemicals. This is true despite the fact that the line typically carried butane, and that there were several documented instances of sulfuric acid getting back into the line – either of which, if present, posed a clear hazard to the two contract workers engaged in pipe cutting operations on March 10, 2014.

CSB • Tesoro Martinez Case Study 57 6.0 The Role of the Regulator 6.1 Proactive and Preventive Inspections The CSB noted in the Chevron Regulatory and Tesoro Anacortes investigation reports that robust preventive inspections and audits by a technically qualified regulator are necessary to encourage industry to adopt safer practices and to reduce risks to as low as reasonably practicable, or ALARP. To facilitate continual improvement the regulator should have the flexibility to work with facilities to ensure the implementation of recommendations and lessons learned from significant petroleum refinery incidents without requiring extensive rulemaking or legislation, as regulators have done post-incident in countries such as the United Kingdom, Norway, and Australia. The regulator should also have the ability to examine previous incidents and require that refineries use the hierarchy of controls to identify hazards and reduce risks to ALARP or similar. The CSB found in its investigation of the Chevron Richmond fire that the California process safety management (PSM) regulator Cal/OSHA lacked the resources to conduct sufficient preventive inspections of petroleum refineries in California. In Chevron and Tesoro Anacortes, the CSB made recommendations to California and Washington to increase regulatory staffing and enhance their process safety management regulations through preventive inspections, the use of hierarchy of controls, and risk reduction to ALARP or similar. At present, California has increased enforcement funding and staffing and is working to strengthen the process safety management regulations that empower the regulator to be more proactive. Washington is holding regular PSM advisory meetings to discuss PSM reform and requested a budget increase to fund additional PSM inspectors for the state. The budget increase request was not approved; however, the CSB remains encouraged that Washington is continuing to work to improve its PSM regulations and oversight for petroleum refineries. The acid sampling station at the Tesoro Martinez refinery is a simple example of the potential for safety improvement this approach can create. The California PSM regulator Cal/OSHA and the Contra Costa County regulator could have observed the sample stations at Tesoro Martinez and other refineries in the course of their preventive inspection programs. Depending on the nature of the regulator’s powers, the regulators should have the authority to direct or encourage the adoption of safer designs in light of better practices elsewhere. In addition, an adequately resourced, empowered regulator likely could have been more aware of and examined the many sulfuric acid incidents at the Tesoro Martinez refinery, especially because they shared many commonalities and involved unnecessary worker exposure to sulfuric acid. This awareness could have triggered additional review and evaluation of the refinery’s safety systems and sulfuric acid equipment and ideally, the regulator could require the use of the hierarchy of controls to achieve greater risk reduction and accident prevention.92 In its inspection report following the February 12, 2014 sulfuric

92 The CSB expressed concern that the most recent draft PSM Regulations in California require a refinery to perform a hierarchy of controls analysis for process hazard analysis (PHA) recommendations, but only if they are associated with the potential for a “major incident.” The CSB noted that this limits the scope and may preclude the use of a hierarchy of controls analysis as a risk reduction tool. While not all of the many sulfuric acid incidents at the Tesoro Martinez refinery were considered “major,” they still resulted in worker injuries and spoke to serious safety culture deficiencies that the regulator could have identified and addressed prior to the February and March 2014 sulfuric acid incidents. See the CSB’s comments on the State of California Department of Industrial Relations (DIR) Division of Occupational Safety and Health Proposed GISO § 5189.1, Version 5.0.

58 CSB • Tesoro Martinez Case Study acid release incident that injured two workers, Contra Costa County did identify better sulfuric acid sampling practices that they observed post-incident at other refineries and recommended that Tesoro adopt these safer sampling practices. 6.2 Process Safety Indicators and Incident Investigations In the CSB Chevron Interim, Regulatory, and Final investigation reports the CSB discussed the importance of collecting and analyzing leading and lagging process safety indicators to help drive ongoing process safety improvement. Process safety indicators are a significant element of process safety management systems as they measure the strengths and weaknesses of these systems to achieve and maintain safe and reliable operations.93 Effective regulators can use lagging indicators, such as spills, fires, or gas releases, as well as leading indicators such as timely maintenance on safety critical equipment to focus inspections, audits, and timely closure of action items resulting from incident investigations to help drive safety improvement. As a result of the Chevron investigation the CSB made recommendations to the State of California, Contra Costa County, and the City of Richmond to develop a system that collects, tracks, and analyzes process safety leading and lagging indicators from refineries to measure major accident prevention performance and to promote ongoing safety improvement. Contra Costa County revised the Industrial Safety Ordinance (ISO) in 2014 to require covered refineries to publicly report process safety performance indicators annually.94 At the time of the February and March 2014 incidents at the Tesoro Martinez refinery, Tesoro was not required to report indicators to the regulator, nor did they voluntarily make them publicly available. The CSB has urged the State of California to require refineries to develop and report process safety indicators, particularly leading indicators that can identify process safety management issues prior to a negative outcome and allow the regulator to determine overall trends in safety and risks at California refineries, as well as the effectiveness of their own enforcement efforts. This report details missed opportunities for Tesoro Martinez refinery management to implement lessons learned from previous incident investigations and recommendations. A proactive regulator’s robust collection and assessment of leading and lagging process safety indicators such as the numerous sulfuric acid releases that occurred between 2010 and 2014 and a review of investigations into these incidents may have led to an increased focus on employee exposure to acid at the Tesoro Martinez refinery. The numerous incidents at the alkylation unit could also have illuminated leading indicators of an impending major chemical accident.95 Ultimately, a more proactive focus on implementing corrective actions and lessons from previous sulfuric acid incidents could have helped to prevent the February and March sulfuric acid incidents.

October 7, 2015. http://www.csb.gov/assets/1/7/CSB_Comments_California_PSM_Draft_Regulations_5.0_Oct_7_2015(2).pdf (accessed June 20, 2016). 93 CSB Regulatory Report. Chevron Richmond Refinery Pipe Rupture and Fire. October 2014; p 58. http://www.csb.gov/assets/1/19/Chevron_Regulatory_Report_11102014_FINAL_-_post.pdf (accessed June 14, 2016). 94 County Ordinance Chapter 450-8.016 (13)(D). May 6, 2014. http://cchealth.org/hazmat/pdf/iso/Chapter-450-8-RISK- MANAGEMENT.pdf (accessed June 14, 2016). 95 According to API, Tier 2 Process Safety Events (such as the March 10, 2014 incident) “indicate barrier system weaknesses that may be potential precursors of future, more significant incidents…[and] can provide a company with opportunities for learning and improvement of its process safety performance.” API. Recommended Practice 754: Process Safety Performance Indicators for the Refining and Petrochemical Industries. April 2010; p 11.

CSB • Tesoro Martinez Case Study 59 7.0 Conclusion Significant process safety culture deficiencies contributed to a pattern of sulfuric acid exposure incidents that occurred at the Tesoro Martinez refinery’s alkylation unit between 2010 and 2014, including two incidents that occurred in February and March 2014 that injured four workers in total and in one instance led to a significant release of sulfuric acid. These deficiencies included Tesoro’s postponement of efforts to make safer sulfuric acid sampling systems functional, tolerance of worker exposure to sulfuric acid and caustic during sampling, weaknesses in nonroutine maintenance work practices, policies, and procedures, and failure to address issues identified in safety culture surveys. In addition, Tesoro did not effectively address and/or maintain lasting safeguards to prevent major accidents, and did not adequately learn the important process safety lessons.

Furthermore, safety culture assessments, such as those presently required for petroleum refineries and chemical manufacturing facilities in Contra Costa County, California, can provide critical insight into cultural weaknesses that may contribute to process safety incidents. Simply identifying safety culture deficiencies, however, is not sufficient. Effective continual improvement programs are necessary to address safety culture weaknesses in order to prevent significant accidents, worker injuries, and the potential for community impact. The CSB encourages Tesoro to strengthen its process safety management systems and overall safety culture in order to address the significant process safety issues this case study identifies to protect workers and reduce future accident risks.

Finally, these incidents also demonstrate the importance of the collection and analysis of process safety indicators and the conduct of preventive inspections by the regulator to ensure refineries are implementing good safety practices to reduce accident risk to ALARP. Preventive inspections are critical to ensure effective implementation of corrective actions following accidents.

60 CSB • Tesoro Martinez Case Study Appendix – Causal Analysis AcciMap

FD06470 | 2014_美国_West 肥料 爆炸 与 火灾 - West Fertilizer Explosion and Fire__最终报告_5.pdf

分类:06_境外及港澳台调查报告 | 年份:2014 | 地域: | 严重程度: | 场所: | 起火原因:燃气/爆炸 | 来源格式:pdf

Page 1 202-234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. U.S. CHEMICAL SAFETY BOARD

WEST FERTILIZER EXPLOSION AND FIRE

PUBLIC MEETING

THURSDAY, APRIL 22, 2014

U.S. CHEMICAL SAFETY BOARD MEMBERS PRESENT: RAFAEL MOURE-ERASO, Ph.D., Chairperson, U.S. Chemical Safety Board MARK A. GRIFFON, Member, U.S. Chemical Safety Board BETH J. ROSENBERG, Sc.D., M.P.H., Member, U.S. Chemical Safety Board

Page 2 202-234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. STAFF PRESENT: DANIEL M. HOROWITZ, Ph.D., Managing Director RICHARD C. LOEB, General Counsel JOHNNIE BANKS, CFEI, Supervisory Investigator *HILLARY COHEN, Communications Manager JERAD DENTON, Esq., Investigator RACHEL GUNARATNAM, Investigator *AMY McCORMICK, Contracting Officer SAMUEL OYEWOLE, Ph.D., Investigator This transcript produced from audio provided by the U.S. Chemical Safety Board.

Page 3 202-234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. TABLE OF CONTENTS Item Page Opening Statement 4 Presentation of Csb's Preliminary Findings 8 Board Questions 44 Emergency Response Panel 47 Land Use Planning Panel 105 Public Comment 171 Closing Statement 213

Page 4 202-234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. 1 P R O C E E D I N G S 2 (6:30 p.m.) 3 CHAIRPERSON MOURE-ERASO: Good 4 evening and welcome to this public meeting of 5 the U.S. Chemical Safety Board, or the CSB. 6 I would like to recognize among other people 7 that came to this that we really are very 8 appreciative of coming from the town. 9 I would like to especially 10 recognize Mayor Tommy Muska, who is going to 11 say some words for us in the middle of the 12 program, and I am going to call on him. So 13 thank You Mayor Muska for being here with us. 14 My name is Rafael Moure-Eraso, I 15 am the Chairperson of the Chemical Safety 16 Board. And with me today are our board 17 members, Mr. Mark Griffon and Dr. Beth 18 Rosenberg. 19 Also to my right is the general 20 counsel of the Chemical Safety Board, Mr. 21 Richard Loeb. And to my left is the 22 investigator -- investigation team of the West

Page 5 202-234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. 1 incident here in town. I'm going to name them 2 at the end of our remarks, and he will 3 introduce directly himself and the team. 4 The organization, the CSB is an 5 independent non-regulatory Federal agency 6 based in Washington, D.C. that investigates 7 major chemical accidents at fixed facilities. 8 As it was, the incident here in West. 9 The investigations exam all 10 aspects of chemical actions, including 11 physical causes related to equipment design, 12 as well as inadequacies in regulations, 13 industrial standards, and especially safety 14 management systems. Ultimately, we use safety 15 recommendations based in our findings which 16 are designed to prevent similar accidents in 17 the future, at least in the sector where the 18 accident took place. 19 Before we begin, I would like to 20 point out some safety information. Please 21 take a moment to know the locations of the 22 exits. There is a back exit where you came

Page 6 202-234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. 1 in, and there are some exits on the sides if 2 there were be an emergency. It should be 3 taking note of that. I also will ask that you 4 please mute your cell phones so that these 5 proceedings are not disturbed. 6 The CSB is here this evening to 7 discuss the failures that led to the tragic 8 fire and explosion that occurred here in West, 9 Texas on April 17, 2013. Before we get 10 started, I would like to ask Board Member Mark 11 Griffon, to speak the names of the individuals 12 who lost their lives protecting their 13 community, and were victims of the actions. 14 And then have a brief moment of silence. 15 So, Board Member Griffon please. 16 MEMBER GRIFFON: Morris Bridges, 17 Perry Calvin, Jerry Chapman, Cody Dragoo, 18 Kenny Harris, Jimmy Matus, Judith Monroe, Joey 19 Pustejovsky, Cyrus Reed, Mariano Saldivar, 20 Kevin Sanders, Doug Snokhous, Robert Snokhous, 21 William "Buck" Uptmor, Jr., Antoine Lennard. 22 CHAIRPERSON MOURE-ERASO: So I

Page 7 202-234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. 1 will ask for a moment of silence in 2 remembrance of the victims of the explosion. 3 Thank you Board Member Griffon. 4 Our hearts go out to the victims and the 5 victims' families of this tragedy. At least 6 15 people died a year ago, mostly as you know 7 volunteer firefighters that perished trying to 8 do their job. We do not take away from their 9 heroism in the least by finding that they were 10 not fully aware of the risk of an explosion as 11 it happened. 12 Today's presentation will include 13 a review of the preliminary findings by the 14 investigator in charge, Johnnie Banks and then 15 we'll hear from two expert panels during the 16 evening. And they will be introduced during 17 the program to discuss issues of emergency 18 response and live land use planning. I will 19 be introducing the panels after the 20 presentation of the CSB from Mr. Banks and the 21 investigative team. 22 So I will ask to call on Mr. Banks

Page 8 202-234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. 1 to introduce his team and to continue with the 2 program. Thank you. 3 I've been reminded that I skipped 4 introducing some. Also the Board Members have 5 some short statements they would like to say. 6 Sorry, okay. So Board Member Rosenberg 7 please. 8 MEMBER ROSENBERG: Thank you 9 Chairman. I want to offer my condolences to 10 the friends and families of those who died. 11 I offer sympathy to those who were injured 12 here. And to those who's injuries do not make 13 headlines, so those who's hearing is impaired 14 from the blast, who have been traumatized and 15 to those who simply lost the mundane 16 tranquility of their lives because of the 17 blase. 18 We have learned a lot about what 19 contributed to the tragedy. And you will hear 20 much information about the storage of ammonium 21 nitrate, zoning and citing of facilities 22 containing hazardous chemicals, the training

Page 9 202-234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. 1 of emergency responders, fire codes, 2 regulation and inspections. 3 If the lessons from West do not 4 cause any change in Texas and throughout the 5 United States, I would consider that a second 6 tragedy. I sincerely hope that the important 7 work that the Chemical Safety Board has done 8 in researching results in real changes. 9 I encourage you all to make that 10 happen. Thank you. 11 CHAIRPERSON MOURE-ERASO: Thank 12 you Dr. Rosenberg. Mr. Griffon. 13 MEMBER GRIFFON: Thank you Mr. 14 Chairman. I'd also like to express my 15 condolences to all the family and friends of 16 those who died in this tragedy, and to the 17 many who were injured. 18 The incident had a devastating 19 effect on the entire community. And I hope 20 that our investigation can lead to safety 21 changes to help prevent such tragedies in the 22 future. This is -- and it clearly devastated

Page 10 202-234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. 1 this community. But I hope that it serves as 2 a wake up call for what is a national issue. 3 My understanding is that there are 4 more than a thousand facilities like this 5 nationally. And I would venture to guess that 6 there are other types of high hazard 7 facilities located in close proximities to 8 communities, without the community having a 9 full appreciation of the risk posed. 10 Understanding where -- I'm sorry. 11 Understanding where these facilities are 12 located, and exactly what types of materials 13 they are storing and manufacturing, is very 14 important. But equally important is the 15 ability to do something with that information. 16 If a high hazardous facility is 17 located in your community, what can you do 18 about it. Are community and local emergency 19 responders equipped to handle a worse case 20 event? Are local and state emergency planning 21 commissions established, and are they active? 22 Are risk management plans required, and if so,

Page 11 202-234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. 1 are they being used? How can zoning and 2 siting rules be changed to assure communities 3 are safe from these hazards? 4 I'm interested tonight in hearing 5 from our team as well as from the expert 6 panels to help us grapple with some of these 7 questions. Thank you very much Mr. Chairman. 8 CHAIRPERSON MOURE-ERASO: Thank 9 you Mr. Griffon. Before proceeding, I would 10 like to ask Mayor Tommy Muska if he would like 11 to same some words. 12 MR. MUSKA: Chairman Eraso and the 13 Board, welcome you to the City of West. 14 CHAIRPERSON MOURE-ERASO: I'm not 15 sure if your microphone is on. 16 MR. MUSKA: Hello? 17 CHAIRPERSON MOURE-ERASO: It is, 18 okay. Go ahead. 19 MR. MUSKA: Mr. Chairman, Board 20 Members, I welcome you here to the City of 21 West. And I thank you for holding this 22 meeting here locally so the local citizens can

Page 12 202-234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. 1 hear your results. 2 I want to also thank you all for your 3 service to this country and for your vital 4 service regarding chemical safety. I want to 5 welcome everyone else here tonight to the 6 City. And I'm sure that tonight's information 7 will be of importance to you. 8 April 17 even was a tragic loss of 9 life and property. And will forever change 10 the face of West. It is my personal hope and 11 prayer that the lessons learned from your 12 report Chairman, will be enacted and measures 13 put in place, so then the loss of the first 14 responders lives will not have been in vain. 15 Again, I thank you very much for 16 being here, and I welcome every to the City of 17 West. Thank you Mr. Chairman. 18 CHAIRPERSON MOURE-ERASO: Thank 19 you Mayor Muska. Now we proceed with the 20 program. I ask Johnnie Banks, the 21 investigator in charge for the West Fertilizer 22 investigation, to take over and introduce

Page 13 202-234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. 1 himself and his team. 2 MR. BANKS: Chairman Moure-Eraso, 3 Board Member Griffon, Board Member Rosenberg, 4 Mr. Loeb, ladies and gentlemen, good evening. 5 We're prepared to present preliminary findings 6 from our investigation of the fire and 7 explosion which occurred at the West 8 Fertilizer facility in West, Texas. 9 This incident occurred on April 10 17, 2013, and resulted in 14 fatalities and 11 over 250 injuries, and widespread community 12 damage. Tonight's meeting will focus on 13 emergency response and land use planning 14 issues identified by the team at this stage of 15 the investigation. 16 It is important to mention at this 17 juncture, that these two categories discussed 18 tonight are by choice, and a subset of a 19 larger effort which is focused on prevention. 20 Before I start with the 21 proceedings I would like to introduce the 22 investigative team, which includes CSB

Page 14 202-234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. 1 investigators from both Washington, D.C. and 2 the western regional office located in Denver, 3 Colorado. There were many contributors to the 4 work on this investigation that are not here 5 tonight, including several investigators who 6 participated in the deployment activities 7 immediately following the explosion. 8 The core investigative team 9 consists of myself, Johnnie Banks, Jerad 10 Denton, Rachel Gunaratnam, Mary Beth Mulcahy 11 who can't joint us tonight, Samuel Oyewole, 12 Reba Schroff who is not here with us, and Lucy 13 Shallow-Tyler. 14 Not continuing, we'll start with 15 an overview of tonight's agenda. Members of 16 the CSB investigation team will briefly 17 describe the West incident and the emergency 18 response. 19 Next we will have our selected 20 panelists from the emergency response 21 community come forward and provide statements 22 and answer questions from the Board

Page 15 202-234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. 1 investigation team. We will then have a brief 2 15 minute intermission. 3 Following the intermission, 4 members of the investigation team will present 5 some of the team's findings on land use 6 planning. And we will invite our second set 7 of panelists to discuss related issues. And 8 also answer questions from the Board and 9 investigative team. 10 There will be a public comment 11 period for attendees interested in offering 12 comments for Board consideration related to 13 land use planning. 14 Finally, the team will discuss the 15 investigation path forward and list areas we 16 will examine prior to issuing a final report 17 on the West Fertilizer incident. We will now 18 move on to the investigation team presentation 19 of the incident and emergency response. 20 Consent with the CSB investigation 21 process, we have conducted an independent 22 investigation, and have interviewed key

Page 16 202-234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. 1 eyewitnesses, photo documented the scene, 2 collected physical evidence and conducted a 3 community walk through to survey and document 4 damage. 5 As you will see later, this 6 information was instrumental in documenting -- 7 in the documentation of damage to residences, 8 schools, and healthcare facilities. And was 9 useful in recreating likenesses of some of the 10 structures that were destroyed in the event. 11 In response to this incident, the 12 agency has participated in hearings before a 13 U.S. Senate Committee on Environment and 14 Public Works in June, 2013, where 17 15 preliminary findings were released. We've 16 also participated in activities related to the 17 Presidential Executive Order through attending 18 and contributing to listening sessions and 19 engaging in dialog with other agencies 20 similarly tasked with addressing the issue of 21 chemical site security. 22 Based on these findings, developed

Page 17 202-234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. 1 over the course of this investigation, the 2 team will develop root causes of the incident. 3 And recommendations to prevent reoccurrence at 4 other entities engaged in similar commerce. 5 Briefly, some of the previous 6 relief findings observed that the warehouse 7 was constructed of wood. That there was no 8 sprinkler system available for fire 9 suppression. That firefighters had very 10 little time to make snap decisions. And the 11 State of Texas had not adopted a statewide 12 fire code. 13 Now we will provide an incident 14 description. At about 7:30 on April 17, 2013, 15 the first documentation of the incident 16 started with calls received by 911. In 17 addition to the call to report the working 18 fire at the plant was made by a West police 19 officer. 20 The fire progressed through the 21 facility rapidly. Four units from the West 22 volunteer fire department responded in

Page 18 202-234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. 1 addition to mutual aid from fire companies 2 from nearby counties. Almost immediately, the 3 West volunteer responders began stinging hose 4 to fight the rapidly growing fire in the 5 fertilizer building. 6 Just 20 minutes after the first 7 notification was made to 911, a violent 8 explosion occurred. The time was about 7:53 9 p.m. The progression of the fire and the 10 explosion are captured in these series of 11 photos taken on the night of the incident. 12 Once the fire started, it burned 13 extremely intensely due to the presence of 14 ordinary combustibles such as seats wooden 15 bins that formed the container for the AN, and 16 asphalt shingles on the top of the roof of the 17 structure. The absence of sprinklers allowed 18 the fire to go rapidly with no abatement. 19 Finally, the AN involved in the fire was 20 likely decomposing and contributed to the 21 intensity of the fire before exploding. 22 In the aftermath of the explosion,

Page 19 202-234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. 1 14 fatalities were reported, including 12 of 2 the emergency responders and two members of 3 the community that resided at the apartment 4 complex located west of the plant. There is 5 a 15th victim that is attributed to this event 6 who expired in route to the hospital who had 7 a heart attack. 8 There were also more than 230 9 documented injuries to emergency responders 10 and members of the surrounding community. 11 Damage to housing, businesses, schools and 12 health care facilities was wide spread in the 13 West community afterwards. 14 In addition to the immediate 15 consequences, there were likely many, 16 undocumented long term effects to the members 17 of the community that was collective 18 traumatized after the incident. Though 14 19 fatalities were documented as a result of the 20 explosion, within hours of the blast, a 21 resident of a nursing home died of a heart 22 attack in route to the hospital as I mentioned

Page 20 202-234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. 1 earlier. 2 Investigators also became aware of 3 an increase in the number of deaths to a 4 nursing home residence in the days following 5 this incident. And we will consider linkage 6 to the fire and explosion and the role that 7 they may have played. 8 Despite not being classified as an 9 explosive, historically AN has exploded. In 10 examining previous incidents, the 11 unpredictability of AN when exposed to the 12 conditions of a fire such as the one that 13 occurred at West Fertilizer became evident. 14 Here is a list of some of the most 15 catastrophic ammonium nitrate explosions 16 documented globally for almost a century. 17 In 1921, an explosion at BASF in 18 Germany claimed between 500 and 600 lives, and 19 caused 2,000 injuries. In 1947, a ship 20 carrying 2,300 tons of wax coated AN exploded 21 in the port of Texas City, resulting in 581 22 fatalities and 5,000 injuries.

Page 21 202-234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. 1 The terrorist injury explosion 2 claimed four lives and lead to 18 injuries and 3 resulted in the release of 5,700 tons of 4 anhydrous ammonia. And in France an explosion 5 in 2001 resulted in 31 fatalities and 2,500 6 injuries. And in another explosion in 2003 26 7 were injured. 8 In 2009 there was an ammonium 9 nitrate fire at a similar facility in Bryan, 10 Texas, which had dramatically different 11 outcomes. This facility called El Dorado 12 Chemical Company stored 550 tons of AN. A 13 fire erupted at that facility. 14 Although the storage structure 15 burned to the ground, unlike the incident at 16 West there was no explosion, loss of life or 17 major injuries recorded. Firefighters 18 conducted cooling operations on nearby 19 structures and equipment remotely. 20 The comparison of the West 21 Fertilizer incident to the 2009 fire at El 22 Dorado fire in Bryan, Texas demonstrates the

Page 22 202-234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. 1 unpredictive nature of ammonium nitrate 2 exposed to burning conditions. In the case of 3 West, first responders had only 22 minutes to 4 access the situation and attempt to extinguish 5 the fire prior to explosion. 6 At the El Dorado incident, the 7 Bryan fire didn't arrive at the facility in 24 8 minutes after the initial 911 call was made to 9 report the fire. The first firefighter 10 arrived on the scene about nine minutes after 11 the first 911 call was made, noted that the 12 material involved presented an explosion 13 hazard. Due to a lack of water supply, 14 firefighters made the decision to let the 15 facility burn rather than attempt to fight the 16 fire and noted the explosion hazard. 17 It wasn't until one hour later 18 that the evacuation was ordered for the 19 surrounding facility. No explosion occurred 20 at El Dorado. 21 Of important note, the Bryan, 22 Texas facility rebuilt. When the rebuilding

Page 23 202-234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. 1 commenced non-combustible materials of 2 construction were used. 3 In consideration of the potential 4 for lessons learned, the CSB found that 5 previous incident leading to fatalities of 6 firefighters and emergency response to AN 7 incidents such as the case of the Bryan 8 incident, were not effectively disseminated to 9 firefighters and emergency responders in other 10 communities where AN is stored or utilized. 11 We'll now move on to the 12 characteristics of ammonium nitrate and a 13 description of the West Fertilizer facility, 14 storage and distribution process. 15 This is a wood bin -- or this 16 wooden bin is similar to the ones used at 17 West, which stored AN prills. The prills look 18 like the small white beads or pellets as shown 19 in the enlargement panel on the left side of 20 the screen. 21 This structure, the fertilizer 22 building, located on the West site, housed

Page 24 202-234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. 1 several of these wooden type bins that stored 2 a variety of chemicals used to make custom 3 fertilizer blends. 4 West Fertilizer was a storage and 5 retail distribution facility. They sold mixed 6 fertilizer, chemicals, farming supplies and 7 grain to the public. 8 AN was delivered by rail and 9 truck, and we delivered to the bins by a 10 conveyor belts and elevators. Custom blending 11 on site included ammonium sulfate, diammonium 12 phosphate and potassium sulfate. 13 At the time of the incident, and 14 based on interviews with employees, and 15 estimated 40 to 60 tons of ammonium nitrate 16 was stored in wooden bins in the fertilizer 17 building. The building itself was constructed 18 of wood and the roof was covered with asphalt 19 shingles. 20 There were two 12,000 gallon tanks 21 in the vicinity of the fertilizer building. 22 Finally there was a rail car positioned

Page 25 202-234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. 1 adjacent to the plant awaiting off loading 2 that held about 100 tons of AN that toppled as 3 a result of the explosion, but was otherwise 4 unaffected in the aftermath of the event. 5 I this virtual tour, we've been 6 able to recreate the West Fertilizer building 7 allowing a view of the building, and equipment 8 as configured on the day of the incident. The 9 bins are labeled with the materials that are 10 thought to have been present on the day of the 11 incident. 12 West Fertilizer was the storage 13 and retail distribution facility that sold 14 mixed fertilizer, chemicals, farming supplies 15 and grain to the public. This structure, the 16 fertilizer building, was constructed of wood 17 and housed a variety of chemicals used to make 18 custom fertilizer blends. Also on the site 19 were two 12,000 gallon anhydrous ammonia tanks 20 and a 100 ton rail care of ammonium nitrate. 21 Ammonium nitrate is delivered by 22 rail and truck and transferred into the

Page 26 202-234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. 1 storage facility by conveyor belts and 2 elevators. Other chemicals, such as ammonium 3 sulfate, diammonium phosphate and potassium 4 sulfate were also stored in the fertilizer 5 building for custom blending. 40 to 60 tons 6 of AN was stored in wooden bins inside the 7 building at the time of the incident. 8 In examining the classification of 9 AN, U.S. regulations do not classify AN as an 10 explosive until it has been blended with a 11 fuel source for the purpose of making an 12 explosive mixture. Therefore fertilizer grade 13 AN is not classified as an explosive, which 14 can affect the actions from firefighters 15 during response operations for fires involving 16 ammonium nitrate. 17 The next portion of our 18 presentation will examine the issues related 19 to the issues of emergency planning and 20 response. And my colleague Dr. Samuel Oyewole 21 will lead this section of the meeting. 22 DR. OYEWOLE: Thank you very much

Page 27 202-234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. 1 Mr. Banks. The toll in the wake of the West 2 Fertilizer explosion was huge and included 3 five firefighters from the West Volunteer Fire 4 Department, two firefighters from the Abbott 5 Volunteer Fire Department, one firefighter 6 from Navarro Mills Volunteer Fire Department, 7 one duty Captain from the Dallas Fire 8 Department, one EMT from the West Volunteer 9 Fire Department and four members of the 10 public, including two good Samaritans who 11 supported the emergency response at the 12 fertilizer plant. 13 While ammonium nitrate itself does 14 not burn, the conditions under which ammonium 15 nitrate may detonate when subjected to a fire 16 exposure, are not clearly understood. And 17 current guidance does not guarantee 18 firefighters safety. 19 The deaths of the volunteer 20 firefighters and emergency responders at West, 21 Texas on the night of April 17, 2013, was not 22 the first time that firefighters would be

Page 28 202-234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. 1 killed when responding to ammonium nitrate 2 related explosion incidents. On April 16, 3 1947, a ship containing 2,300 tons of wax 4 coated ammonium nitrate exploded in the port 5 of Texas City, killing 581 people, including 6 all the 26 Texas City firefighters that 7 responded to the incident. 8 Similarly, on November 29, 1988, 9 six firefighters from the Kansas City, 10 Missouri Fire Department, were killed in an 11 explosion involving a trailer/magazine 12 containing blasting mixtures of ammonium 13 nitrate and fuel oil as well as aluminum 14 pellets. 15 The firefighters at West, Texas 16 were aware of the magnitude of the hazard of 17 anhydrous ammonium from the tanks. A 18 poisonous cloud which could leak out of the 19 facility and drift into nearby homes. They 20 were not aware of the risk and magnitude of an 21 ammonium nitrate explosion hazard. 22 One method for improving awareness

Page 29 202-234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. 1 of risk and hazard is to perform preincident 2 planning. However, there are no Federal 3 requirements for preincident planning at 4 ammonium nitrate facilities. Effective site 5 specific preincident planning is needed to 6 guide the fire fighters on any initial and 7 subsequent actions while on ground at a scene 8 of a fire. 9 The National Fire Protection 10 Association, NFPA, a nonprofit standards 11 organization, has been developing standards 12 directly affecting the fire service at the 13 department level since 1896. The NFPA 14 produces more than 300 consensus codes and 15 standards intended to minimize the possibility 16 and effects of fire and other risks. 17 The codes are voluntary standards 18 that each State has to adopt in order to be 19 enforced. Standards are attempts by an 20 industry or profession to self regulate by 21 establishing minimal operating performance or 22 safety criteria. These are supposed to be

Page 30 202-234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. 1 recommended practices for fire fighting 2 departments. 3 One of such standards is the NFPA 4 1620 standard for preincident planning. The 5 2010 addition states that the preincident plan 6 should be the foundation for decision making 7 during an emergency situation, and provides 8 important data that will assist the incident 9 commander in developing appropriate strategies 10 and tactics for managing the incident. 11 Additionally, NFPA 471, 12 recommended practice for responding to 13 hazardous materials incidents. The 2002 14 addition provides guidance on how to develop 15 and effective incident response planning 16 strategy. 17 Fire fighting environments are 18 inherently unpredictable, volatile and fought 19 with risk. It is therefore important for 20 decisions to be made in a context of changing 21 priorities, on certain information and limited 22 resources. The National Fire Protection

Page 31 202-234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. 1 Association, NFPA 472 standard for 2 professional competence for responders to 3 hazardous incidents, 2013 addition, provides 4 guidance on the competencies for awareness 5 level for personnel and competencies for 6 incident commanders. 7 Situational awareness and site 8 insight is very essential in emergency 9 situation. Especially in hazmat incidents. 10 This should include a thorough overall 11 assessment of the scene and identification of 12 all possible hazards to insure safety of the 13 emergency response crew. 14 Most fire fighting trucks and 15 vehicles are equipped with the current edition 16 of the Emergency Response Guidebook, jointly 17 produced by the U.S. Department of 18 Transportation, Transport Canada, and the 19 Secretariate of Communications and 20 Transportation in Mexico. The ERG also known 21 as the Emergency Response Guidebook is 22 intended for first responders to consult

Page 32 202-234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. 1 during the initial phase of a dangerous goods 2 or hazardous material transportation incident. 3 The ERG gives directions on how to 4 respond to fires in transportation situations, 5 but did not give any direction in terms of 6 handling and storage of hazardous materials 7 like ammonium nitrate fertilizer. If a 8 warehouse containing ammonium nitrate is 9 treated as an enclosed space, such as stands 10 or trailers or carloads, in a fire situation, 11 some of the guidance provided by the ERG could 12 help firefighters make prompt and informed 13 decisions such as not fighting a fire 14 involving ammonium nitrate. 15 There are 15 variations of 16 ammonium nitrate listed in the current edition 17 of the ERG. Next to each AN variant is the 18 guide number that leads to information on the 19 potential hazard and the appropriate emergency 20 response. These measures however are very 21 vague and subjective to individual users. 22 The CSB compared the fire fighting

Page 33 202-234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. 1 measures in the MSDS provided by CF 2 Industries, the manufacturer of the ammonium 3 nitrate used at West Fertilizer. The MSDS 4 provided by a similar large ammonium 5 manufacturer, as well as the current edition 6 of the DOT Emergency Response Guidebook. 7 MSDS is the Material Safety Data 8 Sheets. It's a document containing all the 9 pertinent information on a product. It is 10 provided by the manufacturer of a product. 11 These examples of guidance for fighting fires 12 involving ammonium nitrates illustrates the 13 hazards are not clearly communicated to 14 emergency responders. 15 All three highlighted guidance 16 indicate that the behavior of ammonium nitrate 17 under the conditions highlighted, are not 18 clearly understood. Also, terms such as 19 massive, major, large, protected location and 20 distance are not clearly defined in all three 21 guidelines. 22 While the West Fertilizer MSDS

Page 34 202-234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. 1 provided by CF Industries and the ERG suggests 2 flooding a fire involving ammonium nitrate 3 from a distance, the large manufacturer's MSDS 4 suggests fighting such fires from a protected 5 location. In both cases, the same distance of 6 protected location are not clearly defined. 7 Hence a firefighter is left to 8 make a subjective judgment in determining 9 which location or area is protected. Which 10 distance is safe enough to fight a fire 11 involving ammonium nitrate, or which fire is 12 massive or major. 13 Firefighters perform tasks that 14 may often put their lives on the line. In 15 order to prevent deadly implications, it is 16 important for firefighters to receive adequate 17 training on how to effectively make timely 18 decisions in fire situations. 19 Firefighter training varies across 20 the country. Many volunteer fire departments 21 have training programs equal to that of career 22 fire departments. For example, in Texas, the

Page 35 202-234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. 1 general requirements for volunteer fire 2 protection personnel certification programs, 3 are the same as those for career firefighters. 4 Certification for career 5 firefighters is mandatary, but for volunteer 6 firefighters, participation in this 7 certification is strictly voluntary and not 8 strictly enforced. 9 The National Fire Protection 10 Association, the NFPA estimated that there 11 were approximately over one million 12 firefighters in the United States as of the 13 end of 2012. Including 345,950 career 14 firefighters, which accounts for 31 percent of 15 the firefighter population. And 783,300 16 volunteer firefighters, which account for 69 17 percent of the firefighter population. 18 Approximately 95 percent of all 19 volunteer firefighters are in local fire 20 departments that protect fewer than 25,000 21 people. Interestingly, more than half of 22 these volunteer firefighters are located in

Page 36 202-234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. 1 small, rural departments that protect fewer 2 than 2,500 residents, similar to West, Texas. 3 There an estimated 30,100 fire 4 departments in the United States. Of these, 5 2,610 departments are all career, mostly 6 including 1,995 career departments. 5,445 are 7 mostly volunteer. Out of which 20,050 8 departments are all volunteer. 9 The CSB found that despite all 10 this, there are no Federal requirements for 11 volunteer fire departments, which account for 12 almost 85 percent of all the fire departments 13 in the United States to develop site specific 14 preincident plans with businesses and chemical 15 plants dealing with hazardous materials like 16 ammonium nitrate. 17 At this time, I will now turn over 18 this presentation to my colleague, Ms. Rachel 19 Gunaratnam to discuss the CSB's preliminary 20 findings on emergency response planning. 21 MS. GUNARATNAM: Thank you Samuel. 22 The CSB has found that emergency planning is

Page 37 202-234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. 1 extremely important when responding to a 2 chemical accident. It can help reduce the 3 number of injuries and fatalities when 4 communities can effectively respond during an 5 emergency. 6 On the day of the incident, as 7 emergency responders were trying to tackle the 8 fire at West Fertilizer, many residents were 9 unaware that just a few 100 feet away was a 10 material that would detonate. Residents were 11 injured during the explosion as they were 12 watching the fire next to their windows, in 13 their homes, from their cars and on the 14 street. 15 This was because there was no 16 official evacuation order or an alert issued 17 during emergency response to let residents 18 know to evacuate or find a safe area within 19 their home. But such an order or an alert 20 would need to be preplanned. Because as 21 stated previously, there's only about 20 22 minutes between the time of the 911 call and

Page 38 202-234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. 1 the explosion. 2 Local officials would need to know 3 ahead of time to make this decision quickly. 4 But there was no preplanning that occurred 5 prior to April 17th, even though there are 6 regulations that exist to help prepare 7 communities. 8 Two key Federal regulations that 9 address emergency planning applied at West 10 Fertilizer. The first is the Emergency 11 Planning and Community Right to Know Act, 12 otherwise known as EPCRA that Congress enacted 13 in 1986. This law is intended to help 14 communities prepare for a chemical accident. 15 EPCRA encourages emergency 16 planning efforts on the State and local level. 17 And even though EPCRA is regulated under the 18 U.S. Environmental Protection Agency, the EPA, 19 it is enforced by the State of Texas. West 20 Fertilizer was covered under this law, which 21 I will go into more detail later. 22 The second is the risk -- then

Page 39 202-234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. 1 there's the Risk Management Program intended 2 to compliment EPCRA by requiring companies to 3 prevent a chemical accident. It was first 4 implemented in 1999, and this regulation 5 covers a list of chemicals that are primarily 6 toxic or flammable. 7 Under RMP, companies have to 8 develop a program to prevent a chemical 9 accident from occurring and then they must 10 share that program with local authorities. 11 West Fertilizer was required to do an RMP, but 12 only for their storage of anhydrous ammonia, 13 which is a toxic chemical. Ammonium nitrate 14 is not covered under this program. 15 This program which is also 16 regulated by the EPA is enforced at the 17 Federal level and not by the State of Texas. 18 Together, both of these programs encourage the 19 sharing of information between companies and 20 their surrounding communities for emergency 21 planning. 22 However, during our investigation,

Page 40 202-234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. 1 the CSB found there were serious problems with 2 emergency planning prior to April 17th, 3 especially with implementing EPCRA, which I 4 will discuss in my next slide. 5 EPCRA is a law that provides a 6 framework for all -- sorry. EPCRA is a law 7 that provides a framework for all States to 8 follow. That framework involves four parts. 9 Emergency planning, emergency release 10 notification, hazardous chemical storage 11 reporting, and toxic chemical release 12 inventory. 13 Our focus will be on emergency 14 planning, which is what mattered at West. As 15 stated previously, this law is enforced by the 16 State and not by the Federal EPA, and is 17 administered by the Texas Division of 18 Emergency Management under the Department of 19 Public Safety. 20 Under EPCRA, a company must report 21 their chemicals that fall under two 22 categories. First they must report their

Page 41 202-234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. 1 chemical if it is on EPA's list of Extremely 2 Hazardous Substances, EHS at certain 3 quantities. This list consists of extremely 4 toxic chemicals that would cause severe harm 5 to a community if exposed at acute levels. 6 West Fertilizer did have an EHS 7 substances, anhydrous ammonia, which they 8 reported over the years. Ammonia nitrate is 9 not on this list because it does not meet the 10 criteria of an EHS. 11 However, a company must also 12 report a hazardous chemical as defined by OSHA 13 in quantities of 10,000 pounds or more. These 14 are chemicals with physical or health hazards. 15 Ammonium nitrate fits this criteria, and West 16 Fertilizer did report their ammonium nitrate 17 in 2012. 18 After a company identified what 19 chemicals they must report, they must report 20 this to their local fire department, LEPC and 21 the State. And LEPC stands for a Local 22 Emergency Planning Committee. This Committee

Page 42 202-234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. 1 is charged with developing an emergency 2 response plan for their district. 3 The City of West falls under 4 McLennan County, and is part of the McLennan 5 County LEPC. West Fertilizer reported in 2012 6 their quantities of anhydrous ammonia and 7 ammonium nitrate to the West Fire Department, 8 the McLennan County LEPC and the State of 9 Texas. 10 Once a company has reported this 11 information under EPCRA, the LEPC uses that 12 information to develop a comprehensive 13 emergency response plan. This emergency 14 response plan is key to preparing communities 15 for a chemical accident. 16 A plan should include procedures, 17 evacuation plans and training programs for 18 emergency responders. And include schedules 19 to exercise that plan. 20 McLennan County did develop a 21 Comprehensive Emergency Response Plan, which 22 is required by Texas to be reviewed every five

Page 43 202-234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. 1 years. However McLennan County didn't include 2 West Fertilizer in their plan Because the 3 State of Texas believed they were exempted 4 under EPCRA. 5 The exemption that was applied 6 here is the Agricultural Use Exemption, which 7 excludes substances used in routine 8 agricultural operations or is a fertilizer 9 held for sale by a retailer to the ultimate 10 customer. Based on the language of the 11 exemption, McLennan County and the State of 12 Texas thought the exemption applied to West 13 Fertilizer. 14 So even though West Fertilizer had 15 an extremely hazardous substance and an OSHA 16 hazardous chemical, they were thought to be 17 exempt under EPCRA, therefore exempt from the 18 emergency planning requirements. 19 Federal EPA however would not 20 apply this exemption to companies like West 21 Fertilizer who blended ammonium nitrate. EPA 22 does provide some minimal guidance on their

Page 44 202-234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. 1 website, which states that the chemicals at 2 West Fertilizer are the starting materials 3 used to make a fertilizer and not the 4 fertilizer itself. And they say retailers 5 should report the amounts held for blending to 6 produce the new fertilizer. 7 This disconnect between the 8 Federal and State agencies played a 9 significant role in the lack of emergency 10 planning at West Fertilizer, which left 11 emergency responders and residents unprepared 12 for what occurred on April 17th. 13 I will now turn it over to Johnnie 14 Banks who will introduce our panelists to 15 discuss emergency planning and response. 16 MR. BANKS: Thank you. Before we 17 introduce the panel, the Chair will Entertain 18 questions from the other Board members. 19 CHAIRPERSON MOURE-ERASO: I would 20 like to ask Board members if they have any 21 particular questions for the investigative 22 team.

Page 45 202-234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. 1 MEMBER GRIFFON: I think I'll 2 reserve them now. Most of my questions were 3 more directed to the panelists, so. When we 4 ask the panelists if they can -- and yes. 5 CHAIRPERSON MOURE-ERASO: Board 6 Member Rosenberg? 7 MEMBER ROSENBERG: I think I'll 8 wait. 9 CHAIRPERSON MOURE-ERASO: I have 10 one question for -- in the slide number 37, it 11 was reported by Rachel that West Fertilizer 12 reported ammonium nitrate amounts to OSHA 13 under the hazardous chemicals. 14 Could you elaborate a little on 15 that. Like what did OSHA do after that report 16 in 2012 as far as you know? 17 MS. GUNARATNAM: Is this on? Okay. 18 When I was referring to that, the company, 19 West Fertilizer did report on their Tier 20 Two's. It's an inventory report. And they 21 submitted that only, as far as we know, we're 22 still looking into how far back, but we only

Page 46 202-234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. 1 know that they reported in 2012 their 2 quantities of ammonium nitrate on their Tier 3 Two report. 4 CHAIRPERSON MOURE-ERASO: Okay, 5 thank you. Another thing is, it says that you 6 put it out under Federal EPA, there is not the 7 retail exemption on the use of fertilizer. So 8 did EPA know that there was ammonium nitrate 9 being used in the facility? And if they did, 10 what kind of actions happened? 11 MS. GUNARATNAM: Federal EPA? 12 CHAIRPERSON MOURE-ERASO: Yes. 13 MS. GUNARATNAM: No, I don't 14 believe they knew, because they're not 15 required to report at the Federal level, 16 they're only -- you know West Fertilizer was 17 only required to report at the State level, 18 so. 19 CHAIRPERSON MOURE-ERASO: I see, 20 okay. Thank you. Johnnie. 21 MR. BANKS: Thank you. At this 22 time I would like to introduce our panelists

Page 47 202-234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. 1 for the discussion on the Emergency Response 2 and Planning. The panel for this group would 3 be Chris Barron, if you'd come up. Elizabeth 4 Harman, Mr. Frank Patterson and Glenn Corbett. 5 CHAIRPERSON MOURE-ERASO: Johnnie 6 could you -- 7 MR. BANKS: I would -- I'll do a 8 brief introduction. Mr. Barron is currently 9 -- currently serves as the Executive Director 10 of the State Fireman and Fire Marshall's 11 Association of Texas, and has been with the 12 organization for over eight years. 13 Next is Ms. Elizabeth Harman. Ms. 14 Harman is representing the International 15 Association of Firefighters or IAFF. She has 16 been the Assistant to the General President 17 for Grants Administration of Hazmat, Weapons 18 of Mass Destruction Training at IAFF since 19 February, 25, 2013. 20 Also here today is Mr. Frank 21 Patterson. Mr. Patterson has more than 25 22 years of experience it the emergency response

Page 48 202-234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. 1 and homeland security fields. And has served 2 as Emergency Management Coordinator for the 3 City of Waco and McLennan County since 1999. 4 Lastly, I'd like to introduce Mr. 5 Glen P. Corbett. Mr. Corbett is an Associate 6 Professor of Fire Science at John J. College 7 of Criminal Justice, the City University of 8 New York. He is the former Chair of the 9 Department of Protection Management. 10 He serves as technical editor of 11 Fire Engineering, a 128 year old fire service 12 journal. He is a former Assistant Chief in 13 the Waldwick, New Jersey Fire Department, and 14 has served as the President of the New Jersey 15 Society of Fire Service Instructors. 16 Thank you all so much for joining 17 us this evening. We would ask that if you 18 like to present a brief statement, and then 19 we'll entertain questions from the Board. 20 We'll start with Mr. Barron. 21 MR. BARRON: Good evening and 22 welcome to Texas. On behalf of the 23,000

Page 49 202-234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. 1 individual firefighters and members of our 2 association, we want to extend our condolences 3 to the City of West. They were all members of 4 our organization, and certainly participated 5 in our certification program. 6 In Texas 78 percent of the fire 7 services manned by volunteer fire departments 8 across the State, over about 1,900 fire 9 departments across Texas and which about 1,600 10 of which are volunteer fire departments. 11 Training standards vary across the State, 12 because as you know in Texas, it's a vast 13 State. 14 There might be a fire department 15 in West, Texas that might run one structure 16 fire a year. And mostly run wild land fires. 17 Or there might be another fire department in 18 the Houston area that might run nothing but 19 structure fires, but never run a wild land 20 fire call. 21 So the standards and the 22 requirements are generally left up to the

Page 50 202-234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. 1 local jurisdiction to have an authority to set 2 minimum certification standards for those fire 3 departments. 4 We see a lot of fire departments 5 that are still quite underfunded. That do not 6 have the tools, the equipment or the training 7 necessary to fight these type of fires. And 8 they do the best job that they can with what 9 they have and the resources they have. 10 Certainly West was one of those 11 fire departments that instituted a 12 certification and a training program. They 13 trained their firefighters. Several of which 14 were close to certification, if not already 15 having a certification based on National Fire 16 Protection Association standards, firefighter 17 one and firefighter two, which is what our 18 certification program is based on. 19 I can tell you that fire 20 departments all across Texas continue to 21 improve their certification, their equipment, 22 and their personnel based on the needs of the

Page 51 202-234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. 1 community and the growing demands on those 2 fire departments, whether it's EMS calls, 3 hazmat calls, or general fire suppression 4 response. 5 We are learning a lot from this 6 incident in West. And certainly with the State 7 Fire Marshall's report, there will be a lot of 8 lessons learned that fire departments can take 9 back to their communities and implement those 10 lessons learned so that tragic events like 11 this won't happen again. 12 MR. BANKS: Thank you. Ms. Harman. 13 MS. HARMAN: Thank you. Good 14 evening. Is it on? Is that on? 15 Thank you very much for the 16 opportunity to present and chat with all of 17 you this evening. On behalf of our General 18 President, Harold Shaitberger, our condolences 19 go out to all the families and the community 20 here in West, Texas on this tragic event. 21 The International Association of 22 Firefighters represents more than 300,000

Page 52 202-234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. 1 firefighters across the United States as well 2 as Canada. Those firefighters protect more 3 than 85 percent of the nations populations. 4 The incident here in West, Texas 5 for us really emphasizes the importance for 6 training for first responders. Particularly 7 at the hazardous materials operations level. 8 Firefighter one, firefighter two are very 9 important. Hazardous materials operations, as 10 indicated in OSHA as well as NFPA 472 is a 11 minimum level that all firefighters should 12 have. 13 With that training, it's not just 14 the skills that they take with them to bring 15 there, it's the skill of the thinking, the 16 analyzing process. Preplanning, is part of 17 that. Preplanning for these facilities within 18 the local area, we've discussed today and 19 we've heard that there are no Federal 20 regulations for that. 21 That is part of being a hazmat 22 operations person. It is part of being a fire

Page 53 202-234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. 1 department. Understanding what is in your, as 2 we say, our first do area. What is in your 3 community? How much is in there? How is it 4 going to mix and mingle with the other things 5 that are in there? That's key. That's all 6 part of being a firefighter. 7 Recognizing the potentials for 8 that. And recognizing the potentials of those 9 incidents and merging those with the 10 capabilities of that individual department. 11 Many department as we've heard are strapped 12 for -- in budgets these days. The first thing 13 that goes when budgets are tight, are 14 training. 15 Training should never go in a fire 16 department. It can be conducted formally. It 17 can be conducted informally. The 18 International Association of Firefighters for 19 the past 25 years has provided hazardous 20 materials operations training to both career 21 and volunteer firefighters, training more than 22 5,000 first responders every year in hazardous

Page 54 202-234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. 1 materials operations training. It's key. 2 Not only do we train recruits, but 3 at time we find that we're training incumbent 4 firefighters. Folks who have been on the job 5 for 10, 15, 20 years and have never had that 6 level of training before. And it's a real eye 7 opener for them. 8 The importance also with regards 9 to that training, is recognizing and 10 identifying the materials that are in the 11 facilities, whether it's a tanker, a rail car 12 here. This was actual fertilizer facility 13 here. What's in there? 14 A training beyond the awareness 15 level is key. That operations level is going 16 to take you there. How to use that Emergency 17 Response Guidebook. That's key. That's the 18 bible to some firefighters. It should be in 19 the pocket coat of every firefighter that's 20 out there. 21 Whether you're again on the 22 railway or you know your first do area.

Page 55 202-234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. 1 You've got to be able to look up what that 2 chemical is. 3 And worst case scenario, if you 4 don't have that book, or you look it up and it 5 surpasses the capability that your department 6 has, you move immediately into a defensive 7 operations, and not put yourself, your fellow 8 firefighters or your community at risk. But 9 you move back to watching it and frankly 10 letting it burn if that's how it has to be. 11 We support through out training a 12 risk based approach. We call it APIE, 13 analyze, plan, implement and evaluate. We 14 embed that in every firefighter that we train. 15 So that they know whether or not they can go 16 in, they shouldn't go in, or they stand back 17 and move to a defensive operations. 18 We stand by to assist in any way 19 that we can with this community. With the 20 rest of the nation as well as Canada, where 21 our members are. With training programs, with 22 qualified, very experienced instructors that

Page 56 202-234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. 1 come in from all over the globe to deliver 2 these training programs. We'll be more than 3 happy to share those programs, the expertise 4 and the subject matter expertise of all the 5 instructors that we have. 6 And again, thank you for the time 7 to share that, and our resources that we hope 8 to share with all of you here. 9 MR. BANKS: Thank you very much. 10 Mr. Patterson. 11 MR. PATTERSON: Thank you. My name 12 is Frank Patterson. I'm the Emergency 13 Management Coordinator for the City of Waco, 14 McLennan County, Texas. And on the agenda I 15 believe it said I was the LEPC. I'm a member 16 of the LEPC and as you all know the LEPC is an 17 industry driven committee. 18 And we are as the Emergency 19 Management Office, we are the repository for 20 the LEPC related to Tier Twos within our 21 county. And we also are involved in the 22 Emergency Management Plan. I don't know how

Page 57 202-234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. 1 deep you want to get into. 2 I have -- I mean if you want to 3 wait and ask questions, but I did feel like we 4 maybe needed to discuss the way the State of 5 Texas does our planning so you can understand 6 that part of it. If you want to wait or you 7 want do that now, I can do it now. Okay, all 8 right. 9 In the State of Texas back in 10 1975, we've already had an all hazard plan 11 approach for the State of Texas, in which 12 there was requirements for jurisdictions to 13 plan as an all hazard approach. And when the 14 EPCRA rules came out in 1986, that -- those 15 standards in the EPCRA community rights law 16 were distributed amongst various annexes 17 within our plans. 18 Our plans are 22 annexes and a 19 basic plan. And they're functional in a 20 nature. The annexes are functional in nature. 21 So it's warning, firefighting, law 22 enforcement, things of that nature.

Page 58 202-234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. 1 And so through that process, they 2 were broken up into the plan throughout the 3 plan. So it's not a stand alone. We have a 4 hazard material annex, but all the warning 5 doesn't matter if it's a hazmat incident or a 6 tornado or whatever it is, the warning point 7 is still the same warning point. So it's 8 those things were distributed throughout the 9 plan. 10 And that's the same thing we do 11 here. In the State of Texas we have three 12 levels of planning. Basic, intermediate and 13 advanced. In McLennan County we've been at 14 advanced preparedness levels for years. Ever 15 since I've been here, we've maintained an 16 advanced preparedness level in regards to 17 that. 18 So in specific tier two reporting, 19 the tier two reports as you all know that go 20 to the State, and they also go to the fire 21 department, which has a primary responsibility 22 for the area, and they come to the LEPC.

Page 59 202-234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. 1 So our office, the Office of 2 Emergency Management, acts as a repository for 3 the LEPC and those tier twos as it relates to 4 that. I think for the other thing to 5 recognize, is that there are some things, and 6 I'm glad you all are here. I think there's 7 going to be great things that come out of this 8 and really goes above and beyond standards. 9 I think there's some protocols 10 that can come from this as well that will 11 really help through the process. I believe 12 that the EPCRA standard needs to be changed. 13 I believe there's things in there through the 14 reporting process and the way we get it from 15 the Federal to the State to the locals, has 16 deficiencies in there that need to be 17 addressed. 18 I know that, because I've believed 19 this since 1999 since I've been here, you 20 know, there really is no -- there is no 21 tangible, I guess punitive actions for 22 industries that don't report. There's some

Page 60 202-234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. 1 civil things that are written in there that 2 says LEPC can do some civil actions. But what 3 business is going to go after another 4 business? That's kind of like the fox 5 watching the hen house. 6 So there's some things within that 7 I think we need to address, we need to look 8 at. I also think that through the process of 9 planning process, there's a disconnect in 10 getting that information all the way down to 11 the basic core level. 12 You know we send it in, it goes to 13 the State. It gets put in a file and says 14 okay, this community has a right to know, if 15 somebody want so call, we'll ask them about it 16 -- we'll tell them about it if they want to 17 know about it. 18 But as far as the local level, if 19 industry comes in and builds somewhere and 20 there's no requirements for that industry to 21 tell them, or if it's a small mom and pop 22 industry, and they don't know the rules, they

Page 61 202-234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. 1 don't know to apply to begin with, the local 2 government doesn't know if they've built in an 3 incorporated area on Texas. If there's not 4 way of permitting a requirement for them to 5 get a permit to build, that they're even there 6 until years later until after they're there. 7 I mean you know, so there's things 8 that need to be addressed on the front end I 9 think help. There's things that we do as an 10 industry, as a dispatch fire industry that 11 need to be implemented on the back end of this 12 as well. 13 And that is you know, like in 14 dispatch for example, this should be a 15 requirement, that all dispatchers have that 16 information in their CAD system so when they 17 dispatch fire departments to a fire, that 18 dispatcher then brings it up, it jumps up with 19 an icon and say hey, there's something here. 20 We need to notify the firemen that are 21 responding, there's something here. 22 And that's what I'm talking about.

Page 62 202-234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. 1 That there's things throughout this system 2 that there's holes through this that we can 3 work on. And I'm glad this is occurring that 4 you all are here, you all are looking at this 5 and we're going through this, because I think 6 we're going to see positive outcomes from it. 7 And it starts all the way through, Federal, 8 State and local. 9 So thank you all very much for 10 your time. And I appreciate being here. 11 MR. BANKS: Thank you very much. 12 Mr. Corbett. 13 MR. CORBETT: Thanks. Thank you 14 Mr. Banks. Chairman Moure-Eraso, Board 15 Members Rosenberg, Griffon, thank you for 16 allowing me to testify tonight regarding the 17 April, 2013 explosion at the West, Texas 18 fertilizer company. 19 I'd also like to extend my 20 condolences to the family and friends of those 21 who were killed and injured as well as 22 everyone else has here tonight.

Page 63 202-234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. 1 I'll confine my remarks to the 2 issue of firefighting response to the West 3 Fertilizer facility, and the context of the 4 firefighting recommendations of Appendix E of 5 the Nationally recognized code NFPA 400, the 6 hazardous materials code. And the Chemical 7 Advisory, Safe Storage Handling and Management 8 of Ammonium Nitrate, a joint publication by 9 the ATF, OSHA and EPA. 10 While I will not focus on the code 11 provisions dealing with storage and handling 12 of ammonium nitrate tonight, I must note that 13 the ammonium nitrate provisions found in our 14 Nationally developed model codes are grossly 15 deficient, antiquated, contradictory and 16 confusing. The recommended firefighting 17 procedures found in NFPA 400 and the Advisory 18 are just one element of an entire set of code 19 provision that need to be rewritten. 20 We heard tonight about the 21 firefighting efforts that took place at West. 22 It's obvious that the West, Texas fire

Page 64 202-234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. 1 department attempted to engage the fire and 2 attempted to extinguish the fire, contain the 3 fire. We know that they were there for about 4 20 minutes and apparently they may have been 5 on their way realizing that the fire was in 6 fact uncontrollable, may have made the 7 decision to leave and to evacuate. 8 When we look at NFPA 400, it 9 appears that the firefighting efforts at the 10 West facility were entirely consistent with 11 the following specific recommendations from 12 NFPA 400, and I quote, should a fire break out 13 in an area where ammonium nitrate is stored, 14 or in a vehicle transporting ammonium nitrate, 15 it is important that the mass be kept cool and 16 burning might be promptly extinguished. 17 Large volumes of water should be 18 applied as quickly as possible. If fires 19 reach massive and uncontrollable proportions, 20 firefighting personnel should evacuate the 21 area and withdraw to a safe location. 22 And again we hear those vague

Page 65 202-234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. 1 indescribable terms, uncontrollable and 2 massive, whatever that means. This set of 3 provisions in 400 encourages firefighters in 4 fact to attack an ammonium nitrate storage 5 fire. It is likely that the fire department 6 supplied perhaps several hundred gallons 7 emitted on the fire. 8 We don't know a lot about what 9 exactly happened that night. But they in fact 10 of course did try to extinguish -- contain and 11 extinguish the fire. 12 The provisions that encourage 13 firefighters to keep attacking the fire until 14 it reaches again those undefined massive and 15 controllable proportions, and only then 16 evacuate the area are really problematic. It 17 appears that the West firefighters again did 18 exactly what these recommendations said to do. 19 And another seemingly 20 contradictory statement, I quote, where 21 possible firefighters should withdraw and 22 allow the structure or vehicle to burn if it

Page 66 202-234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. 1 can be done safely. I don't know what that 2 means. Let me say it again. Where possible, 3 firefighters should withdraw and allow the 4 structure or vehicle to burn if it can be done 5 safely. 6 It appears that a firefighter 7 should only abandon firefighting efforts if 8 the burning structures with the ammonium 9 nitrate storage will not pose a threat to the 10 surrounding communities. That's the only 11 conclusion I can draw from that. 12 Given the fact that the fire was 13 venting, obviously as we saw in the video, in 14 the photographs earlier, there's another 15 provision which I'd like to mention briefly 16 here, that 400 discusses in terms of the 17 confinement of the byproducts, or the products 18 of combustion. 19 And again I quote, as much 20 ventilation as possible should be provided to 21 the fire area. Rapid dissipation of both the 22 products of decomposition and heated reaction

Page 67 202-234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. 1 is very important. Now if you look at the 2 Advisory that the ATF, EPA and OSHA created in 3 the wake of the West incident, you'll see that 4 they sort of split hairs with that specific 5 issue about ventilation. So again, it's 6 another problem. 7 So in essence NFPA 400 provides 8 inappropriate recommendations in my opinion, 9 encouraging firefighters to engage a fire 10 unless it is massive and uncontrollable. The 11 problem with this recommendation is that it's 12 entirely too late for firefighters to withdraw 13 when the fire's in fact massive and 14 uncontrollable, placing them in grave danger 15 as well as the people in the surrounding 16 community without time to evacuate. 17 As I mentioned, OSHA, ATF and EPA 18 issued in August, 2013, their Chemical 19 Advisory dealing specifically with ammonium 20 nitrate. While it's a slight improvement over 21 NFPA 400, the Advisory fails to provide 22 definitive advice as to how and when to fight

Page 68 202-234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. 1 a fire. To some extent it relies on the same 2 language from NFPA 400. 3 For example, the Advisory suggests 4 that firefighters and I quote, should first 5 consider if they can safely fight the fire, or 6 whether they should just let it burn. Move to 7 a safe location and focus on evacuating nearby 8 residents and preventing further safety issues 9 for the surrounding community. 10 The Advisory -- this Advisory 11 places the emphasis on a set of observed 12 conditions of anyone of the following. Number 13 one - a fire involving ammonium nitrate is 14 judged to be quote, out of control. Number 15 two - a fire is engulfing the ammonium 16 nitrate. Again, whatever that exactly means. 17 Brown or orange smoke is detected, which would 18 indicate the presence of nitrogen dioxide, or 19 number four - rapid increase in the intensity 20 or amount of smoke or fire in the area of 21 ammonium nitrate. 22 So that's both 400 and the

Page 69 202-234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. 1 Chemical Advisory recommend firefighting of -- 2 recommend fighting a fire involving ammonium 3 nitrate storage. Neither set of 4 recommendations make a distinction about the 5 amount of ammonium nitre, or the type of 6 construction the fire protection features in 7 the building. Whether it's well protected 8 with non-combustible construction, up to date 9 handling equipment and sprinklers versus a 10 wood frame structure, without any fixed fire 11 safety features as was seen in West. 12 It is my opinion that it is a 13 mistake for the code and the Advisory to 14 recommend a fire attack in an ammonium nitrate 15 warehouse such as the one found in West. It 16 is the initial wrong course of action. 17 I believe that responding 18 firefighters should concentrate their efforts 19 purely on evacuation such as was done in 20 Bryan, Texas in 2009. While firefighters is 21 sworn to protect property, the potential for 22 disaster is very high with ammonium nitrate.

Page 70 202-234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. 1 Lives are at risk including those 2 of the firefighters. Time is not on the side 3 of the responding firefighters, it is best to 4 simply move everyone back and let the fire 5 burn itself out. 6 So with that, I'll end my 7 comments, and I would entertain questions if 8 you have any. Thank you very much. 9 MR. BURNS: Thank you. 10 CHAIRPERSON MOURE-ERASO: Yes, some 11 questions from the Board. 12 MEMBER GRIFFON: Yes, I can start 13 with a few questions. For the local Emergency 14 Planning Commission. I was curious, you 15 mentioned that the LEPC was an industry driven 16 group. And I wondered if you could just 17 expand a little bit on how the LEPC in 18 McLennan County, how is it funded? Or how 19 does it sustain it's work that you do on the 20 LEPC? 21 MR. PATTERSON: Well it's not 22 funded. It's an unfunded mandate. And so

Page 71 202-234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. 1 what happens is, is our Office of Emergency 2 Management, we do our best to engage and keep 3 that going. That is a part of our 4 partnership, that's what we do. 5 But it is an unfunded mandate. 6 Industry, there is no -- although there might 7 be a requirement that industry participate, 8 that doesn't always mean that they're going to 9 because there's nothing on the back end of it 10 if they don't. 11 So that's kind of what I was 12 mentioned getting to earlier. But there 13 currently is an unfunded mandate. We receive 14 no funding for it. We don't have any funding. 15 And so we are actually in years past, in 2004 16 we applied for a grant through the hazardous 17 material, through the Texas Division of 18 Emergency Management, to do a commodity flow 19 study of what's coming through our county, up 20 and down our highways and interstate. 21 So that's essentially when we want 22 to do any kind of large project, either

Page 72 202-234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. 1 industry -- the local industry has to fund it, 2 or we go out for grants. I will tell you, we 3 have a very robust hazardous material team by 4 the City of Waco, which is a paid fire 5 department. 6 In 2000, looking at the facilities 7 within our county, I quickly realized that we 8 didn't have all the tools we needed to respond 9 to some of these facilities. So working with 10 industry, we actually developed that hazmat 11 team. The industry provided resources to the 12 city to develop that. 13 Since that, it's become a regional 14 team. And what I mean regional, it's global 15 to the county as other six counties, if it's 16 requested they'll respond. And we've been 17 able to fund that through grants as well, 18 where we've gotten grants through Homeland 19 Security grant funding to buy them equipment, 20 send them to school, keep them educated. Keep 21 all that going. So that's really it. 22 MEMBER GRIFFON: Okay, and that's

Page 73 202-234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. 1 exactly why I brought up the question, was the 2 question of the unfunded mandate. And in my 3 experience is that some the LEPCs around the 4 country that have been most effective and 5 active, they have one large industry in that 6 community that ends up putting forward a lot 7 of resources and you know, chairing the 8 committee et cetera. 9 MR. PATTERSON: That's correct. 10 MEMBER GRIFFON: And so, but I 11 appreciate the answer. Did -- in this 12 situation, did you receive an RMP from West 13 for the West Fertilizer facility, a Risk 14 Management Plan? 15 MR. PATTERSON: Not that I recall, 16 no. 17 MEMBER GRIFFON: No, okay. Okay. 18 And did you -- do you receive those from other 19 companies, the RMPs themselves, or? 20 MR. PATTERSON: I have received in 21 the past from places. 22 MEMBER GRIFFON: You have received

Page 74 202-234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. 1 from some of them, okay. 2 MR. PATTERSON: Yes, from some in 3 the past, yes. 4 MEMBER GRIFFON: I mean is it a 5 regular thing, or is it a -- 6 MR. PATTERSON: No, it's just -- 7 it's not. 8 MEMBER GRIFFON: Okay, sort of 9 sporadic? 10 MR. PATTERSON: correct. 11 MEMBER GRIFFON: All right. 12 Because that's something I think we want to 13 see how they fit together. All right. 14 And this might be more general, I 15 don't know if more generally to the rest of 16 the panel. The question came up specifically 17 on the training levels, hazmat operations 18 level, and I wondered if there's any 19 requirements for the fire departments to have 20 a certain number of individuals trained at 21 certain levels, level one, level two, or 22 operations level?

Page 75 202-234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. 1 MR. BARRON: I could answer that. 2 No, not in the volunteer world. I'm not sure 3 in the paid world if there is, but there are 4 certain requirements regarding firefighter one 5 and firefighter two that is regulated for the 6 paid firefighters of Texas. 7 MS. HARMAN: And I can address that 8 with regards to national certification 9 standards. From the National Pro Board, which 10 is an affiliate of the NFPA, there are 11 certification standards for firefighter one 12 and firefighter two, prerequisite for that is 13 hazmat operations. 14 So you will find that most career 15 professional firefighters are at a minimum 16 hazmat operations. So that should be 17 everyone. If you -- I mean across the 18 country, across Canada, if you call 911 now, 19 and a firefighter walks in this door with 20 turnout gear, you should expect that at a 21 minimum, they have hazmat operations level 22 training.

Page 76 202-234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. 1 Are they a technician? Do they 2 understand chemistry? Are they a specialist? 3 No. That is a definitely a specialized group 4 that's usually taken on by a very large 5 department or it's done regionally, things of 6 that nature, because that gets much more into 7 a lot more education, equipment, specialized 8 apparatus, things of that nature. 9 MR. CORBETT: Just briefly, I'll 10 mention the volunteers as well. It's really 11 in a State by State basis, so certain States 12 do require that volunteers also have fire one, 13 fire two, which includes -- the fire two 14 includes the operations level training and 15 things. But again it's a State by State 16 basis, as whether it's paid and volunteer, or 17 just volunteer, just paid that kind of thing 18 across the country. 19 MEMBER GRIFFON: And do you know 20 for Texas? 21 MR. CORBETT: I haven't lived here 22 in 20 years, so I don't remember. I think

Page 77 202-234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. 1 MR. BARRON: It is included in 2 firefighting two. 3 MEMBER GRIFFON: It is included, 4 okay. All right. And then along this idea of 5 preincident planning that was pointed out in 6 their presentation. I think -- let's see, we 7 basically said that there's no -- point out 8 that there's no Federal requirement for fire 9 departments to conduct preincident planning at 10 ammonium nitrate storage facility. 11 And I think we had another similar 12 finding related to volunteer fire departments. 13 And I wonder if -- I just wanted to ask what 14 your thoughts are on whether, if there were a 15 Federal requirement for that, do you think 16 that the -- a volunteer fire department would 17 have the expertise to be able to do that sort 18 of preincident planning, or would they need 19 other resources, you know experts, chemistry, 20 you know, other experts to help them in 21 determining actually how to do -- you know, to 22 put together the plan?

Page 78 202-234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. 1 MR. BARRON: Coming from the 2 volunteer fire department that I grew up in, 3 we did preincident planning. And that 4 generally involved a tour of the facility. It 5 involved drawings. It involved tier two 6 reports, which are generally brought to our 7 attention. 8 That goes in a binder that goes on 9 the main apparatus, the main engines of a fire 10 department. So at least in my world we did. 11 I can't say that every fire department in 12 Texas does that. But I don't know if there 13 would be a need for experts to come in for a 14 simple preplan that would include exits, that 15 would include type of construction, that would 16 include tier two and include hazardous 17 materials identification within a particular 18 plant or storage facility. 19 MEMBER GRIFFON: Okay. Others have 20 opinions on that? 21 MR. CORBETT: Again, being an North 22 easterner, I'll just say that you know, I live

Page 79 202-234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. 1 in a county that's got 69 fire departments. 2 Five of them are career, the rest are all 3 volunteer. And each community is different. 4 And I can tell you just from my 5 own experience, that you know, industry sort 6 of within the community are usually well known 7 to the firefighters there. And I think they 8 do -- a lot of departments will take that 9 extra step as he mentioned earlier, about 10 going out visiting the facility, meeting with 11 people, sort of trying to get an understanding 12 of what's going on. 13 But certainly I mean, again these 14 are folks that have regular jobs during the 15 day and practice at night and they're filling 16 out infers reports and all sorts of other 17 things, paperwork that they have to do in 18 today's world. And you know, being able to 19 bring in experts you know, that's done again 20 at the local level I think. 21 Once they -- if they understand 22 that this is a problem, that they will ask

Page 80 202-234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. 1 certainly for help. At least that's been my 2 experience. Thank you. 3 MEMBER GRIFFON: Right, okay. 4 Thanks, I'll let others. 5 MEMBER ROSENBERG: I just have one. 6 Hi, I just wanted to ask Mr. Corbett. If the 7 language you read about AN, the confusing and 8 ambiguous language that you read, is that 9 typical of other chemical standards? Or just 10 -- is it just AN? 11 MR. CORBETT: Well, I mean there 12 are other -- 13 MEMBER ROSENBERG: How nervous 14 should we be? 15 MR. CORBETT: Well, what's unique 16 about ammonium nitrate is that -- and again, 17 I did some work for the Board on this as sort 18 of code work, research and things. I mean a 19 lot of it comes from the 1950s, basically 20 after Texas City. And there was a heightened 21 alert, you know a level of alert for folks. 22 And I think, the fact is we needed

Page 81 202-234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. 1 up with specific recommendations for the 2 specific chemical which you know, in other 3 realms, it's usually grouped by category. If 4 it's radioactive or flammable liquid and 5 things. 6 But this is unique in my mind in 7 the sense that there's not a lot of them out 8 there that had their own set of specific 9 recommendations. Even though I think they're 10 erroneous and probably incorrect. But that's 11 been around for again, almost 50 years now, 12 so. 13 But I don't know that there are. 14 I mean, again there's a variety of different 15 kind of training materials out there at 16 different levels. I mean a lot of us you 17 know, when we go through training and things, 18 or provide training, we try to at least get 19 the firefighters to understand you know, the 20 different categories in hazmat and generally 21 how they react. You know, what the problems 22 are, what the issues are and things.

Page 82 202-234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. 1 But when it comes to something 2 like this and everything. Again in my mind, 3 it's somewhat unique in the sense that it has 4 it's own sort of special set of 5 recommendations. 6 MEMBER ROSENBERG: Okay, thank you. 7 CHAIRPERSON MOURE-ERASO: Thank 8 you. I have a question also for Mr. Corbett. 9 You hear our investigative team describing the 10 two incidents. One in 2009 in El Dorado, 11 Texas and the other in West Fertilizer. 12 And I wonder, first of all I would 13 like to ask you, what are your opinions, or 14 why the actions of the initial responders that 15 were the way that they were describing here 16 pretty similar, why in one case there was 17 basically no consequences, and the other case 18 was really catastrophic consequences. 19 And I would like after you give me 20 your opinion on this, I would like to ask the 21 same question to the CSB Panel, they would 22 like to elaborate a little answering that

Page 83 202-234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. 1 specific question. Why it didn't explode in 2 El Dorado and why it did explode in West, 3 Texas? But let's start with Mr. Corbett. 4 MR. CORBETT: Yes, I think one of 5 the issues here about ammonium nitrate you 6 know, is that for one of the larger code 7 issues that I mentioned earlier again, more 8 about the storage and handling, was that it's 9 sort of a bipolar situation. On one hand we 10 sort of think of it as this innocuous 11 fertilizer. And on the other hand we think of 12 it as an explosive. And the code reflects 13 that sort of ambiguity between them. 14 Now as far as the specific 15 incidents go, one of the things that at least 16 in my mind, when I was doing the research, was 17 the fac that we don't have a lot of research 18 specifically on ammonium nitrate in its 19 habitat, meaning in its storage facility, in 20 its handling and things like that. We've got 21 a lot of bench scale research that looks at 22 the chemical itself.

Page 84 202-234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. 1 But there's nothing to look at it 2 from the perspective of large full scale 3 testing of a storage facility, right. And you 4 know bringing in organic materials, bringing 5 in fuels, all those kinds of things. We don't 6 have that, that I could find, any of that 7 research that's been conducted. 8 And you know, I think a lot of 9 this is luck unfortunately. I mean you know, 10 we don't know, I mean again I found 11 contradictory information about ventilation of 12 the fire, right. That you know, we know what 13 happened in Texas City, that the ship was 14 sealed and the explosion occurred. 400 15 recommends that we ventilate the fire. 16 But in some cases, that's not what 17 we're recommending here and stuff. And I 18 think part of that goes back to the fact that 19 we don't know. I mean we don't know exactly 20 how these materials, exactly how they 21 detonate. 22 I mean we know that they can

Page 85 202-234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. 1 detonate, but the mechanics of the storage, 2 the organic, the fuels, all those kind of 3 conditions together, I don't know that we 4 thoroughly understand that. And I think going 5 forward that's something that you know, some 6 entity really should be looking at and try ti 7 figure out, is it shock, does that really mean 8 anything? Is it ventilation? Is it the size 9 of the fire? Is it the ammonium nitrate 10 buried under a cake of molten ammonium 11 nitrate? 12 I mean these are all things in my 13 mind that I don't know because I'm not a 14 chemist to begin with. But I don't know the 15 answers to that and I think we've got to do 16 the research. 17 I don't know if that answers your 18 question. I'm trying to. 19 CHAIRPERSON MOURE-ERASO: Yes, it 20 is. It point out too difficult. I wonder if 21 our investigator in charge, Johnnie Banks 22 would like to add more on this comparison of

Page 86 202-234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. 1 El Dorado and West, Texas. 2 MR. BANKS: Well, it really you 3 know, resonated with us, the striking 4 difference in outcomes between the West 5 incident and the Bryan incident. 6 There was, we think, early on in 7 the response to that fire in Bryan, the 8 discovery of it -- of material safety data 9 sheet that indicated that there was ammonium 10 nitrate. And that the firefighters should 11 respond with copious amounts of water. 12 They didn't have that water, and 13 so they pulled back. They allowed the 14 facility to burn to the ground. They also 15 effected an evacuation of the surrounding 16 community. I think up to 10,000 people were 17 evacuated. 18 And those were the things that 19 stand out. As Mr. Corbett indicated, there is 20 a randomness to -- or a seeming randomness to 21 the way ammonium nitrate behaves. I mean 22 we've looked at a number of different

Page 87 202-234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. 1 incidents where there's been a fire involving 2 ammonium nitrate and in some instances, 3 virtually the same circumstances with 4 completely different outcomes where in one 5 instance it will explode and anther it 6 doesn't. 7 There's the -- as Mr. Corbett 8 said, there's the shock value, there's the 9 contamination, there's the decontamination. 10 So there's any number of different factors 11 that we see that come to the forefront when 12 you're looking at an ammonium nitrate 13 incident. 14 The West and Bryan incidents were 15 -- they really you know, struck a nerve with 16 us, because the 24 minutes that it took to 17 respond, that would have been outside of that 18 window at West. So there was, as I said this 19 morning, there was a lot of really snap 20 decisions that people were making decisions 21 based on the best information that they had. 22 And in 20 minutes they went from

Page 88 202-234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. 1 where ever they were in West, and responded, 2 they answered the call. They brought four 3 units to the site and they began doing you 4 know, what they were tasked with doing. 5 Heroically. 6 The -- I think the wisdom that we 7 hope to bring out of this is that if there's 8 a knowledge before hand that the AN, ammonium 9 nitrate is involved, as Mr. Patterson said, 10 that that information should be in the 11 firefighters hand when they leave the station. 12 They should have that information 13 either through some device in their rigs, or 14 some hard copy that says that there's ammonium 15 nitrate, or there's some other toxic or really 16 nasty material in this building. And the 17 prudent thing to do is just to step back and 18 you know, really assess it. And get the right 19 people involved to make the decisions on what 20 to do next. 21 It's property that we're talking 22 about. And the loss of life is one that I

Page 89 202-234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. 1 think is untenable. 2 CHAIRPERSON MOURE-ERASO: Thank 3 you. I would like to come back to Mr. 4 Corbett. You proposed like two different 5 approaches on AN. You said that the 6 guidelines, especially the very last guideline 7 that was produced by OSHA, EPA and ATF, that 8 they are vague in terms of talking about 9 actions to be taken when something is 10 uncontrollable or massive. 11 So my question is, can you 12 conceive a way to quantify the type of 13 situation? Or that -- when something is 14 uncontrollable, when something is massive, 15 that's first. And you're alternative -- your 16 other alternative that you proposed was to say 17 well, rather than deal with the specifics of 18 those situations, you feel that an evacuation 19 should be like the first action to be 20 considered. 21 And you know, so I don't know if 22 you want to comment about uncontrollable and

Page 90 202-234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. 1 massive, and if we always should evacuate. 2 And I would like also to ask the same 3 questions to the firefighters that are 4 involved on this, or how do they feel about 5 uncontrollable, massive, or just evacuate and 6 withdraw from fighting the fire. 7 So Mr. Corbett? 8 MR. CORBETT: Yes, I -- again 9 that's an undefined term that gives me a lot 10 of angst to try to wrap my hands around. From 11 my estimation, I don't know that perhaps that 12 massive -- the problem -- my problem is this. 13 Is that if it's massive and you're getting to 14 a point where it's massive, uncontrollable, 15 you're probably behind the eight ball already 16 right off the bat. 17 And given the fact that most of 18 these facilities are in remote areas, rural 19 areas in the country and things, time is not 20 on our side here. And I don't know that 21 there's anything quantify able that we can 22 about it.

Page 91 202-234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. 1 I think what we can say though is 2 that you know, if for example, you know, it's 3 a more modern facility, the building's 4 sprinklered, it has non-combustible 5 construction for the building and the bins and 6 you know perhaps even the bags that are used 7 are fire resistant, then I think those are all 8 things that would led me to believe that okay, 9 maybe this is something we can deal with. 10 I mean one of the things we should 11 be looking at in my opinion is video 12 surveillance. I mean cameras are cheap today. 13 We can afford them. That's not a very 14 expensive alternative. And I think having 15 surveillance equipment you know, in these 16 storage facilities, available remotely off 17 site, as we mentioned earlier, having a 18 preplan, wold allow firefighters even before 19 they even get there to look at what's going on 20 inside the building. 21 If they see that it's a wastepaper 22 basket or it's a forklift on fire, then it's

Page 92 202-234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. 1 a whole different animal. It's not the issue 2 that we're dealing with. But if they see that 3 there's a bin on fire and a lot of ammonium 4 nitrate, I think that's a warning sign to us 5 you know. 6 I would think that if the building 7 was sprinklered though that the sprinkler 8 system would have knocked the fire down, no 9 question about that. 10 So but I didn't answer your 11 question because I don't know the answer. I 12 don't know that I can put a number to 13 uncontrollable and massive. I think if you're 14 at that point, you're way too far down the 15 trail here. And time again is not on our 16 side. 17 I mean we should -- again, you 18 know, this is a fertilizer plant. It's 19 something that -- there's no, you know if 20 there's no life hazard, you know workers and 21 things like that, then the firefighter should 22 simply pull back and evaluate the neighborhood

Page 93 202-234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. 1 based upon their plans that they've developed 2 ahead of time you know, as far as set back 3 distances for the evac. 4 Again, I don't know that I -- I 5 didn't answer that question. I don't know 6 what the purpose, I'm sorry. 7 CHAIRPERSON MOURE-ERASO: No, no. 8 But it's very instructive what you say. I 9 would like to ask Ms. Harman and Mr. Barron 10 for the point of view of the people that have 11 to fight the fires. How do you feel about 12 evacuating or dealing with -- making a 13 decision that something is controllable, or 14 that something is not massive? 15 MS. HARMAN: Right. And you hear 16 that a lot from fire officers and folks who 17 have a lot of experience with that. And the 18 definition of looking at something and saying 19 that's uncontrollable, that's massive. That 20 comes with training. That comes with years of 21 experience. 22 That's the gut feeling that a

Page 94 202-234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. 1 firefighter has when they're there. Because 2 they've done their preplanning, they know 3 what's in that facility. They know the 4 quantities of what's in that facility, and the 5 inter-reactions of those. And that does come 6 with experience. 7 So how you quantify that, I don't 8 think you're going to see a firefighter 9 standing there trying to do a mathematical 10 equation. And I don't know if we could come 11 up with that or if it would even be prudent. 12 But it does come down to training and 13 experience and truly preplanning. 14 You know as far as being defensive 15 operations, you know we look at different 16 situations as high risk, low probabilities, is 17 it a high probability, a low risk. And 18 there's a weighted balance at times here. 19 You know this particular incident 20 here in West, Texas for us, is really a 21 reminder that these types of tragic events can 22 happen in both rural areas and large urban

Page 95 202-234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. 1 areas. There's been a focus over the years 2 that this is a large urban area issue, or that 3 hey, they've got a tank farm over here. 4 This was a smaller, unexpected, 5 high risk, maybe low probability that maybe we 6 got too comfortable too quick as a nation, as 7 a community. We look across, where does the 8 Federal funding go right now. It goes to high 9 risk areas. It goes to areas that have large 10 commodity flows, things of that nature. 11 So I think you know, defensive 12 operations is going to depend on what is that 13 risk? Is it a high risk, low probability? 14 Can you evacuate quicker than you can put the 15 -- then you can extinguish the blaze? What 16 are your staffing numbers? How many people do 17 you physically have? Are you going to exhaust 18 them before you know, you can get control of 19 the incident? 20 And what are the resources you 21 have with regards to equipment? And water? 22 And water supply? All of those are taken into

Page 96 202-234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. 1 account and eventually, that incident 2 commander who should have years of experience 3 in the proper levels of training, is going to 4 make a judgement call on that. 5 CHAIRPERSON MOURE-ERASO: Thank you 6 Ms. Harman. Mr. Barron? 7 MR. BARRON: I'm going to echo what 8 she said. In addition to making those high 9 risk, those type of decisions on a scene, 10 they're going to have to also equate into the 11 fact that do they have the proper equipment to 12 put out these type of fires? Do they have the 13 water supply? Is the water supply for a 14 community available enough to fight a 15 structure fire, or fight a massive chemical 16 fire like this? Do they have enough foam? 17 So it's going to depend on a lot 18 on what type of equipment and training and 19 specialized apparatus that they might have. 20 Now along channel industry, along the Texas 21 coast where they have six thousand gallon per 22 minute trucks and foam that could go all day

Page 97 202-234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. 1 long, it's a different story. 2 But in other areas of the State 3 they just don't have that type of equipment. 4 It's very expensive. It's very expensive to 5 maintain and it takes specialized training. 6 So it's all going to depend on the 7 location, the training, your risk assessment 8 of course. And then what type of water 9 supply, or extinguishing agent that you're 10 going to have. 11 CHAIRPERSON MOURE-ERASO: Thank 12 you. Thank you very much. I would like very 13 much to thank the panel. I think it has been 14 very useful for us to hear this. I don't know 15 if there is anything else that you want to do 16 Johnnie before dismissing the panel after we 17 thank them. 18 MR. BANKS: I just want to echo 19 your sentiments and thank the panel. It's 20 been very informative, very helpful. I hope 21 that the community appreciates the time that 22 you've taken to come here and contribute to

Page 98 202-234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. 1 this effort. 2 It's been very, very helpful for 3 all of us, so I appreciate it. Thank you. 4 CHAIRPERSON MOURE-ERASO: Thank you 5 Johnnie. So we're going to take a -- well, 6 yes. 7 (Applause) 8 MEMBER GRIFFON: Mr. Chairman I'd 9 like to add one thing. 10 CHAIRPERSON MOURE-ERASO: Yes, 11 please. I'm sorry, if anybody would like to 12 have the last statement, please. 13 MEMBER GRIFFON: Sorry about 14 that. We think that Texas is a leader in the 15 United States when it comes to learning from 16 our lessons from tragic events. And we have 17 done so on line of duty this through State 18 Fire Marshall's Office. Mandatory legislation 19 that investigates all line of duty deaths in 20 Texas. 21 Within a matter of nine months, 22 the State of Texas developed an industrial

Page 99 202-234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. 1 response for municipal firefighters class 2 that's 32 hours long for volunteer 3 firefighters, municipal firefighters, to 4 respond to these type of events, and have the 5 training necessary. It's a 32 hour class, 6 it's being implemented all across Texas, and 7 there is grant funding available out there for 8 that. 9 So we've stepped up above what, 10 instead of just sitting back and we're 11 throwing out training to these firefighters 12 that's even more particular to these type of 13 events. So I just wanted to express that, and 14 that we are learning from our lessons from 15 these tragic events. And we're doing 16 something about it. 17 CHAIRPERSON MOURE-ERASO: Thank you 18 very much. Any other statements for the 19 panel? 20 MR. CORBETT: Yes, just thank you, 21 I just think we've -- again we've got a lot of 22 work to do as far as the National

Page 100 202-234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. 1 recommendations, when we have National bodies 2 telling us that we should be doing something, 3 which I -- and again, I made my case here that 4 I think is wrong. I think we need to change 5 that. 6 But thank you again for allowing 7 us to testify, all of us. 8 CHAIRPERSON MOURE-ERASO: Thank 9 you. Thank you very much. Yes? 10 MR. PATTERSON: I have one last 11 thing. I would encourage from a local 12 perspective, you know, this is the local guy. 13 When we establish the National standards that 14 we have alternatives. I've heard sprinkler 15 systems mentioned several times. I've read 16 the reports about sprinkler systems. 17 What we need to keep in mind in 18 rural America, and Texas is no different, that 19 you have water wells that supply those rural 20 water supplies. They don't have enough water 21 to supply a sprinkler system. 22 So as we come up with these

Page 101 202-234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. 1 regulations, you could essentially -- and I'm 2 looking beyond just ammonium nitrate. I mean 3 this is what we're talking about, but what I'm 4 hoping is that this will be -- it will 5 transcend ammonium nitrate. I'm hoping we're 6 looking at more than just ammonium nitrate 7 here. I hope this is not just a one trick 8 pony. 9 So as we go through this, what I 10 hope is that we come up with alternative 11 standards. Whether it be if you don't have a 12 sprinkler system, you've got to build it out 13 of you know, concrete so thick, whatever it is 14 you know. Whatever that non-flammable 15 material would be. 16 But that we don't get so focused 17 on everything that we lose sight of the local 18 guy and the small guy in this process as well. 19 There's a balance here. And I think that I 20 just hope that as we go forward with these 21 standards, that they're realistic. 22 Even for the first responders and

Page 102 202-234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. 1 the firefighters, that they're realistic 2 standards that we're going to look at 3 developing for the volunteer as we go forward. 4 So I appreciate your time. 5 I know in McLennan County, the 6 State you know, has a standard that doesn't 7 allow some counties to adopt fire codes 8 because they're of a certain size. Well 9 McLennan County was one of those. But we're 10 adjacent to a county that's large enough, so 11 we can then adopt codes. 12 We're looking at that right now. 13 We're looking at establishing fire codes for 14 the unincorporated areas of the country. 15 We're looking at establishing the Office of 16 Fire Marshall. But even with that, there's 17 counties in this State of Texas that can't 18 adopt fire codes because they're just not 19 allowed to under State law. 20 So -- which goes back to that 21 whole as we develop these standards you know, 22 I just encourage you all to keep that in mind.

Page 103 202-234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. 1 And I appreciate the opportunity. Thank you. 2 CHAIRPERSON MOURE-ERASO: Yes. I 3 cannot help but after you mentioned the fire 4 codes, to ask a question. Another thing, why 5 do you think there is this regulation in Texas 6 that the small towns are not allowed to have 7 fire codes? 8 MR. PATTERSON: Well I can only 9 speak to counties. I can't speak to cities 10 you know particular. If I can speak to 11 counties, Because that's where I'm at is the 12 country level. 13 And I really can't answer that 14 question. I don't know why that is. The fire 15 Marshall will be up here in a little while in 16 the next panel. The State Fire Marshall, he'd 17 probably be the question, the one to ask that 18 question. 19 CHAIRPERSON MOURE-ERASO: Okay, 20 well I'll ask him that question. 21 MR. PATTERSON: Thank you. 22 CHAIRPERSON MOURE-ERASO: Do you

Page 104 202-234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. 1 have any additional comments? 2 MEMBER ROSENBERG: I do not. Thank 3 you very much for the opportunity to be here. 4 CHAIRPERSON MOURE-ERASO: All 5 right. Thank you very much. So thanks again 6 to the panel. 7 (Applause) 8 CHAIRPERSON MOURE-ERASO: We are 9 going to take a ten minutes intermission to 10 continue the program. So we -- so for ten 11 minutes. 12 (Whereupon, the foregoing matter 13 went off the record at 7:23 p.m. 14 and went back on the record at 15 7:35 p.m.) 16 CHAIRPERSON MOURE-ERASO: Thank you 17 very much. We are ready to reconvene. I'm 18 going to ask Johnnie Banks, the investigator 19 in charge for the West investigation, to 20 continue with the presentations, as planned. 21 So, Mr. Banks. 22 MR. BANKS: Thank you. For the next

Page 105 202-234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. 1 portion of our presentation we're going to be 2 taking a look at Land Use Planning, and Mr. 3 Jerad Denton is going to lead that portion of 4 the proceedings. So, Mr. Denton. 5 MR. DENTON: Thank you, Mr. Banks. 6 Welcome back, everyone. 7 In the second half of the 8 presentation the investigative team will 9 discuss issues surrounding Land Use Planning. 10 There's a particular interest in Land Use 11 Planning because of all of the CSB's 12 investigations to date, some of the most 13 severe offsite consequences the CSB has 14 encountered have been in the West 15 investigation. The fact that the fertilizer 16 facility was located near a middle school, a 17 large apartment complex, a nursing home, and 18 a high school is extremely concerning. Action 19 must be taken to insure similar facilities are 20 kept at a safe distance from the community. 21 This presentation seeks to explain 22 how the City of West came to be located so

Page 106 202-234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. 1 close to the fertilizer facility. It seeks to 2 explore some of the offsite consequences from 3 the West incident, and it seeks to discuss the 4 scope of this problem. We'll conclude with a 5 discussion from our panel and the public to 6 determine if there might ways to utilize Land 7 Use Planning to prevent similar accidents. 8 Now, in the case of West the city 9 experienced severe offsite consequences. The 10 explosion at the fertilizer facility resulted 11 in at least 14 fatalities and over 200 12 injuries. The explosion also caused damage and 13 destruction to over 350 homes, an apartment 14 complex, three schools, a nursing home, and a 15 hospital. With housing limited as a result of 16 this explosion, many families were forced to 17 live in nearby Waco or Hillsboro. West City 18 Park which contained a playground area was 19 also destroyed by the blast. 20 Now, what follows is a blast model 21 produced after months of collecting and 22 analyzing data on the effects of the blast.

Page 107 202-234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. 1 The CSB hired ABS Consulting to develop the 2 model. Through this model we began to see how 3 the pressure wave moved through the community 4 and the magnitude of the pressure each 5 structure experienced. Note the short amount 6 of time that passes as the wave propagates 7 through the community. As you can see, many of 8 the structures experienced pressure around 1 9 psi, which is like having 144 pounds of load 10 on a 12-inch by 12-inch floor tile. This load, 11 combined with the rate that the blast wave 12 moved at produced a substantial amount of 13 damage. 14 Now, we get to see some of this 15 damage through the next slides. Here's some of 16 the photos of the West Intermediate School 17 taken by the CSB in days following the 18 explosion. On the left there was substantial 19 damage to the gymnasium. Note the deformation 20 in the roof joists. On the right are photos 21 from where there was fire damage in the 22 school. The roof and ceiling caved in on the

Page 108 202-234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. 1 northwest side. This damage is especially 2 concerning when we consider that the school 3 was not in session. Had it been, many more 4 could have been injured due to the extensive 5 damage. 6 The apartment complex located 7 about 450 feet from the center of the blast 8 was decimated. The building was heavily 9 damaged by the explosion with failure 10 experienced to both the walls and the roof. 11 Two fatalities occurred at the apartment 12 complex. 13 Now, to understand a little bit 14 about how the facility came to be located so 15 close to the City of West it's helpful to take 16 a historical look at the city and the 17 facility. The fertilizer facility was built in 18 1961 and opened for business in 1962. The 19 facility was used as a storage and retail 20 distribution hub that sold mixed fertilizers, 21 chemicals and farming supplies to the public. 22 The facility played an important role in West,

Page 109 202-234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. 1 which is a farming community. It provided 2 farmers with the necessities to grow crops and 3 save them from having to make a trip to Waco 4 or Hillsboro. 5 At the time, the facilities were 6 largely surrounded by open fields leaving 7 concern for any potential offsite 8 consequences. Furthermore, no zoning 9 regulations existed at the time the facility 10 began business. The community's largest 11 concern with the facility was the occasional 12 accidental release of anhydrous ammonia. 13 However, over the years the City of West began 14 to slowly build residences, schools, and other 15 occupied buildings within close proximity to 16 the facility. 17 Now, through assistance from the 18 McLennan County Engineer's Office, the CSB was 19 able to visually show the community's 20 development over the years. We start with a 21 photo of West in the 1950s. And from this 22 photo you get the sense that the site of the

Page 110 202-234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. 1 fertilizer facility was largely an open field. 2 Now, in the '60s the facility itself was 3 established. And in the '70s the community 4 starts developing north of downtown. In the 5 '80s more growth is located around the 6 facility itself with a track, a baseball park, 7 West City Park, and a lot more infrastructure 8 located north of the facility itself. 9 In 2010, substantial 10 infrastructure is located near the facility. 11 And, ultimately, parks, subdivisions, nursing 12 homes, schools, and an apartment complex came 13 to be located within a 600-foot radius of the 14 facility itself. 15 Now, here's a photo of the 16 facility just prior to the explosion. Notice 17 how many more buildings and schools surrounded 18 the facility, and how close they are to the 19 facility. You get a sense from the photo that 20 as the community continued to locate its 21 infrastructure near the facility it became an 22 even more attractive area to develop.

Page 111 202-234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. 1 Here's a photo that depicts the 2 destruction of West using before and after 3 photographs. I'll point out to keep an eye on 4 some of the areas closest to the facility, 5 West Park, the apartment complex, and some of 6 the residences up here. And from this photo 7 you really get a sense of the devastation that 8 the community experienced. 9 Now, importantly, the location of 10 ammonium nitrate facilities in or near 11 populated areas exists all over the country. 12 It's not just a problem in the City of West. 13 In fact, according to data reported to the 14 Department of Homeland Security under the 15 Chemical Facility Anti-Terrorism Standards 16 there are 1,350 facilities across the country 17 that store ammonium nitrate in quantities 18 greater than 2,000 pounds. Some of these 19 facilities are located near commercial and 20 residential areas. 21 The CSB has developed a map to 22 give you a sense of where fertilizer

Page 112 202-234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. 1 facilities like the one in West, Texas are 2 located. Note that this map is concerned with 3 fertilizer grade ammonium nitrate storage and 4 not the storage of explosive grade ammonium 5 nitrate. 6 You can see that the majority of 7 these types of facilities that have reported 8 information to the Department of Homeland 9 Security are located in the southeast. This 10 map shows that the problem is larger than the 11 West, Texas incident. 12 Now, to further our discussion of 13 Land Use Planning, we need to start with an 14 understanding of the Land Use Planning legal 15 framework. U.S. law largely assigns the 16 authority to regulate how private land is used 17 to the individual states. In turn, the states 18 generally assign this authority to their 19 individual municipalities or counties. Zoning 20 codes are, therefore, typically adopted as 21 ordinances at the county or local level. 22 However, at all levels of government there's

Page 113 202-234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. 1 been a failure to adopt codes concerning the 2 siting of many types of hazardous facilities 3 near communities, and this includes fertilizer 4 grade ammonium nitrate facilities like the one 5 in West, Texas. 6 Another issue in Land Use Planning 7 is grandfathering, which is to say that Land 8 Use Planning and Zoning codes typically do not 9 apply to existing ammonium nitrate storage 10 facilities. So, for instance, the West 11 fertilizer facility existed prior to the 12 promulgation of the city's Code of Ordinances 13 which creates an issue of grandfathering, 14 meaning that the city ordinances did not apply 15 to the West fertilizer facility. 16 Now, this is a serious concern 17 given that many of the ammonium nitrate 18 facilities have been in existence since the 19 1960s and the 1970s. So, even if zoning 20 regulations were adopted in a municipality 21 today, ammonium nitrate facilities already in 22 existence would not be subject to such

Page 114 202-234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. 1 regulation. Facilities that are covered, 2 however, are facilities that are constructed 3 after zoning codes have been enacted, or 4 existing facilities which undergo significant 5 modifications after code enactment. 6 Yet another issue in the Land Use 7 Planning discussion is that Texas does not 8 require the adoption of the fire code which 9 has been pointed out here today. This is 10 important because a fire code could provide 11 for important safety measures to protect the 12 community. These measures can include 13 requiring setback distances for hazardous 14 facilities. They can require non-combustible 15 materials be used in a facility's 16 construction, and they can require the 17 installation of sprinkler systems. However, 18 many rural counties in Texas cannot adopt a 19 fire code. Only counties that have populations 20 over 250,000 or counties that are adjacent to 21 a county with a population over 250,000 are 22 allowed to adopt a fire code. Therefore, the

Page 115 202-234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. 1 majority of the counties in Texas cannot adopt 2 a fire code to prevent accidents such as the 3 West incident. 4 Furthermore, in 2003, the CSB in 5 its Third Coast Industries investigation made 6 a recommendation to the County of Brazoria, 7 Texas to adopt a fire code. The county 8 proactively adopted such a code, and while the 9 County of Brazoria, Texas is to be commended 10 for taking such action, this serves to 11 highlight the fact that the CSB has identified 12 the lack of fire codes in Texas counties as an 13 issue as far back as 2003. 14 McLennan County, where the West 15 fertilizer facility was located, had not 16 adopted a fire code, although it technically 17 had the authority to do so because of its 18 proximity to the more populous Bell County. 19 The West fertilizer facility was, thus, not 20 required to follow any NFPA or ICC 21 recommendations for the storage of ammonium 22 nitrate.

Page 116 202-234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. 1 Now, at this time I will turn the 2 presentation over to Mr. Johnnie Banks to 3 invite our panelists to come forward and 4 participate in the discussion on Land Use 5 Planning. Thank you. 6 MR. BANKS: Thank you, Mr. Denton. 7 Okay. I am pleased to introduce our second 8 panel. First we have Mr. Bruce Johnson. As I 9 call your name, if you would just come over 10 and take a seat at the desk there. 11 Mr. Johnson currently serves as 12 the Director of Fire Service Activities for 13 the International Code Council. Before joining 14 the Code Council staff in September 2007, he 15 held a position of fire marshal for Riverhead 16 Town, Long Island, New York from 1998 until 17 2007. 18 Next we have Mr. Mark Roberts. Mr. 19 Roberts is the International Code Council 20 Senior Regional Manager of State and Local 21 Government Relations serving Arkansas, 22 Louisiana, Oklahoma, and Texas.

Page 117 202-234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. 1 Also we have Mr. James Schwab. Mr. 2 Schwab joined the American Planning 3 Association as an Assistant Editor of Planning 4 Magazine in November of 1985. After serving in 5 several other positions, he is currently the 6 Manager of APA's Hazards Planning Research 7 Center. 8 Lastly, we have Mr. Chris 9 Connealy. Mr. Connealy is the Texas State Fire 10 Marshal and Deputy Insurance Commissioner with 11 the Texas Department of Insurance, or TDI, 12 since June of 2012. 13 Thank you all for participating in 14 the discussion on Land Use Planning, and if 15 you would like to have a brief opening 16 statement, we'll start with Mr. Johnson. 17 MR. JOHNSON: Thank you, Mr. Banks. 18 Good evening, Chairman Moure-Eraso, CSB Board 19 Members, staff, panelists, and members of the 20 community. My name is Bruce Johnson, and I'm 21 the Director of Fire Service Activities in the 22 Government Relations Department at the

Page 118 202-234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. 1 International Code Council. 2 On behalf of ICC, our Board 3 President and CEO we extend our condolences to 4 the family, their members, and the community 5 for the loss that was suffered a year ago here 6 in West, Texas. 7 The ICC is a membership 8 association dedicated to building safety, fire 9 prevention, energy conservation and 10 sustainability. The ICC develops model 11 building codes used to construct residential 12 and commercial buildings, and a model fire 13 code to insure buildings remain safe 14 throughout their useful life. 15 The ICC also develops a model 16 zoning code, the IZC, that is adopted at the 17 local level in 11 states, including 24 18 jurisdictions here in Texas. Most U.S. cities, 19 counties, and states that adopt codes choose 20 the International Codes or I Codes developed 21 by the ICC. The I Code are currently adopted 22 at the state or local level in all 50 states,

Page 119 202-234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. 1 the District of Columbia, Guam, Puerto Rico, 2 the U.S. Virgin Islands, and the Northern 3 Mariana Islands. It is the mission of the ICC 4 to provide the highest quality codes, 5 standards, products and services for all 6 concerned with the safety and performance of 7 the built environment. The best most effective 8 method for states to insure that their built 9 environment remains safe, sustainable, 10 affordable, and resilient is through adopting 11 up-to-date model construction and fire safety 12 codes. 13 The I Codes undergo an update 14 every three years through an open and 15 consensus-based code development process that 16 considers the latest technology, fire research 17 data, installation techniques, new building 18 products and methods, and affordability. For 19 a jurisdiction to benefit from these advances 20 in the code, routine adoption update is 21 necessary. 22 The International Fire Code, or

Page 120 202-234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. 1 IFC, is a model code that establishes the 2 minimum fire safety levels for both new and 3 existing buildings. It is the intent of the 4 IFC to establish the minimum requirements 5 consistent with nationally recognized good 6 practice for providing a reasonable level of 7 life safety and property protection from the 8 hazards of fire, explosion, or dangerous 9 conditions in both new and existing buildings, 10 structures, and premises, and to provide 11 safety to fire fighters and emergency 12 responders during emergency operations. 13 The purpose of the International 14 Zoning Code is to safeguard the health, 15 property, and public welfare by controlling 16 the design, location, use or occupancy of all 17 buildings and structures through the regulated 18 and orderly development of land and land uses 19 within a jurisdiction. 20 The IFC contains a chapter 21 entitled "Construction Requirements for 22 Existing Buildings," or Chapter 11. The intent

Page 121 202-234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. 1 of this chapter is to provide a minimum degree 2 of fire and life safety to persons occupying 3 existing buildings by providing minimum 4 construction requirements where such existing 5 buildings do not currently comply with the 6 minimum requirements of the International 7 Building Code. 8 The scoping section of Chapter 11 9 goes to say, "The fire code official is 10 authorized to grant necessary extensions of 11 time when it can be shown that the specified 12 time periods for compliance with these 13 retroactive requirements are not physically 14 practical, or pose an undue hardship. The 15 granting of an extension of time for 16 compliance shall be based on the showing of 17 good cause and subject to the filing of 18 acceptable systematic plan of correction with 19 the fire code official." 20 This chapter of the IFC captures 21 retroactive requirements that were 22 incorporated in earlier editions of the IFC,

Page 122 202-234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. 1 particularly in Chapters 7, 9, and 10. These 2 requirements were previously found in 3 different chapter sections of the code, and 4 were more difficult to locate and/or enforce. 5 They are now consolidated into a single 6 chapter. 7 The IFC contains requirements for 8 the storage, use, and handling of all 9 hazardous materials in both new and existing 10 buildings. This would include requirements for 11 a site such as West, Texas Fertilizer 12 facility. The IFC establishes requirements for 13 ammonium nitrate storage, use, and/or handling 14 in the IFC Chapter 63 that deals with 15 oxidizers, oxidizing gases, and oxidizing 16 cryogenic fluids, and references the 17 requirements of applicable NFPA standards for 18 ammonium nitrate. 19 And, finally, Chapter 4 of the IFC 20 includes emergency planning and hazardous 21 material inventory statement reporting as part 22 of the fire code requirements for existing

Page 123 202-234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. 1 buildings that utilize hazardous materials and 2 addresses the preplanning that was previously 3 talked about at the earlier panel. 4 My colleague, Mark Roberts, will 5 now make a few comments about the 6 International Zoning Code as its use and 7 adoption relates to Texas. 8 MR. ROBERTS: Thank you. Thank you 9 for the invitation to be here tonight. 10 I'm the Senior Regional Manager 11 for the Government Relations Department of 12 International Code Council serving Texas. As 13 Bruce mentioned, the purpose of the 14 International Zoning Code is to safeguard the 15 health, property, and public welfare by 16 controlling the design, location, use or 17 occupancy of all buildings and structures 18 through the regulated and orderly development 19 of land and land uses within a jurisdiction. 20 The zoning code requires adopting 21 jurisdictions to have a zoning code official, 22 establish a Planning Commission, as well as a

Page 124 202-234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. 1 Board of Adjustments. 2 The duty of the Planning 3 Commission is to create and recommend to the 4 legislative body a Comprehensive Plan for the 5 physical development within the jurisdiction. 6 The Planning Commission is required to hold 7 public meetings that gives citizens the 8 opportunity to provide input for developing 9 the Comprehensive Plan. The Planning 10 Commission can consider areas outside of its 11 boundaries that may impact the Comprehensive 12 Plan. The plan must include official maps, 13 components that include growth and land use, 14 commercial/industrial uses, transportation and 15 utilities, community facilities, housing, take 16 into consideration environmental issues and 17 geologic natural hazards. 18 The zoning code official then 19 implements the Comprehensive Plan. Typical 20 zoning areas include agriculture, commercial, 21 commercial residential, factory industrial, 22 and residential zones. The intent of

Page 125 202-234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. 1 designating these zones is to create a 2 jurisdiction with compatible areas for 3 specific uses while separating non-compatible 4 uses into other zones. Also, by designing the 5 zoning code would separate commercial, 6 commercial residential, and residential zones 7 from factory industrial zones that could pose 8 a hazardous threat. 9 Of importance is the requirement 10 that lawfully established buildings and uses 11 in existence at the time of the adoption of 12 the zoning code shall be permitted to have 13 their existing use or occupancy continued 14 provided such continued use is not dangerous 15 to life. 16 So, how do we determine what is 17 dangerous to life? The zoning code isn't 18 designed to give specific criteria or hazards. 19 We use the International Fire Code sections 20 for existing structures and specific 21 requirements for hazardous materials that may 22 be present in those uses.

Page 126 202-234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. 1 The International Zoning Code is 2 an adoptable tool to provide a jurisdiction a 3 framework for zoning legislation and 4 implementation that regulates the location of 5 property uses and occupancies effective from 6 the adoption date forward. Existing structures 7 and uses are not retroactively affected. The 8 fire code, however, provides specific minimum 9 requirements to safeguard the community from 10 hazards posed by existing occupancies and uses 11 within structures. 12 That pretty much concludes what I 13 had to say. I'm open for questions. Thank you. 14 CHAIRPERSON MOURE-ERASO: Thank 15 you, Mr. Roberts. 16 MR. SCHWAB: Good evening members 17 of the Chemical Safety Board, Staff and the 18 members of the community behind me. On behalf 19 of the American Planning Association, I'd 20 certainly like to state that we certainly 21 regret the loss of life that occurred here and 22 dedicate ourselves to creating more resilient

Page 127 202-234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. 1 and safer communities with a high quality of 2 life for all of our citizens. 3 I'd like to tell you a little bit 4 first about APA and exactly what we do, and 5 what I do there so that I can set the stage 6 for some of my remarks that follow. APA is a 7 national organization representing members of 8 the professional planning community, about 9 40,000 across the U.S., some working overseas 10 in various kinds of international practice. 11 In a few days we're about to have 12 in Atlanta a conference with about 5,000 of 13 those who attend every year to soak up the 14 various kinds of professional education that 15 we offer to that professional planning 16 community, as well as the planning 17 commissioners and volunteer members of 18 planning commissions and zoning boards of 19 adjustment at the local level. 20 I happen to manage something we 21 call the Hazards Planning Research Center at 22 APA. It's one of three programs that make up

Page 128 202-234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. 1 something we call the National Centers for 2 Planning. The other two dealing with green 3 communities and community health. These are 4 attempts to get information, research, best 5 practices on some leading -- what we consider 6 leading edge planning issues out to this 7 community of practice. 8 One thing I want to state about 9 planning as we view it is, I understand we're 10 on a panel dealing directly with land use, but 11 we take in a broader swath of activity in 12 planning than land use alone. And I'll talk a 13 little bit about some of that as I move along. 14 And this attempt to address hazards takes in 15 more than just land use considerations, as you 16 will begin to understand. 17 So, what does the Hazards Planning 18 Research Center focus on? Well, to be honest, 19 and I shared this with the staff that talked 20 to me originally. I've spent most of my time 21 on natural hazards, but at the same time a lot 22 of the principles we have developed are

Page 129 202-234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. 1 perfectly applicable to questions of manmade 2 hazards. And, in fact, if you follow the 3 progression of planning dealing with 4 mitigation and disaster recovery as it has 5 evolved through FEMA, a great deal of it 6 actually focuses within the context of the 7 Department of Homeland Security on all hazards 8 planning. So, we understand that, you know, a 9 hazard is a hazard. There are different 10 characteristics, but nonetheless we -- if 11 we're going to make our community safe we have 12 to take an all hazards approach. 13 Typical of the kinds of things 14 that we have focused on really two key points. 15 One, that there's a place for planners to 16 intervene to help with that process of making 17 their community safer and more resilient 18 before disasters occur, which involves hazard 19 mitigation. And I'll get more into that in a 20 moment, as well as the recovery process after 21 a disaster. How do we rebuild a community 22 effectively and make it stronger and more

Page 130 202-234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. 1 resilient after an event has occurred? How do 2 we find those silver linings in the cloud that 3 give us the chance to rethink what a community 4 should look like after a disaster? 5 At the moment, we are actually 6 working with FEMA on the development of a 7 report due out this summer called, "Planning 8 for Post-Disaster Recovery - Next Generation." 9 It's the rewrite of a document from about 15- 10 16 years ago which I led at the time that is 11 focused on making some of these distinctions 12 between the things that we can begin to think 13 about through planning before a disaster even 14 with respect to the nature of recovery and 15 recovery management after a disaster, and 16 distinguishing those activities from those 17 that must inevitably follow the actual event 18 when we know the contours of the 19 reconstruction that must take place. A very 20 tricky subject but very important, and one 21 that we think that the entire nation really 22 needs to grapple with much more thoroughly.

Page 131 202-234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. 1 So, there are a number of 2 resources that we have developed over the 3 years. And I've been working to put many of 4 those at the disposal of your staff so that 5 they can absorb that into the kinds of 6 presentation you saw a minute ago from Jared. 7 One of them was developed actually 8 about 10 years ago called "The Growing Smart 9 Legislative Guidebook," which was -- it's 10 about 1,600 pages. It's great bedtime reading, 11 but it's a detailed approach without a one- 12 size-fits-all solution to modernizing state 13 planning and zoning enabling legislation which 14 gets at the question of what does the state 15 permit or require from its communities with 16 regard to both planning and zoning? 17 Also, I want to mention that about 18 20 years ago before I even anticipated getting 19 so involved in disasters that I produced for 20 APA at their request a document called 21 "Industrial Performance Standards for a New 22 Century," which is geared to the question of

Page 132 202-234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. 1 what kinds of conditions can be addressed with 2 regard to new industrial facilities at the 3 time that they are permitted so that you have 4 some performance standards that are expected 5 of that facility in an ongoing manner after it 6 is established. I can get into more detail on 7 that, but I just want to put that out there. 8 I also want to make clear that in 9 talking about hazard mitigation, and I 10 provided a document that we also did for FEMA 11 about four years ago called "Hazard Mitigation 12

13 which dealt with how you can effectively weave 14 hazard mitigation priorities into all aspects 15 of the local planning process and not have 16 them isolated as a special process where very 17 often the local hazard mitigation plans that 18 are done for FEMA approval are done by 19 emergency managers. Planners don't get 20 involved. We're trying to change that so that 21 there's a communication going on between those 22 two sets of professionals to make that a more

Page 133 202-234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. 1 effective document, and one more closely tied 2 to means of implementing solutions to hazards 3 in the community. 4 So that document, in particular, I 5 would encourage is something that can take 6 account of industrial hazards in the 7 community, get that research documented at 8 that stage, and then hopefully incorporate 9 that into a local Comprehensive Plan, as well, 10 so that you're addressing the kinds of issues 11 that are out there within the community of the 12 existing hazards and looking at some ways of 13 mitigating those hazards. We can get into more 14 detail on that, but I just want to establish 15 that point. 16 I want to conclude very quickly 17 with a little summary, because I think this is 18 extremely important about the applicability of 19 zoning and land use planning to these 20 particular problems with industrial 21 facilities. This is not isolated to the 22 question of ammonium nitrate, it's a question

Page 134 202-234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. 1 of, you know, any kind of chemical or 2 explosive hazard that may exist. 3 First point, which really gets to 4 a major issue that's come up here, is that 5 zoning should be understood essentially as a 6 prospective tool, not a reactive tool, not a 7 retrospective tool, but one that deals with 8 how you permit new facilities. That means that 9 an existing facility, the grandfathering is a 10 legal question. It means that you can't just 11 go back and, you know, after-the-fact impose 12 new conditions on a facility that is already 13 permitted. However, the exception here is, and 14 this is a critical one, is that where there is 15 a change or expansion of an existing use, that 16 changes the ball game because then you can go 17 back in and reestablish new conditions, or 18 apply current zoning in a situation where the 19 facility had been grandfathered. So, that is 20 the one situation in which you are able to 21 examine older facilities. Otherwise, 22 basically, you're looking at, you know,

Page 135 202-234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. 1 conditions on proposed facilities. 2 There is a flip side to this 3 zoning question, though, that I think is 4 absolutely critical and it was highlighted in 5 that presentation, which is if you've already 6 got the industrial facility in the case here 7 where it was out in open fields and there was 8 a fair amount of open space around it, you did 9 not have the level of hazard that was then 10 introduced over the years by the development 11 that gradually came closer and closer to that 12 facility. So, the zoning question is not 13 simply one of what is appropriate for that 14 facility? It's also a question of what is 15 appropriate around that facility once you 16 understand the nature of the hazard? And in 17 the case of an explosive hazard, I think you'd 18 want to know something about the potential 19 blast zone, what is the potential reach of the 20 impact of that explosion, and establish some 21 kind of a buffer around that area. 22 Clearly, that isn't something that

Page 136 202-234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. 1 happened. I don't know, you know, the history 2 of that, or why, but that is certainly 3 something that if I were a city planner I 4 would be looking at that all along as a 5 critical factor. And there are a lot of 6 solutions to that, some of them not 7 necessarily involving zoning, establishing, 8 you know, just an open space zone through 9 public acquisition or maybe originally 10 requiring that facility to acquire more space 11 around itself to prevent that development. You 12 can use various kinds of deed restrictions, et 13 cetera, to prevent those problems, but there 14 are solutions to that. 15 Once you've got the situation 16 where you've got a lot of development within 17 close proximity to that facility, that -- 18 those buildings are also grandfathered by 19 then. Yes, everything is grandfathered. What 20 happens then? Frankly, at that point, zoning 21 fails and what you've got is a situation where 22 you fall back on reliance on these fire, and

Page 137 202-234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. 1 health, and environmental codes that can take 2 other approaches to solving the problem. But, 3 basically, once you've already allowed all 4 that development to happen in such close 5 proximity, zoning is no longer a tool. You 6 forfeited that tool. So, I'll stop there. 7 MR. CONNEALY: Good evening, Mr. 8 Chair, Board Members, staff of CSB, and 9 certainly ladies and gentlemen in the 10 audience. I'm Chris Connealy, the State Fire 11 Marshal, and I had the misfortune of spending 12 a month here in West while we were doing the 13 fire investigation. To say that it had an 14 impact on first responders around the state 15 would be an understatement. This is the third 16 worst loss of life for firefights in Texas 17 history. Number one, ironically, was Texas 18 City, we discussed earlier in 1947. In 1956 19 the Shamrock Oil facility where 19 20 firefighters were killed outside Dumas in the 21 Panhandle area, and then 10 official 22 firefighters but 12 responders here in West.

Page 138 202-234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. 1 And seeing what this wonderful community has 2 gone through, and certainly the impact to the 3 families that have given up so much through 4 the loss of these folks that perished in this 5 incident and numerous injuries, and over $100 6 million worth of damage, we've got to make 7 sure it never happens again. So, I'm going to 8 just recapture the various things have been 9 going on. 10 There's been a lot going on since 11 April 17th. The Homeland Security Committee 12 and the House has met three times. They're 13 very much engaged. We just had a hearing this 14 past Monday, and I'll get to that in a second. 15 You know, when West occurred it 16 was late in the legislative session, and we 17 couldn't even tell the legislature how many 18 ammonium nitrate facilities were in Texas. So, 19 we had to combine two federal, two state 20 databases, remove the redundancy, and we came 21 up with 134 facilities. We still had concerns 22 if that was right, so we sent our Deputy Fire

Page 139 202-234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. 1 Marshals across the state to, one, ascertain 2 is ammonium nitrate in that facility. 3 Secondarily, offer a voluntary consultation, 4 basically a voluntary fire code inspection to 5 those facilities, and we've done that in 2013, 6 and we just completed it in 2014, of all -- 7 currently there's 96 AN facilities in the 8 state that have 10,000 pounds or more, split 9 over 66 counties. So, we have a good handle 10 where they're at. 11 The legislature wanted to create a 12 website that's on our website of the State 13 Fire Marshal Office where citizens can access, 14 type in their zip code and ascertain if 15 there's an ammonium nitrate facility in the 16 area. The map is pretty rough. Certainly, the 17 locals would know where that's at. You know, 18 we constantly balance security concerns, post- 19 Oklahoma City environment, along with public 20 right to know, and so that's been 21 accomplished. We had over 18,000 hits when it 22 launched from November 1st to December 1st,

Page 140 202-234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. 1 and it continues to be very successful and 2 desired by the community. And if you have a 3 facility in your area, the local contact 4 information of the fire department in the 5 service area is contacted to talk to what I 6 refer to as Mrs. Smith, the customer, so she 7 can ascertain what's going on. 8 As we develop this database, I'm a 9 big believer in transparency, and we have 10 shared that information not only with other 11 state agencies that are our partners in this 12 endeavor, but CSB, Department of Homeland 13 Security to make sure everyone has updates of 14 what the status is of ammonium nitrate 15 facilities in our state. 16 We have also - as I mentioned, 17 these consultations have been completed for 18 two years now. And, again, the Homeland 19 Security Committee wants to continue to do 20 more, and we've risen to that challenge. And 21 now we're doing these countywide Awareness and 22 Best Practices meetings amongst these 66

Page 141 202-234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. 1 counties. 2 I've been in Texas all my life. 3 Texas is huge, it's a challenge. And we've 4 completed 18 so far, so we have 48 more to go, 5 but we'll get there, and we're committed. That 6 will take through December. We do sign-up 7 sheets, we do evaluations. And, quite frankly, 8 the evaluations have been way beyond 9 expectations. The process, the first order of 10 business is describing the time line of what 11 happened in West, and then we go into more 12 detail what is ammonium nitrate, and the best 13 practices associated with storage of it. And 14 then we have a very frank discussion. Right 15 now we talk generically because the West line 16 of duty death report that we're charged by 17 state law to do, we expect to release that 18 next month, but in the interim we have a 19 policy, and I think you understand why, that 20 we brief the families first, and the fire 21 chiefs involved before we release it to the 22 public. And they have that right to see that

Page 142 202-234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. 1 first. 2 So, these presentations, these 3 county presentations will change significantly 4 on the third phase when we go into great 5 detail the operational things that occurred on 6 April 17th with the West Volunteer Fire 7 Department and other fire departments that 8 responded. So, those have been ongoing. 9 As I mentioned earlier, this past 10 Monday after having done all this research - 11 you know, this is a huge public policy issue, 12 and as I mentioned, West occurred late in the 13 last legislative session. I'm a firm believer 14 when you're developing public policy and 15 you're rushing it, you're going to miss the 16 target. And to the credit of the legislature 17 they agreed, and we've been very deliberate, 18 doing quite a bit of research. Many of your 19 staff I've talked to regularly and thank you 20 for that. 21 I know a lot more about ammonium 22 nitrate. I am not a chemical engineer, but I

Page 143 202-234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. 1 have a great appreciation what it does, and 2 understand it pretty well. Also gotten on the 3 FPA 400 Committee because we're determined 4 we're going to fix this issue. That said, we 5 had these meetings and they've gone extremely 6 well. We published the schedule where we're 7 going, we've put out a press release for the 8 next month where we'll be, and then the - we 9 also have it on our website. And we also send 10 an email to you and other agencies to let them 11 know where we're going to be. We also send it 12 to the Texas Ag Industry Association. Again, 13 we can't do this in a vacuum, not involving 14 the businesses that are making a living with 15 this product. 16 And farmers need fertilizer, and 17 I've said numerous times we are not trying to 18 put these AN facilities out of business; just 19 the opposite. West is discussing right now 20 having another fertilizer facility in the area 21 because it's a community that depends on 22 farming, and they need fertilizer. And they're

Page 144 202-234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. 1 having to go much further distances now to 2 acquire it. 3 You know, that business is one, 4 those jobs are gone, and we need to come up 5 with solutions that are reasonable. And very 6 briefly, what that is at this point, we 7 briefed the House, we'll be briefing the 8 Senate next month, is proposing adoption of 9 NFPA-1. Well, my good friends for the 10 International Code Council, the state has 11 always used NFPA in the past, but it's quite 12 a bit of similarities between the National 13 Fire Code and NFPA-1 for ammonium nitrate 14 facilities. And, also, for that process we are 15 proposing - because right now there are - 16 well, there's 96 facilities spread over 66 17 counties. We'll be at 92 very soon; for 18 various reasons these businesses are deciding 19 not to carry ammonium nitrate or different 20 formulations that's not explosive. They're 21 making those decisions on their own. But we 22 are looking to allow a three-year phase-in

Page 145 202-234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. 1 period because these businesses have a slim 2 profit margin. And I think when you're having 3 a retroactive aspect to code adoption you need 4 to be sensitive to these businesses to have 5 time to get to that point. 6 Certainly, I recognize there's 7 that danger in that period until you get 8 there, but also, we're also looking at - this 9 provision has been discussed, the 250,000 10 population. As I stated, Texas is huge, and 11 trying to manage a statewide fire code from 12 Austin in the State Fire Marshal Office is 13 daunting. I would rather it be managed at a 14 local level, and we're also proposing removal 15 of - or changing that statute so local 16 counties, regardless of population - 17 municipalities already can do that, that they 18 can adopt a local fire code. And they have a 19 better sense of how to manage things in their 20 community. 21 And, also, there's additional 22 funding that the legislature is interested for

Page 146 202-234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. 1 training firefighters, if you heard with both 2 volunteer and paid, and also more training 3 with emergency management officials and 4 elected officials that serve in that capacity, 5 as well. 6 There will be more discussions as 7 we move forward. The legislature in Texas only 8 meets every two years, so it's been, I think, 9 fortuitous that it's had enough time to really 10 drill down what the issues are here. And we'll 11 be having more hearings as we go along. 12 Is everyone on board with this? 13 I'd be lying to you otherwise, no. But I'm 14 encouraged that certainly the Lieutenant 15 Governor and the Speaker of the House have 16 issued interim charges. Our marching orders, 17 prevent another West in no uncertain terms. 18 And we're committed to that process. I've been 19 a firefighter for 36 years, and what we saw in 20 West was - I've never seen that many 21 firefighters die in one incident. If that 22 don't change, I don't know what is. And that's

Page 147 202-234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. 1 why we're on this, you know, tour of Texas. 2 You know, it's unprecedented but the feedback 3 is people are learning from the presentation, 4 and I'm hopeful that we've talked to about 775 5 folks of 18 meetings so far. This is very 6 rural areas. When we get said and done, we'll 7 have talked to two to three thousand people, 8 which is pretty significant representation of 9 rural Texas where most of these facilities 10 are. 11 And I really believe they're 12 getting it. And I think we're building - when 13 you do public policy, you just don't talk and 14 tell people what you should do, you also 15 listen, and that's what these outreach 16 meetings facilitates. And we're working with 17 industry and many other folks to, I think, get 18 this right. And I have no doubt that Texas 19 will make substantive changes next legislative 20 session, and that'll be in January. Thank you. 21 MR. DENTON: Thank you very much. 22 We'll turn it over to the Board, if you have

Page 148 202-234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. 1 any questions. 2 CHAIRPERSON MOURE-ERASO: Yes, are 3 there any questions for the Board? 4 MEMBER ROSENBERG: Yes, I just have 5 one. Is this on? 6 CHAIRPERSON MOURE-ERASO: Yes. 7 MEMBER ROSENBERG: Okay, thank you. 8 I just wanted to know how a local community 9 like West would adopt your code. 10 PANELIST: Simply, they would start 11 looking at the codes. They would need to hire 12

13 MEMBER ROSENBERG: Zoning code. 14 PANELIST: Zoning code. 15 Specifically, they would need to - the City 16 Council would need to organize hiring a fire 17 code official, I mean, I'm sorry, a zoning 18 code official, or a zoning code director, 19 planning director and start putting together 20 their Planning Commission. And through that 21 Planning Commission, hold the public meetings, 22 bring in the public and start planning the

Page 149 202-234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. 1 specific, you know, Comprehensive Plan that 2 they're putting out. I mean, it's not simple. 3 I mean, it's - 4 MEMBER ROSENBERG: No, they may not 5 have the money for it. 6 PANELIST: But the nuts and bolts 7 of the work is actually at the Planning 8 Commission level when they're actually putting 9 together the Comprehensive Plan. 10 MEMBER ROSENBERG: No, I understand 11 that. I was - 12 PANELIST: Adopting the zoning code 13 is just the framework of what they have to do. 14 MEMBER ROSENBERG: Okay. 15 CHAIRPERSON MOURE-ERASO: I'm 16 sorry. How about a fire code? 17 PANELIST: You want to take that 18 one? 19 MR. ROBERTS: Well, Mr. Chairman, 20 the conversation started a little bit in the 21 earlier panel about some of the restrictions 22 that exist in Texas law right now, so my

Page 150 202-234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. 1 understanding is that a county that doesn't 2 have a population of 250,000, or is not 3 adjacent to a county with that population is 4 prohibited from adopting a fire code. So, 5 State Fire Marshal Connealy was saying that 6 that's something that requires legislative 7 action to change, and that's going to be a 8 process that the State has to undertake. 9 You know, really when you look at 10 what ICC does, we're a membership 11 organization, so we produce a model code, and 12 we produce a family of codes. Fire code is one 13 of them. It's intended to work as a companion 14 code with the International Building Code and 15 other codes that address different aspects of 16 safety in the built environment. But that 17 model code needs to go through a formal 18 legislative process by a jurisdiction that has 19 the authority to adopt, administer, and 20 enforce that code. 21 And a big part of that is not only 22 going through that adoption process, and it is

Page 151 202-234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. 1 a process that requires public input, of 2 course, particularly on an initial adoption of 3 a code where one hasn't existed before. But 4 there's also a cost associated with that 5 adoption, and it's an investment in the 6 community. 7 The next step is the 8 administration and enforcement of any of those 9 model codes, and that requires resources, 10 whether it's from the State Fire Marshal 11 Office as a fire code enforcement, or that's 12 given down to the local level. There needs to 13 be resources in place, there needs to be 14 training so that code is understood and it's 15 consistently and effectively implemented in 16 the communities. So, it's a complicated 17 process, particularly on a jurisdiction that 18 doesn't have any codes and needs to move in 19 that direction. 20 CHAIRPERSON MOURE-ERASO: Thank 21 you. 22 MEMBER GRIFFON: Yes, I have a few

Page 152 202-234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. 1 questions. Let's start with Mr. Connealy. I 2 appreciate the update on what's been happening 3 in Texas since the incident. And I was 4 wondering if - and you might not be the 5 perfect person to answer this question, but 6 you're here, so I'm going to ask it. And I was 7 wondering if - what has Texas done since the 8 incident with regard to Land Use Planning? Has 9 that come up in the hearings, and is there any 10 initiatives, any work in - 11 MR. CONNEALY: It has come up, and 12 that's something, as these other gentlemen 13 have discussed, that is needed. We have a 14 number of facilities in the State that we 15 verified that are in downtown or significant 16 infrastructures by them. When we do these 17 county Best Practices meetings, we provide a 18 flash drive using the software program that 19 estimates the blast zone. We give that to the 20 local officials so they can use it for 21 emergency management purposes, of what is the 22 potential damage that's going to occur if

Page 153 202-234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. 1 something happened there. So, that's been very 2 well received. 3 But, yes, we're constantly 4 reinforcing. I mean, when we have these Town 5 Hall meetings, if you will, there's great 6 concern with that. And, hence, while we need 7 to get ammonium nitrate either retrofitted 8 with sprinklers if you're going to have it in 9 a combustible structure, or segregate it and 10 put it in a non-combustible storage bin. Both 11 those meet the code, Best Practices, if you 12 will, and we've largely resolved the issue 13 along with your general fire inspection for 14 other things. 15 But the scenario in West, as you 16 all know, as well as we do, that the fire 17 originated the seed room. It traveled to the 18 ammonium nitrate bin, and encircled it. 19 There's combustibles in the seed room, there's 20 combustible wood frame structures that 21 supports the building, and then we get - the 22 fire gets to the ammonium nitrate bin, it has

Page 154 202-234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. 1 plywood and wood supports in the bin. The fire 2 is continually growing. There's a roof over it 3 so there's pressure being built up, these 4 oxides of nitrogen that's being produced. We 5 also have carbon black that's dropping onto 6 the ammonium nitrate pile, and when the roof 7 structure, those wooden members are consumed 8 by the fire and the roof collapses into the 9 pile, we had two explosions. First is when the 10 roof structure collapsed as verified the 11 Seismic Center, and then milliseconds later 12 the big explosion everyone saw on TV. So, that 13 sequence of events can be managed either by, 14 in most cases, controlled by a sprinkler 15 system, or if the ammonium nitrate is not in 16 that combustible structure, you've gone a long 17 ways to minimize your risk exposure. So, that 18 sequence of events, there has to be an 19 interject. And if you can do that - 20 obviously, we would prefer to see these 21 facilities in a non-inhabited area, but we 22 have 46 that have combustible construction of

Page 155 202-234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. 1 these 96 facilities, and that's why we have 2 the retroactive provision because we're not 3 going to change anything unless we get 4 retroactive requirements to have them come 5 into compliance, as well. We just have to get 6 ammonium nitrate away from combustibles. 7 MEMBER GRIFFON: And I was actually 8 asking the question also in terms of the 9 broader question of just high-hazard 10 facilities, you know, and how they are - how 11 you do the Land Use Planning for those around 12 the state, and whether any - and I don't know 13 what the current situation is. Does the State 14 put out guidance - I think I'm following up 15 on Dr. Rosenberg's question, you know. I can 16 picture the local Planning Board grappling 17 with how to zone for a high-hazard facility, 18 and whether, you know, is there guidance from 19 the State? Are there, you know - and are 20 there any recommendations to improve or change 21 that, or that kind of thing? 22 MR. CONNEALY: Absolutely. We want

Page 156 202-234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. 1 to make sure that cities have the capability 2 to provide zoning. If they don't have a local 3 zoning issue or a building code, or fire code, 4 there's a remedy there that removes those 5 barriers so they could do just do that. 6 The challenge is with existing 7 facilities and the infrastructure that's 8 around them, you know. I'm not sure how that 9 will play out long term because they're there, 10 such as West. The town grew up around it. 11 MEMBER GRIFFON: Right. 12 MR. CONNEALY: There's no malice 13 involved. It just happened. 14 MEMBER GRIFFON: Yes. 15 MR. CONNEALY: You know, as was 16 stated earlier, that we like to be (inaudible) 17 more of the planning than I am. 18 MEMBER GRIFFON: Okay. 19 MR. CONNEALY: That there's ways of 20 avoiding that. In some cases, you know, the 21 cow is already out of the barn. 22 MEMBER GRIFFON: Thank you. Thank

Page 157 202-234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. 1 you. I just wanted to ask ICC, the - you 2 mentioned the International Zoning Codes. How 3

4 they address siting a hazardous facility near 5 a community, or what guidelines do you have, 6 or some specificity on how it deals with 7 residences, schools, a situation like that was 8 here? 9 MR. ROBERTS: The code, basically, 10 just establishes zones, whether it's 11 commercial, commercial residential, 12 residential, factory industrial, schools 13 generally fall in line with zoning with 14 residential. And it just allows - the 15 community has its own geographical area to 16 deal with about how to split those up. 17 MEMBER GRIFFON: Okay. 18 MR. ROBERTS: So, as far as exact 19 guidelines about a hazardous facility, it 20 would just fall as factory industrial, and 21 then you would rely on other codes like the 22 fire code for guidance on just what that

Page 158 202-234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. 1 hazard is. 2 MEMBER GRIFFON: Okay. And does it 3 include any kind of risk assessment, or risk 4 analysis? 5 MR. ROBERTS: Not in the zoning 6 code itself, but - 7 MEMBER GRIFFON: Not in the zoning 8 code. 9 MR. ROBERTS: - but certainly in 10 the fire code - 11 MEMBER GRIFFON: The fire codes. 12 MR. ROBERTS: The fire code, you'd 13 have risk assessment on each structure. 14 MEMBER GRIFFON: Okay. 15 MR. ROBERTS: For existing, as 16 well. And, again, like we've said over and 17 over, the zoning code would not apply to 18 existing structures. 19 MEMBER GRIFFON: Right. 20 MR. ROBERTS: You would have to go 21 to a fire code for that. 22 MEMBER GRIFFON: Right. And then

Page 159 202-234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. 1 the - this question is kind of open, I think, 2 to anyone. The question of the local Planning 3 or Zoning Boards, you know, I'm just wondering 4 how - just from all your experience whether 5 they have the resources, the tools, the 6 capability of making these judgments on - you 7 know, I think part of it is they have to know 8 enough about these complex facilities to 9 determine, and to do those calculations to 10 determine if the risk is too great to put this 11 type of facility in proximity to schools or 12 other sensitive areas. So, I'm wondering if, 13 you know, in your experience what's the 14 capabilities of the local Planning Boards? 15 MR. SCHWAB: I would like to offer 16 a little different model here on that point, 17 because one of the things that we've worked 18 very hard to emphasize in this regard is, you 19 know, planners have a certain kind of 20 training. They have to understand spatial 21 relationships within a community, they 22 understand issues about economic and community

Page 160 202-234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. 1 development, and so on, but can't possibly be 2 trained themselves in depth on issues like how 3 ammonium nitrate is handled. 4 MEMBER GRIFFON: Right. 5 MR. SCHWAB: That's just not part 6 of their training. What we can do, however, is 7 planners are very well trained in most cases, 8 or should be as, effectively, orchestrators of 9 public policy within a community. And 10 particularly, also, orchestrators of public 11 participation within a community to rally the 12 public to participate in the process of policy 13 making. 14 One of the things that they can do 15 as a result is figure out who does have that 16 expertise and how to bring them, effectively, 17 into the planning process. And we go through 18 this model repeatedly on a number of 19 questions, not just this one. Just let me give 20 you a couple of examples. 21 A few years ago we were working 22 with the Forest Service on a project called,

Page 161 202-234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. 1 "Planning the Urban Forest." Planners are not 2 foresters, they're not expected to be 3 arborists, they're not tree specialists, but 4 clearly they understand that that's a goal 5 within the community to have better tree 6 canopy, and it does all sorts of - they can 7 begin to understand what are the outcomes of 8 that that benefit the community. So, what you 9 do is then go and get that expertise. You have 10 arborists, or urban foresters, or people with 11 that expertise and you bring that - you have 12 that discussion about where you can inject 13 that expertise into the planning process. 14 The same thing goes with this 15 whole field of all kinds of disasters, natural 16 or manmade. There are emergency managers who 17 have a good deal of that expertise. There are 18 firefighters who have that expertise, and you 19 bring them into that discussion, and then talk 20 about where in the - what would be an 21 effective element of that zoning code, at 22 least prospectively looking at facilities that

Page 162 202-234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. 1 don't exist already, to address those kinds of 2 things up front before you start permitting 3 development. So, a lot of this is really 4 communication and coordination between - 5 interdisciplinary communication and 6 coordination that has to go on to make this 7 happen effectively. 8 The code that they're talking 9 about provides a certain basic framework, but 10 beyond their code, I would say from long 11 experience and watching communities function, 12 and looking at the peculiarities and 13 idiosyncracies of every community, there is 14 inevitably some customization that must take 15 place. And there is no escaping the 16 responsibility in local planning of thinking 17 through what are the issues that confront us 18 in this particular landscape within these 19 boundaries, whether that be ammonium nitrate, 20 or a railroad that goes through that may be 21 carrying who knows what. You know, you just 22 need to take a look at what is in that

Page 163 202-234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. 1 community that poses a threat, and then figure 2 out what is an effective solution, bringing 3 together the best expertise you can marshal. 4 MEMBER GRIFFON: Well, thank you 5 for reframing my question, actually. You got 6 to the point that I wanted to get to, so that 7 was very good. I guess I could see, and you 8 don't need to necessarily answer this 9 question, but I guess one concern that could 10 come up in that kind of scenario is as a local 11 Planning Commission is bringing together 12 expertise, I think often it's likely that the 13 most in depth expert in the room is going to 14 be the very people that are trying to build 15 their facility. So, can - does the town have 16 independent resources to pull in when there's 17 a question, or - 18 MR. SCHWAB: Actually, this gets to 19 a much - an even - I'm going to reframe even 20 larger here. 21 MEMBER GRIFFON: Oh, please, 22 please.

Page 164 202-234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. 1 MR. SCHWAB: Because it does get to 2 the question of a State role, but it also gets 3 to other kinds of resources that are out 4 there. I mean, I think you have to think 5 outside the box sometimes. 6 MEMBER GRIFFON: Yes, I agree. 7 MR. SCHWAB: There are, for 8 instance, academic resources, community 9 colleges, universities that often have the 10 kinds of expertise without being tied to a 11 particular industry or vested interest that 12 can be tapped. And we often - you know, that 13 I think is one great tool. 14 There are states that actually use 15

16 extension service that includes planning 17 advice for local - particularly for rural 18 communities, you know, they make their 19 planning school essentially available to those 20 communities to help with that process. 21 MEMBER GRIFFON: And that's why I 22 asked the prior question, was as the State -

Page 165 202-234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. 1 I mean, I think State guidelines in this area 2 might be very useful to help - 3 MR. SCHWAB: Yes, and the State - 4 MEMBER GRIFFON: - so that local 5 communities know where to turn if they're, you 6 know, looking for those other resources. 7 MR. SCHWAB: Sure. The State itself 8 actually can on occasion, you know, if it 9 chooses provide some of that kind of technical 10 expertise. 11 MEMBER GRIFFON: Great, great. 12 Thank you. Thank you. 13 MR. ROBERTS: Mr. Griffon, if I 14 may. 15 MEMBER GRIFFON: Oh, sorry. 16 MR. ROBERTS: I'd just a little bit 17 to Mr. Schwab's perspective there. You know, 18 we're looking at that we mentioned before the 19 all hazards approach, you know, and I think we 20 have a multidisciplinary item that we have to 21 look at here. And maybe from that 10,000 foot 22 level the reason that the ICC produces a

Page 166 202-234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. 1 family of codes is that they're all meant to 2 coordinate and work together, and not just 3 focusing on ammonium nitrate, or even 4 hazardous materials but, you know, other 5 natural events that we have to address in our 6 communities. That's why if you have a 7 community that just has a construction code, 8 that's probably not enough because we want to 9 make sure that that building is kept at that 10 level of safety throughout its life, and 11 that's where a fire code comes in. Putting the 12 right buildings, you know, in the right places 13 is about the zoning code, and that's the 14 proactive piece. 15 And just examples, you know, of 16 part of the construction code, we take for 17 granted that there's an National Electric 18 Code. Well, if we just follow the construction 19 code and we don't deal with the safety of 20 electric, we haven't created a safe building. 21 If we haven't adopted a fuel gas code, we may 22 have fuel gas in that building. It's not going

Page 167 202-234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. 1 to fall down, but we may not have a safe gas 2 service. So, those codes all need to be 3 coordinated. 4 And kind of de facto what that 5 does is it brings all those different 6 expertise, those different disciplines of code 7 officials together to insure that all of those 8 things are being addressed comprehensively 9 when you look at how a building is built, and 10 how it's maintained. So, not having that 11 comprehensive approach, you're working with a 12 handicap because you haven't utilized all the 13 resources in the toolbox to help address that 14 concerns that we're here to prevent, and 15 that's basically keeping a safe and 16 sustainable environment. 17 MEMBER GRIFFON: Thank you for the 18 addition. And thank you, Mr. Chairman. 19 CHAIRPERSON MOURE-ERASO: Thank 20 you. I have perhaps a last question, and 21 probably is a historical question to Mr. 22 Connealy, and probably to Mr. Johnson, too.

Page 168 202-234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. 1 And the question is why isn't that in Texas 2 what's considered some sort of a reasonable 3 approach not to have a fire code on the small 4 towns? I mean, what is the historical reason 5 that this happened? 6 MR. CONNEALY: Mr. Chair, I 7 honestly don't know. I don't know where that 8 statute originally came from, and why, but I'm 9 very encouraged that the legislature, at least 10 the House - 11 CHAIRPERSON MOURE-ERASO: Is there 12 any advantage not to have a fire code? 13 MR. CONNEALY: Well, as a fire 14 marshal I don't think so, obviously. 15 (Laughter.) 16 MR. CONNEALY: I'm very pro fire 17 code. As I stated earlier, I think it's better 18 managed at a local level. And I'm very hopeful 19 that that will change. And I think with the 20 events of West that has shed light, and I 21 think that will come to fruition this time 22 around.

Page 169 202-234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. 1 CHAIRPERSON MOURE-ERASO: Mr. 2 Johnson. 3 MR. JOHNSON: No, I think the State 4 Fire Marshal, it's a public process so now 5 that there's awareness, and I think that 6 there's an opportunity to create a better 7 understanding of what a fire code is - what 8 it is, and what it isn't. I think there's a 9 lot of fear that it's going to cost a lot, 10 there's over-regulation. And it's really 11 through the consensus process, it's really a 12 balance of trying to find that proper level of 13 minimum safety and not be an economic 14 disincentive. 15 But that's why jurisdictions have 16 that option, and there may be State 17 amendments, even if they do adopt a fire code 18 to address specific requirements that are 19 unique to Texas or that jurisdiction. 20 And then, finally, as I mentioned 21 that the other challenge, and there's some 22 good models and examples of best practices.

Page 170 202-234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. 1 Having the resources to implement that code 2 and do the inspections that are necessary and 3 the administration is a key ingredient to 4 having a truly safe and sustainable 5 environment. So, adopting the code and having 6 the authority to do that is just the first 7 step in that process of insuring the safety of 8 the built environment. 9 PANELIST: It might be worth 10 noting, too, that not only do we have the fire 11 code issue, Texas is the only state that I 12 know of that does not give its counties zoning 13 authority either, which is something that 14 might be worth considering in the next 15 legislative session. 16 CHAIRPERSON MOURE-ERASO: Very 17 interesting. Very interesting. Okay. I would 18 like to thank the panel. This has been very, 19 very informative. 20 MEMBER ROSENBERG: Thank you. 21 (Applause.) 22 CHAIRPERSON MOURE-ERASO:

Page 171 202-234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. 1 Appreciate you bring here. 2 I would like now to give the floor 3 to Dr. Daniel Horowitz, the Managing Director 4 of the Chemical Safety Board to direct the 5 discussions on public comment, so Dr. 6 Horowitz. 7 DR. HOROWITZ: We'll have public 8 comments on any aspect of what you heard, or 9 anything that you didn't hear that you'd like 10 the CSB to look into further. Only a handful 11 of people signed up for comments, but really 12 it is open to anyone who would like to say 13 anything for three to five minutes. And when 14 you make your comment, please do say and spell 15 your name so that we can get it right in the 16 transcript. 17 Mayor Muska, did you have an 18 additional comment you'd like to make? Go 19 ahead. If you want, you can use either podium. 20 MAYOR MUSKA: Thank you. And, 21 again, my thanks to the Chair, and Directors, 22 and investigators on your work this past year.

Page 172 202-234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. 1 West has come a long way. We 2 didn't have a fire code, we're working on a 3 fire code. We didn't have a building code, we 4 now have a building code in place. West is 5 moving forward. 6 It will not be defined by the 7 events of April 17th. Zoning and Planning, we 8 have secured with donation from St. Vincent de 9 Paul, KAI Group out of Atlanta, and they have 10 come in. And your question was how do you do 11 that? We had a group of business leaders that 12 were the core of it, and they met with the 13 business leaders first. And then we had about 14 three different public meetings on planning. 15 Now, this is planning that is 16 outside the city limits right now, but we have 17 an idea of where we will be going. So, for 18 instance, by the Interstate it'll be 19 commercial. Down east of West will be more 20 residential, so we will have a plan, a 21 Comprehensive Community Plan that we're 22 working on. That should be finalized by, I

Page 173 202-234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. 1 think, the end of this month or next month. 2 You mentioned fire sprinklers. 3 Yes, fire sprinklers or concrete bins would 4 definitely be, you know, something that could 5 save a lot of lives if this were to happen 6 again. 7 And as I sit here and I listen to 8 the various suggestions from the Chemical 9 Safety Board and the investigation of 417 10 Fertilizer Plant, I can't help but wonder if 11 the agency is looking in the wrong direction. 12 In my opinion, you are looking at the 13 distribution end of nitrogen-based fertilizer 14 products, and the products and the safety 15 hazards it poses to communities located around 16 these plants that store the product. 17 It seems to me that it would be 18 more effective and easier to regulate if you 19 had a handful -- a mandate for a safer 20 product. Then you're managing a handful of 21 manufacturers instead of thousands and 22 thousands of fertilizer plants. It just seems

Page 174 202-234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. 1 that would be the easier way if you wanted to 2 do that, in my opinion, my humble opinion. 3 It my opinion, it also needs to 4 concentrate on the safer production of this 5 which would then remove the safety hazards 6 associated with it being transported. You 7 heard a number of trains come through here. I 8 can guarantee that that was probably on some 9 of those trains that go through this town 10 every day. So, if it was a safer product, the 11 transportation of that product would also be 12 safer, in addition to the storage at the 13 facilities. 14 The end result would be a safer 15 product and would also reduce the unlawful use 16 of the said product such as the case in 17 Oklahoma City. And as well noted, the cases 18 that - where the product was used in Iraq and 19 Afghanistan as an IED component to a bomb. The 20 military is already looking at this because 21 that's the main ingredient of IEDs in Iraq, 22 was nitrogen-based fertilizer.

Page 175 202-234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. 1 As for the Land Use discussion, I 2 have many concerns and strong opinions on the 3 lack of regulations for a general law city the 4 size of West. Due to state law we do not have 5 the ability to regulate any activity outside 6 our city limits. We don't have the ability to 7 regulate anything inside the one-half mile 8 ETJ, which is the Extra Territorial 9 Jurisdiction. We don't have the ability to do 10 that. That is something that Texas law 11 prohibits a town the size of West from doing. 12 I'm working on that. That's one of my marks 13 that I'm working on, but your report states 14 that cities have the responsibility to enforce 15 the fertilizer plants, but my question is how 16 we could regulate a fire code when we - when 17 most plants are outside our jurisdiction. We 18 can have a fire code across the tracks from 19 it, but if it's across the tracks, it's not 20 going to be in our jurisdiction so we cannot 21 tell it what to do. 22 The City of West Fire Department

Page 176 202-234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. 1 is only responsible for fire protection in our 2 corporate city limits. Any response to outside 3 fires is a matter of courtesy, and we respond. 4 It is my hope that the lessons 5 learned from the April explosion, and the fire 6 departments across the country have taken a 7 closer look and interest in how they respond 8 to chemical fires. If that occurs, then the 9 lives of the first responders that perished 10 won't go in vein. These opinions are my own, 11 and I appreciate the opportunity to speak to 12 you today. Thanks. 13 CHAIRPERSON MOURE-ERASO: Thank 14 you, Mr. Mayor. 15 (Applause.) 16 CHAIRPERSON MOURE-ERASO: A comment 17 I would like to say to your comments, one of 18 the - or the issues that we are looking very 19 carefully, and the investigative team is 20 looking is at inherently safer technologies on 21 the materials itself that we are using as 22 fertilizers. And one of the things that we are

Page 177 202-234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. 1 looking at is what kind of formulations could 2 be there, could be rethought that will make 3 the ammonium nitrate substantially less 4 explosive than it is. And that is something 5 that is what you are suggesting, that is 6 rather than looking at what we have, why don't 7 we look at the front end of the process and 8 see what is what we are using, and how can we 9 make that safer rather than trying to 10 remediate what could happen at the final end. 11 MAYOR MUSKA: I was doing research 12 and it cost about 15 cents a ton to put a 13 coating on ammonium nitrate, so it's not 14 overbearing, I think, or cost prohibitive to 15 do that. And this technology has been around 16 for about 10 years, so that's an area, like I 17 said, if you chop it off at the head, you 18 don't have to worry about it. 19 DR. HOROWITZ: Thank you. And I 20 think we'd be remiss if we didn't thank the 21 Mayor also for helping us arrange the facility 22 tonight, and for your hospitality to our team

Page 178 202-234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. 1 when we were here for several months under 2 very difficult circumstances. So, thank you. 3 CHAIRPERSON MOURE-ERASO: And also 4 let me add for the leadership that the Mayor 5 has demonstrated in this very difficult year. 6 I would like to congratulate you in the work 7 that you have done for this town. 8 MAYOR MUSKA: Thank you. 9 (Applause.) 10 DR. HOROWITZ: Next is Mr. John 11 Crowder, Pastor, First Baptist Church. Mr. 12 Crowder. 13 MR. CROWDER: Thank you, Mr. 14 Chairman, Members of the Board. In the first 15 part of our meeting tonight we heard Mr. 16 Corbett read from approved manuals information 17 about how firefighters should respond to fires 18 in which ammonium nitrate is involved. The 19 prescribed plan of action, as I understand it, 20 is to apply water unless the fire gets too 21 serious or "massive." If the fire is too big, 22 firefighters are encouraged to withdraw.

Page 179 202-234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. 1 It's my understanding that our 2 firefighters appropriately implemented those 3 suggested plans. Although no one mentioned it 4 here tonight, an order was given that night to 5 withdraw. While we have all had an entire year 6 to assess the situation, to evaluate the needs 7 and prioritize the various options, our 8 firefighters had 20 minutes to get to the 9 scene and then do all that assessment, 10 evaluation, and clarification of priorities. 11 Within that short 20 minutes, our 12 local heroes showed up, got organized, did 13 exactly what the expert tonight said they 14 should have done. They put water on the fire 15 until it was clear that the fire was 16 "massive." At that time, they made the right 17 call and ordered a defensive stance. 18 Unfortunately, time ran out before they could 19 fully carry out that order. Our heroes gave 20 their lives insuring a future for their 21 families, friends, and neighbors, and we as a 22 community will always be grateful for their

Page 180 202-234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. 1 sacrifice. 2 (Applause.) 3 DR. HOROWITZ: Thank you, Mr. 4 Crowder. And just for clarification, I think 5 what Professor Corbett was quoting was the 6 NFPA guidance, actually, which he was stating 7 was effectively followed, and he'd like that 8 guidance to be changed in light of this 9 tragedy. 10 Next is Ken Paterson. Mr. 11 Paterson. Charlie Musclewhite (ph). 12 MR. MUSCLEWHITE: Thank you. Thank 13 you for being here. Thank you for what you've 14 done over the last year. I also want to thank 15 Mayor Tommy and Pastor Crowder. I echo exactly 16 their comments. I'm a property owner in West 17 now. 18 I had the same question as Mayor 19 Tommy, which is - and Pastor Crowder brought 20 it up to some extent. We heard a lot of talk 21 about what the firemen should do, and not do, 22 and the first responders, and even the elected

Page 181 202-234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. 1 officials, that we're looking at how to change 2 behaviors there. And a lot of talk about what 3 the City of West should do, and the growth 4 pattern, et cetera. And like Mayor Tommy, I 5 didn't hear anything tonight about the 6 manufacturers of the product until, Mr. 7 Chairman, you brought it up in response to 8 Mayor Tommy's question. 9 I greatly appreciate hearing that. 10 I think that's a very important aspect of your 11 investigation, and it's good to hear that 12 you're on top of that. 13 Mr. Fire Marshal, you mentioned 14 that there are four facilities in this state 15 right now that have stopped distributing 16 ammonium nitrate fertilizer based nitrogen 17 product, and I applaud that. I'm curious, if 18 four can do it, why can't they all do it? Why 19 can't the manufacturers themselves stop it? 20 What is the need for it? If you can make it 21 safer, as Mayor Tommy says, for so little 22 money why not do so?

Page 182 202-234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. 1 I stepped outside about halfway 2 through this meeting and there was a train 3 stopped outside, literally less than a 4 football field from this facility, and all I 5 could count because it was hopper car from 6 horizon to horizon were 40 hopper cars. And as 7 Mayor Tommy said, any one of those hopper cars 8 could contain the exact same nitrogen-based 9 fertilizer product that blew up and that 10 survived in the hopper car that was waiting to 11 be distributed. And no one - I don't know how 12 I know as a citizen whether or not this group 13 of hopper cars contains potentially a small 14 nuclear device, 30,000 tons in any hopper car. 15 It's mind boggling to me that the 16 manufacturers can put the product out into the 17 stream of commerce like this without warning 18 the public, identifying it. And at some point 19 someone asked about who is in the best 20 position, who had the most knowledge to be 21 able to determine what to do about this 22 potential danger that many people are facing

Page 183 202-234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. 1 without any knowledge? 2 According to what I heard from the 3 fire marshal, there are 46 facilities in this 4 state that are still storing nitrogen-based 5 fertilizer product in combustible facilities. 6 And, again, where are the manufacturers, and 7 I've heard the term in this state is, "Me no 8 Alamo," and it refers to the fact that these 9 are the guys who are making the money off of 10 the product. Why aren't they going to these 11 places and insuring that their product is not 12 being delivered by the ton, by the tens of 13 tons, by the thousands of tons to these 14 facilities with these combustible materials 15 that are holding it in, and avoid a repeat of 16 what happened here just over a year ago. So, 17 I again want to echo the comments of Mayor 18 Tommy and Pastor Crowder, and just make that 19 point. 20 I don't know, every time I pull up 21 to a train crossing now and watch these hopper 22 cars go by, I do not know in my mind whether

Page 184 202-234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. 1 or not any one of those cars were it to - 2 that train to go off the track, what would 3 happen? Am I looking at being Ground Zero in 4 a small nuclear device detonation? I mean, 5 that's the fear I have just as an ordinary 6 citizen. 7 The fact that these train cars 8 stop in this city, you can move the facility 9 outside of the Town of West even further, but 10 if it's on those train cars and those train 11 cars are parked so that they can switch, 12 because this is a switching town where they 13 pass each other, there's still going to be 14 people exposed. I mean, you can do all that 15 you want to do at any one distribution point. 16 That's still not going to protect the public 17 as the product is coming from Yazu, 18 Mississippi to these 92 towns in the State of 19 Texas, and sitting in these 92 towns in the 20 State of Texas, at this the height of the 21 growing season. 22 I'm curious what the chemical

Page 185 202-234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. 1 companies have told you that they have done 2 since this explosion last year to avoid this 3 kind of exact occurrence happening again this 4 year. I mean, we are here at the height of the 5 growing season when fertilizer, including 6 nitrogen-based fertilizer products are 7 supposedly floating around the state to this 8 96 facilities, so I'm curious if you all have 9 heard from the chemical companies what they're 10 doing to minimize the risk, such as going to 11 these 46 remaining facilities that have a 12 combustible storage situation and saying look, 13 we're not going to deliver to you unless you 14 get it built right. So, that's my question. 15 CHAIRPERSON MOURE-ERASO: A comment 16 to your question. We have been in contact with 17 the Fertilizer Institute, and also with other 18 organizations that are representing the 19 manufacturers of ammonium nitrate. And they 20 have reacted very swiftly in organizing an 21 organization among themselves that is going - 22

Page 186 202-234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. 1 I mean, it's a very well organized code of 2 conduct among the people that - in the 3 organizations that are using the chemical. And 4 we have been very positive about that 5 development. 6 What worries us is that only the 7 people that belong to that organization are 8 the ones that should choose, should volunteer 9 to adopt that code and to adopt those 10 practices. And as we know, there are a number 11 of distributors of the chemicals, and sellers 12 of the chemical that have - will choose not 13 to volunteer. So, that's why, as you will see 14 in the way that we are developing our 15 investigation, we are looking at making a 16 regulatory analysis and see what will make 17 people and the industry pay attention and 18 accept a particular change that will make a 19 difference, is that we have a regulation. We 20 have a regulation that applies to everybody 21 that makes a level playing field for 22 everybody, and that is not volunteer. You

Page 187 202-234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. 1 cannot choose not to do it. I mean, that's the 2 difference with having a regulation. So, in 3 our paths of investigation what we are looking 4 is what that regulation must be that compel 5 people to do this legally rather than simply 6 rely on establishments volunteering to do it. 7 DR. HOROWITZ: Thank you. Next is 8 Jack McCavitt (ph). 9 MR. McCAVITT: Thank you, Mr. 10 Chairman, and Board, and investigative staff 11 for the opportunity to speak to you. 12 A few minutes ago, our State Fire 13 Marshal spoke with wisdom I thought when he 14 was talking about the loss of the 15 firefighters. And he said we have to make sure 16 this never happens again. And we certainly all 17 support that. And I agree completely that it's 18 appropriate for the Board to be concerned 19 about emergency response, and Land Use 20 Planning, but I hope that the Board will put 21 even more emphasis on prevention of fires 22 impacting ammonium nitrate and the safe

Page 188 202-234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. 1 storage of ammonium nitrate so that the 2 firefighters are not ever exposed to the risks 3 of those fires. Thank you. 4 DR. HOROWITZ: Anyone else who 5 would like to comment, who didn't - David, 6 please. For those of you who don't know, David 7 White, the publisher of Industrial Fire World 8 has long worked with the CSB on education 9 efforts for oil site safety, which we very 10 much appreciate. 11 MR. WHITE: I was going to kind of 12 slip up here and not let anybody know that I 13 was here, but I guess that didn't work. But 14 seriously, thanks to the Board, and the Staff, 15 and the invited speakers and things. 16 I've been around a long time in 17 this business called firefighting. I've seen 18 four firefighters killed at fires that I was 19 at. It's not a good day. And firefighting is 20 a dangerous game. And I don't use the word 21 game just because we are going in when 22 everybody is coming out. And the thing about

Page 189 202-234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. 1 firefighting we have to understand is, in my 2 50 years, and that's how long I've been in 3 this game, we have been teaching and talking 4 about the same things, pre-fire planning, 5 training, you know, and things like that. 6 I don't know if we'll ever get 7 there. And I'm being very honest because, you 8 know, it's not rocket science to go out here 9 and inspect a building, you know. I mean, and 10 you don't have to - and I'm going to tell you 11 this, you don't have to be a certified fire 12 inspector with a Ph.D. I mean, I can go in a 13 building say, man, you've got ammonium nitrate 14 here. And then you talk to the guy about it 15 and so on and so forth. And we can make a big 16 effort on this across this great State of 17 Texas if we'll just go out there and do 18 something. 19 I mean, I don't know what the 20 number is, but I know there's over 2,000 fire 21 departments in Texas, and how many of those 22 have the firefighters even walked in the door

Page 190 202-234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. 1 to say what have they got here? And that's 2 what we've got to do. We're firefighters, 3 that's the game we play, that's the job we 4 have. And I think that we just need to wake up 5 and quit offering excuses. 6 I mean, the industry - and I'm 7 working, making a living on industry. But 8 industry will sit there and then they'll mealy 9 mouth around about it, and then all of a 10 sudden they'll say well, we've done the best 11 we can. No. We haven't - here they come now. 12 (Laughter.) 13 MR. WHITE: See? I mean, that's 14 planned. You got that scheduled just right 15 this time. But what I'm saying to you, one 16 other thing that I want to tell you about 17 ammonium nitrate, and I've been around it 18 because I'm from South Texas, we lived on 19 fertilizer and plants and things. 20 I never saw ammonium nitrate fire, 21 but I know it happens. I've seen all the 22 videos and the pictures, and everything else.

Page 191 202-234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. 1 I want somebody to go out there and push the 2 government or the industry push somebody to do 3 some research because I want to know why at 4 West, Texas you had a building full of 5 ammonium nitrate, you had another building 6 full of it, and this one blew away and killed 7 a bunch of people, and this one is still 8 there. I want to know why in Bryan, Texas. I 9 live in College Station right next door, they 10 had a building full of ammonium nitrate on 11 fire and some of it was in sacks. And I 12 remember hearing the volunteer firemen that 13 day saying I don't know what this stuff is but 14 it says it's ammonium nitrate, and the stuff 15 is burning right in front of him. Why did he 16 even have to ask when he figured out it was. 17 He should know that. 18 The other thing is, I go around 19 the world and I look at different plants and 20 things, and I've been into explosive plants in 21 Europe and things like, and done consulting 22 work. You know what a lot of them do? And this

Page 192 202-234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. 1 is the cheapest thing you can. They berm up 2 the dirt about 15-foot high, as much as they 3 can around the plant, plant heavy forests or 4 trees on top of that, and then if there's a 5 blast either here or here, that blast hits 6 those trees and that berm, and it's diverted 7 up. And right there is not even hardly hurt. 8 I've seen the research photos that show that. 9 But I still want the National Bureau of 10 Standards or somebody to go out here and 11 please help us by whether it's 15 cents a 12 thousand as somebody said, or it's $5 a 13 thousand. I don't care. We've got to do it 14 better, and safer, and smarter. Thank you very 15 much. 16 (Applause.) 17 DR. HOROWITZ: Thank you. Anyone 18 else? 19 MR. WEEKS: Can we just ask a 20 couple of questions of the - 21 DR. HOROWITZ: Sure. You want to 22 come to the mic, or one of the mics and we'll

Page 193 202-234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. 1 help you as best we can. 2 MR. WEEKS: Hi, my name is David 3 Weeks. The 40 to 60 tons you mentioned it may 4 be have been in one bin or two, what is your 5 best guess? 6 PANELIST: In talking to employees 7 they place the majority of the material in the 8 northeast corner, quadrant of the - or 9 northwest quadrant of the building. 10 MR. WEEKS: What is the size of the 11 bins in terms of length, and width, and 12 height? 13 PANELIST: Well, we're still 14 establishing that. 15 MR. WEEKS: You're still - so, in 16 your discussions, like I have seen bins 10- 17 foot wide and 20-feet long, I've seen them 20- 18 feet wide and 40-feet long. Do you have any 19 sense of the size of these bins? 20 PANELIST: We have some, yes. 21 MR. WEEKS: Can you tell us what 22 that is?

Page 194 202-234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. 1 PANELIST: We're still working on 2 making sure that those figures are accurate. 3 PANELIST: The drawings and so on 4 in the final report. And I think the model 5 that you saw today is also to scale as much as 6 we can, 3D model that's available - 7 MR. WEEKS: Okay. And the - have 8 you calculated a TNT equivalency of the 9 explosion? 10 PANELIST: Yes, we have. 11 MR. WEEKS: And what number is 12 that? 13 PANELIST: We're not at liberty to 14 divulge that right now. 15 PANELIST: That will be part of our 16 final blast reconstruction. It's still 17 ongoing. 18 PANELIST: It's a work in progress. 19 PANELIST: So we should have that. 20 MR. WEEKS: Have you put an 21 estimate on the length of time the ammonium 22 nitrate was in the bin?

Page 195 202-234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. 1 PANELIST: We have some information 2 from the folks that work there on when the 3 material was delivered. As we understand it, 4 there was a high turnover because of the 5 planting season. There was that rail car full 6 of ammonium nitrate. There were farmers that 7 were coming and picking up supplies of 8 ammonium nitrate. There was ammonium nitrate 9 being delivered, so there was a high turnover 10 from what we gather. 11 MR. WEEKS: So, it was turning over 12 in matters of days, would you say that? 13 PANELIST: I think that's a safe 14 assumption. 15 MR. WEEKS: Thank you. 16 PANELIST: You're welcome. 17 DR. HOROWITZ: Very fair questions, 18 and we'll certainly endeavor to answer those 19 and others in the final report. Yes, ma'am? 20 MR. WHITE: My name is Lynn White, 21 and I've been traipsing after David for the 22 last 40 almost years, and learned a lot just

Page 196 202-234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. 1 by observation. But I'm a puzzle worker and I 2 know that you can have thousands of pieces and 3 think you've solved the puzzle and then 4 there's always one that's missing, or somebody 5 did something with it that messes you totally 6 up. So, I've been listening, and if one of the 7 puzzle pieces that I'd like for you to think 8 about, and that goes back to the Planning and 9 Zoning part of it. There's a culture in 10 Planning and Zoning that wasn't mentioned, and 11 it's called developers drive zoning in most 12 cities, in the City of College Station where 13 growth is happening phenomenally. Since it 14 started when I moved there in '72 where 95 15 percent of what's there now was not there 16 then. It's been development-driven. 17 David and I bought a property 18 outside the city limits that had a warehouse 19 on it. Bella Corolli (ph) and Mary Lou 20 Rettling (ph), and one of our gymnastics gyms 21 wanted to make it into a world-class 22 competition gymnastics gym. But it had been

Page 197 202-234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. 1 taken in, annexed by the city without any 2 input to us or from us. We did not know until 3 they came to get this, and we went to the city 4 about what we would have to do to do this, 5 that it was - we are in a zone for heavy 6 industry only. 7 Immediately behind our warehouse 8 is a park that is the runoff control for a 9 subdivision behind it, a residential assisted 10 living facility on this side of us across the 11 street, a retirement complex on this side. 12 This whole street, heavy industry only. 13 Needless to say, we didn't get the 14 gym even after making the investments to meet 15 the code, but we were told on final 16 walkthrough you've met the code, but we have 17 to treat it as heavy industry only. 18 Now, we all had been told you can 19 move commercial into industrial, but not 20 industrial into commercial, and that's the 21 basis on which it was all made. What we have 22 learned is that developers keep areas from

Page 198 202-234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. 1 being developed until they're ready to make 2 their money off of it by getting it zoned as 3 something it can never be used for until 4 they're ready to go with it. 5 So, there's other zones around 6 College Station, you know, so when we talk 7 about Planning and Zoning, I've observed our 8 Commission being guided by local decision 9 makers and by the people that coach them from 10 City Hall, and doing the best job they know 11 how. But somehow they have to be informed 12 about if it's going to be heavy industry only, 13 what does that really mean? If you're going to 14 let them develop along by this fertilizer 15 facility, what does that mean? 16 So, if we have flood control rules 17 and policies with a 100-year flood plain, why 18 not have a rule that says if it's in an 19 industrial zone within a certain distance the 20 developer has to pay this tremendous fee for 21 liability to that area, or some sort of 22 incentive comparable to flood control for

Page 199 202-234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. 1 hazard control in a zone. Just a thought. 2 And on the railroad cars, if you 3 get one of those little code books, you can 4 know by the code on it everything that's 5 driving on down your highway in a truck, and 6 everything that's on the train. That's the 7 living with David. 8 DR. HOROWITZ: Thank you. Yes, sir. 9 MR. HOSTEAD: My name is Kirk 10 Hostead (ph). I hate to pick on Professor 11 Corbett again, but I noticed you mentioned the 12 video cameras, remotely recorded video 13 cameras. To me that just seems like common 14 sense. 15 It seems kind of ridiculous that 16 ammonium nitrate is not classified as an 17 explosive, but either intentionally or even 18 accidentally it can be turned into a high 19 explosive in less than five minutes, just 20 incredibly easily. You would think that 21 somebody would want to monitor that. You know, 22 maybe even an armed guard or two, but security

Page 200 202-234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. 1 cameras, that's pretty cheap, pretty easy. 2 And, of course, you have to record it 3 remotely, otherwise something goes wrong, 4 you've got no video. But if the West 5 Fertilizer Company had had those cameras 6 monitoring that ammonium nitrate a year later 7 we would not be wondering how that fire 8 started. So, that's a really good idea that we 9 should probably talk more about. 10 Also, I hate to pick on City 11 University of New York, but one of your fellow 12 professors, Dr. Mishio Kaku (ph). In the past 13 year there's been a lot of speculation on what 14 actually caused the explosion because, you 15 know, like we've been saying all night, at 16 Bryan, pretty much the same situation, no 17 explosion. 18 And if you Google explaining the 19 physics behind the West blast, you see Dr. 20 Mishio Kaku from City University of New York 21 on CBS This Morning after the explosions. And 22 he was speculating rather convincingly that

Page 201 202-234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. 1 the firefighters could have caused the 2 explosion by spreading water on an anhydrous 3 ammonia leak, that there could have been a 4 chemical reaction between the anhydrous 5 ammonia and the water. And I just want to get 6 your opinion, if you think that there's any 7 possibility whatsoever that that could have 8 contributed to the explosion? 9 PANELIST: Can I respond? 10 DR. HOROWITZ: Sure. 11 PANELIST: Okay. Just real quickly, 12 just a reminder there's about 8,000 faculty at 13 CUNY, so I'm just one of them. 14 DR. HOROWITZ: Well, we expect you 15 to answer for all of them. 16 (Laughter.) 17 PANELIST: Yes, I can't answer for 18 him. I don't agree with that. I don't think 19 that had anything to do with it. I think, you 20 know, we realize that the anhydrous ammonia 21 was a concern, I think, you know, for the 22 firefighters that were there, but I don't

Page 202 202-234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. 1 think that had anything to do with it. I 2 certainly wouldn't agree with that, you know. 3 I disagree with a lot of the faculty all the 4 time, so that's not to endorse that opinion, 5 basically. 6 MR. HOSTEAD: Is there anybody else 7 that has any kind of opinion on that? 8 PANELIST: We've never cited that 9 as a factor. 10 MR. HOSTEAD: Well, it's not even a 11 possibility, because at the time of the 12 explosions the firefighters weren't spraying 13 any water, and the anhydrous tanks weren't 14 leaking any anhydrous ammonia, so that had 15 nothing to do with it. 16 PANELIST: I don't believe so. 17 MR. HOSTEAD: But a year later 18 people that are curious that don't know these 19 kinds of details about what happened still 20 think that the firefighters might have 21 possibly actually caused the explosion. So, 22 it's important that everybody understand that

Page 203 202-234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. 1 that's not true. And when you get back to New 2 York, I'd appreciate if you'd stop by and say 3 hey, Mishio, could you talk to CBS and maybe 4 get that off their website because it's just 5 stupid. It's disrespectful to the firefighters 6 who did everything right. 7 Just one more quick question. 8 Reverend Crowder, there you are, he mentioned 9 that a year later, you know, the firefighters 10 had roughly 20 minutes to make snap decisions, 11 figure out what needs to be done. And Reverend 12 Crowder said that for the most part they did 13 pretty good. 14 They had 20 minutes, you all have 15 had a year. Is there anything that any of you 16 all can think of that they could have done 17 differently, or should have done better? 18 PANELIST: I think if you look at 19 this investigation from the very outset, it's 20 been done with the highest regard for those 21 men that died. It's not an easy task to do 22 what firefighters do. Everybody on this panel,

Page 204 202-234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. 1 everybody on this Board has the highest 2 respect for people that do that work, and the 3 last thing that we would do would be to malign 4 anyone for doing what these men did at the 5 spur of the moment. 6 As I said earlier, they left 7 whatever they were doing. They got a page and 8 they left. They told their families I'm going 9 to respond, I'll see you later, and they never 10 came home. We get that, so any hint that 11 something that we've been part of or that 12 we've put forth in this investigation is 13 really missing the point, there's nothing from 14 day one that we've said that hinted that 15 anyone did anything wrong at that fire. 16 MR. HOSTEAD: Oh, no, no, no, no. 17 And I'm not saying that. Not only did they not 18 do anything wrong, I have yet to find anything 19 they could have done better, or not just them, 20 anybody anywhere. And I really want to know if 21 you think that there's something that anybody 22 could have done better in that situation, it

Page 205 202-234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. 1 would be good to know for future reference, 2 you know, in that situation. 3 They were walking into a bad 4 situation, but they figured out what needed to 5 be done pretty quick. And if anybody, you 6 know, maybe even offline afterwards say, you 7 know, well, maybe they could have tried this, 8 I'd be interested to hear that. 9 I know that lately there's been a 10 lot of speculation, especially around the one- 11 year anniversary that they should have just 12 left. They should have just pulled back 13 immediately and, you know, I don't think that 14 that was an option for them considering the 15 wind was blowing the smoke in the direction of 16 the West Rest Haven, and they knew there were 17 people in there. And if they did just leave 18 and not try to contain the fire, that those 19 anhydrous tanks would have vented and all that 20 anhydrous ammonia would have blown directly 21 towards West Rest Haven. So, I mean, in case 22 anybody was thinking of that, that would have

Page 206 202-234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. 1 been alive if they had of just pulled back, 2 I'm just speculating. I'm not speaking on 3 behalf of any of the firefighters, and for 4 anybody who already knows that I'm the one 5 that put together the PowerPoint on the likely 6 causes of the explosions, I'm not speaking on 7 behalf of any of the firefighters. And the 8 firefighters, none of the firefighters are 9 convinced that the wind or the high-tension 10 power lines contributed to that huge explosion 11 and the smoke. 12 But before you guys go back to 13 D.C., you really need to talk about this. This 14 is on your website. This is a screenshot of 15 the four cell phone videos, and it pretty 16 clearly shows that you haven't analyzed the 17 video correctly. And you haven't collaborated 18 very well with the State Fire Marshal's 19 Office. I was hoping that tonight we'd talk 20 more about what was different between West and 21 Bryan, why other ammonium nitrate fires that 22 weren't contained didn't detonate, and West

Page 207 202-234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. 1 did. And that the explosion that detonated the 2 ammonium nitrate came from outside of the 3 building through the smoke which, obviously, 4 you all haven't looked at that closely. But we 5 can talk more about that later, but that's 6 also important to understand because there was 7 something very unusual about the smoke from 8 that fire that needs to be figured out, what 9 was in that smoke, what it consisted of, what 10 made it so explosive, and how do you prevent 11 that in the future? Because some of these 12 chemicals that existed in that smoke can be 13 combined from other chemical fires. And, you 14 know, we need to know what happened. We need 15 to figure out why that smoke was so explosive. 16 DR. HOROWITZ: Okay, thanks. 17 MR. HOSTEAD: Thanks. 18 DR. HOROWITZ: That's all. Any 19 others? Yes, ma'am. Would you - 20 AUDIENCE MEMBER: I was in a direct 21 line across the tracks and there were cinders 22 with fire in the smoke.

Page 208 202-234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. 1 DR. HOROWITZ: Okay. 2 AUDIENCE MEMBER: And the 3 firefighters did everything could. I have two 4 sons that were over there fighting the fire. 5 If they had not put the water on it that they 6 did, and the way the wind was blowing, that 7 car on the railroad would have exploded, and 8 people within seven miles would have been 9 dead. 10 DR. HOROWITZ: Any others? Yes, 11 sir? 12 MR. YUTTER: My name is Charles 13 Yutter (ph). I'm a lifelong West resident, and 14 I do believe - I believe the smoke did do it. 15 I think that what happened is that when the 16 carbon, like the State Fire Marshal was 17 saying, from the - you got the different 18 things that were burning, such as the shingles 19 and stuff, and you can get - when you get a 20 smoke mixture it can support an arc causing 21 phase to ground, or phase to phase faults. 22 This is off the internet, Transmission and

Page 209 202-234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. 1 Distribution (inaudible) November 1, 2000. 2 And more than likely when it went 3 through those transmission lines, it 4 discharged across there. One of those lines, 5 if I remember, I live five miles southeast of 6 town, but when I came to town and went to the 7 Rest Home to get people out, and if I remember 8 correctly, there was one of those high-power 9 voltage lines which were put there in the 10 early 1900s, I believe before 1910. I think 11 one of them was down by the football field, if 12 I'm not mistaken. But I believe that's where 13 it was down, and it probably discharged 14 further down by the smoke, and then that was 15 the weak link. And probably that's what caused 16

17 know. But I believe, until I'm convinced 18 otherwise, and I got to spoke to Mr. Mates 19 (ph) about that, and the lady here, Ms. 20 Rosenberg, I believe, earlier. And I 21 personally believe that's what caused the 22 explosion itself.

Page 210 202-234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. 1 DR. HOROWITZ: Thank you. 2 AUDIENCE MEMBER: That was the 3 first explosion. 4 DR. HOROWITZ: I think that - 5 MR. YUTTER: I'm talking explosion 6 as far as the big blast, because that's when 7 the smoke was - the smoke was blowing from 8 the southeast, and I live southeast of town, 9 but the smoke was blowing - I mean, the wind 10 was blowing heavy that night from the 11 southeast to the northwest, which would have 12 put it right through those transmission lines 13 on Reagan Street that were built in the early, 14 early 1900s. 15 DR. HOROWITZ: Thank you. I think 16 that's it, Mr. Chairman. 17 CHAIRPERSON MOURE-ERASO: Thank you 18 very much. So, I would like to give the floor 19 to Mr. Banks about the next steps on the 20 investigation. 21 MR. BANKS: Okay. I know it's been 22 a long evening, so I promise we're winding

Page 211 202-234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. 1 down. 2 As a path forward for the balance 3 of this investigation, the team will be 4 looking at AN explosion blast modeling and 5 impact analysis. We'll be doing some - 6 conducting some laboratory testing of AN. 7 We'll be performing an analysis of fire code, 8 and I think the information that we've 9 gathered here tonight will be very helpful for 10 us moving forward. 11 Obviously, there will be a 12 regulatory analysis to consider applicability 13 of regulations that are in place now and maybe 14 the implementation of new ones. We'll develop 15 recommendations, and that's part of our 16 process. We have one of our recommendation 17 specialists here tonight with us, Ms. Morgan. 18 And those are really the - really touchstone 19 to our process is recommendations that are 20 logically connected to a root cause. 21 Then, finally, we'll develop a 22 full report. And we hope to get that completed

Page 212 202-234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. 1 by year's end with any luck, and not any other 2 major events happening. And then we'll have a 3 final public meeting. We owe that to the 4 community to come back and give them their - 5 the final assessment of what happened. And at 6 that time with your recommendations, submit 7 that to the Board for their consideration and 8 vote. I hope they will find that it passes 9 muster and will vote to accept it. But that 10 will also be an opportunity for the public to 11 come forward and give us input, as well, at 12 that time. 13 Before I move off, I want to thank 14 Mayor Muska for your graciousness throughout, 15 to the community of West for your 16 graciousness, your accepting us as we came to 17 do our task under very trying conditions. And 18 I want to also thank you for your presence 19 here tonight. To our panel, I want to thank 20 you for your contribution to our collective 21 efforts. There's a wealth of information that 22 we gathered here tonight that we would not

Page 213 202-234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. 1 have gathered had you not taken time from your 2 busy schedules to come and participate with 3 us, so I thank you. Mr. Chairman. 4 CHAIRPERSON MOURE-ERASO: Thank you 5 very much, Mr. Banks. So, as closing remarks, 6 I will say that thank you for your attendance 7 at this public meeting today. This has been a 8 very insightful and stimulating day for all of 9 us, and especially I thank the team for their 10 dedication to this project. 11 I also want to thank each of the 12 Board Members for their comments here today. 13 All of us share a strong interest in 14 preventing these type of explosions in the 15 future, and we'll all be working together now 16 with the staff to see that important 17 recommendations that are developed for these 18 investigations are put into place and we'll 19 act on them. 20 I also would like to thank all of 21 you that were here, especially the panel 22 members that addressed us, and also the

Page 214 202-234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. 1 members of the audience for their 2 participation, and also for their long range 3 of attention that they have to have for this 4 very extensive meeting. So, thank you very 5 much and this meeting is adjourned. 6 (MEETING ADJOURNED.) 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22

202-234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. 202-234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. Page 215 A $100 138:5 $5 192:12 abandon 66:7 abatement 18:18 Abbott 27:4 ability 10:15 175:5 175:6,9 able 25:6 55:1 72:17 77:17 79:18 90:21 109:19 134:20 182:21 ABS 107:1 absence 18:17 absolutely 135:4 155:22 absorb 131:5 academic 164:8 accept 186:18 212:9 acceptable 121:18 accepting 212:16 access 22:4 139:13 accident 5:18 37:2 38:14 39:3,9 42:15 accidental 109:12 accidentally 199:18 accidents 5:7,16 106:7 115:2 accomplished 139:21 account 35:16 36:11 96:1 133:6 accounts 35:14 accurate 194:2 acquire 136:10 144:2 acquisition 136:9 act 38:11 213:19 action 69:16 89:19 105:18 115:10 150:7 178:19 actions 5:10 6:13 26:14 29:7 46:10 59:21 60:2 82:14 89:9 active 10:21 73:5 activities 14:6 16:16 116:12 117:21 130:16 activity 128:11 175:5 acts 59:2 actual 54:12 130:17 acute 41:5 add 85:22 98:9 178:4 addition 17:17 18:1 19:14 30:5,14 31:3 96:8 167:18 174:12 additional 104:1 145:21 171:18 Additionally 30:11 address 38:9 60:7 75:7 128:14 150:15 157:4 162:1 166:5 167:13 169:18 addressed 59:17 61:8 132:1 167:8 213:22 addresses 123:2 addressing 16:20 133:10 adequate 34:16 adjacent 25:1 102:10 114:20 150:3 adjourned 214:5,6 adjustment 127:19 Adjustments 124:1 administer 150:19 administered 40:17 administration 47:17 151:8 170:3 adopt 29:18 102:7 102:11,18 113:1 114:18,22 115:1,7 118:19 145:18 148:9 150:19 169:17 186:9,9 adoptable 126:2 adopted 17:11 112:20 113:20 115:8,16 118:16 118:21 166:21 adopting 119:10 123:20 149:12 150:4 170:5 adoption 114:8 119:20 123:7 125:11 126:6 144:8 145:3 150:22 151:2,5 advanced 58:13,14 58:16 advances 119:19 advantage 168:12 advice 67:22 164:17 Advisory 63:7,17 67:2,19,21 68:3 68:10,10 69:1,13 affect 26:14 affiliate 75:10 afford 91:13 affordability 119:18 affordable 119:10 Afghanistan 174:19 after-the-fact 134:11 aftermath 18:22 25:4 Ag 143:12 agencies 16:19 44:8 140:11 143:10 agency 5:5 16:12 38:18 173:11 agenda 14:15 56:14 agent 97:9 ago 7:6 118:5 130:10 131:6,8,18 132:11 160:21 183:16 187:12 agree 164:6 187:17 201:18 202:2 agreed 142:17 agricultural 43:6,8 agriculture 124:20 ahead 11:18 38:3 93:2 171:19 aid 18:1 Alamo 183:8 alert 37:16,19 80:21,21 alive 206:1 allow 65:22 66:3 91:18 102:7 144:22 allowed 18:17 86:13 102:19 103:6 114:22 137:3 allowing 25:7 62:16 100:6 allows 157:14 alternative 89:15 89:16 91:14 101:10 alternatives 100:14 aluminum 28:13 ambiguity 83:13 ambiguous 80:8 amendments 169:17 America 100:18 American 117:2 126:19 ammonia 21:4 25:19 39:12 41:7 41:8 42:6 109:12 201:3,5,20 202:14 205:20 ammonium 8:20 20:15 21:8 22:1 23:12 24:11,15 25:20,21 26:2,16 27:13,14 28:1,4 28:12,17,21 29:4 32:7,8,14,16 33:2 33:4,12,16 34:2 34:11 36:16 39:13 41:15,16 42:7 43:21 45:12 46:2 46:8 63:8,12,13 64:13,14 65:4 66:8 67:19 68:13 68:15,21 69:2,5 69:14,22 77:10 80:16 83:5,18 85:9,10 86:9,21 87:2,12 88:8,14 92:3 101:2,5,6 111:10,17 112:3,4 113:4,9,17,21 115:21 122:13,18 133:22 138:18 139:2,15 140:14 141:12 142:21 144:13,19 153:7 153:18,22 154:6 154:15 155:6 160:3 162:19 166:3 177:3,13 178:18 181:16 185:19 187:22 188:1 189:13 190:17,20 191:5 191:10,14 194:21 195:6,8,8 199:16 200:6 206:21 207:2 amount 68:20 69:5 107:5,12 135:8 amounts 44:5 45:12 86:11 AMY 2:12 analysis 158:4 186:16 211:5,7,12 analyze 55:13 analyzed 206:16 analyzing 52:16 106:22 and/or 122:4,13 angst 90:10 anhydrous 21:4 25:19 28:17 39:12 41:7 42:6 109:12 201:2,4,20 202:13 202:14 205:19,20

202-234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. Page 216 animal 92:1 annex 58:4 annexed 197:1 annexes 57:16,18 57:20 anniversary 205:11 answer 14:22 15:8 73:11 75:1 92:10 92:11 93:5 103:13 152:5 163:8 195:18 201:15,17 answered 88:2 answering 82:22 answers 85:15,17 anther 87:5 Anti-Terrorism 111:15 anticipated 131:18 antiquated 63:15 Antoine 6:21 anybody 98:11 188:12 202:6 204:20,21 205:5 205:22 206:4 APA 127:4,6,22 131:20 APA's 117:6 apartment 19:3 105:17 106:13 108:6,11 110:12 111:5 APIE 55:12 apparatus 76:8 78:9 96:19 apparently 64:4 appears 64:9 65:17 66:6 Appendix 63:4 applaud 181:17 Applause 98:7 104:7 170:21 176:15 178:9 180:2 192:16 applicability 133:18 211:12 applicable 122:17 129:1 applied 38:9 43:5 43:12 64:18 71:16 applies 186:20 apply 43:20 61:1 113:9,14 134:18 158:17 178:20 appreciate 62:10 73:11 98:3 102:4 103:1 152:2 171:1 176:11 181:9 188:10 203:2 appreciates 97:21 appreciation 10:9 143:1 appreciative 4:8 approach 55:12 57:11,13 129:12 131:11 165:19 167:11 168:3 approaches 89:5 137:2 appropriate 30:9 32:19 135:13,15 187:18 appropriately 179:2 approval 132:18 approved 178:16 approximately 35:11,18 April 1:7 6:9 12:8 13:9 17:14 27:21 28:2 38:5 40:2 44:12 62:17 138:11 142:6 172:7 176:5 arborists 161:3,10 arc 208:20 area 34:9 37:18 49:18 52:18 53:2 54:22 58:22 61:3 64:13,21 65:16 66:21 68:20 95:2 106:18 110:22 135:21 137:21 139:16 140:3,5 143:20 154:21 157:15 165:1 177:16 198:21 areas 15:15 90:18 90:19 94:22 95:1 95:9,9 97:2 102:14 111:4,11 111:20 124:10,20 125:2 147:6 159:12 197:22 Arkansas 116:21 armed 199:22 arrange 177:21 arrive 22:7 arrived 22:10 ascertain 139:1,14 140:7 asked 164:22 182:19 asking 155:8 aspect 145:3 171:8 181:10 aspects 5:10 132:14 150:15 asphalt 18:16 24:18 assess 88:18 179:6 assessment 31:11 97:7 158:3,13 179:9 212:5 assign 112:18 assigns 112:15 assist 30:8 55:18 assistance 109:17 Assistant 47:16 48:12 117:3 assisted 197:9 Associate 48:5 associated 141:13 151:4 174:6 association 29:10 31:1 35:10 47:11 47:15 49:2 50:16 51:21 53:18 117:3 118:8 126:19 143:12 assumption 195:14 assure 11:2 ATF 63:9 67:2,17 89:7 Atlanta 127:12 172:9 attack 19:7,22 65:4 69:14 attacking 65:13 attempt 22:4,15 128:14 attempted 64:1,2 attempts 29:19 128:4 attend 127:13 attendance 213:6 attendees 15:11 attending 16:17 attention 78:7 186:17 214:3 attractive 110:22 attributed 19:5 audience 137:10 207:20 208:2 210:2 214:1 audio 2:17 August 67:18 Austin 145:12 authorities 39:10 authority 50:1 112:16,18 115:17 150:19 170:6,13 authorized 121:10 available 17:8 91:16 96:14 99:7 164:19 194:6 avoid 183:15 185:2 avoiding 156:20 awaiting 25:1 aware 7:10 20:2 28:16,20 awareness 28:22 31:4,7 54:14 140:21 169:5 B back 5:22 45:22 51:9 55:9,16 57:9 61:11 70:4 71:9 84:18 86:13 88:17 89:3 92:22 93:2 99:10 102:20 104:14 105:6 115:13 134:11,17 136:22 196:8 203:1 205:12 206:1,12 212:4 bad 205:3 bags 91:6 balance 94:18 101:19 139:18 169:12 211:2 ball 90:15 134:16 Banks 2:8 7:14,20 7:22 12:20 13:2 14:9 27:1 44:14 44:16 46:21 47:7 51:12 56:9 62:11 62:14 85:21 86:2 97:18 104:18,21 104:22 105:5 116:2,6 117:17 210:19,21 213:5 Baptist 178:11 barn 156:21 barriers 156:5 Barron 47:3,8 48:20,21 75:1 77:1 78:1 93:9 96:6,7 baseball 110:6 based 5:6,15 16:22 24:14 43:10 50:15 50:18,22 55:12 87:21 93:1 121:16 181:16 BASF 20:17 basic 57:19 58:12 60:11 162:9 basically 77:7 80:19 82:17 134:22 137:3 139:4 157:9 167:15 202:5 basis 76:11,16 197:21 basket 91:22

202-234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. Page 217 bat 90:16 beads 23:18 bedtime 131:10 began 18:3 88:3 107:2 109:10,13 behalf 48:22 51:17 118:2 126:18 206:3,7 behaves 86:21 behavior 33:16 behaviors 181:2 believe 46:14 56:15 59:11,13 69:17 91:8 147:11 202:16 208:14,14 209:10,12,17,20 209:21 believed 43:3 59:18 believer 140:9 142:13 Bell 115:18 Bella 196:19 belong 186:7 belts 24:10 26:1 bench 83:21 benefit 119:19 161:8 berm 192:1,6 best 50:8 70:3 71:2 87:21 119:7 128:4 132:12 140:22 141:12 152:17 153:11 163:3 169:22 182:19 190:10 193:1,5 198:10 Beth 1:19 4:17 14:10 better 145:19 161:5 168:17 169:6 192:14 203:17 204:19,22 beyond 54:14 59:8 101:2 141:8 162:10 bible 54:18 big 140:9 150:21 154:12 178:21 189:15 210:6 bin 23:15,16 92:3 153:10,18,22 154:1 193:4 194:22 binder 78:8 bins 18:15 24:1,9 24:16 25:9 26:6 91:5 173:3 193:11 193:16,19 bipolar 83:9 bit 70:17 108:13 127:3 128:13 142:18 144:12 149:20 157:3 165:16 black 154:5 blase 8:17 blast 8:14 19:20 106:19,20,22 107:11 108:7 135:19 152:19 192:5,5 194:16 200:19 210:6 211:4 blasting 28:12 blaze 95:15 blended 26:10 43:21 blending 24:10 26:5 44:5 blends 24:3 25:18 blew 182:9 191:6 blowing 205:15 208:6 210:7,9,10 blown 205:20 board 1:1,13,16,18 1:20 2:18 3:12 4:5,16,16,20 6:10 6:15 7:3 8:4,6 9:7 11:13,19 13:3,3 14:22 15:8,12 44:18,20 45:5 48:19 62:14 70:11 75:9 80:17 117:18 118:2 124:1 126:17 137:8 146:12 147:22 148:3 155:16 171:4 173:9 178:14 187:10,18 187:20 188:14 204:1 212:7 213:12 boards 127:18 159:3,14 bodies 100:1 body 124:4 boggling 182:15 bolts 149:6 bomb 174:19 book 55:4 books 199:3 bought 196:17 boundaries 124:11 162:19 box 164:5 Brazoria 115:6,9 break 64:12 Bridges 6:16 brief 6:14 15:1 47:8 48:18 117:15 141:20 briefed 144:7 briefing 144:7 briefly 14:16 17:5 66:15 76:9 144:6 bring 52:14 79:19 88:7 148:22 160:16 161:11,19 171:1 bringing 84:4,4 163:2,11 brings 61:18 167:5 broader 128:11 155:9 broken 58:2 brought 73:1 78:6 88:2 180:19 181:7 Brown 68:17 Bruce 116:8 117:20 123:13 Bryan 21:9,22 22:7 22:21 23:7 69:20 86:5,7 87:14 191:8 200:16 206:21 Buck 6:21 budgets 53:12,13 buffer 135:21 build 61:5 101:12 109:14 163:14 building 18:5 23:22 24:17,17,21 25:6 25:7,16 26:5,7 69:7 88:16 91:5 91:20 92:6 108:8 118:8,11 119:17 121:7 147:12 150:14 153:21 156:3 166:9,20,22 167:9 172:3,4 189:9,13 191:4,5 191:10 193:9 207:3 building's 91:3 buildings 109:15 110:17 118:12,13 120:3,9,17,22 121:3,5 122:10 123:1,17 125:10 136:18 166:12 builds 60:19 built 61:2 108:17 119:7,8 150:16 154:3 167:9 170:8 185:14 210:13 bunch 191:7 Bureau 192:9 buried 85:10 burn 22:15 27:14 55:10 65:22 66:4 68:6 70:5 86:14 burned 18:12 21:15 burning 22:2 64:16 66:8 191:15 208:18 BURNS 70:9 business 60:3,4 108:18 109:10 141:10 143:18 144:3 172:11,13 188:17 businesses 19:11 36:14 143:14 144:18 145:1,4 busy 213:2 buy 72:19 byproducts 66:17 C C 2:7 4:1 CAD 61:16 cake 85:10 calculated 194:8 calculations 159:9 call 4:12 7:22 10:2 17:17 22:8,11 37:22 49:20 55:12 60:15 75:18 88:2 96:4 116:9 127:21 128:1 179:17 called 21:11 130:7 131:8,20 132:11 160:22 188:17 196:11 calls 17:16 51:2,3 Calvin 6:17 cameras 91:12 199:12,13 200:1,5 Canada 31:18 52:2 55:20 75:18 canopy 161:6 capabilities 53:10 159:14 capability 55:5 156:1 159:6 capacity 146:4 Captain 27:7 captured 18:10 captures 121:20 car 24:22 54:11 182:5,10,14 195:5 208:7 carbon 154:5 208:16 care 19:12 25:20

202-234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. Page 218 192:13 career 34:21 35:3,4 35:13 36:5,6 53:20 75:14 79:2 carefully 176:19 carloads 32:10 carry 144:19 179:19 carrying 20:20 162:21 cars 37:13 182:6,7 182:13 183:22 184:1,7,10,11 199:2 case 10:19 22:2 23:7 55:3 82:16 82:17 100:3 106:8 135:6,17 174:16 205:21 cases 34:5 84:16 154:14 156:20 160:7 174:17 catastrophic 20:15 82:18 categories 13:17 40:22 81:20 category 81:3 cause 9:4 41:4 121:17 211:20 caused 20:19 106:12 200:14 201:1 202:21 209:15,16,21 causes 5:11 17:2 206:6 causing 208:20 caved 107:22 CBS 200:21 203:3 ceiling 107:22 cell 6:4 206:15 center 108:7 117:7 127:21 128:18 154:11 Centers 128:1 cents 177:12 192:11 century 20:16 131:22 CEO 118:3 certain 30:21 41:2 74:20,21 75:4 76:11 102:8 159:19 162:9 198:19 certainly 49:4 50:10 51:6 79:13 80:1 126:20,20 136:2 137:9 138:2 139:16 145:6 146:14 158:9 187:16 195:18 202:2 certification 35:2,4 35:7 49:5 50:2,12 50:14,15,18,21 75:8,11 certified 189:11 cetera 73:8 136:13 181:4 CF 33:1 34:1 CFEI 2:8 Chair 44:17 48:8 137:8 168:6 171:21 chairing 73:7 Chairman 8:9 9:14 11:7,12,19 12:12 12:17 13:2 62:14 98:8 117:18 149:19 167:18 178:14 181:7 187:10 210:16 213:3 Chairperson 1:15 4:3,15 6:22 9:11 11:8,14,17 12:18 44:19 45:5,9 46:4 46:12,19 47:5 70:10 82:7 85:19 89:2 93:7 96:5 97:11 98:4,10 99:17 100:8 103:2 103:19,22 104:4,8 104:16 126:14 148:2,6 149:15 151:20 167:19 168:11 169:1 170:16,22 176:13 176:16 178:3 185:15 210:17 213:4 challenge 140:20 141:3 156:6 169:21 chance 130:3 change 9:4 12:9 100:4 132:20 134:15 142:3 146:22 150:7 155:3,20 168:19 181:1 186:18 changed 11:2 59:12 180:8 changes 9:8,21 134:16 147:19 changing 30:20 145:15 channel 96:20 Chapman 6:17 chapter 120:20,22 121:1,8,20 122:3 122:6,14,19 Chapters 122:1 characteristics 23:12 129:10 charge 7:14 12:21 85:21 104:19 charged 42:1 141:16 charges 146:16 Charles 208:12 Charlie 180:11 chat 51:16 cheap 91:12 200:1 cheapest 192:1 chemical 1:1,13,16 1:17,20 2:18 4:5 4:15,20 5:7,10 9:7 12:4 16:21 21:12 36:14 37:2 38:14 39:3,8,13 40:10 40:11 41:1,12 42:15 43:16 55:2 63:6 67:18 69:1 80:9 81:2 83:22 96:15 111:15 126:17 134:1 142:22 171:4 173:8 176:8 184:22 185:9 186:3,12 201:4 207:13 chemicals 8:22 24:2,6 25:14,17 26:2 39:5 40:21 41:4,14,19 44:1 45:13 108:21 186:11 207:12 chemist 85:14 chemistry 76:2 77:19 Chief 48:12 chiefs 141:21 choice 13:18 choose 118:19 186:8,12 187:1 chooses 165:9 chop 177:17 Chris 47:3 117:8 137:10 Church 178:11 cinders 207:21 circumstances 87:3 178:2 cited 202:8 cities 103:9 118:18 156:1 175:14 196:12 citing 8:21 citizen 182:12 184:6 citizens 11:22 124:7 127:2 139:13 city 11:13,20 12:6 12:16 20:21 28:5 28:6,9 42:3 48:3,7 49:3 56:13 72:4 72:12 80:20 84:13 105:22 106:8,17 108:15,16 109:13 110:7 111:12 113:14 136:3 137:18 139:19 148:15 172:16 174:17 175:3,6,22 176:2 181:3 184:8 196:12,18 197:1,3 198:10 200:10,20 city's 113:12 civil 60:1,2 claimed 20:18 21:2 clarification 179:10 180:4 class 99:1,5 classification 26:8 classified 20:8 26:13 199:16 classify 26:9 clear 132:8 179:15 clearly 9:22 27:16 33:13,18,20 34:6 135:22 161:4 206:16 close 10:7 50:14 106:1 108:15 109:15 110:18 136:17 137:4 closely 133:1 207:4 closer 135:11,11 176:7 closest 111:4 closing 3:20 213:5 cloud 28:18 130:2 coach 198:9 coast 96:21 115:5 coat 54:19 coated 20:20 28:4 coating 177:13 code 17:12 63:5,6 63:10,18 69:13 80:18 83:6,12 113:12 114:5,8,10 114:19,22 115:2,7 115:8,16 116:13

202-234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. Page 219 116:14,19 118:1 118:13,16,21 119:15,20,22 120:1,14 121:7,9 121:19 122:3,22 123:6,12,14,20,21 124:18 125:5,12 125:17,19 126:1,8 139:4,14 144:10 144:13 145:3,11 145:18 148:9,12 148:12,13,14,17 148:18,18 149:12 149:16 150:4,11 150:12,14,14,17 150:20 151:3,11 151:14 153:11 156:3,3 157:9,22 158:6,8,10,12,17 158:21 161:21 162:8,10 166:7,11 166:13,16,18,19 166:21 167:6 168:3,12,17 169:7 169:17 170:1,5,11 172:2,3,3,4 175:16,18 186:1,9 197:15,16 199:3,4 211:7 codes 9:1 29:14,17 63:14 102:7,11,13 102:18 103:4,7 112:20 113:1,8 114:3 115:12 118:11,19,20,20 119:4,12,13 137:1 148:11 150:12,15 151:9,18 157:2,21 158:11 166:1 167:2 Cody 6:17 COHEN 2:9 collaborated 206:17 collapsed 154:10 collapses 154:8 colleague 26:20 36:18 123:4 collected 16:2 collecting 106:21 collective 19:17 212:20 College 48:6 191:9 196:12 198:6 colleges 164:9 Colorado 14:3 Columbia 119:1 combine 138:19 combined 107:11 207:13 combustible 153:9 153:20 154:16,22 183:5,14 185:12 combustibles 18:14 153:19 155:6 combustion 66:18 come 14:21 47:3 56:1 58:22 59:7 59:10 78:13 87:11 89:3 94:5,10,12 97:22 100:22 101:10 116:3,9 134:4 144:4 152:9 152:11 155:4 163:10 168:21 172:1,10 174:7 190:11 192:22 212:4,11 213:2 comes 60:19 80:19 82:1 93:20,20 98:15 166:11 comfortable 95:6 coming 4:8 71:19 78:1 184:17 188:22 195:7 commander 30:9 96:2 commanders 31:6 commenced 23:1 commended 115:9 comment 3:18 15:10 89:22 171:5 171:14,18 176:16 185:15 188:5 comments 15:12 70:7 104:1 123:5 171:8,11 176:17 180:16 183:17 213:12 commerce 17:4 182:17 commercial 111:19 118:12 124:20,21 125:5,6 157:11,11 172:19 197:19,20 commercial/indu... 124:14 Commission 70:14 123:22 124:3,6,10 148:20,21 149:8 163:11 198:8 Commissioner 117:10 commissioners 127:17 commissions 10:21 127:18 committed 141:5 146:18 committee 16:13 41:22,22 56:17 73:8 138:11 140:19 143:3 commodity 71:18 95:10 common 199:13 communicated 33:13 communication 132:21 162:4,5 Communications 2:9 31:19 communities 10:8 11:2 23:10 37:4 38:7,14 39:20 42:14 51:9 66:10 113:3 127:1 128:3 131:15 151:16 162:11 164:18,20 165:5 166:6 173:15 community 6:13 9:19 10:1,8,17,18 13:11 14:21 16:3 19:3,10,13,17 38:11 41:5 51:1 51:19 53:3 55:8 55:19 57:15 60:14 67:16 68:9 73:6 79:3,6 86:16 95:7 96:14 97:21 105:20 107:3,7 109:1 110:3,20 111:8 114:12 117:20 118:4 124:15 126:9,18 127:8,16 128:3,7 129:11,17,21 130:3 133:3,7,11 138:1 140:2 143:21 145:20 148:8 151:6 157:5 157:15 159:21,22 160:9,11 161:5,8 162:13 163:1 164:8 166:7 172:21 179:22 212:4,15 community's 109:10,19 companies 18:1 39:2,7,19 43:20 73:19 185:1,9 companion 150:13 company 21:12 40:20 41:11,18 42:10 45:18 62:18 200:5 comparable 198:22 compared 32:22 comparison 21:20 85:22 compatible 125:2 compel 187:4 competence 31:2 competencies 31:4 31:5 competition 196:22 completed 139:6 140:17 141:4 211:22 completely 87:4 187:17 complex 19:4 105:17 106:14 108:6,12 110:12 111:5 159:8 197:11 compliance 121:12 121:16 155:5 complicated 151:16 compliment 39:2 comply 121:5 component 174:19 components 124:13 comprehensive 42:12,21 124:4,9 124:11,19 133:9 149:1,9 167:11 172:21 comprehensively 167:8 conceive 89:12 concentrate 69:18 174:4 concern 109:7,11 113:16 153:6 163:9 201:21 concerned 112:2 119:6 187:18 concerning 105:18 108:2 113:1 concerns 138:21 139:18 167:14 175:2 conclude 106:4 133:16 concludes 126:12 conclusion 66:11 concrete 101:13 173:3 conditions 20:12 22:2 27:14 33:17 68:12 85:3 120:9

202-234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. Page 220 132:1 134:12,17 135:1 212:17 condolences 8:9 9:15 49:2 51:18 62:20 118:3 conduct 77:9 186:2 conducted 15:21 16:2 21:18 53:16 53:17 84:7 conducting 211:6 conference 127:12 configured 25:8 confine 63:1 confinement 66:17 confront 162:17 confusing 63:16 80:7 congratulate 178:6 Congress 38:12 Connealy 117:9,9 137:7,10 150:5 152:1,11 155:22 156:12,15,19 167:22 168:6,13 168:16 connected 211:20 consensus 29:14 169:11 consensus-based 119:15 Consent 15:20 consequences 19:15 82:17,18 105:13 106:2,9 109:8 conservation 118:9 consider 9:5 20:5 68:5 108:2 124:10 128:5 211:12 consideration 15:12 23:3 124:16 212:7 considerations 128:15 considered 89:20 168:2 considering 170:14 205:14 considers 119:16 consisted 207:9 consistent 64:10 120:5 consistently 151:15 consists 14:9 41:3 consolidated 122:5 constantly 139:18 153:3 construct 118:11 constructed 17:7 24:17 25:16 114:2 construction 23:2 69:6,8 78:15 91:5 114:16 119:11 120:21 121:4 154:22 166:7,16 166:18 consult 31:22 consultation 139:3 consultations 140:17 consulting 107:1 191:21 consumed 154:7 contact 140:3 185:16 contacted 140:5 contain 64:2 65:10 182:8 205:18 contained 106:18 206:22 container 18:15 containing 8:22 28:3,12 32:8 33:8 contains 120:20 122:7 182:13 contamination 87:9 CONTENTS 3:4 context 30:20 63:3 129:6 continually 154:2 continue 8:1 50:20 104:10,20 140:19 continued 110:20 125:13,14 continues 140:1 continuing 14:14 contours 130:18 Contracting 2:12 contradictory 63:15 65:20 84:11 contribute 97:22 contributed 8:19 18:20 201:8 206:10 contributing 16:18 contribution 212:20 contributors 14:3 control 68:14 95:18 197:8 198:16,22 199:1 controllable 65:15 93:13 controlled 154:14 controlling 120:15 123:16 conversation 149:20 conveyor 24:10 26:1 convinced 206:9 209:17 convincingly 200:22 cool 64:15 cooling 21:18 coordinate 166:2 coordinated 167:3 coordination 162:4 162:6 Coordinator 48:2 56:13 copious 86:11 copy 88:14 Corbett 47:4 48:5,5 62:12,13 76:9,21 78:21 80:6,11,15 82:8 83:3,4 86:19 87:7 89:4 90:7,8 99:20 178:16 180:5 199:11 core 14:8 60:11 172:12 corner 193:8 Corolli 196:19 corporate 176:2 correct 73:9 74:10 correction 121:18 correctly 206:17 209:8 cost 151:4 169:9 177:12,14 Council 116:13,14 116:19 118:1 123:12 144:10 148:16 counsel 2:7 4:20 count 182:5 counties 18:2 72:15 102:7,17 103:9,11 112:19 114:18,19 114:20 115:1,12 118:19 139:9 141:1 144:17 145:16 170:12 country 12:3 34:20 73:4 75:18 76:18 90:19 102:14 103:12 111:11,16 176:6 county 42:4,5,8,20 43:1,11 48:3 56:14,21 58:13 70:18 71:19 72:7 72:15 79:1 102:5 102:9,10 109:18 112:21 114:21 115:6,7,9,14,18 142:3 150:1,3 152:17 countywide 140:21 couple 160:20 192:20 course 17:1 65:10 69:16 97:8 151:2 200:2 courtesy 176:3 covered 24:18 38:20 39:14 114:1 covers 39:5 cow 156:21 create 124:3 125:1 139:11 169:6 created 67:2 166:20 creates 113:13 creating 126:22 credit 142:16 crew 31:13 Criminal 48:7 criteria 29:22 41:10,15 125:18 critical 134:14 135:4 136:5 crops 109:2 crossing 183:21 Crowder 178:11,12 178:13 180:4,15 180:19 183:18 203:8,12 cryogenic 122:16 CSB 4:5 5:4 6:6 7:20 13:22 14:16 15:20 23:4 32:22 36:9,22 40:1 82:21 105:13 107:1,17 109:18 111:21 115:4,11 117:18 137:8 140:12 171:10 188:8 Csb's 3:9 36:19 105:11 culture 196:9 CUNY 201:13 curious 70:14 181:17 184:22 185:8 202:18 current 27:17 31:15 32:16 33:5 134:18 155:13 currently 47:8,9 71:13 116:11 117:5 118:21

202-234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. Page 221 121:5 139:7 custom 24:2,10 25:18 26:5 customer 43:10 140:6 customization 162:14 Cyrus 6:19 D D 4:1 D.C 5:6 14:1 206:13 Dallas 27:7 damage 13:12 16:4 16:7 19:11 106:12 107:13,15,19,21 108:1,5 138:6 152:22 damaged 108:9 danger 67:14 145:7 182:22 dangerous 32:1 120:8 125:14,17 188:20 Daniel 2:6 171:3 data 30:8 33:7 86:8 106:22 111:13 119:17 database 140:8 databases 138:20 date 69:8 105:12 126:6 daunting 145:13 David 188:5,6 193:2 195:21 196:17 199:7 day 25:8,10 37:6 79:15 96:22 174:10 188:19 191:13 204:14 213:8 days 20:4 53:12 107:17 127:11 195:12 de 167:4 172:8 dead 208:9 deadly 34:15 deal 89:17 91:9 129:5 157:16 161:17 166:19 dealing 36:15 63:11 67:19 92:2 93:12 128:2,10 129:3 deals 122:14 134:7 157:6 dealt 132:13 death 141:16 deaths 20:3 27:19 98:19 December 139:22 141:6 deciding 144:18 decimated 108:8 decision 22:14 30:6 38:3 64:7 93:13 198:8 decisions 17:10 30:20 32:13 34:18 87:20,20 88:19 96:9 144:21 203:10 decomposing 18:20 decomposition 66:22 decontamination 87:9 dedicate 126:22 dedicated 118:8 dedication 213:10 deed 136:12 deep 57:1 defensive 55:6,17 94:14 95:11 179:17 deficiencies 59:16 deficient 63:15 defined 33:20 34:6 41:12 172:6 definitely 76:3 173:4 definition 93:18 definitive 67:22 deformation 107:19 degree 121:1 deliberate 142:17 deliver 56:1 185:13 delivered 24:8,9 25:21 183:12 195:3,9 demands 51:1 demonstrated 178:5 demonstrates 21:22 Denton 2:10 14:10 105:3,4,5 116:6 147:21 Denver 14:2 department 17:22 27:4,5,6,8,9 28:10 29:13 31:17 40:18 41:20 42:7 48:9 48:13 49:14,17 53:1,10,11,16 55:5 58:21 64:1 65:5 72:5 76:5 77:16 78:2,10,11 111:14 112:8 117:11,22 123:11 129:7 140:4,12 142:7 175:22 departments 30:2 34:20,22 35:20 36:1,4,5,6,8,11,12 49:7,9,10 50:3,4 50:11,20 51:2,8 61:17 74:19 77:9 77:12 79:1,8 142:7 176:6 189:21 depend 95:12 96:17 97:6 depends 143:21 depicts 111:1 deployment 14:6 depth 160:2 163:13 Deputy 117:10 138:22 describe 14:17 describing 82:9,15 141:10 description 17:14 23:13 design 5:11 120:16 123:16 designating 125:1 designed 5:16 125:18 designing 125:4 desired 140:2 desk 116:10 despite 20:8 36:9 destroyed 16:10 106:19 destruction 47:18 106:13 111:2 detail 38:21 132:6 133:14 141:12 142:5 detailed 131:11 details 202:19 detected 68:17 determine 106:6 125:16 159:9,10 182:21 determined 143:3 determining 34:8 77:21 detonate 27:15 37:10 84:21 85:1 206:22 detonated 207:1 detonation 184:4 devastated 9:22 devastating 9:18 devastation 111:7 develop 17:2 30:14 36:13 39:8 42:12 42:20 72:12 102:21 107:1 110:22 140:8 198:14 211:14,21 developed 16:22 63:14 72:10 93:1 98:22 111:21 118:20 128:22 131:2,7 198:1 213:17 developer 198:20 developers 196:11 197:22 developing 29:11 30:9 42:1 102:3 110:4 124:8 142:14 186:14 development 109:20 119:15 120:18 123:18 124:5 130:6 135:10 136:11,16 137:4 160:1 162:3 186:5 development-dri... 196:16 develops 118:10,15 device 88:13 182:14 184:4 dialog 16:19 diammonium 24:11 26:3 die 146:21 died 7:6 8:10 9:16 19:21 203:21 difference 86:4 186:19 187:2 different 21:10 79:3 81:14,16,20 86:22 87:4,10 89:4 92:1 94:15 97:1 100:18 122:3 129:9 144:19 150:15 159:16 167:5,6 172:14 191:19 206:20 208:17 differently 203:17 difficult 85:20 122:4 178:2,5 dioxide 68:18 direct 171:4 207:20 directed 45:3 direction 32:5 151:19 173:11

202-234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. Page 222 205:15 directions 32:3 directly 5:3 29:12 128:10 205:20 director 2:6 47:9 116:12 117:21 148:18,19 171:3 Directors 171:21 dirt 192:2 disagree 202:3 disaster 69:22 129:4,21 130:4,13 130:15 disasters 129:18 131:19 161:15 discharged 209:4 209:13 disciplines 167:6 disconnect 44:7 60:9 discovery 86:8 discuss 6:7 7:17 15:7,14 36:19 40:4 44:15 57:4 105:9 106:3 discussed 13:17 52:18 137:18 145:9 152:13 discusses 66:16 discussing 143:19 discussion 47:1 106:5 112:12 114:7 116:4 117:14 141:14 161:12,19 175:1 discussions 146:6 171:5 193:16 disincentive 169:14 dismissing 97:16 dispatch 61:10,14 61:17 dispatcher 61:18 dispatchers 61:15 disposal 131:4 disrespectful 203:5 disseminated 23:8 dissipation 66:21 distance 33:20 34:3 34:5,10 105:20 198:19 distances 93:3 114:13 144:1 distinction 69:4 distinctions 130:11 distinguishing 130:16 distributed 57:16 58:8 182:11 distributing 181:15 distribution 23:14 24:5 25:13 108:20 173:13 184:15 209:1 distributors 186:11 district 42:2 119:1 disturbed 6:5 diverted 192:6 Division 40:17 71:17 divulge 194:14 document 16:3 33:8 130:9 131:20 132:10 133:1,4 documentation 16:7 17:15 documented 16:1 19:9,19 20:16 133:7 documenting 16:6 doing 83:16 88:3,4 99:15 100:2 137:12 140:21 142:18 175:11 177:11 185:10 198:10 204:4,7 211:5 donation 172:8 door 75:19 189:22 191:9 Dorado 21:11,22 22:6,20 82:10 83:2 86:1 DOT 33:6 doubt 147:18 Doug 6:20 downtown 110:4 152:15 Dr 4:17 9:12 26:20 26:22 155:15 171:3,5,7 177:19 178:10 180:3 187:7 188:4 192:17,21 195:17 199:8 200:12,19 201:10,14 207:16 207:18 208:1,10 210:1,4,15 Dragoo 6:17 dramatically 21:10 draw 66:11 drawings 78:5 194:3 drift 28:19 drill 146:10 drive 152:18 196:11 driven 56:17 70:15 driving 199:5 dropping 154:5 due 18:13 22:13 108:4 130:7 175:4 Dumas 137:20 duty 27:7 98:17,19 124:2 141:16 E E 4:1,1 63:4 earlier 20:1 66:14 71:12 79:9 83:7 91:17 121:22 123:3 137:18 142:9 149:21 156:16 168:17 204:6 209:20 early 86:6 209:10 210:13,14 easier 173:18 174:1 easily 199:20 east 172:19 easterner 78:22 easy 200:1 203:21 echo 96:7 97:18 180:15 183:17 economic 159:22 169:13 edge 128:6 edition 31:15 32:16 33:5 editions 121:22 editor 48:10 117:3 educated 72:20 education 76:7 127:14 188:8 effect 9:19 effected 86:15 effective 29:4 30:15 73:4 119:7 126:5 133:1 161:21 163:2 173:18 effectively 23:8 34:17 37:4 129:22 132:13 151:15 160:8,16 162:7 180:7 effects 19:16 29:16 106:22 effort 13:19 98:1 189:16 efforts 38:16 63:21 64:9 66:7 69:18 188:9 212:21 EHS 41:2,6,10 eight 47:12 90:15 either 71:22 88:13 153:7 154:13 170:13 171:19 192:5 199:17 El 21:11,21 22:6,20 82:10 83:2 86:1 elaborate 45:14 82:22 elected 146:4 180:22 electric 166:17,20 element 63:18 161:21 elevators 24:10 26:2 Elizabeth 47:3,13 email 143:10 embed 55:14 emergency 3:14 6:2 7:17 9:1 10:18,20 13:13 14:17,20 15:19 19:2,9 23:6,9 26:19 27:11,20 30:7 31:8,13,16 31:21 32:19 33:6 33:14 36:20,22 37:5,7,17 38:9,10 38:15 39:20 40:2 40:9,9,13,18 41:22 42:1,13,13 42:18,21 43:18 44:9,11,15 47:1 47:22 48:2 54:16 56:12,18,22 59:2 70:13 71:1,18 120:11,12 122:20 132:19 146:3 152:21 161:16 187:19 emitted 65:7 emphasis 68:11 187:21 emphasize 159:18 emphasizes 52:5 employees 24:14 193:6 EMS 51:2 EMT 27:8 enabling 131:13 enacted 12:12 38:12 114:3 enactment 114:5 encircled 153:18 enclosed 32:9 encountered 105:14 encourage 9:9 39:18 65:12 100:11 102:22 133:5 encouraged 146:14 168:9 178:22

202-234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. Page 223 encourages 38:15 65:3 encouraging 67:9 endeavor 140:12 195:18 endorse 202:4 ends 73:6 energy 118:9 enforce 122:4 150:20 175:14 enforced 29:19 35:8 38:19 39:16 40:15 enforcement 57:22 151:8,11 engage 64:1 67:9 71:2 engaged 17:4 138:13 engaging 16:19 engineer 142:22 Engineer's 109:18 Engineering 48:11 engines 78:9 engulfing 68:15 enlargement 23:19 entertain 44:17 48:19 70:7 entire 9:19 63:18 130:21 179:5 entirely 64:10 67:12 entities 17:4 entitled 120:21 entity 85:6 environment 16:13 119:7,9 139:19 150:16 167:16 170:5,8 environmental 38:18 124:16 137:1 environments 30:17 EPA 38:18 39:16 40:16 43:19,21 46:6,8,11 63:9 67:2,17 89:7 EPA's 41:1 EPCRA 38:12,15 38:17 39:2 40:3,5 40:6,20 42:11 43:4,17 57:14,15 59:12 equal 34:21 equally 10:14 equate 96:10 equation 94:10 equipment 5:11 21:19 25:7 50:6 50:21 69:9 72:19 76:7 91:15 95:21 96:11,18 97:3 equipped 10:19 31:15 equivalency 194:8 Eraso 11:12 ERG 31:20 32:3,11 32:17 34:1 erroneous 81:10 erupted 21:13 escaping 162:15 especially 4:9 5:13 31:9 40:3 89:6 108:1 205:10 213:9,21 Esq 2:10 essence 67:7 essential 31:8 essentially 71:21 101:1 134:5 164:19 establish 100:13 120:4 123:22 133:14 135:20 established 10:21 110:3 125:10 132:6 establishes 120:1 122:12 157:10 establishing 29:21 102:13,15 136:7 193:14 establishments 187:6 estimate 194:21 estimated 24:15 35:10 36:3 estimates 152:19 estimation 90:11 et 73:8 136:12 181:4 ETJ 175:8 Europe 191:21 evac 93:3 evacuate 37:18 64:7,20 65:16 67:16 90:1,5 95:14 evacuated 86:17 evacuating 68:7 93:12 evacuation 22:18 37:16 42:17 69:19 86:15 89:18 evaluate 55:13 92:22 179:6 evaluation 179:10 evaluations 141:7,8 evening 4:4 6:6 7:16 13:4 48:17 48:21 51:14,17 117:18 126:16 137:7 210:22 event 10:20 16:10 19:5 25:4 51:20 130:1,17 events 51:10 94:21 98:16 99:4,13,15 154:13,18 166:5 168:20 172:7 212:2 eventually 96:1 everybody 186:20 186:22 188:22 202:22 203:22 204:1 evidence 16:2 evident 20:13 evolved 129:5 exact 157:18 182:8 185:3 exactly 10:12 65:9 65:18 68:16 73:1 84:19,20 127:4 179:13 180:15 exam 5:9 examine 15:16 26:18 134:21 examining 20:10 26:8 example 34:22 61:14 68:3 91:2 examples 33:11 160:20 166:15 169:22 exception 134:13 excludes 43:7 excuses 190:5 Executive 16:17 47:9 exempt 43:17,17 exempted 43:3 exemption 43:5,6 43:11,12,20 46:7 exercise 42:19 exhaust 95:17 exist 38:6 134:2 149:22 162:1 existed 109:9 113:11 151:3 207:12 existence 113:18,22 125:11 existing 113:9 114:4 120:3,9,22 121:3,4 122:9,22 125:13,20 126:6 126:10 133:12 134:9,15 156:6 158:15,18 exists 111:11 exit 5:22 exits 5:22 6:1 78:14 expand 70:17 expansion 134:15 expect 75:20 141:17 201:14 expectations 141:9 expected 132:4 161:2 expensive 91:14 97:4,4 experience 47:22 73:3 79:5 80:2 93:17,21 94:6,13 96:2 159:4,13 162:11 experienced 55:22 106:9 107:5,8 108:10 111:8 expert 7:15 11:5 163:13 179:13 expertise 56:3,4 77:17 160:16 161:9,11,13,17,18 163:3,12 164:10 165:10 167:6 experts 77:19,20 78:13 79:19 expired 19:6 explain 105:21 explaining 200:18 explode 83:1,2 87:5 exploded 20:9,20 28:4 208:7 exploding 18:21 explore 106:2 explosion 1:3 6:8 7:2,10 13:7 14:7 18:8,10,22 19:20 20:6,17 21:1,4,6 21:16 22:5,12,16 22:19 25:3 27:2 28:2,11,21 37:11 38:1 62:17 84:14 106:10,12,16 107:18 108:9 110:16 120:8 135:20 154:12 176:5 185:2 194:9 200:14,17 201:2,8 202:21 206:10 207:1 209:22 210:3,5 211:4

202-234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. Page 224 explosions 20:15 154:9 200:21 202:12 206:6 213:14 explosive 20:9 26:10,12,13 83:12 112:4 134:2 135:17 144:20 177:4 191:20 199:17,19 207:10 207:15 exposed 20:11 22:2 41:5 184:14 188:2 exposure 27:16 154:17 express 9:14 99:13 extend 49:2 62:19 118:3 extension 121:15 164:16 extensions 121:10 extensive 108:4 214:4 extent 68:1 180:20 extinguish 22:4 64:2 65:10,11 95:15 extinguished 64:16 extinguishing 97:9 extra 79:9 175:8 extremely 18:13 37:1 41:1,3 43:15 105:18 133:18 143:5 eye 54:6 111:3 eyewitnesses 16:1 F fac 83:17 face 12:10 facilitates 147:16 facilities 5:7 8:21 10:4,7,11 16:8 19:12 29:4 52:17 54:11 72:6,9 90:18 91:16 105:19 109:5 111:10,16,19 112:1,7 113:2,4 113:10,18,21 114:1,2,4,14 124:15 132:2 133:21 134:8,21 135:1 138:18,21 139:5,7 140:15 143:18 144:14,16 147:9 152:14 154:21 155:1,10 156:7 159:8 161:22 174:13 181:14 183:3,5,14 185:8,11 facility 10:16 13:8 17:21 21:9,11,13 22:7,15,19,22 23:13 24:5 25:13 26:1 28:19 46:9 54:12 63:3 64:10 73:13 77:10 78:4 78:18 79:10 83:19 84:3 86:14 91:3 94:3,4 105:16 106:1,10 108:14 108:17,17,19,22 109:9,11,16 110:1 110:2,6,8,10,14 110:16,18,19,21 111:4,15 113:11 113:15 115:15,19 122:12 132:5 134:9,12,19 135:6 135:12,14,15 136:10,17 137:19 139:2,15 140:3 143:20 155:17 157:4,19 159:11 163:15 177:21 182:4 184:8 197:10 198:15 facility's 114:15 facing 182:22 fact 64:6 65:4,9 66:12 67:13 80:22 84:18 90:17 96:11 105:15 111:13 115:11 129:2 183:8 184:7 facto 167:4 factor 136:5 202:9 factors 87:10 factory 124:21 125:7 157:12,20 faculty 201:12 202:3 fails 67:21 136:21 failure 108:9 113:1 failures 6:7 fair 135:8 195:17 fall 40:21 136:22 157:13,20 167:1 falls 42:3 families 7:5 8:10 51:19 106:16 138:3 141:20 179:21 204:8 family 9:15 62:20 118:4 150:12 166:1 far 45:16,21,22 60:18 83:14 92:14 93:2 94:14 99:22 115:13 141:4 147:5 157:18 210:6 farm 95:3 farmers 109:2 143:16 195:6 farming 24:6 25:14 108:21 109:1 143:22 fatalities 13:10 19:1,19 20:22 21:5 23:5 37:3 106:11 108:11 faults 208:21 fear 169:9 184:5 features 69:6,11 February 47:19 federal 5:5 29:2 36:10 38:8 39:17 40:16 43:19 44:8 46:6,11,15 52:19 59:15 62:7 77:8 77:15 95:8 138:19 fee 198:20 feedback 147:2 feel 57:3 89:18 90:4 93:11 feeling 93:22 feet 37:9 108:7 193:18 fellow 55:7 200:11 FEMA 129:5 130:6 132:10,18 fertilizer 1:3 12:21 13:8 15:17 18:5 20:13 21:21 23:13 23:21 24:3,4,6,16 24:21 25:6,12,14 25:16,18 26:4,12 27:2,12 32:7 33:3 33:22 37:8 38:10 38:20 39:11 41:6 41:16 42:5 43:2,8 43:13,14,21 44:2 44:3,4,6,10 45:11 45:19 46:7,16 54:12 62:18 63:3 73:13 82:11 83:11 92:18 105:15 106:1,10 108:17 110:1 111:22 112:3 113:3,11,15 115:15,19 122:11 143:16,20,22 173:10,13,22 174:22 175:15 181:16 182:9 183:5 185:5,6,17 190:19 198:14 200:5 fertilizers 108:20 176:22 fewer 35:20 36:1 field 110:1 161:15 182:4 186:21 209:11 fields 48:1 109:6 135:7 fight 18:4 22:15 34:10 50:7 67:22 68:5 93:11 96:14 96:15 fighters 29:6 120:11 fighting 30:1,17 31:14 32:13,22 33:11 34:4 69:2 90:6 208:4 figure 85:7 160:15 163:1 203:11 207:15 figured 191:16 205:4 207:8 figures 194:2 file 60:13 filing 121:17 filling 79:15 final 15:16 177:10 194:4,16 195:19 197:15 212:3,5 finalized 172:22 finally 15:14 18:19 24:22 122:19 169:20 211:21 find 37:18 54:3 75:14 84:6 130:2 169:12 204:18 212:8 finding 7:9 77:12 findings 3:10 5:15 7:13 13:5 15:5 16:15,22 17:6 36:20 fire 1:3 6:8 9:1 13:6 17:8,12,18,20,22 18:1,4,9,12,18,19 18:21 20:6,12 21:9,13,21,22 22:5,7,9,16 27:3,5 27:6,7,9,15 28:10 29:6,8,9,12,16 30:1,17,22 31:14 32:10,13,22 34:2 34:10,11,18,20,22 35:1,9,19 36:3,11

202-234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. Page 225 36:12 37:8,12 41:20 42:7 47:10 48:6,11,11,13,15 49:6,7,8,10,14,16 49:17,20 50:2,4 50:11,15,19 51:2 51:3,7,8 52:22 53:15 58:20 61:10 61:17,17 63:22 64:1,2,3,5,12 65:5 65:5,7,11,13 66:12,21 67:9 68:1,5,13,15,20 69:2,6,10,14 70:4 72:4 74:19 76:12 76:13,13 77:8,12 77:16 78:2,9,11 79:1 84:12,15 85:9 86:7 87:1 90:6 91:7,22 92:3 92:8 93:16 96:15 96:16 98:18 102:7 102:13,16,18 103:3,7,14,16 107:21 114:8,10 114:19,22 115:2,7 115:12,16 116:12 116:15 117:9,21 118:8,12 119:11 119:16,22 120:2,8 120:11 121:2,9,19 122:22 125:19 126:8 136:22 137:10,13 138:22 139:4,13 140:4 141:20 142:6,7 144:13 145:11,12 145:18 148:12,16 149:16 150:4,5,12 151:10,11 153:13 153:16,22 154:1,8 156:3 157:22 158:10,11,12,21 166:11 168:3,12 168:13,16 169:4,7 169:17 170:10 172:2,3 173:2,3 175:16,18,22 176:1,5 178:20,21 179:14,15 181:13 183:3 187:12 188:7 189:11,20 190:20 191:11 200:7 204:15 205:18 206:18 207:8,22 208:4,16 209:16 211:7 fire's 67:13 firefighter 22:9 27:5 34:7,19 35:15,17 50:16,17 52:8,8 53:6 54:19 55:14 66:6 75:4,5 75:11,12,19 92:21 94:1,8 146:19 firefighters 7:7 17:9 21:17 22:14 23:6,9 26:14 27:3 27:4,18,20,22 28:6,9,15 32:12 34:13,16 35:3,5,6 35:12,14,16,19,22 47:15 49:1 50:13 51:22 52:1,2,11 53:18,21 54:4,18 55:8 65:3,13,17 65:21 66:3 67:9 67:12 68:4 69:18 69:20 70:2,3 75:6 75:15 79:7 81:19 86:10 88:11 90:3 91:18 99:1,3,3,11 102:1 137:20,22 146:1,21 161:18 178:17,22 179:2,8 187:15 188:2,18 189:22 190:2 201:1,22 202:12 202:20 203:5,9,22 206:3,7,8,8 208:3 firefighting 57:21 63:2,4,16,21 64:9 64:20 66:7 69:1 77:2 188:17,19 189:1 firefights 137:16 Fireman 47:10 firemen 61:20 180:21 191:12 fires 26:15 32:4 33:11 34:4 49:16 49:19 50:7 64:18 93:11 96:12 176:3 176:8 178:17 187:21 188:3,18 206:21 207:13 firm 142:13 first 12:13 17:15 18:6 22:3,9,11 27:22 31:22 38:10 39:3 40:22 52:6 53:2,12,22 54:22 68:4 82:12 89:15 89:19 101:22 116:8 127:4 134:3 137:14 141:9,20 142:1 154:9 170:6 172:13 176:9 178:11,14 180:22 210:3 fit 74:13 fits 41:15 five 27:3 42:22 79:2 171:13 199:19 209:5 fix 143:4 fixed 5:7 69:10 flammable 39:6 81:4 flash 152:18 flip 135:2 floating 185:7 flood 198:16,17,22 flooding 34:2 floor 107:10 171:2 210:18 flow 71:18 flows 95:10 fluids 122:16 foam 96:16,22 focus 13:12 40:13 63:10 68:7 95:1 128:18 focused 13:19 101:16 129:14 130:11 focuses 129:6 focusing 166:3 folks 54:4 79:14 80:21 93:16 138:4 147:5,17 195:2 follow 40:8 115:20 127:6 129:2 130:17 166:18 followed 180:7 following 14:7 15:3 20:4 64:11 68:12 107:17 155:14 follows 106:20 foot 165:21 193:17 football 182:4 209:11 forced 106:16 forefront 87:11 foregoing 104:12 Forest 160:22 161:1 foresters 161:2,10 forests 192:3 forever 12:9 forfeited 137:6 forklift 91:22 formal 150:17 formally 53:16 formed 18:15 former 48:8,12 formulations 144:20 177:1 forth 189:15 204:12 fortuitous 146:9 forward 14:21 15:15 73:6 85:5 101:20 102:3 116:3 126:6 146:7 172:5 211:2,10 212:11 fought 30:18 found 23:4 36:9,22 40:1 63:13,17 69:15 84:10 122:2 foundation 30:6 four 17:21 21:2 27:9 40:8 68:19 88:2 132:11 181:14,18 188:18 206:15 fox 60:4 FPA 143:3 frame 69:10 153:20 framework 40:6,7 40:8 112:15 126:3 149:13 162:9 France 21:4 frank 47:4,20 56:12 141:14 frankly 55:9 136:20 141:7 friends 8:10 9:15 62:20 144:9 179:21 front 61:8 162:2 177:7 191:15 fruition 168:21 fuel 26:11 28:13 166:21,22 fuels 84:5 85:2 full 10:9 84:2 191:4 191:6,10 195:5 211:22 fully 7:10 179:19 function 162:11 functional 57:19,20 fund 72:1,17 funded 70:18,22 funding 71:14,14 72:19 95:8 99:7 145:22 further 68:8 112:12 144:1 171:10 184:9 209:14 Furthermore 109:8 115:4 future 5:17 9:22

202-234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. Page 226 179:20 205:1 207:11 213:15 G G 4:1 gallon 24:20 25:19 96:21 gallons 65:6 game 134:16 188:20,21 189:3 190:3 gas 166:21,22 167:1 gases 122:15 gather 195:10 gathered 211:9 212:22 213:1 gear 75:20 geared 131:22 general 2:7 4:19 35:1 47:16 51:3 51:17 74:14 153:13 175:3 generally 49:22 74:15 78:4,6 81:20 112:18 157:13 Generation 130:8 generically 141:15 gentlemen 13:4 137:9 152:12 geographical 157:15 geologic 124:17 Germany 20:18 getting 60:10 71:12 90:13 131:18 147:12 198:2 give 32:5 82:19 111:22 125:18 130:3 152:19 160:19 170:12 171:2 210:18 212:4,11 given 66:12 90:17 113:17 138:3 151:12 179:4 gives 32:3 90:9 124:7 glad 59:6 62:3 Glen 48:5 Glenn 47:4 global 72:14 globally 20:16 globe 56:1 go 7:4 11:18 18:18 38:21 51:19 53:15 55:15,16 58:19,20 60:3 72:2 81:17 83:15 95:8 96:22 101:9,20 102:3 134:11,16 141:4 141:11 142:4 144:1 146:11 150:17 158:20 160:17 161:9 162:6 171:18 174:9 176:10 183:22 184:2 189:8,12,17 191:1 191:18 192:10 198:4 206:12 goal 161:4 goes 53:13 59:8 60:12 78:8,8 84:18 95:8,9 102:20 121:9 161:14 162:20 196:8 200:3 going 4:10,12 5:1 53:4 54:15 59:7 60:3 62:5,6 71:3,8 72:21 79:10,12 85:4 91:19 94:8 95:12,17 96:3,7 96:10,17 97:6,10 98:5 102:2 104:9 104:18 105:1,3 129:11 132:21 138:7,9,10 140:7 142:15 143:4,7,11 150:7,22 152:6,22 153:8 155:3 163:13,19 166:22 169:9 172:17 175:20 183:10 184:13,16 185:10 185:13,21 188:11 188:21 189:10 198:12,13 204:8 good 4:3 13:4 27:10 48:21 51:13 117:18 120:5 121:17 126:16 137:7 139:9 144:9 161:17 163:7 169:22 181:11 188:19 200:8 203:13 205:1 goods 32:1 Google 200:18 gotten 72:18 143:2 government 61:2 112:22 116:21 117:22 123:11 191:2 Governor 146:15 graciousness 212:14,16 grade 26:12 112:3 112:4 113:4 gradually 135:11 grain 24:7 25:15 grandfathered 134:19 136:18,19 grandfathering 113:7,13 134:9 grant 71:16 72:19 99:7 121:10 granted 166:17 granting 121:15 grants 47:17 72:2 72:17,18 grapple 11:6 130:22 grappling 155:16 grateful 179:22 grave 67:14 great 59:7 129:5 131:10 142:4 143:1 153:5 159:10 164:13 165:11,11 189:16 greater 111:18 greatly 181:9 green 128:2 grew 78:2 156:10 Griffon 1:17 4:17 6:11,15,16 7:3 9:12,13 11:9 13:3 45:1 62:15 70:12 72:22 73:10,17,22 74:4,8,11 76:19 77:3 78:19 80:3 98:8,13 151:22 155:7 156:11,14 156:18,22 157:17 158:2,7,11,14,19 158:22 160:4 163:4,21 164:6,21 165:4,11,13,15 167:17 grossly 63:14 ground 21:15 29:7 86:14 184:3 208:21 group 47:2 70:16 76:3 172:9,11 182:12 grouped 81:3 grow 109:2 growing 18:4 51:1 131:8 154:2 184:21 185:5 growth 110:5 124:13 181:3 196:13 Guam 119:1 guarantee 27:17 174:8 guard 199:22 guess 10:5 59:21 163:7,9 188:13 193:5 guidance 27:17 30:14 31:4 32:11 33:11,15 43:22 155:14,18 157:22 180:6,8 guide 29:6 32:18 Guidebook 31:16 31:21 33:6 54:17 131:9 guided 198:8 guideline 89:6 guidelines 33:21 89:6 157:5,19 165:1 Gunaratnam 2:11 14:10 36:19,21 45:17 46:11,13 gut 93:22 guy 100:12 101:18 101:18 189:14 guys 183:9 206:12 gym 196:22 197:14 gymnasium 107:19 gymnastics 196:20 196:22 gyms 196:20 H habitat 83:19 hairs 67:4 half 35:21 105:7 halfway 182:1 Hall 153:5 198:10 hand 83:9,11 88:8 88:11 handful 171:10 173:19,20 handicap 167:12 handle 10:19 139:9 handled 160:3 handling 32:6 63:7 63:11 69:9 83:8 83:20 122:8,13 185:22 hands 90:10 happen 9:10 51:11 94:22 127:20 137:4 162:7 173:5 177:10 184:3 happened 7:11 46:10 65:9 84:13 136:1 141:11 153:1 156:13

202-234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. Page 227 168:5 183:16 202:19 207:14 208:15 212:5 happening 152:2 185:3 196:13 212:2 happens 71:1 136:20 138:7 187:16 190:21 happy 56:3 hard 88:14 159:18 hardship 121:14 harm 41:4 Harman 47:4,13,14 51:12,13 75:7 93:9,15 96:6 Harold 51:18 Harris 6:18 hate 199:10 200:10 Haven 205:16,21 hazard 10:6 22:13 22:16 28:16,21 29:1 32:19 57:10 57:13 58:4 92:20 129:9,9,18 132:9 132:11,14,17 134:2 135:9,16,17 158:1 199:1 hazardous 8:22 10:16 30:13 31:3 32:2,6 36:15 40:10 41:2,12 43:15,16 45:13 52:7,9 53:19,22 63:6 71:16 72:3 78:16 113:2 114:13 122:9,20 123:1 125:8,21 157:4,19 166:4 hazards 11:3 31:12 33:13 41:14 117:6 120:8 124:17 125:18 126:10 127:21 128:14,17 128:21 129:2,7,12 133:2,6,12,13 165:19 173:15 174:5 hazmat 31:9 47:17 51:3 52:21 58:5 72:10 74:17 75:13 75:16,21 81:20 head 177:17 headlines 8:13 health 19:12 41:14 120:14 123:15 128:3 137:1 healthcare 16:8 hear 7:15 8:19 12:1 64:22 82:9 93:15 97:14 171:9 181:5 181:11 205:8 heard 52:19 53:11 63:20 100:14 146:1 171:8 174:7 178:15 180:20 183:2,7 185:9 hearing 8:13 11:4 138:13 181:9 191:12 hearings 16:12 146:11 152:9 heart 19:7,21 hearts 7:4 heated 66:22 heavily 108:8 heavy 192:3 197:5 197:12,17 198:12 210:10 height 184:20 185:4 193:12 heightened 80:20 held 25:2 43:9 44:5 116:15 Hello 11:16 help 9:21 11:6 32:12 37:2 38:6 38:13 59:11 61:9 77:20 80:1 103:3 129:16 164:20 165:2 167:13 173:10 192:11 193:1 helpful 97:20 98:2 108:15 211:9 helping 177:21 hen 60:5 heroes 179:12,19 Heroically 88:5 heroism 7:9 hey 61:19 95:3 203:3 Hi 80:6 193:2 high 10:6,16 69:22 94:16,17 95:5,8 95:13 96:8 105:18 127:1 192:2 195:4 195:9 199:18 high-hazard 155:9 155:17 high-power 209:8 high-tension 206:9 highest 119:4 203:20 204:1 highlight 115:11 highlighted 33:15 33:17 135:4 highway 199:5 highways 71:20 HILLARY 2:9 Hillsboro 106:17 109:4 hint 204:10 hinted 204:14 hire 148:11 hired 107:1 hiring 148:16 historical 108:16 167:21 168:4 historically 20:9 history 136:1 137:17 hits 139:21 192:5 hold 124:6 148:21 holding 11:21 183:15 holes 62:2 home 19:21 20:4 37:19 105:17 106:14 204:10 209:7 homeland 48:1 72:18 111:14 112:8 129:7 138:11 140:12,18 homes 28:19 37:13 106:13 110:12 honest 128:18 189:7 honestly 168:7 hope 9:6,19 10:1 12:10 56:7 88:7 97:20 101:7,10,20 176:4 187:20 211:22 212:8 hopeful 147:4 168:18 hopefully 133:8 hoping 101:4,5 206:19 hopper 182:5,6,7 182:10,13,14 183:21 horizon 182:6,6 Horowitz 2:6 171:3 171:6,7 177:19 178:10 180:3 187:7 188:4 192:17,21 195:17 199:8 201:10,14 207:16,18 208:1 208:10 210:1,4,15 hose 18:3 hospital 19:6,22 106:15 hospitality 177:22 Hostead 199:9,10 202:6,10,17 204:16 207:17 hour 22:17 99:5 hours 19:20 99:2 house 60:5 138:12 144:7 146:15 168:10 housed 23:22 25:17 housing 19:11 106:15 124:15 Houston 49:18 hub 108:20 huge 27:2 141:3 142:11 145:10 206:10 humble 174:2 hundred 65:6 hurt 192:7 I IAFF 47:15,18 ICC 115:20 118:2,7 118:10,15,21 119:3 150:10 157:1 165:22 icon 61:19 idea 77:4 172:17 200:8 identification 31:11 78:17 identified 13:14 41:18 115:11 identifying 54:10 182:18 idiosyncracies 162:13 IED 174:19 IEDs 174:21 IFC 120:1,4,20 121:20,22 122:7 122:12,14,19 illustrates 33:12 immediate 19:14 immediately 14:7 18:2 55:6 197:7 205:13 impact 124:11 135:20 137:14 138:2 211:5 impacting 187:22 impaired 8:13 implement 51:9 55:13 170:1 implementation 126:4 211:14 implemented 39:4 61:11 99:6 151:15 179:2 implementing 40:3

202-234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. Page 228 133:2 implements 124:19 implications 34:15 importance 12:7 52:5 54:8 125:9 important 9:6 10:14,14 13:16 22:21 30:8,19 34:16 37:1 52:9 64:15 67:1 108:22 114:10,11 130:20 133:18 181:10 202:22 207:6 213:16 importantly 111:9 impose 134:11 improve 50:21 155:20 improvement 67:20 improving 28:22 inadequacies 5:12 inappropriate 67:8 inaudible 156:16 209:1 incentive 198:22 incident 5:1,8 9:18 13:9 14:17 15:17 15:19 16:11 17:2 17:13,15 18:11 19:18 20:5 21:15 21:21 22:6 23:5,8 24:13 25:8,11 26:7 28:7 30:8,10 30:15 31:6 32:2 37:6 51:6 52:4 58:5 67:3 86:5,5 87:13 94:19 95:19 96:1 106:3 112:11 115:3 138:5 146:21 152:3,8 incidents 20:10 23:7 28:2 30:13 31:3,9 53:9 82:10 83:15 87:1,14 include 7:12 31:10 42:16,18 43:1 78:14,15,16,16 114:12 122:10 124:12,13,20 158:3 included 24:11 27:2 77:1,3 includes 13:22 76:13,14 113:3 122:20 164:16 including 5:10 14:5 19:1 27:10 28:5 35:13 36:6 70:1 118:17 185:5 incorporate 133:8 incorporated 61:3 121:22 incorrect 81:10 increase 20:3 68:19 incredibly 199:20 incumbent 54:3 independent 5:5 15:21 163:16 indescribable 65:1 indicate 33:16 68:18 indicated 52:10 86:9,19 individual 32:21 49:1 53:10 112:17 112:19 individuals 6:11 74:20 industrial 5:13 98:22 124:21 125:7 131:21 132:2 133:6,20 135:6 157:12,20 188:7 197:19,20 198:19 industries 33:2 34:1 59:22 115:5 industry 29:20 56:17 60:19,20,22 61:10,10 70:15 71:6,7 72:1,1,10 72:11 73:5 79:5 96:20 143:12 147:17 164:11 186:17 190:6,7,8 191:2 197:6,12,17 198:12 inevitably 130:17 162:14 infers 79:16 informally 53:17 information 5:20 8:20 10:15 12:6 16:6 30:21 32:18 33:9 39:19 42:11 42:12 60:10 61:16 84:11 87:21 88:10 88:12 112:8 128:4 140:4,10 178:16 195:1 211:8 212:21 informative 97:20 170:19 informed 32:12 198:11 infrastructure 110:7,10,21 156:7 infrastructures 152:16 ingredient 170:3 174:21 inherently 30:18 176:20 initial 22:8 29:6 32:1 69:16 82:14 151:2 209:16 initiatives 152:10 inject 161:12 injured 8:11 9:17 21:7 37:11 62:21 108:4 injuries 8:12 13:11 19:9 20:19,22 21:2,6,17 37:3 106:12 138:5 injury 21:1 innocuous 83:10 input 124:8 151:1 197:2 212:11 inside 26:6 91:20 175:7 insight 31:8 insightful 213:8 inspect 189:9 inspection 139:4 153:13 inspections 9:2 170:2 inspector 189:12 installation 114:17 119:17 instance 87:5 113:10 164:8 172:18 instances 87:2 Institute 185:17 instituted 50:11 instructive 93:8 instructors 48:15 55:22 56:5 instrumental 16:6 Insurance 117:10 117:11 insure 31:12 105:19 118:13 119:8 167:7 insuring 170:7 179:20 183:11 Integrating 132:12 intended 29:15 31:22 38:13 39:1 150:13 intensely 18:13 intensity 18:21 68:19 intent 120:3,22 124:22 intentionally 199:17 inter-reactions 94:5 interdisciplinary 162:5 interest 105:10 164:11 176:7 213:13 interested 11:4 15:11 145:22 205:8 interesting 170:17 170:17 Interestingly 35:21 interim 141:18 146:16 interject 154:19 intermediate 58:12 107:16 intermission 15:2,3 104:9 international 47:14 51:21 53:18 116:13,19 118:1 118:20 119:22 120:13 121:6 123:6,12,14 125:19 126:1 127:10 144:10 150:14 157:2 internet 208:22 interstate 71:20 172:18 intervene 129:16 interviewed 15:22 interviews 24:14 introduce 5:3 8:1 12:22 13:21 44:14 44:17 46:22 48:4 116:7 introduced 7:16 135:10 introducing 7:19 8:4 introduction 47:8 inventory 40:12 45:20 122:21 investigates 5:6 98:19 investigation 4:22 9:20 12:22 13:6 13:15 14:4,16 15:1,4,15,18,20 15:22 17:1 39:22 104:19 105:15 115:5 137:13

202-234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. Page 229 173:9 181:11 186:15 187:3 203:19 204:12 210:20 211:3 investigations 5:9 105:12 213:18 investigative 7:21 13:22 14:8 15:9 44:21 82:9 105:8 176:19 187:10 investigator 2:8,10 2:11,13 4:22 7:14 12:21 85:21 104:18 investigators 14:1 14:5 20:2 171:22 investment 151:5 investments 197:14 invitation 123:9 invite 15:6 116:3 invited 188:15 involved 18:19 22:12 56:21 78:4 78:5,5 88:9,19 90:4 131:19 132:20 141:21 156:13 178:18 involves 40:8 129:18 involving 26:15 28:11 32:14 33:12 34:2,11 68:13 69:2 87:1 136:7 143:13 Iowa 164:15 Iraq 174:18,21 ironically 137:17 Island 116:16 Islands 119:2,3 isolated 132:16 133:21 issue 10:2 16:20 63:2 67:5 92:1 95:2 113:6,13 114:6 115:13 134:4 142:11 143:4 153:12 156:3 170:11 issued 37:16 67:18 146:16 issues 7:17 13:14 15:7 26:18,19 68:8 81:22 83:5,7 105:9 124:16 128:6 133:10 146:10 159:22 160:2 162:17 176:18 issuing 15:16 it'll 172:18 item 3:5 165:20 IZC 118:16 J J 1:19 48:6 Jack 187:8 James 117:1 January 147:20 Jared 131:6 Jerad 2:10 14:9 105:3 Jerry 6:17 Jersey 48:13,14 Jimmy 6:18 job 7:8 50:8 54:4 190:3 198:10 jobs 79:14 144:4 Joey 6:18 John 48:6 178:10 Johnnie 2:8 7:14 12:20 14:9 44:13 46:20 47:5 85:21 97:16 98:5 104:18 116:2 Johnson 116:8,11 117:16,17,20 167:22 169:2,3 joined 117:2 joining 48:16 116:13 joint 14:11 63:8 jointly 31:16 joists 107:20 journal 48:12 Jr 6:21 judged 68:14 judgement 96:4 judgment 34:8 judgments 159:6 Judith 6:18 jumps 61:18 juncture 13:17 June 16:14 117:12 jurisdiction 50:1 119:19 120:19 123:19 124:5 125:2 126:2 150:18 151:17 169:19 175:9,17 175:20 jurisdictions 57:12 118:18 123:21 169:15 Justice 48:7 K KAI 172:9 Kaku 200:12,20 Kansas 28:9 keep 65:13 71:2 72:20,20 100:17 102:22 111:3 197:22 keeping 167:15 Ken 180:10 Kenny 6:18 kept 64:15 105:20 166:9 Kevin 6:20 key 15:22 38:8 42:14 53:5 54:1 54:15,17 129:14 170:3 killed 28:1,10 62:21 137:20 188:18 191:6 killing 28:5 kind 46:10 60:4 71:11,22 76:17 81:15 85:2 134:1 135:21 155:21 158:3 159:1,19 163:10 165:9 167:4 177:1 185:3 188:11 199:15 202:7 kinds 84:5 127:10 127:14 129:13 131:5 132:1 133:10 136:12 161:15 162:1 164:3,10 202:19 Kirk 199:9 knew 46:14 205:16 knocked 92:8 know 5:21 7:6 37:18 38:2,11 45:16,21 46:1,8 46:16 49:12 54:22 55:15 56:16,22 58:19 59:18,20 60:12,14,17,22 61:1,2,7,13 64:3 65:8 66:1 73:7 74:15 76:19 77:19 77:20,21 78:12,22 79:5,18,19 80:21 81:2,13,17,19,21 83:6 84:4,8,9,10 84:12,12,19,19,22 85:3,5,13,14,17 86:3 87:15 88:4 88:18 89:21,21 90:11,20 91:2,2,6 91:15 92:5,11,12 92:18,19,20 93:2 93:4,5 94:2,3,10 94:14,15,19 95:11 95:18 97:14 100:12 101:13,14 102:5,6,21 103:10 103:14 129:8 130:18 134:1,11 134:22 135:18 136:1,1,8 138:15 139:17,17,20 142:11,21 143:11 144:3 146:22 147:1,2 148:8 149:1 150:9 153:16 155:10,12 155:15,18,19 156:8,15,20 159:3 159:7,7,13,19 162:21 164:12,18 165:5,6,8,17,19 166:4,12,15 168:7 168:7 170:12 173:4 182:11,12 183:20,22 186:10 188:6,12 189:5,6 189:8,9,19,20 190:21 191:3,8,13 191:17,22 196:2 197:2 198:6,10 199:4,21 200:15 201:20,21 202:2 202:18 203:9 204:20 205:1,2,6 205:7,9,13 207:14 207:14 209:17 210:21 knowledge 88:8 182:20 183:1 known 31:20 38:12 79:6 knows 162:21 206:4 L labeled 25:9 laboratory 211:6 lack 22:13 44:9 115:12 175:3 ladies 13:4 137:9 lady 209:19 land 3:16 7:18 13:13 15:5,13 49:16,19 105:2,9 105:10 106:6 112:13,14,16 113:6,7 114:6 116:4 117:14 120:18,18 123:19 123:19 124:13 128:10,12,15 133:19 152:8 155:11 175:1

202-234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. Page 230 187:19 landscape 162:18 language 43:10 68:2 80:7,8 large 33:4,19 34:3 64:17 71:22 73:5 76:4 84:2 94:22 95:2,9 102:10 105:17 largely 109:6 110:1 112:15 153:12 larger 13:19 83:6 112:10 163:20 largest 109:10 Lastly 48:4 117:8 late 67:12 138:16 142:12 lately 205:9 latest 119:16 Laughter 168:15 190:12 201:16 launched 139:22 law 38:13,20 40:5,6 40:15 57:15,21 102:19 112:15 141:17 149:22 175:3,4,10 lawfully 125:10 lead 9:20 21:2 26:21 105:3 leader 98:14 leaders 172:11,13 leadership 178:4 leading 23:5 128:5 128:6 leads 32:18 leak 28:18 201:3 leaking 202:14 learned 8:18 12:11 23:4 51:8,10 176:5 195:22 197:22 learning 51:5 98:15 99:14 147:3 leave 64:7 88:11 205:17 leaving 109:6 led 6:7 91:8 130:10 left 4:21 23:19 34:7 44:10 49:22 107:18 204:6,8 205:12 legal 112:14 134:10 legally 187:5 legislation 98:18 126:3 131:13 legislative 124:4 131:9 138:16 142:13 147:19 150:6,18 170:15 legislature 138:17 139:11 142:16 145:22 146:7 168:9 length 193:11 194:21 Lennard 6:21 LEPC 41:20,21 42:5,8,11 56:15 56:16,16,20 58:22 59:3 60:2 70:15 70:17,20 LEPCs 73:3 lessons 9:3 12:11 23:4 51:8,10 98:16 99:14 176:4 let's 77:6 83:3 152:1 letting 55:10 level 29:13 31:5 38:16 39:17 46:15 46:17 52:7,11 54:6,15,15 58:16 60:11,18 74:18,21 74:21,22 75:21 76:14 79:20 80:21 103:12 112:21 118:17,22 120:6 127:19 135:9 145:14 149:8 151:12 165:22 166:10 168:18 169:12 186:21 levels 41:5 58:12,14 74:17,21 81:16 96:3 112:22 120:2 liability 198:21 liberty 194:13 Lieutenant 146:14 life 12:9 21:16 88:22 92:20 118:14 120:7 121:2 125:15,17 126:21 127:2 137:16 141:2 166:10 lifelong 208:13 light 168:20 180:8 likenesses 16:9 limited 30:21 106:15 limits 172:16 175:6 176:2 196:18 line 34:14 98:17,19 141:10,15 157:13 207:21 lines 206:10 209:3 209:4,9 210:12 linings 130:2 link 209:15 linkage 20:5 liquid 81:4 list 15:15 20:14 39:5 41:1,3,9 listed 32:16 listen 147:15 173:7 listening 16:18 196:6 literally 182:3 little 17:10 45:14 70:17 82:22 103:15 108:13 127:3 128:13 133:17 149:20 157:3 159:16 165:16 181:21 199:3 live 7:18 78:22 106:17 191:9 209:5 210:8 lived 76:21 190:18 lives 6:12 8:16 12:14 20:18 21:2 34:14 70:1 173:5 176:9 179:20 living 143:14 190:7 197:10 199:7 load 107:9,10 loading 25:1 local 10:18,20 11:22 35:19 38:2 38:16 39:10 41:20 41:21 50:1 52:18 60:18 61:1 62:8 70:13 72:1 79:20 100:11,12 101:17 112:21 116:20 118:17,22 127:19 132:15,17 133:9 140:3 145:14,15 145:18 148:8 151:12 152:20 155:16 156:2 159:2,14 162:16 163:10 164:17 165:4 168:18 179:12 198:8 locally 11:22 locals 59:15 139:17 locate 110:20 122:4 located 10:7,12,17 14:2 19:4 23:22 35:22 105:16,22 108:6,14 110:5,8 110:10,13 111:19 112:2,9 115:15 173:15 location 33:19 34:5 34:6,9 64:21 68:7 97:7 111:9 120:16 123:16 126:4 locations 5:21 Loeb 2:7 4:21 13:4 logically 211:20 long 19:16 97:1 99:2 116:16 154:16 156:9 162:10 172:1 188:8,16 189:2 193:17,18 210:22 214:2 longer 137:5 look 23:17 55:1,4 60:7 64:8 67:1 84:1 91:19 94:15 95:7 102:2 105:2 108:16 130:4 150:9 162:22 165:21 167:9 171:10 176:7 177:7 185:12 191:19 203:18 looked 86:22 207:4 looking 45:22 62:4 72:6 85:6 87:12 91:11 93:18 101:2 101:6 102:12,13 102:15 133:12 134:22 136:4 144:22 145:8 148:11 161:22 162:12 165:6,18 173:11,12 174:20 176:18,20 177:1,6 181:1 184:3 185:22 186:15 187:3 211:4 looks 83:21 lose 101:17 loss 12:8,13 21:16 88:22 118:5 126:21 137:16 138:4 187:14 lost 6:12 8:15 lot 8:18 50:4 51:5,7 65:8 73:6 76:7 79:8 80:19 81:7 81:16 83:17,21 84:8 87:19 90:9 92:3 93:16,17 96:17 99:21 110:7 128:21 136:5,16 138:10 142:21 162:3 169:9,9 173:5 180:20

202-234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. Page 231 181:2 191:22 195:22 200:13 202:3 205:10 Lou 196:19 Louisiana 116:22 low 94:16,17 95:5 95:13 luck 84:9 212:1 Lucy 14:12 lying 146:13 Lynn 195:20 M M 2:6 M.P.H 1:19 ma'am 195:19 207:19 Magazine 117:4 magnitude 28:16 28:20 107:4 main 78:9,9 174:21 maintain 97:5 maintained 58:15 167:10 major 5:7 21:17 33:19 34:12 134:4 212:2 majority 112:6 115:1 193:7 makers 198:9 making 26:11 30:6 87:20 93:12 96:8 129:16 130:11 143:14 144:21 159:6 160:13 183:9 186:15 190:7 194:2 197:14 malice 156:12 malign 204:3 man 189:13 manage 127:20 145:11,19 managed 145:13 154:13 168:18 management 5:14 10:22 39:1 40:18 48:2,9 56:13,19 56:22 59:2 63:7 71:2,18 73:14 130:15 146:3 152:21 Manager 2:9 116:20 117:6 123:10 managers 132:19 161:16 managing 2:6 30:10 171:3 173:20 mandatary 35:5 mandate 70:22 71:5,13 73:2 173:19 Mandatory 98:18 manmade 129:1 161:16 manned 49:7 manner 132:5 manuals 178:16 manufacturer 33:2 33:5,10 manufacturer's 34:3 manufacturers 173:21 181:6,19 182:16 183:6 185:19 manufacturing 10:13 map 111:21 112:2 112:10 139:16 maps 124:12 marching 146:16 margin 145:2 Mariana 119:3 Mariano 6:19 Mark 1:17 4:17 6:10 116:18 123:4 marks 175:12 marshal 116:15 117:10 137:11 139:13 145:12 150:5 151:10 163:3 168:14 169:4 181:13 183:3 187:13 208:16 Marshal's 206:18 Marshall 102:16 103:15,16 Marshall's 47:10 51:7 98:18 Marshals 139:1 Mary 14:10 196:19 mass 47:18 64:15 massive 33:19 34:12 64:19 65:2 65:14 67:10,13 89:10,14 90:1,5 90:12,13,14 92:13 93:14,19 96:15 178:21 179:16 material 22:12 32:2 33:7 37:10 58:4 71:17 72:3 86:8 88:16 101:15 122:21 193:7 195:3 materials 10:12 23:1 25:9 30:13 32:6 36:15 44:2 52:7,9 53:20 54:1 54:10 63:6 78:17 81:15 84:4,20 114:15 122:9 123:1 125:21 166:4 176:21 183:14 Mates 209:18 mathematical 94:9 matter 56:4 58:5 98:21 104:12 176:3 mattered 40:14 matters 195:12 Matus 6:18 Mayor 4:10,13 11:10 12:19 171:17,20 176:14 177:11,21 178:4,8 180:15,18 181:4,8 181:21 182:7 183:17 212:14 McCavitt 187:8,9 McCORMICK 2:12 McLennan 42:4,4 42:8,20 43:1,11 48:3 56:14 58:13 70:18 102:5,9 109:18 115:14 mealy 190:8 mean 57:2 61:7 71:8 72:14 74:4 75:17 79:13 80:11 80:18 81:14,16 84:9,10,19,22 85:7,12 86:21 91:10,12 92:17 101:2 148:17 149:2,3 153:4 164:4 165:1 168:4 184:4,14 185:4 186:1 187:1 189:9 189:12,19 190:6 190:13 198:13,15 205:21 210:9 meaning 83:19 113:14 means 65:2 66:2 68:16 133:2 134:8 134:10 meant 166:1 measures 12:12 32:20 33:1 114:11 114:12 mechanics 85:1 meet 41:9 153:11 197:14 meeting 1:5 4:4 11:22 13:12 26:21 79:10 178:15 182:2 212:3 213:7 214:4,5,6 meetings 124:7 140:22 143:5 147:5,16 148:21 152:17 153:5 172:14 meets 146:8 member 1:17,19 6:10,15,16 7:3 8:6 8:8 9:13 13:3,3 45:1,6,7 56:15 70:12 72:22 73:10 73:17,22 74:4,8 74:11 76:19 77:3 78:19 80:3,5,13 82:6 98:8,13 104:2 148:4,7,13 149:4,10,14 151:22 155:7 156:11,14,18,22 157:17 158:2,7,11 158:14,19,22 160:4 163:4,21 164:6,21 165:4,11 165:15 167:17 170:20 207:20 208:2 210:2 members 1:13 4:17 8:4 11:20 14:15 15:4 19:2,10,16 27:9 44:18,20 49:1,3 55:21 62:15 117:19,19 118:4 126:16,18 127:7,17 137:8 154:7 178:14 213:12,22 214:1 membership 118:7 150:10 men 203:21 204:4 mention 13:16 66:15 76:10 131:17 mentioned 19:22 67:17 70:15 71:12 79:9 83:7 91:17 100:15 103:3 123:13 140:16 142:9,12 157:2 165:18 169:20 173:2 179:3 181:13 193:3

202-234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. Page 232 196:10 199:11 203:8 merging 53:9 messes 196:5 met 138:12 172:12 197:16 method 28:22 119:8 methods 119:18 Mexico 31:20 mic 192:22 microphone 11:15 mics 192:22 middle 4:11 105:16 mile 175:7 miles 208:8 209:5 military 174:20 million 35:11 138:6 milliseconds 154:11 Mills 27:6 mind 81:6 82:2 83:16 85:13 100:17 102:22 182:15 183:22 mingle 53:4 minimal 29:21 43:22 minimize 29:15 154:17 185:10 minimum 50:2 52:11 75:15,21 120:2,4 121:1,3,6 126:8 169:13 minute 15:2 96:22 131:6 minutes 18:6 22:3 22:8,10 37:22 64:4 87:16,22 104:9,11 171:13 179:8,11 187:12 199:19 203:10,14 misfortune 137:11 Mishio 200:12,20 203:3 missing 196:4 204:13 mission 119:3 Mississippi 184:18 Missouri 28:10 mistake 69:13 mistaken 209:12 mitigating 133:13 mitigation 129:4 129:19 132:9,11 132:14,17 mix 53:4 mixed 24:5 25:14 108:20 mixture 26:12 208:20 mixtures 28:12 model 63:14 106:20 107:2,2 118:10,12,15 119:11 120:1 150:11,17 151:9 159:16 160:18 194:4,6 modeling 211:4 models 169:22 modern 91:3 modernizing 131:12 modifications 114:5 molten 85:10 mom 60:21 moment 5:21 6:14 7:1 129:20 130:5 204:5 Monday 138:14 142:10 money 149:5 181:22 183:9 198:2 monitor 199:21 monitoring 200:6 Monroe 6:18 month 137:12 141:18 143:8 144:8 173:1,1 months 98:21 106:21 178:1 Morgan 211:17 morning 87:19 200:21 Morris 6:16 Moure-Eraso 1:15 4:3,14 6:22 9:11 11:8,14,17 12:18 13:2 44:19 45:5,9 46:4,12,19 47:5 62:14 70:10 82:7 85:19 89:2 93:7 96:5 97:11 98:4 98:10 99:17 100:8 103:2,19,22 104:4 104:8,16 117:18 126:14 148:2,6 149:15 151:20 167:19 168:11 169:1 170:16,22 176:13,16 178:3 185:15 210:17 213:4 mouth 190:9 move 15:18 23:11 55:6,9,17 68:6 70:4 128:13 146:7 151:18 184:8 197:19 212:13 moved 107:3,12 196:14 moving 172:5 211:10 MSDS 33:1,3,7,22 34:3 Mulcahy 14:10 multidisciplinary 165:20 mundane 8:15 municipal 99:1,3 municipalities 112:19 145:17 municipality 113:20 Musclewhite 180:11,12 Muska 4:10,13 11:10,12,16,19 12:19 171:17,20 177:11 178:8 212:14 muster 212:9 mute 6:4 mutual 18:1 N N 4:1 name 4:14 5:1 56:11 116:9 117:20 171:15 193:2 195:20 199:9 208:12 names 6:11 nasty 88:16 nation 55:20 95:6 130:21 national 10:2 29:9 30:22 35:9 50:15 75:8,9 99:22 100:1,13 127:7 128:1 144:12 166:17 192:9 nationally 10:5 63:5,14 120:5 nations 52:3 natural 124:17 128:21 161:15 166:5 nature 22:1 57:20 57:20,22 76:6,8 95:10 130:14 135:16 Navarro 27:6 near 105:16 110:10 110:21 111:10,19 113:3 157:4 nearby 18:2 21:18 28:19 68:7 106:17 necessarily 136:7 163:8 necessary 50:7 99:5 119:21 121:10 170:2 necessities 109:2 need 37:20 38:2 59:16 60:7,7 61:8 61:11,20 63:19 77:18 78:13 100:4 100:17 112:13 143:16,22 144:4 145:3 148:11,15 148:16 153:6 162:22 163:8 167:2 181:20 190:4 206:13 207:14,14 needed 29:5 57:4 72:8 80:22 152:13 205:4 Needless 197:13 needs 50:22 59:12 130:22 150:17 151:12,13,18 174:3 179:6 203:11 207:8 neighborhood 92:22 neighbors 179:21 Neither 69:3 nerve 87:15 nervous 80:13 never 49:19 53:15 54:5 138:7 146:20 187:16 190:20 198:3 202:8 204:9 new 44:6 48:8,13 48:14 116:16 119:17 120:2,9 122:9 131:21 132:2 134:8,12,17 200:11,20 203:1 211:14 NFPA 29:10,13 30:3,11 31:1 35:10 52:10 63:5 63:17 64:8,12 67:7,21 68:2 75:10 115:20 122:17 144:11 180:6 NFPA-1 144:9,13 night 18:11 27:21 65:9 79:15 179:4

202-234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. Page 233 200:15 210:10 nine 22:10 98:21 nitrate 8:21 20:15 21:9 22:1 23:12 24:15 25:20,21 26:16 27:13,15 28:1,4,13,21 29:4 32:7,8,14,16 33:3 33:16 34:2,11 36:16 39:13 41:8 41:15,16 42:7 43:21 45:12 46:2 46:8 63:8,12,13 64:13,14 65:4 66:9 67:20 68:13 68:16,21 69:3,14 69:22 77:10 80:16 83:5,18 85:9,11 86:10,21 87:2,12 88:9,15 92:4 101:2,5,6 111:10 111:17 112:3,5 113:4,9,17,21 115:22 122:13,18 133:22 138:18 139:2,15 140:14 141:12 142:22 144:13,19 153:7 153:18,22 154:6 154:15 155:6 160:3 162:19 166:3 177:3,13 178:18 181:16 185:19 187:22 188:1 189:13 190:17,20 191:5 191:10,14 194:22 195:6,8,8 199:16 200:6 206:21 207:2 nitrates 33:12 nitre 69:5 nitrogen 68:18 154:4 181:16 nitrogen-based 173:13 174:22 182:8 183:4 185:6 non-combustible 23:1 69:8 91:4 114:14 153:10 non-compatible 125:3 non-flammable 101:14 non-inhabited 154:21 non-regulatory 5:5 nonprofit 29:10 north 78:21 110:4 110:8 northeast 193:8 Northern 119:2 northwest 108:1 193:9 210:11 note 6:3 22:21 63:12 107:5,19 112:2 noted 22:11,16 174:17 Notice 110:16 noticed 199:11 notification 18:7 40:10 notify 61:20 noting 170:10 November 28:8 117:4 139:22 209:1 nuclear 182:14 184:4 number 20:3 32:18 37:3 45:10 68:12 68:14,19 74:20 86:22 87:10 92:12 131:1 137:17 152:14 160:18 174:7 186:10 189:20 194:11 numbers 95:16 numerous 138:5 143:17 nursing 19:21 20:4 105:17 106:14 110:11 nuts 149:6 O O 4:1 observation 196:1 observed 17:6 68:11 198:7 obvious 63:22 obviously 66:13 154:20 168:14 207:3 211:11 occasion 165:8 occasional 109:11 occupancies 126:5 126:10 occupancy 120:16 123:17 125:13 occupied 109:15 occupying 121:2 occur 129:18 152:22 occurred 6:8 13:7,9 18:8 20:13 22:19 38:4 44:12 84:14 108:11 126:21 130:1 138:15 142:5,12 occurrence 185:3 occurring 39:9 62:3 occurs 176:8 offer 8:9,11 127:15 139:3 159:15 offering 15:11 190:5 office 14:2 56:19 59:1,1 71:1 98:18 102:15 109:18 139:13 145:12 151:11 206:19 officer 2:12 17:19 officers 93:16 official 37:16 121:9 121:19 123:21 124:12,18 137:21 148:17,18 officials 38:2 146:3 146:4 152:20 167:7 181:1 offline 205:6 offsite 105:13 106:2,9 109:7 Oh 163:21 165:15 204:16 oil 28:13 137:19 188:9 okay 8:6 11:18 45:17 46:4,20 57:7 60:14 72:22 73:17,17 74:1,8 77:4 78:19 80:3 82:6 91:8 103:19 116:7 148:7 149:14 156:18 157:17 158:2,14 170:17 194:7 201:11 207:16 208:1 210:21 Oklahoma 116:22 139:19 174:17 old 48:11 older 134:21 once 18:12 42:10 79:21 135:15 136:15 137:3 one-half 175:7 ones 23:16 186:8 211:14 ongoing 132:5 142:8 194:17 open 109:6 110:1 119:14 126:13 135:7,8 136:8 159:1 171:12 opened 108:18 opener 54:7 opening 3:7 117:15 operating 29:21 operational 142:5 operations 21:18 26:15 43:8 52:7,9 52:22 53:20 54:1 54:15 55:7,17 74:17,22 75:13,16 75:21 76:14 94:15 95:12 120:12 opinion 67:8 69:12 82:20 91:11 173:12 174:2,2,3 201:6 202:4,7 opinions 78:20 82:13 175:2 176:10 opportunity 51:16 103:1 104:3 124:8 169:6 176:11 187:11 212:10 opposite 143:19 option 169:16 205:14 options 179:7 orange 68:17 orchestrators 160:8,10 order 16:17 29:18 34:15 37:16,19 141:9 179:4,19 ordered 22:18 179:17 orderly 120:18 123:18 orders 146:16 ordinances 112:21 113:12,14 ordinary 18:14 184:5 organic 84:4 85:2 organization 5:4 29:11 47:12 49:4 127:7 150:11 185:21 186:7 organizations 185:18 186:3 organize 148:16 organized 179:12 186:1 organizing 185:20 originally 128:20 136:9 168:8 originated 153:17 OSHA 41:12 43:15 45:12,15 52:10

202-234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. Page 234 63:9 67:2,17 89:7 outcomes 21:11 62:6 86:4 87:4 161:7 outreach 147:15 outset 203:19 outside 87:17 124:10 137:20 164:5 172:16 175:5,17 176:2 182:1,3 184:9 196:18 207:2 over-regulation 169:10 overall 31:10 overbearing 177:14 overseas 127:9 overview 14:15 owe 212:3 owner 180:16 oxides 154:4 oxidizers 122:15 oxidizing 122:15,15 Oyewole 2:13 14:11 26:20,22 P P 4:1 48:5 p.m 4:2 18:9 104:13,15 page 3:5 204:7 pages 131:10 paid 72:4 75:3,6 76:16,17 146:2 panel 3:14,16 23:19 44:17 47:2 74:16 82:21 97:13,16,19 99:19 103:16 104:6 106:5 116:8 123:3 128:10 149:21 170:18 203:22 212:19 213:21 PANELIST 148:10 148:14 149:6,12 149:17 170:9 193:6,13,20 194:1 194:3,10,13,15,18 194:19 195:1,13 195:16 201:9,11 201:17 202:8,16 203:18 panelists 14:20 15:7 44:14 45:3,4 46:22 116:3 117:19 panels 7:15,19 11:6 Panhandle 137:21 paperwork 79:17 park 106:18 110:6 110:7 111:5 197:8 parked 184:11 parks 110:11 part 42:4 52:16,21 52:22 53:6 57:6 71:3 84:18 122:21 150:21 159:7 160:5 166:16 178:15 194:15 196:9 203:12 204:11 211:15 participate 71:7 116:4 160:12 213:2 participated 14:6 16:12,16 49:4 participating 117:13 participation 35:6 160:11 214:2 particular 44:21 78:17 94:19 99:12 103:10 105:10 133:4,20 162:18 164:11 186:18 particularly 52:6 122:1 151:2,17 160:10 164:17 partners 140:11 partnership 71:4 parts 40:8 pass 184:13 passes 107:6 212:8 Pastor 178:11 180:15,19 183:18 Paterson 180:10,11 path 15:15 211:2 paths 187:3 pattern 181:4 Patterson 47:4,21 47:21 56:10,11,12 70:21 73:9,15,20 74:2,6,10 88:9 100:10 103:8,21 Paul 172:9 pay 186:17 198:20 peculiarities 162:12 pellets 23:18 28:14 people 4:6 7:6 28:5 35:21 67:15 79:11 86:16 87:20 88:19 93:10 95:16 147:3 147:7,14 161:10 163:14 171:11 182:22 184:14 186:2,7,17 187:5 191:7 198:9 202:18 204:2 205:17 208:8 209:7 percent 35:14,17 35:18 36:12 49:6 52:3 196:15 perfect 152:5 perfectly 129:1 perform 29:1 34:13 performance 29:21 119:6 131:21 132:4 performing 211:7 period 15:11 145:1 145:7 periods 121:12 perished 7:7 138:4 176:9 permit 61:5 131:15 134:8 permitted 125:12 132:3 134:13 permitting 61:4 162:2 Perry 6:17 person 52:22 152:5 personal 12:10 personally 209:21 personnel 31:5 35:2 50:22 64:20 persons 121:2 perspective 84:2 100:12 165:17 pertinent 33:9 ph 180:11 187:8 196:19,20 199:10 200:12 208:13 209:19 Ph.D 1:15 2:6,13 189:12 phase 32:1 142:4 208:21,21,21 phase-in 144:22 phenomenally 196:13 phone 206:15 phones 6:4 phosphate 24:12 26:3 photo 16:1 109:21 109:22 110:15,19 111:1,6 photographs 66:14 111:3 photos 18:11 107:16,20 192:8 physical 5:11 16:2 41:14 124:5 physically 95:17 121:13 physics 200:19 pick 199:10 200:10 picking 195:7 picture 155:16 pictures 190:22 piece 166:14 pieces 196:2,7 pile 154:6,9 place 5:18 12:13 63:21 129:15 130:19 151:13 162:15 172:4 193:7 211:13 213:18 places 68:11 73:21 166:12 183:11 placing 67:14 plain 198:17 plan 30:5 42:2,13 42:14,16,19,21 43:2 55:13 56:22 57:10,13,19 58:2 58:3,9 73:14 77:22 121:18 124:4,9,12,12,19 133:9 149:1,9 172:20,21 178:19 planned 104:20 190:14 planner 136:3 planners 129:15 132:19 159:19 160:7 161:1 planning 3:16 7:18 10:20 13:13 15:6 15:13 26:19 29:2 29:3,5 30:4,15 36:20,22 38:9,11 38:16 39:21 40:2 40:9,14 41:22 43:18 44:10,15 47:2 57:5 58:12 60:9 70:14 77:5,9 77:18 78:3 105:2 105:9,11 106:7 112:13,14 113:6,8 114:7 116:5 117:2 117:3,6,14 122:20 123:22 124:2,6,9 126:19 127:8,15 127:16,18,21 128:2,6,9,12,17 129:3,8 130:7,13 131:13,16 132:12 132:15 133:19 148:19,20,21,22 149:7 152:8

202-234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. Page 235 155:11,16 156:17 159:2,14 160:17 161:1,13 162:16 163:11 164:16,19 172:7,14,15 187:20 189:4 196:8,10 198:7 plans 10:22 36:14 42:17 57:17,18 93:1 132:17 179:3 plant 17:18 19:4 25:1 27:12 78:18 92:18 173:10 192:3,3 planting 195:5 plants 36:15 173:16,22 175:15 175:17 190:19 191:19,20 play 156:9 190:3 played 20:7 44:8 108:22 playground 106:18 playing 186:21 please 5:20 6:4,15 8:7 98:11,12 163:21,22 171:14 188:6 192:11 pleased 116:7 plywood 154:1 pocket 54:19 podium 171:19 point 5:20 58:6,7 77:7 85:20 90:14 92:14 93:10 111:3 133:15 134:3 136:20 144:6 145:5 159:16 163:6 182:18 183:19 184:15 204:13 pointed 77:5 114:9 points 129:14 poisonous 28:18 police 17:18 policies 198:17 policy 141:19 142:11,14 147:13 160:9,12 pony 101:8 pop 60:21 populated 111:11 population 35:15 35:17 114:21 145:10,16 150:2,3 populations 52:3 114:19 populous 115:18 port 20:21 28:4 portion 26:17 105:1,3 pose 66:9 121:14 125:7 posed 10:9 126:10 poses 163:1 173:15 position 116:15 182:20 positioned 24:22 positions 117:5 positive 62:6 186:4 possibility 29:15 201:7 202:11 possible 31:12 64:18 65:21 66:2 66:20 possibly 160:1 202:21 post 139:18 Post-Disaster 130:8 potassium 24:12 26:3 potential 23:3 32:19 69:21 109:7 135:18,19 152:22 182:22 potentially 182:13 potentials 53:7,8 pounds 41:13 107:9 111:18 139:8 power 206:10 PowerPoint 206:5 practical 121:14 practice 30:12 79:15 120:6 127:10 128:7 practices 30:1 128:5 132:12 140:22 141:13 152:17 153:11 169:22 186:10 prayer 12:11 pre-fire 189:4 prefer 154:20 preincident 29:1,3 29:5 30:4,5 36:14 77:5,9,18 78:3 preliminary 3:9 7:13 13:5 16:15 36:19 premises 120:10 prepare 38:6,14 prepared 13:5 preparedness 58:14,16 preparing 42:14 preplan 78:14 91:18 preplanned 37:20 preplanning 38:4 52:16,17 94:2,13 123:2 prerequisite 75:12 prescribed 178:19 presence 18:13 68:18 212:18 present 1:13 2:4 13:5 15:4 25:10 48:18 51:16 125:22 presentation 3:9 7:12,20 15:18 26:18 36:18 77:6 105:1,8,21 116:2 131:6 135:5 147:3 presentations 104:20 142:2,3 presented 22:12 President 47:16 48:14 51:18 118:3 Presidential 16:17 press 143:7 pressure 107:3,4,8 154:3 pretty 82:16 126:12 139:16 143:2 147:8 200:1 200:1,16 203:13 205:5 206:15 prevent 5:16 9:21 17:3 34:15 39:3,8 106:7 115:2 136:11,13 146:17 167:14 207:10 preventing 68:8 213:14 prevention 13:19 118:9 187:21 previous 17:5 20:10 23:5 previously 37:21 40:15 122:2 123:2 prills 23:17,17 primarily 39:5 primary 58:21 principles 128:22 prior 15:16 22:5 38:5 40:2 110:16 113:11 164:22 priorities 30:21 132:14 179:10 prioritize 179:7 private 112:16 pro 75:9 168:16 proactive 166:14 proactively 115:8 probabilities 94:16 probability 94:17 95:5,13 probably 81:10 90:15 103:17 166:8 167:21,22 174:8 200:9 209:13,15 problem 67:6,11 79:22 90:12,12 106:4 111:12 112:10 137:2 problematic 65:16 problems 40:1 81:21 133:20 136:13 procedures 42:16 63:17 proceed 12:19 proceeding 11:9 proceedings 6:5 13:21 105:4 process 15:21 23:14 52:16 58:1 59:11,14 60:8,9 101:18 119:15 129:16,20 132:15 132:16 141:9 144:14 146:18 150:8,18,22 151:1 151:17 160:12,17 161:13 164:20 169:4,11 170:7 177:7 211:16,19 produce 44:6 150:11,12 produced 2:17 31:17 89:7 106:21 107:12 131:19 154:4 produces 29:14 165:22 product 33:9,10 143:15 173:16,20 174:10,11,15,16 174:18 181:6,17 182:9,16 183:5,10 183:11 184:17 production 174:4 products 66:17,22 119:5,18 173:14 173:14 185:6 profession 29:20 professional 31:2 75:15 127:8,14,15 professionals 132:22 Professor 48:6

202-234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. Page 236 180:5 199:10 professors 200:12 profit 145:2 program 4:12 7:17 8:2 12:20 39:1,8 39:10,14,15 49:5 50:12,18 104:10 152:18 programs 34:21 35:2 39:18 42:17 55:21 56:2,3 127:22 progress 194:18 progressed 17:20 progression 18:9 129:3 prohibited 150:4 prohibitive 177:14 prohibits 175:11 project 71:22 160:22 213:10 promise 210:22 prompt 32:12 promptly 64:16 promulgation 113:12 propagates 107:6 proper 96:3,11 169:12 property 12:9 69:21 88:21 120:7 120:15 123:15 126:5 180:16 196:17 proportions 64:19 65:15 proposed 89:4,16 135:1 proposing 144:8,15 145:14 prospective 134:6 prospectively 161:22 protect 35:20 36:1 52:2 69:21 114:11 184:16 protected 33:19 34:4,6,9 69:7 protecting 6:12 protection 29:9 30:22 35:2,9 38:18 48:9 50:16 69:6 120:7 176:1 protocols 59:9 provide 14:21 17:13 43:22 67:21 81:18 114:10 119:4 120:10 121:1 124:8 126:2 152:17 156:2 165:9 provided 2:18 32:11 33:1,4,10 34:1 53:19 66:20 72:11 109:1 125:14 132:10 provides 30:7,14 31:3 40:5,7 67:7 126:8 162:9 providing 120:6 121:3 provision 63:19 66:15 145:9 155:2 provisions 63:11 63:13 65:3,12 proximities 10:7 proximity 109:15 115:18 136:17 137:5 159:11 prudent 88:17 94:11 psi 107:9 public 1:5 3:18 4:4 15:10 16:14 24:7 25:15 27:10 40:19 106:5 108:21 120:15 123:15 124:7 136:9 139:19 141:22 142:11,14 147:13 148:21,22 151:1 160:9,10,12 169:4 171:5,7 172:14 182:18 184:16 212:3,10 213:7 publication 63:8 published 143:6 publisher 188:7 Puerto 119:1 pull 92:22 163:16 183:20 pulled 86:13 205:12 206:1 punitive 59:21 purely 69:19 purpose 26:11 93:6 120:13 123:13 purposes 152:21 push 191:1,2 Pustejovsky 6:19 put 12:13 34:14 46:6 55:7 60:13 77:22 92:12 95:14 96:12 131:3 132:7 143:7,18 153:10 155:14 159:10 177:12 179:14 182:16 187:20 194:20 204:12 206:5 208:5 209:9 210:12 213:18 putting 73:6 148:19 149:2,8 166:11 puzzle 196:1,3,7 Q quadrant 193:8,9 qualified 55:22 quality 119:4 127:1 quantify 89:12 90:21 94:7 quantities 41:3,13 42:6 46:2 94:4 111:17 question 45:10 73:1,2 74:16 82:8 82:21 83:1 85:18 89:11 92:9,11 93:5 103:4,14,17 103:18,20 131:14 131:22 133:22,22 134:10 135:3,12 135:14 152:5 155:8,9,15 159:1 159:2 163:5,9,17 164:2,22 167:20 167:21 168:1 172:10 175:15 180:18 181:8 185:14,16 203:7 questions 3:12 11:7 14:22 15:8 44:18 44:21 45:2 48:19 57:3 70:7,11,13 90:3 126:13 129:1 148:1,3 152:1 160:19 192:20 195:17 quick 95:6 203:7 205:5 quicker 95:14 quickly 38:3 64:18 72:7 133:16 201:11 quit 190:5 quite 50:5 141:7 142:18 144:11 quote 64:12 65:20 66:19 68:4,14 quoting 180:5 R R 4:1 Rachel 2:11 14:10 36:18 45:11 radioactive 81:4 radius 110:13 Rafael 1:15 4:14 rail 24:8,22 25:20 25:22 54:11 195:5 railroad 162:20 199:2 208:7 railway 54:22 rally 160:11 ran 179:18 randomness 86:20 86:20 range 214:2 rapid 66:21 68:19 rapidly 17:21 18:4 18:18 rate 107:11 reach 64:19 135:19 reaches 65:14 react 81:21 reacted 185:20 reaction 66:22 201:4 reactive 134:6 read 80:7,8 100:15 178:16 reading 131:10 ready 104:17 198:1 198:4 Reagan 210:13 real 9:8 54:6 201:11 realistic 101:21 102:1 realize 201:20 realized 72:7 realizing 64:5 really 4:7 52:5 59:8 59:11,20 65:16 72:21 76:10 82:18 85:6,7 86:2 87:15 87:19 88:15,18 94:20 103:13 111:7 129:14 130:21 134:3 146:9 147:11 150:9 162:3 169:10,11 171:11 198:13 200:8 204:13,20 206:13 211:18,18 realms 81:3 reason 165:22 168:4 reasonable 120:6 144:5 168:2 reasons 144:18 Reba 14:12 rebuild 129:21 rebuilding 22:22 rebuilt 22:22

202-234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. Page 237 recall 73:15 recapture 138:8 receive 34:16 71:13 73:12,18 received 17:16 73:20,22 153:2 recognize 4:6,10 59:5 145:6 recognized 63:5 120:5 recognizing 53:7,8 54:9 recommend 69:1,2 69:14 124:3 recommendation 67:11 115:6 211:16 recommendations 5:15 17:3 63:4 64:11 65:18 67:8 69:4 81:1,9 82:5 100:1 115:21 155:20 211:15,19 212:6 213:17 recommended 30:1 30:12 63:16 recommending 84:17 recommends 84:15 reconstruction 130:19 194:16 reconvene 104:17 record 104:13,14 200:2 recorded 21:17 199:12 recovery 129:4,20 130:8,14,15 recreate 25:6 recreating 16:9 recruits 54:2 reduce 37:2 174:15 redundancy 138:20 Reed 6:19 reestablish 134:17 refer 140:6 reference 205:1 references 122:16 referring 45:18 refers 183:8 reflects 83:12 reframe 163:19 reframing 163:5 regard 131:16 132:2 152:8 159:18 203:20 regarding 12:4 62:16 75:4 regardless 145:16 regards 54:8 58:16 75:8 95:21 regional 14:2 72:13 72:14 116:20 123:10 regionally 76:5 regret 126:21 regular 74:5 79:14 regularly 142:19 regulate 29:20 112:16 173:18 175:5,7,16 regulated 38:17 39:16 75:5 120:17 123:18 regulates 126:4 regulation 9:2 39:4 103:5 114:1 186:19,20 187:2,4 regulations 5:12 26:9 38:6,8 52:20 101:1 109:9 113:20 175:3 211:13 regulatory 186:16 211:12 reinforcing 153:4 related 5:11 15:7 15:12 16:16 26:18 28:2 56:20 77:12 relates 59:3 123:7 Relations 116:21 117:22 123:11 relationships 159:21 release 21:3 40:9 40:11 109:12 141:17,21 143:7 released 16:15 reliance 136:22 relief 17:6 relies 68:1 rely 157:21 187:6 remain 118:13 remaining 185:11 remains 119:9 remarks 5:2 63:1 127:6 213:5 remediate 177:10 remedy 156:4 remember 76:22 191:12 209:5,7 remembrance 7:2 reminded 8:3 reminder 94:21 201:12 remiss 177:20 remote 90:18 remotely 21:19 91:16 199:12 200:3 removal 145:14 remove 138:20 174:5 removes 156:4 reoccurrence 17:3 repeat 183:15 repeatedly 160:18 report 12:12 15:16 17:17 22:9 40:20 40:22 41:12,16,19 41:19 44:5 45:15 45:19,20 46:3,15 46:17 51:7 59:22 130:7 141:16 175:13 194:4 195:19 211:22 reported 19:1 41:8 42:5,10 45:11,12 46:1 111:13 112:7 reporting 40:11 58:18 59:14 122:21 reports 58:19 78:6 79:16 100:16 repository 56:19 59:2 representation 147:8 representing 47:14 127:7 185:18 represents 51:22 request 131:20 requested 72:16 require 76:12 114:8,14,16 131:15 required 10:22 39:11 42:22 46:15 46:17 115:20 124:6 requirement 61:4 61:15 71:7 77:8 77:15 125:9 requirements 29:3 35:1 36:10 43:18 49:22 57:12 60:20 74:19 75:4 120:4 120:21 121:4,6,13 121:21 122:2,7,10 122:12,17,22 125:21 126:9 155:4 169:18 requires 123:20 150:6 151:1,9 requiring 39:2 114:13 136:10 research 80:18 83:16,17,21 84:7 85:16 117:6 119:16 127:21 128:4,18 133:7 142:10,18 177:11 191:3 192:8 researching 9:8 reserve 45:2 resided 19:3 residence 20:4 residences 16:7 109:14 111:6 157:7 resident 19:21 208:13 residential 111:20 118:11 124:21,22 125:6,6 157:11,12 157:14 172:20 197:9 residents 36:2 37:8 37:10,17 44:11 68:8 resilient 119:10 126:22 129:17 130:1 resistant 91:7 resolved 153:12 resonated 86:3 resources 30:22 50:9 56:7 72:11 73:7 77:19 95:20 131:2 151:9,13 159:5 163:16 164:3,8 165:6 167:13 170:1 respect 130:14 204:2 respond 32:4 37:4 72:8,16 86:11 87:17 99:4 176:3 176:7 178:17 201:9 204:9 responded 17:22 28:7 88:1 142:8 responders 9:1 10:19 12:14 18:3 19:2,9 22:3 23:9 27:20 31:2,22 33:14 37:7 42:18 44:11 52:6 53:22 82:14 101:22 120:12 137:14,22 176:9 180:22 responding 28:1 30:12 37:1 61:21 69:17 70:3 response 3:14 7:18

202-234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. Page 238 13:13 14:18,20 15:19 16:11 23:6 26:15,20 27:11 30:15 31:13,16,21 32:20 33:6 36:20 37:17 42:2,13,14 42:21 44:15 47:1 47:22 51:4 54:17 63:2 86:7 99:1 176:2 181:7 187:19 responsibility 58:21 162:16 175:14 responsible 176:1 rest 55:20 74:15 79:2 205:16,21 209:7 restrictions 136:12 149:21 result 19:19 25:3 106:15 160:15 174:14 resulted 13:10 21:3 21:5 106:10 resulting 20:21 results 9:8 12:1 retail 24:5 25:13 46:7 108:19 retailer 43:9 retailers 44:4 rethink 130:3 rethought 177:2 retirement 197:11 retroactive 121:13 121:21 145:3 155:2,4 retroactively 126:7 retrofitted 153:7 retrospective 134:7 Rettling 196:20 Reverend 203:8,11 review 7:13 reviewed 42:22 rewrite 130:9 rewritten 63:19 Richard 2:7 4:21 Rico 119:1 ridiculous 199:15 right 4:19 38:11 57:8 60:14 74:11 74:13 77:4 80:3 84:3,12 88:18 90:16 93:15 95:8 102:12 104:5 107:20 138:22 139:20 141:14,22 143:19 144:15 147:18 149:22 156:11 158:19,22 160:4 166:12,12 171:15 172:16 179:16 181:15 185:14 190:14 191:9,15 192:7 194:14 203:6 210:12 rights 57:15 rigs 88:13 risen 140:20 risk 7:10 10:9,22 28:20 29:1 30:19 38:22 39:1 55:8 55:12 70:1 73:13 94:16,17 95:5,9 95:13,13 96:9 97:7 154:17 158:3 158:3,13 159:10 185:10 risks 29:16 188:2 Riverhead 116:15 RMP 39:7,11 73:12 RMPs 73:19 Robert 6:20 Roberts 116:18,19 123:4,8 126:15 149:19 157:9,18 158:5,9,12,15,20 165:13,16 robust 72:3 rocket 189:8 role 20:6 44:9 108:22 164:2 roof 18:16 24:18 107:20,22 108:10 154:2,6,8,10 room 153:17,19 163:13 root 17:2 211:20 Rosenberg 1:19 4:18 8:6,8 9:12 13:3 45:6,7 62:15 80:5,13 82:6 104:2 148:4,7,13 149:4,10,14 170:20 209:20 Rosenberg's 155:15 rough 139:16 roughly 203:10 route 19:6,22 routine 43:7 119:20 rule 198:18 rules 11:2 57:14 60:22 198:16 run 49:15,16,18,19 runoff 197:8 rural 36:1 90:18 94:22 100:18,19 114:18 147:6,9 164:17 rushing 142:15 S S 4:1 sacks 191:11 sacrifice 180:1 safe 11:3 34:10 37:18 63:7 64:21 68:7 105:20 118:13 119:9 129:11 166:20 167:1,15 170:4 185:22 187:22 195:13 safeguard 120:14 123:14 126:9 safely 66:1,5 68:5 safer 127:1 129:17 173:19 174:4,10 174:12,14 176:20 177:9 181:21 192:14 safety 1:1,13,16,17 1:20 2:18 4:5,15 4:20 5:13,14,20 9:7,20 12:4 27:18 29:22 31:12 33:7 40:19 68:8 69:11 86:8 114:11 118:8 119:6,11 120:2,7 120:11 121:2 126:17 150:16 166:10,19 169:13 170:7 171:4 173:9 173:14 174:5 188:9 Saldivar 6:19 sale 43:9 Samaritans 27:10 Samuel 2:13 14:11 26:20 36:21 Sanders 6:20 save 109:3 173:5 saw 66:13 131:6 146:19 154:12 190:20 194:5 saying 93:18 150:5 185:12 190:15 191:13 200:15 204:17 208:17 says 46:5 60:2,13 88:14 181:21 191:14 198:18 Sc.D 1:19 scale 83:21 84:2 194:5 scenario 55:3 153:15 163:10 scene 16:1 22:10 29:7 31:11 96:9 179:9 schedule 143:6 scheduled 190:14 schedules 42:18 213:2 school 72:20 105:16,18 107:16 107:22 108:2 164:19 schools 16:8 19:11 106:14 109:14 110:12,17 157:7 157:12 159:11 Schroff 14:12 Schwab 117:1,2 126:16 159:15 160:5 163:18 164:1,7 165:3,7 Schwab's 165:17 science 48:6 189:8 scope 106:4 scoping 121:8 screen 23:20 screenshot 206:14 sealed 84:14 season 184:21 185:5 195:5 seat 116:10 seats 18:14 second 9:5 15:6 38:22 105:7 116:7 138:14 Secondarily 139:3 Secretariate 31:19 section 26:21 121:8 sections 122:3 125:19 sector 5:17 secured 172:8 security 16:21 48:1 72:19 111:14 112:9 129:7 138:11 139:18 140:13,19 199:22 see 16:5 46:19 50:4 62:6 67:3 74:13 77:6 87:11 91:21 92:2 94:8 107:2,7 107:14 112:6 141:22 154:20 163:7 177:8 186:13,16 190:13 200:19 204:9 213:16

202-234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. Page 239 seed 153:17,19 seeing 138:1 seeks 105:21 106:1 106:3 seemingly 65:19 seen 69:11 146:20 188:17 190:21 192:8 193:16,17 segregate 153:9 Seismic 154:11 selected 14:19 self 29:20 sellers 186:11 Senate 16:13 144:8 send 60:12 72:20 143:9,11 Senior 116:20 123:10 sense 81:7 82:3 109:22 110:19 111:7,22 145:19 193:19 199:14 sensitive 145:4 159:12 sent 138:22 sentiments 97:19 separate 125:5 separating 125:3 September 116:14 sequence 154:13,18 series 18:10 serious 40:1 113:16 178:21 seriously 188:14 serve 146:4 served 48:1,14 serves 10:1 47:9 48:10 115:10 116:11 service 12:3,4 29:12 48:11,15 116:12 117:21 140:5 160:22 164:16 167:2 services 49:7 119:5 serving 116:21 117:4 123:12 session 108:3 138:16 142:13 147:20 170:15 sessions 16:18 set 15:6 50:1 63:18 65:2 68:11 69:3 81:8 82:4 93:2 127:5 setback 114:13 sets 132:22 seven 208:8 severe 41:4 105:13 106:9 Shaitberger 51:18 Shallow-Tyler 14:13 Shamrock 137:19 share 39:10 56:3,7 56:8 213:13 shared 128:19 140:10 sharing 39:19 shed 168:20 sheet 86:9 sheets 33:8 141:7 shingles 18:16 24:19 208:18 ship 20:19 28:3 84:13 shock 85:7 87:8 short 8:5 107:5 179:11 show 109:19 192:8 showed 179:12 showing 121:16 shown 23:18 121:11 shows 112:10 206:16 side 23:19 70:2 90:20 92:16 108:1 135:2 197:10,11 sides 6:1 sight 101:17 sign 92:4 sign-up 141:6 signed 171:11 significant 44:9 114:4 147:8 152:15 significantly 142:3 silence 6:14 7:1 silver 130:2 similar 5:16 17:4 21:9 23:16 33:4 36:2 77:11 82:16 105:19 106:7 similarities 144:12 similarly 16:20 28:8 simple 78:14 149:2 simply 8:15 70:4 92:22 135:13 148:10 187:5 sincerely 9:6 single 122:5 sir 199:8 208:11 sit 173:7 190:8 site 16:21 23:22 24:11 25:18 29:4 31:7 36:13 88:3 91:17 109:22 122:11 188:9 siting 11:2 113:2 157:4 sitting 99:10 184:19 situation 22:4 30:7 31:9 32:10 73:12 83:9 89:13 134:18 134:20 136:15,21 155:13 157:7 179:6 185:12 200:16 204:22 205:2,4 Situational 31:7 situations 32:4 34:18 89:18 94:16 six 28:9 72:15 96:21 size 85:8 102:8 175:4,11 193:10 193:19 size-fits-all 131:12 skill 52:15 skills 52:14 skipped 8:3 slide 40:4 45:10 slides 107:15 slight 67:20 slim 145:1 slip 188:12 slowly 109:14 small 23:18 36:1 60:21 101:18 103:6 168:3 182:13 184:4 smaller 95:4 Smart 131:8 smarter 192:14 Smith 140:6 smoke 68:17,20 205:15 206:11 207:3,7,9,12,15 207:22 208:14,20 209:14 210:7,7,9 snap 17:10 87:19 203:10 Snokhous 6:20,20 soak 127:13 Society 48:15 software 152:18 sold 24:5 25:13 108:20 solution 131:12 163:2 solutions 133:2 136:6,14 144:5 solved 196:3 solving 137:2 somebody 60:15 191:1,2 192:10,12 196:4 199:21 somewhat 82:3 sons 208:4 soon 144:17 sorry 8:6 10:10 40:6 93:6 98:11 98:13 148:17 149:16 165:15 sort 67:4 74:8 77:17 79:5,11 80:17 82:4 83:9 83:10,13 168:2 198:21 sorts 79:16 161:6 source 26:11 South 190:18 southeast 112:9 209:5 210:8,8,11 space 32:9 135:8 136:8,10 spatial 159:20 speak 6:11 103:9,9 103:10 176:11 187:11 Speaker 146:15 speakers 188:15 speaking 206:2,6 special 82:4 132:16 specialist 76:2 specialists 161:3 211:17 specialized 76:3,7 96:19 97:5 specific 29:5 36:13 58:18 64:11 67:4 81:1,2,8 83:1,14 125:3,18,20 126:8 149:1 169:18 specifically 67:19 74:16 83:18 148:12,15 specificity 157:6 specifics 89:17 specified 121:11 speculating 200:22 206:2 speculation 200:13 205:10 spell 171:14 spending 137:11 spent 128:20 split 67:4 139:8 157:16 spoke 187:13 209:18 sporadic 74:9

202-234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. Page 240 spraying 202:12 spread 19:12 144:16 spreading 201:2 sprinkler 17:8 92:7 100:14,16,21 101:12 114:17 154:14 sprinklered 91:4 92:7 sprinklers 18:17 69:9 153:8 173:2 173:3 spur 204:5 St 172:8 staff 2:4 116:14 117:19 126:17 128:19 131:4 137:8 142:19 187:10 188:14 213:16 staffing 95:16 stage 13:14 127:5 133:8 stance 179:17 stand 55:16,18 58:3 86:19 standard 30:4 31:1 59:12 102:6 standards 5:13 29:10,11,15,17,19 30:3 49:11,21 50:2,16 57:15 59:8 75:9,11 80:9 100:13 101:11,21 102:2,21 111:15 119:5 122:17 131:21 132:4 192:10 standing 94:9 stands 32:9 41:21 start 13:20 14:14 48:20 70:12 83:3 109:20 112:13 117:16 148:10,19 148:22 152:1 162:2 started 6:10 17:16 18:12 149:20 196:14 200:8 starting 44:2 starts 62:7 110:4 state 10:20 17:11 29:18 38:16,19 39:17 40:16 41:21 42:8 43:3,11 44:8 46:17 47:10 49:8 49:11,13 51:6 57:4,9,11 58:11 58:20 59:15 60:13 62:8 76:11,11,15 76:15 97:2 98:17 98:22 102:6,17,19 103:16 116:20 117:9 118:22 126:20 128:8 131:12,14 137:10 137:14 138:19 139:1,8,12 140:11 140:15 141:17 144:10 145:12 150:5,8 151:10 152:14 155:12,13 155:19 164:2,15 164:22 165:1,3,7 169:3,16 170:11 175:4 181:14 183:4,7 184:18,20 185:7 187:12 189:16 206:18 208:16 stated 37:21 40:15 145:10 156:16 168:17 statement 3:7,20 48:18 65:20 98:12 117:16 122:21 statements 8:5 14:21 99:18 states 9:5 30:5 35:12 36:4,13 40:7 44:1 52:1 76:11 98:15 112:17,17 118:17 118:19,22 119:8 164:14 175:13 statewide 17:11 145:11 stating 180:6 station 88:11 191:9 196:12 198:6 status 140:14 statute 145:15 168:8 step 79:9 88:17 151:7 170:7 stepped 99:9 182:1 steps 210:19 stimulating 213:8 stinging 18:3 stop 137:6 181:19 184:8 203:2 stopped 181:15 182:3 storage 8:20 21:14 23:14 24:4 25:12 26:1 32:6 39:12 40:10 63:7,11 65:4 66:9 69:3 77:10 78:18 83:8 83:19 84:3 85:1 91:16 108:19 112:3,4 113:9 115:21 122:8,13 141:13 153:10 174:12 185:12 188:1 store 111:17 173:16 stored 21:12 23:10 23:17 24:1,16 26:4,6 64:13 storing 10:13 183:4 story 97:1 strapped 53:11 strategies 30:9 strategy 30:16 stream 182:17 street 37:14 197:11 197:12 210:13 strictly 35:7,8 striking 86:3 strong 175:2 213:13 stronger 129:22 struck 87:15 structure 18:17 21:14 23:21 25:15 49:15,19 65:22 66:4 69:10 96:15 107:5 153:9 154:7 154:10,16 158:13 structures 16:10 21:19 66:8 107:8 120:10,17 123:17 125:20 126:6,11 153:20 158:18 study 71:19 stuff 84:17 191:13 191:14 208:19 stupid 203:5 subdivision 197:9 subdivisions 110:11 subject 56:4 113:22 121:17 130:20 subjected 27:15 subjective 32:21 34:8 submit 212:6 submitted 45:21 subsequent 29:7 subset 13:18 substance 43:15 substances 41:2,7 43:7 substantial 107:12 107:18 110:9 substantially 177:3 substantive 147:19 successful 140:1 sudden 190:10 suffered 118:5 suggested 179:3 suggesting 177:5 suggestions 173:8 suggests 34:1,4 68:3 sulfate 24:11,12 26:3,4 summary 133:17 summer 130:7 Supervisory 2:8 supplied 65:6 supplies 24:6 25:14 100:20 108:21 195:7 supply 22:13 95:22 96:13,13 97:9 100:19,21 support 55:11 187:17 208:20 supported 27:11 supports 153:21 154:1 supposed 29:22 supposedly 185:7 suppression 17:9 51:3 sure 11:15 12:6 75:2 138:7 140:13 156:1,8 165:7 166:9 187:15 192:21 194:2 201:10 surpasses 55:5 surrounded 109:6 110:17 surrounding 19:10 22:19 39:20 66:10 67:15 68:9 86:15 105:9 surveillance 91:12 91:15 survey 16:3 survived 182:10 sustain 70:19 sustainability 118:10 sustainable 119:9 167:16 170:4 swath 128:11 swiftly 185:20 switch 184:11 switching 184:12

202-234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. Page 241 sworn 69:21 sympathy 8:11 system 17:8 61:16 62:1 92:8 100:21 101:12 154:15 systematic 121:18 systems 5:14 100:15,16 114:17 T TABLE 3:4 tackle 37:7 tactics 30:10 take 5:21 7:8 12:22 51:8 52:14 54:16 79:8 98:5 104:9 108:15 116:10 124:15 128:11 129:12 130:19 133:5 137:1 141:6 149:17 162:14,22 166:16 taken 18:11 76:4 89:9 95:22 97:22 105:19 107:17 176:6 197:1 213:1 takes 97:5 128:14 talk 128:12 140:5 141:15 147:13 161:19 180:20 181:2 189:14 198:6 200:9 203:3 206:13,19 207:5 talked 123:3 128:19 142:19 147:4,7 talking 61:22 88:21 89:8 101:3 132:9 162:8 187:14 189:3 193:6 210:5 tangible 59:21 tank 95:3 tanker 54:11 tanks 24:20 25:19 28:17 202:13 205:19 tapped 164:12 target 142:16 task 203:21 212:17 tasked 16:20 88:4 tasks 34:13 TDI 117:11 teaching 189:3 team 4:22 5:3 7:21 8:1 11:5 13:1,14 13:22 14:8,16 15:1,4,9,14,18 17:2 44:22 72:3 72:11,14 82:9 105:8 176:19 177:22 211:3 213:9 team's 15:5 technical 48:10 165:9 technically 115:16 technician 76:1 techniques 119:17 technologies 176:20 technology 119:16 177:15 tell 50:19 60:16,21 72:2 79:4 127:3 138:17 147:14 175:21 189:10 190:16 193:21 telling 100:2 ten 104:9,10 tens 183:12 term 19:16 90:9 156:9 183:7 terms 32:5 33:18 65:1 66:16 89:8 146:17 155:8 193:11 Territorial 175:8 terrorist 21:1 testify 62:16 100:7 testing 84:3 211:6 Texas 6:9 9:4 13:8 17:11 20:21 21:10 21:22 22:22 27:21 28:5,6,15 34:22 36:2 38:19 39:17 40:17 42:9,22 43:3,12 47:11 48:22 49:6,9,12 49:15 50:20 51:20 52:4 56:14 57:5,9 57:11 58:11 61:3 62:17 63:22 69:20 71:17 75:6 76:20 78:12 80:20 82:11 83:3 84:13 86:1 94:20 96:20 98:14 98:20,22 99:6 100:18 102:17 103:5 112:1,11 113:5 114:7,18 115:1,7,9,12 116:22 117:9,11 118:6,18 122:11 123:7,12 137:16 137:17 138:18 141:2,3 143:12 145:10 146:7 147:1,9,18 149:22 152:3,7 168:1 169:19 170:11 175:10 184:19,20 189:17,21 190:18 191:4,8 thank 4:13 7:3 8:2 8:8 9:10,11,13 11:7,8,21 12:2,15 12:17,18 26:22 36:21 44:16 46:5 46:20,21 48:16 51:12,13,15 56:6 56:9,11 62:9,11 62:13,15 70:8,9 80:2 82:6,7 89:2 96:5 97:11,12,13 97:17,19 98:3,4 99:17,20 100:6,8 100:9 103:1,21 104:2,5,16,22 105:5 116:5,6 117:13,17 123:8,8 126:13,14 142:19 147:20,21 148:7 151:20 156:22,22 163:4 165:12,12 167:17,18,19 170:18,20 171:20 176:13 177:19,20 178:2,8,13 180:3 180:12,12,13,14 187:7,9 188:3 192:14,17 195:15 199:8 210:1,15,17 212:13,18,19 213:3,4,6,9,11,20 214:4 thanks 62:13 80:4 104:5 171:21 176:12 188:14 207:16,17 thick 101:13 thing 46:5 53:12 58:10 59:4 74:5 76:17 88:17 98:9 100:11 103:4 128:8 155:21 161:14 188:22 190:16 191:18 192:1 204:3 things 53:4 57:22 58:8 59:5,7,13 60:1,6 61:7,9 62:1 76:5,8,15 79:17 80:18 81:5,17,22 83:15,20 84:5 85:12 86:18 90:19 91:8,10 92:21 95:10 129:13 130:12 138:8 142:5 145:19 153:14 159:17 160:14 162:2 167:8 176:22 188:15 189:4,5 190:19 191:20,21 208:18 think 45:1,7 59:4,6 59:9 60:7,8 61:9 62:5 74:12 76:22 77:6,11,15 79:7 79:20 80:22 81:9 83:4,10,11 84:8 84:18 85:4,15 86:6,16 88:6 89:1 91:1,7,14 92:4,6 92:13 94:8 95:11 97:13 98:14 99:21 100:4,4 101:19 103:5 130:12,21 133:17 135:3,17 141:19 145:2 146:8 147:12,17 155:14 159:1,7 163:12 164:4,4,13 165:1,19 168:14 168:17,19,21 169:3,5,8 173:1 177:14,20 180:4 181:10 190:4 194:4 195:13 196:3,7 199:20 201:6,18,19,21 202:1,20 203:16 203:18 204:21 205:13 208:15 209:10 210:4,15 211:8 thinking 52:15 162:16 205:22 third 115:5 137:15 142:4 thorough 31:10 thoroughly 85:4 130:22 thought 25:10 43:12,16 187:13 199:1 thoughts 77:14 thousand 10:4 96:21 147:7 192:12,13 thousands 173:21 173:22 183:13 196:2 threat 66:9 125:8 163:1 three 33:15,20

202-234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. Page 242 58:11 106:14 119:14 127:22 138:12 147:7 171:13 172:14 three-year 144:22 throwing 99:11 THURSDAY 1:7 ti 85:6 tied 133:1 164:10 tier 45:19 46:2 56:20 58:18,19 59:3 78:5,16 tight 53:13 tile 107:10 time 17:10 18:8 24:13 26:7 27:22 36:17 37:22 38:3 46:22 54:3 56:6 62:10 67:16 70:2 90:19 92:15 93:2 97:21 102:4 107:6 109:5,9 116:1 121:11,12,15 125:11 128:20,21 130:10 132:3 141:10 145:5 146:9 168:21 179:16,18 183:20 188:16 190:15 194:21 202:4,11 212:6,12 213:1 timely 34:17 times 94:18 100:15 138:12 143:17 TNT 194:8 today 4:16 47:20 52:18 91:12 113:21 114:9 176:12 194:5 213:7,12 today's 7:12 79:18 told 185:1 197:15 197:18 204:8 toll 27:1 Tommy 4:10 11:10 180:15,19 181:4 181:21 182:7 183:18 Tommy's 181:8 ton 25:20 177:12 183:12 tonight 11:4 12:5 13:18 14:5,11 62:16,22 63:12,20 123:9 177:22 178:15 179:4,13 181:5 206:19 211:9,17 212:19 212:22 tonight's 12:6 13:12 14:15 tons 20:20 21:3,12 24:15 25:2 26:5 28:3 182:14 183:13,13 193:3 tool 126:2 134:6,6 134:7 137:5,6 164:13 toolbox 167:13 tools 50:6 72:8 159:5 top 18:16 181:12 192:4 toppled 25:2 tornado 58:6 totally 196:5 touchstone 211:18 tour 25:5 78:4 147:1 town 4:8 5:1 116:16 153:4 156:10 163:15 174:9 175:11 178:7 184:9,12 209:6,6 210:8 towns 103:6 168:4 184:18,19 toxic 39:6,13 40:11 41:4 88:15 track 110:6 184:2 tracks 175:18,19 207:21 tragedies 9:21 tragedy 7:5 8:19 9:6,16 180:9 tragic 6:7 12:8 51:10,20 94:21 98:16 99:15 trail 92:15 trailer/magazine 28:11 trailers 32:10 train 54:2 55:14 182:2 183:21 184:2,7,10,10 199:6 trained 50:13 74:20 160:2,7 training 8:22 34:17 34:19,21 42:17 47:18 49:11 50:6 50:12 52:6,13 53:14,15,20,21 54:1,3,6,9,14 55:11,21 56:2 74:17 75:22 76:14 81:15,17,18 93:20 94:12 96:3,18 97:5,7 99:5,11 146:1,2 151:14 159:20 160:6 189:5 trains 174:7,9 traipsing 195:21 tranquility 8:16 transcend 101:5 transcript 2:17 171:16 transferred 25:22 transmission 208:22 209:3 210:12 transparency 140:9 Transport 31:18 transportation 31:18,20 32:2,4 124:14 174:11 transported 174:6 transporting 64:14 traumatized 8:14 19:18 traveled 153:17 treat 197:17 treated 32:9 tree 161:3,5 trees 192:4,6 tremendous 198:20 trick 101:7 tricky 130:20 tried 205:7 trip 109:3 truck 24:9 25:22 199:5 trucks 31:14 96:22 true 203:1 truly 94:13 170:4 try 65:10 81:18 85:6 90:10 205:18 trying 7:7 37:7 79:11 85:18 94:9 132:20 143:17 145:11 163:14 169:12 177:9 212:17 turn 36:17 44:13 112:17 116:1 147:22 165:5 turned 199:18 turning 195:11 turnout 75:20 turnover 195:4,9 TV 154:12 two 7:15 13:17 19:2 24:20 25:19 27:4 27:10 38:8 40:21 46:3 50:17 52:8 58:18,19 68:15 74:21 75:5,12 76:13,13 77:2 78:5,16 82:10 89:4 108:11 128:2 129:14 132:22 138:19,19 140:18 146:8 147:7 154:9 193:4 199:22 208:3 Two's 45:20 twos 56:20 59:3 type 24:1 50:7 69:5 78:15 89:12 96:9 96:12,18 97:3,8 99:4,12 139:14 159:11 213:14 types 10:6,12 94:21 112:7 113:2 typical 80:9 124:19 129:13 typically 112:20 113:8 U U.S 1:1,13,16,17,20 2:18 4:5 16:13 26:9 31:17 38:18 112:15 118:18 119:2 127:9 ultimate 43:9 ultimately 5:14 110:11 unaffected 25:4 unaware 37:9 uncertain 146:17 uncontrollable 64:6,19 65:1 67:10,14 89:10,14 89:22 90:5,14 92:13 93:19 undefined 65:14 90:9 underfunded 50:5 undergo 114:4 119:13 understand 57:5 76:2 79:21 81:19 85:4 108:13 128:9 128:16 129:8 135:16 141:19 143:2 149:10 159:20,22 161:4,7 178:19 189:1 195:3 202:22 207:6 understanding 10:3,10,11 53:1 79:11 112:14

202-234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. Page 243 150:1 169:7 179:1 understatement 137:15 understood 27:16 33:18 134:5 151:14 undertake 150:8 undocumented 19:16 undue 121:14 unexpected 95:4 unfortunately 84:9 179:18 unfunded 70:22 71:5,13 73:2 unincorporated 102:14 unique 80:15 81:6 82:3 169:19 United 9:5 35:12 36:4,13 52:1 98:15 units 17:21 88:3 universities 164:9 University 48:7 164:15 200:11,20 unlawful 174:15 unprecedented 147:2 unpredictability 20:11 unpredictable 30:18 unpredictive 22:1 unprepared 44:11 untenable 89:1 unusual 207:7 up-to-date 119:11 update 119:13,20 152:2 updates 140:13 Uptmor 6:21 urban 94:22 95:2 161:1,10 use 3:16 5:14 7:18 13:13 15:5,13 43:6 46:7 54:16 105:2,9,10 106:7 112:13,14 113:6,8 114:6 116:4 117:14 120:16 122:8,13 123:6,16 124:13 125:13,14 125:19 128:10,12 128:15 133:19 134:15 136:12 152:8,20 155:11 164:14 171:19 174:15 175:1 187:19 188:20 useful 16:9 97:14 118:14 165:2 users 32:21 uses 42:11 120:18 123:19 124:14 125:3,4,10,22 126:5,7,10 usually 76:4 79:6 81:3 utilities 124:15 utilize 106:6 123:1 utilized 23:10 167:12 V vacuum 143:13 vague 32:21 64:22 89:8 vain 12:14 value 87:8 variant 32:17 variations 32:15 varies 34:19 variety 24:2 25:17 81:14 various 57:16 127:10,14 136:12 138:8 144:18 173:8 179:7 vary 49:11 vast 49:12 vehicle 64:14 65:22 66:4 vehicles 31:15 vein 176:10 vented 205:19 ventilate 84:15 ventilation 66:20 67:5 84:11 85:8 venting 66:13 venture 10:5 verified 152:15 154:10 versus 69:9 vested 164:11 vicinity 24:21 victim 19:5 victims 6:13 7:2,4,5 video 66:13 91:11 199:12,12 200:4 206:17 videos 190:22 206:15 view 25:7 93:10 128:9 Vincent 172:8 violent 18:7 Virgin 119:2 virtual 25:5 virtually 87:3 visiting 79:10 visually 109:19 vital 12:3 volatile 30:18 voltage 209:9 volumes 64:17 voluntary 29:17 35:7 139:3,4 volunteer 7:7 17:22 18:3 27:3,5,6,8,19 34:20 35:1,5,16 35:19,22 36:7,8 36:11 49:7,10 53:21 75:2 76:16 76:17 77:12,16 78:2 79:3 99:2 102:3 127:17 142:6 146:2 186:8 186:13,22 191:12 volunteering 187:6 volunteers 76:10 76:12 vote 212:8,9 W Waco 48:3 56:13 72:4 106:17 109:3 wait 45:8 57:3,6 waiting 182:10 wake 10:2 27:1 67:3 190:4 Waldwick 48:13 walk 16:3 walked 189:22 walking 205:3 walks 75:19 walkthrough 197:16 walls 108:10 want 8:9 12:2,4 49:2 57:1,2,6,7 60:15,16 71:21 74:12 89:22 97:15 97:18 128:8 131:17 132:7,8 133:14,16 135:18 149:17 155:22 166:8 171:19 180:14 183:17 184:15 190:16 191:1,3,8 192:9 192:21 199:21 201:5 204:20 212:13,18,19 213:11 wanted 77:13 80:6 99:13 139:11 148:8 157:1 163:6 174:1 196:21 wants 140:19 warehouse 17:6 32:8 69:15 196:18 197:7 warning 57:21 58:4 58:6,7 92:4 182:17 Washington 5:6 14:1 wasn't 22:17 196:10 wastepaper 91:21 watch 183:21 watching 37:12 55:9 60:5 162:11 water 22:13 64:17 86:11,12 95:21,22 96:13,13 97:8 100:19,20,20 178:20 179:14 201:2,5 202:13 208:5 wave 107:3,6,11 wax 20:20 28:3 way 55:18 57:4 59:14 60:10 61:4 62:7 64:5 82:15 86:21 89:12 92:14 141:8 172:1 174:1 186:14 208:6 ways 106:6 133:12 154:17 156:19 we'll 7:15 14:14 23:11 48:19,20 56:2 60:15,16 106:4 117:16 141:5 143:8 144:7 144:17 146:10 147:6,22 171:7 189:6,17 192:22 195:18 211:5,7,14 211:21 212:2 213:15,18 we're 13:5 45:21 54:3 62:5,6 84:17 88:21 92:2 98:5 99:10,15 101:3,5 102:2,9,12,13,15 105:1 127:11 128:9 129:11 132:20 140:21 141:5,16 143:3,4 143:6,11 145:8,14 146:18 147:1,12 147:16 150:10 153:3 155:2 165:18 167:14 172:2,21 181:1

202-234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. Page 244 185:13 190:2 193:13 194:1,13 210:22 we've 16:15 25:5 52:18,19 53:11 57:10 58:13,15 72:16,18 83:20 85:15 86:22 99:9 99:21,21 138:6 139:5 140:20 141:3 142:17 143:7 147:4 153:12 158:16 159:17 190:2,10 192:13 200:15 202:8 204:11,12 204:14 211:8 weak 209:15 wealth 212:21 Weapons 47:17 weave 132:13 website 44:1 139:12,12 143:9 203:4 206:14 Weeks 192:19 193:2,3,10,15,21 194:7,11,20 195:11,15 weighted 94:18 welcome 4:4 11:13 11:20 12:5,16 48:22 105:6 195:16 welfare 120:15 123:15 wells 100:19 went 87:22 104:13 104:14 197:3 209:2,6 weren't 202:12,13 206:22 west 1:3 4:22 5:8 6:8 9:3 11:13,21 12:10,17,21 13:7 13:8 14:17 15:17 17:18,21 18:3 19:4,13 20:13 21:16,20 22:3 23:13,17,22 24:4 25:6,12 27:1,3,8 27:20 28:15 33:3 33:22 36:2 37:8 38:9,19 39:11 40:14 41:6,15 42:3,5,7 43:2,12 43:14,20 44:2,10 45:11,19 46:16 49:3,15 50:10 51:6,20 52:4 62:17 63:2,21,22 64:10 65:17 67:3 69:11,15 73:12,13 82:11 83:2 86:1,4 87:14,18 88:1 94:20 104:19 105:14,22 106:3,8 106:17 107:16 108:15,22 109:13 109:21 110:7 111:2,5,12 112:1 112:11 113:5,10 113:15 115:3,14 115:19 118:6 122:11 137:12,22 138:15 141:11,15 142:6,12 143:19 146:17,20 148:9 153:15 156:10 168:20 172:1,4,19 175:4,11,22 180:16 181:3 184:9 191:4 200:4 200:19 205:16,21 206:20,22 208:13 212:15 western 14:2 whatsoever 201:7 white 23:18 188:7 188:11 190:13 195:20,20 wide 19:12 193:17 193:18 widespread 13:11 width 193:11 wild 49:16,19 William 6:21 wind 205:15 206:9 208:6 210:9 winding 210:22 window 87:18 windows 37:12 wisdom 88:6 187:13 withdraw 64:21 65:21 66:3 67:12 90:6 178:22 179:5 wold 91:18 wonder 77:13 82:12 85:20 173:10 wondered 70:16 74:18 wonderful 138:1 wondering 152:4,7 159:3,12 200:7 wood 17:7 23:15 24:18 25:16 69:10 153:20 154:1 wooden 18:14 23:16 24:1,16 26:6 154:7 word 188:20 words 4:11 11:11 work 9:7 14:4 62:3 70:19 80:17,18 99:22 149:7 150:13 152:10 166:2 171:22 178:6 188:13 191:22 194:18 195:2 204:2 worked 159:17 188:8 worker 196:1 workers 92:20 working 17:17 72:9 127:9 130:6 131:3 147:16 160:21 167:11 172:2,22 175:12,13 190:7 194:1 213:15 Works 16:14 world 75:2,3 78:10 79:18 188:7 191:19 world-class 196:21 worries 186:6 worry 177:18 worse 10:19 worst 55:3 137:16 worth 138:6 170:9 170:14 wouldn't 202:2 wrap 90:10 written 60:1 wrong 69:16 100:4 173:11 200:3 204:15,18 X Y Yazu 184:17 year 7:6 48:11 49:16 53:22 118:5 127:13 171:22 178:5 179:5 180:14 183:16 185:2,4 200:6,13 202:17 203:9,15 205:11 year's 212:1 years 41:8 43:1 47:12,22 53:19 54:5 58:14 61:6 71:15 76:22 81:11 93:20 95:1 96:2 109:13,20 119:14 130:10 131:3,8,18 132:11 135:10 140:18 146:8,19 160:21 177:16 189:2 195:22 York 48:8 116:16 200:11,20 203:2 Yutter 208:12,13 210:5 Z Zero 184:3 zip 139:14 zone 135:19 136:8 152:19 155:17 197:5 198:19 199:1 zoned 198:2 zones 124:22 125:1 125:4,6,7 157:10 198:5 zoning 8:21 11:1 109:8 112:19 113:8,19 114:3 118:16 120:14 123:6,14,20,21 124:18,20 125:5 125:12,17 126:1,3 127:18 131:13,16 133:19 134:5,18 135:3,12 136:7,20 137:5 148:12,13 148:14,17,18 149:12 156:2,3 157:2,13 158:5,7 158:17 159:3 161:21 166:13 170:12 172:7 196:9,10,11 198:7 0 1 1 107:8 209:1 1,350 111:16 1,600 49:9 131:10 1,900 49:8 1,995 36:6 10 54:5 122:1 131:8 137:21 177:16 193:16 10,000 41:13 86:16 139:8 165:21 100 25:2,20 37:9 100-year 198:17 105 3:16 11 118:17 120:22 121:8 12 19:1 137:22

202-234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. Page 245 12-inch 107:10,10 12,000 24:20 25:19 128 48:11 134 138:21 14 13:10 19:1,18 106:11 144 107:9 15 7:6 15:2 32:15 54:5 130:9 177:12 192:11 15-foot 192:2 15th 19:5 16 28:2 130:10 1620 30:4 17 6:9 12:8 13:10 16:14 17:14 27:21 171 3:18 17th 38:5 40:2 44:12 138:11 142:6 172:7 18 21:2 141:4 147:5 18,000 139:21 1896 29:13 19 137:19 1900s 209:10 210:14 1910 209:10 1921 20:17 1947 20:19 28:3 137:18 1950s 80:19 109:21 1956 137:18 1960s 113:19 1961 108:18 1962 108:18 1970s 113:19 1975 57:10 1985 117:4 1986 38:13 57:14 1988 28:8 1998 116:16 1999 39:4 48:3 59:19 1st 139:22,22 2 2,000 20:19 111:18 189:20 2,300 20:20 28:3 2,500 21:5 36:2 2,610 36:5 20 18:6 37:21 54:5 64:4 76:22 87:22 131:18 179:8,11 193:17 203:10,14 20-feet 193:17 20,050 36:7 200 106:11 2000 72:6 209:1 2001 21:5 2002 30:13 2003 21:6 115:4,13 2004 71:15 2007 116:14,17 2009 21:8,21 69:20 82:10 2010 30:5 110:9 2012 35:13 41:17 42:5 45:16 46:1 117:12 2013 6:9 13:10 16:14 17:14 27:21 31:3 47:19 62:17 67:18 139:5 2014 1:7 139:6 213 3:20 22 1:7 22:3 57:18 23,000 48:22 230 19:8 24 22:7 87:16 118:17 25 47:19,21 53:19 25,000 35:20 250 13:11 250,000 114:20,21 145:9 150:2 26 21:6 28:6 29 28:8 3 30,000 182:14 30,100 36:3 300 29:14 300,000 51:22 31 21:5 35:14 32 99:2,5 345,950 35:13 350 106:13 36 146:19 37 45:10 3D 194:6 4 4 3:7 122:19 40 24:15 26:5 182:6 193:3 195:22 40-feet 193:18 40,000 127:9 400 63:5,17 64:8,12 65:3 66:16 67:7 67:21 68:2,22 84:14 143:3 417 173:9 44 3:12 450 108:7 46 154:22 183:3 185:11 47 3:14 471 30:11 472 31:1 52:10 48 141:4 5 5,000 20:22 53:22 127:12 5,445 36:6 5,700 21:3 50 81:11 118:22 189:2 500 20:18 550 21:12 581 20:21 28:5 6 6:30 4:2 60 24:15 26:5 193:3 600 20:18 600-foot 110:13 60s 110:2 63 122:14 66 139:9 140:22 144:16 69 35:16 79:1 7 7 122:1 7:23 104:13 7:30 17:14 7:35 104:15 7:53 18:8 70s 110:3 72 196:14 775 147:4 78 49:6 783,300 35:15 8 8 3:10 8,000 201:12 80s 110:5 85 36:12 52:3 9

FD06471 | 2014_美国_West 肥料 爆炸 与 火灾 - West Fertilizer Explosion and Fire__最终报告_6.pdf

分类:06_境外及港澳台调查报告 | 年份:2014 | 地域: | 严重程度: | 场所: | 起火原因:燃气/爆炸 | 来源格式:pdf

Written Testimony of U.S. Chemical Safety Board Chairperson Rafael Moure-Eraso at March 6, 2014, Senate Environment and Public Works Committee Hearing Entitled “Preventing Potential Chemical Threats and Improving Safety: Oversight of the President’s Executive Order on Improving Chemical Facility Safety and Security” Chairman Boxer, Senator Vitter, and distinguished Committee members – thank you for inviting me today. I am Dr. Rafael Moure-Eraso, Chairperson of the U.S. Chemical Safety Board. The incidents that we are discussing – Chevron, Tesoro, Freedom Industries, West Fertilizer, and Williams Olefins – are tragedies of the kind that were preventable. The United States is facing an industrial chemical safety crisis. As we near the one-year anniversary of the West Fertilizer Explosion that fatally injured fifteen, I view my goal as Chairman of the CSB as ensuring that progress is made to prevent similar catastrophes from occurring. I wish every American could hear the frustration and heartbreak that the CSB encounters – at accident sites and at public meetings following these accidents. Workers, emergency responders, and the public continue to die and suffer injuries in horrendous explosions and fires. Estus Ken Powell, who lost his daughter Kathryn in the 2010 fire at Tesoro’s refinery in Washington State, stood up at a recent CSB public meeting to demand action to stop these horrible accidents. Mr. Powell said, “My life was forever changed. All I want to know is, does anybody care? It seems we can get nobody to have any teeth in anything, to get anything done.” Of course, we all do care. And we want to get something done, something with teeth. And I believe what we need is comprehensive regulatory reform. But achieving safety reforms is complicated and time-consuming. In the interim, I advocate that the Environmental Protection Agency step in and use its authority under the Clean Air Act’s general duty clause to encourage chemical facilities to take steps to make their operations inherently safer where it is feasible to do so. The law assigns owners and operators of these facilities a general duty to identify hazards, design and maintain safe facilities and minimize the consequences of leaks. But most importantly, the EPA should follow up by adopting specific regulations to meet those goals, so that there are clear requirements on the books. My testimony includes a number of examples where companies could have used available, feasible, safer technologies to prevent disastrous accidents, but chose not to do so. After the West, Texas, explosion, President Obama issued an executive order requiring federal agencies to review safety rules at chemical facilities. I am encouraged by the leadership of the White House on this issue, and I hope that regulatory agencies respond in kind. The EPA is working with other agencies to comply, but in the meantime, the agency has the authority to act now, on its own, to require inherently safer design, equipment and processes which would significantly aid in preventing more catastrophes.

Refinery Safety In a draft report released to the public on December 16, 2013, the CSB proposed recommendations for substantial changes to the way refineries are regulated in California. Entitled “Regulatory Report: Chevron Richmond Refinery Pipe Rupture and Fire,” the CSB draft calls on California to replace the current patchwork of largely reactive and activity-based regulations with a more rigorous, performance-based regulatory regime – similar to those successfully adopted in the aerospace and nuclear sectors in the U.S. and overseas throughout the European Union including countries such as the United Kingdom, Norway, and Australia – known as the “safety case” system. The draft report is the second part of three in the CSB’s investigation of the August 2012 process fire in the crude unit at the Chevron refinery in Richmond, California. That fire endangered 19 workers and sent more than 15,000 residents to the hospital for medical attention. In response to the incident, the State of California established an Interagency Working Group on Refinery Safety, an initiative undertaken by Governor Jerry Brown. I would like to take this opportunity to heartily applaud the findings and recommendations contained in the working group’s final report entitled “Improving Public and Worker Safety at Oil Refineries.”

This report is an important milestone for improving refinery safety across the State of California and effectively addressing many of the CSB’s safety recommendations contained in our Chevron refinery accident report released in April 2013.

The working group’s final report includes a number of strong recommendations which are in alignment with the CSB’s recommendations: that refineries should implement inherently safer systems to the greatest extent feasible; use formal techniques to evaluate the effectiveness of process safeguards to drive risk to as low as reasonably practicable (ALARP); and perform damage mechanism hazard reviews to ensure corrosion hazards are accurately identified before accidents occur.

Furthermore, the Working Group report recommends requiring companies to complete root cause analyses after significant accidents or releases, to explicitly account for human factors and organizational changes, and to perform periodic safety culture assessments.

Finally, the report indicates California will continue to pursue broader regulatory reforms, including the “safety case” system.

California is also in the process of tripling its force of specialized refinery safety inspectors, an initiative that is essential for the success of any regulatory system. We have made similar recommendations to federal OSHA, but they have taken only small steps.

On January 30, 2014, the CSB released a draft final report on the April 2010 fatal explosion and fire at the Tesoro refinery in Anacortes, Washington. The report found that the incident was

caused within a heat exchanger, by a damage mechanism known as “high temperature hydrogen attack” or HTHA, which severely cracked and weakened carbon steel tubing leading to a rupture. The draft report proposes far-reaching recommendations to the federal Environmental Protection Agency, the Governor, and State Legislature of the State of Washington to more rigorously protect workers and communities from potentially catastrophic chemical releases. The accident at Tesoro could have been prevented had the company applied inherent safety principles and used HTHA-resistant materials to prevent the heat exchanger from cracking. This accident is very similar to the one that occurred at the Chevron refinery where corroded piping failed catastrophically. The company was made aware of the corrosion, but didn’t take the necessary steps to replace piping with inherently safer, corrosion-resistant materials. As a result, 19 refinery workers lives were endangered and more than 15,000 California residents sought medical attention at hospitals. Companies must do a better job of preventing refinery accidents, which occur all too frequently. At both Tesoro and Chevron, warning signs were ignored over many years, and opportunities to prevent accidents by implementing inherently safer designs were missed. Our investigations have concluded that fundamental changes are needed. Our board tracked 125 significant refinery incidents in 2012 alone. Chemical Safety Board investigations show state and federal regulators are not able to ensure safety at refineries. They are under-resourced, outgunned by a powerful industry that seeks to blunt and sometimes even roll back the already inadequate regulatory system in the U.S. Freedom Industries I will now discuss the CSB’s activities in Charleston, West Virginia – specifically in relation to the release of hazardous chemicals into the water supply of about 300,000 residents in nine counties. First, I think it is important to discuss the history that the CSB has had investigating accidents in West Virginia’s Kanawha Valley, a center of the state’s chemical enterprise. This is our third deployment to a major chemical incident in the valley. In 2008 two workers were fatally injured at the Bayer CropScience chemical plant in Institute, West Virginia, when a waste tank containing the highly toxic pesticide methomyl violently exploded. Then in 2010, three incidents occurred in a thirty-three hour period at the DuPont facility in Belle. There was a release of highly toxic phosgene, which exposed a veteran operator and resulted in his death less than one day later. Following the CSB’s investigation into the Bayer and DuPont incidents the board recommended that the county, working with the state, establish a hazardous chemical release prevention program to enhance safety and optimize emergency response. The CSB recommended that the health department establish an industrial safety authority, paid for using fees assessed on the companies processing or handling potentially dangerous chemicals. As an example, we cited the program in California's Contra Costa County, which has an equally dense industrial/chemical

base. Although this was not immediately adopted in West Virginia, the legislature there is now considering this approach in the wake of the Freedom Industries incident. The CSB’s previous recommendations in West Virginia were aimed at empowering a government agency to determine just what posed a high hazard. Perhaps qualified inspectors would have considered pre-World War II vintage chemical storage tanks, located just one and one-half miles upstream from the intake of a public drinking water treatment plant, to be potentially “highly hazardous” and worthy of a closer look. All of us here today are all too aware of the recent events that occurred at Freedom Industries. On January 9, 2014, a 46,000-gallon steel tank experienced a leak of up to 10,000 gallons of crude 4- methylcyclohexane methanol (MCHM) with an estimated 5.6% PPH, a poly glycol ether. A significant amount of the chemical was released into the Elk River, a tributary to the Kanawha River. The CSB’s preliminary research indicates that there is a gap in the regulatory framework covering aboveground chemical storage tanks. In October of 2013, at the request of the company, Tank Engineering and Management Consultants performed a review of the tank terminals located in Charleston and Nitro. The evaluation was conducted and approved by an API-653 and 570 certified inspector, who also was credentialed as a National Association of Corrosion Engineers (NACE) Certified Corrosion Technologist. The review notes that the substances stored in tank 396 are considered “non hazardous” by the Environmental Protection Agency and are therefore not regulated by the federal Spill Prevention Control and Counter Measure Program, or SPCC rule. The review further notes that the tanks have “been maintained to some structural adequacy but not necessarily in full compliance with API-653 or EPA standards.” API-653 is considered the prevailing voluntary good practice for aboveground storage tank (AST) inspection, repair, alteration and repair, and was developed to establish a uniform national program that assists state and local governments in AST regulations. API 653 covers basically every age related damage mechanism known, including but not limited to corrosion, brittle fracture and improper fabrication. While EPA’s SPCC rule outlines requirements for prevention and preparedness of oil discharges such regulations do not apply to tanks containing “non hazardous substances” like those found at Freedom Industries. Under existing state and federal laws these tanks, including tank 396, were not regulated by the state or federal government. Moving forward the CSB will closely examine tank 396. We plan to complete a thorough internal inspection of the tank to determine the tank’s condition and wall thickness at the time of the incident. We will also examine tank design, materials of construction, inspection practices, state and federal oversight of similar tanks as well as existing industry best practices. The tanks in use at Freedom Industries were over one-half century old. Considering the best way to improve the safety of tanks at facilities that have similar tanks in use is an important issue that needs to be addressed.

In addition to looking at the causes of the tank failure itself, the CSB team will also examine the response to the leak once it was discovered. We are particularly interested in the adequacy of information on MCHM and PPH hazards since the manufacturer’s material safety data sheet repeatedly says “no data available” for numerous toxicological properties, especially chronic toxicity. Having information readily available for the public is an issue we will be further examining in regard to ongoing reform of the Toxic Substances Control Act. Emergency responders, local officials, regulators and public utilities must be provided the proper information in order to protect the community from potential risks, and more than providing information, there needs to be an obligation to require preventative measures. I would like to also take this opportunity to strongly commend Senator Manchin, Senator Rockefeller and Senator Boxer for promptly introducing legislation aimed at safeguarding water supplies from chemical leaks. Modern standards are strongly needed in this area. I encourage any effort, any legislative reform to follow the basic framework of accident prevention, known as the hierarchy of controls – which is an effectiveness ranking of techniques used to control hazards and the risk they represent. The further up the hierarchy, the more effective the risk reduction achieved. In brief, the most effective accident prevention measures typically involve what is called inherent safety. I realize this is a term that has drawn some controversy, but it is really just a well-established industry- developed concept that focuses on prioritizing the elimination of a hazard, or minimizing it. And, it looks to inherently safer chemical processing and equipment design. For chemical storage tanks like this, the first question that should always be asked is, do they need to be near the water supply for some reason? Unfortunately in the case of Freedom Industries, the answer would have been “no.” The facility was simply a truck terminal, and its position alongside the Elk River just upstream of the water intake had tragic consequences. The facility just did not need to be where it was. And although relocating it would have had some costs, those pale beside the costs that hundreds of thousands of West Virginia residents and businesses are now paying for this disaster. Another form of inherent safety, or safety in design, is using corrosion-resistant materials for tank construction. That is something we will need to explore further, as we determine the failure mode for this particular tank. Moving down the hierarchy are engineering solutions that don’t eliminate the risk of an accident but make it far less likely. These may include double-walled tank designs, leak detection systems, and secondary containment structures like dikes and liners. A large segment of the industry has moved in this direction over the many decades since the Freedom Industries tanks were constructed. Finally near the bottom of the hierarchy are measures such as inspections for corrosion or other potential failure mechanisms. Now, inspections are absolutely essential in any sort of hazardous process operation or storage site. But I would caution that, according to the hierarchy of controls, they are among the least effective of safeguards. Hazards can be missed in inspections – we see that frequently at the CSB. The effectiveness of inspections totally depends on the skill and thoroughness of the inspector. And of course, there can be significant time intervals

between inspections, and bad things can happen during those periods. So inspections are essential, but they are not a complete solution by any means. What is needed – and what I hope this legislation leads to – is a holistic approach to preventing these incidents. West Fertilizer The CSB has determined that ammonium nitrate fertilizer storage falls under a patchwork of U.S. safety standards and guidance – a patchwork that has many large holes. These holes include: the use of combustible wooden buildings and wooden storage bins, sprinklers are generally not required, and no federal, state, or local rules restrict the storage of large amounts of ammonium nitrate near homes, schools and hospitals. A joint chemical advisory issued in August of 2013 by OSHA, EPA and ATF entitled Safe Storage, Handling, and Management of Ammonium Nitrate is an excellent step forward in addressing the hazards associated with the storage of AN, but the current regulatory coverage is still in need of reform. Fire codes have some useful provisions for ammonium nitrate. But they need significant revision to strengthen the storage requirements for AN. Even if they were revised, we note that Texas and most of its counties have no fire code. So at West, these fire code provisions were strictly voluntary, and West Fertilizer had not volunteered. Almost a year later Texas and its rural counties have not adopted a fire code. OSHA has some similar provisions for ammonium nitrate fertilizer in its Explosives standard, 1910.109. However, OSHA has not focused extensively on ammonium nitrate storage and hadn’t inspected West since 1985. It appears that few if any retail fertilizer operations have ever been cited under this standard, and its provisions for fire protection are less rigorous than those followed overseas for AN. Other nations have gone much further than the U.S. on ammonium nitrate safety. The UK recommends dedicated, noncombustible storage buildings and noncombustible bins. The U.S. manufacturer, CF Industries, recommends the same and urges sprinklers as well. But the fertilizer industry tells us that U.S. sites commonly store ammonium nitrate in wooden buildings and bins – even near homes, schools, or other vulnerable facilities. This situation must be addressed. Preventing the risk of fire essentially eliminates the potential for an explosion as we saw in West, by removing one of the preconditions for detonation. Facilities like West fall outside existing federal process safety standards, which were developed in the 1990’s and are list-based. Ammonium nitrate would likely have been included, if the EPA had adopted our 2002 recommendation to cover reactive chemicals under its Risk Management Program. Williams Olefins

The Williams plant has over a hundred workers, producing ethylene and propylene. On June 13, there was a catastrophic failure involving a heat exchanger and associated piping which broke loose from a distillation tower. The ensuing explosion led to the deaths of two employees. The CSB found that the 46-year old heat exchanger did not have adequate pressure relief and over-pressured, possibly due to problems with the materials of construction. In collaboration with the company and OSHA the CSB has concluded its first round of metallurgical testing on the exchanger metal. We’ll be looking at whether inherently safer materials of construction should and could have been used in preventing this accident. The CSB plans to publicly release a report on this testing in the next few months. The CSB investigation is also looking into potential failures of regulatory enforcement at the Williams plant as well as industry standards and regulations. Process safety management systems at Williams are being examined and will be included in the final report. Concluding Remarks The bigger picture in process safety is that EPA and OSHA resources are under duress. Regulations need to be modernized – but more inspection and prevention are needed as well. In the meantime, I hope that the committee will find recent developments in California extremely encouraging. California’s decision to triple the number of dedicated process safety inspectors – funded by industry fees – is an extremely progressive and important step to ensuring a well funded regulator. Another promising approach is the “safety case”– successfully used by the nuclear and aerospace sectors in the United States and by European countries in the refinery sector – which insurers say have much lower petrochemical accident rates than we do. Many experts believe this is the best safety regime for complex, technological industries, rather than the U.S. system which calls upon a prescriptive and often outdated rule book that is incapable of adapting to new technology and identified hazards, until the next catastrophic incident occurs. Thank you again for the opportunity to testify today.

FD06472 | 2014_美国_al-solutions-fatal-dust-explosion.pdf

分类:06_境外及港澳台调查报告 | 年份:2014 | 地域: | 严重程度: | 场所: | 起火原因: | 来源格式:pdf

CSB • AL Solutions Case Study 1 AL Solutions Case Study Final Investigation Report July 2014 Case Study U.S. Chemical Safety and Hazard Investigation Board AL Solutions, Inc., New Cumberland, WV Metal Dust Explosion and Fire December 9, 2010 Three Killed, One Injured No. 2011-3-I-WV This case study examines a metal dust explosion and fire at the AL Solutions facility in New Cumberland, West Virginia. The incident resulted in three employee fatalities and one contractor injury. The explosion and ensuing fire damaged the production building and ultimately caused the shutdown of the plant. KEY ISSUES • Federal Combustible Dust Oversight • Hazard Recognition and Training • Learning from Previous Incidents INSIDE • Introduction • Process Discussion • Incident Discussion • Analysis • Previous CSB Dust Reports • Key Findings • Recommendations

CSB • AL Solutions Case Study 2 AL Solutions Case Study Final Investigation Report July 2014 DEDICATION This case study is dedicated to the three men who lost their lives as a result of the AL Solutions incident on December 9, 2010. James Eugene Fish Jeffrey Scott Fish Steven Swain

CSB • AL Solutions Case Study 3 AL Solutions Case Study Final Investigation Report July 2014 1.0 INTRODUCTION 1.1 AL SOLUTIONS, INC. AL Solutions processes titanium and zirconium scrap metal into pressed compacts1 that aluminum producers use as alloy additives. AL Solutions obtains scrap from titanium and zirconium manufacturers, and the end user adds the pressed compacts to furnaces or molten metal to increase the strength of aluminum alloys. In 2006, AL Solutions purchased Jamegy, Inc., a metal producer based in New Cumberland, West Virginia. Jamegy founded the New Cumberland facility and operated it before AL Solutions. At the time of the incident, AL Solutions owned and operated two processing facilities. The primary office and production facility was located in New Cumberland, West Virginia. AL Solutions also has a facility for milling in Washington, Missouri. In 2010, AL Solutions employed 23 workers at the New Cumberland facility and two at the Washington facility. After the 2010 incident, AL Solutions constructed a new manufacturing facility in western Pennsylvania, projected to be fully operational by 2015. 1.2 FACILITY DESCRIPTION The New Cumberland facility (shown in Figure 1) lies on the east bank of the Ohio River in the Northern Panhandle of West Virginia, approximately 40 miles west of Pittsburgh, Pennsylvania. The New Cumberland site contains a main production facility (now idle), warehouse, outside storage area, laboratory, and office area.2 1 AL Solutions compacts are densely compressed titanium and zirconium pucks (or disks) measuring approximately 3 inches in diameter and 1 to 2 inches in thickness. The compacts vary in size and weight, depending on customer specifications. 2 As of the publication date of this case study, production at the New Cumberland facility remains idle as a result of the 2010 incident. Warehousing and office activities still take place at the facility. FIGURE 1 Overhead View of AL Solutions New Cumberland Facility Before the 2010 Incident (photograph courtesy of Google Earth) TABLE OF CONTENTS 1.0 Introduction 3 2.0 Process Discussion 4 3.0 Incident Discussion 6 4.0 Analysis 8 5.0 Industry Code and Standards 16 6.0 Regulatory Analysis 18 7.0 Previous CSB Dust Reports 22 8.0 Key Findings 23 9.0 Reiterated Recommendations 24 10.0 Recommendations 24

Appendix A 25

Appendix B 26

Appendix C 29

CSB • AL Solutions Case Study 4 AL Solutions Case Study Final Investigation Report July 2014 The New Cumberland production facility operated 24 hours a day, 7 days a week, and contained processing equipment for metal milling, blending, pressing, and water treatment. Separated from the warehouse and office area by an access road, the production building was the site of the December 2010 explosion. 2.0 PROCESS DISCUSSION A variety of suppliers shipped scrap titanium and zirconium to AL Solutions in 55-gallon drums (Figure 2). The metal typically arrived packed in water, but it also was packaged with salt or an inerting agent, such as argon gas, to reduce the risk of explosion during transit. AL Solutions took the raw material from the drums and milled it for several hours in a batch (or lot) while submerging it under water. During milling, a blade reduced the metal particle size and removed the oxide surface layer of the raw material. When milling was completed, operators decanted3 the water and some fine metal particulates (known as fines) and then sent the water to treatment tanks (Figure 3). The milled metal was transferred from the milling tank and screened to remove any large solids. These solids were either returned to the mill for further size reduction or discarded. Operators placed the milled and screened metal in tubs and then vacuumed excess water into water treatment tanks. Next, operators blended the metal to ensure uniform composition in the lot. Once the material met the laboratory specifications, it proceeded to the hydraulic presses. The blended material was pressed into 3-inch-diameter compacts (Figure 4). At the time of the incident, one press was used to press zirconium compacts, and two presses were used for titanium compacts. An oven dried the compacts to remove any remaining water. The laboratory analyzed the density and percent moisture of two compacts from each dryer lot before the compacts were wrapped in aluminum foil and sent to the customer. FIGURE 2 Sample of Titanium Raw Material 3 Decanting is a process that removes a liquid or solution from a vessel while leaving any solids undisturbed. FIGURE 3 Simplified Process Flow Diagram of Press Operations at the New Cumberland Facility

CSB • AL Solutions Case Study 5 AL Solutions Case Study Final Investigation Report July 2014 On a typical shift, four operators worked in the production building: two press operators, one blender operator, and the shift supervisor. The shift supervisor was in charge of the mill and water treatment. Another operator worked in the warehouse to dry and wrap the compacts. During the day, the plant manager and an engineer responsible for operations were onsite to assist with any operational issues. During the day shift, two laboratory workers analyzed the blended samples and created recipes for the blenders. 2.1 TITANIUM Titanium (symbol Ti) is a widely used metal with unique flammability characteristics. Fine titanium particulates are easily ignited in air and can ignite spontaneously at elevated oxygen concentrations or high pressures.4 According to the Hazardous Materials Identification System (HMIS),5 titanium fines and powders have a flammability hazard rating of 3 or 4 (on a scale of 0 to 4, with 4 the highest hazard).6 The AL Solutions titanium swarf7 materials safety data sheet (MSDS) states that titanium particles dispersed in a cloud can explode.8 The MSDS recommends having procedures in place to keep the powder away from static discharges, sparking equipment, and other ignition sources. Class D sodium chloride extinguishers are intended for use on combustible metal fires involving titanium and zirconium. The MSDS also states that large quantities of water can be used to quench small titanium fires but water should not be used on large fires because water can react with the burning metal at high temperatures to produce explosive hydrogen gas. Titanium powder has low toxicity, but excessive inhalation can cause respiratory irritation or acute respiratory distress. The primary route of exposure is inhalation and ingestion, especially during processes that produce metal particulates. 2.2 ZIRCONIUM The metal zirconium (symbol Zr) also carries a significant flammability hazard. Zirconium particulates have an HMIS flammability hazard rating of 3 or 4 (on the scale of 0 to 4), and small particle-sized material (with less than 2% moisture)9 can autoignite in air at room temperature. According to the AL Solutions zirconium MSDS, dust clouds with very small concentrations of zirconium (less than 100 g/m3) are explosible. The MSDS recommends FIGURE 4 Samples of Zirconium Compacts 4 DOE Handbook: Primer on Spontaneous Heating and Pyrophoricity; DOE-HDBK-1081-94; U.S. Department of Energy: Washington, DC, December 1994. 5 HMIS is a hazardous materials rating system developed by the American Coatings Association to identify health, flammability, and physical hazards associated with chemicals. The hazard ratings are similar, but not identical, to National Fire Protection Association (NFPA) ratings. 6 Under the HMIS rating system, a flammability hazard rating of 3 is assigned to materials capable of ignition under almost all normal temperature conditions. 7 Swarf is a waste product of machining titanium and consists of fine ribbons and particles of titanium in a steel wool–like form. Pape, Ronald; Schmidt, Fredick. Fires and Explosions: Combustibility Analysis of Metals. Advanced Materials and Processes 2009, 167 (11/12), 41. 8 Titanium metal can be explosive if the particles can pass through a 100-mesh sieve (that is, less than 150 microns) and are suspended at a concentration greater than or equal to approximately 43 g/m3. Titanium; MSDS AL Solutions: New Cumberland, WV. 9 Zirconium particulate ignition data are available in several sources. (1) Cooper, Review of Zirconium-Zircaloy Pyrophoricity; Rockwell International Report; Rockwell International:1984. (2) Matsuda,Yashima, Ignition Characteristics of Zirconium Dust; Japanese National Institute for Industrial Safety Report; Japanese National Institute for Industrial Safety: Japan, 2000. (3) NFPA 484: Standard for Combustible Metals; National Fire Protection Association (NFPA): Quincy, MA, 2012 and references therein.

CSB • AL Solutions Case Study 6 AL Solutions Case Study Final Investigation Report July 2014 keeping the powder wet to avoid explosion hazards. If zirconium metal particulates ignite, the MSDS advises letting the material burn out and not fighting the fire; the MSDS also notes that fires in wet metal zirconium fines can result in an explosion. The MSDS recommends keeping zirconium fines either extremely dry (less than 5 percent water) or extremely wet (more than 25 percent water). Spontaneous explosions of moist, finely divided zirconium scrap have occurred during handling.10 Zirconium powder can cause respiratory and digestive irritation if inhaled or ingested. 3.0 INCIDENT DISCUSSION 3.1 OPERATIONS AT THE TIME OF THE INCIDENT Around noon on the day of the incident, the day shift operators returned to work from lunch. Two operators were running the three presses making titanium and zirconium compacts, and another operator was at the blender, mixing a batch of zirconium. The shift supervisor was changing the mill blade in the adjacent milling room. Three electrical contractors were also onsite, running conduit in a hydraulic room adjacent to the blending and press room. These contractors were performing preparatory work for a maintenance outage planned for the next day. 3.2 INCIDENT DESCRIPTION At about 1:20 p.m., immediately before the explosion, an electrical contractor located about 6 feet outside a partially open door heard a loud noise that he characterized to U.S. Chemical Safety and Hazard Investigation Board (CSB) investigators as a “metallic failure … like something popped … or fell.” He then heard a “woof ... just how you’d light your gas grill” and “a big boom.” The shift supervisor in the mill room heard a loud bang and seconds later noticed an orange glow or flame coming from the blending and press room. At about the same time, a second electrical contractor working in the hydraulic room heard an explosion in the neighboring blending and press room and then saw a fireball moving rapidly into the hydraulic room through the blending and press room door. The fireball burned his head, neck, arms, and hand as he exited the production building. The third electrical contractor was in the restroom, where he heard “an angry noise,” felt a strong wind enter through a door, and then saw orange sparking flame at the ceiling. The shift supervisor told CSB investigators that he noticed the “air was sparking” after the explosion. He had previously experienced this phenomenon at AL Solutions and knew that it signified airborne metal was burning. After the explosion, the supervisor ran outside and around the production building. At about this time, employees in the main office building, who heard the explosion, called 911 to request emergency assistance. The plant manager was walking from the warehouse to the production building at the time of the explosion and witnessed the event. Some employees and contractors reported hearing a second explosion minutes after the initial explosion, which might have been caused by a propane tank rupture from a forklift inside the building. The explosion and fire severely burned the zirconium press operator. The supervisor, an electrical contractor, and the plant manager provided aid to the press operator until emergency personnel arrived. During this time, employees realized that two other operators were missing and presumably in the burning building. 10 DOE Handbook: Primer on Spontaneous Heating and Pyrophoricity; DOE-HDBK-1081-94; U.S. Department of Energy: Washington, DC, December 1994, p 30.

CSB • AL Solutions Case Study 7 AL Solutions Case Study Final Investigation Report July 2014 A nearby volunteer firefighter heard the explosion and immediately proceeded to the scene. The New Cumberland Volunteer Fire Department (VFD) arrived minutes later (as depicted in Figure 5). At approximately 2:30 p.m., an airlift transported the injured contractor to a hospital. By the time the VFD arrived, the building water deluge system had activated. The firefighters attempted to access the building through the office, but the fire was too intense, and they could not enter. Upon entering the original explosion area, firefighters discovered two deceased operators at the inside locations indicated in Figure 6. The two operators in the blending and press room died at the scene, and the zirconium press operator died three days following the incident from severe burn injuries. The explosion and subsequent fire caused minor blast damage to doors, walls, and interior windows as well as more substantial thermal damage throughout the production area (illustrated in Figure 7). The explosion caused thermal damage to the wall and overhead ceiling area adjacent to the blender (shown in Figure 8). Equipment damage included a lift truck, the blender, and the press feed conveyor. The explosion propelled papers, desks, and lockers from the office into the parking lot outside of the production building. FIGURE 6 Main Production Building Layout, Likely Initiation Point of the Incident, and Worker Injury and Fatality Sites FIGURE 5 Production Building Exterior, with Firefighters on Scene (photograph courtesy of the New Cumberland Police Department).

CSB • AL Solutions Case Study 8 AL Solutions Case Study Final Investigation Report July 2014 4.0 ANALYSIS CSB investigators observed and documented the production building after the incident and concluded that the fire damage and deformations caused by the explosion overpressure were consistent with a metal dust explosion. Most solid organic materials (and many metals and some nonmetallic inorganic materials) will burn or explode if finely divided and dispersed in sufficient concentrations. Even seemingly small quantities of accumulated dust can cause catastrophic damage.11 Like all fires, a dust fire occurs when fuel (the combustible dust) is exposed to energy (an ignition source) in the presence of oxygen (typically from air). Removing any one of these elements of the classic fire triangle (depicted in Figure 9) eliminates the possibility of a fire. A dust explosion requires the simultaneous presence of two additional elements: dust dispersion and confinement (as shown in the dust explosion pentagon in Figure 9). Suspended dust burns rapidly, and confinement enables pressure buildup. Removal of either the suspension or the confinement element can prevent an explosion, although a dust fire can still occur. FIGURE 9 Classic Fire Triangle and the Dust Explosion Pentagon FIGURE 7 (LEFT) North End of Blending and Press Room FIGURE 8 (RIGHT) Ceiling in Blending and Press Room 11 Combustible Dust Hazard Study; U.S. Chemical Safety and Hazard Investigation Board: Washington, DC, 2006.

CSB • AL Solutions Case Study 9 AL Solutions Case Study Final Investigation Report July 2014 4.1 EXPLOSION ORIGIN Metal particulates or dusts can produce a flash fire or explosion, using metal as the fuel and air as the oxidizer. As metals become finely divided in milling, blending, or crushing operations, freshly exposed surfaces on the fines or dust particles can become highly reactive. Finely divided metals such as titanium and zirconium can become pyrophoric12 and spontaneously combust in air.13 The AL Solutions explosion likely initiated when particulates ignited in the blender that was processing zirconium. Sparks or heat produced by metal-to-metal contact between the blender blades and the blender sidewall ignited the zirconium. Mechanical impacts, such as the blender blades against the sidewall, can produce potential ignition sources where metal- to-metal contact occurs. In rotating machinery, repeated impacts can result in hot spots with temperatures high enough to result in ignition.14 The pre-explosion sound of metal failure or popping reported by AL Solutions employees likely originated in the blender, which showed evidence of the most substantial metal deformation after the incident. Both endwalls were deformed inward and had visual indications of the blade scraping or scoring on the wall (Figure 10). Residual burned zirconium was detected in the blender beneath the shaft. Severe burn damage was also seen in the press on the other side of the production room (shown in Figure 11) and there were indications of two adjacent cracks in one of the blender sidewalls. Investigators examined the production building wall and ceiling adjacent to the blender and found visual evidence of a burning dust cloud projected upward toward the ceiling (displayed in Figure 12). Investigators examined the production building wall and ceiling adjacent to the blender and found visual evidence of a burning dust cloud projected upward toward the ceiling (displayed in Figure 12). AL Solutions employees noted mechanical problems with the blender in the days before the explosion. Blender paddles were striking the sidewall of the 12 Pyrophoric materials are substances that ignite instantly when exposed to oxygen. They can also be water-reactive, producing heat and hydrogen. 13 Pape, Ronald; Schmidt, Fredick. Fires and Explosions: Combustibility Analysis of Metals. Advanced Materials and Processes 2009, 167 (11/12), 41. 14 Eckhoff, Rolf K. Dust Explosions in the Process Industries; 3rd Ed.; Elvsevier Science: Burlington, MA, 2003; p 64. FIGURE 12 Blender and the Adjacent Wall and Ceiling FIGURE 10 (LEFT) Zirconium Blender Wall Deformation and Scoring (circled) FIGURE 11 (RIGHT) Press Blade Damage

CSB • AL Solutions Case Study 10 AL Solutions Case Study Final Investigation Report July 2014 blender and scoring the housing. To address these problems, maintenance personnel adjusted the blender blades to increase clearance from the blender wall, but this action did not permanently address the issue with the metal-to-metal contact. When the problem returned, maintenance personnel decided to replace parts of the blender in an effort to resolve the issue. While the operators were disassembling the blender, they discovered a large groove cut in the shaft and an 8-inch to 12-inch crack in the sidewall of the blender, most likely caused by the paddle blades scraping the sidewall. The maintenance worker welded this crack, and operators continued to use the blender. On the morning of the incident, an operator requested that maintenance replace a worn paddle in the blender. A maintenance employee retrieved a paddle from an old blender and attached it to the blender in the production building about two hours before the incident. All of the maintenance performed on the blender only temporarily addressed the problems caused by the metal-to-metal contact, such as the scoring on the sidewall and worn paddles. AL Solutions did not repair or replace the blender to avoid exposing combustible metal dusts to sparks or heat produced by the mechanical impact from the paddles. On the basis of production operations at the time of the incident, the blender likely contained a substantial quantity of zirconium. Indications of burned residue and char on the ceiling above the blender (shown in Figures 7 and 8) and the presence of burning deposits on the wall behind the blender suggest that the burning zirconium particulates lofted from the blender after the initial explosion, engulfing the room in fire. After the incident, the blender lid, intended to be closed during production, was found left in the open position. The scraping of the blender blades against the sidewalls of the blender likely ignited the zirconium powder early in the incident sequence. The cloud of combustible zirconium resulted in a deflagration.15 Hot gases expanded, producing the “woof” or “wind” observed by two witnesses. The burning zirconium dust cloud also ignited open drums and tubs of titanium and zirconium at several locations in the production building, propagating the fire. 4.1.1 CSB Combustible Dust Testing The CSB commissioned combustible dust testing of materials from the AL Solutions facility to determine whether the metal powder contributed to the fire and explosion. CSB investigators collected titanium and zirconium particulate samples for testing, both from drums of raw (received) materials and from in-process materials stored in drums. The testing determined that zirconium and titanium samples in use at AL Solutions were combustible and could produce a fire or metal dust deflagration. These results are consistent with other industry tests of small particle titanium explosibility.16 The samples were first analyzed for metal composition, moisture content, and particle size and shape. The results for metal composition are shown in Figure 13. Other materials were present in the samples, but the results of the metal composition test are as expected based on MSDS information and AL Solutions batch recipes. 15 A deflagration is the combustion of a fuel-air mixture that occurs with a flame propagating through the mixture at a speed less than the speed of sound. Most dust explosions and flash fires are deflagrations. 16 Boilard, S.P., Amyotte, P.R., Khan, F.I., Dastidar, A.G. and Eckhoff, R.K., “Explosibility of Micron- and Nano-Size Titanium Powders”, Journal of Loss Prevention in the Process Industries, 26, 1646-1654 (2013).

CSB • AL Solutions Case Study 11 AL Solutions Case Study Final Investigation Report July 2014 Ti Samples Percent Weight (%) Zr Samples Percent Weight (%) Zirconium 0.4 96.0 Titanium 93.5 1.5 Vanadium 4.5 0.2 Iron 0.6 1.0 Other Metal 1.0 1.3 Explosibility testing of the samples collected at AL Solutions showed that some of the titanium and zirconium dusts were combustible (Appendix A).17 The dust samples listed in Figure 14 were all found to be combustible, and the zirconium sample meets the characteristics of Class II combustibility. Combustible dust is dust that will burn and Class II combustible dusts possess a higher explosion severity ratio.18 The Occupational Safety and Health Administration (OSHA) requires dust-ignition-proof electrical equipment where Class II combustible dusts are present. The AL Solutions production building equipment had ignition-proof enclosures on motors and electrical wiring to prevent dusts in the production atmosphere from igniting because of electrical arcs and heat produced by moving parts or mechanical impacts. The metal-to-metal contact occurring in the blender posed a similar hazard, and it was open to the production atmosphere, where combustible dusts were present. Dust Sample Classification Titanium #1 Combustible, but not Class II Titanium Mixture Class II Combustible Zirconium Crush Pellet Combustible, but not Class II 4.2 AL SOLUTIONS DUST MANAGEMENT PRACTICES CSB investigators learned through interviews that AL Solutions employees were generally aware that the metal dust was combustible and that a spark on the metal could cause a fire. In 2007, AL Solutions hired a laboratory to conduct burning rate testing19 on samples of zirconium and titanium scrap, sludge, and fines. The testing indicated that zirconium sludge and titanium scrap would propagate combustion and have a burning rate high enough to be considered “ignitable.”20 The AL Solutions safety manual listed several requirements for safe storage and handling of titanium and zirconium. However, the CSB found that management did not enforce these requirements. AL Solutions and the previous owner designed and installed production FIGURE 13 Sample Metal Composition FIGURE 14 Dust Combustibility Testing Results 17 This result is based on the Class II test for explosion severity: (1) National Materials Advisory Board (NMAB). Classification of Combustible Dusts in Accordance with the National Electrical Code; NMAB 353-3-80; NMAB: 1980. (2) ASTM. Go/No-Go Test for Combustibility; ASTM E1226; ASTM: West Conschohocken, PA, 2009. 18 Class II combustible dusts have an explosion severity ratio greater than or equal to 0.5 or ignition sensitivity ratios greater than or equal to 0.2. From NMAB 353-3-80 “Classification of Combustible Dusts in Accordance with the National Electrical Code” 19 U.S. Environmental Protection Agency (EPA). Test Methods for Evaluating Solid Waste, Physical/Chemical Methods; EPA-SW-846; U.S. Government Printing Office: Washington, DC; 1996. See Method 1030. 20 Ignitable solids can create fires under certain conditions and are spontaneously combustible with a flash point less than 60°C (140°F). The term ignitable is typically used to refer to solid hazardous wastes. U.S. Environmental Protection Agency (EPA). Test Methods for Evaluating Solid Waste, Physical/Chemical Methods; EPA-SW-846; U.S. Government Printing Office: Washington, DC; Third Edition.

CSB • AL Solutions Case Study 12 AL Solutions Case Study Final Investigation Report July 2014 equipment with enclosures intended to limit the accumulation of combustible metals on external surfaces. The blender and the press conveyor had metal lids, and the plan was to leave the lids closed whenever possible to isolate the equipment and prevent dispersion of dust. Management did not enforce this practice at the facility, and the blender, conveyor belt lid, and storage drums were regularly left open during operation. In addition, to limit the quantity of flammable metal in the blending area, only metal currently in production was to be allowed in the production area. All other material was to be kept in a separate warehouse or in outside storage. However, AL Solutions employees commonly left barrels of titanium and zirconium in the production building, even if they were not in use (illustrated in Figure 15). AL Solutions also did not enforce industrial hygiene practices related to handling metal dusts, although this lack of action was not causal to the incident. The AL Solutions titanium and zirconium MSDSs recommended using a high-efficiency particulate respirator when handling the materials, but management did not enforce the requirement. 4.2.1 Controlling Dust Accumulations AL Solutions management had procedures in place to remove dust and to control fire and explosion hazards at the facility. Operators used spark-resistant tools and wore 100 percent cotton clothes, which, although not flame resistant, were intended to reduce the risk of sparks from metal-to-metal contact or static electricity. No open flames were allowed in the production building, and all smoking was restricted to an area outside the break room. The electrical equipment in the production building was designed to reduce the chance of an explosion. Motors in the production room were designed to not provide an ignition source for any metal present. AL Solutions regularly washed down the equipment with water as its primary means to eliminate dust from process equipment and areas. This approach was intended to keep the metal powder damp and to remove any accumulated powder on process surfaces. All process equipment, walls, and floors were intended to be washed at regular intervals with the hoses available in the production building. AL Solutions expected operators to clean FIGURE 15 Drums of Titanium and Zirconium Particulates near Blender

CSB • AL Solutions Case Study 13 AL Solutions Case Study Final Investigation Report July 2014 their areas and equipment at the end of every shift, whenever any metal accumulated, or when any equipment was changing from handling titanium to processing zirconium. Operators washed metal powder to the floor and then into troughs that ran along the floor of the production building, and they cleaned these troughs weekly. AL Solutions did not use a dust collection system to remove zirconium and titanium dusts generated during processing, as recommended by industry standards for the safe handling of combustible metal dusts and powders (discussed in Section 5.0). AL Solutions instead relied on the use of water as the only method to eliminate dust fires and explosions by keeping dust moist and avoiding dust accumulation on equipment and flat surfaces. In the event of a metal fire, the AL Solutions safety manual instructed operators to evacuate the building, alert management, and call the fire department. The AL Solutions Emergency Plan recommended that employees avoid fighting metal dust fires with fire extinguishers, but noted that operators could attempt to fight nonmetal incipient fires with a fire extinguisher. The AL Solutions facility was not equipped with Class D fire extinguishers appropriate for fighting metal fires, so the company instructed its personnel to let metal fires burn and wait for the fire department. 4.2.1.1 Water Deluge System The main production building had a water deluge system that was set to activate upon detection of high temperatures or high concentrations of hydrogen gas. Sensors located in the blender and press feed belt conveyor system would activate the deluge of water if readings reached a designated alarm point (illustrated in Figure 16). Operators also could manually activate the deluge system by turning a valve located in the blending and press room. 4.2.1.2 Safety Audits The CSB found that facility safety and insurance audits did not adequately identify and address metal dust hazards at the New Cumberland facility. Jamegy, the previous owner of the facility, engaged a consultant to conduct a risk assessment of the Jamegy titanium process in 1998 and 2006. The purpose of the risk assessments was to identify events that could cause fatalities or major equipment damage at the site. Fires and explosions due to titanium or zirconium dust ranked among the major events considered during these assessments. In both 1998 and 2006, the consultant recommended that Jamegy acquire an automatic fire control system for the blender and press equipment to augment the water deluge system on the ceiling of the production building. Both risk assessments also recommended audits to address the accumulation of metal powder in the press and blender area. Although the risk assessments considered the risk that water pouring onto burning metal could generate an explosion, the consultant made no recommendations to address the presence of the automatic water deluge fire suppression system in the production area. The AL Solutions property risk insurer conducted insurance audits at the AL Solutions facility in 2008 and 2009. These insurance audits recognized the hazards posed by titanium and zirconium dust. However, the resulting audit reports show that the insurance FIGURE 16 Hydrogen Sensing Port at the Top of the Press 2 and 3 Conveyor Belt (post incident)

CSB • AL Solutions Case Study 14 AL Solutions Case Study Final Investigation Report July 2014 companies considered the AL Solutions dust control methods of washing down the metal powder to be acceptable. The 2008 audit commended the facility on its “wet process producing no dust.” The 2009 audit declared that incidents are effectively controlled by “good housekeeping,” “established raw material storage practices,” and “water added during manufacturing process to control dust.” The fire protection system is also mentioned as good process control, despite the fact that it is not advisable to use water to fight a titanium or zirconium fire. The audits reference a 2006 incident (summarized in Section 4.3.3) when metal dust ignited inside a milling tank at the New Cumberland facility. The audits address the changes made to the milling tank after this incident, but they do not mention what (if any) changes were implemented to reduce the risk of metal dust ignition. Neither of the insurance audits made any recommendations to AL Solutions that it should change its process design or dust management systems. The insurance audits also did not reference industry consensus standards for dust, such as National Fire Protection Association (NFPA) 484, Standards for Combustible Metals,21 the standard for processing and handling titanium and zirconium metal (addressed in Section 5.1). A comprehensive process hazard analysis was not recommended or performed despite the hazardous nature of the process and despite previous incidents. 4.2.2 Hydrogen Explosion CSB investigators determined that an ignition of zirconium dust likely caused the fatal explosion; however, the presence of flammable hydrogen acting in addition to the metal dust cannot be ruled out. Both titanium and zirconium dusts are water reactive, burn vigorously compared to other metals, and can produce hydrogen gas in the presence of heat (see below equations).22 metal+water→metal oxide+hydrogen Ti(s) + H2O(l) TiO2(s) + H2(g) Zr(s) + H2O(l) ZrO2(s) + H2(g) The metal oxide layer formed on the dust particle prevents the reaction but in the case of AL Solutions, the oxide surface layer of the zirconium particles was removed during the milling process. The milling exposed a fresh layer of zirconium and increased the potential for hydrogen formation. The combustible dust expert commissioned by the CSB sampled the vapor space above the titanium and zirconium in the sample containers to measure the hydrogen concentration. Testing revealed small quantities (about 0.08 percent volume) of hydrogen in both the titanium and zirconium samples.23 The presence of hydrogen in the interstitial spaces between particles in the blender may have had a small contribution to the explosion energy in addition to the combustible zirconium particulate. AL Solutions did not have a ventilation system to control hydrogen concentrations. Natural ventilation was inconsistent in the production building; employees reported closing rollup doors for temperature control during the cold months. 21 NFPA 484: Standard for Combustible Metals; NFPA: Quincy, MA, 2012. 22 Davletshina, T.A. Cheremisinoff, N.P. (1998). Fire and Explosion Hazards Handbook of Industrial Chemicals. William Andrew Publishing/Noyes. Online version available at: http://app.knovel.com/hotlink/toc/id:kpFEHHIC03/fire-explosion-hazards 23 Both jars had hydrogen concentrations of about 2% of the 4 volume % hydrogen lower flammability limit, i.e. about 0.08 vol%. The oxygen readings indicated some oxidation of the dust samples between collection and testing. The titanium sample likely also underwent some reaction due to the high moisture level in the sample. Moisture reaction does produce some hydrogen in the vapor space.

CSB • AL Solutions Case Study 15 AL Solutions Case Study Final Investigation Report July 2014 4.3 PREVIOUS FIRES AND EXPLOSIONS Before the 2010 incident, the New Cumberland facility had experienced two fatal explosions involving the ignition of metal dust. From 1993 until the December 2010 incident, the New Cumberland VFD responded to at least seven fires at AL Solutions. The AL Solutions milling facility in Missouri also had a fire that required a response from the local fire department. The CSB learned that several other fires occurred at the New Cumberland facility that did not result in a fire department response. In fact, almost all employees (with the exception of the newest ones) reported to CSB investigators that they had witnessed one or more fires in the production building. Despite the frequent incidence of fires during operation, AL Solutions continued to use a housekeeping approach as its principle means to minimize dust accumulations rather than adopting more robust engineering controls. The NFPA 484 Standard recommends that affirmative steps of dust control, such as dust collection equipment, should be implemented above housekeeping. The following three sections discuss in further depth the two previous incidents at AL Solutions that resulted in worker fatalities and a previous fire caused by a blender malfunction. 4.3.1 1995 Propane and Titanium Explosion In August 1995, one employee was killed and another was injured in an explosion and fire at the New Cumberland facility. A leaking propane tank and undetermined ignition source caused the fire. According to a West Virginia Fire Marshal report on the incident, the propane pooled under the tank outside the production building wall, and propane vapor began to accumulate inside the building walls. The propane ignited because of an unknown source, generating a blast wave that lofted titanium dust. This dust ignited and caused a secondary explosion24 that ignited combustible material within the production building. OSHA investigated the incident and issued a series of citations to Jamegy. The incident prompted Jamegy to make numerous changes, including isolating the propane rack from buildings and constructing a new production building designed to address the hazards of processing explosible titanium dust. After the 1995 incident, Jamegy constructed a new production building made of prefabricated concrete that was separated from the warehouse, laboratory, and office. This production building is the site of the 2010 incident. Its design included drains to better facilitate washing powder from equipment and surfaces. A water deluge system was installed for fire suppression. All electrical equipment in the blending and press room was designed to be sealed to prevent a pathway for dust to any electrical sparks or ignition sources. Jamegy did not take the opportunity to install dust collection systems in accordance with the existing NFPA combustible dust codes at that time and instead continued to rely on housekeeping to minimize dust accumulations. The installation of a deluge system to control a metal dust fire was contrary to recognized industry practices and to the titanium and zirconium MSDSs for extinguishing metal dust fires. 4.3.2 1996 Incident Soon after production operations resumed in the new building, a flash fire occurred in the blender, damaging the blender and the press located under it. An eyewitness stated that the flame appeared to emerge from the sidewall of the blender. A post-fire examination indicated that one of the paddles had broken off, possibly causing friction between the blender and the paddle, which likely initiated the fire. This fire produced no injuries, but 24 Secondary dust explosions occur when an initial event dislodges more accumulated dust into the air. If ignited, the dispersed dust may cause one or more secondary explosions. These can be more destructive than the initial event due to a greater quantity and concentration of dust.

CSB • AL Solutions Case Study 16 AL Solutions Case Study Final Investigation Report July 2014 Jamegy had to construct and install a new blender. The new blender was constructed of stainless steel rather than the carbon steel used in the previous blender, and it was operated at a lower shaft speed to reduce the likelihood of frictional heating leading to ignition. 4.3.3 2006 Incident In July 2006, a supervisor was fatally injured while cleaning out the inside of the mill tank when residual metal in the mill ignited. The death caused Jamegy to change its mill cleaning procedure. Before the incident, the procedure required an operator to get into the mill and shovel the metal into tubs. As a result of the incident, a valve was placed on the bottom of the mill, enabling operators to hose down the interior of the mill and drain it. OSHA conducted an investigation as a result of this incident and levied fines on Jamegy for five serious safety violations: lack of proper confined space permits, lack of protective equipment (such as flame retardant clothing in the presence of zirconium), lack of sufficient guard rails on a platform, lack of machine guarding, and lack of adequate lockout/tagout procedures. The citations did not mention industry standards such as NFPA 484 to address a failure to control metal dust hazards. 5.0 INDUSTRY CODES AND STANDARDS 5.1 NFPA 484 NFPA 484, Standard for Combustible Metals, is one of several NFPA standards on combustible dust. It applies to facilities, such as the AL Solutions facility, that produce, process, finish, handle, recycle, or store metals and alloys in a form capable of combustion or explosion. Like many other NFPA consensus standards, NFPA 484 serves as a guidance document that is voluntary unless adopted by local or state authorities. NFPA 484 describes the tests and methods for determining metal dust combustibility and provides guidelines for preventing metal dust explosions and flash fires. The CSB commissioned the dust explosivity testing listed in NFPA 484 to determine the applicability of the standard. The testing, described in Section 4.3.1 of NFPA 484-2009, shows that the AL Solutions metal dust samples are explosible and therefore that NFPA 484 was applicable to processes at the New Cumberland facility. Chapter 10 of NFPA 484-2009,25 the version of the standard available at the time of the incident, covers facilities processing titanium, and Chapter 11 addresses facilities processing zirconium. Both chapters include similar provisions for the handling and storage of titanium and zirconium, respectively. The requirements specific to fire prevention and emergency response are retroactive for existing facilities. The practices at AL Solutions did not align with many of the provisions of these chapters. If AL Solutions had voluntarily followed NFPA 484—or if its provisions had been enforced by the West Virginia State Fire Marshal, the authority having jurisdiction (AHJ),26 or by OSHA—the incident might have been prevented, or its consequences might have been reduced. NFPA 484 requires the use of flame-resistant clothing to reduce the severity of injuries from flash fires. AL Solutions provided its operators with 100 percent cotton work shirts and pants that were not flame resistant. NFPA 484-2009 stated that personnel handling dry 25 Chapter 10, Titanium, in NFPA 484-2009 is Chapter 12 in the 2012 edition of NFPA 484. Zirconium is Chapter 13 in NFPA 484-2012. (1) NFPA 484: Standard for Combustible Metals; NFPA: Quincy, MA, 2009. (2) NFPA 484: Standard for Combustible Metals; NFPA: Quincy, MA, 2012. 26 The authority with jurisdiction is the organization, office, or individual responsible for approving equipment, materials, an installation, or a procedure.

CSB • AL Solutions Case Study 17 AL Solutions Case Study Final Investigation Report July 2014 titanium powder must wear non-sparking shoes and noncombustible or flame-retardant clothing without pockets, cuffs, laps, or pleats in which powder can accumulate.27 A similar requirement was listed for zirconium. The titanium and zirconium chapters also required the installation and use of dust collection systems to control metal dust accumulations near process equipment and dust-producing operations. The AL Solutions production building was not equipped with a dust collection system. Chapter 13 of NFPA 484-200928—Fire Prevention, Fire Protection, and Emergency Response—included general provisions for preventing metal dust fires and applied to existing facilities.29 Section 13.2.5, Control of Friction Hazards, stated, “All machinery shall be installed and maintained in such a manner that the possibility of friction sparks is minimized.” Employees at AL Solutions reported recurring issues with the blender blade contacting and scratching the sidewall; however, maintenance did not adequately address the metal-to-metal contact that was the likely ignition source for the 2010 explosion. NFPA 484 declared that “[a]utomatic sprinkler protection shall not be permitted in areas where combustible metals are produced or handled”30 because water sprayed on a titanium or zirconium fire can lead to burning metal dust or an explosion.31 Despite warnings in NFPA 484 and despite MSDS discussions of the hazards of using water to fight metal fires, AL Solutions chose a water deluge system as its method to extinguish a metal dust fire. In previous incidents, the VFD also had extinguished fires with water hoses, exposing the firefighters to potential explosion hazards. Section 13.5.2 of NFPA 484-2009 recommended creating a comprehensive emergency preparedness plan—and making it available to emergency responders—because of the unique characteristics of metal dust fires. Several sections of NFPA 484 include provisions for the proper storage of combustible metals. For example, according to Chapter 13, “Open storage of metal chips and fines are to be isolated and separated from other metal scrap to prevent fire propagation.” Chapter 14, Combustible Metal Recycling Facilities,32 requires that dry storage of more than six drums of dry combustible metals must be separated from other parts of the recycling facility. The AL Solutions safety manual included similar requirements for the separation of titanium and zirconium; however, at the time of the incident, AL Solutions was storing both metals in close proximity in the production building, which fueled the fire and explosion. AL Solutions acknowledged the hazards of titanium and zirconium powder in its product MSDSs and company safety plan. Several previous incidents also had demonstrated the hazards of these materials. However, management did not enforce company policies to reduce the risk of metal dust explosions and fires, and its dust management practices did not align with industry consensus standards, such as NFPA 484. The CSB determined that the operators, supervisors, and engineers at AL Solutions were not familiar with NFPA 484 and that the process design, construction, and fire prevention practices did not consider the provisions of the NFPA standard. 27 NFPA. Section 10.6.3, Personnel Safety Precautions. NFPA 484: Standard for Combustible Metals; NFPA: Quincy, MA, 2009. 28 This is Chapter 15 in the NFPA 484-2012 edition. NFPA 484: Standard for Combustible Metals; NFPA: Quincy, MA, 2012. 29 According to the NFPA general retroactivity clause, the other chapters in NFPA 484 are not applicable to existing facilities unless the AHJ deems that “the existing situation presents an unacceptable degree of risk.” 30 NFPA, Section 13.3.1. NFPA 484: Standard for Combustible Metals; NFPA: Quincy, MA, 2009. 31 Many metals (including titanium and zirconium) burn at such a high temperature and are sufficiently water reactive to produce a violent reaction when water is applied to burning metal. Such a reaction occurred while firefighters were using hose streams on a 2010 fire at a Los Angeles titanium scrap warehouse, injuring at least one firefighter. 32 This chapter is Chapter 16 in the NFPA 484-2012 edition. NFPA 484: Standard for Combustible Metals; NFPA: Quincy, MA, 2012.

CSB • AL Solutions Case Study 18 AL Solutions Case Study Final Investigation Report July 2014 5.1.1 Water-Based Cleaning Methods in Combustible Metal Operations Though engineering controls such as dust collection systems should be used to prevent accumulations, housekeeping operations may be a secondary means of control. In the absence of a dust collection system, the AL Solutions facility relied primarily on water sprays and wash-downs to control and reduce accumulations of fugitive titanium and zirconium powders. As noted previously, water sprays are not recommended for zirconium and titanium fires and are particularly hazardous when in contact with molten or burning titanium because of a reaction that liberates explosive hydrogen gas. The CSB reviewed the applicable national consensus standard, NFPA 484-2012, and found that Chapter 15, Fire Prevention, Fire Protection and Emergency Response, specifies the following important safety requirements for water cleaning operations: 15.2.2.4.4 Water Cleaning Requirements - The use of water for cleaning shall not be permitted in manufacturing areas unless the following requirements are met:

  1. Competent technical personnel have determined that the use of water will

be the safest method of cleaning in the shortest exposure time.

  1. Operating management has full knowledge of, and has granted approval of

its use.

  1. Ventilation, either natural or forced, is available to maintain the hydrogen

concentration safely below the LFL (lower flammability limit).

  1. Complete drainage of all water and powder to a remote area is available.33

NFPA informed the CSB that these requirements are intended to apply to water cleaning activities in all combustible metal operations, including those involving titanium and zirconium. The CSB, however, noted that the applicability of these requirements to titanium and zirconium operations is not made clear in the current version of NFPA 484, which could result in employers’ failing to follow these requirements for operations involving water-reactive combustible dusts. In discussions with CSB investigators, NFPA staff indicated that this issue will be clarified in the 2015 edition of NFPA 484. The water-based cleaning requirements will be moved to a new housekeeping chapter earlier in the code (Chapter 7). This chapter will include general housekeeping requirements for all metals, including water-cleaning operations. 6.0 REGULATORY ANALYSIS 6.1 OCCUPATIONAL SAFETY AND HEALTH ADMINISTRATION (OSHA) 6.2 OSHA COMBUSTIBLE DUST STANDARD FOR GENERAL INDUSTRY Since 2006, the CSB has recommended that OSHA generate a general industry standard for combustible dust based on NFPA standards 65434 and 484. Despite repeated CSB recommendations and fatal dust incidents since the issuance of the recommendation, OSHA has not issued a final combustible dust standard. OSHA has recognized the need and importance of a combustible dust standard and in the past have made steps towards promulgating a standard, but it has been delayed. After the CSB recommendation in 2006, OSHA launched a Combustible Dust National Emphasis Program (NEP), but this program is 33 NFPA. Section 15.2.2.4.4.2 NFPA 484: Standard for Combustible Metals; NFPA: Quincy, MA, 2012. 34 NFPA 654: Standard for the Prevention of Fire and Dust Explosions from the Manufacturing, Processing, and Handling of Combustible Particulate Solids. NFPA: Quincy, MA, 2012.

CSB • AL Solutions Case Study 19 AL Solutions Case Study Final Investigation Report July 2014 limited in scope and application and did not have the wide reaching impact that would be achieved by a combustible dust standard.35 In 2008, the CSB issued a report on the Imperial Sugar explosion that recommended OSHA “proceed expeditiously” in creating a combustible dust standard. After this recommendation OSHA announced that they would start rulemaking for a standard. In 2009 and 2010, OSHA made progress on developing a standard by holding stakeholder meetings around the country. After these stakeholder meetings OSHA postponed the next step in the rulemaking process multiple times. The table in Appendix B gives a full account of CSB investigations and recommendations as well as OSHA actions taken toward developing a combustible dust standard. In this Case Study the CSB is reiterating a recommendation made in 2006 for OSHA to “Issue a standard designed to prevent combustible dust fires and explosions in general industry…” which eight years after the initial recommendation, OSHA still has not fulfilled. However, OSHA has been involved in several activities since 2005 to increase awareness of combustible dust, for both compliance officers and industry. In addition to working toward enacting a final combustible dust rule, OSHA has developed non-regulatory guidance for combustible dust, including a safety and health information bulletin36, a combustible dust hazard communication guide37, and precautions and training information for firefighter fighters38. Additionally, OSHA sent out 30,000 letters to employers that handle combustible dust to raise hazard awareness after the 2008 Imperial Sugar incident. 6.2.1 Combustible Dust National Emphasis Program In 2006 the CSB recommended OSHA develop and issue a special emphasis program to address combustible dust hazards while the combustible dust standard was under development. In 2007, OSHA issued the Federal OSHA Combustible Dust National Emphasis Program (NEP)39 in response to this recommendation to focus on industries that generate, store, or handle combustible dusts. The NEP provides guidance to OSHA inspectors on how to inspect and issue citations for workplace conditions involving combustible dust hazards through the Occupational Safety and Health Act General Duty Clause,40 the OSHA Housekeeping Standard,41 and other applicable general industry standards. The NEP can be applied to any facility with combustible dust, but the program specifically lists target industries by the North American Industry Classification System (NAICS) code.42 Although the NEP addressed combustible dust as temporary measure in the absence of a general industry standard, the program has limitations which OSHA has recognized.43 The NEP itself 35 NEP inspections are based on a randomized selection of facilities, regardless of accident history. They can be useful for industry when conducted as a result of a targeted inspection, complaint, or referral. 36 Occupational Safety and Health Administration (OSHA). Combustible Dust in Industry: Preventing and Mitigating the Effects of Fire and Explosions; Safety and Health Information Bulletin SHIB 07-31-2005; July 2005. 37 Occupational Safety and Health Administration (OSHA). Hazard Communication Guidance for Combustible Dusts. https://www.osha.gov/ Publications/3371combustible-dust.html 38 Occupational Safety and Health Administration (OSHA). Firefighting Precautions at Facilities with Combustible Dust. https://www.osha.gov/ Publications/OSHA_3644.pdf 39 Occupational Safety and Health Administration (OSHA). Combustible Dust National Emphasis Program; Reissued; OSHA Instruction CPL 03-00- 008; March 11, 2008. 40 Under the Occupational Safety and Health Act of 1970, Section 5(a)(1), known as the General Duty Clause, states, “Each employer shall furnish to each of his employees employment and a place of employment which are free from recognized hazards that are causing or are likely to cause death or serious physical harm to his employees.” 41 29 CFR 1910.22 42 The AL Solutions NAICS code for the New Cumberland facility was 331492, Secondary Smelting and Metal Refining of Non-Ferrous Metal (except Copper and Aluminum). This NAICS code was not listed in the Combustible Dust NEP; however, the broader Standard Industrial Classification (SIC) code 3341, Secondary Nonferrous Metals, was listed among the industries with a “more frequent and/or high consequence combustible dust explosions/fires.” 43 https://www.osha.gov/dep/combustible_dust/combustible_dust_nep_rpt_102009.html

CSB • AL Solutions Case Study 20 AL Solutions Case Study Final Investigation Report July 2014 does not require action from covered facilities;44 it provides guidance to OSHA Area Offices (and adopted state plan offices) on how to determine whether an employer, upon inspection, is in violation of currently existing regulations, such as the OSHA Housekeeping Standard. The NEP references NFPA 484, 654 and other NFPA industry consensus standards for dust, and the provisions of these codes are not enforceable requirements but may be consulted by OSHA compliance officers to obtain evidence of hazard recognition or provide means for abatement activities issued as a result of the NEP inspection. 6.2.2 OSHA West Virginia Area Office The West Virginia Area Office of OSHA conducted an inspection of the AL Solutions facility and issued one willful and 12 serious violations to the company as a result of the 2010 incident. OSHA cited AL Solutions for several serious violations of the General Duty Clause, including an inadequate hydrogen detection system, a lack of explosion venting in the production area, and the improper storage of combustible metals. (OSHA typically issues General Duty Clause citations when it lacks a specific enforceable standard for the hazard or industrial sector involved.) Other serious violations included the lack of training, poor communication about hazards, and failure to provide employees with fire-resistant clothing to reduce the severity of injuries from a flash fire. The willful violation issued to AL Solutions cited the use of water rather than the recommended sand or salt extinguishing agents to suppress a metal dust fire. Since the issuance of the Combustible Dust NEP, the CSB found no documentation of any OSHA NEP-based inspection at AL Solutions before the 2010 explosion. 6.3 ENVIRONMENTAL PROTECTION AGENCY In December 2013, AL Solutions agreed to implement safeguards at all facilities in a settlement of U.S. Environmental Protection Agency (EPA) Clean Air Act violations. EPA cited AL Solutions for a violation of Section 112(r)(1) of the Clean Air Act, which imposes a general duty on owners and operators of facilities with extremely hazardous chemicals to identify hazards associated with an accidental release, design and maintain a safe facility, and minimize the consequences of any accidental releases. As part of the settlement, EPA requires that AL Solutions implement several company-wide safeguards, including the following: • Completion of process hazard analyses, including combustible dust testing and analysis • Limitations on the acceptance of new metal feedstock and a disposal plan for titanium and zirconium metals at the New Cumberland facility • Implementation of safety procedures for hydrogen gas detection • Application of specific chapters and sections of NFPA 484-2012. As of the publication date of this case study, AL Solutions is working in consultation with EPA to complete several requirements of the consent order. The company also will pay a penalty for Clean Air Act violations based on inspections at the New Cumberland, West Virginia, and Washington, Missouri, facilities following the incident. 44 http://www.oshrc.gov/decisions/html_2014/11-2969.htm

CSB • AL Solutions Case Study 21 AL Solutions Case Study Final Investigation Report July 2014 6.4 WEST VIRGINIA FIRE CODE The West Virginia Fire Code is intended to support “the safeguarding of life and property from the hazards of fire and explosion.” It incorporates the standards and requirements in the 2009 edition of the NFPA National Fire Codes. The West Virginia State Fire Code declares that the National Fire Codes “have the same force and effect as if set out verbatim in this rule.” It also states, “The State Fire Marshal shall make use of the standards and requirements within the incorporated publications in all matters coming under his or her jurisdiction.” The 2009 edition of NFPA 484, Standard for Combustible Metals, is one of the standards referenced in the National Fire Codes, and it is incorporated in the West Virginia Fire Code and is enforceable by the AHJ. The State Fire Marshal holds the authority to dictate which repairs or changes are necessary to mitigate any fire hazard in a facility. The State Fire Marshal can exercise this authority when “any building or structure has been constructed, altered, or repaired in a manner violating the State Fire Code” and when “any building or structure is being maintained or used in such a way as to endanger life or property from the hazards of fire or explosion.” NFPA 484-2009 states, “A documented risk evaluation acceptable to the AHJ shall be conducted to determine the level of explosion protection to be provided for a dust collection system.” The State Fire Marshal is the AHJ for West Virginia. However, the State Fire Marshal’s Office does not regularly inspect buildings to ensure compliance with the State Fire Code. In West Virginia, the State Fire Marshal’s Office has a variety of roles. It certifies fire departments, investigates fires and explosions, enforces the fire code, and conducts fire inspections. Neither the State Fire Marshal nor the New Cumberland VFD inspected the AL Solutions facility to ensure compliance with the State Fire Code or with NFPA 484. After the 2006 incident, the State Fire Marshal performed an investigation but issued no recommendations and did not require the facility to follow NFPA 484. Approximately 17 inspectors in the West Virginia State Fire Marshal’s Office are tasked with inspecting facilities throughout the state and ensuring compliance with the State Fire Code. A company can request an inspection by filling out a form online and paying $50. The CSB has previously discussed the issues associated with fire code enforcement by state or local fire marshals. For example, the CSB Combustible Dust Hazard Study states the following: The CSB found little enforcement of fire codes in industrial facilities. Most jurisdictions focus on life-safety issues; as such, most enforcement resources of local code authorities are dedicated to means of egress, fire extinguishers, etc. in schools, hotels, nursing homes, hospitals, night clubs, and other such facilities, as opposed to industrial fire and explosion hazards including combustible dust hazards or hazardous materials’ use and storage. Another problem is that inspections are often conducted by local fire departments, whose members likely have limited knowledge of industrial processes and hazards.45 This conclusion further demonstrates the need for an OSHA combustible dust standard. The NFPA 484 requirements incorporated into state fire codes might be enforceable, but they will not be effective if local fire departments do not have the knowledge and resources necessary to inspect facilities and enforce those requirements. The issuance of a combustible dust regulation would provide companies with specific and enforceable requirements for the prevention of combustible dust fires and explosions. 45 Combustible Dust Hazard Study; U.S. Chemical Safety and Hazard Investigation Board: Washington, DC, 2006.

CSB • AL Solutions Case Study 22 AL Solutions Case Study Final Investigation Report July 2014 7.0 RECOMMENDATIONS The CSB has addressed the issue of combustible dusts in several previous investigations (Appendix B). In 2006, the CSB issued the Combustible Dust Hazard Study. The CSB initiated this study after investigating three combustible dust incidents in 2003 that resulted in 14 deaths. One of the three incidents involved combustible metal dust at the Hayes Lammerz Plant in Indiana in 2003. A powdered aluminum explosion and fire killed one worker and injured six other workers. The 2006 CSB study identified 281 combustible dust incidents between 1980 and 2005, which resulted in the deaths of 119 people and injured 718 other people. In this study, 20 percent of the combustible dust incidents involved metal dusts. Many of the issues in the Combustible Dust Hazard Study apply to the AL Solutions incident. For example, the study includes a discussion of the lack of sufficient oversight and notes the following: Consensus standards developed by the National Fire Protection Association (NFPA) that provide detailed guidance for preventing and mitigating dust fires and explosions are widely considered to be effective; however, …. among jurisdictions that have adopted the fire codes, enforcement in industrial facilities is inconsistent, and, in the states the CSB surveyed, fire code officials rarely inspect industrial facilities. The Combustible Dust Hazard Study also considers state oversight priorities: The states have mainly focused fire code enforcement on fire hazards in occupied structures such as schools, hospitals, and office buildings, but not in industrial facilities, and not on dust explosion control requirements, which are only a small portion of the broader code requirements. In the Combustible Dust Hazard Study, the CSB made a recommendation to OSHA that it should issue a general industry standard for the prevention of combustible dust fires and explosions, based on the current NFPA dust standards (including NFPA 65446 and NFPA 484). In February 2008, a combustible dust explosion at the Imperial Sugar Refinery in Georgia killed 14 employees and contractors and injured 36 others. The CSB found that the explosion was caused by an ignition of granulated sugar dust in a recently enclosed conveyor belt system under the sugar silos.47 At the time the CSB report on Imperial Sugar was published, OSHA still had not issued a proposed rule for combustible dust. After the Imperial Sugar Refinery incident, in March 2008, OSHA revised the Combustible Dust NEP to increase enforcement, expanding required NEP inspections to four per area office per fiscal year, instead of one. In 2009, OSHA announced its intention to initiate rulemaking on a combustible dust standard. In its investigation report on the Imperial Sugar Refinery explosion, the CSB made several recommendations to OSHA, including the following: Proceed expeditiously, consistent with the Chemical Safety Board’s November 2006 recommendation and OSHA’s announced intention to conduct rulemaking, to promulgate a comprehensive standard to reduce or eliminate hazards from fire and explosion from combustible powders and dust.48 The CSB also produced a case study report on three iron dust fires and a hydrogen explosion involving that occurred in 2011 at the Hoeganaes Corporation iron powder facility in Gallatin, 46 NFPA 654: Standard for the Prevention of Fire and Dust Explosions from the Manufacturing, Processing, and Handling of Combustible Particulate Solids; NFPA: Quincy, MA, 2013. 47 Imperial Sugar Investigation Report; U.S. Chemical Safety and Hazard Investigation Board: Washington, DC, 2009. 48 Imperial Sugar Investigation Report; U.S. Chemical Safety and Hazard Investigation Board: Washington, DC, 2009.

CSB • AL Solutions Case Study 23 AL Solutions Case Study Final Investigation Report July 2014 Tennessee; these incidents resulted in five worker deaths.49 At the time of the CSB report, OSHA had twice postponed the next step in the combustible dust rulemaking process, the Small Business Regulatory Enforcement Fairness Act50 (SBREFA) panel process. The CSB recommended that OSHA ensure that the forthcoming dust standard includes requirements for combustible metals and also recommended the publication of a proposed dust standard within a year after the issuance of the Hoeganaes case study. The CSB collected and validated data from combustible dust fires and explosions nationwide that resulted in worker injuries or fatalities from 2008 to 2012 (Shown in Appendix C).51 During that 5-year period, 50 fires or explosions involving combustible dusts resulted in 29 fatalities and 161 injuries. In October 2012, the CSB investigated an explosion and flash fire at the U.S. Ink manufacturing facility in East Rutherford, New Jersey. This incident resulted in seven employee injuries and was likely caused by an ignition of combustible powders used in the production of ink. In July 2013, the CSB board voted and declared that OSHA’s response to previous combustible dust recommendations was “unacceptable” because OSHA had yet to develop even a proposed rule on combustible dust hazards, more than 4 years after it committed to start rulemaking. The need for an OSHA combustible dust standard became the first item in the CSB Most Wanted Chemical Safety Improvement Program, adopted by the Board at the July 2013 meeting. If OSHA had implemented the first CSB recommendation for a combustible dust standard in 2006, many of the severe combustible dust incidents that followed, including the AL Solutions incident, might have been prevented. 8.0 KEY FINDINGS As a result of the AL Solutions investigation, the CSB makes the following findings:

  1. The explosion in the production building was caused by combustible titanium and zirconium

dusts that were processed at the facility.

  1. The explosion likely originated in a blender containing milled zirconium particulates and

ignited by frictional heating or spark ignition of the zirconium arising from defective blender equipment.

  1. The hydrogen gas produced by the reaction of molten titanium or zirconium metal and water,

possibly from wash-down operations or the water deluge system, may have also contributed to the explosion.

  1. Testing conducted after the incident determined that zirconium and titanium samples collected

from the AL Solutions facility were combustible and were capable of causing an explosion when lofted near heat or an ignition source.

  1. AL Solutions did not mitigate the hazards of metal dust explosions through engineering

controls, such as a dust collection system. Specifically, AL Solutions did not adhere to the practices recommended in NFPA 484 for controlling combustible metal dust hazards. 49 Hoeganaes Corporation Investigation Case Study; U.S. Chemical Safety and Hazard Investigation Board: Washington, DC, 2011. 50 When an OSHA proposal is expected to have a significant impact on a substantial number of small entities, the agency must notify the U.S. Small Business Administration (SBA) Office of Advocacy. OSHA convenes an SBREFA panel to hear comments from small entity representatives and to review the draft proposed rule and related analyses prepared by OSHA. 51 Data collected in support of H.R. 691: Worker Protection against Combustible Dust Explosions and Fires Act of 2013 introduced on February 14, 2013 and referred to the Committee on Education and the Workforce. H.R. 691 is a bill to require the Secretary of Labor to issue an interim occupational safety and health standard regarding worker exposure to combustible dust, and for other purposes.

CSB • AL Solutions Case Study 24 AL Solutions Case Study Final Investigation Report July 2014

  1. The West Virginia Area Office of OSHA did not conduct a Combustible Dust NEP inspection

at AL Solutions before the 2010 incident, despite the company’s history of metal dust incidents. The Combustible Dust NEP inspections are based on a randomized selection of facilities regardless of previous incidents, unless initiated by a complaint or referral.

  1. Combustible dust incidents continue to occur throughout susceptible industries, but the next

steps of the OSHA rulemaking process for promulgating a general industry combustible dust standard have been delayed. 9.0 REITERATED RECOMMENDATIONS OCCUPATIONAL SAFETY AND HEALTH ADMINISTRATION The absence of a general industry safety standard for combustible dust remains an important safety issue as catastrophic dust incidents continue to occur throughout industry. Therefore, the CSB reiterates the following recommendation, originally issued to OSHA in the 2006 Combustible Dust Hazard Investigation: 2006-1-H-1 Issue a standard designed to prevent combustible dust fires and explosions in general industry. Base the standard on current National Fire Protection Association (NFPA) dust explosion standards (including NFPA 654 and NFPA 484), and include at least - hazard assessment, - engineering controls, - housekeeping, - building design, - explosion protection, - operating procedures, and - worker training. 10.0 RECOMMENDATIONS As a result of its investigation of this accident, the CSB makes the following safety recommendations: TO AL SOLUTIONS, INC.: 2011-3-I-WV R1 For all new and existing equipment and operations at AL Solutions facilities that process combustible metal dusts or powders, apply the following chapters of NFPA 484-2012, Standard for Combustible Metals: • Chapter 12, Titanium • Chapter 13, Zirconium • Chapter 15, Fire Prevention, Fire Protection, and Emergency Response • Chapter 16, Combustible Metal Recycling Facilities 2011-3-I-WV R2 Develop training materials that address combustible dust hazards and plant- specific metal dust hazards and then train all employees and contractors. Require periodic (e.g., annual) refresher training for all employees and contractors. TO AL SOLUTIONS, INC., FACILITY IN BURGETTSTOWN, PENNSYLVANIA: 2011-3-I-WV R3 Prohibit the use of sprinkler systems and water deluge systems in all buildings that process or store combustible metals. 2011-3-I-WV R4 Conduct a process hazard analysis as defined in NFPA 484-2012, Section 12.2.5, and submit a copy to the local fire department or the enforcing authority for the fire code.

CSB • AL Solutions Case Study 25 AL Solutions Case Study Final Investigation Report July 2014 APPENDIX A SUMMARY OF DUST EXPLOSIBILITY TEST RESULTS Material Name Titanium Inside Press #1 Zirconium Crush Pellet Titanium Mixture Pmax, bar-g52 2.8 4.3 6.3 Rmax, bar/s53 n/a 45 277 Kst bar-m/s54 n/a 12 75 Explosion Severity n/a 0.08 0.76 Classification* Combustible55 Combustible, but not Class II Class II Combustible *Classification of Combustible Dusts: A Class II combustible dust is defined by NFPA 499 Recommended Practice for the Classification of Combustible Dusts and Hazardous (Classified) Locations for Electrical Installations in Chemical Process Areas. A dust is classified as Class II based on its Explosion Severity:

Explosion Severity =

(Pmax × Rmax ) sample

(Pmax × Rmax) reference dust56 Explosion Severity (ES) Value Dust Classification ES < 0.4 Combustible, but not Class II 0.4 < ES < 0.5 Indeterminate. Combustible, but not Class II based on ES criterion alone ES > 0.5 Class II Combustible Pmax < 1 bar Not Combustible 52 Pmax is the maximum explosion pressure in the test vessel. 53 Rmax is the maximum rate or pressure rise in the test vessel. 54 Kst is an index computed from Rmax and the volume of the test vessel. It is used to classify the explosion severity of a material 55 The titanium #1 combustibility determination was based on the Go/No-Go Test for Determination of Dust Cloud Combustibility as described in ASTM Standard Test Method E1226 “Pressure and Rate of Pressure Rise for Combustible Dusts” with a focus on establishing whether the sample is capable of propagating a dust cloud deflagration. 56 Pittsburgh Coal Dust

CSB • AL Solutions Case Study 26 AL Solutions Case Study Final Investigation Report July 2014 APPENDIX B CHRONOLOGY OF EVENTS INVOLVING COMBUSTIBLE DUST, 2006 TO PRESENT November 9, 2006 The U.S. Chemical Safety and Hazard Investigation Board (CSB) votes to approve the Combustible Dust Hazard Study, which calls on the Occupational Safety and Health Administration (OSHA) to issue a general industry standard for combustible dust, based on National Fire Protection Association (NFPA) standards 654 and 484. February 9, 2007 OSHA writes interim response to the CSB, reporting the forthcoming issuance of a dust Special Emphasis Program. October 18, 2007 OSHA launches Combustible Dust National Emphasis Program (NEP). February 7, 2008 The CSB investigates a sugar dust fire and explosion at the Imperial Sugar Refinery in Port Wentworth, GA, that killed 14 people and injured 38. March 11, 2008 OSHA revises and reissues the Combustible Dust NEP to increase enforcement activities and sends a combustible dust safety bulletin to 30,000 workplaces in industries that handle combustible dust.57 March 27, 2008 In response to the 2006 CSB recommendation, OSHA submits a second interim response describing efforts to address combustible dust in the NEP. OSHA “continues to consider” the 2006 recommendation for a dust standard. April 29, 2009 U.S. Department of Labor (DOL) announces that OSHA is initiating a comprehensive rulemaking on combustible dust.58 September 24, 2009 The CSB issues its final report on the 2008 Imperial Sugar Refinery explosion and issues recommendation to OSHA to “proceed expeditiously” in promulgating a dust standard consistent with the 2006 recommendation. October 21, 2009 OSHA publishes an Advance Notice of Proposed Rulemaking (ANPRM) in the Federal Register and requests information from affected stakeholders.59 December 14, 2009 OSHA holds stakeholder meetings in Washington, DC, on the combustible dust rule. January 8, 2010 Because OSHA commenced rulemaking on a combustible dust general industry standard, the CSB votes to designate the recommendation from the 2006 dust study as “Open–Acceptable Response.” February 17, 2010 OSHA holds a second set of stakeholder meetings on the dust rule, this time in Atlanta, GA. April 21, 2010 OSHA holds a third set of stakeholder meetings on the dust rule, this time in Chicago, IL. April 26, 2010 OSHA designates the issuance of a dust standard as a “long-term action” in the Spring Semiannual Regulatory Agenda. OSHA estimates the next step in the rulemaking process, the SBREFA panel, will take place in April 2011.60 June 28, 2010 OSHA holds a web chat virtual stakeholder meeting to gather information in developing a combustible dust rule. December 9, 2010 A dust-related explosion at AL Solutions in New Cumberland, WV, kills three workers and injures one. 57 Occupational Safety and Health Administration. OSHA Reissues its Combustible Dust National Emphasis Program: Agency Enhances its Enforcement Activities at Facilities Handling Combustible Dusts. Trade News Release, March 12, 2008. 58 Occupational Safety and Health Administration. U.S. Department of Labor’s OSHA Announces Rulemaking on Combustible Dust Hazards. National Press Release, April 29, 2009. http://www.osha.gov/pls/oshaweb/owadisp.show_document?p_table=NEWS_RELEASES&p_id=17828 (accessed on April, 21, 2014). 59 Occupational Safety and Health Administration. Combustible Dust: Advanced Notice of Proposed Rulemaking. Federal Register 2009, 74 (202), 54333–347. http://www.gpo.gov/fdsys/pkg/FR-2009-10-21/html/E9-25075.htm (accessed on April 21, 2014). 60 Occupational Safety and Health Administration. Federal Register, 75 (79), 46.

CSB • AL Solutions Case Study 27 AL Solutions Case Study Final Investigation Report July 2014 January 31, 2011 An iron dust flash fire fatally injuries two employees at the Hoeganaes facility in Gallatin, TN. March 29, 2011 A second iron dust flash fire injures one employee at the Hoeganaes facility in Gallatin, TN. April 30, 2011 OSHA does not convene an SBREFA panel. May 13, 2011 OSHA holds a Combustible Dust Expert Forum in Washington, DC, to examine all possible approaches to formulating a comprehensive combustible dust standard. May 27, 2011 A third metal dust–related incident occurs at Hoeganaes in Gallatin, TN. Three workers are killed, and two are injured. July 7, 2011 The DOL Spring Semiannual Regulatory Agenda estimates an SBREFA panel will take place in December 2011.61 December 16, 2011 The CSB votes to approve the Hoeganaes case study, which includes a recommendation to OSHA to issue the proposed rule within 1 year of the issuance of the case study. December 31, 2011 OSHA does not convene an SBREFA panel. January 5, 2012 The CSB publically releases the Hoeganaes case study in Gallatin, TN. January 20, 2012 The DOL Fall Semiannual Regulatory Agenda states that the dust standard is a “long-term action.” An estimated date for the next step in the rulemaking “process is undetermined.”62 June 14, 2012 OSHA responds to the Hoeganaes recommendations, stating that it cannot commit to a date for the proposed rule but that it remains a top OSHA priority. October 9, 2012 Seven workers are injured in a dust-related flash fire at the U.S. Ink facility in East Rutherford, NJ. December 16, 2012 This date marked the first anniversary of the issuance of the Hoeganaes case study and the 1-year deadline of the CSB recommendation for OSHA to issue a proposed rule. July 2013 The DOL Semiannual Regulatory Agenda estimates that the SBREFA panel will be held in November 2013.63 July 25, 2013 The CSB votes to designate all four previous recommendations issued to OSHA concerning the issuance of a dust standard with the status “Open–Unacceptable Response.” November 26, 2013 The DOL Fall 2013 Semiannual Regulatory Agenda estimates that the SBREFA panel will be held in April 2014.64 The SBREFA did not convene in November 2013. January 29, 2014 This date marked the eleventh anniversary of the polyethylene dust explosion at West Pharmaceuticals in Kinston, NC, which killed six workers and injured 38. January 31, 2014 This date marked the third anniversary of the first iron dust flash fire at the Hoeganaes facility in Gallatin, TN that killed two workers. 61 Office of Information and Regulatory Affairs Office of Management and Budget http://www.reginfo.gov/public/do/eAgendaViewRule?pubId=201104&RIN=1218-AC41 (accessed on April 21, 2014). 62 Office of Information and Regulatory Affairs Office of Management and Budget http://www.reginfo.gov/public/do/eAgendaViewRule?pubId=201110&RIN=1218-AC41 (accessed on April 21, 2014). 63 Office of Information and Regulatory Affairs Office of Management and Budget http://www.reginfo.gov/public/do/eAgendaViewRule?pubId=201304&RIN=1218-AC41 (accessed on April 21, 2014). 64 Office of Information and Regulatory Affairs Office of Management and Budget http://www.reginfo.gov/public/do/eAgendaViewRule?pubId=201310&RIN=1218-AC41 (accessed on April 21, 2014).

CSB • AL Solutions Case Study 28 AL Solutions Case Study Final Investigation Report July 2014 February 7, 2014 This date marked the sixth anniversary of the sugar dust explosion at the Imperial Sugar Refinery that killed 14 workers and injured 38. February 15, 2014 This date marked the eleventh anniversary of the phenolic resin dust explosion at CTA Acoustics in Corbin, KY, that killed seven workers and injured 37. March 29, 2014 This date marked the third anniversary of the second iron dust flash fire at the Hoeganaes facility in Gallatin, TN, which injured one worker. May 27, 2014 This date marked the third anniversary of the third metal dust–related incident at the Hoeganaes facility in Gallatin, TN, which killed three workers and injured two. October 9, 2014 This date will mark the second anniversary of the dust-related flash fire at the U.S. Ink facility in East Rutherford, NJ, which injured seven workers. October 29, 2014 This date will mark the eleventh anniversary of the aluminum dust explosions and fires at the Hayes Lemmerz facility in Huntingdon, IN, which killed one worker and injured two. November 6, 2014 This date will make the eighth anniversary of the release of the CSB Combustible Dust Hazard Study and the initial CSB recommendation that OSHA issue a combustible dust rule. December 9, 2014 This date will mark the fourth anniversary of the dust explosion and fire at the AL Solutions plant in New Cumberland, WV, that killed three workers and injured another.

CSB • AL Solutions Case Study 29 AL Solutions Case Study Final Investigation Report July 2014 APPENDIX C HIGH CONSEQUENCE INCIDENTS INVOLVING COMBUSTIBLE DUST FROM 2008 TO 2012 No. Incident Date City State Fatalities Injuries Explosion Fire 1 2/7/2008 Port Wentworth GA 14 38 Yes Yes 2 3/24/2008 Muskegon MS 0 14 No Yes 3 5/21/2008 Springdale AR 0 1 Yes Yes 4 6/19/2008 Monett MO 0 2 No Yes 5 7/21/2008 Hunt Valley MD 0 1 No Yes 6 8/10/2008 Jaffrey NH 0 2 No Yes 7 8/19/2008 Smithton IL 0 1 Yes No 8 9/2/2008 Stockton CA 0 6 Yes No 9 1/9/2009 Jasper IN 0 8 No Yes 10 2/3/2009 Oak Creek WI 0 4 Yes Yes 12 3/31/2009 Monrovia CA 0 1 No Yes 13 4/22/2009 Rockledge FL 0 1 No Yes 14 7/22/2009 Lima OH 0 1 Yes No 15 8/28/2009 Oakland CA 0 1 No Yes 16 9/29/2009 South Bend IN 0 1 Yes No 17 10/5/2009 Panama City FL 0 5 Yes Yes 18 10/7/2009 Nebraska City NE 0 2 Yes No 19 12/15/2009 Cedar Rapids IA 0 3 Yes No 20 12/29/2009 Elkhart Lake WI 1 9 Yes Yes 21 2/12/2010 Dillard OR 0 1 Yes No 22 9/24/2010 Burnside KY 1 3 Yes Yes 23 12/9/2010 New Cumberland WV 3 1 Yes Yes 24 12/10/2010 Dearborn MI 0 3 Yes Yes 25 12/21/2010 Pendergrass GA 0 2 Yes No 26 12/31/2010 Blacksburg VA 0 4 Yes No 27 1/31/2011 Gallatin TN 2 0 No Yes 28 3/4/2011 Salem VA 0 1 No Yes 29 3/15/2011 Wilmington NC 1 0 Yes No 30 3/29/2011 Gallatin TN 0 1 No No 31 4/26/2011 Santa Rosa CA 0 1 Yes Yes 32 5/9/2011 Louisville KY 0 2 Yes No 33 5/27/2011 Gallatin TN 3 2 No No

CSB • AL Solutions Case Study 30 AL Solutions Case Study Final Investigation Report July 2014 34 6/23/2011 Louisville KY 0 2 Yes Yes 35 7/27/2011 Harrisonburg VA 0 1 No Yes 36 8/12/2011 Biron WI 0 3 No Yes 37 8/16/2011 Gaston OR 0 3 Yes Yes 38 8/18/2011 Clinton IA 0 1 Yes Yes 39 9/9/2011 Niagara Falls NY 0 1 No Yes 40 9/15/2011 Britton SD 2 0 Yes Yes 41 9/15/2011 London KY 0 1 Yes No 42 10/6/2011 Steeleville IL 0 2 Yes No 43 12/7/2011 Henderson KY 1 3 Yes No 44 1/12/2012 Edmond OK 0 4 Yes No 45 3/20/2012 Ronda NC 0 4 Yes No 46 5/23/2012 Monroe OH 0 3 Yes Yes 47 8/28/2012 Simi Valley CA 0 1 No Yes 48 9/10/2012 Phoenix AZ 0 2 Yes Yes 49 10/9/2012 East Rutherford NJ 0 7 Yes Yes 50 12/28/2012 Cincinnati OH 1 1 Yes Yes TOTAL 29 161

CSB • AL Solutions Case Study 31 AL Solutions Case Study Final Investigation Report July 2014 CSB Investigation Reports are formal detailed reports on significant chemical accidents and include key findings, root causes, and safety recommendations. CSB Hazard Investigations are broader studies of significant chemical hazards. CSB Safety Bulletins are short general interest publications that provide new or noteworthy information on preventing chemical accidents. CSB Case Studies are short reports on specific accidents and include a discussion of relevant prevention practices. All reports may contain safety recommendations if appropriate. CSB Investigation Digests are plain-language summaries of Investigation Reports. The U.S. Chemical Safety and Hazard Investigation Board (CSB) is an independent Federal agency whose mission is to ensure the safety of workers, the public, and the environment by investigating and preventing chemical incidents. The CSB is a scientific investigative organization; it is not an enforcement or regulatory body. Established by the Clean Air Act Amendments of 1990, the CSB is responsible for determining the root and contributing causes of accidents, issuing safety recommendations, studying chemical safety issues, and evaluating the effectiveness of other government agencies involved in chemical safety. No part of the conclusions, findings, or recommendations of the CSB relating to any chemical accident may be admitted as evidence or used in any action or suit for damages. See 42 U.S.C. § 7412(r)(6)(G). The CSB makes public its actions and decisions through investigation reports, summary reports, safety bulletins, safety recommendations, case studies, incident digests, special technical publications, and statistical reviews. More information about the CSB is available at www.csb.gov. CSB publications can be downloaded at www.csb.gov or obtained by contacting: U.S. Chemical Safety and Hazard Investigation Board Office of Congressional, Public, and Board Affairs 2175 K Street NW, Suite 400 Washington, DC 20037-1848 (202) 261-7600

FD06473 | 2014_美国_freedom-industries-chemical-release.pdf

分类:06_境外及港澳台调查报告 | 年份:2014 | 地域: | 严重程度: | 场所: | 起火原因: | 来源格式:pdf

U.S. CHEMICAL SAFETY AND HAZARD INVESTIGATION BOARD

INVESTIGATION REPORT REPORT NO. 2014-01-I-WV FEBRUARY 2017

CHEMICAL SPILL CONTAMINATES PUBLIC WATER SUPPLY IN CHARLESTON, WEST VIRGINIA OVER 300 MEMBERS OF THE PUBLIC SOUGHT MEDICAL TREATMENT FOR POTENTIAL EXPOSURE THE SPILL RESTRICTED WATER USE FOR NEARLY 300,000 RESIDENTS

FREEDOM INDUSTRIES, INC. CHARLESTON, WV JANUARY 9, 2014 KEY ISSUES: • TANK INSPECTIONS AND MAINTENANCE • RISK COMMUNICATION • PUBLIC WATER SYSTEMS SAFETY AND RISK ASSESSMENT • TOXICOLOGICAL INFORMATION

Freedom Industries, Inc. Investigation Report May 2017 ii

[This page intentionally left blank.]

Freedom Industries, Inc. Investigation Report May 2017 iii

Table of Contents

PREFACE………………………………………………………………………………………………….. x 1.0 EXECUTIVE SUMMARY............................................................................................................... 1 Incident Description .................................................................................................................................. 1 Consequences ............................................................................................................................................ 2 Key Findings ............................................................................................................................................. 3 Lessons Learned........................................................................................................................................ 5 Recommendations ..................................................................................................................................... 6 2.0 FACTUAL INFORMATION ........................................................................................................... 7 2.1 Incident Description ............................................................................................................................ 7 2.1.1 Leak Discovery ..................................................................................................................... 7 2.1.2 Leak Response ...................................................................................................................... 7 2.1.3 Consequences ...................................................................................................................... 10 2.2 Freedom Industries ............................................................................................................................ 12 2.2.1 Site History ................................................................................................................................ 13 2.2.2 Chemical Storage ....................................................................................................................... 17 2.2.3 Post-Incident Freedom Developments ....................................................................................... 20 2.2.4 Proximity to Water Treatment Intake and Transmission Main .................................................. 23 2.3 West Virginia American Water......................................................................................................... 25 2.3.1 Kanawha Valley Treatment Plant .............................................................................................. 25 3.0 TECHNICAL ANALYSIS ............................................................................................................. 28 3.1. Leak Quantity and Chemical Composition ...................................................................................... 28 3.2 Tank Failure Analysis ....................................................................................................................... 30 3.2.1 Tank Entry and Visual Inspection .............................................................................................. 30 3.2.2 Pitting Corrosion ........................................................................................................................ 33 3.2.3 Corrosion Rate Analysis ............................................................................................................ 35 3.2.4 Polyvinyl Acetate Material ........................................................................................................ 37 3.2.5 Frost Heave Effect, Flow and Leak Scenario ............................................................................. 39 3.2.6 Tank Integrity and Inspections ................................................................................................... 40 3.2.7 American Petroleum Institute Standards on AST Leaks ............................................................ 43 3.3 Tank Leak to the Elk River ............................................................................................................... 45 3.3.1 Site Geotechnical Analysis ........................................................................................................ 45 3.3.2 Secondary Spill Containment ..................................................................................................... 48 3.3.3 Culvert ........................................................................................................................................ 50 4.0 PUBLIC HEALTH CONSEQUENCE ANALYSIS ...................................................................... 54

Freedom Industries, Inc. Investigation Report May 2017 iv

  1. 1 Water Supply Contamination and Testing ........................................................................................ 54
  2. 2 Reported Symptoms after Drinking Water Exposure ....................................................................... 55
  3. 3 Using Available Toxicological Information to Determine Acceptable Levels for Acute Exposure . 58
  4. 4 Deficient Crisis and Risk Communication ........................................................................................ 61
  5. 4.1 Public Distrust of Drinking Water Safety .................................................................................. 65
  6. 5 Prior Chemical Release Incidents Investigated by CSB ................................................................... 66
  7. 6 AW and WVAW Response to Water Contamination ....................................................................... 68
  8. 6.1 American Water Works Company, Inc. ..................................................................................... 68
  9. 6.2 Use of Boil Water and Do Not Use Notices .............................................................................. 70
  10. 6.3 WVAW’s Monitoring and Testing Process ............................................................................... 72
  11. 6.4 AW and WVAW Emergency Preparedness and Response ........................................................ 74
  12. 7 American Water Works Association ................................................................................................. 79
  13. 0

REGULATORY ANALYSIS ......................................................................................................... 81 5.1 Regulatory Summary of Crude MCHM and PPH, stripped .............................................................. 81 5.2 Regulation of Aboveground Storage Tanks ...................................................................................... 82 5.2.1 Groundwater Protection Rule ..................................................................................................... 83 5.2.2 West Virginia’s Aboveground Storage Tank Act ...................................................................... 84 5.3 Clean Water Act ................................................................................................................................ 93 5.3.1 National Pollutant Discharge Elimination System Program ...................................................... 93 5.4 Safe Drinking Water Act................................................................................................................... 96 5.4.1 Source Water Assessment Program ........................................................................................... 96 5.5 Emergency Planning ......................................................................................................................... 99 5.5.1 Emergency Planning and Community Right-to-Know Act ....................................................... 99 5.5.2 Emergency Planning in West Virginia ..................................................................................... 102 5.6 Chemical Regulation under the Toxic Substances Control Act ...................................................... 105 5.6.1 TSCA Prior to 2016 ................................................................................................................. 105 5.6.2 Frank R. Lautenberg Chemical Safety for the 21st Century Act ............................................. 109 5.7 Occupational Safety and Health Administration............................................................................. 111 5.7.1 OSHA’s Hazard Communication Standard ............................................................................. 111 5.7.2 Flammable and Combustible Liquids under 29 C.F.R. § 1910.106 ......................................... 115 6.0 KEY FINDINGS ........................................................................................................................... 117 7.0 LESSONS LEARNED .................................................................................................................. 119 8.0 RECOMMENDATIONS .............................................................................................................. 121 The American Water Works Association ............................................................................................. 121 American Water Works Company, Inc. ................................................................................................ 121 Eastman Chemical Company ................................................................................................................ 121 APPENDIX A: TANK LEAK TIMELINE .............................................................................................. 123

Freedom Industries, Inc. Investigation Report May 2017 v

APPENDIX B: FREEDOM OFFICIALS ................................................................................................. 126 APPENDIX C: LEAKING PIPES AND WATER MAIN BREAKS ....................................................... 127 APPENDIX D: TOXICOLOGY ............................................................................................................... 128 APPENDIX E: SPILL PREVENTION, CONTROL AND COUNTERMEASURE ............................... 130

List of Figures Figure 1. Timeline of leak response for January 9, 2014. Some event times are approximate. (Source: CSB) ............................................................................................................................................................ 10 Figure 2. Etowah River Terminal located between Barlow Drive and the Elk River. (Source: CSB) ....... 13 Figure 3. 2010 Etowah River Terminal site plot plan. (Source: Etowah River Terminal [adapted]) ......... 16 Figure 4. MCHM- and PPH, stripped-containing tanks at Freedom post-incident. (Source: CSB) ........... 17 Figure 5. A ShurFlot 944 tote located at the Freedom facility. (Source: WVDEP) .................................... 18 Figure 6. Crude MCHM Safety Data Sheet excerpt. (Source: Eastman Chemical 2011) ........................... 20 Figure 7. Demolition of the tanks at Freedom. (Source: Charleston Gazette) ............................................ 22 Figure 8. Freedom site post-demolition. (Source: Google)......................................................................... 22 Figure 9. Location of the WVAW water intake along the Elk River. (Source: WVAG)............................ 23 Figure 10. Approximate distance from the release at Freedom to the WVAW KVTP intake. (Source: Google Earth) .............................................................................................................................................. 24 Figure 11. Major service areas in West Virginia. (Source: WVAW) ......................................................... 25 Figure 12. A simplified process diagram of a water treatment plant. (Source: CSB) ................................. 27 Figure 13. The bottom of tank 396 with holes and pits identified. (Source: CSB) ..................................... 32 Figure 14. The bottom and shell wall of tank 396 with holes and pits identified through floor thickness. (Source: Powers) ......................................................................................................................................... 32 Figure 15. Cross-section of tank floor showing thickness variations from corrosion. (Source: Anamet) .. 34 Figure 16. Retrofitted welded bottom of tank 396 (inside of tank). (Source: CSB) ................................... 36 Figure 17. Tank 396 timeline. Original bottom replacement date based on 25-year service life. (Source: CSB). ........................................................................................................................................................... 37 Figure 18. Remnants of coating on interior tank floor. (Source: Anamet) ................................................. 37 Figure 19. Corrosion product beneath PVA. (Source: Anamet) ................................................................. 39 Figure 20. Gravel base under tank 396 and other tanks containing mixtures with Crude MCHM and PPH, Stripped. (Source: Terracon) ....................................................................................................................... 46 Figure 21. Permeability coefficients for different types of soils. (Source: Food and Agriculture Association) ................................................................................................................................................ 47 Figure 22. Low resistance flow path provided by gravel base. (Source: CSB) .......................................... 47 Figure 23. View from inside the dike wall facing the Elk River of the concrete block walls with no reinforcement (Left); dike wall along the tank farm parallel to the Elk River (Right). (Source: CSB) ...... 49 Figure 24. The dike walls that surrounded the tank farms were in poor condition. (Source: CSB) ........... 50 Figure 25. Ice-filled oil/water separator discharge pipe into the Elk River. (Source: WVDEP) ................ 51 Figure 26. Cross-section of culvert beneath the Freedom site between tanks 394 and 395. (Source: Civil & Environmental Consultants, Inc. January 20, 2014) ................................................................................... 52 Figure 27. Water flowing through a corrugated steel culvert extending from the hillside (Left); stormwater pipe above interceptor trench (Right). (Source: WVDEP) ......................................................................... 52

Freedom Industries, Inc. Investigation Report May 2017 vi

Figure 28. Photo taken on June 15, 2015, of remnants of the culvert that ran between tanks 394 and 395 beneath the site. (Source: CSB) .................................................................................................................. 53 Figure 29. Summary of emergency department visits, January 9-23, 2014. (Source: WVBPH/CDC) ...... 57 Figure 30. 4-MCHM levels in influent (river water) and finished water (final product) at WVAW KVTP on January 9-12, 2014. (Source: WVAW) .................................................................................................. 60 Figure 31. Equivalent concentrations of ppm, ppb and ppt notations. The CDC short-term screening level of 4-MCHM was 1 ppm. Studies regarding the odor threshold for 4-MCHM components suggest that some residents may have been able to smell odors in their water at levels as low as 0.060 ppb (60 ppt). (Source: CSB) ............................................................................................................................................. 61 Figure 32. DHHS/CDC crisis and emergency risk communication life cycle. (Source: CDC) .................. 62 Figure 33. Timeline of drinking water advisories and announcements issued to residents affected by the spill. (Source: CSB) .................................................................................................................................... 64 Figure 34. States in which AW operates. (Source: AW) ............................................................................ 70 Figure 35. Breakdown of all registered ASTs in West Virginia by tank level as of August 2016. (Source: WVDEP) ..................................................................................................................................................... 86 Figure 36. Level 1 tanks in West Virginia and Reason for Designation as of August 2016. (Source: WVDEP) ..................................................................................................................................................... 88 Figure 37. WVAW–KVTP susceptibility ranking. (Source: WVAW) ....................................................... 97

List of Tables Table 1. AST Conditions: Former PQS Etowah Terminal and Freedom in 2014 ...................................... 14 Table 2. PQS and ERT Environmental Permits and Reports ...................................................................... 15 Table 3. Crude MCHM Compounds and Percent Concentration from Eastman SDS (Revised August 18, 2011). .......................................................................................................................................................... 19 Table 4. Total Estimated Volume of Material Released. ............................................................................ 29 Table 5. Summary of Reported Qualitative and Quantitative Chemical Analyses of Tank 396 Contents. 30 Table 6. API Standards, Recommended Practices and Publications Addressing Spill and Leak Prevention, Detection or Containment for ASTs or AST Facilities. .............................................................................. 43 Table 7. Results for MCHM Samples around Culvert ................................................................................ 53 Table 8. Symptoms Reported to Emergency Department, January 9-23, 2014 (Source: WVBPH/CDC).. 57 Table 9. Applicability of Various Federal Regulations to MCHM Stored at Freedom .............................. 81 Table 10. EPCRA Chemicals and Reporting Thresholds (Source: EPA) ................................................. 100 Table 11. Detailed MCHM Leak Timeline ............................................................................................... 123 Table 12. Summary of Freedom Fines and Charges ................................................................................. 126 Table 13. Typical Duration of Toxicological Studies ............................................................................... 128

Freedom Industries, Inc. Investigation Report May 2017 vii

Acronyms and Abbreviations ⁰C degrees Celsius ⁰F degrees Fahrenheit AAR After Action Report ANSI American National Standards Institute API American Petroleum Institute ASCE American Society of Civil Engineers AST aboveground storage tank ATSDR Agency for Toxic Substances Disease Registry AW American Water AWWA American Water Works Association BWN Boil Water Notice CASPER Community Assessment for Public Health Emergency Response CDC Centers for Disease Control and Prevention CERC Crisis and Emergency Risk Communication CERCLA Comprehensive Environmental Response, Compensation, and Liability Act CMP Consequence Management Plan CHDM Cyclohexane Dimethanol CSB Chemical Safety Board CWA Clean Water Act DHHS Department of Health and Human Services DNU Do Not Use EHS extremely hazardous substance EJHA Environmental Justice Health Alliance for Chemical Policy Reform EMP Event Management Practice EPA Environmental Protection Agency EPCRA Emergency Planning and Community Right-to-Know Act EPM Emergency Preparedness Manual ERT Etowah River Terminal FD Fire Department FEMA Federal Emergency Management Agency GAC granular activated carbon GAO Government Accountability Office GC gas chromatography GC-MS gas chromatography mass spectrometry

Freedom Industries, Inc. Investigation Report May 2017 viii

GHS Globally Harmonized System of Classification and Labeling of Chemicals Gpm gallons per minute GPP Groundwater Protection Plan GPR Groundwater Protection Rule HCS Hazard Communication Standard ICR Information Collection Request ICS Incident Command System KCHD Kanawha Charleston Health Department KMnO4 potassium permanganate KPEPC Kanawha Putnam Emergency Planning Committee KVTP Kanawha Valley Treatment Plant LD lethal dose LDS leak detection system LEPC Local Emergency Planning Committee LRMRC Legislative Rule-Making Review Committee MCHM methylcychohexanemethanol MGD million gallons per day MIC methyl isocyanate mpy mils per year MSDS material safety data sheet NTP National Toxicology Program NIMS National Incident Management System NOEL No Observed Effect Level NOV Notice of Violation NPDES National Pollutant Discharge Elimination System NRC Nuclear Regulatory Commission NRDC Natural Resources Defense Council OEHS Office of Environmental Health Services OSHA Occupational Safety and Health Administration PAC powder activated carbon PCACS People Concerned About Chemical Safety PMN premanufacture notice Ppb parts per billion PPH, stripped polyglycol ethers Ppm parts per million Ppt parts per trillion

Freedom Industries, Inc. Investigation Report May 2017 ix

PQS Pennzoil-Quaker State PSC Public Service Commission PWSSSC Public Water System Supply Study Commission PVA polyvinyl acetate SARA Superfund Amendments and Reauthorization Act SB Senate Bill SDS safety data sheet SDWA Safe Drinking Water Act SERC State Emergency Response Commission SLTC Salt Lake Technical Center SNUN significant new use notice SPCC Spill Prevention, Control, and Countermeasure SPRP Spill Prevention Response Plan STI Steel Tank Institute SWAP Source Water Assessment Program SWAR Source Water Assessment Report SWPPP Stormwater Pollution Prevention Plan TPQ threshold planning quantity TSCA Toxic Substances Control Act UCMR3 Third Unregulated Contaminant Monitoring Rule WHEAT Water Health Economic Assessment Tool wt% weight percent WVAG West Virginia Office of the Attorney General WVAW West Virginia American Water WVBPH West Virginia Bureau of Public Health WVDEP West Virginia Department of Environmental Protection WVDHHR West Virginia Department of Health and Human Resources ZCC zone of critical concern ZPC zone of peripheral concern

Freedom Industries, Inc. Investigation Report May 2017 x

PREFACE With the acceptance of public comments and the release of the Freedom Industries investigation report at a public meeting on September 28, 2016, in Charleston, West Virginia, Chemical Safety Board (CSB) Board Members committed to considering an addendum to the report after addressing any additional written comments received in the 48-hour period following the public meeting. The investigative team has reviewed all comments received and at the request of the Board, made the changes found herein. This preface explains some of the activities initiated in response to the incident, prior to CSB’s arrival. These activities, directed towards mitigating the effects of the spill, presented the investigative team with challenges in determining the composition of the spilled tank contents. The preface also outlines additional information that supplements previous material contained in the Freedom Industries investigation report. Finally, minor editorial corrections were made throughout the revision of the report that includes the timeline of events and portions of Section 3 which were re-ordered for continuity and clarity. Early Mitigation Efforts and Tank Sample Characterization The Freedom Industries investigation report is modified to add context to characterization of the tank sample. Although CSB’s notification of the incident and subsequent information gathering through calls to responding agencies began on Thursday, January 9, 2014, a decision to launch an investigative team to the Freedom site was not made until January 12, 2014, and the team arrived at the site on Monday, January 13, 2014. By this time, all material from tanks 395, 396, and 397 had already been transferred to Baker storage containers at Freedom’s Poca facility as part of Freedom’s emergency response and clean- up efforts. Therefore, CSB was not able to gather independent samples of material directly from the tanks at Freedom. Accordingly, the CSB partnered with Occupational Safety and Health Administration (OSHA) inspectors on site to obtain a sample of material from one of the Baker storage containers purported to contain material from tank 396. As is standard under OSHA authority, the objective of the OSHA sampling was limited to compliance purposes and, as a result, did not address the identification of the unknown chemicals in the sample tested. CSB did not pursue any additional testing and cannot report any findings beyond what OSHA provided. A summary of the OSHA analysis is in Section 3.1. When the leak was discovered, Freedom began efforts to remove all materials from tanks 395, 396, and 397 with vacuum trucks provided by a contractor to mitigate the source of chemicals flowing into the Elk River. It was communicated to CSB that, due to exigent circumstances, the vacuum trucks were not cleaned prior to transport. At the Freedom Poca facility, recovered tank contents were transferred from the vacuum trucks into Baker storage containers, as previously mentioned. Although documentation from OSHA states that the contents of tank 396 were transferred to an individual Baker storage container, CSB was not present to observe and verify the transfer. Likewise, there is no record that the Baker storage containers at the Poca facility were cleaned prior to receiving the transferred material. Thus, assurances cannot be made that the contents of any of the three tanks were free from contamination of any material present in the vacuum trucks or containers that were emptied or used on the day of the incident.

Freedom Industries, Inc. Investigation Report May 2017 xi

Leak Quantity

Early estimates of the quantity of chemicals spilled provided by Freedom Industries ranged from about 1,000 gallons to 10,000 gallons over a 12-day period immediately after the incident occurred. A closer examination of T-396 inventory on January 8, 2014, and the amount of transferred mixture recovered in the Baker tank at the Poca site yielded a net loss of about 11,000 gallons. The breakdown of chemicals and volume of each can now be found in Table 4, and the newer quantity spilled is reflected throughout the report.

Estimated Time to leak 11,000 Gallons Based on estimated leak rates through the two holes noted on the floor of T-396 (0.4 and 0.75-inches diameter) the amount of time for 11,000 gallons to be released was revised to between 6 and 8 hours from the previous estimate of 24 hours. The details of these estimates are presented in Section 3.2.5. Release of Contractors’ Reports Contractor reports that documented metallurgical evaluation for portions of the tank involved in the release and inspection reports for all three tanks in Crude MCHM service at the time of the incident are released on January 25, 2017, with the revised Freedom Industries report and can be found on the CSB website at this location. Nomenclature The report is modified throughout to clarify the characterization of the material that leaked into the Elk River. The team footnoted early in the original report that, “Although Shurflot 944 is the product name for the material that leaked from tank 396, this report refers to the leaked material as Crude Methylcychohexanemethanol (MCHM). MCHM is commonly used when referring to this incident and MCHM makes up the greatest percentage of Shurflot 944.” Though the report used this convention, the team recognizes that the released material was a mixture of chemicals containing Crude MCHM and polyglycol ethers (PPH, stripped). In order to ensure greater clarity and minimize the likelihood of mischaracterizing the material that leaked into the Elk River, the team has reviewed each reference of the leaked material and made changes where necessary. Breaches of Underground Pipe and Odor Complaints On January 31, 2014, during mitigation of the site, there was a breach of an underground pipe by a backhoe that is thought to have released material that mirrored that which was released from T-396 on January 9, 2014. The quantity that was released was estimated to be in the “tens of gallons” range by the Director of Emergency Response and Homeland Security. Workers contained the release in a cutoff trench, and it did not reach the Elk River. There were multiple complaints throughout the first month from citizens of smelling a strong licorice-like aroma in the Charleston area. While some of these events came to the attention of CSB investigators, none were directly attributable to the release of January 9th, or indicated a resumption of spillage from the tanks involved.

Freedom Industries, Inc. Investigation Report May 2017

1

  1. 0 EXECUTIVE SUMMARY

Incident Description On January 9, 2014, West Virginia Department of Environmental Protection (WVDEP) inspectors arrived at the Freedom Industries (Freedom) chemical storage and distribution facility in Charleston, West Virginia, in response to complaints from the public about a chemical odor. Upon arrival, WVDEP inspectors discovered a chemical leaking from tank 396, an aboveground storage tank (AST). The leaking tank contents were originally reported as crude methylcychohexanemethanol (MCHM),1 but 13 days later Freedom reported it was a mixture of Crude MCHM2 and polyglycol ethers (PPH, stripped),3,4 called Shurflot 944.5 The chemical mixture escaped tank 396 through two small holes on the tank floor and traveled down a descending bank into the adjacent Elk River. The holes were caused by pitting corrosion6 that initiated on the internal surface of the tank floor. The tank contents drained into the gravel and soil surrounding tank 396 and found multiple pathways into the river. The secondary containment or dike wall, originally designed to control leaks, had cracks and holes from disrepair that allowed the mixture, containing Crude MCHM and PPH, stripped, to escape the containment. The leak also found a pathway to the river through a subsurface culvert,7 located under adjacent ASTs.

After prompting by WVDEP, Freedom took action to stop the leak and prevent further contamination by deploying services to recover the spill and vacuum the remaining tank contents. However, nearly 11,000 gallons of a mixture containing Crude MCHM and PPH, stripped had already entered into the surrounding soil and Elk River. Once in the river, it flowed downstream to the intake of the West Virginia American Water (WVAW) water treatment facility, about 1.5 miles downriver from Freedom. WVAW’s water treatment and filtration methods were unable to treat and remove all of the chemical mixture in its water treatment process and as a result, it contaminated the drinking water within WVAW’s distribution system. That evening, WVAW issued a Do Not Use (DNU) order for 93,000 customer accounts (approximately 300,000 residents) across portions of nine counties.

1 According to the Eastman Safety Data Sheet, Crude MCHM has a licorice and alcohol-like smell that is detectable at concentrations as low as 0.15 part per billion. Eastman Chemical. Safety Data Sheet for Crude MCHM. Revised 9/15/2016. http://ws.eastman.com/ProductCatalogApps/PageControllers/MSDS_PC.aspx?Product=71014291 (February 2, 2017) 2 Crude MCHM is a mixture of chemicals. See Table 3 for the range of expected concentrations of the various components that make up Crude MCHM. 3 Crude MCHM and PPH, stripped are used in froth flotation to assist in the removal of impurities in coal for the mining industry. 4 West Virginia Department of Environmental Protection. News Bulletin. http://www.dep.wv.gov/news/Pages/Freedom-verifies-two-chemicals-(Crude-MCHM,-PPH)-in-tank.aspx (September 7, 2016). 5 Although Shurflot 944 is the product name for the material that leaked from tank 396, this report refers to the leaked material as a mixture of Crude MCHM and PPH, stripped. 6 Pitting corrosion is a form of localized corrosion that leaves deep pits or holes in the surface of a metal. 7 A culvert is a tunnel or pipe that is located under a structure and used to direct water, usually to prevent flooding of a highway, street or road.

Freedom Industries, Inc. Investigation Report May 2017

2

Consequences After the issuance of the DNU order, hospital emergency departments reported an increase in patient visits.8 Public health officials reviewed 369 records of emergency room visits in 10 local hospitals between January 9 and January 23, 2014. The records included patients who reported one or a combination of symptoms including nausea, rashes, vomiting, abdominal pain and diarrhea following exposure to the water through inhalation, ingestion and/or skin contact.9 Although hospitals could not confirm if the chemicals in tank 396 caused the documented symptoms, public health agencies concluded that the symptoms appeared to correspond with the first few days of the incident. The Safety Data Sheet (SDS) for Crude MCHM lists eye, skin and respiratory irritation as hazards from exposure to undiluted MCHM.10

In addition to the symptoms reported immediately following the leak into the public water supply, residents affected by the DNU order were advised to restrict usage of tap water for drinking, cooking and bathing for four to nine days, depending on their location. The DNU order resulted in closures of many businesses, schools and public offices. The Federal Emergency Management Agency (FEMA), the West Virginia National Guard, other state agencies and WVAW worked to ensure affected residents had water available. Some residents reported that the unpleasant and highly detectable licorice odor of spilled chemical components remained in the water for several weeks following the leak, even after residents flushed their piping as requested by WVAW and the West Virginia Department of Health and Human Resources (WVDHHR). In a survey conducted by the West Virginia Bureau of Public Health (WVBPH) and the Centers for Disease Control and Prevention (CDC), many residents reported belief that the water was not safe to drink after WVAW lifted the water restrictions.11

Freedom’s communication to the public, state and federal agencies, WVAW and first responders regarding the chemicals and quantity of chemicals involved in the leak was deficient. Freedom failed to

8 West Virginia Department of Public Health and Agency for Toxic Substances and Disease Registry. Elk River Chemical Spill Effects. http://www.dhhr.wv.gov/News/chemical- spill/Documents/ElkRiverMedicalRecordSummary.pdf (July 8, 2016). 9 West Virginia Department of Health and Human Resources. Findings of Emergency Department Record Review from Elk River Chemical Spill. http://www.wvdhhr.org/communications/news_releases/DHHR%20Press%20Release%20- %20Findings%20of%20Emergency%20Department%20Record%20Review%20from%20Elk%20River%20Chemi cal%20Spill.pdf (July 9, 2016). 10 Eastman Chemical Company. Safety Data Sheet for Crude MCHM. Version 2.0. August 18, 2011. Safety Data Sheets, formerly known as Material Safety Data Sheets (MSDS), contain important information about the hazards of chemicals in a uniform format. SDSs must contain information such as chemical identification, first aid and firefighting measures, physical and chemical properties and toxicological information among other categories. In addition, SDSs must be readily accessible to employees and emergency responders. The Hazard Communication Standard was recently updated to conform to the Globally Harmonized System Classification and Labeling of Chemicals (GHS). The GHS uses the term “Safety Data Sheet” and therefore the regulation no longer uses the term “Material Safety Data Sheet.” For purposes of this report, any safety sheet will be referred to as an SDS despite the fact it may not comply with the updated format and was referred to as an MSDS at the time of the spill. 11 Center for Disease Control and Prevention. Disaster Response and Recovery Needs of Communities Affected by the Elk River Chemical Spill. http://www.dhhr.wv.gov/News/2014/Documents/WVCASPERReport.pdf (July 9, 2016).

Freedom Industries, Inc. Investigation Report May 2017

3

immediately communicate information about all the chemicals present inside tank 396 and did not inform the public that the second chemical, a mixture of polyglycol ethers, (PPH, stripped), was also present in tank 396 until 12 days after leak discovery. Freedom instead provided the SDS for Crude MCHM to WVAW and emergency responders after the spill. The SDS for Crude MCHM was the only available information about the spilled chemicals at the time of the incident, and offered little information to immediately establish the threat to humans.

At the request of WVBPH, CDC used the available toxicological information on the Crude MCHM SDS to recommend a screening level of 4-MCHM at 1 part-per-million (ppm). Eastman Chemical Company, the Crude MCHM manufacturer, voluntarily conducted toxicological testing on Crude and 4-MCHM prior to the incident and made those studies available to public health officials on the evening of January

  1. Though not required to do so, Eastman’s tests did not include studies at low doses that would have

assisted public health professionals in promptly communicating the risk of exposure when residents began reporting symptoms. Freedom continued to revise its estimate of the quantity released, which increased from about 1,000 to 10,000 gallons over the course of 12 days. The CSB ultimately estimated the leaked volume to be almost 11,000 gallons. Key Findings Chemical Safety Board (CSB) investigators gathered information to understand both the technical cause of the incident as well as the role of WVAW and federal, state and local agencies when responding to the contaminated water supply. In examining these issues, CSB identified the following key findings:

  1. At Freedom Industries, a mixture containing Crude MCHM and PPH, stripped leaked from an

aboveground storage tank (tank 396) through two holes. These holes, measuring approximately 0.75 and 0.4 inches in diameter, formed due to pitting corrosion that degraded the thickness of the tank floor from the interior. Although the soil side of the tank bottom was corroded as most tank bottoms are, the amount of soil side corrosion was insignificant compared to the pitting corrosion that directly led to the incident.

Once the mixture escaped tank 396, it moved through the soil beneath the tank and migrated to the Elk River through two pathways: (1) the failing secondary containment wall located between tank 396 and the Elk River, and (2) a deteriorated underground culvert located around tank 396.

CSB found no documentation of prior inspections or maintenance conducted by Freedom or the prior facility owner, Etowah River Terminal (ERT), which would have identified and addressed internal corrosion in tank 396. Such inspections and maintenance could have identified and addressed the interior corrosion and holes in tank 396.

Freedom was required to maintain adequate secondary containment under the West Virginia/National Pollutant Discharge Elimination System (NPDES) General Water Pollution Control Permit’s Stormwater Pollution Prevention Plan and the Groundwater Protection Rule. Freedom was aware of the deteriorated secondary containment wall but did not repair it prior to the incident. CSB found no evidence that Freedom or ERT implemented a Stormwater Pollution Prevention Plan or Groundwater Protection Plan. WVDEP did not inspect the site for compliance

Freedom Industries, Inc. Investigation Report May 2017

4

with these programs due to resource constraints.

Freedom did not have any leak prevention or leak detection system in place to immediately provide notification of tank leaks.

Once the mixture containing Crude MCHM and PPH, stripped entered the Elk River, it flowed into WVAW’s water intake, located about 1.5 miles away from the Freedom facility site. The water treatment process was not capable of fully treating and removing the chemicals. This allowed the mixture to contaminate the drinking water.

WVAW and WVBPH decided WVAW could not shut down its drinking water treatment system because there was no alternative raw water supply and doing so could have compromised fire protection and sanitation. In addition, depressurizing the water distribution system would have caused extensive damage and further delays in water restoration. Accordingly, a “Do Not Use” order was issued less than two hours after WVAW detected odors in the treated water intended for distribution.

The DNU order was not issued immediately because WVAW was mistakenly informed that Crude MCHM was a flocculant, rather than a frothing agent, and that only 1,000 gallons was released. WVAW assumed its water treatment and filtration system was capable of fully treating and removing the chemicals from the water.

Source water protection efforts vary by state, and as a result, surface water treatment plants across the United States are subject to different requirements to protect drinking water sources. In response to new state requirements after the Freedom incident, WVAW submitted a source water protection plan to WVBPH that goes beyond existing federal requirements. Because American Water (AW) provides guidance and some oversight through required policies to its subsidiary water utilities across the United States, AW is well positioned to establish requirements for its subsidiary surface water treatment plants to develop and implement plans similar to WVAW’s plan to ensure they are adequately prepared for potential contamination events.

Local, state and federal public health officials only had information from Eastman’s Crude MCHM Safety Data Sheet and later, toxicological studies, to communicate to the public and credibly determine the risk of exposure. As the crisis evolved, residents in the Charleston area were given unclear and conflicting announcements because of the changing information from Freedom and government agencies, which increased public uncertainty about the safety of the drinking water.

The American Water Works Association, a nonprofit scientific and educational association for managing and treating water, is well positioned to assist water utilities by disseminating important lessons that are learned from chemical contamination incidents that could potentially affect a drinking water distribution system.

Freedom Industries, Inc. Investigation Report May 2017

5

Lessons Learned CSB’s investigation of Freedom led the agency to find several issues related to identifying and assessing hazardous chemicals stored near water treatment intakes, as well as responding to and communicating public health risks during drinking water contamination incidents. Since the incident, the State of West Virginia, WVAW, and other agencies and organizations have established requirements and implemented practices that have addressed many of the gaps that CSB identified early in its investigation. Because requirements regarding ASTs and source water protection vary by state, CSB has developed the following key lessons for AST owners and operators, state governments, drinking water utilities and public health officials across the United States to use so that they are adequately prepared for, can respond to and are able to effectively communicate the public health risks of an incident involving the release of a hazardous chemical near a drinking water source.

  1. AST owners and operators of facilities storing chemicals near drinking water sources should

establish regular inspection programs and routinely monitor tanks and secondary containment to verify tank integrity and containment of leaks. They should coordinate with nearby water utilities and emergency response organizations to ensure that the information about their stored chemicals (e.g., chemical characteristics, quantity, and toxicological information) is communicated and can be made immediately available in the event of a leak.

AST owners and operators covered under existing regulatory programs (e.g., Spill Prevention, Control, and Countermeasure; National Pollutant Discharge Elimination System) should ensure that the associated spill prevention and protection plans under those programs are updated and implemented to reduce the potential for leaks from ASTs and secondary containment.

Due to the large number of existing chemicals in commerce, the Environmental Protection Agency’s review of all chemicals under the federal Toxic Substances Control Act could take years. Many of these chemicals lack toxicological information; therefore, states should take immediate action to protect source waters and the public from these unknown and potentially hazardous chemicals. This can be achieved through increased inspections and enforcement at chemical storage facilities near water sources and coordination between emergency response organizations and public health agencies.

States should establish Source Water Assessment Programs that mandate source water protection planning by water utilities. States should ensure that water utilities have full and simple access to the data necessary to support this mandate. Water utilities should complete Source Water Protection Plans that include the following components:

a. System operational information; b. Source water delineation and characterization; c. Potential significant sources of contamination; d. Management strategies; e. Source water monitoring; f. Communications and contingency; and g. Alternate sources of supply.

Freedom Industries, Inc. Investigation Report May 2017

6

Source Water Protection Plans should be updated at least every three years or when there is a substantial change in the potential sources of significant contamination within the identified zone of critical concern.

Water utilities should engage with their Local Emergency Planning Committee and/or State Emergency Response Commission to obtain Tier II information and use that information to identify water intakes that could potentially be at risk of contamination from those chemicals in the event of a spill.

Water utilities should assess the capabilities of their water treatment systems to treat and remove potential leaks from all potential sources of significant contamination within their zone of critical concern. Where feasible, water utilities should use established laboratory analytical methods to detect the presence or measure the concentration of potential hazardous chemicals or classes of hazardous chemicals.

Public health agencies should coordinate with water utilities, emergency response organizations and facilities that store chemicals near drinking water sources to ensure that information concerning chemicals and potential risks to the public are immediately available in the event of a spill. They should establish a communication framework to ensure information, as it becomes available, is communicated through one entity or organization. Recommendations As a result of the causes and findings of this investigations, CSB makes recommendations to the following recipients (see Section 8 for the full language of the recommendations):

The American Water Works Association

American Water Works Company, Inc.

Eastman Chemical Company

Freedom Industries, Inc. Investigation Report May 2017

7

  1. 0 FACTUAL INFORMATION
  2. 1 Incident Description
  3. 1.1 Leak Discovery

On January 9, 2014, WVDEP received an air quality complaint of an odor suspected of coming from the Freedom facility in Charleston, West Virginia (Figure 1).12 At about 10:00 AM that same morning, the Kanawha County Metro 911 call center received reports of a chemical odor at the intersection of Interstates I-77 and I-79 in Charleston, about 1.5 miles from the Freedom site. WVDEP inspectors arrived at the Freedom site around 11:05 AM and met with the President of Freedom to discuss the odor complaints. At about the same time, a Freedom employee informed the Freedom President of the leaking tank, initially reported to contain Crude MCHM. The Freedom President escorted WVDEP to the suspected leak location near tank 396, where inspectors observed an ongoing leak that was described as an upwelling, “fountain-like” flow into a 400-square-foot pool of liquid estimated to be three or four inches deep. WVDEP noted that the northwest corner of the leak pool was continuously flowing into a 12-inch-diameter underground culvert and seeping under and through a secondary containment13 wall surrounding the ASTs into the adjacent Elk River. The Elk River is a tributary of the Kanawha River, which in turn is a tributary of the Ohio River.

Freedom personnel used a cinder block and a single bag of absorbent in an attempt to contain the flowing chemicals seeping from the containment wall. This method proved immediately ineffective as the absorbent bag floated away. Freedom had no additional leak containment supplies onsite. WVDEP inspectors determined that the spill threatened the local public water supply intake at the WVAW water treatment facility, located about 1.5 miles downstream14 and ordered Freedom to remediate the site. At 11:56 AM, WVDEP notified the Water Quality and Environmental Compliance Supervisor for WVAW (WVAW Supervisor) of a Crude MCHM leak of an unknown quantity into the Elk River. When the WVAW Supervisor asked what Crude MCHM was, the WVDEP inspector indicated it was a flocculant15 or a coagulant. At about 1:05 PM, a vacuum truck arrived at Freedom to collect the pooled liquid and remaining tank contents. 2.1.2 Leak Response Upon notification of the leak, the WVAW Supervisor drove to the Freedom site to obtain more information. He later reported to CSB investigators that there was a noticeable sheen on top of the water

12 West Virginia Department of Environmental Protection. Air Quality Complaint Investigation Form. Complaint Number CH-2014-0193. 2014. http://www.courtswv.gov/supreme-court/clerk/pdf/cases-of-interest/covenant-v- huffman/14-0112Appendix.pdf (May 24, 2016). 13 Secondary spill containment is the containment of hazardous liquids in order to prevent soil and water pollution. Common techniques include the use of spill berms to contain oil-filled equipment, fuel tanks, truck washing decks or any other places or items that may leak hazardous liquids. 14 Downstream Strategies. The Freedom Industries Spill. http://www.downstreamstrategies.com/documents/reports_publication/freedom-spill-report_1-20-14.pdf (May 24, 2016). 15 Both used in water treatment, flocculants and coagulants assist in clumping together suspended solids or particulates to facilitate sedimentation.

Freedom Industries, Inc. Investigation Report May 2017

8

in the Elk River adjacent to the leak location. While onsite, he was again informed that the tank material was a flocculant. The WVAW Supervisor was familiar with the term because WVAW uses flocculants on a routine basis.

The WVAW Supervisor called WVAW treatment plant operators to update them about the leak and request that they turn on the powder activated carbon (PAC) and increase the potassium permanganate feed as a precaution. There were printer issues at Freedom, and the WVAW Supervisor did not view a hard copy of the Eastman Crude MCHM SDS until 1:00 PM that afternoon, about an hour after he arrived onsite.16 Freedom provided the WVAW Supervisor with an SDS for Crude MCHM, but at the time, did not disclose that fact that tank 396 contained a chemical mixture of Crude MCHM and PPH, stripped. Upon reviewing the SDS, the WVAW Supervisor concluded that the Crude MCHM characteristics were not consistent with what he would expect to see in a flocculant and informed the WVDEP of the presence of alcohols in the material. At some point later while at the Freedom site, someone working onsite, possibly a representative from Freedom or a trucking company, informed the WVAW Supervisor that tank 396 contained a frothing agent, not a flocculant. Frothing agents are used in the mining industry to separate coal from rock—they create foam or bubbles to which coal particulates attach and can be separated.17 Shortly after, WVDEP estimated that the quantity released was between 1,000 and 5,000 gallons.

Around 2:00 PM, WVAW operators reported a faint odor in the raw river water coming into the water treatment plant. Based on the estimated quantity spilled, available information about Crude MCHM and the status of water storage within the distribution system, WVAW decided to continue to monitor the water throughout the filtration process and relied on the PAC and water purification system to remove the odor and taste issues that may be associated with the chemical. Shortly after 4:00 PM, WVAW determined that the filters did not fully remove the chemicals. At around 5:00 PM, WVAW advised WVBPH and later the Governor’s Office that WVAW detected chemical odors in the water beyond the filters, and that the water distribution system might be contaminated.18 According to WVAW, shutting down the Elk River intake was not a viable option because of the impact it would have on fire protection and sanitation; furthermore, this impact would have lasted longer had the system been depressurized due to closing the intake.

Shortly before 6:00 PM, WVAW, after consultation with the Governor’s Office, WVDEP and WVBPH, issued the DNU order. The DNU order applied to customers in nine counties that receive water from WVAW’s Kanawha Valley Treatment Plant (KVTP) and lasted up to nine days. On January 10, WVDEP issued violations to Freedom under the State of West Virginia Water Pollution Control Act, Groundwater

16 That day, staff from the City of Charleston and Kanawha County Office of Emergency Management obtained the current MCHM SDS and offered a copy to WVAW personnel, who stated they already had it. 17 Nalco Chemical Company. Process for Coal Flotation Using 4-methylcychohexanemethanol Frothers. https://www.google.com/patents/US4915825?dq=methylcyclohexanemethanol+froth&hl=en&sa=X&ved=0ahUK Ewid3O-Kor7NAhXGNiYKHXQ3D6EQ6AEIIDAA (July 8, 2016). 18 Office of the Governor. After Action Review. http://www.dhsem.wv.gov/West%20Virginia%20Public%20Water%20Supply%20Study%20Commission/Docum ents/After%20Action%20Review.PDF (February 3, 2017).

Freedom Industries, Inc. Investigation Report May 2017

9

Protection Act and Air Pollution Control Act. WVDEP found that the spill of a “chemical described as 4- MCHM” caused “conditions not allowable in the Elk River by creating odors in the vicinity of state waters, by requiring an unreasonable degree of treatment for the production of potable water.”19 WVDEP also issued a notice of violation to Freedom for discharging an air pollutant that caused an objectionable odor at any location occupied by the public.20 WVDEP ordered Freedom to immediately remove the material from the ASTs and submit a site remediation plan within 24 hours.

WVBPH requested that CDC recommend a safe drinking water level for 4-MCHM based on the Crude MCHM SDS, the only information available shortly after leak discovery. 4-MCHM is the main component of Crude MCHM, making up 68 to 89% concentration.21The state obtained and adopted from CDC a 1 ppm short-term screening level concentration for 4-MCHM in drinking water during the afternoon of January 10. WVAW, the National Guard and private labs developed a method to test for 4- MCHM in drinking water, which began analyzing samples later that day. WVAW developed a systematic distribution system flushing program using hydraulic models that allowed WVAW to predict where the chemical was located and remove it from the distribution system. Once zones within the distribution system had multiple test results below the CDC limit, customers were allowed to flush their home plumbing. On January 13, WVAW and WVDHHR advised residents to flush their pipes before using the water. On January 15, WVBPH and CDC issued a drinking water advisory cautioning pregnant women to drink bottled water until “there are no longer detectable levels of MCHM in the distribution system.”22 On January 21, 2014—three days after the DNU order was lifted—the President of Freedom announced that another chemical mixture, PPH, stripped, was also released into the Elk River during the initial spill.23 The detailed leak discovery and response timeline of events is depicted in Appendix A.

19 Department of Environmental Protection. Order Issued under the Water Pollution Control Act and the Groundwater Protection Act. http://www.dep.wv.gov/pio/Documents/Freedom%20Industries%20Order%208028.pdf (July 8, 2016). 20 Department of Environmental Protection. Notice of Violations to Freedom Industries. January 10, 2014. 21 Eastman Chemical. Safety Data Sheet for Crude MCHM. Revised 9/15/2016. http://ws.eastman.com/ProductCatalogApps/PageControllers/MSDS_PC.aspx?Product=71014291 (February 2, 2017) 22 State of West Virginia Department of Health and Human Resources Bureau for Public Health Commissioner Office. Water Advisory for Pregnant Women. http://www.dhsem.wv.gov/Documents/Advisory%20-%201-15- 2014.pdf (July 8, 2016). 23 West Virginia Bureau of Public Health. CDC Statement on PPH. http://www.dhhr.wv.gov/News/chemical- spill/Documents/CDCstmtonPPH.pdf (July 8, 2016).

Freedom Industries, Inc. Investigation Report May 2017

10

Figure 1. Timeline of leak response for January 9, 2014. Some event times are approximate. (Source: CSB) 2.1.3 Consequences As a result of the spill, residents and visitors in the Charleston area served by WVAW were advised to restrict their tap water usage, and many people who ingested or bathed in the water before or during the water use restrictions reported various symptoms.24 Animal toxicological studies dermal and eye irritation at high concentrations of both Crude and pure (distilled) MCHM.25 During the spill, residents contacted the West Virginia Poison Center reporting rashes, nausea, vomiting, diarrhea and other symptoms.26

24 According to the Agency for Toxic Substances and Disease Registry and WVBPH, “it was possible that the symptoms reported to be caused by exposure to MCHM could have been caused by other mild clinical illnesses such as a cold, flu or viral infections.” Agency for Toxic Substances and Disease Registry, West Virginia Bureau of Public Health, Elk River Chemical Spill Health Effects, Findings of Emergency Department Record Review. April 2014. http://www.dhhr.wv.gov/News/chemical-spill/Documents/ElkRiverMedicalRecordSummary.pdf (January 31, 2017). 25 Dennis J. Paustenbach, Bethany Winans, Rachel M. Novick & Steven M. Green (2015). The toxicity of crude 4- methylcyclohexanemethanol (MCHM): review of experimental data and results of predictive models for its constituents and a putative metabolite, Critical Reviews in Toxicology, 45:sup2, 1-55, DOI: 10.3109/10408444.2015.1076376. http://dx.doi.org/10.3109/10408444.2015.1076376 (February 7, 2017). 26 WV Poison Control Center and Midatlantic Center for Children’s Health and the Environment. Fact Sheet. February 2014. http://www.legis.state.wv.us/legisdocs/2014/committee/interim/water/Documents/Bureau%20for%20Public%20H ealth%20Packet.pdf (November 14, 2016).

Freedom Industries, Inc. Investigation Report May 2017

11

Immediately following the DNU order, area hospitals reported an increase in emergency room visits. Patients reported symptoms of nausea (most common), rash, vomiting, abdominal pain and diarrhea.27 Between January 9 and January 23, 2014, WVBPH and the Agency for Toxic Substances and Disease Registry (ATSDR) reviewed 584 emergency department records. Of those 584 records, 369 records were further analyzed for patients who had symptoms and reported exposure to the water. Of the 369 records analyzed, 13 patients were hospitalized for chronic conditions such as kidney, liver or lung disease, and the remaining 356 were treated and released after receiving intravenous fluids and/or medications for nausea or itching.28 WVBPH and ATSDR found that 52.6% of the patients reported exposure to the contaminated water while bathing, showering or other skin contact; 43.9% from eating, drinking or swallowing; and 14.6% through inhalation (see Section 4 for a description of the public health impact).29

The spill affected 93,000 customers (approximately 300,000 residents) in nine West Virginia counties,30 including roughly 51,40031 residents in Charleston, West Virginia, the state capital. In the days following the spill, local residents were given a number of drinking water announcements that were unclear and confusing.

Samples collected from the water distribution system in public buildings and schools on January 25 revealed that 4-MCHM levels were 50 parts per billion (ppb), consistently lower than the safe concentration established by CDC at 1 ppm. Despite these concentrations of 4-MCHM in the laboratory tests, many citizens continued to detect chemical odors in their tap water and reported remaining skeptical of the overall safety of the drinking water for several weeks following the incident.32

Immediately following the DNU order, the State of West Virginia was challenged with providing potable water to residents and healthcare facilities. Emergency responders made it a priority to provide water first to healthcare providers and schools so they could maintain continuous operations. FEMA, West Virginia National Guard, first responders, city governmental agencies, civic groups and multiple state agencies worked together to distribute water in 2,500,000 one-gallon jugs, 9,500,000 liter bottles and 19,000,000 bottles (16 ounces and smaller) to the public during the water use restrictions.33 Various stores were also

27 Agency for Toxic Substances and Disease Registry, West Virginia Bureau of Public Health, Elk River Chemical Spill Health Effects, Findings of Emergency Department Record Review. April 2014. http://www.dhhr.wv.gov/News/chemical-spill/Documents/ElkRiverMedicalRecordSummary.pdf (January 31, 2017). 28 Ibid. 29 Ibid. 30 Affected counties included Boone, Cabell, Clay, Jackson, Kanawha, Lincoln, Logan, Putnam and Roane. 31 2010 Census. http://www.census.gov/ (August 8, 2016). 32 Schade C.P., Wright N., Gupta R., Latif D.A., Jha A., et al. Self-Reported Household Impacts of Large-Scale Chemical Contamination of the Public Water Supply, Charleston, West Virginia, USA. May 2015. http://journals.plos.org/plosone/article?id=10.1371/journal.pone.0126744 (February 3, 2017); Office of the Governor. After Action Review. http://www.dhsem.wv.gov/West%20Virginia%20Public%20Water%20Supply%20Study%20Commission/Docum ents/After%20Action%20Review.PDF (February 3, 2017). 33 Office of the Governor. After Action Review. http://www.dhsem.wv.gov/West%20Virginia%20Public%20Water%20Supply%20Study%20Commission/Docum ents/After%20Action%20Review.PDF (February 3, 2017).

Freedom Industries, Inc. Investigation Report May 2017

12

able to stock large quantities of bottled water after the incident. Five other water treatment plants, including another WVAW facility and four publicly owned plants, provided additional water via 14 bulk water tankers to those affected by the DNU order. WVAW supplied bulk water for seven weeks following the spill.

In Charleston, the spill plume in the Elk River entered the Kanawha River and flowed down into the Ohio River. The United States Geological Survey and Ohio River Valley Water Sanitation Commission detected 4-MCHM in river water samples as far downriver as Louisville, Kentucky (about 400 miles downstream of the spill).34,35 2.2 Freedom Industries Freedom Industries, organized as a corporation in 1992, identified itself as a full-service producer of specialty chemicals for the mining, steel and cement industries. The company produced freeze conditioning agents, dust control suppressants, flotation reagents and water treatment polymers in addition to other specialty chemicals.36 Freedom had ownership of the facility for only nine days prior to the incident. On December 31, 2013, Freedom merged with the prior site owner, the Etowah River Terminal, LLC.37 At the site in Charleston, Freedom stored and sold Shurflot 944, a mixture containing Crude MCHM and PPH stripped, in addition to calcium chloride and glycerin.

Freedom temporarily stored chemicals in ASTs and carried out financial transactions between chemical manufacturers and end-users. Freedom was accessible by barge and truck, but all movement into and out of the site in recent history was conducted strictly by truck in bulk shipments. Material that arrived at the Freedom facility was discharged from the tank trucks into the storage tanks. The facility had two computer-controlled loading and unloading zones with elevated platforms that were sloped and graded to contain the contents of tank trucks. The inventory was measured as material was shipped to customers. When customer specifications required blending, pre-weighed tankers received the desired quantity of material and then took it to a blending facility. On the day of the incident, 19 employees were listed on the company roster; 18 of those were located onsite.

34 Forman William T., et al. Determination of (4-methylcyclohexyl) Methanol Isomers by Heated Purge-and-Trap GC/MS in Water Samples from the 2014 Elk River, West Virginia, Chemical Spill. July 2015. http://www.sciencedirect.com/science/article/pii/S0045653514012648 (September 8, 2016). 35 Schulte, Jerry G. ORSANCO’s Role in Source Water Protection, Emergency Response and the Protection of Drinking Water Utilities. http://www.rrt5.org/Portals/0/docs/ElkRiverSpill-ORSANCO.pdf (February 3, 2017). 36 Bloomberg. Company Overview of Freedom Industries. http://www.bloomberg.com/research/stocks/private/snapshot.asp?privcapId=4614734 (July 8, 2016). 37 Prior to the merger, Freedom and ERT were separate entities; however, both companies were owned by three of the same principals. On December 6, 2013, the equity in Freedom was acquired by Chemstream Holdings, which also acquired all of the membership interests in ERT. At the time of acquisition, Poca Blending, LLC (Poca), and Crete, LLC (Crete), were wholly owned subsidiaries of Freedom. On December 31, 2013, a corporate restructuring occurred pursuant to which Etowah, Poca and Crete were merged with and into Freedom, with Freedom as the sole surviving entity following the merger. The property, including tanks and related equipment, had been sold to Chemstream Holdings, which had acquired its ownership of the equity in Freedom and membership units of ERT just 34 days prior to the incident. The facility and the storage and distribution processes were not changed by Freedom after the purchase until the January 2014 incident.

Freedom Industries, Inc. Investigation Report May 2017

13

  1. 2.1 Site History

Dating back to the late 1930s, the site stored a variety of chemicals in ASTs under multiple owners and operators. The property is bordered to the north by a wooded area. To the east of the site is a railroad corridor and Barlow Drive. A steep wooded slope is located beyond Barlow Drive (Figure 2).

Figure 2. Etowah River Terminal located between Barlow Drive and the Elk River. (Source: CSB)

Residences are located immediately south of the site, while the Elk River is located along the western border.38 Elk Refining Company was the original owner of the facility and purchased various acreages of land between 1938 and 1947. Over time, varying sizes of ASTs were added as the facility grew. Prior to ERT’s ownership of the site, it was owned by Pennzoil-Quaker State (PQS) (formerly known as Pennzoil United, Inc.). PQS sold the land and equipment to ERT in 2001.39

The site consisted of a two-story warehouse/office building, a garage/storage building, asphalt parking lots, a graveyard, a fire (pump) house, a flare, a fuel loading rack, an oil loading rack, an oil/water separator, a dock, two former fire houses, a former pump house, a former loading rack, 19 ASTs and associated aboveground product piping. The ASTs at ERT were installed in 1938, 1940, 1945, 1950 and 1951, with the exception of an 8,000-gallon additive tank that was installed in 1991 (see Table 1). Table 1 identifies the 14 main ASTs located inside the diked areas and describes the AST contents in 2003 (before Freedom owned the facility) and in 2014 (after Freedom took ownership of the facility).

38 Shaw Environmental, Inc. Additional Site Characterization Former Pennzoil-Quaker State Etowah Terminal. November 2003. 39 The real estate purchase agreement was signed on October 5, 2001, by PQS.

Freedom Industries, Inc. Investigation Report May 2017

14

Table 1. AST Conditions: Former PQS Etowah Terminal and Freedom in 2014 Historical AST Conditions Storage Tank Number Year Installed Capacity (gallons) 2003 Contents 2014 Contents 392 1991 8,000 Additive N/A 393 1951 420,000 Kerosene Off Spec Glycerin Blends 394 1938 420,000 Kerosene Glycerin 395 1938 46,200 Bulk Oil Crude MCHM, PPH, stripped40 396 1938 46,200 Bulk Oil Crude MCHM, PPH, stripped 397 1938 46,200 Bulk Oil Crude MCHM, PPH, stripped 398 1945 420,000 Bulk Oil Glycerin 399 1940 420,000 Gasoline Glycerin 400 1940 420,000 Gasoline Glycerin 401 1940 420,000 Gasoline Glycerin 402 1940 420,000 Gasoline Weak Salt 403 1950 420,000 Diesel 28% Calcium Chloride 404 1950 420,000 Diesel 35% Calcium Chloride 405 1951 420,000 Diesel 38% Calcium Chloride

Stormwater drains located in the diked area and on the asphalt parking lot on the northern end of the site flowed into an oil/water separator located on the eastern side of the site, which then drained into the Elk River. Stormwater that fell on the asphalt parking lot located on the southern end of the site flowed into catch basins along the western edge of the facility and was discharged into the Elk River.41

ERT operated the site as a bulk storage terminal for freeze conditioning agents including ethylene glycol and calcium chloride solutions and was zoned for industrial use. The sale from PQS to ERT included all tanks on the site, including tanks 395, 396 and 397, which were subsequently used to store a mixture containing Crude MCHM and PPH, stripped for sale and distribution to various customers in the Charleston area. At the time of the sale, tanks used to store lubricant oil residue and diesel fuel (tanks 393, 394, 395, 396, 397, 403, 404 and 405) were not cleaned by PQS. If ERT were to introduce different chemicals to these tanks, it would have had to clean the tanks prior to their use to eliminate any product contamination. Only tanks that contained gasoline (tanks 398, 399, 400, 401 and 402) were cleaned by PQS so that, if needed, ERT would have been able to demolish and dispose of the tanks, lines and piping without additional cleaning.42 At the time the sale to ERT was completed, permits, approvals and authorizations from federal, state and local governments relating to the property and equipment were required as shown in Table 2. An ERT site plot plan from 2010 (Figure 3) displays the facility layout that remained largely unchanged after Freedom took ownership.

40 Tank 395 was mislabeled as Glycerin at the time of the incident. 41 The site drainage will be discussed in detail in Section 3.3 of this report. 42 Pennzoil-Quaker State Company. Real Estate Purchase Agreement. PQS: Texas. October 2001.

Freedom Industries, Inc. Investigation Report May 2017

15

Table 2. PQS and ERT Environmental Permits and Reports43 West Virginia Department of Environment Division of Environmental Protection Office of Air Quality Certificate to Operate ID #039 00035 Yearly Inspection

Internal Floating Roof Seals (5-Year Inspection for PQS Only) West Virginia Department of Environment Division of Environmental Protection Office of Water Resources Generator of Hazardous Waste ID #WVD055573745 (PQS Only) #WVR000502559 (ERT/Freedom Only)

Groundwater Protection Fee WVNPDES Permit ID #WV0111457 (Yearly Inspection for PQS and ERT) West Virginia Emergency Response Commission Annual Tier II Filing Fee United States Coast Guard Operations Manual (Subject to Yearly Review) Oil Pollution Act Facility Response Plan (Yearly Review by United States Coast Guard) Spill Prevention, Control, and Countermeasure Spill Prevention, Control, and Countermeasure Plan (Subject to 5-Year Review) Superfund Amendments and Reauthorization Act (SARA) Title 312 Local Emergency Response Commission

Annual Filing SARA Title 313 Annual Filing

43 This is a complete list from the 2001 purchase agreement that identifies permits that were required for PQS’s prior use of the property.

Freedom Industries, Inc. Investigation Report May 2017

16

Legend: Etowah River Terminal Site Plot Plan 396

Aboveground Storage Tank 396 Containing Crude MCHM and PPH, Stripped Mixture

Drain

Industrial Sewer System Drain

Sump

Stormwater Culvert

Stormwater Sewer System

Figure 3. 2010 Etowah River Terminal site plot plan. (Source: Etowah River Terminal [adapted])

Freedom Industries, Inc. Investigation Report May 2017

17

  1. 2.2 Chemical Storage
  2. 2.2.1 Tanks Containing Crude MCHM and PPH, Stripped

Thirteen ASTs were located on the Freedom site at the time of the incident. These tanks included three 46,200-gallon ASTs (395, 396 and 397) containing a mixture of Crude MCHM and PPH, stripped (Figure 4).44 Before 2009, the tanks were used to store either glycerin or calcium chloride. According to Freedom, tank 396 held 88.5% Crude MCHM, 7.3% PPH, stripped and 4.2% water by weight on the day of the incident.45

Figure 4. MCHM- and PPH, stripped-containing tanks at Freedom post-incident. (Source: CSB) Tanks 395, 396 and 397 were 20 feet in diameter by 20 feet tall. The tanks had a lap-riveted46 shell, cone roof and a 0.25-inch lap-welded47 bottom. Tank 397 was a blend tank that was used to mix Crude MCHM and PPH, stripped to produce ShurFlot 944.48 The final product was stored in tanks 396 and 397 as well as in totes for sale (Figure 5).

44 Crude MCHM is used in the froth flotation process of coal washing and preparation. 45 Freedom Industries, Inc. Letter to West Virginia DEP describing the composition of the materials in Tank 396. January 22, 2014. Charleston, West Virginia. http://www.dep.wv.gov/pio/Documents/Freedom%20Response%20to%20WVDEP%20Order.pdf (January 31, 2017). 46 Lap riveting is riveting in which the ends or edges of plates overlap and are riveted together. 47 A lap joint is formed by overlapping two plates and welding them together. 48 ShurFlot 944 is a Freedom Industries product used for flotation in the mining industry.

Freedom Industries, Inc. Investigation Report May 2017

18

Figure 5. A ShurFlot 944 tote located at the Freedom facility. (Source: WVDEP)

  1. 2.2.1.1 ShurFlot 944

ShurFlot 944 was Freedom’s propriety blend of mostly Crude MCHM and PPH, stripped, and was the product that leaked into the Elk River.49 According to Freedom’s SDS, ShurFlot 944 is composed of a blend of alcohols, glycol ethers and carboxylates. The product, used for flotation, is a clear dark yellow or brown liquid with a strong odor. Freedom’s SDS for ShurFlot 944 is similar to the Crude MCHM SDS and states that it can cause skin, eye and respiratory irritation and is harmful if swallowed, possibly resulting in nausea and vomiting. 2.2.2.1.2 Crude MCHM Crude MCHM is manufactured by the Eastman Chemical Company (Eastman).50 Eastman’s SDS for Crude MCHM states that it contains a mixture of six different chemical compounds, including 4-MCHM

49 Although Shurflot 944 is the product name for the material that leaked from tank 396, this report refers to the leaked material as a mixture containing Crude MCHM and PPH, stripped. 50 Eastman, headquartered in Kingsport, Tennessee, manufactures specialty chemicals and products including additives, adhesives, fibers and specialty fluids for industry, transportation, construction, agriculture and other markets. Eastman commercialized MCHM for coal purification in 1996. In 1997, Eastman voluntarily conducted toxicology studies of Crude MCHM. As of the publication date of this report, Eastman is the only United States producer of Crude MCHM.

Freedom Industries, Inc. Investigation Report May 2017

19

and water (see Table 3).51 4-MCHM (CH3C6H10CH2OH), made up the highest percentage of the Crude MCHM and was the main chemical that entered the drinking water supply.52

Crude MCHM is used in the froth flotation process to remove impurities from coal (such as shale and clay).53 It acts as a foaming agent to bind to organic matter. The patent for Crude MCHM claimed prior agents used for this purpose, such as 2-ethyl hexanol, were believed to cause birth defects, and Crude MCHM is a less hazardous alternative to conventional frothing products.54 The substance has a characteristic licorice smell later determined to be detectable at concentrations as low as one part per trillion (ppt) post-incident.55

According to the Eastman Crude MCHM SDS, people should avoid contact with undiluted Crude MCHM during handling, as it can cause eye and skin irritation. At elevated temperatures, Crude MCHM vapors can also cause eye and respiratory tract irritation. Crude MCHM is also listed as harmful if swallowed (Figure 6). No occupational exposure detection methods or limits exist for Crude MCHM. The Eastman SDS lists exposure limit information only for methanol, which the SDS reported to be 1% of the mixture.

51 Crude MCHM is a colorless liquid at room temperature. According to the Eastman SDS, Crude MCHM freezes at 32°F (0°C) and boils at 356°F (180°C). It has a flash point of 235°F (112.8°C) and is water soluble with a density less than water. Crude MCHM has a Hazardous Material Identification System health rating of 2 of 4, flammability rating of 1 of 4 and a chemical reactivity rating of 0. 52 Crude MCHM is comprised of several chemically similar substances in which 4-MCHM is present at the highest concentration. 53 Nalco Chemical Company. Process for coal flotation using 4-methylcychohexanemethanol frothers. https://www.google.com/patents/US4915825?dq=methylcyclohexanemethanol+froth&hl=en&sa=X&ved=0ahUK Ewid3O-Kor7NAhXGNiYKHXQ3D6EQ6AEIIDAA (February 1, 2017). 54 Nalco Chemical Company. Process for coal flotation using 4-methylcychohexanemethanol frothers. https://www.google.com/patents/US4915825?dq=methylcyclohexanemethanol+froth&hl=en&sa=X&ved=0ahUK Ewid3O-Kor7NAhXGNiYKHXQ3D6EQ6AEIIDAA (July 8, 2016); C&EN Washington, Obscure Chemical Taints Water Supply. http://cen.acs.org/content/dam/cen/92/7/09207-cover.pdf (July 8, 2016). 55 One part per trillion is analogous to one drop of detergent in enough water to fill a string of railroad cars 10 miles long. Table 3. Crude MCHM Compounds and Percent Concentration from Eastman SDS (Revised August 18, 2011). Chemical Name Range of Concentrations 4-methylcyclohexanemethanol 68-89% 4-(methoxymethyl)cyclohexanemethanol 4-22% Water 4-10% methyl 4-methylcyclohexanecarboxylate 4-10% dimethyl 1,4-cyclohexanedicarboxylate 5% Methanol 1% 1,4-cyclohexanedimethanol 1-2%

Freedom Industries, Inc. Investigation Report May 2017

20

Figure 6. Crude MCHM Safety Data Sheet excerpt. (Source: Eastman Chemical 2011) 2.2.2.1.3 Polyglycol Ethers (PPH, stripped) Twelve days after the tank released its contents and the spill became known, Freedom disclosed that an additional product, PPH, stripped, was also present in tank 396 at the time of the leak. PPH, stripped,56 also used as an extender, made up 7.3% of tank 396’s contents. PPH, stripped is a mixture of propylene glycol phenyl ether and di-propylene glycol phenyl ether. “Stripped” likely refers to the distillation process that removes sodium hydroxide and other impurities from di-propylene glycol phenyl ether manufactured by The Dow Chemical Company (Dow)..

The Freedom SDS for PPH, stripped states that the chemical composition is made up of 100% polyglycol ethers and the exact chemical identities are proprietary due to trade secret protections.57 Also according to the SDS, PPH, stripped causes skin and serious eye irritation and handlers are instructed to avoid inhaling PPH, stripped vapors. It is also a combustible liquid.

The chemical constituents of PPH, stripped, Dow’s propylene glycol phenol ether and di-propylene glycol phenyl ether, pose similar potential health effects. According to the Dow SDSs, both chemicals can cause eye and skin irritation and have low toxicity from skin absorption or ingestion.58 These chemicals have been found to cause birth defects in lab animals only at levels toxic to the mother.59 2.2.3 Post-Incident Freedom Developments On January 10, 2014, WVDEP issued a Consent Order to Freedom to begin removing all material from all ASTs and store the material in an offsite area that provided adequate secondary containment. In addition, the order required Freedom to immediately take all necessary measures to contain, recover and remediate the material that escaped the breached AST and secondary containment dikes, including installation of interceptor trenches adjacent to the Elk River and installation and maintenance of booms60 and absorbents in affected waterways. The order also required Freedom to immediately conduct an

56 Unless stated otherwise, the term “PPH” in this report will refer to the Freedom PPH, stripped product that was also present in tank 396. 57 Freedom Industries. PPH, Stripped SDS. http://www.dhsem.wv.gov/Documents/PPH%20Stripped%20MSDS.pdf (July 8, 2016). 58 Dow. Propylene Glycol Phenol Ether SDS. http://www.dow.com/webapps/msds/ShowPDF.aspx?id=090003e8806933b4 (July 8, 2016). 59 Dow. Di-propylene Glycol Phenyl Ether SDS. http://www.dow.com/webapps/msds/ShowPDF.aspx?id=090003e8806933b4 (July 8, 2016). 60 A boom is a temporary floating barrier used to contain leaks on a body of water.

Freedom Industries, Inc. Investigation Report May 2017

21

integrity test of all ASTs and secondary containment structures for the entire facility.61 In addition, Freedom was required to submit to WVDEP a corrective action plan that would include the following:

  1. An outline of all actions to be taken to immediately remove and appropriately store materials

from the site.

  1. A detailed plan to appropriately implement a remediation of all contaminated soil and/or

groundwater.

  1. An outline of how all contaminated material and/or unusable product will be properly disposed.
  2. A plan and schedule for the ultimate disposition of the products stored in these tanks, including

T-396 tank contents that were being stored at the Poca Blending facility.62 By January 11, 2014, Freedom had removed all of the tank contents from the ASTs and transported it offsite to Poca Blending, LLC in four large banker tanks.63 On January 17, 2014, Freedom filed for bankruptcy with the U.S. Bankruptcy Court Southern District of West Virginia. On January 24, 2014, WVDEP issued a consent order to Freedom to dismantle and manage removal of all ASTs, associated piping, machinery and equipment associated with the bulk storage operations at ERT. A tank decommissioning plan dated March 7, 2014, and a companion remediation plan dated March 17, 2014, were prepared, which WVDEP approved. Tanks 393 through 402 were demolished, while tanks 403 through 405 were used for water runoff monitoring and storage compliance with the WVDEP Consent Order. The onsite buildings, including the office, garage and storage facility, were not demolished. The retaining walls and retention areas remained intact so that no contamination of areas from tank 396 occurred during the demolition.64 Today, the Freedom site no longer has any tanks on the facility and only the office/warehouse, garage and storage buildings remain (Figure 7). Freedom entered into the Voluntary Remediation Program in late February 2015, and the land has undergone extensive remediation since then (Figure 8). See Appendix B for a summary of fines and charges to Freedom officials.

61 West Virginia Department of Environmental Protection. Consent Order Issued under the Water Pollution Control Act West Virginia Code, Chapter 22, Article 11 and the Groundwater Protection Act West Virginia Code, Chapter 22, Article 12: Order No. 8207; WVDEP, Charleston, WV. November 12, 2014. 62 West Virginia Department of Environmental Protection. Order Issued under the Water Pollution Control Act West Virginia Code, Chapter 22, Article 11 and the Groundwater Protection Act West Virginia Code, Chapter 22, Article 12; WVDEP Charleston, WV. January 10, 2014. 63 West Virginia Department of Environmental Protection. Order Issued under the Water Pollution Control Act West Virginia Code, Chapter 22, Article 11 and the Groundwater Protection Act West Virginia Code, Chapter 22, Article 12; WVDEP Charleston, WV. January 10, 2014. 64 United States Bankruptcy Court Southern District of West Virginia. Case No. 2:14-bk-20017 [2014 Bankr. S.D.W.Va. (No. 2:14-bk-20017)].

Freedom Industries, Inc. Investigation Report May 2017

22

Figure 7. Demolition of the tanks at Freedom. (Source: Charleston Gazette)

Figure 8. Freedom site post-demolition. (Source: Google)

Freedom Industries, Inc. Investigation Report May 2017

23

  1. 2.4 Proximity to Water Treatment Intake and Transmission Main

The Freedom facility is located approximately 1.5 miles upstream from the raw water intake of the WVAW65 Kanawha Valley Treatment Plant (Figure 9).

Figure 9. Location of the WVAW water intake along the Elk River. (Source: WVAG) When WVAW KVTP was being designed, company officials initially proposed, to the Public Service Commission (PSC), to consolidate three existing water systems and to use two intakes—an existing one on the Elk River upstream from Freedom and a new one on the Kanawha River. The intake on the Kanawha River at Chelyan was denied by the West Virginia Department of Health66 in a permit issued on March 27, 1969, because Kanawha River water was not suitable for drinking. On August 15, 1969, after submitting revised plans, WVAW was approved by the Department of Health for a new single river intake on the Elk River at the new treatment plant site.

WVAW’s service area comprises 12 counties, nine of which were directly affected by this incident. CSB estimated the distance from the release at Freedom to the WVAW KVTP water intake was about 1.5 miles downstream in the Elk River (Figure 10).

65 WVAW is discussed in further detail in Section 4.6 of this report. 66 West Virginia Department of Health is currently known as West Virginia Department Bureau of Public Health.

West Virginia American Water Kanawha Valley Treatment Plant

Freedom Industries, Inc. Investigation Report May 2017

24

Figure 10. Approximate distance from the release at Freedom to the WVAW KVTP intake. (Source: Google Earth) The single water intake on the Elk River provided the medium through which the tank contents were distributed throughout the Kanawha Valley water system, affecting thousands of consumers who relied on access to quality water. The contamination of the water distribution system affected public health and led many to distrust the water quality immediately following the incident. WVAW and KVTP played a key role in how the chemicals spread through the water distribution system and how the contamination was remediated immediately after the incident and in the weeks that followed. It is important to understand the background and operations of the water utility company and the water treatment plant in order to recognize their level of involvement in this incident. The rest of Section 2 of this report provides a brief background on these entities, while a more detailed assessment of the plans, policies and procedures they followed is discussed in Section 4.6.

Freedom Industries Elk River Approximate Distance = 1.5 Miles West Virginia American Water Water Intake West Virginia American Water Kanawha Valley Treatment Plant I-77

Freedom Industries, Inc. Investigation Report May 2017

25

  1. 3 West Virginia American Water

WVAW is a subsidiary of American Water67 that provides water service to approximately 550,000 people in 288 communities in West Virginia. WVAW also serves many industrial clients locally including Toyota, Dow Chemical and Bayer CropScience.68 Currently, WVAW has four operating regions that include 17 facilities, nine of which are water treatment plants. WVAW’s service area (Figure 11) comprises portions of 12 counties, nine of which were directly affected by this incident.

Figure 11. Major service areas in West Virginia. (Source: WVAW)

The West Virginia PSC sets rules that WVAW is required to follow. These regulations are intended to ensure the public is receiving high-quality water at a fair price. All service rate increases are directly related to the cost of providing high-quality service and are subject to a public review process and approval by the West Virginia PSC.69 WVAW follows regulations created by the Environmental Protection Agency (EPA) and enforced by WVBPH that are intended to help provide high-quality drinking water. WVAW conducts more than 45,000 tests per year for about 100 potential contaminants, checking drinking water quality at every stage of the water treatment and delivery process.70

  1. 3.1 Kanawha Valley Treatment Plant

WVAW KVTP is a conventional coagulation and filtration water treatment facility that serves the Kanawha Valley System—a surface water system. At the time of the incident, KVTP was supplying water to approximately 93,660 service connections. The maximum treatment for the Kanawha Valley District is 50 million gallons per day (MGD). In 2010, the plant treated on average 32 MGD of water at a rate of approximately 22,000 gallons per minute while operating 24 hours per day. Later in 2014, the

67 American Water is discussed in Section 4.6. 68 American Water. http://www.amwater.com/wvaw/About-Us/ (July 13, 2015). 69 Ibid. 70 West Virginia American Water. The Care of Water. West Virginia American Water: West Virginia. 2016. http://www.amwater.com/files/AMER0525_WV_WEBbrochure.pdf (July 22, 2016).

Freedom Industries, Inc. Investigation Report May 2017

26

plant treated on average 29 MGD. The plant supplies water through a distribution system of approximately 2,400 miles of pipeline to a total population of 195,000.71 Finished water storage capacity in the system is calculated to be approximately 38 million gallons in 104 tanks.

Public surface drinking water sources are treated through various steps that include coagulation and flocculation,72 sedimentation,73 filtration74 and chemical disinfection.75 The KVTP facility receives water from the Elk River and treats it through chemical and filtration processes. Raw water enters the water treatment plant from a conventional side-channel intake. A floating boom and three bar racks, approximately 15 feet high, prevent floating material and large debris from entering the system, while parallel traveling screens catch smaller, suspended debris. Upon intake, potassium permanganate (KMnO4) and polyaluminum chloride, a flocculant, are added to the river water to oxidize chemical contaminants such as iron, manganese, arsenic or other organic chemicals and remove suspended solids.76 Then sodium hydroxide, a caustic soda, can be added to remove organic contaminants when needed.

The PAC77 (PAC; Watercarb 800) may be used to augment the treatment process and is physically removed in the upflow clarifiers at the plant. In these clarifiers the PAC becomes part of the sludge blanket through which the water flows in the clarifiers and thus increases the contact time with the PAC. In addition, the 16 granular activated carbon (GAC; Calgon 8x30) filters remove organic contaminants and control for taste and odor.78 A coagulant,79 polyaluminum chloride, and a polymer called Superfloc are used to remove turbidity via mixing during the coagulation and flocculation process in four sludge blanket clarifiers where solids are removed.

71 The 195,000 population served is based on multiplying customer accounts by census data regarding household size. 72 Coagulation and flocculation are the first steps in water treatment. Chemicals with a positive charge are added to the water. The positive charge of these chemicals neutralizes the negative charge of dirt and other dissolved particles in the water. When this occurs, the particles bind with the chemicals and form larger particles, called floc. Center for Disease Control. Community Water Treatment. http://www.cdc.gov/healthywater/drinking/public/water_treatment.html (March 28, 2016). 73 During sedimentation, floc settles to the bottom of the water supply, due to its weight. This settling process is called sedimentation. http://www.cdc.gov/healthywater/drinking/public/water_treatment.html (March 28, 2016). 74 Once the floc has settled to the bottom of the water supply, the clear water on top will pass through filters of varying compositions (sand, gravel and charcoal) and pore sizes, in order to remove dissolved particles, such as dust, parasites, bacteria, viruses and chemicals. http://www.cdc.gov/healthywater/drinking/public/water_treatment.html (March 28, 2016). 75 After the water has been filtered, a disinfectant (for example, chlorine or chloramine) may be added to kill any remaining parasites, bacteria and viruses, and to protect the water from germs when it is piped to homes and businesses. http://www.cdc.gov/healthywater/drinking/public/water_treatment.html (March 28, 2016). 76 Lesson 2 Appendix of Common Chemicals Used in Public Water System Treatment. http://www.wvdhhr.org/wateroperators/wv_advanced_course/resources/l2u1/l2appendix.pdf (March 28, 2016). 77 Powdered activated carbon is an organic material often made of wood, lignite, and/or coal which absorbs natural organic compounds, synthetic chemicals and controls taste and odors. 78 McGuire, M. J. Oxidation Studies with Crude 4-methylcyclohexanemethanol in Water. Technical Memorandum. Michael J. McGuire Inc. West Virginia Testing Assessment Project: West Virginia. May 2014. 79 Coagulants cause the suspended matter in water to clump together, due to either a physical texture of the chemical or the electrical charges of the coagulant and the colloidal particles. http://www.wvdhhr.org/wateroperators/wv_advanced_course/resources/l2u1/l2appendix.pdf (March 28, 2016).

Freedom Industries, Inc. Investigation Report May 2017

27

Prior to moving to the GAC filters, chlorine can be added when conditions dictate for pre-filtration disinfection.80 More sodium hydroxide is added to adjust the pH; zinc ortho-phosphate is added as corrosion control to create a protective layer inside pipes in the water distribution system, and to prevent leaching of lead from service pipes; and fluoride is added at 0.7 ppm to prevent dental cavities.81 Finally, this water moves to the clearwell,82 where the chlorine is given retention time to disinfect the water and then it is distributed into the system. See Figure 12.

Figure 12. A simplified process diagram of a water treatment plant. (Source: CSB)

Every two hours, KVTP operators sample and test water at various points of the treatment process (i.e., raw, before clarification, after clarification/before filtering, after filtering, finished water) for turbidity, pH and chlorine. Once during each 12-hour shift, operators test plant water for iron, manganese, chloride, fluoride, phosphate, hardness, alkalinity, taste and odor and take samples from the finished water to test for bacteria. Daily, during the morning shift, operators check zinc and aluminum levels in the finished water. Weekly, WVAW records a fluoride measurement taken from the raw water. Operators calibrate pH and fluoride meters in the plant at least once a day. During each shift, employees conduct a full plant walk-through, observing the basement, chemical feed rooms, chlorine room, high and low service pumps, traveling screens and other equipment. Every night, employees monitor flow meter readings from the sludge building, gas meter, intake, power building and substation. Every four hours, employees monitor and record tank levels in the Kanawha Valley and Bluestone distribution systems, checking trends and

80 Chlorine is added twice to the treatment process, once before the GAC filters and the second time at the filters. McGuire, M. J. Oxidation Studies with Crude 4-methylcyclohexanemethanol in Water. Technical Memorandum. Michael J. McGuire Inc. West Virginia Testing Assessment Project: West Virginia. May 2014. 81 CDC. Fluoridation of Drinking Water and Corrosion of Pipes in Distribution Systems Fact Sheet. https://www.cdc.gov/fluoridation/factsheets/engineering/corrosion.htm (February 3, 2017). 82 A clearwell is a contact tank that provides chlorine disinfection to treated water prior to being pumped to the water distribution system.

Freedom Industries, Inc. Investigation Report May 2017

28

monitoring and recording chlorine levels at booster stations. KVTP does not test for specific chemicals unless the results of the previously discussed water tests are abnormal or there are changes in water quality parameters. A more detailed assessment of the plans, policies and procedures regarding monitoring and testing is discussed in Section 4.6.3. 3.0 TECHNICAL ANALYSIS

Following the incident, CSB examined the tanks, containment wall and surrounding terrain to determine the cause of the spill and to understand the failure that allowed the contents of the tank to leak and travel into the Elk River. CSB also requested and reviewed available documentation of specifications and prior inspections of the tanks at the site. The technical analysis found that:

  1. Approximately 11,000 gallons of a chemical mixture containing Crude MCHM and PPH,

stripped, leaked from tank 396 through two holes (approximately 0.75 and 0.4 inches in diameter) on the tank floor. The holes were caused by pitting corrosion that degraded the thickness of the floor from the tank interior. Although the soil side of the tank bottom was corroded as most tank bottoms are, the amount of soil side corrosion was insignificant compared to the pitting corrosion that directly led to the incident.

  1. Once the chemical mixture escaped tank 396 through the holes on the bottom, it traveled along

the ground surface, moved through the soil and gravel pad beneath the tank, and extended toward two pathways to the Elk River: (1) through the failing secondary containment wall, and (2) through the deteriorated underground culvert.

  1. CSB found no documentation of prior maintenance or inspections by Freedom or ERT that would

have identified and addressed the internal corrosion in tank 396.

  1. Freedom and ERT did not validate the integrity of the secondary containment system, nor did

they maintain the secondary containment wall that surrounded the tanks despite knowing the wall was in poor condition; as a result, cracks and holes in the wall allowed the leak to escape the containment and travel into the Elk River.

  1. Freedom did not have any leak prevention or leak detection system in place to immediately

provide notification of tank leaks.

  1. Extremely cold weather conditions in early January 2014 may have caused a frost heaving effect

in the ground surrounding the Freedom tanks. Movement of the tank bottom or soil beneath the tank may have contributed to the onset of the spill. 3.1 Leak Quantity and Chemical Composition When CSB investigators arrived onsite on January 13, the contents of tanks 395 and 397, and the remaining contents of tank 396, had already been removed via vacuum truck and relocated to Baker storage containers at Freedom’s Poca Blending facility. To estimate the quantity of spilled material, CSB investigators reviewed Freedom’s tank inventory documentation and subtracted the volume of the recovered chemicals from tank 396 at Poca Blending from the last known volume of tank 396 prior to the incident. Tank 396 had an inventory of about 30,906 gallons on January 8, 2014. CSB investigators measured the Baker storage container’s level on January 16, 2014, and estimated a volume of about 20,000 gallons of recovered material from tank 396, resulting in an estimated net loss of about 11,000 gallons (Table 4).

Freedom Industries, Inc. Investigation Report May 2017

29

Table 4. Total Estimated Volume of Material Released. Chemical Estimated Volume Released (gallons)83 4-Methylcyclohexanemethanol 8,900 Methanol 160 Cyclohexanemethanol 17 Propylene glycol phenyl 91 Unknowns 1,800 Total Estimated Volume 10,967

In interviews with CSB investigators, Freedom personnel stated that Crude MCHM and PPH, Stripped were the only materials contained within tank 396 at the time of the incident. Beyond interviews, CSB partnered with the OSHA Charleston area office to collect a sample of material from the storage tank that leaked for further chemical analysis.

The tank 396 sample obtained by OSHA for chemical analysis was taken from the storage container at the Poca Blending facility on January 17, 2014. CSB found through interviews that the vacuum trucks used to remove the contents of tank 396 were not cleaned prior to their use during the leak response and remediation efforts. Further, CSB could not verify that the storage tanks at Poca Blending were clean prior to receiving the material from tank 396. Ultimately, it is possible that the sample of tank 396 contents may have been contaminated by remnant chemicals in either the vacuum trucks and/or the Poca Blending facility storage tanks.

The sample of tank 396 material was sent to OSHA’s Salt Lake City Test Center where the chemical composition was analyzed on January 27, 2014, using GC-MS, followed by a quantitative gas chromatography (GC) analysis on February 24, 2014.84 A summary of the reported analytes and their percent concentrations is given in Table 5.

83 Calculated by multiplying 11,000 (estimated gallons released) by the percent compositions listed in Table 5. 84 In both instances, OSHA used standard internal protocols to conduct the tests, which included extracting bulk liquid samples with isopropyl alcohol.

Freedom Industries, Inc. Investigation Report May 2017

30

Table 5. Summary of Reported Qualitative and Quantitative Chemical Analyses of Tank 396 Contents.

Qualitative GC-MS Quantitative GC Reported analytes and their percentages Major analytes detected: • 4-methylcyclohexanemethanol • 2-methylcyclohexanemethanol (2- MCHM)85 Minor analytes detected: • Methanol • Cyclohexanemethanol • Propylene glycol phenyl ether (PPH and/or isomer) • Unknowns • 4-methylcyclohexanemethanol (81.1%) • Methanol (1.42%) • Cyclohexanemethanol (0.15%) • Propylene glycol phenyl ether (PPH and/or isomer) (0.83%) • Unknowns (16.5%)

The objective of OSHA’s analyses was limited to compliance purposes and, as a result, did not address the identification of the unknown chemicals in the sample tested. CSB did not pursue any additional testing and cannot report any findings beyond what OSHA provided. 3.2 Tank Failure Analysis 3.2.1 Tank Entry and Visual Inspection After the incident, tank inspectors certified by the American Petroleum Institute (API)86 conducted internal and external inspections of tanks 395, 396 and 397 to document the most recent condition of the tanks prior to dismantling, and to determine the exact route through which the contents leaked from the tank or tanks.87 The 20-foot-diameter tanks were most likely constructed in the late 1930s and the material properties were consistent with tanks of that vintage typically used to store petroleum

85 The indication of 2-MCHM was most likely the result of a misidentification of the peak by a mass spectral library that OSHA uses to aid in the identification of unknowns. For the qualitative tests, OSHA relied upon a mass spectral library to tentatively identify the components of the tank 396 sample. After the initial data collection, OSHA purchased an analytical standard of 4-MCHM that contained both cis- and trans-4-MCHM isomers to calibrate its GC data. Results from the analytical standard indicate that the mass spectral library had misidentified the 2-MCHM and in fact OSHA was observing cis- and trans-4-MCHM isomers in its own GC data. The percentage of 4-MCHM reported in Table 5 is a summation of both the cis- and trans-4-MCHM isomers observed by OSHA in the tank 396 sample. 86 The American Petroleum Institute is a trade association that develops standards and practices for the oil and gas industry and certifies qualified personnel to inspect ASTs in accordance with accepted industry practices. 87 A hydrocutting firm cut a large door sheet in the shell of each tank for safe entry by inspectors.

Freedom Industries, Inc. Investigation Report May 2017

31

products. 88,89 The cylindrical shell and cone roof were of an obsolete,90 single lap-riveted91 construction. 92 The tanks contained a 0.25-inch lap-welded bottom that API certified inspectors estimated to be a replacement for the original lap-riveted bottom.93,94

During a visual inspection of the bottom interior of tank 396, inspectors identified deep, isolated pits or crevices near the shell (side) of the tank in addition to two holes on the tank floor (Figure 13). 95 CSB determined that the two holes, approximately 0.75 inches and 0.4 inches in diameter, were the source of the leak (Figure 14).

88 Powers, Gary, API 653 Inspection Report Tank 395. Powers Engineering, Inc., http://www.csb.gov/assets/1/19/API653_Internal_Inspection_Freedom_Industries_Tank_395_rev_0.pdf (March 1, 2017); Powers, Gary, API 653 Inspection Report Tank 396. Powers Engineering, Inc., http://www.csb.gov/assets/1/19/API653_Internal_Inspection_Freedom_Industries_Tank_396.pdf (March 1, 2017); Powers, Gary, API 653 Inspection Report Tank 397. Powers Engineering, Inc., http://www.csb.gov/assets/1/19/API653_Internal_Inspection_Freedom_Industries_Tank_397_rev_0.pdf (March 1, 2017). 89 Chemical analysis indicated the tank floor was a low-carbon steel containing 0.25 weight percent (wt%) carbon and 0.41 wt% manganese, with other trace elements commonly found in carbon steels. The microstructure was consistent with hot-finished steel. 90 Welding began to replace the use of rivets as the preferred method of storage tank construction in the late 1930s. Lieb, John M. Recent Developments in API Storage Tank Standards to Improve Spill Prevention and Leak Detection/Prevention (EPA). https://archive.epa.gov/emergencies/content/fss/web/pdf/liebpaper.pdf (July 25, 2016). 91 Single lap-riveting refers to rolled steel plates attached together with rivets. 92 Powers, Gary, API 653 Inspection Report Tank 395. Powers Engineering, Inc., http://www.csb.gov/assets/1/19/API653_Internal_Inspection_Freedom_Industries_Tank_395_rev_0.pdf (March 1, 2017); Powers, Gary, API 653 Inspection Report Tank 396. Powers Engineering, Inc., http://www.csb.gov/assets/1/19/API653_Internal_Inspection_Freedom_Industries_Tank_396.pdf (March 1, 2017); Powers, Gary, API 653 Inspection Report Tank 397. Powers Engineering, Inc., http://www.csb.gov/assets/1/19/API653_Internal_Inspection_Freedom_Industries_Tank_397_rev_0.pdf (March 1, 2017). 93 Ibid. 94 A lap weld is a type of weld in which one metallic surface overlaps another. 95 Powers, Gary, API 653 Inspection Report Tank 396. Powers Engineering, Inc., http://www.csb.gov/assets/1/19/API653_Internal_Inspection_Freedom_Industries_Tank_396.pdf (March 1, 2017).

Freedom Industries, Inc. Investigation Report May 2017

32

Figure 13. The bottom of tank 396 with holes and pits identified. (Source: CSB)

Figure 14. The bottom and shell wall of tank 396 with holes and pits identified through floor thickness. (Source: Powers96) API certified inspectors also entered and examined the two adjacent tanks reported to contain a mixture of Crude MCHM and PPH, stripped—395 and 397—and found similar pitting conditions. Tank 397 contained a 0.2-cm-diameter hole in the bottom in addition to deep isolated pits originating from the interior surface of the tank floor.97 There is no evidence that tank 397 leaked in January 2014, and the

96 Powers, Gary, API 653 Inspection Report Tank 396. Powers Engineering, Inc., http://www.csb.gov/assets/1/19/API653_Internal_Inspection_Freedom_Industries_Tank_396.pdf (March 1, 2017). 97 Powers, Gary, API 653 Inspection Report Tank 397. Powers Engineering, Inc., http://www.csb.gov/assets/1/19/API653_Internal_Inspection_Freedom_Industries_Tank_397_rev_0.pdf (March 1, 2017).

Freedom Industries, Inc. Investigation Report May 2017

33

hole identified during the inspection may have been plugged with debris. Pitting as deep as 0.2 inches was identified in tank 397, penetrating through about 80% of the bottom thickness.98 When examining tank 395, inspectors did not identify any through-thickness holes in the bottom, but pitting as deep as 0.125 inches degraded nearly half the thickness of the bottom interior surface.99

In addition to the pitting and holes in the bottom, tank 396 had other visual abnormalities observed during the interior visual inspection, such as structural integrity issues and additional corrosion sites. Tank 396 had several damaged roof deck support rafters on the inside.100 The roof support column in the center of the tank was made of materials susceptible to corrosion damage and the column was not affixed to the bottom to avoid lateral movement.101 The tank had isolated areas of active corrosion on the roof with some internal seeps during rain.102 API certified inspectors noted that the external coating on the shell and roof of the tank was nearing the end of its useful life as indicated by peeling and evidence of corrosion.103 Although no obvious corrosion holes were found on the roof, loose rivets or lap joints likely allowed rain to enter the tank. 3.2.2 Pitting Corrosion CSB commissioned metallurgical testing of cut carbon steel coupons104 from tank 396 to determine if the holes in the bottom resulted from a failure mechanism that occurred over time, possibly due to corrosion, or if the failure was sudden, such as a puncture to the tank floor from the exterior.

An examination of the morphology, or structure, of the holes and pits on the tank 396 sample revealed that the holes were caused by pitting corrosion that originated from the internal bottom surface of the tank and propagated toward the soil side. 105

Corrosion is an electrochemical reaction between a metal alloy and its environment, and can lead to degradation of structures. It can attack materials uniformly, degrading metals at an even rate across the surface, known as general corrosion. However, pitting corrosion is confined to a point or small area that takes the form of cavities, some of which can perforate through the thickness of the metal. Pitting corrosion can be difficult to detect because it is highly localized and the rate at which the depth of the pit

98 Ibid. 99 Powers, Gary, API 653 Inspection Report Tank 395. Powers Engineering, Inc., http://www.csb.gov/assets/1/19/API653_Internal_Inspection_Freedom_Industries_Tank_395_rev_0.pdf (March 1, 2017) 100 Powers, Gary, API 653 Inspection Report Tank 396. Powers Engineering, Inc., http://www.csb.gov/assets/1/19/API653_Internal_Inspection_Freedom_Industries_Tank_396.pdf (March 1, 2017). 101 Ibid. 102 Ibid. 103 Ibid. 104 A coupon is a material specimen or sample used for test or analysis. 105 McFadden, Sam, Metallurgical Evaluation of Tank Coupon 396-F/S9/10 from Freedom Industries, Charleston, WV. Anamet, Inc. http://www.csb.gov/assets/1/19/CSB_Freedom_Industries_5005.0486A_Final_Redacted.pdf (March 1, 2017).

Freedom Industries, Inc. Investigation Report May 2017

34

increases is often greater than the width.106 Corrosion products, such as rust, can cover the pits, making them harder to find during an inspection.

One feature of pitting corrosion is that pits usually initiate on the upper surface of a horizontally placed metal and grow in the direction of gravity.107 The internal surface of the tank 396 floor had isolated pitting that degraded into its thickness (Figure 15). In comparison, the corrosion on the soil side of tank 396 was characteristic of uniform or general corrosion that would be expected on carbon steel of that age, with shallow pits and patches of iron oxides. The rate of pitting corrosion in a localized area is many times greater than the uniform rate of corrosion over an entire surface of a metal.108

Figure 15. Cross-section of tank floor showing thickness variations from corrosion. (Source: Anamet109) Metal resists corrosion by forming a passive film or oxidation layer on the surface of the material. The film is formed naturally over time as the metal is exposed to air. Examples include patina formed on copper or rust formed on iron.110 Mill scale is an oxide of iron formed during the hot-rolling of steel during manufacturing. Mill scale develops to a uniform thickness and can protect metal surfaces from additional corrosion in some areas. However, microscopic cracks or discontinuities in the mill scale can increase corrosion rates because the unprotected area of the metal is exposed. Pitting corrosion is often initiated by the breakdown of the passive film or oxide, such as mill scale on the metal surface. Damage

106 Schweitzer, P. A. Corrosion Engineering Handbook, 2nd ed. Taylor & Francis: Boca Raton, FL. 2007. http://app.knovel.com/hotlink/pdf/id:kt00C9XHJ1/corrosion-engineering/fundamentals-metallic (July 8, 2016). 107 Ibid. 108 Byars, H. G. Corrosion Control in Petroleum Production, 2nd ed. TPC Publication 5 NACE International. 1999. http://app.knovel.com/hotlink/pdf/id:kt0080E7H4/corrosion-control-in/concentration-cells (July 8, 2016). 109 McFadden, Sam, Metallurgical Evaluation of Tank Coupon 396-F/S9/10 from Freedom Industries, Charleston, WV. Anamet, Inc. http://www.csb.gov/assets/1/19/CSB_Freedom_Industries_5005.0486A_Final_Redacted.pdf (March 1, 2017). 110 Schweitzer, P. A. Corrosion Engineering Handbook, 2nd ed. Taylor & Francis: Boca Raton, FL. 2007. http://app.knovel.com/hotlink/pdf/id:kt00C9XHJ1/corrosion-engineering/fundamentals-metallic (July 8, 2016).

Freedom Industries, Inc. Investigation Report May 2017

35

mechanisms can include localized mechanical damage, or chemical damage such as acidity, oxygen concentrations and high concentrations of chlorides (as in seawater).111

Laboratory analysis by energy dispersive x-ray spectroscopy detected silicon, chlorides, iron and oxygen, consistent with aqueous corrosion.112,113 Aqueous corrosion is an electrochemical reaction of materials caused by a wet environment. The presence of water provides a conductive medium for the electrochemical reaction and consequent formation of corrosion products on a metal surface. Corrosion products can include ions in the water or precipitated salts, such as chlorides, and hydrogen gas.114 Tank 396 was a closed tank, however holes identified in the roof likely allowed rainwater to enter the tank.

Although the CSB found evidence that the prior owner, ERT, added hydrochloric acid to the contents of tank 397 in 2012, 115 CSB did not find evidence from documentation or interviews, of any such addition to tank 396. OSHA’s Salt Lake Technical Center lab determined a pH range of 4.5-5 (strongly acidic) for the tank 396 sample that was obtained from the Baker storage containers post incident116 (insert FN). If ERT officials added hydrochloric acid to the tank 396 or lowered the pH of the tank with some other chemical, this may have initiated the corrosion or accelerated the corrosion rate of the tank interior. CSB could not come to a definitive conclusion regarding when the holes in the bottom of the tank formed or if the presence of an acid contributed to the corrosion. 3.2.3 Corrosion Rate Analysis In order to establish a timeline for corrosion formation over the years, an analysis was conducted to obtain the corrosion pitting rate for tank 396. The results from the corrosion rate analysis were used to determine the rate at which the corrosion penetrated the bottom thickness from the tank interior. Analysis of the pit morphology indicated that the corrosion of the holes that penetrated the bottom of tank 396 was initiated from the top surface of the bottom plates (internal product-side corrosion) rather than the underside.

CSB retained a tank expert to conduct a corrosion rate analysis based on the observed pitting and the data available during the incident investigation. Although it was recognized that the corrosion rates were

111 Nace. Pitting Corrosion. https://www.nace.org/Pitting-Corrosion/ (July 8, 2016). 112 Additional detected elements included aluminum, calcium, titanium, sulfur and potassium. Chloride ions and oxidizing agents such as Cu+2 and Fe+3 salts, as well as hydroxides, chromates and silicates are often associated with pitting corrosion. 113 McFadden, Sam, Metallurgical Evaluation of Tank Coupon 396-F/S9/10 from Freedom Industries, Charleston, WV. Anamet, Inc. http://www.csb.gov/assets/1/19/CSB_Freedom_Industries_5005.0486A_Final_Redacted.pdf (March 1, 2017). 114 Chilingar, G. V.; Mourhatch, R. A.; Ghazi D. Fundamentals of Corrosion and Scaling—For Petroleum and Environmental Engineers. Gulf Publishing Company. 2008. http://app.knovel.com/hotlink/pdf/id:kt006AXOZ1/fundamentals-corrosion/introduction-corrosion-2 (July 8, 2016). 115 Etowah River Terminal Plant Manager, email message to Laboratory Manager, “8.08.12 Neutralization of Tank 397.” August 8, 2012. 116 To obtain this result, OSHA used a pH testing strip intended for aqueous solutions. As this sample is a non- aqueous mixture, the reported pH should be considered a relative value for comparison to other samples, rather than a direct correlation with an aqueous pH value. The pH value is not an indication that acid was added to the tank, and should not be interpreted as such.

Freedom Industries, Inc. Investigation Report May 2017

36

variable and unknown, the best reasonable assumption at the time of the study was that the corrosion rate was constant over the life of tank 396 at 12.3 mils per year (mpy)117 with the corrosion rate bounded between 10 and 15 mpy.

An evaluation of the tank bottom in comparison to the tank shell indicated that tank 396 had two tank bottoms during its service life: the original riveted tank bottom and then a 250-mil (0.25-inch-thick) (6.35-mm) welded steel bottom that was retrofitted into the tank sometime after the original riveted bottom was replaced. The original riveted bottom was likely used until it failed and then the tank was retrofitted with a new welded steel bottom in order to continue its liquid storage function. The replacement bottom of tank 396 was a welded construction using lap-welded bottom plates, which suggests the bottom was retrofitted sometime after 1945 (Figure 16).118

Figure 16. Retrofitted welded bottom of tank 396 (inside of tank). (Source: CSB)

Without original tank drawings or documentation, it was assumed that the original tank 396 bottom lasted 25 years from its construction in 1938, and estimated that its replacement took place sometime after 1963, while the site was under the ownership of the Elk Refining Company or PQS. Tank inspectors estimated, based on the post-incident condition of the tank floor, that the second bottom was at least 25 years old. At some point after the installation of the second bottom, polyvinyl acetate (PVA),119 discussed in Section 3.2.4, was also likely added to the bottom of the tank to patch existing holes or prevent future corrosion (see Figure 17).

117 The unit mpy (mils per year or thousandths of an inch per year) is a common designation for corrosion rate. 118 Tank welding did not commonly occur until about 1945, when the technology developed during World War II was deployed for industrial purposes. After World War II, the practice of riveting gave way to welded steel construction. 119 Best practices dictate that a permanent lap-welded patch could have been used when the tank bottom failed.

Freedom Industries, Inc. Investigation Report May 2017

37

Figure 17. Tank 396 timeline. Original bottom replacement date based on 25-year service life. (Source: CSB).

  1. 2.4 Polyvinyl Acetate Material

During the initial examinations prior to dismantling tank 396, inspectors noticed remnants of what could have been a flexible organic liner or patch, adhered to the interior surface of the tank floor, likely applied sometime before the leak occurred (Figure 18).120 Analytical testing determined that the chemical composition of the material was PVA.121

Figure 18. Remnants of coating on interior tank floor. (Source: Anamet122)

120 McFadden, Sam, Metallurgical Evaluation of Tank Coupon 396-F/S9/10 from Freedom Industries, Charleston, WV. Anamet, Inc. http://www.csb.gov/assets/1/19/CSB_Freedom_Industries_5005.0486A_Final_Redacted.pdf (March 1, 2017). 121 Ibid. 122 Ibid.

Freedom Industries, Inc. Investigation Report May 2017

38

CSB investigators were unable to find documentation of the PVA material applied to the bottom of tank 396, but it is possible that the material, intended to be a liner or patch, was applied during prior facility ownership when tank 396 stored hydrocarbons. While there was no evidence of welded repairs around the bottom of tank 396, investigators believe the PVA could have been applied for general corrosion prevention, or to patch a leak and return to service. Recommendations from prior inspections of the larger tank 398 called for the application of “an epoxy sealer to the bottom 6 inches of the shell and also apply sealer onto the chime” in 1997. Another possible source of the PVA remnants was reported to be a backflow of contents from the vacuum truck post-incident that occurred in the course of emptying the tanks. However, metallographic and microscopic examinations revealed corrosion product underneath the PVA, indicating that the PVA was applied to the bottom of the tank sometime before the incident (Figure 19).123

The PVA could have been applied to act as a soft patch or liner to prevent corrosion or leaks. Soft patches have been used for temporary roof repairs in the tank industry for years. Often, the patches are thick elastomeric polymers made from a variety of materials, including rubber, neoprene, glass cloth, asphalt, and mastic or epoxy sealing materials; the choice depends on the contents of the tank and the service conditions.124 According to API Recommended Practice 575, leaks in roofs can be repaired by soft patches that do not involve cutting, welding, riveting or bolting of the steel. Best practices discourage the use of patches in lieu of permanent repairs for tank roofs, but recommend them only for temporary operations since it is known that they could be delaminated from the surfaces with a fairly high probability in an unpredictable manner. Many factors affect how well patches adhere to the steel surfaces including surface preparation, the patch material, mixing and preparation, the compatibility of the material with the product and other factors.

Also used to control corrosion, liners can be applied as coatings and have been proven to effectively prevent internal corrosion in the bottom of steel tanks.125 For carbon steel tanks containing hydrocarbons, water and other ions can settle out of mixtures and cause various types of corrosion, including localized metal loss or pitting corrosion. PVA is a type of polyvinyl ester that is typically used to line tanks containing water, crude oil, aromatics and solvents.126

123 McFadden, Sam, Metallurgical Evaluation of Tank Coupon 396-F/S9/10 from Freedom Industries, Charleston, WV. Anamet, Inc. http://www.csb.gov/assets/1/19/CSB_Freedom_Industries_5005.0486A_Final_Redacted.pdf (March 1, 2017). 124 American Petroleum Institute. Recommended Practice 575, Inspection Practices for Atmospheric and Low- Pressure Storage Tanks, 3rd ed. API Publishing: Washington, DC. April 2014. 125 American Petroleum Institute. Recommended Practice 652, Lining of Aboveground Petroleum Storage Tank Bottoms, 4th ed. API Publishing Services: Washington, DC. 2014. 126 Ibid.

Freedom Industries, Inc. Investigation Report May 2017

39

Figure 19. Corrosion product beneath PVA. (Source: Anamet127) 3.2.5 Frost Heave Effect, Flow and Leak Scenario A frost heaving effect, caused by extremely low temperatures, may have contributed to the sudden release of the mixture containing Crude MCHM and PPH, stripped from the bottom of tank 396. The severe cold weather in early January 2014, referred to as a “polar vortex,”128 brought bitterly cold temperatures to the Midwest, South and much of the eastern and northeastern United States.129 The Charleston area set a new minimum temperature record of -3°F just two days before leak discovery.130

Frost heaving occurs when the freezing of water-saturated soil causes the deformation and upward thrust of the ground surface.131 When water freezes, it expands. This expansion is often referred to as frost

127 McFadden, Sam, Metallurgical Evaluation of Tank Coupon 396-F/S9/10 from Freedom Industries, Charleston, WV. Anamet, Inc. http://www.csb.gov/assets/1/19/CSB_Freedom_Industries_5005.0486A_Final_Redacted.pdf (March 1, 2017). 128 A polar vortex is a large pocket of very cold air, typically the coldest air in the Northern Hemisphere, which sits over the polar region during the winter season. http://www.accuweather.com/en/weather-news/what-is-a-polar- vortex/21793077 (September 21, 2016). 129 https://www.wunderground.com/news/polar-vortex-plunge-science-behind-arctic-cold-outbreaks-20140106 (September 21, 2016). 130 The average minimum temperature for the same date is 26°F. https://www.wunderground.com/history/airport/KCRW/2014/1/7/DailyHistory.html?req_city=Charleston&req_s tate=WV&req_statename=West+Virginia&reqdb.zip=25301&reqdb.magic=1&reqdb.wmo=99999 (September 21, 2016). 131 Rempel, A. W.; Wettlaufer, J. S.; Grae Worster, M. Premelting Dynamics in a Continuum Model of Frost Heave. J Fluid Mechanics. 2004, 498, 227-244. Corrosion product PVA material

Freedom Industries, Inc. Investigation Report May 2017

40

jacking or frost heaving.132 Freezing weather prevalent at that time of year caused the frost heaving133 of the soil underneath the tank, which possibly led to the flexure or movement of the tank bottom in the vicinity of the holes. The movement provided enough bending on the bottom plates to possibly dislodge the PVA material or other debris blocking flow through the bottom holes. Once the material became dislodged, the pressure from the filled tank 396 may have enabled the sudden gushing flow of liquid from the tank bottom. Approximately 11,000 gallons of the tank contents had leaked from tank 396 prior to leak discovery. Based on CSB calculations, the time for 11,000 gallons to drain from the tank, assuming leakage through the 0.4-inch hole, the 0.75-inch hole, or both holes, is approximated below:134

Leak size Time to drain 11,000 gallons 0.4-inch diameter ~28 hours 0.75-inch diameter ~8 hours Both 0.4 and 0.75-inch holes open ~6 hours

On the day of the incident, air quality complaints from the public began around 10:00 AM and the material was removed from tank 396 at around 1:00 PM. Considering that the smell of the 4-MCHM contaminated water was detectable by humans at concentrations in water as low as one part per trillion, it seems unlikely that the leak occurred through the 0.4-inch hole for a 28-hour period without public notice the prior day. Instead, a leak through either the 0.75-inch hole or both the 0.75- and 0.4-inch holes seems plausible because the leak could have started in the early morning hours, but was not noticed or reported by local residents until the morning of January 9.

Finally, the soil beneath the gravel base for the tank was clay, and as a result the lowest resistance flow path for a leak should have been through the gravel and then along the ground surface (Section 3.3). Interviews with Freedom officials and employees indicated that they never noticed such a leak prior to the incident. 3.2.6 Tank Integrity and Inspections Freedom and ERT did not have a program in place to ensure that the ASTs and associated equipment were properly maintained with regular inspection and testing programs. It is generally accepted as good practice to use recognized industry practices, such as API Standards for tanks storing petroleum, petrochemicals, organic liquids and liquid chemicals, to ensure the integrity of a tank. CSB requested and reviewed documentation from Freedom and ERT and found no evidence of a program in place to ensure that the ASTs and associated equipment were properly maintained with regular inspection and testing programs. This is partly because only a limited number of regulatory requirements governing ASTs would have compelled Freedom to have such programs, and the company did not voluntarily choose to do

132 Black, P. B.; Hardenberg, M. J. Historical Perspectives in Frost Heave Research. U.S. Army Corps of Engineers, Cold Regions Research and Engineering Laboratory, 1991. Special Rep. 91-23, pp. 3-7. 133 Frost heave requires freezing temperatures (temperature gradient) for a prolonged period of time. This was evident in the prolonged wintry weather of 2013 to 2014. 134 The following formula was used: t = 2At(√(z1) - √(z2))/[CdAo√(2g)], where At is the cross-sectional area of the tank, z1 is the height of the fluid in the tank at the start of the leak, z2 is the height of the fluid when flow from the tank is stopped, Cd is the coefficient of discharge (in this case assumed to be 0.62), Ao is the area of the leak orifice, and g is gravitational acceleration.

Freedom Industries, Inc. Investigation Report May 2017

41

so. Documentation provided to CSB after the incident bears little evidence of rigorous, formal tank inspections that would have identified potential leaks.

CSB was able to obtain some inspection documentation under the ownership of PQS and ERT, but there is no documentation of internal inspections of tanks 395, 396 and 397. Freedom indicated that the three tanks were not inspected at least ten years before the January 2014 incident. The larger tanks on the facility more recently received internal inspections under the ownership of ERT. Certified internal inspections of the larger tanks, conducted in 2008 to 2010, stated that the original tank bottoms were replaced between 1994 and 1999. Almost all of the 2008 internal inspection reports identified that the tanks were overdue for inspections and noted the damaged secondary containment. However, none of the prior inspection documentation focused on tanks 395, 396 and 397.

CSB investigators obtained a record of a two-page report of a previous informal review of the tanks at the Freedom site that was performed by a third-party consultant in October 2013, prior to the change of site ownership. The brief report included a visual inspection summary and stated that tanks 395, 396 and 397 were riveted but provided no information about their internal condition. The report also noted that “the tanks have been maintained to some structural adequacy, but not necessarily in full compliance with API- 653 or EPA standards” and also stated that the tanks were not suitable for petroleum or regulated products without costly upgrades. The 2013 report, dated just over two months before the incident, noted that the “condition of the other tank floors is questionable,” when referring to the tanks that had not undergone previous internal inspections. In the report, the inspector recommended developing a schedule to have each tank completely inspected by a certified tank inspector over the next 5 years. 3.2.6.1 Monitoring and Inspection Requirements for ASTs CSB found that Freedom did not have a detailed record of its tank history, maintenance and inspection records for tank 396. While the API Standard 653135 does have requirements for AST inspections, the tanks at Freedom were not required to comply with the standard under any state or federal law (see Section 5). Regular monitoring and maintenance of the tanks are necessary to ensure they operate effectively. Tank monitoring requirements may include visual examination of all tanks in operation, piping, valve, pump and other equipment surfaces for cracks, corrosion or releases on a weekly and monthly basis.136

Also, the secondary containment area around the tanks should be visually monitored daily, weekly and monthly.137 Daily, weekly or monthly monitoring includes walking around the facility to identify cracks in the containment areas and to determine if any maintenance deficiencies or equipment malfunctioning is occurring around the tanks, which could cause a release or leak. Records of all periodic inspection and

135 API 653, Tank Inspection, Repair, Alteration and Construction, is a recognized standard developed by API that covers the inspection, repair and modification of ASTs that store petroleum and chemicals. 136 Minnesota Pollution Control Agency. Monitoring Requirements for Aboveground Storage Tanks. April 2004. https://www.pca.state.mn.us/sites/default/files/t-a1-03.pdf. 137 Benton, Phillip, Storage Tank Inspection and Compliance. 2011. http://www.hdrinc.com/sites/all/files/content/white-papers/white-paper-images/4596-storage-tank-inspection- and-compliance_0.pdf.

Freedom Industries, Inc. Investigation Report May 2017

42

monitoring activities also must be kept by tank owners. The records for tank monitoring activity would include the name of the person doing the monitoring, monitoring method or methods used, date of the monitoring activity, results of the monitoring and type of leak detection method used.138 3.2.6.2 Leak Prevention and Detection CSB found that Freedom did not have any leak prevention139 or leak detection system140 (LDS) in place as recommended by best practices and industry guidelines, nor did it have an effective leak containment141 process. A leak monitoring system is a method that can be used by a tank inspector from outside the tank to detect leaks in the bottom of the tank, such as secondary catchment under the tank bottom with a leak detection sump, or a sensitive gauging system. Leak prevention systems may include cathodic protection to reduce the likelihood of corrosion142 (in accordance with API Recommended Practice 651143) and a thick film liner144 (in accordance with API Recommended Practice 652145). Although the PVA material could have originally been applied to prevent corrosion or leaks in the tank, it was evident upon visual inspections of the tank bottom post-incident that the PVA liner or patch was not inspected or maintained, nor was it scheduled and documented for future inspections.

Freedom did not have any level indication device, gauge system or measurement to capture the actual amount of the leak, which contributed to the changing estimates of the spill amount. There was no West Virginia state or federal requirement that would have made the installation of an LDS mandatory for ASTs. Although LDSs have been widely used in underground storage tanks, CSB found that LDSs are rarely used in non-hydrocarbon oil-based facilities with ASTs. The commonly adopted LDSs that have been developed in the oil industry range from simple visual inspection of floor sumps under the ASTs to automated, electronic data-gathering instruments to sophisticated consoles and computer systems. Most continuous monitoring systems incorporate automatic leak alarm capabilities while other methods of leak detection are conducted as part of a regularly scheduled maintenance program and rely on daily visual inspections for evidence of initial leak detection.

Other LDS technologies include the use of liquid sensing cables, which are placed either in the interstitial space of a double-walled tank or buried in the soil beneath the tank; soil vapor monitoring; or acoustic emissions tests. These systems can be programmed to monitor a tank continuously or they can be part of

138 Minnesota Pollution Control Agency. Monitoring Requirements for Aboveground Storage Tanks. April 2004. https://www.pca.state.mn.us/sites/default/files/t-a1-03.pdf. 139 Leak prevention is any process that is designed to deter a leak from occurring in the first place. 140 Leak detection is any process or system that is designed to find a leak after one has occurred. 141 Leak containment is any process or system that is designed to contain a leak and to isolate the contained liquid from contaminating groundwater or surface water. 142 Cathodic protection is a technique used to reduce corrosion of a metal surface by making the entire surface the cathode of an electrochemical cell. 143 American Petroleum Institute. Recommended Practice 651, Cathodic Protection of Aboveground Petroleum Storage Tanks, 4th ed. API Publishing: Washington, DC. September 2014. 144 A thick film liner is a system or device, such as a membrane, installed beneath a storage tank, in or on the tank dike, to contain any accidentally escaped product. 145 American Petroleum Institute. Recommended Practice 652, Lining of Aboveground Petroleum Storage Tank Bottoms, 4th ed. API Publishing Services: Washington, DC. 2014.

Freedom Industries, Inc. Investigation Report May 2017

43

the regularly scheduled tank testing and maintenance program.146 Despite the existence of these LDS technologies, CSB investigators found that most existing ASTs (10,000 gallons or greater) do not have LDSs; rather, the owners of the AST overly rely on visual inspections, which are not always effective in accurately detecting leaks at the initial stage. In addition, only a few new aboveground storage facilities across the nation have installed LDSs, especially in states (such as Alaska) with existing regulation for ASTs.147 3.2.7 American Petroleum Institute Standards on AST Leaks A review of the petroleum industry’s approach to the protection of the environment indicated that multifaceted and numerous standards have been developed to address environmental protection from potential escapes of both liquid and gaseous substances. However, these methods may not be adopted by owners of non-petroleum-based ASTs if not incorporated into existing regulatory programs. API has developed and published numerous standards that have guided the construction of ASTs since the mid- 1930s; however, API did not develop standards to address specific maintenance and inspection issues for existing ASTs until the late 1980s and 1990s.

One of the most notable standards that API developed for ASTs is API 653, “Tank Inspection, Repair, Alteration, and Reconstruction.” 148 API Standards 650149 and 653 are considered two of the primary industry standards by which most aboveground welded storage tanks are designed, constructed and maintained.150 Table 6 highlights various API Standards and other documents that address leak and spill prevention, detection or containment for aboveground tanks. Table 6. API Standards, Recommended Practices and Publications Addressing Spill and Leak Prevention, Detection or Containment for ASTs or AST Facilities. API Number Title Leak Prevention Leak Detection Leak Containment Standard 650 Welded Steel Tanks for Oil Storage Yes Yes Yes

146 Ibid. 147 Alaska Department of Environmental Conservation. Technical Review of Leak Detection Technologies Volume II Aboveground Bulk Fuel Storage Tanks. https://dec.alaska.gov/spar/ppr/docs/ldetect2.pdf. (March 1, 2017). 148 First published in 1991, the tank inspection, repair, alteration and reconstruction methods described in API 653 have been noted to have significantly improved the safety and reliability of existing tanks (when properly applied). Lieb, John M. Recent Developments in API Storage Tank Standards to Improve Spill Prevention and Leak Detection/Prevention (EPA). 2001. https://archive.epa.gov/emergencies/content/fss/web/pdf/liebpaper.pdf (July 25, 2016). 149 The first edition of API 650 was published in 1961, but its predecessor, API 12C, had been in use since 1936, when welding began to replace riveting as the preferred construction method. Both API 12C and API 650 address only newly constructed tanks. API 650 covers material, design, fabrication, erection and testing requirements for aboveground, vertical, cylindrical, closed and open-top, welded steel storage tanks in various sizes and capacities. This standard applies to tanks with internal pressures approximating atmospheric pressure, but ranging as high as 2.5 pounds per square inch. This standard applies to newly constructed tanks before they have been placed in service. 150 These standards address both newly constructed and existing ASTs used in the petroleum, petrochemical and chemical industries.

Freedom Industries, Inc. Investigation Report May 2017

44

Standard 653 Tank Inspection, Repair, Alteration, and Reconstruction Yes Yes Yes RP 651 Cathodic Protection of Aboveground Storage Tanks Yes No No RP 652 Lining of Aboveground Storage Tank Bottoms Yes No No RP 2350 Overfill Protection for Storage Tanks in Petroleum Facilities,1996 Yes No No Standard 2610 Design, Construction, Operation, Maintenance, and Inspection of Terminal & Tank Facilities Yes Yes Yes RP 575 Inspection of Atmospheric and Low-Pressure Storage Tanks Yes Yes No Publication 306 An Engineering Assessment of Volumetric Methods of Leak Detection in Aboveground Storage Tanks, 1991 No Yes No Publication 307 An Engineering Assessment of Acoustic Methods of Leak Detection in Aboveground Storage Tanks, 1991 No Yes No Publication 315 Assessment of Tank Field Dike Lining Materials and Methods, 1993 No No Yes Publication 322 An Engineering Assessment of Acoustic Methods of Leak Detection in Aboveground Storage Tanks, 1994 No Yes No Publication 323 An Engineering Assessment of Volumetric Methods of Leak Detection in Aboveground Storage Tanks, 1994 No Yes No Publication 325 An Evaluation of a Methodology for the Detection of Leaks in Aboveground Storage Tanks, 1994 No Yes No Publication 334 A Guide to Leak Detection for Aboveground Storage Tanks, 1995 No Yes No Publication 340 Liquid Release Prevention and Detection Measures for Aboveground Storage Facilities, 1997 Yes Yes Yes

Freedom Industries, Inc. Investigation Report May 2017

45

Publication 341 A Survey of Diked-Area Liner Uses at Aboveground Storage Tank Facilities No Yes Yes

  1. 3 Tank Leak to the Elk River

Once the mixture containing Crude MCHM and PPH, stripped escaped tank 396 through the holes on the bottom, it traveled along the ground surface, moved through the soil and gravel pad beneath the tank, and extended toward two pathways to the Elk River: (1) through the failing secondary containment wall, and (2) through the deteriorated underground culvert. 3.3.1 Site Geotechnical Analysis After tanks 395, 396 and 397 were dismantled and removed from the site, CSB commissioned a geotechnical analysis to examine the permeability151 and soil characteristics immediately below the tanks. The purpose of the analysis was to characterize the flow of the mixture containing Crude MCHM and PPH through the tank holes into the soil to understand how long the leak could have been present in the soil before detection. The analysis concluded that the 4- to 6-inch gravel pad directly beneath the tank was highly permeable, through which the tank contents quickly traveled at the onset of the release. PQS remediated the soil and gravel beneath some of the tanks in 2002, prior to the sale of the site to ERT. However, the remediation did not include the soil beneath tank 396. As a result, it is likely the soil beneath the tanks had remained unchanged since the late 1930s when the tanks were constructed. It is also possible that some gravel and soil was added during the replacement of the tank 396 bottom, estimated by CSB to have taken place sometime in the 1960s (see Section 3.2.3). The tank floor was placed directly on the gravel, with no release prevention barrier. Release prevention barriers can include external liners or concrete pads placed under a tank to prevent the escape of released material and channeling release material for leak detection.152

Soil samples near tank 396 were collected and tested in accordance with ASTM International.153 Analysis of the soil boring revealed the presence of a gravel base immediately under the tank. The examination of the soil characteristics revealed the prevalence of alluvial deposits of sand, gravel, silt and clay at the site (Figure 20).

151 Soil permeability is the property of the soil to transmit water and air. The size of the soil pores is of great importance with regard to the rate of infiltration (movement of water into the soil) and to the rate of percolation (movement of water through the soil). Pore size and the number of pores closely relate to soil texture and structure, and also influence soil permeability. ftp://ftp.fao.org/fi/CDrom/FAO_training/FAO_training/General/x6706e/x6706e09.htm (September 21, 2016). 152 American Petroleum Institute. Standard 653, Tank Inspection, Repair, Alteration and Reconstruction, 4th ed. API Publishing: Washington, DC. November 2014. 153 ASTM International (formerly the American Society for Testing and Materials) is a standards organization that develops, publishes and delivers voluntary international consensus technical standards. http://www.astm.org/ABOUT/overview.html (September 21, 2016).

Freedom Industries, Inc. Investigation Report May 2017

46

Figure 20. Gravel base under tank 396 and other tanks containing mixtures with Crude MCHM and PPH, Stripped. (Source: Terracon)

The porous gravel base, which separated the native surficial clay, was measured as approximately 4 inches thick under each tank. The soil beneath the gravel base was found to be clay-like. The minimum coefficient of permeability154 of the surficial clay was less than 10-7 cm/sec, which indicated moderate to slow permeability (see Figure 21).

Because gravel is highly permeable, it offers little resistance to flow (Figure 22). Therefore, any leak in tank 396 would have been observed at the perimeter or soaking the ground around the tank. However, none of the Freedom employees interviewed by CSB reported noticing the leak prior to the day of the incident.

154 Permeability is commonly measured in terms of the rate of water flow through the soil in a given period of time. It is usually expressed either as a permeability rate in centimeters per hour (cm/h), millimeters per hour (mm/h) or centimeters per day (cm/d), or as a coefficient of permeability (k) in meters per second (m/s) or in centimeters per second (cm/s). ftp://ftp.fao.org/fi/CDrom/FAO_training/FAO_training/General/x6706e/x6706e09.htm (September 21, 2016).

Freedom Industries, Inc. Investigation Report May 2017

47

Figure 21. Permeability coefficients for different types of soils. (Source: Food and Agriculture Association)

Figure 22. Low resistance flow path provided by gravel base. (Source: CSB)

Freedom Industries, Inc. Investigation Report May 2017

48

  1. 3.1.1 History of the Soil: Voluntary Remediation of Lead- and Hydrocarbon-

Contaminated Soil Years ago, under the ownership of PQS, soil samples taken near several storage tanks were analyzed. This analysis revealed concentrations of lead beyond the federal limit. This discovery led PQS to pursue a path toward remediating the site, which explains the presence of clay material and gravel on the site. After the sale of the PQS facility to ERT, the site was voluntarily remediated in 2002 to ensure there was no soil or groundwater contamination resulting from PQS’s ownership. In October 2004, approximately 33.5 tons of lead-impacted surface soil between tanks 400 and 399 and on the northeastern side of tank 399 were excavated and transported to a permitted facility. The excavation was restored by backfilling the area with low-permeability clay material that was smoothed and compacted. The compacted, low-permeability clay material was covered with gravel. The condition of the land remained as such with clay material covered with gravel when Freedom took ownership of the site. In February 2007, WVDEP issued a letter based on the review of the groundwater monitoring reporting for the ERT that stated “results demonstrate that the contaminants pose no threat to the nearest receptor, the Elk River.” 155 WVDEP supported discontinuing groundwater sampling at this site based on the stable and low levels of lead and declining levels of hydrocarbons. 3.3.2 Secondary Spill Containment In the absence of a release prevention barrier under the tank, the next barrier to prevent the tank contents from escaping into the environment was the secondary containment walls or dike156 walls that surrounded the tanks. All of the tanks onsite were surrounded on all sides by masonry brick walls, or dikes that were fabricated to function as secondary spill containment157 for any spills that might have occurred.158 Two separate dikes surrounded the tanks. The first dike contained tanks 398 through 405. It was also separated from the second dike by a concrete wall between tank 398 and the pump house. The second dike surrounded tanks 393 through 397. Figure 23 provides a visual delineation of both dikes.

The tanks holding mixtures of Crude MCHM and PPH, stripped were contained within the second dike, which was constructed of brick, concrete block and poured concrete and was designed to act as secondary containment in the event of a complete breach of the tanks. The tank contents continued to flow from the bottom of tank 396 to the low point of the northwest corner of the dike wall. The elevation of the tanks was above the Elk River, which allowed for the chemicals to ultimately flow under the failed and deteriorated unreinforced dike walls toward the river. It is possible the extreme freezing condition provided some resistance to the flow; however, when temperature increased on January 9, the material released in the ground thawed and the leak became unrestricted, with increased odor intensity.159 Once outside the containment area, the leak flowed for many hours, trickling down the short, steep escarpment into the Elk River and ultimately into the public water supply.

155 WVDEP. Letter to Shaw Environmental Service. Response to 2006 Groundwater Monitoring Report, February 15, 2007. 156 A dike is a barrier constructed to control or confine hazardous substances and prevent them from entering sewers, ditches, streams or other flowing waters. 157 Secondary spill containment is the containment of hazardous liquids in order to prevent soil and water pollution. 158 Secondary containment walls constructed of earthen berms, concrete or other materials are common structures in petroleum and chemical storage industry facilities for the purpose of containing a major release. 159 The average temperature (39°F) was above freezing (33°F) on January 9, 2014, the day the leak was detected.

Freedom Industries, Inc. Investigation Report May 2017

49

Figure 23. View from inside the dike wall facing the Elk River of the concrete block walls with no reinforcement (Left); dike wall along the tank farm parallel to the Elk River (Right). (Source: CSB) The dike walls were in poor condition, and in December 1991 Pennzoil decided to upgrade a portion of the dike wall that ran parallel to the Elk River around tanks 399 through 402 in an effort to minimize the potential for spills from the tank farm to reach the river. The construction plan called for a 260-linear-foot concrete wall to be installed just inside and abutting the existing brick wall, and the remaining brick containment wall was to be repointed.160 After the upgrade was completed, the Spill Prevention, Control, and Countermeasure (SPCC)161 plan for the facility should have been updated by facility personnel and recertified by a Registered Professional Engineer. The repairs identified in the construction plan were never performed.

A 2013 estimate to repair the degraded dike walls included digging a new footer 3 feet deep alongside the existing block walls, replacing or shoring approximately 1,000 feet of existing dike wall, and relocating the conduits and piping that were attached to the wall. The estimated cost was $225,000,162 and the need to upgrade the dike walls was clearly recognized by management; however, the walls were not repaired prior to the incident. The dike walls surrounding the tanks were not maintained; consequently, on the day of the incident, the content of the tank was able to flow through the deteriorated portions of those walls. As demonstrated in Figure 24 (left), many sections of the dike walls featured large holes and cracks that would not contain spills in the event of a complete breach of the tanks. This particular portion of the dike wall surrounded tank 398 and was located east of the tank, closer to Barlow Drive than the Elk River. Figure 24 (right) shows a hole between two dike walls that was located fairly close to the Elk River. The cement mortar between concrete blocks had deteriorated over time in several areas around the dikes. In

160 Repointing is the grinding or raking out of existing mortar between joints of a masonry unit and replacing with new mortar. 161 SPCC is discussed in further detail in Appendix E. SPCC plans incorporate specific steps for preventing, controlling and mitigating oil spills that are required for facilities that store oil and oil-containing products exceeding certain capacity thresholds where there is a possibility that an oil spill would reach a navigable water. 162 Witherup Fabrication and Erection, Inc. Budgetary Costs for Etowah Tank Farm Upgrades and Repairs. Witherup Fabrication and Erection, Inc.: Pennsylvania. December 2, 2013. Dike

Freedom Industries, Inc. Investigation Report May 2017

50

addition, although concrete caps were used around the top of the dike walls, many of these caps were missing or had deteriorated, which allowed for rainwater or other elements to infiltrate the walls.

Figure 24. The dike walls that surrounded the tank farms were in poor condition. (Source: CSB) 3.3.3 Culvert Freedom drained stormwater that collected in the tank farm by directing it to an oil/water separator before discharging it into the river. The diked areas had valves to permit the release of accumulated rainwater. These valves were closed at all times except during draining operations. The facility was also protected with surface drains that led to an oil/water separator. Treated stormwater from the oil/water separator was discharged directly into the Elk River (Figure 25) in accordance with the National Pollutant Discharge Elimination System163 permit number WV0045225. Section 5.3.1 discusses further details of Freedom’s NPDES permit.

163 NPDES is a permit program that makes it unlawful for a person to discharge any pollutant from a point source into waters of the United States, unless an NPDES permit is first obtained.

Freedom Industries, Inc. Investigation Report May 2017

51

Figure 25. Ice-filled oil/water separator discharge pipe into the Elk River. (Source: WVDEP) The site consisted of a storm drainage system including a 12-inch-diameter corrugated steel culvert that began on the northeast edge of the site and ran across and beneath the secondary containment area to the northwest edge of the site toward the Elk River. The culvert ran between tanks 394 and 395 and was approximately 30 feet north of tank 396. Figure 26 provides an approximate subsurface configuration of the culvert in a cross-sectional view. The exact location of where the culvert inlet began was unknown. A portion of the released material flowed to and along the culvert pipe bedding until it reached the culvert discharge location or outlet, which was located outside the secondary containment structure and drained into the Elk River (Figure 27).164

164 Civil & Environmental Consultants, Inc. Water Quality Sampling & Interim Remedial Measures Plan Tank 396 Release. Civil & Environmental Consultants, Inc.: Pennsylvania. January 26, 2014.

Freedom Industries, Inc. Investigation Report May 2017

52

Figure 26. Cross-section of culvert beneath the Freedom site between tanks 394 and 395. (Source: Civil & Environmental Consultants, Inc. January 20, 2014)

Figure 27. Water flowing through a corrugated steel culvert extending from the hillside (Left); stormwater pipe above interceptor trench (Right). (Source: WVDEP) After the January 9 release, stormwater from around the site continued to flow through the culvert pipe; however, pumping near the culvert inlet and inside the secondary containment area limited the quantity of water flowing outside the culvert pipe through the pipe bedding. In accordance with WVDEP, Freedom developed plans to investigate and remediate impacted soil and groundwater along the culvert. On January 18, 2014, site remediation contractors excavated a hole approximately 9 feet inside the east

Freedom Industries, Inc. Investigation Report May 2017

53

containment wall in an effort to locate the culvert. The bottom of the culvert had deteriorated and crumbled once the dirt was removed by the contractors. On January 29, 2014, three water samples were collected by WVDEP for comparison around the culvert: (1) near the culvert inlet, upstream of the secondary containment wall, (2) at the culvert discharge point along the slope facing the Elk River, and (3) from the exposed culvert inside the containment area. The samples were analyzed for 4-MCHM and the results are captured in Table 7. The results indicate that the water in and around the culvert was impacted by 4-MCHM and that there was a larger concentration in Sample 3 within the containment area as was expected during the remediation process. CSB investigators were able to photo-document the remnants of the excavated culvert left on the Freedom site more than a year after the incident (Figure 28).165 Table 7. Results for MCHM Samples around Culvert166 Parameter Sample 1 (Culvert Inlet) Sample 2 (Culvert Outlet) Sample 3 (Culvert Containment Area) 4-MCHM, mg/l167 0.036 0.074 0.180

Figure 28. Photo taken on June 15, 2015, of remnants of the culvert that ran between tanks 394 and 395 beneath the site. (Source: CSB)

165 West Virginia Department of Environmental Protection. Environmental Enforcement Inspector’s Report. West Virginia Department of Environmental Protection: West Virginia. January 18, 2014. 166 Ibid. 167 A milligram per liter (mg/l) is equivalent to one part per million (ppm).

Freedom Industries, Inc. Investigation Report May 2017

54

  1. 0 PUBLIC HEALTH CONSEQUENCE ANALYSIS

The magnitude of the January 2014 spill resulted in a significant public health response from local and state officials. Immediately following the incident, there was no publicly available information on the contents of tank 396 with the exception of the Eastman SDS for Crude MCHM, the main chemical constituent of the tank. With only the Eastman SDS available, public health agencies had little information to communicate to the public about the toxicity of the spilled chemical. In addition, Freedom revised its initial release estimate and communicated that another chemical was present in the tank after the DNU order was lifted in all areas. As the crisis evolved, new and conflicting information increased the public’s uncertainty about the safety of their drinking water.

  1. 1 Water Supply Contamination and Testing

Prior to the January 2014 incident, WVAW was aware that the site of the Freedom incident was a potential source of water contamination from a 2002 Source Water Assessment Report (see Section 5.4.1), but was unaware that Freedom stored Shurflot 944, a mixture of mostly Crude MCHM, and PPH, stripped, upstream of the intake. WVAW did not voluntarily request and review publicly available information, such as the Freedom site’s Tier II Emergency and Hazardous Chemical Inventory forms, to understand what chemicals were stored onsite. In addition, prior to the incident, WVAW was not required by applicable regulations to obtain such information for many of the compounds present in tank 396. Furthermore, no health standard or screening level had been established for those chemicals by any government agency. As a result, WVAW was not familiar with the chemical characteristics, sampling methods, or the ability of its filtration system to treat potential leaks of those chemical compounds.

WVAW asserts that, upon notification of the leak, it had two options to respond to the spill of the chemical into the public water supply: (1) close the Elk River intake, or (2) keep the intake open and rely on the WVAW treatment and filtration process. With only a few hours of tap water in reserve, WVAW chose to keep the intakes open and issue a water use restriction to avoid sacrificing fire protection and sanitation capabilities in the Charleston area and to maintain a water supply for industrial users. WVAW reported that the record-setting cold temperatures followed by warm weather in early January caused an increased number of water distribution line and pipe breaks throughout the system due to frost heave. In addition, customers kept faucets slightly running to prevent frozen pipes. These factors contributed to the low inventory of finished water, requiring WVAW to run at full capacity (43-45 million gallons per day). According to WVAW, shutting down the water treatment plant would have resulted in a prolonged outage, keeping customers without access to water for any purpose, including fire protection and sanitation capabilities, potentially longer than the DNU order was in place.168

When the WVAW Supervisor arrived at the Freedom property and observed the spill, he called back to the WVAW KVTP and instructed staff to begin adding PAC and additional potassium permanganate to enhance the treatment process. He was told by WVDEP that the leaked chemical was possibly a flocculant. WVAW did not attempt to verify this information until it received from Freedom an SDS for

168 House Transportation and Infrastructure Committee. Testimony of Jeffrey L. McIntyre. http://www.amwater.com/files/McIntyre%20Testimony%202%206%202014%20Final.pdf (July 11, 2016).

Freedom Industries, Inc. Investigation Report May 2017

55

Crude MCHM sometime before 2:00 PM that day, upon which the WVAW Supervisor discovered that the chemical was instead used as a frothing agent.169 Freedom provided WVAW with Eastman’s SDS for Crude MCHM, not the Freedom SDS for Shurflot 944, the product inside tank 396. Up until that point, WVAW states that it was confident that the treatment process could filter out the flocculant, since flocculants are often used in water treatment.

Shortly after 2:00 PM, an odor was detected in the WVAW raw water intake. The plant continued to monitor the water and began to notice an odor as it moved through the water treatment process, even after coagulant formula was added in the mixing changer area to the clarifier units. That afternoon, WVAW reviewed the toxicological information available on the Crude MCHM SDS and concluded that the listed acute toxicity was significantly lower than other chemicals that typically concern the facility.

Around 3:00 PM, WVAW assumed that the majority of the plume had traveled past the water treatment plant, based on observed foaming in the river. At 4:05 PM, the WVAW Manager for Water Quality and Environmental Compliance reported receiving a cup of the filtered water that had an odor, chemical taste and slight beige tint. Upon realizing the filters could not fully treat and remove the spilled chemical mixture, WVAW, WVBPH and other state officials discussed the leak with the West Virginia Governor’s Office. They discussed options for shutting down the plant and waiting for the plume to pass as well as issuing a DNU order. Because of the risk to sanitation and fire protection, a consensus decision was made to issue the DNU order in response to the leak.

Because WVAW claims it was not aware of the chemicals that Freedom stored upstream of the intake, and because there were no established sampling methods to determine the concentrations of the chemicals in the water, WVAW and WVBPH were unable to immediately communicate the risk of drinking water contamination to the public. Since WVAW lacked the capability to test for spilled chemicals, WVDHHR retrieved a sample of the water and WVAW sent it to its nearby Huntington Water Treatment Plant, which had a gas chromatograph-mass spectrometer,170 to test for organic chemicals. WVAW also coordinated with a research group within the DuPont Corporation and National Guard to develop a method to isolate the 4-MCHM in water.

  1. 2 Reported Symptoms after Drinking Water Exposure

After WVAW issued the DNU order, the West Virginia Poison Control Center began receiving calls with reports of rashes, nausea, vomiting and other symptoms.171 On January 9, WVBPH requested that CDC

169 WVAW obtained a copy of the SDS via email prior to 2:00 PM that day; however, the WVAW Supervisor was unable to view the document on his mobile phone while onsite. 170 Gas Chromatography Mass Spectrometry is a technique for the analysis and quantitation of organic volatile and semi-volatile compounds. Gas chromatography is used to separate mixtures into individual components using a temperature-controlled capillary column. 171 West Virginia Department of Health and Human Resources. Findings of Emergency Department Record Review from Elk River Chemical Spill. http://www.wvdhhr.org/communications/news_releases/DHHR%20Press%20Release%20- %20Findings%20of%20Emergency%20Department%20Record%20Review%20from%20Elk%20River%20Che mical%20Spill.pdf (July 9, 2016).

Freedom Industries, Inc. Investigation Report May 2017

56

determine the safe drinking water level for 4-MCHM, the main constituent of the leaking mixture. At that time, CDC could only rely on the information on the SDS and later, the proprietary toxicological data on Crude and 4-MCHM that Eastman made available on the evening of January 10. Furthermore, and unknown at the time of the spill, the leaked chemical was composed of various concentrations of different chemicals that made up Crude MCHM and PPH, stripped.

To better understand the impact of the chemical spill on the public, WVBPH began tracking emergency department visits and requested that ATSDR commence syndromic surveillance172 to analyze a total of 584 hospital charts of individuals who sought medical care at the emergency rooms in local hospitals from January 9 until January 23, 2014 (Figure 29). WVBPH and ATSDR further analyzed 369 of the 584 records of individuals who reported symptoms and exposure to the contaminated water. Of the reported symptoms, skin, eye and respiratory tract irritation are consistent with Crude MCHM exposure.173,174 Of the 369 people who visited local emergency departments, 13 (3.5%) were admitted for other chronic illnesses.175 The remaining 356 (96.5%) were treated and released. Some treatments included medications for nausea and itching, and intravenous fluids were also administered.176 Though the reports of symptoms corresponded with the first few days of the incident, WVBPH and ATSDR could not confirm if the contaminated water caused the symptoms. The syndromic surveillance report noted that the reported symptoms are similar to cold, flu and other common viruses.177

172 Syndromic surveillance programs are designed to detect unusual disease patterns, through the collection and combination of multiple electronic data sources during a release. Gelting, R. J.; Miller, M. D. Linking Public Health and Water Utilities to Improve Emergency Response. Universities Council on Water Resources. Journal of Contemporary Water Research and Education. 2004, 129, 22-26. 173 West Virginia Department of Health and Human Resources. Findings of Emergency Department Record Review from Elk River Chemical Spill. http://www.wvdhhr.org/communications/news_releases/DHHR%20Press%20Release%20- %20Findings%20of%20Emergency%20Department%20Record%20Review%20from%20Elk%20River%20Che mical%20Spill.pdf (July 9, 2016). 174 Eastman Chemical Company. Safety Data Sheet for Crude MCHM. Version 2.0. August 18, 2011. 175 Ibid. 176 Ibid. 177 Ibid.

Freedom Industries, Inc. Investigation Report May 2017

57

Figure 29. Summary of emergency department visits, January 9-23, 2014. (Source: WVBPH/CDC) The 369 treated individuals reported that the most common route of contaminated water exposure was skin contact through bathing and showering (52.6%). Second was ingestion (43.9%) and third, breathing a water mist of vapor (14.6%). Some treated individuals reported more than one possible route of exposure. The most common symptoms reported and documented at local hospitals were nausea, rash, vomiting and abdominal pain, with some individuals reporting more than one symptom (see Table 8). Hospitals reported that laboratory test results did not indicate acute kidney or liver damage as a result of exposure. WVBPH and CDC also found that individuals possessed symptoms associated with how they reported exposure to the water, such as nausea or vomiting from ingestion and skin irritation from bathing. Table 8. Symptoms Reported to Emergency Department, January 9-23, 2014 (Source: WVBPH/CDC) Symptom Number Percentage Nausea 141 38 Rash 105 29 Vomiting 104 28 Abdominal pain 90 24 Diarrhea 90 24 Headache 81 22 Itching 73 20 Sore throat 55 15 Eye pain 54 15 Cough 47 13

2 1 1 4 1 1 1 1 1 18 43 45 33 35 32 41 38 32 12 15 6 2 3 1 0 10 20 30 40 50 NUMBER OF VISITS EMERGENCY DEPARTMENT VISITS Admitted Treated and Released

Freedom Industries, Inc. Investigation Report May 2017

58

In early April 2014, a community assessment survey by WVDHHR through WVBPH in collaboration with CDC, revealed that many residents reported they had sought medical treatment at other medical facilities and some reported symptoms but did not seek medical treatment.178 In a Kanawha-Charleston Health Department (KCHD) telephone survey of 499 respondents (59.8% response rate), 31% of residents reported symptoms. Of those symptomatic residents, 45% sought medical care at a primary care physician, 27% at an emergency room and 25% at an urgent care facility.179 In addition, 25% of those residents reported symptoms prior to the issuance of the DNU order.180

  1. 3 Using Available Toxicological Information to Determine Acceptable Levels

for Acute Exposure At the onset of the spill, WVBPH asked CDC to establish a recommended screening level for 4-MCHM (see Appendix D for an explanation of toxicological studies). CSB learned that CDC only had the Eastman SDS for Crude MCHM immediately after the spill, which had little information that could be used to determine an exposure threshold.181 Once the significance of the spill was realized, Eastman released seven proprietary toxicological studies on the evening of January 10. Using available information from the Crude MCHM SDS and Eastman’s toxicological studies, CDC recommended a short-term screening level of 1 ppm (or 1,000 ppb) for 4-MCHM via ingestion only, that was not likely to be associated with any adverse effects.182

When determining the 1 ppm threshold for the short-term drinking water advisory, CDC used quantitative and qualitative information on exposures, the susceptibility of the population, the potential routes of exposure, and a number of uncertainty factors. CDC extrapolated downward from the available toxicological studies on Crude MCHM and 4- MCHM to recommend an exposure level not associated with any adverse health outcomes when ingested. The No Observed Effect Level (NOEL) was determined to be 100 mg/kg/day for lab rat oral ingestion of 4-MCHM.183 CDC used the body weight of a child, with an estimated ingestion of 1 liter of water per day, as the most sensitive population in the drinking water advisory calculation.184 In addition, CDC applied the highest uncertainty factors to account for the difference between animals and humans, sensitive humans and weaknesses in the toxicological evidence.

178 Center for Disease Control and Prevention. Disaster Response and Recovery Needs of Communities Affected by the Elk River Chemical Spill. http://www.dhhr.wv.gov/News/2014/Documents/WVCASPERReport.pdf (July 9, 2016). 179 Gupta, R. Public Health and the Largest Chemical Drinking Water Contamination Incident in US History. http://www.kchdwv.org/KCHD/media/KCHD-Media/PDF%20Files/WV-Chemical-Spill-Mountain-State- Symposium-5-9-14F.pdf (July 11, 2016). 180 Ibid. 181 The only information contained in the SDS for 4-MCHM was a Lethal Dose 50 for ingestion (LD50: (Rat): 825 mg/kg) and an LD50 for dermal exposure (>2000 mg/kg (Rat)). 182 Center for Disease Control and Prevention. Information about MCHM. 2014 West Virginia Chemical Release. http://emergency.cdc.gov/chemical/MCHM/westvirginia2014/mchm.asp (July 11, 2016). 183 Center for Disease Control and Prevention. Information about MCHM. 2014 West Virginia Chemical Release http://emergency.cdc.gov/chemical/MCHM/westvirginia2014/mchm.asp (July 11, 2016). 184 Centers for Disease Control and Prevention. Emergency Preparedness and Response. Information about MCHM 2014 West Virginia Chemical Release. Summary Report of Short-Term Screening Level Calculation and Analysis of Available Animal Studies for Crude and 4-MCHM. http://emergency.cdc.gov/chemical/MCHM/westvirginia2014/mchm.asp (July 11, 2016).

Freedom Industries, Inc. Investigation Report May 2017

59

After recommending the 1 ppm screening level, CDC ran additional computational toxicological models and verified that the 1 ppm determination, based on the Crude MCHM SDS and Eastman’s toxicological studies, was adequate for ingestion. An independent review by an expert panel composed of members from the National Toxicology Program (NTP), National Institute for Environmental Health Sciences, National Library of Medicine and the Departmental Office of Assistant Secretary for Emergency Response supported the drinking water advisory of 1 ppm established by CDC. The panel found that the method CDC employed was “a traditional approach185 that used reasonable and common assumptions to develop health protective drinking water health advisory levels”186 during the spill. In June 2016, the NTP completed a yearlong study to evaluate the toxicity of the chemicals similar in structure to those spilled in the Elk River and evaluate the adequacy of the screening level established by CDC. These studies also supported CDC’s recommended screening level of 1 ppm.187

Following the spill, initial testing of the water entering WVAW KVTP showed levels of 4-MCHM above the WVBPH/CDC health threshold of 1 ppm, which declined in the days following the spill. According to WVAW raw and finished water testing data provided to the CSB, at 5:00 PM on January 9, water entering WVAW contained levels of 4-MCHM measuring 13.7 ppm in the raw influent (river water) and 4.6 ppm after treatment at the plant tap (final product). On January 10, at 12:30 AM, water testing showed 4- MCHM in the raw water at WVAW measuring 1.04 ppm and 3.35 ppm, but in the outgoing water at 1.02 and 1.56 ppm, respectively (Figure 30).

185 CDC used the Environmental Protection Agency Health Advisory method described by Donohue and Lipcomb 2002. 186 West Virginia Testing Assessment Project. Report of Expert Panel Review of Screening Levels for Exposure to Chemicals from the January 2014 Elk River Spill. Toxicology Excellence for Risk Assessment. May 12, 2014. http://www.tera.org/Peer/WV/WV%20Expert%20Report%2012%20May%202014.pdf (September 24, 2016). 187 NTP Research Program on Chemicals Spilled into the Elk River in West Virginia. National Toxicology Program http://ntp.niehs.nih.gov/ntp/research/areas/wvspill/wv_finalupdate_july2016_508.pdf (September 25, 2016).

Freedom Industries, Inc. Investigation Report May 2017

60

Figure 30. 4-MCHM levels in influent (river water) and finished water (final product) at WVAW KVTP on January 9-12,

  1. (Source: WVAW)

As 4-MCHM concentrations decreased below the screening level, WVAW began to lift water restrictions and by January 18, the DNU was lifted in all affected areas. Water samples collected from WVAW’s raw water intake, distribution system and the community still had detectable concentrations of 4-MCHM in some areas at this time. 188 After the DNU was lifted, 4-MCHM concentrations within the distribution system were as high as 282 ppb in one area while other areas were below the detection limit of 2 ppb.189 Charleston-area residents remained skeptical of the safety of their drinking water even after WVAW lifted the DNU order.190 This is partly because residents could still smell the objectionable licorice-like odor in their water even after concentration levels were reduced well below the 1 ppm drinking water advisory. (Figure 31).

188 MCHM Operational Sampling Results. http://www.dhsem.wv.gov/Documents/1%20Copy%20of%20PUB%20MCHM%201APR14%201500.pdf; http://www.dhsem.wv.gov/Documents/Sampling%20Results/MCHM%20Test%20Results%20at%202ppb.pdf (February 6, 2017). 189 Ibid. 190 Office of the Governor. After Action Review. http://www.dhsem.wv.gov/West%20Virginia%20Public%20Water%20Supply%20Study%20Commission/Docu ments/After%20Action%20Review.PDFhttp://www.governor.wv.gov/Documents/After%20Action%20Review.P DF (Feburary 3, 2017).

Freedom Industries, Inc. Investigation Report May 2017

61

Figure 31. Equivalent concentrations of ppm, ppb and ppt notations. The CDC short-term screening level of 4-MCHM was 1 ppm. Studies regarding the odor threshold for 4-MCHM components suggest that some residents may have been able to smell odors in their water at levels as low as 0.060 ppb (60 ppt).191 (Source: CSB)

  1. 4 Deficient Crisis and Risk Communication

CSB concluded that the initial lack of information about the spilled chemical, combined with new and conflicting information becoming available as the crisis evolved, greatly affected the ability of public health agencies to credibly communicate the risk of the leaked chemicals following the incident. CSB evaluated aspects of the spill response against principles contained within the Department of Health and Human Services (DHHS) and CDC’s Crisis Emergency Risk Communication (CERC) (2014 Edition) manual. Public health professionals and public information officers apply elements of the CERC to effectively communicate during an emergency.192 The CERC manual defines risk communication as “information about the expected type (good or bad) and magnitude (weak or strong) of an outcome from a behavior or exposure.”193 Risk communication assists the public in making decisions on how to avoid adverse outcomes or how to respond to them, such as undergoing medical treatment.194 The CERC manual states that a public health crisis evolves through phases and it is essential that the communication evolves through these phases. The crisis and emergency risk communication life cycle includes the following phases: pre-crisis, initial, maintenance, resolution and evaluation. Figure 32 describes the phases in depth. Each phase requires its own type of information.

191 Gallagher et al., Tale of Two Isomers: Complexities of Human Odor Perception for cis- and trans-4 Methylcychohexanemethanol from the Chemical Spill in West Virginia. Environmental Science and Technology. 2015 49 (3), 1319-1327 DOI: 10.1021/es5049418. http://pubs.acs.org/doi/abs/10.1021/es5049418 (February 3, 2017). 192 Department of Health and Human Services, Centers for Disease Control and Prevention. Crisis and Emergency Risk Communication. 2014. http://emergency.cdc.gov/cerc/resources/pdf/cerc_2012edition.pdf (March 30, 2016). 193 Ibid. 194 Ibid.

Freedom Industries, Inc. Investigation Report May 2017

62

Figure 32. DHHS/CDC crisis and emergency risk communication life cycle. (Source: CDC)

During the pre-crisis stage, organizations responsible for responding to and providing public information about the crisis are expected to anticipate the types of disasters their jurisdiction might experience. CSB learned the Public Water Emergency Annex (B12) of the Kanawha Putnam Emergency Management Plan for the Charleston area addressed only isolated water system losses, not the complete loss of the water system.195 In the Kanawha Putnam Emergency Planning Committee (KPEPC) After Action Report (AAR) of the January 9, 2014 incident, four items were listed to be addressed as lessons learned from the spill:

  1. Expand assumptions to include other types of threats (e.g., complete loss of system).
  2. List all available resources (e.g., water tanks).
  3. Develop a public preparedness component.
  4. Role of public health in testing the water (e.g., bulk tanks).

The KPEPC AAR also identified the lack of a response plan at the state or county level for Crude MCHM because no information was available on the known hazards of the chemical.196

195 Kanawha Putnam Emergency Planning Committee. West Virginia American Water Incident. After Action Report. 2014. 196 Ibid. Pre-Crisis • Be prepared • Foster alliance • Develop consensus recommendations • Test messages Initial • Acknowledge the event with empathy • Explain and inform the public, in simplest forms, about the risk • Establish agency and spokesperson credibility • Provide emergency courses of action, including how and where to get more information • Commit to stakeholders and the public to continue communication Maintenance • Help the public more accurately understand its own risks • Provide background and encompassing information to those who need it • Gain understanding and support for response and recovery plans • Listen to stakeholder and audience feedback, and correct misinformation • Explain emergency recommendations • Empower risk/benefit decision-making Resolution • Improve appropriate public response in future similar emergencies through education • Honestly examine problems and mishaps, and then reinforce what worked in the recovery and response efforts • Persuade the public to support public policy and resource allocation to the problem • Promote the activities and capabilities of the agency, including reinforcing its corporate identity, both internally and externally Evaluation • Evaluate communication plan performance • Document lessons learned • Determine specific actions to improve crisis systems or the crisis plan

Freedom Industries, Inc. Investigation Report May 2017

63

Another aspect of the pre-crisis phase is to develop and test communication systems and networks. However, during the spill, the West Virginia Governor’s Office, WVBPH and WVAW were all reporting information to the public. The KPEPC AAR identified the lack of a unified command for Kanawha and Putnam counties, as well as the exclusion of the county health department from the command and control structure during the incident response.197

During the initial response phase, public health agencies must convey useful information to the public with instructions on what to do. According to the CERC manual, information must be as accurate as possible with the recognition that it is constantly changing and agencies must be willing to publicly acknowledge a gap in essential information. “Accuracy in what is released and the speed in which response officials acknowledge the event are critical at this stage.”198 During the maintenance phase, it is essential that public health agencies and emergency responders manage the information flow to the public by remaining in close coordination with all partners to avoid hyperbole and speculation.

In the days following the spill, local residents were given many instructions: a DNU order issued on January 9, which was lifted for some areas on January 13 with an advisory to flush their pipes; and then, on January 15, a drinking water advisory issued by WVBPH, in consultation with CDC, cautioning pregnant women to drink bottled water until “there are no longer detectable levels of MCHM in the distribution system.”199 These warnings and drinking water advisories were unclear and seemingly contradicted each other, with some occurring after the DNU was lifted for some areas (see Appendix A). On January 18, the DNU order was lifted for all areas;200 but on January 21, the President of Freedom announced that another chemical, a mixture of polyglycol ethers (PPH, stripped), was also released from tank 396 (Figure 33).201

197 Ibid. 198 Department of Health and Human Services, Centers for Disease Control and Prevention. Crisis and Emergency Risk Communication; 2014. http://emergency.cdc.gov/cerc/resources/pdf/cerc_2012edition.pdf (March 30, 2016). 199 State of West Virginia Department of Health and Human Resources Bureau for Public Health Commissioner Office. Water Advisory for Pregnant Women. http://www.dhsem.wv.gov/Documents/Advisory%20-%201-15- 2014.pdf (July 8, 2016). 200 Center for Disease Control and Prevention. Disaster Response and Recovery Needs of Communities Affected by the Elk River Chemical Spill. http://www.dhhr.wv.gov/News/2014/Documents/WVCASPERReport.pdf (July 9, 2016). 201 West Virginia Bureau of Public Health. CDC Statement on PPH. http://www.dhhr.wv.gov/News/chemical- spill/Documents/CDCstmtonPPH.pdf (July 8, 2016).

Freedom Industries, Inc. Investigation Report May 2017

64

Figure 33. Timeline of drinking water advisories and announcements issued to residents affected by the spill. (Source: CSB)

Finally, the KPEPC AAR found that one of the most challenging aspects of the spill from a response and public notification perspective was that Freedom did not provide reliable information during the first week of the incident in reporting the correct amount of chemical released from the tank.202 In addition to the fact that Freedom did not immediately disclose all chemicals contained in tank 396, Freedom would not or could not provide an accurate estimate of the quantity of chemicals that leaked. The amount changed from an estimated 1,000 gallons to 7,500 during the first week, to a revised total of 10,000 gallons on January 27, 2014.203

The resolution phase of the CERC life cycle provides an opportunity to reinforce public health messages, promote personal preparedness and obtain public buy-in to policies addressing the problem. However, surveys conducted by CDC and WVBPH found residents did not trust the public drinking water supply months after the spill (see Section 4.4.1).

202 Kanawha Putnam Emergency Planning Committee. West Virginia American Water Incident. After Action Report. 2014. 203 WVDEP. Freedom Revises Spill Estimate [press release]. Charleston, WV: West Virginia Department of Environmental Protection. January 27, 2014. http://www.dep.wv.gov/news/pages/Freedom-revises-spill- estimate.aspx (July 25, 2014).

Freedom Industries, Inc. Investigation Report May 2017

65

In the final evaluation phase of the CERC life cycle, responders and public health officials share learnings from the experience, document specific actions and recommendations to improve crisis communication, evaluate the communication plan and improve their pre-crisis activities.204 The success of future responses is contingent on adequately preplanning an effective communication strategy to the public. Lessons learned from the KPEPC AAR, in addition to the creation of new spill reporting requirements and the passage of Senate Bill (SB) 373 and 423 (see Section 5.2.2), attempt to ensure public health and emergency response agencies are prepared for future events in West Virginia. This report also shares lessons learned to encourage emergency planning and coordination between water utilities and public health agencies across the United States.

  1. 4.1 Public Distrust of Drinking Water Safety

On February 20, 2014, WVAW announced that levels of 4-MCHM in the water distribution system were below 10 ppb.205 The West Virginia Governor lifted the state of emergency on February 26, 2014, and CDC announced on March 3, 2014, that it found no evidence of adverse health effects to any segment of the population at 4-MCHM levels below 10 ppb for consumption.206 WVBPH found that by March 1, 5% of the population was drinking tap water, and in a survey conducted in April 2014 the number increased to 35-40%. A telephone survey administered in April 2014 by KCHD found that among 499 participants, about 54% believed the water was not safe to drink.207

As part of the public health response to the spill, CDC, at the request of WVBPH, also conducted a community survey called the Community Assessment for Public Health Emergency Response (CASPER) on April 8-10, 2014, to assist WVBPH in evaluating the response and improving future responses. CASPER had three objectives: (1) assess the perceived impact of the chemical spill on households, (2) provide WVBPH with information on household water use and practices before, during and after the DNU order, and (3) assess communications to identify effective approaches for current and future events.208

Results from 171 household interviews showed that most households were able to obtain water within one day of the spill and many stores quickly sold out of water; 21.7% of households reported one or more

204 Department of Health and Human Services, Centers for Disease Control and Prevention. Crisis and Emergency Risk Communication; 2014. http://emergency.cdc.gov/cerc/resources/pdf/cerc_2012edition.pdf (March 30, 2016). 205 WVAW. West Virginia American Water Update: All Samples Throughout Distribution System Below 10 Parts Per Billion: Flushing and Testing Continues to Help Address Odor; February 20, 2016. http://www.amwater.com/wvaw/customer-service/customer-communications/page25633.html (September 15, 2016). 206 Public Service Commission of West Virginia. PSC Initiates General Investigation into WVAWC’s Response to MCHM Spill. Public Service Commission of West Virginia: West Virginia. May 29, 2014. http://www.psc.state.wv.us/scripts/WebDocket/ViewDocument.cfm?CaseActivityID=397808&NotType=%27W ebDocket%27. 207 Latif, D. et al. Community Assessment Population Survey (CAPS). Communications during the West Virginia Water Crisis: A Survey of the Population. 2014. 208 Center for Disease Control and Prevention. Disaster Response and Recovery Needs of Communities Affected by the Elk River Chemical Spill. http://www.dhhr.wv.gov/News/2014/Documents/WVCASPERReport.pdf (July 9, 2016).

Freedom Industries, Inc. Investigation Report May 2017

66

health issues from the spill; and 3.5% reported mental health issues resulting from the spill. The survey also found that 37.4% of households actually used the drinking water during the DNU order, while 68.8% stated they used the water after the order was lifted. When asked whether they thought the water was safe to drink after the DNU order was lifted, 36.1% stated they agreed it was safe after the order was lifted.209 Recommendations from the CASPER survey report include, among others, asking households to prepare a 3-day water supply, improving communication during an emergency, increasing community education around water safety and promoting health and mental health services available to the community.210 In addition, to address the lack of chemical information available during the initial phase of the crisis, the KPEPC AAR recommends that all facilities submit detailed SDS and Tier II reports electronically to the local fire departments, KPEPC and State Emergency Response Commission. The recommendations also address reviewing the information collected on tanks that store chemicals near public water supplies under WV SB 373 to ensure adequate planning is occurring (see Section 5.2).211 4.5 Prior Chemical Release Incidents Investigated by CSB CSB investigated two other incidents in the Charleston area that resulted in acute chemical releases affecting both workers and the local community. In 2008, a 4,500-gallon pressure vessel exploded, releasing methomyl at the Bayer CropScience facility in Institute, West Virginia.212 Methyl isocyanate (MIC)213 is a highly toxic chemical used to produce methomyl. Bayer CropScience made MIC at the Institute site and stored it in a tank located approximately 70 feet from the exploding pressure vessel. The explosion killed two workers and injured six firefighters who were exposed to toxic chemicals.214 In addition, 40,000 residents including students at West Virginia State University were asked to shelter-in- place for three hours and local highways and roadways were closed for hours due to the smoke from the explosion.215

The second event was a series of toxic chemical releases that occurred on January 22-23, 2010, at the DuPont plant in Belle, West Virginia, when three gases—methyl chloride, oleum and phosgene— triggered an emergency response. In the five days leading up to the first incident on January 22, 2010, 2,000 pounds of methyl chloride were released from the distributed control system. Then on January 23, a leak in a sample pipe released a fuming cloud of oleum into the atmosphere, requiring the help of the

209 Center for Disease Control and Prevention. Disaster Response and Recovery Needs of Communities Affected by the Elk River Chemical Spill. http://www.dhhr.wv.gov/News/2014/Documents/WVCASPERReport.pdf (July 9, 2016). 210 Ibid. 211 Kanawha Putnam Emergency Planning Committee. West Virginia American Water Incident. After Action Report. 2014. 212 U.S. Chemical Safety and Hazard Investigation Board. Pesticide Chemical Runaway Reaction Pressure Vessel Explosion. http://www.csb.gov/assets/1/19/Bayer_Report_Final.pdf (July 11, 2016). 213 MIC is the toxic chemical that was released into the Bhopal community after an explosion at the Union Carbide facility in Bhopal, India. 214 Ibid. 215 Ibid.

Freedom Industries, Inc. Investigation Report May 2017

67

local fire department to mitigate.216 On the same day, a phosgene transfer hose failed, spraying a worker in the face as he was checking the weight of a 1-ton phosgene cylinder, fatally injuring him.217

In the Bayer CropScience report, CSB concluded that the incidents at both Bayer and DuPont revealed regulatory deficiencies that were not identified or corrected through voluntary compliance or existing enforcement mechanisms prior to the incidents. In addition, the Kanawha Valley contains many facilities that handle large quantities of acutely toxic and hazardous materials covered under similar regulatory programs. In January 2011, following the release of the Bayer CropScience investigation, CSB issued a recommendation to KCHD to create a Hazardous Chemical Release Program working in conjunction with WVDHHR and WVDEP. The Hazardous Chemical Release Program would authorize direct participation from state or local government programs in facility safety planning and oversight. In April 2011, Dr. Rahul Gupta, then head of KCHD, wrote to WVDHHR asking for support to commence such a program. In May 2011, WVDHHR denied KCHD support, stating, “We have always operated under the premise that the in-house health and safety oversight of chemical facilities lies within the purview of OSHA and the EPA. In addition, WVDEP issues permits for air and water emissions from these facilities which require their understanding of the processes which produce those emissions. At the current time, WVDHHR does not have the regulatory or technical expertise to implement the recommendations contained in the Board’s report.”

The chemical storage of Crude MCHM at the Freedom facility was not covered under performance-based standards such as OSHA’s Process Safety Management or EPA’s Risk Management Programs. In addition, the condition of Freedom’s tank 396 and secondary containment skirted enforcement due to WVDEP’s lack of inspections. On May 19, 2014, four months after the spill, KCHD wrote to the Speaker of the West Virginia House of Delegates to express its interest in establishing the Hazardous Chemical Release Prevention Program, stating, “It is our assertion that an existing Hazardous Chemical Release Prevention Program, as envisioned by CSB, would have provided our communities the best prospect of preventing disasters such as the January 9th Elk River chemical spill.”218

On March 8, 2014, the West Virginia Legislature passed SB 373, which established the Public Water System Supply Study Commission (PWSSSC) in order to study and report back to the legislature on several topics, including CSB’s recommendations from the Bayer CropScience incident of 2008.219 PWSSSC created four working groups, of which Working Group 4 was tasked with reviewing CSB’s recommendations, in particular the recommendation to establish a Chemical Release Prevention Plan within KCHD. People Concerned About Chemical Safety (PCACS)220 held numerous multisector stakeholder meetings through 2015 to review existing chemical release prevention programs at the federal and state levels and to create the outline of a Chemical Release Prevention Plan for Kanawha County,

216 U.S. Chemical Safety and Hazard Investigation Board. DuPont Corporation Toxic Chemical Releases. http://www.csb.gov/assets/1/19/CSB%20Final%20Report.pdf (July 11, 2016). 217 Ibid. 218 Kanawha-Charleston Health Department. May 19, 2014, Letter to the Honorable Tim Miley, Speaker West Virginia House of Delegates. CSB Doc Name: Attachment 2 WV Senate Concurrent Resolution 98. 219 http://www.legis.state.wv.us/wvcode/ChapterEntire.cfm?chap=22&art=31 (August 2, 2016). 220 People Concerned About Chemical Safety is a community organization in the Kanawha Valley that promotes environmental justice and chemical safety through education and advocacy.

Freedom Industries, Inc. Investigation Report May 2017

68

with eventual application to the State of West Virginia. Members of Working Group 4 participated in this process and ultimately concluded that PWSSSC agreed with CSB’s recommendations, and reported to the legislature that it should urge the Governor and West Virginia state agencies to implement CSB’s recommendation as outlined by the West Virginia Chemical Release Prevention Program Plan.

SB 373 also enacted Section 16-1-9e of the West Virginia Code, which calls for WVBPH to work with CDC and other federal agencies to “creat[e], organiz[e], and implement a medical study to assess any long-term health effects resulting from the chemical spill that occurred on January 9, 2014, and which exposed the public to chemicals, including 4-MCHM.”221 The responsibility for the long-term health effects study resides with the Commissioner of Health. To meet this requirement, WVBPH commissioned the National Toxicology Program to conduct a low birthweight study of babies born to women who were pregnant during the spill. The yearlong study, completed in June 2016, evaluated the toxicity of Crude and 4-MCHM and concluded that exposure at or below the screening level of 1 ppm is considered not likely to be associated with any adverse effects.222 Studies on exposures to pregnant lab animals via ingestion at levels well above the screening level were shown to produce low birthweights.223 NTP’s study of the prevalence of low birthweight children born to mothers expecting during the time of the spill found no evidence of low birthweights.224 4.6 AW and WVAW Response to Water Contamination 4.6.1 American Water Works Company, Inc. American Water Works Company, Inc.225 is the largest investor-owned and publicly traded water and wastewater utility company in the United States.226 AW is a Delaware-incorporated holding company and as such conducts its business operations through its subsidiaries.227 AW subsidiaries operate as regulated utilities in 16 states and serve an estimated 14 million people in more than 45 states and parts of

221 S.B. 373, 2014 W. VA 2015. http://www.legis.state.wv.us/Bill_Text_HTML/2014_SESSIONS/RS/bills/SB373%20SUB2.pdf (July 11, 2016). 222 National Toxicology Program. NTP Research Program on Chemical Spilled into the Elk River in West Virginia Final Update. http://ntp.niehs.nih.gov/ntp/research/areas/wvspill/wv_finalupdate_july2016_508.pdf (August 3, 2016). 223 Ibid. 224 Ibid. 225 American Water Works Company, Inc., together with its subsidiaries, including West Virginia American Water, is referred to as American Water in this report, however legally American Water is American Water Works Company, Inc. 226 AW subsidiaries operate approximately 80 surface water treatment plants, 500 groundwater treatment plants, 1,000 groundwater wells, 100 wastewater treatment facilities, 1,100 treated water storage facilities, 1,200 pumping stations, 90 dams and 46,000 miles of mains and collection pipes. In addition, AW and its subsidiaries have more than 6,400 employees. 227 United States Securities and Exchange Commission. Form 10-K Annual Report Pursuant to Section 13 or 15(d) of the Securities Exchange Act of 1934 for the Fiscal Year Ended December 31, 2014. American Water Works Company, Inc.: Voorhees, NJ. 2014. http://ir.amwater.com/Cache/29123208.PDF?Y=&O=PDF&D=&FID=27943982&T=&OSID=9&IID=4004387 (July 20, 2016).

Freedom Industries, Inc. Investigation Report May 2017

69

Canada.228 AW’s regulated subsidiaries are subject to economic regulation by state Public Utility Commissions (or in the case of West Virginia, the Public Service Commission) and water quality standards by EPA and/or state authorities.

AW’s complex business model includes two types of operations—those in which it owns the assets (regulated operations) and those in which it manages assets and provides water and wastewater services for a municipality or other entity (nonregulated operations). It serves residential homes and businesses but also performs nonregulated contract operations for municipalities that own their utility systems (Figure 34).229 AW’s corporate-level management efforts are generally decentralized, allowing its subsidiaries or utilities to address operational and jurisdictional issues in accordance with applicable federal, state and local laws and regulations, while encouraging coordination and information sharing among subsidiaries and support functions within American Water Works Service Company. AW’s business model and management approach allows the subsidiary or utility to be responsible for establishing its own internal processes regarding daily operations for the treatment and delivery of water to the community as long as these processes follow applicable federal, state and local laws and regulations.

AW has implemented general plans, policies and procedures that its subsidiaries are expected to follow. In addition, AW implemented practices that subsidiaries use as guidance and implement consistent with the facility- specific circumstances and local regulatory requirements; however, the practices are not requirements established by AW. In addition, AW does not formally monitor or track which plans, policies or procedures are followed by its utilities; however, AW indicated that it monitors implementation of the environmental policies and practices through internal audit functions and through formalized monthly reporting between state subsidiary environmental functions and American Water Service environmental department personnel and periodic meetings and conference calls. CSB reviewed many of the AW and WVAW plans, policies and procedures to determine how similar they were and whether they were followed on the day of the incident. Even though WVAW’s plans, policies and procedures mostly aligned with AW’s, the differences between them would not have changed the way in which WVAW responded to the incident, nor would they have prevented the mixture containing Crude MCHM and PPH, stripped from entering the water distribution system.

228 American Water. “West Virginia American Water Our States.” http://www.amwater.com/wvaw/About-Us/our- states.html (July 13, 2015). 229 American Water. “West Virginia American Water Corporate Information.” http://www.amwater.com/wvaw/About-Us/Corporate-Information/ (July 13, 2015).

Freedom Industries, Inc. Investigation Report May 2017

70

Figure 34. States in which AW operates.230 (Source: AW) As regulated public utilities, investor-owned water companies have been granted authority by each state’s PSC231 to operate in a particular service area. WVAW is regulated by the West Virginia PSC, which initiated an investigation into the MCHM leak on May 21, 2014, due to the numerous complaints received from WVAW customers. The focus of the PSC investigation is to determine whether WVAW’s actions in reaction to the spill and the presence of MCHM in its raw water or finished water supply constitute unreasonable or inadequate practices, acts or services as provided for in state law.232 The development of water quality standards is outside the scope of its investigation. The PSC investigation of the Freedom incident is ongoing. 4.6.2 Use of Boil Water and Do Not Use Notices Water utilities issue Boil Water Notices (BWNs) or Do Not Use Notices when conditions exist that have the potential to cause adverse public health effects.233 For example, consistent with WVDHHR rules and

230 American Water. Corporate Responsibility Report 2013-2014. 2015. http://amwater.com/files/American-Water- CR-2013-14.pdf (June 29, 2016). 231 In West Virginia, the Public Service Commission supervises and regulates the rates, services, operations and most other activities of all public utilities. PSC processes and acts on petitions filed by these regulated entities. It also acts on complaints against utilities and common carriers. 232 Public Service Commission of West Virginia. PSC Initiates General Investigation into WVAWC’s Response to MCHM Spill. Public Service Commission of West Virginia: West Virginia. May 21, 2014. http://www.psc.state.wv.us/press/2014/Press_20140521.pdf (May 23, 2016). 233 Appendix C discusses other instances where BWNs may occur.

Freedom Industries, Inc. Investigation Report May 2017

71

guidance, WVAW would potentially issue a BWN any time a customer service disruption occurs in the form of total loss of water or pressure below 20 pounds per square inch.234 WVDHHR requires that BWNs and DNUs be issued by the public water system as soon as practical, but no later than 12 hours after the public water system becomes aware of the conditions warranting a BWN or DNU. 235 In addition, a DNU is issued when boiling the water will not ensure that it is safe to drink and may have the opposite effect of concentrating contaminants, or when any chemical or hydrocarbon contamination of unknown quantity that may pose an immediate public health risk is present within a public water system. It is significant to note that in 2008 the “Boil Water Notices for Public Systems” procedure236 allowed for a 24-hour window to issue a BWN or a DNU; however, in 2009 this window was changed to 12 hours. At 11:56 AM, WVAW became aware of the spill, but it did not detect the MCHM in its filtered water until 4:18 PM and the DNU notice was issued at 5:45 PM.

WVAW did not receive any complaints of licorice-smelling water from customers prior to becoming aware of the release from Freedom. Even though the public notice was issued within the 12-hour time frame, the chemicals were still able to reach the drinking water supply for thousands of consumers, many of whom may have been using the water prior to the release of a public notice. Since the Freedom incident, West Virginia code now requires public water systems to develop a “communications plan that documents the manner in which the public water utility, working in concert with state and local emergency response agencies, shall notify the local health agencies and the public of the initial spill or contamination event and provide updated information related to any contamination or impairment of the source water supply or the system’s drinking water supply, with an initial notification to occur in any event no later than 30 minutes after the public water system becomes aware of the spill, release or potential contamination of the public water system.” WVBPH clarified this requirement through rulemaking stating that “initial notification to the public to occur in any event no later than 30 minutes after the public water system becomes aware that the spill, release or potential contamination of the public water system poses a potential threat to public health and safety.”237

In addition, on January 13, 2014, WVAW launched an interactive webpage, “Kanawha Valley Lift Zone Map,” that allowed the public to enter their residential or business address to determine if their home or business was within or near an affected area and provided the status of the water service. The interactive map was meant to be a general guide, and individuals who found themselves to be near an “alert boundary”238 were asked to contact WVAW directly for more specific information. The webpage also provided information on the DNU orders being lifted by zones. This information was also communicated

234 West Virginia American Water. Response to Main Breaks and Boil Water Advisories Maintaining Water Quality in the Distribution System. February 2009. 235 West Virginia Department of Health and Human Resources. Manual of Environmental Health Procedures Boil Water Notices for Public Water Systems Procedure DW-23. December 8, 2008, and June 6, 2009. 236 A DNU order is issued pursuant to Procedure DW-23 (“Boil Water Notices for Public Systems”) from WVDHHR’s Manual of Environmental Health Procedures. 237 West Virginia American Water Kanawha Valley Water System. Source Water Protection Plan. West Virginia American Water: West Virginia. June 2016. 238 Water systems are separated by pressure zones based on elevations. Public alerts typically affect pressure zones (not necessarily municipal boundaries). The alert boundaries on the interactive map were organized by pressure zones.

Freedom Industries, Inc. Investigation Report May 2017

72

through various media outlets and autodialer calls to affected homes and businesses. A temporary 24/7 hotline was established to provide additional clarification. 4.6.3 WVAW’s Monitoring and Testing Process According to a 2011 WVAW comprehensive planning study239 along with information provided by AW, plant operators at WVAW—in addition to their daily monitoring and testing practices240—conduct quarterly, annual and multiyear water quality sampling that is analyzed at the plant or in the AW Belleville, Illinois, laboratory. Selected contaminants of concern include inorganics, metals, minerals, pesticides, herbicides, priority pollutants, volatile organic chemicals and bacteriological parameters.241 Quarterly, WVAW tests for disinfection byproducts, including trihalomethane, and haloacetics are measured from eight locations in the distribution system. Total organic carbons and alkalinity are measured in samples taken from raw water and finished water. Annually, finished water is tested for inorganic chemicals, metals and minerals, arsenic, nitrate and Volatile Organic Carbons. Once every three years, in two consecutive quarters, finished water is sampled and measured for synthetic organic carbons. Lead and copper are also monitored every three years, with 50 samples taken at customer taps. Radiological materials are tested once every six years.

In April 2014, WVAW monitored for 30 contaminants (28 chemicals and two viruses) in accordance with EPA’s Third Unregulated Contaminant Monitoring Rule (UCMR3).242 The purpose of UCMR3 is to collect occurrence data for contaminants suspected to be present in drinking water but that do not have health-based standards set under the Safe Drinking Water Act (SDWA).243 4-MCHM is not one of the 30 contaminants listed under UCMR3 because it is not considered to be a common chemical found in source water, nor has the severity of the long-term health effects due to its presence in drinking water been fully examined, limiting its potential for inclusion in UCMR3. If WVAW voluntarily chooses to monitor unregulated contaminants other than those required by EPA, it makes those decisions based on the geographic location of the treatment plants and the potential contaminants that may affect the water. For example, WVAW monitors for bromides in West Virginia due to water treatment plants and their source waters being located near fracking activities and the potential for bromides to create trihalomethanes, which are regulated substances.

There is no regulatory requirement to implement a specific policy regarding monitoring or sampling and analytical methods for non-EPA regulated contaminants that are located near water intakes and that could potentially enter the water distribution system. Neither AW nor WVAW has a specific policy addressing monitoring or sampling and analytical methods for unregulated chemicals. After the Freedom incident, in

239 Comprehensive planning studies are used to assess the availability and reliability of the water supply. It allows WVAW to study, evaluate and adjust risk relative to water quality, quantity and service continuity. It also helps to plan for source water protection, drought management and emergency response. 240 WVAW’s daily monitoring and testing practices are discussed in further detail in Section 2.3.1. 241 American Water Asset Planning. West Virginia American Water Kanawha Valley System Comprehensive Planning Study. West Virginia American Water: West Virginia. May 2011. 242 West Virginia American Water. Document Request WVAWD01. West Virginia American Water: West Virginia. February 28, 2014. 243 SDWA requires EPA to evaluate contaminants that present the greatest health concern and to regulate those contaminants that occur at concentration levels and frequencies of public health concern.

Freedom Industries, Inc. Investigation Report May 2017

73

2015 AW implemented a “Source Water Quality Awareness Practice,” in an effort to maximize awareness of source water contamination issues. The practice provides general guidance to all AW utilities; however, the Source Water Assessment Program244 requirements in West Virginia established after the spill are much more rigorous and detailed than AW’s practice. 4.6.3.1 WVAW’s Hazardous Materials Removal Methods In 1989, WVAW and KVTP developed a report titled “Emergency Contingency Plan,” which examines deficiencies with respect to potential emergency events at the plant. The report identifies existing hazards, the resulting consequences of those hazards and some possible solutions. The report states that the maximum permissible length of plant shutdown should not exceed 12 hours because the total storage capacity at that time was less than one day’s supply. An average consumption per hour was 1.33 million gallons, and it would require eight hours to regain the loss.245 As part of the Emergency Contingency Plan, the recommended removal methods for the treatment of hazardous material spills within the water system were addressed. These removal methods include: • Accelerated biodegradation • Activated carbon • Aeration • Booms and skimmers • Burning • Ionic clays • Ion exchange • Neutralization—precipitation • Oleophilic materials • Peat moss • Vacuum pumping The plan includes a list of hazardous substances and the two phases of removal methods appropriate for each substance. The hazardous substances were identified with assistance by EPA and based on the degree of hazard to the water supply, the amount and concentration of a material, its properties and its effect on the waters to which it was introduced. When two phases of removal methods are available for a substance, phase I techniques must be applied prior to initiating phase II. Phase I removal methods are used if spilled material is not diluted (or still concentrated) or if the water supply contains both dissolved and undissolved spilled material. Phase II removal methods are used if spilled material has been diluted and is dissolved in the water supply. Of the six different chemical compounds listed on the Crude MCHM SDS (Table 3), methanol is the only hazardous substance listed in the plan. At the time the plan was developed, the site stored petroleum-based products, not Crude MCHM or PPH, stripped, which are not listed in the plan and are not regulated chemicals, nor are they identified as materials that would generally

244 The Source Water Assessment Program is discussed in further detail in Section 5.4.1. 245 West Virginia-American Water Company Kanawha Valley District. Emergency Contingency Plan. July 7, 1989, p. 16.

Freedom Industries, Inc. Investigation Report May 2017

74

be hazardous to a water supply.246 WVAW’s removal method for methanol involved phase I removal by aeration.247

In response to the Freedom release, WVAW decided not to close the water intake, which would have allowed the mixture containing Crude MCHM and PPH, stripped to bypass the intake. WVAW did not have accurate information regarding the extent of the spill or the length of the plume and was concerned that shutting the intake for more than a short time would lead to system depressurization that would prevent WVAW from delivering any water to customers for an extended period of time. It believed that its water treatment process could effectively handle the chemical, so it ultimately relied on its treatment process, including PAC and GAC to remove the chemicals. However, this removal method was not sufficient in eliminating the Crude MCHM or PPH, stripped, partly due to the volume of chemicals spills. Treatment methods can be critical tools in removing contaminants from the water; however, prevention is a superior approach where feasible, especially when addressing contaminants that cannot easily be removed from the water once they have been introduced. 4.6.4 AW and WVAW Emergency Preparedness and Response According to guidance from the American Water Works Association (AWWA), a water utility’s objectives in the initial response to a confirmed contamination event should be the “protection of its customers from exposure to the contaminated water, protection of the water utility infrastructure and health and environmental protection during disposal of contaminated water.”248 The actions WVAW took in response to the Freedom incident are discussed in detail in Section 2.1.2 of this report. However, it is also important to understand the corporate- and facility-level plans, policies and procedures WVAW should have followed when responding to and managing not only the Freedom incident, but all contamination incidents or events. This section will not only discuss the emergency preparedness and response plans AW and WVAW had in place at the time of the incident, but also identify the organizational and operational improvements WVAW made in response to the incident. 4.6.4.1 WVAW Incident and Event Management Practice On the day of the Freedom incident, WVAW implemented its Incident and Event Management Practice. This section outlines the AW policy from which WVAW’s practice was developed, describes WVAW’s practice in further detail and identifies an element of AW’s policy that WVAW did not implement. AW’s policy on incident and event management covers events of all sizes and types of risk. All AW business units and functions should prepare specific and adequate incident and event management procedures that are consistent with their policies and include the following:

  1. Safety management (e.g., people, environment, product, property).

246 West Virginia-American Water Company Kanawha Valley District. Emergency Contingency Plan. July 7. 1989, pp. 22, 22a-22l. 247 By artificially maintaining the required dissolved-oxygen level through mechanical aeration or other oxygen- replacement techniques, the lethal effects from the discharge of such substances can be eliminated. An alternative method to aeration for methanol removal is to burn the material; however, this method is to be used only after consultation with local authority, the federally appointed on-scene coordinator or approval by EPA. 248 Water Research Foundations (formerly AWWA Research Foundation). Guidance for Decontamination of Water System Infrastructure. Water Research Foundations: Colorado. 2007.

Freedom Industries, Inc. Investigation Report May 2017

75

and processes.

System (ICS). WVAW adopted an Event Management Practice (EMP) that is consistent with AW’s plans and adheres to the four levels of AW’s incident scale,249 principal event support team names and responsibilities/roles and criteria for events that must be reported to internal and external organizations. AW’s event scale is based on operational issues, such as safety, service or technical situations, environmental issues, and reputation and relationships. The level at which the event is managed is retained at the local operation or lowest level possible unless (1) a determination is made that indicates that level of management cannot adequately manage the event, or (2) the event has escalated. The practice involves seven major actions, which have been organized into “action cards” for ease of use during the decision-making process of an event:

AW provides standard ICS and AW Incident Management forms250 to assist in documenting and managing resources and operations of the incident or event; however, WVAW did not use these forms to document after-incident and event closedown actions; rather, it relied on e-mail to capture the decision- making processes post-incident. AW policy indicates that information within these forms should be augmented at the earliest opportunity to address the risks that, because of their nature, require more detailed measures and emergency plans.251 The EMP is reevaluated at least annually by the utility’s local operational risk management department and an annual drill is conducted unless the utility experienced a certain-level event within the year. This department also ensures that employees who may be involved in an incident are trained on the EMP, NIMS and ICS. On the day of the incident, not only did WVAW 249 AW’s incident scale provides a standard tool for the measurement of event risk and is used to indicate the severity, speed and scale of emergency response appropriate to the situation and the management effort required to resolve the situation. Level 1 is an alert and an opportunity to prepare for any deterioration, whereas Level 4 is a particularly severe event with significant implications for the business. 250 In addition, AW developed a “Business Continuity Planning Template,” which includes event preparation checklists and templates for a contingency plan for regional business units; however, these checklists and templates were not specifically designed to address water contamination due to hazardous materials spill events, although elements of the checklists and templates can apply to this type of event. 251 American Water. Incident and Event Management Practice. American Water: New Jersey. 2011.

Freedom Industries, Inc. Investigation Report May 2017

76

implement its Incident and Event Management Practice, but it also employed provisions of its Emergency Preparedness Manual and Consequence Management Plan.252 4.6.4.2 WVAW Emergency Preparedness Manual WVAW’s Emergency Preparedness Manual (EPM) is a guide for establishing appropriate actions to maintain service while involved in an emergency situation.253 The American Water Works System’s 1979 Emergency Procedures Handbook, which was the impetus for WVAW’s future emergency planning and preparedness manuals and plans, states, “A comprehensive emergency response plan, updated annually, is a requirement for any well managed company.” The handbook also indicated that the appropriate responsive action for a distribution contamination event should be: “Once it has been determined that actual contamination exists, immediately notify customers, in the affected area, disconnect services and remove meters there, isolate the area, and flush that part of the system.”

Prior to the January 2014 spill, the EPM was last updated in August 2012 and includes six policies. The final policy in the EPM is WVAW’s Security Plan (Terrorism) Policy, which contains procedures on how to accomplish tasks in accordance with established policies. The Security Plan was developed as newly recognized threats to the water system emerged. Within the Security Plan, WVAW maintains a crisis management program that emphasizes prevention and effective emergency preparedness, response and recovery. The program consists of planning, training and exercising, as well as coordination with the local jurisdictions with whom it contracts to provide water supplies and federal, state and local regulators.254 The policy states: “Within WVAW, responsibility for emergency response, management support, and crisis management is assigned to organizational units, based on either their vulnerability to hazards or their identified role to support response, or both. Accountability for the delivery of safe water to our customers begins with the senior executives of the company and extends downward through staff and managers of districts, individual facility supervisors, and individual associates.” WVAW developed procedures within this policy that identify general steps to take if contamination of a source or distribution system occurs. Even though these procedures were designed to be specific to intentional acts or events, they could also be applicable to an unintentional or accidental hazardous materials contamination event. The general process for addressing any event involves determining whether the source or system threatened is indeed part of WVAW. If it is, then appropriate sampling protocols are initiated in conjunction with appropriate local, state and federal environmental and law enforcement agencies. Also, if contaminants are present, public notifications are made.

252 AW developed a Consequence Management Plan (CMP) as a response component to its overarching Emergency Response Plan. The CMP aids in minimizing the impacts of not just intentional, but also accidental, water quality degradation as a streamlined plan that is intuitive to all critical water utility personnel. Consequence management actions are initiated upon identification of a possible contamination incident to (1) establish the credibility of the possible contamination incident, (2) minimize public health and economic consequences, and (3) guide the remediation and recovery effort. The plan itself guides a utility through actions that should be taken following detection of a possible water contamination incident. 253 West Virginia American Water Company. Policies 1:3 Authority of Emergency Procedures. West Virginia American Water Company: West Virginia. August 2012. 254 West Virginia American Water Company. Policies 1:6 Security Plan (Terrorism). West Virginia American Water Company: West Virginia. August 2012.

Freedom Industries, Inc. Investigation Report May 2017

77

In addition, separate from the Security Plan Policy, but contained within the EPM, WVAW developed a procedure to address situations where contamination of the distribution system occurs.255 This procedure identifies possible indicators of potential system contamination. One of the identified indicators is irregular taste, odor or color as reported by a customer (as was the case during the Freedom release) or as detected during routine sample collection. After Freedom’s release of chemicals into the Elk River, odors were detected during sample collection and at the tap by customers. The procedure provides steps that should be taken if contamination is suspected; however, the procedures do not provide detailed actions that should be taken by WVAW employees. Instead, they provide a general approach. The EPM contains another procedure on how to address situations where contamination of the raw water supply occurs.256 This procedure identifies steps that should be taken once a contaminant is detected.257 Distribution system contamination258 is a more serious public health problem than source water contamination259 because the contaminant may quickly reach the customer’s tap, as was the case after the Freedom release. Finally, the manual provides a comprehensive list of resources and entities, including local, state and federal agencies that are available to the company during an emergency event.260 4.6.4.3 AW’s Environmental Policy and Practices AW’s Environmental Policy outlines the company’s commitments to compliance with all relevant environmental laws, regulations and standards. Through this policy, AW has established related practices that provide more specific guidance to utilities. AW developed a practice titled, “Environmental Audit Process Practice” that ensures a utility’s compliance with applicable regulations and that tracks its environmental stewardship efforts, by linking its Environmental Management Plan system with an internal audit program. According to AW’s 2013-2014 Corporate Responsibility Report, the audit program reviews plans, procedures and physical facilities in an effort to identify potential vulnerabilities. The report indicates nearly all of AW’s facilities have been internally audited at least once during the past five years, and AW has developed a custom-designed audit tool that includes a risk-based list of questions. Based on the audit’s findings recommendations are developed, which address issues related to environmental regulation compliance, AW requirements or industry standards. Regulated utilities also submit monthly reports to department-level managers at the utility, which are expected to identify any significant incidents or noncompliance events. Information from these monthly reports is also discussed in regularly scheduled conference calls and meetings. These mechanisms allow for information exchange regarding a utility’s performance relative to regulatory requirements and AW policies and practices.

255 West Virginia American Water. Emergency Preparedness Manual Procedure 2:10. West Virginia American Water Company: West Virginia. August 2012. 256 West Virginia American Water. Emergency Preparedness Manual Procedure 2:11. West Virginia American Water Company: West Virginia. August 2012. 257 West Virginia American Water. Company Procedure List. West Virginia American Water Company: West Virginia. August 2012. 258 Distribution system contamination is where the contaminant has already reached the water treatment plant’s system of pipes that distribute water to the public. 259 Source water contamination is where the contaminant enters a surface water or groundwater prior to entering the water distribution system. 260 West Virginia American Water Company. Emergency Preparedness Manual. West Virginia American Water Company: West Virginia. September 2004.

Freedom Industries, Inc. Investigation Report May 2017

78

AW’s “Environmental Non-Compliance Reporting Practice” provides direction to utilities on the process for recording environmental instances of noncompliance. The practice applies to all environmental instances of noncompliance under the SDWA and the Clean Water Act (CWA). The practice also states that all employees are responsible for reporting environmental incidents of non-compliance including, but not limited to “failure to perform required sampling, notification of non-compliance from a regulatory agency, not meeting standards established by American Water, or an event that could have a substantial impact on public health or the environment.” AW tracks all enforcement authority notices of violations (NOVs) a utility may receive.261 On the day of the incident, WVAW reported the contamination event to AW because it was a catastrophic event, and no NOV was issued to WVAW by WVBPH. In addition, AW uses these NOVs to track and monitor instances of non-compliance across all environmental regulations and considers this process important in determining areas that need corporate attention and calculating drinking water compliance rates.262 4.7.4.4 AW and WVAW Post-Incident Improvements After the Freedom incident AW determined that improvements needed to be made in the areas of source water protection planning, exploration of alternative water sources and enhancement of the emergency customer notification system. Following the January 2014 spill and the associated legislative changes, WVAW installed analytical equipment and built a new $400,000 laboratory at KVTP equipped with two GC-MSs capable of testing the drinking water for volatile organic compounds and semivolatile organic compounds. It also conducted a study of early detection technology and has installed some source water monitoring equipment as a baseline level system.263 WVAW also installed source water monitoring technologies264 at treatment facilities at a cost of approximately $30,000 per facility. These devices are not intended to identify specific contaminants; rather, they alert water systems of a potential change in water quality, indicating a potential for further testing. This addition exceeds the monitoring requirements established by new state legislation.

In 2014, AW conducted a critical asset study that involved the use of EPA’s Water Health Economic Assessment Tool (WHEAT) to analyze the likelihood and consequences of the failure of water systems. WHEAT was designed to assist utility owners and operators in quantifying an adverse event’s public health consequences (i.e., injuries and fatalities), utility-level financial consequences, direct and indirect regional economic consequences and downstream impacts.265 Through this study, AW identified more than 50 critical water and wastewater system assets and, where applicable, recommendations for additional inspections, emergency response planning measures or capital improvements were made. In 2015, AW introduced a new customer emergency communication system, called CodeRED, which uses outbound calls to alert customers about incidents that could impact their water quality and water usage.

261 American Water. Environmental Non-Compliance Reporting Practice. American Water: New Jersey. 2010. 262 Ibid. 263 West Virginia American Water. 2014 Annual Water Quality Report. Elk River Regional System. PWS ID WV3302116 2015. http://www.amwater.com/ccr/kanawhavalley.pdf (November 2015). 264 WVAW’s source water monitoring technologies include continuous raw water quality monitoring with online, multiparameter devices. 265 EPA. Water Health and Economic Analysis Tool Version 3.0. EPA: Washington, DC. May 2014. https://www.epa.gov/sites/production/files/2015-04/documents/epa817f14003.pdf (May 25, 2016).

Freedom Industries, Inc. Investigation Report May 2017

79

AW also plans to develop outage maps that provide new direct notification to employees in the case of an emergency.266 In January 2016, WVAW updated the emergency contact information in KVTP’s Emergency Preparedness Manual and developed contingency and communications plans for the Kanawha Valley system as part of its source water protection planning process,267 which includes notification to the public within 30 minutes of becoming aware that a contamination event poses a potential risk to public health and safety.

This section provided an overview of the applicable AW and WVAW plans, policies, procedures and practices that existed or were implemented on the day of the incident. CSB’s review of WVAW’s emergency response highlights many important lessons that other water utilities may be able to learn from. 4.7 American Water Works Association Established in 1881, AWWA is the largest nonprofit, scientific and educational association dedicated to managing and treating water. AWWA has approximately 50,000 members, including American Water and West Virginia American Water, and one of its main goals is to support water utilities in evaluating and improving their water quality, operations, maintenance and infrastructure. AWWA offers education to water professionals by providing access to standards, water supply best practice manuals, training, networking, conferences and regulatory advisories.268 CSB found that AWWA is well positioned to assist water utilities by disseminating important lessons that are learned from chemical contamination incidents that could potentially affect a drinking water distribution system.

In addition, several different programs and types of publications are used to support AWWA’s mission. One key program is the AWWA standards process, which has existed for more than 100 years to produce peer-reviewed269 voluntary consensus standards for processes used by the water utility industry and intended to improve a utility’s overall operations and service. AWWA standards, which are American National Standards Institute (ANSI) approved, are recognized worldwide and have been adopted by many utilities and organizations. Through this program, AWWA publishes over 170 ANSI/AWWA standards that provide information on a variety of issues such as design, installation, disinfection, treatment and manufacturing of products including pipes, chemicals, storage tanks, valves, meters and other appurtenances; industry-recognized consensus prerequisites; and practices for water utility management and operations.270

266 American Water. Corporate Responsibility Report 2013-2014. American Water: New Jersey. 2015. 267 The source water protection planning process is discussed in further detail in Section 5.4.1. 268 http://www.awwa.org/about-us.aspx. 269 These standards are developed by following procedures defined by committees under the AWWA Standards Council and accredited by the American National Standards Institute. 270 http://www.awwa.org/resources-tools/resource-development-groups/standards-program/standards-development- process.aspx (August 2, 2016).

Freedom Industries, Inc. Investigation Report May 2017

80

Two AWWA standards could be helpful to water utilities in the areas of source water protection and emergency preparedness. First, AWWA’s Source Water Protection Standard271 provides support and guidance for a drinking water utility to protect its drinking water supply sources through planning, developing and implementing a successful source water protection program. Second, AWWA’s Emergency Preparedness Practices272 is a voluntary management standard that is used to define the minimum emergency preparedness requirements for water utilities to respond to emergencies and restore normal operations, minimizing the disruption of critical services while sustaining public health, protecting property and maintaining consumer confidence.

271 American National Standards Institute/American Water Works Association. G300-14: Source Water Protection. 2010. 272 American National Standards Institute/American Water Works Association. G440-11: Emergency Preparedness Practices. 2011.

Freedom Industries, Inc. Investigation Report May 2017

81

  1. 0 REGULATORY ANALYSIS
  2. 1 Regulatory Summary of Crude MCHM and PPH, stripped

Both Crude MCHM and PPH, stripped are hazardous chemicals according to OSHA’s Hazard Communication Standard (HCS). These mixtures are hazardous chemicals because of the physical and health hazards they pose. As a result, any distributor storing these chemicals must have available an SDS and provide it to downstream users.

Any distributor or manufacturer of hazardous chemicals is also regulated under the Emergency Planning and Community Right-to-Know Act (EPCRA). Any distributor storing more than 10,000 pounds of either MCHM or PPH, stripped must submit a Tier II form alerting its Local Emergency Planning Committee (LEPC) of the amount stored. Table 9 outlines the applicability of relevant statutes and regulations covering chemicals. The terms “hazardous chemical” and “hazardous substance” have very different meanings under various laws, and although MCHM is a hazardous chemical,273 it is not listed as a hazardous substance.274 Table 9. Applicability of Various Federal Regulations to MCHM Stored at Freedom Agency Regulation or Statute Yes No OSHA HCS – 1910.1200 – “Hazardous chemical” 

EPA EPCRA § 311 and § 312 – “Hazardous chemical” 

EPA Clean Water Act § 311 – “Hazardous Substance”

 EPA EPCRA § 302 – “Extremely hazardous substance”

 EPA EPCRA § 313 – “Toxic chemical”

 EPA Comprehensive Environmental Response, Compensation, and Liability Act – “Hazardous substance”

 EPA Resource Conservation and Recovery Act – “Hazardous waste”

 EPA Clean Air Act 112(r) – Regulated Chemicals for Accidental Release Prevention

273 The term “hazardous chemical” in this report shall mean any chemical that poses physical or health hazards as defined by OSHA under the HCS. See Section 5.7.1. 274 Section 311 of the Clean Water Act required EPA to establish regulations designating hazardous substances and determining those quantities of any oil and hazardous substances, the discharge of which may be harmful to the public health or welfare or the environment of the United States, including but not limited to fish, shellfish, wildlife, and public and private property, shorelines and beaches. 33 U.S.C. § 1321(b). Table 117.3 in 40 C.F.R. 117.3, which is titled “Reportable Quantities of Hazardous Substances,” lists substances that were designated hazardous under Section 311(b)(4) of the CWA. Currently, approximately 300 chemicals are listed. Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) defines a hazardous substance as any substance designated a hazardous substance under the CWA as well as certain substances having certain characteristics under other environmental statutes or included on other EPA lists. Approximately 2,000 elements, compounds, mixtures, solutions and substances are considered CERCLA hazardous substances, which, when released into the environment, may present substantial danger to the public health or welfare or the environment. 42 U.S.C. § 9601-9602.

Freedom Industries, Inc. Investigation Report May 2017

82

  1. 2 Regulation of Aboveground Storage Tanks

ASTs are subject to both federal and state/local regulations. One of those federal regulations is the Spill Prevention, Control and Countermeasure rule, which was promulgated under the authority of the CWA. Although the SPCC rule regulates some aspects of ASTs,275 its applicability is limited to oil.276 Because Freedom stored fatty acid, an oil, in an AST onsite, it was required to adhere to SPCC requirements. While not a direct cause, CSB found that compliance with certain SPCC requirements, such as secondary containment, may have helped prevent the incident because of the proximity of Freedom’s fatty acid AST to the AST that leaked.277

Other federal regulations are similar in that they apply only to particular storage tanks or containers that contain certain chemicals or classes of chemicals. Another example is OSHA’s flammable liquids standard. Like SPCC, this regulation applies only to tanks or vessels containing certain liquids, in this case flammable liquids. For a full discussion of OSHA’s flammable liquids standard, see Section 5.7.2. Because no uniform federal program regulates all ASTs, owners must navigate a web of miscellaneous statutes and regulations that directly or indirectly govern tanks, and states are left to fill those gaps with regulations.

At the time of the 2014 spill, ASTs in West Virginia were inadequately regulated. The West Virginia legislature had established a comprehensive statutory framework in 1984 regulating underground storage tanks, but it did not address ASTs. Additionally, some tanks, like those found at Freedom that were regulated under some other applicable federal or state permits, also escaped strict oversight from the West Virginia government due to a lack of inspections as a result of constrained resources.278 A Groundwater Protection Plan (GPP) and Stormwater Pollution Prevention Plan (SWPPP) were both required to be completed by Freedom and held onsite for Freedom’s NPDES renewal; however, West Virginia did not require that these plans be submitted or verified by WVDEP prior to the renewal of an NPDES permit.

275 SPCC applies to ASTs holding oil in aggregate amounts greater than 1,320 gallons. 276 Oil means oil of any kind or in any form, including, but not limited to: fats, oils, or greases of animal, fish, or marine mammal origin; vegetable oils, including oils from seeds, nuts, fruits, or kernels; and, other oils and greases, including petroleum, fuel oil, sludge, synthetic oils, mineral oils, oil refuse, or oil mixed with wastes other than dredged spoil. 40 C.F.R. § 112.2 (2016). 277 The Freedom facility was found to have fatty acid in bulk storage above the SPCC threshold, based on sampling by EPA after the incident. Thus, Freedom Industries should have prepared an SPCC plan, had it certified by a Professional Engineer and implemented appropriate secondary containment for oil containing tanks. Given the proximity of the fatty acid tank to the Crude MCHM and PPH tanks it is a possibility that tank 396 would have been located within the bounds of this secondary containment. SPCC plans are not required to be submitted to EPA. Further discussion of SPCC follows in Appendix E. 278 West Virginia contains more permitted Industrial Stormwater facilities than WVDEP’s inspection resources can meet. Therefore, WVDEP has committed to inspecting 10% of these facilities annually in exchange for an EPA grant. Although the list of facilities to be inspected is refreshed every year, there is some overlap of facilities year to year. Freedom Industries was never included on the list of facilities to be inspected when WVDEP began receiving this grant in 2007. Due to the limited resources available, WVDEP’s compliance strategy focuses on major facilities that discharge more than 1 million gallons per day. There is an ongoing effort at WVDEP to incorporate the Zone of Critical Concern into the NPDES monitoring strategy, which may allow seemingly innocuous facilities to be included in the list of facilities to be inspected, given their proximate location to water intakes.

Freedom Industries, Inc. Investigation Report May 2017

83

Further, the Groundwater Protection Rule (GPR) required secondary containment for all Freedom tanks; however, Freedom was never inspected for compliance with this rule, largely because prior to the AST Act, which now regulates ASTs in West Virginia, Freedom was not regulated under a WVDEP program that would have resulted in regular inspections or site visits.279

Some of the notable deficiencies identified in West Virginia’s regulatory regime at the time of the incident include the lack of regulation when constructing ASTs, as well as the lack of required inspections for existing tanks and secondary containment. The following provides an overview of the applicable statutes and regulations relevant to the Freedom investigation and an overview of West Virginia’s new AST regulatory regime, which addresses many of the deficiencies identified by CSB. 5.2.1 Groundwater Protection Rule As mentioned in the previous section, West Virginia has state groundwater protection regulations imposing certain requirements on industrial sites to protect the groundwater. Freedom was subject to the West Virginia GPR;280 however, this rule generally applies to industrial sites and was not designed to specifically regulate ASTs. Without consistent inspections for compliance and proper enforcement, the Freedom incident was able to occur despite the requirement for adequate secondary containment. As a result of the AST Act, WVDEP is now required to conduct regular inspections of regulated tanks. In the process of ensuring all requirements of the AST Act are being met, WVDEP will also be afforded more opportunities to check for compliance with the GPR. Before the AST Act was enacted, GPR requirements were mainly enforced during required inspections under other more specific statutes. Because ASTs in West Virginia were not directly regulated, facilities such as Freedom that did not fall under a more specific regulatory regime were required to comply with the requirements of the GPR, but WVDEP did not routinely inspect those facilities for compliance.

The GPR required Freedom to have a GPP281 and secondary containment “that is appropriate” considering the potential to contaminate groundwater.282 Like the federal SPCC program, the GPR attacks the problem from a containment standpoint and imposes stricter standards on those facilities more susceptible to groundwater pollution. Like the federal SPCC rule for oil tanks, the major provisions of the GPP require containment areas in order to control and hold any leaked chemicals from ASTs at industrial sites. Freedom was required to have adequate pollution prevention controls including secondary containment, which could have potentially prevented the spill into the Elk River. The GPP was not enforced, however,

279 W. VA. CODE R. § 47-58 (1994). As a result of the AST Act, WVDEP is now aware of the universe of tanks located in West Virginia and is required to conduct tank inspections every three years for Regulated Level 1 tanks. During these inspections, WVDEP can ensure compliance with the AST Act as well as with groundwater protection regulations. 280 W. VA. CODE R. § 47-58 (1994). 281 W. VA. CODE R. § 47-58-4.11 (1994). 282 W. VA. CODE R. § 47-58-4.8a (1994). “Above-ground storage tanks shall have secondary containment that is appropriate considering the potential to contaminate groundwater. Such secondary containment shall be adequately designed and constructed to contain the materials for a time sufficient to allow removal and disposal without additional contamination of groundwater, but in no case will that time be less than seventy-two (72) hours.”

Freedom Industries, Inc. Investigation Report May 2017

84

and the lack of WVDEP inspections allowed Freedom to continue to operate with deteriorated and inadequate secondary containment. 5.2.2 West Virginia’s Aboveground Storage Tank Act In the aftermath of the Freedom incident, the West Virginia legislature recognized that the contents of ASTs, some potentially hazardous, may not be stored in a safe manner to protect people and the environment.283 As a result, the legislature unanimously passed a comprehensive AST bill, SB 373, which imposed strict requirements on all tanks and vessels in West Virginia that met a broad definition. However, soon after, the legislature passed SB 423, which removed some of the unintended consequences of 373.284

SB 423 was passed on March 14, 2015, became effective June 14, 2015, and is known as The 2015 Aboveground Storage Tank Act (AST Act). It created three categories of ASTs partially based on their location and placement near public water supplies. Although the requirements of the bill that passed are less strict than originally drafted, the AST Act addresses many of the issues that led to the failure of the tanks at Freedom.

The AST Act divides tanks285 into three main categories. Once a tank meets the definition of AST, the tank is subject to a certain level of regulation based on its size, what it is storing and/or its location. Various requirements are imposed based on whether the tank falls in one of those categories. These categories include requirements that apply to all ASTs, specific requirements that apply to regulated Level 1 tanks and specific requirements that apply to regulated Level 2 tanks.

Although the statute imposes some requirements on tanks in the state, it also directs WVDEP to develop a comprehensive regulatory program. On July 31, 2015, after completing a public comment period and a public hearing, WVDEP filed an agency-approved rule, as required under the AST Act, with the Legislative Rule-Making Review Committee (LRMRC). LRMRC made changes to the rule, then WVDEP modified the rule based on those changes and filed the modified rule on November 23, 2015, with the West Virginia Secretary of State. However, before a rule becomes effective in West Virginia, it is packaged into a bill and must be passed by both houses of the legislature and then signed by the Governor. The West Virginia legislature failed to act on the bill that included the AST rule before the 2016 session ended, so the rule was not approved. The Aboveground Storage Tanks Rule (Rule) was reintroduced during a special legislative session in June and was passed by the legislature and signed by the Governor. The Rule is effective as of August 1, 2016. What follows is a discussion of the relevant sections of the AST Act and Rule and the role they could have played in preventing the Freedom incident.

283 W. VA. CODE § 22-30-2 (2015). 284 For example, farmers’ water troughs being regulated. 285 As amended by SB 423, W. VA. CODE § 22-30-3 provides that an AST is partially defined as a device that contains 1,320 gallons of fluid, of which 90% is above the surface of the ground. This term includes both stationary and mobile devices that remain in one location for at least 365 days. The definition excludes 12 categories of vessels that are not subject to the provisions of the article despite potentially fitting the above description, including swimming pools, process vessels and devices containing drinking water.

Freedom Industries, Inc. Investigation Report May 2017

85

  1. 2.2.1 All ASTs

All ASTs286 in West Virginia are now subject to certain requirements including registration and signage

requirements. Owners must submit a registration form that, at a minimum, shall identify the following:

Ownership of the tank

Tank location

Date of installation, if known

Type of construction

Capacity and age of tank

Type of fluid stored therein287 Owners must also identify any other permits or licenses the tank is subject to and provide the numbers of those permits or licenses.288 As of August 30, 2016, 39,605 tanks (Figure 35) in West Virginia are registered with WVDEP. WVDEP has created a registration form that requires not only the information listed above but also information on corrosion protection and secondary containment.289 The information gathered through registration will be available to the public subject to the limitations contained in Section 14 of the AST Act and West Virginia’s Freedom of Information Act.290 This information will be especially useful in the event of a release to the waters of the state, which could affect a public water supply. Upon such a release, information shall be promptly made available to any emergency responders attending to the site of a spill or release and the general public shall be promptly notified.291 Additionally, when new owners acquire a tank, they must register it within 30 days after acquisition.292

286 This includes ASTs as defined in the AST Act and not specifically exempted under the AST Act or AST Rule. 287 W. VA. CODE § 22-30-4 (2015). 288 W. VA. CODE § 20-30-4 (2015). 289 Aboveground Storage Tank Registration Form. WVDEP. https://apps.dep.wv.gov/ast/Sampleastform.pdf (August 2, 2016). 290 W. VA. CODE § 22-30-14 (2015). 291 Ibid. 292 W. VA. CODE R.§ 47-63-3.1.c.2 (2016).

Freedom Industries, Inc. Investigation Report May 2017

86

Figure 35. Breakdown of all registered ASTs in West Virginia by tank level as of August 2016. (Source: WVDEP) All tanks in West Virginia are also required to display, either near the tank or on the tank itself, its registration number, the emergency contact number for the owner and the number for WVDEP’s Spill Reporting Hotline.293

WVDEP is also empowered to require the owner of any AST to undertake prompt corrective action in certain instances. These actions must be necessary to protect human health, water resources and the environment from contamination.294 WVDEP may also conduct inspections, require tank owners to furnish information and enter the tank owner’s property for the purposes of developing or assisting in the development of any rule.295

Additionally, the location, characteristics and approximate quantities of any potential sources of significant contamination within the zone of critical concern (ZCC) or the zone of peripheral concern (ZPC) shall be made known to one or more designees of the public water utility.296 This information will

293 W. VA. CODE § 22-30-11 (2015). 294 W. VA. CODE § 22-30-8 (2015). Once rules are promulgated, the Secretary must follow those rules unless certain extenuating circumstances exist. 295 W. VA. CODE § 22-30-15 (2015). 296 W. VA. CODE § 22-30-14 (2015). 5,269 2,939 31,397 Tank Level All Tanks Level 1 Tanks Level 2 Tanks All Other Registered Tanks

Freedom Industries, Inc. Investigation Report May 2017

87

allow water utilities to plan and make more informed decisions regarding when to close an intake in the event of a spill. 5.2.2.2 Level 1 and 2 Regulated Tanks297 The AST Act defined regulated ASTs and required WVDEP to develop a regulatory program for new and existing aboveground storage tanks.298 Unless approved by WVDEP owners or operators of regulated tanks are subject to all of the requirements of the regulation.299 Regulated tanks are broken down into two different levels and are subject to requirements in addition to the registration and labeling requirements described above. Level 1 tanks are regulated to a higher standard than Level 2 tanks given their location, capacity and the chemicals stored. Given the location of Freedom’s tanks within a newly defined ZCC, the tanks would have been subject to the more stringent requirements for Level 1 tanks.

Of the 39,605 registered tanks in West Virginia, 5,269 of those are considered Level 1 tanks (Figure 35). Level 1 tanks consist of ASTs located within a ZCC, a source water protection area300 or public surface water influenced groundwater supply source area,301 or any other AST designated by WVDEP.302 Level 1 tanks also include any tanks containing a CERCLA hazardous substance or a substance on the List of Lists in a concentration of 1% or greater,303 excluding tanks containing petroleum.304 Finally, any tank

297 Many of the requirements apply to both Level 1 and Level 2 tanks. When a requirement is specific only to a certain level of regulated tanks, it will be explicitly stated as such. 298 These regulations are outlined in the AST Rule which can be found at W. VA. CODE R. § 47-63 (2016). 299 Entities regulated under certain site-specific permits or plans that require appropriate containment and diversionary structures to prevent discharged released material from reaching waters of the state may submit a request to have those permits amended to include conditions sufficient to protect the waters of the state. This would include NPDES permits, SPCC plans and GPPs. These amended plans would have to be approved by WVDEP and must include a statement indicating which industry standards (including but not limited to API 653, “Tank Inspection, Repair, Alteration, and Reconstruction”) will be followed. If WVDEP approves the amended plan owners will be required to comply with all industry standards identified as applicable. Further, so long as the entity is compliant with the registration requirements of Section 4 of the AST Act, they will be deemed to be compliant with the rest of the AST Act and entitled to a certificate to operate. These entities will also be required to complete inspections and formal tank certifications. Until the permits or plans are amended and finalized, all requirements of the AST Act and its Rules are applicable. W. VA. CODE § 22-30-5(c) (2015); W. VA. CODE R. § 47-63-4.2 (2016). 300 W. VA. CODE § 22-30-3(19) (2015). “Area within an aquifer that supplies water to a public water supply well within a five-year time-of-travel, and is determined by the mathematical calculation of the locations from which a drop of water placed at the edge of the protection area would theoretically take five years to reach the well.” 301 W. VA. CODE § 22-30-3(11) (2015). “A source of water supply for a public water system which is directly drawn from an underground well, underground river or stream, underground reservoir or underground mine, and the quantity and quality of the water in that underground supply source is heavily influenced, directly or indirectly, by the quantity and quality of surface water in the immediate area.” 302 W. VA. CODE § 22-30-3(13) (2015). 303 The List of Lists is a list of chemicals created by EPA that includes hazardous chemicals regulated under applicable statutes. The list includes Extremely Hazardous Substances regulated under Section 302 of EPCRA, CERCLA Hazardous Substances, EPCRA Section 313 Toxic Chemicals and Clean Air Act 112(r) Regulated Chemicals for Accidental Release Prevention. 304 W. VA. CODE § 22-30-3(13) (2015).

Freedom Industries, Inc. Investigation Report May 2017

88

with a capacity of 50,000 gallons or more, regardless of its contents and location, is considered a regulated Level 1 tank.305 Figure 36 provides a breakdown of Level 1 tanks in West Virginia.

Figure 36. Level 1 tanks in West Virginia and Reason for Designation as of August 2016. (Source: WVDEP)

Included in this definition is the term “zone of critical concern,” which is one of the most pertinent definitions as it relates to facilities like Freedom. The ZCC is a corridor along streams within a watershed that warrants detailed scrutiny due to its proximity to the surface water intake and the intake’s susceptibility to potential contaminants within that corridor.306 The ZCC is based on a 5-hour time-of- travel of water in the streams to the intake.307 The width of the ZCC is 1,000 feet measured horizontally from each bank of the principal stream and 500 feet measured horizontally from each bank of the tributaries draining into the principal stream.308 Because of the proximity of Freedom Industries to the Elk River and the WVAW intake, the facility is located within the ZCC and therefore would have been subject to the most stringent requirements under the AST Act as a regulated Level 1 tank.

Regulated Level 2 tanks consist of ASTs located within a ZPC that are not regulated Level 1 tanks. A ZPC is a corridor that extends upstream of a public water system intake and is defined by a formula

305 Ibid. 306 W. VA. CODE § 22-30-3(20) (2015). 307 Ibid. 308 Ibid. 1,463 497 318 2,991 Level 1 Tanks Reason for Designation List of Lists

50k (not in ZCC or Source

Water Protected Area) Source Water Protected Area Zone of Critical Concern

Freedom Industries, Inc. Investigation Report May 2017

89

devised to calculate the distance water will travel in 10 hours.309 The width of the ZPC is 1,000 feet measured horizontally from each bank of the principal stream and 500 feet measured horizontally from each bank of the tributaries draining into the principal stream.310 Of the 39,605 registered tanks in West Virginia, 2,939 are regulated Level 2 tanks.

Each owner or operator of a regulated AST was required to submit a Spill Prevention Response Plan (SPRP) to WVDEP by December 9, 2015.311 The AST Act required that these plans be submitted by the deadline and be updated and resubmitted no less than every five years. These plans must, among other things, fulfill the following:

  1. Describe the activity and inventory of types and amounts of fluid stored as well as reference the

location of the SDSs.

  1. Describe preventive maintenance programs, monitoring and inspection procedures, and employee

training programs.

  1. Describe general release response procedures.
  2. Provide contact information for state, county and municipal emergency management agencies and

the nearest downstream public water supply intake, and designate persons to be notified. Owners and operators must also submit a revised plan or addendum under certain circumstances, such as if tank equipment has undergone substantial modifications or if tanks are removed or added. As explained earlier, Freedom did not have a comprehensive preventive maintenance program and would have been required to establish one had this regulation existed prior to the incident. These plans are subject to approval by WVDEP and, if rejected, owners and operators have 30 days to submit a revised plan. Further, failure to comply with an approved plan is considered a violation of the code.312

However, in lieu of developing an SPRP, the owner of a regulated AST may certify to the Secretary that the AST system is subject to a GPP or SPCC plan.313 Although not required to be resubmitted to the AST program, these plans must be available upon request314 and are requested prior to a WVDEP inspection to ensure that they include all associated ASTs and meet the requirements of the AST Act. If WVDEP determines that the plans do not meet the requirements, tank owners will be required to either update or develop an SPRP. WVDEP will review these plans at least once every three years for Level 1 tanks as part of the inspection process.

309 W. VA. CODE § 22-30-3(21) (2015). 310 Ibid. 311 W. VA. CODE § 22-30-9 (2015); WVDEP. Spill Prevention Response Plan Guidelines for ASTs. http://www.dep.wv.gov/WWE/abovegroundstoragetanks/Pages/SpillPreventionResponsePlanRequirements.aspx (August 2, 2016). 312 If a person is in violation of the code WVDEP may issue an order and require compliance or commence a civil action. A person who fails to comply with an order may be liable for up to $25,000 per day of noncompliance. Further, any person who intentionally violates any provision of the article, or any rule or order issued, is guilty of a misdemeanor and may be confined in a regional jail for up to one year and be fined up to $25,000. W. VA. CODE § 22-30-16 to -17 (2015). 313 W. VA. CODE § 22-30-9(d) (2015). 314 Ibid.

Freedom Industries, Inc. Investigation Report May 2017

90

WVDEP has been conducting routine inspections of ASTs since the AST Act effective date and has completed 1,514 AST inspections as of August 30, 2016. Most of WVDEP’s AST Inspection staff has been trained and certified as Steel Tank Institute (STI) inspectors and have also received SPCC training.315 WVDEP plans to hire additional inspectors over the next few years to meet the goals of the AST program. WVDEP inspections include a review of all facility AST records, a review of the spill plan and an onsite inspection, as well as any action that may be deemed necessary to protect the state’s waters and public health. WVDEP may also conduct non-routine inspections if something prompts it to conduct an inspection early.

In addition to WVDEP inspections, tank owners or operators must ensure each regulated tank and its associated secondary containment structure is evaluated and certified by a qualified person.316 Qualified persons consist of professional engineers or a qualified person working under the direct supervision of a professional engineer, or an individual certified by API or STI to perform tank inspections.317 Once this evaluation is complete, every owner and operator must submit a certification, signed by a qualifying person, documenting whether the tank and structure meet standards established in accordance with the rest of the AST Act. When this regulation became effective, WVDEP issued interpretative rule 47-62318 outlining the requirements regulated tank owners must comply with and also providing an Interim Inspection Checklist for Initial AST Inspection.319

In part, this Interim Inspection Checklist required qualified persons to determine whether the AST was on a proper foundation and whether it was compatible with the materials stored, and to examine the tank system’s exterior surfaces for flaws, deterioration or corrosion. In addition to the holes corroded through the floor of tank 396, signs of deterioration and corrosion were visible on the exterior of the tank that would have been noted as a deficiency in tank integrity. The poor condition of the wall would have also been easily identifiable through a visual inspection. Formal tank certifications are now required to be conducted once every three years for Level 1 tanks and every five years for Level 2 tanks. However, in the intervening years the tank owner or operator must inspect the AST and certify no changes have occurred to the system. Additionally, for Level 1 tanks, the AST Rule requires a monthly evaluation of the tank and an evaluation of the secondary containment structure every 14 days.320 The deficient secondary containment at Freedom would have been an obvious problem during these evaluations requiring notification to WVDEP.

315 The AST program is currently growing and as a result training is continuous. 316 W. VA. CODE § 22-30-6 (2015). 317 Ibid. 318 W. VA. CODE R. § 47-62 (2014). 319 WVDEP. Interim Inspection Checklist. http://www.dep.wv.gov/WWE/abovegroundstoragetanks/Documents/InterimInspectionChecklistforOwnerOperat orAnnualASTInspection.pdf (August 2, 2016). W. VA. CODE R. § 47-62 (2014) has been superseded by final rule W. VA. CODE R. § 47-63 (2016) effective August 1, 2016; however, owners or operators who completed an inspection under 47-62 will be in compliance with 47-63 until the next owner certified inspection is required to be completed before January 1, 2018. 320 W. VA. CODE R. § 47-63-10.2.G.1 (2016).

Freedom Industries, Inc. Investigation Report May 2017

91

As described in Section 3 of this report, Freedom did not employ, nor was it required to employ, any leak detection system for the tanks located at the site. Section 10.3 of the Rule explicitly requires the owner to ensure that regulated AST systems are monitored for leak detection at least once per calendar month, using a method or combination of methods that are capable of detecting a release from any portion of the AST. The leak detection method must be installed and operated in accordance with applicable manufacturer’s specifications including routine maintenance.321 The owner must ensure that the area beneath the tank bottom is monitored for leakage by visual, mechanical or electronic leak detection methods.322 Visual testing is an acceptable form of leak detection for regulated ASTs so long as the entire area of concern and its secondary containment is readily accessible for view and properly illuminated by natural or artificial light.323

CSB found that the poor condition of the secondary containment surrounding the tanks allowed tank contents to flow directly into the Elk River. Freedom was aware of the defective nature of the secondary containment prior to the incident and had even received an estimate to repair the structure. However, it did not perform any repairs prior to the incident. The secondary containment requirements in the Rule address these issues. All regulated ASTs must have a secondary containment system that collects and contains an unintentional release from an AST and its ancillary equipment up to the first point of isolation.324 Further, all secondary containment must be compatible with all substance(s) stored within the containment structure.325 Owners would be required to maintain secondary containment in accordance with nationally recognized standards. Additionally, the Rule places the burden on the owner to notify WVDEP and take immediate action to remove substances from the AST systems if secondary containment for a Level 1 AST is found to be defective and the structure is not repairable within 72 hours.326 This provision could be a valuable tool in achieving compliance.

Freedom did not have any records of previously performed internal tank inspections of tank 396 and other tanks containing mixtures of Crude MCHM and other chemicals; had inspections been conducted, evidence of corrosion would have been obvious. If Freedom had conducted internal inspections, the extent of corrosion would have been clear in tanks 395, 396 and 397. The Rule sets forth requirements for formal internal inspections on existing tanks to be performed in accordance with the requirements of STI SP001327 and API 653.328 These inspections would need to include, among other things, evaluation of tank-bottom integrity and shell thickness. The Rule also calls for internal inspections of new tanks with a capacity of 30,000 gallons or greater to be conducted at least once every 20 years for tanks without a Release Prevention Barrier and 30 years for tanks with a Release Prevention Barrier.329 Additionally, all regulated tanks that have not had prior internal inspections must have one performed within 1 to 3 years,

321 W. VA. CODE R. § 47-63-10.3.a (2016). 322 W. VA. CODE R. § 47-63-10.3.b (2016). 323 W. VA. CODE R. § 47- 63-10.3.c (2016). 324 W. VA. CODE R. § 47-63-10.2.a (2016). 325 W. VA. CODE R. § 47-63-10.2.b (2016). 326 W. VA. CODE R. § 47-63-10.2.g.1 (2016). 327 STI SP001, like API 653, is a nationally recognized standard for Inspection of Aboveground Storage Tanks. 328 W. VA. CODE R. § 47-63-5.3.a (2016). 329 W. VA. CODE R. § 47-63-5.3.b (2016).

Freedom Industries, Inc. Investigation Report May 2017

92

depending on the age of the tank. If these inspections determine tanks to be not fit for service, then they must immediately be emptied and removed from service. Once a tank has been removed from service due to an internal inspection, the Rule goes on to require upgrade or permanent closure of that tank.330

The Freedom incident could have been prevented had proper maintenance and corrosion prevention been implemented at the facility. The Rule would require that tank owners ensure that all regulated ASTs are maintained with corrosion prevention measures that are necessary to prevent releases.331 Acceptable methods of corrosion prevention include cathodic protection systems, external and internal coatings, internal tank liners, or certain storage practices or construction with a noncorrodible material coating. These methods are consistent with best practices, guidelines and industrial standards that, if followed, would help prevent corrosion and tank failure.332

CSB also found that WVAW asserted it was unaware that Freedom stored Crude MCHM and other chemicals upstream of the Elk River intake prior to the incident. The AST Act attempts to address the lack of communication between tank operators and water companies by requiring owners of regulated tanks to provide notice directly to the public water system of the type and quantity of fluid stored in the regulated tanks and the location of SDSs.333 Owners are also required to provide notice to state, county and municipal emergency response organizations. In lieu of providing this information, owners of regulated tanks may opt to provide Tier II334 sheets directly to the public water system.335

Finally, the Rule also lays out reporting and recordkeeping requirements336 and also provides WVDEP with the authority to take corrective action.337 The Rule provides for strict AST Design, Construction and Installation requirements for newly constructed ASTs. Notably, any new Level 1 ASTs installed after the effective date of the Rule would be required to be double walled, double bottomed or placed on a Release Prevention Barrier.338 Additionally, newly constructed ASTs must be designed and constructed according to the most recent industry standards and owners must keep baseline data that includes, but is not limited to, shell thickness and material certifications.

The AST Act and Rule have addressed many of the gaps and deficiencies identified by CSB in the course of the Freedom investigation. With the passage of the Rule, WVDEP is now equipped with the

330 W. VA. CODE R. § 47-63-5.3.g (2016). 331 W. VA. CODE R. § 47-63-9.1 (2016). 332 See Section 3 of this report. 333 W. VA. CODE § 22-30-10 (2015). 334 A Tier II form is submitted the Local Emergency Planning Committee as required by Section 312 of EPCRA. It must include (1) the chemical name or the common name indicated on the SDS, (2) an estimate (in ranges) of the maximum amount of the chemical present at any time during the preceding calendar year and the average daily amount, (3) a brief description of the chemical’s manner of storage, (4) the location of the chemical at the facility, and (5) an indication of whether the owner elects to withhold location information from public disclosure. For a full analysis of EPCRA, see Section 5.5.1 335 W. VA. CODE § 22-30-10 (2015). 336 W. VA. CODE R. § 47-63-6 (2016). 337 W. VA. CODE R. § 47-63-7 (2016). 338 W. VA. CODE R. § 47-63-8.2.i (2016).

Freedom Industries, Inc. Investigation Report May 2017

93

appropriate authority and tools to carry out the requirements of the statute to ensure the prevention of similar incidents in West Virginia. 5.3 Clean Water Act Although the incident at Freedom resulted in an air release, as evidenced by multiple odor complaints, the incident necessitates a review of the CWA because tank contents were released into the Elk River. The CWA establishes the basic structure for regulating discharges of pollutants into waters of the United States and regulating quality standards for surface waters.339 The objective of the CWA is to restore and maintain the chemical, physical and biological integrity of the nation’s waters.340 It is administered by EPA in coordination with state and tribal governments.341 Under the CWA, EPA has implemented a number of pollution control programs, including the NPDES program. Because it is pertinent to this investigation, the NPDES program will be discussed in further detail below. 5.3.1 National Pollutant Discharge Elimination System Program The NPDES program is the primary program associated with water pollution control in the United States. Under this program, it is unlawful for a person to discharge any pollutant from a point source into waters of the United States unless an NPDES permit is first obtained.342 Violations may result in fines and/or imprisonment. Freedom violated the CWA by discharging a pollutant, MCHM, from point sources into the Elk River, a water of the United States, without a permit authorizing such discharge.343 Freedom also violated certain pollution prevention requirements set forth in a general NPDES permit it obtained related to stormwater. Because the violation of these requirements likely played a role in the incident, this topic is addressed in greater detail below and in Appendix B.

An NPDES permit is typically a license for a facility to discharge a specified amount of a pollutant into a receiving water under certain conditions.344 There are two basic types of NPDES permits: individual and general.345 An NPDES individual permit is written to reflect site-specific conditions of a single discharger based on information submitted by that discharger in a permit application and is unique to that discharger, whereas an NPDES general permit is written to cover multiple dischargers with similar operations and types of discharges based on the limits and conditions established by national Effluent Limitations Guidelines, or in the absence of the national guidelines, the best professional judgement of the permit writer.346 A general permit is not issued to one particular entity; instead, multiple dischargers obtain

339 http://www2.epa.gov/laws-regulations/summary-clean-water-act. The CWA is located at 33 U.S.C. §§ 1251-1387 (1972). Its implementing regulations are codified at 40 C.F.R. §§ 100-149, 400-471, 500-503 (2016). 340 33 U.S.C. § 1251(a) (1972). 341 http://www2.epa.gov/laws-regulations/summary-clean-water-act. The CWA does not focus directly on groundwater contamination. Groundwater is addressed in Section 5.4 of this report, 42 U.S.C. § 300f (1974), 42 U.S.C. §§ 6901-6992k (1976), and 42 U.S.C. §§ 9601-9675 (1980). 342 33 U.S.C. § 1342 (1972). http://www2.epa.gov/laws-regulations/summary-clean-water-act. 343 https://www.justice.gov/usao-sdwv/pr/freedom-industries-and-former-freedom-industries-plant-manager- sentenced-roles-chemical. 344 http://www.epa.gov/npdes/about-npdes#types. 345 http://www.epa.gov/npdes/about-npdes#types. 346 http://www.epa.gov/npdes/npdes-frequent-questions.

Freedom Industries, Inc. Investigation Report May 2017

94

coverage under that general permit after it is issued.347 As such, dischargers covered under general permits know their applicable requirements before obtaining coverage under that permit.348 In addition, permits include limits as necessary to ensure that state Water Quality Standards are protected.

Freedom possessed a General WV/NPDES Water Pollution Control Permit for stormwater discharges from the WVDEP on the day of the incident.349 This permit was issued on April 1, 2009, and expired on March 31, 2014.350 An important requirement of the General WV/NPDES Water Pollution Control Permit for stormwater discharges is that certain pollution prevention plans must be developed. As set forth in the permit, each covered facility must have an SWPPP and a GPP.351 SWPPPs must be prepared in accordance with good engineering practices.352 They must identify potential sources of pollution that may reasonably be expected to affect the quality of stormwater discharges associated with industrial activity from the facility.353 In addition, they must describe and ensure the implementation of practices that are to be used to reduce the pollutants in industrial-related stormwater discharges at the facility.354 GPPs include similar types of requirements for groundwater.355

All facilities must submit a copy of the SWPPP and GPP with their application for review.356 Although CSB did not find evidence of a GPP, it did find a SWPPP. This SWPPP was drafted by a third-party engineering firm for ERT on February 14, 2002. It assessed the potential pollutant sources and identified best management practices at the facility as well as procedures for implementing the plan and for evaluating and monitoring the effectiveness of the plan. Details regarding good housekeeping, preventive maintenance, visual inspections, spill prevention and response, sediment erosion and control, and management of runoff were all included. The plan was to be kept at the facility and reviewed and updated regularly. CSB did not find this to be the case, however, as no SWPPP subsequent to February 14, 2002, could be located. At the time of the incident, renewal of the permit did not require submission of the plans to WVDEP; rather, the SWPPP and GPP were required only to be maintained onsite. SWPPPs and GPPs are now required to be submitted during permit renewals.

347 http://www.epa.gov/npdes/npdes-frequent-questions. 348 http://www.epa.gov/npdes/npdes-frequent-questions. 349 Under the CWA, EPA authorizes the NPDES permit program to state, tribal and territorial governments, enabling them to perform many of the permitting, administrative and enforcement aspects of the NPDES program. In states authorized to implement CWA programs, EPA retains oversight responsibilities. The State of West Virginia is authorized to implement the NPDES program, and does so through the WVDEP Division of Water and Waste Management. 350 WV/NPDES. Multi-Sector General Water Pollution Control Permit. Permit No. WV0111457. Section B, 17. 2009. 351 Ibid. 352 Ibid. 353 Ibid. In WVDEP’s Generic SWPPP, a description of potential pollutant sources includes the loading and unloading of dry bulk materials and liquids, outdoor material storage, outdoor process activities, dust generating activities, illicit connections, and management practices and waste disposal practices. 354 WV/NPDES. Multi-Sector General Water Pollution Control Permit. Permit No. WV0111457. Section B, 17. 2009. 355 Ibid. 356 Ibid.

Freedom Industries, Inc. Investigation Report May 2017

95

SWPPPs also require annual site inspections, to be conducted by appropriate personnel named in the plan.357 This inspection requires verification that (1) the description of potential pollutant sources is accurate, (2) the drainage map has been updated or otherwise modified to reflect current conditions, and (3) the controls used to reduce pollutants in stormwater discharges associated with industrial activity identified in the plan are being implemented and are adequate.358 GPPs must include provisions for quarterly inspections of the facility to ensure that all elements and equipment of the groundwater protection programs are in place, functioning properly and managed appropriately.359 Considering the degraded nature of the site that clearly took years to unfold, CSB determined that neither Freedom nor ERT implemented a SWPPP or GPP in the more recent years leading up to the incident.

Furthermore, the General WV/NPDES Water Pollution Control Permit requires visual inspections that are separate and distinct from the site inspections mentioned above.360 Under this requirement, the permittee must identify qualified company personnel to inspect designated equipment and plant or other appropriate areas.361 To the extent that the 2002 SWPPP was over a decade old, it is unlikely that the personnel identified to conduct such inspections were up-to-date at the time of the incident. The visual inspection requirement also states, “Material handling areas must be inspected for evidence of, or the potential for, pollutants entering the drainage system. A tracking or follow-up procedure should be used to ensure that adequate response and corrective actions have been taken in response to the inspection. Records of inspections shall be maintained.”362 ASTs and tank farms are clearly “material handling areas.” CSB found no evidence of repairs (demonstrated at least in part by the poor condition of the site) and no documentation of a regular inspection program at Freedom.

Freedom’s failure to develop, maintain and implement a SWPPP and GPP as required by its General WV/NPDES Water Pollution Control Permit for stormwater discharges resulted in Freedom’s failure to analyze the spill potential of all substances stored at its facility, maintain the containment area that was supposed to prevent a chemical spill from reaching the Elk River, inspect and maintain its storage tanks, and train all personnel to ensure that they were aware of, and in compliance with, environmental laws, including the requirements of SWPPPs and GPPs.363

As set forth above, the implementation of a SWPPP and GPP could have helped prevent the leak and spill of the mixture containing Crude MCHM and PPH, stripped into the Elk River that occurred on the day of the incident. In analyzing possible regulatory gaps, CSB determined that WVDEP could have put Freedom on notice of its noncompliance with the pollution protection requirements of its permit had

357 Ibid. 358 Ibid. 359 Ibid. 360 WV/NPDES. Multi-Sector General Water Pollution Control Permit. Permit No. WV0111457. Section B, 17.

  1. Although the visual inspections requirement does not set forth the frequency with which visual inspections

must be conducted, the use of the plural language in the title of this section suggests more than once. 361 WV/NPDES. Multi-Sector General Water Pollution Control Permit. Permit No. WV0111457. Section B, 17. 2009. 362 Ibid. 363 https://www.justice.gov/usao-sdwv/pr/freedom-industries-and-former-freedom-industries-plant-manager- sentenced-roles-chemical.

Freedom Industries, Inc. Investigation Report May 2017

96

WVDEP inspected the facility. Although there was no requirement for WVDEP to do so at the time of the incident, WVDEP will conduct increased inspections for pollution prevention practices at facilities like Freedom in accordance with the new AST Act. 5.4 Safe Drinking Water Act Congress passed the Safe Drinking Water Act in 1974 to help protect public health by regulating the nation’s public drinking water supply.364 Originally, the SDWA focused primarily on treatment as the means of providing safe drinking water at the tap.365 However, with amendments in 1986 and 1996, the SDWA began to concentrate more on protection, thereby helping ensure the quality of public drinking water preceding the tap, from the source.366 In particular, the 1996 amendments enhanced the existing law by, for example, recognizing source water protection as an important component of safe drinking water.367 EPA implemented this part of the SDWA through its Source Water Assessment Program (SWAP). Because it pertains to this investigation, SWAP will be discussed in further detail below. 5.4.1 Source Water Assessment Program The 1996 amendments to the SDWA provided a planning process that required every state to conduct an assessment of its drinking water sources to identify significant potential sources of contamination and determine how susceptible the sources were to these threats.368 This was achieved under SWAP, which required states to conduct assessments of public water systems to see where they might be vulnerable to contamination.369 Each SWAP was required to include the following four elements: (1) delineating (or mapping) the source water protection areas, (2) conducting an inventory of potential sources of contamination in those areas, (3) determining the susceptibility of public water systems to those contamination sources, and (4) releasing the results of the determinations to the public.370

After a state’s SWAP was approved by EPA, the state had two years, with a possible 18-month extension, to conduct an assessment for each public water system and make these assessments available to the public.371 States were required to complete all assessments in the state no later than three years after EPA approved the programs.372 The assessments, commonly called Source Water Assessment Reports (SWARs), covered public water systems in major metropolitan areas, small towns, schools, restaurants and other public facilities that had a well or surface water supply.373 It is important to note that although SWAP is an active EPA program, the SDWA did not require it to be ongoing. Because the assessments were not required to be updated, many states’ one-time SWARs were conducted in the early 2000s. This

364 EPA. Understanding the Safe Drinking Water Act. https://www.epa.gov/sites/production/files/2015- 04/documents/epa816f04030.pdf (February 7, 2017). 365 Ibid. 366 Ibid. 367 Ibid. 368 Ibid. 369 Ibid. 370 EPA Office of Water. Safe Drinking Water Act: Protecting Drinking Water Sources. EPA: Washington, DC. June 2004. 371 Ibid. 372 Ibid. 373 Ibid.

Freedom Industries, Inc. Investigation Report May 2017

97

has recently changed in West Virginia, though, where SWAP has been reinvigorated and enhanced. A discussion of this recent change is included at the end of this section.

In 1997, the Governor of West Virginia assigned the Environmental Engineering Division of the Office of Environmental Health Services (OEHS), WVDHHR as the lead agency responsible for the development and implementation of the state’s SWAP. By the early 2000s, the OEHS Source Water Protection Unit completed all of the state’s SWARs, including that for WVAW KVTP, a community water system, in

  1. In this SWAR, WVAW received a susceptibility ranking of “high” (Figure 37).

Figure 37. WVAW–KVTP susceptibility ranking. (Source: WVAW) The SWAR also included an inventory of Potential Significant Contaminant Sources. It identified approximately 80 Potential Significant Sources of Contamination within the ZCC for WVAW KVTP. The detailed inventory included the Etowah Terminal, where Freedom Industries would later be located and where the incident would occur.

Although the SWAR recommended that a SWAP protection plan be prepared to account for the high susceptibility ranking, the plan was not required. This plan, if developed, was recommended to incorporate the SWAR and three additional sections: (1) Contingency Planning, (2) Alternative Sources, and (3) Management Planning.374 According to West Virginia’s Source Water Assessment and Protection

374 West Virginia Department of Health and Human Resources Bureau for Public Health Office of Environmental Health Services Source Water Protection Unit. State of West Virginia Source Water Assessment and Protection Program: Source Water Assessment Report. State of West Virginia: West Virginia, WVAWC- Kanawha Valley. July 29, 2002.

Freedom Industries, Inc. Investigation Report May 2017

98

Program, “local source water protection programs should utilize the source water assessments from OEHS and build their programs to include a local source water protection committee or team, develop a management plan for the contaminant sources identified, and develop a contingency or emergency plan.”375 This voluntary language aligned with the federal mandate because, although the SDWA Amendments of 1996 intended to encourage states and public water supplies to go beyond source water assessments and implement efforts to manage identified sources of contamination in a manner that would protect public drinking water sources, it only required states to develop EPA-approved SWAPs.376 CSB found that WVAW started conducting interviews with commercial entities of concern in 2006 as part of its voluntarily developed SWAP protection plan.377 Despite also completing an associated emergency response plan, WVAW never finished conducting those interviews.378 CSB did not find evidence indicating that WVAW surveyed the Freedom site to assess the risk of potential spills into the Elk River.379

Nonetheless, efforts to require state-level source water protection planning did succeed post-incident. As previously discussed in Section 5.2.2, SB 373 revised portions of Article 1 of Chapter 16 (Public Health) of the West Virginia Code to address regulation of public water systems, source water protection, grants for wellhead and source water protection, and long-term medical monitoring.380 Key components of these revisions were approved by the 2014 Legislature and signed into law by Governor Earl Ray Tomblin on April 1, 2014.381 The law became effective on June 6, 2014.382 The new section required public water utilities to submit source water protection plans to WVBPH by July 1, 2016.383 Going beyond components from the 2002 SWAR, requirements for source water protection plans must include the following: (1) a contingency plan, (2) a management plan, (3) a communication plan, (4) a list of potential sources of significant contamination (provided by WVDEP, WVBPH and Homeland Security), (5) an analysis of whether the utilities’ water systems can shut intakes or otherwise have the capability for alternate water sources in the event of an emergency, and (6) an evaluation of the feasibility of implementing an early warning monitoring system.384 CSB found these requirements exceed many of the

375 West Virginia Department of Health and Human Resources Bureau for Public Health Office of Environmental Health Services Environmental Engineering Division. State of West Virginia Source Water Assessment and Protection Program; State of West Virginia: West Virginia, Aug 1, 1999 (emphasis added). 376 West Virginia Department of Health and Human Resources Bureau for Public Health Office of Environmental Health Services Environmental Engineering Division. State of West Virginia Source Water Assessment and Protection Program; State of West Virginia: West Virginia, Aug 1, 1999. 377 WVAW Kanawha Valley District. Source Water Assessment and Pollution Prevention Plan and Activities for the Central Division. Prepared September 7, 2006. 378 Ibid. 379 Water utilities have expressed concern with respect to accessing information this way because the utilities do not have the authority to compel third party businesses to grant them access to their sites or to provide information about stored chemicals (e.g., chemical contents may be claimed as proprietary). 380 https://www.wvdhhr.org/oehs/eed/swap/Bill.asp. 381 Ibid. 382 Ibid. 383 https://www.wvdhhr.org/oehs/eed/swap/Bill_FAQ.asp. A “public water utility” is defined as a public water system regulated by the state Public Service Commission pursuant to Chapter 24 of the state code. 384 https://www.wvdhhr.org/oehs/eed/swap/Bill_FAQ.asp.

Freedom Industries, Inc. Investigation Report May 2017

99

federal SWAP requirements. WVAW KVTP submitted the public version of its source water protection plan to WVBPH in June 2016. 5.5 Emergency Planning

The Freedom incident demonstrates not only the lack of information available on certain hazardous chemicals but also the need for planning relating to the release of chemicals that are not considered to be “hazardous substances” or “extremely hazardous substances.” For facilities that store large amounts of hazardous chemicals within close proximity to major water sources, the need for a well-rehearsed emergency plan that includes prior communication of the chemicals to the water utility company is vital. EPCRA provides states and local emergency responders the tools to plan for situations like the Freedom spill, but the information available to these parties through the statute was not used to create a detailed response plan relating to the release of such a large amount of hazardous chemicals into the Elk River. Water utilities are also able to request chemical information submitted pursuant to EPCRA to properly plan for source water contamination from chemicals located in close proximity to intakes.

Although the information submitted under EPCRA is useful in planning activities, West Virginia has also attempted to address this planning issue under the AST Act, which requires certain information to be submitted directly to water utility companies (see Section 5.2.2). The following sections, however, discuss applicable sections of EPCRA, how they applied to the facility and the LEPC’s planning activities prior to and following the incident. 5.5.1 Emergency Planning and Community Right-to-Know Act EPCRA is a statute that was created to address emergency response and preparedness.385 “EPCRA established a national framework for EPA to mobilize local government officials, businesses and other citizens to plan ahead for possible chemical accidents in their communities.”386 EPCRA is divided into four main categories: (1) emergency planning (§§ 301-303), (2) emergency release notification (§ 304), (3) hazardous chemical inventory reporting (§§ 311-312), and (4) toxic chemical release reporting (§ 313). The chemicals, which are covered by each section of EPCRA, are different, as are the quantities that trigger reporting (see Table 10).387

385 EPCRA was passed by Congress in 1986 in response to concerns highlighted by a toxic chemical release from a Union Carbide chemical plant in Bhopal, India, that killed thousands and which was shortly followed by a similar incident in Institute, West Virginia. EPA. The Emergency Planning and Community Right-to-Know Act. https://www.epa.gov/sites/production/files/2015-05/documents/epcra_fact_sheet.pdf (August 31, 2016). 386 CRS Report RL30798. Environmental Laws: Summaries of Major Statutes Administered by the Environmental Protection Agency. Congressional Research Service, Washington, DC. 2010. 387 EPA. EPCRA Fact Sheet. http://www2.epa.gov/sites/production/files/2013-08/documents/epcra_fact_sheet.pdf (August 31, 2016).

Freedom Industries, Inc. Investigation Report May 2017

100

Table 10. EPCRA Chemicals and Reporting Thresholds (Source: EPA) Section Number 303 304 311/312 313 Chemicals Covered 355 Extremely Hazardous Substances

1,000

substances Approximately 500,000 hazardous chemicals

650 Toxic Chemicals

and categories Thresholds Threshold Planning Quantity 1- 10,000 lbs onsite at any one time Reportable quantity, 1- 5,000 lbs, released in a 24-hour period 500 lbs or Threshold Planning Quantity, whichever is less for Extremely Hazardous Substances; 75,000 gallons for gasoline; 100,000 gallons for diesel; and 10,000 lbs for all other hazardous chemicals 25,000 lbs per year manufactured or processed; 10,000 lbs per year otherwise used; persistent bioaccumulative toxics have lower thresholds

Under Section 301 of EPCRA, each state is required to create a State Emergency Response Commission (SERC) composed of individuals with expertise in the emergency response field.388 Section 301 also requires each SERC to define emergency planning districts and to establish LEPCs for each district.389 “The SERC supervises and coordinates the activities of the LEPC, establishes procedures for receiving and processing public requests for information collected under EPCRA, and reviews local emergency response plans.”390 The LEPCs are composed of local government, law enforcement, owners and operators of facilities subject to EPCRA, as well as individuals from other disciplines.391

LEPCs are required to prepare comprehensive local emergency response plans under Section 303 based on the reported chemical information from facilities.392 These emergency plans, however, are only required to include facilities that have listed extremely hazardous substances (EHSs) present onsite in excess of the applicable threshold planning quantity (TPQ). EPA maintains a list of EHSs and the TPQ for each listed substance. Currently, 355 EHSs are listed in EPA’s database.393 Neither Crude MCHM nor PPH, stripped is an EHS; thus, they are not regulated under Section 304 and are not required to be

388 42 U.S.C. § 11001 (1986). 389 Ibid. 390 EPA. EPCRA Fact Sheet. http://www2.epa.gov/sites/production/files/2013-08/documents/epcra_fact_sheet.pdf (August 31, 2016). 391 EPCRA § 301 requires that each LEPC be composed of representatives of the following: elected state and local officials, law enforcement officials, civil defense personnel, firefighters, first aid personnel, health personnel, local environmental personnel, members of the broadcast and print media, community groups, and owners and operators of facilities covered by EPCRA § 301(c); 42 U.S.C. § 11001 (1986). 392 42 U.S.C. § 11003 (1986). 393 EPA. EPCRA Fact Sheet. http://www2.epa.gov/sites/production/files/2013-08/documents/epcra_fact_sheet.pdf (August 31, 2016).

Freedom Industries, Inc. Investigation Report May 2017

101

included in comprehensive emergency planning. EPCRA did, however, provide Governors of each state and the SERC the power to designate additional facilities to be subject to these requirements.394 Additionally, LEPCs have the option to include in the comprehensive plan any facility from which they receive chemical information.

Section 304 of EPCRA requires owners or operators of certain facilities to report hazardous substance releases immediately to SERCs and LEPCs.395 Crude MCHM and PPH, stripped are hazardous chemicals under OSHA; however, neither chemical is considered a hazardous substance under the Comprehensive Environmental Response, Compensation, and Liability Act, nor are they EHSs.

EPCRA also requires facilities with hazardous chemicals, as defined by the Occupational Safety and Health Act, to report their inventory under Sections 311 and 312. The requirements of EPCRA Sections 311 and 312 are closely intertwined with OSHA’s HCS. Sections 311 and 312 of the statute use the framework of the HCS to give the public and local emergency responders information regarding the presence of hazardous chemicals in the community.396 As such, these sections use OSHA’s definition of hazardous chemical, and cover a much greater set of chemicals than other portions of EPCRA. Approximately 500,000 products are required to have SDSs and are considered hazardous chemicals. Facilities subject to Sections 311 and 312 are those required by OSHA to keep SDSs on file, and where one or more of the chemicals is stored in quantities equal to or greater than the TPQ for that chemical. For many hazardous chemicals, including Crude MCHM and PPH, stripped, the TPQ is 10,000 pounds.397 Freedom had more than 10,000 pounds of Crude MCHM at its facility; therefore, Freedom was required to comply with Sections 311 and 312 of EPCRA.

Under Section 311, facilities that are required to prepare or have available an SDS for a hazardous chemical must submit an SDS for each such chemical or, in the alternative, a list of such chemicals, if the amount of the chemical equals or exceeds threshold amounts.398 This submission must be made to the SERC, LEPC and fire department with jurisdiction over the facility. Although SDS reporting is not required, if a facility chooses to submit a list, then the LEPC has the authority to request an SDS for any chemical on that list.399 Additionally, the LEPC is also authorized to request an SDS for any hazardous chemical regardless of the quantity of the hazardous chemical at the facility.400

Section 312 requires facilities subject to Section 311 reporting requirements to provide additional information regarding hazardous chemicals. These facilities must annually prepare and submit, to the same local authorities, an emergency and hazardous chemical inventory form. Facilities fulfill this requirement by providing either a Tier I or Tier II inventory form. In most states, including West Virginia,

394 42 U.S.C. § 11002(a) (1986). 395 42 U.S.C. § 11004 (1986). 396 42 U.S.C. §§ 11021-11022 (1986). 397 40 C.F.R. § 370.10 (2012). 398 42 U.S.C. § 11021 (1986). 399 40 C.F.R. § 370.30(b) (2012). 400 40 C.F.R. § 370.21(d) (2012).

Freedom Industries, Inc. Investigation Report May 2017

102

compliance with EPCRA Section 312 is fulfilled by submitting annually a Tier II form.401 A Tier II form must include (1) the chemical name or the common name indicated on the SDS, (2) an estimate (in ranges) of the maximum amount of the chemical present at any time during the preceding calendar year and the average daily amount, (3) a brief description of the chemical’s manner of storage, (4) the location of the chemical at the facility and (5) an indication of whether the owner elects to withhold location information from public disclosure.402 5.5.2 Emergency Planning in West Virginia EPCRA expressly states that the statute does not preempt any state law, which means states may impose stricter requirements. West Virginia’s statute, however, implements the requirements under EPCRA via the West Virginia State Emergency Act Chapter 15, Article 5, which simply mirrors the federal requirements.403 This statute created the West Virginia State Emergency Response Commission. Under the commission’s authority, West Virginia’s Superfund Amendments and Reauthorization Act Program receives and manages state-level EPCRA reports. This statute also established the various LEPCs required under EPCRA.

In West Virginia, the LEPCs were established along existing county lines. The Kanawha Putnam Emergency Planning Committee covers the Charleston area, where Freedom was located, as well as the rest of Kanawha County and Putnam County. 5.5.2.1 Kanawha Putnam Emergency Planning Committee The KPEPC consists of 15 Board Members and about 120 members, and includes ten annex committees. It is funded through member contributions and small federal and state grants. The KPEPC includes representatives from law enforcement, fire departments, emergency medical services, environmental groups, hospitals, industrial facilities and local communities. The KPEPC is responsible for emergency planning and processing of public information requests associated with the use and transport of chemicals in the area. The KPEPC’s major activities include response planning, conducting emergency drills and functioning as an information source on chemicals for the community. Additionally, after a chemical spill or emergency response, the KPEPC has a subcommittee that completes an AAR to “identify actions taken and to identify strengths to be maintained and built upon, identify potential areas for further improvement, and support implementation of corrective actions.”404 5.5.2.2 Tier II Submissions Made by Etowah River, LLC As stated above, Freedom was subject to Section 311 and 312 reporting requirements given that Crude MCHM is considered a hazardous chemical under the HCS. Like most states, compliance with these requirements in West Virginia is fulfilled through the submission of a Tier II Emergency and Hazardous Chemical Inventory Form for the applicable chemicals within 90 days of exceeding the threshold for that

401 WVDHSEM. Tier II Reporting. http://www.dhsem.wv.gov/SERCTIERII/Pages/Tier-II-Reporting-.aspx (August 2, 2016). 402 40 C.F.R. § 370.42(s) (2012). 403 W. VA. CODE § 15-5A (2015). 404 Kanawha Putnam Emergency Planning Committee. West Virginia American Water Incident. After Action Report. 2014.

Freedom Industries, Inc. Investigation Report May 2017

103

chemical. In West Virginia, Tier II forms are required to include the chemical name as indicated on the SDS, an estimate in ranges of the maximum amount of the chemical present at any time during the preceding calendar year and the average daily amount, a brief description of the hazards and manner of storage, and the location of the chemical at the facility.405

ERT, Freedom’s predecessor, had submitted these Tier II forms. These forms are backward-looking and are used to report information on chemicals at the facility in the previous year. As such, 2012 is the most recent year for which a Tier II has been submitted since, at the time of the accident, the 2013 calendar year had recently ended and Freedom was not yet required to submit its Tier II for that year. All six of the Tier II forms filed by ERT listed Crude MCHM as being an “immediate (acute) physical and health hazard.” The forms also stated that the maximum daily amount onsite and the average daily amount onsite was between 100,000 and 999,999 pounds. These forms reported large quantities of hazardous chemicals located next to the area’s only source of drinking water and therefore should have been used in planning for such an incident. 5.5.2.3 Kanawha Putnam Emergency Management Plan The Kanawha Putnam Emergency Management Plan provides “general guidelines for planning, managing and coordinating the overall response and recovery activities of local government before, during and after major emergencies and disaster that affects [the] community.”406 The plan consists of a “Basic Plan” and two annexes. The “Functional” annex contains guidelines for participating agencies to use in developing agency-specific operating documents. The “Hazards” annex contains non-routine emergency scenarios. The Basic Plan and annexes provide general guidelines for planning and managing specific scenarios, but the plan deals mainly with setting up incident command and providing guidelines for communication at the time of the emergency. For this reason, EPCRA requires LEPCs to include a detailed response plan for certain facilities and provides LEPCs with the opportunity to include other facilities as they see fit. These detailed response plans are not available on the KPEPC website and the KPEPC did not have one completed for Freedom because it was neither a production facility nor a facility that stored extremely hazardous substances.

LEPCs are not required to create a detailed response plan for facilities that only store hazardous chemicals; however, LEPCs do have the authority to include these facilities in the emergency plan. Despite the availability of Tier II forms that included information about the amount and location of hazardous chemicals stored at the site, the response from officials and emergency agencies on January 9, 2014, and in the weeks following showed they were unaware of the hazards associated with storing Crude MCHM and other chemicals so close upstream from the area’s only water intake.

Each emergency plan the LEPC creates must include certain minimum requirements, as described above. One of these requirements is to identify other facilities that may be subjected to additional risk because of proximity to facilities subject to emergency planning requirements.407 If Freedom was a facility subject to

405 WVDHSEM. Tier II Reporting. http://www.dhsem.wv.gov/SERCTIERII/Pages/Tier-II-Reporting-.aspx (August 2, 2016). 406 KPEPC. Basic Plan. http://www.kpepc.org/shared/content/Page_objects/ahp_docs/Basic_Plan.pdf (August 5, 2016). 407 42 U.S.C. § 11003 (1986).

Freedom Industries, Inc. Investigation Report May 2017

104

EPCRA planning requirements or one that the KPEPC included in planning, the emergency response plan developed would have likely taken into account the location of the WVAW intake downstream and planned for a leak into the river. LEPCs should use the information from Tier I and Tier II documents to plan and minimize risks when facilities like water intake and treatment plants are within such close proximity. Further, states should support LEPC planners’ efforts, for instance by providing them with more resources to address similar issues and potential incidents.

As a result of the Freedom incident, West Virginia now requires owners of regulated tanks to provide notice directly to water companies of the type and quantities of fluid stored in regulated ASTs.408 Although this information may already be available to water companies by requesting it from the appropriate LEPC, West Virginia is taking a proactive approach to ensuring all water companies are fully aware of what is stored in close proximity to their intakes. Owners of regulated tanks can fulfill this requirement by submitting the same Tier II document directly to the water company. As stated earlier, CSB found that this information was available to WVAW if they requested it from the KPEPC.

Despite the planning requirements and the opportunity for the KPEPC to notify WVAW of the contents of the Freedom tanks, WVAW was not provided any notification about the Freedom tank contents. However, Tier II information submitted to SERCs and LEPCs is publicly available.409 Although not required by regulation, WVAW could have requested this information to determine what chemicals were being stored in close proximity to the only water intake. 5.5.2.4 After Action Report In addition to planning, the KPEPC also completes an AAR following an incident in the Kanawha/Putnam area. This report is created to provide supportive corrective actions in relation to the KPEPC Plan. The goal of the report is to identify actions taken, strengths and weaknesses, and potential areas for further improvement.

Through the AAR, the KPEPC identified a variety of scenarios that need to be planned for, including large-scale water outages and a complete system loss. The AAR also recommends that the KPEPC review the information collected under the AST Act and determine which tanks threaten public health and safety, in particular ones that could threaten drinking water sources.

On the day of the incident, the KPEPC was familiar with Crude MCHM due to prior incidents involving the chemical but did not have an SDS for the chemical. As a result of the Freedom incident, West Virginia implemented a more efficient way of managing Tier II reports. There is now an electronic management system that has geographical information system mapping capabilities to identify nearby hospitals, ZCCs, water intakes, highways, railroads and other potential concerns.410

408 W. VA. CODE § 22-30-10 (2015). 409 42 U.S.C. § 11022(e) (1986). 410 Governor Earl Ray Tomblin. After Action Review, State of West Virginia, January 9, 2015. http://www.governor.wv.gov/Documents/After%20Action%20Review.PDF (August 2, 2016).

Freedom Industries, Inc. Investigation Report May 2017

105

  1. 6 Chemical Regulation under the Toxic Substances Control Act

The Freedom incident highlighted the need for more information on the health effects of hazardous chemicals in the United States. The following provides an overview of the Toxic Substances Control Act (TSCA), which regulates chemicals in the United States. TSCA was recently amended to provide EPA with greater authority to regulate and test chemicals. The following first discusses relevant sections of the old statute and highlights some of the burdensome hurdles EPA had to clear to gather important information or to regulate chemicals. Section 5.6.2 then provides an overview of the major changes to TSCA as a result of the Frank R. Lautenberg Chemical Safety for the 21st Century Act.

TSCA was introduced to regulate chemicals before they became contaminants and to gather information on chemicals entering the environment. TSCA was enacted, after years of debate, to authorize EPA to collect information “about the hazards posed by chemical substances and to take action to control unreasonable risks by either preventing dangerous chemicals from making their way into use or placing restrictions on those already in commerce.”411 Although the statute seems to provide EPA with broad authority, TSCA contained serious flaws that severely limited EPA’s ability to gather information and regulate chemicals. 5.6.1 TSCA Prior to 2016 Some of TSCA’s deficiencies were highlighted by the Freedom incident. Eastman voluntarily conducted testing on Crude and 4-MCHM, however none of this testing was required under TSCA or any other law or regulation. These studies provided users and the public with warnings based on its acute toxicity; however because they were not required to do so, Eastman’s tests did not include studies at low doses that would have assisted public professionals in responding to the spill and communicating risks to the public.

Although only recently being sold as a commercial product by Eastman, Crude MCHM has long been produced as a co-product during Cyclohexane Dimethanol (CHDM) production. When TSCA was enacted, 4-MCHM, the main constituent of Crude MCHM, was already being produced and was “grandfathered” in along with some 55,000 other chemicals. Inclusion in this inventory is what distinguishes an “existing chemical” from a “new chemical.” A chemical substance cannot enter into commerce in the United States without first being placed on the inventory and in order to be considered for placement, new chemicals must comply with the new chemical requirements of Section 5. By placing the existing chemicals on the TSCA inventory, they were then, and continue to be, exempt from the EPA review required for new substances before they are sold on the market. Although EPA has instituted some programs under the old statute to review existing chemicals, 4-MCHM was not among the substances reviewed.

TSCA’s coverage was intended to be broad.412 However, as has been seen over the years since TSCA’s passage, EPA has been very limited in using this authority because under the old statute it was very

411 Government Accountability Office. Chemical Regulation: Observations on the Toxic Substances Control Act and EPA Implementation. GAO-13-696T. Washington, DC. 2013. 15 U.S.C. § 2601(b) (2002). 412 Section 3 of TSCA provides a very broad definition of “chemical substance” that is inclusive of nearly every chemical intended for commercial purposes in the United States unless specifically excluded. Some examples of substances excluded include food, drugs and cosmetics, which are regulated under other federal statutes.

Freedom Industries, Inc. Investigation Report May 2017

106

burdensome and time consuming to comply with its requirements. In general, it has historically been much easier for EPA to regulate new chemical substances than to regulate existing ones. 5.6.1.1 Chemical Testing The first policy stated by Congress in TSCA is that “adequate data should be developed with respect to the effect of chemical substances and mixtures on health and the environment and the development of such data should be the responsibility of those who manufacture and those who process such chemical substances and mixtures.”413 Although TSCA authorizes EPA to promulgate rules that require chemical companies to conduct tests on chemicals and submit the resulting data to EPA, TSCA does not require chemical companies to develop information on the harmful effects of new or existing chemicals on human health or the environment. Given the burdensome requirements and hurdles that had to be cleared for EPA to actually require testing under a “test rule,” EPA largely relied on the voluntary undertaking of testing and submission of data from chemical companies. However, when companies are left to conduct testing themselves, the scope and quality of those tests may be limited. Even though Eastman conducted numerous studies on both Crude and 4-MCHM, none of those tests were long-term studies at low doses that would have assisted public health professional in promptly communicating the risk of exposure when residents began reporting symptoms.

Section 4 of TSCA gives EPA authority to issue rules requiring manufacturers and processers to undertake and submit the results of new testing on chemicals for their effects on human health and the environment.414 Section 4(a) provides EPA with two ways of requiring testing of chemical substances, either through a “hazard finding” or an “exposure finding.”415 Under either avenue, EPA must make certain findings before issuing a test rule. By making a hazard finding, EPA must determine that a chemical substance “may present an unreasonable risk of injury to health or the environment.”416 In order to survive judicial review, EPA has the burden of showing that the risk is “a more-than-theoretical probability.”417 Stakeholders and environmentalists often referred to this as a “Catch-22” because it required EPA to have risk information before requiring risk information to actually be developed through testing.

The United States Government Accountability Office (GAO) reported in 2005 that EPA found its authority under Section 4 to be difficult, time consuming and costly to use.418 As a result, since EPA first began reviewing chemicals under TSCA in 1979, it has used its authority to require testing for only

413 15 U.S.C. § 2601(b)(1) (2002). 414 Section 4 of TSCA is codified at 15 U.S.C. § 2603. 415 The second way EPA may promulgate a test rule is by making an exposure finding and determining that there are substantial quantities of the chemical substance and it may enter the environment, and there is, or may be, significant or substantial human exposure. Under either avenue, EPA must also find that insufficient data exist regarding the effects of the chemical and testing of such substance or mixture with respect to such effects is necessary to develop such data. 15 U.S.C. § 2603(a)(1)(A) and (a)(1)(B) (2002). 416 15 U.S.C. § 2603(a)(1)(A) (2002). 417 Chem. Mfrs. Ass’n v. EPA, 859 F.2d 977 (D.C. Cir. 1988). 418 Government Accountability Office. Chemical Regulation: Options Exist to Improve EPA’s Ability to Assess Health Risks and Manage Its Chemical Review Program. GAO-05-458. Washington, DC. June 2005.

Freedom Industries, Inc. Investigation Report May 2017

107

approximately 200 of the 84,000 chemicals in commerce.419 Further complicating the matter is that once EPA has sufficient information to satisfy these requirements, EPA had to go through the formal rulemaking process to require testing, which can be, and usually is, a long and arduous process. In fact, according to a GAO report, EPA officials stated that finalizing a test rule can take from 2 to 10 years and requires expenditure of substantial resources.420 5.6.1.2 New Chemical Review Section 5 of TSCA requires manufacturers, importers and processors to notify EPA at least 90 days before producing or otherwise introducing a new chemical product or a significant new use of an existing chemical into the United States.421 Manufacturers of new chemical substances must submit a premanufacture notice (PMN) to EPA prior to manufacturing the substance for nonexempt commercial purposes.422 Manufacturers or processors that plan to use an existing chemical in a way EPA finds423 to be a “significant new use” must submit a significant new use notice (SNUN). However, the only information required to be submitted with a PMN or SNUN is any information or test data that are known to, reasonably ascertainable by or in possession of the notifier, and which is related to the effect of any manufacturing, processing or distribution on health or the environment.424

Before Eastman began selling Crude MCHM, the company needed to ensure that all chemicals in the mixture were on the TSCA inventory or that a PMN was submitted for any chemical not listed. On October 20, 1997, Eastman submitted a PMN for the 4-(methoxymethyl)cyclohexane methanol. Eastman identified it as a component of Crude MCHM, which is a co-product as part of CHDM production. The other components of Crude MCHM that Eastman listed were already included on the TSCA inventory. Among the information submitted with the PMN was the physical and chemical properties of the chemical, the process description, an estimate of worker exposure and a safety data sheet for Crude MCHM that lacked any toxicological data. The chemical cleared EPA’s PMN review in 1998 and Eastman began selling Crude MCHM commercially.

EPA does not require specific toxicological information to be submitted. Instead of the burden being on the manufacturer to prove that a chemical substance is safe, manufacturers and importers satisfy the Section 5 requirements by providing existing relevant information on the substance. In the absence of detailed information or test data, EPA is left to rely on scientific models to predict a substance’s health or environmental effects, which can be difficult and unreliable, thus leaving open the possibility of a dangerous substance entering commerce without its effects being known. In the absence of chemical data,

419 Ibid. 420 Ibid. 421 15 U.S.C. § 2604(a)(1) and (a)(2) (2002); CRS Report RL31905. The Toxic Substances Control Act (TSCA): A Summary of the Act and Its Major Requirements. Congressional Research Service, Washington, DC. 2013. 422 15 U.S.C. § 2604(a)(1)(A) (2002); EPA. Filing a Pre-manufacture Notice with EPA. https://www.epa.gov/reviewing-new-chemicals-under-toxic-substances-control-act-tsca/filing-premanufacture- notice-epa (August 2, 2016). 423 EPA must make this determination by rule. The Administrator must consider all relevant factors listed under 15 U.S.C. § 2604(a)(2) (2002). 424 15 U.S.C. § 2604(d)(1)(A) and (B) (2002). If the Administrator promulgates a test rule under Section 4 of TSCA however, then that information is also required to be included in the PMN or SNUN.

Freedom Industries, Inc. Investigation Report May 2017

108

EPA relies mostly on scientific models to screen new chemicals. However, these models do not always accurately determine the chemicals’ properties and full health effects.425 5.6.1.3 Control of Chemicals In addition to information gathering and testing authority, TSCA also grants EPA the power to regulate certain substances. Section 6 authorizes EPA to adopt rules regulating the manufacturing, processing, use and disposal of existing chemicals when there is a reasonable basis to conclude that the substance presents or will present an unreasonable risk of injury to health or the environment.426

In order to regulate an existing chemical under Section 6(a), EPA must go through the full formal rulemaking process. Further, EPA must select the least burdensome requirements from those potential requirements that would protect adequately against the unreasonable risk.427 For example, if EPA finds that it can manage the unreasonable risk through the use of warning labels, then it cannot ban the use of that chemical. Finally, in order to withstand judicial review, EPA must also develop substantial evidence in the rulemaking record. This includes a cost-benefit analysis and, “according to EPA officials, the economic costs of regulating a chemical are usually more easily documented than the risks of the chemical or the benefits associated with controlling those risks, and it is difficult to show by substantial evidence428 that EPA is promulgating the least burdensome requirement.”429

Some of the problems with Section 6 include the extreme burden placed on EPA to both regulate the substance and survive judicial review by showing it is the least burdensome control. The burden is on EPA to show that the chemical presents or will present an unreasonable risk to the public.430 For EPA to have met this burden under the old statute, a test rule would have likely had to have been promulgated in order to obtain substantial evidence to regulate under Section 6. This led to a long burdensome process and has resulted in EPA issuing regulations under Section 6 to ban or limit the production or restrict the

425 Government Accountability Office. Chemical Regulation: Options Exist to Improve EPA’s Ability to Assess Health Risks and Manage Its Chemical Review Program. GAO-05-458. Washington, DC. June 2005. 426 15 U.S.C. § 2605(a) (2002). 427 Ibid. 428 The extreme burden of judicial scrutiny is demonstrated by the regulation of asbestos. EPA started considering asbestos rulemaking in 1979. EPA, under the authority of TSCA Section 6, issued a rule in 1989 phasing out most uses of asbestos. However, the U.S. Court of Appeals for the Fifth Circuit returned part of this rule because it felt that EPA failed to show that a flat-out ban was the “least burdensome” option and because EPA failed to support the decision on the record with substantial evidence. This decision was rendered despite the fact that EPA spent 10 years preparing its rule and had a huge body of scientific evidence on the adverse health effects of asbestos. As of today, there still isn’t an outright ban on asbestos in the United States. This case illustrates the burdensome procedural requirements of TSCA Section 6 and the effect of the heightened standard of judicial scrutiny codified in TSCA. Corrosion Proof Fittings v. EPA, 947 F.2d 1201 (5th Cir. 1991); Government Accountability Office. Chemical Regulation: Observations on the Toxic Substances Control Act and EPA Implementation. GAO-13-696T. Washington, DC. 2013. 429 Government Accountability Office. Chemical Regulation: Options Exist to Improve EPA’s Ability to Assess Health Risks and Manage Its Chemical Review Program. GAO-05-458. Washington, DC. June 2005. 430 15 U.S.C. § 2605(a) (2002).

Freedom Industries, Inc. Investigation Report May 2017

109

use of only five existing chemicals or chemical classes out of over 84,000 chemicals currently listed on the TSCA inventory.431 5.6.2 Frank R. Lautenberg Chemical Safety for the 21st Century Act The Frank R. Lautenberg Chemical Safety for the 21st Century Act (Chemical Safety Act) was signed by the President and became law on June 22, 2016. The Chemical Safety Act amends TSCA and addresses many of the deficiencies in the statute as well as those identified in earlier reform bills. The statute gives EPA greater authority to require testing of both new and existing chemicals, requires EPA to review all existing chemicals and removes the burdensome cost-benefit analysis from the existing safety standard while implementing a new one.432 As it relates to the Freedom incident, when EPA is prioritizing existing chemicals for review under the new framework, it must consider storage near significant sources of drinking water when determining the chemical’s risk.433 This may allow seemingly low hazard chemicals to be considered high priority based on the potential to contaminate source water. This is one of the improvements found in the Chemical Safety Act, as explained below.

EPA’s authority to require testing of both new and existing chemicals is enhanced. Unlike the old statute, testing can now be required by rule, order or consent agreement.434 This change addresses one of the major hurdles EPA faced with the long, complex rulemaking process. EPA is also provided with the authority to require the development of information for the purposes of prioritization if necessary.435 This change addresses the Catch-22 problem discussed previously, because a lack of information for EPA to make a determination would now be sufficient to require manufacturers to produce more information.

EPA’s new chemical review is also strengthened. Manufacturers and processors will still be required to submit PMNs but now EPA must review these notices and make an explicit determination that it doesn’t meet the safety standard; that there is insufficient information or the chemical will be produced in substantial quantities and the chemical will be regulated pending the development of information; or that it meets the safety standard.436 As explained above, when Eastman began producing Crude MCHM for commercial production, it had to submit a PMN for one of its constituents. Under the new statute, EPA may have requested more information and would have been required to determine whether or not the chemical would present an unreasonable risk.

Whether it is a new or existing chemical, the statute also revises the safety standard to remove the cost- benefit analysis that has hindered the agency in the past.437 The new safety standard also requires EPA to take into account potentially exposed or susceptible subpopulations, which means “a group of individuals

431 Government Accountability Office. Chemical Regulation: Observations on the Toxic Substances Control Act and EPA Implementation. GAO-13-696T. Washington, DC. 2013. 432 EPA must determine whether a chemical use poses an unreasonable risk. This excludes consideration of costs or other nonrisk factors. EPA must also consider risks to susceptible and highly exposed populations. 433 15 U.S.C. § 2605(b)(1)(A) (2016). 434 15 U.S.C. § 2603(a)(1)(B) (2016). 435 15.U.S.C. § 2603(a)(2)(B) (2016). 436 15 U.S.C. § 2604(a)(3) (2016). 437 15 U.S.C. § 2604(a)(3)(C) (2016) and 15 U.S.C. § 2605(b)(4)(A) (2016) – “without consideration of costs or other nonrisk factors.”

Freedom Industries, Inc. Investigation Report May 2017

110

within the general population identified by the Administrator who, due to either greater susceptibility or greater exposure, may be at greater risk than the general population of adverse health effects from exposure to a chemical substance or mixture such as infants, children, pregnant women, workers, or the elderly.”438 EPA can also now regulate chemicals without demonstrating that it is the least burdensome alternative.439 As explained above, this requirement in the old statute has resulted in EPA regulating very few chemicals since its enactment.

EPA will be required to review all existing chemicals in commerce under the Chemical Safety Act, and not later than one year after enactment EPA must establish by rule a risk-based screening process to designate substances as either high- or low-priority substances for which risk evaluations are not warranted at this time.440 When determining risk, EPA will be required to consider susceptible subpopulations as well as storage near significant sources of drinking water. By December 22, 2016, EPA must ensure that risk evaluations are being conducted on ten chemical substances from the 2014 TSCA work Plan.441 Within 3.5 years, EPA is required to ensure that additional risk evaluations are being conducted on at least 20 high-priority substances and that at least 20 low-priority substances have been designated.442 As of April 2016, there are currently over 84,000 chemical substances listed on the TSCA inventory for which risk evaluations will eventually have to be completed.

Once a risk evaluation is completed for a chemical, EPA must designate a new chemical for evaluation.443 A total of 25-50% of chemicals designated at any time can be industry requested.444 This provision coupled with the preemption clauses in previous bills has been a source of tension between industry and environmental groups. However, the new preemption provisions in this statute address some of those concerns.

Under TSCA’s new preemption provisions, states may not establish or continue to enforce a statute or administrative action to prohibit the development or use of a chemical substance when EPA has determined that the substance does not present an unreasonable risk or is being restricted by EPA following a risk evaluation.445 Further, states are barred from enacting new statutes or creating prohibitions from the date EPA defines the scope of or publishes a risk evaluation for a chemical substance.446 Because the process of finalizing a risk evaluation can take years, the statute provide states with the opportunity to take action on a chemical substance within 18 months of EPA initiating the prioritization process for a chemical substance by enacting a statute or finalizing an administrative action.447 Additionally, nothing in the statute shall be construed to preempt or otherwise affect any state

438 Ibid. 439 Sec. 6, 1(D), H.R. 2576, Frank R. Lautenberg Chemical Safety for the 21st Century Act. 114 Congress. 2016. 440 15 U.S.C. § 2605(b)(1)(A) (2016). 441 15 U.S.C. § 2605(b)(2)(A) (2016). 442 15 U.S.C. § 2605(b)(2)(B) (2016). 443 15 U.S.C. § 2605(b)(3)(A) (2016). 444 15 U.S.C. § 2605(b)(4)(E) (2016). 445 15 U.S.C. § 2617(a)(1)(B) (2016). 446 15 U.S.C. § 2617(b)(1) (2016). 447 15 U.S.C. § 2617(f)(2)(B) (2016).

Freedom Industries, Inc. Investigation Report May 2017

111

law or regulation enacted or imposed prior to April 22, 2016.448 Combined, these preemption provisions allow states to continue to enforce any laws or regulations passed prior to April 2016 and to act to ensure that any chemicals being prioritized are sufficiently regulated while EPA is evaluating a chemical and prior to EPA issuing any final restrictions or making any determinations. Once EPA issues any restrictions on a chemical, states are also free to issue identical requirements so long as the penalties are no more stringent than the penalties and sanctions available to EPA.449 This will allow states to co- enforce restrictions and ensure chemicals are properly regulated within their borders.

Overall, the Chemical Safety Act amends and strengthens TSCA and addresses many of its major deficiencies. Ultimately, the Chemical Safety Act will lead to more information available for existing chemicals and more informed decisions for emergency response agencies, water utility companies and the public in general. However, EPA is still in the process of proposing regulations to determine how chemicals will be prioritized and assessed, and until these regulations are finalized it is unclear how the statute will be implemented. Additionally, given the large number of existing chemicals in commerce, even if EPA exceeds the minimum statutory requirements, it will take years for information to be available for all existing chemicals. Therefore, it is important for states to remain vigilant in protecting source waters and the public from potential unknown hazards. 5.7 Occupational Safety and Health Administration The Occupational Safety and Health Act of 1970 created OSHA450 to ensure safe and healthful conditions for working men and women. One means prescribed by Congress to achieve this goal is the mandate given to, and authority vested in, the Secretary of Labor to set mandatory safety and health standards. OSHA used this mandate to first issue an HCS in 1983 and has continued to use this authority to update the HCS. At the time of the incident, regulated entities were required to comply with the 1994 HCS, which was the most recent version of the standard in effect. 5.7.1 OSHA’s Hazard Communication Standard OSHA’s HCS is a standard that covers all hazardous chemicals as well as all workplaces where they are used.451 This regulation requires distributors to conduct a hazard determination and to transmit any hazard information to their employees and customers.452 Providing information on hazards to customers allows them to ensure protection in their own workplace.453 An SDS is the device used to transmit this information. For each hazardous chemical produced or imported, chemical manufacturers and importers shall obtain or develop an SDS.454 The HCS also requires employers to provide their employees with

448 15 U.S.C. § 2617(e)(1)(A) (2016). 449 15 U.S.C. § 2617(d)(1)(B) (2016). 450 29 U.S.C. 15 §§ 651-678 (2012). 451 OSHA. Hazard Communication in the 21st Century Workplace. https://www.osha.gov/dsg/hazcom/finalmsdsreport.html (August 2, 2016). 452 29 C.F.R. § 1910.1200(b)(1) (1994).

453 OSHA. Hazard Communication in the 21st Century Workplace. https://www.osha.gov/dsg/hazcom/finalmsdsreport.html (August 2, 2016). 454 29 C.F.R. § 1910.1200(g)(1) (1994).

Freedom Industries, Inc. Investigation Report May 2017

112

information about the hazardous chemicals to which they are exposed. Employers must further ensure that the SDSs for each hazardous chemical onsite are accessible to employees.455 The 1994 update to the HCS was the most recent version of the Hazard Communication Standard until it was amended in 2012 to be consistent with the United Nations Globally Harmonized System of Classification and Labeling of Chemicals (GHS).456 However, the effective date for compliance with all modified provisions of the 2012 standard was not until June 2015.457 Therefore, at the time of the spill, Eastman (Crude MCHM), Dow (PPH, Basic) and Freedom (ShurFlot 944 and PPH, stripped) were regulated under the 1994 HCS.458 The 1994 HCS provides a very broad definition of “hazardous chemical” to include “any chemical which is classified as a physical hazard or a health hazard.”459 The HCS requires manufacturers and importers to conduct a hazard determination460 in order to determine if a chemical poses either a physical461 hazard or a health462 hazard. The hazard determination requirement, however, is performance-oriented, and regulated parties that evaluate chemicals are not required to follow any specific methods for determining

455 Ibid. 456 The GHS uses the term “safety data sheet” and therefore the regulation no longer uses the term “material safety data sheet.” Although the content of the sheets has not changed, the formatting has. For purposes of this report, any safety sheet will be referred to as an SDS despite the fact it may not comply with the updated format and was referred to as an MSDS at the time of the spill. 457 Compliance with all modified provisions of the 2012 standard must have taken place by June 1, 2015, except that the Distributor had until December 1, 2015, to comply with shipping containers with a GHS label. 458 The GHS establishes standardized criteria for determining the health, environmental and physical hazards associated with chemicals. The GHS includes standardized requirements for labels and SDSs including consistent use of pictograms, signal words and harmonized statements. Under this approach, distributors, manufacturers and employers know exactly how to convey the hazards of the chemical once they complete the chemical evaluation and hazard classification. Although the 2012 amended regulation changes the way chemicals are classified and the way information is presented, it does not add any substantive requirements for developing toxicological or hazard information. Just like the 1994 HCS, the amended regulation still does not require any testing to be done and specifically states that testing is not required. Instead, chemical manufacturers, importers or employers classifying chemicals are only required to identify the full range of available scientific literature and other evidence concerning the potential hazards. Under the 2012 HCS, the evaluation and classification of mixtures is also roughly the same. 459 29 C.F.R. § 1910.1200(c) (1994). 460 A “hazard determination” is the process of evaluating available scientific evidence in order to determine its hazards. 29 C.F.R. § 1910.1200, Appendix B (1994). 461 29 C.F.R. § 1910.1200(c) (1994): “Physical hazard” means a chemical for which there is scientifically valid evidence that it is a combustible liquid, compressed gas, explosive, flammable, organic peroxide, oxidizer, pyrophoic, unstable (reactive) or water reactive. 462 29 C.F.R. § 1910.1200(c) (1994): “Health hazard” means a chemical for which there is statistically significant evidence based on at least one study conducted in accordance with established scientific principles that acute or chronic health effects may occur in exposed employees. The term “health hazard” includes chemicals that are carcinogens, toxic or highly toxic agents, reproductive toxins, irritants, corrosives, sensitizers, hepatotoxins, nephrotoxins, neurotoxins, agents that act on the hematopoietic system and agents which damage the lungs, skin, eyes or mucous membranes. Appendix A of the standard provides further definitions and explanations of the scope of health hazards covered by this section, and Appendix B of the standard describes the criteria to be used to determine whether or not a chemical is to be considered hazardous for purposes of this standard.

Freedom Industries, Inc. Investigation Report May 2017

113

hazards.463 Parties must be able to demonstrate that they have adequately ascertained the hazards of the chemicals produced or imported.464 Employers, however, are not required to evaluate chemicals if they choose to rely on the evaluation performed by the chemical manufacturer or importer.465

The HCS considers Shurflot 944, Crude MCHM and PPH, stripped to be hazardous chemicals because of the hazards they pose. Consequently, Freedom was required to have an SDS for these mixtures that would communicate any known risks to its employees. Freedom’s SDS states that PPH, stripped causes skin and serious eye irritation. Chemicals that are irritants are included under the definition of health hazard; therefore, PPH, stripped qualifies as a hazardous chemical and triggers the requirement of an SDS.

Eastman’s SDS states that Crude MCHM is harmful if swallowed (toxic) and causes skin and eye irritation (irritant). The SDS also states that, at elevated temperatures, its vapor may cause eye and respiratory tract irritation (irritant). Irritants and toxic chemicals are both categories included under the definition of health hazard, which makes Crude MCHM a hazardous chemical subject to the SDS requirement.

According to Eastman, Crude MCHM sold to Freedom does not contain PPH.466 However, the release on January 9, 2014, was a mixture of Crude MCHM and PPH, stripped—known as Shurflot 944. CSB learned that Freedom blended Crude MCHM and PPH, stripped at the ERT site prior to distribution to its customers. As a result, Freedom was required to conduct a hazard determination. If this mixture presented different hazards than those of its individual components, Freedom would have been required to create a new SDS for the new mixture.467

In classifying mixtures that have not been tested as a whole, manufacturers and importers shall assume the mixture to “present the same health hazards as do the components which comprise one percent or greater of the mixture.”468 According to Freedom’s Hazard Communication Program for ERT, an outside consultant prepared SDSs for Freedom. It appears the consultant relied on the information included in Eastman’s SDS for Crude MCHM and included the same hazards, warnings and toxicological information in Freedom’s SDS for ShurFlot 944. Absent any knowledge of new hazards from the mixtures, the consultant could rely on the information included in the SDSs for Crude MCHM and PPH, stripped.

Further, under the HCS, neither Freedom nor Eastman was required to do any chemical testing because the HCS is a communication standard and does not require testing. Rather, the HCS required the parties to

463 OSHA. Guidance for Hazard Determination for Compliance with the OSHA Hazard Communication Standard. https://www.osha.gov/dsg/hazcom/ghd053107.html (August 2, 2016). 464 29 C.F.R. § 1910.1200, Appendix B (1994). 465 29 C.F.R. § 1910.1200(d)(1) (1994). 466 Eastman. Questions and Answers Regarding Eastman’s Assistance in the Emergency Response to the Spill of Crude MCHM in Charleston, West Virginia, February 27, 2014. http://www.eastman.com/literature_center/misc/q_and_a_west_virginia_spill.pdf (August 5, 2016). 467 29 C.F.R. § 1910.1200(D)(5) (1994). 468 29 C.F.R. § 1910.1200(d)(5)(ii).

Freedom Industries, Inc. Investigation Report May 2017

114

consider the available scientific evidence concerning the hazards.469 Although many tests have been performed voluntarily, there are many chemicals for which tests have not been done.470 As a result, limited information may be available on all aspects of a chemical’s effects. Thus, the availability of test data affects the quality of the information on the SDSs. Even the best available evidence may not provide sufficient information about the hazardous effects.

Under the 1994 standard, chemical manufacturers, importers and employers who evaluate chemicals are not required to follow any specific methods for determining hazards, but they must be able to demonstrate that they adequately ascertained the hazards of the chemicals produced or imported.471 Since testing is not required under either the 1994 HCS or the 2012 HCS, information communicated through the SDS comes from voluntary testing done by industry and/or third parties or through other statutes and regulations that may require testing for chemicals. For example, under TSCA, EPA has the authority to require chemical testing and to regulate hazardous substances. For further analysis of TSCA, refer to Section 5.6 of this report. 5.7.1.1 Toxicological Information Required under the HCS The 1994 HCS requires health hazards, including signs and symptoms of exposure, and any medical conditions that are generally recognized as being aggravated by exposure to the chemical, to be reported on the SDS.472 Additionally, parties are to include on their SDS the primary routes of entry473 and whether the hazardous chemical is listed in the National Toxicology Program Report on Carcinogens or has been found to be a potential carcinogen in the International Agency for Research on Cancer Monographs or by OSHA.474 This information is to be obtained by examining all available data on the chemicals for which an SDS is being created. Given the lack of a testing requirement, the scientific data available are often limited. This is especially true when considering mixtures.

A majority of marketed chemical products are mixtures of chemicals that are often produced by a single manufacturer.475 Often, limited information is available for mixtures, which makes the hazards presented by mixing the chemicals difficult to predict.476 To address this problem, the HCS requires “the chemical manufacturer to consider the mixture to have the same effects as its hazardous ingredients in most situations.”477 The “chemical and physical properties and hazards of pure elements and chemical

469 29 C.F.R. § 1910.1200(d)(2) (1994). 470 OSHA. Hazard Communication in the 21st Century Workplace. https://www.osha.gov/dsg/hazcom/finalmsdsreport.html (August 2, 2016). 471 29 C.F.R. § 1910.1200, Appendix B (1994). 472 29 C.F.R. § 1910.1200(g)(2)(iv) (1994). 473 Ibid. 474 29 C.F.R. § 1910.1200(g)(2)(vi) (1994). 475 OSHA. Hazard Communication in the 21st Century Workplace. https://www.osha.gov/dsg/hazcom/finalmsdsreport.html (August 2, 2016). 476 Ibid. 477 This is true where there are no available data for the specific mixture; Ibid.

Freedom Industries, Inc. Investigation Report May 2017

115

compounds are precise and constant,”478 but the properties of complex mixtures can vary considerably, which may result in incomplete or misleading information communicated on an SDS.

The HCS has specific requirements for mixtures that depend on the availability of test data. Under the 1994 HCS, if a mixture has been tested as a whole, then those results should be used to determine whether the mixture is hazardous.479 However, if a mixture has not been tested as a whole for health hazards, the mixture shall be assumed to present the same hazards as components that comprise 1% or more of the mixture.480 Where mixtures are complex and include numerous chemicals, the SDS for that mixture is also complicated and the user is required to make some judgments on how to apply the information in a certain situation.

The HCS defines a mixture as any combination of two or more chemicals if the combination is not, in whole or in part, the result of a chemical reaction.481 Although on the day of the incident and in the days following the material that leaked from tank 396 was referred to as Crude MCHM and PPH, stripped, CSB found that Freedom sold this mixture under the commercial name Shurflot 944.482 The SDS for Shurflot 944 states that it consists of a blend of alcohols, glycol ethers and carboxylates and does not specifically disclose that it consists of Crude MCHM and PPH, stripped. Under the toxicological information section, Freedom included the same information for skin sensitization and acute oral and dermal toxicity as was included in the Crude MCHM SDS. CSB found no evidence of Freedom conducting further testing on the Shurflot 944 mixture; therefore, it is not known whether the mixture as a whole presents greater hazards than its individual components. 5.7.2 Flammable and Combustible Liquids under 29 C.F.R. § 1910.106 Immediately after the spill, OSHA’s Charleston Area Office inspected the Freedom facility and cited the company for three violations. One of the citations was for the deteriorating containment wall, which was required to be liquidtight under 29 C.F.R. § 1910.106. Because Freedom was storing flammable liquids, the company was required to comply with 29 C.F.R. § 1910.106, which regulates facilities that have flammable and/or combustible liquids stored onsite. Under the regulation, “flammable liquid” means any liquid having a flash point at or below 199.4°F (93°C). Flammable liquids are further divided into four categories based on a chemical’s flash point and boiling point; however, any chemical with a flash point below 199.4°F, regardless of class, is covered under the subsection requiring dikes and/or drainage.

According to Eastman’s SDS, Crude MCHM has a flash point of 235.04°F (112.8°C) and according to Freedom’s SDSs for PPH, stripped and Shurflot 944, both have a flash point of over 253°F (122.78°C). None of these chemicals would appear to be flammable nor within the scope of § 1910.106; however, after the incident OSHA found the flash point of the sampled liquid to be much lower. Immediately after

478 OSHA. Guidance for Hazard Determination for Compliance with the OSHA Hazard Communication Standard. https://www.osha.gov/dsg/hazcom/ghd053107.html (August 2, 2016). 479 29 C.F.R. § 1910.1200(d)(5)(i) (1994). 480 29 C.F.R. § 1910.1200(d)(5)(ii) (1994). 481 29 C.F.R. § 1910.1200(g)(c) (1994). 482 OSHA obtained samples of the spilled material on the day of the incident after they were transported to the Poca blending site. The samples were analyzed by the Salt Lake Technical Center. See Section 3.1.

Freedom Industries, Inc. Investigation Report May 2017

116

the spill, OSHA collected samples of the spilled material that was transported to the Poca Blending facility. On January 9, 2014, and in the days that followed, the contents of the Freedom tanks were transported to Poca Blending by Diversified Services and were stored in five Baker Frac Tanks483 at that site. One of the Frac Tanks at Poca purportedly contained the contents of tank 396 and four other Frac Tanks contained a mixture of liquids transported from tanks 395, 396 and 397. OSHA collected a sample from each one of these tanks and the samples were shipped to the OSHA Salt Lake Technical Center484 to determine the liquid’s flash point. SLTC determined that the samples taken from the Frac Tank that contained material from tank 396 had a flash point of 199.8°F (93.22°C). The other four samples that contained mixtures from tanks 395, 396 and 397 had flash points of 204.8°F (96°C), 192.7°F (89.28°C), 193.1°F (89.5°C) and 191.3°F (88.5°C), respectively.

Because the tests conducted by SLTC yielded flash points below 199.4°F, the tanks containing spilled liquid were subject to the provision pertaining to drainage, dikes and walls for ASTs under § 1910.106.485 Under this provision, the area surrounding a tank or a group of tanks containing flammable liquids shall be provided with drainage or shall be diked to prevent accidental discharge of liquid from endangering adjoining property or reaching waterways.486 29 C.F.R. § 1910.106 requires the “walls of the diked area shall be of earth, steel, concrete or solid masonry designed to be liquidtight and to withstand a full hydrostatic head.”487 The Freedom facility had a containment wall that surrounded all of the ASTs and extended the length of the property. This dike was to serve as a secondary containment system in case of a spill. However, this wall was in disrepair and was not liquidtight, as evidenced by visual examination (see Figure 24 in Section 3.3.2) and the liquid that leaked through the wall on January 9, 2014.

483 Baker Frac Tanks were used to hold the material cleaned up at Freedom Industries following the spill. These steel tanks provide flexible liquid containment capacity for projects. 484 The Salt Lake Technical Center laboratory analyzes over 400 chemicals and maintains OSHA’s online Chemical Sampling Information File that provides method and sampling information. See Section 3.1 for a more detailed discussion of the chemical testing conducted at SLTC. 485 29 C.F.R. § 1910.106(b)(2)(vii) (2016). 486 29 C.F.R. § 1910.106(b)(2)(vii) (2016). 487 29 C.F.R. § 1910.106(b)(2)(vii)(c)(3) (2016).

Freedom Industries, Inc. Investigation Report May 2017

117

  1. 0 KEY FINDINGS

Chemical Safety Board (CSB) investigators gathered information to understand both the technical cause of the incident as well as the role of WVAW and federal, state and local agencies when responding to the contaminated water supply. In examining these issues, CSB identified the following key findings:

  1. At Freedom Industries, a mixture containing Crude MCHM and PPH, stripped leaked from an

aboveground storage tank (tank 396) through two holes. These holes, measuring approximately 0.75 and 0.4 inches in diameter, formed due to pitting corrosion that degraded the thickness of the tank floor from the interior. Although the soil side of the tank bottom was corroded as most tank bottoms are, the amount of soil side corrosion was insignificant compared to the pitting corrosion that directly led to the incident.

Once the mixture escaped tank 396, it moved through the soil beneath the tank and migrated to the Elk River through two pathways: (1) the failing secondary containment wall located between tank 396 and the Elk River, and (2) a deteriorated underground culvert located around tank 396.

CSB found no documentation of prior inspections or maintenance conducted by Freedom or the prior facility owner, Etowah River Terminal (ERT), which would have identified and addressed internal corrosion in tank 396. Such inspections and maintenance could have identified and addressed the interior corrosion and holes in tank 396.

Freedom was required to maintain adequate secondary containment under the West Virginia/National Pollutant Discharge Elimination System (NPDES) General Water Pollution Control Permit’s Stormwater Pollution Prevention Plan and the Groundwater Protection Rule. Freedom was aware of the deteriorated secondary containment wall but did not repair it prior to the incident. CSB found no evidence that Freedom or ERT implemented a Stormwater Pollution Prevention Plan or Groundwater Protection Plan. WVDEP did not inspect the site for compliance with these programs due to resource constraints.

Freedom did not have any leak prevention or leak detection system in place to immediately provide notification of tank leaks.

Once the mixture containing Crude MCHM and PPH, stripped entered the Elk River, it flowed into WVAW’s water intake, located about 1.5 miles away from the Freedom facility site. The water treatment process was not capable of fully treating and removing the chemical. This allowed the mixture to contaminate the drinking water.

WVAW and WVBPH decided WVAW could not shut down its drinking water treatment system because there was no alternative raw water supply and doing so could have compromised fire protection and sanitation. In addition, depressurizing the water distribution system would have caused extensive damage and further delays in water restoration. Accordingly, a “Do Not Use” order was issued less than two hours after WVAW detected odors in the treated water intended

Freedom Industries, Inc. Investigation Report May 2017

118

for distribution.

The DNU order was not issued immediately because WVAW was mistakenly informed that MCHM was a flocculant, rather than a frothing agent, and that only 1,000 gallons was released. WVAW assumed its water treatment and filtration system was capable of fully treating and removing the chemical from the water.

Source water protection efforts vary by state, and as a result, surface water treatment plants across the United States are subject to different requirements to protect drinking water sources. In response to new state requirements after the Freedom incident, WVAW submitted a source water protection plan to WVBPH that goes beyond existing federal requirements. Because American Water (AW) provides guidance and some oversight through required policies to its subsidiary water utilities across the United States, AW is well positioned to establish requirements for its subsidiary surface water treatment plants to develop and implement plans similar to WVAW’s plan to ensure they are adequately prepared for potential contamination events.

Local, state and federal public health officials only had information from Eastman’s Crude MCHM Safety Data Sheet and later, toxicological studies, to communicate to the public and credibly determine the risk of exposure. As the crisis evolved, residents in the Charleston area were given unclear and conflicting announcements because of the changing information from Freedom and government agencies, which increased public uncertainty about the safety of the drinking water.

The American Water Works Association, a nonprofit scientific and educational association for managing and treating water, is well positioned to assist water utilities by disseminating important lessons that are learned from chemical contamination incidents that could potentially affect a drinking water distribution system.

Freedom Industries, Inc. Investigation Report May 2017

119

  1. 0 LESSONS LEARNED

CSB’s investigation of Freedom led the agency to find several issues related to identifying and assessing hazardous chemicals stored near water treatment intakes, as well as responding to and communicating public health risks during drinking water contamination incidents. Since the incident, the State of West Virginia, WVAW, and other agencies and organizations have established requirements and implemented practices that have addressed many of the gaps that CSB identified early in its investigation. Because requirements regarding ASTs and source water protection vary by state, CSB has developed the following key lessons for AST owners and operators, state governments, drinking water utilities and public health officials across the United States to use so that they are adequately prepared for, can respond to and are able to effectively communicate the public health risks of an incident involving the release of a hazardous chemical near a drinking water source.

  1. AST owners and operators of facilities storing chemicals near drinking water sources should

establish regular inspection programs and routinely monitor tanks and secondary containment to verify tank integrity and containment of leaks. They should coordinate with nearby water utilities and emergency response organizations to ensure that the information about their stored chemicals (e.g., chemical characteristics, quantity, toxicological information) is communicated and can be made immediately available in the event of a leak.

AST owners and operators covered under existing regulatory programs (e.g., Spill Prevention, Control, and Countermeasure; National Pollutant Discharge Elimination System) should ensure that the associated spill prevention and protection plans under those programs are updated and implemented to reduce the potential for leaks from ASTs and secondary containment.

Due to the large number of existing chemicals in commerce, the Environmental Protection Agency’s review of all chemicals under the federal Toxic Substances Control Act could take years. Many of these chemicals lack toxicological information; therefore, states should take immediate action to protect source waters and the public from these unknown and potentially hazardous chemicals. This can be achieved through increased inspections and enforcement at chemical storage facilities near water sources and coordination between emergency response organizations and public health agencies.

States should establish Source Water Assessment Programs that mandate source water protection planning by water utilities. States should ensure that water utilities have full and simple access to the data necessary to support this mandate. Water utilities should complete Source Water Protection Plans that include the following components:

a. System operational information; b. Source water delineation and characterization; c. Potential significant sources of contamination; d. Management strategies; e. Source water monitoring; f. Communications and contingency; and g. Alternate sources of supply.

Freedom Industries, Inc. Investigation Report May 2017

120

Source Water Protection Plans should be updated at least every three years or when there is a substantial change in the potential sources of significant contamination within the identified zone of critical concern.

Water utilities should engage with their Local Emergency Planning Committee and/or State Emergency Response Commission to obtain Tier II information and use that information to identify water intakes that could potentially be at risk of contamination from those chemicals in the event of a spill.

Water utilities should assess the capabilities of their water treatment systems to treat and remove potential leaks from all potential sources of significant contamination within their zone of critical concern. Where feasible, water utilities should use established laboratory analytical methods to detect the presence or measure the concentration of potential hazardous chemicals or classes of hazardous chemicals.

Public health agencies should coordinate with water utilities, emergency response organizations and facilities that store chemicals near drinking water sources to ensure that information concerning chemicals and potential risks to the public are immediately available in the event of a spill. They should establish a communication framework to ensure information, as it becomes available, is communicated through one entity or organization.

Freedom Industries, Inc. Investigation Report May 2017

121

  1. 0 RECOMMENDATIONS

Several of the causal and contributing factors identified by CSB with respect to this incident have since been addressed by new legislation in West Virginia, revised policies and programs within WVDEP and WVAW, and the fact that Freedom Industries is no longer in operation. As a result, CSB’s recommendations from this investigation focus on ensuring that water utilities and public health agencies are able to obtain prompt and reliable information about potential drinking water contaminants and clearly communicate public health risks.

Pursuant to its authority under 42 U.S.C. § 7412(r)(6)(C)(i) and (ii), and in the interest of promoting safer operations at AST facilities and protecting workers and communities from future accidents nationally, CSB makes the following safety recommendations: The American Water Works Association 2014-01-I-WV-R1 Communicate the findings, lessons learned and recommendations contained within this report to all American Water Works Association members. Emphasize the importance of source water protection planning, emergency planning, and coordination with local, state and federal entities, and the public, to ensure timely notification of potential water contamination events and emergencies. American Water Works Company, Inc. 2014-01-I-WV-R2 Establish requirements for all American Water state utilities’ surface water treatment plants to undertake the following activities:

  1. Conduct an inventory of all hazardous chemicals or classes of hazardous

chemicals that are considered a potential source of significant contamination stored in the utility’s most vulnerable source water protection area (e.g., Zone of Critical Concern). Chemicals may be identified by accessing publicly available information, which may include Tier II reporting forms submitted to local emergency planning committees and electronically available information from federal, state or local databases.

  1. For each inventoried chemical or class of chemicals, conduct a prioritized

assessment to determine if existing analytical methods are available to detect the presence and/or concentration of the chemical or class of chemicals in the event of a release to the water supply and if the chemical or class of chemicals is capable of being treated or removed by the utility’s water treatment process.

  1. For all chemicals or classes of chemicals that are not capable of being treated

or removed by the treatment process, develop a contingency plan to respond to contamination events (e.g., as modeled by WVAW’s Kanawha Valley Water System June 2016 Source Water Protection Plan). Eastman Chemical Company 2014-01-I-WV-R3 Update appropriate sections of the Crude MCHM Safety Data Sheet to include toxicological and ecological information based on the June 1, 2016, National Toxicology Program’s toxicity evaluation of Crude MCHM. Include information

Freedom Industries, Inc. Investigation Report May 2017

122

about the effects of Crude MCHM on fetal and early life growth and development. Distribute the revised Crude MCHM SDS to all customers that previously received and are currently using or storing MCHM from Eastman, and ensure all new MCHM customers receive the revised SDS with shipment.

This signature block is placed immediately after the last recommendation.

By the U.S. Chemical Safety and Hazard Investigation Board

Vanessa Allen Sutherland Chair

Kristen Kulinowski Member

Manuel Ehrlich Member

Richard Engler Member

Date of Board Approval

Freedom Industries, Inc. Investigation Report May 2017

123

APPENDIX A: TANK LEAK TIMELINE

Table 11. Detailed MCHM Leak Timeline Date Time Event January 9, 2014 ~5:00 AM Charleston Fire Department (FD) Shift Commander reports detecting a “licorice” smell over a very large area in Charleston488

8:16 AM WVDEP receives a complaint about an unknown odor near the I-77 and I-79 split489

9:29 AM Additional complaints received through Kanawha County Metro 911490

11:05 AM WVDEP inspectors arrive at Freedom facility; Freedom employee notices MCHM pooled liquid around the bottom of the tank and flowing toward retaining wall

~11:36 AM WVDEP observes pool of leaked chemicals around the containment tanks at Freedom facility

11:56 AM WVDEP notifies WVAW Water Quality Supervisor of a possible flocculant spill of unknown quantity in Elk River

12:22 PM WVDHHR notifies WVAW that Crude MCHM, described as “a flocculant” is leaking into the river

~12:30 PM WVAW Water Quality Supervisor arrives at Freedom facility to assess leak

12:52 PM WVAW Water Quality Supervisor requests WVAW start feeding powder activated carbon and increase potassium permanganate (KMnO4)

1:00-1:30 PM WVAW Water Quality Supervisor reviews a copy of SDS for Crude MCHM from Freedom, notes chemicals are not consistent with what he expected for a flocculant

1:42 PM WVAW Water Quality Supervisor informs WVAW management that Crude MCHM is not a flocculant, but instead a frothing agent

2:00 PM Odor detected in raw water sample from Elk River

2:00 PM WVDEP Emergency Response coordinator called Kanawha Office of Emergency Management reporting that the spill was more than originally thought491

488 West Virginia Office of the Attorney General. Elk River Chemical Spill Incident Report. http://www.ago.wv.gov/Documents/010815-ElkRiverChemicalSpill.PDF (July 8, 2016). 489 Ibid. 490 Ibid. 491 Kanawha Putnam Emergency Planning Committee. West Virginia American Water Incident. After Action Report. 2014.

Freedom Industries, Inc. Investigation Report May 2017

124

4:00 PM Odor detected downstream of WVAW filters

5:15 PM Freedom President informs WVAW that 1,000 to 5,000 gallons of tank contents may have leaked

5:36 PM Governor issues statement advising residents to restrict tap water usage.492

5:45 PM WVAW issues DNU order for WVAW customers

8:00 PM Kanawha Charleston Health Department closes local businesses

9:34 PM Governor Tomblin declares state of emergency for nine counties493 January 10, 2014 6:00 AM President Obama declares nine affected West Virginia counties a federal disaster area494

CDC informs WVBPH that 1 part per million (ppm) is the appropriate screening level for oral ingestion of 4-MCHM- contaminated water

7:30 AM National Guard sampling detects concentrations of 4-MCHM at 3.35 ppm at the WVAW raw water intake and 2.4 ppm post- treatment by WVAW495 January 13, 2014

WVAW and WVBPH advises residents to flush pipes where 4- MCHM levels are below 1 ppm

DNU order lifted for approximately 25,000 customers496 January 14, 2014

DNU order lifted for additional areas (48,000 customers total)497 January 15, 2014 7:00 AM 346 patients treated at local hospitals within 6 days of the release

7:00 AM 4-MCHM detected in Ohio River at water treatment facilities in Ohio and Kentucky498

CDC and WVBPH issue drinking water advisory for pregnant women

492 Governor Tomblin. Twitter message. January 9, 2014. https://twitter.com/WVGovernor/status/421410251238170624 (February 7, 2017). 493 Governor Tomblin. Twitter message. January 9, 2014. https://twitter.com/WVGovernor/status/421467517677105152 (February 7, 2017). 494 FEMA. News Release: President Obama Signs West Virginia Emergency Declaration. http://www.fema.gov/news-release/2014/01/10/president-obama-signs-west-virginia-emergency-declaration (July 8, 2016). 495 Office of the Governor. WV Governor After Action Review. http://www.governor.wv.gov/Documents/After%20Action%20Review.PDF (July 8, 2016). 496 House Transportation and Infrastructure Committee. Testimony of Jeffrey L. McIntyre. http://www.amwater.com/files/McIntyre%20Testimony%202%206%202014%20Final.pdf (July 8, 2016). 497 Ibid. 498 On January 15, 2014, at 7:00 AM, 4-MCHM was detected in the Ohio River by Greater Cincinnati Water Works, and Louisville’s Zorn Avenue intake detected a concentration at 3.5 parts per billion in river water on January 18, 2014.

Freedom Industries, Inc. Investigation Report May 2017

125

DNU order lifted for additional areas (56,800 customers total)499 January 16, 2014

DNU order lifted for additional areas (71,000 customers total)500 January 17, 2014 6:50 AM Do Not Drink/Limited Contact order issued for certain areas; additional flushing and sampling needed due to 4-MCHM readings >1 ppm501

12:50 PM DNU ordered lifted for additional areas502 January 18, 2014

DNU order lifted for all areas503 January 21, 2014

Freedom announces PPH, stripped also present in leaking tank January 27, 2014

Freedom revises spill estimate to 10,000 gallons504

499 House Transportation and Infrastructure Committee. Testimony of Jeffrey L. McIntyre. http://www.psc.state.wv.us/scripts/WebDocket/ViewDocument.cfm?CaseActivityID=388885&NotType=%27W ebDocket%27 (July 8, 2016). 500 Ibid. 501 Ibid. 502 Ibid. 503 Ibid.(July 8, 2016). 504 WVDEP. News Release: Freedom Industries revises estimate for spill. January 27 2014. http://www.dhsem.wv.gov/Documents/Freedom%20revises%20estimate.pdf (February 7, 2017).

Freedom Industries, Inc. Investigation Report May 2017

126

APPENDIX B: FREEDOM OFFICIALS As a result of the release of the mixture containing Crude MCHM and PPH, stripped into the Elk River, six Freedom officials were charged with criminal violations. Table 12 lists the charges to which each individual pleaded guilty. On February 4, 2016, Freedom was issued a $900,000 criminal fine for three violations even though the company had filed for bankruptcy in 2014.505 Table 12. Summary of Freedom Fines and Charges Freedom Official Sentencing Fines Charges President506 30 Days in Jail $20,000 1. Negligent discharge of a pollutant

  1. Unlawful discharge of refuse

matter into navigable water

  1. Negligent violation of permit

condition Former Shareholder and Former President507 30 Days in Jail $20,000 1. Unlawful discharge of refuse matter into navigable water

  1. Negligent violation of permit

Condition Former Shareholder and Former Vice President508 3 Years of Probation $20,000 1. Unlawful discharge of refuse matter into navigable water Former Shareholder and Former Treasurer-Secretary509 3 Years of Probation $20,000 1. Unlawful discharge of refuse matter into navigable water

Operations Manager510 3 Years of Probation $2,500

  1. Negligent discharge of a

pollutant Environmental Manager511 3 Years of Probation $10,000 1. Negligent discharge of a pollutant Total

$92,500

505 Freedom Industries and Former Freedom Industries Plant Manager Sentenced for Roles in Chemical Spill. February 4, 2016. https://www.justice.gov/usao-sdwv/pr/freedom-industries-and-former-freedom-industries- plant-manager-sentenced-roles-chemical (September 15, 2016). 506 United States v. Gary Southern, No. 2: 14-cr-00264-4, Dkt. No. 296 (S.D.W.Va.). 507 United States v. Dennis Farrell, No. 2: 14-cr-00264-1, Dkt. No. 281 (S.D.W.Va.). 508 United States v. Charles Herzing, No. 2:14-cr-00264-3, Dkt. No. 260 (S .D.W.Va.). 509 United States v. William Tis, No. 2:14-cr-00264-2, Dkt. No. 277 (S.D.W.Va.). 510 United States v. Michael Burdette, No. 2:14-cr-00276, Dkt. No. 43 (S.D.W.Va.). 511 United States v. Robert Reynolds, No. 2:14-cr-00277, Dkt. No. 42 (S.D.W.Va.).

Freedom Industries, Inc. Investigation Report May 2017

127

APPENDIX C: LEAKING PIPES AND WATER MAIN BREAKS The American Society of Civil Engineers (ASCE) estimated that more than 1 million miles of water mains are in place in the United States and the condition of many of these pipes is unknown, largely due to pipes being located underground. Aging infrastructure poses a challenge in maintaining pipelines as many of these pipes were installed in the mid-1800s. In 2013, ASCE estimated 240,000 water main breaks per year and EPA estimates that approximately 4,000 to 5,000 miles of drinking water mains are replaced annually.512 ASCE also reports that up to $1.3 trillion in investment could be required for water and wastewater infrastructure in the United States before 2035.513 WVAW was the first water system in West Virginia to use electronic devices to locate and pinpoint underground leaks; however, even with the use of leak detection equipment and technology, WVAW continues to experience some level of “unaccounted-for water.”514 In WVAW’s 2016 Source Water Protection Plan, WVAW estimated 3,112,781,000 gallons of total unaccounted for water in 2015. In addition, an estimated 1,136,839,000 gallons of water was lost from main leaks. Water mains often experience breaks, introducing potential contaminants to the public drinking water that is supplied through these mains. When this occurs, water utilities issue Boil Water Notices or Do Not Use notices depending on the severity of the potential contamination. As a result of the Freedom incident, WVAW issued a DNU; however, it was not as a result of a leaking pipe or water main break.

512 American Society of Civil Engineers. 2013 Report Card for America’s Infrastructure. 2013. http://www.infrastructurereportcard.org/a/#p/drinking-water/conditions-and-capacity (September 28, 2016). 513 American Water. Corporate Social Responsibility Report 2013-2014. American Water: New Jersey. 2015. 514 Public Service Commission. Case No. 06-0597-W-PC. November 21, 2006, p. 19. http://www.psc.state.wv.us/scripts/webdocket/ViewDocument.cfm?CaseActivityID=197353&NotType='WebDo cket' (September 28, 2016).

Freedom Industries, Inc. Investigation Report May 2017

128

APPENDIX D: TOXICOLOGY

Toxicology is the study of adverse effects of chemicals on living organisms.515 Toxicity tests are conducted on laboratory animals to ascertain the toxic effects of chemicals and their applicability to humans. When determining the effects of a chemical toxicological tests examine the dose response relationship. Lethal dose 50 (LD50), is a threshold used to determine the lethal effect of a toxic agent on the median or 50% of the population tested. Two main principles guide all animal studies: “(1) the effects produced by a compound in laboratory animals, when properly quantified, are applicable to humans, and (2) the exposure of experimental animals to toxic agents in high doses is a necessary and valid method of discovering possible hazards in humans because of the incidence of an effect in a population is greater as the dose or exposure increases.”516 Toxicity studies are not designed to characterize whether a chemical is safe but to determine the effects it can produce.517

Various types of toxicological studies exist to assess a chemical’s toxicity. When the effects of a new chemical are being analyzed, the first types of studies conducted are acute toxicity studies followed by subchronic and chronic studies (see Table 13). The study types are described below. Table 13. Typical Duration of Toxicological Studies

An acute toxicity study is the first type of toxicity test performed on a new chemical. Studies may use more than one route of exposure (oral or the intended route of exposure) based on knowledge of the intended use or exposure profile. Animals are given a one-time dose and monitored for a 14-day period. Acute toxicity studies establish the LD50 dose, and other clinical effects of the chemical, establish whether the toxic response is reversible and provides baseline guidance on ranges of response at different doses for other studies. Acute dermal and inhalation studies are a type of acute toxicity studies that are conducted if substantial dermal and inhalation exposures are expected. In a dermal study, the site of exposure on the animal is shaved and a high dose of the chemical is applied 24 hours, removed and then followed by an observation period of 14 days, whereas in an inhalation study the exposure to the chemical occurs for 6 hours. Significant information is obtained through clinical observations and postmortem examination of animals rather than the LD50 value in acute toxicity studies.

Subacute toxicity studies help to understand the toxicity of a chemical after repeated administration usually over 28 days. Subchronic exposure tests the chemical for 90 days to establish a lowest observed adverse effect level, establish a no observed adverse effect level and examine the specific organ(s) affected by the chemical after repeated administration. This type of study is usually conducted in four

515 Klaassen, C. D.; Watkins, J. B. III. Casarett & Doull’s Essentials of Toxicology; McGraw-Hill: New York, 2003. 516 Ibid. 517 Ibid. Study Typical Duration Acute <24 hours Subacute <30 days Subchronic <90 days Chronic

90 days

Freedom Industries, Inc. Investigation Report May 2017

129

groups of ten animals each (male and female) using three doses – a high dose, an intermediate dose and a low dose (producing no toxic effect) – and an untreated control. Animals are observed daily for signs of toxicity. Further analysis is conducted after termination.

Freedom Industries, Inc. Investigation Report May 2017

130

APPENDIX E: SPILL PREVENTION, CONTROL AND COUNTERMEASURE

When enacted, the CWA gave the President of the United States the authority to prevent, control and mitigate the discharge of oil and hazardous substances into certain domestic waterways. The President then delegated his authority to EPA. EPA developed its SPCC regulations pursuant to this authority; however, in doing so, it limited the scope of its regulations to pertain only to oil, even though EPA had the authority under the CWA to promulgate associated regulations for hazardous substances.518 As a result, for over 40 years, EPA’s SPCC program has applied only to oil—that is, until approval of a February 2016 settlement agreement whereby EPA agreed to begin rulemaking to include hazardous substances in its SPCC regulations. This settlement agreement will be discussed at the end of this section. Generally, SPCC regulations strive to prevent oil from entering navigable waters through the prevention, control and mitigation of oil spills.519 This is achieved primarily through the development of SPCC plans.520 SPCC plans are required for facilities that store oil and oil-containing products exceeding certain capacity thresholds where there is a possibility that an oil spill would reach a navigable water.521 Specifically, any facility that maintains a total aboveground oil storage capacity of greater than 1,320 gallons, or a total underground oil storage capacity of greater than 42,000 gallons, where there is a reasonable potential for a discharge to reach navigable waters, is subject to SPCC regulatory requirements.522 Aboveground storage containers with a capacity of 55 gallons or more are included in the aboveground capacity threshold calculation.523 Certain facilities, tanks, containers, materials, equipment

518 33 U.S.C. § 1321(b)(2)(A). 519 EPA. Spill Prevention, Control, and Countermeasure (SPCC) Regulation, 40 CFR part 112: A Facility Owner/Operator’s Guide to Oil Pollution Prevention. https://www.epa.gov/sites/production/files/documents/spccbluebroch.pdf (February 7, 2017). The SPCC rule’s definition of oil derives from CWA § 311(a)(1), which defines oil as “oil of any kind or in any form, including, but not limited to, petroleum, fuel oil, sludge, oil refuse, and oil mixed with wastes other than dredged spoil.” 520 EPA. Spill Prevention, Control, and Countermeasure (SPCC) Regulation, 40 CFR part 112: A Facility Owner/Operator’s Guide to Oil Pollution Prevention. https://www.epa.gov/sites/production/files/documents/spccbluebroch.pdf (February 7, 2017). SPCC plans are not required to be submitted to EPA; rather, they must be kept onsite. 521 Ibid. 522 Ibid; 40 C.F.R. pt. 112.1. 523 EPA. Spill Prevention, Control, and Countermeasure (SPCC) Regulation, 40 CFR part 112: A Facility Owner/Operator’s Guide to Oil Pollution Prevention. https://www.epa.gov/sites/production/files/documents/spccbluebroch.pdf (February 7, 2017).

Freedom Industries, Inc. Investigation Report May 2017

131

and lines/piping are exempted.524 When calculating the total storage capacity of the facility, exempted oil containers and oil equipment should not be included.525 SPCC plans must clearly address the following: (1) operating procedures to prevent oil spills, (2) control measures to prevent a spill from reaching navigable waters, and (3) countermeasures to contain, clean up and mitigate the effects of an oil spill that reaches navigable waters.526 The plans must be facility- specific.527 As such, development of an SPCC plan requires detailed knowledge of the facility, including the location and capacity of oil-based storage, and the potential effects an oil spill might have on the area, environment and natural resources.528 SPCC plans must include certain standard elements to ensure compliance with SPCC regulations.529 Important elements of an SPCC plan include the following:

  1. Facility diagram and description of the facility.
  2. Oil discharge predictions.
  3. Appropriate secondary containment or diversionary structures.
  4. Facility drainage.
  5. Site security.
  6. Facility inspections.
  7. Requirements for bulk storage containers including inspections, overfill and integrity testing

requirements.

  1. Transfer procedures and equipment (including piping).
  2. Requirements for qualified oil-filled operational equipment.
  3. Loading/unloading rack requirements and procedures for tank cars and tank trucks.
  4. Brittle fracture evaluations for aboveground field constructed containers.

524 Specifically, EPA exempts the following: (1) any facility where the completely buried oil storage capacity is 42,000 gallons or less and the aggregate aboveground oil storage capacity is 1,320 gallons or less; (2) completely buried oil tanks and associated piping and equipment that are subject to all of the technical requirements under 40 C.F.R. pt. 280 or 281; (3) underground oil storage tanks, including below-grade vaulted tanks that supply emergency diesel generators at a nuclear power generation facility licensed by the Nuclear Regulatory Commission (NRC) and subject to any NRC provision regarding design and quality criteria, including but not limited to 10 C.F.R. pt. 50; (4) permanently closed oil containers; (5) any container with an oil storage capacity less than 55 gallons; (6) any facility or part thereof used exclusively for wastewater treatment; (7) motive power oil containers; (8) hot-mix asphalt or any hot-mix asphalt container; (9) containers storing heating oil used solely at a single-family residence; (10) pesticide application equipment or related mix containers (with adjuvant oil); (11) intra-facility oil gathering lines subject to the regulatory requirements of 49 C.F.R. pt. 192 or 195; and (12) any milk and milk product container and associated piping and appurtenance. 40 C.F.R. pt. 112.1(d); EPA. Office of Emergency Management. SPCC Guidance for Regional Inspectors. Chapter 2 SPCC Rule Applicability. December 16, 2013. https://www.epa.gov/sites/production/files/2014- 04/documents/2_applicability_2014.pdf (February 7, 2017). 525 40 C.F.R. pt. 112.1(d); EPA. Office of Emergency Management. SPCC Guidance for Regional Inspectors. Chapter 2 SPCC Rule Applicability. December 16, 2013. https://www.epa.gov/sites/production/files/2014- 04/documents/2_applicability_2014.pdf (February 7, 2017). 526 EPA. Spill Prevention, Control, and Countermeasure (SPCC) Regulation, 40 CFR part 112: A Facility Owner/Operator’s Guide to Oil Pollution Prevention. https://www.epa.gov/sites/production/files/documents/spccbluebroch.pdf (February 7, 2017). 527 Ibid. 528 Ibid. 529 Ibid.

Freedom Industries, Inc. Investigation Report May 2017

132

owner/operator).530 When the facility was owned and operated by Pennzoil prior to Freedom, it was a facility known to EPA Region 3, meaning it had been inspected and had an SPCC plan in place. According to EPA Region 3 records, when Freedom took over, it was no longer storing oil, and thus was no longer subject to SPCC regulations. However, when EPA analyzed a sample of a substance that Freedom called “fatty acid” post- incident, EPA determined through laboratory analysis that the fatty acid substance was classified as a type of oil that should have been covered by an SPCC plan. Freedom failed, however, to develop, implement, and obtain PE certification of such a plan after acquiring the site from ERT. The Freedom spill highlights the fact that EPA has not yet issued regulations under SPCC that apply to hazardous substances. On July 21, 2015, the Natural Resources Defense Council (NRDC) filed a complaint on behalf of the Environmental Justice Health Alliance for Chemical Policy Reform (EJHA) and People Concerned About Chemical Safety against EPA in the U.S. District Court for the Southern District of New York, alleging that EPA had failed to prevent hazardous substance spills from industrial facilities, including ASTs.531 The complaint set forth that, in 1978, EPA proposed hazardous substance spill regulations that would have applied to onshore facilities operating under NPDES permits, and that EPA announced anticipating the proposal of such regulations in the near future, but that EPA never finalized its proposed regulations. NRDC sought a declaration that EPA delayed initiation of the rulemaking process for hazardous substance spill regulations unreasonably, as well as an injunction ordering EPA to begin the rulemaking process without delay, setting an expeditious, enforceable schedule for EPA to follow. EPA and NRDC ultimately decide to settle and on February 16, 2016, the United States District Court for the Southern District of New York filed a consent decree, providing the details of their settlement.532 The settlement detailed in the consent decree requires EPA to begin a rulemaking process immediately and to finalize spill prevention rules for hazardous substances within a set time frame.533 Within this time frame, EPA agreed to follow specific deadlines for certain rulemaking milestones.534 For example, no later than 18 months after entry of the consent decree, EPA agreed to sign (and within 15 days thereafter transmit to the Office of the Federal Register) a notice of proposed rulemaking pertaining to the issuance of the

530 Ibid. 531 Environmental Justice Health Alliance for Chemical Policy Reform et al. v. U.S. Environmental Protection Agency, et al., No. 1:15-cv-05705 (S.D.N.Y. July 21, 2015); E. Lynn Grayson. Court Orders New EPA Spill Prevention Rules. Lexology. February 18, 2016. http://www.lexology.com/library/detail.aspx?g=4ce2702e-700b- 4a6c-b630-3ccae05b459c. 532 Environmental Justice Health Alliance for Chemical Policy Reform et al. v. U.S. Environmental Protection Agency, et al., No. 1:15-cv-05705-SAS (S.D.N.Y. February 16, 2016). 533 Ibid. 534 Ibid.

Freedom Industries, Inc. Investigation Report May 2017

133

hazardous substance regulations, unless, if no later than 60 days after entry of the consent decree, EPA notified NRDC of its intent to publish a Federal Register notice regarding the collection of information.535 If EPA notifies NRDC of this intent, the deadline for signing a notice of proposed rulemaking is extended to 28 months after entry of the consent decree.536 The consent decree also states that, no later than 14 months after publication of the proposed hazardous substance regulations, EPA will sign (and within 15 days thereafter transmit to the Office of the Federal Register) a notice taking final action following notice and comment rulemaking pertaining to the issuance of hazardous substance regulations.537

EPA has notified NRDC of its intent to collect more information and is currently drafting, along with NRDC, an Information Collection Request (ICR) to learn more about facilities that store hazardous substances. In part, this effort is meant to provide EPA with more information on the pertinent issues at such facilities so that EPA can create a set of regulations that does not conflict with existing requirements or standards. EPA anticipates sending this ICR primarily to facilities, but possibly to states as well. EPA is considering sending the ICR to states because some states already have regulations for ASTs that contain hazardous substances and, again, does not want to create a conflicting set of regulations. Because of the timely nature of EPA’s notification to NRDC, the proposed rule and final rule publication deadlines will be postponed to June 2018 and August 2019, respectively.

Before filing the consent decree, EPA wrote a Letter of Intent to NRDC on February 11, 2016, indicating its intention to provide biannual updates to NRDC, EJHA, PCACS and the public on its progress in the development of the proposed rule and any subsequent final rule.538 Additionally, EPA stated that it intends to hold in 2016 a minimum of three opportunities, called community stakeholder sessions, for community stakeholders to provide their views on topics relevant to the prevention of discharges of hazardous substances, and the containment of such discharges, from onshore facilities, including methodologies and technologies for preventing such discharges.539 These sessions may take the form of roundtable meetings, audio/visual conferences or similar methods of engagement.540 Tentatively, one of these community stakeholder sessions will be held in West Virginia.541 EPA stated that it intends to post a publicly available summary document reflecting information gathered from these sessions by the end of 2016.542 According to the letter, EPA intends to inform the public of the aforementioned biannual updates and community stakeholder sessions by posting the information on EPA’s website.543

Roughly 330 hazardous substances are listed under the CWA.544 These substances have associated reportable quantities under CERCLA.545 While greater coverage for hazardous substances under the

535 Ibid. 536 Ibid. 537 Ibid. 538 EPA Office of Solid Waste and Emergency Response. Letter of Intent to NRDC. EPA: Washington, DC. February 11, 2016. 539 Ibid. 540 Ibid. 541 Ibid. 542 Ibid. 543 Ibid. 544 40 C.F.R. § 116 (2015). 545 40 C.F.R. § 117 (2015).

Freedom Industries, Inc. Investigation Report May 2017

134

February 2016 settlement agreement expands the applicability of SPCC regulations, neither the mixture involved in the Freedom spill or its six components are listed as a hazardous substance under the CWA and thus will not be covered under the hazardous substances regulations. As such, even if the hazardous substances regulations had been in effect before the incident, they alone would not have triggered application of the regulations to Freedom. Nonetheless, in part because Freedom did contain oil at its Etowah facility in sufficient quantities to trigger application of SPCC, Freedom should have done more to prevent potential spills.

FD06474 | 2015_US_CSB_ExxonMobil_Torrance_Refinery_ESP_Explosion_Investigation_Report.pdf

分类:06_境外及港澳台调查报告 | 年份:2015 | 地域: | 严重程度: | 场所: | 起火原因: | 来源格式:pdf

U. S. Chemical Safety and Hazard Investigation Board RECOMMENDATIONS STATUS CHANGE SUMMARY

Recommendation Text:

Facilitate forum(s)—attended by fluid catalytic cracking unit engineers and other relevant personnel from American Fuel and Petrochemical Manufacturers member companies—to discuss the causal factors of the February 18, 2015 ExxonMobil Torrance refinery incident. Encourage participants to share topics such as design, maintenance, and procedural practices that can prevent a similar incident. Topics of discussion should include: (1) Detection of hydrocarbons flowing to an ESP; (2) Isolation strategies to prevent mixing of air and hydrocarbons during standby operations; (3) Safe operation during unit standby; (4) Use of SCSVs as a safeguard during standby operations; (5) Use of reactor steam as a safeguard during standby operations; (6) Measuring reactor / main column differential pressure during standby operations; (7) ESP explosion safeguards; and (8) Preventing ESP explosions. Create documentation that creates institutional knowledge of the information discussed in the forum(s), and share with the member companies and forum attendees.

Board Status Change Decision:

A. Rationale for Recommendation

On February 18, 2015, an explosion occurred in the ExxonMobil Torrance, California, refinery’s Electrostatic Precipitator (ESP); a pollution control device in the fluid catalytic cracking (FCC) unit that removes catalyst particles using charged plates that produce sparks during normal operation. The incident occurred when ExxonMobil was attempting to isolate equipment for maintenance while the unit was in an idle mode of operation. Preparations for the maintenance activity caused a pressure deviation that allowed hydrocarbons to backflow through the process and ignite in the ESP.

As a result, the CSB made a recommendation to American Fuel and Petrochemical Manufacturers (AFPM) to set up forums for its members to discuss the causal factors of this incident to prevent similar incidents.

B. Response to the Recommendation In a letter dated August 3, 2017, AFPM provided the CSB with dates of various forums in which fluid catalytic cracking unit engineers and other relevant personnel from American Fuel and Petrochemical Manufacturers member companies were invited to discuss the causal factors of the February 18, 2015, Report: ExxonMobil Torrance Refinery Explosion Recommendation Number: 2015-02-I-CA-R10 Date Issued: May 3, 2017 Recipient: American Fuel and Petrochemical Manufacturers New Status: Closed – Acceptable Action Date of Status Change: September 25, 2017

ExxonMobil Torrance refinery incident and encouraged to share topics such as design, maintenance, and procedural practices that can prevent a similar incident. One was held on May 10, 2017, in which the CSB’s Lead Investigator for this incident presented his findings. Additionally, there are future event dates, one of which reoccurs every 2 years. C. Board Analysis and Decision As a result of the above information, the Board voted to change the status of CSB Recommendation No. 2015-02-I-CA-R10 to: “Closed – Acceptable Action.”

FD06475 | 2015_美国_CSB_DuPont_La_Porte有毒化学品泄漏_公开会议记录稿.pdf

分类:06_境外及港澳台调查报告 | 年份:2015 | 地域: | 严重程度: | 场所:化工/石化 | 起火原因:燃气/爆炸 | 来源格式:pdf

(202) 234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. 1 U.S. CHEMICAL SAFETY BOARD

BUSINESS MEETING

WEDNESDAY, JULY 22, 2015

U.S. CHEMICAL SAFETY BOARD MEMBERS PRESENT: RICK ENGLER, Member, U.S. Chemical Safety Board MANNY EHRLICH, JR., Member, U.S. Chemical Safety Board STAFF PRESENT: JOHNNIE BANKS, Team Lead, Investigator DON HOLMSTROM, Director, Western Regional Office MARK KASZNIAK, Senior Recommendations Specialist KARA WENZEL, Acting General Counsel CHERYL MACKENZIE, Team Lead, Investigator DAN TILLEMA, Team Lead, Investigator VERONICA TINNEY, Recommendations Specialist This transcript produced from audio provided by the U.S. Chemical Safety Board.

(202) 234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. 2 T-A-B-L-E O-F C-O-N-T-E-N-T-S Welcome and Introductions By Rick Engler and Manny Ehrlich . . . . . . 3 CSB Investigations Update ExxonMobil by Don Holmstrom. . . . . . . . .11 West Fertilizer by Johnnie Banks . . . . . .16 Macondo by Cheryl Mackenzie. . . . . . . . .21 Caribbean Petroleum Investigation. . . . . . . . .21 BP Incident Reporting System Recommendation By Mark Kaszniak . . . . . . . . . . . . . .36 Public Comment - BP Incident Reporting System Recommendation . . . . . . . . . . . . . . . . . .45 Investigation Update on DuPont (La Porte, Texas) By Dan Tillema . . . . . . . . . . . . . . .50 Public Comment - DuPont (La Porte, Texas). . . . .71 California Process Safety Management Recommendation By Veronica Tinney and Don Holmstrom . . . 102 Laboratory Safety Guideline Recommendation to American Chemical Society By Veronica Tinney . . . . . . . . . . . . 116 Future Business Meeting Schedule Changes By Rick Engler and Manny Ehrlich . . . . . 122 Public Comment - Agenda Items. . . . . . . . . . 125 Closing Statements By Rick Engler and Manny Ehrlich . . . . . 132

(202) 234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. 3 1 P-R-O-C-E-E-D-I-N-G-S 2 (9:30 a.m.) 3 OPERATOR: Welcome to the CSB business 4 meeting. My name is Chris and I will be your 5 operator for today's call. At this time, all 6 participants are in a listen-only mode. 7 Later we will conduct a question and 8 answer session. Please note that this conference 9 is being recorded. I will now turn the call over 10 to Board Member Mr. Rick Engler. Mr. Engler, you 11 may begin. 12 MEMBER ENGLER: Good morning and 13 welcome to the CSB offices. My name is Rick 14 Engler and I am the Board Member presiding over 15 this meeting. I would also like to introduce my 16 colleague on the Board, Manny Ehrlich. Also with 17 us is Kara Wenzel, CSB's Acting General Counsel. 18 Since we don't have a huge group, 19 could we quickly go around the room and just get 20 a sense of who is here? Just name and 21 affiliation starting with you. 22

(202) 234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. 4 1 MS. VASSALLI: Katie Vassalli, the 2 International Liquid Terminals Association. 3 MS. PARASRAM: Vidisha Parasram, U.S. 4 Chemical Safety Board. 5 MR. SUTTON: Ian Sutton, Sutton 6 Technical Books. 7 MR. CRIMAUDO: Steve Crimaudo, API, 8 American Petroleum Institute. 9 MS. TINNEY: I'm Veronica Tinney, also 10 with the CSB. 11 MS. SANDLER: Carla Sandler, King 12 Support (phonetic). I help companies that need 13 to find buyers. So I write their solicitation. 14 MS. SWETT: Laura Swett, ASPM. 15 MS. HAASE: Karen Haase, American 16 Chemistry Council. 17 MR. SHEPPARD: David Sheppard, ATF. 18 MR. HEENAN: Dan Heenan, ATF. 19 MS. MCFARLAND: Krista McFarland 20 (phonetic), WilmerHale 21 MS. COBREN: Marcy Cobran (phonetic), 22 O'Melveny and Myers.

(202) 234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. 5 1 MR. PRILLAMAN: Walter Prillaman, 2 Dupont employee and also Local 900C Safety 3 Officer. 4 MR. MORAWETZ: John Morawetz, 5 International Chemical Workers Union. 6 MR. DOBBIN: Denny Dobbin, Society for 7 Occupational and Environmental Health. 8 MR. FIORUCCI: Lou Fiorucci, Fiorucci 9 Consulting. 10 MS. FLANAGAN: Susan Flanagan, 11 Institute of Makers of Explosives. 12 MR. DUDZIG: Rob Dudzig, Debs-Jones- 13 Douglass Institute. 14 MR. DRANEY: Ross Draney with 15 RedGuard. 16 MS. FENDLEY: Anna Fendley, United 17 Steelworkers. 18 MR. PAULSON: Glenn Paulson of George 19 Washington University. 20 MS. MCCORMICK: Amy McCormick, CSB. 21 MR. GREEN: Lee Green (phonetic) with 22 Katten.

(202) 234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. 6 1 MR. FARLEY: Mark Farley with Katten. 2 MEMBER ENGLER: Thank you. Since a 3 quorum of the Board given the current Board 4 makeup is two members, we have a quorum today. 5 Today's gathering constitutes a public meeting of 6 the Board under the Sunshine Act rules and was 7 duly announced in the Federal Register. 8 Before we get started, I would like to 9 address some housekeeping items first. In the 10 event of an emergency, please exit out the front 11 entrance and down the stairs to the lobby. Our 12 gathering point is on the corner of Pennsylvania 13 and 22nd Street. 14 The restrooms are in the hallway on 15 this floor. There are sign up sheets outside 16 this room if you would like to make a comment. 17 Cell phones, please mute them. For those calling 18 in to the meeting, please mute your phone. 19 During the comment sessions, we will 20 give those on the phone an opportunity to speak. 21 Please limit your verbal comments to three 22 minutes. You can of course submit additional

(202) 234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. 7 1 written comments. 2 Today's meeting focuses on core 3 mission work of the CSB. I assume everyone has 4 picked up a copy of the agenda that's been out on 5 the table. We will hear reports on some of our 6 important investigations and recommendations, 7 vote for plans at this time on the three items 8 noted on the written agenda that you should all 9 have. 10 I want to give you all a heads up that 11 there will be a motion at the end of the meeting 12 in case you're not staying until the end, to 13 alter the meeting date and also a time change for 14 future meetings. 15 There are three opportunities for 16 public comment. The first two are focused on the 17 items that we will have discussed immediately 18 prior. The last opportunity for public comment 19 at the end of the meeting is for any other 20 comments that the public may wish to make. 21 I'd also like to point out to any of 22 the media representatives on the telephone that

(202) 234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. 8 1 the Dupont La Porte update prepared by Dan 2 Tillema and our Denver office is now on the 3 website and you can view it there. 4 So the first item on the agenda for 5 today's meeting is an investigation update. 6 First I'd like to introduce Don Holmstrom, 7 Director of the Western Regional Office. I'm 8 sorry, Manny I apologize, I'm rushing along. 9 Manny, do you have an opening statement? 10 MEMBER EHRLICH: I do. Good morning 11 and thank you all for coming. I was informed 12 that some of the members of the families from La 13 Porte, Texas were going to be here, the Tisnados 14 and Lynette Soto. And it doesn't, I haven't 15 heard them or seen them. On behalf of myself and 16 the Board, I want to extend our sincerest 17 condolences to them and their families. I'll 18 have further thoughts about that later on in the 19 meeting. 20 I appreciate the efforts by the CSB 21 staff to prepare for today's business meeting and 22 I appreciate everyone's attendance. This is my

(202) 234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. 9 1 first public meeting since returning from medical 2 leave in June and since the departure from the 3 Board of former member Griffon. I'm happy to be 4 back and to be in much better health, I can walk. 5 There is much important business 6 before the agency. We have a draft report on the 7 Caribbean Petroleum explosion that occurred in 8 Puerto Rico in 2009. Since releasing the draft 9 last month, we received some significant 10 stakeholder comments which I look forward to 11 reviewing today. 12 It was important that this report be 13 completed and include realistic safety 14 recommendations that can be applied by industry. 15 The catastrophic incident in Puerto Rico in a 16 2005 explosion at the Buncefield terminal and the 17 U.K. underscored the dangers from large gasoline 18 release and vapor cloud emission. 19 I hope all companies in the sector are 20 already taking the opportunity to study the draft 21 report and the video that was released last month 22 and are reviewing the safety of their gasoline

(202) 234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. 10 1 storage tanks. 2 It is no secret that the CSB is facing 3 a very challenging governance situation currently 4 with only two sitting members, three Board vacant 5 seats, and no confirmed Chair. I pledge to the 6 agency and to you, I stand ready to work 7 cooperatively with Board Member Engler to 8 navigate this difficult situation. 9 We offered a power sharing agreement 10 under which Mr. Engler and I would share 11 responsibility for day to day operations. My 12 background running chemical plants and my 13 practical management experience is certainly 14 needed here. 15 Earlier this year, I toured the DuPont 16 pesticide plant in La Porte, Texas. That plant 17 was the site of a large release of toxic methyl 18 mercaptan November 14th, an incident that took 19 four lives. 20 During my visit to La Porte, I 21 received a detailed briefing from the 22 investigative team and was able to observe the

(202) 234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. 11 1 building where the workers died during a 2 maintenance operation on the process vent system. 3 You'll hear more on this issue today. 4 I believe the team has important 5 findings about why this tragic incident occurred 6 and has also prepared certain possible 7 recommendations to improve the safety of the 8 facility and to protect workers when production 9 is resumed. 10 I would like these draft findings and 11 recommendations to receive prompt consideration 12 by the Board and to be available to the workforce 13 and the public. Thank you and I look forward to 14 today's meeting. 15 MEMBER ENGLER: Thank you Member 16 Ehrlich. Apologies for rushing ahead. 17 MEMBER EHRLICH: Not a problem. 18 MEMBER ENGLER: With that, I'd like to 19 introduce a panel to give a CSB investigations 20 update beginning with Don Holmstrom. 21 MR. HOLMSTROM: Thank you Board Member 22 Ehrlich, appreciate that. There are actually

(202) 234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. 12 1 three statements from the Western Regional Office 2 that we'll be discussing today. I'll be talking 3 about the ExxonMobil investigation and Torrance 4 refinery in California. 5 The lead investigator, Cheryl 6 MacKenzie will shortly be talking about the final 7 two volumes of the Macondo investigation. And 8 Dan Tillema, also from the WRO, will be talking 9 about preliminary findings and analysis from the 10 DuPont La Porte, Texas investigation. 11 On February 18, 2015, there was an 12 explosion in the fluidized catalytic cracker, 13 also referred to as the FCC at the ExxonMobil 14 refinery in Torrance, California. The explosion 15 occurred in a piece of equipment called the 16 ElectroStatic Precipitator or ESP. 17 The blast released FCC catalyst into 18 the surrounding Torrance residential area, 19 exposing numerous members of the community to the 20 catalyst dust. At least four refinery workers 21 were injured in the explosion and subsequent 22 evacuation.

(202) 234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. 13 1 Debris from the exploding ESP damaged 2 nearby process units causing several leaks and 3 fires. The FCC unit converts long chain 4 hydrocarbon such gas oils into shorter 5 hydrocarbons that are blended into gasoline 6 products. ESP is a pollution control device 7 that, at that refinery, was installed in 1999, 8 excuse me, 2009 to remove fine catalyst dust from 9 the FCC process. 10 The high voltages present in the FCC 11 during normal operation generate ignition 12 sources. The ESP is not designed to handle 13 flammable atmospheres. ESPs are commonly used to 14 remove particulate dust, pollution control, and 15 various processes. 16 Soon after the incident, the CSB 17 deployed and an investigation team was sent to 18 the refinery. The investigation team has carried 19 out multiple investigative activities including a 20 number of interviews of operators, management, 21 emergency responders, eye witnesses to the 22 incident, as well as receiving thousands of

(202) 234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. 14 1 documents that have been reviewed thus far. 2 We have taken part in multiple 3 catalyst and hydrocarbon sample collection and 4 testing activities. We met with community 5 members offsite. We've hired contractors to 6 assist us in some of the technical analysis and 7 post incident review of equipment and some 8 modeling of what occurred. 9 We are generating, editing multiple 10 protocols to test equipment and the integrity of 11 various parts of the FCC unit including valves, 12 control systems, and analyzers. 13 The CSB investigation determined that 14 the explosion likely occurred when flammable 15 hydrocarbons within the FCC mixed with oxygen and 16 reached the electrostatic precipitator which 17 served as an ignition source. 18 ExxonMobil had numerous safety systems 19 in place to ensure that both flammables would not 20 reach the ESP and if flammables did reach the 21 ESP, it would be turned off automatically. All 22 of the safety systems put in place failed and

(202) 234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. 15 1 allowed the incident to occur. 2 These included failures to mechanical 3 integrity, hazard analysis, non-routine work 4 procedures, among others. The CSB investigation 5 team has identified a number of key issues that 6 are similar to issues identified in previous CSB 7 refinery investigations including the Chevron 8 investigation in Richmond, California. 9 As the investigation moved forward, 10 key issues such as the ones listed below have 11 continued to be analyzed. These include failure 12 to assess the effectiveness of safeguards during 13 a PHA as well as general failure to identify and 14 mitigate hazards. Work force involvement and 15 empowerment about safety concerns, a reluctance 16 to shut down units despite severe process upsets 17 and equipment failure, and mechanical integrity, 18 failure of equipment due to known damage 19 mechanisms. 20 The incident progress currently is, 21 we're undergoing a scoping process to identify 22 what key issues we're going to be undertaking in

(202) 234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. 16 1 the investigation, what type of product. A full 2 investigation report or some other product will 3 be generated from this investigation and that's 4 currently under internal review. That concludes 5 my presentation on ExxonMobil, thank you. 6 MEMBER ENGLER: Thank you. Next we'll 7 turn to Johnnie Banks, Supervisory Investigator 8 to discuss West Fertilizer and the Freedom 9 Industries investigation status. Johnnie? 10 MR. BANKS: Thank you Board Member 11 Engler and good morning everyone. I'll be 12 providing a real brief overview of the West and 13 Freedom investigations. 14 The West case initiated on April 17, 15 2013 with a tragic detonation of ammonium nitrate 16 at an ammonium nitrate storage facility where 17 there 15 fatalities. Twelve of those were 18 emergency responders, three from the public. 19 There were hundreds of injuries and significant 20 damage to homes, nursing homes, residences, and 21 the infrastructure. 22 Currently we are in the midst of

(202) 234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. 17 1 submitting the report for technical expert 2 review. We anticipate getting comments back from 3 that on or about July 25th of this year. And we 4 will resolve any comments that the experts 5 provide. 6 We're preparing to send the report to 7 counsel for West for confidential business 8 information review and comment. That process 9 would take about another week or so. The team is 10 continuing to work on the draft of the full 11 report with input from these previously mentioned 12 reviewers. 13 We're working to complete the report 14 and prepare for Board review and comment late 15 fiscal year '15 which would be September 30th of 16 this year or early fiscal year 2016, October 1st. 17

18 Prior to that, we'll be preparing 19 recommendations. We'll meet with the recipients 20 of these recommendations to ensure that they are, 21 the appropriate parties receive those 22 recommendations and that the recommendations are

(202) 234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. 18 1 appropriate. And then we'll also issue the 2 report for factual accuracy review from both 3 parties that would have the knowledge of whether 4 the facts that they didn't report are accurate. 5 The next case that I'll be providing 6 overview for is the Freedom Industries incident 7 which occurred on January 9, 2014. That was 8 where there was a failure of a tank that 9 contained methylcyclohexanemethanol or MCHM. The 10 release of this went to the river and affected 11 the water for 300,015 Charleston, West Virginia 12 area. 13 The team has been involved with this 14 investigation since January 13th of that year and 15 we're making progress on drafting the report. We 16 recently traveled to Charleston to conduct 17 interviews, follow up interviews and initial 18 interviews with parties that we had not 19 interviewed to date. 20 We toured the site and met with local 21 agencies that we've had contact with from the 22 very outset. We hope to initiate the Board

(202) 234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. 19 1 review for the full report in early fiscal year 2 2016 which would be October 1st. That includes 3 the report and obviously the eco-report, we're 4 here to encourage the passage of that as well. 5 MEMBER ENGLER: Thank you very much. 6 Next on the Macondo investigation, Cheryl 7 Mackenzie, the team lead who has been working 8 diligently on that. 9 MS. MACKENZIE: Thank you. A status 10 update, the final two volumes of the Macondo 11 investigation report are drafted and are in the 12 middle of our internal CSB review process. These 13 volumes are on the human organizational factors 14 that contributed to the incident as well as our 15 regulatory analysis. 16 The team received comments back from 17 the technical editor on Volume 3 this week and 18 we're incorporating any of those such edits. 19 We'll be getting Volume 3 to the Board this 20 Friday. Volume 4 is with the technical editor 21 now and will be going to the Board the following 22 Friday, the 31st.

(202) 234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. 20 1 After that, we have a number of 2 additional reviews which is what Investigator 3 Banks mentioned regarding stakeholder reviews, 4 recommendation recipients, et cetera. And we're 5 completing, the completion date for both volumes 6 is currently projected to be October 12th of this 7 year. We hope to release those volumes together 8 at a public meeting around that time. 9 MEMBER ENGLER: Great, thank you. 10 Member Ehrlich, do you have any questions for 11 folks concerning what was just reported on the 12 status of our investigations? 13 MEMBER EHRLICH: I do not, thank you 14 very much. 15 MEMBER ENGLER: Okay. We know you're 16 all working diligently on them and we look 17 forward to, as Board members, to having an 18 opportunity to review the latest drafts, provide 19 comments, and move forward on them. Thank you 20 for your work and of course for all the staff 21 that you work with that contribute to the core 22 mission of working on these critical reports.

(202) 234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. 21 1 Next on the agenda is discussion of 2 the Caribbean Petroleum investigation and I would 3 like to make an opening statement concerning 4 that. 5 The staff of the Chemical Safety Board 6 has finalized its report, which we will vote on 7 today, on the October 23, 2009 overfill incident 8 at the Caribbean Petroleum refinery in Bayamon, 9 Puerto Rico where a five million gallon capacity 10 above-ground storage tank overfilled while fuel 11 was being transferred from a tanker ship. 12 I thank the staff and particularly 13 Vidisha Parasram for her long and hard work on 14 this report. Thank you Vidisha. During the 15 overfill, gasoline spray from the tank 16 aerosolized forming a vapor cloud which pooled in 17 the secondary containment area where it leaked 18 through an open dike valve to the wastewater 19 treatment area and ignited. 20 The vapor cloud explosion led to 21 multiple tank fires that burned for two days. 22 Local community members were forced to evacuate

(202) 234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. 22 1 in the middle of the night. The explosion and 2 fires damaged 17 of 48 tanks at the facility, 3 caused three offsite injuries, and damaged or 4 destroyed approximately 300 homes nearby. The 5 magnitude of the incident caused President Obama 6 to declare a state of emergency. 7 The CSB found that lack of a robust 8 overfill prevention system with more than one 9 layer of protection as an independent or 10 redundant level alarm can lead to catastrophic 11 incidents. And that current safeguards 12 applicable to above-ground storage tanks do not 13 adequately protect the public from catastrophic 14 incidents that are using NFPA 704 Class 3 15 flammable liquids such as petroleum products. 16 Preventing future catastrophes 17 necessitates regulatory safeguards and industry 18 and consensus standards that require tank 19 terminal facilities to implement additional 20 layers of overflow protection, conduct a risk 21 assessment considering the proximity of 22 communities, and follow good engineering

(202) 234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. 23 1 practices. 2 The findings of the CAPECO 3 investigation led CSB to recommend that EPA and 4 OSHA determine the best regulatory standards to 5 require bulk above-ground storage facilities to 6 conduct risk assessments considering existing 7 populations in sensitive environments, the 8 complexity of site operations, the reliability of 9 the tank gauging system, and the rigor of gauging 10 operations. 11 To further minimize the potential of 12 catastrophic incidents such as CAPECO, in our 13 report being proposed today, the CSB asks the EPA 14 and OSHA to ensure that a tank's automatic 15 overflow prevention system be separate and 16 independent from the tank level control system 17 and follow good engineering practices. 18 In addition, the CSB recommends that 19 OSHA implement elements of this process safety 20 management standard that includes a mechanical 21 integrity program into the flammable and 22 combustible liquids standard. CSB investigative

(202) 234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. 24 1 findings identify the regulatory deficiencies 2 that contribute to this incident. 3 Thus, these recommendations for 4 safeguards were issued with the hope of 5 preventing future incidents such as Caribbean 6 Petroleum from occurring. I again thank the 7 staff for all their hard work in producing this 8 important report. 9 Through a written notation vote 10 process, I voted for this report and the 11 recommendations concerning this incident. The 12 notation item 2015-41 on July 6, 2015. On July 13 13, 2015 Member Ehrlich calendared this matter 14 for discussion at a public meeting. 15 And I just note that calendar items 16 now have to be brought up for discussion at 17 public meetings. They cannot be swept under the 18 rug anymore. This is something that's in our new 19 regulations that are now effective. That 20 basically makes the calendar motion an 21 opportunity for public discussion, debate, 22 transparency, et cetera. So it's perfectly

(202) 234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. 25 1 appropriate that the item was calendared for 2 discussion at this meeting today. 3 So I now make the following motions, 4 the Board hereby votes to adopt and release the 5 proposed final investigation report including the 6 proposed recommendations as the Board's report 7 and recommendations on the Caribbean Petroleum 8 incident as well as the accompanying video. I 9 now ask if there is a second for that motion. 10 FEMALE PARTICIPANT: Is it possible 11 for -- 12 MEMBER ENGLER: No. Just to back up 13 for a second, there's been extensive public input 14 into this report. We had a public meeting on it. 15 We extended the comment deadline. So at this 16 point, we're focusing on actually taking action 17 on the report. 18 Of course, if you have additional 19 comments to submit at this point, you can always 20 submit a statement to the public record. We have 21 an open public record process here so we're 22 always open to hearing comments on draft reports,

(202) 234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. 26 1 final reports, et cetera. 2 Do I hear a second? 3 Hearing no second, the motion failed. 4 Do you have statements that you would to -- 5 MEMBER EHRLICH: Yes I do. I wish to 6 have it known at the outset that the CAPECO 7 investigation team produced an excellent report 8 with important factual findings and did so with 9 very limited staffing and resources. For this 10 they are to be strongly commended. 11 I also commend the CSB Public Affairs 12 staff for another outstanding safety video 13 describing the causes of the CAPECO incident 14 which will greatly benefit the investigative 15 community. 16 I agree with the report's premise that 17 overfilling gasoline storage tanks is a serious 18 hazard that deserves a high level of attention 19 from industry. Both the 2009 CAPECO incident in 20 Puerto Rico and the 2005 Buncefield incident in 21 the U.K. demonstrate the potentially severe 22 consequences from gasoline vapor cloud

(202) 234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. 27 1 explosions. 2 Thankfully, gasoline tank incidents 3 since the 19 -- I'm sorry. Thankfully, gasoline 4 overfill incidents have been rare in the U.S. and 5 the report noted only a handful of (inaudible) 6 incidents since the 1970's. Fortunately, the 7 explosion in Puerto Rico caused no serious 8 injuries and it has been many years since a 9 gasoline tank overfill incident caused a fatality 10 in the U.S. 11 My vote was based on fundamental 12 philosophical disagreement with several of the 13 key recommendations in the draft report. 14 Specifically the recommendation for extensive new 15 regulations directed to the United States 16 Environmental Protection Agency and the United 17 States Occupational Safety and Health 18 Administration. 19 I believe these recommendations would 20 be burdensome for industry, would not reflect the 21 stated priorities of already overstretched 22 regulatory agencies, and do little to reduce the

(202) 234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. 28 1 risk to the public for any facilities like CAPECO 2 that fall far short of complying with existing 3 regulatory standards. 4 Their not having followed the existing 5 regulations would call into question the issue of 6 how they would adhere to stricter regulations. I 7 also believe that given the difficulty of getting 8 new federal regulations adopted, the CSB should 9 only recommend such regulations when absolutely 10 necessary. Doing otherwise simply dilutes our 11 very limited resources for recommendations 12 advocacy. 13 In suggesting that the EPA expand its 14 risk management program to encompass thousands of 15 terminals storing flammable liquids, NFPA Class 16 3, like gasoline, the draft report would greatly 17 expand a regulatory program that already lacks 18 sufficient staffing and resources to do effective 19 inspections and enforcement at major refining and 20 chemical manufacturing sites. 21 I am unique among the current members 22 and staff at the agency in having run industrial

(202) 234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. 29 1 chemical plants. And at one time I ran a 2 petroleum terminal in New Jersey that handled 3 products similar to CAPECO. There, however, the 4 similarity ended. At the terminal I ran, we were 5 extremely vigilant about the danger of an 6 overfill event. 7 And our standards and safeguards and 8 alarms received extensive and regular scrutiny 9 from regulatory agencies including the EPA, the 10 NJDP, the New Jersey Department of Environmental 11 Protection, and the United States Coast Guard. 12 Using the existing the rule book, that terminal 13 facility was held to an extremely high standard. 14 The draft report does an excellent job 15 documenting the fact that CAPECO, at the behest 16 of EPA and based on current regulations, 17 previously installed an electronic level control 18 system for its gasoline storage tanks. But then 19 unfortunately, allowed that system to fall into 20 serious disrepair. 21 CAPECO management continued operating 22 the facility right until the night of the

(202) 234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. 30 1 incident without a functioning tank level control 2 system that would meet existing EPA regulations. 3 As the EPA noted in its comments on the report, 4 the company also did not comply with existing 5 regulations to properly supervise the containment 6 dike valves to prevent the spread of any spilled 7 petroleum. 8 On the night of the incident, open 9 valves allowed the spread of the spilled gasoline 10 over a wide area and greatly increased the 11 incident severity. The lack of adherence to 12 current EPA regulations was a direct cause of 13 this incident. Had EPA regulations required 14 additional layers of protection on that gasoline 15 storage tank as suggested by the draft report, 16 there's no assurance that CAPECO would have 17 maintained these systems any more diligently. 18 As the EPA and others have pointed out 19 in public comments on the draft report, current 20 provisions of the Spill Prevention Control and 21 Countermeasures, SPCC rule, already require 22 companies to have continuous or fast response

(202) 234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. 31 1 tank level monitoring to prevent overfilling. 2 And to ensure the existence or design according 3 to good engineering practices and they are 4 regularly tested to ensure proper operation. 5 The EPA might best assist the 6 regulated community by providing additional 7 interpretation or values concerning the good 8 engineering practice a company should implement 9 to prevent overfills including references to the 10 appropriate and up to date NFPA, National Fire 11 Protection Association, and API, American 12 Petroleum Institute, consensus standards. 13 In light of the situation at CAPECO, 14 it would also be beneficial for the EPA to apply 15 additional resources to enforcing its existing 16 SPCC regulations, requirements, and to educating 17 the regulative community on effective 18 implementation. However, layering an additional 19 conflicting or duplicative regulations concerning 20 tank overfill prevention through the EPA risk 21 management program and/or the OSHA flammable 22 liquids standards, 29CFR1910106, it will simply

(202) 234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. 32 1 add cost and confusion to an already complex 2 system with little safety benefits. 3 It would also run contrary to the 4 approach directed by President Obama in several 5 Executive Orders that encourage agencies to 6 streamline and simplify regulatory approaches and 7 specify performance objectives rather than 8 specific compliance strategies. 9 My position in no way should be 10 construed to be a criticism of the staff that 11 prepared this report. They did an excellent job, 12 Vidisha and Adel (phonetic). I simply have 13 different life experiences and differing 14 perspective on how to address hazards like those 15 found at CAPECO. Thank you. 16 MEMBER ENGLER: Thank you for that 17 statement Mr. Ehrlich. I would like to respond. 18 First of all, the CSB is fundamentally a non- 19 regulatory agency. We don't propose regulations. 20 But if we think that regulations should be 21 considered, we have a duty and obligation to put 22 them forward for consideration, for further

(202) 234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. 33 1 debate, to go through the long process that 2 involves many, many steps before regulations 3 actually are adopted. 4 And not to propose where there are 5 clearly defined, non-duplicative, non-conflicting 6 safeguards, I see as a fundamental problem in an 7 approach to the way this agency should move 8 forward. We are not here to reflect other 9 agency's priorities frankly. If you look at the 10 statutes that establish the CSB, we're supposed 11 to look critically at OSHA, at EPA, and at other 12 entities and make recommendations about policies 13 that should be considered. 14 It doesn't say in our statues, in our 15 enabling statute or the legislative history which 16 I've read numerous times, P.S. consider other 17 agency priorities. Of course, that doesn't mean 18 we can't interact with them and we do interact 19 with them. 20 We send our recommendations in 21 advance, as part of the draft and consultation 22 process, to agencies to get their feedback. To

(202) 234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. 34 1 find out, are we off base? Can we make 2 alterations? Can we improve them? That process 3 was, in my view, thoroughly done with this 4 particular report. 5 Obviously, if we suggest things that 6 make no sense to an agency whatsoever, the 7 chances of them seriously considering such a 8 proposal are much reduced. But not to make a 9 proposal based on another agency's priorities is 10 frankly, would be a dereliction of duty for this 11 agency. 12 The argument that the proposal would 13 do little to reduce risks to the public is 14 fundamentally flawed. And the logical conclusion 15 of that is simply not to have safeguards because 16 after all, if there is one bad actor out there 17 who won't adhere to them and since it won't work, 18 we simply don't need such protections. It makes 19 no sense whatsoever to me. 20 It would actually be an argument for 21 abolishing existing regulatory protections 22 because some outlier didn't follow them. So I

(202) 234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. 35 1 find it deeply disturbing about what it portends 2 for the future reports that we have before us. 3 In cases such as West, where it's my 4 understanding that the State of Texas has, Mr. 5 Banks you can correct me if I'm stating it 6 incorrectly here, a new law that says ammonium 7 nitrate can't be stored within 30 feet of a 8 combustible or flammable area. 9 Now it seems to me that that may be 10 somehow inadequate as a preventive measure for 11 this problem. Does that mean that because there 12 is a philosophy of opposing regulatory 13 protections, that we should not as a Board 14 discuss the particular vaccuum of safeguards for 15 workers and communities? Not only in Texas, but 16 across the country. I think not. I'm deeply 17 disturbed by this vote today which means that the 18 report and the video will not be released in 19 final form. 20 And I intend to bring this up at a 21 subsequent Board meeting for further 22 consideration as soon as possible with the hope

(202) 234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. 36 1 that the Senate promptly, as soon as possible, 2 can confirm the additional Board members that 3 have been nominated who bring a commitment to 4 preventive measures, public health, worker 5 safety, and the core mission of this agency. 6 So I would like to move on, unless 7 there's any other comments from Mr. Ehrlich, to 8 the next agenda item. The next agenda items is - 9

10 motion that I made failed for lack of a second in 11 terms of the official record. Next on our agenda 12 is the BP Incident Reporting System 13 recommendation with a presentation by Mark 14 Kaszniak, our Senior Recommendations Specialist. 15 MR. KASZNIAK: Thank you Mr. Engler. 16 This recommendation was issued as a result of the 17 CSB BP Texas City refinery explosion in 2005 18 which was one of three recommendations issued to 19 BP corporate Board of Directors in the final 20 report that was released on March 20, 2007 at the 21 conclusion of that investigation at the public 22 meeting that was held in Texas City, Texas.

(202) 234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. 37 1 The CSB found in the report that the 2 BP lacked a sufficient reporting and learning 3 culture in its refinery and its organization. If 4 you would consult further details, you should 5 look at Section 10 of that report which is posted 6 on our website. 7 It briefly, the key elements that CSB 8 noted in this recommendation is that reporting 9 bad news in the BP organization was not 10 encouraged. That BP Texas City managers did not 11 effectively investigate accidents and take 12 appropriate correction action when those 13 accidents occured. 14 And that a corporate audit conducted 15 the year prior to the BP Texas City explosion 16 throughout the BP corporate structure revealed 17 that there were insufficient mechanisms for 18 disseminating information from previous incidents 19 in the BP organization in 35 of BP's group 20 business units. 21 So based on that recommendation, based 22 on those findings, the CSB issued the following

(202) 234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. 38 1 recommendation which I will read in its entirety 2 here. Is that to ensure and monitor that senior 3 executives implement an incident reporting 4 program throughout the refinery organization that 5 A, encourages the reporting of incidents without 6 fear of retaliation. 7 B, requires prompt corrective actions 8 based on incident reports and recommendations and 9 tracks closure of action items at the refinery 10 where the incident occurred and at other affected 11 facilities. And C, requires communication of key 12 lessons learned to management and hourly 13 employees as a result as well as to industry. 14 This recommendation is also 15 tangentially related to the next recommendation 16 that was issued to BP, R13, this was R12 by the 17 way. That it also required BP to ensure and 18 monitor through its senior executives, both 19 leading and lagging process safety indicators 20 indicating measures to strengthen safety 21 performance at its refineries. 22 CSB had numerous communications with

(202) 234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. 39 1 the BP organization from 2007 with regarding to 2 how these recommendations were being implemented. 3 In September of 2012, BP finally provided us 4 sufficient information for both B12 and B13 for 5 the Board, for the recommendations partner to 6 evaluate to them to determine if their standards 7 changed, or those recommendations that we could 8 submit to the Board. 9 At that time, there was an evaluation 10 of the responses by the staff and the Office of 11 Recommendations and at that time, they were 12 recommended to be both closed as acceptable 13 action. The rationale for this particular 14 recommendation that prompted that recommendation 15 by the CSB staff was that in regard to Bullet A 16 of the recommendation, that BP had developed a 17 revised code of conduct in June of 2005 which 18 required prompt incident reporting by all of 19 their employees of any particular incident that 20 occurred in BP operations which was widely 21 communicated throughout its organization when it 22 was launched.

(202) 234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. 40 1 And that there is an annual 2 certification by BP team leader that is followed 3 to ensure that this new standard of conduct is 4 being met in the organization. This annual 5 certification is passed on up through the BP line 6 of command to the Chief Executive Officer to 7 assure that this particular provision is being 8 followed throughout the BP organization. 9 BP also developed a BP open talk, 24/7 10 multilingual help line where people could call 11 anonymously and voice concerns about incidents 12 within the BP organization. Those incidents, the 13 hotline is actually monitored by an outside 14 party. 15 And then that information is taken and 16 then referred again, back into the internal part 17 of the BP organization in an area where that 18 particular area of the plant that's being, the 19 incident was alleged, somebody can investigate 20 who is not part of that line organization. To 21 assess whether or not that particular incident 22 has been looked at or not and how BP is examining

(202) 234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. 41 1 that particular incident that was being alleged 2 at the hotline. 3 In addition, BP had modified its group 4 practices in the refining sector to require 5 incident investigations for both documented 6 incidents and near misses which include 7 developing of investigation teams, conducting 8 investigations using root cause analysis 9 techniques, determining causes, establishing 10 remedial actions, and then reporting the finding 11 of those investigations. 12 Once those investigations findings 13 were developed, they were placed into an internal 14 system at BP called their Traction system which 15 is designed to follow up all those 16 recommendations until they get successful 17 closure. 18 Those items in the BP tracking system 19 are also incorporated into the company's leading 20 and lagging indicators and are monitored on a 21 quarterly basis to ensure that traction items are 22 being dealt with. Particularly with regard to

(202) 234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. 42 1 incident investigations that aren't being closed 2 out on a prompt basis. 3 Finally, regarding dissemination of 4 lessons learned, BP has developed various 5 mechanisms both within and outside of its 6 organization to post information about these 7 incidents which include posting intranet results 8 of these investigations internally for the 9 benefit of their employees. 10 They also have email blasts available 11 when investigations get completed where people 12 can be informed of the results of investigations. 13 They produce quarterly bulletins that highlight 14 incident investigations that have occurred in the 15 organization. 16 And that BP, with regard to outside 17 participation, participates amongst various 18 industrial associations like the American 19 Petroleum Institute and also makes presentations 20 at other health safety and environmental related 21 national conferences and international 22 conferences that are convened throughout the

(202) 234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. 43 1 year. 2 With these many examples that were 3 provided with the BP documentation, all of that 4 could be verified. The only thing that the staff 5 could not verify at the time of this 6 recommendation was being prompted for closure, 7 was actually how the BP employees felt about the 8 implementation of these efforts. 9 Our organization is a very small 10 department, we only have three people in our 11 department to be able to follow up on over 170 12 recommendations. It is impossible for us to 13 survey the BP community to find out. We did 14 extend our outreach at the time to the recognized 15 bargaining units at the facilities. 16 And we basically got informal 17 information back that some things were working 18 and some things weren't working. But no 19 formalized information at the time. So that led 20 the staff to conclude this should be proposed to 21 the Board for an open, acceptable action. 22 As such, it was prepared for notation

(202) 234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. 44 1 Board vote and went before the Board, both R12 2 and R13 at the same time. R13, which involved 3 leading and lagging indicators at the BP 4 refineries was closed as acceptable by the Board. 5 However, R12 was calendared by Board Member 6 Griffon on April 19th of 2003 so that this issue 7 could be discussed in a public meeting and that 8 all affected parties would have an opportunity to 9 provide input to the Board. 10 MEMBER ENGLER: Point of information, 11 excuse me. 2013? 12 MR. KASZNIAK: Yes, 2013. And it has 13 been calendared up until then, until the recent 14 new Board provisions require it to be discussed 15 at an open public meeting which is being held 16 today. 17 So the public discussion on this issue 18 has long been overdue. However, now that several 19 years have passed since BP has revised its 20 incident reporting system, we at the CSB are 21 looking forward to hearing both from the public 22 and in particular from the company and the

(202) 234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. 45 1 workers about how it's performing. And whether 2 or not it is effective to this day. 3 MEMBER ENGLER: Thank you. With that, 4 I think I'd like to open the floor for any 5 comments from the public through the Board on the 6 report that Mr. Kaszniak just presented 7 concerning the issue. 8 We have none by the way, no one signed 9 up on the sign up sheet that was in the hall but 10 perhaps some folks missed it. Or if there's 11 anyone on the telephone that would like to 12 comment. 13 OPERATOR: We will now begin the first 14 public comment session. If you have a comment, 15 please press star then 1 from your touchtone 16 phone. If you wish to be removed from the queue, 17 please press the pound sign or the hash key. If 18 you are using a speaker phone, you may need to 19 pick up the handset first before pressing the 20 numbers. 21 Once again, if you have a comment, 22 please press star then 1 from your touchtone

(202) 234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. 46 1 phone. It looks like we have a comment from 2 Ashlee Dunham from Barton Law Firm. Your line is 3 open, please go ahead. Ashlee, if you're on 4 mute, please unmute yourself. And at this time 5 Ashlee, I have no audio, I'll be releasing you 6 back in the call. At this time we have no 7 further comments. 8 MEMBER ENGLER: We have received a 9 written submission from the United Steelworkers 10 Health Safety and Environment Department. We're 11 looking forward to reaching out to BP. Again, 12 it's our understanding that if BP is represented 13 in the room that they have chosen not to make 14 comments at this time. 15 We will make additional efforts to 16 reach out both to the United Steelworkers which 17 represents workers at BP facilities as well as BP 18 Board of Directors to see if there's any comment 19 that they would like to make before reconsidering 20 this. 21 Again, this is an example, by the way, 22 even though there's no comment, it's an example

(202) 234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. 47 1 of something, as Mr. Kaszniak pointed out, that 2 we actually have to do. The way our procedures 3 have worked, calendaring, my understanding was 4 originally intended so that issues would come to 5 public meetings and they wouldn't disappear. So 6 that's why this is on the public agenda for 7 today. 8 But given that there's no comments and 9 yet we seek further input, I'd like to make a 10 motion to table this item to the next, to a 11 subsequent CSB public business meeting. Do I 12 have a second? 13 MEMBER EHRLICH: I'll second the 14 motion. 15 MS. MCCORMICK: Okay I'll call the 16 roll. So on the motion to table this item for 17 discussion, Mr. Ehrlich? 18 MEMBER EHRLICH: Aye. 19 MS. MCCORMICK: Mr. Engler? 20 MEMBER ENGLER: Aye. 21 MS. MCCORMICK: Motion passes. 22 MEMBER ENGLER: Thank you. At this

(202) 234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. 48 1 point, because we're actually running a bit ahead 2 of schedule I think we will not have a long 3 break. Amy, do you know if Dan is ready to -- 4 MS. MCCORMICK: I'll go get him. He's 5 upstairs with the families. 6 MEMBER ENGLER: Oh they are here, 7 okay. So why don't we just take a very short 8 break until Dan Tillema, our investigator who 9 will be presenting the next update on the DuPont 10 La Porte, Texas investigation is able to come 11 down. 12 I think, according to Amy McCormick, 13 he'll be accompanied by some family members of 14 the victims in that tragedy. So we'll just take 15 a couple minutes so if people need to take a very 16 quick break, please do so but we'll be 17 reconvening very shortly. 18 (Whereupon, the above-entitled matter 19 briefly went off the record.) 20 MEMBER ENGLER: Okay thank you all. 21 A number of folks have joined us since this brief 22 break. Could I request that those who have just

(202) 234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. 49 1 joined us in the room stand and just introduce 2 themselves, who you are, where you're from? 3 CLAY DUGAS: I'm Clay Dugas from 4 Beaumont, Texas. 5 JANE LEGER: I'm Jane Leger, I'm from 6 Beaumont, Texas as well. 7 MR. DELAUNE: I'm Justin DeLaune from 8 Baton Rouge, Louisiana. 9 LYNETTE SOTO: Lynette Soto from 10 Pasadena, Texas. 11 MICHELLE TISNADO: Michelle Tisnado 12 from La Porte, Texas. 13 GILBERT TISNADO: Gilbert Tisnado, 14 from Pasadena, Texas. 15 MR. TILEMMA: Dan Tillema from the 16 Western Regional Office. 17 MEMBER ENGLER: Thank you all for 18 joining us. Just briefly to introduce this part 19 of the agenda, some remarks. On November 14, 20 2015 after a release of methyl mercaptan at the 21 DuPont facility in La Porte, Texas, four 22 employees died in what clearly appeared to be a

(202) 234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. 50 1 preventable incident. 2 They were Crystal Wise, age 53, Robert 3 Tisnado, age 39, Gilbert Tisnado, age 48, and 4 Wade Baker, age 60. Before we hear a report from 5 CSB's Dan Tillema on the status of this 6 investigation, I would like to recognize the 7 family members who have joined us today. They 8 are, they just introduced themselves, Gilbert 9 Tisnado, Robert and Gilbert's father. Michelle 10 Tisnado, Gilbert Tisnado's spouse. Lynette Soto, 11 Robert and Gilbert's sister. 12 On behalf of the Board, we offer our 13 condolences on your terrible losses. We pledge 14 to make every effort to help prevent such tragic 15 chemical incidents from happening in the future. 16 To recognize the seriousness of this incident, I 17 would ask that we all stand for a moment of 18 silence in recognition and memory. 19 (Moment of silence.) 20 MEMBER ENGLER: Thank you. So Mr. 21 Tilemma could you proceed with your report? 22 MR. TILLEMA: Yes, thank you. I'm Dan

(202) 234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. 51 1 Tillema. I'm the Lead Investigator for the CSB's 2 investigation on the DuPont La Porte incident. 3 My presentation today will cover the CSB's 4 history with the clients and some of the factors 5 that the Board weighed in making a deployment 6 decision to the La Porte incident, the basic 7 incident and investigation facts, and conclude 8 with a discussion of some serious hazards at 9 DuPont and our draft proposed recommendations for 10 the Board's consideration. 11 I should probably clarify one item 12 before we go further. It's an item that's caused 13 confusion with many people that we've talked to 14 throughout the investigation. Our investigation 15 and the findings that we are discussing today are 16 only focused on the crop protection unit where 17 the insecticide manufacturing is done at La 18 Porte. The herbicides unit and the hydrochloric 19 acid unit are not presently part of the focus of 20 our investigation. 21 In 2010, the CSB investigated three 22 serious incidents over a two day period at the

(202) 234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. 52 1 DuPont Belle facility. One of these incidents 2 resulted in a fatality. Then later in 2010, the 3 CSB investigated another fatality incident at the 4 DuPont Yerkes facility. And finally, just over 5 eight months ago, the CSB began its investigation 6 of the DuPont La Porte accident that tragically 7 claimed the lives of four workers. 8 Listed on this slide is our 9 recollection of important factors that weighed in 10 the Board's decision to deploy to those four 11 incidents. Factoring heavily was the seriousness 12 of this incident along with the fact that this is 13 the third fatality incident at three different La 14 Porte facilities. We believe this is a first in 15 CSB history. 16 The CSB was also concerned about 17 DuPont's process safety performance. And while 18 DuPont's personal safety performance has been 19 good, these incidents reflect poor process safety 20 performance. It's important to know and 21 understand that the CSB has been advocating for 22 companies to have a separate focus on process

(202) 234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. 53 1 safety since the 2005 BP Texas City incident. 2 This slide just lists some of the key 3 facts about the investigation. As we stated 4 already, it was November 15, 2014 the four 5 employees were killed. There was 24,000 pounds 6 of highly toxic methyl mercaptan released on and 7 off site. The releasing occurred inside an 8 enclosed building which is an important factor. 9 All four employees were inside the building. Two 10 of the four fatalities occurred during rescue. 11 To give people an idea of the size of 12 the La Porte facility, we listed that there's 300 13 personnel at this site at the time the incident 14 occurred, employed at the site at the time the 15 incident occurred. 16 Then just some brief comments on the 17 investigation progress. Our initial deployment 18 started on November 16th and concluded on June 19 12th. We are not finished with the 20 investigation. We concluded our initial 21 deployment in order to develop and promote 22 proposed recommendations that we're discussing

(202) 234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. 54 1 today. 2 During the investigation, we 3 identified serious process safety concerns. We 4 routinely communicated these to DuPont. Our 5 concerns were not kept a secret, they were well 6 known. However, on June 11th, DuPont management 7 communicated their dismissal of some key actions 8 we believe are needed in order to prevent future 9 similar major accidents. These serious hazards 10 are the focus of the proposed recommendations. 11 Next I'll cover subjects that are 12 relevant to the proposed recommendations and 13 we're going to cover these at a fairly high 14 level. The proposed recommendation document 15 provides much more specific detail on each of 16 these topics. 17 First, I'll discuss inherently safer 18 design. Following the Bhopal tragedy in 1984, 19 DuPont modified its methyl isocyanate process 20 using inherently safer design. DuPont's new 21 design included the use of an open building 22 structure and installing equipment directly to an

(202) 234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. 55 1 incinerator for destruction of highly toxic 2 chemicals. 3 The snippet at the bottom of this 4 slide is an important excerpt from DuPont's 5 actual design document clearly showing the 6 inherently safer design principles they applied. 7 However, DuPont did not effectively apply similar 8 inherently safer design to other highly toxic 9 chemicals at La Porte such as methyl mercaptan 10 and chlorine. 11 Since the November 2014 incident took 12 place inside the enclosed and unventilated 13 building, not effectively applying inherently 14 safer design more broadly following Bhopal played 15 a significant role. 16 The next topic is enclosed building 17 hazards. The area of the process where the 18 incident took place is inside an enclosed 19 building. At this point, we know of no 20 documented reason or design purpose that requires 21 this equipment to be located inside a building. 22 However, locating this equipment

(202) 234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. 56 1 inside the enclosed building introduced 2 significant hazards to workers that DuPont has 3 not effectively identified or controlled. The 4 building itself is not what companies would 5 consider a containment building. Companies in 6 the industry have made choices at times to 7 enclose highly toxic chemical manufacturing 8 equipment inside containment buildings. 9 The general idea with the containment 10 building is that if a significant leak were to 11 occur, the leak would be contained in the 12 building and then the vapors would be routed to a 13 destruction device such as an incinerator or a 14 scrubber system. Industry has recognized that 15 when containment buildings are used, there is a 16 benefit to the community because it is less 17 likely that the release will travel offsite to 18 impact the community. 19 However, industry has also recognized 20 that enclosing a leak within the building creates 21 a increased work risk to workers. The building 22 at La Porte is not considered a containment

(202) 234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. 57 1 building. Doors are routinely kept open, piping 2 penetrations are not sealed leaving large air 3 drafts in the building. And the ventilation fan 4 is discharged directly to the atmosphere rather 5 than an incinerator or a scrubber system. 6 So because of the building's design, 7 the building at DuPont has all the negative 8 increased risk to workers without any of the 9 benefits of decreased risks to the community. 10 Next topic I'll address is building 11 ventilation hazards. First, the ventilation fans 12 were classified as PSM critical equipment by 13 DuPont and yet neither fan was in operation at 14 the time of the incident. However, even if both 15 fans had been operating, the rate of the methyl 16 mercaptan release was just too large and the fans 17 would have not been able to prevent a lethal 18 atmosphere inside the building. 19 The ventilation fan for the area of 20 the unit where the methyl mercaptan release 21 occurred had not been operating since October 22 20th despite an urgent work order being written

(202) 234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. 58 1 to repair it. Also, DuPont did not add any 2 additional safety precautions such as worker 3 access restrictions, or require workers to have 4 any additional personal protective equipment to 5 access the building when the ventilation fans 6 were not operating. 7 The stairs located inside the building 8 are the primary means to access the various 9 levels and equipment inside the building. These 10 stairs are designed for fire escape and DuPont 11 has not effectively evaluated entry or escape 12 hazards for toxic or inert gas atmospheres. 13 The building stairways are designed to 14 be totally enclosed and they are not ventilated. 15 However, the internal doors between the stairway 16 and the inner portion of the building where the 17 manufacturing equipment containing hazardous 18 chemicals is located, do not provide an effective 19 barrier to keep hazardous gases from entering 20 into the stairway. 21 Our next topic is that DuPont's gas 22 detectors, and their response to these gas

(202) 234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. 59 1 detectors, is not effective. Overall, the design 2 of the detectors for methyl mercaptan do not 3 effectively warn workers or protect the public. 4 The detector alarm point is 25 parts 5 per million for methyl mercaptan. This is well 6 above the OSHA 0.5 part per million recommended 7 limit. In addition, the response to detector 8 alarms is not sufficient to protect the public 9 and I'll get this more on the next slide. 10 In the hours prior to the incident, 11 multiple highly toxic methyl mercaptan detectors 12 sounded but DuPont's emergency response team was 13 not notified and the area was not cleared of 14 personnel. In addition, our investigation 15 identified methyl mercaptan releases on November 16 13th and November 14th, so the day and two days 17 before this incident. 18 These highly toxic chemical releases 19 resulted in detector alarms but were never 20 reported as releases nor investigated as serious 21 process safety incidents. 22 Our next topic is DuPont's process

(202) 234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. 60 1 hazard analysis. We found that process hazard 2 analyses did not consider key events that took 3 place during this incident. Valves connecting 4 the liquid methyl mercaptan feed line to the 5 vapor waste gas vent header were open at the time 6 of the incident. 7 However, the process hazard analysis 8 never considered the hazard that the line could 9 create. PHAs, which is the acronym for process 10 hazard analysis, at DuPont are broken into 11 sections. Most companies do something very 12 similar. OSHA and EPA require these PHAs to be 13 re-validated every five years. 14 To spread the work load out over the 15 five year period, companies do a portion of these 16 PHAs each year so that at the end of the five 17 year period, each PHA has been reviewed. DuPont 18 has broken its PHAs into 15 sections. So 19 essentially there are 15 different PHAs done over 20 that five year period. 21 Following the incident, DuPont 22 conducted a new process hazard analysis on two of

(202) 234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. 61 1 these 15 sections. To their credit, DuPont 2 applied a much more robust technique to these two 3 PHAs that requires far more time and considers 4 more potential scenarios than their previous PHAs 5 had done. 6 This effort resulted in their PHA 7 teams identifying hundreds of new action items. 8 However, DuPont management stated to us back in 9 June that they were not going to apply this 10 approach to the other 13 PHAs prior to their plan 11 start up in August. 12 Our next topic is ventilation 13 evaluation. In short, the building air dilution 14 ventilation system has never been evaluated by a 15 PHA or engineering study. Even before this 16 incident, DuPont had scheduled such a review for 17 2017. 18 No evaluation of the ventilation flow 19 rate or effective distribution of ventilation air 20 had ever been conducted on the area of the 21 building where the release took place. Even with 22 the relevance of the suspicion of ventilation air

(202) 234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. 62 1 to the November incident, DuPont did not intend 2 to conduct this review prior to the August 2015 3 start up. 4 Our next topic is building safeguards. 5 I've been told by at least one person that this 6 slide is confusing. I think the supporting 7 information, the full 42 page proposed 8 recommendation document does a much better job of 9 what we are trying to say here. 10 But the message we want to convey is 11 that DuPont's very small process analyzer 12 buildings are equipped with sensors to verify 13 there is adequate oxygen concentration. These 14 sensors alarm and a green light at the door to 15 the building turns off to warn workers of 16 potential hazardous conditions so they don't 17 enter the building. 18 We think this is good and we are 19 pointing out that the workers who approached the 20 door to the much larger manufacturing building 21 where the incident took place have no similar 22 protections. There are no detectors inside those

(202) 234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. 63 1 doorways to monitor the atmosphere and warn 2 workers if it is not safe to enter. 3 The last topic I'm going to cover is 4 pressure release systems. We found pressure 5 release systems at DuPont that are improperly 6 designed and have not been evaluated to ensure 7 they relieve to a safe location as required by 8 industry codes and standards. We provided some 9 very specific details in the 42 page proposed 10 recommendation document. 11 So the proposed draft recommendations 12 for the DuPont crop protection unit are as 13 follows. These are just a high level summary of 14 the recommendations. The full text of each 15 recommendation is much more detailed, typically 16 100 words per recommendation. 17 So recommendation one, conduct and 18 implement a comprehensive inherently safer design 19 review. Recommendation two is to conduct a PHA 20 and engineering evaluation of the building's 21 design and its ventilation system. 22 Recommendation three is to perform a site wide

(202) 234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. 64 1 pressure release study to ensure compliance with 2 codes and standards. And recommendation four is 3 to develop an expedited schedule for robust, more 4 detailed PHAs like DuPont completed after the 5 incident for those two sections. 6 The last two slides reflect our 7 current status. We communicated to DuPont on 8 June 11th that we were going to pursue these 9 recommendations. After DuPont was provided with 10 a draft of these recommendations, they told us 11 that they would suspend the August start up to 12 address our concerns. 13 We also expect to receive some type of 14 written plan to address these proposed 15 recommendations by the end of this month. 16 Although DuPont has stated a willingness to 17 address these items, the investigation team is 18 still recommending that the Board formally adopt 19 and approve the issuance of these proposed 20 recommendations. 21 This is the CSB's formal program to 22 allow the Board to effectively track and evaluate

(202) 234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. 65 1 DuPont's mitigation of these serious hazards. 2 And it provides an opportunity for the public to 3 be informed of the implementation status. 4 MEMBER ENGLER: Thank you Mr. Tillema. 5 We very much appreciate the time and effort that 6 you have spent in Texas, far away from Denver, 7 for a long time working to discover the 8 underlying causes of this incident. Member 9 Ehrlich, do you have any questions? 10 MEMBER EHRLICH: Yes, I do. First of 11 all Dan, outstanding job. Read all the documents 12 you've written and Don, my same opinion goes to 13 you. You referenced the 42 page document. Is 14 that material the same as the 40 page document 15 that was issued on July the 13th? 16 MR. TILLEMA: It is. There's been a 17 couple of updates to it which extended the 18 length. But it is essentially the same document 19 that you saw. 20 MEMBER EHRLICH: Okay. And these have 21 been reviewed by DuPont to determine that there's 22 no confidential business information contained

(202) 234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. 66 1 within it? 2 MR. TILLEMA: It went through both 3 confidential business information review at 4 DuPont as well as factual review and we've 5 implemented their comments. 6 MEMBER EHRLICH: Okay so did they find 7 anything factually incomplete or incorrect? Or 8 has that been changed? 9 MR. TILLEMA: In general, we have a 10 very good working relationship with DuPont on 11 these type of activities. You know, there's 12 areas where I as an engineer choose a word that I 13 think means something and they suggest that it 14 might mean something else. And so we make those 15 kind of modifications. But there were no 16 material objections to the findings itself. 17 MEMBER EHRLICH: Okay, great. And the 18 reason you call them urgent recommendations, is 19 that because of an imminent hazard of danger? 20 MR. TILLEMA: Good question. From the 21 investigation team's perspective when we paused 22 on June 11th, they were imminent hazards. And

(202) 234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. 67 1 our process for addressing imminent hazards per 2 Board Order 22 which is publicly available on the 3 website. If you Google search CSB Board Order 4 22, you'll see our process for recommendations. 5 For imminent hazards, the only appropriate 6 recommendation is an urgent recommendation. 7 MEMBER EHRLICH: So at this point, 8 what stands between getting these recommendations 9 to the Board for final approval? Are they not 10 ready? 11 MR. TILLEMA: That might be a great 12 question for Don Holmstrom. 13 MR. HOLMSTROM: Currently given the 14 fact that we have met with DuPont and received 15 some information about the fact that there's now 16 an indefinite delay in starting up the building, 17 we are reviewing the document internally through 18 a staff review process and anticipate within, I 19 think, a relatively short period of time. 20 As Dan indicated, the document is 21 fairly mature, to be able to, once the document 22 has gone through that staff review for it go to

(202) 234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. 68 1 the Board for comment which ultimately, you at 2 the Board as the deciders of the recommendation. 3 MEMBER ENGLER: When do you think that 4 will happen? 5 MR. HOLMSTROM: Well we hope to have 6 it happen relatively soon. And I think that, you 7 know, we're setting up meetings, you know, 8 attempting to set up meetings even this week to 9 try to further the discussion. So I believe 10 relatively soon. 11 MR. TILLEMA: I would add that the 12 investigation team has been working with the 13 folks who make our video animation essentially 14 since the investigation started. The complexity 15 of the incident at DuPont really lends itself 16 well to an animation. 17 It's very difficult to just stand up 18 here and describe all the nuances of how the 19 piping is interconnected and people come away 20 with a good understanding of how that happened. 21 That animation is nearly complete. Our view was 22 to release them at the same time.

(202) 234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. 69 1 MEMBER EHRLICH: Okay. I'm, again, 2 you guys have done an outstanding job. I visited 3 the site as well, you know. And I spent 50 years 4 in the chemical industry even though I'm only 35- 5 years-old. I have to say these guys have done a 6 tremendous job in terms of finding out what 7 happened and made recommendations to see to it 8 that it doesn't happen again. Thank you both. 9 MEMBER ENGLER: Thank you Member 10 Ehrlich. Dan, what would you say the next steps, 11 if you want to comment as well Don, what are the 12 next steps moving forward in the investigation? 13 These are essentially interim recommendations, 14 preliminary to the development of a broader final 15 report. Where do you see going after this stage? 16 MR. TILLEMA: As I mentioned, we 17 paused the investigation at this point in order 18 to develop this document and issue these 19 recommendations. So we are still far from being 20 complete at La Porte. 21 So we need to finish our full causal 22 analysis and get a complete understanding of the

(202) 234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. 70 1 causes, to the best of our ability, at La Porte. 2 And then I think we need to start looking at what 3 the corporate oversight role was that allowed 4 these problems to exist for so long. 5 That would be our next focus, trying 6 to understand at a corporate level the various 7 things that are supposed to prevent these types 8 of accidents from happening and have significant 9 process safety management gaps at a site such as 10 corporate audit. 11 MR. HOLMSTROM: Board Member Engler, 12 I mentioned that for the ExxonMobil investigation 13 we have a Board order on scoping. And so we are 14 implementing a scoping process for the DuPont 15 investigation which is, we think a key way to 16 have the Board's input into what kind of product 17 we're going to produce, full investigation 18 report, what sort of issues we're going to 19 examine and have full input to that. 20 We currently have a draft that, again, 21 is both ExxonMobil and DuPont are recent 22 investigations. So at this point, the work plan

(202) 234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. 71 1 and everything else is dependent upon, is it a 2 narrow scope? Is it a broad scope? Currently 3 we're engaging in the scoping process. 4 But as Dan indicated, given the fact 5 that we've had three, actually four previous 6 incidents at two separate facilities and two 7 reports from the CSB in addition to this 8 incident, that we're going to be potentially 9 looking for linkages and issues related to those 10 investigations and potentially other issues. And 11 how that impacts, looking more broadly than at 12 just La Porte, Texas. 13 MEMBER ENGLER: Thank you. At this 14 point, I would like to open the floor for public 15 comment. On the public comment sheet, we have 16 three people who have signed up so far. First 17 I'd like to recognize Lynette Soto. 18 MR. TILLEMA: They weren't here 19 earlier. Are you having them come up here for 20 the comments or just staying where they're at? 21 MEMBER ENGLER: I think it would be 22 great if people came up to the podium, if people

(202) 234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. 72 1 are comfortable doing that. Thank you. 2 LYNETTE SOTO: Good morning. I 3 apologize in advance, I am very emotional. I 4 want to speak from my heart and tell you how I 5 feel. I'm here for two main reasons, the main 6 reason is to give voice to my brothers. I'm the 7 sister of Robert and Gilbert Tisnado. 8 They are just not a casualty or a 9 statistic of DuPont, they were my brothers. My 10 family is devastated, heartbroken. There is no 11 measuring the amount of pain and suffering we are 12 going through by losing these two people. 13 My brothers loved their job, loved 14 their job. A month prior to the incident, I 15 applied for a job at Valero where my oldest 16 brother Gibby's two boys work. I wasn't sure 17 about working there so when Gibby brought me over 18 these tests, I said, I don't know Gib, I'm kind 19 of worried about it. 20 He said Nette, there's a lot of 21 dangerous chemicals. He's like, but there's so 22 many safety precautions that you don't have to

(202) 234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. 73 1 worry about it. And my brother truly believed 2 that his environment that he worked in was safe. 3 And he was wrong. I mean he was wrong - this 4 was not an accident. 5 I live in this area. La Porte, 6 Pasadena, Deer Park, 90 percent of the people 7 that live there are related to or know somebody 8 personally who lives in those plants. There are 9 all those people are know well aware of the 10 safety hazards. The majority of my friend's 11 husbands do not come up or comment or say 12 anything because financially, they are paid well. 13 Just because you're paid well doesn't 14 mean you should have your life in jeopardy. 15 You're playing Russian Roulette with their lives. 16 This wasn't an accident, this was gross 17 negligence. 18 These issues at this plant had been 19 there for years. If it was an accident, we would 20 not be here talking to you right now because of 21 course, living in that environment, there are 22 accidents. This wasn't an accident, this was

(202) 234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. 74 1 deliberate neglect, letting it go for so many 2 years. And unfortunately, my brothers were two 3 of those casualties. 4 But I won't let them go without being 5 heard their voices. They should have never died. 6 My brothers were such wonderful people. I'm not 7 saying that because I'm related to them. I'm 8 saying it because it's genuine and it's true. 9 They were hard working men. My 10 youngest brother had a one-year-old, a three- 11 year-old who will never know what a bright piece 12 of sunshine that little boy was. He was the baby 13 of the family, let me tell you. He lived that to 14 the T. He was a pain, I understand that. But he 15 was a breath of fresh air. 16 And my oldest brother, he was my go-to 17 guy. For anything, going through a divorce, 18 personal, whatever it may be, Gibby had my back. 19 They worked both nights and so when he was over 20 there doing the panels, I would speak to him 21 about it. 22 I'm here to beg and plead for these

(202) 234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. 75 1 recommendations and this report to go through. 2 Nobody should have to go through this anymore. I 3 Googled the heck out of DuPont and their safety 4 records and I read that between 2007 and now, 5 there's been over 34 different leaks. There's 6 been 12 people, 12 deaths. I don't understand 7 what we're doing here. They need to fix it. 8 I know that the unit that my brother's 9 in is the money maker. It made over $1 million a 10 year. And you know what, the money that they 11 make, it goes through our community. And we have 12 better schools and stuff because, yes, all these 13 chemical plants are near us. And I know this. 14 My daughter's a teacher at Deer Park. 15 I have grandchildren who live near there. But it 16 needs to be safe. Make your money. Maybe I 17 Google too much, I know that CEO, the Forbes, the 18 CEO of DuPont is Number 26. So that means she is 19 way up there and they can do what they want. 20 How many times do people have to lie 21 and cut corners and stuff so financially it's 22 better for them? If you have this facility and

(202) 234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. 76 1 it's making you all this kind of money, then 2 wouldn't it be smart to invest in it and make 3 sure it's safe? So you can make all the money 4 you want. But I'll be danged if you should be 5 able to kill people and use them as a casualty or 6 just, oh well we lost two today, no big deal. 7 But to the family, it was a big deal. 8 They are vital people that worked from the heart, 9 they loved their job, they loved the people 10 there. They didn't deserve to die for a profit 11 and that's what it is. I mean DuPont's got more 12 money than you can shake a stick at, I'll be the 13 one to tell you. And that's fine and dandy. I'm 14 not envy of that. 15 What I'm mad about is you have no 16 right to take my brothers. They were my life. I 17 can't describe to you the heartache, I can't put 18 into words but it's wrong. They need to fix it. 19 It's been a problem apparently, that building has 20 been here since World War Two. It never should 21 have been there. 22 I read his report. I've heard Dan and

(202) 234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. 77 1 I appreciate you coming to my house and 2 explaining it to my family. And not only that, 3 explain it to me like I was a five-year-old 4 because I don't get all that. I'm not into all 5 this stuff. 6 But I know that my brothers died in 7 vain and they shouldn't. DuPont has gotten away 8 with a lot of stuff and they cut these corners. 9 But when is enough? When are you going to say, 10 hey we do these recommendations and people keep 11 dying? When is there point where you say, hey 12 maybe they have a problem, maybe we should make 13 them be accountable and fix it? 14 Somebody, somewhere, I'm begging you. 15 Somebody's got to be accountable. I mean they've 16 gotten away with it for so long. Not with my 17 brothers, I mean, there's nothing we can do about 18 my brothers. No matter what I pray and I beg, my 19 brothers won't come back. 20 But nobody else should have to lose 21 their brothers, their sons, their spouses, nobody 22 for something like that. You work hard and these

(202) 234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. 78 1 people give their life for DuPont. And for what? 2 For you to think they're just disposable. We're 3 not disposable. 4 The people that work there, that have 5 been there 23 years, give their whole life. Mr. 6 Baker had been there 40 years. He deserved 7 better than that. He should have been able to 8 retire. He couldn't. That unit was horrible. 9 They knew I'm sure, Gibby told me that the 10 ventilation system had been broke. You see the 11 work orders. 12 I'm sure there's probably more that 13 disappeared somehow, magically disappeared. That 14 place is horrible. The ventilation system, the 15 pipes, I don't even know how to, whatever you 16 want to call it, that little thing who rigged 17 that little pipe in there, should have never done 18 that. And they should have never been able to do 19 that but they did. 20 Not just in La Porte and DuPont and 21 yet, that's my main objective because I live 22 there. But what about those plants in all those

(202) 234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. 79 1 places? I heard all kinds of stuff, I read so 2 much stuff. I mean when is there a stopping 3 point when we say that they need to be held 4 accountable? 5 They have the money. You make all the 6 money you want but make sure you're doing it 7 safely and not jeopardizing people that I love 8 and the community that I love. So that's all I 9 have to say, thank you. 10 MEMBER ENGLER: Thank you very much. 11 Next will be Walter Prillaman from the 12 International Chemical Workers Union. 13 MR. PRILLAMAN: Good morning. I'm 14 Walter Prillaman Jr. I'm a second generation 15 DuPonter with 36 plus years service. Sorry that 16 touched me. I know those boys, they're good 17 boys. I guess you could say that I'm just 18 (inaudible). 19 I'd like to thank the Chemical Safety 20 Board for the opportunity to be here. I'd also 21 like to thank OSHA, DuPont, International 22 Chemical Workers Local 900C which I'm the Safety

(202) 234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. 80 1 Officer. Thank you to the investigation team for 2 the hard work that ya'll have done. It was 3 definitely evident in the interim report and how 4 deep that you dug through this incident. 5 Their report along with OSHA's NEP 6 report has already started to have impact on 7 safety. With four new safety items started just 8 this week so thank you for that. In my opinion, 9 these recommendations, without these 10 recommendations, these changes would not have 11 started to happen. 12 We need to be held accountable. It is 13 important that this report be made public. This 14 information will identify and help make 15 corrections. The community that surrounds our 16 plant and the lives of the workers are too 17 important. Thank you. 18 MEMBER ENGLER: Thank you Mr. 19 Prillaman. Next will be Justin DeLaune, do I 20 have the pronunciation correct? 21 MR. DELAUNE: Yes sir. 22 MEMBER ENGLER: From the Smith Law

(202) 234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. 81 1 Firm. 2 MR. DELAUNE: Good morning ladies and 3 gentleman. My name is Justin DeLaune and I'm an 4 attorney from Baton Rouge, Louisiana with the 5 Smith Law Firm. I represent a whistleblower 6 federal False Claims Act against DuPont arising 7 out of toxic gas leaks at DuPont's Darrow, 8 Louisiana facility, also known as the Burnside 9 site. 10 The suit alleges that DuPont withheld 11 leak information from the EPA to avoid paying 12 fines. A two week trial jury commenced and 13 DuPont prevailed following an eight hour jury 14 deliberation. However, following this verdict, 15 it was discovered that DuPont withheld material 16 information from this trial. 17 On June 25, 2015 a federal judge set 18 aside the jury verdict that was in favor of 19 DuPont. The court found that DuPont had engaged 20 in misconduct that impacted the integrity of the 21 trial process by withholding information 22 regarding gas leak calculations and withholding

(202) 234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. 82 1 information regarding OSHA violations similar to 2 those in La Porte, Texas. I have a copy of this 3 ruling available for the Board along with several 4 other things. 5 The evidence in our case includes an 6 audio recording of a meeting led by Tom Miller, 7 the plant manager at the Darrow Burnside facility 8 since February of 2011. This meeting was 9 regarding anonymous leak reports by employees to 10 outside agencies. 11 This audio recording was accepted into 12 evidence in our case. I have a copy of the 13 recording available for the Board and also have a 14 transcript of the recording prepared by a 15 certified court reporter so that the Board may 16 follow along in the recording at a later time. I 17 will now read an excerpt for you beginning at 18 Page 7 of the transcript and continuing to Page 19 9. 20 Tom Miller, the plant manager is the 21 main speaker in this excerpt. I want to have a 22 quick inaudible -- it's a meeting, but I got

(202) 234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. 83 1 here, the points that was written Friday I guess. 2 About 3:00 the fire department came to the plant, 3 Alan (phonetic) was working. He called me, they 4 were responding to a gas cloud above the Burnside 5 plant. 6 I guess that's what the complaint was. 7 I can call the fire department and find out what 8 exactly happened but I don't know if you guys 9 know that this is the third complaint that we've 10 gotten from an outside entity. One from, it says 11 MBQ but it should be DEQ, one from OSHA, and 12 there's one here like in the last month. 13 And you know, I know there are folks 14 who are unhappy with the gas leak. I am too. I 15 guess that's what's prompting all of this but, 16 you know, of course these all have been 17 complaints. I don't know who is calling them in 18 but if this is coming from inside the plant, I'm 19 very disappointed. 20 You know, we've got to be in the 21 position where these things are talked about and 22 discussed. There have been a lot of people

(202) 234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. 84 1 working on these things, we've had two shutdowns, 2 and we've had a bunch of people up here doing all 3 these things to try to contain this thing and 4 nobody believes that. 5 Then go ask the folks that have been 6 doing it. But, you know, there was an 7 unidentified speaker, why would somebody in the 8 plant call? Tom Miller responds, I don't know 9 but I don't know why somebody would call OSHA 10 from outside the plant but who knows. 11 But the point is that whenever a third 12 party gets called, it never works out for the two 13 parties that are involved on the receiving end of 14 that. It never does. And whoever thinks it does 15 is nuts. And we've seen it time and time again, 16 both within the company and outside. 17 So you know my request is that if you 18 guys know of anybody doing this or if you're 19 doing it yourselves, then I'm telling this to 20 everybody. So I'm not picking on any one person 21 but you know, come forward with it and talk about 22 it instead of calling agencies and stuff. That's

(202) 234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. 85 1 my point. 2 If you know somebody doing that, then 3 tell them to stop doing it as well. We don't 4 need this kind of help. DuPont will shut plants 5 down for this. I mean, there's no doubt about 6 it, they'll shut them down for good. I've seen 7 it happen before. 8 You know, it just takes one, one iota 9 of information. Next thing you know, it grows up 10 to this big problem and you can get a lot of 11 people wrapped up in looking into it. And it 12 just becomes a big cluster. And you know, I kind 13 of want this plant to keep running. I'm sure you 14 guys do too because we all get paid, right? 15 I'll skip to his next comment. But 16 you know, I think for us to be sitting looking at 17 the outside and saying man, I wish we could have 18 done something back when, you know, when this 19 stuff originally happened instead of waiting for 20 DuPont to come and shut this plant down because 21 we're not, you know, not a safe operation. 22 That was a transcript of actual audio

(202) 234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. 86 1 recording from the plant manager himself. We had 2 several pieces of evidence like this in our case. 3 The evidence in our case also includes video 4 footage that depicts disturbing amounts of toxic 5 gas leaking from the Darrow Burnside facility 6 shortly after a shut down that was taken to 7 repair leaking equipment. 8 These videos clearly show that repair 9 efforts failed. This footage was accepted into 10 evidence in our case and no witness seriously 11 challenged these videos that depict what former 12 and current operators identify as toxic SO3 gas 13 leak. There are several videos that I have made 14 available to the Board including footage from 15 cameras inside the Burnside facility. 16 There should be no further concealment 17 of information involving DuPont, they do that 18 enough. I ask the Board to be swift and thorough 19 in how it evaluates the making public of this 20 information the Board obtained from DuPont. This 21 information is key to enable the industry to 22 progress beyond the current state of the industry

(202) 234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. 87 1 and to progress beyond incidents like La Porte. 2 Thank you. 3 MEMBER ENGLER: Thank you very much. 4 Are there any other comments from within the room 5 here today? 6 MEMBER EHRLICH: There are two other 7 people, the Tisnados. The wife of Gilbert 8 Tisnado and the father of Gilbert and Robert 9 Tisnado. 10 (Telephonic interference.) 11 MICHELLE TISNADO: -- before making 12 vital changes to ensure the safety of the workers 13 as well as the public would not only be a 14 mistake, but would also be saying that the four 15 lives that were lost including my husband Gilbert 16 and my brother-in-law Robert, didn't matter. 17 I'm concerned not only for the workers 18 but their families as well. I do not want other 19 families to have to go through what our families 20 have gone through and are continuing to go 21 through. It is unbelievable and sickening to see 22 DuPont's disregard for the four lives that were

(202) 234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. 88 1 lost on that dreadful Saturday, November 15, 2014 2 at approximately 3:30 a.m. 3 DuPont claims it's motto is safety 4 first, but it is obvious that DuPont is putting 5 collection first since they are trying to reopen 6 the unit without making the necessary changes to 7 make it safer for the workers. 8 The changes that should take place 9 should have been made a long time prior to the 10 fatal incident that occurred due to gross 11 negligence which would have prevented these 12 tragic deaths that DuPont is now refusing to make 13 to prevent future loss. 14 The investigators with the Chemical 15 Safety Board and the other agencies investigating 16 the accident have worked diligently to find 17 recommendations that would ensure the safety of 18 workers as well as the public which I 19 wholeheartedly appreciate. It appears that 20 DuPont is trying to bypass these recommendations 21 in order to reopen the unit and start production 22 back up.

(202) 234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. 89 1 It appears to me that DuPont has not 2 learned anything from this tragedy and only cares 3 about profit. I sincerely hope that you will 4 deny DuPont's request to reopen the (inaudible) 5 unit before the required safety measures and 6 changes are implemented. Please allow the report 7 to be released and approve the urgent 8 recommendations as soon as possible. Thank you 9 for your time. 10 MEMBER ENGLER: Thank you very much. 11 Is there anyone on the phone who would like to 12 make a comment? 13 OPERATOR: Once again, if you have a 14 comment, please press star then 1 from your 15 touchtone phone. It looks like Brent Coon from 16 USW is on line with a question. Your line is 17 open, please go ahead. 18 BRENT COON: Good morning ladies and 19 gentlemen. Thank you ma'am. Yeah, our firm and 20 just for clarification, we are speaking on behalf 21 of not the USB, the USW they have their own 22 counsel, but we are designated counsel in several

(202) 234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. 90 1 states including Texas. I think a number of you 2 guys with the CSB know of the work our firm has 3 done in the petrochemical industry, most notably 4 in Texas City where we were lead counsel. 5 Real briefly, Don for you and the 6 others, I was not aware that the meetings this 7 morning would include commentary on some of the 8 recommendations with respect to the reporting 9 systems at BP. We are intimately familiar with a 10 lot of the tracking devices, traction systems, 11 and MOTs there. 12 We would like to weigh in further on 13 that matter at a later date if we can be steered 14 to the actual report that Mark and others may 15 have generated on that. Going specifically, and 16 just real briefly for background gentlemen, we 17 represent clients in the DuPont incident, the 18 Exxon matter, many of the BP Texas City, and are 19 the major stakeholder in the Macondo incident 20 with about 10,000 clients. 21 I want to first very briefly comment 22 on some early criticism on the meeting this

(202) 234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. 91 1 morning regarding the CSB and their agenda. I 2 was disappointed that the West final report is at 3 least for the time being going to be suppressed. 4 My firm has been intimately involved 5 in the petrochemical industry for 30 years. We 6 work very closely -- 7 MEMBER ENGLER: For a point of 8 information, could you clarify that comment 9 again? 10 BRENT COON: Yes. We're disappointed 11 that there were some early technical criticism of 12 the CSB investigators and some of the reported, 13 what I read to be from Flint (phonetic) on their 14 activities. We've always found the CSB to be -- 15 MEMBER ENGLER: I'm sorry, in which 16 investigation? We're talking about DuPont. 17 BRENT COON: I think that was just a 18 comment generally as we were going through the 19 West report. 20 MEMBER ENGLER: First of all, just to 21 clarify, I'm not aware of any such information. 22 Secondly, comments in this part of the comments

(202) 234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. 92 1 section are restricted and focused on the DuPont 2 situation. At the end of the meeting, there will 3 be an opportunity for any other comments about 4 any issues that the public wishes to raise. 5 BRENT COON: Okay, thank you. What we 6 would like to specifically address with DuPont at 7 this time is there's a parallel investigation by 8 a number of attorneys on behalf of claimants, 9 some of whom spoke this morning, regarding our 10 investigation through the civil system which 11 sometimes provides supplemental information 12 regarding the incidents. 13 But we rarely get up to speed on the 14 cases as quickly as the CSB due to the slow 15 process that it takes for the litigation in the 16 civil arena to move forward. As a consequence, 17 it's very beneficial for us in our parallel 18 investigations to have access to investigations 19 that are already being committed to by OSHA and 20 CSB. 21 We appreciate very much that Mr. 22 Tillema and others have engaged the victims and

(202) 234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. 93 1 counsel on some briefings. But we would like to 2 have better access to the actual documentation. 3 Most particularly this would include, for 4 instance, the 40 page report or urgent 5 recommendations to DuPont. 6 We had, in discussions with CSB 7 investigators, thought that this would be 8 accessible to the victims and counsel. There 9 appears to be some questions with respect to 10 whether or not that type of information can be 11 disseminated to them. So we would like some 12 clarification of that. 13 And to the extent there is 14 uncertainty, we would request that the CSB 15 resolve that in favor of the liberal construction 16 of the dissemination of those types of 17 communiques to the victims as part of an 18 extension of the victims interaction program. 19 Other than that, we concur 20 wholeheartedly with all of the findings that have 21 been made to date. They're very consistent with 22 what we have found in our independent

(202) 234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. 94 1 investigations. And we look forward to 2 continuing to work with the CSB and other 3 investigative agencies moving forward. 4 As others have said, they do an 5 excellent job at root cause analysis. And 6 frankly, we think that they tend to give too much 7 benefit of the doubt to the industry regarding 8 the lessons learned which really is just, in our 9 opinion, renewed reminders. 10 We concur with the sentiments of some 11 of the victims earlier that most of these process 12 safety management failures throughout the 13 industry are things that the industry is well 14 aware of. And they put their cost benefit 15 analysis and ROI factors in, which put everyone 16 at additional risk. 17 So we would like to see the CSB be 18 more proactive and to have more enforcement 19 capabilities. Because frankly, the industry self 20 regulates and OSHA, EPA, and CSB do not really 21 have the staffing and resources enforcement that 22 we would like all of them to see. Thank you.

(202) 234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. 95 1 MEMBER ENGLER: Thank you for those 2 comments. I'd now like to recognize Gilbert 3 Tisnado. Thank you for your patience here. 4 GILBERT TISNADO: I'd like to give 5 thanks to my sons. This is my youngest, my baby. 6 This is my eldest my firstborn. I haven't gotten 7 (inaudible). I know that accidents will happen 8 especially in plants. 9 But to me, the CSB Board was like 10 doctors coming to check out a sick plant. They 11 went through that sick plant, they found the 12 problems, they looked at them, they made 13 recommendations. I believe that, I don't think 14 anything should happen until their 15 recommendations are taken care of, until the 16 plant is 100 percent safe for everyone. 17 I mean life and limb is the most 18 important thing. I know money is important. 19 It's so sad for a man to go to work in the 20 morning and not make it home that evening. 21 That's all I want to say, is that we need to make 22 this public, let it go and let people see, learn.

(202) 234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. 96 1 If you've got a problem, fix it. Not 2 try to sweep it anywhere, not try and cover 3 anything. Just make it open, confront it, and go 4 with it. 5 MEMBER ENGLER: Thank you. Can I ask, 6 are these your personal photos that you're taking 7 back to Texas with you? 8 GILBERT TISNADO: Yes. They're my 9 daughter-in-law's. 10 MEMBER ENGLER: One thing that I 11 remember from the recent, well the leadership at 12 OSHA took over is that they changed I believe 13 their conference room. Some of you may have been 14 in it. And the conference room, I forget what 15 they had before, but the conference room at OSHA 16 now has photographs of people who lost their 17 lives in preventable industrial incidents. 18 I wonder, even though we feature 19 people, family members, victims in our videos, 20 whether we shouldn't have photos in this office. 21 I frankly, to be perfectly blunt, have gotten 22 caught up in a lot of the difficulties,

(202) 234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. 97 1 challenges, intrigue here. I think it would help 2 me to have photos to see every day of why we do 3 this work and of why CSB is in existence. 4 So I don't know if this is the best 5 way to do it -- sure and we will certainly post 6 them to remind us all. Thank you again. Other 7 comments from those on the telephone? I'm sorry, 8 did I say I'd come back to you? I did I think. 9 Go ahead sir. 10 MR. SUTTON: My name is Ian Sutton. 11 I have two technical questions about the 12 interpretation. Of the 300 employees, how many 13 were contract workers and how many were DuPont 14 employees? 15 The second question, you say the PHA 16 techniques were the before and after. What were 17 those techniques? What were they doing and what 18 did they change to? 19 MEMBER ENGLER: Normally, to be frank, 20 this is not a question and answer opportunity. 21 But since you raised it through the Chair, I will 22 bounce them from myself. Dan, if you would like

(202) 234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. 98 1 to respond to that. 2 MR. TILLEMA: Sure. So the first 3 question was the employees, those are DuPont 4 employees. There are other contractors on site 5 but that's not included in that number. Off the 6 top of my head, I do not have the number of 7 contractors on the site. 8 The initial PHAs were what if 9 checklist PHAs done with large notes and 10 methodology. The new PHAs is a DuPont technique 11 called a structured what if. They've published 12 at least one paper that I'm aware of on that 13 methodology. 14 MEMBER ENGLER: Are there any other 15 comments from those joining us on the telephone 16 or in the audience? 17 OPERATOR: At this time, we have no 18 audio questions or comments. 19 MEMBER ENGLER: Okay. I shall note 20 for the record that DuPont has indicated that 21 they will submit written comments. Member 22 Ehrlich, do you have any further comment?

(202) 234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. 99 1 MEMBER EHRLICH: No I don't at this 2 time. 3 MEMBER ENGLER: I would just like 4 briefly to say the following. This situation is 5 deeply troubling. Not only do we have this 6 incident but as Mr. Tillema talked about, there 7 have been prior incidents that CSB has 8 investigated. 9 We're now looking at a situation where 10 DuPont is thinning off and splitting up. That 11 certainly raises questions about what happens 12 when you have management subdividing and how you 13 deal with a situation like that within one, 14 essentially one standard facility around the 15 fence line. 16 We're looking carefully at the two 17 sets of citations that federal OSHA issued. 18 Including the fact that OSHA put DuPont into the 19 severe violators program. This is a very serious 20 situation. 21 So the question arises, what are the 22 opportunities for CSB? What can we do? Just to

(202) 234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. 100 1 clarify again, we are not a regulatory agency. 2 We have no statutory authority to say, before the 3 facility or a section of the facility can resume 4 production, the following steps must be taken. 5 With that said, we do have a rather 6 important, I guess the phrase might be bully 7 pulpit, to highlight problems, to suggest 8 solutions, and to vigorously advocate for safety 9 and prevention. I'm encouraged that DuPont has 10 indicated that they're not starting up the 11 facility on the original date that they had 12 suggested which was the August 15th date, 13 correct? 14 We don't know when they do plan to 15 start up again. I think that the findings 16 suggest that there needs to be a very, very 17 serious and prompt response by DuPont management 18 to what the staff of the CSB have found so far. 19 And there needs to be a very, very serious 20 dialogue about ensuring that preventive measures 21 are taken within a short period of time so that 22 the possibility of this type of tragedy repeating

(202) 234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. 101 1 itself at that facility, or frankly, in terms of 2 impact at other DuPont facilities is taken very, 3 very seriously. 4 I think I can pledge on behalf of 5 Member Ehrlich and myself that we're deeply 6 concerned about this. But that the proof of the 7 direction will not be just in written statements 8 or press releases but actual changes and 9 implementation of safety precautions, preventive 10 measures, assurance of whistleblower protection 11 at DuPont facilities. 12 So with that, unless there's any 13 closing comments by the investigators in this 14 case, I would like to close that part of the 15 discussion on DuPont. And to assure the family 16 members that we will be taking this very 17 seriously and following up. 18 By the way, I would like to meet with 19 the family members at the conclusion, if I could, 20 for a few minutes just to talk informally for a 21 couple of minutes. And with that, it's now 22 11:30. Why don't we take a 10 minute break and

(202) 234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. 102 1 resume at 11:40. So we'll resume promptly at 2 11:40. 3 (Whereupon, the above-entitled matter 4 briefly went off the record.) 5 MEMBER ENGLER: Thank you all. At 6 this point we will reconvene. 7 MS. MCCORMICK: Chris, we're going to 8 get started again. 9 OPERATOR: Okay, your line is open. 10 MEMBER ENGLER: Next on our agenda is 11 a presentation by both Veronica Tinney from our 12 Recommendations Office and Don Holmstrom on the 13 status of California Process Safety Management 14 Recommendations. 15 MS. TINNEY: All right, thank you. So 16 first I'm going to start with talking about our 17 overall recommendations that are currently under 18 Board vote. The Board is currently reviewing the 19 status change of 16 of our recommendations and 20 that's outlined on a handout that is actually out 21 in the hall. So you can review all of the ones 22 that are currently under Board vote.

(202) 234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. 103 1 This vote is taking place by notation 2 item which just means it's done by a paper vote. 3 And that voting period takes place from July 14th 4 to July 28th. These recommendations include six 5 recommendations from the Chevron investigation, 6 four from the AL Solutions investigation, and one 7 each from the Texas Tech University MSG 8 (inaudible) carbide and (inaudible). 9 The six Chevron recommendations 10 include one to the Governor and State 11 Legislature, two to Contra Costa County, and 12 three to the City of Richmond. These 13 recommendations have been suggested by staff to 14 the Board on open discussible or alternate 15 actions which just indicates that the recipient 16 has made progress towards implementing the CSB's 17 recommendations. 18 Additionally, the recommendations 19 under review also include one potential closed 20 acceptable alternative action to the American 21 Petroleum Institute as a result of the Valero 22 Refinery fire in 2007.

(202) 234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. 104 1 So I'm going to talk a little bit more 2 about those specific Chevron investigation 3 recommendations that I just mentioned that are up 4 for Board vote. As a result of the Chevron 5 investigation which occurred on August 6, 2012 in 6 Richmond, California and caused 50,000 people in 7 the surrounding communities to seek medical 8 treatment, the CSB makes recommendations at both 9 the local level to the city of Richmond and 10 Contra Costa County and to the State of 11 California to improve its process safety 12 management program. 13 Like I mentioned, there's six that are 14 currently in open acceptable or alternate action 15 as recommended to the Board that they're voting 16 on right now. Several of these include efforts 17 made by the City of Richmond and Contra Costa 18 County to revise industrial safety ordinances or 19 ISOs to improve process safety. 20 So those are the ordinances that deal 21 with process safety in those two jurisdictions. 22 For example, both ISOs added language regarding

(202) 234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. 105 1 reducing risk to the greatest extent feasible, 2 adding language relating to inherently safer 3 systems analysis, and additional safeguards or 4 process hazard analyses. 5 The CSB commends the City of Richmond 6 and Contra Costa for initiating changes to its 7 ISOs to address the CSB recommendations and looks 8 forward to working with both to ensure that the 9 intent of these recommendations is fully met. 10 And now Mr. Holmstrom is going to talk about the 11 recommendations that we made to California 12 regarding its process safety management. 13 MR. HOLMSTROM: Thank you Veronica 14 Tinney and I appreciate all the great work that 15 you've done by our recommendations group on these 16 California PSM recommendations and the great 17 cooperation we had working together to further 18 these recommendations. Thank you for your hard 19 work. 20 Also out of the Chevron investigation, 21 the CSB issued three reports, two of which 22 contained recommendations to the State of

(202) 234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. 106 1 California to make specific improvements to their 2 process safety management regulations. The State 3 of California in part in reaction to the incident 4 itself as well as to CSB recommendations 5 initiated changes to their general industry 6 safety order. And promulgated a draft, over time 7 several drafts, a document entitled Process 8 Safety Management for Refineries. 9 So this is specific process safety 10 changes that apply to petroleum refineries in the 11 State of California. In September and October of 12 2014 and May of 2015, the California Department 13 of Industrial Relations released these drafts of 14 the proposed rule for public comment, Versions 1, 15 2, and 4.5, respectively. 16 The CSB provided oral and written 17 comment on the June 22, 2015, on that date to the 18 California Department of Industrial Relations or 19 DIR, 4.5, which is the latest version dated May 20 26, 2015. These comments are available under the 21 open government portion of our website and will 22 be briefly summarized as follows.

(202) 234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. 107 1 The CSB has previously reviewed 2 Versions 1 and 2 of the draft regulation and 3 expressed that it was greatly encouraged by the 4 DIR and Cal/OSHA's leadership in advancing 5 process safety management protections for workers 6 and communities. The CSB has also stated that 7 California can be a model. 8 We know that there's obviously 9 currently the executive branch is reviewing 10 reforms in terms of process safety management. 11 That California can be a model for reforms that 12 are being considered at the federal level by the 13 Executive Order 13650. 14 However, the CSB finds that Version 15 4.5, in our view based on the recommendations 16 that the Board adopted both in our first report 17 and second report to the State of California, 18 does not go far enough to require real risk 19 reduction to prevent major accidents. 20 Without risk reduction measures for 21 refineries to work towards, and with no clear 22 role for the regulator, it is unclear how the

(202) 234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. 108 1 draft proposed rule is an improvement upon PSM 2 regulations that are currently in place. Some of 3 the major concerns that the CSB has are as 4 follows. 5 The first is a concern that the 6 majority of the language that's requiring risk 7 reduction be implemented to the greatest extent 8 feasible has been removed between Draft 2 and 9 4.5. So the current draft has most of that 10 language removed. And as we had pointed out, 11 some of that language, the way it's phrased, it's 12 not clear that it would apply to remedial actions 13 or recommendations or corrective actions. 14 The remaining performance measures are 15 inconsistent, with the CSB counting ten different 16 performance goals referenced in the draft 17 proposed rule. Removing the central feature 18 returns PSM to a list of required activities that 19 lack real goal setting attributes of risk 20 reduction. 21 Our concern is that PSM standard is 22 intended to be a goal setting standard but lacks

(202) 234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. 109 1 real effective goals that are established with 2 the standards. Without clear performance 3 measures, the CSB is concerned that refineries 4 will satisfy the intent of the regulation by 5 submitting the required process documentation but 6 without actually reducing risk of major 7 incidents. 8 Preventative role of the regulator, 9 there's very little language in 4.5 that relates 10 to the role of the regulator in helping to 11 prevent potentially catastrophic chemical 12 incidents. Version 2 allowed the division, 13 that's the earlier version, to review submitted 14 hazard control analysis, HCAs. 15 In addition, where the division 16 identifies deficiencies, the division can require 17 the employer to submit further information, 18 perform a real analysis, and submit a revised HCA 19 and modify the HCA to incorporate changes 20 proposed to for example, inherent safety 21 measures. 22 Version 4.5 eliminated this language,

(202) 234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. 110 1 removing the ability of the regulator to ensure 2 that the employer has properly controlled hazards 3 prior to a potential catastrophic incident. And 4 we want to emphasize that the process safety 5 management standard is intended to focus on major 6 accidents, on preventing potentially catastrophic 7 incidents occurring. 8 The inspection strategy that focuses 9 on response to incidents, complaints, and 10 referrals is not an effective strategy for 11 potentially catastrophic incidents. It's not 12 acceptable for a catastrophic incident to occur 13 and expect change to happen in response to an 14 investigation of that incident solely. There has 15 to be preventative inspections, preventative 16 actions by the regulators. 17 And that certainly was the intent of 18 the original compliance directive that OSHA 19 issued in response to the PSM standard back in 20

  1. The CSB believes that the regulator can

21 play a critical preventative role in reducing 22 risks of accidents through inspections and audits

(202) 234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. 111 1 to ensure that refineries are adequately reducing 2 risk. 3 Pursuant to its recommendations, the 4 CSB believes language should be included that 5 outlines the role of the regulator. Conclusions, 6 the CSB appreciates the substantial effort 7 involved in the development of the draft proposed 8 rule in implementing our recommendations. 9 However, the CSB is concerned that the 10 current draft, if finalized without the 11 recommended changes, will not be effective in 12 reducing risk of incidents at refineries. The 13 CSB urges the DIR to make the previously 14 mentioned changes prior to finalizing the 15 proposed rule in addition to those described in 16 our written comments submitted at the June 22nd 17 meeting available on our website. 18 The CSB welcomes any additional 19 conversation on how to improve the draft proposed 20 rule and looks forward to further dialogue on how 21 to improve refinery safety in California. Thank 22 you.

(202) 234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. 112 1 MEMBER ENGLER: Thank you. Member 2 Ehrlich, do you have any questions? 3 MEMBER EHRLICH: I do not, thank you. 4 MEMBER ENGLER: I have a question. Is 5 California the leading state, in a sense, doing 6 this? Are there efforts in other states? Or is 7 California really the one path that's being gone 8 down, that's being explored? Is there anything 9 else going on in other states where this is 10 really critical? 11 MR. HOLMSTROM: I apologize, I meant 12 to say Member Ehrlich a minute ago, I mean Member 13 Engler. 14 MEMBER ENGLER: Well we both begin 15 with E. 16 MR. HOLMSTROM: Member Engler, 17 California I think, because they put out a draft 18 and they are pursuing these reforms, I think 19 California is leading, as we've said, is leading 20 the country in trying to improve PSM. As we 21 know, as we've said in several reports, the PSM 22 standard has not be substantively changed.

(202) 234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. 113 1 There have been some minor changes 2 relative to, you know, hazard communication. But 3 it has not been substantively changed since it 4 was promulgated in the early '90s. So we think 5 California is, as we said in the reports that 6 have been issued by the Board, we think that the 7 PSM standard needs to be strengthened based on 8 the number of incidents occurring, particularly 9 in oil refineries. 10 California is certainly taking the 11 initiative of being proactive and moving that. 12 There are other arenas. Veronica mentioned 13 Contra Costa County in California which is also 14 in California. But also the State of Washington, 15 we understand has been meeting with the State of 16 California to try to understand their process 17 because we made similar recommendations to the 18 State of Washington. 19 So there's also activity in the State 20 of Washington pursuant to the recommendations we 21 made in the Tesoro and Anacortes investigation 22 that was issued about a year and a half ago.

(202) 234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. 114 1 MEMBER ENGLER: Okay, thank you. And 2 thank you both for your work. 3 MEMBER EHRLICH: Can I change my mind? 4 MEMBER ENGLER: Sure. 5 MEMBER EHRLICH: Did they not, in 6 California put on a whole group of inspectors to 7 follow up and enhance the inspection program? 8 What, they put on 13, was it? 9 MR. HOLMSTROM: Right. In response 10 to, again CSB recommendations as well as the 11 incident itself that occurred at the Chevron 12 refinery, the State of California has undertaken 13 several actions to improve process safety 14 including the hiring of a number of additional, 15 not only inspectors inspecting for TSM, but who 16 have more technical qualifications. 17 A number of them, I think a majority 18 of them are engineers. So the CSB, in our 19 reports, have noted that it's important that the 20 technical qualifications of the people who 21 inspect highly technical process plants, they 22 have equivalent technical backgrounds and

(202) 234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. 115 1 experience of those operating the plant so they 2 can understand and play a preventative role in 3 that process. 4 Much like, for example, the Nuclear 5 Regulatory Commission hired, $1 billion budget 6 entity that's hired really hundreds of nuclear 7 engineers to do, to look at those highly 8 technical issues there. 9 MEMBER EHRLICH: Are you familiar with 10 the SBREFA efforts? Have you heard about that? 11 It's coming out of small business and the 12 Executive Order. Rather than ask you if you've 13 heard of it, I was in a meeting where the fellow 14 that runs it commented on it. 15 He says that the two big players in 16 there are OSHA and EPA, and he thinks they're 17 going to have legislation or formal documentation 18 in no greater than 120 days to address a lot of 19 these issues. Veronica, you shake like you've 20 heard of it. 21 MS. TINNEY: Yes, and you can correct 22 me, but OSHA is currently conducting its SBREFA

(202) 234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. 116 1 panel on PSM, further additions to PSM. 2 MEMBER EHRLICH: SBREFA, just for 3 those any of who you are not familiar with it, is 4 a process by the Small Business Administration to 5 basically, structure panels of business, small, 6 medium, and perhaps larger as well to review the 7 impact and the cost and benefits of particular 8 regulations. 9 It's an extensive and lengthy process 10 that has been used to identify issues but in my 11 view, frankly, has been also used to slow down 12 the needed adoption of safeguards. So it has its 13 benefits, but it also has its challenges to deal 14 with. 15 MEMBER ENGLER: Thank you. If there's 16 any public comments, we'll defer public comments 17 on this presentation because we do have another 18 public comment period coming up. Veronica, 19 you're up again on Laboratory Safety Guideline 20 Recommendations to the American Chemical Society. 21 MS. TINNEY: Sure. So one of the one 22 recommendations from that that we would like to

(202) 234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. 117 1 highlight is the recommendation to the American 2 Chemical Society who is here with us today. So I 3 look forward to their comments. 4 This was made out of a result of the 5 Texas Tech University laboratory explosion which 6 in 2010, severely injured a graduate student 7 there. As part of the investigation, the CSB 8 found that a comprehensive hazard evaluation 9 guidance for laboratories did not exist. And as 10 a result, the Board recommended that ACS develop 11 guidance for assessing and controlling hazards in 12 research laboratories. 13 The full text of the recommendation 14 which is Number 2010-05-I-PX-R2 reads, develop 15 good practice guidance that identifies and 16 describes methodologies to assess and control 17 hazards that can be used successfully in a 18 research laboratory. 19 So in terms of any CSB actions, the 20 CSB issued this recommendation in October 2011 21 and the ACS responded in December 2011 indicating 22 that they would not only create the guidance

(202) 234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. 118 1 documents that we recommended, but that they 2 would also initiate a task force on safety 3 culture and draft a document to aid institutions 4 on establishing a safety culture at research 5 institutions. 6 As a result of that, the Board voted 7 to designated it as open acceptable action in May 8 of 2012. The ACS published its first report 9 which was entitled Creating Safety Cultures in 10 Academic Institutions, A Report of the Safety 11 Culture Task Force of the ACS Committee on 12 Chemical Safety in December of 2012. 13 Then in September 2013, ACS completed 14 the draft of its guidelines which is entitled 15 Identifying and Evaluating Hazards in Research 16 Laboratories, Guidelines Developed by the Hazards 17 Identification and Evaluation Task Force of the 18 American Chemical Society's Committee on Chemical 19 Safety. 20 Even though, at that time, we decided 21 that generally the document met the intent of the 22 recommendation, we did not put it up for Board

(202) 234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. 119 1 vote until the document was finalized which 2 happened on May 28, 2015. While those documents 3 that were created are consistent with the 4 recommendations, we're just going to focus on the 5 second document which pertains more to our actual 6 recommendations. 7 So a little bit about the document, 8 the guidance document. The scope says that it's 9 supposed to apply and provide guidance for 10 laboratory researches including all levels of the 11 institution, undergraduate students, graduate 12 students, post-docs, instructors, clinical 13 investigators, technicians, and chairs. 14 The document identifies and describes 15 five different methodologies for identification, 16 analysis, and selection and control of hazards. 17 The document discusses the strengths, 18 limitations, and potential applications of five 19 of those methodologies which include chemical 20 safety, levels of control banding, job hazards 21 analysis, what if analysis, checklists, and 22 structured development of standard operating

(202) 234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. 120 1 procedures. 2 The document also addresses the 3 variable nature of work conducted in research 4 laboratories and states that change should be 5 evaluated against the current hazard analysis to 6 determine if the hazard now continues to be 7 sufficient. 8 It also provides practical examples of 9 changes that might require that type of analysis 10 and factors the effect recognition such as an 11 individual perception of risk. And provides 12 organizational strategies for ensuring the 13 recognition and appropriate response to changes 14 in the research laboratory. 15 Consistent with the CSB's case study, 16 the document also emphasizes the importance of 17 near misses and close calls and discussing those 18 incidents. The ACS publication also emphasizes 19 the importance of striving for continuous 20 improvement and using lessons learned to inform 21 future hazard analysis. 22 The document also references the first

(202) 234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. 121 1 publication which was the Creating Safety 2 Cultures in Academic Institutions. So our 3 conclusion and what we recommended to the Board, 4 we decided that this should be a CE 5 recommendation where the call for ACS to develop 6 good practice guidance was met. 7 As evidenced by the various aspects 8 that I just talked about, the ACS guidance 9 finalized this year is not only extremely 10 thorough but we believe that it actually goes 11 above and beyond what we actually recommended. 12 Further, ACS communicated to us that following 13 the release of this, they will create an online 14 portal. 15 It's a very lengthy document so they 16 intend to make it more user friendly and 17 searchable. For this reason, we have, like I 18 said, recommended that it be closed exceeds 19 recommended actions. We are very pleased that 20 this report and recommendation has been 21 implemented and that there now exists a 22 comprehensive guidance to help evaluate and

(202) 234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. 122 1 control hazards. And that concludes our staff 2 recommendation. 3 MEMBER ENGLER: Thank you. Member 4 Ehrlich, any questions? 5 MEMBER EHRLICH: No, I don't have any 6 questions. Nice job, thank you. 7 MEMBER ENGLER: I'm very pleased to 8 hear that a recommendation is proposed, that 9 we're potentially commending the American 10 Chemical Society for exceeding what we 11 recommended which is a nice thing to happen. 12 Just to be clear, we're not doing all of our 13 business in public. 14 This is one issue that's currently 15 pending in a set of notation votes that we do 16 through reviewing documents and indicating 17 whether we support them, oppose them, calendar 18 them for a public meeting, or not vote. That 19 process is currently pending. I'm optimistic 20 that my vote on this last matter will be 21 affirmative. So thank you very much for that. 22 Before public comment, we have one

(202) 234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. 123 1 other item of business. And this is a proposal 2 to remove the September business meeting from the 3 schedule and change the time. On May 6th, the 4 Board voted on a schedule of upcoming public 5 business meetings. The next meeting was 6 scheduled for September 16th and the following 7 meeting was scheduled for October 21st. 8 However, because the Interim Chair, in 9 his brilliance, figured out that the office was 10 moving during that precise time, and that things 11 like the IT system and the hook ups to remote 12 commenting by people on the phone, would be 13 difficult if not impossible. And we had a 14 subsequent meeting in October that basically, it 15 added up to, based on staff recommendations, that 16 we would like to remove the September 16th public 17 business meeting from the schedule. 18 I should note that under our new rules 19 where we said we have to have four public 20 business meetings annually in Washington D.C., 21 we're meeting that requirement through the 22 meetings we've had per quarter. We will still

(202) 234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. 124 1 meet that requirement by an October meeting. 2 Additionally, folks on the west coast 3 and I apologize for being so New Jersey centric, 4 all this Washington, national stuff is new to me. 5 They pointed out that getting up at 6:30 in the 6 morning for a CSB meeting was not the funnest 7 thing. 8 So this motion will basically says 9 that our September 16th business meeting is 10 cancelled and that we will change the start time 11 of future meetings to 1:00 p.m. Eastern Time. I 12 make that as a motion. Do I have a second? 13 MEMBER EHRLICH: Second. 14 MS. MCCORMICK: I'll call the role. 15 On the motion to remove the September 16th public 16 business meeting from the schedule and change the 17 time of future meetings to 1:00 p.m. Eastern, 18 Member Ehrlich? 19 MEMBER EHRLICH: Aye. 20 MS. MCCORMICK: Member Engler? 21 MEMBER ENGLER: Aye. 22 MS. MCCORMICK: Motion passes.

(202) 234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. 125 1 MEMBER ENGLER: As our second to final 2 agenda item, this is an opportunity for public 3 comment on any issues that we've addressed today, 4 other concerns that the public may have. 5 Comments are, of course, very much encouraged. 6 Please do not make negative comments about 7 specific individuals inside or outside the CSB. 8 Please try to keep remarks to approximately three 9 minutes. 10 The floor is open for comments. We do 11 have a comment sign up list from five people who 12 are here. I'll start with David Sheppard from 13 ATF. Is David Sheppard on the phone by any 14 chance? Walking down the street on his cell 15 phone? No, okay. 16 Dan Heenan from also ATF. Is he here? 17 No, okay. Katie Vassalli from ILTA. 18 MS. VASSALLI: Good afternoon. I am 19 Katie Vassalli, the Manager of Member Education 20 Services for the International Liquid Terminals 21 Association. ILTA represents owners and 22 operators of above-ground storage tank facilities

(202) 234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. 126 1 that store petroleum products, chemicals, and 2 other liquids. 3 Our members operate in all 50 states 4 and in 39 countries. I thank the Board for the 5 opportunity to speak today regarding the agency's 6 report on the October 2009 CAPECO incident. My 7 comments reflect those previously provided by 8 ILTA and serve to support the conclusions 9 expressed by Board Member Ehrlich earlier this 10 morning. 11 CAPECO is not an ILTA member. And 12 ILTA supports the findings concluded in the draft 13 report. The agency's findings clearly laid out 14 the case that the CAPECO facility was poorly 15 managed and had a long and troubled history of 16 compliance violations. 17 Yet, rather than addressing the 18 problems inherent with a known repeat offender, 19 the draft report's recommendations call for an 20 expansion of OSHA's and EPA's regulatory 21 authority. Thereby indicting an entire industry 22 that, as Member Ehrlich's remarks reflect, have

(202) 234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. 127 1 routinely demonstrated flawless safety record 2 while complying with existing regulatory 3 requirements and industry standards. 4 In fact, there is nothing in the draft 5 recommendation to tackle how to drive compliance 6 among repeat violators. In light of the fact the 7 report was not finalized today, ILTA encourages 8 the CSB to use this as an opportunity to revise 9 the recommendations so that they can effectively 10 address the root causes of the incident. 11 As outlined in our June 17 comment 12 letter to the Board, ILTA offered three 13 substitute recommendations. One, recognize the 14 role that industry standards have in fostering 15 compliance with existing regulations. 16 Two, promote the use of management 17 systems as a tool for improving operational 18 integrity. And three, prompt the regulatory 19 agencies to assess the effectiveness of their 20 compliance verification activities. Thank you 21 again for the opportunity to provide comment 22 today and for your further consideration in this

(202) 234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. 128 1 matter. 2 MEMBER ENGLER: Thank you for your 3 comments. Next will be Stephen Crimaudo from the 4 American Petroleum Institute. 5 MEMBER EHRLICH: I think he left too. 6 MEMBER ENGLER: Okay. Next on, do we 7 have anyone on the phone, on the telephone line? 8 OPERATOR: Once again, if you have a 9 comment, please press star then 1 from your 10 touchtone phone. And currently we have no 11 comments pending. Pardon me, I'm sorry, it looks 12 like we just got a comment. Celeste Monforton 13 from the Safety Board is on line with a comment. 14 Your line is open, please go ahead. 15 CELESTE MONFORTON: Hello, this is 16 Celeste Monforton. Can you all hear me? 17 MEMBER ENGLER: Yes. 18 CELESTE MONFORTON: Okay, great. 19 Thank you so much. I am a public health and 20 worker safety consultant. I live in San Marcos, 21 Texas. I had two comments. The first was I was 22 really pleased to hear Board Member Engler

(202) 234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. 129 1 discuss having photos of workplace fatality 2 victims posted at the Chemical Safety Board's 3 headquarters. 4 I want to give credit to an 5 organization called United Support and Memorial 6 for Workplace Fatalities. They are the 7 organization that provided the photos to OSHA 8 which appear inside of their conference room 9 which is what Board Member Engler was referring 10 to. 11 Just briefly, I was troubled, I was 12 extremely troubled to hear the statement from 13 Board Member Ehrlich regarding the CAPECO 14 recommendations. And specifically his opposition 15 to those calling for new OSHA and EPA 16 regulations. 17 I took some time over the last couple 18 weeks to look at previous recommendations by the 19 Chemical Safety Board, I counted more than 700. 20 Less than 40 of them, only about 5 percent, were 21 actually calling for regulations at the local, 22 state, and federal agencies.

(202) 234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. 130 1 I see it as, if anything the CSB has 2 been missing its opportunity to use its authority 3 to identify and make recommendations on gaps in 4 worker safety regulations. I'm speaking from my 5 own experience as someone who was an investigator 6 of the Sago Mine disaster in 2006 which killed 12 7 coal miners. And the 2010 Upper Big Branch 8 explosion which killed 29 coal miners. 9 Our investigation team was appointed 10 by the Governor of West Virginia. We were 11 charged with identifying the factors that caused 12 the disasters and to make recommendations so it 13 didn't happen again. 14 Some of our recommendations were 15 directed to the industry, you know, outreach 16 activities and training, and to research 17 institutions. But we did identify inadequate and 18 outdated mine safety regulations that needed to 19 be addressed. And it would have been a 20 dereliction of our duty and an abandonment of our 21 duty had we scrapped those regulatory 22 recommendations.

(202) 234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. 131 1 Board Member Ehrlich talked about, you 2 know, recommendations that might, regulations 3 that might be burdensome to the industry or 4 because our agencies were overstretched. Well 5 that's not an appropriate to not make those 6 recommendations. And it's not for the Chemical 7 Safety Board to make those determinations. 8 It's for the Chemical Safety Board to 9 make those recommendations and then for those 10 agencies to go through the process and determine 11 whether it's too burdensome or whether it's 12 unnecessary. So that's what I wanted to say. 13 I think that this is something that 14 definitely deserves more attention and discussion 15 by the Chemical Safety Board and the staff and 16 other stakeholders. 17 MEMBER ENGLER: Thank you very much 18 for your comments. United Memorial folks were 19 here for our June 10th stakeholders meeting which 20 we much appreciated their input. We should 21 follow up with them for some of the photos that 22 may overlap with some of the CSB investigations.

(202) 234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. 132 1 MEMBER EHRLICH: Thank you for your 2 input. 3 MEMBER ENGLER: Anyone else on the 4 phone, on the telephone? 5 OPERATOR: At this time, we have no 6 further comments. 7 MEMBER ENGLER: Okay. The last 8 speaker at this moment, I will call for any other 9 speakers after that in case someone is suddenly 10 moved to say a few words, is John Morawetz from 11 the International Chemical Workers Union. 12 MR. MORAWETZ: Firstly, I support what 13 Celeste just mentioned. I think that the CSB has 14 done an excellent job of looking for the findings 15 as to what happened in that incident, what are 16 the root cause analysis, and made 17 recommendations. Where the facts go, and the 18 recommendations lead to organizations like the 19 American Chemistry Council, the education that 20 you've just voted on. 21 Whether it means other voluntary 22 associations, whether it means regulations, we

(202) 234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. 133 1 just have to look where the facts go and follow 2 up on them. I think that's what the CSB has done 3 an admirable job on. 4 I'd like to also say that I wrote a 5 letter after the original meeting about CAPECO. 6 And I think that, in particular, the community 7 around that area deserves to have a report for 8 people to hear what happened. Further, I think 9 that it's good to see an incident that I believe 10 there any weren't any fatalities in that 11 situation. 12 But that the aim is to avoid them. 13 And I think that's exactly what the CSB is doing 14 an excellent job. Thank you for doing that as 15 well as having these public meetings. In 16 particular for the chemical workers, having the 17 opportunity for some of the family members from 18 DuPont to come to talk, to see the preliminary 19 report. 20 It's a similar vein of seeing 21 preliminary findings, being able to use them, 22 take them back to the community, it's a very

(202) 234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. 134 1 useful function. And thank you for doing the 2 regular meetings. Thank you. 3 MEMBER ENGLER: Thank you. Anyone 4 else in the audience or on the phone? 5 KERI MOSS: Hi my name is Keri Moss 6 and I'm delighted to be here on behalf of the 7 American Chemical Society. We are grateful for 8 the CSB staff recognition of our work on the 9 report Identifying and Evaluating Hazards in 10 Research Laboratories. 11 On behalf of the Chemical Safety 12 members or the ACS members who work in chemical 13 safety, we would like to say we really 14 appreciated this collaboration and this 15 opportunity to collaborate. Our members are 16 eager and available to work with the CSB, 17 collaborate with the CSB on any future projects. 18 Our chemical safety members would also 19 like to say that we have utmost respect for your 20 investigative team and the level of technical 21 competence that you demonstrate in your 22 investigations.

(202) 234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. 135 1 We hope that throughout this time of 2 transition, that CSB, that you will continue to 3 maintain the same admirable level of technical 4 standards in your reports. Thank you very much. 5 MEMBER ENGLER: Thank you very much. 6 With that, I'm going to close the public comment 7 period of the meeting. We're approaching the 8 closure of the meeting overall. 9 I want to remind people that the next 10 public business meetings of the CSB will take 11 place on October 21st, January 20th, and April 12 20th. All of those meetings will be noted 13 through the Federal Register. We'll include the 14 topics that will be discussed at the meeting in 15 the register. We'll endeavor to get advance 16 materials where we can on the CSB website. 17 I would also suggest that, starting in 18 October people not show up here because we will 19 have moved. And the new address will be 1750 20 Pennsylvania NW which is actually an adjunct of 21 the White House. 22 Because of the size of our agency and

(202) 234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. 136 1 its influence, those in the Executive Branch 2 decided that they wanted us much closer so we 3 could far better coordinate our expectations for 4 chemical safety moving forward. So it's 1750 5 Pennsylvania Avenue. 6 We also anticipate with the release of 7 reports that we will be holding meetings in the 8 communities affected by the incidents. Those 9 meetings are incredibly important to engage with 10 the local communities. 11 At the point in the future, if we 12 approve the CAPECO report of course, I think 13 there are some important outreach to be done in 14 Puerto Rico. I've already talked to Vidisha 15 about developing a potential, and I have to 16 underline potential because it's pending a re- 17 vote on that issue, plan to get out the video 18 that in fact is completed but not approved to the 19 local community. 20 And take other steps to assure that 21 those who were affected by that incident and the 22 fact that there's a continuing operation of the

(202) 234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. 137 1 facility there, will have as much information as 2 they can to prevent future incidents. 3 With that I am going to close the 4 meeting. Thank you all for attending. Thank you 5 to the staff for their very important 6 contributions to this meeting today and of 7 course, stakeholders. 8 OPERATOR: Thank you ladies and 9 gentlemen, this concludes today's conference. 10 Thank you for participating. 11 MEMBER ENGLER: No it doesn't, stop a 12 second. 13 MEMBER EHRLICH: First of all, I want 14 to thank our staff both here and from the Denver 15 office for what they've done. I know that 16 there's been some disagreement. I certainly 17 appreciate the work you've done and we'll get 18 through that. For everyone that made the time 19 and effort to come here, thank you very much. 20 Again, I want to make sure the record 21 reflects that the condolences go out to the 22 family members here and their family for the

(202) 234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. 138 1 tragedy that occurred in La Porte. So with that, 2 thank you all very much. 3 MEMBER ENGLER: And with that, the 4 meeting is closed. Thank you again for 5 attending. 6 OPERATOR: Thank you ladies and 7 gentlemen, this concludes today's conference. 8 Thank you for participating. You may now 9 disconnect. 10 (Whereupon, the above-entitled matter 11 went off the record.) 12 13 14 15 16 17 18 19 20 21 22

(202) 234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. (202) 234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. 139 A $1 75:9 115:5 a.m 3:2 88:2 abandonment 130:20 ability 70:1 110:1 able 10:22 43:11 48:10 57:17 67:21 76:5 78:7 78:18 133:21 abolishing 34:21 above-entitled 48:18 102:3 138:10 above-ground 21:10 22:12 23:5 125:22 absolutely 28:9 Academic 118:10 121:2 acceptable 39:12 43:21 44:4 103:20 104:14 110:12 118:7 accepted 82:11 86:9 access 58:3,5,8 92:18 93:2 accessible 93:8 accident 52:6 73:4,16 73:19,22 88:16 accidents 37:11,13 54:9 70:8 73:22 95:7 107:19 110:6,22 accompanied 48:13 accompanying 25:8 accountable 77:13,15 79:4 80:12 accuracy 18:2 accurate 18:4 acid 51:19 acronym 60:9 ACS 117:10,21 118:8 118:11,13 120:18 121:5,8,12 134:12 Act 6:6 81:6 Acting 1:14 3:17 action 25:16 37:12 38:9 39:13 43:21 61:7 103:20 104:14 118:7 actions 38:7 41:10 54:7 103:15 108:12,13 110:16 114:13 117:19 121:19 activities 13:19 14:4 66:11 91:14 108:18 127:20 130:16 activity 113:19 actor 34:16 actual 55:5 85:22 90:14 93:2 101:8 119:5 add 32:1 58:1 68:11 added 104:22 123:15 adding 105:2 addition 23:18 41:3 59:7,14 71:7 109:15 111:15 additional 6:22 20:2 22:19 25:18 30:14 31:6,15,18 36:2 46:15 58:2,4 94:16 105:3 111:18 114:14 Additionally 103:18 124:2 additions 116:1 address 6:9 32:14 57:10 64:12,14,17 92:6 105:7 115:18 127:10 135:19 addressed 125:3 130:19 addresses 120:2 addressing 67:1 126:17 Adel 32:12 adequate 62:13 adequately 22:13 111:1 adhere 28:6 34:17 adherence 30:11 adjunct 135:20 Administration 27:18 116:4 admirable 133:3 135:3 adopt 25:4 64:18 adopted 28:8 33:3 107:16 adoption 116:12 advance 33:21 72:3 135:15 advancing 107:4 advocacy 28:12 advocate 100:8 advocating 52:21 aerosolized 21:16 Affairs 26:11 affiliation 3:21 affirmative 122:21 afternoon 125:18 age 50:2,3,3,4 agencies 18:21 27:22 29:9 32:5 33:22 82:10 84:22 88:15 94:3 127:19 129:22 131:4 131:10 agency 9:6 10:6 27:16 28:22 32:19 33:7,17 34:6,11 36:5 100:1 135:22 agency's 33:9 34:9 126:5,13 agenda 2:18 7:4,8 8:4 21:1 36:8,8,11 47:6 49:19 91:1 102:10 125:2 ago 52:5 112:12 113:22 agree 26:16 agreement 10:9 ahead 11:16 46:3 48:1 89:17 97:9 128:14 aid 118:3 aim 133:12 air 57:2 61:13,19,22 74:15 AL 103:6 Alan 83:3 alarm 22:10 59:4 62:14 alarms 29:8 59:8,19 alleged 40:19 41:1 alleges 81:10 allow 64:22 89:6 allowed 15:1 29:19 30:9 70:3 109:12 alter 7:13 alterations 34:2 alternate 103:14 104:14 alternative 103:20 American 2:15 4:8,15 31:11 42:18 103:20 116:20 117:1 118:18 122:9 128:4 132:19 134:7 ammonium 16:15,16 35:6 amount 72:11 amounts 86:4 Amy 5:20 48:3,12 Anacortes 113:21 analyses 60:2 105:4 analysis 12:9 14:6 15:3 19:15 41:8 60:1,7,10 60:22 69:22 94:5,15 105:3 109:14,18 119:16,21,21 120:5,9 120:21 132:16 analyzed 15:11 analyzer 62:11 analyzers 14:12 and/or 31:21 animation 68:13,16,21 Anna 5:16 announced 6:7 annual 40:1,4 annually 123:20 anonymous 82:9 anonymously 40:11 answer 3:8 97:20 anticipate 17:2 67:18 136:6 anybody 84:18 anymore 24:18 75:2 API 4:7 31:11 Apologies 11:16 apologize 8:8 72:3 112:11 124:3 apparently 76:19 appear 129:8 appeared 49:22 appears 88:19 89:1 93:9 applicable 22:12 applications 119:18 applied 9:14 55:6 61:2 72:15 apply 31:14 55:7 61:9 106:10 108:12 119:9 applying 55:13 appointed 130:9 appreciate 8:20,22 11:22 65:5 77:1 88:19 92:21 105:14 137:17 appreciated 131:20 134:14 appreciates 111:6 approach 32:4 33:7 61:10 approached 62:19 approaches 32:6 approaching 135:7 appropriate 17:21 18:1 25:1 31:10 37:12 67:5 120:13 131:5 approval 67:9 approve 64:19 89:7 136:12 approved 136:18 approximately 22:4 88:2 125:8 April 16:14 44:6 135:11 area 12:18 18:12 21:17 21:19 30:10 35:8 40:17,18 55:17 57:19 59:13 61:20 73:5 133:7 areas 66:12 arena 92:16 arenas 113:12 argument 34:12,20 arises 99:21 arising 81:6 Ashlee 46:2,3,5 aside 81:18 asks 23:13 aspects 121:7 ASPM 4:14 assess 15:12 40:21 117:16 127:19 assessing 117:11 assessment 22:21 assessments 23:6 assist 14:6 31:5

(202) 234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. 140 Association 4:2 31:11 125:21 associations 42:18 132:22 assume 7:3 assurance 30:16 101:10 assure 40:7 101:15 136:20 ATF 4:17,18 125:13,16 atmosphere 57:4,18 63:1 atmospheres 13:13 58:12 attempting 68:8 attendance 8:22 attending 137:4 138:5 attention 26:18 131:14 attorney 81:4 attorneys 92:8 attributes 108:19 audience 98:16 134:4 audio 1:20 46:5 82:6,11 85:22 98:18 audit 37:14 70:10 audits 110:22 August 61:11 62:2 64:11 100:12 104:5 authority 100:2 126:21 130:2 automatic 23:14 automatically 14:21 available 11:12 42:10 67:2 82:3,13 86:14 106:20 111:17 134:16 Avenue 136:5 avoid 81:11 133:12 aware 73:9 90:6 91:21 94:14 98:12 Aye 47:18,20 124:19,21 B B 38:7 B12 39:4 B13 39:4 baby 74:12 95:5 back 9:4 17:2 19:16 25:12 40:16 43:17 46:6 61:8 74:18 77:19 85:18 88:22 96:7 97:8 110:19 133:22 background 10:12 90:16 backgrounds 114:22 bad 34:16 37:9 Baker 50:4 78:6 banding 119:20 Banks 1:13 2:5 16:7,10 20:3 35:5 bargaining 43:15 barrier 58:19 Barton 46:2 base 34:1 based 27:11 29:16 34:9 37:21,21 38:8 107:15 113:7 123:15 basic 51:6 basically 24:20 43:16 116:5 123:14 124:8 basis 41:21 42:2 Baton 49:8 81:4 Bayamon 21:8 Beaumont 49:4,6 beg 74:22 77:18 began 52:5 begging 77:14 beginning 11:20 82:17 behalf 8:15 50:12 89:20 92:8 101:4 134:6,11 behest 29:15 believe 11:4 27:19 28:7 52:14 54:8 68:9 95:13 96:12 121:10 133:9 believed 73:1 believes 84:4 110:20 111:4 Belle 52:1 beneficial 31:14 92:17 benefit 26:14 42:9 56:16 94:7,14 benefits 32:2 57:9 116:7,13 best 23:4 31:5 70:1 97:4 better 9:4 62:8 75:12,22 78:7 93:2 136:3 beyond 86:22 87:1 121:11 Bhopal 54:18 55:14 big 76:6,7 85:10,12 115:15 130:7 billion 115:5 bit 48:1 104:1 119:7 blast 12:17 blasts 42:10 blended 13:5 blunt 96:21 Board 1:1,7,9,10,21 3:10,14,16 4:4 6:3,3,6 8:16 9:3 10:4,7 11:12 11:21 16:10 17:14 18:22 19:19,21 20:17 21:5 25:4 35:13,21 36:2,19 39:5,8 43:21 44:1,1,4,5,9,14 45:5 46:18 50:12 51:5 64:18,22 67:2,3,9 68:1,2 70:11,13 79:20 82:3,13,15 86:14,18 86:20 88:15 95:9 102:18,18,22 103:14 104:4,15 107:16 113:6 117:10 118:6 118:22 121:3 123:4 126:4,9 127:12 128:13,22 129:9,13 129:19 131:1,7,8,15 Board's 25:6 51:10 52:10 70:16 129:2 book 29:12 Books 4:6 bottom 55:3 bounce 97:22 boy 74:12 boys 72:16 79:16,17 BP 2:7,9 36:12,17,19 37:2,9,10,15,16,19 38:16,17 39:1,3,16,20 40:2,5,8,9,9,12,17,22 41:3,14,18 42:4,16 43:3,7,13 44:3,19 46:11,12,17,17 53:1 90:9,18 BP's 37:19 branch 107:9 130:7 136:1 break 48:3,8,16,22 101:22 breath 74:15 Brent 89:15,18 91:10 91:17 92:5 brief 16:12 48:21 53:16 briefing 10:21 briefings 93:1 briefly 37:7 48:19 49:18 90:5,16,21 99:4 102:4 106:22 129:11 bright 74:11 brilliance 123:9 bring 35:20 36:3 broad 71:2 broader 69:14 broadly 55:14 71:11 broke 78:10 broken 60:10,18 brother 72:16 73:1 74:10,16 brother's 75:8 brother-in-law 87:16 brothers 72:6,9,13 74:2 74:6 76:16 77:6,17,18 77:19,21 brought 24:16 72:17 budget 115:5 building 11:1 53:8,9 54:21 55:13,16,19,21 56:1,4,5,10,12,20,21 57:1,3,7,10,18 58:5,7 58:9,13,16 61:13,21 62:4,15,17,20 67:16 76:19 building's 57:6 63:20 buildings 56:8,15 62:12 bulk 23:5 Bullet 39:15 bulletins 42:13 bully 100:6 Buncefield 9:16 26:20 bunch 84:2 burdensome 27:20 131:3,11 burned 21:21 Burnside 81:8 82:7 83:4 86:5,15 business 1:3 2:17 3:3 8:21 9:5 17:7 37:20 47:11 65:22 66:3 115:11 116:4,5 122:13 123:1,2,5,17 123:20 124:9,16 135:10 buyers 4:13 bypass 88:20 C C 38:11 C-O-N-T-E-N-T-S 2:1 Cal/OSHA's 107:4 calculations 81:22 calendar 24:15,20 122:17 calendared 24:13 25:1 44:5,13 calendaring 47:3 California 2:13 12:4,14 15:8 102:13 104:6,11 105:11,16 106:1,3,11 106:12,18 107:7,11 107:17 111:21 112:5 112:7,17,19 113:5,10 113:13,14,16 114:6 114:12 call 3:5,9 28:5 40:10 46:6 47:15 66:18 78:16 83:7 84:8,9 121:5 124:14 126:19 132:8 called 12:15 41:14 83:3 84:12 98:11 129:5 calling 6:17 83:17 84:22 129:15,21 calls 120:17

(202) 234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. 141 cameras 86:15 cancelled 124:10 capabilities 94:19 capacity 21:9 CAPECO 23:2,12 26:6 26:13,19 28:1 29:3,15 29:21 30:16 31:13 32:15 126:6,11,14 129:13 133:5 136:12 carbide 103:8 care 95:15 carefully 99:16 cares 89:2 Caribbean 2:6 9:7 21:2 21:8 24:5 25:7 Carla 4:11 carried 13:18 case 7:12 16:14 18:5 82:5,12 86:2,3,10 101:14 120:15 126:14 132:9 cases 35:3 92:14 casualties 74:3 casualty 72:8 76:5 catalyst 12:17,20 13:8 14:3 catalytic 12:12 catastrophes 22:16 catastrophic 9:15 22:10,13 23:12 109:11 110:3,6,11,12 caught 96:22 causal 69:21 cause 30:12 41:8 94:5 132:16 caused 22:3,5 27:7,9 51:12 104:6 130:11 causes 26:13 41:9 65:8 70:1 127:10 causing 13:2 CE 121:4 Celeste 128:12,15,16 128:18 132:13 cell 6:17 125:14 central 108:17 centric 124:3 CEO 75:17,18 certain 11:6 certainly 10:13 97:5 99:11 110:17 113:10 137:16 certification 40:2,5 certified 82:15 cetera 20:4 24:22 26:1 chain 13:3 Chair 10:5 97:21 123:8 chairs 119:13 challenged 86:11 challenges 97:1 116:13 challenging 10:3 chance 125:14 chances 34:7 change 7:13 97:18 102:19 110:13 114:3 120:4 123:3 124:10 124:16 changed 39:7 66:8 96:12 112:22 113:3 changes 2:17 80:10 87:12 88:6,8 89:6 101:8 105:6 106:5,10 109:19 111:11,14 113:1 120:9,13 charged 130:11 Charleston 18:11,16 check 95:10 checklist 98:9 checklists 119:21 chemical 1:1,7,8,9,21 2:15 4:4 5:5 10:12 21:5 28:20 29:1 50:15 56:7 59:18 69:4 75:13 79:12,19,22 88:14 109:11 116:20 117:2 118:12,18,18 119:19 122:10 129:2,19 131:6,8,15 132:11 133:16 134:7,11,12 134:18 136:4 chemicals 55:2,9 58:18 72:21 126:1 Chemistry 4:16 132:19 Cheryl 1:15 2:5 12:5 19:6 Chevron 15:7 103:5,9 104:2,4 105:20 114:11 Chief 40:6 chlorine 55:10 choices 56:6 choose 66:12 chosen 46:13 Chris 3:4 102:7 citations 99:17 city 36:17,22 37:10,15 53:1 90:4,18 103:12 104:9,17 105:5 civil 92:10,16 claimants 92:8 claimed 52:7 claims 81:6 88:3 clarification 89:20 93:12 clarify 51:11 91:8,21 100:1 Class 22:14 28:15 classified 57:12 Clay 49:3,3 clear 107:21 108:12 109:2 122:12 cleared 59:13 clearly 33:5 49:22 55:5 86:8 126:13 clients 51:4 90:17,20 clinical 119:12 close 101:14 120:17 135:6 137:3 closed 39:12 42:1 44:4 103:19 121:18 138:4 closely 91:6 closer 136:2 closing 2:20 101:13 closure 38:9 41:17 43:6 135:8 cloud 9:18 21:16,20 26:22 83:4 cluster 85:12 coal 130:7,8 coast 29:11 124:2 Cobran 4:21 COBREN 4:21 code 39:17 codes 63:8 64:2 collaborate 134:15,17 collaboration 134:14 colleague 3:16 collection 14:3 88:5 combustible 23:22 35:8 come 47:4 48:10 68:19 71:19 73:11 77:19 84:21 85:20 97:8 133:18 137:19 comfortable 72:1 coming 8:11 77:1 83:18 95:10 115:11 116:18 command 40:6 commenced 81:12 commend 26:11 commended 26:10 commending 122:9 commends 105:5 comment 2:9,12,18 6:16,19 7:16,18 17:8 17:14 25:15 45:12,14 45:14,21 46:1,18,22 68:1 69:11 71:15,15 73:11 85:15 89:12,14 90:21 91:8,18 98:22 106:14,17 116:18 122:22 125:3,11 127:11,21 128:9,12 128:13 135:6 commentary 90:7 commented 115:14 commenting 123:12 comments 6:21 7:1,20 9:10 17:2,4 19:16 20:19 25:19,22 30:3 30:19 36:7 45:5 46:7 46:14 47:8 53:16 66:5 71:20 87:4 91:22,22 92:3 95:2 97:7 98:15 98:18,21 101:13 106:20 111:16 116:16 116:16 117:3 125:5,6 125:10 126:7 128:3 128:11,21 131:18 132:6 Commission 115:5 commitment 36:3 committed 92:19 Committee 118:11,18 commonly 13:13 communicated 39:21 54:4,7 64:7 121:12 communication 38:11 113:2 communications 38:22 communiques 93:17 communities 22:22 35:15 104:7 107:6 136:8,10 community 12:19 14:4 21:22 26:15 31:6,17 43:13 56:16,18 57:9 75:11 79:8 80:15 133:6,22 136:19 companies 4:12 9:19 30:22 52:22 56:4,5 60:11,15 company 30:4 31:8 44:22 84:16 company's 41:19 competence 134:21 complaint 83:6,9 complaints 83:17 110:9 complete 17:13 68:21 69:20,22 completed 9:13 42:11 64:4 118:13 136:18 completing 20:5 completion 20:5 complex 32:1 complexity 23:8 68:14 compliance 32:8 64:1 110:18 126:16 127:5 127:15,20 comply 30:4 complying 28:2 127:2 comprehensive 63:18 117:8 121:22 concealment 86:16

(202) 234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. 142 concentration 62:13 concern 108:5,21 concerned 52:16 87:17 101:6 109:3 111:9 concerning 20:11 21:3 24:11 31:7,19 45:7 concerns 15:15 40:11 54:3,5 64:12 108:3 125:4 conclude 43:20 51:7 concluded 53:18,20 126:12 concludes 16:4 122:1 137:9 138:7 conclusion 34:14 36:21 101:19 121:3 conclusions 111:5 126:8 concur 93:19 94:10 conditions 62:16 condolences 8:17 50:13 137:21 conduct 3:7 18:16 22:20 23:6 39:17 40:3 62:2 63:17,19 conducted 37:14 60:22 61:20 120:3 conducting 41:7 115:22 conference 3:8 96:13 96:14,15 129:8 137:9 138:7 conferences 42:21,22 confidential 17:7 65:22 66:3 confirm 36:2 confirmed 10:5 conflicting 31:19 confront 96:3 confusing 62:6 confusion 32:1 51:13 connecting 60:3 consensus 22:18 31:12 consequence 92:16 consequences 26:22 consider 33:16 56:5 60:2 consideration 11:11 32:22 35:22 51:10 127:22 considered 32:21 33:13 56:22 60:8 107:12 considering 22:21 23:6 34:7 considers 61:3 consistent 93:21 119:3 120:15 constitutes 6:5 construction 93:15 construed 32:10 consult 37:4 consultant 128:20 consultation 33:21 Consulting 5:9 contact 18:21 contain 84:3 contained 18:9 56:11 65:22 105:22 containing 58:17 containment 21:17 30:5 56:5,8,9,15,22 continue 135:2 continued 15:11 29:21 continues 120:6 continuing 17:10 82:18 87:20 94:2 136:22 continuous 30:22 120:19 Contra 103:11 104:10 104:17 105:6 113:13 contract 97:13 contractors 14:5 98:4,7 contrary 32:3 contribute 20:21 24:2 contributed 19:14 contributions 137:6 control 13:6,14 14:12 23:16 29:17 30:1,20 109:14 117:16 119:16 119:20 122:1 controlled 56:3 110:2 controlling 117:11 convened 42:22 conversation 111:19 converts 13:3 convey 62:10 Coon 89:15,18 91:10,17 92:5 cooperation 105:17 cooperatively 10:7 coordinate 136:3 copy 7:4 82:2,12 core 7:2 20:21 36:5 corner 6:12 corners 75:21 77:8 corporate 36:19 37:14 37:16 70:3,6,10 correct 35:5 80:20 100:13 115:21 correction 37:12 corrections 80:15 corrective 38:7 108:13 cost 32:1 94:14 116:7 Costa 103:11 104:10,17 105:6 113:13 Council 4:16 132:19 counsel 1:14 3:17 17:7 89:22,22 90:4 93:1,8 counted 129:19 Countermeasures 30:21 counting 108:15 countries 126:4 country 35:16 112:20 County 103:11 104:10 104:18 113:13 couple 48:15 65:17 101:21 129:17 course 6:22 20:20 25:18 33:17 73:21 83:16 125:5 136:12 137:7 court 81:19 82:15 cover 51:3 54:11,13 63:3 96:2 cracker 12:12 create 60:9 117:22 121:13 created 119:3 creates 56:20 Creating 118:9 121:1 credit 61:1 129:4 Crimaudo 4:7,7 128:3 critical 20:22 57:12 110:21 112:10 critically 33:11 criticism 32:10 90:22 91:11 crop 51:16 63:12 Crystal 50:2 CSB 2:4 3:3,13 4:10 5:20 7:3 8:20 10:2 11:19 13:16 14:13 15:4,6 19:12 22:7 23:3,13,18,22 26:11 28:8 32:18 33:10 36:17 37:1,7,22 38:22 39:15 44:20 47:11 51:21 52:3,5,15,16,21 67:3 71:7 90:2 91:1 91:12,14 92:14,20 93:6,14 94:2,17,20 95:9 97:3 99:7,22 100:18 104:8 105:5,7 105:21 106:4,16 107:1,6,14 108:3,15 109:3 110:20 111:4,6 111:9,13,18 114:10 114:18 117:7,19,20 124:6 125:7 127:8 130:1 131:22 132:13 133:2,13 134:8,16,17 135:2,10,16 CSB's 3:17 50:5 51:1,3 64:21 103:16 120:15 culture 37:3 118:3,4,11 Cultures 118:9 121:2 current 6:3 22:11 28:21 29:16 30:12,19 64:7 86:12,22 108:9 111:10 120:5 currently 10:3 15:20 16:4,22 20:6 67:13 70:20 71:2 102:17,18 102:22 104:14 107:9 108:2 115:22 122:14 122:19 128:10 cut 75:21 77:8 D D.C 123:20 damage 15:18 16:20 damaged 13:1 22:2,3 Dan 1:15 2:11 4:18 8:1 12:8 48:3,8 49:15 50:5,22 65:11 67:20 69:10 71:4 76:22 97:22 125:16 dandy 76:13 danged 76:4 danger 29:5 66:19 dangerous 72:21 dangers 9:17 Darrow 81:7 82:7 86:5 date 7:13 18:19 20:5 31:10 90:13 93:21 100:11,12 106:17 dated 106:19 daughter's 75:14 daughter-in-law's 96:9 David 4:17 125:12,13 day 10:11,11 45:2 51:22 59:16 97:2 days 21:21 59:16 115:18 deadline 25:15 deal 76:6,7 99:13 104:20 116:13 dealt 41:22 deaths 75:6 88:12 debate 24:21 33:1 Debris 13:1 Debs-Jones 5:12 December 117:21 118:12 decided 118:20 121:4 136:2 deciders 68:2 decision 51:6 52:10 declare 22:6 decreased 57:9 deep 80:4

(202) 234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. 143 deeply 35:1,16 99:5 101:5 Deer 73:6 75:14 defer 116:16 deficiencies 24:1 109:16 defined 33:5 definitely 80:3 131:14 DeLaune 49:7,7 80:19 80:21 81:2,3 delay 67:16 deliberate 74:1 deliberation 81:14 delighted 134:6 demonstrate 26:21 134:21 demonstrated 127:1 Denny 5:6 Denver 8:2 65:6 137:14 deny 89:4 department 29:10 43:10,11 46:10 83:2,7 106:12,18 departure 9:2 dependent 71:1 depict 86:11 depicts 86:4 deploy 52:10 deployed 13:17 deployment 51:5 53:17 53:21 DEQ 83:11 dereliction 34:10 130:20 describe 68:18 76:17 described 111:15 describes 117:16 119:14 describing 26:13 deserve 76:10 deserved 78:6 deserves 26:18 131:14 133:7 design 31:2 54:18,20 54:21 55:5,6,8,14,20 57:6 59:1 63:18,21 designated 89:22 118:7 designed 13:12 41:15 58:10,13 63:6 despite 15:16 57:22 destroyed 22:4 destruction 55:1 56:13 detail 54:15 detailed 10:21 63:15 64:4 details 37:4 63:9 detector 59:4,7,19 detectors 58:22 59:1,2 59:11 62:22 determinations 131:7 determine 23:4 39:6 65:21 120:6 131:10 determined 14:13 determining 41:9 detonation 16:15 devastated 72:10 develop 53:21 64:3 69:18 117:10,14 121:5 developed 39:16 40:9 41:13 42:4 118:16 developing 41:7 136:15 development 69:14 111:7 119:22 device 13:6 56:13 devices 90:10 dialogue 100:20 111:20 die 76:10 died 11:1 49:22 74:5 77:6 different 32:13 52:13 60:19 75:5 108:15 119:15 differing 32:13 difficult 10:8 68:17 123:13 difficulties 96:22 difficulty 28:7 dike 21:18 30:6 diligently 19:8 20:16 30:17 88:16 dilutes 28:10 dilution 61:13 DIR 106:19 107:4 111:13 direct 30:12 directed 27:15 32:4 130:15 direction 101:7 directive 110:18 directly 54:22 57:4 Director 1:13 8:7 Directors 36:19 46:18 disagreement 27:12 137:16 disappear 47:5 disappeared 78:13,13 disappointed 83:19 91:2,10 disaster 130:6 disasters 130:12 discharged 57:4 disconnect 138:9 discover 65:7 discovered 81:15 discuss 16:8 35:14 54:17 129:1 discussed 7:17 44:7,14 83:22 135:14 discusses 119:17 discussible 103:14 discussing 12:2 51:15 53:22 120:17 discussion 21:1 24:14 24:16,21 25:2 44:17 47:17 51:8 68:9 101:15 131:14 discussions 93:6 dismissal 54:7 disposable 78:2,3 disregard 87:22 disrepair 29:20 disseminated 93:11 disseminating 37:18 dissemination 42:3 93:16 distribution 61:19 disturbed 35:17 disturbing 35:1 86:4 division 109:12,15,16 divorce 74:17 Dobbin 5:6,6 doctors 95:10 document 54:14 55:5 62:8 63:10 65:13,14 65:18 67:17,20,21 69:18 106:7 118:3,21 119:1,5,7,8,14,17 120:2,16,22 121:15 documentation 43:3 93:2 109:5 115:17 documented 41:5 55:20 documenting 29:15 documents 14:1 65:11 118:1 119:2 122:16 doing 28:10 72:1 74:20 75:7 79:6 84:2,6,18 84:19 85:2,3 97:17 112:5 122:12 133:13 133:14 134:1 Don 1:13 2:4,14 8:6 11:20 65:12 67:12 69:11 90:5 102:12 door 62:14,20 doors 57:1 58:15 doorways 63:1 doubt 85:5 94:7 Douglass 5:13 draft 9:6,8,20 11:10 17:10 25:22 27:13 28:16 29:14 30:15,19 33:21 51:9 63:11 64:10 70:20 106:6 107:2 108:1,8,9,16 111:7,10,19 112:17 118:3,14 126:12,19 127:4 drafted 19:11 drafting 18:15 drafts 20:18 57:3 106:7 106:13 Draney 5:14,14 dreadful 88:1 drive 127:5 Dudzig 5:12,12 due 15:18 88:10 92:14 dug 80:4 Dugas 49:3,3 duly 6:7 Dunham 46:2 duplicative 31:19 DuPont 2:10,12 5:2 8:1 10:15 12:10 48:9 49:21 51:2,9 52:1,4,6 54:4,6,19 55:7 56:2 57:7,13 58:1,10 60:10 60:17,21 61:1,8,16 62:1 63:5,12 64:4,7,9 64:16 65:21 66:4,10 67:14 68:15 70:14,21 72:9 75:3,18 77:7 78:1,20 79:21 81:6,10 81:13,15,19,19 85:4 85:20 86:17,20 88:3,4 88:12,20 89:1 90:17 91:16 92:1,6 93:5 97:13 98:3,10,20 99:10,18 100:9,17 101:2,11,15 133:18 DuPont's 52:17,18 54:20 55:4 58:21 59:12,22 62:11 65:1 76:11 81:7 87:22 89:4 DuPonter 79:15 dust 12:20 13:8,14 duty 32:21 34:10 130:20,21 dying 77:11 E E 112:15 eager 134:16 earlier 10:15 71:19 94:11 109:13 126:9 early 17:16 19:1 90:22 91:11 113:4 Eastern 124:11,17 eco-report 19:3 editing 14:9 editor 19:17,20 edits 19:18

(202) 234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. 144 educating 31:16 education 125:19 132:19 effect 120:10 effective 24:19 28:18 31:17 45:2 58:18 59:1 61:19 109:1 110:10 111:11 effectively 37:11 55:7 55:13 56:3 58:11 59:3 64:22 127:9 effectiveness 15:12 127:19 effort 50:14 61:6 65:5 111:6 137:19 efforts 8:20 43:8 46:15 86:9 104:16 112:6 115:10 Ehrlich 1:9 2:3,17,21 3:16 8:10 11:16,17,22 20:10,13 24:13 26:5 32:17 36:7 47:13,17 47:18 65:9,10,20 66:6 66:17 67:7 69:1,10 87:6 98:22 99:1 101:5 112:2,3,12 114:3,5 115:9 116:2 122:4,5 124:13,18,19 126:9 128:5 129:13 131:1 132:1 137:13 Ehrlich's 126:22 eight 52:5 81:13 eldest 95:6 electronic 29:17 electrostatic 12:16 14:16 elements 23:19 37:7 eliminated 109:22 email 42:10 emergency 6:10 13:21 16:18 22:6 59:12 emission 9:18 emotional 72:3 emphasize 110:4 emphasizes 120:16,18 employed 53:14 employee 5:2 employees 38:13 39:19 42:9 43:7 49:22 53:5 53:9 82:9 97:12,14 98:3,4 employer 109:17 110:2 empowerment 15:15 enable 86:21 enabling 33:15 enclose 56:7 enclosed 53:8 55:12,16 55:18 56:1 58:14 enclosing 56:20 encompass 28:14 encourage 19:4 32:5 encouraged 37:10 100:9 107:3 125:5 encourages 38:5 127:7 endeavor 135:15 ended 29:4 enforcement 28:19 94:18,21 enforcing 31:15 engage 136:9 engaged 81:19 92:22 engaging 71:3 engineer 66:12 engineering 22:22 23:17 31:3,8 61:15 63:20 engineers 114:18 115:7 Engler 1:8 2:3,17,21 3:10,10,12,14 6:2 10:7,10 11:15,18 16:6 16:11 19:5 20:9,15 25:12 32:16 36:15 44:10 45:3 46:8 47:19 47:20,22 48:6,20 49:17 50:20 65:4 68:3 69:9 70:11 71:13,21 79:10 80:18,22 87:3 89:10 91:7,15,20 95:1 96:5,10 97:19 98:14 98:19 99:3 102:5,10 112:1,4,13,14,16 114:1,4 116:15 122:3 122:7 124:20,21 125:1 128:2,6,17,22 129:9 131:17 132:3,7 134:3 135:5 137:11 138:3 enhance 114:7 ensure 14:19 17:20 23:14 31:2,4 38:2,17 40:3 41:21 63:6 64:1 87:12 88:17 105:8 110:1 111:1 ensuring 100:20 120:12 enter 62:17 63:2 entering 58:19 entire 126:21 entirety 38:1 entities 33:12 entitled 106:7 118:9,14 entity 83:10 115:6 entrance 6:11 entry 58:11 environment 46:10 73:2,21 environmental 5:7 27:16 29:10 42:20 environments 23:7 envy 76:14 EPA 23:3,13 28:13 29:9 29:16 30:2,3,12,13,18 31:5,14,20 33:11 60:12 81:11 94:20 115:16 129:15 EPA's 126:20 equipment 12:15 14:7 14:10 15:17,18 54:22 55:21,22 56:8 57:12 58:4,9,17 86:7 equipped 62:12 equivalent 114:22 escape 58:10,11 ESP 12:16 13:1,6,12 14:20,21 especially 95:8 ESPs 13:13 essentially 60:19 65:18 68:13 69:13 99:14 establish 33:10 established 109:1 establishing 41:9 118:4 et 20:4 24:22 26:1 evacuate 21:22 evacuation 12:22 evaluate 39:6 64:22 121:22 evaluated 58:11 61:14 63:6 120:5 evaluates 86:19 Evaluating 118:15 134:9 evaluation 39:9 61:13 61:18 63:20 117:8 118:17 evening 95:20 event 6:10 29:6 events 60:2 everybody 84:20 everyone's 8:22 evidence 82:5,12 86:2 86:3,10 evidenced 121:7 evident 80:3 exactly 83:8 133:13 examine 70:19 examining 40:22 example 46:21,22 104:22 109:20 115:4 examples 43:2 120:8 exceeding 122:10 exceeds 121:18 excellent 26:7 29:14 32:11 94:5 132:14 133:14 excerpt 55:4 82:17,21 excuse 13:8 44:11 executive 32:5 40:6 107:9,13 115:12 136:1 executives 38:3,18 exist 70:4 117:9 existence 31:2 97:3 existing 23:6 28:2,4 29:12 30:2,4 31:15 34:21 127:2,15 exists 121:21 exit 6:10 expand 28:13,17 expansion 126:20 expect 64:13 110:13 expectations 136:3 expedited 64:3 experience 10:13 115:1 130:5 experiences 32:13 expert 17:1 experts 17:4 explain 77:3 explaining 77:2 exploding 13:1 explored 112:8 explosion 9:7,16 12:12 12:14,21 14:14 21:20 22:1 27:7 36:17 37:15 117:5 130:8 explosions 27:1 Explosives 5:11 exposing 12:19 expressed 107:3 126:9 extend 8:16 43:14 extended 25:15 65:17 extension 93:18 extensive 25:13 27:14 29:8 116:9 extent 93:13 105:1 108:7 extremely 29:5,13 121:9 129:12 Exxon 90:18 ExxonMobil 2:4 12:3,13 14:18 16:5 70:12,21 eye 13:21 F facilities 22:19 23:5 28:1 38:11 43:15 46:17 52:14 71:6 101:2,11 125:22 facility 11:8 16:16 22:2 29:13,22 49:21 52:1,4 53:12 75:22 81:8 82:7 86:5,15 99:14 100:3,3

(202) 234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. 145 100:11 101:1 126:14 137:1 facing 10:2 fact 29:15 52:12 67:14 67:15 71:4 99:18 127:4,6 136:18,22 factor 53:8 Factoring 52:11 factors 19:13 51:4 52:9 94:15 120:10 130:11 facts 18:4 51:7 53:3 132:17 133:1 factual 18:2 26:8 66:4 factually 66:7 failed 14:22 26:3 36:10 86:9 failure 15:11,13,17,18 18:8 failures 15:2 94:12 fairly 54:13 67:21 fall 28:2 29:19 False 81:6 familiar 90:9 115:9 116:3 families 8:12,17 48:5 87:18,19,19 family 48:13 50:7 72:10 74:13 76:7 77:2 96:19 101:15,19 133:17 137:22,22 fan 57:3,13,19 fans 57:11,15,16 58:5 far 14:1 28:2 61:3 65:6 69:19 71:16 100:18 107:18 136:3 Farley 6:1,1 fast 30:22 fatal 88:10 fatalities 16:17 53:10 129:6 133:10 fatality 27:9 52:2,3,13 129:1 father 50:9 87:8 favor 81:18 93:15 FCC 12:13,17 13:3,9,10 14:11,15 fear 38:6 feasible 105:1 108:8 feature 96:18 108:17 February 12:11 82:8 federal 6:7 28:8 81:6,17 99:17 107:12 129:22 135:13 feed 60:4 feedback 33:22 feel 72:5 feet 35:7 fellow 115:13 felt 43:7 FEMALE 25:10 fence 99:15 Fendley 5:16,16 Fertilizer 2:5 16:8 figured 123:9 final 12:6 19:10 25:5 26:1 35:19 36:19 67:9 69:14 91:2 125:1 finalized 21:6 111:10 119:1 121:9 127:7 finalizing 111:14 finally 39:3 42:3 52:4 financially 73:12 75:21 find 4:13 34:1 35:1 43:13 66:6 83:7 88:16 finding 41:10 69:6 findings 11:5,10 12:9 23:2 24:1 26:8 37:22 41:12 51:15 66:16 93:20 100:15 126:12 126:13 132:14 133:21 finds 107:14 fine 13:8 76:13 fines 81:12 finish 69:21 finished 53:19 Fiorucci 5:8,8,8 fire 31:10 58:10 83:2,7 103:22 fires 13:3 21:21 22:2 firm 46:2 81:1,5 89:19 90:2 91:4 first 6:9 7:16 8:4,6 9:1 32:18 45:13,19 52:14 54:17 57:11 65:10 71:16 88:4,5 90:21 91:20 98:2 102:16 107:16 108:5 118:8 120:22 128:21 137:13 firstborn 95:6 Firstly 132:12 fiscal 17:15,16 19:1 five 21:9 60:13,15,16,20 119:15,18 125:11 five-year-old 77:3 fix 75:7 76:18 77:13 96:1 flammable 13:13 14:14 22:15 23:21 28:15 31:21 35:8 flammables 14:19,20 Flanagan 5:10,10 flawed 34:14 flawless 127:1 Flint 91:13 floor 6:15 45:4 71:14 125:10 flow 61:18 fluidized 12:12 focus 51:19 52:22 54:10 70:5 110:5 119:4 focused 7:16 51:16 92:1 focuses 7:2 110:8 focusing 25:16 folks 20:11 45:10 48:21 68:13 83:13 84:5 124:2 131:18 follow 18:17 22:22 23:17 34:22 41:15 43:11 82:16 114:7 131:21 133:1 followed 28:4 40:2,8 following 19:21 25:3 37:22 54:18 55:14 60:21 81:13,14 99:4 100:4 101:17 121:12 123:6 follows 63:13 106:22 108:4 footage 86:4,9,14 Forbes 75:17 force 15:14 118:2,11,17 forced 21:22 forget 96:14 form 35:19 formal 64:21 115:17 formalized 43:19 formally 64:18 former 9:3 86:11 forming 21:16 Fortunately 27:6 forward 9:10 11:13 15:9 20:17,19 32:22 33:8 44:21 46:11 69:12 84:21 92:16 94:1,3 105:8 111:20 117:3 136:4 fostering 127:14 found 22:7 32:15 37:1 60:1 63:4 81:19 91:14 93:22 95:11 100:18 117:8 four 10:19 12:20 49:21 52:7,10 53:4,9,10 64:2 71:5 80:7 87:14 87:22 103:6 123:19 frank 97:19 frankly 33:9 34:10 94:6 94:19 96:21 101:1 116:11 Freedom 16:8,13 18:6 fresh 74:15 Friday 19:20,22 83:1 friend's 73:10 friendly 121:16 front 6:10 fuel 21:10 full 16:1 17:10 19:1 62:7 63:14 69:21 70:17,19 117:13 fully 105:9 function 134:1 functioning 30:1 fundamental 27:11 33:6 fundamentally 32:18 34:14 funnest 124:6 further 8:18 23:11 32:22 35:21 37:4 46:7 47:9 51:12 68:9 86:16 90:12 98:22 105:17 109:17 111:20 116:1 121:12 127:22 132:6 133:8 future 2:17 7:14 22:16 24:5 35:2 50:15 54:8 88:13 120:21 124:11 124:17 134:17 136:11 137:2 G gallon 21:9 gaps 70:9 130:3 gas 13:4 58:12,21,22 60:5 81:7,22 83:4,14 86:5,12 gases 58:19 gasoline 9:17,22 13:5 21:15 26:17,22 27:2,3 27:9 28:16 29:18 30:9 30:14 gathering 6:5,12 gauging 23:9,9 general 1:14 3:17 15:13 56:9 66:9 106:5 generally 91:18 118:21 generate 13:11 generated 16:3 90:15 generating 14:9 generation 79:14 gentleman 81:3 gentlemen 89:19 90:16 137:9 138:7 genuine 74:8 George 5:18 getting 17:2 19:19 28:7 67:8 124:5 Gib 72:18 Gibby 72:17 74:18 78:9 Gibby's 72:16

(202) 234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. 146 Gilbert 49:13,13 50:3,8 50:10 72:7 87:7,8,15 95:2,4 96:8 Gilbert's 50:9,11 give 6:20 7:10 11:19 53:11 72:6 78:1,5 94:6 95:4 129:4 given 6:3 28:7 47:8 67:13 71:4 Glenn 5:18 go 3:19 33:1 46:3 48:4 51:12 67:22 74:1,4 75:1,2 84:5 87:19,20 89:17 95:19,22 96:3 97:9 107:18 128:14 131:10 132:17 133:1 137:21 go-to 74:16 goal 108:19,22 goals 108:16 109:1 goes 65:12 75:11 121:10 going 8:13 15:22 19:21 54:13 61:9 63:3 64:8 69:15 70:17,18 71:8 72:12 74:17 77:9 90:15 91:3,18 102:7 102:16 104:1 105:10 112:9 115:17 119:4 135:6 137:3 good 3:12 8:10 16:11 22:22 23:17 31:3,7 52:19 62:18 66:10,20 68:20 72:2 79:13,16 81:2 85:6 89:18 117:15 121:6 125:18 133:9 Google 67:3 75:17 Googled 75:3 gotten 77:7,16 83:10 95:6 96:21 governance 10:3 government 106:21 Governor 103:10 130:10 graduate 117:6 119:11 grandchildren 75:15 grateful 134:7 great 20:9 66:17 67:11 71:22 105:14,16 128:18 greater 115:18 greatest 105:1 108:7 greatly 26:14 28:16 30:10 107:3 green 5:21,21 62:14 Griffon 9:3 44:6 gross 73:16 88:10 group 3:18 37:19 41:3 105:15 114:6 grows 85:9 Guard 29:11 guess 79:17 83:1,6,15 100:6 guidance 117:9,11,15 117:22 119:8,9 121:6 121:8,22 Guideline 2:15 116:19 guidelines 118:14,16 guy 74:17 guys 69:2,5 83:8 84:18 85:14 90:2 H Haase 4:15,15 half 113:22 hall 45:9 102:21 hallway 6:14 handful 27:5 handle 13:12 handled 29:2 handout 102:20 handset 45:19 happen 68:4,6 69:8 80:11 85:7 95:7,14 110:13 122:11 130:13 happened 68:20 69:7 83:8 85:19 119:2 132:15 133:8 happening 50:15 70:8 happens 99:11 happy 9:3 hard 21:13 24:7 74:9 77:22 80:2 105:18 hash 45:17 hazard 15:3 26:18 60:1 60:1,7,8,10,22 66:19 105:4 109:14 113:2 117:8 120:5,6,21 hazardous 58:17,19 62:16 hazards 15:14 32:14 51:8 54:9 55:17 56:2 57:11 58:12 65:1 66:22 67:1,5 73:10 110:2 117:11,17 118:15,16 119:16,20 122:1 134:9 HCA 109:18,19 HCAs 109:14 he'll 48:13 head 98:6 header 60:5 headquarters 129:3 heads 7:10 health 5:7 9:4 27:17 36:4 42:20 46:10 128:19 hear 7:5 11:3 26:2 50:4 122:8 128:16,22 129:12 133:8 heard 8:15 74:5 76:22 79:1 115:10,13,20 hearing 25:22 26:3 44:21 heart 72:4 76:8 heartache 76:17 heartbroken 72:10 heavily 52:11 heck 75:3 Heenan 4:18,18 125:16 held 29:13 36:22 44:15 79:3 80:12 Hello 128:15 help 4:12 40:10 50:14 80:14 85:4 97:1 121:22 helping 109:10 herbicides 51:18 hey 77:10,11 Hi 134:5 high 13:10 26:18 29:13 54:13 63:13 highlight 42:13 100:7 117:1 highly 53:6 55:1,8 56:7 59:11,18 114:21 115:7 hired 14:5 115:5,6 hiring 114:14 history 33:15 51:4 52:15 126:15 holding 136:7 Holmstrom 1:13 2:4,14 8:6 11:20,21 67:12,13 68:5 70:11 102:12 105:10,13 112:11,16 114:9 home 95:20 homes 16:20,20 22:4 hook 123:11 hope 9:19 18:22 20:7 24:4 35:22 68:5 89:3 135:1 horrible 78:8,14 hotline 40:13 41:2 hour 81:13 hourly 38:12 hours 59:10 house 77:1 135:21 housekeeping 6:9 huge 3:18 human 19:13 hundreds 16:19 61:7 115:6 husband 87:15 husbands 73:11 hydrocarbon 13:4 14:3 hydrocarbons 13:5 14:15 hydrochloric 51:18 I Ian 4:5 97:10 idea 53:11 56:9 identification 118:17 119:15 identified 15:5,6 54:3 56:3 59:15 identifies 109:16 117:15 119:14 identify 15:13,21 24:1 80:14 86:12 116:10 130:3,17 identifying 61:7 118:15 130:11 134:9 ignited 21:19 ignition 13:11 14:17 ILTA 125:17,21 126:8 126:11,12 127:7,12 immediately 7:17 imminent 66:19,22 67:1 67:5 impact 56:18 80:6 101:2 116:7 impacted 81:20 impacts 71:11 implement 22:19 23:19 31:8 38:3 63:18 implementation 31:18 43:8 65:3 101:9 implemented 39:2 66:5 89:6 108:7 121:21 implementing 70:14 103:16 111:8 importance 120:16,19 important 7:6 9:5,12 11:4 24:8 26:8 52:9 52:20 53:8 55:4 80:13 80:17 95:18,18 100:6 114:19 136:9,13 137:5 impossible 43:12 123:13 improperly 63:5 improve 11:7 34:2 104:11,19 111:19,21 112:20 114:13 improvement 108:1 120:20 improvements 106:1 improving 127:17

(202) 234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. 147 inadequate 35:10 130:17 inaudible 27:5 79:18 82:22 89:4 95:7 103:8 103:8 incident 2:7,9 9:15 10:18 11:5 13:16,22 14:7 15:1,20 18:6 19:14 21:7 22:5 24:2 24:11 25:8 26:13,19 26:20 27:9 30:1,8,11 30:13 36:12 38:3,8,10 39:18,19 40:19,21 41:1,5 42:1,14 44:20 50:1,16 51:2,6,7 52:3 52:12,13 53:1,13,15 55:11,18 57:14 59:10 59:17 60:3,6,21 61:16 62:1,21 64:5 65:8 68:15 71:8 72:14 80:4 88:10 90:17,19 99:6 106:3 110:3,12,14 114:11 126:6 127:10 132:15 133:9 136:21 incidents 22:11,14 23:12 24:5 27:2,4,6 37:18 38:5 40:11,12 41:6 42:7 50:15 51:22 52:1,11,19 59:21 71:6 87:1 92:12 96:17 99:7 109:7,12 110:7,9,11 111:12 113:8 120:18 136:8 137:2 incinerator 55:1 56:13 57:5 include 9:13 15:11 41:6 42:7 90:7 93:3 103:4 103:10,19 104:16 119:19 135:13 included 15:2 54:21 98:5 111:4 includes 19:2 23:20 82:5 86:3 including 13:19 14:11 15:7 25:5 29:9 31:9 86:14 87:15 90:1 99:18 114:14 119:10 incomplete 66:7 inconsistent 108:15 incorporate 109:19 incorporated 41:19 incorporating 19:18 incorrect 66:7 incorrectly 35:6 increased 30:10 56:21 57:8 incredibly 136:9 indefinite 67:16 independent 22:9 23:16 93:22 indicated 67:20 71:4 98:20 100:10 indicates 103:15 indicating 38:20 117:21 122:16 indicators 38:19 41:20 44:3 indicting 126:21 individual 120:11 individuals 125:7 industrial 28:22 42:18 96:17 104:18 106:13 106:18 Industries 16:9 18:6 industry 9:14 22:17 26:19 27:20 38:13 56:6,14,19 63:8 69:4 86:21,22 90:3 91:5 94:7,13,13,19 106:5 126:21 127:3,14 130:15 131:3 inert 58:12 influence 136:1 inform 120:20 informal 43:16 informally 101:20 information 17:8 37:18 39:4 40:15 42:6 43:17 43:19 44:10 62:7 65:22 66:3 67:15 80:14 81:11,16,21 82:1 85:9 86:17,20,21 91:8,21 92:11 93:10 109:17 137:1 informed 8:11 42:12 65:3 infrastructure 16:21 inherent 109:20 126:18 inherently 54:17,20 55:6,8,13 63:18 105:2 initial 18:17 53:17,20 98:8 initiate 18:22 118:2 initiated 16:14 106:5 initiating 105:6 initiative 113:11 injured 12:21 117:6 injuries 16:19 22:3 27:8 inner 58:16 input 17:11 25:13 44:9 47:9 70:16,19 131:20 132:2 insecticide 51:17 inside 53:7,9 55:12,18 55:21 56:1,8 57:18 58:7,9 62:22 83:18 86:15 125:7 129:8 inspect 114:21 inspecting 114:15 inspection 110:8 114:7 inspections 28:19 110:15,22 inspectors 114:6,15 installed 13:7 29:17 installing 54:22 instance 93:4 Institute 4:8 5:11,13 31:12 42:19 103:21 128:4 institution 119:11 institutions 118:3,5,10 121:2 130:17 instructors 119:12 insufficient 37:17 integrity 14:10 15:3,17 23:21 81:20 127:18 intend 35:20 62:1 121:16 intended 47:4 108:22 110:5 intent 105:9 109:4 110:17 118:21 interact 33:18,18 interaction 93:18 interconnected 68:19 interference 87:10 interim 69:13 80:3 123:8 internal 16:4 19:12 40:16 41:13 58:15 internally 42:8 67:17 international 4:2 5:5 42:21 79:12,21 125:20 132:11 interpretation 31:7 97:12 interviewed 18:19 interviews 13:20 18:17 18:17,18 intimately 90:9 91:4 intranet 42:7 intrigue 97:1 introduce 3:15 8:6 11:19 49:1,18 introduced 50:8 56:1 Introductions 2:2 invest 76:2 investigate 37:11 40:19 investigated 51:21 52:3 59:20 99:8 investigating 88:15 investigation 2:6,10 8:5 12:3,7,10 13:17,18 14:13 15:4,8,9 16:1,2 16:3,9 18:14 19:6,11 21:2 23:3 25:5 26:7 36:21 41:7 48:10 50:6 51:2,7,14,14,20 52:5 53:3,17,20 54:2 59:14 64:17 66:21 68:12,14 69:12,17 70:12,15,17 80:1 91:16 92:7,10 103:5,6 104:2,5 105:20 110:14 113:21 117:7 130:9 investigations 2:4 7:6 11:19 15:7 16:13 20:12 41:5,8,11,12 42:1,8,11,12,14 70:22 71:10 92:18,18 94:1 131:22 134:22 investigative 10:22 13:19 23:22 26:14 94:3 134:20 investigator 1:13,15,15 12:5 16:7 20:2 48:8 51:1 130:5 investigators 88:14 91:12 93:7 101:13 119:13 involved 18:13 44:2 84:13 91:4 111:7 involvement 15:14 involves 33:2 involving 86:17 iota 85:8 isocyanate 54:19 ISOs 104:19,22 105:7 issuance 64:19 issue 11:3 18:1 28:5 44:6,17 45:7 69:18 122:14 136:17 issued 24:4 36:16,18 37:22 38:16 65:15 99:17 105:21 110:19 113:6,22 117:20 issues 15:5,6,10,22 47:4 70:18 71:9,10 73:18 92:4 115:8,19 116:10 125:3 item 8:4 24:12 25:1 36:8 47:10,16 51:11 51:12 103:2 123:1 125:2 items 2:18 6:9 7:7,17 24:15 36:8 38:9 41:18 41:21 61:7 64:17 80:7 J Jane 49:5,5 January 18:7,14 135:11 jeopardizing 79:7

(202) 234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. 148 jeopardy 73:14 Jersey 29:2,10 124:3 job 29:14 32:11 62:8 65:11 69:2,6 72:13,14 72:15 76:9 94:5 119:20 122:6 132:14 133:3,14 John 5:4 132:10 Johnnie 1:13 2:5 16:7,9 joined 48:21 49:1 50:7 joining 49:18 98:15 Jr 1:9 79:14 judge 81:17 July 1:5 17:3 24:12,12 65:15 103:3,4 June 9:2 39:17 53:18 54:6 61:9 64:8 66:22 81:17 106:17 111:16 127:11 131:19 jurisdictions 104:21 jury 81:12,13,18 Justin 49:7 80:19 81:3 K Kara 1:14 3:17 Karen 4:15 Kaszniak 1:14 2:8 36:14,15 44:12 45:6 47:1 Katie 4:1 125:17,19 Katten 5:22 6:1 keep 58:19 77:10 85:13 125:8 kept 54:5 57:1 Keri 134:5,5 key 15:5,10,22 27:13 37:7 38:11 45:17 53:2 54:7 60:2 70:15 86:21 kill 76:5 killed 53:5 130:6,8 kind 66:15 70:16 72:18 76:1 85:4,12 kinds 79:1 King 4:11 knew 78:9 know 20:15 48:3 52:20 55:19 66:11 68:7,7 69:3 72:18 73:7,9 74:11 75:8,10,13,17 77:6 78:15 79:16 83:8 83:9,13,13,16,17,20 84:6,8,9,17,18,21 85:2,8,9,12,16,18,21 90:2 95:7,18 97:4 100:14 107:8 112:21 113:2 130:15 131:2 137:15 knowledge 18:3 known 15:18 26:6 54:6 81:8 126:18 knows 84:10 Krista 4:19 L La 2:10,12 8:1,12 10:16 10:20 12:10 48:10 49:12,21 51:2,6,17 52:6,13 53:12 55:9 56:22 69:20 70:1 71:12 73:5 78:20 82:2 87:1 138:1 laboratories 117:9,12 118:16 120:4 134:10 laboratory 2:15 116:19 117:5,18 119:10 120:14 lack 22:7 30:11 36:10 108:19 lacked 37:2 lacks 28:17 108:22 ladies 81:2 89:18 137:8 138:6 lagging 38:19 41:20 44:3 laid 126:13 language 104:22 105:2 108:6,10,11 109:9,22 111:4 large 9:17 10:17 57:2 57:16 98:9 larger 62:20 116:6 late 17:14 latest 20:18 106:19 launched 39:22 Laura 4:14 law 35:6 46:2 80:22 81:5 layer 22:9 layering 31:18 layers 22:20 30:14 lead 1:13,15,15 12:5 19:7 22:10 51:1 90:4 132:18 leader 40:2 leadership 96:11 107:4 leading 38:19 41:19 44:3 112:5,19,19 leak 56:10,11,20 81:11 81:22 82:9 83:14 86:13 leaked 21:17 leaking 86:5,7 leaks 13:2 75:5 81:7 learn 95:22 learned 38:12 42:4 89:2 94:8 120:20 learning 37:2 leave 9:2 leaving 57:2 led 21:20 23:3 43:19 82:6 Lee 5:21 left 128:5 Leger 49:5,5 legislation 115:17 legislative 33:15 Legislature 103:11 lends 68:15 length 65:18 lengthy 116:9 121:15 lessons 38:12 42:4 94:8 120:20 lethal 57:17 letter 127:12 133:5 letting 74:1 level 22:10 23:16 26:18 29:17 30:1 31:1 54:14 63:13 70:6 104:9 107:12 134:20 135:3 levels 58:9 119:10,20 liberal 93:15 lie 75:20 life 32:13 73:14 76:16 78:1,5 95:17 light 31:13 62:14 127:6 limb 95:17 limit 6:21 59:7 limitations 119:18 limited 26:9 28:11 line 40:5,10,20 46:2 60:4,8 89:16,16 99:15 102:9 128:7,13,14 linkages 71:9 liquid 4:2 60:4 125:20 liquids 22:15 23:22 28:15 31:22 126:2 list 108:18 125:11 listed 15:10 52:8 53:12 listen-only 3:6 lists 53:2 litigation 92:15 little 27:22 32:2 34:13 74:12 78:16,17 104:1 109:9 119:7 live 73:5,7 75:15 78:21 128:20 lived 74:13 lives 10:19 52:7 73:8,15 80:16 87:15,22 96:17 living 73:21 load 60:14 lobby 6:11 local 5:2 18:20 21:22 79:22 104:9 129:21 136:10,19 located 55:21 58:7,18 locating 55:22 location 63:7 logical 34:14 long 13:3 21:13 33:1 44:18 48:2 65:7 70:4 77:16 88:9 126:15 look 9:10 11:13 20:16 33:9,11 37:5 94:1 115:7 117:3 129:18 133:1 looked 40:22 95:12 looking 44:21 46:11 70:2 71:9,11 85:11,16 99:9,16 132:14 looks 46:1 89:15 105:7 111:20 128:11 lose 77:20 losing 72:12 loss 88:13 losses 50:13 lost 76:6 87:15 88:1 96:16 lot 72:20 77:8 83:22 85:10 90:10 96:22 115:18 Lou 5:8 Louisiana 49:8 81:4,8 love 79:7,8 loved 72:13,13 76:9,9 Lynette 8:14 49:9,9 50:10 71:17 72:2 M ma'am 89:19 Mackenzie 1:15 2:5 12:6 19:7,9 Macondo 2:5 12:7 19:6 19:10 90:19 mad 76:15 magically 78:13 magnitude 22:5 main 72:5,5 78:21 82:21 maintain 135:3 maintained 30:17 maintenance 11:2 major 28:19 54:9 90:19 107:19 108:3 109:6 110:5 majority 73:10 108:6 114:17 maker 75:9 Makers 5:11 makeup 6:4 making 18:15 51:5 76:1 86:19 87:11 88:6

(202) 234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. 149 man 85:17 95:19 managed 126:15 management 2:13 10:13 13:20 23:20 28:14 29:21 31:21 38:12 54:6 61:8 70:9 94:12 99:12 100:17 102:13 104:12 105:12 106:2,8 107:5,10 110:5 127:16 manager 82:7,20 86:1 125:19 managers 37:10 Manny 1:9 2:3,17,21 3:16 8:8,9 manufacturing 28:20 51:17 56:7 58:17 62:20 March 36:20 Marcos 128:20 Marcy 4:21 Mark 1:14 2:8 6:1 36:13 90:14 material 65:14 66:16 81:15 materials 135:16 matter 24:13 48:18 77:18 87:16 90:13,18 102:3 122:20 128:1 138:10 mature 67:21 MBQ 83:11 McCormick 5:20,20 47:15,19,21 48:4,12 102:7 124:14,20,22 McFarland 4:19,19 MCHM 18:9 mean 33:17 35:11 66:14 73:3,14 76:11 77:15,17 79:2 85:5 95:17 112:12 means 35:17 58:8 66:13 75:18 103:2 132:21,22 meant 112:11 measure 35:10 measures 36:4 38:20 89:5 100:20 101:10 107:20 108:14 109:3 109:21 measuring 72:11 mechanical 15:2,17 23:20 mechanisms 15:19 37:17 42:5 media 7:22 medical 9:1 104:7 medium 116:6 meet 17:19 30:2 101:18 124:1 meeting 1:3 2:17 3:4,15 6:5,18 7:2,11,13,19 8:5,19,21 9:1 11:14 20:8 24:14 25:2,14 35:21 36:22 44:7,15 47:11 82:6,8,22 90:22 92:2 111:17 113:15 115:13 122:18 123:2 123:5,7,14,17,21 124:1,6,9,16 131:19 133:5 135:7,8,14 137:4,6 138:4 meetings 7:14 24:17 47:5 68:7,8 90:6 123:5,20,22 124:11 124:17 133:15 134:2 135:10,12 136:7,9 member 1:8,9 3:10,12 3:14 6:2 8:10 9:3 10:7 11:15,15,17,18,21 16:6,10 19:5 20:9,10 20:13,15 24:13 25:12 26:5 32:16 44:5,10 45:3 46:8 47:13,18,20 47:22 48:6,20 49:17 50:20 65:4,8,10,20 66:6,17 67:7 68:3 69:1,9,9 70:11 71:13 71:21 79:10 80:18,22 87:3,6 89:10 91:7,15 91:20 95:1 96:5,10 97:19 98:14,19,21 99:1,3 101:5 102:5,10 112:1,1,3,4,12,12,14 112:16 114:1,3,4,5 115:9 116:2,15 122:3 122:3,5,7 124:13,18 124:19,20,21 125:1 125:19 126:9,11,22 128:2,5,6,17,22 129:9 129:13 131:1,17 132:1,3,7 134:3 135:5 137:11,13 138:3 members 1:7 6:4 8:12 10:4 12:19 14:5 20:17 21:22 28:21 36:2 48:13 50:7 96:19 101:16,19 126:3 133:17 134:12,12,15 134:18 137:22 Memorial 129:5 131:18 memory 50:18 men 74:9 mentioned 17:11 20:3 69:16 70:12 104:3,13 111:14 113:12 132:13 mercaptan 10:18 49:20 53:6 55:9 57:16,20 59:2,5,11,15 60:4 message 62:10 met 14:4 18:20 40:4 67:14 105:9 118:21 121:6 methodologies 117:16 119:15,19 methodology 98:10,13 methyl 10:17 49:20 53:6 54:19 55:9 57:15 57:20 59:2,5,11,15 60:4 methylcyclohexane... 18:9 Michelle 49:11,11 50:9 87:11 middle 19:12 22:1 midst 16:22 Miller 82:6,20 84:8 million 21:9 59:5,6 75:9 mind 114:3 mine 130:6,18 miners 130:7,8 minimize 23:11 minor 113:1 minute 101:22 112:12 minutes 6:22 48:15 101:20,21 125:9 misconduct 81:20 missed 45:10 misses 41:6 120:17 missing 130:2 mission 7:3 20:22 36:5 mistake 87:14 mitigate 15:14 mitigation 65:1 mixed 14:15 mode 3:6 model 107:7,11 modeling 14:8 modifications 66:15 modified 41:3 54:19 modify 109:19 moment 50:17,19 132:8 money 75:9,10,16 76:1 76:3,12 79:5,6 95:18 Monforton 128:12,15 128:16,18 monitor 38:2,18 63:1 monitored 40:13 41:20 monitoring 31:1 month 9:9,21 64:15 72:14 83:12 months 52:5 Morawetz 5:4,4 132:10 132:12 morning 3:12 8:10 16:11 72:2 79:13 81:2 89:18 90:7 91:1 92:9 95:20 124:6 126:10 Moss 134:5,5 motion 7:11 24:20 25:9 26:3 36:10 47:10,14 47:16,21 124:8,12,15 124:22 motions 25:3 MOTs 90:11 motto 88:3 move 20:19 33:7 36:6 92:16 moved 15:9 132:10 135:19 moving 69:12 94:3 113:11 123:10 136:4 MSG 103:7 multilingual 40:10 multiple 13:19 14:2,9 21:21 59:11 mute 6:17,18 46:4 Myers 4:22 N name 3:4,13,20 81:3 97:10 134:5 narrow 71:2 national 31:10 42:21 124:4 nature 120:3 navigate 10:8 near 41:6 75:13,15 120:17 nearby 13:2 22:4 nearly 68:21 necessary 28:10 88:6 necessitates 22:17 need 4:12 34:18 45:18 48:15 69:21 70:2 75:7 76:18 79:3 80:12 85:4 95:21 needed 10:14 54:8 116:12 130:18 needs 75:16 100:16,19 113:7 negative 57:7 125:6 neglect 74:1 negligence 73:17 88:11 neither 57:13 NEP 80:5 Nette 72:20 never 59:19 60:8 61:14 74:5,11 76:20 78:17 78:18 84:12,14 new 24:18 27:14 28:8 29:2,10 35:6 40:3

(202) 234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. 150 44:14 54:20 60:22 61:7 80:7 98:10 123:18 124:3,4 129:15 135:19 news 37:9 NFPA 22:14 28:15 31:10 nice 122:6,11 night 22:1 29:22 30:8 nights 74:19 nitrate 16:15,16 35:7 NJDP 29:10 nominated 36:3 non 32:18 non-conflicting 33:5 non-duplicative 33:5 non-routine 15:3 normal 13:11 Normally 97:19 notably 90:3 notation 24:9,12 43:22 103:1 122:15 note 3:8 24:15 36:9 98:19 123:18 noted 7:8 27:5 30:3 37:8 114:19 135:12 notes 98:9 notified 59:13 November 10:18 49:19 53:4,18 55:11 59:15 59:16 62:1 88:1 nuances 68:18 nuclear 115:4,6 number 13:20 15:5 20:1 48:21 75:18 90:1 92:8 98:5,6 113:8 114:14 114:17 117:14 numbers 45:20 numerous 12:19 14:18 33:16 38:22 nursing 16:20 nuts 84:15 NW 135:20 O O'Melveny 4:22 O-F 2:1 Obama 22:5 32:4 objections 66:16 objective 78:21 objectives 32:7 obligation 32:21 observe 10:22 obtained 86:20 obvious 88:4 obviously 19:3 34:5 107:8 Occupational 5:7 27:17 occur 15:1 56:11 110:12 occured 37:13 occurred 9:7 11:5 12:15 14:8,14 18:7 38:10 39:20 42:14 53:7,10,14,15 57:21 88:10 104:5 114:11 138:1 occurring 24:6 110:7 113:8 October 17:16 19:2 20:6 21:7 57:21 106:11 117:20 123:7 123:14 124:1 126:6 135:11,18 offender 126:18 offer 50:12 offered 10:9 127:12 office 1:13 8:2,7 12:1 39:10 49:16 96:20 102:12 123:9 137:15 Officer 5:3 40:6 80:1 offices 3:13 official 36:11 offsite 14:5 22:3 56:17 oh 48:6 76:6 oil 113:9 oils 13:4 okay 20:15 47:15 48:7 48:20 65:20 66:6,17 69:1 92:5 98:19 102:9 114:1 125:15,17 128:6,18 132:7 oldest 72:15 74:16 once 41:12 45:21 67:21 89:13 128:8 one-year-old 74:10 ones 15:10 102:21 online 121:13 open 21:18 25:21,22 30:8 40:9 43:21 44:15 45:4 46:3 54:21 57:1 60:5 71:14 89:17 96:3 102:9 103:14 104:14 106:21 118:7 125:10 128:14 opening 8:9 21:3 operate 126:3 operating 29:21 57:15 57:21 58:6 115:1 119:22 operation 11:2 13:11 31:4 57:13 85:21 136:22 operational 127:17 operations 10:11 23:8 23:10 39:20 operator 3:3,5 45:13 89:13 98:17 102:9 128:8 132:5 137:8 138:6 operators 13:20 86:12 125:22 opinion 65:12 80:8 94:9 opportunities 7:15 99:22 opportunity 6:20 7:18 9:20 20:18 24:21 44:8 65:2 79:20 92:3 97:20 125:2 126:5 127:8,21 130:2 133:17 134:15 oppose 122:17 opposing 35:12 opposition 129:14 optimistic 122:19 oral 106:16 order 53:21 54:8 57:22 67:2,3 69:17 70:13 88:21 106:6 107:13 115:12 orders 32:5 78:11 ordinances 104:18,20 organization 37:3,9,19 38:4 39:1,21 40:4,8 40:12,17,20 42:6,15 43:9 129:5,7 organizational 19:13 120:12 organizations 132:18 original 100:11 110:18 133:5 originally 47:4 85:19 OSHA 23:4,14,19 31:21 33:11 59:6 60:12 79:21 82:1 83:11 84:9 92:19 94:20 96:12,15 99:17,18 110:18 115:16,22 129:7,15 OSHA's 80:5 126:20 outdated 130:18 outlier 34:22 outlined 102:20 127:11 outlines 111:5 outreach 43:14 130:15 136:13 outset 18:22 26:6 outside 6:15 40:13 42:5 42:16 82:10 83:10 84:10,16 85:17 125:7 outstanding 26:12 65:11 69:2 overall 59:1 102:17 135:8 overdue 44:18 overfill 21:7,15 22:8 27:4,9 29:6 31:20 overfilled 21:10 overfilling 26:17 31:1 overfills 31:9 overflow 22:20 23:15 overlap 131:22 oversight 70:3 overstretched 27:21 131:4 overview 16:12 18:6 owners 125:21 oxygen 14:15 62:13 P P-R-O-C-E-E-D-I-N-G-S 3:1 p.m 124:11,17 P.S 33:16 page 62:7 63:9 65:13 65:14 82:18,18 93:4 paid 73:12,13 85:14 pain 72:11 74:14 panel 11:19 116:1 panels 74:20 116:5 paper 98:12 103:2 parallel 92:7,17 Parasram 4:3,3 21:13 Pardon 128:11 Park 73:6 75:14 part 14:2 33:21 40:16 40:20 49:18 51:19 59:6 91:22 93:17 101:14 106:3 117:7 PARTICIPANT 25:10 participants 3:6 participates 42:17 participating 137:10 138:8 participation 42:17 particular 34:4 35:14 39:13,19 40:7,18,21 41:1 44:22 116:7 133:6,16 particularly 21:12 41:22 93:3 113:8 particulate 13:14 parties 17:21 18:3,18 44:8 84:13 partner 39:5 parts 14:11 59:4 party 40:14 84:12 Pasadena 49:10,14 73:6 passage 19:4 passed 40:5 44:19 passes 47:21 124:22 path 112:7 patience 95:3

(202) 234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. 151 Paulson 5:18,18 paused 66:21 69:17 paying 81:11 pending 122:15,19 128:11 136:16 penetrations 57:2 Pennsylvania 6:12 135:20 136:5 people 40:10 42:11 43:10 48:15 51:13 53:11 68:19 71:16,22 71:22 72:12 73:6,9 74:6 75:6,20 76:5,8,9 77:10 78:1,4 79:7 83:22 84:2 85:11 87:7 95:22 96:16,19 104:6 114:20 123:12 125:11 133:8 135:9,18 percent 73:6 95:16 129:20 perception 120:11 perfectly 24:22 96:21 perform 63:22 109:18 performance 32:7 38:21 52:17,18,20 108:14,16 109:2 performing 45:1 period 51:22 60:15,17 60:20 67:19 100:21 103:3 116:18 135:7 person 62:5 84:20 personal 52:18 58:4 74:18 96:6 personally 73:8 personnel 53:13 59:14 perspective 32:14 66:21 pertains 119:5 pesticide 10:16 petrochemical 90:3 91:5 petroleum 2:6 4:8 9:7 21:2,8 22:15 24:6 25:7 29:2 30:7 31:12 42:19 103:21 106:10 126:1 128:4 PHA 15:13 60:17 61:6 61:15 63:19 97:15 PHAs 60:9,12,16,18,19 61:3,4,10 64:4 98:8,9 98:10 philosophical 27:12 philosophy 35:12 phone 6:18,20 45:16,18 46:1 89:11,15 123:12 125:13,15 128:7,10 132:4 134:4 phones 6:17 phonetic 4:12,20,21 5:21 32:12 83:3 91:13 photographs 96:16 photos 96:6,20 97:2 129:1,7 131:21 phrase 100:6 phrased 108:11 pick 45:19 picked 7:4 picking 84:20 piece 12:15 74:11 pieces 86:2 pipe 78:17 pipes 78:15 piping 57:1 68:19 place 14:19,22 55:12,18 60:3 61:21 62:21 78:14 88:8 103:1,3 108:2 135:11 placed 41:13 places 79:1 plan 61:10 64:14 70:22 100:14 136:17 plans 7:7 plant 10:16,16 40:18 73:18 80:16 82:7,20 83:2,5,18 84:8,10 85:13,20 86:1 95:10 95:11,16 115:1 plants 10:12 29:1 73:8 75:13 78:22 85:4 95:8 114:21 play 110:21 115:2 played 55:14 players 115:15 playing 73:15 plead 74:22 please 3:8 6:10,17,18 6:21 45:15,17,22 46:3 46:4 48:16 89:6,14,17 125:6,8 128:9,14 pleased 121:19 122:7 128:22 pledge 10:5 50:13 101:4 plus 79:15 podium 71:22 point 6:12 7:21 25:16 25:19 44:10 48:1 55:19 59:4 67:7 69:17 70:22 71:14 77:11 79:3 84:11 85:1 91:7 102:6 136:11 pointed 30:18 47:1 108:10 124:5 pointing 62:19 points 83:1 policies 33:12 pollution 13:6,14 pooled 21:16 poor 52:19 poorly 126:14 populations 23:7 portal 121:14 Porte 2:10,12 8:1,13 10:16,20 12:10 48:10 49:12,21 51:2,6,18 52:6,14 53:12 55:9 56:22 69:20 70:1 71:12 73:5 78:20 82:2 87:1 138:1 portends 35:1 portion 58:16 60:15 106:21 position 32:9 83:21 possibility 100:22 possible 11:6 25:10 35:22 36:1 89:8 post 14:7 42:6 97:5 post-docs 119:12 posted 37:5 129:2 posting 42:7 potential 23:11 61:4 62:16 103:19 110:3 119:18 136:15,16 potentially 26:21 71:8 71:10 109:11 110:6 110:11 122:9 pound 45:17 pounds 53:5 power 10:9 practical 10:13 120:8 practice 31:8 117:15 121:6 practices 23:1,17 31:3 41:4 pray 77:18 precautions 58:2 72:22 101:9 precipitator 12:16 14:16 precise 123:10 preliminary 12:9 69:14 133:18,21 premise 26:16 prepare 8:21 17:14 prepared 8:1 11:6 32:11 43:22 82:14 preparing 17:6,18 present 1:7,12 13:10 presentation 16:5 36:13 51:3 102:11 116:17 presentations 42:19 presented 45:6 presenting 48:9 presently 51:19 President 22:5 32:4 presiding 3:14 press 45:15,17,22 89:14 101:8 128:9 pressing 45:19 pressure 63:4,4 64:1 prevailed 81:13 prevent 30:6 31:1,9 50:14 54:8 57:17 70:7 88:13 107:19 109:11 137:2 preventable 50:1 96:17 preventative 109:8 110:15,15,21 115:2 prevented 88:11 preventing 22:16 24:5 110:6 prevention 22:8 23:15 30:20 31:20 100:9 preventive 35:10 36:4 100:20 101:9 previous 15:6 37:18 61:4 71:5 129:18 previously 17:11 29:17 107:1 111:13 126:7 Prillaman 5:1,1 79:11 79:13,14 80:19 primary 58:8 principles 55:6 prior 7:18 17:18 37:15 59:10 61:10 62:2 72:14 88:9 99:7 110:3 111:14 priorities 27:21 33:9,17 34:9 proactive 94:18 113:11 probably 51:11 78:12 problem 11:17 33:6 35:11 76:19 77:12 85:10 96:1 problems 70:4 95:12 100:7 126:18 procedures 15:4 47:2 120:1 proceed 50:21 process 2:13 11:2 13:2 13:9 15:16,21 17:8 19:12 23:19 24:10 25:21 33:1,22 34:2 38:19 52:17,19,22 54:3,19 55:17 59:21 59:22 60:1,7,9,22 62:11 67:1,4,18 70:9 70:14 71:3 81:21 92:15 94:11 102:13 104:11,19,21 105:4 105:12 106:2,7,9

(202) 234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. 152 107:5,10 109:5 110:4 113:16 114:13,21 115:3 116:4,9 122:19 131:10 processes 13:15 produce 42:13 70:17 produced 1:20 26:7 producing 24:7 product 16:1,2 70:16 production 11:8 88:21 100:4 products 13:6 22:15 29:3 126:1 profit 76:10 89:3 program 23:21 28:14 28:17 31:21 38:4 64:21 93:18 99:19 104:12 114:7 progress 15:20 18:15 53:17 86:22 87:1 103:16 projected 20:6 projects 134:17 promote 53:21 127:16 prompt 11:11 38:7 39:18 42:2 100:17 127:18 prompted 39:14 43:6 prompting 83:15 promptly 36:1 102:1 promulgated 106:6 113:4 pronunciation 80:20 proof 101:6 proper 31:4 properly 30:5 110:2 proposal 34:8,9,12 123:1 propose 32:19 33:4 proposed 23:13 25:5,6 43:20 51:9 53:22 54:10,12,14 62:7 63:9 63:11 64:14,19 106:14 108:1,17 109:20 111:7,15,19 122:8 protect 11:8 22:13 59:3 59:8 protection 22:9,20 27:16 29:11 30:14 31:11 51:16 63:12 101:10 protections 34:18,21 35:13 62:22 107:5 protective 58:4 protocols 14:10 provide 17:5 20:18 44:9 58:18 119:9 127:21 provided 1:20 39:3 43:3 63:8 64:9 106:16 126:7 129:7 provides 54:15 65:2 92:11 120:8,11 providing 16:12 18:5 31:6 provision 40:7 provisions 30:20 44:14 proximity 22:21 PSM 57:12 105:16 108:1,18,21 110:19 112:20,21 113:7 116:1,1 public 2:9,12,18 6:5 7:16,18,20 9:1 11:13 16:18 20:8 22:13 24:14,17,21 25:13,14 25:20,21 26:11 28:1 30:19 34:13 36:4,21 44:7,15,17,21 45:5,14 47:5,6,11 59:3,8 65:2 71:14,15 80:13 86:19 87:13 88:18 92:4 95:22 106:14 116:16 116:16,18 122:13,18 122:22 123:4,16,19 124:15 125:2,4 128:19 133:15 135:6 135:10 publication 120:18 121:1 publicly 67:2 published 98:11 118:8 Puerto 9:8,15 21:9 26:20 27:7 136:14 pulpit 100:7 purpose 55:20 pursuant 111:3 113:20 pursue 64:8 pursuing 112:18 put 14:22 32:21 76:17 94:14,15 99:18 112:17 114:6,8 118:22 putting 88:4 Q qualifications 114:16 114:20 quarter 123:22 quarterly 41:21 42:13 question 3:7 28:5 66:20 67:12 89:16 97:15,20 98:3 99:21 112:4 questions 20:10 65:9 93:9 97:11 98:18 99:11 112:2 122:4,6 queue 45:16 quick 48:16 82:22 quickly 3:19 92:14 quorum 6:3,4 R R12 38:16 44:1,5 R13 38:16 44:2,2 raise 92:4 raised 97:21 raises 99:11 ran 29:1,4 rare 27:4 rarely 92:13 rate 57:15 61:19 rationale 39:13 re-validated 60:13 reach 14:20,20 46:16 reached 14:16 reaching 46:11 reaction 106:3 read 33:16 38:1 65:11 75:4 76:22 79:1 82:17 91:13 reads 117:14 ready 10:6 48:3 67:10 real 16:12 90:5,16 107:18 108:19 109:1 109:18 realistic 9:13 really 68:15 94:8,20 112:7,10 115:6 128:22 134:13 reason 55:20 66:18 72:6 121:17 reasons 72:5 receive 11:11 17:21 64:13 received 9:9 10:21 19:16 29:8 46:8 67:14 receiving 13:22 84:13 recipient 103:15 recipients 17:19 20:4 recognition 50:18 120:10,13 134:8 recognize 50:6,16 71:17 95:2 127:13 recognized 43:14 56:14 56:19 recollection 52:9 recommend 23:3 28:9 recommendation 2:7,9 2:13,15 20:4 27:14 36:13,16 37:8,21 38:1 38:14,15 39:14,14,16 43:6 54:14 62:8 63:10 63:15,16,17,19,22 64:2 67:6,6 68:2 117:1,13,20 118:22 121:5,20 122:2,8 127:5 recommendations 1:14 1:16 7:6 9:14 11:7,11 17:19,20,22,22 24:3 24:11 25:6,7 27:13,19 28:11 33:12,20 36:14 36:18 38:8 39:2,5,7 39:11 41:16 43:12 51:9 53:22 54:10,12 63:11,14 64:9,10,15 64:20 66:18 67:4,8 69:7,13,19 75:1 77:10 80:9,10 88:17,20 89:8 90:8 93:5 95:13,15 102:12,14,17,19 103:4,5,9,13,17,18 104:3,8 105:7,9,11,15 105:16,18,22 106:4 107:15 108:13 111:3 111:8 113:17,20 114:10 116:20,22 119:4,6 123:15 126:19 127:9,13 129:14,18 130:3,12 130:14,22 131:2,6,9 132:17,18 recommended 39:12 59:6 104:15 111:11 117:10 118:1 121:3 121:11,18,19 122:11 recommending 64:18 recommends 23:18 reconsidering 46:19 reconvene 102:6 reconvening 48:17 record 25:20,21 36:9,11 48:19 98:20 102:4 127:1 137:20 138:11 recorded 3:9 recording 82:6,11,13 82:14,16 86:1 records 75:4 RedGuard 5:15 reduce 27:22 34:13 reduced 34:8 reducing 105:1 109:6 110:21 111:1,12 reduction 107:19,20 108:7,20 redundant 22:10 referenced 65:13 108:16 references 31:9 120:22 referrals 110:10 referred 12:13 40:16 referring 129:9

(202) 234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. 153 refineries 38:21 44:4 106:8,10 107:21 109:3 111:1,12 113:9 refinery 12:4,14,20 13:7 13:18 15:7 21:8 36:17 37:3 38:4,9 103:22 111:21 114:12 refining 28:19 41:4 reflect 27:20 33:8 52:19 64:6 126:7,22 reflects 137:21 reforms 107:10,11 112:18 refusing 88:12 regard 39:15 41:22 42:16 regarding 20:3 39:1 42:3 81:22 82:1,9 91:1 92:9,12 94:7 104:22 105:12 126:5 129:13 Regional 1:13 8:7 12:1 49:16 register 6:7 135:13,15 regular 29:8 134:2 regularly 31:4 regulated 31:6 regulates 94:20 regulation 107:2 109:4 regulations 24:19 27:15 28:5,6,8,9 29:16 30:2,5,12,13 31:16,19 32:19,20 33:2 106:2 108:2 116:8 127:15 129:16 129:21 130:4,18 131:2 132:22 regulative 31:17 regulator 107:22 109:8 109:10 110:1,20 111:5 regulators 110:16 regulatory 19:15 22:17 23:4 24:1 27:22 28:3 28:17 29:9 32:6,19 34:21 35:12 100:1 115:5 126:20 127:2 127:18 130:21 related 38:15 42:20 71:9 73:7 74:7 relates 109:9 relating 105:2 Relations 106:13,18 relationship 66:10 relative 113:2 relatively 67:19 68:6,10 release 9:18 10:17 18:10 20:7 25:4 49:20 56:17 57:16,20 61:21 63:4,5 64:1 68:22 121:13 136:6 released 9:21 12:17 35:18 36:20 53:6 89:7 106:13 releases 59:15,18,20 101:8 releasing 9:8 46:5 53:7 relevance 61:22 relevant 54:12 reliability 23:8 relieve 63:7 reluctance 15:15 remaining 108:14 remarks 49:19 125:8 126:22 remedial 41:10 108:12 remember 96:11 remind 97:6 135:9 reminders 94:9 remote 123:11 remove 13:8,14 123:2 123:16 124:15 removed 45:16 108:8 108:10 removing 108:17 110:1 renewed 94:9 reopen 88:5,21 89:4 repair 58:1 86:7,8 repeat 126:18 127:6 repeating 100:22 report 9:6,12,21 16:2 17:1,6,11,13 18:2,4 18:15 19:1,3,11 21:6 21:14 23:13 24:8,10 25:5,6,14,17 26:7 27:5,13 28:16 29:14 30:3,15,19 32:11 34:4 35:18 36:20 37:1,5 45:6 50:4,21 69:15 70:18 75:1 76:22 80:3 80:5,6,13 89:6 90:14 91:2,19 93:4 107:16 107:17 118:8,10 121:20 126:6,13 127:7 133:7,19 134:9 136:12 report's 26:16 126:19 reported 20:11 59:20 91:12 reporter 82:15 reporting 2:7,9 36:12 37:2,8 38:3,5 39:18 41:10 44:20 90:8 reports 7:5 20:22 25:22 26:1 35:2 38:8 71:7 82:9 105:21 112:21 113:5 114:19 135:4 136:7 represent 81:5 90:17 representatives 7:22 represented 46:12 represents 46:17 125:21 request 48:22 84:17 89:4 93:14 require 22:18 23:5 30:21 41:4 44:14 58:3 60:12 107:18 109:16 120:9 required 30:13 38:17 39:18 63:7 89:5 108:18 109:5 requirement 123:21 124:1 requirements 31:16 127:3 requires 38:7,11 55:20 61:3 requiring 108:6 rescue 53:10 research 117:12,18 118:4,15 120:3,14 130:16 134:10 researches 119:10 residences 16:20 residential 12:18 resolve 17:4 93:15 resources 26:9 28:11 28:18 31:15 94:21 respect 90:8 93:9 134:19 respectively 106:15 respond 32:17 98:1 responded 117:21 responders 13:21 16:18 responding 83:4 responds 84:8 response 30:22 58:22 59:7,12 100:17 110:9 110:13,19 114:9 120:13 responses 39:10 responsibility 10:11 restricted 92:1 restrictions 58:3 restrooms 6:14 result 36:16 38:13 103:21 104:4 117:4 117:10 118:6 resulted 52:2 59:19 61:6 results 42:7,12 resume 100:3 102:1,1 resumed 11:9 retaliation 38:6 retire 78:8 returning 9:1 returns 108:18 revealed 37:16 review 14:7 16:4 17:2,8 17:14 18:2 19:1,12 20:18 61:16 62:2 63:19 66:3,4 67:18,22 102:21 103:19 109:13 116:6 reviewed 14:1 60:17 65:21 107:1 reviewers 17:12 reviewing 9:11,22 67:17 102:18 107:9 122:16 reviews 20:2,3 revise 104:18 127:8 revised 39:17 44:19 109:18 Richmond 15:8 103:12 104:6,9,17 105:5 Rick 1:8 2:3,17,21 3:10 3:13 Rico 9:8,15 21:9 26:20 27:7 136:14 rigged 78:16 right 29:22 73:20 76:16 85:14 102:15 104:16 114:9 rigor 23:9 risk 22:20 23:6 28:1,14 31:20 56:21 57:8 94:16 105:1 107:18 107:20 108:6,19 109:6 111:2,12 120:11 risks 34:13 57:9 110:22 river 18:10 Rob 5:12 Robert 50:2,9,11 72:7 87:8,16 robust 22:7 61:2 64:3 ROI 94:15 role 55:15 70:3 107:22 109:8,10 110:21 111:5 115:2 124:14 127:14 roll 47:16 room 3:19 6:16 46:13 49:1 87:4 96:13,14,15 129:8 root 41:8 94:5 127:10 132:16 Ross 5:14 Rouge 49:8 81:4

(202) 234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. 154 Roulette 73:15 routed 56:12 routinely 54:4 57:1 127:1 rug 24:18 rule 29:12 30:21 106:14 108:1,17 111:8,15,20 rules 6:6 123:18 ruling 82:3 run 28:22 32:3 running 10:12 48:1 85:13 runs 115:14 rushing 8:8 11:16 Russian 73:15 S sad 95:19 safe 63:2,7 73:2 75:16 76:3 85:21 95:16 safeguards 15:12 22:11 22:17 24:4 29:7 33:6 34:15 35:14 62:4 105:3 116:12 safely 79:7 safer 54:17,20 55:6,8 55:14 63:18 88:7 105:2 safety 1:1,7,8,9,21 2:13 2:15 4:4 5:2 9:13,22 11:7 14:18,22 15:15 21:5 23:19 26:12 27:17 32:2 36:5 38:19 38:20 42:20 46:10 52:17,18,19 53:1 54:3 58:2 59:21 70:9 72:22 73:10 75:3 79:19,22 80:7,7 87:12 88:3,15 88:17 89:5 94:12 100:8 101:9 102:13 104:11,18,19,21 105:12 106:2,6,8,9 107:5,10 109:20 110:4 111:21 114:13 116:19 118:2,4,9,10 118:12,19 119:20 121:1 127:1 128:13 128:20 129:2,19 130:4,18 131:7,8,15 134:11,13,18 136:4 Sago 130:6 sample 14:3 San 128:20 Sandler 4:11,11 satisfy 109:4 Saturday 88:1 saw 65:19 saying 74:7,8 85:17 87:14 says 35:6 83:10 115:15 119:8 124:8 SBREFA 115:10,22 116:2 scenarios 61:4 schedule 2:17 48:2 64:3 123:3,4,17 124:16 scheduled 61:16 123:6 123:7 schools 75:12 scope 71:2,2 119:8 scoping 15:21 70:13,14 71:3 scrapped 130:21 scrubber 56:14 57:5 scrutiny 29:8 sealed 57:2 search 67:3 searchable 121:17 seats 10:5 second 25:9,13 26:2,3 36:10 47:12,13 79:14 97:15 107:17 119:5 124:12,13 125:1 137:12 secondary 21:17 Secondly 91:22 secret 10:2 54:5 section 37:5 92:1 100:3 sections 60:11,18 61:1 64:5 sector 9:19 41:4 see 33:6 46:18 67:4 69:7,15 78:10 87:21 94:17,22 95:22 97:2 130:1 133:9,18 seeing 133:20 seek 47:9 104:7 seen 8:15 84:15 85:6 selection 119:16 self 94:19 Senate 36:1 send 17:6 33:20 senior 1:14 36:14 38:2 38:18 sense 3:20 34:6,19 112:5 sensitive 23:7 sensors 62:12,14 sent 13:17 sentiments 94:10 separate 23:15 52:22 71:6 September 17:15 39:3 106:11 118:13 123:2 123:6,16 124:9,15 serious 26:17 27:7 29:20 51:8,22 54:3,9 59:20 65:1 99:19 100:17,19 seriously 34:7 86:10 101:3,17 seriousness 50:16 52:11 serve 126:8 served 14:17 service 79:15 Services 125:20 session 3:8 45:14 sessions 6:19 set 68:8 81:17 122:15 sets 99:17 setting 68:7 108:19,22 severe 15:16 26:21 99:19 severely 117:6 severity 30:11 shake 76:12 115:19 share 10:10 sharing 10:9 sheet 45:9 71:15 sheets 6:15 Sheppard 4:17,17 125:12,13 ship 21:11 short 28:2 48:7 61:13 67:19 100:21 shorter 13:4 shortly 12:6 48:17 86:6 show 86:8 135:18 showing 55:5 shut 15:16 85:4,6,20 86:6 shutdowns 84:1 sick 95:10,11 sickening 87:21 sign 6:15 45:9,17 125:11 signed 45:8 71:16 significant 9:9 16:19 55:15 56:2,10 70:8 silence 50:18,19 similar 15:6 29:3 54:9 55:7 60:12 62:21 82:1 113:17 133:20 similarity 29:4 simplify 32:6 simply 28:10 31:22 32:12 34:15,18 sincerely 89:3 sincerest 8:16 sir 80:21 97:9 sister 50:11 72:7 site 10:17 18:20 23:8 53:7,13,14 63:22 69:3 70:9 81:9 98:4,7 sites 28:20 sitting 10:4 85:16 situation 10:3,8 31:13 92:2 99:4,9,13,20 133:11 six 103:4,9 104:13 size 53:11 135:22 skip 85:15 slide 52:8 53:2 55:4 59:9 62:6 slides 64:6 slow 92:14 116:11 small 43:9 62:11 115:11 116:4,5 smart 76:2 Smith 80:22 81:5 snippet 55:3 SO3 86:12 Society 2:15 5:6 116:20 117:2 122:10 134:7 Society's 118:18 solely 110:14 solicitation 4:13 solutions 100:8 103:6 somebody 40:19 73:7 77:14 84:7,9 85:2 Somebody's 77:15 sons 77:21 95:5 soon 13:16 35:22 36:1 68:6,10 89:8 sorry 8:8 27:3 79:15 91:15 97:7 128:11 sort 70:18 Soto 8:14 49:9,9 50:10 71:17 72:2 sounded 59:12 source 14:17 sources 13:12 SPCC 30:21 31:16 speak 6:20 72:4 74:20 126:5 speaker 45:18 82:21 84:7 132:8 speakers 132:9 speaking 89:20 130:4 Specialist 1:14,16 36:14 specific 32:8 54:15 63:9 104:2 106:1,9 125:7 specifically 27:14 90:15 92:6 129:14 specify 32:7 speed 92:13 spent 65:6 69:3 Spill 30:20

(202) 234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. 155 spilled 30:6,9 splitting 99:10 spoke 92:9 spouse 50:10 spouses 77:21 spray 21:15 spread 30:6,9 60:14 staff 1:12 8:21 20:20 21:5,12 24:7 26:12 28:22 32:10 39:10,15 43:4,20 67:18,22 100:18 103:13 122:1 123:15 131:15 134:8 137:5,14 staffing 26:9 28:18 94:21 stage 69:15 stairs 6:11 58:7,10 stairway 58:15,20 stairways 58:13 stakeholder 9:10 20:3 90:19 stakeholders 131:16,19 137:7 stand 10:6 49:1 50:17 68:17 standard 23:20,22 29:13 40:3 99:14 108:21,22 110:5,19 112:22 113:7 119:22 standards 22:18 23:4 28:3 29:7 31:12,22 39:6 63:8 64:2 109:2 127:3,14 135:4 stands 67:8 star 45:15,22 89:14 128:9 start 61:11 62:3 64:11 70:2 88:21 100:15 102:16 124:10 125:12 started 6:8 53:18 68:14 80:6,7,11 102:8 starting 3:21 67:16 100:10 135:17 state 22:6 35:4 86:22 103:10 104:10 105:22 106:2,11 107:17 112:5 113:14,15,18 113:19 114:12 129:22 stated 27:21 53:3 61:8 64:16 107:6 statement 8:9 21:3 25:20 32:17 129:12 statements 2:20 12:1 26:4 101:7 states 27:15,17 29:11 90:1 112:6,9 120:4 126:3 stating 35:5 statistic 72:9 statues 33:14 status 16:9 19:9 20:12 50:5 64:7 65:3 102:13 102:19 statute 33:15 statutes 33:10 statutory 100:2 staying 7:12 71:20 Steelworkers 5:17 46:9 46:16 steered 90:13 Stephen 128:3 steps 33:2 69:10,12 100:4 136:20 Steve 4:7 stick 76:12 stop 85:3 137:11 stopping 79:2 storage 10:1 16:16 21:10 22:12 23:5 26:17 29:18 30:15 125:22 store 126:1 stored 35:7 storing 28:15 strategies 32:8 120:12 strategy 110:8,10 streamline 32:6 street 6:13 125:14 strengthen 38:20 strengthened 113:7 strengths 119:17 stricter 28:6 striving 120:19 strongly 26:10 structure 37:16 54:22 116:5 structured 98:11 119:22 student 117:6 students 119:11,12 study 9:20 61:15 64:1 120:15 stuff 75:12,21 77:5,8 79:1,2 84:22 85:19 124:4 subdividing 99:12 subjects 54:11 submission 46:9 submit 6:22 25:19,20 39:8 98:21 109:17,18 submitted 109:13 111:16 submitting 17:1 109:5 subsequent 12:21 35:21 47:11 123:14 substantial 111:6 substantively 112:22 113:3 substitute 127:13 successful 41:16 successfully 117:17 suddenly 132:9 suffering 72:11 sufficient 28:18 37:2 39:4 59:8 120:7 suggest 34:5 66:13 100:7,16 135:17 suggested 30:15 100:12 103:13 suggesting 28:13 suit 81:10 summarized 106:22 summary 63:13 sunshine 6:6 74:12 supervise 30:5 Supervisory 16:7 supplemental 92:11 support 4:12 122:17 126:8 129:5 132:12 supporting 62:6 supports 126:12 supposed 33:10 70:7 119:9 suppressed 91:3 sure 72:16 76:3 78:9,12 79:6 85:13 97:5 98:2 114:4 116:21 137:20 surrounding 12:18 104:7 surrounds 80:15 survey 43:13 Susan 5:10 suspend 64:11 suspicion 61:22 Sutton 4:5,5,5 97:10,10 sweep 96:2 swept 24:17 Swett 4:14,14 swift 86:18 system 2:7,9 11:2 22:8 23:9,15,16 29:18,19 30:2 32:2 36:12 41:14 41:14,18 44:20 56:14 57:5 61:14 63:21 78:10,14 92:10 123:11 systems 14:12,18,22 30:17 63:4,5 90:9,10 105:3 127:17 T T 74:14 T-A-B-L-E 2:1 table 7:5 47:10,16 tackle 127:5 take 17:9 37:11 48:7,14 48:15 76:16 88:8 101:22 133:22 135:10 136:20 taken 14:2 40:15 86:6 95:15 100:4,21 101:2 takes 85:8 92:15 103:3 talk 40:9 84:21 101:20 104:1 105:10 133:18 talked 51:13 83:21 99:6 121:8 131:1 136:14 talking 12:2,6,8 73:20 91:16 102:16 tangentially 38:15 tank 18:8 21:10,15,21 22:18 23:9,16 27:2,9 30:1,15 31:1,20 125:22 tank's 23:14 tanker 21:11 tanks 10:1 22:2,12 26:17 29:18 task 118:2,11,17 teacher 75:14 team 1:13,15,15 10:22 11:4 13:17,18 15:5 17:9 18:13 19:7,16 26:7 40:2 59:12 64:17 68:12 80:1 130:9 134:20 team's 66:21 teams 41:7 61:7 Tech 103:7 117:5 technical 4:6 14:6 17:1 19:17,20 91:11 97:11 114:16,20,21,22 115:8 134:20 135:3 technicians 119:13 technique 61:2 98:10 techniques 41:9 97:16 97:17 telephone 7:22 45:11 97:7 98:15 128:7 132:4 Telephonic 87:10 tell 72:4 74:13 76:13 85:3 telling 84:19 ten 108:15 tend 94:6 terminal 9:16 22:19 29:2,4,12 terminals 4:2 28:15 125:20 terms 36:11 69:6 101:1 107:10 117:19

(202) 234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. 156 terrible 50:13 Tesoro 113:21 test 14:10 tested 31:4 testing 14:4 tests 72:18 Texas 2:10,12 8:13 10:16 12:10 35:4,15 36:17,22,22 37:10,15 48:10 49:4,6,10,12,14 49:21 53:1 65:6 71:12 82:2 90:1,4,18 96:7 103:7 117:5 128:21 text 63:14 117:13 thank 6:2 8:11 11:13,15 11:21 16:5,6,10 19:5 19:9 20:9,13,19 21:12 21:14 24:6 32:15,16 36:15 45:3 47:22 48:20 49:17 50:20,22 65:4 69:8,9 71:13 72:1 79:9,10,19,21 80:1,8,17,18 87:2,3 89:8,10,19 92:5 94:22 95:1,3 96:5 97:6 102:5,15 105:13,18 111:21 112:1,3 114:1 114:2 116:15 122:3,6 122:21 126:4 127:20 128:2,19 131:17 132:1 133:14 134:1,2 134:3 135:4,5 137:4,4 137:8,10,14,19 138:2 138:4,6,8 Thankfully 27:2,3 thanks 95:5 thing 43:4 78:16 84:3 85:9 95:18 96:10 122:11 124:7 things 34:5 43:17,18 70:7 82:4 83:21 84:1 84:3 94:13 123:10 think 32:20 35:16 45:4 48:2,12 62:6,18 66:13 67:19 68:3,6 70:2,15 71:21 78:2 85:16 90:1 91:17 94:6 95:13 97:1 97:8 100:15 101:4 112:17,18 113:4,6 114:17 128:5 131:13 132:13 133:2,6,8,13 136:12 thinks 84:14 115:16 thinning 99:10 third 52:13 83:9 84:11 thorough 86:18 121:10 thoroughly 34:3 thought 93:7 thoughts 8:18 thousands 13:22 28:14 three 6:21 7:7,15 10:4 12:1 16:18 22:3 36:18 43:10 51:21 52:13 63:22 71:5,16 74:10 103:12 105:21 125:8 127:12,18 Tilemma 49:15 50:21 Tillema 1:15 2:11 8:2 12:8 48:8 49:15 50:5 50:22 51:1 65:4,16 66:2,9,20 67:11 68:11 69:16 71:18 92:22 98:2 99:6 time 3:5 7:7,13 20:8 29:1 39:9,11 43:5,14 43:19 44:2 46:4,6,14 53:13,14 57:14 60:5 61:3 65:5,7 67:19 68:22 82:16 84:15,15 88:9 89:9 91:3 92:7 98:17 99:2 100:21 106:6 118:20 123:3 123:10 124:10,11,17 129:17 132:5 135:1 137:18 times 33:16 56:6 75:20 Tinney 1:16 2:14,16 4:9 4:9 102:11,15 105:14 115:21 116:21 Tisnado 49:11,11,13,13 50:3,3,9,10 72:7 87:8 87:9,11 95:3,4 96:8 Tisnado's 50:10 Tisnados 8:13 87:7 today 6:4 9:11 11:3 12:2 21:7 23:13 25:2 35:17 44:16 47:7 50:7 51:3,15 54:1 76:6 87:5 117:2 125:3 126:5 127:7,22 137:6 today's 3:5 6:5 7:2 8:5 8:21 11:14 137:9 138:7 told 62:5 64:10 78:9 Tom 82:6,20 84:8 tool 127:17 top 98:6 topic 55:16 57:10 58:21 59:22 61:12 62:4 63:3 topics 54:16 135:14 Torrance 12:3,14,18 totally 58:14 touched 79:16 touchtone 45:15,22 89:15 128:10 toured 10:15 18:20 toxic 10:17 53:6 55:1,8 56:7 58:12 59:11,18 81:7 86:4,12 track 64:22 tracking 41:18 90:10 tracks 38:9 traction 41:14,21 90:10 tragedy 48:14 54:18 89:2 100:22 138:1 tragic 11:5 16:15 50:14 88:12 tragically 52:6 training 130:16 transcript 1:20 82:14 82:18 85:22 transferred 21:11 transition 135:2 transparency 24:22 travel 56:17 traveled 18:16 treatment 21:19 104:8 tremendous 69:6 trial 81:12,16,21 troubled 126:15 129:11 129:12 troubling 99:5 true 74:8 truly 73:1 try 68:9 84:3 96:2,2 113:16 125:8 trying 62:9 70:5 88:5,20 112:20 TSM 114:15 turn 3:9 16:7 turned 14:21 turns 62:15 Twelve 16:17 two 6:4 7:16 10:4 12:7 19:10 21:21 51:22 53:9 59:16 60:22 61:2 63:19 64:5,6 71:6,6 72:5,12,16 74:2 76:6 76:20 81:12 84:1,12 87:6 97:11 99:16 103:11 104:21 105:21 115:15 127:16 128:21 type 16:1 64:13 66:11 93:10 100:22 120:9 types 70:7 93:16 typically 63:15 U U.K 9:17 26:21 U.S 1:1,7,8,9,21 4:3 27:4,10 ultimately 68:1 unbelievable 87:21 uncertainty 93:14 unclear 107:22 undergoing 15:21 undergraduate 119:11 underline 136:16 underlying 65:8 underscored 9:17 understand 52:21 70:6 74:14 75:6 113:15,16 115:2 understanding 35:4 46:12 47:3 68:20 69:22 undertaken 114:12 undertaking 15:22 unfortunately 29:19 74:2 unhappy 83:14 unidentified 84:7 Union 5:5 79:12 132:11 unique 28:21 unit 13:3 14:11 51:16 51:18,19 57:20 63:12 75:8 78:8 88:6,21 89:5 United 5:16 27:15,16 29:11 46:9,16 129:5 131:18 units 13:2 15:16 37:20 43:15 University 5:19 103:7 117:5 unmute 46:4 unnecessary 131:12 unventilated 55:12 upcoming 123:4 update 2:4,10 8:1,5 11:20 19:10 48:9 updates 65:17 Upper 130:7 ups 123:11 upsets 15:16 upstairs 48:5 urgent 57:22 66:18 67:6 89:7 93:4 urges 111:13 USB 89:21 use 54:21 76:5 127:8,16 130:2 133:21 useful 134:1 user 121:16 USW 89:16,21 utmost 134:19 V vacant 10:4 vaccuum 35:14 vain 77:7 Valero 72:15 103:21

(202) 234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. 157 values 31:7 valve 21:18 valves 14:11 30:6,9 60:3 vapor 9:18 21:16,20 26:22 60:5 vapors 56:12 variable 120:3 various 13:15 14:11 42:4,17 58:8 70:6 121:7 Vassalli 4:1,1 125:17 125:18,19 vein 133:20 vent 11:2 60:5 ventilated 58:14 ventilation 57:3,11,11 57:19 58:5 61:12,14 61:18,19,22 63:21 78:10,14 verbal 6:21 verdict 81:14,18 verification 127:20 verified 43:4 verify 43:5 62:12 Veronica 1:16 2:14,16 4:9 102:11 105:13 113:12 115:19 116:18 version 106:19 107:14 109:12,13,22 Versions 106:14 107:2 victims 48:14 92:22 93:8,17,18 94:11 96:19 129:2 video 9:21 25:8 26:12 35:18 68:13 86:3 136:17 videos 86:8,11,13 96:19 Vidisha 4:3 21:13,14 32:12 136:14 view 8:3 34:3 68:21 107:15 116:11 vigilant 29:5 vigorously 100:8 violations 82:1 126:16 violators 99:19 127:6 Virginia 18:11 130:10 visit 10:20 visited 69:2 vital 76:8 87:12 voice 40:11 72:6 voices 74:5 voltages 13:10 Volume 19:17,19,20 volumes 12:7 19:10,13 20:5,7 voluntary 132:21 vote 7:7 21:6 24:9 27:11 35:17 44:1 102:18,22 103:1,2 104:4 119:1 122:18 122:20 136:17 voted 24:10 118:6 123:4 132:20 votes 25:4 122:15 voting 103:3 104:15 W Wade 50:4 waiting 85:19 walk 9:4 Walking 125:14 Walter 5:1 79:11,14 want 7:10 8:16 62:10 69:11 72:4 75:19 76:4 78:16 79:6 82:21 85:13 87:18 90:21 95:21 110:4 129:4 135:9 137:13,20 wanted 131:12 136:2 War 76:20 warn 59:3 62:15 63:1 Washington 5:19 113:14,18,20 123:20 124:4 wasn't 72:16 73:16,22 waste 60:5 wastewater 21:18 water 18:11 way 32:9 33:7 38:17 45:8 46:21 47:2 70:15 75:19 97:5 101:18 108:11 we'll 12:2 16:6 17:18,19 18:1 19:19 48:14,16 102:1 116:16 135:13 135:15 137:17 we're 15:21,22 17:6,13 18:15 19:3,18 20:4 25:16,21 33:10 46:10 48:1 53:22 54:13 68:7 70:17,18 71:3,8 75:7 78:2 85:21 91:10,16 99:9,16 101:5 102:7 119:4 122:9,12 123:21 135:7 we've 14:5 18:21 51:13 66:4 71:5 83:9,20 84:1,2,15 91:14 112:19,21 123:22 125:3 website 8:3 37:6 67:3 106:21 111:17 135:16 WEDNESDAY 1:5 week 17:9 19:17 68:8 80:8 81:12 weeks 129:18 weigh 90:12 weighed 51:5 52:9 welcome 2:2 3:3,13 welcomes 111:18 went 18:10 44:1 48:19 66:2 95:11 102:4 138:11 Wenzel 1:14 3:17 weren't 43:18 71:18 133:10 west 2:5 16:8,12,14 17:7 18:11 35:3 91:2 91:19 124:2 130:10 Western 1:13 8:7 12:1 49:16 whatsoever 34:6,19 whistleblower 81:5 101:10 White 135:21 wholeheartedly 88:19 93:20 wide 30:10 63:22 widely 39:20 wife 87:7 willingness 64:16 WilmerHale 4:20 Wise 50:2 wish 7:20 26:5 45:16 85:17 wishes 92:4 withheld 81:10,15 withholding 81:21,22 witness 86:10 witnesses 13:21 wonder 96:18 wonderful 74:6 word 66:12 words 63:16 76:18 132:10 work 7:3 10:6 15:3,14 17:10 20:20,21 21:13 24:7 34:17 56:21 57:22 60:14 70:22 72:16 77:22 78:4,11 80:2 90:2 91:6 94:2 95:19 97:3 105:14,19 107:21 114:2 120:3 134:8,12,16 137:17 worked 47:3 73:2 74:19 76:8 88:16 worker 36:4 58:2 128:20 130:4 workers 5:5 11:1,8 12:20 35:15 45:1 46:17 52:7 56:2,21 57:8 58:3 59:3 62:15 62:19 63:2 79:12,22 80:16 87:12,17 88:7 88:18 97:13 107:5 132:11 133:16 workforce 11:12 working 17:13 19:7 20:16,22 43:17,18 65:7 66:10 68:12 72:17 74:9 83:3 84:1 105:8,17 workplace 129:1,6 works 84:12 World 76:20 worried 72:19 worry 73:1 wouldn't 47:5 76:2 wrapped 85:11 write 4:13 written 7:1,8 24:9 46:9 57:22 64:14 65:12 83:1 98:21 101:7 106:16 111:16 WRO 12:8 wrong 73:3,3 76:18 wrote 133:4 X Y ya'll 80:2 Yeah 89:19 year 10:15 17:3,15,16 17:16 18:14 19:1 20:7 37:15 43:1 60:15,16 60:17,20 75:10 113:22 121:9 year-old 74:11 years 27:8 44:19 60:13 69:3 73:19 74:2 78:5 78:6 79:15 91:5 years-old 69:5 Yerkes 52:4 youngest 74:10 95:5 Z 0 0.5 59:6 1 1 45:15,22 89:14 106:14 107:2 128:9 1:00 124:11,17 10 37:5 101:22 10,000 90:20 100 63:16 95:16 102 2:14 10th 131:19

(202) 234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. 158 11 2:4 11:30 101:22 11:40 102:1,2 116 2:16 11th 54:6 64:8 66:22 12 75:6,6 130:6 120 115:18 122 2:17 125 2:18 12th 20:6 53:19 13 24:13 61:10 114:8 132 2:21 13650 107:13 13th 18:14 59:16 65:15 14 49:19 14th 10:18 59:16 103:3 15 16:17 17:15 53:4 60:18,19 61:1 88:1 15th 100:12 16 2:5 102:19 16th 53:18 123:6,16 124:9,15 17 16:14 22:2 127:11 170 43:11 1750 135:19 136:4 18 12:11 19 27:3 1970's 27:6 1984 54:18 1992 110:20 1999 13:7 19th 44:6 1st 17:16 19:2 2 2 106:15 107:2 108:8 109:12 20 36:20 2003 44:6 2005 9:16 26:20 36:17 39:17 53:1 2006 130:6 2007 36:20 39:1 75:4 103:22 2009 9:8 13:8 21:7 26:19 126:6 2010 51:21 52:2 117:6 130:7 2010-05-I-PX-R2 117:14 2011 82:8 117:20,21 2012 39:3 104:5 118:8 118:12 2013 16:15 44:11,12 118:13 2014 18:7 53:4 55:11 88:1 106:12 2015 1:5 12:11 24:12,13 49:20 62:2 81:17 106:12,17,20 119:2 2015-41 24:12 2016 17:16 19:2 2017 61:17 20th 57:22 135:11,12 21 2:5,6 21st 123:7 135:11 22 1:5 67:2,4 106:17 22nd 6:13 111:16 23 21:7 78:5 24,000 53:5 24/7 40:9 25 59:4 81:17 25th 17:3 26 75:18 106:20 28 119:2 28th 103:4 29 130:8 29CFR1910106 31:22 3 3 2:3 19:17,19 22:14 28:16 3:00 83:2 3:30 88:2 30 35:7 91:5 300 22:4 53:12 97:12 300,015 18:11 30th 17:15 31st 19:22 34 75:5 35 37:19 69:4 36 2:8 79:15 39 50:3 126:4 4 4 19:20 4.5 106:15,19 107:15 108:9 109:9,22 40 65:14 78:6 93:4 129:20 42 62:7 63:9 65:13 45 2:9 48 22:2 50:3 5 5 129:20 50 2:11 69:3 126:3 50,000 104:6 53 50:2 6 6 24:12 104:5 6:30 124:5 60 50:4 6th 123:3 7 7 82:18 700 129:19 704 22:14 71 2:12 8 9

NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W. (202) 234-4433 WASHINGTON, D.C. 20005-3701 www.nealrgross.com C E R T I F I C A T E MATTER: DATE: *IFSFCZDFSUJGZUIBUUIFBUUBDIFEUSBOTDSJQUJPOPG QBHF to inclusive are to the best of my QSPGFTTJPOBM ability a true, accurate, and complete record of the above referenced proceedings as contained on the provided audio recordingGVSUIFS UIBU*BNOFJUIFSDPVOTFMGPS OPSSFMBUFEUP OPS FNQMPZFECZBOZPGUIFQBSUJFTUPUIJTBDUJPOJO XIJDIUIJTQSPDFFEJOHIBTUBLFOQMBDFBOEGVSUIFS UIBU*BNOPUGJOBODJBMMZOPSPUIFSXJTFJOUFSFTUFE

JOUIFPVUDPNFPGUIFBDUJPO.

159 Business Meeting 07-22-15 1 159

ATTACHMENT A: STAKEHOLDER COMMENTS

DuPont Statement U.S. Chemical Safety Board Public Business Meeting July 22, 2015

DuPont appreciates the opportunity to submit this statement to the U.S. Chemical Safety Board (CSB) regarding the incident that resulted in four employee fatalities in the La Porte facility’s Insecticide Business Unit (IBU) on November 15, 2014. Our deepest concern and sympathies remain with the families and friends of our four co-workers who lost their lives. From the time that the CSB first deployed to the site in the days after the incident, DuPont has cooperated completely with the agency. Throughout the course of the investigation, we have facilitated the interviews of numerous employees, coordinated laboratory tests and field visits, and produced over 100,000 pages of information and data. We value the CSB’s perspective, and we remain committed to cooperating with the agency throughout its investigation. After the incident, DuPont immediately convened its own investigative team comprised of experts who have extensive technical experience and a proven commitment to safety. These experts have conducted a systematic and rigorous analysis of the complex circumstances associated with the incident, and have developed recommendations that will address the causal factors to help ensure that such an incident never happens again. We have already started to implement corrective actions based on the investigation team’s analysis. DuPont representatives recently met at the CSB’s Western Regional Office on July 7, 2015 to understand the CSB’s concerns. At this meeting, DuPont made clear that the La Porte IBU will not resume operations until we are certain that we can restart and operate safely. We also explained that we are developing a comprehensive and integrated plan for the resumption of operations that would address issues identified by all of the government agencies, as well as recommendations identified by DuPont’s incident investigation team. DuPont agreed it would share this integrated plan with the CSB and solicit the agency’s input. We will continue to cooperate and communicate with the CSB. As part of our commitment to process safety improvement, we take seriously any recommendations resulting from the agency’s investigation. We will learn from this incident, share the critical lessons, and do all that is necessary to ensure that such an event never happens again.

Comments to CSB board regarding Recommendation 2005-4-1-TX-R12

The United Steelworkers (USW) represent the workers at two (Whiting, IN and Toledo OH) of three remaining BP owned refineries in the US as well as workers on the Alaska North Slope. Neither of the BP refinery locals were able to send a representative to this meeting nor was the North Slope group. They did send comments and the USW International Union has compiled the responses and is passing them along in this communication. Although the recommendation specifically references the refineries, the operation of BP facilities whether production, pipeline or refining were all a concern to the represented employees and the recommendation was pursued at all locations. In addition, with the sale of BP properties that were once under this recommendation; do they now get a free pass because the employer has changed? Much of the problem is still at the site. In the case of the former BP Texas City refinery where the explosion that killed 15 workers triggered the CSB investigation, programs that BP had implemented to help address some of these issues are now being dismantled by the new employer, claiming that was BP not us, but the members see the same problems remaining in the facility. There should be an audit to see if they were/are complying with the recommendation and if not the same hazards exist and somehow need to be addressed. The locals have been less than enthusiastic about progress and report they are seeing a move back to blame the worker and behavior programs. This personal injury focus was blamed as a driver for the lack of attention to process safety concerns in the BP Texas City accident. The North Slope group has tried to use the Ombudsman set up for confidential reporting (reporting of incidents without fear of retaliation) but he has been in ill health for some time and is of no help. The deputy who employees assume has been handling the role is not an independent anonymous resource that it was promoted to be. There is a longstanding list of safety issues that have not been addressed claim workers. Employees are still required to be in non-blast proof zones with lack of egress from upper floors in manifold buildings. Valve maintenance is not at the level it should be including access to wells for water/mud injection to kill runaway or burning wells. To the company’s credit, there has been an emergency valve maintenance program initiated. The workers are concerned that once federal oversight and prohibitions are removed, BP will revert back to its old ways; they expect things to be as they were before.

The most important safety concern for the workers is the failure to address structural, mechanical and operational integrity. With oil prices being down, budget concerns are an issue at all locations. Capital jobs are being assessed and reassessed to determine whether they are still needed. Some of the fire and safety systems are old and not being well maintained, there is concern whether they will work when needed. Incident reporting was improved at one location, but there were not productive actions being taken as a result of the reporting. At another facility, workers said incident reporting has not been encouraged and operators still feel the fear of retaliation, often with discipline involved, for reporting incidents. In the lower 48 the anonymous outside reporting is said to be a feel good exercise without much happening; it is not functional. The workers have stop work authority but it is not easy to implement and make work. There is a concern about staffing levels that echoes through all three locations. These are the latest responses in regard to this recommendation (this year) below are responses to the same question asked in 2013: a. encourages the reporting of incidents without fear of retaliation

b. requires prompt corrective actions based on incident reports and recommendations, and tracks closure of action items at the refinery where the incident occurred and other affected facilities; and

c. requires communication of key lessons learned to management and hourly employees as well as to the industry.

Response from the BP locals is that the company has not fully filled this recommendation in their opinion. Some examples given to support this follow. Site 1: One incident with an amine release on a process unit caused four H2S alarms to go off and a unit was evacuated. There was some discipline given but no investigation of the event was conducted. Some of the events are being tracked in a system and there is limited sharing of some of the incidents, but the overall quality is low. There is a feeling of going through the motion and not much opportunity for feedback or review. The events can be technically claimed as done because there is encouraging of reporting and some incidents are shared with the industry, but it has a feeling of just checking off the box. Site 2: (a) Fear and reality of retaliation for reporting is clear at this site. (b) No, far from prompt corrective actions, taken over 1½ years to address one issue with a loading rack. Only a call to OSHA has been able to move this item.

(c) Yes, they are good at making it look like they are doing a good job by a large paper trail to shift blame to the employees. Site 3: (a) Issued a ‘stop unsafe work’ card to every employee (b) Have a tracking system in place which assigns and tracks to completion all action items that arise from incident investigations and reports. (c) Communication of lessons learned occurs through mandatory meetings; weekly ‘Tailgates’, monthly stand downs, monthly unit safety committees, monthly learning forum which reviews industry accidents and lessons learned. They are happening, but not effective. As you can see, not much has changed from the original response. The workers feel that the only reason they are seeing any action on the items in the recommendation are due to the scrutiny of federal agencies (CSB and OSHA) and are fearful that if this recommendation is seen as acceptable and closed, the company will quickly revert back to where it was before the BP Texas City report was issued and no one will pay any attention. The locals feel that there is still a lot of work to be done and would appreciate some follow up to judge what level of the recommendation has been completed and what work is left to be done to meet this recommendation. Thank you for your consideration of these responses in regard to the disposition of Recommendation 2005-4-1-TX-R12.

Submitted by Kim Nibarger USW HSE Department

Comments to CSB board regarding Recommendation 2005-4-1-TX-R12

The United Steelworkers (USW) represent the workers at two (Whiting, IN and Toledo OH) of three remaining BP owned refineries in the US as well as workers on the Alaska North Slope. Neither of the BP refinery locals were able to send a representative to this meeting nor was the North Slope group. They did send comments and the USW International Union has compiled the responses and is passing them along in this communication. Although the recommendation specifically references the refineries, the operation of BP facilities whether production, pipeline or refining were all a concern to the represented employees and the recommendation was pursued at all locations. In addition, with the sale of BP properties that were once under this recommendation; do they now get a free pass because the employer has changed? Much of the problem is still at the site. In the case of the former BP Texas City refinery where the explosion that killed 15 workers triggered the CSB investigation, programs that BP had implemented to help address some of these issues are now being dismantled by the new employer, claiming that was BP not us, but the members see the same problems remaining in the facility. There should be an audit to see if they were/are complying with the recommendation and if not the same hazards exist and somehow need to be addressed. The locals have been less than enthusiastic about progress and report they are seeing a move back to blame the worker and behavior programs. This personal injury focus was blamed as a driver for the lack of attention to process safety concerns in the BP Texas City accident. The North Slope group has tried to use the Ombudsman set up for confidential reporting (reporting of incidents without fear of retaliation) but he has been in ill health for some time and is of no help. The deputy who employees assume has been handling the role is not an independent anonymous resource that it was promoted to be. There is a longstanding list of safety issues that have not been addressed claim workers. Employees are still required to be in non-blast proof zones with lack of egress from upper floors in manifold buildings. Valve maintenance is not at the level it should be including access to wells for water/mud injection to kill runaway or burning wells. To the company’s credit, there has been an emergency valve maintenance program initiated. The workers are concerned that once federal oversight and prohibitions are removed, BP will revert back to its old ways; they expect things to be as they were before.

The most important safety concern for the workers is the failure to address structural, mechanical and operational integrity. With oil prices being down, budget concerns are an issue at all locations. Capital jobs are being assessed and reassessed to determine whether they are still needed. Some of the fire and safety systems are old and not being well maintained, there is concern whether they will work when needed. Incident reporting was improved at one location, but there were not productive actions being taken as a result of the reporting. At another facility, workers said incident reporting has not been encouraged and operators still feel the fear of retaliation, often with discipline involved, for reporting incidents. In the lower 48 the anonymous outside reporting is said to be a feel good exercise without much happening; it is not functional. The workers have stop work authority but it is not easy to implement and make work. There is a concern about staffing levels that echoes through all three locations. These are the latest responses in regard to this recommendation (this year) below are responses to the same question asked in 2013: a. encourages the reporting of incidents without fear of retaliation

b. requires prompt corrective actions based on incident reports and recommendations, and tracks closure of action items at the refinery where the incident occurred and other affected facilities; and

c. requires communication of key lessons learned to management and hourly employees as well as to the industry.

Response from the BP locals is that the company has not fully filled this recommendation in their opinion. Some examples given to support this follow. Site 1: One incident with an amine release on a process unit caused four H2S alarms to go off and a unit was evacuated. There was some discipline given but no investigation of the event was conducted. Some of the events are being tracked in a system and there is limited sharing of some of the incidents, but the overall quality is low. There is a feeling of going through the motion and not much opportunity for feedback or review. The events can be technically claimed as done because there is encouraging of reporting and some incidents are shared with the industry, but it has a feeling of just checking off the box. Site 2: (a) Fear and reality of retaliation for reporting is clear at this site. (b) No, far from prompt corrective actions, taken over 1½ years to address one issue with a loading rack. Only a call to OSHA has been able to move this item.

(c) Yes, they are good at making it look like they are doing a good job by a large paper trail to shift blame to the employees. Site 3: (a) Issued a ‘stop unsafe work’ card to every employee (b) Have a tracking system in place which assigns and tracks to completion all action items that arise from incident investigations and reports. (c) Communication of lessons learned occurs through mandatory meetings; weekly ‘Tailgates’, monthly stand downs, monthly unit safety committees, monthly learning forum which reviews industry accidents and lessons learned. They are happening, but not effective. As you can see, not much has changed from the original response. The workers feel that the only reason they are seeing any action on the items in the recommendation are due to the scrutiny of federal agencies (CSB and OSHA) and are fearful that if this recommendation is seen as acceptable and closed, the company will quickly revert back to where it was before the BP Texas City report was issued and no one will pay any attention. The locals feel that there is still a lot of work to be done and would appreciate some follow up to judge what level of the recommendation has been completed and what work is left to be done to meet this recommendation. Thank you for your consideration of these responses in regard to the disposition of Recommendation 2005-4-1-TX-R12.

Submitted by Kim Nibarger USW HSE Department

FD06476 | 2015_美国_CSB_DuPont_La_Porte有毒化学品泄漏_最终调查报告.pdf

分类:06_境外及港澳台调查报告 | 年份:2015 | 地域: | 严重程度: | 场所:化工/石化 | 起火原因:燃气/爆炸 | 来源格式:pdf

U.S. Chemical Safety and

Hazard Investigation Board

CSB • Interim Recommendations to DuPont La Porte, Texas 1

DuPont La Porte, Texas Chemical Facility Toxic Chemical Release Interim Recommendations

Investigation:

2015-01-I-TX Incident Date: November 15, 2014 Issue Date: September 30, 2015

CSB • Interim Recommendations to DuPont La Porte, Texas 2

Whereas:

  1. On November 15, 2014, nearly 24,000 pounds of methyl mercaptan1 was released inside the

Lannate®2 unit at the E. I. du Pont de Nemours chemical manufacturing facility in La Porte, Texas (“DuPont”).3 The release resulted in the fatalities of three operators and a shift supervisor inside the Lannate® manufacturing building (“manufacturing building”).4 The four DuPont employees5 died from a combination of asphyxia and acute exposure to toxic chemicals including methyl mercaptan.6,7 All four victims were located inside the manufacturing building—three on the third floor and one descending the stairs between the third and second floor.8

  1. Following Bhopal,9 DuPont made significant modifications to its La Porte methyl isocyanate (MIC)

process10 that incorporated inherently safer design (ISD).11 These ISD approaches included the use of an open building structure with equipment to direct leaks of highly toxic chemicals to an incinerator for destruction. However, DuPont did not effectively apply similar ISD to other chemicals it also classified as highly toxic, such as methyl mercaptan and chlorine. As a result, the methyl mercaptan release on November 15, 2014, inside an enclosed and unventilated building12 contributed to the deaths of four DuPont employees.

  1. The portion of the process where the incident took place is enclosed within a building that has no

documented design function and appears to serve no essential manufacturing purpose. However, housing the process equipment inside the enclosed manufacturing building exposed personnel to

1 Methyl mercaptan is a highly toxic, highly flammable chemical that can cause asphyxiation in poorly ventilated areas. At room temperature (above 43 °F), methyl mercaptan is a colorless gas with an unpleasant odor described as rotten cabbage. See http://www.atsdr.cdc.gov/MHMI/mmg139.pdf (accessed June 15, 2015). 2 Lannate® is the DuPont trade name for methomyl. Methomyl is an insecticide and is the generic name for S-methyl-N [(methycarbamoyl) oxy1] thioacetimaidate. 3 The majority of the methyl mercaptan was initially released onto the third floor of the manufacturing building. In addition, some methyl mercaptan was likely released from nitrogen relief valves at each of the methyl mercaptan railcar spots. 4 Three other workers were injured from their exposure to methyl mercaptan, and at least three additional workers experienced methyl mercaptan exposure symptoms. 5 The victims included operators Robert Tisnado (39), Gilbert Tisnado (48), Crystle Wise (53), and shift supervisor Wade Baker (60). 6 Methyl mercaptan is a chemical asphyxiant. Chemical asphyxiants are toxic agents that prevent red blood cells from carrying oxygen. Speegle, M. Safety, Health, and Environmental Concepts for the Process Industry, Second Edition.; Delmar: New York, 2013; p58. 7 Symptoms of methyl mercaptan toxicity also include narcosis (a state of stupor, drowsiness, or unconsciousness), and cyanosis (blue or purple coloration of the skin or mucous membranes caused by inadequate oxygenation of the blood). Centers for Disease Control and Prevention, NIOSH Pocket Guide to Chemical Hazards - Methyl Mercaptan. See http://www.cdc.gov/niosh/npg/npgd0425.html (accessed September 13, 2015). 8 One victim on the third floor was located near a methyl mercaptan leak source on the wet end (east) side. The other two victims on the third floor were on the dry end (west) side. 9 On December 3, 1984, a methyl isocyanate (MIC) release at the Union Carbide insecticide plant in Bhopal, India resulted in an estimated 3,800 people that died within days, and tens of thousands that were injured. Eventually, the release killed tens of thousands of people. See http://www.csb.gov/on-30th-anniversary-of-fatal-chemical-release-that-killed-thousands-in-bhopal- india-csb-safety-message-warns-it-could-happen-again-/?pg=4 (accessed June 17, 2015). 10 MIC is a raw material used in the production of insecticides at La Porte including the Lannate® process. 11 According to the Center for Chemical Process Safety (CCPS), “inherently safer design solutions eliminate or mitigate the hazard by using materials and process conditions that are less hazardous.” Center for Chemical Process Safety (CCPS). Inherently Safer Chemical Processes – A Life Cycle Approach. 2nd ed., Section 5.1.1, 2009. 12 At the time of the incident, the manufacturing building ventilation fans were not operating. This information is further detailed below.

CSB • Interim Recommendations to DuPont La Porte, Texas 3 highly toxic chemical exposure and asphyxiation hazards that DuPont has not effectively identified or controlled.

  1. The DuPont manufacturing building design introduces all of the increased personnel hazards, but

offers none of the beneficial off-site risk reduction of a containment building.13 The DuPont manufacturing building is not designed to limit the impact of a toxic chemical leak by containing the leak and routing it to a destruction device such as an incinerator or scrubber. Vapors from highly toxic chemical leaks are trapped and concentrated inside the building, increasing risk to workers. Additionally, by DuPont’s design, the manufacturing building ventilation system discharges these highly toxic chemical leaks from the roof of the manufacturing building to the outdoor surroundings, resulting in no risk-reduction benefit to the public.

  1. The manufacturing building ventilation fans were classified as critical process safety equipment by

DuPont, meaning their failure could result in a high consequence event. A design objective of the ventilation fans was to “control contaminants to acceptable work place exposure levels.” However, neither fan was in operation at the time of the incident. The CSB’s preliminary calculations indicate that even with both fans operating, ventilation would likely have been insufficient to avoid a lethal atmosphere inside the manufacturing building because of the amount of toxic gas released.14,15

  1. At the time of the incident, the manufacturing building ventilation fan for the portion of the unit

where the methyl mercaptan was released (wet end fan) was not operating despite an “urgent”16 maintenance work order written on October 20, 2014, nearly a month prior to the incident. The loss of the ventilation fan did not result in any additional safety precautions, such as enhanced operational or emergency response planning, restricted worker access to the manufacturing building, or increased personal protective equipment (PPE) requirements.

  1. As a result of the release, the manufacturing building stairways were contaminated with highly toxic

and highly flammable methyl mercaptan. The stairways were not a safe location for workers. However, these stairways provide the primary means to access the equipment or exit the building in the event of an emergency. The stairways are designed for fire escape, but DuPont has not effectively evaluated entry or exit for toxic gas hazards or in an oxygen-deficient environment.17 There is no

13 A containment building is an enclosure around process equipment to contain potential releases to the environment. Companies typically use containment buildings to reduce off-site risk. DuPont has stated that the Lannate® manufacturing building is not a containment building. 14 The IDLH for methyl mercaptan is 150 parts per million (ppm). See http://www.cdc.gov/niosh/idlh/74931.html (accessed July 8, 2015). According to OSHA, “Immediately dangerous to life or health (IDLH) means an atmosphere that poses an immediate threat to life, would cause irreversible adverse health effects, or would impair an individual's ability to escape from a dangerous atmosphere.” See https://www.osha.gov/pls/oshaweb/owadisp.show_document?p_table=STANDARDS&p_id=12716 (accessed July 8, 2015). 15 For methyl mercaptan, the 10-minute AEGL-2 (disabling) is 40 ppm and the 10-minute AEGL-3 (lethal) is 120 ppm. “AEGL-2 is the airborne concentration (expressed as ppm or mg/m3) of a substance above which it is predicted that the general population, including susceptible individuals, could experience irreversible or other serious, long-lasting adverse health effects or an impaired ability to escape. AEGL-3 is the airborne concentration (expressed as ppm or mg/m3) of a substance above which it is predicted that the general population, including susceptible individuals, could experience life-threatening health effects or death.” See http://www.ncbi.nlm.nih.gov/books/NBK201324/ (accessed September 22, 2015). 16 While the timing to complete an “urgent” worker order is not specifically defined, based on CSB’s review of DuPont records and interviews conducted with DuPont employees, it has a practical meaning of two to three days. 17 Some portions of the manufacturing building can also be accessed by an elevator or with ladders.

CSB • Interim Recommendations to DuPont La Porte, Texas 4

ventilation provided in the manufacturing building’s stairways. Furthermore, the internal doors between those stairways and the process areas do not provide an effective barrier to keep hazardous gases released in the process areas from entering the stairways.

  1. DuPont’s methyl mercaptan detection system does not effectively warn workers or protect the public

from highly toxic chemical exposure. The methyl mercaptan detector concentration alarm point is above the permissible exposure limit for workers18 and DuPont’s response to a detector alarm is not sufficient to protect the public. For example, during the hours prior to the November 15, 2014 incident, multiple highly toxic chemical gas detectors alarmed (sounded).19 However, the DuPont emergency response team (ERT) was not notified and the area was not cleared of personnel. In addition, methyl mercaptan releases on November 13 and 14, 2014, were identified by methyl mercaptan detectors, but were never reported as releases nor investigated as serious process safety incidents.

  1. DuPont’s process hazard analyses (PHAs) and relief system design scenarios do not effectively

identify hazards from nonroutine operations, such as opening valves to connect the liquid methyl mercaptan piping to the vapor waste gas vent header—the piping connection that provided the pathway for the methyl mercaptan release in this incident.20 Along the methyl mercaptan feed line there were three locations where it was connected by valves to the waste gas vent header piping. At the time of the incident, one of these valves was fully open and a second valve was slightly open.

  1. PHAs performed on the insecticide manufacturing process did not sufficiently identify and control

process hazards. Post-incident, DuPont has conducted new baseline PHAs for two of its 15 Insecticide Business Unit (IBU) PHAs. These post-incident PHA teams applied a more robust hazard analysis methodology and, as a result, identified many new potential hazardous events and developed hundreds of associated corrective action items. DuPont has agreed to develop and implement a revised schedule to expedite the cyclical reviews for the remaining IBU PHAs, and the final schedule will prioritize high-hazard processes. Some of these PHAs will be redone prior to restart. In addition, DuPont has retained a third-party consultant to review the existing IBU PHAs prior to restart.

  1. The manufacturing building air dilution ventilation system has never been evaluated by a PHA or

robust engineering analysis.

18 The methyl mercaptan detectors alarm at 25 parts per million (ppm) – well above the OSHA recommended permissible exposure limit (PEL) of 0.5 ppm and the OSHA enforceable PEL ceiling limit of 10 ppm. OSHA recommends that employers consider using the alternative occupational exposure limits because the agency believes that exposures above some of these alternative occupational exposure limits may be hazardous to workers, even when the exposure levels are in compliance with the relevant PELs. See https://www.osha.gov/dsg/annotated-pels/ (accessed June 15, 2015). The Cal-OSHA permissible exposure limit (PEL) is an 8-hour time weighted average (TWA) of 0.5 ppm and the NIOSH recommended exposure limit (REL) is a 15- minute ceiling limit of 0.5 ppm. See https://www.osha.gov/dsg/annotated-pels/tablez-1.html (accessed June 15, 2015). 19 The methyl mercaptan gas detectors alarm on the Lannate® control room operator’s computer screen. There is no audible or visible alarm provided in the field for outside personnel. 20 The vapor waste gas vent header is piping intended to remove excess or unwanted vapor from the process and route it to an incinerator for thermal destruction (combustion).

CSB • Interim Recommendations to DuPont La Porte, Texas 5

  1. The area of the manufacturing building where the largest methyl mercaptan release occurred during

the incident has never been tested for ventilation flow rate or effective distribution of dilution air. Although DuPont mechanical integrity procedures call for annual air flow testing, the manufacturing building ventilation system for the immediate area impacted by the methyl mercaptan release (the wet end fan) had never been tested for flow rate or effective distribution of dilution air.

  1. The (IBU) process analyzer houses21 are infrequently entered, but they are equipped with more robust

asphyxiation safeguards (oxygen detectors and alarms) than the normally occupied manufacturing building. However, the manufacturing building—which lacks the same level of asphyxiation safeguards—has significantly larger inventories of hazardous chemicals, has unventilated areas, and is regularly occupied by workers.

  1. DuPont has been in the process of implementing a five-year program at La Porte to validate that

pressure relief systems comply with existing DuPont standards, process safety regulations, and industry codes and standards. DuPont has not made this program a sufficiently high priority and additional outside resources are needed for effective completion. Although the program is more than four years into the five-year plan, IBU relief systems are only 35% complete.

  1. The CSB identified pressure relief systems in the insecticide manufacturing process that are

improperly designed and do not meet the requirements of industry codes and standards. As a result, these relief systems do not effectively ensure that highly toxic, highly flammable, and asphyxiating chemicals are discharged to safe locations. For example, during the incident an atmospheric release of highly toxic and highly flammable liquid methyl mercaptan likely occurred through a relief system intended to release and disburse nitrogen vapor. This relief system is part of the 35% of systems DuPont considers complete and in compliance with industry codes and standards. However, the alignment of block valves at the time of the incident revealed a highly toxic methyl mercaptan release scenario that DuPont’s five-year relief system compliance program never considered.

  1. On June 11, 2015, the CSB investigation team concluded that DuPont planned to resume insecticide

manufacturing operations at the facility in August 2015 without addressing the important process safety issues described above. The CSB investigation team informed DuPont officials that it would pursue recommendations to address the significant process safety issues identified. The CSB investigation has identified many significant process safety management issues at the La Porte facility. Throughout the investigation, as these process safety issues were identified, the CSB communicated and discussed these concerns with DuPont officials in order to promote needed improvements and prevent future similar occurrences. 22

  1. On July 2, 2015, DuPont committed to addressing the process safety issues identified by the CSB. In

a written statement provided to the CSB and certain media outlets on September 3, 2015, DuPont described the completion of their investigation into the November 15, 2014 incident. In this

21 Analyzer houses are small enclosed buildings to protect process analyzer equipment for improved reliability. 22 The CSB raised many other process safety concerns to DuPont officials. Many of these process safety issues have been included in DuPont’s pre-startup corrective actions. These additional process safety issues that DuPont agreed to address are outside the scope of this interim recommendations document, but will be further detailed in future CSB investigation work products.

CSB • Interim Recommendations to DuPont La Porte, Texas 6

communication, DuPont also reiterated its commitment to implementing the CSB recommendations presented during the July 22, 2015 CSB public business meeting. DuPont also stated that the La Porte crop protection units will not restart until these actions have been completed. The CSB is encouraged by DuPont’s commitment to address these recommendations. However, formal recommendations are being issued so that the Board can evaluate and track to completion DuPont’s mitigation of the identified hazards.

  1. Board procedures authorize the development and issuance of interim safety recommendations before

a final investigation report is completed.

  1. Process safety concepts including the important role of transparency between industry and the public

in improving health and safety for the facility and the surrounding communities, active workforce participation, the hierarchy of controls, inherently safer design, reducing the risk of major accidents to the greatest extent feasible, effective safeguards, and nonroutine work are discussed, but not fully explained in this document. CSB analysis related to these process safety topics are more fully described in the CSB’s DuPont Belle, Chevron Richmond, and Tesoro Anacortes investigation reports. Rather than repeat this information which is applicable to DuPont La Porte, these reports are incorporated into this CSB work product by reference. These reports can be accessed at www.csb.gov.

CSB • Interim Recommendations to DuPont La Porte, Texas 7 Accordingly: Pursuant to its authority under 42 U.S.C. §7412(r)(6)(C)(i) and (ii), and in the interest of promoting safer operations at US facilities handling chemicals and protecting workers and communities from hazards, the Board makes the following interim safety recommendations to the DuPont chemical manufacturing facility in La Porte, Texas and the International Chemical Workers Union Council of the United Food and Commercial Workers: DuPont La Porte, Texas Chemical Facility 2015-01-I-TX-R1 Inherently Safer Design Review Prior to resuming Insecticide Business Unit (IBU) manufacturing operations, conduct a comprehensive engineering analysis of the manufacturing building and the discharge of pressure relief systems with toxic chemical scenarios to assess potential inherently safer design options. At a minimum, evaluate the use of an open building structure, and the direction of toxic chemical leaks and the discharge of pressure relief systems with toxic chemical scenarios to a destruction system. Implement inherently safer design principles to the greatest extent feasible and effectively apply the hierarchy of controls such that neither workers nor the public are harmed from potential highly toxic chemical releases. Detail the analysis, findings, and corrective actions in a written report and make this report available to DuPont La Porte employees, their representatives, and the CSB. 2015-01-I-TX-R223 Ensure Manufacturing Building is Safe for Workers Prior to resuming Insecticide Business Unit (IBU) manufacturing operations, conduct a robust engineering evaluation of the manufacturing building and the dilution air ventilation system that includes the implementation of corrective action(s) to the greatest extent feasible in order to ensure a safe environment for all workers. Develop a documented design basis for the manufacturing building and the air dilution ventilation system that identifies effective controls for highly toxic, asphyxiation, and flammability hazards and implement these controls to the greatest extent feasible. Address nonroutine operations and emergency response activities in the design basis. The design basis for the manufacturing building and the dilution air ventilation system must use the hierarchy of controls and inherently safer design principles to the greatest extent feasible. 2015-01-I-TX-R3 Ensure Relief System Design is Safe for Workers and the Public

23 It is understood that depending on the mitigation approach taken by DuPont some aspects of recommendation R1 or recommendation R2 may not be applicable in the future. The CSB recommendations program provides sufficient flexibility to allow a recommendation to be “no longer applicable” following the CSB’s recommendation evaluation process. For example, if DuPont moves the equipment containing highly toxic chemicals to an open outdoor structure to address recommendation R1 the evaluation of the air dilution ventilation system in recommendation R2 may no longer be applicable.

CSB • Interim Recommendations to DuPont La Porte, Texas 8

Prior to resuming manufacturing operations, ensure all Insecticides Business Unit (IBU) pressure relief systems are routed to a safe location and effectively apply the hierarchy of controls to protect workers and the public. Commission a pressure relief device analysis, consistent with API Standard 521 and the ASME Code, including a field review. Include an evaluation of relief system discharge location to ensure that relief systems are discharged to a safe location that will prevent toxic exposure, flammability, or asphyxiation hazards in order to ensure public and worker health and safety to the greatest extent feasible. Include an evaluation of relief scenarios consistent with API Standard 521. 2015-01-I-TX-R4 Perform More Robust Process Hazard Analyses Develop and implement an expedited schedule to perform more robust process hazard analyses (PHAs) consistent with R1, R2, and R3 for all units within the Insecticides Business Unit (IBU). At a minimum, the PHAs must effectively identify and control the hazards referenced in this document utilizing the hierarchy of controls. The PHA schedule must be prioritized based on anticipated risks to the public and workers in order to ensure that the highest risk areas receive priority consideration. At a minimum, the more robust PHAs must be consistent with the approach applied to post-incident reviews described above in paragraph 10. 2015-01-I-TX-R5 Ensure Active Workforce Participation Work together with the International Chemical Workers Union Council of the United Food and Commercial Workers (ICWUC/UFCW) Local 900C and the ICWUC/UFCW staff (at the request of the local) to develop and implement a plan to ensure active participation of the workforce and their representatives in the implementation of Recommendations R1 through R4. In addition, provide a copy of DuPont’s integrated plan for restart to La Porte workers and their local union representatives. 2015-01-I-TX-R6 Public Transparency and Accountability Make publicly available (on a website) a summary of the DuPont November 15, 2014 incident investigation report, the integrated plan for restart, and actions to be taken for the implementation of Recommendations R1 through R5. This website must be periodically updated to accurately reflect the integrated plan for restart and implementation of Recommendations R1 through R5.

CSB • Interim Recommendations to DuPont La Porte, Texas 9 International Chemical Workers Union Council (ICWUC) of the United Food and Commercial Workers (UFCW) and Local 900C 2015-01-I-TX-R7 Ensure Active Workforce Participation Work together with DuPont to develop and implement a plan to ensure active participation of the workforce and their representatives in the implementation of Recommendations R1 through R4.

CSB • Interim Recommendations to DuPont La Porte, Texas 10

Appendix: Information to Support Recommendations Incident Consequences

  1. On November 15, 2014, nearly 24,000 pounds of methyl mercaptan24 was released within the

Lannate® unit at the DuPont La Porte chemical manufacturing facility (“DuPont”) in La Porte, Texas.25 Methyl mercaptan is a highly toxic, highly flammable chemical that can cause asphyxiation.26

  1. The release resulted in the deaths of three operators and a shift supervisor inside the Lannate®

manufacturing building (“manufacturing building”). The four DuPont employees27 died from a combination of asphyxia and acute exposure to toxic chemicals including methyl mercaptan. All four victims were located inside the manufacturing building—three on the third floor and one descending the stairs between the third and second floor.28

  1. Due to the extremely low odor threshold29 of methyl mercaptan,30 portions of the greater Houston

area downwind of the facility detected the release, but no off-site injuries have been reported. Process Overview

  1. DuPont has several business units located at the La Porte, Texas, facility. Each unit is focused on

a different chemical business area. The incident took place in the Insecticide Business Unit (IBU).31 Portions of the IBU process units are located inside a four-story, enclosed manufacturing building shown in Figure 1.

24 At room temperature (above 43 °F), methyl mercaptan is a colorless gas with an unpleasant odor described as rotten cabbage. Exposure in poorly ventilated, enclosed, or low lying areas can result in asphyxiation. See http://www.atsdr.cdc.gov/MHMI/mmg139.pdf (accessed June 15, 2015). 25 The majority of the methyl mercaptan was initially released onto the third floor of the manufacturing building. In addition, methyl mercaptan was likely released from each of the nitrogen relief valves at the methyl mercaptan railcar spots. 26 DuPont’s corporate standard for the management of highly toxic materials identifies both methyl mercaptan and chlorine as highly toxic. DuPont considers a material to be highly toxic if it is handled, stored, or shipped in a sufficient quantity that, as the result of a credible event could result in an ERPG-3 concentration, and has a substance hazards index (SHI) greater than or equal to 4,000. DuPont determines the SHI using vapor pressure and ERPG-3 data for each chemical. Using this approach, DuPont derived a SHI of 19,855 for methyl mercaptan and 385,197 for chlorine. 27 The victims included Crystle Wise (53), Robert Tisnado (39), Gilbert Tisnado (48), and Wade Baker (60). 28 One victim on the third floor was located near a methyl mercaptan leak source on the wet end (east) side. The other two victims on the third floor were on the dry end (west) side. 29 Odor threshold, in general is the lowest concentration of a gas or a material’s vapor that can be detected by odor. Odor threshold values are not fixed physiological parameters or physical constants but are statistical points representing the best estimate value from a group of individual responses. Murnane, Sharon, S.; Lehocky, Alex, H.; Owens, Patrick, D. Odor Thresholds for Chemicals with Established Occupational Health Standards, Second Edition; AIHA: Falls Church, Virginia, 2013; p 2. 30 The odor threshold for methyl mercaptan is approximately two parts per billion (2 ppb). However, olfactory fatigue is known to occur with methyl mercaptan, resulting in the exposed person to no longer being able to detect the chemical by smell. As a result, odor may not provide adequate warning of hazardous concentrations. See http://www.atsdr.cdc.gov/MHMI/mmg139.pdf (accessed June 15, 2015). 31 In addition to the IBU, the facility has a Herbicides Business Unit (HBU) and a Fluoroproducts Business Unit (FBU). The FBU includes a anhydrous hydrogen fluoride (HF) manufacturing unit. FBU assets were transferred to Chemours on July 1, 2015.

CSB • Interim Recommendations to DuPont La Porte, Texas 11

Figure 1. East side of the manufacturing building at the DuPont La Porte insecticide production facility.

located on the outside wall of the manufacturing building (Figure 2):32 Lannate®, which is DuPont’s trade name for methomyl33; and Agricultural Products Intermediates (API), which produces insecticides and nematicides known as Vydate®, the trade name for oxamyl.34

material in the production of insecticides. The incident took place within the Lannate® area of the process.35,36 32 The IBU processes share a common control room. 33 Methomyl is the generic name for S-methyl-N [(methycarbamoyl) oxy1] thioacetimaidate. 34 Oxamyl is the generic name for Methyl 2-(Dimethylamino)-N-Hydroxy- 2-Oxoethanimidothioa. In addition to being an insecticide, oxamyl also functions as a nematicide. “Plant parasitic nematodes are among the most important crop pathogens in the United States, causing an estimated $7-9 billion in lost yield annually.” See https://www.sbir.gov/sbirsearch/detail/147642 (accessed July 17, 2015). 35 Lannate® and API are not in distinctly different locations. At some points, Lannate® and API equipment are side by side. 36 The IBU is further subdivided into four functional areas: the wet end, MIC (methyl isocyanate), the damp end, and the dry end. The wet end contains liquid reaction equipment. MIC contains equipment to generate and consume the methyl isocyanate intermediate. The damp end isolates and dries insecticide crystals. The dry end processes the crystals and packages them into various products.

CSB • Interim Recommendations to DuPont La Porte, Texas 12

Figure 2. Sign on the outside wall of the manufacturing building showing the two primary product lines – Lannate® and API (Vydate®) for the IBU at the DuPont La Porte facility. Manufacturing Building Ventilation Design

  1. The main portion of the manufacturing building is separated on each floor by an internal wall.

The east side of the wall is where liquids processing equipment is located and is referred to as the “wet end.” The west side of the wall is where liquids are removed via damp and dry processing equipment and is referred to as the “dry end.” The Vydate® product is a liquid, while the Lannate® products are powders.

  1. Inside the manufacturing building, the internal wall that separates the east and west sides is

equipped with fire doors that allow worker access between the wet and dry ends, as shown in Figure 3. By design, these doors are intended to be closed, but at times the doors were left propped open. In addition to adversely affecting the fire protection design, opening the doors provides a path for released chemicals on one side of the room to infiltrate to the other side.

Figure 3. Doors within the manufacturing building on the 3rd floor that separate the east (wet end) and west (dry end) sides. Although intended by design to remain closed, these doors were propped open at times, as shown in the photograph of door 304 on the right.

CSB • Interim Recommendations to DuPont La Porte, Texas 13

Figure 4. Roof of the manufacturing building showing the dry end fan (left), wet end fan (right), and location of the internal wall (middle) that separates each side within the building.

  1. The two sides of the building are separately ventilated by fans located on the roof of the building

as shown above in Figure 4. The manufacturing building is designed to make use of these roof- mounted fans via a dilution air ventilation system that operates as shown in Figure 5 through Figure 8. Fresh air is drawn into each floor on each side of the building, entering at floor level through a mechanical louver system.37 Air is designed to flow from the fresh air louvers, across the process equipment, and up into return ducts located at the ceiling along the internal wall to sweep away any flammable gases.38 Exhaust air on each side of each floor moves inside the ceiling-mounted duct towards the north end of the building (Figure 5 and Figure 7), where it is collected in a vertical duct header that directs the exhaust air from all of the floors on each side up towards the respective (wet or dry end) dilution air exhaust fan on the roof (Figure 6 and Figure 8). Exhaust air from the fans is discharged directly to atmosphere. Contaminants are not removed via any kind of environmental destruction system such as a scrubber or incinerator.

37 The louver is a set of angled slats or flat strips fixed or hung at regular intervals in a shutter to allow air to pass through. 38 DuPont records indicate that the manufacturing building ventilation system design code is NFPA 497, Recommended Practice for the Classification of Flammable Liquids, Gases, or Vapors and of Hazardous (classified) Locations for Electrical Installations in Chemical Process Areas. NFPA 497 defines adequate ventilation as being sufficient to ensure that the concentration of flammable gases does not exceed 25 percent of the lower explosion limit (LEL). DuPont’s methyl mercaptan safety data sheet (SDS) indicates that the LEL for methyl mercaptan is 3.9 percent.

CSB • Interim Recommendations to DuPont La Porte, Texas 14

Figure 5. Simplified graphic representation of a typical floor of the manufacturing building showing how fresh air is pulled in from the outside walls, sweeps across the floor, and enters the exhaust return air ducts on each side.

CSB • Interim Recommendations to DuPont La Porte, Texas 15

Figure 6. Simplified graphic cutout of the manufacturing building showing how the air dilution ventilation exhaust duct at each floor connects to the external vertical duct header and the roof mounted exhaust fans.

CSB • Interim Recommendations to DuPont La Porte, Texas 16

Figure 7. Typical air inlet louvers (left) and air outlet duct that exhausts the air towards the fans on the roof. The air louvers are located near the floor on the outside walls of each side of the manufacturing building and air is drawn to the center. The exhaust air ducts are located near the ceiling on the internal wall of each side of the manufacturing building.

Figure 8. The dry end fan (left photo) and the exhaust air duct work (right photo). The exhaust air ducts from each floor are connected on the north side of the manufacturing building and air is pulled up through the fans and exhausted to atmosphere. Note – the dry end fan was not operational at the time this photo was taken.

CSB • Interim Recommendations to DuPont La Porte, Texas 17 Pre-Incident Activities 2011 Debottleneck and Emissions Reduction Project

  1. In 2011, DuPont invested approximately 20 million dollars to implement a project to increase

production rates and reduce environmental emissions for the IBU.39 The key piece of equipment installed was the nitrogen oxides (NOx) reduced scrubbed incinerator (NRS) shown in Figure 9.40

Figure 9. NRS Incinerator installed in 2011 to reduce emissions and allow increased production at the DuPont La Porte insecticide manufacturing facility.

39 The DuPont Lannate® was a sold out product and DuPont was routinely looking for opportunities to increase capacity. 40 The NOx (nitrogen oxides) reducing scrubbed (NRS) incinerator system is a vertical thermal oxidizer system for the destruction of organics, halogenated organics, and nitrogen-containing wastes with removal of acid gas from discharge.

CSB • Interim Recommendations to DuPont La Porte, Texas 18

throughout the process. One of these waste gas streams contains methyl mercaptan vapor collected in a process vent system referred to as the waste gas vent header piping. This header originates from various Lannate® and API process vessels, from methyl mercaptan railcar unloading facilities, and from the methyl mercaptan storage tank. The waste gas vent header piping provides the path for these waste gas streams to be directed to the NRS Incinerator for thermal destruction (combustion).

pressure events in equipment connected to the waste gas vent header piping.41 DuPont determined one significant cause of these high pressure events was liquid accumulation in the vapor waste gas vent header piping.42 The waste gas vent header piping to the NRS Incinerator was designed and installed in 2011without sufficient consideration of liquid accumulation. For example, it contained low points where liquid could accumulate, and there was no engineered equipment provided, such as a knock out drum,43 to safely remove liquid from the waste gas vent header piping system.44 Because some of the process vents contained water vapor, the common belief was that the accumulated liquid consisted primarily of condensed water with small amounts of other process chemicals, including methyl mercaptan.45 As a result, to address high pressure events in the waste gas vent header piping operators were instructed to routinely open manual drain valves from the waste gas vent header piping to the atmosphere, directing the liquid towards floor drains located within the manufacturing building (Figure 10).46 41 The high pressure in the waste gas vent header piping restricted vent sources flowing into the header, causing high pressure events in process equipment. These high pressure events could result in relief valves opening and discharging hazardous chemicals to the atmosphere. 42 DuPont personnel believe the likely source of liquid accumulation was condensation from saturated vapor streams that originated in equipment operating above ambient temperatures. As these vapor streams entered the cooler waste gas vent header, liquid could condense and accumulate over time. 43 A knock out drum is an industry term for a process vessel that provides for separation of vapor and liquid. 44 The CSB identified three locations in the waste gas vent header piping to the NRS incinerator where liquid could accumulate: 1) inside manufacturing building (Figure 10); 2) the piping outside the manufacturing building as the piping passes through the MIC unit; and, 3) at detonation arresters just prior to where the waste gas from the waste gas vent header enters the NRS incinerator. Each location is equipped with a drain valve —two locations have atmospheric drains and only one location’s drain is routed to a caustic scrubber. 45 The liquid that was routinely drained from this system was never sampled and analyzed. Daily instructions—beginning April 14, 2014, and continuing until the incident—requested the operators to sample the unknown liquid. DuPont wanted a sample of the dark liquid reported for subsequent laboratory analysis to identify its chemical composition. This liquid was reported to have had a strong, noxious odor of sulfur compounds. 46 DuPont never completed a management of change or established a formal procedure to drain liquid from the waste gas vent header. Rather, operators were directed to drain the system through written instructions in a daily instruction log book to operations staff. Beginning January 14, 2014, and continuing until the incident, the daily instructions required operators to drain the methyl mercaptan waste gas vent header “low point” on the 3rd floor once per shift by directing the liquid through a hose under a running safety shower until the liquid flow stops.

CSB • Interim Recommendations to DuPont La Porte, Texas 19

Figure 10. Waste gas vent header piping on the third floor of the manufacturing building. This portion, where several waste gas sources come together, is referred to as the waste gas vent header. Waste gas from this portion of the vent header travels up to reach the NRS Incinerator, a piping configuration that creates a low spot where liquid accumulates. To remove the liquid during waste gas vent header piping high pressure events, operators were instructed to open valves (yellow circle) and drain the system through a hose routed to a floor drain located near a safety shower. The floor drain is connected an open trench-type sump on the first floor. At the time of the incident, a second set of drain valves (red circle) were also opened directly to the floor inside the manufacturing building. This photo was taken while facing south. See Figure 11 for a view of the equipment while facing north.

CSB • Interim Recommendations to DuPont La Porte, Texas 20

Figure 11. Waste gas vent header piping on the 3rd floor of the manufacturing building. This photograph was taken while facing north. Figure 10 shows the same waste gas vent header piping but taken while facing south. A 3-way valve (purple) is controlled to send the waste gas to either the NRS incinerator labeled “A” (orange) or a caustic scrubber labeled “B” (green). The caustic scrubber is designed with a vapor equalization line labeled “C” (red) that connects to the vapor space of the caustic receiver on the floor below (2nd floor). Prior to the installation of the NRS Incinerator, the 3-way valve did not exist and liquid that might accumulate in the waste gas vent header piping could freely drain into the caustic scrubber system. Ventilation Fans Not In Service

  1. Neither ventilation fan was operational at the time of the November 15, 2014 incident. The wet

end fan and the dry end fan had poor reliability. The dry end fan had been down since June 2014, five months prior to the incident, due to an electrical problem. The wet end fan was shut down on October 20, 2014, because it was making a noise significant enough that DuPont operators turned it off and wrote an “urgent” 47 work order to have it repaired. Unit Shutdown – Key Raw Material Diluted with Water

  1. The incident chain of events began on Monday, November 10, 2014, with the unloading of an

acetaldehyde oxime (“AAO”) tank truck. AAO is a raw material for the Lannate® insecticide

47 While the timing required to complete an “urgent” worker order is not specifically defined, based on CSB’s review of DuPont records and interviews conducted with DuPont employees, it has a practical meaning of two to three days.

CSB • Interim Recommendations to DuPont La Porte, Texas 21 process. On Monday, during the unloading of an AAO tank truck, a water dilution system was inadvertently activated, and it continued to flow after the truck unloading was completed. Ultimately, the AAO storage tank overflowed.48 The water diluted the normally 50 percent (%) AAO, 50% water mixture inside the tank to approximately 24% AAO, which is outside of normal parameters. The diluted AAO caused operating difficulties that forced a shutdown of the Lannate® insecticide process. Startup Attempted – Plugging Identified in Reaction System

  1. Modifications to the AAO concentration control system were made to address the diluted AAO.

On Wednesday, November 12, 2014, DuPont operators attempted to restart the Lannate® process. However, during the shutdown, the methyl mercaptan reaction section, which generates a salt- slurry material, had plugged (Figure 12), and flow could not be established to accomplish the restart.

Figure 12. Snippet from CSB animation depicting the salt-slurry plugging within the methyl mercaptan reaction system.

  1. Plugging of the equipment by the salt-slurry material following a shutdown is common.

However, even though routine practices existed there were no written procedures for how to clear the reaction system. To clear the system, operators put hot water both outside and inside of the equipment, a historical site practice that typically clears the plug. Eventually, the salt-slurry material within the methyl mercaptan reaction system was cleared and another startup was

48 During the AAO truck unloading, a block valve downstream of what should have been an out-of-service water dilution control valve was inadvertently opened, allowing water to flow into the tank. The water dilution system had been installed in 2006 when container shipments of 100% AAO were judged to be more economical. AAO is now typically purchased and stored as a 50% solution with water. A logistical problem resulted in an unusual delivery of 50% AAO by tank truck instead of by railcar. Two factors contributed to the tank overflow incident. First, DuPont did not have a procedure for unloading a 50% tank truck of AAO. In addition, the AAO water dilution control valve was supposed to interlock closed when: 1) the truck unloading pump was off; or, 2) when the AAO tank had a high liquid level. However, the interlock function had been bypassed in the field so that water could be used to decontaminate the tank during the turnaround in spring 2014. Instrument air supply tubing was connected directly to the interlock valve actuator, bypassing the interlock activation solenoid, and forcing the valve to remain fully open. The interlock could not function because the bypass was not removed at the completion of the turnaround.

CSB • Interim Recommendations to DuPont La Porte, Texas 22

attempted. However, this startup attempt also failed because flow of methyl mercaptan could not be established. Although the reaction section was now clear, there was additional plugging located in the methyl mercaptan feed line between the methyl mercaptan storage tank and the reaction system. DuPont personnel have stated to the CSB that plugging in this area had never previously occurred. Unlike the reaction system routine practices were never established to clear the methyl mercaptan feed line. Similar to the reaction system, DuPont written procedures were not developed to clear the methyl mercaptan feed line. Water Inadvertently Added to Methyl Mercaptan—Forms Hydrate Blockage

  1. A review of process data revealed that on Wednesday night (November 12, 2014), the level in the

methyl mercaptan storage tank (Figure 13) rose approximately 2%. Approximately 2,000 pounds of water had likely been inadvertently sent to the methyl mercaptan storage tank as a result of the operational activities that took place during attempts to clear process equipment plugging in the reactor system fed from the upstream methyl mercaptan storage tank.49 This tank level rise was not noticed at the time.50 The methyl mercaptan storage tank and the feed line to the reaction system now contained a mixture of methyl mercaptan and water.

  1. Water combining with methyl mercaptan does not normally create a hazard. However, at low

temperatures (≤ 52 °F) water and methyl mercaptan form a solid, ice-like material commonly referred to as a “hydrate.”51 Temperatures in the Houston area for the 24 hours preceding the incident averaged approximately 40 °F and had been consistently below 55 °F since Tuesday, November 11, 2014. Formation of a hydrate in the methyl mercaptan feed system caused the unusual plugging and inability to initiate feed of methyl mercaptan to the reaction system. At this time, DuPont operations personnel were unaware of the back-flow of water into the methyl mercaptan storage tank. Nor did they realize that the methyl mercaptan feed system was contaminated with water and that hydrate was the source of the plugging. To resume production, DuPont would need to warm the contents of the feed system in order to dissociate (melt) the solid hydrate material back to a liquid mixture of water and methyl mercaptan.52

49 The water source was located downstream of the methyl mercaptan storage tank and entered the system from the reverse of its normal flow path. 50 Because the initial tank level was already high, the addition of nearly 2,000 pounds of water was sufficient to trigger a high level alarm at 9:56:03 pm and an emergency high level alarm at 11:28:21 pm on November 12, 2014. However, these alarms were not acknowledged until 5:42:44 am on November 13, 2014. 51 DuPont personnel commonly refer to the methyl mercaptan clathrate hydrate simply as a “hydrate.” The clathrate hydrate dissociates at approximately 52 °F. See Mohammadi, Amir H., and Richon, Dominique, 2011. “Equilibrium Data of Sulfur Dioxide and Methyl Mercaptan Clathrate Hydrates,” Journal of Chemical & Engineering Data, 2011, Vol. 56, pp. 1666–1668. 52 Although the methyl mercaptan hydrate with water had been identified in DuPont’s methyl mercaptan technical standard and in PHAs years earlier, DuPont never implemented safeguards, such as heat tracing, or developed a procedure to safely dissociate the hydrate.

CSB • Interim Recommendations to DuPont La Porte, Texas 23

Figure 13. The yellow box outlines the 18,000 gallon methyl mercaptan storage tank at the DuPont facility in La Porte, Texas. Both the Lannate® and Vydate® insecticide processes use methyl mercaptan as a key raw material. Activities During the Shift Before the Incident

  1. Two significant changes occurred on Friday morning (November 14, 2014). The first change was

the start of a different group of operations personnel on shift. Most had not been at the site since before the AAO tank dilution and overflow incident had occurred and they were learning of the situation for the first time. They were unaware of the required shutdown and of the difficulties with reaction system plugging and the plugging of the methyl mercaptan feed system. The second change was the initial concerted involvement of a DuPont Technical Team of managers and engineers in the methyl mercaptan feed system troubleshooting activities. During the morning, unit engineers and managers (DuPont Technical Team) met as a group with the day shift supervisor to discuss the methyl mercaptan plugging problem and to develop a plan to clear the piping so that both the Lannate® and the API processes could be restarted. This meeting identified the likely scenario that water had entered the methyl mercaptan system and a solid hydrate was developed. DuPont’s methyl mercaptan technical standard identifies the potential formation of a hydrate at low temperatures. The technical standard states, “[methyl mercaptan] will form a hydrate with water, which is a solid below 40 deg F per information provided by a [methyl mercaptan] supplier.” Based on this understanding, the DuPont Technical Team requested that operators put hot water on the outside of the methyl mercaptan feed piping, under the insulation, to warm the piping and its contents to dissociate the hydrate back to liquid methyl mercaptan and water (Figure 14).

CSB • Interim Recommendations to DuPont La Porte, Texas 24

Figure 14. Hot water hose positioned on the liquid methyl mercaptan feed piping to flow hot water between the piping and the insulation in an effort to heat the piping and dissociate the solid hydrate that formed after water inadvertently entered the mercaptan storage tank.

Figure 15. Snippet from CSB animation depicting DuPont’s use of hot water hoses placed under the insulation to provide heat to dissociate the hydrate back to methyl mercaptan and water.

CSB • Interim Recommendations to DuPont La Porte, Texas 25

  1. The DuPont Technical Team realized that when heated methyl mercaptan would expand and

would need a safe place to vent to avoid overpressure of the feed line. To address this concern, DuPont operations personnel opened valves between the methyl mercaptan feed line and the waste gas vent header. Along the methyl mercaptan feed line there were three locations where it was connected by valves to the waste gas vent header— piping intended to remove excess or unwanted vapor from the process and route it to the NRS incinerator for thermal destruction. DuPont personnel used pressure gauges at those three valves (Figure 16) to determine where the blockage was, and what progress they were making to clear it. At the time of the incident, one of these three valves between the methyl mercaptan feed system and the waste gas vent header was fully open. A second valve was slightly open.

Figure 16. Snippet from CSB animation depicting the three locations where valves connected the methyl mercaptan feed line (blue) to the waste gas vent header (orange) piping. Pressure gauges shown at these locations were used to monitor the progress of clearing the hydrate blockage inside the methyl mercaptan feed line.

  1. Although required by EPA’s Risk Management Plan (RMP)53 rule, OSHA’s Process Safety

Management (PSM)54 standard, and their own company standards, DuPont did not develop written procedures, conduct any type of hazard analysis for abnormal conditions, carry out a job safety analysis, perform a management of change, nor conduct any other type of hazard analysis prior to implementing the plan the DuPont Technical Team developed that morning. For example, there was no systematic safety review of the use of the valves connecting the methyl mercaptan feed line to the waste gas vent header. Additionally, there was no development of a written procedure to guide operations or to track success of the plan or progress toward clearing the entire methyl mercaptan feed system.

  1. DuPont management relied upon verbal communication of the plan to the day shift supervisor.

At the end of the day shift, DuPont relied on the face-to-face verbal communication between shift supervisors to transition the efforts to the night shift. This night shift supervisor was learning of

53 EPA Risk Management Plan, U.S.C. Section 42, Chapter 85, Subchapter I, Part A, Section 7412(r). 54 OSHA Process Safety Management of Highly Hazardous Chemicals Standard, 29 CFR §1910.119.

CSB • Interim Recommendations to DuPont La Porte, Texas 26

the shutdown and subsequent startup difficulties for the first time.55 Although the DuPont Technical Team verbally communicated with the day shift supervisor, the Team did not meet with the newly-involved night shift supervisor nor did they communicate verbally or in writing with the night shift operations personnel. In addition, DuPont did not provide on-site technical (engineering) personnel to support the night shift.56

  1. The DuPont operations day shift began implementing the plan that the DuPont Technical Team

developed by applying hot water under the insulation and on the outside of the liquid methyl mercaptan piping.57 DuPont operators started this process at the methyl mercaptan storage tank and the associated methyl mercaptan feed pump piping segments, and then worked their way down the methyl mercaptan feed line towards the reaction system. Pressure gauges at each of the three block valves between the liquid methyl mercaptan feed line and the vapor waste gas vent header piping system were used to determine the success and progress of the work. Using these valves in this way followed the plan developed by the DuPont Technical Team. However, this alignment created a direct path between the feed system and the waste gas vent header, which was outside of DuPont’s design intent. It had not been effectively evaluated under DuPont’s process safety management systems. The Incident

  1. After shift change, the night shift continued implementing the plan that was developed earlier that

day by the DuPont Technical Team. Initially, the night shift operations personnel determined that some of the piping at the methyl mercaptan storage tank was either still plugged or had plugged again. They began their activities by working to clear this section. They applied hot water to the outside of the liquid methyl mercaptan piping steadily working their way towards the reaction system.

  1. Eventually, DuPont operations personnel tested to determine if they could establish methyl

mercaptan flow to the reaction system. The methyl mercaptan pump to Lannate® was in operation and circulation back to the tank was established. However, when they attempted to feed forward to the reaction system they could not establish methyl mercaptan flow. DuPont operations staff concluded that too much hydrate plugging remained, and at approximately 1:30 am on Saturday (November 15, 2014), they temporarily halted troubleshooting and went back to the control room to take a break and discuss how to proceed. During their break, the pump remained on circulating methyl mercaptan and the hot water was still heating the methyl mercaptan piping. Additionally, one of the valves between the liquid methyl mercaptan feed line and the waste gas vent header piping was cracked open and a second valve was fully open (Figure 17).

55 The only written communication to the night shift supervisor was a note in the shift log that stated “Unplugging M[e]SH Header.” MeSH is DuPont’s abbreviation for methyl mercaptan. 56 DuPont technical personnel are routinely on call to provide support. 57 Applying hot water to the outside of the methyl mercaptan liquid piping system was outside of the design considerations for the thermal expansion relief valve on this system. As previously stated, DuPont did not perform management of change prior to instructing operations personnel to use the hot water. DuPont Standards, as well as the EPA RMP and OSHA PSM regulations, required DuPont personnel to conduct a management of change review.

CSB • Interim Recommendations to DuPont La Porte, Texas 27

Figure 17. The fully open valve (left photo) and the cracked open valve (right photo) between the methyl mercaptan feed line and the waste gas vent header. These post-incident photos show the valve positions at the time of the incident.

  1. A post-incident evaluation of process data identified that the level in the methyl mercaptan

storage tank began to drop at approximately 2:45 am. Liquid methyl mercaptan had started to flow into the waste gas vent header piping (Figure 18). This was likely caused by the hydrate being dissociated sufficiently to allow liquid to flow forward and through the connections opened between the liquid methyl mercaptan piping and the waste gas vent header piping. However, the drop in methyl mercaptan storage tank level was not detected, because the level was still within normal operating limits.

Figure 18. Snippet from CSB animation depicting the piping arrangement that allowed liquid methyl mercaptan from the feed line (blue) to flow into the waste gas vent header piping (orange).

CSB • Interim Recommendations to DuPont La Porte, Texas 28

the level in the methyl mercaptan storage tank was decreasing. The methyl mercaptan being fed to the system by the pump followed the path of least resistance through the opened valve into the waste gas vent header piping. The presence of methyl mercaptan in the vent header began to cause high pressure in the waste gas vent header. Operations personnel became aware of the high pressure when other insecticide manufacturing equipment venting into the waste gas vent header began to exhibit high pressure alarms. At this point, operations personnel shifted their attention from the problem of plugging in the methyl mercaptan feed system to the current problem of high pressure in the waste gas vent header piping to the NRS Incinerator. Recall that high pressure events in the waste gas vent header piping to the NRS Incinerator had been a relatively common problem since the NRS Incinerator was installed in 2011. Figure 19. Overhead photo of the DuPont La Porte IBU showing the location of the control room, manufacturing building, railcar spots, and methyl mercaptan storage tank.

  1. On the night of the incident, DuPont operations staff did not correlate the high pressure problem

with the unusual activities (hydrate dissociation) surrounding the plugging of the methyl mercaptan feed line. Rather, they attributed the high pressure event to the routine problem of liquid accumulation in the waste gas vent header piping. They responded to the high pressure with the routine line draining practices that had been successful in the past. Normally when operations personnel opened the valves shown in Figure 10 a dark liquid with a strong sulfurous odor would drain. However, this time a nearly pure stream of highly toxic and highly flammable methyl mercaptan was released filling the room with vapor where there was no active mechanical air dilution ventilation.

CSB • Interim Recommendations to DuPont La Porte, Texas 29 Distress Call

  1. Approximately fifteen minutes after the DuPont operations personnel (Shift Supervisor and

Operator 1) separately went to drain the waste gas vent header piping, Operator 1 made an urgent call over the radio for help. From the tone and urgency of the message, it was obviously an emergency situation; however, the nature and location of the emergency were not effectively communicated.58

  1. After hearing the distress call, the control room operator tried to get more information through

radio communication, but neither of the workers in the building responded. Two other operators (Operator 2 and Operator 3) in the control room then ran to the manufacturing building to respond to the distress call. Another operator (Operator 4), who was outside, saw Operator 2 and Operator 3 running into the building and followed them. These three operators did not realize they were responding to a dangerous, highly toxic, and highly flammable gas release. They did not wear or take with them any respiratory personal protective equipment (PPE).

  1. Simultaneous to the distress call, an operator (Operator 5) working on the first floor of the

manufacturing building began to feel dizzy and to have blurry vision. Operator 5 realized he was in trouble and managed to exit the building where he immediately fell to the ground. Shortly after he had fresh air to breathe, he began to recover.

  1. The three operators (Operators 2, 3, and 4), who responded to the distress call by Operator 1,

acted separately and all took different routes into the manufacturing building. Operator 2 entered the south stairway and likely went directly to the third floor where he was fatally overcome by methyl mercaptan. Operator 3 thought the distress call indicated the problem was on the fourth floor, so he ran up the south stairway to the fourth floor but could not find anyone. Operator 3 did not have a radio, so he called on the IBU public address system and stated that he did not see anyone on the fourth floor. The control room operator told him to check the third floor, but Operator 3 began to feel light-headed. He made his way back into the south stairway, but was overcome by the methyl mercaptan exposure. Operator 3 lost consciousness while descending the stairs from the fourth floor, bumping his head and breaking his glasses when he fell. Operator 3 regained consciousness about 45 minutes later and managed to exit the building on his own volition. He was subsequently transported to the hospital when emergency responders observed he was disoriented from his exposure. Operator 4 entered the process portion within the manufacturing building from the south stairway onto the second floor. He walked about ten feet into the manufacturing building and hit what he described as a “wall” of methyl mercaptan. He began to feel woozy, light headed, and nauseated, but managed to retreat back to the south stairway.

  1. Except for the initial public address call from Operator 3, the Lannate® control room operator

could not get any responses on the public address system or by radio from either the original two workers in the building or any of the three operators. After the lack of response from the field

58 Some DuPont personnel who heard the distress call informed the CSB that they interpreted the urgent communication to indicate that Operator 1 had a personal injury, such as a broken leg. They were not aware of the highly toxic methyl mercaptan leak.

CSB • Interim Recommendations to DuPont La Porte, Texas 30

operators, another board operator (Operator 6), who was the brother of Operator 2, began to prepare to head to the building. Other operators in the control room told him not to enter the building because of the unknown severity of the situation. However, Operator 6 headed toward the manufacturing building, taking three five-minute emergency escape air bottles (Figure 20).

Figure 20. Photo of the 5-minute escape air bottles and 30-minute self-contained breathing apparatus (SCBA) on the third floor, dry end (west) side of the manufacturing building following the incident. The third 5-minute escape air bottle was put on Operator 4 and was left at the control room entrance. The 30-minute SCBA was originally just outside the door to the third floor entrance at the south stairway. It is presumed that Operator 6 grabbed this SCBA prior to entering the third floor.

  1. Entering the south stairway, Operator 6 encountered Operator 4 disoriented from the exposure

that had occurred on the second floor. Operator 6 put an escape air bag over the head of Operator 4 and opened the valve on the escape air bottle. Operator 6 put the second of the three escape air bags on himself, opened the valve to his air bottle, and continued up the stairs to the third floor. With the aid of the fresh air escape pack, Operator 4’s symptoms improved, and he was able to exit the building safely.

  1. The Lannate® control room operator called for the plant emergency response team (ERT) to

respond. The ERT originally believed they were responding to a rescue situation such as an injury, not a highly toxic and highly flammable chemical release. As a result, they arrived with rescue equipment, but did not have adequate personal protective equipment (PPE) to enter the building. About an hour and a half after the initial distress call, the ERT obtained appropriate PPE and was able to make an initial entry into the manufacturing building.

  1. The Shift Supervisor, Operator 1, Operator 2, and Operator 6 were all located by emergency

responders, but none were responsive. The drain valves from the waste gas vent header on the third floor (Figure 10) were found open with methyl mercaptan flowing from them. The Shift

CSB • Interim Recommendations to DuPont La Porte, Texas 31 Supervisor was located on the third floor approximately 30 feet north of the drain valves. Operator 1 was located in the north stairway. It appeared that Operator 1 had succumbed before reaching the second floor while descending from the third floor. Emergency responders found Operator 6 next to his brother (Operator 2) on the dry end side of the building. Operator 2 had the third of the escape air bags brought by Operator 6 on his head. Operator 6 had a self- contained breathing apparatus (SCBA) 30-minute air bottle in front of him and the mask on his face, but he had not connected the mask to the air bottle. It is likely that Operator 6 had entered the third floor and when he found Operator 2 down he put the third escape air bag over Operator 2’s head. When his own escape pack began to run out of air, Operator 6 tried to put on an SCBA that was located on the third floor. However, it appears that Operator 6 was fatally overcome from methyl mercaptan before he could connect his breathing air mask to the SCBA. Key Findings Not Applying Inherently Safer Design Lessons More Broadly

  1. DuPont did not effectively control worker exposure to highly toxic chemical and asphyxiation

hazards inside the manufacturing building despite the similar process safety hazards DuPont addressed following the Bhopal methyl isocyanate (MIC) incident in 1984.59 After Bhopal, DuPont made major technology changes to the MIC process at La Porte that focused on inherently safer design. DuPont approved the MIC project on January 30, 1985, and completed construction on the high-priority, expedited project only four months later on April 30, 1985. The inherently safer design improvements included moving the MIC processing equipment outside of the manufacturing building and using an outdoor open structure design to eliminate the need for dilution air ventilation (Figure 21). In addition, unlike the Lannate® and API processing equipment that contain highly toxic materials, such as methyl mercaptan and chlorine, pressure relief systems on equipment containing highly toxic MIC are routed to an incinerator for destruction.

Figure 21. DuPont moved its MIC process equipment to an open structure design (outside of the manufacturing building) after the 1984 Bhopal incident. DuPont documents identify this as an inherently safer approach.

59 DuPont standards identify methyl isocyanate, methyl mercaptan, and chlorine as highly toxic materials (HTM). “[…] [The HTM standard] is intended to focus on materials that are highly toxic and highly volatile, such that they pose significant acute exposure risks to people off-site if accidentally released. Acute exposure, in this context, involves potentially life-threatening health effects resulting from up to a 60-minute exposure period.”

CSB • Interim Recommendations to DuPont La Porte, Texas 32

inherently safer design principles be applied. DuPont’s corporate standard for process hazard analysis states: Inherently safer technology (IST) should be applied where it reduces process hazards and makes good sense. Processes are made inherently safer through the elimination of hazards rather than their control. As a result, the use of ISP [inherently safer process] technology sometimes referred to as inherently safer technology or IST is an approach to the safe design and operation of facilities. PHAs include the activities of hazard identification, consequence analysis, hazards evaluation, interlock evaluation, human factors evaluation, facility evaluation, inherently safer process (ISP) evaluation, and development of recommendations. Opportunities for making a process inherently safer can be identified at any time during the life cycle of the process. Project and cyclical PHAs typically provide such opportunities and they should be capitalized to the greatest extent possible. Cyclic [PHA] reviews shall review the existing process in an effort to identify further opportunities for the application of ISP [inherently safer process] concepts in either the current process or a future generation of the process. Consequently, DuPont’s process safety programs require that inherently safer design principles, such as the open building of MIC, be applied to all processes “to the greatest extent possible.”

purpose, yet housing the process equipment inside the enclosed manufacturing building exposed personnel to highly toxic chemical exposure and asphyxiation hazards that DuPont has not effectively identified or controlled. For example, DuPont has never performed a PHA on the building ventilation system. In addition, DuPont PHAs identify that the enclosed manufacturing building creates hazards, such as flammability, toxic exposure, and asphyxiation. However, these same PHAs do not claim that benefits are provided by enclosing the process equipment in a building. The manufacturing building is never used as a safeguard in a DuPont PHA. After reviewing technical documents and interviewing DuPont technical staff, the CSB learned that the chemical processing taking place on the wet and dry end in this area does not require the vast majority of this equipment to be located inside a building.60 DuPont could eliminate these hazards to workers by using the inherently safer design approach applied to the MIC process and locating this equipment outside of an enclosed structure. 60 The packaging area of the building on the ground floor (west side) may have a legitimate need to be inside a building. Dust control and keeping the packaging equipment and methomyl product dry appear to be important considerations that may justify keeping packaging area equipment housed inside a building.

CSB • Interim Recommendations to DuPont La Porte, Texas 33

  1. The recognized safety tradeoff with toxic chemical containment buildings is that, while they

reduce risk to the community, they trap and concentrate material from leaks inside the building, increasing risk to personnel.61 The DuPont manufacturing building was not designed as a containment building. As a result, it introduces all of the increased personnel hazards of a containment building, but offers none of the beneficial off-site risk reduction for the community. The DuPont manufacturing building has the same increased risk to personnel that a containment building has—toxic leaks are trapped and concentrated inside the building. Furthermore, the DuPont manufacturing building is not designed to limit the impact of a toxic chemical leak off- site by containing the leak and routing it to a destruction device such as an incinerator or scrubber. Instead, the manufacturing building ventilation air exits the fans on the roof of the building directly to atmosphere. With no additional destruction device, the manufacturing building does not decrease risk of chemical exposure to the public.62,63

  1. The ventilation design for the manufacturing building does not take into consideration toxic

chemical exposure hazards even though the building contains two highly toxic materials, chlorine and methyl mercaptan.64 DuPont records indicate that the dilution air ventilation design is based on providing sufficient ventilation to ensure that the concentration of flammable gases does not exceed 25 percent of the lower explosion limit (LEL).65 However, there are no LEL detectors for the manufacturing building to monitor the atmospheric conditions and alert workers of potential fire or explosion conditions. Furthermore, a methyl mercaptan concentration of 25 percent of the LEL is equivalent to 65 times the IDLH.66

  1. The DuPont manufacturing building does not have adequate dilution air ventilation or sufficient

air monitoring to ensure the safety of workers. There are multiple potential inhalation hazards inside the building including nitrogen, and the highly toxic materials chlorine and methyl mercaptan. To ensure protection from these hazards, CSB investigators only entered the building while accompanied by a contracted industrial hygienist performing continuous air monitoring, and only while wearing air-purifying respirators and carrying 5-minute escape bottles. All CSB investigator building entries began with a trip to the roof of the building to visually verify that the

61 See Center for Chemical Process Safety (CCPS). “Inherently Safer Chemical Processes – A Life Cycle Approach.” 2009; pg 58-59. 62 Ibid. 63 The DuPont corporate PHA standard references this same CCPS publication (Inherently Safer Chemical Processes – A Life Cycle Approach) when discussing how to approach making processes inherently safer. 64 DuPont’s design objective for the ventilation system states, “The main objectives of industrial ventilation for the LANNATE®/API manufacturing building are to: a. control contaminants to acceptable work place exposure levels, e.g. comply with OSHA regulation or Corporate AELs (acceptable exposure limits), and b. prevent fires and explosions.” However, the actual design calculations do not take toxics into consideration. In addition, DuPont has not established an AEL for methyl mercaptan. 65 DuPont records indicate that the manufacturing building ventilation system design code is NFPA 497, Recommended Practice for the Classification of Flammable Liquids, Gases, or Vapors and of Hazardous (Classified) Locations for Electrical Installations in Chemical Process Areas. NFPA 497 defines adequate ventilation as that sufficient to ensure that the concentration of flammable gases does not exceed 25 percent of the lower explosion limit (LEL). 66 The IDLH for methyl mercaptan is 150 parts per million (ppm). See http://www.cdc.gov/niosh/idlh/74931.html (accessed July 8, 2015). According to OSHA, “Immediately dangerous to life or health (IDLH) means an atmosphere that poses an immediate threat to life, would cause irreversible adverse health effects, or would impair an individual's ability to escape from a dangerous atmosphere.” See https://www.osha.gov/pls/oshaweb/owadisp.show_document?p_table=STANDARDS&p_id=12716 (accessed July 8, 2015).

CSB • Interim Recommendations to DuPont La Porte, Texas 34

ventilation fans were in operation before continuing. DuPont employees do not follow a similar safety protocol.

  1. CSB interviews revealed that key DuPont technical personnel were not aware of basic details of

the building ventilation design, such as air flow direction. In addition, a technical operations supervisor was unaware of their responsibility for the operation of the “PSM Critical”67 ventilation equipment.

  1. Although DuPont mechanical integrity procedures call for annual air flow testing, the

manufacturing building ventilation system for the immediate area impacted by the methyl mercaptan release (the wet end fan) had never been tested for flow rate or effective distribution of dilution air. A 2009 audit of the DuPont La Porte’s PSM system found that the ventilation system was not being tested. The audit created an action item to fill this gap. All that was required to close the associated audit action item was to create a program that periodically generated a work order to conduct dilution air flow testing. The action item was closed in 2010 without this testing ever taking place. In 2012, it was identified that testing had not occurred. Because DuPont technical personnel did not understand the testing requirements, the ventilation system was not fully evaluated. Despite the 2009 audit finding, the flow rate and effective distribution of dilution air for the wet end fan was never tested. Moreover, only dilution air flow measurements for the dry end fan were taken, but there was no analysis—just measurements.

  1. The manufacturing building ventilation fans were classified as “PSM Critical” equipment by

DuPont. DuPont recognized that a ventilation fan breakdown could result in a high consequence event. However, neither the wet end fan nor the dry end fan was in operation at the time of the incident. Preliminary calculations indicate that even with both fans operating, ventilation as it existed would likely have been insufficient to reduce the lethal concentration of methyl mercaptan and prevent the death of the Shift Supervisor and Operator 1.

  1. Following a 1971 hazard review, DuPont installed alarms on the manufacturing building

ventilation fans so operations personnel would be notified if a ventilation fan stopped operating. DuPont also added a daily inspection to the operator checklist. While the daily inspection is still being performed, at the time of the November 15, 2014 incident there was no longer an alarm to notify operators that the fan was not running. CSB investigators learned that the alarm was eliminated in the mid-1990s when the facility upgraded the pneumatic panel board controls and installed a computer-based distributed control system (DCS). 68

  1. At the time of the incident, the manufacturing building ventilation fans for the portion of the unit

where the methyl mercaptan was released were not operating despite being classified as “PSM critical,” and despite being the subject of an “urgent” work order written nearly a month earlier, on October 20, 2014.

67 DuPont assigns the designation of PSM Critical to equipment whose failure could result in a high consequence event. 68 DuPont plans to provide an alarm to indicate when a ventilation fan is not operating prior to resuming insecticide manufacturing operations at the La Porte facility.

CSB • Interim Recommendations to DuPont La Porte, Texas 35

  1. DuPont La Porte procedures require that worker access to the building be “restricted” when any

of the ventilation fans are not in service (Figure 22). However, the breakdown of the ventilation fans did not result in any additional restrictions or safety precautions, such as extra personal protective equipment (PPE) requirements, worker access restrictions to the manufacturing building, or supplemental operational or emergency response protocols. The poor reliability of the fans had been normalized69 to the point where building access was no different with the fans running than with the fans off.

Figure 22. DuPont emergency procedures call for access to the building to be restricted if a ventilation fan is out of service. However, the actual practice for building access was no different with a fan out of service than if all the fans were operating.

  1. Analyzer houses in the MIC process area outside of the manufacturing building are equipped with

oxygen analyzers and lights that warn potential entrants if the internal atmosphere is low in oxygen concentration and not safe to enter (Figure 23). However, the manufacturing building has no similar oxygen atmosphere monitoring or warning system despite having significantly larger inventories of hazardous chemicals and unventilated areas.

Figure 23. Unlike the manufacturing building this DuPont analyzer house shown in the left photo is equipped with safeguards to ensure entrant safety. The oxygen analyzer shown in the right photo is inside the analyzer house continuously monitoring the analyzer house atmosphere. If a nitrogen leak occurs inside the analyzer house sufficient enough to cause the atmosphere inside to approach dangerous levels, an alarm sounds and the green light outside the door turns off to indicate it is not safe to enter. The manufacturing building lacks similar safeguards. The CSB has not been able to determine why DuPont applied more rigorous safeguards to the infrequently entered analyzer house than for the normally occupied manufacturing building.

69 Normalization of deviance is a long-term phenomenon in which individuals or work teams gradually accept a lower standard of performance until the lower standard becomes the norm. It is typically the result of conditions slowly changing and eroding over time. See Center for Chemical Process Safety (CCPS), “Recognizing Catastrophic Incident Warning Signs in the Process Industries.” 2012; pg 4.

CSB • Interim Recommendations to DuPont La Porte, Texas 36

manufacturing building are designed for fire escape. However, DuPont has not effectively evaluated entry or exit hazards for the stairways in a toxic or inert gas atmosphere.70 Furthermore, there is no ventilation provided in the stairway (north or south), and doors between the process and the stairways do not provide an effective barrier to keep the hazardous gases from entering the stairways.

external doors to the manufacturing building open,71 resulting in short circuiting of designed air flow patterns. As shown in Figure 24, the ventilation system at times is not even able to remove water vapor from the manufacturing building. The ventilation system performance with higher molecular weight gases such as chlorine and methyl mercaptan would likely be worse as these higher molecular weight gases need more dilution air velocity72 to sweep them up from the floor and into the exhaust air duct along the ceiling. Figure 24. Ineffective ventilation on the second floor of the manufacturing building. These photos document an operational activity taking place on January 9, 2015. Operations had directed a hot water hose on a flow meter on the north east side of the second floor as seen in the photo on the left. The photo on the right shows the steam nearly motionless (yellow circle) on the south east side of the building also on the second floor. Although the wet end fan was running at the time, an open door (Figure 25) provided a less restrictive path for air to enter the building and thus very little dilution air ventilation was taking place to sweep potentially hazardous gases out of the south east corner of the room. Note – these photos are snippets from a video recording. The video recording does a much better job of demonstrating the poor ventilation within the yellow circle.

70 Some portions of the manufacturing building can also be accessed by an elevator or with ladders. 71 Numerous unsealed piping penetrations into and out of the manufacturing building also result in large air gaps (openings) that adversely impact the dilution air flow design. 72 The higher molecular weight gases are heavier than air and would naturally descend to the ground.

CSB • Interim Recommendations to DuPont La Porte, Texas 37

Figure 25. Photo of the open door on the south side of the second floor adversely impacting the dilution air ventilation flow across process equipment described in Figure 24. Neither Workers nor the Public Are Protected by DuPont’s Toxic Gas Detection System

  1. DuPont’s methyl mercaptan technical standard states, “[a]utomatic or continuous specific

chemical detection systems must be installed where a [methyl mercaptan] release could have any off-site impact […] [Emphasis in the original].” The manufacturing building is equipped with gas detectors for methyl mercaptan73 in various locations. There are two methyl mercaptan detectors on the first floor and one on the fourth floor. All three of the methyl mercaptan detectors inside the manufacturing building are located on the east—wet end side. Despite being required by the technical standard, there were no methyl mercaptan detectors to identify a release on the third floor where the incident took place. Although the methyl mercaptan detectors alarmed at the time of the incident and during the days and hours preceding the incident, these detectors did not provide an effective safeguard to protect workers. The methyl mercaptan concentration in the building74 was only displayed on the DCS monitor and was not recorded by DuPont.

  1. DuPont’s methyl mercaptan gas detectors are intended to provide early warning of significant

leaks with potential off-site impacts and do not protect workers from exceeding short term exposure limits. The alarm point of the methyl mercaptan detectors (25 ppm) is set at the

73 DuPont uses a hydrogen sulfide (H2S) detector to identify methyl mercaptan leaks. DuPont records indicate that the manufacturer has stated the detector should be capable of detecting methyl mercaptan within 1 part per million (ppm). 74 DuPont’s detectors for methyl mercaptan are calibrated for 0-50 parts per million (ppm) using a hydrogen sulfide (H2S) calibration gas. The alarm for these detectors is set at 25 ppm.

CSB • Interim Recommendations to DuPont La Porte, Texas 38

Emergency Response Planning Guide (ERPG)75-2 level—significantly above the OSHA permissible exposure ceiling limit (10 ppm). In addition, OSHA has recognized that its exposure limits for methyl mercaptan are outdated and recommends using the more conservative NIOSH or Cal-OSHA exposure limit (0.5 ppm).76,77 DuPont’s toxic gas monitoring approach allows workers to be exposed to unacceptable hazardous concentrations of methyl mercaptan without an alarm ever going off.

  1. Although DuPont’s methyl mercaptan technical standard states, “[a]ll DuPont sites will protect

the site and neighboring businesses and communities from the escape of a highly toxic material[,]”methyl mercaptan detectors provided essentially no value to DuPont personnel or to the public (Emphasis in the original). DuPont operations staff became accustomed to the odor of methyl mercaptan being present in their work environment. The low odor threshold of methyl mercaptan resulted in a false sense of safety. Consequently, the workers did not associate detecting the odor of methyl mercaptan as representing an immediate hazard. Moreover, multiple DuPont employees informed the CSB that odor was the primary method used to locate a methyl mercaptan leak. DuPont personnel routinely responded to methyl mercaptan detector alarms without any additional respiratory protection. When they responded, if a significant leak was identified, these personnel consistently stated they would leave to get an SCBA and then return. On the night of the incident, multiple methyl mercaptan detector alarms activated, but because the workers were aware that methyl mercaptan was being released from their activities associated with clearing the hydrate, these alarms were normalized. No additional personal protective equipment, such as air-purifying respirators or SCBAs was used. In addition, DuPont did not order a unit evacuation and did not notify the ERT until hours later, after the operator made the distress call.

  1. DuPont highly toxic material standards require that toxic gas detection systems be treated the

same as safety interlocks.78 A January 2014 DuPont audit finding identified that appropriate safety actions were not taking place when highly toxic chemical gas detectors alarmed. The audit report stated, “[h]owever, during the last two events with high levels on area chlorine detectors no area or plant alarms were sounded, the ERT was not notified, and the area was not cleared of personnel.”79 Although the audit finding was closed in June 2014, the retraining sessions DuPont

75 The ERPG is further explained below in paragraph 57. ERPG-2: "The maximum airborne concentration below which it is believed that nearly all individuals could be exposed for up to one hour without experiencing or developing irreversible or other serious health effects or symptoms which could impair an individual's ability to take protective action." See https://www.aiha.org/get-involved/AIHAGuidelineFoundation/EmergencyResponsePlanningGuidelines/Documents/ERP- SOPs2006.pdf (accessed July 5, 2015). 76 OSHA recommends that employers consider using the alternative occupational exposure limits because the Agency believes that exposures above some of these alternative occupational exposure limits may be hazardous to workers, even when the exposure levels are in compliance with the relevant PELs. See https://www.osha.gov/dsg/annotated-pels/ (accessed June 15, 2015). 77 The Cal-OSHA permissible exposure limit (PEL) is an 8-hour time weighted average (TWA) of 0.5 ppm and the NIOSH recommended exposure limit (REL) is a 15-minute ceiling limit of 0.5 ppm. See https://www.osha.gov/dsg/annotated-pels/tablez- 1.html (accessed June 15, 2015). 78 DuPont defines a safety interlock as a system or function that detects an out-of-limits (abnormal) condition or improper sequence and brings it to a safe condition. 79 ERT is an acronym for the Emergency Response Team.

CSB • Interim Recommendations to DuPont La Porte, Texas 39 conducted were not sufficient to address the concern identified. As stated above, hours prior to the November 15, 2014 incident, multiple highly toxic chemical gas detectors alarmed (sounded). In addition, highly toxic methyl mercaptan releases on November 13 and 14, 2014, resulted in methyl mercaptan detector alarms, but these events were never reported as releases nor investigated as serious process safety incidents. Consequently, these gas detector systems were not treated the same as safety interlocks. Relief System Design Endangers Workers and the Public

  1. DuPont has been in the process of implementing a five-year program at La Porte to ensure

pressure relief systems conform to existing DuPont standards, process safety regulations, and industry codes and standards. DuPont has not made this program a sufficiently high priority, has limited internal resources, and has fallen far behind schedule. The program was initiated in 2011 with a 2015 completion goal. Although the program is more than four years into the five-year plan, IBU relief systems are only 35% complete. In addition, after conducting numerous employee interviews and reviewing many DuPont documents such as PHAs and relief system designs, the CSB has concluded that DuPont has not effectively evaluated relief valve scenarios and discharge location safety to ensure the community, workers, and the environment are protected from these process safety hazards.

CSB • Interim Recommendations to DuPont La Porte, Texas 40

Methyl Mercaptan Storage Tank Relief System

  1. In 2002, DuPont evaluated the potential to exceed off-site concentrations from a release of methyl

mercaptan through the relief valves on top of the 18,000 gallon methyl mercaptan storage tank shown in Figure 26. The American Industrial Hygiene Association (AIHA) publishes Emergency Response Planning Guide (ERPG) concentration values for single exposure to chemicals.80 ERPG values are a health-based guideline to aid in emergency planning. The three levels of ERPG are published in increasing level of consequence: ERPG-1; ERPG-2; and, ERPG-3.81 ERPG-3 is considered a worst-case planning level above which there is the possibility that some members of the community may develop life threatening health effects.82 The off-site concentrations that DuPont evaluated in 2002 were ERPG-3.

S23A Corporate Standard for Highly Toxic Materials requires mitigation of offsite MeSH [methyl mercaptan] release from fire.” DuPont’s evaluation found that in the event of a fire these relief valves could release 10,000 pounds per hour of methyl mercaptan and result in an off-site concentration that would exceed the ERPG-3 value of 100 ppm.83 To mitigate this risk to neighboring communities, DuPont invested over $17,000 to insulate the tank. A properly insulated tank can increase the time for a fire to heat the tank contents by reducing the heat input and causing less gas to be released from the relief system. DuPont documented the purpose and technical basis of this change stating, “[i]nsulating the tank would reduce offsite impact of RV [relief valve] discharge to acceptable concentration limits without need for more expensive mitigation options. We need to keep the relief rate below 4500 lb/hr [pounds per hour] to avoid ERPG-3 concentrations.” DuPont’s corporate standard for highly toxic materials states: Under all circumstances, potential discharges from pressure- relieving devices (e.g., those associated with transportation equipment used as long-term storage or connected storage or feed tanks) must be within acceptable concentration limits and of sufficiently short duration so that people off-site are not exposed to a dose that could result in either life-threatening (i.e., ERPG- 3) or irreversible (i.e., ERPG-2) health effects. 80 See https://www.aiha.org/get-involved/AIHAGuidelineFoundation/EmergencyResponsePlanningGuidelines/Documents/ERP- SOPs2006.pdf (accessed March 24, 2015). 81 The ERPG values for methyl mercaptan in parts per million (ppm) are: ERPG-1, 0.005; ERPG-2, 25; ERPG-3, 100. See https://www.aiha.org/get- involved/AIHAGuidelineFoundation/EmergencyResponsePlanningGuidelines/Documents/2014%20ERPG%20Values.pdf (accessed March 24, 2015). 82 “The values derived for ERPGs should not be expected to protect everyone but should be applicable to most individuals in the general population. In all populations there are hypersensitive individuals who will show adverse responses at exposure concentration below levels where most individuals normally would respond. Furthermore, since these values have been derived as planning and emergency response guidelines, not exposure guidelines, they do not contain the safety factors sometimes incorporated into exposure guidelines. Instead, they are estimates, by the committee, of the thresholds above which there would be an unacceptable likelihood of observing the defined effects.” Ibid at p 21. 83 “Once the distance from the release to the ERPG-3 level is known, the steps to mitigate the potential for such a release can be established.” Ibid at p 1.

CSB • Interim Recommendations to DuPont La Porte, Texas 41

  1. In addition, the American Petroleum Institute (API) publishes an industry standard on Pressure-

relieving and Depressuring Systems, API Standard 521 (API 521). When evaluating the atmospheric release of toxic chemicals from a relief device, API 521 states, “[c]oncentrations of toxic vapors, at the company property line, shall not exceed levels that cause life threatening health effects (e.g. ERPG-3 or equivalent).”84,85

  1. The American Society of Mechanical Engineers’ (ASME) Boiler and Pressure Vessel Code also

requires that relief valve discharge piping be routed “[…]to a safe place of discharge.”86

  1. However, the insulation on DuPont’s methyl mercaptan storage tank intended to limit the relief

rate and to protect the community from potential ERPG-3 concentrations was subsequently removed (Figure 26). DuPont lacks management of change or other documentation to indicate technical reasons or management approval for the removal of the insulation. In addition, the “more expensive mitigation options” referenced during the decision to insulate the tank, such as chemical treatment with a caustic scrubber, were not implemented.87 The CSB has been unable to determine when the insulation was removed, because DuPont lacks documentation and current DuPont personnel were unaware of the tank ever being insulated to mitigate toxic gas exposure to the public. Without the insulation on the methyl mercaptan storage tank, DuPont calculations indicate that the flow rate from the relief valve to atmosphere is approximately 10,000 pounds per hour—more than double the quantity DuPont determined could result in life threatening (ERPG- 3) concentrations within the neighboring community. As a result, workers and the public have been exposed to unacceptable risks. After the CSB identified this issue and communicated it to DuPont management, DuPont informed the CSB that the methyl mercaptan storage tank would be reinsulated.

  1. Although DuPont’s analysis indicates that insulation on the methyl mercaptan storage tank can

prevent highly toxic off-site ERPG-3 concentrations, DuPont’s internal corporate requirement is to prevent ERPG-2 concentrations. The CSB recommends (2015-01-I-TX-R1) that DuPont evaluate inherently safer design (ISD) options and effectively apply the hierarchy of controls such that neither workers nor the public is harmed from highly toxic chemical releases.

84 API Standard 521, Pressure-relieving and Depressuring Systems, Sixth Edition, January 2014. 85 This safety provision applies to users who apply a consequence-based approach. The API Standard 521 also allows a risk- based approach to establish appropriate acceptance criteria. 86 American Society of Mechanical Engineers (ASME), 2013. “Rules for Construction of Pressure Vessels,” ASME Boiler and Pressure Vessel Code, Section VIII, Division 1. UG-135 (f); pg. 100. 87 A 2005 document indicates that the insulation installed on the methyl mercaptan storage tank in 2002 resulted in corrosion to the methyl mercaptan storage tank and further implied that the insulation would be repaired. There was no indication that simply removing the insulation was an option.

CSB • Interim Recommendations to DuPont La Porte, Texas 42

Figure 26. Methyl mercaptan storage tank showing atmospheric relief valves (yellow circle). At present, the storage tank is not insulated and there does not appear to be any mitigation to prevent off-site ERPG-3 concentrations as required by American Petroleum Institute and DuPont standards.

CSB • Interim Recommendations to DuPont La Porte, Texas 43 Nitrogen Pressure Control Relief System

  1. Another example of relief valve discharge not currently being routed to a safe location is shown

in Figure 27. These nitrogen relief valves discharge directly under a pipe rack in close proximity to worker entry/exit points to the manufacturing building. Should these relief valves open, it is unlikely that the nitrogen would be sufficiently dispersed. Consequently, nitrogen discharge from these relief valves may result in an asphyxiation hazard to workers. DuPont engineering standards prohibit this design. For pressure relief discharge piping the engineering standard states: When discharging directly to the atmosphere‚ discharge shall not impinge on other piping or equipment and shall be directed away from platforms and other areas used by personnel.

Figure 27. Nitrogen relief valves near south entrance of the manufacturing building. Dispersion from these atmospheric nitrogen relief valves is obstructed by an overhead pipe rack. This obstruction could result in a dangerous atmosphere to workers as they enter or exit from the manufacturing building.

CSB • Interim Recommendations to DuPont La Porte, Texas 44

Caustic Scrubber Relief System

  1. On December 16, 2014, highly toxic chlorine was released from a caustic scrubber relief valve

(Figure 28 left photo) during an operation to vent and disconnect a chlorine railcar from the process. DuPont documentation indicates that the relief valve discharge piping is 10 feet above the work platform. This 10-foot value is used to help ensure relief valves discharge to a safe location.88 However, an evaluation of the relief valve in the field indicates that while this 10-foot vertical safety margin exists for the immediate work platform, there are several other adjacent work platforms above the relief valve discharge piping as shown in Figure 28 (right photo). As a result, these adjacent work platforms are not safe locations for workers because highly toxic gas could be discharged towards them. The design of the relief valve discharge location should be thoroughly evaluated for safety.

Figure 28. Caustic scrubber pressure relief device location. The photo on the left shows the relief valve within the yellow circle in the photo on the right. This caustic scrubber relief valve is located in a congested area on the north side of the manufacturing building. Although DuPont documentation indicates the discharge piping of this relief valve is 10 feet above the work platform, the analysis failed to consider the other work platforms above this relief valve that can clearly be seen (orange arrows) in the photo on the right. On December 16, 2014, this relief valve was the source of a highly toxic chlorine release when a DuPont operations activity vented chlorine to the caustic scrubber in order to disconnect and relocate a chlorine railcar.

88 The discharge from safety-relief valves shall be piped vertically upward to a point at least 10 feet above the ground. The discharge lines or pipes shall be adequately supported and protected against physical damage. See 29 CFR §1910.110(h)(4)(iii)(a)(2007).

CSB • Interim Recommendations to DuPont La Porte, Texas 45 Methyl Mercaptan Piping Relief System

  1. The methyl mercaptan pump that feeds the Lannate® process is equipped with relief valves

designed such that they could discharge highly toxic, highly flammable liquid directly to the ground in the immediate vicinity of where an operator would be located when starting the pump (Figure 29). In the 1990s, DuPont eliminated a similar set of relief valves for the API process pump. Despite it being immediately adjacent and similarly designed, the Lannate® methyl mercaptan pump’s relief valves remained. Furthermore, no PHA or engineering analysis has evaluated the Lannate® methyl mercaptan pump’s relief valve discharge location to ensure worker safety.

Figure 29. Liquid methyl mercaptan relief valve on the discharge of the methyl mercaptan pumps is designed to discharge this highly toxic, highly flammable chemical to grade just north of the methyl mercaptan storage tank.

CSB • Interim Recommendations to DuPont La Porte, Texas 46

Nitrogen to Methyl Mercaptan Railcar Unloading Relief System

  1. The design of the nitrogen relief valves at the railcar loading and unloading stations (Figure 30)

did not consider a scenario where the relief valves could be lined up to the discharge of the methyl mercaptan pumps, as they were at the time of the incident. The methyl mercaptan pump discharge pressure (90 psig)89 is higher than the set pressure (80 psig) of these nitrogen relief valves. Therefore, the methyl mercaptan pump will cause the relief valve to open and release the highly toxic and highly flammable chemical to the atmosphere. When tested post-incident, three of the four nitrogen rupture discs were ruptured and all four of the nitrogen relief valves leaked.90 Because the rupture discs and relief valves would not hold pressure when tested, an atmospheric release of highly toxic and highly flammable liquid methyl mercaptan likely occurred during the incident through this relief system that was intended to release and disburse nitrogen vapor. This relief system is part of the 35% of systems that DuPont considers complete and in compliance with industry codes and standards. However, the alignment of block valves at the time of the incident revealed a highly toxic methyl mercaptan release scenario that DuPont’s five-year relief system program never considered. Consequently, this program has not been fully effective.

Figure 30. This photograph shows the nitrogen relief valves at one of the two methyl mercaptan railcar unloading stations. The nitrogen relief systems for each of the two railcar unloading stations are nearly identical. DuPont PHAs and relief valve design documents never considered the possibility of the methyl mercaptan storage tank pumps being lined up to these relief valves – as it was at the time of the incident. As a result, liquid methyl mercaptan was discharged from a system designed for nitrogen vapor.

89 psig is an acronym for pounds per square inch gauge (pressure). 90 The relief valve repair shop was unable to achieve a successful “pop” test on these valves because the leak rate through the valve was too great to build up sufficient pressure to fully open the relief valve.

CSB • Interim Recommendations to DuPont La Porte, Texas 47 Process Hazard Analyses

  1. The manufacturing building ventilation system has never been evaluated by a process hazard

analysis (PHA). Prior to the incident, DuPont identified this shortcoming. However, DuPont’s pre-incident PHA schedule indicates that the initial PHA of the manufacturing building ventilation system would not occur until 2017. This ventilation system includes the “PSM Critical” fans that were not working at the time of the incident.

  1. Following the November 15, 2014 incident, DuPont completed two new baseline PHAs using a

more robust PHA methodology for the IBU.91 Despite performing PHAs for more than 30 years, DuPont employees told CSB investigators that the improved approach for conducting PHAs was resulting in hundreds of action items, never previously identified to control hazards. There are 13 additional PHAs to cover the full Insecticides Business Unit. DuPont has agreed to develop and implement a revised schedule to expedite the cyclical reviews for the remaining IBU PHAs. The final schedule will prioritize high-hazard processes. Some of these PHAs will be redone prior to restart. In addition, DuPont has retained a third-party consultant to review the existing IBU PHAs prior to restart.

91 The more robust PHA methodology applied was a Structured “What If” technique developed internally by DuPont. “The methodology incorporates the underlying principles of Hazard and Operability Analysis (HAZOP), failure mode and effect analysis (FMEA) "What if" and Checklist, but in a more user-friendly manner, with the intention to produce a result of equivalent or superior quality than any of these other methods applied alone.”

CSB • Interim Recommendations to DuPont La Porte, Texas 48

CSB Investigation Reports are formal, detailed reports on significant chemical accidents and include key findings, root causes, and safety recommendations. CSB Hazard Investigations are broader studies of significant chemical hazards. CSB Safety Bulletins are short, general-interest publications that provide new or noteworthy information on preventing chemical accidents. CSB Case Studies are short reports on specific accidents and include a discussion of relevant prevention practices. All reports may contain include safety recommendations when appropriate. CSB Investigation Digests are plain-language summaries of Investigation Reports.

The U.S. Chemical Safety and Hazard Investigation Board (CSB) is an independent Federal agency whose mission is to ensure the safety of workers, the public, and the environment by investigating and preventing chemical incidents. The CSB is a scientific investigative organization; it is not an enforcement or regulatory body. Established by the Clean Air Act Amendments of 1990, the CSB is responsible for determining the root and contributing causes of accidents, issuing safety recommendations, studying chemical safety issues, and evaluating the effectiveness of other government agencies involved in chemical safety. No part of the conclusions, findings, or recommendations of the CSB relating to any chemical accident may be admitted as evidence or used in any action or suit for damages. See 42 U.S.C. § 7412(r)(6)(G). The CSB makes public its actions and decisions through investigation reports, summary reports, safety bulletins, safety recommendations, case studies, incident digests, special technical publications, and statistical reviews. More information about the CSB is available at www.csb.gov. CSB publications can be downloaded at www.csb.gov or obtained by contacting: U.S. Chemical Safety and Hazard Investigation Board Office of Congressional, Public, and Board Affairs 1750 Pennsylvania Ave NW, Suite 910 Washington, DC 20006 (202) 261-7600

FD06477 | 2015_美国_Chevron_Richmond_炼油厂火灾-_Chevron_Richmond_Refinery_Fire__最终报告_2.pdf

分类:06_境外及港澳台调查报告 | 年份:2015 | 地域: | 严重程度: | 场所:化工/石化 | 起火原因: | 来源格式:pdf

(202) 234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. 1 U.S. CHEMICAL SAFETY BOARD

CHEVRON RICHMOND REFINERY FIRE

PUBLIC MEETING

WEDNESDAY, JANUARY 28, 2015

U.S. CHEMICAL SAFETY BOARD MEMBERS PRESENT: RAFAEL MOURE-ERASO, Ph.D., Chairperson, U.S. Chemical Safety Board MANNY EHRLICH, JR., Member, U.S. Chemical Safety Board MARK GRIFFON, Member, U.S. Chemical Safety Board STAFF PRESENT: RICHARD C. LOEB, General Counsel DON HOLMSTROM, Director, Western Regional Office DANIEL HOROWITZ, Managing Director of CSB ALSO PRESENT: CLYDE TROMBETTAS, Cal/OSHA BILL LINDSAY, City of Richmond RANDY SAWYER, Contra Costa County Health Department This transcript produced from audio provided by the U.S. Chemical Safety Board.

(202) 234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. 2 CONTENTS PAGE Welcome and Opening Statements by Chairperson Rafael Moure-Eraso. . . . . . 3 by Member Mark Griffon . . . . . . . . . . .13 by Member Manny Ehrlich. . . . . . . . . . .19 CSB Findings and Recommendations by Mr. Don Holmstrom, Director Western Regional Office. . . . . . . . . . .21 Board Questions Panel Presentations and Discussion by Mr. Clyde Trombettas, Cal/OSHA. . . . . .64 by Mr. Bill Lindsay, City of Richmond. . . .71 by Mr. Randy Sawyer, Contra Costa. . . . . .76 County Health Department Public Comment . . . . . . . . . . . . . . . . . .90 Board Vote on Final Report . . . . . . . . . . . 139 Closing Statements and Adjournment . . . . . . . 148

(202) 234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. 3 1 P R O C E E D I N G S 2 (6:30 p.m.) 3 CHAIRPERSON MOURE-ERASO: Good 4 afternoon, everybody. I think we are ready to 5 start. Good afternoon and welcome to this public 6 meeting of the US Chemical Safety Board, the CSB. 7 I am Rafael Moure-Eraso. I am the Chairperson of 8 the Board. 9 Joining me today is to my right, Board 10 Member Mark Griffon and to my left Board Member 11 Manny Ehrlich at the end of the table. Joining 12 us is the General Counsel of the CSB, Richard 13 Loeb. 14 With me also there's a number of CSB 15 staff members that I will be introducing and 16 whose efforts are the ones that permitted this 17 meeting to take place. They have facilitated to 18 put the meeting together. 19 As most of you know, the CSB is an 20 independent, non regulatory federal agency that 21 investigates major chemical accidents at fixed 22 facilities. That's what it says in our charter.

(202) 234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. 4 1 The investigations examine all aspects of 2 chemical accidents including physical causes 3 related to the equipment design as well as 4 inadequance in regulations industry standards and 5 systems, the safety management system of a given 6 location. 7 Ultimately we issue safety 8 recommendations which are specifically designed 9 to prevent similar accidents in the future in the 10 chemical sector where the accident occurred. The 11 purpose of today's meeting is for the CSB 12 investigative team to present the third and final 13 report into the 2012 fire and explosion at the 14 Chevron refinery right here in Richmond, 15 California concluding then this CSB 16 investigation. 17 As most of you know, 90 workers were 18 in danger by the explosion and fire and the 19 resulting large drifting black smoke generated 20 plume caused more then 15,000 residents of the 21 Richmond area to seek hospital treatment. The 22 CSB held two public meetings since 2012 on this

(202) 234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. 5 1 accident and released two investigation products. 2 Today's report is the third and final 3 installment of our investigation. The first 4 Chevron report, we call it the interim report and 5 you can read it on our website, discussed issues 6 of piping corrosion and how to prevent these 7 hazards. 8 It asked state and local authorities 9 to develop rules to encourage refineries to use 10 safer modern technologies. Our second report 11 reviewed the state and local regulatory system as 12 a whole. The Board approved this report in 13 November 2014, the second report. 14 It calls on the state to modernize its 15 regulatory system and to make sure that 16 refineries are truly reducing process risks and 17 not simply completely paperwork to meet 18 government requirements. To their great credit 19 the State of California, the Contra Costa County 20 and the City of Richmond have taken numerous 21 actions in response to the accident and the 22 recommendations of our reports.

(202) 234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. 6 1 We will hear more about these actions 2 later this evening during the panel discussion 3 that we are having. Recently for example, the 4 State of California Industrial Relations, 5 Department of Industrial Relations has drafted 6 extensive revisions to the rules concerning what 7 is called process safety management at 8 refineries. 9 The new regulations will require 10 employers to prevent and eliminate to the 11 greatest extent feasible health and safety risk 12 to employees. When adopted, the new process 13 safety rules together with the refinery 14 turnaround laws that the governor of California, 15 the legislators of California have just passed 16 will give California the strongest safety rules 17 for refineries in the country. 18 Today's final report has found some 19 recommendations that were not covered by the two 20 previous reports. These include analysis on the 21 Chevron organization. We look at their safety 22 culture and their emergency response

(202) 234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. 7 1 capabilities. 2 We also analyzed the industrial 3 standards for chemical leaks and the responses to 4 chemical leaks and we also looked at industrial 5 standards for mechanical integrity. We made 6 recommendations in the final report to the 7 American Petroleum Institute, to the American 8 Society of Mechanical Engineers, to the Contra 9 Costa County and to the Mayor and City Council of 10 Richmond. 11 I will, at this time to recognize some 12 important people from this region that have asked 13 to make a statement before us in these 14 proceedings. And at this time I would like to 15 recognize and invite Christopher Whitmore, which 16 is the Outreach Coordinator for Congressman, Mark 17 DeSaulnier from the office and he has a statement 18 to make. So, Mr. Whitmore, please. 19 MR. WHITMORE: Hello, good evening. 20 As he just stated my name is Christopher 21 Whitmore. I'm here representing Congressman Mark 22 DeSaulnier as his Outreach Coordinator for West

(202) 234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. 8 1 Contra Costa County. 2 Unfortunately, Congressman DeSaulnier 3 cannot be here this evening. However, I have a 4 statement that reads as follows. Having lived to 5 see my constituents die in refinery accidents it 6 is long past time to address preventable refinery 7 incidents once and for all. 8 As a Contra Costa County supervisor 9 after the Tosco tragedies resulting in the deaths 10 of five constituents, I helped to craft and 11 implement the Industrial Safety Ordinance, the 12 first of its kind nationally and with the 13 strongest safety standards in our country. I 14 support the Chemical Safety Board's investigative 15 efforts and findings regarding the August 2012 16 Richmond Chevron refinery fire. 17 I am deeply disappointed to see many 18 of the preventable issues found in the CSB's 19 latest report mirror those of earlier reports. 20 Among these findings, worker safety culture and 21 infrastructure upgrades must always be the 22 paramount priority.

(202) 234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. 9 1 Nineteen employees narrowly escaped 2 the most recent explosion and more than 15,000 3 community members required care related to the 4 explosion. This is unacceptable. However, 5 report findings and industries acknowledgment 6 that higher safety standards benefit all parties 7 provides new opportunities to move forward 8 jointly to improve safety standards. 9 Higher safety standards have 10 historically led to reduced incidents, higher 11 productivity, lower insurance rates for 12 refineries and better safety for workers and the 13 community. I continue to support CSB and 14 President Obama's push to implement more rigorous 15 standards that will improve the safety and 16 circumstances of workers, the community, the 17 environment and the economy. 18 Just as I authored the foremost local 19 Industrial Safety Ordinance, county and nation 20 wide as a member of the Workforce Protection 21 Subcommittee on the Congressional Education and 22 Workforce Committee, I want to thank the CSB for

(202) 234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. 10 1 coming back to Richmond. I hope that these 2 findings will instigate change to adopt and 3 mandate improved best practices at the national 4 level. 5 And I would just like to add before I 6 leave that if anyone here would like a copy of 7 the statement by Congressman DeSaulnier they will 8 be in the front entranceway of the chambers. So 9 thank you very much for your time. 10 (Applause) 11 CHAIRPERSON MOURE-ERASO: Thank you 12 very much, Mr. Whitmore. At this time I also 13 would like with respect to our work, our 14 investigative work in Chevron to take this 15 opportunity to thank the workers at Chevron and 16 the managers who readily and voluntarily 17 cooperated with the CSB investigation. 18 Their cooperation and their interest 19 in preventing major accidents is evident in the 20 report we are presenting tonight. I am also 21 pleased that the Chevron company, his comments 22 that were filed tonight in the press release has

(202) 234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. 11 1 expressed agreement with most of the CSB's 2 findings and recommendations. 3 At this time allow me to cover this 4 evening's agenda. First we're going to have the 5 opening statements, my opening statement and the 6 opening statements of the Board Members. Then 7 we're going to be followed by the Director of the 8 Western Regional Office that is going to present 9 the results of the third Chevron report and final 10 report. 11 Following Mr. Holmstrom's presentation 12 the Board will be given the opportunity to ask 13 some questions to the team that conducted the 14 investigation. Following that we will hear from 15 three panelists who will discuss the state and 16 local actions related to and following the 2012 17 incident. 18 Will be here, representatives from 19 Cal/OSHA, from Contra Costa County and from the 20 City of Richmond and I will be introducing to 21 them at that time in the agenda. The panel 22 portion of the presentation will be followed by

(202) 234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. 12 1 questions for the Board Members and the staff to 2 the panel. 3 Then we'll have short break and 4 following that short break we would like to hear 5 public comments. There is a yellow sheet that is 6 circulating around anybody that would like to 7 have to present a shared comment should come to 8 the front and provide their comments. 9 There is a lot of people that have 10 signed, I understand. And so in recognition and 11 respect for all the people that signed I will ask 12 you that you limit your comments to three 13 minutes. So after that part of the program we 14 are going to have a, after the public comment we 15 are going to have the vote on the report, the 16 official vote on the results of the report, on 17 the recommendations. 18 And that is going to be followed by 19 the discussion of other Board meetings and then 20 adjournment. Every safety meeting has to go 21 through this statement so I have to like to tell 22 you that, to give you some safety information

(202) 234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. 13 1 about this room. 2 Probably all of you know there are two 3 entrances in the back and you can have an exit 4 out of these doors in the case of an emergency. 5 So there are two and two there. So that is the 6 safety information if we need to evacuate the 7 room. 8 I hope that we don't need to. I'm 9 sure we probably won't have to, but there you go. 10 Please so take notice of the exits and I also 11 have to ask to please mute your cell phones so 12 that the proceedings might not be disturbed. 13 I now would like to recognize my 14 fellow Board Members for opening statements. 15 First I am going to ask Mr. Mark Griffon. 16 Please, Mark. 17 MR. GRIFFON: Thank you, Mr. Chairman. 18 I'm glad to be back in Richmond with our final 19 report. I look forward to the presentation by 20 the staff and I'm hopeful that the findings and 21 recommendations in the report will be helpful in 22 improving safety at the Chevron site as well as

(202) 234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. 14 1 other refineries in California and nationwide. 2 This investigation has in many ways 3 been a catalyst for a national dialogue on the 4 need for reform in process safety. Other 5 activities including the President's Executive 6 Order 13650 calling on OSHA and EPA to consider 7 whether process safety regulatory reform was 8 needed and the subsequent request for information 9 by OSHA and the EPA on the process safety 10 management and risk management planning 11 standards, have also been instrumental in 12 bringing attention to this issue at the national 13 level. 14 While this meeting is focused on our 15 third and final report on the August 2012 Chevron 16 incident, I want to take this opportunity to 17 discuss our second report, the regulatory report 18 which was approved, as the Chairman said, through 19 a written vote for the Board, of the Board on 20 November 5, 2014. 21 This report made recommendations for 22 improvements to the current process safety

(202) 234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. 15 1 management regulations in the State of 2 California, Contra Costa County and the City of 3 Richmond. Tonight we are going to hear from the 4 panelists from Cal/OSHA, Contra Costa County and 5 the City of Richmond about some of the progress 6 that's being made. 7 I look forward to hearing from this 8 panel. The report also discusses other 9 regulatory approaches in use around the world for 10 regulating high hazard facilities. I continue to 11 have great interest in the alternative approaches 12 as they may pertain to California or to the 13 national regulatory reform. 14 I hope these models will be further 15 examined as the need for improvements to OSHA's 16 PSM standard are being considered. In particular 17 I would like to draw your attention to Section 7 18 of the CSB Regulatory Report. In this section 19 titled Process Safety Management Reform at the 20 Federal Level, a Path Forward, the CSB commits to 21 holding a public hearing to discuss the need for 22 process safety management regulatory reform at

(202) 234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. 16 1 the federal level. 2 The meeting will be held in the spring 3 of this year and will include discussion of 4 various models for high hazard facility safety 5 regulation from around the US and the world, 6 including consideration of safety case type 7 models. Those participating in the hearing will 8 be asked to address some of the questions, 9 concerns and challenges to implementation that 10 were raised by the Board during the January 2014 11 meeting here in Richmond. 12 I urge you all to watch for this 13 meeting and if possible to participate. Let me 14 now turn to the final report which is the focus 15 of tonight's meeting. When this incident first 16 occurred many of us raised questions about 17 possible organizational failures that may have 18 contributed to the August 2012 incident. 19 I am glad that this report examines 20 some of these questions. As Congressman George 21 Miller said in his remarks in April 2013 Board 22 meeting, "Chevron has pointed to its operational

(202) 234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. 17 1 excellence program as the cornerstone of its 2 safety culture. It has found that on two key 3 principles, one", and he's quoting Chevron, do it 4 safety or not at all. 5 And the second one "there is always 6 time to do it right." What happened to these 7 principles? Congressman Miller went on to ask 8 how did the management of a highly sophisticated 9 corporation lack the ability to connect the 10 expertise of its physical material scientists 11 located right in Richmond with the practices of 12 it business units operating 300 yards away in its 13 refinery? 14 Was there an organizational failure? 15 Why was Chevron's inspection team's advice to 16 replace the piping overridden during the 2011 17 refinery turnaround? Was the decision not to 18 replace this piping driven by budget 19 considerations? 20 And I would just add to those why did 21 Chevron attempt to deal with a leak while the 22 unit was running rather than shutting down the

(202) 234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. 18 1 unit to do the necessary maintenance? How was 2 this decision made? 3 To me these are some of the most 4 important questions of this incident that needed 5 to be answered to understand how this incident 6 could have occurred. I look forward to hearing 7 from the staff tonight about these questions of 8 possible organizational failures and questions of 9 Chevron's safety culture. 10 I also look forward to gaining a 11 better understanding of the response to the leak 12 and eventual fire. Why wasn't the unit shut 13 down? Were emergency responders aware of the 14 hazards they faced? Why were so many people in 15 close proximity to the leak when the fire 16 started? 17 Was the notice to the community 18 effective? Was air monitoring adequate and are 19 the appropriate systems in place to provide the 20 community with the information about these 21 releases? 22 I hope the findings and

(202) 234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. 19 1 recommendations made in this final report are 2 useful in improving safety at the Richmond 3 facility and where applicable at refineries 4 nationwide and improved safety for the workers 5 and for the surrounding communities. Thank you 6 very much. 7 CHAIRPERSON MOURE-ERASO: Thank you, 8 Mr. Griffon. Mr. Ehrlich? 9 MR. EHRLICH: Mr. Chairman, thank you. 10 Good evening, ladies and gentlemen. Thank you 11 for having us out here. This is my first trip to 12 Richmond and obviously I wasn't in attendance at 13 the first two meetings or been involved in the 14 investigation to this point. 15 I think you'll find that the team that 16 did the investigation has done an outstanding job 17 and I think my role on this board is to be able 18 to take the lessons learned from an incident like 19 this, no matter how difficult they are, and help 20 apply them across the chemical industry so that 21 the same thing doesn't happen in other locations. 22 Thank you very much.

(202) 234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. 20 1 CHAIRPERSON MOURE-ERASO: Thank you, 2 Mr. Ehrlich. Moving with the agenda I would like 3 to introduce the Chemical Safety Board Managing 4 Director that is going to continue with the next 5 item of the agenda. Dr. Horowitz, please. 6 DR. HOROWITZ: Thank you, Mr. 7 Chairman. Tonight the CSB's Western Regional 8 Office Director, Donald Holmstrom will be 9 presenting the findings from the final 10 investigation report on the Chevron Richmond 11 refinery incident. 12 The CSB's Chevron investigation team, 13 which consists of Team Lead, Dan Tillema and 14 Investigators Lauren Grim, Amanda Johnson, Mark 15 Wingard and Steve Cutcheon would have liked to 16 have been here tonight to present their findings 17 but much of that team has unfortunately been 18 deployed to Texas since November to investigate 19 the serious toxic gas incident that resulted in 20 four fatalities at the DuPort La Porte facility 21 near Houston. 22 However, Don Holmstrom who is the

(202) 234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. 21 1 leader of that team will be presenting their 2 findings tonight and summarizing them for your 3 consideration and asking for your questions and 4 ultimately for your approval for the draft 5 report. 6 And Mr. Holmstrom is one of our most 7 experienced investigators, led the BP Texas City 8 investigation for the Board, clean energy 9 investigation, deep water investigation and many 10 others that have been recognized over the years. 11 So, Mr. Holmstrom, please proceed. 12 MR. HOLMSTROM: Thank you very much, 13 Daniel. I will be presenting the key findings 14 from our third and final investigation report on 15 the Chevron incident. These findings deal 16 primarily with organizational issues, industry 17 standards, emergency response. 18 I will begin the presentation by 19 sharing our key findings from the draft report 20 followed by our proposed recommendations. 21 Following the presentation the Board will have 22 the opportunity to ask questions regarding the

(202) 234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. 22 1 final draft report. 2 A panel of regulatory representatives 3 from Cal/OSHA, Contra Costa County and the City 4 of Richmond will then provide updates on their 5 organizations activities in response to the 6 Chevron incident. Following those statements 7 there will be an opportunity for members of the 8 public to speak. 9 Finally the Board will vote on 10 adopting the final report and the 11 recommendations. On August 6, 2012, the Chevron 12 refinery in Richmond, California experienced a 13 catastrophic pipe rupture of the 4-sidecut piping 14 in the crude unit. 15 The CSB determined that 19 Chevron 16 employees were engulfed in a vapor cloud formed 17 by the hydrocarbon release and narrowly escaped 18 serious injuries or death. In addition, 15,000 19 members of this community sought medical 20 treatment. 21 We found that the immediate cause of 22 this incident was sulfidation corrosion, a common

(202) 234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. 23 1 damage mechanism in refineries. To date the CSB 2 has released two investigation reports on this 3 incident. The first report released in April of 4 2013 assigned the need for California to require 5 inherently safer design, rigorous and documented 6 damage mechanism hazard reviews and thorough 7 analysis of the process safeguards. 8 In this report the CSB made 9 recommendations to Chevron, the City of Richmond, 10 Contra Costa County, the State of California and 11 the US Environmental Protection Agency. The 12 second report, CSB's regulatory report was 13 adopted in October of 2014 and discussed the 14 continuing trend of significant and deadly 15 incidents at petroleum refineries in the US 16 during the last decade. 17 In this report the CSB identified the 18 following shortcomings with process safety 19 regulations in both the US and California. The 20 CSB determined that neither the US or California 21 process safety regulations effectively 22 established goals to prevent incidents or reduce

(202) 234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. 24 1 risk. 2 The regulations are static, unable to 3 adopt innovation, newly defined hazards or 4 technical advances. They do not require the use 5 or implementation of inherently safer systems or 6 the hierarchy of controls. 7 Finally, they do not ensure continuous 8 process safety improvements. As a result, the 9 CSB made a recommendation to the State of 10 California to enhance and restructure its process 11 safety management regulations for petroleum 12 refineries with more robust risk reduction 13 requirements. 14 I will present our key findings and 15 recommendations in just a few minutes. Although 16 everyone here, no doubt, is familiar with the 17 sequence of events that led to the accident we 18 think it would be helpful to first play for your 19 our video animation depicting the Chevron 20 accident time line. 21 (Video animation) 22 On August 6, 2012, the crude unit was

(202) 234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. 25 1 operating normally. Around 3:50 that afternoon 2 an operator was performing a routine check when 3 he noticed a small puddle on the ground near the 4 distillation tower. The liquid appeared to be 5 dripping from an eight inch insulated pipe, 14 6 feet overhead. 7 The leaking pipe was a section of the 8 tower's number 4-sidecut line, which operated at 9 a temperature of 640 degrees Fahrenheit and 10 contained light gas oil, a combustible liquid 11 similar to diesel fuel. Chevron inspectors knew 12 that over the years the walls of the number 4- 13 sidecut had thinned due to corrosion. 14 But they did not realize how close 15 this particular segment was to failure. There 16 was no shut off valve between the pipe and the 17 distillation tower and no way to isolate the 18 leak. The head operator was called to the scene. 19 Although he believed the situation was 20 serious he did not believe the small leak 21 warranted immediately shutting down the unit and 22 stopping production. Following Chevron's

(202) 234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. 26 1 standard practice for responding to hazardous 2 leaks, refinery firefighters were sent to the 3 scene. 4 A number of managers, engineers and 5 technicians gathered there informally to assess 6 the problem. The group discussed a 7 recommendation from an operator to shut down the 8 unit. But they decided to first try to pin point 9 the leak by removing insulation from the pipe 10 while the crude unit was still running. 11 They hoped they could stop the leak 12 with a temporary metal fitting known as a clamp. 13 A Chevron firefighter tried using a pike pole to 14 hook and pull away the insulation. But this 15 poking action was deemed too dangerous because it 16 was moving the pipe. 17 The CSB later found that the tip of 18 the pike likely caused a small puncture in the 19 already thinned pipe. As the unit continued to 20 operate workers assembled scaffolding directly 21 beneath the leaking pipe. Two firefighters then 22 used a hook to remove the insulation from the

(202) 234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. 27 1 pipe. 2 As they were working, hydrocarbon 3 vapor began to flow out from underneath the 4 insulation. The two firefighters backed away 5 from the growing vapor cloud as the hot vapor 6 mixed with air it ignited. 7 That fire was quickly put out and the 8 two firefighters immediately climbed down off the 9 scaffolding. But the exact location of the leak 10 was still obscured by the remaining insulation 11 and firefighting water. 12 So the Chevron firefighters attempted 13 to strip the insulation off the pipe with high 14 pressure water. But the leak suddenly worsened 15 and hot hydrocarbon liquid started to spray out 16 of the pipe. 17 A decision was finally made to begin 18 an emergency shut down of the crude unit. But it 19 was too late. Suddenly the pipe ripped open. A 20 vapor cloud formed and rapidly expanded as the 21 large inventory of hydrocarbons in the 22 distillation tower started to vent through the

(202) 234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. 28 1 ruptured pipe. 2 The vapor cloud immediately spread 3 over hundreds of feet engulfing all 19 people who 4 had gathered nearby. The firefighters and 5 operators struggled to escape through the dense 6 hydrocarbon cloud unable to see. They had to 7 feel their way out, some on their hands and 8 knees. 9 At approximately 6:30 p.m., two 10 minutes after the huge vapor cloud formed, the 11 hydrocarbons ignited. One firefighter was 12 trapped inside a fire engine when it was suddenly 13 engulfed in flames. He radioed for help. 14 Mayday, mayday this is 460. 15 But when he received no response he 16 assumed everyone else was dead. To escape the 17 inferno he fled through what witnesses described 18 as a wall of fire. Fortunately, all the workers 19 would eventually flee to safety and there were no 20 fatalities. 21 MR. HOLMSTROM: As an introduction to 22 the key findings of the CSB's final investigation

(202) 234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. 29 1 report I'll briefly review the technical findings 2 presented in the CSB's April 2013 interim report. 3 The 4-sidecut piping that failed catastrophically 4 in this incident removed approximately 640 degree 5 light gas oil from the crude distillation tower 6 flowing on average at 10,800 barrels per day. 7 The crude distillation tower is part 8 of the initial refining process taking crude oil 9 and separating it into streams for blending and 10 intermediate feed stock for other refinery 11 processes to ultimately produce motor fuels, 12 lubricants and other products. 13 The rupture of the 4-sidecut piping 14 resulted in the wall of a 52 inch component of 15 this piping being extremely thin due to a damaged 16 mechanism known as sulfidation corrosion. 17 Sulfidation corrosion causes pipe walls to 18 gradually thin over time and is common in crude 19 oil distillation where naturally occurring sulfur 20 and sulfur compounds found in crude oil feed, 21 react with steel piping and equipment. 22 The Chevron refinery 4-sidecut piping

(202) 234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. 30 1 was constructed of carbon steel, which corrodes 2 at a much faster rate from sulfidation than other 3 typical alternative materials of construction 4 such as higher chromium containing steels. 5 These metallurgies are referred to as 6 inherently safer metallurgies because they reduce 7 the risk presented by sulfidation corrosion. 8 This animation shown here on the slide shows a 9 pipe cross section demonstrating how the 4- 10 sidecut piping wall material, shown in gray, 11 would corrode depending on the material of 12 construction. 13 You can see how the low silicon carbon 14 steel and regular carbon steel thins 15 significantly over a 15 year time period when 16 compared to inherently safer steels such as 9- 17 Chrome and stainless steel. A high ranking 18 technique to implement inherently safer design is 19 to replace metallurgy with an upgraded, 20 inherently safer material of construction. 21 I will now review three categories of 22 key findings from the final investigation report,

(202) 234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. 31 1 organizational and safety culture, emergency 2 response and industry codes and standards. The 3 full text of these findings as well as an 4 analysis related to this findings can be found in 5 a draft of the final investigation report that 6 has been on the CSB website since last Thursday 7 and I believe there's a number of reports that 8 have been available to the audience here as well. 9 First, organizational and safety 10 culture key findings. The CSB found that Chevron 11 did not effectively implement internal 12 recommendations to help prevent pipe failures due 13 to sulfidation corrosion. 14 In the ten year period prior to the 15 incident a small number of Chevron personnel with 16 knowledge and understanding of sulfidation 17 corrosion recommended on several occasions either 18 a one time inspection of every component within 19 the 4-sidecut piping circuit that failed known as 20 100 percent component inspection or an upgrade of 21 the material of construction of the 4-sidecut 22 piping.

(202) 234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. 32 1 The recommendations were not 2 implemented effectively and the 52 inch component 3 remained in service until it failed on August 6, 4

  1. The CSB found that both during the 2007

5 and 2011 turnarounds, Richmond Refinery's 6 Turnaround Planning Group in accordance with 7 Chevron's turnaround framing document criteria 8 rejected internal recommendations to perform 100 9 percent component inspections or replace the 10 portion of the piping that ultimately failed. 11 Either of these actions had the 12 potential to prevent the August 6, 2012, 13 incident. The CSB found that the decision making 14 that took place during the August 6th incident in 15 a similar 2010 incident suggests a culture that 16 normalized continued operation of a unit despite 17 a hazardous leak. 18 During response activities on August 19 6th, Chevron firefighters were instructed to 20 remove insulation on the piping while it was 21 leaking flammable hydrocarbons placing them in 22 harms way. A similar incident occurred in April

(202) 234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. 33 1 2010 when a pipe was found to be leaking on a 2 high temperature jet fuel process. 3 No timely action was taken to repair 4 the leak or shut down the unit and the pipe 5 remained in operation until the leak 6 significantly worsened two days later. Finally, 7 the unit was shut down and the leak was repaired. 8 Both incidents are examples of 9 decision making that encouraged and tolerated 10 continued operation of a refinery unit despite 11 the presence of a hazardous leak. The CSB found 12 that there has been an increased reluctance among 13 Chevron Richmond refinery employees to use their 14 stop work authority. 15 Safety culture surveys conducted of 16 Chevron Richmond refinery staff in 2008 and 2010, 17 showed there was a significant increase in this 18 reluctance among operators and mechanics. This 19 may explain why no individuals used their stop 20 work authority on the day of the incident despite 21 participants reporting and CSB interviews that 22 they were not comfortable with the hazardous

(202) 234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. 34 1 activity taking place. 2 In these same surveys, Chevron 3 Richmond refinery employees reported increased 4 concerns with how the refinery maintained its 5 equipment. Next I'm going to talk about the 6 emergency response key findings. 7 The CSB found that the Chevron 8 incident command structure did not effectively 9 identify potential damage mechanisms that could 10 have contributed to the 4-sidecut piping leak and 11 did not identify the potential for a catastrophic 12 rupture. The incident commands lack of knowledge 13 of all potential significant causes of the leak 14 led emergency responders to take actions that may 15 have ultimately exacerbated the leak. 16 Many Chevron personnel were thus put 17 in harms way. In addition, process conditions 18 were not effectively identified and communicated 19 to incident command on the day of the incident. 20 Several Chevron fire department personnel 21 responded to the leak, were erroneously informed 22 that the operating temperature of the leaking

(202) 234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. 35 1 piping was only 130 degrees Fahrenheit, more than 2 500 degrees cooler than the actual temperature. 3 The CSB also found that the leak 4 response and mitigation strategy developed on the 5 day of the incident involved stripping insulation 6 from the hot piping to identify the leak 7 location. Attempts to remove the insulation 8 actually worsened the leak ultimately resulting 9 in the pipe rupture and endangerment of the lives 10 of every one responding. 11 On the day of the incident Chevron had 12 no formal leak response protocol to provide 13 guidance for operations personnel, refinery 14 management, emergency responders or the incident 15 commander to determine how to evaluate a process 16 leak that had the potential for a catastrophic 17 failure, determine a safe hot zone and remove 18 unnecessary personnel from the area. 19 Chevron had no formal system to ensure 20 that the right people were gathering the 21 necessary information before deciding on leak 22 mitigation strategies. In response to this

(202) 234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. 36 1 incident, Chevron has improved its internal 2 policies by developing and implementing a leak 3 response protocol for determining how to assess 4 and mitigate leaks within the refinery. 5 The new protocol would require unit 6 shut down if a similar leak were to occur in the 7 Chevron refinery. Finally, industry codes and 8 standards key findings. The CSB found that the 9 American Petroleum Institute Recommended Practice 10 939-C, Guidelines for Avoiding Sulfidation 11 Corrosion Failures in Oil Refineries does not 12 require comprehensive inspection or effective 13 facility upgrades. 14 API 939-C is a primary industry 15 guidance document on methods to monitor and 16 control sulfidation corrosion. It states that 17 carbon steel piping, if it contains low silicon 18 concentrations, can corrode due to sulfidation at 19 a faster rate than adjacent higher silicon piping 20 components. 21 However, API 939-C does not 22 specifically require users to either perform a

(202) 234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. 37 1 100 percent component inspection for low silicon 2 components or recommend the facilities upgrade 3 their high risk carbon steel circuits to steel 4 alloys that are more resistant to sulfidation 5 corrosion. 6 The CSB found that industry codes and 7 standards present inconsistent information about 8 carbon steel piping susceptible to sulfidation 9 corrosion. API has published various codes and 10 recommended practices, in addition to API 939-C, 11 that discuss sulfidation corrosion. 12 These include: API 570, Piping 13 Inspection Code, Inservice Inspection, Rating and 14 Repair; API 571, Damage Mechanisms Affecting 15 Fixed Equipment in the Refining Industry; API 16 574, Inspection Practices for Piping Component 17 Systems and API 578, Material Verification 18 Program for New and Existing Alloy Piping 19 Systems. 20 While these documents provide some 21 information on sulfidation corrosion, the 22 information and guidance is varied and

(202) 234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. 38 1 inconsistent. The CSB has also determined that 2 the language of these standards is written with 3 permissive language with no minimum requirements. 4 Finally, the CSB found that industry 5 guidance in responding to process leaks do not 6 present adequate or consistent information about 7 responding to these process leak incidents. API 8 and the American Society of Mechanical Engineers 9 have published several codes, standards and 10 recommended practices that provide information on 11 how to safely control, mitigate or respond to 12 hazardous process fluid leaks. 13 However, the guidance is permissive 14 and inconsistent failing to require safety 15 evaluation of leaks, the determination of the 16 toxicity of the leak or the worst case scenario 17 of the leak despite its potential to be 18 catastrophic. 19 And finally, the guidance does not 20 require limiting the site access around the leak 21 to essential personnel only or shut down the unit 22 which can put employees in harms way. Based on

(202) 234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. 39 1 our findings and analysis, the investigation team 2 proposed to the Board the following 3 recommendations. 4 I will be hitting on the highlights of 5 these recommendations and the full wording of 6 each recommendation will be on the screen. 7 First, to the American Petroleum Institute is the 8 first set of recommendations seeking to 9 strengthen industry standards relating to 10 sulfidation corrosion. 11 The CSB proposes Recommendations 23 to 12 revise API 939-C, Guidelines for Avoiding 13 Sulfidation Corrosion Failures in Oil Refineries 14 to establish minimum requirements for preventing 15 catastrophic rupture of low silicon carbon steel 16 piping. 17 The next recommendation, the CSB 18 proposes Recommendation 24 to revise API 571, 19 Damage Mechanisms Affecting Fixed Equipment in 20 the Refining Industry to increase awareness of 21 sulfidation corrosion characteristics and refer 22 users to the specific API standards that provide

(202) 234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. 40 1 important information to prevent catastrophic 2 rupture of low silicon carbon steel piping. 3 The CSB proposes Recommendation 28 to 4 revise API RP 2001, Fire Protection in Refineries 5 to require users to develop a process fluid leak 6 response protocol specific to their own facility 7 that must be followed when a process leak is 8 discovered. The CSB proposes that users 9 incorporate key actions into their leak response 10 protocol to effectively manage response to 11 potential sulfidation corrosion piping failure. 12 The CSB proposes Recommendation 25 to 13 API 570, Piping Inspection Code to incorporate 14 language consistent with API 939-C, increase 15 awareness of sulfidation corrosion 16 characteristics, provide additional information 17 to prevent catastrophic rupture of low silicon 18 carbon steel piping and require users to follow 19 the proposed leak response guidance in API 2001 20 Fire Protection in Refineries. 21 The CSB proposes Recommendation 26 to 22 revise API 578, Material Verification Program for

(202) 234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. 41 1 New and Existing Alloy Piping Systems, to require 2 users to establish and implement a program to 3 identify carbon steel piping circuits that are 4 susceptible to sulfidation corrosion and may 5 contain low silicon components. 6 The CSB proposes Recommendation 27 to 7 revise API 574, Inspection Practices for Piping 8 System Components to incorporate as a normative 9 reference API 939-C and to follow the leak 10 response protocol requirements established in API 11 2001 Fire Protection in Refineries. 12 The CSB makes the next proposed 13 recommendation to the American Society of 14 Mechanical Engineers or ASME. The CSB proposes 15 Recommendation 29 to revise ASME PCC2-2011, 16 Repair of Pressure Equipment and Piping to 17 require users to follow the minimum process fluid 18 leak response requirements established in API 19 2001 Fire Protection in Refineries, developed in 20 response to Recommendation 28, before conducting 21 process fluid leak repairs. 22 The CSB makes the following proposed

(202) 234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. 42 1 recommendations to the Chevron Corporation. The 2 CSB proposes Recommendation 30 to Chevron to 3 develop an accountability method to identify and 4 track effective implementation of the Chevron or 5 industry best practices to ensure process safety 6 or employee personal safety. 7 The CSB proposes Recommendation 31 to 8 develop an audible process for all recommended 9 turnaround items related to inspection or 10 mechanical integrity recommendations that are 11 denied or deferred. This process shall provide 12 the submitter of the deferred or denied 13 recommendation with a mechanism to further 14 elevate and discuss the recommendation with 15 higher management officials. 16 The CSB proposes Recommendation 32 to 17 Chevron to develop an approval process that 18 includes a technical review that must be 19 implemented prior to resetting the minimum alert 20 thickness to a lower value in the inspection 21 database. 22 The final two proposed recommendations

(202) 234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. 43 1 nearly identical are made to the Board of 2 Supervisors, Contra Costa County, California and 3 to the Mayor and City Council of Richmond, 4 California with the goal of continuously 5 improving process safety culture at petroleum 6 refineries in Contra Costa County. 7 To the Board of Supervisors, Contra 8 Costa County, California and the Mayor and City 9 Council City of Richmond, California, revise the 10 Industrial Safety Ordinance, ISO regulations for 11 petroleum refineries to require the development 12 of an oversight committee comprised of the 13 regulator, the company, the workforce and their 14 representatives and community representatives. 15 Among the duties of this committee 16 shall be to oversee development and 17 implementation of action items created as the 18 result of safety culture assessment findings. 19 That concludes my presentation on the CSB's final 20 investigation report on the Chevron Richmond 21 incident. 22 I will now open it up to the Board to

(202) 234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. 44 1 ask any questions on the draft report and 2 proposed recommendations. Thank you, Chairman 3 Moure-Eraso and Board and Daniel. 4 CHAIRPERSON MOURE-ERASO: Thank you 5 very much, Mr. Holstrom. Let me get started with 6 one question that I would like to direct to you 7 and to the team, you are speaking for the team. 8 In two of the reports that covered the 9 Chevron incident, especially in the first one and 10 in this one, in this third one, the investigators 11 report they need to look at inherently safer 12 technologies to prevent these accidents from 13 happening. And there is some reference of course 14 to the type of metal of the piping. 15 But also there is some mentioning on 16 the content of sulfur that could, is directly in 17 the crude, in the feeding stock that eventually 18 is the root of the corrosion. So my question to 19 you is, do you consider that the content of 20 sulfur and they tried to decrease the content of 21 sulfur in the feed stock could be considered also 22 an inherently safer technology to prevent this

(202) 234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. 45 1 type of corrosion that we experienced here? 2 MR. HOLMSTROM: Chairman Moure-Eraso, 3 the CSB in its reports has dealt with this issue 4 not only in the Chevron investigation but in a 5 prior investigation in the same county, Contra 6 Costa County in the Tosco investigation. 7 And the incident occurred in 1999 8 where there was a piping failure and a leak and 9 many of the similar issues that we're discussing 10 today, including stop work authority issues and 11 issues related to corrosion management and 12 importance of doing management of change analysis 13 in dealing with any change in the composition of 14 the feed stock. 15 In that Tosco investigation the CSB 16 pointed out a good industry practice including 17 API 750 that would require the conduct of a 18 management to change analysis if there was 19 changes in feed stock that could impact corrosion 20 in the refinery process, also if there were 21 changes in throughput or other changes such as 22 temperature, composition of corrosion products,

(202) 234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. 46 1 et cetera, we cited that, the importance of 2 conducting that type of analysis prior to the 3 implementation of a change. 4 And that's certainly an important part 5 of any management of change process is that 6 analysis takes place before any process changes 7 occur. In our first report, in the interim 8 report of Chevron, we in fact made 9 recommendations to California, Contra Costa 10 County and the City of Richmond addressing the 11 importance of performing inherently safer systems 12 analysis to analyze the opportunities for 13 implementing inherent safety, which includes 14 improved materials of construction that could be 15 triggered by the increase in sulfur content. 16 It could be triggered by other factors 17 that we noted in our report. We noted in our 18 report that Chevron had in fact removed a 19 stripper that was part of the process that 20 increased the sulfur content of the feed related 21 to the piping and impacted the piping in 22 question.

(202) 234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. 47 1 We noted that the temperature had 2 increased over time. We also noted the content 3 of sulfur had increased over time. All of those 4 factors should have led Chevron to conduct some 5 sort of management of change review and 6 implemented in that process an inherently safer 7 systems analysis. 8 So we included in our recommendation 9 to, I believe it was R7, to 678, to several 10 parties that inherently safer systems analysis be 11 performed prior to the change and include a 12 review of the factors I just mentioned and that 13 it be triggered by things like construction of 14 new process, process unit rebuilds, significant 15 process repairs, and the development of 16 corrective actions from incident investigations. 17 So that was intended to be conducted, 18 that type of analysis, in the conduct of a 19 management of change. So if there is a change in 20 sulfur content, if the type of crude is 21 different, if there is more hydrogen sulfide in 22 the crude because of change in equipment, if the

(202) 234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. 48 1 temperature of the crude changes these are 2 factors that all can effect sulfidation 3 corrosion. 4 Increased throughput, increased flow, 5 those are things that should trigger some sort of 6 management change analysis that should rigorously 7 look at the alternatives for implementing some 8 sort of inherently safer systems analysis. 9 CHAIRPERSON MOURE-ERASO: Thank you, 10 Mr. Holmstrom. Now I would like to ask Board 11 Member, Manny Ehrlich, if he has some comments or 12 questions. 13 MR. EHRLICH: Thank you, Mr. Chairman. 14 I really have more of a comment than a question. 15 And this comment comes from the fact that I have 16 about 25 years of experience in the private 17 sector in emergency response. 18 But you mentioned in the report that 19 a number of individuals were concerned about 20 using the stop work procedure during this 21 emergency. And you also mentioned that the 22 incident command structure didn't appear to be

(202) 234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. 49 1 fully developed. 2 Had it been fully developed there 3 would have been another mechanism in the command 4 structure where the safety officer has 5 responsibility for terminating an operation in 6 the event of an emergency and in the event that 7 the coworkers or the workers feel that they are 8 at unacceptable risk. 9 And had that happened it may not have 10 done very much to stop the leak, obviously. But 11 what it would have done is it would have caused 12 all of the personnel to be evacuated from the 13 area and not involved in this type of disaster. 14 Thank you. 15 CHAIRPERSON MOURE-ERASO: Thank you, 16 Mr. Ehrlich. Mr. Griffon. 17 MR. GRIFFON: Thank you, Mr. Chairman. 18 Yes, I have a few questions for the team, the 19 team of one. First of all does Chevron have a 20 poor safety culture? 21 MR. HOLMSTROM: Mark, I think the way 22 we approach this is to identify specific

(202) 234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. 50 1 opportunities for improvement in the safety 2 culture at the Chevron refinery and I think that 3 some of those specific opportunities that we 4 identify in the report we had touched on them in 5 our presentation. 6 And to go, if I may, a little more 7 deeply into some of those items. We talked about 8 what we call normalization of deviance. And we 9 noted that there was at least a couple of other 10 incidents that involved deciding to continue to 11 operate the plant even though there was a 12 hazardous leak that was present. 13 And the decision making about whether 14 or not to shut down a unit or keep things running 15 is a very fundamental decision and involves 16 management accountability. In the first volume 17 of the Center for Chemical Process Safety, CCPS, 18 they wrote on technical aspects of process 19 safety. 20 Their first element was management 21 accountability and it talked very specifically 22 about the importance of dealing with the tension

(202) 234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. 51 1 between production and safety and that management 2 has to exercise important oversight over, putting 3 safety above continuity of operations and making 4 sure there is protection of people. 5 And so what we found in the safety 6 culture surveys is there was concern about 7 utilizing stop work authority. We go into a 8 discussion about stop work authority 9 historically. 10 And again, this is an issue that the 11 CSB has quite a bit of experience with. It goes, 12 one of the cases it goes back again to the Tosco 13 in the 1999 Tosco incident where we specifically 14 identified the importance of having that ability 15 to stop work and some of the things that inhibit 16 that ability to exercise stop work authority. 17 For example, the power relationship 18 between management and workers and often the, 19 exercising the ability of stop work is to take a 20 position that's different than management. And 21 so an environment has to be created that 22 encourages stop work authority and there are

(202) 234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. 52 1 strong provisions that allow it to take place and 2 where workers can exercise it without fear of any 3 kind of retribution or consequences. 4 And those are things that we pointed 5 out in that report way back in 1999 and I think 6 those are factors that are currently at play in 7 this, in our analysis of this incident. The two 8 other things we mentioned, and again looking at 9 the safety culture surveys from 2008, 2010 and 10 the current incident, were the issues of concerns 11 about fixing things, mechanical integrity, 12 repairs being conducted. 13 And one of the things that we cited 14 that managers and engineers had a declining, from 15 2008 to 2010, confidence of, that anyone had, you 16 know, the ability to stop unsafe activity and 17 also the plant as a whole had, you know, also 18 concerns in those surveys about, you know, things 19 being repaired. 20 There were similar findings in the 21 report about process safety issues being 22 completed, like incident investigations and

(202) 234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. 53 1 lessons learned being implemented. And so for us 2 those were concrete, in addition to our 3 interviews out of the 2012 incident, those were 4 additional survey results where additional 5 findings we thought were important. 6 MR. GRIFFON: And just to follow up on 7 that, I think I know the answer to this, but the 8 focus was mainly on the Richmond refinery? You 9 didn't look at Chevron corporate wide? 10 MR. HOLMSTROM: No, we did not. I 11 mean one example of how the CSB has looked at the 12 corporation from one of our recommendations, the 13 CSB recommended in the BP Texas City incident to 14 form what was called the James Baker III Safety 15 Culture Review which led to the Baker report, 16 which looked at all the BP refineries in the 17 United States and had a number of very 18 significant findings on how to improve process 19 safety culture in the refining sector. 20 We did not do that kind of analysis 21 where we looked at a number of Chevron 22 refineries. But I would note that a number of

(202) 234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. 54 1 the specific organizational findings that we 2 talked about in this report also involved 3 programs from Chevron corporate, the (inaudible) 4 and some of the other issues that we discussed 5 where the plant had been notified about the 6 failure to implement the ETC recommendations on 7 sulfidation corrosion including 100 percent 8 component inspection or upgrading the metallurgy. 9 Those issues had not been implemented 10 and they involved the corporate groups 11 interacting with the plant personnel. 12 MR. GRIFFON: And let me just follow 13 up on the organizational failure which you 14 started to talk to there. I mean the report 15 detailed how various committees and work groups 16 were making recommendations regarding inspections 17 or the need for pipe replacement that were 18 basically ignored. 19 Can you tell me why these 20 recommendations were rejected? What was the 21 basis for the recommendations being rejected and 22 was cost a driving, a driver of this decision

(202) 234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. 55 1 making? 2 MR. HOLMSTROM: Well I think that 3 it's, one thing that's an overriding fact is that 4 any refinery needs to put a high, the highest 5 priority on safety but that cost is always an 6 issue. That's certainly true. 7 Our specific findings delve more with 8 how those decisions were made, how they were 9 played out organizationally. And I think the 10 fundamental issues that we identified, Board 11 Member Griffon, related to the importance of 12 having oversight and accountability by higher 13 level managers at the plant to ensure that the 14 right decisions were being made. 15 Ironically, in the turnaround framing 16 documents a number of these decisions were being 17 rejected based on what was perceived to be lack 18 of data or data driven decisions when in fact the 19 good practice guidelines from industry and 20 Chevron's own technical center findings and 21 recommendations were to gather more data. 22 So the decisions were being made there

(202) 234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. 56 1 wasn't enough data when in fact the actual 2 decision was to gather more data so that a 3 correct decision could be made about the extent 4 of sulfidation corrosion and the extent of 5 potential piping circuits that had low silicon 6 components and those could have been identified. 7 So that was actually an initiative to 8 gather more data, but based on the limited, 9 incomplete data that they had they were rejecting 10 those recommendations. 11 MR. GRIFFON: And you may have touched 12 on this in your response there. But this framing 13 document I'm interest in basically is, includes 14 the criteria by which the turnaround group makes 15 their determinations on what can be done during 16 the turnarounds versus what could be done on the 17 run, I guess for running maintenance as some 18 would refer to it. 19 And I'm wondering just, you mentioned 20 some of the problems with that. But I'm 21 wondering how is that criteria initially 22 established or how is it modified and who is

(202) 234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. 57 1 involved in sort of setting or establishing that 2 criteria because it seems like that's a big 3 factor in this whole thing is who makes those 4 rules on what can be done while running versus 5 what can be done, has to be done during a 6 turnaround. 7 MR. HOLMSTROM: Certainly. I think we 8 identified that as a safety culture issue first 9 and foremost. But I think we went further and 10 identified that it's very important when people, 11 rather than people making decisions based on the 12 pressures of the moment, there's often a lot of 13 stress when these leaks are occurring there's an 14 emergency response activity, that it's very 15 important for a company to have an existing 16 protocol. 17 And one of the things that Chevron did 18 do in the wake of this incident was develop a 19 leak response protocol which in fact has about a 20 half a dozen questions that it asks that lead 21 directly to making a decision to shut down the 22 unit, which includes what do we know about the

(202) 234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. 58 1 damage mechanisms. If you don't know whenever 2 you have a doubt you should shut down the unit. 3 That's what the current protocol 4 provides for and as we say in the report we think 5 that's an important step forward and we think 6 that there's additional items that we talk about 7 including in that process and we make a 8 recommendation for industry as a whole to develop 9 a leak response protocol that would address the 10 important decision of directly making, setting 11 forth criteria to be able to decide when to shut 12 down a process unit and make that based on a 13 criteria that are developed in the calm 14 atmosphere of planning and process review as 15 opposed to making decisions in an emergency that 16 don't have the benefit of that thinking. 17 And one of the most important things 18 is to have the right technical information in 19 front of you and have those, that technical 20 expertise available so that you can assess the 21 full scope of the potential catastrophic impact 22 of a potential leak. There's several types of

(202) 234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. 59 1 damage mechanisms in refinery processes that 2 could lead to sooner than later a catastrophic 3 failure and sulfidation corrosion is one of 4 those. 5 And if that information had been 6 available to those who were making the decision, 7 we believe that it would likely have led to the 8 decision to shut down the unit much more quickly. 9 In fact, the same circuit that was 12 10 inches in diameter, it was subject to the same 11 process feed, it was subject to the same 12 material, was replaced in the 2011 turnaround. 13 And these facts as they accumulate are pretty 14 overwhelming evidence that sulfidation corrosion 15 should have been considered and brought to the 16 attention of the incident commander and others so 17 that correct decisions could have been made to 18 limit the nonessential people in the area, create 19 a much larger hot zone. 20 You know, while these are insights 21 that are gained, you know, from, you know, after 22 the incidents, it's important that these lessons

(202) 234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. 60 1 be spread throughout the industry. So we've made 2 a recommendation to API in their Firefighting 3 Refinery Recommended Practice 2001 to incorporate 4 these process leak protocols in that approach. 5 MR. GRIFFON: And last question, I 6 promise. In the report Figure 25 I think is very 7 informative. It has a, it shows a, for lack of a 8 better term, a spaghetti diagram of all the 9 various committees and work groups that were 10 making these recommendations and where they 11 reported to in the organizational chart. 12 And it's, well I'll just ask, it seems 13 to me that a lot of these were made at the lower 14 or middle level and was plant management aware or 15 notified of these technical recommendations and, 16 you know, do we think that's a flaw in their 17 system? 18 MR. HOLMSTROM: I think in a couple of 19 the examples that we give in the report there 20 were plant managers that were involved in that 21 decision making. But for the most part a lot of 22 the folks involved were at lower levels of the

(202) 234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. 61 1 organization. 2 I think the point we're making is 3 somebody at a higher level on the organization 4 has to have oversight and accountability for 5 making these decisions and be held accountable to 6 make sure, for example, that the ETC Guidelines 7 on sulfidation corrosion which could have helped 8 prevent this incident, are implemented in the 9 refinery and not rejected, for example, in the 10 turnaround framing document meetings where items 11 are being rejected from being worked on during a 12 turnaround. 13 We think that somebody has to have 14 overall accountability and oversight over that 15 process and we make recommendations to Chevron to 16 make sure that occurs. 17 MR. GRIFFON: And just the last follow 18 up in regard to that. The organizational, the 19 detailed organizational chart that I, that we 20 have in our files has a PSM/OE unit in the 21 organization. And I'm pretty sure I'm right 22 about this.

(202) 234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. 62 1 But I think none of the PSM people 2 were really involved on any of these referring or 3 recommending committees, although they obviously 4 had, you know, very talented technical people, 5 metallurgists, et cetera. I'm wondering if the 6 PSM group should have been integrated in this 7 process somehow and well I'll leave it at that. 8 MR. HOLMSTROM: Do you want me to 9 respond? 10 MR. GRIFFON: Yes. Should they have 11 been, yes? 12 MR. HOLMSTROM: I mean arguably 13 mechanical integrity is an element of PSM and 14 folks who have that technical expertise. 15 Certainly there should be people, we believe, 16 that would include the management oversight 17 element who make sure that those voices are being 18 heard. 19 And we previously recommended in the 20 BP Texas City report that process safety have a 21 direct voice to the higher level, not only 22 managers in a facility, but to the higher level

(202) 234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. 63 1 corporate officials so that process safety advice 2 and process safety thinking does not, is not only 3 interjected at a low level in the organization 4 but becomes one of the most important voices in 5 decision making throughout the organization. 6 MR. GRIFFON: Thank you, Mr. Chairman. 7 Thank you, Mr. Holmstrom. 8 CHAIRPERSON MOURE-ERASO: We'll 9 continue immediately with the agenda. I would 10 like to call for, we call it a Regulatory Panel 11 that is going to discuss the actions that have 12 been taken in response to this particular 13 incident. 14 I would like to invite to this desk 15 over here, Mr. Clyde Trombettas, the District 16 Manager of Cal/OSHA for the Process Safety 17 Management Unit. You have to look out for your 18 name from there and sit behind that. 19 All right. I would like to invite 20 Randy Sawyer, the Director of Hazardous Materials 21 Program of the Contra Costa County, Randy. And 22 also Mr. Bill Lindsay, the City Manager for the

(202) 234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. 64 1 City of Richmond, California. 2 So I believe you have statements. I 3 will start with Mr. Trombettas, please. 4 MR. TROMBETTAS: Thank you. Honorable 5 Moure-Eraso, Board Members and staff, thank you 6 for the opportunity to participate in this public 7 meeting addressing the Chemical Safety Board's 8 final report on the Chevron fire of August 6, 9 2012. 10 My name is Clyde Trombettas. I'm the 11 district manager for Cal/OSHA's statewide Process 12 Safety Management Unit. Following a serious fire 13 at the Chevron Richmond refinery on August 6, 14 2012, Governor Brown formed an interagency 15 working group to examine ways to improve public 16 and worker safety through enhanced oversight of 17 refineries. 18 The report by the governor's 19 interagency working group on refinery safety 20 issued in February 2014 raised concerns about the 21 safety of the state's petroleum refineries. 22 The report called for the

(202) 234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. 65 1 establishment of an interagency refinery task 2 force to include but not limited to, coordinate 3 revisions to the state's refinery safety 4 regulations, known as process safety management 5 and the California Accidental Release Program or 6 CALARP regulations, strengthen regulatory 7 enforcement and improve coordination between 8 refineries. 9 In 2014, DIR convened and participated 10 in over 20 stakeholder meetings with the 11 petroleum refinery industry pertaining to process 12 safety, refinery workers, community based 13 organizations and the public. At each of these 14 meetings DIR presented the findings, the 15 recommendations of the governor's report and 16 described DIR's proposed revisions to the PSM 17 standard to refineries for discussion and 18 feedback. 19 Three of these meetings consisted of 20 DIR's PSM Advisory Committee made up of invited 21 representatives from labor and industry. All 22 Advisory Committee meetings were open to members

(202) 234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. 66 1 of the public. 2 Proposed changes to the PSM standard 3 include but not limited to the following. One, 4 hierarchy of hazard controls. Two, safety 5 culture assessments. Three, damage mechanism 6 hazard reviews. Four, root cause analysis after 7 significant accident or releases. 8 Five, explicitly accounting for human 9 factors. Six, requiring structured methods to 10 ensure effectiveness of safeguards. And seven, 11 most importantly, employee participation in all 12 elements of the PSM standard. 13 DIR and Cal/OSHA are working toward 14 submitting the proposed PSM regulations to the 15 Occupational Safety and Health Standards Board 16 this year along with an economic analysis of 17 those changes to the Occupational Safety and 18 Health Standards Board. This will initiate the 19 process of formal rule making and public comment. 20 After the Standards Board adopts the 21 proposed changes the new standard for refineries 22 will be submitted to the Office of Administrative

(202) 234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. 67 1 Law for approval. It is anticipated that the 2 revised PSM standard will go into effect in 2016. 3 A new assessment on the state's oil 4 refineries implemented by DIR in 2013 or the 5 Department of Industrial Relations, requires 6 refineries to provide funding support to DIR for 7 Cal/OSHA's PSM refinery program. The assessment 8 is based on the number of barrels of oil 9 processed each year as a percentage of the 10 state's total. 11 These funds, which are independent of 12 the state's general fund, have allowed DIR to 13 expand the staffing of the PSM Unit from ten 14 personnel in 2012 to 27 today. Among the newly 15 hired staff that the new funding has allowed the 16 PSM Unit to hire are nine new compliance officers 17 with either chemical or mechanical engineering 18 degrees and support the PSM Unit's training 19 program. 20 Before conducting a PSM inspection all 21 newly hired compliance officers receive 15 weeks 22 of intensive, technical and field training which

(202) 234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. 68 1 provides 600 hours of training to each compliance 2 officer. Prior to 2013, inspection of the 3 state's petroleum refineries was limited by time 4 and resource constraints. 5 In most cases a single compliance 6 officer conducted two to three planned refinery 7 inspections per year in addition to responding to 8 complaints, accidents and referrals. Planned 9 inspections typically focused on one element of 10 the PSM standard, such as operating procedures 11 usually in a single unit of the refinery. 12 The inspection required about 80 hours 13 over two weeks to complete. By contrast in 2014, 14 thanks to the presence of more compliance 15 officers, the PSM Unit conducted significantly 16 more inspections and these inspections were far 17 more thorough. 18 In total the PSM Unit conducted six 19 refinery inspections, two of which were planned 20 program quality verification inspections and 21 averaged 1,530 hours for each refinery. The 22 other four inspections were accidents which

(202) 234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. 69 1 averaged 306 hours each and two complaints 2 inspections averaging 802 hours each. 3 A PQV inspection is an inspection in 4 an establishment covered by the PSM regulation 5 performed by compliance personnel who have 6 successfully completed the division sponsored and 7 approved training. 8 The PQV inspections entail a 9 comprehensive evaluation of the establishment's 10 program for complying with each PSM element, the 11 quality of the establishment's program compared 12 to recognized and generally accepted good 13 engineering practices and verification of the 14 effectiveness of the establishment's program 15 implementation. 16 As a side note, in calendar year 2014 17 the PSM Unit conducted two complaint inspections 18 totaling 1,605 hours and two terms of probation 19 type inspections totaling 904 hours at the 20 Chevron refinery in Richmond. JR is taking the 21 leading in developing enhanced coordination of 22 oversight and enforcement activities of the

(202) 234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. 70 1 petroleum refineries with federal, state and 2 local agencies. 3 In 2014, Cal/OSHA provided a total of 4 160 hours of advanced PSM training to local 5 Certified Unified Program Agency representatives 6 or CUPA representatives which oversee the CALARP 7 program, federal EPA compliance officers and 8 Contra Costa Counties refinery inspectors in 9 their Hazardous Materials Unit. 10 In 2015, DIR is coordinating an 11 interagency enforcement working group to discuss 12 the coordination of enforcement activities, 13 including cross referrals, cross training and 14 joint or coordinated inspections and auditing. 15 The working group will also identify the 16 refineries to be targeted for inspection. 17 Lastly, the group will discuss the 18 facilitation and development of an electronic 19 information data sharing system among federal, 20 state and local agencies. The system will 21 include information about inspections, compliance 22 and enforcement activity as well as the means to

(202) 234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. 71 1 collect information identified in reports and a 2 process for timely flow of information between 3 regulatory agencies. 4 Lastly, I would personally like to 5 thank the CSB for its assistance and guidance in 6 this process. 7 CHAIRPERSON MOURE-ERASO: Thank you 8 very much, Mr. Trombettas. I would like to call 9 now Mr. Bill Lindsay, the City Manager of the 10 City of Richmond, California. 11 MR. LINDSAY: Thank you, Mr. Chair. 12 And I'd like to begin by thanking the Chemical 13 Safety Board for once again coming to the City of 14 Richmond and having this public meeting. I think 15 it's very important in the process and I think 16 you've shown great leadership. 17 And I did want to also thank the staff 18 for the really excellent and detailed, thorough 19 work that you did. And this has been very 20 important in our learning process. I'm here 21 representing the Richmond City Council. Mayor 22 Tom Butt can't be here this evening.

(202) 234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. 72 1 And I believe we may have some other 2 Council Members here this evening. Vice Mayor 3 Jael Myrick, Council Member Nat Bates, Council 4 Member Jovanka Beckles, Council Member Eduardo 5 Martinez who I believe may be here and former 6 mayor and current Council Member Gayle McLaughlin 7 who I believe is here also. 8 I also wanted to acknowledge the work 9 by our staff who I think have worked closely with 10 the CSB staff, in particular Lina Velasco, our 11 principle planner. Also here this evening is our 12 new fire chief who wasn't here during the 13 incident, Adrian Shepherd and Terry Harris our 14 fire marshal all of whom are learning from the 15 outstanding work you did. 16 In terms of the recommendations I 17 really want to let you know where it stands in 18 terms of what the city has been doing. After the 19 CSB issued its interim report a joint committee 20 which was made up of Council Members Jim Rogers 21 and Javonka Beckles, also it included County 22 Supervisors John Gioia and Federal Glover, was

(202) 234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. 73 1 formed to work with city and county staff to 2 develop language to address the CSB's 3 recommendations. 4 So this was over a year and a half ago 5 now. As part of the process a working group on 6 the industrial safety work, on the Industrial 7 Safety Ordinance was formed to gather input from 8 different stakeholders and to prepare a draft 9 ordinance. In July of 2014, their work on the 10 Ordinance was completed and the City Council 11 adopted amendments to the Industrial Safety 12 Ordinance. 13 And in particular the proposed 14 amendments include language that requires 15 stationary sources to perform inherently safer 16 systems analysis. And that is specifically every 17 five years for existing covered processes in the 18 development and analysis of recommended actions 19 identified in a process hazard analysis. 20 As part of a management of change 21 review whenever a major change is proposed at a 22 facility that could reasonably result in a major

(202) 234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. 74 1 chemical accident or release. When an incident 2 investigation report recommends a major change 3 that could reasonably result in a major chemical 4 accident or release. 5 When a root cause analysis report 6 recommends a major change that could reasonably 7 result in a major chemical accident or release 8 and during the design of new processes, process 9 units and facilities. So again, these amendments 10 that we incorporated include language that 11 requires stationary sources to perform this 12 analysis for inherently safer systems. 13 So we've tried to take that language 14 and put it into practice through our ordinance. 15 As you may know, the city's Industrial Safety 16 Ordinance is intended to conform with that of 17 Contra Costa County. In fact the Contra Costa 18 County Health Services is charged by the City's 19 ordinance as authority charged with enforcing the 20 requirements of the ISO Ordinance. 21 So we work very closely together and 22 one thing that this process allowed us to do is

(202) 234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. 75 1 conform our ordinance with theirs more closely so 2 that we have better administration. There were 3 some other recommendations that came out of the 4 reports, specifically participation in a joint 5 regulatory program. 6 The City has been working State's 7 Refinery Safety Task Force to host community 8 input meetings on potential regulation changes 9 and we are certainly ready to participate in this 10 joint regulatory program as soon as it's 11 established. Overall just again, goal of the 12 Chemical Safety Board as we understand it is to 13 reduce the risk of an accidental release to as 14 low as reasonably practicable or ALARP. 15 And the proposed amendments or the 16 amendments that we adopted acknowledge this goal 17 and include the language that says the purpose 18 and goal sections of the City's ISO are in 19 preventing and reducing the number, frequency and 20 severity of accidental releases in the county to 21 the greatest extent feasible. 22 And we feel that this language is

(202) 234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. 76 1 equivalent to and perhaps stronger language even 2 than the ALARP standard. I think with that I 3 will turn it over to Randy Sawyer who can really 4 provide more detail in terms of how this process 5 is being further implemented and how the staffing 6 is going. And again, I just want to thank you 7 very much for your work, for being here this 8 evening and for your help. 9 CHAIRPERSON MOURE-ERASO: Thank you 10 very much, Mr. Lindsay. So now I call on Mr. 11 Randy Sawyer, the Director of the Hazardous 12 Materials Program of the Contra Costa County. 13 Mr. Sawyer. 14 MR. SAWYER: Thank you, Chairman 15 Moura-Eraso and other Board Members. As Mr. 16 Lindsay mentioned we worked closely together in 17 looking at the Industrial Safety Ordinance and 18 revising it. 19 And the language is basically 20 identical between the county's and the City of 21 Richmond's Industrial Safety Ordinance. So as he 22 mentioned we addressed some of the

(202) 234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. 77 1 recommendations, the two recommendations that 2 looked at amending the Industrial Safety 3 Ordinance to include inherently safer systems and 4 expand on that, expand on where in the Industrial 5 Safety Ordinance more than what we had already in 6 there. 7 Also looked at doing what we call a 8 safety protection analysis or safeguard 9 protection analysis which looks at how effective 10 the safeguards are and when they look at a 11 process hazard analysis. And that's using 12 basically what is called a level of protection 13 analysis or LOPA. 14 And that is, or some equivalent that 15 is approved by our department before they could 16 use it, an equivalent method. So those, we 17 worked closely together. We had the joint 18 committee and we had a working committee. And we 19 feel like we fully adopted those two 20 recommendations. 21 The other recommendation basically 22 looking at the damage, one of the recommendations

(202) 234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. 78 1 is to monitor and confirm the effective 2 implementation of a damage mechanism hazard 3 reviews. It was a recommendation for Chevron to 4 perform. 5 And what we've done on that, one of 6 the things that Chevron had a project they had to 7 do an environmental impact review on is called a 8 modernization project. And they did an extensive 9 damage mechanism review for the areas that the 10 project covered, which is many different 11 processes within their refinery. 12 We sat in on some of those review 13 sessions to see that they actually, what kind of 14 process they had in place and how they were 15 implementing it. They have also looked at all 16 the piping in the refinery that could potentially 17 have sulfidation corrosion where the temperature 18 of the piping could be above 450 degrees. 19 And they've looked at all those and 20 then they have plans in place. They are 21 replacing some piping or increasing inspections 22 or anything. But they are in the process of,

(202) 234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. 79 1 they are, have a plan of action to address all 2 the findings they found in that review. 3 They've also, we've also, they're 4 looking at lower temperatures where sulfidation 5 could occur and they're looking at the piping at 6 this time there. We're also meeting with them 7 and making sure how they implement the findings 8 for their damage mechanism reviews and do their 9 process hazard analysis. 10 So we continue to follow that process 11 and we'll continue to follow it even through our 12 audit process and inspection process and in the 13 other meetings with the refinery. Another one is 14 to look at a joint regulatory program to share 15 information among, to different agencies 16 basically. 17 And we've been working with Cal/OSHA, 18 Cal EPA, Cal OES on how, California Office of 19 Emergency Services, on how we can share 20 information, what kind of repository there will 21 be, how we can be, maybe perform at least work 22 together on inspections and how we do stuff. As

(202) 234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. 80 1 Mr. Trombettas said, we worked with them on 2 following up on some items that came out of the 3 Chevron. 4 We've also done the same thing after 5 Tesoro incidents that occurred last year. So we 6 worked closely with Cal/OSHA in the past. We 7 plan to continue to do so. Some of the things 8 that we changed that really address those things 9 in Industrial Safety Ordinance for both the city 10 and the county was just as one of the purposes 11 and goals is to facilitate cooperation between 12 the industry, the county and we added some 13 agencies like the local fire departments, 14 Cal/OSHA, EPA and other agencies that may have 15 oversight of the refinery. 16 So we want to make sure we have 17 continued cooperation with them as they do their 18 work. Another section in the ordinance to even 19 expand a little bit on that, our copy of our 20 final determinations of our audits and 21 inspections we will share, which we had been 22 doing but we're expanding this.

(202) 234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. 81 1 We will share this with Cal/OSHA, EPA 2 and local fire departments that have oversight 3 over the stationary sources. So that's trying to 4 foster more cooperation between the different 5 agencies as we move forward. 6 In the regulatory report, your second 7 report, you made a recommendation to look at our 8 compensation system and how we can get better 9 regulatories to hire basically and to be able to 10 get the right technical experience they have. 11 Our Board of Supervisors working with the unions 12 actually was able to come up with a, some 13 compensation for them and actually they were 14 going to increase their salaries for the 15 engineers that have oversight over the Industrial 16 Safety Ordinance and the California Accidental 17 Release Prevention Program by 25 percent over the 18 next three years. 19 As of July 1, 2014, there was a 12 20 percent increase. July 1, 2015, there will be 21 another ten percent increase and then July 1, 22 2016, there will be three percent. This will

(202) 234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. 82 1 bring the annual salary range, your base salary 2 range between $96,394 and $117,168. 3 And we're in the process of trying to 4 hire more people. We still have one opening, 5 actually two openings. We're working with the 6 city. One of the recommendations that the city 7 made or one of the things they put actually in 8 their ordinance that was different from ours is 9 that there would be a full-time engineering 10 position to look at process safety issues at the 11 Chevron refinery. 12 And we're in the process of trying to 13 hire someone to fill that position. One of the 14 things that wasn't a recommendation to us, the 15 county or the city, was to look at process 16 safety, leading lagging process safety 17 performance indicators. 18 And that was a recommendation made to 19 Cal EPA which actually to state, not just EPA but 20 Department of Industrial Relations. That is 21 actually being looked at as part of the 22 regulatory package that Mr. Trombettas talked

(202) 234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. 83 1 about just a few minutes ago. 2 But it's something that we've already 3 put in our ordinance. We're requiring our 4 facilities to cover the Industrial Safety 5 Ordinance to actually have two sets of, type of 6 indicators. One is what we call common 7 indicators that will be public and it would be 8 consistent between all the facilities covered in 9 the Industrial Safety Ordinance. 10 And they would be, it would be on an 11 ongoing basis, on an annual basis they would give 12 us updates on where they are at. And the other 13 one was that each facility is supposed to develop 14 their own indicators that go beyond that. 15 The four indicators that we were 16 looking at is common indicators is looking at 17 past due recommendations from process hazard 18 analysis, past due recommendations, if there's 19 past due recommendations from incident 20 investigations and past due inspections for 21 piping and equipment. 22 And also the accident reports, the

(202) 234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. 84 1 accident, major accident reports that you get 2 through API that those would also be available, 3 that would be part of the process too. So that's 4 basically some of the things that I think we've 5 been addressing pretty thoroughly. 6 One of the things that, on the last 7 recommendation and the final report that just 8 came out our Board's put together an ad hoc 9 committee to look at the Industrial Safety 10 Ordinance after the Chevron fire. And that's 11 something we're going to be reporting back to 12 them very shortly. 13 We met with the ad hoc committee 14 earlier this week and they would like a report 15 back on how we're going to address that 16 recommendation also. 17 CHAIRPERSON MOURE-ERASO: Thank you 18 very much, Mr. Sawyer. Now I would like to give 19 opportunity to our investigative team in the 20 person of Mr. Holmstrom and of the Board to 21 address some questions to the panel. 22 So we're going to put you through a

(202) 234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. 85 1 little bit of an interrogation here. So I would 2 like, do you have any questions, Mr. Holmstrom, 3 for the panel? 4 MR. HOLMSTROM: Just a comment. I 5 think the actions that have been taken are really 6 exemplary and appreciate the proactive nature of 7 your actions you've taken. And I think you're 8 setting a model actually for the rest of the 9 country in terms of working together and taking 10 proactive steps to improve safety. 11 So I want to commend all three of you 12 for the steps that your respective agencies have 13 taken. Thank you. 14 CHAIRPERSON MOURE-ERASO: Thank you, 15 Mr. Holmstrom. Mr. Ehrlich, do you have any 16 questions to the panel? 17 MR. EHRLICH: No, I don't. Thank you 18 again. I echo the sentiments of Mr. Holmstrom. 19 As I said I've been an executive in the private 20 sector for a long time and I think it's 21 definitely going to prove very valuable not only 22 here but across the country as well. Thank you

(202) 234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. 86 1 very much. 2 CHAIRPERSON MOURE-ERASO: Thank you. 3 Mr. Griffon. 4 MR. GRIFFON: Thank you. I'm also 5 going to disappoint. I'm not going to have 6 questions. I also just want to make a comment 7 that I'm happy to hear the progress being made 8 and I'm also glad the work that the CSB has done 9 has seemed to have been a catalyst for some of 10 those improvements. So it's very, very good to 11 hear your progress. Thank you. 12 CHAIRPERSON MOURE-ERASO: I do have a 13 question. I mean of course as the Chairperson of 14 the agency I echo the feelings and the statements 15 of my colleagues about how satisfying it is to 16 see that actions happen to our recommendations 17 even proactive actions is the case here. 18 I do have a question that I think is, 19 has been an important development also here in 20 California. This goes to Mr. Trombettas and that 21 is I understand that a new regulation was passed 22 in California that relates to refinery

(202) 234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. 87 1 turnaround. 2 So my question is what is the nature 3 of the regulation, somehow if it at all relates 4 to PSM and your PSM efforts? 5 MR. TROMBETTAS: Yes, if I were to 6 include it in my statement it would have been 7 over five minutes. But it's actually Senate Bill 8 1300, requiring turnarounds. 9 CHAIRPERSON MOURE-ERASO: The mike. 10 MR. TROMBETTAS: Sorry about that. 11 Okay. How is that? So Senate Bill 1300 dealing 12 with refinery turnarounds. And kind of in a nut 13 shell what it does is on September 15th of every 14 year all 15 refineries in the State of California 15 are to provide Cal/OSHA or the PSM Unit with 16 their scheduled turnarounds, their turnaround 17 schedules for the following year. 18 So September 15, 2015, we would 19 receive all the turnaround schedules of all 15 20 refineries for 2016. We would, the staff would 21 review those schedules and based on a review of 22 those schedules two refineries up north and two

(202) 234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. 88 1 refineries down south would be picked for 2 inspection, turnaround inspection. 3 Sixty days prior to the inspection the 4 refineries, the two refineries up north and south 5 will be required to provide all the information 6 on deferred maintenance. So any maintenance that 7 was put into the turnaround schedule but say the 8 turnaround team, impact team at some facilities 9 would be called, say reject it or say they would 10 defer it past the turnaround there has to be a 11 written justification as to why. 12 And then 30 days prior to the 13 turnaround if there's any additional deferred 14 maintenance there would have to be written 15 justification. Usually say the first, I don't 16 like to pick on refineries at least the first 17 week of a turnaround because they're pretty hot 18 and heavy. 19 But you get about the second week of 20 the turnaround we would open an inspection and we 21 would review those deferred jobs or tasks and 22 really sit down if their justification, if the

(202) 234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. 89 1 refinery's justification is okay or not. If it's 2 not okay then it's going to open some dialogue as 3 to why it's not being conducted at the existing 4 turnaround. 5 Also it gives us the opportunity to, 6 there's another bill called Senate Bill 54 which 7 deals with maintenance contractors during 8 turnarounds, to review all out of state 9 contractors because California is unique in our 10 regulations that a lot of times we get 11 contractors coming from out of state to work in 12 refineries that do not understand or sometimes 13 even comply with our existing Title 8 14 regulations. 15 So we would be inspecting all of the 16 out of state contractors as well. It will be a 17 busy time during these turnarounds. 18 CHAIRPERSON MOURE-ERASO: It's a very 19 interesting regulation I guess. And it's a thing 20 that I believe, I hope that is being looked at 21 the national level because it's a very good tool 22 to identify problems, you know, especially around

(202) 234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. 90 1 turnaround operations that are so critical. 2 So thank you very much. I would like 3 to continue the agenda. In the agenda we have 4 public statements from people that have signed 5 that would like to address the Board. And but 6 before moving into that I would like for us to 7 take a break of five minutes to take a breather. 8 So five minutes break. 9 (Whereupon, the above-entitled matter 10 went off the record briefly.) 11 CHAIRPERSON MOURE-ERASO: Okay. 12 Having finished our break I guess we'll continue 13 with our agenda. I would like to call on our 14 Managing Director, Dr. Daniel Horowitz to 15 facilitate the public discussion. So, Dr. 16 Horowitz. 17 DR. HOROWITZ: Thank you, Mr. 18 Chairman. There is one yellow sheet in the back 19 of the room. If you have not yet signed up for 20 public comment you are more than welcome to do 21 so. First commenter is Chairman John Gioia of 22 the Contra Costa County Board of Supervisors.

(202) 234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. 91 1 MR. GIOIA: Good evening. I'm John 2 Gioia. I live in Richmond. I represent this 3 area of the Board of Supervisors and have chaired 4 this year. Let me first start by thanking the 5 Chemical Safety Board for coming back to Richmond 6 and for holding your meeting. 7 CHAIRPERSON MOURE-ERASO: Right. 8 Excuse me, but one of our Board Members they just 9 arrived. Okay, I'm sorry, go ahead. 10 MR. GIOIA: Thanks. First again, just 11 to thank the Chemical Safety Board for coming to 12 Richmond. I think it says a lot to hold your 13 vote, have the meeting, hear public input and 14 hold your vote here in our community. 15 So let me just say we greatly 16 appreciate that and I want to especially thank 17 your thoroughness, your professionalism and your 18 transparency in investigating the root causes of 19 the 2012 fire and making thoughtful 20 recommendations to the city, to the county, to 21 Chevron and to other agencies in your earlier 22 reports.

(202) 234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. 92 1 As you're aware, I think it's 2 important that you know we took your 3 recommendations of your previous reports 4 seriously. The City of Richmond and Contra Costa 5 County both amended our Industrial Safety 6 Ordinances to fully incorporate your recommended 7 changes to what is already the strongest local 8 Industrial Safety Ordinance in the country. 9 And as you may know, there has been 10 some consideration whether it's adopted more 11 state wide to apply to refineries in Southern 12 California. Also the city and the county 13 established an oversight committee which included 14 representatives of the community, labor and 15 public agencies to oversee the development of a 16 safety culture assessment of the Chevron 17 refinery. 18 And that assessment is currently in 19 the process of winding up. It's being conducted 20 by an independent third party that's basically 21 assessing all the safety culture aspects at the 22 refinery and it's conclusions and recommendations

(202) 234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. 93 1 will be released when it is completed very soon. 2 I've read through your new findings 3 and recommendations just released in your final 4 report. And again, I think you've been 5 thoughtful and I appreciate those new 6 recommendations. 7 Our Industrial Safety Ordinance ad hoc 8 committee of our Board met earlier this week. 9 We've asked Randy Sawyer, our Director of 10 Hazardous Materials to report back to our 11 Industrial Safety Ordinance Committee with 12 recommendations on how to address and look 13 forward to how to implement best your new 14 recommendations. 15 I do want to close by saying I think 16 it's important for everyone to know that your 17 extensive efforts investigating and making 18 recommendations are appreciated by the community. 19 They're appreciated by Contra Costa County and 20 your leadership of your Board and your staff has 21 been important to achieving safety improvements 22 at the refinery and improvements to our own

(202) 234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. 94 1 Industrial Safety Ordinance. 2 And we look forward to continuing to 3 work with you. And again, thanks for coming to 4 Richmond and helping improve safety in our 5 community, thanks. 6 CHAIRPERSON MOURE-ERASO: Thank you. 7 (Applause) 8 DR. HOROWITZ: Thank you. Next up and 9 if you've accidently signed up here thinking you 10 were just signing up for the meeting that's fine. 11 You don't have to comment. But we have a number 12 of folks. Mary Wesley, Ms. Wesley. 13 Paul and Angie Lavely, I believe it 14 is. And, sir, if you don't mind for the 15 transcript could you spell out your name? 16 MR. LAVELY: Yes, it's Lavely, L-A-V- 17 E-L-Y. Well first I would like to recognize the 18 amount of work that you did. I know that only a 19 small portion of the team that worked on this 20 could possibly be here tonight. 21 There had to be ten to 15 people who 22 worked on this report from all areas. And it is,

(202) 234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. 95 1 I think an excellent report. I was glad to also 2 see that you said that you felt you had gotten 3 very good cooperation from Chevron both at the 4 management level and at the employee level 5 because no report such as this could be written 6 without that cooperation, certainly if it was it 7 wouldn't be accurate. 8 The other is I have 25 or so years of 9 experience in nuclear power emergency planning 10 and planning. I was very surprised to see that 11 refineries don't have a lessons learned program 12 wherein accidents, problems, experience that 13 other refineries, other units that are similar 14 are passed on to them as an industry and 15 evaluated by an individual plant to see how it 16 affects them and what actions they need to take 17 or to assure that actions have already been 18 taken. 19 That was a very big surprise. I know 20 that nuclear power is a more regulated 21 environment. But still it appears what limited 22 research I was able to do that this specific

(202) 234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. 96 1 problem is an industry wide program problem. 2 It's something that occurs to these 3 pipes and it shouldn't have taken a lot of review 4 to say, wow, look at the consequences we can have 5 if this occurs. We need to make sure that we 6 don't have this problem and that we're not going 7 to have it any time in the near future. 8 The other was is that it didn't look 9 as though there was enough emphasis on the group 10 that was reviewing safety items or process items 11 to make sure that someone said you must do your 12 job. If you feel that you can't do your job you 13 must come to management and tell us what your 14 concern is and what we need to do to help you. 15 At least there needs to be a free 16 discussion why one group believes that something 17 needs to be done and another group feels that it 18 doesn't, an analysis, a careful review not in the 19 heat of the moment of a fire. But at the time 20 the decision is being made as to whether an item 21 can be postponed or perhaps not even done or 22 whether there's an alternative method to do it.

(202) 234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. 97 1 But there has to be the understanding, 2 not stop work, but in doing your job that if you 3 feel you're not being able to do your job you 4 have to be able to go to management, that's a 5 broad term. But you have to go to someone who 6 has the power and authority to say okay, let's 7 hear your side. 8 It will be expensive. Perhaps it's 9 going to be expensive but it's going to be a hell 10 of a lot cheaper than what occurred in that 11 accident. But that was all I had to say. Thank 12 you very much. 13 CHAIRPERSON MOURE-ERASO: Thank you. 14 DR. HOROWITZ: Thank you. Is there a 15 Carlton Jones? I notice a couple of Members of 16 the City Council have signed up here and since 17 we're their guests I suppose we ought to ask them 18 if they would like to speak. Eduardo Martinez. 19 MR. MARTINEZ: Eduardo Martinez, E-D- 20 U-A-R-D-O, M-A-R-T-I-N-E-Z, City Council Member, 21 former Planning Commissioner. And I want to 22 thank you for the thorough and exacting work that

(202) 234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. 98 1 you did on the Chevron fire. 2 It was very informative and helpful on 3 the Planning Commission for writing the 4 recommendations for the modernization project. 5 Unfortunately, many of the recommendations that 6 we made were disregarded and hopefully we can 7 reinstitute them at some later date. 8 I believe that your recommendations of 9 creating a safety case model is important to 10 maintain the safety of our community and 11 hopefully we can look at them again and make them 12 part of our safety program. But many, many 13 thanks for you doing the work that you've done 14 and for doing it here in Richmond. Thank you 15 very much. 16 DR. HOROWITZ: Thank you. 17 (Applause) 18 DR. HOROWITZ: Gayle McLaughlin. Nice 19 to see again, Mayor. 20 MS. MCLAUGHLIN: Nice to see you. 21 It's great to see you all again and thank you, 22 Mr. Chairman and Members of the Board and staff

(202) 234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. 99 1 of the CSB. We're very, very appreciative here 2 in Richmond for the really detailed work that you 3 have done and the time and effort that such a 4 reputable Board as yourselves come to Richmond 5 and give us your expertise. We really think it 6 helped enormously. 7 Every time I see the animation that 8 you put forward and it's circulated of course, 9 the internet and such, but it's so profoundly 10 both explanatory and impacting, you know. So 11 that was, that's one of the things that I think 12 has really broken it down for all of us to really 13 feel what happened and the problem and the danger 14 that so many were in, so many workers and the 15 community at large. 16 So I just want to say I support your 17 recommendations. The call for more corrosion 18 resistant metals in the piping. The call for 19 worker's rights to shut down operations during a 20 chemical leak or other dangerous operations. 21 Your call for strengthening the ISO and I am on 22 the, now on the ISO Subcommittee of the Richmond

(202) 234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. 100 1 City Council myself and Jovanka Beckles. 2 So I will definitely be working with 3 the county to implement the development of an 4 oversight committee as you are calling for as a 5 recommendation. And I think that is just in line 6 with what we have many kind of alliances of 7 groups, community groups and workers unions have 8 already gotten together. 9 This will formalize this and bring in 10 other parties to make sure that a true oversight 11 body is in place as per our ISO. And I also want 12 to thank you for confirming illegal management 13 decisions that nearly killed the 20, 19 workers 14 nearly 20 workers and sent more than 15,000 of 15 local residents in the area to the hospital. 16 And I want to say the other thing that 17 I think the animation brought out for me was how, 18 just the worker's lives, you know, and to use the 19 phraseology that we hear in today's world, 20 Chevron's workers lives matter. You know, they 21 matter. 22 (Applause)

(202) 234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. 101 1 MS. MCLAUGHLIN: They matter to me as 2 a representative of the people of Richmond and 3 they matter to our community I know as do our 4 communities lives matter as well. So I look 5 forward to being a part of implementing these 6 recommendations. 7 And one thing that the Richmond, that 8 we have at the Richmond City Council level that 9 we implemented a few years back was to make sure 10 that the principles of the precautionary 11 principle get implemented in every decision we 12 make basically meaning do no harm. 13 You know, every decision that a city 14 makes and I believe every decision that a 15 corporation makes should be given that full 16 understanding do no harm. Perhaps if that was in 17 the vision, in the thinking as well as all the 18 knowledge that you have shared with us that 19 should have been in their thinking, that 20 refinery, that unit would have been shut down and 21 the damage and the pain and the suffering and all 22 the harm that accident created, the trauma, et

(202) 234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. 102 1 cetera would have been avoided. 2 So again, thank you so much and we are 3 so glad you came to Richmond. Thanks. 4 CHAIRPERSON MOURE-ERASO: Thank you. 5 (Applause) 6 MR. HOROWITZ: Thank you. Next is 7 Andres Soto with CBE. 8 MR. SOTO: Good evening, Mr. Chair and 9 Members of the Board. I want to echo the 10 gratitude that we in Richmond have for you to 11 come here to hold this hearing here, to bring 12 your findings here to our community so we can 13 hear it firsthand, not filtered through the 14 media. 15 Unfortunately there isn't more media 16 here. But this is important to our community. 17 We are very clear as we demonstrated in the rally 18 out in front what's good for the workers is good 19 for the community. 20 We strongly support the worker's right 21 to stop the work when it's too dangerous and we 22 believe that really needs to be enforced, it

(202) 234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. 103 1 needs to be developed and cultivated because as 2 Gayle was just saying, you know, looking at that 3 animation it's really kind of ridiculous now in 4 hindsight that they would even think about 5 continuing to operate while trying to deal with a 6 leak. 7 So that and a lot of other work needs 8 to be done. Clearly the public notification 9 system fell far short. And so that's being 10 worked on. But we hope that this is a turning 11 point in the culture of the relationship between 12 Chevron and the community. 13 Of course, it's like Democracy, it's 14 going to take eternal vigilance. We're training 15 the young people now so they can be as vigilant 16 as some of us who are a little more gray haired. 17 So thank you so much for being here and 18 appreciate your work very much. 19 (Applause) 20 CHAIRPERSON MOURE-ERASO: I would like 21 to also acknowledge that Mr. Soto and his 22 organization when we finished the second

(202) 234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. 104 1 regulatory report they provided to all the 2 Members of the Board with a certificate of 3 recognition that we value very much and is in a 4 prominent place. Thank you for that. 5 (Applause) 6 MR. HOROWITZ: Next up and I may 7 struggle with the pronunciation a little bit is 8 Torm Nompraseurt, thank you. And could you 9 please spell your name for the transcript? 10 MR. NOMPRASEURT: Torm Nompraseurt. 11 The first name is T-O-R-M. Last name is N-O-M-P- 12 R-A-S-E-U-R-T. I'm here on behalf of the 13 (inaudible) Committee but also a couple of the 14 Asia Pacific Environmental Network leaders and 15 members that were here earlier but they had to 16 leave. 17 They want me to make sure that I thank 18 you CSB Board and the staff. You have done a 19 good work, tremendous work that you put this 20 report together. This is the third time actually 21 we mention that you came back to Richmond. 22 For me personally it's a significant

(202) 234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. 105 1 that you are providing to ask the community 2 because now we have a tool to say to the City 3 Council, a tool to see the supervisor and say why 4 don't you do that because they recommend it. We 5 have been screaming and yelling for 40 years. 6 I live here since 1975 before Chevron 7 got here I was still, I was here. The problem as 8 you see it always come down to Chevron to pick 9 like make money or not to make money. And they 10 don't care what the community has to do, what may 11 die or say because we've been coming to the City 12 Council for I came in here 40 years, 39 years. 13 And to supervisor also. I asked him 14 to provide the policy, provide the law that 15 Chevron has to comply. And every time they do 16 that it's always what's done. It's nothing. 17 He would right now, couldn't right 18 now, the city ordinance and the county ordinance 19 it's not satisfied the committee because Chevron 20 kept saying we're going to do this, we're going 21 to do that and they've never done it. 22 So it happened again and again. And

(202) 234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. 106 1 so I'm not just here to complain because it's the 2 fact of the history you already have from, you 3 know, from day one until today even after the 4 December, August 6, 2012, it still happened. A 5 couple of weeks ago we still encountered with the 6 Chevron issue. 7 What we want is really the safety 8 prevention. That is the bottom line for the 9 community and for the workers who work there. 10 The workers there are community members. They 11 have family life. They have children, 12 grandchildren just like us. 13 And we totally support them whatever 14 that they ask for Chevron should do so. And it's 15 good for them, good for us for safety. We ask 16 for safety. We don't ask nothing. It's really 17 safety prevention. Chevron can use technology 18 better technology, better training for all their 19 staff, even management. 20 They have to have training in order so 21 it doesn't say well I didn't know that. I forgot 22 about that. So it has to be training for all the

(202) 234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. 107 1 workers and management all the way to the top 2 management. 3 Those are something we want to see. 4 So it doesn't have any fall there. And also I 5 think it's important to cap the crude, what kind 6 of crude come in because the more dirty crude the 7 more it's going to cause problems and Chevron is 8 going to try to refine the machine and they can 9 try to run as you see earlier the allowment of 10 the, a degree of a certain level. 11 But then they put high level even 12 though between 100 to 125 degrees there is 13 tremendous different heating there. Not talking 14 about from 100 to a couple hundred different. 15 Those are the things that our members, our 16 community asks. 17 But also thank you very much for you 18 provide this report. You give us a tool to go to 19 our local and state policy maker to say that 20 these are recommendations and we want this to be 21 happening in the policy. Thank you so much. 22 (Applause)

(202) 234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. 108 1 MR. HOROWITZ: Thank you. Is there an 2 Elliot Hughes, Mr. Hughes? Please spell your 3 name. Three minutes please. 4 MR. HUGHES: E-L-L-I-O-T, H-U-G-H-E-S. 5 And I am on the Executive Board of the Industrial 6 Workers of the World. I'm just here to support 7 the community as well as the USW 5 and their 8 demand for a stop work authority for the union 9 workers. 10 Obviously this accident could have 11 been prevented if the worker, those workers had 12 the power to shut the refinery down at the time. 13 And as a result from that not being in place the 14 whole working class of Richmond was affected by 15 that. 16 And so, yes, I just wanted to say that 17 my union who is working on organizing the Whole 18 Foods here in Richmond as well as in the entire 19 Bay Area is going to be standing behind the USW 5 20 and the working class community of Richmond as 21 well. And thank you for your report. 22 It was very thorough and informative

(202) 234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. 109 1 and hopefully everybody can come together to make 2 sure that refineries here and everywhere can be 3 run safely and we can make a sustainable 4 transition. Thank you. 5 (Applause) 6 MR. HOROWITZ: Thank you. Greg 7 Karras, CBE. 8 MR. KARRAS: Thank you, Mr. Chairman, 9 Members of the Board. Greg Karras, G-R-E-G, K-A- 10 R-R-A-S. For the record, CBE agrees with your 11 staff's excellent analysis, supports all the 12 recommendations proposed and believes the report 13 isn't going to do enough to make us workers safe 14 by itself. 15 I suspect you would agree with that. 16 For one thing we need to go beyond 17 recommendations, right. I wanted to provide some 18 very specific, only slightly technical 19 perspective from this place based community where 20 we work day in, day out, year in, year out and 21 what we've seen that I think your staff would 22 have seen if you didn't get called to too many of

(202) 234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. 110 1 these disasters in too many parts of the world so 2 that you don't have enough time here. 3 So I'll be brief. But the punch line 4 is what we've learned and learned again from this 5 disaster is we won't be safe until we hold the 6 people who run the oil companies, top managers, 7 accountable in ways they understand as clearly as 8 they understand short-term profits. 9 They kept running the crude unit with 10 a hot leak when they should have shut it down. 11 Right, we see that almost every month with 12 planned flaring that it's not a catastrophic 13 event. It averts one. But it poisons our 14 communities. 15 And oftentimes they say to the air 16 district in writing, well, you know, we make a 17 lot of gasoline in the time that we save by just 18 dumping those gases to the flares. This is not a 19 mystery and I think I would like you to ask the 20 question along with us if it's a right of the 21 workers to shut down unsafe work then why do they 22 have to negotiate with Chevron to get that right

(202) 234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. 111 1 in their contract. 2 (Applause) 3 MR. KARRAS: And I would say part of 4 the reason why is that the people who you are 5 advising, our city, our county, our state, our 6 federal law makers are not holding them 7 accountable at the management level when they 8 keep doing this to us. So please join us in 9 being stronger about that. 10 That's one suggestion to go further. 11 The second one we wrote about, we testified about 12 at your interim hearing. It's just a simple fact 13 that when you have more corrosive feed stock and 14 less resistant materials you can't have an 15 inherently safer system unless you address both. 16 What happens in the communities and 17 what has happened since, as Don Holmstrom said, 18 here in full knowledge since 1999 when five 19 workers died down the way at the Tosco refinery 20 also partly a result of switching crude, is that 21 under pressure from the companies when we talk a 22 whole lot about say the materials for

(202) 234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. 112 1 construction and not a lot about the feed stock 2 they take that as permission to ignore that. 3 And so here today we still have this 4 situation where, you know, Chevron rebuilt in the 5 decades while that pipe that was corroding that 6 ultimately failed, they rebuilt their whole train 7 from their super critical residual extraction to 8 their TKC hydroprocessor, to their FCC unit to 9 make more gasoline from lower quality, higher 10 sulfur crude. 11 Spent a lot of money doing that. 12 Didn't replace the pipe. You know and you've 13 documented that their workers asked them to over 14 and over again for at least a decade. You should 15 know that their workers went beyond that. They 16 filed an unsafe work practice complaint with 17 Cal/OSHA and Cal/OSHA didn't act on it. 18 We went beyond that. CBE and the 19 community took them to court and actually stopped 20 them from going to even higher sulfur crude 21 because we won. We didn't get a court decision 22 that, we couldn't get as far as replacing the

(202) 234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. 113 1 pipes. 2 If you're stronger with us maybe we 3 will. And one last thing I want to say about 4 this, maybe two things, technically your staff 5 says all of this. You know, higher sulfur crude 6 dramatically increases sulfidation corrosion 7 rate. 8 It makes it even harder to monitor and 9 manage because you can't rely on past history 10 after the crude switch and when that rebuild gets 11 done to retool for the different quality of oil, 12 that gets locked into place. 13 So we need to get even here in 14 Richmond today and even in Contra Costa County 15 today but certainly around the country, we need 16 to get to the point where people are hearing you 17 and us when we say prove it and get the, and make 18 sure that the county staff here actually reviews 19 and approves the final inherent safety analysis 20 before that permit gets granted. 21 That's still not happening. That did 22 not happen with Chevron's project to go to three

(202) 234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. 114 1 percent sulfur crude. It's not going to happen 2 most likely next Tuesday at the next refinery 3 down the road that the county is making a 4 decision on. 5 It's not happening around the country. 6 So when your staff says to you look, 95 percent 7 of these refineries have, still have pipes from 8 the early 1980's that they should have replaced 9 well keep in mind that since the mid 1980's 10 they've doubled they're coking capacity. They've 11 invested billions in hydroprocessing, hydrogen 12 plants, crackers, things that go to dirtier oil. 13 And so when you can see this in the 14 official Energy Information Administration's 15 data, the average over that time sulfur content 16 has gone up just as much as it did at Chevron 17 Richmond. It went up quicker in Richmond. It's 18 almost as high on average nationwide as it was 19 when this event happened. 20 We have a ticking time bomb. We have 21 aging infrastructure with dirtier oil and you 22 should join us in saying, hey, nobody is minding

(202) 234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. 115 1 the store. The time to fix this is before the 2 next project gets approved. Thank you. 3 (Applause) 4 MR. HOROWITZ: Thank you. Next is Jim 5 Payne. Mr. Payne, United Steel Workers. 6 MR. PAYNE: Good evening, Mr. Chair, 7 Members of the Board, staff. 8 MR. HOROWITZ: And that is P-A-Y-N-E. 9 MR. PAYNE: P-A-Y-N-E. Thank you for 10 all the hard work you've done. We appreciate the 11 findings and recommendations that you've come up 12 with. I'm with United Steel Workers Local 5. 13 I'm the secretary treasurer there. 14 We represent workers at Chevron, 15 Tesoro and Shell in Contra Costa County. I 16 especially appreciate your finding and 17 recommendation around stop work authority. 18 That's something that is very important to us. 19 We agree with you that while all of 20 the industry says that we have absolute stop work 21 authority our members question it when it comes 22 time to actually put it in place because they get

(202) 234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. 116 1 second guessed and pressured not to exercise it. 2 It is so important that the workers at the 3 Chevron refinery have actually proposed including 4 it in their collective bargaining agreement, 5 absolute stop work shut down process authority. 6 And management's rational response was 7 that's management's rights and isn't willing to 8 discuss it in that context. We are hopeful that 9 your findings and recommendation will help sway 10 them to come to the right conclusion on that 11 proposal and once again we really appreciate all 12 the hard work you guys do. Thank you. 13 (Applause) 14 MR. HOROWITZ: Thank you. Next is BK 15 White, United Steel Workers. Mr. White. 16 MR. WHITE: Good evening. My name is 17 BK White. I'm the United Steel Workers Local 5 18 President. I work with Jim Payne. 19 We've, standing here in support of the 20 CSB not just in this finding but we stand with 21 you guys with the great work that you do 22 throughout our industry throughout the US and

(202) 234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. 117 1 also I would like to give our support to the 2 Chairman and let you know that the United Steel 3 Workers Local 5 always supports you. 4 I would also hope, we would like to 5 thank you for such a comprehensive report. We 6 worked with you guys. It was a pleasure. We 7 know what you're goal was and I believe you 8 achieved it with the root cause of the failing. 9 I hope that Chevron pays heed to your 10 findings and your emphasis on process safety 11 management and lean away from the behavior safety 12 programs that they endorse. I would also like to 13 thank and show our support for the environmental 14 groups and for the progressive leaders in the 15 community and for my workers who are here 16 tonight. 17 As you've heard them come up and speak 18 hopefully when you go back to the refinery you 19 tell them who the real people of Richmond are. 20 And I'm very proud to work in Richmond with 21 progressive politics and their willingness to 22 stand against a major corporation and fight for

(202) 234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. 118 1 their people. Thank you. 2 (Applause) 3 CHAIRPERSON MOURE-ERASO: Mr. White or 4 should I say Brother White, I was a member of the 5 USW and I wanted you to know that for me it means 6 a lot personally, your statement of support of 7 the Chairperson of this organization. And we 8 would like to continue working with you and doing 9 what is right for the workers of Local 5. 10 (Applause) 11 MR. HOROWITZ: Thank you. Next is 12 Eric Larsen. Mr. Larsen, no, let's try it looks 13 like Kathleen Wiber (phonetic) perhaps. I'm not 14 sure of the last name. How about Claudia 15 Citroen? Ms. Citroen. 16 MS. CITRON: C-L-A-U-D-I-A, C-I-T-R-O- 17 E-N. So I'll say the thank you first because you 18 will hear a lot more tonight still. I think for 19 me the most remarkable was just to see you smile 20 when you saw the representative of our city 21 discuss the steps they have taken. 22 And I know you received an honorary

(202) 234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. 119 1 plaque last time and I don't know whether you 2 know all the little things that happened besides 3 all the Chevron things so I just wanted to fill 4 you in. As part of the Chevron upgrade the city 5 at one point asked Camilla Harris to write a 6 recommendation on how the city should proceed. 7 And low and behold it went to a town 8 hall meeting and the city took the, citizens took 9 it apart and took it much further. They wouldn't 10 have done that without your legal expertise, 11 without your vocabulary, without your reasoning. 12 So keep on doing what you're doing. And on the 13 national level I see that newspapers and media 14 keeps being interested in Richmond. 15 And they keep wondering what the heck 16 is going on here and why are we in the paper and 17 how do we get everyone excited about what's 18 happening here? I hope and I wish that you from 19 your point of view also address the media and 20 tell them how you see how your work impacts 21 cities and towns, empowers cities and towns in 22 side stepping government and being very active

(202) 234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. 120 1 and very successful and productive in decision 2 making. 3 I find it very important because it 4 short cuts your work and the work in the cities. 5 So thank you. 6 (Applause) 7 MR. HOROWITZ: Thank you. Okay. Is 8 there a Chan V. Khan (phonetic)? Chan, no, okay. 9 How about AJ Sebenza (phonetic)? Okay, Kate 10 Sibley (phonetic), Ms. Sibley, no. Peter 11 Peterson. How about Rick Alcaraz, Mr. Alcaraz? 12 MR. ALCARAZ: Good evening. My name 13 is Rick Alcaraz. And I haven't faced Cal/OSHA in 14 a long, long time. In the 80's we did a lot, but 15 not so much lately. 16 First of all I would like to bring up 17 the NFPA 2001 which is the National Fire 18 Protection Act, and it has a lot of these so 19 called problems that we have are in it. As a 20 union steam fitter I went through a five year 21 apprenticeship and then I went to school to learn 22 purities and to learn what's in the air.

(202) 234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. 121 1 One of the things that you guys are 2 talking about on the wearing of the pipe which is 3 called in my language is friction laws. Whatever 4 the product is that's going through your piping 5 systems it wears down the integrity of the pipe. 6 And if it's heated it's even faster. 7 But if it's dirty such oil products, I know they 8 clean some of it before it enters the refineries 9 but at the same time they have to add solvents to 10 liquify, you guys all know about that. And that 11 doesn't help. 12 And what you have, any time that you 13 change direction in pipes you have friction laws. 14 By that I mean the integrity of the pipe, the 15 inside of the pipe not the outside. But every 16 time you change directions up and down 45 degree 17 angles back and forth or whatever, we used to put 18 flow meters in these things and they were 19 completed automated back in '88. 20 And for the life of me I look at the 21 pipe up here in the picture right up here and the 22 pipe comes in what we call 40-1-1, 40 feet one

(202) 234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. 122 1 inch long pipe. And the supports, I'm looking 2 for supports and they used to be there but 3 they're no longer in there. 4 As you can tell I haven't been in 5 refineries for a few years. I went into the semi 6 conductor area and stayed in it for a while. But 7 I'd also, I've been here since 1945. I was, 8 first job I had out of high school was at 9 Chevron. I started a pipe fitters apprenticeship 10 there. 11 And they were good to me and but 12 things happen. There's a lot of accidents do 13 happen around here. But, anyway, that's about 14 all I have to say tonight. If I'm wrong about 15 the automation that the flow meters should have 16 been in there or they were in there at one time, 17 you said you were looking for valves. 18 Well there was no valves. When we 19 originally put the refinery in, in the 80's we 20 started working on it and then I went out to 21 Shell in '88 and then I went to Exxon and I've 22 been around the Bay. I've made a good living at

(202) 234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. 123 1 my trade. 2 But if those flow meters were in there 3 they shut off automatic when the flow stops or 4 increases. It's set for one thing, the amount of 5 travel of the product. And as soon as it 6 fluctuates it shuts itself down. So thank you 7 for listening to me. 8 MR. HOROWITZ: Thank you. Dina Razor, 9 Ms. Razor. Jeff Kilbreth, is that you? Why 10 don't you step right up? 11 MR. KILBRETH: I wasn't going to say 12 anything because -- 13 MR. HOROWITZ: Could you spell your 14 name though? Let me reset the timer so that you 15 get your whole time. Go ahead. 16 MR. KILBRETH: Jeff Kilbreth, K-I-L-B- 17 R-E-T-H. I just, I wasn't going to speak because 18 I think I don't have anything to add about the 19 technical matters. I've been to all of the 20 hearings and read all of the reports. 21 I did want to, I wanted to speak 22 primarily because of what a couple of the last

(202) 234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. 124 1 people said about what an impact you've had on 2 Richmond. And I guess I want to say two things. 3 First of all I don't think that the 4 campaign to be seriously involved in studying the 5 modernization project and your negotiating and 6 understanding and trying to actually end up with 7 a good project going forward would have happened 8 nearly as well as it did without your, 9 effectively your leadership and your clarity 10 about searching for a better way to do things. 11 And Supervisor Gioia didn't blow his 12 own horn. But I want to give you an example of 13 what a far reaching effect your report and your 14 focus on continuous improvement has had, you 15 know, beyond just issues of safety. Continuous 16 improvement is as true for emissions reduction 17 and pollution reduction as it is for safety. 18 There should be goals. There should 19 KPI's, you know, these kinds of things. And what 20 we're doing now with the Bay Area Air Quality 21 Management District is taking up questions around 22 what sort of emission reduction should we strive

(202) 234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. 125 1 for over the next ten years. 2 You know, you don't change things by 3 snapping your fingers. These things take time. 4 But you need goals. You need KPI's. It's like 5 safety cases and it's like so much of what you 6 said in your report. 7 And I don't think that the Bay Area 8 Air Quality Management District would be talking 9 about these refinery regulation rules right now, 10 changing them if you hadn't broken the ground. 11 So thank you from the bottom of my heart. 12 (Applause) 13 MR. HOROWITZ: Thank you, Mr. 14 Kilbreth. How about Quanah Brightman, Mr. 15 Brightman. 16 MR. BRIGHTMAN: Good evening. My name 17 is spelled Q-U-A-N-A-H, last name Brightman, B-R- 18 I-G-H-T-M-A-N. My name is of course Quanah 19 Parker Brightman as you just heard, an indigenous 20 person. Also I'm Executive Director of United 21 Native Americans. 22 I would like to, I wanted to come here

(202) 234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. 126 1 and of course bring voice for the indigenous 2 population whose land you're currently occupying 3 on. First and foremost, I would like to thank 4 the Members of the Board and all the people who 5 came and organized this. It was very thorough. 6 We really appreciate that as a 7 community out here. I want to thank you and 8 commend you for coming here and bringing forth 9 this information and informing our community and 10 the world. 11 But there's a number of things that 12 need to be done to further what has been shared 13 here tonight. First and foremost, I'd like to 14 remind people that there are currently 13 15 refineries here in the State of California. 16 There are five here in the greater Bay Area. 17 Now when and if another, you know, 18 catastrophic explosion happens at one of the 13 19 refineries here in California will we see those 20 responsible be brought upon charges of criminal 21 negligence and criminal genocide upon our Mother 22 Earth. Will we see that?

(202) 234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. 127 1 Will that be included in, will that be 2 paper clipped in your little report because quite 3 honestly until these people actually are brought 4 to justice and treated as common criminals as 5 they are for that gross negligence and 6 incompetence this is not going to stop. It's not 7 going to stop. 8 You need to realize that. This is a 9 stepping stone for us. But we need to look 10 forward. We need to build from this, all of us 11 who are here. I'd like to also bring up we must 12 act now to stop these dirty tar sands from being 13 brought in our community and refined here at any 14 and all of the refineries world wide. 15 I want to thank you for your time. 16 Thank you for allowing me to speak, (foreign 17 language). 18 MR. HOROWITZ: Thank you. 19 (Applause) 20 MR. HOROWITZ: Okay. How about Tim 21 Laidman? 22 MR. LAIDMAN: Thank you. I'm Tim

(202) 234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. 128 1 Laidman. I'm with the Green Party of Contra 2 Costa County on the Council there. 3 MR. HOROWITZ: And Laidman is? 4 MR. LAIDMAN: L-A-I-D-M-A-N. And 5 also on the Green Party of California State 6 Coordinating Committee. And I'm standing here in 7 solidarity with the workers of United Steel 8 Workers 5. They are the front line. 9 They are risking their lives and I 10 really appreciate the work that you have all done 11 to make their job safer, the community safer 12 because there's nothing more important than the 13 health and safety of those workers and of the 14 community. 15 The profits of Chevron, which are 16 enormous, are second to all of those. You can't 17 replace a life with a billion dollars. And 18 Chevron has a number of billions of dollars every 19 quarter. But that doesn't bring anybody back 20 that's died. 21 And the work that you've done, I think 22 can save lives. I appreciate that and I thank

(202) 234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. 129 1 you. I also wanted to as an engineer I wanted to 2 thank you for the technical work you've done and 3 as a political activist I would also like to 4 thank you for the political will that you've 5 shown because those corporations with their 10's 6 and 20's and 100's of billions of dollars often 7 exert political pressure and we rarely see an 8 organization, a Board, a government agency that 9 actually has the ability to stand up to that 10 pressure, that influence, that lobbying. 11 We don't see it in our Congress for 12 instance. And I appreciate that you have that 13 ability and you've done what you have done. And 14 I would also echo all the sentiments about the 15 good that it has caused here. 16 I hope that it continues on with 17 stronger Industrial Safety Ordinance. Part of 18 the Planning Commission's work was bartered away 19 by some Council people. But I think if the new 20 Council that the people elected which is full of 21 a lot more progressives will go farther and be 22 making an Industrial Safety Ordinance that gets

(202) 234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. 130 1 some of those lost things back and protects the 2 workers and the community. 3 Thank you for your help in this. 4 Thank you very much. 5 (Applause) 6 MR. HOROWITZ: Thank you. How about 7 Steve Nadel (phonetic), okay. How about Marie 8 Walcek. 9 MS. WALCEK: Hey. Marie Walcek. It's 10 spelled W-A-L-C-E-K. I'm with the California 11 Nurses Association. We represent nurses that 12 live and work near the refinery including at 13 Kaiser Richmond and at Doctors Medical Center. 14 Our nurses are the ones that treated and cared 15 for the 15,000 people that were sent to nearby 16 hospitals after the refinery fire in 2012. 17 And that being said, I'm very grateful 18 to hear a very thorough report talking about what 19 went wrong and how we can prevent this in the 20 future. We're at a time when West County is 21 particularly vulnerable. 22 Whether or not you're aware, Doctors

(202) 234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. 131 1 Medical Center which was the primary hospital 2 that was, had emergency room services nearest to 3 the refinery is now no longer accepting any 4 ambulances and is under serious threat of closure 5 which would mean the only nearby hospital would 6 be Kaiser Richmond, which unfortunately only has 7 15 emergency room beds. 8 So now is a critical time and seeing 9 folks come together to make this refinery safer 10 is good to see. I would like to uplift a lot of 11 what your report recommended, particularly 12 workers rights to stop refinery operations when 13 they sense danger and the rest of the 14 recommendations. 15 And also wanted to echo hearing, you 16 know, what some other people said that we would 17 like to see stricter regulations on the quality 18 of crude used in Bay Area refineries, 19 particularly at Chevron as nurses know what goes 20 in absolutely effects what comes out. So we'd 21 like to see that be a part of the plan moving 22 forward and I hope this is just a small step as

(202) 234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. 132 1 we continue vigilance in improving safety for 2 workers and the community. Thank you. 3 (Applause) 4 MR. HOROWITZ: Thank you, Ms. Walcek. 5 How about Joel Britton. Is there a Joel Britton? 6 MR. BRITTON: That's J-O-E-L, B as in 7 boy, R-I-T-T-O-N. I'm a former operator at the 8 Chevron refinery in El Segundo and the Gulf 9 Refinery in Sante Fe Springs. Proud ten plus 10 year member of the Oil, Chemical and Atomic 11 Workers Union and the Northern California 12 organizer of the Socialist Workers Party. 13 According to US government statistics 14 4,500 workers were killed in the United States on 15 the job in 2010. Our jobs can be dangerous. We 16 all know how dangerous oil refineries can be. I 17 would like to argue that refineries don't have to 18 be places where workers die on the job. 19 No worker should have to die on the 20 job if the corporate bottom lines, profits aren't 21 what dictates how refineries are built and how 22 they are maintained and operated. I believe I'm

(202) 234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. 133 1 going a little bit beyond your report in saying 2 these things. 3 But I believe that we need to address 4 this bigger picture. In order to work toward 5 this workers need to fight to be in charge of all 6 health and safety procedures. Managers, bosses, 7 can't be trusted as this incident at Chevron 8 Richmond has proven as the Chemical Safety Board 9 reports have documented so convincingly. 10 Stop work authority, yes, for real. 11 Workers control of conditions on the job is what 12 is needed if no worker is to die. Workers 13 control enforced by union power. The gentleman 14 over here said cost is always an issue referring 15 to dollar cost. 16 But this whole experience has 17 demonstrated, has underlined the cost in human 18 life is what must determine how refineries, 19 railroads, et cetera are operated, human lives, 20 workers lives and the lives of people in the 21 surrounding communities. We should all support 22 the United Steel Workers in its negotiations for

(202) 234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. 134 1 a new contract, a stronger contract with stronger 2 safety provisions including the right to shut 3 down process. 4 If that first operator who said that 5 process should be shut down had been listened to. 6 But as your report demonstrates workers fear 7 retaliation for exercising what little say they 8 are presumed to have up to this point. But we 9 need to get stronger and the only way we're going 10 to get stronger is for workers ourselves to 11 organize and lead that fight. Thank you. 12 (Applause) 13 MR. HOROWITZ: Thank you. How about 14 Jerry Freiwirth? 15 MR. FREIWIRTH: Jerry Freiwirth. J-E- 16 R-R-Y, F-R-E-I-W-I-R-T-H. And I'm a recently 17 retired operator at the Shell refinery. I'm a 18 retired member of Local 5. 19 I will say that over my 20 plus years 20 the videos and reports from the Chemical Safety 21 Board have been some of the most useful things 22 for operators to understand process and safety

(202) 234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. 135 1 questions. But it remains true that the 2 accidents, the fires, the explosions continue to 3 happen, not just here but Texas City and 4 Anacortes in Washington with a depressing 5 regularity. 6 And I think that goes to a little bit, 7 it turns out what some of the last speaker spoke 8 to. How do we stop this? The recommendations 9 made in this report, particularly around the 100 10 percent inspection or replacement, around stop 11 work authority are all very useful. 12 But where's the power to change the 13 drive that comes from these companies? How many 14 times have we, have refinery workers and 15 operators and maintenance people seen in 16 turnarounds where exactly what happened here 17 where things are identified as dangerous but then 18 when you get into the turnaround suddenly they 19 disappear, they are pulled off the work scope? 20 It's exactly what happened here. And 21 regulatory steps have failed repeatedly including 22 here, including with Cal/OSHA who came one year

(202) 234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. 136 1 was called in by workers one year before the fire 2 for almost exactly the same problem and nothing 3 was done. It was signed off of. 4 So as a refinery worker I think the 5 most important single thing I had to defend my 6 life and the life of my coworkers was my union. 7 I worked in non union situations and basically 8 you're told either do the job or there's the 9 gate. 10 At least when I had a union I could 11 have some confidence that I could stop that work. 12 I think the next step needs to be that our unions 13 need to step up collectively. We need to step up 14 because I do not believe that the regulatory 15 commissions, the state governments have the power 16 to take on the Chevrons and the Shells of this 17 world. 18 Only the people who actually do the 19 work and create the product and make the money 20 have that power. And that's, I think what is 21 posed if we can have any idea that we're going to 22 stop the deaths that occur, the dispoilization

(202) 234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. 137 1 (phonetic) of our communities. I'm confident 2 that will happen. 3 But that's, forgive me, but I think 4 your recommendations and, you know, as an oil 5 worker sitting here we've all listened to the 6 paragraph after paragraph at work not just here 7 of the things that no one can understand, the 8 verbiage around safety. But the real question is 9 and I'll finish up, when profits versus safety, 10 as it stands today in our world profits will 11 always win. 12 And I think that's what we need to 13 give consideration how we change that. 14 (Applause) 15 MR. HOROWITZ: Next is Alisa 16 Mescariolo (phonetic). No, okay. How about 17 Rebecca Auerbach? 18 MS. AUERBACH: Richmond Resident, 19 Rebecca Auerbach. R-E-B-E-C-C-A, A-U-E-R-B as in 20 boy, A-C-H. Now that this wonderful report has 21 brought the light of day into a company with so 22 little regard for the lives inside and outside

(202) 234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. 138 1 its gates that the automatic response to an 2 obvious hazard is to tell workers to go poke it 3 with a stick, I want to see the follow through. 4 It would be too easy for everybody in 5 this room to take this home and throw it in a 6 corner. And if that happens I know where we're 7 going to be in five years or in ten years or 8 whenever the next fire happens and people do die. 9 And then everybody is going to be down 10 at the coffee shop saying now what was that they 11 said in 2015 about sulfur, what was that word and 12 what were they saying about stop work something. 13 I don't want that day to come. We've had a 14 wonderful start. 15 I want to see it keep going. I call 16 on everybody in this room to follow this through 17 to the end. Thank you so much for coming to 18 Richmond. We're glad to know that we're not 19 alone here. 20 (Applause) 21 MR. HOROWITZ: Okay. Lipo Chantanasuk 22 (phonetic), not here. Is there anybody here who

(202) 234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. 139 1 did not sign up who would like to speak for three 2 minutes? I think that is it, Mr. Chairman. 3 CHAIRPERSON MOURE-ERASO: Thank you, 4 Dr. Horowitz. So we move on our agenda. At this 5 time we'll proceed with a vote to consider the 6 final investigation report of the Chevron 7 refinery accident. 8 I will make a motion that reads as 9 follows. I move that the Chemical Safety Board 10 approve Investigative Report Number 2012031CA 11 entitled, Chevron Richmond Refinery Pipe Rupture 12 and Fire, that occurred in August 6, 2012, in 13 Richmond, California including all findings, 14 recommendations and associated products like 15 videos continue, that are contained in this 16 January 28, 2015, report. 17 That is my motion. Do I hear a 18 second? 19 (Off microphone comment) 20 CHAIRPERSON MOURE-ERASO: I hear a 21 second. Is there any discussion among the 22 Members of the Board on the motion? So not

(202) 234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. 140 1 hearing any discussion I will call the question. 2 I ask the General Counsel, excuse me, record the 3 vote. 4 MR. LOEB: The question has been 5 called. Mr. Griffon? 6 MR. GRIFFON: Yes. 7 MR. LOEB: Mr. Ehrlich? 8 MR. EHRLICH: Yes. 9 MR. LOEB: Mr. Chairman? 10 CHAIRPERSON MOURE-ERASO: Yes. So -- 11 (Applause) 12 CHAIRPERSON MOURE-ERASO: Okay. So 13 there are three votes. It's a unanimous vote and 14 so the report is adopted. 15 (Applause) 16 CHAIRPERSON MOURE-ERASO: As a way of 17 closing remarks on the specifics of the 18 investigation I would like to reiterate that this 19 fire, tragic as it was will, in my view, prove an 20 important milestone in industrial chemical 21 safety. 22 California authorities at all levels

(202) 234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. 141 1 are poised to modernize their process safety 2 rules and put this state at the forefront of the 3 nation's accident prevention efforts. To them I 4 say God speed. I also call upon federal 5 regulators to closely study the progress that is 6 underway here in California. 7 I believe it is a model for the whole 8 country to emulate and will make our communities 9 safer. I also would like to recognize and to 10 express my deeply felt thanks to the entire CSB 11 Chevron team for their tireless work on this case 12 over two and a half years. 13 I know the whole Board joins me in 14 congratulating your efforts. That concludes the 15 discussion of the Chevron investigation and now 16 pursuant to the agenda I ask if there is any 17 other business before the Board during this 18 public meeting. 19 MR. EHRLICH: Mr. Chairman, I have a 20 motion to normalize the government of the CSB, 21 governance of the CSB to approve agency 22 operations in general. Having spent an excess of

(202) 234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. 142 1 50 years in the private sector I look at the CSB 2 from an executive's perspective where lines of 3 authority and a command structure are known to 4 all. 5 First and perhaps foremost, is the 6 fact that the products produced by the staff are 7 outstanding and excellent. The Board continues, 8 consists of remarkably dedicated, extremely 9 bright and exceptionally committed, hard working 10 group of professionals. 11 Looking at the agency's management and 12 administration there are a number of issues that 13 require, in my mind, clarification and 14 solidification. For example, I have never worked 15 in an organization where there is no clear 16 delineation of responsibility for implementation 17 of administrative tasks. 18 In this agency's case it would seem to 19 me that the Chairperson of the Board should be 20 responsible for such administrative issues for 21 all the agency members, including the Board. 22 Complicating matters is the fact that the agency

(202) 234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. 143 1 adopted the majority of its internal procedures 2 or Board orders during a brief period between 3 2000 and 2002 where there was no Chairperson and 4 no permanent staff director at the agency. 5 With regard to Board orders there 6 appear to be too many, most of which deal with 7 purely administrative issues and in my opinion 8 should be eliminated. To the extent standard 9 procedures are needed for such issues as 10 contracting, budgeting and personnel these should 11 be developed by the Chairperson or his delegates 12 and updated on routine basis following government 13 norms. 14 By clearly delineating the 15 administrative issues to the chair and the 16 programmatic responsibilities to the Board then 17 delegating authority is appropriate in both areas 18 I'm of the opinion that the Board would function 19 much more smoothly and more time could be spent 20 on the mission of the agency. 21 My motion has four components. First 22 it adopts a new Board Order, Number 2015-01 that

(202) 234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. 144 1 rescinds numerous unnecessary, conflicting and 2 antiquated Board orders related purely to the 3 agency's administrative functioning. It 4 clarifies that administration is and always has 5 been the Chair's responsibility. 6 That is fully consistent with the 7 statute best practices of other agencies 8 including the NTSB and my philosophy of 9 management based on 50 years of private sector 10 experience. It encourages the Chair to develop a 11 modern, streamline set of management directives 12 covering administration, budgeting and personnel. 13 Second, my motion provides for 14 adopting an updated Board Order Number 22 15 establishing updated procedures for the Safety 16 Recommendations Program. This proposal was 17 developed by the staff but has been waiting at 18 the Board for resolution for more than two years. 19 Third, my motion adopts a new 20 procedure for what is called investigation 21 scoping. That is the critical process for 22 planning out how individual investigations are

(202) 234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. 145 1 going to be conducted and what issues are to be 2 pursued. 3 This will be a new chapter of the 4 Board's investigation protocol. Once again the 5 procedure has been proposed by staff and has been 6 sitting before the Board for a number of months. 7 Finally, my motion would 8 administratively close three very old CSB cases 9 dating from 2009 and 2010 where there is no 10 realistic opportunity to issue a CSB report. 11 These are the investigation of two accidents from 12 2009 at the Silver Eagle refinery in Utah, a 13 series of releases from the Citgo Corpus Christi 14 refinery starting in 2009 and a 2010 zinc fire at 15 the Horsehead facility in Monaca, Pennsylvania 16 which has been closed and demolished. 17 In the case of the Silver Eagle and 18 the Citgo cases the CSB has already issued 19 technical reports or recommendations that 20 establish many findings about the incidents. In 21 the case of Horsehead the CSB staff is contracted 22 with a distillation expert who has reviewed the

(202) 234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. 146 1 file and has prepared technical analysis which 2 should be made available to the public after 3 completion of staff reviews. 4 However, especially with both the 5 plant and the process no longer in existence it 6 would be fruitless to put more researchers into 7 the case. These are the four parts of my motion 8 and I urge that it be adopted by the Board. 9 I move the Board take the following 10 actions to improve and facilitate mission 11 operations, part one. Adopt a new Board Order 12 2015-01 entitled Streamlining of a Chemical 13 Safety Board System of Board Orders. 14 Part two, rescind the existing Board 15 Order 22 entitled CSB Recommendation Program and 16 adopt an updated version of the Board order as 17 recommended by the CSB staff. Part three, adopt 18 a new chapter one of the CSB's investigation 19 protocol, Board Order Number 40 entitled 20 Investigation Scoping Process as recommended by 21 the CSB staff. 22 And part four, terminate the following

(202) 234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. 147 1 CSB investigations. Investigation of the January 2 12, 2009, flash fire and November 4, 2009, 3 hydrogen explosion at the Silver Eagle refinery 4 in Woods Cross, Utah. Investigations of the July 5 19, 2009, hydrogen fluoride release and 6 hydrocarbon fire at the Citgo refinery in Corpus 7 Christi, Texas and a subsequent smaller hydrogen 8 fluoride release on March 5, 2012. 9 Investigation of the July 22, 2010, 10 zinc fire at the former Horsehead Corporation 11 facility in Monaca, Pennsylvania and authorize 12 the CSB staff to make available to the public the 13 final results of a technical review of the 14 Horsehead case file already conducted by the zinc 15 distillation expert. 16 Upon completion of appropriate factual 17 and confidential business information reviews, 18 sorry, and completion of the business information 19 reviews. 20 CHAIRPERSON MOURE-ERASO: So I hear a 21 motion. There is a motion on the floor. Is 22 there a second for this motion? I second the

(202) 234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. 148 1 motion. So there is a motion on the floor that 2 has been read and second. Is there any 3 discussion? 4 MR. GRIFFON: Mr. Chairman, I make a 5 motion to table this matter. 6 CHAIRPERSON MOURE-ERASO: There is a 7 second motion to table this matter. Is there a 8 second for the motion to table the matter? 9 Hearing no second I call the question 10 for the first motion. I will ask if there is any 11 further discussion on this. 12 MR. GRIFFON: Yes, I have further 13 discussion. First and foremost, we have another 14 Board Member who has been confirmed by the Senate 15 and is due to be on the Board in a few weeks. 16 And I think we're basically modifying 17 all governance practices right here live in this 18 meeting when another Board Member that's been 19 confirmed by the Senate I believe should have an 20 opportunity to speak to these very important 21 issues that affect the agency going forward for 22 some time.

(202) 234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. 149 1 Secondly, I've been delivered this 2 document right now. This is the first time I've 3 seen this. There is no way I can vote on this 4 matter with, fully understanding what I'm voting 5 on without some time to look this over 6 completely. 7 And finally, these governance matters 8 have been under discussion on the Board and great 9 debate for several years. That is true. Several 10 of them involve components that, quite frankly, 11 get to this very meeting, which is conducting our 12 business in the public, transparency. 13 And I think the current version of 14 Board Order 22 effectively would, if it was put 15 in place, would involve most of our 16 recommendations, evaluations votes to be done in 17 the private of our offices. And I have been 18 pushing for several years on this Board to have 19 more of that work done in front of the public. 20 The recommendations, where we want to 21 see them through and make sure they happen at the 22 plants, at the communities. And I think that's

(202) 234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. 150 1 totally very important for this Board to be 2 effective. 3 So I urge my colleagues on the Board 4 to at least wait until another confirmed member 5 of this Board is seated and has an opportunity to 6 review this material and debate it fully. Thank 7 you. 8 CHAIRPERSON MOURE-ERASO: So you have 9 a motion to make. 10 MR. GRIFFON: My motion was to table 11 the matter until we have our confirmed member of 12 the Board joins us. 13 CHAIRPERSON MOURE-ERASO: Well your 14 motion as stated requires a second. And I ask 15 again is there a second for that motion? Having 16 heard none I would like to call the question to 17 the first motion presented by Mr. Ehrlich. 18 So there is a motion on the floor by 19 Mr. Ehrlich that has been read and copies of it 20 has been distributed among the Members. And I 21 ask Mr. Loeb, our General Counsel, to proceed 22 then with a vote.

(202) 234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. 151 1 2 3 4 5 6 7 MR. LOEB: Mr. Ehrlich? MR. EHRLICH: Yes. MR. LOEB: Mr. Griffon? MR. GRIFFON: A resounding, no. MR. LOEB: Mr. Chairman? CHAIRPERSON MOURE-ERASO: Yes. . 8 9 CHAIRPERSON MOURE-ERASO: Okay. I 10 guess this ends the business of the Board 11 tonight. Okay. So I forgot to say after I was 12 interrupted that the motion carries 2-1. The 13 motion is approved. 14 So this ends the business of this 15 public meeting. Thank you very much for all of 16 you to be here. 17 (Whereupon, the above-entitled matter 18 went off the record.) 19 20 21 22

(202) 234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. (202) 234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. 152 A $117,168 82:2 $96,394 82:2 A-C-H 137:20 A-U-E-R-B 137:19 ability 17:9 51:14,16,19 52:16 129:9,13 able 19:17 58:11 81:9 81:12 95:22 97:3,4 above-entitled 90:9 151:17 absolute 115:20 116:5 absolutely 131:20 accepted 69:12 accepting 131:3 access 38:20 accident 4:10 5:1,21 24:17,20 66:7 74:1,4 74:7 83:22 84:1,1 97:11 101:22 108:10 139:7 141:3 accidental 65:5 75:13 75:20 81:16 accidently 94:9 accidents 3:21 4:2,9 8:5 10:19 44:12 68:8 68:22 95:12 122:12 135:2 145:11 accountability 42:3 50:16,21 55:12 61:4 61:14 accountable 61:5 110:7 111:7 accounting 66:8 accumulate 59:13 accurate 95:7 achieved 117:8 achieving 93:21 acknowledge 72:8 75:16 103:21 acknowledgment 9:5 act 112:17 120:18 127:12 action 26:15 33:3 43:17 79:1 actions 5:21 6:1 11:16 32:11 34:14 40:9 47:16 63:11 73:18 85:5,7 86:16,17 95:16 95:17 146:10 active 119:22 activist 129:3 activities 14:5 22:5 32:18 69:22 70:12 activity 34:1 52:16 57:14 70:22 actual 35:2 56:1 ad 84:8,13 93:7 add 10:5 17:20 121:9 123:18 added 80:12 addition 22:18 34:17 37:10 53:2 68:7 additional 40:16 53:4,4 58:6 88:13 address 8:6 16:8 58:9 73:2 79:1 80:8 84:15 84:21 90:5 93:12 111:15 119:19 133:3 addressed 76:22 addressing 46:10 64:7 84:5 adequate 18:18 38:6 adjacent 36:19 adjournment 2:22 12:20 administration 75:2 142:12 144:4,12 Administration's 114:14 administrative 66:22 142:17,20 143:7,15 144:3 administratively 145:8 adopt 10:2 24:3 146:11 146:16,17 adopted 6:12 23:13 73:11 75:16 77:19 92:10 140:14 143:1 146:8 adopting 22:10 144:14 adopts 66:20 143:22 144:19 Adrian 72:13 advanced 70:4 advances 24:4 advice 17:15 63:1 advising 111:5 Advisory 65:20,22 affect 148:21 afternoon 3:4,5 25:1 agencies 70:2,20 71:3 79:15 80:13,14 81:5 85:12 91:21 92:15 144:7 agency 3:20 23:11 70:5 86:14 129:8 141:21 142:21,22 143:4,20 148:21 agency's 142:11,18 144:3 agenda 11:4,21 20:2,5 63:9 90:3,3,13 139:4 141:16 aging 114:21 ago 73:4 83:1 106:5 agree 109:15 115:19 agreement 11:1 116:4 agrees 109:10 ahead 91:9 123:15 air 18:18 27:6 110:15 120:22 124:20 125:8 AJ 120:9 ALARP 75:14 76:2 Alcaraz 120:11,11,12 120:13 alert 42:19 Alisa 137:15 alliances 100:6 allow 11:3 52:1 allowed 67:12,15 74:22 allowing 127:16 allowment 107:9 Alloy 37:18 41:1 alloys 37:4 alternative 15:11 30:3 96:22 alternatives 48:7 Amanda 20:14 ambulances 131:4 amended 92:5 amending 77:2 amendments 73:11,14 74:9 75:15,16 American 7:7,7 36:9 38:8 39:7 41:13 Americans 125:21 amount 94:18 123:4 Anacortes 135:4 analysis 6:20 23:7 31:4 39:1 45:12,18 46:2,6 46:12 47:7,10,18 48:6 48:8 52:7 53:20 66:6 66:16 73:16,18,19 74:5,12 77:8,9,11,13 79:9 83:18 96:18 109:11 113:19 146:1 analyze 46:12 analyzed 7:2 Andres 102:7 Angie 94:13 angles 121:17 animation 24:19,21 30:8 99:7 100:17 103:3 annual 82:1 83:11 answer 53:7 answered 18:5 anticipated 67:1 antiquated 144:2 anybody 12:6 128:19 138:22 anyway 122:13 apart 119:9 API 36:14,21 37:9,10,12 37:14,15,17 38:7 39:12,18,22 40:4,13 40:14,19,22 41:7,9,10 41:18 45:17 60:2 84:2 appear 48:22 143:6 appeared 25:4 appears 95:21 Applause 10:10 94:7 98:17 100:22 102:5 103:19 104:5 107:22 109:5 111:2 115:3 116:13 118:2,10 120:6 125:12 127:19 130:5 132:3 134:12 137:14 138:20 140:11 140:15 applicable 19:3 apply 19:20 92:11 appreciate 85:6 91:16 93:5 103:18 115:10 115:16 116:11 126:6 128:10,22 129:12 appreciated 93:18,19 appreciative 99:1 apprenticeship 120:21 122:9 approach 49:22 60:4 approaches 15:9,11 appropriate 18:19 143:17 147:16 approval 21:4 42:17 67:1 approve 139:10 141:21 approved 5:12 14:18 69:7 77:15 115:2 151:13 approves 113:19 approximately 28:9 29:4 April 16:21 23:3 29:2 32:22 area 4:21 35:18 49:13 59:18 91:3 100:15 108:19 122:6 124:20 125:7 126:16 131:18 areas 78:9 94:22 143:17 arguably 62:12 argue 132:17 arrived 91:9 Asia 104:14 asked 5:8 7:12 16:8 93:9 105:13 112:13 119:5 asking 21:3 asks 57:20 107:16 ASME 41:14,15

(202) 234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. 153 aspects 4:1 50:18 92:21 assembled 26:20 assess 26:5 36:3 58:20 assessing 92:21 assessment 43:18 67:3 67:7 92:16,18 assessments 66:5 assigned 23:4 assistance 71:5 associated 139:14 Association 130:11 assumed 28:16 assure 95:17 atmosphere 58:14 Atomic 132:10 attempt 17:21 attempted 27:12 Attempts 35:7 attendance 19:12 attention 14:12 15:17 59:16 audible 42:8 audience 31:8 audio 1:22 audit 79:12 auditing 70:14 audits 80:20 Auerbach 137:17,18,19 August 8:15 14:15 16:18 22:11 24:22 32:3,12,14,18 64:8,13 106:4 139:12 authored 9:18 authorities 5:8 140:22 authority 33:14,20 45:10 51:7,8,16,22 74:19 97:6 108:8 115:17,21 116:5 133:10 135:11 142:3 143:17 authorize 147:11 automated 121:19 automatic 123:3 138:1 automation 122:15 available 31:8 58:20 59:6 84:2 146:2 147:12 average 29:6 114:15,18 averaged 68:21 69:1 averaging 69:2 averts 110:13 avoided 102:1 Avoiding 36:10 39:12 aware 18:13 60:14 92:1 130:22 awareness 39:20 40:15 B B 132:6 B-R 125:17 back 10:1 13:3,18 51:12 52:5 84:11,15 90:18 91:5 93:10 101:9 104:21 117:18 121:17 121:19 128:19 130:1 backed 27:4 Baker 53:14,15 bargaining 116:4 barrels 29:6 67:8 bartered 129:18 base 82:1 based 38:22 55:17 56:8 57:11 58:12 65:12 67:8 87:21 109:19 144:9 basically 54:18 56:13 76:19 77:12,21 79:16 81:9 84:4 92:20 101:12 136:7 148:16 basis 54:21 83:11,11 143:12 Bates 72:3 Bay 108:19 122:22 124:20 125:7 126:16 131:18 Beckles 72:4,21 100:1 beds 131:7 began 27:3 behalf 104:12 behavior 117:11 behold 119:7 believe 25:20 31:7 47:9 59:7 62:15 64:2 72:1 72:5,7 89:20 94:13 98:8 101:14 102:22 117:7 132:22 133:3 136:14 141:7 148:19 believed 25:19 believes 96:16 109:12 beneath 26:21 benefit 9:6 58:16 best 10:3 42:5 93:13 144:7 better 9:12 18:11 60:8 75:2 81:8 106:18,18 124:10 beyond 83:14 109:16 112:15,18 124:15 133:1 big 57:2 95:19 bigger 133:4 bill 1:19 2:14 63:22 71:9 87:7,11 89:6,6 billion 128:17 billions 114:11 128:18 129:6 bit 51:11 80:19 85:1 104:7 133:1 135:6 BK 116:14,17 black 4:19 blending 29:9 blow 124:11 board 1:1,9,11,12,13,22 2:10,20 3:6,8,9,10 5:12 11:6,12 12:1,19 13:14 14:19,19 16:10 16:21 19:17 20:3 21:8 21:21 22:9 39:2 43:1 43:7,22 44:3 48:10 55:10 64:5 66:15,18 66:20 71:13 75:12 76:15 81:11 84:20 90:5,22 91:3,5,8,11 93:8,20 98:22 99:4 102:9 104:2,18 108:5 109:9 115:7 126:4 129:8 133:8 134:21 139:9,22 141:13,17 142:7,19,21 143:2,5 143:16,18,22 144:2 144:14,18 145:6 146:8,9,11,13,13,14 146:16,19 148:14,15 148:18 149:8,14,18 150:1,3,5,12 151:10 Board's 8:14 64:7 84:8 145:4 body 100:11 bomb 114:20 bosses 133:6 bottom 106:8 125:11 132:20 boy 132:7 137:20 BP 21:7 53:13,16 62:20 break 12:3,4 90:7,8,12 breather 90:7 brief 110:3 143:2 briefly 29:1 90:10 bright 142:9 Brightman 125:14,15 125:16,17,19 bring 82:1 100:9 102:11 120:16 126:1 127:11 128:19 bringing 14:12 126:8 Britton 132:5,5,6 broad 97:5 broken 99:12 125:10 Brother 118:4 brought 59:15 100:17 126:20 127:3,13 137:21 Brown 64:14 budget 17:18 budgeting 143:10 144:12 build 127:10 built 132:21 business 17:12 141:17 147:17,18 149:12 151:10,14 busy 89:17 Butt 71:22 C C 1:15 3:1 C-I-T-R-O 118:16 C-L-A-U-D-I-A 118:16 Cal 79:18,18 82:19 Cal/OSHA 1:19 2:13 11:19 15:4 22:3 63:16 66:13 70:3 79:17 80:6 80:14 81:1 87:15 112:17,17 120:13 135:22 Cal/OSHA's 64:11 67:7 CALARP 65:6 70:6 calendar 69:16 California 4:15 5:19 6:4 6:14,15,16 14:1 15:2 15:12 22:12 23:4,10 23:19,20 24:10 43:2,4 43:8,9 46:9 64:1 65:5 71:10 79:18 81:16 86:20,22 87:14 89:9 92:12 126:15,19 128:5 130:10 132:11 139:13 140:22 141:6 call 5:4 50:8 63:10,10 71:8 76:10 77:7 83:6 90:13 99:17,18,21 121:22 138:15 140:1 141:4 148:9 150:16 called 6:7 25:18 53:14 64:22 77:12 78:7 88:9 89:6 109:22 120:19 121:3 136:1 140:5 144:20 calling 14:6 100:4 calls 5:14 calm 58:13 Camilla 119:5 campaign 124:4 cap 107:5 capabilities 7:1 capacity 114:10 carbon 30:1,13,14 36:17 37:3,8 39:15 40:2,18 41:3 care 9:3 105:10 cared 130:14

(202) 234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. 154 careful 96:18 Carlton 97:15 carries 151:12 case 13:4 16:6 38:16 86:17 98:9 141:11 142:18 145:17,21 146:7 147:14 cases 51:12 68:5 125:5 145:8,18 catalyst 14:3 86:9 catastrophic 22:13 34:11 35:16 38:18 39:15 40:1,17 58:21 59:2 110:12 126:18 catastrophically 29:3 categories 30:21 cause 22:21 66:6 74:5 107:7 117:8 caused 4:20 26:18 49:11 129:15 causes 4:2 29:17 34:13 91:18 CBE 102:7 109:7,10 112:18 CCPS 50:17 cell 13:11 center 50:17 55:20 130:13 131:1 certain 107:10 certainly 46:4 55:6 57:7 62:15 75:9 95:6 113:15 certificate 104:2 Certified 70:5 cetera 46:1 62:5 102:1 133:19 chair 71:11 102:8 115:6 143:15 144:10 Chair's 144:5 chaired 91:3 Chairman 13:17 14:18 19:9 20:7 44:2 45:2 48:13 49:17 63:6 76:14 90:18,21 98:22 109:8 117:2 139:2 140:9 141:19 148:4 151:5 Chairperson 1:10 2:3 3:3,7 10:11 19:7 20:1 44:4 48:9 49:15 63:8 71:7 76:9 84:17 85:14 86:2,12,13 87:9 89:18 90:11 91:7 94:6 97:13 102:4 103:20 118:3,7 139:3,20 140:10,12 140:16 142:19 143:3 143:11 147:20 148:6 150:8,13 151:6,9 challenges 16:9 chambers 10:8 Chan 120:8,8 change 10:2 45:12,13 45:18 46:3,5 47:5,11 47:19,19,22 48:6 73:20,21 74:2,6 121:13,16 125:2 135:12 137:13 changed 80:8 changes 45:19,21,21 46:6 48:1 66:2,17,21 75:8 92:7 changing 125:10 Chantanasuk 138:21 chapter 145:3 146:18 characteristics 39:21 40:16 charge 133:5 charged 74:18,19 charges 126:20 chart 60:11 61:19 charter 3:22 cheaper 97:10 check 25:2 chemical 1:1,9,11,11 1:12,22 3:6,21 4:2,10 7:3,4 8:14 19:20 20:3 50:17 64:7 67:17 71:12 74:1,3,7 75:12 91:5,11 99:20 132:10 133:8 134:20 139:9 140:20 146:12 Chevron 1:3 4:14 5:4 6:21 8:16 10:14,15,21 11:9 13:22 14:15 16:22 17:3,21 20:10 20:12 21:15 22:6,11 22:15 23:9 24:19 25:11 26:13 27:12 29:22 31:10,15 32:19 33:13,16 34:2,7,16,20 35:11,19 36:1,7 42:1 42:2,4,17 43:20 44:9 45:4 46:8,18 47:4 49:19 50:2 53:9,21 54:3 57:17 61:15 64:8 64:13 69:20 78:3,6 80:3 82:11 84:10 91:21 92:16 95:3 98:1 103:12 105:6,8,15,19 106:6,14,17 107:7 110:22 112:4 114:16 115:14 116:3 117:9 119:3,4 122:9 128:15 128:18 131:19 132:8 133:7 139:6,11 141:11,15 Chevron's 17:15 18:9 25:22 32:7 55:20 100:20 113:22 Chevrons 136:16 chief 72:12 children 106:11 Christi 145:13 147:7 Christopher 7:15,20 Chrome 30:17 chromium 30:4 circuit 31:19 59:9 circuits 37:3 41:3 56:5 circulated 99:8 circulating 12:6 circumstances 9:16 cited 46:1 52:13 Citgo 145:13,18 147:6 cities 119:21,21 120:4 citizens 119:8 Citroen 118:15,15 CITRON 118:16 city 1:19 2:14 5:20 7:9 11:20 15:2,5 21:7 22:3 23:9 43:3,8,9 46:10 53:13 62:20 63:22 64:1 71:9,10,13 71:21 72:18 73:1,10 75:6 76:20 80:9 82:6 82:6,15 91:20 92:4,12 97:16,20 100:1 101:8 101:13 105:2,11,18 111:5 118:20 119:4,6 119:8 135:3 city's 74:15,18 75:18 clamp 26:12 clarification 142:13 clarifies 144:4 clarity 124:9 class 108:14,20 Claudia 118:14 clean 21:8 121:8 clear 102:17 142:15 clearly 103:8 110:7 143:14 climbed 27:8 clipped 127:2 close 18:15 25:14 93:15 145:8 closed 145:16 closely 72:9 74:21 75:1 76:16 77:17 80:6 141:5 closing 2:22 140:17 closure 131:4 cloud 22:16 27:5,20 28:2,6,10 Clyde 1:19 2:13 63:15 64:10 Code 37:13 40:13 codes 31:2 36:7 37:6,9 38:9 coffee 138:10 coking 114:10 colleagues 86:15 150:3 collect 71:1 collective 116:4 collectively 136:13 combustible 25:10 come 12:7 81:12 96:13 99:4 102:11 105:8 107:6 109:1 115:11 116:10 117:17 125:22 131:9 138:13 comes 48:15 115:21 121:22 131:20 135:13 comfortable 33:22 coming 10:1 71:13 89:11 91:5,11 94:3 105:11 126:8 138:17 command 34:8,19 48:22 49:3 142:3 commander 35:15 59:16 commands 34:12 commend 85:11 126:8 comment 2:18 12:7,14 48:14,15 66:19 85:4 86:6 90:20 94:11 139:19 commenter 90:21 comments 10:21 12:5,8 12:12 48:11 Commission 98:3 Commission's 129:18 Commissioner 97:21 commissions 136:15 commits 15:20 committed 142:9 committee 9:22 43:12 43:15 65:20,22 72:19 77:18,18 84:9,13 92:13 93:8,11 100:4 104:13 105:19 128:6 committees 54:15 60:9 62:3 common 22:22 29:18 83:6,16 127:4 communicated 34:18 communities 19:5 101:4 110:14 111:16 133:21 137:1 141:8 149:22 community 9:3,13,16 18:17,20 22:19 43:14 65:12 75:7 91:14 92:14 93:18 94:5

(202) 234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. 155 98:10 99:15 100:7 101:3 102:12,16,19 103:12 105:1,10 106:9,10 107:16 108:7,20 109:19 112:19 117:15 126:7 126:9 127:13 128:11 128:14 130:2 132:2 companies 110:6 111:21 135:13 company 10:21 43:13 57:15 137:21 compared 30:16 69:11 compensation 81:8,13 complain 106:1 complaint 69:17 112:16 complaints 68:8 69:1 complete 68:13 completed 52:22 69:6 73:10 93:1 121:19 completely 5:17 149:6 completion 146:3 147:16,18 compliance 67:16,21 68:1,5,14 69:5 70:7 70:21 Complicating 142:22 comply 89:13 105:15 complying 69:10 component 29:14 31:18,20 32:2,9 37:1 37:16 54:8 components 36:20 37:2 41:5,8 56:6 143:21 149:10 composition 45:13,22 compounds 29:20 comprehensive 36:12 69:9 117:5 comprised 43:12 concentrations 36:18 concern 51:6 96:14 concerned 48:19 concerning 6:6 concerns 16:9 34:4 52:10,18 64:20 concludes 43:19 141:14 concluding 4:15 conclusion 116:10 conclusions 92:22 concrete 53:2 conditions 34:17 133:11 conduct 45:17 47:4,18 conducted 11:13 33:15 47:17 52:12 68:6,15 68:18 69:17 89:3 92:19 145:1 147:14 conducting 41:20 46:2 67:20 149:11 conductor 122:6 confidence 52:15 136:11 confident 137:1 confidential 147:17 confirm 78:1 confirmed 148:14,19 150:4,11 confirming 100:12 conflicting 144:1 conform 74:16 75:1 congratulating 141:14 Congress 129:11 Congressional 9:21 Congressman 7:16,21 8:2 10:7 16:20 17:7 connect 17:9 consequences 52:3 96:4 consider 14:6 44:19 139:5 consideration 16:6 21:3 92:10 137:13 considerations 17:19 considered 15:16 44:21 59:15 consisted 65:19 consistent 38:6 40:14 83:8 144:6 consists 20:13 142:8 constituents 8:5,10 constraints 68:4 constructed 30:1 construction 30:3,12 30:20 31:21 46:14 47:13 112:1 contain 41:5 contained 25:10 139:15 containing 30:4 contains 36:17 content 44:16,19,20 46:15,20 47:2,20 114:15 CONTENTS 2:1 context 116:8 continue 9:13 15:10 20:4 50:10 63:9 79:10 79:11 80:7 90:3,12 118:8 132:1 135:2 139:15 continued 26:19 32:16 33:10 80:17 continues 129:16 142:7 continuing 23:14 94:2 103:5 continuity 51:3 continuous 24:7 124:14,15 continuously 43:4 Contra 1:20 2:15 5:19 7:8 8:1,8 11:19 15:2,4 22:3 23:10 43:2,6,7 45:5 46:9 63:21 70:8 74:17,17 76:12 90:22 92:4 93:19 113:14 115:15 128:1 contract 111:1 134:1,1 contracted 145:21 contracting 143:10 contractors 89:7,9,11 89:16 contrast 68:13 contributed 16:18 34:10 control 36:16 38:11 133:11,13 controls 24:6 66:4 convened 65:9 convincingly 133:9 cooler 35:2 cooperated 10:17 cooperation 10:18 80:11,17 81:4 95:3,6 coordinate 65:2 coordinated 70:14 coordinating 70:10 128:6 coordination 65:7 69:21 70:12 Coordinator 7:16,22 copies 150:19 copy 10:6 80:19 corner 138:6 cornerstone 17:1 corporate 53:9 54:3,10 63:1 132:20 corporation 17:9 42:1 53:12 101:15 117:22 147:10 corporations 129:5 Corpus 145:13 147:6 correct 56:3 59:17 corrective 47:16 corrode 30:11 36:18 corrodes 30:1 corroding 112:5 corrosion 5:6 22:22 25:13 29:16,17 30:7 31:13,17 36:11,16 37:5,9,11,21 39:10,13 39:21 40:11,15 41:4 44:18 45:1,11,19,22 48:3 54:7 56:4 59:3 59:14 61:7 78:17 99:17 113:6 corrosive 111:13 cost 54:22 55:5 133:14 133:15,17 Costa 1:20 2:15 5:19 7:9 8:1,8 11:19 15:2,4 22:3 23:10 43:2,6,8 45:6 46:9 63:21 70:8 74:17,17 76:12 90:22 92:4 93:19 113:14 115:15 128:2 Council 7:9 43:3,9 71:21 72:2,3,3,4,6,20 73:10 97:16,20 100:1 101:8 105:3,12 128:2 129:19,20 Counsel 1:15 3:12 140:2 150:21 Counties 70:8 country 6:17 8:13 85:9 85:22 92:8 113:15 114:5 141:8 county 1:20 2:16 5:19 7:9 8:1,8 9:19 11:19 15:2,4 22:3 23:10 43:2,6,8 45:5,6 46:10 63:21 72:21 73:1 74:17,18 75:20 76:12 80:10,12 82:15 90:22 91:20 92:5,12 93:19 100:3 105:18 111:5 113:14,18 114:3 115:15 128:2 130:20 county's 76:20 couple 50:9 60:18 97:15 104:13 106:5 107:14 123:22 course 44:13 86:13 99:8 103:13 125:18 126:1 court 112:19,21 cover 11:3 83:4 covered 6:19 44:8 69:4 73:17 78:10 83:8 covering 144:12 coworkers 49:7 136:6 crackers 114:12 craft 8:10 create 59:18 136:19 created 43:17 51:21 101:22 creating 98:9 credit 5:18 criminal 126:20,21 criminals 127:4 criteria 32:7 56:14,21 57:2 58:11,13

(202) 234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. 156 critical 90:1 112:7 131:8 144:21 cross 30:9 70:13,13 147:4 crude 22:14 24:22 26:10 27:18 29:5,7,8 29:18,20 44:17 47:20 47:22 48:1 107:5,6,6 110:9 111:20 112:10 112:20 113:5,10 114:1 131:18 CSB 1:16 2:6 3:6,12,14 3:19 4:11,15,22 9:13 9:22 10:17 15:18,20 22:15 23:1,8,17,20 24:9 26:17 31:6,10 32:4,13 33:11,21 34:7 35:3 36:8 37:6 38:1,4 39:11,17 40:3,8,12,21 41:6,12,14,22 42:2,7 42:16 45:3,15 51:11 53:11,13 71:5 72:10 72:19 86:8 99:1 104:18 116:20 141:10 141:20,21 142:1 145:8,10,18,21 146:15,17,21 147:1 147:12 CSB's 8:18 11:1 20:7 20:12 23:12 28:22 29:2 43:19 73:2 146:18 cultivated 103:1 culture 6:22 8:20 17:2 18:9 31:1,10 32:15 33:15 43:5,18 49:20 50:2 51:6 52:9 53:15 53:19 57:8 66:5 92:16 92:21 103:11 CUPA 70:6 current 14:22 52:10 58:3 72:6 149:13 currently 52:6 92:18 126:2,14 Cutcheon 20:15 cuts 120:4 D D 3:1 damage 23:1,6 34:9 37:14 39:19 58:1 59:1 66:5 77:22 78:2,9 79:8 101:21 damaged 29:15 Dan 20:13 danger 4:18 99:13 131:13 dangerous 26:15 99:20 102:21 132:15,16 135:17 Daniel 1:16 21:13 44:3 90:14 data 55:18,18,21 56:1,2 56:8,9 70:19 114:15 database 42:21 date 23:1 98:7 dating 145:9 day 29:6 33:20 34:19 35:5,11 106:3 109:20 109:20 137:21 138:13 days 33:6 88:3,12 dead 28:16 deadly 23:14 deal 17:21 21:15 103:5 143:6 dealing 45:13 50:22 87:11 deals 89:7 dealt 45:3 death 22:18 deaths 8:9 136:22 debate 149:9 150:6 decade 23:16 112:14 decades 112:5 December 106:4 decide 58:11 decided 26:8 deciding 35:21 50:10 decision 17:17 18:2 27:17 32:13 33:9 50:13,15 54:22 56:2,3 57:21 58:10 59:6,8 60:21 63:5 96:20 101:11,13,14 112:21 114:4 120:1 decisions 55:8,14,16 55:18,22 57:11 58:15 59:17 61:5 100:13 declining 52:14 decrease 44:20 dedicated 142:8 deemed 26:15 deep 21:9 deeply 8:17 50:7 141:10 defend 136:5 defer 88:10 deferred 42:11,12 88:6 88:13,21 defined 24:3 definitely 85:21 100:2 degree 29:4 107:10 121:16 degrees 25:9 35:1,2 67:18 78:18 107:12 delegates 143:11 delegating 143:17 delineating 143:14 delineation 142:16 delivered 149:1 delve 55:7 demand 108:8 Democracy 103:13 demolished 145:16 demonstrated 102:17 133:17 demonstrates 134:6 demonstrating 30:9 denied 42:11,12 dense 28:5 department 1:20 2:16 6:5 34:20 67:5 77:15 82:20 departments 80:13 81:2 depending 30:11 depicting 24:19 deployed 20:18 depressing 135:4 DeSaulnier 7:17,22 8:2 10:7 described 28:17 65:16 design 4:3 23:5 30:18 74:8 designed 4:8 desk 63:14 despite 32:16 33:10,20 38:17 detail 76:4 detailed 54:15 61:19 71:18 99:2 determination 38:15 determinations 56:15 80:20 determine 35:15,17 133:18 determined 22:15 23:20 38:1 determining 36:3 develop 5:9 40:5 42:3,8 42:17 57:18 58:8 73:2 83:13 144:10 developed 35:4 41:19 49:1,2 58:13 103:1 143:11 144:17 developing 36:2 69:21 development 43:11,16 47:15 70:18 73:18 86:19 92:15 100:3 deviance 50:8 diagram 60:8 dialogue 14:3 89:2 diameter 59:10 dictates 132:21 die 8:5 105:11 132:18 132:19 133:12 138:8 died 111:19 128:20 diesel 25:11 different 47:21 51:20 73:8 78:10 79:15 81:4 82:8 107:13,14 113:11 difficult 19:19 Dina 123:8 DIR 65:9,14 66:13 67:4 67:6,12 70:10 DIR's 65:16,20 direct 44:6 62:21 direction 121:13 directions 121:16 directives 144:11 directly 26:20 44:16 57:21 58:10 director 1:16,16 2:7 11:7 20:4,8 63:20 76:11 90:14 93:9 125:20 143:4 dirtier 114:12,21 dirty 107:6 121:7 127:12 disappear 135:19 disappoint 86:5 disappointed 8:17 disaster 49:13 110:5 disasters 110:1 discovered 40:8 discuss 11:15 14:17 15:21 37:11 42:14 63:11 70:11,17 116:8 118:21 discussed 5:5 23:13 26:6 54:4 discusses 15:8 discussing 45:9 discussion 2:12 6:2 12:19 16:3 51:8 65:17 90:15 96:16 139:21 140:1 141:15 148:3 148:11,13 149:8 dispoilization 136:22 disregarded 98:6 distillation 25:4,17 27:22 29:5,7,19 145:22 147:15 distributed 150:20 district 63:15 64:11 110:16 124:21 125:8 disturbed 13:12 division 69:6 Doctors 130:13,22 document 32:7 36:15 56:13 61:10 149:2

(202) 234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. 157 documented 23:5 112:13 133:9 documents 37:20 55:16 doing 45:12 72:18 77:7 80:22 97:2 98:13,14 111:8 112:11 118:8 119:12,12 124:20 dollar 133:15 dollars 128:17,18 129:6 Don 1:16 2:7 20:22 111:17 Donald 20:8 doors 13:4 doubled 114:10 doubt 24:16 58:2 dozen 57:20 Dr 20:5,6 90:14,15,17 94:8 97:14 98:16,18 139:4 draft 21:4,19 22:1 31:5 44:1 73:8 drafted 6:5 dramatically 113:6 draw 15:17 drifting 4:19 dripping 25:5 drive 135:13 driven 17:18 55:18 driver 54:22 driving 54:22 due 25:13 29:15 31:12 36:18 83:17,18,19,20 148:15 dumping 110:18 DuPort 20:20 duties 43:15 E E 3:1,1 E-D 97:19 E-L-L-I-O-T 108:4 E-L-Y 94:17 E-N 118:17 Eagle 145:12,17 147:3 earlier 8:19 84:14 91:21 93:8 104:15 107:9 early 114:8 Earth 126:22 easy 138:4 echo 85:18 86:14 102:9 129:14 131:15 economic 66:16 economy 9:17 Eduardo 72:4 97:18,19 Education 9:21 effect 48:2 67:2 124:13 effective 18:18 36:12 42:4 77:9 78:1 150:2 effectively 23:21 31:11 32:2 34:8,18 40:10 124:9 149:14 effectiveness 66:10 69:14 effects 131:20 effort 99:3 efforts 3:16 8:15 87:4 93:17 141:3,14 Ehrlich 1:11 2:4 3:11 19:8,9 20:2 48:11,13 49:16 85:15,17 140:7 140:8 141:19 150:17 150:19 151:1,2 eight 25:5 either 31:17 32:11 36:22 67:17 136:8 El 132:8 elected 129:20 electronic 70:18 element 50:20 62:13,17 68:9 69:10 elements 66:12 elevate 42:14 eliminate 6:10 eliminated 143:8 Elliot 108:2 emergency 6:22 13:4 18:13 21:17 27:18 31:1 34:6,14 35:14 48:17,21 49:6 57:14 58:15 79:19 95:9 131:2,7 emission 124:22 emissions 124:16 emphasis 96:9 117:10 employee 42:6 66:11 95:4 employees 6:12 9:1 22:16 33:13 34:3 38:22 employers 6:10 empowers 119:21 emulate 141:8 encountered 106:5 encourage 5:9 encouraged 33:9 encourages 51:22 144:10 endangerment 35:9 endorse 117:12 ends 151:10,14 energy 21:8 114:14 enforced 102:22 133:13 enforcement 65:7 69:22 70:11,12,22 enforcing 74:19 engine 28:12 engineer 129:1 engineering 67:17 69:13 82:9 engineers 7:8 26:4 38:8 41:14 52:14 81:15 engulfed 22:16 28:13 engulfing 28:3 enhance 24:10 enhanced 64:16 69:21 enormous 128:16 enormously 99:6 ensure 24:7 35:19 42:5 55:13 66:10 entail 69:8 enters 121:8 entire 108:18 141:10 entitled 139:11 146:12 146:15,19 entrances 13:3 entranceway 10:8 environment 9:17 51:21 95:21 environmental 23:11 78:7 104:14 117:13 EPA 14:6,9 70:7 79:18 80:14 81:1 82:19,19 equipment 4:3 29:21 34:5 37:15 39:19 41:16 47:22 83:21 equivalent 76:1 77:14 77:16 Eric 118:12 erroneously 34:21 escape 28:5,16 escaped 9:1 22:17 especially 44:9 89:22 91:16 115:16 146:4 essential 38:21 establish 39:14 41:2 145:20 established 23:22 41:10,18 56:22 75:11 92:13 establishing 57:1 144:15 establishment 65:1 69:4 establishment's 69:9 69:11,14 et 46:1 62:5 101:22 133:19 eternal 103:14 evacuate 13:6 evacuated 49:12 evaluate 35:15 evaluated 95:15 evaluation 38:15 69:9 evaluations 149:16 evening 6:2 7:19 8:3 19:10 71:22 72:2,11 76:8 91:1 102:8 115:6 116:16 120:12 125:16 evening's 11:4 event 49:6,6 110:13 114:19 events 24:17 eventual 18:12 eventually 28:19 44:17 everybody 3:4 109:1 138:4,9,16 evidence 59:14 evident 10:19 exacerbated 34:15 exact 27:9 exacting 97:22 exactly 135:16,20 136:2 examine 4:1 64:15 examined 15:15 examines 16:19 example 6:3 51:17 53:11 61:6,9 124:12 142:14 examples 33:8 60:19 excellence 17:1 excellent 71:18 95:1 109:11 142:7 exceptionally 142:9 excess 141:22 excited 119:17 excuse 91:8 140:2 executive 14:5 85:19 108:5 125:20 executive's 142:2 exemplary 85:6 exercise 51:2,16 52:2 116:1 exercising 51:19 134:7 exert 129:7 existence 146:5 existing 37:18 41:1 57:15 73:17 89:3,13 146:14 exit 13:3 exits 13:10 expand 67:13 77:4,4 80:19 expanded 27:20 expanding 80:22 expensive 97:8,9 experience 48:16 51:11 81:10 95:9,12 133:16 144:10 experienced 21:7 22:12 45:1 expert 145:22 147:15 expertise 17:10 58:20

(202) 234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. 158 62:14 99:5 119:10 explain 33:19 explanatory 99:10 explicitly 66:8 explosion 4:13,18 9:2,4 126:18 147:3 explosions 135:2 express 141:10 expressed 11:1 extensive 6:6 78:8 93:17 extent 6:11 56:3,4 75:21 143:8 extraction 112:7 extremely 29:15 142:8 Exxon 122:21 F F-R-E-I-W-I-R-T-H 134:16 faced 18:14 120:13 facilitate 80:11 90:15 146:10 facilitated 3:17 facilitation 70:18 facilities 3:22 15:10 37:2 74:9 83:4,8 88:8 facility 16:4 19:3 20:20 36:13 40:6 62:22 73:22 83:13 145:15 147:11 fact 46:8,18 48:15 55:3 55:18 56:1 57:19 59:9 74:17 106:2 111:12 142:6,22 factor 57:3 factors 46:16 47:4,12 48:2 52:6 66:9 facts 59:13 factual 147:16 Fahrenheit 25:9 35:1 failed 29:3 31:19 32:3 32:10 112:6 135:21 failing 38:14 117:8 failure 17:14 25:15 35:17 40:11 45:8 54:6 54:13 59:3 failures 16:17 18:8 31:12 36:11 39:13 fall 107:4 familiar 24:16 family 106:11 far 68:16 103:9 112:22 124:13 farther 129:21 faster 30:2 36:19 121:6 fatalities 20:20 28:20 FCC 112:8 Fe 132:9 fear 52:2 134:6 feasible 6:11 75:21 February 64:20 federal 3:20 15:20 16:1 70:1,7,19 72:22 111:6 141:4 feed 29:10,20 44:21 45:14,19 46:20 59:11 111:13 112:1 feedback 65:18 feeding 44:17 feel 28:7 49:7 75:22 77:19 96:12 97:3 99:13 feelings 86:14 feels 96:17 feet 25:6 28:3 121:22 fell 103:9 fellow 13:14 felt 95:2 141:10 FEMALE 151:7 field 67:22 fight 117:22 133:5 134:11 Figure 60:6 file 146:1 147:14 filed 10:22 112:16 files 61:20 fill 82:13 119:3 filtered 102:13 final 2:20 4:12 5:2 6:18 7:6 11:9 13:18 14:15 16:14 19:1 20:9 21:14 22:1,10 28:22 30:22 31:5 42:22 43:19 64:8 80:20 84:7 93:3 113:19 139:6 147:13 finally 22:9 24:7 27:17 33:6 36:7 38:4,19 145:7 149:7 find 19:15 120:3 finding 115:16 116:20 findings 2:6 8:15,20 9:5 10:2 11:2 13:20 18:22 20:9,16 21:2,13,15,19 24:14 28:22 29:1 30:22 31:3,4,10 34:6 36:8 39:1 43:18 52:20 53:5,18 54:1 55:7,20 65:14 79:2,7 93:2 102:12 115:11 116:9 117:10 139:13 145:20 fine 94:10 fingers 125:3 finish 137:9 finished 90:12 103:22 fire 1:3 4:13,18 8:16 18:12,15 27:7 28:12 28:18 34:20 40:4,20 41:11,19 64:8,12 72:12,14 80:13 81:2 84:10 91:19 96:19 98:1 120:17 130:16 136:1 138:8 139:12 140:19 145:14 147:2 147:6,10 firefighter 26:13 28:11 firefighters 26:2,21 27:4,8,12 28:4 32:19 firefighting 27:11 60:2 fires 135:2 first 5:3 8:12 11:4 13:15 16:15 19:11,13 23:3 24:18 26:8 31:9 39:7 39:8 44:9 46:7 49:19 50:16,20 57:8 88:15 88:16 90:21 91:4,10 94:17 104:11 118:17 120:16 122:8 124:3 126:3,13 134:4 142:5 143:21 148:10,13 149:2 150:17 firsthand 102:13 fitter 120:20 fitters 122:9 fitting 26:12 five 8:10 66:8 73:17 87:7 90:7,8 111:18 120:20 126:16 138:7 fix 115:1 fixed 3:21 37:15 39:19 fixing 52:11 flames 28:13 flammable 32:21 flares 110:18 flaring 110:12 flash 147:2 flaw 60:16 fled 28:17 flee 28:19 floor 147:21 148:1 150:18 flow 27:3 48:4 71:2 121:18 122:15 123:2 123:3 flowing 29:6 fluctuates 123:6 fluid 38:12 40:5 41:17 41:21 fluoride 147:5,8 focus 16:14 53:8 124:14 focused 14:14 68:9 folks 60:22 62:14 94:12 131:9 follow 40:18 41:9,17 53:6 54:12 61:17 79:10,11 138:3,16 followed 11:7,22 12:18 21:20 40:7 following 11:11,14,16 12:4 21:21 22:6 23:18 25:22 39:2 41:22 64:12 66:3 80:2 87:17 143:12 146:9,22 follows 8:4 139:9 Foods 108:18 force 65:2 75:7 forefront 141:2 foreign 127:16 foremost 9:18 57:9 126:3,13 142:5 148:13 forgive 137:3 forgot 106:21 151:11 form 53:14 formal 35:12,19 66:19 formalize 100:9 formed 22:16 27:20 28:10 64:14 73:1,7 former 72:5 97:21 132:7 147:10 forth 58:11 121:17 126:8 Fortunately 28:18 forward 9:7 13:19 15:7 15:20 18:6,10 58:5 81:5 93:13 94:2 99:8 101:5 124:7 127:10 131:22 148:21 foster 81:4 found 6:18 8:18 17:2 22:21 26:17 29:20 31:4,10 32:4,13 33:1 33:11 34:7 35:3 36:8 37:6 38:4 51:5 79:2 four 20:20 66:6 68:22 83:15 143:21 146:7 146:22 framing 32:7 55:15 56:12 61:10 frankly 149:10 free 96:15 Freiwirth 134:14,15,15 frequency 75:19 friction 121:3,13 front 10:8 12:8 58:19 102:18 128:8 149:19 fruitless 146:6 fuel 25:11 33:2 fuels 29:11 full 31:3 39:5 58:21 101:15 111:18 129:20

(202) 234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. 159 full-time 82:9 fully 49:1,2 77:19 92:6 144:6 149:4 150:6 function 143:18 functioning 144:3 fund 67:12 fundamental 50:15 55:10 funding 67:6,15 funds 67:11 further 15:14 42:13 57:9 76:5 111:10 119:9 126:12 148:11 148:12 future 4:9 96:7 130:20 G G 3:1 G-R-E-G 109:9 gained 59:21 gaining 18:10 gas 20:19 25:10 29:5 gases 110:18 gasoline 110:17 112:9 gate 136:9 gates 138:1 gather 55:21 56:2,8 73:7 gathered 26:5 28:4 gathering 35:20 Gayle 72:6 98:18 103:2 general 1:15 3:12 67:12 140:2 141:22 150:21 generally 69:12 generated 4:19 genocide 126:21 gentleman 133:13 gentlemen 19:10 George 16:20 Gioia 72:22 90:21 91:1 91:2,10 124:11 give 6:16 12:22 60:19 83:11 84:18 99:5 107:18 117:1 124:12 137:13 given 4:5 11:12 101:15 gives 89:5 glad 13:18 16:19 86:8 95:1 102:3 138:18 Glover 72:22 go 12:20 13:9 50:6 51:7 67:2 83:14 91:9 97:4 97:5 107:18 109:16 111:10 113:22 114:12 117:18 123:15 129:21 138:2 goal 43:4 75:11,16,18 117:7 goals 23:22 80:11 124:18 125:4 God 141:4 goes 51:11,12 86:20 131:19 135:6 going 11:4,7,8 12:14,15 12:18 13:15 15:3 20:4 34:5 63:11 76:6 81:14 84:11,15,22 85:21 86:5,5 89:2 96:6 97:9 97:9 103:14 105:20 105:20 107:7,8 108:19 109:13 112:20 114:1 119:16 121:4 123:11,17 124:7 127:6,7 133:1 134:9 136:21 138:7,9,15 145:1 148:21 good 3:3,5 7:19 19:10 45:16 55:19 69:12 86:10 89:21 91:1 95:3 102:8,18,18 104:19 106:15,15 115:6 116:16 120:12 122:11 122:22 124:7 125:16 129:15 131:10 gotten 95:2 100:8 governance 141:21 148:17 149:7 government 5:18 119:22 129:8 132:13 141:20 143:12 governments 136:15 governor 6:14 64:14 governor's 64:18 65:15 gradually 29:18 grandchildren 106:12 granted 113:20 grateful 130:17 gratitude 102:10 gray 30:10 103:16 great 5:18 15:11 71:16 98:21 116:21 149:8 greater 126:16 greatest 6:11 75:21 greatly 91:15 Green 128:1,5 Greg 109:6,9 Griffon 1:12 2:4 3:10 13:15,17 19:8 49:16 49:17 53:6 54:12 55:11 56:11 60:5 61:17 62:10 63:6 86:3 86:4 140:5,6 148:4,12 150:10 151:3,4 Grim 20:14 gross 127:5 ground 25:3 125:10 group 26:6 32:6 56:14 62:6 64:15,19 70:11 70:15,17 73:5 96:9,16 96:17 142:10 groups 54:10,15 60:9 100:7,7 117:14 growing 27:5 guess 56:17 89:19 90:12 124:2 151:10 guessed 116:1 guests 97:17 guidance 35:13 36:15 37:22 38:5,13,19 40:19 71:5 guidelines 36:10 39:12 55:19 61:6 Gulf 132:8 guys 116:12,21 117:6 121:1,10 H H-U-G-H-E-S 108:4 haired 103:16 half 57:20 73:4 141:12 hall 119:8 hands 28:7 happen 19:21 86:16 113:22 114:1 122:12 122:13 135:3 137:2 149:21 happened 17:6 49:9 99:13 105:22 106:4 111:17 114:19 119:2 124:7 135:16,20 happening 44:13 107:21 113:21 114:5 119:18 happens 111:16 126:18 138:6,8 happy 86:7 hard 115:10 116:12 142:9 harder 113:8 harm 101:12,16,22 harms 32:22 34:17 38:22 Harris 72:13 119:5 hazard 15:10 16:4 23:6 66:4,6 73:19 77:11 78:2 79:9 83:17 138:2 hazardous 26:1 32:17 33:11,22 38:12 50:12 63:20 70:9 76:11 93:10 hazards 5:7 18:14 24:3 head 25:18 health 1:20 2:16 6:11 66:15,18 74:18 128:13 133:6 hear 6:1 11:14 12:4 15:3 86:7,11 91:13 97:7 100:19 102:13 118:18 130:18 139:17 139:20 147:20 heard 62:18 117:17 125:19 150:16 hearing 15:7,21 16:7 18:6 102:11 111:12 113:16 131:15 140:1 148:9 hearings 123:20 heart 125:11 heat 96:19 heated 121:6 heating 107:13 heavy 88:18 heck 119:15 heed 117:9 held 4:22 16:2 61:5 hell 97:9 Hello 7:19 help 19:19 28:13 31:12 76:8 96:14 116:9 121:11 130:3 helped 8:10 61:7 99:6 helpful 13:21 24:18 98:2 helping 94:4 hey 114:22 130:9 hierarchy 24:6 66:4 high 15:10 16:4 27:13 30:17 33:2 37:3 55:4 107:11 114:18 122:8 higher 9:6,9,10 30:4 36:19 42:15 55:12 61:3 62:21,22 112:9 112:20 113:5 highest 55:4 highlights 39:4 highly 17:8 hindsight 103:4 hire 67:16 81:9 82:4,13 hired 67:15,21 historically 9:10 51:9 history 106:2 113:9 hitting 39:4 hoc 84:8,13 93:7 hold 91:12,14 102:11 110:5 holding 15:21 91:6 111:6 Holmstrom 1:16 2:7 20:8,22 21:6,11,12 28:21 45:2 48:10 49:21 53:10 55:2 57:7 60:18 62:8,12 63:7

(202) 234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. 160 84:20 85:2,4,15,18 111:17 Holmstrom's 11:11 Holstrom 44:5 home 138:5 honestly 127:3 Honorable 64:4 honorary 118:22 hook 26:14,22 hope 10:1 13:8 15:14 18:22 89:20 103:10 117:4,9 119:18 129:16 131:22 hoped 26:11 hopeful 13:20 116:8 hopefully 98:6,11 109:1 117:18 horn 124:12 Horowitz 1:16 20:5,6 90:14,16,17 94:8 97:14 98:16,18 102:6 104:6 108:1 109:6 115:4,8 116:14 118:11 120:7 123:8 123:13 125:13 127:18 127:20 128:3 130:6 132:4 134:13 137:15 138:21 139:4 Horsehead 145:15,21 147:10,14 hospital 4:21 100:15 131:1,5 hospitals 130:16 host 75:7 hot 27:5,15 35:6,17 59:19 88:17 110:10 hours 68:1,12,21 69:1,2 69:18,19 70:4 Houston 20:21 huge 28:10 Hughes 108:2,2,4 human 66:8 133:17,19 hundred 107:14 hundreds 28:3 hydrocarbon 22:17 27:2,15 28:6 147:6 hydrocarbons 27:21 28:11 32:21 hydrogen 47:21 114:11 147:3,5,7 hydroprocessing 114:11 hydroprocessor 112:8 I I-G-H-T-M-A-N 125:18 idea 136:21 identical 43:1 76:20 identified 23:17 34:18 51:14 55:10 56:6 57:8 57:10 71:1 73:19 135:17 identify 34:9,11 35:6 41:3 42:3 49:22 50:4 70:15 89:22 ignited 27:6 28:11 ignore 112:2 ignored 54:18 III 53:14 illegal 100:12 immediate 22:21 immediately 25:21 27:8 28:2 63:9 impact 45:19 58:21 78:7 88:8 124:1 impacted 46:21 impacting 99:10 impacts 119:20 implement 8:11 9:14 30:18 31:11 41:2 54:6 79:7 93:13 100:3 implementation 16:9 24:5 42:4 43:17 46:3 69:15 78:2 142:16 implemented 32:2 42:19 47:6 53:1 54:9 61:8 67:4 76:5 101:9 101:11 implementing 36:2 46:13 48:7 78:15 101:5 importance 45:12 46:1 46:11 50:22 51:14 55:11 important 7:12 18:4 40:1 46:4 51:2 53:5 57:10,15 58:5,10,17 59:22 63:4 71:15,20 86:19 92:2 93:16,21 98:9 102:16 107:5 115:18 116:2 120:3 128:12 136:5 140:20 148:20 150:1 importantly 66:11 improve 9:8,15 53:18 64:15 65:7 85:10 94:4 146:10 improved 10:3 19:4 36:1 46:14 improvement 50:1 124:14,16 improvements 14:22 15:15 24:8 86:10 93:21,22 improving 13:22 19:2 43:5 132:1 inadequance 4:4 inaudible 54:3 104:13 inch 25:5 29:14 32:2 122:1 inches 59:10 incident 11:17 14:16 16:15,18 18:4,5 19:18 20:11,19 21:15 22:6 22:22 23:3 29:4 31:15 32:13,14,15,22 33:20 34:8,12,19,19 35:5,11 35:14 36:1 43:21 44:9 45:7 47:16 48:22 51:13 52:7,10,22 53:3 53:13 57:18 59:16 61:8 63:13 72:13 74:1 83:19 133:7 incidents 8:7 9:10 23:15,22 33:8 38:7 50:10 59:22 80:5 145:20 include 6:20 16:3 37:12 47:11 62:16 65:2 66:3 70:21 73:14 74:10 75:17 77:3 87:6 included 47:8 72:21 92:13 127:1 includes 42:18 46:13 56:13 57:22 including 4:2 14:5 16:6 45:10,16 54:7 58:7 70:13 116:3 130:12 134:2 135:21,22 139:13 142:21 144:8 incompetence 127:6 incomplete 56:9 inconsistent 37:7 38:1 38:14 incorporate 40:9,13 41:8 60:3 92:6 incorporated 74:10 increase 33:17 39:20 40:14 46:15 81:14,20 81:21 increased 33:12 34:3 46:20 47:2,3 48:4,4 increases 113:6 123:4 increasing 78:21 independent 3:20 67:11 92:20 indicators 82:17 83:6,7 83:14,15,16 indigenous 125:19 126:1 individual 95:15 144:22 individuals 33:19 48:19 industrial 6:4,5 7:2,4 8:11 9:19 43:10 67:5 73:6,6,11 74:15 76:17 76:21 77:2,4 80:9 81:15 82:20 83:4,9 84:9 92:5,8 93:7,11 94:1 108:5 129:17,22 140:20 industries 9:5 industry 4:4 19:20 21:16 31:2 36:7,14 37:6,15 38:4 39:9,20 42:5 45:16 55:19 58:8 60:1 65:11,21 80:12 95:14 96:1 115:20 116:22 inferno 28:17 influence 129:10 informally 26:5 information 12:22 13:6 14:8 18:20 35:21 37:7 37:21,22 38:6,10 40:1 40:16 58:18 59:5 70:19,21 71:1,2 79:15 79:20 88:5 114:14 126:9 147:17,18 informative 60:7 98:2 108:22 informed 34:21 informing 126:9 infrastructure 8:21 114:21 inherent 46:13 113:19 inherently 23:5 24:5 30:6,16,18,20 44:11 44:22 46:11 47:6,10 48:8 73:15 74:12 77:3 111:15 inhibit 51:15 initial 29:8 initially 56:21 initiate 66:18 initiative 56:7 injuries 22:18 innovation 24:3 input 73:7 75:8 91:13 Inservice 37:13 inside 28:12 121:15 137:22 insights 59:20 inspecting 89:15 inspection 17:15 31:18 31:20 36:12 37:1,13 37:13,16 40:13 41:7 42:9,20 54:8 67:20 68:2,12 69:3,3 70:16 79:12 88:2,2,3,20 135:10 inspections 32:9 54:16 68:7,9,16,16,19,20,22

(202) 234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. 161 69:2,8,17,19 70:14,21 78:21 79:22 80:21 83:20 inspectors 25:11 70:8 installment 5:3 instance 129:12 instigate 10:2 Institute 7:7 36:9 39:7 instructed 32:19 instrumental 14:11 insulated 25:5 insulation 26:9,14,22 27:4,10,13 32:20 35:5 35:7 insurance 9:11 integrated 62:6 integrity 7:5 42:10 52:11 62:13 121:5,14 intended 47:17 74:16 intensive 67:22 interacting 54:11 interagency 64:14,19 65:1 70:11 interest 10:18 15:11 56:13 interested 119:14 interesting 89:19 interim 5:4 29:2 46:7 72:19 111:12 interjected 63:3 intermediate 29:10 internal 31:11 32:8 36:1 143:1 internet 99:9 interrogation 85:1 interrupted 151:12 interviews 33:21 53:3 introduce 20:3 introducing 3:15 11:20 introduction 28:21 inventory 27:21 invested 114:11 investigate 20:18 investigates 3:21 investigating 91:18 93:17 investigation 4:16 5:1,3 10:17 11:14 14:2 19:14,16 20:10,12 21:8,9,9,14 23:2 28:22 30:22 31:5 39:1 43:20 45:4,5,6,15 74:2 139:6 140:18 141:15 144:20 145:4 145:11 146:18,20 147:1,9 investigations 4:1 47:16 52:22 83:20 144:22 147:1,4 investigative 4:12 8:14 10:14 84:19 139:10 investigators 20:14 21:7 44:10 invite 7:15 63:14,19 invited 65:20 involve 149:10,15 involved 19:13 35:5 49:13 50:10 54:2,10 57:1 60:20,22 62:2 124:4 involves 50:15 Ironically 55:15 ISO 43:10 74:20 75:18 99:21,22 100:11 isolate 25:17 issue 4:7 14:12 45:3 51:10 55:6 57:8 106:6 133:14 145:10 issued 64:20 72:19 145:18 issues 5:5 8:18 21:16 45:9,10,11 52:10,21 54:4,9 55:10 82:10 124:15 142:12,20 143:7,9,15 145:1 148:21 item 20:5 96:20 items 42:9 43:17 50:7 58:6 61:10 80:2 96:10 96:10 J J-E 134:15 J-O-E-L 132:6 Jael 72:3 James 53:14 January 1:7 16:10 139:16 147:1 Javonka 72:21 Jeff 123:9,16 Jerry 134:14,15 jet 33:2 Jim 72:20 115:4 116:18 job 19:16 96:12,12 97:2 97:3 122:8 128:11 132:15,18,20 133:11 136:8 jobs 88:21 132:15 Joel 132:5,5 John 72:22 90:21 91:1 Johnson 20:14 join 111:8 114:22 Joining 3:9,11 joins 141:13 150:12 joint 70:14 72:19 75:4 75:10 77:17 79:14 jointly 9:8 Jones 97:15 Jovanka 72:4 100:1 JR 1:11 69:20 July 73:9 81:19,20,21 147:4,9 justice 127:4 justification 88:11,15 88:22 89:1 K K-A 109:9 K-I-L-B 123:16 Kaiser 130:13 131:6 Karras 109:7,8,9 111:3 Kate 120:9 Kathleen 118:13 keep 50:14 111:8 114:9 119:12,15 138:15 keeps 119:14 kept 105:20 110:9 key 17:2 21:13,19 24:14 28:22 30:22 31:10 34:6 36:8 40:9 Khan 120:8 Kilbreth 123:9,11,16,16 125:14 killed 100:13 132:14 kind 8:12 52:3 53:20 78:13 79:20 87:12 100:6 103:3 107:5 kinds 124:19 knees 28:8 knew 25:11 know 3:19 4:17 13:2 52:16,17,18 53:7 57:22 58:1 59:20,21 59:21 60:16 62:4 72:17 74:15 89:22 92:2,9 93:16 94:18 95:19 99:10 100:18 100:20 101:3,13 103:2 106:3,21 110:16 112:4,12,15 113:5 117:2,7 118:5 118:22 119:1,2 121:7 121:10 124:15,19 125:2 126:17 131:16 131:19 132:16 137:4 138:6,18 141:13 knowledge 31:16 34:12 101:18 111:18 known 26:12 29:16 31:19 65:4 142:3 KPI's 124:19 125:4 L L-A-I-D-M-A-N 128:4 L-A-V 94:16 La 20:20 labor 65:21 92:14 lack 17:9 34:12 55:17 60:7 ladies 19:10 lagging 82:16 Laidman 127:21,22 128:1,3,4 land 126:2 language 38:2,3 40:14 73:2,14 74:10,13 75:17,22 76:1,19 121:3 127:17 large 4:19 27:21 99:15 larger 59:19 Larsen 118:12,12 Lastly 70:17 71:4 late 27:19 lately 120:15 latest 8:19 Lauren 20:14 Lavely 94:13,16,16 law 67:1 105:14 111:6 laws 6:14 121:3,13 lead 20:13 57:20 59:2 134:11 leader 21:1 leaders 104:14 117:14 leadership 71:16 93:20 124:9 leading 69:21 82:16 leak 17:21 18:11,15 25:18,20 26:9,11 27:9 27:14 32:17 33:4,5,7 33:11 34:10,13,15,21 35:3,6,8,12,16,21 36:2,6 38:7,16,17,20 40:5,7,9,19 41:9,18 41:21 45:8 49:10 50:12 57:19 58:9,22 60:4 99:20 103:6 110:10 leaking 25:7 26:21 32:21 33:1 34:22 leaks 7:3,4 26:2 36:4 38:5,12,15 57:13 lean 117:11 learn 120:21,22 learned 19:18 53:1 95:11 110:4,4 learning 71:20 72:14 leave 10:6 62:7 104:16 led 9:10 21:7 24:17 34:14 47:4 53:15 59:7 left 3:10 legal 119:10 legislators 6:15

(202) 234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. 162 lessons 19:18 53:1 59:22 95:11 let's 97:6 118:12 level 10:4 14:13 15:20 16:1 55:13 60:14 61:3 62:21,22 63:3 77:12 89:21 95:4,4 101:8 107:10,11 111:7 119:13 levels 60:22 140:22 life 106:11 121:20 128:17 133:18 136:6 136:6 light 25:10 29:5 137:21 liked 20:15 limit 12:12 59:18 limited 56:8 65:2 66:3 68:3 95:21 limiting 38:20 Lina 72:10 Lindsay 1:19 2:14 63:22 71:9,11 76:10 76:16 line 24:20 25:8 100:5 106:8 110:3 128:8 lines 132:20 142:2 Lipo 138:21 liquid 25:4,10 27:15 liquify 121:10 listened 134:5 137:5 listening 123:7 little 50:6 80:19 85:1 103:16 104:7 119:2 127:2 133:1 134:7 135:6 137:22 live 91:2 105:6 130:12 148:17 lived 8:4 lives 35:9 100:18,20 101:4 128:9,22 133:19,20,20 137:22 living 122:22 lobbying 129:10 local 5:8,11 9:18 11:16 70:2,4,20 80:13 81:2 92:7 100:15 107:19 115:12 116:17 117:3 118:9 134:18 located 17:11 location 4:6 27:9 35:7 locations 19:21 locked 113:12 Loeb 1:15 3:13 140:4,7 140:9 150:21 151:1,3 151:5 long 8:6 85:20 120:14 120:14 122:1 longer 122:3 131:3 146:5 look 6:21 13:19 15:7 18:6,10 44:11 48:7 53:9 63:17 77:10 79:14 81:7 82:10,15 84:9 93:12 94:2 96:4 96:8 98:11 101:4 114:6 121:20 127:9 142:1 149:5 looked 7:4 53:11,16,21 77:2,7 78:15,19 82:21 89:20 looking 52:8 76:17 77:22 79:4,5 83:16,16 103:2 122:1,17 142:11 looks 77:9 118:12 LOPA 77:13 lost 130:1 lot 12:9 57:12 60:13,21 89:10 91:12 96:3 97:10 103:7 110:17 111:22 112:1,11 118:6,18 120:14,18 122:12 129:21 131:10 low 30:13 36:17 37:1 39:15 40:2,17 41:5 56:5 63:3 75:14 119:7 lower 9:11 42:20 60:13 60:22 79:4 112:9 lubricants 29:12 M M-A-R-T-I-N-E-Z 97:20 machine 107:8 maintain 98:10 maintained 34:4 132:22 maintenance 18:1 56:17 88:6,6,14 89:7 135:15 major 3:21 10:19 73:21 73:22 74:2,3,6,7 84:1 117:22 majority 143:1 maker 107:19 makers 111:6 making 32:13 33:9 50:13 51:3 54:16 55:1 57:11,21 58:10,15 59:6 60:10,21 61:2,5 63:5 66:19 79:7 91:19 93:17 114:3 120:2 129:22 manage 40:10 113:9 management 4:5 6:7 14:10,10 15:1,19,22 17:8 24:11 35:14 42:15 45:11,12,18 46:5 47:5,19 48:6 50:16,20 51:1,18,20 60:14 62:16 63:17 64:12 65:4 73:20 95:4 96:13 97:4 100:12 106:19 107:1,2 111:7 117:11 124:21 125:8 142:11 144:9,11 management's 116:6,7 manager 63:16,22 64:11 71:9 managers 10:16 26:4 52:14 55:13 60:20 62:22 110:6 133:6 Managing 1:16 20:3 90:14 mandate 10:3 Manny 1:11 2:4 3:11 48:11 March 147:8 Marie 130:7,9 Mark 1:12 2:4 3:10 7:16 7:21 13:15,16 20:14 49:21 marshal 72:14 Martinez 72:5 97:18,19 97:19 Mary 94:12 material 17:10 30:10,11 30:20 31:21 37:17 40:22 59:12 150:6 materials 30:3 46:14 63:20 70:9 76:12 93:10 111:14,22 matter 19:19 90:9 100:20,21 101:1,3,4 148:5,7,8 149:4 150:11 151:17 matters 123:19 142:22 149:7 mayday 28:14,14 mayor 7:9 43:3,8 71:21 72:2,6 98:19 McLaughlin 72:6 98:18 98:20 101:1 mean 53:11 54:14 62:12 86:13 121:14 131:5 meaning 101:12 means 70:22 118:5 mechanical 7:5,8 38:8 41:14 42:10 52:11 62:13 67:17 mechanics 33:18 mechanism 23:1,6 29:16 42:13 49:3 66:5 78:2,9 79:8 mechanisms 34:9 37:14 39:19 58:1 59:1 media 102:14,15 119:13,19 medical 22:19 130:13 131:1 meet 5:17 meeting 1:5 3:6,17,18 4:11 12:20 14:14 16:2 16:11,13,15,22 64:7 71:14 79:6 91:6,13 94:10 119:8 141:18 148:18 149:11 151:15 meetings 4:22 12:19 19:13 61:10 65:10,14 65:19,22 75:8 79:13 member 1:11,12 2:4,4 3:10,10 9:20 48:11 55:11 72:3,4,4,6 97:20 118:4 132:10 134:18 148:14,18 150:4,11 members 1:9 3:15 9:3 11:6 12:1 13:14 22:7 22:19 64:5 65:22 72:2 72:20 76:15 91:8 97:15 98:22 102:9 104:2,15 106:10 107:15 109:9 115:7 115:21 126:4 139:22 142:21 150:20 mention 104:21 mentioned 47:12 48:18 48:21 52:8 56:19 76:16,22 mentioning 44:15 Mescariolo 137:16 met 84:13 93:8 metal 26:12 44:14 metallurgies 30:5,6 metallurgists 62:5 metallurgy 30:19 54:8 metals 99:18 meters 121:18 122:15 123:2 method 42:3 77:16 96:22 methods 36:15 66:9 microphone 139:19 mid 114:9 middle 60:14 mike 87:9 milestone 140:20 Miller 16:21 17:7 mind 94:14 114:9 142:13 minding 114:22 minimum 38:3 39:14 41:17 42:19

(202) 234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. 163 minutes 12:13 24:15 28:10 83:1 87:7 90:7 90:8 108:3 139:2 mirror 8:19 mission 143:20 146:10 mitigate 36:4 38:11 mitigation 35:4,22 mixed 27:6 model 85:8 98:9 141:7 models 15:14 16:4,7 modern 5:10 144:11 modernization 78:8 98:4 124:5 modernize 5:14 141:1 modified 56:22 modifying 148:16 moment 57:12 96:19 Monaca 145:15 147:11 money 105:9,9 112:11 136:19 monitor 36:15 78:1 113:8 monitoring 18:18 month 110:11 months 145:6 Mother 126:21 motion 139:8,17,22 141:20 143:21 144:13 144:19 145:7 146:7 147:21,21,22 148:1,1 148:5,7,8,10 150:9,10 150:14,15,17,18 151:12,13 motor 29:11 Moura-Eraso 76:15 Moure-Eraso 1:10 2:3 3:3,7 10:11 19:7 20:1 44:3,4 45:2 48:9 49:15 63:8 64:5 71:7 76:9 84:17 85:14 86:2 86:12 87:9 89:18 90:11 91:7 94:6 97:13 102:4 103:20 118:3 139:3,20 140:10,12 140:16 147:20 148:6 150:8,13 151:6,9 move 9:7 81:5 139:4,9 146:9 moving 20:2 26:16 90:6 131:21 mute 13:11 Myrick 72:3 mystery 110:19 N N 3:1 N-O-M-P 104:11 Nadel 130:7 name 7:20 63:18 64:10 94:15 104:9,11,11 108:3 116:16 118:14 120:12 123:14 125:16 125:17,18 narrowly 9:1 22:17 Nat 72:3 nation 9:19 nation's 141:3 national 10:3 14:3,12 15:13 89:21 119:13 120:17 nationally 8:12 nationwide 14:1 19:4 114:18 Native 125:21 naturally 29:19 nature 85:6 87:2 near 20:21 25:3 96:7 130:12 nearby 28:4 130:15 131:5 nearest 131:2 nearly 43:1 100:13,14 124:8 necessary 18:1 35:21 need 13:6,8 14:4 15:15 15:21 23:4 44:11 54:17 95:16 96:5,14 109:16 113:13,15 125:4,4 126:12 127:8 127:9,10 133:3,5 134:9 136:13,13 137:12 needed 14:8 18:4 133:12 143:9 needs 55:4 96:15,17 102:22 103:1,7 136:12 negligence 126:21 127:5 negotiate 110:22 negotiating 124:5 negotiations 133:22 neither 23:20 Network 104:14 never 105:21 142:14 new 6:9,12 9:7 36:5 37:18 41:1 47:14 66:21 67:3,15,16 72:12 74:8 86:21 93:2 93:5,13 129:19 134:1 143:22 144:19 145:3 146:11,18 newly 24:3 67:14,21 newspapers 119:13 NFPA 120:17 Nice 98:18,20 nine 67:16 Nineteen 9:1 Nompraseurt 104:8,10 104:10 non 3:20 136:7 nonessential 59:18 normalization 50:8 normalize 141:20 normalized 32:16 normally 25:1 normative 41:8 norms 143:13 north 87:22 88:4 Northern 132:11 note 53:22 69:16 noted 46:17,17 47:1,2 50:9 notice 13:10 18:17 97:15 noticed 25:3 notification 103:8 notified 54:5 60:15 November 5:13 14:20 20:18 147:2 NTSB 144:8 nuclear 95:9,20 number 3:14 25:8,12 26:4 31:7,15 48:19 53:17,21,22 55:16 67:8 75:19 94:11 126:11 128:18 139:10 142:12 143:22 144:14 145:6 146:19 numerous 5:20 144:1 nurses 130:11,11,14 131:19 nut 87:12 O O 3:1 Obama's 9:14 obscured 27:10 obvious 138:2 obviously 19:12 49:10 62:3 108:10 occasions 31:17 Occupational 66:15,17 occupying 126:2 occur 36:6 46:7 79:5 136:22 occurred 4:10 16:16 18:6 32:22 45:7 80:5 97:10 139:12 occurring 29:19 57:13 occurs 61:16 96:2,5 October 23:13 OES 79:18 office 1:16 2:8 7:17 11:8 20:8 66:22 79:18 officer 49:4 68:2,6 officers 67:16,21 68:15 70:7 offices 149:17 official 12:16 114:14 officials 42:15 63:1 oftentimes 110:15 oil 25:10 29:5,8,19,20 36:11 39:13 67:3,8 110:6 113:11 114:12 114:21 121:7 132:10 132:16 137:4 okay 87:11 89:1,2 90:11 91:9 97:6 120:7,8,9 127:20 130:7 137:16 138:21 140:12 151:9 151:11 old 145:8 once 8:7 71:13 116:11 145:4 ones 3:16 130:14 ongoing 83:11 open 27:19 43:22 65:22 88:20 89:2 opening 2:3 11:5,5,6 13:14 82:4 openings 82:5 operate 26:20 50:11 103:5 operated 25:8 132:22 133:19 operating 17:12 25:1 34:22 68:10 operation 32:16 33:5 33:10 49:5 operational 16:22 operations 35:13 51:3 90:1 99:19,20 131:12 141:22 146:11 operator 25:2,18 26:7 132:7 134:4,17 operators 28:5 33:18 134:22 135:15 opinion 143:7,18 opportunities 9:7 46:12 50:1,3 opportunity 10:15 11:12 14:16 21:22 22:7 64:6 84:19 89:5 145:10 148:20 150:5 opposed 58:15 order 14:6 106:20 133:4 143:22 144:14 146:11 146:15,16,19 149:14 orders 143:2,5 144:2 146:13 ordinance 8:11 9:19

(202) 234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. 164 43:10 73:7,9,10,12 74:14,16,19,20 75:1 76:17,21 77:3,5 80:9 80:18 81:16 82:8 83:3 83:5,9 84:10 92:8 93:7,11 94:1 105:18 105:18 129:17,22 Ordinances 92:6 organization 6:21 61:1 61:3,21 63:3,5 103:22 118:7 129:8 142:15 organizational 16:17 17:14 18:8 21:16 31:1 31:9 54:1,13 60:11 61:18,19 organizationally 55:9 organizations 22:5 65:13 organize 134:11 organized 126:5 organizer 132:12 organizing 108:17 originally 122:19 OSHA 14:6,9 OSHA's 15:15 ought 97:17 Outreach 7:16,22 outside 121:15 137:22 outstanding 19:16 72:15 142:7 overall 61:14 75:11 overhead 25:6 overridden 17:16 overriding 55:3 oversee 43:16 70:6 92:15 oversight 43:12 51:2 55:12 61:4,14 62:16 64:16 69:22 80:15 81:2,15 92:13 100:4 100:10 overwhelming 59:14 P P 3:1 P-A-Y-N-E 115:8,9 p.m 3:2 28:9 Pacific 104:14 package 82:22 PAGE 2:2 pain 101:21 panel 2:12 6:2 11:21 12:2 15:8 22:2 63:10 84:21 85:3,16 panelists 11:15 15:4 paper 119:16 127:2 paperwork 5:17 paragraph 137:6,6 paramount 8:22 Parker 125:19 part 12:13 29:7 46:4,19 60:21 73:5,20 82:21 84:3 98:12 101:5 111:3 119:4 129:17 131:21 146:11,14,17 146:22 PARTICIPANT 151:7 participants 33:21 participate 16:13 64:6 75:9 participated 65:9 participating 16:7 participation 66:11 75:4 particular 15:16 25:15 63:12 72:10 73:13 particularly 130:21 131:11,19 135:9 parties 9:6 47:10 100:10 partly 111:20 parts 110:1 146:7 party 92:20 128:1,5 132:12 passed 6:15 86:21 95:14 Path 15:20 Paul 94:13 Payne 115:5,5,6,9 116:18 pays 117:9 PCC2-2011 41:15 Pennsylvania 145:15 147:11 people 7:12 12:9,11 18:14 28:3 35:20 51:4 57:10,11 59:18 62:1,4 62:15 82:4 90:4 94:21 101:2 103:15 110:6 111:4 113:16 117:19 118:1 124:1 126:4,14 127:3 129:19,20 130:15 131:16 133:20 135:15 136:18 138:8 perceived 55:17 percent 31:20 32:9 37:1 54:7 81:17,20,21,22 114:1,6 135:10 percentage 67:9 perform 32:8 36:22 73:15 74:11 78:4 79:21 performance 82:17 performed 47:11 69:5 performing 25:2 46:11 period 30:15 31:14 143:2 permanent 143:4 permission 112:2 permissive 38:3,13 permit 113:20 permitted 3:16 person 84:20 125:20 personal 42:6 personally 71:4 104:22 118:6 personnel 31:15 34:16 34:20 35:13,18 38:21 49:12 54:11 67:14 69:5 143:10 144:12 perspective 109:19 142:2 pertain 15:12 pertaining 65:11 Peter 120:10 Peterson 120:11 petroleum 7:7 23:15 24:11 36:9 39:7 43:5 43:11 64:21 65:11 68:3 70:1 Ph.D 1:10 philosophy 144:8 phones 13:11 phonetic 118:13 120:8 120:9,10 130:7 137:1 137:16 138:22 phraseology 100:19 physical 4:2 17:10 pick 88:16 105:8 picked 88:1 picture 121:21 133:4 pike 26:13,18 pin 26:8 pipe 22:13 25:5,7,16 26:9,16,19,21 27:1,13 27:16,19 28:1 29:17 30:9 31:12 33:1,4 35:9 54:17 112:5,12 121:2,5,14,15,21,22 122:1,9 139:11 pipes 96:3 113:1 114:7 121:13 piping 5:6 17:16,18 22:13 29:3,13,15,21 29:22 30:10 31:19,22 32:10,20 34:10 35:1,6 36:17,19 37:8,12,16 37:18 39:16 40:2,11 40:13,18 41:1,3,7,16 44:14 45:8 46:21,21 56:5 78:16,18,21 79:5 83:21 99:18 121:4 place 3:17 18:19 32:14 34:1 46:6 52:1 78:14 78:20 100:11 104:4 108:13 109:19 113:12 115:22 149:15 places 132:18 placing 32:21 plan 79:1 80:7 131:21 planned 68:6,8,19 110:12 planner 72:11 planning 14:10 32:6 58:14 95:9,10 97:21 98:3 129:18 144:22 plans 78:20 plant 50:11 52:17 54:5 54:11 55:13 60:14,20 95:15 146:5 plants 114:12 149:22 plaque 119:1 play 24:18 52:6 played 55:9 please 7:18 13:10,11,16 20:5 21:11 64:3 104:9 108:2,3 111:8 pleased 10:21 pleasure 117:6 plume 4:20 plus 132:9 134:19 point 19:14 26:8 61:2 103:11 113:16 119:5 119:19 134:8 pointed 16:22 45:16 52:4 poised 141:1 poisons 110:13 poke 138:2 poking 26:15 pole 26:13 policies 36:2 policy 105:14 107:19 107:21 political 129:3,4,7 politics 117:21 pollution 124:17 poor 49:20 population 126:2 Porte 20:20 portion 11:22 32:10 94:19 posed 136:21 position 51:20 82:10,13 possible 16:13,17 18:8 possibly 94:20 postponed 96:21 potential 32:12 34:9,11 34:13 35:16 38:17 40:11 56:5 58:21,22 75:8 potentially 78:16

(202) 234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. 165 power 51:17 95:9,20 97:6 108:12 133:13 135:12 136:15,20 PQV 69:3,8 practicable 75:14 practice 26:1 36:9 45:16 55:19 60:3 74:14 112:16 practices 10:3 17:11 37:10,16 38:10 41:7 42:5 69:13 144:7 148:17 precautionary 101:10 prepare 73:8 prepared 146:1 presence 33:11 68:14 present 1:9,14,18 4:12 11:8 12:7 20:16 24:14 37:7 38:6 50:12 presentation 11:11,22 13:19 21:18,21 43:19 50:5 Presentations 2:12 presented 29:2 30:7 65:14 150:17 presenting 10:20 20:9 21:1,13 President 9:14 116:18 President's 14:5 press 10:22 pressure 27:14 41:16 111:21 129:7,10 pressured 116:1 pressures 57:12 presumed 134:8 pretty 59:13 61:21 84:5 88:17 prevent 4:9 5:6 6:10 23:22 31:12 32:12 40:1,17 44:12,22 61:8 130:19 preventable 8:6,18 prevented 108:11 preventing 10:19 39:14 75:19 prevention 81:17 106:8 106:17 141:3 previous 6:20 92:3 previously 62:19 primarily 21:16 123:22 primary 36:14 131:1 principle 72:11 101:11 principles 17:3,7 101:10 prior 31:14 42:19 45:5 46:2 47:11 68:2 88:3 88:12 priority 8:22 55:5 private 48:16 85:19 142:1 144:9 149:17 proactive 85:6,10 86:17 probably 13:2,9 probation 69:18 problem 26:6 96:1,1,6 99:13 105:7 136:2 problems 56:20 89:22 95:12 107:7 120:19 procedure 48:20 144:20 145:5 procedures 68:10 133:6 143:1,9 144:15 proceed 21:11 119:6 139:5 150:21 proceedings 7:14 13:12 process 5:16 6:7,12 14:4,7,9,22 15:19,22 23:7,18,21 24:8,10 29:8 33:2 34:17 35:15 38:5,7,12 40:5,7 41:17,21 42:5,8,11,17 43:5 45:20 46:5,6,19 47:6,14,14,15 50:17 50:18 52:21 53:18 58:7,12,14 59:11 60:4 61:15 62:7,20 63:1,2 63:16 64:11 65:4,11 66:19 71:2,6,15,20 73:5,19 74:8,22 76:4 77:11 78:14,22 79:9 79:10,12,12 82:3,10 82:12,15,16 83:17 84:3 92:19 96:10 116:5 117:10 134:3,5 134:22 141:1 144:21 146:5,20 processed 67:9 processes 29:11 59:1 73:17 74:8 78:11 produce 29:11 produced 1:22 142:6 product 121:4 123:5 136:19 production 25:22 51:1 productive 120:1 productivity 9:11 products 5:1 29:12 45:22 121:7 139:14 142:6 professionalism 91:17 professionals 142:10 profits 110:8 128:15 132:20 137:9,10 profoundly 99:9 program 12:13 17:1 37:18 40:22 41:2 63:21 65:5 67:7,19 68:20 69:10,11,14 70:5,7 75:5,10 76:12 79:14 81:17 95:11 96:1 98:12 144:16 146:15 programmatic 143:16 programs 54:3 117:12 progress 15:5 86:7,11 141:5 progressive 117:14,21 progressives 129:21 project 78:6,8,10 98:4 113:22 115:2 124:5,7 prominent 104:4 promise 60:6 pronunciation 104:7 proposal 116:11 144:16 proposed 21:20 39:2 40:19 41:12,22 42:22 44:2 65:16 66:2,14,21 73:13,21 75:15 109:12 116:3 145:5 proposes 39:11,18 40:3 40:8,12,21 41:6,14 42:2,7,16 protection 9:20 23:11 40:4,20 41:11,19 51:4 77:8,9,12 120:18 protects 130:1 protocol 35:12 36:3,5 40:6,10 41:10 57:16 57:19 58:3,9 145:4 146:19 protocols 60:4 proud 117:20 132:9 prove 85:21 113:17 140:19 proven 133:8 provide 12:8 18:19 22:4 35:12 37:20 38:10 39:22 40:16 42:11 67:6 76:4 87:15 88:5 105:14,14 107:18 109:17 provided 1:22 70:3 104:1 provides 9:7 58:4 68:1 144:13 providing 105:1 provisions 52:1 134:2 proximity 18:15 PSM 15:16 62:1,6,13 65:16,20 66:2,12,14 67:2,7,13,16,18,20 68:10,15,18 69:4,10 69:17 70:4 87:4,4,15 PSM/OE 61:20 public 1:5 2:18 3:5 4:22 12:5,14 15:21 22:8 64:6,15 65:13 66:1,19 71:14 83:7 90:4,15,20 91:13 92:15 103:8 141:18 146:2 147:12 149:12,19 151:15 published 37:9 38:9 puddle 25:3 pull 26:14 pulled 135:19 punch 110:3 puncture 26:18 purely 143:7 144:2 purities 120:22 purpose 4:11 75:17 purposes 80:10 pursuant 141:16 pursued 145:2 push 9:14 pushing 149:18 put 3:18 27:7 34:16 38:22 55:4 74:14 82:7 83:3 84:8,22 88:7 99:8 104:19 107:11 115:22 121:17 122:19 141:2 146:6 149:14 putting 51:2 Q Q-U-A-N-A-H 125:17 quality 68:20 69:11 112:9 113:11 124:20 125:8 131:17 Quanah 125:14,18 quarter 128:19 question 44:6,18 46:22 48:14 60:5 86:13,18 87:2 110:20 115:21 137:8 140:1,4 148:9 150:16 questions 2:10 11:13 12:1 16:8,16,20 18:4 18:7,8 21:3,22 44:1 48:12 49:18 57:20 84:21 85:2,16 86:6 124:21 135:1 quicker 114:17 quickly 27:7 59:8 quite 51:11 127:2 149:10 quoting 17:3 R R 3:1 R-A-S-E-U-R-T 104:12 R-E-B-E-C-C-A 137:19 R-E-T-H 123:17

(202) 234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. 166 R-I-T-T-O-N 132:7 R-R-A-S 109:10 R-R-Y 134:16 R7 47:9 radioed 28:13 Rafael 1:10 2:3 3:7 railroads 133:19 raised 16:10,16 64:20 rally 102:17 Randy 1:20 2:15 63:20 63:21 76:3,11 93:9 range 82:1,2 ranking 30:17 rapidly 27:20 rarely 129:7 rate 30:2 36:19 113:7 rates 9:11 Rating 37:13 rational 116:6 Razor 123:8,9 reaching 124:13 react 29:21 read 5:5 93:2 123:20 148:2 150:19 readily 10:16 reads 8:4 139:8 ready 3:4 75:9 real 117:19 133:10 137:8 realistic 145:10 realize 25:14 127:8 really 48:14 62:2 71:18 72:17 76:3 80:8 85:5 88:22 99:2,5,12,12 102:22 103:3 106:7 106:16 116:11 126:6 128:10 reason 111:4 reasonably 73:22 74:3 74:6 75:14 reasoning 119:11 Rebecca 137:17,19 rebuild 113:10 rebuilds 47:14 rebuilt 112:4,6 receive 67:21 87:19 received 28:15 118:22 recognition 12:10 104:3 recognize 7:11,15 13:13 94:17 141:9 recognized 21:10 69:12 recommend 37:2 105:4 recommendation 24:9 26:7 39:6,17,18 40:3 40:12,21 41:6,13,15 41:20 42:2,7,13,14,16 47:8 58:8 60:2 77:21 78:3 81:7 82:14,18 84:7,16 100:5 115:17 116:9 119:6 146:15 recommendations 2:6 4:8 5:22 6:19 7:6 11:2 12:17 13:21 14:21 19:1 21:20 22:11 23:9 24:15 31:12 32:1,8 39:3,5,8,11 42:1,10 42:22 44:2 46:9 53:12 54:6,16,20,21 55:21 56:10 60:10,15 61:15 65:15 72:16 73:3 75:3 77:1,1,20,22 82:6 83:17,18,19 86:16 91:20 92:3,22 93:3,6 93:12,14,18 98:4,5,8 99:17 101:6 107:20 109:12,17 115:11 131:14 135:8 137:4 139:14 144:16 145:19 149:16,20 recommended 31:17 36:9 37:10 38:10 42:8 53:13 60:3 62:19 73:18 92:6 131:11 146:17,20 recommending 62:3 recommends 74:2,6 record 90:10 109:10 140:2 151:18 reduce 23:22 30:6 75:13 reduced 9:10 reducing 5:16 75:19 reduction 24:12 124:16 124:17,22 refer 39:21 56:18 reference 41:9 44:13 referrals 68:8 70:13 referred 30:5 referring 62:2 133:14 refine 107:8 refined 127:13 refineries 5:9,16 6:8,17 9:12 14:1 19:3 23:1 23:15 24:12 36:11 39:13 40:4,20 41:11 41:19 43:6,11 53:16 53:22 64:17,21 65:8 65:17 66:21 67:4,6 68:3 70:1,16 87:14,20 87:22 88:1,4,4,16 89:12 92:11 95:11,13 109:2 114:7 121:8 122:5 126:15,19 127:14 131:18 132:16 132:17,21 133:18 refinery 1:3 4:14 6:13 8:5,6,16 17:13,17 20:11 22:12 26:2 29:10,22 33:10,13,16 34:3,4 35:13 36:4,7 45:20 50:2 53:8 55:4 59:1 60:3 61:9 64:13 64:19 65:1,3,11,12 67:7 68:6,11,19,21 69:20 70:8 75:7 78:11 78:16 79:13 80:15 82:11 86:22 87:12 92:17,22 93:22 101:20 108:12 111:19 114:2 116:3 117:18 122:19 125:9 130:12 130:16 131:3,9,12 132:8,9 134:17 135:14 136:4 139:7 139:11 145:12,14 147:3,6 refinery's 32:5 89:1 refining 29:8 37:15 39:20 53:19 reform 14:4,7 15:13,19 15:22 regard 61:18 137:22 143:5 regarding 8:15 21:22 54:16 region 7:12 Regional 1:16 2:8 11:8 20:7 regular 30:14 regularity 135:5 regulated 95:20 regulating 15:10 regulation 16:5 69:4 75:8 86:21 87:3 89:19 125:9 regulations 4:4 6:9 15:1 23:19,21 24:2,11 43:10 65:4,6 66:14 89:10,14 131:17 regulator 43:13 regulatories 81:9 regulators 141:5 regulatory 3:20 5:11,15 14:7,17 15:9,13,18,22 22:2 23:12 63:10 65:6 71:3 75:5,10 79:14 81:6 82:22 104:1 135:21 136:14 reinstitute 98:7 reiterate 140:18 reject 88:9 rejected 32:8 54:20,21 55:17 61:9,11 rejecting 56:9 related 4:3 9:3 11:16 31:4 42:9 45:11 46:20 55:11 144:2 relates 86:22 87:3 relating 39:9 Relations 6:4,5 67:5 82:20 relationship 51:17 103:11 release 10:22 22:17 65:5 74:1,4,7 75:13 81:17 147:5,8 released 5:1 23:2,3 93:1,3 releases 18:21 66:7 75:20 145:13 reluctance 33:12,18 rely 113:9 remained 32:3 33:5 remaining 27:10 remains 135:1 remarkable 118:19 remarkably 142:8 remarks 16:21 140:17 remind 126:14 remove 26:22 32:20 35:7,17 removed 29:4 46:18 removing 26:9 repair 33:3 37:14 41:16 repaired 33:7 52:19 repairs 41:21 47:15 52:12 repeatedly 135:21 replace 17:16,18 30:19 32:9 112:12 128:17 replaced 59:12 114:8 replacement 54:17 135:10 replacing 78:21 112:22 report 2:20 4:13 5:2,4,4 5:10,12,13 6:18 7:6 8:19 9:5 10:20 11:9 11:10 12:15,16 13:19 13:21 14:15,17,17,21 15:8,18 16:14,19 19:1 20:10 21:5,14,19 22:1 22:10 23:3,8,12,12,17 29:1,2 30:22 31:5 43:20 44:1,11 46:7,8 46:17,18 48:18 50:4 52:5,21 53:15 54:2,14 58:4 60:6,19 62:20 64:8,18,22 65:15 72:19 74:2,5 81:6,7 84:7,14 93:4,10 94:22 95:1,5 104:1,20

(202) 234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. 167 107:18 108:21 109:12 117:5 124:13 125:6 127:2 130:18 131:11 133:1 134:6 135:9 137:20 139:6,10,16 140:14 145:10 reported 34:3 60:11 reporting 33:21 84:11 reports 5:22 6:20 8:19 23:2 31:7 44:8 45:3 71:1 75:4 83:22 84:1 91:22 92:3 123:20 133:9 134:20 145:19 repository 79:20 represent 91:2 115:14 130:11 representative 101:2 118:20 representatives 11:18 22:2 43:14,14 65:21 70:5,6 92:14 representing 7:21 71:21 reputable 99:4 request 14:8 require 6:9 23:4 24:4 36:5,12,22 38:14,20 40:5,18 41:1,17 43:11 45:17 142:13 required 9:3 68:12 88:5 requirements 5:18 24:13 38:3 39:14 41:10,18 74:20 requires 67:5 73:14 74:11 150:14 requiring 66:9 83:3 87:8 rescind 146:14 rescinds 144:1 research 95:22 researchers 146:6 reset 123:14 resetting 42:19 Resident 137:18 residents 4:20 100:15 residual 112:7 resistant 37:4 99:18 111:14 resolution 144:18 resounding 151:4 resource 68:4 respect 10:13 12:11 respective 85:12 respond 38:11 62:9 responded 34:21 responders 18:13 34:14 35:14 responding 26:1 35:10 38:5,7 68:7 response 5:21 6:22 18:11 21:17 22:5 28:15 31:2 32:18 34:6 35:4,12,22 36:3 40:6 40:9,10,19 41:10,18 41:20 48:17 56:12 57:14,19 58:9 63:12 116:6 138:1 responses 7:3 responsibilities 143:16 responsibility 49:5 142:16 144:5 responsible 126:20 142:20 rest 85:8 131:13 restructure 24:10 result 24:8 43:18 73:22 74:3,7 108:13 111:20 resulted 20:19 29:14 resulting 4:19 8:9 35:8 results 11:9 12:16 53:4 147:13 retaliation 134:7 retired 134:17,18 retool 113:11 retribution 52:3 review 29:1 30:21 42:18 47:5,12 53:15 58:14 73:21 78:7,9,12 79:2 87:21,21 88:21 89:8 96:3,18 147:13 150:6 reviewed 5:11 145:22 reviewing 96:10 reviews 23:6 66:6 78:3 79:8 113:18 146:3 147:17,19 revise 39:12,18 40:4,22 41:7,15 43:9 revised 67:2 revising 76:18 revisions 6:6 65:3,16 Richard 1:15 3:12 Richmond 1:3,19 2:14 4:14,21 5:20 7:10 8:16 10:1 11:20 13:18 15:3,5 16:11 17:11 19:2,12 20:10 22:4,12 23:9 32:5 33:13,16 34:3 43:3,9,20 46:10 53:8 64:1,13 69:20 71:10,14,21 91:2,5,12 92:4 94:4 98:14 99:2 99:4,22 101:2,7,8 102:3,10 104:21 108:14,18,20 113:14 114:17,17 117:19,20 119:14 124:2 130:13 131:6 133:8 137:18 138:18 139:11,13 Richmond's 76:21 Rick 120:11,13 ridiculous 103:3 right 3:9 4:14 17:6,11 35:20 55:14 58:18 61:21 63:19 81:10 91:7 102:20 105:17 105:17 109:17 110:11 110:20,22 116:10 118:9 121:21 123:10 125:9 134:2 148:17 149:2 rights 99:19 116:7 131:12 rigorous 9:14 23:5 rigorously 48:6 ripped 27:19 risk 6:11 14:10 24:1,12 30:7 37:3 49:8 75:13 risking 128:9 risks 5:16 road 114:3 robust 24:12 Rogers 72:20 role 19:17 room 13:1,7 90:19 131:2,7 138:5,16 root 44:18 66:6 74:5 91:18 117:8 routine 25:2 143:12 RP 40:4 rule 66:19 rules 5:9 6:6,13,16 57:4 125:9 141:2 run 56:17 107:9 109:3 110:6 running 17:22 26:10 50:14 56:17 57:4 110:9 rupture 22:13 29:13 34:12 35:9 39:15 40:2 40:17 139:11 ruptured 28:1 S S 3:1 safe 35:17 109:13 110:5 safeguard 77:8 safeguards 23:7 66:10 77:10 safely 38:11 109:3 safer 5:10 23:5 24:5 30:6,16,18,20 44:11 44:22 46:11 47:6,10 48:8 73:15 74:12 77:3 111:15 128:11,11 131:9 141:9 safety 1:1,9,11,12,12 1:22 3:6 4:5,7 6:7,11 6:13,16,21 8:11,13,14 8:20 9:6,8,9,12,15,19 12:20,22 13:6,22 14:4 14:7,9,22 15:19,22 16:4,6 17:2,4 18:9 19:2,4 20:3 23:18,21 24:8,11 28:19 31:1,9 33:15 38:14 42:5,6 43:5,10,18 46:13 49:4 49:20 50:1,17,19 51:1 51:3,5 52:9,21 53:14 53:19 55:5 57:8 62:20 63:1,2,16 64:7,12,16 64:19,21 65:3,4,12 66:4,15,17 71:13 73:6 73:7,11 74:15 75:7,12 76:17,21 77:2,5,8 80:9 81:16 82:10,16 82:16 83:4,9 84:9 85:10 91:5,11 92:5,8 92:16,21 93:7,11,21 94:1,4 96:10 98:9,10 98:12 106:7,15,16,17 113:19 117:10,11 124:15,17 125:5 128:13 129:17,22 132:1 133:6,8 134:2 134:20,22 137:8,9 139:9 140:21 141:1 144:15 146:13 salaries 81:14 salary 82:1,1 sands 127:12 Sante 132:9 sat 78:12 satisfied 105:19 satisfying 86:15 save 110:17 128:22 saw 118:20 Sawyer 1:20 2:15 63:20 76:3,11,13,14 84:18 93:9 saying 93:15 103:2 105:20 114:22 133:1 138:10,12 says 3:22 75:17 91:12 113:5 114:6 115:20 scaffolding 26:20 27:9 scenario 38:16 scene 25:18 26:3 schedule 88:7 scheduled 87:16 schedules 87:17,19,21 87:22 school 120:21 122:8

(202) 234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. 168 scientists 17:10 scope 58:21 135:19 scoping 144:21 146:20 screaming 105:5 screen 39:6 searching 124:10 seated 150:5 Sebenza 120:9 second 5:10,13 14:17 17:5 23:12 81:6 88:19 103:22 111:11 116:1 128:16 139:18,21 144:13 147:22,22 148:2,7,8,9 150:14,15 Secondly 149:1 secretary 115:13 section 15:17,18 25:7 30:9 80:18 sections 75:18 sector 4:10 48:17 53:19 85:20 142:1 144:9 see 8:5,17 28:6 30:13 78:13 86:16 95:2,10 95:15 98:19,20,21 99:7 105:3,8 107:3,9 110:11 114:13 118:19 119:13,20 126:19,22 129:7,11 131:10,17 131:21 138:3,15 149:21 seeing 131:8 seek 4:21 seeking 39:8 seen 109:21,22 135:15 149:3 segment 25:15 Segundo 132:8 semi 122:5 Senate 87:7,11 89:6 148:14,19 sense 131:13 sent 26:2 100:14 130:15 sentiments 85:18 129:14 separating 29:9 September 87:13,18 sequence 24:17 series 145:13 serious 20:19 22:18 25:20 64:12 131:4 seriously 92:4 124:4 service 32:3 services 74:18 79:19 131:2 sessions 78:13 set 39:8 123:4 144:11 sets 83:5 setting 57:1 58:10 85:8 seven 66:10 severity 75:20 share 79:14,19 80:21 81:1 shared 12:7 101:18 126:12 sharing 21:19 70:19 sheet 12:5 90:18 shell 87:13 115:15 122:21 134:17 Shells 136:16 Shepherd 72:13 shop 138:10 short 12:3,4 103:9 120:4 short-term 110:8 shortcomings 23:18 shortly 84:12 show 117:13 showed 33:17 shown 30:8,10 71:16 129:5 shows 30:8 60:7 shut 18:12 25:16 26:7 27:18 33:4,7 36:6 38:21 50:14 57:21 58:2,11 59:8 99:19 101:20 108:12 110:10 110:21 116:5 123:3 134:2,5 shuts 123:6 shutting 17:22 25:21 Sibley 120:10,10 side 69:16 97:7 119:22 sidecut 25:13 30:10 sign 139:1 signed 12:10,11 90:4 90:19 94:9 97:16 136:3 significant 23:14 33:17 34:13 47:14 53:18 66:7 104:22 significantly 30:15 33:6 68:15 signing 94:10 silicon 30:13 36:17,19 37:1 39:15 40:2,17 41:5 56:5 Silver 145:12,17 147:3 similar 4:9 25:11 32:15 32:22 36:6 45:9 52:20 95:13 simple 111:12 simply 5:17 single 68:5,11 136:5 sir 94:14 sit 63:18 88:22 site 13:22 38:20 sitting 137:5 145:6 situation 25:19 112:4 situations 136:7 six 66:9 68:18 Sixty 88:3 slide 30:8 slightly 109:18 small 25:3,20 26:18 31:15 94:19 131:22 smaller 147:7 smile 118:19 smoke 4:19 smoothly 143:19 snapping 125:3 Socialist 132:12 Society 7:8 38:8 41:13 solidarity 128:7 solidification 142:14 solvents 121:9 somebody 61:3,13 soon 75:10 93:1 123:5 sooner 59:2 sophisticated 17:8 sorry 87:10 91:9 147:18 sort 47:5 48:5,8 57:1 124:22 Soto 102:7,8 103:21 sought 22:19 sources 73:15 74:11 81:3 south 88:1,4 Southern 92:11 spaghetti 60:8 speak 22:8 97:18 117:17 123:17,21 127:16 139:1 148:20 speaker 135:7 speaking 44:7 specific 39:22 40:6 49:22 50:3 54:1 55:7 95:22 109:18 specifically 4:8 36:22 50:21 51:13 73:16 75:4 specifics 140:17 speed 141:4 spell 94:15 104:9 108:2 123:13 spelled 125:17 130:10 spent 112:11 141:22 143:19 spoke 135:7 sponsored 69:6 spray 27:15 spread 28:2 60:1 spring 16:2 Springs 132:9 staff 1:14 3:15 12:1 13:20 18:7 33:16 64:5 67:15 71:17 72:9,10 73:1 87:20 93:20 98:22 104:18 106:19 109:21 113:4,18 114:6 115:7 142:6 143:4 144:17 145:5 145:21 146:3,17,21 147:12 staff's 109:11 staffing 67:13 76:5 stainless 30:17 stakeholder 65:10 stakeholders 73:8 stand 116:20 117:22 129:9 standard 15:16 26:1 65:17 66:2,12,21 67:2 68:10 76:2 143:8 standards 4:4 7:3,5 8:13 9:6,8,9,15 14:11 21:17 31:2 36:8 37:7 38:2,9 39:9,22 66:15 66:18,20 standing 108:19 116:19 128:6 stands 72:17 137:10 start 3:5 64:3 91:4 138:14 started 18:16 27:15,22 44:5 54:14 122:9,20 starting 145:14 state 5:8,11,14,19 6:4 11:15 15:1 23:10 24:9 70:1,20 82:19 87:14 89:8,11,16 92:11 107:19 111:5 126:15 128:5 136:15 141:2 state's 64:21 65:3 67:3 67:10,12 68:3 75:6 stated 7:20 150:14 statement 7:13,17 8:4 10:7 11:5 12:21 87:6 118:6 statements 2:3,22 11:5 11:6 13:14 22:6 64:2 86:14 90:4 states 36:16 53:17 132:14 statewide 64:11 static 24:2 stationary 73:15 74:11 81:3 statistics 132:13 statute 144:7 stayed 122:6

(202) 234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. 169 steam 120:20 steel 29:21 30:1,14,14 30:17 36:17 37:3,3,8 39:15 40:2,18 41:3 115:5,12 116:15,17 117:2 128:7 133:22 steels 30:4,16 step 58:5 123:10 131:22 136:12,13,13 stepping 119:22 127:9 steps 85:10,12 118:21 135:21 Steve 20:15 130:7 stick 138:3 stock 29:10 44:17,21 45:14,19 111:13 112:1 stone 127:9 stop 26:11 33:14,19 45:10 48:20 49:10 51:7,8,15,16,19,22 52:16 97:2 102:21 108:8 115:17,20 116:5 127:6,7,12 131:12 133:10 135:8 135:10 136:11,22 138:12 stopped 112:19 stopping 25:22 stops 123:3 store 115:1 strategies 35:22 strategy 35:4 streamline 144:11 Streamlining 146:12 streams 29:9 strengthen 39:9 65:6 strengthening 99:21 stress 57:13 stricter 131:17 strip 27:13 stripper 46:19 stripping 35:5 strive 124:22 strong 52:1 stronger 76:1 111:9 113:2 129:17 134:1,1 134:9,10 strongest 6:16 8:13 92:7 strongly 102:20 structure 34:8 48:22 49:4 142:3 structured 66:9 struggle 104:7 struggled 28:5 study 141:5 studying 124:4 stuff 79:22 Subcommittee 9:21 99:22 subject 59:10,11 submitted 66:22 submitter 42:12 submitting 66:14 subsequent 14:8 147:7 successful 120:1 successfully 69:6 suddenly 27:14,19 28:12 135:18 suffering 101:21 suggestion 111:10 suggests 32:15 sulfidation 22:22 29:16 29:17 30:2,7 31:13,16 36:10,16,18 37:4,8,11 37:21 39:10,13,21 40:11,15 41:4 48:2 54:7 56:4 59:3,14 61:7 78:17 79:4 113:6 sulfide 47:21 sulfur 29:19,20 44:16 44:20,21 46:15,20 47:3,20 112:10,20 113:5 114:1,15 138:11 summarizing 21:2 super 112:7 supervisor 8:8 105:3 105:13 124:11 Supervisors 43:2,7 72:22 81:11 90:22 91:3 support 8:14 9:13 67:6 67:18 99:16 102:20 106:13 108:6 116:19 117:1,13 118:6 133:21 supports 109:11 117:3 122:1,2 suppose 97:17 supposed 83:13 sure 5:15 13:9 51:4 61:6,16,21 62:17 79:7 80:16 96:5,11 100:10 101:9 104:17 109:2 113:18 118:14 149:21 surprise 95:19 surprised 95:10 surrounding 19:5 133:21 survey 53:4 surveys 33:15 34:2 51:6 52:9,18 susceptible 37:8 41:4 suspect 109:15 sustainable 109:3 sway 116:9 switch 113:10 switching 111:20 system 4:5 5:11,15 35:19 41:8 60:17 70:19,20 81:8 103:9 111:15 146:13 systems 4:5 18:19 24:5 37:17,19 41:1 46:11 47:7,10 48:8 73:16 74:12 77:3 121:5 T T-O-R-M 104:11 table 3:11 148:5,7,8 150:10 take 3:17 10:14 13:10 14:16 19:18 34:14 51:19 52:1 74:13 90:7 90:7 95:16 103:14 112:2 125:3 136:16 138:5 146:9 taken 5:20 33:3 63:12 85:5,7,13 95:18 96:3 118:21 takes 46:6 talented 62:4 talk 34:5 54:14 58:6 111:21 talked 50:7,21 54:2 82:22 talking 107:13 121:2 125:8 130:18 tar 127:12 targeted 70:16 task 65:1 75:7 tasks 88:21 142:17 team 4:12 11:13 19:15 20:12,13,17 21:1 39:1 44:7,7 49:18,19 84:19 88:8,8 94:19 141:11 team's 17:15 technical 24:4 29:1 42:18 50:18 55:20 58:18,19 60:15 62:4 62:14 67:22 81:10 109:18 123:19 129:2 145:19 146:1 147:13 technically 113:4 technicians 26:5 technique 30:18 technologies 5:10 44:12 technology 44:22 106:17,18 tell 12:21 54:19 96:13 117:19 119:20 122:4 138:2 temperature 25:9 33:2 34:22 35:2 45:22 47:1 48:1 78:17 temperatures 79:4 temporary 26:12 ten 31:14 67:13 81:21 94:21 125:1 132:9 138:7 tension 50:22 term 60:8 97:5 terminate 146:22 terminating 49:5 terms 69:18 72:16,18 76:4 85:9 Terry 72:13 Tesoro 80:5 115:15 testified 111:11 Texas 20:18 21:7 53:13 62:20 135:3 147:7 text 31:3 thank 9:22 10:9,11,15 13:17 19:5,7,9,10,22 20:1,6 21:12 44:2,4 48:9,13 49:14,15,17 63:6,7 64:4,5 71:5,7 71:11,17 76:6,9,14 84:17 85:13,14,17,22 86:2,4,11 90:2,17 91:11,16 94:6,8 97:11 97:13,14,22 98:14,16 98:21 100:12 102:2,4 102:6 103:17 104:4,8 104:17 107:17,21 108:1,21 109:4,6,8 115:2,4,9 116:12,14 117:5,13 118:1,11,17 120:5,7 123:6,8 125:11,13 126:3,7 127:15,16,18,22 128:22 129:2,4 130:3 130:4,6 132:2,4 134:11,13 138:17 139:3 150:6 151:15 thanking 71:12 91:4 thanks 68:14 91:10 94:3,5 98:13 102:3 141:10 theirs 75:1 thickness 42:20 thin 29:15,18 thing 19:21 55:3 57:3 74:22 80:4 89:19 100:16 101:7 109:16 113:3 123:4 136:5 things 47:13 48:5 50:14 51:15 52:4,8,11,13,18 57:17 58:17 78:6 80:7

(202) 234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. 170 80:8 82:7,14 84:4,6 99:11 107:15 113:4 114:12 119:2,3 121:1 121:18 122:12 124:2 124:10,19 125:2,3 126:11 130:1 133:2 134:21 135:17 137:7 think 3:4 19:15,17 24:18 49:21 50:2 52:5 53:7 55:2,9 57:7,9 58:4,5 60:6,16,18 61:2,13 62:1 71:14,15 72:9 76:2 84:4 85:5,7 85:20 86:18 91:12 92:1 93:4,15 95:1 99:5,11 100:5,17 103:4 107:5 109:21 110:19 118:18 123:18 124:3 125:7 128:21 129:19 135:6 136:4 136:12,20 137:3,12 139:2 148:16 149:13 149:22 thinking 58:16 63:2 94:9 101:17,19 thinned 25:13 26:19 thins 30:14 third 4:12 5:2 11:9 14:15 21:14 44:10 92:20 104:20 144:19 thorough 23:6 68:17 71:18 97:22 108:22 126:5 130:18 thoroughly 84:5 thoroughness 91:17 thought 53:5 thoughtful 91:19 93:5 threat 131:4 three 11:15 12:12 30:21 65:19 66:5 68:6 81:18 81:22 85:11 108:3 113:22 139:1 140:13 145:8 146:17 throughput 45:21 48:4 throw 138:5 Thursday 31:6 ticking 114:20 Tillema 20:13 Tim 127:20,22 time 7:11,14 8:6 10:9 10:12 11:3,21 17:6 24:20 29:18 30:15 31:18 47:2,3 68:3 79:6 85:20 89:17 96:7 96:19 99:3,7 104:20 105:15 108:12 110:2 110:17 114:15,20 115:1,22 119:1 120:14 121:9,12,16 122:16 123:15 125:3 127:15 130:20 131:8 139:5 143:19 148:22 149:2,5 timely 33:3 71:2 timer 123:14 times 89:10 135:14 tip 26:17 tireless 141:11 Title 89:13 titled 15:19 TKC 112:8 today 3:9 45:10 67:14 106:3 112:3 113:14 113:15 137:10 today's 4:11 5:2 6:18 100:19 told 136:8 tolerated 33:9 Tom 71:22 tonight 10:20,22 15:3 18:7 20:7,16 21:2 94:20 117:16 118:18 122:14 126:13 151:11 tonight's 16:15 tool 89:21 105:2,3 107:18 top 107:1 110:6 Torm 104:8,10 Tosco 8:9 45:6,15 51:12,13 111:19 total 67:10 68:18 70:3 totaling 69:18,19 totally 106:13 150:1 touched 50:4 56:11 tower 25:4,17 27:22 29:5,7 tower's 25:8 town 119:7 towns 119:21,21 toxic 20:19 toxicity 38:16 track 42:4 trade 123:1 tragedies 8:9 tragic 140:19 train 112:6 training 67:18,22 68:1 69:7 70:4,13 103:14 106:18,20,22 transcript 1:22 94:15 104:9 transition 109:4 transparency 91:18 149:12 trapped 28:12 trauma 101:22 travel 123:5 treasurer 115:13 treated 127:4 130:14 treatment 4:21 22:20 tremendous 104:19 107:13 trend 23:14 tried 26:13 44:20 74:13 trigger 48:5 triggered 46:15,16 47:13 trip 19:11 Trombettas 1:19 2:13 63:15 64:3,4,10 71:8 80:1 82:22 86:20 87:5 87:10 true 55:6 100:10 124:16 135:1 149:9 truly 5:16 trusted 133:7 try 26:8 107:8,9 118:12 trying 81:3 82:3,12 103:5 124:6 Tuesday 114:2 turn 16:14 76:3 turnaround 6:14 17:17 32:6,7 42:9 55:15 56:14 57:6 59:12 61:10,12 87:1,16,19 88:2,7,8,10,13,17,20 89:4 90:1 135:18 turnarounds 32:5 56:16 87:8,12,16 89:8,17 135:16 turning 103:10 turns 135:7 two 4:22 5:1 6:19 13:2,5 13:5 17:2 19:13 23:2 26:21 27:4,8 28:9 33:6 42:22 44:8 52:7 66:4 68:6,13,19 69:1 69:17,18 77:1,19 82:5 83:5 87:22,22 88:4 113:4 124:2 141:12 144:18 145:11 146:14 type 16:6 44:14 45:1 46:2 47:18,20 49:13 69:19 83:5 types 58:22 typical 30:3 typically 68:9 U U-A-R-D-O 97:20 U.S 1:1,9,11,11,12,22 ultimately 4:7 21:4 29:11 32:10 34:15 35:8 112:6 unable 24:2 28:6 unacceptable 9:4 49:8 unanimous 140:13 underlined 133:17 underneath 27:3 understand 12:10 18:5 75:12 86:21 89:12 110:7,8 134:22 137:7 understanding 18:11 31:16 97:1 101:16 124:6 149:4 underway 141:6 unfortunately 8:2 20:17 98:5 102:15 131:6 Unified 70:5 union 108:8,17 120:20 132:11 133:13 136:6 136:7,10 unions 81:11 100:7 136:12 unique 89:9 unit 17:22 18:1,12 22:14 24:22 25:21 26:8,10,19 27:18 32:16 33:4,7,10 36:5 38:21 47:14 50:14 57:22 58:2,12 59:8 61:20 63:17 64:12 67:13,16 68:11,15,18 69:17 70:9 87:15 101:20 110:9 112:8 Unit's 67:18 United 53:17 115:5,12 116:15,17 117:2 125:20 128:7 132:14 133:22 units 17:12 74:9 95:13 unnecessary 35:18 144:1 unsafe 52:16 110:21 112:16 updated 143:12 144:14 144:15 146:16 updates 22:4 83:12 upgrade 31:20 37:2 119:4 upgraded 30:19 upgrades 8:21 36:13 upgrading 54:8 uplift 131:10 urge 16:12 146:8 150:3 use 5:9 15:9 24:4 33:13 77:16 100:18 106:17 useful 19:2 134:21 135:11 users 36:22 39:22 40:5 40:8,18 41:2,17 usually 68:11 88:15

(202) 234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. 171 USW 108:7,19 118:5 Utah 145:12 147:4 utilizing 51:7 V V 120:8 valuable 85:21 value 42:20 104:3 valve 25:16 valves 122:17,18 vapor 22:16 27:3,5,5,20 28:2,10 varied 37:22 various 16:4 37:9 54:15 60:9 Velasco 72:10 vent 27:22 verbiage 137:8 verification 37:17 40:22 68:20 69:13 version 146:16 149:13 versus 56:16 57:4 137:9 Vice 72:2 video 24:19,21 videos 134:20 139:15 view 119:19 140:19 vigilance 103:14 132:1 vigilant 103:15 vision 101:17 vocabulary 119:11 voice 62:21 126:1 voices 62:17 63:4 volume 50:16 voluntarily 10:16 vote 2:20 12:15,16 14:19 22:9 91:13,14 139:5 140:3,13 149:3 150:22 votes 140:13 149:16 voting 149:4 vulnerable 130:21 W W-A-L-C-E-K 130:10 wait 150:4 waiting 144:17 wake 57:18 Walcek 130:8,9,9 132:4 wall 28:18 29:14 30:10 walls 25:12 29:17 want 9:22 14:16 62:8 71:17 72:17 76:6 80:16 85:11 86:6 91:16 93:15 97:21 99:16 100:11,16 102:9 104:17 106:7 107:3,20 113:3 123:21 124:2,12 126:7 127:15 138:3 138:13,15 149:20 wanted 72:8 108:16 109:17 118:5 119:3 123:21 125:22 129:1 129:1 131:15 warranted 25:21 Washington 135:4 wasn't 18:12 19:12 56:1 72:12 82:14 123:11 123:17 watch 16:12 water 21:9 27:11,14 way 25:17 28:7 32:22 34:17 38:22 49:21 52:5 107:1 111:19 124:10 134:9 140:16 149:3 ways 14:2 64:15 110:7 we'll 12:3 63:8 79:11 90:12 139:5 we're 11:4,7 45:9 61:2 79:6 80:22 82:3,5,12 83:3 84:11,15,22 96:6 97:17 99:1 103:14 105:20,20 124:20 130:20 134:9 136:21 138:6,18,18 148:16 we've 60:1 74:13 78:5 79:3,17 80:4 83:2 84:4 93:9 105:11 109:21 110:4 116:19 137:5 138:13 wearing 121:2 wears 121:5 website 5:5 31:6 WEDNESDAY 1:7 week 84:14 88:17,19 93:8 weeks 67:21 68:13 106:5 148:15 welcome 2:3 3:5 90:20 went 17:7 57:9 90:10 112:15,18 114:17 119:7 120:20,21 122:5,20,21 130:19 151:18 Wesley 94:12,12 West 7:22 130:20 Western 1:16 2:8 11:8 20:7 White 116:15,15,16,17 118:3,4 Whitmore 7:15,18,19 7:21 10:12 Wiber 118:13 wide 9:20 53:9 92:11 96:1 127:14 willing 116:7 willingness 117:21 win 137:11 winding 92:19 Wingard 20:15 wish 119:18 witnesses 28:17 won 112:21 wonderful 137:20 138:14 wondering 56:19,21 62:5 119:15 Woods 147:4 word 138:11 wording 39:5 work 10:13,14 33:14,20 45:10 48:20 51:7,8,15 51:16,19,22 54:15 60:9 71:19 72:8,15 73:1,6,9 74:21 76:7 79:21 80:18 86:8 89:11 94:3,18 97:2,22 98:13 99:2 102:21 103:7,18 104:19,19 106:9 108:8 109:20 110:21 112:16 115:10 115:17,20 116:5,12 116:18,21 117:20 119:20 120:4,4 128:10,21 129:2,18 130:12 133:4,10 135:11,19 136:11,19 137:6 138:12 141:11 149:19 worked 61:11 72:9 76:16 77:17 80:1,6 94:19,22 103:10 117:6 136:7 142:14 worker 8:20 64:16 108:11 132:19 133:12 136:4 137:5 worker's 99:19 100:18 102:20 workers 4:17 9:12,16 10:15 19:4 26:20 28:18 49:7 51:18 52:2 65:12 99:14 100:7,13 100:14,20 102:18 106:9,10 107:1 108:6 108:9,11 109:13 110:21 111:19 112:13 112:15 115:5,12,14 116:2,15,17 117:3,15 118:9 128:7,8,13 130:2 131:12 132:2 132:11,12,14,18 133:5,11,12,20,22 134:6,10 135:14 136:1 138:2 workforce 9:20,22 43:13 working 27:2 64:15,19 66:13 70:11,15 73:5 75:6 77:18 79:17 81:11 82:5 85:9 100:2 108:14,17,20 118:8 122:20 142:9 world 15:9 16:5 100:19 108:6 110:1 126:10 127:14 136:17 137:10 worsened 27:14 33:6 35:8 worst 38:16 wouldn't 95:7 119:9 wow 96:4 write 119:5 writing 98:3 110:16 written 14:19 38:2 88:11,14 95:5 wrong 122:14 130:19 wrote 50:18 111:11 X Y yards 17:12 year 16:3 30:15 31:14 66:16 67:9 68:7 69:16 73:4 80:5 87:14,17 91:4 109:20,20 120:20 132:10 135:22 136:1 years 21:10 25:12 48:16 73:17 81:18 95:8 101:9 105:5,12 105:12 122:5 125:1 134:19 138:7,7 141:12 142:1 144:9 144:18 149:9,18 yelling 105:5 yellow 12:5 90:18 young 103:15 Z zinc 145:14 147:10,14 zone 35:17 59:19 0 1 1 81:19,20,21 1,530 68:21 1,605 69:18 10's 129:5 10,800 29:6

(202) 234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. 172 100 31:20 32:8 37:1 54:7 107:12,14 135:9 100's 129:6 12 59:9 81:19 147:2 125 107:12 13 2:4 126:14,18 130 35:1 1300 87:8,11 13650 14:6 139 2:20 14 25:5 148 2:22 15 30:15 67:21 87:14,18 87:19 94:21 131:7 15,000 4:20 9:2 22:18 100:14 130:15 15th 87:13 160 70:4 19 2:4 22:15 28:3 100:13 147:5 1945 122:7 1975 105:6 1980's 114:8,9 1999 45:7 51:13 52:5 111:18 2 2-1 151:12 20 65:10 100:13,14 134:19 20's 129:6 2000 143:3 2001 40:4,19 41:11,19 60:3 120:17 2002 143:3 2007 32:4 2008 33:16 52:9,15 2009 145:9,12,14 147:2 147:2,5 2010 32:15 33:1,16 52:9 52:15 132:15 145:9 145:14 147:9 2011 17:16 32:5 59:12 2012 4:13,22 8:15 11:16 14:15 16:18 22:11 24:22 32:4,12 53:3 64:9,14 67:14 91:19 106:4 130:16 139:12 147:8 2012031CA 139:10 2013 16:21 23:4 29:2 67:4 68:2 2014 5:13 14:20 16:10 23:13 64:20 65:9 68:13 69:16 70:3 73:9 81:19 2015 1:7 70:10 81:20 87:18 138:11 139:16 2015-01 143:22 146:12 2016 67:2 81:22 87:20 21 2:8 22 144:14 146:15 147:9 149:14 23 39:11 24 39:18 25 40:12 48:16 60:6 81:17 95:8 26 40:21 27 41:6 67:14 28 1:7 40:3 41:20 139:16 29 41:15 3 3 2:3 3:50 25:1 30 42:2 88:12 300 17:12 306 69:1 31 42:7 32 42:16 39 105:12 4 4 25:12 30:9 147:2 4-sidecut 22:13 25:8 29:3,13,22 31:19,21 34:10 4,500 132:14 40 105:5,12 121:22 146:19 40-1-1 121:22 45 121:16 450 78:18 460 28:14 5 5 14:20 108:7,19 115:12 116:17 117:3 118:9 128:8 134:18 147:8 50 142:1 144:9 500 35:2 52 29:14 32:2 54 89:6 570 37:12 40:13 571 37:14 39:18 574 37:16 41:7 578 37:17 40:22 6 6 22:11 24:22 32:3,12 64:8,13 106:4 139:12 6:30 3:2 28:9 600 68:1 64 2:13 640 25:9 29:4 678 47:9 6th 32:14,19 7 7 15:17 71 2:14 750 45:17 76 2:15 8 8 89:13 80 68:12 80's 120:14 122:19 802 69:2 88 121:19 122:21 9

NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W. (202) 234-4433 WASHINGTON, D.C. 20005-3701 www.nealrgross.com

C E R T I F I C A T E

MATTER:

DATE:

I hereby certify that the attached transcription of pages to inclusive are to the best of my belief and ability a true, accurate, and complete record of the above referenced proceedings as contained on the provided audio recording.

173 Chevron Richmond Refinery File 01-28-15 1 173

FD06478 | 2015_美国_DuPont La Porte 设施 有毒 化学品 泄漏 - DuPont La Porte Facility Toxic Chemical Release__最终报告.pdf

分类:06_境外及港澳台调查报告 | 年份:2015 | 地域: | 严重程度: | 场所:化工/石化 | 起火原因:燃气/爆炸 | 来源格式:pdf

30015_DuPont Public Meeting (9-30-2015) Chair Sutherland, Member Ehrlich, Member Engler, Member Kulinowski, Donald Holmstrom, Dan Tillema, Tamara Qureshi, Steve Cutchen, Kara Wenzel

www.gmrtranscription.com

1 Chair Sutherland: I’ll call the meeting to order. Good evening, and welcome to this public meeting of the US Chemical Safety Board, or the CSB. I am Vanessa Allen Sutherland, Chairperson and Board Member of the Chemical Safety Board. And joining me today are Board Members Manny Ehrlich, Kristen Kulinowski, and Rick Engler. Also joining is our Acting General Counsel, Kara Wenzel, and member, uh – members of the CSB investigative team. The CSB is an independent, non-regulatory, federal agency that investigates major chemical accidents at fixed facilities.

The investigations examine all aspects of chemical accidents, including physical causes related to equipment design, as well as inadequacies in regulations, industry standards, or safety management systems. Ultimately, we issue safety recommendations, which are designed to help prevent similar accidents in the future. The purpose of this evening’s meeting is for the CSB investigative team to present to the Board findings and draft recommendations from their ongoing investigation into the fatal methyl mercaptan release that occurred at DuPont’s La Porte facility on November 15, 2014.

At this time, we will have a moment of silence to remember the four victims killed as a result of this accident. They are Wade Baker, Crystal Wise, and brothers Gilbert and Robert Tisnado. Thank you. I’d like to thank the families and friends of the victims for both your patience and your attendance. At this time, please allow me to go over this evening’s agenda. First, we will hear from the DuPont investigation team. Following the team’s presentation, the board will be given an opportunity to ask the team questions. Thereafter, we will have a public comment period and then a vote on approving the draft recommendations.

Before we begin, I’d like to point out some safety information. Please take a moment to note the locations of the exits from this meeting room, uh, three in the back and several along the walls. I also ask that you please mute cell phones so that these proceedings are not disturbed. The November 15, 2014, accident at DuPont’s La Porte facility killed four workers when highly toxic methyl mercaptan was released. A CSB team has spent the last 10 months, 7 of them onsite in La Porte, conducting their investigation. They have uncovered several weaknesses or failures in DuPont’s safety planning and procedures.

30015_DuPont Public Meeting (9-30-2015) Chair Sutherland, Member Ehrlich, Member Engler, Member Kulinowski, Donald Holmstrom, Dan Tillema, Tamara Qureshi, Steve Cutchen, Kara Wenzel

www.gmrtranscription.com

2

DuPont is one of the world’s oldest and largest chemical manufacturers and has long been considered a safety leader. But this is the third CSB investigation into a fatal accident at DuPont in the past five years. One worker was killed in 2010 when a hose carrying phosgene gas burst at a Bell, West Virginia plant. Later that year, a welder perished in an explosion at a Buffalo, New York facility. At the La Porte plant, DuPont makes insecticides, herbicides, and other products in a – in separate units. Methyl mercaptan is a raw material of Lannate, which is a top selling, broad spectrum, insecticide.

Production of insecticide has not resumed at the La Porte facility. After the 1984 release of methyl isocyanate at Union Carbide’s insecticide plant that killed thousands in Bhopal, India, DuPont La Porte made proactive changes on how it handled a different chemical also used to make Lannate, methyl isocyanate, or MIC. The facility moved production of MIC to an open building and installed equipment to destroy toxic chemical leaks. Du Pont didn’t broadly adopt those measures for methyl mercaptan and chlorine, however, even though they are also toxic chemicals in the building used to make the insecticide.

Tonight, we are going to hear an update and interim recommendations from the investigation team. DuPont has agreed to address these proposed recommendations as part of its plan to safely restart insecticide production.

We believe the recommendations describe what the company should do to protect the workers and the public at the La Porte – La Porte facility. That being said, I’d like to stress that the investigation is ongoing. Although these interim recommendations will improve safety at DuPont La Porte, there are several additional significant process safety issues that the team wishes to address before the Board issues a final report.

Farmers and the global economy rely on the advanced insecticides and herbicides made by DuPont at La Porte. But these products must be made with the utmost regard for the safety of workers and the general public. DuPont has long been regarded as an industry safety leader, but their string of recent fatal accidents tells us is that even the best can slip into complacency. Process safety deficiencies cost four families their loved ones and eroded public confidence in DuPont. My fellow Board Members and I are determined to make sure this does not happen again. And we will

30015_DuPont Public Meeting (9-30-2015) Chair Sutherland, Member Ehrlich, Member Engler, Member Kulinowski, Donald Holmstrom, Dan Tillema, Tamara Qureshi, Steve Cutchen, Kara Wenzel

www.gmrtranscription.com

3 all look to the day when DuPont has taken actions to restore its once envied reputation for safety.

If anyone in the audience wishes to comment publicly after the investigators’ presentation, please sign up on the yellow sheet in the check area to the left of the entrance. And I will call your name at the appropriate time. I will first call those who have signed up and then open the floor to anyone who wishes to speak. But please note that we will have to limit public comments to three minutes each just given the time and the need to get to the vote. I will now recognize my fellow Board Members for any opening remarks or introductions.

Member Ehrlich: Thank you. Good evening. I’m Manny Ehrlich. I empathize with how difficult this must be for you tonight and hope that you’ll accept our sympathies and condolences, and mine personally. Thank you for being here.

Member Kulinowski: Good evening, Kristen Kulinowski, new Member of the Board. I’m pleased to be back in Houston where I once lived – um, lived for 13 years, although sad that it has to be for such a tragic occasion. I, too, extend my sympathies to the families and friends and look forward to, um, deliberating on the findings of our investigation team.

Member Engler: I’m Rick Engler. My sympathies also to the families of this tragedy. I also want to thank the workers for their cooperation, the national union that represents them, International Chemical Workers’ Union Local 900C, and to their active engagement in the ongoing investigation. And finally, I would like to thank the DuPont Corporation for their cooperation with our investigation, their continued commitment to not reopen the facility until critical health and safety matters are addressed while, at the same time, continuing to employ and pay their employees.

Chair Sutherland: Thank you, Board Members. At this time, I would like to introduce the investigation team. Mr. Don Holmstrom is the Director of CSB’s Western Regional Office located in Denver, Colorado. Mr. Holmstrom joined the CSB in 1999 and has led and supervised a number of CSB investigations, including the 2005 BP Texas City investigation, uh, which was an explosion and fire. Prior to coming to the CSB, he worked for 18 years in the oil refining industry, and he has extensive experience in oil refinery operations, Process

30015_DuPont Public Meeting (9-30-2015) Chair Sutherland, Member Ehrlich, Member Engler, Member Kulinowski, Donald Holmstrom, Dan Tillema, Tamara Qureshi, Steve Cutchen, Kara Wenzel

www.gmrtranscription.com

4 Safety Management, occupational health and safety, and incident investigation.

You can raise your hand, Don. Mr. Dan Tillema is the lead investigator and has 20 years of experience in the petrochemical industry in process, research and development, and operations engineering prior to joining the CSB. While in industry, he developed a strong process safety background and has extensive experience with plant commissioning and start up, process hazard analysis, incident investigation, process simulation, and relief system design and has been in Houston for 10 months working on this investigation. Mr. Steve Cutchen joined the CSB in 2011. He has over 33 years of experience in the chemical industry in process safety and process control engineering.

Over the last 10 years, he has specialized in incident investigation, risk analysis, and safety instrumented systems. In addition to technical roles, he held various management positions ranging from technical supervision to worldwide technology management. Ms. Tamara Qureshi, or Tammy, joined the CSB in 2014. She has a background in both chemical engineering and law. Prior to law school, she worked for an environmental engineering consulting firm. In that position, Ms. Qureshi worked on all aspects of environmental cleanup, including design and site safety. Prior to joining the CSB, she also was a district attorney. Mr. Holmstrom, please begin your presentation.

Donald Holmstrom: Good evening. Thank you for attending tonight’s presentation on the DuPont La Porte investigation. My name is Don Holmstrom, and I’m the Director of the Chemical Safety Board’s Western Regional Office and the supervisor of the investigation. Tonight, three investigators will be presenting their findings associated with the interim recommendations from the DuPont La Porte investigation. The speakers are Team Lead Dan Tillema; Attorney Investigator Tamara Qureshi; and Investigator Steve Cutchen.

Uh, I want to personally thank Dan, Steve, and Tamara for their excellent work, their diligence, and their sacrifice for being away from their family, in many cases, for weeks on end. Thank you very much. I will now turn over the presentation to Dan Tillema. Dan?

30015_DuPont Public Meeting (9-30-2015) Chair Sutherland, Member Ehrlich, Member Engler, Member Kulinowski, Donald Holmstrom, Dan Tillema, Tamara Qureshi, Steve Cutchen, Kara Wenzel

www.gmrtranscription.com

5 Dan Tillema: Thank you, Don. My name is Dan Tillema, and I am lead investigator for the DuPont La Porte investigation. We will begin our presentation this evening by showing an animation of the November 15 DuPont incident. We will then – we will then present our investigation activities and the events that brought us here today. After that, we will discuss our key findings and our proposed pre-start-up recommendations. Then we will describe our potential investigation pathways. Our presentation will be followed by Board Member questions and public comment.

At the end, the Board will have the opportunity to vote on adopting the interim proposed recommendations. I will now show an animation depicting the November 15 DuPont incident.

[Video]

Dan Tillema: Since 2010, the CSB has deployed to three fatality incidents at three separate DuPont facilities. The first was at Bell, West Virginia, in January 2010, which was a toxic chemical release. A total of three releases of highly hazardous chemicals occurred over a two-day period. One fatality occurred as a result of exposure to phosgene. The second DuPont deployment was to the Yerkes chemical site, in Buffalo, New York. This incident occurred less than eight months after the first. One fatality and an injury occurred as a result of a hot work incident.

Today, we are presenting interim recommendations for a third DuPont deployment, our ongoing investigation of the La Porte site. Last November, a release of 24,000 pounds of methyl mercaptan resulted in 4 fatalities, 3 personnel injuries, and 3 other personnel chemical exposures. While we have been onsite investigating this incident, there have been other smaller releases of highly toxic chemicals at La Porte, including chlorine and hydrogen fluoride.

The decision by the CSB to deploy to La Porte was based on our incident evaluation protocol, with important aspects being the seriousness of the incident itself with four fatalities, plus other injuries, and the fact that this was the third fatality incident for DuPont. This is the first time we’ve investigated one company for three separate fatalities, each at a separate facility. The investigation into the 2005 explosion of the Isomerization Unit at what was then the BP Texas City Refinery was, in many ways, a milestone for the Chemical Safety Board.

30015_DuPont Public Meeting (9-30-2015) Chair Sutherland, Member Ehrlich, Member Engler, Member Kulinowski, Donald Holmstrom, Dan Tillema, Tamara Qureshi, Steve Cutchen, Kara Wenzel

www.gmrtranscription.com

6

A point of emphasis was the distinction between personal safety, often described as slips, trips, and falls, from process safety, which addresses the control and prevention of fires, explosions, and accidental, uncontrolled releases of hazardous substances. Process safety can be further simplified as the management systems that ensure that hazardous chemicals stay inside the pipes and equipment. DuPont has a good personal safety record. But the incidents we have investigated raise concerns about their process safety performance. The CSB deployed to La Porte the day after the incident.

As we often do, we deployed a large response team consisting of almost half our investigative staff. Other agencies also deployed, and we coordinated our activities. I would like to note that our investigation team has had great cooperation from other groups and agencies throughout the duration of this investigation, including: DuPont and their employees; the International Chemical Workers’ Union Council of the United Food and Commercial Workers and Local 900 C; KBR, a resident contractor and their employees; and federal OSHA, especially Makiba Hagar, Richard Nickerson, and Althea Powell.

We worked especially closely with these OSHA investigators, sharing our thoughts and findings as much practicable. Again, as we typically do, the initial deployment team was eventually pared down to a smaller investigation team, as most deployment investigators returned to their investigation assignments. We now have three investigators assigned. Since the beginning, we have held regular meetings with DuPont La Porte management and with local union leadership. CSB investigations go way beyond the immediate causal factors of an incident, delving into pre- conditions, management, organizational, industry, and regulatory causes.

This requires a lot of information, and you can see this reflected in the numbers for information we have reviewed. While this incident was not directly caused by equipment failure, there have still been tests to various plant equipment that have been carried out in order for us to fully understand the incident’s sequence of events. We mentioned the regular meetings with DuPont. One of the things we do when we are onsite is talk with the company about findings and potential recommendations as we identify corrective actions that can be taken. CSB investigators do not

30015_DuPont Public Meeting (9-30-2015) Chair Sutherland, Member Ehrlich, Member Engler, Member Kulinowski, Donald Holmstrom, Dan Tillema, Tamara Qureshi, Steve Cutchen, Kara Wenzel

www.gmrtranscription.com

7 want to wait until the end of our investigation to urge a company to implement needed corrective actions.

During our regular meetings, DuPont was cooperative and receptive to various opportunities for improvement. Many corrective actions that we have communicated during the course of the investigation have been accepted and incorporated into DuPont action plans. During the course of our investigation, CSB investigators were frequently told about pre-start-up plans and about potential restart dates. Ultimately, we learned from a DuPont manager at La Porte of a planned restart in August.

We were told that previously communicated corrective actions that we considered potentially critical pre-requisite – pre-requisites to a restart of the unit would not be implemented prior to the restart date. As a result, we interrupted the investigation to formally prepare pre-start up recommendations for Board consideration. I will now turn the investigation presentation over to Attorney Investigator Tamara Qureshi.

Tamara Qureshi: Thank you, Dan. My name is Tamara Qureshi. And as Mr. Tillema has indicated, I’m an attorney-investigator. Today, we are presenting these pre-start-up recommendations for the Board’s consideration. For each recommendation, we will discuss the findings they are based on. Included are recommendations in the following six areas: inherently safer design of manufacturing processes and facilities; worker safety in the manufacturing building; public and worker safety from the emergency relief systems; robust process hazard analysis; active workforce participation; and finally, public transparency and accountability.

First, I will discuss the findings that support our recommendations for using inherently safer design in evaluating DuPont’s manufacturing processes and facilities. The DuPont La Porte plant was once a leader in applying inherently safer design. It is well- known for proactive changes made to the facility after the devastating December 3, 1984 accident in Bhopal, India. Considered the worst industrial accident in history, thousands of people were killed during a release of methyl isocyanate, also known as MIC, at a Union Carbide insecticide plant. That accident triggered global changes throughout the chemical industry.

30015_DuPont Public Meeting (9-30-2015) Chair Sutherland, Member Ehrlich, Member Engler, Member Kulinowski, Donald Holmstrom, Dan Tillema, Tamara Qureshi, Steve Cutchen, Kara Wenzel

www.gmrtranscription.com

8

One of the changes was to use inherently safer design. By inherently safer design, we mean that it eliminates or reduces hazards to avoid or reduce the consequences of incidents. The DuPont La Porte site was one such facility that had changed its practices. The DuPont La Porte insecticide business unit also uses methyl isocyanate. After Bhopal, DuPont made modifications that implied inherently safer design principles for MIC. At the bottom of this slide is an important excerpt from DuPont’s actual design document for the MIC unit.

And it clearly shows how they applied inherently safer design principles by including an open building structure with equipment to direct potential leaks of toxic chemicals to an incinerator. As you can see here in this photograph of the MIC unit, DuPont implied inherently safer design principles through the use of an open building structure in systems to destroy leaks of highly toxic chemicals.

An open building structure and direction of toxic leaks reduces the hazards and consequences of a toxic leak because it minimizes the potential toxic chemical exposure to workers. DuPont’s capability to apply inherently safer design principles in this situation has been previously acknowledged by the Chemical Safety Board. However, DuPont has not applied these same principles with other chemicals that they classify as highly toxic and that are used in the insecticide business unit. Two chemicals that they classify as highly toxic are chlorine and methyl mercaptan.

Unlike the MIC used in the same business unit, DuPont did not effectively apply similar inherently safer design principles to these other insecticide processes and facilities. For example, highly toxic chlorine and methyl mercaptan are located inside an enclosed manufacturing building and not in an open building structure. Note the differences between the photo of the MIC unit with the open building structure in the previous slide to the photo here of the enclosed insecticide business unit manufacturing building. DuPont’s non application of inherently safer design extends farther than the manufacturing building.

Another example is pressure relief systems within the insecticide business unit. Displayed here are photographs of relief systems on the methyl mercaptan storage tank and the methyl mercaptan feed pump discharge. Both of these relief systems expose workers and

30015_DuPont Public Meeting (9-30-2015) Chair Sutherland, Member Ehrlich, Member Engler, Member Kulinowski, Donald Holmstrom, Dan Tillema, Tamara Qureshi, Steve Cutchen, Kara Wenzel

www.gmrtranscription.com

9 the public to potential toxic gas releases. These hazards will be discussed further in a separate section focused on pressure relief systems. The CSB is making a recommendation for DuPont to conduct an inherently safer design review prior to resuming insecticide manufacturing to evaluate the hazards created by the manufacturing building, and the discharge of pressure relief system with toxic chemical scenarios.

For an example, inherently safer design review for the building may answer questions such as, is an enclosed building necessary for this process? Can the stairways be opened up to eliminate trapping of toxic vapors? For the process, do you need an 18,000 gallon methyl mercaptan tank? Or, the relief valves, do they need to be routed to the atmosphere? Could they be routed to a destruction device to better protect the workers and the public? We are requiring that the results of the inherently safer design review be implemented to the greatest extent feasible.

The specific recommendation language can be found in the recommendation document. The next finding concerns a recommendation that addresses worker safety in the manufacturing building. For this recommendation, we’ll look at several different areas of focus, including the manufacturing building structure and other elements of the manufacturing building, such as the stairways, the ventilation system, and the air monitoring system. First, we will discuss the hazards associated with the building itself. There are different reasons for why a company might put a process inside a building.

However, when we investigated the manufacturing building structure, we found that there were no documents that explained its design function. The building serves no apparent, essential, manufacturing purpose. Companies in the industry, at times, choose to enclose highly toxic chemical manufacturing equipment inside specially designed containment buildings. The general idea with the containment building is that, if a significant leak of a toxic chemical would occur, the leak would be contained in the building, and the toxic vapor would be routed to a destruction device such as an incinerator or scrubber.

DuPont has stated that the manufacturing building is not a containment building. But given how it encloses highly toxic chemical manufacturing equipment, it can – it can be compared to

30015_DuPont Public Meeting (9-30-2015) Chair Sutherland, Member Ehrlich, Member Engler, Member Kulinowski, Donald Holmstrom, Dan Tillema, Tamara Qureshi, Steve Cutchen, Kara Wenzel

www.gmrtranscription.com

10 one from a worker and community – community hazards point of view. Industry has recognized that when containment buildings are used, there is a benefit to the community because it is less likely that the toxic chemical will travel offsite and impact the community. However, industry has also recognized that enclosing the leak within the building creates an increased hazard to workers.

The insecticide business unit manufacturing building introduces increased worker hazards similar to that of a formal containment building without the benefit. For example, if there is a toxic leak, it is trapped and concentrated inside. But these toxic vapors are not routed to a destruction device. Unlike a containment building, these hazards are not balanced by the benefit of providing risk reduction to the public. Instead, if the toxic vapors are collected, they’re discharged from the roof five floors up to the outside atmosphere and, in turn, potentially, to the public. Next, we will talk about the hazards associated with the stairways and the manufacturing building.

The manufacturing building stairways are the primary means to access equipment or to enter or exit the building. The stairways were not a safe haven for workers from toxic gases in the manufacturing building. Although workers routinely access the stairways, they are not connected to the building ventilation system and have not been evaluated for toxic gas hazards or oxygen- deficient environments. DuPont designed these stairways for fire escape. There are internal fire doors separating the stairways from the process equipment area, as you can see from the prior slide. These doors do not provide barriers to hazardous gases entering the stairways from the process areas.

The next area of focus is the manufacturing building’s ventilation system. As you can see in this simplified drawing of the ventilation system, the building is divided into two halves. On the left is the wet end where liquids are processed. And on the right is the dry end where powders are processed. On each side, fresh air enters through the louvers, is swept across the equipment, and up into the exhaust air duct. All of these exhaust air ducts from each of the floors and from each side of the building are collected into common headers. One for the wet end and one for the dry end.

The air is pulled through the ventilation system by fans mounted on the roof like the one shown here, which is for the dry-end fan.

30015_DuPont Public Meeting (9-30-2015) Chair Sutherland, Member Ehrlich, Member Engler, Member Kulinowski, Donald Holmstrom, Dan Tillema, Tamara Qureshi, Steve Cutchen, Kara Wenzel

www.gmrtranscription.com

11 There are many problems with the ventilation system that make it ineffective. The previous slide showed how the ventilation theoretically creates an airflow pattern. In actuality, there are short-circuited air patterns that prevent the system from working effectively. The wet end and the dry end each has its own ventilation fan. The ventilation system was designed with the idea that each half of the building would operate independently. Additionally, the two halves would be divided by closed fire doors.

When we discussed the stairways, you may recall there was a sign on the door, a fire door, saying to keep it closed. Similar doors separate the wet end and dry end, as you can see here. Although these doors also have signs to keep them closed, these doors are often propped open. Moreover, doors to the outside would also be propped open, further interrupting air flow patterns. There are also holes in the outside walls of the building that are not sealed. The open fire doors and the holes in the wall allow air into the building and adversely affect the airflow patterns within the building.

We have a short video clip, which illustrates the effect of these short-circuited air flow patterns. In the middle-top of the picture, there is a light bulb, around which is a cloud of steam. When you watch the video, as the camera zooms in, you will see that the steam is stagnant and not being swept towards an exhaust duct. As you will see in this video, there is not good ventilation even when the fan is in operation. The ventilation system had two design objectives. Preventing flammable and toxic conditions inside the building. The ventilation system, like other parts of the building, was designed to deal with chemicals that are flammable.

One of the values used is a Lower Explosive Limit. The limit they would use for methyl mercaptan would be 65 times greater than the amount that would be immediately dangerous to life or health. However, the ventilation system does not meet its toxicity design objectives to control contaminants to acceptable work place exposure levels. There are no documents describing how DuPont planned to meet this objective. And it is important to emphasize that this design objective is communicated to workers. It is written in the operating manual and the safety and occupational health section of the unit technical standards.

Workers reading this objective would reasonably assume that the ventilation system would protect them from a toxic release.

30015_DuPont Public Meeting (9-30-2015) Chair Sutherland, Member Ehrlich, Member Engler, Member Kulinowski, Donald Holmstrom, Dan Tillema, Tamara Qureshi, Steve Cutchen, Kara Wenzel

www.gmrtranscription.com

12 However, preliminary calculations indicate that even had the fans been running, the design objective of acceptable work place exposure levels could have not been met during this incident. There would have been insufficient ventilation to avoid a lethal atmosphere inside the room where the release occurred. The performance capability of that ventilation system in the wet end area is unknown because it has not been tested. A 2009 audit of the DuPont La Porte’s Process Safety Management system found that the ventilation was not being tested as it was supposed to.

The audit team created an action item to fill this gap. However, all that was required to close the audit action item was to create a periodic work order or dilution air flow testing. Two years passed before it was identified that testing had not occurred. Because DuPont technical did not understand the testing requirements, the ventilation system was not fully evaluated. Despite the 2009 audit finding, the flow rate and effective distribution of dilution air for the wet end fan was never tested. Moreover, only dilution air flow measurements for the dry end fan were taken. But there was no analysis— just measurements.

Finally, maintenance of the building ventilation fan as been ineffective. The ventilation fans are classified as process safety critical, or PSM critical equipment, meaning that their failure could result in a high-consequence event. Neither ventilation fan was operational at the time of the November 15, 2014, incident. The wet end fan and dry end fan both had poor reliability. The dry end fan had been down for five months since 2000 – June 2014 due to an electrical problem. The wet end fan was shut down on October 20, 2014, because it was making a noise significant enough that DuPont operators turned it off and wrote an urgent work order to have it repaired.

Despite the urgent work order, this fan required to ventilate the room where the release occurred was not fixed. The failure of these safety-critical fans did not result in additional safety precautions, such as special operating procedures, special emergency response procedures, worker access restrictions, or additional Personal Protective Equipment requirements. The final focus is the manufacturing building air monitoring system. One of the chemicals that the manufacturing building’s gas detector system monitors is methyl mercaptan. At the time of

30015_DuPont Public Meeting (9-30-2015) Chair Sutherland, Member Ehrlich, Member Engler, Member Kulinowski, Donald Holmstrom, Dan Tillema, Tamara Qureshi, Steve Cutchen, Kara Wenzel

www.gmrtranscription.com

13 the incident, there were three methyl mercaptan detectors located in the building.

Two on the first floor, one on the fourth floor, zero were located on the third floor, where the release took place. The design of the gas detectors did not effectively protect workers. They do not provide an effective warning. For example, there are no gas detector alert systems in the building. The only alarm is in the control room. Workers in the building have no independent way to know if a building gas detector has gone into alarm. Furthermore, there is no warning to prevent workers from entering the building if there is a hazardous atmosphere. A worker could enter the building without knowing that a gas leak has occurred and then become incapacitated before being able to react.

DuPont has designed a building with atmospheric monitoring to protect workers. They have done so with the analyzer house shown here, which is located in the same business unit where the incident took place. As you can see, there is a green light at the door. If it is not safe to enter, a local alarm sounds at the door, and the green light outside turns off. Unlike the manufacturing building, this DuPont analyzer house provides warning to workers to prevent entry into an unsafe atmosphere. DuPont’s response to a methyl mercaptan gas detector alarm is not sufficient to warn workers or the public.

Hours before the November 15, 2014 incident, multiple, highly toxic chemical gas detectors alarmed. Furthermore, methyl mercaptan releases on November 13 and 14 were picked up by methyl mercaptan detectors, but they were never reported as releases nor investigated as serious process safety incidents. DuPont’s methyl mercaptan detectors are intended to provide early warning of significant leaks with potential offsite impacts and do not protect workers from exceeding short-term exposure limits. The alarm point of the methyl mercaptan detectors is 25 Parts Per Million.

The alarm is set at the Emergency Response Planning Guide 2, or ERPG 2, which is where irreversible health effects begin after a one-hour exposure. This alarm point of the methyl mercaptan detectors is above the permissible exposure limit for workers. The OSHA permissible exposure ceiling limit is 10 Parts Pper Million. This means that workers should not be exposed to concentrations

30015_DuPont Public Meeting (9-30-2015) Chair Sutherland, Member Ehrlich, Member Engler, Member Kulinowski, Donald Holmstrom, Dan Tillema, Tamara Qureshi, Steve Cutchen, Kara Wenzel

www.gmrtranscription.com

14 greater than 10 Parts Per Million for any duration of time, even instantaneously. It is important to note that OSHA has recognized that this exposure limit is outdated. OSHA, instead, recommends companies use [inaudible] [00:55:13] or CALOSHA exposure limits of 0.5 parts per million.

To ensure worker safety inside the manufacturing building, the CSB is making pre-start-up recommendations to DuPont to conduct an engineering evaluation of the manufacturing building and ventilation system and implement corrective actions to ensure worker safety to the greatest extent feasible. In addition, the CSB recommends that DuPont document the design basis for the manufacturing building and ventilation system, and identify controls for highly toxic asphyxiation and flammability hazards. And, again, as we have emphasized, the specific recommendation language can be found in the recommendations document. I will now turn the presentation over to Investigator Steve Cutchen.

Steve Cutchen: Thank you, Tamara. My name is Steve Cutchen, and I’m an investigator with the Chemical Safety Board assigned to this DuPont incident. Next, we’ll discuss worker safety from emergency relief valve systems. DuPont has been in the process of implementing a five-year program at La Porte to validate that pressure relief systems comply with existing DuPont standards, process safety regulations, and industry standards and codes. Industry standards and codes and regulations for relief systems are well-established.

The American Petroleum Institute Standard 521 is included in this, as is the American Society of Mechanical Engineers Boiler and Pressure Vessel Code. On the regulation side, OSHA’s Process Safety Management Regulation is enforced with respect to these relief systems. DuPont’s five-year plan to evaluate relief systems is due to be completed this year, 2015. However, the work is only 35 percent complete. And the CSB has identified that the scope of DuPont’s program is not sufficient. It does not effectively evaluate relief scenarios. It also does not effectively evaluate whether relief system discharges are routed to safe locations.

As a result, the evaluation program does not effectively ensure the safety of workers or of the public. I have four examples of relief systems in the insecticide business unit that the CSB has identified as not meeting standards. The first is on the methyl mercaptan

30015_DuPont Public Meeting (9-30-2015) Chair Sutherland, Member Ehrlich, Member Engler, Member Kulinowski, Donald Holmstrom, Dan Tillema, Tamara Qureshi, Steve Cutchen, Kara Wenzel

www.gmrtranscription.com

15 storage tank. This is the tank that was involved in the November 15 incident. In 2002, DuPont evaluated the potential to exceed offsite concentrations from a release of methyl mercaptan through the relief valves on the top of this 18,000 gallon methyl mercaptan storage tank due to a fire. The relief valves are located up here – oops, I’m sorry, up here on top inside this yellow circle.

And these vertical sections here are the discharges to the atmosphere. DuPont’s evaluation of these relief valves found that they could release as much as 10,000 pounds per hour of methyl mercaptan if there was a fire under this tank and that, if they did do that, the relief rate was, uh, high enough that it would exceed the ERPG 3 values for methyl mercaptan. If you recall from Tamara’s presentation, ERPG 2 was the point where irreversible health effects began after one hour. ERPG 3 is where the concentration is high enough that life-threatening effects are expected after one hour.

And while the ERPG 2 limit is 25 parts per million, ERPG 3 for methyl mercaptan is 100 parts per million. To mitigate this risk to the public, DuPont invested over $17,000.00 to insulate this tank with fire proof insulation. Proper fire proof insulation will slow the rate at which heat enters a tank due to a fire. And, as a result, the relief rate will be smaller. DuPont’s analysis found that the addition of fire proof insulation could reduce the relief rate from these two relief valves from 10,000 pounds per hour to 4,500 pounds per hour, which would avoid ERPG 3 concentrations in offsite as an exposure to the public.

However, as you can see from this photograph, the tank is not insulated. The insulation intended to protect the community from ERPG 3 concentrations of methyl mercaptan was removed. So since that time, workers and the public have been exposed to unacceptable risks. The CSB has been unable to determine when the insulation was removed. DuPont lacks documentation, for example, management of change. And the change is not documented in the process hazards analysis associated with this tank. Also, current DuPont personnel were unaware of the tank ever being insulated for the purpose of limiting toxic gas exposure to the public.

The second example of an unsafe relief system involves two relief valves located on a nitrogen supply system in the IBU. These two

30015_DuPont Public Meeting (9-30-2015) Chair Sutherland, Member Ehrlich, Member Engler, Member Kulinowski, Donald Holmstrom, Dan Tillema, Tamara Qureshi, Steve Cutchen, Kara Wenzel

www.gmrtranscription.com

16 relief valves could open if controls that regulate the nitrogen system pressure were to malfunction. In the photograph, you can see the discharges of the relief valves are directed to the underside of a rack containing piping and other process equipment. So that’s – that’s these two arrows. Here’s the relief valve, the little gray relief valve. And you can see the arrow from this other one as well directed up at the underside of this piping. Also, if you look in the back, you can see this ramp and doorway.

This is an access point into the building for workers. If those relief valves open, nitrogen will deflect off of that piping and be directed toward the ramp in that opening. This is an asphyxiation hazard. DuPont’s standard specifically prohibit both of these scenarios. Relief systems are not to be designed to impinge on piping. And relief systems are not to be designed so that they’re directed toward platforms or other areas used by workers. The third example involves a relief system that activated while we were on site doing our investigation in December—on December 16 of last year.

Highly toxic chlorine was released from a relief valve on a caustic scrubber located within this – the relief valve was located within this yellow oval that you see in the photograph. Now, it’s hard to see the actual valve because there’s so much congestion with the piping. Where this is located is on the outside of the manufacturing building. And there are portions of the building on three sides. The detector – the chlorine detector that actually detected the – the relief valve going off is located on the other side of the structure that you see in this photograph.

Recall from the previous example that DuPont’s standards specifically prohibit relief systems that are directed toward platforms or areas used by workers. For this relief system, DuPont actually evaluated this. And they concluded that the location was safe because the platform associated with the valve was located 10 feet below the valve. But if you look at the photograph, there are platforms also located above that valve. Finally, like the storage tank example, this example includes a relief system that was on the equipment that was associated with the November incident.

The relief valve shown here is on the discharge piping of the Lannate® feed pump that feeds methyl mercaptan from the storage tank into the manufacturing building. This is the feed pump that

30015_DuPont Public Meeting (9-30-2015) Chair Sutherland, Member Ehrlich, Member Engler, Member Kulinowski, Donald Holmstrom, Dan Tillema, Tamara Qureshi, Steve Cutchen, Kara Wenzel

www.gmrtranscription.com

17 feeds the feed line that was frozen. Relief valves on this piping are designed – in the circle that you see here, are designed to discharge liquid methyl mercaptan to the ground adjacent to where workers were stand – would be standing if they were starting that pump. Now, there are actually two pumps. And they’re virtually identical. The other pump also supplies methyl mercaptan, but it’s to another process called API.

The API pump also used to have relief valves just like this one here on the Lannate® pump. But they were removed in the 1990’s. No process hazard analysis or relief system analysis documents these Lannate® valves and answers why they are not still present. And key DuPont technical personnel were unaware that these valves existed. The CSB is making recommendations to DuPont to ensure that all IBU pressure relief systems are routed to a safe location prior to resuming IBU manufacturing. And we’re also recommending that DuPont commission a pressure relief device analysis consistent with standards and codes.

And that implementation of the results of that analysis must specifically result in all pressure relief discharges being routed to safe locations. And as we’ve been saying, the details of our recommendations this evening are found in our document. Next, I’m going to talk about Process Hazards Analysis. Process Hazards Analysis, or PHA, come in many forms. For example, if there’s a new capital project that’s being implemented, a series of PHAs are typically performed at various stages: design, construction, and pre-commissioning. OSHA’s Process Safety Management Regulation requires periodic PHA’s be conducted for existing processes.

A PHA is also included as part of the OSHA-mandated Management Of Change process that discovers – that – that covers any modifications that you make to a given process. I’m going to describe two areas associated with the incident where the CSB investigation has revealed deficiencies in the PHA process at the DuPont La Porte facility. The first example has to do with the manufacturing building ventilation system, which Tamara described earlier. The left photograph here shows the dry end and the wet end fans located on the roof of the manufacturing building on the fifth level.

30015_DuPont Public Meeting (9-30-2015) Chair Sutherland, Member Ehrlich, Member Engler, Member Kulinowski, Donald Holmstrom, Dan Tillema, Tamara Qureshi, Steve Cutchen, Kara Wenzel

www.gmrtranscription.com

18

On the right at the bottom are the louvers that she described through which fresh air is drawn in. And the photo at the top is the ductwork, which routes the exhaust air to the outside collection duct and up to the fan located on the roof. The ventilation system for the manufacturing building, a process safety-critical system described as designed to control contaminants to an acceptable work place exposure level, has never been evaluated by a Pprocess Hazards Analysis. The DuPont PHA schedule indicates that the initial PHA for the manufacturing building ventilation system will not occur until 2017.

The second example that I’m going – that I’m showing involves the valves that were described in the video of the incident. These are the valves that connected the liquid methyl mercaptan feed system to the vapor waste gas vent header at each of the two railcar spots. One of these five valves that was open at each railcar spot to create this pathway was installed as part of a project to build a new incinerator for the insecticide business unit. The design change for this new incinerator re-routed the railcar vents from an old existing incinerator. And instead, the vents were routed through the manufacturing building into this new incinerator.

The project PHA did not identify this new connection or the routing of this methyl mercaptan vent from the railcars going through the manufacturing building as potentially causing a hazardous event. And on the evening of the incident, the plan for using hot water on the outside of the methyl mercaptan piping to melt the hydrate—that plan was developed by DuPont technical and operations staff on the morning of Friday, November 14. This plan included using this new railcar unloading spot valve to purposefully connect the liquid methyl mercaptan feed line that they were trying to thaw to the vapor waste gas vent header. No written plans or instructions were developed.

No PHA was used to evaluate the potential hazards of this plan. In the photograph, the white valve on the far right, so that’s this valve right here, is the valve that – that – the new valve with the new connection through which the liquid methyl mercaptan flowed in order to reach the third floor of the manufacturing building. This photograph was taken by DuPont three days after the incident in order to document the position of the valves as found. It’s a little hard to see, I think, on this big screen, especially if I change the slide. But, so, this is the hand wheel of this valve. And there’s a

30015_DuPont Public Meeting (9-30-2015) Chair Sutherland, Member Ehrlich, Member Engler, Member Kulinowski, Donald Holmstrom, Dan Tillema, Tamara Qureshi, Steve Cutchen, Kara Wenzel

www.gmrtranscription.com

19 stem sticking out here pretty far, which is an indication on a valve like this that this valve is open.

DuPont determined the valve was fully open at the time of the incident. I mentioned earlier that OSHA’s Process Safety Management Regulation requires periodic PHA’s be conducted for existing processes. Well, there are two types of periodic PHA’s. Baseline PHA’s are conducted from a clean sheet of paper. They amount to a fresh look at a – the process safety of a particular unit. Revalidation PHA’s, on the other hand, start with an existing PHA and check for required updates. DuPont had divided – has divided their insecticide business unit into 15 different areas for conducting these OSHA-required periodic PHA’s.

And DuPont decided to, prior to start-up, to conduct two new baseline PHA’s for two of the areas out of these 15. Now, there are several methods for conducting a PHA that are approved and actually listed within OSHA’s regulation. At the 2012 Global Congress on Process Safety, which is hosted by the American Institute of Chemical Engineers, a DuPont corporate PHA expert presented a new, robust PHA method, which combined advantages of several existing methods. DuPont decided to implement this new method for these two new, baseline PHA’s.

Many new potential hazardous events were identified, and hundreds of new corrective actions have been developed using this new method. DuPont has since agreed to implement an expedited schedule for the remaining IBU PHA’s applying this new methodology and prioritizing high hazard processes. So the CSB is making recommendations to DuPont to formalize this agreement. Develop and implement an expedited schedule to perform more robust PHA’s consistent with the previous recommendations of systems that we’ve identified this evening for all of the IBU units, and prioritize that schedule based on anticipated risks to the public and workers, in order to ensure that the highest risk areas receive priority consideration.

And, again, the specific language is found in our document. Our next topic is the importance of active work force participation. Throughout our investigative work, the CSB has identified that workers and their representatives play a very important role in major accident prevention. The Center for Chemical Process Safety is an organization of the American Institute of Chemical

30015_DuPont Public Meeting (9-30-2015) Chair Sutherland, Member Ehrlich, Member Engler, Member Kulinowski, Donald Holmstrom, Dan Tillema, Tamara Qureshi, Steve Cutchen, Kara Wenzel

www.gmrtranscription.com

20 Engineers, and they endorse this importance of worker involvement and participation with strong language in the book Guidelines for Risk Based Process Safety. Now, I’m going to read their quote verbatim.

“Workers are potentially the most knowledgeable people with respect to day to day details of operating and process and maintaining equipment and facilities, and they may be the sole source for some types of knowledge gained through their unique experiences. Work force involvement provides management with a mechanism for tapping in to this valuable expertise.”

With these benefits in mind, the CSB is making recommendations to DuPont, to the International Chemical Workers’ Union Council of the United Food and Commercial Workers, and Local 900 C, to work together to develop and implement a plan for effective participation of the work force and their representatives in the implementation of the CSB recommendations regarding the issues we’ve talked about this evening: inherently safer design review; ensuring worker safety in the manufacturing building; ensuring a relief system design that is safe for workers and the public; and the performance of more robust Process Hazards Analysis.

In addition, the CSB recommends that DuPont provide a copy of their integrated plan for restarting the La Porte processes to the workers and their local union representatives. And, again, the specific language is in our document. Finally, we discuss the importance of public transparency and accountability. In our Chevron Richmond Refinery investigation, the CSB identified that transparency between the industry and the public improves health and safety for both the facility and also for the community.

So, with these benefits in mind, the CSB is making recommendations to DuPont to make publicly available a summary of the DuPont November 15, 2014, incident investigation report and a summary of the actions to be taken to implement those same four items that I just listed: inherently safer design review; ensuring worker safety in the manufacturing building; ensuring a relief system design safe for workers in the public; and the performance of a more robust Process Hazards Analysis. And I know you’re getting tired of it, but the specific recommendation language is in our document.

30015_DuPont Public Meeting (9-30-2015) Chair Sutherland, Member Ehrlich, Member Engler, Member Kulinowski, Donald Holmstrom, Dan Tillema, Tamara Qureshi, Steve Cutchen, Kara Wenzel

www.gmrtranscription.com

21

As we described at the beginning, the recommendations presented today are interim recommendations that the investigation team considered potentially critical prerequisites to a re-start of this unit. We interrupted our investigation to develop these recommendations for Board consideration. And with this work completed, the investigation team will now shift back to putting its full attention on the investigation of the November 15 incident. Our focus will include the following potential investigative pathways.

There are circumstances that existed at DuPont, which may have created pre-conditions to the incident in the areas of safety culture, normalization of deviance, and equipment design. There are also systems that we were investigating, which are intended to create awareness of hazards and risk, such as Process Hazards Analyses and Management Of Change systems. There are potential pathways centered on the organizational techniques and practices that were – are used for trouble-shooting operational issues such as the blockage of this methyl mercaptan feed line. These include areas of leadership, communication, and the development of procedures for ad hoc, or one-off non-routine activities.

We will also continue to investigate the emergency responses that occurred after the release and will continue evaluating guidance for industry sources, for example, in the areas of equipment design, PHA requirements, and the safety of ad hoc procedures. And, finally, we will continue to investigate whether there are potential improvements to existing regulatory requirements, which would be effective in preventing a recurrence of an incident like this. So this concludes our presentation, and we’re now prepared to proceed with the agenda for this evening, beginning with questions from the Board.

Chair Sutherland: First, thank you to the investigative team, uh, for a very detailed presentation. And before we take public comment, we will take questions from the Board. The Board will, uh – or any Board Member that has a question will indicate so by slightly raising their hand. I will ask the first question of the investigation team. We have listened to – I have personally listened to - union members, DuPont management, um, and even received a call directly from, um, a VP and the CEO of DuPont, to talk about their commitment. But Mr. Tillema, you mentioned that they are starting work, or beginning work, on some of the recommendations.

30015_DuPont Public Meeting (9-30-2015) Chair Sutherland, Member Ehrlich, Member Engler, Member Kulinowski, Donald Holmstrom, Dan Tillema, Tamara Qureshi, Steve Cutchen, Kara Wenzel

www.gmrtranscription.com

22

Can you provide a little bit more detail about, um, their progress and – and how many resources you could glean? They’ve committed to it, even though they’ve orally committed that they’re beginning to look at the draft recommendations and commence work based on what we have identified.

Dan Tillema: So, to discuss how much DuPont has done already? Okay. Um, you know, when we – we started first developing these interim recommendations back in early June – June – June 11, at which point in time, DuPont was not willing to do the recommendations we’re presenting here tonight. After we got that first draft, um, completed (that was around June 23), we were able to provide a copy of that to DuPont for our factual and CBI process for quality control that we have.

And, uh, after DuPont received that document, about a week later, they had changed their position on the recommendations, and had verbally or orally agreed to adopt the recommendations and get them implemented. Since then, you know, we’ve had several conversations with them about their – their progress on those. There’s, you know – it’s a big scope of work. And DuPont will tell you that, you know, they do not have a re-start date at this point in time. They’ve – they’ve postponed what we believed was the August start-up.

Um, and they’ve been working still on developing a more comprehensive re-start plan, which is what we’ve asked them to share a summary of with the public, share the more full details with the union workers at the site and ourselves. Um, but the – the details of that re-start plan are – are still being developed. And I don’t think there’s a start-up date even as of yet.

Chair Sutherland: But would you expect the re-start plan to include, or progress reports to include, significant progress on all of the draft interim recommendations before you would consider the facility safe to re- start?

Dan Tillema: I think so, yes. I mean, definitely, like with the relief valves, we – we’ve been told there’s a lot of work going on with relief valves to make sure those systems are going to be safe before they restart. Some of the PHA’s will even be completed. The new baseline PHA’s with the more robust methodology, um, will be completed

30015_DuPont Public Meeting (9-30-2015) Chair Sutherland, Member Ehrlich, Member Engler, Member Kulinowski, Donald Holmstrom, Dan Tillema, Tamara Qureshi, Steve Cutchen, Kara Wenzel

www.gmrtranscription.com

23 before we start. Um, they’re committing to an expedited schedule rather than the five-year regulatory review. Uh, what we’ve been told thus far is that it will be more like a three year schedule for the relief valves.

The inherently safer design reviews are taking place, and they’ve committed to looking at everything, um – I – I – I won’t go into the specific details of some of the things they’re looking at because I don’t want like to commit them to things that might not wind up happening. But what we’ve been told is they are taking these very seriously. And they are looking at the inherently safer design options very seriously.

Chair Sutherland: My last question before I recognize, uh, individual Board Members is, Ms. Qureshi, you mentioned that, um, the containment facility did not have any destruction device. Can you explain, uh, to us whether it is equally safe if they had had a – a containment building with some appropriate destruction device or routing system versus a more open structure? Are those equally safe, or should they be looking at one versus the other?

Tamara Qureshi: That is actually part of what, um, DuPont is actually doing. They’re actually investing money in getting resources so that they can evaluate what would be an appropriate structure for that particular building. So they are going to be the ones who have all of the analysis and the data to determine: whether or not would it be safer to have walls or what parts of the area would have walls; what type of ventilation system would be appropriate; um, or to actually just take all of the walls off. That is all part of what DuPont will be doing, and part of their analysis.

Chair Sutherland: Thank you.

Dan Tillema: Might I just add to that that, you know, looking at the containment building and open structure versus closed is really a risk tradeoff that DuPont has to look at and make a decision on. There’s an increased work – increased risk to the workers with the containment building type design. There’s a risk reduction to the public. And it’s really a corporate level decision on what their ultimate preference is going to be.

Chair Sutherland: Thank you. I saw a hand from Member Ehrlich.

30015_DuPont Public Meeting (9-30-2015) Chair Sutherland, Member Ehrlich, Member Engler, Member Kulinowski, Donald Holmstrom, Dan Tillema, Tamara Qureshi, Steve Cutchen, Kara Wenzel

www.gmrtranscription.com

24 Member Ehrlich: First of all, I want to thank you for the commitment you made to this and an excellent presentation. Thank you all very much. I’m always interested in the emergency response aspects of these things. Uh, you stated that you’re going to look at all of the emergency response incidents that have occurred. But beyond that, are you going to look at all of the requirements, uh, that are set forth by OSHA and other regulatory agencies for implementing, equipping, training, and exercising, an, um, adequate emergency response function?

Dan Tillema: Um, uh, short answer will be yes. I mean, the longer answer is DuPont is actually doing a lot of that. I mean, since the incident happened, um, ultimately, the emergency response itself we don’t see as causal to the incident in any way. However, they saw a lot of shortcomings in their emergency response programs. And they’ve – they’ve gone back and reassessed that entire program. And a lot of that work is still pending. So it’s not fully complete yet.

Member Ehrlich: Okay. And I have one more question.

Steve Cutchen: I’ll – I’ll add to that just briefly. I mean, one of the things that we’ve come to realize is one of the – the – the supervisor who perished in this incident, Wade Baker, was – had a very, uh, important role with respect to emergency response on that – on night shift like he was on. And when he went down as part of this incident, that created a – a pretty big gap in how they could respond and how to fill that gap in a situation like that is something that we need to look into. Uh, another area is that there are multiple companies associated. All that used – this – this used to be one big, DuPont facility.

And now, there are several companies associated with bits and pieces of this what formerly was one big site. And they all work together to effectively put their emergency response teams as one. That process is still difficult though because you’re looking at trying to coordinate that across different companies. And we’ll be looking into some of the effectiveness of how that works.

Member Ehrlich: Thank you. Well, on top of that, um, not only different companies but different product lines and different training requirements for the responders as well. Um, emergency response on-off shifts is always a problem where you don’t have a full staff. And it just requires an absolute commitment to some type of public group or

30015_DuPont Public Meeting (9-30-2015) Chair Sutherland, Member Ehrlich, Member Engler, Member Kulinowski, Donald Holmstrom, Dan Tillema, Tamara Qureshi, Steve Cutchen, Kara Wenzel

www.gmrtranscription.com

25 public service group or, uh, just people that are available for emergency response training 24/7. I have one more question. You commented that, I think it was you, Steve, that the, um – or maybe it was Tammy, the – the, uh, ventilation system PHA was supposed to have been done and has been postponed until 2017, is that right?

Steve Cutchen: I think it’s – what’s happened is it hasn’t been part of a PHA. And the first scheduled PHA for the ventilation system was scheduled for 2017.

Member Ehrlich: Okay. But that’s going to be expedited, I assume, right?

Steve Cutchen: We would expect so, certainly, yeah.

Member Ehrlich: Okay. Thank you. Thank you, Chair.

Chair Sutherland: Thank you, Member Ehrlich. Member Kulinowski?

Member Kulinowski: I’d like to ask a question about Personal Protective Equipment and its role in this tragedy. Did you find any evidence that there were safety protocols for the use of Ppersonal Protective Equipment, particularly a respiratory protection, uh, for these workers when they were conducting such non-routine operations as – well, non- routine that became routine - of opening this valve to relieve the pressure?

Dan Tillema: So, I mean, DuPont has a great many policies and procedures. There are policies and procedures that, if you read them, they will imply to you that Personal Protective Equipment, like respiratory protection, should have been worn for that job. However, at the same time, the daily instructions that operators were following to go out there and drain that line, um, did not specify any additional, um, Personal Protective Equipment or respiratory equipment and the practice that developed over time was not to use it. Um, I don’t know, do you guys have anything else that you would add to that?

Steve Cutchen: I think, I mean, the material that they were normally draining was something that was pretty smelly. But I don’t know that they felt like that there was a particular hazard associated with it. What happened in this situation was that you – you had methyl mercaptan almost – well, essentially pure methyl mercaptan on the other side of that valve when it was opened and not the normal liquid that they were used to having collect in that vent header.

30015_DuPont Public Meeting (9-30-2015) Chair Sutherland, Member Ehrlich, Member Engler, Member Kulinowski, Donald Holmstrom, Dan Tillema, Tamara Qureshi, Steve Cutchen, Kara Wenzel

www.gmrtranscription.com

26 And so it – you know, it’s a situation where maybe the normal response is – or the response that’s been normalized based on what your initial instructions were is to not use respiratory protection because you just don’t see a need for it.

But then there’s alternate scenarios that maybe everybody hasn’t thought about and hasn’t come up in a PHA, uh, that, as a result, can catch you by surprise.

Member Kulinowski: And it is your conclusion that these – if these PHA’s had been done, this – the potential for this hazard could have been identified?

Steve Cutchen: I believe that – that – that this was, essentially, a line break on these lines when these lines were drained. And as such, uh, DuPont should have been requiring, uh, that they be wearing full respiratory protection, yeah.

Dan Tillema: But going back even further with the PHA, I mean, liquid in a vapor vent header system is something DuPont has dealt with in two other applications on the same vent header in other applications that have a drain line hard-piped to other process equipment, so it would not have to be released to atmosphere at all. Um, and – and I think a PHA would be reasonably expected to catch something like that and to offer corrective actions.

Member Kulinowski: Thank you.

Chair Sutherland: As a related or follow-up question to Member Kulinowski, how would the methyl mercaptan – uh, methyl mercaptan detectors, um, sort of work together with this? Because, clearly, they are implementing, or DuPont says they’re going to implement, new alarm detectors. But even if the alarm detectors had been there and – and working - had it been set at an appropriate level, they still wouldn’t have been able to enter. Is there going to be more specificity placed on the detectors setting it at the right level, making sure that people know, even with our equipment, we shouldn’t go in because the amounts or concentrations here are too deadly?

I mean, tell – tell me a little bit more about how the new alarms or detectors might also, um, prevent people from walking in, even if they do have the appropriate PPE.

30015_DuPont Public Meeting (9-30-2015) Chair Sutherland, Member Ehrlich, Member Engler, Member Kulinowski, Donald Holmstrom, Dan Tillema, Tamara Qureshi, Steve Cutchen, Kara Wenzel

www.gmrtranscription.com

27

Dan Tillema: Yeah. So, we still don’t have the full details of how many detectors are going to be installed. Clearly more are going to be installed. We saw some of them on our field review this week, new detectors out there. We saw lights on the outside of the building that appear to be some kind of a pre-warning system that there’s an – an unsafe atmosphere in the building to prevent people from going in there. Um, but we still don’t have the full details of what DuPont’s plans are there. Um, that’s – that’s something we’ll look at as those – as those details are provided to us.

Chair Sutherland: Okay. I heard you. Um, I’ll recognize Member Ehrlich.

Member Ehrlich: Um, was there any indication that they had completed a comprehensive Haz Com, uh, either under the old 1200 standard or Haz Com 212 training, uh, in that unit?

Dan Tillema: Um, gosh, off the top of my head, I don’t remember that. I know there’s – there’s a lot of training that DuPont employees take. I don’t remember the specific Haz Com training. Um, I’m sure we’ve seen training records for that, I just don’t remember.

Member Ehrlich: Okay. And I guess one other question I had was, are they going to use or implement a procedure where they use four gas monitors when they go into these areas aside and apart from the fixed sensors?

Dan Tillema: And I think – I think a lot of that is – is still not fully known to us. I mean, you know, we haven’t talked about it, but, you know, there’s even the explosion potential during the incident.

Member Ehrlich: Right.

Dan Tillema: That’s all stuff that we’re still continuing to evaluate and understand how they intend to address that in the future because at – at one point, you know, you’re worried about the atmospheric from an inhalation toxicity. From another point, you don’t want anyone going in there because it’s, you know, an explosive atmosphere in there. And that has to be considered, as well. Again, those are details of what we’ll be looking at as we go forward. But we just don’t have sufficient information.

Member Ehrlich: Thank you.

30015_DuPont Public Meeting (9-30-2015) Chair Sutherland, Member Ehrlich, Member Engler, Member Kulinowski, Donald Holmstrom, Dan Tillema, Tamara Qureshi, Steve Cutchen, Kara Wenzel

www.gmrtranscription.com

28

Chair Sutherland: Member Engler, do you have any questions?

Member Engler: Thank you. I have a quick comment and one question. Over two months ago, the International Chemical Workers’ Union Council and the United Steel Workers, which represent DuPont, workers across the nation wrote to the CEO of DuPont, Ellen Coleman, asking her to start a dialogue about how to better protect safety and health in the environment with the two unions. But to date, she has not agreed. I encourage DuPont to reconsider its position and engage in such a national dialogue, which can only help implement the CSB’s recommendations at La Porte, particularly if there are issues with limited resources to conduct PHA’s in a timely fashion.

Uh, my question is, and it speaks to the larger question of safety culture, is that I understand that a DuPont La Porte employee with eight years of experience was disciplined in 2013 for allegedly leaving a valve open involving chlorine. Now, we find out from our investigation that La Porte site policies, procedures, and training were fundamentally flawed. Is it appropriate in – in your view to penalize individual workers in these types of situations? In my view, blaming workers creates a climate of fear, which suppress reporting and open discussion of health safety and environmental concerns. I would appreciate your comments on that question.

Dan Tillema: Um, in – in general, um, in that particular incident, if it’s the one I’m – I’m thinking you’re referring to, is – is something we are looking at as part of our investigation. Our focus with that incident is really, since we’ve been at the site, we’ve heard from the workers that DuPont incident investigations do have more of a focus on blame and less of a focus on preventative corrections. Um, that’s something we really want to better understand. It’s one of the areas where we’re hoping the union and DuPont management will better collaborate so that every incident that is investigated by DuPont gets full preventative learnings, um, rather than a focus on blame.

I – I don’t know that I’m in a position yet to state whether that was the case or not because the – the investigation is still something we’re looking at.

Member Engler: Thank you.

30015_DuPont Public Meeting (9-30-2015) Chair Sutherland, Member Ehrlich, Member Engler, Member Kulinowski, Donald Holmstrom, Dan Tillema, Tamara Qureshi, Steve Cutchen, Kara Wenzel

www.gmrtranscription.com

29

Steve Cutchen: You know, I – I think that when you look at what people typically do when they go to work, what people want to do is they want to work for a company that – that performs well. They want to work for a company that treats them right. And when people go to work, they’re typically trying to do a good job. And when the decisions they make are decisions they make because it seems like it’s the right thing to do at the time. So it’s very – it’s almost unprecedented for somebody to – to make some kind of a move or to push the big, red button out of spite or something along those lines. They’re doing it because it seems like the right thing to at the time.

And that’s why, uh, what we try to investigate – Dan mentioned about going into very deep, uh – deeply into what the preconditions and causes are organizationally, uh, for these – for these kinds of incidents because it’s very rare that it’s the actual individual who is just, on a wild hair, decides to – to do something. Usually, it’s because what it seems like the right thing to do at the time. And the question then becomes why – why was that? And so you’re looking at pre-conditions. You’re looking at organizational issues. And – and it’s – that’s why we try to stay so far away from individual blame.

Chair Sutherland: Are there any final questions from the board? Then, at this time, we would like to open the floor for public comment. We have, um, several requests from the signup sheets. And we will read them, uh, off. When you hear your name, I think we have a microphone. Where is – there it is with Shauna. Um, please come to the microphone so that we’ll all be able to hear you, and state your name. We will also, um, uh, because of the – the hour and the number of people who may want to make comments, restrain – uh, restrict everyone to three minutes. I think there is a timer to my immediate right, if you can see it in red. The first public comment, um, will be from Betty LeBlanc.

Betty LeBlanc: Thank you. Uh, I appreciate all of these recommendations and everything I heard and all the hard work that you all had done investigating this. But it seems like you all have repeated the made recommendations before this. And things haven’t been taken care of. So how do we get people or companies to comply with what you all’s recommendations are? How many lives do we have to lose or injuries do we have to suffer because of negligence? And so

30015_DuPont Public Meeting (9-30-2015) Chair Sutherland, Member Ehrlich, Member Engler, Member Kulinowski, Donald Holmstrom, Dan Tillema, Tamara Qureshi, Steve Cutchen, Kara Wenzel

www.gmrtranscription.com

30 many of these things can be highly financially costly, but then some don’t cost hardly anything. They possibly could have saved someone’s life.

Uh, safety equipment, when I first heard about wearing a mask that for 15 minutes, I said what is that? When you’re climbing up on a third level and doing your work and – that’s not very long. But I also watched tonight, and I saw this, not only did we not have responders that could even go in because they had not the proper equipment. Of course they can’t go in if you don’t have the proper equipment. And it took an hour and a half to get somebody there that did have that could get in. But what I see is also, you know, I see these buildings. Who designs them? Who has the blue print for what they’re needed for? Who has the codes for them? And who inspects them?

When I build a house, I have a blue print, an architect I have to bring it to and get a permit. I have codes I have to go by. And then you have engineers and inspectors who inspect these buildings. So it looks like these buildings here wasn’t even designed properly for what is needed for it. So I don’t – I don’t get it. These people are so smart nowadays, and I know they can design a proper building that would be safe and sufficient to manufacture their product. And that’s all I want to say. But I do appreciate you all’s work very much. And I hope we do not have to lose or have another injury because DuPont I always thought, I’m 75, and I never heard anything but great things.

And when my daughter went to work there, I said, “Gee, baby, this has got to be the best thing that could happen. And I know you are happy about it,” because all we ever heard was good things. Never dreamed this would happen. Thank you very much.

Chair Sutherland: Thank you very much for that comment. Next, um, if Michael Alexander would like to still make a comment. If Michael has stepped out, we will call him again at the end. Uh, is Brent Coone available? We will welcome you to the mic.

Brent Coone: Uh, good evening, Madam Chair and, uh, Members of the Board. Uh, I have not had the pleasure of visiting with you guys before. It’s, uh, not the first rodeo for us with, uh – with Don and some of the older statesmen with the CSB. Uh, I’m Brent Coone. I’m a trial attorney here in Houston. Uh, we’re actually in trial now in two

30015_DuPont Public Meeting (9-30-2015) Chair Sutherland, Member Ehrlich, Member Engler, Member Kulinowski, Donald Holmstrom, Dan Tillema, Tamara Qureshi, Steve Cutchen, Kara Wenzel

www.gmrtranscription.com

31 fatality cases involving a boiler explosion, uh, up in Oklahoma. Uh, our firm, and I personally, represented thousands of people in the petrochemical industry throughout the United States.

And unfortunately, I’ve had to attend these types of meetings before, uh, regarding the family members, uh, the – the widows and orphans of corporate negligence just like my client, Betty, and the rest of her family here. Um, we would like to say a few things about the – the investigation and some of the things that have taken place in this case. Uh, I represent the United Steel Workers. Uh, we’re very close friends with the Chemical – uh, Chemical Workers’ Union. They actually share space down in La Porte. Uh, we work regularly with the unions and know very intimately what goes on in these plants.

Uh, what we’re seeing here tonight is the same thing we saw here several years ago when the CSB had to come down and explain the findings associated to the BP Texas City case, which I served as lead counsel. The frustration that people like Betty and these other widows and orphans have is that the blue print of the findings that you have tonight is interim, which, hopefully, this Board will adopt, are not dissimilar to what we have as findings in every other case involving fatalities in the petrochemical industry. We know these companies are sophisticated. We know they’re not ignorant. And we know that the reasons these things happen is because they cut corners.

That’s something that I know, something the Board Members know, certainly something our investigative team knows and probably most of the people in this room know. And it’s up to you guys to make these people do the right thing. And CSB has that responsibility and obligation. And we thank you for the work that you do because you’re one of the few sources of public sentiment that come out and express these findings in a public manner because most of the other ones, unfortunately, get swept under the rug. Uh, this industry has historically failed to self-monitor, which they’re allowed to do by OSHA.

The things that we see here are the things that we see time and time again with these types of incidents in our petrochemical industry. These plants are getting older. There’s increased pressure on the bottom line at these plants to do more with less. Less employees, less safety culture, less training. They also do this with less

30015_DuPont Public Meeting (9-30-2015) Chair Sutherland, Member Ehrlich, Member Engler, Member Kulinowski, Donald Holmstrom, Dan Tillema, Tamara Qureshi, Steve Cutchen, Kara Wenzel

www.gmrtranscription.com

32 reinvestment in their units. Units were postponed for reinvestment for turn arounds and shut downs for many years now. And they’re operating on a patchwork system of what they call Band Aiding with clamps. And that’s the way these units all run now because management doesn’t want to shut them down and take the losses associated with a shut-down and the cost associated with repairs.

That happened here. It happened in Texas City. It happened in almost every case I’ve worked with the CSB on and the many hundreds of cases I’ve worked on that the CSB was not involved in. So with that, we would like to recommend a few things. We would ask of you guys, as a Board, adopt all of these findings. We want to thank the CSB and their investigators for the Victims’ Assistance Program and educational program, which is something newer, which my clients have derived a lot of benefit from and the other victims have gained benefit from. We would like you guys to have a broader mandate so that you can investigate all of these fatalities.

I have two fatalities in trial now that the CSB didn’t have the resources to investigate. So we had to do all of that on our own, which we are happy to do. But we love to have the collaboration and cooperation of CSB. And last, we need you guys to, somehow, get a broader mandate from Congress to do the other thing that makes a difference. And that thing that makes a difference is criminal accountability. When these management people make these decisions over and over again with impunity to the legal system other than paying some fine, which is usually trivial, and other than some penalty from somewhere else and taking a slap in the face from the CSB, they all walk home.

And these workers don’t walk home when they’re killed. And if they did the same thing to someone else, they’d go to jail. And we’ve only been successful in doing that one time, and it was Texas City, uh, one that Don was involved in. And we got the DOJ involved. And, at least, we got a criminal indictment and a plea of 15 counts of felony manslaughter. But even then, not one person went to jail.

And you guys need to work with Congress to expand the criminal accountability because, unless management that makes these decisions that are all based on bottom line monetary issues, and

30015_DuPont Public Meeting (9-30-2015) Chair Sutherland, Member Ehrlich, Member Engler, Member Kulinowski, Donald Holmstrom, Dan Tillema, Tamara Qureshi, Steve Cutchen, Kara Wenzel

www.gmrtranscription.com

33 there’s no accountability for that, nothing is ever going to substantively change. So with that, thank you.

Chair Sutherland: Thank you, Mr. Coone. Is Larry Wilson available to come to the mic? Thank you, Mr. Wilson.

Larry Wilson: Thank you, uh, Madam Chair, and your fellow Board Members, thank you all as well, and especially investigative team. I appreciate you all. And if I might, uh, single out, uh, Dan Tillema, uh, for all of his courtesies, uh, through the many months at, uh, helping to educate us and keeping us apprised of everything. Uh, there are three reasons I want to encourage the Board, if you would, to adopt, uh, the recommendations that have been made tonight. First, uh, the – the magnitude of the – of the event. Uh, the one thing I might change the language on just a little bit is I don’t think this is three, uh, DuPont death events.

It’s really six, uh, DuPont death events. And – and to me, these last four are just, uh, incredible, uh, in – in – in their nature. Uh, we have a man who opens a valve, and a completely unexpected, unintended thing comes out of this, a deadly gas comes out. He dies. A lady who sees that dies. There are now two dead people in the plant, and nobody knows it. Nobody knows it. Here is – here is DuPont with all of its resources, its incredible safety system. There’s not a signal that goes out that two people are dead. There’s not a signal that goes out to warn people that, uh, here is why they are dead.

We’ve had a massive release. Nothing is going – being communicated. And – and as a result of that, we have others, my, uh – my clients, uh, Robert Tisnado’s family. Uh, Robert Tisnado goes in there trying to help out with no idea at all that there’s a massive gas leak, with no idea at all that there are people who have died due to that leak. And so for the first – uh, the – the first reason, I would say is that you ought to, uh, adopt this is because of what seems to be systematic failures or systemic failures here.

The second reason I think you should adopt it is, it is shocking to think that DuPont, after these four deaths, was ready to do this start-up and ignore the earlier, informal recommendations of the investigative committee. Incredible. I – I tell you one of the reasons you ought to adopt them is these interim recommendations are the reason that DuPont is now making at least some of the

30015_DuPont Public Meeting (9-30-2015) Chair Sutherland, Member Ehrlich, Member Engler, Member Kulinowski, Donald Holmstrom, Dan Tillema, Tamara Qureshi, Steve Cutchen, Kara Wenzel

www.gmrtranscription.com

34 changes that were talked about. But for the interim recommendations, DuPont would have already started its plant. It would have already started its plant. The only benefit to restarting its plant right now, the only benefit, is profits.

That’s it. And – and it was going to be at the risk of the lives of other workers. And – and the final reason that I would encourage you to adopt these, ultimately, as an attorney representing, uh, the family members of one of the Tisnado family members, um, we have very little that we can do. We are strictly limited by the Texas legislature that has limited the amount that can be recovered in civil lawsuits. And that means largely. If there’s going to be change by DuPont, it rests with you all. And – and I hope that you realize that. Uh, the other thing I would say is, and I would encourage you to do this, um, at – at least consider this in terms of a long-term solution.

We talk about monitoring the gas, but I haven’t heard any description or discussion of possibly personal monitoring. I – I wonder if in this day of Apple watches and things like that if there isn’t an ability to have personal monitoring so that when people go into a system where there is no ventilation, where we’ve got a critical, uh, problem that exists from – from things like that, if there’s an ability for personal monitoring that could signal when people aren’t breathing or when people’s heartbeat has stopped. I also wonder if there could be external personal monitoring where you could have cameras set up at – at locales.

I mean, there was literally no way for anybody to know that there were people dead on the floor because of a massive leak here. No way for anybody to know. And I wonder if that isn’t another solution. Thank you.

Chair Sutherland: Thank you, Mr. Wilson. Is Robin Pitblado? Welcome.

Robin Pitlotto: Yeah, okay. That’s good. Uh, yeah, my name is Robin Pitblado. I’m a senior vice president at DNVGL, which is one of the world’s largest safety companies. Uh, and I’ve worked on a number of, uh, major accident investigations as – as well. Uh, obviously, DuPont’s coming under some criticism tonight. But I do want to say as a preamble, uh, I did have an opportunity to tour, uh, a DuPont facility for chlorine in – in Northern Ireland and – and, uh, they had some excellent systems for building safety culture, which

30015_DuPont Public Meeting (9-30-2015) Chair Sutherland, Member Ehrlich, Member Engler, Member Kulinowski, Donald Holmstrom, Dan Tillema, Tamara Qureshi, Steve Cutchen, Kara Wenzel

www.gmrtranscription.com

35 I wish, uh, most companies here in the US would adopt. So I think, uh, DuPont is not all bad at what they do.

Uh, but I did want to say, um, one thing that we’ve noted, uh, is that the – the industry as a whole is much better at occupational safety than it is at process safety. And this was seen in Texas City, which, uh, I know the CSB also commented on, as well as the Baker panel. Uh, and I think what that says is the current PSM program, uh, is insufficient. Uh, and – and just doing more of the same, which is one of your recommendations, more PHA. Uh, we don’t think that’s good enough.

Uh, we have issued a – a document here, a public document, uh, for six things, which the process industry, particularly the offshore industry where we work more, might do that would improve process safety by the same factor of 10 improvement that, uh, occupational safety has improved in the last 20 years. And – and – and the one specific thing here, which I think applies to this accident, is, uh, uh, a focus on safety barriers. Uh, what we saw here in your description is multiple safety barriers that weren’t recognized as proper safety barriers, weren’t treated as – as special items requiring due attention and knowledge of their current status, uh, and – and that is a growing, uh, technique, uh, here and – and – and abroad.

Uh, I specifically have – have participated in a major accident investigation of nine fatalities earlier this year where the ventilation system was a critical part. It was an enclosed space, and here we have an enclosed space as well. Uh, and – and so, basically, what I would say is that, uh, uh, a focus on safety barriers, uh, which leads to identification of safety critical elements for which you can then establish performance standards and then monitor those safety barriers on a continuing basis looks like the most productive extension to the current PSM regulations. And I encourage you to, uh, make a recommendation of that type.

A – a general recommendation. You’ve made some very good specific recommendations. But I think this calls out for a general one. And – and, in fact, I think it matches your recommendations in Volume 2 of the Macondo report, uh, that there should be a greater focus on, uh, safety critical barriers. And I think that would have been a big help in this incident. Okay.

30015_DuPont Public Meeting (9-30-2015) Chair Sutherland, Member Ehrlich, Member Engler, Member Kulinowski, Donald Holmstrom, Dan Tillema, Tamara Qureshi, Steve Cutchen, Kara Wenzel

www.gmrtranscription.com

36 Chair Sutherland: Thank you. Is Bob Simmel, Simmel, Simmel. And we will welcome you to the microphone.

Bob Simmel: Hi, my name is Bob Simmel. Uh, I have 37 years of experience in, uh, research, design, start up, construction, and over-pressure protection of chemical plants and refineries, 29 years in release system design. I worked on several of the flares at BP Texas City after the isom explosion. Um, there’s some discussion about toxics and release systems going to closed systems I desperately need guidance on, because the – the – the criteria here on some atmospheric relief valves about 10 feet above the nearest, unoccupied platform is relatively common. I completely agree that you do not have a liquid, um, mercaptan relief valve discharging to grade when you can go into the tank that’s next to it.

So some of those things are, unfortunately, very poor practice in – in – in those things. But there are relief valves that discharge to the atmosphere. We do need guidance. We do a lot of dispersion analysis to make sure clouds or plumes do not affect the public, do not affect workers. We need to know if that is satisfactory or not. Uh, that’s – that’s – that’s a big one for me. Um, I am familiar with inherently safe design. Uh, my first exposure for that was some 30 years ago with [inaudible] [01:58:07]. Um, I know there are many papers that are presented on that. Uh, I, frankly, don’t know if that is out as an API standard.

But I would recommend that you suggest that API develop that because that’s something that we could all use. Um, technical issues. The, uh – the – the comment about the relief systems were capable of 10,000 to 12,000 pounds an hour and the fire rated insulation could get to 4,000. If you go to API 521, it may actually be 400 pounds an hour. It could have – it – it could have been down that far, which would have been an extremely low amount and been very good dispersion probably. Uh, the – the other issue there is, I can’t tell from the pictures, but those relief valves may not be adequately supported. Thank you very much.

Chair Sutherland: Thank you, Mr. Simmel. I would like to re-invite Michael Alexander if he has returned to the room. And if not, uh, we would now open the floor to anyone who would like to also make a comment. As Mr. Morawetz makes his way – his way to the microphone, if anyone else has a comment that they’d like to

30015_DuPont Public Meeting (9-30-2015) Chair Sutherland, Member Ehrlich, Member Engler, Member Kulinowski, Donald Holmstrom, Dan Tillema, Tamara Qureshi, Steve Cutchen, Kara Wenzel

www.gmrtranscription.com

37 make, you can just queue behind, uh, the speaker immediately in front of you.

Mr. Morowitz: Uh, my name is John Morawetz. I’m with the Health and Safety Department of the International Chemical Workers’ Union. It represents the workers at this facility. And also, I should say three other companies that are spinoffs of DuPont at this physical facility. Uh, first of all, my condolences to the family, friends of the deceased. Uh, it’s a loss, uh, in these circumstances. I can’t even imagine. Um, Chairperson Sutherland, Board Members, and the staff both here and for your small agency in Washington D.C. and the Denver office, I think that it – you’ve done an excellent job on interim recommendations.

I think it’s a huge step forward. Thank you very much for it. And I urge their adoption. Uh, it’s important to also know it’s just a first step. I think, as the Board Members have said, there will be a final report. You have to decide what that will include. And, uh, I look forward to seeing that. In particular, the final reports traditionally have included root cause analysis. The bottom line as to how to prevent this from taking place, which is, obviously, as you’ve seen, everybody has seen, a very complex situation. Uh, it includes recommendations. And recommendations that can – traditionally, have been very broad.

Recommendations not just for methyl mercaptan, not just for the La Porte facility, not just for DuPont. But how are highly hazardous chemicals handled, and how can we move steps forward so these kinds of incidents don’t happen again? Um, I – in particular, one of your recommendations – we were very happy and pleased to see Recommendation 5, and we’re working with the local union, the members, as well as international staff. I think that’s important. And we hope that DuPont will follow that in working together on a – a range of health and safety issues.

In terms of four particular areas I’d hope that you would include in your final report, one is the Process Safety Management Standard, that’s been alluded to in the report, sufficient to prevent similar incidents. Was it just lapses and failure to implement that standard? Or does the standard need to be improved upon? We know it’s difficult for OSHA to improve a standard, to change it. But at least getting it on the books and making recommendations, uh, to a range of organizations, not just OSHA, but to many other

30015_DuPont Public Meeting (9-30-2015) Chair Sutherland, Member Ehrlich, Member Engler, Member Kulinowski, Donald Holmstrom, Dan Tillema, Tamara Qureshi, Steve Cutchen, Kara Wenzel

www.gmrtranscription.com

38 voluntary organizations, the ANSI standards can be an important step forward.

Uh, Two is: did the hourly and salary personnel know how rapidly fatal methyl mercaptan could be? Those that work for us know now how dangerous all of the chemicals can be as, uh, Board Member Ehrlich had mentioned. Uh, further, uh, La Porte facility right now, I believe, uses computer-based training. Is that really efficient and effective for the work force? And in particular, also, does the management learn how effective that kind of training can be when it’s just computer-based, uh, not just signing off on a record? Three, does the work force know when to use escape packs or SCBA’s, especially when there are hundreds of alarms going off?

A very difficult situation—people want to respond rapidly. Uh, do they know what to do? And lastly, what procedures should be in place to respond to alarms, to calls for assistance, not just what’s in writing, but are there drills, are there practice so that when something happens, people can act rapidly? In particular, I would also add, as I mentioned, there are these four companies here: DuPont, Invista, Cororri, and Chumores. They’re all part of the response team. So the Board Mmembers, uh, investigators mentioned there’ll be investigation on the response team. A question I would ask is: Will that investigation include looking into all four companies’ coordinated response? Thank you.

Chair Sutherland: Thank you, Mr. Morawetz. We will welcome the next speaker.

John Burgess: Uh, good evening. My name is John Burgess. I’m a process safety consultant here in Houston. Uh, I – I worked with Mr. Holmstrom before. I have one specific question associated with this particular meeting in that the goal of this meeting is to outline interim recommendations that need to be implemented prior to starting up the facility. And since emergency response was such an inherent part of this, not in the causal part but in the consequence, why are there no recommendations associated with upgrading the, uh, emergency response that need to be implemented prior to restarting the unit?

Dan Tillema: We’ll just give a quick response to that. Um, in general, just to back where – where these recommendations came from, these were the things that we had identified that we thought needed to be done

30015_DuPont Public Meeting (9-30-2015) Chair Sutherland, Member Ehrlich, Member Engler, Member Kulinowski, Donald Holmstrom, Dan Tillema, Tamara Qureshi, Steve Cutchen, Kara Wenzel

www.gmrtranscription.com

39 before start up that DuPont was not willing to do back in June. The emergency response, I think DuPont readily recognized had deficiencies. And they’ve – they’ve definitely taken that very strongly, and they’re working on corrective actions. So they’re not part of our interim recommendations specifically because DuPont is actively working on corrective actions. We haven’t been able to completely evaluate the corrective action plans for those items yet.

But, in general, that’s why they’re not part of these recommendations. Sure, we – we do. I mean, but, you know, as – as – we – we just don’t have all that information prepared right now.

Chair Sutherland: We welcome our next speaker.

John McLain: I’m John McLain. I’m a design professional here in Houston. I also work in process relief systems. Uh, I share his puzzlement about the way API 521 is applied, particularly in different design philosophies, vis-a-vis refining versus chemicals. So I’ve had a lot of discussion with my colleagues now about the way relief valves have short tailpipes going to atmosphere. And the chemical industry, as opposed to the refining industry, which manifolds them and takes – takes them to knock-out drums and disposal systems. So again, we need guidance on these sort of things because they cut across – they’re a huge philosophy difference between different industries, chemicals and refining.

So again, I’d like to reiterate what he says. We’re really in a bit of a pickle here about how to change these practices. And there are a lot of release systems like that in Houston because of the older plants. So I don’t – most of these companies, I don’t think, are going to change because a lot of these things are grandfathered right now. And – and PSA – PHA findings, even though they’re pointing out the deficiencies of the systems, these companies aren’t necessarily responding and changing things, which leads to, of course, the incident that happened in Texas City where a vent stack was used when the flare header had been recommended in previous PHA’s.

So it’s just an expression that perhaps some more regulatory push needs to be applied.

Chair Sutherland: Thank you. We will recognize our next speaker.

30015_DuPont Public Meeting (9-30-2015) Chair Sutherland, Member Ehrlich, Member Engler, Member Kulinowski, Donald Holmstrom, Dan Tillema, Tamara Qureshi, Steve Cutchen, Kara Wenzel

www.gmrtranscription.com

40

Dan Barton: My name is Dan Barton. I represent Wade Baker and his family. First, I’d like to thank the board, Madam Chairperson, and investigative team. I’d – I’d like to thank you for your tireless effort in investigating this matter and your willingness to spend all of the time that we needed for you to answer all of our questions. And when you didn’t have the answers readily available, you emailed me the answers. And I really appreciate that. And I’m impressed with the professionalism of the investigative team. Brent and Larry, my colleagues, have addressed adequately the concept of profits over safety. There’s one thing I would like to address.

And that’s trust. Can we trust DuPont? Can we trust a company who sells a safety program for a profit over many years? And I learned the fact last night that none of the operators or staff have ever seen this safety program that they sell to other corporations and chemical companies. To me, that’s a shame and embarrassing. You can’t trust DuPont. And if you don’t adopt the interim recommendations, what message would you be sending to DuPont and corporate America? And for that reason, I urge you to adopt the – the interim recommendations. Thank you.

Chair Sutherland: Thank you. Are there any final public comments? I would like to thank everyone who made a public comment. Um, we are very, um, open and – and eager to hear comments, suggestions. Um, and I appreciate you all taking the time to share your, uh, sentiments, your urgings, your thoughts, and your stories. Members, uh, if there are no further discussion points, um, or comments from the Board, then I will call for the question. Is there a motion to adopt – did you have a question?

Member Engler: So moved.

Chair Sutherland: I have to read it first. Is there a motion to adopt the proposed interim recommendations on the CSB’s investigation of the DuPont La Porte facility as presented?

Member Engler: So moved.

Member Ehrlich: I second that motion.

30015_DuPont Public Meeting (9-30-2015) Chair Sutherland, Member Ehrlich, Member Engler, Member Kulinowski, Donald Holmstrom, Dan Tillema, Tamara Qureshi, Steve Cutchen, Kara Wenzel

www.gmrtranscription.com

41 Chair Sutherland: Thank you. Having been moved and seconded, there’s a motion to adopt the proposed interim recommendations as presented. We will now conduct a roll call vote of Board Members who will indicate approve or disapprove when called. I will have the Acting General Counsel, Kara Wenzel, lead the roll call.

Kara Wenzel: Member Ehrlich?

Member Ehrlich: Approved.

Kara Wenzel: Member Engler?

Member Ehrlich: Approved.

Kara Wenzel: Member Kulinowski?

Member Kulinowski: Approved.

Kara Wenzel: Member and Chairperson Sutherland?

Chair Sutherland: Approved.

Kara Wenzel: Motion passes.

Chair Sutherland: Thank you, General Counsel. The interim recommendations have passed. They will be, uh, issued formally. Thank you to everyone for your attendance at this public meeting. I thank the team, too, for their dedication to the ongoing investigation. And I know the work that still has to be done. And more importantly, I thank the family and friends, who stayed last night and tonight, uh, to contribute and share comments. We – we thank you, as well, for your patience and participation. With that, the meeting is adjourned.

[End of Audio]

Duration: 131 minutes

FD06479 | 2015_美国_US Ink 火灾 - US Ink Fire__最终报告.pdf

分类:06_境外及港澳台调查报告 | 年份:2015 | 地域: | 严重程度: | 场所: | 起火原因: | 来源格式:pdf

CSB • US Ink Case Study 1 US Ink Case Study Case Study January 2015 Case Study US Ink/Sun Chemical Corporation Ink Dust Explosion and Flash Fires in East Rutherford, New Jersey October 9, 2012 Seven Employee Injuries No. 2013-01-I-NJ This case study examines the explosion and flash fires that occurred at the US Ink manufacturing facility in East Rutherford, New Jersey, on Tuesday, October 9, 2012. Seven workers suffered burn injuries when they congregated at the entrance to the ink mixing room after hearing a loud thump from the newly installed dust collection system on the top of the facility and seeing signs of an initial flash fire from a bag dumping station. A second flash fire then occurred that led to the employee injuries. KEY ISSUES: • Combustible Dust • Engineering Design • Management of Change • Process Hazard Analysis • Hazard Communication • Management Oversight • Regulatory Oversight U.S. Chemical Safety and Hazard Investigation Board

CSB • US Ink Case Study 2 US Ink Case Study Case Study January 2015 1.0 INTRODUCTION On October 9, 2012, at approximately 1:15 pm Eastern Standard Time (EST), a flash fire caused burn injuries to seven workers, including three who sustained third-degree burns, at the US Ink/Sun Chemical Corporation ink manufacturing facility in East Rutherford, New Jersey. Workers were drawn to a black ink mixing room (commonly called the pre- mix room at US Ink) by the initial flash of the fire from a bag dumping station and by a loud thumping noise from the rooftop. As the workers congregated at the doorway, they observed a small fire in the ductwork of a newly installed dust collection system above a process mixing tank. Suddenly, a large flash fire emerged from the pre-mix room and engulfed the seven employees in flames. Coworkers responded to the seven injured employees and took them out of the building. Emergency responding units from the East Rutherford Volunteer Fire Department arrived on scene at 1:20 pm EST. Emergency responders transported the victims to the local hospital while firefighters began combating the fire. After the incident, production was suspended pending internal and external investigation by the company, U.S. Occupational Safety and Health Administration (OSHA), and U.S. Chemical Safety and Hazard Investigation Board (CSB). Some production of colored inks resumed about a week later, but black ink production was halted until the end of December. 1.1 COMPANY BACKGROUND US Ink1, a division of Sun Chemical Corporation, is an ink manufacturer established in 1993 through the merger of two organizations, U.S. Printing Ink and the News Ink Division of Sun Chemical Corporation. US Ink maintains headquarters in Carlstadt, New Jersey, and had seven regional manufacturing locations across the country, including the East Rutherford facility, at the time of the incident. Sun Chemical Corporation is a global graphic arts corporation divided into a number of subsidiaries that encompass different segments of the market (such as ink, plates, pigments, and films). Sun Chemical owns and operates 143 active manufacturing facilities in and outside of the United States, with approximately 9,000 employees worldwide. At the time of the incident, the US Ink East Rutherford facility had 34 employees, and 28 employees were on shift. TABLE OF CONTENTS 1.0 Introduction 2 2.0 Incident Description 9 3.0 Incident Analysis 13 4.0 Sample Test Results and Implications 16 5.0 Engineering Design Analysis 20 6.0 Safety Management Analysis 26 7.0 Regulatory Analysis 29 8.0 Key Findings 35 9.0 Reiterated Recommendations 37 10.0 Recommendations 38 1 See http://www.usink.com/about-us.html.

CSB • US Ink Case Study 3 US Ink Case Study Case Study January 2015 1.2 BLACK INK PROCESS DESCRIPTION The US Ink East Rutherford plant (built in the 1920s) manufactures both black and color oil-based ink for various commercial clients. A key step in the ink production process is mixing solid and liquid ingredients to produce a liquid suspension. The mixing operation for black ink ingredients is performed in the pre-mix room, where the October 9, 2012, incident occurred. Figure 1 depicts a simplified plan view of the pre-mix room containing three large mixing tanks in which the various ink formulations are made. The room is 30 feet wide by 17 feet deep and has cinder block walls up to the 30-foot ceiling height. The black ink manufacturing process at US Ink involved the pneumatic transfer2 of bulk solid powder under vacuum to one of three mixing tanks, labeled as 106, 206, and 306 (T-106, T-206, and T-306, respectively). FIGURE 1 Pre-mix room layout3 Two solid ingredients, carbon black and kaolin clay, are received by rail (while Gilsonite is shipped by truck) to the facility and are transported to the mixing tanks by vacuum through piping from a manual raw material feeding station (known at US Ink as the bag dump station,4 shown in Figure 2) or by gravity from three overhead receiver hoppers containing carbon black and kaolin. The liquid ingredients are transported to the facility via rail and are pumped into the mixing tanks via pipes connected to the bottom of the tanks. All three mixing tanks are 5 feet in diameter and about 10 feet high. Operators coordinate 2 The pneumatic transfer process is a mechanical method of conveying materials via compressed or pressurized gases. 3 This diagram is not drawn to scale. 4 The bag dump station was positioned in the doorway of the pre-mix room. An overhead rollup service door was installed for access to the pre- mix room. At the time of the incident, the CSB found that the rollup service door was chained into a fixed rolled-up position to provide easier entry into the room. Witness accounts from plant employees and contractors indicated that Gilsonite dust generated from the bag dumping operation often accumulated around the facility but particularly on flat surfaces. US Ink did not provide an effective means of containing fugitive dust at the bag dumping station because emptied bags were often stacked alongside the bag dump, which in turn lofted dust into the air.

CSB • US Ink Case Study 4 US Ink Case Study Case Study January 2015 the ingredient mixing process and monitor tank weights and temperatures from a control room adjacent to the pre-mix room. An automatic sprinkler system5 was installed as a fire protection feature in the pre-mix room.6 When complete, the mixed suspension contains both combustible and noncombustible particulate ink components. The heat generated as the solids are dissolved in the mixing tank increases the solution temperature to about 240°F. This increase in operating temperature is useful because it ensures complete dispersion of the solid materials into the liquid phase; it also contributes to greater evolution of condensable vapors. Once mixing is completed, a laboratory technician analyzes ink quality. If cleared, the batch is pumped into an empty tank for further processing (milling) and then to another tank in preparation for delivery to customers. Each batch weighs about 6,600 pounds when completed. 1.3 DUST COLLECTION SYSTEM Before October 2012, the facility used a wet scrubber system7 to collect particulate materials during the dry material charging stages of the ink mixing process. However, the scrubbing system deteriorated over the years. In addition, the wet scrubber system did not prevent the release of fugitive dust into the pre-mix room when new ink formulations used higher powdery clay content, producing higher levels of particulate emissions. Therefore, a new particulate dust collection system was needed. The new dust collection system was installed to improve the management of particulate material and produce an overall improvement in the operating conditions of the black ink production process. 5 The sprinkler system was also connected to an automatic audible alarm. Once the sprinkler system was activated, an automatic signal was relayed via an external central monitoring station to the local fire department for immediate response. 6 During the incident, the sprinklers were activated after the second flash event. 7 Wet scrubber systems are devices that remove pollutants from a furnace flue gas or from other gas streams. In a wet scrubber, the polluted gas stream is brought into contact with the scrubbing liquid by spraying it with the liquid, forcing it through a pool of liquid, or using some other contact method to remove the pollutants. Wet scrubbers remove dust particles by capturing them in liquid droplets. FIGURE 2 Bag dump station

CSB • US Ink Case Study 5 US Ink Case Study Case Study January 2015 A US Ink lead engineer worked in collaboration with the manufacturer of the dust collection system8 to design the new dust collection system. The engineer retired before the dust collection system was installed and commissioned on Friday, October 5, 2012.9 The dust collection system illustrated in Figure 3 consisted of a branching system of various sizes of ducts, including flexible connectors attached to the top of each mixing tank and to the bag dump station. The flexible ducts joined an 8-inch duct, which transitioned to a 9-inch duct and ultimately a vertical 12-inch duct (riser) going up through the pre-mix room ceiling. Dust particles were suctioned though the ducts and riser into the exhaust fan–driven dust collector, located on the roof of the facility (Figure 3). 8 Additional design specifications and support were provided by other US Ink engineers and by representatives of the manufacturers of the duct- work, dust collector, and fire explosion suppression and isolation system that was coupled to the dust collection system. 9 In Section 6, Safety Management Analysis, of this report, the CSB concludes that the engineer’s retirement led to a less comprehensive design review and commissioning process for the dust collection system. FIGURE 3 Overview of the newly installed dust collection system

CSB • US Ink Case Study 6 US Ink Case Study Case Study January 2015 The roof-mounted dust collector used an eight (four rows of two each) cylindrical filter cartridge system to remove the residual particulate dust. Dust-laden air and vapor from the mixing tanks entered the collector above the four cylindrical filter cartridges and was drawn down over the cartridges, where the dust was removed from the air stream. The dust collector was mounted with a 25-horsepower (hp) fan and an inlet total static pressure rating of a 17-inch water column. The 25-hp fan was designed to convey dust up to the collector at an airflow volume rate of 3,300 cubic feet per minute. The dust collector was mounted with a system fan with a 25-hp motor. The mounted fan for the dust collector discharged through a high-efficiency particulate air (HEPA) filter and then into the atmosphere. Compressed air periodically pulsed through the filter cartridges to dislodge the filtered dust into the hopper of the dust collection system. The collected dust was recycled into the ink-making process. A rotary airlock on the bottom of the hopper used gravity to control the discharge of recycled fugitive dust from the collector and back into the mixing tank (T-106) for reprocessing in the pre-mix room. Beyond the rotary air lock valve, the 10-inch- diameter pipe reduced to 4 inches in diameter at T-106. The company added three housekeeping connections, not included in the initial design, to the vacuum system of the dust collection system for operator use in picking up dust and other debris in the pre-mix room.10 This auxiliary equipment attached to the ductwork associated with the bag dump station and to the main ducts above T-206 and T-306. The dust collector included an explosion suppression system (shown in Figure 4 and Figure 5), which would actuate and release the suppressant, sodium bicarbonate, if a rapid pressure increase occurred in the dust collector. The design intent focused on preventing damaging explosive overpressures in the collector and inlet duct in the event of a drastic pressure rise and on containing any explosion hazard within the dust collector.11 Fike Corporation12 manufactured the explosion suppression and chemical isolation system, and the designers recognized the explosion hazard associated with dust. US Ink/Sun Chemical Corporation provided information—including specification of the raw materials utilized in the black ink pre-mix process, flash point of oils, and dust deflagration index (KST) values for solid ingredients—to the manufacturer of the explosion suppression and isolation system. Although US Ink/Sun Chemical originally considered a roof-mounted dust collector equipped with explosion vent panels for explosion protection and with a mechanical isolation valve, US Ink decided instead to use an explosion suppression and chemical isolation system. US Ink based this decision on reduced installation costs and external recommendations (from Fike and the third-party property loss prevention and risk management consultants hired by US Ink) to avoid any potential environmental releases of combustible dust particulates (or fire) into areas near residences. The new dust collection system was commissioned at the facility in the week preceding the incident. The flash fire occurred in the dust collection system during the first day of normal production after initial equipment start-up, on Tuesday, October 9, 2012. 10 The dust collection system design included four dust pickup points: three housekeeping connections and the opening at the bag dump station. The ductwork at the top of each mixing tank had a connection (6 inches in diameter) for dust collection, and two 6-inch connections at the bag dump hood allowed suctioning of dust particles from the dumping station. In addition, three 3-inch ducts were reduced to 1.5 inches in diameter for vacuum cleaning hoses that were added to the ductwork design for housekeeping purposes. 11 The explosion suppression system would actuate and inject sodium bicarbonate via an independent suppression container and chemical isolation container located at two injection points in the system: the dust collector hopper (Figure 4) and the collector inlet riser (Figure 5). The suppressant was designed to be injected if a rapid pressure rise occurred in the dust collector and was intended to suppress a flame front from propagating from the dust collector back through the riser into the interconnected ductwork and pre-mix room. 12 See www.fike.com.

CSB • US Ink Case Study 7 US Ink Case Study Case Study January 2015 FIGURE 4 Dust collector with explosion suppressant FIGURE 5 Dust collector inlet with explosion isolation Inlet riser (to dust collector) Explosion isolation container Dust collector hopper Explosion suppression container

CSB • US Ink Case Study 8 US Ink Case Study Case Study January 2015 1.4 MATERIALS INVOLVED IN THE INCIDENT The US Ink facility produces black and color oil-based inks for various clients but primarily for the print media industry. A typical black ink formulation at the East Rutherford plant includes the following ingredients: • Petroleum napthenic distillate13 (product name: Raffene® 750K oil) • An alternative petroleum distillate (product name: mineral seal oil) • Natural asphalt resin particulate (product name: Gilsonite14) • Carbon black particulate pigment (product name: Printex 31015) • Bentonite (aluminum silicate clay) particulate (product name: Bentone 34) • An alternative aluminum silicate clay (product name: kaolin) • Tall oil fatty acid, a minor ingredient (additive) Gilsonite and carbon black are combustible while the petroleum distillate is flammable, so they can be considered as possible contributors to the formation of the explosive atmosphere on the day of the incident.16 The boiling points and flash points of the two oils are listed in Table 1. Mineral seal oil18 is more volatile than Raffene oil, but the flash points of both oils are sufficiently high (more than 200°F) to make them Class IIIB liquids according to the combustible liquids classification in the National Fire Protection Association (NFPA) code NFPA 30, Flammable and Combustible Liquids Code.19 Occasionally, US Ink also used linseed oil, but not in the batches blended before the incident. 13 Petroleum distillates (e.g., hydrocarbons such as mineral spirits, kerosene, white spirits, and naphtha) are often used as an organic solvent in painting and decorating (http://www.northerntails.com/images/What_are_Petroleum_Distillates.pdf). Heavier fractions such as naphthenic or paraffinic distillates are often used in ink manufacturing processes. 14 Gilsonite, a resinous hydrocarbon, is widely used as the primary carbon black wetting agent for black news inks and heat set and gravure inks. Gilsonite has a National Fire Protection Association (NFPA) flammability rating of 1, and special precautions warn that dust is subject to explosion upon contact with sparks, open flames, or temperatures in excess of 1,000°F (570°C). 15 Carbon black, with a particle size of PM-10 (particles with a diameter of 10 micrometers or less), is an odorless and insoluble powder with an atoignition temperature greater than 284°F. It can burn or smolder (decompose) at temperatures greater than 572°F and is virtually pure elemental carbon in the form of colloidal particles that are produced by incomplete combustion or thermal decomposition of gaseous or liquid hydrocarbons under controlled conditions. Although some grades of carbon black are sufficiently electrically nonconductive to allow a static charge buildup during handling, dust at sufficient concentrations can form explosive mixtures with air. Carbon black has an NFPA flammability rating of 1. 16 The American Gilsonite Company Material Safety Data Sheet (MSDS) for Gilsonite resin indicates that Gilsonite is not hazardous; however, in the storing and handling section, the MSDS states, “Avoid raising any powdered material into dust explosion hazard.” The MSDS for carbon black states that OSHA classifies the product as hazardous and that dust at sufficient concentrations can form explosive mixtures with air. The MSDSs do not reference NFPA standards except in a carbon black MSDS where NFPA ratings are provided. Sun Chemical did have guidance on combustible dust (SunCare HSE Procedure 065, Combustible Dust), which included a section for references that listed NFPA 35, 68, 77, 484, and 654. 17 Citgo Petroleum Corporation, Mineral Seal Oil Material Safety Data Sheet (http://www.docs.citgo.com/msds_pi/19540.pdf). 18 The Citgo mineral seal oil MSDS suggests that it can burn but does not readily ignite. Mineral seal oil releases vapors when heated above the flash point temperature. In addition, it can ignite when exposed to a source of ignition. In enclosed spaces (such as the ductwork of the dust collection system), heated mineral seal oil vapor can ignite with explosive force. Mists or sprays can burn at temperatures below the flash point (http://www.docs.citgo.com/msds_pi/19540.pdf). TABLE 1. OIL PROPERTIES (FROM MATERIAL SAFETY DATA SHEETS) Property Raffene Oil 750K Mineral Seal Oil17 Open cup flash point 360°F 275°F Initial boiling point 550°F 492°F Autoignition temperature Not given Not given

CSB • US Ink Case Study 9 US Ink Case Study Case Study January 2015 2.0 INCIDENT DESCRIPTION 2.1 EVENTS BEFORE THE INCIDENT The new dust collection system for the pre-mix room was commissioned for service on the morning of Friday, October 5, 2012, and then operated until the end of the production shift at 3:00 pm EST.20 At commissioning, US Ink employees who would operate the system (several black ink production supervisors and one of the day-shift operators) received 15 minutes of operational training and instruction as well as a walkthrough of the Fike explosion suppression and isolation system.21 Both the dust collection system and the Fike explosion suppression and isolation system were equipped with control panels (containing system status indicator lights), installed on the wall near the pre-mix room (Figure 1). As designed, the dust collection system started automatically when any of the mixing tank motors was energized and automatically shut off (after a specified delay) when all mixers were inactive. However, the dust collection system actually continued to run overnight, even when all the ink mixers were shut off.22 On Saturday, October 6, 2012, the plant maintenance employees used housekeeping connections on the new dust collection system to vacuum dust and debris in the pre-mix room. A US Ink maintenance employee reported in an interview that upon his arrival on Saturday, although the mixing tanks were shut down the night before, the dust collection system had run all night, a departure from the initial design intent of automatic start-up and shutdown, in sync with the mixing tanks.23 At the end of housekeeping activities, a maintenance employee manually shut down the dust collection system. Although the maintenance employee reported the dust collection system equipment malfunction to his superiors and to the electrical contractor that wired the dust collection system, US Ink/ Sun Chemical Corporation management took no action to immediately investigate the failure or to shut down the ink mixing operation until the malfunction was corrected.24 Employees restarted the mixing tanks and the dust collection system on the Monday night shift, October 8, 2012, in preparation for the production runs scheduled for Tuesday, October 9, 2012. 19 NFPA, a nonprofit standards organization, has been developing standards since 1896 that directly affect fire services at the department level. NFPA produces more than 300 consensus codes and standards intended to minimize the possibility and effects of fire and other risks (http:// www.nfpa.org/about-nfpa). The codes are voluntary standards that industry can adopt and regulatory agencies can enforce. Standards are an attempt by an industry or profession to self-regulate by establishing minimal operating, performance, or safety criteria. 20 Representatives from Fike had earlier provided a system orientation of the explosion suppression and isolation system to the US Ink maintenance staff on October 1, 2012. 21 Section 5, Engineering Design Analysis, includes a discussion of the failure to conduct system performance measurement at start-up and com- missioning of the dust collection system. 22 The dust collection system was designed to be controlled by a controller whenever it was running, and the controller was set up to continuously control the fan and pulse jets whenever the dust collection system was in operation. However, the automatic shutoff did not engage as designed once the system was energized and thus had to be manually turned off and on by US Ink maintenance employees and pre-mix room operators. 23 The CSB did not find any evidence that the automatic start system worked in sync with the mixing tanks at commissioning. 24 US Ink/Sun Chemical Corporation management did not give stop-work authority to the maintenance employee or the night-shift pre-mix room operator to shut down dust collection system operation once a malfunction was reported. US Ink claimed it encouraged employees to report unsafe acts; however, the CSB did not find any record of a US Ink requirement for employees to shut down any equipment perceived as faulty that could lead to an unsafe condition or hazards. This lapse in management oversight allowed the dust collection system to continue running during the ink mixing operation until the system eventually failed on Tuesday, October 9, 2012.

CSB • US Ink Case Study 10 US Ink Case Study Case Study January 2015 2.2 ONSET OF FLASH FIRE AND EXPLOSION On Tuesday morning, October 9, 2012, black ink production continued, with batches being run in all three mixers. When the batch in T-306 was completed, the pre-mix room operator emptied the tank. The operator left for lunch at about noon and returned to the pre-mix room at about 12:30 pm EST. At that time, a new ink batch was started in T 306. At about 1:00 pm, the pre-mix room operator was loading Gilsonite into the bag dump station (Figure 1) when he heard a strange (squealing)25 noise from T-206. Because of the odd noise, the operator went to the control room to check the mixing tank temperature and speed to confirm that the equipment was working properly. As he left the control room, he saw a flash fire originating from the bag dump station where he had just been working. Without shutting down the mixing operation and the dust collection system from the control panels near the pre-mix room, the operator immediately proceeded to his supervisor’s office to alert him of the fire, moving away from the pre-mix room. At about the same time, other workers heard a loud thump that shook the building. In response to the flash from the bag dump station and the subsequent loud thump, workers congregated at the entrance to the pre-mix room. Employees stated that the rubberized spiral-wound duct hose material that connected T-306 to the dust collection riser appeared to be melting and dripping onto the tank (Figure 6). 25 The squealing noise signaled a possible increase in the amperage, which would have necessitated the addition of more oil to the mixing tank. The pre-mix room operator testified to the CSB that upon checking the amperage chart for the mixing tanks, he discovered that everything was fine. FIGURE 6 Burned ductwork over T-306

CSB • US Ink Case Study 11 US Ink Case Study Case Study January 2015 2.3 INCIDENT AND INJURIES Two employees retrieved fire extinguishers to put out the flames. One employee ascended the stairs near T-306 in an attempt to extinguish the flames. The employee reported that before he was in position to discharge the extinguisher, he heard a “sizzling” sound from T-306 and saw an orange fireball erupt, advancing toward him. He squeezed the extinguisher handle and jumped from the stairs as fire erupted from the tank. The flames engulfed him and six other employees who were positioned outside the pre-mix room doorway. Another employee who approached the pre-mix room area noticed that the lights on the alarm panel for the dust collector explosion suppression system were red, indicating detection of a pressure rise and activation of the system. However, this system did not produce an audible alarm.26 The employee alerted the other workers in the area that the explosion suppression system had activated and there was a fire. Just seconds before the large flash fire at T-306, the employee retreated from the pre-mix room area to call 911, but after running 25 to 30 feet, he was knocked to the ground by the pressure wave caused by the fireball. Witnesses observed not only the initial fireball from T-306 but also a thick black cloud venting into the corridor27 just ahead of the fireball, and they reported an audible “whoosh.” These observations are consistent with the sights and sounds of a combustible dust deflagration.28 All employee burn injuries resulted from the large flash fire and heated dust mixture that originated from above T-306 and propagated into the corridor from the entrance of the pre-mix room. The injured employees had clothing covered in black dust, and they experienced burns to exposed skin. Some burns occurred after their clothing ignited from the fireball. The injuries consisted mostly of burns to upper torsos, arms, necks, and heads. Other employees helped the injured employees out of the plant, and emergency responders transported the injured to hospitals. One of the injured employees was wearing a short- sleeve T-shirt that day and sustained third-degree burns on his left arm, neck, and upper torso. The employees were not wearing flame-resistant clothing (FRC). To reduce the risk of thermal injury from flash fire incidents in production-related operations, workers are required to wear FRC. As part of its personal protective equipment (PPE) standard (29 CFR 1910.132), OSHA requires employers to provide workers with FRC in workplaces when flash fire or explosion hazards are present.29 This standard also mandates that employers must conduct a hazard assessment of their workplaces to identify hazards that require the use of protective equipment. Because the US Ink facility 26 US Ink/Sun Chemical maintained that Fike did not fulfill its requirement to fully install and ensure the operation of an audible alarm, despite providing an initial specification that indicated the presence of an audible alarm. Best practices indicate that US Ink should not have accepted the new dust collector as complete if system start-up checks revealed that the audible alarms were not working as expected. Fike attested that the local visual and audible alarm for the explosion suppression and isolation control was operating when verified on October 1, 2012. However, the local audible output might not have been heard by US Ink employees on the day of the incident due to the room ambient noise in the room. Also, US Ink did not incorporate any other area or building -wide audible or visual alarm or emergency responder notifications into their notification strategy. 27 CSB investigator observations of the ceiling of the US Ink East Rutherford facility shortly after the incident indicated the outward L-shaped path of the fireball along the corridor near the pre-mix room. 28 A deflagration is the propagation of a flame through a fuel-air mixture at less than the speed of sound. It can be either a flash fire or an explosion, depending on the level and consequences of the pressure generated during flame propagation. 29 FRC can reduce the severity of burn injuries sustained during a flash fire when engineering and administrative controls fail. Usually worn as coveralls, FRC is made of treated natural or synthetic fibers that resist burning and withstand heat.

CSB • US Ink Case Study 12 US Ink Case Study Case Study January 2015 did generate dusts, the potential existed for a dust explosion, flash fire, or both. If US Ink had followed OSHA standards on hazard assessment and PPE selection, the US Ink/Sun Chemical safety managers would have identified “harmful dust” and provided additional PPE. NFPA 2113 provides guidance for the selection, use, and maintenance of FRC.30 NFPA 2113 states, “Factors in determining if flame-resistant garments are required shall include the presence of flammable materials in the environment during process operations.” This standard would include dust generated during the ink mixing process. The CSB learned that no corporate policy required the use of FRC by US Ink plant employees.31 2.4 FIRE DEPARTMENT AND EMERGENCY RESPONSE The flash fire triggered the fire sprinkler system in the pre-mix room. Firefighters and other first responders arrived at the scene of the incident within 3 minutes of the first alarm.32 After they arrived and entered the plant, East Rutherford Fire Department personnel did not see any flames in the pre-mix room because the sprinklers had extinguished fires outside of the enclosed equipment. Although they observed no visible signs of flames after the large flash event at T-306, responding firefighters reported that after checking with their heat sensors, they detected several ductwork fires and extinguished them with water after separating the affected ducts. The firefighters went up to the dust collector on the roof and opened the four covers on the cartridges but did not need to extinguish any residual burning materials in the collector because the explosion suppression and isolation system, which was designed to respond to any explosion within the dust collector, had already prevented the fire from entering the dust collector after the initial event. The design of the chemical suppression and isolation system protected the dust collector from explosion within the collector but did not extinguish any external fires.33 30 National Fire Protection Association, NFPA 2113: Standard on Selection, Care, Use, and Maintenance of Flame-Resistant Garments for Protection of Industrial Personnel Against Short-Duration Thermal Exposures, 2012 Edition (Quincy, MA: NFPA, 2012). 31 Sun Chemical Corporation, “Sun Chemical Material Safe Handling Form.” This form indicated the following for recommended personal protective equipment (PPE): respirator (organic vapor cartridge) or self-contained breathing PPE apparatus, disposable sleeves worn over long-sleeved uni- form tops or disposable Tyvek suit, nitrile or Neoprene gloves, and safety glasses with side shields. In addition, the corporate Health, Safety and Environment (HSE) PPE policy lists examples of types of PPE that could be used, including protective clothing; however, FRC is not listed as a specific type of protective clothing. Although employees received some communications regarding appropriate PPE, the CSB investigation could not find any evidence to indicate that US Ink actually supplied FRC to employees. 32 East Rutherford Fire Department, East Rutherford Fire Department Inspection and Incident Report, October 22, 2012. 33 National Fire Protection Association, NFPA 654-2006: Standard for the Prevention of Fire and Dust Explosions from the Manufacturing, Processing, and Handling of Combustible Particulate Solids, Section 7.13.1.2.1. This section states that where both an explosion hazard and a fire hazard exist in an air material separator, protection for each type of hazard shall be provided.

CSB • US Ink Case Study 13 US Ink Case Study Case Study January 2015 The CSB investigated three possible points of origin of the fire: within the dust collector, within the ductwork above T-306, or within T-306. Chemical test results,34 engineering design analysis,35 physical evidence of excessive deformation, heat charring of the ductwork directly above T-306, and corroborated witness testimony all indicated that the fire originated within the ductwork of the dust collection system. 3.1 SEQUENCE OF FIRE AND EXPLOSION EVENTS The CSB concluded that the explosion and flash fires occurred because of continuous manually controlled heating of the mixing tanks and operation of the dust collection system for several hours after commissioning, with the system continuing to draw condensable vapors into the duct. Continuous operation of the dust collection system led to self-heating and spontaneous self-ignition of the accumulated sludge-like material and the powdery dust mixture of Gilsonite, carbon black, and clay in the ductwork above T-306. As a result of this activity, the dust collection system drew air past the site where the spontaneous ignition occurred, thereby enhancing combustion of the condensed vapors and combustible dust. With the dust collection system still in operation, the air in the system blew the dust mixture toward the collector while the fire burned. This situation caused ignition and a pressure rise in the dust collector, which was already filled with the blend of Gilsonite, carbon black, and clay. Although the ignition led to a dust explosion within the dust collector, the pressure rise activated the Fike explosion suppression system, which prevented the structural failure of the dust collector.36 The pressurized discharge of the explosion suppression canister caused the thumping sound that employees heard coming from outside the building. At the same time, the ignition at the dust collector and discharge of the 5-liter suppression and 9-liter 3.0 INCIDENT ANALYSIS THREE DISTINCT EVENTS OCCURRED DURING THIS INCIDENT:

  1. An employee observed a flash originating from the bag dump station, which attracted

the attention of several workers in the area.

  1. At about the same time, workers heard a large thumping sound that they described

as coming from overhead, accompanied by a pulse that shook the entire building, drawing more workers from their respective workplaces to investigate.

  1. After about 2 minutes, seven workers observed an approximately 1-foot flame

directly over T-306. The flame then gained additional energy from the powdery mixture of accumulated carbon black, Gilsonite, and clay in the ductwork of the dust collection system. The mixture acted as fuel, and the fire flashed over the assembled workers in the doorway of the pre-mix room. 34 Chemical test results are discussed in detail in Section 4, Sample Test Results and Incident Implications. 35 Engineering design analysis is covered in detail in Section 5, Engineering Design Analysis. 36 The Fike explosion suppression and isolation system prevented the structural failure of the dust collector by suppressing the deflagration and isolating the dust collector as designed.

CSB • US Ink Case Study 14 US Ink Case Study Case Study January 2015 isolation canisters created a pressure spike of 4.4 pounds per square inch gauge (psig) in the dust collector and caused the flame front to propagate counter-current toward the mixing tanks. This rapid pressure rise (and the associated rapid flame propagation back through the ducting) triggered an initial flash fire at the bag dump station and within the rubberized ducts above T-306 (where the second and more volatile flash fire occurred). After the incident, the CSB learned that the design total suppression pressure (maximum design pressure for suppressed explosion) predicted for the dust collector was 3.8 psig. The increase in the total suppression pressure occurred because of the higher rate of pressure rise of the dust mixture compared to the expected design KST of 165 bar-meters per second (bar-m/sec).37 3.2 FIKE EXPLOSION SUPPRESSION SYSTEM DATA Suppression Systems Incorporated (SSI)38, a Fike distributor, provided pressure sensor data retrieved from the memory of the Fike system, using plots attached to a December 2012 Fike incident report. The report indicated that both the 5-liter extinguishing agent container on the dust collector and the 9-liter extinguishing agent container on the inlet duct discharged as designed on the day of the incident. The pressure sensor data pulled from the Fike system on the day of the incident shows the sequence of events in the dust collection system. The recorded data are shown in the graph in Figure 7. 37 This is addressed in Table 3, ASTM E1226 dust explosibility test data. 38 SSI is a Fike distributor and the installer of the Fike dust collection system at US Ink. 39 The Fike system design plot is based on a dust explosion hazard corresponding to a maximum pressure (PMax) of 10 bar gauge (barg) and a normalized rate of pressure rise (KST) of 165 bar-m/s. FIGURE 7 Annotated Fike system pressure plot 39

CSB • US Ink Case Study 15 US Ink Case Study Case Study January 2015 3.3 IMPACT OF THE ELIMINATION OF THE SCRUBBER SYSTEM Before installation of the dust collection system, employees observed vapor escaping from the mixing tanks. When the wet scrubber system was removed, an unsealed makeshift vapor absorbent was installed at the opening of the tank heads. The operators used the vapor generation to gauge the speed and temperature of the mixing process. This qualitative information was the basis for their adjustment of the mixing process speed and served as their indicator of the escape of vapor from the process. Despite this, US Ink maintained that the operators relied on their training in the process to properly operate the mixers. In addition, the temperature of each of the tanks was measured and available at all times to the operators. Moreover, each batch ticket specified the target operating limits, which the operator used to prepare each batch of ink. US Ink/Sun Chemical claimed that each operator was trained to monitor the mixer temperature to ensure that it remained sufficiently low and to adjust the mixing operation accordingly to mitigate high mixing temperatures. However, one of the plant operators testified to CSB investigators that he relied on his individual instincts, observations of combustible vapor, and sounds generated during the mixing process to manually adjust (from the control room) the speed of the tank mixing agitators. After examining the US Ink control room, the CSB concluded that despite the presence of temperature gauges and recorders, no temperature control system governed the mixing tanks and that the ink mixing process design did not define any safe temperatures. With no automatic temperature control and no guidelines, plant operators relied on individual instincts, observations of vapor from combustible liquids, and sounds generated during the mixing process as the basis for manually adjusting (from the control room) the speed of the tank mixing agitators. After installation of the dust collection system, operators in the pre-mix room could not observe the vapor and use it as an indicator because the dust collection system metal ducts were connected to the opening of the mixing tank heads. In addition, after removal of the scrubber system, the combustible vapor generated by the ink mixing operation could no longer be eliminated because the new dust collection system was not designed to release condensable vapor. The vapors subsequently were trapped within the ductwork of the dust collection system.40 3.4 PHYSICAL ANALYSIS OF THE BUILDING AND MIXING TANKS Although minor cracks were visible on the exterior of the building wall, this incident caused no apparent structural damage to the building. Equipment in the pre-mix room (including ductwork, motors, electrical cables, and conduit) sustained extensive thermal damage. Portions of the dust collection ducting were separated, and at least one housekeeping connection end cap blew off. Moreover, extensive smoke and dust deposits accumulated on the structure and equipment surfaces in the hallway (ostensibly caused by the burning fireball) and around the pre-mix room. After the incident, the CSB commissioned a visual and video borescope inspection41 of the mixing tank (T-306) to determine whether the second flash fire originated within T-306. The inspectors opened the top hatch and found the liquid level just below the set of toothed vertical agitation blades. Thick ink coatings were apparent on the visible portions of the interior walls and the top of the tank. The tank and mixing elements showed no indication 40 Section 5, Engineering Design Analysis, discusses the lack of consideration of the presence of condensable vapor in the ductwork. 41 A borescope is an optical instrument used to inspect work areas or the inside of structures that are inaccessible by other means. The borescope is often inserted into the structure or work area through a small hole.

CSB • US Ink Case Study 16 US Ink Case Study Case Study January 2015 of thermal degradation. In addition, the inspectors removed the motor of the overhead agitator on T-306 to check for damage to the agitation blades and found no major damage, only regular wear on the blade edges. 4.0 SAMPLE TEST RESULTS AND INCIDENT IMPLICATIONS The CSB observed removal of the dust collection system ductwork in December 2012. Investigators collected residue samples from six sections of the entire ductwork system (shown in Figure 8). They inspected the interior of various ductwork sections and took material samples from inside the ducts. These inspections revealed large accumulations of black, burned, and unburned materials. Most of the accumulations appeared to be black sludge–like material. The CSB investigators collected samples of the sludge-like material for further chemical composition analysis and testing to develop possible ignition scenarios. Several different types of tests were conducted on the samples. Chemical composition analyses were performed, using Fourier transform infrared spectrometry and gas chromatography/mass spectrometry. Ignitability and dust explosibility tests were conducted, FIGURE 8 Ductwork sections for sampling

CSB • US Ink Case Study 17 US Ink Case Study Case Study January 2015 using the ASTM International42 standard test method for ignition temperatures, minimum ignition energy, and dust explosibility. The composition analysis showed that the duct sludge was a mixture of hydrocarbon oil, clay, and carbon black. Table 2 lists the different tests performed to develop possible ignition scenarios and the associated results. TABLE 2. TEST RESULTS Sample Description Test Conducted Values 750 oil from supply tank Closed cup flash point 378°F Oil from T-306 Closed cup flash point 392°F Oil from T-206 Closed cup flash point 338°F Oil from T-106 Closed cup flash point 361°F Carbon black Hot air over layer ignition temperature 676°F Gilsonite Hot air over layer ignition temperature 453°F Carbon black Dust cloud minimum ignition energy

10 J

Gilsonite43 Dust cloud minimum ignition energy mJ Residue from duct section 2 Self-heating onset temperature 340°F Residue from duct section 2 (lower region) Spontaneous heating value 1°F Residue from duct section 2 (upper region) Spontaneous heating value 0°F Residue from duct section 3 Spontaneous heating value 0°F Residue from duct section 4 (lower region) Spontaneous heating value44 0°F Residue from duct section 4 (middle region) Spontaneous heating value 3°F Residue from duct section 4 (upper region) Spontaneous heating value 4°F 42 ASTM International (formerly the American Society for Testing and Materials) is a standards organization that develops, publishes, and delivers voluntary international consensus technical standards (http://www.astm.org/ABOUT/overview.html). 43 Previous incidents involving Gilsonite fires and explosions have occurred in underground mines. One such incident occurred in December 1910 in an asphalt mine in Oklahoma. In 1945, a fire resulted from a Gilsonite explosion at the Bonanza Mine in Utah. In 1953, a violent explosion and fire at the only Gilsonite mine in Utah killed eight miners (http://www3.gendisasters.com/utah/8897/bonanza-ut-mine-blast-kills-eight-nov-1953). 44 ASTM International, ASTM 3523-92: Standard Test Method for Spontaneous Heating Values of Liquids and Solids (Differential Mackey Test). According to this method, the spontaneous heating value of a substance is a measure of the ability of that substance to undergo self-heating reactions while supported by cellulosic or other fibrous materials in the air. It is an index of the autoignition tendency of the substance under such conditions. The spontaneous heating value can be lower than the test temperature. A negative result does not preclude spontaneous heating initiating at a temperature higher than the test temperature.

CSB • US Ink Case Study 18 US Ink Case Study Case Study January 2015 4.1 IGNITION TEMPERATURE AND SPONTANEOUS HEATING TESTS The oil flash points and powder layer ignition temperatures are all higher than both the typical 240°F temperature for the mixing tanks and the maximum 300°F recorded for T-306 and T-106 on the day of the incident. The spontaneous heating data indicate a low tendency for spontaneous residue heating at temperatures around 180°F. Although the residue self- heating onset temperature was 340°F, the duct sludge before the incident would have had a lower self-heating onset temperature because it would have contained the more volatile components subsequently driven off during the incident fires. 4.2.MINIMUM IGNITION ENERGY TESTS Minimum ignition energy (MIE)45 tests were conducted for Gilsonite and carbon black dust to determine their level of susceptibility to electrostatic discharge.46 The low MIE measured for the Gilsonite sample, less than 3 millijoules (mJ) demonstrated that Gilsonite47 dust clouds are susceptible to ignition from electrostatic discharges. However, the Gilsonite in the main trunk of the dust collector ductwork was mixed with carbon black and with oil vapor condensates. Because the carbon black was conductive, it greatly reduced the chances for electrostatic charging of high-resistivity materials such as the dust collector filter cartridges. Furthermore, the carbon black had a high MIE, more than 10 joules (J), making it not susceptible to electrostatic discharge ignitions unless mixed with enough Gilsonite to produce a mixture with an MIE less than 100 mJ. Therefore, electrostatic discharge ignition in the dust collector was less likely than the scenario described previously (i.e., duct accumulation, self-heating, and autoignition). 4.3.DUST EXPLOSIBILITY TESTS The CSB conducted ASTM E122648 explosibility tests to determine the explosion severity of the dust involved in this incident. Table 3 shows the resulting explosion pressure (PMax) and normalized maximum rate of pressure rise (KST) values for carbon black, Gilsonite, and dust samples collected within the dust collector. TABLE 3. ASTM E1226 DUST EXPLOSIBILITY TEST DATA Dust Sample Material Particle Size Tested Pmax (barg) KST (bar-m/sec) Carbon black 98% <75 µm 8.0 98 Gilsonite (first sample) 98% <75 µm 8.1 199 Gilsonite (second sample) 97% <75 µm 7.5 235 Dust collector sample 1 98% <75 µm 8.3 123 Dust collector sample 2 98% <75 µm 7.6 102 45 MIE is the minimum amount of energy required to ignite a combustible vapor, gas, or dust cloud. 46 An electrostatic discharge occurs when two separated surfaces come into contact and then accumulated charges are transferred from one surface to the other via a discharge. For an electrostatic discharge to occur, one of the surfaces must be highly electrically insulating. 47 The National Institute for Occupational Safety and Health conducted explosibility testing based on experimental mine explosions that indicated Gilsonite is 84 percent volatile, much higher than coal dust at 36 percent volatile (http://www.msha.gov/S&HINFO/RockDusting/JLP-Exp-Mine- paper%20emald.pdf). 48 ASTM International, ASTM E1226: Standard Test Method for Pressure and Rate of Pressure Rise of Combustible Dusts. This method indicates that the values for maximum explosion pressure (PMAX) and maximum rate of pressure rise are determined by using a 1-cubic-meter (m3) or 20-liter sphere test apparatus. The dust sample is dispersed within the sphere and ignited by chemical igniters, and the pressure of the resulting explosion is measured. The cloud concentration is varied to determine the optimal dust concentration. The PMAX and maximum rate of pressure rise are measured and used to calculate the dust deflagration index (KST) value of the dust cloud. These data can be used to design dust explosion protection measures (such as explosion relief venting, suppression, and containment) and to classify the explosion severity of a material.

CSB • US Ink Case Study 19 US Ink Case Study Case Study January 2015 According to an SSI system design drawing, the design for the Fike dust collector explosion suppression and isolation system was based on a dust explosion hazard corresponding to a maximum pressure (PMax) of 10 bar gauge (barg) and a normalized rate of pressure rise (KST) of 165 bar-m/sec.49 The PMax data for all five dust samples listed in Table 3 were less than 10 barg. The obtained KST values for three of the dust samples were less than 165 bar-m/sec, but the KST values for the two Gilsonite dust samples were more than 165 bar-m/ sec (Table 3). The low MIE and higher KST values indicate that Gilsonite is a faster-burning dust that represents both a greater susceptibility to deflagration and a more demanding explosion protection system challenge than the specified KST value of 165 bar-m/s. 4.4. GO/NO-GO DUST EXPLOSIBILITY AND SPECIAL FLAMMABILITY TESTS The go/no-go dust explosibility screening test50 (using a residue sample from the duct) and the special sludge oil flammability test were conducted to determine whether the burning sludge observed in the duct stub above T-306 after the dust collector explosion also could be partially responsible for the second fireball and explosion. The go/no-go explosibility test result demonstrated that the residue powder was indeed explosible at dust concentrations of 100 grams per cubic meter (g/m3) and higher. The special sludge oil flammability test demonstrated that the burning sludge in the duct stub would not ignite the vapors in the tank itself if the tank liquid were at a temperature below its flash point, even if the burning sludge fell into the tank. On the basis of all the test results, the CSB concluded that the incident probably started with the self-heating and spontaneous ignition of the accumulated sludge (mostly Gilsonite and carbon black mixed with hydrocarbon oils) in the ductwork of the dust collection system. Transport of the burning sludge to the dust collector caused the dust collection explosion. The explosibility of the accumulated sludge and powder deposits in various sections of the duct combined with the flame propagation back from the dust collector explosion to cause more extensive residual burning in the various duct sections. Dust deposits in and around the ducting, including deposits produced from the dust collector explosion, dispersed as the US Ink employee climbed the stairs,51 intending to suppress the visible flame in the detached flexible duct above Tank 306. The residual flame ignited the dispersed dust, and the subsequent fireball dislodged and lifted more dust so that an expanding fireball vented through the doorway into the corridor. This expanding fireball (or flash fire) was responsible for the multiple burn injuries. 49 Engineers from US Ink provided Fike representatives with values for maximum rate of pressure rise (KST) for combustible materials used in the ink manufacturing process based on values that US Ink obtained from material suppliers. 50 The explosibility screening (go/no-go) test is used in the laboratory to determine whether a powder or dust will explode while in the form of a dust cloud when exposed to an ignition source. The test results for a material classify it as either a go type (explosible) or a no-go type (nonexplosible). Thus, the test is also known as the go/no-go test. 51 The dust dispersal may have been due to one of the following phenomena: (1) thermal failure of the flexible connection to T-306, (2) vibrations caused by the employee climbing the stairs, (3) initiation of the extinguisher discharge, or (4) sudden vaporization of a layer of condensed water vapor (produced by the burning sludge and dust) after the water dripped back into the tank and started sinking into the hot oil.

CSB • US Ink Case Study 20 US Ink Case Study Case Study January 2015 5.0 ENGINEERING DESIGN ANALYSIS CSB interviews with the US Ink design engineer, manufacturer, and distributor for the newly installed dust collection system revealed some design deficiencies. The CSB determined that improper design and operation of the new dust collection system were major contributing factors that led to the October 9, 2012, incident. The dust pickup points in the dust collection system pulled excessive quantities of dust and condensable vapors into the ductwork, which operated at low conveying velocities (as demonstrated by the quantities of accumulated dust found in the ductwork after operating the system for less than 2 days). This accumulation in the ductwork was the fuel for the primary deflagration that initiated the incident chain of events. Other design issues contributing to material accumulation, observed post-incident in the ductwork of the dust collection system, include the following (each discussed in more detail in a subsequent section, as noted): • Dust pickups at mix tanks that pulled air through the tank headspaces and extracted excessive quantities of condensable vapors and dust into the duct mains (Section 5.1) • Dust loading from housekeeping dust pickups with insufficient makeup air (Section 5.2) • Duct blockage because of failure to consider the effect of condensable vapors in the ductwork (Section 5.3) • Blockage of the Dust Collector Dust Fines Chute Because of Design Failure (Section 5.4) • Duct main blockage from low conveying velocity (Section 5.5) • Ineffective system checkup at commissioning of the dust collection system (Section 5.6) • Lack of system controlling parameters for operators to monitor performance and detect system degradation (Section 5.7) • Dust collection system that was not designed to prevent and contain fires or extinguish fires (Section 5.8) 5.1. MIXING TANK DUST PICKUPS THAT RELEASED VAPORS AND DUST INTO DUCT MAIN On the basis of analytical testing of the materials in the ductwork (summarized in Section 4), the CSB concluded that excessive quantities of condensable vapors were released into the ductwork of the dust collection system during its operation. An essential consideration in the design of a dust pickup of a dust collection system is how air enters the pickup and travels to the connected duct. In a closed system such as the mix tanks, air from the tanks is displaced when the tanks are filled with liquid or powders, and air must be drawn into the tanks as the liquid ink mixture is pumped out of the tank. At the US Ink East Rutherford facility, each of the three mixing tanks in the pre-mix room had a small air bleed duct (1.5 inches in diameter) on the rectangular powder fill chute from the carbon black delivery systems. Also attached was a flexible hose for delivering kaolin clay to the mixing tank. The tank was connected to the dust collection system through a flexible duct (6 inches in diameter) a few feet from the powder delivery chute (depicted in Figure 3). During operation of the mixing tanks and the dust collection system, air entering the tank through the 1.5-inch air bleed duct fluidized some of the powder in the chute on the way to the mixing tank during powder addition. Once in the tank, the air and some of the powder dust mixture traveled across the tank headspace, also picking up condensable vapors before exiting the tank in the flexible duct. The air volume admitted through a 1.5-inch duct is not

CSB • US Ink Case Study 21 US Ink Case Study Case Study January 2015 sufficient for an adequate conveying velocity52 in the 6-inch duct for dust, so only the finest particle sizes will continue moving. The CSB investigation revealed that the US Ink engineers initially had a design that would minimize high dust and condensable vapor loading of the dust collection system. However, the final design of the installed dust collection system did not avoid a continuous airflow through the tank headspace, which would discharge condensable vapors and dust mixture from each of the mixing tank headspaces into the moving air stream in the duct main. 5.2 DUST LOADING FROM HOUSEKEEPING DUST PICKUPS WITH INSUFFICIENT MAKEUP AIR The addition of three housekeeping hoses to the system contributed additional dust to the main ductwork, but not the makeup air needed to convey the additional dust to the dust collector. The three (1.5-inch) hoses were connected to the bottom of the adjacent mix tank ducts via enlargement to a hose 3 inches in diameter. The American Conference of Governmental Industrial Hygienists (ACGIH) Industrial Ventilation Manual (IVM) states, “All branches should enter the main at the center of the transition at an angle not to exceed 45° with 30° preferred in most cases (Figure 5-23).”53 In addition, ACGIH noted, “To minimize turbulence and possible particulate fall out, connections should be to the top or side of the main with no two branches entering at opposite sides.”54 The ductwork design for the US Ink dust collection system did not comply with this guideline. The 3-inch ducts were disassembled during the investigation; they were plugged with free- flowing dust, a sign of insufficient conveying velocity (as illustrated in Figure 9). The connection of housekeeping hoses to a dust collection system is not a good practice because the pressure drop required to move air at 4,000 feet per minute (ft/ min) in the 1.5-inch hose (1.5 to 2.0 inches of mercury or 20 to 27 inches of water column) is much greater than the available system static pressure of 17 inches of water column. In addition, doubling the duct diameter reduced the air velocity to less than 25 percent of that available in the hose, plugging the 3-inch duct in less than 2 days of operation. 52 Conveying velocity is the minimum air velocity required to move or transport particles within a duct system. It is measured in feet per minute (ft/min). 53 At the time of the incident, the 2007 edition of the IVM provided the applicable guidance; however, since then, ACGIH revised the guidance and published a 2013 edition of the IVM. 54 American Conference of Governmental Industrial Hygienists, Industrial Ventilation: A Manual of Recommended Practice for Design, 26th Edition (Cincinnati, OH: ACGIH, 2007) 5-27. FIGURE 9 Vacuum cleaning ducts, plugged after less than 2 days of operation

CSB • US Ink Case Study 22 US Ink Case Study Case Study January 2015 5.3 DUCT BLOCKAGE BECAUSE OF FAILURE TO CONSIDER EFFECT OF VAPORS AND DUST IN DUCTWORK The design of ductwork for the dust collection system did not reflect consideration of the presence of condensable vapor generated by the high temperature of the ink mixing process. US Ink did not make any provisions to prevent or clean out the uncontrolled condensation. The ACGIH IVM states, “If solid particulates or condensable vapors are being transported through the system, a minimum velocity is required.”55 The CSB concluded that the failure to consider the effect of condensable vapors in the design of the dust collection system led to formation of the sludge in the ductwork. In addition, the condensable vapors mixed with the dust, forming either a sludge in the duct or a cohesive dust in the dust collector. The CSB learned that the system volume capacity for the US Ink dust collection system was 3,300 actual cubic feet56 per minute (ACFM)57 at 210°F, while the design for 6-inch duct velocity indicated at an estimated airflow rate of 1,150 ft/min. On the basis of a review of the heavy or moist dust description in Table 5-1 of the ACGIH IVM,58 a minimum duct conveying or transport velocity of 4,500 ft/min would have been more appropriate for the design of the dust collection system at US Ink.59 The ACGIH IVM provides research data and information on the design, maintenance, and evaluation of industrial exhaust ventilation systems that are applicable to the US Ink dust collection system. A design minimum conveying velocity of 4,500 ft/min could have provided a more effective means of moving any moist dust within the dust collection system. US Ink did not provide any information or record that the engineers responsible for design and installation of the new dust collection system measured the dust conveying velocity of the system at commissioning. NFPA 654-2006,60 paragraph 7.6.1, states, “Ducts that handle combustible particulate solids shall conform to the requirements of NFPA 91.” NFPA 654 (2006 edition)61 and NFPA 91 (2010 edition)62 note the requirement, “All ductwork shall be sized to provide the air volume and air velocity necessary to keep the duct interior clean and free of residual material.” 55 American Conference of Governmental Industrial Hygienists, Industrial Ventilation: A Manual of Recommended Practice for Design, 26th Edition (Cincinnati, OH: ACGIH, 2007) 5-10. 56 An initial US Ink dust collection system design intent drawing allotted 500 cubic feet per minute (cfm) exhaust to each mix tank and 1000 cfm to the bag dump. Another 300 cfm was allotted for the three cleanup hoses. A later order confirmation placed the system volume capacity at 3,300 acfm at 210oF. 57 ACFM is a unit of volumetric capacity commonly used by manufacturers of blowers and compressors. This capacity is the actual gas delivery with reference to inlet conditions; it is the volume of gas (air) flowing anywhere in a system, independent of its density. 58 American Conference of Governmental Industrial Hygienists, Industrial Ventilation: A Manual of Recommended Practice for Design, 26th Edition (Cincinnati, OH: ACGIH, 2007) 5–11. 59 International Association of Plumbing and Mechanical Officials, Uniform Mechanical Code (Ontario, CA: IAPMO, 2009), Table 5-1, 46. 60 National Fire Protection Association, NFPA 654: Standard for the Prevention of Fire and Dust Explosions from the Manufacturing, Processing, and Handling of Combustible Particulate Solids, 2006 Edition (Quincy, MA: NFPA, 2006). 61 National Fire Protection Association, NFPA 654: Standard for the Prevention of Fire and Dust Explosions from the Manufacturing, Processing, and Handling of Combustible Particulate Solids, 2006 Edition (Quincy, MA: NFPA, 2006), 13. 62 National Fire Protection Association, NFPA 91: Standard for Exhaust Systems for Air Conveying of Vapors, Gases, Mists, and Noncombustible Particulate Solids, 2010 Edition (Quincy, MA: NFPA, 2010), 8.

CSB • US Ink Case Study 23 US Ink Case Study Case Study January 2015 5.4 BLOCKAGE OF THE DUST COLLECTOR DUST FINES CHUTE BECAUSE OF DESIGN FAILURE The dust collector dust hopper and dust fines chute were filled with approximately 322 pounds of dust fines in just 2 days of system operation. The 10-inch-diameter chute reduced to 4 inches in diameter to return the fines to the mix tank. The cohesive dust in the 10-inch- diameter chute bridged the opening and did not flow through the 4-inch chute. The dust chute design did not allow for the stop-and-start nature of dust fines return.63 If the incident had not halted operation of the process, the dust collector would have been plugged within a few more days of operation. 5.5 DUCT MAIN BLOCKAGE FROM LOW CONVEYING VELOCITY The duct main64 had insufficient conveying velocity until the three-way junction where the bag dump branch and the duct-mounted air bleed joined the duct from the three mix tanks and the housekeeping system pickups. The small 1.5-inch-diameter mix tank air bleeds would not admit enough air for conveying velocity in the 6-inch mix tank ducts or the 8-inch and 9-inch ducts with combined mix tank exhaust; this configuration created conditions in this section of the dust collection system that allowed the accumulation of condensable vapors and dust.65 As stated previously, locating the duct air bleed ahead of the first mix tank would have provided a makeup air source for a reliable conveying velocity in the duct main.66 5.6 INEFFECTIVE SYSTEM CHECKUP AT COMMISSIONING OF THE DUST COLLECTION SYSTEM Outside contractors performed all construction and installation of the new dust collector. Sun Chemical selected two contractors to configure the dust collection system, based on direction from the US Ink senior engineer. US Ink/Sun Chemical Corporation did not perform onsite risk and hazard assessments before start-up of the new dust collection system to determine the effectiveness of performance of the newly installed dust collection system. In addition, after contractors completed the dust collection system installation, no onsite inspection or measurement of system performance parameters (such as airflow rate and conveying velocity) was conducted to ensure that the system was working appropriately.67 No pitot tube68 holes were visible in the ducts, indicating that no system pressure measurements were taken at commissioning of the dust collection system. NFPA 91 and NFPA 654 require initial system testing, including measurement of all system branches to verify that the system delivers target airflows and to set the blast gates as necessary. 63 Very low conveying velocities in the ductwork, combined with air flow through the dust powder delivered in the chute, ended up putting dust and vapors into the duct but did not carry sufficient dust away through the recycle process and back into T-106. 64 The duct main is the section of the ductwork where other incoming duct branches join the main duct. 65 US Ink and its contractors responsible for the efficiency of the dust collection system performance did not perform any measurements to confirm the designed air flow rate and conveying velocity. 66 Bag dump and duct air bleeds should have been located at the far end of the duct to provide continuous airflow. 67 US Ink/Sun Chemical maintained that a US Ink contractor engineer performed a brief system start-up to ensure that everything was working properly. During that time, the suction of the dust collection system was checked. In addition, the conveying velocity was intended to be manually adjusted as production progressed, by use of the weighted damper, to ensure that the system was getting the right amount of suction. Although US Ink employees claimed there was too much suction (rather than too little), iterative testing of the process could not be performed to confirm actual flow rates as all the drops of dry materials had been completed for the day. Despite this argument by US Ink, the CSB asserts that visual observation of the suction rate by US Ink employees does not convey that a system start-up check or measurements were taken to quantify the performance and efficiency of the new dust collection system. 68 A pitot tube is an instrument used to measure air or fluid flow velocity under pressure. The basic pitot tube consists of a tube pointing directly into the air or fluid flow. Pressure can be measured based on the level of fluid in the tube.

CSB • US Ink Case Study 24 US Ink Case Study Case Study January 2015 Section 10.3.1 of NFPA 91 specifies the requirement, “When installation of a new system is complete, the system shall be tested to demonstrate performance before acceptance by the user.”69 Annex paragraph A.10.3 lists required system test activities, including: • Measure the air volume, fan static pressure,70 motor speed and electric current, and temperature of air in the system • Determine pressure drops across all components (such as air cleaning equipment) • Record the test data and design specifications • Compare the test data with design specifications and determine whether system alterations or adjustments are necessary to meet specifications71 The CSB concluded that US Ink/Sun Chemical Corporation did not perform any of the previously listed tests after installation of the US Ink dust collection system. The commissioning data are critical because they provide a reference point for ongoing system monitoring and maintenance to ensure that the dust collection system runs within design parameters. 5.7 LACK OF SYSTEM CONTROLLING PARAMETERS FOR OPERATORS TO MONITOR PERFORMANCE Dust collection system designs seek to overcome the anticipated flow resistance of the hoods, ducts, dust collector, auxiliary equipment, and exhaust stack. Many possible causes for anticipated resistance in these areas could affect system performance. For example, dust buildup in a duct reduces flow but increases local duct pressure between the dust collector and the plug; an increase in filter differential pressure restricts flow to the entire system, reducing hood exhaust airflow and hood static pressures. By knowing the pressure profile of different points in the system, as established with a newly commissioned system, operators can monitor changes in this information to enable timely interventions to keep the system working. Although the US Ink dust collection system had some remote indicators of differential pressures for the dust collector and the HEPA filter, none of the pressure gauges displayed action limit information, and no local static pressure devices near the mixing tanks or the bag dump hood warned the operator of performance problems, as recommended in the ACGIH manual, “Industrial Ventilation, A Recommended Practice for Operation and Maintenance.”72 69 National Fire Protection Association, NFPA 91: Standard for Exhaust Systems for Air Conveying of Vapors, Gases, Mists, and Noncombustible Particulate Solids, 2010 Edition (Quincy, MA: NFPA, 2010), 15. 70 Static pressure (SP) is defined as the pressure in the duct that tends to burst or collapse the duct and is expressed in inches of water gauge. It is usually measured with a water manometer, hence the units. SP can be positive or negative with respect to the local atmospheric pressure but must be measured perpendicular to the air flow. American Conference of Governmental Industrial Hygienists, Industrial Ventilation Manual, 28th Edition (Cincinnati, OH: ACGIH, 2013). 71 National Fire Protection Association, NFPA 91: Standard for Exhaust Systems for Air Conveying of Vapors, Gases, Mists, and Noncombustible Particulate Solids, 2010 Edition (Quincy, MA: NFPA, 2010), 18. 72 The ACGIH IVM recommends performing system testing at the time of initial installation (commissioning) to verify the volumetric flow rates and to obtain other information that can be compared with the original design data. Initial system testing is also necessary to provide a baseline for periodic maintenance checks. The ACGIH IVM recommends static pressure measurements and close visual inspections during maintenance checks if no alterations have been made to the system. American Conference of Governmental Industrial Hygienists, Industrial Ventilation: A Manual of Recommended Practice for Operation and Maintenance, 26th Edition (Cincinnati, OH: ACGIH, 2007), Chapter 2, “Commissioning and Proof of Performance.”

CSB • US Ink Case Study 25 US Ink Case Study Case Study January 2015 5.8 DUST COLLECTION SYSTEM NOT DESIGNED TO PREVENT, CONTAIN, OR EXTINGUISH FIRES US Ink employee testimonies revealed that the rubberized flexible hoses were the first part of the system to fail when the duct fire started. The US Ink mixing tanks had flexible hose lengths of 6 to 8 feet, which increased airflow restriction at the mixing tanks.73 The hose lengths of 8 to 10 feet at the bag dump station also added resistance to that branch. US Ink maintained that flexible ducts were used because the ink mixers were on weight scales. In addition, US Ink believed that the flexible ducts—constructed of Conduct-O-Flex, a material which had a conductive spiral core and was specifically intended (and used by US Ink) to prevent static buildup—were properly bounded and grounded to the rigid duct and mixer connections. The recommended best practice suggests using flexible duct only to aid mobility of moving parts or equipment and making lengths as short as possible (usually not more than 3 feet).74 In addition, rubberized flexible hoses are not electrically conductive because airborne powder moving through a plastic or rubberized hose can generate some static electrical charge. Combustible dust particles with a low MIE can ignite because of an electrostatic discharge from a nonconductive hose. The combustible flexible hoses used in the dust collection system design burned through rapidly and ultimately released the flash fire from the top of T-306 into the pre-mix room. The fire did not seriously damage any of the metal ducts, but all of the flexible hoses along the fire path suffered severe burns. A detailed examination of the US Ink dust collection system revealed the absence of duct cleanout doors. Duct cleanouts are commonly needed for dust collection systems as part of routine system monitoring and maintenance. The ACGIH IVM states, “Where the air contaminant includes particulate that may settle in the duct, clean-out doors should be provided in horizontal runs, near elbows, junctions, and vertical runs (see Figure 5-17).”75 Cleanout doors provide access to clean out accumulated dust and also serve as locations where firefighters can introduce water to fight fires. Because the US Ink facility had no cleanout doors,76 the East Rutherford firefighters had to break a section of ductwork to apply water to smoldering ductwork sections. The CSB inspection of the US Ink dust collection system indicated that ducts with cross- sections larger than 75 square inches (about 9.5 inches in diameter) did not have an automatic fire extinguishing system.77 Chapter 9 of NFPA 91 (2010 edition)78 specifies, “Any portion of an exhaust system utilizing combustible components or having the potential for combustible residue buildup on the inside, where the duct cross-sectional area is greater than or equal to 75 in2 (480 cm2), shall be provided with an automatic 73 The flexible hoses used in the dust collection system design were longer than needed and led to failure points during the incident. 74 National Fire Protection Association, NFPA 91: Standard for Exhaust Systems for Air Conveying of Vapors, Gases, Mists, and Noncombustible Particulate Solids, 2010 Edition (Quincy, MA: NFPA, 2010). This standard emphasizes the need to minimize the use of flexible hose, using it only for equipment that needs to move and then only in lengths as short as possible. 75 American Conference of Governmental Industrial Hygienists, Industrial Ventilation: A Manual of Recommended Practice for Design, 26th Edition (Cincinnati, OH: ACGIH, 2007), 5-27. 76 US Ink/Sun Chemical maintained that the dust collection system featured “easy-open” connections between pieces of the ductwork, which enabled easy inspection (and cleaning) of the ductwork interiors. US Ink believed that the easy-open connection was used in place of duct cleanout doors and as such served a similar purpose. Although the easy-open connection provided a reasonable alternative to the cleanout doors, firefighters could not use it to apply water to burning duct sections. 77 The ductwork assembly from section 6 (ductwork that was vertically installed from the pre-mix room up to the rooftop and continuing to the dust collector, as shown in Figure 8) was measured at 12 inches in diameter. 78 National Fire Protection Association, NFPA 91: Standard for Exhaust Systems for Air Conveying of Vapors, Gases, Mists, and Noncombustible Particulate Solids, 2010 Edition (Quincy, MA: NFPA, 2010), 15.

CSB • US Ink Case Study 26 US Ink Case Study Case Study January 2015 extinguishing system within the duct and at the duct intake, hood, enclosure, or canopy, or shall be constructed of material listed for use without sprinkler protection.”79 Although the Fike chemical suppression and isolation system attached to the dust collector stopped an explosion, it was not designed to extinguish fires, other than preventing backward flame propagation from the dust collector past the location of the chemical isolation device.80 In addition, incorporating sprinklers or some other extinguishing system in the 12-inch duct might have helped minimize duct damage on the day of the incident. Moreover, sprinklers are prudent for a dust collector protected by a chemical suppression system because an explosion suppression and isolation system is not designed to extinguish a fire in the ductwork or in the dust collector. CSB investigations revealed that US Ink engineers and the third-party loss prevention and risk management consultants (hired by US Ink/Sun Chemical Corporation) considered including internal sprinkler protection and explosion venting within the dust collector but ultimately decided against including sprinklers because of installation of the Fike explosion suppression and isolation system and because of cost- effectiveness factors. 6.0 SAFETY MANAGEMENT ANALYSIS The lack of adequate oversight by Sun Chemical Corporation management personnel in the planning, design, installation, and commissioning of the dust collection system likely contributed to the October 9, 2012, incident. The CSB identified significant management issues, including inadequate project oversight, ineffective employee training on the dust collection mechanism, and failure to develop and implement corrective actions from a previous incident. 6.1 INADEQUATE PROJECT OVERSIGHT Before design of the new dust collection system, the engineering team filed a Capital Appropriations/Asset Request (CAR),81 which contained various levels of approvals from the local plant, engineering department, local operations manager, division controller and accounting department, corporate environmental health and safety department, and CAR approval committee. Sun Chemical project management policy requires the CAR, which must be prepared if the total cost of a project exceeds $350,000. The estimate for the US Ink dust collection system exceeded $350,000 in capital costs; therefore, a CAR was required. In the CAR environmental health and safety section, a checkbox indicating the need for a process hazard analysis (PHA) or management of change (MOC) was not checked, indicating that neither a PHA nor a MOC was necessary for the dust collection system.82 During interviews with company engineers and senior management, CSB investigators 79 NFPA 91 is applicable to the incorporation of a sprinkler system in the ductwork design because it is a standard for exhaust systems for air conveying of vapors, gases, and mists (all generated from heating of ink ingredients and oils) and for noncombustible particulate solids (such as bentonite, used by US Ink). 80 Fike maintains that explosion suppression and chemical isolation device prevented backward flame propagation of a more rapid flame propagation speed at a pressure of 4.4 psig than was expected based on the predicted maximum pressure of 3.8 psig at the specified KST value of 165 bar-m/s. 81 The CAR system was designed so that Sun Chemical managers, engineers, and company decision-makers could approve projects electronically and so that information relating to the approval and rejection of a project could be saved for later reference. 82 The requirements for PHA and MOC procedures are described in: National Fire Protection Association, NFPA 654: Standard for the Prevention of Fire and Dust Explosions from the Manufacturing, Processing, and Handling of Combustible Particulate Solids, 2006 Edition (Quincy, MA: NFPA, 2006), Section 4.2 and Section 4.3.

CSB • US Ink Case Study 27 US Ink Case Study Case Study January 2015 learned that the engineering team considered installation of the dust collection system as a replacement in kind for the old wet scrubber system. The CSB investigation revealed that corporate engineering managers who were responsible for executing the US Ink dust collection system project at Sun Chemical relied on the judgments and decisions of their reports and did not adequately oversee the dust collection system project. The new dust collection system is completely different from the old wet scrubber system, with different functions and design specifications. US Ink/Sun Chemical management did not seek a building permit for a completely new process because they failed to acknowledge that a PHA was required for the new process.83 If a PHA had been conducted, it would have triggered consideration of additional safety factors, including the need to obtain a building permit. The CSB determined that, as a result, US Ink/Sun Chemical management provided inadequate oversight of the capital project. 6.2 INADEQUATE MANAGEMENT OF ORGANIZATION CHANGE AND CONTRACTOR OVERSIGHT A senior engineer who retired from US Ink before completion of the project coordinated the design of the dust collection system.84 Upon retirement of the senior engineer, another US Ink engineer and an engineering contractor assumed oversight of the dust collection project. Although not fully involved in initial design of the dust collection system, the new engineers completed contractor hiring and equipment ordering and oversaw installation of the dust collection system. There was no record of adequate communication of transitional knowledge concerning the handover of the dust collection system from the retired senior engineer to the new engineers. External contractors (who were not fully involved in the design concept of the dust collection system) performed all construction and installation activities for the new dust collection system. The engineers communicated primarily by telephone and emails to the subcontractors, without observing the actual installation process for the dust collection system. CSB interviews with the US Ink engineers revealed that US Ink/Sun Chemical Corporation lacked an adequate and effective process for management of organizational change. No procedures allowed for transferring and retaining design knowledge and forwarding information to the new engineer. In this case, the company relied on the retired senior engineer solely for technical guidance throughout the design, construction, and installation phases of the dust collection system. When the original design engineer left, accountability for the dust collection system fell to the new engineer, who was not directly involved in the initial design of the dust collection system, and to the in-house contractor engineer, who made frequent trips to the East Rutherford facility to observe progress on the installation process for the dust collection system. However, US Ink/Sun Chemical claimed to rely on the expertise of the manufacturers of the dust collection system and on their contractors for smooth operation of the system. As a result, US Ink/Sun Chemical did not provide additional contractor oversight for the dust collection project. In addition, the new engineer did not consult other company engineers who could support the design, installation, and commissioning of the dust collection system. 83 The US Ink East Rutherford facility was not covered by OSHA process hazard management (PHM). However, NFPA 654 (2006 edition) requires that a combustible dust hazard assessment must be conducted and used as the basis for choices in fire and explosion protection systems. In addition, conducting an assessment of the major deficiency areas of the dust collection system would have at least triggered the need for PHA. 84 Contractors and manufacturers that specialized in dust collection systems fabricated and installed the dust collection system.

CSB • US Ink Case Study 28 US Ink Case Study Case Study January 2015 6.3 INEFFECTIVE HAZARD COMMUNICATION AND EMERGENCY RESPONSE PLANNING Employee injuries likely would have been prevented if US Ink had developed and implemented an effective hazard communication and emergency response plan. US Ink fire and explosion emergency procedures called for a designated chief coordinator to use the public address system to announce the fire and its location as soon as it was observed. The designee also had the task of pulling the alarm box outside the main office and calling the fire department. The plant evacuation plan required all employees to evacuate the building immediately after the fire alarm was pulled. On the day of the incident, the designated fire coordinator did not perform any of the duties (announcing the fire or pulling the alarm box) because he was among those injured while assembled at the entrance to the pre-mix room. Although the pre-mix room operator informed the designee about the first flash fire from the bag dump station, the employee decided to go to the pre-mix room to observe the situation instead of performing his duties as the plant-designated fire coordinator. In addition, the US Ink hazard communication and emergency response plan did not require that an employee attempt to control a fire with an extinguisher after a manually triggered fire alarm was actuated; rather, the plan required employees to evacuate the building immediately. Because no fire alarm sounded, employees attempted to extinguish the fire. Although all employees eventually evacuated the building, the evacuation did not occur until after the injuries were sustained. Witness interviews revealed that although the company occasionally conducted training and fire drills, employees did not follow the existing emergency response plan on the day of the incident.85 This circumstance indicated that the fire hazard and emergency training received by plant employees was inadequate. The sprinkler system in the pre-mix room was connected to an automatic audible alarm that was relayed to the East Rutherford Fire Department, but no record indicated that the automatic fire alarm provided adequate (if any) notification to employees. The CSB observed that no other automatic fire alarm system was located anywhere in the US Ink East Rutherford facility. An effective automatic fire alarm would have immediately notified employees of the flash fires and triggered an immediate evacuation; instead, employees congregated at the entrance of the pre-mix room. The manual alarm notification system that US Ink adopted was ineffective on the day of the incident. NFPA 72 (National Fire Alarm Code, 2007 edition86) specifies requirements for the installation and operation of automatic fire alarms and other fire detection systems, including audible and visible fire emergency notification systems. 6.4 INEFFECTIVE EMPLOYEE TRAINING ON DUST COLLECTION MECHANISM After initial start-up of the dust collector, a 15-minute meeting was held on October 5, 2012, for supervisors and one of the day-shift operators87 and was less than adequate. At the meeting, the system manufacturer provided a walkthrough of the dust collection system and a brief interpretation of visual indicators. The meeting did not include information on how the dust collection system was designed to work and how operators could troubleshoot problems. This limited training did not adequately prepare the staff to address a malfunction of the dust collection system. In addition, US Ink did not develop a fire or 85 The CSB review of records for fire safety training and drills indicated that the hazards of combustible dust explosions were communicated to the employees; US Ink employees followed the “pre-planned” annual drills; and seven employees were injured on the day of the incident as a result of the failure to follow the hazard communication procedures outlined in the training and fire drills. 86 National Fire Protection Association, NFPA 72: National Fire Alarm and Signaling Code, 2007 Edition (Quincy, MA: NFPA, 2007). 87 The night-shift pre-mix room operator did not receive the 15-minute walkthrough and instructions.

CSB • US Ink Case Study 29 US Ink Case Study Case Study January 2015 explosion incident prevention program to reinforce employee understanding of the potential hazard severity associated with the newly installed dust collection system. Moreover, no mechanism was in place for pre-mix room operators to determine changes in dust collection system performance. 6.5 FAILURE TO DEVELOP AND IMPLEMENT CORRECTIVE ACTIONS RESULTING FROM A PREVIOUS INCIDENT Before October 9, 2012, a similar fire incident involving a mixing tank occurred at the US Ink East Rutherford facility on February 29, 2008, when the East Rutherford Bureau of Fire Safety and the East Rutherford Fire Department responded to a fire incident at the US Ink facility. The fire occurred in an ink mixing tank (about 80 percent oil and 20 percent carbon black). According to the East Rutherford Bureau of Fire Safety, the fire occurred because of overheating of ingredients in the mixing tank. The official report documenting the emergency response indicated that the ductwork at the top of the tank was consumed by the flames generated during the fire. An employee initially attempted to suppress the fire with a fire extinguisher but, after failing to do so, exited the building.88 The US Ink security service company notified the East Rutherford Fire Department, and responding units extinguished the fire. No injuries were reported as a result of this previous incident. US Ink did not address any lessons learned from this incident. It did not discourage employees from attempting to extinguish fires in an environment with flammable vapor and combustible dust. In addition, the company did not install temperature indicators and temperature interlocks that would activate when the temperature from the ink mixing operation became too high. 7.0 REGULATORY ANALYSIS 7.1 U.S. OCCUPATIONAL SAFETY AND HEALTH ADMINISTRATION 7.1.1 Combustible Dust Standard The CSB has investigated multiple combustible dust incidents since 2003. The agency initiated a study of dust explosions in general industry after three catastrophic incidents in one year, and it issued the Combustible Dust Hazard Study in 2006. This CSB study identified 281 combustible dust incidents between 1980 and 2005, which led to the deaths of 119 workers, injured 718, and extensively damaged numerous industrial facilities.89 The need to control the risk of dust explosions in general industry became apparent, and as a result, the Board issued six recommendations; one advocated a new federal OSHA standard based on existing NFPA standards for combustible dust. The CSB study found that a comprehensive federal regulation specific to combustible dust was necessary because the reliance on industry to voluntarily comply with consensus standards, fire codes, or both was insufficient to control combustible dust hazards. US Ink 88 The US Ink hazard communication and emergency response plan did not require an employee to try to control a fire with an extinguisher but instead required employees to evacuate the building immediately when a fire alarm sounded. Industry best practices discourage employees from attempting to extinguish fires in a combustible dust environment because this approach could be deadly. 89 U.S. Chemical Safety and Hazard Investigation Board, Final Report: Combustible Dust Hazard Study, Investigation Report No. 2006-H-1 (Washington, DC: CSB, 2006) (http://www.csb.gov/combustible-dust-hazard-investigation/ and http://www.csb.gov/assets/1/19/Dust_Final_Report_Web- site_11-17-06.pdf).

CSB • US Ink Case Study 30 US Ink Case Study Case Study January 2015 did not consistently follow NFPA-prescribed design requirements or ACGIH standards when designing its new dust collection system (discussed in Section 5). Moreover, OSHA enforcement of existing regulations failed to address dust hazards. OSHA initially cited US Ink and fined it $25,000 for the October 9, 2012, incident, characterizing the accident as a dust explosion. The citations included violations of OSHA standards for exit routes, storage and handling of liquefied petroleum gases, portable fire extinguishers, and hazard communication. However, many of the listed violations were not causally linked to the flash fire that burned the seven workers. Consequently, US Ink corrective actions to address those violations would not prevent or mitigate the risk of a future combustible dust incident. OSHA inspectors need a comprehensive standard to regulate the design and operation issues of processes involving combustible dust to effectively prevent combustible dust incidents. Since 2006, the CSB has continued to investigate catastrophic combustible dust incidents in all types of industries. For example, just 2 years after the CSB issued its study, an explosion of sugar dust at the Imperial Sugar Company manufacturing and packaging facility in Port Wentworth, Georgia, killed 14 workers and injured 38 others. In 2010, an explosion involving titanium dust ripped through the AL Solutions, Inc., processing facility for titanium and zirconium scrap metal in New Cumberland, West Virginia, killing three workers and injuring one. Just over a year before the US Ink incident, the CSB investigated three iron dust incidents at the Hoeganaes Corporation steel and iron powder manufacturing facility in Gallatin, Tennessee, that killed five workers and injured three others in 2011. The findings from these investigations reinforced the CSB 2006 study findings and led to reiteration of the CSB recommendation to OSHA to issue a combustible dust standard and to do so promptly. The CSB also has been tracking combustible dust incidents, documenting 50 accidents involving combustible dust that caused 29 fatalities and 161 injuries from 2008 to 2012.90 To date, OSHA has not promulgated a combustible dust standard, although it has started the rulemaking process. In 2009, OSHA published an Advance Notice of Proposed Rulemaking (ANPR) for combustible dust that defines the hazard as “all combustible particulate solids of any size, shape, or chemical composition that could present a fire or deflagration hazard when suspended in air or other oxidizing medium.” US Ink carbon black and Gilsonite powders are characterized as “combustible” according to Material Safety Data Sheets (MSDSs) and therefore would be covered by this proposed rule. Although the agency has continued to place the combustible dust rule on its regulatory agendas over the years, OSHA has not moved forward in rulemaking. As a result, the CSB held a public meeting in Washington, DC, on July 25, 2013, declaring OSHA actions “unacceptable” because of the delay in issuing a combustible dust standard, and the CSB also placed the issue of combustible dust on its Most Wanted Chemical Safety Improvement Program list.91 90 U.S. Chemical Safety and Hazard Investigation Board, Final Report: AL Solutions, Investigation Report No. 20011-3-I-WV (Washington, DC: CSB, 2011), Appendix C (http://www.csb.gov/assets/1/19/Final_Case_Study_7.161.pdf, accessed August 13, 2014). 91 U.S. Chemical Safety and Hazard Investigation Board, U.S. Chemical Safety Board Determines OSHA Response to Seven Open CSB Recom- mendations on Dust, Fuel Gas, and Process Safety Management to Be “Unacceptable”; Board Votes to Designate a Combustible Dust Standard as “Most Wanted” (Washington, DC: CSB, 2013) (http://www.csb.gov/us-chemical-safety-board-determines-osha-response-to-seven-open-csb- recommendations-on-dust-fuel-gas-and-process-safety-management-to-be-unacceptable/). Also: U.S. Chemical Safety and Hazard Investigation Board, U.S. Chemical Safety and Hazard Investigation Board Recommendations Status Change Summary (Washington, DC: CSB, 2013) (http:// www.csb.gov/assets/recommendation/Status_Change_Summary_Dust.pdf, accessed August 12, 2014).

CSB • US Ink Case Study 31 US Ink Case Study Case Study January 2015 OSHA does recognize that regulating combustible dust will prevent these accidents. Previous OSHA experience in regulating dust explosions in the grain industry proved that the number and severity of grain dust explosions decreased after promulgation of the Grain Handling Facilities Standard in 1987. During a 2003 regulatory review of the standard, OSHA found that grain explosions had declined by 42 percent, injuries by 60 percent, and fatalities by 70 percent.92 Furthermore, recent OSHA inspection data indicated that inspectors were using the general duty clause (GDC) almost seven times more often for citations related to combustible dust than for all other citations. Inspectors use the GDC when no specific standard applies to a recognized hazard. OSHA found that the most common GDC violations for dust hazards cited equipment that was not adequately equipped to prevent excessive dust accumulations, failure to effectively protect systems to prevent a dust explosion or deflagration, and failure to reduce ignition sources in the presence of dust. These hazards are addressed in consensus standards, which inspectors referenced when using the GDC. OSHA concluded that the “unusually high proportion” of GDC citations supported the need for a comprehensive OSHA combustible dust standard.93 7.1.2 OSHA Combustible Dust Education and Enforcement Efforts Since the release of the CSB 2006 study, OSHA has made efforts to educate employers who might have combustible dust hazards. On its website, OSHA created a resource page (“Combustible Dust: An Explosion Hazard”) that includes guidance for workers and emergency responders on precautions to take when handling or responding to incidents involving combustible dust.94 OSHA also has increased its enforcement actions, moving toward identifying and correcting combustible dust hazards as a result of some of the CSB recommendations from the 2006 study. In October 2009, OSHA reported training more than 350 compliance officers on combustible dust and developed other training courses that both federal OSHA and state personnel have attended since December 2007.95 OSHA also initiated the Combustible Dust National Emphasis Program (NEP) in 2007, an inspection program to target specific industry hazards during a specified time period. OSHA reissued the Combustible Dust NEP in 2008 after the Imperial Sugar accident to intensify enforcement activities for facilities that have combustible dust hazards. States that fall under federal jurisdiction, such as New Jersey, are required to inspect in accordance with the Combustible Dust NEP. Each OSHA Area Office receives a list of establishments in that geographical region with North American Industry Classification System (NAICS) codes that correspond to industry sectors identified by OSHA as “industries with more 92 “Regulatory Review of OSHA’s Grain Handling Facilities Standard,” 29 Code of Federal Regulations (CFR) 1910.272, February 2003 (https://www. osha.gov/dea/lookback/grainhandlingfinalreport.html, accessed August 13, 2014). 93 U.S. Occupational Safety and Health Administration, Advance Notice of Proposed Rulemaking, 29 CFR Part 1910, “Combustible Dust: Proposed Rule,” 74 Federal Register (FR) 22, October 21, 2009. 94 U.S. Occupational Safety and Health Administration, Combustible Dust: An Explosion Hazard (https://www.osha.gov/dsg/combustibledust/ enforcement.html, accessed August 13, 2014). 95 U.S. Occupational Safety and Health Administration, Status Report on Combustible Dust National Emphasis Program, October 2009 (https:// www.osha.gov/dep/combustible_dust/combustible_dust_nep_rpt_102009.html, accessed August 14, 2014).

CSB • US Ink Case Study 32 US Ink Case Study Case Study January 2015 frequent and/or high consequence combustible dust explosions/fires” (as listed in Appendix D-1 of the Combustible Dust NEP directive) or to industries “that may have potential for combustible dust explosions/fires” (as listed in Appendix D-2 of the Combustible Dust NEP directive). On the basis of its familiarity with local industries, the OSHA Area Office can make appropriate additions or deletions. Random number selection is then used to identify facilities where the area office will conduct programmed Combustible Dust NEP inspections in a given fiscal year. Each OSHA Area Office must conduct at least three inspections per year at establishments with NAICS codes that appear in Appendix D-1 of the Combustible Dust NEP directive and at least one inspection per year at establishments with NAICS codes that appear in Appendix D-2. The NAICS code assigned to the US Ink Facility (325910, Printing Ink Manufacturing) does not appear on either the Appendix D-1 list or the Appendix D-2 list of the OSHA Combustible Dust NEP directive. This NEP even identifies Class II locations as hazardous sites with the presence of certain substances, such as “carbonaceous dust” (i.e., carbon black).96 The OSHA Region II Area Office did not use its discretionary authority to add the U.S. Ink facility to either list. Therefore, the facility was never subjected to a programmed inspection under the Combustible Dust NEP. Moreover, as previously mentioned, no dust-related citations resulted from the US Ink inspection after the October 9, 2012, incident, although the incident was characterized as a dust explosion.97 The Combustible Dust NEP requires an inspection in accordance with its guidelines after an accident involving combustible dust and provides guidance on citations, noting, “A citation under section 5(a)(1) of the OSH Act (the general duty clause) may be issued for deflagration, explosion or other fire hazards that may be caused by combustible dust within a dust collection system or other containers, such as mixers.”98 No such citation was issued to US Ink, calling into question how effectively the Combustible Dust NEP and training on combustible dust are communicated to OSHA local area offices. 7.1.3 National Impact of the NAICS Code The latest U.S. Census data show that the total number of establishments99 in the United States with NAICS Code 325910 (Printing Ink Manufacturing) is 429, with 11,488 paid employees. Of these sites, 5 percent are in New Jersey100 and employ 364 workers.101 Because no comprehensive OSHA standard regulates the hazards of combustible dust in general industry, many of these employees remain at risk of a combustible dust explosion and fire at their workplaces. 96 U.S. Occupational Safety and Health Administration, Combustible Dust National Emphasis Program (Reissued), CPL 03-00-0008 (Washington, DC: OSHA, 2008). 97 OSHA Inspection Detail, October 9, 2012, “Sun Chemical Inc. Inspection No. 704178.015” (https://www.osha.gov/pls/imis/establishment.inspection_ detail?id=704178.015, accessed November 21, 2014). 98 OSHA Instruction, “Combustible Dust National Emphasis Program (Reissued),” March 11, 2008 (https://www.osha.gov/pls/oshaweb/owadisp. show_document?p_table=directives&p_id=3830#purpose, accessed November 21, 2014). 99 Establishment is defined as “a single physical location where business is conducted or where services or industrial operations are performed” (https://www.census.gov/econ/susb/definitions.html, accessed August 15, 2014). 100 New Jersey has a total of 25 establishments under NAICS Code 325910. 101 U.S. Census Bureau, Statistics of U.S. Businesses, 2011 Annual Data (http://www.census.gov/econ/susb/data/download_susb2011.html, accessed August 15, 2014).

CSB • US Ink Case Study 33 US Ink Case Study Case Study January 2015 7.2 STATE OF NEW JERSEY 7.2.1 New Jersey State Uniform Construction Code Act In 1975, the New Jersey state legislature enacted the State Uniform Construction Code (UCC) Act, which is administered by the Department of Community Affairs (DCA), the primary agency in the state for building codes and standards. This act provided for a single mandatory construction code and for a fundamental restructuring of the enforcement process. Hence, the UCC—that is, New Jersey Administrative Code (N.J.A.C.) 5:23, et seq.—was adopted and became effective on January 1, 1977.102 Under the current New Jersey UCC, a number of subcodes have been adopted, such as the International Building Code (IBC) (2009 edition) and the National Electric Code (2011 edition). The New Jersey UCC mandates that any installation of new equipment requires the owner to file an application for a construction permit, which involves various building permits for electrical, fire, and plumbing.103 A permit application leads to an inspection by the local building authority and ensures that appropriate codes (e.g., building, electrical, plumbing, and fire codes) are followed. The CSB found that US Ink did not submit an inquiry to the local building department, the East Rutherford Building Department, to determine whether a construction permit for the new dust collection system was necessary. Therefore, US Ink never applied for a building permit, and as a result, the building department did not inspect the new dust collection system before the incident. The CSB found that US Ink did not apply for the permit because it thought an exemption applied under the New Jersey UCC, which excludes “manufacturing, production and process equipment.” Equipment covered under the exemption is defined as “all equipment employed in a system of operations for the explicit purpose of the production of a product” and lists “air pollution equipment, such as scrubbers” as the type of equipment that is exempted.104 US Ink applied this exemption to its dust collection system because it considered the system as “air pollution equipment” connected to the manufacturing process, capturing raw materials and recycling them back into the pre-mix room to produce the final ink product. However, although the New Jersey UCC did not regulate the dust collection equipment at US Ink, the new structural and electrical changes involved in installing the new dust collection system still required US Ink to file for a construction permit. The New Jersey UCC states that it is unlawful to “repair, renovate, alter, reconstruct or demolish a structure…without first filing an application with the construction officials.”105 A 1992 New Jersey Register notice explains: Highly specialized, often preassembled equipment designed for commercial or industrial use, manufacturing, production and process equipment, or “process equipment,” is often unique to its function and designed beyond the referenced standards in the UCC. This makes it impractical or impossible for code officials to review it in an appropriate way. They do, however, review electrical, water, and sanitary connections to such process equipment, as these can affect public safety.106 102 Bureau of Construction Project Review website (http://www.state.nj.us/dca/divisions/codes/offices/constructionprojectreview.html, accessed September 5, 2014). 103 N.J.A.C. 5:23-2.14. 104 N.J.A.C. 5:23-2.2(a)1. 105 N.J.A.C. 5:23-2.14(a). 106 New Jersey Register 24:19 (October 5, 1992), 4.

CSB • US Ink Case Study 34 US Ink Case Study Case Study January 2015 This notice explains the intent of the exemption, to relieve code officials from inspecting the function and design of such equipment when the New Jersey UCC at the time referenced no standards on which to base their enforcement. However, the connections or structural building changes associated with that equipment still require a permit. Consequently, the East Rutherford Building Department cited the company after the October 2012 incident for not obtaining a construction permit.107 Nevertheless, if the construction permit had been obtained, it would only have required the East Rutherford facility to comply with structural and electrical code requirements. The New Jersey UCC would not have covered the design of the dust collection equipment because of the existing exemption for “manufacturing, production and process equipment.” New Jersey exempted that equipment because of the lack of referenced standards in the UCC to assist code officials. However, once New Jersey adopted the IBC,108 which includes engineering and fire protection standards set by consensus organizations such as the NFPA, the explanation from the 1992 New Jersey Register notice was no longer valid. In New Jersey, no current building or fire standards have jurisdiction over the design of the dust collection system at US Ink. The company received environmental permits for its dust collection system before installation.109 The New Jersey environmental standards, however, only set minimum emission standards to control pollution rather than safety requirements to prevent a fire and explosion. If the dust collection equipment had been covered by the current New Jersey UCC, US Ink would have been required to follow the IBC (2009), which requires occupancies handling combustible dust (such as carbon black) to comply with fire protection standards such as NFPA 654,110 which US Ink did not apply appropriately in the design of the dust collection system (discussed in Section 5). The IBC defines H-2 occupancies as “buildings and structures containing materials that pose a deflagration hazard or a hazard from accelerated burning” and lists combustible dusts as a type of such material. Combustible dust in the code is defined as “finely divided solid material that is 420 microns or less in diameter and which, when dispersed in air in the proper proportions, could be ignited by a flame, spark or other source of ignition.” According to its MSDS, the carbon black at US Ink met this definition. Under these provisions, US Ink would be required to have a licensed professional develop and present the engineering drawings to be submitted as part of the permit application.111 The licensed engineer who coordinated the design of the dust collection system for US Ink likely would have evaluated the drawings to ensure compliance with IBC (2009) requirements. In the absence of a federal combustible dust standard, states must rely on their own regulations. New Jersey code officials would need authority under the New Jersey UCC to enforce provisions that oversee the design of dust collection equipment, which would 107 “Notice and Order of Penalty, US Ink Corp/Sun Chemical Corporation,” February 20, 2014. 108 New Jersey first adopted the IBC in 2003 and adopted more recent revisions over the years; the last edition was adopted in 2010. New Jersey model code adoptions are summarized on the website (http://www.state.nj.us/dca/divisions/codes/codreg/pdf_regs_former/nj_model_code_ adopt_5_7_12.pdf). 109 US Ink Preconstruction Air Permit, Operating Certificate PCP100002. 110 International Code Council, International Building Code, 2009 Edition (Country Club Hills, IL: ICC, 2009), Chapter 4, “Special Detailed Requirements Based on Use and Occupancy,” Section 415.6.1. 111 N.J.A.C. 5:23-2.15.

CSB • US Ink Case Study 35 US Ink Case Study Case Study January 2015 require a revision of the UCC. Such revisions are needed to require companies in New Jersey that use such equipment (such as US Ink) to follow minimum design standards intended to protect workers and the public. The New Jersey DCA promulgates New Jersey UCC regulations112 and also provides administrative guidance and technical assistance to local departments in the state. Specifically, the DCA provides training113 and licensing to building code officials throughout the state, administered by the Bureau of Code Services, Division of Codes and Standards.114 Additional training on engineering design standards for processes involving combustible dust will be needed for local building code officials if their authority is expanded to inspect this type of process equipment. Furthermore, training is needed to ensure that facilities handling combustible dusts receive the appropriate occupancy classification. US Ink was not accurately classified as an H-2 occupancy that handled combustible dust. The initial building permit identified the US Ink facility as an F-1 and S-1, which are for factory and storage occupancies. However, according to the IBC, F and S occupancies are not required to follow NFPA standards for combustible dust hazards. The DCA should provide training to local building officials on hazardous materials, such as combustible dusts, to ensure that the correct classification is assigned and appropriate building requirements are followed. 8.0 KEY FINDINGS As a result of the US Ink investigation, the CSB makes the following findings:

  1. A flammable mixture consisting of hydrocarbons and combustible dusts

accumulated in the ductwork during the start up of US Ink’s dust collection system. The mixture spontaneously ignited leading to a series of events that caused a flash fire, burning 7 workers. US Ink/Sun Chemical Corporation did not obtain building, fire, or electrical permits for the construction and installation of the new dust collector. In addition, the East Rutherford Building Department does not have a strict permit, code notification, and enforcement process to ensure compliance with the New Jersey UCC.

  1. The original design of the dust collection system was intended strictly for dust

collection but was modified before commissioning to include a housekeeping function. This also caused insufficient flow rate and contributed to an accumulation of a flammable mixture in the duct system. Although the design, construction, and installation of the new dust collector required capital project approval at the corporate level, US Ink/Sun Chemical Corporation did not provide adequate oversight of, and communications (including discussions on the possible implications of the presence of vapors from heated combustible liquids) with, contractors for the dust collection system project. 112 N.J.A.C. 5:23-1.2. 113 DCA provides training on NFPA codes. 114 N.J.A.C. 5:23-5.2.

CSB • US Ink Case Study 36 US Ink Case Study Case Study January 2015

  1. System controls, such as temperature and pressure indicators, were not installed for

operators to monitor the mixing tanks and dust collection system during start up. This led to the overheating of the flammable dust mixture which accumulated in the ductwork, and ignited above T-306. The mix tank dust pickup design, which continuously drew air through powder and vapor in the tank headspace, led to the accumulation of dust and condensable vapor in sections where other duct branches joined the main ductwork (duct main), providing fuel for the duct fire that initiated the sequence of events.

  1. US Ink/Sun Chemical Corporation did not provide adequate oversight into the

planning, design, installation and commission of the dust collection system. As a result, safety management elements such as a Process Hazard Analysis and Management of Change procedures were not conducted. The original design of the dust collection system was intended strictly for dust collection but was modified before commissioning to include a vacuum cleaning function, with insufficient flow rate that restricted air movement and contributed to an accumulation of hazardous materials in the duct system.

  1. No processes were in place to confirm adequate start up or commissioning of the

dust collection system. As a result, the blockage of the ductwork went undetected and design flaws were not revealed until after the flash fire occurred. The dust collection system design did not ensure adequate minimum conveying velocity in all dust branches, resulting in plugged ducts and a deposited mixture of carbon black, Gilsonite, clay, and oil within a few days of start-up and accumulating dust fuel in the ducts for the resulting fire. In addition, the use of combustible rubber hoses for ducts and powder chutes contributed to the duct fire and explosion.

  1. US Ink’s hazard communication, emergency response plan, and other incident

prevention programs did not reinforce an understanding of the potential hazard associated with flammable vapors entering the dust collection system and mixing with the combustible dust. No local temperature and pressure indicator monitored the mixing tanks and dust collection system. This situation likely led to the mixing temperature exceeding safe limits by a margin sufficient to cause the already self- heated vapors of oil and ink dust powder to ignite the accumulated materials in the ductwork above T-306.

  1. US Ink/Sun Chemical Corporation did not obtain construction permits for the

installation of the new dust collection system. Because of the lack of adequate commissioning or confirmation of adequate performance at start-up, the design flaws were not revealed until the dust explosion. In addition, the dust collection system was not systematically monitored and maintained; no processes were in place to detect the duct plugging that occurred.

  1. No federal agency or state agency in New Jersey regulates combustible dust hazards.

The hazard communication and emergency response plan and other incident prevention programs did not reinforce an understanding of the potential hazard severity associated with dust produced by the new dust collection system. For example, no automatic fire alarm system was in place in the other areas of the pre-mix room, as required by NFPA 72.

CSB • US Ink Case Study 37 US Ink Case Study Case Study January 2015

  1. A comprehensive OSHA federal regulation specific to combustible dust is needed

because the reliance on industry to voluntarily comply with fire protection and engineering standards is insufficient to control combustible dust hazards. The New Jersey DCA conducts training for internal personnel and local building code officials on some of the NFPA standards in the New Jersey UCC but does not provide training on combustible dust hazards or relevant NFPA standards that address combustible dust.

  1. OSHA did not include the NAICS code for printing ink manufacturing

(325910), the industry classification code for US Ink, to its list of industries in the Combustible Dust NEP. OSHA inspectors refer to this list as guidance on inspections for combustible dust hazards in their region. A comprehensive federal regulation specific to combustible dust is necessary because the reliance on industry to voluntarily comply with consensus standards and fire codes is insufficient to control combustible dust hazards. OSHA did not include printing ink manufacturing (NAICS Code 325910), the industry classification code for US Ink, in its Combustible Dust NEP when it was issued in 2007 or reissued in 2008.

  1. The New Jersey Uniform Construction Code (UCC) adopts the International

Building Code, which does reference fire protection and engineering standards for facilities that handle combustible dusts, such as NFPA 654. However, the UCC exempts certain process equipment that could apply these provisions.

  1. The New Jersey Department of Community Affairs conducts training for local

building code officials on some of the NFPA standards in the New Jersey UCC but does not provide training on relevant NFPA standards that address combustible dust hazards. 9.0 REITERATED RECOMMENDATION U.S. OCCUPATIONAL SAFETY AND HEALTH ADMINISTRATION The absence of a general industry safety standard for combustible dust remains an important safety issue because catastrophic dust incidents continue to occur throughout industry. Therefore, the CSB reiterates the recommendation originally issued to OSHA in the 2006 Combustible Dust Hazard Study. 2006-01-I-H R1    Issue a standard designed to prevent combustible dust fires and explosions in general industry. Base the standard on current National Fire Protection Association (NFPA) dust explosion standards (including NFPA 654 and NFPA 484) and include at least the following: • Hazard assessment • Engineering controls • Housekeeping • Building design • Explosion protection • Operating procedures • Worker training

CSB • US Ink Case Study 38 US Ink Case Study Case Study January 2015 10.0 RECOMMENDATIONS As a result of its investigation of this accident at the US Ink facility, the CSB makes a number of safety recommendations. U.S. OCCUPATIONAL SAFETY AND HEALTH ADMINISTRATION 2013-01-I-NJ R1    Add North American Industry Classification System (NAICS) Code 325910, Printing Ink Manufacturing, to the list of industries in Appendix D-1 or Appendix D-2 of Combustible Dust National Emphasis Program (NEP), Directive CPL 03-00-008. 2013-01-I-NJ R2    Communicate with all OSHA Area Offices to encourage appropriate application of the following existing provisions of the Combustible Dust NEP, Directive CPL 03-00-008: • Paragraph IX, Section A2, indicates that area offices may add to their Combustible Dust NEP establishment lists those facilities in their jurisdictions with a Standard Industrial Classification System code, NAICS code, or both (other than those listed in Appendices D-1 and D-2 of the Combustible Dust NEP directive) if those facilities have a known pattern of combustible dust hazards. • Paragraph IX, Section B4, indicates that if a fatality or catastrophe investigation is performed at a facility because of a combustible dust deflagration or explosion, the inspector shall use the guidelines in Fatality/Catastrophe Investigation Procedures, Directive CPL 02-00-137, and in the Combustible Dust NEP, Directive CPL 03-00-008. NEW JERSEY DEPARTMENT OF COMMUNITY AFFAIRS 2013-01-I-NJ R3    Revise the exemption for “manufacturing, production, and process equipment” under the New Jersey Uniform Construction Code (N.J.A.C 5:23-2.2) to require that equipment involved in processing, handling, or conveying combustible dust comply with the design and operating requirements of the current edition of the International Building Code. 2013-01-I-NJ R4    Develop and implement training for local code officials on the National Fire Protection Association (NFPA) standards referenced in the New Jersey adoption of the International Building Code (IBC) for occupancies with a high hazard classification (Group H); specifically, include training on equipment that handles combustible dust and the hazards involved. 2013-01-I-NJ R5    Promulgate a regulation that requires all occupancies handling hazardous materials to inform the local enforcement agency of any type of construction or installation of equipment at an industrial or manufacturing facility. Also require local enforcement agencies to evaluate the information to determine whether a construction permit is required.

CSB • US Ink Case Study 39 US Ink Case Study Case Study January 2015 US INK/SUN CHEMICAL CORPORATION 2013-01-I-NJ R6    At the US Ink East Rutherford facility, install automatic fire alarm systems consistent with NFPA 72 (the National Fire Alarm Code) in manufacturing areas (such as mixing) where heat generation could occur. 2013-01-I-NJ R7    Revise the Capital Appropriations/Asset Request (CAR) form procedure for new installations and modifications to existing equipment to require at a minimum the following: • Process hazard analysis (PHA) • Management of change (MOC) • Review of engineering drawings for permits • Safety management of contractors • Training of plant operators based on applicable dust collection system guidelines and standards, including NFPA 91 and NFPA 654 2013-01-I-NJ R8    Develop and implement a management of organizational change protocol to allow for the transfer of knowledge and information to new personnel, at a minimum including initial and refresher training in the following: • Safety and health procedures • Lessons learned from previous incidents • Technical information for equipment • Routine plant operation

CSB • US Ink Case Study 40 US Ink Case Study Case Study January 2015 CSB Investigation Reports are formal detailed reports on significant chemical accidents and include key findings, root causes, and safety recommendations. CSB Hazard Investigations are broader studies of significant chemical hazards. CSB Safety Bulletins are short general interest publications that provide new or noteworthy information on preventing chemical accidents. CSB Case Studies are short reports on specific accidents and include a discussion of relevant prevention practices. All reports may contain safety recommendations if appropriate. CSB Investigation Digests are plain-language summaries of Investigation Reports. The U.S. Chemical Safety and Hazard Investigation Board (CSB) is an independent Federal agency whose mission is to ensure the safety of workers, the public, and the environment by investigating and preventing chemical incidents. The CSB is a scientific investigative organization; it is not an enforcement or regulatory body. Established by the Clean Air Act Amendments of 1990, the CSB is responsible for determining the root and contributing causes of accidents, issuing safety recommendations, studying chemical safety issues, and evaluating the effectiveness of other government agencies involved in chemical safety. No part of the conclusions, findings, or recommendations of the CSB relating to any chemical accident may be admitted as evidence or used in any action or suit for damages. See 42 U.S.C. § 7412(r)(6)(G). The CSB makes public its actions and decisions through investigation reports, summary reports, safety bulletins, safety recommendations, case studies, incident digests, special technical publications, and statistical reviews. More information about the CSB is available at www.csb.gov. CSB publications can be downloaded at www.csb.gov or obtained by contacting: U.S. Chemical Safety and Hazard Investigation Board Office of Congressional, Public, and Board Affairs 2175 K Street NW, Suite 400 Washington, DC 20037-1848 (202) 261-7600

FD06480 | 2015_美国_US Ink 火灾 - US Ink Fire__最终报告_2.pdf

分类:06_境外及港澳台调查报告 | 年份:2015 | 地域: | 严重程度: | 场所: | 起火原因: | 来源格式:pdf

(202) 234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. 1 U.S. CHEMICAL SAFETY BOARD

US INK/MILLARD REFRIGERATED SERVICES

PUBLIC MEETING

THURSDAY, JANUARY 15, 2015

U.S. CHEMICAL SAFETY BOARD MEMBERS PRESENT: RAFAEL MOURE-ERASO, Ph.D., Chairperson, U.S. Chemical Safety Board MANNY EHRLICH, JR., Member, U.S. Chemical Safety Board MARK GRIFFON, Member, U.S. Chemical Safety Board STAFF PRESENT: RICHARD C. LOEB, General Counsel JOHNNIE BANKS, CFEI, Investigations Supervisor LUCY TYLER, CSP, Investigator BEETA LASHKARI, Attorney/Investigator MICHAEL CORONA, Attorney/Investigator RICHARD GUNARATNAM, Investigator SAMUEL OYEWOLE, Ph.D., Investigator REEPA SHROFF, Investigator This transcript produced from audio provided by the U.S. Chemical Safety Board.

(202) 234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. 2 T-A-B-L-E O-F C-O-N-T-E-N-T-S Opening Statements Rafael Moure-Eraso. . . . . . . . . . . . . . . . 7 Manny Ehrlich . . . . . . . . . . . . . . . . . .13 Mark Griffon. . . . . . . . . . . . . . . . . . .14 Presentation of Millard Refrigerated Services Safety Bulletin Johnnie Banks . . . . . . . . . . . . . . . . . .17 Lucy Tyler. . . . . . . . . . . . . . . . . . . .22 Beeta Lashkari. . . . . . . . . . . . . . . . . .33 Board Questions to Investigators . . . . . . . . .35 Public Comment Orville Morales . . . . . . . . . . . . . . . . .48 John Morawetz . . . . . . . . . . . . . . . . . .50 Mark McDonald . . . . . . . . . . . . . . . . . .54 John Shin . . . . . . . . . . . . . . . . . . . .59 Peter Levitt. . . . . . . . . . . . . . . . . . .61 Board Vote . . . . . . . . . . . . . . . . . . . .63 Presentation of US Ink Case Study Johnnie Banks . . . . . . . . . . . . . . . . . .65 Michael Corona. . . . . . . . . . . . . . . . . .81 Samuel Oyewole. . . . . . . . . . . . . . . . . .88 Reepa Shroff. . . . . . . . . . . . . . . . . . .99 Rachael Gunaratnam. . . . . . . . . . . . . . . 106 Johnnie Banks . . . . . . . . . . . . . . . . . 119 Board Questions to Investigators . . . . . . . . 125 Public Comment Bruce Johnson . . . . . . . . . . . . . . . . . 134 Ashley Fitch. . . . . . . . . . . . . . . . . . 140 Paul Hofmann. . . . . . . . . . . . . . . . . . 144 Glenn Corbett . . . . . . . . . . . . . . . . . 149 Eric Frumin . . . . . . . . . . . . . . . . . . 152 Paul Piantino . . . . . . . . . . . . . . . . . 162 John Morawetz . . . . . . . . . . . . . . . . . 169 Board Vote . . . . . . . . . . . . . . . . . . . 173 Closing Statement. . . . . . . . . . . . . . . . 175

(202) 234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. 3 1 P-R-O-C-E-E-D-I-N-G-S 2 (Time not provided) 3 CHAIRPERSON MOURE-ERASO: Good evening 4 and welcome to this public meeting of the U.S. 5 Chemical Safety Board, the CSB. 6 First of all, I would like to call 7 your attention to the agenda that everybody 8 should have. There are copies in the front. As 9 you can see, today we have a composite meeting in 10 which we are covering two of our products that 11 are in investigations. You can read the contents 12 of the agenda. 13 We have opening statements. And first 14 we are going to make a presentation of the 15 Millard Refrigerated Services Safety Bulletin. 16 That is the issue of anhydrous ammonia. Then we 17 are going to have the Board asking questions to 18 the investigators after the presentation. And 19 then we are going to have public comment of 20 anybody that wants to come to that microphone and 21 speak. After that we are going to have a Board 22 vote on the acceptance of the safety bulletin of

(202) 234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. 4 1 Millard Industries. 2 After that presentation we are going 3 to have a short break and we reconvene. If we 4 are able to do it early, we'll do it early, but I 5 will be telling you the time. And then we are 6 going to have a presentation on the US Ink case 7 of East Rutherford here in New Jersey. That has 8 to do with combustible dust. Again, there will 9 be more questions particularly on the US Ink case 10 to the investigative team, investigatory team. 11 Then there are going to be public comments on the 12 report and following again by a Board vote 13 specifically for the US Ink study. 14 Then there will be a closing statement 15 and that will be the end of our meeting. 16 So to get us started I am Rafael 17 Moure-Eraso, the Chairperson of the Board. And 18 with me today are Board Members Mark Griffon and 19 Manny Ehrlich, Jr. to my left. Also joining me 20 here to my left is our general counsel, Richard 21 Loeb. And here you'll have a number of CSB staff 22 members including all the members of the two

(202) 234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. 5 1 investigative teams, the one in Millard 2 Industries and the one in US Ink. They are here 3 for the agency. Besides that we have all our 4 communication staff that are the ones that 5 organized and prepared this meeting. 6 As probably you all know, the CSB is 7 an independent non-regulatory federal agency that 8 investigates serious chemical accidents. The 9 investigations examine all aspects of chemical 10 accidents including physical causes related to 11 equipment design as well as inadequate 12 regulations, industry standards and safety 13 management systems. Ultimately, we use 14 recommendations or findings that are designed to 15 prevent similar accidents. 16 At this time I would like to recognize 17 representatives from the U.S. Congress and the 18 U.S. Senate that represent this district that are 19 present here. With us is a Representative of 20 Congressman Pascrell, and also I believe 21 representatives from Senator Booker and Senator 22 Menendez. If the representative for Congressman

(202) 234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. 6 1 Pascrell would like to address the audience, I 2 invite him to please approach this microphone in 3 the front. 4 (No audible response) 5 CHAIRPERSON MOURE-ERASO: If he's not, 6 I ask for the representative of Senator Booker if 7 he would like to say some words. Please. 8 PARTICIPANT: Just briefly. First of 9 all, welcome and thank you for being here in New 10 Jersey on behalf of Senator Booker this evening. 11 We thank you for your work particularly on the 12 report involving the US Ink incident in 2012. 13 And for those who don't know, today Senator 14 Booker did release a statement regarding a letter 15 he wrote to OSHA echoing concerns and 16 recommendations of the report that there be a 17 standard for combustible dust. 18 So other than that I have some of 19 those materials. I can leave some on the table 20 in the back. But again, thank you for being here 21 today. 22 CHAIRPERSON MOURE-ERASO: Thank you.

(202) 234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. 7 1 Thank you very much. 2 If the representative of Senator 3 Menendez would like to address the audience? 4 (No audible response) 5 CHAIRPERSON MOURE-ERASO: No? Okay. 6 So we'll proceed. The purpose of today's meeting 7 is to present two investigative reports. The 8 first is a safety bulletin on anhydrous ammonia 9 and addresses the release in a company called 10 Millard Refrigerated Services from Mobile, 11 Alabama. The second is a case study and it is a 12 combustible dust explosion that occurred right 13 here, or nearby in East Rutherford, New Jersey at 14 the US Ink facility. 15 The safety bulletin that is entitled, 16 "Key Lessons for Preventing Hydraulic Shock in 17 Industrial Refrigeration Systems" addresses the 18 design safety operations of ammonia refrigeration 19 facilities. The CSB believes that if ammonia 20 refrigeration facilities follow the key lessons 21 learned that we present in the report from this 22 Millard safety bulletin, first, dangerous

(202) 234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. 8 1 hydraulic shock events can be avoided that are 2 not clear sometimes that they could occur in this 3 industry, environmental damage could be 4 prevented, and potential fatalities and injuries 5 will also be prevented. 6 We think that the lessons learned in 7 the Millard investigations are relevant to many 8 anhydrous ammonia facilities in the U.S. 9 including many that operate in the State of New 10 Jersey. 11 The second investigation is a case 12 study on the explosion and flash fires that 13 occurred at the US Ink manufacturing facility 14 nearby in East Rutherford, New Jersey. This 15 incident occurred in October 9, 2012. Seven 16 workers suffered burn injuries when they gathered 17 at the entrance to the ink mixing room. As a 18 result of the CSB finding, the Board is 19 considering recommendations to OSHA and the State 20 of New Jersey. 21 Before we begin I'd like to introduce 22 the CSB's recently-confirmed Board member, Mr.

(202) 234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. 9 1 Manny Ehrlich, Jr. I know he doesn't kind of 2 feel comfortable with this, but because of the 3 pressures that we got in the Federal Government 4 he is the Honorable Manny Ehrlich, Jr. now. He 5 hails from this state of New Jersey and he is 6 participating today in his first CSB public 7 meeting. Mr. Ehrlich joins the CSB after decades 8 of working in the chemical industry and most 9 recently running his own consulting business. 10 Additionally, Mr. Rick Engler will be 11 joining us in the Board. I don't believe he's 12 here today. Is he here today? 13 (No audible response) 14 CHAIRPERSON MOURE-ERASO: But he will 15 be taking his place on the Board in the middle of 16 January. So he is not with us. I'm sorry, the 17 middle of February. They corrected here. I 18 think it's the 16th of February. I truly look 19 forward to working with both of the new Board 20 members and with Mr. Griffon on a new 21 reconstituted Board. 22 Lastly, I also would like to

(202) 234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. 10 1 acknowledge the late Senator Lautenberg. 2 Following the 2012 incident at US Ink the senator 3 formally asked the CSB to become involved in this 4 investigation. The senator requested in October 5 2012 for the deployment of the CSB to investigate 6 the fire and explosion at US Ink in East 7 Rutherford. His request is a reflection of his 8 lifetime concern for the well-being of the New 9 Jersey's workers and the communities in New 10 Jersey. 11 He had stated in his letter to the CSB 12 requesting our deployment, quote, "Working with 13 chemicals should not carry an unreasonable risk 14 of injury and hurt." And that is a moral that he 15 live for all through his life as a senator of the 16 United States. 17 Senator Lautenberg was a great leader 18 and an ardent supporter of work place safety and 19 environmental protection. Among his many 20 legacies was working to establish, to fund and to 21 sustain the U.S. Chemical Safety Board. He is 22 widely considered to be the father of the agency.

(202) 234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. 11 1 We can enter now into business. 2 Please take a moment to note the locations of the 3 exits from this meeting room. In case of an 4 emergency there is the exit on the back where you 5 enter and there is another exit through that 6 curtain, if need be. So there are two exits. 7 I also ask that you please mute your 8 cell phones so that the proceedings are not 9 disturbed. 10 Next I would like to acknowledge the 11 CSB investigation team who will be presenting the 12 draft report to us today. They will describe 13 their findings into these two investigations. 14 After each of the staff presentations, as you can 15 check in the agenda, there will be an opportunity 16 for public comments first for Millard 17 Refrigerated Service on the anhydrous ammonia 18 case, and second in the US Ink on the combustible 19 dust case. 20 If anyone in the audience wishes to 21 comment publicly, please sign up at the entrance 22 in the tables in the check-in area and I will

(202) 234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. 12 1 call your name at the appropriate time at the 2 moment of the public comments. 3 Please note that we will have to limit 4 public comments to three minutes. And we would 5 like to request that the comments be relevant to 6 the two investigations being discussed today. 7 I would like to thank the D.C.-based 8 investigative team led by Johnnie Banks that is 9 here with us, the team lead, for their strong 10 commitment and dedication to their work. These 11 teams all under the direction of Mr. Banks were 12 in charge of both of these investigations, the 13 one in Alabama and the one here in New Jersey. 14 And I would also like to thank you, 15 the audience, for being interested in the work of 16 the CSB. I see a lot of familiar faces that have 17 been following our work through the years and I 18 appreciate your coming here and giving comments 19 to improve our work in the future and following 20 us and following the products of the agency. 21 I will now recognize my other Board 22 members for opening statements, and first I would

(202) 234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. 13 1 like to ask our newest Board member, Mr. Manny 2 Ehrlich. So, Mr. Ehrlich? 3 MEMBER EHRLICH: Thank you, Mr. 4 Chairman. Good evening. As the Chairman pointed 5 out, I am a native of New Jersey. It's always 6 good to come to a meeting like this and see the 7 faces of some people that I've worked with in the 8 past and it's always nice to have people not ask 9 you what exit you live at in New Jersey. 10 I've got 45 or 50 years of experience 11 in the chemical industry in positions that range 12 from pilot plant manager to plant manager to vice 13 president of health and safety and director of 14 emergency response. My last 25 years have been 15 focused on safety and health issues with 16 particular emphasis on worker safety. I've been 17 involved in several situations during my career 18 where lives have been lost and I'm absolutely 19 committed to take the lessons that I've learned 20 and share them with members of this Board and the 21 chemical community at large to see to it that 22 they never happen again. That's the best I can

(202) 234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. 14 1 promise to you, and I will work diligently at 2 that. 3 I'm pleased and proud to be affiliated 4 with an organization like this. This is a fine 5 organization and I make my commitment to you as 6 to well as the people of the United States to 7 work diligently on this Board to help further 8 their commitment to reducing chemical plant 9 incidents and saving lives. Thank you very much. 10 CHAIRPERSON MOURE-ERASO: Thank you, 11 Mr. Ehrlich. 12 Now, Mr. Griffon. 13 MEMBER GRIFFON: Thank you, Chairman. 14 And very nice remarks, Mr. Ehrlich. 15 I want to say we're here tonight 16 discussing two types of incidents that the CSB 17 over the last 15 years has seen with great 18 frequency, combustible dust incidents and ammonia 19 releases. 20 First, with regard to the safety 21 bulletin based on the incident involving an 22 ammonia release at Millard. I believe this

(202) 234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. 15 1 report includes some important lessons for all 2 similar industries regarding operation and design 3 of these types of systems, as well as emergency 4 response to releases when they do occur. I 5 believe that in addition to these technical fixes 6 there are also lessons to be learned regarding 7 decision making. 8 I think industry leaders should be 9 asking themselves a couple questions. Do our 10 sites have adequate on-site expertise to operate 11 safely during off normal conditions? How are 12 emergency shutdown decisions made when the 13 company is weighing the potential loss of 14 product; in this case food, against safety and 15 health consequences of an ammonia release? I 16 hope the industrial sector takes away some 17 valuable lessons from this important safety 18 bulletin. 19 With regard to the US Ink incident my 20 remarks are unfortunately going to be very 21 similar to remarks I've made at the Hoeganaes 22 meeting in November 2011 and at the recent AL

(202) 234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. 16 1 Solutions meeting in July 2014, two other 2 combustible dust cases that we investigated. 3 At US Ink we have yet another tragedy 4 resulting from a combustible dust explosion, an 5 issue for which the Board since 2006 has 6 recommended that a federal safety standard is 7 needed. It is very troubling that we are here 8 reporting on yet another combustible dust 9 incident and reissuing a recommendation for a 10 federal safety standard. The time for action is 11 way past due. For this Board's part I plan to 12 work with my colleagues on the Board to continue 13 to advocate for the development of such a federal 14 combustible dust standard. Thank you. 15 CHAIRPERSON MOURE-ERASO: Thank you, 16 Mr. Griffon. 17 At this time I would like to introduce 18 the CSB leading investigator on these two 19 investigations, Mr. Johnnie Banks. I will ask 20 him to introduce his team of investigators and to 21 proceed with the presentation of the Millard 22 Refrigerated Services safety bulletin.

(202) 234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. 17 1 Mr. Banks? 2 INVESTIGATOR BANKS: Thank you. Mr. 3 Chairman, Board Member Griffon, Board Member 4 Ehrlich, Mr. Loeb, ladies and gentlemen, good 5 evening. 6 The Millard Refrigerated Services 7 investigation team is prepared to present 8 findings and key lessons from our investigation 9 of an anhydrous ammonia release that occurred at 10 the Millard Refrigerated Services facility in 11 Theodore, Alabama on August 23rd, 2010. 12 The release was caused by ruptured 13 piping on the roof inside the Millard facility. 14 As a result of the release 152 members of the 15 public and one Millard employee suffered injuries 16 consistent with ammonia exposure. Thirty-two of 17 those victims were hospitalized and four were 18 placed in intensive care. 19 This evening's presentation will 20 summarize the incident and list key lessons for 21 the ammonia industry to prevent future ammonia 22 releases from a damaging event called hydraulic

(202) 234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. 18 1 shock, also known as liquid hammer, that can 2 occur in refrigeration equipment and piping. 3 I'd like to take this opportunity to 4 provide an overview of the agenda for the 5 evening's proceedings. We'll begin with the 6 team's presentation of investigation findings. 7 The team will then entertain questions from the 8 Board. The public will be invited to offer 9 comments. The Board members will then vote on 10 the team's proposed key lessons. And finally, a 11 closing statement from the Chair. 12 And before I start I'd like to 13 introduce the Millard investigative team, which 14 includes myself, Johnnie Banks, supervisory 15 investigator; Ms. Lucy Tyler, investigator; and 16 Beeta Lashkari, attorney/advisory investigator. 17 At the time of the 2010 incident at 18 Millard Refrigerated Services it operated as a 19 refrigerated warehouse and distribution company 20 with 36 facilities in the United States and 21 Canada. The company was headquartered in Omaha, 22 Nebraska. The Millard facility in Theodore,

(202) 234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. 19 1 Alabama, the location of the 2010 incident, was a 2 marine export facility that stored, packaged and 3 froze poultry and other meat products. Millard 4 loaded product onto ships docked at the facility 5 for international shipment. And here we have a 6 satellite image of the facility. 7 Now Millard operated a 240,000-square- 8 foot cold storage facility that could store up to 9 24 million pounds of product, mostly frozen 10 poultry and beef. It had storage freezers and 11 three blast freezers that were capable of rapidly 12 freezing product within 24 hours. 13 Now the Theodore facility was located 14 along the Theodore industrial channel that served 15 the Mobile Bay in Alabama. The facility became 16 Millard Maritime in 2013 and the company stopped 17 using cold storage and now stores and exports 18 other products. 19 The ammonia refrigeration system at 20 Millard contained up to 143,000 pounds of 21 anhydrous ammonia. This slide shows a simple 22 depiction of the ammonia refrigeration cycle. In

(202) 234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. 20 1 the refrigeration process ammonia is not 2 generated or consumed. It changes phase from a 3 liquid to a gas it moves from heat from the 4 freezer or refrigerated areas. Liquid ammonia 5 absorbs heat as it turns to a vapor and the vapor 6 is then compressed and condensed back into a 7 liquid where it cycles back through the 8 refrigeration process. 9 Now anhydrous ammonia is a very 10 commonly used chemical used in industrial 11 refrigeration as well as many other industries 12 and it is a hazardous material. Ammonia is a 13 colorless gas at a normal temperature with 14 irritating odor. When released to the atmosphere 15 it forms an aerosol with the moisture in the air 16 and produces a visible white cloud. It is 17 irritating to the eyes and respiratory system and 18 at high concentrations can result in death. An 19 explosion or deflagration can occur if ammonia is 20 present in the air at an explosible concentration 21 and an ignition source is nearby. 22 Before we describe the incident, the

(202) 234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. 21 1 technical failure at Millard, we'll first briefly 2 describe the purpose and functionality of 3 evaporators in an ammonia refrigeration system. 4 In large refrigeration systems low-temperature 5 liquid ammonia is pumped through evaporator coils 6 located in the cold storage areas and freezers to 7 cool within those respective spaces. Air 8 temperature in the freezer decreases as liquid in 9 the coils transfers to a gas. Over time moisture 10 from the air builds up on the external surfaces 11 and the evaporator coil in the form of frost. 12 If not periodically removed the frost 13 accumulating on the evaporator coil surfaces 14 eventually reduces the evaporator's ability to 15 cool the space. A hot frost defrost cycle is a 16 common technique used to periodically melt the 17 accumulated frost from the evaporator coil 18 surfaces by interrupting the normal cooling mode 19 and circulating hot ammonia gas through the coil 20 to warm the evaporator surface. 21 Now Investigator Tyler will now 22 discuss the evaporating piping configuration and

(202) 234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. 22 1 defrost cycle. 2 INVESTIGATOR TYLER: Thank you. Good 3 evening. 4 This figure is a schematic of the 5 evaporator coil and its associated piping. Low- 6 temperature ammonia is fed into the evaporator 7 from the bottom. It evaporates to cool the space 8 and the remaining ammonia gas is removed through 9 a suction valve at the top. At Millard the 10 liquid ammonia was at minus 40 degrees 11 Fahrenheit. When the defrost cycle initiates, 12 low-temperature liquid ammonia is pumped out of 13 the evaporator coils and the coils are void of 14 liquid. This is a crucial step in the process to 15 ensure all cold liquid refrigerant is removed 16 before adding hot high-pressure gas. 17 And to melt the frost on the coils hot 18 gas at 110 degrees Fahrenheit is pumped into the 19 evaporator coil for a short time. The hot gas 20 fed into the coil increases the coil temperature 21 and causes the frost on the surface to melt. 22 After the hot gas melts the frost, the coil is

(202) 234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. 23 1 depressurized to remove any of the remaining hot 2 gas and liquid. When this is completed, the 3 liquid fills the coil and the refrigeration 4 process continues. The defrost cycle at Millard 5 was designed to last about 130 minutes. 6 Evaporator piping in ammonia 7 refrigeration systems is susceptible to a 8 damaging hydraulic shock event during the hot gas 9 defrost cycle. This is most common during the 10 transition between the low-temperature liquid and 11 hot gas and can be avoided by proper 12 refrigeration system design and operation. 13 Hydraulic shock is a sudden localized 14 pressure spike that can occur in piping and 15 equipment when there is a sudden change in the 16 velocity of a flowing liquid. It is very common 17 in steam and water systems and often causes an 18 audible hammering and knocking sound in piping. 19 During hot gas defrost evaporator coils 20 containing hot gas are isolated from the low 21 temperature side of the system by control valves. 22 If the defrost cycle is interrupted causing one

(202) 234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. 24 1 of the control valves to rapidly open, the hot 2 high-pressure gas can come into contact with the 3 low-temperature ammonia under vacuum. 4 A cause of hydraulic shocks more 5 common in ammonia systems is the rapid opening of 6 a valve from high pressure to low pressure. If 7 the coil rapidly depressurizes, refrigerant 8 liquid and vapor will accelerate into the 9 downstream suction piping leading to a damaging 10 hydraulic shock event. And this is similar to 11 what happened on the day of the Millard release 12 incident. 13 Now I will describe the ammonia 14 release incident that occurred in August 2010. 15 On the evening prior to the ammonia 16 release Millard experienced a loss of electricity 17 for about seven hours. Operators reported 18 experiencing issues with the control system when 19 the refrigeration system got back on line. 20 Immediately before the incident occurred at about 21 8:45 in the morning hot gas defrost was in 22 progress for a group of blast freezer

(202) 234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. 25 1 evaporators. At about the same time an operator 2 was troubleshooting alarms in the control system 3 as a result of that power outage. 4 While clearing alarms the defrost 5 cycle on a group of blast freezer evaporators was 6 reset. Due to an error with the programming 7 logic in the control system, the reset triggered 8 the evaporator to automatically go into 9 refrigeration mode without first bleeding hot gas 10 from the coil. The system triggered a valve to 11 open and liquid refrigerant was charged to the 12 coil. This caused the hot gas to rapidly 13 condense and liquid accelerated through the coil 14 and into the suction piping on the roof. 15 Operators became aware of the ammonia 16 release shortly before 9:00 a.m. Millard workers 17 were in the process of loading two international 18 ships with frozen poultry on the docks. An 19 ammonia release occurred inside one of the 20 facility's blast freezers which set of multiple 21 alarm sensors alerting employees. On the right 22 is a photo of the release taken inside the

(202) 234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. 26 1 warehouse shortly after the incident occurred. 2 At about the same time a visible cloud 3 of ammonia appeared on the roof of the Millard 4 Refrigerated Services facility from the piping. 5 A large white cloud of ammonia traveled south 6 across the canal in the direction of the wind. A 7 total of 32,100 pounds of anhydrous ammonia was 8 released. And on the left is a photo of the 9 ammonia release on the roof. You will notice a 10 white cloud from the ammonia leaking under the 11 insulation that surrounded the ends of those 12 pipes. 13 Here is a graphic that depicts the 14 ammonia cloud produced by the release. Emergency 15 responders reported to the CSB that the cloud 16 formed on the roof and traveled down the south 17 side of the facility and hovered near the ground 18 as it traveled across the river. 19 On the day of the incident off-site 20 contractors conducting cleanup operations for the 21 Deep Water Horizon oil spill in the Gulf of 22 Mexico were working at a temporary site about a

(202) 234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. 27 1 quarter of a mile to the south of Millard. Over 2 800 contractors were present working outdoors or 3 in large tents on the other side of the canal. 4 This next photo depicts the cloud from 5 the ammonia release as it traveled across the 6 canal where Deep Water Horizon workers were 7 staged. The workers were engulfed in the toxic 8 cloud and immediately reported experiencing 9 symptoms of ammonia exposure. The contractors 10 were instructed to go into their cars and 11 evacuate the facility. 12 Of those 800 off-site contract 13 workers, as well as crew members on the ships 14 that were docked at Millard, 152 reported ammonia 15 exposure symptoms. Thirty-two of those one 16 hundred and fifty-two were hospitalized and four 17 were placed in intensive care. 18 The Mobile Fire Department and 19 emergency medical services that responded to the 20 incident set up a triage near the Deep Water 21 Horizon cleanup site where many were evaluated, 22 treated and released and evacuated from the area.

(202) 234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. 28 1 Some were transported to the hospital. 2 In response to the number of off-site 3 exposures, the Center for Disease Control's 4 Agency for Toxic Substances and Diseases 5 Registry, or ATSDR, conducted an exposure survey 6 in Theodore following the incident. According to 7 the CDC And ATSDR, common symptoms reported were 8 headache, shortness of breath and coughing. 9 Other symptoms included eye irritation, nausea, 10 chest pain and dizziness. The CSB followed up 11 with the Mobile County Health Department 12 following the release and confirmed that there 13 were no documented long-term effects of ammonia 14 exposure from those who experienced symptoms 15 following the incident. 16 One Millard employee working in the 17 crane was overcome with ammonia from the rooftop 18 release while he was loading the ships docked at 19 Millard. He attempted to escape, reports briefly 20 losing consciousness and falling several feet 21 injuring his leg. In addition to his leg injury 22 he reported symptoms consistent with ammonia

(202) 234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. 29 1 exposure. Another Millard employee who responded 2 to the ammonia release by closing valves on the 3 roof was treated for heat exhaustion and released 4 from the hospital. In addition to the injuries, 5 the Mobile County Emergency Management Agency 6 ordered a shelter-in-place for the nearby 7 community for several hours following the 8 release. 9 Eight million pounds of product stored 10 at Millard were contaminated and destroyed as a 11 result of the release inside the warehouse blast 12 freezer. 13 The Coast Guard also temporarily 14 halted water traffic in the industrial canal 15 until the release was contained. 16 The ammonia release was caused by a 17 hydraulic shock event when the defrost cycle was 18 interrupted on a group of evaporators. This 19 resulted in a rupture of two pieces of ammonia- 20 containing equipment associated with those 21 evaporators. Here are two photos showing the 22 cracked weld in an evaporator piping manifold

(202) 234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. 30 1 that was located inside the blast freezer. 2 This slide shows photos of the cracked 3 suction header on the roof. This 12-inch- 4 diameter pipe is associated with the evaporator 5 equipment and the blast freezer. The force of 6 the impact generated by the propelled liquid 7 ammonia in the hydraulic shock event cracked the 8 end of the suction line. The crack went through 9 the circumferential weld on the end of the pipe. 10 On the bottom left is a photo of the 11 fracture surface in this three-eighths-inch-thick 12 suction line. Right there. This photo reveals 13 that the metal failed under brittle conditions as 14 the pipe was operating at minus 40 degrees. 15 Again, here is a schematic of the 16 defrost cycle except this time we're showing what 17 likely happened on the day of the incident. 18 During the hot gas cycle the liquid feed valve 19 and suction valves were opened prematurely. 20 Right there and here. This resulted in the cold 21 and hot ammonia to be present in the coil and 22 into the suction header on the downstream side of

(202) 234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. 31 1 the suction stop valve. The rapid condensation 2 propelled the liquid through the coil and into 3 the suction piping. The approximate locations of 4 the failures of the evaporator coil are 5 identified here and here. 6 This slide shows the progression of a 7 hydraulic shock event inside the pipe. Here is a 8 cross-section of an evaporator coil containing 9 hot gas at 110 degrees Fahrenheit. When the 10 defrost cycle was interrupted, the hot gas and 11 minus 40-degree liquid ammonia became present in 12 the same pipe. The hot gas rapidly condensed to 13 a liquid upon contact with the cold minus 40- 14 degree refrigerant. Voids of trapped gas built 15 up pressure and rapidly condensed creating a 16 vacuum. 17 The reduction in volume produced an 18 inrush of liquid from other parts of the system. 19 The liquid accelerated at a high velocity when it 20 arrived at an obstruction such as the end cap on 21 the roof and it abruptly stopped and exerted a 22 force on the piping. The force of the impact was

(202) 234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. 32 1 strong enough to crack the weld on the evaporator 2 piping in the blast freezer as well as the 12- 3 inch piping on the roof ultimately resulting in 4 the release of 32,000 pounds of ammonia. 5 The CSB found in their investigation 6 of the 2010 Millard ammonia release incident that 7 both design and operational issues led to the 8 hydraulic shock failure at the Theodore facility. 9 The investigation team developed lessons learned 10 in the CSB safety bulletin released today to 11 prevent similar hydraulic shock incidents from 12 occurring in the industrial refrigeration 13 industry. 14 CSB safety bulletins are products that 15 focus on the immediate and technical failures of 16 an incident and focus key lessons on the 17 prevention of future incidents. The intended 18 audience for these key lessons is the ammonia 19 industry, including refrigerated warehouses, food 20 production and storage facilities, as well as 21 institutions that provide training and education 22 to ammonia refrigeration system designers and

(202) 234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. 33 1 operators with the aim of preventing hydraulic 2 incidents from occurring in ammonia-containing 3 equipment. 4 The CSB will be releasing a safety 5 video about the Millard incident and hydraulic 6 shock. The video will be available on our Web 7 site, www.csb.gov, later this month. 8 And now Attorney/Investigator Beeta 9 Lashkari will come to the podium to present the 10 CSB's lessons learned from the Millard 11 investigation. Thank you. 12 INVESTIGATOR LASHKARI: Thank you, Ms. 13 Tyler. 14 Lessons learned. Refrigeration system 15 design. 1) For the design of ammonia 16 refrigeration systems avoid grouping multiple 17 evaporators to a single set of control valves. 18 This is especially important for large-capacity 19 evaporators in excess of 20 tons. Evaporators 20 with hot gas defrost systems should be controlled 21 by individual valve control groups dedicated to 22 each evaporator coil.

(202) 234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. 34 1 Refrigeration system operation. 2) 2 Program or configure defrost control systems with 3 interlocks to ensure the low-temperature liquid 4 feed and hot gas remain isolated during the 5 initiation and termination of the hot gas defrost 6 cycle in the event of a power outage, cycle 7 interruption or other abnormal situation. 8 Program the defrost control sequence to 9 automatically depressurize or bleed the coils and 10 defrost upon restart after an outage or 11 interruption prior to opening the suction stop 12 valve to set the evaporator into cooling mode. 13 3) Avoid the manual interruption of 14 evaporators in defrost and ensure systems are 15 equipped with password protection to ensure only 16 trained and authorized personnel have the 17 authority to manually override system processes. 18 4) For time-initiated hot gas defrost 19 systems ensure pump-out times are long enough to 20 remove a sufficient amount of residual liquid 21 refrigerant in the evaporator coils prior to 22 introducing hot gas especially after low load

(202) 234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. 35 1 periods or power outage. 2 Responding to an ammonia release. 5) 3 In the event of an ammonia release that cannot be 4 promptly isolated activate the emergency shutdown 5 switch to de-energize pumps, compressors and 6 valves instead of attempting to isolate leaking 7 equipment while the refrigeration system is 8 running. Shutting down the equipment will stop 9 the circulation of ammonia and limit the release 10 of additional ammonia from components running 11 upstream of failed equipment or piping. 12 I now invite questions from the Board. 13 CHAIRPERSON MOURE-ERASO: Thank you 14 very much. I now will invite my fellow Board 15 members to ask questions to the investigation 16 team concerning this Millard investigation. Mr. 17 Ehrlich? 18 MEMBER EHRLICH: Yes, I have several 19 questions and they're all focused kind of around 20 the emergency response arena here. Was there any 21 indication at all that pre-emergency planning had 22 been done with the local first responders as part

(202) 234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. 36 1 of a HAZWOPER plan or an emergency planning 2 session? 3 INVESTIGATOR BANKS: We don't have any 4 documentation of such, but it affords the 5 opportunity to address that and speak to the need 6 to have an adequate pre-incident planning scheme 7 so that the responding fire departments and 8 emergency responders are on the same page. We've 9 encountered several instances in other incidents 10 where responders may be operating under the 11 National Incident Management System, or NIMS, 12 process and communications may not be clear and 13 such. We have some indication that there was 14 some issues with the volunteer fire department 15 response in concert with the Mobile Fire 16 Department, but I would imagine that those issues 17 have been resolved since then. 18 MEMBER EHRLICH: Did they have and 19 emergency response plan filed under the 1910.120 20 or an evacuation plan filed under 1910.38 OSHA 21 standard, do you know? 22 INVESTIGATOR BANKS: No, we don't.

(202) 234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. 37 1 MEMBER EHRLICH: Okay. You mentioned 2 the fact that there were audible or visual alarms 3 inside of the building to indicate an ammonia 4 release. Were any of those alarms set up so that 5 there was visual or audible indications outside 6 of the building? 7 INVESTIGATOR TYLER: No, there 8 weren't. That was one of the things that we 9 looked for early in the investigation, but we 10 learned that all of the ammonia sensors and 11 alarms were located inside the facility. So 12 there was no indication for workers outside if 13 there was an ammonia release unless they heard it 14 coming from the inside of the facility. 15 MEMBER EHRLICH: Had any training been 16 given to the employees of the ship crew or the 17 ship members relative to the potential hazards? 18 INVESTIGATOR TYLER: I'm unaware of 19 the training that they had related to ammonia 20 hazards, but I do know shortly after the release 21 occurred that one of the ship crew members was 22 very concerned about a possible deflagration or

(202) 234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. 38 1 an ignition from the ammonia vapors that were 2 escaping from the roof. So he worked with the 3 Mobile Fire Department to get the engines on the 4 ship shut down. 5 MEMBER EHRLICH: And did the people 6 inside of the plant -- do you know if they had 7 any training under respiratory standards or any 8 other general HAZWOPER standard? 9 INVESTIGATOR TYLER: We know that at 10 least one employee that responded to the ammonia 11 release was HAZWOPER trained, but we also learned 12 in our investigation that there were other 13 employees that responded to the release that had 14 not had their training under HAZWOPER and they 15 were -- they received a citation from OSHA for 16 that. 17 MEMBER EHRLICH: Yes. Just as a point 18 of information, there is a company here in New 19 Jersey who put in an ammonia refrigeration system 20 for frozen food manufacturing and they evaluated 21 a number of inherently safer technologies when 22 they put this system in, and they got the okay

(202) 234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. 39 1 from the state DEP to go ahead and use ammonia. 2 And they have a fail-safe system where if there's 3 any problem at all in the system, all of the 4 ammonia drains back to basically a gas-tight 5 room. And the off-site consequences of an 6 ammonia release were reported at zero parts per 7 million. 8 If you want information on that, you 9 can contact the New Jersey DEP, John Notta, and 10 he'll be able to assist you with that 11 information. Thank you. 12 CHAIRPERSON MOURE-ERASO: Any other 13 questions? Mr. Griffon? 14 MEMBER GRIFFON: Yes, just a couple, 15 two questions, but each of them have four or five 16 parts. 17 First, can you tell me a little more 18 about the points of failure with the system, 19 specifically did the piping and components meet 20 required design specifications? Were they used 21 beyond their design life? Were they properly 22 maintained and inspected?

(202) 234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. 40 1 INVESTIGATOR TYLER: Yes, sure, I can 2 answer that. The team conducted a visual 3 examination of the pipe that failed on the roof 4 of the Millard facility. We reviewed the 5 manufacturing records as well as the pressure 6 test records from the piping supplier. We 7 learned that the pipe was ASTM A106 grade B pipe, 8 which is one of the pipes that is recommended for 9 this type of service. The pipe was about four or 10 five years old at the time of the incident and 11 did not possess any visual signs of corrosion, 12 stress corrosion, cracking or any type of 13 metallurgical defect. 14 MEMBER GRIFFON: And maintenance and 15 inspection records, did you have a sense that 16 they were meeting the inspection timing, or were 17 there required inspection intervals and were they 18 doing those inspections? 19 INVESTIGATOR TYLER: Millard did have 20 a preventive maintenance program, but I don't 21 recall the frequency of their visual inspections 22 on that pipe.

(202) 234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. 41 1 MEMBER GRIFFON: Okay. Second 2 question is how was the decision made? You speak 3 about this decision to stop the leak rather than 4 initiating an emergency shutdown, and I'm curious 5 how the decision was made, and was loss of 6 product a factor in making this decision? I know 7 they were just coming back from a power outage 8 for several hours, I believe, and food was 9 probably thawing out. And also was there a 10 procedure in place for this and were they 11 following their procedure? 12 INVESTIGATOR TYLER: So to answer the 13 first portion of your question, I think that 14 product loss was definitely a concern for Millard 15 employees and management on that day. Having a 16 seven-hour power outage in Alabama in August, I 17 think that they were concerned about their 18 product starting to thaw. So when they had this 19 second release, I think that there was an attempt 20 to try to isolate it at the source instead of 21 shutting down the entire system. 22 Their emergency plan for responding to

(202) 234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. 42 1 an ammonia release does state to attempt to 2 locate and isolate the release, but with the 3 particular system that was the location of the 4 release on that day it was almost impossible for 5 them to isolate the release on the roof because 6 other pieces of ammonia-containing equipment 7 continued to feed into that pipe. So in that 8 particular incident shutting down the entire 9 system would have decreased the duration and 10 quantity of that release. 11 MEMBER GRIFFON: And how did they 12 ultimately, or who ultimately made the call for 13 going to an emergency protocol, an emergency 14 shutdown protocol? 15 INVESTIGATOR TYLER: I'm not quite 16 sure who that was. I know that the plant manager 17 as well as the refrigeration operator or plant 18 engineer were involved in that decision. And I'd 19 also just want to add that one of the things that 20 Millard had identified in their investigation 21 report that the emergency stop button should have 22 been activated to -- would have been the proper

(202) 234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. 43 1 response to that particular release. 2 MEMBER GRIFFON: Thank you. 3 CHAIRPERSON MOURE-ERASO: Thank you. 4 I have a couple of questions, too. But before I 5 would like to recognize that among the audience 6 here joining us is Mr. Rick Engler. He is in the 7 audience. He was recently confirmed by the 8 Senate for the position of a Board member and he 9 will be taking his place on the CSB Board in 10 February. I truly look forward to working with 11 you in the future, Rick. 12 I have a couple of questions. Mr. 13 Ehrlich mentioned that, like in every other 14 state, there is an active food refrigeration 15 industry in New Jersey. And I wonder if any of 16 you can discuss the prevalence of ammonia 17 incidents in the food industry, or of any other 18 industries, and if you can give us an idea of how 19 widespread is the problems with escapes of 20 ammonia and problems with ammonia in the nation. 21 INVESTIGATOR LASHKARI: I'd be happy 22 to answer that question for you. The CSB tracks

(202) 234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. 44 1 ammonia incidents of high consequence, high 2 consequence being those that report a result in 3 injury or a fatality, evacuation or shelter-in- 4 place of 500 residents or acute environmental 5 impact or economic impact of over $500,000 and 6 found that the total number of high consequence 7 incidents in all industries is 276 from the time 8 span of 2005 to 2014. And that accounts for 11 9 percent of all CSB-screened incidents. 10 In terms of industry type 15 reported 11 from refrigerated warehousing, 111 from food 12 manufacturing and 19 from food distribution. 13 Fifty-two percent of ammonia release incidents in 14 CSB incident screening data are from industries 15 like Millard that store, manufacture and 16 distribute refrigerated foods. 17 CHAIRPERSON MOURE-ERASO: Thank you 18 very much. I have another question. The CSB has 19 various options in conducting these 20 investigations. Some of the options include full 21 investigations that include recommendations to 22 different stakeholders, specifically regulatory

(202) 234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. 45 1 agencies in the federal and state level. In this 2 case the choice was made to conduct an 3 investigation to produce a safety bulletin that 4 is designed not to make specific recommendations 5 to either OSHA or EPA, but rather it takes 6 lessons learned to the refrigeration food 7 industry. It takes what you call a lessons 8 learned approach. Why was this option taken? 9 INVESTIGATOR BANKS: Well, the entity 10 that was Millard Refrigerated Services doesn't 11 exist anymore. They don't do cold storage. They 12 ship and store and move other commodities, but 13 they don't do cold storage. There would be no 14 recipient for recommendations which are a typical 15 offshoot of our investigative reports and case 16 studies. 17 We felt that the circumstances for 18 this case lent themselves to a fairly 19 comprehensive study of the hydraulic shock 20 phenomenon and that there were lessons learned 21 that were applicable to a wide array of food 22 processing and refrigeration services that

(202) 234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. 46 1 typically us ammonia in their processes. So both 2 factors were the main drivers for the decision to 3 create a bulletin and the lessons learned that we 4 have crafted for this product we feel there's a 5 significant audience out there that can draw and 6 learn from this to prevent recurrence. 7 CHAIRPERSON MOURE-ERASO: Thank you 8 very much. Also, it is my understanding that the 9 use of ammonia and the ammonia industry is highly 10 regulated. There are a number of regulations 11 that specifically address ammonia, and also of 12 course they are included on the PSM standard of 13 OSHA and the RMP standard of EPA. So will you 14 consider it's a high-regulated type of industry, 15 or there is a lot of law reading around how to 16 handle ammonia correctly? 17 INVESTIGATOR TYLER: Yes, through our 18 investigation we looked at PSM and RMP. The 19 Millard facility was covered under process safety 20 management as well as the risk management plan. 21 It's a highly-regulated chemical. And, yes, 22 there's a lot of literature available on the

(202) 234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. 47 1 hazards of ammonia, but what we thought would be 2 most useful for the ammonia refrigeration 3 industry; that includes anyone that handles in 4 ammonia in cold storage or any other type of 5 industrial operation, is the mechanism of 6 hydraulic shock. And that was why we focused 7 this bulletin on key lessons for the prevention 8 of that phenomenon. 9 CHAIRPERSON MOURE-ERASO: Thank you. 10 Yes, I remember they handling of anhydrous 11 ammonia and the production of anhydrous ammonia 12 is one of the kind of building blocks in the 13 teaching of chemical engineering. I mean, every 14 chemical engineer that is here will know that in 15 Chemical Engineering 101 is where you study the 16 ammonia industry and how it functions. And so, 17 not a lot about safety, but the ammonia industry 18 is very well known. It's a very old industry. I 19 think it's considered like the type of industry 20 that defined chemical engineering. So it's a 21 whole system of -- so thank you very much. 22 For anybody that follows the program

(202) 234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. 48 1 here, we just have finished the Board questions 2 to the investigators and we are moving into the 3 public comment. I would like for the public 4 comment to ask the managing director of the 5 Chemical Safety Board, Dr. Daniel Horowitz, to 6 preside the public comments. 7 So, Daniel, please? 8 DR. HOROWITZ: Thank you, Mr. 9 Chairman. 10 The first commenter is Mr. Orville 11 Morales (phonetic) representing Congressman 12 Pascrell. 13 MR. MORALES: Good evening, ladies and 14 gentlemen. Good evening, members of the Board. 15 I am Orville Morales representing Congressman 16 Bill Pascrell of the 9th Congressional District. 17 Unfortunately he couldn't be here tonight, but he 18 wanted to make sure that his thoughts were heard 19 on this particular matter. 20 So on behalf of Congressman Pascrell, 21 thank you to the Chemical Safety Board for coming 22 to Bergen County and holding this public hearing

(202) 234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. 49 1 tonight and for your report on the explosion that 2 occurred at US Ink in 2012. Our hearts go out to 3 the employees who were injured and their 4 families. 5 The events two years ago shed 6 important light on the need for safety standards 7 for combustible dust. These standards are long 8 overdue. We know that the CSB has been pushing 9 for these standards for almost a decade. The 10 reality is without these standards our workers 11 are simply not safe. We want the public and the 12 Board to please be assured that Congressman 13 Pascrell will work to push OSHA to establish 14 meaningful standards for combustible dust which 15 will go a long way in preventing a tragedy like 16 this from happening again. Thank you. 17 CHAIRPERSON MOURE-ERASO: Thank you 18 very much, Mr. Morales. 19 DR. HOROWITZ: Thank you. Next up is 20 John Morawetz. And, John, if you don't mind to 21 spell your name for the court reporter. Thank 22 you.

(202) 234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. 50 1 MR. MORAWETZ: Sure. It's Morawetz, 2 M-O-R-A-W-E-T-Z. Thank you again for doing the 3 investigative work that the CSB, the Board and 4 the staff do. When I talk about to people I work 5 with and the members of about nine different 6 unions that we train, we always point to the CSB 7 reports as excellent reports for two primary 8 reasons: One, the root cause analysis to what 9 happen where many other agencies have other 10 missions and other investigations they do and are 11 limited by. And I think it's a real strength of 12 the Board and the reports and the staff that they 13 really get into how everything happened. 14 Number two is the recommendations, 15 which in general I understand is the safety 16 bulletin. But in general the recommendations are 17 often far-reaching, as the staff have said, not 18 just for one company, which right now at this 19 facility they don't do refrigeration, but Millard 20 is a very large company that has I think over 30 21 refrigeration warehouses. So those lessons can 22 be spread.

(202) 234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. 51 1 I am here also in particular -- I'm 2 part of the Chemical Worker Council of the United 3 Food and Commercial Workers Union. And I was 4 requested by the health and safety staff of the 5 UFCW to come to the meeting because we have a 6 great interest in ammonia. It's used in many of 7 our facilities as documented by some 8 investigators: meat, poultry processing 9 facilities and refrigerated warehouses. And I 10 hope that there will be further work by the 11 Chemical Safety Board on ammonia. It's a very 12 large volume chemical. There are a lot of 13 releases as documented and they need further 14 investigation with full recommendations. 15 I would hope also that, as I've said 16 before, there could be adequate time to look at 17 the reports. I got this electronically this 18 afternoon as it was released in a press release 19 in a link, but I think for helpful back and forth 20 comments from the public and various 21 professionals and organizations I would hope 22 there was a method, which I leave to the CSB to

(202) 234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. 52 1 decide how to do that, where there could be time 2 for back and forth. 3 Limited in time, I would concentrate 4 on a few issues that I think that are touched 5 upon in terms of the lessons learned, which slide 6 No. 3 talked about operational issues. Operation 7 issues that I don't think were included are are 8 there adequate staffing levels? Were people 9 adequately trained? I think some of the Board 10 members mentioned that. There are a number of 11 applicable OSHA standards. It's not just 12 narrowly what happened, how was the response? 13 There are many factors go on. 14 Three years ago UFCW and Cargill did 15 a meeting of 10 different facilities about 16 ammonia and they identified that as a significant 17 problem of lean staffing, of non-trained workers 18 jointly by management activities. And quite 19 frankly, it's disappointing that that wasn't 20 looked at, wasn't examined. I understand again 21 it's a safety bulletin, but I think it's an 22 important factor.

(202) 234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. 53 1 Was there inspection of the piping 2 integrity? In this case that didn't happen, but 3 at least that should be looked at and reported 4 on. 5 And then in terms of the OSHA 6 standards, I understand this is not a place for 7 full regulatory analysis, but I find it strange 8 that there's very little mention of OSHA where 9 correctly the CSB repeatedly has asked, as they 10 will of the next, I believe, investigation, for a 11 combustible dust standard, that we don't also 12 look at when standards exist how were they 13 implemented? And this is clearly covered by 14 process safety management. I find it troubling 15 there's no mention of process safety management 16 or emergency response. No mention of HAZWOPER. 17 Again, not a regulatory analysis, but there could 18 at least be a list of what are the applicable 19 standards that would have applied? 20 And lastly, I'd just say again to 21 repeat, this is a safety bulletin. I would hope 22 that there could be a meeting convened or an

(202) 234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. 54 1 investigation; I'm not sure of the mechanism, by 2 the CSB with labor and management to sit down and 3 talk about the uses of ammonia and to find out 4 how we can handle it better. Thank you very 5 much. 6 DR. HOROWITZ: Thank you. Mark 7 McDonald (phonetic)? 8 MR. McDONALD: Good evening. United 9 Steel Workers District 4 and the United Steel 10 Workers Health Safety and Environmental 11 Department would first like to thank the Chemical 12 Safety Board for their extensive and thorough 13 investigation striving to find the root causes 14 for these horrific accidents. We would also like 15 to thank the CSB for their dedication to 16 protecting workers and surrounding communities 17 from the hazards during these investigations and 18 their diligence in recommending and campaigning 19 for safer policies, procedures and laws to 20 prevent these tragedies from happening again. 21 Our long-time history of working with 22 the CSB has developed recommendations and later

(202) 234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. 55 1 laws that have prevented further tragedies from 2 occurring. Our work is not done. We still have 3 to push to keep laws and policies intact in order 4 to keep our workers and communities safe. 5 New Jersey is not like the rest of the 6 country. Our land use and risk factors justify 7 more stringent state regulations. More stringent 8 state regulations is authorized by most if not 9 virtually all federal environmental laws, and New 10 Jersey has led the country in that regard. 11 New Jersey's Toxic Catastrophic 12 Prevention Act, TCPA Program, was the model for 13 the federal program established under Section 14 112(r) of the Clean Air Act. Industries would 15 obviously prefer backing off of the EP -- and 16 using EPA thresholds. However, the increases 17 made by the EPA on adoptions were so large, 18 averaging some 18 times the CPA values, with 33 19 of the 60 substances common to both lists 20 assigned from 5 to 167 times corresponding TCPA 21 values, but they are not technically justified in 22 an area as densely populated as New Jersey where

(202) 234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. 56 1 substances are generally handled on a small site 2 and would correlate with a significant increase 3 in the number of potential fatalities. 4 In New Jersey TCPA threshold quantity 5 for anhydrous ammonia is 5,200 pounds. This 6 lower threshold is justified by risk as a 7 function of the New Jersey population density and 8 proximity to chemical use. In contrast, the 9 federal thresholds quantity is almost twice New 10 Jersey's at 10,000 pounds. That means more 11 facilities are regulated under the New Jersey 12 program and that more people are protected from 13 catastrophic release of a highly toxic chemical. 14 In addition to a lower threshold of 15 the regulations the TCPA Program provides 16 additional regulatory and oversight safeguards 17 and far more compliance monitoring and 18 enforcement resources per facility than the 19 federal programs which include but are not 20 limited to mandatory inspections versus 21 discriminatory three-year federal inspections. 22 Risk considerations. The industry

(202) 234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. 57 1 testimony failed to mention the most critical 2 issues, the risk of workers and nearby 3 communities that could be exposed to the 4 catastrophic release of an accident. TCPA and 5 federal regulations require a facility to model 6 the risks of such an event. To understand the 7 natural and magnitude of these risks legislators 8 need to ask the industries to present their 9 consequence analysis on New Jersey's TCPA 10 regulations. 11 Status of TCPA regulations. Contrary 12 to the industry testimony that suggested that the 13 New Jersey TCPA regulations were outdated and not 14 informed for by more recent improvements of the 15 federal programs, please be advised that the 16 current New Jersey DEP TCPA regulations were 17 readopted with amendments on March 16th of 2009. 18 The TCPA rules were scheduled to expire in 2014, 19 but were extended two years as a result of recent 20 legislation that extended the sunset date for 21 rules from five to seven years. 22 The TCPA is now under attack by two

(202) 234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. 58 1 bills, S-2511 and A-3881, that would weaken New 2 Jersey's Toxic Catastrophic Prevention Act. The 3 bill removes anhydrous ammonia used by 4 refrigeration as substances regulated by TCPA. 5 It is our understanding that anhydrous ammonia 6 refrigerant issues were specifically considered 7 by DEP in the 2009 readoption process and that 8 the DEP expressly reviewed and rejected the 9 industry's request to weaken New Jersey's 10 requirements. 11 According to the DEP TCPA regulations 12 the basis for regulating anhydrous ammonia is 13 twofold: Mandated by -- listed by Congress 14 ammonia is an extraordinarily hazardous 15 substance, and EHS lists vapors pressure 10 16 millimeters of mercury pressure according to the 17 Federal Agency of Toxic Substances and Disease 18 Registry. Risks from anhydrous ammonia include 19 death from inhalation, as we all know. 20 We ask for the CSB's continued support 21 on this fight to keep New Jersey's Toxic 22 Catastrophic Prevention Act in place and their

(202) 234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. 59 1 future support to protect workers and the 2 surrounding community. Thank you. 3 DR. HOROWITZ: Thank you, Mr. 4 McDonald. 5 CHAIRPERSON MOURE-ERASO: Thank you 6 very much. 7 DR. HOROWITZ: Next up is John Shin 8 (phonetic). Mr. Shin? 9 MR. SHIN: Good evening. I'm John 10 Shin. I'm the district director for the United 11 Steel Workers in District 4. District 4 consists 12 of nine states in the Northeastern United States, 13 including the six New England states, New York, 14 New Jersey, Delaware and also Puerto Rico. Also 15 I sit on the board of the Work Environment 16 Council in New Jersey. 17 I have one concern and a couple 18 questions I'd like to ask. First one, my concern 19 is the Steel Workers Union is very disappointed 20 in the Chemical Safety Board's short notice of 21 this public meeting. We would ask that longer 22 notice be given in the future to give all the

(202) 234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. 60 1 stakeholders an opportunity to participate in 2 these meetings. 3 Secondly, I have a question for the 4 Chairman. The question would be: Why has the 5 Chemical Safety Board lost its ability to provide 6 Web casts of Chemical Safety Board public 7 meetings? A lot of USW locals used to 8 participate in the Web casts and we would be ask 9 that they be re-instituted. 10 No. 3, third question: The Board 11 announced this week in its next public meeting -- 12 the next public meeting for later in January at 13 the Chevron, Richmond, California case. This is 14 a USW-represented facility. We're disappointed 15 that the Chemical Safety Board decided to have 16 this meeting just a couple weeks before the 17 fourth Board member would be sworn in and would 18 be able to participate in the meeting. We would 19 ask the Board to reconsider holding this meeting 20 after the fourth Board member is sworn in so they 21 can also participate in this meeting. Thank you 22 for your time.

(202) 234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. 61 1 DR. HOROWITZ: Thank you, Mr. Shin. 2 And to clarify one point that you did raise, we 3 do Web cast our meetings on occasion, and if 4 there's interest, we'll certainly look at 5 expanding that program. Thank you for your 6 comment. 7 Next up is Peter Levitt (phonetic). 8 Mr Levitt? 9 MR. LEVITT: Sorry, I wrote my name 10 down, but -- 11 (Simultaneous speaking) 12 DR. HOROWITZ: Okay. It does happen. 13 Is there anybody who didn't sign up who'd like to 14 comment on this case? 15 (No audible response) 16 CHAIRPERSON MOURE-ERASO: Thank you 17 very much, Dr. Horowitz. So we move to the Board 18 vote on the safety bulletin. I pass the gavel. 19 I pass the meeting to my general counsel to 20 conduct the vote. I will start by -- as a Board 21 member I make the following motion: I move that 22 the Chemical Safety Board approve Safety Bulletin

(202) 234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. 62 1 No. 2010-13-A-AL entitled, "Key Lessons for 2 Preventing Hydraulic Shock in Industrial 3 Refrigeration Systems: Anhydrous Ammonia Release 4 at the Millard Refrigeration Services, 5 Incorporated," based on an incident occurring in 6 Theodore, Alabama in August 23rd, 2010. Is there 7 any discussion on the motion? 8 PARTICIPANT: I second the motion, 9 first of all. 10 CHAIRPERSON MOURE-ERASO: Okay. 11 PARTICIPANT: I'll second the motion 12 and then I guess we can move to discussion. 13 CHAIRPERSON MOURE-ERASO: Yes. 14 PARTICIPANT: I just have one comment. 15 I do second the motion and I support the motion. 16 I do want to point out again; and I think Beeta 17 went through the numbers for us, which is very 18 good, there's been a lot of ammonia incidents and 19 I think in the future I would hope that the Board 20 will look at a study or a forum to discuss the 21 broader national problems of ammonia and look at 22 some of the other potential recommendations in

(202) 234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. 63 1 that area. That's the only comment I have. 2 CHAIRPERSON MOURE-ERASO: Anything 3 more for discussion of the Board members? 4 (No audible response) 5 CHAIRPERSON MOURE-ERASO: Okay. 6 Hearing no more discussion, I will call the 7 question. General counsel Mr. Loeb will record 8 the vote. 9 MR. LOEB: The motion is on the 10 question whether we adopt the report, and why 11 don't we just take it left to right? Mr. 12 Griffon? 13 MEMBER GRIFFON: I support and vote 14 yes. 15 MR. LOEB: Mr. Ehrlich? 16 MEMBER EHRLICH: I vote yes. 17 MR. LOEB: Mr. Chairman? 18 CHAIRPERSON MOURE-ERASO: I vote yes. 19 MR. LOEB: The motion is adopted. 20 CHAIRPERSON MOURE-ERASO: Thank you 21 very much. As a closing remark before we take a 22 break, I would like to say that we choose this

(202) 234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. 64 1 very specific approach of use lessons learned 2 aimed to alert the food refrigeration industry of 3 events that could trigger hydraulic shock, and 4 this is a event of a magnitude enough to cause 5 enormous escapes of anhydrous ammonia that as you 6 well know could be lethal for workers and for 7 communities. 8 This knowledge about hydraulic shock 9 is not widespread in the industrial refrigeration 10 industry and facilities and requires explicit 11 analysis and examination or how to be prevented. 12 I think that's what the safety bulletin does. 13 The message to the food and 14 refrigeration industry in New Jersey, in Alabama 15 and in all other states in the United States is 16 that hydraulic shock should be prevented and we 17 believe that our safety bulletin is a 18 contribution to that effect. 19 I think we finish the first part of 20 our meeting and I would like for a 15-minutes 21 break. After that we will reconvene to have the 22 second part of our meeting on US Ink case study.

(202) 234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. 65 1 So I declare a recess of 15 minutes. 2 (Whereupon, the above entitled matter 3 went off the record briefly.) 4 CHAIRPERSON MOURE-ERASO: Okay. We 5 reconvene the CSB public meeting. 6 First of all, before proceeding to the 7 US Ink case I would like to recognize Mr. 8 Krzystof Jaje, Mr. Stanley Pernesky, and Mr. John 9 Castro. They are all three workers for US Ink 10 that are with us here at this meeting. 11 So welcome. Thank you for being here 12 with us. 13 And we move to the next point of the 14 agenda. That is the US Ink presentation. I 15 would like to call again to Mr. Banks to begin 16 the presentation. And I will appreciate it if 17 Mr. Banks will introduce the members of his team. 18 So, Mr. Banks? 19 INVESTIGATOR BANKS: Good evening. 20 The next portion of the presentation tonight, the 21 US Ink investigation team is prepared to present 22 findings from our investigation of an ink dust

(202) 234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. 66 1 explosion and flash fires which occurred at the 2 US Ink manufacturing facility in East Rutherford, 3 New Jersey. 4 This incident occurred on Tuesday, 5 October 9th, 2012 and resulted in seven workers 6 suffering serious burn injuries when they 7 congregated at the entrance of the ink mixing 8 room after hearing a loud thump from the newly- 9 installed dust collection system on top of the 10 facility and seeing signs of an initial flash 11 fire from a bag dump station. 12 Before I start I'd like to take the 13 opportunity to provide an overview of the agenda 14 for this portion of our proceedings. Again, 15 proceeding with the team's presentation of 16 investigation findings. The team will entertain 17 questions from our Board. The public will be 18 invited to offer comments. The Board members 19 will vote on the team's proposed findings and 20 recommendations. And finally, we'll have a 21 closing statement from our Chair. 22 I'd like to take this opportunity to

(202) 234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. 67 1 introduce the team that investigated and 2 participated throughout this investigation, some 3 of whom are here, some that are not. There were 4 many contributors to the work on this 5 investigation and some that deployed on the 6 initial deployment immediately after the 7 incident. The core team consists of myself, 8 Johnnie Banks, the supervisory investigator; Mr. 9 Michael Corona, attorney/investigator; Ms. 10 Rachael Gunaratnam, investigator; Maria Musaki- 11 Bring (phonetic), investigator; Ms. Badisha 12 Parisrom (phonetic), investigator; Dr. Samuel 13 Oyewole, investigator; Ms. Reepa Shroff, 14 investigator; and Dr. Susan Casper-Onanberg 15 (phonetic), or deputy managing director for 16 recommendations. 17 The investigation team will conduct 18 the presentation, will discuss the company 19 background and provide an overview of the 20 facility and process and present the incident 21 description and the analysis of the incident, 22 investigation findings and introduce propose

(202) 234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. 68 1 recommendations. 2 Now, the US Ink company is a division 3 of Sun Chemical Corporation that's headquartered 4 in Carlstadt, New Jersey. The facility in East 5 Rutherford was established in 1993 and employed 6 34 workers, 24 of whom were on shift on the day 7 of the incident. 8 In looking at the black ink process, 9 we'll start with a brief description of the black 10 ink process. The US Ink East Rutherford plant 11 manufactures both black and color oil-based ink 12 for various commercial clients. A key step in 13 the ink production process is mixing solid and 14 liquid ingredients to produce liquid suspension. 15 The mixing operation for black ink ingredients is 16 performed in the pre-mix room where the October 17 9th, 2012 incident occurred. 18 The black ink manufacturing process at 19 US Ink involved the pneumatic transfer of bulk 20 solid powder under vacuum to one of three mixing 21 tanks labeled as T-106, T-206 and T-306. Two 22 solid ingredients; carbon black and kaolin clay

(202) 234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. 69 1 were conveyed to the mixing tanks by a vacuum 2 through piping from a manual raw material feeding 3 station known at US Ink as the bag dump station, 4 or by gravity from three overhead receiver 5 hoppers containing carbon black and kaolin. 6 Gilsonite, a resinous hydrocarbon, is 7 widely used as a primary carbon black wetting 8 agent for black news inks and heat set and 9 gravure inks. Gilsonite has a National Fire 10 Protection Association, or NFPA, flammability 11 rating of one and special precautions warn that 12 dusts are subject to explosion upon contact with 13 sparks, open flames or temperatures in excess of 14 1,000 Fahrenheit, or 570 degrees centigrade. 15 Petroleum distillate ingredients are 16 received at the facility by rail and are pumped 17 into the mixing tanks. Operators manage the 18 ingredient mixing from the control room adjacent 19 to the pre-mix room. Petroleum distillate used 20 in the process is flammable so they can be 21 considered as possible contributors to the 22 formation of explosive atmospheres on the day of

(202) 234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. 70 1 the incident. 2 Here's the simplified plan view of the 3 pre-mix room containing three large mixing tanks 4 in which the various ink formulations were made. 5 And if you look her,e you'll see that the tanks 6 were denoted T-106, T-206, T-306 right there. 7 The room itself was about 30 feet by 17 feet 8 deep. There was a control room immediately 9 adjacent to the pre-mix room. The bag dump 10 station was located here in the middle of the 11 rolling service door and there was a man door 12 that was located here that provided access to a 13 stairway that accessed the mezzanine elevated 14 stairway for access to the tanks themselves. 15 There was a corridor that ran directly in front 16 of the pre-mix room and the exposed depression 17 control panel and dust collector control panel 18 were located across from this area. There was a 19 man door that allowed access into the pre-mix 20 room as well. 21 All three mixing tanks in the area are 22 5 feet in diameter and 10 feet high. An

(202) 234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. 71 1 automatic sprinkler system was installed as a 2 fire protection feature in the pre-mix room. The 3 sprinkler system was connected to an automatic 4 audible alarm. Once the sprinkler system is 5 activated, an automatic signal is relayed by an 6 external central monitoring station to the local 7 fire department for immediate response. 8 Now the bag dump station was 9 positioned, as I said, in the doorway of the pre- 10 mix room and an overhead roll-up service door was 11 installed for access in the pre-mix room. At the 12 time of the incident the CSB found that the roll- 13 up service door had been chained in a fixed 14 rolled up position to provide easier entry into 15 the room. Witness accounts from the plant 16 employees and contractors indicated that 17 Gilsonite dust generated from the bag dumping 18 operation often accumulated around the facility, 19 but particularly on flat surfaces. US Ink did 20 not provide effective means of containing 21 fugitive dust at the bag dumping station since 22 empty bags were often stacked alongside the bag

(202) 234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. 72 1 dump which in turn lofted the dust into the 2 atmosphere. 3 Before the October 2012 incident a wet 4 scrubber system was used to collect particulate 5 materials during the dry material charging stages 6 of the ink mixing process. The scrubbing system 7 deteriorated over the years. In addition the wet 8 scrubber system did not prevent the release of 9 fugitive dust into the pre-mix room when new ink 10 formulations used high-powder clay content 11 producing higher levels of particulate emissions. 12 The new dust collection system was installed to 13 improve the management of particulate material 14 and provide an overall improvement to the 15 operating conditions of the black ink production 16 process. 17 A US Ink lead engineer worked in 18 collaboration with the manufacture of the dust 19 collection system to design the new dust 20 collecting process. The engineer retired before 21 the dust collection system was installed and 22 commissioned. When he left the knowledge of and

(202) 234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. 73 1 the rationale for the dust collector went with 2 him. 3 Here we have a view of the dust 4 collection system, an overview. And as before, 5 we can see that the bag dump station was located 6 here. There was duct work that went to -- 7 allowed access for the material into the pre-mix 8 tanks 106, 206 and 306. And there were various 9 sized ducts that made their way to the dust 10 collector, which was mounted on the roof. 11 The dust collection system illustrated 12 here consisted of a system of various sized ducts 13 including flexible connectors attached to the top 14 of each mixing tank and the bag dump station. 15 Dust particles were suctioned into the dust 16 collector, which was located in the roof of the 17 facility. The roof-mounted dust collector used a 18 cartridge system to remove the residual 19 particulate dust. Dust-laden air and vapor from 20 the mixing tanks entered the collector from the 21 cartridges and was drawn over the filters where 22 the dust was removed from the airstream.

(202) 234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. 74 1 A 25-horsepower fan was designed to 2 convey the dust up to the collector at a volume 3 rate of 3,300 cubic feet per minute. Compressed 4 air was used to periodically pulse the filter 5 cartridge and dislodge the filter dust into a 6 hopper of the dust collection system. 7 The collected dust was recycled back 8 to the ink making process via a 10-inch-diameter 9 pipe back to the top of T-106. A rotary air lock 10 on the hopper controlled the discharge of the 11 recycled fugitive dust via gravity from the 12 collector back into the mixing tank T-106 for 13 reprocessing in the pre-mix room. 14 Now, the dust collector was equipped 15 with an explosion suppression system. If a rapid 16 pressure increase was detected, sodium 17 bicarbonate would be released into the dust 18 collector. The explosion suppression system 19 would actuate and inject sodium bicarbonate via 20 an independent suppression container and chemical 21 isolation container located at two injection 22 points in the system, the dust collector hopper

(202) 234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. 75 1 and the inlet riser. 2 US Ink considered an explosion vent 3 panel system, but opted not to. The decision was 4 based on the reduced cost of installation and 5 external recommendations to avoid any potential 6 environmental release of combustible dust 7 particulates or fire into areas near residential 8 homes. 9 The explosion suppression system would 10 actuate and inject sodium bicarbonate via an 11 independent suppression container and chemical 12 isolation container located at the two injection 13 points that I mentioned earlier. In this 14 depiction here we can see the explosion 15 suppression container was located directly into 16 the hopper and the nozzle was directed into the 17 hopper and actuated when the incident occurred. 18 Here we have a view of the chemical isolation 19 dispersing right there on the inlet stream to the 20 dust collector. 21 US Ink/Sun Corporation provided the 22 information for the manufacture of the explosion

(202) 234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. 76 1 suppression and isolation system including 2 specification of the raw materials utilized in 3 the black ink pre-mix process, flash points of 4 oils and the normalized rate of pressurized or 5 Kst values for solid ingredients. 6 The new dust collection system for the 7 pre-mix room was commissioned for service on the 8 morning of Friday, October 5th, 2012, and then 9 operated until the end of the production shift at 10 3:00 p.m. At commissioning US Ink employees 11 would operate the system. Several black ink 12 production supervisors and one of the day shift 13 operators received a 15-minute operational 14 training and instruction as well as a walk- 15 through of the explosion suppression and 16 isolation system. 17 The dust collection was designed to 18 start automatically when any of the mixing tank 19 modules were engaged and to automatically shut 20 off after a specified delay when all mixers were 21 shut off. However, the dust collection system 22 continued to run overnight even when all the ink

(202) 234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. 77 1 mixers were shut off. 2 On Saturday, October 6th, 2012 the 3 plant maintenance employees used housekeeping 4 connections on the dust collection system to 5 vacuum dust and debris into the pre-mix room. At 6 the end of housekeeping activities the dust 7 collection system was manually shut down by a 8 maintenance employee. The mixing tanks and the 9 dust collection system were restarted on the 10 Monday night shift, October 8th, 2012, in 11 preparation for production runs scheduled for 12 Tuesday, October 9th, 2012. 13 On Tuesday morning, October 9th, 2012, 14 black ink production continued. The batch in T- 15 306 was completed and the pre-mix room operator 16 emptied the tank. At about 1:00 p.m. the pre-mix 17 room operator was loading Gilsonite into the bag 18 dump station when he heard a strange noise from 19 T-206. Because of the odd noise the operator 20 went to the control room to check the mixing tank 21 temperature and speed to confirm that the 22 equipment was working properly. As he left the

(202) 234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. 78 1 control room, he saw a flash fire originating 2 from the bag dump station where he had just been 3 working. The employee immediately proceeded in 4 the opposite direction to the pre-mix room to his 5 supervisor's office to alert him of the fire. 6 At about the same time other workers 7 heard a loud thump that shook the building. In 8 response to the flash from the bag dump station 9 and the subsequent loud thump, workers 10 congregated at the entrance of the pre-mix room. 11 Employees stated that the rubberized spiral-wound 12 duct tape duct hose material that connected T-306 13 to the dust collection riser appeared to be 14 melting and dripping onto the tank. 15 And here we have a view of the pre-mix 16 room again. And you'll note that the operator, 17 when he heard the noise, it was emanating from 18 this T-206. He went into this control room to 19 check his readings, and as he came out of this 20 door observed a flash from this bag dump station. 21 And at that point he proceeded to notify his 22 supervisor of the event.

(202) 234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. 79 1 Another employee who approached the 2 pre-mix area noticed the lights on the alarm 3 panel were red indicating that a pressure rise 4 had been detected and that the system had 5 activated. The employee alerted other workers in 6 the area that the explosion suppression had 7 activated and there was a fire. 8 In addition to the initial fireball 9 from T-306 witnesses observed a thick black cloud 10 venting into the corridor just ahead of the 11 fireball and reported an audible "whoosh." These 12 observations are consistent with the sights and 13 sounds of a combustible dust deflagration. A 14 deflagration is the propagation of a flame 15 through a fuel air mixture at a speed below the 16 speed of sound. It could be either a flash fire 17 or an explosion depending on the level and 18 consequences of the pressure generated during the 19 flame propagation. 20 Observation by CSB investigators of 21 the ceiling of the US Ink East Rutherford 22 facility shortly after the incident indicated

(202) 234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. 80 1 that the outward L-shaped path of the fireball 2 along the corridor near the pre-mix room. 3 The large flash fire and heated dust 4 mixtures that originated from above T-306 and 5 propagated into the corridor from the entrance of 6 the pre-mix room caused all employee burn 7 injuries. The injured employees had clothing 8 covered in black dust and they experienced burns 9 to exposed skin. Some burns resulted after the 10 clothing ignited from the fireball. The injuries 11 consisted mostly of burns to the upper torso, 12 arms, necks and heads. Other employees helped 13 the injured employees out of the plant and 14 emergency responders transported the injured to 15 hospitals. One of the injured employees was 16 wearing a short-sleeved T-shirt that day and 17 sustained third-degree burns on his left arm, 18 neck and upper torso. The employees were not 19 wearing flame-resistant clothing, or FRC. 20 I will now turn over the fire 21 department and emergency response section of this 22 presentation to Mr. Corona.

(202) 234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. 81 1 INVESTIGATOR CORONA: Thank you, Mr. 2 Banks. 3 The flash fire triggered the fire 4 sprinkler system in the pre-mix room which in 5 turn notified the local fire department. Fire 6 fighters and other first responders arrived at 7 the scene of the incident within three minutes of 8 the first alarm. 9 After they arrived and entered the 10 plant, members of the East Rutherford Fire 11 Department did not see any flames in the pre-mix 12 room because the sprinklers had extinguished any 13 fires outside of the enclosed equipment. 14 Although they observed no visible signs of flames 15 after the large flash event at Tank 306, 16 responding fire fighters reported that after 17 checking with their heat sensors several duct 18 work fires were detected. The fire fighters 19 separated the affected ducts and extinguished the 20 fires with water. The fire fighters also went up 21 to the dust collector on the roof and opened the 22 four covers but did not need to extinguish any

(202) 234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. 82 1 fires inside the dust collector itself. 2 Three distinct events occurred during 3 this incident: First, an employee observed a 4 flash originating from the bag dump station. The 5 bag dump station is located right down here on 6 this graphic. This attracted the attention of 7 several workers in the area. At about the same 8 time workers heard a loud thumping sound from 9 above, later concluded to be the activation of 10 the isolation and suppression canisters. The 11 isolation and suppression canisters are located 12 right here and right here. 13 This sound was accompanied by a pulse that 14 shook the entire building drawing more workers 15 from their respective work places to investigate. 16 After about two minutes seven workers 17 observed an approximately one-foot flame directly 18 over tank 306. The flame was observed in this 19 duct work right above tank 306. The flame then 20 gained additional energy from the powdery mixture 21 of accumulated carbon black, Gilsonite and clay 22 in the duct work. This mixture acted as fuel and

(202) 234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. 83 1 caused the flame to flash over the assembled 2 workers who were standing in the doorway of the 3 pre-mix room. 4 The CSB investigated three possible 5 points of origin of the fire: within the dust 6 collector, within the duct work above tank 306 7 and within tank 306 itself. From the evidence 8 obtained and examined the CSB concludes that the 9 fire originated within the duct work of the dust 10 collection system. 11 After an extensive investigation the 12 CSB concluded that the explosion and flash fires 13 occurred due to the self-heating and spontaneous 14 ignition of accumulated sludge-like material and 15 powdery dust mixture of Gilsonite, carbon black 16 and clay in the duct work above tank 306. 17 Several factors contributed to this ignition 18 including the uncontrolled heating of the mixing 19 tanks and the continuous operation of the dust 20 collection system for several hours after 21 commissioning. 22 Despite having temperature gauges and

(202) 234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. 84 1 recorders there were no temperature controls on 2 the mixing tanks. Additionally, the ink mixing 3 process design did not prescribe any safe 4 temperatures. The continuous operation of the 5 dust collection system for several hours after 6 commissioning continued to draw condensable 7 vapors into the duct. As a result, the dust 8 collector drew air into the duct, enhancing 9 combustion of the condensed vapors and 10 combustible dust. 11 With the dust collection system still 12 in operation the air within the system blew the 13 dust mixture towards the collector while the fire 14 burned. This caused ignition and a pressure rise 15 in the dust collector which was already filled 16 with a blend of Gilsonite, clay and carbon black. 17 Although the ignition led to a dust explosion 18 within the dust collector, the pressure rise 19 activated the explosion suppression system. The 20 pressurized discharge of the explosion 21 suppression canisters caused the thumping sound 22 employees heard below.

(202) 234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. 85 1 The sequence of events taking place in 2 the dust collection system is illustrated by the 3 following graph which was created using data 4 pulled directly from the dust collector post- 5 incident. It is important to note that the rapid 6 rise in pressure and suppression of the explosion 7 within the dust collector all took place in less 8 than one-half of one second. 9 Right here on the graph we can see a 10 slight increase in pressure before there's 11 ignition inside the dust collector. Right here 12 we can see a rapid increase in pressure which is 13 indicative of an explosion inside the dust 14 collector. Approximately 15 milliseconds after 15 the explosion it is detected and the isolation 16 and suppression canisters are activated. This 17 activation accounts for the thumping sound heard 18 by employees below. Approximately 30 19 milliseconds after the explosion is detected, it 20 is suppressed and we can see a decline in 21 pressure back down towards normal operating 22 levels.

(202) 234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. 86 1 The designed maximum pressure for the 2 dust collector was 3.8 pounds per square inch, or 3 psi, but on the day of the incident the maximum 4 pressure rose to 4.4 psi. As you can see from 5 the graph, the discharge of the suppression 6 isolation canisters created a pressure spike. 7 This caused the flame front to propagate counter- 8 current back down the duct work. The flame 9 traveled towards the mixing tanks and triggered 10 an initial flash fire at the bag dump station and 11 within the rubberized ducts above tank 306 where 12 the second more volatile flash fire occurred. 13 The CSB inspected the interior of 14 various duct work sections and took material 15 samples from six different sections of duct work. 16 These inspections revealed large accumulations of 17 both burned and unburned materials. Most of the 18 accumulations appeared to be black sludge-like 19 material. The CSB collected these samples for 20 further chemical composition analysis and testing 21 to develop possible ignition scenarios. 22 One of the tests conducted by the CSB

(202) 234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. 87 1 was to determine how explosible and severe the 2 dusts where that were involved in the incident. 3 The Kst value of a dust is the rate of pressure 4 rise and is essentially a measure of 5 explosibility. This value is measured in bar 6 meter per second. 7 US Ink provided data regarding 8 chemicals in the ink making process to the 9 manufacturers of the explosion suppression 10 isolation system. This data provided by US Ink 11 included a Kst value of 165 bar meter per second 12 for Gilsonite. As you can see from this chart 13 the Kst values for the two Gilsonite samples 14 collected by the CSB were higher than the 165 Kst 15 value the system was designed to handle. These 16 tests results indicate that Gilsonite is a faster 17 burning dust that is more prone to deflagration 18 and explosion and presented a greater challenge 19 to the explosion protection system than it was 20 originally designed for. 21 The next portion of our presentation 22 will examine issues related to the engineering

(202) 234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. 88 1 design analysis of the dust collection system and 2 my colleague Dr. Samuel Oyewole will lead this 3 section of the meeting. 4 INVESTIGATOR OYEWOLE: Thank you very 5 much, Mr. Mike Corona. The CSB performed an 6 engineering design analysis of this incident and 7 believes that excessive accumulation of 8 combustible material in the duct work was the 9 causal factor responsible for this incident. The 10 duct work accumulation was the foil for the 11 primary deflagration. 12 Also, improper design and operation of 13 the new dust collection system was the major 14 contributing factor that led to the October 9, 15 2012 incident. The dust collection system 16 operated at low conveying velocity and low F-flow 17 rate. While excessive amounts of dust and 18 condensable vapors were pulled into the duct 19 work, most of the accumulated dust settled 20 without getting conveyed up to the dust collector 21 on the roof top. 22 The CSB identified eight major design

(202) 234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. 89 1 issues which contributed to material accumulation 2 and low system performance. 3 Design Issue 1. Excessive amounts of 4 condensable vapors and dust was pulled into the 5 duct work. The air bleed, as you can see in 6 these photos, were attached to each tank head 7 space. This air bleed operated uncontrolled. As 8 a result, it continued to pull air which led to 9 conveying of excessive amounts of condensable 10 vapors and dust mixture from the mixing tanks to 11 the ducts during the operation of the dust 12 collection system. 13 Design Issue 2. The CSB found that 14 excessive amounts of dust was accumulated from 15 the housekeeping activity. The housekeeping 16 vacuuming activity that was done on Saturday, 17 October 6th, 2012 did not help matters. As you 18 can see in the middle image here, within a short 19 time cleaning ducts were plugged just after on 20 one housekeeping activity. The vacuuming 21 activity contributed additional dust to the duct 22 work, but did not have enough makeup air to

(202) 234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. 90 1 convey the picked-up dust to the dust collector 2 on the roof top for recycling. 3 Design Issue 3. The CSB found that 4 the dust collection system design was based on 5 low conveying velocity and F-flow rates. This 6 led to the accumulation of dust, oily sludge and 7 condensable vapor in the ducts. The American 8 Conference of Governmental Industrial Hygienist's 9 "Industrial Ventilation Manual of Recommended 10 Practices for Design" states that if solid 11 particulates or condensable vapors have been 12 transported through a system, a minimum velocity 13 is required. 14 The American Conference of 15 Governmental Industrial Hygienists, ACGIH, is a 16 professional association of industrial hygienists 17 one of whose objective is to advance worker 18 protection by providing scientific information 19 such as manuals, guides and recommendations on 20 occupational and environmental health issues. 21 The CSB found that the engineers 22 responsible for the design of the dust collection

(202) 234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. 91 1 system failed to ensure that the interior of the 2 duct work was clean and free of accumulated 3 material. The National Fire Protection 4 Association, NFPA, produces more than 300 codes 5 and standards intended to minimize the 6 possibility and effects of fire and other risks. 7 One of such standards is the NFPA 654 8 standard for the prevention of fire and dust 9 explosions from the manufacturing, processing and 10 handling of combustible particulate solids. The 11 2006 edition recommends that all duct work shall 12 be sized to provide the air volume and air 13 velocity necessary to keep the duct interior 14 clean and free of residual material. 15 The design conveying velocity of the 16 US Ink dust collection system was 1,150 feet per 17 minute, as you can see in the chart here. 18 However, the American Conference of Governmental 19 Industrial Hygienists, ACGIH, recommends the 20 minimum dust conveying velocity of 4,500 feet per 21 minute for average industrial dusts like the type 22 used at US Ink. The designed dust collection

(202) 234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. 92 1 system conveying velocity of 1,150 feet per 2 minute was approximately 25 percent inefficiency 3 when compared to the ACGIH recommended velocity 4 of 4,500 feet per minute. 5 The fourth design flaw was the non- 6 consideration for effective return of recycling 7 dust into the system. The dust collector hopper, 8 as you can see here in this picture, accumulated 9 approximately 138 pounds of dust mixture within 10 the first day of operation. The dust collection 11 return line accumulated additional 184 pounds. 12 This all combined for approximately 322 pounds of 13 dust which was accumulated within less than two 14 days of operation. 15 The dust return line design did not 16 thoroughly consider the physical nature of 17 chemical composition of the returning dust 18 mixture into the ink manufacturing process. If 19 this incident had not stopped the operation of 20 the process, the dust collector would have been 21 plugged within a few more days of operation. 22 The fifth major design issue was the

(202) 234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. 93 1 excessive accumulation of material in the duct 2 work due to low minimum conveying velocity. The 3 images shown above here reveal the amount of 4 powdery dust mixtures and sludge-like material 5 accumulation in several duct work within less 6 than two days of operation. 7 Design Issue 6 was the lack of 8 adequate system checkup at commissioning of the 9 dust collection system. The US Ink/Sun Chemical 10 over-relied on the outside contractors that 11 performed all construction and installation of 12 the new dust collector without checking on the 13 performance efficiency of the installed system 14 before accepting it. Upon accepting the dust 15 collection system US Ink did not perform any on- 16 site risk and hazard assessment or testing for 17 effectiveness before starting up the new dust 18 collection system to determine the effectiveness 19 of performance of the newly installed system. 20 Best practices required that initial 21 system testing be conducted to verify the system 22 meets the target performance parameters. For

(202) 234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. 94 1 example, the National Fire Protection Association 2 standards, NFPA-91 standard for exhaust systems 3 for air conveying of vapors, gases, mists and 4 non-combustible particulate solids, the 2010 5 edition, and NFPA-654 standard for the prevention 6 of fire and dust explosions from the 7 manufacturing, processing and handling of 8 combustible particulate solids, 2006 edition, 9 both recommend this type of initial system 10 testing. However, this was not the case at US 11 Ink. 12 Section 10.3.1 of the Annex of the 13 National Fire Protection Association Standard 14 NFPA-91 specifies this recommendation that when 15 installing a new system has been completed, the 16 system shall be tested to demonstrate performance 17 before acceptance by the user. The Annex 18 paragraph 8.10.3 provides a list of required 19 system tests including the following: 20 Measurement of the air volume; determination of 21 pressure drops across all components; recording 22 of the test data and design specifications; and

(202) 234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. 95 1 finally, comparing the obtained test data with 2 design specifications to determine whether system 3 alterations or adjustments are necessary to meet 4 specifications. The CSB found that none of the 5 recommended system tests items specified by NFPA- 6 91 as indicated above was performed by US Ink. 7 The seventh major design issue was the 8 lack of system controlling parameters for 9 operators to monitor performance and detect 10 system degradation. The CSB found that although 11 the US Ink dust collection system had some remote 12 indicators of system performance, there were no 13 information available on any of the pressure 14 gauges or other pressure devices near the mixing 15 tanks or at the bag dump station to warn the 16 operators of any performance problem. For 17 example, there was no way the operator would know 18 if there was any accumulation of material in the 19 duct work. 20 The last major design issue, No. 8, 21 the CSB found that inefficient ineffective system 22 fire protection was responsible for the incident

(202) 234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. 96 1 that occurred on October 9, 2012. Some chemical 2 design engineers offered ineffective fire 3 protection for the dust collection system. The 4 newly installed dust collection system was not 5 designed to prevent or extinguish fires. Several 6 aspects of the dust collection system designed 7 showed limited concentration for the likely event 8 of a fire incident even though combustible 9 materials were being transported within the dust 10 collection system. 11 For example, the US Ink mixing tanks 12 were equipped with flexible hoses of lengths 6 to 13 8 feet within the duct work and about 8 to 10 14 feet along the back of the bag dump station. 15 Recommended best practice suggests using flexible 16 hoses only to aid mobility of moving parts or 17 equipment and making length as short as possible, 18 usually not more than three feet. US Ink 19 employee testimonies revealed that the rubberized 20 flexible hoses were the first part of the system 21 to fail when the duct fire started. 22 Although the explosion suppression and

(202) 234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. 97 1 chemical isolation system attached to the dust 2 collector stopped an explosion, it was not 3 designed to extinguish fires. Best practices 4 recommends the inclusion of automatic fire 5 extinguishing systems such as internal sprinklers 6 in the duct work of dust collection systems. 7 CSB inspection of the ducts after the incident 8 revealed that larger ducts with cross-sections of 9 more than 75 square inches, about 9 inches in 10 diameter, did not have an automatic fire 11 extinguishing system. 12 CSB investigations revealed that US 13 Ink engineers and third party loss prevention and 14 risk management consultants hired by US Ink/Sun 15 Chemical considered the inclusion of internal 16 sprinkler protection and explosion venting within 17 the dust collector, but ultimately decided 18 against the inclusion of sprinklers due to the 19 installation of the explosion suppression and 20 chemical isolation system, as well as due to cost 21 effectiveness purposes. 22 The National Fire Protection

(202) 234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. 98 1 Association Standard NFPA-91, the standard for 2 exhaust systems for air conveying of vapors, 3 gases, mists and non-combustible particulate 4 solids, the 2010 edition, specifies the provision 5 of an automatic extinguishing system for portions 6 of duct work that are greater than or equal to 75 7 square inches. Incorporating sprinklers or some 8 other extinguishing systems into the larger duct 9 might have helped minimize or prevent the 10 occurrence of the flash fires on the day of the 11 incident. 12 US Ink focused its attention on 13 protecting just the dust collector at the roof 14 top with the explosion suppression and isolation 15 system. US Ink did not make additional effort to 16 protect or isolate other components of the dust 17 collection system and the equipments used in the 18 black ink manufacturing process such as the three 19 mixing tanks, the various sections of the ducts 20 and the bag dump station. This protection might 21 have likely prevented the flash fires and most 22 likely the employee injuries that resulted as a

(202) 234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. 99 1 result of the flash fires. If the explosion 2 suppression and chemical isolation system had 3 failed to stop the explosion in the dust 4 collector like it did on the day of the incident, 5 this incident will have been more severe. 6 At this point I'd like to turn over 7 the system management analysis section of this 8 presentation to my colleague Ms. Reepa Shroff. 9 Thank you. 10 INVESTIGATOR SHROFF: Thank you, Dr. 11 Oyewole. 12 This section discusses the analysis of 13 US Ink's safety management of the dust collection 14 system. Sun Chemical Corporation management 15 personnel did not have adequate oversight of the 16 planning, design, installation and commissioning 17 of the dust collection system. The CSB 18 identified significant management issues 19 including inadequate project oversight, 20 ineffective hazard communication and emergency 21 response planning, ineffective employee training 22 on the dust collection system, and failure to

(202) 234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. 100 1 develop and implement corrective actions 2 resulting from a previous incident. 3 I will now discuss a few details of 4 how the project was managed. Before design of 5 the new dust collection system the engineering 6 team filed a capital appropriations asset 7 request, or a CAAR, which allowed for plant and 8 corporate-level approval. The CAAR is required 9 under Sun Chemical project management policy and 10 was designed so that Sun Chemical could approve 11 or reject projects electronically and be able to 12 reference information in the future. The CAAR 13 indicated a process hazard analysis, or PHA, or 14 management of change, MOC, was not considered. A 15 process hazard analysis is a way to identify and 16 evaluate hazards associated with chemical 17 processes and operations to enable their control, 18 while an MOC is a written process to implement 19 changes to technology or equipment in a process. 20 During interviews with company 21 engineers and senior management CSB investigators 22 learned that the engineering team considered

(202) 234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. 101 1 installation of the dust collection system as a 2 replacement in kind for the old wet scrubber 3 system and therefore did not complete a PHA or 4 MOC. The new system was completely different 5 from the old wet scrubber system with different 6 functions and different design specifications, so 7 they thought they were exempt from developing and 8 following written procedures to manage the 9 changes to the new system. 10 In addition, US Ink/Sun Chemical 11 management did not seek a building permit for a 12 completely new process because they failed to 13 acknowledge that a PHA was required under US Ink 14 policy for the new process. If a PHA had been 15 conducted, this would have triggered additional 16 safety considerations including the need to 17 obtain a building permit. 18 CSB interviews with the US Ink 19 engineers revealed that US Ink/Sun Chemical 20 Corporation lacked an effective process for 21 management of organizational change. No 22 procedures were allowed for transferring and

(202) 234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. 102 1 retaining design knowledge and forwarding 2 information to the new engineer. A senior 3 engineer who retired from US Ink before the 4 project was completed coordinated the design of 5 the dust collection system. Upon his retirement 6 another US Ink engineer and an engineering 7 contractor assumed oversight of the project. 8 Although not fully involved in initial design of 9 the dust collection system, the new engineers 10 completed contractor hiring and equipment 11 ordering and oversaw installation of the system. 12 There is no record of adequate communication of 13 transitional knowledge concerning the hand over 14 the dust collection system from the retired 15 senior engineer to the new engineers. 16 Outside contractors who were not fully 17 involved in the design concept of the dust 18 collection system performed all construction and 19 installation activities for the new system. The 20 engineers who designed the dust control system 21 did not observe the actual installation process 22 for the system.

(202) 234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. 103 1 The US Ink hazard communication and 2 emergency response plan required a designated 3 fire coordinator to announce the presence of a 4 fire, location of the fire and to pull the fire 5 alarm. The plant did not require that employees 6 attempt to control a fire with an extinguisher 7 after a manually triggered fire alarm was pulled. 8 Rather, the plan required them to evacuate the 9 building immediately. During this incident no 10 fire alarm was pulled and employees attempted to 11 extinguish the fire. Employees did not evacuate 12 until after the injuries were sustained. 13 Although the sprinkler system in the 14 pre-mix room was connected to an automatic 15 audible alarm which was relayed to the East 16 Rutherford Fire Department, there was no record 17 that the automatic fire alarm provided adequate 18 notification to employees, if any. And effective 19 automatic fire alarm would have immediately 20 notified employees of the flash fires and 21 triggered and immediate evacuation. 22 Witness interviews revealed that

(202) 234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. 104 1 although training and fire drills were 2 occasionally conducted, the existing emergency 3 response plan was not followed on the day of the 4 incident. Fire hazard and emergency training 5 received by plant employees was inadequate. 6 The limited training provided to 7 employees did not adequately prepare them to 8 address a malfunction of the dust collection 9 system. After the initial start-up a 15-minute 10 meeting was held by the system manufacturer where 11 a walk-through of the dust collection system and 12 a brief interpretation of visual indicators was 13 provided. The meeting did not include 14 information on how the dust collection system was 15 designed to work and how to troubleshoot the 16 problems. 17 In addition, US Ink did not develop a 18 fire or explosion incident prevention program to 19 reenforce employee understanding of the potential 20 hazard severity associated with the newly 21 installed dust collection system. There was also 22 now way for pre-mix room operators to determine

(202) 234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. 105 1 if there were changes in performance of the 2 system. 3 A similar fire incident involving 4 ingredients overheating in a mixing tank occurred 5 at the US Ink East Rutherford facility on 6 February 29th, 2008. The East Rutherford Bureau 7 of Fire Safety and the East Rutherford Fire 8 Department responded to the fire incident at the 9 US Ink facility. According to the Bureau of Fire 10 Safety the duct work at the top of the tank was 11 consumed by flames generated during the fire. An 12 employee attempted to suppress the fire with a 13 fire extinguisher, but after failing to do so 14 exited the building. Fire fighters extinguished 15 the fire and there were no injuries from this 16 incident. 17 US Ink did not address any lessons 18 learned from this previous by discouraging 19 employees from attempting to extinguish fires in 20 an environment with flammable vapor and 21 combustible dust. In addition, US Ink did not 22 install temperature indicators and temperature

(202) 234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. 106 1 interlocks that would activate when the 2 temperature from the ink mixing operation became 3 too high. 4 I will now turn over this presentation 5 to my colleague Ms. Rachael Gunaratnam to discuss 6 the CSB's findings on regulatory analysis. 7 INVESTIGATOR GUNARATNAM: Thank you, 8 Ms. Shroff. 9 This section discusses the regulatory 10 framework that applied to the US Ink East 11 Rutherford facility. As we just discussed it was 12 the presence of combustible dust mixing with 13 flammable materials inside the dust collection 14 system at US Ink that led to a series of events 15 that burned the seven workers on October 9th. 16 US Ink is not the first accident 17 involving combustible dust that the CSB has 18 investigated. The CSB has been investigating 19 combustible dust incidents since 2003 when three 20 catastrophic dust incidents occurred that year 21 and claimed the lives of 14 workers. 22 The CSB launched a study and found

(202) 234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. 107 1 that combustible dust was not well regulated 2 though there were voluntary industry standards 3 that existed to prevent dust explosions and 4 fires. As a result, in 2006 the CSB recommended 5 to the U.S. Occupational Safety and Health 6 Administration, or OSHA, that it develop a 7 general industry standard for combustible dust. 8 The CSB recommendation to OSHA calls 9 for the agency to issue a standard designed to 10 prevent combustible dust fires and explosions and 11 to base the standard off of industry standards 12 like NFPA-654. Currently companies who handle 13 combustible dust like US Ink are not required to 14 follow these industry standards unless it is 15 required by the state in which the facility is 16 located. Without a standard OSHA is unable to 17 effectively regulate combustible dust hazards. 18 Their only mechanism to regulate these type of 19 hazards is to use the general duty clause which 20 is not as effective as an actual combustible dust 21 standard. 22 Here is a timeline of steps taken to

(202) 234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. 108 1 develop a combustible dust standard. In November 2 2006 the CSB made the original recommendation to 3 OSHA To develop a combustible dust rule. Three 4 years later in April 2009 OSHA announced it had 5 begun rulemaking. In September 2009, after the 6 CSB completed another combustible dust 7 investigation, the agency recommended that OSHA 8 proceed expeditiously with the dust rule. In 9 April 2010 OSHA called the dust standard long- 10 term action, but postponed some of the next steps 11 of the rulemaking process. In June 2012 OSHA 12 stated it cannot commit to a date for the 13 proposed rule, but it remains a top priority for 14 the agency. Most recently, in November 2014, 15 OSHA maintained the status of the rule as long- 16 term action on its agenda further delaying the 17 issuance of the rule. 18 The CSB continues to track and 19 investigate serious combustible dust accidents. 20 The CSB has identified 50 combustible dust 21 incidents that occurred before 2008 to 2012 which 22 resulted in 29 deaths and 161 injuries. Of those

(202) 234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. 109 1 50 incidents the CSB investigated 4 major 2 accidents. 3 First, in 2008 a combustible dust 4 explosion occurred at the Imperial Sugar 5 Manufacturing facility in Port Wentworth, Georgia 6 which killed 14 workers and injured 36. Then in 7 2010 a combustible dust explosion occurred at the 8 AL Solutions scrap metal processing facility in 9 New Cumberland, West Virginia which killed three 10 workers and injured one. And in 2011 three 11 separate incidents involving metal dust flash 12 fires killed five workers at the Hoeganaes steel 13 and iron powder manufacturing facility in 14 Gallatin, Tennessee. And then there was a US Ink 15 incident in 2012. 16 As a result of these investigations 17 the CSB repeated the recommendation to OSHA to 18 promulgate a standard, however this 19 recommendation is still not implemented. Had 20 OSHA issued the standard soon after the initial 21 recommendation in 2006, many of the severe 22 combustible dust incidents that followed,

(202) 234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. 110 1 including the US Ink incident, may have been 2 prevented. 3 OSHA has made some efforts to identify 4 combustible dust hazards. For example, it 5 revised its hazard communication standard to 6 include combustible dust in its definition of a 7 hazardous chemical. This would require employers 8 to notify their workers of the hazards of 9 combustible dust. OSHA has also intensified its 10 inspections for industries that have combustible 11 dust hazards. 12 The agency initiated a Combustible 13 Dust National Emphasis Program, which is an 14 inspection program that targets industries that 15 have combustible dust hazards. This program 16 targets certain industries that either have an 17 accident history of combustible dust incidents or 18 have the potential for the risk of a combustible 19 dust incident. These industries are identified 20 by their North American Industry Classification 21 System code, or NAIC, which is the business 22 classification.

(202) 234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. 111 1 The NAIC code for US Ink is the 2 printing ink manufacturing code 325910, however, 3 this code is not found on OSHA's list. This 4 industry should be on the list to be regularly 5 inspected because they use combustible dust such 6 as carbon black as part of their ink 7 manufacturing process. 8 While the intent of the National 9 Emphasis Program is to prevent an accident from 10 occurring, the NEP also provides guidance on how 11 to inspect a facility post-accident where 12 combustible dust is suspected to be the cause. 13 After the October 9th incident at US Ink OSHA did 14 a post-accident inspection and classified this 15 accident as a dust explosion, however, OSHA did 16 not issue citations related to the faulty design 17 of the dust collection system, which the CSB 18 believes to be one of the root causes of the 19 accident. Without citations addressing the root 20 causes of an accident problems may go uncorrected 21 and accidents may reoccur. 22 The CSB continues to investigate

(202) 234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. 112 1 combustible dust incidents like US Ink and 2 advocates for a federal standard to demonstrate 3 the seriousness of this hazard. In a July 2013 4 public meeting the CSB voted to change the status 5 of the OSHA recommendation as an unacceptable 6 response for delaying the development of a 7 federal standard. The Board also voted in that 8 meeting to make combustible dust hazards its 9 first item in the CSB's Most Wanted Chemical 10 Safety Improvement Program. 11 In the absence of an OSHA standard 12 states must rely on their own regulations, but in 13 New Jersey no state agency regulates combustible 14 dust hazards. When US Ink began the construction 15 of the dust collection system they had to obtain 16 a number of permits. The company did obtain an 17 environmental permit under New Jersey's Air 18 Pollution Control regulations. This type of 19 permit required that the dust collection system 20 be able to control emissions to the outdoor 21 environment. This type of permit does not 22 regulate the safety of the equipment and prevent

(202) 234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. 113 1 a combustible dust fire and explosion. 2 US Ink was also required to obtain a 3 construction permit under New Jersey's Uniform 4 Construction Code, or UCC. This code is overseen 5 by the New Jersey Department of Community Affairs 6 which has the authority to promulgate or modify 7 the regulations of the UCC. This state agency 8 also provides guidance and technical assistance 9 to local building officials who enforce the UCC 10 in their jurisdiction. 11 New Jersey's UCC was promulgated in 12 1975 as a single mandatory construction code. 13 The intent, as stated in its own code provisions, 14 is to ensure the health, safety and welfare of 15 occupants or users of buildings and structures, 16 and they do this through the adoption of sub- 17 codes such as a building or electrical code 18 requiring companies to obtain a construction 19 permit. 20 US Ink was required to but did not 21 obtain a construction permit for the new dust 22 collection system because the company

(202) 234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. 114 1 misinterpreted the code thinking they were exempt 2 from its requirements. Therefore, local code 3 officials never learned of the new construction 4 of the dust collection system. 5 The CSB investigation found that New 6 Jersey only required a permit for the new 7 electrical and structural changes associated with 8 the construction of the dust collection system, 9 but not for the engineering design of the dust 10 collection system. The CSB found that the New 11 Jersey UCC actually exempts manufacturing, 12 production and process equipment from the permit 13 process. Because the dust collection equipment 14 at US Ink was being used as part of the ink 15 manufacturing process, it appeared to qualify for 16 this exemption. 17 An 1992 New Jersey notice provided an 18 interpretation of that exemption stating that 19 process equipment is often unique to its function 20 and designed beyond the reference standards in 21 the UCC. This makes it impractical or impossible 22 for code officials to review it in an appropriate

(202) 234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. 115 1 way. They do however review electrical, water 2 and sanitary connections to such process 3 equipment as these can affect public safety. At 4 that time there were no engineering or fire 5 protection standards referenced in the UCC, and 6 local code officials do need these standards to 7 appropriately inspect process equipment. 8 However, in 2010 New Jersey adopted an 9 amended form of the International Building Code 10 which is a model building code that is adopted 11 throughout most of the United States. This code 12 applies not only to the physical structure, but 13 also to the use and occupancy of the building and 14 includes the equipment inside the building. The 15 International Building Code references industry 16 standards that apply to specific occupancies 17 giving local code officials guidance on how to 18 inspect these buildings. For example, the 19 International Building Code requires that 20 buildings and structures that pose a deflagration 21 hazard or a hazard from accelerated burning from 22 materials such as combustible dust follow

(202) 234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. 116 1 reference standards such as NFPA-654. 2 If the dust collection at US Ink had 3 been covered under New Jersey's UCC, the 4 provisions of the International Building Code 5 would have applied. This would have required US 6 Ink and other facilities handling combustible 7 dust to design their equipment in accordance with 8 standards such as NFPA-654. 9 I will now turn to the investigation 10 key findings. 11 1) A flammable mixture consisting of 12 hydrocarbons and combustible dust accumulated in 13 the duct work during the start up of US Ink's 14 dust collection system. The mixture 15 spontaneously igniting leading to a series of 16 events that caused a flash fire burning seven 17 workers. 18 2) The original design of the dust 19 collection system was intended strictly for dust 20 collection, but was modified before commissioning 21 to include a housekeeping function. This also 22 caused insufficient flow rate and contributed to

(202) 234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. 117 1 an accumulation of a flammable mixture in the 2 duct system. 3 3) System controls such as temperature 4 and pressure indicators were not installed for 5 operators to monitor the mixing tanks and dust 6 collection system during start-up. This led to 7 the overheating of the flammable dust mixture 8 which accumulated in the duct work and ignited 9 above T-306. 10 4) US Ink/Sun Chemical Corporation did 11 not provide adequate oversight into the planning, 12 design, installation and commission of the dust 13 collection system. As a result, safety 14 management elements such as a process hazard 15 analysis and management of change procedures were 16 not conducted. 17 5) No processes were in place to 18 confirm adequate start-up or commissioning of the 19 dust collection system. As a result, the 20 blockage of the duct work went undetected and 21 design flaws were not revealed until after the 22 flash fire occurred.

(202) 234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. 118 1 6) US Ink's hazard communication 2 emergency response plan and other incident 3 prevention programs did not reenforce an 4 understanding of the potential hazard associated 5 with flammable vapors entering the dust 6 collection system and mixing with the combustible 7 dust. 8 7) US Ink/Sun Chemical Corporation did 9 not obtain a construction permit for the 10 installation of the new dust collection system. 11 8) No federal agency or state agency 12 in New Jersey regulates combustible dust hazards. 13 9) A comprehensive OSHA federal 14 regulation specific to combustible dust is needed 15 because the reliance on industry to voluntarily 16 comply with fire protection and engineering 17 standards is insufficient to control combustible 18 dust hazards. 19 10) OSHA did not include the NAIC code 20 for printing ink manufacturing 325910, the 21 industry classification code for US Ink, to its 22 list of industries in the combustible dust NEP.

(202) 234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. 119 1 OSHA inspectors refer to this list as guidance on 2 inspections for combustible dust hazards in their 3 region. 4 11) The New Jersey Uniform 5 Construction Code adopts the International 6 Building Code which does reference fire 7 protection and engineering standards for 8 facilities that handle combustible dust such as 9 NFPA-654, however, the UCC exempts certain 10 process equipment that could apply these 11 provisions. 12 12) The New Jersey Department of 13 Community Affairs conducts training for local 14 building code officials on some the NFPA 15 standards in the New Jersey UCC, but does not 16 provide training on relevant NFPA standards that 17 address combustible dust hazards. 18 I will now turn it over to Mr. Banks 19 who will discuss the recommendations. 20 INVESTIGATOR BANKS: Thank you, Ms. 21 Gunaratnam. 22 As a result of this investigation the

(202) 234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. 120 1 investigative team is proposing that the CSB 2 reiterate one of its previous recommendations to 3 the Occupational Safety and Health 4 Administration, or OSHA, and issue eight new 5 recommendations, two to OSHA, three to US Ink and 6 three to the New Jersey Department of Community 7 Affairs. 8 First, I will discuss recommendations 9 the staff proposes for reiteration. 10 The CSB continues to believe that the 11 OSHA general industry standard for combustible 12 dust is needed to prevent future tragedies caused 13 by dust explosions. Therefore, the staff are 14 proposing that the Board reiterate its 2006 15 recommendation calling for the development and 16 issuance of an OSHA general industry standard for 17 combustible dust. As Ms. Gunaratnam mentioned, 18 the Board voted to designate this recommendation 19 and three related recommendations with the status 20 open, unacceptable response in July of 2013. 21 The Board also voted at that time to 22 designate a general industry standard for

(202) 234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. 121 1 combustible dust as the agency's first most 2 wanted chemical safety improvement. It should 3 also be noted that this will be the first time in 4 the history of the agency that the CSB has 5 reiterated one of its safety recommendations. 6 The text of the reiterated 7 recommendation No. 2006-1-H-1 is as follows: As 8 an OSHA general industry standard for combustible 9 dust is needed to prevent future tragedies, the 10 CSB is reiterating its 2006 recommendation to 11 OSHA which is currently designated with the 12 status open, unacceptable response. A dust 13 standard is the first item on the CSB's most 14 wanted safety improvement list. This 15 recommendation was reiterated by CSB in the AL 16 Solutions investigation. So we have reiterated 17 this recommendation at the AL Solutions 18 investigation closing. 19 Now the new recommendations. We have 20 a recommendation to OSHA. R-1 is to add the 21 North American Industry Classification System, or 22 NAICS, Code 325910, printing ink manufacturing,

(202) 234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. 122 1 to the list of industries in Appendix D-1 or 2 Appendix D-2 of Combustible Dust NEP Program 3 Directive CPL-03-00-008. 4 Recommendation R-2 to OSHA. 5 Communicate with all OSHA area offices to 6 encourage appropriate application of the 7 following existing provisions of Combustible Dust 8 NEP Program Directive CPL-03-00-008, Paragraph 9, 9 Section (a)(2) which indicates that the area 10 offices may add their NEP establishment list to 11 those facilities in their jurisdiction with the 12 Standard Industrial Classification System Code, 13 or a NAICS code, or both, other than those listed 14 in Appendix D-1 and D-2 of the Combustible Dust 15 NEP Program Directive if those facilities have a 16 known pattern of combustible dust hazards. 17 Paragraph 9, Section (b)(4) indicates 18 that if a fatality or a catastrophe investigation 19 is performed at a facility because of a 20 combustible dust deflagration or explosion, the 21 inspector shall use the guidelines of the 22 Fatality Catastrophe Investigation Procedures

(202) 234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. 123 1 Directive CPL-02-007-137 and in Combustible Dust 2 NEP Directive CPL-03-00-008. 3 The first proposed recommendation to 4 the New Jersey Department of Community Affairs 5 reads as follows: "Revise the exemption for 6 manufacture, production and process equipment 7 under the New Jersey Uniform Construction Code, 8 NJAC 5:23-2.14 and require equipment that is not 9 already covered by a federal standard to be 10 covered under the New Jersey UCC. Also provide 11 authority to allow local code officials to 12 solicit third party certified professionals to 13 evaluate the type of equipment." 14 The second proposed new recommendation 15 to the New Jersey Department of Community 16 Affairs, R-4, is develop and implement training 17 for local code officials on the National Fire 18 Prevention Association, or NFPA, standards 19 referenced in the New Jersey adoption of the 20 International Building Code, or IBC, for 21 occupancies with a high-hazard classification of 22 group H. Specifically include training on

(202) 234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. 124 1 equipment that handles combustible dust and the 2 hazards involved. 3 The third proposed new recommendation 4 for the New Jersey Department of Community 5 Affairs, No. R-3, reads: "Promulgate a regulation 6 that requires all occupancies handling hazardous 7 materials to inform the local enforcement agency 8 of any type of construction or installation of 9 equipment in an industrial or manufacturing 10 facility. Also, require that the local 11 enforcement agencies evaluate that information to 12 determine whether a construction permit is 13 required." 14 The first proposed recommendation to 15 US Ink/Sun Chemical Corporation, R-6, reads as 16 follows: "At the US Ink East Rutherford facility 17 install automatic fire alarms consistent with 18 NFPA-72, or the National Fire Alarm Code, in 19 manufacturing areas such as mixing where heat 20 generation could occur." 21 The second proposed recommendation to 22 US Ink/Sun Chemical Corporation reads: "Revise

(202) 234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. 125 1 the capital appropriations request, or CAR, form 2 procedure for new installations and modifications 3 to existing equipment to require at a minimum the 4 following: Process hazard analysis, or PHA; 5 management of change, or MOC; review of 6 engineering drawings for permits; safety 7 management of contractors; training of plant 8 operators based on applicable dust collection 9 systems guidelines and standards including NFPA- 10 91 and NFPA-654." 11 And the last proposed recommendation 12 to the US Ink/Sun Chemical Corporation, R-8, is 13 develop and implement a management organizational 14 change protocol to allow for the transfer of 15 knowledge and information to new personnel. At a 16 minimum include initial or refresher training in 17 the following: Safety and health procedures, 18 lessons learned from previous incidents, 19 technical information for equipment and routine 20 plant operations. 21 Now this concludes the staff's 22 presentation of the CSB investigation of the US

(202) 234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. 126 1 Ink incident, and I will now turn the meeting to 2 CSB Chairperson Dr. Moure-Eraso. 3 CHAIRPERSON MOURE-ERASO: Thank you 4 very much, Mr. Banks. I think we'll proceed with 5 the agenda with Board questions to the 6 investigators. So I start with Mr. Ehrlich. 7 Mr. Ehrlich, do you have any 8 questions? 9 MEMBER EHRLICH: Yes, I have a couple 10 of questions. Well, it's a two-part question. 11 Was the source of ignition every identified and 12 was there adequate data to show that the system 13 was properly grounded to rule out possible static 14 discharge with all those hoses? 15 INVESTIGATOR BANKS: We were not able 16 to pinpoint the point of origin for the fire. 17 There were several indicators of where the fire 18 most likely occurred, an eyewitness recount of 19 his activity and the actions at the bad dump. 20 The equipment itself was properly grounded. 21 MEMBER EHRLICH: Okay. It was stated 22 clearly that the emergency response plan said

(202) 234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. 127 1 that they pull the alarm and evacuate the 2 facility. Who made the decision to send people 3 into fight the fire? Had they had previous fire 4 fighting training? 5 INVESTIGATOR BANKS: The alarm did not 6 go out to the entire building. As we understand 7 it could be heard in the control room. The 8 decision to attempt to extinguish the fire, the 9 gentleman took it upon himself to approach the 10 fire with an extinguisher and attempt to 11 extinguish the fire. There was fire emergency 12 training that was offered by the plant prior to 13 the incident. 14 MEMBER EHRLICH: And was there an 15 emergency coordinator involved in this whole 16 operation? 17 INVESTIGATOR BANKS: The emergency 18 coordinator is designated to be the supervisor, 19 and in this instance they were assessing the 20 fire, the flames that were observed in the pre- 21 mix room. And before they could evacuate the 22 flash fire washed over them. We feel that had

(202) 234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. 128 1 there been a louder alarm that all of the 2 employees could have heard, they would have more 3 likely evacuated. 4 MEMBER EHRLICH: I see. Thank you. 5 CHAIRPERSON MOURE-ERASO: Mr. Griffon? 6 MEMBER GRIFFON: Yes, just a couple 7 questions given the time of night here. I'm 8 curious just to maybe go over this or emphasize 9 this. I think you might have mentioned it in the 10 presentation, but was the company complying with 11 the current NFPA Standards 91 and 654 prior to 12 the incident? 13 INVESTIGATOR BANKS: As required under 14 those guidelines, yes. 15 MEMBER GRIFFON: Okay. And then so if 16 they were complying with those and the incident 17 still occurred, then did you identify any gaps or 18 deficiencies in those two standards, 91 or 654? 19 INVESTIGATOR BANKS: None that we were 20 able to bring to the fore in this case. 21 MEMBER GRIFFON: Okay. I mean, I'm 22 just trying to get a sense of if those standards

(202) 234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. 129 1 are in place and this incident still, happened it 2 seems something might be wrong with those 3 standards or it might need to be further 4 considered. That's all I'm exploring. 5 INVESTIGATOR BANKS: Okay. 6 MEMBER GRIFFON: Another question: 7 You mentioned in Finding 1 hydrocarbons and dust 8 being present, and I'm wondering if you classify 9 this as a hybrid incident, a hybrid dust/vapor 10 event. 11 INVESTIGATOR BANKS: There were 12 multiple possible causes for this event. You had 13 the oils that were used in the process, you had 14 the Gilsonite, the carbon black. They were all 15 possible contributors. The proximity of the 16 flames observed after the initial flash and the 17 subsequent sound and action on the roof. The 18 material that we found in the duct work 19 afterwards was a mixture of an oily powdery 20 substance that had adhered to the inner surfaces 21 of the duct work. So the attempt was made to 22 replicate some type of a hybrid incident in a

(202) 234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. 130 1 lab, and we weren't able to reproduce it to that 2 extent that we could say absolutely that it was a 3 hybrid event. 4 MEMBER GRIFFON: Okay. And did the 5 company in their planning prior to the incident 6 consider a potential for a hybrid situation? I 7 don't know if they considered that. I didn't 8 notice it in the report. 9 INVESTIGATOR OYEWOLE: We don't have 10 any record of that that the company actually did 11 any concentration -- 12 MEMBER GRIFFON: Okay. 13 INVESTIGATOR OYEWOLE: -- for the 14 hybrid type of mixture. 15 MEMBER GRIFFON: And the last question 16 is just we did some testing and I wondered if 17 prior to the incident if the company tested the 18 Gilsonite material or other materials for 19 combustibility. 20 INVESTIGATOR BANKS: Yes, they had 21 information that indicated the explosibility of 22 the material that had been tested prior to, and,

(202) 234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. 131 1 as we found afterwards in our tests, there was a 2 difference in the explosibility of that material. 3 MEMBER GRIFFON: Okay. And I assume 4 their results were below -- 5 INVESTIGATOR BANKS: A little bit 6 lower. 7 MEMBER GRIFFON: -- their design 8 specifications of 165 -- 9 INVESTIGATOR BANKS: Yes. 10 MEMBER GRIFFON: -- for the -- okay. 11 INVESTIGATOR BANKS: Yes. 12 MEMBER GRIFFON: All right. Thank 13 you. 14 INVESTIGATOR BANKS: You're welcome. 15 CHAIRPERSON MOURE-ERASO: Thank you. 16 I only have one question for the team. How 17 prevalent are those explosions and what specific 18 studies the CSB has done to find that prevalence? 19 INVESTIGATOR BANKS: Well, it's 20 extremely widespread and troubling and continues 21 to occur. There's a wide range of material 22 that's involved in these type of events from

(202) 234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. 132 1 pharmaceutical dust to sugar to metal to any 2 number of different powdery materials that are 3 combustible. And over the years we've conducted 4 a dust study that initiated in 2003, and 5 recommendations were issued in 2006 to address 6 that problem. Subsequent to that there have been 7 incidents at Imperial Sugar, at Hoeganaes, at AL 8 Solutions. The numbers of tragic outcomes from 9 these events is staggering. 10 In this incident the victims were 11 burned, but they could walk out on their own 12 afterwards, so it wasn't as bad as it could be. 13 But the problem is prevalent and the efforts of 14 this agency to address that have continued 15 throughout my tenure to try to be a voice of 16 reason that there is a profound need for some 17 type of comprehensive dust standard to provide a 18 greater sense of awareness of the risk, that's 19 more programmatic in how the inspections are 20 done, to give folks a sense that the material 21 that they're working with exactly how volatile it 22 is and to respect it.

(202) 234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. 133 1 CHAIRPERSON MOURE-ERASO: And if I 2 remember well, I guess we were able to follow in 3 a period of 10 years about 50 incidents with 4 fatalities. 5 INVESTIGATOR BANKS: That's correct. 6 Yes, 50 incidents with I think 29 fatalities. 7 CHAIRPERSON MOURE-ERASO: Thank you 8 very much. 9 INVESTIGATOR BANKS: Sure. 10 CHAIRPERSON MOURE-ERASO: Okay. I 11 think we've finished this part of the program, 12 and I am asking Dr. Horowitz if he could step 13 forward to moderate the public comments. 14 INVESTIGATOR BANKS: Mark, Just a 15 point of correction. They were not following 16 NFPA-654 at the site. So I mis-spoke on that. 17 My apologies. 18 MEMBER GRIFFON: Thank you. Yes, I 19 think that's important. 20 INVESTIGATOR BANKS: Yes. 21 MEMBER GRIFFON: That's for that 22 clarification, because it was a little concerning

(202) 234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. 134 1 to hear that if they were complying with all 2 these standards and it still happened, so -- 3 INVESTIGATOR BANKS: Yes. 4 MEMBER GRIFFON: Thank you. Thank 5 you. 6 INVESTIGATOR BANKS: Yes. Sure. 7 CHAIRPERSON MOURE-ERASO: But and you 8 call it a standard? Is that the correct 9 terminology? I think they are guidelines. 10 PARTICIPANT: Well, industry 11 voluntarily -- yes. 12 CHAIRPERSON MOURE-ERASO: Yes, it's a 13 guideline. Yes. 14 PARTICIPANT: A guideline. Yes, 15 right. 16 DR. HOROWITZ: Thank you, Mr. 17 Chairman. The first commenter is Bruce Johnson 18 (phonetic) from the International Code Council. 19 Mr. Johnson? 20 MR. JOHNSON: Good evening, Chairman 21 Moure-Eraso, Chemical Safety Board members and 22 staff. My name is Bruce Johnson and I'm the vice

(202) 234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. 135 1 president and government relations for the 2 International Code Council, or ICC. 3 ICC is a membership association 4 dedicated to building safety, fire prevention, 5 energy conservation and sustainability. The ICC 6 develops model building constructions code and 7 fire safety codes used to construct most 8 residential and commercial buildings and ensure 9 those buildings remain safe throughout their 10 useful life. It is the mission of the ICC to 11 provide the highest quality codes, standards, 12 products and services for all concerned with the 13 safety and performance of the built environment. 14 The family of correlated ICC codes, 15 called the I-Codes, undergo a triennial review 16 and revision process that is an open an 17 consensus-base code development forum. Our code 18 development process considers new building and 19 fire safety data and research reports, the latest 20 technology, installation techniques, new building 21 products and methods, along with cost and 22 affordability in producing published model codes

(202) 234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. 136 1 every three years. 2 Most U.S. cities, counties and states 3 that adopt codes choose the International or I- 4 Codes developed by the ICC. The 2009 5 International Building Code, IBC, and the 6 International Fire Code, IFC, with New Jersey 7 amendments are among the model codes adopted and 8 enforced by the State of New Jersey. The 9 International Building Code is a model 10 construction code that establishes minimum 11 requirements for a reasonable level of safety, 12 public health and welfare through structural 13 strength and stability, adequate occupant egress 14 and safety for occupants and fire fighters, as 15 well as the protection of property from fire and 16 other hazards attributed to the built 17 environment. 18 The International Fire Code, or IFC, 19 is a model construction and maintenance code that 20 establishes minimum fire safety levels for both 21 new and existing buildings. The intent of the 22 IFC establishes minimum requirements for all

(202) 234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. 137 1 commercial buildings consistent with nationally- 2 recognized good practice for providing a 3 reasonable level of occupant safety, property 4 protection from hazards of fire, explosion, 5 dangerous conditions, and also to provide for the 6 safety of fire fighters and emergency responders 7 during emergency operations. 8 The IBC and IFC are designed to work 9 together as a correlated system to address 10 minimum levels of safety for the construction of 11 new buildings and the maintenance of that minimum 12 level of safety for the life of the building. 13 ICC believes that the most effective 14 method for states to ensure their built 15 environment remains safe, sustainable, affordable 16 and resilient is through adopting up-to-date 17 model construction and fire safety codes and 18 having a system in place for the administration 19 and enforcement of those adopted codes for all 20 buildings. This includes compliance and 21 commissioning inspections of buildings as they 22 are being constructed and periodic inspections of

(202) 234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. 138 1 existing buildings for compliance with the IFC to 2 ensure the minimum required fire and life safety 3 levels are always maintained. 4 The IBC has specific construction 5 requirements for high-hazard occupancies and also 6 references the IFC for fire safety requirements 7 in these buildings. The IFC contains 8 requirements for the storage, use and handling of 9 all hazardous materials such as combustible dust 10 in both new and existing buildings including 11 those classified as high-hazard and other 12 manufacturing facilities such as factory or 13 storage occupancies. 14 Since the CSB investigation report and 15 recommendations based on the dust explosion at 16 the Hoeganaes facility in Gallatin, Tennessee 17 were released in 2011, new combustible dust 18 hazard mitigation requirements have been added to 19 the 2012 International Fire Code. The ICC Fire 20 Code Action Committee is continuing to develop 21 code change proposals for the 2018 IFC that 22 further address the mitigation of combustible

(202) 234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. 139 1 dust hazards and incorporation of IFC references 2 to applicable safety standards such as those 3 developed by the NFPA. 4 ICC has also taken steps to include a 5 specific focus on the hazards of combustible dust 6 in our training programs delivered to thousands 7 of code officials every year. These education 8 programs now include information and 9 illustrations of combustible dust hazards along 10 with an explanation of the IBC and IFC 11 requirements that address mitigation of those 12 hazards. It is our hope that this education of 13 code officials will improve the enforcement of 14 combustible dust safety requirements and thereby 15 help prevent combustible dust deflagrations and 16 flash fires. 17 In conclusion, the ICC would like to 18 thank the Chemical Safety Board for its thorough 19 accident investigation reports and the 20 recommendations that are essential to improving 21 safety of our built environment. ICC will 22 continue to work with the CSB to ensure that the

(202) 234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. 140 1 recommendations aimed at improving the safety 2 requirements of the I-Codes are considered in our 3 ongoing code development process. 4 I'd like to thank the Chemical Safety 5 Board for the opportunity to offer these comments 6 this evening and I would be happy to answer any 7 technical questions about the ICC or our model 8 codes. Thank you. 9 DR. HOROWITZ: Thank you, Mr. Johnson. 10 CHAIRPERSON MOURE-ERASO: Thank you 11 very much. 12 DR. HOROWITZ: Next is Ashley 13 (phonetic) Fitch, United Steel Workers. 14 Ms. Fitch? An could you please spell 15 your name for the transcriber? 16 MS. FITCH: Sure. F-I-T-C-H. Good 17 evening, Chairman, members of the Board. Thank 18 you for the opportunity to comment today. 19 My name is Ashley Fitch and I join you 20 on behalf of the United Steel, Paper and 21 Forestry, Rubber, Manufacturing, Energy, Allied 22 Industrial and Service Workers International

(202) 234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. 141 1 Union, more commonly known as the USW. We 2 represent 850,000 workers in the United States 3 and Canada. Our members work in sectors I just 4 mentioned above and in many others, including the 5 majority of unionized workers in the paper and 6 metal industry and hundreds of thousands of men 7 and women whose jobs expose them to combustible 8 dust hazards. 9 The explosion in 2012 at the US Ink 10 facility in East Rutherford, New Jersey injured 11 seven people. The lives of these workers are now 12 changed forever. They suffer more than just 13 physically. The occurrence at US Ink will affect 14 these victims and their families for the rest of 15 their lives. The severity of this explosion 16 could have been greater. The damage to this 17 community and its infrastructure could have been 18 more greatly altered due to a chemical dust 19 explosion or fire. 20 The USW does not represent the workers 21 at US Ink, however, we do represent many workers 22 who are today and every day exposed to

(202) 234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. 142 1 combustible dust hazards. USW members, just as 2 the workers of US Ink, are highly skilled and 3 highly trained workers who operate and maintain 4 various manufacturing facilities across the 5 nation. And to further protect these workers 6 there must be further regulation and awareness of 7 potential catastrophic explosions and fires to 8 occur due to this type of hazard. 9 We have worked closely with the 10 Chemical Safety Board and would like to take this 11 opportunity to strongly support the 12 recommendations related to the prevention of 13 combustible dust fires and explosions. We also 14 support the CSB's highlighting the need and 15 necessity of further regulation on the subject in 16 light of OSHA's failure to move forward with a 17 combustible dust standard. We encourage the CSB 18 to work collaboratively with OSHA to facilitate 19 the agency's progress on combustible dust to 20 protect workers across the country. 21 Since 1923 when the NFPA published the 22 first national consensus standard on the

(202) 234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. 143 1 prevention of dust explosions in grain and flour 2 mills these hazards associated with combustible 3 dust has not been unknown. In 2009 OSHA reported 4 that loss from these explosions of fires affected 5 350,000 companies across the nation. These 6 tragedies are becoming all too familiar for the 7 working men and women of this country. Each of 8 these accidents could have been prevented with 9 proper regulation to employers and regulations to 10 prevent these catastrophic accidents. 11 Today the Board has shared information 12 gathered during their inspection. These findings 13 provide lessons learned to all facilities within 14 this industry to prevent it from reoccurring, but 15 will the findings of this recommendation of the 16 CSB be enough to impact the risk of another 17 explosion or fire? No. Therefore, we strongly 18 urge the Board to continue to shed light on these 19 catastrophic accidents and draw attention to 20 these regulatory gaps. Thank you. 21 CHAIRPERSON MOURE-ERASO: Thank you. 22 DR. HOROWITZ: Thank you, Ms. Fitch.

(202) 234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. 144 1 Next is Paul Hofmann. And, Mr. 2 Hofmann, please spell your first and last name 3 for the recorder. Thank you. 4 MR. HOFMANN: Well, Paul is P-A-U-L. 5 And Hofmann is H-O-F-M-A-N-N, one F and two Ns. 6 I thank the Board for giving me the 7 opportunity to speak on behalf of my three 8 clients, two of whom are here. All three were 9 individuals that were burned, seriously injured 10 in the event at Sun Chemical's US Ink facility. 11 I have several comments that I wish 12 the Board to think about before it makes its 13 final vote on the report. 14 The first one is a comment that the 15 report unfortunately was released this afternoon 16 for me to be able to review, so I really didn't 17 have an adequate time to fully review it. From 18 my initial review, though, I do want to commend 19 the Board for the thoroughness of the 20 investigation. I would have liked more time to 21 have reviewed it, and I think that in the next 22 time that you have such a hearing, please give

(202) 234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. 145 1 the public a little bit more time to digest what 2 the proposed findings would be. 3 That being said, there is one area 4 that I do quarrel with on behalf of my clients 5 with a certain conclusion that was reached, and I 6 would like the members before you vote to 7 consider. 8 The conclusion is that the initial 9 flash fire and the thump that was heard was the 10 suppression and isolation system going off. I 11 don't think that the report fully justifies that 12 conclusion. An alternate explanation of the 13 thump that was heard could have been the actual 14 first initial flash fire that was observed coming 15 out of the bag dump and there's no justification 16 necessarily to conclude that the suppression and 17 isolation system went off at that time. 18 I think an alternate explanation would 19 be that the initial flash fire did initiate 20 further burning in the duct work and that since 21 the blower continued to draw air through the 22 system that embers from the smoldering fire in

(202) 234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. 146 1 the duct work then were drawn up into the dust 2 collector setting off an explosion in the dust 3 collector which the suppression and isolation 4 system then attempted to prevent. Unfortunately, 5 I think the conclusion could easily be reached 6 that the deflagration that came out of the dust 7 collector was not suppressed and was not isolated 8 as supposedly it was intended to be and that that 9 flame front that came out of the dust collector 10 is what burned my clients. 11 An alternate explanation is that in 12 that second and much more serious flame front 13 that burned my clients, that perhaps the system 14 did also go off and it was the isolation system 15 pushing in a back pressure situation the flaming 16 material from the duct work which burned my 17 clients rather than the suppression and isolation 18 system having gone off minutes before. And 19 before you make your final vote I think that 20 needs to be analyzed. 21 I think another important thing that 22 seems to be missing from the conclusions here is

(202) 234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. 147 1 you have a situation where this was a brand new 2 system; and it's mentioned numerous times in the 3 report that this was a new system, and this was 4 certainly in part poorly engineered as to the 5 duct work, etcetera, and I agree with that 6 conclusion. But I disagree with the total 7 emphasis on Sun Ink as being the progenitor of 8 the problems. 9 Sun Ink hired and involved numerous 10 contractors that were expert in the field of dust 11 collection. They hired the United Air Systems to 12 produce the dust collector itself. They hired 13 Fike (phonetic) and SSI (phonetic) to incorporate 14 a sensing system plus suppression and isolation. 15 They hired another contractor called Faber 16 (phonetic), which is an engineering firm, to 17 assist it. There is no mention about the four of 18 these entities working together. There is one 19 little footnote that mentions that there were 20 some other contractors. 21 And I think that a conclusion or a 22 recommendation from this Board must be that all

(202) 234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. 148 1 entities involved in the design and construction 2 of these dust collector systems must all analyze 3 the safety issues and not just rely on the 4 manufacturer, although that's an easy target. 5 But UAS, Faber, Fike, SSI all were involved in 6 the design of this system. They were also -- 7 they either were or should have been; and I 8 believe that they were, aware of the fact that 9 there were the volatile chemicals that were 10 involved and they did not take into account the 11 potential fire hazard and explosion hazard that 12 the volatile chemicals would also be involved. 13 And so, I think that there is a lack 14 in the proposed report as to who else should have 15 -- should have -- and the recommendation should 16 be that other entities should also be involved in 17 analyzing before a system is put into place. 18 Everyone that's involved in the design should 19 look at it from a safety standpoint, particularly 20 those entities that are recognized as experts in 21 the industry. 22 So I want to thank you for that and

(202) 234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. 149 1 hope that you consider my comments. 2 DR. HOROWITZ: Thank you. Next is 3 Professor Glenn Corbett. 4 PROF. CORBETT: It's Glenn Corbett, 5 two Ns and two Ts, for the recorder. 6 Mr. Chairman, members of the Board and 7 staff, thank you for allowing me to speak 8 tonight. I'm not sure what's going on next door, 9 but something's happening there. 10 Tonight just for the purposes of full 11 disclosure, I've worked for the Board as a 12 consultant on other projects. And also tonight 13 I'm not speaking on behalf of my college or the 14 New Jersey State Fire Code Council, which I sit 15 on. I'm speaking on my own behalf tonight. 16 I'd like to focus on a couple of the 17 recommendations, which by the way are incredibly 18 important. These are two excellent reports that 19 we heard tonight and the actual recommendations, 20 as we all know, are so crucial. 21 The first one is the gap that the 22 Board has identified in New Jersey's regulations

(202) 234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. 150 1 dealing with combustible dust. It's clear; we 2 heard from Bruce Johnson earlier, that the model 3 codes intend for jurisdictions who adopt their 4 codes to actually have a role in oversight and 5 inspection of these systems. These systems, 6 while they may play a role in terms of 7 environmental protection, they're also the code 8 enforcer there for obvious reasons in terms of 9 the potential for an explosion in the dust 10 accumulation scenario. In particular, the 11 exemption that New Jersey provides for these 12 systems has to be closed or should be removed. 13 We have to close that gap and get rid of that. 14 So again, I'd like to really strongly endorse 15 that particular recommendation. 16 Also the recommendation that's in the 17 existing codes for NFPA-654. It's a fire 18 protection standard. It's a standard for this 19 kind of situation. And of course it wouldn't be 20 there if it wasn't important to actually enforce, 21 right? So we shouldn't have something that's in 22 the code that we're going to exempt people from.

(202) 234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. 151 1 So that's important. 2 The other really important provision 3 in the recommendation you've made deals with the 4 issue of training. East Rutherford is a small 5 community. I also have to disclose I'm a 6 resident of this county, Bergen County, at the 7 north end. Sixty-nine communities. Sixty-nine 8 fire departments. We're all small towns. And a 9 lot of these communities don't have a lot of 10 technical expertise. 11 And I think it's important -- I think 12 Investigator Banks mentioned, which I think 13 perhaps should go in your recommendation 14 specifically, is that there should be 15 encouragement for local jurisdictions to use the 16 sections in the code that allow for special 17 expertise to be brought in at the behest of that 18 inspecting agency and paid for by the developer 19 or whoever is actually going to propose this 20 particular installation. That section in Chapter 21 1, Section 103 allows for again that special 22 expertise to be brought in, provide a report to

(202) 234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. 152 1 the local people to make sure that they 2 understand exactly what the system is going to do 3 and if there are any issues with that system 4 design they provide that independent expertise. 5 I've used it in my own career. I 6 spent 10 years in code enforcement in Texas, San 7 Antonio and Austin, and there are occasions where 8 none of us can know everything about everything, 9 right? So we brought in consultants to help us 10 understand on particularly complicated situations 11 what to do. And I think I would suggest that 12 that be put in the report specifically that 13 jurisdictions should be encouraged to use that 14 particular provision of the code. 15 So again, thank you all so much for 16 your hard work, both the Board and the staff. 17 And I'd also be happy answering questions later 18 on. Thank you. 19 DR. HOROWITZ: Thank you. Eric 20 (phonetic) Frumin, Change to Win Labor Coalition. 21 MR. FRUMIN: My name is Eric Frumin, 22 F-R-U-M-I-N. I'm the health and safety director

(202) 234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. 153 1 for Change to Win, which is a national labor 2 federation that includes the Teamsters Union and 3 several other unions. First, I just want to 4 express my feelings of -- well, regret for the 5 suffering that the workers at the US Ink have had 6 to endure and their families, and even the people 7 who weren't injured. I'm sure it continues to be 8 a difficult experience to go back there every 9 day. 10 I had a couple of questions about the 11 report and the investigation, and then I want to 12 say a little bit about the historical context for 13 some of the issues that we're dealing with today. 14 So I just want to confirm what year 15 the change in the system was implemented. I 16 don't actually see that in the report, so it's 17 not clear. What year was the CAR approved and 18 therefore what were the applicable voluntary 19 standards in NFPA? What version of them were 20 applicable at the time? So do you know what year 21 the change was done? 22 INVESTIGATOR BANKS: Well, we don't

(202) 234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. 154 1 have that information at our fingertips. We're 2 happy to get that and provide it you at a later 3 time. 4 MR. FRUMIN: Well, I think it would be 5 useful for the reader of the report for you to 6 just have that in there, because you make 7 reference to NFPA-654 in 2006, or the earlier 8 version. And we might as well know at that time 9 had they applied the management system tools and 10 used the applicable standards, which standard 11 they would have used. 12 So, Mr. Hofmann, do you happen to know 13 what year it was just -- 14 MR. HOFMANN: Well, they started the 15 process in 2011 and in 2012 the final decisions 16 were made. 17 MR. FRUMIN: Okay. So, you know, 18 these were very recent, so we have an idea 19 informally anyway. Perhaps you could confirm it 20 and put that in the report what year that was. 21 I wanted to just confirm what the 22 sequence was for the alarm system. Was there a

(202) 234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. 155 1 point at which an alarm was activated which had 2 it been properly designed would have alerted not 3 only the other people in the plant and perhaps 4 triggered an evacuation, but also alerted the 5 East Rutherford Fire Department? Do you recall 6 what the sequence was, when that alarm actually 7 occurred in relationship to the different fires? 8 INVESTIGATOR BANKS: The alarm was 9 activated with the deployment of the suppression 10 system and the alarm could be heard in the 11 control room. It just wasn't heard plant-wide. 12 MR. FRUMIN: So roughly how long was 13 it after the -- 14 INVESTIGATOR BANKS: It was -- 15 MR. FRUMIN: -- suppression system 16 before the flash fire hit them? 17 INVESTIGATOR BANKS: The notification 18 would go to the East Rutherford Fire Department 19 almost at that same time and they responded in 20 due course. 21 DR. HOROWITZ: I think the question 22 was how long between the activation of the

(202) 234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. 156 1 suppression system and the subsequent flash fire 2 where the workers were? 3 INVESTIGATOR BANKS: Well, the signal 4 goes out immediately. 5 MR. FRUMIN: Right. 6 INVESTIGATOR BANKS: There were 7 minutes between the activation of that alarm and 8 the discovery of the flames from the hose over 9 the mixing tank. 10 MR. HOFMANN: Mr. Banks, I don't want 11 to be in a debate, but my clients have testified 12 under oath and my clients advised that there was 13 no alarm before the major flash fire. 14 DR. HOROWITZ: Yes, I think the 15 report is in concurrence with that. But go 16 ahead, Mr. Frumin. 17 MR. FRUMIN: Okay. So I just -- well, 18 this is a little confusing and it's because there 19 is precedent for this issue that I just wanted to 20 try to clarify it. So I understand that the 21 suppression -- that the activation of the 22 suppression system triggered an alarm which,

(202) 234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. 157 1 among other things, notified the fire department. 2 And the question -- so whether it was audible to 3 the workers or not, that -- and it was -- that 4 occurred minutes, as you said, before the fire 5 that then hit the workers, including in the 6 control room. Am I getting that right, or no? 7 INVESTIGATOR BANKS: All of the eye 8 witness testimony that we have is their recall. 9 So when we say minutes, it's -- time gets 10 distorted when -- 11 MR. FRUMIN: Okay. 12 INVESTIGATOR BANKS: -- folks are 13 under stress. 14 MR. FRUMIN: But there was some -- it 15 wasn't like instantaneous? I mean, the 16 suppression system occurred. That was activated. 17 You're not talking milliseconds here? 18 INVESTIGATOR BANKS: No. 19 MR. FRUMIN: All right. Okay. Those 20 are the only questions I had about it. 21 I want to thank you for the detailed 22 investigation. As always, we appreciate very

(202) 234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. 158 1 much the Board's focus on combustible dust and 2 the Board's leadership in calling attention to 3 the price that workers pay for the failure of 4 management to own up to its responsibilities to 5 design systems and to operate facilities 6 properly. 7 I think you've adequately identified 8 what's at stake by virtue of the delays in the 9 implementation of standards, whether it's 10 management's adoption of the recommendations of 11 voluntary organizations like NFPA or the failure 12 of the powers that be, whether it's the Labor 13 Department or the people who determine what the 14 Labor Department does in setting standards. So 15 we're still in a crisis here and you continue to 16 draw attention to that, so we appreciate that. 17 I do want to just mention for 18 historical context a similar event that's quite 19 important in the history of the Board. On April 20 21st it will be 20 years since another community 21 nearby suffered an incident that was as horrible 22 as this one was, orders of magnitude worse. This

(202) 234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. 159 1 was the incident at the NAPP Technologies plant 2 in Lodi, New Jersey that killed five people, 3 destroyed the town center, did a lot of damage to 4 the Saddle River, etcetera. 5 The Board didn't exist at that time. 6 The Board's existence was precarious at that 7 time. OSHA and EPA at that time were maintaining 8 that they could adequately investigate these 9 kinds of incidents. And to OSHA and EPA's 10 credit, after they issued their report on the 11 subject -- excuse me. And I would like to give 12 credit to the efforts that the OSHA and EPA 13 enforcement staff made to come to grips with that 14 problem. When OSHA issued its citations, they 15 acknowledged that they had no standard for 16 reactive chemicals and they couldn't cite this 17 company under the existing PSM standard. And 18 that was a terrible loss. 19 One of the problems, one of the -- 20 well, the evaluation of the significance of that 21 incident had a lot to do with the Board's 22 existence, because it was after the review of the

(202) 234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. 160 1 OSHA/EPA report that the White House and the 2 Congress agreed that it was necessary to create 3 the Board. 4 One of the people who reviewed the 5 report that OSHA and EPA issued was Jerry 6 Scannell, a New Jersey resident, former corporate 7 safety director for Johnson & Johnson, 8 subsequently head of the National Safety Council. 9 And he pointed to some of the very -- this was in 10 1997, a couple years later. He pointed to some 11 of the very same issues that you've identified 12 today. He said, for instance, that the 13 management systems need to be examined further. 14 In fact, in the ways that you've done it, but in 15 ways that you haven't. 16 He said, for instance, that the 17 qualifications, credentials and competence of the 18 managers involved in the decision making from new 19 product review to emergency response need to be 20 examined. And then he expressed his frustration 21 with the failure of the management to comply with 22 the existing standards, whether they were

(202) 234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. 161 1 mandatory standards or others. He said one of 2 the recommendations is essentially that companies 3 should comply with existing rules such as in that 4 case PSM and RMP. 5 What does this change, he said? Do 6 companies not know about the rules? Don't they 7 care? Aren't they worried about the consequences 8 of non-compliance, or don't they think they will 9 get caught? Essentially is why did this company 10 ignore the law and what should be done to reduce 11 the likelihood of companies ignoring the law in 12 the future? 13 So we're in the same boat today that 14 we were 20 years ago where managements of 15 sophisticated chemical companies continue to 16 ignore their responsibility, whether they're the 17 financial managers approving requests or that 18 they're the chemical engineers or other kinds of 19 engineers. And I just wanted to place this 20 particular incident -- because we're close to it 21 geographically but also on the anniversary of the 22 NAPP incident and the importance to the Board --

(202) 234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. 162 1 to place this incident in context and to commend 2 the Board for drawing attention to the 3 management's safety issues, both in this incident 4 and in others that you've done because of how 5 important those are in protecting workers. Thank 6 you. 7 DR. HOROWITZ: Thank you, Mr. Frumin. 8 The next is Paul Piantino. And please 9 do spell at least your last name. 10 MR. PIANTINO: Sure. Good evening. 11 Piantino, P-I-A-N-T-I-N-O. 12 Mr. Chairman, Board, I'm a partner at 13 the law firm of White and Williams. I have the 14 privilege and honor of representing one of the 15 injured workers in connection with this incident. 16 For the sake of brevity I just want to note for 17 the record that I join in the comments of Mr. 18 Hofmann that he's already noted and placed on the 19 record here this evening. 20 I did have a couple of discrete 21 questions separate and apart from the issues that 22 have been raised by Mr. Hofmann. I note that

(202) 234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. 163 1 earlier in the evening there was a slide by Ms. 2 Shroff. I think she's left the dais, but I know 3 Mr. Banks is aware of all of the details of this 4 investigation as the chief investigator. The 5 slide that Ms. Shroff put up indicated a 6 quote/unquote "heavy reliance" by outside 7 contractors. Mr. Hofmann alluded to this 8 briefly, I think, in his comments. 9 Did the CSB consider its charge to 10 include an analysis of the contracts and the 11 letters of engagement between US Ink and the 12 various vendors, dust collection experts and fire 13 suppression experts that it engaged? It seems 14 readily apparent that US Ink was in the black ink 15 business for purposes of manufacturing black ink 16 for newspaper printing. And like many of us, 17 when you get into an area requiring specific 18 expertise, you ask the experts. 19 So I noted a lack of reference to the 20 vendors and the experts in dust collection and 21 fire suppression in the report. It may have been 22 purposeful. So all I'm trying to ascertain is

(202) 234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. 164 1 did the CSB believe it was within the scope of 2 its charge to evaluate what US Ink had contracted 3 with others to handle by way of receiving 4 recommendations, advice, counsel, and of course 5 ultimately purchase and installation services? 6 So in the absence of Ms. Shroff, you 7 know, Mr. Banks, I -- 8 DR. HOROWITZ: Yes, I think the report 9 makes the point that US Ink did not provide 10 adequate oversight of contractors involved in the 11 installation of the system. I guess the caution 12 I would make is the CSB report and its 13 recommendations are in no way seeking to 14 apportion responsibility for the accident among 15 US Ink and any other parties who were involved 16 from a prevention standpoint. We direct the 17 recommendations, the proposed recommendations to 18 US Ink simply because they are the party that 19 owns the system, in the future is responsible for 20 its safety. So we certainly understand the kinds 21 of comments you and the other attorney for 22 victims are raising and I would just say we are

(202) 234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. 165 1 not apportioning responsibility from the parties 2 by who we describe them in the report. 3 MR. PIANTINO: Okay. So it's a fair 4 reading then that where we might see certain 5 references to US Ink that that could 6 interchangeably be interpreted as being not only 7 US Ink W-2 employees or full-time employees, but 8 agents or contractors that they have retained? 9 That's a fair inference? 10 DR. HOROWITZ: It's strictly a safety 11 analysis, so we looked at who in the future would 12 be in a position to prevent the accident. 13 MR. PIANTINO: And, Mr. Banks, I 14 gather you agree with that? 15 PARTICIPANT: We're going to have to 16 hold off on that type of -- the staff doesn't 17 answer questions per se and they make their 18 presentations, they certainly receive public 19 comment, but they are not here to answer their 20 assessment or evaluations of the report 21 themselves. They may, to a limited extent, have 22 answered some very factual questions, but in

(202) 234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. 166 1 terms of their own assessment, the report stands 2 for itself. 3 MR. PIANTINO: Right. Yes, and I 4 think our moderator has answered the question, 5 but I'm trying to just ascertain what really the 6 scope of the investigation was. And I think he's 7 answered the question, so we can move on. 8 Again, one of the other interesting 9 elements of the report, again not having a full 10 opportunity to review it prior to this evening, 11 is an indication that the flash fire, the second 12 flash fire in or around tank 306 had caused the 13 injuries that these individuals had sustained. 14 And that, according to page 14, seems to have 15 been brought about by the increased pressure in 16 the duct work which led to a discharge of the 17 suppression system. 18 And my question to Mr. Banks or anyone 19 who was part of the investigation is whether or 20 not there was any consideration given to the fact 21 that while the suppression system may have 22 prevented further damage to equipment,

(202) 234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. 167 1 particularly equipment on the roof, if it may 2 have actually hastened or caused the flash fire 3 which ultimately was the decisive force that 4 injured these gentlemen? And was there any 5 investigation into the suppression system in this 6 case doing more harm to human life than good? 7 INVESTIGATOR BANKS: Well, I think the 8 absence of a fire suppression system in the duct 9 work is captured in our examination of this 10 event. They explosion suppression system inside 11 the dust collector was designed to suppress an 12 explosion or deflagration. And when there was a 13 pressure registered, the explosion suppression 14 system performed. We examined inside the dust 15 collector post-incident. We removed the filters 16 and we could observe where the suppression 17 activated the nozzle, the indentation that it 18 left on the filters themselves. It was pretty 19 clear that that performed as designed. The 20 absence of a suppressant for fire in the duct 21 work is something that, as I said, we captured in 22 the report itself.

(202) 234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. 168 1 MR. PIANTINO: Did the CSB draw any 2 conclusions as to whether or not the discharge of 3 the suppressing agent and increasing the pressure 4 in the duct work itself though may have hastened 5 the flash fire itself? 6 INVESTIGATOR BANKS: I would say -- 7 CHAIRPERSON MOURE-ERASO: I'm sorry, 8 I have to interrupt this train of questions. The 9 report speaks for itself. You can read the 10 conclusions, the findings and the 11 recommendations. I mean, if you are trying to 12 elicit some new facts here, what I suggest is 13 that you read the report. And we stand by it. 14 MR. PIANTINO: Okay. 15 CHAIRPERSON MOURE-ERASO: And that is 16 what the object of the report is that, to present 17 our recommendations. I don't think that we can 18 second-guess it right now in this meeting through 19 public comment. 20 MR. PIANTINO: Yes, thank you, 21 Chairman. I'm not second-guessing the report in 22 asking these questions, but some of them are more

(202) 234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. 169 1 of clarification. But I thank the Board for its 2 time. Thank you. 3 DR. HOROWITZ: Thank you. 4 CHAIRPERSON MOURE-ERASO: Thank you. 5 DR. HOROWITZ: Is there anyone in the 6 audience who didn't sign up who would like to 7 speak? John Morawetz? 8 MR. MORAWETZ: Mr. Chairman, the Board 9 and the staff, what I mentioned earlier was 10 exactly the kind of -- 11 DR. HOROWITZ: John, could you say 12 your -- 13 MR. MORAWETZ: Again? 14 DR. HOROWITZ: -- spell your name once 15 again? 16 MR. MORAWETZ: M-O-R-A-W-E-T-Z. 17 DR. HOROWITZ: Thank you. 18 MR. MORAWETZ: This is exactly the 19 kind of report that I think is -- what I 20 mentioned earlier, that we use in training 21 programs, we talk to our local unions about. 22 It's a root cause analysis. Very thorough

(202) 234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. 170 1 recommendations, which are really good. 2 I'm here more on this report for the 3 Chemical Workers Union because we do represent 4 about three or four facilities that manufacture 5 carbon black. So it is of interest, the ins and 6 outs of this. A very thorough investigation, 7 that it wasn't, as far as I can tell, a simple 8 carbon black situation. Still lessons to be 9 learned. 10 I have four minor questions, or I can 11 make them as points. One is actually on the 12 slide up there. Is there a particular reason why 13 this recommendation to the company, the only one, 14 is oriented only to new personnel, not new and 15 existing personnel, and why there's an "or" for 16 initial and refresher? It's one thing we've seen 17 continually is it has a communication. It's a 18 one-shot deal training. If conditions don't 19 change, workers do not get any refresher training 20 unless another standard is triggered. So I don't 21 know if there's a particular reason. It's a 22 really minor point, but I would hope you would

(202) 234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. 171 1 consider it in the future. 2 DR. HOROWITZ: I think it can be read 3 as "initial and refresher training." Perhaps it 4 was a poor choice of word. 5 MR. MORAWETZ: No. 2, as the gentleman 6 spoke from the trade organization on construction 7 and building construction, I think that's a 8 really -- it shows the far-reaching effects of 9 your recommendations. Whether it's required or 10 not, people pick up on them, they read about 11 them, they try to make the right improvements. 12 And it's something I think of benefit. 13 Is there a trade organization that 14 covers the SIC codes that you identified for ink 15 product manufacturing? 16 DR. HOROWITZ: There is an association 17 of print ink manufacturers. I believe there is a 18 gentleman here at the meeting. 19 MR. MORAWETZ: So what I'm thinking 20 about; and again not necessarily to amend this 21 report, but as something to go in the future, 22 it's been a strength of other reports that it has

(202) 234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. 172 1 these far-reaching recommendations to other 2 applicable organizations, that they should to 3 hazardous analysis, management of change and do 4 that analysis. 5 Three, you mention in Section 6.3 the 6 hazard communication and evacuation plan, but 7 there's no particular mention of the OSHA 8 standards that govern that. Not that that's your 9 responsibility; that clearly is OSHA's, but it 10 would seem to me this is an opportunity to 11 mention and reference applicable OSHA standards. 12 Is there a particular policy on CSB about 13 mentioning or not mentioning other standards? 14 DR. HOROWITZ: Not to my knowledge. 15 MR. MORAWETZ: Okay. A suggestion in 16 the future. 17 Last but not least, I stand here also 18 as a member, a board of director of the American 19 Conference of Governmental Industrial Hygienists, 20 and it's good to see the use, as we know industry 21 uses the Industrial Ventilation Manual. There 22 also is -- it's one of the major courses that we

(202) 234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. 173 1 do regularly, is put on industrial ventilation 2 classes. So I don't know where that would go in 3 terms of interaction between the CSB and ACGIH, 4 but I think that is an opportunity for 5 collaboration and joint work that we should both 6 look into. 7 DR. HOROWITZ: Well, we appreciate 8 that and any context you could help us in terms 9 of the distribution of this work or further 10 education efforts we'd be very, very interested. 11 MR. MORAWETZ: We'll be in contact. 12 DR. HOROWITZ: Thank you. Any others? 13 (No audible response) 14 CHAIRPERSON MOURE-ERASO: Thank 15 everybody for its comments. And we now proceed 16 to the vote. I am prepared to hear motions on 17 this report and this case study. 18 MEMBER GRIFFON: Mr. Chairman, I'll 19 make a motion. I move that the Chemical Safety 20 Board approve Report No. 2013-01-I-NJ, titled, 21 "Ink Dust Explosion and Flash Fires in East 22 Rutherford, New Jersey at the US Ink/Sun Chemical

(202) 234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. 174 1 Corporation That Occurred on October 9th, 2012," 2 including all findings and recommendations 3 contained or referenced in the case study. 4 CHAIRPERSON MOURE-ERASO: Is there a 5 second? 6 MEMBER EHRLICH: I'll second that 7 motion, Mr. Chairman. 8 CHAIRPERSON MOURE-ERASO: So I will 9 ask is there any discussion among the Board, 10 further discussion on the case report? 11 (No audible response) 12 CHAIRPERSON MOURE-ERASO: Hearing 13 none, I will call the question, and I ask the 14 general counsel to proceed. 15 DR. HOROWITZ: The question on the 16 motion is the approval of the report just 17 referenced by Member Griffon, so I will call the 18 roll accordingly. Mr. Ehrlich? 19 MEMBER EHRLICH: I vote in favor. 20 DR. HOROWITZ: Mr. Griffon? 21 MEMBER GRIFFON: I vote in favor. 22 DR. HOROWITZ: Mr. Chairperson?

(202) 234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. 175 1 CHAIRPERSON MOURE-ERASO: I vote yes. 2 DR. HOROWITZ: In that case, the 3 report has been duly adopted. 4 CHAIRPERSON MOURE-ERASO: Our business 5 is almost done. I only have a closing statement. 6 I would like to reiterate that the 7 message of this report is that we are summarizing 8 our findings in the recommendations, and that we 9 propose a total of eight safety recommendations 10 that are very specific that include 11 recommendations the U.S. Occupational Safety and 12 Health Administration, the State of New Jersey 13 and the US Ink Company. Let me emphasize part of 14 those recommendations. 15 First, we are reiterating a call to 16 OSHA to issue a comprehensive combustible dust 17 standard to follow the guidelines that are 18 already state-of-the-art in the control of 19 combustible dust on the National Fire Prevention 20 Association to include those. 21 We also ask OSHA to add the printing and the 22 ink manufacturing facilities to the list of

(202) 234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. 176 1 industries that are pat of the Combustible Dust 2 National Emphasis Program. 3 To the State of New Jersey we also 4 made recommendations to the New Jersey Uniform 5 Construction Code, to the New Jersey Department 6 of Community Affairs to address issues that you 7 saw the details in the presentations. 8 And finally, we made recommendations 9 to the US Ink specifically to install automatic 10 fire alarm systems consistent with the National 11 Fire Prevention Association Guidelines and also 12 to address the issue of training workers on these 13 facilities and the training that should include 14 not only the original training course, but 15 refreshers that we specifically make in our 16 recommendations. 17 So those are the messages of this 18 report and that we would like everybody to carry 19 on. 20 I would like also to thank Mr. Griffon 21 and Mr. Ehrlich for their participation in 22 today's meeting. All of us share a strong

(202) 234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. 177 1 interest in preventing these tragic explosions 2 from occurring. Our hope is to make sure that 3 workers, that the communities and the emergency 4 response personnel are not forced to experience 5 an incident similar to the two discussed here 6 today. In the next few months the CSB will be 7 working with recommendation recipients to create 8 safer working environments and communities. 9 I would like also again to thank all 10 the participants, especially the people that 11 participated in the public meeting with their 12 comments. And with that, I declare this meeting 13 adjourned. 14 (Whereupon, the above-entitled matter 15 went off the record.) 16 17 18 19 20 21 22

(202) 234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. (202) 234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. 178 A $500,000 44:5 A-3881 58:1 a.m 25:16 A106 40:7 ability 21:14 60:5 able 4:4 39:10 60:18 100:11 112:20 126:15 128:20 130:1 133:2 144:16 abnormal 34:7 above-entitled 177:14 abruptly 31:21 absence 112:11 164:6 167:8,20 absolutely 13:18 130:2 absorbs 20:5 accelerate 24:8 accelerated 25:13 31:19 115:21 acceptance 3:22 94:17 accepting 93:14,14 access 70:12,14,19 71:11 73:7 accessed 70:13 accident 57:4 106:16 110:17 111:9,15,19 111:20 139:19 164:14 165:12 accidents 5:8,10,15 54:14 108:19 109:2 111:21 143:8,10,19 accompanied 82:13 account 148:10 accounts 44:8 71:15 85:17 accumulated 21:17 71:18 82:21 83:14 88:19 89:14 91:2 92:8 92:11,13 116:12 117:8 accumulating 21:13 accumulation 88:7,10 89:1 90:6 93:1,5 95:18 117:1 150:10 accumulations 86:16 86:18 ACGIH 90:15 91:19 92:3 173:3 acknowledge 10:1 11:10 101:13 acknowledged 159:15 Act 55:12,14 58:2,22 acted 82:22 action 16:10 108:10,16 129:17 138:20 actions 100:1 126:19 activate 35:4 106:1 activated 42:22 71:5 79:5,7 84:19 85:16 155:1,9 157:16 167:17 activation 82:9 85:17 155:22 156:7,21 active 43:14 activities 52:18 77:6 102:19 activity 89:15,16,20,21 126:19 actual 102:21 107:20 145:13 149:19 actuate 74:19 75:10 actuated 75:17 acute 44:4 add 42:19 121:20 122:10 175:21 added 138:18 adding 22:16 addition 15:5 28:21 29:4 56:14 72:7 79:8 101:10 104:17 105:21 additional 35:10 56:16 82:20 89:21 92:11 98:15 101:15 Additionally 9:10 84:2 address 6:1 7:3 36:5 46:11 104:8 105:17 119:17 132:5,14 137:9 138:22 139:11 176:6,12 addresses 7:9,17 addressing 111:19 adequate 15:10 36:6 51:16 52:8 93:8 99:15 102:12 103:17 117:11 117:18 126:12 136:13 144:17 164:10 adequately 52:9 104:7 158:7 159:8 adhered 129:20 adjacent 69:18 70:9 adjourned 177:13 adjustments 95:3 administration 107:6 120:4 137:18 175:12 adopt 63:10 136:3 150:3 adopted 63:19 115:8,10 136:7 137:19 175:3 adopting 137:16 adoption 113:16 123:19 158:10 adoptions 55:17 adopts 119:5 advance 90:17 advice 164:4 advised 57:15 156:12 advocate 16:13 advocates 112:2 aerosol 20:15 Affairs 113:5 119:13 120:7 123:4,16 124:5 176:6 affect 115:3 141:13 affiliated 14:3 affordability 135:22 affordable 137:15 affords 36:4 afternoon 51:18 144:15 agencies 45:1 50:9 124:11 agency 5:3,7 10:22 12:20 28:4 29:5 58:17 107:9 108:7,14 110:12 112:13 113:7 118:11,11 121:4 124:7 132:14 151:18 agency's 121:1 142:19 agenda 3:7,12 11:15 18:4 65:14 66:13 108:16 126:5 agent 69:8 168:3 agents 165:8 ago 49:5 52:14 161:14 agree 147:5 165:14 agreed 160:2 ahead 39:1 79:10 156:16 aid 96:16 aim 33:1 aimed 64:2 140:1 air 20:15,20 21:7,10 55:14 73:19 74:4,9 79:15 84:8,12 89:5,7 89:8,22 91:12,12 94:3 94:20 98:2 112:17 145:21 147:11 airstream 73:22 AL 15:22 109:8 121:15 121:17 132:7 Alabama 7:11 12:13 17:11 19:1,15 41:16 62:6 64:14 alarm 25:21 71:4 79:2 81:8 103:5,7,10,15,17 103:19 124:18 127:1 127:5 128:1 154:22 155:1,6,8,10 156:7,13 156:22 176:10 alarms 25:2,4 37:2,4,11 124:17 alert 64:2 78:5 alerted 79:5 155:2,4 alerting 25:21 Allied 140:21 allow 123:11 125:14 151:16 allowed 70:19 73:7 100:7 101:22 allowing 149:7 allows 151:21 alluded 163:7 alongside 71:22 alterations 95:3 altered 141:18 alternate 145:12,18 146:11 amend 171:20 amended 115:9 amendments 57:17 136:7 American 90:7,14 91:18 110:20 121:21 172:18 ammonia 3:16 7:8,18 7:19 8:8 11:17 14:18 14:22 15:15 17:9,16 17:21,21 19:19,21,22 20:1,4,9,12,19 21:3,5 21:19 22:6,8,10,12 23:6 24:3,5,13,15 25:15,19 26:3,5,7,9 26:10,14 27:5,9,14 28:13,17,22 29:2,16 29:19 30:7,21 31:11 32:4,6,18,22 33:15 35:2,3,9,10 37:3,10 37:13,19 38:1,10,19 39:1,4,6 42:1 43:16 43:20,20 44:1,13 46:1 46:9,9,11,16 47:1,2,4 47:11,11,16,17 51:6 51:11 52:16 54:3 56:5 58:3,5,12,14,18 62:3 62:18,21 64:5 ammonia-containing 33:2 42:6 amount 34:20 93:3 amounts 88:17 89:3,9 89:14 analysis 50:8 53:7,17 57:9 64:11 67:21 86:20 88:1,6 99:7,12 100:13,15 106:6 117:15 125:4 163:10 165:11 169:22 172:3 172:4 analyze 148:2 analyzed 146:20 analyzing 148:17 anhydrous 3:16 7:8 8:8 11:17 17:9 19:21 20:9

(202) 234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. 179 26:7 47:10,11 56:5 58:3,5,12,18 62:3 64:5 Annex 94:12,17 anniversary 161:21 announce 103:3 announced 60:11 108:4 answer 40:2 41:12 43:22 140:6 165:17 165:19 answered 165:22 166:4 166:7 answering 152:17 Antonio 152:7 anybody 3:20 47:22 61:13 anymore 45:11 anyway 154:19 apart 162:21 apologies 133:17 apparent 163:14 appeared 26:3 78:13 86:18 114:15 Appendix 122:1,2,14 applicable 45:21 52:11 53:18 125:8 139:2 153:18,20 154:10 172:2,11 application 122:6 applied 53:19 106:10 116:5 154:9 applies 115:12 apply 115:16 119:10 apportion 164:14 apportioning 165:1 appreciate 12:18 65:16 157:22 158:16 173:7 approach 6:2 45:8 64:1 127:9 approached 79:1 appropriate 12:1 114:22 122:6 appropriately 115:7 appropriations 100:6 125:1 approval 100:8 174:16 approve 61:22 100:10 173:20 approved 153:17 approving 161:17 approximate 31:3 approximately 82:17 85:14,18 92:2,9,12 April 108:4,9 158:19 ardent 10:18 area 11:22 27:22 55:22 63:1 70:18,21 79:2,6 82:7 122:5,9 145:3 163:17 areas 20:4 21:6 75:7 124:19 arena 35:20 arm 80:17 arms 80:12 array 45:21 arrived 31:20 81:6,9 ascertain 163:22 166:5 Ashley 2:18 140:12,19 asked 10:3 53:9 asking 3:17 15:9 133:12 168:22 aspects 5:9 96:6 assembled 83:1 assessing 127:19 assessment 93:16 165:20 166:1 asset 100:6 assigned 55:20 assist 39:10 147:17 assistance 113:8 associated 22:5 29:20 30:4 100:16 104:20 114:7 118:4 143:2 association 69:10 90:16 91:4 94:1,13 98:1 123:18 135:3 171:16 175:20 176:11 assume 131:3 assumed 102:7 assured 49:12 ASTM 40:7 atmosphere 20:14 72:2 atmospheres 69:22 ATSDR 28:5,7 attached 73:13 89:6 97:1 attack 57:22 attempt 41:19 42:1 103:6 127:8,10 129:21 attempted 28:19 103:10 105:12 146:4 attempting 35:6 105:19 attention 3:7 82:6 98:12 143:19 158:2,16 162:2 attorney 164:21 attorney/advisory 18:16 attorney/investigator 1:18,18 33:8 67:9 attracted 82:6 attributed 136:16 audible 6:4 7:4 9:13 23:18 37:2,5 61:15 63:4 71:4 79:11 103:15 157:2 173:13 174:11 audience 6:1 7:3 11:20 12:15 32:18 43:5,7 46:5 169:6 audio 1:22 August 17:11 24:14 41:16 62:6 Austin 152:7 authority 34:17 113:6 123:11 authorized 34:16 55:8 automatic 71:1,3,5 97:4 97:10 98:5 103:14,17 103:19 124:17 176:9 automatically 25:8 34:9 76:18,19 available 33:6 46:22 95:13 average 91:21 averaging 55:18 avoid 33:16 34:13 75:5 avoided 8:1 23:11 aware 25:15 148:8 163:3 awareness 132:18 142:6 B b 40:7 122:17 back 6:20 11:4 20:6,7 24:19 39:4 41:7 51:19 52:2 74:7,9,12 85:21 86:8 96:14 146:15 153:8 background 67:19 backing 55:15 bad 126:19 132:12 Badisha 67:11 bag 66:11 69:3 70:9 71:8,17,21,22 73:5,14 77:17 78:2,8,20 82:4 82:5 86:10 95:15 96:14 98:20 145:15 bags 71:22 Banks 1:17 2:5,13,15 12:8,11 16:19 17:1,2 18:14 36:3,22 45:9 65:15,17,18,19 67:8 81:2 119:18,20 126:4 126:15 127:5,17 128:13,19 129:5,11 130:20 131:5,9,11,14 131:19 133:5,9,14,20 134:3,6 151:12 153:22 155:8,14,17 156:3,6,10 157:7,12 157:18 163:3 164:7 165:13 166:18 167:7 168:6 bar 87:5,11 base 107:11 based 12:7 14:21 62:5 75:4 90:4 125:8 138:15 basically 39:4 basis 58:12 batch 77:14 Bay 19:15 becoming 143:6 beef 19:10 Beeta 1:18 2:6 18:16 33:8 62:16 began 112:14 begun 108:5 behalf 6:10 48:20 140:20 144:7 145:4 149:13,15 behest 151:17 believe 5:20 9:11 14:22 15:5 41:8 53:10 64:17 120:10 148:8 164:1 171:17 believes 7:19 88:7 111:18 137:13 benefit 171:12 Bergen 48:22 151:6 best 13:22 93:20 96:15 97:3 better 54:4 beyond 39:21 114:20 bicarbonate 74:17,19 75:10 bill 48:16 58:3 bills 58:1 bit 131:5 145:1 153:12 black 68:8,9,11,15,18 68:22 69:5,7,8 72:15 76:3,11 77:14 79:9 80:8 82:21 83:15 84:16 86:18 98:18 111:6 129:14 163:14 163:15 170:5,8 blast 19:11 24:22 25:5 25:20 29:11 30:1,5 32:2 bleed 34:9 89:5,7 bleeding 25:9 blend 84:16 blew 84:12 blockage 117:20 blocks 47:12 blower 145:21 board 1:1,10,12,13,14 1:22 2:7,11,16,21 3:5 3:17,21 4:12,17,18

(202) 234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. 180 8:18,22 9:11,15,19,21 10:21 12:21 13:1,20 14:7 16:5,12 17:3,3 18:8,9 35:12,14 43:8 43:9 48:1,5,14,21 49:12 50:3,12 51:11 52:9 54:12 59:15 60:5 60:6,10,15,17,19,20 61:17,20,22 62:19 63:3 66:17,18 112:7 120:14,18,21 126:5 134:21 139:18 140:5 140:17 142:10 143:11 143:18 144:6,12,19 147:22 149:6,11,22 152:16 158:19 159:5 160:3 161:22 162:2 162:12 169:1,8 172:18 173:20 174:9 Board's 16:11 59:20 158:1,2 159:6,21 boat 161:13 Booker 5:21 6:6,10,14 bottom 22:7 30:10 brand 147:1 break 4:3 63:22 64:21 breath 28:8 brevity 162:16 brief 68:9 104:12 briefly 6:8 21:1 28:19 65:3 163:8 bring 67:11 128:20 brittle 30:13 broader 62:21 brought 151:17,22 152:9 166:15 Bruce 2:17 134:17,22 150:2 building 37:3,6 47:12 78:7 82:14 101:11,17 103:9 105:14 113:9 113:17 115:9,10,13 115:14,15,19 116:4 119:6,14 123:20 127:6 135:4,6,18,20 136:5,9 137:12 171:7 buildings 113:15 115:18,20 135:8,9 136:21 137:1,11,20 137:21 138:1,7,10 builds 21:10 built 31:14 135:13 136:16 137:14 139:21 bulk 68:19 bulletin 2:5 3:15,22 7:8 7:15,22 14:21 15:18 16:22 32:10 45:3 46:3 47:7 50:16 52:21 53:21 61:18,22 64:12 64:17 bulletins 32:14 Bureau 105:6,9 burn 8:16 66:6 80:6 burned 84:14 86:17 106:15 132:11 144:9 146:10,13,16 burning 87:17 115:21 116:16 145:20 burns 80:8,9,11,17 business 9:9 11:1 110:21 163:15 175:4 button 42:21 C C 1:16 C-O-N-T-E-N-T-S 2:1 CAAR 100:7,8,12 California 60:13 call 3:6 12:1 42:12 45:7 63:6 65:15 134:8 174:13,17 175:15 called 7:9 17:22 108:9 135:15 147:15 calling 120:15 158:2 calls 107:8 campaigning 54:18 Canada 18:21 141:3 canal 26:6 27:3,6 29:14 canisters 82:10,11 84:21 85:16 86:6 cap 31:20 capable 19:11 capital 100:6 125:1 captured 167:9,21 CAR 125:1 153:17 carbon 68:22 69:5,7 82:21 83:15 84:16 111:6 129:14 170:5,8 care 17:18 27:17 161:7 career 13:17 152:5 Cargill 52:14 Carlstadt 68:4 carry 10:13 176:18 cars 27:10 cartridge 73:18 74:5 cartridges 73:21 case 2:12 4:6,9 7:11 8:11 11:3,18,19 15:14 45:2,15,18 53:2 60:13 61:14 64:22 65:7 94:10 128:20 161:4 167:6 173:17 174:3 174:10 175:2 cases 16:2 Casper-Onanberg 67:14 cast 61:3 Castro 65:9 casts 60:6,8 catastrophe 122:18,22 catastrophic 55:11 56:13 57:4 58:2,22 106:20 142:7 143:10 143:19 caught 161:9 causal 88:9 cause 24:4 50:8 64:4 111:12 169:22 caused 17:12 25:12 29:16 80:6 83:1 84:14 84:21 86:7 116:16,22 120:12 166:12 167:2 causes 5:10 22:21 23:17 54:13 111:18 111:20 129:12 causing 23:22 caution 164:11 CDC 28:7 ceiling 79:21 cell 11:8 center 28:3 159:3 centigrade 69:14 central 71:6 certain 110:16 119:9 145:5 165:4 certainly 61:4 147:4 164:20 165:18 certified 123:12 CFEI 1:17 chained 71:13 Chair 18:11 66:21 Chairman 13:4,4 14:13 17:3 48:9 60:4 63:17 134:17,20 140:17 149:6 162:12 168:21 169:8 173:18 174:7 Chairperson 1:11 3:3 4:17 6:5,22 7:5 9:14 14:10 16:15 35:13 39:12 43:3 44:17 46:7 47:9 49:17 59:5 61:16 62:10,13 63:2,5,18,20 65:4 126:2,3 128:5 131:15 133:1,7,10 134:7,12 140:10 143:21 168:7,15 169:4 173:14 174:4,8 174:12,22 175:1,4 challenge 87:18 change 23:15 100:14 101:21 112:4 117:15 125:5,14 138:21 152:20 153:1,15,21 161:5 170:19 172:3 changed 141:12 changes 20:2 100:19 101:9 105:1 114:7 channel 19:14 Chapter 151:20 charge 12:12 163:9 164:2 charged 25:11 charging 72:5 chart 87:12 91:17 check 11:15 77:20 78:19 check-in 11:22 checking 81:17 93:12 checkup 93:8 chemical 1:1,10,12,12 1:13,22 3:5 5:8,9 9:8 10:21 13:11,21 14:8 20:10 46:21 47:13,14 47:15,20 48:5,21 51:2 51:11,12 54:11 56:8 56:13 59:20 60:5,6,15 61:22 68:3 74:20 75:11,18 86:20 92:17 93:9 96:1 97:1,15,20 99:2,14 100:9,10,16 101:10,19 110:7 112:9 117:10 118:8 121:2 124:15,22 125:12 134:21 139:18 140:4 141:18 142:10 161:15,18 170:3 173:19,22 Chemical's 144:10 chemicals 10:13 87:8 148:9,12 159:16 chest 28:10 Chevron 60:13 chief 163:4 choice 45:2 171:4 choose 63:22 136:3 circulating 21:19 circulation 35:9 circumferential 30:9 circumstances 45:17 citation 38:15 citations 111:16,19 159:14 cite 159:16 cities 136:2 claimed 106:21 clarification 133:22 169:1 clarify 61:2 156:20 classes 173:2 classification 110:20 110:22 118:21 121:21 122:12 123:21

(202) 234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. 181 classified 111:14 138:11 classify 129:8 clause 107:19 clay 68:22 72:10 82:21 83:16 84:16 clean 55:14 91:2,14 cleaning 89:19 cleanup 26:20 27:21 clear 8:2 36:12 150:1 153:17 167:19 clearing 25:4 clearly 53:13 126:22 172:9 clients 68:12 144:8 145:4 146:10,13,17 156:11,12 close 150:13 161:20 closed 150:12 closely 142:9 closing 2:22 4:14 18:11 29:2 63:21 66:21 121:18 175:5 clothing 80:7,10,19 cloud 20:16 26:2,5,10 26:14,15 27:4,8 79:9 Coalition 152:20 Coast 29:13 code 110:21 111:1,2,3 113:4,4,12,13,17 114:1,2,22 115:6,9,10 115:11,15,17,19 116:4 118:19,21 119:5,6,14 121:22 122:12,13 123:7,11 123:17,20 124:18 134:18 135:2,6,17,17 136:5,6,9,10,18,19 138:19,20,21 139:7 139:13 140:3 149:14 150:7,22 151:16 152:6,14 176:5 codes 91:4 113:17 135:7,11,14,22 136:3 136:4,7 137:17,19 140:8 150:3,4,17 171:14 coil 21:11,13,17,19 22:5 22:19,20,20,22 23:3 24:7 25:10,12,13 30:21 31:2,4,8 33:22 coils 21:5,9 22:13,13,17 23:19 34:9,21 cold 19:8,17 21:6 22:15 30:20 31:13 45:11,13 47:4 collaboration 72:18 173:5 collaboratively 142:18 colleague 88:2 99:8 106:5 colleagues 16:12 collect 72:4 collected 74:7 86:19 87:14 collecting 72:20 collection 66:9 72:12 72:19,21 73:4,11 74:6 76:6,17,21 77:4,7,9 78:13 83:10,20 84:5 84:11 85:2 88:1,13,15 89:12 90:4,22 91:16 91:22 92:10 93:9,15 93:18 95:11 96:3,4,6 96:10 97:6 98:17 99:13,17,22 100:5 101:1 102:5,9,14,18 104:8,11,14,21 106:13 111:17 112:15 112:19 113:22 114:4 114:8,10,13 116:2,14 116:19,20 117:6,13 117:19 118:6,10 125:8 147:11 163:12 163:20 collector 70:17 73:1,10 73:16,17,20 74:2,12 74:14,18,22 75:20 81:21 82:1 83:6 84:8 84:13,15,18 85:4,7,11 85:14 86:2 88:20 90:1 92:7,20 93:12 97:2,17 98:13 99:4 146:2,3,7 146:9 147:12 148:2 167:11,15 college 149:13 color 68:11 colorless 20:13 combined 92:12 combustibility 130:19 combustible 4:8 6:17 7:12 11:18 14:18 16:2 16:4,8,14 49:7,14 53:11 75:6 79:13 84:10 88:8 91:10 94:8 96:8 105:21 106:12 106:17,19 107:1,7,10 107:13,17,20 108:1,3 108:6,19,20 109:3,7 109:22 110:4,6,9,10 110:12,15,17,18 111:5,12 112:1,8,13 113:1 115:22 116:6 116:12 118:6,12,14 118:17,22 119:2,8,17 120:11,17 121:1,8 122:2,7,14,16,20 123:1 124:1 132:3 138:9,17,22 139:5,9 139:14,15 141:7 142:1,13,17,19 143:2 150:1 158:1 175:16 175:19 176:1 combustion 84:9 come 3:20 13:6 24:2 33:9 51:5 159:13 comfortable 9:2 coming 12:18 37:14 41:7 48:21 145:14 commend 144:18 162:1 comment 2:8,17 3:19 11:21 48:3,4 61:6,14 62:14 63:1 140:18 144:14 165:19 168:19 commenter 48:10 134:17 comments 4:11 11:16 12:2,4,5,18 18:9 48:6 51:20 66:18 133:13 140:5 144:11 149:1 162:17 163:8 164:21 173:15 177:12 commercial 51:3 68:12 135:8 137:1 commission 117:12 commissioned 72:22 76:7 commissioning 76:10 83:21 84:6 93:8 99:16 116:20 117:18 137:21 commit 108:12 commitment 12:10 14:5,8 committed 13:19 Committee 138:20 commodities 45:12 common 21:16 23:9,16 24:5 28:7 55:19 commonly 20:10 141:1 Communicate 122:5 communication 5:4 99:20 102:12 103:1 110:5 118:1 170:17 172:6 communications 36:12 communities 10:9 54:16 55:4 57:3 64:7 151:7,9 177:3,8 community 13:21 29:7 59:2 113:5 119:13 120:6 123:4,15 124:4 141:17 151:5 158:20 176:6 companies 107:12 113:18 143:5 161:2,6 161:11,15 company 7:9 15:13 18:19,21 19:16 38:18 50:18,20 67:18 68:2 100:20 112:16 113:22 128:10 130:5,10,17 159:17 161:9 170:13 175:13 compared 92:3 comparing 95:1 competence 160:17 complete 101:3 completed 23:2 77:15 94:15 102:4,10 108:6 completely 101:4,12 compliance 56:17 137:20 138:1 complicated 152:10 comply 118:16 160:21 161:3 complying 128:10,16 134:1 components 35:10 39:19 94:21 98:16 composite 3:9 composition 86:20 92:17 comprehensive 45:19 118:13 132:17 175:16 compressed 20:6 74:3 compressors 35:5 concentrate 52:3 concentration 20:20 96:7 130:11 concentrations 20:18 concept 102:17 concern 10:8 41:14 59:17,18 concerned 37:22 41:17 135:12 concerning 35:16 102:13 133:22 concerns 6:15 concert 36:15 conclude 145:16 concluded 82:9 83:12 concludes 83:8 125:21 conclusion 139:17 145:5,8,12 146:5 147:6,21 conclusions 146:22 168:2,10 concurrence 156:15 condensable 84:6 88:18 89:4,9 90:7,11 condensation 31:1 condense 25:13

(202) 234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. 182 condensed 20:6 31:12 31:15 84:9 conditions 15:11 30:13 72:15 137:5 170:18 conduct 45:2 61:20 67:17 conducted 28:5 40:2 86:22 93:21 101:15 104:2 117:16 132:3 conducting 26:20 44:19 conducts 119:13 Conference 90:8,14 91:18 172:19 configuration 21:22 configure 34:2 confirm 77:21 117:18 153:14 154:19,21 confirmed 28:12 43:7 confusing 156:18 congregated 66:7 78:10 Congress 5:17 58:13 160:2 Congressional 48:16 Congressman 5:20,22 48:11,15,20 49:12 connected 71:3 78:12 103:14 connection 162:15 connections 77:4 115:2 connectors 73:13 consciousness 28:20 consensus 142:22 consensus-base 135:17 consequence 44:1,2,6 57:9 consequences 15:15 39:5 79:18 161:7 conservation 135:5 consider 46:14 92:16 130:6 145:7 149:1 163:9 171:1 consideration 92:6 166:20 considerations 56:22 101:16 considered 10:22 47:19 58:6 69:21 75:2 97:15 100:14,22 129:4 130:7 140:2 considering 8:19 considers 135:18 consisted 73:12 80:11 consistent 17:16 28:22 79:12 124:17 137:1 176:10 consisting 116:11 consists 59:11 67:7 construct 135:7 constructed 137:22 construction 93:11 102:18 112:14 113:3 113:4,12,18,21 114:3 114:8 118:9 119:5 123:7 124:8,12 136:10,19 137:10,17 138:4 148:1 171:6,7 176:5 constructions 135:6 consultant 149:12 consultants 97:14 152:9 consulting 9:9 consumed 20:2 105:11 contact 24:2 31:13 39:9 69:12 173:11 contained 19:20 29:15 174:3 container 74:20,21 75:11,12,15 containing 23:20 29:20 31:8 69:5 70:3 71:20 contains 138:7 contaminated 29:10 content 72:10 contents 3:11 context 153:12 158:18 162:1 173:8 continually 170:17 continue 16:12 139:22 143:18 158:15 161:15 continued 42:7 58:20 76:22 77:14 84:6 89:8 132:14 145:21 continues 23:4 108:18 111:22 120:10 131:20 153:7 continuing 138:20 continuous 83:19 84:4 contract 27:12 contracted 164:2 contractor 102:7,10 147:15 contractors 26:20 27:2 27:9 71:16 93:10 102:16 125:7 147:10 147:20 163:7 164:10 165:8 contracts 163:10 Contrary 57:11 contrast 56:8 contributed 83:17 89:1 89:21 116:22 contributing 88:14 contribution 64:18 contributors 67:4 69:21 129:15 control 23:21 24:1,18 25:2,7 33:17,21 34:2 34:8 69:18 70:8,17,17 77:20 78:1,18 100:17 102:20 103:6 112:18 112:20 118:17 127:7 155:11 157:6 175:18 Control's 28:3 controlled 33:20 74:10 controlling 95:8 controls 84:1 117:3 convened 53:22 convey 74:2 90:1 conveyed 69:1 88:20 conveying 88:16 89:9 90:5 91:15,20 92:1 93:2 94:3 98:2 cool 21:7,15 22:7 cooling 21:18 34:12 coordinated 102:4 coordinator 103:3 127:15,18 copies 3:8 Corbett 2:19 149:3,4,4 core 67:7 Corona 1:18 2:13 67:9 80:22 81:1 88:5 corporate 160:6 corporate-level 100:8 Corporation 68:3 75:21 99:14 101:20 117:10 118:8 124:15,22 125:12 174:1 correct 133:5 134:8 corrected 9:17 correction 133:15 corrective 100:1 correctly 46:16 53:9 correlate 56:2 correlated 135:14 137:9 corresponding 55:20 corridor 70:15 79:10 80:2,5 corrosion 40:11,12 cost 75:4 97:20 135:21 coughing 28:8 Council 51:2 59:16 134:18 135:2 149:14 160:8 counsel 1:16 4:20 61:19 63:7 164:4 174:14 counter 86:7 counties 136:2 country 55:6,10 142:20 143:7 county 28:11 29:5 48:22 151:6,6 couple 15:9 39:14 43:4 43:12 59:17 60:16 126:9 128:6 149:16 153:10 160:10 162:20 course 46:12 150:19 155:20 164:4 176:14 courses 172:22 court 49:21 covered 46:19 53:13 80:8 116:3 123:9,10 covering 3:10 covers 81:22 171:14 CPA 55:18 CPL-02-007-137 123:1 CPL-03-00-008 122:3,8 123:2 crack 30:8 32:1 cracked 29:22 30:2,7 cracking 40:12 crafted 46:4 crane 28:17 create 46:3 160:2 177:7 created 85:3 86:6 creating 31:15 credentials 160:17 credit 159:10,12 crew 27:13 37:16,21 crisis 158:15 critical 57:1 cross-section 31:8 cross-sections 97:8 crucial 22:14 149:20 CSB 3:5 4:21 5:6 7:19 8:18 9:6,7 10:3,5,11 11:11 12:16 14:16 16:18 26:15 28:10 32:5,10,14 33:4 43:9 43:22 44:14,18 49:8 50:3,6 51:22 53:9 54:2,15,22 65:5 71:12 79:20 83:4,8,12 86:13 86:19,22 87:14 88:5 88:22 89:13 90:3,21 95:4,10,21 97:7,12 99:17 100:21 101:18 106:17,18,22 107:4,8 108:2,6,18,20 109:1 109:17 111:17,22 112:4 114:5,10 120:1 120:10 121:4,10,15 125:22 126:2 131:18 138:14 139:22 142:17 143:16 163:9 164:1 164:12 168:1 172:12

(202) 234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. 183 173:3 177:6 CSB's 8:22 33:10 58:20 106:6 112:9 121:13 142:14 CSB-screened 44:9 CSP 1:17 cubic 74:3 Cumberland 109:9 curious 41:4 128:8 current 57:16 86:8 128:11 currently 107:12 121:11 curtain 11:6 cycle 19:22 21:15 22:1 22:11 23:4,9,22 25:5 29:17 30:16,18 31:10 34:6,6 cycles 20:7 D D-1 122:1,14 D-2 122:2,14 D.C 12:7 dais 163:2 damage 8:3 141:16 159:3 166:22 damaging 17:22 23:8 24:9 dangerous 7:22 137:5 Daniel 48:5,7 data 44:14 85:3 87:7,10 94:22 95:1 126:12 135:19 date 57:20 108:12 day 24:11 26:19 30:17 41:15 42:4 68:6 69:22 76:12 80:16 86:3 92:10 98:10 99:4 104:3 141:22 153:9 days 92:14,21 93:6 de-energize 35:5 deal 170:18 dealing 150:1 153:13 deals 151:3 death 20:18 58:19 deaths 108:22 debate 156:11 debris 77:5 decade 49:9 decades 9:7 decide 52:1 decided 60:15 97:17 decision 15:7 41:2,3,5 41:6 42:18 46:2 75:3 127:2,8 160:18 decisions 15:12 154:15 decisive 167:3 declare 65:1 177:12 decline 85:20 decreased 42:9 decreases 21:8 dedicated 33:21 135:4 dedication 12:10 54:15 deep 26:21 27:6,20 70:8 defect 40:13 deficiencies 128:18 defined 47:20 definitely 41:14 definition 110:6 deflagration 20:19 37:22 79:13,14 87:17 88:11 115:20 122:20 146:6 167:12 deflagrations 139:15 defrost 21:15 22:1,11 23:4,9,19,22 24:21 25:4 29:17 30:16 31:10 33:20 34:2,5,8 34:10,14,18 degradation 95:10 degree 31:14 degrees 22:10,18 30:14 31:9 69:14 Delaware 59:14 delay 76:20 delaying 108:16 112:6 delays 158:8 delivered 139:6 demonstrate 94:16 112:2 denoted 70:6 densely 55:22 density 56:7 DEP 39:1,9 57:16 58:7 58:8,11 department 27:18 28:11 36:14,16 38:3 54:11 71:7 80:21 81:5 81:11 103:16 105:8 113:5 119:12 120:6 123:4,15 124:4 155:5 155:18 157:1 158:13 158:14 176:5 departments 36:7 151:8 depending 79:17 depiction 19:22 75:14 depicts 26:13 27:4 deployed 67:5 deployment 10:5,12 67:6 155:9 depression 70:16 depressurize 34:9 depressurized 23:1 depressurizes 24:7 deputy 67:15 describe 11:12 20:22 21:2 24:13 165:2 description 67:21 68:9 design 5:11 7:18 15:2 23:12 32:7 33:15,15 39:20,21 72:19 84:3 88:1,6,12,22 89:3,13 90:3,4,10,22 91:15 92:5,15,22 93:7 94:22 95:2,7,20 96:2 99:16 100:4 101:6 102:1,4,8 102:17 111:16 114:9 116:7,18 117:12,21 131:7 148:1,6,18 152:4 158:5 designate 120:18,22 designated 103:2 121:11 127:18 designed 5:14 23:5 45:4 74:1 76:17 86:1 87:15,20 91:22 96:5,6 97:3 100:10 102:20 104:15 107:9 114:20 137:8 155:2 167:11 167:19 designers 32:22 Despite 83:22 destroyed 29:10 159:3 detailed 157:21 details 100:3 163:3 176:7 detect 95:9 detected 74:16 79:4 81:18 85:15,19 deteriorated 72:7 determination 94:20 determine 87:1 93:18 95:2 104:22 124:12 158:13 develop 86:21 100:1 104:17 107:6 108:1,3 123:16 125:13 138:20 developed 32:9 54:22 136:4 139:3 developer 151:18 developing 101:7 development 16:13 112:6 120:15 135:17 135:18 140:3 develops 135:6 devices 95:14 diameter 30:4 70:22 97:10 difference 131:2 different 44:22 50:5 52:15 86:15 101:4,5,6 132:2 155:7 difficult 153:8 digest 145:1 diligence 54:18 diligently 14:1,7 direct 164:16 directed 75:16 direction 12:11 26:6 78:4 Directive 122:3,8,15 123:1,2 directly 70:15 75:15 82:17 85:4 director 13:13 48:4 59:10 67:15 152:22 160:7 172:18 disagree 147:6 disappointed 59:19 60:14 disappointing 52:19 discharge 74:10 84:20 86:5 126:14 166:16 168:2 disclose 151:5 disclosure 149:11 discouraging 105:18 discovery 156:8 discrete 162:20 discriminatory 56:21 discuss 21:22 43:16 62:20 67:18 100:3 106:5 119:19 120:8 discussed 12:6 106:11 177:5 discusses 99:12 106:9 discussing 14:16 discussion 62:7,12 63:3,6 174:9,10 Disease 28:3 58:17 Diseases 28:4 dislodge 74:5 dispersing 75:19 distillate 69:15,19 distinct 82:2 distorted 157:10 distribute 44:16 distribution 18:19 44:12 173:9 district 5:18 48:16 54:9 59:10,11,11 disturbed 11:9 division 68:2 dizziness 28:10 docked 19:4 27:14 28:18 docks 25:18 documentation 36:4 documented 28:13

(202) 234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. 184 51:7,13 doing 40:18 50:2 167:6 door 70:11,11,19 71:10 71:13 78:20 149:8 doorway 71:9 83:2 downstream 24:9 30:22 Dr 48:5,8 49:19 54:6 59:3,7 61:1,12,17 67:12,14 88:2 99:10 126:2 133:12 134:16 140:9,12 143:22 149:2 152:19 155:21 156:14 162:7 164:8 165:10 169:3,5,11,14 169:17 171:2,16 172:14 173:7,12 174:15,20,22 175:2 draft 11:12 drains 39:4 draw 46:5 84:6 143:19 145:21 158:16 168:1 drawing 82:14 162:2 drawings 125:6 drawn 73:21 146:1 drew 84:8 drills 104:1 dripping 78:14 drivers 46:2 drops 94:21 dry 72:5 duct 73:6 78:12,12 81:17 82:19,22 83:6,9 83:16 84:7,8 86:8,14 86:15 88:8,10,18 89:5 89:21 91:2,11,13 93:1 93:5 95:19 96:13,21 97:6 98:6,8 105:10 116:13 117:2,8,20 129:18,21 145:20 146:1,16 147:5 166:16 167:8,20 168:4 ducts 73:9,12 81:19 86:11 89:11,19 90:7 97:7,8 98:19 due 16:11 25:6 83:13 93:2 97:18,20 141:18 142:8 155:20 duly 175:3 dump 66:11 69:3 70:9 71:8 72:1 73:5,14 77:18 78:2,8,20 82:4 82:5 86:10 95:15 96:14 98:20 126:19 145:15 dumping 71:17,21 duration 42:9 dust 4:8 6:17 7:12 11:19 14:18 16:2,4,8 16:14 49:7,14 53:11 65:22 66:9 70:17 71:17,21 72:1,9,12,18 72:19,21 73:1,3,9,11 73:15,15,17,19,22 74:2,5,6,7,11,14,17 74:22 75:6,20 76:6,17 76:21 77:4,5,6,9 78:13 79:13 80:3,8 81:21 82:1 83:5,9,15 83:19 84:5,7,10,11,13 84:15,17,18 85:2,4,7 85:11,13 86:2 87:3,17 88:1,13,15,17,19,20 89:4,10,11,14,21 90:1 90:1,4,6,22 91:8,16 91:20,22 92:7,7,9,10 92:13,15,17,20 93:4,9 93:12,14,17 94:6 95:11 96:3,4,6,9 97:1 97:6,17 98:13,16 99:3 99:13,17,22 100:5 101:1 102:5,9,14,17 102:20 104:8,11,14 104:21 105:21 106:12 106:13,17,19,20 107:1,3,7,10,13,17,20 108:1,3,6,8,9,19,20 109:3,7,11,22 110:4,6 110:9,11,13,15,17,19 111:5,12,15,17 112:1 112:8,14,15,19 113:1 113:21 114:4,8,9,13 115:22 116:2,7,12,14 116:18,19 117:5,7,12 117:19 118:5,7,10,12 118:14,18,22 119:2,8 119:17 120:12,13,17 121:1,9,12 122:2,7,14 122:16,20 123:1 124:1 125:8 129:7 132:1,4,17 138:9,15 138:17 139:1,5,9,14 139:15 141:8,18 142:1,13,17,19 143:1 143:3 146:1,2,6,9 147:10,12 148:2 150:1,9 158:1 163:12 163:20 167:11,14 173:21 175:16,19 176:1 Dust-laden 73:19 dust/vapor 129:9 dusts 69:12 87:2 91:21 duty 107:19 E earlier 75:13 150:2 154:7 163:1 169:9,20 early 4:4,4 37:9 easier 71:14 easily 146:5 East 4:7 7:13 8:14 10:6 66:2 68:4,10 79:21 81:10 103:15 105:5,6 105:7 106:10 124:16 141:10 151:4 155:5 155:18 173:21 easy 148:4 echoing 6:15 economic 44:5 edition 91:11 94:5,8 98:4 education 32:21 139:7 139:12 173:10 effect 64:18 effective 71:20 92:6 101:20 103:18 107:20 137:13 effectively 107:17 effectiveness 93:17,18 97:21 effects 28:13 91:6 171:8 efficiency 93:13 effort 98:15 efforts 110:3 132:13 159:12 173:10 egress 136:13 Ehrlich 1:12 2:3 4:19 9:1,4,7 13:2,2,3 14:11 14:14 17:4 35:17,18 36:18 37:1,15 38:5,17 43:13 63:15,16 126:6 126:7,9,21 127:14 128:4 174:6,18,19 176:21 EHS 58:15 eight 29:9 88:22 120:4 175:9 either 45:5 79:16 110:16 148:7 electrical 113:17 114:7 115:1 electricity 24:16 electronically 51:17 100:11 elements 117:14 166:9 elevated 70:13 elicit 168:12 emanating 78:17 embers 145:22 emergency 11:4 13:14 15:3,12 26:14 27:19 29:5 35:4,20 36:1,8 36:19 41:4,22 42:13 42:13,21 53:16 80:14 80:21 99:20 103:2 104:2,4 118:2 126:22 127:11,15,17 137:6,7 160:19 177:3 emissions 72:11 112:20 emphasis 13:16 110:13 111:9 147:7 176:2 emphasize 128:8 175:13 employed 68:5 employee 17:15 28:16 29:1 38:10 77:8 78:3 79:1,5 80:6 82:3 96:19 98:22 99:21 104:19 105:12 employees 25:21 37:16 38:13 41:15 49:3 71:16 76:10 77:3 78:11 80:7,12,13,15 80:18 84:22 85:18 103:5,10,11,18,20 104:5,7 105:19 128:2 165:7,7 employers 110:7 143:9 emptied 77:16 empty 71:22 enable 100:17 enclosed 81:13 encountered 36:9 encourage 122:6 142:17 encouraged 152:13 encouragement 151:15 endorse 150:14 ends 26:11 endure 153:6 energy 82:20 135:5 140:21 enforce 113:9 150:20 enforced 136:8 enforcement 56:18 124:7,11 137:19 139:13 152:6 159:13 enforcer 150:8 engaged 76:19 163:13 engagement 163:11 engineer 42:18 47:14 72:17,20 102:2,3,6,15 engineered 147:4 engineering 47:13,15 47:20 87:22 88:6 100:5,22 102:6 114:9 115:4 118:16 119:7 125:6 147:16 engineers 90:21 96:2

(202) 234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. 185 97:13 100:21 101:19 102:9,15,20 161:18 161:19 engines 38:3 England 59:13 Engler 9:10 43:6 engulfed 27:7 enhancing 84:8 enormous 64:5 ensure 22:15 34:3,14 34:15,19 91:1 113:14 135:8 137:14 138:2 139:22 enter 11:1,5 entered 73:20 81:9 entering 118:5 entertain 18:7 66:16 entire 41:21 42:8 82:14 127:6 entities 147:18 148:1 148:16,20 entitled 7:15 62:1 65:2 entity 45:9 entrance 8:17 11:21 66:7 78:10 80:5 entry 71:14 environment 59:15 105:20 112:21 135:13 136:17 137:15 139:21 environmental 8:3 10:19 44:4 54:10 55:9 75:6 90:20 112:17 150:7 environments 177:8 EP 55:15 EPA 45:5 46:13 55:16 55:17 159:7,12 160:5 EPA's 159:9 equal 98:6 equipment 5:11 18:2 23:15 29:20 30:5 33:3 35:7,8,11 42:6 77:22 81:13 96:17 100:19 102:10 112:22 114:12 114:13,19 115:3,7,14 116:7 119:10 123:6,8 123:13 124:1,9 125:3 125:19 126:20 166:22 167:1 equipments 98:17 equipped 34:15 74:14 96:12 Eric 2:19 152:19,21 error 25:6 escape 28:19 escapes 43:19 64:5 escaping 38:2 especially 33:18 34:22 177:10 essential 139:20 essentially 87:4 161:2 161:9 establish 10:20 49:13 established 55:13 68:5 establishes 136:10,20 136:22 establishment 122:10 etcetera 147:5 159:4 evacuate 27:11 103:8 103:11 127:1,21 evacuated 27:22 128:3 evacuation 36:20 44:3 103:21 155:4 172:6 evaluate 100:16 123:13 124:11 164:2 evaluated 27:21 38:20 evaluation 159:20 evaluations 165:20 evaporates 22:7 evaporating 21:22 evaporator 21:5,11,13 21:17,20 22:5,6,13,19 23:6,19 25:8 29:22 30:4 31:4,8 32:1 33:22 34:12,21 evaporator's 21:14 evaporators 21:3 25:1 25:5 29:18,21 33:17 33:19,19 34:14 evening 3:3 6:10 13:4 17:5 22:3 24:15 48:13 48:14 54:8 59:9 65:19 134:20 140:6,17 162:10,19 163:1 166:10 evening's 17:19 18:5 event 17:22 23:8 24:10 29:17 30:7 31:7 34:6 35:3 57:6 64:4 78:22 81:15 96:7 129:10,12 130:3 144:10 158:18 167:10 events 8:1 49:5 64:3 82:2 85:1 106:14 116:16 131:22 132:9 eventually 21:14 everybody 3:7 173:15 176:18 evidence 83:7 exactly 132:21 152:2 169:10,18 examination 40:3 64:11 167:9 examine 5:9 87:22 examined 52:20 83:8 160:13,20 167:14 example 94:1 95:17 96:11 110:4 115:18 excellent 50:7 149:18 excess 33:19 69:13 excessive 88:7,17 89:3 89:9,14 93:1 excuse 159:11 exempt 101:7 114:1 150:22 exemption 114:16,18 123:5 150:11 exempts 114:11 119:9 exerted 31:21 exhaust 94:2 98:2 exhaustion 29:3 exist 45:11 53:12 159:5 existed 107:3 existence 159:6,22 existing 104:2 122:7 125:3 136:21 138:1 138:10 150:17 159:17 160:22 161:3 170:15 exit 11:4,5 13:9 exited 105:14 exits 11:3,6 expanding 61:5 expeditiously 108:8 experience 13:10 153:8 177:4 experienced 24:16 28:14 80:8 experiencing 24:18 27:8 expert 147:10 expertise 15:10 151:10 151:17,22 152:4 163:18 experts 148:20 163:12 163:13,18,20 expire 57:18 explanation 139:10 145:12,18 146:11 explicit 64:10 exploring 129:4 explosibility 87:5 130:21 131:2 explosible 20:20 87:1 explosion 7:12 8:12 10:6 16:4 20:19 49:1 66:1 69:12 74:15,18 75:2,9,14,22 76:15 79:6,17 83:12 84:17 84:19,20 85:6,13,15 85:19 87:9,18,19 96:22 97:2,16,19 98:14 99:1,3 104:18 109:4,7 111:15 113:1 122:20 137:4 138:15 141:9,15,19 143:17 146:2 148:11 150:9 167:10,12,13 173:21 explosions 91:9 94:6 107:3,10 120:13 131:17 142:7,13 143:1,4 177:1 explosive 69:22 export 19:2 exports 19:17 expose 141:7 exposed 57:3 70:16 80:9 141:22 exposure 17:16 27:9,15 28:5,14 29:1 exposures 28:3 express 153:4 expressed 160:20 expressly 58:8 extended 57:19,20 extensive 54:12 83:11 extent 130:2 165:21 external 21:10 71:6 75:5 extinguish 81:22 96:5 97:3 103:11 105:19 127:8,11 extinguished 81:12,19 105:14 extinguisher 103:6 105:13 127:10 extinguishing 97:5,11 98:5,8 extraordinarily 58:14 extremely 131:20 eye 28:9 157:7 eyes 20:17 eyewitness 126:18 F F 144:5 F-flow 88:16 90:5 F-I-T-C-H 140:16 F-R-U-M-I-N 152:22 Faber 147:15 148:5 faces 12:16 13:7 facilitate 142:18 facilities 7:19,20 8:8 18:20 32:20 51:7,9 52:15 56:11 64:10 116:6 119:8 122:11 122:15 138:12 142:4 143:13 158:5 170:4 175:22 176:13 facility 7:14 8:13 17:10 17:13 18:22 19:2,4,6 19:8,13,15 26:4,17 27:11 32:8 37:11,14

(202) 234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. 186 40:4 46:19 50:19 56:18 57:5 60:14 66:2 66:10 67:20 68:4 69:16 71:18 73:17 79:22 105:5,9 106:11 107:15 109:5,8,13 111:11 122:19 124:10 124:16 127:2 138:16 141:10 144:10 facility's 25:20 fact 37:2 148:8 160:14 166:20 factor 41:6 52:22 88:9 88:14 factors 46:2 52:13 55:6 83:17 factory 138:12 facts 168:12 factual 165:22 Fahrenheit 22:11,18 31:9 69:14 fail 96:21 fail-safe 39:2 failed 30:13 35:11 40:3 57:1 91:1 99:3 101:12 failing 105:13 failure 21:1 32:8 39:18 99:22 142:16 158:3 158:11 160:21 failures 31:4 32:15 fair 165:3,9 fairly 45:18 falling 28:20 familiar 12:16 143:6 families 49:4 141:14 153:6 family 135:14 fan 74:1 far 56:17 170:7 far-reaching 50:17 171:8 172:1 faster 87:16 fatalities 8:4 56:3 133:4 133:6 fatality 44:3 122:18,22 father 10:22 faulty 111:16 favor 174:19,21 feature 71:2 February 9:17,18 43:10 105:6 fed 22:6,20 federal 5:7 9:3 16:6,10 16:13 45:1 55:9,13 56:9,19,21 57:5,15 58:17 112:2,7 118:11 118:13 123:9 federation 153:2 feed 30:18 34:4 42:7 feeding 69:2 feel 9:2 46:4 127:22 feelings 153:4 feet 28:20 70:7,7,22,22 74:3 91:16,20 92:1,4 96:13,14,18 fellow 35:14 felt 45:17 field 147:10 fifth 92:22 fifty-two 27:16 44:13 fight 58:21 127:3 fighters 81:6,16,18,20 105:14 136:14 137:6 fighting 127:4 figure 22:4 Fike 147:13 148:5 filed 36:19,20 100:6 filled 84:15 fills 23:3 filter 74:4,5 filters 73:21 167:15,18 final 144:13 146:19 154:15 finally 18:10 66:20 95:1 176:8 financial 161:17 find 53:7,14 54:3,13 131:18 finding 8:18 129:7 findings 5:14 11:13 17:8 18:6 65:22 66:16 66:19 67:22 106:6 116:10 143:12,15 145:2 168:10 174:2 175:8 fine 14:4 fingertips 154:1 finish 64:19 finished 48:1 133:11 fire 10:6 27:18 36:7,14 36:15 38:3 66:11 69:9 71:2,7 75:7 78:1,5 79:7,16 80:3,20 81:3 81:3,5,5,10,16,18,20 83:5,9 84:13 86:10,12 91:3,6,8 94:1,6,13 95:22 96:2,8,21 97:4 97:10,22 103:3,4,4,4 103:6,7,10,11,16,17 103:19 104:1,4,18 105:3,7,7,8,9,11,12 105:13,14,15 113:1 115:4 116:16 117:22 118:16 119:6 123:17 124:17,18 126:16,17 127:3,3,8,10,11,11,20 127:22 135:4,7,19 136:6,14,15,18,20 137:4,6,17 138:2,6,19 138:19 141:19 143:17 145:9,14,19,22 148:11 149:14 150:17 151:8 155:5,16,18 156:1,13 157:1,4 163:12,21 166:11,12 167:2,8,20 168:5 175:19 176:10,11 fireball 79:8,11 80:1,10 fires 8:12 66:1 81:13,18 81:20 82:1 83:12 96:5 97:3 98:10,21 99:1 103:20 105:19 107:4 107:10 109:12 139:16 142:7,13 143:4 155:7 173:21 firm 147:16 162:13 first 3:6,13 6:8 7:8,22 9:6 11:16 12:22 14:20 21:1 25:9 35:22 39:17 41:13 48:10 54:11 59:18 62:9 64:19 65:6 81:6,8 82:3 92:10 96:20 106:16 109:3 112:9 120:8 121:1,3 121:13 123:3 124:14 134:17 142:22 144:2 144:14 145:14 149:21 153:3 175:15 Fitch 2:18 140:13,14,16 140:19 143:22 five 39:15 40:10 57:21 109:12 159:2 fixed 71:13 fixes 15:5 flame 79:14,19 82:17 82:18,19 83:1 86:7,8 146:9,12 flame-resistant 80:19 flames 69:13 81:11,14 105:11 127:20 129:16 156:8 flaming 146:15 flammability 69:10 flammable 69:20 105:20 106:13 116:11 117:1,7 118:5 flash 8:12 66:1,10 76:3 78:1,8,20 79:16 80:3 81:3,15 82:4 83:1,12 86:10,12 98:10,21 99:1 103:20 109:11 116:16 117:22 127:22 129:16 139:16 145:9 145:14,19 155:16 156:1,13 166:11,12 167:2 168:5 173:21 flat 71:19 flaw 92:5 flaws 117:21 flexible 73:13 96:12,15 96:20 flour 143:1 flow 116:22 flowing 23:16 focus 32:15,16 139:5 149:16 158:1 focused 13:15 35:19 47:6 98:12 foil 88:10 folks 132:20 157:12 follow 7:20 107:14 115:22 133:2 175:17 followed 28:10 104:3 109:22 following 4:12 10:2 12:17,19,20 28:6,12 28:15 29:7 41:11 61:21 85:3 94:19 101:8 122:7 125:4,17 133:15 follows 47:22 121:7 123:5 124:16 food 15:14 32:19 38:20 41:8 43:14,17 44:11 44:12 45:6,21 51:3 64:2,13 foods 44:16 foot 19:8 footnote 147:19 force 30:5 31:22,22 167:3 forced 177:4 fore 128:20 Forestry 140:21 forever 141:12 form 21:11 115:9 125:1 formally 10:3 formation 69:22 formed 26:16 former 160:6 forms 20:15 formulations 70:4 72:10 forth 51:19 52:2 forum 62:20 135:17 forward 9:19 43:10 133:13 142:16 forwarding 102:1 found 32:5 44:6 71:12 89:13 90:3,21 95:4,10 95:21 106:22 111:3 114:5,10 129:18

(202) 234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. 187 131:1 four 17:17 27:16 39:15 40:9 81:22 147:17 170:4,10 fourth 60:17,20 92:5 fracture 30:11 framework 106:10 frankly 52:19 FRC 80:19 free 91:2,14 freezer 20:4 21:8 24:22 25:5 29:12 30:1,5 32:2 freezers 19:10,11 21:6 25:20 freezing 19:12 frequency 14:18 40:21 Friday 76:8 front 3:8 6:3 70:15 86:7 146:9,12 frost 21:11,12,15,17 22:17,21,22 froze 19:3 frozen 19:9 25:18 38:20 Frumin 2:19 152:20,21 152:21 154:4,17 155:12,15 156:5,16 156:17 157:11,14,19 162:7 frustration 160:20 fuel 79:15 82:22 fugitive 71:21 72:9 74:11 full 44:20 51:14 53:7 149:10 166:9 full-time 165:7 fully 102:8,16 144:17 145:11 function 56:7 114:19 116:21 functionality 21:2 functions 47:16 101:6 fund 10:20 further 14:7 51:10,13 55:1 86:20 108:16 129:3 138:22 142:5,6 142:15 145:20 160:13 166:22 173:9 174:10 future 12:19 17:21 32:17 43:11 59:1,22 62:19 100:12 120:12 121:9 161:12 164:19 165:11 171:1,21 172:16 G gained 82:20 Gallatin 109:14 138:16 gap 149:21 150:13 gaps 128:17 143:20 gas 20:3,13 21:9,19 22:8,16,18,19,22 23:2 23:8,11,19,20 24:2,21 25:9,12 30:18 31:9,10 31:12,14 33:20 34:4,5 34:18,22 gas-tight 39:4 gases 94:3 98:3 gather 165:14 gathered 8:16 143:12 gauges 83:22 95:14 gavel 61:18 general 1:16 4:20 38:8 50:15,16 61:19 63:7 107:7,19 120:11,16 120:22 121:8 174:14 generally 56:1 generated 20:2 30:6 71:17 79:18 105:11 generation 124:20 gentleman 127:9 171:5 171:18 gentlemen 17:4 48:14 167:4 geographically 161:21 Georgia 109:5 getting 88:20 157:6 Gilsonite 69:6,9 71:17 77:17 82:21 83:15 84:16 87:12,13,16 129:14 130:18 give 43:18 59:22 132:20 144:22 159:11 given 37:16 59:22 128:7 166:20 giving 12:18 115:17 144:6 Glenn 2:19 149:3,4 go 25:8 27:10 39:1 49:2 49:15 52:13 111:20 127:6 128:8 146:14 151:13 153:8 155:18 156:15 171:21 173:2 goes 156:4 going 3:14,17,19,21 4:2 4:6,11 15:20 42:13 145:10 149:8 150:22 151:19 152:2 165:15 good 3:3 13:4,6 17:4 22:2 48:13,14 54:8 59:9 62:18 65:19 134:20 137:2 140:16 162:10 167:6 170:1 172:20 govern 172:8 government 9:3 135:1 Governmental 90:8,15 91:18 172:19 grade 40:7 grain 143:1 graph 85:3,9 86:5 graphic 26:13 82:6 gravity 69:4 74:11 gravure 69:9 great 10:17 14:17 51:6 greater 87:18 98:6 132:18 141:16 greatly 141:18 Griffon 1:13 2:3 4:18 9:20 14:12,13 16:16 17:3 39:13,14 40:14 41:1 42:11 43:2 63:12 63:13 128:5,6,15,21 129:6 130:4,12,15 131:3,7,10,12 133:18 133:21 134:4 173:18 174:17,20,21 176:20 grips 159:13 ground 26:17 grounded 126:13,20 group 24:22 25:5 29:18 123:22 grouping 33:16 groups 33:21 Guard 29:13 guess 62:12 133:2 164:11 guidance 111:10 113:8 115:17 119:1 guideline 134:13,14 guidelines 122:21 125:9 128:14 134:9 175:17 176:11 guides 90:19 Gulf 26:21 Gunaratnam 1:19 2:15 67:10 106:5,7 119:21 120:17 H H 123:22 H-O-F-M-A-N-N 144:5 hails 9:5 halted 29:14 hammer 18:1 hammering 23:18 hand 102:13 handle 46:16 54:4 87:15 107:12 119:8 164:3 handled 56:1 handles 47:3 124:1 handling 47:10 91:10 94:7 116:6 124:6 138:8 happen 13:22 50:9 53:2 61:12 154:12 happened 24:11 30:17 50:13 52:12 129:1 134:2 happening 49:16 54:20 149:9 happy 43:21 140:6 152:17 154:2 hard 152:16 harm 167:6 hastened 167:2 168:4 hazard 93:16 99:20 100:13,15 103:1 104:4,20 110:5 112:3 115:21,21 117:14 118:1,4 125:4 138:18 142:8 148:11,11 172:6 hazardous 20:12 58:14 110:7 124:6 138:9 172:3 hazards 37:17,20 47:1 54:17 100:16 107:17 107:19 110:4,8,11,15 112:8,14 118:12,18 119:2,17 122:16 124:2 136:16 137:4 139:1,5,9,12 141:8 142:1 143:2 HAZWOPER 36:1 38:8 38:11,14 53:16 he'll 39:10 head 89:6 160:8 headache 28:8 header 30:3,22 headquartered 18:21 68:3 heads 80:12 health 13:13,15 15:15 28:11 51:4 54:10 90:20 107:5 113:14 120:3 125:17 136:12 152:22 175:12 hear 134:1 173:16 heard 37:13 48:18 77:18 78:7,17 82:8 84:22 85:17 127:7 128:2 145:9,13 149:19 150:2 155:10 155:11 hearing 48:22 63:6 66:8 144:22 174:12 hearts 49:2 heat 20:3,5 29:3 69:8 81:17 124:19 heated 80:3

(202) 234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. 188 heating 83:18 heavy 163:6 held 104:10 help 14:7 89:17 139:15 152:9 173:8 helped 80:12 98:9 helpful 51:19 her,e 70:5 high 20:18 24:6 31:19 44:1,1,6 70:22 106:3 high-hazard 123:21 138:5,11 high-powder 72:10 high-pressure 22:16 24:2 high-regulated 46:14 higher 72:11 87:14 highest 135:11 highlighting 142:14 highly 46:9 56:13 142:2 142:3 highly-regulated 46:21 hired 97:14 147:9,11,12 147:15 hiring 102:10 historical 153:12 158:18 history 54:21 110:17 121:4 158:19 hit 155:16 157:5 Hoeganaes 15:21 109:12 132:7 138:16 Hofmann 2:18 144:1,2 144:4,5 154:12,14 156:10 162:18,22 163:7 hold 165:16 holding 48:22 60:19 homes 75:8 honor 162:14 Honorable 9:4 hope 15:16 51:10,15,21 53:21 62:19 139:12 149:1 170:22 177:2 hopper 74:6,10,22 75:16,17 92:7 hoppers 69:5 Horizon 26:21 27:6,21 Horowitz 48:5,8 49:19 54:6 59:3,7 61:1,12 61:17 133:12 134:16 140:9,12 143:22 149:2 152:19 155:21 156:14 162:7 164:8 165:10 169:3,5,11,14 169:17 171:2,16 172:14 173:7,12 174:15,20,22 175:2 horrible 158:21 horrific 54:14 hose 78:12 156:8 hoses 96:12,16,20 126:14 hospital 28:1 29:4 hospitalized 17:17 27:16 hospitals 80:15 hot 21:15,19 22:16,17 22:19,22 23:1,8,11,19 23:20 24:1,21 25:9,12 30:18,21 31:9,10,12 33:20 34:4,5,18,22 hours 19:12 24:17 29:7 41:8 83:20 84:5 House 160:1 housekeeping 77:3,6 89:15,15,20 116:21 hovered 26:17 human 167:6 hundred 27:16 hundreds 141:6 hurt 10:14 hybrid 129:9,9,22 130:3 130:6,14 hydraulic 7:16 8:1 17:22 23:8,13 24:4,10 29:17 30:7 31:7 32:8 32:11 33:1,5 45:19 47:6 62:2 64:3,8,16 hydrocarbon 69:6 hydrocarbons 116:12 129:7 Hygienist's 90:8 hygienists 90:15,16 91:19 172:19 I I-Codes 135:15 140:2 IBC 123:20 136:5 137:8 138:4 139:10 ICC 135:2,3,5,10,14 136:4 137:13 138:19 139:4,17,21 140:7 idea 43:18 154:18 identified 31:5 42:20 52:16 88:22 99:18 108:20 110:19 126:11 149:22 158:7 160:11 171:14 identify 100:15 110:3 128:17 IFC 136:6,18,22 137:8 138:1,6,7,21 139:1,10 ignited 80:10 117:8 igniting 116:15 ignition 20:21 38:1 83:14,17 84:14,17 85:11 86:21 126:11 ignore 161:10,16 ignoring 161:11 illustrated 73:11 85:2 illustrations 139:9 image 19:6 89:18 images 93:3 imagine 36:16 immediate 32:15 71:7 103:21 immediately 24:20 27:8 67:6 70:8 78:3 103:9 103:19 156:4 impact 30:6 31:22 44:5 44:5 143:16 Imperial 109:4 132:7 implement 100:1,18 123:16 125:13 implementation 158:9 implemented 53:13 109:19 153:15 importance 161:22 important 15:1,17 33:18 49:6 52:22 85:5 133:19 146:21 149:18 150:20 151:1,2,11 158:19 162:5 impossible 42:4 114:21 impractical 114:21 improper 88:12 improve 12:19 72:13 139:13 improvement 72:14 112:10 121:2,14 improvements 57:14 171:11 improving 139:20 140:1 inadequate 5:11 99:19 104:5 inch 32:3 86:2 inches 97:9,9 98:7 incident 6:12 8:15 10:2 14:21 15:19 16:9 17:20 18:17 19:1 20:22 24:12,14,20 26:1,19 27:20 28:6,15 30:17 32:6,16 33:5 36:11 40:10 42:8 44:14 62:5 66:4 67:7 67:20,21 68:7,17 70:1 71:12 72:3 75:17 79:22 81:7 82:3 85:5 86:3 87:2 88:6,9,15 92:19 95:22 96:8 97:7 98:11 99:4,5 100:2 103:9 104:4,18 105:3 105:8,16 109:15 110:1,19 111:13 118:2 126:1 127:13 128:12,16 129:1,9,22 130:5,17 132:10 158:21 159:1,21 161:20,22 162:1,3,15 177:5 incidents 14:9,16,18 32:11,17 33:2 36:9 43:17 44:1,7,9,13 62:18 106:19,20 108:21 109:1,11,22 110:17 112:1 125:18 132:7 133:3,6 159:9 include 44:20,21 56:19 58:18 104:13 110:6 116:21 118:19 123:22 125:16 139:4,8 163:10 175:10,20 176:13 included 28:9 46:12 52:7 87:11 includes 15:1 18:14 47:3 115:14 137:20 153:2 including 4:22 5:10 8:9 32:19 59:13 73:13 76:1 83:18 94:19 99:19 101:16 110:1 125:9 138:10 141:4 157:5 174:2 inclusion 97:4,15,18 incorporate 147:13 Incorporated 62:5 Incorporating 98:7 incorporation 139:1 increase 56:2 74:16 85:10,12 increased 166:15 increases 22:20 55:16 increasing 168:3 incredibly 149:17 indentation 167:17 independent 5:7 74:20 75:11 152:4 indicate 37:3 87:16 indicated 71:16 79:22 95:6 100:13 130:21 163:5 indicates 122:9,17 indicating 79:3 indication 35:21 36:13 37:12 166:11 indications 37:5 indicative 85:13 indicators 95:12 104:12 105:22 117:4 126:17

(202) 234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. 189 individual 33:21 individuals 144:9 166:13 industrial 7:17 15:16 19:14 20:10 29:14 32:12 47:5 62:2 64:9 90:8,9,15,16 91:19,21 122:12 124:9 140:22 172:19,21 173:1 industries 4:1 5:2 15:2 20:11 43:18 44:7,14 55:14 57:8 110:10,14 110:16,19 118:22 122:1 176:1 industry 5:12 8:3 9:8 13:11 15:8 17:21 32:13,19 43:15,17 44:10 45:7 46:9,14 47:3,16,17,18,19 56:22 57:12 64:2,10 64:14 107:2,7,11,14 110:20 111:4 115:15 118:15,21 120:11,16 120:22 121:8,21 134:10 141:6 143:14 148:21 172:20 industry's 58:9 ineffective 95:21 96:2 99:20,21 inefficiency 92:2 inefficient 95:21 inference 165:9 inform 124:7 informally 154:19 information 38:18 39:8 39:11 75:22 90:18 95:13 100:12 102:2 104:14 124:11 125:15 125:19 130:21 139:8 143:11 154:1 informed 57:14 infrastructure 141:17 ingredient 69:18 ingredients 68:14,15 68:22 69:15 76:5 105:4 inhalation 58:19 inherently 38:21 initial 66:10 67:6 79:8 86:10 93:20 94:9 102:8 104:9 109:20 125:16 129:16 144:18 145:8,14,19 170:16 171:3 initiate 145:19 initiated 110:12 132:4 initiates 22:11 initiating 41:4 initiation 34:5 inject 74:19 75:10 injection 74:21 75:12 injured 49:3 80:7,13,14 80:15 109:6,10 141:10 144:9 153:7 162:15 167:4 injuries 8:4,16 17:15 29:4 66:6 80:7,10 98:22 103:12 105:15 108:22 166:13 injuring 28:21 injury 10:14 28:21 44:3 ink 2:12 4:6,9,13 5:2 6:12 7:14 8:13,17 10:2,6 11:18 15:19 16:3 49:2 64:22 65:7 65:9,14,21,22 66:2,7 68:2,8,10,10,11,13,15 68:18,19 69:3 70:4 71:19 72:6,9,15,17 74:8 75:2 76:3,10,11 76:22 77:14 79:21 84:2 87:7,8,10 91:16 91:22 92:18 93:15 94:11 95:6,11 96:11 96:18 97:13 98:12,15 98:18 101:13,18 102:3,6 103:1 104:17 105:5,9,17,21 106:2 106:10,14,16 107:13 109:14 110:1 111:1,2 111:6,13 112:1,14 113:2,20 114:14,14 116:2,6 118:20,21 120:5 121:22 124:16 126:1 141:9,13,21 142:2 144:10 147:7,9 153:5 163:11,14,14 163:15 164:2,9,15,18 165:5,7 171:14,17 173:21 175:13,22 176:9 Ink's 99:13 116:13 118:1 INK/MILLARD 1:3 Ink/Sun 75:21 93:9 97:14 101:10,19 117:10 118:8 124:15 124:22 125:12 173:22 inks 69:8,9 inlet 75:1,19 inner 129:20 inrush 31:18 ins 170:5 inside 17:13 25:19,22 29:11 30:1 31:7 37:3 37:11,14 38:6 82:1 85:11,13 106:13 115:14 167:10,14 inspect 111:11 115:7 115:18 inspected 39:22 86:13 111:5 inspecting 151:18 inspection 40:15,16,17 53:1 97:7 110:14 111:14 143:12 150:5 inspections 40:18,21 56:20,21 86:16 110:10 119:2 132:19 137:21,22 inspector 122:21 inspectors 119:1 install 105:22 124:17 176:9 installation 75:4 93:11 97:19 99:16 101:1 102:11,19,21 117:12 118:10 124:8 135:20 151:20 164:5,11 installations 125:2 installed 66:9 71:1,11 72:12,21 93:13,19 96:4 104:21 117:4 installing 94:15 instance 127:19 160:12 160:16 instances 36:9 instantaneous 157:15 institutions 32:21 instructed 27:10 instruction 76:14 insufficient 116:22 118:17 insulation 26:11 intact 55:3 integrity 53:2 intend 150:3 intended 32:17 91:5 116:19 146:8 intensified 110:9 intensive 17:18 27:17 intent 111:8 113:13 136:21 interaction 173:3 interchangeably 165:6 interest 51:6 61:4 170:5 177:1 interested 12:15 173:10 interesting 166:8 interior 86:13 91:1,13 interlocks 34:3 106:1 internal 97:5,15 international 19:5 25:17 115:9,15,19 116:4 119:5 123:20 134:18 135:2 136:3,5 136:6,9,18 138:19 140:22 interpretation 104:12 114:18 interpreted 165:6 interrupt 168:8 interrupted 23:22 29:18 31:10 interrupting 21:18 interruption 34:7,11,13 intervals 40:17 interviews 100:20 101:18 103:22 introduce 8:21 16:17 16:20 18:13 65:17 67:1,22 introducing 34:22 investigate 10:5 82:15 108:19 111:22 159:8 investigated 16:2 67:1 83:4 106:18 109:1 investigates 5:8 investigating 106:18 investigation 8:11 10:4 11:11 17:7,8 18:6 32:5,9 33:11 35:15,16 37:9 38:12 42:20 45:3 46:18 51:14 53:10 54:1,13 65:21,22 66:16 67:2,5,17,22 83:11 108:7 114:5 116:9 119:22 121:16 121:18 122:18,22 125:22 138:14 139:19 144:20 153:11 157:22 163:4 166:6,19 167:5 170:6 investigations 1:17 3:11 5:9 8:7 11:13 12:6,12 16:19 44:20 44:21 50:10 54:17 97:12 109:16 investigative 4:10 5:1 7:7 12:8 18:13 45:15 50:3 120:1 investigator 1:17,19,19 1:20 16:18 17:2 18:15 18:15,16 21:21 22:2 33:12 36:3,22 37:7,18 38:9 40:1,19 41:12 42:15 43:21 45:9 46:17 65:19 67:8,10 67:11,12,13,14 81:1 88:4 99:10 106:7 119:20 126:15 127:5 127:17 128:13,19

(202) 234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. 190 129:5,11 130:9,13,20 131:5,9,11,14,19 133:5,9,14,20 134:3,6 151:12 153:22 155:8 155:14,17 156:3,6 157:7,12,18 163:4 167:7 168:6 investigators 2:7,16 3:18 16:20 48:2 51:8 79:20 100:21 126:6 investigatory 4:10 invite 6:2 35:12,14 invited 18:8 66:18 involved 10:3 13:17 42:18 68:19 87:2 102:8,17 124:2 127:15 131:22 147:9 148:1,5,10,12,16,18 160:18 164:10,15 involving 6:12 14:21 105:3 106:17 109:11 iron 109:13 irritating 20:14,17 irritation 28:9 isolate 35:6 41:20 42:2 42:5 98:16 isolated 23:20 34:4 35:4 146:7 isolation 74:21 75:12 75:18 76:1,16 82:10 82:11 85:15 86:6 87:10 97:1,20 98:14 99:2 145:10,17 146:3 146:14,17 147:14 issuance 108:17 120:16 issue 3:16 16:5 89:3,13 90:3 92:22 93:7 95:7 95:20 107:9 111:16 120:4 151:4 156:19 175:16 176:12 issued 109:20 132:5 159:10,14 160:5 issues 13:15 24:18 32:7 36:14,16 52:4,6,7 57:2 58:6 87:22 89:1 90:20 99:18 148:3 152:3 153:13 160:11 162:3,21 176:6 item 112:9 121:13 items 95:5 J Jaje 65:8 January 1:7 9:16 60:12 Jerry 160:5 Jersey 4:7 6:10 7:13 8:10,14,20 9:5 10:10 12:13 13:5,9 38:19 39:9 43:15 55:5,10,22 56:4,7,11 57:13,16 59:14,16 64:14 66:3 68:4 112:13 113:5 114:6,11,17 115:8 118:12 119:4,12,15 120:6 123:4,7,10,15 123:19 124:4 136:6,8 141:10 149:14 150:11 159:2 160:6 173:22 175:12 176:3,4,5 Jersey's 10:9 55:11 56:10 57:9 58:2,9,21 112:17 113:3,11 116:3 149:22 jobs 141:7 John 2:9,10,20 39:9 49:20,20 59:7,9 65:8 169:7,11 Johnnie 1:17 2:5,13,15 12:8 16:19 18:14 67:8 Johnson 2:17 134:17 134:19,20,22 140:9 150:2 160:7,7 join 140:19 162:17 joining 4:19 9:11 43:6 joins 9:7 joint 173:5 jointly 52:18 Jr 1:12 4:19 9:1,4 July 16:1 112:3 120:20 June 108:11 jurisdiction 113:10 122:11 jurisdictions 150:3 151:15 152:13 justification 145:15 justified 55:21 56:6 justifies 145:11 justify 55:6 K kaolin 68:22 69:5 keep 55:3,4 58:21 91:13 key 7:16,20 17:8,20 18:10 32:16,18 47:7 62:1 68:12 116:10 killed 109:6,9,12 159:2 kind 9:1 35:19 47:12 101:2 150:19 169:10 169:19 kinds 159:9 161:18 164:20 knocking 23:18 know 5:6 6:13 9:1 36:21 37:20 38:6,9 41:6 42:16 47:14 49:8 58:19 64:6 95:17 130:7 149:20 152:8 153:20 154:8,12,17 161:6 163:2 164:7 170:21 172:20 173:2 knowledge 64:8 72:22 102:1,13 125:15 172:14 known 18:1 47:18 69:3 122:16 141:1 Krzystof 65:8 Kst 76:5 87:3,11,13,14 L L-shaped 80:1 lab 130:1 labeled 68:21 labor 54:2 152:20 153:1 158:12,14 lack 93:7 95:8 148:13 163:19 lacked 101:20 ladies 17:4 48:13 land 55:6 large 13:21 21:4 26:5 27:3 50:20 51:12 55:17 70:3 80:3 81:15 86:16 large-capacity 33:18 larger 97:8 98:8 Lashkari 1:18 2:6 18:16 33:9,12 43:21 lastly 9:22 53:20 late 10:1 latest 135:19 launched 106:22 Lautenberg 10:1,17 law 46:15 161:10,11 162:13 laws 54:19 55:1,3,9 lead 12:9 72:17 88:2 leader 10:17 leaders 15:8 leadership 158:2 leading 16:18 24:9 116:15 leak 41:3 leaking 26:10 35:6 lean 52:17 learn 46:6 learned 7:21 8:6 13:19 15:6 32:9 33:10,14 37:10 38:11 40:7 45:6 45:8,20 46:3 52:5 64:1 100:22 105:18 114:3 125:18 143:13 170:9 leave 6:19 51:22 led 12:8 32:7 55:10 84:17 88:14 89:8 90:6 106:14 117:6 166:16 left 4:19,20 26:8 30:10 63:11 72:22 77:22 80:17 163:2 167:18 leg 28:21,21 legacies 10:20 legislation 57:20 legislators 57:7 length 96:17 lengths 96:12 lent 45:18 lessons 7:16,20 8:6 13:19 15:1,6,17 17:8 17:20 18:10 32:9,16 32:18 33:10,14 45:6,7 45:20 46:3 47:7 50:21 52:5 62:1 64:1 105:17 125:18 143:13 170:8 lethal 64:6 letter 6:14 10:11 letters 163:11 level 45:1 79:17 136:11 137:3,12 levels 52:8 72:11 85:22 136:20 137:10 138:3 Levitt 2:10 61:7,8,9 life 10:15 39:21 135:10 137:12 138:2 167:6 lifetime 10:8 light 49:6 142:16 143:18 lights 79:2 liked 144:20 likelihood 161:11 limit 12:3 35:9 limited 50:11 52:3 56:20 96:7 104:6 165:21 line 24:19 30:8,12 92:11 92:15 link 51:19 liquid 18:1 20:3,4,7 21:5,8 22:10,12,14,15 23:2,3,10,16 24:8 25:11,13 30:6,18 31:2 31:11,13,18,19 34:3 34:20 68:14,14 list 17:20 53:18 94:18 111:3,4 118:22 119:1 121:14 122:1,10 175:22 listed 58:13 122:13 lists 55:19 58:15 literature 46:22 little 39:17 53:8 131:5 133:22 145:1 147:19

(202) 234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. 191 153:12 156:18 live 10:15 13:9 lives 13:18 14:9 106:21 141:11,15 load 34:22 loaded 19:4 loading 25:17 28:18 77:17 local 35:22 71:6 81:5 113:9 114:2 115:6,17 119:13 123:11,17 124:7,10 151:15 152:1 169:21 localized 23:13 locals 60:7 locate 42:2 located 19:13 21:6 30:1 37:11 70:10,12,18 73:5,16 74:21 75:12 75:15 82:5,11 107:16 location 19:1 42:3 103:4 locations 11:2 31:3 lock 74:9 Lodi 159:2 Loeb 1:16 4:21 17:4 63:7,9,15,17,19 lofted 72:1 logic 25:7 long 34:19 49:7,15 108:9,15 155:12,22 long-term 28:13 long-time 54:21 longer 59:21 look 9:18 43:10 51:16 53:12 61:4 62:20,21 70:5 148:19 173:6 looked 37:9 46:18 52:20 53:3 165:11 looking 68:8 losing 28:20 loss 15:13 24:16 41:5 41:14 97:13 143:4 159:18 lost 13:18 60:5 lot 12:16 46:15,22 47:17 51:12 60:7 62:18 151:9,9 159:3 159:21 loud 66:8 78:7,9 82:8 louder 128:1 low 22:5 23:20 24:6 34:22 88:16,16 89:2 90:5 93:2 low-temperature 21:4 22:12 23:10 24:3 34:3 lower 56:6,14 131:6 Lucy 1:17 2:6 18:15 M M-O-R-A-W-E-T-Z 50:2 169:16 magnitude 57:7 64:4 158:22 main 46:2 maintain 142:3 maintained 39:22 108:15 138:3 maintaining 159:7 maintenance 40:14,20 77:3,8 136:19 137:11 major 88:13,22 92:22 95:7,20 109:1 156:13 172:22 majority 141:5 makeup 89:22 making 15:7 41:6 74:8 87:8 96:17 160:18 malfunction 104:8 man 70:11,19 manage 69:17 101:8 managed 100:4 management 5:13 29:5 36:11 41:15 46:20,20 52:18 53:14,15 54:2 72:13 97:14 99:7,13 99:14,18 100:9,14,21 101:11,21 117:14,15 125:5,7,13 154:9 158:4 160:13,21 172:3 management's 158:10 162:3 managements 161:14 manager 13:12,12 42:16 managers 160:18 161:17 managing 48:4 67:15 Mandated 58:13 mandatory 56:20 113:12 161:1 manifold 29:22 Manny 1:12 2:3 4:19 9:1,4 13:1 manual 34:13 69:2 90:9 172:21 manually 34:17 77:7 103:7 manuals 90:19 manufacture 44:15 72:18 75:22 123:6 170:4 manufacturer 104:10 148:4 manufacturers 87:9 171:17 manufactures 68:11 manufacturing 8:13 38:20 40:5 44:12 66:2 68:18 91:9 92:18 94:7 98:18 109:5,13 111:2 111:7 114:11,15 118:20 121:22 124:9 124:19 138:12 140:21 142:4 163:15 171:15 175:22 March 57:17 Maria 67:10 marine 19:2 Maritime 19:16 Mark 1:13 2:3,9 4:18 54:6 133:14 material 20:12 69:2 72:5,13 73:7 78:12 83:14 86:14,19 88:8 89:1 91:3,14 93:1,4 95:18 129:18 130:18 130:22 131:2,21 132:20 146:16 materials 6:19 72:5 76:2 86:17 96:9 106:13 115:22 124:7 130:18 132:2 138:9 matter 48:19 65:2 177:14 matters 89:17 maximum 86:1,3 McDonald 2:9 54:7,8 59:4 mean 47:13 128:21 157:15 168:11 meaningful 49:14 means 56:10 71:20 measure 87:4 measured 87:5 Measurement 94:20 meat 19:3 51:8 mechanism 47:5 54:1 107:18 medical 27:19 meet 39:19 95:3 meeting 1:5 3:4,9 4:15 5:5 7:6 9:7 11:3 13:6 15:22 16:1 40:16 51:5 52:15 53:22 59:21 60:11,12,16,18,19,21 61:19 64:20,22 65:5 65:10 88:3 104:10,13 112:4,8 126:1 168:18 171:18 176:22 177:11 177:12 meetings 60:2,7 61:3 meets 93:22 melt 21:16 22:17,21 melting 78:14 melts 22:22 member 1:12,13 8:22 13:1,3 14:13 17:3,3 35:18 36:18 37:1,15 38:5,17 39:14 40:14 41:1 42:11 43:2,8 60:17,20 61:21 63:13 63:16 126:9,21 127:14 128:4,6,15,21 129:6 130:4,12,15 131:3,7,10,12 133:18 133:21 134:4 172:18 173:18 174:6,17,19 174:21 members 1:10 4:18,22 4:22 9:20 12:22 13:20 17:14 18:9 27:13 35:15 37:17,21 48:14 50:5 52:10 63:3 65:17 66:18 81:10 134:21 140:17 141:3 142:1 145:6 149:6 membership 135:3 men 141:6 143:7 Menendez 5:22 7:3 mention 53:8,15,16 57:1 147:17 158:17 172:5,7,11 mentioned 37:1 43:13 52:10 75:13 120:17 128:9 129:7 141:4 147:2 151:12 169:9 169:20 mentioning 172:13,13 mentions 147:19 mercury 58:16 message 64:13 175:7 messages 176:17 metal 30:13 109:8,11 132:1 141:6 metallurgical 40:13 meter 87:6,11 method 51:22 137:14 methods 135:21 Mexico 26:22 mezzanine 70:13 Michael 1:18 2:13 67:9 microphone 3:20 6:2 middle 9:15,17 70:10 89:18 Mike 88:5 mile 27:1 Millard 2:4 3:15 4:1 5:1 7:10,22 8:7 11:16 14:22 16:21 17:6,10 17:13,15 18:13,18,22 19:3,7,16,20 21:1

(202) 234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. 192 22:9 23:4 24:11,16 25:16 26:3 27:1,14 28:16,19 29:1,10 32:6 33:5,10 35:16 40:4,19 41:14 42:20 44:15 45:10 46:19 50:19 62:4 millimeters 58:16 million 19:9 29:9 39:7 milliseconds 85:14,19 157:17 mills 143:2 mind 49:20 minimize 91:5 98:9 minimum 90:12 91:20 93:2 125:3,16 136:10 136:20,22 137:10,11 138:2 minor 170:10,22 minus 22:10 30:14 31:11,13 minute 74:3 91:17,21 92:2,4 minutes 12:4 23:5 65:1 81:7 82:16 146:18 156:7 157:4,9 mis-spoke 133:16 misinterpreted 114:1 missing 146:22 mission 135:10 missions 50:10 mists 94:3 98:3 mitigation 138:18,22 139:11 mix 71:10 127:21 mixers 76:20 77:1 mixing 8:17 66:7 68:13 68:15,20 69:1,17,18 70:3,21 72:6 73:14,20 74:12 76:18 77:8,20 83:18 84:2,2 86:9 89:10 95:14 96:11 98:19 105:4 106:2,12 117:5 118:6 124:19 156:9 mixture 79:15 82:20,22 83:15 84:13 89:10 92:9,18 116:11,14 117:1,7 129:19 130:14 mixtures 80:4 93:4 Mobile 7:10 19:15 27:18 28:11 29:5 36:15 38:3 mobility 96:16 MOC 100:14,18 101:4 125:5 mode 21:18 25:9 34:12 model 55:12 57:5 115:10 135:6,22 136:7,9,19 137:17 140:7 150:2 moderate 133:13 moderator 166:4 modifications 125:2 modified 116:20 modify 113:6 modules 76:19 moisture 20:15 21:9 moment 11:2 12:2 Monday 77:10 monitor 95:9 117:5 monitoring 56:17 71:6 month 33:7 months 177:6 moral 10:14 Morales 2:8 48:11,13 48:15 49:18 Morawetz 2:9,20 49:20 50:1,1 169:7,8,13,16 169:18 171:5,19 172:15 173:11 morning 24:21 76:8 77:13 motion 61:21 62:7,8,11 62:15,15 63:9,19 173:19 174:7,16 motions 173:16 mounted 73:10 Moure-Eraso 1:11 2:2 3:3 4:17 6:5,22 7:5 9:14 14:10 16:15 35:13 39:12 43:3 44:17 46:7 47:9 49:17 59:5 61:16 62:10,13 63:2,5,18,20 65:4 126:2,3 128:5 131:15 133:1,7,10 134:7,12 134:21 140:10 143:21 168:7,15 169:4 173:14 174:4,8,12 175:1,4 move 45:12 61:17,21 62:12 65:13 142:16 166:7 173:19 moves 20:3 moving 48:2 96:16 multiple 25:20 33:16 129:12 Musaki 67:10 mute 11:7 N NAIC 110:21 111:1 118:19 NAICS 121:22 122:13 name 12:1 49:21 61:9 134:22 140:15,19 144:2 152:21 162:9 169:14 NAPP 159:1 161:22 narrowly 52:12 nation 43:20 142:5 143:5 national 36:11 62:21 69:9 91:3 94:1,13 97:22 110:13 111:8 123:17 124:18 142:22 153:1 160:8 175:19 176:2,10 nationally 137:1 native 13:5 natural 57:7 nature 92:16 nausea 28:9 near 26:17 27:20 75:7 80:2 95:14 nearby 7:13 8:14 20:21 29:6 57:2 158:21 Nebraska 18:22 necessarily 145:16 171:20 necessary 91:13 95:3 160:2 necessity 142:15 neck 80:18 necks 80:12 need 11:6 36:5 49:6 51:13 57:8 81:22 101:16 115:6 129:3 132:16 142:14 160:13 160:19 needed 16:7 118:14 120:12 121:9 needs 146:20 NEP 111:10 118:22 122:2,8,10,15 123:2 never 13:22 114:3 new 4:7 6:9 7:13 8:9,14 8:20 9:5,19,20 10:8,9 12:13 13:5,9 38:18 39:9 43:15 55:5,9,11 55:22 56:4,7,9,11 57:9,13,16 58:1,9,21 59:13,13,14,16 64:14 66:3 68:4 72:9,12,19 76:6 88:13 93:12,17 94:15 100:5 101:4,9 101:12,14 102:2,9,15 102:19 109:9 112:13 112:17 113:3,5,11,21 114:3,5,6,10,17 115:8 116:3 118:10,12 119:4,12,15 120:4,6 121:19 123:4,7,10,14 123:15,19 124:3,4 125:2,15 135:18,20 136:6,8,21 137:11 138:10,17 141:10 147:1,3 149:14,22 150:11 159:2 160:6 160:18 168:12 170:14 170:14 173:22 175:12 176:3,4,5 newest 13:1 newly 66:8 93:19 96:4 104:20 news 69:8 newspaper 163:16 NFPA 69:10 91:4,7 95:5 119:14,16 123:18 125:9 128:11 139:3 142:21 153:19 158:11 NFPA-654 94:5 107:12 116:1,8 119:9 125:10 133:16 150:17 154:7 NFPA-72 124:18 NFPA-91 94:2,14 98:1 nice 13:8 14:14 night 77:10 128:7 NIMS 36:11 nine 50:5 59:12 NJAC 123:8 noise 77:18,19 78:17 non 92:5 non-combustible 94:4 98:3 non-compliance 161:8 non-regulatory 5:7 non-trained 52:17 normal 15:11 20:13 21:18 85:21 normalized 76:4 north 110:20 121:21 151:7 Northeastern 59:12 note 11:2 12:3 78:16 85:5 162:16,22 noted 121:3 162:18 163:19 notice 26:9 59:20,22 114:17 130:8 noticed 79:2 notification 103:18 155:17 notified 81:5 103:20 157:1 notify 78:21 110:8 Notta 39:9 November 15:22 108:1 108:14 nozzle 75:16 167:17

(202) 234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. 193 Ns 144:5 149:5 number 4:21 28:2 38:21 44:6 46:10 50:14 52:10 56:3 112:16 132:2 numbers 62:17 132:8 numerous 147:2,9 O O-F 2:1 oath 156:12 object 168:16 objective 90:17 Observation 79:20 observations 79:12 observe 102:21 167:16 observed 78:20 79:9 81:14 82:3,17,18 127:20 129:16 145:14 obstruction 31:20 obtain 101:17 112:15 112:16 113:2,18,21 118:9 obtained 83:8 95:1 obvious 150:8 obviously 55:15 occasion 61:3 occasionally 104:2 occasions 152:7 occupancies 115:16 123:21 124:6 138:5 138:13 occupancy 115:13 occupant 136:13 137:3 occupants 113:15 136:14 occupational 90:20 107:5 120:3 175:11 occur 8:2 15:4 18:2 20:19 23:14 124:20 131:21 142:8 occurred 7:12 8:13,15 17:9 24:14,20 25:19 26:1 37:21 49:2 66:1 66:4 68:17 75:17 82:2 83:13 86:12 96:1 105:4 106:20 108:21 109:4,7 117:22 126:18 128:17 155:7 157:4,16 174:1 occurrence 98:10 141:13 occurring 32:12 33:2 55:2 62:5 111:10 177:2 October 8:15 10:4 66:5 68:16 72:3 76:8 77:2 77:10,12,13 88:14 89:17 96:1 106:15 111:13 174:1 odd 77:19 odor 20:14 off-site 26:19 27:12 28:2 39:5 offer 18:8 66:18 140:5 offered 96:2 127:12 office 78:5 offices 122:5,10 officials 113:9 114:3,22 115:6,17 119:14 123:11,17 139:7,13 offshoot 45:15 oil 26:21 oil-based 68:11 oils 76:4 129:13 oily 90:6 129:19 okay 7:5 37:1 38:22 41:1 61:12 62:10 63:5 65:4 126:21 128:15 128:21 129:5 130:4 130:12 131:3,10 133:10 154:17 156:17 157:11,19 165:3 168:14 172:15 old 40:10 47:18 101:2,5 Omaha 18:21 on-site 15:10 once 71:4 169:14 one-foot 82:17 one-half 85:8 one-shot 170:18 ones 5:4 ongoing 140:3 open 24:1 25:11 69:13 120:20 121:12 135:16 opened 30:19 81:21 opening 2:2 3:13 12:22 24:5 34:11 operate 8:9 15:10 76:11 142:3 158:5 operated 18:18 19:7 76:9 88:16 89:7 operating 30:14 36:10 72:15 85:21 operation 15:2 23:12 34:1 47:5 52:6 68:15 71:18 83:19 84:4,12 88:12 89:11 92:10,14 92:19,21 93:6 106:2 127:16 operational 32:7 52:6 76:13 operations 7:18 26:20 100:17 125:20 137:7 operator 25:1 42:17 77:15,17,19 78:16 95:17 operators 24:17 25:15 33:1 69:17 76:13 95:9 95:16 104:22 117:5 125:8 opportunity 11:15 18:3 36:5 60:1 66:13,22 140:5,18 142:11 144:7 166:10 172:10 173:4 opposite 78:4 opted 75:3 option 45:8 options 44:19,20 order 55:3 ordered 29:6 ordering 102:11 orders 158:22 organization 14:4,5 171:6,13 organizational 101:21 125:13 organizations 51:21 158:11 172:2 organized 5:5 oriented 170:14 origin 83:5 126:16 original 108:2 116:18 176:14 originally 87:20 originated 80:4 83:9 originating 78:1 82:4 Orville 2:8 48:10,15 OSHA 6:15 8:19 36:20 38:15 45:5 46:13 49:13 52:11 53:5,8 107:6,8,16 108:3,4,7 108:9,11,15 109:17 109:20 110:3,9 111:13,15 112:5,11 118:13,19 119:1 120:4,5,11,16 121:8 121:11,20 122:4,5 142:18 143:3 159:7,9 159:12,14 160:5 172:7,11 175:16,21 OSHA's 111:3 142:16 172:9 OSHA/EPA 160:1 outage 25:3 34:6,10 35:1 41:7,16 outcomes 132:8 outdated 57:13 outdoor 112:20 outdoors 27:2 outs 170:6 outside 37:5,12 81:13 93:10 102:16 163:6 outward 80:1 over-relied 93:10 overall 72:14 overcome 28:17 overdue 49:8 overhead 69:4 71:10 overheating 105:4 117:7 overnight 76:22 override 34:17 oversaw 102:11 overseen 113:4 oversight 56:16 99:15 99:19 102:7 117:11 150:4 164:10 overview 18:4 66:13 67:19 73:4 owns 164:19 Oyewole 1:19 2:14 67:13 88:2,4 99:11 130:9,13 P P-A-U-L 144:4 P-I-A-N-T-I-N-O 162:11 P-R-O-C-E-E-D-I-N-G-S 3:1 p.m 76:10 77:16 packaged 19:2 page 36:8 166:14 paid 151:18 pain 28:10 panel 70:17,17 75:3 79:3 paper 140:20 141:5 paragraph 94:18 122:8 122:17 parameters 93:22 95:8 Parisrom 67:12 part 16:11 35:22 51:2 64:19,22 96:20 111:6 114:14 133:11 147:4 166:19 175:13 PARTICIPANT 6:8 62:8 62:11,14 134:10,14 165:15 participants 177:10 participate 60:1,8,18,21 participated 67:2 177:11 participating 9:6 participation 176:21 particles 73:15 particular 13:16 42:3,8 43:1 48:19 51:1 150:10,15 151:20 152:14 161:20 170:12 170:21 172:7,12

(202) 234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. 194 particularly 4:9 6:11 71:19 148:19 152:10 167:1 particulate 72:4,11,13 73:19 91:10 94:4,8 98:3 particulates 75:7 90:11 parties 164:15 165:1 partner 162:12 parts 31:18 39:6,16 96:16 party 97:13 123:12 164:18 Pascrell 5:20 6:1 48:12 48:16,20 49:13 pass 61:18,19 password 34:15 pat 176:1 path 80:1 pattern 122:16 Paul 2:18,20 144:1,4 162:8 pay 158:3 people 13:7,8 14:6 38:5 50:4 52:8 56:12 127:2 141:11 150:22 152:1 153:6 155:3 158:13 159:2 160:4 171:10 177:10 percent 44:9,13 92:2 perform 93:15 performance 89:2 93:13,19,22 94:16 95:9,12,16 105:1 135:13 performed 68:16 88:5 93:11 95:6 102:18 122:19 167:14,19 period 133:3 periodic 137:22 periodically 21:12,16 74:4 periods 35:1 permit 101:11,17 112:17,19,21 113:3 113:19,21 114:6,12 118:9 124:12 permits 112:16 125:6 Pernesky 65:8 personnel 34:16 99:15 125:15 170:14,15 177:4 Peter 2:10 61:7 Petroleum 69:15,19 Ph.D 1:11,19 PHA 100:13 101:3,13 101:14 125:4 pharmaceutical 132:1 phase 20:2 phenomenon 45:20 47:8 phones 11:8 phonetic 48:11 54:7 59:8 61:7 67:11,12,15 134:18 140:13 147:13 147:13,16 152:20 photo 25:22 26:8 27:4 30:10,12 photos 29:21 30:2 89:6 physical 5:10 92:16 115:12 physically 141:13 Piantino 2:20 162:8,10 162:11 165:3,13 166:3 168:1,14,20 pick 171:10 picked-up 90:1 picture 92:8 pieces 29:19 42:6 pilot 13:12 pinpoint 126:16 pipe 30:4,9,14 31:7,12 40:3,7,7,9,22 42:7 74:9 pipes 26:12 40:8 piping 17:13 18:2 21:22 22:5 23:6,14,18 24:9 25:14 26:4 29:22 31:3 31:22 32:2,3 35:11 39:19 40:6 53:1 69:2 place 9:15 10:18 41:10 43:9 44:4 53:6 58:22 85:1,7 117:17 129:1 137:18 148:17 161:19 162:1 placed 17:18 27:17 162:18 places 82:15 plan 16:11 36:1,19,20 41:22 46:20 70:2 103:2,8 104:3 118:2 126:22 172:6 planning 35:21 36:1,6 99:16,21 117:11 130:5 plant 13:12,12 14:8 38:6 42:16,17 68:10 71:15 77:3 80:13 81:10 100:7 103:5 104:5 125:7,20 127:12 155:3 159:1 plant-wide 155:11 play 150:6 please 6:2,7 11:2,7,21 12:3 48:7 49:12 57:15 140:14 144:2,22 162:8 pleased 14:3 plugged 89:19 92:21 plus 147:14 pneumatic 68:19 podium 33:9 point 38:17 50:6 61:2 62:16 65:13 78:21 99:6 126:16 133:15 155:1 164:9 170:22 pointed 13:4 160:9,10 points 39:18 74:22 75:13 76:3 83:5 170:11 policies 54:19 55:3 policy 100:9 101:14 172:12 Pollution 112:18 poor 171:4 poorly 147:4 populated 55:22 population 56:7 Port 109:5 portion 41:13 65:20 66:14 87:21 portions 98:5 pose 115:20 position 43:8 71:14 165:12 positioned 71:9 positions 13:11 possess 40:11 possibility 91:6 possible 37:22 69:21 83:4 86:21 96:17 126:13 129:12,15 post 85:4 post-accident 111:11 111:14 post-incident 167:15 postponed 108:10 potential 8:4 15:13 37:17 56:3 62:22 75:5 104:19 110:18 118:4 130:6 142:7 148:11 150:9 poultry 19:3,10 25:18 51:8 pounds 19:9,20 26:7 29:9 32:4 56:5,10 86:2 92:9,11,12 powder 68:20 109:13 powdery 82:20 83:15 93:4 129:19 132:2 power 25:3 34:6 35:1 41:7,16 powers 158:12 practice 96:15 137:2 practices 90:10 93:20 97:3 pre 71:9 127:20 pre-emergency 35:21 pre-incident 36:6 pre-mix 68:16 69:19 70:3,9,16,19 71:2,11 72:9 73:7 74:13 76:3 76:7 77:5,15,16 78:4 78:10,15 79:2 80:2,6 81:4,11 83:3 103:14 104:22 precarious 159:6 precautions 69:11 precedent 156:19 prefer 55:15 prematurely 30:19 preparation 77:11 prepare 104:7 prepared 5:5 17:7 65:21 173:16 prescribe 84:3 presence 103:3 106:12 present 1:10,15 5:19 7:7,21 17:7 20:20 27:2 30:21 31:11 33:9 57:8 65:21 67:20 129:8 168:16 presentation 2:4,12 3:14,18 4:2,6 16:21 17:19 18:6 65:14,16 65:20 66:15 67:18 80:22 87:21 99:8 106:4 125:22 128:10 presentations 11:14 165:18 176:7 presented 87:18 presenting 11:11 preside 48:6 president 13:13 135:1 press 51:18 pressure 23:14 24:6,6 31:15 40:5 58:15,16 74:16 79:3,18 84:14 84:18 85:6,10,12,21 86:1,4,6 87:3 94:21 95:13,14 117:4 146:15 166:15 167:13 168:3 pressures 9:3 pressurized 76:4 84:20 pretty 167:18 prevalence 43:16 131:18 prevalent 131:17 132:13 prevent 5:15 17:21 32:11 46:6 54:20 72:8

(202) 234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. 195 96:5 98:9 107:3,10 111:9 112:22 120:12 121:9 139:15 143:10 143:14 146:4 165:12 prevented 8:4,5 55:1 64:11,16 98:21 110:2 143:8 166:22 preventing 7:16 33:1 49:15 62:2 177:1 prevention 32:17 47:7 55:12 58:2,22 91:8 94:5 97:13 104:18 118:3 123:18 135:4 142:12 143:1 164:16 175:19 176:11 preventive 40:20 previous 100:2 105:18 120:2 125:18 127:3 price 158:3 primary 50:7 69:7 88:11 print 171:17 printing 111:2 118:20 121:22 163:16 175:21 prior 24:15 34:11,21 127:12 128:11 130:5 130:17,22 166:10 priority 108:13 privilege 162:14 probably 5:6 41:9 problem 39:3 52:17 95:16 132:6,13 159:14 problems 43:19,20 62:21 104:16 111:20 147:8 159:19 procedure 41:10,11 125:2 procedures 54:19 101:8,22 117:15 122:22 125:17 proceed 7:6 16:21 108:8 126:4 173:15 174:14 proceeded 78:3,21 proceeding 65:6 66:15 proceedings 11:8 18:5 66:14 process 20:1,8 22:14 23:4 25:17 36:12 46:19 53:14,15 58:7 67:20 68:8,10,13,18 69:20 72:6,16,20 74:8 76:3 84:3 87:8 92:18 92:20 98:18 100:13 100:15,18,19 101:12 101:14,20 102:21 108:11 111:7 114:12 114:13,15,19 115:2,7 117:14 119:10 123:6 125:4 129:13 135:16 135:18 140:3 154:15 processes 34:17 46:1 100:17 117:17 processing 45:22 51:8 91:9 94:7 109:8 produce 45:3 68:14 147:12 produced 1:22 26:14 31:17 produces 20:16 91:4 producing 72:11 135:22 product 15:14 19:4,9 19:12 29:9 41:6,14,18 46:4 160:19 171:15 production 32:20 47:11 68:13 72:15 76:9,12 77:11,14 114:12 123:6 products 3:10 12:20 19:3,18 32:14 135:12 135:21 PROF 149:4 professional 90:16 professionals 51:21 123:12 Professor 149:3 profound 132:16 progenitor 147:7 program 34:2,8 40:20 47:22 55:12,13 56:12 56:15 61:5 104:18 110:13,14,15 111:9 112:10 122:2,8,15 133:11 176:2 programmatic 132:19 programming 25:6 programs 56:19 57:15 118:3 139:6,8 169:21 progress 24:22 142:19 progression 31:6 project 99:19 100:4,9 102:4,7 projects 100:11 149:12 promise 14:1 promptly 35:4 promulgate 109:18 113:6 124:5 promulgated 113:11 prone 87:17 propagate 86:7 propagated 80:5 propagation 79:14,19 propelled 30:6 31:2 proper 23:11 42:22 143:9 properly 39:21 77:22 126:13,20 155:2 158:6 property 136:15 137:3 proposals 138:21 propose 67:22 151:19 175:9 proposed 18:10 66:19 108:13 123:3,14 124:3,14,21 125:11 145:2 148:14 164:17 proposes 120:9 proposing 120:1,14 protect 59:1 98:16 142:5,20 protected 56:12 protecting 54:16 98:13 162:5 protection 10:19 34:15 69:10 71:2 87:19 90:18 91:3 94:1,13 95:22 96:3 97:16,22 98:20 115:5 118:16 119:7 136:15 137:4 150:7,18 protocol 42:13,14 125:14 proud 14:3 provide 18:4 32:21 60:5 66:13 67:19 71:14,20 72:14 91:12 117:11 119:16 123:10 132:17 135:11 137:5 143:13 151:22 152:4 154:2 164:9 provided 1:22 3:2 70:12 75:21 87:7,10 103:17 104:6,13 114:17 provides 56:15 94:18 111:10 113:8 150:11 providing 90:18 137:2 provision 98:4 151:2 152:14 provisions 113:13 116:4 119:11 122:7 proximity 56:8 129:15 psi 86:3,4 PSM 46:12,18 159:17 161:4 public 1:5 2:8,17 3:4,19 4:11 9:6 11:16 12:2,4 17:15 18:8 48:3,3,6 48:22 49:11 51:20 59:21 60:6,11,12 65:5 66:17 112:4 115:3 133:13 136:12 145:1 165:18 168:19 177:11 publicly 11:21 published 135:22 142:21 Puerto 59:14 pull 89:8 103:4 127:1 pulled 85:4 88:18 89:4 103:7,10 pulse 74:4 82:13 pump-out 34:19 pumped 21:5 22:12,18 69:16 pumps 35:5 purchase 164:5 purpose 7:6 21:2 purposeful 163:22 purposes 97:21 149:10 163:15 push 49:13 55:3 pushing 49:8 146:15 put 38:19,22 148:17 152:12 154:20 163:5 173:1 Q qualifications 160:17 qualify 114:15 quality 135:11 quantity 42:10 56:4,9 quarrel 145:4 quarter 27:1 question 41:2,13 43:22 44:18 60:3,4,10 63:7 63:10 126:10 129:6 130:15 131:16 155:21 157:2 166:4,7,18 174:13,15 questions 2:7,16 3:17 4:9 15:9 18:7 35:12 35:15,19 39:13,15 43:4,12 48:1 59:18 66:17 126:5,8,10 128:7 140:7 152:17 153:10 157:20 162:21 165:17,22 168:8,22 170:10 quite 42:15 52:18 158:18 quote 10:12 quote/unquote 163:6 R R-1 121:20 R-2 122:4 R-3 124:5 R-4 123:16 R-6 124:15 R-8 125:12 Rachael 2:15 67:10 106:5

(202) 234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. 196 Rafael 1:11 2:2 4:16 rail 69:16 raise 61:2 raised 162:22 raising 164:22 ran 70:15 range 13:11 131:21 rapid 24:5 31:1 74:15 85:5,12 rapidly 19:11 24:1,7 25:12 31:12,15 rate 74:3 76:4 87:3 88:17 116:22 rates 90:5 rating 69:11 rationale 73:1 raw 69:2 76:2 re-instituted 60:9 reached 145:5 146:5 reactive 159:16 read 3:11 168:9,13 171:2,10 reader 154:5 readily 163:14 reading 46:15 165:4 readings 78:19 readopted 57:17 readoption 58:7 reads 123:5 124:5,15 124:22 real 50:11 reality 49:10 really 50:13 144:16 150:14 151:2 166:5 170:1,22 171:8 reason 132:16 170:12 170:21 reasonable 136:11 137:3 reasons 50:8 150:8 recall 40:21 155:5 157:8 receive 165:18 received 38:15 69:16 76:13 104:5 receiver 69:4 receiving 164:3 recently-confirmed 8:22 recess 65:1 recipient 45:14 recipients 177:7 recognize 5:16 12:21 43:5 65:7 recognized 137:2 148:20 recommend 94:9 recommendation 16:9 94:14 107:8 108:2 109:17,19,21 112:5 120:15,18 121:7,10 121:15,17,20 122:4 123:3,14 124:3,14,21 125:11 143:15 147:22 148:15 150:15,16 151:3,13 170:13 177:7 recommendations 5:14 6:16 8:19 44:21 45:4 45:14 50:14,16 51:14 54:22 62:22 66:20 67:16 68:1 75:5 90:19 119:19 120:2,5,8,19 121:5,19 132:5 138:15 139:20 140:1 142:12 149:17,19 158:10 161:2 164:4 164:13,17,17 168:11 168:17 170:1 171:9 172:1 174:2 175:8,9 175:11,14 176:4,8,16 recommended 16:6 40:8 90:9 92:3 95:5 96:15 107:4 108:7 recommending 54:18 recommends 91:11,19 97:4 reconsider 60:19 reconstituted 9:21 reconvene 4:3 64:21 65:5 record 63:7 65:3 102:12 103:16 130:10 162:17 162:19 177:15 recorder 144:3 149:5 recorders 84:1 recording 94:21 records 40:5,6,15 recount 126:18 recurrence 46:6 recycled 74:7,11 recycling 90:2 92:6 red 79:3 reduce 161:10 reduced 75:4 reduces 21:14 reducing 14:8 reduction 31:17 reenforce 104:19 118:3 Reepa 1:20 2:14 67:13 99:8 refer 119:1 reference 100:12 114:20 116:1 119:6 154:7 163:19 172:11 referenced 115:5 123:19 174:3,17 references 115:15 138:6 139:1 165:5 reflection 10:7 refresher 125:16 170:16,19 171:3 refreshers 176:15 refrigerant 22:15 24:7 25:11 31:14 34:21 58:6 refrigerated 1:3 2:4 3:15 7:10 11:17 16:22 17:6,10 18:18,19 20:4 26:4 32:19 44:11,16 45:10 51:9 refrigeration 7:17,18,20 18:2 19:19,22 20:1,8 20:11 21:3,4 23:3,7 23:12 24:19 25:9 32:12,22 33:14,16 34:1 35:7 38:19 42:17 43:14 45:6,22 47:2 50:19,21 58:4 62:3,4 64:2,9,14 regard 14:20 15:19 55:10 regarding 6:14 15:2,6 87:7 region 119:3 registered 167:13 Registry 28:5 58:18 regret 153:4 regularly 111:4 173:1 regulate 107:17,18 112:22 regulated 46:10 56:11 58:4 107:1 regulates 112:13 118:12 regulating 58:12 regulation 118:14 124:5 142:6,15 143:9 regulations 5:12 46:10 55:7,8 56:15 57:5,10 57:11,13,16 58:11 112:12,18 113:7 143:9 149:22 regulatory 44:22 53:7 53:17 56:16 106:6,9 143:20 reissuing 16:9 reiterate 120:2,14 175:6 reiterated 121:5,6,15 121:16 reiterating 121:10 175:15 reiteration 120:9 reject 100:11 rejected 58:8 related 5:10 37:19 87:22 111:16 120:19 142:12 relations 135:1 relationship 155:7 relative 37:17 relayed 71:5 103:15 release 6:14 7:9 14:22 15:15 17:9,12,14 24:11,14,16 25:16,19 25:22 26:9,14 27:5 28:12,18 29:2,8,11,15 29:16 32:4,6 35:2,3,9 37:4,13,20 38:11,13 39:6 41:19 42:1,2,4,5 42:10 43:1 44:13 51:18 56:13 57:4 62:3 72:8 75:6 released 20:14 26:8 27:22 29:3 32:10 51:18 74:17 138:17 144:15 releases 14:19 15:4 17:22 51:13 releasing 33:4 relevant 8:7 12:5 119:16 reliance 118:15 163:6 rely 112:12 148:3 remain 34:4 135:9 remaining 22:8 23:1 remains 108:13 137:15 remark 63:21 remarks 14:14 15:20,21 remember 47:10 133:2 remote 95:11 remove 23:1 34:20 73:18 removed 21:12 22:8,15 73:22 150:12 167:15 removes 58:3 reoccur 111:21 reoccurring 143:14 repeat 53:21 repeated 109:17 repeatedly 53:9 replacement 101:2 replicate 129:22 report 4:12 6:12,16 7:21 11:12 15:1 42:21 44:2 49:1 63:10 130:8 138:14 144:13,15 145:11 147:3 148:14 151:22 152:12 153:11 153:16 154:5,20 156:15 159:10 160:1 160:5 163:21 164:8

(202) 234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. 197 164:12 165:2,20 166:1,9 167:22 168:9 168:13,16,21 169:19 170:2 171:21 173:17 173:20 174:10,16 175:3,7 176:18 reported 24:17 26:15 27:8,14 28:7,22 39:6 44:10 53:3 79:11 81:16 143:3 reporter 49:21 reporting 16:8 reports 7:7 28:19 45:15 50:7,7,12 51:17 135:19 139:19 149:18 171:22 represent 5:18 141:2 141:20,21 170:3 representative 5:19,22 6:6 7:2 representatives 5:17 5:21 representing 48:11,15 162:14 reprocessing 74:13 reproduce 130:1 request 10:7 12:5 58:9 100:7 125:1 requested 10:4 51:4 requesting 10:12 requests 161:17 require 57:5 103:5 110:7 123:8 124:10 125:3 required 39:20 40:17 90:13 93:20 94:18 100:8 101:13 103:2,8 107:13,15 112:19 113:2,20 114:6 116:5 124:13 128:13 138:2 171:9 requirements 58:10 114:2 136:11,22 138:5,6,8,18 139:11 139:14 140:2 requires 64:10 115:19 124:6 requiring 113:18 163:17 research 135:19 reset 25:6,7 resident 151:6 160:6 residential 75:7 135:8 residents 44:4 residual 34:20 73:18 91:14 resilient 137:16 resinous 69:6 resolved 36:17 resources 56:18 respect 132:22 respective 21:7 82:15 respiratory 20:17 38:7 responded 27:19 29:1 38:10,13 105:8 155:19 responders 26:15 35:22 36:8,10 80:14 81:6 137:6 responding 35:2 36:7 41:22 81:16 response 6:4 7:4 9:13 13:14 15:4 28:2 35:20 36:15,19 43:1 52:12 53:16 61:15 63:4 71:7 78:8 80:21 99:21 103:2 104:3 112:6 118:2 120:20 121:12 126:22 160:19 173:13 174:11 177:4 responsibilities 158:4 responsibility 161:16 164:14 165:1 172:9 responsible 88:9 90:22 95:22 164:19 rest 55:5 141:14 restart 34:10 restarted 77:9 result 8:18 17:14 20:18 25:3 29:11 44:2 57:19 84:7 89:8 99:1 107:4 109:16 117:13,19 119:22 resulted 29:19 30:20 66:5 80:9 98:22 108:22 resulting 16:4 32:3 100:2 results 87:16 131:4 retained 165:8 retaining 102:1 retired 72:20 102:3,14 retirement 102:5 return 92:6,11,15 returning 92:17 reveal 93:3 revealed 86:16 96:19 97:8,12 101:19 103:22 117:21 reveals 30:12 review 114:22 115:1 125:5 135:15 144:16 144:17,18 159:22 160:19 166:10 reviewed 40:4 58:8 144:21 160:4 Revise 123:5 124:22 revised 110:5 revision 135:16 Richard 1:16,19 4:20 Richmond 60:13 Rick 9:10 43:6,11 Rico 59:14 rid 150:13 right 7:12 25:21 30:12 30:20 50:18 63:11 70:6 75:19 82:5,12,12 82:19 85:9,11 131:12 134:15 150:21 152:9 156:5 157:6,19 166:3 168:18 171:11 rise 79:3 84:14,18 85:6 87:4 riser 75:1 78:13 risk 10:13 46:20 55:6 56:6,22 57:2 93:16 97:14 110:18 132:18 143:16 risks 57:6,7 58:18 91:6 river 26:18 159:4 RMP 46:13,18 161:4 role 150:4,6 roll 71:12 174:18 roll-up 71:10 rolled 71:14 rolling 70:11 roof 17:13 25:14 26:3,9 26:16 29:3 30:3 31:21 32:3 38:2 40:3 42:5 73:10,16 81:21 88:21 90:2 98:13 129:17 167:1 roof-mounted 73:17 rooftop 28:17 room 8:17 11:3 39:5 66:8 68:16 69:18,19 70:3,7,8,9,16,20 71:2 71:10,11,15 72:9 74:13 76:7 77:5,15,17 77:20 78:1,4,10,16,18 80:2,6 81:4,12 83:3 103:14 104:22 127:7 127:21 155:11 157:6 root 50:8 54:13 111:18 111:19 169:22 rose 86:4 rotary 74:9 roughly 155:12 routine 125:19 Rubber 140:21 rubberized 78:11 86:11 96:19 rule 108:3,8,13,15,17 126:13 rulemaking 108:5,11 rules 57:18,21 161:3,6 run 76:22 running 9:9 35:8,10 runs 77:11 rupture 29:19 ruptured 17:12 Rutherford 4:7 7:13 8:14 10:7 66:2 68:5 68:10 79:21 81:10 103:16 105:5,6,7 106:11 124:16 141:10 151:4 155:5,18 173:22 S S-2511 58:1 Saddle 159:4 safe 49:11 55:4 84:3 135:9 137:15 safeguards 56:16 safely 15:11 safer 38:21 54:19 177:8 safety 1:1,10,12,13,13 1:22 2:5 3:5,15,22 5:12 7:8,15,18,22 10:18,21 13:13,15,16 14:20 15:14,17 16:6 16:10,22 32:10,14 33:4 45:3 46:19 47:17 48:5,21 49:6 50:15 51:4,11 52:21 53:14 53:15,21 54:10,12 59:20 60:5,6,15 61:18 61:22,22 64:12,17 99:13 101:16 105:7 105:10 107:5 112:10 112:22 113:14 115:3 117:13 120:3 121:2,5 121:14 125:6,17 134:21 135:4,7,13,19 136:11,14,20 137:3,6 137:10,12,17 138:2,6 139:2,14,18,21 140:1 140:4 142:10 148:3 148:19 152:22 160:7 160:8 162:3 164:20 165:10 173:19 175:9 175:11 sake 162:16 samples 86:15,19 87:13 Samuel 1:19 2:14 67:12 88:2 San 152:6 sanitary 115:2 satellite 19:6 Saturday 77:2 89:16

(202) 234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. 198 saving 14:9 saw 78:1 176:7 Scannell 160:6 scenario 150:10 scenarios 86:21 scene 81:7 scheduled 57:18 77:11 schematic 22:4 30:15 scheme 36:6 scientific 90:18 scope 164:1 166:6 scrap 109:8 screening 44:14 scrubber 72:4,8 101:2 101:5 scrubbing 72:6 se 165:17 second 7:11 8:11 11:18 41:1,19 62:8,11,15 64:22 85:8 86:12 87:6 87:11 123:14 124:21 146:12 166:11 174:5 174:6 second-guess 168:18 second-guessing 168:21 Secondly 60:3 section 55:13 80:21 88:3 94:12 99:7,12 106:9 122:9,17 151:20,21 172:5 sections 86:14,15 98:19 151:16 sector 15:16 sectors 141:3 see 3:9 12:16 13:6,21 70:5 73:5 75:14 81:11 85:9,12,20 86:4 87:12 89:5,18 91:17 92:8 128:4 153:16 165:4 172:20 seeing 66:10 seek 101:11 seeking 164:13 seen 14:17 170:16 self-heating 83:13 Senate 5:18 43:8 senator 5:21,21 6:6,10 6:13 7:2 10:1,2,4,15 10:17 send 127:2 senior 100:21 102:2,15 sense 40:15 128:22 132:18,20 sensing 147:14 sensors 25:21 37:10 81:17 separate 109:11 162:21 separated 81:19 September 108:5 sequence 34:8 85:1 154:22 155:6 series 106:14 116:15 serious 5:8 66:6 108:19 146:12 seriously 144:9 seriousness 112:3 served 19:14 service 11:17 40:9 70:11 71:10,13 76:7 140:22 services 1:3 2:4 3:15 7:10 16:22 17:6,10 18:18 26:4 27:19 45:10,22 62:4 135:12 164:5 session 36:2 set 25:20 27:20 33:17 34:12 37:4 69:8 setting 146:2 158:14 settled 88:19 seven 8:15 24:17 57:21 66:5 82:16 106:15 116:16 141:11 seven-hour 41:16 seventh 95:7 severe 87:1 99:5 109:21 severity 104:20 141:15 share 13:20 176:22 shared 143:11 shed 49:5 143:18 shelter-in 44:3 shelter-in-place 29:6 shift 68:6 76:9,12 77:10 Shin 2:10 59:7,8,9,10 61:1 ship 37:16,17,21 38:4 45:12 shipment 19:5 ships 19:4 25:18 27:13 28:18 shock 7:16 8:1 18:1 23:8,13 24:10 29:17 30:7 31:7 32:8,11 33:6 45:19 47:6 62:2 64:3,8,16 shocks 24:4 shook 78:7 82:14 short 4:3 22:19 59:20 89:18 96:17 short-sleeved 80:16 shortly 25:16 26:1 37:20 79:22 shortness 28:8 show 126:12 showed 96:7 showing 29:21 30:16 shown 93:3 shows 19:21 30:2 31:6 171:8 Shroff 1:20 2:14 67:13 99:8,10 106:8 163:2,5 164:6 shut 38:4 76:19,21 77:1 77:7 shutdown 15:12 35:4 41:4 42:14 shutting 35:8 41:21 42:8 SIC 171:14 side 23:21 26:17 27:3 30:22 sights 79:12 sign 11:21 61:13 169:6 signal 71:5 156:3 significance 159:20 significant 46:5 52:16 56:2 99:18 signs 40:11 66:10 81:14 similar 5:15 15:2,21 24:10 32:11 105:3 158:18 177:5 simple 19:21 170:7 simplified 70:2 simply 49:11 164:18 Simultaneous 61:11 single 33:17 113:12 sit 54:2 59:15 149:14 site 26:22 27:21 33:7 56:1 93:16 133:16 sites 15:10 situation 34:7 130:6 146:15 147:1 150:19 170:8 situations 13:17 152:10 six 59:13 86:15 Sixty-nine 151:7,7 sized 73:9,12 91:12 skilled 142:2 skin 80:9 slide 19:21 30:2 31:6 52:5 163:1,5 170:12 slight 85:10 sludge 90:6 sludge-like 83:14 86:18 93:4 small 56:1 151:4,8 smoldering 145:22 sodium 74:16,19 75:10 solicit 123:12 solid 68:13,20,22 76:5 90:10 solids 91:10 94:4,8 98:4 Solutions 16:1 109:8 121:16,17 132:8 something's 149:9 soon 109:20 sophisticated 161:15 sorry 9:16 61:9 168:7 sound 23:18 79:16 82:8 82:13 84:21 85:17 129:17 sounds 79:13 source 20:21 41:20 126:11 south 26:5,16 27:1 space 21:15 22:7 89:7 spaces 21:7 span 44:8 sparks 69:13 speak 3:21 36:5 41:2 144:7 149:7 169:7 speaking 61:11 149:13 149:15 speaks 168:9 special 69:11 151:16,21 specific 45:4 64:1 115:16 118:14 131:17 138:4 139:5 163:17 175:10 specifically 4:13 39:19 44:22 46:11 58:6 123:22 151:14 152:12 176:9,15 specification 76:2 specifications 39:20 94:22 95:2,4 101:6 131:8 specified 76:20 95:5 specifies 94:14 98:4 speed 77:21 79:15,16 spell 49:21 140:14 144:2 162:9 169:14 spent 152:6 spike 23:14 86:6 spill 26:21 spiral-wound 78:11 spoke 171:6 spontaneous 83:13 spontaneously 116:15 spread 50:22 sprinkler 71:1,3,4 81:4 97:16 103:13 sprinklers 81:12 97:5 97:18 98:7 square 86:2 97:9 98:7 SSI 147:13 148:5 stability 136:13 stacked 71:22

(202) 234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. 199 staff 1:15 4:21 5:4 11:14 50:4,12,17 51:4 120:9,13 134:22 149:7 152:16 159:13 165:16 169:9 staff's 125:21 staffing 52:8,17 staged 27:7 stages 72:5 staggering 132:9 stairway 70:13,14 stake 158:8 stakeholders 44:22 60:1 stand 168:13 172:17 standard 6:17 16:6,10 16:14 36:21 38:8 46:12,13 53:11 91:8 94:2,5,13 98:1,1 107:7,9,11,16,21 108:1,9 109:18,20 110:5 112:2,7,11 120:11,16,22 121:8 121:13 122:12 123:9 132:17 134:8 142:17 142:22 150:18,18 154:10 159:15,17 170:20 175:17 standards 5:12 38:7 49:6,7,9,10,14 52:11 53:6,12,19 91:5,7 94:2 107:2,11,14 114:20 115:5,6,16 116:1,8 118:17 119:7 119:15,16 123:18 125:9 128:11,18,22 129:3 134:2 135:11 139:2 153:19 154:10 158:9,14 160:22 161:1 172:8,11,13 standing 83:2 standpoint 148:19 164:16 stands 166:1 Stanley 65:8 start 18:12 61:20 66:12 68:9 76:18 116:13 126:6 start-up 104:9 117:6,18 started 4:16 96:21 154:14 starting 41:18 93:17 state 8:9,19 9:5 39:1 42:1 43:14 45:1 55:7 55:8 107:15 112:13 113:7 118:11 136:8 149:14 175:12 176:3 state-of-the-art 175:18 stated 10:11 78:11 108:12 113:13 126:21 statement 2:22 4:14 6:14 18:11 66:21 175:5 statements 2:2 3:13 12:22 states 10:16 14:6 18:20 59:12,12,13 64:15,15 90:10 112:12 115:11 136:2 137:14 141:2 static 126:13 stating 114:18 station 66:11 69:3,3 70:10 71:6,8,21 73:5 73:14 77:18 78:2,8,20 82:4,5 86:10 95:15 96:14 98:20 status 57:11 108:15 112:4 120:19 121:12 steam 23:17 steel 54:9,9 59:11,19 109:12 140:13,20 step 22:14 68:12 133:12 steps 107:22 108:10 139:4 stop 31:1 34:11 35:8 41:3 42:21 99:3 stopped 19:16 31:21 92:19 97:2 storage 19:8,10,17 21:6 32:20 45:11,13 47:4 138:8,13 store 19:8 44:15 45:12 stored 19:2 29:9 stores 19:17 strange 53:7 77:18 stream 75:19 strength 50:11 136:13 171:22 stress 40:12 157:13 strictly 116:19 165:10 stringent 55:7,7 striving 54:13 strong 12:9 32:1 176:22 strongly 142:11 143:17 150:14 structural 114:7 136:12 structure 115:12 structures 113:15 115:20 studies 45:16 131:18 study 2:12 4:13 7:11 8:12 45:19 47:15 62:20 64:22 106:22 132:4 173:17 174:3 sub 113:16 subject 69:12 142:15 159:11 subsequent 78:9 129:17 132:6 156:1 subsequently 160:8 substance 58:15 129:20 substances 28:4 55:19 56:1 58:4,17 suction 22:9 24:9 25:14 30:3,8,12,19,22 31:1 31:3 34:11 suctioned 73:15 sudden 23:13,15 suffer 141:12 suffered 8:16 17:15 158:21 suffering 66:6 153:5 sufficient 34:20 sugar 109:4 132:1,7 suggest 152:11 168:12 suggested 57:12 suggestion 172:15 suggests 96:15 summarize 17:20 summarizing 175:7 Sun 68:3 99:14 100:9 100:10 144:10 147:7 147:9 sunset 57:20 supervisor 1:17 78:22 127:18 supervisor's 78:5 supervisors 76:12 supervisory 18:14 67:8 supplier 40:6 support 58:20 59:1 62:15 63:13 142:11 142:14 supporter 10:18 supposedly 146:8 suppress 105:12 167:11 suppressant 167:20 suppressed 85:20 146:7 suppressing 168:3 suppression 74:15,18 74:20 75:9,11,15 76:1 76:15 79:6 82:10,11 84:19,21 85:6,16 86:5 87:9 96:22 97:19 98:14 99:2 145:10,16 146:3,17 147:14 155:9,15 156:1,21,22 157:16 163:13,21 166:17,21 167:5,8,10 167:13,16 sure 40:1 42:16 48:18 50:1 54:1 133:9 134:6 140:16 149:8 152:1 153:7 162:10 177:2 surface 21:20 22:21 30:11 surfaces 21:10,13,18 71:19 129:20 surrounded 26:11 surrounding 54:16 59:2 survey 28:5 Susan 67:14 susceptible 23:7 suspected 111:12 suspension 68:14 sustain 10:21 sustainability 135:5 sustainable 137:15 sustained 80:17 103:12 166:13 switch 35:5 sworn 60:17,20 symptoms 27:9,15 28:7 28:9,14,22 system 19:19 20:17 21:3 23:12,21 24:18 24:19 25:2,7,10 31:18 32:22 33:14 34:1,17 35:7 36:11 38:19,22 39:2,3,18 41:21 42:3 42:9 47:21 66:9 71:1 71:3,4 72:4,6,8,12,19 72:21 73:4,11,12,18 74:6,15,18,22 75:3,9 76:1,6,11,16,21 77:4 77:7,9 79:4 81:4 83:10,20 84:5,11,12 84:19 85:2 87:10,15 87:19 88:1,13,15 89:2 89:12 90:4,12 91:1,16 92:1,7 93:8,9,13,15 93:18,19,21,21 94:9 94:15,16,19 95:2,5,8 95:10,11,12,21 96:3,4 96:6,10,20 97:1,11,20 98:5,15,17 99:2,7,14 99:17,22 100:5 101:1 101:3,4,5,9 102:5,9 102:11,14,18,19,20 102:22 103:13 104:9 104:10,11,14,21 105:2 106:14 110:21 111:17 112:15,19 113:22 114:4,8,10 116:14,19 117:2,3,6 117:13,19 118:6,10 121:21 122:12 126:12 137:9,18 145:10,17

(202) 234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. 200 145:22 146:4,13,14 146:18 147:2,3,14 148:6,17 152:2,3 153:15 154:9,22 155:10,15 156:1,22 157:16 164:11,19 166:17,21 167:5,8,10 167:14 systems 5:13 7:17 15:3 21:4 23:7,17 24:5 33:16,20 34:2,14,19 62:3 94:2 97:5,6 98:2 98:8 125:9 147:11 148:2 150:5,5,12 158:5 160:13 176:10 T T 77:14 T-106 68:21 70:6 74:9 74:12 T-206 68:21 70:6 77:19 78:18 T-306 68:21 70:6 78:12 79:9 80:4 117:9 T-A-B-L-E 2:1 T-shirt 80:16 table 6:19 tables 11:22 take 11:2 13:19 18:3 63:11,21 66:12,22 142:10 148:10 taken 25:22 45:8 107:22 139:4 takes 15:16 45:5,7 talk 50:4 54:3 169:21 talked 52:6 talking 157:17 tank 73:14 74:12 76:18 77:16,20 78:14 81:15 82:18,19 83:6,7,16 86:11 89:6 105:4,10 156:9 166:12 tanks 68:21 69:1,17 70:3,5,14,21 73:8,20 77:8 83:19 84:2 86:9 89:10 95:15 96:11 98:19 117:5 tape 78:12 target 93:22 148:4 targets 110:14,16 TCPA 55:12,20 56:4,15 57:4,9,11,13,16,18,22 58:4,11 teaching 47:13 team 4:10,10 11:11 12:8,9 16:20 17:7 18:7,13 32:9 35:16 40:2 65:17,21 66:16 67:1,7,17 100:6,22 120:1 131:16 team's 18:6,10 66:15,19 teams 5:1 12:11 Teamsters 153:2 technical 15:5 21:1 32:15 113:8 125:19 140:7 151:10 technically 55:21 technique 21:16 techniques 135:20 technologies 38:21 159:1 technology 100:19 135:20 tell 39:17 170:7 telling 4:5 temperature 20:13 21:8 22:6,20 23:21 77:21 83:22 84:1 105:22,22 106:2 117:3 temperatures 69:13 84:4 temporarily 29:13 temporary 26:22 Tennessee 109:14 138:16 tents 27:3 tenure 132:15 term 108:10,16 termination 34:5 terminology 134:9 terms 44:10 52:5 53:5 150:6,8 166:1 173:3,8 terrible 159:18 test 40:6 94:22 95:1 tested 94:16 130:17,22 testified 156:11 testimonies 96:19 testimony 57:1,12 157:8 testing 86:20 93:16,21 94:10 130:16 tests 86:22 87:16 94:19 95:5 131:1 Texas 152:6 text 121:6 thank 6:9,11,20,22 7:1 12:7,14 13:3 14:9,10 14:13 16:14,15 17:2 22:2 33:11,12 35:13 39:11 43:2,3 44:17 46:7 47:9,21 48:8,21 49:16,17,19,21 50:2 54:4,6,11,15 59:2,3,5 60:21 61:1,5,16 63:20 65:11 81:1 88:4 99:9 99:10 106:7 119:20 126:3 128:4 131:12 131:15 133:7,18 134:4,4,16 139:18 140:4,8,9,10,17 143:20,21,22 144:3,6 148:22 149:2,7 152:15,18,19 157:21 162:5,7 168:20 169:1 169:2,3,4,17 173:12 173:14 176:20 177:9 thaw 41:18 thawing 41:9 Theodore 17:11 18:22 19:13,14 28:6 32:8 62:6 thick 79:9 thing 146:21 170:16 things 37:8 42:19 157:1 think 8:6 9:18 15:8 41:13,17,19 47:19 50:11,20 51:19 52:4,7 52:9,21 62:16,19 64:12,19 126:4 128:9 133:6,11,19 134:9 144:12,21 145:11,18 146:5,19,21 147:21 148:13 151:11,11,12 152:11 154:4 155:21 156:14 158:7 161:8 163:2,8 164:8 166:4,6 167:7 168:17 169:19 171:2,7,12 173:4 thinking 114:1 171:19 third 60:10 97:13 123:12 124:3 third-degree 80:17 Thirty-two 17:16 27:15 thorough 54:12 139:18 169:22 170:6 thoroughly 92:16 thoroughness 144:19 thought 47:1 101:7 thoughts 48:18 thousands 139:6 141:6 three 12:4 19:11 52:14 65:9 68:20 69:4 70:3 70:21 81:7 82:2 83:4 96:18 98:18 106:19 108:3 109:9,10 120:5 120:6,19 136:1 144:7 144:8 170:4 172:5 three-eighths-inch-th... 30:11 three-year 56:21 threshold 56:4,6,14 thresholds 55:16 56:9 thump 66:8 78:7,9 145:9,13 thumping 82:8 84:21 85:17 THURSDAY 1:7 time 3:2 4:5 5:16 12:1 16:10,17 18:17 21:9 22:19 25:1 26:2 30:16 40:10 44:7 51:16 52:1 52:3 60:22 71:12 78:6 82:8 89:19 115:4 120:21 121:3 128:7 144:17,20,22 145:1 145:17 153:20 154:3 154:8 155:19 157:9 159:5,7,7 169:2 time-initiated 34:18 timeline 107:22 times 34:19 55:18,20 147:2 timing 40:16 titled 173:20 today 3:9 4:18 6:13,21 9:6,12,12 11:12 12:6 32:10 140:18 141:22 143:11 153:13 160:12 161:13 177:6 today's 7:6 176:22 tonight 14:15 48:17 49:1 65:20 149:8,10 149:12,15,19 tons 33:19 tools 154:9 top 22:9 66:9 73:13 74:9 88:21 90:2 98:14 105:10 108:13 torso 80:11,18 total 26:7 44:6 147:6 175:9 touched 52:4 town 159:3 towns 151:8 toxic 27:7 28:4 55:11 56:13 58:2,17,21 track 108:18 tracks 43:22 trade 171:6,13 traffic 29:14 tragedies 54:20 55:1 120:12 121:9 143:6 tragedy 16:3 49:15 tragic 132:8 177:1 train 50:6 168:8 trained 34:16 38:11 52:9 142:3 training 32:21 37:15,19 38:7,14 76:14 99:21 104:1,4,6 119:13,16 123:16,22 125:7,16 127:4,12 139:6 151:4

(202) 234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. 201 169:20 170:18,19 171:3 176:12,13,14 transcriber 140:15 transcript 1:22 transfer 68:19 125:14 transferring 101:22 transfers 21:9 transition 23:10 transitional 102:13 transported 28:1 80:14 90:12 96:9 trapped 31:14 traveled 26:5,16,18 27:5 86:9 treated 27:22 29:3 triage 27:20 triennial 135:15 trigger 64:3 triggered 25:7,10 81:3 86:9 101:15 103:7,21 155:4 156:22 170:20 troubleshoot 104:15 troubleshooting 25:2 troubling 16:7 53:14 131:20 truly 9:18 43:10 try 41:20 132:15 156:20 171:11 trying 128:22 163:22 166:5 168:11 Ts 149:5 Tuesday 66:4 77:12,13 turn 72:1 80:20 81:5 99:6 106:4 116:9 119:18 126:1 turns 20:5 twice 56:9 two 3:10 4:22 7:7 11:6 11:13 12:6 14:16 16:1 16:18 25:17 29:19,21 39:15 49:5 50:7,14 57:19,22 68:21 74:21 75:12 82:16 87:13 92:13 93:6 120:5 128:18 144:5,8 149:5 149:5,18 177:5 two-part 126:10 twofold 58:13 Tyler 1:17 2:6 18:15 21:21 22:2 33:13 37:7 37:18 38:9 40:1,19 41:12 42:15 46:17 type 40:9,12 44:10 46:14 47:4,19 91:21 94:9 107:18 112:18 112:21 123:13 124:8 129:22 130:14 131:22 132:17 142:8 165:16 types 14:16 15:3 typical 45:14 typically 46:1 U U.S 1:1,10,12,12,13,22 3:4 5:17,18 8:8 10:21 107:5 136:2 175:11 UAS 148:5 UCC 113:4,7,9,11 114:11,21 115:5 116:3 119:9,15 123:10 UFCW 51:5 52:14 ultimately 5:13 32:3 42:12,12 97:17 164:5 167:3 unable 107:16 unacceptable 112:5 120:20 121:12 unaware 37:18 unburned 86:17 uncontrolled 83:18 89:7 uncorrected 111:20 undergo 135:15 understand 50:15 52:20 53:6 57:6 127:6 152:2,10 156:20 164:20 understanding 46:8 58:5 104:19 118:4 undetected 117:20 unfortunately 15:20 48:17 144:15 146:4 Uniform 113:3 119:4 123:7 176:4 Union 51:3 59:19 141:1 153:2 170:3 unionized 141:5 unions 50:6 153:3 169:21 unique 114:19 United 10:16 14:6 18:20 51:2 54:8,9 59:10,12 64:15 115:11 140:13 140:20 141:2 147:11 unknown 143:3 unreasonable 10:13 up-to-date 137:16 upper 80:11,18 upstream 35:11 urge 143:18 use 5:13 39:1 46:9 55:6 56:8 64:1 107:19 111:5 115:13 122:21 138:8 151:15 152:13 169:20 172:20 useful 47:2 135:10 154:5 user 94:17 users 113:15 uses 54:3 172:21 usually 96:18 USW 60:7 141:1,20 142:1 USW-represented 60:14 utilized 76:2 V vacuum 24:3 31:16 68:20 69:1 77:5 vacuuming 89:16,20 valuable 15:17 value 87:3,5,11,15 values 55:18,21 76:5 87:13 valve 22:9 24:6 25:10 30:18 31:1 33:21 34:12 valves 23:21 24:1 29:2 30:19 33:17 35:6 vapor 20:5,5 24:8 73:19 90:7 105:20 vapors 38:1 58:15 84:7 84:9 88:18 89:4,10 90:11 94:3 98:2 118:5 various 44:19 51:20 68:12 70:4 73:8,12 86:14 98:19 142:4 163:12 velocity 23:16 31:19 88:16 90:5,12 91:13 91:15,20 92:1,3 93:2 vendors 163:12,20 vent 75:2 ventilation 90:9 172:21 173:1 venting 79:10 97:16 verify 93:21 version 153:19 154:8 versus 56:20 vice 13:12 134:22 victims 17:17 132:10 141:14 164:22 video 33:5,6 view 70:2 73:3 75:18 78:15 Virginia 109:9 virtually 55:9 virtue 158:8 visible 20:16 26:2 81:14 visual 37:2,5 40:2,11,21 104:12 voice 132:15 void 22:13 Voids 31:14 volatile 86:12 132:21 148:9,12 volume 31:17 51:12 74:2 91:12 94:20 voluntarily 118:15 134:11 voluntary 107:2 153:18 158:11 volunteer 36:14 vote 2:11,21 3:22 4:12 18:9 61:18,20 63:8,13 63:16,18 66:19 144:13 145:6 146:19 173:16 174:19,21 175:1 voted 112:4,7 120:18 120:21 W W-2 165:7 walk 76:14 132:11 walk-through 104:11 want 14:15 39:8 42:19 49:11 62:16 144:18 148:22 153:3,11,14 156:10 157:21 158:17 162:16 wanted 48:18 112:9 121:2,14 154:21 156:19 161:19 wants 3:20 warehouse 18:19 26:1 29:11 warehouses 32:19 50:21 51:9 warehousing 44:11 warm 21:20 warn 69:11 95:15 washed 127:22 wasn't 52:19,20 132:12 150:20 155:11 157:15 170:7 water 23:17 26:21 27:6 27:20 29:14 81:20 115:1 way 16:11 49:15 73:9 95:17 100:15 104:22 115:1 149:17 164:3 164:13 ways 160:14,15 we'll 4:4 7:6 18:5 21:1 61:4 66:20 68:9 126:4 173:11 we're 14:15 30:16 60:14 150:22 151:8 153:13 154:1 158:15 161:13

(202) 234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. 202 161:20 165:15 we've 36:8 132:3 133:11 170:16 weaken 58:1,9 wearing 80:16,19 Web 33:6 60:6,8 61:3 week 60:11 weeks 60:16 weighing 15:13 welcome 3:4 6:9 65:11 131:14 weld 29:22 30:9 32:1 welfare 113:14 136:12 well-being 10:8 went 30:8 62:17 65:3 73:1,6 77:20 78:18 81:20 117:20 145:17 177:15 Wentworth 109:5 weren't 37:8 130:1 153:7 West 109:9 wet 72:3,7 101:2,5 wetting 69:7 white 20:16 26:5,10 160:1 162:13 whoosh 79:11 wide 45:21 131:21 widely 10:22 69:7 widespread 43:19 64:9 131:20 Williams 162:13 Win 152:20 153:1 wind 26:6 wish 144:11 wishes 11:20 witness 71:15 103:22 157:8 witnesses 79:9 women 141:7 143:7 wonder 43:15 wondered 130:16 wondering 129:8 word 171:4 words 6:7 work 6:11 10:18 12:10 12:15,17,19 14:1,7 16:12 49:13 50:3,4 51:10 55:2 59:15 67:4 73:6 81:18 82:15,19 82:22 83:6,9,16 86:8 86:14,15 88:8,10,19 89:5,22 91:2,11 93:2 93:5 95:19 96:13 97:6 98:6 104:15 105:10 116:13 117:8,20 129:18,21 137:8 139:22 141:3 142:18 145:20 146:1,16 147:5 152:16 166:16 167:9,21 168:4 173:5 173:9 worked 13:7 38:2 72:17 142:9 149:11 worker 13:16 51:2 90:17 workers 8:16 10:9 25:16 27:6,7,13 37:12 49:10 51:3 52:17 54:9 54:10,16 55:4 57:2 59:1,11,19 64:6 65:9 66:5 68:6 78:6,9 79:5 82:7,8,14,16 83:2 106:15,21 109:6,10 109:12 110:8 116:17 140:13,22 141:2,5,11 141:20,21 142:2,3,5 142:20 153:5 156:2 157:3,5 158:3 162:5 162:15 170:3,19 176:12 177:3 working 9:8,19 10:12 10:20 26:22 27:2 28:16 43:10 54:21 77:22 78:3 132:21 143:7 147:18 177:7,8 worried 161:7 worse 158:22 wouldn't 150:19 written 100:18 101:8 wrong 129:2 wrote 6:15 61:9 www.csb.gov 33:7 X Y year 106:20 139:7 153:14,17,20 154:13 154:20 years 12:17 13:10,14 14:17 40:10 49:5 52:14 57:19,21 72:7 108:4 132:3 133:3 136:1 152:6 158:20 160:10 161:14 York 59:13 Z zero 39:6 0 1 1 33:15 89:3 116:11 129:7 151:21 1,000 69:14 1,150 91:16 92:1 1:00 77:16 10 52:15 58:15 70:22 96:13 118:19 133:3 152:6 10-inch-diameter 74:8 10,000 56:10 10.3.1 94:12 101 47:15 103 151:21 106 2:15 73:8 11 44:8 119:4 110 22:18 31:9 111 44:11 112(r) 55:14 119 2:15 12 32:2 119:12 12-inch 30:3 125 2:16 13 2:3 130 23:5 134 2:17 138 92:9 14 2:3 106:21 109:6 166:14 140 2:18 143,000 19:20 144 2:18 149 2:19 15 1:7 14:17 44:10 65:1 85:14 15-minute 76:13 104:9 15-minutes 64:20 152 2:19 17:14 27:14 161 108:22 162 2:20 165 87:11,14 131:8 167 55:20 169 2:20 16th 9:18 57:17 17 2:5 70:7 173 2:21 175 2:22 18 55:18 184 92:11 19 44:12 1910.120 36:19 1910.38 36:20 1923 142:21 1975 113:12 1992 114:17 1993 68:5 1997 160:10 2 2 34:1 89:13 116:18 122:9 171:5 20 33:19 158:20 161:14 2003 106:19 132:4 2005 44:8 2006 16:5 91:11 94:8 107:4 108:2 109:21 120:14 121:10 132:5 154:7 2006-1-H-1 121:7 2008 105:6 108:21 109:3 2009 57:17 58:7 108:4,5 136:4 143:3 2010 17:11 18:17 19:1 24:14 32:6 62:6 94:4 98:4 108:9 109:7 115:8 2010-13-A-AL 62:1 2011 15:22 109:10 138:17 154:15 2012 6:12 8:15 10:2,5 49:2 66:5 68:17 72:3 76:8 77:2,10,12,13 88:15 89:17 96:1 108:11,21 109:15 138:19 141:9 154:15 174:1 2013 19:16 112:3 120:20 2013-01-I-NJ 173:20 2014 16:1 44:8 57:18 108:14 2015 1:7 2018 138:21 206 73:8 21st 158:20 22 2:6 23rd 17:11 62:6 24 19:9,12 68:6 240,000-square 19:7 25 13:14 92:2 25-horsepower 74:1 276 44:7 29 108:22 133:6 29th 105:6 3 3 34:13 52:6 60:10 90:3 117:3 3,300 74:3 3.8 86:2 3:00 76:10 30 50:20 70:7 85:18 300 91:4 306 73:8 77:15 81:15 82:18,19 83:6,7,16 86:11 166:12 32,000 32:4 32,100 26:7

(202) 234-4433 Washington DC www.nealrgross.com Neal R. Gross and Co., Inc. 203 322 92:12 325910 111:2 118:20 121:22 33 2:6 55:18 34 68:6 35 2:7 350,000 143:5 36 18:20 109:6 4 4 34:18 54:9 59:11,11 109:1 117:10 122:17 4,500 91:20 92:4 4.4 86:4 40 22:10 30:14 31:13 40-degree 31:11 45 13:10 48 2:8 5 5 35:2 55:20 70:22 117:17 5,200 56:5 5:23-2.14 123:8 50 2:9 13:10 108:20 109:1 133:3,6 500 44:4 54 2:9 570 69:14 59 2:10 5th 76:8 6 6 93:7 96:12 118:1 6.3 172:5 60 55:19 61 2:10 63 2:11 65 2:13 654 91:7 128:11,18 6th 77:2 89:17 7 7 2:2 118:8 75 97:9 98:6 8 8 95:20 96:13,13 118:11 8.10.3 94:18 8:45 24:21 800 27:2,12 81 2:13 850,000 141:2 88 2:14 8th 77:10 9

NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W. (202) 234-4433 WASHINGTON, D.C. 20005-3701 www.nealrgross.com

C E R T I F I C A T E

MATTER:

DATE:

I hereby certify that the attached transcription of pages to inclusive are to the best of my belief and ability a true, accurate, and complete record of the above referenced proceedings as contained on the provided audio recording.

204 Public Meeting in the Matter of: US INK/MILLARD REFRIGERATED SERVICES 01-15-15 1 204

FD06481 | 2015_美国_delaware-city-refining-company.pdf

分类:06_境外及港澳台调查报告 | 年份:2015 | 地域: | 严重程度: | 场所: | 起火原因: | 来源格式:pdf

CSB · Delaware City Refining Company Safety Bulletin 1

Published May 2017 Key Lessons for Preventing Incidents When Preparing Process Equipment for Maintenance Flash Fire at the Delaware City Refinery Delaware City, DE Incident Date: November 29, 2015 1 Employee Injured No. 2015-01-I-DE

KEY LESSONS • Operational tasks that involve preparing equipment for maintenance can be uncommon and non-routine; therefore, ensure procedures include steps for preparing all process equipment for maintenance. • For all equipment preparation activities, develop a process that requires pre-planning and hazard identification prior to initiating the work, which includes assessing hazards that may be introduced and steps for mitigating those hazards. • When isolating equipment for de-inventorying or decontaminating activities prior to maintenance work, avoid relying on single block valves, even when the valves are newly installed, to control the release of hazardous energy. • When an equipment preparation task or isolation plan needs to be modified or expanded due to leaking valves or changing conditions, initiate a process to evaluate hazards that may be introduced by the change. • Avoid draining materials containing, or potentially containing, hydrocarbon or flammables into the sewer or other systems not specifically designed for such services, especially when ignition sources are present.

CSB · Delaware City Refining Company Safety Bulletin 2 The U.S. Chemical Safety and Hazard Investigation Board (CSB) is an independent Federal agency whose mission is to drive chemical safety change through independent investigations to protect people and the environment. The CSB is a scientific investigative organization; it is not an enforcement or regulatory body. Established by the Clean Air Act Amendments of 1990, the CSB is responsible for determining the root and contributing causes of accidents, issuing safety recommendations, studying chemical safety issues, and evaluating the effectiveness of other government agencies involved in chemical safety. More information about the CSB is available at www.csb.gov. The CSB makes public its actions and decisions through investigative publications, all of which may include safety recommendations when appropriate. Examples of the types of publications include: CSB Investigation Reports: formal, detailed reports on significant chemical accidents that include key findings, root causes, and safety recommendations. CSB Investigation Digests: plain-language summaries of Investigation Reports. CSB Case Studies: shorter than a full investigative report, case studies present investigative information from specific accidents and discuss relevant prevention practices. CSB Safety Bulletins: short general-interest publications that provide new or timely information intended to facilitate the prevention of chemical accidents. CSB Hazard Investigations: broader studies of significant chemical hazards. Safety Videos: high-quality outreach products that result in improved worker and environmental protection. CSB publications can be downloaded at www.csb.gov or obtained by contacting: U.S. Chemical Safety and Hazard Investigation Board Office of Congressional, Public, and Board Affairs 1750 Pennsylvania Ave NW, Suite 910 Washington, DC 20006 (202) 261-7600 No part of the conclusions, findings, or recommendations of the CSB relating to any chemical accident may be admitted as evidence or used in any action or suit for damages. See 42 U.S.C. § 7412(r)(6)(G).

CSB · Delaware City Refining Company Safety Bulletin 3 INTRODUCTION On Sunday, November 29, 2015, an operator at the Delaware City Refining Company’s (DCRC) sulfuric acid alkylation unit suffered second-degree burns to the face and neck and third-degree burns to the wrist from a flash fire.1 The incident occurred when operations personnel were preparing equipment for maintenance work by de- inventorying and draining vessels located between two isolation points. A single block valve isolated the vessels being decontaminated from a pressurized and inventoried depropanizer column containing hydrocarbons; unknown to operations personnel, the valve leaked in the closed position, resulting in backflow of flammable material from the depropanizer. When an operator opened the vessel drain valve to empty what he assumed was condensate water from the vessel to the oil water sewer, the hydrocarbons from the depropanizer also released to the sewer and ignited, resulting in a flash fire. Prior to maintenance work, operations personnel commonly prepare equipment by depressurizing, de-inventorying, washing, and draining. These activities often involve opening process equipment and piping and can result in a release of hazardous energy. Though equipment preparation activities can occur rather frequently in process plants, the tasks involved may vary among pieces of equipment and piping and combinations of equipment and, thus, may be non- routine and not be included in an existing procedure. Because of the non-routine nature of equipment preparation activities, process plants should develop a system to ensure that equipment preparation activities are carefully planned, which includes selecting proper isolation methods and identifying hazards through a risk assessment. Of incidents the CSB has investigated, 37 percent occurred in chemical and manufacturing facilities prior to, during, or immediately following maintenance activities and resulted in 86 fatalities and 410 injuries. Some of these are current investigations in which the CSB is examining issues with non-routine operations and maintenance.2 This Safety Bulletin identifies the immediate causes of the flash fire at DCRC and summarizes key lessons to prevent similar incidents.

DESCRIPTION OF THE ALKYLATION UNIT PROCESS Alkylation is a refinery unit operation in which lighter hydrocarbons react with isobutane in the presence of an acid catalyst (sulfuric or hydrofluoric acid) to produce larger branch-chain hydrocarbon molecules with a high octane rating. The alkylation unit at DCRC receives butylenes from the fluid coker unit3 and the fluid catalytic cracker (FCC) unit.4 The alkylation unit contains two alkylation reactor sections, each comprised of two reactors that run in parallel.5 When operated at lower temperatures, the reaction produces a higher quality alkylate. Propane and excess isobutane cycle through the reactors to cool the reaction and are then condensed and sent back to the alkylation reactors. A small amount of the propane and excess isobutane recycle stream is purged to the depropanizer column. The depropanizer column maintains

1 This incident followed two others at the DCRC facility on August 21, 2015, and August 28, 2015. The CSB deployed a four- person investigative team to DCRC on December 3, 2015, to assess conditions at the refinery in the wake of the most recent incident. 2 See Appendix A for a list of CSB investigations involving maintenance. 3 In the fluid coker unit, the heaviest residual oils are heated and decompose into petroleum coke and lighter hydrocarbon products. 4 The FCC unit breaks down heavy oils into lighter gasoline components in the presence of heat and a catalyst. 5 The DCRC alkylation unit contains two separate sulfuric acid (H2SO4) process designs licensed by M.W. Kellogg Co. (acquired by Exxon) and STRATCO, Inc. (acquired by DuPont). 37% of incidents the CSB investigated occurred prior to, during, or immediately following maintenance work.

CSB · Delaware City Refining Company Safety Bulletin 4 optimal propane concentration in the unit by removing excess propane. Prior to entering the depropanizer column, the alkylation reactor purge streams travel through a caustic wash system to mitigate the risk of corrosion by removing trace amounts of sulfur dioxide. The November 2015 incident occurred in the caustic wash section of the alkylation unit. Caustic sodium hydroxide is used to scrub trace amounts of sulfur dioxide from the purge streams in a caustic settler (Figure 1). The solution is then fed to a coalescer or “carry over” vessel to ensure the caustic and water mixture is removed from the hydrocarbon stream prior to entering the depropanizer column. Caustic in the stream is removed in the caustic settler through the drain valve and recirculated into the process. Occasionally, spent caustic is extracted from the caustic settler and routed to a quench drum6 prior to venting to the refinery flare system.

PRE-INCIDENT ACTIVITIES On the day of the incident, alkylation unit operators were preparing equipment for turnover to the maintenance department, scheduled for the following day. The unit remained under the operations staff control throughout the equipment preparation activity, up to and including when the incident occurred. The maintenance activity involved replacing a 20-foot section of thinning piping located between the caustic settler drain line and the caustic recirculation pump (Figure 1) that was identified during a routine inspection process a month prior (Figure 2).

6 A quench drum cools and condenses hot vented gas streams before they enter a refinery vent header system. FIGURE 1. Simplified process flow diagram of depropanizer caustic wash system (Source: CSB).

CSB · Delaware City Refining Company Safety Bulletin 5

For the maintenance department to replace the piping, operators had to first drain and isolate it. Earlier in the week, operators planned to isolate the caustic settler from the pumps by closing the caustic drain valve (Figure 3), which is immediately downstream of the caustic settler and upstream of the line that needed replacement. Four days prior to the incident, however, operators learned that the caustic drain valve was leaking and therefore would not seal properly, which would result in material passing through the valve when in the closed position. Because the valve would not seal, operations could not isolate the section of piping that needed replacement and therefore had to expand the isolation to another block valve downstream of the coalescer and settler. As a result, the caustic settler and the coalescer needed to be included in the isolation. The equipment preparation activity for the expanded isolation was scheduled for Sunday, November 29, 2015. In the alkylation unit weekend instructions, the unit superintendent noted the leaking isolation valve and directed operators to take the caustic settler out of service on Sunday to isolate the piping that was scheduled for replacement on Monday, November

  1. In addition to the caustic settler, the expanded isolation plan required removing the contents of the coalescer

to ensure the line to be replaced was free of hydrocarbons (Figure 4). An operator looked for a procedure or job aid for the task of taking those vessels out of service; however, no job aid or procedure existed, so the dayshift operator and board operator developed informal instructions for isolating and de-inventorying that equipment. FIGURE 2. 20-foot replacement piping (Source: CSB).

CSB · Delaware City Refining Company Safety Bulletin 6

FIGURE 3. Original isolation plan shown in red (Source: CSB). FIGURE 4. Expanded isolation plan shown in red (Source: CSB).

CSB · Delaware City Refining Company Safety Bulletin 7 To begin the task, the dayshift operator first shut down the propane flow from the alkylation reactors by turning off the propane purge pumps that supply the caustic settler and double blocked the control valve stations on the pump discharge lines. The dayshift operator then filled the caustic settler with process condensate water7 to displace the contents of the settler and coalescer in the direction of the depropanizer column; this condensate water carried over into the downstream coalescer. Operators monitored the temperature of the piping downstream of the coalescer, as an increase in temperature would indicate that the process condensate fill had reached the preheater valve and displaced the contents of the settler and coalescer. The dayshift operator also connected a nitrogen hose to the caustic settler to aid in displacing the hydrocarbons and other contents of the vessels. Once the dayshift operator confirmed that the settler and coalescer were filled with process water and the contents of the vessels were displaced to the depropanizer column, the dayshift operator removed the depropanizer from service by closing the column’s inlet and outlet valves.8 As part of the modified isolation plan, the depropanizer column remained inventoried and pressurized. The closed coalescer outlet valve was intended to isolate both the coalescer and the caustic settler from the pressurized and inventoried depropanizer column throughout operation’s preparation for the maintenance task. After isolating the coalescer and caustic settler from the depropanizer column, the dayshift operator drained some of the condensate water that filled the coalescer and caustic settler to a quench drum to vent any remaining hydrocarbons to the refinery flare system. Then the dayshift operator drained the rest of the vessel contents to the oil water sewer (OWS) directly under the caustic settler 9 and began the second and final condensate water filling until shift change. INCIDENT DESCRIPTION Shortly after arriving for his shift on November 29, 2015, the nightshift operator spoke to the dayshift operator about the maintenance preparation task and reviewed the dayshift operator’s handwritten list of steps, while also identifying which equipment had been isolated. The nightshift operator, who was working alone on the equipment preparation assignment, proceeded with the next step in the process: draining the vessels from the second condensate wash. At about 6:00 pm the nightshift operator continued to de-inventory the vessels by opening the drain valve to the OWS to drain the carry-over condensate water into the OWS system. Shortly after opening the 3-inch drain valve to the OWS (Figure 3), he recalled hearing a pop and suddenly seeing a wall of fire advancing toward him; he suffered second-degree burns to the face and neck and third-degree burns to the wrist from the flash fire. He left the area and turned on stationary fire monitors. After turning on two of the monitors, a fellow operator advised him to seek medical attention due to the severity of his burns. The injured operator was transported by ambulance to the hospital and released December 3, 2015, three days after the incident. During the incident, fires were observed at multiple 4-inch OWS drains located at most of the pump stations between the OWS drain under the caustic settler and a furnace. The furnace was operating about 120 feet east of the caustic settler. Another operator was making rounds in the alkylation unit and responded to the fire along with

7 Condensate from the 40 pounds-per-square-inch (psi) steam system is used for flushing equipment and vessels in the units. The condensate typically is registered at about 200oF. 8 DCRC reported to CSB investigators that the depropanizer column was not critical to the alkylation process and could be shut down while the unit was in operation. 9 OWS is a pipeline that traverses from the alkylation unit to a monitoring box on the outer perimeter of the unit. The facility has two sewer systems: an OWS system and a storm water sewer. The OWS runs through a monitor box to the wastewater treatment plant.

CSB · Delaware City Refining Company Safety Bulletin 8 other operators stationed in the control room. The fire burned for approximately one hour before onsite refinery emergency response teams extinguished the fire by isolating the fuel source. An alkylation unit operator, who was also a fire brigade member, was called to assist. He recalled that the main source of flames came from the 3-inch drain pipe beneath the caustic settler near the drain to the OWS. He isolated the burning hydrocarbon streams by closing the drain valve to the OWS and extinguished a smaller fire at a half-inch drain pipe coming off the caustic settler by closing the associated valve (Figure 5). The operator/fire brigade member closed the depropanizer pre-heater valve upstream of the depropanizer column to cut off the supply of hydrocarbons that appeared to be coming from the depropanizer column.

INCIDENT ANALYSIS 5.1 ORIGIN OF THE FLASH FIRE The CSB concluded that hydrocarbons in the depropanizer column likely backflowed through the leaking 4- inch coalescer outlet valve into the coalescer and caustic settler during the maintenance preparation activity. A furnace, located about 120 feet east of the caustic settler, most likely ignited the hydrocarbons when the nightshift operator began draining the contents of the vessels into the OWS (Figure 6).10 When the alkylation

10 The investigation team concluded that the furnace, operating on an adjacent process unit downwind of the maintenance preparation activity, was the most likely source of ignition. The injured operator recalled the fire advancing toward him from the direction of the furnace. Isobutane vapors are known to travel to the source of ignition and flash back. The atmospheric conditions on the day of the incident would have allowed for the isobutane vapors to travel in the direction of the furnace. FIGURE 5.Drain pipes associated with the November 29 incident (Source: CSB).

CSB · Delaware City Refining Company Safety Bulletin 9 unit operators expanded the isolation to include the coalescer and caustic settler that morning, they closed only one valve between the depropanizer column and the equipment they were attempting to isolate. The four-inch coalescer outlet gate valve was later determined to have a slow leak through the valve seat,11 and likely allowed hydrocarbons in the depropanizer column to backflow into the caustic settler and coalescer during the equipment preparation activity. Post-incident analysis of the control system data verified depropanizer backflow and review of the process data revealed that the caustic settler level indicator recorded a slight increase in volume before the dayshift operator began filling the coalescer and caustic settler for the second condensate wash. The slight increase in volume indicated that the contents of the depropanizer were passing through the leaking valve. In addition, control system data show a drop in the depropanizer pressure and level indicators starting immediately before the second condensate fill, indicating that the column was depressurizing vapor back to the coalescer and settler. When the nightshift operator began draining the condensate water from the vessels, he expected the vessels’ contents to empty completely. Instead, hydrocarbon liquid and vapor backflowing from the depropanizer, and condensate water flowed into the OWS drain. The hydrocarbon vapor, made up of mostly highly flammable isobutane12 and propane, found an ignition source at the furnace (Figure 7) and the flash fire traveled back toward the nightshift operator’s location. Flames overcame the nightshift operator at the base of the coalescer and caustic settler. Six-inch collection drains at a number of pump stations (Figure 8) are located en route to the OWS collection drum and the pathway for the OWS is located in an orientation that brings it in close proximity to the operating furnace, with the closest drain about 25 feet from a furnace (Figure 9).

11 The valve seat is a stationary part of a valve. When the valve seat is in contact with the movable portion, it stops the flow 12 Isobutane is a highly flammable liquefied petroleum gas used in sulfuric acid alkylation. Vapor from isobutane can travel significant distances to ignition sources and flash back. Isobutane is also heavier than air (vapor density = 2) and can accumulate in drains and sewers where ignition can occur. Isobutane; MSDS. [Online]; ConocoPhillips: Houston, TX, April 2, 2012. http://www.conocophillips.com/sustainable- development/Documents/SMID213%20Isobutane.pdf, (accessed March 21, 2017).

CSB · Delaware City Refining Company Safety Bulletin 10

FIGURE 6. Diagram (not to scale) of depropanizer caustic wash system and associated equipment (Source: CSB).

CSB · Delaware City Refining Company Safety Bulletin 11

FIGURE 7.Burner on furnace (Source: CSB). FIGURE 8.Typical pump drain to OWS (Source: CSB). FIGURE 9. Proximity of furnace to OWS drain (Source: CSB).

CSB · Delaware City Refining Company Safety Bulletin 12 PREPARING EQUIPMENT FOR MAINTENANCE Typical day-to-day duties of refinery and chemical plant operators include controlling chemical process conditions and monitoring equipment to ensure it is working as designed and recognizing when adjustments or repairs are needed.13 When process equipment needs repair or replacement, operators are usually involved in initiating work orders for the maintenance department and preparing equipment so it is ready for maintenance work.14 Preparation can include depressurizing equipment, purging, draining or displacing tank contents, and isolating other process equipment or energized sources.15 Once operations personnel prepare equipment for maintenance, maintenance personnel take over to perform repair or replacement. 6.1 NON-ROUTINE WORK Maintenance, which can be non-routine, is a major source of incidents, due mostly to preparing the equipment for the maintenance, rather than the maintenance itself.16 Generally, preparing equipment for maintenance is a common task for operations personnel; however, the tasks involved can vary among different types of equipment and, in some cases, occur much less frequently than typical daily operational duties. Therefore, these tasks can be uncommon or non-routine and thus may not be included in existing procedures. In refineries, routine operations can include daily operator activities such as making slight adjustments to process equipment and retrieving product samples to ensure product quality. Non-routine operations entail work that may be done infrequently and, as such, warrant particular attention because they often involve more risk.17 Examples of non-routine work can include tasks related to planned and unplanned maintenance, turnarounds, and equipment modifications.18 Operators and refinery personnel at DCRC reported to CSB investigators that preparing equipment for maintenance is routine for operations personnel; however, the CSB concluded that the specific task of isolating and de-inventorying the coalescer and caustic settler was uncommon. An operator reported to CSB investigators that the original isolation plan was routine because the task is similar to the procedure for removing spent caustic

13 Center for Chemical Process Safety of the American Institute of Chemical Engineers. Guidelines for safe process operations and maintenance [Online]; New York, 1995; pp. 203-224. http://app.knovel.com/hotlink/pdf/id:kt003VFW31/guidelines-safe-process/maintenance (accessed March 22, 2017). 14 Center for Chemical Process Safety of the American Institute of Chemical Engineers. Guidelines for safe process operations and maintenance [Online]; New York, 1995; pp. 203-224. http://app.knovel.com/hotlink/pdf/id:kt003VFW31/guidelines-safe-process/maintenance (accessed March 22, 2017). 15 Sanders, R. E. Chemical process safety: learning from case histories, 4th ed. [Online]; Elsevier: New York, 2015; pp. 149-164. http://app.knovel.com/hotlink/pdf/id:kt010QITX1/chemical-process-safety/preparation-maintenance. (accessed March 23, 2017). 16 Sanders, R. E. Chemical process safety: learning from case histories, 4th ed. [Online]; Elsevier: New York, 2015; pp. 149-164. http://app.knovel.com/hotlink/pdf/id:kt010QITX1/chemical-process-safety/preparation-maintenance. (accessed March 23, 2017). 17 Center for Chemical Process Safety. Guidelines for Risk Based Process Safety - 10.2.2 Identify What Operating Procedures are Needed. Center for Chemical Process Safety/AIChE. [Online], 2007, http://app.knovel.com/hotlink/pdf/id:kt004MHNG1/guidelines-risk-based/identify-what-operating. 2007. 18 Lutchman, C.E.; Douglas, M.; Rohanie, S.R. Process Safety Management – Leveraging Networks and Communities of Practice for Continuous Improvement [Online]; Taylor & Francis: Boca Raton, FL, 2014; p. 19. http://app.knovel.com/hotlink/pdf/id:kt00TSLGX2/process-safety-management/process-sa-safety-management (accessed March 23, 2017). Preparing equipment for maintenance can involve uncommon or non-routine tasks such as draining, displacing, and/or isolating hazardous materials or energy sources.

CSB · Delaware City Refining Company Safety Bulletin 13 from the caustic settler. The expanded isolation plan, however, was non-routine, and the dayshift operator did not recall ever taking the coalescer and settler out of service prior to the day of the incident. After a review of applicable DCRC procedures and job aids for the work being performed on the day of the incident, the CSB concludes that the refinery lacked specific procedures for removing the caustic settler and coalescer from service. DCRC also lacked any general procedures to ensure that preparing equipment for maintenance, prior to lockout-tagout (LOTO), was done safely. 6.1.1 REMOVAL OF SPECIFIC EQUIPMENT FROM SERVICE Although DCRC has some procedures for taking specific equipment out of service, at the time of the incident no procedure for taking the coalescer and caustic settler out of service existed. There is a job aid that lists steps for removing spent caustic from the coalescer, but the task is limited to removing contents from that vessel into the quench drum only. The task performed on the day of the incident was much more complex and involved purging and displacing the contents of both vessels. Without specific procedures for taking equipment out of service, operators have no way to positively identify all associated valves to properly isolate equipment from the unit when performing non-routine or unfamiliar work. The absence of a step-by-step procedure or job aid may also create the opportunity for operator error as preparation activities may be inconsistent or misunderstood between shifts. 6.1.2 PREPARATION OF EQUIPMENT FOR MAINTENANCE At the time of the incident, DCRC also lacked general procedures for preparing equipment for maintenance and processes for identifying and addressing potential hazards associated with those tasks. While procedures for taking specific equipment out of service are needed, capturing every possible operational task or maintenance preparation activity can be difficult for refineries and chemical plants given the number of complex processes involved. Therefore, more general procedures should be applied in these situations to ensure that hazards are identified and addressed. Preparing equipment for maintenance, referred to as “safing equipment” at DCRC, involves non-routine tasks such as isolating energy, depressurizing, purging, and draining, as well as other activities. If these activities are not done safely, they can increase the possibility of exposure to flammable or toxic materials, hazardous energy sources, steam, or asphyxiant gases. Had the incident not occurred, the nightshift operator would have completed the safing activity as planned and then placed tags and locks on valves in accordance with the DCRC energy isolation (LOTO) procedure. DCRC’s energy isolation procedure states that operators must complete an equipment isolation log to identify which equipment will be worked on, isolate equipment energy sources, and prepare equipment to ensure a state of “zero energy.” Thorough isolation is accomplished by de-pressuring, draining, steaming, washing, de- energizing, and evacuating the equipment. After which operations affix an isolation lock and a “do not operate” tag on each energy isolation device, such as block valves, and create a record in the energy isolation log in the control room. Once the isolation is verified, operations personnel turn the equipment over to the maintenance department to perform maintenance work. Though the energy isolation procedure includes steps for performing safing activities on equipment and ensuring “zero energy,” the procedure is not referred to until equipment preparation activities are completed and LOTO activities are initiated. As a result, at the time of the incident, DCRC had no formalized process, general procedure, or job aid for ensuring equipment was properly isolated, de-inventoried, or decontaminated prior to maintenance work.

CSB · Delaware City Refining Company Safety Bulletin 14 6.2 ISOLATING EQUIPMENT Maintenance preparation activities, such as draining equipment, often involve isolating the equipment being taken out of service from energized and inventoried equipment and piping. Pipes and vessels can be isolated from a process by closing valves, blocking and bleeding the valve system, inserting a blind (or blank), and physically disconnecting the energy source.19 Closing valves is the least effective because valves can leak, allowing for the passage of hazardous energy sources. In a double block and bleed, a bleed line is located between two closed block valves that vents any material that passes through the first closed valve. A more protective isolation measure is the insertion of a blind or solid metal plate that blocks flow in the line. The most protective measure is to disconnect the hazardous energy source. DCRC relied on an isolation method that used a single closed isolation valve, which was later determined to have a slow leak, to act as a barrier between the hydrocarbons in the depropanizer and the vessels they were draining. DCRC reported that the valve was only three months old at the time of the incident. Even though the valve was relatively new, the single closed isolation valve method did not adequately isolate the depropanizer column from the coalescer and caustic settler to prevent hydrocarbons in the column from backflowing into the vessels and providing a flammable atmosphere when the nightshift operator began draining the vessels into the OWS system. DCRC tested five block valves associated with the isolated equipment post-incident, and all were found to leak when in closed positions. Three drain valves downstream of the caustic settler had both slow and heavy leakage. Also tested was the 4-inch drain valve directly downstream of the caustic settler that was intended to be closed during the original isolation phase, but would not hold. The leak test concluded that the valve seat on the caustic settler drain valve was broken or missing and that the new 4-inch coalescer outlet valve had a slow leak through both seats under 120 psi air pressure. When isolation was expanded to include the coalescer and the depropanizer, DCRC relied on the outlet valve of the coalescer to prevent hydrocarbon backflow from the depropanizer. An adjacent coalescer outlet valve that remained open during the maintenance preparation activity was also tested post-incident and was found to have a heavy leak. Proper equipment isolation and decontamination begin with effective preplanning and hazard identification, and companies must ensure that equipment is free from hazardous energy during maintenance preparation activities. 20 This de-energized state can be achieved by selecting proper isolation points and verifying that the system is free from hazardous materials or energy sources that can injure workers. Though it may be common to close valves when isolating equipment prior to de-inventorying vessels and piping, companies should avoid using a single block valve and consider more protective methods of isolation when preparing equipment for maintenance.

19 Mannan, S. Lees’ Loss Prevention in the Process Industries, 4th Ed. [Online]; Elsevier: New York, 2012; Vol. 2, pp.1840-1843. http://app.knovel.com/hotlink/pdf/id:kt00BFG451/lees-loss-prevention/equipment-maintenance (accessed March 23, 2017). 20 Wallace, S.; Merritt, C. Know When to Say ‘When:’ A Review of Safety Incidents Involving Maintenance Issues. Process Saf. Prog. 2003, 212-19. Avoid using single block valves to isolate hazardous energy sources. Valves can still leak, even when newly installed.

CSB · Delaware City Refining Company Safety Bulletin 15 Prior to the incident, DCRC had no procedure or process to ensure that isolation points were holding prior to starting equipment preparation activities. Nor was there a process or procedure to require the use of more protective forms of isolation for equipment preparation activities when possible. When isolating the depropanizer, the operator closed a single block valve between the depropanizer and to the coalescer. Because this valve had a slow leak when closed, hydrocarbons from the depropanizer backflowed into the vessels during equipment preparation and fueled the flash fire. The CSB identified three other valves between the coalescer and the depropanizer that remained open for the maintenance preparation activity in addition to the closed and leaking coalescer outlet valve (Figure 3).21 A closed isolation valve should be used only to isolate low-hazard fluids, not lines containing pressurized hydrocarbons.22 In addition, a line containing isobutanes within close proximity to a furnace warrants a more secure method of isolation. 6.2.1 EXPANSION OF THE ISOLATION PLAN When alkylation unit operators and the unit superintendent learned that the valve immediately downstream of the caustic settler leaked, they decided to expand the isolation to include additional equipment. Because DCRC lacked a general procedure or job aid for preparing equipment for maintenance and for taking those specific pieces of equipment out of service, the alkylation unit operations personnel, relying on their knowledge and expertise of the equipment and process, developed an informal plan. The expanded isolation plan was much more complex than the original, as it involved isolating more equipment and de-inventorying vessels (Figure 4). A complex isolation can be defined as any situation in which equipment requires special control methods due to the nature of the hazards and variables influencing effective isolation.23 When the need for a more complex isolation is recognized, particular attention should be paid as to how the situation differs from the traditional or conventional method, in addition to hazards that may be introduced.

21 A coalescer outlet valve and two depropanizer pre-heater valves remained open during the isolation. The coalescer outlet valve directly downstream of the coalescer was found to have heavy leakage. The two depropanizer preheater valves were not tested after the incident, so it is unknown if closing the preheater valves in the isolation plan would have blocked the flow of hydrocarbons from the depropanizer. 22 Mannan, S. Lees’ Loss Prevention in the Process Industries, 4th Ed. [Online]; Elsevier: New York, 2012; Vol. 2, pp.1840-1843. http://app.knovel.com/hotlink/pdf/id:kt00BFG451/lees-loss-prevention/equipment-maintenance (accessed March 23, 2017).

23 Grund, E. V. Lockout Tagout: The process of controlling hazardous energy: The National Safety Council: Chicago, Illinois. 1995. Proper equipment isolation and decontamination begins with effective preplanning and hazard identification.

CSB · Delaware City Refining Company Safety Bulletin 16 6.3 DCRC EQUIPMENT PREPARATION GUIDELINES The CSB found that the November 2015 incident at DCRC could have been prevented by applying more protective energy isolation techniques and identifying potential hazards introduced by expanding the isolation scheme. This could have been accomplished through preplanning that identified hazards prior to equipment preparation activities or a Management of Change (MOC) review to address risks imposed by changes to work methods. Since the incident, DCRC has developed and implemented a standing instruction for operations personnel when preparing process equipment for maintenance. The instruction provides a structured approach to identify hazards through a risk assessment and steps to mitigate hazards that may be introduced during equipment preparation and decontamination. For all equipment preparation activities that are non-routine, an equipment preparation plan must be developed to document all aspects of de-inventorying and decontamination prior to maintenance work.24 The plan requires operations to conduct a simple, qualitative risk assessment that includes identifying hazards and developing mitigation steps to reduce hazards and listing the steps for preparing the equipment. The plan also requires management and other departments to review and authorize the plan depending on the complexity of the proposed work. For all routine and non-routine equipment preparation activities that involve opening process equipment, the new standing instruction also requires operations personnel to follow general guidelines for all types of equipment. These general guidelines require consideration for isolating energy for decontamination activities, draining equipment to closed systems, and referencing existing safety procedures that also apply during these activities. 6.4 MANAGEMENT OF CHANGE (MOC) MOC is a process for evaluating and controlling hazards that may be introduced during modifications to facility equipment, operation, personnel, or activities; MOCs can also be used to identify, evaluate, and control unintended hazards introduced by modifying procedures or when developing a new plan or procedure. The MOC process, intended to occur prior to the change, requires evaluations and approvals, and safeguards the facility and workers by preventing unintended consequences. MOC is a required element for all OSHA Process Safety Management-(PSM) covered facilities.25 An MOC process is used for changes to facility design, equipment, processes, plans, procedures, maintenance tasks, and the organization. Typically, once the need for a change is identified, an MOC proposal is developed to describe the details of the change and its impact on health and safety. Qualified facility personnel evaluate the MOC and assess the hazards via a systematic hazard assessment methodology (e.g., hazard and operability study26) prior to approval. Once approved, the process requires communication and training to ensure all changes are well understood. DCRC has an MOC procedure that covers all temporary and permanent alterations to process equipment,

24 A DCRC equipment preparation plan must be developed for “non-standard” jobs: those that do not have specific procedures, preparation activities involving multiple units, or jobs that can result in potential exposure to certain listed hazards, among other criteria. 25 OSHA. Process Safety Management of Highly Hazardous Chemicals. 29 CFR 1910.119(l). https://www.osha.gov/pls/oshaweb/owadisp.show_document?p_table=STANDARDS&p_id=9760 (November 3, 2016). 26 A hazard and operability study (HAZOP) is a method of identifying hazards through a systematic and structured examination of operations and processes. When modifying or expanding an isolation plan, establish a process to identify new hazards that may be introduced to the process and ensure secure isolation.

CSB · Delaware City Refining Company Safety Bulletin 17 procedures, or information. DCRC performed an MOC for the planned piping replacement scheduled for the day after the incident because the replacement piping segment material was different from that of the previous pipe. DCRC’s MOC process also addresses procedural changes when there are “revisions to steps, additions to warnings or notes, new procedures, or when removing invalid/obsolete procedures.” DCRC’s MOC reviews are subject to process hazard analysis (PHA) requirements, depending on the complexity of the change. This can range from an evaluation question review for minor and well-understood changes to a full PHA for complex changes. DCRC stated that an MOC did not apply to the maintenance preparation activity or the expansion of the isolation scheme because there was no standing procedure, job aid, or instruction from which to deviate. In response to the November 2015 incident, DCRC established a process that requires a risk assessment prior to selecting isolation points and de-inventorying and de-energizing equipment. An MOC review should also be considered to manage hazards during non-routine equipment preparation activities, particularly in the absence of an existing procedure or when a change to the planned isolation arrangement is necessary. The risk of an incident increases significantly when changes to hazardous processes are not reviewed.27 The effective use of an MOC program for identifying and mitigating risks associated with a change is limited to the ability to recognize which changes should initiate the MOC. In the absence of a robust MOC program, operating decisions are based solely on experience without the benefit of a hazard analysis.28 Though DCRC created a handwritten list of steps for performing the maintenance preparation activity and did not deviate from an existing procedure when expanding the isolation, the CSB concludes that the new plan should have been considered a change. Changes that appear to be minor can introduce hazards;29 therefore, MOC systems should include non-traditional changes that do not fit into common MOC categories. Anything that “feels” like a change should initiate an MOC,30 including additions or deletions to a process or its supporting systems.31 Had an MOC review been initiated, a hazard evaluation could have identified the potential for backflow and recognized the need for a more protective method of isolation between the coalescer and the depropanizer column.

27 Center for Chemical Process Safety of the American Institute of Chemical Engineers. Maintenance. Recognizing Catastrophic Incident Warning Signs in the Process Industries [Online]; John Wiley & Sons: Hoboken, NJ, 2012; p.

  1. http://app.knovel.com/hotlink/pdf/id:kt00AOZ6A1/recognizing-catastrophic/failure-recognize-operational

(accessed March 22, 2017). 28 Ibid. 29 Mannan, S. Lees’ Loss Prevention in the Process Industries, 4th Ed. [Online]; Elsevier,:New York, 2012; Vol. 2, pp.1834-1888. http://app.knovel.com/hotlink/pdf/id:kt00BFG451/lees-loss-prevention/equipment-maintenance (accessed March 23, 2017). 30 Center for Chemical Process Safety of the American Institute of Chemical Engineers. Maintenance. Guidelines for safe process operations and maintenance; New York, 2008. 31 Ibid. MOC systems should include non-traditional changes that do not fit into common MOC categories.

CSB · Delaware City Refining Company Safety Bulletin 18 KEY LESSONS

  1. Operational tasks that involve preparing equipment for maintenance can be uncommon and non-

routine. Ensure standard operating procedures include steps for preparing all process equipment for maintenance, either in procedures for specific pieces of equipment or general procedures for equipment preparation that cover all types of equipment. These procedures should cover tasks such as de-inventorying, decontaminating, washing, steaming, purging, and draining equipment and vessels.

For all equipment preparation activities, develop a process that requires pre-planning and hazard identification prior to initiating the work. This should include the proper selection of isolation points and an assessment of hazards that may be introduced during the equipment preparation activity and steps for mitigating those hazards.

When isolating equipment for de-inventorying or decontaminating activities prior to maintenance work, avoid reliance on single block valves, even when the valves are newly installed, to control the release of hazardous energy such as toxic, flammable or pressurized materials. Valves may fail, leak or be inadvertently closed or open. Always consider more protective measures for isolation, including double blocks, the insertion of blinds, or the complete disconnection of hazardous energy sources.

When an equipment preparation task or isolation plan needs to be modified or expanded due to leaking valves or changing conditions, initiate a process to evaluate hazards that may be introduced by the change. This process can include a risk assessment initiated by an MOC or another work process to ensure effective isolation and removal of hazardous energy sources.

Use closed systems such as tanks, drums, flares, or scrubbers to control the dissipation, draining, or relieving of hazardous energy in preparation to isolate equipment for maintenance. Avoid draining materials containing or potentially containing volatile hydrocarbons or flammable materials into oily water sewer systems not designed for such services, especially when ignition sources are present. CONCLUSION Maintenance preparation activities can be non-routine and, as such, warrant additional consideration to ensure hazards are properly identified and addressed, particularly when the maintenance preparation activity lacks procedures or requires modifications due to changing conditions. Based on the immediate causes of the DCRC incident, this Safety Bulletin highlights issues that can arise when equipment is not securely isolated and emphasizes the need for general and equipment-specific procedures when taking equipment out of service. It also calls for careful evaluation when isolation plans need to be expanded or modified. Non-routine operations and maintenance can account for a significant number of incidents in the process industries. As a result, key lessons from this DCRC Safety Bulletin can be used to remind operations personnel, maintenance staff, and plant management to have maintenance preparation procedures and processes that ensure hazards are evaluated prior to non-routine maintenance preparation activities. This is especially important if refineries and chemical plants have increased cross-functional work between operations and maintenance, in which operations personnel engage in more non-routine preparation work prior to handing equipment over to the maintenance department.

CSB · Delaware City Refining Company Safety Bulletin 19 APPENDIX A: CSB INCIDENT INVESTIGATIONS INVOLVING MAINTENANCE AND NON-ROUTINE OPERATIONS Preparing equipment for maintenance is a major cause of serious incidents in plants of all types.32 In the chemical industry, 30 percent of incidents are maintenance-related, with half involving the release of a harmful substance.33 A more recent study of incidents in the refining industry concludes that 50 percent of process safety incidents occur during transient or non-routine operations or planned operations that infrequently occur.34 CSB has investigated or is currently investigating several incidents that occurred prior to or during a maintenance or non-routine work activity. Of the 96 completed CSB investigations35 and 7 incidents currently under investigation, 39 (37 percent) occurred prior to, during, or immediately following maintenance work. These maintenance-related incidents resulted in a total of 86 fatalities and 410 injuries to employees and members of the public.

Incident/Date Maintenance Activity Maintenance Phase Consequences 1 Union Carbide, March 1998 Workers were performing a black light inspection and cleaning of flanges on a 48-inch pipe with a temporary enclosure while part of the piping was being purged with nitrogen. Shutdown 1 fatality 1 injury 2 Tosco Avon Refinery, February 1999 Workers cut into a line after several unsuccessful attempts to isolate naphtha due to a leaking valve. The naphtha ignited and exploded. Online maintenance36 4 fatalities 1 injury 3 Bethlehem Steel Corp., February 2001 Accumulated coke oven gas condensate in an unused section of pipe ignited when workers were attempting to remove a slip-blind for replacement. Shutdown 2 fatalities 4 injuries 4 BP Amoco Polymers, March 2001 An unbolted cover blew off a vessel, expelling hot plastic and ignited when workers were troubleshooting issues after an aborted startup. Shutdown 3 fatalities 5 Motiva Enterprises LLC, July 2001 Contractors were performing hot-work to repair grating on a sulfuric acid tank catwalk when sparks ignited flammable vapor in a storage tank. Online maintenance 1 fatality 8 injuries 6 First Chemical Corp., October 2002 A runaway reaction in a distillation column resulted in an explosion upon start-up after maintenance work. Startup 3 injuries

32 Grossel, S. S.; Crowl, D.A. Handbook of Highly Toxic Materials Handling and Management, Marcel Dekker: New York, 1995. 33 Grossel, S. S.; Crowl, D.A. Handbook of Highly Toxic Materials Handling and Management, Marcel Dekker: New York, 1995. 34 Ostrowski, S.W.; Keim, K. K. Tame Your Transient Operations: Use a special method to identify and address potential hazards. [Online]. July 23, 2010 http://www.chemicalprocessing.com/articles/2010/123/. 35 Includes CSB investigations that resulted in products such as safety bulletins, case studies investigation reports, and hazard investigation studies. See http://www.csb.gov/investigations/ for a complete listing of investigations. 36 The term “online maintenance” refers to maintenance activities performed on equipment containing hazardous energy sources (e.g., an empty tank interconnected to other tanks containing flammable vapors) or maintenance work on equipment isolated from operating processing equipment.

CSB · Delaware City Refining Company Safety Bulletin 20 7 Hayes Lemmerz International, Inc., October 2003 A combustible metal dust explosion occurred after the shutdown of a system due to a smoldering fire near the furnace. Shortly after restarting the system, maintenance workers were troubleshooting issues when a fireball erupted. Startup 1 fatality 6 injuries 8 Huntsman Petrochemical Corp., January 2004 Thermally reactive material remained in a low section of piping after operators purged the line with nitrogen. During a high-pressure steam purge, the material violently decomposed and ruptured the pipe. Preparing equipment 2 injuries 9 Giant Industries, April 2004 Maintenance workers began working on a pump that they believed had been previously isolated from the process when high pressure alkylate released from the pump case flange and ignited. Online maintenance 6 injuries 10 Sterigenics, August 2004 After running a series of tests to troubleshoot the sterilization chamber, mechanics and operators abbreviated a calibration cycle to get the system started up. Ethylene Oxide leaked from the chamber and ignited. Startup 4 injuries 11 Valero Delaware City, November 2005 A contractor attempted to retrieve a roll of tape from a tank under a nitrogen purge and became unconscious. Another employee also became unconscious while trying to assist the worker. Both workers died of nitrogen asphyxiation. Shutdown 2 fatalities 12 Bethune Point, November 2006 Mechanics were welding on a methanol storage tank when vapor ignited. Online maintenance 2 fatalities 1 injury 13 BP America, March 2005 The incident occurred during the startup of an isomerization unit when a raffinate splitter tower was overfilled and contents ignited. Startup 15 fatalities 180 injuries

14 Partridge-Raleigh, June 2006 Contractors were welding on production tanks when flammable vapor inside one of the tanks ignited. Shutdown 3 fatalities 1 injury 15 Xcel Energy, October 2007 Workers were in a confined space flushing an epoxy sprayer with MEK when flammable vapor ignited. Shutdown 5 fatalities 3 injuries 16 Packaging Corporation of America Tomahawk, July 2008 Workers were welding on a temporary metal clamp to stabilize a damaged flange connection. The flange was located on top of an 80-foot tall storage tank that contained recycled water and fiber waste. The welding ignited tank vapor. Online maintenance 3 fatalities 17 Bayer CropScience, August 2008 Operators were restarting a pesticide production unit when a vessel exploded. Startup 2 fatalities 8 injuries 18 Goodyear, June 2008 A heat exchanger ruptured after an isolation valve was left closed during a prior maintenance activity. Online maintenance 1 fatality 6 injuries 19 MAR Oil, October 2008 Contractors were welding on a series of interconnected crude oil storage tanks when flammable vapor ignited. Online maintenance 2 fatalities

CSB · Delaware City Refining Company Safety Bulletin 21 20 EMC Used Oil Corp. December, 2008 A contractor was welding transfer piping on a two-compartment oil tanker when residual hydrocarbon vapor ignited. Online maintenance 1 fatality 1 injury 21 ConAgra Boardman, February 2009 A welder was performing hot work inside a tank containing waste water from a potato washing process. The liquid contained organic matter that likely produced flammable gas ignited by the welding activity. Online maintenance 1 fatality 22 A.V. Thomas Produce, March 2009 Employees were using a torch to refurbish an old fuel tank when residual hydrocarbon inside the tank exploded. Online maintenance 2 injuries 23 TEPPCO Partners, LP, May 2009 Contractors were performing hot work on top of an internal floating roof storage tank when flammable vapor in the tank exploded. Online maintenance 3 fatalities 24 ConAgra Garner, June 2009 A worker was attempting to purge a new gas line by venting natural gas indoors when an explosion occurred. Online maintenance 3 fatalities 67 injuries 25 Kleen Energy, Feb 2010 Workers were conducting a “gas blow” to force natural gas through power plant fuel gas piping to remove debris prior to start up. The natural gas was released to the atmosphere and ignited. Startup 6 fatalities 50 injuries 26 Tesoro Anacortes, April 2010 Workers were in the final stages of start-up after maintenance on heat exchangers when another in-service heat exchanger catastrophically ruptured. Startup 7 fatalities

27 DuPont Yerkes, November 2010 A contract welder and foreman were repairing the agitator support atop an atmospheric storage tank containing flammable vinyl fluoride. Online maintenance 1 fatality 1 injury 28 Hoeganaes, January 2011 A maintenance mechanic and electrician were troubleshooting a suspected off-track bucket elevator. Upon restart of the elevator, vibrations from the equipment dispersed iron dust into the air and shortly after, the dust ignited. Startup 2 fatalities 29 Hoeganaes, March 2011 When replacing igniters on a band furnace, an engineer lofted large amounts of iron dust when using a hammer. The iron dust ignited resulting in a flash fire. Online maintenance 1 injury 30 Hoeganaes, May 2011 After shutting the plant down because of a previous incident that led to two fatalities, the plant was in start-up mode, when a hydrogen flash/metal dust fire occurred. Startup 3 fatalities 3 injuries 31 Chevron, August 2012 Workers were trying to determine how to best fix a leaking pipe when the piping system broke loose and light gas oil ignited. Online maintenance 26 injuries37 32 Williams Olefins, June 2013 Incident occurred during troubleshooting of poor performance of unit. An operator went out without developing a plan or procedure and Online maintenance 2 fatalities

37 Six Chevron employees suffered minor injuries as a result of the incident. 15,000 area residents sought medical attention following the incident and 20 were admitted for inpatient treatment.

CSB · Delaware City Refining Company Safety Bulletin 22 began to turn valves. He inadvertently added heat to a blocked-in heat exchanger causing an explosion. 33 Tesoro Martinez, February 2014 Incident occurred when operators opened a block valve to return an acid sampling system back to service. Very shortly after this block valve had been fully opened, the tubing directly downstream of the valve came apart, spraying two operators with acid. Startup 2 injuries 34 DuPont La Porte, November 2014* Incident occurred after a series of events during troubleshooting a clogged feed line. During troubleshooting, valves were opened and toxic gas entered the process building, killing four workers. Online maintenance 4 fatalities 35 Exxon Mobil Torrance, February 2015+ Incident occurred during troubleshooting to bring a piece of equipment back in service. This was a normal activity and had happened many times before. Online maintenance 2 injuries 36 Delaware City Refining Co, November 2015 When preparing equipment for maintenance operators were in the process of emptying process vessels when hydrocarbon backflowed from a downstream depropanizer through a leaking block valve. Preparing equipment 1 injury 37 Sunoco Logistics, August 2016* Contractors were performing hot work on a pipeline when flammable crude oil vapor in that section of the piping ignited. Online maintenance 7 injuries 38 Exxon Mobil Baton Rouge, November 2016* Flammable vapor were released during unplanned maintenance on a pump. Although there was no explosion, the release ignited and caused a large fire. Online maintenance 6 injuries 39 Packaging Corporation of America DeRidder February 2017* Contractors were performing welding near a tank that contained flammable material. The welding ignited vapor inside the tank. Shutdown 3 fatalities 7 injuries *Ongoing CSB investigations †In September 2015, PBF Energy, which owns and operates DCRC, announced the acquisition of the Exxon Mobil Torrance, CA, Refinery.

CSB · Delaware City Refining Company Safety Bulletin 23 Members of the U.S. Chemical Safety and Hazard Investigation Board:

Vanessa Allen Sutherland, J.D. Chairperson

Manuel Ehrlich Member

Richard Engler Member

Kristen Kulinowski, Ph.D. Member

FD06482 | 2015_美国_exxonmobil-torrance-refinery-explosion.pdf

分类:06_境外及港澳台调查报告 | 年份:2015 | 地域: | 严重程度: | 场所: | 起火原因: | 来源格式:pdf

Published May 2017 CSB · ExxonMobil Torrance Refinery Investigation Report Investigation Report Investigation Report

ExxonMobil Torrance Refinery Electrostatic Precipitator Explosion Torrance, California

Incident Date: February 18, 2015 On-Site Property Damage, Catalyst Particles Released to Community, Near Miss in MHF Alkylation Unit

No. 2015-02-I-CA

KEY ISSUES:

• Lack of Safe Operating Limits and Operating Procedure • Safeguard Effectiveness • Operating Equipment Beyond Safe Operating Life • Re-use of Previous Procedure Variance Without Sufficient Hazard Analysis

2 CSB · ExxonMobil Torrance Refinery Investigation Report The U.S. Chemical Safety and Hazard Investigation Board (CSB) is an independent Federal agency whose mission is to drive chemical safety change through independent investigations to protect people and the environment. The CSB is a scientific investigative organization; it is not an enforcement or regulatory body. Established by the Clean Air Act Amendments of 1990, the CSB is responsible for determining accident causes, issuing safety recommendations, studying chemical safety issues, and evaluating the effectiveness of other government agencies involved in chemical safety. More information about the CSB is available at www.csb.gov. The CSB makes public its actions and decisions through investigative publications, all of which may include safety recommendations when appropriate. Examples of the types of publications include: CSB Investigation Reports: formal, detailed reports on significant chemical accidents and include key findings, root causes, and safety recommendations. CSB Investigation Digests: plain-language summaries of Investigation Reports. CSB Case Studies: examines fewer issues than a full investigative report, case studies present investigative information from specific accidents and include a discussion of relevant prevention practices. CSB Safety Bulletins: short, general-interest publications that provide new or timely information intended to facilitate the prevention of chemical accidents. CSB Hazard Investigations: broader studies of significant chemical hazards. Safety Videos: high-quality outreach products that result in improved worker and environmental protection. CSB publications can be downloaded at www.csb.gov or obtained by contacting: U.S. Chemical Safety and Hazard Investigation Board Office of Congressional, Public, and Board Affairs 1750 Pennsylvania Ave NW, Suite 910 Washington, DC 20006 (202) 261-7600 No part of the conclusions, findings, or recommendations of the CSB relating to any chemical accident may be admitted as evidence or used in any action or suit for damages. See 42 U.S.C. § 7412(r)(6)(G).

CSB · ExxonMobil Torrance Refinery Investigation Report 3 TABLE OF CONTENTS 1.0 Executive Summary ............................................................................................................................ 6 2.0 Refinery Background .......................................................................................................................... 8

ExxonMobil Corporation ................................................................................................................ 8

Torrance Refinery ........................................................................................................................... 8

PBF’s Acquisition of the Torrance Refinery .................................................................................. 9 3.0 Process Description ........................................................................................................................... 10

Catalyst Loop ................................................................................................................................ 11

Main Column ................................................................................................................................ 12

Regenerator Combustion Gas ....................................................................................................... 13

Hydrocarbon Leak to Air Side ...................................................................................................... 14 4.0 Incident Description .......................................................................................................................... 15

Pre-Incident ................................................................................................................................... 16 4.1.1 Initial Expander Problems ..................................................................................................... 16 4.1.2 Monday, February 16, 2015 .................................................................................................. 16 4.1.3 Tuesday, February 17, 2015 .................................................................................................. 19

Incident ......................................................................................................................................... 19 4.2.1 Wednesday, February 18, 2015 ............................................................................................. 19

Incident Consequences .................................................................................................................. 23 4.3.1 Catalyst Dust Reaching Community ..................................................................................... 24 5.0 Causal Analysis of February 18 Explosion ....................................................................................... 25

Lack of Safe Park Procedure and Verifiable Operating Parameters ............................................. 27

Reliance on 2012 Variance ........................................................................................................... 29 5.2.1 Development of 2012 Variance ............................................................................................ 29 5.2.2 Use of 2012 Variance in 2015 ............................................................................................... 31

Spent Catalyst Slide Valve Failure ............................................................................................... 32 5.3.1 SCSV Testing Strategy Ineffective ....................................................................................... 33 5.3.2 Extended Operation of SCSV ............................................................................................... 34 5.3.3 Damage Mechanism Hazard Review Ineffective .................................................................. 35 5.3.4 Work Progressed on Day of Incident When It Was Known SCSV Was Leaking ................ 35 5.3.5 Opportunity for Safer Design ................................................................................................ 36

4 CSB · ExxonMobil Torrance Refinery Investigation Report

Steam Barrier Failure .................................................................................................................... 37

Heat Exchanger Tube Leak ........................................................................................................... 39

FCC Unit Remained in Safe Park and Was Not Shut Down ........................................................ 41

ExxonMobil Opened Process Equipment Not in Conformance with Refinery Standards ............ 42

ESP Remained Energized When Hydrocarbons Entered Flue Gas System .................................. 44 5.8.1 Hydrocarbons in Flue Gas Piping Did Not Trigger ESP Shutdown ..................................... 45 5.8.2 Previous ESP Hydrocarbon Explosions ................................................................................ 47 5.8.3 Opportunities for Safer Design ............................................................................................. 47 6.0 Causal Analysis of Modified HF Alkylation Unit Near Miss ........................................................... 49

ESP Siting ..................................................................................................................................... 50 6.1.1 Preventing Consequences of an ESP Explosion ................................................................... 50 7.0 Additional Torrance Refinery Incidents............................................................................................ 52 8.0 California PSM Reform .................................................................................................................... 53

Damage Mechanism Review ........................................................................................................ 53

Employee Participation ................................................................................................................. 53

Safeguard Protection Analysis ...................................................................................................... 54

Conclusions ................................................................................................................................... 54 9.0 Key Lessons ...................................................................................................................................... 55 10.0 Conclusions ....................................................................................................................................... 56 11.0 Recommendations ............................................................................................................................. 57

ExxonMobil Corporation .............................................................................................................. 57

Torrance Refining Company ......................................................................................................... 59

American Fuel and Petrochemical Manufacturers ........................................................................ 60 Appendix A: Comparison Between 2012 and 2015 Safe Park DCS Data…………………………………...…….65 Appendix B: ExxonMobil 2015 Variance……………………………………………………………………………..….70 Appendix C: Acci-Map………………………………………………………………………………………………..………72

CSB · ExxonMobil Torrance Refinery Investigation Report 5 ACRONYMS AND ABBREVIATIONS

Acci-Map bpd Accident Map Barrels Per Day CSB CO U.S. Chemical Safety and Hazard Investigation Board Carbon Monoxide ESP Electrostatic Precipitator FCC H2S HF Fluid Catalytic Cracking Hydrogen Sulfide Hydrofluoric Acid MHF Modified Hydrofluoric Acid MOC OSHA Management of Change Occupational Safety and Health Administration PHA Process Hazard Analysis ppm PSM Parts Per Million Process Safety Management RCSV Regenerated Catalyst Slide Valve SCAQMD SCSV South Coast Air Quality Management District Spent Catalyst Slide Valve

6 CSB · ExxonMobil Torrance Refinery Investigation Report 1.0 EXECUTIVE SUMMARY On Wednesday, February 18, 2015, an explosion occurred in the ExxonMobil Torrance, California refinery’s Electrostatic Precipitator (ESP), a pollution control device in the fluid catalytic cracking (FCC) unit that removes catalyst particles using charged plates that produce sparks—potential ignition sources—during normal operation. The incident occurred when ExxonMobil was attempting to isolate equipment for maintenance while the unit was in an idled mode of operation; preparations for the maintenance activity caused a pressure deviation that allowed hydrocarbons to backflow through the process and ignite in the ESP. The CSB found that this incident occurred due to weaknesses in the ExxonMobil Torrance refinery’s process safety management system. These weaknesses led to operation of the FCC unit without pre-established safe operating limits and criteria for unit shutdown, reliance on safeguards that could not be verified, the degradation of a safety-critical safeguard, and the re-use of a previous procedure deviation without a sufficient hazard analysis that confirmed that the assumed process conditions were still valid. This report discusses the key factors that caused this incident, which include:

  1. ExxonMobil did not establish the safe operating limits for operating the FCC unit in Safe Park—a

standby mode of operation—or determine process conditions that required unit shutdown. As a result, the FCC unit was unknowingly placed in an unsafe condition when a critical safeguard—pressure induced by steam flow—was reduced below a safe level;

  1. ExxonMobil re-used a procedure developed for a similar maintenance operation in 2012 that allowed

deviation from typical refinery safety requirements. ExxonMobil did not, however, perform a sufficient hazard analysis to determine if the unit conditions specified in the 2012 procedure were valid for the 2015 operation. The safeguards specified in the 2012 procedure were not sufficient for the 2015 operation, and they failed to prevent hydrocarbons from backflowing through the process and into the ESP;

  1. ExxonMobil operated FCC unit equipment beyond its predicted safe operating life.1 The failure of the

equipment allowed hydrocarbons to reach the ESP;

  1. ExxonMobil lacked safety instrumentation to detect flammable hydrocarbons flowing through the

equipment and into the ESP. The inability to detect hydrocarbons flowing to the ESP appears to be an industry-wide problem; and

  1. ExxonMobil refinery management permitted opening process equipment without conforming to

refinery standards. As a result of this incident, a near miss event occurred in the modified hydrofluoric acid (MHF) alkylation unit when explosion debris nearly hit tanks in close proximity to the ESP, each containing hydrofluoric acid (HF), water, hydrocarbons, and a chemical additive intended to reduce the amount of HF vaporized during a loss of containment event.2 HF is a highly toxic chemical that can seriously injure or cause death at a concentration of 30

1 ExxonMobil does not define a piece of equipment’s safe operating life, but the company’s equipment strategy documentation does set forth inspection and maintenance intervals. 2 The CSB was not provided with documentation quantifying the resulting effect of the chemical additive on a potential HF release, and as such the CSB cannot comment on the effectiveness of this additive.

CSB · ExxonMobil Torrance Refinery Investigation Report 7 parts per million (ppm).3 ExxonMobil resisted CSB requests for safety information pertaining to the potential release of HF in the event the tanks were struck by explosion debris. ExxonMobil continues to refuse to provide the CSB with information detailing safeguards to prevent or mitigate a release of HF. The CSB has issued subpoenas for this information, and is pursuing enforcement in US Federal district court.4 As a result of the investigation findings of the February 18, 2015 incident, the CSB issues recommendations to ExxonMobil, Torrance Refining Company (the current operator of the refinery), and American Fuel and Petrochemical Manufacturers (AFPM). These recommendations aim to:

• Ensure all ExxonMobil and Torrance refinery safety-critical equipment can effectively perform its safety-critical function;

• Ensure ExxonMobil procedure deviations are analyzed for safety by a diverse, experienced team prior to their approval and implementation;

• Ensure ExxonMobil and Torrance refinery ESPs are assessed for potential siting risks and are designed with safeguards to prevent major consequences of an ESP explosion; and

• Ensure the lessons from this incident are learned broadly throughout the refining industry.

3 The National Institute for Occupational Safety and Health (NIOSH), "NIOSH Pocket Guide to Chemical Hazards, Hydrogen fluoride," 11 April 2016. [Online]. Available: https://www.cdc.gov/niosh/npg/npgd0334.html. [Accessed 27 February 2017]. 4 ExxonMobil has not provided this information to the CSB because they have stated that the requested documents are not within the CSB’s jurisdiction in investigating the causes of the February 18, 2015 incident.

8 CSB · ExxonMobil Torrance Refinery Investigation Report 2.0 REFINERY BACKGROUND EXXONMOBIL CORPORATION The Exxon Mobil Corporation (ExxonMobil) was formed on November 30, 1999 as a merger between Mobil Oil Corporation and Exxon.5 ExxonMobil operates five refineries within the United States with a total combined capacity of approximately 1,857,500 barrels per day (bpd).6 ExxonMobil also explores for oil and gas deposits; drills wells; transports crude oil; and sells finished petrochemical products, including gasoline. In addition to a substantial research division, ExxonMobil has a chemicals division that produces a wide range of products, including synthetic rubber, plasticizers, synthetic automotive oil base stocks, and catalysts.7 In 2016, ExxonMobil reported $226 billion in revenue, with a net earnings of $7.8 billion.8 TORRANCE REFINERY The General Petroleum Corporation, which would eventually become part of Mobil Oil,9 announced the construction of the Torrance refinery on October 4, 1928.10 The company chose this site due to its proximity to the Los Angeles Harbor, and because the City of Torrance was designed as a mixed use, industrial/residential area.11 The Torrance refinery was ExxonMobil’s second smallest refinery nationwide,12 and currently sells about 5 million gallons of low emissions gasoline per day in Southern California, Arizona, and Nevada. The Torrance refinery currently produces approximately twenty percent of the gasoline sold in southern California and ten percent state- wide. The refinery also produces jet fuel, diesel fuel, liquefied petroleum gases (LPG), coke, and sulfur. The refinery covers 750 acres and employs approximately 650 employees and 550 contractors. The Torrance refinery is surrounded by the City of Torrance, which as of July 2015, had a population of 148,000.13 Figure 1 shows the Torrance refinery, outlined in yellow.

5 ExxonMobil, 2017. Our history. [Online] Available at: http://corporate.exxonmobil.com/en/company/about-us/history/overview [Accessed 07 March 2017]. 6 U.S. Energy Information Administration, 2016. Refinery Capacity Report. [Online] Available at: https://www.eia.gov/petroleum/refinerycapacity/refcap16.pdf [Accessed 07 March 2017]. 7 ExxonMobil, "Our Products," 2017. [Online]. Available: http://www.exxonmobilchemical.com/Chem-English/about/our- products.aspx. [Accessed 07 March 2017]. 8 ExxonMobil, "ExxonMobil Earns $7.8 Billion in 2016; $1.7 Billion During Fourth Quarter," 31 January 2017. [Online]. Available: http://news.exxonmobil.com/press-release/exxonmobil-earns-78-billion-2016-17-billion-during-fourth-quarter. [Accessed 07 March 2017]. 9 Gnerre, Sam. South Bay Daily Breeze, "Capt. John Barneson brings an oil refinery to Torrance," 4 October 2014. [Online]. Available: http://blogs.dailybreeze.com/history/2014/10/04/capt-john-barneson-brings-an-oil-refinery-to-torrance/. [Accessed 07 March 2017]. 10 Torrance Herald, "3 Million Dollar Refinery to Go Up Here Immediately," 4 October 1928. [Online]. Available: http://arch.torranceca.gov/archivednewspapers/Herald/1928%20May%203%20-%201929%20Oct%2031/PDF/00000239.pdf. [Accessed 07 March 2017]. 11 M. Crawford, Building the Workingman's Paradise - The Design of American Company Towns, London: Verso, 1995. 12 The Torrance refinery was sold by ExxonMobil to PBF. 13 United States Census Bureau, "QuickFacts, Torrance City, California," 01 July 2016. [Online]. Available: https://www.census.gov/quickfacts/table/PST045215/0680000. [Accessed 07 March 2017].

CSB · ExxonMobil Torrance Refinery Investigation Report 9

PBF’S ACQUISITION OF THE TORRANCE REFINERY On September 30, 2015 ExxonMobil announced an agreement to sell the Torrance refinery to PBF Holding Company LLC (PBF).14 Founded on March 1, 2008, PBF owns five refineries in the United States with a combined capacity of 884,000 bpd.15 PBF completed its acquisition of the Torrance refinery from ExxonMobil on July 1, 2016, and Torrance Refining Company LLC (TORC), a fully-owned subsidiary of PBF, currently operates the refinery.16,17

14 ExxonMobil, "ExxonMobil to Sell Torrance Refinery to PBF Energy," 30 September 2015. [Online]. Available: http://news.exxonmobil.com/press-release/exxonmobil-sell-torrance-refinery-pbf-energy. [Accessed 07 March 2017]. 15 PBF Energy, "Refineries," 2017. [Online]. Available: http://www.pbfenergy.com/refineries. [Accessed 07 March 2017]. 16 PBF Energy, "PBF Energy Completes Acquisition of the Torrance Refinery and Related Logistics Assets," 01 July 2016. [Online]. Available: http://investors.pbfenergy.com/news/2016/07-01-2016-113123883. [Accessed 07 March 2017]. 17 The PBF Torrance refinery is now operated under new leadership. Many employees who worked at the refinery while it was owned by ExxonMobil still work at the refinery. FIGURE 1 Google Earth image of Torrance refinery and surrounding community

10 CSB · ExxonMobil Torrance Refinery Investigation Report 3.0 PROCESS DESCRIPTION The February 18, 2015 explosion at the Torrance refinery occurred in the refinery’s fluid catalytic cracking (FCC) unit (Figure 2). The FCC unit “cracks” heavy, high boiling point hydrocarbon molecules into smaller molecules with lower boiling points. The main product produced by the FCC unit is gasoline. A large portion of the FCC unit was involved in the sequence of events leading to the explosion in the unit’s electrostatic precipitator (ESP), which removes catalyst particles from the regenerator combustion gas to meet environmental regulations before it is discharged into the atmosphere. This section of this report describes the FCC unit at the Torrance refinery.

FIGURE 2 Schematic of ExxonMobil Torrance Refinery FCC unit

CSB · ExxonMobil Torrance Refinery Investigation Report 11 CATALYST LOOP During normal operation, a catalyst18 in the form of small spherical particles19 circulates between the reactor and the regenerator in the direction of the circular arrow in Figure 3. The catalyst is typically fluidized, meaning that the solid catalyst is aerated with hydrocarbon vapor, steam, or air so that it behaves like a liquid (Figure 420). The catalyst both drives the cracking reaction and transfers heat from the regenerator to the heavy hydrocarbon feed entering the reactor riser.

18 A catalyst is a substance that increases the rate of a chemical reaction without changing its own composition. 19 The catalyst used in the FCC unit is a powdery solid composed mainly of clay and aluminum oxide. 20 Photos in Figure 4 are still video clips from Glatt, "HP Spray Coating," 2017. [Online]. Available: http://www.glatt.com/en/processes/coating/fluidized-bed-coating/hp-spray/#jfmulticontent_c6020-1. [Accessed 07 March 2017]. FIGURE 4 Depiction of stationary particles (left) and fluidized particles (right) FIGURE 3 Catalyst loop in ExxonMobil FCC unit

12 CSB · ExxonMobil Torrance Refinery Investigation Report The cracking reaction occurs in the reactor riser (Figure 3). Heavy hydrocarbons are fed into the reactor riser, where they vaporize upon contact with fluidized hot catalyst, and the cracking reaction begins. The cracking reaction continues as the mixture of hydrocarbon vapor and catalyst travel up the riser. Coke, a solid byproduct of the cracking reaction, deposits onto the catalyst particles during the reaction process, making the catalyst less effective. The coke-covered catalyst is referred to as “spent catalyst.” The spent catalyst and cracked hydrocarbon vapor exit the riser and enter the reactor vessel, where most of the catalyst particles are separated from the hydrocarbon vapor. The cracked hydrocarbon vapor then flows to the main column for separation (Section 3.2). The spent catalyst is routed to the reactor standpipe. Within the reactor standpipe is the spent catalyst slide valve (SCSV), which controls the spent catalyst flow into the regenerator. Inside the regenerator, the hot spent catalyst contacts air supplied by the main air blower. The coke deposits that are on the surface of the hot catalyst particles burn off when in contact with the air, in a combustion reaction. The heat of combustion further heats the catalyst particles, and this “regenerated catalyst” enters the regenerator standpipe. The regenerated catalyst slide valve (RCSV) controls the flow of the hot catalyst to the reactor riser where it contacts, heats, and vaporizes fresh heavy hydrocarbon feed to begin the cracking reaction.

MAIN COLUMN The cracked hydrocarbon vapors leave the top of the reactor and enter a distillation column21 called the main column (Figure 5). The main column is fed superheated22 hydrocarbon vapor, with no additional heat added to the column during normal operation. Heat is removed from the column to cool and condense the gas feed for separation by removing heat in several loops called pumparounds. In these pumparounds, heat exchangers transfer heat to other process streams in the refinery, reducing the temperature of the streams returning to the main column. The main column separates the product from the reactor into light hydrocarbons and heavy naphtha (which are further processed to produce gasoline), light cycle oil, and slurry oil.

21 A distillation column is a type of process equipment that separates a feed mixture based upon the mixture’s various components’ boiling point temperatures. Components with lower boiling point temperatures (the more volatile components) leave the upper portion of a distillation column, while components with higher boiling point temperatures (the less volatile components) leave the lower portion of a distillation column. 22 A superheated vapor is hotter than its boiling point temperature. FIGURE 5 FCC unit main column

CSB · ExxonMobil Torrance Refinery Investigation Report 13 REGENERATOR COMBUSTION GAS The gas leaving the top of the regenerator is composed of combustion product gases entrained with catalyst particles.23 The gas is routed to the gas/catalyst separator (Figure 7) where most of the catalyst dust particles are removed from the combustion product gases. The gas, still containing some catalyst dust, flows through the expander, where the expansion of gas is used to partially power the main air blower. Heat is removed from the gas in the carbon monoxide (CO) boiler,24 and then the gas is routed to the ESP. The ESP collects most of the remaining small catalyst particles from the gas to meet California emissions regulations25 by using charged plates to attract the fine catalyst particles (Figure 6).26 This operation generates sparks—potential ignition sources—inside of the ESP.

23 The majority of the catalyst particles are removed from the regenerator combustion gas by “cyclones” inside of the regenerator. 24 The CO Boiler essentially serves as a heat exchanger, using the hot regenerator combustion product gas to generate steam for use around the refinery. When the FCC unit was originally designed, it burned CO flowing from the regenerator, but the process has since been modified so that all CO is now combusted in the regenerator. 25 SCAQMD, "Rule 1105.1, Reduction of PM10 and Ammonia Emissions from Fluid Catalytic Cracking Units," 07 November

  1. [Online]. Available: http://www.aqmd.gov/docs/default-source/rule-book/reg-xi/rule-1105-1.pdf?sfvrsn=4. [Accessed 07

March 2017]. 26 Figure from https://en.wikipedia.org/wiki/Electrostatic_precipitator#/media/File:Electrostatic_precipitator.svg [Accessed 07 March 2017]. FIGURE 6 The ESP removes catalyst particles using charged plates that produce sparks (as designed). FIGURE 7 Regenerator combustion gas flow to ESP (indicated by red arrows)

14 CSB · ExxonMobil Torrance Refinery Investigation Report HYDROCARBON LEAK TO AIR SIDE This report refers to the FCC unit as having two “sides” which are (1) the hydrocarbon side, and (2) the air side. The hydrocarbon side includes the reactor and the main column. The air side includes the regenerator and the piping and equipment downstream of the regenerator leading to the ESP (Figure 2). The SCSV and the RCSV are used to prevent undesirable mixing of air and hydrocarbons, which is an explosion hazard. During the Safe Park mode of operation (a standby mode of operation that the FCC unit was in on the day of the incident), the two valves isolate the air side and the hydrocarbon side from each other by maintaining a level of catalyst on top of the valves, forming a “plug” that prevents reactor process vapors from entering the regenerator, and vice versa (Figure 8). Discussed in Section 4.0, on the day of the incident, the SCSV did not maintain the catalyst plug. Hydrocarbons from the reactor flowed into the regenerator in the air side of the FCC unit, which in the Safe Park mode of operation was not sufficiently hot to burn (i.e. combust) the hydrocarbons. As a result, flammable hydrocarbons flowed to the ESP, where they mixed with air fed to the ESP from the CO boiler fans. Sparks within the ESP ignited the flammable mixture, causing an explosion.

FIGURE 8 During Safe Park, a catalyst level on top of the SCSV and RCSV is intended to prevent hydrocarbons and air from mixing.

CSB · ExxonMobil Torrance Refinery Investigation Report 15 4.0 INCIDENT DESCRIPTION On February 18, 2015, a mixture of hydrocarbons and air accumulated and exploded inside of the ESP. This section details the events that led to the explosion. Figure 9 shows a timeline of events in the days leading to the incident.

FIGURE 9 Timeline of events leading to explosion

16 CSB · ExxonMobil Torrance Refinery Investigation Report PRE-INCIDENT 4.1.1 INITIAL EXPANDER PROBLEMS The sequence of events leading to the incident began when the expander (located in the air side of the FCC unit—see Figure 2) started to experience vibration problems. The gas that flows through the expander contains a small amount of catalyst particles that may, over time, build up on the expander blades (Figure 10). Uneven distribution of this buildup causes the expander to vibrate excessively, which can cause significant damage to the expander. Torrance refinery instrumentation monitored the vibration of the expander so that when the expander vibration increased to a certain level, operators could clean the catalyst buildup from the expander blades. On the morning of Wednesday, February 11, 2015, the FCC expander started to experience increased vibration. On Thursday, February 12, 2015, workers cleaned the expander blades,27 and this temporarily reduced the expander vibration. Three days later on Sunday, February 15, 2015, however, the expander again began to experience high vibration.

  1. 1.2 MONDAY, FEBRUARY 16, 2015
  2. 1.2.1 EXPANDER EXCESSIVE VIBRATION AND SAFE PARK

On the morning of Monday, February 16, 2015, workers cleaned the expander blades again. This time, however, it did not reduce vibrations. Refinery personnel decided to assess expander vibrations further after a planned FCC unit rate increase, in case the increased flow through the expander reduced the vibration. The vibrations, however, worsened when the flow rate through the expander increased. At 12:50 PM, the vibrations reached a high limit, and the control system automatically began emergency shutdown to transition the unit into an idled state referred to by ExxonMobil as “Safe Park” (Figure 11). To put the unit into Safe Park, the following process changes occur automatically: (1) the spent and regenerated catalyst slide valves close; (2) hydrocarbon feed to the reactor riser stops; (3) the main air blower and expander are shut down; and (4) valves open to inject steam into the reactor riser. The main column pumparound loops continue to operate and hydrocarbons remain in the main column. In addition, the ESP remains energized.

27 When operators clean expander blades, they inject ground-up walnut shells into the flue gas just upstream of the expander. The intent is for the shells to scour the expander blades to remove catalyst, and with the catalyst removed, allow the expander rotor balance to be restored and thereby reduce expander vibrations. FIGURE 10 Catalyst buildup within expander. Photo was taken post-incident in 2015.

CSB · ExxonMobil Torrance Refinery Investigation Report 17

To prevent an explosion during Safe Park, ExxonMobil relied on two safeguards (Figure 12) to isolate flammable hydrocarbons in the hydrocarbon side of the unit from mixing with air in the air side of the unit. These safeguards include:28 (1) A level of catalyst accumulated on top of each closed slide valve to form a physical barrier; and

(2) Sufficient steam flow into reactor, which is used to generate a higher pressure in the reactor than in the main column to prevent hydrocarbons in the main column from backflowing into the reactor. Leading to the incident, both safeguards failed, allowing hydrocarbons from the main column to enter the air side of the FCC unit.

28 Allowing hydrocarbons and air to mix introduces an explosion hazard. FIGURE 11 Configuration of FCC unit in Safe Park FIGURE 12 In Safe Park configuration, the accumulated catalyst on top of the SCSV and steam pressurizing the reactor are intended to act as safeguards preventing hydrocarbons in the main column from backflowing through the reactor and to the regenerator.

18 CSB · ExxonMobil Torrance Refinery Investigation Report 4.1.2.2 FAILURE TO MAINTAIN REACTOR CATALYST LEVEL On February 16, 2015, when the FCC unit automatically transitioned to Safe Park, the control system moved both slide valves into the closed position. The SCSV, however, had severely eroded over six years of operation (see Section 5.3) and was unable to seal. As a result, within minutes after the FCC unit went into Safe Park and the SCSV closed, the catalyst particles from the reactor leaked through the SCSV and entered the regenerator (Appendix A). The SCSV safeguard failed because the damaged SCSV likely could not maintain a protective level of catalyst to isolate the reactor from the regenerator (Figure 13).

  1. 1.2.3 ATTEMPTS TO RESTART EXPANDER

With the unit in Safe Park, operators attempted to restart the expander to bring the FCC unit back online. After four unsuccessful restart attempts, refinery personnel worked to identify a strategy to repair the expander. Operations personnel predicted the expander could not restart because catalyst had likely accumulated between the expander blades and the expander casing, preventing the blades from rotating (Figure 14). At the direction of ExxonMobil management, operators began isolating the expander from the process to allow for visual inspection inside of the expander. The expander, however, could not be isolated using the typical safe isolation practices required by ExxonMobil safety procedures.

FIGURE 13 In Safe Park, the catalyst leaked through the closed SCSV, which was severely eroded from six years of operation and did not form a catalyst seal. FIGURE 14 ExxonMobil personnel predicted the expander could not restart due to catalyst buildup between the expander blades and casing. Photo taken following expander outage in 2012.

CSB · ExxonMobil Torrance Refinery Investigation Report 19 4.1.3 TUESDAY, FEBRUARY 17, 2015 On Tuesday, February 17, 2015, a meeting took place involving maintenance and machinery reliability personnel, the FCC unit operations manager, and the FCC unit business team manager. This group discussed a similar expander outage that occurred in 2012, when the company made an entry into the expander while the unit was in Safe Park to inspect its internals following a failed startup. For that expander entry operation, the Torrance refinery developed a “Variance,” a management-approved procedure deviation that allowed a departure from typical refinery equipment isolation requirements. ExxonMobil engineers developed, analyzed, and approved the expander isolation method detailed in the Variance in 2012 (see Section 5.2). Because ExxonMobil developed, approved, and successfully used the Variance in 2012, the group decided to re- use the same 2012 Variance to isolate the expander for visual inspection. The approved Variance is located in Appendix B of this report. On the afternoon of Tuesday, February 17, 2015, operators worked to isolate the expander for maintenance as specified in the Variance. Part of the required isolation was to install a blind29 in a flange at the expander outlet. Workers began opening the flange on the outlet of the expander so that they could install the blind.

INCIDENT 4.2.1 WEDNESDAY, FEBRUARY 18, 2015 On the morning of Wednesday, February 18, 2015, ExxonMobil maintenance workers approached the open flange to install the blind. They did not install the blind, however, because at that time steam was escaping from the open flange, and they were concerned about their safety (Figure 15). Steam leaking from the flange indicated that the SCSV, one of the safeguards specified in the Variance, did not fully seal and there was no catalyst barrier present. Post-incident, the CSB identified meeting notes written on the Wednesday morning prior to the incident by an ExxonMobil manager overseeing the expander maintenance that questioned, “Does the leaking spent slide valve invalidate the Variance?” The sequence of events leading to the incident, discussed below, indicate that ExxonMobil management decided to continue isolating the expander while the unit remained in Safe Park even though it was known that the SCSV was leaking.

29 A blind is a metal plate inserted between flanges to ensure positive isolation of a vessel from the process.

20 CSB · ExxonMobil Torrance Refinery Investigation Report

Because no protective catalyst level had developed on the closed SCSV, the reactor pressure generated by steam fed to the reactor was the only safeguard preventing hydrocarbons from the main column from entering the air side of the FCC unit. Steam enters the reactor from several feed locations (e.g. steam fed to the riser, and “stripping steam” fed to the stripping section of the reactor). ExxonMobil adjusted the steam flow to the reactor primarily by adjusting the riser steam, although stripping steam was also being fed to the reactor during Safe Park. The Variance specified that for the expander entry operation the reactor steam flow should not be reduced below 2,000 pounds per hour (Figure 16). On the day of the incident, ExxonMobil did not evaluate whether this minimum steam flow rate specified in the Variance was sufficient to prevent hydrocarbons from entering the regenerator, with the knowledge that the reactor steam—the only remaining safeguard which was used to pressurize the reactor—was leaking through the SCSV (Section 5.4). Hourly workers who may have been more familiar with a higher, more typical Safe Park steam flow rate were not included in evaluating the steam flow rate specified in the Variance (Section 5.4). FIGURE 15 On the morning of the incident, steam leaked out of the open expander outlet flange. Steam from the reactor had leaked through the eroded SCSV, through the FCC unit air side piping and equipment, and out of the open flange.

CSB · ExxonMobil Torrance Refinery Investigation Report 21

Relying on the minimum specified 2,000 pounds per hour reactor steam rate, the operations shift supervisor instructed the board console supervisor30 to reduce the steam flow through the riser in an attempt to reduce the amount of steam releasing from the expander outlet flange, so workers could safely access the flange. By 7:16 AM, the steam flow rate through the riser had been decreased from approximately 20,000 pounds per hour to approximately 7,500 pounds per hour.31 Unknown to operations personnel at the time, however, the reactor pressure was now too low to prevent hydrocarbons from backflowing from the main column into the reactor. Hydrocarbons from the main column (as will be discussed in Section 5.5 was at a higher-than-typical pressure due to accumulation of light hydrocarbons from a heat exchanger tube leak) flowed into the reactor and entered the air side of the FCC unit through the leaking SCSV (Figure 17). At 8:07 AM, a maintenance supervisor working in the FCC unit received an alarm on his personal hydrogen sulfide32 (H2S) monitor.33 H2S is present in the FCC unit hydrocarbons, and the alarm indicated that hydrocarbons were likely leaking from an unanticipated location. Refinery personnel, however, continued working near the expander. At approximately 8:40 AM, H2S monitors on multiple workers around the expander

30 The console supervisor operates the control board of the FCC unit. At other refineries, this person may be called a “board operator.” 31 In addition to the riser steam, other sources of steam entered and pressurized the reactor. The board console supervisor, however, was primarily managing steam flow rate using the riser steam as other steam feed to the reactor was operated primarily by manual valves. During the course of the morning, the total reactor steam was reduced from about 45,000 pounds per hour to about 18,000 pounds per hour. 32 Hydrogen sulfide is a colorless gas that has the odor of rotten eggs. The gas is heavier than air, toxic and flammable. Hydrogen sulfide is present in many types of crude oils processed in refineries. 33 H2S levels that were recorded on the day of the incident for the majority of the workers were at or below the Occupational Safety and Health Administration (OSHA) exposure limits. One contract worker was exposed to levels that were at the level that is specified as immediately dangerous to life and health. FIGURE 16 The 2012 Variance that was approved for use in 2015 specified that the reactor steam flow rate should not fall below 2,000 pounds per hour. (emphasis added)

22 CSB · ExxonMobil Torrance Refinery Investigation Report outlet flange activated, indicating that hydrocarbons were leaking out of the expander flange. At this point, operators began evacuating personnel from the FCC unit. Operations staff increased the steam flow up the reactor riser to 35,000 pounds per hour, but this action was taken too late; hydrocarbons had already entered the air side of the FCC unit and were flowing towards the ESP. The hydrocarbons soon reached the ESP and mixed with air flowing into the ESP from fans on the CO Boiler.34 At 8:48 AM, the flammable mixture ignited inside of the ESP, causing an explosion.35 See Appendix A for a full analysis of the relevant pressures, flow rates, and catalyst level data leading to the incident, and how they compare to the similar 2012 operation.

34 The CO Boiler fans were operated during a separate troubleshooting activity being performed simultaneously to the expander isolation attempt. 35 Light naphtha, the primary hydrocarbons that entered the ESP, has a lower explosive limit of approximately 1.0 volume %. See ExxonMobil, "Material Safety Data Sheets, 3139 Naphtha," [Online]. Available: http://www.msds.exxonmobil.com/IntApps/psims/SearchResults.aspx. [Accessed 07 March 2017]. FIGURE 17 When steam flow rate was reduced through the reactor riser, reactor pressure could no longer prevent hydrocarbon backflow from the main column. Hydrocarbons leaked through closed SCSV, through FCC unit air side piping and equipment, and to the energized ESP. A hydrocarbon/air mixture ignited inside of the ESP.

CSB · ExxonMobil Torrance Refinery Investigation Report 23 INCIDENT CONSEQUENCES The explosion severely damaged the ESP (Figure 18). Debris from the explosion hit equipment near the ESP, causing two small fires and multiple leaks of flammable liquids. The explosion debris also punctured a heat exchanger that was out-of-service. Four contract employees who were working nearby sought first aid for injuries sustained while fleeing the area. Debris also fell on a building frequently used by operators, though was unoccupied at the time. In addition, catalyst dust was reported outside of the refinery property in the nearby community.36,37

A large piece of debris from the explosion fell on scaffolding38 around two settler tanks, each containing hydrofluoric acid (HF), water, hydrocarbons, and a chemical additive intended to reduce the amount of HF vaporized during a loss of containment event39 (Figure 19). Pure HF is a highly toxic chemical that can seriously injure or cause death at a concentration of 30 ppm.40 ExxonMobil resisted CSB requests for safety information pertaining to the potential release of HF in the event the tanks were struck by explosion debris. ExxonMobil continues to refuse to provide the CSB with information detailing safeguards to prevent or mitigate a release of HF. The CSB has issued subpoenas for this information, and is pursuing enforcement in US Federal district court.41

36 The South Coast Air Quality Management District (SCAQMD) performed monitoring in the community after the incident, including a composition analysis of the “fall out.” See SCAQMD, "Report on ExxonMobil Torrance Refinery Incident of February 18, 2015; SCAQMD Response and Sampling & Analysis Efforts," [Online]. Available: http://www.aqmd.gov/docs/default-source/compliance/exxonmobil-02182015.pdf. [Accessed 07 March 2017]. 37 U.S. Chemical Safety and Hazard Investigation Board, "Transcript from 1.13.2016 Public Meeting (30015_Exxon public meeting pt1)," 13 January 2016. [Online]. Available: http://www.csb.gov/assets/1/19/Public_meeting_transcript.pdf. [Accessed 07 March 2017]. 38 The scaffolding was temporarily in place for work being done on the alkylation unit. 39 The CSB was not provided with documentation quantifying the resulting effect of the chemical additive on a potential HF release, and as such the CSB cannot comment on the effectiveness of this additive. ExxonMobil did present CSB investigators with a presentation on MHF. 40 The National Institute for Occupational Safety and Health (NIOSH), "NIOSH Pocket Guide to Chemical Hazards, Hydrogen fluoride," 11 April 2016. [Online]. Available: https://www.cdc.gov/niosh/npg/npgd0334.html. [Accessed 27 February 2017]. 41 ExxonMobil has not provided this information to the CSB because they have stated that the requested documents are not within the CSB’s jurisdiction in investigating the causes of the February 18, 2015 incident. FIGURE 18 Damage to the ESP from the explosion. White catalyst dust from the ESP is visible on the ground in left photo.

24 CSB · ExxonMobil Torrance Refinery Investigation Report 4.3.1 CATALYST DUST REACHING COMMUNITY Some members of the local community are concerned about potential health effects from catalyst exposure, as a result of the ESP explosion and dispersion of catalyst dust.42,43 The CSB is not aware44 if there are long-term health effects from exposure to this catalyst.45 The CSB therefore cannot make a statement regarding the toxicity or potential health effects of the catalyst dust. In this report, the CSB identifies the events and conditions that led to the February 18, 2015 ESP explosion, with the goal of preventing other similar incidents in refineries and communities across the country. The findings, key lessons, and recommendations from this report can help the refining industry learn from this incident. This report does not analyze the health effects of catalyst dust exposure.

42 U.S. Chemical Safety and Hazard Investigation Board, "Transcript from 1.13.2016 Public Meeting (30015_Exxon public meeting pt1)," 13 January 2016. [Online]. Available: http://www.csb.gov/assets/1/19/Public_meeting_transcript.pdf. [Accessed 07 March 2017]. See statement by Alicia Rivera. 43 In the hours immediately following the explosion, the community was given mixed alerts from various responding agencies regarding whether to shelter-in-place. 44 CSB subpoenaed health studies of the catalyst from ExxonMobil. ExxonMobil provided the CSB with safety data sheets on the catalyst. The CSB has not been able to review any health studies of the catalyst dust 45 The South Coast Air Quality Management District (SCAQMD) performed monitoring in the community after the incident, including a composition analysis of the “fall out.” See SCAQMD, "Report on ExxonMobil Torrance Refinery Incident of February 18, 2015; SCAQMD Response and Sampling & Analysis Efforts," [Online]. Available: http://www.aqmd.gov/docs/default-source/compliance/exxonmobil-02182015.pdf. [Accessed 07 March 2017]. FIGURE 19 Explosion debris landed in close proximity to alkylation unit settler tanks containing HF, water, hydrocarbons, and a chemical additive intended to reduce the amount of HF vaporized during a loss of containment event.

CSB · ExxonMobil Torrance Refinery Investigation Report 25 5.0 CAUSAL ANALYSIS OF FEBRUARY 18 EXPLOSION The CSB identified key factors that contributed to a flammable mixture accumulating inside of the ESP on the day of the incident. An Acci-Map46 depicting the CSB causal analysis is located in Appendix C. The key causal factors include the following:

  1. ExxonMobil relied on indirect operating parameters to measure critical safeguards for the Safe Park

mode of operation. The relied-upon operating parameters did not signify that the FCC unit was in a dangerous condition leading to the incident. In addition, ExxonMobil had not developed a Safe Park procedure for how to safely operate within specified safe operating limits (Section 5.1);

  1. In 2015, ExxonMobil relied on a Variance that had been developed in 2012, without verifying that the

safeguards specified in the Variance were sufficient (Section 5.2);

  1. Erosion damage that had developed over six years of operation likely compromised the SCSV, and it

could not maintain a catalyst barrier while the FCC unit was in Safe Park (Section 5.3);

  1. Steam flow to the reactor had been reduced, likely causing a pressure deviation that allowed

hydrocarbons to enter the flue gas system (Section 5.4);

  1. A leaking heat exchanger in the slurry oil pumparound allowed light hydrocarbons to enter and

pressurize the main column to a higher-than-typical pressure (Section 5.5);

  1. ExxonMobil did not shut down the FCC unit when it was identified that the SCSV leaked and had not

established a catalyst barrier (Section 5.6);

  1. The expander could not be effectively isolated while the unit was in Safe Park. ExxonMobil opened

process equipment without conforming to refinery standards (Section 5.7); and

  1. The ESP remained energized when hydrocarbons entered the flue gas system, providing an ignition

source to trigger the explosion (Section 5.8). This section discusses each of these factors that contributed to the incident.

46 An Acci-Map is a causal diagram of a major incident. The different levels of causation that led to the incident are visually indicated. These levels include physical condition causes, site and/or corporate causes, industry codes and standards causes, and regulatory causes. The Acci-Map was originally developed by Jens Rasmussen in the article J. Rasmussen, "Risk Management in a Dynamic Society: A Modelling Problem," Safety Science, vol. 27, no. 2/3, pp. 183-213, 1997. The Acci- Map was subsequently used and popularized by Andrew Hopkins, in A. Hopkins, Lessons from Longford: The Esso Gas Plant Explosion, CCH Australia, 2000.

26 CSB · ExxonMobil Torrance Refinery Investigation Report

This report discusses three types of equipment isolation methods: (1) single block and bleed; (2) double block and bleed; and (3) blinding equipment. Single Block and Bleed

A single block valve is closed to isolate the equipment from the process. A bleed valve between the closed block valve and the equipment is opened to remove process fluid from the piping. The pressure between the closed block valve and the bleed valve is measured to (1) verify the piping has been emptied and (2) to detect a pressure increase due to leakage of the closed block valve.

Double Block and Bleed

Two block valves in series are closed to isolate equipment from the process. A bleed valve between the two closed block valves is opened to remove process fluid from between the valves. A bleed valve between the second closed block valve and the equipment is also opened to remove process fluid between that block valve and the equipment. The pressure between the two closed block valves, and between the second closed block valve and the equipment, is measured to (1) verify the piping has been emptied and (2) to detect a pressure increase due to leakage of the closed block valve(s).

Blinding Equipment

A blind is a solid metal disc that is inserted into a pipe flange, preventing the flow of process fluid to the equipment to be isolated. The use of a blind is often referred to as “positive isolation.” The piping upstream of the blind is often isolated by a single or double block and bleed. Figures based upon Health and Safety Executive (HSE). The Safe Isolation of Plant and Equipment, HSG253, pg. 26, 2006. http://www.hse.gov.uk/pubns/priced/hsg253.pdf Equipment Isolation Methods More Robust

CSB · ExxonMobil Torrance Refinery Investigation Report 27 LACK OF SAFE PARK PROCEDURE AND VERIFIABLE OPERATING PARAMETERS The Occupational Safety and Health Administration (OSHA) Process Safety Management (PSM) regulation requires chemical processing facilities to develop operating procedures for each operating phase—including temporary operations such as Safe Park—that detail safe operating limits, consequences of deviation, and the steps required to correct or avoid the deviation.47 ExxonMobil had developed a procedure to enter Safe Park, and a procedure to transition from Safe Park back to normal operation. ExxonMobil had not, however, developed a procedure that detailed how to safely operate the FCC unit while in Safe Park.48 Despite the additional safety management system flaws that led to this incident, which will be discussed later in this report, the development of and adherence to a robust procedure that established Safe Park safe operating limits and the conditions that required emergency shutdown could have prevented this incident. At the time of the incident, ExxonMobil relied on two safeguards to prevent hydrocarbons from the main column from reaching the air side of the FCC unit: (1) a reactor pressure higher than the main column pressure, established by steam fed to the reactor; and (2) a catalyst barrier on top of the closed SCSV. ExxonMobil, however, relied on indirect operating parameters to maintain the two safeguards. Table 1 shows the two safeguards relied upon in Safe Park, the indirect operating parameters ExxonMobil used to monitor these safeguards, and examples of potential direct operating parameters ExxonMobil might have used to better verify that the safeguards were available. Safe Park Safeguards ExxonMobil Indirect Operating Parameters Used to Monitor Safeguards Example Direct Operating Parameters to Verify Safeguard Availability Accumulated catalyst above closed SCSV SCSV valve position (Variance specifies SCSV will be in closed position) Catalyst level above closed SCSV (e.g. by using differential pressure measurement or a level indicator) Reactor pressure greater than main column pressure Reactor steam flow rate (Variance specifies 2,000 pounds per hour steam flow rate) Differential pressure measurement between reactor and main column, to ensure reactor pressure is higher than main column pressure

47 29 C.F.R. § 1910.119(f). 48 Cal/OSHA issued ExxonMobil a citation for “fail[ing] to develop and implement a safe-park procedure for the FCC Unit during the FCC emergency shutdown.” It was classified as a “Serious” violation, with a proposed penalty of $7,200.00. See State of California, Department of Industrial Relations, "Citation and Notification of Penalty, ExxonMobil Refining & Supply Company," 13 August 2015. [Online]. Available: http://www.dir.ca.gov/dosh/citations/ExxonMobil.Signed-Citation- Documents.1042440.pdf. [Accessed 03 March 2017]. ExxonMobil relied on indirect operating parameters to measure critical safeguards for the Safe Park mode of operation. The relied-upon operating parameters did not signify that the FCC unit was in a dangerous condition before the incident. ExxonMobil did not develop a Safe Park procedure for how to safely operate within specified safe operating limits, with specified operating parameters that could directly verify the critical Safe Park safeguards. Safe Park procedure development and improved measurement and control of critical process conditions could have prevented this incident. TABLE 1 Comparison of ExxonMobil’s operating parameters to monitor safeguards and possible alternative operating parameters

28 CSB · ExxonMobil Torrance Refinery Investigation Report To maintain the reactor pressure above the main column pressure, ExxonMobil specified a minimum steam flow rate (2,000 pounds per hour) to feed to the reactor. Operating at this flow rate did not, however, ensure that the reactor pressure was kept above the main column pressure. A better parameter to measure could have been the differential pressure between the reactor and the main column. Because it was critical to maintain the reactor pressure above the main column pressure, ExxonMobil could have installed instrumentation to measure the differential pressure between the reactor and main column, specifically for use during Safe Park. ExxonMobil could have required in a Safe Park procedure for operators to monitor the differential pressure and adjust the riser steam flow rate to confirm the reactor pressure was maintained sufficiently above the main column pressure. As a potentially more robust system, ExxonMobil could also have configured the process control system to automatically adjust the riser steam flow rate to maintain the target reactor/main column differential pressure. Finally, ExxonMobil should have specified in a Safe Park procedure the minimum pressure differential that indicated the inability to maintain the differential pressure necessary to prevent dangerous backflow. This low differential pressure safety limit should have automatically, or as a minimum through operator required action, triggered a full unit shutdown to prevent hydrocarbon backflow and ignition in the ESP. ExxonMobil relied on SCSV position (i.e. closed SCSV) to indicate if a catalyst barrier was developed during Safe Park. As demonstrated by this incident, SCSV position does not provide information on the catalyst level above the SCSV. ExxonMobil should have specified process parameters for operators to monitor that could confirm the existence of a catalyst barrier. For example, a Safe Park procedure could have required operators to monitor the differential pressure between the SCSV standpipe and the regenerator (see Appendix A for 2012 and 2015 differential pressure data) to confirm that a catalyst barrier had been established. Alternatively, ExxonMobil could have measured the catalyst level in the SCSV standpipe. In addition, ExxonMobil should have specified in a Safe Park procedure the minimum limit (e.g. minimum differential pressure or minimum level) that should trigger full unit shutdown to prevent hydrocarbon backflow and ignition in the ESP. It is essential that refineries and chemical process facilities:

  1. Establish the upper and lower safe operating limits for all modes of

operation;

  1. Develop procedures for all modes of operation that detail those safe upper

and lower operating limits, and consequences of deviation;

  1. Configure process instrumentation to measure critical process conditions,

so that operators can monitor and control the process such that it is within the intended safe operating limits; and

  1. Include in procedures the values for process parameters that represent the

boundaries of safe upper and lower operating limits that require pre- KEY LESSON

It is essential to identify and define safe operating limits for all modes of operation, and measure process conditions and parameters that can verify the operation of the process relative to those safe operating limits. When a facility relies on operating parameters that only indirectly provide information on critical process parameters, it can lead to the inability to identify when a process is in an unsafe condition.

CSB · ExxonMobil Torrance Refinery Investigation Report 29 determined corrective action (e.g. unit shutdown). Define the steps for these pre-determined actions, whether implemented in a Safety Instrumented System or by operator action. Had ExxonMobil developed such a procedure, process controls, and pre-defined safe operating limits for Safe Park, this incident could have been prevented.

RELIANCE ON 2012 VARIANCE 5.2.1 DEVELOPMENT OF 2012 VARIANCE In 2012, an event similar to the 2015 expander shutdown occurred in the Torrance refinery; in 2012, the FCC unit had entered Safe Park due to a power outage, and when personnel attempted to re-start the expander, it would not restart. At the time, ExxonMobil believed catalyst buildup was preventing the expander blades from rotating. To verify the problem, refinery personnel planned to perform an entry into the expander to identify the expander operation problem. Safe entry into process equipment such as the expander typically requires blinding the process piping leading to the equipment that will be entered. The inlet piping to the expander, however, could not be blinded in its existing configuration; rather, blinding the expander inlet required removing a pipe spool piece. ExxonMobil justified not blinding the expander inlet by stating that “[t]he dropping of the expander inlet spool would present more hazards (including hand rigging, critical lifts, etc.) and more hours of exposure to personnel under unplanned conditions” than if they relied on a single block and bleed instead of a blind.49 In this scenario, using a single block and bleed to isolate equipment for a confined space entry was not consistent with standard ExxonMobil safety policies. As previously discussed, ExxonMobil allows deviation from safety policies as long

49 ExxonMobil did not consider fully shutting down the unit to perform the expander maintenance. Leading to the incident, ExxonMobil chose to perform maintenance on the expander using a management- approved deviation from typical site safety policies. They chose to re-use a “Variance” procedure developed for a previous maintenance operation conducted in 2012. Leading to the incident, however, ExxonMobil management trusted the validity of the Variance procedure without ensuring the safeguards specified were sufficiently robust. The safeguards specified in the Variance procedure were not sufficient for the 2015 expander maintenance, and because they were not technically analyzed prior to the incident this deficiency was never identified. This section discusses the 2012 development of the expander maintenance Variance and its implementation in 2015. FIGURE 20 Safeguards specified in 2012 Variance

30 CSB · ExxonMobil Torrance Refinery Investigation Report as a Variance—a departure from ExxonMobil policies—is developed and analyzed for safety prior to performing the work. ExxonMobil engineers therefore developed a Variance in 2012 to perform the expander entry. In a conversation about the Variance procedure, ExxonMobil engineers discussed that both a steam barrier and a catalyst barrier (Figure 20) were necessary to safely perform the confined space entry to prevent hydrocarbons from entering the expander, but they were still uncertain whether the discussed isolation strategy complied with ExxonMobil safety practices (Figure 21).

Nevertheless, ExxonMobil refinery management developed and approved the Variance for use in 2012. As specified in the Variance, in 2012 refinery personnel conducted the expander entry with the following unit configuration (Figure 22): • Single block and bleed of expander inlet as opposed to blinding; • Blind installed at expander outlet; • SCSV and RCSV in closed position (Note: accumulated catalyst on top of valves was not specified in the Variance even though it was discussed by the engineers in Figure 21); • Steam flowing to the reactor, specified as a minimum of 2,000 pounds per hour (Note: No analysis was presented for this steam flow rate. Actual riser steam flow rate was about 7,000 pounds per hour. See Appendix A.); and • Unit was in Safe Park, with ESP energized. In 2012, refinery personnel conducted the expander entry with no incident. Process data indicates that a catalyst barrier accumulated on top of the closed SCSV (Appendix A). No hydrocarbons entered the flue gas system during the confined space entry. FIGURE 21 Conversation between ExxonMobil engineers during development of Variance in 2012

CSB · ExxonMobil Torrance Refinery Investigation Report 31

  1. 2.2

USE OF 2012 VARIANCE IN 2015 Discussed above, in February 2015 the expander automatically shut down (Section 4.1.2) and ExxonMobil refinery management wanted to enter the expander to identify why the expander would not restart. Personnel involved with the 2015 expander troubleshooting had participated in the 2012 expander entry, and believed that a similar entry would be required to identify the expander startup problem. ExxonMobil management decided to re-use the 2012 Variance to perform a confined space entry into the expander. In 2015, however, no formal meetings or discussions were held to discuss the validity of the Variance. Rather, one FCC unit manager presented the 2012 Variance to five management personnel individually, seeking their approval. No managers considered whether the condition of the FCC unit was the same as it was in 2012. No one conducted a safety analysis to identify whether the safeguards in place for the 2012 confined space entry were still adequate for the 2015 planned operation. As discussed below, the steam and catalyst safeguards discussed by the engineers in 2012 and specified in the 2012 Variance were not adequate or were not maintained during preparation for expander entry in 2015. FIGURE 22 Equipment configuration specified in 2012 Variance KEY LESSON

When implementing a deviation from an existing procedure, it is critical that the company conduct a management of change to—among other requirements—verify and authorize the technical basis, the implementation time period, and identify any new or affected hazards and associated mitigation strategies. If the procedure deviation is saved for future use, before implementing the procedure the company should verify that the underlying conditions, activities, and technical assumptions that were the basis for the initial authorization are in place and are still valid.

32 CSB · ExxonMobil Torrance Refinery Investigation Report

SPENT CATALYST SLIDE VALVE FAILURE Following the February 18, 2015 incident, the CSB inspected the internal components of the SCSV. The inspection found the valve internals to be severely eroded to the point that the valve could not seal. An area of approximately 16 square inches eroded away during six years of operation, providing an open path for catalyst to flow through the valve even when in the fully closed position. The erosion prevented the closed SCSV from developing the necessary catalyst barrier on the day of the incident. Photos of the erosion identified in the SCSV are shown in Figure 23. FIGURE 23 SCSV erosion identified post-incident The Spent Catalyst Slide Valve (SCSV) is a control valve that controls the flow of catalyst from the reactor to the regenerator.

During normal operation, the disc inside of the SCSV is partially open to regulate the catalyst flow to the regenerator. The continuous flow of abrasive catalyst through the partially open valve erodes both the disc and the sealing surfaces of the valve.

SCSV diagram from http://www.tapcoenpro.com/fccu-slide- valves/ (accessed January 10, 2017) Spent Catalyst Slide Valve The 2012 Variance specified the closed SCSV as a safeguard, with the intent for it to develop a catalyst level above it to prevent the backflow of hydrocarbons to the regenerator. On the day of the incident, however, the SCSV could not function as an effective safeguard during Safe Park because it had severely eroded during its six years of operation. Leading to the incident, ExxonMobil refinery personnel became aware that the SCSV was not an effective safeguard during Safe Park, but they continued with their expander maintenance attempt. This section discusses the history of erosion of the SCSV, ExxonMobil’s failure to effectively test the sealing capability of the valve, the refinery’s extended use of the SCSV beyond its established safe operating life, and the absence of an effective risk analysis to identify the safety consequences of valve failure during Safe Park.

CSB · ExxonMobil Torrance Refinery Investigation Report 33 5.3.1 SCSV TESTING STRATEGY INEFFECTIVE When the FCC unit entered Safe Park on February 16, 2015, the SCSV automatically closed. The SCSV is classified by ExxonMobil as a “safety critical device.”50 As discussed previously, for the SCSV to perform its safety function to prevent undesirable mixing of air and hydrocarbons while the FCC unit was in Safe Park, ExxonMobil relied on the SCSV to sufficiently seal so that catalyst particles could accumulate on top of the valve and form a plug (Section 3.4). The CSB notes, however, that the SCSV is a control valve, and the use of the SCSV in this way treats it as a block valve which may be beyond its design intent. With this qualifier, the CSB discusses in this section the deficiencies that resulted in the SCSV not sufficiently sealing during the 2015 Safe Park. The SCSV operates in a severely erosive service. The continuous flow of abrasive fluidized catalyst particles during normal operation erodes the slide valve internals, which can prevent the valve disc from sealing. ExxonMobil repaired the SCSV internals during turnarounds in 2000, 2004, and 2009 because the valve had eroded. An ExxonMobil “Equipment Degradation Document” details the likelihood of SCSV inability to seal due to erosion of the valve (Figure 24).

The Equipment Degradation Document predicts the probability of failure of the SCSV due to erosion, based upon a four- to five-year run length of the FCC unit between turnarounds. To ensure effective operability of the valve, ExxonMobil assigned it a testing interval of every four years to make sure the valve could function as required to prevent a flow reversal during normal operation. To meet the four-year testing requirement, ExxonMobil periodically partially closed the SCSV while the unit operated to verify that the mechanical valve components functioned properly. While an important mechanical testing strategy, this testing method did not evaluate whether the valve was eroded, or test whether the SCSV could close and seal. ExxonMobil therefore relied on the

50 ExxonMobil defines a “safety critical device” as the last line of defense against, or to be used to mitigate the consequences of, a significant undesirable process incident. FIGURE 24 ExxonMobil Equipment Degradation Document

34 CSB · ExxonMobil Torrance Refinery Investigation Report SCSV—specified as a safety-critical device—without verifying that it could perform its safety function of preventing air and hydrocarbons from mixing when the unit was in Safe Park. To effectively assess the integrity of the SCSV internals, the valve had to be visually inspected to identify erosion that could prevent the valve from performing its Safe Park safety-critical function—sufficiently sealing to develop a catalyst barrier.51 At the time of the incident, however, ExxonMobil had been operating the SCSV since January 2009—over six years—and had not performed a visual inspection after the 4-5 year run length specified in the Equipment Degradation Document. ExxonMobil therefore operated the SCSV without verifying that the valve could perform its safety-critical function. As a result, on the day of the incident, the eroded SCSV could not establish a catalyst safeguard and did not prevent hydrocarbons from entering the air side of the FCC unit. 5.3.2 EXTENDED OPERATION OF SCSV ExxonMobil performed FCC unit turnarounds in 2000 and 2004. The refinery scheduled the next turnaround for April 2009, but due to timing of other projects taking place in the FCC unit, it was split into two turnarounds that took place in January 2009 and March 2010. ExxonMobil replaced the SCSV during the January 2009 turnaround. ExxonMobil planned to conduct its next FCC unit turnaround in June 2015. This turnaround timing meant that the SCSV would operate for over six years. ExxonMobil did not perform a risk evaluation (e.g. management of change) to identify the safety consequences of operating the SCSV for the extended period. ExxonMobil also did not schedule its turnaround to accommodate the safe operating life of the safety-critical SCSV.

51 Putting the FCC Unit into Safe Park also tests the ability of the SCSV to hold catalyst. If the valve is too eroded to hold a catalyst level above it, however, that protective barrier is lost. This therefore may be an unsafe method to test the SCSV. KEY LESSON

It is essential to schedule and perform maintenance of safety-critical equipment so that the equipment is available to perform its safety-critical function.

CSB · ExxonMobil Torrance Refinery Investigation Report 35 5.3.3 DAMAGE MECHANISM HAZARD REVIEW INEFFECTIVE ExxonMobil performed a damage mechanism hazard review52 of the SCSV. The hazard review correctly identified that erosion was a damage mechanism that affected the SCSV. ExxonMobil, however, identified only a financial consequence of SCSV failure by erosion. Despite the SCSV classification as a safety- critical device, the company did not identify a safety and health consequence (Figure 25). The CSB found that ExxonMobil considered only normal operating conditions when identifying consequences of failure. ExxonMobil did not consider that an eroded SCSV may not maintain a catalyst plug while the FCC unit was in Safe Park.

  1. 3.4 WORK PROGRESSED ON DAY OF INCIDENT WHEN IT WAS

KNOWN SCSV WAS LEAKING ExxonMobil management knew the SCSV was leaking leading up to the incident. Notes from meetings of management personnel questioning “Does the leaking spent slide valve invalidate the variance?” (Figure 26) and CSB interviews demonstrate that managers knew and discussed that the SCSV was leaking on the day of the incident. The catalyst level in the reactor—showing zero level—was displayed on the FCC unit console, measurements of high temperature downstream of the slide valve indicated that steam was leaking through the slide valve, and steam was visually observed leaking from multiple locations on the air side of the FCC unit.

52 ExxonMobil called the damage mechanism hazard review an “Equipment Strategy Document.” FIGURE 25 ExxonMobil damage mechanism hazard review of SCSV erosion identified no safety consequence. “SHE” stands for “Safety, Health, and Environment.” (emphasis added) KEY LESSON

It is important to consider all modes of operation— including non-routine operations such as unit standby—when performing process hazard analyses. Incident scenarios could be possible during non- routine modes of operation that may not have been considered when analyzing process hazards for normal, continuous operation.

36 CSB · ExxonMobil Torrance Refinery Investigation Report Despite the leaking SCSV, ExxonMobil continued to try to isolate the expander from the process. At that point, the company relied solely on steam as a barrier to prevent the flow of hydrocarbons into the air side of the FCC unit. ExxonMobil did not, however, perform a risk analysis of whether steam was a sufficient safeguard, and did not analyze the steam flow rate necessary to prevent hydrocarbons from entering the air side of the FCC unit (Section 5.4). And as discussed in Section 5.1, had ExxonMobil previously developed and followed a pre-established Safe Park operating procedure, it may have required unit shutdown when the catalyst barrier was lost.

  1. 3.5

OPPORTUNITY FOR SAFER DESIGN As demonstrated by this incident, an SCSV may not effectively seal and develop a catalyst barrier during Safe Park. The CSB learned that some FCC units include two SCSVs in series between the reactor and regenerator. The second SCSV operates only when the unit enters Safe Park, functioning as a block valve to accumulate a catalyst barrier. This strategy may reduce the potential of relying on an eroded SCSV to establish a catalyst barrier.

FIGURE 26 Notes from day of incident show that ExxonMobil knew of leaking SCSV. (emphasis added) KEY LESSON

Companies should develop operating procedures for all modes of operation—including unit standby—that detail safe operating limits, consequences of deviating from those limits, and specified actions to implement in the event the process deviates outside of its safe operating limits.

CSB · ExxonMobil Torrance Refinery Investigation Report 37 STEAM BARRIER FAILURE In Safe Park, steam is the second barrier between the hydrocarbon and air side of the FCC unit. It is used to pressurize the reactor pressure above the main column pressure. Steam flows into the reactor from several feed locations, one of which is the reactor riser, separating air in the regenerator from hydrocarbons in the main column (Figure 27).

On the morning of February 18, 2015, steam leaked out of the open expander flange. ExxonMobil operations management instructed the console supervisor to reduce the steam flow rate—in an attempt to reduce the amount of steam exiting the expander outlet flange—to allow maintenance workers to install a blind safely. The console supervisor reduced the steam riser flow rate to about 7,500 pounds per hour. The company based this reduction in steam flow on the 2012 Variance, which specified a minimum steam flow rate of 2,000 pounds per hour. But by reducing the steam flow to 7,500 pounds per hour, the reactor pressure fell below the main column pressure. The reduced reactor pressure could no longer prevent hydrocarbons from the main column from entering the reactor, then flowing into the regenerator and the flue gas system. In the 2012 Safe Park, the steam flow into the riser was reduced to approximately 6,500 pounds per hour during the expander maintenance work. During that 2012 expander maintenance operation, the catalyst barrier remained above the closed SCSV and the main column pressure was lower than its pressure in 2015 (Appendix A). FIGURE 27 ExxonMobil FCC unit emergency shutdown procedure specifies that steam is a buffer (safeguard) between hydrocarbons and air. (emphasis added) Despite it being the only remaining safeguard preventing hydrocarbons from flowing to the energized ESP, ExxonMobil never calculated the steam flow rate required to pressurize the reactor to prevent hydrocarbons from backflowing to the air side of the FCC unit. This section discusses ExxonMobil’s reliance on and lack of analysis of the 2,000 pounds per hour steam flow rate specified in the 2012 Variance, which was never technically analyzed by ExxonMobil prior to the 2015 expander maintenance attempt.

38 CSB · ExxonMobil Torrance Refinery Investigation Report When ExxonMobil developed the Variance in 2012, the company performed no analysis and provided no justification for the 2,000 pounds per hour steam flow rate. On the day of the incident, although ExxonMobil knew the catalyst safeguard was not in place, no one conducted an analysis to determine whether the 2,000 pounds per hour steam rate specified in the Variance was sufficient—even though it served as the only remaining safeguard preventing hydrocarbons and air from mixing. Had ExxonMobil conducted a safeguard analysis, they may have required a higher minimum steam flow rate, or decided to shut down the FCC unit before the expander maintenance could be safely conducted. The CSB also found that FCC unit operators were not included in the 2012 Variance development process and were not consulted on the day of the incident about the 2,000 pounds per hour steam flow rate specified in the Variance. An ExxonMobil FCC unit operator expressed to the CSB doubts about relying on the 2,000 pounds per hour steam flow rate: I asked about the amount of steam because it said 2,000 pounds [per hour], and I said, “Shouldn’t it be a lot higher than that?” And [my supervisor]’s like “No, the engineers have looked at it.” I said, “Okay.” ExxonMobil can improve the safety analysis of a proposed Variance by requiring a multi-disciplinary team—composed of a technical expert such as a process engineer, a safety and health representative, and an experienced operator on the applicable unit—to review the proposed Variance before its approval and implementation.

KEY LESSON

Robust management of change practices are needed when making changes to procedures. Similar to PHAs, conducting management of change as a multidisciplinary group— composed of individuals with different areas of expertise—can assist in identifying hazards introduced by the procedure change.

CSB · ExxonMobil Torrance Refinery Investigation Report 39 HEAT EXCHANGER TUBE LEAK On the day of the incident, a higher than normal pressure in the main column allowed hydrocarbons to enter the reactor with the riser steam flow rate reduced to 7,500 pounds per hour. Leading to the incident, the main column operated at a pressure of about 8.5 psig, roughly double the main column pressure during the 2012 Safe Park (see Appendix A). In 2015, the column pressure had increased because a heat exchanger—that had an extended operation—on the slurry oil pumparound loop was leaking naphtha into the slurry oil (Figure 28 and Figure 29). The high temperature of the slurry oil vaporized the more volatile naphtha, which increased the pressure of the main column. The heat exchanger that leaked naphtha into the slurry oil pumparound was one of two heat exchangers that provided heat to a distillation column in a neighboring unit. The heat exchangers were designed so that one heat exchanger could be operated while the second heat exchanger remained on standby. The standby exchanger was clean and ready for use when the operating heat exchanger had to be taken offline for cleaning, inspection, and maintenance. FIGURE 29 Post-incident photos of heat exchanger tube bundle that leaked naphtha into main column slurry oil pumparound FIGURE 28 Leaking heat exchanger tube allowed light naphtha to enter main column. Tubes in a heat exchanger connected to the FCC unit developed holes during extended operation, causing an increased main column pressure that contributed to hydrocarbons flowing to the ESP.

40 CSB · ExxonMobil Torrance Refinery Investigation Report The tubes of the operating heat exchanger were scheduled to be cleaned to remove process buildup and then be visually inspected in September 2013. A block valve that could isolate the heat exchanger from the process, however, would not sufficiently close (Figure 30), and so the heat exchanger cleaning and inspection could not be completed while the unit was operating. ExxonMobil chose to continue operating the fouled heat exchanger until the next scheduled turnaround in June 2015. In its Equipment Strategy document, ExxonMobil personnel previously identified that the heat exchanger tubes could corrode and/or erode and leak naphtha into the slurry oil, but they did not identify that such a leak could have negative safety consequences during Safe Park (Figure 31), and identified only a minor economic consequence (“Consequence IV” in Figure 31 is an internal ExxonMobil financial consequence category). This specific main column pressurization scenario could be difficult to identify—and was not identified by ExxonMobil—in typical hazard analyses. This underscores that ExxonMobil could have best prevented this incident by monitoring operating parameters that could directly verify safeguard availability, and developing a procedure that required corrective action (e.g. unit shutdown) when pre-determined safe operating limits were deviated from to prevent hydrocarbon backflow through the process (Section 5.1).

FIGURE 31 ExxonMobil identified no safety consequence for leaking heat exchanger tubes. “SHE” stands for “Safety, Health, and Environment.” (emphasis added) FIGURE 30 Heat exchanger shell-side path showing isolation block valve that would not close

CSB · ExxonMobil Torrance Refinery Investigation Report 41 FCC UNIT REMAINED IN SAFE PARK AND WAS NOT SHUT DOWN From the time the vibrating expander caused the FCC unit to go into Safe Park until the explosion two days later, the FCC unit remained energized and hydrocarbons continued to circulate within the unit. When ExxonMobil personnel identified the leaking SCSV and the absence of a catalyst barrier, ExxonMobil chose to keep the FCC unit in Safe Park and proceed with working to enter the expander. When refinery personnel saw steam leaking out of the open flange, presenting a hazard to workers, ExxonMobil kept the FCC unit in Safe Park, choosing to reduce the steam flow rate to minimize worker exposure. The ESP remained energized in Safe Park, and the ignition source remained available when the reduction in steam flow rate caused the pressure deviation that allowed hydrocarbons to backflow through the process and reach the ESP. The CSB identified four main reasons ExxonMobil continued to operate in Safe Park when personnel identified the SCSV had not developed a catalyst barrier: (1) It is faster to start the FCC unit up from Safe Park than from a complete shutdown, meaning production can begin again sooner; (2) ExxonMobil believed that completely shutting down the FCC unit was a non-routine, non-steady state operation that could introduce greater hazards to refinery personnel; (3) ExxonMobil personnel did not conduct an analysis to identify the safety consequences of relying on the single steam safeguard after they became aware that the SCSV safeguard failed; and (4) ExxonMobil did not have a Safe Park procedure that required unit shut down if a safety-critical safeguard, such as a specific catalyst level above the closed SCSV, was not established. The CSB concludes that ExxonMobil personnel were likely not focusing on how the failure of the SCSV safeguard affected the overall safety of the unit. Rather, refinery personnel were primarily focusing on accessing the expander and restarting the unit.

Leading to the incident, there were indications that the FCC unit was in an unsafe state, but due to, among other things, a lack of effective safeguard analyses, ExxonMobil never shut down the unit. This section discusses the missed opportunities to identify the potential for an ESP explosion.

42 CSB · ExxonMobil Torrance Refinery Investigation Report EXXONMOBIL OPENED PROCESS EQUIPMENT NOT IN CONFORMANCE WITH REFINERY STANDARDS ExxonMobil was motivated to perform maintenance on the expander while the unit was in Safe Park, but the piping around the expander was not designed to allow the expander to be safely isolated.53 ExxonMobil management, however, chose to isolate the expander, described below, using unreliable and unsafe isolation methods. On the day of the incident, ExxonMobil opened the expander outlet flange so that a blind could be inserted to isolate the expander from the process for a confined space entry operation. ExxonMobil corporate policies require double block and bleed to isolate equipment prior to installing a blind, but also allow single block and bleed (which is detailed in the “Lock Out Tag Out Procedure”) if that is the only option (Figure 32).

The Lock Out Tag Out Procedure states the following (Figure 33):

53 ExxonMobil could have installed a blind between the main column and the reactor (a common industry term for this blind is the “big blind”). Installing this blind could have prevented hydrocarbons from backflowing through the process and reaching the ESP. Some refineries use a slide valve in place of or in addition to the big blind. FIGURE 32 Excerpt from ExxonMobil Torrance Refinery equipment opening and safe blinding procedure (emphasis added) The expander outlet could not be isolated in conformance to ExxonMobil Torrance refinery safety policies while the FCC unit was in Safe Park. As a result, ExxonMobil did not follow refinery safety policies when attempting to blind the expander outlet.

CSB · ExxonMobil Torrance Refinery Investigation Report 43 The piping leading to the expander outlet flange was not designed to allow double block and bleeding. The maintenance bypass valve shown in Figure 34 could not be used to isolate the expander from the process because it had a hole designed into it for overpressure protection purposes.54 ExxonMobil, therefore, had to perform a single block and bleed to isolate the expander from the process. The only valves available to isolate the expander outlet from process fluids (steam and hydrocarbons) were the SCSV and RCSV. These valves, however, are control valves that throttle the flow of catalyst. ExxonMobil does not consider control valves to be energy isolation devices that can be used to isolate equipment for opening (Figure 33). Control valves typically should not be used as block valves because fluid flow through a partially open control valve can cause damage to the valve that can limit its ability to fully seal. The site therefore did not comply with refinery standards when attempting to insert the blind into the expander outlet. If ExxonMobil management had adhered to the Lock Out Tag Out procedure, they would not have been able to use the SCSV and RCSV to isolate the expander from process fluids, and the expander outlet flange would not have been able to be opened while the unit was in Safe Park. Alternatively, ExxonMobil could have developed a Variance to depart from the typical safety practice and conducted a detailed hazard evaluation to evaluate the safety of the proposed isolation strategy. ExxonMobil did not, however, develop a Variance for this operation. In this instance, opening the expander outlet flange led to the decision to reduce reactor steam flow, which led to the ESP explosion.

54 The bypass valves are control valves used to control the pressure downstream of the regenerator. The hole designed into the Maintenance Bypass valve prevents possible overpressure of the regenerator. FIGURE 33 Excerpt from ExxonMobil Torrance Refinery Lock Out Tag Out procedure (emphasis added) KEY LESSON

Control valves typically should not be used as block valves because fluid flow through a partially open control valve can cause damage to the valve that can limit its ability to fully seal.

44 CSB · ExxonMobil Torrance Refinery Investigation Report

ESP REMAINED ENERGIZED WHEN HYDROCARBONS ENTERED FLUE GAS SYSTEM The ESP generates sparks during normal operation. ExxonMobil corporate design practices therefore require ESPs to be shut down when a flammable gas mixture might enter them (Figure 35). On the day of the incident, however, the Torrance refinery ESP was not shut down when hydrocarbons flowed toward and entered the energized ESP. As a result, sparks within the operating ESP ignited the flammable mixture, resulting in the explosion. This section discusses CSB findings of why the ESP was not automatically shut down when hydrocarbons entered the flue gas piping leading to the ESP. FIGURE 34 Configuration used to isolate expander outlet for blinding ExxonMobil hazard analyses did not sufficiently address the risk of hydrocarbon backflow to the ESP. This oversight resulted in an FCC unit design that could not detect all possible flammable gases flowing toward the ESP. This section discusses the ignition of hydrocarbons in the ESP at the ExxonMobil refinery.

CSB · ExxonMobil Torrance Refinery Investigation Report 45

  1. 8.1 HYDROCARBONS IN FLUE GAS PIPING DID NOT TRIGGER ESP SHUTDOWN

The ExxonMobil Torrance refinery installed a new ESP into the FCC unit in 2009 to meet new environmental regulations.55 The refinery contracted an engineering services firm to design and construct the new ESP. The engineering services firm performed a Process Hazard Analysis (PHA) on the design in November 2006. The PHA identified that flammable vapors could reach the ESP, potentially causing a fire or explosion (Figure 36).

55 SCAQMD, "Rule 1105.1, Reduction of PM10 and Ammonia Emissions from Fluid Catalytic Cracking Units," 07 November

  1. [Online]. Available: http://www.aqmd.gov/docs/default-source/rule-book/reg-xi/rule-1105-1.pdf?sfvrsn=4. [Accessed 07

March 2017]. FIGURE 35 ExxonMobil corporate design practices require ESPs to be shut down when an explosive mixture might enter them. (emphasis added) FIGURE 36 PHA performed in 2006 identified flammable vapor could reach ESP. PHA recommended installing sensors to detect flammable vapor and to initiate shut down of ESP. (emphasis added)

46 CSB · ExxonMobil Torrance Refinery Investigation Report In its 2006 PHA, however, the company did not identify specific scenarios that could cause the generically termed “flammable vapors” to reach the ESP. ExxonMobil resolved the action item by installing carbon monoxide (CO) analyzers in the flue gas system to detect combustible gases flowing into the ESP. Carbon monoxide is a flammable gas that can be generated by incomplete combustion of hydrocarbons within the FCC unit. ExxonMobil chose to install CO analyzers to detect flammable vapors because ExxonMobil personnel believed any hydrocarbon vapors within the flue gas system would be accompanied by carbon monoxide. ExxonMobil personnel believed hydrocarbons would partially combust in the FCC unit, producing CO (Figure 37). The 2006 PHA, the action item resolution team, and the subsequent PHAs performed in 2009 and 2014, did not consider the scenario of hydrocarbons entering the flue gas piping while the unit was in Safe Park, when heat is not available to initiate the combustion reaction that produces CO. On the day of the incident, while the unit was in Safe Park, hydrocarbons entered the flue gas system without the presence of CO. With no analyzer for hydrocarbons, the flammable atmosphere could not be detected. As a result, the energized ESP ignited the hydrocarbons and caused an explosion. The Torrance refinery designed the ESP to remain energized during Safe Park in order to comply with environmental regulations requiring removal of catalyst fines from discharge gases released to the atmosphere.56

56SCAQMD, "Rule 1105.1, Reduction of PM10 and Ammonia Emissions from Fluid Catalytic Cracking Units," 07 November

  1. [Online]. Available: http://www.aqmd.gov/docs/default-source/rule-book/reg-xi/rule-1105-1.pdf?sfvrsn=4. [Accessed 07

March 2017]. FIGURE 37 ExxonMobil Torrance Refinery personnel determined that any flammable hydrocarbons entering the ESP would be accompanied by carbon monoxide (CO) due to partial combustion in the regenerator. (emphasis added)

CSB · ExxonMobil Torrance Refinery Investigation Report 47 5.8.2 PREVIOUS ESP HYDROCARBON EXPLOSIONS The CSB is aware of at least two other incidents similar to the 2015 ExxonMobil Torrance incident where hydrocarbons mixed with air, resulting in an ESP explosion:

  1. On October 28, 1994, an explosion occurred at the Conoco Lake Charles

Refinery in Westlake, Louisiana.57 Similar to the ExxonMobil incident, hydrocarbons from the FCC unit main column entered the air side of the FCC unit. The hydrocarbon source was SNG (sweet natural gas) that was being used to maintain pressure on the main column. The hydrocarbons mixed with air and ignited, causing an explosion that ruptured the ESP. One person was killed and nine were injured.

Refinery ESP. During a unit upset, refinery personnel fed hydrocarbons58 to the regenerator to maintain the regenerator temperature to allow for a more efficient re-start of the FCC unit. At the time, however, the main air blower was not operating at full capacity, and the hydrocarbons did not fully combust inside of the hot regenerator. Unburned hydrocarbons traveled to the ESP, where they mixed with purge air also flowing into the ESP. The ESP ignited the mixture, causing an explosion. No injuries were reported. 5.8.3 OPPORTUNITIES FOR SAFER DESIGN The 2015 ExxonMobil incident, as well as previous FCC unit incidents in the refining industry, show that hydrocarbons can and have ignited in refinery ESPs. CO analyzers may not be sufficient to identify all potential flammable gases in flue gas piping leading to an ESP; hydrocarbons may enter flue gas piping without CO also being present. Following the February 18, 2015 incident, based upon information obtained by ExxonMobil, TORC personnel communicated to the CSB that it was TORC’s understanding that hydrocarbon detectors could not adequately function at the very high temperatures typical in the flue gas piping. This reasoning could have contributed to the decision by ExxonMobil to install only CO analyzers to detect flammable vapors in the flue gas piping because CO analyzers may be able to operate at a higher temperature than hydrocarbon detectors. To prevent ESP

57 AP News Archive, "Explosion Rocks Refinery, Killing a Worker," 28 October 1994. [Online]. Available: http://www.apnewsarchive.com/1994/Explosion-Rocks-Refinery-Killing-a-Worker/id-85c44b8bc43388a815cf474c5ffdbce7. [Accessed 07 March 2017]. 58 The hydrocarbons mentioned here were torch oil. KEY LESSON

Uncombusted hydrocarbons that are not accompanied by carbon monoxide have the potential to reach FCC unit electrostatic precipitators (ESPs). Refining companies should evaluate their FCC units to determine whether there are sufficient safeguards to prevent an ESP hydrocarbon explosion.

48 CSB · ExxonMobil Torrance Refinery Investigation Report explosions, it may be essential to be able to detect hydrocarbons—not in the presence of CO—in the flue gas system leading to ESPs. The inability to detect hydrocarbons in FCC unit flue gas systems may be an industry- wide process safety design weakness. In addition, it is not clear for how long after an ESP shuts down it continues to spark, creating potential ignition sources. The CSB identified industry references that indicate an ESP may continue to contain ignition sources for hours after they are shut down. An alternative design could possibly include an emergency ESP bypass or an emergency grounding system to prevent ignition in the ESP. At the time of the incident, once a flammable gas entered the flue gas system, the only path it could follow routed it to the ESP. Furthermore, because the ESP is known within the refining industry to cause explosions, a potentially safer design could incorporate, for example, explosion relief panels to control where an explosion is vented. This design could help ensure that debris is directed away from hazardous areas, such as the MHF alkylation unit. Alternatively, the use of a wet gas scrubber instead of an ESP may achieve the required emissions control while reducing or eliminating possible ignition sources.

CSB · ExxonMobil Torrance Refinery Investigation Report 49 6.0 CAUSAL ANALYSIS OF MODIFIED HF ALKYLATION UNIT NEAR MISS Following the ESP explosion, a portion of the ESP fell to the ground. A large fragment struck scaffolding59 surrounding the MHF alkylation unit.60 This scaffolding was located within a few feet of the alkylation unit’s settler tanks61 (Figure 38), each containing hydrofluoric acid (HF), water, hydrocarbons, and a chemical additive intended to reduce the amount of HF vaporized during a loss of containment event.62 Discussed previously, the CSB has issued subpoenas for safety information pertaining to the potential release of HF in the event the tanks were struck by explosion debris, and is pursuing enforcement of the subpoenas in US Federal district court.63

59 The scaffolding was temporarily in place for work being done on the alkylation unit. 60 Alkylation is the reaction of propylene or butylene with isobutane, in the presence of a catalyst such as HF, to create an isoparaffin called alkylate, which is used as a blending agent in high octane gasoline. 61 The settler tanks separate hydrocarbons from the acid in the MHF alkylation unit. 62 ExxonMobil had installed multiple mitigation systems to control a release of HF, but has not provided the CSB with documentation to explain those control systems. Therefore, the CSB could not analyze whether the safeguards could prevent a potential release of HF outside of the refinery property. 63 ExxonMobil has not provided this information to the CSB because they have stated that the requested documents are not within the CSB’s jurisdiction in investigating the causes of the February 18, 2015 incident. FIGURE 38 Damage to scaffolding surrounding the MHF alkylation unit’s settler tanks. The alkylation unit produces hydrocarbons used as a blending component to increase the octane rating of gasoline.

50 CSB · ExxonMobil Torrance Refinery Investigation Report ESP SITING The ESP was installed in the FCC unit in 2009, to comply with new environmental regulations.64 ExxonMobil constructed the ESP adjacent to the FCC unit and in close proximity to other units (Figure 39). For example, the distance from the ESP to the alkylation unit is approximately 80 feet. From the ESP to the Pretreater Unit65 is less than 50 feet. And from the ESP to the Demineralization Unit, located directly south of the ESP, is also less than 50 feet away. ExxonMobil constructed the ESP in its chosen location because there were “no feasible alternative ESP sites.” Specifically, given the refinery’s “limited space and logistical constraints,” other sites were “deemed infeasible.”66 It was found that “the new ESPs must be located adjacent to the existing FCC [unit].”67 Constructing the ESP further away from the FCC “would require additional duct work, more blowers, more support facilities, increased energy use (to accommodate any potential pressure drops), and more extensive construction activities . . . .”68

  1. 1.1 PREVENTING CONSEQUENCES OF AN ESP EXPLOSION

ExxonMobil addresses process unit siting hazards by conducting risk assessments based upon prescriptive spacing requirements for specific processes and materials. For the ESP siting, however, ExxonMobil only conducted these risk assessments for units within 50 feet of the intended ESP location. Because the new ESP was located within 50 feet of the pretreater unit and the power distribution center, ExxonMobil analyzed siting hazards associated with the close proximity. ExxonMobil performed no analysis for the siting of the ESP relative to the alkylation unit, however, because the alkylation unit was more than 50 feet away. The ESP was constructed in close proximity to settler tanks containing, among other substances, HF which is a highly toxic chemical. The CSB notes that ESPs have historically caused explosions in the refining industry. Two of these incidents are discussed in Section 5.8.2, but the CSB is aware that additional ESP explosions have occurred.

64 SCAQMD, "Rule 1105.1, Reduction of PM10 and Ammonia Emissions from Fluid Catalytic Cracking Units," 07 November 2003. [Online]. Available: http://www.aqmd.gov/docs/default-source/rule-book/reg-xi/rule-1105- 1.pdf?sfvrsn=4. [Accessed 07 March 2017]. 65 The pretreater unit removes unwanted chemical components from the hydrocarbon feed prior to it being sent to various units for further processing. 66 SCAQMD, "Final Environmental Impact Report for the ExxonMobil Torrance Refinery Rule 1105.1 Compliance Project," March 2007. [Online]. Available: http://www.aqmd.gov/docs/default-source/ceqa/documents/permit- projects/2007/exxon/feir.pdf?sfvrsn=2. [Accessed 07 March 2017]. 67 Id. 68 Id. FIGURE 39 Overhead view of a portion of the Torrance refinery

CSB · ExxonMobil Torrance Refinery Investigation Report 51 The siting of equipment that is known within the industry to cause explosions ideally should have required a risk assessment. Because the HF settler tanks were more than 50 feet away, however, ExxonMobil did not perform a risk analysis of the ESP proposed location relative to the HF settler tanks. Regulatory oversight of unit siting is addressed by Cal/OSHA69 through its PSM standard70 and also by the Environmental Protection Agency through its RMP standard.71 In addition to the current PSM regulation, Cal/OSHA is seeking to draft improvements to its PSM standard.72 The current proposed draft requires that companies address in their PHAs ”[f]acility siting, including the placement of processes, equipment, buildings, employee occupancies and work stations, in order to effectively protect employees from process safety hazards.”73,74 In addition to the Cal/OSHA proposed PSM standard siting requirements, the CSB recommends that ExxonMobil and TORC perform a siting risk analysis of the ExxonMobil and Torrance refinery ESPs, respectively, and implement appropriate safeguards to minimize the consequences of an ESP explosion.

69 Cal/OSHA develops and administers job safety and health programs for workers in California. Cal/OSHA is the state OSHA program for California. 70 8 CCR § 5189. Process Safety Management of Acutely Hazardous Materials [Online]. Available: https://www.dir.ca.gov/title8/5189.html. [Accessed 07 March 2017]. 71 40 CFR § 68.67 Chemical Accident Prevention Provisions. 72 State of California Department of Industrial Relations, "DIR and the Governor's Interagency Refinery Task Force," [Online]. Available: http://www.dir.ca.gov/dosh/interagency-refinery-task-force.html. [Accessed 07 March 2017]. 73 "Standards Presentation to California Occupational Safety and Health Standards Board," [Online]. Available: http://www.dir.ca.gov/OSHSB/documents/Process-Safety-Management-for-Petroleum-Refineriess-proptxt.pdf. [Accessed 07 March 2017]. 74 The California Accidental Release Prevention (CalARP) Program also requires that PHAs address “[s]tationary source siting.” 19 CCR § 2760.2(c)(5) [Online]. Available: http://www.caloes.ca.gov/FireRescueSite/Documents/CalARP%20Regulations%2001012015.pdf. [Accessed 07 March 2017].

52 CSB · ExxonMobil Torrance Refinery Investigation Report 7.0 ADDITIONAL TORRANCE REFINERY INCIDENTS Since the February 18, 2015 ESP explosion, the Torrance refinery has experienced multiple incidents under both ExxonMobil and PBF ownership. The incidents75 that have occurred since the ESP explosion include: • September 6, 2015—A leak from a clamped pipe in the alkylation unit caused a hydrofluoric acid release. The release did not result in any injuries or off-site consequences, but because the leaking clamp was connected to a vessel containing thousands of pounds of hydrofluoric acid. • November 15, 2016—A fire occurred while work was being conducted on a portion of the refinery flare system in the alkylation unit. • February 1, 2017—A fire occurred in the Torrance refinery tank farm. • February 18, 2017—A pump-related fire occurred in the crude unit. In previous investigations, such as the Chevron Richmond refinery investigation76 and the Williams Geismar Olefins plant investigation,77 the CSB recommended the implementation of continual improvement programs to improve process safety culture. The CSB encourages TORC to implement a process safety culture continual improvement program at the Torrance refinery.78 Such a program may help prevent process safety incidents at the refinery.

75 Due to the limited scope of the CSB’s investigation into these incidents, the CSB is not issuing formal recommendation(s) to PBF or ExxonMobil based upon these incidents. 76 U.S. Chemical Safety and Hazard Investigation Board, "Final Investigation Report - Chevron Richmond Refinery Pipe Rupture and Fire," 2015. [Online]. Available: http://www.csb.gov/file.aspx?DocumentId=666. [Accessed 07 March 2017]. See recommendations 2012-03-I-CA-R36 and 2012-03-I-CA-R37. 77 U.S. Chemical Safety and Hazard Investigation Board, "Williams Geismar Olefins Plant Reboiler Rupture and Fire," October 2016. [Online]. Available: http://www.csb.gov/file.aspx?DocumentId=753. [Accessed 07 March 2017]. See recommendation 2013-03-I-LA-R1. 78 California drafted a proposed process safety management regulation for petroleum refineries, which includes a requirement to “develop, implement and maintain an effective [Process Safety Culture Assessment] program.” See "Standards Presentation to California Occupational Safety and Health Standards Board," [Online]. Available: http://www.dir.ca.gov/OSHSB/documents/Process-Safety-Management-for-Petroleum-Refineriess-proptxt.pdf. [Accessed 07 March 2017].

CSB · ExxonMobil Torrance Refinery Investigation Report 53 8.0 CALIFORNIA PSM REFORM In its Chevron Richmond Refinery interim79 and regulatory80 reports, the CSB issued recommendations to the State of California to enhance its process safety management regulations for petroleum refineries. Since the August 6, 2012 Chevron incident, California has made significant progress in developing new, proposed regulations in its effort to “advance the safety, health and environmental performance of the state’s refinery sector through prevention, emergency preparedness, and community engagement.”81 In July 2016, the California Department of Industrial Relations published a draft of its proposed “Process Safety Management for Petroleum Refineries” regulation.82 The draft regulation proposes requirements that could help to prevent causal factors that led to the February 2015 ExxonMobil incident. DAMAGE MECHANISM REVIEW The draft regulation proposes the requirement for refineries to conduct Damage Mechanism Reviews (DMRs). The draft regulation states “[t]he DMR for each process shall include […] [i]dentification of all potential damage mechanisms, pursuant to subsection (k)(9).” Section (k)(9) includes “[e]rosion, such as abrasive wear, adhesive wear and fretting” as damage mechanisms to be analyzed. The draft regulation also proposes that “[t]he PHA shall address […] DMR reports that are applicable to the process units ….”83 A regulatory requirement to perform DMRs and analyze them during PHAs could facilitate refining companies to identify the potential consequences of equipment degradation (e.g. erosion of the ExxonMobil SCSV) and the effects of that degradation during all modes of operation (e.g. Safe Park). EMPLOYEE PARTICIPATION The draft California PSM regulation for refineries proposes new requirements to increase the participation of operations personnel in process safety management. The draft regulation states “the employer shall develop, implement and maintain a written plan to effectively provide for employee participation in all PSM elements” which includes: Effective participation by affected operating and maintenance employees and employee representatives, at the earliest possible point, in performing PHAs, DMRs, [Hierarchy of Hazard Controls Analyses], [Management of Change], Management of Organizational Change (MOOCs), Process Safety Culture Assessments (PSCAs), Incident Investigations, [Safeguard Protection Analyses], and [Pre-Startup Safety Reviews].84

79 U.S. Chemical Safety and Hazard Investigation Board, "Interim Investigation Report - Chevron Richmond Refinery Fire," [Online]. Available: http://www.csb.gov/file.aspx?DocumentId=662. [Accessed 07 March 2017]. 80 U.S. Chemical Safety and Hazard Investigation Board, "Regulatory Report - Chevron Richmond Refinery Pipe Rupture and Fire," October 2014. [Online]. Available: http://www.csb.gov/file.aspx?DocumentId=661. [Accessed 07 March 2017]. 81 State of California Department of Industrial Relations, "DIR and the Governor's Interagency Refinery Task Force," [Online]. Available: http://www.dir.ca.gov/dosh/interagency-refinery-task-force.html. [Accessed 07 March 2017]. 82 "Standards Presentation to California Occupational Safety and Health Standards Board," [Online]. Available: http://www.dir.ca.gov/OSHSB/documents/Process-Safety-Management-for-Petroleum-Refineriess-proptxt.pdf. [Accessed 07 March 2017]. 83 Id. 84 Id.

54 CSB · ExxonMobil Torrance Refinery Investigation Report This proposed regulation change could require refining companies to include additional knowledgeable personnel in changes to safety procedures (e.g. ExxonMobil’s Variance, a type of MOC), which could help include a broader knowledge base when specifying operational safeguards (e.g. riser steam flow rate). SAFEGUARD PROTECTION ANALYSIS The draft regulation also proposes enhanced Safeguard Protection Analyses—tools to assess the effectiveness of safeguards. The draft regulation states: For each scenario in the PHA that identifies the potential for a major incident, the employer shall perform an effective written [safeguard protection analysis] to determine the effectiveness of existing individual safeguards, the combined effectiveness of all existing safeguards for each failure scenario in the PHA, the individual and combined effectiveness of safeguards recommended in the PHA, and the individual and combined effectiveness of additional or alternative safeguards that may be needed.85 The draft regulation proposes using a tool such as Layer of Protection Analysis (LOPA) to “identify the most protective safeguards.”86 This proposed regulatory change could help refining companies to focus on determining the quality and effectiveness of critical safeguards (e.g. SCSV catalyst accumulation and steam flow) to prevent a major process safety incident. CONCLUSIONS The CSB views the modernization of United States process safety management regulations as one of the most important chemical safety improvement goals.87 In previous investigation reports,88 the CSB has issued safety recommendations with the goal of improving process safety management regulations at Federal, state, and local levels, to help prevent catastrophic industrial accidents.89 The CSB supports the effort to improve process safety management of California refineries. The CSB encourages California to fully implement the recommendations issued as a result of the CSB Chevron Richmond refinery investigation.90

85 "Standards Presentation to California Occupational Safety and Health Standards Board," [Online]. Available: http://www.dir.ca.gov/OSHSB/documents/Process-Safety-Management-for-Petroleum-Refineriess-proptxt.pdf. [Accessed 07 March 2017]. 86 Id. 87 U.S. Chemical Safety and Hazard Investigation Board, "Drivers of Critical Chemical Safety Change," [Online]. Available: http://www.csb.gov/drivers-of-critical-chemical-safety-change/. [Accessed 07 March 2017]. 88 See CSB investigation reports on the Chevron Refinery Fire, Tesoro Refinery Fatal Explosion and Fire, Motiva Enterprises Sulfuric Acid Tank Explosion, BP Texas City Explosion, Improving Reactive Hazard Management report, Donaldson Enterprises, Inc. Fatal Fireworks Disassembly Explosion and Fire, and the West Fertilizer Explosion and Fire. See U.S. Chemical Safety and Hazard Investigation Board, "Process Safety Management Investigations - Investigations with findings related to modernization of process safety management," [Online]. Available: http://www.csb.gov/recommendations/process- safety-management-investigations/. [Accessed 07 March 2017]. 89 For a full list of the CSB recommendations for PSM modernization, see U.S. Chemical Safety and Hazard Investigation Board, "PSM Recommendations - Open Recommendations for PSM modernization," [Online]. Available: http://www.csb.gov/recommendations/psm-recommendations/. [Accessed 07 March 2017]. 90 U.S. Chemical Safety and Hazard Investigation Board, "Chevron Refinery Fire," [Online]. Available: http://www.csb.gov/chevron-refinery-fire/. [Accessed 07 March 2017].

CSB · ExxonMobil Torrance Refinery Investigation Report 55 9.0 KEY LESSONS 1. It is essential to identify and define safe operating limits for all modes of operation, and measure process conditions and parameters that can verify the operation of the process relative to those safe operating limits. When a facility relies on operating parameters that only indirectly provide information on critical process parameters, it can lead to the inability to identify when a process is in an unsafe condition.

When implementing a deviation from an existing procedure, it is critical that the company conduct a management of change to—among other requirements—verify and authorize the technical basis, the implementation time period, and identify any new or affected hazards and associated mitigation strategies. If the procedure deviation is saved for future use, before implementing the procedure the company should verify that the underlying conditions, activities, and technical assumptions that were the basis for the initial authorization are in place and are still valid.

It is essential to schedule and perform maintenance of safety-critical equipment so that the equipment is available to perform its safety-critical function.

It is important to consider all modes of operation—including non-routine operations such as unit standby— when performing process hazard analyses. Incident scenarios could be possible during non-routine modes of operation that may not have been considered when analyzing process hazards for normal, continuous operation.

Companies should develop operating procedures for all modes of operation—including unit standby—that detail safe operating limits, consequences of deviating from those limits, and specified actions to implement in the event the process deviates outside of its safe operating limits.

Robust management of change practices are needed when making changes to procedures. Similar to PHAs, conducting management of change as a multidisciplinary group—composed of individuals with different areas of expertise—can assist in identifying hazards introduced by the procedure change.

Control valves typically should not be used as block valves because fluid flow through a partially open control valve can cause damage to the valve that can limit its ability to fully seal.

Uncombusted hydrocarbons that are not accompanied by carbon monoxide have the potential to reach FCC unit electrostatic precipitators (ESPs). Refining companies should evaluate their FCC units to determine whether there are sufficient safeguards to prevent an ESP hydrocarbon explosion.

56 CSB · ExxonMobil Torrance Refinery Investigation Report 10.0 CONCLUSIONS This incident was preventable; weaknesses in the ExxonMobil Torrance refinery’s process safety management program led to a hydrocarbon backflow in the FCC unit and ignition in the ESP. ExxonMobil did not develop a procedure specifically for operating in Safe Park that established safe operating limits and the process conditions that required unit shutdown. In addition, ExxonMobil did not adequately define the function of its safety-critical equipment while in Safe Park, and did not ensure the safety-critical equipment could perform its safety-critical function. ExxonMobil also did not sufficiently perform risk analyses to identify the adequacy of its Safe Park safeguards. Effective safeguards were not established to prevent the incident. At the Chevron Richmond refinery, piping material of construction and relied-upon inspection techniques did not prevent pipe failure from sulfidation corrosion.91 The CSB identified several process safety design weaknesses in the Torrance refinery FCC unit at the time of the February 18, 2015 incident. The piping and equipment between the regenerator and ESP were not configured with instrumentation to detect hydrocarbons (not in the presence of carbon monoxide) flowing toward the ESP. Due to possible temperature limitations of hydrocarbon detection instrumentation, this may be an industry-wide problem. As demonstrated by this incident and previous incidents described in this report, hydrocarbons can and have accumulated and ignited in FCC unit ESPs. The inability to detect hydrocarbons in piping and equipment leading to a potential, unintended ignition source (i.e. an ESP) may be a process safety deficiency. In addition, the spent catalyst slide valve could not reliably isolate the hydrocarbon side and air side of the FCC unit from one another. ExxonMobil relied on the SCSV as a safety-critical block valve while in Safe Park, but the SCSV was designed to be a control valve and could not adequately seal. Other refineries may be using SCSVs in this way, which may be beyond their design intent. The CSB calls on refining companies to analyze the causal factors, key lessons, and recommendations from this incident, and look for opportunities to prevent a similar incident at their own facilities.

91 U.S. Chemical Safety and Hazard Investigation Board, "Final Investigation Report - Chevron Richmond Refinery Pipe Rupture and Fire," 2015. [Online]. Available: http://www.csb.gov/file.aspx?DocumentId=666. [Accessed 07 March 2017].

CSB · ExxonMobil Torrance Refinery Investigation Report 57 11.0 RECOMMENDATIONS EXXONMOBIL CORPORATION 2015-02-I-CA-R1 A Variance to a safety policy or procedure requires robust analysis of the proposed safeguards prior to its approval and implementation. To ensure the proposed methodology described in the Variance is safe and the proposed safeguards are sufficiently robust, revise corporate and U.S. refinery standard(s) to require that a multidisciplinary team reviews the Variance before it is routed to management for their approval. Include knowledgeable personnel on the Variance multidisciplinary team such as: (1) the developer of the Variance; (2) a technical process representative (e.g. process engineer for the applicable unit); (3) an hourly operations representative (e.g. experienced operator in the applicable unit); and (4) a health and safety representative. The role of the multidisciplinary team is to formally meet to review, discuss, and analyze the proposed Variance, and adjust the safety measures as needed to ensure a safe operation. In the event the expert team members do not come to a consensus that the Variance measures can result in a safe operation, require the proposed work to be routed to a higher management level for final approval.

2015-02-I-CA-R2 ExxonMobil did not have an operating procedure for operating the FCC unit in its Safe Park mode of operation. At all ExxonMobil U.S. refineries, develop a program to ensure operating procedures are written and available for each mode of operation—such as unit standby—for all ExxonMobil U.S. refinery FCC units. Specify in the program that ExxonMobil U.S. refineries develop and train operators on any new procedure.

2015-02-I-CA-R3 The spent catalyst slide valve, specified as a safety-critical device for normal operation, could not perform its safety-critical function of preventing air and hydrocarbons from mixing while the FCC unit was in its “Safe Park” mode of operation. Also, ExxonMobil Torrance did not operate the FCC unit as if the reactor steam was a safety critical safeguard. Require identification of all safety critical equipment and consequence of failure for each mode of operation and ensure safety critical devices can successfully function when needed. Develop and implement a policy that requires all U.S. ExxonMobil refineries to: (1) specify each safety-critical device’s safety function; (2) identify the consequences of failure of each safety-critical device;

58 CSB · ExxonMobil Torrance Refinery Investigation Report (3) specify the testing strategy used to verify whether the safety-critical device can function as intended to perform its required safety function; and (4) maintain target availability (e.g. safe operating life) for each safety-critical device through inspection and maintenance. Require that items (1) through (4) above consider each mode of operation, including but not limited to normal operation, start up, shut down, and “Safe Park” modes of operation.

2015-02-I-CA-R4 ExxonMobil extended the maintenance interval of the spent catalyst slide valve and the inspection interval of the pumparound heat exchanger without analyzing whether the extended operation lowered their availability (by operating them beyond their predicted safe operating life) and could result in negative safety consequences. In the event safety-critical equipment is operated beyond its inspection and/or maintenance interval (e.g. extended turnaround interval), require all ExxonMobil U.S. refineries to perform a risk evaluation (e.g. MOC or risk assessment) to identify the safety consequences of the extended operation. Require that each mode of operation, including but not limited to normal operation, start up, shut down, and “Safe Park” modes of operation is evaluated during the risk evaluation.

2015-02-I-CA-R5 Electrostatic precipitators create potential ignition sources during normal operation, and have historically caused explosions within the refining industry. At all U.S. ExxonMobil refineries, require a siting risk analysis be performed of all electrostatic precipitators and implement appropriate safeguards to minimize the consequences of an electrostatic precipitator explosion.

CSB · ExxonMobil Torrance Refinery Investigation Report 59 TORRANCE REFINING COMPANY 2015-02-I-CA-R6 Implement protective systems that prevent ignition of flammable gases (including hydrocarbons not in the presence of CO) inside of the electrostatic precipitator, for each mode of operation.

2015-02-I-CA-R7 The spent catalyst slide valve, specified as a safety-critical device for normal operation, could not perform its safety-critical function of preventing air and hydrocarbons from mixing while the FCC unit was in its “Safe Park” mode of operation. Require identification of all safety critical equipment and consequence of failure for each mode of operation and ensure safety-critical devices can successfully function when needed. Develop and implement a policy that requires the Torrance refinery to: (1) specify each safety-critical device’s safety function; (2) identify the consequences of failure of each safety-critical device; (3) specify the testing strategy used to verify whether the safety-critical device can function as intended to perform its required safety function; and (4) maintain target availability (e.g. safe operating life) for each safety-critical device through inspection and maintenance. Require that items (1) through (4) above consider each mode of operation, including but not limited to normal operation, start up, shut down, and “Safe Park” modes of operation.

2015-02-I-CA-R8 The Torrance refinery extended the maintenance interval of the spent catalyst slide valve and the inspection interval of the pumparound heat exchanger without analyzing whether the extended operation lowered their availability (by operating them beyond their predicted safe operating life) and could result in negative safety consequences. In the event safety critical equipment is operated beyond its inspection and/or maintenance interval (e.g. extended turnaround interval), require the Torrance refinery to perform a risk evaluation (e.g. MOC or risk assessment) to identify the safety consequences of the extended operation. Require that each mode of operation, including but not limited to normal operation, start up, shut down, and “Safe Park” modes of operation is evaluated during the risk evaluation.

2015-02-I-CA-R9 Electrostatic precipitators create potential ignition sources during normal operation, and have historically caused explosions within the refining industry. At the Torrance refinery, require a siting risk analysis be performed of the FCC unit electrostatic precipitator and implement appropriate safeguards to minimize the consequences of an electrostatic precipitator explosion.

60 CSB · ExxonMobil Torrance Refinery Investigation Report

AMERICAN FUEL AND PETROCHEMICAL MANUFACTURERS 2015-02-I-CA-R10 Facilitate forum(s)—attended by fluid catalytic cracking unit engineers and other relevant personnel from American Fuel and Petrochemical Manufacturers member companies—to discuss the causal factors of the February 18, 2015 ExxonMobil Torrance refinery incident. Encourage participants to share topics such as design, maintenance, and procedural practices that can prevent a similar incident. Topics of discussion should include: (1) Detection of hydrocarbons flowing to an ESP; (2) Isolation strategies to prevent mixing of air and hydrocarbons during standby operations; (3) Safe operation during unit standby; (4) Use of SCSVs as a safeguard during standby operations; (5) Use of reactor steam as a safeguard during standby operations; (6) Measuring reactor / main column differential pressure during standby operations; (7) ESP explosion safeguards; and (8) Preventing ESP explosions. Create documentation that creates institutional knowledge of the information discussed in the forum(s), and share with the member companies and forum attendees.

CSB · ExxonMobil Torrance Refinery Investigation Report 61 REFERENCES 19 CCR § 2760.2(c)(5) [Online]. Available: http://www.caloes.ca.gov/FireRescueSite/Documents/CalARP%20Regulations%2001012015.pdf. [Accessed 07 March 2017]. 29 C.F.R. § 1910.119(f). 40 CFR § 68.67 Chemical Accident Prevention Provisions. 8 CCR § 5189. Process Safety Management of Acutely Hazardous Materials [Online]. Available: https://www.dir.ca.gov/title8/5189.html. [Accessed 07 March 2017]. A. Hopkins, Lessons from Longford: The Esso Gas Plant Explosion, CCH Australia, 2000. AP News Archive, "Explosion Rocks Refinery, Killing a Worker," 28 October 1994. [Online]. Available: http://www.apnewsarchive.com/1994/Explosion-Rocks-Refinery-Killing-a-Worker/id- 85c44b8bc43388a815cf474c5ffdbce7. [Accessed 07 March 2017]. ExxonMobil, "ExxonMobil Earns $7.8 Billion in 2016; $1.7 Billion During Fourth Quarter," 31 January 2017. [Online]. Available: http://news.exxonmobil.com/press-release/exxonmobil-earns-78-billion-2016-17-billion- during-fourth-quarter. [Accessed 07 March 2017]. ExxonMobil, "ExxonMobil to Sell Torrance Refinery to PBF Energy," 30 September 2015. [Online]. Available: http://news.exxonmobil.com/press-release/exxonmobil-sell-torrance-refinery-pbf-energy. [Accessed 07 March 2017]. ExxonMobil, "Material Safety Data Sheets, 3139 Naphtha," [Online]. Available: http://www.msds.exxonmobil.com/IntApps/psims/SearchResults.aspx. [Accessed 07 March 2017]. ExxonMobil, "Our history," 2017. [Online]. Available: http://corporate.exxonmobil.com/en/company/about- us/history/overview. [Accessed 7 March 2017]. ExxonMobil, "Our Products," 2017. [Online]. Available: http://www.exxonmobilchemical.com/Chem- English/about/our-products.aspx. [Accessed 07 March 2017]. Glatt, "HP Spray Coating," 2017. [Online]. Available: http://www.glatt.com/en/processes/coating/fluidized- bed-coating/hp-spray/#jfmulticontent_c6020-1. [Accessed 07 March 2017]. Gnerre, Sam. South Bay Daily Breeze, "Capt. John Barneson brings an oil refinery to Torrance," 4 October

  1. [Online]. Available: http://blogs.dailybreeze.com/history/2014/10/04/capt-john-barneson-brings-an-oil-

refinery-to-torrance/. [Accessed 07 March 2017].

62 CSB · ExxonMobil Torrance Refinery Investigation Report J. Rasmussen, "Risk Management in a Dynamic Society: A Modelling Problem," Safety Science, vol. 27, no. 2/3, pp. 183-213, 1997. M. Crawford, Building the Workingman's Paradise - The Design of American Company Towns, London: Verso, 1995. PBF Energy, "PBF Energy Completes Acquisition of the Torrance Refinery and Related Logistics Assets," 01 July 2016. [Online]. Available: http://investors.pbfenergy.com/news/2016/07-01-2016-113123883. [Accessed 07 March 2017]. PBF Energy, "Refineries," 2017. [Online]. Available: http://www.pbfenergy.com/refineries. [Accessed 07 March 2017]. SCAQMD, "Final Environmental Impact Report for the ExxonMobil Torrance Refinery Rule 1105.1 Compliance Project," March 2007. [Online]. Available: http://www.aqmd.gov/docs/default- source/ceqa/documents/permit-projects/2007/exxon/feir.pdf?sfvrsn=2. [Accessed 07 March 2017]. SCAQMD, "Report on ExxonMobil Torrance Refinery Incident of February 18, 2015; SCAQMD Response and Sampling & Analysis Efforts," [Online]. Available: http://www.aqmd.gov/docs/default- source/compliance/exxonmobil-02182015.pdf. [Accessed 07 March 2017]. SCAQMD, "Rule 1105.1, Reduction of PM10 and Ammonia Emissions from Fluid Catalytic Cracking Units," 07 November 2003. [Online]. Available: http://www.aqmd.gov/docs/default-source/rule-book/reg-xi/rule- 1105-1.pdf?sfvrsn=4. [Accessed 07 March 2017]. "Standards Presentation to California Occupational Safety and Health Standards Board," [Online]. Available: http://www.dir.ca.gov/OSHSB/documents/Process-Safety-Management-for-Petroleum-Refineriess-proptxt.pdf. [Accessed 07 March 2017]. State of California Department of Industrial Relations, "DIR and the Governor's Interagency Refinery Task Force," [Online]. Available: http://www.dir.ca.gov/dosh/interagency-refinery-task-force.html. [Accessed 07 March 2017]. State of California, Department of Industrial Relations, "Citation and Notification of Penalty, ExxonMobil Refining & Supply Company," 13 August 2015. [Online]. Available: http://www.dir.ca.gov/dosh/citations/ExxonMobil.Signed-Citation-Documents.1042440.pdf. [Accessed 03 March 2017]. T. Kletz and P. Amyotte, Process Plants-A Handbook for Inherently Safer Design (2nd Edition), Taylor & Francis, 2010.

CSB · ExxonMobil Torrance Refinery Investigation Report 63 The National Institute for Occupational Safety and Health (NIOSH), "NIOSH Pocket Guide to Chemical Hazards, Hydrogen fluoride," 11 April 2016. [Online]. Available: https://www.cdc.gov/niosh/npg/npgd0334.html. [Accessed 27 February 2017]. Torrance Herald, "3 Million Dollar Refinery to Go Up Here Immediately," 4 October 1928. [Online]. Available: http://arch.torranceca.gov/archivednewspapers/Herald/1928%20May%203%20- %201929%20Oct%2031/PDF/00000239.pdf. [Accessed 07 March 2017]. U.S. Chemical Safety and Hazard Investigation Board, "Chevron Refinery Fire," [Online]. Available: http://www.csb.gov/chevron-refinery-fire/. [Accessed 07 March 2017]. U.S. Chemical Safety and Hazard Investigation Board, "Drivers of Critical Chemical Safety Change," [Online]. Available: http://www.csb.gov/drivers-of-critical-chemical-safety-change/. [Accessed 07 March 2017]. U.S. Chemical Safety and Hazard Investigation Board, "Final Investigation Report - Chevron Richmond Refinery Pipe Rupture and Fire," 2015. [Online]. Available: http://www.csb.gov/file.aspx?DocumentId=666. [Accessed 07 March 2017]. U.S. Chemical Safety and Hazard Investigation Board, "Interim Investigation Report - Chevron Richmond Refinery Fire," [Online]. Available: http://www.csb.gov/file.aspx?DocumentId=662. [Accessed 07 March 2017]. U.S. Chemical Safety and Hazard Investigation Board, "Process Safety Management Investigations - Investigations with findings related to modernization of process safety management," [Online]. Available: http://www.csb.gov/recommendations/process-safety-management-investigations/. [Accessed 07 March 2017]. U.S. Chemical Safety and Hazard Investigation Board, "PSM Recommendations - Open Recommendations for PSM modernization," [Online]. Available: http://www.csb.gov/recommendations/psm-recommendations/. [Accessed 07 March 2017]. U.S. Chemical Safety and Hazard Investigation Board, "Regulatory Report - Chevron Richmond Refinery Pipe Rupture and Fire," October 2014. [Online]. Available: http://www.csb.gov/file.aspx?DocumentId=661. [Accessed 07 March 2017]. U.S. Chemical Safety and Hazard Investigation Board, "Transcript from 1.13.2016 Public Meeting (30015_Exxon public meeting pt1)," 13 January 2016. [Online]. Available: http://www.csb.gov/assets/1/19/Public_meeting_transcript.pdf. [Accessed 07 March 2017]. U.S. Chemical Safety and Hazard Investigation Board, "Williams Geismar Olefins Plant Reboiler Rupture and Fire," October 2016. [Online]. Available: http://www.csb.gov/file.aspx?DocumentId=753. [Accessed 07 March 2017].

64 CSB · ExxonMobil Torrance Refinery Investigation Report U.S. Energy Information Administration, "Refinery Capacity Report," June 2016. [Online]. Available: https://www.eia.gov/petroleum/refinerycapacity/refcap16.pdf. [Accessed 07 March 2017]. United States Census Bureau, "QuickFacts, Torrance City, California," 01 July 2016. [Online]. Available: https://www.census.gov/quickfacts/table/PST045215/0680000. [Accessed 07 March 2017].

Appendix A: Comparison between 2012 and 2015 Safe Park DCS Data

CSB · ExxonMobil Torrance Refinery Investigation Report 65 CSB ANALYSIS OF EXXONMOBIL TORRANCE REFINERY DISTRIBUTED CONTROL SYSTEM (DCS) DATA COMPARISON BETWEEN 2012 AND 2015 SAFE PARK DCS DATA

ExxonMobil Torrance, California Investigation

Appendix A: Comparison between 2012 and 2015 Safe Park DCS Data 66 CSB · ExxonMobil Torrance Refinery Investigation Report 1.0 CATALYST LEVEL ABOVE CLOSED SCSV At the Torrance refinery, the level of the fluidized catalyst bed in the reactor is measured, using the two sensors shown in Figure A-1. During normal operation and during Safe Park, the catalyst in the reactor is fluidized by steam fed to the reactor stripping section. The fluidizing steam feed location is also shown in Figure A-1. In both the 2012 and 2015 transitions to Safe Park, when the Spent Catalyst Slide Valve (SCSV) closed, the reactor catalyst level fell below the bottom sensor shown in Figure A-1. In 2012, it took 20 minutes for the catalyst level to fall below the bottom sensor, and in 2015 it took 9 minutes (see Figure A-2). This likely indicates that the fully closed SCSV was leaking both in 2012 and 2015. The leak rate in 2015 was likely faster due to the advanced erosion of the SCSV. Industry experts have informed the CSB that SCSVs may leak, even when the SCSV is new and has not been eroded by catalyst.

FIGURE A-1 Reactor catalyst bed level measurement FIGURE A-2 In both 2012 and 2015, catalyst leaked past closed SCSV when unit entered Safe Park. In 2012, catalyst level fell below level sensors shown in Figure A-1 in 20 minutes. In 2015, catalyst level fell below level sensors shown in Figure A-1 in 9 minutes.

Appendix A: Comparison between 2012 and 2015 Safe Park DCS Data

CSB · ExxonMobil Torrance Refinery Investigation Report 67 Because the level of catalyst between the SCSV and the bottom sensor shown in Figure A-1 cannot be detected below the level instrument’s lower detection limit, the differential pressure indicator shown in Figure A-3 (PDC_Tag 4), which measures the difference in pressure between the SCSV standpipe (above the closed SCSV) and the regenerator, can be used to identify if there is a catalyst level above the closed SCSV. Catalyst can still accumulate above a leaking SCSV. ExxonMobil measured the reactor pressure (P_Tag 2 shown in Figures A-3, A-4, A-5) and regenerator pressure (P_Tag 3 in Figures A-3, A-4, A-5) in addition to the SCSV standpipe/regenerator differential pressure (PDC_Tag 4 in Figures A-3, A-4, A-5). In 2012, the measured SCSV standpipe/regenerator differential pressure (PDC_Tag 4) was approximately 5 psi greater than the calculated pressure difference between the reactor and regenerator (P_Tag 2 minus P_Tag 3) (Figure A-4). In 2012, ExxonMobil engineers compared the PDC_Tag 4 differential pressure indicator reading to the calculated pressure difference between the reactor pressure and the regenerator pressure (P_Tag 2 minus P_Tag 3). They identified the 5 psi pressure difference, and concluded that a catalyst level had developed above the closed SCSV and was exerting 5 psi of pressure, providing a barrier between the reactor and regenerator. In 2015, the measured SCSV standpipe/regenerator differential pressure closely correlated with the calculated pressure difference between the reactor and the regenerator (Figure A-5). This could have served as an indication that a catalyst level had not developed on top of the closed SCSV, meaning that the anticipated catalyst safeguard was not available. ExxonMobil refinery management, however, did not monitor the PDC_Tag 4 differential pressure reading during preparation to enter the expander during the days leading to the incident, and this important information was not analyzed or considered prior to the incident.

FIGURE A-3 SCSV standpipe / regenerator differential pressure instrument used to determine catalyst level above closed SCSV

Appendix A: Comparison between 2012 and 2015 Safe Park DCS Data 68 CSB · ExxonMobil Torrance Refinery Investigation Report

FIGURE A-4 In 2012, measured SCSV standpipe/regenerator differential pressure exceeded calculated reactor/regenerator differential pressure, indicating that catalyst had accumulated above the closed SCSV. FIGURE A-5 In 2015, measured SCSV standpipe/regenerator differential pressure closely matched the calculated reactor/regenerator differential pressure, indicating that catalyst had not accumulated above the closed SCSV.

Appendix A: Comparison between 2012 and 2015 Safe Park DCS Data

CSB · ExxonMobil Torrance Refinery Investigation Report 69 2.0 RISER STEAM FLOW RATE AND MAIN COLUMN / REACTOR PRESSURES During the 2012 Safe Park, the riser steam flow rate was approximately 7,000 pounds per hour. This was a lower flow rate than the riser flow rate on the day of the 2015 incident, which was reduced to approximately 7,500 pounds per hour. The main column overhead pressure was lower in 2012 (~ 4 psig) than the main column overhead pressure leading to the 2015 incident (9-10 psig). This difference in pressure was likely due to the 2015 heat exchanger tube leak that allowed light hydrocarbons to enter the main column. Plant data does not accurately indicate the main column pressure relative to the reactor pressure leading to the incident due to the design and configuration of the main column pressure sensors. As a result, plant personnel would not have been able to identify when reactor pressure reduced below the main column pressure to allow backflow of main column hydrocarbons, based upon the available data.

  1. 0 SUMMARY

The table below (Table A-1) compares the 2012 Safe Park conditions to the 2015 Safe Park conditions. Based upon the distributed control system data, it is not possible to determine whether the reactor pressure was adequately maintained above the main column pressure in 2012. The difference between the 2012 and 2015 operations that is evident in the data is the presence of the catalyst barrier above the closed SCSV. In 2012, the catalyst barrier developed, but in 2015, the catalyst barrier did not develop likely due to erosion of the SCSV. Table A-1. Comparison between 2012 and 2015 Safe Park

2012 Safe Park 2015 Safe Park Riser Steam Flow Rate ~ 7,000 lb/hr ~ 7,500 lb/hr Approximate pressure exerted by accumulated catalyst above closed SCSV (Calculated value) ~ 5 psi ~ 0 psi (No catalyst level) Main Column Overhead Pressure ~ 4 psig ~ 9-10 psig Reactor Pressure ~ 4 psig ~ 9-10 psig

Appendix B: ExxonMobil 2015 Variance 70 CSB · ExxonMobil Torrance Refinery Investigation Report

Appendix B: ExxonMobil 2015 Variance CSB · ExxonMobil Torrance Refinery Investigation Report 71

Appendix C: Acci-Map 72 CSB · ExxonMobil Torrance Refinery Investigation Report

CSB · ExxonMobil Torrance Refinery Investigation Report 73

Members of the U.S. Chemical Safety and Hazard Investigation Board:

Vanessa Allen Sutherland, J.D./M.B.A. Chairperson

Manuel Ehrlich Member

Richard Engler Member

Kristen Kulinowski, Ph.D. Member

FD06483 | 2015_美国_us-ink-fire.pdf

分类:06_境外及港澳台调查报告 | 年份:2015 | 地域: | 严重程度: | 场所: | 起火原因: | 来源格式:pdf

CSB Names Poor Design and Failure to Test Dust Collection System Among Causes of U.S. Ink New Jersey Flash Fire that Burned Seven Workers in 2012; OSHA Again Urged to Issue New Combustible Dust Regulations

East Rutherford, New Jersey, January 15, 2015—The flash fire that burned seven workers, one seriously, at a U.S. Ink plant in New Jersey in 2012 resulted from the accumulation of combustible dust inside a poorly designed dust collection system that had been put into operation only four days before the accident, an investigation by the U.S. Chemical Safety Board (CSB) has found.

In a report released today and scheduled to be presented for board consideration at a CSB public meeting in East Rutherford this evening, the investigation team concludes that the system was so flawed it only took a day to accumulate enough combustible dust and hydrocarbons in the duct work to overheat, ignite spontaneously, cause an explosion in the rooftop dust collector, and send back a fiery flash that enveloped seven workers.

U.S. Ink is a subsidiary of Sun Chemical, a global graphic arts corporation which has some 9,000 employees worldwide. U.S. Ink manufactures black and color-based inks at seven U.S. locations including East Rutherford. A key step in the ink production process is mixing fine particulate solids, such as pigments and binders, with liquid oils in agitated tanks.

CSB Chairperson Rafael Moure-Eraso said, “The findings presented in the CSB report under consideration show that neither U.S. Ink nor its international parent company, Sun Chemical, performed a thorough hazard analysis, study, or testing of the system before it was commissioned in early October 2012. The original design was changed, the original company engineer retired prior to completion of the project, and no testing was done in the days before the operation of the black-ink pre-mixing room production was started up.”

The CSB found that the ductwork conveyed combustible, condensable vapors above each of three tanks in the mixing room, combining with combustible particles of dust of carbon black and Gilsonite used in the production of black ink.

Investigation Supervisor Johnnie Banks said, “The closed system air flow was insufficient to keep dust and sludge from accumulating inside the air ducts. But to make matters worse, the new dust collector design included three vacuuming hoses which were attached to the closed-system ductwork, used to pick up accumulated dust, dirt and other material from the facility’s floor and other level surfaces as a ‘housekeeping’ measure. NEWS RELEASE U.S. CHEMICAL SAFETY BOARD January 15, 2015

1

The addition of these contaminants to the system ductwork doomed it to be plugged within days of startup.”

The report describes a dramatic series of events that took place within minutes on October 9, 2012. About 1 p.m., an operator was loading powdered Gilsonite, a combustible carbon-containing mineral, into the bag dump station near the pre-mixing room when he heard what he called a strange, squealing sound. He checked some gauges in the control room, and as he was leaving he saw a flash fire originating from the bag dump where he had just been working. He left to notify his supervisor. At about that same time, other workers heard a loud thump that shook the building.

In response to the flash from the bag dump station and the thump, workers congregated at the entrance to the pre-mix room. One worker spotted flames coming from one of the tanks. He obtained a fire extinguisher but before he could use it, he saw an orange fireball erupt and advance toward him. He squeezed the handle on the extinguisher as he jumped from some stairs, just as the flames engulfed him and six other employees who were standing in the doorway.

The CSB determined that overheating and spontaneous ignition which likely caused the initial flash fire at the bag dump was followed by ignition of accumulated sludge-like material and powdery dust mixture of Gilsonite and carbon black in the duct work above tank 306. Meantime, the dust collection system, which had not been turned off, continued to move burning material up toward the dust collector on the building’s roof, where a sharp pressure rise indicated an imminent explosion. This was contained by explosion suppression equipment, but the resulting pressure reversed the air flow, back to the pre-mix room, where a second flash fire occurred, engulfing the workers.

Investigation Supervisor Banks said, “The new system was not thoroughly commissioned. There was no confirmation of whether the system would work as configured, missing opportunities to find potential hazards. The design flaws were not revealed until the dust explosion.”

The report’s safety management analysis points to a lack of oversight by company engineers of the work done by installation contractors. The company chose not to perform a process hazard analysis or management of change analysis – required by company policy for the installation of new processing equipment – because it determined it was merely replacing a previous dust collection system in kind. However, the new system in fact was of an entirely different design.

Considering the emergency response following the flash fire and dust collector explosion, CSB Investigators found that while workers had received training in emergency response situations, they did not follow those procedures, because U.S. Ink had not developed and implemented an effective hazard communication and response plan. A fire coordinator was designated to use the public address system to announce a fire and also pull the alarm box. But because the system was not shut down immediately after the first flash fire, he was among the injured and could not perform his duties. 2

The CSB report’s regulatory analysis highlights the need for a national general industry combustible dust standard which the agency has long recommended that OSHA promulgate, putting in on the CSB’s “Most Wanted” list in 2013, following years of urging action as dust explosions continued to occur in industry. The report, if adopted by the board, would reiterate the CSB’s original recommendation to OSHA, and also recommend OSHA broaden the industries it includes in its current National Emphasis Program on mitigating dust hazards, to include printing ink manufacturers.

Chairperson Moure-Eraso said, “Although OSHA’s investigation of this accident deemed it a combustible dust explosion, it did not issue any dust-related citations, doubtless hampered by the fact that there is no comprehensive combustible dust regulatory standard. In U.S. Ink’s case – and thousands of other facilities with combustible dust – an OSHA standard would likely have required compliance with National Fire Protection Association codes that speak directly to such critical factors as dust containment and collection, hazard analysis, testing, ventilation, air flow, and fire suppression.”

The CSB report notes that the volume of air flow and the air velocity in the company’s dust collection system was significantly below industry recommendations – which, in the absence of a federal combustible dust regulation, are essentially voluntary. The report states the ductwork design did not comply in several respects with guidelines set by the American Conference of Governmental Industrial Hygienists (ACGIH) Industrial Ventilation Manual. Nor did the system’s design, the CSB said, comply with the voluntary requirements of NFPA 91, which states: “All ductwork shall be sized to provide the air volume and air velocity necessary to keep the duct interior clean and free of residual material.”

Chairperson Moure-Eraso said, “A national combustible dust standard would include requirements to conform to what are now largely voluntary industry guidelines and would go far in preventing these dust explosions.”

The report cites gaps in New Jersey’s regulatory system, noting the state’s Uniform Construction Code Act has adopted the International Building Code (which references NFPA dust standards) but has also exempted “manufacturing, production and process equipment.” A proposed CSB recommendation to New Jersey’s Department of Community Affairs calls on the regulatory agency to revise the state’s administrative code to remove this exemption so that dust handling equipment would be designed to meet national fire code requirements. The state is also urged to implement training for local code officials as local jurisdictions enforce the code, and to promulgate a regulation that requires all occupancies handling hazardous materials to inform the local enforcement agency of any type of construction or installation of equipment at an industrial or manufacturing facility.

Chairperson Moure-Eraso said, “Events leading to this accident began even before the earliest planning stages, when the company failed to properly oversee the 3

design, construction and testing of a potentially hazardous system. The victims have suffered the consequences. We hope our recommendations are adopted so that these terrifying industrial dust explosion accidents will stop.”

The CSB is an independent federal agency charged with investigating industrial chemical accidents. The agency's board members are appointed by the president and confirmed by the Senate. CSB investigations look into all aspects of chemical accidents, including physical causes such as equipment failure as well as inadequacies in regulations, industry standards, and safety management systems.

The Board does not issue citations or fines but does make safety recommendations to plants, industry organizations, labor groups, and regulatory agencies such as OSHA and EPA. Visit our website, www.csb.gov.

For more information, contact Communications Manager Hillary Cohen, cell 202- 446-8094 or Sandy Gilmour, Public Affairs, cell 202-251-5496.

4

FD06484 | 2016_美国_AirGas_设施_Fatal爆炸-_AirGas_Facility_Fatal_Explosion__最终报告.pdf

分类:06_境外及港澳台调查报告 | 年份:2016 | 地域: | 严重程度: | 场所: | 起火原因:燃气/爆炸 | 来源格式:pdf

CSB • Investigation Report • Airgas • Cantonment, Florida 1 U.S. Chemical Safety and Hazard Investigation Board Investigation Report One Killed Report Number: 2016-04-I-FL Issue Date: February 2017 “The chemical industry has a continuing problem with reactive chemical accidents. This problem is due to the complex nature of chemical reactivity.” “[W]e cannot avoid reactive chemical hazards; however, chemical plant accidents involving reactive hazards are unacceptable. The technology and the management systems do exist to produce these products safely.” — Daniel Crowl

Nitrous Oxide Explosion

Airgas (Air Liquide) Cantonment, Florida August 28, 2016 Key Issues:  Process Safety Management System  Inherently Safer Design  Reactive Hazards  Hazard Analysis  Ineffective Safeguards

CSB • Investigation Report • Airgas • Cantonment, Florida 2

The U.S. Chemical Safety and Hazard Investigation Board (CSB) is an independent Federal agency whose mission is to drive chemical safety change through independent investigations to protect people and the environment. The CSB is a scientific investigative organization; it is not an enforcement or regulatory body. Established by the Clean Air Act Amendments of 1990, the CSB is responsible for determining accident causes, issuing safety recommendations, studying chemical safety issues, and evaluating the effectiveness of other government agencies involved in chemical safety. More information about the CSB is available at www.csb.gov. The CSB makes public its actions and decisions through investigative publications, all of which may include safety recommendations when appropriate. Examples of the types of publications include: CSB Investigation Reports: formal, detailed reports on significant chemical accidents and include key findings, root causes, and safety recommendations. CSB Investigation Digests: plain-language summaries of Investigation Reports. CSB Case Studies: examines fewer issues than a full investigative report, case studies present investigative information from specific accidents and include a discussion of relevant prevention practices. CSB Safety Bulletins: short, general-interest publications that provide new or timely information intended to facilitate the prevention of chemical accidents. CSB Hazard Investigations: broader studies of significant chemical hazards. Safety Videos: high-quality outreach products that result in improved worker and environmental protection. CSB publications can be downloaded at www.csb.gov or obtained by contacting: U.S. Chemical Safety and Hazard Investigation Board Office of Congressional, Public, and Board Affairs 1750 Pennsylvania Ave NW, Suite 910 Washington, DC 20006 (202) 261-7600 No part of the conclusions, findings, or recommendations of the CSB relating to any chemical accident may be admitted as evidence or used in any action or suit for damages. See 42 U.S.C. § 7412(r)(6)(G).

CSB • Investigation Report • Airgas • Cantonment, Florida 3

Dedication

The United States Chemical Safety and Hazard Investigation Board dedicates this report to Jesse Folmar, who was killed by the nitrous oxide explosion at the Airgas (Air Liquide) facility in Cantonment, Florida on August 28, 2016.1

1 See Jesse Folmar Obituary [121].

CSB • Investigation Report • Airgas • Cantonment, Florida 4

Table of Contents Table of Contents .......................................................................................................................................... 4 Acronyms and Abbreviations ....................................................................................................................... 7 I. Executive Summary .............................................................................................................................. 9 II. Background Information ..................................................................................................................... 11 A. Industry and Corporate Overview ................................................................................................... 11 B. Cantonment Nitrous Oxide Manufacturing Plant Overview ........................................................... 12 1. Facility History ........................................................................................................................... 12 2. Process Description ..................................................................................................................... 13 3. Nitrous Oxide Industry Safety Standards .................................................................................... 18 4. Nitrous Oxide Decomposition Reaction ..................................................................................... 18 5. Trailer Loading ........................................................................................................................... 21 6. Safeguards to Prevent Pumps from Causing Explosions ............................................................ 21 C. History of Nitrous Oxide Explosion Incidents ................................................................................ 23 1. 1973 Pratt & Whitney Explosion – West Palm Beach, Florida .................................................. 24 2. 1980 Puritan-Bennett Explosion – Richmond, California .......................................................... 25 3. 1987 Butler-Amerigas Explosion – Reading, Pennsylvania ....................................................... 27 4. 2001 Linde Explosion – Eindhoven, the Netherlands ................................................................. 28 5. 2007 Scaled Composites Explosion – Mojave, California .......................................................... 29 6. 2012 Air Liquide Explosion – Moncada, Spain .......................................................................... 32 7. 2016 Airgas (Air Liquide) Explosion – Cantonment, Florida .................................................... 34 III. The Incident .................................................................................................................................... 35 IV. Technical Analysis .......................................................................................................................... 42 A. Trailer 182 was not loaded, but needed to be loaded ...................................................................... 42 B. Most Likely Incident Scenario ........................................................................................................ 44 C. Ineffective Safeguards..................................................................................................................... 46 1. Flame Arrestors ........................................................................................................................... 46 a) Background ............................................................................................................................. 46 b) Airgas Flame Arrestor ............................................................................................................. 48 c) Special Flame Arrestor Design and Testing Needed .............................................................. 55 2. “Run-Dry” Safety Interlock ........................................................................................................ 56 a) Safety Instrumented Systems and ISA-84 ............................................................................... 57 D. Nitrous Oxide Loading Pump System Design ................................................................................ 59 1. History of Nitrous Oxide Transfer Pumps at Cantonment .......................................................... 60 a) Smith Precision Products ........................................................................................................ 60

CSB • Investigation Report • Airgas • Cantonment, Florida 5 b) Cryostar ................................................................................................................................... 60 c) ACD ........................................................................................................................................ 61 2. Pump Recycle Piping .................................................................................................................. 63 3. Instrumentation to Monitor Pump Performance ......................................................................... 64 4. Mechanical Seal – A Continual Source of Heat.......................................................................... 64 5. Pump Manufacturer Safety Warnings ......................................................................................... 69 6. Pump Cool Down ........................................................................................................................ 70 a) Worker Exposure to Nitrous Oxide ........................................................................................ 71 b) Flexible Connections between Piping and Pump .................................................................... 72 7. Storage Tank Level ..................................................................................................................... 73 8. Cantonment Design did not Incorporate Lessons from 1980 Richmond, California Incident .... 74 9. Critical Equipment and Preventive Maintenance ........................................................................ 75 E. Other Possible Causes ..................................................................................................................... 76 1. Contamination Prevention and Gap in Chemistry Knowledge ................................................... 76 2. Electrical Safety .......................................................................................................................... 81 F. Post-Incident Valve Positions ......................................................................................................... 81 G. Inherently Safer Design and the Hierarchy of Controls .................................................................. 84 1. The Center for Chemical Process Safety (CCPS) ....................................................................... 84 2. Materials of Construction............................................................................................................ 87 3. Explosion Prevention Systems .................................................................................................... 87 4. Deflagration Venting .................................................................................................................. 87 5. Protective Physical Barrier.......................................................................................................... 89 V. Nitrous Oxide Industry Regulatory Analysis ...................................................................................... 90 A. CSB Reactive Hazards Study .......................................................................................................... 90 B. EPA and OSHA .............................................................................................................................. 92 C. FDA................................................................................................................................................. 93 VI. Air Liquide and Airgas Organizational Analysis ............................................................................ 94 A. Air Liquide (Airgas) Knowledge of Nitrous Oxide Decomposition Hazards ................................. 95 B. Gaps in Air Liquide (Airgas) Nitrous Oxide Safety Knowledge .................................................... 95 C. Process Safety Management ........................................................................................................... 96 1. Airgas Process Safety Policy ...................................................................................................... 98 2. Trailer Loading Procedure ........................................................................................................ 100 3. Airgas and Air Liquide Process Hazard Analysis ..................................................................... 101 a) Hazard Analysis Guidance .................................................................................................... 101 b) Lack of Hazard Analysis of Cantonment Process ................................................................. 102 c) Air Liquide Process Hazard Reviews at Richmond and Donora .......................................... 103

CSB • Investigation Report • Airgas • Cantonment, Florida 6

Management of Change ............................................................................................................ 105

Industry Standards .................................................................................................................... 107

Process Safety Information ....................................................................................................... 108

Need for Additional Technical Personnel ................................................................................. 109 a) Relief Device Isolation Not Allowed by Industry Safety Standard ...................................... 110 b) Use of Teflon Gaskets ........................................................................................................... 112 c) Management Oversight ......................................................................................................... 113

Industry Process Safety Management Guidance ....................................................................... 114 a) Guidelines to Implementing Process Safety Management .................................................... 115 b) The Business Case for Process Safety .................................................................................. 116 VII. Industry Safety Management System Standard ............................................................................ 117 A. NTSB Investigation of Enbridge Pipeline Rupture ....................................................................... 118 B. Need for Process Safety Management System Standard .............................................................. 120 VIII. Air Liquide Post-Incident Actions ................................................................................................ 121 IX. Recommendations ......................................................................................................................... 126 A. Air Liquide .................................................................................................................................... 126

Complete Post-Incident Actions and Process Safety Initiatives for Nitrous Oxide Operations 126 B. The Compressed Gas Association (CGA)..................................................................................... 127

Safety Management System for Nitrous Oxide Manufacturing ................................................ 127

Ensure Effective Flame Arrestor Design .................................................................................. 127

Require Pump Run-Dry Safety Interlocks Apply ISA-84 ......................................................... 127 C. Pump Manufacturer – ACD LLC .................................................................................................. 127

Provide effective warning about nitrous oxide decomposition hazards .................................... 127 D. Pump Manufacturer – Cryostar USA LLC ................................................................................... 128

Provide effective warning about nitrous oxide decomposition hazards .................................... 128 X. Causal Analysis ................................................................................................................................. 130 XI. References ..................................................................................................................................... 131 CSB • Investigation Report • Airgas • Cantonment, Florida 7 Acronyms and Abbreviations AGA

American Gas Association ACGIH American Conference of Governmental Industrial Hygienists AIGA

Asia Industrial Gases Association API

American Petroleum Institute API RP American Petroleum Institute Recommended Practice ARA

Accident Risk Assessment – see page 103

CAL/OSHA California Division of Occupational Safety and Health CCPS

Center for Chemical Process Safety CDT

Central Daylight Time CFR

Code of Federal Regulations CGA

Compressed Gas Association CSB

U.S. Chemical Safety and Hazard Investigation Board DOT

U.S. Department of Transportation EIGA

European Industrial Gases Association EPA

U.S. Environmental Protection Agency FDA

U.S. Food and Drug Administration FL

The State of Florida FMEA

Failure Modes and Effects Analysis FTC

U.S. Federal Trade Commission GMP

Good Manufacturing Practice HAZOP Hazard and Operability Study HIRA

Hazard Identification and Risk Analysis IChemE Institution of Chemical Engineers ISA

International Society of Automation ISO

International Organization for Standardization JIMGA Japan Industrial and Medical Gases Association LOPA

Layers of Protection Analysis LLC

Limited Liability Company MAWP Maximum Allowable Working Pressure MOC

Management of Change NIOSH National Institute for Occupational Safety and Health NO

Nitric oxide

NO2

Nitrogen dioxide N2O

Nitrous oxide NFPA

National Fire Protection Association NPSH

Net Positive Suction Head NTSB

U.S. National Transportation Safety Board OSHA

U.S. Department of Labor Occupational Safety and Health Administration PHA

Process Hazard Analysis PHMSA U.S. Pipeline and Hazardous Materials Safety Administration PRD

Pressure Relief Device PSI

Process Safety Information psi

Pounds per Square Inch psia

Pounds per Square Inch Absolute psig

Pounds per Square Inch Gauge PSM

Process Safety Management PSMS

Pipeline Safety Management System (see API RP 1173) PTFE

Polytetrafluoroethylene also known as Teflon RAGAGEP Recognized and Generally Accepted Good Engineering Practice

CSB • Investigation Report • Airgas • Cantonment, Florida 8

RMP

Risk Management Plan Rule SDS

Safety Data Sheet SIS

Safety Instrumented System

SMS

Safety Management System TEFC

Totally Enclosed Fan-Cooled (motor) TFE

Tetrafluoroethylene U.S.

United States of America USA

United States of America USP

U.S. Pharmacopeial Convention

CSB • Investigation Report • Airgas • Cantonment, Florida 9 I. Executive Summary 1. On Sunday, August 28, 2016, at approximately 12:10 pm, a nitrous oxide trailer truck exploded at the Airgas manufacturing facility in Cantonment, Florida. The explosion killed the only Airgas employee present and heavily damaged the facility, halting nitrous oxide manufacturing at Cantonment indefinitely. 2. The U.S. Chemical Safety and Hazard Investigation Board (CSB) determined the most probable immediate cause of the incident was that during initial loading of a trailer truck, a pump heated nitrous oxide above its safe operating limits. Exceeding these critical safety limits appears to have started a nitrous oxide decomposition reaction that propagated from the pump into the trailer truck, causing the explosion. The CSB has documented its causal determination throughout this report based on a review of the evolution of corporate activities related to nitrous oxide production at the Cantonment site and other relevant facilities, a history of nitrous oxide decomposition explosions in the industry, and an analysis of all available physical, documentary, and testimonial evidence. 3. A definitive determination of the event that started the explosive decomposition of nitrous oxide is not possible due to the force of the explosion, the extent of damage to the facility, the minimal available process data, the absence of surviving eyewitnesses, and the lack of safety controls needed to prevent other potential sources of nitrous oxide decomposition. This report examines other theoretical causes of the explosion, including possible contamination of the nitrous oxide and the lack of an electrical bonding and grounding system needed to prevent static electricity, both of which could contribute to or cause nitrous oxide explosions. 4. Federal regulations require many types of chemical facilities that manufacture highly hazardous substances to have process safety management systems in place to protect their workforce and the public. The majority of these specialized rules do not apply to nitrous oxide facilities; specifically, neither the Occupational Safety and Health Administration’s Process Safety Management standards, nor the Environmental Protection Agency’s Risk Management Plan rule apply to the Airgas Cantonment facility. This is true despite the fact that since 1973, the nitrous oxide industry has averaged one major explosion about every seven years. These incidents killed six workers and injured 21 other people. In addition, since 2001 these explosions have occurred more frequently with an average of one explosion every four years during that timeframe. 5. The CSB investigation found that Airgas lacked a safety management system to identify, evaluate, and control nitrous oxide process safety hazards, which led to the explosion. Although not required by Federal regulations, good practice guidance recommends developing and implementing a robust safety management system to manage the hazards relating to manufacturing, transferring, and shipping nitrous oxide. The contributing causes of the explosion that killed the Airgas employee all stemmed from the company’s lack of an effective overall process safety management system. These causes include:  Airgas did not evaluate inherently safer design options that could have eliminated the need for the pump;

CSB • Investigation Report • Airgas • Cantonment, Florida 10

 Airgas never evaluated its process to identify and control process safety hazards;  Airgas did not effectively apply the hierarchy of controls to the safeguards that the company used to prevent a possible nitrous oxide explosion;  Airgas installed equipment that increased the likelihood of an explosion without performing a management of change safety review;  Airgas did not apply an essential industry safety instrumentation standard, or key elements of a voluntary safe storage and handling standard, both of which are intended to prevent nitrous oxide explosions;  Airgas safeguards that failed to prevent the explosion include an automatic shutdown safety control and an explosion prevention device;  The automatic shutdown safety control Airgas relied on required the Airgas worker to be physically present – and located immediately adjacent to the trailer truck – in order to bypass the shutdown at a time when an explosion was most likely to occur; and  The Airgas explosion prevention device – a flame arrestor – was never tested or inspected to ensure it could protect workers from an explosion.  Airgas failed to apply lessons from previous nitrous oxide explosions; and  Airgas did not provide its Cantonment facility with an appropriate level of technical staffing support. 6. Through its subsidiaries, Air Liquide is the current owner of the nitrous oxide manufacturing facility in Cantonment, and the facility is one of three sites operating under the Airgas name. At the time of the incident, Air Liquide owned and operated all five nitrous oxide manufacturing facilities in the United States and Canada. Each of the nitrous oxide manufacturing plants is equipped with trailer truck loading facilities. Air Liquide ships nitrous oxide throughout North America by trailer truck and unloads it into storage tanks at customer facilities. Nitrous oxide customers include industrial users, universities, and hospitals, where workers and members of the public face additional exposure to potential explosions during liquid nitrous oxide transfers. 7. As a result of its investigation, the CSB is issuing safety recommendations to Air Liquide (Airgas), the Compressed Gas Association, and to both ACD and Cryostar (two nitrous oxide pump manufacturers).

CSB • Investigation Report • Airgas • Cantonment, Florida 11 II. Background Information A. Industry and Corporate Overview 1. The corporate headquarters for Air Liquide is in Paris, France, and the company employs about 68,000 people in 80 countries.2 On August 28, 2016, the day of the incident, Air Liquide owned and operated all five nitrous oxide manufacturing facilities in the United States and Canada. As shown in Figure 1, these facilities are located in:3 1) Richmond, California 2) Yazoo City, Mississippi 3) Cantonment, Florida 4) Donora, Pennsylvania 5) Maitland, Ontario

Figure 1. Map showing the five nitrous oxide manufacturing facility locations in the United States and Canada. Map created from www.mapcustomizer.com using Google Maps. 2. On May 23, 2016, American Air Liquide Holdings, Inc. (“Air Liquide”) acquired Airgas, Inc. (“Airgas”), the largest producer of nitrous oxide in North America, making Airgas a subsidiary of Air Liquide.4, 5 Before the acquisition, at the beginning of 2016, Air Liquide owned and operated

2 Air Liquide is an industry leader in the production of nitrous oxide, among many other products, technologies, and services. See Air Liquide in brief [111]. 3 See FTC document detailing nitrous oxide manufacturing locations [224]. 4 See Airgas is the largest nitrous oxide manufacturer in North America [112]. 5 See Air Liquide press release announcing completion of Airgas acquisition [214].

CSB • Investigation Report • Airgas • Cantonment, Florida 12

only two of these plants – Richmond and Donora. Airgas, at the time a separate company, owned and operated the other three sites – Yazoo City, Cantonment, and Maitland.6 3. As part of this transaction, the United States Federal Trade Commission (FTC) accepted a consent agreement that, among other things, called for Air Liquide to divest the Richmond and Donora nitrous oxide manufacturing plants.7, 8 As a result of the agreement, Air Liquide sold the Richmond and Donora facilities to Matheson Tri-Gas on September 8, 2016.9 4. Currently, Airgas operates three nitrous oxide manufacturing facilities in North America – Cantonment, Yazoo City, and Maitland. The Cantonment facility is the only North American nitrous oxide manufacturing location that does not use ammonium nitrate decomposition technology. At Cantonment, Airgas produces nitrous oxide from the co-product gas of an adjacent chemical manufacturing facility. B. Cantonment Nitrous Oxide Manufacturing Plant Overview

  1. Facility History

Puritan-Bennett began design of the Cantonment, Florida facility in 1980, initiated construction in 1982, and started manufacturing nitrous oxide at the site in 1983. At the time, Puritan-Bennett was the largest supplier of nitrous oxide in North America. In 1996, Puritan-Bennett merged with Nellcor and the facility operated under the Nellcor Puritan Bennett name. This merger lasted until 1998, when Mallinckrodt purchased the Cantonment facility. 6. In 2000, Airgas acquired the facility from Mallinckrodt and the company name changed to Nitrous Oxide Corp.10 Air Liquide then acquired the Airgas nitrous oxide business in May 2016.11 As a subsidiary of Air Liquide, the Cantonment facility remains under the Nitrous Oxide Corp. ownership name, but Airgas is the more common name used by employees, the community, and on signs at the facility.12 (Figure 2)

6 The three Airgas nitrous oxide facilities operate as part of Nitrous Oxide Corp. 7 See FTC Analysis of Consent Agreement [4]. 8 The FTC ordered a similar divestiture of the Richmond, California and Donora, Pennsylvania sites in 2001 following the Airgas acquisition of all nitrous oxide manufacturing facilities in the United States and Canada in January 2000. See Federal Trade Commission Decision at page 717 [7]. 9 See Matheson news release [5]. Matheson is an industrial gas and equipment company with over 9,000 employees in 16 countries. See Matheson web site [6]. 10 See 2001 FTC News Release [7]. 11 See Air Liquide press release announcing completion of Airgas acquisition [214]. 12 See Delaware Department of State: Division of Corporations: File Number 2049053 [145]. Although Air Liquide owned the Cantonment facility at the time of the incident, this report will use the trade name, Airgas, to refer to the Cantonment facility unless required to identify the facility with respect to Air Liquide’s current ownership. The CSB is also directing safety recommendations to Air Liquide in its capacity as the parent company.

CSB • Investigation Report • Airgas • Cantonment, Florida 13

Figure 2. Post-incident photo of the administrative and operations building at the Airgas nitrous oxide manufacturing facility in Cantonment, Florida nitrous oxide manufacturing facility. Although the official corporate name is Nitrous Oxide Corp., the Airgas name is more commonly used.

  1. Process Description

As noted above, the feed to the Airgas nitrous oxide process is a co-product gas from a chemical manufacturing facility adjacent to the Airgas facility.13 (Figure 3) This feed gas contains primarily nitrous oxide, nitrogen, oxygen, and carbon dioxide.

Figure 3. Overhead photo of the Airgas manufacturing facility shown in purple. The larger facility located to the north is the neighboring chemical manufacturing facility. Photo from Bing Maps.

13 Airgas receives a portion of the nitrous oxide co-product gas from a neighboring chemical manufacturing facility.

CSB • Investigation Report • Airgas • Cantonment, Florida 14

The Airgas process separates the nitrous oxide from the other components. Next, the nitrous oxide is compressed, condensed, and stored in one of three 50-ton horizontal storage tanks. (Figure 4) The liquid in these tanks is stored at its boiling point, typically 0 to -10 degrees Fahrenheit (°F). Figure 4. Post-incident photo showing one of the three 50-ton nitrous oxide storage tanks. 9. From storage, Airgas pumps the cold liquid nitrous oxide into insulated trailer trucks or shipping containers. After loading, Airgas transports the nitrous oxide trucks and shipping containers to its many North American customer distribution sites, which include industrial facilities, hospitals, and universities. (Figure 5)

Figure 5. Photo showing a typical trailer truck used at Airgas to transport nitrous oxide to customers.

CSB • Investigation Report • Airgas • Cantonment, Florida 15 10. Airgas uses U.S. Department of Transportation (DOT) MC-331 trailers to transport nitrous oxide.14 (Figure 6)

Figure 6. Trailer 182 design. This is a pre-incident photo of the Trailer 182 nameplate. Manufactured in 2014, Trailer 182 was built to the MC-331 specification. The trailer volume is 5,400-gallons with a maximum allowable working pressure (MAWP) of 325 pounds per square inch gauge (psig). 11. Although Airgas ships both trailer trucks and shipping containers, trailer trucks are more common and were involved in the August 28, 2016, incident. Figure 7 shows a simplified schematic of the equipment Airgas used to transfer liquid nitrous oxide from storage to a trailer truck.

Figure 7. Simplified flow diagram of Airgas equipment used to load trailer trucks with nitrous oxide. This approach to loading a truck is called the “two-hose method,” in reference to the two separate hoses (one vapor and one liquid) connected to the truck. “N2O” is the chemical formula for nitrous oxide and serves as an abbreviation.

14 See Texas Trailer website [8] and 49 C.F.R. § 178.337 (accessed December 22, 2016).

CSB • Investigation Report • Airgas • Cantonment, Florida 16

Airgas used the “two-hose method” for truck loading at Cantonment. One hose connects the nitrous oxide pump outlet (discharge) to the bottom (liquid inlet) connection of the trailer truck. The second hose connects the top (vapor) of the trailer truck to the top (vapor) of the nitrous oxide storage tank to equalize or “balance” the pressure between the storage tank and the trailer truck.

Airgas employees informed CSB investigators that there is no level indicator on the trailer truck to indicate how much nitrous oxide is loaded. To prevent overfilling, U.S. Department of Transportation (DOT) regulations require MC-331 nitrous oxide trailers to be equipped with a method to prevent completely filling a trailer.15

From the storage tank, liquid nitrous oxide flows to a transfer pump. The pump provides additional pressure needed for liquid to flow into the trailer truck, because the storage tank sits close to the ground. (Figure 4) The trailer truck sits atop wheels (Figure 5) that elevate it approximately four feet above the bottom of the storage tank.

As shown in Figure 8, Airgas installed filtration strainers (y-strainers) on the pump inlet and outlet. To improve the strainer’s utility as a flame arrestor, the company filled these strainers with steel wool to prevent a nitrous oxide decomposition reaction from causing an explosion in either the storage tank or the trailer truck. Figure 8. The left graphic is a generic depiction showing a typical application for a y-strainer – removing solid particles from a liquid stream.16 The photo on the right shows one of the nitrous oxide pumps at Airgas, the ACD centrifugal pump. The y-strainers are circled in yellow. Airgas installs steel wool into the open cylinder of the y-strainer to function as a flame arrestor. 16. Airgas installed a flow meter between the pump and the trailer truck.17 This flow meter allowed the operator to monitor the total amount of liquid nitrous oxide transferred to the trailer truck and

15 49 C.F.R. § 173.315. Airgas uses a fixed length dip tube to prevent completely filling a trailer. 16 See y-strainer photo [9]. 17 See Turbine Flowmeter [10] and Sponsler T675 - Deliver System Totalizer [11].

CSB • Investigation Report • Airgas • Cantonment, Florida 17 provided an automatic shutdown (safety interlock) to turn off the pump motor when the meter detected a low-flow rate.18 17. This low-flow safety interlock is critical because at least three other nitrous oxide industry explosions appear to have started when pumps generated heat from loss of prime, low-flow rate, or dry running. An operating pump generates heat and without enough liquid flow the temperature of pump components increase. At times, nitrous oxide industry pumps have developed enough heat to initiate decomposition explosions. 18. The Airgas truck loading process required manual operation by on-site personnel, with no automatic controls other than the safety interlock associated with the pump. 19. Although not shown in Figure 7, Airgas installed two nitrous oxide transfer pumps configured in parallel. Having two pumps allowed Airgas to have a spare pump. The company installed the second pump because replacement pumps from the original manufacturer, Smith Precision Products (“Smith”), were no longer available. 20. In 2014, Smith stopped manufacturing this pump for nitrous oxide service. As a result, Airgas recognized the need to purchase a new nitrous oxide pump from a different manufacturer. The original Smith nitrous oxide transfer pump utilized a gear-type positive displacement technology.19 After Smith notified Airgas that Smith would no longer produce its nitrous pumps, Airgas first installed a Cryostar and later an ACD pump (both centrifugal pumps) to load trailers at the Cantonment facility.20, 21 The Smith pump remained installed as a backup. 21. The gear-type positive displacement Smith pump was equipped with a pressure relief device on the outlet (discharge) side of the pump with the outlet piping from the relief device routed to the inlet (suction) side of the pump as shown in Figure 7. Providing a relief device on the discharge of a positive displacement pump is common as this type of pump can generate pressure beyond equipment design conditions. 22. The new centrifugal pumps were also equipped with a pressure relief device on the outlet side of the pump with the discharge piping from the relief device routed to the suction side of the pump, as shown in Figure 7. Although Airgas does not have documentation showing the basis for this relief device, it is likely that the company copied the design for the centrifugal pump relief valve from the design of the relief valve installed on the positive displacement Smith pump. In addition, although recycling the outlet of the relief valve back to the pump inlet piping can protect against overpressure, it also recycles heat gained by the fluid from the pump and can lead to vapor formation. As discussed later in Section IV.D.2 (Pump Recycle Piping), good piping design

18 This automatic shutdown or safety interlock is also referred to as a low-flow or run-dry interlock. Run-dry, low-flow, and loss of prime all refer to the general condition of a pump operating without enough liquid flow. 19 See Smith Precision Products company website [12]. 20 See Cryostar company website [13]. 21 See ACD company website [68].

CSB • Investigation Report • Airgas • Cantonment, Florida 18

practice suggests routing the recycle back to the storage tank, away from pump’s liquid supply connection.

  1. Nitrous Oxide Industry Safety Standards

The Compressed Gas Association (CGA) is an industry association that publishes a number of voluntary nitrous oxide safety standards.22 24. CGA standards concerning the handling and transfer of nitrous oxide include:  CGA G-8.1–2013, Standard for Nitrous Oxide Systems at Customer Sites  CGA G-8.2–2010, Commodity Specification for Nitrous Oxide  CGA G-8.3–2016, Safe Practices for Storage and Handling of Nitrous Oxide  CGA G-8.4–2016, Safe Practices for the Production of Nitrous Oxide from Ammonium Nitrate 25. Among these voluntary standards, CGA G-8.3–2016, Safe Practices for Storage and Handling of Nitrous Oxide is most applicable to the storage and liquid trailer truck loading operations at the Airgas facility in Cantonment, Florida. 26. Due to global coordination efforts by industrial gas associations, CGA G-8.3–2016 is effectively an international standard. Each equivalent gas association standard notes: This publication is intended as an international harmonized publication for the worldwide use and application by all members of Asia Industrial Gases Association (AIGA), Compressed Gas Association (CGA), European Industrial Gases Association, and Japan Industrial and Medical Gases Association (JIMGA). Each association’s technical content is identical, except for regional regulatory requirements and minor changes in formatting and spelling.23 (Emphasis added.)

  1. Nitrous Oxide Decomposition Reaction

The CGA notes in its standard that nitrous oxide is a stable compound under normal operating conditions:

22 See CGA publications [152]. 23 See AIGA - Safe Practices for Storage and Handling of Nitrous Oxide at page 2 [215]. Although this report makes many references to CGA G-8.3–2016, this CGA standard is not a public document and costs about $100. The AIGA version of this standard, AIGA 081/16, Safe Practices for Storage and Handling of Nitrous Oxide, is a public document and contains nearly the same language as CGA G-8.3–2016.

CSB • Investigation Report • Airgas • Cantonment, Florida 19 Under normal operating conditions, nitrous oxide is a stable compound in both the liquid and gaseous states. Nitrous oxide is classified as a nonflammable gas, with oxidizer as a secondary classification.24 28. But the CGA also describes the self-reactive decomposition of nitrous oxide, including the hazard, chemistry, effects, and limitations of the reaction.25 The standard explains that in certain gaseous conditions nitrous oxide can decompose violently: “Nitrous oxide can decompose explosively, into nitrogen and oxygen:”26 2𝑁2𝑂 𝑦𝑖𝑒𝑙𝑑𝑠 → 2𝑁2 + 𝑂2 + Heat27 “Accidents and experiments have shown that nitrous oxide, as a result of its positive formation energy, can decompose exothermally. This decomposition reaction can be self-sustaining and violent. The theoretical pressure ratio at decomposition, final pressure/initial pressure, can reach 10 to 1.”28 “Laboratory results indicate that nitrous oxide can be safely handled in the liquid state, but decomposition hazards exist in the gaseous state at elevated pressure and/or temperature. The reaction can propagate through vapor with liquid present.”29 29. Although it can be violent, the self-reactive nitrous oxide decomposition reaction is relatively slow. By comparison, the propagation speed of the nitrous oxide decomposition reaction is 30 times slower than the flame propagation speed for propane with air.30 As a result, the CGA states that the decomposition reaction is “easily quenched.”31 30. CGA provides a chart (Figure 9) showing conditions needed to propagate an explosive nitrous oxide decomposition reaction. In general, for each piping diameter, higher pressure results in lower propagation temperature. Smaller piping diameters also require a higher combination of temperature and pressure to sustain the decomposition reaction. CGA recommends operating “below the propagation threshold by controlling pressure, temperature, or line [piping] size.”32

24 See [150], Section 4.3.2. 25 A self-reactive chemical is a thermally unstable substance susceptible to undergo a strongly exothermic decomposition. See self-reactive definition [14]. 26 See [150], Section 4.3.2. 27 The reaction is exothermic and liberates 800 British Thermal Units per pound of nitrous oxide. See [150], Section 4.3.2. 28 See [150], Section 4.3.2. 29 Id., at Section 4.3.2. 30 Propagation speed refers to the speed that the reaction travels through the piping. See definition of propagation speed [99]. 31 See [150], Section 4.3.2. 31 Id., at Section 4.3.2. 32 Id., at Section 4.3.3.3.

CSB • Investigation Report • Airgas • Cantonment, Florida 20

Figure 9. CGA Propagation threshold for nitrous oxide decomposition reaction.33 31. Contamination of nitrous oxide may lower the propagation threshold.34 Nitrous oxide manufacturers do not fully understand the full range and effect of contaminants, but known contaminants include flammable hydrocarbons and combustible materials.35 In addition, metal particles may act as a catalyst.36 As a result, equipment in contact with nitrous oxide requires cleaning to oxygen service standards and “[v]isible particles, fibers, or drops of water shall not be accepted. 37 32. Nitrous oxide decomposition explosions have occurred from, among other things, pumps running dry, hot work, and sudden or rapid compression of the vapor (adiabatic compression).38 CGA provides a table of sources known to have initiated a nitrous oxide decomposition reaction.39 (Figure 10)

33 Id., at Section 4.3.3.3. 34 Id., at Section 4.3.3.4. 35 Id., at Section 4.3.3.3. 36 See Scaled Composites Nitrous Oxide Safety Guidelines at page 3 [15]. 37 See [150], Section 5.5. 38 Adiabatic means without heat transfer – without gain or loss of heat. See definition of adiabatic [16]. 39 See [150], Section 4.3.3.

CSB • Investigation Report • Airgas • Cantonment, Florida 21

Figure 10. Table of sources known to initiate the nitrous oxide decomposition reaction.

  1. Trailer Loading

CGA recommends using a ground-mounted pump adjacent to the storage tank to fill trailers. The standard requires designing pump piping to meet the pump manufacturer’s inlet liquid pressure requirements.40 34. To prevent the accumulation of static electrical charges, the standard recommends electrically bonding the trailer to the storage tank and ensuring the system is grounded.41, 42 35. For additional safety, CGA recommends filling operations enter the bottom of a tank to “allow a potential decomposition starting at the pump to be quenched in the liquid phase.”43 To accomplish this for trailer truck loading, CGA recommends using the two-hose method to load into the bottom of the trailer to prevent a decomposition reaction. The standard recommends: Transport tanks [trailers] should be filled by the two-hose filling procedure in order to minimize pressure differential and the hazard of decomposition. Filling shall be made through the bottom fill line and the gas phase shall be directed back to the stationary tank. Filling through the top equalizing line or any other line to the top is not recommended in order to avoid heat input into the gas phase by a hot running pump.44

  1. Safeguards to Prevent Pumps from Causing Explosions

For a liquid nitrous oxide transfer system, such as the one used by Airgas at Cantonment, the transfer pump can be a source of heat. As noted in Figure 10, heat generated by a dry running pump can cause pump components to exceed the temperature needed to start a nitrous oxide decomposition reaction.

40 Id., at Section 8.2. 41 Id., at Sections 5.7 and 8.2. 42 See explanation of bonding and grounding [212]. 43 See [150], Section 6.4. 44 Id., at Section 8.2.

CSB • Investigation Report • Airgas • Cantonment, Florida 22

Although not defined in CGA G-8.3–2016, “dry running” is likely applicable to any condition that creates an insufficient liquid supply to the pump and generates heat, increasing the temperature of a pump component.

CGA G-8.3–2016 describes the potential for a pump to initiate a nitrous oxide explosion. The standard states, “Pumps shall not be allowed to operate with no flow or loss of prime. A number of serious incidents have been attributed to overheated equipment.”45

The standard recommends piping configuration and suggests using strainers as a flame arrestor (Section IV.C.1).46 The standard states: Best practice for liquid transfer pumps is to install the pump with a flooded suction line and a liquid return connection to help quench a decomposition reaction. Strainers should be installed on the suction and discharge of liquid pumps to provide a heat sink that assists in quenching a decomposition flame front ….47

To prevent nitrous oxide explosions from high pump temperature, CGA requires a nitrous oxide loading pump to be equipped with a protective interlock – “[n]itrous oxide transfer pumps shall be provided with an interlock to prevent dry running ….”48

CGA further explains that the safety function of this protective interlock is to prevent the pump from operating during conditions that can generate extra heat: The primary hazard during pump operation is dry running, which leads to heating and damage of the pump. Nitrous oxide can over heat and cause a decomposition reaction, which can lead to an explosion. Dry running is most often experienced at startup of the pump and when loss of prime occurs during operation. Provide an interlock system that allows the pump to start only after it has been properly cooled down and filled with liquid product, which protects the pump from dry running.49 And: All pumps, compressors, or other equipment with rotating or sliding components shall be protected by automatic controls against loss of prime and excessive operating temperatures.50 45 Id., at Section 5.7. 46 See Section IV.C.1 of this report for more information on flame arrestors. 47 See [150], at Section 5.7. 48 Id., at Section 4.3.3.5. 49 Id., at Section 7.4.3. (Emphasis removed from original). 50 Id., at Section 5.7.

CSB • Investigation Report • Airgas • Cantonment, Florida 23 C. History of Nitrous Oxide Explosion Incidents 42. The CSB identified six previous major explosion incidents in the nitrous oxide industry that occurred before the explosion at Cantonment. (Figure 11) Since 1973, the nitrous oxide industry has averaged one major explosion about every seven years. These incidents killed six workers and injured 21 other people.51 In addition, since 2001 these explosions have occurred more frequently with an average of one explosion every four years during this timeframe.

Figure 11. History of nitrous oxide explosions. 43. Of the six reactive chemical incidents prior to the Cantonment explosion, three reportedly occurred from a similar scenario – a nitrous oxide transfer pump created enough heat to trigger an explosive nitrous oxide decomposition reaction.  In 1980, a pump initiated a nitrous oxide explosion at a Puritan-Bennett facility in Richmond, California. According to the investigation report: “Miraculously, the operator was not injured …”;  In 2001, a pump initiated a nitrous oxide explosion at a Linde facility in Eindhoven, the Netherlands. Linde concluded that the explosion would have likely killed a worker, but he left the area minutes before the explosion. The explosion also injured ten other people; and

51 Of the 21 injuries, at least two were members of the public.

CSB • Investigation Report • Airgas • Cantonment, Florida 24

 In 2012, a pump initiated a nitrous oxide explosion at an Air Liquide facility in Moncada, Spain that killed one worker and injured five others. 44. CGA G-8.3–2016 gives an overview of previous nitrous oxide explosions, stating: Most nitrous oxide decomposition incidents have occurred in large pressure vessels, such as a storage tank or cargo tank. As the vapor volume and temperature increase, the risk of disassociation increases…. The decomposition [reaction] can also be initiated by external heat (such as welding or brazing) on the vessel or vessel piping, or heat generated by a dry running pump. If initiated in the piping, the reaction front can travel through the piping and into the vessel, if operating above the propagation threshold. Once the reaction front is inside the vessel there is effectively no heat sink to quench the reaction. Since 1.5 moles of gas are created for each mole of decomposed nitrous oxide, the decomposing nitrous oxide compresses and heats the unreacted nitrous oxide as the reaction front moves into the vessel. Eventually, the unreacted nitrous oxide reaches high enough temperature and pressure to auto-initiate, resulting in an explosion [due to the rapid pressure increase].52

  1. 1973 Pratt & Whitney Explosion – West Palm Beach, Florida

In July 1973, a nitrous oxide explosion and fire occurred at a Pratt & Whitney facility in West Palm Beach, Florida.53 During preparations to test a chemical laser, a 550-gallon tank of gaseous nitrous oxide at a pressure of about 1,300 pounds per square inch (psi) and a temperature of nearly 400 °F exploded as the result of a violent nitrous oxide decomposition reaction.54 46. The explosion caused significant property damage, but there were no injuries. A Pratt & Whitney investigation report detailed the findings. The report showed that changes to previous operating conditions, including higher temperature and a faster rate of increasing the pressure, likely started a nitrous oxide decomposition reaction from rapid (adiabatic) compression.55 The company also concluded that the higher temperature was not likely a direct cause of the explosion, but since lower ignition energy is required at higher temperature, the increased temperature increased the hazard.56

52 See [150] at Section 4.3.3.5. (Emphasis in original). 53 See [18] at page 9. Also see Nitrous Oxide Explosive Hazards at pages 5 and 6 [17], as well as Nitrous Oxide Trailer Rupture at page 23 [1]. 54 See [18] at page 18. 55 See [18] at page 17. 56 See [18] at page 17.

CSB • Investigation Report • Airgas • Cantonment, Florida 25

  1. 1980 Puritan-Bennett Explosion – Richmond, California

In November 1980, an explosion occurred when loading a trailer truck at a Puritan-Bennett nitrous oxide plant in Richmond, California.57, 58 The explosion “blew out the walls of a plant building, shattered windows in a 10-block area and rocked communities as far as 10 miles away.”59 “Authorities in surrounding communities and in San Francisco across the bay from Richmond received hundreds of telephone calls from residents asking if an earthquake had occurred.”60 48. In its investigation report, Puritan-Bennett stated: “Miraculously, the operator was not injured despite the complete destruction of the process building and the scatter of pieces of the … trailer, process piping and small equipment about the entire plant.”61 49. The Puritan-Bennett incident report showed that the explosion occurred when the loading pump operated without enough liquid supply (running dry) and the resulting temperature increase from the pump propagated an explosive nitrous oxide decomposition reaction.62 The report explained that the trailer was empty and the explosion occurred shortly after initiating a transfer of liquid into the trailer.63 The report also noted that the presence of an excessive amount of sealant inside the pump might have acted as a contaminant, which “greatly enhances the propagation potential of the decomposition of nitrous oxide.”64 50. Puritan-Bennett’s post-incident recommended corrective actions included installing a new pump to provide five feet of elevation between the bottom of the storage tank and the pump to “assure pump priming and continued suction flooding.”65 51. The company also recommended installing a safety interlock to prevent the pump from running dry. With the safety interlock installed, the Puritan-Bennett investigation report concluded, “ignition at the pump caused by frictional heat will not be possible now since the pump will be prevented from running dry because of the low [motor] load switch.”66 52. Furthermore, as shown in Figure 12, the company developed a piping system standard that added metallic flame arrestors in addition to strainers on the pump suction and discharge piping to prevent propagation of a potential nitrous oxide decomposition reaction.67 Puritan-Bennett also

57 See Richmond explosion news article - November 6, 1980 [203]. 58 At the time of the Cantonment explosion, August 28, 2016, the Richmond, California facility was owned and operated by Air Liquide. 59 See Richmond explosion news article - November 6, 1980 [203]. 60 Id. 61 See [20] at page 18. 62 See [20] at pages 12-14. 63 See [20] at page 12. 64 See [20] at page 51. Contamination can lower the safe operating limit conditions for the nitrous oxide decomposition reaction. The exact effect of contamination on nitrous oxide decomposition is not fully understood. Possible contaminants were identified at Airgas during post-incident equipment evaluation. As a result, contamination may have contributed to the explosion at Airgas. 65 See [20] at page 214. 66 See [20] at page 215. Puritan-Bennett used the low motor load switch as a safety interlock to shut down the pump motor when the pump was running and a condition such as dry running may have caused the motor power to drop to an abnormally low amount of power. 67 See [20] at page 216. The Puritan-Bennett investigation report shows that providing these metallic flame arrestors was in addition to the strainer on the pump inlet (suction) and outlet (discharge) piping.

CSB • Investigation Report • Airgas • Cantonment, Florida 26

recommended using flexible connectors to connect the piping to the pump, which reduced piping stress. Additionally, the company applied a startup bypass valve that circulated liquid back to the storage tank, yet away from the pump inlet piping. Because the storage tank would contain a protective inventory of liquid nitrous oxide, this configuration reduced the risk of an explosion while starting and cooling down the pump.

Figure 12. Simplified schematic of the recommended design standard for nitrous oxide transfers developed by Puritan-Bennett following the 1980 explosion at the Richmond, California facility. Post-incident, the company recommended both a strainer and a metallic flame arrestor on each side of the pump.

CSB • Investigation Report • Airgas • Cantonment, Florida 27

  1. 1987 Butler-Amerigas Explosion – Reading, Pennsylvania

In May 1987, an explosion killed a welder working on a 6.5-ton nitrous oxide tank system at a Butler-AmeriGas facility in Reading, Pennsylvania.68, 69 The explosion also injured three people including one plant worker and two members of the public.70 54. OSHA’s accident investigation summary stated, “Employee #1 was using an oxyacetylene torch to heat a Freon pipeline during modification of and/or repair to a nitrous oxide storage tank. An explosion occurred and he was killed.” In addition, a news article describing a subsequent lawsuit stated, “The official explanation of the explosion was that heat from the [welding] torch prompted the nitrous oxide to decompose which, in turn, created immense pressure in the tank.”71

68 See OSHA inspection report [128]. 69 See Pennsylvania news article - May 12, 1987 [22]. 70 See Associated Press news article [21]. 71 See News article on Air Products lawsuit [23].

CSB • Investigation Report • Airgas • Cantonment, Florida 28

In July 2001, an explosion occurred when loading an empty trailer truck at a Linde nitrous oxide plant in Eindhoven, the Netherlands, injuring ten people.72 (Figure 13) Linde concluded the explosion would have killed the driver, but he left the immediate area before the explosion.73 The explosion resulted in heavy damage to the facility as well as neighboring businesses.74

A report by European authorities indicated that starting the loading pump without enough liquid supply (running dry) was causal to the incident.75 A more detailed investigation report noted that carbon particles from a damaged bearing might have facilitated propagation of the explosive nitrous oxide decomposition reaction.76 European authorities also stated that lessons learned include taking measures to prevent pump overheating and placing flame arrestors around the pump.77, 78 Figure 13. Photo of damage following the July 2001 nitrous oxide truck-filling explosion in Eindhoven, the Netherlands. Photo from [1].79

72 See Nitrous Oxide Trailer Rupture [1]. 73 Id. 74 See [24] at page 5. 75 See European Union Accident Profile [32]. 76 See [24] at page 21. 77 See Major Accident Report [32]. 78 An alternate spelling for flame arrestor is flame arrester. 79 See Nitrous Oxide Trailer Rupture [1].

CSB • Investigation Report • Airgas • Cantonment, Florida 29

  1. 2007 Scaled Composites Explosion – Mojave, California

In July 2007, a nitrous oxide decomposition reaction exploded a storage tank during testing of a rocket engine nozzle by Scaled Composites in Mojave, California, killing three people and injuring three others.80, 81, 82, 83 (Figure 14)

Figure 14. Photo of damage following the July 2007 nitrous oxide tank explosion in Mojave, California. Photo from parabolicarc.com84 58. Cal/OSHA investigated and issued citations totaling $25,870.85, 86 Cal/OSHA reported that the explosion took place about three seconds into a 15-second test conducted by Scaled Composites. The Cal/OSHA investigation file showed that 10,000 pounds of nitrous oxide was held at 390 pounds of pressure at 70 °F.87 To abate the citations, Cal/OSHA required Scaled Composites to

80 See California news article [202]. 81 See Evaluation of Cal/OSHA report on Scaled Composites accident [143]. 82 See NBC News Video [144]. 83 See News Article Covering Cal/OSHA Investigation [87]. 84 See Post-Incident photo of Scaled Composites Explosion [119]. 85 See Cal/OSHA Investigation File - Scaled Composites Explosion [117]. Although Cal/OSHA was not able to provide the CSB with investigation records because the agency only retains them for seven years, the website knightsarrow.com provides a link to its copy of the Cal/OSHA investigation file: Cal/OSHA Investigation File - Scaled Composites Explosion, [117]. 86 See space.com article on Scaled Composites Cal/OSHA citations [25]. “The citations, issued Thursday, faulted the Mojave, Calif.-based firm for failing to provide ‘effective information and training of the health and physical hazards associated with nitrous oxide,’ a compound used during a July 26 test that ended in an explosion, killing three employees and injured three others at the Mojave Air and Space Port.” 87 See Cal/OSHA Investigation File - Scaled Composites Explosion at page 13 [117]. The nitrous oxide conditions reported by Cal/OSHA may not be accurate as these are not equilibrium conditions. See Thermodynamic Properties of Saturated Nitrous Oxide [113].

CSB • Investigation Report • Airgas • Cantonment, Florida 30

apply several safety management system elements to its rocket motor programs including safety information, hazard analysis, mechanical integrity, and operating procedures.88 59. The cause of the incident was not publicly reported; however, post-accident safety guidelines published by Scaled Composites in June 2009 suggest the incident may have been caused by adiabatic compression with contamination of the nitrous oxide.89 60. The Scaled Composites safety guidelines also identified non-stainless steel metal as a possible contaminant that can significantly reduce the amount of heat needed to trigger an explosive nitrous oxide decomposition reaction.90, 91 The guidelines stated, “remove all corrosion prone metals (non- stainless steels, etc.) from the N2O [nitrous oxide] oxidizer flow path and/or storage, due to risk of catalytic reaction.”92 In addition, the safety guidelines addressed important nitrous oxide storage vessel design safety features: In the event that ignition prevention measures and deflagration wave mitigations fail, pressure vessel designs should allow for a controlled failure upon overpressure. In large oxidizer systems operated at high pressures, the energy released during a tank rupture for [whatever] reason (structural, overpressure, feedback, decomposition) is very high. This failure mode should be designed for with burst disk or other similar safety precautions that can safely reduce the PV [pressure volume] energy in the vessel without catastrophic failure.93, 94 61. The safety guidelines published by Scaled Composites include important information about potential ignition sources. The guidelines state: Design all components and assemblies so that they are incapable of releasing any substantial amount of energy into the oxidizer. No component or assembly should be capable of producing a temperature, for any length of time, on any surface, above 573 deg K degrees Kelvin [degrees Fahrenheit].95

88 See Cal/OSHA Investigation File - Scaled Composites Explosion at page 41 [117]. 89 See Scaled Composites Nitrous Oxide Safety Guidelines [15]. 90 Id. 91 Non-stainless steel metal particles were identified in Airgas equipment during post-incident evaluation of equipment. See Section IV.E.1, Contamination Prevention and Gap in Chemistry Knowledge. 92 See Scaled Composites Nitrous Oxide Safety Guidelines [15]. 93 Id. 94 See Understanding Explosions at page 204 [107]. A deflagration is a reaction in which the speed of the reaction front propagates through the unreacted mass at a speed less than the speed of sound in the unreacted medium. If the reaction front speed exceeds the speed of sound, it is a detonation. 95 Although the basis for this temperature limit is not explained, the CSB notes that the 571 °F temperature limit described by Scaled Composites is close to the limit of 575 °F in CGA G-8.3–2016. CGA states that at 575 °F and 51.4 pounds per square inch (psi), nitrous oxide vapor is capable of auto-ignition. See [150], Section 4.3.3.1.

CSB • Investigation Report • Airgas • Cantonment, Florida 31 Put substantial effort into reviewing what will occur if, for any reason, any component of the N2O [nitrous oxide] oxidizer flow path ever does reach this temperature threshold.96 62. The nitrous oxide safety guidelines also addressed the potential for vapor (adiabatic) compression to initiate an explosion due to the presence of contaminants or incompatible materials. The Scaled Composites safety guidelines stated: Designs should attempt to minimize adiabatic compression in the system during flow of the N2O [nitrous oxide] oxidizer. Adiabatic compression alone has low effectivity in starting a decomposition reaction; however, the presence of contaminants or incompatible materials that can act as fuels may reduce the ignition threshold of N2O [nitrous oxide] to the point where adiabatic compression in an otherwise adequate system can begin a reaction.97

96 See Scaled Composites Nitrous Oxide Safety Guidelines [15]. 97 Id.

CSB • Investigation Report • Airgas • Cantonment, Florida 32

In September 2012, a nitrous oxide storage tank exploded while unloading an Air Liquide nitrous oxide trailer truck at a customer facility in Moncada, Spain killing the driver and injuring five other workers.98 (Figure 15) Figure 15. Photo of the damage following the September 2012 nitrous oxide explosion in Moncada, Spain.99 64. In January 2013, Air Liquide issued corporate-wide emergency safety guidance to prevent future explosions from nitrous oxide decomposition reactions. In addition, the company also shared safety lessons from its Moncada investigation with industry through an October 2013 presentation to the Compressed Gas Association.100 65. The safety information developed by Air Liquide suggests the following accident scenario for the Moncada explosion:  Prior to the explosion an Air Liquide trailer truck was making a delivery into a customer storage tank using the truck-mounted pump to transfer liquid nitrous oxide;  The explosion was likely caused by a nitrous oxide decomposition reaction that started from a high pump temperature because either the pump operated

98 See Spain News Article [123]. Note – use Google Chrome for an English translation. 99 See Additional Spain News Article [141]. Note – use Google Chrome for an English translation. 100 See CGA Safety and Reliability Seminar Presentation Schedule [148].

CSB • Investigation Report • Airgas • Cantonment, Florida 33 without enough liquid supply (running dry) or it was not properly cooled down;  The pump did not have an “adequate or functional”101 run-dry safety interlock and the nitrous oxide decomposition reaction propagated from the pump into the storage tank, causing the storage tank explosion;  Contamination introduced within the pump from previous maintenance work on the pump may have contributed to the explosion;  Flame arrestors were either not present or did not stop the propagation of the nitrous oxide decomposition reaction; and  The relief valves on the storage tank were not capable of sufficiently reducing the pressure to prevent an explosion. 66. To prevent future nitrous oxide explosions, Air Liquide safety guidance, among other things, recommended:  Installing a safety interlock to shut down the transfer pump if the pump runs dry or upon high pump outlet temperature;  Providing a safety interlock to prevent starting the transfer pump until the pump was properly cooled down;102  Including a safety interlock to protect the pump from excessive drive torque, such as from the motor;  Requiring safety interlocks to “fail safe,” such that any associated instrumentation failure would result in a pump shutdown;  Providing liquid and vapor piping to each bulk tank (storage tanks and trailer trucks) with a flame arrestor. The guidance noted a flame arrestor in the liquid piping to bulk tanks should better protect the tank from a nitrous oxide decomposition reaction that migrates from the pump and into the tank;  Ensuring pump maintenance shop cleanliness as well as cleaning wetted pump components to industry safety standards for oxygen cleanliness (CGA G-4.1 or EIGA Doc 33/06);103, 104

101 See [161] at page 6. 102 Air Liquide guidance for the automatic pump shutdown advises that the internal pump temperature should be no more than 9 °F above the liquid equilibrium temperature. For example, if the trailer truck being prepared for loading is operating at 265 psia, the nitrous oxide equilibrium temperature is about -4 °F and the safety interlock should not allow the transfer pump to start until the internal pump temperature is below 5 °F. For nitrous oxide equilibrium conditions, see Thermodynamic Properties of Saturated Nitrous Oxide [113]. 103 In the context of a pump, wetted parts include internal pump components exposed to liquid nitrous oxide during operation. 104 CGA G-4.1–2009 is the Compressed Gas Association (CGA) standard, Cleaning Equipment for Oxygen Service. See CGA G- 4.1-2009 [151]. EIGA Doc 33/06 is the European Industrial Gases Association (EIGA) standard, Cleaning of Equipment for Oxygen Service. See EIGA Doc 33/06 [109].

CSB • Investigation Report • Airgas • Cantonment, Florida 34

 Installing 100 mesh Monel strainers as a flame arrestor on the inlet and outlet of all nitrous oxide transfer pumps;105, 106, 107  Requiring that trailer trucks and storage tanks are electrically bonded; and  Classifying nitrous oxide transfer pumps as “critical equipment.”

  1. 2016 Airgas (Air Liquide) Explosion – Cantonment, Florida

Against this backdrop of nitrous oxide explosions – including a recent incident in Spain that killed a worker – the nitrous oxide industry incurred yet another tragic incident on August 28, 2016 at the Airgas facility in Cantonment, Florida. A common thread among these incidents may lie in the complexity of reactive chemicals. 68. Process safety expert and university professor Daniel Crowl stated that the chemical industry has a continuing problem with reactive chemicals, but technology and management systems exist to prevent these accidents: “The chemical industry has a continuing problem with reactive chemical accidents. This problem is due to the complex nature of chemical reactivity.”108 “[W]e cannot avoid reactive chemical hazards; however, chemical plant accidents involving reactive hazards are unacceptable. The technology and the management systems do exist to produce these products safely.”109 69. The Airgas explosion was likely the outcome of a self-reactive nitrous oxide decomposition that can occur if nitrous oxide vapor is heated. The decomposition of nitrous oxide produces primarily nitrogen, oxygen, and heat. Because the reaction produces heat, nitrous oxide decomposition can be self-sustaining and explosive. As will be explained in detail below, Airgas safety management systems were not sufficient to prevent this reactive chemical incident.

105 See [161] at page 7. 106 100 mesh refers to the size of the filter screen hole opening. See Titan Screen and Basket Selection Guide [26]. 107 Monel is an alloy (mixture of metals) consisting of primarily nickel and copper. See Monel [89]. 108 See Daniel Crowl's biography on the Michigan Tech website [140]. 109 See CSB Safety Video: Reactive Hazards at 19:08 [228].

CSB • Investigation Report • Airgas • Cantonment, Florida 35 III. The Incident 1. At approximately 12:10 pm (central daylight time or CDT) on August 28, 2016, an explosion occurred inside the nitrous oxide manufacturing unit at the Airgas facility in Cantonment, Florida.110 (Figure 16)

Figure 16. Overhead photo of the Airgas facility in Cantonment, Florida. Photo from Bing Maps.

110 As a result of the incident, roughly 250,000 pounds of nitrous oxide was released to the atmosphere.

CSB • Investigation Report • Airgas • Cantonment, Florida 36

Surveillance video from neighboring facilities captured the explosion (Figure 17) and the intense heat that it released. Based on the video, the duration of this heat release lasted less than two seconds. Figure 17. Surveillance video of the explosion along the perimeter fence of the Airgas Cantonment, Florida facility. 3. The explosion killed the only employee working at the facility at the time of the incident. The Airgas employee died from “explosion-related fragmentation and blunt force injuries.”111 4. The magnitude of the explosion was such that large metal fragments of equipment were scattered for hundreds of feet, and the resulting damage rendered the Airgas facility inoperable. (Figure 18) As a result of the explosion, the facility remains shut down as of the date of this report.

111 See [27].

CSB • Investigation Report • Airgas • Cantonment, Florida 37

Figure 18. Photo showing explosion damage at the Airgas facility in Cantonment, Florida. 5. Metal fragments projected into the adjacent chemical manufacturing facility and caused some damage to equipment, including a large cooling tower. The incident did not affect production at the neighboring facility. 6. On the morning of the incident there were six trailers and one shipping container parked in the nitrous oxide loading area. Two of the trailers were involved in the explosion. (Figure 19)

Figure 19. Surveillance video image showing the location of the nitrous oxide trailers on the morning of the incident. The explosion destroyed the two trailers on the left (green oval). Post-incident evaluation identified the left trailer as Trailer 182 and the right trailer as Trailer Y-3.

CSB • Investigation Report • Airgas • Cantonment, Florida 38

Post-incident evaluation confirmed Trailer 182 and Trailer Y-3 as the two trailers destroyed in the explosion. (Figure 20, Figure 21, Figure 22, and Figure 23) Figure 20. Pre-incident photos that help identify and locate where Trailer 182 (left) and Trailer Y-3 (right) were in Figure 19. Trailer Y-3 has distinct identifiable physical characteristics in the Figure 19 surveillance video.

Figure 21. Post-incident photo that shows damage from the explosion. Trailer 182 and Trailer Y-3 were originally located in the lower left quadrant of this photo.

CSB • Investigation Report • Airgas • Cantonment, Florida 39

Figure 22. Pre-incident (top) and post-incident (bottom) photos of Trailer 182. The bottom photo shows fragments of Trailer 182 during efforts to reconstruct their original location.

Figure 23. Pre-incident (left) and post-incident (right) photos of Trailer Y-3. The right photo shows fragments of Trailer Y-3 during efforts to reconstruct their original location.

CSB • Investigation Report • Airgas • Cantonment, Florida 40

Surveillance video of the explosion captured two distinct clouds. (Figure 24, Figure 25, and Figure 26) The first cloud is brown and originated with intense heat that is consistent with a decomposition reaction that developed in Trailer 182.112 The second cloud is white and is consistent with the rapid vaporization from Trailer Y-3 when it released its full 36,000 pounds of liquid nitrous oxide without an accompanying decomposition reaction. Figure 24. Surveillance video images capturing the intense heat of the explosion and the formation of two distinct clouds.

Figure 25. Surveillance video images capturing the explosion, the formation of two distinct clouds, and the dissipation of the white cloud.

112 The brown cloud is likely the result of nitrogen oxides formed as a by-product of the nitrous oxide decomposition. CGA G- 8.3 states: “While nitrogen and oxygen are the primary products from nitrous oxide decomposition, the higher nitrogen oxides (NO/NO2) are also produced.” See [150], Section 4.3.2.

CSB • Investigation Report • Airgas • Cantonment, Florida 41

Figure 26. Surveillance video images capturing the explosion, the formation of two distinct clouds, and the dissipation of the white cloud. 9. At the time of the incident, Trailer Y-3 contained a full load of liquid nitrous oxide. It appears likely from reviewing surveillance video and in examining recovered physical evidence that a fragment of Trailer 182 struck Trailer Y-3, causing Y-3 to rupture and release its contents without decomposition.

CSB • Investigation Report • Airgas • Cantonment, Florida 42

IV. Technical Analysis A. Trailer 182 was not loaded, but needed to be loaded 1. One Airgas employee, an operator, was working at the facility at the time of the incident. Airgas surveillance video captured many of the activities he performed. Surveillance cameras at the facility are motion activated and only record when they detect motion. The Airgas cameras recorded the operator performing routine activities such as checking equipment, testing samples, recording data, and changing a process filter. 2. Airgas cameras were not located in a position to record activities near the nitrous oxide storage tanks, transfer pumps, or rear of the trailer trucks. As a result, none of the recordings show the operator loading a trailer truck. The recordings also stop approximately 10 minutes before the incident. This is likely due to a combination of camera position and lack of detected motion. Further, the explosion interrupted electrical power and prevented the surveillance system from restarting and recording the incident. As noted above, however, cameras from two other companies captured surveillance footage of the explosion. 3. Evaluation of Airgas records and post-incident observations indicate that all of the trailers and the shipping container shown in Figure 19 were fully loaded before August 28, 2016, except Trailer

  1. Airgas completed loading of the last trailer prior to the incident, before midnight (CDT) on

August 27, 2016. When this trailer was loaded, only 16 inches of liquid nitrous oxide remained in the bottom of the storage tank and Airgas needed additional inventory to load Trailer 182. 4. The August 28, 2016, shift relief log at 6:00 am (CDT) indicates that Trailer 182 was empty; it had not been loaded with nitrous oxide.113 In addition, during the 12 hours from the time the last trailer was loaded (August 27, 2016, before midnight CDT) through the last recorded computer data before the incident (August 28, 2016, at approximately 12:10 pm CDT), no recorded computer data indicates a decrease in storage tank level as would be expected if Trailer 182 had been filled.114 Rather, the level in the storage tank steadily increased. The increase in storage tank inventory is consistent with the Cantonment nitrous oxide production rate, and indicates that Trailer 182 was not loaded at the time of the incident. (Figure 27)

113 When nitrous oxide trailer trucks return from customer deliveries they are still full of nitrous oxide vapor and may contain some amount of nitrous oxide liquid. 114 The force of the explosion breached piping between the nitrous oxide pumps and the trailer loading piping, causing all of the nitrous oxide in the storage tank to drain out.

CSB • Investigation Report • Airgas • Cantonment, Florida 43

Figure 27. Nitrous oxide storage tank inventory during the last 14 hours before the incident. Tank inventory decreased during loading of a trailer before midnight. The inventory steadily increased after that trailer was loaded, indicating that no truck or shipping container loading occurred during the last twelve hours. In order to protect actual production rate data, this chart does not show inventory values. 5. Unlike the storage tank, Airgas does not record computer process data for its liquid nitrous oxide transfer system. For example, Airgas did not record the pump motor status (on or off), motor power, discharge pressure, discharge flow, nitrous oxide temperature, or other process data. In addition, the Airgas process data computer lacked data-recovery capability to aid accident investigators.115 6. Before loading a trailer, a sample of the existing trailer vapor content is taken and analyzed to ensure the trailer was not contaminated since being previously loaded. Data contained in company records shows an Airgas operator recorded sample results from Trailer 182 on August 27, 2016, between 6:00 pm and midnight (CDT), confirming no contamination and indicating that Trailer 182 was ready to be loaded. 7. Shipping records indicate that Airgas personnel scheduled Trailer 182 to be loaded in order to depart at 2:00 pm (CDT) August 29, 2016, for a customer delivery in California. To meet this schedule, Airgas employees stated they would expect Trailer 182 to have been loaded on Sunday, August 28, 2016.

115 Airgas retained a computer expert to develop a method to recover data from the storage drive of the process computer. The work to retrieve the data was complicated because the commercial computer data system was not designed for post-accident data retrieval. Despite hiring an external computer expert, Airgas provided this data to CSB investigators 115 days after the explosion. If chemical manufacturing companies, used a real-time data recording system that includes a method to recover data after an accident, timely access to relevant data would aid industry in performing accident investigations. A data-recovery system would also aid the CSB in performing its mission, enabling the agency to provide stakeholders with more timely accident investigations informed by all relevant data.

CSB • Investigation Report • Airgas • Cantonment, Florida 44

B. Most Likely Incident Scenario 8. A nitrous oxide explosion is most likely to occur during initial transfer into a large vessel that is empty or near-empty, such as a customer storage tank or a delivery trailer. Industry safety standards advise directing such transfers into the liquid portion of a receiving vessel because this configuration acts as a layer of protection and allows a potential decomposition reaction starting at the pump to be quenched [stopped] in the liquid.116 9. Trailer 182 recently returned to Cantonment after delivering product to other customers. Having returned for reloading, the trailer did not contain a protective inventory of liquid nitrous oxide. Since Trailer 182 contained nitrous oxide vapor, but little or no liquid, it was susceptible to an explosion because the nitrous oxide decomposition reaction propagates through vapor. 10. A combination of physical evidence, computer data, and company records suggest that just before the incident, the Airgas operator likely initiated a transfer of liquid nitrous oxide from a storage tank to load Trailer 182 for shipping to a customer in California. Although other causes may be possible (see Section IV.E, Other Possible Causes), the CSB concluded that a nitrous oxide decomposition reaction likely started from the transfer pump and propagated into Trailer 182 during the transfer of product.117 11. Based on conditions and design of the pump system (detailed in Section IV.D, Nitrous Oxide Loading Pump System Design), the pump likely lost prime or ran dry during startup, which generated heat and increased the temperature of pump components. Consistent with at least three other historical nitrous oxide industry explosions, this temperature increase during pump startup likely initiated a nitrous oxide decomposition reaction. Because loading operations had likely started, a flow path existed for this reaction to propagate into Trailer 182, resulting in the explosion.118 12. At the time of the incident, existing safeguards to prevent a nitrous oxide explosion when loading trailers at the Airgas facility consisted of a run-dry protective interlock on the pump and makeshift flame arrestors created from strainers packed with steel wool. The CSB’s investigation revealed that these safeguards were poorly designed and ineffective (Section IV.C). In addition, the system design placed the Airgas operator directly in harm’s way. 13. To start the pump, an operator must manually push and hold two buttons in place. One button bypasses the run-dry safety interlock and the second button energizes the pump motor. After

116 See [150], Section 7.3.3. 117 Other possible contributing causes include contamination and static electricity. 118 The post-incident position of at least a dozen valves appears to have been altered by the force of the explosion. As a result, these valve positions are not reliable evidence for evaluating pre-incident piping alignment. See Section IV.F, Post-Incident Valve Positions.

CSB • Investigation Report • Airgas • Cantonment, Florida 45 satisfying the low-flow set point for the run-dry safety interlock, the operator can then release the buttons and the pump should continue to run.119 (Figure 28)

Figure 28. Photo showing the location of the nitrous oxide pump bypass and start buttons (yellow arrow), superimposed, before the incident. The red arrow points to the post-incident location of the actual metal frame where the buttons were mounted. The metal frame was attached to the base of the Smith pump. The nitrous oxide transfer pumps were located to the right of the yellow arrow. Nitrous oxide storage tank two is shown in the background. 14. Post-incident physical evidence, including blast damage observations and the location where emergency responders recovered the body of the deceased Airgas employee, indicate that before the explosion the Airgas operator was located between Trailer 182 and the south end of the nitrous oxide storage tank. (Figure 29) This location is consistent with the operator pressing and holding the interlock bypass button at the time of the explosion, as required by the interlock design.

119 The run-dry safety interlock at Airgas was designed to monitor the flow and shut off the pump motor if a low-flow rate was detected. As will be discussed in Section IV.C.2 (“Run-Dry” Safety Interlock), CGA safety standards also required this interlock to protect the pump from operating at high temperature, but the Airgas safety interlock design lacked temperature protection.

CSB • Investigation Report • Airgas • Cantonment, Florida 46

Figure 29. Photo showing an approximate location of the Airgas operator (yellow star) just before the incident. Trailer 182 was to the left of the operator and aligned with the two bollards on the right. C. Ineffective Safeguards 15. Ineffective safeguards in this incident included using a filtration strainer packed with steel wool as an inadequate substitute for an engineered flame arrestor and a pump start-up procedure that required bypassing the run-dry safety interlock when needed most. 16. The failure of these safeguards allowed the nitrous oxide decomposition reaction to propagate to Trailer 182 and explains why the Airgas employee was located near the pump start switch at the time of the explosion. The equipment design required the operator to bypass the safety interlock until the pump achieved an adequate flow rate.

  1. Flame Arrestors

a) Background 17. Flame arrestors protect people and equipment from fires and explosions.120 A flame arrestor is a safety device that “allows gas to pass through it but stops a flame in order to prevent a larger fire or explosion.”121 18. The International Organization for Standardization (ISO) defines flame arrestors as “safety devices fitted to openings of enclosures or to pipe work and are intended to allow flow but prevent flame transmission.”122

120 See [2] at page 38. 121 See ENARDO Flame Arrestor Technology [28]. 122 See ISO 16852:2016 [29].

CSB • Investigation Report • Airgas • Cantonment, Florida 47 19. A variety of different approaches to flame arrestor designs exist, but each is based on the general idea of cooling the vapor to stop the reaction from continuing. One source states: The technique often used in flame arrestors is to cool the propagating flame or explosion enough to extinguish the fire. Thermal mass, usually in the form of metal, is used to extract enough energy from the reacting gases that the flame can no longer be supported and is extinguished. Many different arrestor designs are available including gauzes, perforated plates, expanded metal, sintered metal, metal foam, compressed wire wool, loose filling, hydraulic arrestors, stacked plate, and crimped ribbon.123 20. In 2002, the Center for Chemical Process Safety (CCPS) published Deflagration and Detonation Flame Arresters, which provides safety guidance for flame arrestors.124 CCPS states: “Proper application of a flame arrester can help avoid catastrophic fire and explosion losses by providing a flame barrier between at risk equipment and anticipated ignition sources.”125 21. CCPS also notes: “Flame arresters have often failed in practice. There have been significant advances in flame arrester technology over the last decade that explain many ‘failures’ as due to misapplication. Plant inspections have shown that misapplication of flame arresters continues to be common.”126 22. Furthermore, CCPS states: “Flame arresters … can only be proven by tests simulating the conditions of use. The user should ensure that a flame arrester has been properly tested to meet the intended purpose, and should be prepared to stipulate the required performance standard or test protocol to be followed.”127 23. The Institution of Chemical Engineers (IChemE) is a global professional organization.128 In a published flame arrestor guidance document, IChemE describes the importance of testing flame arrestors in the environment they are being used. IChemE states: [I]n testing a flame arrester the environment in which it will be used must be taken into account. It cannot be assumed that because a flame arrester has been tested and passed for use in one environment it will perform equally well in all environments. With our present incomplete understanding of the mechanism of operation it is necessary to simulate as closely as possible in the tests the environment in which it will be used.129 24. CGA G-8.3–2016, Safe Practices for Storage and Handling of Nitrous Oxide, allows strainers to serve as a flame arrestor. CGA states “Strainers should be installed on the suction and discharge of

123 See [2], Section 1.6.1.3. 124 See Deflagration and Detonation Flame Arresters [101]. 125 See [101], Section 3.1. 126 Id., at Section 3.1. 127 Id., at Section 3.1. 128 See IChemE Website [30]. 129 See Performance Requirements of Flame Arresters in Practical Applications at page 56 [79].

CSB • Investigation Report • Airgas • Cantonment, Florida 48

liquid pumps to provide a heat sink that assists in quenching a decomposition flame front.”130 The standard provides no basis, however, to conclude that such a device could serve as an effective safeguard. Furthermore, no specifications are provided with respect to engineering standards such as strainer hole size or screen mesh size. 25. An Airgas technical employee participated in the development of an earlier version of CGA G-8.3. He acknowledged that there was no “rigorous study” backing the CGA safety standard to ensure these strainers could effectively halt a nitrous oxide decomposition reaction. 26. As noted, Smith manufactured the original nitrous oxide pump at the Airgas facility, and that company advises against using strainers as flame arrestors. In the company’s nitrous oxide pump literature, Smith states, “We highly recommend the installation of specially-designed flame arrestors on both sides of the pump (near the inlet and outlet).” The company further states, “It should be noted here that strainers are not designed to break-up flame fronts. The recommended flame-arresting device is a specialty product.”131 27. In published “lessons learned” from a report detailing an incident that appears to be the 2001 Eindhoven incident, European officials stated: “Furthermore, flame arrestors should be placed around the [nitrous oxide] pump.”132 b) Airgas Flame Arrestor 28. Consistent with CGA G-8.3–2016, Safe Practices for Storage and Handling of Nitrous Oxide, Airgas installs y-strainers on the pump inlet and outlet to serve as a “flame arrestor.”133 29. As shown in Figure 30, Airgas also fills the strainer basket with steel wool to create a flame arrestor, with the idea that the steel wool will help quench a potential nitrous oxide decomposition reaction.

130 See [150], Section 5.7. 131 See Pumps for low-pressure nitrous oxide transfer, AL-45 at page 5, [31]. Also, see Flame Arrestor Animation to see an example of an engineered flame arrestor [225]. 132 Major Accident Reporting System - nitrous oxide trailer truck explosion [32]. 133 CCPS also describes the various types of flame arresting elements that are in use. CCPS lists compressed metal wool as a flame arrestor element that is not commercially available in the United States, but is available in the United Kingdom. See [101], Section 3.2.

CSB • Investigation Report • Airgas • Cantonment, Florida 49

Figure 30. Airgas uses strainers filled with steel wool on pump suction and discharge piping to serve as a flame arrestor. Airgas relies on these strainers to prevent a nitrous oxide decomposition reaction from propagating to the trailer being filled, where the reaction could result in an explosion. The left photo shows a y-strainer recovered from the Cantonment site with its cap removed revealing the basket filled with steel wool. The right photo shows a close-up of a different y-strainer basket also recovered from the Cantonment site containing steel wool. 30. When installed in this manner, Airgas technical personnel concluded the y-strainer would act as a “heat sink” and absorb the excess heat to stop a nitrous oxide decomposition reaction, but they also acknowledged, “[t]here is no rigorous study” to support the flame arrestor design. 31. IChemE describes common types of flame arrestors including compressed wire wool, the general type of flame arrestor used by Airgas. Flame arrestor information published by IChemE describes the Airgas flame arrestor design and some of its weaknesses. IChemE states: “As the name [compressed wire wool] implies, these types of matrices are made by compressing a mass of fine wire into an appropriate holder.”134 IChemE then noted that wire wool has a high resistance to flow and is difficult to reliably assemble: Their resistance to flow is high, which limits their applications, particularly as their effectiveness as an arrester increases with the degree of compression. Questions have, however, been asked about the reliability of arresters with this type of matrix in view of the difficulty of reproducing them with any degree of certainty.135 32. At Airgas, the y-strainer basket on the ACD pump discharge is relatively flexible and did not withstand significant differential pressure, such as a pressure wave generated from a nitrous oxide decomposition reaction. Post-incident evaluation of the ACD pump discharge strainer revealed that at some point the strainer basket dislodged from the y-strainer housing and into the downstream piping. (Figure 31 and Figure 32) Since the steel wool installed inside the strainer basket was no

134 See Performance Requirements of Flame Arresters in Practical Applications at page 50 [79]. 135 Id., at page 50.

CSB • Investigation Report • Airgas • Cantonment, Florida 50

longer present, this allowed an open path, through the center of the open strainer basket, for a decomposition reaction to propagate from the pump to Trailer 182.

Figure 31. Post-incident x-ray images of y-strainers. An x-ray of the ACD pump discharge strainer (left) shows that the mesh basket dislodged into the downstream piping. The image on the right is the y-strainer from the Trailer 182 Cryostar pump discharge strainer and illustrates what an x-ray looks like when the strainer basket is in the proper location.

Figure 32. Photos of the ACD pump discharge y-strainer. The left photo shows the strainer basket location as seen with the y-strainer cap removed. The basket dislodged from the housing and was located in the downstream piping creating an open path to Trailer 182. The photo on the right is the strainer basket from the ACD pump discharge y-strainer removed from the y-strainer housing, post-accident. 33. During post-accident investigation activities, CSB investigators and Airgas contractors found a metal fragment located in the ACD pump outlet piping downstream of the flame arrestor. (Figure 33) The fragment showed physical discoloration. The discoloration may be consistent with heating

CSB • Investigation Report • Airgas • Cantonment, Florida 51 from a decomposition reaction.136 The presence and condition of this metal fragment further supports the CSB’s overall conclusion that the ACD pump likely initiated a nitrous oxide decomposition reaction that propagated through the open y-strainer basket and into Trailer 182.

Figure 33. Photo of heated metal fragment. This metal fragment located in the ACD discharge piping downstream of the flame arrestor (y-strainer) shows discoloration that may be consistent with heat from a nitrous oxide decomposition reaction. The scale for the left and right photos is three millimeters and one millimeter, respectively. 34. After filling a y-strainer with steel wool and putting the device in use, Airgas did not inspect the y- strainer to ensure it can function as intended as part of a preventive maintenance program. Post- incident evaluation of the ACD pump suction strainer revealed the strainer basket to be partially empty. (Figure 34) The combination of small particles of material in the pump suction line, missing steel wool, and discolored steel wool in the strainer basket together suggest that the steel wool may have deteriorated.

136 Color variations on metal are the effect of various thicknesses of oxide films that form when heated in an oxidizing environment, such as air, nitrous oxide, or oxygen. See [3], page 523. .

CSB • Investigation Report • Airgas • Cantonment, Florida 52

Figure 34. Photo of y-strainer basket from the inlet piping to the ACD pump. The left side of the basket is inserted the furthest into the y-strainer.

Figure 35. Photo showing the top end of the ACD pump suction piping y-strainer basket with missing and discolored steel wool. 35. CGA nitrous oxide safety standards do not require testing to confirm flame arrestors will be effective. Likewise, Airgas did not conduct any testing to confirm that a y-strainer filled with steel wool can actually halt a nitrous oxide decomposition reaction. The company also lacks a standard for the design of the strainer, the screen mesh size, or the grade or quantity of steel wool installed. (Figure 36)

CSB • Investigation Report • Airgas • Cantonment, Florida 53

Figure 36. Strainers used by Airgas. Airgas lacked an engineering standard for strainers used as a flame arrestor. The company used a variety of strainer designs at Cantonment. Airgas used these strainers as a flame arrestor to stop a potential nitrous oxide decomposition reaction from propagating past the strainer to prevent a trailer truck or storage tank explosion. 36. The Airgas manufacturing manual includes a section describing the nitrous oxide trailers used to transport nitrous oxide to its customers. This document includes a description of the flame arrestors and states: “Flame arrestors shall be installed at the suction and discharge side of each trailer pump. A standard Y-strainer may act as a flame arrestor. The Y-strainer will be loosely packed with brass or stainless steel wool (do not use steel wool).” 37. Although written for the trailer pumps, Airgas also uses this flame arrestor approach for the transfer pumps. Though the manual says not to use steel wool inside the y-strainers, Airgas personnel stated that they do use steel wool inside the nitrous oxide transfer pump y-strainers. Airgas does not have documentation explaining the warning not to use steel wool, whether in the manual or any other corporate documents provided to the CSB. 38. While the Airgas manufacturing manual says the y-strainer will be loosely packed with brass or stainless steel wool, Airgas personnel told CSB investigators that they “completely pack” the y- strainer with steel wool. The company does not have documentation that explains what “loosely packed” means or how to pack the y-strainer with steel wool. Airgas also lacks specifications for the strainer hole or mesh size and the type or quantity of the steel wool. 39. Airgas personnel did not know the basis for using a y-strainer as a flame arrestor; however, it may date back to explosion tests conducted after the 1980 trailer explosion at the Richmond, California facility. The CSB obtained a copy of the Puritan-Bennet investigation report from Airgas. In this report Puritan-Bennett concluded: The use of a steel strainer and one and one-half inch diameter pipe downstream of the strainer effectively stops the propagation of the explosion. This was proven during two tests by samples analyzed via gas

CSB • Investigation Report • Airgas • Cantonment, Florida 54

chromatography. More convincingly, one piece of cotton downstream of the strainer failed to burn when a similar piece placed upstream of the strainer on the side that was heated by the torch, was consumed by the reaction of nitrous oxide.137 40. The Puritan-Bennett investigation report noted: “Additional testing will be necessary to determine the effectiveness of the quenching action.”138 There is no evidence showing Puritan-Bennett performed this “additional testing.” In addition, the report did not provide any details on the strainer hole or mesh size used in these tests, and Puritan-Bennett did not develop an engineering design standard for internal use. Furthermore, these strainers did not contain steel wool during testing. 41. Based upon the available evidence, the CSB could not determine if the presence of steel wool contributed to the incident; however, Airgas lacks a technical basis to support using steel wool to stop a nitrous oxide decomposition reaction. Assuming some strainers alone can stop the propagation of the reaction, packing steel wool inside the strainer might defeat the purpose of the strainer and instead support the propagation of nitrous oxide decomposition. Steel wool supports combustion in air and burns even hotter in oxygen. (Figure 37) In a nitrous oxide decomposition environment, steel wool would burn hotter than in air, but less vigorously than in oxygen.139 Thus, heating the steel wool could conceivably initiate a nitrous oxide decomposition reaction on the protected (downstream) side of the flame arrestor.

137 See [20] at page 158. 138 Id., at page 169. 139 Nitrous oxide has an oxypotential of 0.6. Oxypotential is a “Dimensionless number that indicates the oxidizing power of a gas compared to pure oxygen. The oxypotential value of 100% oxygen is 1.0 and air is 0.21.” See AIGA - Safe Practices for Storage and Handling of Nitrous Oxide, Section 4.3.1 [215].

CSB • Investigation Report • Airgas • Cantonment, Florida 55

Figure 37. Video images of steel wool combustion. The photo on the left shows steel wool burning in air140 and the photo on the right shows steel wool combustion in oxygen.141 42. The steel wool used at Airgas is a coarser grade than the steel wool used in these videos (See footnotes 140 and 141). When tested by the CSB, combustion of the Airgas steel wool proved more difficult to sustain than the combustion shown in these videos. c) Special Flame Arrestor Design and Testing Needed 43. The CSB could not locate any safety standards that apply to using flame arrestors to stop self- decomposing chemicals, such as nitrous oxide. Existing flame arrestor testing standards, such as ISO 16852:2016 Flame arresters -- Performance requirements, test methods and limits for use, are based on combustion reactions in air, such as burning propane in air.142 As such, ISO 16852:2016 does not apply to “flame arresters used for explosive mixtures of vapours and gases, which tend to self-decompose [e.g., acetylene] or which are chemically unstable,” such as nitrous oxide.143, 144 44. For most combustion-based flame arrestors, “the flame arrester element itself experiences very little warming, because it is subjected to a high temperature for an extremely short period of time — a few microseconds.”145 45. This short heating duration, however, may not apply to nitrous oxide decomposition where the heat source, such as heat generated by a pump, might continue to heat the flame arrestor element until a safety interlock can detect the heat and stop the pump. If there is a prolonged heat source at the inlet of the flame arrestor, the flame arrestor itself will increase in temperature, and it may reach the

140 See video of steel wool burning in air [226]. 141 See video of steel wool combustion in oxygen [95]. 142 See ISO 16852:2016 [29]. 143 Id. 144 Acetylene can also decompose explosively, but commercial flame arrestors are available for acetylene. See Protego: Acetylene Applications [94]. 145 See Protect Your Process with the Proper Flame Arresters at page 20 [33].

CSB • Investigation Report • Airgas • Cantonment, Florida 56

decomposition threshold temperature limit. This could allow a nitrous oxide decomposition reaction to propagate downstream and result in an explosion. 46. In an article published in 1986, IChemE described how continual heating of a flame arrestor could cause the safety device to fail. IChemE states: A possibility that up to now has only been briefly mentioned is the failure of an arrester due to continuous burning on the matrix. If there is a continuous flow of flammable gas from the downstream side of an arrester to the upstream side (remember the sides are defined in terms of the direction of flame propagation) then even though the arrester prevents flame propagation initially a flame may stabilise on the upstream side. The arrester could eventually fail by the flame literally burning through the matrix or the matrix becoming hot enough to ignite the gas on the other side.146 47. The unique flame arrestor application needed to stop the propagation of a nitrous oxide decomposition reaction may require special design and testing to ensure the device will be effective in the specific application. Air Liquide should complete this testing and design work.

  1. “Run-Dry” Safety Interlock

Airgas equipped the nitrous oxide transfer system used to load trailer trucks with an automatic shutdown to prevent the pump from running dry – a run-dry safety interlock. The company uses this protection system to prevent an explosive nitrous oxide decomposition reaction. It consists of a flow meter downstream of the pump, which will stop the pump motor if the flow drops below 15 gallons per minute. 49. To start a pump with this type of shutdown design, a delay or override is necessary to allow the pump to achieve 15 gallons per minute of flow before the interlock is functional. Airgas workers stated that this is accomplished by holding down two buttons at the pump’s start switch, which overrides the shutdown as long as the operator is physically present to push those buttons. 50. When the operators visually verify that the pump flow is greater than 15 gallons per minute, they can remove their hand from the start and bypass buttons and the pump will continue to run. If flow drops below 15 gallons per minute, the pump will stop. 51. Airgas employees described the nitrous oxide pump interlock system to the CSB. Their description indicates that the Airgas system does not meet the safety guidance of CGA G-8.3–2016, Safe Practices for Storage and Handling of Nitrous Oxide. While Airgas installed the system with low- flow protection, which automatically stops the pump motor if the downstream flow meter detects

146 IChemE uses “matrix” as an alternate term for a flame arrestor element. At Airgas, the “matrix” would include both the strainer basket and the steel wool. See Performance Requirements of Flame Arresters in Practical Applications at pages 55-56 [79].

CSB • Investigation Report • Airgas • Cantonment, Florida 57 low-flow, this safety interlock is not equipped with required pump temperature protection.147 As a result, the pump could be started – or continue to run – at hot temperatures. 52. In addition, the safety interlock is not robust since it lacks redundancy and is thus susceptible to single points of failure.148 A single flow meter is used for both the safety interlock and for the operator to monitor trailer loading. Furthermore, the low-flow interlock uses a single set of electrical contacts to stop the pump motor. 53. Although Air Liquide issued emergency safety guidance following the 2012 Moncada explosion that included corporate safety interlock requirements for nitrous oxide pumps, the pumps at Cantonment did not have this safety protection. Additional safety measures included fail-safe instrumentation, a permissive interlock to ensure proper cool-down, and temperature instrumentation to detect overheating and shutdown the pump. a) Safety Instrumented Systems and ISA-84 54. The International Society of Automation (ISA) develops consensus standards for, among other things, safety instrumentation. ISA84, Electrical/Electronic/Programmable Electronic Systems (E/E/PES) for Use in Process Safety Applications is the ISA committee that developed a three-part series of standards to help companies safely control hazards.149 In describing its safety instrumentation standards, ISA84 states: This three-part series gives requirements for the specification, design, installation, operation, and maintenance of a safety instrumented system so that it can be confidently entrusted to place and/or maintain a process in a safe state. Through its working groups, ISA84 has also developed several key technical reports to provide guidance on the implementation and use of the three-part series of standards.150 55. ANSI/ISA-84.00.01-2004 Parts 1-3 (IEC 61511 Mod), Functional Safety: Safety Instrumented Systems for the Process Industry Sector (“ISA-84”) is the industry standard for safety instrumented

147 One Airgas employee informed the CSB that the company’s discharge flow meter, approximately 20 to 30 feet downstream of the pump is equipped with a high temperature shutoff at 59.69 °F. The company, however, did not provide documentation indicating this programmable option was in effect or explain how a downstream temperature indicator could ensure effective low temperature protection given that when the pump is cooled down and started, no flow is initially present through this flow meter. 148 See Safety controls, alarms, and interlocks as IPLs [34]. 149 See Understanding ISA 84 [35]. 150 See ISA84 Committee website [36].

CSB • Investigation Report • Airgas • Cantonment, Florida 58

systems (SIS).151 “Interlock” is a common name for a safety instrumented system. ISA-84 provides a life-cycle approach to ensure interlocks achieve desired risk reduction of the hazard.152 56. ISA-84 “applies to a wide variety of industries within the process sector including chemicals, oil refining, oil and gas production, pulp and paper, non-nuclear power generation[.]”153 57. OSHA identified ISA-84 as recognized and generally accepted good engineering practice (RAGAGEP) in 2000154 and reaffirmed its position in 2005.155 58. OSHA also addressed the importance and broad application of the ISA-84 safety instrumentation standard – including chemical manufacturing processes that are not covered by the Process Safety Management (PSM) regulation, such as nitrous oxide manufacturing. OSHA stated: It is also important to note that there are a large percentage of processes which are not covered by PSM which may include SIS [safety instrumented systems] covered by S84.01. The employer may be in violation of the General Duty Clause, Section 5(a)(1) of the OSH Act, if SIS are utilized which do not conform with S84.01 and hazards exist related to the SIS which could seriously harm employees.156 59. Although OSHA stressed the importance of applying ISA-84 to processes not covered by the PSM standard, Airgas did not apply the ISA-84 safety standard to the nitrous oxide pump run-dry safety interlock system. This interlock is critical to prevent a nitrous oxide decomposition reaction from high pump temperature. By applying ISA-84, Airgas could have reduced the risk of the pump starting a decomposition reaction. 60. As part of its life-cycle approach to safety, ISA-84 requires periodic testing of safety interlocks to confirm the system is functional.157 61. Airgas performs an annual test of its run-dry safety interlock; however, the company does not have a testing procedure, and the method employees use to confirm that the safety system is functional creates unnecessary danger to workers because it could initiate an explosion. 62. Airgas tests the run-dry interlock with the pump running during the actual loading of a trailer. An Airgas employee will slowly close the inlet block valve to the pump until the flow drops below the

151 See ISA 84 - The Standard for Safety Instrumented Systems [139]. The precise name of the three standards is: (1) ISA- 84.00.01-2004 Part 1 (IEC 61511-1 Mod) Functional Safety: Safety Instrumented Systems for the Process Industry Sector - Part 1: Framework, Definitions, System, Hardware and Software Requirements, (2) ISA-84.00.01-2004 Part 2 (IEC 61511-2 Mod) Functional Safety: Safety Instrumented Systems for the Process Industry Sector - Part 2: Guidelines for the Application of ANSI/ISA-84.00.01-2004 Part 1 (IEC 61511-1 Mod) – Informative, and (3) ISA-84.00.01-2004 Part 3 (IEC 61511-3 Mod) Functional Safety: Safety Instrumented Systems for the Process Industry Sector - Part 3: Guidance for the Determination of the Required Safety Integrity Levels – Informative. See ISA-84 Standards at pages 1 and 2 [220] 152 See ISA 84 - The Standard for Safety Instrumented Systems [139]. 153 See ISA-84 2004 Part 1 at pages 16-17 [37]. 154 See 2000 OSHA Interpretation Letter - ISA-84 [133]. 155 See 2005 OSHA Interpretation Letter - ISA-84 [134]. 156 See 2000 OSHA Interpretation Letter - ISA 84 [133]. 157 See presentation on ISA-84 life cycle [38].

CSB • Investigation Report • Airgas • Cantonment, Florida 59 set point and the pump shuts down. In describing the approach Airgas uses to test the safety interlock, one employee explained: We would pump from a storage tank to a trailer to put it under normal operation and I’ll start pinching back on the suction to the pump and I’ll just sit there and watch the meter and it’ll slowly…the gallons per minute will start to slowly decrease and once it gets to 15 gallons a minute, it should shut off. 63. This is a high-risk approach to testing the interlock. To determine if the safety device is functioning, the company’s test creates the exact highly hazardous circumstances this interlock should prevent. 64. Closing the inlet block valve during trailer loading can cause vapor formation in the pump inlet, resulting in the pump running dry, and could initiate an explosive nitrous oxide decomposition reaction. As demonstrated by the nature of the physical damage to the Airgas facility at Cantonment, a potential nitrous oxide decomposition reaction unnecessarily puts workers conducting such testing at great risk. 65. Airgas should apply ISA-84 and develop a new procedure for testing safety interlocks that evaluates and controls process safety hazards. Alternative approaches could allow for testing the run-dry interlock without creating the risk of an explosion. For example, some of the flow can bypass around the flow meter such that full system flow to the trailer continues, but then begin gradually reducing flow through the meter to verify that the low-flow set point will function as designed and turn off the pump. Such an approach can verify the instrumentation is functional without initiating the actual low-flow condition that can initiate an explosive nitrous oxide decomposition reaction. D. Nitrous Oxide Loading Pump System Design 66. Airgas did not have an appropriate focus on process safety. Many engineering issues existed at Cantonment that contributed to an increased likelihood for pumps to run dry, generate heat, and start a nitrous oxide decomposition reaction. These issues include:  Reliance on equipment manufacturers to perform pump system engineering;  Providing incorrect process data to pump manufacturers;  Not following pump manufacturer recommendations;  Lack of a preventive maintenance program for nitrous oxide pumps;  Not ensuring an adequate minimum storage tank level; and  Lack of automatic process control for trailer truck loading.

CSB • Investigation Report • Airgas • Cantonment, Florida 60

Since 2014, Airgas used pumps from three different manufacturers – Smith, Cryostar, and ACD to load trailers at the Cantonment facility. a) Smith Precision Products

According to the Puritan-Bennett explosion investigation report, the Smith positive displacement gear pump had “been the industry's choice for many years.” The CSB learned that Smith supplied the nitrous oxide industry with gear pumps for about 55 years.

Dry running of a Smith nitrous oxide pump contributed to the 1980 nitrous oxide explosion in Richmond, California. Puritan-Bennett was using the Smith gear pump as its standard nitrous oxide pump at all of the company’s facilities, and it used a Smith pump when constructing the Cantonment, Florida nitrous oxide facility.

Through 2014, all North American nitrous oxide facilities used Smith pumps to move nitrous oxide and load nitrous oxide trailers. In addition, trailers were also equipped with Smith pumps to unload nitrous oxide at customer facilities.

In 2014, Smith notified its nitrous oxide pump customers that the company made a business decision to no longer manufacture its pump for nitrous oxide service.158 As a result, Airgas began a process of finding a suitable pump to replace its fleet of Smith pumps. b) Cryostar

Although using the Smith pump was the basis for nearly all of the company’s experience with nitrous oxide transfer operations, Airgas did not perform a hazard review or management of change when the company designed, installed, and began using the Cryostar centrifugal pump.

In June 2014, Airgas ordered a Cryostar centrifugal pump to use as a potential replacement to its fleet of Smith pumps.

Airgas installed this Cryostar pump in parallel to the existing Smith pump and planned to use it for loading trailers and shipping containers at the Cantonment facility.

In January 2015, Airgas loaded its first trailer with the Cryostar pump. Company email communications indicate that the pump performed well and decreased trailer loading time because the Cryostar pump provided a larger flow rate than the Smith pump. But the Cryostar pump soon developed mechanical seal reliability problems and by March 2015, two mechanical seals failed. Based on pump manufacturer literature and pump usage history at Airgas, a mechanical seal for these pumps should last 12 to 18 months. 158 Smith stopped producing their pump for economic reasons and not because of nitrous oxide safety concerns.

CSB • Investigation Report • Airgas • Cantonment, Florida 61 76. The short (30-day) average life for these mechanical seals at Airgas resulted from operating conditions being significantly different from design conditions reported by Airgas. Cryostar records indicate that Airgas provided incorrect process data during the pump selection process and the mechanical seal was not operating within design parameters. Multiple process conditions were not accurate, including temperature, pressure, and density of the liquid nitrous oxide. When Airgas provided Cryostar with more accurate process conditions, Cryostar provided a different mechanical seal that corrected the mechanical seal reliability problem. c) ACD 77. Cryostar manufactured its pump in France and obtaining pumps and parts took longer than Airgas desired. During the period of Cryostar reliability problems, Airgas bought a centrifugal pump from a company called ACD, manufactured in California. 78. In the summer of 2015, Airgas replaced the Cryostar pump installed at the Cantonment, Florida facility with the new pump from ACD. Airgas employees informed the CSB that the ACD pump performed well. As a result, the company did not perform maintenance, inspection, or repairs after installing the ACD pump. 79. According to the ACD pump manual, the mechanical seal requires annual replacement, which was due around the time of the August 28, 2016 incident. Because Airgas did not have a preventive maintenance program for the ACD pump, there was no replacement plan for the mechanical seal. 80. Airgas workers all said they use the ACD pump and not the Smith pump to load trailers because the ACD pump outperformed the Smith pump. As a result, the company used the ACD pump to load nearly all nitrous oxide trailers at the Cantonment facility from September 2015 to the incident on August 28, 2016. (Figure 38) There is no indication that the Smith pump operated on the day of the incident.

CSB • Investigation Report • Airgas • Cantonment, Florida 62

Figure 38. Post-incident photo showing the ACD pump inlet and outlet piping to the trailer loading piping. The explosion breached the discharge piping system and drained the remaining nitrous oxide in the storage tank to atmosphere. The frost line on the equipment shows this flow exited through the ACD pump. The discharge of the Smith pump (yellow oval) is not frosted and the discharge valve is closed. 81. Airgas did not perform an engineering evaluation of the ACD pump and instead Airgas “let the vendor do that.” In reviewing communication records between Airgas and ACD, however, the CSB identified no communications that suggested ACD performed an engineering evaluation of the Airgas nitrous oxide transfer pump. Rather, all communication supported the traditional vendor role – supply equipment to meet the customer process conditions and needs with no agreement or understanding as to an engineering evaluation role for ACD. 82. In specifying process conditions for the ACD pump, Airgas provided erroneous information to ACD, but some information was different from the information the company provided to Cryostar. Process conditions including fluid density and operating temperature were still not accurate. 83. Airgas specified the fluid density as 10.7 pounds per gallon, which is higher than for the normal nitrous oxide density of about 8.7 pounds per gallon. The specified density matches the density of liquid nitrous oxide at -127 °F and atmospheric pressure.159 Although these conditions may reflect the initial startup conditions, they are not consistent with the normal pump inlet pressure Airgas provided to ACD of 240 to 300 pounds per square inch gauge (psig). 84. Although the ACD pump looked similar to the Cryostar pump, there were significant differences between them. For example, the ACD pump required more than two additional feet of liquid height to prevent developing vapor within the pump.160 This additional, required pressure increased the

159 See Thermodynamic Properties of Saturated Nitrous Oxide [113]. The specified density was 1.281 kilograms per liter, which is equivalent to 79.97 pounds per cubic foot. 160 Pump manufacturers express the required inlet liquid pressure as feet of net positive suction head (NPSH). The required NPSH for the ACD pump is 3.52 feet, 2.7 times larger than the 1.3 feet of NSPH required for the Cryostar pump. Having a

CSB • Investigation Report • Airgas • Cantonment, Florida 63 likelihood for the pump to run dry, generate heat, and start a nitrous oxide decomposition reaction. Although required by CGA G-8.3–2016, Airgas did not evaluate this difference in inlet pressure requirements or make any process modifications to ensure the ACD pump received adequate inlet liquid pressure.161 As a result, the ACD pump was more likely to run dry, generate heat, and initiate a nitrous oxide decomposition reaction.

  1. Pump Recycle Piping

Both the ACD and Smith pumps have a relief valve on the pump outlet piping that can circulate flow back to the suction piping. Figure 39 shows the relief valve on the ACD pump outlet piping. Airgas equipped the Smith pump with a similar relief valve. Post-incident testing revealed that the ACD pump relief valve leaked, but did lift at its set pressure, a differential pressure across the relief valve of 40 psig.162 By design, the normal differential pressure of the ACD pump was 60 psig. Because the normal ACD pump outlet pressure exceeds the set pressure of the relief valve, the relief valve was probably open and a significant circulation of flow from the pump outlet to the pump inlet likely occurred.

Figure 39. Photo of the ACD pump relief valve (blue oval). Post-incident testing showed that this valve likely circulated nitrous oxide back to the pump inlet. Due to the low temperature of the nitrous oxide (about -10 °F), this piping is insulated. This photo shows the piping after removal of the insulation. 86. Airgas configured the relief valve piping on the ACD pump similar to what Smith says not to do.163 Centrifugal pumps, such as the ACD pump, add heat to the process fluid as the fluid flows through the pump. This heat increases the liquid temperature. Thus, the temperature of the nitrous oxide exiting the ACD pump will be higher than the temperature of the nitrous oxide entering the pump.

significantly higher NPSH requirement increases the potential for vapor generation in the pump. The Cryostar and Smith pumps had similar NPSH requirements. 161 See [150], Section 8.2. 162 The Smith pump relief valve was also tested post-incident. Although it had a set pressure of 40 psig, the relief valve leaked, but never lifted, even at 50 psig of inlet pressure. 163 See Smith pump - Do's and Don'ts at pages 15 and 16 [39].

CSB • Investigation Report • Airgas • Cantonment, Florida 64

As a result, the nitrous oxide circulation through the relief valve should increase the fluid temperature and could generate vapor in the pump inlet piping. (Figure 40) To avoid vapor in the pump inlet piping, a better design is to direct the relief valve outlet back to the storage tank, away from the pump supply nozzle.

Figure 40. Schematic from Smith pump literature illustrating an improper piping design. Airgas configured the relief valve piping on the ACD pump similar to what Smith says not to do. 87. CGA G-8.3–2016 supports designing nitrous oxide pumps to startup with return piping back to the storage tanks. The standard states: Best practice for liquid transfer pumps is to install the pump with a flooded suction line and a liquid return connection to help quench a decomposition reaction.164

  1. Instrumentation to Monitor Pump Performance

While both Cryostar and ACD recommended specific instrumentation to monitor pump performance such as pump inlet pressure and temperature, pump outlet pressure and temperature, and pump differential pressure, Airgas did not follow these recommendations. Furthermore, Airgas lacks documentation showing the company considered these manufacturer recommendations.

  1. Mechanical Seal – A Continual Source of Heat

Industry standards and historical incidents (Richmond, Eindhoven, and Moncada) show that inadequate liquid supply to an operating pump is a potential cause of a nitrous oxide explosion. An operating pump generates heat and without enough liquid flow the temperature of pump

164 See [150], Section 5.7.

CSB • Investigation Report • Airgas • Cantonment, Florida 65 components increases. At times, nitrous oxide industry pumps have developed enough heat to initiate explosions. 90. In the design of the Cryostar pump piping system, Airgas did not account for the pressure drop across y-strainers stuffed with steel wool that the company used as a flame arrestor. While a clean y-strainer may have low-pressure drop, a y-strainer “completely packed” with steel wool is more restrictive. Industry y-strainer literature for one manufacturer indicates a clogged y-strainer can increase pressure drop by a factor of 10.165 Airgas did not evaluate the effect these devices could have on pump operation. The presence of these flame arrestors could partially vaporize the liquid nitrous oxide entering the pump and result in dry running and thus elevated temperature conditions, which could start a decomposition reaction. 91. Airgas did not perform an engineering analysis or install instrumentation, such as pressure or differential pressure indication, to ensure that using a y-strainer filled with steel wool on the pump suction piping would not result in dry running conditions. Industry literature describes potential problems with clogged strainers on centrifugal pump performance.166, 167 One source states, “… any benefit of a suction strainer is far outweighed by the risks, which can lead to pump failures and other system problems.”168 92. The ACD pump is a close-coupled design that uses the motor bearing to support the pump shaft. (Figure 41) This design eliminates the need for a pump bearing that could potentially overheat and trigger a nitrous oxide decomposition reaction.

165 See Mueller y-strainer pressure drop chart [40]. 166 See Suction Pipeline Design [42]. 167 See Oil and Gas Processing discussion of pump suction strainers [43]. 168 See Are suction strainers necessary on centrifugal pumps [44].

CSB • Investigation Report • Airgas • Cantonment, Florida 66

Figure 41. Schematic of a typical close-coupled pump.169 Although this is not an ACD pump, it is similar and illustrates how the motor shaft can directly turn the pump impeller without an additional pump shaft and bearing. 93. Due to the close-coupled pump design, the only continual source of heat within the ACD pump is the mechanical seal. As a result, the mechanical seal is the most likely heat source to start an explosive nitrous oxide decomposition reaction. 94. The rotating and stationary surfaces of a mechanical seal require cooling and lubrication to prevent heat, wear, and failure. By design, the mechanical seal installed in the ACD pump relies on the liquid nitrous oxide to cool and lubricate the seal faces. During dry running conditions, the lack of liquid nitrous oxide can generate significant heat due to insufficient cooling and lubrication of the mechanical seal faces. “Dry running as result of inadequate lubrication … during operation, leads to massive temperature increases and possible damage to the sliding faces and secondary seals.”170 95. Although in most equipment applications this heat generation is a concern for reliable seal operation, in nitrous oxide pumps, an unlubricated mechanical seal is a potential source of heat that can trigger an explosive nitrous oxide decomposition reaction. Because the Airgas ACD pump outlet connection is 1.5-inch and the piping is 2-inch, temperatures as low as 50 °F may be enough to sustain a nitrous oxide decomposition reaction. (Figure 42)

169 See close-coupled pump [227]. 170 See Eagle Burgmann Brochure - Mechanical Seal Technology and Selection at page 11 [41].

CSB • Investigation Report • Airgas • Cantonment, Florida 67

Figure 42. CGA Propagation threshold for nitrous oxide decomposition reaction at the ACD pump conditions.171 The red oval shows the temperature needed to sustain propagation of a nitrous oxide decomposition in the ACD pump at Airgas. Although not measured, typical operating pressure in the ACD pump is likely in the range of 265 to 330 psia. At this pressure and with the piping used at Airgas, the temperature needed to sustain a nitrous oxide decomposition is in the range of 50 to 125 °F. Figure 9 shows the full CGA nitrous oxide propagation threshold chart. 96. An explosive nitrous oxide decomposition reaction does not require a significant increase in temperature. CGA states, “Temperatures above 300 °F (150 °C) shall be avoided by all practical means to reduce the likelihood of an explosive decomposition of the nitrous oxide.”172 97. The guidance provided by CGA to avoid temperatures above 300 °F does not align with Figure 42, which shows that once the reaction is initiated, temperatures as low as 50 °F can propagate a nitrous oxide decomposition reaction at the ACD pump conditions. CGA should clarify its temperature guidance in light of the Airgas incident. 98. Following a physical inspection of the ACD pump mechanical seal after the incident, the technical representative from the seal manufacturer stated that the seal showed signs of wear and dry running. (Figure 43 and Figure 44)173 99. In addition, the CSB contracted with an engineering consultant to evaluate the mechanical seal from the ACD pump. The engineering contractor confirmed the blue coloring (top right photo in Figure 43) and the surfacing cracking (bottom right photo in Figure 43) are consistent with heat that is likely the result of poor lubrication from dry running conditions.174

171 See [150], Section 4.3.3.3. 172 Id., at Section 5.7. 173 Figure 43 and Figure 44 come from a report on metallurgical testing results developed by a consultant that functioned as a third party laboratory for all relevant parties. This consultant provided testing results, but not analysis. 174 The CSB’s engineering consultant also noted that the y-strainer filled with steel wool would make dry running more likely and that the uninsulated pump casing and heat from the totally enclosed fan cooled (TEFC) motor would also provide heat to the pump. This animation shows how a TEFC motor cools itself, but could provide additional heat to an attached pump.

CSB • Investigation Report • Airgas • Cantonment, Florida 68

Figure 43. ACD Pump Mechanical Seal Rotating Face. The scale for these images is 1/16-inch (left), 0.005- inch (top right), and 30-micrometers (bottom right).

  1. The CSB’s engineering contractor also noted that the chipping of the carbon stationary seal face

that is shown in the left photo of Figure 44, at Location #6, is consistent with separation of the mechanical seal faces from excessive vaporization. When the faces forcefully come back together, the softer carbon face can crack or chip.

Figure 44. ACD Pump Mechanical Seal Stationary Face. The scale for these images is 1/8-inch (left), 5- millimeters (top right), and 300-micrometers (bottom right).

  1. The mechanical seal from the ACD pump shows physical damage consistent with dry running

conditions that are likely the result of process conditions not meeting pump manufacturer requirements, such as the pump inlet pressure. In addition, the physical evidence indicates that at times, the mechanical seal operated at high temperature conditions that are likely sufficient to start a nitrous oxide decomposition reaction.

CSB • Investigation Report • Airgas • Cantonment, Florida 69

  1. Pump Manufacturer Safety Warnings
  2. Of the three nitrous oxide pump brands used by Airgas – Smith, Cryostar, and ACD – only Smith

provides nitrous oxide decomposition safety warnings in its pump literature.175 Among its nitrous oxide safety information, Smith pump documentation states, “great care must be taken to avoid an explosion caused by heat.” 176

  1. Smith company literature also informs users about the potential problems with contamination. The

literature states: Actually, liquefied Nitrous Oxide is listed as a highly confirmed oxidizing agent. One of its chief characteristics is that it readily yields free Oxygen through heat gain decomposition. Therefore, contaminants could cause violent combustion within the confines of the tank and piping system.177

  1. Cryostar pump documentation provides some general nitrous oxide safety information including

physical properties, lack of flammability, odor characteristics, methods for leak detection, and anesthetic and narcotic exposure effect. The company does not provide information about nitrous oxide decomposition hazards.

  1. ACD provides no specific nitrous oxide safety information in its pump manual.
  2. Many equipment manufacturers including ITT, one of the world’s largest pump suppliers and

manufacturer of the Goulds 3196, a common process pump,178 establish a product stewardship program to ensure safety is considered in both product development and in customer use.179

  1. The Product Stewardship Society defines product stewardship as, “Responsibly managing the

health, safety, and environmental aspects of raw materials, intermediate, and consumer products throughout their life cycle and across the value chain in order to prevent or minimize negative impacts and maximize value.”180

  1. Through an effective product stewardship program, nitrous oxide pump manufacturers can play an

important safety role by referencing and reinforcing critical nitrous oxide safety hazards and appropriate precautions to their customers. To help prevent future incidents, Cryostar and ACD should provide nitrous oxide decomposition hazard warnings and refer users to both CGA G-8.3 and this CSB investigation report for additional information on how to prevent catastrophic nitrous oxide explosions.

175 See Smith Precision Pumps nitrous oxide literature [31]. 176 Id. 177 Id. 178 As of 2008, the Goulds 3196 was the most popular process pump in the world. See Goulds 3196 the World's Most Popular Process Pump [45]. 179 See ITT Product Stewardship [46]. 180 See product stewardship definition [96].

CSB • Investigation Report • Airgas • Cantonment, Florida 70

pump and piping are at ambient temperature and cooling is needed to prevent vapor formation within the pump. Forming vapor in the pump can cause the pump to run dry and result in heat generation that may start an explosive nitrous oxide decomposition reaction.

the pump discharge. This action introduces liquid nitrous oxide to the pump, which initiates the cooling process. As the cold liquid contacts the warm piping, some liquid converts to vapor. This vapor exits the piping through the open drain valve and vents to atmosphere. As the piping continues to cool, the amount of vapor decreases and eventually liquid exits the piping through the open drain valve. When the operator sees liquid draining to atmosphere, they close the drain valve.

company instructs operators to look for a frost line to develop on the discharge piping and then ensure that liquid comes out of the outlet piping bleed valve. Airgas operators told CSB investigators the transfer pump would sometimes shut down from low-flow due to lack of adequate cooling when first loading a trailer. When this occurred, operators simply repeated the pump cooling procedure.

cooled. Cooling time is 5-10 minutes for the ACD pump and 15-20 minutes for the Cryostar pump.

also possible and can create additional problems. By reducing the pressure to atmospheric pressure, the liquid in the piping system can be as low as -127 °F.181 Due to this pump cooling approach, the pump and piping can be significantly cooler than the temperature of nitrous oxide in the storage tank, which is approximately 0 to -10 °F.

arrangement that included piping from the pump discharge back to the storage tank, but away from the pump liquid supply line to prevent nitrous oxide vapor from recycling back to the pump during startup.

below.” (Figure 45) The liquid flows out of the pump, and either through a hand valve and back to the supply tank, or through a bypass valve, set at a predetermined differential pressure which avoids overloading the pump, and back to the tank.”182 181 See Thermodynamic Properties of Saturated Nitrous Oxide [113]. 182 See Smith pump - Do's and Don'ts at pages 8 and 9 [39].

CSB • Investigation Report • Airgas • Cantonment, Florida 71

Figure 45. Bypass piping configuration recommended by Smith in its product literature.

  1. Cryostar literature also supports the use of a bypass line to facilitate cool down. The Cryostar

operation manual states, “For faster cool down and for easier start-up a bypass line should be provided.” The Cryostar manual also includes the bypass line as part of the startup procedure and instructs the operator to verify the bypass valve is open before starting the pump. The Cryostar manual also cautions the user not to overcool the pump and further states: “If the pump is overcooled (support arms completely frosted) it should be started only after the shaft has been checked for free rotation.”

  1. Of the three pump manufacturers, ACD provided the least detailed instructions. ACD cautions

users: “Never operate the pump without first cooling down to normal operating temperature.” ACD also cautions users against overcooling, stating: “Never operate the pump if the bearing housing has become excessively cold (frosted over).” a) Worker Exposure to Nitrous Oxide

  1. Airgas procedures require routine venting of nitrous oxide to the atmosphere when workers prepare

to start nitrous oxide pumps and when disconnecting hoses after completing trailer loading. Airgas periodically monitors worker exposure to nitrous oxide and acknowledges that at times worker exposure exceeded established limits.183, 184

  1. Although not prohibited by environmental regulations, venting nitrous oxide to atmosphere during

pump cool down and before disconnecting trailer hoses can expose workers to nitrous oxide

183 The ACGIH exposure limit (threshold limit value) for nitrous oxide is a time weighted average of 50 parts per million. NIOSH established a recommended exposure limit of 25 parts per million. OSHA does not have an established exposure limit for nitrous oxide. See Nitrous Oxide in Workplace Atmospheres [130]. 184 Following the 2007 Scaled Composites explosion, Cal/OSHA cited Scaled Composites for failing to ensure that its “employees were not exposed in excess of the nitrous oxide permissible exposure limit of 50 parts per million.” See Cal/OSHA Investigation File - Scaled Composites Explosion at page 15 [117].

CSB • Investigation Report • Airgas • Cantonment, Florida 72

vapor.185 Since nitrous oxide is a common anesthetic in dentistry and medical treatment, workers could potentially be impaired from exposure to nitrous oxide at relatively low exposure concentrations.186 In addition, the Airgas safety data sheet suggests using engineering controls, such as the pump manufacturer cool down piping arrangement, to control worker exposure to nitrous oxide.187

  1. To control worker exposure to nitrous oxide, CGA G-8.3–2016 recommends, among other things,

“ensuring the filling system is designed so that nitrous oxide is not released into the work environment via venting or leaking.”188

  1. On weekends and during weekday night shifts, only one Airgas employee is present to operate the

process and load nitrous oxide trailers. To monitor the status of lone workers, Airgas purchased a “man down” system to alert responders if an Airgas worker was disabled. Although Airgas procedures required workers to wear this monitoring device when working alone, Airgas employees informed CSB investigators that this system did not work so workers did not wear the monitoring device.

  1. Airgas employees confirmed that company management knew about the problems with the man

down system and were trying to “get it working.” Nevertheless, Airgas continued to assign lone operators on some shifts to load nitrous oxide, where procedures required venting to atmosphere adjacent to where the operators stood. In these circumstances, a worker could be overcome by the effects of the product – or coincidentally could suffer any other serious health or safety emergency accompanied by loss of consciousness – with no ability to call for help or obtain support from coworkers.

  1. To control worker exposure to nitrous oxide, Airgas should modify equipment design and operating

practices to prevent nitrous oxide releases into the work environment from leaking or venting equipment. In addition, as part of its efforts to evaluate overall process safety, the company should evaluate its safety practices when operating the facility with just one employee. b) Flexible Connections between Piping and Pump

  1. Airgas nitrous oxide transfer pumps use stainless steel piping on both the suction and discharge.

The company did not perform piping stress analysis to ensure that initial cool down does not produce excessive stress on the pump, which could adversely affect pump performance and cause the mechanical seal to generate excessive heat.189

185 In its 2015 corporate Sustainability Report, Airgas stated: “Nitrous oxide (N2O) is a greenhouse gas with nearly 300 times the global warming impact of carbon dioxide. Annually, Airgas produces and packages about 30 million pounds of this gas for sale to whipped cream manufacturers, electronics producers, and medical and dental customers.” See Airgas Sustainability Report 2015 [88]. 186 See Nitrous Oxide and the Inhalation Anesthetics [98]. 187 See Nitrous Oxide Safety Data Sheet (SDS) [58]. “Appropriate Engineering Controls: Use only with adequate ventilation. Use process enclosures, local exhaust ventilation or other engineering controls to keep worker exposure to airborne contaminants below any recommended or statutory limits.” 188 See [150], Section 4.4.3. 189 See How Do Plant Pipe Strain Problems Affect My Pumping Systems? [114].

CSB • Investigation Report • Airgas • Cantonment, Florida 73

  1. Although not installed by Airgas, all three of the pump manufacturers (Smith, Cryostar, and ACD)

recommend flexible connectors on the suction and discharge of the pump. The Cryostar manual explains that these flexible connections are to “avoid any transmission of vibrations to the pump or excessive stresses on the pump flanges.” The ACD manual explains, “[s]hort flexible lines at the pump port connections are highly recommended to isolate the piping from any pump vibrations and to compensate for thermal expansion and contraction.”

  1. Airgas does not use these flexible connections on the pumps used to load trailers at the Cantonment,

Florida facility, but the company does use them on trailer pumps used for unloading nitrous oxide at customer facilities. (Figure 53)

  1. Storage Tank Level
  2. Despite the importance of not allowing the nitrous oxide transfer pump to run dry, Airgas never

established or evaluated a minimum required nitrous oxide storage tank level.

  1. The two primary nitrous oxide storage tanks are each equipped with a level transmitter and a weight

scale to allow operators to monitor the nitrous oxide inventory using the process control computer. Although only the level transmitters are shown on the Airgas engineering drawings (Piping and Instrument Diagrams), employees informed CSB investigators that the scale is used to monitor the pounds of nitrous oxide in each tank.

  1. The storage tank scales are not equipped with a low-level alarm. In addition, although the tank

level transmitters include a low-level alarm, the alarm is not useful because the alarm set point is well below the minimum detection capability of the transmitter.

  1. Operators described a common practice of loading a truck as soon as a nitrous oxide storage tank

contained enough liquid inventory to fill it. Airgas relies on its operators to ensure there is an adequate level of nitrous oxide in the storage tank before starting the pump to load a nitrous oxide trailer truck. The company provides no engineering controls to ensure the pump does not run dry due to operating the pump with a low level in the storage tank.

  1. In addition, there are no safeguards to prevent the operator from inadvertently aligning an empty or

near-empty storage tank to the transfer pump. With two nitrous oxide storage tanks that typically supply feed to the loading pump, a near empty storage tank can be lined up to the pump, resulting in a dangerous condition. The operator could be attempting to start and thus bypassing the interlock intended to prevent operating the pump at these conditions. With the interlock defeated, the pump can run dry during startup and trigger an explosion. Some method of differentiating between the tanks should be established to help operators avoid inadvertently aligning an empty or near empty tank, which could cause a pump to run dry and threaten a nitrous oxide decomposition reaction.

  1. The plant manager, however, stated that operators set an alarm on the storage tank level at the

beginning of the trailer truck loading process. To understand how this works, consider a storage tank that contains 40,000 pounds of nitrous oxide. If a tank trailer can hold 36,000 pounds of nitrous oxide, according to the plant manager, an operator could set an alarm on the storage tank to go off when the tank inventory reaches 5,000 pounds, with 1,000 pounds remaining to transfer.

CSB • Investigation Report • Airgas • Cantonment, Florida 74

Although not covered by Airgas procedures, this type of alarm could help ensure the operator is physically present when the 36,000-pound transfer of nitrous oxide into the trailer truck is complete. If set, storage tank alarms should sound in the control room and outside in the plant. During interviews with CSB investigators, however, none of the Airgas operators said they use this alarm system.

  1. While truck-loading operations take place, it is normal for the nitrous oxide manufacturing process

to be operating – producing nitrous oxide product and filling the same storage tank while product flows into a trailer. This simultaneous operation was taking place on the day of the incident. The process was accumulating liquid in Storage Tank 2 – the same tank operators were using to load trailer trucks.

  1. This common practice of simultaneously sending nitrous oxide to and removing nitrous oxide from

the same storage tank makes it unlikely for operators to use the alarm system to monitor trailer truck loading. The simultaneous operation complicates the calculations and makes the alarm system less useful.

  1. Operators stated that the truck loading process is a manual activity with no automatic controls other

than the safety interlock associated with the pump. There is also no level indicator on the trailer truck to indicate how much nitrous oxide is loaded.

  1. Airgas must improve its safety management practices with respect to storage tank and trailer truck

levels in order to control nitrous oxide liquid level and prevent developing heat inside the pump caused by dry running. Such improvements can strengthen the company’s ability to prevent a decomposition reaction and explosion such as the one suffered at Cantonment.

  1. Cantonment Design did not Incorporate Lessons from 1980

Richmond, California Incident

  1. Puritan-Bennett owned the Richmond nitrous oxide manufacturing plant at the time the company

started construction of the Cantonment facility; however, the Cantonment process design did not implement important lessons learned from the 1980 nitrous oxide explosion at the Richmond facility. These lessons, stated below, include potential causes of the August 28, 2016 explosion:190  Provide at least five feet of liquid above the pump to ensure an adequate liquid supply to the pump;  Use both a strainer and a metallic flame arrestor on each side (inlet and outlet) of the pump;  Install a safety interlock to shut the pump motor off when there is low motor load (power consumption); and

190 See [20].

CSB • Investigation Report • Airgas • Cantonment, Florida 75  Construct piping to circulate liquid back to the storage tank during initial starting and cool down of the pump.

  1. By helping to prevent vapor formation and heat generation in the pump, preventing propagation of

a nitrous oxide decomposition reaction, and shutting down the pump when vapor formed, each of these design features could have helped to prevent the August 28, 2016 explosion.

  1. Critical Equipment and Preventive Maintenance
  2. Following the September 2012 Moncada explosion, Air Liquide issued emergency safety guidance

that required nitrous oxide pumps to be included in the company’s critical equipment program. Among other things, this program places special emphasis on associated safety interlocks, maintenance, and operating procedures.

  1. Airgas established a critical equipment procedure applicable to the Cantonment facility. Airgas

states, “nitrous oxide plants … fundamentally require a preventative maintenance program for their safe operation.”

  1. The purpose of this Airgas procedure is “to identify critical equipment, their critical parts and

specifications, and to develop a preventive maintenance inspection and maintenance schedule.”

  1. The company defines critical equipment as “[e]quipment necessary to safely operate a process.”
  2. Airgas defines a critical part as “[a] necessary component of a critical equipment unit that allows

safe operation.”

  1. Although the nitrous oxide loading pump, flame arrestors, and run-dry interlock all meet the Airgas

critical equipment or critical part definitions, none of this equipment is on the company’s list of critical equipment.

  1. Critical equipment is also required to have a preventive maintenance schedule. The policy states:

A schedule shall be developed for each critical equipment unit. The schedule shall indicate the frequency of each maintenance action necessary, to maintain the unit in a safe and operable condition. All frequencies established, shall meet at a minimum, the manufacturer's recommended schedules and all internal Airgas standards.

  1. During the most recent corporate safety audit in May 2016, Critical Equipment received a perfect

score. The Airgas audit, however, looks at whether or not a certain program exists. The audit did not assess the accuracy of the critical equipment list.

  1. As an example, for the critical equipment list, the auditor is asked to evaluate if:

“An inventory of all critical equipment and critical parts is developed and maintained.”

CSB • Investigation Report • Airgas • Cantonment, Florida 76

“A preventive maintenance schedule is developed for each critical equipment unit and addresses each critical part to assure the unit's safe operation. The schedule shall include general equipment listed in this procedure.” “Equipment is provided preventative maintenance according to the developed schedule. Give credit only with supporting documentation.”

  1. As part of efforts to strengthen overall process safety management, Airgas (Air Liquide) should

improve its auditing practices. Robust audits should identify gaps in critical safety programs and ensure the company strengthens these programs. E. Other Possible Causes

  1. Contamination Prevention and Gap in Chemistry Knowledge
  2. Given the history of contamination associated with historical nitrous oxide explosions, the presence

of contaminants and potentially incompatible materials in Airgas equipment, and the company’s limited knowledge of relevant contamination chemistry, the CSB could not rule out contamination as a contributing factor to this incident.

  1. Previous investigations of explosive nitrous oxide decomposition reactions suggest that

contamination may have been causal to two-thirds of the historical incidents, including the 1980 Richmond, California; 2001 Eindhoven, the Netherlands; 2007 Mojave, California; and 2012 Moncada, Spain incidents.

  1. Post-incident equipment evaluation at Airgas identified a number of potential contaminants in

equipment, including many metallic particles. Contaminants such as metal particles can act as a catalyst and may have contributed to the explosion. The CSB found significant degradation of strainers and steel wool. (Figure 45) Many metallic particles collected in downstream equipment, including ball valves. (Figure 46)

CSB • Investigation Report • Airgas • Cantonment, Florida 77

Figure 46. Photos of strainer corrosion and metallic particles. Post-incident evaluation of nitrous oxide pump strainers revealed equipment corrosion and metallic particles. These metallic particles may have acted as a contaminant and could have played a role in the explosive nitrous oxide decomposition reaction.

Figure 47. Photos of metal particles in ball valves. Many metallic particles, including steel wool fibers, collected in equipment downstream of the nitrous oxide transfer pumps.

CSB • Investigation Report • Airgas • Cantonment, Florida 78

provided some warning that the presence of contaminants or catalysts can increase the risk of an explosion during operations, such as nitrous oxide liquid transfer.191 Nonetheless, Airgas did not evaluate its process for potential contaminants and catalysts.

The most important thing to managing reactive chemistry hazards is that you have to have a thorough and complete understanding of your chemistry under design conditions and also under all foreseeable abnormal conditions.192

downstream, and potentially contributed to the incident is lacking. Historically, Airgas never performed testing to understand the effect steel wool, strainer degradation, or the resulting metallic particles may have on promoting nitrous oxide decomposition. As a result, the company’s understanding of nitrous oxide decomposition chemistry was not “thorough and complete.”193

shown in Figure 48, an O-ring located inside a Trailer 182 relief valve reportedly contained butadiene, which may not be compatible with nitrous oxide.194 Post-accident examination indicates that flow through this valve occurred. 191 Scaled Composites published nitrous oxide safety guidelines following its investigation into the causes of the explosion. See Scaled Composites Nitrous Oxide Safety Guidelines [15]. 192 See CSB Safety Video: Reactive Hazards at 18:52 [228]. 193 See CSB Safety Video: Reactive Hazards at 18:52 [228]. 194 Although additional testing is required to confirm, the O-ring may be butadiene rubber. The Parker O-Ring Handbook indicates insufficient data is available to use a butadiene rubber O-ring with nitrous oxide. See Parker O-Ring Handbook at page 199 [120].

CSB • Investigation Report • Airgas • Cantonment, Florida 79

Figure 48. O-ring in Trailer 182. This photo shows the O-ring (inner black circle) for the Trailer 182 relief valve that may be incompatible with nitrous oxide. The area near the O-ring shows evidence of heat exposure.

  1. Although an incompatible material could burn in nitrous oxide and create enough heat to start an

explosion, the CSB did not identify any evidence showing this incident initiated by the opening of a relief device due to high pressure in Trailer 182. The available data, however, is limited to two points in the 18-hour period before the explosion.

  1. Airgas operators record trailer pressure every 12 hours. Airgas operators recorded Trailer 182

pressure as 280 psig at 6:00 am (CDT) on the morning of August 28, 2016. This pressure was 30 psi lower than the value of 310 psig recorded at 6:00 pm (CDT) on August 27, 2016.

  1. To preserve any physical evidence within the Trailer 182 pressure relief valve that was in service at

the time of the incident, this valve was not lift-tested to evaluate set pressure. Trailer 182 was equipped with a spare relief valve as shown in Figure 49. The spare relief valve was tested and lifted at 350 psig. With the two Trailer 182 pressure data points of 280 and 310 psig being less than 90 percent of the likely relief valve set pressure of 350 psig, it is unlikely that lifting the relief valve due to high trailer pressure initiated the incident.

CSB • Investigation Report • Airgas • Cantonment, Florida 80

Figure 49. Trailer 182 relief valves. This pre-incident photo taken at a maintenance facility shows the location of the two relief valves (yellow ovals) that protect Trailer 182 from high pressure. Only one valve is in service at a time. A 3-way valve, obscured by the blue piping, can change which valve is in service.

  1. CGA G-8.3–2016, Safe Practices for Storage and Handling of Nitrous Oxide, describes the

potential role that contamination can have on decomposition reactions. The standard notes, “Oil and grease are unacceptable contaminants in a nitrous oxide installation and can create a severe fire hazard.”195 CGA also warns about the danger of combustible materials in nitrous oxide. The standard states: Any combustible material, such as hydrocarbon lubricants or flammable mixtures will promote violent decomposition and lower the propagation threshold. A flammable mixture will lower the propagation threshold even if present below the lower explosion limit. All equipment that will be in contact with nitrous oxide shall be cleaned for oxygen service and lubricants shall be oxygen compatible.196

  1. CGA does not specify any “restriction regarding the use of common commercial metallic materials

for nitrous oxide installations” but states “carbon steel, manganese steel, chrome molybdenum steel, stainless steel, brass, copper, copper alloys, and aluminum are considered to be suitable for use with nitrous oxide.”197

  1. CGA requires more stringent metallurgy requirements for strainers; however, the standard states:

“Filters or strainers shall be designed considering the oxidizing properties of nitrous oxide. Mesh

195 See [150], Section 4.3.1.3. 196 Id., at Section 4.3.3.4. 197 Id., at Section 5.2.1.

CSB • Investigation Report • Airgas • Cantonment, Florida 81 filters or strainers made from high nickel alloys (such as Monel, Inconel, nickel 200 alloys) or high copper alloys (such as brass) are preferred due to increased resistance to oxidizer fires.”198, 199

  1. Although the CGA standard provides guidance on metallurgy for equipment, it does not specifically

address the potential for metal corrosion products to act as a catalyst in promoting nitrous oxide decomposition as noted in the safety guidance Scaled Composites developed following the 2007 explosion in Mojave, California.

  1. Post-incident, Airgas started development of a contamination-testing program focused on safety,

not only quality control. Company testing with respect to this issue remains ongoing, and the CSB encourages Airgas to complete this testing and to share its results with the CSB and with the nitrous oxide industry through the Compressed Gas Association.

  1. Electrical Safety
  2. Although the CSB did not identify a static charge accumulation scenario based on all available

physical evidence, the agency could not eliminate static discharge as a possible cause of the August 28, 2016 explosion.

  1. CGA identifies static discharge as a source known to initiate nitrous oxide vapor decomposition

reactions.200 In addition, CGA states: “Nitrous oxide installations shall be grounded in accordance with local regulatory requirements, for example NFPA 70 [or the] National Electric Code.”201

  1. CGA refers to trailers as transport tanks. To address static electricity concerns with trailers, CGA

states: “All parts of the transport tank shall be bonded to ensure electrical continuity.”202

  1. Although Air Liquide corporate guidance issued following the 2012 Moncada explosion required

all parts of trailer trucks and storage tanks to be electrically bonded, Airgas did not have a program to ensure effective electrical bonding or grounding when loading or moving nitrous oxide to trailer trucks or shipping containers. Due to the absence of an effective bonding or grounding program when loading nitrous oxide, the CSB could not eliminate the possibility that static electricity caused the Cantonment explosion.

  1. To ensure a spark from static electricity does not trigger a nitrous oxide decomposition explosion,

Airgas should develop and implement a comprehensive electrical bonding and grounding program. F. Post-Incident Valve Positions

  1. Nearly all of the block valves used for nitrous oxide loading operations are quarter-turn ball valves.

(Figure 50) The “ball” in such valves refers to the internal component of the valve, which is a ball with a hole through the middle that rotates 90 degrees to either allow flow or prevent flow. The

198 Id., at Section 5.4. 199 See high performance alloys including Monel, Inconel, and Nickel 200 [90]. 200 See [150], Section 4.3.3. 201 Id., at Section 5.7. 202 Id., at Section 7.3.4.

CSB • Investigation Report • Airgas • Cantonment, Florida 82

valve handle position indicates the position of the ball – open when parallel and closed when perpendicular to the valve body. The “quarter-turn” refers to how the valve is operated – requiring a 90-degree turn of the handle to move the ball from closed to open and vice-versa, making quarter- turn ball valves relatively easy to operate. Because they are easy to operate, however, the position of many quarter-turn ball valves at Airgas likely changed from the force of the explosion.

Figure 50. Images of quarter-turn ball valves similar to those installed at the Airgas Cantonment facility.203, 204

  1. During field evaluation, the CSB found the ACD centrifugal pump inlet piping open to nitrous

oxide storage tank two at the time of the incident. On the outlet (discharge) side of the ACD centrifugal pump, the first valve is open, but a downstream valve is almost fully closed. (Figure 51) The CSB concluded that this quarter-turn ball valve was most likely open at the time of the incident, and that the force of the explosion changed the position of the valve.205

Figure 51. Post-incident photo of the nitrous oxide transfer pumps. The yellow circle identifies the nearly closed discharge valve – a quarter-turn ball valve.

203 See Fortune valve [47]. 204 See Apollo valve [48]. 205 The post-incident position of at least a dozen valves appears to have been altered by the force of the explosion. As a result, these valve positions are not reliable evidence for evaluating pre-incident piping alignment.

CSB • Investigation Report • Airgas • Cantonment, Florida 83

  1. As shown in Figure 52, an electrical power cable likely ejected from Trailer 182 (Figure 53) and

entangled into the pump piping. This electrical cable may have pulled or pushed the valve handle towards the closed position during the explosion.

Figure 52. Post-incident photo of nitrous oxide transfer pumps. The orange oval shows the discharge valve that may have nearly closed during the explosion by the Trailer 182 power cable. The open position of this valve handle is towards the left and parallel to the piping. This is the same valve circled in yellow in Figure 51

Figure 53. Pre-incident photo of the black electrical cable located inside the equipment box located at the bottom and towards the rear of Trailer 182. This photo also shows an example of the flexible hose connections recommended by pump manufacturers and used by Airgas on trailer pumps.

  1. If the quarter-turn ball valve was in the closed position just before the incident and slightly opened

by explosion, the ACD nitrous oxide pump could still be the source of heat that triggered the explosive decomposition reaction. It is conceivable that as the operator was starting the pump he had difficulty establishing flow and shut the pump off after the decomposition reaction already initiated. The operator then could have closed the ball valve as part of the normal practice to fill the pump with liquid for re-cooling. During this short period, Trailer 182 could have exploded.

CSB • Investigation Report • Airgas • Cantonment, Florida 84

G. Inherently Safer Design and the Hierarchy of Controls

  1. Although industry safety standards recognize the pump as the “primary hazard” during nitrous

oxide transfer operations, transferring liquid nitrous oxide from a storage tank to a trailer truck does not require a pump. Inherently safer design could eliminate the transfer pump, such as operating the trailer truck at a lower pressure or increasing the elevation of the storage tank.

  1. The Center for Chemical Process Safety (CCPS)
  2. In 1985, the American Institute of Chemical Engineers (AIChE) established the Center for

Chemical Process Safety (CCPS). The stated purpose of CCPS is “to establish a not-for-profit scientific and educational organization to provide expert leadership and focus to engineering practices and research that can prevent or mitigate catastrophic events involving hazardous materials.”206

  1. Air Liquide is a corporate member of CCPS.207 CCPS states: “Any corporation, company,

foundation, or partnership, located anywhere, having an interest in process safety may become a Member of CCPS through payment of annual dues to AIChE and through designation of a Technical Representative and a Financial Representative to CCPS.”208

  1. The CCPS book Inherently Safer Chemical Processes – A Life Cycle Approach,209 defines

inherently safer design as the process of identifying and implementing inherent safety in a specific context that is permanent and inseparable.

  1. In the book Guidelines for Engineering Design for Process Safety,210 CCPS states, “inherently safer

design solutions eliminate or mitigate the hazard by using materials and process conditions that are less hazardous.”211

  1. Inherently safer technologies are relative; inherently safer technology requires comparing one

technology with another with regard to a specific hazard or risk.212 A technology may be inherently safer with respect to one risk but not safer from another risk. For this reason, it is important to carry out a comprehensive, documented hazard analysis to determine the individual and overall risks in a process in order to minimize the total risks of hazards presented.

  1. An inherently safer systems review details a list of choices offering various degrees of inherently

safer implementation. The review should include risks of personal injury, environmental harm, and lost production, as well as evaluating economic feasibility.

206 See purpose of CCPS [138]. 207 See CCPS corporate members [50]. 208 See CCPS membership qualification [138]. 209 See Inherently Safer Chemical Processes – A Life Cycle Approach [106]. 210 See Guidelines for Engineering Design for Process Safety [102]. 211 Id., at Section 5.1.1. 212 See [106], Section 2.2.

CSB • Investigation Report • Airgas • Cantonment, Florida 85

  1. The CSB often refers to the hierarchy of controls as the appropriate approach for hazard mitigation

and in making safety recommendations.213 As shown in Figure 54, the hierarchy of controls is a method to provide effective risk reduction by applying, in order of robustness, inherently safer design, passive safeguards, active safeguards, and procedural safeguards.214 This strategy promotes a tiered or hierarchical approach to risk management.

Figure 54. Hierarchy of Controls. The higher in the hierarchy (further to the left), the more effective the risk reduction achieved.

  1. As shown in Figure 55, the hierarchy of controls is applicable to the effectiveness ranking of

inherent safety principles used to control hazards. Again, the further up (to the left) the hierarchy, the more effective the risk reduction achieved. All concepts in the hierarchy of controls should be included in the process of risk assessment and reduction.

213 The CSB describes the concept of the “Hierarchy of Controls” in several previous investigation reports. See recent CSB final investigation reports for Williams - Geismar, Louisiana [236], Tesoro - Martinez, California [235], Tesoro - Anacortes, Washington [231], Chevron - Richmond, California [229], and Key Lessons for Preventing Incidents from Flammable Chemicals in Educational Demonstrations [233]. 214 See CCPS Book, Inherently Safer Chemical Processes – A Life Cycle Approach [106], Section 2.1.

CSB • Investigation Report • Airgas • Cantonment, Florida 86

Figure 55. Inherent Safety Principles. The boxes reflect the hierarchy of safer controls from eliminating hazards near the top left through personal protective equipment at the bottom right.215

  1. In its Guidelines for Investigating Chemical Process Safety Incidents, CCPS discusses the

importance of evaluating inherently safer design when developing recommendations. CCPS states: Recommendations that lead to inherently safer designs are preferred to those limited to adding-on extra mitigation or prevention features. Inherently safer designs limit reliance on human performance, equipment reliability, or properly functioning preventive maintenance programs for successful prevention of an incident. Inherently safer design changes yield greater economic benefits if they are implemented during the early design phases. Nevertheless, the incident investigation team should consider them when developing recommendations.216

  1. There may be opportunities to prevent future nitrous oxide decomposition explosions by applying

inherently safer design and the hierarchy of controls. For example, increasing the elevation between the nitrous oxide storage tank and the truck loading station could eliminate the need for nitrous oxide transfer pumps. Alternatively, the trailer truck can vent to a lower pressure system to

215 See Process Plants: A Handbook for Inherently Safer Design [51]. 216 See Guidelines for Investigating Chemical Process Incidents [104], page 255.

CSB • Investigation Report • Airgas • Cantonment, Florida 87 provide the pressure difference needed between the storage tank and the trailer truck to eliminate the pump. These types of options require careful consideration and engineering, and would represent a significant change in nitrous oxide transfer operations, but such efforts could be worthwhile. Meanwhile, some efforts may not be that difficult to implement. For example, Airgas records indicate that international shipping containers already vent to a lower pressure system during loading because the shipping containers have different design conditions (temperature or pressure) than the storage tanks.217

  1. Materials of Construction
  2. Airgas filter and strainer metallurgy falls short of CGA requirements to use high nickel or high

copper alloys.218 Because degradation of equipment, including strainers, strainer baskets, and steel wool may have contributed to the incident, upgrading equipment material of construction could reduce the risk of future nitrous oxide explosions.

  1. Airgas should evaluate and upgrade equipment metallurgy to minimize the presence of future

contaminants and catalysts and reduce the risk of starting a nitrous oxide decomposition reaction.

  1. Explosion Prevention Systems
  2. The National Fire Protection Association (NFPA) publishes NFPA 69, Standard on Explosion

Prevention Systems, to “provide effective deflagration prevention and control for enclosures where there is the potential for a deflagration.”219

  1. NFPA 69 defines deflagration pressure containment as:

The technique of specifying the design pressure of a vessel and its appurtenances so they are capable of withstanding the maximum pressures resulting from an internal deflagration.

  1. By increasing the design pressure of the equipment involved in transferring and shipping nitrous

oxide, in may be possible to contain a decomposition reaction.

  1. Airgas should evaluate passive explosion prevention systems such as the protective methods

established in NFPA 69, Standard on Explosion Prevention Systems.

  1. Deflagration Venting
  2. Although previous nitrous oxide explosions have killed and injured workers, Airgas did not

evaluate safeguards such as a deflagration vent system to protect equipment like storage tanks and trailer trucks from catastrophic rupture.

217 Rather than venting back to the storage tank, shipping containers are vented to the inlet of a process compressor or to the atmosphere. 218 High nickel and high copper materials are more resistant to corrosion and CGA states they are, “preferred due to increased resistance to oxidizer fires.” [150], Section 5.4. 219 See free access to the 2014 edition of NFPA 69 at section 4.1 [52].

CSB • Investigation Report • Airgas • Cantonment, Florida 88

uncontrolled explosion. The basic idea is that a vessel design can include a section that will preferentially fail to release the force of an explosion in lieu of an uncontrolled explosion. Alternatively, the vessel can be equipped with a safety device such as a panel that will burst open to relieve the pressure. Figure 56. Explosion venting (deflagration venting) illustration.220

  1. Safety guidance published by Scaled Composites in 2009 recognized the “very high” energy

released from a nitrous oxide decomposition explosion in large vessels, such as a trailer truck.221 The company’s safety guidance recommended designing equipment to control and safely reduce this energy in a manner that avoided “catastrophic failure,” such as deflagration venting.222

  1. The National Fire Protection Association (NFPA) publishes NFPA 68, Standard on Explosion

Protection by Deflagration Venting, to “provide effective deflagration venting for enclosures where there is the potential for a deflagration.”223

220 See Explosion Hazards in the Process Industries [108], page 141. 221 See Scaled Composites Nitrous Oxide Safety Guidelines [15]. 222 Id. 223 See free access to the 2013 edition of NFPA 68 [53]).

CSB • Investigation Report • Airgas • Cantonment, Florida 89

  1. NFPA 68 requires that “deflagration venting shall be arranged to avoid injury to personnel by the

vent discharge.”224

  1. Airgas should evaluate safeguards such as the protective methods established in NFPA 68,

Standard on Explosion Protection by Deflagration Venting.

  1. Protective Physical Barrier
  2. Although the goal should be to prevent future nitrous oxide explosions, the history of nitrous oxide

explosions indicates the nitrous oxide manufacturing industry has not attained this level of safety performance.

  1. Blast walls are used in the offshore industry to ensure “escape and evacuation of personnel off the

platform.”225 Although the use of blast walls has been critiqued as a less robust safety approach than inherently safer design options,226 it remains a viable secondary option that can protect workers from injury or death caused by explosions.

  1. Similar to nitrous oxide, liquid oxygen pumps have been involved in significant process safety

incidents such as “fire, explosion, dispersion of molten metal or metal fragments.”227 Unlike nitrous oxide, however, industry safety standards for liquid oxygen pumps advise using “barriers or shields to protect personnel and equipment in the event of an incident,” such as an explosion.228

  1. To protect workers, industry safety standards provide design requirements for barriers including:

A barrier may be reinforced concrete or equivalent, low-carbon steel plate, or other suitable material. It shall be structurally designed to withstand the impact of projected parts or debris, jet of liquid, and possible flame impingement. The barrier should be dimensioned to protect personnel involved in the pump operation, in maintenance on adjacent equipment, or individuals working in or passing through what would be the pump hazard area.229

  1. As part of its post-incident corrective actions and process hazard analysis, Airgas should evaluate

potential use of physical barriers to protect workers from nitrous oxide explosions during transfer and loading operations.230

224 Id., at Section 4.2.1.3. 225 See Why Do We Still Have Blast Walls on Offshore Platforms? [54]. 226 Id. 227 See AIGA 55/14: Installation Guide For Stationary Electric-Motor Driven Centrifugal Liquid Oxygen Pumps [215], Section 3.5. 228 Id., at Section 6.1.1.2. 229 Id., at Section 6.3.3. 230 See Explosion and Blast Safety Systems [56].

CSB • Investigation Report • Airgas • Cantonment, Florida 90

V. Nitrous Oxide Industry Regulatory Analysis A. CSB Reactive Hazards Study 1. In September 2002, the CSB unanimously approved Improving Reactive Hazard Management, a report covering a “two-year special CSB investigation into hazards at U.S. sites that manufacture, store, or use potentially reactive chemicals.”231 2. The CSB’s reactive hazards study noted that, “Uncontrolled reactions have led to serious explosions, fires, and toxic emissions. The impacts may be severe in terms of death and injury to people, damage to physical property, and effects on the environment.”232 3. Former CSB Chair Carolyn Merritt said, “There have been many positive changes in chemical industry process safety since 1984, when the Bhopal nightmare occurred. But the CSB has found that accidents involving reactive chemicals still occur all too frequently and often with tragic results.”233, 234, 235 4. In March 2003, former CSB Board Member Dr. Gerald Poje testified: Reactive hazards are the dangers associated with uncontrolled chemical reactions in industrial processes. These uncontrolled reactions - such as thermal runaways and chemical decompositions - have been responsible for numerous fires, explosions, and toxic gas releases. From 1980 … [to] 2001, 167 serious reactive accidents caused 108 fatalities in the U.S., according to the CSB's reactive hazards investigation.236 5. The CSB found that similar to nitrous oxide, “More than half of the accidents involved chemicals that are exempt from OSHA and EPA process safety rules.”237 6. In September 2002, the Board recommended that OSHA amend its Process Safety Management (PSM) standard to protect workers more fully from reactive chemical hazards. The CSB directed a similar recommendation to the EPA, whose Risk Management Program (RMP) rule is designed to protect the public and the environment from chemical accidents.

231 See CSB news release [57]. 232 See CSB Hazard Study - Improving Reactive Hazard Management at page 1 [230]. 233 See CSB Safety Video: Reactive Hazards at 1:18 [228]. 234 “The 1984 toxic release in Bhopal, India, which caused several thousand known fatalities, resulted not only in the creation of the CSB but also in the first Federal regulations specifically designed to prevent major chemical accidents that threaten workers, the public, and the environment. One of these regulations is the OSHA PSM standard, which was adopted in 1992.” See CSB Investigation Report: Tesoro Anacortes Refinery at page 85 [231]. 235 Id., at 0:12. Bhopal was a chemical reactives incident. The toxic release at Bhopal was the result of an exothermic chemical reaction between methyl isocyanate and water. 236 See CSB news release [137]. 237 Id. Although OSHA or EPA rules may not have covered the specific chemical involved in these accidents, other chemicals in the process may have resulted in the process being covered by these Federal regulations.

CSB • Investigation Report • Airgas • Cantonment, Florida 91 7. The study also noted that: In 1992, OSHA promulgated its Process Safety Management (PSM) Standard (29 CFR 1910.119). The standard covers processes containing individually listed chemicals that present a range of hazards, including reactivity, as well as a class of flammable chemicals. Reactive chemicals were selected from an existing list of chemicals identified and rated by the National Fire Protection Association (NFPA) because of their instability rating of “3” or “4” (on a scale of 0 to 4).238 8. OSHA used NFPA 49–1975, Hazardous Chemicals Data to identify reactive chemicals.239 NFPA 49–1975, Hazardous Chemicals Data does not list nitrous oxide as a hazardous or reactive chemical.240 9. The NFPA diamond identifies the reactivity of nitrous oxide as zero (0). (Figure 57)

Figure 57. NFPA Diamond for nitrous oxide.241 9. The CSB study concluded that, “Reactive incidents are a significant chemical safety problem,”242 and that, “The OSHA PSM Standard has significant gaps in coverage of reactive hazards because it is based on a limited list of individual chemicals with inherently reactive properties.”243 10. The CSB also concluded that, “NFPA instability ratings are insufficient as the sole basis for determining coverage of reactive hazards in the OSHA PSM Standard.”244 11. As a result of the study, CSB recommended that OSHA, “Amend the Process Safety Management (PSM) Standard, 29 CFR 1910.119, to achieve more comprehensive control of reactive hazards that could have catastrophic consequences.”245 The CSB recommendation included language to

238 An NFPA instability rating of “4” means that materials in themselves are readily capable of detonation or explosive decomposition or explosive reaction at normal temperatures and pressures. A rating of “3” means that materials in themselves are capable of detonation or explosive decomposition or explosive reaction, but require a strong initiating source or must be heated under confinement before initiation. See CSB Hazard Study - Improving Reactive Hazard Management at page 2 [230]. 239 Id., at page 49. 240 See [59]. 241 See Airgas nitrous oxide Safety Data Sheet (SDS) at page 11 [58]. 242 See CSB Hazard Study - Improving Reactive Hazard Management at page 23 [230]. 243 Id., at page 23. 244 Id., at page 23. 245 Id., at page 25.

CSB • Investigation Report • Airgas • Cantonment, Florida 92

“broaden coverage of hazards from self-reactive chemicals” to include chemicals such as nitrous oxide.246 The status of this recommendation is Open – Unacceptable Response / No Response Received.247, 248 12. The CSB also recommended that OSHA, “Implement a program to define and record information on reactive incidents that OSHA investigates or requires to be investigated under OSHA regulations.”249 The status of this recommendation is Open – Unacceptable Response / No Response Received.250 13. The CSB hereby reiterates CSB Recommendation 2001-01-H-1 and CSB Recommendation 2001- 01-H-2.251 The CSB urges OSHA to reconsider its decision not to implement these recommendations. B. EPA and OSHA 14. The CSB found that the major safety hazards associated with nitrous oxide manufacturing are not regulated by EPA RMP or OSHA PSM,252 although there have been process safety incidents, “such as violent decomposition of nitrous oxide and the rupture of nitrous oxide tanks [that] have occurred at production, storage, and distribution facilities.”253 15. The EPA RMP rule does not include nitrous oxide in its list of regulated substances.254 In addition, the OSHA PSM standard does not cover nitrous oxide because the chemical is not included in OSHA’s list of highly hazardous chemicals.255 16. In 1974, OSHA incorporated by reference the Compressed Gas Association (CGA) Pamphlet G- 8.1-1964, Standard for the Installation of Nitrous Oxide Systems at Customer Sites.256 Under 29 C.F.R. § 1910.105, OSHA regulates the piped systems for the in-plant transfer and distribution of nitrous oxide. OSHA requires companies to design, install, maintain, and operate these systems to

246 See CSB Hazard Study - Improving Reactive Hazard Management at page 23 [230]. 247 See CSB Recommendation 2001-01-H-1 Status [234] 248 See CSB Status Designation Explanation [136]. Open - Unacceptable Response/No Response Received (O - UR) means that a response to the recommendation has not been received within 270 days of issuance or the recipient responds by expressing disagreement with the need outlined in the recommendation. The Board believes, however, that further dialogue or advocacy may persuade the recipient to act. 249 See CSB Hazard Study - Improving Reactive Hazard Management at page 26 [230]. 250 See CSB Recommendation 2001-01-H-2 Status [234]. 251 See CSB Recommendation 2001-01-H-1 and 2001-01-H-2 Status [234]. 252 Airgas stated that their nitrous oxide process is not covered by RMP or PSM. OSHA communicated to the CSB investigation team that they conducted a review of the PSM regulation and agree that the air gas nitrous oxide process is not covered by the PSM regulation. 253 See [150], Section 1. 254 See EPA List of Regulated Substances under the RMP [129]. 255 See OSHA List of Highly Hazardous Chemicals [125]. 256 29 C.F.R. § 1910.105. See OSHA 1910.105 [124].

CSB • Investigation Report • Airgas • Cantonment, Florida 93 the 1964 version of CGA G-8.1.257 This standard, however, “does not apply to nitrous oxide manufacturing plants.”258 17. OSHA did not adopt CGA G-8.3 because the standard did not exist when Congress authorized the Secretary of Labor to adopt national consensus standards without going through the normal rulemaking process.259 18. Although OSHA maintains records for previous U.S. nitrous oxide incidents,260 records for the 1980 Richmond incident are not available in its database.261 That State of California also, maintains investigation records, but Cal/OSHA informed the CSB that it only maintains records for seven years, and thus the records for the two nitrous oxide explosions in California are no longer available.262 C. FDA 19. As nitrous oxide has use as a drug, the U.S. Food & Drug Administration (FDA) regulates its manufacture. Nitrous oxide medical applications include use as a sedative or a method of controlling pain, primarily in dental procedures. FDA regulations, however, focus on product quality, and touch upon safety of patients who are administered nitrous oxide. As a result, Airgas management systems focused on product quality, as well as patient safety, but Airgas focused little attention on process safety. 20. Airgas Process Validation policy explains, “Nitrous Oxide is commonly used as an anesthetic gas for medical procedures. As such, its production and use is regulated by the U.S. FDA.”263 21. The company policy further clarifies its adherence to FDA guidance that, “Process validation is a requirement of the Current Good Manufacturing Practices Regulations for Finished Pharmaceuticals, 21 CFR Parts 210 and 211, and of the Good Manufacturing Practice [GMP] Regulations for Medical Devices, 21 CFR Part 820, and therefore, is applicable to the manufacture of pharmaceuticals and medical devices.”264 22. As part of process validation, companies need to evaluate worst-case conditions. According to guidance published by FDA, the worst-case conditions are, “A set of conditions encompassing upper and lower processing limits and circumstances, including those within standard operating

257 Id. 258 See [146], Section 2. 259 See Updating OSHA Standards Based on National Consensus Standards [135]. 260 See OSHA Nitrous Oxide Incidents [126] and Scaled Composites citations [221]. 261 OSHA fatality and catastrophe investigation summaries are not available for incidents that occurred before 1984. See Fatality and Catastrophe Investigation Summaries [222]. 262 Although Cal/OSHA was not able to provide the CSB with investigation records because the agency only retains them for seven years, the website knightsarrow.com provides a link to its copy of the Cal/OSHA Scaled Composites investigation file: Cal/OSHA Investigation File - Scaled Composites Explosion, [117]. The CSB did not identify public records for the 1980 Richmond, California incident, but obtained a copy of the Puritan-Bennett investigation report from Airgas. 263 21 C.F.R. Parts 210 and 211. 264 Airgas used the 1987 FDA guidance Guideline on General Principles of Process Validation (1987) at Section III [127]. The FDA issued a 2011 update to this guidance. See Guideline on General Principles of Process Validation (2011) [223].

CSB • Investigation Report • Airgas • Cantonment, Florida 94

procedures, which pose the greatest chance of process or product failure when compared to ideal conditions. Such conditions do not necessarily induce product or process failure.”265 23. The Process Validation policy also describes the process Airgas used to establish worst-case conditions. The policy states: The Worst Case Conditions were identified and assessed through Failure Mode and Effects Analysis (FMEA). We chose the FMEA format provided by the Compressed Gas Association (CGA) in publication P-B.2 2003; Guideline for Validation of Air Separation Unit and Cargo Tank Filling for Oxygen USP and Nitrogen NF; Third Edition.266 24. Airgas performs a failure mode and effects analysis (FMEA) as part of its process validation program, but this analysis did not identify or assess the potential for nitrous oxide decomposition reactions, nor did it evaluate the effectiveness of safeguards to prevent nitrous oxide decomposition hazards, such as the loading pump run-dry safety interlock. 25. Although companies could use a FMEA analysis to identify, evaluate, and control process safety hazards, the FMEA conducted by Airgas focused on product quality and consumer safety. In describing how the company conducted the FMEA, an Airgas manager explained to CSB investigators that the FMEA analysis was “conducted with an eye towards medical quality as opposed to safety.” VI. Air Liquide and Airgas Organizational Analysis 1. Because Airgas management systems did not adequately focus on process safety, each of the following contributed to the Cantonment explosion:  Airgas never performed a hazard analysis to identify and control process safety hazards;  Airgas made changes to the nitrous oxide transfer process by selecting a new pump that made an explosion more likely;  Safeguards implemented by Airgas intended to prevent an explosion, including flame arrestors and safety interlocks were not effective; and  Airgas management did not observe established industry safety standards and good practices, nor did Airgas embrace its own lessons learned from past incidents – whether at its own sites or at sites that eventually came under the same corporate umbrella following a history of mergers and acquisitions that

265 Id., at Definitions. 266 The U.S. Pharmacopeial Convention (USP) “sets standards for the identity, strength, quality, and purity of medicines, food ingredients, and dietary supplements manufactured, distributed and consumed worldwide.” See USP [60]. “The FDA defines process validation as follows: Process validation is establishing documented evidence which provides a high degree of assurance that a specific process will consistently produce a product meeting its pre-determined specifications and quality characteristics.” See Guideline on General Principles of Process Validation (1987) at Section IV [127].

CSB • Investigation Report • Airgas • Cantonment, Florida 95 most recently concluded with the Air Liquide acquisition of Airgas in 2016. A more effective program aimed at capturing and acting on relevant lessons learned could have provided protection from an explosive nitrous oxide decomposition reaction. A. Air Liquide (Airgas) Knowledge of Nitrous Oxide Decomposition Hazards 2. At the time of the August 28, 2016 incident, as the owner of all nitrous oxide manufacturing operations in the United States and Canada, Air Liquide had technical knowledge of the explosive hazards with nitrous oxide decomposition. 3. An Air Liquide technical expert developed and presented best practices to prevent nitrous oxide pump incidents at a CGA conference in 2013. This presentation reviewed the decomposition chemistry, identified the past incidents and their causes, described best approaches to run-dry pump interlock strategies, and suggested further industry changes demonstrating a high degree of knowledge with respect to nitrous oxide and related technologies.267 4. The company investigated the 2012 explosion in Moncada, Spain, stemming from its operations in that country, and appears to have developed important findings and corrective actions. 5. Air Liquide operated the Richmond, California facility since 2001 and company personnel were knowledgeable about the 1980 incident and lessons learned. 6. Air Liquide was also knowledgeable about the 2001 explosion in Eindhoven, the Netherlands. An Air Liquide nitrous oxide technical expert included the Eindhoven incident in his presentation at a CGA conference in 2013. 7. In addition, Airgas technical staff helped write the CGA G-8.3 industry safety standard, Safe Practices for Storage and Handling of Nitrous Oxide. 8. Although Air Liquide knew how to prevent a nitrous oxide explosion, there were gaps in safety knowledge and an overall lack of focus on safety management systems to control these process safety hazards remained at Cantonment, even after Air Liquide acquired Airgas. B. Gaps in Air Liquide (Airgas) Nitrous Oxide Safety Knowledge 9. Airgas maintained files on previous incidents and nitrous oxide decomposition studies. While these files contained information on most of the previous nitrous oxide explosion incidents, the Airgas files lacked important safety information on the 2007 Scaled Composites explosion. 10. The Airgas files showed that company personnel tried to learn about the details of the Scaled Composites incident in July 2008. Although Airgas supplied nitrous oxide to the Scaled

267 See [161].

CSB • Investigation Report • Airgas • Cantonment, Florida 96

Composites space program,268 neither the government nor Scaled Composites provided copies of their investigation reports to Airgas. 11. Notably missing from the Airgas files on previous incidents, however, are the nitrous oxide safety guidelines that Scaled Composites publicly issued in July 2009.269 12. Furthermore, no records provided by Airgas to the CSB indicate the company ever considered or developed a program to follow important recommendations in the Scaled Composites safety guidelines, such as:  Test for ignition sources, including friction, static discharge, or impact;  Ensure no component could exceed a temperature of 571 °F;  Evaluate compatibility of elastomers, plastics, metals, and lubricants;  Remove all incompatible materials from a nitrous oxide flow path;  Eliminate all corrosion prone metals from nitrous oxide flow path or storage; and  Design pressure vessels, such as storage tanks or trailers, to provide a controlled vent during an overpressure event, to prevent a catastrophic vessel failure.270 13. In 2003, CCPS published, Essential Practices for Managing Chemical Reactivity Hazards, an industry consensus guidance document specifically aimed at protecting workers and the public from uncontrolled chemical reactions, such as the decomposition of nitrous oxide.271 CCPS states that managing chemical reactivity hazards is not a “one-time” activity.272 Rather, effective management of reactivity hazards requires a continual management commitment to protect against the potential consequence of chemical reactivity incidents.273 Such a commitment includes an on-going effort to learn and incorporate key lessons from other major accidents. In addition, CCPS provided specific guidance to address reactivity hazards within a company’s safety management system.274 C. Process Safety Management 14. Reactive hazards, such as nitrous oxide decomposition, require an effective safety management system to prevent major accidents. Because neither the EPA nor OSHA regulate nitrous oxide manufacturing, process safety management systems are not legally required for nitrous oxide manufacturing. If the chemical were subject to heightened regulatory standards, then

268 See Airgas Helps Fuel SpaceShipOne [142]. 269 See Scaled Composites Nitrous Oxide Safety Guidelines [15]. 270 Id. 271 See Essential Practices for Managing Chemical Reactivity Hazards at page viii [100]. 272 Id., at page 17. 273 Id., at page 17. 274 Id., at page 65.

CSB • Investigation Report • Airgas • Cantonment, Florida 97 manufacturers would be responsible for implementing a number of process safety tools that would improve the process safety performance of the industry. 15. As a result of its investigation, and in the absence of enhanced regulatory coverage, the CSB is recommending that the U.S. nitrous oxide manufacturing companies, Airgas and Matheson,275 work together with the CGA to develop and implement a safety management system to manage process safety hazards, including nitrous oxide decomposition hazards of nitrous oxide manufacturing in the United States. Some of these tools are discussed below. 16. In OSHA 3132, Process Safety Management, OSHA defined “The Problem” of major accidents in the U.S. chemical manufacturing industry, which that agency attempted to address through its Process Safety Management (PSM) regulation. OSHA stated: Unexpected releases of toxic, reactive, or flammable liquids and gases in processes involving highly hazardous chemicals have been reported for many years. Incidents continue to occur in various industries that use highly hazardous chemicals which may be toxic, reactive, flammable, or explosive, or may exhibit a combination of these properties. Regardless of the industry that uses these highly hazardous chemicals, there is a potential for an accidental release any time they are not properly controlled. This, in turn, creates the possibility of disaster.276 17. In addition, OSHA publication 3133, Process Safety Management Guidelines for Compliance, described process safety management as “the proactive identification, evaluation and mitigation or prevention of chemical releases that could occur as a result of failures in process, procedures or equipment.”277 18. More recently, in its 2016 publication Guidelines for Implementing Process Safety Management, CCPS described the current state of PSM and the global adoption of management systems to control process safety hazards. CCPS stated: Companies have been implementing process safety management (PSM) systems for over 25 years. A variety of PSM structures have been used - some based upon regulatory requirements and many more based upon evolving industry good practices. These PSM systems are designed to manage the hazards and risks associated with processes using hazardous chemicals or energy. Management of these aspects requires a PSM system to focus on nurturing the performance of equipment and people throughout the life cycle of their deployment in a facility. The adoption of PSM

275 Matheson is the current owner of the nitrous oxide manufacturing facilities in Richmond, California and Donora, Pennsylvania. 276 See OSHA Publication 3132, Process Safety Management (2000) [132]. 277 See OSHA Publication 3133, Process Safety Management Guidelines for Compliance (1994) [131].

CSB • Investigation Report • Airgas • Cantonment, Florida 98

systems has gone global, offering many new opportunities to improve upon implementation practices of the past.278 19. Despite the global adoption of process safety management systems recognized by industry safety leaders, however, the CSB investigation of the August 28, 2016 Airgas incident revealed that, although not required, the company’s lack of a process safety management system to identify, evaluate, and control hazards led to the explosion. The contributing causes of the explosion that killed the Airgas employee all stemmed from the company’s lack of an effective overall process safety management system.

  1. Airgas Process Safety Policy

Airgas developed a “Process Safety” policy for the Cantonment facility. The policy does address some key aspects of process safety including requirements for inspection of safety devices. The policy states, “All process safety items such as relief valves, pressure and temperature switches, etc. must be periodically inspected and tested to ensure their proper functioning.” The policy also addresses potential changes to safety devices, stating, “No change shall be made to the plant which in any way will eliminate, circumvent or compromise a process safety device.” 21. Although Airgas does not use management of change terminology in the Process Safety policy, the policy does address changes to alarm and shutdown set points. The policy states, “… alarm and shutdown set points shall not be changed prior to consulting the plant manager.” The policy also prohibits equipment changes without approval, stating, “Maintenance and repair must be limited to the replacement with like components unless cleared through the plant manager.” 22. The remainder of the Airgas process safety policy focuses on major process hazards and contains significant coverage of nitrous oxide decomposition. The policy states, “Pure nitrous oxide is a stable compound when at the temperatures and pressures normally encountered in the field. However, given the right combination of temperature and pressure, nitrous oxide can be made to decompose; possibly explosively.” 23. As shown in Figure 58, the Airgas process safety policy explains nitrous oxide explosion limits. According to Airgas, at the pressure used to transfer liquid nitrous oxide from the storage tanks to a trailer, boiling water (212 °F) is hot enough to start an explosion.

278 See Guidelines for Implementing Process Safety Management [103], Introduction.

CSB • Investigation Report • Airgas • Cantonment, Florida 99

Figure 58. Airgas nitrous oxide explosion limits. This chart is from the Airgas process safety policy and shows the pressure and temperature conditions necessary for an explosive nitrous oxide decomposition reaction. According to this chart, at the normal pressure of the nitrous oxide transfer pumps, boiling water is hot enough to start an explosion. Recall that the ACD pump pressure ranges from 265 to 330 psia (blue lines). The average pressure is roughly 300 psia and corresponds to a decomposition temperature of 212 °F (red lines). 24. The policy states: “Two events must take place for a nitrous oxide decomposition to occur at our plants: a. The temperature/pressure combination must be suitable to support decomposition. b. An ignition source must be provided to initiate, or start the decomposition.

Each of the following has been reported to initiate a nitrous oxide decomposition:

Open Flames Hot Surfaces Electric Arcs Rapid Gas Compression Mechanically or Statically-Produced Sparks Presence of Combustible Materials Exothermic Chemical Reactions”279

The Airgas process safety policy emphasizes the importance of avoiding sources of heat; stating: “… Never weld on a line containing nitrous oxide. Blow the line out with air prior to welding. Repair defective mechanical components such as compressor valves and pump seals promptly. When not operating properly, these devices can generate a great deal of heat. Pressurize 279 An exothermic chemical reaction produces heat.

CSB • Investigation Report • Airgas • Cantonment, Florida 100

nitrous oxide pressure vessels slowly. Rapid pressurization will generate a great deal of heat.” (Emphasis in the original.) 26. The policy also discusses contaminants that can “enhance the potential for decomposition” stating: Examples of these impurities include combustible materials such as hydrogen and hydrocarbons. In addition, nitrous oxide decomposition may occur more readily upon exposure to combustible solids such as activated carbon. Given these facts, it is important that combustibles be kept out of the process stream when possible. For example, do not use excessive pipe sealant or install new piping sections without removing any oil left from machining, etc. In those cases when it is not possible to eliminate the combustible material from the gas stream, special care must be taken in pressurizing vessels, performing maintenance, etc. 27. The Airgas process safety policy then discusses each section of the process where the process temperature and pressure are capable of starting a decomposition of nitrous oxide. Despite the long history of industry explosions during liquid nitrous oxide transfer operations, however, Airgas did not identify the trailer truck loading operation as an area where an explosive nitrous oxide decomposition reaction could occur.

  1. Trailer Loading Procedure

Although Airgas did not identify the potential for nitrous oxide decomposition during trailer loading in its process safety policy, the company did identify the hazard in its trailer loading procedure. In the company’s procedure, designed “to transfer nitrous oxide from plant storage tanks to bulk trailers for shipping,” Airgas detailed the steps to prepare for trailer loading. These steps included checks to ensure the trailer is ready to be loaded, hooking up the liquid and vapor hoses, purging the connections to remove air, and equalizing the storage tank vapor space with the trailer vapor space to ensure the two tanks are at approximately the same pressure. 29. Next, the loading procedure instructed the operator to “Open the proper pump suction valve.” To fill the pump with liquid (prime the pump), the procedures states: “Open pump bleed valve. When liquid has flooded the pump suction, the pump is cold and the discharge line is frosted. Liquid will come out of the pump bleed valve.” 30. Before the step instructing the operator to start the pump, the procedure cautions the operator that if the pump runs dry an explosion could occur. CAUTION: ENSURE PUMP IS PRIMED PRIOR TO STARTING THE PUMP. IF THE PUMP IS RUN DRY AND HEATS TO A TEMPERATURE THAT PROVIDES SUFFICIENT ENERGY TO DECOMPOSE NITROUS OXIDE AN EXPLOSION COULD OCCUR. (Bold and all caps in original.)

CSB • Investigation Report • Airgas • Cantonment, Florida 101 31. Although the company recognized the potential for an explosive nitrous oxide decomposition, Airgas provided no effective safeguards and simply instructed the operators to stop the pump if there was a “marked change in sound level.”280 After starting the pump, the procedure instructs the operator to monitor the change in pump sound level. The procedure states: IMPORTANT: IF THERE IS A MARKED CHANGE IN THE SOUND LEVEL OF THE PUMP, STOP THE PUMP IMMEDIATELY. DRY OPERATION OR CAVITATION IN THE PUMP COULD CAUSE THIS. THIS MAY OCCUR IF THE STORAGE TANK RUNS EMPTY OR THE INLET PIPING BECOMES BLOCKED OR OBSTRUCTED. (Bold and all caps in original.) 32. Rather than applying the hierarchy of controls and inherently safer design that could eliminate the pump, Airgas required the operator to be physically present and listen to the pump in order to prevent a nitrous oxide explosion.

  1. Airgas and Air Liquide Process Hazard Analysis

Recommending that Air Liquide perform a hazard analysis for its operations at Cantonment, before resuming production of nitrous oxide, is not enough to ensure safe facility operation. Although not subject to Federal process safety management regulations, Air Liquide did conduct hazard reviews of the Richmond and Donora nitrous oxide manufacturing processes. The CSB evaluated these hazard reviews and found similar problems in those PHAs that were found in – and contributed to – the Cantonment explosion. These problems include:  Similar to the ineffective run-dry interlock at Cantonment, at Richmond and Donora, critical safety interlocks did not conform with industry safety standards, such as ISA-84;  At Richmond and Donora, Air Liquide used a strainer as a flame arrestor, which failed at Cantonment; and  For Richmond and Donora, Air Liquide understated the consequences of a nitrous oxide explosion during trailer loading, and those facilities likely need additional safeguards. a) Hazard Analysis Guidance 34. OSHA safety guidance is important to protect workers even for chemical manufacturing processes that OSHA does not regulate with its Process Safety Management (PSM) rule, such as nitrous oxide. In OSHA’s Publication 3132, introduced above, the agency highlighted the importance of a process hazard analysis and explained the basic concept. OSHA stated:

280 Cavitation in a pump refers to the formation of vapor bubbles when the liquid pressure falls below its vapor pressure. See water pump cavitation video [237].

CSB • Investigation Report • Airgas • Cantonment, Florida 102

The key provision of PSM is process hazard analysis (PHA)—a careful review of what could go wrong and what safeguards must be implemented to prevent releases of hazardous chemicals.281 35. In its Guidelines for Risk Based Process Safety, CCPS describes the fundamental concept of hazard analysis. The CCPS guidance states: Hazard Identification and Risk Analysis (HIRA) is a collective term that encompasses all activities involved in identifying hazards and evaluating risk at facilities, throughout their life cycle, to make certain that risks to employees, the public, or the environment are consistently controlled within the organization's risk tolerance. These studies typically address three main risk questions to a level of detail commensurate with analysis objectives, life cycle stage, available information, and resources. The three main risk questions are:  Hazard - What can go wrong?  Consequences - How bad could it be?  Likelihood - How often might it happen? 282 b) Lack of Hazard Analysis of Cantonment Process 36. Although nitrous oxide manufacturing at Cantonment began in 1982, none of the companies who owned and operated the plant ever performed a hazard analysis of the process. Neither applicable good practice industry standards nor government regulations required performing a formal process hazard analysis at the Airgas facility in Cantonment. Nevertheless, good process safety practice includes performing a rigorous hazard analysis in the circumstances presented. 37. Puritan-Bennett owned the Richmond nitrous oxide manufacturing plant at the time the company started construction of the Cantonment facility; however, the Cantonment process design did not implement important lessons learned from the 1980 nitrous oxide explosion at the Richmond facility. These lessons include:  Provide at least five feet of liquid above the pump to ensure an adequate liquid supply to the pump;  Use both a strainer and a metallic flame arrestor on each side (inlet and outlet) of the pump;  Install a safety interlock to shut the pump motor off when there is low motor load (power consumption); and

281 See OSHA Publication 3132, Process Safety Management (2000) [132]. 282 See Guidelines for Risk Based Process Safety at Section 9 [105].

CSB • Investigation Report • Airgas • Cantonment, Florida 103  Construct piping to circulate liquid back to the storage tank during initial starting and cool down of the pump. 38. Air Liquide owned and operated the Cantonment facility for three months before the August 28, 2016 incident. Although likely required by applicable Air Liquide policies, which Air Liquide did not share with the CSB, the company did not complete or develop a plan to perform a process hazard analysis on the nitrous oxide manufacturing operations at the Cantonment, Florida facility. c) Air Liquide Process Hazard Reviews at Richmond and Donora 39. Air Liquide performed an analysis of process safety hazards for the Richmond, California and Donora, Pennsylvania nitrous oxide manufacturing facilities, which the company owned since

  1. Even if Air Liquide conducted a similar hazard analysis for the nitrous oxide transfer and

trailer truck loading operations at Cantonment, the company may not have prevented the August 28, 2016 incident. Reasons supporting this conclusion include:  Air Liquide hazard analyses for its Richmond, California and Donora, Pennsylvania facilities show similar risks for a nitrous oxide explosion during trailer loading as the Cantonment facility;  Although Richmond and Donora did have run-dry safety interlocks that may meet CGA standards, neither site employed ISA-84;  At Richmond and Donora, Air Liquide used a strainer as a flame arrestor, which failed at Cantonment;  Despite the 1980 explosion at Richmond, the Air Liquide hazard reviews for both Richmond and Donora understated the consequences of a nitrous oxide explosion during trailer loading, and each facility likely needs additional safeguards. 40. As part of the CSB’s investigation into the Cantonment incident and before Air Liquide divested the Richmond and Donora facilities to Matheson, the agency requested Air Liquide safety information for all of its nitrous oxide manufacturing facilities. Although the company allowed CSB investigators to review recent process hazard analyses for the Richmond and Donora facilities, Air Liquide declined to cooperate and failed to allow the CSB to retain this important safety information for additional analysis. This information could have aided the CSB’s mission by providing a better understanding of nitrous oxide safety hazards in order to make more effective safety recommendations to protect both workers and the public.283 41. CSB’s review of these safety records focused primarily on hazards associated with loading operations – specifically, transferring liquid nitrous oxide from a storage tank to a trailer truck.

283 Air Liquide uses the name Accident Risk Assessment (ARA) for its hazard review.

CSB • Investigation Report • Airgas • Cantonment, Florida 104

Air Liquide process hazard analysis records listed safeguards to protect against an explosive nitrous oxide decomposition reaction. These safeguards include:  Use pumps certified for liquid nitrous oxide;  Low speed pumps are preferred;  The pump mounting and piping must be free of stress;  The [pump] motor must be protected against overloads; and  Install an automatic shutoff that allows the pump to operate only after it has been properly cooled down and filled with liquid to prevent cavitation.284

Similar to the Cantonment facility, the Richmond and Donora hazard review documents revealed that these sites also considered the automatic pump shutoff as a safety device. Like at Cantonment, Air Liquide does not consider these critical safety devices to be safety instrumented functions and the facilities did not appear to apply the industry standard – ISA-84 – to the design of these critical safety systems. As a result, by applying important industry safety standards like ISA-84 to the Richmond and Donora sites, these facilities can likely reduce the risk of a nitrous oxide explosion.

At Richmond and Donora, Air Liquide also used strainers as flame arrestors. Air Liquide filled these strainers with stainless steel mesh. Because the hazard analysis indicates no risk reduction credit for these devices – they were not considered safeguards – it is unlikely that the company conducted testing of these strainers to ensure they can stop a nitrous oxide decomposition reaction.

For Richmond and Donora, Air Liquide used a risk matrix to evaluate process hazards to ensure that available safeguards drive risk down to appropriate company risk targets. Evaluation of these risk assessments revealed that both facilities considered the potential consequence of an explosion resulting from overheating the nitrous oxide pump to be a severity-level 3 event – serious damage to the facility with the potential for injury. As such, Air Liquide concluded having an automatic pump shutoff device adequately controlled the risk of this hazard, despite the pump shutoff not meeting the ISA-84 industry safety standard.

Air Liquide considers a severity-level 4 consequence event as a “major accident” with the potential for multiple fatalities and massive facility destruction. This higher severity category more appropriately aligns with past nitrous oxide decomposition incidents that caused major damage and could have killed multiple workers. In its 1980 investigation report for the Richmond incident, the explosion damage was so extensive that Puritan-Bennett described the lack of physical harm to the operator as a miracle.285 284 Information provided by Air Liquide did not include the type of nitrous oxide pump used. The CSB does not know how the Richmond and Donora sites modified their process to address phasing out the Smith gear pumps. At Cantonment, Airgas used centrifugal pumps that operated at roughly twice the speed as the Smith pump with 20 percent more flow. 285 See [20] at page 18.

CSB • Investigation Report • Airgas • Cantonment, Florida 105 47. Before the Cantonment incident, Air Liquide’s nitrous oxide explosion in Moncada, Spain was the most recent similar tragedy. Consistent with a severity-level 4 consequence, the Moncada explosion killed one worker and injured five others.286 In light of the facts of the current incident, including the death of the only Airgas employee on-site and the total loss of the Airgas Cantonment facility, a severity-level 4 is likely a more accurate categorization, rather than a severity-level 3. 48. By applying a severity-level 4 consequence to potential explosive nitrous oxide decomposition hazards in company hazard analyses, Air Liquide likely needed additional safeguards to achieve company risk targets. These additional layers-of-protection, which Air Liquide lacked, could have driven risk lower and reduced the potential for a major nitrous oxide explosion. 49. In its Guidelines for Risk Based Process Safety, CCPS describes the importance of performing a hazard analysis. The CCPS guidance states: To manage risk, hazards must first be identified, and then the risks should be evaluated and determined to be tolerable or not. The earlier in the life cycle that effective risk analysis is performed, the more cost effective the future safe operation of the process or activity is likely to be. The risk understanding developed from these studies forms the basis for establishing most of the other process safety management activities undertaken by the facility. An incorrect perception of risk at any point could lead to either inefficient use of limited resources or unknowing acceptance of risks exceeding the true tolerance of the company or the community. 50. Airgas should develop and implement a program to ensure the company conducts a hazard analysis of its nitrous oxide manufacturing business using good practice guidance, such as the CCPS Guidelines for Risk Based Process Safety. This program should ensure an appropriate evaluation of potential consequences and require inherently safer design where feasible. In addition, the hierarchy of controls should guide safeguard selection when establishing recommendations to lower the risk of process safety hazards.

  1. Management of Change

In its Guidelines for Risk Based Process Safety, CCPS discusses the importance of performing a safety review of proposed process modifications. The CCPS guidance states: If a proposed modification is made to a hazardous process without appropriate review, the risk of a process safety accident could increase significantly.287

286 See Spain News Article [123]. Note – use Google Chrome for an English translation. 287 See Guidelines for Risk Based Process Safety at Section 15.1.2 [105].

CSB • Investigation Report • Airgas • Cantonment, Florida 106

In its process safety management standard, OSHA stated: “[C]ontemplated changes to a process must be thoroughly evaluated to fully assess their impact on employee safety and health and to determine needed changes to operating procedures.”288

To comply with Federal FDA rules for Good Manufacturing Practices, Airgas developed a management of change (MOC) program. This program, however, only focuses on changes that could affect product quality and does not attempt to evaluate or control process safety hazards, such as nitrous oxide decomposition.

CGA G-8.3–2016 addresses the need to perform a management of change and a risk assessment for equipment modifications. The standard states: Modifications to a nitrous oxide installation or nonroutine maintenance work shall not be made without a risk assessment, which could result in a management of change and requirement for a work permit […].289 (Emphasis removed from original.)

When the company needed to find a replacement nitrous oxide transfer pump, it did not perform a management of change review to identify and control process safety hazards. Despite the Airgas MOC program requirements that include performing a review when “addition or removal of equipment” changes are proposed, the company did not perform such a review when the Cryostar or ACD pumps were purchased, installed, or operated.

When compared to the Smith pump that was in service for more than 30 years, the Cryostar and ACD pumps introduced changes that could increase the risk of an explosion from a nitrous oxide decomposition reaction. These changes included:  A twenty percent increase in the flow rate, which increases the risk of dry run conditions;  Doubling of the pump speed, which can increase the heating rate of pump components in dry run conditions;  Increase in liquid pressure required (NPSH) 290 to the pump, which can affect pump reliability and increase the risk of dry run conditions; and  Introducing a new y-strainer design using a less robust strainer basket and in addition, creating an unknown pressure drop291 which could also increase the risk of dry run conditions. 288 See OSHA Publication 3132, Process Safety Management (2000) [132]. 289 See [150], Section 5.10. 290 Pump manufacturers express the required inlet liquid pressure as feet of net positive suction head (NPSH). 291 While strainer manufacturers provide pressure drop information for an empty strainer, no manufacturer provides this information for a strainer “completely packed” with steel wool. Neither the amount or grade of steel wool used nor the packing method is controlled and Airgas never measured the pressure drop. As a result, the pressure drop across the steel wool-packed y- strainer remains unknown, but is likely substantial.

CSB • Investigation Report • Airgas • Cantonment, Florida 107 57. To prevent nitrous oxide explosions, Airgas should develop and implement a program to ensure that the company conducts a robust management of change and risk assessment for its nitrous oxide manufacturing business using good practice guidance, such as the CCPS Guidelines for Risk Based Process Safety.

  1. Industry Standards

Airgas management did not implement important aspects of industry safety standards, despite the fact that chemical industry good practice guidance clearly states the need to maintain knowledge and conformance with such standards to maintain a safe facility. 59. Although Airgas participated in the development of the CGA G-8.3 safety standard, the company is not following important aspects of the standard, including:  Designing equipment so that nitrous oxide is not released into the work environment from venting (CGA G-8.3–2016, Section 4.4.3);  Using strainers constructed from high nickel or copper alloys (CGA G-8.3– 2016, Section 5.4);  Preventing metallic particles from being present in nitrous oxide equipment (CGA G-8.3–2016, Section 5.5);  Verifying that equipment is bonded and electrically grounded to prevent static electricity from initiating a nitrous oxide decomposition reaction (CGA G-8.3– 2016, Section 5.7, 6.1.3, 7.3.4, and 8.2);  Preventing heating of equipment above 300 °F by all practical means (CGA G- 8.3–2016, Section 5.7);  Providing automatic controls to protect equipment from operating at excessive temperatures (CGA G-8.3–2016, Section 5.7);  Performing management of change and risk assessments on process modifications (CGA G-8.3–2016, Section 5.10);  Providing an interlock to ensure proper liquid filling and pump cooling before the pump can start (CGA G-8.3–2016, Section 7.4.3);  Preventing pumps from operating if they lose prime (CGA G-8.3–2016, Section 5.7);  Using a pump suction filter with as “little pressure drop as possible” (CGA G- 8.3–2016, Section 7.4.1);  Verifying that pump inlet pressure (NPSH)292 meets manufacturer requirements (CGA G-8.3–2016, Section 8.2); and

292 Pump manufacturers express the required inlet liquid pressure as feet of net positive suction head (NPSH).

CSB • Investigation Report • Airgas • Cantonment, Florida 108

 Monitoring pump outlet pressure to ensure the pump operates within specified conditions (CGA G-8.3–2016, Section 8.2). 60. In its Guidelines for Risk Based Process Safety, CCPS discusses the importance of having a program to stay current with industry standards. The CCPS guidance states: Knowledge of and conformance to standards helps a company (1) operate and maintain a safe facility, (2) consistently implement process safety practices, and (3) minimize legal liability. Changes in standards may occur at irregular intervals or on a fixed schedule, and the standards system must keep up with such changes so the company can adjust its compliance activities. The standards system also forms the basis for the standards of care used in an audit program to determine management system conformance.293 61. As previously described, OSHA identifies ISA-84 as recognized and generally accepted good engineering practice. Airgas management acknowledged to CSB investigators that the company does not follow ISA-84. As a result, the company’s run-dry safety interlock intended to protect workers and the public from nitrous oxide decomposition hazards proved ineffective. 62. Airgas should develop and implement a program to ensure the company identifies and applies relevant industry safety standards to its nitrous oxide manufacturing business using good practice guidance, such as the CCPS Guidelines for Risk Based Process Safety.

  1. Process Safety Information

CCPS defines Process Safety Information (PSI) as: Physical, chemical, and toxicological information related to the chemicals, process, and equipment. It is used to document the configuration of a process, its characteristics, its limitations, and as data for process hazard analyses.294, 295 64. OSHA explains the importance of Process Safety Information in its PSM guidance publication. OSHA states: Complete and accurate written information concerning process chemicals, process technology, and process equipment is essential to an effective process safety management program and to a process hazard analysis.296

293 See Guidelines for Risk Based Process Safety at Section 4 [105]. 294 See CCPS Guidelines for Implementing Process Safety Management [103]. 295 Id., at Glossary. 296 See OSHA Publication 3133, Process Safety Management Guidelines for Compliance (1994) [131].

CSB • Investigation Report • Airgas • Cantonment, Florida 109 65. For example, for covered processes, OSHA requires companies to have Process Safety Information on the equipment in the process. Among other things, this information must include:  Materials of construction;  Piping and instrument diagrams (P&IDs);  Relief system design and design basis; and  Safety systems, such as interlocks.297 66. At Airgas, although not a federally regulated process, the CSB found this critical safety information was either lacking or not maintained, despite the clear dangers presented by nitrous oxide and the importance of maintaining, updating, and relying on this critical safety-related information. 67. The company’s safety information for critical components, such as y-strainers and steel wool intended to stop nitrous oxide decomposition, does not identify the materials of construction. 68. Although the company developed piping and instrument diagrams for the process, Airgas does not maintain the accuracy of these engineering documents. For example, Airgas never added the second nitrous oxide pump information when the company installed the Cryostar pump, nor when the ACD pump replaced the Cryostar pump. 69. In addition, Airgas piping and instrument diagrams do not identify important safety instruments, such as the scale indication used by operators to determine when the storage tanks contained enough nitrous oxide inventory to begin loading a trailer truck. 70. No Airgas engineering documents detail the run-dry safety interlock configuration, nor do they illustrate or explain how the company modified this interlock when Airgas installed the Cryostar or ACD pumps. 71. Furthermore, Airgas lacks documentation for the relief valve design and design basis for the relief valves on the discharge of the Smith and ACD pumps. 72. Effective management of chemical reactivity hazards, such as nitrous oxide decomposition, requires extensive process knowledge – complete and accurate process safety information.298 Airgas should evaluate which of its nitrous oxide engineering and safety documents contain essential process safety information and develop a comprehensive information management system to ensure this documentation is available, accurate, and maintained.

  1. Need for Additional Technical Personnel

Airgas did not have any technical personnel located at the Cantonment facility. The CSB’s investigation of the August 28, 2016, explosion at Cantonment revealed many problems that stem from a lack of technical personnel. More technical, engineering-focused staff at the facility, on a

297 See OSHA Publication 3132, Process Safety Management (2000) [132]. 298 See Guidelines for Risk Based Process Safety at Section 8.1.2 [105].

CSB • Investigation Report • Airgas • Cantonment, Florida 110

more consistent basis, providing support and other resources for the site while developing greater familiarity with all facility processes, equipment, and operations for the technical personnel, could have addressed or at least alleviated numerous problems, including:  Many examples of not following the industry safety standard CGA G-8.3 (see Industry Standards, paragraph 59);  Not applying ISA-84 to safety instrumented functions (interlocks);  Not evaluating or applying the publicly available safety recommendations issued by Scaled Composites in 2009 (see Gaps in Air Liquide (Airgas) Nitrous Oxide Safety Knowledge, paragraph 11);  Reliance on equipment manufacturers to perform pump system engineering;  Providing incorrect process data to pump manufacturers;  Not following pump manufacturer recommendations;  Lack of a preventive maintenance program for nitrous oxide pumps;  Not ensuring an adequate minimum storage tank level;  Having no automatic process control for trailer truck loading;  Lack of an electrical bonding and grounding program to ensure trailer truck loading safety;  Not identifying the nitrous oxide loading pumps, flame arrestors, and run-dry interlock as critical equipment;  Lack of an inspection program for nitrous oxide flame arrestors;  Putting workers at risk when testing the run-dry safety interlock;  Using a potentially incompatible O-ring in a nitrous oxide relief valve;  Not having a design basis for safety relief valves; and  Allowing block valves to isolate relief devices in situations that do not adhere to industry safety standard requirements. 74. To ensure the effective management of chemical reactivity hazards, CCPS industry consensus guidance advises companies to ensure that technical resources are readily available to identify chemical reactivity hazards, acquire needed data, assess risk, and develop safeguards.299 a) Relief Device Isolation Not Allowed by Industry Safety Standard 75. The American Petroleum Institute (API) is an industry trade association that develops standards and recommended practices for the oil and natural gas industry.300 These publications apply to chemical

299 See Essential Practices for Managing Chemical Reactivity Hazards at Chapter 4 [100]. 300 See API Web Site [167].

CSB • Investigation Report • Airgas • Cantonment, Florida 111 facilities, including the Airgas facility in Cantonment, Florida. At the time of the, the sixth edition (2014) of the API Standard 521, Pressure-Relieving and Depressuring Systems (“API 521-2014”) was the recognized and generally accepted good engineering practice (RAGAGEP) for pressure relieving and disposal systems. 76. The Smith nitrous oxide transfer pump is a positive displacement pump that can generate high pressure. API 521-2014 states: The inadvertent closure of a valve on the outlet of pressure equipment while the equipment is on stream can expose the equipment to a pressure that exceeds the MAWP [maximum allowable working pressure]. Every valve (i.e. manual, control, or remotely operated) should be considered as being subject to inadvertent operation. If closure of an outlet valve can result in pressure in excess of that allowed by the design code, a PRD [pressure relief device] is required.301 77. As shown in Figure 59, Airgas installed an isolation block valve on the discharge of the Smith pump. The inadvertent closure of this valve can expose this equipment to pressure that exceeds the maximum allowable pressure. The relief valve on the Smith pump discharge piping, however, is located downstream of the isolation block valve and thus may not be available to protect the equipment as required by API 521-2014.

301 See [218], Section 4.4.2.1.

CSB • Investigation Report • Airgas • Cantonment, Florida 112

Figure 59. Photo of the Smith nitrous oxide pump discharge piping. From the outlet of this positive displacement pump, there is an isolation block valve upstream of the relief valve. As a result, the equipment may not be adequately protected from a scenario where this isolation valve was inadvertently closed while operating the pump. b) Use of Teflon Gaskets 78. The ACD pump manual specifies the appropriate gaskets as “either bonded fiber type or spiral wound metallic type.” ACD specifically prohibits the use of polytetrafluoroethylene (Teflon) sheet gaskets in its pump manual. The ACD pump manual states “Do not use sheet TFE [tetrafluoroethylene] or PTFE [polytetrafluoroethylene] as gasket material since they exhibit high creep [deformation] rates.”302 Nevertheless, Airgas used Teflon gaskets in ACD pump flanges, despite ACD’s prohibition on use. Moreover, Airgas did not perform an engineering analysis to evaluate the use of Teflon sheet gaskets in its nitrous oxide loading equipment. 79. As seen in Figure 60, the Teflon gasket appears to exhibits telltale signs of creep, with the left- center portion stretched and thinned, because of the material being under pressure, and then deforming the gasket, developing a tear.

302 See Chemours information about Teflon [61]. Creep is a time dependent deformation process.

CSB • Investigation Report • Airgas • Cantonment, Florida 113

Figure 60. A Teflon gasket used by Airgas to seal nitrous oxide loading equipment connections. This gasket was installed on the discharge of the ACD pump. Creep (deformation) likely developed a tear in the gasket seen here where the blue background is visible between the 9 and 11 o’clock positions. c) Management Oversight 80. Airgas management could have prevented or remedied such problems by supplementing its workforce, with additional technical staff and by expanding the responsibilities of technically oriented corporate safety staff with additional time spent on the ground auditing, inspecting, and evaluating nitrous oxide facilities and operations, including Cantonment.303 81. Even the plant manager at Cantonment likely would have benefited from additional technical resources. He started with Airgas as an operator, a position he held for a year, until transitioning to maintenance for a number of years, when Airgas promoted him to plant manager. In his role, the plant manager appeared to have no specialized technical training relating to nitrous oxide, other than what he learned by working at the Cantonment facility. If Airgas had provided adequate training on how to conduct certain operations safely at the facility, the plant manager and other staff at Cantonment would have learned how to do things in accordance with Airgas policy and procedure, but may not have necessarily understood why things should be done in a certain way.304 82. Furthermore, in this position, the plant manager reported to the general manager of the company, a chemical engineer by trade and training, who works in the Kansas City area. The plant manager

303 These type of issues are reminiscent of the Esso gas plant explosion in Longford, Australia, where technical, engineering focused resources at the plant were lacking, and causal to this highly publicized industrial incident. Six years before to the incident, Esso chose to relocate its engineering workforce from onsite at Longford to Melbourne, where engineers provided support to the operators from a distance, but only when operators felt the need to contact them by telephone for help. In Lessons from Longford, Professor Andrew Hopkins describes the effect of this absence of technical support on the ground saying: “Perhaps predictably, these arrangements did not work effectively, and … the absence of engineering expertise had certain long- term consequences which contributed to the accident.” [62], page 34. 304 See Lessons from Esso’s Gas Plant Explosion at Longford [149].

CSB • Investigation Report • Airgas • Cantonment, Florida 114

consulted with his manager at least weekly, and often daily, but usually by telephone. The general manager also only visited the site one to three times per year, including a mandatory annual safety meeting. 83. In this context, some responsibility for providing additional technical support could fall to the Airgas corporate safety function. The annual safety audit, however, conducted by a corporate Airgas safety official, lacked a process safety focus. This annual safety audit did not require her to delve into deeper aspects of the site’s safety systems; rather, through a question and answer model, corporate practices required her to evaluate compliance with existing company policies. The Airgas audit program did not challenge the status quo with respect to existing, and in some cases long-standing, process safety issues. 84. Airgas should strengthen technical staffing to ensure nitrous oxide processing hazards are appropriately identified, evaluated, managed, and controlled. Furthermore, the company should enhance its auditing practices as part of a long-term process safety management system.

  1. Industry Process Safety Management Guidance

CCPS defines process safety as: A disciplined framework for managing the integrity of operating systems and processes handling hazardous substances by applying good design principles, engineering, and operating practices. It deals with the prevention and control of incidents that have the potential to release hazardous materials or energy. Such incidents can cause toxic effects, fire, or explosion and could ultimately result in serious injuries, property damage, lost production, and environmental impact.305 86. The CCPS approach to Process Safety Management (PSM) is based on four pillars:

  1. Commit to process safety
  2. Understand hazards and risk
  3. Manage risk
  4. Learn from experience306

CCPS states that these four pillars “… reflect 15 years of PSM implementation experience and well-established best practices from a variety of industries.”307

305 See CCPS Guidelines for Implementing Process Safety Management [103], Glossary. 306 See Four Pillars of Process Safety Management [122]. 307 See Guidelines for Implementing Process Safety Management [103], Preface.

CSB • Investigation Report • Airgas • Cantonment, Florida 115 88. Although these four PSM pillars are well established, the CSB investigation of this incident revealed that they are lacking at Airgas. Airgas has significant safety gaps in the operational areas represented by these four pillars, which must be addressed to improve safety. a) Guidelines to Implementing Process Safety Management 89. In June 2016, CCPS released a new edition of its Guidelines to Implementing Process Safety Management.308

The goal of these guidelines is “Ensuring that people can return home healthy and uninjured at the end of each workday, ensuring that our neighbors are unharmed, and having a safe work environment have driven many companies to pursue PSM implementation with the objective of having zero incidents.”309 CCPS states: “It is that goal for which this guideline was developed - to help companies pursue and achieve the ‘perfect process safety’ vision of zero harm.”310

The primary purpose of these guidelines is to: [P]rovide an update to the original Guidelines for Implementing Process Safety Management Systems, recognizing that most companies now have some form of PSM system, but that a number of companies, especially smaller companies or those in developing countries, may need a road map of how to efficiently and effectively upgrade their systems.311

By effectively applying the CCPS Guidelines to Implementing Process Safety Management, Airgas can develop a program to manage nitrous oxide decomposition hazards and prevent future nitrous oxide explosions. 308 Id. 309 Id., at Section 1. 310 Id., at Section 1. 311 Id., at Section 1.

CSB • Investigation Report • Airgas • Cantonment, Florida 116

b) The Business Case for Process Safety 93. In 2006, CCPS published a seminal work outlining the results of a study called The Business Case for Process Safety.312 In that study, CCPS asserts that a hallmark of its member companies is that each “have adopted a rigorous philosophy regarding process safety.”313

CCPS argues that the lessons of this study will help any business in four key measures of business performance: corporate responsibility, risk reduction, business flexibility and sustained value, and that good process safety practices amounts to good business. In particular, with respect to risk reduction, CCPS notes: Process safety provides unparalleled capacity for enhanced risk reduction. Your company’s risk exposure is reduced in the following areas when well-founded process safety systems are in place. ■Lives are saved and injuries are reduced — Both the personal impact of human loss and cost of deaths or injuries are painful. A solid process safety program can help prevent these costs. ■Property damage costs are reduced — In the U.S., major industrial incidents cost an average of $80 million each. ■Business interruptions are reduced — These losses can amount to four times the cost of the property damage from an incident. ■Loss of market share is reduced — After an incident, this loss continues until the company’s reputation is restored. Adverse publicity and negative public image can have insurmountable effects. ■Litigation costs are reduced — These are unavoidable after an incident and can total five times the cost of the regulatory fines. 312 See The Business Case for Process Safety [63]. 313 Id., at page 3.

CSB • Investigation Report • Airgas • Cantonment, Florida 117 ■Incident investigation costs are reduced — Investigating an incident and implementing corrective actions can cost millions of dollars. ■Regulatory penalties are reduced — For many incidents, a fine after litigation can total 1 million dollars or more. ■Regulatory attention is reduced — A major incident usually results in increased regulatory audits and inspections.314 95. As a corporate member of CCPS, Air Liquide should implement a robust process safety program following the CCPS Guidelines for Implementing Process Safety Management for its nitrous oxide business to manage nitrous oxide decomposition hazards and prevent future nitrous oxide explosions. VII. Industry Safety Management System Standard 1. As noted above, the CSB reiterates the importance of its two previous recommendations issued to OSHA with respect to reactive chemical hazards. The Airgas incident, however, revealed another reactive chemical safety gap that exists within the nitrous oxide industry. In this instance, however, the CSB concludes that this existing gap may be better addressed outside of a regulatory change. Specifically, the CSB recommends that the nitrous oxide industry, through the Compressed Gas Association and that organization’s member companies, develop its own process safety management system standard to manage and control nitrous oxide decomposition hazards and prevent explosions. This recommendation is similar to the approach taken by the National Transportation Safety Board’s efforts to encourage relevant industry stakeholders, led by the American Petroleum Institute, to develop a process safety management standard for the pipeline industry in that agency’s investigation of the Enbridge Pipeline rupture, which followed at least one other significant pipeline accident in San Bruno, California.315, 316 2. The CSB is recommending that the nitrous oxide industry should develop its own process safety management system standard to manage and control nitrous oxide decomposition hazards and prevent explosions.

314 Id., at page 8. 315 See NTSB Investigation of Enbridge Pipeline Rupture at page 117 [110]. On July 25, 2010, a segment of a 30-inch-diameter pipeline, owned and operated by Enbridge Incorporated (Enbridge) ruptured in a wetland in Marshall, Michigan. The rupture released nearly 850,000 gallons of crude oil. The oil saturated the surrounding wetlands and flowed into the Talmadge Creek and the Kalamazoo River. Local residents self-evacuated from their houses, and the spill negatively affected the environment. Cleanup efforts exceeded $767 million. About 320 people reported symptoms consistent with crude oil exposure, though the spill cased no fatalities. 316 See NTSB Investigation of San Bruno Pipeline Rupture and Fire [64]. On September 9, 2010, a 30-inch-diameter segment of an intrastate natural gas transmission pipeline known as Line 132, owned and operated by the Pacific Gas and Electric Company, ruptured in a residential area in San Bruno, California. The rupture released an estimated 47.6 million standard cubic feet of natural gas. The released natural gas ignited, resulting in a fire that destroyed 38 homes and damaged 70. Eight people were killed, many were injured, and many more were evacuated from the area.

CSB • Investigation Report • Airgas • Cantonment, Florida 118

A. NTSB Investigation of Enbridge Pipeline Rupture 3. In July 2012, the National Transportation Safety Board (NTSB) completed its investigation of the July 25, 2010, Enbridge Inc. pipeline rupture in Marshall, Michigan. 4. In its report, the NTSB concluded, “that pipeline safety would be enhanced if pipeline companies implemented SMSs [safety management systems].”317 5. The NTSB stated: The evidence from [the Enbridge] accident and from the San Bruno accident indicates that company oversight of pipeline control center management and operator performance was deficient. In both cases, pipeline ruptures were inadequately identified and delays in identifying and responding to the leaks exacerbated the consequences of the initial pipeline ruptures.318, 319 6. The NTSB found that Enbridge management systems did not focus on pipeline operations. For example, the company considered control center errors to be caused by employees rather than as system deficiencies, contrary to safety management system guidelines. The NTSB concluded: Had the company implemented and maintained a comprehensive SMS, it would have focused not only on field operations safety, but also would have incorporated control center operations, pipeline integrity management, and [post-accident] response plans and a comprehensive continuous examination of the safety of pipeline operations.320 7. The NTSB identified API as the appropriate group to drive positive safety change through the development of a safety management system standard for the pipeline industry, rather than recommending Federal rulemaking by a regulator. The NTSB stated: Because of the improvements to safety that accrue from the use of a comprehensive SMS, the NTSB recommends that the API facilitate the development of an SMS standard specific to the pipeline industry that is similar in scope to the API’s RP 750, Management of Process Hazards. The development should follow established American National Standards Institute requirements for standard development.321

317 See NTSB Investigation of Enbridge Pipeline Rupture at page 117 [110]. 318 Id., at page 117. 319 See NTSB Investigation of San Bruno Pipeline Rupture and Fire [64]. 320 See NTSB Investigation of Enbridge Pipeline Rupture at page 115 [110]. 321 Id., at page 117.

CSB • Investigation Report • Airgas • Cantonment, Florida 119 8. As the result of an NTSB safety recommendation, the American Petroleum Institute (API) developed API Recommended Practice 1173, Pipeline Safety Management Systems (API RP 1173), which could serve as a model for the nitrous oxide industry.322 9. Among the stated goals of API RP 1173 is to: [P]rovide pipeline operators with a framework to review an existing PSMS [pipeline safety management system] or develop and implement a new PSMS. Newly developing or improving a PSMS will enhance effectiveness of risk management and enable continual improvement of pipeline safety performance. The framework builds upon an operator’s existing pipeline safety management programs by drawing upon industry experiences, lessons learned, and existing standards. The intent of the framework is to comprehensively define managerial elements that can identify, manage and reduce risk throughout the entirety of a pipeline’s lifecycle and, at the earliest stage, help prevent or mitigate the consequences of an unintended release or abnormal operations. Particular emphasis is placed on increased proactivity, thinking of what can go wrong in a systemic manner, clarifying safety responsibilities throughout the pipeline operator’s organization (including contractor support), the important role of senior management and leadership at all levels, encouraging the non-punitive reporting of and response to safety concerns, and providing safety assurance by regularly evaluating operations to identify and address risks. These factors work together to make safety programs and processes more effective, comprehensive, and integrated.323 10. In a press release announcing the development of API RP 1173, the NTSB lauded: API formed a multi-stakeholder group including oil and gas pipeline operator personnel and trade association staff, other federal and state agency personnel, and safety experts representing the public. The group met monthly, surveyed the public and created an important framework for the pipeline industry's goal of continuous safety improvement.324 11. In doing so, API exceeded the NTSB’s recommendation in a positive fashion, going beyond merely facilitating the development of a safety management system standard specific to the pipeline industry, but also addressed safety culture and other safety-related issues in the new recommended practice.325

322 API issued the first edition of API 1173 in July 2015 to address the 2012 NTSB safety recommendation. See API RP 1173 [219]. 323 See API RP 1173 at page x [219]. 324 See NTSB Press Release on API 1173 [65]. 325 Id.

CSB • Investigation Report • Airgas • Cantonment, Florida 120

In an address to the American Gas Association, NTSB Chairman Christopher Hart further explained the NTSB’s view about the success and strength of API RP 1173: We generally endeavor in our recommendations to set the bar pretty high and encourage “stretch” thinking, so very rarely do recommendation recipients exceed what we recommend. Thus, I am pleased to report that when API issued RP 1173, we closed our recommendation as ‘exceeds recommended action.’326

All told, the NTSB achieved a great success with respect to the development and publication of this particular API standard. The CSB would like to model the NTSB’s success in this matter with the broad-based development and publication of a new CGA standard, similarly focused, though rooted in CCPS guidance (which the CSB finds more rigorous) than in API 750.327 B. Need for Process Safety Management System Standard

With respect to reactive chemical hazards, such as explosive nitrous oxide decomposition, former CSB Chair Carolyn Merritt stated, “Much progress has been made in chemical process safety since the Bhopal accident in 1984, but deaths and injuries continue to occur from uncontrolled chemical reactions and significant gaps remain in Federal regulations and industry programs to control reactive hazards. It’s time to redouble our efforts to prevent these tragedies.”328

A history of devastating and preventable accidents that caused several fatalities and injuries, as well as significant property damage, demonstrates that nitrous oxide reactive hazards are a real and recurring issue, both in the United States and around the world.

The evidence from the history of nitrous oxide explosions indicates that company oversight of nitrous oxide reactivity hazards has been and remains deficient. Nitrous oxide manufacturing should benefit from an industry-specific standard or recommended practice focused on the creation of robust safety management systems in the same fashion that API RP 1173 served the needs of the pipeline industry in the aftermath of the Enbridge pipeline disaster.329

Therefore, the CSB concludes that implementing a robust safety management system for nitrous oxide manufacturing would enhance safety. 326 See NTSB Chairman Christopher Hart Keynote Speech [66]. 327 Although API exceeded the NTSB’s recommendation in developing API 1173, API modeled this standard using API 750, which the CSB previously analyzed as not being as rigorous as the approach recommended by CCPS. In its Macondo investigation report, the CSB identified that the API approach contains fewer management elements than the CCPS approach. Although the management systems used by API are important, the CSB stated, “[T]hey fall short of the more rigorous approach taken by the Center for Chemical Process Safety (CCPS), which details additional elements that include process safety culture, management review and continual improvement, workforce involvement, and measurement and metrics.” See CSB's Macondo Investigation Report - Volume 4 at page 20 [232]. 328 See CSB Safety Video: Reactive Hazards at 19:25 [228]. 329 See PHMSA Presentation on API RP 1173 Implementation [67].

CSB • Investigation Report • Airgas • Cantonment, Florida 121 18. In its 2007 Guidelines for Risk Based Process Safety, CCPS noted using a “management system approach to process safety management” was widespread.330 CCPS also stated: Using the same high-intensity practices to manage every hazard is an inefficient use of scarce resources. A risk-based approach reduces the potential for assigning an undue amount of resources to managing lower- risk activities, thereby freeing up resources for tasks that address higher- risk activities.331 19. By following a risk-based approach to managing process safety, CCPS concluded that companies will be encouraged to:  Evolve their approach to accident prevention from a compliance-based to a risk-based strategy.  Continuously improve management system effectiveness.  Employ process safety management for non-regulatory processes using risk- based design principles.  Integrate the process safety business case into an organization's business processes.  Focus their resources on higher risk activities.332 20. In its Essential Practices for Managing Chemical Reactivity Hazards, CCPS provides guidance for developing management systems that focus on the “less-obvious nature of chemical reactivity hazards” needed to prevent reactive incidents, such as nitrous oxide explosions.333 21. The CGA facilitates the development and maintenance of consensus standards for the nitrous oxide manufacturing industry in the U.S. and Canada. To prevent future nitrous oxide explosions in the U.S., the CSB recommends that the CGA facilitate the development of a robust safety management system standard applicable to nitrous oxide manufacturing with the goal of preventing future nitrous oxide explosions. The development should build upon the CCPS management system model and follow established American National Standards Institute requirements for standard development. VIII. Air Liquide Post-Incident Actions 1. In the months following the August 28, 2016 incident, Airgas began a safety review of its nitrous oxide production facilities, trucking fleet, and cylinder-filling operations. The company has provided the CSB with periodic updates on the status of its safety initiative and has agreed to

330 See Guidelines for Risk Based Process Safety at Section 8.1.2 [105], Section 1. 331 Id., at Section 1. 332 Id., at Section 1. 333 See Essential Practices for Managing Chemical Reactivity Hazards at Chapter 2 [100].

CSB • Investigation Report • Airgas • Cantonment, Florida 122

complete the initiative and address the findings described in this report for its facilities in the United States and Canada. The scope of the initiative is shown in Table 1. Table 1. Air Liquide Post-Incident Actions Topic Current Status Safety Management System  Committed to applying a process safety management system for the nitrous oxide business;  Applying additional resources to existing facilities and rebuild of Cantonment; and  Will apply the hierarchy of controls throughout including hazard reviews, management of change, and corrective actions. Inherently Safer Design  Gathering requirements and resources to conduct design review;  Developing plan to train key personnel;  Receiving proposals from inherently safer design safety experts;  Plan includes development of an ongoing inherently safety design component to be used in future hazard reviews; and  Commitment to implement inherently safer design where feasible (practicable). Hazard Analysis  Complete for Yazoo City and Maitland;  Increasing the basis for a nitrous oxide decomposition explosion consequence to a severity-level in the criticality matrix 4;  Will apply the hierarchy of controls;  Developing safeguard design and availability philosophy; and  Planning to transition to HAZOP and LOPA.334

334 See HAZOP, Hazard and Operability Study and LOPA, Layer of Protection Analysis, [159].

CSB • Investigation Report • Airgas • Cantonment, Florida 123 Topic Current Status Apply Lessons from Previous Incidents  Developing plan to use a corporate communication process; and  Will finalize after company investigation of Cantonment incident is complete. Apply Industry Safety Standards  Completed gap analysis of CGA G-8.3–2016;  Implementing plan to close gaps at Yazoo City and Maitland;  Developing plan to evaluate ISA-84;  Will incorporate ISA-84 approach in new HAZOP reviews;  Plan developed to train key personnel on safety instrumented systems; and  Adding industry safety standards to an existing program that monitors regulatory updates and changes. Management of Change  Implemented an MOC program to nitrous oxide plants (complete). Contamination  Developing engineering standard to address material of construction;  Currently testing contamination effect on nitrous oxide decomposition;  Testing program includes lubricants, refrigerants, metals, and metal oxides;  Plan to incorporate testing results into process safety information; and  Commitment to share summary of results with the Compressed Gas Association. Process Safety Information (PSI)  Plan developed to apply PSM/RMP program for process safety information to nitrous oxide business.

CSB • Investigation Report • Airgas • Cantonment, Florida 124

Topic Current Status Technical Staffing  Assigned an interim subject matter expert to provide additional technical support;  Developing plans and assignments for additional technical subject matter experts;  Obtained approval for additional technical staff resource to focus on process safety; and  Developing an audit tool to ensure long-term commitment to sufficient technical staffing. Hourly Staffing  Short term increases in current staffing levels to two operators per shift and will conduct safety review to determine long-term staffing levels and scheduling of tasks in order to improve safe operations; and  Updating training program for operators and drivers. Audit Program  Applying Air Liquide audit program; and  Developing a plan to review audit design. Safety Interlock Testing  Developing a plan to conduct a safety review of interlock testing all interlock testing procedures; and  Developing a plan to require a safety review of interlock testing procedures for new or modified safety interlocks. Run-Dry Safety Interlock  Completed review of run-dry protection systems;  Conducting full engineering assessment to document technical specifications and finalize engineering solution;  Installing redundant systems with independent instrumentation on all nitrous oxide pumps; and  Improvements at other sites for the ground pumps that at similar to pumps at Cantonment (complete).

CSB • Investigation Report • Airgas • Cantonment, Florida 125 Topic Current Status Transfer Pumps  Conducting engineering review;  Developing a plan to ensure pump systems meet NPSH guidelines;  Maintaining additional level in some tanks as an interim safety measure;  Developing a plan to have a standard pump and pump design;  Evaluating additional instrumentation through hazard analysis and ISA-84 process; and  Developing a plan for comprehensive electrical grounding and bonding systems. Flame Arrestors  Conducted literature review;  Developed preliminary prototype designs;  Developing plan for a comprehensive testing program;  Planning to develop engineering standard, specifications, and written preventive maintenance plan;  Planning to add to critical equipment list;  Planning to develop specific audit tool for periodic evaluation; and  Commitment to share summary of testing results and engineering specification with the Compressed Gas Association. Operations  Reviewing pressure relief valve discharge locations;  Reviewing relief valve design;  Reviewing preventive and predictive maintenance;  Developing a plan for engineering modifications to reduce employee exposure to nitrous oxide. Electrical Grounding  Developing a program to ensure electrical continuity for tanks and trailers.

CSB • Investigation Report • Airgas • Cantonment, Florida 126

IX. Recommendations Reiterated Recommendations In September 2002, the CSB unanimously approved Improving Reactive Hazard Management, a report covering a special CSB investigation into hazards at U.S. sites that manufacture, store, or use potentially reactive chemicals, such as nitrous oxide. As a result of the study, CSB recommended that OSHA, amend its Process Safety Management (PSM) Standard, 29 CFR 1910.119, to achieve more comprehensive control of reactive hazards that could have catastrophic consequences. The CSB recommendation included language to broaden coverage of hazards from self-reactive chemicals to include chemicals such as nitrous oxide. The CSB also recommended that OSHA, implement a program to define and record information on reactive incidents that OSHA investigates or requires to be investigated under OSHA regulations. The CSB hereby reiterates these important safety recommendations and urges OSHA to reconsider its decision not to implement these recommendations. New Recommendations According to its statutory authority under 42 U.S.C. § 7412(r)(6)(C)(i) and (ii), and in the interest of promoting safer manufacturing operations at U.S. facilities handling chemicals, and to protect workers and communities from nitrous oxide explosion hazards, the CSB makes the following safety recommendations: A. Air Liquide 2016-04-I-FL-R1

  1. Complete Post-Incident Actions and Process Safety Initiatives

for Nitrous Oxide Operations The goal of 2016-04-I-FL-R1 is to prevent all nitrous oxide explosions at its facilities, while preventing harm to workers and the public. Following the August 28, 2016, incident, the company began a comprehensive initiative to review its nitrous oxide production facilities, trucking fleet, and cylinder-filling operations. The scope of the ongoing Air Liquide initiative is shown in Table 1. Complete the development and implementation of the company’s nitrous oxide business process safety initiative as shown in Table 1, consistent with the findings, conclusions, and recommendations contained in this report.

CSB • Investigation Report • Airgas • Cantonment, Florida 127 B. The Compressed Gas Association (CGA) 2016-04-I-FL-R2

  1. Safety Management System for Nitrous Oxide Manufacturing

Develop and implement a safety management system standard for nitrous oxide manufacturing, to manage known process safety hazards, including nitrous oxide decomposition, which includes appropriate elements based on chemical industry good practice guidance, such as CCPS Guidelines for Risk Based Process Safety, Essential Practices for Managing Chemical Reactivity Hazards, and Guidelines for Implementing Process Safety Management. 2016-04-I-FL-R3

  1. Ensure Effective Flame Arrestor Design

Modify Compressed Gas Association (CGA) standard CGA G-8.3, Safe Practices for Storage and Handling of Nitrous Oxide to require testing of safety devices, such as strainers used as flame arrestors, for applications where a safety device is used to quench a nitrous oxide decomposition reaction. To ensure that these safety devices meet the intended purpose, the user should test the safety device by simulating conditions of use. In addition, require users to document the required performance standard or test protocol followed. 2016-04-I-FL-R4

  1. Require Pump Run-Dry Safety Interlocks Apply ISA-84

Modify Compressed Gas Association (CGA) standard CGA G-8.3, Safe Practices for Storage and Handling of Nitrous Oxide to reference and require applying International Society of Automation (ISA) standard ISA-84, Functional Safety: Safety Instrumented Systems for the Process Industry Sector to safety interlocks such as the nitrous oxide pump “run-dry” shutdown. C. Pump Manufacturer – ACD LLC 2016-04-I-FL-R5

  1. Provide effective warning about nitrous oxide decomposition

hazards Modify nitrous oxide pump product literature to include warnings about nitrous oxide decomposition hazards, illustrated by examples from historical incidents, and refer users to this CSB investigation report for additional information.

CSB • Investigation Report • Airgas • Cantonment, Florida 128

D. Pump Manufacturer – Cryostar USA LLC 2016-04-I-FL-R6

  1. Provide effective warning about nitrous oxide decomposition

hazards Modify nitrous oxide pump product literature to include warnings about nitrous oxide decomposition hazards, illustrated by examples from historical incidents, and refer users to this CSB investigation report for additional information.

CSB • Investigation Report • Airgas • Cantonment, Florida 129 Members of the U.S. Chemical Safety and Hazard Investigation Board:

Vanessa Allen Sutherland, J.D./M.B.A. Chairperson

Manuel Ehrlich Member

Richard Engler Member

Kristen Kulinowski, Ph.D. Member

CSB • Investigation Report • Airgas • Cantonment, Florida 130

X. Causal Analysis Figure 61. Simplified causal analysis of the August 28, 2016 Airgas incident.

CSB • Investigation Report • Airgas • Cantonment, Florida 131 XI. References

[1] K. Munke, "Nitrous Oxide Trailer Rupture," 2 July 2001. [Online]. Available: http://hobbyspace.com/AAdmin/archive/SpecialTopics/Misc/eindhoven.pdf. [Accessed 21 January 2017]. [2] C. E. Baukal, Jr., Ed., The John Zink Hamworthy Combustion Handbook: Design and Operations, vol. 2, Boca Raton, Florida: CRC Press, 2013. [3] American Welding Society, Jefferson's Welding Encyclopedia, Eighteenth ed., R. L. O'Brien, Ed., Miami, Florida, 1997. [4] FTC, "ANALYSIS OF PROPOSED AGREEMENT CONTAINING CONSENT ORDERS TO AID PUBLIC COMMENT: In tthe Matter of American Air Liquide Holdings, Inc., File No. 161 0045," [Online]. Available: https://www.ftc.gov/system/files/documents/cases/160513americanairanalysis.pdf. [Accessed 21 January 2017]. [5] Matheson, "Matheson Tri-Gas Completes Acquisition of U.S. Assets Divested by Air Liquide," 8 September 2016. [Online]. Available: http://www2.mathesongas.com/NewsEvents/releases/article.aspx?articleID=214. [Accessed 21 January 2017]. [6] Matheson, "Matheson Corporate Website," [Online]. Available: http://www.mathesongas.com/. [Accessed 21 January 2017]. [7] FTC, "FTC Settlement Would Restore Competition in U.S. Market for Nitrous Oxide," 26 October 2001. [Online]. Available: https://www.ftc.gov/news-events/press-releases/2001/10/ftc-settlement-would-restore- competition-us-market-nitrous-oxide. [Accessed 21 January 2017]. [8] Weldship Corporation, "Texas Trailers Nitrous Oxide Tank Trailers," [Online]. Available: http://www.weldship.com/products/tank-trailers.html. [Accessed 21 January 2017]. [9] "y-Strainer Graphic," [Online]. Available: https://media.licdn.com/mpr/mpr/p/3/005/085/379/030cf46.jpg. [Accessed 21 January 2017]. [10] Liquid Controls Sponsler, Inc., "Precision Turbine Flowmeters," 2009. [Online]. Available: http://www.sponsler.com/pdfs/LT-5007.pdf. [Accessed 21 January 2017]. [11] Sponsler, "Installation & Operation Manual: Model T675 Delivery System Totalizer," September 2009. [Online]. Available: http://www.sponsler.com/manuals/mn-t675.pdf. [Accessed 21 January 2017]. [12] Smith Precision Pumps, "Smith Pumps," [Online]. Available: http://www.smithpumps.com/. [Accessed 21 January 2017]. [13] Cryostar, "Cryostar," [Online]. Available: http://www.cryostar.com/. [Accessed 21 January 2017]. [14] MSDS Online, "MSDS Glossary of Terms: Self-Reactive Substance," [Online]. Available: https://www.msdsonline.com/resources/msds-resources/glossary-of-terms/self-reactive-substance.aspx. [Accessed 21 January 2017].

CSB • Investigation Report • Airgas • Cantonment, Florida 132

[15] Scaled Composites, LLC, "Scaled Composites Safety Guidelines for N2O," 17 June 2009. [Online]. Available: http://www.scaled.com/images/uploads/news/N2OSafetyGuidelines.pdf. [Accessed 21 January 2017]. [16] Merriam-Webster, "Definition of: adiabatic," [Online]. Available: https://www.merriam- webster.com/dictionary/adiabatic. [Accessed 21 January 2017]. [17] C. Merrill, "Nitrous Oxide Explosive Hazards," May 2008. [Online]. [Accessed 21 January 2017]. [18] G. D. Lewis, "Explosion and Fire in N2O Tank," West Palm Beach, 1973. [19] M. L. Tupman, "Storage and Use of Nitrous Oxide: The Nitrous Oxide Decomposition Reaction," 1994. [20] J. F. Mattrey, "Report of Nitrous Oxide Trailer Explosion at Puritan-Bennett's Manufacturing Plant," Richmond, 1981. [21] Associated Press, "One Dead in Explosion at Industrial Gases Plant," 11 May 1987. [Online]. Available: http://www.apnewsarchive.com/1987/One-Dead-In-Explosion-At-Industrial-Gases-Plant/id- 80e1f13cab0f04bef2af89151e07d95e. [22] Observer - Reporter, "Explosion in Reading Industrial Gases Plant Kills one Person and Injures Three Others," 11 May 1987. [Online]. Available: https://news.google.com/newspapers?nid=2519&dat=19870511&id=329eAAAAIBAJ&sjid=nWENAAAA IBAJ&pg=5805,1819683. [23] The Morning Call, "Air Products Sued Over Blast That Killed Man in Reading," 10 August 1988. [Online]. Available: http://articles.mcall.com/1988-08-10/news/2652364_1_nitrous-oxide-air-products-ugi. [24] R. van Wees, "Investigation of an Explosion of a Nitrous Oxide Tank Truck at Hoek Loos Medical in Eindhoven on 2 July 2001. Summary," TNO Defence, Security and Safety, Rijswijk, 2005. [25] T. Malik, "Report Cites Rocketship Builder in Explosion Inquiry," 18 January 2008. [Online]. Available: http://www.space.com/4863-report-cites-rocketship-builder-explosion-inquiry.html. [26] Titan, "Screen and Basket Selection Guide: Choosing the Right Straining Element," [Online]. Available: http://www.titanfci.com/docs/technical-data/sst.pdf. [Accessed 21 January 2017]. [27] A. N. Minyard, M.D., "Records Request Response: MLA16-671," Florida, 2016. [28] Enardo, "Flame Arrestor Technology," 22 January 2017. [Online]. Available: http://www.enardo.com/pdfs/tech_paper_fat.pdf. [29] International Organization for Standardization, "Flame arresters — Performance requirements, test methods and limits for use," 22 January 2017. [Online]. Available: https://www.iso.org/obp/ui/#iso:std:iso:16852:ed- 2:v1:en. [30] Institution of Chemical Engineers (IChemE), "About IChemE," [Online]. Available: http://www.icheme.org/about_us.aspx. [Accessed 20 January 2017]. [31] Smith Precision Pumps, "Smith Pumps Utilized in Low-Pressure Liquid Nitrous Oxide Bulk Transfer Service," [Online]. Available: http://www.smithpumps.com/literature/downloads/?file=AL-45.pdf. [Accessed 22 January 2017].

CSB • Investigation Report • Airgas • Cantonment, Florida 133 [32] Major Accident Reporting System (eMARS), "Accident Profile," 2 July 2001. [Online]. Available: https://emars.jrc.ec.europa.eu/fileadmin/eMARS_Site/PhpPages/ViewAccident/ViewAccidentPublic.php?a ccident_code=629. [33] M. Davies and T. Heidermann, "Protect Your Process with the Proper Flame Arresters," Chemical Engineering Progress (CEP), pp. 16-22, December 2013. [34] A. E. Summers, "sis-tech.com," [Online]. Available: http://sis-tech.com/wp-content/uploads/2013/09/PSP- published-SCAI.pdf. [Accessed 22 January 2017]. [35] W. Johnson, R. R. Dunn and V. J. Maggioli, "Understanding ISA-84: Important Functional Safety Standard for Automation in the Computer Age," May/June 2012. [Online]. Available: https://www.isa.org/standards- and-publications/isa-publications/intech-magazine/2012/june/cover-story-understanding-isa-84/. [Accessed 22 January 2017]. [36] International Society of Automation, "ISA84, Electrical/Electronic/Programmable Electronic Systems (E/E/PES) for Use in Process Safety Applications," [Online]. Available: https://www.isa.org/isa84/. [Accessed 22 January 2017]. [37] International Society of Automation (ISA), "Functional Safety: Safety Instrumented Systems for the Process Industry Sector - Part 1: Framework, Definitions, System, Hardware and Software Requirements," ISA, 2004. [38] J. L. Bergstrom, "An Overview of ISA 84 Standard for Safety Instrumented Systems (SIS) and the Safety Life Cycle," July 2015. [Online]. Available: http://www.processengr.com/ppt_presentations/safety_lifecycle_training_2015.pdf. [Accessed 22 January 2017]. [39] Smith Precision Pumps, "Do's and Don'ts: Read This Bulletin Before Installing and Operating a Smith Pump," [Online]. Available: http://www.smithpumps.com/literature/downloads/?file=AL-17A.pdf. [Accessed 22 January 2017]. [40] Mueller Steam Specialty, "Theoretical Pressure Drop Curve for Screen Clogging," 2010. [Online]. Available: http://media.wattswater.com/S-MS-PressureDropClog.pdf. [Accessed 22 January 2017]. [41] EagleBurgmann, "Mechanical Seal Technology and Selection," [Online]. Available: https://www.eagleburgmann.com/media/literature-competences-products-solutions/division-mechanical- seals/competences/brochure-mechanical-seal-technology-and-selection. [Accessed 22 January 2017]. [42] Michael Smith Engineers LTD, "Suction Pipeline Design," [Online]. Available: http://www.michael-smith- engineers.co.uk/resources/useful-info/suction-pipeline-design. [Accessed 22 January 2017]. [43] Oil and Gas Processing, "NPSHa Calculations," [Online]. Available: http://www.oilgasprocessing.com/npsh1.htm. [Accessed 22 January 2017]. [44] Shipco Pumps, "Are Suction Strainers Necessary on Centrifugal Pumps?," [Online]. Available: http://www.shipcopumps.com/articles/index.php?category=technical-articles&id=are-suction-strainers- necessary-on-centrifugal-pumps. [Accessed 22 January 2017].

CSB • Investigation Report • Airgas • Cantonment, Florida 134

[45] Goulds Pumps, "Goulds Model 3196: Spirit of Continuous Improvement, Excellence Mark the History of the World's Most Popular Process Pump," 6 February 2008. [Online]. Available: Goulds Model 3196: Spirit of Continuous Improvement, Excellence Mark the History of the World's Most Popular Process Pump. [Accessed 22 January 2017]. [46] ITT, "Product Stewardship and Supply Chain," [Online]. Available: http://www.itt.com/Citizenship/products/. [Accessed 22 January 2017]. [47] Fortune Valve, "Stainless Steel Ball Valve No: Series 336," [Online]. Available: http://fortunefusionvalve.en.ec21.com/. [Accessed 22 January 2017]. [48] Conbraco, "Apollo Ball Valve," [Online]. Available: http://cdn.conbraco.com/apollovalves/products/86r- 100_2in/HRP_86R-108-01.JPG. [Accessed 22 January 2017]. [49] American Institute of Chemical Engineers (AIChE), "CCPS By-Laws-Amended November 5, 2007," [Online]. Available: http://www.aiche.org/ccps/about/by-laws#Article%20I%20section%202. [Accessed 22 January 2017]. [50] Center for Chemical Process Safety (CCPS), "Member Companies," [Online]. Available: http://www.aiche.org/ccps/community/members. [Accessed 22 January 2017]. [51] T. Kletz and P. Amyotte, Process Plants: A Handbook for Inherently Safer Design, Second ed., Boca Raton, Florida: CRC Press, 2010. [52] National Fire Protection Association, NFPA 69: Standard on Explosion Prevention Systems, 2014 ed., Quincy, Massachusetts, 2014. [53] National Fire Protection Association, NFPA 68: Standard on Explosion Protection by Deflagration Venting, 2013 ed., Quincy, Massachusetts, 2013. [54] M. Stahl, B. Poblete, B. Tulsyan and A. Staszak, "Why Do We Still Have Blast Walls on Offshore Platforms?," in 11th Global Congress on Process Safety, 2015. [55] Asia Industrial Gases Association, "Installation Guide for Stationary Electric-Motor Driven Centrifugal Liquid Oxygen Pumps," Singapore, 2014. [56] Techno Kontrol, "TK-AXBSS Anti-Explosion / Blast Safety Systems," [Online]. Available: http://www.technokontrol.com/en/products/blast.php. [Accessed 22 January 2017]. [57] USCSB, "U.S. Chemical Safety Board Votes 5-0 to Recommend New OSHA, EPA, and Industry Standards to Control Chemical Reaction Hazards," 20 September 2002. [Online]. Available: http://www.csb.gov/u-s- chemical-safety-board-votes-5-0-to-recommend-new-osha-epa-and-industry-standards-to-control-chemical- reaction-hazards/. [Accessed 22 January 2017]. [58] Airgas, "Safety Data Sheet: Nitrous Oxide," 11 February 2016. [Online]. Available: https://www.airgas.com/msds/001042.pdf. [Accessed 22 January 2017]. [59] National Fire Protection Association, Hazardous Chemicals Data 1975, Boston, 1975, p. 314. [60] U.S. Pharmacopeial Convention, "About USP," [Online]. Available: http://www.usp.org/about-usp. [Accessed 22 January 2017].

CSB • Investigation Report • Airgas • Cantonment, Florida 135 [61] Chemours, "Teflon: Safety of Teflon: Nonstick Coating Systems," [Online]. Available: https://www.chemours.com/Teflon/en_US/products/safety/what_is_it.html. [Accessed 22 January 2017]. [62] A. Hopkins, Lessons from Longford: The Esso Gas Plant Explosion, Sydney, NSW: CCH Australia, 2000. [63] Center for Chemical Process Safety, "The Business Case for Process Safety: 2nd Edition," 2006. [Online]. Available: http://www.aiche.org/sites/default/files/docs/pages/ccpsbuscase2nded-120604133414- phpapp02.pdf. [Accessed 22 January 2017]. [64] USNTSB, "Pacific Gas and Electric Company: Natural Gas Transmission Pipeline Rupture and Fire: San Bruno, California: September 9, 2010," United States National Transportation Safety Board, 2011. [65] USNTSB, "NTSB: American Petroleum Institute’s New Recommended Practice for Pipeline Safety Management Systems Exceeds NTSB Recommendation," 30 October 2015. [Online]. Available: https://www.ntsb.gov/news/press-releases/Pages/PR20151030a.aspx. [Accessed 22 January 2017]. [66] USNTSB, "Keynote speech at the American Gas Association’s (AGA) Executive Leadership Summit," 16 November 2015. [Online]. Available: https://www.ntsb.gov/news/speeches/CHart/Pages/hart20151116.aspx. [Accessed 22 January 2017]. [67] B. Kichler, "API RP 1173: Pipeline Safety Management Systems," [Online]. Available: http://www.occeweb.com/TR/PLSLatestSeminar/2016/Safety%20Management%20System%20RP- 1173.pdf. [Accessed 22 January 2017]. [68] ACD, "ACD," 2017. [Online]. Available: http://www.acdllc.com/. [Accessed 21 January 2017]. [69] Air Products, "Safety Gram #20: Nitrous Oxide N2O," [Online]. Available: http://www.apsusa.biz/grams/safetygram20.pdf. [70] Linde, "Safety Data Sheet: Nitrous Oxide," [Online]. Available: http://www.linde- gas.com/internet.global.lindegas.global/en/images/Compressed%20nitrous%20oxide17_24366.pdf?v=1.0. [71] B. Berger, "Is Nitrous Oxide Safe?," 5 October 2007. [Online]. Available: http://www.spl.ch/publication/SPL_Papers/N2O_safety_e.pdf. [72] Z. W. Rogowski, "Flame Arresters in Industry," [Online]. Available: https://www.icheme.org/communities/subject_groups/safety%20and%20loss%20prevention/resources/haza rds%20archive/~/media/Documents/Subject%20Groups/Safety_Loss_Prevention/Hazards%20Archive/VII/ VII-Paper-05.pdf. [73] American Petroleum Institute (API), "Flame Arresters in Piping Systems: API Recommended Practice 2028: Third Edition: February 2010," 2010. [74] European Industrial Gases Association (EIGA), "Safe Practices for Storage and Handling of Nitrous Oxide," Brussels, 2016. [75] European Industrial Gases Association (EIGA), "Major Hazards," Brussels, 2008. [76] European Industrial Gases Association (EIGA), "Code of Practice Nitrous Oxide," Brussels, 2004. [77] Air Liquide, "Air Liquide announces divestiture of U.S. assets to Matheson Tri-Gas in connection with Airgas acquisition," 24 June 2016. [Online]. Available: https://www.airliquide.com/media/air-liquide- announces-divestiture-us-assets-matheson-tri-gas-connection-airgas-acquisition.

CSB • Investigation Report • Airgas • Cantonment, Florida 136

[78] J. K. Cawthra and M. Eisentadt, "Summary of Nitrous Oxide Investigations: Final Report," Kirtland Air Force Base, July 1976. [79] H. Phillips and D. K. Pritchard, "I. CHEM. E. Symposium Series No. 97: Performance Requirements of Flame Arresters in Practical Applications," 1986. [Online]. Available: https://www.icheme.org/~/media/Documents/Subject%20Groups/Safety_Loss_Prevention/Hazards%20Arc hive/IX/IX-Paper-05.pdf. [Accessed 20 January 2017]. [80] Lawrence Pumps Inc USA (Reprinted with permission by Kelair Pumps), "Pump Clinic ... Issue 31: Inducers for Centrifugal Pumps," [Online]. Available: http://www.wycopump.com/pdfs/pumpclinic31.pdf. [81] T. Sahoo, "Use of Inducers in Liquefied Petroleum Gas and Condensate Service for Better Performance," in PROCEEDINGS OF THE TWENTY-SECOND INTERNATIONAL PUMP USERS SYMPOSIUM • 2005, West Bengal, India, 2005. [82] "Inducer," [Online]. Available: http://www.mcnallyinstitute.com/CDweb/i-html/i011.htm. [83] A. Karabeyoglu, "JPC 2012 Presentation: N2O [Nitrous Oxide] Safety," 31 July 2012. [Online]. Available: http://spase.stanford.edu/Hybrid_Rocket_Student_Meeting_files/Arif%20Karabeyoglu%20Presentation.pdf . [Accessed 25 September 2016]. [84] S. Beitler, "Delaware City, DE Industrial Plant Explosion, Aug 1977: Industrial Blast Kills 4 Workers," [Online]. Available: http://www.gendisasters.com/delaware/18038/delaware-city-de-industrial-plant- explosion-aug-1977. [Accessed 23 January 2017]. [85] New Jersey Department of Health and Senior Services, "Hazardous Substance Fact Sheet: Nitrous Oxide,"

  1. [Online]. Available: http://nj.gov/health/eoh/rtkweb/documents/fs/1399.pdf. [Accessed 23 January

2017]. [86] T. Argo and E. Sandstrom, "Separation Distances in NFPA Codes and Standards: Final Report," 2014. [Online]. Available: http://www.nfpa.org/Assets/files/AboutTheCodes/59A/RFSeparationDistancesNFPACodesAndStandards.p df. [Accessed 23 January 2017]. [87] A. Chang, "Spaceship Builder Faulted in Explosion," 7 February 2008. [Online]. Available: http://usatoday30.usatoday.com/tech/products/2008-02-07-2205394662_x.htm. [Accessed 23 January 2017]. [88] Airgas, "Airgas Sustainability Report 2015: Responsibility: Emission and Waste Reduction," 2015. [Online]. Available: https://www.airgas.com/sustainability/emission_and_waste_reduction.html. [Accessed 1 September 2016]. [89] Special Metals, "Monel alloy 400," 5 February 2005. [Online]. Available: http://www.specialmetals.com/assets/documents/alloys/monel/monel-alloy-400.pdf. [Accessed 23 January 2017]. [90] Special Metals, "High Performance Alloys," 2015. [Online]. Available: http://www.specialmetals.com/alloys. [Accessed 23 January 2017]. [91] "Nitrous Oxide Map," 24 January 2017. [Online]. Available: https://www.mapcustomizer.com/map/Nitrous%20Oxide%20Map.

CSB • Investigation Report • Airgas • Cantonment, Florida 137 [92] Linde, "Safety Advice. Disolved Acetylene.," 2016. [Online]. Available: http://www.lindeus.com/internet.lg.lg.usa/en/images/2987_0416_07_acetylene_v1138_276011.pdf?v=1.0. [Accessed 24 January 2017]. [93] Air Products, "Acetylene," 2014. [Online]. Available: http://www.airproducts.com/~/media/files/pdf/company/safetygram-13.pdf. [Accessed 24 January 2017]. [94] Protego, "Special Solutions," [Online]. Available: http://www.protego.com/products/special-solutions.html. [Accessed 24 January 2017]. [95] The University of Washington: Department of Chemistry, Combustion of Steel Wool: Steel wool burns slowly in atmospheric conditions. When placed into a oxygen rich environment it burns much faster., UWChemistry, 2012. [96] Product Stewardship Society, "Core Competencies for the Product Stewardship Professional," [Online]. Available: http://www.productstewards.org/Resources/Documents/PS-Core-Competencies.pdf. [Accessed 22 January 2017]. [97] J. O. Krisjansons, L. E. Bollinger and R. Edse, "Explosion Limit Studies of Nitrous Oxide and Nitrous Oxide - Nitrogen - Air Mixtures to 200 Atm. and 1800R," September 1962. [Online]. Available: http://www.dtic.mil/dtic/tr/fulltext/u2/291701.pdf. [98] D. E. Becker and M. Rosenberg, "Nitrous Oxide and the Inhalation Anesthetics," Anesthesia Progress: A Journal for Pain and Anxiety Control in Dentistry, pp. 124-131, Winter 2008. [99] Dictionary of Engineering, "Propagation Speed," [Online]. Available: http://www.dictionaryofengineering.com/definition/propagation-speed.html. [Accessed 25 January 2017]. [100] R. W. Johnson, S. W. Rudy and S. D. Unwin, Essential Practices for Managing Chemical Reactivity Hazards, New York, New York: Center for Chemical Proces Safety of the American Institute of Chemical Engineers, 2003. [101] S. S. Grossel, Deflagration and Detonation Flame Arresters, New York, New York: Center for Chemical Process Safety, 2002. [102] Center for Chemical Process Safety, Guidelines for Engineering Design for Process Safety,, Second ed., New York, New York: American Institute of Chemical Engineers, 2012. [103] Center for Chemical Process Safety, Guidelines for Implementing Process Safety Management, Second ed., Hoboken, New Jersey: American Institute of Chemical Engineers, 2016. [104] Center for Chemical Process Safety, Guidelines for Investigating Chemical Process Incidents, Second ed., New York, New York: American Institute of Chemical Engineers, 2003. [105] Center for Chemical Process Safety, Guidelines for Risk Based Process Safety, Hoboken, New Jersey: John Wiley & Sons, Inc., 2007. [106] Center for Chemical Process Safety, Inherently Safer Chemical Processes: A Life Cycle Approach, Second ed., New York, New York: John Wiley & Sons, Inc., 2009. [107] D. A. Crowl, Understanding Explosions, New York, New York: Center for Chemical Process Safety of the American Institute of Chemical Engineers, 2003.

CSB • Investigation Report • Airgas • Cantonment, Florida 138

[108] R. K. Eckhoff, Explosion Hazards in the Process Industries, Second ed., Cambridge, Massachusetts: Elsevier, 2016. [109] European Industrial Gases Association (EIGA), "Cleaning of Equipment for Oxygen Service: Guideline: IGC Doc 33/06/E," 2006. [Online]. Available: https://www.google.com/search?site=&source=hp&q=cleaning+equipment+for+oxygen+service&oq=clean ing+equipment+for+&gs_l=hp.1.0.0l10.1062.6146.0.8420.26.22.1.0.0.0.329.3226.1j9j7j1.18.0....0...1.1.64. hp..7.18.3071.0..35i39k1j0i131k1j0i20k1j0i67k1.h916SRkps4o. [Accessed 26 January 2017]. [110] USNTSB, "Enbridge Incorporated: Hazardous Liquid Pipeline Rupture and Release: Marshall, Michigan: July 25, 2010," United States National Transportation Safety Board, 2012. [111] Air Liquide, "Air Liquide in brief," 2017. [Online]. Available: https://www.airliquide.com/media/air- liquide-brief. [Accessed 27 January 2017]. [112] Airgas, "Airgas an Air Liquide Company: Nitrous Oxide," [Online]. Available: http://airgasspecialtyproducts.com/nitrousoxide/. [Accessed 27 January 2017]. [113] Airgas, "Thermodynamic Properties of Saturated Nitrous Oxide," 2016. [Online]. Available: http://airgasspecialtyproducts.com/wp-content/uploads/2016/02/Properties-Nitrous-Oxide.pdf. [Accessed 22 January 2017]. [114] Fluid Sealing Association, "How do Plant Pipe Strain Problems Affecty my Pumping Systems?," March

  1. [Online]. Available: http://www.pumpsandsystems.com/topics/seals/how-do-plant-pipe-strain-

problems-affect-my-pumping-systems. [Accessed 28 January 2017]. [115] Space Propulsion Group, Inc., "Nitrous Oxide Safety," 2012. [Online]. Available: http://www.spg- corp.com/nitrous-oxide-safety.html. [Accessed 28 January 2017]. [116] G. W. Rhodes, "Investigation of Decomposition Characteristics of Gaseous and Liquid Nitrous Oxide," Air Force Weapons Laboratory: Kirtland Air Force Base, New Mexico, July 1974. [Online]. Available: https://www.freelists.org/archives/arocket/01-2014/pdfEE82jaPU9W.pdf. [Accessed 28 January 2017]. [117] State of California: Division of Occupational Safety and Health, "Inspection Report: 0950625, Inspection Nr.: 310821103," 2008. [118] Scaled Composites, LLC, "News Release," 1 August 2008. [Online]. Available: http://www.scaled.com/images/uploads/news/airelease_8_1_08.pdf. [Accessed 28 January 2017]. [119] D. Messier, "What Scaled, Virgin & Peter Diamandis Said After Last Fatal SpaceShipTwo Program Accident," 4 December 2014. [Online]. Available: http://www.parabolicarc.com/2014/12/04/peter- diamandis-virgin-galactic-fatal-spaceshiptwo-accident/. [Accessed 28 January 2017]. [120] Parker Hannifin Corporation, "Parker O-Ring Handbook: ORD 5700," 2007. [Online]. Available: http://www.parker.com/literature/O-Ring%20Division%20Literature/ORD%205700.pdf. [Accessed 28 January 2017]. [121] Pensacola News Journal, "Jesse Graham Folmar 1984 - 2016," 2016. [Online]. Available: http://www.legacy.com/obituaries/pensacolanewsjournal/obituary.aspx?n=jesse-graham- folmar&pid=181233037&fhid=5666. [Accessed 29 January 2017].

CSB • Investigation Report • Airgas • Cantonment, Florida 139 [122] Center for Chemical Process Safety, "20 Elements of Risk Based Process Safety (RBPS)," [Online]. Available: http://www.aiche.org/academy/courses/ela120/20-elements-risk-based-process-safety-rbps. [Accessed 29 January 2017]. [123] Levante-emv, "One Killed in an Explosion at a Moncada Factory," 7 September 2012. [Online]. Available: http://www.levante-emv.com/sucesos/2012/09/07/muerto-explosion-fabrica-moncada/934209.html. [Accessed 21 January 2017]. [124] USDOL, "1910.105: Nitrous Oxide," [Online]. Available: https://www.osha.gov/pls/oshaweb/owadisp.show_document?p_table=STANDARDS&p_id=9751. [125] USDOL, "1910.119 App A: List of Highly Hazardous Chemicals, Toxics and Reactives (Mandatory)," [Online]. Available: https://www.osha.gov/pls/oshaweb/owadisp.show_document?p_table=STANDARDS&p_id=9761. [126] USDOL, "Accident Search Results: Nitrous Oxide," [Online]. Available: https://www.osha.gov/pls/imis/AccidentSearch.search?acc_keyword=%22Nitrous%20Oxide%22&keyword _list=on. [Accessed 22 January 2017]. [127] USFDA (and others), "Guideline on General Principles of Process Validation," May 1987. [Online]. Available: http://www.pharmanet.com.br/pharmanet/pv.htm. [Accessed 22 January 2017]. [128] USDOL, "Inspection 100395516 - John H. Corbit, Inc.," 13 January 1988. [Online]. Available: https://www.osha.gov/pls/imis/establishment.inspection_detail?id=100395516. [Accessed 21 January 2017]. [129] USEPA, "List of Regulated Substances Under the Risk Management Plan (RMP) Rule," [Online]. Available: https://www.epa.gov/rmp/list-regulated-substances-under-risk-management-plan-rmp-program. [130] USDOL, "Nitrous Oxide in Workplace Atmospheres (Passive Monitor)," May 1994. [Online]. Available: https://www.osha.gov/dts/sltc/methods/inorganic/id166/id166.html. [Accessed 22 January 2017]. [131] USDOL, "Process Safety Management Guidelines for Compliance: OSHA 3133," 1994 (Reprinted). [Online]. Available: https://www.osha.gov/Publications/osha3133.pdf. [Accessed 22 January 2017]. [132] USDOL, "Process Safety Management: OSHA 3132," 2000 (Reprinted). [Online]. Available: https://www.osha.gov/Publications/osha3132.pdf. [Accessed 22 January 2017]. [133] USDOL, "Standard Interpretations," 23 March 2000. [Online]. Available: https://www.osha.gov/pls/oshaweb/owadisp.show_document?p_table=INTERPRETATIONS&p_id=23722 . [Accessed 22 January 2017]. [134] USDOL, "Standard Interpretations," 29 November 2005. [Online]. Available: https://www.osha.gov/pls/oshaweb/owadisp.show_document?p_table=INTERPRETATIONS&p_id=25164 . [Accessed 22 January 2017]. [135] USDOL, "Updating OSHA Standards Based on National Consensus Standards," 24 November 2004. [Online]. Available: https://www.osha.gov/pls/oshaweb/owadisp.show_document?p_table=FEDERAL_REGISTER&p_id=1826

  1. [Accessed 22 January 2017].

[136] USCSB, "What do the Status Designations for Each Recommendation Mean?," [Online]. Available: http://www.csb.gov/recommendations/faq/#52.

CSB • Investigation Report • Airgas • Cantonment, Florida 140

[137] USCSB, "Board Member Poje Testifies in New Jersey on Reactive Hazards," 17 March 2003. [Online]. Available: http://www.csb.gov/board-member-poje-testifies-in-new-jersey-on-reactive-hazards/. [Accessed 29 January 2017]. [138] Center for Chemical Process Safety, "CCPS By-Laws-Amended November 5, 2007," 5 November 2007. [Online]. Available: http://www.aiche.org/ccps/about/by-laws#Article%20III%20Section%201. [Accessed 29 January 2017]. [139] A. E. Summers, "ISA 84 – The Standard for Safety Instrumented Systems," [Online]. Available: http://sis- tech.com/wp-content/uploads/2011/05/ISA84-_The_Standard_for_Safety_Instrumented_Systems.pdf. [Accessed 22 January 2017]. [140] Michigan Technological University, "Department of Chemical Engineering: Daniel A. Crowl," [Online]. Available: http://www.mtu.edu/chemical/department/faculty/crowl/. [Accessed 21 January 2017]. [141] laprovincia, "One Dead and Five Injured by gas Explosion," 8 September 2012. [Online]. Available: http://www.laprovincia.es/sucesos/2012/09/08/muerto-cinco-heridos-explosion-gas/481842.html. [Accessed 21 January 2017]. [142] Business Wire, "Airgas Helps Fuel SpaceShipOne's Ansari X Prize Victory; Offers Congratulations to Customer Scaled Composites," 5 October 2004. [Online]. Available: http://www.businesswire.com/news/home/20041005006014/en/Airgas-Helps-Fuel-SpaceShipOnes-Ansari- Prize-Victory. [143] Knights Arrow, "Observations and Comments on Cal/OSHA Report (Inspection No. 31081103) on Fatal Accident at Mojave Test Site of Scaled Composites at the Mojave Air and Space Port, 26th July 2007," [Online]. Available: http://www.knightsarrow.com/rockets/scaled-composites-accident/. [144] NBC News, "Spaceship Builder Faces Fines for Fatal Blast," 18 January 2008. [Online]. Available: http://www.nbcnews.com/id/22733186/ns/technology_and_science-space/t/spaceship-builder-faces-fines- fatal-blast/#.WI7WFfKJXeR. [Accessed 29 January 2017]. [145] State of Delaware, "Department of State: Division of Corporations," [Online]. Available: https://icis.corp.delaware.gov/Ecorp/EntitySearch/NameSearch.aspx. [Accessed 29 January 2017]. [146] Compressed Gas Association (CGA), "Standard for the Installation of Nitrous Oxide Systems at Customer Sites," 1964. [147] Compressed Gas Association (CGA), "Cleaning Equipment for Oxygen Service," 2009. [148] Compressed Gas Association (CGA), "Safety and Reliability of Industrial Gases, Equipment, and Facilities Seminar," 16-17 October 2013. [Online]. Available: https://web.archive.org/web/20131414034200/http:/www.cganet.com/events/2013safetyandreliability/2013 PreliminaryProgram.php. [Accessed 29 January 2017]. [149] A. Hopkins, "Lessons from Esso's Gas Plant Explosion at Longford," [Online]. Available: http://www.futuremedia.com.au/docs/Lessons%20from%20Longford%20by%20Hopkins.PDF. [Accessed 29 January 2017]. [150] Compressed Gas Association (CGA), CGA G-8.3–2016: Safe Practices for Storage and Handling of Nitrous Oxide, Second ed., 2016.

CSB • Investigation Report • Airgas • Cantonment, Florida 141 [151] Compressed Gas Association (CGA), "CGA G-4.1–2009: Cleaning Equipment for Oxygen Service," 2009. [152] Compressed Gas Association (CGA), "Publications," [Online]. Available: https://www.cganet.com/customer/Publication.aspx. [Accessed 30 January 2017]. [153] G. Floreancig, "Total Enclosed Fan Cooled vs Open Drip Proof (TEFC vs ODP)," 27 June 2011. [Online]. Available: https://www.youtube.com/watch?v=8raG1ZxunA8. [Accessed 30 January 2017]. [154] Faircloth & Roberts Metallurgical Services, LLC, "L160812-RPT-102," Mobile, 2016. [155] Compressed Gas Association (CGA), "CGA G-8.1–2013: Standard for Nitrous Oxide Systems at Customer Sites," 2013. [156] Compressed Gas Association (CGA), "CGA G-8.4–2016: Safe Practices for the Production of Nitrous Oxide from Ammonium Nitrate," 2016. [157] Compressed Gas Association (CGA), "Safety Bulletin: Nitrous Oxide Security and Control," Chantilly, May 2014. [158] Compressed Gas Association (CGA), "CGA P-2–2013: Characteristics and Safe Handling of Medical Gases," Chantilly. [159] Center for Chemical Process Safety, "CCPS Process Safety Glossary," [Online]. Available: http://www.aiche.org/ccps/resources/glossary. [Accessed 1 February 2017]. [160] TNO, "About TNO," [Online]. Available: https://www.tno.nl/en/about-tno/. [Accessed 2 February 2017]. [161] D. Burgener, "Liquid Nitrous Oxide Pump Related Incidents & Best Practices for Prevention," in Safety and Reliability of Industrial Gases, Equipment, and Facilities Seminar: Octoberr 16-17, 2013, Tampa, Florida, 2013. [162] Smith Precision Pumps, "AL-105: Field Adjustmentt of "WW-Series" Bypass Valves," [Online]. Available: http://www.smithpumps.com/literature/downloads/?file=AL-105.pdf. [Accessed 1 February 2017]. [163] Serta, "What's the Difference Between PSI, PSIA, & PSIG," 12 March 2015. [Online]. Available: http://www.setra.com/blog/the-difference-between-psi-psia-psig/2015/03/12. [Accessed 29 January 2017]. [164] American Gas Association (AGA), "AGA Website," [Online]. Available: https://www.aga.org/. [Accessed 29 January 2017]. [165] American Conference of Governmental Industrial Hygienists (ACGIH), "About ACGIH," 2017. [Online]. Available: http://www.acgih.org/about-us/about-acgih. [Accessed 29 January 2017]. [166] Asia Industrial Gases Association (AIGA), "AIGA Web Site," 2017. [Online]. Available: http://www.asiaiga.org/. [Accessed 29 January 2017]. [167] American Petroleum Institute (API), "About API," 2017. [Online]. Available: http://www.api.org/about. [Accessed 29 January 2017]. [168] American Petroleum Institute (API), "Procedures for Standards Development," June 2016. [Online]. Available: http://mycommittees.api.org/standards/Reference/API%20Procedures%20for%20Standards%20Developme nt-2016.pdf. [Accessed 29 January 2017].

CSB • Investigation Report • Airgas • Cantonment, Florida 142

[169] State of California: Department of Industrial Relations, "Cal/OSHA," 2017. [Online]. Available: http://www.dir.ca.gov/dosh/. [Accessed 29 January 2017]. [170] Center for Chemical Process Safety (CCPS), "CCPS," [Online]. Available: https://www.aiche.org/ccps. [Accessed 29 January 2017]. [171] TimeandDate.com, "CDT - Central Daylight Time / Central Daylight Saving Time (Daylight Saving Time)," 2017. [Online]. Available: https://www.timeanddate.com/time/zones/cdt. [Accessed 29 January 2017]. [172] USGPO, "Electronic Code of Federal Regulations," 1 February 2017. [Online]. Available: http://www.ecfr.gov/cgi-bin/ECFR?page=browse. [Accessed 2 February 2017]. [173] Compressed Gas Association (CGA), "CGA Web Site," [Online]. Available: https://www.cganet.com/. [Accessed 2 February 2017]. [174] USCSB, "U.S. Chemical Safety Board Web Site," [Online]. Available: http://www.csb.gov/. [Accessed 2 February 2017]. [175] USDOT, "U.S. Department of Transportation Web Site," [Online]. Available: https://www.transportation.gov/. [Accessed 2 February 2017]. [176] European Industrial Gases Association (EIGA), "EIGA Web Site," [Online]. Available: https://www.eiga.eu/index.php?id=291. [Accessed 2 February 2017]. [177] USEPA, "U.S. Environmental Protection Agency Web Site," 1 February 2017. [Online]. Available: https://www.epa.gov/. [Accessed 2 February 2017]. [178] USFDA, "U.S. Food & Drug Web Site," 30 January 2017. [Online]. Available: http://www.fda.gov/. [Accessed 2 February 2017]. [179] State of Florida, "The Official Portal of The State of Florida," 2 February 2017. [Online]. Available: http://www.myflorida.com/. [Accessed 2 February 2017]. [180] FTC, "Federal Trade Commission," [Online]. Available: https://www.ftc.gov/. [Accessed 2 February 2017]. [181] International Society of Automation (ISA), "ISA Web Site," [Online]. Available: https://www.isa.org/. [Accessed 2 February 2017]. [182] International Organization for Standardization (ISO), "ISO Web Site," [Online]. Available: http://www.iso.org/iso/home.html. [Accessed 2 February 2017]. [183] Japan Industrial and Medical Gases Association (JIMGA), "JIMGA Web Site," [Online]. Available: http://www.jimga.or.jp/front/bin/cglist.phtml?Category=6943. [Accessed 2 February 2017]. [184] Cornell University Law School, "Maximum Allowable Working Pressure," [Online]. Available: https://www.law.cornell.edu/cfr/text/46/54.10-5. [Accessed 2 February 2017]. [185] Washington State Department of Labor & Industries, "Management of Change," [Online]. Available: http://www.lni.wa.gov/safety/grantspartnerships/partnerships/vpp/pdfs/vppmocbestpractices.pdf. [Accessed 2 February 2017].

CSB • Investigation Report • Airgas • Cantonment, Florida 143 [186] National Fire Protection Association (NFPA), "NFPA Web Site," [Online]. Available: http://www.nfpa.org/. [Accessed 2 February 2017]. [187] Pumpschool.com, "Understanding Net Positive Suction Head," 2007. [Online]. Available: http://www.pumpschool.com/applications/npsh.pdf. [Accessed 2 February 2017]. [188] USNTSB, "NTSB Web Site," [Online]. Available: http://www.ntsb.gov. [Accessed 2 February 2017]. [189] Valve Magazine, "Introduction to Pressure Relief Devices - Part 1," [Online]. Available: http://www.valvemagazine.com/magazine/sections/back-to-basics/7322-pressure-relief-devices-part-1.html. [Accessed 2 February 2017]. [190] USDOL, "Process Safety Management of Highly Hazardous Chemicals," 8 February 2013. [Online]. Available: https://www.osha.gov/pls/oshaweb/owadisp.show_document?p_table=STANDARDS&p_id=9760. [Accessed 2 February 2017]. [191] USDOL, "Process Safety Management," 2000. [Online]. Available: https://www.osha.gov/Publications/osha3132.html. [Accessed 2 February 2017]. [192] C. McLaren, "Safety Management Systems Update," 26 August 2016. [Online]. Available: http://www.texasgas.com/wp-content/uploads/2016/08/Safety-Management-Systems_TGA- TRRC_08.26.2016-PHMSA-Chris-McLaren.pdf. [Accessed 2 February 2017]. [193] Chemours, "Teflon PTFE Coating, Extrusion and Molding," 2017. [Online]. Available: https://www.chemours.com/Teflon_Industrial/en_US/products/product_by_name/teflon_ptfe/. [Accessed 2 February 2017]. [194] USDOL, "Background on Recognized and Generally Accepted Good Engineering Practice," 11 May 2016. [Online]. Available: https://www.osha.gov/pls/oshaweb/owadisp.show_document?p_table=INTERPRETATIONS&p_id=30785 . [Accessed 2 February 2017]. [195] USEPA, "Risk Management Plan (RMP) Rule," 21 December 2016. [Online]. Available: https://www.epa.gov/rmp. [Accessed 2 February 2017]. [196] USDOL, "Hazard Communication Safety Data Sheets," [Online]. Available: https://www.osha.gov/Publications/HazComm_QuickCard_SafetyData.html. [Accessed 2 February 2017]. [197] Instrument and Control Engineering for Process Industries, "Safety Instrumented System (SIS)," [Online]. Available: http://instrumentationportal.com/2011/instrument-glossary/glossary-s/safety-instrumented- system-sis/. [Accessed 2 February 2017]. [198] FAA, "Safety Management System (SMS)," 5 July 2016. [Online]. Available: https://www.faa.gov/about/initiatives/sms/. [Accessed 2 February 2017]. [199] Electrical Engineering Portal (EEP), "7 Most Common Motor Enclosure Types Defined by NEMA Standards," 9 August 2013. [Online]. Available: http://electrical-engineering-portal.com/7-most-common- motor-enclosure-types-defined-by-nema-standards. [Accessed 2 February 2017]. [200] USA.gov, "About the United States," [Online]. Available: https://www.usa.gov/about-the-us. [Accessed 2 February 2017].

CSB • Investigation Report • Airgas • Cantonment, Florida 144

[201] Centers for Disease Control and Prevention (CDC), "The National Institute for Occupational Safety and Health (NIOSH)," 30 January 2017. [Online]. Available: https://www.cdc.gov/niosh/index.htm. [Accessed 2 February 2017]. [202] Bakersfield.com, "Three Injured in Mojave Explosion Recovering," 1 August 2007. [Online]. Available: http://www.bakersfield.com/news/three-injured-in-mojave-explosion-recovering/article_24a39a28-c51f- 5d3a-8444-25b550590d86.html. [203] Beaver County Times, "Powerful Explosion Hits Plant," November 6, 1980. [Online]. Available: https://news.google.com/newspapers?nid=2002&dat=19801106&id=dFkuAAAAIBAJ&sjid=1dkFAAAAI BAJ&pg=1387,1217420. [Accessed 21 January 2017]. [204] D. Long and T. Heidermann, "Flame Arresters for Plants Handling Acetylene and Ethylene Oxide," in IChemE: Hazards XXI: Symposium Series No. 155, 2009. [205] National Fire Protection Association, "Guide for Fire & Explosion Investigations," 2014. [Online]. Available: http://www.nfpa.org/codes-and-standards/all-codes-and-standards/list-of-codes-and- standards?mode=code&code=921. [Accessed 2 February 2017]. [206] National Institute of Standards and Technology (NIST), "Nitrogen Dioxide," 2016. [Online]. Available: http://webbook.nist.gov/cgi/cbook.cgi?ID=C10102440&Units=SI. [Accessed 2 February 2017]. [207] National Institute of Standards and Technology (NIST), "Nitric Oxide," 2016. [Online]. Available: http://webbook.nist.gov/cgi/cbook.cgi?ID=C10102439&Units=SI. [Accessed 2 February 2017]. [208] National Institute of Standards and Technology (NIST), "Nitrous Oxide," 2016. [Online]. Available: http://webbook.nist.gov/cgi/cbook.cgi?Name=nitrous+oxide&Units=SI. [Accessed 2 February 2017]. [209] National Institute of Standards and Technology, "Tetrafluoroethylene," 2016. [Online]. Available: http://webbook.nist.gov/cgi/cbook.cgi?Name=Tetrafluoroethene&Units=SI. [Accessed 2 February 2017]. [210] Internal Revenue Service (IRS), "Limited Liability Company (LLC)," 8 July 2016. [Online]. Available: https://www.irs.gov/businesses/small-businesses-self-employed/limited-liability-company-llc. [Accessed 2 February 2017]. [211] International Society for Pharmaceutical Engineering (ISPE), "Good Manufacturing Practice (GMP) Resources," 2017. [Online]. Available: http://www.ispe.org/gmp-resources. [Accessed 2 February 2017]. [212] Canadian Centre for Occupational Health and Safety (CCOHS), "How do I Work Safely With - Flammable and Combustible Liquids (Static Electricity)," 30 September 2008. [Online]. Available: https://www.ccohs.ca/oshanswers/prevention/flammable_static.html. [Accessed 25 January 2017]. [213] American Society for Quality (ASQ), "Learn About Quality: Failure Mode Effects Analysis (FMEA),"

  1. [Online]. Available: http://asq.org/learn-about-quality/process-analysis-tools/overview/fmea.html.

[Accessed 2 February 2017]. [214] Air Liquide, "Air Liquide Completes Acquisition of Airgas," 23 May 2016. [Online]. Available: https://www.airliquide.com/media/air-liquide-completes-acquisition-airgas. [Accessed 21 January 2017].

CSB • Investigation Report • Airgas • Cantonment, Florida 145 [215] AIGA, "Safe Practices for Storage and Handling of Nitrous Oxide," [Online]. Available: http://www.asiaiga.org/uploaded_docs/AIGA%20055_14%20Installation%20guide%20for%20stationary% 20electric%20motor%20driven%20centrifugal%20liquid%20oxygen%20pumps.pdf. [Accessed 21 January 2017]. [216] AmeriGas, "AmeriGas Web Site," 2017. [Online]. Available: https://www.amerigas.com/. [Accessed 4 February 2017]. [217] Association of Oil Pipe Lines (AOPL) and American Petroleum Institute (API), "Safety Management Systems," December 2012. [Online]. Available: http://www.phmsa.dot.gov/staticfiles/PHMSA/DownloadableFiles/Files/Pipeline/2%20SafetyMgt_PAC_R GM.ppt. [Accessed 5 February 2017]. [218] American Petroleum Institute (API), "Pressure-Relieving and Depressuring Systems: API Standard 521," January 2014. [219] American Petroleum Institute (API), "ANSI/API Recommended Practice 1173: Pipeline Safety Management Systems," 2015. [220] International Society of Automation (ISA), "Products Landing: ISA-84," [Online]. Available: https://www.isa.org/store/products/?mstype=Publications&ms_product_type=Standards&mssearch=ISA- 84#/2b74cfb1cb8ac00c1f7844ab64d0518e. [Accessed 14 February 2017]. [221] USDOL, "Accident Report Detail: Accident: 201089349 - Three Employees Killed Three Injured In Explosion," 26 July 2007. [Online]. Available: https://www.osha.gov/pls/imis/accidentsearch.accident_detail?id=201089349. [Accessed 18 February 2017]. [222] USDOL, "Fatality and Catastrophe Investigation Summaries," [Online]. Available: https://www.osha.gov/pls/imis/accidentsearch.html. [Accessed 18 February 2017]. [223] U.S. Department of Health and Human Services, Food and Drug Administration, Center for Drug Evaluation and Research (CDER), Center for Biologics Evaluation and Research (CBER), Center for Veterinary Medicine (CVM), "Guidance for Industry: Process Validation: General Principles and Practices," January 2011. [Online]. Available: https://www.fda.gov/downloads/drugs/guidances/ucm070336.pdf. [Accessed 18 February 2017]. [224] FTC, "Appendix A: Gases Locations," [Online]. Available: https://www.ftc.gov/system/files/documents/cases/160513americanair-appendixa_0.pdf. [Accessed 21 January 2017]. [225] Emerson, "See How a Flame Arrestor Works," [Online]. Available: http://www2.emersonprocess.com/en- US/divisions/regulator- technologies/Documents/animations/TypeArrestor_EN.swf?_ga=1.47987495.1093675283.1474291775. [Accessed 22 January 2017]. [226] W. Schmidt, "Burning Steel Wool: Comparing Four Grades of Steel Wool to see Which Burns the Best,"

  1. [Online]. Available: https://www.youtube.com/watch?v=xVd9vWhSzN0. [Accessed 22 January

2017].

CSB • Investigation Report • Airgas • Cantonment, Florida 146

[227] "Graphic of Close-Coupled Pump," [Online]. Available: http://img.weiku.com/a/017/155/EAZ_Close_Coupled_In_line_Centrifugal_Water_Pump_6137_1.jpg. [Accessed 22 January 2017]. [228] "CSB Safety Video: Reactive Hazards: Dangers of Uncontrolled Chemical Reactions," Sandy Gilmour Communications LLC., July 2007. [Online]. Available: https://www.youtube.com/watch?v=sRuz9bzBrtY. [Accessed 21 January 2017]. [229] USCSB, "Final Investigation Report: Chevron Richmond Refinery: Pipe Rupture and Fire: Chevron Richmond Refinery #4 Crude Unit: Richmond, California: August 6, 2012: 2012-03-I-CA," 2015. [Online]. Available: http://www.csb.gov/assets/1/19/Chevron_Final_Investigation_Report_2015-01-28.pdf. [Accessed 19 February 2017]. [230] USCSB, "Hazard Investigation: Improving Reactive Hazard Management: 2001-01-H," 2002. [Online]. Available: http://www.csb.gov/assets/1/19/ReactiveHazardInvestigationReport.pdf. [Accessed 22 January 2017]. [231] USCSB, "Investigation Report: Catastrophic Rupture of Heat Exchanger (Seven Fatalities): Tesoro Anacortes Refinery: Anacortes, Washington: April 2, 2010: 2010-08-I-WA," 2014. [Online]. Available: http://www.csb.gov/assets/1/7/Tesoro_Anacortes_2014-May-01.pdf. [Accessed 19 February 2017]. [232] USCSB, "Investigation Report: Volume 4: Drilling Rig Explosion and Fire at the Macondo Well," 2016. [Online]. Available: www.csb.gov/file.aspx?DocumentId=742. [Accessed 22 January 2017]. [233] USCSB, "Key Lessons for Preventing Incidents from Flammable Chemicals in Educational Demonstrations: Eliminating Flash Fire Hazards by Substituting or Minimizing the use of Flammable Chemicals and Performing an Effective hazard Review Will Prevent Injuries," 2014. [Online]. Available: http://www.csb.gov/key-lessons-for-preventing-incidents-from-flammable-chemicals-in-educational- demonstrations/. [Accessed 19 February 2017]. [234] USCSB, "Recommendations: Improving Reactive Hazard Management," [Online]. Available: http://www.csb.gov/recommendations/?F_InvestigationId=78. [Accessed 19 February 2017]. [235] USCSB, "Tesoro Martinez Refinery: Process Safety Culture Case Study: Martinez, California: February 12, 2014 and March 10, 2014 Sulfuric Acid Release Incidents," 2016. [Online]. Available: http://www.csb.gov/assets/1/19/Tesoro_Martinez_Final_Case_Study1.pdf. [Accessed 19 February 2017]. [236] USCSB, "Williams Geismar Olefins Plant: Reboiler Rupture and Fire: Geismar, Louisiana," 2013. [Online]. Available: http://www.csb.gov/assets/1/7/Williams_Case_Study_2016-10-19.pdf. [Accessed 19 February 2017]. [237] BTC Instrumentation, "Cavitation in a Water Pump," 30 November 2012. [Online]. Available: https://www.youtube.com/watch?v=eMDAw0TXvUo. [Accessed 22 January 2017]. [238] FM Global, "Property Loss Prevention Data Sheets: Explosion Protection Systems: 7-17," 2012. [Online]. Available: fmglobal.com. [Accessed 19 February 2017]. [239] British Standard, "Flame Arresters - Performance Requirements, Test Methods and Limits for Use," 2001.

FD06485 | 2016_美国_CSB_enterprise-pascagoula-gas-plant-explosion-and-fire.pdf

分类:06_境外及港澳台调查报告 | 年份:2016 | 地域: | 严重程度: | 场所: | 起火原因: | 来源格式:pdf

Page 1 Loss of Containment, Fires, and Explosions at Enterprise Products Midstream Gas Plant

Pascagoula, Mississippi | Incident Date: June 27, 2016 | No. 2016-02-I-MS KEY ISSUES: • Exchanger Failure Due to Thermal Fatigue • Service Life Determination of Brazed Aluminum Heat Exchangers • Social Media Use in Emergency Response Case Study Published: February 13, 2019 Photos Credit: CSB

Page 2 Loss of Containment, Fires, and Explosions at Enterprise Products Midstream Gas Plant

Pascagoula, Mississippi | Incident Date: June 27, 2016 | No. 2016-02-I-MS The U.S. Chemical Safety and Hazard Investigation Board (CSB) is an independent federal agency whose mission is to drive chemical safety change through independent investigations to protect people and the environment. The CSB is a scientific investigative organization, not an enforcement or regulatory body. Established by the Clean Air Act Amendments of 1990, the CSB is responsible for determining accident causes, issuing safety recommendations, studying chemical safety issues, and evaluating the effectiveness of other government agencies involved in chemical safety. More information about the CSB is available at www.csb.gov. The CSB makes public its actions and decisions through investigative publications, all of which may include safety recommendations when appropriate. Types of publications include: Investigation Reports: Formal, detailed reports on significant chemical incidents that include key findings, root causes, and safety recommendations. Investigation Digests: Plain-language summaries of Investigation Reports. Case Studies: Reports that examine fewer issues than Investigation Reports. Safety Bulletins: Short publications typically focused on a single safety topic. Hazard Investigations: Broader studies of significant chemical hazards. Safety Videos: Videos that animate aspects of an incident or amplify CSB safety messages. CSB products can be freely accessed at www.csb.gov or obtained by contacting: U.S. Chemical Safety and Hazard Investigation Board Office of Congressional, Public, and Board Affairs 1750 Pennsylvania Ave., NW, Suite 910 Washington, DC 20006 (202) 261-7600 No part of the conclusions, findings, or recommendations of the Board relating to any accidental release or the investigation thereof shall be admitted as evidence or used in any action or suit for damages arising out of any matter mentioned in such report. See 42 U.S.C. § 7412(r)(6)(G).

Page 3 Loss of Containment, Fires, and Explosions at Enterprise Products Midstream Gas Plant

Pascagoula, Mississippi | Incident Date: June 27, 2016 | No. 2016-02-I-MS Table of Contents Figures ....................................................................................................................................................................................5 Tables ....................................................................................................................................................................................9 Acronyms and Abbreviations...............................................................................................................................................10 1.0 Executive Summary.........................................................................................................................................................11 2.0 Background ....................................................................................................................................................................12

  1. 1 Incident Synopsis.......................................................................................................................................................................12
  1. 2 Brazed Aluminum Heat Exchangers .........................................................................................................................................14
  1. 3 Introduction to Thermal Fatigue in a BAHX..............................................................................................................................15
  2. 0 The Incident.................................................................................................................................................................... 17
  1. 1 OSHA Activities at PGP.............................................................................................................................................................20
  2. 0 Initiating Event and Likely Failure Scenario...................................................................................................................21
  1. 1 Initial Failure Point and Likely Damage Mechanism.................................................................................................................21
  1. 2 Configuration of the BAHX of Interest..................................................................................................................................... 23
  1. 3 Most Likely Failure Scenario ................................................................................................................................................... 23
  1. 4 Thermal Fatigue Events Elsewhere............................................................................................................................................27
  2. 0 Thermal Fatigue in BAHXs at the Pascagoula Gas Plant...............................................................................................29
  1. 1 Recognized and Generally Accepted Good Engineering Practices.........................................................................................30
  1. 2 Recommended BAHX Heating and Cooling Rates....................................................................................................................31
  1. 3 PGP’s Thermal-Fatiguing Process Conditions ........................................................................................................................ 33
  1. 3.1 Upstream Influences and Downstream Orders to Curtail or Stop Production..................................................................................33
  1. 3.2 Compressor Shutdowns .....................................................................................................................................................................33
  1. 3.3 Erratic Flow..........................................................................................................................................................................................33
  1. 4 Industry Thermal Fatigue Monitoring Guidance...................................................................................................................... 35
  1. 5 Operating Conditions Can Gradually Manifest into Thermal Fatigue Failures........................................................................ 36
  1. 6 Temperature Sensor Location...................................................................................................................................................37
  1. 7 Lack of Industry Data Sharing.................................................................................................................................................. 38

Page 4 Loss of Containment, Fires, and Explosions at Enterprise Products Midstream Gas Plant

Pascagoula, Mississippi | Incident Date: June 27, 2016 | No. 2016-02-I-MS 6.0 Process Safety Management at PGP............................................................................................................................ 40

  1. 1 Hazard Assessment and Evolving Perception of Thermal Fatigue Risk at PGP......................................................................40
  1. 2 Mechanical Integrity at PGP..................................................................................................................................................... 42
  1. 2.1 Leak and Repair History of the ACSR.................................................................................................................................................43
  1. 2.2 2015 ACSR Repair ..............................................................................................................................................................................43
  1. 2.3 Recommended Thermal Fatigue Inspection Practices......................................................................................................................45
  1. 2.4 PGP Inspection Practices for BAHXs.................................................................................................................................................46
  1. 3 Enterprise BAHX Integrity Management at Other Facilities.................................................................................................... 46
  1. 3.1 Enterprise BAHX Mechanical Integrity Initiative................................................................................................................................ 47
  1. 4 Hierarchy of Controls and Risk Assessment........................................................................................................................... 48
  2. 0 Emergency Response, Community Notification, and the Use of Social Media.............................................................49
  1. 1 Emergency Plan and Response................................................................................................................................................. 49
  1. 2 Community Notification during the Incident.............................................................................................................................51
  1. 3 Options and Opportunities for Community Notification...........................................................................................................51
  2. 0 Recommendations..........................................................................................................................................................55

American Petroleum Institute (API)............................................................................................................................................... 55

2016-02-I-MS-R1 .........................................................................................................................................................................................55

GPA Midstream Association .......................................................................................................................................................... 55

2016-02-I-MS-R2 .........................................................................................................................................................................................55

2016-02-I-MS-R3..........................................................................................................................................................................................55

2016-02-I-MS-R4..........................................................................................................................................................................................55

Jackson County Local Emergency Planning Committee............................................................................................................... 55

2016-02-I-MS-R5..........................................................................................................................................................................................55 Appendix A: Visual Representation of CSB Investigation Findings and Causal Factors of the June 27, 2016, Event......................................................................................................................56 Appendix B: Process Overview.............................................................................................................................................57 Appendix C: Initial Failure Point and Progression of Equipment Failures.......................................................................... 60 Appendix D: Post-incident Metallurgical Examination........................................................................................................63 Appendix E: Pressure Changes Resulting from Thermal Expansion During Curtailment..................................................63 Appendix F: Alternative Failure Scenarios ..........................................................................................................................63 Members of the U.S. Chemical Safety and Hazard Investigation Board............................................................................ 69

Page 5 Loss of Containment, Fires, and Explosions at Enterprise Products Midstream Gas Plant

Pascagoula, Mississippi | Incident Date: June 27, 2016 | No. 2016-02-I-MS Figures Figure 1. Drone image of the facility depicting fire damage incurred at the plant.........................................................................................12 Figure 2. A comparison of the B-Train (top, shown in mirror image to match A-Train)

and A-Train (bottom) process areas after the night of the incident..................................................................................................13 Figure 3. An exchanger core comprises many layers, consisting of a set of corrugated fins joined between two thin

aluminum parting sheets. The outermost parting sheets are called cap sheets and are discussed further in the text.

The edges are sealed with side bars. BAHX length, width, and height are based on the position of the exchanger

during its manufacture........................................................................................................................................................................14 Figure 4. Process streams are distributed through alternating layers, where the warmer stream (red) transfers heat

to the cooler stream (blue) across the parting sheet, which acts as a barrier between the streams.

The fin matrix also aids in heat transfer.............................................................................................................................................14 Figure 5. Diagram depicting a view looking down the length of a BAHX core. Pressure from the process fluids applies

a force to the fins of the BAHX. The fin arrangement behaves like a bridge truss, distributing the force across

the width of the pass...........................................................................................................................................................................15 Figure 6. One area of high thermal stress in a BAHX is at the side bar/attachment plate/cap sheet junction.

The thicker pieces of aluminum—the side bar and attachment plate (red)—change temperature at a slower

rate than the thinner cap sheet (blue). Adding and removing thermal stresses where these pieces join (yellow)

can eventually cause thermal fatigue cracks to form.......................................................................................................................15 Figure 7. Simplified process overview for PGP. The first liquid product stream is trucked off site and the second is

sent through the Tri-States pipeline. PGP sends the gas product stream through the Destin pipeline.

A full process description and details on equipment depicted in the figure is in Appendix B.......................................................17 Figure 8. Field of view (yellow) for the operators from their vantage point, located just outside the control room

and just inside the access control fencing, from which they assessed the magnitude of the incident (circle)............................18 Figure 9. Photograph taken at the intersection of Stennis Boulevard and Old Mobile Avenue, a major thoroughfare

running adjacent to the PGP property line. (Credit: Pascagoula Fire Department)........................................................................19 Figure 10. Water monitor being set up by emergency responders to cool equipment. (Credit: Pascagoula Fire Department)....................19 Figure 11. Simplified timeline of events on June 27–28, 2016.......................................................................................................................... 20 Figure 12. Diagram (left) and post-incident photograph of the ACSR (right). The red box highlights the location of the

initial failure, where the partial loss of the north cap sheet along with portions of several layers occurred................................21 Figure 13. Diagram (left) and post-incident photograph of the ACSR (right) identifying two breaches. The red circle highlights

the breach of the header. The red box shows a breach on piping connected to the header. Results of a visual

field examination ruled out the latter breach as the initial failure location.....................................................................................21 Figure 14. Side view of the ACSR.........................................................................................................................................................................23

Page 6 Loss of Containment, Fires, and Explosions at Enterprise Products Midstream Gas Plant

Pascagoula, Mississippi | Incident Date: June 27, 2016 | No. 2016-02-I-MS Figure 15. Interpass leaks were detected by pressurizing the B pass layers (blue) of the exchanger and

monitoring for leak indicators in the A layers. Leaks into layers 2 and 98 were detected (blue arrows),

possibly coming from either layer 1 or layer 3 and either layer 97 or layer 99, respectively. The leaks

could also have come from adjacent layers......................................................................................................................................23 Figure 16. Example of vent holes (white circle) drilled into a BAHX that was in the process of having passes

blocked off (red arrow). This image does not depict any exchangers on PGP property. (Credit: Willard,

Field Repair of Brazed Aluminum Plate-Fin Heat Exchangers, p 7).................................................................................................24 Figure 17. Metallurgical examination revealed a crack in the parting sheet between layer 97 and layer 98.

The crack did not extend the full thickness of the parting sheet, but it is an indication that thermal fatigue

existed in the parting sheet. Through-wall cracks may have existed in other areas of the parting sheet that

were not examined or were destroyed by the ensuing fires..............................................................................................................24 Figure 18. To repair the leaks into layers 2 and 98, workers welded closed layers 99 and 98 as well as layers 1 and 2.

Repair documentation states that after welding the four passes closed, workers planned to pressurize the

blocked A pass layer 98 (blue) and monitor for leaks into B pass layer 97 (arrows). No records show that

workers completed this test to confirm that interpass cracks did not exist between layers 98 and 97....................................... 25 Figure 19. Depiction of the ACSR (left) and two post-incident photos. A portion of the bottom attachment plate and north

cap sheet that was found on the ground near the exchanger post-incident (bottom right) shows far less fire

damage than the top attachment plate (top right), suggesting that it was not exposed to the effects of the fire

as directly as other portions of the exchanger, implying that it fell from the exchanger early during the event......................... 25 Figure 20. Two post-incident images depicting the remaining north cap sheet attached to the ACSR core.

The bottom edge of the cap sheet that remains curls away from the core.................................................................................... 26 Figure 21. Bulge observed in the ACSR that affected layers 95 through 99 (left). The bulge is on the northeast bottom

corner of the exchanger in the area of the missing cap sheet and attachment plate (red box, right).

Also shown in the image on the right is the place where the cap sheet is missing from the exchanger...................................... 26 Figure 22. Image of the blocked vent holes. The CSB observed welds on the outside of the exchanger (top).

Cross-section of the drilled holes (bottom).......................................................................................................................................27 Figure 23. A ruptured BAHX from a ConocoPhillips gas plant in 2015. The red box shows the similarities between the

separation of the cap sheet in this incident and the failure scenario described in Section 4.3. (Credit: Chart Industries)........27 Figure 24. Ruptured cold side reboiler at Enterprise’s Chaco gas plant, showing the exchanger still covered

in insulation. (Credit: Chart Industries)............................................................................................................................................. 28 Figure 25. Timeline of hydrocarbon leaks to atmosphere from four BAHXs at PGP........................................................................................ 29 Figure 26. ACSR process stream temperature ROC data for B pass outlet (red) and B pass differential pressure

data (yellow). The black dot-dashed lines indicate the maximum temperature ROC for steady-state operations,

as recommended by industry guidance of ALPEMA, Chart, and GPA Midstream. The blue dashed lines indicate

API guidance for temperature ROC................................................................................................................................................... 34

Page 7 Loss of Containment, Fires, and Explosions at Enterprise Products Midstream Gas Plant

Pascagoula, Mississippi | Incident Date: June 27, 2016 | No. 2016-02-I-MS Figure 27. Total minutes per year that the inlet and outlet stream temperatures of the ACSR were greater than

the industry-recommended ROC guidelines of 1.8°F/min. Red dots indicate years when cracks that

resulted in leaks which were repaired................................................................................................................................................37 Figure 28. ROC in temperature categorized into five temperature ranges, split between two graphs, to illustrate

the magnitude of stream temperature changes for the ACSR over its life-span. The bottom graph shows the

bins with an ROC greater than 12.6°F/min. Note that there the scale for the Y axis on each graph is different...........................37 Figure 29. ROC data from January 1, 2011, to June 27, 2016, normalized to the A-Train run time for the inlet, outlet,

and metal temperatures of the ACSR. ROCs calculated from the metal temperatures are about 10 times

less than those for the stre